National Library of Energy BETA

Sample records for replace 773-a d-wing

  1. CX-008651: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Dismantle and Remove (D&R) and Replace 773-A D-Wing Air Handling and Condensing Units CX(s) Applied: B1.3 Date: 05/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  2. CX-008352: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Dismantle and Remove (D&R) and Replace 773-A D-Wing Air Handling and Condensing Units CX(s) Applied: B1.3 Date: 04/27/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  3. Energy Replacement Generation Tax Exemption

    Broader source: Energy.gov [DOE]

    Under the Energy Replacement Generation Tax Exemption, the following facilities are exempt from the replacement tax:

  4. Filter Replacement Activities Complete

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, 2014 Filter Replacement Activities Complete This week, filter replacements were safely and successfully completed. The high efficiency filters on the second filter unit were replaced on June 20, and employees replaced the moderate filters on June 23. Decontamination and cleanup of the work areas in the filter building will complete all activities currently scheduled for WIPP's ventilation system. Employees are also restoring higher airflow levels now that both filter units are operational.

  5. Radiation Source Replacement Workshop

    SciTech Connect (OSTI)

    Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

    2010-12-01

    This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

  6. replace fossil fuels

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    replace fossil fuels - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced

  7. Power Plant Replacement Study

    SciTech Connect (OSTI)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois Universitys aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  8. Power Plant Replacement Study

    SciTech Connect (OSTI)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University's aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  9. Power Plant Replacement Study

    SciTech Connect (OSTI)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  10. Power Plant Replacement Study

    SciTech Connect (OSTI)

    Reed, Gary

    2010-09-30

    This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self?funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois Universitys aging and failing circa 1925 central steam production plant. Twenty?three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

  11. WIPP Workers Perform Filter Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 10, 2015 WIPP Workers Perform Filter Replacement As recovery operations at the Waste Isolation Pilot Plant continue, increased work activity in the underground results in higher levels of airborne salt dust, increasing the frequency with which filters are replaced. Last week, workers performed a filter replacement on WIPP's Underground Ventilation System. WIPP's ventilation system has two filter units. Each unit has 84 separate filters arranges in four layers- moderate efficiency

  12. Replacement Cost of Domestic Crude

    Energy Science and Technology Software Center (OSTI)

    1994-12-01

    The DEEPWATER model forecasts the replacement cost of domestic crude oil for 13 offshore regions in the lower 48 states. The replacement cost of domestic crude oil is the constant or levelized selling price that will recover the full expense of exploration, development, and productions with a reasonable return on capital.

  13. Window Replacement, Rehabilitation, & Repair Guides - Building...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Effec...

  14. Do You Have Windows That Need Replacing?

    Broader source: Energy.gov [DOE]

    Do you have windows that need replacing, too? Do you have any plans to replace them with newer, more efficient windows?

  15. Modifications to Replacement Costs System

    SciTech Connect (OSTI)

    Godec, M. [ICF Resources, Inc., Fairfax, VA (United States)

    1989-05-18

    The purpose of this memorandum is to document the improvements and modifications made to the Replacement Costs of Crude Oil (REPCO) Supply Analysis System. While some of this work was performed under our previous support contract to DOE/ASFE, we are presenting all modifications and improvements are presented here for completeness. The memo primarily documents revisions made to the Lower-48 Onshore Model. Revisions and modifications made to other components and models in the REPCO system which are documented elsewhere are only highlighted in this memo. Generally, the modifications made to the Lower-48 Onshore Model reflect changes that have occurred in domestic drilling, oil field costs, and reserves since 1982, the date of the most recent available data used for the original Replacement Costs report, published in 1985.

  16. Replacing Lightbulbs and Ballasts | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Replace frequently used bulbs with more energy efficient options to save money and energy. Replace frequently used bulbs with more energy efficient options to save money and energy. Matching replacement lightbulbs to existing fixtures and ballasts can be tricky, especially with older fixtures. Using new fixtures made for new lightbulbs gives you the greatest energy savings, reliability, and longevity compared with simply replacing bulbs. Before replacing a lightbulb and/or ballast in a light

  17. Replacing an Oversized and Underloaded Electric Motor | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Replacing an Oversized and Underloaded Electric Motor Replacing an Oversized and Underloaded Electric Motor This fact sheet will assist in decisions regarding replacement of...

  18. Retail Replacement Lamps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CALiPER Testing » Application Reports » Retail Replacement Lamps Retail Replacement Lamps Annual CALiPER testing of A19, G25, candelabra, night light, MR16/PAR16, PAR20, and PAR30 replacement lamps - purchased directly from store shelves - offers insights on performance trends from year to year. The report findings offer valuable insights for manufacturers and retailers alike. Retail Lamps Study 3 (48 pages, February 2014) Retail Lamps Study 3.1: Dimming, Flicker, and Power Quality

  19. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    extensive maintenance and repairs. The turbine hubs on these units have experienced chronic oil leaks. The history of problems led to a decision to replace the turbine runners...

  20. Ni Clusterbank Replacement Project | Argonne Leadership Computing...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ni Clusterbank Replacement Project Event Sponsor: Argonne Leadership Computing Facility Seminar Start Date: Oct 20 2015 - 12:00pm BuildingRoom: Building 241Room D173...

  1. Conceptual Design Plan SM-43 Replacement Project

    SciTech Connect (OSTI)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  2. Replacement solvents for use in chemical synthesis

    DOE Patents [OSTI]

    Molnar, Linda K. (Philadelphia, PA); Hatton, T. Alan (Sudbury, MA); Buchwald, Stephen L. (Newton, MA)

    2001-05-15

    Replacement solvents for use in chemical synthesis include polymer-immobilized solvents having a flexible polymer backbone and a plurality of pendant groups attached onto the polymer backbone, the pendant groups comprising a flexible linking unit bound to the polymer backbone and to a terminal solvating moiety. The polymer-immobilized solvent may be dissolved in a benign medium. Replacement solvents for chemical reactions for which tetrahydrofuran or diethyl may be a solvent include substituted tetrahydrofurfuryl ethers and substituted tetrahydro-3-furan ethers. The replacement solvents may be readily recovered from the reaction train using conventional methods.

  3. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Gates Replacement This project is part of the Third Powerplant overhaul at Grand Coulee Dam. The full overhaul effort involves a mechanical overhaul of units G19 - G24. The...

  4. Marin County- Wood Stove Replacement Rebate Program

    Broader source: Energy.gov [DOE]

    Homes in the San Geronimo Valley (Forest Knolls, Lagunitas, San Geronimo, and Woodacre) can receive a rebate of $1,500 for the removal and replacement of non-certified wood burning appliances with...

  5. Replaces DOE F 5120.2

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    700.2 (09-93) Replaces DOE F 5120.2 (02-90) edition may be used 1. INITIATOR: NAME & ... Printed with soy ink on recycled paper Non Fillable INSTRUCTIONS FOR DOE F 5700.2, "WORK ...

  6. Nashville Gas treads carefully to replace pipe

    SciTech Connect (OSTI)

    1997-06-01

    The private gas utility, Nashville Gas, was responsible for replacing damaged or inadequate 2- and 4-inch steel gas lines beneath Music City, USA. The line replacements required either size for size or upsizing. The first choice was directional drilling, which was quickly determined to be unpractical because of rocky soil conditions. The second option was open trenching. Undoubtedly, trenching would mean having to contend with angry residents and tourists, since gas lines ran beneath yards, mature trees, sidewalks, roadways, and railways. In addition to the negative social factors, trenching would require additional funds for substantial landscaping and pavement replacement. It at all possible, a no-dig alternative was desired. Nashville Gas found Grundomat piercing tools which create a bore, then pushes pipe back through it. These same tools can simultaneously pull in pipe. These tools were customized for the Nashville project.

  7. Quenching and Partitioning Process Development to Replace Hot...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quenching and Partitioning Process Development to Replace Hot Stamping of High-Strength Automotive Steel Quenching and Partitioning Process Development to Replace Hot Stamping of ...

  8. Molecular replacement and model-building using distant homology...

    Office of Scientific and Technical Information (OSTI)

    Molecular replacement and model-building using distant homology models as templates Citation Details In-Document Search Title: Molecular replacement and model-building using...

  9. Avoiding a Train Wreck: Replacing Old Coal Plants with Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 This ...

  10. WPN 00-5: Approval of Replacement Refrigerators and Electric...

    Energy Savers [EERE]

    WPN 00-5: Approval of Replacement Refrigerators and Electric Water Heaters as Allowable Weatherization Measures WPN 00-5: Approval of Replacement Refrigerators and Electric Water...

  11. Measure Guideline: Window Repair, Rehabilitation, and Replacement

    SciTech Connect (OSTI)

    Baker, P.

    2012-12-01

    This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

  12. A Guide to AC Motor Repair and Replacement

    SciTech Connect (OSTI)

    2004-03-01

    This booklet provides helpful information for making informed repair or replace decisions for electric motors.

  13. Replaces EIA-459E OMB Control No.

    Energy Savers [EERE]

    5 (04-94) Replaces EIA-459E OMB Control No. 1910-0400 U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE MANAGEMENT SUMMARY REPORT Page of Public reporting burden for this collection of information is estimated to average 3.38 hours per response, including the time for reviewing instructions, search- ing existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this

  14. Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Prompts ENERGY STAR Program to Replace Web Tool, Saving 90 Percent of Annual Costs Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving 90 Percent of Annual Costs ...

  15. California: SQAMD Replaces Drayage Trucks with CNG | Department...

    Energy Savers [EERE]

    California: SQAMD Replaces Drayage Trucks with CNG California: SQAMD Replaces Drayage Trucks with CNG November 6, 2013 - 12:00am Addthis In 2008, the South Coast Air Quality ...

  16. Text-Alternative Version: LED Replacements for Linear Fluorescent Lamps

    Broader source: Energy.gov [DOE]

    Below is the text-alternative version of the "LED Replacements for Linear Fluorescent Lamps" webcast, held June 20, 2011.

  17. Trim or Replace Impellers on Oversized Pumps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Trim or Replace Impellers on Oversized Pumps Trim or Replace Impellers on Oversized Pumps This tip sheet discusses the reasoning behind trimming or replacing impellers on oversized pumps and describes how it works to improve pumping system efficiency. PUMPING SYSTEMS TIP SHEET #7 PDF icon Trim or Replace Impellers on Oversized Pumps (September 2006) More Documents & Publications Improving Pumping System Performance: A Sourcebook for Industry - Second Edition Match Pumps to System

  18. LED T8 Replacement Lamps | Department of Energy

    Energy Savers [EERE]

    LED T8 Replacement Lamps LED T8 Replacement Lamps This documents provides an overview of LED T8 replacement lamps and helps define a reasonable minimum performance level for the purpose of plant-wide improvement. PDF icon LED T8 Replacement Lamps (April 2010) More Documents & Publications Emerging Lighting Technology General Service LED Lamps Guiding Market Introduction of High-Performance SSL Products

  19. Alternatives to proposed replacement production reactors

    SciTech Connect (OSTI)

    Cullingford, H.S.

    1981-06-01

    To insure adequate supplies of plutonium and tritium for defense purposes, an independent evaluation was made by Los Alamos National Laboratory of the numerous alternatives to the proposed replacement production reactors (RPR). This effort concentrated on the defense fuel cycle operation and its technical implications in identifying the principal alternatives for the 1990s. The primary options were identified as (1) existing commercial reactors, (2) existing and planned government-owned facilities (not now used for defense materials production), and (3) other RPRs (not yet proposed) such as CANDU or CANDU-type heavy-water reactors (HWR) for both plutonium and tritium production. The evaluation considered features and differences of various options that could influence choice of RPR alternatives. Barring a change in the US approach to civilian and defense fuel cycles and precluding existing commercial reactors at government-owned sites, the most significant alternatives were identified as a CANDU-type HWR at Savannah River Plant (SRP) site or the Three Mile Island commercial reactor with reprocessing capability at Barnwell Nuclear Fuel Plant and at SRP.

  20. Virent is Replacing Crude Oil | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Virent is Replacing Crude Oil Virent is Replacing Crude Oil Breakout Session 2A-Conversion Technologies II: Bio-Oils, Sugar Intermediates, Precursors, Distributed Models, and Refinery Co-Processing Virent is Replacing Crude Oil Randy Cortright, Founder & Chief Technology Officer, Virent PDF icon cortright_biomass_2014.pdf More Documents & Publications Bioproducts and Biofuels - Growing Together! NABC Webinar Navigating Roadblocks on the Path to Advanced Biofuels Deployment

  1. Applications of molecular replacement to G protein-coupled receptors

    Office of Scientific and Technical Information (OSTI)

    (Journal Article) | SciTech Connect Applications of molecular replacement to G protein-coupled receptors Citation Details In-Document Search Title: Applications of molecular replacement to G protein-coupled receptors The use of molecular replacement in solving the structures of G protein-coupled receptors is discussed, with specific examples being described in detail. G protein-coupled receptors (GPCRs) are a large class of integral membrane proteins involved in regulating virtually every

  2. Replacement-1 Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Area: Replacement Energy System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at

  3. LED Replacements for Linear Fluorescent Lamps Webcast | Department of

    Energy Savers [EERE]

    Energy Replacements for Linear Fluorescent Lamps Webcast LED Replacements for Linear Fluorescent Lamps Webcast In this June 20, 2011 webcast on LED products marketed as replacements for linear fluorescent lamps, Jason Tuenge of the Pacific Northwest National Laboratory (PNNL) discussed current Lighting Facts-listed products as well as products evaluated in the latest CALiPER reports. Eric Richman, also of PNNL, reported on a recently completed GATEWAY demonstration project, in which LED and

  4. Building America Technology Solutions for New and Existing Homes: Replacing

    Energy Savers [EERE]

    Resistance Heating with Mini-Split Heat Pumps | Department of Energy Replacing Resistance Heating with Mini-Split Heat Pumps Building America Technology Solutions for New and Existing Homes: Replacing Resistance Heating with Mini-Split Heat Pumps In this project, the Advanced Residential Integrated Solutions team investigated the suitability of mini-split heat pumps for multifamily retrofits. PDF icon Replacing Resistance Heating with Mini-Split Heat Pumps More Documents & Publications

  5. Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems | Department of Energy Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered Energy Systems Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered Energy Systems May 1, 2014 - 9:33am Addthis The Agricultural Renewable Energy Conversion Incentive Program, funded in part by DOE's State Energy Program (SEP), assists farmers and ranchers to convert fossil-fueled agricultural production systems to renewable energy power. The program will install solar panels to replace

  6. Replace Fossil Fuels, Final Technical Report Roberts, William...

    Office of Scientific and Technical Information (OSTI)

    Crude Glycerol as Cost-Effective Fuel for Combined Heat and Power to Replace Fossil Fuels, Final Technical Report Roberts, William L 09 BIOMASS FUELS biofuels, glycerin, glycerol,...

  7. EERE Success Story-Arizona: Solar Panels Replace Inefficient...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered Energy Systems EERE Success Story-Arizona: ... fossil-fueled agricultural production systems to renewable energy power. ...

  8. Exploring the speed and performance of molecular replacement...

    Office of Scientific and Technical Information (OSTI)

    ab initio protein models Citation Details In-Document Search Title: Exploring the speed and performance of molecular replacement with AMPLE using QUARK ab initio protein models Two ...

  9. Quenching and Partitioning Process Development to Replace Hot...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ADVANCED MANUFACTURING OFFICE Quenching and Partitioning Process Development to Replace Hot Stamping of High-Strength Automotive Steel Novel Steel Heat Treatment Process to Produce ...

  10. Replace Pressure-Reducing Valves with Backpressure Turbogenerators

    Broader source: Energy.gov [DOE]

    This tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  11. Building America Case Study: Boiler Control Replacement for Hydronical...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... of the control parameters and provides real-time access to apartment temperature data. ... Boiler Control Replacement and Monitoring Study, at: buildingamerica.gov Image credit: All ...

  12. Jordan Malheur Resource Area Jonesboro Diversion Dam Replacement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The proposed replacement would help improve fish passage and facilitate continued ... the existing diversion dam to help improve fish passage and facilitate continued ...

  13. EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement...

    Broader source: Energy.gov (indexed) [DOE]

    Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA's proposed action was to fund the project. PUBLIC COMMENT...

  14. Monitoring Galvanic Replacement of Ag Nanoparticles by Pd using...

    Office of Scientific and Technical Information (OSTI)

    Conference: Monitoring Galvanic Replacement of Ag Nanoparticles by Pd using Low Dose In Situ Liquid STEM. Citation Details In-Document Search Title: Monitoring Galvanic ...

  15. Magnetic Nanoparticle Capilary Flow as a Replacement for Lateral...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Magnetic Nanoparticle Capilary Flow as a Replacement for Lateral Flow Chromatography Colorado School of Mines Contact CSM About This Technology Technology Marketing SummaryThis...

  16. "Green" Replacement for Industrial Applications of Polar Organic...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Find More Like This Return to Search "Green" Replacement for Industrial Applications ... The lower volatility can lead to more energy intensive separation of the solvent; however, ...

  17. Trim or Replace Impellers on Oversized Pumps

    SciTech Connect (OSTI)

    Not Available

    2006-09-01

    One in a series of tip sheets to help manufacturers optimize their industrial pumping systems. As a result of conservative engineering practices, pumps are often substantially larger than they need to be for an industrial plant's process requirements. Centrifugal pumps can often be oversized because of ''rounding up'', trying to accommodate gradual increases in pipe surface roughness and flow resistance over time, or anticipating future plant capacity expansions. In addition, the plant's pumping requirements might not have been clearly defined during the design phase. Because of this conservative approach, pumps can have operating points completely different from their design points. The pump head is often less than expected, while the flow rate is greater. This can cause cavitation and waste energy as the flow rate typically must be regulated with bypass or throttle control. Oversized and throttled pumps that produce excess pressure are excellent candidates for impeller replacement or ''trimming'', to save energy and reduce costs. Trimming involves machining the impeller to reduce its diameter. Trimming should be limited to about 75% of a pump's maximum impeller diameter, because excessive trimming can result in a mismatched impeller and casing. As the impeller diameter decreases, added clearance between the impeller and the fixed pump casing increases internal flow recirculation, causes head loss, and lowers pumping efficiency. For manufacturing standardization purposes, pump casings and shafts are designed to accommodate impellers in a range of sizes. Many pump manufacturers provide pump performance curves that indicate how various models will perform with different impeller diameters or trims. The impeller should not be trimmed any smaller than the minimum diameter shown on the curve. Net positive suction head requirements (NPSHR) usually decrease at lower flow rates and can increase at the higher end of the pump head curve. The NPSHR at a given flow rate will normally be greater with a smaller impeller, but engineers should consult with the pump manufacturer to determine variations in NPSHR before trimming the impeller. Manufacturers can often provide trim correction charts based on historical test data.

  18. Replacing 16 mm film cameras with high definition digital cameras

    SciTech Connect (OSTI)

    Balch, K.S.

    1995-12-31

    For many years 16 mm film cameras have been used in severe environments. These film cameras are used on Hy-G automotive sleds, airborne gun cameras, range tracking and other hazardous environments. The companies and government agencies using these cameras are in need of replacing them with a more cost effective solution. Film-based cameras still produce the best resolving capability, however, film development time, chemical disposal, recurring media cost, and faster digital analysis are factors influencing the desire for a 16 mm film camera replacement. This paper will describe a new camera from Kodak that has been designed to replace 16 mm high speed film cameras.

  19. REQUEST FOR LOST/STOLEN BADGE REPLACEMENT | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REQUEST FOR LOST/STOLEN BADGE REPLACEMENT REQUEST FOR LOST/STOLEN BADGE REPLACEMENT Form documents the circumstances surrounding the loss of the security badge, i.e., the date the badge was Iost/stolen, location where the badge may have been Iost/stolen, attempts to find the lost badge, etc. PDF icon REQUEST FOR LOST/STOLEN BADGE REPLACEMENT More Documents & Publications DOE HQ F 473.1 (fillable pdf) DOE F 5639.2 DOE F 5634.1

  20. LED Performance Specification Series: T8 Replacement Lamps

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Photo credit: PNNL LED T8 replacements may contain dozens of high power LEDs or hundreds of 5mm LEDs behind a clear or frosted lens, all in a medium bi-pin T8 lamp package. Table 1. CALiPER Test Results for 4-foot LED T8 Replacements with Fluorescent Benchmarks Performance Characteristics LED T8 Replacements Fluorescent Benchmarks Range (12 lamps tested) Average Mfr. Data (75 lamps) CALiPER (2 fxtures tested) Initial Lamp Light Output (lm) 345 - 1,579 1,111 2,778 3,091 Initial 2-Lamp System

  1. EA-0923: Winnett School District Boiler Replacement Project, Winnett, Montana

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal to replace the Winnett School District complex's existing oil-fired heating system with a new coal-fired heating system with funds...

  2. Laboratory Evaluation of LED T8 Replacement Lamp Products

    SciTech Connect (OSTI)

    Richman, Eric E.; Kinzey, Bruce R.; Miller, Naomi J.

    2011-05-23

    A report on a lab setting analysis involving LED lamps intended to directly replace T8 fluorescent lamps (4') showing light output, power, and economic comparisons with other fluorescent options.

  3. Ultrasound image guided acetabular implant orientation during total hip replacement

    DOE Patents [OSTI]

    Chang, John; Haddad, Waleed; Kluiwstra, Jan-Ulco; Matthews, Dennis; Trauner, Kenneth

    2003-08-19

    A system for assisting in precise location of the acetabular implant during total hip replacement. The system uses ultrasound imaging for guiding the placement and orientation of the implant.

  4. Reminder: Y-12 Public Warning Siren System being replaced, tested...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    located around the Oak Ridge area is being replaced this month with a test of the new system on Sept. 26. The vendor, American Signal, will be testing the sirens Sept. 26...

  5. Replace Pressure-Reducing Valves with Backpressure Turbogenerators

    SciTech Connect (OSTI)

    Not Available

    2006-01-01

    This revised ITP steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  6. Washington State Department of Ecology: Replacement Wells Requiring...

    Open Energy Info (EERE)

    Ecology: Replacement Wells Requiring a Water Right Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Washington State Department of...

  7. Quenching and Partitioning Process Development to Replace Hot Stamping of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High-Strength Automotive Steel | Department of Energy Quenching and Partitioning Process Development to Replace Hot Stamping of High-Strength Automotive Steel Quenching and Partitioning Process Development to Replace Hot Stamping of High-Strength Automotive Steel A combination of deep alloy development experience, designed experiments, computational tools, and characterization instruments will develop Quenching and Partitioning processing for Third-Generation Advanced High-Strength Steels

  8. Exploring the speed and performance of molecular replacement with AMPLE

    Office of Scientific and Technical Information (OSTI)

    using QUARK ab initio protein models (Journal Article) | SciTech Connect Exploring the speed and performance of molecular replacement with AMPLE using QUARK ab initio protein models Citation Details In-Document Search Title: Exploring the speed and performance of molecular replacement with AMPLE using QUARK ab initio protein models Two ab initio modelling programs solve complementary sets of targets, enhancing the success of AMPLE with small proteins. AMPLE clusters and truncates ab initio

  9. Cobalt discovery replaces precious metals as industrial catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cobalt Discovery Replaces Precious Metals Cobalt discovery replaces precious metals as industrial catalyst Cobalt holds promise as an industrial catalyst with potential applications in such energy-related technologies such as production of biofuels and reduction of carbon dioxide. November 26, 2012 The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. The artwork depicts the

  10. Cobalt discovery replaces precious metals as industrial catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cobalt Discovery Replaces Precious Metals Cobalt discovery replaces precious metals as industrial catalyst Cobalt holds promise as an industrial catalyst with potential applications in such energy-related technologies such as production of biofuels and reduction of carbon dioxide. November 26, 2012 The artwork depicts the substitution of cobalt for precious metals in catalysis as a variation on the ancient alchemical theme of transmuting base metals into precious ones. The artwork depicts the

  11. Replacement-2-A Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale Power Rate Schedule Area: Replacement Energy System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom power is provided pursuant to contracts between the Government and the customer from the John H. Kerr and Philpott Projects (or Kerr-Philpott System). This rate schedule shall be applicable to the sale of

  12. Biomass 2011: Replace the Whole Barrel, Supply the Whole Market |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1: Replace the Whole Barrel, Supply the Whole Market Biomass 2011: Replace the Whole Barrel, Supply the Whole Market The New Horizons of Bioenergy Biomass 2011 July 26-27, 2011 Gaylord National Resort and Convention Center 201 Waterfront Street National Harbor, MD 20745 Thank you to everyone who attended and participated to help make Biomass 2011 a remarkable success. More than 600 speakers, moderators, sponsors, exhibitors, and attendees were able to listen to

  13. EERE Success Story-Arizona: Solar Panels Replace Inefficient Fossil

    Office of Environmental Management (EM)

    Fuel-Powered Energy Systems | Department of Energy Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered Energy Systems EERE Success Story-Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered Energy Systems May 1, 2014 - 9:33am Addthis The Agricultural Renewable Energy Conversion Incentive Program, funded in part by DOE's State Energy Program (SEP), assists farmers and ranchers to convert fossil-fueled agricultural production systems to renewable energy power. The program

  14. Simple Maintenance Saves Costly Furnace Repair/Replacement | Department of

    Energy Savers [EERE]

    Energy Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement January 6, 2010 - 8:26am Addthis Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory For the past few weeks, my forced-air gas furnace has been on the fritz. I blame this on the fact that I haven't been as diligent as I should have been with regular furnace maintenance, which includes: Checking the condition of the vent connection pipe and

  15. CALiPER Special Summary Report: Retail Replacement Lamp Testing

    SciTech Connect (OSTI)

    2011-04-01

    CALiPER testing has evaluated many products for commercial lighting markets and found some excellent performers. However, many of these are not available on the retail market. This special testing was undertaken to identify and test solid-state lighting (SSL) replacement lamp products that are available to the general public through retail stores and websites.

  16. Replacing the whole barrel of oil with plants and microbes

    ScienceCinema (OSTI)

    Simmons, Blake

    2014-06-24

    In this May 13, 2013 talk, Blake Simmons discusses how scientists are exploring how plants and microbes can be used to replace many of the everyday goods we use that are derived from petroleum. To watch the entire entire Science at the Theater event, in which seven of our scientists present BIG ideas in eight minutes each.

  17. CALiPER Exploratory Study Retail Replacement Lamps – 2011

    SciTech Connect (OSTI)

    2012-04-02

    In 2010, CALiPER conducted a study on LED replacement lamps found in retail stores. The results were less than satisfactory, and many products were classified as being unlikely to meet consumer expectations. In November 2011, CALiPER purchased a new sample of products for a follow-up study, with the intent of characterizing the progress of this essential market segment.

  18. Measure Guideline. Wood Window Repair, Rehabilitation, and Replacement

    SciTech Connect (OSTI)

    Baker, P.; Eng, P.

    2012-12-01

    This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

  19. Replacing the whole barrel of oil with plants and microbes

    SciTech Connect (OSTI)

    Simmons, Blake

    2013-05-29

    In this May 13, 2013 talk, Blake Simmons discusses how scientists are exploring how plants and microbes can be used to replace many of the everyday goods we use that are derived from petroleum. To watch the entire entire Science at the Theater event, in which seven of our scientists present BIG ideas in eight minutes each.

  20. HVAC & Building Management Control System Energy Efficiency Replacements

    SciTech Connect (OSTI)

    Hernandez, Adriana

    2012-09-21

    The project objective was the replacement of an aging, un-repairable HVAC system which has grown inefficient and a huge energy consumer with low energy and efficient HVAC units, and installation of energy efficient building control technologies at City's YMCA Community Center.

  1. Replacement of alloy 800H superheated steam line

    SciTech Connect (OSTI)

    Barbier, R.A.; Bullock, J.W. [Sterling Chemicals, Texas City, TX (United States)

    1996-07-01

    Sterling Chemicals utilizes alloy 800HT (UNS N08811) piping for superheated steam service in its styrene dehydrogenation unit. An engineering project to replace these lines was recently completed. Material acquisition, shop fabrication, inspection requirements, and field erection will be highlighted in this paper.

  2. Selection and Implementation of a Replacement Cutting Tool Selection Application

    SciTech Connect (OSTI)

    Rice, Gordon

    2008-10-06

    A new commercial cutting tool software package replaced an internally created legacy system. This report describes the issues that surfaced during the migration and installation of the commercial package and the solutions employed. The primary issues discussed are restructuring the data between two drastically different database schemas and the creation of individual component graphics.

  3. ARP/wARP and molecular replacement: the next generation

    SciTech Connect (OSTI)

    Cohen, Serge X. Ben Jelloul, Marouane; Long, Fei; Vagin, Alexei; Knipscheer, Puck; Lebbink, Joyce; Sixma, Titia K.; Lamzin, Victor S.; Murshudov, Garib N.; Perrakis, Anastassis

    2008-01-01

    A systematic test shows how ARP/wARP deals with automated model building for structures that have been solved by molecular replacement. A description of protocols in the flex-wARP control system and studies of two specific cases are also presented. Automatic iterative model (re-)building, as implemented in ARP/wARP and its new control system flex-wARP, is particularly well suited to follow structure solution by molecular replacement. More than 100 molecular-replacement solutions automatically solved by the BALBES software were submitted to three standard protocols in flex-wARP and the results were compared with final models from the PDB. Standard metrics were gathered in a systematic way and enabled the drawing of statistical conclusions on the advantages of each protocol. Based on this analysis, an empirical estimator was proposed that predicts how good the final model produced by flex-wARP is likely to be based on the experimental data and the quality of the molecular-replacement solution. To introduce the differences between the three flex-wARP protocols (keeping the complete search model, converting it to atomic coordinates but ignoring atom identities or using the electron-density map calculated from the molecular-replacement solution), two examples are also discussed in detail, focusing on the evolution of the models during iterative rebuilding. This highlights the diversity of paths that the flex-wARP control system can employ to reach a nearly complete and accurate model while actually starting from the same initial information.

  4. Measure Guideline: Air Conditioner Diagnostics, Maintenance, and Replacement

    SciTech Connect (OSTI)

    Springer, D.; Dakin, B.

    2013-03-01

    This guideline responds to the need for an efficient means of identifying, diagnosing, and repairing faults in air conditioning systems in existing homes that are undergoing energy upgrades. Inadequate airflow due to constricted ducts or undersized filters, improper refrigerant charge, and other system defects can be corrected at a fraction of the cost of equipment replacement and can yield significant savings. The guideline presents a two-step approach to diagnostics and repair.

  5. Polypeptide having an amino acid replaced with N-benzylglycine

    DOE Patents [OSTI]

    Mitchell, Alexander R. (Livermore, CA); Young, Janis D. (Los Angeles, CA)

    1996-01-01

    The present invention relates to one or more polypeptides having useful biological activity in a mammal, which comprise: a polypeptide related to bradykinin of four to ten amino acid residues wherein one or more specific amino acids in the polypeptide chain are replaced with achiral N-benzylglycine. These polypeptide analogues have useful potent agonist or antagonist pharmacological properties depending upon the structure. A preferred polypeptide is (N-benzylglycine.sup.7)-bradykinin.

  6. OSRAM SYLVANIA Develops High-Efficiency LED Troffer Replacement

    Broader source: Energy.gov [DOE]

    With the help of DOE funding, OSRAM SYLVANIA is developing a high-efficiency LED 2'x2' troffer replacement that is expected to be commercially available in the spring of 2012 and to be cost-competitive with existing troffers of that size. It is projected to have a light output of up to 4,000 lumens, an efficacy of more than 100 lm/W, and a CCT of 3500K.

  7. Replacement-3 Wholesale Power Rate Schedule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Wholesale Power Rate Schedule Replacement-3 Wholesale Power Rate Schedule Area: Virginia, North Carolina, Tennessee, Georgia, Alabama, Mississippi, Kentucky, southern Illinois System: CU This rate schedule shall be available to public bodies and cooperatives ( any one of whom is hereinafter called the Customer) in Virginia, North Carolina, Tennessee, Georgia, Alabama, Mississippi, Kentucky and southern Illinois to whom power is provided pursuant to contracts between the Government and the

  8. COLLOQUIUM: Are Mushrooms the Next Polymers?: Growing Plastic Replacements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    with Fungi | Princeton Plasma Physics Lab March 20, 2013, 4:15pm to 6:30pm Colloquia MBG Auditorium COLLOQUIUM: Are Mushrooms the Next Polymers?: Growing Plastic Replacements with Fungi Mr. Gavin McIntyre Ecovative Design LLC Colloquium Committee: The Princeton Plasma Physics Laboratory 2015-2016 Colloquium Committee is comprised of the following people. Please feel free to contact them by e-mail regarding any possible speakers or topics for future colloquia. Carol Ann Austin,

  9. Window Replacement, Rehabilitation, & Repair Guides - Building America Top

    Broader source: Energy.gov (indexed) [DOE]

    Innovation | Department of Energy window repair.jpg This Top Innovation describes research by Building Science Corporation to determine that whole-house energy savings of up to 10% can be achieved through repair and rehabilitation of windows, potentially improving the energy efficiency of more than 5 million U.S. homes annually. The team developed a series of guides for homeowners and contractors that recommend various options for repairing or replacing old windows. The options include

  10. CX-010857: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Replace 735-A South Header Ductwork Located on D-wing Service Floor CX(s) Applied: B2.3 Date: 07/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  11. Electronic-type vacuum gauges with replaceable elements

    DOE Patents [OSTI]

    Edwards, Jr., David (7 Brown's La., Bellport, NY 11713)

    1984-01-01

    In electronic devices for measuring pressures in vacuum systems, the metal elements which undergo thermal deterioration are made readily replaceable by making them parts of a simple plug-in unit. Thus, in ionization gauges, the filament and grid or electron collector are mounted on the novel plug-in unit. In thermocouple pressure gauges, the heater and attached thermocouple are mounted on the plug-in unit. Plug-in units have been designed to function, alternatively, as ionization gauge and as thermocouple gauge, thus providing new gauges capable of measuring broader pressure ranges than is possible with either an ionization gauge or a thermocouple gauge.

  12. Electronic-type vacuum gauges with replaceable elements

    DOE Patents [OSTI]

    Edwards, D. Jr.

    1984-09-18

    In electronic devices for measuring pressures in vacuum systems, the metal elements which undergo thermal deterioration are made readily replaceable by making them parts of a simple plug-in unit. Thus, in ionization gauges, the filament and grid or electron collector are mounted on the novel plug-in unit. In thermocouple pressure gauges, the heater and attached thermocouple are mounted on the plug-in unit. Plug-in units have been designed to function, alternatively, as ionization gauge and as thermocouple gauge, thus providing new gauges capable of measuring broader pressure ranges than is possible with either an ionization gauge or a thermocouple gauge. 5 figs.

  13. New Feedstocks and Replacement Fuels - Future Energy for Mobility |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Fuels - Future Energy for Mobility New Feedstocks and Replacement Fuels - Future Energy for Mobility Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan. Sponsored by the U.S. DOE's EERE FreedomCar and Fuel Partnership and 21st Century Truck Programs. PDF icon 2006_deer_simnick.pdf More Documents & Publications Fuel-Cycle Energy and Emissions Analysis with the GREET Model Cross-cutting Technologies for Advanced Biofuels Well-to-Wheels Analysis of

  14. Nuclear criticality safety assessment of the proposed CFC replacement coolants

    SciTech Connect (OSTI)

    Jordan, W.C.; Dyer, H.R.

    1993-12-01

    The neutron multiplication characteristics of refrigerant-114 (R-114) and proposed replacement coolants perfluorobutane (C{sub 4}F{sub 10}) and cycloperfluorobutane C{sub 4}F{sub 8}) have been compared by evaluating the infinite media multiplication factors of UF{sub 6}/H/coolant systems and by replacement calculations considering a 10-MW freezer/sublimer. The results of these comparisons demonstrate that R-114 is a neutron absorber, due to its chlorine content, and that the alternative fluorocarbon coolants are neutron moderators. Estimates of critical spherical geometries considering mixtures of UF{sub 6}/HF/C{sub 4}F{sub 10} indicate that the flourocarbon-moderated systems are large compared with water-moderated systems. The freezer/sublimer calculations indicate that the alternative coolants are more reactive than R-114, but that the reactivity remains significantly below the condition of water in the tubes, which was a limiting condition. Based on these results, the alternative coolants appear to be acceptable; however, several follow-up tasks have been recommended, and additional evaluation will be required on an individual equipment basis.

  15. Operational Readiness Review: Savannah River Replacement Tritium Facility

    SciTech Connect (OSTI)

    Not Available

    1993-02-01

    The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members.

  16. How do I know if my RTUs are Efficient? When do I Replace or...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    How do I know if my RTUs are Efficient? When do I Replace or Retrofit them? How do I know if my RTUs are Efficient? When do I Replace or Retrofit them? December 2, 2015 - 3:05pm ...

  17. Webinar: The L Prize-Winning LED A19 Replacement-What Commercial...

    Energy Savers [EERE]

    The L Prize-Winning LED A19 Replacement-What Commercial Building OwnersOperators Can Expect in 2012 Webinar: The L Prize-Winning LED A19 Replacement-What Commercial Building ...

  18. CALiPER Benchmark Report: Performance of Halogen Incandescent MR16 Lamps and LED Replacement

    SciTech Connect (OSTI)

    Paget, M. L.; Lingard, R. D.; Myer, M. A.

    2008-11-01

    This benchmark report addresses the halogen MR16 lamp and its commercially available light-emitting diode (LED) replacements.

  19. DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR DWPF

    SciTech Connect (OSTI)

    Krementz, D.; Coughlin, Jeffrey

    2009-05-05

    The Defense Waste Processing Facility (DWPF) requested the Savannah River National Laboratory (SRNL) to develop tooling and equipment to remotely replace gaskets in mechanical Hanford connectors to reduce personnel radiation exposure as compared to the current hands-on method. It is also expected that radiation levels will continually increase with future waste streams. The equipment is operated in the Remote Equipment Decontamination Cell (REDC), which is equipped with compressed air, two master-slave manipulators (MSM's) and an electro-mechanical manipulator (EMM) arm for operation of the remote tools. The REDC does not provide access to electrical power, so the equipment must be manually or pneumatically operated. The MSM's have a load limit at full extension of ten pounds, which limited the weight of the installation tool. In order to remotely replace Hanford connector gaskets several operations must be performed remotely, these include: removal of the spent gasket and retaining ring (retaining ring is also called snap ring), loading the new snap ring and gasket into the installation tool and installation of the new gasket into the Hanford connector. SRNL developed and tested tools that successfully perform all of the necessary tasks. Removal of snap rings from horizontal and vertical connectors is performed by separate air actuated retaining ring removal tools and is manipulated in the cell by the MSM. In order install a new gasket, the snap ring loader is used to load a new snap ring into a groove in the gasket installation tool. A new gasket is placed on the installation tool and retained by custom springs. An MSM lifts the installation tool and presses the mounted gasket against the connector block. Once the installation tool is in position, the gasket and snap ring are installed onto the connector by pneumatic actuation. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and vents the tools as needed. Extensive testing of tooling operation was performed in the DWPF manipulator repair shop. This testing allowed the operators to gain confidence before the equipment was exposed to radioactive contamination. The testing also led to multiple design improvements. On July 17 and 29, 2008 the Remote Gasket Replacement Tooling was successfully demonstrated in the REDC at the DWPF of The Savannah River Site.

  20. Replacing precious metals with carbide catalysts for hydrogenation reactions

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ruijun, Hou; Chen, Jingguang G.; Chang, Kuan; Wang, Tiefeng

    2015-03-03

    Molybdenum carbide (Mo₂C and Ni/Mo₂C) catalysts were compared with Pd/SiO₂ for the hydrogenation of several diene molecules, 1,3- butadiene, 1,3- and 1,4-cyclohexadiene (CHD). Compared to Pd/SiO₂, Mo₂C showed similar hydrogenation rate for 1,3-butadiene and 1,3-CHD and even higher rate for 1,4-CHD, but with significant deactivation rate for 1,3-CHD hydrogenation. However, the hydrogenation activity of Mo₂C could be completely regenerated by H₂ treatment at 723 K for the three molecules. The Ni modified Mo₂C catalysts retained similar activity for 1,3-butadiene hydrogenation with significantly enhanced selectivity for 1-butene production. The 1-butene selectivity increased with increasing Ni loading below 15%. Among the Nimore » modified Mo₂C catalysts, 8.6%Ni/Mo₂C showed the highest selectivity to 1-butene, which was even higher selectivity than that over Pd/SiO₂. Compared to Pd/SiO₂, both Mo₂C and Ni/Mo₂C showed combined advantages in hydrogenation activity and catalyst cost reduction, demonstrating the potential to use less expensive carbide catalysts to replace precious metals for hydrogenation reactions.« less

  1. Replacing precious metals with carbide catalysts for hydrogenation reactions

    SciTech Connect (OSTI)

    Ruijun, Hou; Chen, Jingguang G.; Chang, Kuan; Wang, Tiefeng

    2015-03-03

    Molybdenum carbide (Mo?C and Ni/Mo?C) catalysts were compared with Pd/SiO? for the hydrogenation of several diene molecules, 1,3- butadiene, 1,3- and 1,4-cyclohexadiene (CHD). Compared to Pd/SiO?, Mo?C showed similar hydrogenation rate for 1,3-butadiene and 1,3-CHD and even higher rate for 1,4-CHD, but with significant deactivation rate for 1,3-CHD hydrogenation. However, the hydrogenation activity of Mo?C could be completely regenerated by H? treatment at 723 K for the three molecules. The Ni modified Mo?C catalysts retained similar activity for 1,3-butadiene hydrogenation with significantly enhanced selectivity for 1-butene production. The 1-butene selectivity increased with increasing Ni loading below 15%. Among the Ni modified Mo?C catalysts, 8.6%Ni/Mo?C showed the highest selectivity to 1-butene, which was even higher selectivity than that over Pd/SiO?. Compared to Pd/SiO?, both Mo?C and Ni/Mo?C showed combined advantages in hydrogenation activity and catalyst cost reduction, demonstrating the potential to use less expensive carbide catalysts to replace precious metals for hydrogenation reactions.

  2. KP-Replacement-2-B Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    Replacement-2-B Wholesale Power Rate Schedule KP-Replacement-2-B Wholesale Power Rate Schedule Area: Replacement Energy System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom power is provided pursuant to contracts between the Government and the customer from the John H. Kerr and Philpott Projects (or Kerr-Philpott System). This rate schedule shall be applicable to

  3. Replacing the Whole BarrelTo Reduce U.S. Dependence on Oil | Department of

    Energy Savers [EERE]

    Energy Replacing the Whole BarrelTo Reduce U.S. Dependence on Oil Replacing the Whole BarrelTo Reduce U.S. Dependence on Oil Converting domestic biomass into affordable fuels, products, and power supports our national strategy to diversify energy resources and reduce dependence on imported oil. PDF icon replacing_barrel_overview.pdf More Documents & Publications Thermochemical Conversion: Using Heat and Catalysis to Make Biofuels and Bioproducts Bioenergy Technologies Office Conversion

  4. LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR®

    Energy Savers [EERE]

    | Department of Energy Replacement Lamps: Current Performance and the Latest on ENERGY STAR® LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® This May 19, 2009 webcast summarized CALiPER's recent benchmark testing of common omnidirectional incandescent lamps (e.g., A-lamps), and provided an update on ENERGY STAR criteria for LED integral replacement lamps - currently in its second draft. Robert Lingard of Pacific Northwest National Laboratory (PNNL) gave an

  5. EERE Success Story-California: SQAMD Replaces Drayage Trucks with CNG |

    Energy Savers [EERE]

    Department of Energy California: SQAMD Replaces Drayage Trucks with CNG EERE Success Story-California: SQAMD Replaces Drayage Trucks with CNG November 6, 2013 - 12:00am Addthis In 2008, the South Coast Air Quality Management District (AQMD) Heavy-Duty Natural Gas Drayage Truck Replacement Program started to address a significant need to reduce diesel emissions and associated public health risks from goods movement at the Ports of Los Angeles and Long Beach. In 2010, the two ports processed

  6. Is it Cost-Effective to Replace Old Eddy-Current Drives? | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Is it Cost-Effective to Replace Old Eddy-Current Drives? Is it Cost-Effective to Replace Old Eddy-Current Drives? New pulse-width-modulated (PWM) adjustable speed drives (ASDs) may be cost-effective replacements for aging or maintenance-intensive eddy-current drives. This tip sheet provides suggested actions and example energy savings calculations. Motor Systems Tip Sheet #12 PDF icon Is it Cost-Effective to Replace Old Eddy-Current Drives? (November 2012) More Documents &

  7. Y-12 Public Warning Siren System being replaced, tested this month | Y-12

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Security Complex Public Warning Siren ... Y-12 Public Warning Siren System being replaced, tested this month Posted: September 4, 2012 - 1:08pm The Y-12 Public Warning Siren System (PWSS) located around the Oak Ridge area is being replaced this month with a test of the new system to follow. A private contractor will begin replacement of the electronic sirens today with anticipated completion of the replacement Sept. 14. During this time, workers will be removing old sirens and

  8. Text-Alternative Version: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR®

    Broader source: Energy.gov [DOE]

    Below is the text-alternative version of the LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® webcast.

  9. Is it Cost-Effective to Replace Old Eddy-Current Drives? - Motor Tip Sheet #12

    SciTech Connect (OSTI)

    2008-07-01

    New pulse-width-modulated (PWM) adjustable speed drives (ASDs) may be cost-effective replacements for aging or maintenance-intensive eddy-current drives.

  10. Building America Top Innovations 2013 Profile Window Replacement, Rehabilitation, & Repair Guide

    SciTech Connect (OSTI)

    none,

    2013-09-01

    In this Top Innovation profile, Building Science Corporation guides contractors through several options for repairing or replacing old windows to improve air sealing and thermal performance.

  11. CALiPER Benchmark Report: Performance of Incandescent A Type and Decorative Lamps and LED Replacements

    SciTech Connect (OSTI)

    Lingard, R. D.; Myer, M. A.; Paget, M. L.

    2008-11-01

    This benchmark report addresses common omnidirectional incandescent lamps - A-type and small decorative, candelabra-type lamps - and their commercially available light-emitting diode (LED) replacements.

  12. Feasibility/alternatives study for the planned replacement of Nuclear Material Safeguards System (NMSS)

    SciTech Connect (OSTI)

    McBride, K.C.; Russell, V.K.

    1994-10-04

    This document is a study which describes the NMSS replacement alternatives and provides recommended solutions. It also describes a NMSS Paradox prototype.

  13. Steam Plant Replaces Outdated Coal-Fired System | Department of Energy

    Energy Savers [EERE]

    Steam Plant Replaces Outdated Coal-Fired System Steam Plant Replaces Outdated Coal-Fired System September 1, 2012 - 12:00pm Addthis A new natural gas-fired steam plant will replace an older coal-fired steam plant shown here. The new plant has the capacity to heat buildings at the Portsmouth site much more efficiently than the old coal-fired steam plant. A new natural gas-fired steam plant will replace an older coal-fired steam plant shown here. The new plant has the capacity to heat buildings at

  14. How do I know if my RTUs are Efficient? When do I Replace or Retrofit them?

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy How do I know if my RTUs are Efficient? When do I Replace or Retrofit them? How do I know if my RTUs are Efficient? When do I Replace or Retrofit them? December 2, 2015 - 3:05pm Addthis Advanced RTU Campaign: Decision Tree for RTU Replacements or Retrofits Advanced RTU Campaign: Decision Tree for RTU Replacements or Retrofits By Marta Schantz This is the second in a blog series on DOE's Advanced Rooftop Unit Campaign. Because roof top unit (RTU) air

  15. Test report for K Basin MK I lid removal and replacement system

    SciTech Connect (OSTI)

    Omberg, R.P.; Roe, N.R.

    1996-08-21

    This report provides the results of acceptance testing of sampling equipment for use in the Hanford K Basin. The equipment, MK I Lid Removal/Replacement Tools, were designed to remove/replace MK I Spent Fuel Canister lids so that other equipment may be used to sample the canister contents. The tools were determined to be acceptable for their intended use.

  16. CX-012589: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Subcontractor Replacement of the Roof at Building 773-A, Rooms E172 and E174 CX(s) Applied: B1.3Date: 41829 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  17. CX-012051: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    773-A, E114 Roof Replacement CX(s) Applied: B1.3 Date: 03/24/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  18. Agents for replacement of NAD+/NADH system in enzymatic reactions

    DOE Patents [OSTI]

    Fish, Richard H.; Kerr, John B.; Lo, Christine H.

    2004-04-06

    Novel agents acting as co-factors for replacement of NAD(P).sup.+ /NAD(P)H co-enzyme systems in enzymatic oxido-reductive reactions. Agents mimicking the action of NAD(P).sup.+ /NAD(P)H system in enzymatic oxidation/reduction of substrates into reduced or oxidized products. A method for selection and preparation of the mimicking agents for replacement of NAD(P).sup.+ /NAD(P)H system and a device comprising co-factors for replacement of NAD(P).sup.+ /NAD(P)H system.

  19. Is it Cost-Effective to Replace Old Eddy-Current Drives?

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Is It Cost-Effective to Replace Old Eddy-Current Drives? Electronic pulse-width-modulated (PWM) variable frequency drives (VFD) may be cost- effective replacements for aging or high-maintenance eddy-current drives that are used with variable torque loads, such as centrifugal fans or pumps. However, a VFD may not be a suitable replacement for high-torque, repetitive-slip applications, such as a punch press or a crusher. Eddy-current drives can produce more torque at low speed than an induction

  20. Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving 90 Percent of Annual Costs

    Broader source: Energy.gov [DOE]

    This document, from the U.S. Environmental Protection Agency's ENERGY STAR Residential Program, is part of the Case Study Series, highlighting how "Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving 90 Percent of Annual Costs."

  1. Replace Pressure-Reducing Valves with Backpressure Turbogenerators - Steam Tip Sheet #20

    SciTech Connect (OSTI)

    2012-01-01

    This revised AMO steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  2. Building America Top Innovations 2013 Profile … Window Replacement, Rehabilitation, & Repair Guide

    Energy Savers [EERE]

    Window Replacement, Rehabilitation, & Repair Guide TOP INNOVATOR: BSC Old single-glazed windows have such low thermal resistance that their effect on the overall thermal resistance of the walls can be staggering. Building America recommends several ways to improve the performance of existing windows at varying price points. Owners of older homes who want to improve their homes' efficiency often conclude that window replacement is a necessary first step. They are right that windows can be a

  3. Molecular replacement and model-building using distant homology models as

    Office of Scientific and Technical Information (OSTI)

    templates (Technical Report) | SciTech Connect Molecular replacement and model-building using distant homology models as templates Citation Details In-Document Search Title: Molecular replacement and model-building using distant homology models as templates Authors: Terwilliger, Thomas C. [1] + Show Author Affiliations Los Alamos National Laboratory [Los Alamos National Laboratory Publication Date: 2013-11-26 OSTI Identifier: 1107986 Report Number(s): LA-UR-13-29025 DOE Contract Number:

  4. Replacing a Barrel of Oil with Plants and Microbes (Conference) | SciTech

    Office of Scientific and Technical Information (OSTI)

    Connect Conference: Replacing a Barrel of Oil with Plants and Microbes Citation Details In-Document Search Title: Replacing a Barrel of Oil with Plants and Microbes From Berkeley Lab's Science at the Theater event on May 13th, 2013. Authors: Simmons, Blake Publication Date: 2015-06-09 OSTI Identifier: 1191172 Resource Type: Conference Resource Relation: Conference: Berkeley's Science at the Theater Research Org: LBNL (Lawrence Berkeley National Laboratory (LBNL), Berkeley, CA (United

  5. Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2011 | Department of Energy Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 This paper discusses the so-called "coal train wreck" which may afford an opportunity to modernize our electric utility regulations to reflect a new century of different economic and energy markets, creating opportunities for the utility industry to define a new path to

  6. Fact #568: April 27, 2009 For Modern Cars, Replacing an Air Filter Will

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Improve Performance but Not Fuel Economy | Department of Energy 8: April 27, 2009 For Modern Cars, Replacing an Air Filter Will Improve Performance but Not Fuel Economy Fact #568: April 27, 2009 For Modern Cars, Replacing an Air Filter Will Improve Performance but Not Fuel Economy A February 2009 study conducted by Oak Ridge National Laboratory found that for modern computer-controlled, fuel-injected engines, changing a clogged air filter has no measurable affect on fuel economy but does

  7. The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory

    Energy Savers [EERE]

    Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos National Laboratory OAS-L-13-15 September 2013 Department of Energy Washington, DC 20585 September 26, 2013 MEMORANDUM FOR THE ASSOCIATE ADMINISTRATOR FOR ACQUISITION AND PROJECT MANAGEMENT MANAGER LOS ALAMOS FIELD OFFICE FROM: David Sedillo Western Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Radioactive Liquid Waste Treatment Facility Replacement Project at Los Alamos

  8. CU-Replacement-3 Wholesale Power Rate Schedule | Department of Energy

    Energy Savers [EERE]

    Replacement-3 Wholesale Power Rate Schedule CU-Replacement-3 Wholesale Power Rate Schedule Area: Virginia, North Carolina, Tennessee, Georgia, Alabama, Mississippi, Kentucky, southern Illinois System: CU This rate schedule shall be available to public bodies and cooperatives ( any one of whom is hereinafter called the Customer) in Virginia, North Carolina, Tennessee, Georgia, Alabama, Mississippi, Kentucky and southern Illinois to whom power is provided pursuant to contracts between the

  9. Environmental Assessment for the Replacement Source of Steam for A Area at the Savannah River Site

    Office of Environmental Management (EM)

    68 OCTOBER 2006 U. S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE ENVIRONMENTAL ASSESSMENT FOR THE REPLACEMENT SOURCE OF STEAM FOR A AREA AT THE SAVANNAH RIVER SITE DOE/EA-1568 ENVIRONMENTAL ASSESSMENT FOR THE REPLACEMENT SOURCE OF STEAM FOR A AREA AT THE SAVANNAH RIVER SITE OCTOBER 2006 U. S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE ii TABLE OF CONTENTS Page 1.0 INTRODUCTION

  10. WPN 00-5: Approval of Replacement Refrigerators and Electric Water Heaters

    Broader source: Energy.gov (indexed) [DOE]

    as Allowable Weatherization Measures | Department of Energy Oct. 6, 2000 Provides states with the approval to include refrigerator and electric water heater replacements as an allowable measure. PDF icon WPN 00-5: Approval of Replacement Refrigerators and Electric Water Heaters as Allowable Weatherization Measures More Documents & Publications TEE-0025 - In the Matter of LG Electronics, Inc. EXC-13-0004 - In the Matter of Liebherr Canada Ltd. TEE-0022 - In the Matter of Maytag

  11. Better Buildings Alliance, adidas Case Study: adidas Saves Energy and Costs with Planned RTU Replacement Program (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-09-01

    Case study describing how adidas implemented a best practice of a planned replacement program for its RTUs.

  12. 10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-05-01

    The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification.

  13. Monitoring Galvanic Replacement of Ag Nanoparticles by Pd using Low Dose In

    Office of Scientific and Technical Information (OSTI)

    Situ Liquid S/TEM. (Conference) | SciTech Connect Conference: Monitoring Galvanic Replacement of Ag Nanoparticles by Pd using Low Dose In Situ Liquid S/TEM. Citation Details In-Document Search Title: Monitoring Galvanic Replacement of Ag Nanoparticles by Pd using Low Dose In Situ Liquid S/TEM. Abstract not provided. Authors: Jungjohann, Katherine Leigh Publication Date: 2013-08-01 OSTI Identifier: 1106551 Report Number(s): SAND2013-6522C 465022 DOE Contract Number: AC04-94AL85000 Resource

  14. Magnesium Replacement of Aluminum Cast Components in a Production V6 Engine

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Effect Cost-Effective Mass Reduction | Department of Energy Replacement of Aluminum Cast Components in a Production V6 Engine to Effect Cost-Effective Mass Reduction Magnesium Replacement of Aluminum Cast Components in a Production V6 Engine to Effect Cost-Effective Mass Reduction Presentation given at the 16th Directions in Engine-Efficiency and Emissions Research (DEER) Conference in Detroit, MI, September 27-30, 2010. PDF icon deer10_powell.pdf More Documents & Publications

  15. Reminder: Y-12 Public Warning Siren System being replaced, tested | Y-12

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National Security Complex Reminder: Y-12 Public ... Reminder: Y-12 Public Warning Siren System being replaced, tested Posted: September 25, 2012 - 12:55pm The Y-12 Public Warning Siren System (PWSS) located around the Oak Ridge area is being replaced this month with a test of the new system on Sept. 26. The vendor, American Signal, will be testing the sirens Sept. 26 between 10 a.m. and 2 p.m. They may sound sirens multiple times during this window, and they probably will sound each siren

  16. Fact #596: November 9, 2009 Best and Worst Fuel to Replace Gasoline |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 6: November 9, 2009 Best and Worst Fuel to Replace Gasoline Fact #596: November 9, 2009 Best and Worst Fuel to Replace Gasoline Public opinion surveys from December 2000, August 2004, February 2007 and March 2009 posed this question: Consider a future date when gasoline is no longer available. Which of the following do you think would be the best fuel for use in personal vehicles: electricity, ethanol, or hydrogen? A comparison of the answers from the three different

  17. The How's and Why's of Replacing the Whole Barrel | Department of Energy

    Energy Savers [EERE]

    The How's and Why's of Replacing the Whole Barrel The How's and Why's of Replacing the Whole Barrel October 19, 2011 - 4:09pm Addthis A 42-U.S. gallon barrel of crude oil yields about 45 gallons of petroleum products. Source: Energy Information Administration, “Oil: Crude Oil and Petroleum Products Explained” and Annual Energy Outlook 2009 (Updated February 2010). A 42-U.S. gallon barrel of crude oil yields about 45 gallons of petroleum products. Source: Energy Information

  18. Study: Algae Could Replace 17% of U.S. Oil Imports | Department of Energy

    Energy Savers [EERE]

    Study: Algae Could Replace 17% of U.S. Oil Imports Study: Algae Could Replace 17% of U.S. Oil Imports April 13, 2011 - 6:30pm Addthis Algae samples back at the NREL lab, ready to be analyzed and run through the Fluorescent-Activated Cell Sorter, or FACS, which separates the cells. | Credit: NREL Staff Photographer Dennis Schroeder. Algae samples back at the NREL lab, ready to be analyzed and run through the Fluorescent-Activated Cell Sorter, or FACS, which separates the cells. | Credit: NREL

  19. Webinar: The L Prize-Winning LED A19 Replacement-What Commercial Building

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Owners/Operators Can Expect in 2012 | Department of Energy The L Prize-Winning LED A19 Replacement-What Commercial Building Owners/Operators Can Expect in 2012 Webinar: The L Prize-Winning LED A19 Replacement-What Commercial Building Owners/Operators Can Expect in 2012 This January 18, 2012 webinar presented an update on the status of LED A19 lamp options for commercial businesses, with an overview of DOE's L Prize competition and the rigorous lab, lifetime, and field testing that went into

  20. EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement Project, Malheur County, Oregon

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management, with the Bonneville Power Administration (BPA) as a cooperating agency, prepared an EA that assesses the potential environmental impacts of the proposed authorization of a right of way to the Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA’s proposed action was to fund the project

  1. Conformationally constrained farnesoid X receptor (FXR) agonists: Heteroaryl replacements of the naphthalene

    SciTech Connect (OSTI)

    Bass, Jonathan Y.; Caravella, Justin A.; Chen, Lihong; Creech, Katrina L.; Deaton, David N.; Madauss, Kevin P.; Marr, Harry B.; McFadyen, Robert B.; Miller, Aaron B.; Mills, Wendy Y.; Navas, III, Frank; Parks, Derek J.; Smalley, Jr., Terrence L.; Spearing, Paul K.; Todd, Dan; Williams, Shawn P.; Wisely, G. Bruce

    2014-08-13

    To improve on the drug properties of GSK8062 1b, a series of heteroaryl bicyclic naphthalene replacements were prepared. The quinoline 1c was an equipotent FXR agonist with improved drug developability parameters relative to 1b. In addition, analog 1c lowered body weight gain and serum glucose in a DIO mouse model of diabetes.

  2. The feasibility of replacing or upgrading utility distribution transformers during routine maintenance

    SciTech Connect (OSTI)

    Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

    1995-04-01

    It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

  3. Measure Guideline: Replacing Single-Speed Pool Pumps with Variable Speed Pumps for Energy Savings

    SciTech Connect (OSTI)

    Hunt, A.; Easley, S.

    2012-05-01

    The report evaluates potential energy savings by replacing traditional single-speed pool pumps with variable speed pool pumps, and provide a basic cost comparison between continued uses of traditional pumps verses new pumps. A simple step-by-step process for inspecting the pool area and installing a new pool pump follows.

  4. Measure Guideline. Replacing Single-Speed Pool Pumps with Variable Speed Pumps for Energy Savings

    SciTech Connect (OSTI)

    Hunt, A.; Easley, S.

    2012-05-01

    This measure guideline evaluates potential energy savings by replacing traditional single-speed pool pumps with variable speed pool pumps, and provides a basic cost comparison between continued uses of traditional pumps verses new pumps. A simple step-by-step process for inspecting the pool area and installing a new pool pump follows.

  5. Promoting plumbing fixture and fitting replacement: Recommendations and review for state and local water resource authorities

    SciTech Connect (OSTI)

    Dunham, C.; Lutz, J.D.; Pickle, S.J.

    1995-06-01

    Lawrence Berkeley National Laboratory (LBNL) has prepared this report to facilitate compliance with the requirements of Section 123 of the Energy Policy Act of 1992 (EPACT). Section 123 requires the Department of Energy to issue recommendations for establishing state and local incentive programs to encourage acceleration of voluntary consumer replacement of existing water closets, urinals, showerheads and faucets with water-saving products meeting EPACT standards. The authors recommend that state and local authorities working together and also with utilities: (A) investigate the cost-effectiveness of voluntary replacement of plumbing fixtures and fittings as an effective component of a water efficiency incentive program; (B) allow utilities to distribute the costs of water saving products by billing at pre-installation rates until devices have been paid for; (C) encourage decreased water usage by establishing rate structures such as increasing block rates or seasonal pricing; (D) add additional incentive to rebate programs by making the rebates untaxable income. (E) require municipalities or utilities to exhaust every reasonable method of water conservation before applying for permits to construct water supply or water treatment systems; (F) require high-efficiency toilets, urinals, showerheads, and faucets in new construction and changing plumbing codes to incorporate different pipe sizing needs; and (G) and mandate installation of meters to correctly measure water consumption. Following the introduction, a general overview of these recommendations is presented. Each recommendation is discussed briefly. After determining the cost-effectiveness of a plumbing replacement program (or plumbing replacement aspect of a larger program) states can encourage replacement of toilets, urinals, showerheads, and faucets in a number of ways. This report lists both legislative and economic measures that can be implemented on the state level that impact local programs.

  6. 10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement

    SciTech Connect (OSTI)

    Noel Duckwtiz

    2011-05-01

    Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.

  7. Construction and operation of replacement hazardous waste handling facility at Lawrence Berkeley Laboratory. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0423, for the construction and operation of a replacement hazardous waste handling facility (HWHF) and decontamination of the existing HWHF at Lawrence Berkeley Laboratory (LBL), Berkeley, California. The proposed facility would replace several older buildings and cargo containers currently being used for waste handling activities and consolidate the LBL`s existing waste handling activities in one location. The nature of the waste handling activities and the waste volume and characteristics would not change as a result of construction of the new facility. Based on the analysis in the EA, DOE has determined that the proposed action would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC. 4321 et seq. Therefore, an environmental impact statement is not required.

  8. Compliant mechanism road bicycle brake: a rigid-body replacement case study

    SciTech Connect (OSTI)

    Olsen, Brian M; Howell, Larry L; Magleby, Spencer P

    2011-01-19

    The design of high-performance bicycle brakes is complicated by the competing design objectives of increased performance and low weight. But this challenge also provides a good case study to demonstrate the design of compliant mechanisms to replace current rigid-link mechanisms. This paper briefly reviews current road brake designs, demonstrates the use of rigid-body replacement synthesis to design a compliant mechanism, and illustrates the combination of compliant mechanism design tools. The resulting concept was generated from the modified dual-pivot brake design and is a partially compliant mechanism where one pin has the dual role of a joint and a mounting pin. The pseudo-rigid-body model, finite element analysis, and optimization algorithms are used to generate design dimensions, and designs are considered for both titanium and E-glass flexures. The resulting design has the potential of reducing the part count and overall weight while maintaining a performance similar to the benchmark.

  9. Bio-based photosynthetic conversion of CO2 and water to replace petroleum

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    feedstock on an industrial scale - Energy Innovation Portal Early Stage R&D Early Stage R&D Biomass and Biofuels Biomass and Biofuels Find More Like This Return to Search Bio-based photosynthetic conversion of CO2 and water to replace petroleum feedstock on an industrial scale National Renewable Energy Laboratory Contact NREL About This Technology Technology Marketing Summary Alpha-ketoglutarate (AKG) is widely used as an organic synthesis intermediate, a medical and biochemical

  10. 5-Carbon Alcohols for Drop-in Gasoline Replacement - Energy Innovation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Portal Vehicles and Fuels Vehicles and Fuels Biomass and Biofuels Biomass and Biofuels Find More Like This Return to Search 5-Carbon Alcohols for Drop-in Gasoline Replacement Lawrence Berkeley National Laboratory Contact LBL About This Technology Technology Marketing SummaryJay Keasling and Howard Chou of Berkeley Lab and the Joint BioEnergy Institute (JBEI) have invented a fermentation process to produce 5-carbon alcohols from genetically modified E. coli host cells regardless of the

  11. Replace V-Belts with Notched or Synchronous Belt Drives | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy V-Belts with Notched or Synchronous Belt Drives Replace V-Belts with Notched or Synchronous Belt Drives Belt drives provide flexibility in the positioning of the motor relative to the load. Pulleys (sheaves) of varying diameters allow the speed of the driven equipment to be increased or decreased relative to the motor speed. A properly designed belt power-transmission system offers high efficiency and low noise, requires no lubrication, and presents low maintenance requirements.

  12. A Safer Replacement for Highly Flammable Liquids Currently Used in Li-ion

    Office of Science (SC) Website

    Batteries | U.S. DOE Office of Science (SC) A Safer Replacement for Highly Flammable Liquids Currently Used in Li-ion Batteries Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) SBIR/STTR Home About Funding Opportunity Announcements (FOAs) Applicant and Awardee Resources Commercialization Assistance Other Resources Awards SBIR/STTR Highlights Reporting Fraud Contact Information Small Business Innovation Research and Small Business Technology Transfer

  13. Bio-based ethylene able to replace petroleum as a feedstock - Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Innovation Portal Early Stage R&D Early Stage R&D Biomass and Biofuels Biomass and Biofuels Find More Like This Return to Search Bio-based ethylene able to replace petroleum as a feedstock National Renewable Energy Laboratory Contact NREL About This Technology Publications: PDF Document Publication Photosynthetic Conversion of CO2 to Fuels and Chemicals using Cyanobacteria - Accelerating Innovation Webinar Presentation (989 KB) Technology Marketing Summary Ethylene is the most

  14. Cost-Effective Replacement for Iodide in Dye-Sensitized Solar Cells -

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Innovation Portal Solar Photovoltaic Solar Photovoltaic Find More Like This Return to Search Cost-Effective Replacement for Iodide in Dye-Sensitized Solar Cells Colorado State University Contact CSU About This Technology Publications: PDF Document Publication Electron Transfer Mediator Summary (236 KB) Cross-section of solar cell Cross-section of solar cell Technology Marketing SummaryDye-sensitized solar cells (DSSCs) are used to create electrical energy from sunlight. The cell has

  15. Measure Guideline: Replacing Single-Speed Pool Pumps with Variable Speed Pumps for Energy Savings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Replacing Single-Speed Pool Pumps with Variable Speed Pumps for Energy Savings A. Hunt and S. Easley Building America Retrofit Alliance (BARA) May 2012 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, subcontractors, or affiliated partners makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy,

  16. Quenching and Partitioning Process Development to Replace Hot Stamping of High-Strength Automotive Steel

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quenching and Partitioning Process ADVANCED MANUFACTURING OFFICE Quenching and Partitioning Process Development to Replace Hot Stamping of High-Strength Automotive Steel Novel Steel Heat Treatment Process to Produce Third Generation AHSS Allowing Room-Temperature Stamping Operations. The automotive industry is meeting the challenge of improving fuel effciency without compromising vehicle safety in part by using lighter-weight materials such as frst-generation Advanced High-Strength Steels

  17. Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving 90 Percent of Annual Costs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Residential Program U.S. Environmental Protection Agency 
 
 November 2009 Case Study Series-Demonstrating Value of Program Evaluation 
 Evaluation Prompts ENERGY STAR Program to Replace Web Tool, Saving 90 Percent of Annual Costs A program within the U.S. Environmental Protection Agency (EPA) is saving $90,000 per year on its online energy audit tool after an evaluation prompted managers to scale back its features. The Home Energy Advisor collects information from homeowners and makes

  18. Replaces EIA-459B U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE MILESTONE PLAN

    Energy Savers [EERE]

    (03-94) Replaces EIA-459B U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE MILESTONE PLAN OMB Control No. 1910-0400 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,

  19. Replaces EIA-459C All Other Editions Are Obsolete OMB Control No.

    Energy Savers [EERE]

    4600.4 (04-94) Replaces EIA-459C All Other Editions Are Obsolete OMB Control No. 1910-0400 U.S. Department of Energy Federal Assistance Budget Information Public reporting burden for this collection of information is estimated to average 1.87 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any

  20. Replaces EIA-459F All Other Editions Are Obsolete OMB Control No.

    Energy Savers [EERE]

    6 (10-94) Replaces EIA-459F All Other Editions Are Obsolete OMB Control No. 1910-0400 U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE PROGRAM/PROJECT STATUS REPORT Public reporting burden for this collection of information is estimated to average 47.5 hours per response, including the time for reviewing instructions, search- ing existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate

  1. Technology Solutions Case Study: Replacement of Variable-Speed Motors for Furnaces

    SciTech Connect (OSTI)

    2013-02-01

    In conjunction with the New York State Energy Research and Development Authority (NYSERDA) and Proctor Engineering Group, Ltd. (PEG), the Consortium for Advanced Residential Buildings (CARB) evaluated the Concept 3 replacement motors for residential furnaces in eight homes in Syracuse, NY. These brushless, permanent magnet (BPM) motors can use much less electricity than their PSC (permanent split capacitor) predecessors. This evaluation focuses on existing homes in the heating-dominated climate of upstate New York with the goals of characterizing field performance and cost-effectiveness. The results of this study are intended to be useful to home performance contractors, HVAC contractors, and home efficiency program stakeholders. Tests and monitoring was performed both before and after fan motors were replaced. Average fan power reductions were approximately 126 Watts during heating and 220 Watts during cooling operation. Over the course of entire heating and cooling seasons, these translated into average electric energy savings of 163 kWh, with average cost savings of $20 per year. Homes where the fan was used outside of heating and cooling mode saved an additional $42 per year on average. Results indicate that BPM replacement motors will be most cost-effective in HVAC systems with longer run times and relatively low duct static pressures. More dramatic savings are possible if occupants use the fan-only setting when there is no thermal load.

  2. 10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-05-01

    The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the 50-year-old obsolescent marine diesels with commercial power that is backed with safety related emergency diesel generators, switchgear, and uninterruptible power supply (UPS). The second project, the subject of this major modification determination, will replace the four, obsolete, original primary coolant pumps (PCPs) and motors. Completion of this and the two other age-related projects (replacement of the ATR diesel bus [E-3] and switchgear and replacement of the existent emergency firewater injection system) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification: 1. Evaluation Criteria #3 (Change of existing process). The proposed strategy for equipping the replacement PCPs with VFDs and having the PCPs also function as ECPs will require significant safety basis changes requiring DOE approval. 2. Evaluation Criteria #4 (Use of new technology). The use of VFD and VFD “pump catcher” technology for the PCPs is not currently in use and has not been previously formally reviewed/approved by DOE for ATR. It is noted that VFD technology has several decades of commercial use and experience. However, the ATR probabilistic risk assessment will have to be updated, reflecting the changes for supplying ECP flows including VFD reliability, to confirm that the proposed activity maintains or reduces the CDF for the ATR. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). It is expected that the proposed activity will result in a revised list of safety-related SSCs. Specifically, as currently proposed, the existing ECPs will be deleted from the list. The PCPs and their associated components, picking up the ECP function, will be classified as safety-related active Seismic Category I.

  3. 10 CFR 830 Major Modification Determination for Advanced Test Reactor RDAS and LPCIS Replacement

    SciTech Connect (OSTI)

    David E. Korns

    2012-05-01

    The replacement of the ATR Control Complex's obsolete computer based Reactor Data Acquisition System (RDAS) and its safety-related Lobe Power Calculation and Indication System (LPCIS) software application is vitally important to ensure the ATR remains available to support this national mission. The RDAS supports safe operation of the reactor by providing 'real-time' plant status information (indications and alarms) for use by the reactor operators via the Console Display System (CDS). The RDAS is a computer support system that acquires analog and digital information from various reactor and reactor support systems. The RDAS information is used to display quadrant and lobe powers via a display interface more user friendly than that provided by the recorders and the Control Room upright panels. RDAS provides input to the Nuclear Engineering ATR Surveillance Data System (ASUDAS) for fuel burn-up analysis and the production of cycle data for experiment sponsors and the generation of the Core Safety Assurance Package (CSAP). RDAS also archives and provides for retrieval of historical plant data which may be used for event reconstruction, data analysis, training and safety analysis. The RDAS, LPCIS and ASUDAS need to be replaced with state-of-the-art technology in order to eliminate problems of aged computer systems, and difficulty in obtaining software upgrades, spare parts, and technical support. The major modification criteria evaluation of the project design did not lead to the conclusion that the project is a major modification. The negative major modification determination is driven by the fact that the project requires a one-for-one equivalent replacement of existing systems that protects and maintains functional and operational requirements as credited in the safety basis.

  4. Lumen Maintenance Testing of the Philips 60-Watt Replacement Lamp L Prize Entry

    SciTech Connect (OSTI)

    Gordon, Kelly L.; Hafen, Ryan P.; Hathaway, John E.; McCullough, Jeffrey J.

    2012-09-01

    This paper describes testing conducted to evaluate the Philips' L Prize award winning 60-watt LED replacement product's ability to meet the lifetime/lumen maintenance requirement of the competition, which was: "having 70 percent of the lumen value under subparagraph (A) [producing a luminous flux greater than 900 lumens] exceeding 25,000 hours under typical conditions expected in residential use." A custom test apparatus was designed and constructed for this testing and a statistical approach was developed for use in evaluating the test results. This will be the only publicly available, third-party data set of long-term LED product operation.

  5. Replaces DOE F 3530.1 5. HOW LONG IN PRESENT POSITION GRADE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    50.2 (07-95) Replaces DOE F 3530.1 5. HOW LONG IN PRESENT POSITION GRADE 6. DATE NEXT REGULAR STEP INCREASE IS DUE: 7. LIST ANY AWARDS OR QUALITY INCREASES RECEIVED IN LAST 5 YEARS (Date and kind of award) ATTACH A COMPLETED SF-52, "REQUEST FOR PERSONNEL ACTION," AND A COPY OF THE EMPLOYEE'S CURRENT RATING OF RECORD AS DOCUMENTATION THAT PERFORMANCE HAS MET ALL THE REQUIREMENTS FOR AN OUTSTANDING RATING. NAME AND TITLE OF NOMINATING OFFICIAL (Employee's immediate supervisor) 1. NAME OF

  6. Replacing the Whole BarrelTo Reduce U.S. Dependence on Oil

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Replacing the Whole Barrel To Reduce U.S. Dependence on Oil July 2013 Biofuels are improving America's energy security and helping to lower prices at the pump. Photo: iStock/ 3295439. Cover photos from iStock/ 13311982, 8047298, 6019274, 16059398, 6439341 If we are going to control our energy future, then we've got to have an all-of-the-above strategy. We've got to develop every source of American energy-not just oil and gas, but wind power and solar power, nuclear power, biofuels. President

  7. Microsoft PowerPoint - 2014 HydroPower - Stockton Turbine Replacement June 2014 [Compatibility Mode]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Replacement Hydropower Conference Tulsa, OK Pete Hentschel, Hydropower Business Line Mgr Robin Wankum, Project Manager Kansas City District Tulsa, OK Kansas City District 18 June 2014 US Army Corps of Engineers BUILDING STRONG ® General Plant Information  Originally Rated 45 MW & Operated @ 50 MW U d d t t t 52 MW ► Upgraded to operate at 52 MW  Single vertical axis Kaplan unit ► New turbine runner has 7 blades versus 6 on the old runner ► New turbine runner has 7 blades versus

  8. Replace Pressure-Reducing Valves with Backpressure Turbogenerators (International Fact Sheet), Energy Tips-Steam, Steam Tip Sheet #20c

    SciTech Connect (OSTI)

    Not Available

    2010-10-01

    This English/Chinese ITP steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  9. Should a coal-fired power plant be replaced or retrofitted?

    SciTech Connect (OSTI)

    Dalia Patino-Echeverri; Benoit Morel; Jay Apt; Chao Chen

    2007-12-15

    In a cap-and-trade system, a power plant operator can choose to operate while paying for the necessary emissions allowances, retrofit emissions controls to the plant, or replace the unit with a new plant. Allowance prices are uncertain, as are the timing and stringency of requirements for control of mercury and carbon emissions. We model the evolution of allowance prices for SO{sub 2}, NOx, Hg, and CO{sub 2} using geometric Brownian motion with drift, volatility, and jumps, and use an options-based analysis to find the value of the alternatives. In the absence of a carbon price, only if the owners have a planning horizon longer than 30 years would they replace a conventional coal-fired plant with a high-performance unit such as a supercritical plant; otherwise, they would install SO{sub 2} and NOx controls on the existing unit. An expectation that the CO{sub 2} price will reach $50/t in 2020 makes the installation of an IGCC with carbon capture and sequestration attractive today, even for planning horizons as short as 20 years. A carbon price below $40/t is unlikely to produce investments in carbon capture for electric power. 1 ref., 5 figs., 2 tabs.

  10. Replacement of chlorofluorocarbons (CFCs) at the DOE Gaseous Diffusion Plants: An assessment of global impacts

    SciTech Connect (OSTI)

    Socolof, M.L.; Saylor, R.E.; McCold, L.N.

    1994-12-31

    The US Department of Energy (DOE) operates two uranium enrichment plants. Together, the two plants maintain an inventory of approximately 14 million pounds of a chlorofluorocarbon (CFC), dichlorote-trafluoroethane (CFC-114) as a coolant. Annual operational CFC-114 losses total over 500,000 pounds. In February, 1992, President Bush announced that the US would terminate manufacture and importation of Class 1 ozone depleting substances (including CFC-114) by the end of 1995. To comply with this requirement DOE has considered introducing a replacement coolant by the end of 1995. Two perfluorocarbons (PFCs) - namely, octofluoro-cyclobutane and decafluorobutane - are presently the only known coolants that could meet safety requirements. They would not contribute to stratospheric ozone depletion but contribute to global warming. The paper describes an analysis of the potential global impacts of the proposed replacement of CFC-114 with a PFC. A problem with analyses of global warming and ozone depletion impacts is that even large sources of compounds that contribute to these effects contribute only very small fractions of the total effect. The authors take the position that significant effects to global warming and ozone depletion have already occurred, and that any additional contribution to these effects are contributions to cumulatively significant adverse effects on the environment. The paper describes four alternatives and the extent to which each would contribute to global warming and ozone depletion.

  11. Decontamination and decommissioning of 61 plutonium gloveboxes in D-Wing, Building 212 Argonne National Laboratory-East: Final project report

    SciTech Connect (OSTI)

    Cheever, C.L.; Rose, R.W.

    1996-09-01

    Argonne National Laboratory-East (ANL-E) is a government-owned, contractor operated, multipurpose research facility located 25 miles southwest of downtown Chicago on 689 hectares (1,700 acres) in DuPage County, Illinois, as shown in Figure 1.1. Building 212 is located in the central area of ANL-E, as shown in Figure 1.2. The purpose of this project was to eliminate the risk of radioactive material release from the contaminated glovebox systems and to make the laboratories available for unrestricted use. The following work objectives were established: (1) Identify and remove radioactive materials for return to ANL-E Special Materials control. (2) Remove and package the radioactively contaminated materials and equipment from the gloveboxes. (3) Decontaminate the gloveboxes to nontransuranic (non-TRU) levels. (4) Size-reduce and package the gloveboxes and support systems. (5) Document and dispose of the radioactive and mixed waste. (6) Decontaminate, survey, and release the nine laboratories and corridor areas for unrestricted use.

  12. ARM: Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Karen Johnson; Nitin Bharadwaj

    1990-01-01

    Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

  13. Replacing Resistance Heating with Mini-Split Heat Pumps, Sharon, Connecticut (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-05-01

    Mini-split heat pumps can provide space heating and cooling in many climates and are relatively affordable. These and other features make them potentially suitable for retrofitting into multifamily buildings in cold climates to replace electric resistance heating or other outmoded heating systems. This report investigates the suitability of mini-split heat pumps for multifamily retrofits. Various technical and regulatory barriers are discussed and modeling was performed to compare long-term costs of substituting mini-splits for a variety of other heating and cooling options. A number of utility programs have retrofit mini-splits in both single family and multifamily residences. Two such multifamily programs are discussed in detail.

  14. Lessons learned from reheater replacements TVA Gallatin Fossil Plant units 1 and 2

    SciTech Connect (OSTI)

    Chang, P.S.; Stangarone, R.J.

    1996-07-01

    Gallatin Units 1 and 2 have experienced a long history of problems in the reheat front inlet platens and front outlet pendants. Cracks were discovered at lug welds on the reheat inlet platen assemblies after six years of operation. During the next ten years cracking at lugs continued to be a problem in both the inlet platen and front outlet assemblies. Solutions included changing tube material and spacing, and redesigning lugs. None of the solutions were successful. In 1980, a fuel switch to washed coal was made to reduce boiler slagging. Within two years of the fuel change, liquid phase corrosion began to attack the tubes. The corrosion became severe and elements were replaced at seven year intervals. During this time, EPRI sought utilities with boilers experiencing liquid phase corrosion to test new corrosion resistant materials. Gallatin Unit 2 was selected as one of the test units. Probes containing a number of different alloys were inserted into the furnace and subjected to the corrosion attacks. After a five year study, HR3C was selected as the alloy from which to build a complete set of elements for further testing. Reheat assemblies were manufactured from HR3C and installed in Unit 2 and Unit 1 Shortly after Unit 1 returned to service, swages between the front pendant and inlet platen elements failed by brittle fracture due to the cold swaging operation used in fabrication. Cracks were discovered after two years of operation at the tube to lug welds and the new elements were experiencing the same liquid phase corrosion as in the past. The attempt to resolve the liquid phase corrosion problem in Gallatin Units 1 and 2 pendant reheater revealed that past replacements did not address the root cause of the problems. HR3C is a relatively brittle material and manufacturers used traditional methods to design and fabricate the elements. Inadequate fabrication and erection procedures have led to several in-service problems not associated with liquid phase corrosion.

  15. Use of Brazilian sugarcane bagasse ash in concrete as sand replacement

    SciTech Connect (OSTI)

    Sales, Almir; Lima, Sofia Araujo

    2010-06-15

    Sugarcane today plays a major role in the worldwide economy, and Brazil is the leading producer of sugar and alcohol, which are important international commodities. The production process generates bagasse as a waste, which is used as fuel to stoke boilers that produce steam for electricity cogeneration. The final product of this burning is residual sugarcane bagasse ash (SBA), which is normally used as fertilizer in sugarcane plantations. Ash stands out among agroindustrial wastes because it results from energy generating processes. Many types of ash do not have hydraulic or pozzolanic reactivity, but can be used in civil construction as inert materials. The present study used ash collected from four sugar mills in the region of Sao Carlos, SP, Brazil, which is one of the world's largest producers of sugarcane. The ash samples were subjected to chemical characterization, sieve analysis, determination of specific gravity, X-ray diffraction, scanning electron microscopy, and solubilization and leaching tests. Mortars and concretes with SBA as sand replacement were produced and tests were carried out: compressive strength, tensile strength and elastic modulus. The results indicated that the SBA samples presented physical properties similar to those of natural sand. Several heavy metals were found in the SBA samples, indicating the need to restrict its use as a fertilizer. The mortars produced with SBA in place of sand showed better mechanical results than the reference samples. SBA can be used as a partial substitute of sand in concretes made with cement slag-modified Portland cement.

  16. Replacement of chlorofluorocarbons at the DOE gaseous diffusion plants: An assessment of global impacts

    SciTech Connect (OSTI)

    Socolof, M.L.; McCold, L.N.; Saylor, R.E.

    1997-01-01

    Three gaseous diffusion plants (GDPs) for enriching uranium maintain a large inventory of chlorofluorocarbon-114 (CFC-114) as a coolant. To address the continued use of CFC-114, an ozone-depleting substance, the US Department of Energy (DOE) considered introducing perfluorocarbons (PFCs) by the end of 1995. These PFCs would not contribute to stratospheric ozone depletion but would be larger contributors to global warming than would CFC-114. The paper reports the results of an assessment of the global impacts of four alternatives for modifying GDP coolant system operations over a three-year period beginning in 1996. The overall contribution of GDP coolant releases to impacts on ozone depletion and global warming were quantified by parameters referred to as ozone-depletion impact and global-warming impact. The analysis showed that these parameters could be used as surrogates for predicting global impacts to all resources and could provide a framework for assessing environmental impacts of a permanent coolant replacement, eliminating the need for subsequent resource-specific analyses.

  17. Building America Case Study: Boiler Control Replacement for Hydronically Heated Multifamily Buildings, Cambridge, Massachusetts (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-11-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency. Efficient operation of the heating system faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68 degrees F) than day (73 degrees F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

  18. Technology Solutions Case Study: Boiler Control Replacement for Hydronically Heated Multifamily Buildings, Cambridge, Massachusetts

    SciTech Connect (OSTI)

    2014-11-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency, which faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68F) than day (73 F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

  19. Methods for disassembling, replacing and assembling parts of a steam cooling system for a gas turbine

    DOE Patents [OSTI]

    Wilson, Ian D. (Mauldin, SC); Wesorick, Ronald R. (Albany, NY)

    2002-01-01

    The steam cooling circuit for a gas turbine includes a bore tube assembly supplying steam to circumferentially spaced radial tubes coupled to supply elbows for transitioning the radial steam flow in an axial direction along steam supply tubes adjacent the rim of the rotor. The supply tubes supply steam to circumferentially spaced manifold segments located on the aft side of the 1-2 spacer for supplying steam to the buckets of the first and second stages. Spent return steam from these buckets flows to a plurality of circumferentially spaced return manifold segments disposed on the forward face of the 1-2 spacer. Crossover tubes couple the steam supply from the steam supply manifold segments through the 1-2 spacer to the buckets of the first stage. Crossover tubes through the 1-2 spacer also return steam from the buckets of the second stage to the return manifold segments. Axially extending return tubes convey spent cooling steam from the return manifold segments to radial tubes via return elbows. The bore tube assembly, radial tubes, elbows, manifold segments and crossover tubes are removable from the turbine rotor and replaceable.

  20. Replacement of Lighting Fixtures with LED Energy Efficient Lights at the Parking Facility, Milwaukee, Wisconsin

    SciTech Connect (OSTI)

    David Brien

    2012-06-21

    The Forest County Potawatomi Community (FCPC or Tribe) owns a six-story parking facility adjacent to its Potawatomi Bingo Casino (the Casino) in Milwaukee, Wisconsin, as well as a valet parking facility under the Casino (collectively, the Parking Facility). The Parking Facility contained 205-watt metal halide-type lights that, for security reasons, operated 24 hours per day, 7 days per week. Starting on August 30, 2010, the Tribe replaced these fixtures with 1,760 state-of-the-art, energy efficient 55-Watt LED lights. This project resulted in an immediate average reduction in monthly peak demand of 238 kW over the fourth quarter of 2010. The average reduction in monthly peak demand from October 1 through December 31, 2010 translates into a forecast annual electrical energy reduction of approximately 1,995,000 kWh or 47.3% of the pre-project demand. This project was technically effective, economically feasible, and beneficial to the public not only in terms of long term energy efficiency and associated emissions reductions, but also in the short-term jobs provided for the S.E. Wisconsin region. The project was implemented, from approval by U.S. Department of Energy (DOE) to completion, in less than 6 months. The project utilized off-the-shelf proven technologies that were fabricated locally and installed by local trade contractors.

  1. Renewed interest in prop supports as a replacement for wood cribs

    SciTech Connect (OSTI)

    Barczak, T.M.; Gearhart, D.F.

    1995-11-01

    Wood cribs have been the dominant form of supplemental support in coal mining for many years. Recently, there has been a renewed interest in prop supports as a replacement for wood cribbing due to the increasing cost of mine timber and engineering advancements in prop design to improve their stability and yield capability. Prop supports generally consume less material, can be installed in less time with less labor, and provide less restriction to mine ventilation than wood crib supports. Several prop supports are now available or under development. These include: (1) Strata Products Propsetter{trademark} Support System, (2) Heintzmann ACS and Super Prop; (3) MBK-Hydraulik MEGA prop; (4) Advanced Mining Technology Inc. (AMTI) BTS Mortar prop; (5) Dywidag Coal Post; (6) Western Support Systems YIPPI support; and (7) ``The Can`` support by Burrell Mining Products. A comparison of the performance and cost of these support systems to wood cribs is made to provide mine operators with information needed to underground installations are discussed. Included in this assessment are full scale tests of these supports conducted in the US Bureau of Mines` Mine Roof Stimulator.

  2. Hydronic Heating Retrofits for Low-Rise Multifamily Buildings: Boiler Control Replacement and Monitoring

    SciTech Connect (OSTI)

    Dentz, J.; Henderson, H.; Varshney, K.

    2014-09-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency. Efficient operation of the heating system faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68 degrees F) than day (73 degrees F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

  3. Formation of Pd/Au Nanostructures from Pd Nanowires via Galvanic Replacement Reaction

    SciTech Connect (OSTI)

    Teng,X.; Wang, Q.; Liu, P.; Han, W.; Frenkel, A.; Wen, W.; Marinkovic, N.; Hanson, J.; Rodriguez, J.

    2008-01-01

    Bimetallic nanostructures with non-random metal atoms distribution are very important for various applications. To synthesize such structures via benign wet chemistry approach remains challenging. This paper reports a synthesis of a Au/Pd alloy nanostructure through the galvanic replacement reaction between Pd ultrathin nanowires (2.4 {+-} 0.2 nm in width, over 30 nm in length) and AuCl3 in toluene. Both morphological and structural changes were monitored during the reaction up to 10 h. Continuous changes of chemical composition and crystalline structure from Pd nanowires to Pd68Au32 and Pd45Au55 alloys, and to Au nanoparticles were observed. More interestingly, by using combined techniques such as high-resolution transmission electron microscopy (HRTEM), X-ray diffraction (XRD), energy dispersive X-ray spectrometry (EDS), UV-vis absorption, and extended X-ray absorption fine structure (EXAFS) spectroscopy, we found the formation of Pd68Au32 non-random alloy with Au-rich core and Pd-rich shell, and random Pd45Au55 alloy with uniformly mixed Pd and Au atom inside the nanoparticles, respectively. Density functional theory (DFT) calculations indicated that alkylamine will strongly stabilize Pd to the surface, resulting in diffusion of Au atoms into the core region to form a non-random alloy. We believe such benign synthetic techniques can also enable the large scale preparation of various types of non-random alloys for several technically important catalysis applications.

  4. Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-06-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, Program and Project Management for the Acquisition of Capital Assets, safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, Facility Safety, and the expectations of DOE-STD-1189-2008, Integration of Safety into the Design Process, provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  5. Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-06-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, Program and Project Management for the Acquisition of Capital Assets, safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, Facility Safety, and the expectations of DOE-STD-1189-2008, Integration of Safety into the Design Process, provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  6. Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project

    SciTech Connect (OSTI)

    Noel Duckwitz

    2011-06-01

    In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, Program and Project Management for the Acquisition of Capital Assets, safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, Facility Safety, and the expectations of DOE-STD-1189-2008, Integration of Safety into the Design Process, provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

  7. Simulation Analyses in Support of DOEs Fossil Fuel Rule for Single Component Equipment and Lighting Replacements

    SciTech Connect (OSTI)

    Halverson, Mark A.; Wang, Weimin

    2013-10-16

    At the request of DOEs Federal Energy Management Program (FEMP), Pacific Northwest National Laboratory (PNNL) conducted a series of building energy simulations using a large office model to investigate the potential savings that could be accrued from a typical chiller, boiler, or lighting replacement in a Federal office building.

  8. Design Tools to Assess Hydro-Turbine Biological Performance: Priest Rapids Dam Turbine Replacement Project

    SciTech Connect (OSTI)

    Richmond, Marshall C.; Rakowski, Cynthia L.; Serkowski, John A.; Strickler, Brad; Weisbeck, Molly; Dotson, Curtis L.

    2013-06-25

    Over the past two decades, there have been many studies describing injury mechanisms associated with turbine passage, the response of various fish species to these mechanisms, and the probability of survival through dams. Although developing tools to design turbines that improve passage survival has been difficult and slow, a more robust quantification of the turbine environment has emerged through integrating physical model data, fish survival data, and computational fluid dynamics (CFD) studies. Grant County Public Utility District (GCPUD) operates the Priest Rapids Dam (PRD), a hydroelectric facility on the Columbia River in Washington State. The dam contains 10 Kaplan-type turbine units that are now almost 50 years old. The Utility District plans to refit all of these aging turbines with new turbines. The Columbia River at PRD is a migratory pathway for several species of juvenile and adult salmonids, so passage of fish through the dam is a major consideration when replacing the turbines. In this presentation, a method for turbine biological performance assessment (BioPA) is introduced. Using this method, a suite of biological performance indicators is computed based on simulated data from a CFD model of a proposed turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. Using known relationships between the dose of an injury mechanism and frequency of injury (dose–response) from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from proposed designs, the engineer can identify the more-promising alternatives. We will present application of the BioPA method for baseline risk assessment calculations for the existing Kaplan turbines at PRD that will be used as the minimum biological performance that a proposed new design must achieve.

  9. Stress Testing of the Philips 60W Replacement Lamp L Prize Entry

    SciTech Connect (OSTI)

    Poplawski, Michael E.; Ledbetter, Marc R.; Smith, Mark

    2012-04-24

    The Pacific Northwest National Laboratory, operated by Battelle for the U.S. Department of Energy, worked with Intertek to develop a procedure for stress testing medium screw-base light sources. This procedure, composed of alternating stress cycles and performance evaluation, was used to qualitatively compare and contrast the durability and reliability of the Philips 60W replacement lamp L Prize entry with market-proven compact fluorescent lamps (CFLs) with comparable light output and functionality. The stress cycles applied simultaneous combinations of electrical, thermal, vibration, and humidity stresses of increasing magnitude. Performance evaluations measured relative illuminance, x chromaticity and y chromaticity shifts after each stress cycle. The Philips L Prize entry lamps appear to be appreciably more durable than the incumbent energy-efficient technology, as represented by the evaluated CFLs, and with respect to the applied stresses. Through the course of testing, all 15 CFL samples permanently ceased to function as a result of the applied stresses, while only 1 Philips L Prize entry lamp exhibited a failure, the nature of which was minor, non-destructive, and a consequence of a known (and resolved) subcontractor issue. Given that current CFL technology appears to be moderately mature and no Philips L Prize entry failures could be produced within the stress envelope causing 100 percent failure of the benchmark CFLs, it seems that, in this particular implementation, light-emitting diode (LED) technology would be much more durable in the field than current CFL technology. However, the Philips L Prize entry lamps used for testing were carefully designed and built for the competition, while the benchmark CFLs were mass produced for retail salea distinction that should be taken into consideration. Further reliability testing on final production samples would be necessary to judge the extent to which the results of this analysis apply to production versions of the Philips L Prize entry.

  10. Project Plan 7930 Cell G PaR Remote Handling System Replacement

    SciTech Connect (OSTI)

    Kinney, Kathryn A

    2009-10-01

    For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ({sup 252}Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for {sup 252}Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for {sup 252}Cf processing in Building 7930, Cell G require use of through-the-wall manipulators and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully functioning and reliable Par manipulator arm is necessary for uninterrupted {sup 252}Cf operations; a fully-functioning bridge is needed for the system to function as intended.

  11. The manufacture of replacement low pressure carrier casings and associated stationary guide vane blading through on site component sample measurement

    SciTech Connect (OSTI)

    Fraser, M.J.

    1996-12-31

    In today`s competitive utility market place, the manufacture of replacement components by alternate manufacturing has become an increasingly important available option for turbine operators seeking to achieve substantive cost and lead time reductions in spare part purchasing. Essential to this strategy--in the absence of a total redesign of the component(s) or their assemblies--is the provision or access to the selected alternate manufacture of the necessary sample parts. This paper details the manufacture by reverse engineering of 3 replacement low pressure carrier guide vane blade casings for a 60 MW steam turbine complete with their associated blading and ancillary parts where the necessary sample parts and assemblies could not be released from site due to outage constraints.

  12. EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

  13. Microsoft Word - FINAL CR 2013-01 Soil Disturbance Review Plan - GS10 Flume Replacement.doc

    Office of Legacy Management (LM)

    RFLMA Contact Record 2013-01 1 of 11 ROCKY FLATS SITE REGULATORY CONTACT RECORD Purpose: GS10 Flume Replacement Project and Soil Disturbance Review Plan Contact Record Approval Date: May 2, 2013 Site Contact(s)/Affiliation(s): Scott Surovchak, U.S. Department of Energy (DOE); Rick DiSalvo, S.M. Stoller Corporation (Stoller); Linda Kaiser, Stoller; George Squibb, Stoller Regulatory Contact(s)/Affiliation(s): Carl Spreng, Colorado Department of Public Health and Environment (CDPHE); Vera Moritz,

  14. Trim or Replace Impellers on Oversized Pumps: Industrial Technologies Program (ITP) Pumping Systems Tip Sheet #7 (Fact Sheet)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 * September 2006 Trim or Replace Impellers on Oversized Pumps Suggested Actions Consider impeller trimming when any of the following apply: * The head provided by an oversized, throttled pump exceeds process requirements. * System bypass valves are open, indicating excess flow rate. * The pump is operating far from its design point. * The operating head and (or) flow rate are greater than process requirements. Resources Improving Pumping System Performance: A Sourcebook for Industry, DOE and

  15. CX-004817: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Replace Air Handling Unit Heating, Ventilation, and Air Conditioning (HVAC)-AHU-20984 (HVAC-FAN-E21) with HVAC-AHU-E-1, Building 773-A, Section E Southeast RoofCX(s) Applied: B1.3Date: 12/07/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office

  16. EA-1793: Replacement Capability for Disposal of Remote-handled Low-level Waste Generated at the Department of Energy's Idaho Site

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of replacement capability for disposal of remote-handled low-level radioactive waste (LLW) generated at the Idaho National Laboratory (INL) site beginning in October 2017.

  17. CALiPER Benchmark Report: Performance of T12 and T8 Fluorescent Lamps and Troffers and LED Linear Replacement Lamps

    SciTech Connect (OSTI)

    Myer, M. A.; Paget, M. L.; Lingard, R. D.

    2009-01-01

    This report examines standard fluorescent lamps, the recessed troffers they are commonly used in, and available LED replacements for T12 and T8 fluorescent lamps and their application in fluorescent troffers.

  18. Replacement energy costs for nuclear electricity-generating units in the United States: 1997--2001. Volume 4

    SciTech Connect (OSTI)

    VanKuiken, J.C.; Guziel, K.A.; Tompkins, M.M.; Buehring, W.A.

    1997-09-01

    This report updates previous estimates of replacement energy costs for potential short-term shutdowns of 109 US nuclear electricity-generating units. This information was developed to assist the US Nuclear Regulatory Commission (NRC) in its regulatory impact analyses, specifically those that examine the impacts of proposed regulations requiring retrofitting of or safety modifications to nuclear reactors. Such actions might necessitate shutdowns of nuclear power plants while these changes are being implemented. The change in energy cost represents one factor that the NRC must consider when deciding to require a particular modification. Cost estimates were derived from probabilistic production cost simulations of pooled utility system operations. Factors affecting replacement energy costs, such as random unit failures, maintenance and refueling requirements, and load variations, are treated in the analysis. This report describes an abbreviated analytical approach as it was adopted to update the cost estimates published in NUREG/CR-4012, Vol. 3. The updates were made to extend the time frame of cost estimates and to account for recent changes in utility system conditions, such as change in fuel prices, construction and retirement schedules, and system demand projects.

  19. New York Power Authority/New York City Housing Authority refrigerator replacement program, first program year evaluation. Final report

    SciTech Connect (OSTI)

    Kinney, L.F.; Lewis, G.; Pratt, R.G.; Miller, J.

    1997-08-01

    Acting as an energy services provider, the New York Power Authority (NYPA) has initiated a long-term project through which 20,000 refrigerators per year will be replaced with the most energy-efficient units possible in apartments managed by the New York City Housing Authority (NYCHA). Using bulk purchasing as an incentive to appliance manufacturers to produce energy-efficient refrigerators suitable for use in apartments, replaced in the first year of the program, which ended in December 1996. These units, kWh per year. Savings were determined by field testing and laboratory testing of 220 existing refrigerators and 56 newly-installed units. In the next program year, a 15.0-cubic-foot Maytag refrigerator, newly-designed in response to bulk purchasing incentives, is being installed. The new unit has a label rating of 437 kWh per year, 31 percent better than 1993 energy standards. Old refrigerators removed from apartments are {open_quotes}demanufactured{close_quotes} in an environmentally-appropriate way and both metals and refrigerants are recovered for reuse.

  20. Conceptual Design for Replacement of the DTL and CCL with Superconducting RF Cavities in the Spallation Neutron Source Linac

    SciTech Connect (OSTI)

    Champion, Mark S; Doleans, Marc; Kim, Sang-Ho

    2013-01-01

    The Spallation Neutron Source Linac utilizes normal conducting RF cavities in the low energy section from 2.5 MeV to 186 MeV. Six Drift Tube Linac (DTL) structures accelerate the beam to 87 MeV, and four Coupled Cavity Linac (CCL) structures provide further acceleration to 186 MeV. The remainder of the Linac is comprised of 81 superconducting cavities packaged in 23 cryomodules to provide final beam energy of approximately 1 GeV. The superconducting Linac has proven to be substantially more reliable than the normal conducting Linac despite the greater number of stations and the complexity associated with the cryogenic plant and distribution. A conceptual design has been initiated on a replacement of the DTL and CCL with superconducting RF cavities. The motivation, constraints, and conceptual design are presented.

  1. Experimental Performance of R-1234yf and R-1234ze as Drop-in Replacements for R-134a in Domestic Refrigerators

    SciTech Connect (OSTI)

    Karber, Kyle M; Abdelaziz, Omar; Vineyard, Edward Allan

    2012-01-01

    Concerns about anthropogenic climate change have generated an interest in low global warming potential (GWP) refrigerants and have spawned policies and regulations that encourage the transition to low GWP refrigerants. Recent research has largely focused on hydrofluoroolefins (HFOs), including R-1234yf (GWP = 4) as a replacement for R-134a (GWP = 1430) in automotive air-conditioning applications. While R-1234yf and R-1234ze (GWP = 6) have been investigated theoretically as a replacements for R-134a in domestic refrigeration, there is a lack of experimental evidence. This paper gives experimental performance data for R-1234yf and R-1234ze as drop-in replacements for R134a in two household refrigerators one baseline and one advanced technology. An experiment was conducted to evaluate and compare the performance of R-134a to R-1234yf and R-1234ze, using AHAM standard HRF-1 to evaluate energy consumption. These refrigerants were tested as drop-in replacements, with no performance enhancing modifications to the refrigerators. In Refrigerator 1 and 2, R-1234yf had 2.7% and 1.3% higher energy consumption than R-134a, respectively. This indicates that R-1234yf is a suitable drop-in replacement for R-134a in domestic refrigeration applications. In Refrigerator 1 and 2, R-1234ze had 16% and 5.4% lower energy consumption than R-134a, respectively. In order to replace R-134a with R-1234ze in domestic refrigerators the lower capacity would need to be addressed, thus R-1234ze might not be suitable for drop-in replacement.

  2. Normetex Pump Replacement

    Broader source: Energy.gov [DOE]

    Presentation from the 32nd Tritium Focus Group Meeting held in Germantown, Maryland on April 23-25, 2013.

  3. Git Replacement for the

    Energy Science and Technology Software Center (OSTI)

    2014-09-23

    GRAPE is a tool for managing software project workflows for the Git version control system. It provides a suite of tools to simplify and configure branch based development, integration with a project's testing suite, and integration with the Atlassian Stash repository hosting tool.

  4. Replacing Lightbulbs and Ballasts

    Broader source: Energy.gov [DOE]

    Buy new fixtures made for new lightbulbs for the greatest energy savings, reliability, and longevity.

  5. Environmental assessment of the brine pipeline replacement for the Strategic Petroleum Reserve Bryan Mound Facility in Brazoria County, Texas

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0804, for the proposed replacement of a deteriorated brine disposal pipeline from the Strategic Petroleum Reserve (SPR) Bryan Mound storage facility in Brazoria County, Texas, into the Gulf of Mexico. In addition, the ocean discharge outfall would be moved shoreward by locating the brine diffuser at the end of the pipeline 3.5 miles offshore at a minimum depth of 30 feet. The action would occur in a floodplain and wetlands; therefore, a floodplain/wetlands assessment has been prepared in conjunction with this EA. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 USC. 4321, et seg.). Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and the Department is issuing this Finding of No Significant Impact (FONSI). This FONSI also includes a Floodplain Statement of Findings in accordance with 10 CFR Part 1022.

  6. High Level Waste Tank Farm Replacement Project for the Idaho Chemical Processing Plant at the Idaho National Engineering Laboratory. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0831, for the construction and operation of the High-Level Waste Tank Farm Replacement (HLWTFR) Project for the Idaho Chemical Processing Plant located at the Idaho National Engineering Laboratory (INEL). The HLWTFR Project as originally proposed by the DOE and as analyzed in this EA included: (1) replacement of five high-level liquid waste storage tanks with four new tanks and (2) the upgrading of existing tank relief piping and high-level liquid waste transfer systems. As a result of the April 1992 decision to discontinue the reprocessing of spent nuclear fuel at INEL, DOE believes that it is unlikely that the tank replacement aspect of the project will be needed in the near term. Therefore, DOE is not proposing to proceed with the replacement of the tanks as described in this-EA. The DOE`s instant decision involves only the proposed upgrades aspect of the project described in this EA. The upgrades are needed to comply with Resource Conservation and Recovery Act, the Idaho Hazardous Waste Management Act requirements, and the Department`s obligations pursuant to the Federal Facilities Compliance Agreement and Consent Order among the Environmental Protection Agency, DOE, and the State of Idaho. The environmental impacts of the proposed upgrades are adequately covered and are bounded by the analysis in this EA. If DOE later proposes to proceed with the tank replacement aspect of the project as described in the EA or as modified, it will undertake appropriate further review pursuant to the National Environmental Policy Act.

  7. Replace Pressure-Reducing Valves with Backpressure Turbogenerators, Energy Tips: STEAM, Steam Tip Sheet #20 (Fact Sheet), Advanced Manufacturing Office (AMO), Energy Efficiency & Renewable Energy (EERE)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Replace Pressure-Reducing Valves with Backpressure Turbogenerators Many industrial facilities produce steam at a pressure higher than that demanded by process requirements. Steam passes through pressure-reducing valves (PRVs, also known as letdown valves) at various locations in the steam distribution system to let down or reduce its pressure. A noncondensing or backpressure steam turbine can perform the same pressure-reducing function as a PRV while converting steam energy into electrical

  8. Replacement, Variable-Speed Motors for Furnaces, Syracuse, New York (Fact Sheet), Building America Case Study: Technology Solutions for New and Existing Homes, Building Technologies Office (BTO)

    Energy Savers [EERE]

    Replacement of Variable-Speed Motors for Furnaces Syracuse, New York PROJECT INFORMATION Project Name: Evaluation of Concept 3 BPM motors Location: Syracuse, NY Partners: New York State Energy Research and Development Authority (NYSERDA) www.nyserda.org Proctor Engineering Group (PEG) www.proctoreng.com Tag Mechanical www.taghomeperformance.com/ Consortium for Advanced Residential Buildings www.carb-swa.com Building Component: HVAC Application: Retrofit, homes with forced air distribution Year

  9. Proposed methodology for combustion toxicology testing of combined halon replacement agent/jet fuel interaction. Final report, June-September 1991

    SciTech Connect (OSTI)

    Kibert, C.J.

    1993-04-01

    An international consensus to remove Chlorofluorocarbon (CFC) compounds from production and U.S. national policy to implement the resulting protocols has motivated the U.S. Air Force to embark on a program to find a suitable replacement for Halon 1211, currently used to extinguish flight line fires. This research addressed the feasibility of conducting a combustion toxicology (CT) program to assess the toxic products of the combustion interaction of JP-8 and the Group 1 or so-called Near Term candidate replacement agents for Halon 1211: HCFCs -123, -124, and -142b. A laboratory scale experiment benchmarked on large scale testing of a 150 sq ft pool fire was developed on the basis of Froude scaling of the full scale fire to a 15 x 15 cm pan fire. A prototype apparatus was developed and investigation into the use of animal behavior methods as an indicator of human incapacitation was conducted. The result is a new method which may potentially be utilized for future toxicity studies of the combustion interaction of current and future U.S. Air Force fuels with various fire extinguishants. Extinguishing agents, Halon 1211, Halon replacement, Combustion.

  10. Performance of T12 and T8 Fluorescent Lamps and Troffers and LED Linear Replacement Lamps CALiPER Benchmark Report

    SciTech Connect (OSTI)

    Myer, Michael; Paget, Maria L.; Lingard, Robert D.

    2009-01-16

    The Department of Energy (DOE) Commercially Available LED Product Evaluation and Reporting (CALiPER) Program was established in 2006 to investigate the performance of light-emitting diode (LED) based luminaires and replacement lamps. To help users better compare LED products with conventional lighting technologies, CALiPER has also performed benchmark research and testing of traditional (i.e., non-LED) lamps and fixtures. This benchmark report addresses standard 4-foot fluorescent lamps (i.e., T12 and T8) and the 2-foot by 4-foot recessed troffers in which they are commonly used. This report also examines available LED replacements for T12 and T8 fluorescent lamps, and their application in fluorescent troffers. The construction and operation of linear fluorescent lamps and troffers are discussed, as well as fluorescent lamp and fixture performance, based on manufacturer data and CALiPER benchmark testing. In addition, the report describes LED replacements for linear fluorescent lamps, and compares their bare lamp and in situ performance with fluorescent benchmarks on a range of standard lighting measures, including power usage, light output and distribution, efficacy, correlated color temperature, and the color rendering index. Potential performance and application issues indicated by CALiPER testing results are also examined.

  11. Alternatives to Diesel Fuel in California - Fuel Cycle Energy and Emission Effects of Possible Replacements Due to the TAC Diesel Particulate Decision

    SciTech Connect (OSTI)

    Christopher L. Saraicks; Donald M. Rote; Frank Stodolsky; James J. Eberhardt

    2000-05-01

    Limitations on petroleum-based diesel fuel in California could occur pursuant to the 1998 declaration by California's Air Resources Board (CARB) that the particulate matter component of diesel exhaust is a carcinogen, therefore a toxic air contaminant (TAC) subject to the state's Proposition 65. It is the declared intention of CARB not to ban or restrict diesel fuel, per se, at this time. Assuming no total ban, Argonne National Laboratory (ANL) explored two feasible ''mid-course'' strategies, each of which results in some degree of (conventional) diesel displacement. In the first case, with substantial displacement of compression ignition by spark ignition engines, diesel fuel is assumed admissible for ignition assistance as a pilot fuel in natural gas (NG)-powered heavy-duty vehicles. Gasoline demand in California increases by 32.2 million liters (8.5 million gallons) per day overall, about 21 percent above projected 2010 baseline demand. Natural gas demand increases by 13.6 million diesel liter (3.6 million gallon) equivalents per day, about 7 percent above projected (total) consumption level. In the second case, ressionignition engines utilize substitutes for petroleum-based diesel having similar ignition and performance properties. For each case we estimated localized air emission plus generalized greenhouse gas and energy changes. Fuel replacement by di-methyl ether yields the greatest overall reduction in NOx emissions, though all scenarios bring about PM10 reductions relative to the 2010 baseline, with greatest reductions from the first case described above and the least from fuel replacement by Fischer-Tropsch synthetic diesel. Economic implications of vehicle and engine replacement were not formally evaluated.

  12. Alternatives to diesel fuel in California - fuel cycle energy and emission effects of possible replacements due to the TAC diesel particulate decision.

    SciTech Connect (OSTI)

    Saricks, C. L.; Rote, D. M.; Stodolsky, F.; Eberhardt, J. J.

    1999-12-03

    Limitations on petroleum-based diesel fuel in California could occur pursuant to the 1998 declaration by California's Air Resources Board (CARB) that the particulate matter component of diesel exhaust is a carcinogen, therefore a toxic air contaminant (TAC) subject to the state's Proposition 65. It is the declared intention of CARB not to ban or restrict diesel fuel per se, at this time. Assuming no total ban, Argonne National Laboratory (ANL) explored two feasible mid-course strategies, each of which results in some degree of (conventional) diesel displacement. In the first case, with substantial displacement of compression-ignition by spark-ignition engines, diesel fuel is assumed admissible for ignition assistance as a pilot fuel in natural gas (NG)-powered heavy-duty vehicles. Gasoline demand in California increases by 32.2 million liters (8.5 million gallons) per day overall, about 21% above projected 2010 baseline demand. Natural gas demand increases by 13.6 million diesel liter (3.6 million gallon) equivalents per day, about 7% above projected (total) consumption level. In the second case, compression-ignition engines utilize substitutes for petroleum-based diesel having similar ignition and performance properties. For each case the authors estimated localized air emission plus generalized greenhouse gas and energy changes. Fuel replacement by di-methyl ether yields the greatest overall reduction in NOX emissions, though all scenarios bring about PM{sub 10} reductions relative to the 2010 baseline, with greatest reductions from the first case described above and the least from fuel replacement by Fischer-Tropsch synthetic diesel. Economic implications of vehicle and engine replacement were not formally evaluated.

  13. Construction-employment opportunities of four oil-replacing space-heating alternatives for core areas of thirteen major northeastern and midwestern cities

    SciTech Connect (OSTI)

    Santini, D.J.; Wernette, D.R.

    1980-07-01

    Construction employment opportunities are compared for four oil-replacing technologies providing equivalent space-heating services to the core areas of 13 major northeastern and midwestern cities. The four technologies are: cogeneration district heating, coal gasification, coal liquefaction and electrification (coal-fired power plant). It is observed that the district-heating option places a higher percentage of its capital stock within the center city. It also requires lower occupational skills for its construction than the other three alternatives. In view of the lower average educational level of minorities and their concentration in urban areas, substantially more minority employment should occur if district heating is implemented. This alternative also will provide employment opportunities for unemployed nonminority construction laborers and contribute indirectly to the improvement of inner-city neighborhoods where many unemployed construction laborers live.

  14. Virent is Replacing Crude Oil

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Crude Oil Reformate BTX PX PTA PET resin Preform Bottle Naphtha Biomass Reformate BTX PX Virent PET fiber Textile Clothing BioFormPX Brand Supply chain innovation Opportunity ...

  15. SU-F-BRE-13: Replacing Pre-Treatment Phantom QA with 3D In-Vivo Portal Dosimetry for IMRT Breast Cancer

    SciTech Connect (OSTI)

    Stroom, J; Vieira, S; Greco, C; Olaciregui-Ruiz, I; Rozendaal, R; Herk, M van; Moser, E

    2014-06-15

    Purpose: Pre-treatment QA of individual treatment plans requires costly linac time and physics effort. Starting with IMRT breast treatments, we aim to replace pre-treatment QA with in-vivo portal dosimetry. Methods: Our IMRT breast cancer plans are routinely measured using the ArcCheck device (SunNuclear). 2D-Gamma analysis is performed with 3%/3mm criteria and the percentage of points with gamma<1 (nG1) is calculated within the 50% isodose surface. Following AAPM recommendations, plans with nG1<90% are approved; others need further inspection and might be rejected. For this study, we used invivo portal dosimetry (IPD) to measure the 3D back-projected dose of the first three fractions for IMRT breast plans. Patient setup was online corrected before for all measured fractions. To reduce patient related uncertainties, the three IPD results were averaged and 3D-gamma analysis was applied with abovementioned criteria . For a subset of patients, phantom portal dosimetry (PPD) was also performed on a slab phantom. Results: Forty consecutive breast patients with plans that fitted the EPID were analysed. The average difference between planned and IPD dose in the reference point was ?0.7+/?1.6% (1SD). Variation in nG1 between the 3 invivo fractions was about 6% (1SD). The average nG1 for IPD was 89+/?6%, worse than ArcCheck (95+/?3%). This can be explained by patient related factors such as changes in anatomy and/or model deficiencies due to e.g. inhomogeneities. For the 20 cases with PPD, mean nG1 was equal to ArcCheck values, which indicates that the two systems are equally accurate. These data therefore suggest that proper criteria for 3D invivo verification of breast treatments should be nG1>80% instead of nG1>90%, which, for our breast cases, would result in 5% (2/40) further inspections. Conclusion: First-fraction in-vivo portal dosimetry using new gamma-evaluation criteria will replace phantom measurements in our institution, saving resources and yielding 3D dosimetry of the actual patient treatment.

  16. Anterior Myocardial Territory May Replace the Heart as Organ at Risk in Intensity-Modulated Radiotherapy for Left-Sided Breast Cancer

    SciTech Connect (OSTI)

    Tan Wenyong; Liu Dong; Xue Chenbin; Xu Jiaozhen; Li Beihui; Chen Zhengwang; Hu Desheng; Wang Xionghong

    2012-04-01

    Purpose: We investigated whether the heart could be replaced by the anterior myocardial territory (AMT) as the organ at risk (OAR) in intensity-modulated radiotherapy (IMRT) of the breast for patients with left-sided breast cancer. Methods and Materials: Twenty-three patients with left-sided breast cancer who received postoperative radiation after breast-conserving surgery were studied. For each patient, we generated five IMRT plans including heart (H), left ventricle (LV), AMT, LV+AMT, and H+LV as the primary OARs, respectively, except both lungs and right breast, which corresponded to IMRT(H), IMRT(LV), IMRT(AMT), IMRT(LV+AMT), and IMRT(H+LV). For the planning target volumes and OARs, the parameters of dose-volume histograms were compared. Results: The homogeneity index, conformity index, and coverage index were not compromised significantly in IMRT(AMT), IMRT(LV) and IMRT(LV+ AMT), respectively, when compared with IMRT(H). The mean dose to the heart, LV, and AMT decreased 5.3-21.5% (p < 0.05), 19.9-29.5% (p < 0.05), and 13.3-24.5% (p < 0.05), respectively. Similarly, the low (e.g., V5%), middle (e.g., V20%), and high (e.g., V30%) dose-volume of the heart, LV, and AMT decreased with different levels. The mean dose and V10% of the right lung increased by 9.2% (p < 0.05) and 27.6% (p < 0.05), respectively, in IMRT(LV), and the mean dose and V5% of the right breast decreased significantly in IMRT(AMT) and IMRT(LV+AMT). IMRT(AMT) was the preferred plan and was then compared with IMRT(H+LV); the majority of dose-volume histogram parameters of OARs including the heart, LV, AMT, both lungs, and the right breast were not statistically different. However, the low dose-volume of LV increased and the middle dose-volume decreased significantly (p < 0.05) in IMRT(AMT). Also, those of the right lung (V10%, V15%) and right breast (V5%, V10%) decreased significantly (p < 0.05). Conclusions: The AMT may replace the heart as the OAR in left-sided breast IMRT after breast-conserving surgery to decrease the radiation dose to the heart.

  17. Public Invited to Comment on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at the U.S. Department of Energy’s Idaho Site

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy invites the public to read and comment on a draft environmental assessment it has prepared, for a proposal to provide a replacement capability for continued disposal of remote-handled low-level radioactive waste that is generated at the Idaho National Laboratory site.

  18. DOE Media Advisory- DOE extends public comment period on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the U.S. Department of Energy’s Idaho Site

    Broader source: Energy.gov [DOE]

    In response to requests from people interested in National Environmental Policy Act activities occurring at the U.S. Department of Energy’s Idaho Operations Office, the department has extended the public comment period that began September 1 on the Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the U.S. Department of Energy’s Idaho Site.

  19. EIS-0350-S1: Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico

    Broader source: Energy.gov [DOE]

    This Supplemental EIS evaluates the completion of the Chemistry and Metallurgy Research Building Replacement (CMRR) Project, which consists of constructing the nuclear facility portion (CMRR-NF) at Los Alamos National Laboratory (LANL). The CMRR Project provides the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building. Because of recent detailed site geotechnical investigations, certain aspects of the CMRR-NR project have changed resulting in change to the environmental impacts.

  20. H. R. 3052: This Act may be cited as the Coal Field Water Protection and Replacement Act, introduced in the US House of Representatives, One Hundred Second Congress, First Session, July 25, 1991

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    This bill would amend the Surface Mining Control and Reclamation Act of 1977 to provide for the protection of water resources during coal mining operations. Sections of the bill describe probable hydrologic consequences; surface and ground water monitoring plan; performance bonds; protection of water resources for permit approval; effect of underground coal mining operations; inspection and monitoring; penalty for failure of representative of Secretary or state regulatory authority to carry out certain duties; release of performance bond; water rights and replacement; regulations; and state programs.

  1. The effect of replacement of Sr by Ca on the structural and luminescence properties of the red-emitting Sr{sub 2}Si{sub 5}N{sub 8}:Eu{sup 2+} LED conversion phosphor

    SciTech Connect (OSTI)

    Li, Y.Q.; With, G. de; Hintzen, H.T.

    2008-03-15

    The influence of the replacement of Sr by Ca on structural and luminescence properties of Eu{sup 2+}-doped Sr{sub 2}Si{sub 5}N{sub 8} is reported. The Rietveld refinement of the powder X-ray diffraction data shows that the Ca{sup 2+} ion preferentially occupies the larger Sr site in Sr{sub 2}Si{sub 5}N{sub 8}:Eu{sup 2+}. Although the excitation spectrum is hardly modified, the position of the emission band of Eu{sup 2+} can be tailored through partial replacement of Sr by Ca in Sr{sub 2}Si{sub 5}N{sub 8}:Eu{sup 2+}, resulting in red-emission shifting from 620 to 643 nm. Furthermore, (Sr, Ca){sub 2}Si{sub 5}N{sub 8}:Eu{sup 2+} shows high potential as a conversion phosphor for white-light LED applications due to similar absorption, conversion efficiency and thermal quenching behaviour for 465 nm excitation after the introduction of the Ca ion. - Graphical abstract: The temperature dependence of the luminescence efficiency of M{sub 1.9}Eu{sub 0.1}Si{sub 5}N{sub 8} (M=Ca, Sr, Ba) and Sr{sub 1.3}Ca{sub 0.6}Eu{sub 0.1}Si{sub 5}N{sub 8} ({lambda}{sub exc}=465 nm)

  2. Collector main replacement at Indianapolis Coke

    SciTech Connect (OSTI)

    Sickle, R.R. Van

    1997-12-31

    Indianapolis Coke is a merchant coke producer, supplying both foundry and blast furnace coke to the industry. The facility has three coke batteries: two 3 meter batteries, one Wilputte four divided and one Koppers Becker. Both batteries are underjet batteries and are producing 100% foundry coke at a net coking time of 30.6 hours. This paper deals with the No. 1 coke battery, which is a 72 oven, gun fired, 5 meter Still battery. No. 1 battery produces both foundry and blast furnace coke at a net coking rate of 25.4 hours. No. 1 battery was commissioned in 1979. The battery is equipped with a double collector main. Although many renovations have been completed to the battery, oven machinery and heating system, to date no major construction projects have taken place. Deterioration of the collector main was caused in part from elevated levels of chlorides in the flushing liquor, and temperature fluctuations within the collector main. The repair procedures are discussed.

  3. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and six draft tube bulkheads to completely dewater the unit. With the current complement of bulkheads and gates, three units can be dewatered at John Day. The additional...

  4. Solid State Replacement of Rotating Mirror Cameras

    SciTech Connect (OSTI)

    Frank, A M; Bartolick, J M

    2006-08-25

    Rotating mirror cameras have been the mainstay of mega-frame per second imaging for decades. There is still no electronic camera that can match a film based rotary mirror camera for the combination of frame count, speed, resolution and dynamic range. The rotary mirror cameras are predominantly used in the range of 0.1 to 100 micro-seconds per frame, for 25 to more than a hundred frames. Electron tube gated cameras dominate the sub microsecond regime but are frame count limited. Video cameras are pushing into the microsecond regime but are resolution limited by the high data rates. An all solid state architecture, dubbed ''In-situ Storage Image Sensor'' or ''ISIS'', by Prof. Goji Etoh, has made its first appearance into the market and its evaluation is discussed. Recent work at Lawrence Livermore National Laboratory has concentrated both on evaluation of the presently available technologies and exploring the capabilities of the ISIS architecture. It is clear though there is presently no single chip camera that can simultaneously match the rotary mirror cameras, the ISIS architecture has the potential to approach their performance.

  5. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ferranti generator step-up (GSU) transformers and Central Transformer Corporation fish unit transformers with new air cooled GSU transformers. The specific banks proposed for...

  6. Promising Technology: R-5 Window Replacements

    Broader source: Energy.gov [DOE]

    A significant amount of the energy used to heat and cool commercial buildings is lost through inefficient windows. Incorporating windows into a building that are resistant to heat transfer can significantly reduce the amount of energy that is lost through windows. R-values are an indication of how resistant a window is to heat transfer, and a larger R-value indicates a more insulating window. An R-5 window represents an efficient window, and has a larger R-value than what is required to qualify for ENERGY STAR.

  7. Replacing an Oversized and Underloaded Electric Motor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sixth World Energy Engineering Congress, Atlanta, Georgia, December 1, 1983. 2 Jeffrey ... American Council for an Energy Efficient Economy Summer Study on Energy Efficiency in ...

  8. Remotely replaceable tokamak plasma limiter tiles

    DOE Patents [OSTI]

    Gallix, R.

    1987-12-09

    U-shaped tiles placed end-to-end over a pair of parallel runners have two rods which engage L-shaped slots. A sliding bar between the runners has grooves with clips to retain the rods pressed into receiving legs of the L-shaped slots in the runners. Sliding the bar in the direction of retaining legs of the L-shaped slots latches the tiles in place over the wall. Resilient contact strips under the parallel sides of the U-shaped tile assure thermal and electrical contact with the wall. 6 figs.

  9. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Granite Unit 1 Linkage Upgrade This investment will refurbish the U1 turbine runner linkage at Lower Granite and return it to full Kaplan (adjustable) capability. On January 10,...

  10. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    over half of the plant's generation capacity. While Unit 3 provides significant financial value, it is also critical to successful environmental operations. An outage during the...

  11. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lower Valley load area is located in eastern Idaho and western Wyoming and includes Jackson, Wyoming as well as a number of smaller communities. Customers served are Lower...

  12. scanned replacement pages Mod 151.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  13. Sustainable LED Fluorescent Light Replacement Technology

    SciTech Connect (OSTI)

    2011-06-30

    Ilumisys and the National Center for Manufacturing Sciences (NCMS) partnered on a three-year project awarded by the United States (U.S.) Department of Energy (DOE), to quantify the impacts of LED lamps, incandescent lamps and fluorescent benchmark lamps over a product lifecycle – i.e. to develop a sustainable design and manufacturing strategy that addresses product manufacturing, use, recycling and disposal scenarios for LED-based lighting. Based on the knowledge gained from extensive product tear-down studies of fluorescent and screw-in lighting products, lifecycle assessment tools, and accelerated lifecycle testing protocols, an interactive Sustainable LED Design Guide has been developed to aid architectural and lighting designers and engineers in making design decisions that consider three important environmental impacts (greenhouse gas emissions, energy use and mercury emission) across all phases of the life of an LED lighting product. Critical information developed for the lifecycle analysis and product feature comparisons is the useful life of the lighting product as well as its performance. The Design Guide is available at www.ncms.org, and was developed based on operational and durability testing of a variety of lighting products including power consumption, light output, and useful life of a lamp in order to allow a more realistic comparison of lamp designs. This report describes the main project tasks, results and innovative features of the lifecycle assessment (LCA)-based design tools, and the key considerations driving the sustainable design of LED lighting systems. The Design Guide incorporates the following three novel features for efficiently evaluating LED lighting features in value-chains: • Bill-of-Materials (BOM) Builder – Designers may import process data for each component and supply functional data for the product, including power, consumption, lumen output and expected useful life. • Environmental Impact Review – Designs are comparable across lifecycle phases, subsystems, and environmental impact category, and can be normalized to a userdefined functional unit. • Drill-down Review – These provide an indepth look at individual lamp designs with the ability to review across subsystem or lifecycle phase.

  14. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    systems are vitally important to BPA operations as they are used to collect real- time reservoir operations and water release data, provide operational tools for management of...

  15. Remotely replaceable tokamak plasma limiter tiles

    DOE Patents [OSTI]

    Tsuo, Simon (Lakewood, CO), Langford, Alison A. (Boulder, CO)

    1989-01-01

    U-shaped limiter tiles placed end-to-end over a pair of parallel runners secured to a wall have two rods which engage L-shaped slots in the runners. The short receiving legs of the L-shaped slots are perpendicular to the wall and open away from the wall, while long retaining legs are parallel to and adjacent the wall. A sliding bar between the runners has grooves with clips to retain the rods pressed into receiving legs of the L-shaped slots in the runners. Sliding the bar in the direction of retaining legs of the L-shaped slots latches the tiles in place over the runners. Resilient contact strips between the parallel arms of the U-shaped tiles and the wall assure thermal and electrical contact with the wall.

  16. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    as an arc extinguishing medium and each contains approximately 210 gallons of insulating oil. There are three or more breakers for each pair of generators and they pose a...

  17. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Spare Transformers for Hub Wind Sites This project includes the installation of a spare, single phase transformer at four existing "hub" facilities. These "hub" facilities, as...

  18. Grand Coulee & Hungry Horse SCADA Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    rebuild based on performance (outage reports), type of conductor and condition of the poles. The condition is evidenced by the fact that over 60 of the line's 366 poles have been...

  19. H. R. 3710: A Bill to amend the Internal Revenue Code of 1986 to allow individuals a credit for expenditures to remove and replace underground home heating oil storage tanks in certain areas. Introduced in the House of Representatives, One Hundredth First Congress, First Session, November 17, 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01

    The bill would allow a tax credit in the amount equal to 25 percent of the removal and replacement expenditures made by the taxpayer during the taxable year, not to exceed 2000 dollars. The tank must be located at the principal residence of the taxpayer, be used to store heating oil for the residence, and be located in a critical aquifer protection area, as defined in the Public Health Service Act.

  20. Load beam unit replaceable inserts for dry coal extrusion pumps

    DOE Patents [OSTI]

    Saunders, Timothy; Brady, John D.

    2012-11-13

    A track assembly for a particulate material extrusion pump according to an exemplary aspect of the present disclosure includes a link assembly with a roller bearing. An insert mounted to a load beam located such that the roller bearing contacts the insert.

  1. Drafty Windows: Is it Better to Insulate or Replace Them?

    Broader source: Energy.gov [DOE]

    I’ve lived in my condominium for several years, and though it naturally stays cooler in the summer (with all west-facing windows) I struggle to keep it warm in the winter without taking out a loan to pay utilities

  2. Boron-10 Neutron Detectors for Helium-3 Replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    efficiencies comparable to Helium-3 detectors, with demonstrated gamma neutron discrimination. Available for thumbnail of Feynman Center (505) 665-9090 Email Boron-10 Neutron...

  3. cx-structure-replacement-3005-290-okla.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  4. Sprinkler Head Replacement (4586), 4/24/2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    engineered organisms, synthetic biology, governmentally designated noxious weeds, or invasive species, unless the proposed activity would be contained or confined in a manner...

  5. Duct Chase Sprinkler Replacement Project (4594), 5/31/2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    engineered organisms, synthetic biology, governmentally designated noxious weeds, or invasive species, unless the proposed activity would be contained or confined in a manner...

  6. Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A significant feature of the program is the reduction and partial elimination of trips required (usually by diesel-powered trucks) to refuel andor repair remotely located pumping ...

  7. Water Monitoring Flume Replaced at the Rocky Flats, Colorado, Site

    Broader source: Energy.gov [DOE]

    In August of this year the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Rocky Flats, site took advantage of an existing water diversion structure that was no longer needed, to...

  8. Replacement of tritiated water from irradiated fuel storage bay

    SciTech Connect (OSTI)

    Castillo, I.; Boniface, H.; Suppiah, S.; Kennedy, B.; Minichilli, A.; Mitchell, T.

    2015-03-15

    Recently, AECL developed a novel method to reduce tritium emissions (to groundwater) and personnel doses at the NRU (National Research Universal) reactor irradiated fuel storage bay (also known as rod or spent fuel bay) through a water swap process. The light water in the fuel bay had built up tritium that had been transferred from the heavy water moderator through normal fuel transfers. The major advantage of the thermal stratification method was that a very effective tritium reduction could be achieved by swapping a minimal volume of bay water and warm tritiated water would be skimmed off the bay surface. A demonstration of the method was done that involved Computational Fluid Dynamics (CFD) modeling of the swap process and a test program that showed excellent agreement with model prediction for the effective removal of almost all the tritium with a minimal water volume. Building on the successful demonstration, AECL fabricated, installed, commissioned and operated a full-scale system to perform a water swap. This full-scale water swap operation achieved a tritium removal efficiency of about 96%.

  9. Applications of molecular replacement to G protein-coupled receptors...

    Office of Scientific and Technical Information (OSTI)

    Despite their profound importance in human health and disease, structural information ... OSTI Identifier: 22347800 Resource Type: Journal Article Resource Relation: Journal Name: ...

  10. New Feedstocks and Replacement Fuels - Future Energy for Mobility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Future Energy for Mobility Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan. Sponsored by the U.S. DOE's EERE FreedomCar and Fuel Partnership and 21st...

  11. Why New Neutron Detector Materials Must Replace Helium-3

    SciTech Connect (OSTI)

    Hurd, Alan J.; Kouzes, Richard T.

    2014-10-01

    This is an article for the European Physics Journal on the status of the He-3 problem. Alan Hurd from LANL is the main author.

  12. Heavy-Duty Natural Gas Drayage Truck Replacement Program

    Broader source: Energy.gov [DOE]

    2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  13. Magnesium Replacement of Aluminum Cast Components in a Production...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Research (DEER) Conference in Detroit, MI, September 27-30, 2010. PDF icon deer10powell.pdf More Documents & Publications Magnesium Powertrain Cast Components FY 2009...

  14. New Feedstocks and Replacement Fuel Diesel Engine Challenges

    Broader source: Energy.gov [DOE]

    Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan. Sponsored by the U.S. DOE's EERE FreedomCar and Fuel Partnership and 21st Century Truck Programs.

  15. Microsoft Word - xx xx 13 Midway pole replacement news release...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    local utilities. The public meeting is: Wednesday, Feb. 20, 2013 4 p.m. to 7 p.m. Moxee City Hall 255 W. Seattle Ave. Moxee, WA 98936 Because there will not be a formal...

  16. Quenching and Partitioning Process Development to Replace Hot...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    temperature forming operations using lean alloy compositions Alloying, processing, microstructural evolution and mechanical properties inter-relationships are being studied. ...

  17. Cobalt discovery replaces precious metals as industrial catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    process biomass to fuel June, 19 2013 - Improved methods for breaking down cellulose nanofibers are central to cost-effective biofuel production. A high-resolution microscopic...

  18. Y-12 replaces Fort Knox? as standard for security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for security On Monday, September 29, 2008, an historic milestone was reached at the Y-12 National Security Complex. The Highly Enriched Uranium Materials Facility (HEUMF) was...

  19. Glove port retrofit assembly and method of replacing components

    DOE Patents [OSTI]

    Giesen, Isaac M; Cournoyer, Michael E; Rael, David G

    2014-11-18

    What is disclosed is a system for retrofitting a sealed enclosure for performing work therein having an outer enclosure assembly configured to be clamped to the outer annular face of a port ring and form a sealed engagement with the outer annular surface of the port ring, a change assembly having an inner ring and an access element wherein the inner ring has a first annular cylinder body that is sized to be slidably received by the port ring and the access element is configured to be sealably and slidably positioned within the first annular cylinder body of the inner ring.

  20. Solid Oxide Fuel Cells (SOFC) as Military APU Replacements

    Broader source: Energy.gov [DOE]

    Presentation by Thomas Reitz, Air Force Research Laboratory, at the DOD-DOE Aircraft Petroleum Use Reduction Workshop, September 30, 2010, in Washington, DC.

  1. New Feedstocks and Replacement Fuel Diesel Engine Challenges...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications BiodieselFuelManagementBestPracticesReport.pdf Vehicle Technologies Office: 2008-2009 Fuels Technologies R&D Progress Report Biodiesel Basics ...

  2. Operational test procedure for SY tank farm replacement exhauster unit

    SciTech Connect (OSTI)

    McClees, J.

    1995-09-26

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly.

  3. Cobalt discovery replaces precious metals as industrial catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    biofuels, and the reduction of carbon dioxide. It also has implications for organic chemistry, where hydrogenation is a commonly practiced catalytic reaction that produces...

  4. Horizontal well replaces hydraulic fracturing in North Sea gas well

    SciTech Connect (OSTI)

    Reynolds, D.A.; Seymour, K.P. )

    1991-11-25

    This paper reports on excessive water production from hydraulically fractured wells in a poor quality reservoir in the North SEa which prompted the drilling of a horizontal well. Gas production from the horizontal well reached six times that of the offset vertical wells, and no water production occurred. This horizontal well proved commercial the western section of the Anglia field. Horizontal drilling in the North SEa is as an effective technology to enhance hydrocarbon recovery from reservoirs that previously had proven uncommercial with other standard techniques. It is viable for the development of marginal reservoirs, particularly where conditions preclude stimulation from hydraulic fracturing.

  5. Categorical Exclusion 4567, MPLE Test Stand Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Guidelines DA 14 - Approval of technical exchange arrangements DA 15 - International umbrella agreements for energy R&D Facility Operations DB 1.2 - Training exercises and...

  6. EERE Success Story-California: SQAMD Replaces Drayage Trucks...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    emissions in the region, and studies by the California Air Resources Board and AQMD have linked emissions from the ports to very high levels of cancer risks to nearby residents. ...

  7. Project Title: X-Ray Machine Replacement Project (4552)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    exercises and simulation DB 1.3 - Routine maintenance and custodial services DB 1.4 - Air conditioning installation for existing equipment DB I.S - Cooling water system...

  8. Audit of the Replacement High Level Waste Evaporator at Savannah...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report Number: ER-B-95-04 Eastern Regional Audit Office Date of Issue: June 26, 1995 Oak ... SAVANNAH RIVER SITE Audit Report Number: ER-B-95-04 June 26, 1995 EXECUTIVE SUMMARY ...

  9. Replace V-Belts with Notched or Synchronous Belt Drives

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Synchronous belts require minimal maintenance and retensioning, operate in wet and oily ... new installations; the price premium is minimal due to the avoidance of conventional ...

  10. Cobalt discovery replaces precious metals as industrial catalyst

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    alchemical theme of transmuting base metals into precious ones. Contact Nancy Ambrosiano Communications Office (505) 699-1149 Email Catalysts are also integral to thousands of...

  11. Modeling Mechanical Behavior of a Prismatic Replaceable Reflector Block

    SciTech Connect (OSTI)

    Robert Bratton

    2009-04-01

    This report outlines the development of finite element models used to determine temperature and stresses in a prismatic core reflector block. This initial analysis determines an appropriate temperature distribution in a prismatic reflector from limiting conditions in the adjacent fuel block based on simplifying assumptions.

  12. Heavy-Duty Natural Gas Drayage Truck Replacement Program

    Broader source: Energy.gov [DOE]

    2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation

  13. Heavy-Duty Natural Gas Drayage Truck Replacement Program

    Broader source: Energy.gov [DOE]

    2010 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation Meeting, June 7-11, 2010 -- Washington D.C.

  14. Y-12 Public Warning Siren System being replaced, tested this...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    increased reliability and efficiency. The siren tests to be held Sept. 26 ensure that the public, Y-12 employees and the environment would be protected in the event of an actual...

  15. Replaced M473, M0512, M0538, M0541

    National Nuclear Security Administration (NNSA)

    M473, M0512, M0538, M0541

  16. CX-010133: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Establish Digital Density Meter Analytical Capability in 735-A, D-wing CX(s) Applied: B3.6 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  17. CX-009600: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Operation of Argon Atmosphere Furnace in 773-A, Lab C-118 CX(s) Applied: B3.6 Date: 12/10/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  18. CX-002883: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Procure and Install Analytical Chemistry Instrumentation, 773-A (B&C Wings)CX(s) Applied: B3.1Date: 06/02/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office

  19. CX-009615: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Y646 (Y189), Renovation of E-Wing Ventilation, Building 773-A CX(s) Applied: B2.1 Date: 11/09/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  20. CX-008358: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Renovation of E-Wing Ventilation, Building 773-A CX(s) Applied: B2.1 Date: 04/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  1. CX-011331: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Contained Scanning Electron Microscope, C-134/138, Building 773-A CX(s) Applied: B3.6 Date: 09/25/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  2. CX-011145: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Subcontractor Repair of Roof Leaks at 773-A CX(s) Applied: B1.3 Date: 08/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  3. CX-012611: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Operation and Maintenance of Inductively Coupled Plasma Mass Spectrometry Method in 773-A, C150 CX(s) Applied: B3.6Date: 41807 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  4. CX-005512: Categorical Exclusion Determination | Department of...

    Office of Environmental Management (EM)

    Categorical Exclusion Determination Radiation Mapping Dosimeter Exposure in Shielded Cell in 773-A: RadBall and GrayQb technologies CX(s) Applied: B3.6 Date: 02102011...

  5. CX-012558: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Roof repairs at 773-A, E-004 CX(s) Applied: B1.3Date: 41872 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  6. Is it Cost-Effective to Replace Old Eddy-Current Drives?

    SciTech Connect (OSTI)

    Not Available

    2008-07-01

    This is one in a series of tip sheets to help manufacturers optimize their industrial motor and motor-driven systems.

  7. Dry Pipe Sprinkler Piping Replacement Project (4588), 4/30/2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    engineered organisms, synthetic biology, governmentally designated noxious weeds, or invasive species, unless the proposed activity would be contained or confined in a manner...

  8. Gundrilling Oil Evaluation to Find a Replacement for 50-50

    SciTech Connect (OSTI)

    Karl Arnold

    2008-04-30

    In 2006 the gundrilling oil used at Honeywell FM&T (Federal Manufacturing and Technology) was known as 50-50. This name was selected because the oil is a mixture of two machining oils, Milpro 634 and Pennex N47. Unfortunately, Honeywell FM&T was notified that one component, Pennex N47, would be discontinued by the manufacturer. At this point the Honeywell FM&T team decided to select a single oil to eliminate mixing and procurement of two products. In addition, the team also wanted to select new oil with lower viscosity than the 50-50 mixture. Lower (than 50-50) viscosity oil was recommended by Nagel the manufacturer of the new TBT gundrilling machines. To this end Honeywell FM&T evaluated seven cutting oils in order to select a substitute that would achieve acceptable gundrilling results. This work resulted in the selection of Castrol Ilocut 334 based on cutting performance and human factors. The Castrol oil can easily achieve up to 8 holes per drill at a feed rate 30% greater than that achieved by the 50-50 oil. Once design agency approval is received, this oil will be installed as the drilling oil for all FM&T stems. This oil will also be used for other reservoir machining operations where appropriate.

  9. Hydronic Heating Retrofits for Low-Rise Multifamily Buildings - Phase 1: Boiler Control Replacement and Monitoring

    SciTech Connect (OSTI)

    Dentz, J.; Henderson, H.

    2012-04-01

    The ARIES Collaborative, a Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, MA to implement and study improvements to the heating system in one of the non-profit's housing developments. The heating control systems in the 42-unit Columbia CAST housing development were upgraded in an effort projected to reduce heating costs by 15 to 25 percent.

  10. DOI-BLM-OR-V040-2013-007-EA - Jonesboro Diversion Dam Replacement

    Broader source: Energy.gov (indexed) [DOE]

    This includes fostering the wisest use of our land and water resources, protecting our fish and wildlife, preserving the environmental and cultural values of our national parks...

  11. Study for the replacement of Kodak Royal-X Pan film

    SciTech Connect (OSTI)

    Bunker, F.J.

    1989-08-01

    Kodak Royal-X Pan (RXP) film has been the prime film for oscilloscope camera recording at the Nevada Test Site (NTS) since 1962. Kodak discontinued making this film in 1987, however, so it became necessary to find a substitute that had as many of the photographic characteristics of RXP as possible --- spectral sensitivity, image quality, recording speed, base plus fog background density, and processing parameters. (RXP and Kodak 857 developer will continue being used at NTS until the film supply is exhausted.) RXP 2{1/4} {times} 3{1/4}-inch film has been the film of choice for oscillography at NTS because of its sensitivity to the blue radiation from P-11 phosphor, which constitutes the coating of oscilloscope tubes, and its ability to record fast transient occurrences, such as oscilloscope traces, in or near nanosecond exposure times. 1 ref., 40 figs., 4 tabs.

  12. Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System

    SciTech Connect (OSTI)

    Stephens, Jessica D.

    2013-05-29

    On January 27, 2010 the City of North Little Rock, Arkansas received notification of the awarding of a Department of Energy (DOE) grant totaling $450,000 in funding from the American Recovery and Reinvestment Act (ARRA) under the Project Title: Recovery Act: Hydroelectric Facility Improvement Project – Automated Intake Clearing Equipment and Materials Management. The purpose of the grant was for improvements to be made at the City’s hydroelectric generating facility located on the Arkansas River. Improvements were to be made through the installation of an intake maintenance device (IMD) and the purchase of a large capacity wood grinder. The wood grinder was purchased in order to receive the tree limbs, tree trunks, and other organic debris that collects at the intake of the plant during high flow. The wood grinder eliminates the periodic burning of the waste material that is cleared from the intake and reduces any additional air pollution to the area. The resulting organic mulch has been made available to the public at no charge. Design discussion and planning began immediately and the wood grinder was purchased in July of 2010 and immediately put to work mulching debris that was gathered regularly from the intake of the facility. The mulch is currently available to the public for free. A large majority of the design process was spent in discussion with the Corps of Engineers to obtain approval for drawings, documents, and permits that were required in order to make changes to the structure of the powerhouse. In April of 2011, the City’s Project Engineer, who had overseen the application, resigned and left the City’s employ. A new Systems Mechanical Engineer was hired and tasked with overseeing the project. The transfer of responsibility led to a re-examination of the original assumptions and research upon which the grant proposal was based. At that point, the project went under review and a trip was booked for July 2011 to visit facilities that currently had an IMD installed. This further study of facilities revealed that the implementation of the project as originally described, while proving the benefits described in the original grant application, would likely intensify sand intake. Increased sand intake would lead to an increase in required shutdowns for maintenance and more rapid depreciation of key equipment which would result in a loss of generation capacity. A better solution to the problem, one that continued to meet the criteria for the original grant and ARRA standards, was developed. A supporting day trip was planned to visit other facilities located on the Arkansas River to determine how they were coping with the same strong amounts of sand, silt, and debris. Upon returning from the trip to other Arkansas River facilities it was extremely clear what direction to go in order to most efficiently address the issue of generator capacity and efficiency. Of the plants visited on the Arkansas River, every one of them was running what is called a rope packing shaft sealing system as opposed to mechanical shaft seals, which the facility was running. Rope packing is a time proven sealing method that has been around for centuries. It has proved to perform very well in dirty water situations just like that of the Arkansas River. In April of 2012 a scope change proposal was submitted to the DOE for approval. In August of 2012 the City received word that the change of scope had been approved. Plans were immediately set in motion to begin the conversion from mechanical seals to a packing box at the facility. Contractors arrived on October 1st, 2012 and the project team began unwatering the unit for disassembly. The seal conversion was completed on February 29th, 2013 with start-up of the unit. Further testing and adjusting was done throughout the first two weeks of March.

  13. An assessment of alternatives and technologies for replacing ozone- depleting substances at DOE facilities

    SciTech Connect (OSTI)

    Purcell, C.W.; Miller, K.B.; Friedman, J.R.; Rapoport, R.D.; Conover, D.R.; Hendrickson, P.L.; Koss, T.C.

    1992-10-01

    Title VI of the Clean Air Act, as amended, mandates a production phase-out for ozone-depleting substances (ODSs). These requirements will have a significant impact on US Department of Energy (DOE) facilities. Currently, DOE uses ODSs in three major activities: fire suppression (halon), refrigeration and cooling (chlorofluorocarbons [CFCs]), and cleaning that requires solvents (CFCs, methyl chloroform, and carbon tetrachloride). This report provides basic information on methods and strategies to phase out use of ODSs at DOE facilities.

  14. Quenching and Partitioning Process Development to Replace Hot Stamping of High Strength Automotive Steel

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. DOE Advanced Manufacturing Office Peer Review Meeting Washington, D.C. May 28-29, 2015 This presentation does not contain any proprietary, confidential, or otherwise restricted information. Project Objective  Develop high strength sheet steels for the automotive industry that can be formed at room temperature  Lean alloying to reduce cost  Practice today: Hot Stamping Process  Reheating to > 900 C and forming, quenching in die  Energy consumption associated with

  15. Global warming implications of non-fluorocarbon technologies as CFC replacements

    SciTech Connect (OSTI)

    Fischer, S.K.; Tomlinson, J.J.

    1993-12-31

    Many technologies could be developed for use in place of conventional compression systems for refrigeration and air conditioning. Comparisons of the global warming impacts using TEWI (Total Equivalent Warming Impact) can be used to identify alternatives that have the potential for lower environmental impacts than electric-driven vapor compression systems using HCFCs and HFCs. Some options, such as secondary heat transfer loops in commercial refrigeration systems to reduce refrigerant charge and emission rates, could be useful in reducing the losses of refrigerants to the atmosphere. Use of ammonia instead of a fluorocarbon in a system with a secondary loop offers only a small potential for decreasing TEWI, and this may not warrant the increased complexity and risks of using ammonia in a retail sales environment. A few technologies, such as adsorption heat pumps, have efficiency levels that show reduced TEWI levels compared to conventional and state of the art compression systems, and further development could lead to an even more favorable comparison. Health and safety risks of the alternative technologies and the materials they employ must also be considered.

  16. AEP (Central and SWEPCO)- Coolsaver A/C Tune Up or Replacement

    Broader source: Energy.gov [DOE]

    Participating customers are eligible to receive a $75 coupon for use toward A/C and heat pump efficiency services performed as a result of the program’s tune-up analysis, contractors are eligible...

  17. Replacement Capability for Disposal of Remote-Handled Low-Level...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... INTEC Idaho Nuclear Technology and Engineering Center LCF latent cancer fatality LLW ... received by specified tissues of the body and a tissue-specific weighting factor. ...

  18. Bearing repair services offer a cost-effective alternative to expensive replacement

    SciTech Connect (OSTI)

    2009-02-15

    The article, based on a presentation during MINExpo 2008, explains how advancement is bearing design, material, maintenance and repair methods have greatly improved the potential for and popularity of bearing repair as an effective way to extend bearing life. The Trinken Co. offers a variety of service options including repair, recertification, reconditioning and remanufacturing. Benefits of a quality repair program are outlined. 2 photos.

  19. A single-gradient junction technique to replace multiple-junction shifts for craniospinal irradiation treatment

    SciTech Connect (OSTI)

    Hadley, Austin; Ding, George X.

    2014-01-01

    Craniospinal irradiation (CSI) requires abutting fields at the cervical spine. Junction shifts are conventionally used to prevent setup errorinduced overdosage/underdosage from occurring at the same location. This study compared the dosimetric differences at the cranial-spinal junction between a single-gradient junction technique and conventional multiple-junction shifts and evaluated the effect of setup errors on the dose distributions between both techniques for a treatment course and single fraction. Conventionally, 2 lateral brain fields and a posterior spine field(s) are used for CSI with weekly 1-cm junction shifts. We retrospectively replanned 4 CSI patients using a single-gradient junction between the lateral brain fields and the posterior spine field. The fields were extended to allow a minimum 3-cm field overlap. The dose gradient at the junction was achieved using dose painting and intensity-modulated radiation therapy planning. The effect of positioning setup errors on the dose distributions for both techniques was simulated by applying shifts of 3 and 5 mm. The resulting cervical spine doses across the field junction for both techniques were calculated and compared. Dose profiles were obtained for both a single fraction and entire treatment course to include the effects of the conventional weekly junction shifts. Compared with the conventional technique, the gradient-dose technique resulted in higher dose uniformity and conformity to the target volumes, lower organ at risk (OAR) mean and maximum doses, and diminished hot spots from systematic positioning errors over the course of treatment. Single-fraction hot and cold spots were improved for the gradient-dose technique. The single-gradient junction technique provides improved conformity, dose uniformity, diminished hot spots, lower OAR mean and maximum dose, and one plan for the entire treatment course, which reduces the potential human error associated with conventional 4-shifted plans.

  20. In-Situ Leak Testing And Replacement Of Glovebox Isolator, Or Containment Unit Gloves

    DOE Patents [OSTI]

    Castro, Julio M. (Santa Fe, NM); Macdonald, John M. (Santa Fe, NM); Steckle, Jr., Warren P. (Los Alamos, NM)

    2004-11-02

    A test plug for in-situ testing a glove installed in a glovebox is provided that uses a top plate and a base plate, and a diametrically expandable sealing mechanism fitting between the two plates. The sealing mechanism engages the base plate to diametrically expand when the variable distance between the top plate and the bottom plate is reduced. An inlet valve included on the top plate is used to introducing a pressurized gas to the interior of the glove, and a pressure gauge located on the top plate is used to monitor the interior glove pressure.

  1. Evaluation of Technologies to Complement/Replace Mass Spectrometers in the Tritium Facilities

    SciTech Connect (OSTI)

    Tovo, L. L.; Lascola, R. J.; Spencer, W. A.; McWhorter, C. S.; Zeigler, K. E.

    2005-08-30

    The primary goal of this work is to determine the suitability of the Infraran sensor for use in the Palladium Membrane Reactor. This application presents a challenge for the sensor, since the process temperature exceeds its designed operating range. We have demonstrated that large baseline offsets, comparable to the sensor response to the analyte, are obtained if cool air is blown across the sensor. We have also shown that there is a strong environmental component to the noise. However, the current arrangement does not utilize a reference detector. The strong correlation between the CO and H{sub 2}O sensor responses to environmental changes indicate that a reference detector can greatly reduce the environmental sensitivity. In fact, incorporation of a reference detector is essential for the sensor to work in this application. We have also shown that the two sensor responses are adequately independent. Still, there are several small corrections which must to be made to the sensor response to accommodate chemical and physical effects. Interactions between the two analytes will alter the relationship between number density and pressure. Temperature and pressure broadening will alter the relationship between absorbance and number density. The individual effects are small--on the order of a few percent or less--but cumulatively significant. Still, corrections may be made if temperature and total pressure are independently measured and incorporated into a post-analysis routine. Such corrections are easily programmed and automated and do not represent a significant burden for installation. The measurements and simulations described above indicate that with appropriate corrections, the Infraran sensor can approach the 1-1.5% measurement accuracy required for effective PMR process control. It is also worth noting that the Infraran may be suitable for other gas sensing applications, especially those that do not need to be made in a high-temperature environment. Any gas with an infrared absorption (methane, ammonia, etc.) may be detected so long as an appropriate bandpass filter can be manufactured. Note that homonuclear diatomic molecules (hydrogen and its isotopes, nitrogen, oxygen) do not have infrared absorptions. We have shown that the sensor response may be adequately predicted using commercially available software. Measurement of trace concentrations is limited by the broad spectral bandpass, since the total signal includes non-absorbed frequencies. However, cells with longer pathlengths can be designed to address this problem.

  2. Hydronic Heating Retrofits for Low-Rise Multifamily Buildings: Boiler Control Replacement and Monitoring

    SciTech Connect (OSTI)

    Dentz, J.; Henderson, H.; Varshney, K.

    2013-10-01

    The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. of Cambridge, Massachusetts, to implement and study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating control systems in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded.

  3. Black Bear Prep plant replaces high-frequency screens with fine wire sieves

    SciTech Connect (OSTI)

    Barbee, C.J.; Nottingham, J.

    2007-12-15

    At the Black Bear prep plant (near Wharncliffe, WV, USA) the clean coal from the spirals traditionally reported to high-frequency screens, which removed high-ash clay fines. Screens have inherent inefficiencies that allow clean coal to report to the screen underflow. The goal of this project was to capture the maximum amount of spiral clean coal while still removing the high-ash clay material found in the spiral product. The reduction of the circulating load and plant downtime for unscheduled maintenance were projected as additional benefits. After the plant upgrade, the maintenance related to the high frequency screens was eliminated and an additional 2.27 tons per hour (tph) of fine coal was recovered, which resulted in a payback period of less than one year. The article was adapted from a paper presented at Coal Prep 2007 in April 2007, Lexington, KY, USA. 1 ref., 1 fig., 1 tab.

  4. Replacing the Whole Barrel To Reduce U.S. Dependence on Oil

    SciTech Connect (OSTI)

    2013-05-13

    This overview provides highlights of the DOE Bioenergy Technologies Office's major research, development, demonstration, and deployment activities to advance biomass conversion, technology integration in biorefineries, and supply logistics to provide a secure, sustainable supply of advanced biofuels.

  5. U.S. Nuclear Power Plants: Continued Life or Replacement After 60? (released in AEO2010)

    Reports and Publications (EIA)

    2010-01-01

    Nuclear power plants generate approximately 20% of U.S. electricity, and the plants in operation today are often seen as attractive assets in the current environment of uncertainty about future fossil fuel prices, high construction costs for new power plants (particularly nuclear plants), and the potential enactment of greenhouse gas regulations. Existing nuclear power plants have low fuel costs and relatively high power output. However, there is uncertainty about how long they will be allowed to continue operating.

  6. Quenching and Partitioning Process Development to Replace Hot Stamping of High Strength Automotive Steel

    Energy Savers [EERE]

    Emmanuel De Moor Colorado School of Mines U.S. DOE Advanced Manufacturing Office Peer Review Meeting Washington, D.C. May 6-7, 2014 This presentation does not contain any proprietary, confidential, or otherwise restricted information. Elongation (% %) Second Generation AHSS 70 60 50 40 Hot Stamping Mild 30 BH 20 10 MART Before hardening 0 0 300 600 600 900 1200 1600 Tensile Strength (MPa) Elongation ( ) Develop High Strength Formable Steels � � Develop High Strength Sheet Steels for the

  7. Replacement of petroleum based hydraulic fluids with a soybean-based alternative

    SciTech Connect (OSTI)

    Rose, B.; Rivera, P.

    1998-05-01

    Despite the best preventative measures, ruptured hoses, spills and leaks occur with use of all hydraulic equipment. Although these releases do not usually produce a RCRA regulated waste, they are often a reportable occurrence. Clean-up and subsequent administrative procedure involves additional costs, labor and work delays. Concerns over these releases, especially related to Sandia National Laboratories (SNL) vehicles hauling waste on public roads prompted Fleet Services (FS) to seek an alternative to the standard petroleum based hydraulic fluid. Since 1996 SNL has participated in a pilot program with the University of Iowa (UNI) and selected vehicle manufacturers, notably John Deere, to field test hydraulic fluid produced from soybean oil in twenty of its vehicles. The vehicles included loaders, graders, sweepers, forklifts and garbage trucks. Research was conducted for several years at UNI to modify and market soybean oils for industrial uses. Soybean oil ranks first in worldwide production of vegetable oils (29%), and represents a tremendous renewable resource. Initial tests with soybean oil showed excellent lubrication and wear protection properties. Lack of oxidative stability and polymerization of the oil were concerns. These concerns were being addressed through genetic alteration, chemical modification and use of various additives, and the improved lubricant is in the field testing stage.

  8. Electrophoretic detection and separation of mutant DNA using replaceable polymer matrices

    DOE Patents [OSTI]

    Karger, Barry L.; Thilly, William G.; Foret, Frantisek; Khrapko, Konstaintin; Koehavong, Phouthone; Cohen, Aharon S.; Giese, Roger W.

    1997-01-01

    The disclosure relates to a method for resolving double-stranded DNA species differing by at least one base pair. Each of the species is characterized by an iso-melting domain with a unique melting temperature contiguous with a melting domain of higher thermal stability.

  9. Electrophoretic detection and separation of mutant DNA using replaceable polymer matrices

    DOE Patents [OSTI]

    Karger, B.L.; Thilly, W.G.; Foret, F.; Khrapko, K.; Koehavong, P.; Cohen, A.S.; Giese, R.W.

    1997-05-27

    The disclosure relates to a method for resolving double-stranded DNA species differing by at least one base pair. Each of the species is characterized by an iso-melting domain with a unique melting temperature contiguous with a melting domain of higher thermal stability. 18 figs.

  10. Replacement of chlorofluorocarbons (CFCs) at the DOE gaseous diffusion plants: An assessment of global impacts

    SciTech Connect (OSTI)

    Socolof, M.L.; Saylor, R.E.; McCold, L.N.

    1994-06-01

    The US Department of Energy (DOE) formerly operated two gaseous diffusion plants (GDPs) for enriching uranium and maintained a third shutdown GDP. These plants maintain a large inventory of dichlorotetrafluorethane (CFC-114), a cholorofluorocarbon (CFC), as a coolant. The paper evaluates the global impacts of four alternatives to modify GDP coolant system operations for a three-year period beginning in 1996. Interim modification of GDP coolant system operations has the potential to reduce stratospheric ozone depletion from GDP coolant releases while a permanent solution is studied.

  11. Fact #568: April 27, 2009 For Modern Cars, Replacing an Air Filter...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    performance benefits to changing a clogged air filter on modern vehicles such as the Toyota Camry, Buick Lucerne, and Dodge Charger. For more detailed information, see the table...

  12. Replaced M236, M333, M473, M0512, M0538, M0541, M552

    National Nuclear Security Administration (NNSA)

    M236, M333, M473, M0512, M0538, M0541, M552

  13. CX-006319: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Install Leased Bulk Argon Tank on West Side of 735-A D-WingCX(s) Applied: B1.15Date: 07/06/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office

  14. Phlogopite and Quartz Lamellae in Diamond-bearing Diopside from Marbles of the Kokchetav Massif Kazakhstan: Exsolution or Replacement Reaction

    SciTech Connect (OSTI)

    L Dobrzhinetskaya; R Wirth; D Rhede; Z Liu; H Green

    2011-12-31

    Exsolution lamellae of pyroxene in garnet (grt), coesite in titanite and omphacite from UHPM terranes are widely accepted as products of decompression. However, interpretation of oriented lamellae of phyllosilicates, framework silicates and oxides as a product of decompression of pyroxene is very often under debate. Results are presented here of FIB-TEM, FEG-EMP and synchrotron-assisted infrared (IR) spectroscopy studies of phlogopite (Phlog) and phlogopite + quartz (Qtz) lamellae in diamond-bearing clinopyroxene (Cpx) from ultra-high pressure (UHP) marble. These techniques allowed collection of three-dimensional information from the grain boundaries of both the single (phlogopite), two-phase lamellae (phlogopite + quartz), and fluid inclusions inside of diamond included in K-rich Cpx and understanding their relationships and mechanisms of formation. The Cpx grains contain in their cores lamellae-I, which are represented by topotactically oriented extremely thin lamellae of phlogopite (that generally are two units cell wide but locally can be seen to be somewhat broader) and microdiamond. The core composition is: (Ca{sub 0.94}K{sub 0.04}Na{sub 0.02})(Al{sub 0.06}Fe{sub 0.08}Mg{sub 0.88})(Si{sub 1.98}Al{sub 0.02})O{sub 6.00}. Fluid inclusions rich in K and Si are recognized in the core of the Cpx, having no visible connections to the lamellae-I. Lamellar-II inclusions consist of micron-size single laths of phlogopite and lens-like quartz or slightly elongated phlogopite + quartz intergrowths; all are situated in the rim zone of the Cpx. The composition of the rim is (Ca{sub 0.95}Fe{sub 0.03}Na{sub 0.02})(Al{sub 0.05}Fe{sub 0.05}Mg{sub 0.90})Si{sub 2}O{sub 6}, and the rim contains more Ca, Mg than the core, with no K there. Such chemical tests support our microstructural observations and conclusion that the phlogopite lamellae-I are exsolved from the K-rich Cpx-precursor during decompression. It is assumed that Cpx-precursor was also enriched in H{sub 2}O, because diamond included in the core of this Cpx contains fluid inclusions. The synchrotron IR spectra of such diamond record the presence of OH{sup -} stretching and H{sub 2}O bending motion regions. Lamellar-II inclusions are interpreted as forming partly because of modification of the lamellae-i in the presence of fluid enriched in K, Fe and Si during deformation of the host diopside; the latter is probably related to the shallower stage of exhumation of the UHP marble. This study emphasizes that in each case to understand the mechanism of lamellar inclusion formation more detailed studies are needed combining both compositional, structural and three-dimensional textural features of lamellar inclusions and their host.

  15. Replacement of lead-loaded glovebox glove with attenuation medium that are not RCRA-hazardous metals

    SciTech Connect (OSTI)

    Cournoyer, Michael E; George, Gerald L; Dodge, Robert L; Chunglo, Steve

    2010-01-01

    Programmatic operations at the Los Alamos National Laboratory Plutonium Facility (TA-55) involve working with various amounts of plutonium and other highly toxic, alpha-emitting materials. The spread of radiological contamination on surfaces, airborne contamination, and excursions of contaminants into the operator's breathing zone are prevented through the use of a variety of gloveboxes (the glovebox, coupled with an adequate negative pressure gradient, provides primary confinement). Radiation shielding is commonly used to protect the glovebox worker from unintentional direct and secondary radiation exposure, while working with plutonium-238 and plutonium-239. In these environments, low-energy photons, i.e., those less than 250 keY, are encountered. Shielding glove box gloves are traditionally composed of lead-based materials, but these are now considered hazardous waste. This has prompted the development of new, nonhazardous- shielding gJovebox gloves. No studies, however, have investigated the effectiveness of these new glovebox gloves. We examined both leaded and nonhazardous- shielding glovebox gloves and compared their attenuation effectiveness over the energy range of interest at TA-55. All measurements are referenced to lead sheets, allowing direct comparisons to the common industry standard of 0.1 mm lead equivalent material. The attenuation properties of both types of glovebox gloves vary with energy, making it difficult for manufacturers to claim lead equivalency across the entire energy range used at TA-55. The positions of materials' photon energy absorption edges, which are particularly important to improved attenuation performance, depending upon the choice of radiation energy range, are discussed. This effort contributes to the Los Alamos National Laboratory Continuous Improvement Program by improving the efficiency, cost effectiveness, and formality of glovebox operations.

  16. CX-004805: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    773-A C-150 and B-142/146 Inductively Coupled Plasma Mass Spectrometer (ICP-MS) InstallationCX(s) Applied: B3.6Date: 11/12/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office

  17. CX-001383: Categorical Exclusion Determination | Department of Energy

    Energy Savers [EERE]

    1383: Categorical Exclusion Determination CX-001383: Categorical Exclusion Determination Building 212 Electron Microscopy Improvements CX(s) Applied: B2.1 Date: 04/05/2010 Location(s): Illinois Office(s): Science, Argonne Site Office This project will demolish the existing heating, ventilating, and air conditoning (HVAC) systems within the D Wing of Building 212 (Electron Microscopy Area). Included in this demolition are 5-fancoil units and associated duct work, and duct work missing boxes.

  18. Volume II solicitation package for solicitation no. 522887-5422 {open_quotes}site electrical replacements & substation{close_quotes} subproject: 69 KV substation

    SciTech Connect (OSTI)

    1991-05-03

    This solicitation is for the U.S. Department of Energy under Prime Contract No. DE-AC04-88-DP43495 with EG&G Mound Applied Technologies. Ohio Sales or Use taxes are not to be included in the proposal price. Applicable taxes due or owing to the State of Ohio will be paid by the buyer under Direct Payment Permit No. 98-002230. Refer to Form ML-2487, General Provisions, Article 24, {open_quotes}Federal, State & Local Taxes{close_quotes}. Sellers are advised that purchases of building and construction materials for incorporation into a structure or improvement to a real property which is accepted for ownership by the United States or one of its agencies are exempt from Ohio Sales and Use taxes. Unnecessarily elaborate brochures or other presentations beyond those sufficient to present a complete and effective response to this solicitation are not desired and may be construed as an indication of the seller`s lack of cost consciousness. Elaborate art work, expensive paper and binding, and expensive visual and other presentation aids are neither necessary nor wanted.

  19. DOE issues Finding of No Significant Impact on Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low Level Radioactive Waste Generated at Idaho Site

    Broader source: Energy.gov [DOE]

    Idaho Falls, ID After completing a careful assessment, the U.S. Department of Energy has determined that building a new facility at its Idaho National Laboratory site for continued disposal of remote-handled low level radioactive waste generated by operations at the site will not have a significant impact on the environment.

  20. Huntington Veterans Affairs Medical Center - Faucet and Showerhead Replacement Project: Best Management Practice Case Study #7: Faucets and Showerheads, Federal Energy Management Program (FEMP) (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2009-12-01

    Case study overview of the Huntington Veterans Affairs Medical Center water efficiency program as part of FEMP's water efficiency best management practice series.

  1. Synthesis of metal-metal oxide catalysts and electrocatalysts using a metal cation adsorption/reduction and adatom replacement by more noble ones

    DOE Patents [OSTI]

    Adzic, Radoslav; Vukmirovic, Miomir; Sasaki, Kotaro

    2010-04-27

    The invention relates to platinum-metal oxide composite particles and their use as electrocatalysts in oxygen-reducing cathodes and fuel cells. The invention particularly relates to methods for preventing the oxidation of the platinum electrocatalyst in the cathodes of fuel cells by use of these platinum-metal oxide composite particles. The invention additionally relates to methods for producing electrical energy by supplying such a fuel cell with an oxidant, such as oxygen, and a fuel source, such as hydrogen. The invention also relates to methods of making the metal-metal oxide composites.

  2. EIS-0350: Final Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory Los Alamos, New Mexico

    Broader source: Energy.gov [DOE]

    The CMRR EIS examines the potential environmental impacts associated with the Proposed Action of consolidating and relocating the mission-critical CMR capabilities from a degraded building to a new modern building(s).

  3. Notice of Intent to Cancel DOE O 3750.1, Work Force Discipline and Replace with DOE O 333.1, Employee Management Relations (Workforce Discipline)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-08-21

    The proposed new Order would cancel DOE O 3750.1, dated 3-23-1998, which is severely outdated and deficient in addressing Genetic Information Non-discrimination Act (GINA), addressing Reprisal (verify), protections and entitlements under the Whistle Blower Act, 2014 Hatch Act changes, Nepotism, Executive Memorandums regarding issues such as texting while driving and current workforce issues as well as Merit Systems Protection Board (MSPB) preferred standards.

  4. U.S. Department of Energy Categorical Exclusion Determination Form

    Office of Environmental Management (EM)

    Operation of the XRF (X-ray Fluorescence) Laboratory (773A C142/146) Savannah River Site Aiken/Aiken/South Carolina Operations in the X-ray Fluorescence (XRF) laboratory consists of the following activities: wavelength dispersive xrf analysis, clean particle size analyzer, glass disk apparatus for preparing samples for xrf analysis, grinder/polisher instrument, mills, and various furnaces. B3.6 - Small-scale research and development, laboratory operations, and pilot projects Andrew R. Grainger

  5. Microsoft Word - 2015-05-08_SRNL Enviro Sci and Biotechn Support of WIPP

    Office of Environmental Management (EM)

    SRNL-TR-20015-00121 Date: May 8, 2015 From: Robin L. Brigmon 999-W (819-8405/19384) Charles E. Milliken 999-W (803) 819-8426 John J. Mayer 773-42A (803) 725-5991 To: David Hobbs 773-A Sheryl Bush 773-42A Subject: SRNL Environmental Sciences and Biotechnology Support of WIPP (R.L. Brigmon and C. E. Milliken) The Environmental Sciences and Biotechnology (ESB) group was consulted concerning the potential for biological activity, e.g., microbial heating and gas production, contributing to the Waste

  6. Categorical Exclusion Determination Form Project Title: Program or Program Office:

    Office of Environmental Management (EM)

    radiation mapping dosimeter will be placed in a shielded cell in 773-A E-wing Shielded Cell Operations (SCO) facility for in-cell exposure to ambient radiation. Either the RadBall or GrayQb technologies will be selected for deployment; details of these two radiation mapping technologies are discussed below. --The RadBall consists of an inner spherical core made of a radiation sensitive polymer and an outer tungsten based collimation sheath. --The GrayQb is a alternate type of radiation mapping

  7. CX-010117: Categorical Exclusion Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10117: Categorical Exclusion Determination CX-010117: Categorical Exclusion Determination Analytical Methods for Radiochemical Measurements CX(s) Applied: B3.6 Date: 03/28/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office This EEC covers analytical methods to be performed in 773-A Labs B-003, B-046, B-138, B-142, B-145, B-154 and B-155. Methods include separation of Alpha-emitting isotopes (Plutonium, Neptunium, Uranium and Americium) for the purpose of measurements,

  8. 2014 4th Qtr Package

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hydro system replacements, transmission expansion and replacements, energy efficiency, fish and wildlife, and information technology projects. Power Services Power Services...

  9. 2013 4th Qtr Package

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hydro system replacements, transmission expansion and replacements, energy efficiency, fish and wildlife, and information technology projects. Power Services Power Services...

  10. September 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hydro system replacements, transmission expansion and replacements, energy efficiency, fish and wildlife, and information technology projects. Power Services Power Services...

  11. August 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hydro system replacements, transmission expansion and replacements, energy efficiency, fish and wildlife, and information technology projects. Power Services Power Services...

  12. FMC Presentation September

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hydro system replacements, transmission expansion and replacements, energy efficiency, fish and wildlife, and information technology projects. Energy Efficiency capital spending...

  13. Slide 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (e.g. training replacement workers; compensating replacement workers; repairing damaged property; accident investigation; implementation of corrective action; scheduling delays...

  14. Radiological/biological/aerosol removal system

    DOE Patents [OSTI]

    Haslam, Jeffery J

    2015-03-17

    An air filter replacement system for existing buildings, vehicles, arenas, and other enclosed airspaces includes a replacement air filter for replacing a standard air filter. The replacement air filter has dimensions and air flow specifications that allow it to replace the standard air filter. The replacement air filter includes a filter material that removes radiological or biological or aerosol particles.

  15. S. 943: A Bill to amend the Surface Mining Control and Reclamation Act of 1977 to facilitate the use of abandoned mine reclamation fund moneys to replace water supplies that have been contaminated or diminished by coal mining practices. Introduced in the Senate of the United States, One Hundred First Congress, First Session, May 9, 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01

    The bill describes mandatory and discretionary allocations of funds to a state or Indian reservation for the purpose of water reclamation. The stated objectives of the Surface Mining Control and Reclamation Act are amended to allow 50 percent of a state's mandatory allocation to be used for the construction of public water treatment plants and distribution facilities to take the place of water supplies that have been contaminated as a result of coal practices undertaken prior to August 3, 1977, regardless of whether the contamination has been exacerbated by coal mining practices since that date, when construction would be more economical than repair of existing facilities.

  16. Building America Technology Solutions for New and Existing Homes...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Replacing Resistance Heating with Mini-Split Heat Pumps Building America Technology Solutions for New and Existing Homes: Replacing Resistance Heating with Mini-Split Heat Pumps In ...

  17. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Palisades Turbine Rehabilitation and Runner Replacement This project will rehabilitate the turbines and replace the turbine runners on the four units at the Palisades powerhouse....

  18. WIPP UPDATE: April 21, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    employees on replacing the high-efficiency particulate air (HEPA) filters - a crucial component of the WIPP Ventilation System. New filters are required to replace those that...

  19. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Replacement This project will upgrade the 14 governors in the McNary powerhouse with digital controls along with replacement of associated components. Governor upgrades are a...

  20. Bench-Scale Cross Flow Filtration of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Spectrometer (APS) to Replace Optical Particle Counter (OPC) at Southern Great Plains John Ogren suggested replacing the aging optical particle counter (OPC) included in the...

  1. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fleet Equipment Replacement FY 14 - 15 The equipment replacements identified in this investment will increase efficiency, increase electrical crew and fleet capabilities, reduce...

  2. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - Schultz Fiber Replacement This project will replace and upgrade of 360 miles of fiber optic cable between the Ross complex and the Franklin and Schultz substations. The project...

  3. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transformer Replacements G11 - G18 This investment will replace all the transformers in the Right Powerplant - 24 single- phase units. There is currently a separate project...

  4. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Columbia Vista Short Term Replacement This investment will replace short-term and real time hydro modeling capabilities. Some of the issues with the current system are: * It's...

  5. Building America Technology Solutions for New and Existing Homes...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Replacing Resistance Heating with Mini-Split Heat Pumps Building America Technology Solutions for New and Existing Homes: Replacing Resistance Heating with Mini-Split Heat Pumps In...

  6. New Rules Help Pocahontas Brighten Streets | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The City of Pocahontas, Iowa swill replace sodium streetlights with LED fixtures. | File photo The City of Pocahontas, Iowa swill replace sodium streetlights with LED fixtures. |...

  7. Maintaining Your Air Conditioner | Department of Energy

    Office of Environmental Management (EM)

    Your Air Conditioner Replacing or cleaning air conditioner filters is a critical maintenance task. | Photo courtesy of iStockphotofiremanYU. Replacing or cleaning air...

  8. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    efficiency in eligible businesses. Prescriptive rebates are available for furnace and boiler replacements, insulation, doors, water heater replacement, ENERGY STAR set back...

  9. TVA Partner Utilities - eScore Program | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    - 150Unit (No Limit) Geothermal Heat Pump Replacement - 500Unit (No Limit) Dual Fuel Heat Pump Replacement - 250Unit (No Limit) Subsidized Energy Audit Price- 75...

  10. TVA Partner Utilities - eScore Program | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    - 150Unit (No Limit) Geothermal Heat Pump Replacement - 500Unit (No Limit) Dual Fuel Heat Pump Replacement - 250Unit (No Limit) Energy Audit- 75 Summary The...

  11. Energy Savings Performance Contracts (4494)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    replace approximately 760 steam traps and 60 vacuum breakers; update the condensate return system with pipe, insulation, and pumptank units; replace pumps and install controls in...

  12. PRESENTATION TITLE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    components like gear boxes and drums sometimes less expensive to replace than fix Cab is often replaced, depends on whether operators need significant changes. BUILDING...

  13. Building America Technology Solutions for New and Existing Homes...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Replacement, Variable-Speed Motors for Furnaces, Syracuse, New York, (Fact Sheet) Building America Technology Solutions for New and Existing Homes: Replacement, Variable-Speed ...

  14. Black Hills Energy (Gas) - Residential Energy Efficiency Rebate...

    Broader source: Energy.gov (indexed) [DOE]

    State Iowa Program Type Rebate Program Rebate Amount Energy Evaluation: Free Clothes Washers: 100 Dishwashers: 20 Replacement Furnaces: 250 - 400 Replacement...

  15. Libby (FEC)-Troy 115kV Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Runner Replacements This project will refurbish the turbines and replace the turbine runners on units 1 - 16 at Chief Joseph. The drivers for this project are reliability and...

  16. Tax Credits, Rebates & Savings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    loans can be used for a variety of energy saving projects, including solar water heaters, heat pump systems, duct sealing or replacement, replacement windows, and weatherization...

  17. Fort Rucker UESC Energy Conservation Project, Completed Dec....

    Energy Savers [EERE]

    the existing 40 ton DX * Replaced the AHU * Replaced the steam boiler with hot water boiler * Installed Controls * Installed dedicated AHU to serve a meeting room * Solved...

  18. Microsoft Word - KCP SEC J_Appendix K - Small Business SubK Plan 001

    National Nuclear Security Administration (NNSA)

    K, Page 1 SECTION J APPENDIX K SMALL BUSINESS SUBCONTRACTING PLAN Plan: As attached below. Replaced Mod 002 dated 1/5/11 (Replaced Mod 002)

  19. EA-1497: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Strategic Petroleum Reserve West Hackberry Facility Raw Water Intake Pipeline Replacement, Cameron and Calcasieu Parishes, Louisiana

  20. EIS-0350: DOE Notice of Availability of the Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico

  1. EIS-0350: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico

  2. EIS-0350: Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico

  3. Ashland Electric Utility - Residential Energy Efficiency Loan...

    Broader source: Energy.gov (indexed) [DOE]

    is 7,500. The loans can be used for a variety of energy saving projects, including solar water heaters, heat pump systems, duct sealing or replacement, replacement windows, and...

  4. Reduce Hot Water Use for Energy Savings | Department of Energy

    Office of Environmental Management (EM)

    with shut-off valves that allow you to stop the flow of water without affecting the temperature. When replacing an aerator, bring the one you're replacing to the store with you to...

  5. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P25 Two Way Mobile Radio Replacement The majority of BPA's fixed radio equipment is at least 20 years old. The manufacturer no longer supports the system or provides replacement...

  6. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Switchgear Replacement for Fault Duty FY12 This project is a key element of the AC Substation strategy and replaces high priority, high risk of failure and costly to maintain...

  7. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ice Harbor Units 1, 2, 3 Turbine Redesign and Runner Replacement This project will replace turbines and runners on units 1 - 3. The turbines and runners will be designed to improve...

  8. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hungry Horse Station Service Replacement This project will replace the station service 2300V power distribution board and 13.8kV cables installed as original equipment (circa 1950)...

  9. Understanding Earths Energy Sources, Part 1. Nonrenewable Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    be replaced in a short period replaced in a short period of time. 2 3 4 Fossil Fuels N bl b b d f l d f h Nonrenewable carbon based fuels made from the remains of...

  10. Save Energy this Independence Day | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on lighting costs. Replacing 15 inefficient incandescent bulbs in your home with energy-saving bulbs could save you about 50 per year. For the greatest savings, replace your old...

  11. Microsoft Word - DOE-ID-13-010 Kansas State B2-2.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    upgrades include: a new water radiation monitor to help detect failed fuel, a new primary water pump to replace the existing pump, and a new secondary water tank to replace the...

  12. Save Energy this Independence Day | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Replacing 15 inefficient incandescent bulbs in your home with energy-saving bulbs could save you about 50 per year. For the greatest savings, replace your old incandescent bulbs ...

  13. Capital Projects Estimated >$7 Million in Direct Costs Business

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transformer Replacement G1, G3,G5-8 Federal Hydro *-- Sustain Replace the existing transformers. Black Canyon Units 1 & 2 Upgrades Federal Hydro *-- Sustain Upgrades to increase...

  14. Savannah River Nuclear Solutions S A V A N N A H R I V E R S

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to replace the 68 failed coils and repair the other systems. FOR IMMEDIATE RELEASE A crane performs a critical lift to replace a heavy heating and cooling coil that was damaged...

  15. North Village Ground Source Heat Pumps

    Broader source: Energy.gov [DOE]

    Overview: Installation of Ground Source Heat Pumps. Replacement of Aging Heat Pumps. Alignment with Furmans Sustainability Goals.

  16. Assessment of Unglazed Solar Domestic Water Heaters

    SciTech Connect (OSTI)

    Burch, J.; Salasovich, J.; Hillman, T.

    2005-12-01

    Conference paper investigating cost-performance tradeoffs in replacing glazed collectors with unglazed collectors in solar domestic water heating systems.

  17. Novel Direct Steelmaking by Combining Microwave, Electric Arc, and Exothermal Heating Technologies

    SciTech Connect (OSTI)

    2002-06-01

    New Technology May Replace Conventional Steelmaking Resulting in Significant Energy and Operating Cost Savings While Reducing Emissions.

  18. EA-1679: Preliminary Environmental Assessment

    Broader source: Energy.gov [DOE]

    Grand Coulee’s Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

  19. 2015 4th Qtr Package

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    transmission system expansion and replacements, large energy efficiency projects, fish and wildlife facilities, and new information technology systems. Power Services ...

  20. EA-1634: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Lawrence Berkeley National Laboratory Seismic Life-Safety Modernization, and Replacement of General Purpose Buildings, Phase 2B

  1. DOE Awards Native American, Tribally-Owned Small Business Contract...

    Broader source: Energy.gov (indexed) [DOE]

    Services Moving and Transportation Services Information Technology Records Management Printing Services Public Participation Support This award will replace eight smaller...

  2. Building America Technology Solutions for New and Existing Homes...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This guide, developed by Consortium for Advanced Residential Buildings, provides ... Replacement for Hydronically Heated Multifamily Buildings, Cambridge, Massachusetts

  3. Building America Technology Solutions for New and Existing Homes...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cambridge, Massachusetts Building America Technology Solutions for New and Existing Homes: Boiler Control Replacement for Hydronically Heated Multifamily Buildings, Cambridge, ...

  4. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    commercial customers for the purchase and installation of energy efficiency lighting, clothes washers, dishwashers, replaced refrigerators, new... Eligibility: Commercial, Local...

  5. Department of Energy Announces Philips Lighting North America as Winner of L Prize Competition

    Broader source: Energy.gov [DOE]

    Philips Product Delivers on Department's Challenge to Replace Common Light Bulb with Energy-Saving Lighting Alternative

  6. EIS-0350-S1: EPA Notice of Availability of the Draft Supplemental Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico

  7. EIS-0350-S1: Amended Record of Decision

    Broader source: Energy.gov [DOE]

    Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, NM

  8. EA-1679: Revision Sheet for Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Grand Coulee’s Third Power plant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

  9. Enzyme Detectives Uncover New Reactions, Products

    ScienceCinema (OSTI)

    John Shanklin

    2010-01-08

    Brookhaven biochemist John Shanklin discusses the engineering of biofuels and plant-derived replacements for petro-chemicals.

  10. Hot Pot Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    of Replacement Wells: Average Temperature of Geofluid: Sanyal Classification (Wellhead): Reservoir Temp (Geothermometry): Reservoir Temp (Measured): Sanyal Classification...

  11. Tungsten Mountain Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    of Replacement Wells: Average Temperature of Geofluid: Sanyal Classification (Wellhead): Reservoir Temp (Geothermometry): Reservoir Temp (Measured): Sanyal Classification...

  12. McGuinness Hills Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    of Replacement Wells: Average Temperature of Geofluid: Sanyal Classification (Wellhead): Reservoir Temp (Geothermometry): Reservoir Temp (Measured): Sanyal Classification...

  13. Jersey Valley Geothermal Area | Open Energy Information

    Open Energy Info (EERE)

    of Replacement Wells: Average Temperature of Geofluid: Sanyal Classification (Wellhead): Reservoir Temp (Geothermometry): Reservoir Temp (Measured): Sanyal Classification...

  14. EA-1679: Mitigation Action Plan

    Broader source: Energy.gov [DOE]

    Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

  15. Sandia National Laboratories is a multi-program laboratory managed...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    replacement and modification of buildings, structures, and utility systems; refurbishment of fire protection systems; and improvement or installation of modern...

  16. Refurbishment | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Refurbishment Refurbishment Through Life Extension Program activities, Y-12 produces refurbished, replaced andor upgraded weapons components for modernizing the enduring...

  17. New Boilers, Big Savings for Minnesota County

    Broader source: Energy.gov [DOE]

    Why simply replacing the boilers at the Sherburne County Courthouse in Minnesota is going to save big.

  18. High Thermal Conductivity Polymer Composites for Low-Cost Heat...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    future heat exchanger development. (1 year project - ... available state of the art) Enable replacement of ... transfer UTRC Innovation Process CURRENT ...

  19. Preventive Maintenance Strategies for Compressed Air Systems

    Broader source: Energy.gov [DOE]

    This tip sheet discusses preventive maintenance strategies for compressed air systems to avoid high equipment repair and replacement costs.

  20. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    equipment (nozzles, gaskets, regulators, sprays, drains, hubs, etc), irrigation motor replacements, and variable frequency drives for small milking machines. Specific...

  1. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    offerings, provides incentives for commercial customers to replace old equipment with new, more efficient... Eligibility: Commercial, Industrial Savings Category: Clothes...

  2. Building America Technology Solutions for New and Existing Homes:

    Energy Savers [EERE]

    Replacement, Variable-Speed Motors for Furnaces, Syracuse, New York, (Fact Sheet) | Department of Energy Replacement, Variable-Speed Motors for Furnaces, Syracuse, New York, (Fact Sheet) Building America Technology Solutions for New and Existing Homes: Replacement, Variable-Speed Motors for Furnaces, Syracuse, New York, (Fact Sheet) In this project, the CARB team tested the Concept 3 replacement motors for residential furnaces in eight homes in and near Syracuse, New York, to test how these

  3. EIS-0350-S1: EPA Notice of Availability of the Final Supplemental Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico

  4. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Clean Truck Replacement Program The Regional Truck Replacement Program (Program) through the Port Authority of New York & New Jersey provides funding for up to 50% of the cost to replace a heavily emitting truck, up to $25,000. Preference is given to trucks with Model Year 1994 to 1997 engines and funding is limited to two replacement trucks per eligible applicant. Eligible recipients include independent owner operators and licensed motor carriers servicing the port with drayage trucks

  5. Executive Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Replace Leaking Catalyst System RTBF-MRR GPP 1,300 2,000 Replace TCAP Recovery Bed C&D RTBF-MRR GPP 300 1,350 Replace HT-TCAP Prod Bed 300, 400, 500 RTBF-MRR GPP 350...

  6. Building America Technology Solutions for New and Existing Homes: Boiler

    Energy Savers [EERE]

    Control Replacement for Hydronically Heated Multifamily Buildings, Cambridge, Massachusetts | Department of Energy Boiler Control Replacement for Hydronically Heated Multifamily Buildings, Cambridge, Massachusetts Building America Technology Solutions for New and Existing Homes: Boiler Control Replacement for Hydronically Heated Multifamily Buildings, Cambridge, Massachusetts The ARIES Collaborative partnered with Homeowners' Rehab Inc., a nonprofit affordable housing owner, to upgrade the

  7. Microsoft Word - Final Report 11-29-05.doc

    Office of Environmental Management (EM)

    Demolition and Replacement of Hanford's Radiological Calibration Laboratory DOE/IG-0711 December 2005 REPORT ON DEMOLITION AND REPLACEMENT OF HANFORD'S RADIOLOGICAL CALIBRATION LABORATORY TABLE OF CONTENTS Demolition and Replacement of Calibration Laboratory Details of Finding 1 Recommendations and Comments 5 Appendices 1. Objective, Scope, and Methodology 7 2. Prior Audit Reports 9 3. Management Comments 10 ____________________________________________________________ Page 1 Details of Finding

  8. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Minnesota Biofuels Replacement Goals The Minnesota Department of Weights and Measures promotes the replacement of petroleum used in the state with the goal that biofuels will account for at least the specified percentage of all gasoline offered for sale by the dates below: Calendar Year Biofuel Replacement Schedule 2015 14% 2017 18% 2020 25% 2025 30% (Reference Minnesota Statutes 239.791

  9. Buildings Energy Data Book: 2.6 Residential Home Improvement

    Buildings Energy Data Book [EERE]

    6 2010-2011 National Professional Remodeling Cost and Amount Recouped in Resale Value Envelope Siding Replacement - Vinyl 11.4 8.2 72% Window Replacement - Vinyl 11.1 7.9 72% Window Replacement - Wood 12.0 8.7 72% Roofing Replacement 21.5 12.8 60% Entry Door Replacement - Fiberglass 3.6 2.1 60% Entry Door Replacement - Steel 1.2 1.2 102% Remodel Minor Kitchen Remodel 21.7 15.8 73% Major Kitchen Remodel 58.4 40.1 69% Bathroom Remodel 16.6 10.7 64% Attic Bedroom Remodel 51.4 37.1 72% Basement

  10. EA-1568: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    8: Final Environmental Assessment EA-1568: Final Environmental Assessment Replacement Source of Steam for A Area at the Savannah River Site The U.S. Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts of the proposed construction and operation of a replacement steam plant in A Area at the Savannah River Site (SRS). PDF icon Environmental Assessment for the Replacement Source of Steam for A Area at the Savannah River Site,

  11. Microsoft Word - DOE-ID-INL-14-016.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    16 SECTION A. Project Title: Advanced Test Reactor (ATR) Primary Coolant Pump Motor Starters Replacement SECTION B. Project Description: The proposed action would replace the existing ATR Primary Coolant Pump circuit breakers located in Switchgear 670-E-1 Cubicle 3 & 4 and Switchgear 670-E-2, Cubicles 9 and 10 with Vacuum Starters specifically designed for motor starting applications. Replace the existing electrically operated auxiliary relay with a new electrically operated auxiliary relay

  12. Microsoft Word - DOE-ID-INL-15-010.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 SECTION A. Project Title: Advanced Test Reactor Air Conditioning Upgrades SECTION B. Project Description: The proposed action will replace the air conditioning (AC) units in multiple areas located within the Advanced Test Reactor (ATR) [Test Reactor Area (TRA)-670]. The units considered for replacement are the following: AC units in Reactor Data Acquisition System (RDAS) rooms 110 and 111: Scope consists of replacing the three (3) equipment cooling AC units with four (4) new and more efficient

  13. Microsoft Word - DOE-ID-INL-15-014.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 SECTION A. Project Title: Test Reactor Area (TRA)-609 Switchgear Replacement, Rollup Door Installation, and Diesel Removal SECTION B. Project Description: TRA-609 houses the air compressors and much of the electrical switchgear for equipment in the outer area of the Advanced Test Reactor (ATR). The switchgear equipment is nearing the end of its useful life and needs to be replaced. The proposed work scope is to replace the electrical switchgear with a new, functionally equivalent piece of

  14. Microsoft Word - DOE-ID-INL-15-020.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 SECTION A. Project Title: Replacement of Test Reactor Area (TRA)-671 Chemistry Monitoring Unit and Modification of Piping and Components SECTION B. Project Description: Nalco has been awarded the secondary chemistry support contract for the Advanced Test Reactor (ATR). To implement the Nalco chemistry program, the following replacements and modifications must be made to the ATR Cooling Tower Pumphouse (TRA-671): 1. The chemistry monitoring unit in TRA-671 pump room would be replaced with a new

  15. Microsoft Word - DOE-ID-INL-15-032.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 SECTION A. Project Title: Advanced Test Reactor (ATR) Cold Waste Collection Tank 670-M-186 Vessel Replacement SECTION B. Project Description: The 670-M-186 vessel to the ATR cold waste collection tank has a history of developing leaks. Ultrasonic thickness testing performed on the vessel found excessive wall thinning due to corrosion. The technical evaluation completed in 2015 determined the vessel needs to be replaced. The proposed action would replace the 670-M-186 vessel with a new

  16. Microsoft Word - DOE-ID-INL-16-003.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 SECTION A. Project Title: Test Area North (TAN)-614 Potable Water Pump Replacement SECTION B. Project Description and Purpose: The TAN-614 potable 75 hp water pump has become unreliable, fails on occasion and needs to be replaced. The proposed action would remove the old potable water pump, associated parts (motor, controller, starter, etc.) and the interlock between the potable water pump and fire pump and replace them with new components. Specifically this work will include the following:

  17. Interior and Exterior Low-E Storm Window Installation

    SciTech Connect (OSTI)

    Witters, Sarah

    2014-09-03

    Until recently, energy-efficient window retrofit options have largely been limited to repair or replacement; leaving the homeowner to decide between affordability and deeper energy savings. A new and improved low-e storm window boasts a combination of curb appeal and energy efficiency, all for a fraction of the cost of window replacement. A recent whole-home experiment performed by PNNL suggests that attaching low-e storm windows can result in as much energy savings replacing the windows.

  18. Crude Glycerol as Cost-Effective Fuel for Combined Heat and Power to

    Office of Scientific and Technical Information (OSTI)

    Replace Fossil Fuels, Final Technical Report (Technical Report) | SciTech Connect SciTech Connect Search Results Technical Report: Crude Glycerol as Cost-Effective Fuel for Combined Heat and Power to Replace Fossil Fuels, Final Technical Report Citation Details In-Document Search Title: Crude Glycerol as Cost-Effective Fuel for Combined Heat and Power to Replace Fossil Fuels, Final Technical Report The primary objectives of this work can be summed into two major categories. Firstly, the

  19. WIPP UPDATE: June 17, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 17, 2014 Filter replacement activities progressing as planned Crews are making progress replacing the filters for WIPP's Underground Ventilation System. The system has two filtration units. Each unit has 84 filters in four layers- moderate efficiency filters, high efficiency filters, and two layers of High Efficiency Particulate Air (HEPA) filters After successfully replacing the moderate and high efficiency filters in the first filtration unit, crews restored air flow Monday in preparation

  20. WIPP UPDATE: May 30, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    30, 2014 Tests begin in preparation for filter change out Today, workers began the process to test underground ventilation fans to verify that airflow can be safely reduced during the filter replacement process. New filters are required to replace those that have been capturing material since the February 5 fire and February 14 radiation event. Workers are replacing the filters in phases so that exhaust air leaving the underground facility will continue to be filtered during the activity. This

  1. Critical Materials Institute uses the Materials Genome approach to

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    accelerate rare-earth replacement | Critical Materials Institute Critical Materials Institute uses the Materials Genome approach to accelerate rare-earth replacement CMI research team at a light manufacturing facility Critical Materials Institute uses the Materials Genome approach to accelerate rare-earth replacement The Critical Materials Institute, led by the U.S. Department of Energy's (DOE's) Ames Laboratory, has invented two new phosphors in one year of research, demonstrating the power

  2. Crude Glycerol as Cost-Effective Fuel for Combined Heat and Power to

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Replace Fossil Fuels, Final Technical Report (Technical Report) | SciTech Connect Crude Glycerol as Cost-Effective Fuel for Combined Heat and Power to Replace Fossil Fuels, Final Technical Report Citation Details In-Document Search Title: Crude Glycerol as Cost-Effective Fuel for Combined Heat and Power to Replace Fossil Fuels, Final Technical Report The primary objectives of this work can be summed into two major categories. Firstly, the fundamentals of the combustion of glycerol (in both a

  3. CX-005675: Categorical Exclusion Determination | Department of Energy

    Office of Environmental Management (EM)

    675: Categorical Exclusion Determination CX-005675: Categorical Exclusion Determination Fiscal Year 2011 Kalispell District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 04/15/2011 Location(s): Montana Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the subject transmission line. Replacement will be in-kind

  4. Slide 1

    Energy Savers [EERE]

    Christopher S. Ludwig, P.E. U.S. Army Corps of Engineers Mobile District Mobile District Maintenance Update Southeastern Federal Power Alliance April 2, 2015 BUILDING STRONG ®  Carters Units 3 & 4 Rewind ►Scope * Rewind generator\motors 3 & 4 * Replace generator air coolers * Repair\refurbish draft tube gates * Structural modifications to rotor spider * Replace failed instrumentation * Replace exciter PLC's * Cooling Water Supply System * Procure alignment tooling Major Maintenance

  5. Audit Report: IG-0711 | Department of Energy

    Energy Savers [EERE]

    1 Audit Report: IG-0711 December 5, 2005 Demolition and Replacement of Hanford's Radiological Calibration Laboratory The planned replacement of Hanford's Radiological Calibration for Calibration Laboratory, as currently conceived, will not meet the Services Department of Energy's programmatic needs. Specifically, the replacement facility will not have the capability to serve the mission needs of the EM program at the Hanford site, even though the EM program has, historically, been the largest

  6. New Rules Help Pocahontas Brighten Streets | Department of Energy

    Office of Environmental Management (EM)

    Rules Help Pocahontas Brighten Streets New Rules Help Pocahontas Brighten Streets October 21, 2010 - 10:00am Addthis The City of Pocahontas, Iowa swill replace sodium streetlights with LED fixtures. | File photo The City of Pocahontas, Iowa swill replace sodium streetlights with LED fixtures. | File photo Maya Payne Smart Former Writer for Energy Empowers, EERE What are the key facts? Pocahontas, Iowa was awarded a Recovery Act grant of more than $81,000. The city will replace 266 high-pressure

  7. SECTION J - TABLE OF CONTENTS

    National Nuclear Security Administration (NNSA)

    Conformed to Mod 0108 DE-NA0000622 Section J Page i PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J LIST OF APPENDICES TABLE OF CONTENTS Appendix A Statement of Work (Replaced by Mod 002; Modified Mod 016; Replaced Mod 029) Appendix B Performance Evaluation Plan (Replaced by Mods 002, 016, 020, 029, 0084) Appendix C Contractor's Transition Plan Appendix D Sensitive Foreign Nations Control Appendix E Performance Guarantee Agreement(s) Appendix F National Work Breakdown

  8. Omaha Public Power District- Commercial Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Omaha Public Power District (OPPD) offers incentives for commercial and industrial customers to install energy-efficient heat pumps and replace/retrofit existing lighting systems. The Commercial...

  9. Microsoft Word - Attachment D - Position Qualifications.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D - POSITION QUALIFICATIONS POSITION QUALIFICATIONS NOTE: If accepted, the labor category and minimum position qualifications proposed will be incorporated into (andor replace)...

  10. TITLE AUTHORS SUBJECT SUBJECT RELATED DESCRIPTION PUBLISHER AVAILABILI...

    Office of Scientific and Technical Information (OSTI)

    Crude Glycerol as Cost Effective Fuel for Combined Heat and Power to Replace Fossil Fuels Final Technical Report Roberts William L BIOMASS FUELS biofuels glycerin glycerol...

  11. Small Wind Guidebook/First, How Can I Make My Home More Energy...

    Open Energy Info (EERE)

    by 25% to 50%. Replacing 15 incandescent light bulbs with energy efficient bulbs can save approximately 50 per year. When shopping for appliances, look for the Energy Star...

  12. Instructions to CBECS 1995 Microdata Files

    U.S. Energy Information Administration (EIA) Indexed Site

    5 Files WHAT IS CBECS? Please Note: These microdata files, which contain building characteristics, energy consumption and expenditures, and energy end-use estimates replace the...

  13. CX-009423: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Relay and Switchboard Panel Replacements CX(s) Applied: B4.6 Date: 10/29/2012 Location(s): Arkansas Offices(s): Southwestern Power Administration

  14. Annual Confidential Financial Disclosure Report (OGE 450)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-10-01

    This Notice addresses the Executive Branch confidential financial disclosure requirements. These requirements apply to career GS (GM) employees. (Replaces DOE N 326.7).

  15. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Solving nucleic acid structures by molecular replacement: examples from group II intron ... Accurate design of co-assembling multi-component protein nanomaterials King, Neil P. ; ...

  16. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Filter by Subject cosmic gamma bursts (13) cosmic photons (11) gamma detection (11) design ... meliloti, has been solved using molecular replacement with Escherichia coli ...

  17. CX-012799: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Malin-Hilltop Wood Pole Replacements CX(s) Applied: B1.3Date: 41915 Location(s): CaliforniaOffices(s): Bonneville Power Administration

  18. CX-012805: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Brasada-Harney #1 Wood Pole Replacements CX(s) Applied: B1.3Date: 41908 Location(s): OregonOffices(s): Bonneville Power Administration

  19. CX-012813: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Redmond-Pilot Butte #1 Wood Pole Replacements CX(s) Applied: B1.3Date: 41893 Location(s): OregonOffices(s): Bonneville Power Administration

  20. TVA - Green Power Providers | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    the following qualifying resources: PV, wind, hydropower, and biomass. The long term Green Power Providers program replaces the Generation Partners* pilot program. The energy...

  1. College Station Utilities- Residential Energy Back II Rebate Program

    Broader source: Energy.gov [DOE]

    College Station Utilities offers an incentive for residential customers to install energy efficient HVAC equipment through the Energy Back II Program. Rebates only apply for replacements in...

  2. SLAC Dosimeter / ID Request Form A

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a replacement dosimeter because my dosimeter: Is lost* Was damagedcompromised* Was forgotten Was turned in Expired Other (please explain) * Submit a SLAC LostDamaged Dosimeter...

  3. Notice of Intent to Develop a Page Change to DOE O 551.1D, Official...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    burdensome to travelers and will be removed as a requirement and replaced with a process that requires travelers be responsible for safeguarding their own official...

  4. Microsoft Word - NGL Downlight St Anthony FINAL

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    distribution from the horizontal LED lamp which minimized the loss from the downlight optics. Although the overall light levels increased with the LED system, the LED replacement...

  5. Vehicle Technologies Office: Short-Term Lightweight Materials...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    In the short term, replacing heavy steel components with materials such as high-strength steel, aluminum, or glass fiber-reinforced polymer composites can decrease component weight ...

  6. Solid-State Lighting News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    consumers. The report follows similar reports published in 2011 and 2012. LED replacement lamps are available through many retail outlets, and CALiPER testing offers insights on...

  7. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Rebate Program offers rebates for the removal of old, less efficient lighting products which are replaced with high efficiency technologies. The program is primarily fo......

  8. U.S. DFPARThiENT OF ENERGY EERE PROJECT MANAG E MENTCE~TER

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... programs: - Replacement of traffic signals and street lighting with energy efficient ... B1.31 "installation or relocation of machinery and equipment," B 1.32 "traffic flow ...

  9. Ohio Town Installing ‘Green’ Traffic Signals

    Broader source: Energy.gov [DOE]

    Elyria makes the move to efficient lighting. The town has decided to start replacing traffic lights with energy-efficient LEDs.

  10. National Nuclear Security Administration Babcock & Wilcox Technical

    National Nuclear Security Administration (NNSA)

    ... measures by 39% and fire alarm problem signals by 44% since January 2014. Facility ... the Optical Coordinate Measurement Machine (CMM) replacement project on schedule. ...

  11. DOE Publishes Special CALiPER Report on Retail Lamps | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The report follows similar reports published in 2011 and 2012. LED replacement lamps are available through many retail outlets, and CALiPER testing offers insights on performance ...

  12. Environment/Health/Safety (EHS)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    activities have included the removal or replacement of single walled underground storage tanks with environmentally safe double walled tanks, the renovation of many cooling...

  13. PR 09 12

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    503-230-5840 or 503-230-5131 BPA green lights DC Intertie improvements Replacement of aging equipment would increase capacity and reliability Portland, Ore. - Newly proposed...

  14. Superhydrophobic Transparent Glass Thin Films - Energy Innovation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    surfaces require frequent maintenance andor replacement. And some of the processes use toxic chemicals or produce toxic wastes, leading to disposal problems. DescriptionThe basic...

  15. TRUTeamWorks 06-10-2004

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at WIPP, plus his technical expertise, make him uniquely qualified to move the program forward. Fox replaces Scott Phillips, who recently retired from the company. Steve Offner...

  16. CX-012195: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Alfalfa Substation Control House Replacement CX(s) Applied: B4.11 Date: 05/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  17. 2008 Federal Energy and Water Management Award Winners | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... condensate line replacements, and multiple direct digital control system installations. ... and creating a marketing campaign to develop base-wide support for new energy initiatives. ...

  18. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Madison Gas & Electric- Commercial Energy Efficiency Loan Program Projects must be over 5,000 to qualify and can cover equipment replacements, facility improvements or new...

  19. Jones-Onslow EMC- Residential Heating and Cooling Rebate Program

    Broader source: Energy.gov [DOE]

    Jones-Onslow Electric Membership Corporation offers rebates to residential members who install energy efficient heating and cooling equipment. Members can replace an existing central AC or heat...

  20. CX-011173: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Yaak Substation Transformer Replacement CX(s) Applied: B4.6 Date: 09/18/2013 Location(s): Montana Offices(s): Bonneville Power Administration

  1. Slide 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Major Equipment Repair and Replacement 2013 Southwestern Federal Hydropower Meeting Dallas, TX BUILDING STRONG General Plant Information Rated 45 MW, Operated @ 50 MW ...

  2. Solid-State Lighting: CALiPER Detailed Reports

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    are allowed within round number and category fields. Category: All Cove Downlight Linear LED Lamp Linear Pendant MR16 Lamp MR16 Replacement Lamp Outdoor Area - Post Top...

  3. Hawaii Marine Base Installs Solar Roofs | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Lorelei Laird Writer, Energy Empowers What does this project do? Marine Corps Base Hawaii replaced roofs on two buildings with polyvinyl chloride membrane 'cool' roofs and solar...

  4. CX-012656: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    North Bend Communication Site Engine Generator Replacement CX(s) Applied: B1.3Date: 41848 Location(s): WashingtonOffices(s): Bonneville Power Administration

  5. Search results | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hybrid Vehicles: Cut Pollution & Save Money Alternatives to internal combustion engines have been tried over the years, but none have outlasted or replaced the gasoline- or...

  6. Electric Vehicle Preparedness Task 3: Detailed Assessment of Charging Infrastructure for Plug-in Electric Vehicles at Joint Base Lewis McChord

    SciTech Connect (OSTI)

    Steve Schey; Jim Francfort

    2014-10-01

    This report provides an assessment of charging infrastructure required to support the suggested plug-in electric vehicle replacements at Joint Base Lewis McChord.

  7. U.S. Department of Energy Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Southwestern Power Administration proposes to replace the backup station service and ACDC panel at Doniphan substation. The project will entail laying an underground cable...

  8. Improving Vehicle Fuel Efficiency Through Tire Design, Materials...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Evaluate a light weight barrier film material as a replacement for standard halo-butyl inner liner. * Milestones - Status Conduct 2 nd tire program to further ...

  9. EIS-0350-S1: Extension of the Public Review and Comment Period and Announcement of an Additional Public Hearing

    Broader source: Energy.gov [DOE]

    Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico

  10. Chapter 4: Advancing Clean Electric Power Technologies | Solar...

    Broader source: Energy.gov (indexed) [DOE]

    Solar energy offers a number of strategic benefits to the United States. Replacing fossil-fuel combustion with solar energy reduces emissions of human-induced greenhouse...

  11. Jones-Onslow EMC- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Jones-Onslow Electric Membership Corporation offers rebates to residential members who install energy efficient heating and cooling equipment. Members can replace an existing central AC or heat...

  12. CX-010648: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oklahoma Offices(s): National Energy Technology Laboratory Three fuel flex burners will be retrofitted in Shell's Deer Park Plant and will replace existing conventional...

  13. CX-005958: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evaluate, design and replace as needed: Process cooling water tower and piping, air and nitrogen distribution piping, steam and condensate distribution system, and B-33 steam heat...

  14. Tax Credits, Rebates & Savings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of an energy audit, including: natural gas heating measures, programmable thermostats, boiler reset controls, steam trap replacements and kitchen equipment. The Commercial High...

  15. Bonneville Power Administration: 10 Year Financial Plan, January...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (FCRPS) capital investments exceeding a projected 7 billion for energy resource acquisition, transmission construction and replacements, and fish and wildlife projects. During...

  16. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Johnson County REMC- Commercial Energy Efficiency Rebate Program Johnson County REMC offers rebates to commercial and industrial customers who install or replace new motors,...

  17. North Branch Municipal Water & Light - Commercial & Industrial...

    Broader source: Energy.gov (indexed) [DOE]

    with recycling of working unit Dishwasher: 25 - 40 Clothes Washer: 50 - 100 Clothes Dryer: 25 - 50 Replacement Motors: 15 - 2,700, varies by HP and efficiency Variable...

  18. Search results | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    as replacements for internal combustion engine powered vehicles. In early 2007, an entrepreneur in San Jose, California, announced the introduction of an all-electric sports car....

  19. EECBG Success Story: Energy Savings, Improved Comfort for West...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Martinsburg, West Virginia replaced its HVAC system with a new chiller system fan coil units and enhanced duct work with funding from an Energy Efficiency and...

  20. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    50% of the building occupants to relocate, or involves replacing the HVAC systems. The Green Buildings Program encourages certification beyond Silver (to Gold or Platinum) when...

  1. Vermont Gas- Commercial Energy Efficiency Program

    Broader source: Energy.gov [DOE]

    Vermont Gas (VGS) offers rebates for commercial customers who install high efficiency equipment in existing buildings. The Commercial Equipment Replacement Program is designed for commercial and...

  2. USDA and DOE Award Biomass Research and Development Grants to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Cellana LLC, Kailua Kona, Hawaii, 5,521,173. Cellana will work to develop a protein ... for algal proteins to replace soybean meal, and develop algal protein supplements. ...

  3. Inline_System

    Energy Science and Technology Software Center (OSTI)

    2010-02-01

    Inline_System replaces a small subset of file query and manipulation commands, on computing platforms that do not offer a complete standard POSIX environment.

  4. CX-012002: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Raver-Covington Conductor Replacement CX(s) Applied: B1.3 Date: 04/24/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  5. I-5 Corridor Reinforcement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Damper Replacement Program Wind Projects I-5 Corridor Reinforcement Current project schedule and activities BPA now expects to release our final EIS early in 2016, followed...

  6. SAND2007-5791

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    repair and replacement (maintenance) schedules to offset the effects of aging. * Abnormal Threat: A natural disaster, such as hurricane-force winds or earthquakes,...

  7. CX-008161: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Prosser Hatchery Backup Generator Replacement CX(s) Applied: B1.31 Date: 04/16/2012 Location(s): Washington Offices(s): Bonneville Power Administration

  8. CX-012495: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Building 6 Stack Replacement CX(s) Applied: B1.3Date: 41855 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory

  9. NETL F 451.1/1-1, Categorical Exclusion Designation Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MA; CSA Engineering-Rockville Centre, NY OEOEPMEDTD Brian Mollohan Rockville Centre SCADA, RTU & Relay Project Replacement of relays, Remote Terminal Units (RTUs), and SCADA...

  10. American Indian Tribal Government Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2009-01-16

    The attachment to this Order has been replaced and superseded by the attachment to DOE N 144.1. Canceled by DOE O 144.1.

  11. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    to its business customers for replacing their old equipment with high-efficiency models. Rebates are available for HVAC equipment including heat pumps... Eligibility:...

  12. EIS-0265-SA-100: Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Supplement Analysis EIS-0265-SA-100: Supplement Analysis Oregon Fish Screening Project, Screen Replacements PDF icon Supplement Analysis for the Watershed Management Program...

  13. EIS-0265-SA-91: Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis EIS-0265-SA-91: Supplement Analysis Watershed Management Program - Hood River Fish Habitat (Evans Creek Culvert Replacement) Bonneville Power Administration and the...

  14. Columbia Gas of Virginia - Home Savings Rebate Program | Department...

    Broader source: Energy.gov (indexed) [DOE]

    State Virginia Program Type Rebate Program Rebate Amount High Efficiency Gas Furnace: 300 High Efficiency Windows (Replacement): 1sq. ft. Attic Insulation...

  15. Energy Star Lighting Fixtures: How Does THAT Work?

    Broader source: Energy.gov [DOE]

    If you're considering replacing your indoor or outdoor home lighting, you might want to give an ENERGY STAR fixture a shot.

  16. September 2012 Electrical Safety Occurrences

    Energy Savers [EERE]

    forward, the electricians looked for the missing screw, including sorting through the trash. When the screw was not found, they searched for a replacement screw. No screw could...

  17. Sandia National Laboratories: 2011's Second Zero Waste Lunch...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    during the Student Internship Program's summer welcome event. Replacing the forest of trash cans that usually appear at picnic events, three stations were strategically arranged...

  18. CX-012796: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Big Eddy-Redmond #1 Wood Pole Replacements CX(s) Applied: B1.3Date: 41919 Location(s): OregonOffices(s): Bonneville Power Administration

  19. Tunable Nanocrystalline CZTS for Solar Photovoltaics with No...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to replace the current first generation of solar photovoltaic technology due to their lower manufacturing cost and increased electrical output. Nanocrystal cells, one of the...

  20. TVA - Green Power Providers | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    from the following qualifying resources: PV, wind, hydropower, and biomass. The long term Green Power Providers program replaces the Generation Partners* pilot program. The energy...