Sample records for replacement projects cxs

  1. Grand Coulee Transmission Line Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    by the Bureau of Reclamation to design and construct six new 500-kV overhead transmission lines at Grand Coulee Dam. BPA will replace the existing underground transmission...

  2. Project Title: X-Ray Machine Replacement Project (4552)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70 Hg MercuryProjectExclusionUeterminatton 1"orn1

  3. Federal Aviation Administration National Engine Generator Replacement Project

    SciTech Connect (OSTI)

    Sturm, C.C.

    1995-12-31T23:59:59.000Z

    The Federal Aviation Administration (FAA) is undertaking a major project to replace aging engine generators over the next few years. The engine generators currently installed at various National Airspace System (NAS) facilities such as airport traffic control towers and radars provide standby power critical to the safe operation of air traffic in the NAS. This paper will describe the FAA engine generator set (EGS) replacement decision process, procurement options, technical requirements and installation criteria to replace up to 3,000 existing EGS`s and establish additional EGS`s for new equipment installations. Each EGS includes an engine, alternator, automatic transfer switch, load bank, environmentally safe day tank and battery charger. Buying commercial-off-the-shelf (COTS) EGS equipment instead of using a development procurement with a detailed technical specification, provides an opportunity to do business in a new way for the FAA and a vehicle to procure EGS`s with proven quality and performance. Logistics support (parts support) will be provided by the COTS EGS supplier at a fixed cost over the five year contract life. Pre-award EGS benchmark testing gave the FAA an opportunity to closely look at EGS`s recently manufactured and configured to simulate an actual FAA installation.

  4. EA-0923: Winnett School District Boiler Replacement Project, Winnett, Montana

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal to replace the Winnett School District complex's existing oil-fired heating system with a new coal-fired heating system with funds...

  5. Milling Machine Replacement Project (4587), 5/11/2012

    Broader source: Energy.gov (indexed) [DOE]

    by E-mail The proposed action is to replace two large milling machines with two new medium sized CNC milling machines. The new machines will be connected to the digital...

  6. Developing a total replacement cost index for suburban office projects

    E-Print Network [OSTI]

    Hansen, David John, S.M. Massachusetts Institute of Technology

    2006-01-01T23:59:59.000Z

    Understanding the components of replacement costs for office developments, and how these components combine to create total development costs is essential for success in office real estate development. Surprisingly, the ...

  7. Programmatic mission capabilities - chemistry and metallurgy research replacement (CMRR) project

    SciTech Connect (OSTI)

    Gunderson, L Nguyen [Los Alamos National Laboratory; Kornreich, Drew E [Los Alamos National Laboratory; Wong, Amy S [Los Alamos National Laboratory

    2011-01-04T23:59:59.000Z

    CMRR will have analysis capabilities that support all the nuclear-material programs and national security needs. CMRR will replace the aging CMR Building and provide a key component responsive infrastructure necessary to sustain all nuclear programs and the nuclear-weapons complex. Material characterization capabilities - evaluate the microstructures and properties of nuclear materials and provide experimental data to validate process and performance models. Analytical chemistry capabilities - provide expertise in chemical and radiochemical analysis of materials where actinide elements make up a significant portion of the sample.

  8. Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 - 72" Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal 

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

    2002-01-01T23:59:59.000Z

    ). Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for both components of the proposed project (i.e., 72" pipeline replacing a segment of delivery canal along...

  9. Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 - 72" Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

    TR-205 November 2002 Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 – 72" Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal M. Edward Rister... Ronald D. Lacewell Allen W. Sturdivant John R. C. Robinson Michael C. Popp John R. Ellis Texas Water Resources Institute Texas A&M University TR-205 November 2002 Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg...

  10. EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement Project, Malheur County, Oregon

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management, with the Bonneville Power Administration (BPA) as a cooperating agency, prepared an EA that assesses the potential environmental impacts of the proposed authorization of a right of way to the Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA’s proposed action was to fund the project

  11. Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects

    SciTech Connect (OSTI)

    Richman, Eric E.

    2009-11-04T23:59:59.000Z

    This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

  12. Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-06-01T23:59:59.000Z

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  13. Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-06-01T23:59:59.000Z

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  14. Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-06-01T23:59:59.000Z

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  15. LED Lamp Project Lights the Way to Flicker-Free Replacement Jade Sky Technologies and UC Davis's California Lighting Technology Center demonstrate the

    E-Print Network [OSTI]

    California at Davis, University of

    LED Lamp Project Lights the Way to Flicker-Free Replacement Jade Sky the flicker and dimming requirements set by the Voluntary California Quality LED Lamp for incentivized LED replacement lamps. These criteria go beyond energy efficiency

  16. Department of Industrial Engineering Spring 2010 ArcelorMittal's Taphole Replacement Project

    E-Print Network [OSTI]

    Demirel, Melik C.

    PENNSTATE Department of Industrial Engineering Spring 2010 ArcelorMittal's Taphole Replacement the current taphole replacement problem Use advanced decision-making tools to select an optimal concept to be manufactured An SOP was created that standardized the taphole replacement process and reduced overall

  17. Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 54" Pipeline Replacing Main Canal – Preliminary 

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    2003-01-01T23:59:59.000Z

    ) and Bureau of Reclamation (BOR). The proposed project involves constructing a 72" and 54" pipeline to replace 2.29 miles of the “Main Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

  18. Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 48" Pipeline Replacing Main Canal – Final 

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    2003-01-01T23:59:59.000Z

    ) and Bureau of Reclamation (BOR). The proposed project involves constructing a 72" and 48" pipeline to replace 2.31 miles of the “Main Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

  19. Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 54" Pipeline Replacing Main Canal – Preliminary

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    ) and Bureau of Reclamation (BOR). The proposed project involves constructing a 72" and 54" pipeline to replace 2.29 miles of the “Main Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

  20. Rohm and Haas: Furnace Replacement Project Saves Energy and Improves Production at a Chemical Plant

    SciTech Connect (OSTI)

    Not Available

    2006-02-01T23:59:59.000Z

    This DOE Industrial Technologies Program spotlight describes how Rohm and Haas's Deer Park, Texas, chemical plant reduced natural gas usage and energy costs by replacing inefficient furnace equipment.

  1. Waste minimization plan construction and operation of the replacement cross-site transfer system, project W-058

    SciTech Connect (OSTI)

    Boucher, T.D.

    1996-04-01T23:59:59.000Z

    This report addresses the research and development of a waste minimization plan for the construction and operation of Project W-058, Replacement of the Cross-Site Transfer System, on the Hanford Site. The plan is based on Washington Administrative Code (WAC) 173-307, Plans. The waste minimization plan identifies areas where pollution prevention/waste minimization principles can be incorporated into the construction and operation of the cross-site transfer system.

  2. Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) - 48" Pipeline Replacing Wisconsin Canal - Final 

    E-Print Network [OSTI]

    Rister, Edward; Lacewell, Ronald; Sturdivant, Allen; Robinson, John; Popp, Michael

    2003-01-01T23:59:59.000Z

    Development Bank (NADBank) and Bureau of Reclamation. The proposed project involves constructing a 48" pipeline to replace the “Wisconsin Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

  3. Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) – 48" Pipeline Replacing Wisconsin Canal – Preliminary 

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    2003-01-01T23:59:59.000Z

    Development Bank (NADBank) and Bureau of Reclamation. The proposed project involves constructing a 48" pipeline to replace the “Wisconsin Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

  4. Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) - 48" Pipeline Replacing Wisconsin Canal - Final

    E-Print Network [OSTI]

    Rister, Edward; Lacewell, Ronald; Sturdivant, Allen; Robinson, John; Popp, Michael

    Development Bank (NADBank) and Bureau of Reclamation. The proposed project involves constructing a 48" pipeline to replace the “Wisconsin Canal.” Both nominal and real estimates of water and energy savings and expected economic and financial costs of those...

  5. Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

    SciTech Connect (OSTI)

    Stephens, Jessica D.

    2013-05-29T23:59:59.000Z

    On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently had an IMD installed. This further study of facilities revealed that the implementation of the project as originally described, while proving the benefits described in the original grant application, would likely intensify sand intake. Increased sand intake would lead to an increase in required shutdowns for maintenance and more rapid depreciation of key equipment which would result in a loss of generation capacity. A better solution to the problem, one that continued to meet the criteria for the original grant and ARRA standards, was developed. A supporting day trip was planned to visit other facilities located on the Arkansas River to determine how they were coping with the same strong amounts of sand, silt, and debris. Upon returning from the trip to other Arkansas River facilities it was extremely clear what direction to go in order to most efficiently address the issue of generator capacity and efficiency. Of the plants visited on the Arkansas River, every one of them was running what is called a rope packing shaft sealing system as opposed to mechanical shaft seals, which the facility was running. Rope packing is a time proven sealing method that has been around for centuries. It has proved to perform very well in dirty water situations just like that of the Arkansas River. In April of 2012 a scope change proposal was submitted to the DOE for approval. In August of 2012 the City received word that the change of scope had been approved. Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

  6. Design Tools to Assess Hydro-Turbine Biological Performance: Priest Rapids Dam Turbine Replacement Project

    SciTech Connect (OSTI)

    Richmond, Marshall C.; Rakowski, Cynthia L.; Serkowski, John A.; Strickler, Brad; Weisbeck, Molly; Dotson, Curtis L.

    2013-06-25T23:59:59.000Z

    Over the past two decades, there have been many studies describing injury mechanisms associated with turbine passage, the response of various fish species to these mechanisms, and the probability of survival through dams. Although developing tools to design turbines that improve passage survival has been difficult and slow, a more robust quantification of the turbine environment has emerged through integrating physical model data, fish survival data, and computational fluid dynamics (CFD) studies. Grant County Public Utility District (GCPUD) operates the Priest Rapids Dam (PRD), a hydroelectric facility on the Columbia River in Washington State. The dam contains 10 Kaplan-type turbine units that are now almost 50 years old. The Utility District plans to refit all of these aging turbines with new turbines. The Columbia River at PRD is a migratory pathway for several species of juvenile and adult salmonids, so passage of fish through the dam is a major consideration when replacing the turbines. In this presentation, a method for turbine biological performance assessment (BioPA) is introduced. Using this method, a suite of biological performance indicators is computed based on simulated data from a CFD model of a proposed turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. Using known relationships between the dose of an injury mechanism and frequency of injury (dose–response) from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from proposed designs, the engineer can identify the more-promising alternatives. We will present application of the BioPA method for baseline risk assessment calculations for the existing Kaplan turbines at PRD that will be used as the minimum biological performance that a proposed new design must achieve.

  7. Project Plan 7930 Cell G PaR Remote Handling System Replacement

    SciTech Connect (OSTI)

    Kinney, Kathryn A [ORNL

    2009-10-01T23:59:59.000Z

    For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ({sup 252}Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for {sup 252}Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for {sup 252}Cf processing in Building 7930, Cell G require use of through-the-wall manipulators and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully functioning and reliable Par manipulator arm is necessary for uninterrupted {sup 252}Cf operations; a fully-functioning bridge is needed for the system to function as intended.

  8. Jade Sky Technologies Partners with CLTC on LED Replacement Lamp Upgrade Project UC Davis' California Lighting Technology Center will utilize Jade Sky Technologies' driver ICs to help spur

    E-Print Network [OSTI]

    California at Davis, University of

    Jade Sky Technologies Partners with CLTC on LED Replacement Lamp Upgrade Project UC Davis and power factor. "JST shares our goal of making the transition to LED lamps a satisfying experience of cost-effective, easy-to-use LED lighting solutions Milpitas, Calif. ­ October 15, 2013 ­ Jade Sky

  9. High Level Waste Tank Farm Replacement Project for the Idaho Chemical Processing Plant at the Idaho National Engineering Laboratory. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1993-06-01T23:59:59.000Z

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0831, for the construction and operation of the High-Level Waste Tank Farm Replacement (HLWTFR) Project for the Idaho Chemical Processing Plant located at the Idaho National Engineering Laboratory (INEL). The HLWTFR Project as originally proposed by the DOE and as analyzed in this EA included: (1) replacement of five high-level liquid waste storage tanks with four new tanks and (2) the upgrading of existing tank relief piping and high-level liquid waste transfer systems. As a result of the April 1992 decision to discontinue the reprocessing of spent nuclear fuel at INEL, DOE believes that it is unlikely that the tank replacement aspect of the project will be needed in the near term. Therefore, DOE is not proposing to proceed with the replacement of the tanks as described in this-EA. The DOE`s instant decision involves only the proposed upgrades aspect of the project described in this EA. The upgrades are needed to comply with Resource Conservation and Recovery Act, the Idaho Hazardous Waste Management Act requirements, and the Department`s obligations pursuant to the Federal Facilities Compliance Agreement and Consent Order among the Environmental Protection Agency, DOE, and the State of Idaho. The environmental impacts of the proposed upgrades are adequately covered and are bounded by the analysis in this EA. If DOE later proposes to proceed with the tank replacement aspect of the project as described in the EA or as modified, it will undertake appropriate further review pursuant to the National Environmental Policy Act.

  10. EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

  11. EIS-0350-S1: Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico

    Broader source: Energy.gov [DOE]

    This Supplemental EIS evaluates the completion of the Chemistry and Metallurgy Research Building Replacement (CMRR) Project, which consists of constructing the nuclear facility portion (CMRR-NF) at Los Alamos National Laboratory (LANL). The CMRR Project provides the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building. Because of recent detailed site geotechnical investigations, certain aspects of the CMRR-NR project have changed resulting in change to the environmental impacts.

  12. Economic and Conservation Evaluation of Capital Renovation Projects: Cameron County Irrigation District No. 2 (San Benito) – Interconnect Between Canals 39 and 13-A1 and Replacement of Rio Grande Diversion Pumping Plant

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

    2003-01-01T23:59:59.000Z

    ’s Endorsement of RGIDECON © 1 This report contains economic and financial analyses results for a capital rehabilitation project proposed by the Cameron County Irrigation District No. 2 (a.k.a. San Benito) in the Rio Grande Basin. Readers interested...TR-212 March 2003 Economic and Conservation Evaluation of Capital Renovation Projects: Cameron County Irrigation District No. 2 (San Benito) – Interconnect Between Canals 39 and 13-A1 and Replacement of Rio Grande Diversion Pumping Plant M. Edward...

  13. Employee Replacement Costs

    E-Print Network [OSTI]

    Dube, Arindrajit; Freeman, Eric; Reich, Michael

    2010-01-01T23:59:59.000Z

    Employee Replacement Costs Arindrajit Dube, Eric Freeman andproperties of employee replacement costs, using a panel2008. We establish that replacement costs are sub- stantial

  14. Economic and Conservation Evaluation of Capital Renovation Projects: Harlingen Irrigation District Cameron County No. 1 Canal Meters and Telemetry Equipment, Impervious-Lining of Delivery Canals, Pipelines Replacing Delivery Canals, and On-Farm Delivery-Site Meters

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

    TR-202 October 2002 Economic and Conservation Evaluation of Capital Renovation Projects: Harlingen Irrigation District Cameron County No. 1 – Canal Meters and Telemetry Equipment, Impervious-Lining of Delivery Canals, Pipelines Replacing Delivery... Canals, and On-Farm Delivery-Site Meters M. Edward Rister Ronald D. Lacewell Allen W. Sturdivant John R. C. Robinson Michael C. Popp John R. Ellis Texas Water Resources Institute Texas A&M University TR-202 October 2002 Economic and Conservation...

  15. Employee Replacement Costs

    E-Print Network [OSTI]

    Dube, Arindrajit; Freeman, Eric; Reich, Michael

    2010-01-01T23:59:59.000Z

    Samuel Schenker, “The Costs of Hir- u ing Skilled Workers”,Employee Replacement Costs Arindrajit Dube, Eric Freeman andof employee replacement costs, using a panel survey of

  16. First SNS Target Replacement

    E-Print Network [OSTI]

    McDonald, Kirk

    First SNS Target Replacement Experience M. Dayton, M. Rennich, Van Graves, J. DeVore Presented by T.S. Department of Energy AHIP Workshop Oct. 2009 Overview · Initial Target Replacement · Target Maintenance-Battelle for the U.S. Department of Energy AHIP Workshop Oct. 2009 First SNS Target Replacement · Replacement

  17. CX-008691: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Mason Substation Metering Replacement Project CX(s) Applied: B1.7 Date: 06/25/2012 Location(s): Washington Offices(s): Bonneville Power Administration

  18. CX-008683: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Shaniko Radio Station Replacement Project CX(s) Applied: B1.19 Date: 07/11/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  19. CX-008803: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Milling Machine Replacement Projects CX(s) Applied: B1.31 Date: 05/14/2012 Location(s): Tennessee Offices(s): Y-12 Site Office

  20. CX-010155: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Augspurger Radio Tower Replacement Project CX(s) Applied: B1.19 Date: 04/03/2013 Location(s): Washington Offices(s): Bonneville Power Administration

  1. Energy Replacement Generation Tax Exemption

    Broader source: Energy.gov [DOE]

    Under the Energy Replacement Generation Tax Exemption, the following facilities are exempt from the replacement tax:

  2. Analyzing Replacement Stock Alternatives

    E-Print Network [OSTI]

    Falconer, Lawrence; McGrann, James M.; Parker, John; Jones, Rodney

    2008-10-21T23:59:59.000Z

    Replacement management strategy involves comparing the values of the breeding stock you own with the value of potential replacements, and then choosing the investment with the highest expected worth. This publication discusses the application...

  3. Heavy-Duty Natural Gas Drayage Truck Replacement Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Heavy-Duty Natural Gas Drayage Truck Replacement Program Principal Investigator: Vicki White South Coast Air Quality Management District May 16, 2012 Project ID ARRAVT045 This...

  4. Radiation Source Replacement Workshop

    SciTech Connect (OSTI)

    Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

    2010-12-01T23:59:59.000Z

    This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

  5. Diploma Replacement Order diploma-replace 1/12

    E-Print Network [OSTI]

    Shamos, Michael I.

    Diploma Replacement Order diploma-replace 1/12 A replacement diploma may be ordered in the event of loss of or damage to the original diploma. Replacement diplomas are 17Ă? 14 ("mini" diplomas or letter-sized diplomas are no longer available). The replacement diploma fee is $50, payable by check or credit card

  6. Video face replacement

    E-Print Network [OSTI]

    Dale, Kevin

    We present a method for replacing facial performances in video. Our approach accounts for differences in identity, visual appearance, speech, and timing between source and target videos. Unlike prior work, it does not ...

  7. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    Facts & Figures: Budget: Ł3,500,000 Funding Source: SRIF III Construction Project Programme: StartProject Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors of work includes: · Building fabric replacement and revised space planning · New mechanical and electrical

  8. REQUEST FOR REPLACEMENT DIPLOMA Name: ________________________________________________________________________

    E-Print Network [OSTI]

    Gering, Jon C.

    REQUEST FOR REPLACEMENT DIPLOMA Name. ________________________________________________________________________ First Middle Maiden Last REPLACEMENT DIPLOMA INFORMATION Please print your name exactly as you want it to appear on your replacement diploma. If your name has changed since your degree was awarded, and if you

  9. Grand Coulee Transmission Line Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist.NewofGeothermal Heat PumpJorgeAtlGrad.Employee,

  10. Trotter's product formula for projections

    E-Print Network [OSTI]

    Shvydkoy, Roman

    -semigroup etB is replaced by the simplest of degenerate semigroups, i.e. a projection P L P denotes a bounded projection. Now, in (1) we replace the C0-semigroup etB by the continuous

  11. Fluidized bed boiler convective zone tube replacement

    SciTech Connect (OSTI)

    Not Available

    1991-03-21T23:59:59.000Z

    A major problem with the Georgetown University Atomspheric-Pressure, Fluidized-Bed Combustor-Boiler (GU AFBC) experienced during the first six years of operation was tube erosion. Previous corrective measures for in-bed tube erosion appeared to be effective, but excessive wear of the convective zone tubes was still occurring, and the entire heat transfer tube bundle in the boiler required replacement. In the planned project,the eroded tubes would be replaced, and the convective zone modified to eliminate the problem. Progress is discussed.

  12. Developing Business Case for Electrical System Replacement

    E-Print Network [OSTI]

    Miller, Carles

    2006-05-19T23:59:59.000Z

    and distribution equipment. This paper is a great resource for technical information concerning failure rates of electrical system protective relaying. ?Upgrading and Enhancing the Generator Protection System by Making Use of Digital Systems?, published.... This paper focus on upgrading generation plant electrical systems and is a good reference for performing generator relay protection upgrades. Chapter 2 ? Literature Review Page 7 of 47 Developing Business Case For Electrical System Replacement Projects...

  13. Microsoft Word - CX-CircuitBreakerReplacementsMultipleSubstationsFY12...

    Broader source: Energy.gov (indexed) [DOE]

    12, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Michael Gilchrist Project Manager - TEP-TPP-1 Proposed Action: Power Circuit Breaker Replacement...

  14. Enzyme replacement therapy for Pompe disease

    E-Print Network [OSTI]

    Burris, Ryan Jonathan William

    2010-01-01T23:59:59.000Z

    CALIFORNIA, SAN DIEGO Enzyme Replacement Therapy for Pompe3 1.3 Enzyme Replacement Therapy for Pompe Disease…………………… 5Receptor ERT – Enzyme Replacement Therapy LSD – Lysosomal

  15. Window Replacement, Rehabilitation, & Repair Guides - Building...

    Energy Savers [EERE]

    Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Effec...

  16. WASTE DESCRIPTION TYPE OF PROJECT POUNDS REDUCED,

    E-Print Network [OSTI]

    to the manufacturer . Replaced with energy efficient light emitting diode (LED) signs. Project reduced risk of tritium

  17. Library of Science & Medicine Roof Replacement and Related Work Dec. 11, 2000 DSR # 0059-00 BSH

    E-Print Network [OSTI]

    Library of Science & Medicine Roof Replacement and Related Work Dec. 11, 2000 DSR # 0059-00 BSH AFFIDAVIT OF NON-USE OF ASBESTOS Project: Roof Replacement and Related Work at LIBRARY OF SCIENCE & MEDICINE

  18. Replacing PG and E's Milpitas terminal

    SciTech Connect (OSTI)

    Rawcliffe, R.S.; Maceyka, R.A. (Pacific Gas and Electric Co., San Francisco, CA (US))

    1991-07-01T23:59:59.000Z

    This paper reports that Pacific Gas and Electric Co.'s Milpitas Terminal was originally built in 1929, when natural gas was first brought to the San Francisco Bay Area from the Kettleman Hills gas fields. This paper reports that in 1985, a project was begun to replace the old terminal due to maintenance problems, odor complaints and unaccounted-for gas due to poor measurement quality. The location of the terminal was also a problem. A proposed highway expansion would encroach into the yard area where the existing pipeline was located. In addition, the original location was in agricultural lands, which was changing to commercial use.

  19. Virent is Replacing Crude Oil

    Broader source: Energy.gov [DOE]

    Breakout Session 2A—Conversion Technologies II: Bio-Oils, Sugar Intermediates, Precursors, Distributed Models, and Refinery Co-Processing Virent is Replacing Crude Oil Randy Cortright, Founder & Chief Technology Officer, Virent

  20. Buying Vs. Raising Replacement Heifers

    E-Print Network [OSTI]

    Cleere, Jason

    2006-01-02T23:59:59.000Z

    When deciding on the best strategy for replacing heifers, beef cattle producers should weigh several factors. This publication discusses several such issues, including current and future market prices; herd size; pastures, facilities and management...

  1. CX-007521: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    MPLE Test Stand Replacement Project CX(s) Applied: B1.3, B1.27, B1.31 Date: 12/15/2011 Location(s): Tennessee Offices(s): Y-12 Site Office

  2. CX-008248: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Idaho National Laboratory (INL) Closed Circuit Television (CCTV) Replacement Project CX(s) Applied: B2.2 Date: 04/07/2012 Location(s): Idaho Offices(s): Nuclear Energy

  3. CX-000683: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    3: Categorical Exclusion Determination CX-000683: Categorical Exclusion Determination Materials and Fuel Complex Dial Room Replacement Project CX(s) Applied: B1.7, B1.15 Date: 02...

  4. CX-008802: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Dry Pipe System Sprinkler Piping Replacement Projects CX(s) Applied: B1.3 Date: 05/14/2012 Location(s): Tennessee Offices(s): Y-12 Site Office

  5. CX-010738: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration

  6. CX-010735: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

  7. CX-010729: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    2013 Chemawa District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 08/12/2013 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration

  8. CX-012004: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    2014 Chemawa District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 04/28/2014 Location(s): Oregon, Oregon, Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration

  9. CX-012005: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    2014 Alvey District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 04/28/2014 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration

  10. CX-011994: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Marion-Alvey Marion-Lane Insulator Replacement Project CX(s) Applied: B1.3 Date: 04/07/2014 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

  11. CX-010718: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Replacement Ventilation System for the Main Plant Process Building CX(s) Applied: B6.3 Date: 07/11/2013 Location(s): New York Offices(s): West Valley Demonstration Project

  12. CX-008696: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Power Circuit Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/12/2012 Location(s): Washington, Oregon, Idaho, Montana, Wyoming Offices(s): Bonneville Power Administration

  13. Anytime Replanning Using Local Subplan Replacement

    E-Print Network [OSTI]

    Ferrer, Gabriel J.

    Anytime Replanning Using Local Subplan Replacement A Dissertation Presented to the faculty how local subplan replacement can be utilized to implement an anytime planning system that devises new plans to accommodate plan failures. Local subplan replacement consists of selecting subsequences

  14. Do You Have Windows That Need Replacing?

    Broader source: Energy.gov [DOE]

    Do you have windows that need replacing, too? Do you have any plans to replace them with newer, more efficient windows?

  15. HVAC & Building Management Control System Energy Efficiency Replacements

    SciTech Connect (OSTI)

    Hernandez, Adriana

    2012-09-21T23:59:59.000Z

    The project objective was the replacement of an aging, un-repairable HVAC system which has grown inefficient and a huge energy consumer with low energy and efficient HVAC units, and installation of energy efficient building control technologies at City's YMCA Community Center.

  16. REPLACEMENT DIPLOMA REQUEST FORM Dear Alumni

    E-Print Network [OSTI]

    Dennett, Daniel

    REPLACEMENT DIPLOMA REQUEST FORM Dear Alumni: It is our understanding that you need to replace your original diploma. We are glad to help you attain a replacement diploma. The items listed below are required replacement diploma. Please feel free to contact the LGBT Center at 617-627-3770 if you have questions

  17. Microsoft Word - CX-Satsop-Aberdeen_Tower-Replacement_FY10_WEB...

    Broader source: Energy.gov (indexed) [DOE]

    2, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Replacement of twenty 22-L structures on the...

  18. Kittiwakes strategically reduce investment in replacement clutches

    E-Print Network [OSTI]

    Alvarez, Nadir

    Kittiwakes strategically reduce investment in replacement clutches Julien Gasparini1,*, Alexandre). In birds, egg production is lower in replacement clutches than in first clutches, but it is unknown whether the replacement clutch is produced) or from a strategic allocation of resources between the two breeding attempts

  19. Energy Efficient Buffer Cache Replacement Jianhui Yue

    E-Print Network [OSTI]

    Zhu, Yifeng

    Energy Efficient Buffer Cache Replacement Jianhui Yue Univ. of Maine, Orono jyue for buffer caching and thus cache replacement becomes critical. This paper investi- gates the tradeoff between these two interacting factors and proposes three energy-aware buffer cache replacement al- gorithm

  20. General Adaptive Replacement Policies Yannis Smaragdakis

    E-Print Network [OSTI]

    Smaragdakis, Yannis

    General Adaptive Replacement Policies Yannis Smaragdakis College of Computing Georgia Institute of Technology yannis@cc.gatech.edu ABSTRACT We propose a general scheme for creating adaptive replace- ment any two existing replacement policies so that the resulting policy provably can never perform worse

  1. Cooperative Determination on Cache Replacement Candidates

    E-Print Network [OSTI]

    Chin, Francis Y.L.

    Cooperative Determination on Cache Replacement Candidates for Transcoding Proxy Caching Keqiu Li1- mination on cache replacement candidates for transcoding proxies. An original model which determines cache replacement candidates on all can- didate nodes in a coordinated fashion with the objective of minimizing

  2. Replacement Diploma Request University of Massachusetts Lowell

    E-Print Network [OSTI]

    Massachusetts at Lowell, University of

    Replacement Diploma Request Mail to: University of Massachusetts Lowell Office of the Registrar 883. * Please use a separate form for each diploma request. * All replacement diplomas are University of Massachusetts Lowell diplomas. Replacement diplomas with the name of any predecessor institution

  3. Cache Replacement Policy Revisited Mohamed Zahran

    E-Print Network [OSTI]

    Zahran, Mohamed M.

    Cache Replacement Policy Revisited Mohamed Zahran Electrical Engineering Department City University of New York mzahran@ccny.cuny.edu Abstract Cache replacement policy is a major design parameter of any memory hierarchy. The efficiency of the replace- ment policy affects both the hit rate and the access la

  4. Article ID #eqr106 REPLACEMENT STRATEGIES

    E-Print Network [OSTI]

    Popova, Elmira

    Article ID #eqr106 REPLACEMENT STRATEGIES Elmira Popova Associate Professor, Department)-296-5795 e-mail: popovai@seattleu.edu Corresponding Contributor: Elmira Popova Keywords: Replacement Policies define what is a replacement policy for a system that fails randomly in time and its main characteristics

  5. Replacement Diploma Request University of Massachusetts Lowell

    E-Print Network [OSTI]

    Massachusetts at Lowell, University of

    Replacement Diploma Request Mail to: University of Massachusetts Lowell Office of the Registrar 220. * Please use a separate form for each diploma request. * All replacement diplomas are University of Massachusetts Lowell diplomas. Replacement diplomas with the name of any predecessor institution

  6. Type-Logical Hyperedge Replacement Grammars

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Type-Logical and Hyperedge Replacement Grammars Draft Richard Moot LaBRI (CNRS), INRIA Bordeaux SW2009 #12;CONTENTS 1 Introduction 1 2 Hyperedge Replacement Grammars 3 2.1 Hypergraphs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 2.2 Hyperedge Replacement . . . . . . . . . . . . . . . . . . . . . . . 4 2.3 Hyperedge

  7. PeopleAdmin Staff Straight Replacement

    E-Print Network [OSTI]

    Hutcheon, James M.

    1 PeopleAdmin ­ Staff Straight Replacement Guide #12;2 The staff straight replacement module will be used by hiring managers to request vacant, benefited positions be advertisedAdmin system, you will see this view. To begin the staff straight replacement process, you should click BEGIN

  8. OSRAM SYLVANIA Develops High-Efficiency LED Troffer Replacement

    Broader source: Energy.gov [DOE]

    With the help of DOE funding, OSRAM SYLVANIA is developing a high-efficiency LED 2'x2' troffer replacement that is expected to be commercially available in the spring of 2012 and to be cost-competitive with existing troffers of that size. It is projected to have a light output of up to 4,000 lumens, an efficacy of more than 100 lm/W, and a CCT of 3500K.

  9. Acquisition and Project Management Awards Presentations - Ingrid...

    Energy Savers [EERE]

    - Ingrid Kolb, Director, Office of Management Secretary's Achievement Award Seismic Life-Safety, Modernization & Replacement (Seismic Ph 2)Secretary's Award for Project...

  10. Amendment 80 vessel replacement 1 Implementation and of Amendment 80 Vessel Replacement Provisions

    E-Print Network [OSTI]

    Amendment 80 vessel replacement 1 Implementation and of Amendment 80 Vessel Replacement Provisions vessels to use non-qualifying vessels in the sector, thus allowing replacement of a lost qualifying vessel of the CRP ambiguous as to whether replacement of qualifying vessels with non-qualifying vessels

  11. Progammatic mission transformation - chemistry and metallurgy research replacement (CMRR) project

    SciTech Connect (OSTI)

    Gunderson, L Nguyen [Los Alamos National Laboratory; Kornreich, Drew E [Los Alamos National Laboratory; Wong, Amy S [Los Alamos National Laboratory

    2011-01-24T23:59:59.000Z

    Nuclear posture and policy objectives are: (1) Preventing nuclear proliferation and nuclear terrorism; (2) Reducing the role of nuclear weapons in US national security strategy; (3) Maintaining strategic deterrence and stability at reduced nuclear force levels; (4) Strengthening regional deterrence and reassuring US allies and partners; and (5) Sustaining a safe, secure, and effective nuclear arsenal.

  12. EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement Project,

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S.ContaminationJuly 2011DDelphiFEA-2013.pdfBasedTheCounty,NFSCArizona

  13. Categorical Exclusion 4567, MPLE Test Stand Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced. C o w l i t z C o . CForn1Categorical8/2012 07:36FOrnI

  14. Duct Chase Sprinkler Replacement Project (4594), 5/31/2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign:INEA : Papers69ChristopherDrug-resistantEnergyDuct Chase

  15. 10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-05-01T23:59:59.000Z

    The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification.

  16. Optimal scheduling for replacing perimeter guarding unmanned ...

    E-Print Network [OSTI]

    2014-08-20T23:59:59.000Z

    difference between charging batteries, automatically replacing batteries [11] or ... the discussion below to the use of batteries and battery charge, without loss of ...

  17. LED Replacements for Linear Fluorescent Lamps Webcast

    Broader source: Energy.gov [DOE]

    In this June 20, 2011 webcast on LED products marketed as replacements for linear fluorescent lamps, Jason Tuenge of the Pacific Northwest National Laboratory (PNNL) discussed current Lighting...

  18. Vehicle Technologies and Bus Fleet Replacement Optimization

    E-Print Network [OSTI]

    Bertini, Robert L.

    1 Vehicle Technologies and Bus Fleet Replacement Optimization: problem properties and sensitivity: R41 #12;2 Abstract This research presents a bus fleet replacement optimization model to analyze hybrid and conventional diesel vehicles, are studied. Key variables affecting optimal bus type

  19. Page Replacement Algorithms To use a simulation for evaluating various page replacement algorithms studied in class.

    E-Print Network [OSTI]

    Stojmenovic, Ivan

    Operating Systems CSI3131 Lab 4 Winter 2011 Page Replacement Algorithms Objective To use a simulation for evaluating various page replacement algorithms studied in class. Description (Please read to compare the performance of each page replacement algorithm. The constructor of this class contains

  20. Blythe-Knob\t161-kV\tTransmission\tLine Cross\tArm\tReplacements\t...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 Blythe-Knob 161-kV Transmission Line Cross Arm Replacements - Continuation Sheet Project Description (continued) The wood cross arms on a number of wood H-frame structures have...

  1. Replacement solvents for use in chemical synthesis

    DOE Patents [OSTI]

    Molnar, Linda K. (Philadelphia, PA); Hatton, T. Alan (Sudbury, MA); Buchwald, Stephen L. (Newton, MA)

    2001-05-15T23:59:59.000Z

    Replacement solvents for use in chemical synthesis include polymer-immobilized solvents having a flexible polymer backbone and a plurality of pendant groups attached onto the polymer backbone, the pendant groups comprising a flexible linking unit bound to the polymer backbone and to a terminal solvating moiety. The polymer-immobilized solvent may be dissolved in a benign medium. Replacement solvents for chemical reactions for which tetrahydrofuran or diethyl may be a solvent include substituted tetrahydrofurfuryl ethers and substituted tetrahydro-3-furan ethers. The replacement solvents may be readily recovered from the reaction train using conventional methods.

  2. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01T23:59:59.000Z

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  3. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01T23:59:59.000Z

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  4. Organic agriculture cannot replace conventional agriculture

    E-Print Network [OSTI]

    Kolokolnikov, Theodore

    Organic agriculture cannot replace conventional agriculture Sina Adl , David Iron and Theodore Agriculture | Pathogen Dispersal Introduction Organic farming [1, 2] is gaining in popularity in Eu- rope, because or- ganic agriculture avoids using environmentally harmful chem- icals that pollute soil

  5. Marin County- Wood Stove Replacement Rebate Program

    Broader source: Energy.gov [DOE]

    The County of Marin has created a rebate program to encourage homeowners to remove or replace non-EPA certified wood-burning heaters (wood stoves and fireplace inserts) with cleaner burning stoves...

  6. Evaluation of alternative sign replacement strategies 

    E-Print Network [OSTI]

    McCaleb, James Bradley

    1996-01-01T23:59:59.000Z

    values and guidelines will have a significant impact on TXDOT. The objective of this thesis was to determine the most cost effective strategy for TXDOT to implement in replacing traffic signs that do not meet the expected minimum retroreflectivity values...

  7. Beyond the Replacement Paradigm: Smart Lighting

    E-Print Network [OSTI]

    Salama, Khaled

    Switches · Smart Building & Grid Interfaces · Efficient full spectrum LEDs without droop · Versatile, low - Visible Light Communications Integration of smart fixtures, networked sensors and control systemsBeyond the Replacement Paradigm: Smart Lighting Robert F. Karlicek, Jr. Director, Smart Lighting

  8. A replacement consideration in conductor economics

    E-Print Network [OSTI]

    Ciniglio Manzzo, Orlando Antonio

    1977-01-01T23:59:59.000Z

    A REPLACEMENT CONSIDERATION IN CONDUCTOR ECONOMICS A Thesis by ORLANDO ANTONIO CINIGLIO MANZZO Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE August... 1977 Major Subject: Electrical Engineering A REPLACEMENT CONSIDERATION IN CONDUCTOR ECONOMICS A Thesis ORLANDO ANTONIO CINIGLIO MANZZO Approved as to style and content by: (Chairman of Committee) // f, ', , / j (Head of Depart'ment) Member...

  9. An optimal replacement problem in aluminum production

    E-Print Network [OSTI]

    Spanks, Lisa Marie

    1992-01-01T23:59:59.000Z

    AN OPTIMAL REPLACEMENT PROBLEM IN ALUMINUM PRODUCTION Thesis by LISA MARIE SPANKS Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May 1992... Major Subject: Industrial Engineering AN OPTIMAL REPLACEMENT PROBLEM IN ALUMINUM PRODUCTION Thesis by LISA MARIE SPANKS Approved as to style and content by: Richard M. Feldman (Chair of Committee) James H. Matis (Member) ryan L. Deuermey r...

  10. A replaceable reflective film for solar concentrators

    SciTech Connect (OSTI)

    Not Available

    1991-09-01T23:59:59.000Z

    The 3M Company manufactures a silvered acrylic film called ECP-305 that is regarded as the preferred reflective film for use on stretched-membrane heliostats. However, ECP-305 will degrade in time, due to both corrosion of the silver layer and delamination at the film's silver-to-acrylic interface, and will eventually need to be replaced. 3M uses a very aggressive adhesive on this film, and once it is laminated, replacement is very difficult. The purpose of this investigation was the development of a replaceable reflector, a reflective film that can be easily removed and replaced. A replaceable reflector was successfully configured by laminating ECP-305 to the top surface of a smooth, dimensionally stable polymer film, with a removable adhesive applied to the underside of the polymer film. Several stages of screening and testing led to the selection of a 0.010-inch thick polycarbonate (GE 8030) as the best polymer film and a medium tack tape (3M Y-9425) was selected as the best removable adhesive. To demonstrate the feasibility of the replaceable reflector concept and to provide a real-time field test, the chosen construction was successfully applied to the 50-m{sup 2} SKI heliostat at the Central Receiver Test Facility at Sandia National Laboratories in Albuquerque. 4 refs., 13 figs., 7 tabs.

  11. AEP Ohio - Commercial Custom Project Rebate Program | Department...

    Energy Savers [EERE]

    Program), HVAC system replacements, and other technologies that reduce energy consumption and peak demand. The incentive payment is capped at 50% of the total project cost....

  12. CX-009197: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    2012 Spacer and Insulator Replacement Program; Hatwai-Dworshak No. 1 500-kilovolt (kV) Transmission Line Spacer Replacement Project CX(s) Applied: B1.3 Date: 09/24/2012 Location(s): Idaho, Idaho Offices(s): Bonneville Power Administration

  13. LONG TERM FILE MIGRATION - PART II: FILE REPLACEMENT ALGORITHMS

    E-Print Network [OSTI]

    Jay Smith, Alan

    2011-01-01T23:59:59.000Z

    MIGRATION· PART II: FILE REPLACEMENT ALGORITHMS Alan Jaymay vary even though replacement fi~~d the pa~ameter value PIe N - P ;, RT I r:. fILE REPLACEMENT ALGORITHMS. I.lan ~1ar

  14. REPLACEMENT/STALE DATED CHEQUE REQUEST FORM Date: ____________________________ Student Number: _________________________

    E-Print Network [OSTI]

    Sinnamon, Gordon J.

    REPLACEMENT/STALE DATED CHEQUE REQUEST FORM Date: ____________________________ Student: _________________________ Cheque Date: _____________________ CHEQUE AMOUNT: ________________________ REASON FOR REPLACEMENT Building at the address below. Please indicate how you would like to receive your replacement cheque

  15. Lambek Grammars, Tree Adjoining Grammars and Hyperedge Replacement Grammars

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Lambek Grammars, Tree Adjoining Grammars and Hyperedge Replacement Grammars Richard Moot La (tree generating) hyperedge replacement grammars as an intermediate step. As a consequence both, using hyperedge replacement grammars as an intermediate step. 2 Tree Adjoining Grammars and Hyperedge

  16. Avoiding a Train Wreck: Replacing Old Coal Plants with Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 This...

  17. Boron-10 Neutron Detectors for Helium-3 Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Homeland Security & Defense Boron-10 Neutron Detectors for Helium-3 Replacement Boron-10 Neutron Detectors for Helium-3 Replacement As part of the Laboratory's national security...

  18. Quenching and Partitioning Process Development to Replace Hot...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Partitioning Process Development to Replace Hot Stamping of High-Strength Automotive Steel Quenching and Partitioning Process Development to Replace Hot Stamping of...

  19. HP replacement program increases efficiency, protection

    SciTech Connect (OSTI)

    NONE

    1997-10-01T23:59:59.000Z

    For more than 50 years, compression equipment along the 2,000-mile Tennessee Gas Pipeline has been helping to supply natural gas needs for the Northeast. But increasing demand and a need for more environmentally safe equipment mean a major replacement program for the compressor stations that make the natural gas transmission possible. Today it is one of the longest gas pipelines in the world, carrying more than 1 Bcf/d of natural gas. New compression equipment is being installed to boost efficiency and meet more stringent environmental standards. In 1993, Tenneco Energy, purchased by El Paso Energy in December 1996, initiated a Horsepower Replacement Program intended to replace older, inefficient technology with more advanced equipment. A major objective was to improve operational effectiveness and to reduce harmful nitrogen oxide and carbon monoxide emissions by converting much of the machinery to electric-driven compression equipment.

  20. [Minor revisionposted 4/3/14 (replaces 3/23/11 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    of this Operating Policy/Procedure (OP) is to establish a standard procedure for locating exterior signsOP 61.22 [Minor revision­posted 4/3/14 (replaces 3/23/11 edition)] Operating Policy and Procedure approval, a Project Request (Attachment B, OP 61.28) will be forwarded to Operations Division Maintenance

  1. Valve assembly having remotely replaceable bearings

    DOE Patents [OSTI]

    Johnson, Evan R. (San Diego, CA); Tanner, David E. (Poway, CA)

    1980-01-01T23:59:59.000Z

    A valve assembly having remotely replaceable bearings is disclosed wherein a valve disc is supported within a flow duct for rotation about a pair of axially aligned bearings, one of which is carried by a spindle received within a diametral bore in the valve disc, and the other of which is carried by a bearing support block releasably mounted on the duct circumferentially of an annular collar on the valve disc coaxial with its diametrical bore. The spindle and bearing support block are adapted for remote removal to facilitate servicing or replacement of the valve disc support bearings.

  2. Reversing Wolbachia-based population replacement

    E-Print Network [OSTI]

    Dobson, Stephen L.

    Wolbachia bacteria as a vehicle for population replace- ment. Also discussed are strategies strategies and provide mechan- isms for the autonomous spread of desired transgenes into the targeted relative to the natural population [15­17]. Primary candidates for gene-drive strategies are autonomous

  3. Measure Guideline: Window Repair, Rehabilitation, and Replacement

    SciTech Connect (OSTI)

    Baker, P.

    2012-12-01T23:59:59.000Z

    This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

  4. THE GROWTH OF LIMITS OF VERTEX REPLACEMENT RULES

    E-Print Network [OSTI]

    Previte, Joseph P.

    THE GROWTH OF LIMITS OF VERTEX REPLACEMENT RULES JOSEPH PREVITE, MICHELLE PREVITE, AND MARY a vertex replacement rule given by exactly one replacement graph generates an infinite graph for the growth degree of infinite graphs with polynomial growth that are gener- ated by vertex replacement rules

  5. Orthopaedic Surgery Center of Joint Preservation and Replacement

    E-Print Network [OSTI]

    Oliver, Douglas L.

    Orthopaedic Surgery Center of Joint Preservation and Replacement After Total Hip Replacement new hip! You are going home after a successful total hip replacement. Although there is still much. The benefits of a total hip replacement are great, but they do take a while to be realized. Hip Precautions

  6. Orthopaedic Surgery Center of Joint Preservation and Replacement

    E-Print Network [OSTI]

    Oliver, Douglas L.

    Orthopaedic Surgery Center of Joint Preservation and Replacement After Total Knee Replacement are going home after a successful total knee replacement. Although there is still much work to do, we have replacement are great, but they do take a while to be realized. We have put together some helpful hints

  7. FY95 software project management plan: TMACS, CASS computer systems

    SciTech Connect (OSTI)

    Spurling, D.G.

    1994-11-11T23:59:59.000Z

    The FY95 Work Plan for TMACS and CASS Software Projects describes the activities planned for the current fiscal year. This plan replaces WHC-SD-WM-SDP-008. The TMACS project schedule is included in the TWRS Integrated Schedule.

  8. Flow boiling test of GDP replacement coolants

    SciTech Connect (OSTI)

    Park, S.H. [comp.

    1995-08-01T23:59:59.000Z

    The tests were part of the CFC replacement program to identify and test alternate coolants to replace CFC-114 being used in the uranium enrichment plants at Paducah and Portsmouth. The coolants tested, C{sub 4}F{sub 10} and C{sub 4}F{sub 8}, were selected based on their compatibility with the uranium hexafluoride process gas and how well the boiling temperature and vapor pressure matched that of CFC-114. However, the heat of vaporization of both coolants is lower than that of CFC-114 requiring larger coolant mass flow than CFC-114 to remove the same amount of heat. The vapor pressure of these coolants is higher than CFC-114 within the cascade operational range, and each coolant can be used as a replacement coolant with some limitation at 3,300 hp operation. The results of the CFC-114/C{sub 4}F{sub 10} mixture tests show boiling heat transfer coefficient degraded to a minimum value with about 25% C{sub 4}F{sub 10} weight mixture in CFC-114 and the degree of degradation is about 20% from that of CFC-114 boiling heat transfer coefficient. This report consists of the final reports from Cudo Technologies, Ltd.

  9. adaptive dynamic replacement: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Who Replaces Whom? Local versus Non-local Replacement in Social and Evolutionary Dynamics CERN Preprints Summary: In this paper, we inspect well-known population genetics and...

  10. Magnesium Replacement of Aluminum Cast Components in a Production...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Replacement of Aluminum Cast Components in a Production V6 Engine to Effect Cost-Effective Mass Reduction Magnesium Replacement of Aluminum Cast Components in a Production V6...

  11. Replacing an Oversized and Underloaded Electric Motor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin ofEnergy at Waste-to-Energy using Fues Cells Webinar, July0 Replace2-AIncandescent1

  12. UA Museum Expansion Project Project Manager: Carol Adamczak, 474-7362

    E-Print Network [OSTI]

    Ickert-Bond, Steffi

    . Life/Safety Renovation. Complete by February 07. Patty Ice Rink Improvements Project Manager: Marc of the Patty Ice Arena. Install new dehumidification and water treatment system inside the rink. Replace

  13. 10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

    SciTech Connect (OSTI)

    Noel Duckwtiz

    2011-05-01T23:59:59.000Z

    Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.

  14. Text-Alternative Version: LED Replacements for Linear Fluorescent Lamps

    Broader source: Energy.gov [DOE]

    Below is the text-alternative version of the "LED Replacements for Linear Fluorescent Lamps" webcast, held June 20, 2011.

  15. Computer Replacement Guidelines Environmental Health and Safety, Stanford University

    E-Print Network [OSTI]

    Computer Replacement Guidelines Environmental Health and Safety, Stanford University 17 November 2005 This document describes the guidelines for replacing laptop and desktop computers at Environmental Health and Safety. PC laptop and desktop computers will be replaced a) on an ongoing basis where

  16. Inference of Edge Replacement Graph Grammars Jacek P. Kukluk1

    E-Print Network [OSTI]

    Holder, Lawrence B.

    Inference of Edge Replacement Graph Grammars Jacek P. Kukluk1 , Lawrence B. Holder2 , and Diane J@eecs.wsu.edu Abstract We describe an algorithm and experiments for inference of edge replacement graph grammars for inference of Node Replacement Recursive Graph Grammars [7]. In this paper we describe an approach

  17. FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL

    E-Print Network [OSTI]

    L'Ecuyer, Pierre

    1 FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL Pierre L'Ecuyer, Benoit Martin, controlled by a replacement rule based on age thresholds. We show how to estimate the expected cost­ generative simulation, maintenance models, age replacement policies. #12; 2 L'ECUYER, MARTIN, AND V ' AZQUEZ

  18. 1 INTRODUCTION The replacement investment decision is clearly a

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 INTRODUCTION The replacement investment decision is clearly a strategic objective of a company for the replacement decision largely depends on the company context. However, we can summarize the motivations leading over time and prove that the replacement policy at equal intervals is optimum. However, the linear

  19. Application for Amendment 80 Vessel Replacement Page 1 of 6

    E-Print Network [OSTI]

    Application for Amendment 80 Vessel Replacement Page 1 of 6 Revised: 12/23/2013 OMB Control No. 0648-0565 Expiration Date: 01/31/2016 APPLICATION FOR AMENDMENT 80 VESSEL REPLACEMENT United States OF THE AMENDMENT 80 VESSEL BEING REPLACED 1. Vessel Name: 2. ADF&G Vessel Registration No.: 3. USCG Documentation

  20. Page Replacement and Reference Bit Emulation in Mach

    E-Print Network [OSTI]

    Page Replacement and Reference Bit Emulation in Mach Richard P. Draves rpd@cs.cmu.edu School of Computer Science Carnegie Mellon University 5000 Forbes Avenue Pittsburgh, PA 15213 Abstract A page­replacement in software. This paper describes the Mach kernel's page­replacement algorithm and considers three software

  1. The Cosmic Origins Spectrograph: A Hubble Replacement Instrument

    E-Print Network [OSTI]

    Colorado at Boulder, University of

    The Cosmic Origins Spectrograph: A Hubble Replacement Instrument for the 2002 Reservicing Mission Origins Spectrograph (COS) has recently been selected as a replacement instrument for the Hubble Space Telescope. Installation is scheduled for late 2002, replacing COSTAR, which at that time will be unnecessary

  2. Diploma Replacement Request FOR REGISTRAR'S OFFICE USE ONLY

    E-Print Network [OSTI]

    Feschotte, Cedric

    Diploma Replacement Request FOR REGISTRAR'S OFFICE USE ONLY Updated: 08/26/09 Use this form to request a replacement or additional diploma. · The name on your diploma must be the same the Registrar's Office, Registration and Records Division prior to requesting your replacement diploma

  3. Cache Replacement Policy Using Map-based Adaptive Insertion

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Cache Replacement Policy Using Map-based Adaptive Insertion Yasuo Ishii The University of Tokyo insertion policy (MAIP) for a novel cache replacement. The MAIP estimates the data reuse possibility policy. 1. INTRODUCTION The cache replacement policy plays an important role in improving system

  4. University of Utah Payroll Department Stop Payment -Replacement Form

    E-Print Network [OSTI]

    Provancher, William

    University of Utah Payroll Department Stop Payment - Replacement Form Affidavit to request replacement of a lost, stolen, or damaged, payroll check. Please note that it takes 5 to 7 days to process is given to induce a replacement check for one originally issued. 3. I agree to indemnify and hold

  5. FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL

    E-Print Network [OSTI]

    Vázquez-Abad, Felisa J.

    FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL Pierre L'Ecuyer, Benoit Martin, controlled by a replacement rule based on age thresholds. We show how to estimate the expected cost­ generative simulation, maintenance models, age replacement policies. #12; L'ECUYER, MARTIN, AND V ' AZQUEZ

  6. Node discovery and replacement using mobile Kalypso Magklara1

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Node discovery and replacement using mobile robot Kalypso Magklara1 , Dimitrios Zorbas1 and Tahiry, that discovers the nodes around it and replaces the active nodes, whose energy is drained, by fully charged and that decide, which nodes to replace. We simulate our algorithms and our findings show that all nodes that fail

  7. REPLACEMENT DIPLOMA ORDER FORM BOISE STATE REGISTRAR'S OFFICE

    E-Print Network [OSTI]

    Barrash, Warren

    REPLACEMENT DIPLOMA ORDER FORM BOISE STATE REGISTRAR'S OFFICE Administration Building, Room 110-3169 The replacement diploma will bear the signatures of the current University President and Registrar and have the words Replacement Diploma printed under the university seal. Allow 3-4 weeks for delivery. You

  8. Application for Replacement JCU Award (Certificate/Testamur) -FM-EX-VApr2012 REQUEST FOR REPLACEMENT JCU AWARD

    E-Print Network [OSTI]

    Application for Replacement JCU Award (Certificate/Testamur) - FM-EX-VApr2012 REQUEST FOR REPLACEMENT JCU AWARD (CERTIFICATE/TESTAMUR) 1. PERSONAL DETAILS JCU Student Number (8 digits): Title: rDr r after the fee is paid. · Replacement Testamurs - $70 (Diploma, Bachelor, Master and Doctoral

  9. Application Form for Replacement Diploma/Program Certificate (Form must be notarized)

    E-Print Network [OSTI]

    Application Form for Replacement Diploma/Program Certificate (Form must be notarized) Complete to Princeton University as follows: Replacement Diploma - $75 Replacement Program Certificate - $30 Please

  10. Project Year Project Title

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

  11. CX-012747: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Alcova-Miracle Mile East 115 Kilovolt Transmission Line Fiber Optic Ground Wire and Structure Replacement Project Natrona and Carbon Counties, Wyoming CX(s) Applied: B1.3, B4.7Date: 41855 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region

  12. CX-009235: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Willow Creek - Granby Tap 2.4 Kilovolt Distribution Line Structure 0/3A Pole Replacement Project CX(s) Applied: B4.6 Date: 09/20/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  13. CX-012356: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Lovell-Yellowtail No. 1 115-kilovolt Transmission Line Culvert Replacement Project, Big Horn County, Wyoming CX(s) Applied: B1.3 Date: 07/01/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  14. CX-008777: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Boysen-Thermopolis 115 Kilowolt Transmission Line Structure 15/6 Pole Replacement Project Fremont County, Wyoming CX(s) Applied: B4.6 Date: 07/02/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  15. CX-012214: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Copper Mountain-Pilot Butte 34.5 Kilovolt Transmission Line Structure Pole Replacement Project, Fremont County, Wyoming CX(s) Applied: B1.3 Date: 05/05/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  16. CX-011294: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Replace Potable Water Supply Line: Phase Two (Project Modification) CX(s) Applied: B1.3, B1.16, B1.32 Date: 10/24/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory

  17. Polymeric materials replacement issues for the LANL stockpile.

    SciTech Connect (OSTI)

    Sandoval, C. W. (Cynthia W.); Gladysz, G. M. (Gary M.); Stephens, T. S. (Thomas S.); Gleiman, S. S. (Seth S.); Mendoza, D. (Daniel); Baker, G. K. (G. Keith); Schoonover, J. R. (Jon R.); Schneider, Jim; Perry, B. (Brian); Lula, J. W.

    2002-01-01T23:59:59.000Z

    A number of materials in the LANL stockpile are no longer available due to lack of availability or environment, safety and health issues. Silastic S-5370 a polysiloxane foam used to manufacture multiple components in LANL systems has been discontinued by Dow Corning. Kerimid 601 is a polyimide resin used as the binder for the syntactic foam used as a support material in the W76. It contains MDA, which has been identified by OSHA as a carcinogen and is no longer used in the nuclear weapons complex. In addition, the Thornel carbon mat used in the syntactic foam formulation is no longer available. These issues have created major challenges in the effort to reestablish aft support production capability for the W76 LEP. Urethane Encapsulant 7200, an adhesive used to bond explosive booster pellets and detonator components, was originally manufactured by Hexcel Corporation and is no longer available. The details of the projects currently underway to provide replacements for these materials will be discussed.

  18. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    & Figures: Budget: Ł51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on SiteProject Fact Sheet Project Update: Project Brief: The concept of the new scheme is to redevelop Gardens project http://www.imperial.ac.uk/princesgardens/ Construction Project Team: Project Facts

  19. Replacement of the Advanced Test Reactor control room

    SciTech Connect (OSTI)

    Durney, J.L.; Klingler, W.B. (EG and G Idaho, Inc., Idaho Falls, ID (USA))

    1989-01-01T23:59:59.000Z

    The control room for the Advanced Test Reactor has been replaced to provide modern equipment utilizing current standards and meeting the current human factors requirements. The control room was designed in the early 1960 era and had not been significantly upgraded since the initial installation. The replacement did not change any of the safety circuits or equipment but did result in replacement of some of the recorders that display information from the safety systems. The replacement was completed in concert with the replacement of the control room simulator which provided important feedback on the design. The design successfully incorporates computer-based systems into the display of the plant variables. This improved design provides the operator with more information in a more usable form than was provided by the original design. The replacement was successfully completed within the scheduled time thereby minimizing the down time for the reactor. 1 fig., 1 tab.

  20. Project Funding

    Broader source: Energy.gov [DOE]

    Federal energy projects require funding to generate results. Carefully matching available funding options with specific project needs can make the difference between a stalled, unfunded project and a successful project generating energy and cost savings.

  1. The opportunistic replacement problem: analysis and case studies

    E-Print Network [OSTI]

    Torgny Almgren

    2009-01-22T23:59:59.000Z

    Jan 22, 2009 ... The opportunistic replacement problem: analysis and case studies. Torgny Almgren (Torgny.Almgren ***at*** volvo.com) Niclas Andreasson ...

  2. androgen replacement therapy: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    gains, replacement components are typically more energy efficient than older equipment. Life cycle cost analyses encourage... Massey, G. W. 2005-01-01 153 LATTICE PATHS, SAMPLING...

  3. arthroplasty replacement hip: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    gains, replacement components are typically more energy efficient than older equipment. Life cycle cost analyses encourage... Massey, G. W. 2005-01-01 144 LATTICE PATHS, SAMPLING...

  4. arthroplasty replacement: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Replacement of the target module was accomplished using only remote handling tooling and procedures (hands meter of high density concrete The Target Service Bay is...

  5. aegypti population replacement: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Juliano, Steven A. 6 2132014 Household explosion replaces population explosion as world concern -UPI.com http:www.upiasia.comScience-Technology20140211...

  6. Plutonium finishing plant safeguards and security systems replacement study

    SciTech Connect (OSTI)

    Klear, P.F.; Humphrys, K.L.

    1994-12-01T23:59:59.000Z

    This document provides the preferred alternatives for the replacement of the Safeguards and Security systems located at the Hanford Plutonium Finishing Plant.

  7. FORMATION OF REPLACEMENT DOLOMITE IN THE LATEMAR CARBONATE BUILDUP, DOLOMITES, NORTHERN ITALY: PART 1.

    E-Print Network [OSTI]

    Carmichael, Sarah

    FORMATION OF REPLACEMENT DOLOMITE IN THE LATEMAR CARBONATE BUILDUP, DOLOMITES, NORTHERN ITALY: PART F. McDONOUGH*** ABSTRACT. Replacement dolomite in the Latemar carbonate buildup, northern Italy of vertical columns (replacement of limestone breccia pipes) and sheets (replacement along fractures

  8. MINOR PROJECTS STATUS REPORT FAU Minor Projects Management Database Sorted By P-NUMBER Florida Atlantic University -Facilities Planning

    E-Print Network [OSTI]

    Fernandez, Eduardo

    -9-2103) Replace generator fuel tank. PendingP- Required Yes Yes 80,000 6125 MC-12 S Baruch Eliah Watlington ScottMINOR PROJECTS STATUS REPORT FAU Minor Projects Management Database Sorted By P- NUMBER Florida,000 5858 MC-05 S Baruch Eliah Watlington Scott Baruch Pending TBD TBDTBD Morganti Quote received. Project

  9. CONSTRUCTION BY REPLACEMENT: A NEW APPROACH TO SIMULATION MODELING

    E-Print Network [OSTI]

    CONSTRUCTION BY REPLACEMENT: A NEW APPROACH TO SIMULATION MODELING Authors: · James H Hines (MIT changes are needed. The paper describes an extensive experiment with using this approach to construct with another molecule. Using this tool kit, users can rapidly construct new simulation models by replacing

  10. Conveyorized Photoresist Stripping Replacement for Flex Circuit Fabrication

    SciTech Connect (OSTI)

    Megan Donahue

    2009-02-24T23:59:59.000Z

    A replacement conveyorized photoresist stripping system was characterized to replace the ASI photoresist stripping system. This system uses the qualified ADF-25c chemistry for the fabrication of flex circuits, while the ASI uses the qualified potassium hydroxide chemistry. The stripping process removes photoresist, which is used to protect the copper traces being formed during the etch process.

  11. RELIABILITY OF SAMPLING INSPECTION SCHEMES APPLIED TO REPLACEMENT STEAM GENERATORS

    E-Print Network [OSTI]

    Cizelj, Leon

    RELIABILITY OF SAMPLING INSPECTION SCHEMES APPLIED TO REPLACEMENT STEAM GENERATORS Guy Roussel the size of the random sample of tubes to be inspected in replacement steam generators is revisited in this paper. A procedure to estimate the maximum number of defective tubes left in the steam generator after

  12. 10 CFR 830 Major Modification Determination for Advanced Test Reactor RDAS and LPCIS Replacement

    SciTech Connect (OSTI)

    David E. Korns

    2012-05-01T23:59:59.000Z

    The replacement of the ATR Control Complex's obsolete computer based Reactor Data Acquisition System (RDAS) and its safety-related Lobe Power Calculation and Indication System (LPCIS) software application is vitally important to ensure the ATR remains available to support this national mission. The RDAS supports safe operation of the reactor by providing 'real-time' plant status information (indications and alarms) for use by the reactor operators via the Console Display System (CDS). The RDAS is a computer support system that acquires analog and digital information from various reactor and reactor support systems. The RDAS information is used to display quadrant and lobe powers via a display interface more user friendly than that provided by the recorders and the Control Room upright panels. RDAS provides input to the Nuclear Engineering ATR Surveillance Data System (ASUDAS) for fuel burn-up analysis and the production of cycle data for experiment sponsors and the generation of the Core Safety Assurance Package (CSAP). RDAS also archives and provides for retrieval of historical plant data which may be used for event reconstruction, data analysis, training and safety analysis. The RDAS, LPCIS and ASUDAS need to be replaced with state-of-the-art technology in order to eliminate problems of aged computer systems, and difficulty in obtaining software upgrades, spare parts, and technical support. The major modification criteria evaluation of the project design did not lead to the conclusion that the project is a major modification. The negative major modification determination is driven by the fact that the project requires a one-for-one equivalent replacement of existing systems that protects and maintains functional and operational requirements as credited in the safety basis.

  13. Instrument validation project

    SciTech Connect (OSTI)

    Reynolds, B.A.; Daymo, E.A.; Geeting, J.G.H.; Zhang, J.

    1996-06-01T23:59:59.000Z

    Westinghouse Hanford Company Project W-211 is responsible for providing the system capabilities to remove radioactive waste from ten double-shell tanks used to store radioactive wastes on the Hanford Site in Richland, Washington. The project is also responsible for measuring tank waste slurry properties prior to injection into pipeline systems, including the Replacement of Cross-Site Transfer System. This report summarizes studies of the appropriateness of the instrumentation specified for use in Project W-211. The instruments were evaluated in a test loop with simulated slurries that covered the range of properties specified in the functional design criteria. The results of the study indicate that the compact nature of the baseline Project W-211 loop does not result in reduced instrumental accuracy resulting from poor flow profile development. Of the baseline instrumentation, the Micromotion densimeter, the Moore Industries thermocouple, the Fischer and Porter magnetic flow meter, and the Red Valve Pressure transducer meet the desired instrumental accuracy. An alternate magnetic flow meter (Yokagawa) gave nearly identical results as the baseline fischer and Porter. The Micromotion flow meter did not meet the desired instrument accuracy but could potentially be calibrated so that it would meet the criteria. The Nametre on-line viscometer did not meet the desired instrumental accuracy and is not recommended as a quantitative instrument although it does provide qualitative information. The recommended minimum set of instrumentation necessary to ensure the slurry meets the Project W-058 acceptance criteria is the Micromotion mass flow meter and delta pressure cells.

  14. Project Title:

    Broader source: Energy.gov (indexed) [DOE]

    Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY 291 Project Information Date: 31 12010 Contractor Code: Project Overview In order to...

  15. Nucla CFB Demonstration Project

    SciTech Connect (OSTI)

    Not Available

    1990-12-01T23:59:59.000Z

    This report documents Colorado-Ute Electric Association's Nucla Circulating Atmospheric Fluidized-Bed Combustion (AFBC) demonstration project. It describes the plant equipment and system design for the first US utility-size circulating AFBC boiler and its support systems. Included are equipment and system descriptions, design/background information and appendices with an equipment list and selected information plus process flow and instrumentation drawings. The purpose of this report is to share the information gathered during the Nucla circulating AFBC demonstration project and present it so that the general public can evaluate the technical feasibility and cost effectiveness of replacing pulverized or stoker-fired boiler units with circulating fluidized-bed boiler units. (VC)

  16. Sustainable LED Fluorescent Light Replacement Technology

    SciTech Connect (OSTI)

    None

    2011-06-30T23:59:59.000Z

    Ilumisys and the National Center for Manufacturing Sciences (NCMS) partnered on a three-year project awarded by the United States (U.S.) Department of Energy (DOE), to quantify the impacts of LED lamps, incandescent lamps and fluorescent benchmark lamps over a product lifecycle – i.e. to develop a sustainable design and manufacturing strategy that addresses product manufacturing, use, recycling and disposal scenarios for LED-based lighting. Based on the knowledge gained from extensive product tear-down studies of fluorescent and screw-in lighting products, lifecycle assessment tools, and accelerated lifecycle testing protocols, an interactive Sustainable LED Design Guide has been developed to aid architectural and lighting designers and engineers in making design decisions that consider three important environmental impacts (greenhouse gas emissions, energy use and mercury emission) across all phases of the life of an LED lighting product. Critical information developed for the lifecycle analysis and product feature comparisons is the useful life of the lighting product as well as its performance. The Design Guide is available at www.ncms.org, and was developed based on operational and durability testing of a variety of lighting products including power consumption, light output, and useful life of a lamp in order to allow a more realistic comparison of lamp designs. This report describes the main project tasks, results and innovative features of the lifecycle assessment (LCA)-based design tools, and the key considerations driving the sustainable design of LED lighting systems. The Design Guide incorporates the following three novel features for efficiently evaluating LED lighting features in value-chains: • Bill-of-Materials (BOM) Builder – Designers may import process data for each component and supply functional data for the product, including power, consumption, lumen output and expected useful life. • Environmental Impact Review – Designs are comparable across lifecycle phases, subsystems, and environmental impact category, and can be normalized to a userdefined functional unit. • Drill-down Review – These provide an indepth look at individual lamp designs with the ability to review across subsystem or lifecycle phase.

  17. 10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-05-01T23:59:59.000Z

    The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the 50-year-old obsolescent marine diesels with commercial power that is backed with safety related emergency diesel generators, switchgear, and uninterruptible power supply (UPS). The second project, the subject of this major modification determination, will replace the four, obsolete, original primary coolant pumps (PCPs) and motors. Completion of this and the two other age-related projects (replacement of the ATR diesel bus [E-3] and switchgear and replacement of the existent emergency firewater injection system) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification: 1. Evaluation Criteria #3 (Change of existing process). The proposed strategy for equipping the replacement PCPs with VFDs and having the PCPs also function as ECPs will require significant safety basis changes requiring DOE approval. 2. Evaluation Criteria #4 (Use of new technology). The use of VFD and VFD “pump catcher” technology for the PCPs is not currently in use and has not been previously formally reviewed/approved by DOE for ATR. It is noted that VFD technology has several decades of commercial use and experience. However, the ATR probabilistic risk assessment will have to be updated, reflecting the changes for supplying ECP flows including VFD reliability, to confirm that the proposed activity maintains or reduces the CDF for the ATR. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). It is expected that the proposed activity will result in a revised list of safety-related SSCs. Specifically, as currently proposed, the existing ECPs will be deleted from the list. The PCPs and their associated components, picking up the ECP function, will be classified as safety-related active Seismic Category I.

  18. Collector main replacement at Indianapolis Coke

    SciTech Connect (OSTI)

    Sickle, R.R. Van

    1997-12-31T23:59:59.000Z

    Indianapolis Coke is a merchant coke producer, supplying both foundry and blast furnace coke to the industry. The facility has three coke batteries: two 3 meter batteries, one Wilputte four divided and one Koppers Becker. Both batteries are underjet batteries and are producing 100% foundry coke at a net coking time of 30.6 hours. This paper deals with the No. 1 coke battery, which is a 72 oven, gun fired, 5 meter Still battery. No. 1 battery produces both foundry and blast furnace coke at a net coking rate of 25.4 hours. No. 1 battery was commissioned in 1979. The battery is equipped with a double collector main. Although many renovations have been completed to the battery, oven machinery and heating system, to date no major construction projects have taken place. Deterioration of the collector main was caused in part from elevated levels of chlorides in the flushing liquor, and temperature fluctuations within the collector main. The repair procedures are discussed.

  19. Ultrasound image guided acetabular implant orientation during total hip replacement

    DOE Patents [OSTI]

    Chang, John; Haddad, Waleed; Kluiwstra, Jan-Ulco; Matthews, Dennis; Trauner, Kenneth

    2003-08-19T23:59:59.000Z

    A system for assisting in precise location of the acetabular implant during total hip replacement. The system uses ultrasound imaging for guiding the placement and orientation of the implant.

  20. Laboratory Evaluation of LED T8 Replacement Lamp Products

    SciTech Connect (OSTI)

    Richman, Eric E.; Kinzey, Bruce R.; Miller, Naomi J.

    2011-05-23T23:59:59.000Z

    A report on a lab setting analysis involving LED lamps intended to directly replace T8 fluorescent lamps (4') showing light output, power, and economic comparisons with other fluorescent options.

  1. Replacement of Data from IHS With Those from HPDI

    U.S. Energy Information Administration (EIA) Indexed Site

    Replacement of Data from IHS With Those from HPDI The EIA-914 estimation methodology published in September 2005 used data from IHS, Inc., as a source for calibration of historical...

  2. Washington State Department of Ecology: Replacement Wells Requiring...

    Open Energy Info (EERE)

    Ecology: Replacement Wells Requiring a Water Right Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Washington State Department of...

  3. Drop-in replacement biofuels : meeting the challenge

    E-Print Network [OSTI]

    Bhargava, Alok (Alok Kishore)

    2011-01-01T23:59:59.000Z

    This thesis presents a discussion on the challenges that must be met to fulfill the U.S. Navy's strategic imperatives for its energy vision. It provides an introduction to drop-in replacement biofuels, the options amongst ...

  4. Replace Pressure-Reducing Valves with Backpressure Turbogenerators

    SciTech Connect (OSTI)

    Not Available

    2006-01-01T23:59:59.000Z

    This revised ITP steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  5. Replacing Motors Counting Savings: Results from a 100 Motor Study

    E-Print Network [OSTI]

    Kaufman, N. M.

    2006-01-01T23:59:59.000Z

    REPLACING MOTORS, COUNTING SAVINGS: RESULTS FROM A 100 MOTOR STUDY Nicole M. Kaufman Motor Systems Engineer Advanced Energy Raleigh, NC ABSTRACT Software tools such as MotorMaster+ aid facility personnel in conducting payback... analyses for replacing motors. These tools make assumptions on the motors’ operational efficiency in their calculations. By observing 100 pre-EPCA (Energy Policy & Conservation Act) motors in operation, removing them from service and conducting IEEE...

  6. Prioritizing Water Pipe Replacement and Rehabilitation by Evaluating Failure Risk

    E-Print Network [OSTI]

    Lee, Sang Hyun

    2012-02-14T23:59:59.000Z

    PRIORITIZING WATER PIPE REPLACEMENT AND REHABILITATION BY EVALUATING FAILURE RISK A Thesis by SANG HYUN LEE Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements... 2011 Sang Hyun Lee PRIORITIZING WATER PIPE REPLACEMENT AND REHABILITATION BY EVALUATING FAILURE RISK A Thesis by SANG HYUN LEE Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment...

  7. Replacing Motors Counting Savings: Results from a 100 Motor Study 

    E-Print Network [OSTI]

    Kaufman, N. M.

    2006-01-01T23:59:59.000Z

    REPLACING MOTORS, COUNTING SAVINGS: RESULTS FROM A 100 MOTOR STUDY Nicole M. Kaufman Motor Systems Engineer Advanced Energy Raleigh, NC ABSTRACT Software tools such as MotorMaster+ aid facility personnel in conducting payback... analyses for replacing motors. These tools make assumptions on the motors’ operational efficiency in their calculations. By observing 100 pre-EPCA (Energy Policy & Conservation Act) motors in operation, removing them from service and conducting IEEE...

  8. Diploma Replacement Request Form Students who have misplaced or lost their original diplomas may order a replacement diploma. The cost for each

    E-Print Network [OSTI]

    Guenther, Frank

    Diploma Replacement Request Form Students who have misplaced or lost their original diplomas may order a replacement diploma. The cost for each replacement diploma is $25.00 ($35.00 for D.M.D, J.D., LL.M., and M.D). Please fill out the applicable information and mail it to the address below. Replacement

  9. Project Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  10. Atom Replacement in Hypergraphs Annegret Habel 1 and Renate Klempien-Hinrichs 2

    E-Print Network [OSTI]

    Habel, Annegret

    Atom Replacement in Hypergraphs Annegret Habel 1 and Renate Klempien-Hinrichs 2 1 Carl v. Ossietzky. TAGT'98, Universitat-GH Paderborn, 182-189, 1998. Node replacement and hyperedge replacement are two, we combine both concepts to a concept of atom replacement that allows the replacement of the atomic

  11. Replacement of Lighting Fixtures with LED Energy Efficient Lights at the Parking Facility, Milwaukee, Wisconsin

    SciTech Connect (OSTI)

    David Brien

    2012-06-21T23:59:59.000Z

    The Forest County Potawatomi Community (FCPC or Tribe) owns a six-story parking facility adjacent to its Potawatomi Bingo Casino (the Casino) in Milwaukee, Wisconsin, as well as a valet parking facility under the Casino (collectively, the Parking Facility). The Parking Facility contained 205-watt metal halide-type lights that, for security reasons, operated 24 hours per day, 7 days per week. Starting on August 30, 2010, the Tribe replaced these fixtures with 1,760 state-of-the-art, energy efficient 55-Watt LED lights. This project resulted in an immediate average reduction in monthly peak demand of 238 kW over the fourth quarter of 2010. The average reduction in monthly peak demand from October 1 through December 31, 2010 translates into a forecast annual electrical energy reduction of approximately 1,995,000 kWh or 47.3% of the pre-project demand. This project was technically effective, economically feasible, and beneficial to the public not only in terms of long term energy efficiency and associated emissions reductions, but also in the short-term jobs provided for the S.E. Wisconsin region. The project was implemented, from approval by U.S. Department of Energy (DOE) to completion, in less than 6 months. The project utilized off-the-shelf proven technologies that were fabricated locally and installed by local trade contractors.

  12. Boulder Canyon Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 2015 * All work is contingent on outage availability Hoover Instrument Transformer Replacement * 6 out the 12 have been replaced * 3 of the remaining will be done in...

  13. Design and development of a 3He replacement safeguards neutron counter based on 10B-lined proportional detector technology

    SciTech Connect (OSTI)

    Henzlova, Daniela [Los Alamos National Laboratory; Evans, Louise [Los Alamos National Laboratory; Menlove, Howard O. [Los Alamos National Laboratory; Swinhoe, Martyn T. [Los Alamos National Laboratory; Rael, Carlos D. [Los Alamos National Laboratory; Martinez, Isaac P. [Los Alamos National Laboratory; Marlow, Johnna B. [Los Alamos National Laboratory

    2012-07-16T23:59:59.000Z

    This presentation represents an overview of the experimental evaluation of a boron-lined proportional technology performed within an NA-241 sponsored project on testing of boron-lined proportional counters for the purpose of replacement of {sup 3}He technologies. The presented boron-lined technology will be utilized in a design of a full scale safeguards neutron coincidence counter. The design considerations and the Monte Carlo performance predictions for the counter are also presented.

  14. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's ÂŁ20

  15. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    .union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: Ł1,400,000 Funding Source: Capital PlanProject Fact Sheet Project Brief: In the first phase of the Union Building re that it adapts to meet the needs of a changing student body. The re-development plans are grounded in a full

  16. Rank Project Name Directorate, Dept/Div

    E-Print Network [OSTI]

    ,370.00 0.32 72 ft3 solid rad waste; 35 gal of mixed waste; 108 gal of haz waste; 324 ft3 of rad DIS waste 6Rank Project Name Directorate, Dept/Div and POC Cost Savings Payback (Years) Waste Reduction 1 waste 2 Replacement of Mercury Thermometers Basic Energy Sciences, Condensed Matter Physics & Material

  17. Cornell's (LSC) project began providing 16,000 tons of cooling (1 ton of cooling = 12,000 Btu/hr, or approximately one large residential window air conditioner) to Cornell University's Ithaca

    E-Print Network [OSTI]

    Keinan, Alon

    window air conditioner) to Cornell University's Ithaca campus in July of 2000. This project has almost completely replaced mechanical refrigeration for the Cornell district cooling system with the following benefits: · Greater LSC has replaced

  18. Predicting Hurricane Intensity and Structure Changes Associated with Eyewall Replacement Cycles

    E-Print Network [OSTI]

    Kossin, James P.

    Predicting Hurricane Intensity and Structure Changes Associated with Eyewall Replacement Cycles replacement cycles are commonly observed in tropical cyclones and are well known to cause fluctuations associated with eyewall replacement cycles in Atlantic Ocean hurricanes. The model input comprises

  19. Functional replacement of a primary metabolic pathway via multiple independent eukaryote-to-eukaryote gene transfers

    E-Print Network [OSTI]

    Nedelcu, Aurora M.

    Functional replacement of a primary metabolic pathway via multiple independent eukaryote can be added to the recipient's gene complement (gene additions) or simply replace existing endogenous counterparts (functional replacements). The recruitment of novel genes is thought to allow the recipient

  20. Microstructure, Mechanical Behavior, and Clinical Trade-offs in Ultra-High Molecular Weight Polyethylene for Total Joint Replacement

    E-Print Network [OSTI]

    Atwood, Sara Anne

    2010-01-01T23:59:59.000Z

    components for total joint replacement. J Bone Joint Surgcontemporary total knee replacements. Clin Orthop Relat Res(wear in total joint replacement? J Am Acad Orthop Surg, 16

  1. Wild Rose SFH DNR's largest facility Total Replacement Project Engineering Study RAS Intensive Rearing

    E-Print Network [OSTI]

    liquid oxygen tank #12;Remote controls for production wells in coldwater headtank building (HDR Senior 2,400 gpm 75 deg F 2-Stage Water Heating Heat Recovery Finish Heating #12;Moving Bed Biofilter & K1

  2. Repair and Replacement projects help FM to honor its commitment to

    E-Print Network [OSTI]

    Gulliver, Robert

    of the University. Services provided fall into three major categories: preventive maintenance, routine repairs friendly power. Energy Management is continually recognized for the superior maintenance. · Maintenance (www.facm.umn. edu/services/maintenance.html) Maintenance Operations preserves the physical assets

  3. Final Environmental Assessment for the Y-12 Steam Plant Life Extenstion Project - Steam Plant Replacement Subproject

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport inEnergy June 6-7, 2013 Meeting FederalThorium, andEIS - 0097-FAvailable593

  4. The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently AskedEnergyIssuesEnergy SolarRadioactive Liquid Waste Treatment Facility

  5. Dry Pipe Sprinkler Piping Replacement Project (4588), 4/30/2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign:INEA : Papers69ChristopherDrug-resistant TBData Series:

  6. Can Computer Simulations Replace Real Equipment in Undergraduate Laboratories?

    E-Print Network [OSTI]

    Colorado at Boulder, University of

    Can Computer Simulations Replace Real Equipment in Undergraduate Laboratories? N. D. Finkelstein, K, Boulder Abstract. This paper examines the effects of substituting computer simulations in place of real (DC) circuit laboratory was modified to compare the effects of using computer simulations

  7. Computer Integrated Revision Total Hip Replacement Surgery: Preliminary Report

    E-Print Network [OSTI]

    Taubin, Gabriel

    in a primary case because there is little good bone left and because the surgical manipulations are more deliComputer Integrated Revision Total Hip Replacement Surgery: Preliminary Report Leo Joskowicz1 milling, and the re- duction of bone sacri ced to t the new implant. Our starting points are Robodoc

  8. Replacing the whole barrel of oil with plants and microbes

    SciTech Connect (OSTI)

    Simmons, Blake

    2013-05-29T23:59:59.000Z

    In this May 13, 2013 talk, Blake Simmons discusses how scientists are exploring how plants and microbes can be used to replace many of the everyday goods we use that are derived from petroleum. To watch the entire entire Science at the Theater event, in which seven of our scientists present BIG ideas in eight minutes each.

  9. Replacing the whole barrel of oil with plants and microbes

    ScienceCinema (OSTI)

    Simmons, Blake

    2014-06-24T23:59:59.000Z

    In this May 13, 2013 talk, Blake Simmons discusses how scientists are exploring how plants and microbes can be used to replace many of the everyday goods we use that are derived from petroleum. To watch the entire entire Science at the Theater event, in which seven of our scientists present BIG ideas in eight minutes each.

  10. Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1990-08-01T23:59:59.000Z

    In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

  11. Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999

    SciTech Connect (OSTI)

    Not Available

    1990-08-01T23:59:59.000Z

    In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

  12. Electrical Equipment Replacement: Energy Efficiency versus System Compatibility

    E-Print Network [OSTI]

    Massey, G. W.

    2005-01-01T23:59:59.000Z

    upgrading electrical equipment to energy efficient models, including conductor sizing, overcurrent protective devices, grounding, and harmonics. The pages that follow provide guidance in the decision-making process when replacing electrical equipment... equipment. Several areas of compatibility must be addressed for equipment to work properly. Critical areas of concern are conductor sizing, overcurrent protection devices, grounding, and harmonics. Conductor Sizing Conductors are sized...

  13. Data Mining For Prediction of Aircraft Component Replacement

    E-Print Network [OSTI]

    Matwin, Stan

    Data Mining For Prediction of Aircraft Component Replacement Sylvain Letourneau1 Fazel Famili1 Stan the number of delays, and increasing the overall level of safety. Several data mining techniques exist from the data obtained during the operation and maintenance of aircraft is extremely challenging. Di

  14. Reducing the Replacement Overhead on COMA Protocols for Workstation-Based Architectures

    E-Print Network [OSTI]

    Llanos, Diego R.

    Reducing the Replacement Overhead on COMA Protocols for Workstation-Based Architectures Diego R discuss the behavior of the replacement mechanism of well-known COMA protocols applied to a loosely replacement mecha- nism in order to select the destination node of a replacement transaction without

  15. University of South Carolina Office of the University Registrar Request for Replacement Diploma

    E-Print Network [OSTI]

    Almor, Amit

    University of South Carolina Office of the University Registrar P F Request for Replacement Diploma Please Note Replacement diplomas are duplicates of the original diploma issued by USC. A request on the replacement diploma will reflect those of the current University Officers. Replacements can take up to 90 days

  16. Experimental study on the cause of insufficiency of a transcutaneous pulmonary valve replacement

    E-Print Network [OSTI]

    Berlin,Technische Universität

    Experimental study on the cause of insufficiency of a transcutaneous pulmonary valve replacement for the replacement of pulmonary heart valves. This technique is a minimally invasive alternative to the replacement on known causes for insufficiencies of transcutaneous heart valve replacements. Out of that information

  17. Initial submission or replacement of an Investigator's Brochure Page 1 of 2 (Version: January 25, 2012)

    E-Print Network [OSTI]

    Shoubridge, Eric

    Initial submission or replacement of an Investigator's Brochure Page 1 of 2 (Version: January 25 or Replacement of an Investigator's Brochure or Product Monograph This form replaces a letter of explanation from or replacement of an Investigator's Brochure Page 2 of 2 (Version: January 25, 2012) 5) List all forms

  18. Application for the Issue of a Replacement Transcript To apply for the issue of a replacement transcript, complete all relevant sections below and

    E-Print Network [OSTI]

    Neirotti, Juan Pablo

    Page | 1 Application for the Issue of a Replacement Transcript To apply for the issue of a replacement transcript, complete all relevant sections below and return this form to Examinations students You will not be charged for this service. A replacement transcript can be supplied

  19. Magnesium Projects

    Broader source: Energy.gov (indexed) [DOE]

    cyberinfrastructure projects and will be augmented by original research in Computer Science and Software Engineering towards the creation of large, distributed, autonomic and...

  20. Project Construction

    Broader source: Energy.gov [DOE]

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  1. UIUC Collector Erosion and Optical Lifetime Project Results: Time Dependent Exposures

    E-Print Network [OSTI]

    Spila, Timothy P.

    UIUC Collector Erosion and Optical Lifetime Project Results: Time Dependent Exposures Darren A is the lifetime of collector optics. Frequent replacement of the mirror system will detract from the economic

  2. Replacement geometry and fabrics of Smackover (Jurassic) dolomite, southern Alabama

    SciTech Connect (OSTI)

    Barrett, M.L.

    1986-09-01T23:59:59.000Z

    The intensity of dolomitization and associated reservoir development in the Smackover Formation, Conecuh Ridge-Wiggens arch areas, is not predictable by comparison with time-temperature index methods or porosity-depth curves. Major alteration patterns and associated dolomite fabrics reflect the early paleotopographic settings, where high fluid flux and massive replacement are associated with Late Jurassic basement highs. This large-scale replacement is most important in the lowermost Smackover section overlying the Norphlet sandstone from Chunchula field into the Manila Embayment. The heterogeneous nature of dolomite reservoir development is evident in Chunchula field, where local pods of permeable dolomite cut across sedimentary facies boundaries. Predicting the orientation of a dolomite permeability barrier where there is little well control can be facilitated by mapping the regional thickness variations; the extension of impermeable dolomite trends is generally parallel to isopach trends.

  3. Measure Guideline: Air Conditioner Diagnostics, Maintenance, and Replacement

    SciTech Connect (OSTI)

    Springer, D.; Dakin, B.

    2013-03-01T23:59:59.000Z

    This guideline responds to the need for an efficient means of identifying, diagnosing, and repairing faults in air conditioning systems in existing homes that are undergoing energy upgrades. Inadequate airflow due to constricted ducts or undersized filters, improper refrigerant charge, and other system defects can be corrected at a fraction of the cost of equipment replacement and can yield significant savings. The guideline presents a two-step approach to diagnostics and repair.

  4. A computerized methodology for selecting projects in multi-period bridge management systems

    E-Print Network [OSTI]

    Rebolledo Valenzuela, Carlos Esteban

    1990-01-01T23:59:59.000Z

    -effective decisions in a short or in a long range scenario. The purpose of this research is to develop and computerize a multi- period optimization procedure that will select the best set of replacement/rehabilitation projects for a given system of bridges.... 1. 1 Project Significance According to a Report to Congress by the Federal Highway Administration (FHWA, 1987), it is estimated that more than $50 billion would be needed to replace or rehabilitate today's deficient bridges in the United States...

  5. Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered...

    Energy Savers [EERE]

    Energy Program project results in annual estimated cost savings of 313,000 for reduced consumption of gasoline, diesel, propane, and electricity. Location Arizona Partners State...

  6. Quenching and Partitioning Process Development to Replace Hot...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Future AHSS: MartensiteAustenite mstr Quenching and Partitioning (Q&P) process Speer et al., 2003 53 Technical Approach Project serves needs of the automotive industry...

  7. Project Manager

    Broader source: Energy.gov [DOE]

    A successful candidate in this position will serve as a project manager in the Fuel Cell Technologies Office in the DOE-EERE Office of Transportation responsible for a wide variety of highly...

  8. RENOTER Project

    Broader source: Energy.gov [DOE]

    Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE materials, as well as efficient material integration and production process.

  9. Safeguards and Security Program and Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-04-18T23:59:59.000Z

    The proposed revision to this Department of Energy Guide focuses on alignment of guidance for implementing key safeguard and security components to the DOE capital asset acquisition process with the revised DOE O 413.3B, Program and Project Management for Acquisition of Capital Assets, the revised DOE O 470.4B, Safeguard and Security Program, and the new series of DOE Orders replacing the DOE M 470.4 series of manuals.

  10. Overview of CFC replacement issues for household refrigeration

    SciTech Connect (OSTI)

    Vineyard, E.A. [Oak Ridge National Lab., TN (United States); Roke, L. [Fisher and Paykel, Auckland (New Zealand); Hallett, F. [Frigidaire, Washington, DC (United States)

    1991-12-31T23:59:59.000Z

    In 1974, the famous ozone depletion theory of Rowland and Molina claimed that chlorofluorocarbons (CFCs) diffuse into the stratosphere where they are broken down by photolysis to release chlorine atoms that catalytically destroy ozone. Although the understanding of the science is still imperfect, there is little doubt that CFCs play a major role in the Antarctic ozone hole phenomenon and the decline in ozone observed in the rest of the world. Another issue that has become increasingly important is the potential of CFCs to change the earth`s temperature and to modify the climate. While the main impact in global warming is made by increased concentrations of carbon dioxide, CFCs and other trace gases also contribute to this effect. In an effort to respond to the global environmental threat, a CFC protocol was adopted during a diplomatic conference in Montreal. This document, known as the Montreal Protocol, was ratified in 1988 and put into effect on January 1, 1989. In accordance with Article 6 of the Montreal Protocol, the countries that signed the agreement shall periodically assess the control measures provided for in the Protocol. As part of that assessment process, household refrigeration was investigated to determine the status of CFC-12 replacements. The conclusion was that much progress has been made towards finding a suitable replacement. Compressors designed for HFC-134a have efficiencies comparable to those for CFC-12 and acceptable reliability tests have been obtained with ester lubricants. In addition, other replacements such as R-152a and refrigerant mixtures exist, but will require more study. Cycle options, such as the Stirling cycle, may be viable, but are further out in the future. The impact of new refrigerants is expected to result in elimination of CFC-12 consumption in developed countries by 1997 and in developing countries by 2005.

  11. Geography Access Control / Identification Application Application Type: New Update/Addition Replacement Temporary

    E-Print Network [OSTI]

    California at Santa Barbara, University of

    /Addition Replacement Temporary The following is to be completed by the employee (type or print legibly): Last name _____________________ $15 Access & Identification, $10 Identification Card only, $10 replacement fee for either Affiliation

  12. RandomString is a small web application, containing one java servlet. It allows users to enter a list of strings to be randomly chosen with two options: with replacement or without replacement (default).

    E-Print Network [OSTI]

    Offutt, Jeff

    a list of strings to be randomly chosen with two options: with replacement or without replacement of strings and choosing them randomly with two options: with replacement or without replacement (default strings are separated by carriage return. 2. User selects to randomly choose strings `without replacement

  13. Height Replacement of Selected Woody Plants Following Burning or Shredding.

    E-Print Network [OSTI]

    Hamilton, W.T.; Kitchen, L.M.; Scifres, C.J.

    1981-01-01T23:59:59.000Z

    periods. %e e ' riment was designed as a rm=trd cmnplete+bloCL deskgn with t a o repticatbms. T h g S i g h empioped 9 h e - 'hie -wewin bo:*iriny of the l&a ' dfded o P - the plots (Scifps 1ss81. i?w ~rmeYIt l~p-m~tr lLed ltjeIt'trcwMs, 3.T by...- tions accounted for 87 pecmt of the variation in height change of blackbrush acacia. Burning did -@t affect height increase based on comparison with unburned blackbrush acacia. Blackbrush acacia height replacement was slower than that of honey mes...

  14. California: SQAMD Replaces Drayage Trucks with CNG | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube platformBuilding RemovalCSS Letter -September 16,DOECalifornia: SQAMD Replaces

  15. Cobalt discovery replaces precious metals as industrial catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisiting the TWPSuccessAlamosCharacterization2Climate,Cobalt discovery replaces

  16. LED T8 Replacement Lamps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreaking ofOil & Gas » MethaneJohnsonKristina Pflanz About UsT8 Replacement

  17. Replacing an Oversized and Underloaded Electric Motor | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prevQuickEnergy V-Belts with Notched orEnergy Replacing

  18. Replace V-Belts with Notched or Synchronous Belt Drives

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin ofEnergy at Waste-to-Energy using Fues Cells Webinar, July0 Replace

  19. History-Dependent Optimization of Bridge Maintenance and Replacement Decisions Using Markov Decision Process

    E-Print Network [OSTI]

    Robelin, Charles-Antoine; Madanat, Samer M

    2007-01-01T23:59:59.000Z

    ?1997?. “Pontis: A system for maintenance optimization andcycle reliability-based maintenance cost optimization ofbridge inspection, maintenance and replacement optimization

  20. CX-012622: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Replace roofing system at 702-F CX(s) Applied: B1.3Date: 41799 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  1. CX-012621: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Replace 730-2B Roof CX(s) Applied: B1.3Date: 41799 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  2. CX-004217: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Replacement Facets for Central Receiver Test Facility Heliostats at the National Solar Thermal Test Facility (American Recovery and Reinvestment Act Funded) CX(s) Applied:...

  3. CX-012195: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Alfalfa Substation Control House Replacement CX(s) Applied: B4.11 Date: 05/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  4. CX-009423: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Relay and Switchboard Panel Replacements CX(s) Applied: B4.6 Date: 10/29/2012 Location(s): Arkansas Offices(s): Southwestern Power Administration

  5. Categorical Exclusion Determinations: Western Area PowerAdministratio...

    Energy Savers [EERE]

    Mountain Region May 1, 2014 CX-012073: Categorical Exclusion Determination Big George-Heart Mountain 69-Kilovolt Transmission Line Glendale Tap Replacement (Amended) CX(s)...

  6. CX-012730: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Replace West Hackberry Radio Tower CX(s) Applied: B1.19Date: 41880 Location(s): LouisianaOffices(s): Strategic Petroleum Reserve Field Office

  7. CX-012002: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Raver-Covington Conductor Replacement CX(s) Applied: B1.3 Date: 04/24/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  8. CX-010734: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration

  9. CX-012561: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Replace Department of Energy Office Trailers CX(s) Applied: B1.15Date: 41871 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  10. Dynamic Total Order Protocol Replacement Emili Miedes, Francesc D. Mu~noz-Escoi

    E-Print Network [OSTI]

    Muńoz, Francesc

    Dynamic Total Order Protocol Replacement Emili Miedes, Francesc D. Mu~noz-Esco´i InstitutoMiedesetal.:DynamicTotalOrderProtocolReplacementITI-SIDI-2012/009 #12;#12;Dynamic Total Order Protocol Replacement Emili Miedes, Francesc D. Mu~noz-Esco

  11. Mineral replacement rate of olivine by chrysotile and brucite under high alkaline conditions

    E-Print Network [OSTI]

    Montes-Hernandez, German

    Mineral replacement rate of olivine by chrysotile and brucite under high alkaline conditions Romain Available online 8 March 2012 Keywords: A1. Mineral replacement rate A1. Serpentinization A1. TG analyses B1. Alkaline medium B2. Chrysotile nanotubes a b s t r a c t Olivine mineral replacement by serpentine is one

  12. Simultaneous Replacement in Normal Programs Annalisa Bossi 1 , Nicoletta Cocco 2 , Sandro Etalle 1;3 .

    E-Print Network [OSTI]

    Cocco, Nicoletta

    Simultaneous Replacement in Normal Programs Annalisa Bossi 1 , Nicoletta Cocco 2 , Sandro Etalle 1@zenone.math.unipd.it, cocco@moo.dsi.unive.it, etalle@cwi.nl October 13, 1994 Abstract The simultaneous replacement results for Fitting's and Kunen's semantics. We also show how simultaneous replacement can mimic other

  13. Dead Block Replacement and Bypass with a Sampling Predictor Daniel A. Jimenez

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Dead Block Replacement and Bypass with a Sampling Predictor Daniel A. Jim´enez Department of Computer Science The University of Texas at San Antonio Abstract We present a cache replacement and bypass policy driven by dead block prediction. A block is considered dead is it will be replaced before

  14. evolution via the replacement of two-membrane plastids would have to be

    E-Print Network [OSTI]

    McFadden, Geoff

    evolution via the replacement of two- membrane plastids would have to be accompanied by the origin be easily overcome by assuming that four-membrane plastids have evolved via the replacement of three-membrane plastids would be an example of a secondary (replacement of a prokaryotic by a eukaryotic plastid

  15. Replacement policies for shared caches on symmetric multicores : a programmer-centric point of view

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Replacement policies for shared caches on symmetric multicores : a programmer-centric point of view-cache replacement policy can be modified for self- performance to be meaningful. Categories and Subject Descriptors multicore processor, quality of service, self-per- formance, shared cache, replacement policy, memory band

  16. Questions? Call 540/231-8636 REQUEST FOR DIPLOMA REPLACEMENT/REPRINT

    E-Print Network [OSTI]

    Buehrer, R. Michael

    Questions? Call 540/231-8636 REQUEST FOR DIPLOMA REPLACEMENT/REPRINT PAGE 1 OF 1, NOVEMBER 2013 REQUEST FOR GRADUATE DIPLOMA REPLACEMENT/REPRINT Return your completed form to: Graduate School Graduate of the replacement diploma. Current graduate diplomas measure 11" by 14". Your diploma will be printed with the legal

  17. Application for Replacement of Certificates, Permits, or Licenses Page 1 of 4

    E-Print Network [OSTI]

    Application for Replacement of Certificates, Permits, or Licenses Page 1 of 4 Revised: 12/10/2012 OMB Control No. 0648-0272 Expiration Date: 11/30/2015 APPLICATION FOR REPLACEMENT OF CERTIFICATES ­ REPLACEMENT REQUEST (Check Only the Items That Apply) PART I ­ BSAI Crab Permits and Scallop Permits [ ] Crab

  18. Biased Replacement Policies for Web Caches: Differential QualityofService and Aggregate User Value \\Lambda

    E-Print Network [OSTI]

    Jamin, Sugih

    Biased Replacement Policies for Web Caches: Differential Quality­of­Service and Aggregate User reduction to different degrees, a replacement policy which priori­ tizes cache space across servers can­frequently­used (LFU) replacement that is sensitive to varying levels of server valuation for cache hits. Through trace

  19. STATE OF CALIFORNIA DUCT LEAKAGE TEST COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM

    E-Print Network [OSTI]

    STATE OF CALIFORNIA DUCT LEAKAGE TEST ­ COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM CEC- CF-4R TESTING CF-4R-MECH-20 Duct Leakage Test ­ Completely New or Replacement Duct System (Page 1 of 3) Site, and also for completely new or replacement duct systems in existing dwellings. For existing dwellings

  20. Image-Based Texture Replacement Using Multiview Images Technion Israel Inst. of Technology

    E-Print Network [OSTI]

    Tal, Ayellet

    Image-Based Texture Replacement Using Multiview Images Doron Tal Technion ­ Israel Inst replacement is one such task. It is the process of painting a new texture over an ex- isting textured image for perform- ing texture replacement, which is based on multiview stereo tech- niques that produce depth

  1. Effects of Variation in Surgical Technique on Range of Motion in Total Knee Replacement

    E-Print Network [OSTI]

    Omiecinski, Curtis

    100 Effects of Variation in Surgical Technique on Range of Motion in Total Knee Replacement Dipnil replacement. The purpose of this study was to use computer simulation to study the effects of resecting too-tissue tensions, and articular contact forces. INTRODUCTION Total knee replacement (TKR) is a reliable and widely

  2. Interactive Material Replacement in Photographs Steve Zelinka Hui Fang Michael Garland John C. Hart

    E-Print Network [OSTI]

    Garland, Michael

    Interactive Material Replacement in Photographs Steve Zelinka Hui Fang Michael Garland John C. Hart Department of Computer Science University of Illinois at Urbana­Champaign Figure 1: Replaced materials replacement has wide application through- out the entertainment industry, particularly for post- production

  3. Varying the prior 29 Appendix C. Quality of the posterior estimates from prior replacement

    E-Print Network [OSTI]

    Varying the prior 29 Appendix C. Quality of the posterior estimates from prior replacement replacement may out-perform prior-specific training in some aspects of the quality of the estimated posterior, since the prior is known analytically, the posterior can also be estimated by prior replacement. To do

  4. Dynamic Module Replacement in Distributed Protocols Nigamanth Sridhar, Scott M. Pike, and Bruce W. Weide

    E-Print Network [OSTI]

    Weide, Bruce W.

    Dynamic Module Replacement in Distributed Protocols Nigamanth Sridhar, Scott M. Pike, and Bruce W nsridhar,pike,weide @cis.ohio-state.edu Abstract Dynamic module replacement -- the ability to hot swap-neutral technique for dynamic module replacement using Service Facilities (Serfs) -- a pattern- based design

  5. Replacement Diploma Name Change Office of Records and Registration rev. 06/11

    E-Print Network [OSTI]

    Bolding, M. Chad

    Replacement Diploma Name Change Office of Records and Registration rev. 06/11 Clemson University will provide a replacement or additional diploma to graduates of the University for a fee of $50.00 per diploma. Replacement and additional diplomas are printed on paper stock being used by the University at the time

  6. Application for a Replacement Testamur ADM18-V02/14

    E-Print Network [OSTI]

    Albrecht, David

    Application for a Replacement Testamur ADM18-V02/14 RECEIVED Please retain this copy as proof an institution that has amalgamated with Monash University may apply for a replacement testamur if their original the application form. Damaged: If you require a replacement testamur because your original testamur is damaged, we

  7. ON THE LINEAR GROWTH OF THE SPLITANDMERGE SIMULATION TREE FOR A MULTICOMPONENT AGE REPLACEMENT MODEL

    E-Print Network [OSTI]

    Vázquez-Abad, Felisa J.

    ON THE LINEAR GROWTH OF THE SPLIT­AND­MERGE SIMULATION TREE FOR A MULTICOMPONENT AGE REPLACEMENT Functional estimation, split­and­merge tree, opti­ mization, maintenance models, age replacement poli­ cies Abstract We a consider a replacement policy based on age thresholds, for a multicomponent system. We want

  8. Re^Os evidence for replacement of ancient mantle lithosphere beneath the North China craton

    E-Print Network [OSTI]

    Rudnick, Roberta L.

    Re^Os evidence for replacement of ancient mantle lithosphere beneath the North China craton Shan and was replaced by more fertile lithospheric mantle sometime after the Paleozoic. Moreover, lithospheric mantle crust (2700 Ma), suggesting that the original Archean lithosphere was replaced in the Proterozoic

  9. Energy-ef cient Cache Replacement Policies for Cooperative Caching in Mobile Ad Hoc Network

    E-Print Network [OSTI]

    Chan, Edward

    Energy-ef cient Cache Replacement Policies for Cooperative Caching in Mobile Ad Hoc Network dynamically. Most existing cache strategies perform replacement independently, and they seldom consider coordinated replacement and energy saving issues in the context of a mobile ad hoc network. In this paper, we

  10. STATE OF CALIFORNIA DUCT LEAKAGE TEST COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM

    E-Print Network [OSTI]

    STATE OF CALIFORNIA DUCT LEAKAGE TEST ­ COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM CEC- CF-6R Leakage Test ­ Completely New or Replacement Duct System (Page 1 of 3) Site Address: Enforcement Agency new or replacement duct systems in existing dwellings. For existing dwellings, a completely new

  11. Shake them all! Rethinking Selection and Replacement in MOEA/D

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Shake them all! Rethinking Selection and Replacement in MOEA/D Gauvain Marquet Bilel Derbel Arnaud-specific operators, and (iii) replace neighbors' solutions if the generated offspring is better. We remark is critical for an accurate explo- ration/exploitation balance. Moreover, the replacement mechanism (Step (iii

  12. Wood Pellets for UBC Boilers Replacing Natural Gas Based on LCA

    E-Print Network [OSTI]

    Wood Pellets for UBC Boilers Replacing Natural Gas Based on LCA Submitted to Dr. Bi By Bernard Chan Pellets for UBC Boilers Replacing Natural Gas" By Bernard Chan, Brian Chan, and Christopher Young Abstract This report studies the feasibility of replacing natural gas with wood pellets for UBC boilers. A gasification

  13. Cloudnet Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hogan, Robin

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  14. Nuclear criticality safety assessment of the proposed CFC replacement coolants

    SciTech Connect (OSTI)

    Jordan, W.C.; Dyer, H.R.

    1993-12-01T23:59:59.000Z

    The neutron multiplication characteristics of refrigerant-114 (R-114) and proposed replacement coolants perfluorobutane (C{sub 4}F{sub 10}) and cycloperfluorobutane C{sub 4}F{sub 8}) have been compared by evaluating the infinite media multiplication factors of UF{sub 6}/H/coolant systems and by replacement calculations considering a 10-MW freezer/sublimer. The results of these comparisons demonstrate that R-114 is a neutron absorber, due to its chlorine content, and that the alternative fluorocarbon coolants are neutron moderators. Estimates of critical spherical geometries considering mixtures of UF{sub 6}/HF/C{sub 4}F{sub 10} indicate that the flourocarbon-moderated systems are large compared with water-moderated systems. The freezer/sublimer calculations indicate that the alternative coolants are more reactive than R-114, but that the reactivity remains significantly below the condition of water in the tubes, which was a limiting condition. Based on these results, the alternative coolants appear to be acceptable; however, several follow-up tasks have been recommended, and additional evaluation will be required on an individual equipment basis.

  15. Spent Nuclear Fuel project, project management plan

    SciTech Connect (OSTI)

    Fuquay, B.J.

    1995-10-25T23:59:59.000Z

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  16. Nine clean coal projects chosen by DOE

    SciTech Connect (OSTI)

    Not Available

    1986-09-01T23:59:59.000Z

    On July 25, 1986 the US Department of Energy announced the nine projects selected as DOE's top choices in their Clean Coal Technology Program. The projects are: pressurized fluidized bed combustion combined cycle utility retrofit; extended tests of limestone injection multi-stage burner plus sorbent duct injection; slagging combustor with sorbent injection into combustor; gas reburning and sorbent injection retrofit into 3 utility boilers; steeply dipping bed underground coal gasification integrated with indirect liquefaction; integrated coal gasification steam injection gas turbine demonstration plants (2) with hot gas cleanup; coal-oil coprocessing liquefaction; fluidized bed gasification with hot gas cleanup integrated combined cycle demonstration plant; and direct iron ore reduction to replace coke oven/blast furnace for steelmaking. A table lists the 14 runner-up projects any of which could be selected if cooperative agreements are not reached with any of the nine companies selected. Brief descriptions are given of the nine selected projects.

  17. ERIS Project 

    E-Print Network [OSTI]

    Hunter, Philip

    repositories. If these (generally) smaller institutions wished to continue to have access to these hosted repository spaces after the end of the project, it was proposed that these repository-lite services would be administered by the SDLC (the Scottish Digital...

  18. FUEL DEVICE REPLACEMENT Use this application to request a replacement fuel access device for a device that has been lost or stolen. Use and

    E-Print Network [OSTI]

    Kirschner, Denise

    FUEL DEVICE REPLACEMENT Use this application to request a replacement fuel access device as those explained in the original Fuel Device Application and for your convenience provided on this form Information Lost Stolen Unknown Date of last known use Certification of Use I certify that fuel access device

  19. Solar Thermal Demonstration Project

    SciTech Connect (OSTI)

    Biesinger, K.; Cuppett, D.; Dyer, D.

    2012-01-30T23:59:59.000Z

    HVAC Retrofit and Energy Efficiency Upgrades at Clark High School, Las Vegas, Nevada The overall objectives of this project are to increase usage of alternative/renewable fuels, create a better and more reliable learning environment for the students, and reduce energy costs. Utilizing the grant resources and local bond revenues, the District proposes to reduce electricity consumption by installing within the existing limited space, one principal energy efficient 100 ton adsorption chiller working in concert with two 500 ton electric chillers. The main heating source will be primarily from low nitrogen oxide (NOX), high efficiency natural gas fired boilers. With the use of this type of chiller, the electric power and cost requirements will be greatly reduced. To provide cooling to the information technology centers and equipment rooms of the school during off-peak hours, the District will install water source heat pumps. In another measure to reduce the cooling requirements at Clark High School, the District will replace single pane glass and metal panels with â??Kalwallâ?? building panels. An added feature of the â??Kalwallâ?ť system is that it will allow for natural day lighting in the student center. This system will significantly reduce thermal heat/cooling loss and control solar heat gain, thus delivering significant savings in heating ventilation and air conditioning (HVAC) costs.

  20. EDITORIAL ESSAY A "Manhattan Project" for climate change?

    E-Print Network [OSTI]

    Oppenheimer, Michael

    and oil) with low-emission or carbon-free energy alternatives, but also replacing much change mitigation takes at least decades. The Manhattan Project was top-secret, centrally planned, high-priority, well-funded and beyond the reach of Congressional inspection. Moreover, participating private companies

  1. Project Name Work Description -as Approv Aug 09 Anchorage Harbor,

    E-Print Network [OSTI]

    US Army Corps of Engineers

    ; perform energy upgrades; replace underground fuel tank and heating system to meet Environmental CompliancePrimary State Corps District Project Name Work Description - as Approv Aug 09 Planned Allocation excessive maintenance. Reduces future maintenance costs. 1,000,000 AL Mobile Alabama River Lakes, AL Award 8

  2. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    Name: Centre for Assisted Robotic Surgery Number: BESS1002b Project Champion: Professor Guang-Zong Yang of the refurbishment is to renew and expand the laboratory space for Robotic Assisted Surgery at the South Kensington Campus as par to the Hamlyn Centre for Robotic Surgery. The overall programme incorpo- rates both core

  3. Selecting renal replacement therapies: what do African American and non-African American patients and their families think others should know? A mixed methods study

    E-Print Network [OSTI]

    2013-01-01T23:59:59.000Z

    making about renal replacement therapies. Qual Health ResOpen Access Selecting renal replacement therapies: what doneed to inform renal replacement therapy (RRT) decisions.

  4. The Methanol Economy Project

    SciTech Connect (OSTI)

    Olah, George; Prakash, G.K.

    2013-12-31T23:59:59.000Z

    The Methanol Economy Project is based on the concept of replacing fossil fuels with methanol generated either from renewable resources or abundant natural (shale) gas. The full methanol cycle was investigated in this project, from production of methanol through bromination of methane, bireforming of methane to syngas, CO{sub 2} capture using supported amines, co-electrolysis of CO{sub 2} and water to formate and syngas, decomposition of formate to CO{sub 2} and H{sub 2}, and use of formic acid in a direct formic acid fuel cell. Each of these projects achieved milestones and provided new insights into their respective fields. ? Direct electrophilic bromination of methane to methyl bromide followed by hydrolysis to yield methanol was investigated on a wide variety of catalyst systems, but hydrolysis proved impractical for large-scale industrial application. ? Bireforming the correct ratio of methane, CO{sub 2}, and water on a NiO / MgO catalyst yielded the right proportion of H{sub 2}:CO (2:1) and proved to be stable for at least 250 hours of operation at 400 psi (28 atm). ? CO{sub 2} capture utilizing supported polyethyleneimines yielded a system capable of adsorbing CO{sub 2} from the air and release at nominal temperatures with negligible amine leaching. ? CO{sub 2} electrolysis to formate and syngas showed considerable increases in rate and selectivity by performing the reaction in a high pressure flow electrolyzer. ? Formic acid was shown to decompose selectively to CO{sub 2} and H{sub 2} using either Ru or Ir based homogeneous catalysts. ? Direct formic acid fuel cells were also investigated and showed higher than 40% voltage efficiency using reduced loadings of precious metals. A technoeconomic analysis was conducted to assess the viability of taking each of these processes to the industrial scale by applying the data gathered during the experiments to approximations based on currently used industrial processes. Several of these processes show significant promise for industrial scale up and use towards improving our nation’s energy independence.

  5. Replace Report 02-771 October 29, 2002

    E-Print Network [OSTI]

    . Offshore Wind Farm. Horns Rev Annual Status Report for the Environmental Monitoring Programme 1st January.................................................................................................................3 1.1 Description of the Wind Farm Project at Horns Rev ........................................3 1 .............................................................................................6 1.3 Cables in the Wind Farm and to the Shore

  6. Replacement of Mushroom Cage Gastrostomy Tube Using a Modified Technique to Allow Percutaneous Replacement with an Endoscopic Tube in Patients with Amyotrophic Lateral Sclerosis

    SciTech Connect (OSTI)

    Ammar, Thoraya [King's College Hospital, Department of Radiology (United Kingdom); Rio, Alan [King's College Hospital, Department of Dietetics (United Kingdom); Ampong, Mary Ann [King's College Hospital, Department of Neurosciences (United Kingdom); Sidhu, Paul S., E-mail: paulsidhu@nhs.ne [King's College Hospital, Department of Radiology (United Kingdom)

    2010-06-15T23:59:59.000Z

    Radiologic inserted gastrostomy (RIG) is the preferred method in our institution for enteral feeding in amyotrophic lateral sclerosis (ALS). Skin-level primary-placed mushroom cage gastrostomy tubes become tight with weight gain. We describe a minimally invasive radiologic technique for replacing mushroom gastrostomy tubes with endoscopic mushroom cage tubes in ALS. All patients with ALS who underwent replacement of a RIG tube were included. Patients were selected for a modified replacement when the tube length of the primary placed RIG tube was insufficient to allow like-for-like replacement. Replacement was performed under local anesthetic and fluoroscopic guidance according to a preset technique, with modification of an endoscopic mushroom cage gastrostomy tube to allow percutaneous placement. Assessment of the success, safety, and durability of the modified technique was undertaken. Over a 60-month period, 104 primary placement mushroom cage tubes in ALS were performed. A total of 20 (19.2%) of 104 patients had a replacement tube positioned, 10 (9.6%) of 104 with the modified technique (male n = 4, female n = 6, mean age 65.5 years, range 48-85 years). All tubes were successfully replaced using this modified technique, with two minor complications (superficial wound infection and minor hemorrhage). The mean length of time of tube durability was 158.5 days (range 6-471 days), with all but one patient dying with a functional tube in place. We have devised a modification to allow percutaneous replacement of mushroom cage gastrostomy feeding tubes with minimal compromise to ALS patients. This technique allows tube replacement under local anesthetic, without the need for sedation, an important consideration in ALS.

  7. PROJECT SUMMARY

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaeferAprilOverviewEfficiencyofHSSPIAProperty Management PlanPROJECT SUMMARY 1

  8. Hallmark Project

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaefer To: CongestionDevelopmentHEADQUARTERSOutreachApril 23, 2013Project

  9. Project Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical News,Program DirectionProject ATHENA creates

  10. Project Overview

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical News,Program DirectionProject ATHENAManagement

  11. Projects | ORNL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical News,Program DirectionProject ATHENAManagementIn ThisPages

  12. Project Gnome

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70 Hg MercuryProject Final Report: HPC-Colony IIProject Gnome

  13. Project Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70 Hg MercuryProject FinalFluids |Storage Research and

  14. NEPA COMPLIANCE SURVEY Project Information Project Title:

    Broader source: Energy.gov (indexed) [DOE]

    Boxes Date: Nov. 11 , 2010 DOE Code: 6740.010.00000 Contractor Code: 8067-451 Project Lead: Anthony Bowler Project Overview 1. Brief project description include anything that...

  15. Replacing precious metals with carbide catalysts for hydrogenation reactions

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ruijun, Hou [Tsinghua Univ., Beijing (China). Beijing Key Lab. of Green Chemical Reaction Engineering and Technology; Columbia Univ., New York, NY (United States); Chen, Jingguang G. [Columbia Univ., New York, NY (United States); Brookhaven National Lab. (BNL), Upton, NY (United States); Chang, Kuan [Tsinghua Univ., Beijing (China). Beijing Key Lab. of Green Chemical Reaction Engineering and Technology; Wang, Tiefeng [Tsinghua Univ., Beijing (China). Beijing Key Lab. of Green Chemical Reaction Engineering and Technology

    2015-04-01T23:59:59.000Z

    Molybdenum carbide (Mo?C and Ni/Mo?C) catalysts were compared with Pd/SiO? for the hydrogenation of several diene molecules, 1,3- butadiene, 1,3- and 1,4-cyclohexadiene (CHD). Compared to Pd/SiO?, Mo?C showed similar hydrogenation rate for 1,3-butadiene and 1,3-CHD and even higher rate for 1,4-CHD, but with significant deactivation rate for 1,3-CHD hydrogenation. However, the hydrogenation activity of Mo?C could be completely regenerated by H? treatment at 723 K for the three molecules. The Ni modified Mo?C catalysts retained similar activity for 1,3-butadiene hydrogenation with significantly enhanced selectivity for 1-butene production. The 1-butene selectivity increased with increasing Ni loading below 15%. Among the Ni modified Mo?C catalysts, 8.6%Ni/Mo?C showed the highest selectivity to 1-butene, which was even higher selectivity than that over Pd/SiO?. Compared to Pd/SiO?, both Mo?C and Ni/Mo?C showed combined advantages in hydrogenation activity and catalyst cost reduction, demonstrating the potential to use less expensive carbide catalysts to replace precious metals for hydrogenation reactions.

  16. Replacing precious metals with carbide catalysts for hydrogenation reactions

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ruijun, Hou; Chen, Jingguang G.; Chang, Kuan; Wang, Tiefeng

    2015-04-01T23:59:59.000Z

    Molybdenum carbide (Mo?C and Ni/Mo?C) catalysts were compared with Pd/SiO? for the hydrogenation of several diene molecules, 1,3- butadiene, 1,3- and 1,4-cyclohexadiene (CHD). Compared to Pd/SiO?, Mo?C showed similar hydrogenation rate for 1,3-butadiene and 1,3-CHD and even higher rate for 1,4-CHD, but with significant deactivation rate for 1,3-CHD hydrogenation. However, the hydrogenation activity of Mo?C could be completely regenerated by H? treatment at 723 K for the three molecules. The Ni modified Mo?C catalysts retained similar activity for 1,3-butadiene hydrogenation with significantly enhanced selectivity for 1-butene production. The 1-butene selectivity increased with increasing Ni loading below 15%. Among the Nimore »modified Mo?C catalysts, 8.6%Ni/Mo?C showed the highest selectivity to 1-butene, which was even higher selectivity than that over Pd/SiO?. Compared to Pd/SiO?, both Mo?C and Ni/Mo?C showed combined advantages in hydrogenation activity and catalyst cost reduction, demonstrating the potential to use less expensive carbide catalysts to replace precious metals for hydrogenation reactions.« less

  17. Text-Alternative Version: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR®

    Broader source: Energy.gov [DOE]

    Below is the text-alternative version of the LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® webcast.

  18. atlanto-odontoid joint replacement: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Replacement of the target module was accomplished using only remote handling tooling and procedures (hands meter of high density concrete The Target Service Bay is...

  19. Percutaneous aortic valve replacement in a re-animated postmortem heart

    E-Print Network [OSTI]

    White, Jennifer; Sun, Amy; Killien, Lauren; Evangelista, Dennis

    2006-01-01T23:59:59.000Z

    implantation of heart valve prosthesis for the treatment ofF. Percutaneous aortic valve replacement: an experimentalA stentless trileaflet valve from a sheet of decellularized

  20. Feasibility/alternatives study for the planned replacement of Nuclear Material Safeguards System (NMSS)

    SciTech Connect (OSTI)

    McBride, K.C.; Russell, V.K.

    1994-10-04T23:59:59.000Z

    This document is a study which describes the NMSS replacement alternatives and provides recommended solutions. It also describes a NMSS Paradox prototype.

  1. Microsoft Word - CX-FY11PascoDistrictWoodPoleReplacement_WEB...

    Broader source: Energy.gov (indexed) [DOE]

    1, 2011 REPLY TO ATTN OF: KEPR-PASCO SUBJECT: Environmental Clearance Memorandum Toby Cossairt Lineman Foreman III - TFPF-PASCO Proposed Action: Wood pole replacement and minor...

  2. Microsoft Word - CX-PascoDistrictPoleReplacement_FY13_WEB.docx

    Broader source: Energy.gov (indexed) [DOE]

    3 REPLY TO ATTN OF: KEPRPasco SUBJECT: Environmental Clearance Memorandum Greg Wilfong Lineman Foreman III - TFPF-PASCO Proposed Action: Wood pole replacement and minor access...

  3. Microsoft Word - CX-FY11WenatcheeDistrictWoodPoleReplacement...

    Broader source: Energy.gov (indexed) [DOE]

    4, 2011 REPLY TO ATTN OF: KEPR-PASCO SUBJECT: Environmental Clearance Memorandum Terry Kugler Lineman Foreman III - TFWF-SCHULTZ Proposed Action: Wood pole replacement and minor...

  4. Microsoft Word - CX-WenatcheeDistrictPoleReplacementFY13_WEB...

    Broader source: Energy.gov (indexed) [DOE]

    2, 2013 REPLY TO ATTN OF: KEPRPasco SUBJECT: Environmental Clearance Memorandum Joseph Lauer Lineman Foreman III - TFWF-SCHULTZ Proposed Action: Wood pole replacement and minor...

  5. Microsoft Word - CX-Redmond-PilotButte-Lapine_RelayCommunicationReplac...

    Broader source: Energy.gov (indexed) [DOE]

    7, 2010 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Cleareance Memorandum Jim Riehl Electrical Engineer - TECC-CSB-2 Proposed Action: Replace a relaytransfer trip rack at...

  6. Project Management Lessons Learned

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-08-05T23:59:59.000Z

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

  7. New York Power Authority/New York City Housing Authority refrigerator replacement program, first program year evaluation. Final report

    SciTech Connect (OSTI)

    Kinney, L.F.; Lewis, G. [Synertech Systems Corp., Syracuse, NY (United States); Pratt, R.G.; Miller, J. [Pacific Northwest National Lab., Richland, WA (United States)

    1997-08-01T23:59:59.000Z

    Acting as an energy services provider, the New York Power Authority (NYPA) has initiated a long-term project through which 20,000 refrigerators per year will be replaced with the most energy-efficient units possible in apartments managed by the New York City Housing Authority (NYCHA). Using bulk purchasing as an incentive to appliance manufacturers to produce energy-efficient refrigerators suitable for use in apartments, replaced in the first year of the program, which ended in December 1996. These units, kWh per year. Savings were determined by field testing and laboratory testing of 220 existing refrigerators and 56 newly-installed units. In the next program year, a 15.0-cubic-foot Maytag refrigerator, newly-designed in response to bulk purchasing incentives, is being installed. The new unit has a label rating of 437 kWh per year, 31 percent better than 1993 energy standards. Old refrigerators removed from apartments are {open_quotes}demanufactured{close_quotes} in an environmentally-appropriate way and both metals and refrigerants are recovered for reuse.

  8. Livingston Solar Canopy Project The Project

    E-Print Network [OSTI]

    Delgado, Mauricio

    ,000 high efficiency solar panels on canopy structures over two major surface parking areasLivingston Solar Canopy Project The Project: This project entails the installation of more than 40. In conjunction with the existing 1.4 megawatt solar energy facility on this campus, this project will generate

  9. Information Visualization Graduate Project (Group Project)

    E-Print Network [OSTI]

    Rusu, Adrian

    Information Visualization Fall 2011 Graduate Project (Group Project) (100 points total) Handed out:59PM Research Article due by online submission on Sunday, December 11, 2011, 11:59PM Project Demo due last week of classes The idea of the project is to take the knowledge and background that you

  10. Model morphing and sequence assignment after molecular replacement

    SciTech Connect (OSTI)

    Terwilliger, Thomas C., E-mail: terwilliger@lanl.gov [Los Alamos National Laboratory, Mail Stop M888, Los Alamos, NM 87545 (United States); Read, Randy J. [University of Cambridge, Cambridge Institute for Medical Research, Cambridge CB2 0XY (United Kingdom); Adams, Paul D. [Lawrence Berkeley National Laboratory, One Cyclotron Road, Bldg 64R0121, Berkeley, CA 94720 (United States); Brunger, Axel T. [Stanford University, 318 Campus Drive West, Stanford, CA 94305 (United States); Afonine, Pavel V. [Lawrence Berkeley National Laboratory, One Cyclotron Road, Bldg 64R0121, Berkeley, CA 94720 (United States); Hung, Li-Wei [Los Alamos National Laboratory, Mail Stop M888, Los Alamos, NM 87545 (United States)

    2013-11-01T23:59:59.000Z

    A procedure for model building is described that combines morphing a model to match a density map, trimming the morphed model and aligning the model to a sequence. A procedure termed ‘morphing’ for improving a model after it has been placed in the crystallographic cell by molecular replacement has recently been developed. Morphing consists of applying a smooth deformation to a model to make it match an electron-density map more closely. Morphing does not change the identities of the residues in the chain, only their coordinates. Consequently, if the true structure differs from the working model by containing different residues, these differences cannot be corrected by morphing. Here, a procedure that helps to address this limitation is described. The goal of the procedure is to obtain a relatively complete model that has accurate main-chain atomic positions and residues that are correctly assigned to the sequence. Residues in a morphed model that do not match the electron-density map are removed. Each segment of the resulting trimmed morphed model is then assigned to the sequence of the molecule using information about the connectivity of the chains from the working model and from connections that can be identified from the electron-density map. The procedure was tested by application to a recently determined structure at a resolution of 3.2 Ĺ and was found to increase the number of correctly identified residues in this structure from the 88 obtained using phenix.resolve sequence assignment alone (Terwilliger, 2003 ?) to 247 of a possible 359. Additionally, the procedure was tested by application to a series of templates with sequence identities to a target structure ranging between 7 and 36%. The mean fraction of correctly identified residues in these cases was increased from 33% using phenix.resolve sequence assignment to 47% using the current procedure. The procedure is simple to apply and is available in the Phenix software package.

  11. Frequently Asked Questions: If I lose my permit, how can I get a replacement?

    E-Print Network [OSTI]

    Frequently Asked Questions: If I lose my permit, how can I get a replacement? · A $25 fee will be charged for all replacement parking permits. Will I be able to change from my current permit type to another permit type during the semester? · You may change your permit type at the beginning of a new

  12. Frequently Asked Questions: If I lose my permit, how can I get a replacement?

    E-Print Network [OSTI]

    Frequently Asked Questions: If I lose my permit, how can I get a replacement? · A $25 fee will be charged for replacement parking permits. Will I be able to change from my current permit type to another permit type during the semester? · You may change your permit type at the beginning of a new semester

  13. Roof Replacement and Related Work February 17, 2000 DSR # 0000-00 XXX

    E-Print Network [OSTI]

    Roof Replacement and Related Work February 17, 2000 DSR # 0000-00 XXX SECTION 02071 - REMOVAL # 0000-00 XXX A. Removal and disposal shall be performed in accordance with ap- plicable State 02071 - 2 (Rev. 9/00) #12;Roof Replacement and Related Work February 17, 2000 DSR # 0000-00 XXX 1

  14. Breeding nuclear fuels with accelerators: replacement for breeder reactors

    SciTech Connect (OSTI)

    Grand, P.; Takahashi, H.

    1984-01-01T23:59:59.000Z

    One application of high energy particle accelerators has been, and still is, the production of nuclear fuel for the nuclear energy industry; tantalizing because it would create a whole new industry. This approach to producing fissile from fertile material was first considered in the early 1950's in the context of the nuclear weapons program. A considerable development effort was expended before discovery of uranium ore in New Mexico put an end to the project. Later, US commitment to the Liquid Metal Fast Breeder Reactors (LMFBR) killed any further interest in pursuing accelerator breeder technology. Interest in the application of accelerators to breed nuclear fuels, and possibly burn nuclear wastes, revived in the late 1970's, when the LMFBR came under attack during the Carter administration. This period gave the opportunity to revisit the concept in view of the present state of the technology. This evaluation and the extensive calculational modeling of target designs that have been carried out are promising. In fact, a nuclear fuel cycle of Light Water Reactors and Accelerator Breeders is competitive to that of the LMFBR. At this time, however, the relative abundance of uranium reserves vs electricity demand and projected growth rate render this study purely academic. It will be for the next generation of accelerator builders to demonstate the competitiveness of this technology versus that of other nuclear fuel cycles, such as LMFBR's or Fusion Hybrid systems. 22 references, 1 figure, 5 tables.

  15. Fairbanks Geothermal Energy Project Final Report

    SciTech Connect (OSTI)

    Karl, Bernie [CHSR,LLC Owner] [CHSR,LLC Owner

    2013-05-31T23:59:59.000Z

    The primary objective for the Fairbanks Geothermal Energy Project is to provide another source of base-load renewable energy in the Fairbanks North Star Borough (FNSB). To accomplish this, Chena Hot Springs Resort (Chena) drilled a re-injection well to 2700 feet and a production well to 2500 feet. The re-injection well allows a greater flow of water to directly replace the water removed from the warmest fractures in the geothermal reservoir. The new production will provide access to warmer temperature water in greater quantities.

  16. PROJECTS IMPLEMENTED The City focused on improving the efficiency of

    E-Print Network [OSTI]

    · Replacing incandescent exit signs with new light emitting diode signs · Replacing the existing chiller

  17. Iskuulpa Watershed ProjectIskuulpa Watershed Project BPA Project # 199506001BPA Project # 199506001

    E-Print Network [OSTI]

    Hydroelectric Power Project impacts Improve natural salmonid habitat and production #12;Project ActivitiesProject Activities Land purchaseLand purchase HEP evaluationHEP evaluation Rest from livestockRest from livestock;Project ActivitiesProject Activities Land purchaseLand purchase HEP evaluationHEP evaluation Rest from

  18. Project Name Project Number Tagging Type

    E-Print Network [OSTI]

    Project Name Project Number Primary Tagging Type Secondary Tagging Type Fish Species Tagging/ Secondary Legal Driver (BiOp, MOA, Accord, etc.) Tagging Purpose Funded Entity Tagging Location Retrieval CWT Recovery Project 2010-036-00 CWT PIT Chinook, coho retrieval, analysis, address PSMFC sampling

  19. Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 48" Pipeline Replacing Main Canal – Final

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    analyses provide estimates of the economic costs per acre-foot of water savings and per BTU (kwh) of energy savings associated with one to five proposed capital improvement activity(ies) (each referred to as a component). An aggregate assessment is also.... At times, District management’s best educated estimates (or that of the consulting engineer) are used to base cost and/or savings’ values well into the future. Obviously, this is imperfect, but given resource limitations, it is believed ample inquiry...

  20. Agents for replacement of NAD+/NADH system in enzymatic reactions

    DOE Patents [OSTI]

    Fish, Richard H.; Kerr, John B.; Lo, Christine H.

    2004-04-06T23:59:59.000Z

    Novel agents acting as co-factors for replacement of NAD(P).sup.+ /NAD(P)H co-enzyme systems in enzymatic oxido-reductive reactions. Agents mimicking the action of NAD(P).sup.+ /NAD(P)H system in enzymatic oxidation/reduction of substrates into reduced or oxidized products. A method for selection and preparation of the mimicking agents for replacement of NAD(P).sup.+ /NAD(P)H system and a device comprising co-factors for replacement of NAD(P).sup.+ /NAD(P)H system.

  1. Innovative Approach to Chiller Replacement at Lafayette General Medical Center Located in Lafayette, Louisiana

    E-Print Network [OSTI]

    Poche', J. M.; Broussard, J. P.

    1998-01-01T23:59:59.000Z

    INNOVATIVE APPROACH TO CHILLER REPLACEMENT AT LAFAYETl'E GENERAL MEDICAL CENTER LOCATED IN LAFAYElTE, LOUISIANA James M. Pocbe*, P.E Mechanical EngineerIPresident Poche* Associates, Ltd. ABSTRACI' The rafavette General Medical Center is a 332... chillers. The Hospital had been monitoring the CFC issue for the past several years, and felt it was time to begin replacing its 30 year old machines. The Hospital's original plan at the time of budgeting was a one-forane replacement of chillers...

  2. Projects | Department of Energy

    Office of Environmental Management (EM)

    Projects Projects All 1703 1705 ATVM Current Portfolio 32.4 B in Loans 55 K Jobs Current Portfolio Loans 32.4 B Jobs 55,000 Loan Program Office Projects 1703 1705 ATVM...

  3. CRSP Power Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    expenses of the project each year, and receive all of the energy it produces. Salt Lake City AreaIntegrated Projects: Power from the Colorado River Storage Project plants was...

  4. Project Selection - Record Keeping

    E-Print Network [OSTI]

    Howard, Jeff W.

    2005-05-10T23:59:59.000Z

    4-H members have many project areas to choose from, depending on where they live. Members should consult with their parents and 4-H leaders when choosing a project. This publication outlines project considerations....

  5. Super Projects (Arkansas)

    Broader source: Energy.gov [DOE]

    A 2004 amendment to the state constitution authorizes the state to attract super projects by issuing bonds to fund a project’s infrastructure, limited to 5% of the net general revenues during the...

  6. Environmental Assessment for the Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement Cameron and Calcasieu Parishes, Louisiana

    SciTech Connect (OSTI)

    N /A

    2004-08-31T23:59:59.000Z

    The proposed action and three alternatives, including a No Build alternative, were evaluated along the existing RWIPL alignment to accommodate the placement of the proposed RWIPL. Construction feasibility, reasonableness and potential environmental impacts were considered during the evaluation of the four actions (and action alternatives) for the proposed RWIPL activities. Reasonable actions were identified as those actions which were considered to be supported by common sense and sound technical principles. Feasible actions were those actions which were considered to be capable of being accomplished, practicable and non-excessive in terms of cost. The evaluation process considered the following design specifications, which were determined to be important to the feasibility of the overall project. The proposed RWIPL replacement project must therefore: (1) Comply with the existing design basis and criteria, (2) Maintain continuity of operation of the facility during construction, (3)Provide the required service life, (4) Be cost effective, (5)Improve the operation and maintenance of the pipeline, and (6) Maintain minimal environmental impact while meeting the performance requirements. Sizing of the pipe, piping construction materials, construction method (e.g., open-cut trench, directional drilling, etc.) and the acquisition of new Right-of-Way (ROW) were additionally evaluated in the preliminary alternative identification, selection and screening process.

  7. Planning and Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rates Planning Ten-Year Capital Program Projects Lovell-Yellowtail Transmission Line Rebuild project Studies WACM Wind production summary overview (Oct. 2006)...

  8. Project BETA Cover Page

    E-Print Network [OSTI]

    Cover Page, Project BETA

    2012-01-01T23:59:59.000Z

    and Distribution of the Project BETA articles were funded inproduct is discussed in the BETA articles. Western JournalProject BETA: Best practices in Evaluation and Treatment of

  9. Project Finance and Investments

    Broader source: Energy.gov [DOE]

    Plenary III: Project Finance and Investment Project Finance and Investments Chris Cassidy, National Business Renewable Energy Advisor, U.S. Department of Agriculture

  10. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

  11. Operations Cost Allocation Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms...

  12. Clean Coal Projects (Virginia)

    Broader source: Energy.gov [DOE]

    This legislation directs the Virginia Air Pollution Control Board to facilitate the construction and implementation of clean coal projects by expediting the permitting process for such projects.

  13. Falls Creek Hydroelectric Project

    SciTech Connect (OSTI)

    Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

    2007-06-12T23:59:59.000Z

    This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

  14. Other Materials: Replacement Parts, Manuals, Kit Components, etc. Contact the ICE Office if you don't see a replacement part or kit component you need. We may have it!

    E-Print Network [OSTI]

    Evans, Paul G.

    Other Materials: Replacement Parts, Manuals, Kit Components, etc. Contact the ICE Office if you don't see a replacement part or kit component you need. We may have it! Item Description Price DNA Optical discount on these items.** #12;Other Materials: Replacement Parts, Manuals, Kit Components, etc. Contact

  15. Energy Policy 29 (2001) 11331143 Ethanol as a lead replacement: phasing out leaded gasoline in Africa

    E-Print Network [OSTI]

    Thomas, Valerie

    (MTBE) as strategies for replacing lead additives. The message to both audiences is the potential to increase production of aromatic and alkylated hydrocarbons, or to use the additive MTBE. The additional

  16. Case Study Walnut Hill United Methodist Church - Dallas, Texas, Chiller Replacement Analysis

    E-Print Network [OSTI]

    Phillips, J.

    1998-01-01T23:59:59.000Z

    In March of 1992 Walnut Hill United Methodist Church in Dallas, Tx. decided that their existing thermal storage and electric reciprocating chiller system were both in need of replacement. After analyzing several options, they chose to install 150...

  17. Transparent and Conductive Carbon Nanotube Multilayer Thin Films Suitable as an Indium Tin Oxide Replacement 

    E-Print Network [OSTI]

    Park, Yong Tae

    2012-07-16T23:59:59.000Z

    Transparent electrodes made from metal oxides suffer from poor flexibility and durability. Highly transparent and electrically conductive thin films based on carbon nanotubes (CNTs) were assembled as a potential indium tin oxide (ITO) replacement...

  18. Emerging Trends in Heart Valve Engineering: Part III. Novel Technologies for Mitral Valve Repair and Replacement

    E-Print Network [OSTI]

    2015-01-01T23:59:59.000Z

    and J. D. Puskas. Mitral-valve repair versus replacement forbioprosthetic heart valves. Ann. Thorac. Surg. 71:S417–mechanics of arti?cial heart valves. Clin. Exp. Pharmacol.

  19. Emerging Trends in Heart Valve Engineering: Part II. Novel and Standard Technologies for Aortic Valve Replacement

    E-Print Network [OSTI]

    2015-01-01T23:59:59.000Z

    toronto stentless porcine valve. Ann. Thorac. Surg. 78:2076–medical mechanical cardiac valve prosthesis. Ann. Thorac.or surgical aortic-valve replacement. New Engl. J. Med. 366:

  20. 1 (blue. The orange problem is the same with 999 replaced by 555 ...

    E-Print Network [OSTI]

    2012-10-30T23:59:59.000Z

    1 (blue. The orange problem is the same with 999 replaced by 555). (a) Number of solutions (999+2. 2. ) Number of solutions with x = y = z. 1. (x = y = z = 333).

  1. Variation in joint fluid composition and its effect on the tribology of replacement joint articulation

    E-Print Network [OSTI]

    Mazzucco, Daniel Clarke, 1976-

    2003-01-01T23:59:59.000Z

    Polyethylene wear is a significant clinical problem limiting the long-term survival of joint replacement prostheses, particularly in total hip arthroplasty (THA) and total knee arthroplasty (TKA). Although the tribology ...

  2. Development of a low fat wheat tortilla: optimization of lipids, emulsifiers, and fat replacers

    E-Print Network [OSTI]

    Dollak, Christina

    1993-01-01T23:59:59.000Z

    (DATEM). Finally, tortillas were made with commercially available, carbohydrate-based fat replacers: potato maltodextrins, tapioca maltodextrins, pregelatinized rice flour, modified rice solids, and pea starch. Dough water absorption, mixing time...

  3. Guideline for the seismic technical evaluation of replacement items for nuclear power plants

    SciTech Connect (OSTI)

    Harris, S.P.; Cushing, R.W. (EQE International, San Francisco, CA (United States)); Johnson, H.W. (Programmatic Solutions, Smithtown, NY (United States)); Abeles, J.M. (System 1, Inc., Potomac, MD (United States))

    1993-02-01T23:59:59.000Z

    Seismic qualification for equipment originally installed in nuclear power plants was typically performed by the original equipment suppliers or manufactures (OES/OEM). Many of the OES/OEM no longer maintain quality assurance programs with adequate controls for supplying nuclear equipment. Utilities themselves must provide reasonable assurance in the continued seismic adequacy of such replacement items. This guideline provides practical, cost-effective techniques which can be used to provide reasonable assurance that replacement items will meet seismic performance requirements necessary to maintain the seismic design basis of commercial nuclear power plants. It also provides a method for determining when a seismic technical evaluation of replacement items (STERI) is required as part of the procurement process for spare and replacement items. Guidance on supplier program requirements necessary to maintain continued seismic adequacy and on documentation of maintaining required seismic adequacy is also included.

  4. Better Buildings Alliance, adidas Case Study: adidas Saves Energy and Costs with Planned RTU Replacement Program (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-09-01T23:59:59.000Z

    Case study describing how adidas implemented a best practice of a planned replacement program for its RTUs.

  5. Innovative Approach to Chiller Replacement at Lafayette General Medical Center Located in Lafayette, Louisiana 

    E-Print Network [OSTI]

    Poche', J. M.; Broussard, J. P.

    1998-01-01T23:59:59.000Z

    converted to a gas-fired chiller in their chiller replacement program The analysis phase also included negotiating rates with the electric and gas companies servicing the Hospital. The utility history and equipment inventory was pesformed utilizing a...INNOVATIVE APPROACH TO CHILLER REPLACEMENT AT LAFAYETl'E GENERAL MEDICAL CENTER LOCATED IN LAFAYElTE, LOUISIANA James M. Pocbe*, P.E Mechanical EngineerIPresident Poche* Associates, Ltd. ABSTRACI' The rafavette General Medical Center is a 332...

  6. Manhattan Project | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Manhattan Project Manhattan Project Manhattan Project New Manhattan Project Interactive Website The Department of Energy traces its origins to World War II and the Manhattan...

  7. Image Based Face Replacement in Video Yu Liang ( ), Bing-Yu Chen ( ), Yung-Yu Chuang ( ), Ming Ouhyoung ( )

    E-Print Network [OSTI]

    Ouhyoung, Ming

    Image Based Face Replacement in Video Yu Liang ( ), Bing-Yu Chen ( ), Yung-Yu Chuang ( ), Ming In this paper, we present a practical and complete system for plausible face replacement of videos. In our system, we take two videos as inputs, and aim to replace the target human subject's face with an- other

  8. CAGE TRIALS USING AN ENDOGENOUS MEIOTIC DRIVE GENE IN THE MOSQUITO AEDES AEGYPTI TO PROMOTE POPULATION REPLACEMENT

    E-Print Network [OSTI]

    Severson, David

    POPULATION REPLACEMENT SUNG-JAE CHA, AKIO MORI, DAVE D. CHADEE, AND DAVID W. SEVERSON* Center for Tropical, West Indies Abstract. Control of arthropod-borne diseases based on population replacement into natural populations. Endogenous meiotic drive systems have strong and stable population replacement

  9. IEEE/ACM TRANSACTIONS ON NETWORKING, VOL. 10, NO. 4, AUGUST 2002 441 Efficient Randomized Web-Cache Replacement

    E-Print Network [OSTI]

    -Cache Replacement Schemes Using Samples From Past Eviction Times Konstantinos Psounis, Student Member, IEEE, and Balaji Prabhakar, Member, IEEE Abstract--The problem of document replacement in web caches has received much attention in recent research, and it has been shown that the eviction rule "replace the least

  10. 0-7803-7016-3/01/$10.00 2001 IEEE A Randomized Web-Cache Replacement Scheme

    E-Print Network [OSTI]

    Prabhakar, Balaji

    0-7803-7016-3/01/$10.00 ©2001 IEEE A Randomized Web-Cache Replacement Scheme Konstantinos Psounis@isl.stanford.edu Abstract-- The problem of document replacement in web caches has received much attention in recent research, and it has been shown that the eviction rule "replace the least recently used document" performs poorly

  11. Title: Optimal Replacement in the Proportional Hazards Model with semi-Markovian Covariate Process and Continuous Monitoring

    E-Print Network [OSTI]

    Ryan, Sarah M.

    1 Title: Optimal Replacement in the Proportional Hazards Model with semi-Markovian Covariate Process and Continuous Monitoring Index terms--Optimal replacement, proportional hazards model, semi-Markov process, threshold replacement policy, sensitivity analysis SUMMARY This paper deals with the optimal

  12. Optimal Replacement Policies Under Environment-Driven Degradation M. Yasin Ulukus1 Jeffrey P. Kharoufeh2 Lisa M. Maillart3

    E-Print Network [OSTI]

    Kharoufeh, Jeffrey P.

    Optimal Replacement Policies Under Environment-Driven Degradation M. Yasin Ulukus1 Jeffrey P a stochastically degrading system using preventive and reactive replacements. The system's rate of degradation expected discounted cost of preventively and reactively replacing such a system over an infinite planning

  13. Improving Replacement Decisions in SetAssociative Caches Zhenlin Wang Kathryn S. McKinley Arnold L. Rosenberg

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    Improving Replacement Decisions in Set­Associative Caches Zhenlin Wang Kathryn S. McKinley Arnold L. Rosenberg Computer Science Department, University of Massachusetts, Amherst ABSTRACT Cache replacement policies play a key role in determining hit rates in set­associative caches. Cache replacement algorithms

  14. UNDERGRADUATE GRADE REPLACEMENT FORM (Applicable to All Students who Repeat an Approved Course During Fall 2010 and Beyond)

    E-Print Network [OSTI]

    Frank, Thomas D.

    UNDERGRADUATE GRADE REPLACEMENT FORM (Applicable to All Students who Repeat an Approved Course During Fall 2010 and Beyond) STUDENT'S NAME STUDENT'S COLLEGE STUDENT'S UIN Under the Grade Replacement Policy for a repeated course, I request permission to replace the grade in the course listed below. I

  15. A periodic inspection and replacement policy for systems subject to competing failure modes due to degradation and traumatic events

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    A periodic inspection and replacement policy for systems subject to competing failure modes due-making. A condition-based periodic inspection/replacement policy is developed and compared with a benchmark time- based block replacement policy. Numerical results show that it is indeed useful to follow closely

  16. An Eye for an Eye: A Single Camera Gaze-Replacement Method The Blavatnik School of Computer Science

    E-Print Network [OSTI]

    Wolf, Lior

    An Eye for an Eye: A Single Camera Gaze-Replacement Method Lior Wolf The Blavatnik School an effective so- lution to this problem that is based on replacing the eyes of the user. This replacement, when is asked to look straight at the camera. We store these frames,then track the eyes accurately in the video

  17. Abstract--Replacing open-heart surgical procedures with beating-heart interventions substantially decreases the trauma

    E-Print Network [OSTI]

    Dupont, Pierre

    Abstract-- Replacing open-heart surgical procedures with beating-heart interventions substantially on the beating heart is valve repair. To address this need, this paper proposes a tool for replacing mitral valve replacement and reduction of regurgitation was demonstrated in an ex-vivo heart simulator. I. INTRODUCTION UE

  18. MRIP Operations Team Projects (2012 Funded) Project Name Project Description Project Objectives

    E-Print Network [OSTI]

    MRIP Operations Team Projects (2012 Funded) Project Name Project Description Project Objectives vessel registries to conduct recreational catch and effort surveys. Develop a recreational fishing. Accuracy Funded 2012 Oregon Shore and EstuaryBoat Survey Design Review Develop a new or revised

  19. Advanced Engineering Environment FY09/10 pilot project.

    SciTech Connect (OSTI)

    Lamph, Jane Ann; Kiba, Grant W.; Pomplun, Alan R.; Dutra, Edward G.; Sego, Abraham L.

    2010-06-01T23:59:59.000Z

    The Advanced Engineering Environment (AEE) project identifies emerging engineering environment tools and assesses their value to Sandia National Laboratories and our partners in the Nuclear Security Enterprise (NSE) by testing them in our design environment. This project accomplished several pilot activities, including: the preliminary definition of an engineering bill of materials (BOM) based product structure in the Windchill PDMLink 9.0 application; an evaluation of Mentor Graphics Data Management System (DMS) application for electrical computer-aided design (ECAD) library administration; and implementation and documentation of a Windchill 9.1 application upgrade. The project also supported the migration of legacy data from existing corporate product lifecycle management systems into new classified and unclassified Windchill PDMLink 9.0 systems. The project included two infrastructure modernization efforts: the replacement of two aging AEE development servers for reliable platforms for ongoing AEE project work; and the replacement of four critical application and license servers that support design and engineering work at the Sandia National Laboratories/California site.

  20. Alternatives to Diesel Fuel in California - Fuel Cycle Energy and Emission Effects of Possible Replacements Due to the TAC Diesel Particulate Decision

    SciTech Connect (OSTI)

    Christopher L. Saraicks; Donald M. Rote; Frank Stodolsky; James J. Eberhardt

    2000-05-01T23:59:59.000Z

    Limitations on petroleum-based diesel fuel in California could occur pursuant to the 1998 declaration by California's Air Resources Board (CARB) that the particulate matter component of diesel exhaust is a carcinogen, therefore a toxic air contaminant (TAC) subject to the state's Proposition 65. It is the declared intention of CARB not to ban or restrict diesel fuel, per se, at this time. Assuming no total ban, Argonne National Laboratory (ANL) explored two feasible ''mid-course'' strategies, each of which results in some degree of (conventional) diesel displacement. In the first case, with substantial displacement of compression ignition by spark ignition engines, diesel fuel is assumed admissible for ignition assistance as a pilot fuel in natural gas (NG)-powered heavy-duty vehicles. Gasoline demand in California increases by 32.2 million liters (8.5 million gallons) per day overall, about 21 percent above projected 2010 baseline demand. Natural gas demand increases by 13.6 million diesel liter (3.6 million gallon) equivalents per day, about 7 percent above projected (total) consumption level. In the second case, ressionignition engines utilize substitutes for petroleum-based diesel having similar ignition and performance properties. For each case we estimated localized air emission plus generalized greenhouse gas and energy changes. Fuel replacement by di-methyl ether yields the greatest overall reduction in NOx emissions, though all scenarios bring about PM10 reductions relative to the 2010 baseline, with greatest reductions from the first case described above and the least from fuel replacement by Fischer-Tropsch synthetic diesel. Economic implications of vehicle and engine replacement were not formally evaluated.

  1. Standard Measurement and Verification Plan for Lighting Retrofit Projects for Buildings and Building Sites

    SciTech Connect (OSTI)

    Richman, Eric E.

    2012-10-31T23:59:59.000Z

    This document provides a framework for standard measurement and verification (M&V) of lighting retrofit and replacement projects. It was developed to provide site owners, contractors, and other involved organizations with the essential elements of a robust M&V plan for lighting projects. It includes details on all aspects of effectively measuring light levels of existing and post-retrofit projects, conducting power measurement, and developing cost-effectiveness analysis. This framework M&V plan also enables consistent comparison among similar lighting projects, and may be used to develop M&V plans for non--lighting-technology retrofits and new installations.

  2. Evaluation of Arctic sea ice thickness simulated by Arctic Ocean Model Intercomparison Project models

    E-Print Network [OSTI]

    Zhang, Jinlun

    of fast ice formation and growth. Instead, the modeled fast ice is replaced with pack ice which driftsEvaluation of Arctic sea ice thickness simulated by Arctic Ocean Model Intercomparison Project with estimates of sea ice thickness derived from pan-Arctic satellite freeboard measurements (2004

  3. Hydrogen Storage The goal of this project is to develop the metrologies necessary

    E-Print Network [OSTI]

    Hydrogen Storage METALS The goal of this project is to develop the metrologies necessary for rapid, high-throughput measurement of the hydrogen content of novel materials proposed for hydrogen storage to the research community. Objective Impact and Customers · Hydrogen is promoted as a petroleum replacement

  4. Senior projectS corporate Sponsored

    E-Print Network [OSTI]

    Stuart, Josh

    --Professor, Computer Engineering | http://users.soe.ucsc. edu/~larrabee/Site/Professor_Tracy_Larrabee.html Charlie McSenior projectS program corporate Sponsored Partner's Day May 31, 2012 Baskin School of Engineering earning their engineering degree and fulfilling this capstone design sequence. Our students who have

  5. Livingston Campus Geothermal Project The Project

    E-Print Network [OSTI]

    Delgado, Mauricio

    Livingston Campus Geothermal Project The Project: Geothermal power is a cost effective, reliable is a Closed Loop Geothermal System involving the removal and storage of approximately four feet of dirt from the entire Geothermal Field and the boring of 321 vertical holes reaching a depth of 500 feet. These holes

  6. Tritium Facilities Modernization and Consolidation Project Process Waste Assessment (Project S-7726)

    SciTech Connect (OSTI)

    Hsu, R.H. [Westinghouse Savannah River Company, AIKEN, SC (United States); Oji, L.N.

    1997-11-14T23:59:59.000Z

    Under the Tritium Facility Modernization {ampersand} Consolidation (TFM{ampersand}C) Project (S-7726) at the Savannah River Site (SS), all tritium processing operations in Building 232-H, with the exception of extraction and obsolete/abandoned systems, will be reestablished in Building 233-H. These operations include hydrogen isotopic separation, loading and unloading of tritium shipping and storage containers, tritium recovery from zeolite beds, and stripping of nitrogen flush gas to remove tritium prior to stack discharge. The scope of the TFM{ampersand}C Project also provides for a new replacement R&D tritium test manifold in 233-H, upgrading of the 233- H Purge Stripper and 233-H/234-H building HVAC, a new 234-H motor control center equipment building and relocating 232-H Materials Test Facility metallurgical laboratories (met labs), flow tester and life storage program environment chambers to 234-H.

  7. Information Technology Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-03T23:59:59.000Z

    The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1, dated 1-16-2013, cancels DOE O 415.1.

  8. The 4-H Project

    E-Print Network [OSTI]

    Howard, Jeff W.

    2005-05-10T23:59:59.000Z

    As a 4-H volunteer, you will find that projects are useful tools for teaching a wide variety of skills to young people. This publication will help you plan and evaluate 4-H learning projects....

  9. Information Technology Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-03T23:59:59.000Z

    The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

  10. CX-012632: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    LURR 20140456 - Salmon Creek Avenue Pathway Project CX(s) Applied: B4.9Date: 41885 Location(s): WashingtonOffices(s): Bonneville Power Administration

  11. CX-009005: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Henderson Solar Energy Project CX(s) Applied: B5.16 Date: 08/22/2012 Location(s): Nevada Offices(s): Golden Field Office

  12. CX-012474: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Refractories/Ceramics Project CX(s) Applied: B3.6Date: 41870 Location(s): OregonOffices(s): National Energy Technology Laboratory

  13. CX-008797: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Coal Pile Basin Project CX(s) Applied: B1.29 Date: 06/04/2012 Location(s): Tennessee Offices(s): Y-12 Site Office

  14. CX-010590: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Kalispell Shunt Cap Addition Project CX(s) Applied: B4.11 Date: 07/01/2013 Location(s): Montana Offices(s): Bonneville Power Administration

  15. Categorical Exclusion Determinations: Western Area PowerAdministratio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Center October 26, 2009 CX-005544: Categorical Exclusion Determination Power Rate Formula for the Provo River Project of the Western Area Power Administration CX(s) Applied:...

  16. CX-008684: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Metaline Radio Station Upgrade Project CX(s) Applied: B1.19 Date: 07/11/2012 Location(s): Washington Offices(s): Bonneville Power Administration

  17. CX-008215: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Small Hydropower Research and Development Technology Project CX(s) Applied: A9 Date: 04/03/2012 Location(s): Colorado Offices(s): Golden Field Office

  18. CX-011391: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exclusion Determination CX-011391: Categorical Exclusion Determination Municipal Complex Solar Power Project CX(s) Applied: B3.14 Date: 12102013 Location(s): New Jersey...

  19. CX-007111: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-007111: Categorical Exclusion Determination Shallow Carbon Sequestration Demonstration Project (Iatan Generating Station) CX(s) Applied: B3.1...

  20. CX-007118: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-007118: Categorical Exclusion Determination Shallow Carbon Sequestration Demonstration Project CX(s) Applied: B3.1 Date: 10042011...

  1. CX-007388: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exclusion Determination CX-007388: Categorical Exclusion Determination Regional Test Center Project: Solar Technology Acceleration Center (SolarTAC) CX(s) Applied: B1.15,...

  2. CX-008235: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exclusion Determination CX-008235: Categorical Exclusion Determination Harnessing the Hydro-Electric Potential of Engineered Drops in the Columbia Basin Project: Phase 1 CX(s)...

  3. CX-003904: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    904: Categorical Exclusion Determination CX-003904: Categorical Exclusion Determination Hydro Electric Project - Snohomish Public Utility District CX(s) Applied: A9, A11, B5.1...

  4. CX-009542: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Solar Parks Project CX(s) Applied: B5.16 Date: 11/09/2012 Location(s): Florida Offices(s): Golden Field Office

  5. CX-003403: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    CX-003403: Categorical Exclusion Determination The Snake River Geothermal Drilling Project - Innovative Approaches to Geothermal Exploration CX(s) Applied: A9, B3.7...

  6. CX-002745: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    CX-002745: Categorical Exclusion Determination The Snake River Geothermal Drilling Project - Innovative Approaches to Geothermal Exploration CX(s) Applied: B3.1, A9...

  7. CX-003208: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-003208: Categorical Exclusion Determination Michigan 85% Ethanol Fuel (E85) Infrastructure Project CX(s) Applied: B5.1 Date: 08032010 Location(s):...

  8. CX-003471: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-003471: Categorical Exclusion Determination Pennsylvania Ethanol Fuel (E85) Corridor Project - Lew's Service Center CX(s) Applied: B5.1 Date: 0823...

  9. CX-011131: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Puget Sound Pilot Tidal Energy Project CX(s) Applied: A9 Date: 08/13/2013 Location(s): Washington Offices(s): Golden Field Office

  10. CX-007358: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination Integration of the University of Oregon's Cogeneration Project CX(s) Applied: B1.7 Date: 12012011 Location(s): Oregon Offices(s):...

  11. CX-001403: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-001403: Categorical Exclusion Determination West New York Energy Efficiency Projects CX(s) Applied: B5.1 Date: 04092010 Location(s): West New...

  12. CX-009210: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Silver Butte Fiber Burial Project CX(s) Applied: B.47 Date: 08/28/2012 Location(s): Montana, Montana Offices(s): Bonneville Power Administration

  13. CX-012117: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exclusion Determination CX-012117: Categorical Exclusion Determination Fuel Cell Hybrid Walk-In Van Deployment Project CX(s) Applied: A9 Date: 05212014 Location(s):...

  14. CX-007517: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    UPF Mock Wall Project CX(s) Applied: B3.6 Date: 11/29/2011 Location(s): Tennessee Offices(s): Y-12 Site Office

  15. CX-004085: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination Project T-221, Hazardous Material Management and Emergency Response (HAMMER) Operations Building CX(s) Applied: B1.15 Date: 10082010 Location(s): Richmond,...

  16. CX-100018: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Determination Wind Generator Project CX(s) Applied: A9 Date: 08152014 Location(s): Michigan Offices(s): Golden Field Office Technology Office: Wind Program Award Number:...

  17. CX-000653: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination CX-000653: Categorical Exclusion Determination Helios - Project: Photovoltaic Crystalline Module Assembly Plant CX(s) Applied: B5.1 Date: 01272010 Location(s):...

  18. CX-002945: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Exclusion Determination CX-002945: Categorical Exclusion Determination Pennsylvania Green Energy Works Targeted Grant - Native Energy Biogas Project CX(s) Applied: B1.15,...

  19. CX-004376: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination City of Woodward, Oklahoma Ground Source Heat Pump Project Beyond State Template CX(s) Applied: B5.1 Date: 11012010 Location(s):...

  20. CX-008571: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Project Blue Energy CX(s) Applied: A9 Date: 06/20/2012 Location(s): Utah Offices(s): Golden Field Office

  1. CX-000998: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination CX-000998: Categorical Exclusion Determination Biodiesel Infrastructure Project (Coulee) CX(s) Applied: A1, A9, B5.1 Date: 01272010...

  2. CX-000712: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Categorical Exclusion Determination CX-000712: Categorical Exclusion Determination Biodiesel Infrastructure Project (Coulee) CX(s) Applied: A1, A9, B5.1 Date: 01272010...

  3. CX-006500: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Determination CX-006500: Categorical Exclusion Determination Magellan Des Moines Biodiesel Terminal Project CX(s) Applied: B5.1 Date: 09062011 Location(s): Des Moines, Iowa...

  4. CX-008588: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    St. Petersburg Solar Pilot Project CX(s) Applied: B5.1 Date: 07/19/2012 Location(s): Florida Offices(s): Golden Field Office

  5. CX-002698: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    98: Categorical Exclusion Determination CX-002698: Categorical Exclusion Determination Seismic Testing (Under Task 5 of Statement of Project Objectives) CX(s) Applied: B3.1 Date:...

  6. CX-012097: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Microgrid Demonstration Project CX(s) Applied: B5.15 Date: 03/24/2014 Location(s): Idaho Offices(s): Idaho Operations Office

  7. CX-008624: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Abandonment of the Western Sector Dynamic Underground Stripping (DUS) Project Steam Injection Wells CX(s) Applied: B3.1 Date: 06202012 Location(s): South Carolina...

  8. CX-005076: Categorical Exclusion Determination | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    CX-005076: Categorical Exclusion Determination Jefferson County Sheriff's Department Propane Infrastructure Project CX(s) Applied: B5.1 Date: 01272011 Location(s): Jefferson,...

  9. CX-012122: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    OCGen Module Mooring Project CX(s) Applied: B5.25 Date: 04/29/2014 Location(s): Maine Offices(s): Golden Field Office

  10. GHPsRUS Project

    SciTech Connect (OSTI)

    Battocletti, Liz

    2013-07-09T23:59:59.000Z

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  11. GHPsRUS Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Battocletti, Liz

    The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

  12. WIPP Projects Interative Map

    Broader source: Energy.gov [DOE]

    View WIPP Projects in a larger map. To report corrections, please email WeatherizationInnovation@ee.doe.gov.

  13. Bacteria TMDL Projects 

    E-Print Network [OSTI]

    Wythe, Kathy

    2007-01-01T23:59:59.000Z

    of the projects are listed below. ? Peach CreekWater Quality Improvement Project ? Monitoring and Educational Programs Focused on Bacteria and Nutrient Runoff on Dairy Operations in the LeonWatershed ? Development of the Plum CreekWPP ? Impact of Proper... Star Healthy Streams * ? Environmental Management of Grazing Lands * *TWRI-managed projects More information on the initiative is available at www.tsswcb.state.tx.us/managementprogram/ initiatives/bacteria. Bacteria Projects Across the State...

  14. Monitoring and evaluation of replacing low-efficiency air conditioners with high-efficiency air conditioners in single-family detached houses in Austin, Texas

    SciTech Connect (OSTI)

    Burns, R.; Hough, R.E. (Fleming (W.S.) and Associates, Inc., Syracuse, NY (United States))

    1991-10-01T23:59:59.000Z

    The US DOE initiated this project to evaluate the performance of an air conditioner retrofit program in Austin, Texas. The City's Austin's Resource Management Department pursued this project to quantify the retrofit effect of replacing low-efficiency air conditioners with high-efficiency air conditioners in single-family detached homes. If successfully implemented, this retrofit program could help defer construction of a new power plant which is a major goal of this department. The project compares data collected from 12 houses during two cooling seasons under pre-retrofit and then post-retrofit air conditioner units. The existing low-efficiency air conditioners were monitored during the 1987 cooling season, replaced during the 1987--88 heating season with new, smaller sized, high-efficiency units, and then monitored again during the 1988 cooling season. Results indicated that the air conditioner retrofits reduce the annual air conditioner electric consumption and peak electric demand by an average of 38%. When normalized to the nominal capacity of the air conditioner, average demand savings were 1.12 W/ft{sup 2} and estimated annual energy savings were 1.419 kWh/ft{sup 2}. Individual air conditioner power requirements were found to be a well defined function of outdoor temperature as expected. In the absence of detailed data, estimates of the peak demand reductions of new air conditioners can be made from the manufacturer's specifications. Air conditioner energy consumption proved to be strongly linear as a function of the outdoor temperature as expected when taken as an aggregate. No noticeable differences in the diversity factor of the air conditioner usage were found. Analysis of the retrofit effect using PRISM yields estimates of the reduction in normalized annual consumption (NAC) and annual cooling consumption of 12% and 30%. 2 refs., 11 figs., 17 tabs.

  15. Kansas Advanced Semiconductor Project

    SciTech Connect (OSTI)

    Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

    2007-09-21T23:59:59.000Z

    KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

  16. Product Guide Project Standard and Project Professional

    E-Print Network [OSTI]

    Narasayya, Vivek

    ................................................................................................................................................................6 Manage Projects and Programs, or other intellectual property that are the subject matter of this document. #12;Table of Contents .......................................................................................................9 Make It Yours ­ Personalize the Ribbon

  17. Fuel Cell Forklift Project Final Report

    SciTech Connect (OSTI)

    Cummings, Clifton C

    2013-10-23T23:59:59.000Z

    This project addresses the DOE’s priorities related to acquiring data from real-world fuel cell operation, eliminating non-technical barriers, and increasing opportunities for market expansion of hydrogen fuel cell technologies. The project involves replacing the batteries in a complete fleet of class-1 electric lift trucks at FedEx Freight’s Springfield, MO parcel distribution center with 35 Plug Power GenDrive fuel cell power units. Fuel for the power units involves on-site hydrogen handling and dispensing equipment and liquid hydrogen delivery by Air Products. The project builds on FedEx Freight’s previous field trial experience with a handful of Plug Power’s GenDrive power units. Those trials demonstrated productivity gains and improved performance compared to battery-powered lift trucks. Full lift truck conversion at our Springfield location allows us to improve the competitiveness of our operations and helps the environment by reducing greenhouse gas emissions and toxic battery material use. Success at this distribution center may lead to further fleet conversions at some of our distribution centers.

  18. Advanced Blade Manufacturing Project - Final Report

    SciTech Connect (OSTI)

    POORE, ROBERT Z.

    1999-08-01T23:59:59.000Z

    The original scope of the project was to research improvements to the processes and materials used in the manufacture of wood-epoxy blades, conduct tests to qualify any new material or processes for use in blade design and subsequently build and test six blades using the improved processes and materials. In particular, ABM was interested in reducing blade cost and improving quality. In addition, ABM needed to find a replacement material for the mature Douglas fir used in the manufacturing process. The use of mature Douglas fir is commercially unacceptable because of its limited supply and environmental concerns associated with the use of mature timber. Unfortunately, the bankruptcy of FloWind in June 1997 and a dramatic reduction in AWT sales made it impossible for ABM to complete the full scope of work. However, sufficient research and testing were completed to identify several promising changes in the blade manufacturing process and develop a preliminary design incorporating these changes.

  19. A Study of the Key Variables Affecting Bus Replacement Age Decisions and1 Total Costs2

    E-Print Network [OSTI]

    Bertini, Robert L.

    A Study of the Key Variables Affecting Bus Replacement Age Decisions and1 Total Costs2 3 Jesse operational3 and maintenance (O&M) per-mile costs increase as buses age. From a purely economic4 perspective, there is a cost tradeoff between the lower O&M costs of newer fleets and their5 higher initial capital costs

  20. Analysis of the Repair vs. Replace Decision for Small AC Motors

    E-Print Network [OSTI]

    Chamberlain, P. F.

    1984-01-01T23:59:59.000Z

    This morning in the course of my discussion, I would like to cover how we at Westvaco were handling our motor replacement decisions, how we are handling them now and how we determined the costs and benefits of such a change. As you have already...

  1. Principles and Efficient Implementation of Charge Replacement in Hybrid Electrical Energy Storage

    E-Print Network [OSTI]

    Pedram, Massoud

    1 Principles and Efficient Implementation of Charge Replacement in Hybrid Electrical Energy Storage--Hybrid electrical energy storage systems (HEES) are comprised of multiple banks of inhomogeneous EES elements storage device, i.e., high energy capacity, high output power level, low self-discharge, low cost

  2. The feasibility of replacing or upgrading utility distribution transformers during routine maintenance

    SciTech Connect (OSTI)

    Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

    1995-04-01T23:59:59.000Z

    It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

  3. II MODEL AND FEEDBACK LINEARIZING CONTROLLER 1 A Multilayer Perceptron Replaces a Feedback

    E-Print Network [OSTI]

    Amaral, José Nelson

    II MODEL AND FEEDBACK LINEARIZING CONTROLLER 1 A Multilayer Perceptron Replaces a Feedback Linearization Controller in a Nonlinear Servomechanism Jos'e F. Haffner, Ney T. Meyrer, Jos'e N. Amaral and Lu'is F. A. Pereira Abstract--- A Feedback Linearizing Controller (FLC) is used to train a multilayer

  4. Managing Inventory of Items with Replacement Wei Huang Vidhyadhar Kulkarni 1

    E-Print Network [OSTI]

    Kulkarni, Vidyadhar G.

    Managing Inventory of Items with Replacement Warranty Wei Huang Vidhyadhar Kulkarni 1 Jayashankar items under warranty. We model this setting as a multi-period single product inventory problem where that neglects warranty repairs. Keyword: Warranty, Inventory, Stochastic Demand, Information. 1 This work

  5. Conformationally constrained farnesoid X receptor (FXR) agonists: Heteroaryl replacements of the naphthalene

    SciTech Connect (OSTI)

    Bass, Jonathan Y.; Caravella, Justin A.; Chen, Lihong; Creech, Katrina L.; Deaton, David N.; Madauss, Kevin P.; Marr, Harry B.; McFadyen, Robert B.; Miller, Aaron B.; Mills, Wendy Y.; Navas, III, Frank; Parks, Derek J.; Smalley, Jr., Terrence L.; Spearing, Paul K.; Todd, Dan; Williams, Shawn P.; Wisely, G. Bruce (GSKNC)

    2014-08-13T23:59:59.000Z

    To improve on the drug properties of GSK8062 1b, a series of heteroaryl bicyclic naphthalene replacements were prepared. The quinoline 1c was an equipotent FXR agonist with improved drug developability parameters relative to 1b. In addition, analog 1c lowered body weight gain and serum glucose in a DIO mouse model of diabetes.

  6. CONTRIBUTED ARTICLE 117. Use of in situ Fiber-Optic Raman Spectroscopy to Replace

    E-Print Network [OSTI]

    Myrick, Michael Lenn

    CONTRIBUTED ARTICLE 117. Use of in situ Fiber-Optic Raman Spectroscopy to Replace Calorimetry. Abstract A method for real time determination of the percent cure of epoxies via in-situ fiber-optic Raman to be reliable to +/- 0.82% in the 40-90% cure range. Key words: Process monitoring, fiber optic, Raman

  7. IDD Ingest Relay Replacement in Support of the THREDDS/RAMADDA Server System at Penn State

    E-Print Network [OSTI]

    IDD Ingest Relay Replacement in Support of the THREDDS/RAMADDA Server System at Penn State Final/RAMADDA data provider since 2011. Recently, the equipment providing our IDD relay service (3 servers with Intel-processor Xeon E5606 2.13 GHz 64-bit machines running the LDM and Linux Virtual Server (LVS) in a virtual machine

  8. Review, reduce, and replace: The three `R's of energy security Larry Hughes

    E-Print Network [OSTI]

    Hughes, Larry

    ERG2007/01 Review, reduce, and replace: The three `R's of energy security Larry Hughes Energy: The three `R's of energy security 1 Abstract Rising world energy costs, increasing demand for energy contributed to national and international concerns over energy security. If a jurisdiction's energy security

  9. Reduced Energy and Maintenance Costs Using Polyurethane as a Replacement Roof System

    E-Print Network [OSTI]

    Scott, G. D.

    failures had occurred and resealing and reflashing penetrations. In many instances roof crews were unable to accomplish a permanent fix without a major tear-off and replacement of the existing roof. 40 ESL-HH-92-05-08 Proceedings of the Eighth...

  10. Replacement strategies to preserve useful diversity in steady-state genetic algorithms

    E-Print Network [OSTI]

    Granada, Universidad de

    as a serious failure mode for GAs [13,17]. Selective pressure and population diversity are inversely related]. Steady-state GAs (SSGAs) [42,49] usually only produce one or two offspring in each generation. Parents on generational GAs (which replace the entire population by the offspring population every generation) is because

  11. PRECAST REPLACEMENT OF CONCRETE PAVEMENT SLABS (Tollway) Effective: March 30, 2009

    E-Print Network [OSTI]

    PRECAST REPLACEMENT OF CONCRETE PAVEMENT SLABS (Tollway) Effective: March 30, 2009 Revised: October 19, 2012 DESCRIPTION. This work shall consist of the removal of existing concrete pavement, restoration of the subbase material, the installation of precast concrete pavement slabs in accordance

  12. [Minor revisionposted 12/6/12 (replaces 10/6/10 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    of this Operating Policy/Procedure (OP) is to establish a standard procedure for controlled access, securityOP 61.07 [Minor revision­posted 12/6/12 (replaces 10/6/10 edition)] Operating Policy and Procedure employees required to perform operational #12;December 6, 2012 Page 2 OP 61.07 checks and maintenance

  13. [Minor revisionposted 5/19/14 (replaces 1/27/11 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    of this Operating Policy/Procedure (OP) is to establish standards for traffic and parking control devices to ensureOP 61.18 [Minor revision­posted 5/19/14 (replaces 1/27/11 edition)] Operating Policy and Procedure of Grounds Maintenance by August 1 of every year." b. The assistant vice president for operations

  14. [Minor revisionposted 12/7/12 (replaces 2/18/11 edition)] Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    of this Operating Policy/Procedure (OP) is to establish standards and guidelines for the use and selectionOP 61.14 [Minor revision­posted 12/7/12 (replaces 2/18/11 edition)] Operating Policy and Procedure and issuance of keys, development of keying systems, standardization of hardware, and maintenance programs

  15. The Replacement Operation for CCP Programs Marco Bertolino 1 , Sandro Etalle 2 , and Catuscia Palamidessi 3

    E-Print Network [OSTI]

    Palamidessi, Catuscia

    University catuscia@cse.psu.edu Abstract. The replacement is a very powerful transformation opera­ tion which common transformation operations such as unfold, fold, switching, distribution. Because of optimization techniques. To this end, while there exists a history and a wide literature on transformations

  16. Towards Reliable Scheduling Schemes for Long-lived Replaceable Sensor Networks

    E-Print Network [OSTI]

    Wang, Guiling

    . For example, the amount of energy that a solar cell can harvest is proportional to its surface area, but it is infeasible to equip a tiny sensor node with a large-size solar cell, besides the amount of available solar in realizing the strategy is how to minimize the system maintenance cost, especially the frequency in replacing

  17. Node-Replacement Policies to Maintain Threshold-Coverage in Wireless Sensor Networks

    E-Print Network [OSTI]

    Vokkarane, Vinod M.

    1 Node-Replacement Policies to Maintain Threshold-Coverage in Wireless Sensor Networks Sachin consider the problem of maintaining a minimum threshold-coverage in a wireless sensor network, while to maintain threshold-coverage in wireless sensor networks. These policies assess the candidature of each

  18. Reliability of Nano-Structured Nickel Interconnections Replacing FlipChip Solder Assembly without Underfill

    E-Print Network [OSTI]

    Swaminathan, Madhavan

    Reliability of Nano-Structured Nickel Interconnections Replacing FlipChip Solder Assembly without nano-structured nickel as the primary interconnection material. Assembly was accomplished materials such as nanostructured copper and nickel, novel bonding and barrier layers to provide both

  19. Roof Replacement and Related Work February 17, 2000 DSR # 0000-00 XXX

    E-Print Network [OSTI]

    Roof Replacement and Related Work February 17, 2000 DSR # 0000-00 XXX SECTION 02072 - REMOVAL OF INTACT INCIDENTAL ASBESTOS CONTAINING ROOFING MATERIAL (Rev.9/00) PART 1 - GENERAL 1.1 RELATED DOCUMENTS Roof System Components Chart" for location of asbestos containing roofing materials. 1.2 SUMMARY A

  20. Properties of potential eco-friendly gas replacements for particle detectors in high-energy physics

    E-Print Network [OSTI]

    Benussi, L; Piccolo, D; Saviano, G; Colafranceschi, S; Kjřlbro, J; Sharma, A; Yang, D; Chen, G; Ban, Y; Li, Q

    2015-01-01T23:59:59.000Z

    Modern gas detectors for detection of particles require F-based gases for optimal performance. Recent regulations demand the use of environmentally unfriendly F-based gases to be limited or banned. This review studies properties of potential eco-friendly gas candidate replacements.

  1. Properties of potential eco-friendly gas replacements for particle detectors in high-energy physics

    E-Print Network [OSTI]

    Benussi, L; Piccolo, D; Saviano, G; Colafranceschi, S; Kjřlbro, J; Yang, D; Chen, G; Ban, Y; Li, Q; Sharma, A

    2015-01-01T23:59:59.000Z

    Modern gas detectors for detection of particles require F-based gases for op- timal performance. Recent regulations demand the use of environmentally un- friendly Freon-based gases to be limited or banned. This review studies properties of potential eco-friendly gas candidate replacements.

  2. 5/8/2014 Page 1 Fill a Temporary Position to Replace an Employee on Leave

    E-Print Network [OSTI]

    Habib, Ayman

    of the replacement is greater than 6 months, enter 006 ­ Tempoary Relief. Enter the Length of Term which Positioned Job ­ No Change. Enter Position Information 3. Enter the Position Number of the role you are looking to fill NOTE! If you do not know the Position Number, you can use the Look Up button and search

  3. Measure Guideline: Replacing Single-Speed Pool Pumps with Variable Speed Pumps for Energy Savings

    SciTech Connect (OSTI)

    Hunt, A.; Easley, S.

    2012-05-01T23:59:59.000Z

    The report evaluates potential energy savings by replacing traditional single-speed pool pumps with variable speed pool pumps, and provide a basic cost comparison between continued uses of traditional pumps verses new pumps. A simple step-by-step process for inspecting the pool area and installing a new pool pump follows.

  4. GREEN LIVING Replace incandencent and halogen light bulbs with LED and CLFs

    E-Print Network [OSTI]

    Thaxton, Christopher S.

    GREEN LIVING GUIDE ENERGY TRAVEL FOOD sustain yosef WATER Replace incandencent and halogen light for your laundry RESIST THAT SWITCH! Use natural light during the day, and no lights when you are gone USE MORE THAN YOU CAN EAT, reduce your waste stream DRINK FAIR TRADE COFFEE - Check out Conrad

  5. Survival of Bundleless Hair Cells and Subsequent Bundle Replacement in the Bullfrog's Saccule

    E-Print Network [OSTI]

    Survival of Bundleless Hair Cells and Subsequent Bundle Replacement in the Bullfrog's Saccule and balance depend upon hair cells, the sensory receptors of the inner ear. Millions of people suffer from hearing and balance deficits caused by damage to hair cells as a result of exposure to noise

  6. Development/Plasticity/Repair Hair Cell Replacement in Adult Mouse Utricles after

    E-Print Network [OSTI]

    Rubel, Edwin

    Development/Plasticity/Repair Hair Cell Replacement in Adult Mouse Utricles after Targeted Ablation of Hair Cells with Diphtheria Toxin Justin S. Golub,1 Ling Tong,1 Tot B. Ngyuen,1 Cliff R. Hume,1 Richard developed a transgenic mouse to permit conditional and selective ablation of hair cells in the adult mouse

  7. Project management plan for Project W-178, 219-S secondary containment

    SciTech Connect (OSTI)

    Buckles, D.I.

    1995-01-26T23:59:59.000Z

    This Project Management Plan (PMP) establishes the organizational responsibilities, control systems, and procedures for managing the execution of project activities for Project W-178, the 219-S Secondary Containment Upgrade. The scope of this project will provide the 219-S Facility with secondary containment for all tanks and piping systems. Tank 103 will be replaced with a new tank which will be designated as Tank 104. Corrosion protection shall be installed as required. The cells shall be cleaned and the surface repaired as required. The 219-S Waste Handling Facility (219-S Facility), located in the 200 West Area, was constructed in 1951 to support the 222-S Laboratory Facility. The 219-S Facility has three tanks, TK-101, TK-102, and TK-103, which receive and neutralize low level radioactive wastes from the 222-S Laboratory. For purposes of the laboratory, the different low level waste streams have been designated as high activity and intermediate activity. The 219-S Facility accumulates and treats the liquid waste prior to transferring it to SY Tank Farm in the 200-W Area. Transfers are normally made by pipeline from the 219-S Facility to the 241-SY Tank Farm. Presently transfers are being made by tanker truck to the 200-E Area Tank Farms due to the diversion box catch tank which has been removed from service.

  8. Parchment Replacement Form The parchment will be mailed out in a cardboard envelope to the address listed below after the form and payment have been received.

    E-Print Network [OSTI]

    Saskatchewan, University of

    Parchment Replacement Form The parchment will be mailed out in a cardboard envelope to the address listed below after the form and payment have been received. Note: The replacement diploma is produced with a replacement note on the reverse side. There is a fee of $50 for a replacement parchment. DELIVERY INSTRUCTIONS

  9. Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

    SciTech Connect (OSTI)

    Kosonen, M.; Hakola, M. [Teollisuuden Voima Oyj, F- 27160 Eurajoki (Finland)

    2012-07-01T23:59:59.000Z

    Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the efficiency of the plant units, and a power increase of nearly 20 MW was achieved at both plant units. PELE wonderfully manifests one of the strategic goals of our company; developing the competence of our in-house personnel by working in projects. (authors)

  10. PSNH's Northern Wood power project repowers coal-fired plant with new fluidized-bed combustor

    SciTech Connect (OSTI)

    Peltier, R.

    2007-08-15T23:59:59.000Z

    The Northern Wood Power project permanently replaced a 50-MW coal-burning boiler (Unit 5) at Public Service of New Hampshire's Schiller station with a state-of-the-art circulating fluidized bed wood-burning boiler of the same capacity. The project, completed in December 2006, reduced emissions and expanded the local market for low-grade wood. For planning and executing the multiyear, $75 million project at no cost to its ratepayers, PSNH wins Power's 2007 Marmaduke Award for excellence in O & M. The award is named for Marmaduke Surfaceblow, the fictional marine engineer/plant troubleshoot par excellence. 7 figs., 1 tab.

  11. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Fix, N. J.

    2008-11-30T23:59:59.000Z

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  12. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    SEEMAN, S.E.

    2000-04-01T23:59:59.000Z

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  13. Battleground Energy Recovery Project

    SciTech Connect (OSTI)

    Daniel Bullock

    2011-12-31T23:59:59.000Z

    In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and ď?· Create a Showcase Waste Heat Recovery Demonstration Project.

  14. IGCC repowering project clean coal II project public design report. Annual report, October 1992--September 1993

    SciTech Connect (OSTI)

    NONE

    1993-10-01T23:59:59.000Z

    Combustion Engineering, Inc. (CE) is participating in a $270 million coal gasification combined cycle repowering project that was designed to provide a nominal 60 MW of electricity to City, Water, Light and Power (CWL&P) in Springfield, Illinois. The Integrated Gasification Combined Cycle (IGCC) system consists of CE`s air-blown entrained flow two-stage gasifier; an advanced hot gas cleanup system; a combustion turbine adapted to use low-BTU gas; and all necessary coal handling equipment, The project is currently completing the second budget period of five. The major activities to date are: (1) Establishment of a design, cost, and schedule for the project; (2) Establishment of financial commitments; (3) Acquire design and modeling data; (4) Establishment of an approved for design (AFD) engineering package; (5) Development of a detailed cost estimate; (6) Resolution of project business issues; (7) CWL&P renewal and replacement activities; and (8) Application for environmental air permits. A Project Management Plan was generated, The conceptual design of the plant was completed and a cost and schedule baseline for the project was established in Budget Period One. This information was used to establish AFD Process Flow Diagrams, Piping and Instrument Diagrams, Equipment Data Sheets, material take offs, site modification plans and other information necessary to develop a plus or minus 20% cost estimate. Environmental permitting activities were accomplished, including the Air Permit Application, completion of the National Environmental Policy Act process, and the draft Environmental Monitoring Plan. At the end of 1992 the DOE requested that Duke Engineering and Services Inc., (DESI) be used to complete the balance of plant cost estimate. DESI was retained to do this work, DESI completed the material take off estimate and included operations, maintenance, and startup in the estimate.

  15. Operational Waste Volume Projection

    SciTech Connect (OSTI)

    STRODE, J.N.

    1999-08-24T23:59:59.000Z

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2018 are projected based on assumption as of July 1999. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement.

  16. Operational Waste Volume Projection

    SciTech Connect (OSTI)

    STRODE, J.N.

    2000-08-28T23:59:59.000Z

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  17. Operational waste volume projection

    SciTech Connect (OSTI)

    Koreski, G.M.

    1996-09-20T23:59:59.000Z

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June 1996.

  18. Project: BELLA Bldg. #: 71

    E-Print Network [OSTI]

    TO CONSTRUCTION AS OF 10/4/2011 Current/Approved Projects Project: Solar Energy Research Center Bldg. #:TBD. #: TBD Affected Area: R1 Road & V Road (58) Dates: 8/2011 - 9/2013 6 Small Projects: A. B50 Electrical/1/2014 N3 (58) 42 11/1/2011 2/1/2014 M-1 (35) 12 10/1/2010 11/1/2011 B81 (21) 18 10/1/2010 11/1/2011 V Road

  19. 2015 Technology Innovation Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for RTU and Lighting Retrofits Energy Efficiency TIP 140: Energy Efficiency Emerging Technology Assessment and Demonstration Projects TIP 261: Determining and Improving the...

  20. Custom Renewable Energy Projects

    Broader source: Energy.gov [DOE]

    Project development assistance funding is available for a variety of purposes, including grant writing, feasibility studies, or technical assistance with design, permitting, or utility interconne...

  1. Mascoma: Frontier Biorefinery Project

    Broader source: Energy.gov [DOE]

    This project involves the construction and operation of a biorefinery that produces ethanol and other co-products from cellulosic materials through advanced consolidated bioprocessing.

  2. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    by FY12. 95% Line Item 85% Cleanup 97% Line Item 85% Cleanup EVM represents Earned Value Management. FY2011 Second Quarter Overall Contract and Project Management Improvement...

  3. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    by FY12. 95% Line Item 85% Cleanup 100% Line Item 88% Cleanup EVM represents Earned Value Management. FY2011 Fourth Quarter Overall Contract and Project Management Improvement...

  4. Contract/Project Management

    Energy Savers [EERE]

    by FY12. 95% Line Item 85% Cleanup 100% Line Item 88% Cleanup EVM represents Earned Value Management. FY2011 First Quarter Overall Contract and Project Management Performance...

  5. Contract/Project Management

    Energy Savers [EERE]

    by FY12. 95% Line Item 85% Cleanup 97% Line Item 89% Cleanup EVM represents Earned Value Management. FY2011 Third Quarter Overall Contract and Project Management Improvement...

  6. Recovery Act Project Stories

    Broader source: Energy.gov [DOE]

    Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies.

  7. Project Finance Case Studies

    Broader source: Energy.gov [DOE]

    Presentation covers the Project Finance Case Studies and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

  8. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    capital asset line item projects (less than 50 million) are fully funded in one Fiscal Year (one Appropriation). NA NA Policy memorandum drafted and in review 12. Cost...

  9. TThe {\\sc Majorana} Project

    E-Print Network [OSTI]

    The MAJORANA collaboration

    2009-10-23T23:59:59.000Z

    The {\\sc Majorana} Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

  10. The MAJORANA project

    SciTech Connect (OSTI)

    Elliott, Steven R [Los Alamos National Laboratory

    2009-01-01T23:59:59.000Z

    The Majorana Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

  11. Energy Markets and Projections

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Governors Association Governors' Advisors Energy Policy Institute July 24, 2014 | Washington, DC By Adam Sieminski, EIA Administrator Energy Markets and Projections NGA...

  12. Our Project Regional, community,

    E-Print Network [OSTI]

    Minnesota, University of

    City departments -City Engineering and Traffic Engineering Public engagement early in project process modes and all users See.Safe.Smart.Rochester campaign to decrease modal conflict Connection

  13. Barstow Wind Turbine Project

    Broader source: Energy.gov [DOE]

    Presentation covers the Barstow Wind Turbine project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

  14. Prison Solar Project

    Broader source: Energy.gov [DOE]

    Presentation covers the Prison Solar Project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

  15. Data Collection for Current U.S. Wind Energy Projects: Component Costs, Financing, Operations, and Maintenance; January 2011 - September 2011

    SciTech Connect (OSTI)

    Martin-Tretton, M.; Reha, M.; Drunsic, M.; Keim, M.

    2012-01-01T23:59:59.000Z

    DNV Renewables (USA) Inc. (DNV) used an Operations and Maintenance (O&M) Cost Model to evaluate ten distinct cost scenarios encountered under variations in wind turbine component failure rates. The analysis considers: (1) a Reference Scenario using the default part failure rates within the O&M Cost Model, (2) High Failure Rate Scenarios that increase the failure rates of three major components (blades, gearboxes, and generators) individually, (3) 100% Replacement Scenarios that model full replacement of these components over a 20 year operating life, and (4) Serial Failure Scenarios that model full replacement of blades, gearboxes, and generators in years 4 to 6 of the wind project. DNV selected these scenarios to represent a broad range of possible operational experiences. Also in this report, DNV summarizes the predominant financing arrangements used to develop wind energy projects over the past several years and provides summary data on various financial metrics describing those arrangements.

  16. Fast Charging Electric Vehicle Research & Development Project

    SciTech Connect (OSTI)

    Heny, Michael

    2014-03-31T23:59:59.000Z

    The research and development project supported the engineering, design and implementation of onroad Electric Vehicle (“EV”) charging technologies. It included development of potential solutions for DC fast chargers (“DCFC”) capable of converting high voltage AC power to the DC power required by EVs. Additional development evaluated solutions related to the packaging of power electronic components and enclosure design, as well as for the design and evaluation of EV charging stations. Research compared different charging technologies to identify optimum applications in a municipal fleet. This project collected EV usage data and generated a report demonstrating that EVs, when supported by adequate charging infrastructure, are capable of replacing traditional internal combustion vehicles in many municipal applications. The project’s period of performance has demonstrated various methods of incorporating EVs into a municipal environment, and has identified three general categories for EV applications: ? Short Commute: Defined as EVs performing in limited duration, routine commutes. ? Long Commute: Defined as tasks that require EVs to operate in longer daily mileage patterns. ? Critical Needs: Defined as the need for EVs to be ready at every moment for indefinite periods. Together, the City of Charlottesville, VA (the “City”) and Aker Wade Power Technologies, LLC (“Aker Wade”) concluded that the EV has a viable position in many municipal fleets but with limited recommendation for use in Critical Needs applications such as Police fleets. The report also documented that, compared to internal combustion vehicles, BEVs have lower vehiclerelated greenhouse gas (“GHG”) emissions and contribute to a reduction of air pollution in urban areas. The enhanced integration of EVs in a municipal fleet can result in reduced demand for imported oil and reduced municipal operating costs. The conclusions indicated in the project’s Engineering Report (see Attachment A) are intended to assist future implementation of electric vehicle technology. They are based on the cited research and on the empirical data collected and presented. The report is not expected to represent the entire operating conditions of any of the equipment under consideration within this project, and tested equipment may operate differently under other conditions.

  17. Library of Science & Medicine Roof Replacement and Related Work December 11, 2000 DSR # 0059-00 BSH

    E-Print Network [OSTI]

    Library of Science & Medicine Roof Replacement and Related Work December 11, 2000 DSR # 0059-00 BSH in sufficient de- tail to facilitate continued evaluation of Applications for Payment and progress reports of Science & Medicine Roof Replacement and Related Work December 11, 2000 DSR # 0059-00 BSH b. Submittals. c

  18. COMPUTER REPLACEMENT PROGRAM ELIGIBILITY: Faculty who are in good standing in their department are eligible to apply for a computer

    E-Print Network [OSTI]

    Qian, Ning

    COMPUTER REPLACEMENT PROGRAM ELIGIBILITY: Faculty who are in good standing in their department are eligible to apply for a computer replacement up to $1,300. The funding will be approved only if the faculty member has not purchased a computer with start-up, research, FRAP or other funds (including Computer

  19. River Protection Project (RPP) Project Management Plan

    SciTech Connect (OSTI)

    NAVARRO, J.E.

    2001-03-07T23:59:59.000Z

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  20. Construction and operation of replacement hazardous waste handling facility at Lawrence Berkeley Laboratory. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-09-01T23:59:59.000Z

    The US Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0423, for the construction and operation of a replacement hazardous waste handling facility (HWHF) and decontamination of the existing HWHF at Lawrence Berkeley Laboratory (LBL), Berkeley, California. The proposed facility would replace several older buildings and cargo containers currently being used for waste handling activities and consolidate the LBL`s existing waste handling activities in one location. The nature of the waste handling activities and the waste volume and characteristics would not change as a result of construction of the new facility. Based on the analysis in the EA, DOE has determined that the proposed action would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC. 4321 et seq. Therefore, an environmental impact statement is not required.

  1. Development of Replacements for Phoscoating Used in Forging, Extrusion and Metal Forming Processes

    SciTech Connect (OSTI)

    Kerry Barnett

    2003-03-01T23:59:59.000Z

    Many forging, extrusion, heading and other metal forming processes use graphite-based lubricants, phosphate coatings, and other potentially hazardous or harmful substances to improve the tribology of the metal forming process. The application of phosphate-based coatings has long been studied to determine if other synthetic ''clean'' lubricants could provide the same degree of protection afforded by phoscoatings and its formulations. So far, none meets the cost and performance objectives provided by phoscoatings as a general aid to the metal forming industry. In as much as phoscoatings and graphite have replaced lead-based lubricants, the metal forming industry has had previous experience with a legislated requirement to change processes. However, without a proactive approach to phoscoating replacement, many metal forming processes could find themselves without a cost effective tribology material necessary for the metal forming process

  2. Evaluation of replacement thread lubricants for red lead and graphite in mineral oil

    SciTech Connect (OSTI)

    Jungling, T.L.; Rauth, D.R.; Goldberg, D.

    1998-04-30T23:59:59.000Z

    Eight commercially available thread lubricants were evaluated to determine the best replacement for Red Lead and Graphite in Mineral Oil (RLGMO). The evaluation included coefficient of friction testing, high temperature anti-seizing testing, room temperature anti-galling testing, chemical analysis for detrimental impurities, corrosion testing, off-gas testing, and a review of health and environmental factors. The coefficient of friction testing covered a wide variety of factors including stud, nut, and washer materials, sizes, manufacturing methods, surface coatings, surface finishes, applied loads, run-in cycles, and relubrication. Only one lubricant, Dow Corning Molykote P37, met all the criteria established for a replacement lubricant. It has a coefficient of friction range similar to RLGMO. Therefore, it can be substituted directly for RLGMO without changing the currently specified fastener torque values for the sizes, materials and conditions evaluated. Other lubricants did not perform as well as Molykote P37 in one or more test or evaluation categories.

  3. The Home Microbiome Project

    ScienceCinema (OSTI)

    Gilbert, Jack

    2014-09-15T23:59:59.000Z

    The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

  4. Bacteria TMDL Projects

    E-Print Network [OSTI]

    Wythe, Kathy

    2007-01-01T23:59:59.000Z

    of TMDL projects for water bodies where swimming or wading may be unsafe or harvesting of oysters is limited or prohibited due to high concentrations of bacteria. ? Atascosa River: A TMDL Project for Bacteria ? Buffalo andWhite Oak Bayous: A TMDL...

  5. Why Insertion Turbine Meters are Replacing Orifice Plates for Steam Flow Measurement

    E-Print Network [OSTI]

    Rusnak, J. J.

    1983-01-01T23:59:59.000Z

    WHY INSERTION TURBINE MBTBRS A E REPLACING ORIFICE PLATES FOR STEAM FLOW MEASURE ENT J. J. Rusnak Engineering Measurements Company Longmont, Colorado ABSTRACT Flow measurement is a complex and application related discipline. It borders... to be instrumented quickly, economically and without dis rupting production; and further, these meters had to be accurate in order to be useful in making energy saving decisions. Thus, the entry of the insertion turbine meter for steam in 1975. Since then it has...

  6. Final report: Long Term Test of a Gear-Type Pump for the Am/Cm Project

    SciTech Connect (OSTI)

    Duignan, M.R. [Westinghouse Savannah River Company, AIKEN, SC (United States)

    1998-04-01T23:59:59.000Z

    At the request of the Immobilization Technology section, the Experimental Thermal Fluids group carried out a test to determine the operational characteristics of a gear-type pump. This pump was under consideration as a replacement for the air-lift melter feed pumping system of the Americium and Curium Project.

  7. A PROTOTYPE FOUR INCH SHORT HYDRIDE (FISH) BED AS A REPLACEMENT TRITIUM STORAGE BED

    SciTech Connect (OSTI)

    Klein, J.; Estochen, E.; Shanahan, K.; Heung, L.

    2011-02-23T23:59:59.000Z

    The Savannah River Site (SRS) tritium facilities have used 1st generation (Gen1) metal hydride storage bed assemblies with process vessels (PVs) fabricated from 3 inch nominal pipe size (NPS) pipe to hold up to 12.6 kg of LaNi{sub 4.25}Al{sub 0.75} metal hydride for tritium gas absorption, storage, and desorption for over 15 years. The 2nd generation (Gen2) of the bed design used the same NPS for the PV, but the added internal components produced a bed nominally 1.2 m long, and presented a significant challenge for heater cartridge replacement in a footprint limited glove-box. A prototype 3rd generation (Gen3) metal hydride storage bed has been designed and fabricated as a replacement candidate for the Gen2 storage bed. The prototype Gen3 bed uses a PV pipe diameter of 4 inch NPS so the bed length can be reduced below 0.7 m to facilitate heater cartridge replacement. For the Gen3 prototype bed, modeling results show increased absorption rates when using hydrides with lower absorption pressures. To improve absorption performance compared to the Gen2 beds, a LaNi{sub 4.15}Al{sub 0.85} material was procured and processed to obtain the desired pressure-composition-temperature (PCT) properties. Other bed design improvements are also presented.

  8. phenix.mr_rosetta: a new tool for difficult molecular replacement problems

    SciTech Connect (OSTI)

    Terwilliger, Thomas C [Los Alamos National Laboratory; Read, Randy [UNIV OF CAMBRIDGE; De Maio, Frank [UNIV OF WASHINGTON; Baker, David [UNIV OF WASHINGTON

    2011-01-12T23:59:59.000Z

    The PHENIX development team is working with the Baker laboratory at the University of Washington to combine the power of Rosetta structure modeling with PHENIX automated molecular replacement (MR), model-building, density modification, and refinement. The basic idea is to find MR solutions with phenix. automr, rebuild them with Rosetta, including electron density map information, then rebuild those models with phenix. autobuild. The combination of Rosetta rebuilding and phenix rebuilding is the key part of this method. MR solutions are found with phenix. automr (Phaser), scored with LLG (optionally following Rosetta relaxation), the best solutions are picked and rebuilt with Rosetta including map information, the resulting models are scored with Rosetta, and then rescored with LLG, and the top models are rebuilt with phenix. autobuild. It can be very useful for cases where the search model used in molecular replacement is slightly too distant to rebuild successfully with phenix. autobuild. It can also be useful in cases where the model is too distant to even find a molecular replacement solution, and prerefinement with Rosetta can yield an improved search model.

  9. Percutaneous Valve Replacement: Significance of Different Delivery Systems In Vitro and In Vivo

    SciTech Connect (OSTI)

    Attmann, Tim; Lutter, Georg, E-mail: lutter@kielheart.uni-kiel.de; Quaden, Rene [Christian Albrechts University of Kiel, Department of Cardiovascular Surgery, School of Medicine (Germany); Jahnke, Thomas [Christian Albrechts University of Kiel, Department of Radiology, School of Medicine (Germany); Rumberg, Kristin; Cremer, Jochen [Christian Albrechts University of Kiel, Department of Cardiovascular Surgery, School of Medicine (Germany); Muller-Hulsbeck, Stefan [Christian Albrechts University of Kiel, Department of Radiology, School of Medicine (Germany)

    2006-06-15T23:59:59.000Z

    Background and purpose. Percutaneous heart valve replacement is an exciting growing field in cardiovascular medicine yet still with some major problems. Only sophisticated improvement of the instruments could make it a real alternative to conventional surgery. Therefore, the aim of this study was to evaluate different delivery devices for percutaneous heart valve replacement in vitro and in vivo. Methods. A catheter prototype designed by our group, and two commercially available devices for the delivery of esophageal stents and aortic endoprostheses, were tested. After in vitro experiments, an ovine animal model of transfemoral pulmonary valve implantation was established using biological valved self-expanding stents. Only the delivery device for aortic endografts (Medtronic, Talent, Santa Rosa, CA, USA) allowed fast in vitro procedures without material fatigue. This device was chosen for the in vivo tests. Results. Technical success was achieved in 9 of 10 animals (90%). One animal died after perforation of the ventricular wall. Orthotopic pulmonary placement was performed in 6 animals and intentional supravalvular valved stent placement in 3 animals. Conclusions. An adequate in vitro model for this evolving field of interventional heart valve replacement is presented. Furthermore, the present study pinpoints the key characteristics that are mandatory for a delivery system in percutaneous pulmonary valve implantation. With regard to the delivery device's ductility observed during this 'venous' study, an approach to transfemoral aortic valve implantation seems feasible.

  10. Long-term allocation of power from the Snettisham Project. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1993-06-23T23:59:59.000Z

    The Alaska Power Administration (APA) has prepared an Environmental Assessment (EA) (DOE/EA-0839) evaluating the Final Marketing Plan for the Snettisham Project that establishes long-term allocation and sales of power. The proposed long-term sales contract will replace a 20-year sales agreement that expires at the end of December, 1993. The EA evaluates the proposed alternative and the no action alternative. The proposed alternative replaces the expiring contract with a new 20-year contract with the same terms, conditions and allocation as the previous long-term contract. No other alternatives were developed, as there is only one utility in the Juneau area. The divestiture of this Federal project is expected to be approved by Congress; the present contractor would then assume the ownership and operation of the Snettisham Project. The EA identified no actions associated with the proposal that will cause significant environmental or socioeconomic impacts. The Final Marketing Plan for the Snettisham Project deals with the replacement of an expiring contract. The Final Marketing Plan does not include the addition of any major new resources, service to discrete major new loads, or major changes in operating parameters. No changes in rates are proposed in the Final Marketing Plan.

  11. North American LNG Project Sourcebook

    SciTech Connect (OSTI)

    NONE

    2007-06-15T23:59:59.000Z

    The report provides a status of the development of LNG Import Terminal projects in North America, and includes 1-2 page profiles of 63 LNG projects in North America which are either in operation, under construction, or under development. For each project, the sourcebook provides information on the following elements: project description, project ownership, project status, projected operation date, storage capacity, sendout capacity, and pipeline interconnection.

  12. Microsoft Word - CX-FY10_Kalispell_District_Wood_Pole_Replacement...

    Broader source: Energy.gov (indexed) [DOE]

    suitable for a facility to be used for its designed purpose. Location: Various transmission lines located within the Kalispell District in Montana. See Project Location...

  13. NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT

    SciTech Connect (OSTI)

    Terry W. Battiest

    2008-06-11T23:59:59.000Z

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

  14. LIMB demonstration project extension

    SciTech Connect (OSTI)

    Not Available

    1990-09-21T23:59:59.000Z

    The purpose of the DOE limestone injection multistage burner (LIMB) Demonstration Project Extension is to extend the data base on LIMB technology and to expand DOE's list of Clean Coal Technologies by demonstrating the Coolside process as part of the project. The main objectives of this project are: to demonstrate the general applicability of LIMB technology by testing 3 coals and 4 sorbents (total of 12 coal/sorbent combinations) at the Ohio Edison Edgewater plant; and to demonstrate that Coolside is a viable technology for improving precipitator performance and reducing sulfur dioxide emissions while acceptable operability is maintained. Progress is reported. 3 figs.

  15. NEPA COMPLIANCE SURVEY Project Information Project Title: Casing...

    Broader source: Energy.gov (indexed) [DOE]

    Casing Drilling Test Date: 5-17-201 1 DOE Code: 6730-020-72000 Contractor Code: 8067-806 Project Lead: Marl< Duletsky Project Overview 1, Brief project description nclude The...

  16. Kellogg and Russ Forest projects. 2002 Project sand highlights

    E-Print Network [OSTI]

    Kellogg and Russ Forest projects. 2002 Project sand highlights MacCready Reserve a new property of insects Galeerucella calmariensis,and G.pusilla to control purple loosestrife on May 13. #12;New Project

  17. NEPA COMPLIANCE SURVEY Project Information Project Title: South...

    Broader source: Energy.gov (indexed) [DOE]

    Facility 2 Da te: 1-6-10 DOE Code: 6730.020.0000 Contracto r Code: 8067-788 Project Lead: Anthony Bowler Project Ove rview The purpose of the project is to build an additional...

  18. Flash Steam Recovery Project 

    E-Print Network [OSTI]

    Bronhold, C. J.

    2000-01-01T23:59:59.000Z

    /condensate recovery system, resulting in condensate flash steam losses to the atmosphere. Using computer simulation models and pinch analysis techniques, the Operational Excellence Group (Six Sigma) was able to identify a project to recover the flash steam losses as a...

  19. RM Power Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    rate-setting functions were integrated in 1990. The projects serve Colorado, Kansas, Nebraska and Wyoming with 830 MW of installed capacity and 3,360 miles of transmission line....

  20. Navajo Electrification Demonstraiton Project

    SciTech Connect (OSTI)

    Larry Ahasteen, Project Manager

    2006-07-17T23:59:59.000Z

    This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.