Powered by Deep Web Technologies
Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

NV Energy (Northern Nevada Gas)- SureBet Business Energy Efficiency Rebate Program (Nevada)  

Broader source: Energy.gov [DOE]

Commercial, industrial and institutional natural gas customers of NV Energy can take advantage of a wide variety of incentives for retrofit projects. Only customers in Northern Nevada (Reno-Sparks...

2

Sierra Nevada-Basin and Range Transition Near Reno, Nevada: Two...  

Open Energy Info (EERE)

Nevada-Basin and Range Transition Near Reno, Nevada: Two-Stage Development at 12 and 3 Ma Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: Sierra...

3

NV Energy (Southern Nevada)- Solar Hot Water Incentive Program  

Broader source: Energy.gov [DOE]

NV Energy is providing an incentive for its residential customers to install solar water heaters on their homes. As of July 26, 2013, NV Energy electric customers in Southern Nevada who own their...

4

HAER No. NV-32-A Nevada Test Site, Pluto Facility, Disassembly...  

National Nuclear Security Administration (NNSA)

Flat Cane Spring Road Mercury Vicinity Nye County Nevada HAER No. NV-32-A Richard Smith, Photographer January, 1996 (Photographs NV-32-A-1 to NV-32-A-37) and February, 2000...

5

Seismic reflection imaging of the Mount Rose fault zone, Reno, Nevada  

E-Print Network [OSTI]

Seismic reflection imaging of the Mount Rose fault zone, Reno, Nevada Project Award Number: # G09AP expressed or implied, of the U.S. Government. #12;2 Abstract Five new high-resolution seismic reflection00071 Submission date: November 30, 2010 CGISS Technical Report 10-01 Lee M. Liberty Center

Barrash, Warren

6

46th Aerospace Sciences Meeting, January 7-10, 2008, Reno, Nevada A Smart Wind Turbine Blade Using Distributed  

E-Print Network [OSTI]

46th Aerospace Sciences Meeting, January 7-10, 2008, Reno, Nevada A Smart Wind Turbine Blade Using of "smart" wind turbine blades with integrated sensor-actuator-controller modules to im- prove

Nelson, Robert C.

7

Reno, NV, 1976). 38. M. C. Reheis and R. Kihl, J. Geophys. Res. 100,  

E-Print Network [OSTI]

of the Yucca Mountain Unsaturated and Sat- urated Zone Hydrology to Climate Change, 1996 Milestone report 3GCA102M (U.S. Geological Sur- vey­Yucca Mountain Project Branch, Las Vegas, NV, 1997). 42. J. M. Barnola National Laboratory. Part of this work was supported and managed by DOE's Yucca Mountain Site

8

NV Energy (Southern Nevada)- Residential Energy Efficiency Rebate Program  

Broader source: Energy.gov [DOE]

'''Pool Pump and duct system rebates are temporarily suspended. Contact NV Energy for additional information on funding and program availability.'''

9

Environmental assessment for a geothermal direct utilization project in Reno, Nevada  

SciTech Connect (OSTI)

The proposed action involves the development of geothermal wells to provide hot water and heat for five users in Reno, Nevada. Data from nearby wells indicate the sufficient hot water is available from the Moana Known Geothermal Resource Area for this action. Construction activities have been planned to minimize or eliminate problems with noise, runoff, and disturbance of biota as well as other potential environmental effects. Disposal of the geothermal fluids via surface water or injection will be determined based on water quality of the geothermal fluids and geologic effects of injection. The affected environment is described by this document and needed mitigation procedures discussed.

Perino, J.V.; McCloskey, M.H.; Wolterink, T.J.; Wallace, R.C.; Baker, D.W.; Harper, D.L.; Anderson, D.T.; Siteman, J.V.; Sherrill, K.T.

1980-08-20T23:59:59.000Z

10

NV Energy (Northern Nevada)- Solar Hot Water Incentive Program  

Broader source: Energy.gov [DOE]

NV Energy is providing an incentive for its residential customers, small commercial, nonprofit, school and other public customers to install solar water heaters on their homes and facilities. ...

11

University of Nevada, Reno Tree crown mortality associated with roads in the Lake Tahoe Basin: a remote  

E-Print Network [OSTI]

University of Nevada, Reno Tree crown mortality associated with roads in the Lake Tahoe Basin entitled Tree crown mortality associated with roads in the Lake Tahoe Basin: a remote sensing approach, Advisor Robert S. Nowak, Committee Member Wendy Calvin, Graduate School Representative Marsha H. Read, Ph

Weisberg, Peter J.

12

44th Aerospace Sciences Meeting and Exhibit, January 9-12, 2006, Reno, Nevada Turbine Tip Clearance Flow Control  

E-Print Network [OSTI]

clearance between the rotor blade tips and outer casing. For a turbine, this clearance is on the order in an engine. In a turbine stage, blade rotation is caused by work extraction through turning of the post44th Aerospace Sciences Meeting and Exhibit, January 9-12, 2006, Reno, Nevada Turbine Tip Clearance

Morris, Scott C.

13

EA-1849: Ormat Nevada Geothermal Projects in Northern NV | Department...  

Broader source: Energy.gov (indexed) [DOE]

of Land Management's Environmental Assessment T G Power LLC Hot Sulphur Springs Transmission Line, 120 kV Electric Power Line, Northern Independence Valley, Elko County, Nevada...

14

DOE - Office of Legacy Management -- University of Nevada - NV 01  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou areDowntown Site -Miami - FL 0-01 FUSRAPNevada - NV

15

Nevada 2011: Budget Crisis and Political Deadlock  

E-Print Network [OSTI]

University of Nevada, Reno. Beal, M. Kimberly, Lindsayrural Nevada leaned Republican (Beal et al. 1997). Whether

Morin, Robert P.

2012-01-01T23:59:59.000Z

16

Advanced seismic imaging for geothermal development John N. Louie*, Nevada Seismological Laboratory, University of Nevada, Reno; Satish K. Pullammanappallil  

E-Print Network [OSTI]

Advanced seismic imaging for geothermal development John N. Louie*, Nevada Seismological Laboratory In the geothermal fields of the Great Basin physiographic province of western North America, drilling success to be the only effective geophysical means of accurately targeting geothermal drilling. At target depths of 1

17

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration – Project 209 Control Tower and Support Building, Reno, Nevada  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted an energy audit on the Federal Aviation Administration (FAA) control tower and base building in Reno, Nevada. This report presents the findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) and completed a site visit. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for the FAA that would not have otherwise occurred.

Arends, J.; Sandusky, William F.

2010-06-30T23:59:59.000Z

18

Nevada 2012: Budget Stability and Hope for Improvement  

E-Print Network [OSTI]

University of Nevada, Reno. Beal, M. Kimberly, Lindsayrural Nevada leaned Republican (Beal et al. 1997). Whether

Morin, Robert P.

2013-01-01T23:59:59.000Z

19

NV Energy (Southern Nevada)- SureBet Business Energy Efficiency Rebate Program  

Broader source: Energy.gov [DOE]

'''Funding is not currently available for the Nevada Surebet Southern Retrofit Program. New Construction projects are still eligible for funding as of October, 2012.'''

20

NV Energy (Northern Nevada)- SureBet Business Energy Efficiency Rebate Program  

Broader source: Energy.gov [DOE]

'''Funding is not currently available for the Nevada Surebet Northern Retrofit Program. New Construction projects are still eligible for funding as of October, 2012.'''

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

DOE - Office of Legacy Management -- Central Nevada Test Site - NV 02  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou are here Home »Hill -Elmore -CarpenterNevadaCentral

22

Nevada 2011: Budget Crisis and Political Deadlock  

E-Print Network [OSTI]

Guy (2011a) “Ruling Bites Budget Plans,” Reno Gazette-1A & 7A. Nevada 2011: Budget Crisis and Political DeadlockBureau (2010) Revenue and Budget. Carson City, Nevada:

Morin, Robert P.

2012-01-01T23:59:59.000Z

23

EA-1784: Fotowatio Nevada Solar, LLC's Apex Solar Power Project...  

Broader source: Energy.gov (indexed) [DOE]

84: Fotowatio Nevada Solar, LLC's Apex Solar Power Project in Clark County, NV EA-1784: Fotowatio Nevada Solar, LLC's Apex Solar Power Project in Clark County, NV July 1, 2010...

24

Nevada 2012: Budget Stability and Hope for Improvement  

E-Print Network [OSTI]

Guy (2011) “Ruling Bites Budget Plans,” Reno Gazette-University of Utah. Budget Stability and Hope forBureau (2010) Revenue and Budget. Carson City, Nevada:

Morin, Robert P.

2013-01-01T23:59:59.000Z

25

Statistical Properties of the Cluster Dynamics of the Systems of ...  

E-Print Network [OSTI]

Landau Institute of Theoretical Physics, Moscow, Russia. §. Department of Mathematics and Statistics, University of Nevada, Reno, NV 89557,. USA ...

1910-70-12T23:59:59.000Z

26

Reno, Nevada: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar PowerstoriesNrelPartnerType Jump to:Co Agency/CompanyReferenceFuels

27

Reno, Nevada: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, searchVirginia Blue Ridge AndREII Jump to:RFSL JumpSpirits

28

Center for volcanic and tectonic studies, Department of Geoscience, Univ. of Nevada, Las Vegas, NV. Annual report No. 69, October 1, 1991--September 30, 1992  

SciTech Connect (OSTI)

The annual report of the Center for Volcanic and Tectonic Studies (CVTS) contains a series of papers, maps, and reprints that review the progress made by the CVTS between October 1, 1991 and December 31, 1992. During this period CVTS staff focused on several topics that had direct relevance to volcanic hazards related to the proposed high-level nuclear waste repository at Yucca Mountain, Nevada. These topics included: (1) The role of the mantle during regional extension. (2) The structural controls and emplacement mechanisms of Pliocene/Quaternary basaltic centers and dikes. (3) The detailed geochemistry of individual volcanic centers in Crater Flat, Nevada. (4) Estimating the probability of disruption of the proposed repository by volcanic eruption (this topic is being studied by Dr. C-H. Ho at UNLV).

Smith, E.I.

1992-12-15T23:59:59.000Z

29

Nevada National Security Site Environmental Report 2013 Summary  

SciTech Connect (OSTI)

The information presented in this document is explained in greater detail in the Nevada National Security Site Environmental Report 2013 (DOE/NV/25946--2182).

Wills, C.

2014-09-09T23:59:59.000Z

30

A Helium Isotope Perspective On The Dixie Valley, Nevada, Hydrothermal...  

Open Energy Info (EERE)

A Helium Isotope Perspective On The Dixie Valley, Nevada, Hydrothermal System Abstract Fluids from springs, fumaroles, and wells throughout Dixie Valley, NV were analyzed for noble...

31

amargosa valley nevada: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9 October 2007 Engineering Websites Summary: University of Nevada Las Vegas, Las Vegas, NV, USA c Department of Agronomy and Horticulture New Mexico State. ULERY Department of...

32

DOE/NV/26383-LTR2008-01 Letter Report Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Caliente, Lincoln County, Nevada  

SciTech Connect (OSTI)

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Beatty, Sarcobatus Flats, Rachel, Caliente, Pahranagat NWR, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

J. Engelbrecht; I. Kavouras; D. Campbell; S. Campbell; S. Kohl; D. Shafer

2009-04-02T23:59:59.000Z

33

New results from RENO and prospects with RENO-50  

E-Print Network [OSTI]

RENO (Reactor Experiment for Neutrino Oscillation) has made a definitive measurement of the smallest mixing angle theta13 in 2012, based on the disappearance of electron antineutrinos. More precise measurements have been obtained and presented on the mixing angle and the reactor neutrino spectrum, using ~800 days of data. We have observed an excess of IBD prompt spectrum near 5 MeV with respect to the most commonly used models. The excess is found to be consistent with coming from reactors. We have also successfully measured the reactor neutrino flux with a delayed signal of neutron capture on hydrogen. A future reactor neutrino experiment of RENO-50 is proposed to determine the neutrino mass hierarchy and to make highly precise measurements of theta12, delta(m_21)^2, and delta(m_31)^2. Physics goals and sensitivities of RENO-50 are presented with a strategy of obtaining an extremely good energy resolution toward the neutrino mass hierarchy.

Soo-Bong Kim

2014-12-10T23:59:59.000Z

34

RECIPIENT:Desert Research Institute STATE:NV PROJECT Tall Tower...  

Broader source: Energy.gov (indexed) [DOE]

of4 RECIPIENT:Desert Research Institute STATE:NV PROJECT Tall Tower Wind Energy Monitoring and Numerical Model Validation in Southern Nevada; NREl Tracking TITLE: No. 11-012...

35

Nevada`s role in the hydrogen economy  

SciTech Connect (OSTI)

The paper discusses the promise of hydrogen and its possible applications, barriers to its development, the role that the Nevada Test Site could play if it were made more available to public and private institutions for research, and the ``clean city`` concept being developed jointly with California, Utah, and Nevada. This concept would create a ``clean corridor`` along the route from Salt Lake City through Reno to Sacramento, Los Angeles, Las Vegas, and back to Salt Lake City.

Vaeth, T. [Dept. of Energy, Las Vegas, NV (United States)

1997-12-31T23:59:59.000Z

36

United States Department of Energy Nevada Operations Office Environmental Compliance Handbook. Third edition  

SciTech Connect (OSTI)

The Environment, Safety & Health Division (ESHD) of the Nevada Operations Office has prepared this Environmental Compliance Handbook for all users of the Nevada Test Site (NTS) and other US Department of Energy, Nevada Operations Office (DOE/NV) facilities. The Handbook gives an overview of the important environmental laws and regulations that apply to the activities conducted by the Nevada Operations Office and other users of DOE/NV facilities in Nevada.

NONE

1998-03-01T23:59:59.000Z

37

NV Energy Electricity Storage Valuation  

SciTech Connect (OSTI)

This study examines how grid-level electricity storage may benet the operations of NV Energy in 2020, and assesses whether those benets justify the cost of the storage system. In order to determine how grid-level storage might impact NV Energy, an hourly production cost model of the Nevada Balancing Authority (\\BA") as projected for 2020 was built and used for the study. Storage facilities were found to add value primarily by providing reserve. Value provided by the provision of time-of-day shifting was found to be limited. If regulating reserve from storage is valued the same as that from slower ramp rate resources, then it appears that a reciprocating engine generator could provide additional capacity at a lower cost than a pumped storage hydro plant or large storage capacity battery system. In addition, a 25-MW battery storage facility would need to cost $650/kW or less in order to produce a positive Net Present Value (NPV). However, if regulating reserve provided by storage is considered to be more useful to the grid than that from slower ramp rate resources, then a grid-level storage facility may have a positive NPV even at today's storage system capital costs. The value of having storage provide services beyond reserve and time-of-day shifting was not assessed in this study, and was therefore not included in storage cost-benefit calculations.

Ellison, James F.; Bhatnagar, Dhruv; Samaan, Nader A.; Jin, Chunlian

2013-06-30T23:59:59.000Z

38

Record of Technical Change for Corrective Action Plan for Corrective Action Unit 140: Waste Dumps, burn Pits, and Storage Area, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Record of Technical Change for Corrective Action Plan for Corrective Action Unit 140: Waste Dumps, Burn Pits, and Storage Area, Nevada Test Site, Nevada (DOE/NV--963-Rev 2, dated November 2004).

U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office; Bechtel Nevada

2005-01-05T23:59:59.000Z

39

DOE/NV?325?Rev  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Security Administration Nevada Site Office NRC U.S. Nuclear Regulatory Commission NSTec National Security Technologies, LLC NTS Nevada Test Site NTSWAC Nevada Test Site Waste...

40

This article appeared in a journal published by Elsevier. The attached copy is furnished to the author for internal non-commercial research  

E-Print Network [OSTI]

, maintenance of line-of-sight between two FSO transceivers during a transmission is a challenge since FSO University of Nevada, Reno, CSE Department, MS 171, 1664 N. Virginia Street, Reno, NV 89557, USA a r t i c l

Yuksel, Murat

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Nevada Renewable Energy Projects June 10, 2009  

E-Print Network [OSTI]

Nevada Renewable Energy Projects June 10, 2009 WASHOE ELKO HUMBOLDT EUREKA LANDER PERSHING Winnemucca Reno Carson City Tonopah Ely Las Vegas Pahrump Project Type and Dispostion Solar Energy ROW, Pending Wind Testing ROW, Authorized Wind Energy ROW, Pending Geothermal Energy Leases, Authorized

Laughlin, Robert B.

42

Nuclear Energy Policy University of Nevada ? Reno 27 March...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Review EPR Program Review Unannounced Applicant Hearing ABWR Program Review Duke - Cherokee (SC) Hearing Progress Energy - Harris (NC) Hearing NuStart - Bellefonte (AL) Hearing...

43

Nuclear Energy Policy University of Nevada ? Reno 27 March...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

* Safe, effective disposition of spent nuclear fuel not yet demonstrated What's driving nuclear expansion * Rapid increase in global energy demand * Rising importance of carbon...

44

Nuclear Energy Policy University of Nevada ? Reno 27 March...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 1 Iran 0 1 Current unit expansion in AsiaEurope 2 8 1 6 0 Drivers for additional U.S. nuclear capacity * Safe * Proven performance * Cost effective * Sustainable * Energy...

45

Preliminary Site Assessment Of The Redfield Campus, Reno, Nevada, Usa |  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoadingPenobscot County, Maine:Plug Power IncPowder RiverPratt, Kansas:PrebleTableArea,

46

National Geothermal Academy Underway at University of Nevada, Reno |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F S i DOETowardExecutive Summary In the EnergyDepartment of

47

Nevada Test Site environmental data report for calendar year 1996  

SciTech Connect (OSTI)

US Department of Energy (DOE) Order 5400.1, ``General Environmental Protection Program,`` establishes environmental protection program requirements, authorities, and responsibilities for DOE operations. These mandates require compliance with applicable federal, state, and local environmental protection regulations. During calendar year (CY) 1996, environmental protection and monitoring programs were conducted at the Nevada Test Site and other DOE Nevada Operations Office (DOE/NV)-managed sites in Nevada and across the US. A detailed discussion of these environmental protection and monitoring programs and summary data and assessments for environmental monitoring results are provided in the DOE/NV Annual Site Environmental Report-1996 (ASER), DOE/NV/11718-137. This document provides summary data results and detailed assessments for the environmental monitoring conducted for all DOE/NV-managed sites in CY1996.

Black, S.C.; Townsend, Y.E. [eds.; Kinnison, R.R.

1998-03-01T23:59:59.000Z

48

DOE - Office of Legacy Management -- U S Bureau of Mines Reno Station - NV  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou areDowntown Site - MOTracerlab Inc -TwinUT 01

49

GRR workshop at GRC scheduled for 10/2 in Reno, NV | OpenEI Community  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision has beenFfe2fb55-352f-473b-a2dd-50ae8b27f0a6TheoreticalFuelCell Energy IncFOR EGS Home >Meeting

50

Nevada Test Site Radiological Control Manual  

SciTech Connect (OSTI)

This document supersedes DOE/NV/25946--801, “Nevada Test Site Radiological Control Manual,” Revision 0 issued in October 2009. Brief Description of Revision: A minor revision to correct oversights made during revision to incorporate the 10 CFR 835 Update; and for use as a reference document for Tenant Organization Radiological Protection Programs.

Radiological Control Managers' Council Nevada Test Site

2010-02-09T23:59:59.000Z

51

EIS-0215: Pinon Pine Power Project, Tracy Station, NV  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE) prepared this statement to assess the environmental and human health issues associated with the Pinon Pine Power Project, a proposed demonstration project that would be cost-shared by DOE and the Sierra Pacific Power Company (SPPCo.) under DOE's Clean Coal Technology Program. The proposed Federal action is for DOE to provide cost-shared funding support for the construction and operation of the Pinon Pine Power Project, a coal-fired power generating facility, which would be a nominal, 800-ton-per-day (104 megawatt (MW) gross generation) air-blown, Integrated Gasification Combined-Cycle plant proposed by SPPCo. at its Tracy Power Station near Reno, Nevada.

52

Nevada Test Site Resource Management Plan: Annual summary, January 2000  

SciTech Connect (OSTI)

The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

NONE

2000-01-01T23:59:59.000Z

53

NV Energy- Energy Plus New Homes Program  

Broader source: Energy.gov [DOE]

NV Energy offers the Energy Plus New Homes Program provides rebates to certified builders in the NV Energy service territory that build high-efficiency homes. (Rebates are only available to home...

54

U.S. Department of Energy, Nevada Operations Office, environmental data report for the Nevada Test Site -- 1995  

SciTech Connect (OSTI)

The US Department of Energy (DOE) Order 5400.1, ``General Environmental Protection Program,`` establishes environmental protection program requirements, authorities, and responsibilities for DOE operations. These mandates require compliance with applicable federal, state, and local environmental protection regulations. During calendar year (CY) 1995 environmental protection and monitoring programs were conducted at the Nevada Test Site (NTS) and other DOE Nevada Operations Office (DOE/NV) managed sites in Nevada and across the United States. A detailed discussion of these environmental protection and monitoring programs, and summary data and assessments for environmental monitoring results at these sites in CY 1995 are provided in the DOE/NV, Annual Site Environmental Report--1995, (ASER) DOE/NV/11718-037. A brief description of the scope of this environmental monitoring is provided below, categorized by ``on-NTS`` and ``off-NTS`` monitoring.

Black, S.C.; Townsend, Y.E. [eds.; Kinnison, R.R.

1997-10-01T23:59:59.000Z

55

Reno Roundtable Summary | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015 |RebeccaRegionalReliabilityRenewable EnergyRenie BoyleReno

56

NV/YMP radiological control manual, Revision 2  

SciTech Connect (OSTI)

The Nevada Test Site (NTS) and the adjacent Yucca Mountain Project (YMP) are located in Nye County, Nevada. The NTS has been the primary location for testing nuclear explosives in the continental US since 1951. Current activities include operating low-level radioactive and mixed waste disposal facilities for US defense-generated waste, assembly/disassembly of special experiments, surface cleanup and site characterization of contaminated land areas, and non-nuclear test operations such as controlled spills of hazardous materials at the hazardous Materials (HAZMAT) Spill Center (HSC). Currently, the major potential for occupational radiation exposure is associated with the burial of low-level nuclear waste and the handling of radioactive sources. Planned future remediation of contaminated land areas may also result in radiological exposures. The NV/YMP Radiological Control Manual, Revision 2, represents DOE-accepted guidelines and best practices for implementing Nevada Test Site and Yucca Mountain Project Radiation Protection Programs in accordance with the requirements of Title 10 Code of Federal Regulations Part 835, Occupational Radiation Protection. These programs provide protection for approximately 3,000 employees and visitors annually and include coverage for the on-site activities for both personnel and the environment. The personnel protection effort includes a DOE Laboratory Accreditation Program accredited dosimetry and personnel bioassay programs including in-vivo counting, routine workplace air sampling, personnel monitoring, and programmatic and job-specific As Low as Reasonably Achievable considerations.

Gile, A.L. [comp.] [comp.

1996-11-01T23:59:59.000Z

57

Sierra Nevada-Basin and Range Transition Near Reno, Nevada: Two-Stage  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g Grant ofRichardton AbbeyARaftPadomaSierra Leone) Jump to:Sierra

58

U.S. DEPARTl\\1EN T OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Broader source: Energy.gov (indexed) [DOE]

CENTER NEPA DETERlIiJTNATION Page 1 of 3 RECIPIENT:Board of Regents , NSHE, obo University of Nevada, Reno STATE: NV PROJECT TITLE : Development of a Low Cost Method to...

59

Nevada National Security Site Environmental Report 2013  

SciTech Connect (OSTI)

This report was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. It was prepared by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) (formerly designated as the Nevada Site Office [NNSA/NSO]). The new field office designation occurred in March 2013. Published reports cited in this 2013 report, therefore, may bear the name or authorship of NNSA/NSO. This and previous years’ reports, called Annual Site Environmental Reports (ASERs), Nevada Test Site Environmental Reports (NTSERs), and, beginning in 2010, Nevada National Security Site Environmental Reports (NNSSERs), are posted on the NNSA/NFO website at http://www.nv.energy.gov/library/publications/aser.aspx.

Wills, C.

2014-09-09T23:59:59.000Z

60

http://nevada.usgs.gov/doe_nv/ntsmap.htm  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Reviewwill help prepareA Review PARTUnnamed faultsRecord

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

NV Energy (Northern Nevada)- Residential Energy Efficiency Rebate Program  

Broader source: Energy.gov [DOE]

'''As of November 30, 2011, furnace and boiler rebates have been suspended until further notice. View the program web site for additional details and contact information.'''

62

Nevada Test Site Environmental Report 2008  

SciTech Connect (OSTI)

The Nevada Test Site Environmental Report (NTSER) 2008 was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. It was prepared by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This and previous years’ NTSERs are posted on the NNSA/NSO website at http://www.nv.doe.gov/library/publications/aser.aspx.

Cathy A. Wills

2009-09-01T23:59:59.000Z

63

Nevada Test Site Environmental Report 2008 Summary  

SciTech Connect (OSTI)

The Nevada Test Site Environmental Report (NTSER) 2008 was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. It was prepared by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This and previous years’ NTSERs are posted on the NNSA/NSO website at http://www.nv.doe.gov/library/publications/aser.aspx.

Cathy A. Wills

2009-09-01T23:59:59.000Z

64

Figure 2 Known and speculative Eocene-Oligocene paleovalleys of northern California and western Nevada. Lower portions of channels from Lindgren (1911) and Lawler (1995). Some central Nevada calderas shown.  

E-Print Network [OSTI]

Dayton Kings Beach Reno Sparks Sun Valley Yerington Dutch Hill Mine Bean Hill Spanish Peak TaylorsLake FIGURE 8 FIGURE 7 FIGURE 6 Taylorsville N 0 10 20 0 10 20 miles 30 kilometers CALIFORNIA NEVADA LassenCounty SierraCounty Plumas County Figure 4 Map of known and speculative Eocene-Oligocene paleovalleys

Tingley, Joseph V.

65

R. A. Wirtz e-mail: rawirtz@unr.edu  

E-Print Network [OSTI]

of Nevada, Reno, Reno, NV 89557 A Hybrid Thermal Energy Storage Device, Part 1: Design Methodology A thermal response model for designing a hybrid thermal energy storage (TES) heat sink is developed coolers must be designed for peak power operation. Incorporation of a Thermal Energy Storage TES mechanism

Wirtz, Richard A.

66

Recommendations for Development of Resilience-Based State-and-Transition Models D. D. Briske,1  

E-Print Network [OSTI]

Forum Recommendations for Development of Resilience-Based State-and-Transition Models D. D. Briske of Ecosystem Science and Management, Texas A&M University, 2138 TAMU, College Station, TX 77843, USA; 2, University of Nevada­Reno, Reno, NV 89557, USA; and 4 Rangeland Management Specialist, USDA-NRCS, West

67

Throughput Characteristics of Free-Space-Optical Mobile Ad Hoc Networks  

E-Print Network [OSTI]

Yuksel Department of Computer Science and Engineering University of Nevada, Reno MS 171 Reno, NV, USA it has the advan- tage of high-speed modulation, maintenance of line-of-sight be- tween two FSO transceivers during a transmission is a crucial prob- lem since FSO transmitters are highly directional

Yuksel, Murat

68

Multi-transceiver simulation modules for free-space optical mobile ad hoc networks  

E-Print Network [OSTI]

and Murat Yuksel University of Nevada - Reno, CSE Department, MS 171 1664 N. Virginia Street, Reno, NV 89557 advantage of propagating in all directions enabling a receiver to roam inside the transmission sphere significant difference between FSO and RF is the requirement of line- of-sight in FSO, adding space

Yuksel, Murat

69

Packet-Based Simulation for Optical Wireless Communication  

E-Print Network [OSTI]

of Nevada - Reno eSE Department, MS 171 1664 N. Virginia Street, Reno, NV 89557, USA. Phone: +1 (775) 327 is on accurately simulating line-of-sight (LOS) requirement for two communicating antennas, the drop to roam inside the transmission sphere without experiencing a link disruption, although, it may encounter

Yuksel, Murat

70

Using directionality in mobile routing Bow-Nan Cheng Murat Yuksel Shivkumar Kalyanaraman  

E-Print Network [OSTI]

, USA e-mail: bownan@gmail.com M. Yuksel Reno ECSE Department, University of Nevada, Reno, NV, USA S compared to RF but suffers from: (1) the need for line of sight (LOS) alignment and (2) reduced transmission quality in adverse weather conditions. Yuksel et al. [4] proposed several ways to mitigate

Yuksel, Murat

71

46th AIAA Aerospace Sciences Meeting and Exhibit, January 710, 2008/Reno, NV Upstream and downstream influence on the  

E-Print Network [OSTI]

and downstream influence on the unsteadiness of STBLI using DNS data in two configurations M. Pino Martin , S 08544 Statistical analysis of the upstream and downstream flow influence on shock unsteadiness in shock that the unsteadiness of the shock is dominated by the downstream flow. The same analysis applied to the reflected shock

Martín, Pino

72

AIAA Aerospace Sciences Meeting and Exhibit, 7-10 January 2008, Reno, NV Comparative Study of 3D Wing Drag  

E-Print Network [OSTI]

Roman§ The Boeing Company, USA Neal Harrison¶ The Boeing Company, USA John Vassberg The Boeing Company optimization tools were used: SYN107 (Intel- ligent Aerodynamics Int'l), MDOPT (The Boeing Company) and OPTIMAS (Israel Aerospace Industries). The first tool employs gradient-based search techniques using

Jameson, Antony

73

Session F3G 0-7803-6669-7/01/$10.00 - -2001 IEEE October 10 -13, 2001 Reno, NV  

E-Print Network [OSTI]

for operation in the presence of uncontrollable factors (formal technical robust design) and for stringent low-cost results from the first sequential offering of the courses, and a directed path toward improvement and robustness of the design in the presence of uncontrolla- ble factors in the fabrication process

74

Session S2B 0-7803-6669-7/01/$10.00 2001 IEEE October 10 -13, 2001 Reno, NV  

E-Print Network [OSTI]

of engineering, mathematics, and the sciences [8] - [15]. The use of writing in introductory physics classes topic in physics. Science classes, in particular, may be viewed by many students as being threatening the study. The underlying questions involved the assessment of student learning in physics as well

Larkin, Teresa L.

75

43rd AIAA Aerospace Sciences Meeting and Exhibit, Jan 10-13, 2005/Reno, NV Nonpremixed Combustion in an Accelerating  

E-Print Network [OSTI]

a turbine passage is modelled by a mixing layer of fuel and oxidizer streams going through a channel burning fuel in the turbine stages. For ground-based gas turbines, benefits have been shown to occur in the present study, we model the flow through the turbine passage by a mixing layer of fuel and oxidizer

Liu, Feng

76

NV Energy- Energy Smart Schools Program  

Broader source: Energy.gov [DOE]

The Energy Smart Schools program helps Nevada school districts reduce energy consumption, improve learning environments, and save money by implementing energy efficiency improvements in new and...

77

Nevada Test Site, site treatment plan 1999 annual update  

SciTech Connect (OSTI)

A Site Treatment Plan (STP) is required for facilities at which the US Department of Energy Nevada Operations Office (DOE/NV) generates or stores mixed waste (MW), defined by the Federal Facility Compliance Act (FFC Act) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act (RCRA) and a radioactive material subject to the Atomic Energy Act. This STP was written to identify specific treatment facilities for treating DOE/NV generated MW and provides proposed implementation schedules. This STP was approved by the Nevada Division of Environmental Protection (NDEP) and provided the basis for the negotiation and issuance of the FFC Act Consent Order (CO) dated March 6, 1996, and revised June 15, 1998. The FFC Act CO sets forth stringent regulatory requirements to comply with the implementation of the STP.

NONE

1999-03-01T23:59:59.000Z

78

Ultrasensitive Magnetometry and Imaging with NV Diamond  

E-Print Network [OSTI]

-size wire structure to sit directly on the surface of millimeter-scale diamond plate. In contrast to conventional magnetic resonance imaging pulsed ESR was used to measure the Rabi oscillations. From the beating of Rabi oscillations from a "double NV...

Kim, Changdong

2011-08-08T23:59:59.000Z

79

JANET RUTH WHITE University of Nevada -Las Vegas School of Architecture  

E-Print Network [OSTI]

JANET RUTH WHITE University of Nevada - Las Vegas School of Architecture Las Vegas, NV 89154-4018 janet.white@unlv.edu (702) 895 - 4431 EDUCATION Cornell University School of Architecture, Art and Planning Ph.D., May 2001, History of Architecture and Urbanism Dissertation title: "The Intersection

Ahmad, Sajjad

80

Addendum to the Closure Report for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada  

SciTech Connect (OSTI)

This addendum to the Closure Report for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada, DOE/NV--1480, dated July 2012, documents repairs of erosion and construction of engineered erosion protection features at Corrective Action Site (CAS) 02-37-02 (MULLET) and CAS 09-99-06 (PLAYER). The final as-built drawings are included in Appendix A, and photographs of field work are included in Appendix B. Field work was completed on March 11, 2013.

none,

2013-07-31T23:59:59.000Z

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

EnergyFit Nevada (Nevada)  

Broader source: Energy.gov [DOE]

EnergyFit Nevada is a home energy retrofit program. The program assists homeowners in finding and contacting an energy assessment professional to perform an energy assessment and a certified...

82

GIS for Nevada railroads: 1993 report  

SciTech Connect (OSTI)

This is an interim report on a task within a large, ongoing study by the University of Nevada, Reno to examine the safety of Nevada railroads. The overall goal, of which this year`s research is a middle stage, is to develop models based on the use of geographic information systems (GIS). These models are to enable the selection of the best and safest railway routes for the transport of high-level nuclear waste across Nevada to the proposed repository at Yucca Mountain. Last year`s research concluded that the databases are adequate and that GIS are feasible and desirable for displaying the multi-layered data required to reach decisions about safety. It developed several database layers. This report deals with work during 1993 on the use of geographic information systems (GIS) for rail-route selection. The goal was to identify and assemble many of the databases necessary for the models. In particular, the research aimed to identify (a) any problems with developing database layers; and (b) the level of effort required. This year`s effort developed database layers for two Nevada counties: Clark and Lincoln. The layers dealt with: topographic information, geologic information, and land ownership. These are among the most important database layers. The database layers were successfully created. No significant problems arose in developing them. The level of effort did not exceed the expected level. The most effective approach is by means of digital, shaded relief maps. (Sample maps appear in plates.) Therefore, future database development will be straightforward. Research may proceed on the full development of shaded relief elevation maps for Elko, White Pine, Nye and Eureka counties and with actual modeling for the selection of a route or routes between the UP/SP line in northern Nevada and Yucca Mountain.

Carr, J.R.

1993-12-01T23:59:59.000Z

83

EIS-0354: Ivanpah Energy Center, NV  

Broader source: Energy.gov [DOE]

Ivanpah Energy Center, L.P., a Diamond Generating Corporation Company, a subsidiary of Mitsubishi Corporation proposes to construct and operate a 500 Megawatt (MW) gas-fired electric power generating station in southern Clark County, Nevada.

84

Energy Consumption of TCP Reno, Newreno, and SACK in Multi-Hop Wireless Networks  

E-Print Network [OSTI]

Energy Consumption of TCP Reno, Newreno, and SACK in Multi-Hop Wireless Networks Harkirat Singh In this paper we compare the energy consumption behavior of three versions of TCP ­ Reno, Newreno, and SACK the lowest overall energy consumption. 1. INTRODUCTION Today, sophisticated wireless devices are gaining

Singh, Suresh

85

Reno County, Kansas: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, searchVirginia Blue Ridge AndREII Jump to:RFSL JumpSpirits LLCStandardsReno

86

STAT 152: Introduction to Statistics -Fall 2013 Department of Mathematics and Statistics, University of Nevada Reno  

E-Print Network [OSTI]

STAT 152: Introduction to Statistics - Fall 2013 Department of Mathematics and Statistics TA or the instructor during our office hours. Course Description and Prerequisites: STAT 152://www.knowledgecenter.unr.edu/dataworks/citrixinfo.html with your Net ID. The knowledge of MINITAB will help you with your statistical projects long after we

Kozubowski, Tomasz J.

87

STAT 152: Introduction to Statistics -Fall 2012 Department of Mathematics and Statistics, University of Nevada Reno  

E-Print Network [OSTI]

STAT 152: Introduction to Statistics - Fall 2012 Department of Mathematics and Statistics TA or the instructor during our office hours. Course Description and Prerequisites: STAT 152://www.knowledgecenter.unr.edu/dataworks/citrixinfo.html with your Net ID. The knowledge of MINITAB will help you with your statistical projects long after we

Kozubowski, Tomasz J.

88

Microsoft Word - DOE-ID-14-010 Nevada Reno B1-31.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recovery challenge fundProject8 - Outline andPROPOSAL6 SECTION4079162

89

Microsoft Word - DOE-ID-14-079 Nevada Reno EC B3-6.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recovery challenge fundProject8 - Outline andPROPOSAL68 SECTION A.59179 SECTION

90

ASPRS 2006 Annual Conference Reno, Nevada May 1-5, 2006  

E-Print Network [OSTI]

of primary interest include Phragmites australis, Typha spp. and Spartina patens. These three plant species to mid twentieth century, Phragmites australis, or common reed, rapidly began to expand its range within. australis = 3.01m; Typha spp. = 1.37m; S. patens = 0.64m. The data also are being examined to learn how

Royer, Dana

91

NV/YMP RADIOLOGICAL CONTROL MANUAL  

SciTech Connect (OSTI)

This manual contains the radiological control requirements to be used for all radiological activities conducted by programs under the purview of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) and the Yucca Mountain Office of Repository Development (YMORD). Compliance with these requirements will ensure compliance with Title 10 Code of Federal Regulations Part 835 (10 CFR 835), Occupational Radiation Protection. Programs covered by this manual are located at the Nevada Test Site (NTS); Nellis Air Force Base and North Las Vegas, Nevada; Santa Barbara and Pleasanton, California; and at Andrews Air Force Base, Maryland. In addition, field work by NNSA/NSO at other locations is also covered by this manual.

U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION NEVADA SITE OFFICE; BECHTEL NEVADA

2004-11-01T23:59:59.000Z

92

Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada  

SciTech Connect (OSTI)

This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

K. Campbell

2000-04-01T23:59:59.000Z

93

NV Energy RFP | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |EnergyonSupport0.pdf5 OPAM SEMIANNUALNASCAR Green Gets First PlaceServicesNTS_History.inddNV

94

ASM International NV | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 SouthWater Rights,InformationWind EnergyPublic UtilitiesTechnologyNV

95

NV energy electricity storage valuation : a study for the DOE Energy Storage Systems program.  

SciTech Connect (OSTI)

This study examines how grid-level electricity storage may benefit the operations of NV Energy, and assesses whether those benefits are likely to justify the cost of the storage system. To determine the impact of grid-level storage, an hourly production cost model of the Nevada Balancing Authority (%22BA%22) as projected for 2020 was created. Storage was found to add value primarily through the provision of regulating reserve. Certain storage resources were found likely to be cost-effective even without considering their capacity value, as long as their effectiveness in providing regulating reserve was taken into account. Giving fast resources credit for their ability to provide regulating reserve is reasonable, given the adoption of FERC Order 755 (%22Pay-for-performance%22). Using a traditional five-minute test to determine how much a resource can contribute to regulating reserve does not adequately value fast-ramping resources, as the regulating reserve these resources can provide is constrained by their installed capacity. While an approximation was made to consider the additional value provided by a fast-ramping resource, a more precise valuation requires an alternate regulating reserve methodology. Developing and modeling a new regulating reserve methodology for NV Energy was beyond the scope of this study, as was assessing the incremental value of distributed storage.

Ellison, James F.; Bhatnagar, Dhruv; Samaan, Nader [Pacific Northwest National Laboratory, Richland, WA; Jin, Chunlian [Pacific Northwest National Laboratory, Richland, WA

2013-06-01T23:59:59.000Z

96

Nevada National Security Site Environmental Report 2011  

SciTech Connect (OSTI)

This report was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. It was prepared by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This and previous years reports, called Annual Site Environmental Reports (ASERs), Nevada Test Site Environmental Reports (NTSERs), and, beginning in 2010, Nevada National Security Site Environmental Reports (NNSSERs), are posted on the NNSA/NSO website at http://www.nv.energy.gov/library/publications/aser.aspx. This NNSSER was prepared to satisfy DOE Order DOE O 231.1B, 'Environment, Safety and Health Reporting.' Its purpose is to (1) report compliance status with environmental standards and requirements, (2) present results of environmental monitoring of radiological and nonradiological effluents, (3) report estimated radiological doses to the public from releases of radioactive material, (4) summarize environmental incidents of noncompliance and actions taken in response to them, (5) describe the NNSA/NSO Environmental Management System and characterize its performance, and (6) highlight significant environmental programs and efforts. This NNSSER summarizes data and compliance status for calendar year 2011 at the Nevada National Security Site (NNSS) (formerly the Nevada Test Site) and its two support facilities, the North Las Vegas Facility (NLVF) and the Remote Sensing Laboratory-Nellis (RSL-Nellis). It also addresses environmental restoration (ER) projects conducted at the Tonopah Test Range (TTR). Through a Memorandum of Agreement, NNSA/NSO is responsible for the oversight of TTR ER projects, and the Sandia Site Office of NNSA (NNSA/SSO) has oversight of all other TTR activities. NNSA/SSO produces the TTR annual environmental report available at http://www.sandia.gov/news/publications/environmental/index.html.

Cathy Wills, ed

2012-09-12T23:59:59.000Z

97

Addendum to the Closure Report for Corrective Action Unit 113: Area 25 R-MAD Facility, Nevada National Security Site, Nevada  

SciTech Connect (OSTI)

This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.

NSTec Environmental Restoration

2011-02-24T23:59:59.000Z

98

Nevada Site Office Invites Public to Participate in Draft Nevada...  

Broader source: Energy.gov (indexed) [DOE]

2011 - 12:00pm Addthis Media Contacts Darwin J. Morgan morgan@nv.doe.gov 702-295-3521 Kelly K. Snyder snyderk@nv.doe.gov 702-295-3521 The U.S. Department of Energy (DOE),...

99

Nevada National Security Site Environmental Report 2012  

SciTech Connect (OSTI)

This report was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. It was prepared by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) (formerly designated as the Nevada Site Office [NNSA/NSO]). The new field office designation occurred in March 2013. Published reports cited in this 2012 report, therefore, may bear the name or authorship of NNSA/NSO. This and previous years’ reports, called Annual Site Environmental Reports (ASERs), Nevada Test Site Environmental Reports (NTSERs), and, beginning in 2010, Nevada National Security Site Environmental Reports (NNSSERs), are posted on the NNSA/NFO website at http://www.nv.energy.gov/library/publications/aser.aspx. This NNSSER was prepared to satisfy DOE Order DOE O 231.1B, “Environment, Safety and Health Reporting.” Its purpose is to (1) report compliance status with environmental standards and requirements, (2) present results of environmental monitoring of radiological and nonradiological effluents, (3) report estimated radiological doses to the public from releases of radioactive material, (4) summarize environmental incidents of noncompliance and actions taken in response to them, (5) describe the NNSA/NFO Environmental Management System and characterize its performance, and (6) highlight significant environmental programs and efforts. This NNSSER summarizes data and compliance status for calendar year 2012 at the Nevada National Security Site (NNSS) (formerly the Nevada Test Site) and its two support facilities, the North Las Vegas Facility (NLVF) and the Remote Sensing Laboratory–Nellis (RSL-Nellis). It also addresses environmental restoration (ER) projects conducted at the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). Through a Memorandum of Agreement, NNSA/NFO is responsible for the oversight of these ER projects, and the Sandia Site Office of NNSA (NNSA/SSO) has oversight of all other TTR and NTTR activities. NNSA/SSO produces the TTR annual environmental report available at http://www.sandia.gov/news/publications/environmental/index.html.

Wills, Cathy

2013-09-11T23:59:59.000Z

100

Nevada Test Site site treatment plan, final annual update. Revision 1  

SciTech Connect (OSTI)

A Site Treatment Plan (STP) is required for facilities at which the US Department of Energy Nevada Operations Office (DOE/NV) generates or stores mixed waste (MW), defined by the Federal Facility Compliance Act (FFCAct) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act (RCRA) and a radioactive material subject to the Atomic Energy Act. This STP was written to identify specific treatment facilities for treating DOE/NV generated MW and provides proposed implementation schedules. This STP was approved by the Nevada Division of Environmental Protection (NDEP) and provided the basis for the negotiation and issuance of the FFCAct Consent Order (CO) dated March 6, 1996. The FFCAct CO sets forth stringent regulatory requirements to comply with the implementation of the STP.

NONE

1998-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Distribution, life history, management, and current status of Astragalus beatleyae on the US Department of Energy's Nevada Test Site  

SciTech Connect (OSTI)

A beatleyae is a small milk vetch found in south-central Nevada on portions of the Nevada Test Site (NTS) and Nellis Air Force Range. This species has been classified as a Category 1 candidate species for federal listing under the Endangered Species Act because of its limited range and threats from human activities, primarily activities conducted by the US Department of Energy, Nevada Field Office (DOE/NV). The status of A. beatleyae was last evaluated over 13 years ago (Rhoads et al., 1979, Beatley, 1978). Since then, numerous conservation measures have been taken by DOE/NV and additional information on the status of this population has been obtained. Field surveys have been conducted to locate new populations of A. beatleyae. Because of this work, the known range of this species has been expanded approximately 300%. DOE/NV has established. a conservation agreement with the US Fish and Wildlife Service and developed a Species Management Plan. This report is a presentation of the results of that population monitoring study. Also included in this report are a review of other field investigations and conservation measures taken by DOE/NV, a review of the current threats to A. beatleyae, and a reassessment of the status of this species under the Endangered Species Act.

Blomquist, K.W.; Wills, C.A.; Ostler, W.K.; Rautenstrauch, K.R.; O'Farrell, T.P.

1992-11-01T23:59:59.000Z

102

Summary of Recommendations: Legislative and Regulatory Actions to Consider for Ensuring the Long-Term Effectiveness of the Nevada Renewable Portfolio Standard  

SciTech Connect (OSTI)

In 2001, the Nevada Legislature passed an aggressive renewable portfolio standard (Nevada RPS) that called for 5% of each major utility's resource mix to come from eligible renewable energy by 2003, rising by 2% every two years to 15% by 2013. Of the RPS standard, 5% per year must come from solar energy. The early performance of the Nevada RPS is generally considered to be disappointing. So far, only a small quantity of electricity state wide has been generated by new renewable energy systems. The utilities and many other stakeholders appear to agree that the utilities, which were unable to fully comply with the RPS in 2003, will continue to have difficulty complying in 2004 and 2005, and perhaps beyond. To date, there have been several efforts to improve compliance with the RPS (such as California and New Mexico). Other states in the region are also motivated to develop their renewable resources, and some have adopted RPS policies. A workshop as held on November 4, 2004 in Reno in order to address additional measures available to strengthen the Nevada RPS, and to consider the implications and potential interaction with RPS policies in nearby states. The purpose of this report is to identify and summarize the top policy priorities, from among those identified and discussed at the November 4, 2004 Reno Workshop, to be considered by the Nevada Renewable Energy and Energy Efficiency Task Force for implementation.

Porter, Kevin; Grace, Robert; Wiser, Ryan

2004-10-29T23:59:59.000Z

103

Sierra Nevada Ecosystem Project: Final report to Congress, Addendum. Davis: University of California, Centers for Water and Wildland Resources, 1996. Lake Tahoe Case Study  

E-Print Network [OSTI]

City, NV INTRODUCTION The Sierra Nevada Ecosystem Project (SNEP) selected the Lake Tahoe Basin as one of California, Centers for Water and Wildland Resources, 1996. 7 Lake Tahoe Case Study DEBORAH L. ELLIOTT University of California, Davis, CA CHARLES R. GOLDMAN Division of Environmental Studies University

Stephens, Scott L.

104

Nevada Test Site Resource Management Plan  

SciTech Connect (OSTI)

The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

NONE

1998-12-01T23:59:59.000Z

105

Nevada National Security Site Radiological Control Manual  

SciTech Connect (OSTI)

This document supersedes DOE/NV/25946--801, 'Nevada Test Site Radiological Control Manual,' Revision 1 issued in February 2010. Brief Description of Revision: A complete revision to reflect a recent change in name for the NTS; changes in name for some tenant organizations; and to update references to current DOE policies, orders, and guidance documents. Article 237.2 was deleted. Appendix 3B was updated. Article 411.2 was modified. Article 422 was re-written to reflect the wording of DOE O 458.1. Article 431.6.d was modified. The glossary was updated. This manual contains the radiological control requirements to be used for all radiological activities conducted by programs under the purview of the U.S. Department of Energy (DOE) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). Compliance with these requirements will ensure compliance with Title 10 Code of Federal Regulations (CFR) Part 835, 'Occupational Radiation Protection.' Programs covered by this manual are located at the Nevada National Security Site (NNSS); Nellis Air Force Base and North Las Vegas, Nevada; Santa Barbara and Livermore, California; and Andrews Air Force Base, Maryland. In addition, fieldwork by NNSA/NSO at other locations is covered by this manual. Current activities at NNSS include operating low-level radioactive and mixed waste disposal facilities for United States defense-generated waste, assembly and execution of subcritical experiments, assembly/disassembly of special experiments, the storage and use of special nuclear materials, performing criticality experiments, emergency responder training, surface cleanup and site characterization of contaminated land areas, environmental activity by the University system, and nonnuclear test operations, such as controlled spills of hazardous materials at the Hazardous Materials Spill Center. Currently, the major potential for occupational radiation exposure is associated with the burial of low-level radioactive waste and the handling of radioactive sources. Remediation of contaminated land areas may also result in radiological exposures.

Radiological Control Managers’ Council

2012-03-26T23:59:59.000Z

106

Environmental assessment for device assembly facility operations, Nevada Test Site, Nye County, Nevada. Final report  

SciTech Connect (OSTI)

The U.S. Department of Energy, Nevada Operations Office (DOE/NV), has prepared an environmental assessment (EA), (DOE/EA-0971), to evaluate the impacts of consolidating all nuclear explosive operations at the newly constructed Device Assembly Facility (DAF) in Area 6 of the Nevada Test Site. These operations generally include assembly, disassembly or modification, staging, transportation, testing, maintenance, repair, retrofit, and surveillance. Such operations have previously been conducted at the Nevada Test Site in older facilities located in Area 27. The DAF will provide enhanced capabilities in a state-of-the-art facility for the safe, secure, and efficient handling of high explosives in combination with special nuclear materials (plutonium and highly enriched uranium). Based on the information and analyses in the EA, DOE has determined that the proposed action would not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.). Therefore, an environmental impact statement is not required, and DOE is issuing this finding of no significant impact.

NONE

1995-05-01T23:59:59.000Z

107

Nevada Test Site Environmental Report 2005, Attachment A - Site Description  

SciTech Connect (OSTI)

This appendix to the ''Nevada Test Site Environmental Report 2005'', dated October 2006 (DOE/NV/11718--1214; DOE/NV/25946--007) expands on the general description of the Nevada Test Site (NTS) presented in the Introduction. Included are subsections that summarize the site?s geological, hydrological, climatological, and ecological setting. The cultural resources of the NTS are also presented. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NTS. An adequate knowledge of the site's environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NTS. The NTS environment contributes to several key features of the site which afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NTS operations. These key features include the general remote location of the NTS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This appendix complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.

Cathy A. Wills

2006-10-01T23:59:59.000Z

108

Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 135, Area 25 Underground Storage Tanks (USTs), which is located on the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada.

U.S. Department of Energy, Nevada Operations Office

1999-05-05T23:59:59.000Z

109

Determining factors for Eurasian watermilfoil (M. spicatum) spread in and around Lake Tahoe, CA-NV  

E-Print Network [OSTI]

in and around Lake Tahoe, CA-NV Bruce Kendall Associatein New York State and Tahoe in CA-NV and subsequently thefor biological uptake), K+, Ca+2, Mg+2, Fe, and Mn. The

Kendall, Bruce E.; MacIntyre, Sally

2008-01-01T23:59:59.000Z

110

RAPID/Roadmap/19-NV-a | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExploration JumpSanyalTempWellheadWahkiakumNV-a Nonpoint7-FD-a9-AK-a9-NM-df19-NV-a

111

RAPID/Roadmap/20-NV-a | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExploration JumpSanyalTempWellheadWahkiakumNV-a20-AK-a Well Abandonment20-NV-a Well

112

RAPID/Roadmap/3-NV-a | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExploration JumpSanyalTempWellheadWahkiakumNV-a20-AK-a WellAK-g3-NM-b State3-NV-a

113

RAPID/Roadmap/14-NV-e | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, search RAPIDColorado < RAPID‎ |1-TX-a13-ID-a4-NV-c Underground4-NV-e

114

RAPID/Roadmap/8-NV-d | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, search RAPIDColorado <17-HI-a4-WA-a7-CA-e8-HI-a8-NV-c Certificate of8-NV-d

115

Distribution, life history, management, and current status of Astragalus beatleyae on the US Department of Energy`s Nevada Test Site  

SciTech Connect (OSTI)

A beatleyae is a small milk vetch found in south-central Nevada on portions of the Nevada Test Site (NTS) and Nellis Air Force Range. This species has been classified as a Category 1 candidate species for federal listing under the Endangered Species Act because of its limited range and threats from human activities, primarily activities conducted by the US Department of Energy, Nevada Field Office (DOE/NV). The status of A. beatleyae was last evaluated over 13 years ago (Rhoads et al., 1979, Beatley, 1978). Since then, numerous conservation measures have been taken by DOE/NV and additional information on the status of this population has been obtained. Field surveys have been conducted to locate new populations of A. beatleyae. Because of this work, the known range of this species has been expanded approximately 300%. DOE/NV has established. a conservation agreement with the US Fish and Wildlife Service and developed a Species Management Plan. This report is a presentation of the results of that population monitoring study. Also included in this report are a review of other field investigations and conservation measures taken by DOE/NV, a review of the current threats to A. beatleyae, and a reassessment of the status of this species under the Endangered Species Act.

Blomquist, K.W.; Wills, C.A.; Ostler, W.K.; Rautenstrauch, K.R.; O`Farrell, T.P.

1992-11-01T23:59:59.000Z

116

Nevada National Security Site  

Broader source: Energy.gov [DOE]

HISTORYIn 1950, President Truman established what is now known as the Nevada National Security Site (NNSS) to perform nuclear weapons testing activities.  In support of national defense initiatives...

117

Species-specific responses to atmospheric carbon dioxide and tropospheric ozone mediate changes  

E-Print Network [OSTI]

Resources and Environmental Science, University of Nevada, Reno, NV 89512, USA 2 School of Natural Resources repeatedly sampled the surface mineral soil (0­20 cm depth) in three northern temperate forest communities, decomposition, global change, long-term, northern temperate forests. Ecology Letters (2009) 12: 1219

118

Atmos. Chem. Phys., 10, 53155341, 2010 www.atmos-chem-phys.net/10/5315/2010/  

E-Print Network [OSTI]

analysis during MILAGRO using high resolution aerosol mass spectrometry at the urban supersite (T0) ­ Part of Nevada and the Desert Research Institute, Reno, NV, USA 14Molina Center for Energy and the Environment at the T0 urban su- persite in Mexico City with a High-Resolution Aerosol Mass Spectrometer (AMS

119

New Zealand Geothermal Workshop 2011 Proceedings 21 -23 November 2011  

E-Print Network [OSTI]

and William Honjas2 1 Great Basin Center for Geothermal Energy, Mailstop 0174, University of Nevada, Reno, NV1 New Zealand Geothermal Workshop 2011 Proceedings 21 - 23 November 2011 Auckland, New Zealand ADVANCED SEISMIC IMAGING FOR GEOTHERMAL DEVELOPMENT John N. Louie1 , Satish K. Pullammanappallil2

120

Neural Networks 32 (2012) 130137 Contents lists available at SciVerse ScienceDirect  

E-Print Network [OSTI]

, USA c Department of Electrical and Biomedical Engineering, University of Nevada, Reno, NV 89557, USA d at the neurological level of a human brain. Recent studies suggest that oxytocin is a centrally. 1. Introduction Computational neuroscience is an interdisciplinary science, which combines diverse

Dascalu, Sergiu

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Accepted to the 10 International Conference on Cognitive and Neural Systems (ICCNS), May 17-20,  

E-Print Network [OSTI]

and Elie Bienenstock2 1 Dept. of Computer Science and Engineering/171, University of Nevada, Reno NV 89557 a constraint of heterosynaptic competition. Hebbian plasticity is one of the major principles underlying ms). Synaptic weight modification occurs in three simple stages. First, all weights are potentiated

Bienenstock, Elie

122

*indicates change 1 BEFORE THE ENERGY RESOURCES CONSERVATION AND DEVELOPMENT  

E-Print Network [OSTI]

FOR RELIABLE ENERGY (Revised 9/12/11) RESPONDENT Ormat Nevada, Inc. 6225 Neil Road Reno, NV 89511 COUNSEL.state.ca.us Jeff Ogata Assistant Chief Counsel jogata@energy.state.ca.us ENERGY COMMISSION PUBLIC ADVISER Jennifer*indicates change 1 BEFORE THE ENERGY RESOURCES CONSERVATION AND DEVELOPMENT COMMISSION

123

Proceedings World Geothermal Congress 2010 Bali, Indonesia, 25-29 April 2010  

E-Print Network [OSTI]

Proceedings World Geothermal Congress 2010 Bali, Indonesia, 25-29 April 2010 1 Characterizing Structural Controls of Geothermal Reservoirs in the Great Basin, USA, and Western Turkey: Developing 89557, USA 2 Great Basin Center for Geothermal Energy, University of Nevada, Reno, NV 89557, USA 3 BRGM

Paris-Sud XI, Université de

124

Production and Injection data for NV Binary facilities  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Excel files are provided with well production and injection data for binary facilities in Nevada. The files contain the data that reported montly to the Nevada Bureau of Mines and Geology (NBMG) by the facility operators. this data has been complied into Excel spreadsheets for each of the facilities given on the NBMG web site.

Mines, Greg

125

Production and Injection data for NV Binary facilities  

SciTech Connect (OSTI)

Excel files are provided with well production and injection data for binary facilities in Nevada. The files contain the data that reported montly to the Nevada Bureau of Mines and Geology (NBMG) by the facility operators. this data has been complied into Excel spreadsheets for each of the facilities given on the NBMG web site.

Mines, Greg

2013-12-24T23:59:59.000Z

126

Water Resources Data Nevada Water Year 2002 Water-Data Report NV-02-1  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Reviewwill help prepareA Review ScientificUSAFiStart370-Rev.

127

Nevada Environmental Restoration Project DOE/NV-368 Project Chariot S  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545*.MSE Cores" _ ,' ,:.' :r-2 .

128

EA-1849: Ormat Nevada Geothermal Projects in Northern NV | Department of  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy CooperationRequirements Matrix U.S.7685 Vol. 76,NextSaginaw, MI |

129

DOE/NV-441 Nevada Environmental Restoration Project Rulison Drilling Effluent  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545*. . : '* FEB1 Rev. 0I . )) ;i 'Ru\--

130

Translational genomics of Vegetable Crops Las Vegas, NV  

E-Print Network [OSTI]

Translational genomics of Vegetable Crops Las Vegas, NV July 21, 2005 David Francis and Allen Van Deynze At the recent ASHS meetings in Las Vegas, a workshop "Translational Genomics of Vegetable Crops interventions" (Minna and Gazdar, 1996). In applied plant science, "translational genomics" implies

Douches, David S.

131

NV: Nessus Vulnerability Visualization for the Web Lane Harrison  

E-Print Network [OSTI]

NV: Nessus Vulnerability Visualization for the Web Lane Harrison Oak Ridge National Laboratory Oak Ridge TN, USA harrisonlt@ornl.gov Riley Spahn Oak Ridge National Laboratory Oak Ridge TN, USA spahnrb1@ornl.gov Mike Iannacone Oak Ridge National Laboratory Oak Ridge TN, USA iannaconemd@ornl.gov Evan

Kaiser, Gail E.

132

CBER-DETR Nevada Coincident and Leading Employment Benchmark Revisions Add Employment to Nevada  

E-Print Network [OSTI]

Statistics. The Nevada Coincident EmploymentCBER-DETR Nevada Coincident and Leading Employment Indexes1 Benchmark Revisions Add Employment to Nevada The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using

Ahmad, Sajjad

133

Corrective Action Decision Document/Closure Report for Corrective Action Unit 232: Area 25 Sewage Lagoons, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 232, Area 25 Sewage Lagoons, in accordance with the Federal Facility Agreement and Consent Order. Located at the Nevada Test Site in Nevada, approximately 65 miles northwest of Las Vegas, CAU 232 is comprised of Corrective Action Site 25-03-01, Sewage Lagoon. This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action is deemed necessary for CAU 232. The Corrective Action Decision Document and Closure Report have been combined into one report because sample data collected during the July 1999 corrective action investigation (CAI) activities disclosed no evidence of contamination at the site. Contaminants of potential concern (COPCs) addressed during the CAI included total volatile organic compounds, total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, total pesticides, total herbicides, total petroleum hydrocarbons (gasoline and diesel/oil range), polychlorinated biphenyls, isotopic uranium, isotopic plutonium, strontium-90, and gamma-emitting radionuclides. The data confirmed that none of the COPCs identified exceeded preliminary action levels outlined in the CAIP; therefore, no corrective actions were necessary for CAU 232. After the CAI, best management practice activities were completed and included installation of a fence and signs to limit access to the lagoons, cementing Manhole No. 2 and the diverter box, and closing off influent and effluent ends of the sewage lagoon piping. As a result of the CAI, the DOE/NV recommended that: (1) no further actions were required; (2) no Corrective Action Plan would be required; and (3) no use restrictions were required to be placed on the CAU.

US Department of Energy Nevada Operations Office

1999-12-23T23:59:59.000Z

134

Post-Closure Monitoring Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Effluent Nevada Test Site, Nevada  

SciTech Connect (OSTI)

The Area 12 Fleet Operations Steam Cleaning Effluent site is located in the southeastern portion of the Area 12 Camp at the Nevada Test Site. This site is identified in the Federal Facility Agreement and Consent Order (1996) as Corrective Action Site (CAS) 12-19-01 and is the only CAS assigned to Corrective Action Unit (CAU) 339. Post-closure sampling and inspection of the site were completed on March 27, 2002. Post-closure monitoring activities were scheduled biennially (every two years) in the Post-Closure Monitoring Plan provided in the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Effluent, Nevada Test Site (U.S. Department of Energy, Nevada Operations Office [DOEN], 1997). A baseline for the site was established by sampling in 1997. Based on the recommendations from the 1999 post-closure monitoring report (DOE/NV, 1999), samples were collected in 2000, earlier than originally proposed, because the 1999 sample results did not provide the expected decrease in total petroleum hydrocarbon (TPH) concentrations at the site. Sampling results from 2000 (DOE/NV, 2000) and 2001 (DOE/NV, 2001) revealed favorable conditions for natural degradation at the CAU 339 site, but because of differing sample methods and heterogeneity of the soil, data results from 2000 and later were not directly correlated with previous results. Post-closure monitoring activities for 2002 consisted of the following: (1) Soil sample collection from three undisturbed plots (Plots A, B, and C, Figure 2). (2) Sample analysis for TPH as oil and bio-characterization parameters (Comparative Enumeration Assay [CEA] and Standard Nutrient Panel [SNP]). (3) Site inspection to evaluate the condition of the fencing and signs. (4) Preparation and submittal of the Post-Closure Monitoring Report.

K. B. Campbell

2002-09-01T23:59:59.000Z

135

New Results from RENO and The 5 MeV Excess  

E-Print Network [OSTI]

One of the main goals of RENO (Reactor Experiment for Neutrino Oscillation) is to measure the smallest neutrino mixing angle {\\theta}13 using reactor neutrinos in Korea. RENO is the first reactor experiment taking data with two identical detectors in different locations (Near and Far), which is critical to reduce systematic uncertainty in reactor neutrino flux. Our data taking has been almost continuous since Aug. 2011 and we have collected about 434,000 (54,000) electron anti-neutrinos in the Near (Far) detector by 2013. Using this data (about 800 live days) we present a new result on {\\theta}13: sin22{\\theta}13 = 0.101 +/- 0.008 (stat.) +/- 0.010 (syst.). We also report the 5 MeV excess present in the prompt signal spectrum in our data, and its correlation with our reactor thermal power.

Seon-Hee Seo for the RENO Collaboration

2014-10-29T23:59:59.000Z

136

Adaptive Management Plan for Sensitive Plant Species on the Nevada Test Site  

SciTech Connect (OSTI)

The Nevada Test Site supports numerous plant species considered sensitive because of their past or present status under the Endangered Species Act and with federal and state agencies. In 1998, the U.S. Department of Energy, Nevada Operation Office (DOE/NV) prepared a Resource Management Plan which commits to protects and conserve these sensitive plant species and to minimize accumulative impacts to them. This document presents the procedures of a long-term adaptive management plan which is meant to ensure that these goals are met. It identifies the parameters that are measured for all sensitive plant populations during long-term monitoring and the adaptive management actions which may be taken if significant threats to these populations are detected. This plan does not, however, identify the current list of sensitive plant species know to occur on the Nevada Test Site. The current species list and progress on their monitoring is reported annually by DOE/NV in the Resource Management Plan.

C. A. Wills

2001-03-01T23:59:59.000Z

137

Corrective action investigation plan for Corrective Action Unit 340, Pesticide Release Sites, Nevada Test Site, Nye County, Nevada  

SciTech Connect (OSTI)

This Correction Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. As required by the FFACO (1996), this document provides or references all of the specific information for planning investigation activities associated with three Corrective Action Sites (CASs) located at the Nevada Test Site (NTS). These CASs are collectively known as Corrective Action Unit (CAU) 340, Pesticide Release Sites. According to the FFACO, CASs are sites that may require corrective action(s) and may include solid waste management units or individual disposal or release sites. These sites are CAS 23-21-01, Area 23 Quonset Hut 800 (Q800) Pesticide Release Ditch; CAS 23-18-03, Area 23 Skid Huts Pesticide Storage; and CAS 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage (Q15-11). The purpose of this CAIP for CAU 340 is to direct and guide the investigation for the evaluation of the nature and extent of pesticides, herbicides, and other contaminants of potential concern (COPCs) that were stored, mixed, and/or disposed of at each of the CASs.

NONE

1998-01-01T23:59:59.000Z

138

Corrective Action Investigation Plan for Corrective Action Unit 240: Area 25 Vehicle Washdown Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 240, Area 25 Vehicle Washdown, which is located on the Nevada Test Site (NTS).

DOE/NV

1999-01-25T23:59:59.000Z

139

Final Characterization Report for Corrective Action Unit 109: Area 2 U-2BU Crater, Nevada Test Site, Nevada, Revision 1  

SciTech Connect (OSTI)

Corrective Action Unit 109, Area 2 U-2bu Crater, is an inactive Resource Conservation and Recovery Act Part A Permit disposal unit located in Area 2 at the Nevada Test Site, Nevada. The Corrective Action Unit has been characterized under the requirements of the Nevada Test Site Resource Conservation and Recovery Act, Part A Permit (NDEP, 1995) and Title 40 Code of Federal Regulations Part 265 (CFR, 1996). The site characterization was performed under the RCRA Part A Permit Characterization Plan for the U-2bu Subsidence Crater (DOE/NV, 1998c), as approved by the Nevada Division of Environmental Protection (Liebendorfer, 1998). The primary objective of the site characterization activities was to evaluate the presence, concentration, and extent of any Resource Conservation and Recovery Act contaminants in the crater. Surface soil samples were collected on April 22, 1998, and subsurface soil samples and geotechnical samples were collected from April 27-29, 1998. Soil samples were collected using a hand auger or a piston-type drive hammer to advance a 5-centimeter (2-inch) diameter steel sampling tool into the ground. The permit for the Nevada Test Site requires that Corrective Action Unit 109 be closed under 40 Code of Federal Regulations 265 Subpart G and 40 Code of Federal Regulations Part 265.310 (CFR, 1996). Analysis of the data collected during the characterization effort indicates that lead was detected in Study Area 1 at 5.7 milligrams per liter, above the regulatory level in 40 Code of Federal Regulations 261.24 of 5.0 milligrams per liter. Except for the lead detection at a single location within the crater, the original Resource Conservation Recovery Act constituents of potential concern determined between the U.S. Department of Energy, Nevada Operations Office and the Nevada Department of Environmental Protection during the Data Quality Objectives process (DOE/NV, 1998b) were not found to be present at Corrective Action Unit 109 above regulatory levels of concern. The single lead detection that exceeded regulatory limits was discovered at a depth of 1.2 meters (4 feet) in Study Area 1. Total petroleum hydrocarbons were detected in Study Area 4 at two locations at concentrations of 130 and 190 milligrams per kilogram. These concentrations exceed the 100 milligram per kilogram action level established in Nevada Administrative Code 445A.2272 (NAC, 1996). The primary conceptual model identified during the Data Quality Objectives process appears to have been substantiated by the analytical results from site characterization; migration of contaminants of potential concern does not appear to be occurring, as none were detected in a significant percentage of the characterization samples. Based on the results of the characterization, clean closure by removal and disposal of impacted soil will be evaluated in the closure plan to address Study Area 1. An (a) through (k) analysis, as specified in Nevada Administrative Code 445A.227, should be used to evaluate total petroleum hydrocarbon contamination within Study Area 4. Study Areas 2, 3, and 5 should be clean closed without further assessment or remediation (see Figures 2-1 and 5-1 in the Characterization Report).

ITLV

1998-12-01T23:59:59.000Z

140

46th AIAA Aerospace Sciences Meeting and Exhibit Jan 7 10, 2008, Reno, Nevada AIAA-2008-0315  

E-Print Network [OSTI]

and civilian applications. The applications include propellers, sailplanes, ultralight man-carrying/man-powered aircraft, high-altitude vehicles, wind turbines, unmanned aerial vehicles (UAVs), and micro air vehicles

Hu, Hui

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

45th AIAA Aerospace Sciences Meeting and Exhibit Jan 8 11, 2007, Reno, Nevada AIAA-2007-0275  

E-Print Network [OSTI]

. These applications include propellers, sailplanes, ultra-light man-carrying/man-powered aircraft, high-altitude vehicles, wind turbines, unmanned aerial vehicles (UAVs) and Micro-Air-Vehicles (MAVs). Non

Hu, Hui

142

44th AIAA Aerospace Sciences Meeting and Exhibit 9 -12 Jan 2006, Reno, Nevada Spatiotemporal Waveform Observers and Feedback in  

E-Print Network [OSTI]

and temporal high frequency noise. The discussion is illustrated by simulations and wind tunnel experiments in a turbine engine combustor.5 Pulsating synthetic jet actuation, exciting selected vortex release frequencies

Noack, Bernd R.

143

45th AIAA Aerospace Sciences Meeting and Exhibit AIAA-2007-0172 Reno, Nevada, 8 -11 Jan 2007  

E-Print Network [OSTI]

-Fueled Stagnation Point Reverse Flow Combustor P. Gopalakrishnan , M. K. Bobba , A. Radhakrishnan , Y. Neumeier, GA 30332-0150 The Stagnation Point Reverse Flow (SPRF) combustor has been shown to operate stably and laser scattering, are employed to elucidate the combustion processes of this novel combustor in liquid

Seitzman, Jerry M.

144

MATH/STAT 352: Probability and Statistics -Summer 2013 Department of Mathematics and Statistics, University of Nevada Reno  

E-Print Network [OSTI]

MATH/STAT 352: Probability and Statistics - Summer 2013 Department of Mathematics and Statistics Course Description MATH/STAT 352 is a calculus-based introduction to the basic ideas of probability Server at http://www.knowledgecenter.unr.edu/dataworks/citrixinfo.html with your Net ID. The knowledge

Kozubowski, Tomasz J.

145

MATH/STAT 352: Probability and Statistics -Summer 2014 Department of Mathematics and Statistics, University of Nevada Reno  

E-Print Network [OSTI]

MATH/STAT 352: Probability and Statistics - Summer 2014 Department of Mathematics and Statistics Course Description MATH/STAT 352 is a calculus-based introduction to the basic ideas of probability Server at http://www.knowledgecenter.unr.edu/dataworks/citrixinfo.html with your Net ID. The knowledge

Kozubowski, Tomasz J.

146

MATH/STAT 352: Probability and Statistics -Summer 2012 Department of Mathematics and Statistics, University of Nevada Reno  

E-Print Network [OSTI]

MATH/STAT 352: Probability and Statistics - Summer 2012 Department of Mathematics and Statistics Course Description MATH/STAT 352 is a calculus-based introduction to the basic ideas of probability Server at http://www.knowledgecenter.unr.edu/dataworks/citrixinfo.html with your Net ID. The knowledge

Kozubowski, Tomasz J.

147

Depth to bedrock using gravimetry in the Reno and Carson City, Nevada, basins Robert E. Abbott and John N. Louie  

E-Print Network [OSTI]

of geothermal wells, and one wildcat oil well. Depths in Carson City are consistent with depths from existing

148

Special Nevada report  

SciTech Connect (OSTI)

This report is submitted to Congress by the Secretary of the Air Force, the Secretary of the Navy, and the Secretary of the Interior pursuant to Section 6 of the Military Lands Withdrawal Act of 1986. It contains an analysis and evaluation of the effects on public health and safety resulting from DOD and Department of Energy (DOE) military and defense-related uses on withdrawn public lands in the State of Nevada and in airspace overlying the State. This report describes the cumulative impacts of those activities on public and private property in Nevada and on plants, fish and wildlife, cultural, historic, scientific, recreational, wilderness and other resources of the public lands of Nevada. An analysis and evaluation of possible measures to mitigate the cumulative effects of the withdrawal of lands and the use of airspace in Nevada for defense-related purposes was conducted, and those considered practical are listed.

NONE

1991-09-23T23:59:59.000Z

149

Corrective Action Investigation Plan for Corrective Action Unit 565: Stored Samples, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 565 is located in Area 26 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 565 is comprised of one corrective action site (CAS) listed--CAS 26-99-04, Ground Zero Soil Samples. This site is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend closure of CAU 565. Additional information will be obtained by conducting a corrective action investigation before evaluating closure objectives and selecting the appropriate corrective action. The results of the field investigation will support closure and waste management decisions that will be presented in the Corrective Action Decision Document/Closure Report. The site will be investigated based on the data quality objectives (DQOs) developed on June 1, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was utilized to identify and define the type, amount, and quality of data needed to develop and evaluate closure for CAU 565. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to this CAS. The scope of the corrective action investigation for CAU 565 includes the following activities: (1) Remove stored samples, shelves, and debris from the interior of Building 26-2106. (2) Perform field screening on stored samples, shelves, and debris. (3) Dispose of stored samples, shelves, and debris. (4) Collect samples of investigation-derived waste, as needed, for waste management purposes. (5) Conduct radiological surveys of Building 26-2106 in accordance with the requirements in the ''NV/YMP Radiological Control Manual'' to determine if there is residual radiological contamination that would prevent the release of the building for unrestricted use. This Corrective Action Investigation has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan.

Wickline, Alfred; McCall, Robert

2006-08-01T23:59:59.000Z

150

Corrective Action Decision Document/ Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface Central Nevada Test Area, Nevada, Rev. No. 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the subsurface at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, CNTA - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). CAU 443 is located in Hot Creek Valley in Nye County, Nevada, north of U.S. Highway 6, about 48 kilometers north of Warm Springs, Nevada. The CADD/CAP combines the decision document (CADD) with the corrective action plan (CAP) and provides or references the specific information necessary to recommend corrective actions for the UC-1 Cavity (Corrective Action Site 58-57-001) at CAU 443, as provided in the FFACO. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at CNTA. To achieve this, the following tasks were required: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend a preferred corrective action alternative for the subsurface at CNTA. A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first involved the gathering and interpretation of geologic and hydrogeologic data into a three-dimensional numerical model of groundwater flow, and use of the output of the flow model for a transport model of radionuclide release and migration behavior (Pohlmann et al., 2000). The second modeling phase (known as a Data Decision Analysis [DDA]) occurred after the Nevada Division of Environmental Protection reviewed the first model and was designed to respond to concerns regarding model uncertainty (Pohll and Mihevc, 2000). The third modeling phase updated the original flow and transport model to incorporate the uncertainty identified in the DDA, and focused the model domain on the region of interest to the transport predictions. This third phase culminated in the calculation of contaminant boundaries for the site (Pohll et al., 2003).

Susan Evans

2004-11-01T23:59:59.000Z

151

Nevada State Energy Reduction Plan  

Broader source: Energy.gov [DOE]

As mandated by the Nevada statutes, the Nevada Energy Office prepared a state energy reduction plan which requires state agencies, departments, and other entities in the Executive Branch to reduce...

152

Closure Report for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

The purpose of this Closure Report (CR) is to provide documentation of the completed corrective action at the Test Cell A Leachfield System and to provide data confirming the corrective action. The Test Cell A Leachfield System is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Corrective Action Unit (CAU) 261. Remediation of CAU 261 is required under the FFACO (1996). CAU 261 is located in Area 25 of the Nevada Test Site (NTS) which is approximately 140 kilometers (87 miles) northwest of Las Vegas, Nevada (Figure 1). CAU 261 consists of two Corrective Action Sites (CASS): CAS 25-05-01, Leachfield; and CAS 25-05-07, Acid Waste Leach Pit (AWLP) (Figures 2 and 3). Test Cell A was operated during the 1960s and 1970s to support the Nuclear Rocket Development Station. Various operations within Building 3124 at Test Cell A resulted in liquid waste releases to the Leachfield and the AWLP. The following existing site conditions were reported in the Corrective Action Decision Document (CADD) (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1999): Soil in the leachfield was found to exceed the Nevada Division of Environmental Protection (NDEP) Action Level for petroleum hydrocarbons, the U.S. Environmental Protection Agency (EPA) preliminary remediation goals for semi volatile organic compounds, and background concentrations for strontium-90; Soil below the sewer pipe and approximately 4.5 meters (m) (15 feet [ft]) downstream of the initial outfall was found to exceed background concentrations for cesium-137 and strontium-90; Sludge in the leachfield septic tank was found to exceed the NDEP Action Level for petroleum hydrocarbons and to contain americium-241, cesium-137, uranium-234, uranium-238, potassium-40, and strontium-90; No constituents of concern (COC) were identified at the AWLP. The NDEP-approved CADD (DOWNV, 1999) recommended Corrective Action Alternative 2, ''Closure of the Septic Tank and Distribution Box, Partial Excavation, and Administrative Controls.'' The corrective action was performed following the NDEP-approved Corrective Action Plan (CAP) (DOE/NV, 2000).

T. M. Fitzmaurice

2001-04-01T23:59:59.000Z

153

Seismicity in the Vicinity of Yucca Mountain, Nevada, for the Period October 1, 2004 to September 30, 2006  

SciTech Connect (OSTI)

This report describes earthquake activity within approximately 65 km of Yucca Mountain site during the October 1, 2004 to September 30, 2006 time period (FY05-06). The FY05-06 earthquake activity will be compared with the historical and more recent period of seismic activity in the Yucca Mountain region. The relationship between the distribution of seismicity and active faults, historical patterns of activity, and rates of earthquakes (number of events and their magnitudes) are important components in the assessment of the seismic hazard for the Yucca Mountain site. Since October 1992 the University of Nevada has compiled a catalog of earthquakes in the Yucca Mountain area. Seismicity reports have identified notable earthquake activity, provided interpretations of the seismotectonics of the region, and documented changes in the character of earthquake activity based on nearly 30 years of site-characterization monitoring. Data from stations in the seismic network in the vicinity of Yucca Mountain is collected and managed at the Nevada Seismological Laboratory (NSL) at the University of Nevada Reno (UNR). Earthquake events are systematically identified and cataloged under Implementing Procedures developed in compliance with the Nevada System of Higher Education (NSHE) Quality Assurance Program. The earthquake catalog for FY05-06 in the Yucca Mountain region submitted to the Yucca Mountain Technical Data Management System (TDMS) forms the basis of this report.

Smith, Ken

2007-11-26T23:59:59.000Z

154

Closure Report for Corrective Action Unit 523: Housekeeping Waste, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This closure report documents the closure activities conducted for Corrective Action Unit 523: Housekeeping Waste, Nevada Test Site, Nevada.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

2003-11-01T23:59:59.000Z

155

NNSA Network Vision (2NV) | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recovery challengeMultiscaleLogosAdministrationNetwork Vision (2NV) | National

156

DNA-NV-030-09-03 | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:EnergyWisconsin:2003)CrowleyEnergyMasse) Jump to:DEXA JumpDNA-NV-030-09-03 Jump

157

Category:Las Vegas, NV | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectricEnergyCTBarreis aCallahanWind FarmAdd a newISGAN DefinitionsNV" The

158

RAPID/Roadmap/13-NV-a | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExploration JumpSanyalTempWellheadWahkiakum CountyPzero-FD-b3 Land13-NV-a State Land

159

RAPID/Roadmap/14-NV-a | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExploration JumpSanyalTempWellheadWahkiakumNV-a Nonpoint Source Pollution

160

RAPID/Roadmap/14-NV-b | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExploration JumpSanyalTempWellheadWahkiakumNV-a Nonpoint Source Pollutionb <

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

RAPID/Roadmap/4-NV-c | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g Grant of Access Permit 03UTGGrantOfAccessPermit.pdf Click4-FD-c4-NV-c

162

RAPID/Roadmap/5-NV-a | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g Grant of Access Permit5-ID-a Drilling and Well Development5-MT-a5-NV-a

163

RAPID/Roadmap/7-NV-a | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g Grant of Access Permit5-ID-a Drilling7-HI-c Certificate ofc <7-NV-a

164

RAPID/Roadmap/8-NV-a | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g Grant of Access Permit5-ID-a Drilling7-HI-ce < RAPID‎ |8-NM-bNV-a

165

RAPID/Roadmap/14-NV-c | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, search RAPIDColorado < RAPID‎ |1-TX-a13-ID-a4-NV-c Underground Injection

166

RAPID/Roadmap/14-NV-d | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, search RAPIDColorado < RAPID‎ |1-TX-a13-ID-a4-NV-c Underground

167

RAPID/Roadmap/15-NV-a | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, search RAPIDColorado < RAPID‎RAPID/Roadmap/15-CA-b <NM-c <5-NV-a

168

RAPID/Roadmap/18-NV-b | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, search RAPIDColorado <17-HI-a < RAPID‎ |18-MT-b Hazardous8-NV-b State

169

RAPID/Roadmap/18-NV-c | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, search RAPIDColorado <17-HI-a < RAPID‎ |18-MT-b Hazardous8-NV-b

170

RAPID/Roadmap/3-NV-c | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, search RAPIDColorado <17-HI-a <3-FD-d Foresto3-NM-d StateNV-c State

171

RAPID/Roadmap/3-NV-d | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, search RAPIDColorado <17-HI-a <3-FD-d Foresto3-NM-d StateNV-c

172

RAPID/Roadmap/4-NV-a | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, search RAPIDColorado <17-HI-a <3-FD-d3-WA-bRAPID/Roadmap/4-NV-a <

173

RAPID/Roadmap/4-NV-b | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, search RAPIDColorado <17-HI-a <3-FD-d3-WA-bRAPID/Roadmap/4-NV-a

174

RAPID/Roadmap/6-NV-b | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, search RAPIDColorado <17-HI-a4-WA-a State6-CO-bc < RAPID‎NV-b

175

RAPID/Roadmap/7-NV-c | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, search RAPIDColorado <17-HI-a4-WA-a7-CA-e BLM/CEC Joint7-HI-bID-c7-NV-c

176

RAPID/Roadmap/8-NV-c | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, search RAPIDColorado <17-HI-a4-WA-a7-CA-e8-HI-a8-NV-c Certificate of

177

Energies Nouvelles et Environnement NV ENE | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump37. It is classifiedProject)EnerVault CorporationSolaire JumpEnvironnement NV

178

Deterministic coupling of delta-doped NV centers to a nanobeam photonic crystal cavity  

E-Print Network [OSTI]

The negatively-charged nitrogen vacancy center (NV) in diamond has generated significant interest as a platform for quantum information processing and sensing in the solid state. For most applications, high quality optical cavities are required to enhance the NV zero-phonon line (ZPL) emission. An outstanding challenge in maximizing the degree of NV-cavity coupling is the deterministic placement of NVs within the cavity. Here, we report photonic crystal nanobeam cavities coupled to NVs incorporated by a delta-doping technique that allows nanometer-scale vertical positioning of the emitters. We demonstrate cavities with Q up to ~24,000 and mode volume V ~ $0.47({\\lambda}/n)^{3}$ as well as resonant enhancement of the ZPL of an NV ensemble with Purcell factor of ~20. Our fabrication technique provides a first step towards deterministic NV-cavity coupling using spatial control of the emitters.

Jonathan C. Lee; David O. Bracher; Shanying Cui; Kenichi Ohno; Claire A. McLellan; Xingyu Zhang; Paolo Andrich; Benjamin Aleman; Kasey J. Russell; Andrew P. Magyar; Igor Aharonovich; Ania Bleszynski Jayich; David Awschalom; Evelyn L. Hu

2014-11-03T23:59:59.000Z

179

Nevada Test Site Radiation Protection Program - Revision 1  

SciTech Connect (OSTI)

Title 10 Code of Federal Regulations (CFR) Part 835, 'Occupational Radiation Protection,' establishes radiation protection standards, limits, and program requirements for protecting individuals from ionizing radiation resulting from the conduct of U.S. Department of Energy (DOE) activities. 10 CFR 835.101(a) mandates that DOE activities be conducted in compliance with a documented Radiation Protection Program (RPP) as approved by DOE. This document promulgates the RPP for the Nevada Test Site (NTS), related (on-site or off-site) U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) operations, and environmental restoration off-site projects. This NTS RPP promulgates the radiation protection standards, limits, and program requirements for occupational exposure to ionizing radiation resulting from NNSA/NSO activities at the NTS and other operational areas as stated in 10 CFR 835.1(a). NNSA/NSO activities (including design, construction, operation, and decommissioning) within the scope of this RPP may result in occupational exposures to radiation or radioactive material. Therefore, a system of control is implemented through specific references to the site-specific NV/YMP RCM. This system of control is intended to ensure that the following criteria are met: (1) occupational exposures are maintained as low as reasonably achievable (ALARA), (2) DOE's limiting values are not exceeded, (3) employees are aware of and are prepared to cope with emergency conditions, and (4) employees are not inadvertently exposed to radiation or radioactive material.

Radiological Control Managers' Council

2008-06-01T23:59:59.000Z

180

Geothermal energy in Nevada  

SciTech Connect (OSTI)

The nature of goethermal resources in Nevada and resource applications are discussed. The social and economic advantages of utilizing geothermal energy are outlined. Federal and State programs established to foster the development of geothermal energy are discussed. The names, addresses, and phone numbers of various organizations actively involved in research, regulation, and the development of geothermal energy are included. (MHR)

Not Available

1980-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993  

SciTech Connect (OSTI)

The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.

Not Available

1994-06-01T23:59:59.000Z

182

Corrective Action Plan for CAU No. 95: Area 15 EPA Farm Laboratory Building, Decontamination and Demolition Closure Activities - Nevada Test Site. Rev. 0  

SciTech Connect (OSTI)

This Corrective Action Plan (CAP) provides the selected corrective action alternative and proposes the closure implementation methodology for the Environmental Protection Agency (EPA) Farm Laboratory Building 15-06 located in Area 15 of the Nevada Test Site (NTS), Nye County, Nevada. The facility is part of the Environmental Restoration Project managed by the U.S. Department of Energy/Nevada Operations Office (DOE/NV) under the Decontamination and Decommissioning (D&D) Subproject which serves to manage and dispose of surplus facilities at the NTS in a manner that will protect personnel, the public, and the environment. It is identified as Corrective Action Unit (CAU) 95 in Appendix III of the Federal Facilities Agreement and Consent Order (FFACO). In July 1997, the DOE/NV verbally requested approval from the Nevada Division of Environmental Protection (NDEP) for the closure schedule to be accelerated. Currently, field activities are anticipated to be completed by September 30, 1997. In order to meet this new schedule NDEP has agreed to review this document as expeditiously as possible. Comments will be addressed in the Closure Report after field activities have been completed, unless significant issues require resolution during closure activities.

Olson, A.L.; Nacht, S.J.

1997-11-01T23:59:59.000Z

183

EIS-0413: Searchlight Wind Energy Project, Searchlight, NV  

Broader source: Energy.gov [DOE]

The Department of the Interior’s Bureau of Land Management, with DOE’s Western Area Power Administration as a cooperating agency, is preparing this EIS to evaluate the environmental impacts of a proposal to construct and operate 156 wind turbine generators and related facilities on public lands surrounding the town of Searchlight, Nevada. The proposal includes a substation that would be operated by Western.

184

Independent Oversight Activity Report, Nevada National Security...  

Office of Environmental Management (EM)

Report, Nevada National Security Site - March 3-6, 2014 March 2014 Operational Awareness Oversight of the Nevada National Security Site HIAR NNSS-2014-03-03 This...

185

Corrective Action Investigation Plan for Corrective Action Unit 511: Waste Dumps (Piles & Debris), Nevada Test Site, Nevada, Rev. No.: 0 with ROTC 1  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan for Corrective Action Unit 511: Waste Dumps (Piles & Debris), Nevada Test Site, Nevada, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada, U.S. Department of Energy, and the U.S. Department of Defense. The general purpose of the investigation is to ensure adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select viable corrective actions. This Corrective Action Investigation Plan provides investigative details for CAU 511, whereas programmatic aspects of this project are discussed in the ''Project Management Plan'' (DOE/NV, 1994). General field and laboratory quality assurance and quality control issues are presented in the ''Industrial Sites Quality Assurance Project Plan'' (NNSA/NV, 2002). Health and safety aspects of the project are documented in the current version of the Environmental Engineering Services Contractor's Health and Safety Plan and will be supplemented with a site-specific safety basis document. Corrective Action Unit 511 is comprised of the following nine corrective action sites in Nevada Test Site Areas 3, 4, 6, 7, 18, and 19: (1) 03-08-02, Waste Dump (Piles & Debris); (2) 03-99-11, Waste Dump (Piles); (3) 03-99-12, Waste Dump (Piles & Debris); (4) 04-99-04, Contaminated Trench/Berm; (5) 06-16-01, Waste Dump (Piles & Debris); (6) 06-17-02, Scattered Ordnance/Automatic Weapons Range; (7) 07-08-01, Contaminated Mound; (8) 18-99-10, Ammunition Dump; and (9) 19-19-03, Waste Dump (Piles & Debris). Corrective Action Sites 18-99-10 and 19-19-03 were identified after a review of the ''1992 RCRA Part B Permit Application for Waste Management Activities at the Nevada Test Site, Volume IV, Section L Potential Solid Waste Management Unit'' (DOE/NV, 1992). The remaining seven sites were first identified in the 1991 Reynolds Electrical & Engineering Co., Inc. document entitled, ''Nevada Test Site Inventory of Inactive and Abandoned Facilities and Waste Sites''. The seven-step data quality objectives (DQO) process was used to identify and define the type, quantity, and quality of data needed to complete the investigation phase of the corrective action process. The DQOs address the primary problem that sufficient information is not available to determine the appropriate corrective action for the CASs. Corrective action closure alternatives (i.e., no further action, close in place, or clean closure) will be recommended for CAU 511 based on an evaluation of all the DQO required data. Under the ''Federal Facility Agreement and Consent Order'', the Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval of the plan. The results of the field investigation will support a defensible evaluation of corrective action alternatives that will be presented in the Corrective Action Decision Document.

David A. Strand

2004-08-01T23:59:59.000Z

186

POST CLOSURE INSPECTION AND MONITORING REPORT FOR CORRECTIVE ACTION UNIT 417: CENTRAL NEVADA TEST AREA - SURFACE, HOT CREEK VALLEY, NEVADA, FOR CALENDAR YEAR 2004  

SciTech Connect (OSTI)

This post-closure inspection and monitoring report has been prepared according to the stipulations laid out in the Closure Report (CR) for Corrective Action Unit (CAU) 417, Central Nevada Test Area (CNTA)--Surface (U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office [NNSA/NV], 2001), and the Federal Facility Agreement and Consent Order (FFACO, 1996). This report provides an analysis and summary of site inspections, subsidence surveys, meteorological information, and soil moisture monitoring data for CAU 417, which is located in Hot Creek Valley, Nye County, Nevada. This report covers Calendar Year 2004. Inspections at CAU 417 are conducted quarterly to document the physical condition of the UC-1, UC-3, and UC-4 soil covers, monuments, signs, fencing, and use restricted areas. The physical condition of fencing, monuments, and signs is noted, and any unusual conditions that could impact the integrity of the covers are reported. The objective of the soil moisture monitoring program is to monitor the stability of soil moisture conditions within the upper 1.2 meters (m) (4 feet [ft]) of the UC-1 Central Mud Pit (CMP) cover and detect changes that may be indicative of moisture movement exceeding the cover design performance expectations.

BECHTEL NEVADA; NNSA NEVADA SITE OFFICE

2005-04-01T23:59:59.000Z

187

NEVADA UNIVERSITY TRANSPORTATION CENTER UNIVERSITY OF NEVADA, LAS VEGAS  

E-Print Network [OSTI]

NEVADA UNIVERSITY TRANSPORTATION CENTER UNIVERSITY OF NEVADA, LAS VEGAS 2011-2012 ANNUAL REPORT #12 University Transportation Center (NUTC) Vision: The NUTC will strive to become a nationally recognized center of excellence for research in planning, operations and management of sustainable transportation systems

Hemmers, Oliver

188

CBER-DETR Nevada Coincident and Leading Employment Storm Clouds Darkening Again on the Nevada Economy  

E-Print Network [OSTI]

Statistics. The Nevada Coincident Employment Index includes four employment measures ­ household employmentCBER-DETR Nevada Coincident and Leading Employment Indexes1 Storm Clouds Darkening Again on the Nevada Economy The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy

Ahmad, Sajjad

189

CBER-DETR Nevada Coincident and Leading Employment Slow Recovery in Nevada's Economy Continues  

E-Print Network [OSTI]

the seasonally adjusted data reported by the Bureau of Labor Statistics. The Nevada Coincident Employment IndexCBER-DETR Nevada Coincident and Leading Employment Indexes1 Slow Recovery in Nevada's Economy Continues The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using

Ahmad, Sajjad

190

CBER-DETR Nevada Coincident and Leading Employment The Nevada Recovery: Progress Continues  

E-Print Network [OSTI]

the seasonally adjusted data reported by the Bureau of Labor Statistics. The Nevada Coincident Employment IndexCBER-DETR Nevada Coincident and Leading Employment Indexes1 The Nevada Recovery: Progress Continues The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using an index

Ahmad, Sajjad

191

CBER-DETR Nevada Coincident and Leading Employment Weak National Recovery Lengthens Nevada's Employment Recession  

E-Print Network [OSTI]

Statistics. The Nevada Coincident Employment Index includes four employment measures ­ household employmentCBER-DETR Nevada Coincident and Leading Employment Indexes1 Weak National Recovery Lengthens Nevada's Employment Recession The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy

Ahmad, Sajjad

192

CBER-DETR Nevada Coincident and Leading Employment Did the Nevada Employment Recession End?  

E-Print Network [OSTI]

the seasonally adjusted data reported by the Bureau of Labor Statistics. The Nevada Coincident Employment IndexCBER-DETR Nevada Coincident and Leading Employment Indexes1 Did the Nevada Employment Recession End? Jury Still Out! The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy

Ahmad, Sajjad

193

CBER-DETR Nevada Coincident and Leading Employment Will 2011 Usher in a Recovery in Nevada?  

E-Print Network [OSTI]

the seasonally adjusted data reported by the Bureau of Labor Statistics. The Nevada Coincident Employment IndexCBER-DETR Nevada Coincident and Leading Employment Indexes1 Will 2011 Usher in a Recovery in Nevada? The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using an index

Ahmad, Sajjad

194

CBER-DETR Nevada Coincident and Leading Employment Benchmark Revisions Add Employment to Nevada  

E-Print Network [OSTI]

the seasonally adjusted data reported by the Bureau of Labor Statistics. The Nevada Coincident Employment IndexCBER-DETR Nevada Coincident and Leading Employment Indexes1 Benchmark Revisions Add Employment to Nevada The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using

Ahmad, Sajjad

195

CBER-DETR Nevada Coincident and Leading Employment Employment Recovery in Nevada Continues Its Slow Pace  

E-Print Network [OSTI]

by the Bureau of Labor Statistics. The Nevada Coincident Employment Index includes four employment measuresCBER-DETR Nevada Coincident and Leading Employment Indexes1 Employment Recovery in Nevada Continues Its Slow Pace The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy

Ahmad, Sajjad

196

CBER-DETR Nevada Coincident and Leading Employment Will Nevada Experience a Double Dip Recession?  

E-Print Network [OSTI]

the seasonally adjusted data reported by the Bureau of Labor Statistics. The Nevada Coincident Employment IndexCBER-DETR Nevada Coincident and Leading Employment Indexes1 Will Nevada Experience a Double Dip Recession? The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using

Ahmad, Sajjad

197

Community Environmental Monitoring Program (CEMP) Data related to Air, Soil, and Water Monitoring around the Nevada Test Site  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

The Community Environmental Monitoring Program (CEMP) is a network of 29 monitoring stations located in communities surrounding and downwind of the Nevada Test Site (NTS) that monitor the airborne environment for manmade radioactivity that could result from NTS activities. The network stations, located in Nevada, Utah, and California are comprised of instruments that collect a variety of environmental radiological and meteorological data. The emphasis of the CEMP is to monitor airborne radioactivity and weather conditions, and make the results available to the public. Instrumentation that records these data is connected to a datalogger, and real-time radiation levels or weather conditions can immediately and easily be seen on a display at each station. These data are transmitted via direct or wireless internet connection, landline or cellular phone, or satellite transmission to DRI's Western Regional Climate Center in Reno, Nevada, and are updated as frequently as every 10 minutes on the World Wide Web at http://www.cemp.dri.edu. DOE and DRI also publish the results of the monitoring program and distribute these reports throughout the network community. The reports provide summaries of average values for each station and the entire network, and show deviations from the expected range values. [Copied from the CEMP website (Introduction) at http://www.cemp.dri.edu/cemp/moreinfo.html

198

Nevada -- SEP Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Nevada -- SEP Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Nevada -- SEP. Nevada -- SEP Summary of...

199

Nevada's Noxious Weed Program Nevada Department of Agriculture  

E-Print Network [OSTI]

. Washoe) *Tahoe Basin Weed Coordinating Group Tri-County Weed Group *Truckee Meadows *Walker River Basin???? Education, education, education..... Schools, NV Assoc. of Counties, Parks & Rec., Weed Warriors Classes-2005 *Alpine County/Upper Carson Watershed *Carson City *Churchill County *Clark County *Elko County *Gerlach

Nowak, Robert S.

200

Structural Orientations Adjacent to Some Colorado Geothermal Systems  

SciTech Connect (OSTI)

Citation Information: Originator: Geothermal Development Associates, Reno, Nevada Publication Date: 2012 Title: Structural Data Edition: First Publication Information: Publication Place: Reno Nevada Publisher: Geothermal Development Associates, Reno, Nevada Description: Structural orientations (fractures, joints, faults, lineaments, bedding orientations, etc.) were collected with a standard Brunton compass during routine field examinations of geothermal phenomena in Colorado. Often multiple orientations were taken from one outcrop. Care was taken to ensure outcrops were "in place". Point data was collected with a hand-held GPS unit. The structural data is presented both as standard quadrant measurements and in format suitable for ESRI symbology Spatial Domain: Extent: Top: 4491528.924999 m Left: 207137.983196 m Right: 432462.310324 m Bottom: 4117211.772001 m Contact Information: Contact Organization: Geothermal Development Associates, Reno, Nevada Contact Person: Richard “Rick” Zehner Address: 3740 Barron Way City: Reno State: NV Postal Code: 89511 Country: USA Contact Telephone: 775-737-7806 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System 1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shape file

Richard,

2012-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Nevada Test Site Radiological Control Manual  

SciTech Connect (OSTI)

This document supersedes DOE/NV/11718--079, “NV/YMP Radiological Control Manual,” Revision 5 issued in November 2004. Brief Description of Revision: A complete revision to reflect the recent changes in compliance requirements with 10 CFR 835, and for use as a reference document for Tenant Organization Radiological Protection Programs.

Radiological Control Managers' Council - Nevada Test Site

2009-10-01T23:59:59.000Z

202

Nevada Test Site annual site environmental report for calendar year 1998  

SciTech Connect (OSTI)

Prior to 1989, annual reports of environmental monitoring and assessment results for the Nevada Test Site (NTS) were prepared in two separate parts. Onsite effluent monitoring and environmental monitoring results were reported in an onsite report prepared by the US Department of Energy, Nevada Operations Office (DOE/NV). Results of the Offsite Radiological Surveillance and Long-Term Hydrological Monitoring Programs conducted by the US Environmental Protection Agency's (EPA) Laboratory (various names) in Las Vegas, Nevada, were reported separately by that Agency. Beginning with the 1989 Annual Site Environmental Report for the NTS, these two documents were combined into a single report to provide a more comprehensive annual documentation of the environmental protection activities conducted for the nuclear testing program and other nuclear and non-nuclear operations at the NTS. The two agencies have coordinated preparation of this tenth combined onsite and offsite report through sharing of information on environmental surveillance and releases as well as meteorological, hydrological, and other supporting data used in dose-estimation calculations.

Black, S.C.; Townsend, Y.E.

1999-10-01T23:59:59.000Z

203

Nevada Test Site Annual Site Environmental Report for Calendar Year - 1999  

SciTech Connect (OSTI)

Prior to 1989, annual reports of environmental monitoring and assessment results for the Nevada Test Site (NTS) were prepared in two separate parts. Onsite effluent monitoring and environmental monitoring results were reported in an onsite report prepared by the U.S. Department of Energy, Nevada Operations Office (DOE/NV). Results of the Offsite Radiological Surveillance and Long-Term Hydrological Monitoring programs conducted by the U.S. Environmental Protection Agency's (EPA's) Laboratory (various names) in Las Vegas, Nevada, were reported separately by that Agency. Beginning with the 1989 Annual Site Environmental Report for the NTS, these two documents were combined into a single report to provide a more comprehensive annual documentation of the environmental protection activities conducted for the nuclear testing program and other nuclear and non-nuclear operations at the NTS. The two agencies have coordinated preparation of this eleventh combined onsite and offsite report through sharing of information on environmental surveillance and releases as well as meteorological, hydrological, and other supporting data used in dose-estimation calculations.

Townsend, Y.E.; Grossman, R.F.

2000-10-01T23:59:59.000Z

204

Title Five-Party Cooperative Agreement fy&AF, USDOI, BLM, State of Nevada & DOE/NV)  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Reviewwill help prepareA Review of TransuranicFive-Party

205

Corrective Action Decision Document/Corrective Action Plan for CAU 443: Central Nevada Test Area-Subsurface CNTA, NV  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou areDowntown Site -MiamiYVE r.x-L* d!9Document/

206

Nevada Transportatoion Options Study  

SciTech Connect (OSTI)

This study performs a cost and schedule analysis of three Nevada Transportation options that support waste receipt at the repository. Based on the U.S. Department of Energy preference for rail transportation in Nevada (given in the Final Environmental Impact Statement), it has been assumed that a branch rail line would be constructed to support waste receipt at the repository. However, due to potential funding constraints, it is uncertain when rail will be available. The three Nevada Transportation options have been developed to meet a varying degree of requirements for transportation and to provide cost variations used in meeting the funding constraints given in the Technical Direction Letter guidelines for this study. The options include combinations of legal-weight truck, heavy-haul truck, and rail. Option 1 uses a branch rail line that would support initial waste receipt at the repository in 2010. Rail transportation would be the primary mode, supplemented by legal weight trucks. This option provides the highest level of confidence in cost and schedule, lowest public visibility, greatest public acceptability, lowest public dose, and is the recommended option for support of waste receipt. The completion of rail by 2010 will require spending approximately $800 million prior to 2010. Option 2 uses a phased rail approach to address a constrained funding scenario. To meet funding constraints, Option 2 uses a phased approach to delay high cost activities (final design and construction) until after initial waste receipt in 2010. By doing this, approximately 95 percent of the cost associated with completion of a branch rail line is deferred until after 2010. To support waste receipt until a branch rail line is constructed in Nevada, additional legal-weight truck shipments and heavy-haul truck shipments (on a limited basis for naval spent nuclear fuel) would be used to meet the same initial waste receipt rates as in Option 1. Use of heavy-haul shipments in the absence of rail is restricted to approximately twelve, without upgrading public highways. There is high uncertainty as to what road upgrades and security/escorts the Nevada Department of Transportation would require to obtain an overweight/overdimensional permit. In addition, the Naval Nuclear Propulsion Program has indicated that a larger cask weight than that analyzed in the Final Environmental Impact Statement may be required for naval shipments, resulting in additional costs for heavy-haul transport. These uncertainties result in a high cost and schedule risk. Option 3 assumes that the start of rail construction will be delayed until after construction authorization is received from the Nuclear Regulatory Commission. Similar to Option 2, Option 3 uses legal-weight truck shipments and limited heavy haul truck shipments to meet the same initial waste receipt rates as Option 1, until rail becomes available. By using heavy-haul truck for two years, Option 3 contains the same uncertainties and resultant high cost and schedule risk as Option 2. The cost and schedule of legal-weight truck transport are not included in this report as that will be evaluated in the report on national transportation.

P. GEHNER; E.M. WEAVER; L. FOSSUM

2006-05-25T23:59:59.000Z

207

Nevada - SEP | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

with the city of Las Vegas to leverage its expertise in media and public relations to brand and organize public outreach efforts. EnergyFit Nevada officially launched on Earth...

208

Draft Nevada National Security Site Environmental Impact Statement...  

Office of Environmental Management (EM)

2011 - 12:00pm Addthis Media Contacts Darwin J. Morgan morgan@nv.doe.gov 702-295-3521 Kelly K. Snyder snyderk@nv.doe.gov 702-295-3521 The Draft Site-Wide Environmental Impact...

209

Binding of He{sub n}V clusters to ?-Fe grain boundaries  

SciTech Connect (OSTI)

The objective of this research is to explore the formation/binding energetics and length scales associated with the interaction between He{sub n}V clusters and grain boundaries in bcc ?-Fe. In this work, we calculated formation/binding energies for 1–8 He atoms in a monovacancy at all potential grain boundary (GB) sites within 15?Ĺ of the ten grain boundaries selected (122106 simulations total). The present results provide detailed information about the interaction energies and length scales of 1–8 He atoms with grain boundaries for the structures examined. A number of interesting new findings emerge from the present study. First, the ?3(112) “twin” GB has significantly lower binding energies for all He{sub n}V clusters than all other boundaries in this study. For all grain boundary sites, the effect of the local environment surrounding each site on the He{sub n}V formation and binding energies decreases with an increasing number of He atoms in the He{sub n}V cluster. Based on the calculated dataset, we formulated a model to capture the evolution of the formation and binding energy of He{sub n}V clusters as a function of distance from the GB center, utilizing only constants related to the maximum binding energy and the length scale.

Tschopp, M. A., E-mail: mark.a.tschopp.civ@mail.mil [U.S. Army Research Laboratory, Aberdeen Proving Ground, Maryland 21005 (United States); Gao, F. [Pacific Northwest National Laboratory, Richland, Washington 99352 (United States); Solanki, K. N. [Arizona State University, Tempe, Arizona 85287 (United States)

2014-06-21T23:59:59.000Z

210

Well Installation Report for Corrective Action Unit 443, Central Nevada Test Area, Nye County, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites, Corrective Action Unit 443'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first phase involved the gathering and interpretation of geologic and hydrogeologic data, and inputting the data into a three-dimensional numerical model to depict groundwater flow. The output from the groundwater flow model was used in a transport model to simulate the migration of a radionuclide release (Pohlmann et al., 2000). The second phase of modeling (known as a Data Decision Analysis [DDA]) occurred after NDEP reviewed the first model. This phase was designed to respond to concerns regarding model uncertainty (Pohll and Mihevc, 2000). The third phase of modeling updated the original flow and transport model to incorporate the uncertainty identified in the DDA, and focused the model domain on the region of interest to the transport predictions. This third phase culminated in the calculation of contaminant boundaries for the site (Pohll et al., 2003). Corrective action alternatives were evaluated and an alternative was submitted in the ''Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface'' (NNSA/NSO, 2004). Based on the results of this evaluation, the preferred alternative for CAU 443 is Proof-of-Concept and Monitoring with Institutional Controls. This alternative was judged to meet all requirements for the technical components evaluated and will control inadvertent exposure to contaminated groundwater at CAU 443.

Tim Echelard

2006-01-01T23:59:59.000Z

211

CBER-DETR Nevada Coincident and Leading Employment Did the Nevada Employment Recession End?  

E-Print Network [OSTI]

Statistics. The Nevada Coincident Employment Index includes four employment measures ­ household employmentCBER-DETR Nevada Coincident and Leading Employment Indexes1 Did the Nevada Employment Recession End? Coincident Index Moves Higher from October 2009 The Nevada Coincident Employment Index measures the ups

Ahmad, Sajjad

212

US Department of Energy Nevada Operations Office annual site environmental report: 1993. Volume 2: Appendices  

SciTech Connect (OSTI)

This report is comprised of appendices which support monitoring and surveillance on and around the Nevada Test Site (NTS) during 1993. Appendix A contains onsite Pu-238, gross beta, and gamma-emitting radionuclides in air. Appendix B contains onsite tritium in air. Appendix C contains onsite Pu-238, Sr-90, gross alpha and beta, gamma-emitting radionuclides, Ra-226, Ra-228 and tritium in water. A summary of 1993 results of offsite radiological monitoring is included in Appendix D. Appendix E contains radioactive noble gases in air onsite. Appendix F contains onsite thermoluminescent dosimeter data. Historical trends in onsite thermoluminescent dosimeter data are contained in Appendix G. Appendix H summarizes 1993 compliance at the DOE/NV NTS and non-NTS facilities. Appendix I summarizes the 1993 results of non radiological monitoring.

Black, S.C.; Glines, W.M.; Townsend, Y.E.

1994-09-01T23:59:59.000Z

213

CORRECTIVE ACTION DECISION DOCUMENT/CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 527: HORN SILVER MINE, NEVADA TEST SITE, NEVADA  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report (CADDKR) has been prepared for Corrective Action Unit (CAU) 527: Horn Silver Mine, Nevada Test Site (NTS), Nevada, in accordance with the Federal Facility Agreement and Consent Order (1996). Corrective Action Unit 527 is located within Area 26 of the NTS and consists of CAS 26-20-01, Contaminated Waste Dump No.1. This CADDKR refers to the site as CAU 527 or the Horn Silver Mine (HSM). This CADDKR provides or references the specific information necessary to support the closure of this CAU. Corrective action investigation activities were performed from November 12,2003 through January 21,2004. Additional sampling of liquid obtained from HSM-3 was conducted on May 3,2004. Corrective action investigation activities were performed as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 527 (NNSAiNV, 2002a). Assessment of the data generated from investigation activities identified the explosive nitrobenzene as a contaminant of concern (COC) on the floor of the 500-foot drift (HSM No.2). No other COCs were identified in the rock samples collected during the investigation activities. The air samples collected from borings HSM-1, HSM-2, and HSM-3 showed volatile organic compounds (primarily gasoline-related contaminants) to be present above the acceptable residential exposure criteria in the boreholes. A conservative modeling effort demonstrated that these concentrations would not migrate to the surface at concentrations that will present an unacceptable risk to future land users. However, other COCs are assumed to exist based on historical documentation on the types of waste placed in the shaft; therefore, the mine including the 300- and 500-foot drifts is considered to be contaminated above action levels. Current results of the field investigation show there are no active transport mechanisms or exposure routes for the contaminants identified in the 500-foot drift. The analytical data did not show the migration of COCs beyond the floor of the 500-foot drift or from the air within the drift. On a conservative basis, the subsurface volume of the zone of contamination is limited to a depth from 150 ft to a maximum of 670 feet below ground surface extending to a radius of 300 feet from the mineshaft. Based on these data, a use restriction will be established for this volume of soil. In addition, the security of the mineshaft is maintained and does not allow unauthorized personnel to enter the vicinity of the mineshaft. Since the removal of the contaminants is not feasible, the close in place with administrative controls corrective action alternative is appropriate because it will prevent inadvertent contact with the subsurface COCs and meets all applicable state and federal regulations for closure of the site. Post-closure monitoring will be conducted for one year. This monitoring will include using the lysimeter at HSM-3 and the data logger to measure precipitation-induced vadose zone moisture flow through the rock beneath the waste shaft at the Horn Silver Mine. Results of the monitoring will be documented in a letter report at the end of one year, anticipated in June 2005. A copy of this report will be submitted to the Nevada Division of Environmental Protection. After one year of monitoring, a determination will be made by the Nevada Division of Environmental Protection and U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office if future monitoring is needed or if use restriction boundaries need to be adjusted. If a large enough pulse of water moves into the lysimeter, a sample will he collected for laboratory analysis. If there is not sufficient volume of liquid collected for a sample or if no COCs are detected in collected samples at the end of this time period, it is recommended that the monitoring wells at the HSM be sealed in accordance with the State of Nevada regulations.

NONE

2004-08-01T23:59:59.000Z

214

DOE Nevada Operations Office Environmental Protection Implementation Plan, November 9, 1993--November 9, 1994  

SciTech Connect (OSTI)

DOE Order 5400.1, ``General Environmental Protection Program,`` established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter III of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Nevada Operations Office (DOE/NV) has prepared this fourth annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Environment, Safety, Security, & Health (AMESSH), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions.

Elle, D.R. [USDOE Nevada Operations Office, Las Vegas, NV (United States); Townsend, Y.E. [ed.; Latham, A.R.; Black, S.C. [Reynolds Electrical and Engineering Co., Inc., Las Vegas, NV (United States)

1993-11-01T23:59:59.000Z

215

Corrective Action Plan for Corrective Action Unit 230: Area 22 Sewage Lagoons and Corrective Action Unit 320: Area 22 Desert Rock Airport Strainer Box, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

The purpose of this Corrective Action Plan (CAP) is to provide the strategy and methodology to close the Area 22 Sewage Lagoons site. The CAU will be closed following state and federal regulations and the FFACO (1996). Site characterization was done during September 1999, Soil samples were collected using a direct-push method and a backhoe. Soil samples were collected from the sludge bed, sewage lagoons, strainer box, and Imhoff tank areas. Characterization of the manholes associated with the septic system leading to the Imhoff tank was done during March 2000. The results of the characterization were reported in the Corrective Action Decision Document (CADD) (DOE/NV, 2000). Soil sample results indicated that the only constituent of concern (COC) detected above Preliminary Action Levels (PALs) was total petroleum hydrocarbons (TPH) as diesel-range organics. This COC was detected in three samples from the sludge bed at concentrations up to 580 milligrams per kilogram (mg/kg). This exceeds the Nevada Division of Environmental Protection (NDEP) regulatory action level for TPH of 100 mg/kg (Nevada Administrative Code, 1996). Excavation of the area during characterization uncovered asphalt debris, four safety poles, and strands of barbed wire. The TPH-impacted soil and debris will be removed and disposed in the NTS Area 6 Hydrocarbon Landfill.

D. S. Tobiason

2000-09-01T23:59:59.000Z

216

Closure Report for Corrective Action Unit 230: Area 22 Sewage Lagoons and Corrective Action Unit 320: Area 22 Desert Rock Airport Strainer Box Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Closure Report (CR) describes the remediation activities performed and the results of verification sampling conducted at Corrective Action Unit (CAU) 230, Area 22 Sewage Lagoons and CAU 320, Area 22 Desert Rock Airport Strainer Box. The CAU is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO, 1996). The CAU is located in Area 22 of the Nevada Test Site (NTS) (Figure 1) and consists of the following Corrective Action Sites (CASs): 22-03-01- Sewage Lagoon (CAU 230); and 22-99-01- Strainer Box (CAU 320). Included with CAS 22-99-01 is a buried Imhoff tank and a sludge bed. These CAUs will be collectively referred to in this plan as the Area 22 Sewage Lagoons site. Site characterization activities were done during September 1999. Characterization of the manholes associated with the septic system leading to the Imhoff tank was done during March 2000. The results of the characterization presented in the Corrective Action Decision Document (CADD) indicated that only the sludge bed (CAS 22-99-01) contained constituents of concern (COC) above action levels and required remediation (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 2000a).

D. S. Tobiason

2001-07-01T23:59:59.000Z

217

Nevada Test Site Waste Acceptance Criteria (NTSWAC)  

SciTech Connect (OSTI)

This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive (LLW) and LLW Mixed Waste (MW) for disposal.

NNSA /NSO Waste Management Project

2008-06-01T23:59:59.000Z

218

Environmental overview of geothermal development: northern Nevada  

SciTech Connect (OSTI)

Regional environmental problems and issues associated with geothermal development in northern Nevada are studied to facilitate environmental assessment of potential geothermal resources. The various issues discussed are: environmental geology, seismicity of northern Nevada, hydrology and water quality, air quality, Nevada ecosystems, noise effects, socio-economic impacts, and cultural resources and archeological values. (MHR)

Slemmons, D.B.; Stroh, J.M.; Whitney, R.A. (eds.) [eds.

1980-08-01T23:59:59.000Z

219

Status of the flora and fauna on the Nevada Test Site, 1994: Results of continuing Basic Environmental Monitoring January through December 1994  

SciTech Connect (OSTI)

This is the final progress report of a Department of Energy (DOE), Nevada operations Office (NV), program to monitor the ecology of the Nevada Test Site (NTS). The eight-year Basic Environmental Compliance and Monitoring Program (BECAMP) included meeting goals of understanding the spatial and temporal changes of plants and animals on the NTS, and determining the effects of DOE operations on those plants and animals. Determination of the changes was addressed through monitoring the most common plant and animal species at undisturbed (baseline) plots located in the major NTS valleys and mesas. One plot in Yucca Flat, the site of most nuclear weapons tests, was monitored annually, while other baseline plots were censused on a three- or four-year cycle. Effects of DOE operations were examined at sites of major disturbances, related to both DOE operations and natural disturbance mechanisms, censused on a three-year cycle. This report concentrates on work completed in 1994.

Hunter, R.B. [comp.

1995-09-01T23:59:59.000Z

220

Shedding light on LMA-Dark solar neutrino solution by medium baseline reactor experiments: JUNO and RENO-50  

E-Print Network [OSTI]

In the presence of Non-Standard neutral current Interactions (NSI) a new solution to solar neutrino anomaly with $\\cos 2\\theta_{12}<0$ appears. We investigate how this solution can be tested by upcoming intermediate baseline reactor experiments, JUNO and RENO-50. We point out a degeneracy between the two solutions when both hierarchy and the $\\theta_{12}$ octant are flipped. We then comment on how this degeneracy can be partially lifted by long baseline experiments sensitive to matter effects such as the NOvA experiment.

Pouya Bakhti; Yasaman Farzan

2014-07-02T23:59:59.000Z

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Coherent interference effects in a nano-assembled diamond NV center  

E-Print Network [OSTI]

-Packard Laboratories, 1501 Page Mill Rd, Palo Alto, CA 94304, USA Presently with Hewlett-Packard Laboratories, 1501 Page Mill Rd, Palo Alto, CA 94304, USA paul.barclay@hp.com Abstract: Diamond nanocrystals containing NV, P. Olivero, A. D. Greentree, S. Prawer, F. Jelezko, and P. Hemmer, "Coherent Population Trapping

Painter, Oskar

222

CBER-DETR Nevada Coincident and Leading Employment Cloudy Skies Continue to Hang over the Nevada Employment Sector  

E-Print Network [OSTI]

the seasonally adjusted data reported by the Bureau of Labor Statistics. The Nevada Coincident Employment IndexCBER-DETR Nevada Coincident and Leading Employment Indexes1 Cloudy Skies Continue to Hang over the Nevada Employment Sector The Nevada Coincident Employment Index measures the ups and downs of the Nevada

Ahmad, Sajjad

223

CBER-DETR Nevada Coincident and Leading Employment Two Steps Forward and One Step Back: The Nevada Recovery  

E-Print Network [OSTI]

data reported by the Bureau of Labor Statistics. The Nevada Coincident Employment Index includes fourCBER-DETR Nevada Coincident and Leading Employment Indexes1 Two Steps Forward and One Step Back: The Nevada Recovery The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy

Ahmad, Sajjad

224

CBER-DETR Nevada Coincident and Leading Employment The Nevada Recovery Continues to Climb Out of Deep Hole  

E-Print Network [OSTI]

by the Bureau of Labor Statistics. The Nevada Coincident Employment Index includes four employment measuresCBER-DETR Nevada Coincident and Leading Employment Indexes1 The Nevada Recovery Continues to Climb Out of Deep Hole The Nevada Coincident Employment Index measures the ups and downs of the Nevada

Ahmad, Sajjad

225

44th AIAA Aerospace Sciences Meeting and Exhibit, January 912, 2006 Reno, Nevada Application of the Time Spectral Method to Periodic  

E-Print Network [OSTI]

-stator combinations in turbomachinery, wind turbine rotors and flapping wing propulsion systems. Wakes behind bluff

Jameson, Antony

226

AIAA Aerospace Sciences Meeting and Exhibit, 9-12, January 2006, Reno, Nevada American Institute of Aeronautics and Astronautics Paper 2006-0191  

E-Print Network [OSTI]

, VA 22030, USA Daniele Pelessone Engineering and Software System Solutions, Solana Beach, CA, 92075. To model the physics involved, elasto-plastic material models with rupture criteria (CSD) are required, a loose-coupled solver can be assembled with minimum modifications to either of the two solvers

Löhner, Rainald

227

American Institute of Aeronautics and Astronautics Paper 2006-0497 AIAA Aerospace Meeting and Exhibit, Reno, Nevada, 9-12 January 2006  

E-Print Network [OSTI]

in the turbulent flow regime is crucial to the efficient design of scramjet engines and hypersonic flight

MartĂ­n, Pino

228

43rd AIAA Aerospace Sciences Meeting and Exhibit, Jan 10Jan 13, Reno, Nevada Analysis of Shockwave/Turbulent Boundary Layer  

E-Print Network [OSTI]

, for example, in scramjet engines, where the turbulent flow inside the engine is characterized by complex shock

MartĂ­n, Pino

229

In-depth survey report: Control technology for small business: Evaluation of a flexible duct ventilation system for radiator repair, at A-1 Radiator, Reno, Nevada  

SciTech Connect (OSTI)

An engineering control evaluation was conducted at a radiator repair shop which operated at a very high level of production. The shop had the potential for high exposures to lead (7439921) because of the high volume of work, the number of radiator repair stations, and repairs to huge radiators for mining equipment. Local exhaust ventilation which utilized adjustable arm elephant trunk exhaust hoods had been installed 18 months prior to the visit. The objective of the study was to evaluate the effectiveness of the local exhaust ventilation (LEV) system to control lead exposures during work operations. Time weighted average personal exposures for lead were at or below the OSHA permissible exposure level for ten of 15 mechanics during a high level of production. The elephant trunk ventilation system was capable of controlling lead fumes while shop doors were open, except at one tank in a corner. Work practices were found to be a source of excessive lead exposure. Emissions from a worker's own soldering and from soldering activity upwind of the worker were a major source of lead exposure. Collapse of flexible portions of ducts could reduce exhaust volume. Dampers also showed a tendency to close automatically.

Sheehy, J.W.; Cooper, T.C.; Hall, R.M.; Meier, R.M.

1990-02-01T23:59:59.000Z

230

American Institute of Aeronautics and Astronautics Paper No.2006-0369 44th AIAA Aerospace Sciences Meeting and Exhibit, 9-12 Jan 2006, Reno, Nevada  

E-Print Network [OSTI]

Laboratory (CPDL) in Kettering University. A blow-down open loop wind tunnel with 1-foot by 1 foot test across a range of speed and altitude regimes. It has the advantages of rapid response, elimination of moving parts, low power draw, and due to its solid-state nature it may reduce drag considerably [1

Roy, Subrata

231

American Institute of Aeronautics and Astronautics Paper No.2005-0948 43rd AIAA Aerospace Sciences Meeting and Exhibit, 10-13 Jan 2005, Reno, Nevada  

E-Print Network [OSTI]

discharge characteristics including electron gas flooding at electrode, sheath heating, sheath evolution) and radio frequency (RF) driven discharges in many fields including material processing, microelectronics. Understanding RF induced sheath dynamics near the surface of an electrode has a strong effect on both volume

Roy, Subrata

232

42nd Aerospace Sciences Meeting, 6th Weakly Ionized Gases Workshop, Reno, Nevada 5 -8 Jan 2004 EFFECT OF DISCHARGE ENERGY AND CAVITY GEOMETRY ON FLAME  

E-Print Network [OSTI]

of internal combustion engines. Similar high-voltage nanosecond discharges 13-16 have been reported as a pote in a geometrically IC engine like combustion chamber at elevated pressure. Discharge efficiency of pulsed corona are also of interest for certain advanced combustion engines including pulse detonation 2-4 , high altitude

233

Enhanced Geothermal in Nevada: Extracting Heat From the Earth...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Enhanced Geothermal in Nevada: Extracting Heat From the Earth to Generate Sustainable Power Enhanced Geothermal in Nevada: Extracting Heat From the Earth to Generate Sustainable...

234

Independent Oversight Inspection, Nevada Test Site, Volume 2...  

Broader source: Energy.gov (indexed) [DOE]

Volume 2 - September 2004 Independent Oversight Inspection, Nevada Test Site, Volume 2 - September 2004 September 2004 Inspection of Emergency Management at the Nevada Test Site...

235

Geodetic Survey At Nevada Test And Training Range Area (Sabin...  

Open Energy Info (EERE)

Nevada Test And Training Range Area (Sabin, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geodetic Survey At Nevada Test And...

236

Geographic Information System At Nevada Test And Training Range...  

Open Energy Info (EERE)

Nevada Test And Training Range Area (Sabin, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geographic Information System At Nevada...

237

Geothermometry At Nevada Test And Training Range Area (Sabin...  

Open Energy Info (EERE)

Nevada Test And Training Range Area (Sabin, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermometry At Nevada Test And...

238

Modeling-Computer Simulations At Central Nevada Seismic Zone...  

Open Energy Info (EERE)

Modeling-Computer Simulations At Central Nevada Seismic Zone Region (Biasi, Et Al., 2009) Exploration Activity Details Location Central Nevada Seismic Zone Geothermal Region...

239

Nevada Deploys Grid-Connected Electricity from Enhanced Geothermal...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Nevada Deploys Grid-Connected Electricity from Enhanced Geothermal Systems Nevada Deploys Grid-Connected Electricity from Enhanced Geothermal Systems May 16, 2013 - 12:00am Addthis...

240

Nevada's Beowawe Geothermal Plant Begins Generating Clean Energy...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Nevada's Beowawe Geothermal Plant Begins Generating Clean Energy Nevada's Beowawe Geothermal Plant Begins Generating Clean Energy April 20, 2011 - 1:45pm Addthis U.S. Energy...

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Compound and Elemental Analysis At Central Nevada Seismic Zone...  

Open Energy Info (EERE)

Central Nevada Seismic Zone Region (Laney, 2005) Exploration Activity Details Location Central Nevada Seismic Zone Geothermal Region Exploration Technique Compound and Elemental...

242

Energy Literacy in Action: Nevada Teachers Helping Students Learn...  

Office of Environmental Management (EM)

Literacy in Action: Nevada Teachers Helping Students Learn About Energy Energy Literacy in Action: Nevada Teachers Helping Students Learn About Energy November 6, 2014 - 10:48am...

243

Corrective action decision document, Second Gas Station, Tonopah test range, Nevada (Corrective Action Unit No. 403)  

SciTech Connect (OSTI)

This Corrective Action Decision Document (CADD) for Second Gas Station (Corrective Action Unit [CAU] No. 403) has been developed for the U.S. Department of Energy`s (DOE) Nevada Environmental Restoration Project to meet the requirements of the Federal Facility Agreement and Consent Order (FFACO) of 1996 as stated in Appendix VI, {open_quotes}Corrective Action Strategy{close_quotes} (FFACO, 1996). The Second Gas Station Corrective Action Site (CAS) No. 03-02-004-0360 is the only CAS in CAU No. 403. The Second Gas Station CAS is located within Area 3 of the Tonopah Test Range (TTR), west of the Main Road at the location of former Underground Storage Tanks (USTs) and their associated fuel dispensary stations. The TTR is approximately 225 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air and approximately 56 km (35 mi) southeast of Tonopah, Nevada, by road. The TTR is bordered on the south, east, and west by the Nellis Air Force Range and on the north by sparsely populated public land administered by the Bureau of Land Management and the U.S. Forest Service. The Second Gas Station CAS was formerly known as the Underground Diesel Tank Site, Sandia Environmental Restoration Site Number 118. The gas station was in use from approximately 1965 to 1980. The USTs were originally thought to be located 11 meters (m) (36 feet [ft]) east of the Old Light Duty Shop, Building 0360, and consisted of one gasoline UST (southern tank) and one diesel UST (northern tank) (DOE/NV, 1996a). The two associated fuel dispensary stations were located northeast (diesel) and southeast (gasoline) of Building 0360 (CAU 423). Presently the site is used as a parking lot, Building 0360 is used for mechanical repairs of vehicles.

NONE

1997-11-01T23:59:59.000Z

244

J. Biomater. Sci. Polymer Edn, Vol. 19, No. 10, pp. 13631382 (2008) Koninklijke Brill NV, Leiden, 2008.  

E-Print Network [OSTI]

interpenetrating polymer network (IPN) coatings with varying moduli to test the hypothesis that lower moduliJ. Biomater. Sci. Polymer Edn, Vol. 19, No. 10, pp. 1363­1382 (2008) © Koninklijke Brill NV, Leiden

Saha, Krishanu

2008-01-01T23:59:59.000Z

245

Phase I Transport Model of Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada Test Site, Nye County, Nevada with Errata Sheet 1, 2, 3, Revision 1  

SciTech Connect (OSTI)

As prescribed in the Pahute Mesa Corrective Action Investigation Plan (CAIP) (DOE/NV, 1999) and Appendix VI of the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended February 2008), the ultimate goal of transport analysis is to develop stochastic predictions of a contaminant boundary at a specified level of uncertainty. However, because of the significant uncertainty of the model results, the primary goal of this report was modified through mutual agreement between the DOE and the State of Nevada to assess the primary model components that contribute to this uncertainty and to postpone defining the contaminant boundary until additional model refinement is completed. Therefore, the role of this analysis has been to understand the behavior of radionuclide migration in the Pahute Mesa (PM) Corrective Action Unit (CAU) model and to define, both qualitatively and quantitatively, the sensitivity of such behavior to (flow) model conceptualization and (flow and transport) parameterization.

Greg Ruskauff

2009-02-01T23:59:59.000Z

246

University of Nevada (UNLV): Las Vegas, Nevada (Data)  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

A partnership with the University of Nevada and U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to collect solar data to support future solar power generation in the United States. The measurement station monitors global horizontal, direct normal, and diffuse horizontal irradiance to define the amount of solar energy that hits this particular location. The solar measurement instrumentation is also accompanied by meteorological monitoring equipment to provide scientists with a complete picture of the solar power possibilities.

Stoffel, T.; Andreas, A.

247

Nevada Power: Clark Station; Las Vegas, Nevada (Data)  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

A partnership with the University of Nevada and U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to collect solar data to support future solar power generation in the United States. The measurement station monitors global horizontal, direct normal, and diffuse horizontal irradiance to define the amount of solar energy that hits this particular location. The solar measurement instrumentation is also accompanied by meteorological monitoring equipment to provide scientists with a complete picture of the solar power possibilities.

Stoffel, T.; Andreas, A.

248

EA-1849: Department of Energy Loan Guarantee to Ormat Nevada, Inc. for a Geothermal Power Facility in Nevada  

Broader source: Energy.gov [DOE]

Ormat Nevada Inc. (ORMAT), through its subsidiaries, proposes to construct and operate three geothermal power production facilities and associated power transmission lines in northern Nevada. The...

249

Independent Oversight Activity Report, Nevada National Security...  

Broader source: Energy.gov (indexed) [DOE]

to observe the Nevada National Security Site Field Office presentations for the Defense Nuclear Facilities Safety Board annual visit. The presentations included briefings on...

250

Independent Oversight Inspection, Nevada Test Site - September...  

Broader source: Energy.gov (indexed) [DOE]

Site - September 2004 Independent Oversight Inspection, Nevada Test Site - September 2004 September 2004 Security and Emergency Management Pilot Integrated Performance Tests at the...

251

Independent Oversight Review, Nevada National Security Site,...  

Broader source: Energy.gov (indexed) [DOE]

and Special Door Interlock systems at the Nevada National Security Site (NNSS) Device Assembly Facility (DAF). The NNSS DAF is operated by National Security Technologies, LLC...

252

Oversight Reports - Nevada National Security Site | Department...  

Broader source: Energy.gov (indexed) [DOE]

and National Security Technologies, LLC, Line Oversight and Contractor Assurance Systems Self-Assessment October 13, 2011 Independent Oversight Review, Nevada Site Office -...

253

NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA  

SciTech Connect (OSTI)

This document establishes the U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal. Mixed waste generated within the State of Nevada by NNSA/NSO activities is accepted for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Site for storage or disposal.

U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION, NEVADA SITE OFFICE

2005-07-01T23:59:59.000Z

254

Independent Activity Report, Nevada National Security Site -...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

at the Nevada National Security Site. The purpose of the activity was to observe Subcritical Experiment activities at the U1a Complex, discuss ongoing activities at the...

255

NORTHERN NEVADA GEOTHERMAL EXPLORATION STRATEGY ANALYSIS  

E-Print Network [OSTI]

School of Mines Nevada Geothermal Study: Report No. 4, Feb.J. , 1976, Assessing the geothermal resource base of the1977, Microseisms in geothermal Studies in Grass Valley,

Goldstein, N.E.

2011-01-01T23:59:59.000Z

256

Nevada 2010: Dependency, Denial and Disaster  

E-Print Network [OSTI]

and Glen Atkinson, editors, Beal, M. Kimberly, LindsayNevada leaned Republican (Beal et al. , Whether Republicanconservative on social issues (Beal et al. , 1997). At the

Morin, Robert P

2011-01-01T23:59:59.000Z

257

Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 25-25-09, Spill H940825C (from UST 25-3101-1) • 25-25-14, Spill H940314E (from UST 25-3102-3) • 25-25-15, Spill H941020E (from UST 25-3152-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

Grant Evenson

2009-05-01T23:59:59.000Z

258

Addendum 2 to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 12-25-08, Spill H950524F (from UST 12-B-1) • 12-25-10, Spill H950919A (from UST 12-COMM-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

Grant Evenson

2009-05-01T23:59:59.000Z

259

Addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada, Revision 1  

SciTech Connect (OSTI)

This document constitutes an addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada (Revision 1), December 2002 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 06-25-01, CP-1 Heating Oil Release. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.

Grant Evenson

2009-05-01T23:59:59.000Z

260

Addendum 2 to the Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits, Nevada Test Site, Nevada, Revison 0  

SciTech Connect (OSTI)

This document constitutes an addendum to the Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits, Nevada Test Site, Nevada, January 2004 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 19-09-05, Mud Pit. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.

Grant Evenson

2009-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Corrective Action Investigation Plan for Corrective Action Unit 98: Frenchman Flat, Nevada Test Site, Nevada (Revision 1)  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) has been developed for Frenchman Flat Corrective Action Unit (CAU) 98. The Frenchman Flat CAU is located along the eastern border of the Nevada Test Site (NTS) and includes portions of Areas 5 and 11. The Frenchman Flat CAU constitutes one of several areas of the Nevada Test Site used for underground nuclear testing in the past. The nuclear tests resulted in groundwater contamination in the vicinity as well as downgradient of the underground test areas. The CAIP describes the Corrective Action Investigation (CAI) to be conducted at the Frenchman Flat CAU to evaluate the extent of contamination in groundwater due to the underground nuclear testing. The Frenchman Flat CAI will be conducted by the Underground Test Area (UGTA) Project which is a part of the U.S. Department of Energy, Nevada Operations Office (DOE/NV) Environmental Restoration Project. The CAIP is a requirement of the Federal Facility Agreement and Consent Order (FFACO) (1996 ) agreed to by the U.S. Department of Energy (DOE), the Nevada Division of Environmental Protection (NDEP), and the U.S. Department of Defense (DoD). Based on the general definition of a CAI from Section IV.14 of the FFACO, the purpose of the CAI is ''...to gather data sufficient to characterize the nature, extent, and rate of migration or potential rate of migration from releases or discharges of pollutants or contaminants and/or potential releases or discharges from corrective action units identified at the facilities...'' (FFACO, 1996). However, for the Underground Test Area (UGTA) CAUs, ''...the objective of the CAI process is to define boundaries around each UGTA CAU that establish areas that contain water that may be unsafe for domestic and municipal use.'', as stated in Appendix VI of the FFACO (1996). According to the UGTA strategy (Appendix VI of the FFACO), the CAI of a given CAU starts with the evaluation of the existing data. New data collection activities are generally contingent upon the results of the modeling and may or may not be part of the CAI. Such is the case for the Frenchman Flat CAU. The current scope of the Frenchman Flat CAI includes the development and use of a three-dimensional (3-D), numerical, CAU-scale groundwater flow and contaminant transport model to predict the location of the contaminant boundary. The CAU model will be developed and used to predict the location of the contaminant boundary. The scope of this CAI does not currently include any characterization activities; however, such activities will be conducted if the CAU model results indicate that further characterization information is needed to develop a sufficiently reliable CAU model. Two areas of importance to the CAU model are the model area and the investigation area. The CAU-model area will be selected to encompass the Frenchman Flat CAU and the region located immediately downgradient where contamination may migrate. The extent of the CAU-model area is dependent on the extent of contamination and is uncertain at this point. The extent of the investigation area is not expected to increase during the CAI.

USDOE/NV

1999-07-01T23:59:59.000Z

262

Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Closure Report (CR) documents the activities undertaken to close Corrective Action Unit (CAU) 326, Areas 6 and 27 Release Sites, in accordance with the Federal Facility Agreement and Consent Order (FFACO) of 1996. Site closure was performed in accordance with the Nevada Division of Environmental Protection (NDEP)-approved Streamlined Approach for Environmental Restoration Plan (SAFER) Plan for CAU 326 (US Department of Energy, Nevada Operations Office [DOE/NV, 2001]). CAU 326 consists of four Corrective Action Sites (CASs), 06-25-01, 06-25-02, 06-25-04, and 27-25-01. CAS 06-25-01 is a release site associated with an underground pipeline that carried heating oil from the heating oil underground storage tank (UST), Tank 6-CP-1, located to the west of Building CP-70 to the boiler in Building CP-1 located in the Area 6 Control Point (CP) compound. This site was closed in place administratively by implementing use restrictions. CAS 06-25-02 is a hydrocarbon release associated with an active heating oil UST, Tank 6-DAF-5, located west of Building 500 at the Area 6 Device Assembly Facility. This site was closed in place administratively by implementing use restrictions. CAS 06-25-04 was a hydrocarbon release associated with Tank 6-619-4. This site was successfully remediated when Tank 6-619-4 was removed. No further action was taken at this site. CAS 27-25-01 is an excavation that was created in an attempt to remove hydrocarbon-impacted soil from the Site Maintenance Yard in Area 27. Approximately 53 cubic meters (m{sup 3}) (70 cubic yards [yd{sup 3}]) of soil impacted by total petroleum hydrocarbons (TPH) and polychlorinated biphenyls (PCBs) was excavated from the site in August of 1994. Clean closure of this site was completed in 2002 by the excavation and disposal of approximately 160 m{sup 3} (210 yd{sup 3}) of PCB-impacted soil.

K. B. Campbell

2002-12-01T23:59:59.000Z

263

Corrective Action Decision Document/Closure Report for Corrective Action Unit 409: Other Waste Sites, Tonopah Test Range, Nevada (Rev. No.: 0, June 2001)  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 409: Other Waste Sites, Tonopah Test Range (TTR), Nevada, in accordance with the Federal Facility Agreement and Consent Order. Located near Area 3 on the TTR approximately 140 miles northwest of Las Vegas, Nevada, CAU 409 is comprised of three Corrective Action Sites (CASs): CAS RG-24-001-RGCR, Battery Dump Site; CAS TA-53-001-TAB2, Septic Sludge Disposal Pit (referred to as Septic Sludge Disposal Pit No.1); CAS TA-53-002-TAB2, Septic Sludge Disposal Pit (referred to as Septic Sludge Disposal Pit No.2). This CADD/CR identifies and rationalizes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office's (NNSA/NV's) recommendation that no corrective action is deemed necessary for CAU 409. The CADD/CR have been combined into one report based on sample data collected during the field investigation performed in November 2000. Analysis of the data generated from these investigation activities indicates preliminary action levels were not exceeded for total volatile organic compounds, Toxicity Characteristic Leaching Procedure (TCLP) volatile organic compounds, total semivolatile organic compounds, TCLP semivolatile organic compounds, total Resource Conservation and Recovery Act (RCRA) metals (except arsenic), TCLP RCRA metals, polychlorinated biphenyls, total petroleum hydrocarbons as gasoline- and diesel-range organics, isotopic uranium, and gamma-emitting radionuclides (except thorium-234) for any of the soil samples collected. Concentrations of arsenic were detected above the preliminary action level in all samples; however, the concentrations are considered representative of ambient conditions at the site. Thorium-234 was tentatively identified in one sample; however, the concentration is considered no greater than background. The NNSA/NV's final determination is that CAU 409 shows no evidence of soil contamination at any of the associated CASs; therefore, the recommendation for no corrective action is justified.

DOE /NV

2001-06-12T23:59:59.000Z

264

E-Print Network 3.0 - administration nevada site Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary: National Security Site (formerly the Nevada Test Site). This effort will bring NSTec nuclear physicists... Nevada Test Site, now called the Nevada National Security Site,...

265

COMMENT BY ESMERALDA COUNTY, NEVADA RE PRICE-ANDERSON ACT | Department...  

Office of Environmental Management (EM)

COMMENT BY ESMERALDA COUNTY, NEVADA RE PRICE-ANDERSON ACT COMMENT BY ESMERALDA COUNTY, NEVADA RE PRICE-ANDERSON ACT COMMENT BY ESMERALDA COUNTY, NEVADA CONCERNING THE CONTINUATION...

266

Nevada National Security Site Environmental Report Summary 2010  

SciTech Connect (OSTI)

This document summarizes the data reported in the Nevada National Security Site Environmental Report 2010.

C. Wills, ed.

2011-09-13T23:59:59.000Z

267

Nevada Test Site Environmental Report 2004  

SciTech Connect (OSTI)

The ''Nevada Test Site Environmental Report 2004'' was prepared by Bechtel Nevada (BN) to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. This Executive Summary presents the purpose of the document, the major programs conducted at the Nevada Test Site (NTS), NTS key environmental initiatives, radiological releases and potential doses to the public resulting from site operations, a summary of non-radiological releases, implementation status of the NTS Environmental Management System, and significant environmental accomplishments. Much of the content of this Executive Summary is also presented in a separate stand-alone pamphlet titled ''Nevada Test Site Environmental Report Summary 2004''. It was produced this year to provide a more cost-effective and wider distribution of a hardcopy summary of the ''Nevada Test Site Environmental Report 2004'' to interested DOE stakeholders.

BECHTEL NEVADA

2005-10-01T23:59:59.000Z

268

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort, the U.S. Department of Energy (DOE) determined that the degree of uncertainty in transport predictions for PSA remained unacceptably large. As a result, a second CAIP was developed by DOE and approved by the Nevada Division of Environmental Protection (NDEP) in December 1998 (DOE/NV, 1998a). This plan prescribed a rigorous analysis of uncertainty in the Shoal model and quantification of methods of reducing uncertainty through data collection. This analysis is termed a Data Decision Analysis (Pohll et al., 1999a) and formed the basis for a second major characterization effort at PSA (Pohll et al., 1999b). The details for this second field effort are presented in an Addendum to the CAIP, which was approved by NDEP in April 1999 (DOE/NV, 1999a). Four additional characterization wells were drilled at PSA during summer and fall of 1999; details of the drilling and well installation are in IT Corporation (2000), with testing reported in Mihevc et al. (2000). A key component of the second field program was a tracer test between two of the new wells (Carroll et al., 2000; Reimus et al., 2003). Based on the potential exposure pathways, two corrective action objectives were identified for CAU 447: Prevent or mitigate exposure to groundwater contaminants of concern at concentrations exceeding regulatory maximum contaminant levels or risk-based levels; and Reduce the risk to human health and the environment to the extent practicable. Based on the review of existing data, the results of the modeling, future use, and current operations at PSA, the following alternatives have been developed for consideration at CAU 447: Alternative 1--No Further Action; Alternative 2--Proof-of-Concept and Monitoring with Institutional Controls; and Alternative 3--Contaminant Control. The corrective action alternatives were evaluated based on the approach outlined in the ''Focused Evaluation of Selected Remedial Alternatives for the Underground Test Area'' (DOE/NV, 1998b). Each alternative was assessed against nine evaluation criteria. These criteria include overall protection of human health and the environment;

Tim Echelard

2006-03-01T23:59:59.000Z

269

CBER-DETR Nevada Coincident and Leading Employment Darkest before the Dawn? Nevada's Great Employment Recession Continues  

E-Print Network [OSTI]

Statistics. The Nevada Coincident Employment Index includes four employment measures ­ household employmentCBER-DETR Nevada Coincident and Leading Employment Indexes1 Darkest before the Dawn? Nevada's Great Employment Recession Continues The Nevada Coincident Employment Index measures the ups and downs

Ahmad, Sajjad

270

Recovery Act State Memos Nevada  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L dDepartment ofList?Department09 SectionGeorgiaMichiganMontanaNevada

271

Post-Closure Inspection and Monitoring Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Hot Creek Valley, Nevada  

SciTech Connect (OSTI)

This report presents results of data collected during the annual post-closure site inspections conducted at the Central Nevada Test Area surface Corrective Action Unit (CAU) 417 in May 2011 and July 2012. The annual post-closure site inspections included inspections of the UC-1, UC-3, and UC-4 sites in accordance with the Post-Closure Monitoring Plan provided in the CAU 417 Closure Report (NNSA/NV 2001). The annual inspections conducted at the UC-1 Central Mud Pit (CMP) indicated that the site and soil cover were in good condition. No new fractures or extension of existing fractures were observed and no issues with the fence or gate were identified. The vegetation on the cover continues to look healthy, but the biennial vegetation survey conducted during the 2012 inspection indicated that the total foliar cover was slightly higher in 2009 than in 2012. This may be indicative of a decrease in precipitation observed during the 2-year monitoring period. The precipitation totaled 9.9 inches from July 1, 2010, through June 30, 2011, and 5 inches from July 1, 2011, through June 30, 2012. This decrease in precipitation is also evident in the soil moisture data obtained from the time domain reflectometry sensors. Soil moisture content data show that the UC-1 cover is performing as designed, and evapotranspiration is effectively removing water from the cover.

None

2013-03-01T23:59:59.000Z

272

Title The Seismicity of NV and Some Adjacent Parts of the Great Basin Geologic Hazards  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Reviewwill help prepareA Review ofGeographictoSeismicity of NV

273

Post-Closure Monitoring Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Discharge Area Nevada Test Site, Nevada  

SciTech Connect (OSTI)

The Area 12 Fleet Operations Steam Cleaning site is located in the southeast portion of the Area 12 Camp at the Nevada Test Site (Figure 1). This site is identified in the Federal Facility Agreement and Consent Order (FFACO, 1996) as Corrective Action Site (CAS) 12-19-01 and is the only CAS assigned to Corrective Action Unit (CAU) 339. Post-closure sampling and inspection of the site were completed on March 23, 2001. Because of questionable representativeness and precision of the results, the site was resampled on June 12, 2001. Post-closure monitoring activities were scheduled biennially (every two years) in the Post-Closure Monitoring Plan provided in the December 1997 Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Discharge Area, Nevada Test Site (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1997). If after six years the rate of degradation appears to be so slow that the greatest concentration of total petroleum hydrocarbons (TPH) present at the site would not decay within 30 years of the site closure, the site will be reevaluated with consideration to enriching the impacted soil at the site to enhance the degradation process. A baseline for the site was established by sampling in 1997. Based on the recommendations from the 1999 post-closure monitoring report, samples were collected in 2000, earlier than originally proposed, because the 1999 sample results did not provide the expected decrease in TPH concentrations at the site. Sampling results from 2000 revealed favorable conditions for natural degradation at the CAU 339 site, but because of differing sample methods and heterogeneity of the soil, the data results from 2000 were not directly correlated with previous results. Post-closure monitoring activities for 2001 consisted of the following: Soil sample collection from three undisturbed plots (Plots A, B, and C, Figure 2); Sample analysis for TPH as oil and bio-characterization parameters (Comparative Enumeration Assay [CEA] and Standard Nutrient Panel [SNP]); Site inspection to evaluate the condition of the fencing and signs; and Preparation and submittal of the Post-Closure Monitoring Report.

A. T. Urbon

2001-08-01T23:59:59.000Z

274

Deep Resistivity Structure of Yucca Flat, Nevada Test Site, Nevada.  

SciTech Connect (OSTI)

The Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) at their Nevada Site Office are addressing groundwater contamination resulting from historical underground nuclear testing through the Environmental Management program and, in particular, the Underground Test Area project. One issue of concern is the nature of the somewhat poorly constrained pre Tertiary geology and its effects on ground-water flow in the area adjacent to a nuclear test. Ground water modelers would like to know more about the hydrostratigraphy and geologic structure to support a hydrostratigraphic framework model that is under development for the Yucca Flat Corrective Action Unit (CAU). During 2003, the U.S. Geological Survey, supported by the DOE and NNSA-NSO, collected and processed data from 51 magnetotelluric (MT) and audio-magnetotelluric (AMT) stations at the Nevada Test Site in and near Yucca Flat to assist in characterizing the pre-Tertiary geology in that area. The primary purpose was to refine the character, thickness, and lateral extent of pre Tertiary confining units. In particular, a major goal has been to define the upper clastic confining unit (late Devonian – Mississippian-age siliciclastic rocks assigned to the Eleana Formation and Chainman Shale) in the Yucca Flat area. The MT and AMT data have been released in separate USGS Open File Reports. The Nevada Test Site magnetotelluric data interpretation presented in this report includes the results of detailed two-dimensional (2 D) resistivity modeling for each profile (including alternative interpretations) and gross inferences on the three dimensional (3 D) character of the geology beneath each station. The character, thickness, and lateral extent of the Chainman Shale and Eleana Formation that comprise the Upper Clastic Confining Unit are generally well determined in the upper 5 km. Inferences can be made regarding the presence of the Lower Clastic Confining Unit at depths below 5 km. Large fault structures such as the CP Thrust fault, the Carpetbag fault, and the Yucca fault that cross Yucca Flat are also discernable as are other smaller faults. The subsurface electrical resistivity distribution and inferred geologic structures determined by this investigation should help constrain the hydrostratigraphic framework model that is under development.

Theodore H. Asch, Brian D. Rodriguez; Jay A. Sampson; Erin L. Wallin; and Jackie M. Williams.

2006-09-18T23:59:59.000Z

275

Favorable Geochemistry from Springs and Wells in COlorado  

SciTech Connect (OSTI)

Citation Information: Originator: Geothermal Development Associates, Reno Nevada Originator: United States Geological Survey (USGS) Originator: Colorado Geological Survey Publication Date: 2012 Title: Favorable Geochemistry Edition: First Publication Information: Publication Place: Reno Nevada Publisher: Geothermal Development Associates, Reno, Nevada Description: This layer contains favorable geochemistry for high-temperature geothermal systems, as interpreted by Richard "Rick" Zehner. The data is compiled from the data obtained from the USGS. The original data set combines 15,622 samples collected in the State of Colorado from several sources including 1) the original Geotherm geochemical database, 2) USGS NWIS (National Water Information System), 3) Colorado Geological Survey geothermal sample data, and 4) original samples collected by R. Zehner at various sites during the 2011 field season. These samples are also available in a separate shapefile FlintWaterSamples.shp. Data from all samples were reportedly collected using standard water sampling protocols (filtering through 0.45 micron filter, etc.) Sample information was standardized to ppm (micrograms/liter) in spreadsheet columns. Commonly-used cation and silica geothermometer temperature estimates are included. Spatial Domain: Extent: Top: 4515595.841032 m Left: 149699.513964 m Right: 757959.309388 m Bottom: 4104156.435530 m Contact Information: Contact Organization: Geothermal Development Associates, Reno, Nevada Contact Person: Richard “Rick” Zehner Address: 3740 Barron Way City: Reno State: NV Postal Code: 89511 Country: USA Contact Telephone: 775-737-7806 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System 1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shape file

Zehner, Richard E.

2012-02-01T23:59:59.000Z

276

NV Energy Large-Scale Photovoltaic Integration Study: Intra-Hour Dispatch and AGC Simulation  

SciTech Connect (OSTI)

The uncertainty and variability with photovoltaic (PV) generation make it very challenging to balance power system generation and load, especially under high penetration cases. Higher reserve requirements and more cycling of conventional generators are generally anticipated for large-scale PV integration. However, whether the existing generation fleet is flexible enough to handle the variations and how well the system can maintain its control performance are difficult to predict. The goal of this project is to develop a software program that can perform intra-hour dispatch and automatic generation control (AGC) simulation, by which the balancing operations of a system can be simulated to answer the questions posed above. The simulator, named Electric System Intra-Hour Operation Simulator (ESIOS), uses the NV Energy southern system as a study case, and models the system’s generator configurations, AGC functions, and operator actions to balance system generation and load. Actual dispatch of AGC generators and control performance under various PV penetration levels can be predicted by running ESIOS. With data about the load, generation, and generator characteristics, ESIOS can perform similar simulations and assess variable generation integration impacts for other systems as well. This report describes the design of the simulator and presents the study results showing the PV impacts on NV Energy real-time operations.

Lu, Shuai; Etingov, Pavel V.; Meng, Da; Guo, Xinxin; Jin, Chunlian; Samaan, Nader A.

2013-01-02T23:59:59.000Z

277

Local and bulk 13C hyperpolarization in NV-centered diamonds at variable fields and orientations  

E-Print Network [OSTI]

Polarizing nuclear spins is of fundamental importance in biology, chemistry and physics. Methods for hyperpolarizing 13C nuclei from free electrons in bulk, usually demand operation at cryogenic temperatures. Room-temperature approaches targeting diamonds with nitrogen-vacancy (NV) centers could alleviate this need, but hitherto proposed strategies lack generality as they demand stringent conditions on the strength and/or alignment of the magnetic field. We report here an approach for achieving efficient electron->13C spin alignment transfers, compatible with a broad range of magnetic field strengths and field orientations with respect to the diamond crystal. This versatility results from combining coherent microwave- and incoherent laser-induced transitions between selected energy states of the coupled electron-nuclear spin manifold. 13C-detected Nuclear Magnetic Resonance (NMR) experiments demonstrate that this hyperpolarization can be transferred via first-shell or via distant 13Cs, throughout the nuclear bulk ensemble. This method opens new perspectives for applications of diamond NV centers in NMR, and in quantum information processing.

Gonzalo A. Alvarez; Christian O. Bretschneider; Ran Fischer; Paz London; Hisao Kanda; Shinobu Onoda; Junichi Isoya; David Gershoni; Lucio Frydman

2014-12-30T23:59:59.000Z

278

Uncertainties associated with the definition of a hydrologic source term for the Nevada Test Site  

SciTech Connect (OSTI)

The U.S. Department of Energy, Nevada Operations Office (DOE/NV) Environmental Restoration Division is seeking to evaluate groundwater contamination resulting from 30 years of underground nuclear testing at the Nevada Test Site (NTS). This evaluation requires knowledge about what radioactive materials are in the groundwater and how they are transported through the underground environment. This information coupled with models of groundwater flow (flow paths and flow rates) will enable predictions of the arrival of each radionuclide at a selected receptor site. Risk assessment models will then be used to calculate the expected environmental and human doses. The accuracy of our predictions depends on the validity of our hydrologic and risk assessment models and on the quality of the data for radionuclide concentrations in ground water at each underground nuclear test site. This paper summarizes what we currently know about radioactive material in NTS groundwater and suggests how we can best use our limited knowledge to proceed with initial modeling efforts. The amount of a radionuclide available for transport in groundwater at the site of an underground nuclear test is called the hydrologic source term. The radiologic source term is the total amount of residual radionuclides remaining after an underground nuclear test. The hydrologic source term is smaller than the radiologic source term because some or most of the radionuclide residual cannot be transported by groundwater. The radiologic source term has been determined for each of the underground nuclear tests fired at the NTS; however, the hydrologic source term has been estimated from measurements at only a few sites.

Smith, D.K.; Esser, B.K. [Lawrence Livermore National Lab., CA (United States); Thompson, J.L. [Los Alamos National Lab., NM (United States)

1995-05-01T23:59:59.000Z

279

Nevada National Security Site Performance Assessment Updates...  

Office of Environmental Management (EM)

December 11 and 12, 2014 To view all the P&RA CoP 2014 Technical Exchange Meeting videos click here. Video Presentation Nevada National Security Site Performance Assessment...

280

Nevada Test Site Environmental Report 2003  

SciTech Connect (OSTI)

The Nevada Test Site Environmental Report 2003 was prepared by Bechtel Nevada to meet the requirements and guidelines of the U.S. Department of Energy and the information needs of the public. This report is meant to be useful to members of the public, public officials, regulators, and Nevada Test Site contractors. The Executive Summary strives to present in a concise format the purpose of the document, the NTS mission and major programs, a summary of radiological releases and doses to the public resulting from site operations, a summary of non-radiological releases, and an overview of the Nevada Test Site Environmental Management System. The Executive Summary, combined with the following Compliance Summary, are written to meet all the objectives of the report and to be stand-alone sections for those who choose not to read the entire document.

Bechtel Nevada

2004-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

PORE-WATER ISOTOPIC COMPOSITION AND UNSATURATED-ZONE FLOW, YUCCA MOUNTAIN, NEVADA  

SciTech Connect (OSTI)

Site characterization at Yucca Mountain, Nevada, the site of a potential high-level radioactive waste repository, has included studies of recharge, flow paths, percolation flux, perched water bodies, and chemical compositions of the water in the thick unsaturated zone (UZ). Samples of pore water from cores of two recently drilled boreholes, USW SD-6 near the ridge top of Yucca Mountain and USW WT-24 north of Yucca mountain, were analyzed for isotopic compositions as part of a study by the US Geological Survey (USGS), in cooperation with the US Department of Energy, under Interagency Agreement DE-AI08-97NV12033. The purpose of this report is to interpret {sup 14}C, {delta}{sup 13}C, {sup 3}H, {delta}D and {delta}{sup 18}O isotopic compositions of pore water from the core of boreholes USW SD-6 and USW WT-24 in relation to sources of recharge and flow paths in the UZ at Yucca Mountain. Borehole designation USW SD-6 and USW WT-24 subsequently will be referred to as SD-6 and WT-24. The sources of recharge and flow paths are important parameters that can be used in a UZ flow model, total system performance assessment (TSPA), and the license application (LA) for the potential repository at Yucca Mountain.

C. Yang

2000-10-23T23:59:59.000Z

282

Preliminary survey of tuff distribution in Esmeralda, Nye, and Lincoln Counties, Nevada  

SciTech Connect (OSTI)

This report inventories the surface distribution of silicic tuffs in Nye, Esmeralda, and Lincoln Counties, NV, based on a review of available literature. The inventory was taken to provide a data base in evaluating tuff sites for the disposal of high-level nuclear waste. Silicic ash-flow tuffs that are about 11 to 34 million years (my) old are widespread in these counties. These rocks are locally deformed by right-lateral movement along Walker Lane and the Las Vegas Shear Zone, and left-lateral movement along a zone from near the Nevada Test Site (NTS) to the Utah border, and are commonly offset by steeply dipping normal faults. The normal faults that bound horsts, grabens, and tilted-fault blocks of the Basin-and-Range Province began to form 30 my ago; some are still active. Tuff distribution is discussed on a regional basis. Tuff thicknesses and alterations, structural complexity, and proximity to recent faulting, recent volcanism, and mineral resources are discussed for each area. Although the literature on which it is based is often incomplete and sketchy, this report is intended to serve as a basis for future, more detailed work that includes initial field inspection, detailed field and laboratory studies, and extrapolations to the subsurface.

Smith, G.V.; Pink, T.S.; Lawrence, J.R.; Woodward, L.A.; Keil, K.; Lappin, A.R.

1981-02-01T23:59:59.000Z

283

EnergyFit Nevada (formerly known as the Nevada Retrofit Initiative) final report and technical evaluation  

SciTech Connect (OSTI)

The EnergyFit Nevada (EFN) Better Buildings Neighborhood Program (BBNP, and referred to in this document as the EFN program) currently encourages Nevada residents to make whole-house energy-efficient improvements by providing rebates, financing, and access to a network of qualified home improvement contractors. The BBNP funding, consisting of 34 Energy Efficiency Conservation Block Grants (EECBG) and seven State Energy Program (SEP) grants, was awarded for a three-year period to the State of Nevada in 2010 and used for initial program design and implementation. By the end of first quarter in 2014, the program had achieved upgrades in 553 homes, with an average energy reduction of 32% per home. Other achievements included: ? Completed 893 residential energy audits and installed upgrades in 0.05% of all Nevada single-family homes1 ? Achieved an overall conversation rate of 38.1%2 ? 7,089,089 kWh of modeled energy savings3 ? Total annual homeowner energy savings of approximately $525,7523 ? Efficiency upgrades completed on 1,100,484 square feet of homes3 ? $139,992 granted in loans to homeowners for energy-efficiency upgrades ? 29,285 hours of labor and $3,864,272 worth of work conducted by Nevada auditors and contractors4 ? 40 contractors trained in Nevada ? 37 contractors with Building Performance Institute (BPI) certification in Nevada ? 19 contractors actively participating in the EFN program in Nevada 1 Calculated using 2012 U.S. Census data reporting 1,182,870 homes in Nevada. 2 Conversion rate through March 31, 2014, for all Nevada Retrofit Initiative (NRI)-funded projects, calculated using the EFN tracking database. 3 OptiMiser energy modeling, based on current utility rates. 4 This is the sum of $3,596,561 in retrofit invoice value and $247,711 in audit invoice value.

Carvill, Anna; Bushman, Kate; Ellsworth, Amy

2014-06-17T23:59:59.000Z

284

Nevada  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review ofElectronic InputNuclearNature of Transactions (TI)C

285

ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE...  

Broader source: Energy.gov (indexed) [DOE]

068 Re ent: City of Reno, NV ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM Activities Determination Categorical Exclusion Reviewer's Specific Instructions...

286

Subsurface Stratigraphy, Structure, and Alteration in the Senator...  

Open Energy Info (EERE)

the thick vein underlying the cataclasite is essentially unaltered. Authors Stuart D. Johnson and Jeffrey B. Hulen Conference GRC Annual Meeting; Reno, NV; 20020922 Published...

287

Exploration and Development Techniques for Basin and Range Geothermal...  

Open Energy Info (EERE)

Abstract Abstract unavailable. Authors David D. Blackwell, Mark Leidig, Richard P. Smith, Stuart D. Johnson and Kenneth W. Wisian Conference GRC Annual Meeting; Reno, NV;...

288

Geothermometry At Central Nevada Seismic Zone Region (Shevenell...  

Open Energy Info (EERE)

ENERGYGeothermal Home Exploration Activity: Geothermometry At Central Nevada Seismic Zone Region (Shevenell & De Rocher, 2005) Exploration Activity Details Location...

289

EA-1944: Ormat Technologies Brady Hot Springs Project, Churchill County, NV  

Broader source: Energy.gov [DOE]

Ormat Technologies, Inc. (Ormat) proposes to use DOE and cost share funding to study the Brady Hot Springs geothermal Field 15-12RD well. This is an EGS Demonstration project divided into three phases. During Phase 1, Ormat characterized the target well to prepare for stimulation activities in Phase 2, Phase 2: Well Stimulation and Collection/Analysis of Stimulation Monitoring Data and Phase 3: Long-term testing of the system. Phase 2 and 3 activities would occur at Ormat's Brady Hot Springs geothermal field in Churchill County, NV on public lands managed by the Bureau of Land Management (BLM) and Bureau of Reclamation (BOR). Since Phases 2 and 3 have the potential to impact subsurface resources, DOE must analyze the impacts associated with Phases 2 and 3. The BLM will be the lead agency for completion of the EA with BOR and DOE as cooperating agencies.

290

Renewable Energy and the Nevada Test and Training Range  

E-Print Network [OSTI]

1 Renewable Energy and the Nevada Test and Training Range Wednesday, December 15, 2010 Melissa due to renewable energy infrastructure development at the Nevada Test and Training Range. Nevada has have ever-increasing renewable energy goals. However, proposals for the development of 116 renewable

Lewis, Robert Michael

291

ORAL CANCER IN NEVADA: A PUBLIC HEALTH PERSPECTIVE  

E-Print Network [OSTI]

ORAL CANCER IN NEVADA: A PUBLIC HEALTH PERSPECTIVE by Karl Kingsley, PhD Doctor of Philosophy the thesis prepared under our supervision by Karl Kingsley, Ph.D. entitled Oral Cancer in Nevada: A Public May 2010 #12;iii ABSTRACT Oral Cancer in Nevada: A Public Health Perspective by Karl Kingsley, Ph

Ahmad, Sajjad

292

Environmental Survey preliminary report, Nevada Test Site, Mercury, Nevada  

SciTech Connect (OSTI)

This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Nevada Test Site (NTS), conducted June 22 through July 10, 1987. The Survey is being conducted by a multidisciplinary team of environmental specialists led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the NTS. The Survey covers all environment media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations and activities performed at the NTS, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by the Battelle Columbus Division under contract with DOE. When completed, the results will be incorporated into the NTS Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the NTS Survey. 165 refs., 42 figs., 52 tabs.

Not Available

1988-04-01T23:59:59.000Z

293

Geothermal heating for Caliente, Nevada  

SciTech Connect (OSTI)

Utilization of geothermal resources in the town of Caliente, Nevada (population 600) has been the objective of two grants. The first grant was awarded to Ferg Wallis, part-owner and operator of the Agua Caliente Trailer Park, to assess the potential of hot geothermal water for heating the 53 trailers in his park. The results from test wells indicate sustainable temperatures of 140/sup 0/ to 160/sup 0/F. Three wells were drilled to supply all 53 trailers with domestic hot water heating, 11 trailers with space heating and hot water for the laundry from the geothermal resource. System payback in terms of energy cost-savings is estimated at less than two years. The second grant was awarded to Grover C. Dils Medical Center in Caliente to drill a geothermal well and pipe the hot water through a heat exchanger to preheat air for space heating. This geothermal preheater served to convert the existing forced air electric furnace to a booster system. It is estimated that the hospital will save an average of $5300 in electric bills per year, at the current rate of $.0275/KWH. This represents a payback of approximately two years. Subsequent studies on the geothermal resource base in Caliente and on the economics of district heating indicate that geothermal may represent the most effective supply of energy for Caliente. Two of these studies are included as appendices.

Wallis, F.; Schaper, J.

1981-02-01T23:59:59.000Z

294

Nevada Test Site Wetlands Assessment  

SciTech Connect (OSTI)

This report identifies 16 Nevada Test Site (NTS) natural water sources that may be classified by the U.S. Army Corps of Engineers (USACE) as jurisdictional wetlands and identifies eight water sources that may be classified as waters of the United States. These water sources are rare, localized habitats on the NTS that are important to regional wildlife and to isolated populations of water tolerant plants and aquatic organisms. No field investigations on the NTS have been conducted in the past to identify those natural water sources which would be protected as rare habitats and which may fall under regulatory authority of the Clean Water Act (CWA) of 1997. This report identifies and summarizes previous studies of NTS natural water sources, and identifies the current DOE management practices related to the protection of NTS wetlands. This report also presents management goals specific for NTS wetlands that incorporate the intent of existing wetlands legislation, the principles of ecosystem management, and the interests of regional land managers and other stakeholders.

D. J. Hansen

1997-05-01T23:59:59.000Z

295

Nevada National Security Site Waste Acceptance Criteria  

SciTech Connect (OSTI)

This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Nevada National Security Site Waste Acceptance Criteria (NNSSWAC). The NNSSWAC provides the requirements, terms, and conditions under which the Nevada National Security Site (NNSS) will accept low-level radioactive waste and mixed low-level waste for disposal. The NNSSWAC includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NNSS Area 3 and Area 5 Radioactive Waste Management Complex for disposal. The NNSA/NSO and support contractors are available to assist you in understanding or interpreting this document. For assistance, please call the NNSA/NSO Waste Management Project at (702) 295-7063 or fax to (702) 295-1153.

NSTec Environmental Management

2011-01-01T23:59:59.000Z

296

Corrective Action Investigation Plan for Corrective Action Unit 266: Area 25 Building 3124 Leachfield, Nevada Test Site, Nevada, Revision 1, February 1999  

SciTech Connect (OSTI)

The Corrective Action Investigation Plan for Corrective Action Unit 266, Area 25 Building 3124 Leachfield, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U.S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U.S. Department of Defense. Corrective Action Unit 266 consists of the Corrective Action Site 25-05-09 sanitary leachfield and associated collection system. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998d). This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 266. Corrective Action Unit 266 is located southwest of Building 3124 which is located southwest and adjacent to Test Cell A. Test Cell A was operational during the 1960s to test nuclear rocket reactors in support of the Nuclear Rocket Development Station. Operations within Building 3124 from 1962 through the early 1990s resulted in effluent releases to the leachfield and associated collection system. The subsurface soils in the vicinity of the collection system and leachfield may have been impacted by effluent containing contaminants of potential concern generated by support activities associated with Test Cell A reactor testing operations, various laboratories including a high-level radioactivity environmental sample handling laboratory, and possibly the Treatability Test Facility. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include radionuclides, oil/diesel range total petroleum hydrocarbons, and Resource Conservation and Recovery Act characteristic volatile organic compounds, semivolatile organic compounds, and metals. Samples will also be analyzed for radionuclides and polychlorinated biphenyls not considered during the DQO process. Additional samples will be analyzed for geotechnical and hydrological properties and a bioassessment may be performed. The technical approach for investigating this Corrective Action Unit consists of the following activities: (1) Perform a radiological walkover survey. (2) Perform video and radiation surveys of the discharge and outfall lines. (3) Collect samples from within the septic tank. (4) Mark approximate locations of leachfield distribution lines on the ground surface. (5) Collect subsurface soil samples in areas of the collection system including the septic tank and outfall end of the diversion chamber. (6) Collect subsurface soil samples underlying the leachfield distribution pipes. (7) Field screen samples for volatile organic compounds and radiological activity. (8) Drill boreholes and collect subsurface soil samples if required. (9) Analyze soil samples for total volatile organic compounds, total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, total petroleum hydrocarbons (oil/diesel-range organics), and polychlorinated biphenyls. (1) Analyze a minimum of 25 percent of the soil samples for gamma-emitting radionuclides, isotopic uranium, isotopic plutonium, isotopic americium, and strontium-90 if radiological field screening levels are exceeded. (2) Collect samples from native soils beneath the distribution system and analyze for geotechnical/hydrologic parameters. (3) Collect and analyze bioassessment samples at Site Supervisors discretion if volatile organic compounds exceed field-screening levels. Additional sampling and analytical details are presented.

U.S. Department Of Energy, Nevada Operations Office

1999-02-24T23:59:59.000Z

297

Nevada Test Site Radiation Protection Program  

SciTech Connect (OSTI)

Title 10 Code of Federal Regulations (CFR) 835, 'Occupational Radiation Protection', establishes radiation protection standards, limits, and program requirements for protecting individuals from ionizing radiation resulting from the conduct of U.S. Department of Energy (DOE) activities. 10 CFR 835.101(a) mandates that DOE activities be conducted in compliance with a documented Radiation Protection Program (RPP) as approved by DOE. This document promulgates the RPP for the Nevada Test Site (NTS), related (onsite or offsite) DOE National Nuclear Security Administration Nevada Site Office (NNSA/NSO) operations, and environmental restoration offsite projects.

Radiological Control Managers' Council, Nevada Test Site

2007-08-09T23:59:59.000Z

298

Nevada Test Site Waste Acceptance Criteria  

SciTech Connect (OSTI)

This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2005-10-01T23:59:59.000Z

299

Nevada Offsites Fact Sheet | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergy HealthCommentsAugustNational ScienceEnergyNebraska RecoveryNevadaNevada

300

Closure Report for Corrective Action Unit 396: Area 20 Spill Sites, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 396, Area 20 Spill Sites, is located on the Nevada Test Site approximately 105 kilometers (65 miles) northwest of Las Vegas, Nevada. CAU 396 is listed in Appendix II of the Federal Facility Agreement and Consent Order of 1996 and consists of the following four Corrective Action Sites (CASs) located in Area 20 of the Nevada Test Site: CAS 20-25-01, Oil Spills (2); CAS 20-25-02, Oil Spills; CAS 20-25-03, Oil Spill; CAS 20-99-08, Spill. Closure activities for CAU 396 were conducted in accordance with the Federal Facility Agreement and Consent Order and the Nevada Division of Environmental Protection-approved Streamlined Approach for Environmental Restoration Plan for CAU 396.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

2004-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

EA-1115: Liquid Waste Treatment at the Nevada Test Site, Nye County, Nevada  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of the proposal to treat low-level radioactive liquid and low-level mixed liquid and semi-solid wastes generated at the U.S. Department of Energy Nevada...

302

EA-1097: Solid waste Disposal- Nevada Test Site, Nye County, Nevada  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of the proposal to continue the on-site disposal of solid waste at the Area 9 and Area 23 landfills at the U.S. Department of Energy Nevada Test Site...

303

NV Energy Solar Integration Study: Cycling and Movements of Conventional Generators for Balancing Services  

SciTech Connect (OSTI)

With an increasing penetration level of solar power in the southern Nevada system, the impact of solar on system operations needs to be carefully studied from various perspectives. Qualitatively, it is expected that the balancing requirements to compensate for solar power variability will be larger in magnitude; meanwhile, generators providing load following and regulation services will be moved up or down more frequently. One of the most important tasks is to quantitatively evaluate the cycling and movements of conventional generators with solar power at different penetration levels. This study is focused on developing effective methodologies for this goal and providing a basis for evaluating the wear and tear of the conventional generators

Diao, Ruisheng; Lu, Shuai; Etingov, Pavel V.; Ma, Jian; Makarov, Yuri V.; Guo, Xinxin

2011-07-01T23:59:59.000Z

304

CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 528: POLYCHLORINATED BIPHENYLS CONTAMINATION NEVADA TEST SITE, NEVADA  

SciTech Connect (OSTI)

This Closure Report (CR) describes the closure activities performed at CAU 528, Polychlorinated Biphenyls Contamination, as presented in the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) (US. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSAINSO], 2005). The approved closure alternative was closure in place with administrative controls. This CR provides a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.

BECHTEL NEVADA

2006-09-01T23:59:59.000Z

305

A preliminary investigation of the structure of southern Yucca Flat, Massachusetts Mountain, and CP basin, Nevada Test Site, Nevada, based on geophysical modeling.  

SciTech Connect (OSTI)

New gravity and magnetic data collected in the vicinity of Massachusetts Mountain and CP basin (Nevada Test Site, NV) provides a more complex view of the structural relationships present in the vicinity of CP basin than previous geologic models, helps define the position and extent of structures in southern Yucca Flat and CP basin, and better constrains the configuration of the basement structure separating CP basin and Frenchman Flat. The density and gravity modeling indicates that CP basin is a shallow, oval-shaped basin which trends north-northeast and contains ~800 m of basin-filling rocks and sediment at its deepest point in the northeast. CP basin is separated from the deeper Frenchman Flat basin by a subsurface ridge that may represent a Tertiary erosion surface at the top of the Paleozoic strata. The magnetic modeling indicates that the Cane Spring fault appears to merge with faults in northwest Massachusetts Mountain, rather than cut through to Yucca Flat basin and that the basin is downed-dropped relative to Massachusetts Mountain. The magnetic modeling indicates volcanic units within Yucca Flat basin are down-dropped on the west and supports the interpretations of Phelps and KcKee (1999). The magnetic data indicate that the only faults that appear to be through-going from Yucca Flat into either Frenchman Flat or CP basin are the faults that bound the CP hogback. In general, the north-trending faults present along the length of Yucca Flat bend, merge, and disappear before reaching CP hogback and Massachusetts Mountain or French Peak.

Geoffrey A. Phelps; Leigh Justet; Barry C. Moring, and Carter W. Roberts

2006-03-17T23:59:59.000Z

306

Nevada`s energy research strategy. Progress report, September 30, 1991--September 29, 1992  

SciTech Connect (OSTI)

This document was produced by the University and Community College System of Nevada (UCCSN) under a grant from the US Department of Energy (DOE) Office of Energy Research as part of the DOE-Experimental Program for the Simulation of Competitive Research (DOE-EPSCoR). The document develops Nevada`s strategies for the UCCSN to broaden and deepen energy-related research over the next five years in hydrology sciences, environmental biology and chemistry, chemical physics, and global change. A strategy was also developed to support energy-related research with education and human resources in science, math and engineering. A key concept of these strategies is continued success under the DOE-EPSCOR program. Participation in the Environmental Restoration and Waste Management, Civilian Radioactive Waste Management, Basic Energy Science and Global Climate Change programs in collaboration with the Nevada Test Site and DOE multi-program laboratories is also part of Nevada`s strategy for success in energy-related research.

McNelis, D.N.

1992-10-01T23:59:59.000Z

307

Nevada Test Site Environmental Report 2007  

SciTech Connect (OSTI)

The Nevada Test Site Environmental Report 2007 (NTSER) was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. It was prepared by National Security Technologies, LLC (NSTec). This Executive Summary presents the purpose of the document, the major programs conducted at the Nevada Test Site (NTS), NTS key environmental initiatives, radiological releases and potential doses to the public resulting from site operations, a summary of nonradiological releases, implementation status of the NTS Environmental Management System, a summary of compliance with environmental regulations, pollution prevention and waste minimization accomplishments, and significant environmental accomplishments. Much of the content of this Executive Summary is also presented in a separate stand-alone pamphlet titled Nevada Test Site Environmental Report Summary 2007. This NTSER was prepared to satisfy DOE Order 231.1A, Environment, Safety and Health Reporting. Its purpose is to (1) report compliance status with environmental standards and requirements, (2) present results of environmental monitoring of radiological and nonradiological effluents, (3) report estimated radiological doses to the public from releases of radioactive material, (4) summarize environmental incidents of noncompliance and actions taken in response to them, (5) describe the NTS Environmental Management System and characterize its performance, and (6) highlight significant environmental programs and efforts. This report meets these objectives for the NTS and three offsite Nevada facilities mentioned in this report.

Cathy Wills

2008-09-01T23:59:59.000Z

308

Nevada Test Site Treatment Plan. Revision 2  

SciTech Connect (OSTI)

Treatment Plans (STPS) are required for facilities at which the US Department of Energy (DOE) or stores mixed waste, defined by the Federal Facility Compliance Act (FFCAct) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act and a radioactive material subject to the Atomic Energy Act. On April 6, 1993, DOE published a Federal Register notice (58 FR 17875) describing its proposed process for developing the STPs in three phases including a Conceptual, a Draft, and a Proposed Site Treatment Plan (PSTP). All of the DOE Nevada Operations Office STP iterations have been developed with the state of Nevada`s input. The options and schedules reflect a ``bottoms-up`` approach and have been evaluated for impacts on other DOE sites, as well as impacts to the overall DOE program. Changes may have occurred in the preferred option and associated schedules between the PSTP, which was submitted to the state of Nevada and US Environmental Protection Agency April 1995, and the Final STP (hereafter referred to as the STP) as treatment evaluations progressed. The STP includes changes that have occurred since the submittal of the PSTP as a result of state-to-state and DOE-to-state discussions.

NONE

1996-03-01T23:59:59.000Z

309

Nevada Bureau of Mines and Geology  

E-Print Network [OSTI]

are included. Metals Industrial Minerals Oil and Gas Geothermal Exploration Development Mining Processing This report, nineteenth of an annual series, describes 1997 mineral, oil and gas, and geothermal activities and accomplishments in Nevada: production statistics, exploration and development including drilling for petroleum

Tingley, Joseph V.

310

Nevada Bureau of Mines and Geology  

E-Print Network [OSTI]

are included. Metals Industrial Minerals Oil and Gas Geothermal Exploration Development Mining Processing This report, twentieth of an annual series, describes 1998 mineral, oil and gas, and geothermal activities and accomplishments in Nevada: production statistics, exploration and development including drilling for petroleum

Tingley, Joseph V.

311

Capacity Value of PV and Wind Generation in the NV Energy System  

SciTech Connect (OSTI)

Calculation of photovoltaic (PV) and wind power capacity values is important for estimating additional load that can be served by new PV or wind installations in the electrical power system. It also is the basis for assigning capacity credit payments in systems with markets. Because of variability in solar and wind resources, PV and wind generation contribute to power system resource adequacy differently from conventional generation. Many different approaches to calculating PV and wind generation capacity values have been used by utilities and transmission operators. Using the NV Energy system as a study case, this report applies peak-period capacity factor (PPCF) and effective load carrying capability (ELCC) methods to calculate capacity values for renewable energy sources. We show the connection between the PPCF and ELCC methods in the process of deriving a simplified approach that approximates the ELCC method. This simplified approach does not require generation fleet data and provides the theoretical basis for a quick check on capacity value results of PV and wind generation. The diminishing return of capacity benefit as renewable generation increases is conveniently explained using the simplified capacity value approach.

Lu, Shuai; Diao, Ruisheng; Samaan, Nader A.; Etingov, Pavel V.

2014-03-21T23:59:59.000Z

312

CBER-DETR Nevada Coincident and Leading Employment Data Continue to Send Mixed Signals on the End of Nevada's Employment Recession  

E-Print Network [OSTI]

Statistics. The Nevada Coincident Employment Index includes four employment measures ­ household employmentCBER-DETR Nevada Coincident and Leading Employment Indexes1 Data Continue to Send Mixed Signals on the End of Nevada's Employment Recession The Nevada Coincident Employment Index measures the ups and downs

Ahmad, Sajjad

313

E-Print Network 3.0 - area nevada test Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CAPTIVE BREEDING CONTINGENCY PLAN A Guide for Captive Breeding of Sierra Nevada Bighorn Sheep... for Captive Breeding of Sierra Nevada Bighorn Sheep. Report for Interagency...

314

E-Print Network 3.0 - areas nevada test Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CAPTIVE BREEDING CONTINGENCY PLAN A Guide for Captive Breeding of Sierra Nevada Bighorn Sheep... for Captive Breeding of Sierra Nevada Bighorn Sheep. Report for Interagency...

315

E-Print Network 3.0 - area southwestern nevada Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ranging from the Sierra Nevada in California to southwestern Utah... within Clark County, Nevada, typify several fast-growing urban areas within former tortoise habitat...

316

Integrated Closure and Monitoring Plan for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site  

SciTech Connect (OSTI)

Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) (one site is in Area 3 and the other is in Area 5) at the Nevada Test Site (NTS) for the U.S. Department of Energy's (DOE's) National Nuclear Security Administration Nevada Operations Office (NNSA/NV). The current DOE Order governing management of radioactive waste is 435.1. Associated with DOE Order 435.1 is a Manual (DOE M 435.1-1) and Guidance (DOE G 435.1-1). The Manual and Guidance specify that preliminary closure and monitoring plans for a low-level waste (LLW) management facility be developed and initially submitted with the Performance Assessment (PA) and Composite Analysis (CA) for that facility. The Manual and Guidance, and the Disposal Authorization Statement (DAS) issued for the Area 3 RWMS further specify that the preliminary closure and monitoring plans be updated within one year following issuance of a DAS. This Integrated Closure and Monitoring Plan (ICMP) fulfills both requirements. Additional updates will be conducted every third year hereafter. This document is an integrated plan for closing and monitoring both RWMSs, and is based on guidance issued in 1999 by the DOE for developing closure plans. The plan does not follow the format suggested by the DOE guidance in order to better accommodate differences between the two RWMSs, especially in terms of operations and site characteristics. The modification reduces redundancy and provides a smoother progression of the discussion. The closure and monitoring plans were integrated because much of the information that would be included in individual plans is the same, and integration provides efficient presentation and program management. The ICMP identifies the regulatory requirements, describes the disposal sites and the physical environment where they are located, and defines the approach and schedule for both closing and monitoring the sites.

S. E. Rawlinson

2001-09-01T23:59:59.000Z

317

El Reno Extended Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed NewcatalystNeutronEnvironmentZIRKLEEFFECTS OF CHRONICSessionEinsteinPhysicsCleverEl

318

Closure Report for Corrective Action Unit 130: Storage Tanks Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 130: Storage Tanks, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 130 are located within Areas 1, 7, 10, 20, 22, and 23 of the Nevada Test Site. Corrective Action Unit 130 is comprised of the following CASs: • 01-02-01, Underground Storage Tank • 07-02-01, Underground Storage Tanks • 10-02-01, Underground Storage Tank • 20-02-03, Underground Storage Tank • 20-99-05, Tar Residue • 22-02-02, Buried UST Piping • 23-02-07, Underground Storage Tank This CR provides documentation supporting the completed corrective action investigations and provides data confirming that the closure objectives for CASs within CAU 130 were met. To achieve this, the following actions were performed: • Reviewed the current site conditions, including the concentration and extent of contamination. • Implemented any corrective actions necessary to protect human health and the environment. • Properly disposed of corrective action and investigation-derived wastes. From August 4 through September 30, 2008, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 130, Storage Tanks, Nevada Test Site, Nevada. The purposes of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, confirm that no residual contamination is present, and properly dispose of wastes. Constituents detected during the closure activities were evaluated against final action levels to identify COCs for CAU 130. Assessment of the data generated from closure activities indicates that no further action is necessary because no COCs were identified at any CAU 130 CAS. Debris removal from these CASs was considered a best management practice because no contamination was detected. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • No further corrective action is required at all CAU 130 CASs. • A Notice of Completion to DOE, National Nuclear Security Administration Nevada Site Office, is requested from the Nevada Division of Environmental Protection for closure of CAU 130. • Corrective Action Unit 130 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.

Alfred Wickline

2009-03-01T23:59:59.000Z

319

Closure Report for Corrective Action Unit 398: Area 25 Spill Sites, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Closure Report (CR) documents the activities performed to close Corrective Action Unit (CAU) 398: Area 25 Spill Sites, in accordance with the Federal Facility Agreement and Consent Order (FFACO) of 1996, and the Nevada Division of Environmental Protection (NDEP)-approved Streamlined Approach for Environmental Restoration (SA4FER) Plan for CAU 398: Area 25 Spill Sites, Nevada Test Site, Nevada (U.S. Department of Energy, Nevada Operations Office [DOEN], 2001). CAU 398 consists of the following thirteen Corrective Action Sites (CASs) all located in Area 25 of the Nevada Test Site (NTS) (Figure 1): CAS 25-25-02, Oil Spills, CAS 25-25-03, Oil Spills, CAS 25-25-04, Oil Spills, CAS 25-25-05, Oil Spills, CAS 25-25-06, Oil Spills, CAS 25-25-07, Hydraulic Oil Spill(s), CAS 25-25-08, Hydraulic Oil Spill(s), CAS 25-25-16, Diesel Spill (from CAS 25-01-02), CAS 25-25-17, Subsurface Hydraulic Oil Spill, CAS 25-44-0 1, Fuel Spill, CAS 25-44-04, Acid Spill (from CAS 25-01-01), CAS 25-44-02, Spill, and CAS 25-44-03, Spill. Copies of the analytical results for the site verification samples are included in Appendix B. Copies of the CAU Use Restriction Information forms are included in Appendix C.

K. B. Campbell

2003-04-01T23:59:59.000Z

320

Nevada: Kingston Creek Hydro Project Powers 100 Households |...  

Energy Savers [EERE]

in Nevada: Extracting Heat From the Earth to Generate Sustainable Power Geothermal Energy Growth Continues, Industry Survey Reports Project Overview Positive Impact...

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Development Wells At Salt Wells Area (Nevada Bureau of Mines...  

Open Energy Info (EERE)

Salt Wells Area (Nevada Bureau of Mines and Geology, 2009) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Development Wells At Salt Wells Area...

322

Data Acquisition-Manipulation At Central Nevada Seismic Zone...  

Open Energy Info (EERE)

- 2) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Central Nevada Seismic Zone Region (Coolbaugh, Et Al., 2005...

323

Nevada Department of Transportation - Terms and Conditions Relating...  

Open Energy Info (EERE)

Transportation - Terms and Conditions Relating to Highway Occupancy Permits Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Nevada Department of...

324

Review of Nevada Site Office Criticality Safety Assessments at...  

Broader source: Energy.gov (indexed) [DOE]

an independent review of the National Nuclear Security AdministrationNevada Site Office Conduct of Operations Management Assessment Final Report, dated October 2011. The subject...

325

Independent Activity Report, Nevada National Security Site- July 2011  

Broader source: Energy.gov [DOE]

Review of Nevada National Security Site Device Assembly Facility Justification for Continued Operations for Inoperable HEPA-Filtered Ventilation System [HIAR-NNSS-2011-07-08

326

Independent Oversight Inspection, Nevada Test Site, Summary Report...  

Broader source: Energy.gov (indexed) [DOE]

Summary Report - October 2002 Independent Oversight Inspection, Nevada Test Site, Summary Report - October 2002 October 2002 Inspection of Environment, Safety, and Health and...

327

Aerial Photography At Nevada Test And Training Range Area (Sabin...  

Open Energy Info (EERE)

GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Aerial Photography At Nevada Test And Training Range Area (Sabin, Et Al., 2004) Exploration Activity Details Location...

328

Independent Oversight Inspection, Nevada Test Site - June 2007...  

Broader source: Energy.gov (indexed) [DOE]

Environment, Safety, and Health Programs at the Nevada Test Site This report provides the results of an inspection of the environment, safety, and health programs at the Department...

329

Reservoir-Scale Fracture Permeability in the Dixie Valley, Nevada...  

Open Energy Info (EERE)

Reservoir-Scale Fracture Permeability in the Dixie Valley, Nevada, Geothermal Field Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Paper:...

330

Modeling-Computer Simulations At Central Nevada Seismic Zone...  

Open Energy Info (EERE)

Central Nevada Seismic Zone Geothermal Region Exploration Technique Modeling-Computer Simulations Activity Date Usefulness not indicated DOE-funding Unknown References J. W....

331

Modeling-Computer Simulations At Nevada Test And Training Range...  

Open Energy Info (EERE)

navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Modeling-Computer Simulations At Nevada Test And Training Range Area (Sabin, Et Al., 2004) Exploration...

332

Geodetic Survey At Central Nevada Seismic Zone Region (Blewitt...  

Open Energy Info (EERE)

ENERGYGeothermal Home Exploration Activity: Geodetic Survey At Central Nevada Seismic Zone Region (Blewitt Et Al, 2005) Exploration Activity Details Location Central...

333

Geodetic Survey At Central Nevada Seismic Zone Region (Blewitt...  

Open Energy Info (EERE)

Blewitt, Et Al., 2003) Exploration Activity Details Location Central Nevada Seismic Zone Geothermal Region Exploration Technique Geodetic Survey Activity Date Usefulness useful...

334

Teleseismic-Seismic Monitoring At Central Nevada Seismic Zone...  

Open Energy Info (EERE)

navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Central Nevada Seismic Zone Region (Biasi, Et Al., 2008) Exploration...

335

Field Mapping At Central Nevada Seismic Zone Region (Blewitt...  

Open Energy Info (EERE)

Region (Blewitt, Et Al., 2003) Exploration Activity Details Location Central Nevada Seismic Zone Geothermal Region Exploration Technique Field Mapping Activity Date Usefulness...

336

Geographic Information System At Central Nevada Seismic Zone...  

Open Energy Info (EERE)

Home Exploration Activity: Geographic Information System At Central Nevada Seismic Zone Region (Coolbaugh, Et Al., 2005 - 2) Exploration Activity Details Location...

337

Field Mapping At Central Nevada Seismic Zone Region (Shevenell...  

Open Energy Info (EERE)

Shevenell, Et Al., 2008) Exploration Activity Details Location Central Nevada Seismic Zone Geothermal Region Exploration Technique Field Mapping Activity Date Usefulness could be...

338

Geographic Information System At Central Nevada Seismic Zone...  

Open Energy Info (EERE)

Central Nevada Seismic Zone Geothermal Region Exploration Technique Geographic Information System Activity Date Usefulness useful regional reconnaissance DOE-funding Unknown...

339

Refraction Survey At Central Nevada Seismic Zone Region (Heimgartner...  

Open Energy Info (EERE)

Central Nevada Seismic Zone Region (Heimgartner, Et Al., 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Refraction Survey At Central...

340

Exploration and Development at Dixie Valley, Nevada- Summary...  

Open Energy Info (EERE)

at Dixie Valley, Nevada- Summary of Doe Studies Authors David D. Blackwell, Richard P. Smith and Maria C. Richards Conference Thirty-Second Workshop on Geothermal Reservoir...

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

An investigation of the Dixie Valley geothermal field, Nevada...  

Open Energy Info (EERE)

geothermal field, Nevada, using temporal moment analysis of tracer tests Author Marshall J. Reed Conference Proceedings, 32nd Workshop on Geothermal Reservoir Engineering;...

342

First Subcritical Experiment Conducted at Nevada Test Site |...  

National Nuclear Security Administration (NNSA)

Subcritical Experiment Conducted at Nevada Test Site | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

343

Corrective Action Investigation Plan for Corrective Action Unit 99: Rainier Mesa/Shoshone Mountain, Nevada Test Site, Nevada with Errata and ROTC 1, Rev. No. 0  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) was developed for Corrective Action Unit (CAU) 99, Rainier Mesa/Shoshone Mountain. The CAIP is a requirement of the ''Federal Facility Agreement and Consent Order'' (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (DoD) (FFACO, 1996). The FFACO addresses environmental restoration activities at U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) facilities and sites including the underground testing area(s) of the Nevada Test Site (NTS). This CAIP describes the investigation activities currently planned for the Rainier Mesa/Shoshone Mountain CAU. These activities are consistent with the current Underground Test Area (UGTA) Project strategy described in Section 3.0 of Appendix VI, Revision No. 1 (December 7, 2000) of the FFACO (1996) and summarized in Section 2.1.2 of this plan. The Rainier Mesa/Shoshone Mountain CAU extends over several areas of the NTS (Figure 1-1) and includes former underground nuclear testing locations in Areas 12 and 16. The area referred to as ''Rainier Mesa'' includes the geographical area of Rainier Mesa proper and the contiguous Aqueduct Mesa. Figure 1-2 shows the locations of the tests (within tunnel complexes) conducted at Rainier Mesa. Shoshone Mountain is located approximately 20 kilometers (km) south of Rainier Mesa, but is included within the same CAU due to similarities in their geologic setting and in the nature and types of nuclear tests conducted. Figure 1-3 shows the locations of the tests conducted at Shoshone Mountain. The Rainier Mesa/Shoshone Mountain CAU falls within the larger-scale Rainier Mesa/Shoshone Mountain Investigation Area, which also includes the northwest section of the Yucca Flat CAU as shown in Figure 1-1. Rainier Mesa and Shoshone Mountain lie adjacent to the Timber Mountain Caldera Complex and are composed of volcanic rocks that erupted from the caldera as well as from more distant sources. This has resulted in a layered volcanic stratigraphy composed of thick deposits of welded and nonwelded ash-flow tuff and lava flows. These deposits are proximal to the source caldera and are interstratified with the more distal facies of fallout tephra and bedded reworked tuff from more distant sources. In each area, a similar volcanic sequence was deposited upon Paleozoic carbonate and siliciclastic rocks that are disrupted by various thrust faults, normal faults, and strike-slip faults. In both Rainier Mesa (km) to the southwest, and Tippipah Spring, 4 km to the north, and the tunnel complex is dry. Particle-tracking simulations performed during the value of information analysis (VOIA) (SNJV, 2004b) indicate that most of the regional groundwater that underlies the test locations at Rainier Mesa and Shoshone Mountain eventually follows similar and parallel paths and ultimately discharges in Death Valley and the Amargosa Desert. Particle-tracking simulations conducted for the regional groundwater flow and risk assessment indicated that contamination from Rainier Mesa and Shoshone Mountain were unlikely to leave the NTS during the 1,000-year period of interest (DOE/NV, 1997a). It is anticipated that CAU-scale modeling will modify these results somewhat, but it is not expected to radically alter the outcome of these previous particle-tracking simulations within the 1,000-year period of interest. The Rainier Mesa/Shoshone Mountain CAIP describes the corrective action investigation (CAI) to be conducted at the Rainier Mesa/Shoshone Mountain CAU to evaluate the extent of contamination in groundwater due to the underground nuclear testing. The CAI will be conducted by the UGTA Project, which is part of the NNSA/NSO Environmental Restoration Project (ERP). The purpose and scope of the CAI are presented in this section, followed by a summary of the entire document.

John McCord; Marutzky, Sam

2004-12-01T23:59:59.000Z

344

Analysis of FY 2005/2006 Hydrologic Testing and Sampling Results for Well ER-12-4, Nevada Test Site, Nye County, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

This report documents the analysis of data collected for ER-12-4 during the fiscal year (FY) 2005 Rainier Mesa/Shoshone Mountain well development and hydraulic testing program (herein referred to as the ''testing program'') and hydraulic response data from the FY 2006 Sampling Program. Well ER-12-4 was constructed and tested as a part of the Corrective Action Unit (CAU) 99, Rainier Mesa/Shoshone Mountain, Phase I drilling program during FY 2005. These activities were conducted on behalf of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) for the Underground Test Area (UGTA) Subproject. As shown on Figure 1-1, ER-12-4 is located in central Rainier Mesa, in Area 12 of the Nevada Test Site (NTS). Figure 1-2 shows the well location in relation to the tunnels under Rainier Mesa. The well was drilled to a total depth (TD) of 3,715 feet (ft) below ground surface (bgs) (surface elevation 6,883.7 ft above mean sea level [amsl]) in the area of several tunnels mined into Rainier Mesa that were used historically for nuclear testing (NNSA/NSO, 2006). The closest nuclear test to the well location was MIGHTY OAK (U-12t.08), conducted in the U-12t Tunnel approximately 475 ft north of the well site. The MIGHTY OAK test working point elevation was located at approximately 5,620 ft amsl. The MIGHTY OAK test had an announced yield of ''less than 20 kilotons'' (DOE/NV, 2000). The purpose of this hydrogeologic investigation well is to evaluate the deep Tertiary volcanic section below the tunnel level, which is above the regional water table, and to provide information on the section of the lower carbonate aquifer - thrust plate (LCA3), located below the Tertiary volcanic section (SNJV, 2005b). Details on the drilling and completion program are presented in the ''Completion Report for Well ER-12-4 Corrective Action Unit 99: Rainier Mesa-Shoshone Mountain'' (NNSA/NSO, 2006). Participants in ER-12-4 testing activities were: Stoller-Navarro Joint Venture (SNJV), Bechtel Nevada (BN), Desert Research Institute (DRI), Los Alamos National Laboratory (LANL), Lawrence Livermore National Laboratory (LLNL), and the U.S. Geological Survey (USGS). Stoller-Navarro Joint Venture served as the lead contractor responsible for providing site supervision, development and testing services, and waste management services; BN provided construction and engineering support services; DRI provided well logging services and participated in groundwater sampling and laboratory analyses; LANL and LLNL participated in groundwater sampling and laboratory analyses; and the USGS performed laboratory analyses. Analyses of data from the ER-12-4 testing program presented in this document were performed by SNJV except as noted. These same contractors participated in the FY 2006 Sampling Program.

Bill Fryer

2006-09-01T23:59:59.000Z

345

Closure Report for Corrective Action Unit 177: Mud Pits and Cellars Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 177: Mud Pits and Cellars, Nevada Test Site, Nevada. This Closure Report complies with the requirements of the Federal Facility Agreement and Consent Order (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The Corrective Action Sites (CASs) within CAU 177 are located within Areas 8, 9, 19, and 20 of the Nevada Test Site. The purpose of this Closure Report is to provide documentation supporting the completed corrective actions and data that confirm the corrective actions implemented for CAU 177 CASs.

Alfred Wickline

2007-02-01T23:59:59.000Z

346

Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

Irene Farnham

2011-05-01T23:59:59.000Z

347

Nevada: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte3InformationofServicesNeuCo IncWorkNevada Jump to:

348

Hawthorne, Nevada: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:Greer CountyCorridor |InformationNevada: Energy Resources

349

Nevada National Security Site Waste Acceptance Criteria  

SciTech Connect (OSTI)

This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO), Nevada National Security Site Waste Acceptance Criteria (NNSSWAC). The NNSSWAC provides the requirements, terms, and conditions under which the Nevada National Security Site (NNSS) will accept DOE non-radioactive classified waste, DOE non-radioactive hazardous classified waste, DOE low-level radioactive waste (LLW), DOE mixed low-level waste (MLLW), and U.S. Department of Defense (DOD) classified waste for permanent disposal. Classified waste is the only waste accepted for disposal that may be non-radioactive and will be required to meet the waste acceptance criteria for radioactive waste as specified in this document. The NNSA/NSO and support contractors are available to assist you in understanding or interpreting this document. For assistance, please call the NNSA/NSO Waste Management Project (WMP) at (702) 295-7063, and your call will be directed to the appropriate contact.

NSTec Environmental Management

2012-02-28T23:59:59.000Z

350

Nevada National Security Site Waste Acceptance Criteria  

SciTech Connect (OSTI)

This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO), Nevada National Security Site Waste Acceptance Criteria (NNSSWAC). The NNSSWAC provides the requirements, terms, and conditions under which the Nevada National Security Site (NNSS) will accept the following: ? DOE hazardous and non-hazardous non-radioactive classified waste ? DOE low-level radioactive waste (LLW) ? DOE mixed low-level waste (MLLW) ? U.S. Department of Defense (DOD) classified waste The LLW and MLLW listed above may also be classified waste. Classified waste is the only waste accepted for disposal that may be non-radioactive and shall be required to meet the waste acceptance criteria for radioactive waste as specified in this document. Classified waste may be sent to the NNSS as classified matter. Section 3.1.18 provides the requirements that must be met for permanent burial of classified matter. The NNSA/NFO and support contractors are available to assist the generator in understanding or interpreting this document. For assistance, please call the NNSA/NFO Environmental Management Operations (EMO) at (702) 295-7063, and the call will be directed to the appropriate contact.

none,

2013-06-01T23:59:59.000Z

351

Nevada Test Site Environmental Summary Report 2006  

SciTech Connect (OSTI)

The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) directs the management and operation of the Nevada Test Site (NTS). The NTS is the nation's historical testing site for nuclear weapons from 1951 through 1992 and is currently the nation's unique site for ongoing national-security related missions and high-risk operations. NNSA/NSO strives to provide to the public an understanding of the current activities on the NTS, including environmental monitoring and compliance activities aimed at protecting the public and the environment from radiation hazards and from nonradiological impacts. This document is a summary of the Nevada Test Site Environmental Report (NTSER) for calendar year 2006 (see attached compact disc on inside back cover). The NTSER is a comprehensive report of environmental activities performed at the NTS and its satellite facilities over the previous calendar year. It is prepared annually to meet the requirements and guidelines of the U.S. Department of Energy (DOE) and the information needs of NNSA/NSO stakeholders. To provide an abbreviated and more readable version of the NTSER, this summary report is produced. This summary does not include detailed data tables, monitoring methods or design, a description of the NTS environment, or a discussion of all environmental program activities performed throughout the year. The reader may obtain a hard copy of the full NTSER as directed on the inside front cover of this summary report.

Cathy Wills

2007-10-01T23:59:59.000Z

352

Nevada Test Site Summary 2006 (Volume 2)  

SciTech Connect (OSTI)

The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) directs the management and operation of the Nevada Test Site (NTS). The NTS is the nation's historical testing site for nuclear weapons from 1951 through 1992 and is currently the nation's unique site for ongoing national-security-related missions and high-risk operations. NNSA/NSO strives to provide to the public an understanding of the current activities on the NTS, including environmental monitoring and compliance activities aimed at protecting the public and the environment from radiation hazards and from nonradiological impacts. This document is a summary of the Nevada Test Site Environmental Report (NTSER) for calendar year 2006 (see attached compact disc on inside back cover). The NTSER is a comprehensive report of environmental activities performed at the NTS and its satellite facilities over the previous calendar year. It is prepared annually to meet the requirements and guidelines of the U.S. Department of Energy (DOE) and the information needs of NNSA/NSO stakeholders. To provide an abbreviated and more readable version of the NTSER, this summary report is produced. This summary does not include detailed data tables, monitoring methods or design, a description of the NTS environment, or a discussion of all environmental program activities performed throughout the year. The reader may obtain a hard copy of the full NTSER as directed on the inside front cover of this summary report.

Cathy Wills

2007-10-01T23:59:59.000Z

353

Nevada Test Site Environmental Report 2007 Summary  

SciTech Connect (OSTI)

The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) directs the management and operation of the Nevada Test Site (NTS). The NTS is the nation's historical testing site for nuclear weapons from 1951 through 1992 and is currently the nation's unique site for ongoing national-security related missions and high-risk operations. NNSA/NSO strives to provide to the public an understanding of the current activities on the NTS, including environmental monitoring and compliance activities aimed at protecting the public and the environment from radiation hazards and from nonradiological impacts. This document is a summary of the Nevada Test Site Environmental Report (NTSER) for calendar year 2007 (see attached compact disc on inside back cover). The NTSER is a comprehensive report of environmental activities performed at the NTS and offsite facilities over the previous calendar year. It is prepared annually to meet the requirements and guidelines of the U.S. Department of Energy (DOE) and the information needs of NNSA/NSO stakeholders. To provide an abbreviated and more readable version of the NTSER, this summary report is produced. This summary does not include detailed data tables, monitoring methods or design, a description of the NTS environment, or a discussion of all environmental program activities performed throughout the year. The reader may obtain a hard copy of the full NTSER as directed on the inside front cover of this summary report.

Cathy Wills

2008-09-01T23:59:59.000Z

354

Corrective Action Investigation Plan for Corrective Action Unit 486: Double Tracks RADSAFE Area Nellis Air Force Range, Nevada  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 486, the Double Tracks Radiological Safety (RADSAFE) Area (DTRSA) which is located on the Nellis Air Force Range 71North (N), west of the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range Complex, is approximately 255 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 486 is comprised of CAS 71-23-001-71DT consisting of two areas of concern referred to as the vehicle decontamination area and the animal burial pit. The DTRSA is located on the west side of the Cactus Range approximately 8 km (5 mi) southwest of the Cactus Spring gate at the intersection of the Cactus Spring Road and the Double Tracks Control Point Road (Figure 1-2). The DTRSA was used during May 1963 to decontaminate vehicles, equipment, personnel, and animals from the Double Tracks test. The DTRSA is one of three areas identified as a potential location for the disposal of radioactively contaminated materials from the Double Tracks experiment. The other two locations are the Cactus Spring Waste Trenches (CAU 426) and the Roller Coaster RADSAFE Area (CAU 407), both of which have been investigated. The surface and subsurface soils are likely to have been impacted by plutonium and other contaminants of potential concern (COPCs) associated with decontamination activities at this site.

IT Las Vegas

1998-10-15T23:59:59.000Z

355

Addendum to the Closure Report for Corrective Action Unit 403: Second Gas Station, Tonopah Test Range, Nevada, Revision 0  

SciTech Connect (OSTI)

This document constitutes an addendum to the Closure Report for Corrective Action Unit 403: Second Gas Station, Tonopah Test Range, Nevada, September 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-02-004-0360, Underground Storage Tanks. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.

Grant Evenson

2009-05-01T23:59:59.000Z

356

CBER-DETR Nevada Coincident and Leading Employment Sailing in the Doldrums  

E-Print Network [OSTI]

the seasonally adjusted data reported by the Bureau of Labor Statistics. The Nevada Coincident Employment IndexCBER-DETR Nevada Coincident and Leading Employment Indexes1 Sailing in the Doldrums The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using an index of employment

Ahmad, Sajjad

357

CBER-DETR Nevada Coincident and Leading Employment Leading Index Hits Bump in the Road  

E-Print Network [OSTI]

the seasonally adjusted data reported by the Bureau of Labor Statistics. The Nevada Coincident Employment IndexCBER-DETR Nevada Coincident and Leading Employment Indexes1 Leading Index Hits Bump in the Road The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using an index

Ahmad, Sajjad

358

CBER-DETR Nevada Coincident and Leading Employment Both Indexes Up in September 2012  

E-Print Network [OSTI]

the seasonally adjusted data reported by the Bureau of Labor Statistics. The Nevada Coincident Employment IndexCBER-DETR Nevada Coincident and Leading Employment Indexes1 Both Indexes Up in September 2012 The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using an index

Ahmad, Sajjad

359

CBER-DETR Nevada Coincident and Leading Employment Mixed Signals Still Persist  

E-Print Network [OSTI]

Statistics. The Nevada Coincident Employment Index includes four employment measures ­ household employmentCBER-DETR Nevada Coincident and Leading Employment Indexes1 Mixed Signals Still Persist The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using an index of employment

Ahmad, Sajjad

360

CBER-DETR Nevada Coincident and Leading Employment Another Good Month for the Indexes  

E-Print Network [OSTI]

Statistics. The Nevada Coincident Employment Index includes four employment measures ­ household employmentCBER-DETR Nevada Coincident and Leading Employment Indexes1 Another Good Month for the Indexes The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using an index

Ahmad, Sajjad

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

CBER-DETR Nevada Coincident and Leading Employment No Clear Signal  

E-Print Network [OSTI]

by the Bureau of Labor Statistics. The Nevada Coincident Employment Index includes four employment measuresCBER-DETR Nevada Coincident and Leading Employment Indexes1 No Clear Signal by Bob Potts Center for Business and Economic Research University of Nevada, Las Vegas The Nevada Coincident Employment Index

Ahmad, Sajjad

362

CBER-DETR Nevada Coincident and Leading Employment Both Indexes Drop in July  

E-Print Network [OSTI]

Statistics. The Nevada Coincident Employment Index includes four employment measures ­ household employmentCBER-DETR Nevada Coincident and Leading Employment Indexes1 Both Indexes Drop in July The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using an index of employment

Ahmad, Sajjad

363

CBER-DETR Nevada Coincident and Leading Employment Both Indexes Drop for Second Month  

E-Print Network [OSTI]

the seasonally adjusted data reported by the Bureau of Labor Statistics. The Nevada Coincident Employment IndexCBER-DETR Nevada Coincident and Leading Employment Indexes1 Both Indexes Drop for Second Month The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using an index

Ahmad, Sajjad

364

CBER-DETR Nevada Coincident and Leading Employment Bumps in the Road of Recovery  

E-Print Network [OSTI]

the seasonally adjusted data reported by the Bureau of Labor Statistics. The Nevada Coincident Employment IndexCBER-DETR Nevada Coincident and Leading Employment Indexes1 Bumps in the Road of Recovery The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using an index

Ahmad, Sajjad

365

CBER-DETR Nevada Coincident and Leading Employment Anyone for a Double Dip?  

E-Print Network [OSTI]

Statistics. The Nevada Coincident Employment Index includes four employment measures ­ household employmentCBER-DETR Nevada Coincident and Leading Employment Indexes1 Anyone for a Double Dip? The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using an index of employment

Ahmad, Sajjad

366

CBER-DETR Nevada Coincident and Leading Employment Recovery Continues Down the Long Road Back  

E-Print Network [OSTI]

the seasonally adjusted data reported by the Bureau of Labor Statistics. The Nevada Coincident Employment IndexCBER-DETR Nevada Coincident and Leading Employment Indexes1 Recovery Continues Down the Long Road Back The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using

Ahmad, Sajjad

367

CBER-DETR Nevada Coincident and Leading Employment Coincident Index Rises, Leading Index Pauses  

E-Print Network [OSTI]

the seasonally adjusted data reported by the Bureau of Labor Statistics. The Nevada Coincident Employment IndexCBER-DETR Nevada Coincident and Leading Employment Indexes1 Coincident Index Rises, Leading Index Pauses The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using

Ahmad, Sajjad

368

The Nevada railroad system: Physical, operational, and accident characteristics  

SciTech Connect (OSTI)

This report provides a description of the operational and physical characteristics of the Nevada railroad system. To understand the dynamics of the rail system, one must consider the system`s physical characteristics, routing, uses, interactions with other systems, and unique operational characteristics, if any. This report is presented in two parts. The first part is a narrative description of all mainlines and major branchlines of the Nevada railroad system. Each Nevada rail route is described, including the route`s physical characteristics, traffic type and volume, track conditions, and history. The second part of this study provides a more detailed analysis of Nevada railroad accident characteristics than was presented in the Preliminary Nevada Transportation Accident Characterization Study (DOE, 1990).

NONE

1991-09-01T23:59:59.000Z

369

Closure Report for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Closure Report (CR) has been prepared for the Area 25 Contaminated Waste Dumps (CWD), Corrective Action Unit (CAU) 143 in accordance with the Federal Facility Agreement and Consent Order [FFACO] (FFACO, 1996) and the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) for CAU 143: Area 25, Contaminated Waste Dumps, Nevada Test Site, Nevada. CAU 143 consists of two Corrective Action Sites (CASs): 25-23-09 CWD No.1, and 25-23-03 CWD No.2. The Area 25 CWDs are historic disposal units within the Area 25 Reactor Maintenance, Assembly, and Disassembly (R-MAD), and Engine Maintenance, Assembly, and Disassembly (E-MAD) compounds located on the Nevada Test Site (NTS). The R-MAD and E-MAD facilities originally supported a portion of the Nuclear Rocket Development Station in Area 25 of the NTS. CWD No.1 CAS 25-23-09 received solid radioactive waste from the R-MAD Compound (East Trestle and West Trench Berms) and 25-23-03 CWD No.2 received solid radioactive waste from the E-MAD Compound (E-MAD Trench).

D. S. Tobiason

2002-03-01T23:59:59.000Z

370

Complete Bouguer gravity map of the Nevada Test Site and vicinity, Nevada  

SciTech Connect (OSTI)

About 15,000 gravity stations were used to create the gravity map. Gravity studies at the Nevada Test Site were undertaken to help locate geologically favorable areas for underground nuclear tests and to help characterize potential high-level nuclear waste storage sites. 48 refs. (TEM)

Healey, D.L.; Harris, R.N.; Ponce, D.A.; Oliver, H.W.

1987-12-31T23:59:59.000Z

371

Corrective Action Plan for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 151, Septic Systems and Discharge Area, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 151 consists of eight Corrective Action Sites (CASs) located in Areas 2, 12, and 18 of the Nevada Test Site (NTS), which is located approximately 65 miles northwest of Las Vegas, Nevada.

NSTec Environmental Restoration

2007-03-01T23:59:59.000Z

372

Closure Report for Corrective Action Unit 124, Storage Tanks, Nevada Test Site, Nevada with Errata Sheet, Revision 0  

SciTech Connect (OSTI)

This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 124, Storage Tanks, Nevada Test Site (NTS), Nevada. This report complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended January 2007). This CR provides documentation and justification for the closure of CAU 124 without further corrective action. This justification is based on process knowledge and the results of the investigative activities conducted in accordance with the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 124: Storage Tanks, Nevada Test Site, Nevada (NNSA/NSO, 2007). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. Therefore, this information will not be repeated in this CR.

Alfred Wickline

2008-01-01T23:59:59.000Z

373

Nevada Water Resources Research Institute Annual Technical Report  

E-Print Network [OSTI]

Deposition, Toxic Substances, Groundwater Descriptors: Principal Investigators: William H Albright of copper ore at the Yerington NV mine site was accomplished by leaching with sulfuric acid. Residual materials, both solid residual ore and process fluids, pose considerable hazard to the local environment

374

TS Power Plant, Eureka County, Nevada  

SciTech Connect (OSTI)

Not all coal-fired power plants are constructed by investor-owned utilities or independent power producers selling to wholesale markets. When Newmont Mining Corp. recognised that local power supplies were inadequate and too expensive to meet long-term electricity needs for its major gold- and copper-mining operations in northern Nevada, it built its own generation. What is more, Newmont's privately owned 200-MW net coal-fired plant features power plant technologies that will surely become industry standards. Newmont's investment in power and technology is also golden: the capital cost will be paid back in about eight years. 4 figs.

Peltier, R. [DTE Energy Services (United States)

2008-10-15T23:59:59.000Z

375

Nevada/Wind Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte3InformationofServicesNeuCo IncWorkNevada Jump to: navigation,

376

Categorical Exclusion Determinations: Nevada | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTie Ltd:JuneNovember 26,Energy Service CenterNebraskaNevada

377

Nevada National Security Site | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalanced Scorecard Federal2Energy Second QuarterRate principlesNevada National

378

Nevada Geothermal Area | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergy HealthCommentsAugustNational ScienceEnergyNebraska RecoveryNevada

379

Austin, Nevada: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 EastMaine: EnergyAustin Energy Place: Texas Service Territory: TexasAustin, Nevada:

380

Nevada Test Site Environmental Report 2005  

SciTech Connect (OSTI)

The Nevada Test Site Environmental Report 2005 (NTSER) was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. Its purpose is to (1) report compliance status with environmental standards and requirements, (2) present results of environmental monitoring of radiological and nonradiological effluents, (3) report estimated radiological doses to the public from releases of radioactive material, (4) summarize environmental incidents of noncompliance and actions taken in response to them, (5) describe the NTS Environmental Management System and characterize its performance, and (6) highlight significant environmental programs and efforts.

Cathy A. Wills

2006-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Nevada Power Co | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Powerstories onFocus AreaDataBusPFAN) | Open EnergyServices[1]SNV) JumpNevada

382

Energy Incentive Programs, Nevada | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQBusinessin Jamaica,Idaho EnergyMontana Energy IncentiveNevada

383

Nevada Division of Minerals | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's HeatMexico: EnergyMithunCenter Jump to:2 Jump to:Minerals Name: Nevada

384

Nevada State Clearinghouse | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's HeatMexico: EnergyMithunCenter Jump to:2 Jump to:Minerals Name:Nevada State

385

Nevada State Environmental Commission | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's HeatMexico: EnergyMithunCenter Jump to:2 Jump to:Minerals Name:Nevada

386

Nevada, Texas: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's HeatMexico: EnergyMithunCenter Jump to:2 Jump to:MineralsNevada, Texas: Energy

387

Nevada/Incentives | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's HeatMexico: EnergyMithunCenter Jump to:2 Jump to:MineralsNevada, Texas:

388

Sierra Nevada Solar | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g Grant ofRichardton AbbeyARaftPadomaSierra Leone) Jump to:Sierra Nevada

389

DOE - Office of Legacy Management -- Nevada  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof Energy AMDCoal_Budget_Fact_Sheet.pdf More +KentuckyNevada

390

Paradise, Nevada: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth'sOklahoma/GeothermalOrange County isParadise, Nevada: Energy Resources Jump to:

391

Winnemucca, Nevada: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:SeadovCooperative JumpWilliamson County,Bay, OR) JumpPhotoSouthWing,Winneconne,Nevada:

392

Nevada National Security Site-Directed Research  

Office of Scientific and Technical Information (OSTI)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinan antagonist Journal Article: CrystalFG36-08GO18149 Revision: - Date: 06/15/10 ABENGOANRELu547 NewNevada

393

Alternative Fuels Data Center: Nevada Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAbout theOFFICE OFFuels inGoIndiana Natural Gas PowersNevada

394

Journey to the Nevada Test Site Radioactive Waste Management Complex  

ScienceCinema (OSTI)

Journey to the Nevada Test Site Radioactive Waste Management Complex begins with a global to regional perspective regarding the location of low-level and mixed low-level waste disposal at the Nevada Test Site. For decades, the Nevada National Security Site (NNSS) has served as a vital disposal resource in the nation-wide cleanup of former nuclear research and testing facilities. State-of-the-art waste management sites at the NNSS offer a safe, permanent disposal option for U.S. Department of Energy/U.S. Department of Defense facilities generating cleanup-related radioactive waste.

None

2014-10-28T23:59:59.000Z

395

Nevada National Security Site Environmental Report 2010  

SciTech Connect (OSTI)

This NNSSER was prepared to satisfy DOE Order DOE O 231.1B, “Environment, Safety and Health Reporting.” Its purpose is to (1) report compliance status with environmental standards and requirements, (2) present results of environmental monitoring of radiological and nonradiological effluents, (3) report estimated radiological doses to the public from releases of radioactive material, (4) summarize environmental incidents of noncompliance and actions taken in response to them, (5) describe the NNSA/NSO Environmental Management System and characterize its performance, and (6) highlight significant environmental programs and efforts. This NNSSER summarizes data and compliance status for calendar year 2010 at the Nevada National Security Site (NNSS) (formerly the Nevada Test Site) and its two support facilities, the North Las Vegas Facility (NLVF) and the Remote Sensing Laboratory–Nellis (RSL-Nellis). It also addresses environmental restoration (ER) projects conducted at the Tonopah Test Range (TTR). Through a Memorandum of Agreement, NNSA/NSO is responsible for the oversight of TTR ER projects, and the Sandia Site Office of NNSA (NNSA/SSO) has oversight of all other TTR activities. NNSA/SSO produces the TTR annual environmental report available at http://www.sandia.gov/news/publications/environmental/index.html.

C. Wills, ed.

2011-09-13T23:59:59.000Z

396

STRUCTURE OF PRESSURE PULSES IN LIQUIDS WITH GAS BUBBLES N.V. Malykh, I.A. 0G0R0DNIK0V  

E-Print Network [OSTI]

are predominant. This leads to the sound speed dispersion and determines either the short pulse structure oriSTRUCTURE OF PRESSURE PULSES IN LIQUIDS WITH GAS BUBBLES N.V. Malykh, I.A. 0G0R0DNIK0V Institute. I.-INTRODUCTION - The main specific feature of a liquide with gas bubbles is the great difference

Paris-Sud XI, Université de

397

Annual Waste Minimization Summary Report, Calendar Year 2010, U.S. Environmental Protection Agency Identification No. NV3890090001  

SciTech Connect (OSTI)

This report summarizes the waste minimization efforts undertaken by National Security TechnoIogies, LLC, for the U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), during calendar year 2010. The NNSA/NSO Pollution Prevention Program establishes a process to reduce the volume and toxicity of waste generated by NNSA/NSO activities and ensures that proposed methods of treatment, storage, and/or disposal of waste minimize potential threats to human health and the environment.

Haworth, D.M.

2011-01-30T23:59:59.000Z

398

Closure Report for Corrective Action Unit 465: Hydronuclear Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

The corrective action sites (CASs) within CAU 465 are located within Areas 6 and 27 of the NNSS. CAU 465 comprises the following CASs: • 00-23-01, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie site. • 00-23-02, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Dog site. • 00-23-03, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie Prime and Anja sites. • 06-99-01, Hydronuclear, located in Area 6 of the NNSS and known as the Trailer 13 site. The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 465 were met. From September 2011 through July 2012, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 465: Hydronuclear, Nevada National Security Site, Nevada.

Mark Burmeister and Patrick Matthews

2012-11-01T23:59:59.000Z

399

Facility Closure Report for Tunnel U16a, Area 16, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

U16a is not listed in the Federal Facility Agreement and Consent Order. The closure of U16a was sponsored by the Defense Threat Reduction Agency (DTRA) and performed with the cooperation of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office and the Nevada Division of Environmental Protection. This report documents closure of this site as identified in the DTRA Fiscal Year 2008 Statement of Work, Task 6.3. Closure activities included: · Removing and disposing of a shack and its contents · Disposing of debris from within the shack and in the vicinity of the tunnel entrance · Verifying that the tunnel is empty · Welding screened covers over tunnel vent holes to limit access and allow ventilation · Constructing a full-tunnel cross-section fibercrete bulkhead to prevent access to the tunnel Field activities were conducted from July to August 2008.

NSTec Environmental Restoration

2009-07-01T23:59:59.000Z

400

Facility Closure Report for T-Tunnel (U12t), Area 12, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Facility Closure Report (FCR) has been prepared to document the actions taken to permanently close the remaining accessible areas of U12t-Tunnel (T-Tunnel) in Area 12 of the Nevada Test Site (NTS). The closure of T-Tunnel was a prerequisite to transfer facility ownership from the Defense Threat Reduction Agency (DTRA) to the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). Closure of the facility was accomplished with the cooperation and concurrence of both NNSA/NSO and the Nevada Division of Environmental Protection (NDEP). The purpose of this FCR is to document that the closure of T-Tunnel complied with the closure requirements specified in the Facility Closure Plan for N- and T-Tunnels Area 12, Nevada Test Site (Appendix D) and that the facility is ready for transfer to NNSA/NSO. The Facility Closure Plan (FCP) is provided in Appendix D. T-Tunnel is located approximately 42 miles north of Mercury in Area 12 of the NTS (Figure 1). Between 1970 and 1987, T-Tunnel was used for six Nuclear Weapons Effects Tests (NWETs). The tunnel was excavated horizontally into the volcanic tuffs of Rainier Mesa. The T-Tunnel complex consists of a main access drift with two NWET containment structures, a Gas Seal Plug (GSP), and a Gas Seal Door (GSD) (Figure 2). The T-Tunnel complex was mothballed in 1993 to preserve the tunnel for resumption of testing, should it happen in the future, to stop the discharge of tunnel effluent, and to prevent unauthorized access. This was accomplished by sealing the main drift GSD.

NSTec Environmental Restoration

2008-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 543, Liquid Disposal Units, is listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996. CAU 543 consists of seven Corrective Action Sites (CASs) located in Areas 6 and 15 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 543 consists of the following seven CASs: {sm_bullet} CAS 06-07-01, Decon Pad {sm_bullet} CAS 15-01-03, Aboveground Storage Tank {sm_bullet} CAS 15-04-01, Septic Tank {sm_bullet} CAS 15-05-01, Leachfield {sm_bullet} CAS 15-08-01, Liquid Manure Tank {sm_bullet} CAS 15-23-01, Underground Radioactive Material Area {sm_bullet} CAS 15-23-03, Contaminated Sump, Piping From January 24, 2005 through April 14, 2005, CAU 543 site characterization activities were conducted, and are reported in Appendix A of the CAU 543 Corrective Action Decision Document (CADD) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2005). The recommended corrective action as stated in the approved CADD is No Further Action for five of the CAU 543 CASs, and Closure In Place for the remaining two CASs.

NSTec Environmental Restoration

2006-09-01T23:59:59.000Z

402

Supplemental Investigation Plan for FFACO Use Restrictions, Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This document is part of an effort to re-evaluate all FFACO URs against the current RBCA criteria (referred to in this document as the Industrial Sites [IS] RBCA process) as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006a). After reviewing all of the existing FFACO URs, the 12 URs addressed in this Supplemental Investigation Plan (SIP) could not be evaluated against the current RBCA criteria as sufficient information about the contamination at each site was not available. This document presents the plan for conducting field investigations to obtain the needed information. This SIP includes URs from Corrective Action Units (CAUs) 326, 339, 358, 452, 454, 464, and 1010, located in Areas 2, 6, 12, 19, 25, and 29 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada; and CAU 403, located in Area 3 of the Tonopah Test Range, which is approximately 165 miles north of Las Vegas, Nevada.

Lynn Kidman

2008-02-01T23:59:59.000Z

403

Environmental assessment for liquid waste treatment at the Nevada Test Site, Nye County, Nevada  

SciTech Connect (OSTI)

This environmental assessment (EA) examines the potential impacts to the environment from treatment of low-level radioactive liquid and low-level mixed liquid and semi-solid wastes generated at the Nevada Test Site (NTS). The potential impacts of the proposed action and alternative actions are discussed herein in accordance with the National Environmental Policy Act (NEPA) of 1969, as amended in Title 42 U.S.C. (4321), and the US Department of Energy (DOE) policies and procedures set forth in Title 10 Code of Federal Regulations (CFR) Part 1021 and DOE Order 451.1, ``NEPA Compliance Program.`` The potential environmental impacts of the proposed action, construction and operation of a centralized liquid waste treatment facility, were addressed in the Final Environmental Impact Statement for the Nevada Test Site and Off-Site Locations in the State of Nevada. However, DOE is reevaluating the need for a centralized facility and is considering other alternative treatment options. This EA retains a centralized treatment facility as the proposed action but also considers other feasible alternatives.

NONE

1997-01-01T23:59:59.000Z

404

Closure Report for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Closure Report (CR) documents closure activities for Corrective Action Unit (CAU) 543, Liquid Disposal Units, according to the Federal Facility Agreement and Consent Order (FFACO, 1996) and the Corrective Action Plan (CAP) for CAU 543 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2007). CAU 543 is located at the Nevada Test Site (NTS), Nevada (Figure 1), and consists of the following seven Corrective Action Sites (CASs): CAS 06-07-01, Decon Pad; CAS 15-01-03, Aboveground Storage Tank; CAS 15-04-01, Septic Tank; CAS 15-05-01, Leachfield; CAS 15-08-01, Liquid Manure Tank; CAS 15-23-01, Underground Radioactive Material Area; CAS 15-23-03, Contaminated Sump, Piping; and CAS 06-07-01 is located at the Decontamination Facility in Area 6, adjacent to Yucca Lake. The remaining CASs are located at the former U.S. Environmental Protection Agency (EPA) Farm in Area 15. The purpose of this CR is to provide a summary of the completed closure activities, to document waste disposal, and to present analytical data confirming that the remediation goals were met. The closure alternatives consisted of closure in place for two of the CASs, and no further action with implementation of best management practices (BMPs) for the remaining five CASs.

NSTec Environmental Restoration

2008-01-01T23:59:59.000Z

405

On the benefits of an integrated nuclear complex for Nevada  

SciTech Connect (OSTI)

An integrated nuclear complex is proposed for location at the Nevada Test Site. In addition to solving the nuclear waste disposal problem, this complex would tremendously enhance the southern Nevada economy, and it would provide low cost electricity to each resident and business in the affected counties. Nuclear industry and the national economy would benefit because the complex would demonstrate the new generation of safer nuclear power plants and revitalize the industry. Many spin-offs of the complex would be possible, including research into nuclear fusion and a world class medical facility for southern Nevada. For such a complex to become a reality, the cycle of distrust between the federal government and the State of Nevada must be broken. The paper concludes with a discussion of implementation through a public process led by state officials and culminating in a voter referendum.

Blink, J.A. [Lawrence Livermore National Laboratory, Las Vegas, NV (United States); Halsey, W.G. [Lawrence Livermore National Lab., CA (United States)

1994-01-01T23:59:59.000Z

406

Factors controlling tungsten concentrations in ground water, Carson Desert, Nevada  

E-Print Network [OSTI]

Factors controlling tungsten concentrations in ground water, Carson Desert, Nevada Ralph L. Seiler sources. Tungsten concentrations in 100 ground water samples from all aquifers used as drinking water indicates that W exhibits Tungsten con- centrations are strongly and positively correlated

407

Western Red-tailed Skink Distribution in Southern Nevada  

SciTech Connect (OSTI)

This slide show reports a study to: determine Western Red-tailed Skink (WRTS) distribution on Nevada National Security Site (NNSS); identify habitat where WRTS occur; learn more about WRTS natural history; and document distribution of other species.

Hall, D. B. and Gergor, P. D.

2011-11-01T23:59:59.000Z

408

Why Is Nevada in Hot Water? Structural Controls and Tectonic...  

Open Energy Info (EERE)

to the northwest in west-central Nevada near the southeast margin of the high heat-flow region. The abundant geothermal fields may therefore result from a transfer of...

409

NEVADA SPARKS RESIDENTS TO IMPROVE ENERGY FITNESS | Department...  

Energy Savers [EERE]

and Sparks, Nevada. The program's goals included creating the foundation for a self-sustaining program that would help the state meet its goal to upgrade 5% of all...

410

Nevada National Security Site Underground Test Area (UGTA) Flow...  

Office of Environmental Management (EM)

December 12, 2014 To view all the P&RA CoP 2014 Technical Exchange Meeting videos click here. Video Presentation Nevada National Security Site Underground Test Area...

411

Subsurface Electrical Measurements at Dixie Valley, Nevada, Using...  

Open Energy Info (EERE)

Subsurface Electrical Measurements at Dixie Valley, Nevada, Using Single-Well and Surface-to-Well Induction Logging Jump to: navigation, search OpenEI Reference LibraryAdd to...

412

EA-1136: Double Tracks Test Site, Nye County, Nevada  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of the proposal for the U.S. Department of Energy Nevada Operations Office to conduct environmental restoration operations at the Double Tracks test site...

413

DOE Offers Loan Guarantees to Geothermal Projects in Nevada and...  

Broader source: Energy.gov (indexed) [DOE]

is the developer of Faulkner 1, a 49.5-megawatt (MW) geothermal power project at NGP's Blue Mountain site in northwestern Nevada. DOE is acting as loan guarantor for up to 80% of...

414

Nevada low-temperaure geothermal resource assessment: 1994. Final report  

SciTech Connect (OSTI)

Data compilation for the low-temperature program is being done by State Teams in two western states. Final products of the study include: a geothermal database, in hardcopy and as digital data (diskette) listing information on all known low- and moderate- temperature springs and wells in Nevada; a 1:1,000,000-scale map displaying these geothermal localities, and a bibliography of references on Nevada geothermal resources.

Garside, L.J.

1994-12-31T23:59:59.000Z

415

Phase I Hydrologic Data for the Groundwater Flow and Contaminant Transport Model of Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada Test Site, Nye County, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Underground Test Area (UGTA) Project to assess and evaluate the effects of the underground nuclear weapons tests on groundwater beneath the Nevada Test Site (NTS) and vicinity. The framework for this evaluation is provided in Appendix VI, Revision No. 1 (December 7, 2000) of the Federal Facility Agreement and Consent Order (FFACO, 1996). Section 3.0 of Appendix VI ''Corrective Action Strategy'' of the FFACO describes the process that will be used to complete corrective actions specifically for the UGTA Project. The objective of the UGTA corrective action strategy is to define contaminant boundaries for each UGTA corrective action unit (CAU) where groundwater may have become contaminated from the underground nuclear weapons tests. The contaminant boundaries are determined based on modeling of groundwater flow and contaminant transport. A summary of the FFACO corrective action process and the UGTA corrective action strategy is provided in Section 1.5. The FFACO (1996) corrective action process for the Yucca Flat/Climax Mine CAU 97 was initiated with the Corrective Action Investigation Plan (CAIP) (DOE/NV, 2000a). The CAIP included a review of existing data on the CAU and proposed a set of data collection activities to collect additional characterization data. These recommendations were based on a value of information analysis (VOIA) (IT, 1999), which evaluated the value of different possible data collection activities, with respect to reduction in uncertainty of the contaminant boundary, through simplified transport modeling. The Yucca Flat/Climax Mine CAIP identifies a three-step model development process to evaluate the impact of underground nuclear testing on groundwater to determine a contaminant boundary (DOE/NV, 2000a). The three steps are as follows: (1) Data compilation and analysis that provides the necessary modeling data that is completed in two parts: the first addressing the groundwater flow model, and the second the transport model. (2) Development of a groundwater flow model. (3) Development of a groundwater transport model. This report presents the results of the first part of the first step, documenting the data compilation, evaluation, and analysis for the groundwater flow model. The second part, documentation of transport model data will be the subject of a separate report. The purpose of this document is to present the compilation and evaluation of the available hydrologic data and information relevant to the development of the Yucca Flat/Climax Mine CAU groundwater flow model, which is a fundamental tool in the prediction of the extent of contaminant migration. Where appropriate, data and information documented elsewhere are summarized with reference to the complete documentation. The specific task objectives for hydrologic data documentation are as follows: (1) Identify and compile available hydrologic data and supporting information required to develop and validate the groundwater flow model for the Yucca Flat/Climax Mine CAU. (2) Assess the quality of the data and associated documentation, and assign qualifiers to denote levels of quality. (3) Analyze the data to derive expected values or spatial distributions and estimates of the associated uncertainty and variability.

John McCord

2006-06-01T23:59:59.000Z

416

Errata Sheet for the Closure Report for Corrective Action Unit 528  

SciTech Connect (OSTI)

Errata sheet for DOE/NV--1165, "Closure Report for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada," Revision 0

NSTec Environmental Restoration

2009-06-08T23:59:59.000Z

417

Energy Portfolio Standard  

Broader source: Energy.gov [DOE]

Nevada established a renewable portfolio standard (RPS) as part of its 1997 restructuring legislation. Under the standard, NV Energy (formerly Nevada Power and Sierra Pacific Power) must use...

418

Detailed Geophysical Fault Characterization in Yucca Flat, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Yucca Flat is a topographic and structural basin in the northeastern part of the Nevada Test Site (NTS) in Nye County, Nevada. Between the years 1951 and 1992, 659 underground nuclear tests took place in Yucca Flat; most were conducted in large, vertical excavations that penetrated alluvium and the underlying Cenozoic volcanic rocks. Radioactive and other potential chemical contaminants at the NTS are the subject of a long-term program of investigation and remediation by the U.S. Department of Energy (DOE), National Nuclear Security Administration, Nevada Site Office, under its Environmental Restoration Program. As part of the program, the DOE seeks to assess the extent of contamination and to evaluate the potential risks to humans and the environment from byproducts of weapons testing. To accomplish this objective, the DOE Environmental Restoration Program is constructing and calibrating a ground-water flow model to predict hydrologic flow in Yucca Flat as part of an effort to quantify the subsurface hydrology of the Nevada Test Site. A necessary part of calibrating and evaluating a model of the flow system is an understanding of the location and characteristics of faults that may influence ground-water flow. In addition, knowledge of fault-zone architecture and physical properties is a fundamental component of the containment of the contamination from underground nuclear tests, should such testing ever resume at the Nevada Test Site. The goal of the present investigation is to develop a detailed understanding of the geometry and physical properties of fault zones in Yucca Flat. This study was designed to investigate faults in greater detail and to characterize fault geometry, the presence of fault splays, and the fault-zone width. Integrated geological and geophysical studies have been designed and implemented to work toward this goal. This report describes the geophysical surveys conducted near two drill holes in Yucca Flat, the data analyses performed, and the integrated interpretations developed from the suite of geophysical methodologies utilized in this investigation. Data collection for this activity started in the spring of 2005 and continued into 2006. A suite of electrical geophysical surveys were run in combination with ground magnetic surveys; these surveys resulted in high-resolution subsurface data that portray subsurface fault geometry at the two sites and have identified structures not readily apparent from surface geologic mapping, potential field geophysical data, or surface effects fracture maps.

Theodore H. Asch; Donald Sweetkind; Bethany L. Burton; Erin L. Wallin

2009-02-10T23:59:59.000Z

419

Characterizing Structural Controls of EGS-Candidate and Conventional...  

Open Energy Info (EERE)

EGS sites. Awardees (Company Institution) Great Basin Center for Geothermal Energy, University of Nevada, Reno Legal Name of Awardee Board of Regents, NSHE, on behalf of UNR...

420

Truckee Meadows Community College and Colorado School of Mines...  

Broader source: Energy.gov (indexed) [DOE]

student teams-from Truckee Meadows Community College in Reno, Nevada and Colorado School of Mines in Denver, Colorado-demonstrated exceptional rigor in their research and...

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Energy Department Addresses Largest Gathering of Geothermal Energy...  

Broader source: Energy.gov (indexed) [DOE]

Resources Council (GRC) in Reno, Nevada-the industry's largest annual gathering of geothermal energy stakeholders in the nation. In his keynote address, Hollett discussed...

422

CALIFORNIA SOLAR DATA MANUAL  

E-Print Network [OSTI]

for Reno, Nevada . . . . . (Q) Solar Data for China Lake/using Nominal Solar Profiles China Lake/Inyokern ANGLE OFStations - China Lake, Edwards Monthly Latitude: Jan SOLAR

Berdahl, P.

2010-01-01T23:59:59.000Z

423

Summer 2012 National Geothermal Academy: Applications Due February...  

Broader source: Energy.gov (indexed) [DOE]

Academy is proud to present an intensive summer course in all aspects of geothermal energy development and utilization, held at the University of Nevada, Reno campus. The...

424

E-Print Network 3.0 - aluminum Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

thermal conductivity. An increase in ... Source: Wirtz, Richard A. - Department of Mechanical Engineering, University of Nevada, Reno Collection: Engineering 52 The Role of...

425

Nevada National Security Site Groundwater Program  

ScienceCinema (OSTI)

From 1951 to 1992, the Unites States government conducted 828 underground nuclear tests at the Nevada National Security Site. About one-third of these tests occurred near, below or within the water table - the very top portion of the groundwater layer where rock and soil are completely saturated with water. As a result, some groundwater was contaminated. The U.S. Department of Energy (DOE) began exploring the effects of groundwater contamination in the 1970s. Though contamination from underground testing has never been detected on public land, the DOE was committed to developing an advanced, reliable monitoring network that ensures the long-term protection of the public. An intensive groundwater investigation program was launched in 1989.

None

2014-10-28T23:59:59.000Z

426

National Uranium Resource Evaluation, Tonopah quadrangle, Nevada  

SciTech Connect (OSTI)

The Tonopah Quadrangle, Nevada, was evaluated using National Uranium Resource Evaluation criteria to identify and delineate areas favorable for uranium deposits. Investigations included reconnaissance and detailed surface geologic and radiometric studies, geochemical sampling and evaluation, analysis and ground-truth followup of aerial radiometric and hydrogeochemical and stream-sediment reconnaissance data, and subsurface data evaluation. The results of these investigations indicate environments favorable for hydroallogenic uranium deposits in Miocene lacustrine sediments of the Big Smoky Valley west of Tonopah. The northern portion of the Toquima granitic pluton is favorable for authigenic uranium deposits. Environments considered unfavorable for uranium deposits include Quaternary sediments; intermediate and mafic volcanic and metavolcanic rocks; Mesozoic, Paleozoic, and Precambrian sedimentary and metasedimentary rocks; those plutonic rocks not included within favorable areas; and those felsic volcanic rocks not within the Northumberland and Mount Jefferson calderas.

Hurley, B W; Parker, D P

1982-04-01T23:59:59.000Z

427

Corrective Action Investigation Plan for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada National Security Site, Nevada with ROTCs 1, 2, and 3 (Revision 0, September 2000)  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) approach to collect the data necessary to evaluate Corrective Action Alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 97 under the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 97, collectively known as the Yucca Flat/Climax Mine CAU, consists of 720 Corrective Action Sites (CASs). The Yucca Flat/Climax Mine CAU extends over several areas of the NTS and constitutes one of several areas used for underground nuclear testing in the past. The nuclear tests resulted in groundwater contamination in the vicinity as well as downgradient of the underground test areas. Based on site history, the Yucca Flat underground nuclear tests were conducted in alluvial, volcanic, and carbonate rocks; whereas, the Climax Mine tests were conducted in an igneous intrusion located in northern Yucca Flat. Particle-tracking simulations performed during the regional evaluation indicate that the local Climax Mine groundwater flow system merges into the much larger Yucca Flat groundwater flow systems during the 1,000-year time period of interest. Addressing these two areas jointly and simultaneously investigating them as a combined CAU has been determined the best way to proceed with corrective action investigation (CAI) activities. The purpose and scope of the CAI includes characterization activities and model development conducted in five major sequential steps designed to be consistent with FFACO Underground Test Area Project's strategy to predict the location of the contaminant boundary, develop and implement a corrective action, and close each CAU. The results of this field investigation will support a defensible evaluation of CAAs in the subsequent corrective action decision document.

Andrews, Robert; Marutzky, Sam

2000-09-01T23:59:59.000Z

428

Nevada National Security Site Radiation Protection Program  

SciTech Connect (OSTI)

Title 10 Code of Federal Regulations (CFR) Part 835, “Occupational Radiation Protection,” establishes radiation protection standards, limits, and program requirements for protecting individuals from ionizing radiation resulting from the conduct of U.S. Department of Energy (DOE) activities. 10 CFR 835.101(a) mandates that DOE activities be conducted in compliance with a documented Radiation Protection Program (RPP) as approved by DOE. This document promulgates the RPP for the Nevada National Security Site (NNSS), related (on-site or off-site) U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) operations, and environmental restoration off-site projects. This RPP section consists of general statements that are applicable to the NNSS as a whole. The RPP also includes a series of appendices which provide supporting detail for the associated NNSS Tennant Organizations (TOs). Appendix H, “Compliance Demonstration Table,” contains a cross-walk for the implementation of 10 CFR 835 requirements. This RPP does not contain any exemptions from the established 10 CFR 835 requirements. The RSPC and TOs are fully compliant with 10 CFR 835 and no additional funding is required in order to meet RPP commitments. No new programs or activities are needed to meet 10 CFR 835 requirements and there are no anticipated impacts to programs or activities that are not included in the RPP. There are no known constraints to implementing the RPP. No guides or technical standards are adopted in this RPP as a means to meet the requirements of 10 CFR 835.

none,

2013-04-30T23:59:59.000Z

429

Final Report Project Activity Task ORD-FY04-002 Nevada System of Higher Education Quality Assurance Program  

SciTech Connect (OSTI)

The principal purpose of DOE Cooperative Agreement DE-FC28-04RW12232 is to develop and continue providing the public and the U.S. Department of Energy’s (DOE) Office of Civilian Radioactive Waste Management (OCRWM) with an independently derived, unbiased body of scientific and engineering data concerning the study of Yucca Mountain as a potential high-level radioactive waste repository. Under this agreement, the Nevada System of Higher Education (NSHE), formerly the University and Community College System of Nevada (UCCSN), performs scientific or engineering research, and maintains and fosters collaborative working relationships between government and academic researchers. In performing these activities, the NSHE has already developed and implemented a Quality Assurance (QA) program, which was accepted by the DOE Office of Quality Assurance, under the previous Cooperative Agreement Number DE-FC28-98NV12081. The following describes the objectives of Project Activity 002 “Quality Assurance Program” under cooperative agreement DE-FC28-04RW12232. The objective of this QA program was to assure that data produced under the cooperative agreement met the OCRWM QA Requirements and Description (QARD) requirements for quality-affecting (Q) data. The QA Program was written to address specific QARD requirements historically identified and incorporated in Q activities to the degree appropriate for the nature, scope, and complexity of the activity. Additional QARD requirements were integrated into the program when required to complete a specific activity. NSHE QA staff developed a detailed matrix to address each QARD element, identifying the applicable requirements and specifying where each requirement is addressed in the QA program procedures, or identify requirements as “not applicable” to the QA program. Controlled documents were prepared in the form of QA procedures (QAPs) and implementing procedures (IPs). NSHE identified new QAPs and IPs when needed. NSHE PIs implemented the QA program and completed individual research project activities. PIs were also responsible for developing implementing procedures, conducting technical training, assuring that the QA program training was acquired by all task personnel, and participating in monitoring the QA program control for each individual research project activity. This project activity, which was an essential part of the program to enhance the collaborative ongoing research between the NSHE and ORD, was intended to support all quality-affecting activities funded during the five-year period of the cooperative agreement. However, the cooperative agreement was down-graded to non quality-affecting after 4 years.

Smiecinski, Amy; Keeler, Raymond; Bertoia, Julie; Mueller, Terry; Roosa, Morris; Roosa, Barbara

2008-03-07T23:59:59.000Z

430

Laboratory and Field Studies Related to Radionuclide Migration at the Nevada Test Site  

SciTech Connect (OSTI)

In this report, we describe the work done in FY 1998 at Los Alamos National Laboratory as part of the Hydrologic Resources Management Program (HRMA) funded by the Nevada Operations Office of the US Department of Energy (DOE/NV). The major part of our research effort was to measure radionuclides present in water or soil samples collected from near nuclear tests. We report our measurements for materials collected in both saturated and unsaturated horizons adjacent to nuclear test cavities or collapse chimneys and from within several cavities. Soil samples collected from above the cavities formed by the Halfbeak, Jerboa, and Bobac tests contained no radioactivity, although a test similar to Bobac in the same area had been contaminated with {sup 137}Cs. Water samples from near the Shoal test contained no measurable radionuclides, whereas those from near Faultless and Aleman had concentrations similar to previous measurements. Water from the Tybo-Benham site was similar to earlier collections at that site; this year, we added {sup 241}Am to the list of radionuclides measured at this location. Two Bennett pumps in tandem were used to extract water from the piezometer tube in the cavity of the Dalhart event. This extraction is a significant achievement in that it opens the possibility of purging similar tubes at other locations on the NTS. The Cheshire post shot hole was reconfigured and pumped from two horizons for the first time since mid-1980. We are especially interested in examining water from the level of the working point to determine the hydrologic source term in a cavity filled with groundwater for over 20 years. We devoted much time this year to examining the colloid content of NTS groundwater. After developing protocols for collecting, handling, and storing groundwater samples without altering their colloid content, we analyzed water from the Tybo-Benham and from the Cheshire sites. Whereas the colloid concentration did not vary much with depth at Tybo-Benham, there were 20 times more colloids in groundwater from the Cheshire cavity than were found a few hundred meters higher. Electron micrographs show the wide variety of colloid sizes and shapes present in NTS groundwater. Our experiences with filtration of groundwater samples illustrate the difficulties of colloid size characterization using this methodology. Our report ends with a description of our consultative and educational activities and a list of recent publications.

B. A. Martinez; D. L. Finnegan; Joseph L. Thompson; K. S. Kung

1999-03-01T23:59:59.000Z

431

Characterization of Microbial Communities in Subsurface Nuclear Blast Cavities of the Nevada Test Site  

SciTech Connect (OSTI)

This exploratory research project is designed to test fundamental hypotheses concerning the possible existence and nature of indigenous microbial populations in Nevada Test Site (NTS) subsurface nuclear blast cavities. Although subsurface microbiological studies have been performed at the NTS in the past, radioactive zones have yet to be addressed. Nuclear blast zone microbiology is a completely new field and our team is well-positioned to collect and analyze samples that have never before been available to microbiologists. Relevant samples are now being obtained by incorporating microbiological collections into an ongoing annual hot well sampling program being conducted by other agencies. A combination of cultivation-based and molecular microbial detection protocols is being utilized at multiple locations to survey for uncultivable microorganisms and to develop a culture collection which will be characterized for radionuclide- and metal-reduction capabilities. Given that redox manipulations mediated by microorganisms can impact the mobility of DOE contaminants, a positive outcome from this work would have significant implications for management strategies at this and other DOE sites. A primary objective of the project has been the establishment of the regulatory and technical framework necessary to enable our acquisition of samples. Thus, much of our activity in the first phase of this work has involved the development an approved Field Area Work Plan (FAWP), Radiological Work Permit (RWP), and other documentation required for radiological work at the NTS. We have also invested significant time into ensuring that all personnel possess the required training (e.g. Radworker II and 40 hr. HAZWOPER) for access to the hot well sampling sites. Laboratory facilities, required for field processing of radioactive samples as well as DNA extraction and other manipulations, have been secured both the NTS (Mercury, NV) and UNLV. Although our year-1 field work was delayed due to non-availability of samples, an aggressive sampling campaign is now underway and our first hot well samples were collected on Feb 5th, 2008. The unique nature of this site, coupled with the combined expertise of the collaborating laboratories (DRI, LLNL, PNNL, and the Harry Reid Center) makes the likelihood of our achieving discoveries of value to DOE, the individual researchers, and society high. As the selective pressures at atomic blast sites are probably different from those of production and disposal sites, these habitats may contain novel organisms of utility for bioremediation. Such organisms will have had to develop physiological mechanisms to survive high doses of ionizing radiation over the variety of rock types and hydrologic environments present at the NTS.

Moser, Duane; Russell, Chuck; Marshall, Matthew; Czerwinski, Ken; Daly, Michael J; Zavarin, Mavrik

2008-02-08T23:59:59.000Z

432

E-Print Network 3.0 - area kgra nevada Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

south-eastern Nevada) is a remote ecosystem... for Mt. Irish, Nevada, Derived from Tree-Ring Records is part of the Poster Session: Climatology... scheduled on Wednesday, 3...

433

E-Print Network 3.0 - areas central nevada Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

south-eastern Nevada) is a remote ecosystem... for Mt. Irish, Nevada, Derived from Tree-Ring Records is part of the Poster Session: Climatology... scheduled on Wednesday, 3...

434

E-Print Network 3.0 - area central nevada Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

south-eastern Nevada) is a remote ecosystem... for Mt. Irish, Nevada, Derived from Tree-Ring Records is part of the Poster Session: Climatology... scheduled on Wednesday, 3...

435

E-Print Network 3.0 - area nevada rev Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

south-eastern Nevada) is a remote ecosystem... for Mt. Irish, Nevada, Derived from Tree-Ring Records is part of the Poster Session: Climatology... scheduled on Wednesday, 3...

436

SECTION 595 WRDA 1999, AS AMENDED IDAHO, MONTANA, RURAL NEVADA, NEW MEXICO,  

E-Print Network [OSTI]

SECTION 595 ­ WRDA 1999, AS AMENDED IDAHO, MONTANA, RURAL NEVADA, NEW MEXICO, RURAL UTAH, rural Nevada, New Mexico, rural Utah, and Wyoming pursuant to Section 595 of the Water Resources

US Army Corps of Engineers

437

SECTION 595 WRDA 1999, AS AMENDED IDAHO, MONTANA, RURAL NEVADA, NEW MEXICO,  

E-Print Network [OSTI]

SECTION 595 ­ WRDA 1999, AS AMENDED IDAHO, MONTANA, RURAL NEVADA, NEW MEXICO, RURAL UTAH-Federal interests in Idaho, Montana, rural Nevada, New Mexico, rural Utah, and Wyoming pursuant to Section 595

US Army Corps of Engineers

438

Archuleta County CO Lineaments  

SciTech Connect (OSTI)

Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Originator: Geothermal Development Associates, Reno, Nevada Publication Date: 2012 Title: Archuleta Lineaments Edition: First Publication Information: Publication Place: Reno Nevada Publisher: Geothermal Development Associates, Reno, Nevada Description: This layer traces apparent topographic and air-photo lineaments in the area around Pagosa springs in Archuleta County, Colorado. It was made in order to identify possible fault and fracture systems that might be conduits for geothermal fluids. Geothermal fluids commonly utilize fault and fractures in competent rocks as conduits for fluid flow. Geothermal exploration involves finding areas of high near-surface temperature gradients, along with a suitable “plumbing system” that can provide the necessary permeability. Geothermal power plants can sometimes be built where temperature and flow rates are high. To do this, georeferenced topographic maps and aerial photographs were utilized in an existing GIS, using ESRI ArcMap 10.0 software. The USA_Topo_Maps and World_Imagery map layers were chosen from the GIS Server at server.arcgisonline.com, using a UTM Zone 13 NAD27 projection. This line shapefile was then constructed over that which appeared to be through-going structural lineaments in both the aerial photographs and topographic layers, taking care to avoid manmade features such as roads, fence lines, and right-of-ways. These lineaments may be displaced somewhat from their actual location, due to such factors as shadow effects with low sun angles in the aerial photographs. Note: This shape file was constructed as an aid to geothermal exploration in preparation for a site visit for field checking. We make no claims as to the existence of the lineaments, their location, orientation, and nature. Spatial Domain: Extent: Top: 4132831.990103 m Left: 311979.997741 m Right: 331678.289280 m Bottom: 4116067.165795 m Contact Information: Contact Organization: Geothermal Development Associates, Reno, Nevada Contact Person: Richard “Rick” Zehner Address: 3740 Barron Way City: Reno State: NV Postal Code: 89511 Country: USA Contact Telephone: 775-737-7806 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System 1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shape file

Zehner, Richard E.

2012-01-01T23:59:59.000Z

439

Washoe Tribe Nevada Inter-Tribal Energy Consortium Energy Organization Enhancement Project Final Report  

SciTech Connect (OSTI)

The Washoe Tribe of Nevada and California was awarded funding from the Department of Energy to complete the Nevada Inter-Tribal Energy Consortium Energy Organization Enhancement Project. The main goal of the project was to enhance the capacity of the Nevada Inter-Tribal Energy Consortium (NITEC) to effectively assist tribes within Nevada to technically manage tribal energy resources and implement tribal energy projects.

Johnson, Jennifer [Washoe Tribe of NV and Ca

2014-11-06T23:59:59.000Z

440

Independent Oversight Review, Nevada Site Office and National Security Technologies, LLC- November 2011  

Broader source: Energy.gov [DOE]

Review of Nevada Site Office and National Security Technologies, LLC, Line Oversight and Contractor Assurance Systems Self-Assessment

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Addendum to the Closure Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Discharge Area, Nevada Test Site, Revision 0  

SciTech Connect (OSTI)

This document constitutes an addendum to the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Discharge Area Nevada Test Site, December 1997 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-19-01, A12 Fleet Ops Steam Cleaning Efflu. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.

Grant Evenson

2009-05-01T23:59:59.000Z

442

CBER-DETR Nevada Coincident and Leading Employment Indexes Show a Pause in the Recovery  

E-Print Network [OSTI]

the Current Employment Statistics (Establishment Survey) back to January 2011. Figure 1 encompasses fourCBER-DETR Nevada Coincident and Leading Employment Indexes1 Indexes Show a Pause in the Recovery The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using an index

Ahmad, Sajjad

443

Closure Report for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activities were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C.

NSTec Environmental Restoration

2008-04-01T23:59:59.000Z

444

Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

NSTec Environmental Restoration

2007-07-01T23:59:59.000Z

445

Closure Report for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada  

SciTech Connect (OSTI)

This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 562, Waste Systems, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 562 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 562 consists of the following 13 Corrective Action Sites (CASs), located in Areas 2, 23, and 25 of the Nevada National Security Site: · CAS 02-26-11, Lead Shot · CAS 02-44-02, Paint Spills and French Drain · CAS 02-59-01, Septic System · CAS 02-60-01, Concrete Drain · CAS 02-60-02, French Drain · CAS 02-60-03, Steam Cleaning Drain · CAS 02-60-04, French Drain · CAS 02-60-05, French Drain · CAS 02-60-06, French Drain · CAS 02-60-07, French Drain · CAS 23-60-01, Mud Trap Drain and Outfall · CAS 23-99-06, Grease Trap · CAS 25-60-04, Building 3123 Outfalls Closure activities began in October 2011 and were completed in April 2012. Activities were conducted according to the Corrective Action Plan for CAU 562 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste and hazardous waste. Some wastes exceeded land disposal limits and required offsite treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite or offsite landfills. NNSA/NSO requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 562 · The transfer of CAU 562 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO

NSTec Environmental Restoration

2012-08-15T23:59:59.000Z

446

CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 204: STORAGE BUNKERS, NEVADA TEST SITE, NEVADA  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 330 consists of four Corrective Action Sites (CASs) located in Areas 6, 22, and 23 of the Nevada Test Site (NTS). The unit is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) as CAU 330: Areas 6, 22, and 23 Tanks and Spill Sites. CAU 330 consists of the following CASs: CAS 06-02-04, Underground Storage Tank (UST) and Piping CAS 22-99-06, Fuel Spill CAS 23-01-02, Large Aboveground Storage Tank (AST) Farm CAS 23-25-05, Asphalt Oil Spill/Tar Release

NONE

2006-04-01T23:59:59.000Z

447

Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 543: Liquid Disposal Units is listed in Appendix III of the ''Federal Facility Agreement and Consent Order'' (FFACO) which was agreed to by the state of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (FFACO, 1996). CAU 543 sites are located in Areas 6 and 15 of the Nevada Test Site (NTS), which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 543 consists of the following seven Corrective Action Sites (CASs) (Figure 1): CAS 06-07-01, Decon Pad; CAS 15-01-03, Aboveground Storage Tank; CAS 15-04-01, Septic Tank; CAS 15-05-01, Leachfield; CAS 15-08-01, Liquid Manure Tank; CAS 15-23-01, Underground Radioactive Material Area; and CAS 15-23-03, Contaminated Sump, Piping. All Area 15 CASs are located at the former U.S. Environmental Protection Agency (EPA) Farm, which operated from 1963 to 1981 and was used to support animal experiments involving the uptake of radionuclides. Each of the Area 15 CASs, except CAS 15-23-01, is associated with the disposal of waste effluent from Building 15-06, which was the primary location of the various tests and experiments conducted onsite. Waste effluent disposal from Building 15-06 involved piping, sumps, outfalls, a septic tank with leachfield, underground storage tanks, and an aboveground storage tank (AST). CAS 15-23-01 was associated with decontamination activities of farm equipment potentially contaminated with radiological constituents, pesticides, and herbicides. While the building structures were removed before the investigation took place, all the original tanks, sumps, piping, and concrete building pads remain in place. The Area 6 CAS is located at the Decontamination Facility in Area 6, a facility which operated from 1971 to 2001 and was used to decontaminate vehicles, equipment, clothing, and other materials that had become contaminated during nuclear testing activities. The CAS includes the effluent collection and distribution systems for Buildings 6-605, 6-606, and 6-607, which consists of septic tanks, sumps, piping, floor drains, drain trenches, cleanouts, and a concrete foundation. Additional details of the site history are provided in the CAU 543 Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2004a), and the CAU 543 Corrective Action Decision Document (CADD) (NNSA/NSO, 2005).

NSTec Environmental Restoration

2007-04-01T23:59:59.000Z

448

Closure Report for Corrective Action Unit 224: Decon Pad and Septic Systems, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 224 is located in Areas 02, 03, 05, 06, 11, and 23 of the Nevada Test Site, which is situated approximately 65 miles northwest of Las Vegas, Nevada. CAU 224 is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Decon Pad and Septic Systems and is comprised of the following nine Corrective Action Sites (CASs): CAS 02-04-01, Septic Tank (Buried); CAS 03-05-01, Leachfield; CAS 05-04-01, Septic Tanks (4)/Discharge Area; CAS 06-03-01, Sewage Lagoons (3); CAS 06-05-01, Leachfield; CAS 06-17-04, Decon Pad and Wastewater Catch; CAS 06-23-01, Decon Pad Discharge Piping; CAS 11-04-01, Sewage Lagoon; and CAS 23-05-02, Leachfield. The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 02-04-01, 03-05-01, 06-03-01, 11-04-01, and 23-05-02 is no further action. As a best management practice, the septic tanks and distribution box were removed from CASs 02-04-01 and 11-04-01 and disposed of as hydrocarbon waste. The NDEP-approved correction action alternative for CASs 05-04-01, 06-05-01, 06-17-04, and 06-23-01 is clean closure. Closure activities for these CASs included removing and disposing of radiologically and pesticide-impacted soil and debris. CAU 224 was closed in accordance with the NDEP-approved CAU 224 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 224 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2005). This Closure Report documents CAU 224 closure activities. During closure activities, approximately 60 cubic yards (yd3) of mixed waste in the form of soil and debris; approximately 70 yd{sup 3} of sanitary waste in the form of soil, liquid from septic tanks, and concrete debris; approximately 10 yd{sup 3} of hazardous waste in the form of pesticide-impacted soil; approximately 0.5 yd{sup 3} of universal waste in the form of fluorescent light bulbs; and approximately 0.5 yd{sup 3} of low-level waste in the form of a radiologically impacted fire hose rack were generated, managed, and disposed of appropriately. Waste minimization techniques, such as the utilization of laboratory analysis and field screening to guide the extent of excavations, were employed during the performance of closure work.

NSTec Environmental Restoration

2007-10-01T23:59:59.000Z

449

Closure Report for Corrective Action Unit 547: Miscellaneous Contaminated Waste Sites, Nevada National Security Site, Nevada  

SciTech Connect (OSTI)

This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 547, Miscellaneous Contaminated Waste Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 547 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 547 consists of the following three Corrective Action Sites (CASs), located in Areas 2, 3, and 9 of the Nevada National Security Site: (1) CAS 02-37-02, Gas Sampling Assembly; (2) CAS 03-99-19, Gas Sampling Assembly; AND (3) CAS 09-99-06, Gas Sampling Assembly Closure activities began in August 2011 and were completed in June 2012. Activities were conducted according to the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for CAU 547 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The recommended corrective action for the three CASs in CAU 547 was closure in place with administrative controls. The following closure activities were performed: (1) Open holes were filled with concrete; (2) Steel casings were placed over vertical expansion joints and filled with cement; (3) Engineered soil covers were constructed over piping and exposed sections of the gas sampling system components; (4) Fencing, monuments, Jersey barriers, radiological postings, and use restriction (UR) warning signs were installed around the perimeters of the sites; (5) Housekeeping debris was picked up from around the sites and disposed; and (6) Radiological surveys were performed to confirm final radiological postings. UR documentation is included in Appendix D. The post-closure plan was presented in detail in the CADD/CAP for CAU 547 and is included as Appendix F of this report. The requirements are summarized in Section 5.2 of this report. The proposed post-closure requirements consist of visual inspections to determine the condition of postings and radiological surveys to verify contamination has not migrated. NNSA/NSO requests the following: (1) A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 547; and (2) The transfer of CAU 547 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.

NSTec Environmental Restoration

2012-07-17T23:59:59.000Z

450

Deep Resistivity Structure of Rainier Mesa-Shoshone Mountain, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

The U. S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) at their Nevada Site Office (NSO) are addressing groundwater contamination resulting from historical underground nuclear testing through the Environmental Management (EM) program and, in particular, the Underground Test Area (UGTA) project. During 2005, the U.S. Geological Survey (USGS), funded by the DOE and NNSA-NSO, collected and processed data from twenty-six Magnetotelluric (MT) and Audio-Magnetotelluric (AMT) sites at the Nevada Test Site. Data stations were located in and near Rainier Mesa and Shoshone Mountain to assist in characterizing the pre-Tertiary geology in those areas. These new stations extend to the west the hydrogeologic study that was conducted in Yucca Flat in 2003. This work has helped to refine the character, thickness, and lateral extent of pre Tertiary confining units. In particular, a major goal has been to define the upper clastic confining unit (UCCU – late Devonian to Mississippian-age siliciclastic rocks assigned to the Eleana Formation and Chainman Shale(Bechtel Nevada, 2006)) in the Yucca Flat area and west towards Shoshone Mountain in the south, east of Buckboard Mesa, and onto Rainier Mesa in the north. The Nevada Test Site magnetotelluric data interpretation presented in this report includes the results of detailed two-dimensional (2 D) resistivity modeling for each profile (including alternative interpretations) and gross inferences on the three dimensional (3 D) character of the geology within the region. The character, thickness, and lateral extent of the Chainman Shale and Eleana Formation that comprise the Upper Clastic Confining Unit (UCCU) are generally characterized in the upper 5 km. The interpretation is not well determined where conductive TCU overlies conductive Chainman Shale, where resistive Eleana Formation overlies resistive LCA units, or where resistive VTA rock overlies units of the Eleana Formation. The nature of the volcanic units in the west has been refined as are large and small fault structures such as the CP Thrust Fault, the Carpetbag Fault, and the Yucca Fault that cross Yucca Flat. The subsurface electrical resistivity distribution and inferred geologic structures determined by this investigation should help constrain the hydrostratigraphic framework model that is under development for the Rainier Mesa/Shoshone Mountain Corrective Action Unit and areas to the west and in understanding the effects on ground-water flow in the area.

Theodore H. Asch; Brian D. Rodriguez; Jay A. Sampson; Jackie M. Williams; Maryla Deszcz-Pan

2006-12-12T23:59:59.000Z

451

CBER-DETR Nevada Coincident and Leading Employment Indexes Continue to Show a Pause in the Recovery  

E-Print Network [OSTI]

Statistics. The Nevada Coincident Employment Index includes four employment measures ­ household employmentCBER-DETR Nevada Coincident and Leading Employment Indexes1 Indexes Continue to Show a Pause in the Recovery The Nevada Coincident Employment Index measures the ups and downs of the Nevada economy using

Ahmad, Sajjad

452

Photo Library of the Nevada Site Office (Includes historical archive of nuclear testing images)  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

See also the Historical Film Library at http://www.nv.doe.gov/library/films/testfilms.aspx and the Current Film Library at http://www.nv.doe.gov/library/films/current.aspx. Current films can be viewed online, but only short clips of the historical films are viewable. They can be ordered via an online request form for a very small shipping and handling fee.

453

A Cold War Battlefield: Frenchman Flat Historic District, Nevada Test Site, Nye County, Nevada  

SciTech Connect (OSTI)

This report provides the U.S. Department of Energy, Nevada Operations Office with the documentation necessary to establish the Frenchman Flat Historic District on the Nevada Test Site (NTS). It includes a list of historic properties that contribute to the eligibility of the district for inclusion in the National Register of Historic Places (NRHP) and provides contextual information establishing its significance. The list focuses on buildings, structures and features associated with the period of atmospheric testing of nuclear weapons on the NTS between 1951 and 1962. A total of 157 locations of buildings and structures were recorded of which 115 are considered to be eligible for the NRHP. Of these, 28 have one or more associated features which include instrumentation supports, foundations, etc. The large majority of contributing structures are buildings built to study the blast effects of nuclear weaponry. This has resulted in a peculiar accumulation of deteriorated structures that, unlike most historic districts, is best represented by those that are the most damaged. Limitations by radiological control areas, surface exposure and a focus on the concentration of accessible properties on the dry lake bed indicate additional properties exist which could be added to the district on a case-by-case basis.

Johnson, William Gray [DRI; Holz, Barbara A [DRI; Jones, Robert [DRI

2000-08-01T23:59:59.000Z

454

Closure Report for Corrective Action Unit 107: Low Impact Soil Sites, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 107 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Low Impact Soil Sites' and consists of the following 15 Corrective Action Sites (CASs), located in Areas 1, 2, 3, 4, 5, 9, 10, and 18 of the Nevada Test Site: CAS 01-23-02, Atmospheric Test Site - High Alt; CAS 02-23-02, Contaminated Areas (2); CAS 02-23-03, Contaminated Berm; CAS 02-23-10, Gourd-Amber Contamination Area; CAS 02-23-11, Sappho Contamination Area; CAS 02-23-12, Scuttle Contamination Area; CAS 03-23-24, Seaweed B Contamination Area; CAS 03-23-27, Adze Contamination Area; CAS 03-23-28, Manzanas Contamination Area; CAS 03-23-29, Truchas-Chamisal Contamination Area; CAS 04-23-02, Atmospheric Test Site T4-a; CAS 05-23-06, Atmospheric Test Site; CAS 09-23-06, Mound of Contaminated Soil; CAS 10-23-04, Atmospheric Test Site M-10; and CAS 18-23-02, U-18d Crater (Sulky). Closure activities were conducted from February through April 2009 according to the FFACO (1996; as amended February 2008) and Revision 1 of the Streamlined Approach for Environmental Restoration Plan for CAU 107 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2009). The corrective action alternatives included No Further Action and Closure in Place with Administrative Controls. Closure activities are summarized.

NSTec Environmental Restoration

2009-06-01T23:59:59.000Z

455

Well Completion Report for Corrective Action Unit 443 Central Nevada Test Area Nye County, Nevada  

SciTech Connect (OSTI)

The drilling program described in this report is part of a new corrective action strategy for Corrective Action Unit (CAU) 443 at the Central Nevada Test Area (CNTA). The drilling program included drilling two boreholes, geophysical well logging, construction of two monitoring/validation (MV) wells with piezometers (MV-4 and MV-5), development of monitor wells and piezometers, recompletion of two existing wells (HTH-1 and UC-1-P-1S), removal of pumps from existing wells (MV-1, MV-2, and MV-3), redevelopment of piezometers associated with existing wells (MV-1, MV-2, and MV-3), and installation of submersible pumps. The new corrective action strategy includes initiating a new 5-year proof-of-concept monitoring period to validate the compliance boundary at CNTA (DOE 2007). The new 5-year proof-of-concept monitoring period begins upon completion of the new monitor wells and collection of samples for laboratory analysis. The new strategy is described in the Corrective Action Decision Document/Corrective Action Plan addendum (DOE 2008a) that the Nevada Division of Environmental Protection approved (NDEP 2008).

None

2009-12-01T23:59:59.000Z

456

Closure Report for Corrective Action Unit 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 553: Areas 19, 20 Mud Pits and Cellars, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 553 are located within Areas 19 and 20 of the Nevada Test Site. Corrective Action Unit 553 is comprised of the following CASs: •19-99-01, Mud Spill •19-99-11, Mud Spill •20-09-09, Mud Spill •20-99-03, Mud Spill The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 553 were met. To achieve this, the following actions were or will be performed: •Review the current site conditions including the concentration and extent of contamination. •Implement any corrective actions necessary to protect human health and the environment. •Properly dispose of corrective action and investigation wastes. •Document the Notice of Completion and closure of CAU 553 to be issued by Nevada Division of Environmental Protection.

Al Wickline

2007-08-01T23:59:59.000Z

457

Hydrogeologic investigations at the Nevada Test Site  

SciTech Connect (OSTI)

The Nevada Test Site was established in 1950 as a continental area for testing nuclear devices and, since 1963, all nuclear detonations there have been underground. Most tests are conducted in vertical shafts with a small percentage conducted in tunnels. The majority of detonation points are above the water table, primarily in volcanic rocks or alluvium. In the testing areas the water table is 450--700 m below the surface. Pre- and post- event geologic investigations are conducted for each test location and long-term studies assess the impact of underground testing on a more regional scale. Studies in progress have not identified any impact on the regional ground water system from testing, but some local effects have been recognized. In some areas where several large tests have been conducted below the water table, water levels hundreds of meters above the regional water table have been measured and radioactivity has been discovered associated with fractures in a few holes. Flow-through and straddle packer testing has revealed unexpectedly high hydraulic pressures at depth. Recently, a multiple completion monitoring well installed to study three zones has confirmed the existence of a significant upward hydraulic gradient. These observations of local pressurization and fracture flow are being further explored to determine the influence of underground nuclear testing on the regional hydrogeologic system.

Hawkins, W L [Los Alamos National Lab., NM (United States)] [Los Alamos National Lab., NM (United States); Trudeau, D A [Geological Survey, Las Vegas, NV (United States)] [Geological Survey, Las Vegas, NV (United States); Drellack, S L [Raytheon Services Nevada, Inc., Mercury, NV (United States)] [Raytheon Services Nevada, Inc., Mercury, NV (United States)

1992-01-01T23:59:59.000Z

458

NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA, JUNE 2006  

SciTech Connect (OSTI)

This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION NEVADA SITE OFFICE

2006-06-01T23:59:59.000Z

459

Low-Level Waste Overview of the Nevada Test Site  

SciTech Connect (OSTI)

This paper provides an overview and the impacts of new policies, processes, and opportunities at the Nevada Test Site. Operational changes have been implemented, such as larger trench sizes and more efficient soil management as have administrative processes to address U.S. Department of Energy and U.S. Code of Federal Regulation analyses. Some adverse conditions have prompted changes in transportation and mixed low-level waste polices, and a new funding mechanism was developed. This year has seen many changes to the Nevada Test Site disposal family.

J. T. Carilli; M. G. Skougard; S. K. Krenzien; J.K Wrapp; C. Ramirez; V. Yucel; G.J. Shott; S.J. Gordon; K.C. Enockson; L.T. Desotell

2008-02-01T23:59:59.000Z

460

Closure Report for Corrective Action Unit 538: Spill Sites, Nevada Test Site, Nevada with ROTC-1, Revision 0  

SciTech Connect (OSTI)

This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 538, Spill Sites, located at the Nevada Test Site (NTS) in Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The corrective action sites (CASs) within CAU 538 are located within Areas 2, 3, 6, 12, and 23 of the NTS. The purpose of this CR is to provide documentation for the absence of contamination or that the closure objectives have been met for each CAS within CAU 538.

Alfred Wickline

2007-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 554: Area 23 Release Site, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 554 is located in Area 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 554 is comprised of one Corrective Action Site (CAS), which is: 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. This site consists of soil contamination resulting from a fuel release from underground storage tanks (USTs). Corrective Action Site 23-02-08 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for this CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document for CAU 554. Corrective Action Site 23-02-08 will be investigated based on the data quality objectives (DQOs) developed on July 15, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; and contractor personnel. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 554.

David A. Strand

2004-10-01T23:59:59.000Z

462

Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives.

Matthews, Patrick

2014-05-01T23:59:59.000Z

463

Hydraulic Property and Soil Textural Classification Measurements for Rainier Mesa, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This report presents particle size analysis, field-saturated hydraulic conductivity measurements, and qualitative descriptions of surficial materials at selected locations at Rainier Mesa, Nevada. Measurements and sample collection were conducted in the Rainier Mesa area, including unconsolidated sediments on top of the mesa, an ephemeral wash channel near the mesa edge, and dry U12n tunnel pond sediments below the mesa. Particle size analysis used a combination of sieving and optical diffraction techniques. Field-saturated hydraulic conductivity measurements employed a single-ring infiltrometer with analytical formulas that correct for falling head and spreading outside the ring domain. These measurements may prove useful to current and future efforts at Rainier Mesa aimed at understanding infiltration and its effect on water fluxes and radionuclide transport in the unsaturated zone.

Ebel, Brian A.; Nimmo, John R.

2009-12-29T23:59:59.000Z

464

Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 9, Index  

SciTech Connect (OSTI)

This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Plan for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules.

NONE

1988-12-01T23:59:59.000Z

465

Closure Report for Corrective Action Unit 392: Spill Sites and Construction Materials, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This Closure Report documents the closure activities that were conducted to close Corrective Action Unit (CAU) 392--Spill Sites and Construction Materials located on the Nevada Test Site (NTS). CAU 392 is listed on in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996) and consists of the following six Corrective Action Sites (CASs) located in Areas 5 and 6 of the NTS: CAS 05-17-02 Construction Materials/Lead Bricks; CAS 06-17-03 Cement Mud Pit; CAS 06-1 9-01 Cable Pile; Powder Piles (3); CAS 06-44-02 Paint Spill; CAS 06-44-03 Plaster Spill; CAS 06-44-04 Cutting Fluid Discharge Ditch. Closure activities were performed in two phases. Phase 1 activities consisted of collecting waste characterization samples of soil and material present on-site, and where appropriate, performing radiological screening of debris at the six CASs. Results were used to determine how waste generated during closure activities would be handled and disposed of, i.e., as nonhazardous sanitary or hazardous waste, etc. Phase 2 activities consisted of closing each CAS by removing debris and/or soil, disposing of the generated waste, and verifying that each CAS was clean closed by visual inspection and/or by the collecting soil verification samples for laboratory analysis. Copies of the analytical results for the site verification samples are included in Appendix A. Copies of the Sectored Housekeeping Site Closure Verification Form for each of the six CASs are included in Appendix 8. Appendix C contains a copy of the Bechtel Nevada (BN) On-site Waste Transport Manifest for the hazardous waste generated during closure of CAS 06-44-02.

R. B. Jackson

2002-02-01T23:59:59.000Z

466

US Department of Energy DOE Nevada Operations Office, Nevada Test Site: Underground safety and health standards  

SciTech Connect (OSTI)

The Nevada Test Site Underground Safety and Health Standards Working Group was formed at the direction of John D. Stewart, Director, Nevada Test Site Office in April, 1990. The objective of the Working Group was to compile a safety and health standard from the California Tunnel Safety Orders and OSHA for the underground operations at the NTS, (excluding Yucca Mountain). These standards are called the NTS U/G Safety and Health Standards. The Working Group submits these standards as a RECOMMENDATION to the Director, NTSO. Although the Working Group considers these standards to be the most integrated and comprehensive standards that could be developed for NTS Underground Operations, the intent is not to supersede or replace any relevant DOE orders. Rather the intent is to collate the multiple safety and health references contained in DOE Order 5480.4 that have applicability to NTS Underground Operations into a single safety and heath standard to be used in the underground operations at the NTS. Each portion of the standard was included only after careful consideration by the Working Group and is judged to be both effective and appropriate. The specific methods and rationale used by the Working Group are outlined as follows: The letter from DOE/HQ, dated September 28, 1990 cited OSHA and the CTSO as the safety and health codes applicable to underground operations at the NTS. These mandated codes were each originally developed to be comprehensive, i.e., all underground operations of a particular type (e.g., tunnels in the case of the CTSO) were intended to be adequately regulated by the appropriate code. However, this is not true; the Working Group found extensive and confusing overlap in the codes in numerous areas. Other subjects and activities were addressed by the various codes in cursory fashion or not at all.

Not Available

1993-05-01T23:59:59.000Z

467

Environmental assessment for the Groundwater Characterization Project, Nevada Test Site, Nye County, Nevada; Revision 1  

SciTech Connect (OSTI)

The US Department of Energy (DOE) proposes to conduct a program to characterize groundwater at the Nevada Test Site (NTS), Nye County, Nevada, in accordance with a 1987 DOE memorandum stating that all past, present, and future nuclear test sites would be treated as Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites (Memorandum from Bruce Green, Weapons Design and Testing Division, June 6, 1987). DOE has prepared an environmental assessment (DOE/EA-0532) to evaluate the environmental consequences associated with the proposed action, referred to as the Groundwater Characterization Project (GCP). This proposed action includes constructing access roads and drill pads, drilling and testing wells, and monitoring these wells for the purpose of characterizing groundwater at the NTS. Long-term monitoring and possible use of these wells in support of CERCLA, as amended by the Superfund Amendments and Reauthorization Act, is also proposed. The GCP includes measures to mitigate potential impacts on sensitive biological, cultural and historical resources, and to protect workers and the environment from exposure to any radioactive or mixed waste materials that may be encountered. DOE considers those mitigation measures related to sensitive biological, cultural and historic resources as essential to render the impacts of the proposed action not significant, and DOE has prepared a Mitigation Action Plan (MAP) that explains how such mitigations will be planned and implemented. Based on the analyses presented in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement is not required and the Department is issuing this FONSI.

NONE

1992-08-01T23:59:59.000Z

468

TESTING MODELS FOR BASALTIC VOLCANISM: IMPLICATIONS FOR YUCCA MOUNTAIN, NEVADA  

E-Print Network [OSTI]

TESTING MODELS FOR BASALTIC VOLCANISM: IMPLICATIONS FOR YUCCA MOUNTAIN, NEVADA Eugene Smith 1 The determination of volcanic risk to the proposed high- level nuclear waste repository at Yucca Mountain requires, then volcanism in the future may not be a significant threat to Yucca Mountain. On the other hand, if melting

Conrad, Clint

469

Emphasis/Nevada STDEM : user's guide : version 1.0.  

SciTech Connect (OSTI)

STDEM is the structured mesh time-domain electromagnetic and plasma physics component of Emphasis/Nevada. This report provides a guide on using STDEM. Emphasis, the electromagnetic physics analysis system, is a suite of codes for the simulation of electromagnetic and plasma physics phenomena. The time-dependent components of Emphasis have been implemented using the Nevada framework [1]. The notation Emphasis/Nevada is used to highlight this relationship and/or distinguish the time-dependent components of Emphasis. In theory the underlying framework should have little influence on the user's interaction with the application. In practice the framework tends to be more invasive as it provides key services such as input parsing and defines fundamental concepts and terminology. While the framework offers many technological advancements from a software development point of view, from a user's perspective the key benefits of the underlying framework are the common interface for all framework physics modules as well as the ability to perform coupled physics simulations. STDEM is the structured time-domain electromagnetic and plasma physics component of Emphasis/Nevada. STDEM provides for the full-wave solution to Maxwell's equations on multi-block three-dimensional structured grids using finite-difference time-domain (FDTD) algorithms. Additionally STDEM provides for the fully relativistic, self-consistent simulation of charged particles using particle-in-cell (PIC) algorithms.

Seidel, David Bruce; Coats, Rebecca Sue; Pasik, Michael Francis

2005-04-01T23:59:59.000Z

470

EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada  

Broader source: Energy.gov [DOE]

The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada.

471

Nevada National Security Site Groundwater Program Welcomes Peer Review Team  

Broader source: Energy.gov [DOE]

Recently, an independent peer review team was invited to assess the groundwater characterization program at the Nevada National Security Site (NNSS). This nationally recognized group of experts, from various external organizations, will examine the computer modeling approach developed to better understand how historic underground nuclear testing in Yucca Flat affected the groundwater.

472

University of Nevada, Las Vegas Department of Mathematical Sciences  

E-Print Network [OSTI]

-based probability and statistics course for engineering and science majors. The main goal of this course, and Fri, 1:30 p.m.-3:00 p.m. or by appointment. Textbook: Probability & Statistics for EngineersUniversity of Nevada, Las Vegas Department of Mathematical Sciences STAT411 Statistical Methods I

Cho, Hokwon

473

Acknowledgments This work is supported in part by NSF with contract number 0721452.  

E-Print Network [OSTI]

Sevincer University of Nevada, Reno August 2010 #12;ii On Prototyping Multi-Transceiver Free-Space-Optical Communication Structures Abdullah Sevincer University of Nevada, Reno, 2010 Supervisor: Murat Yuksel Abstract. Although it has the advantage of the high speed modulation, maintenance of line-of-sight (LOS) between

Yuksel, Murat

474

NETL F 451.1/1-1, Categorical Exclusion Designation Form  

Broader source: Energy.gov (indexed) [DOE]

Institute FE Desert Research Institute SCCGasification Division FY11-14 10110 - 10312013 Arun C Bose Reno, Washoe County, NV R&D to Prepare and Characterize CoalBiomass...

475

2011-2012 Student Accomplishments Entomological Society of America  

E-Print Network [OSTI]

.S. Competition ­ Ashley Roden v "They're everywhere! Counting and extracting House Dust Mites (Dermatophagoides meeting in Reno, NV v Competed in student debate competition v Presented research "Ecological importance

Arnold, Jonathan

476

Corrective Action Investigation Plan for Corrective Action Unit 560: Septic Systems, Nevada Test Site, Nevada with ROTC1, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 560 is located in Areas 3 and 6 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 560 is comprised of the seven corrective action sites (CASs) listed below: • 03-51-01, Leach Pit • 06-04-02, Septic Tank • 06-05-03, Leach Pit • 06-05-04, Leach Bed • 06-59-03, Building CP-400 Septic System • 06-59-04, Office Trailer Complex Sewage Pond • 06-59-05, Control Point Septic System These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 22, 2008, by representatives from the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 560.

Grant Evenson

2008-05-01T23:59:59.000Z

477

Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

This closure report documents that the closure activities performed at Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits, were in accordance with the Nevada Division of Environmental Protection approved Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 358.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

2004-01-01T23:59:59.000Z

478

Corrective Action Investigation plan for Corrective Action Unit 546: Injection Well and Surface Releases, Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 546 is located in Areas 6 and 9 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 546 is comprised of two Corrective Action Sites (CASs) listed below: •06-23-02, U-6a/Russet Testing Area •09-20-01, Injection Well These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on November 8, 2007, by representatives of the Nevada Division of Environmental Protection and U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process has been used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 546.

Alfred Wickline

2008-03-01T23:59:59.000Z

479

Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit 374 is located in Areas 18 and 20 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 374 comprises the five corrective action sites (CASs) listed below: • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on October 20, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 374.

Patrick Matthews

2010-02-01T23:59:59.000Z

480

Southern Nevada Alternative Fuels Demonstration Project  

SciTech Connect (OSTI)

The Southern Nevada Alternative Fuels Program is designed to demonstrate, in a day-to-day bus operation, the reliability and efficiency of a hydrogen bus operation under extreme conditions. By using ICE technology and utilizing a virtually emission free fuel, benefits to be derived include air quality enhancement and vehicle performance improvements from domestically produced, renewable energy sources. The project objective is to help both Ford and the City demonstrate and evaluate the performance characteristics of the E-450 H2ICE shuttle buses developed by Ford, which use a 6.8-liter supercharged Triton V-10 engine with a hydrogen storage system equivalent to 29 gallons of gasoline. The technology used during the demonstration project in the Ford buses is a modified internal combustion engine that allows the vehicles to run on 100% hydrogen fuel. Hydrogen gives a more thorough fuel burn which results in more power and responsiveness and less pollution. The resultant emissions from the tailpipe are 2010 Phase II compliant with NO after treatment. The City will lease two of these E-450 H2ICE buses from Ford for two years. The buses are outfitted with additional equipment used to gather information needed for the evaluation. Performance, reliability, safety, efficiency, and rider comments data will be collected. The method of data collection will be both electronically and manually. Emissions readings were not obtained during the project. The City planned to measure the vehicle exhaust with an emissions analyzer machine but discovered the bus emission levels were below the capability of their machine. Passenger comments were solicited on the survey cards. The majority of comments were favorable. The controllable issues encountered during this demonstration project were mainly due to the size of the hydrogen fuel tanks at the site and the amount of fuel that could be dispensed during a specified period of time. The uncontrollable issues encountered during this project were related to the economy and the budget cutbacks required during the project duration, which resulted in fewer bus drivers than expected the ultimate shut down of the City’s downtown bus operations.

Hyde, Dan; Fast, Matthew

2009-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "reno nv nevada" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Closure Report for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 117 comprises Corrective Action Site (CAS) 26-41-01, Pluto Disassembly Facility, located in Area 26 of the Nevada Test Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CAU 117 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 117 issued by the Nevada Division of Environmental Protection. From May 2008 through February 2009, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 117, Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. The purpose of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 117. Assessment of the data generated from closure activities indicated that the final action levels were exceeded for polychlorinated biphenyls (PCBs) reported as total Aroclor and radium-226. A corrective action was implemented to remove approximately 50 cubic yards of PCB-contaminated soil, approximately 1 cubic foot of radium-226 contaminated soil (and scabbled asphalt), and a high-efficiency particulate air filter that was determined to meet the criteria of a potential source material (PSM). Electrical and lighting components (i.e., PCB-containing ballasts and capacitors) and other materials (e.g., mercury-containing thermostats and switches, lead plugs and bricks) assumed to be PSM were also removed from Building 2201, as practical, without the need for sampling. Because the COC contamination and PSMs have been removed, clean closure of CAS 26-41-01 is recommended, and no use restrictions are required to be placed on this CAU. No further action is necessary because no other contaminants of potential concern were found above preliminary action levels. The physical end state for Building 2201 is expected to be eventual demolition to slab. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Clean closure is the recommended corrective action for CAS 26-41-01 in CAU 117. • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 117. • Corrective Action Unit 117 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.

Mark Burmeister

2009-06-01T23:59:59.000Z

482

Corrective Action Investigation Plan for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 541 is co-located on the boundary of Area 5 of the Nevada National Security Site and Range 65C of the Nevada Test and Training Range, approximately 65 miles northwest of Las Vegas, Nevada. CAU 541 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 541, which comprises the following corrective action sites (CASs): • 05-23-04, Atmospheric Tests (6) - BFa Site • 05-45-03, Atmospheric Test Site - Small Boy These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on April 1, 2014, by representatives of the Nevada Division of Environmental Protection; U.S. Air Force; and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 541. The site investigation process also will be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CASs 05-23-04 and 05-45-03 are from nuclear testing activities conducted at the Atmospheric Tests (6) - BFa Site and Atmospheric Test Site - Small Boy sites. The presence and nature of contamination at CAU 541 will be evaluated based on information collected from field investigations. Radiological contamination will be evaluated based on a comparison of the total effective dose at sample locations to the dose-based final action level. The total effective dose will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.

Matthews, Patrick

2014-09-01T23:59:59.000Z

483

Closure Report for Corrective Action Unit 544: Cellars, Mud Pits, and Oil Spills, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 544: Cellars, Mud Pits, and Oil Spills, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 544 are located within Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada National Security Site. Corrective Action Unit 544 comprises the following CASs: • 02-37-08, Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mud Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for CASs within CAU 544 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 544 issued by the Nevada Division of Environmental Protection.

Mark Krauss and Catherine Birney

2011-05-01T23:59:59.000Z

484

Corrective Action Investigation Plan for Corrective Action Unit 145: Wells and Storage Holes, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 145: Wells and Storage Holes. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 145 is located in Area 3 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 145 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-20-01, Core Storage Holes; (2) 03-20-02, Decon Pad and Sump; (3) 03-20-04, Injection Wells; (4) 03-20-08, Injection Well; (5) 03-25-01, Oil Spills; and (6) 03-99-13, Drain and Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. One conceptual site model with three release scenario components was developed for the six CASs to address all releases associated with the site. The sites will be investigated based on data quality objectives (DQOs) developed on June 24, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQOs process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 145.

David A. Strand

2004-09-01T23:59:59.000Z

485

Corrective Action Investigation Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 139 is located in Areas 3, 4, 6, and 9 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 139 is comprised of the seven corrective action sites (CASs) listed below: (1) 03-35-01, Burn Pit; (2) 04-08-02, Waste Disposal Site; (3) 04-99-01, Contaminated Surface Debris; (4) 06-19-02, Waste Disposal Site/Burn Pit; (5) 06-19-03, Waste Disposal Trenches; (6) 09-23-01, Area 9 Gravel Gertie; and (7) 09-34-01, Underground Detection Station. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives with the exception of CASs 09-23-01 and 09-34-01. Regarding these two CASs, CAS 09-23-01 is a gravel gertie where a zero-yield test was conducted with all contamination confined to below ground within the area of the structure, and CAS 09-34-01 is an underground detection station where no contaminants are present. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for the other five CASs where information is insufficient. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 4, 2006, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 139.

Grant Evenson

2006-04-01T23:59:59.000Z

486

Potential Economic Impact of Constructing and Operating Solar Power Generation Facilities in Nevada  

SciTech Connect (OSTI)

Nevada has a vast potential for electricity generation using solar power. An examination of the stock of renewable resources in Nevada proves that the state has the potential to be a leader in renewable-electric generation--one of the best in the world. This study provides estimates on the economic impact in terms of employment, personal income, and gross state product (GSP) of developing a portion of Nevada's solar energy generation resources.

Schwer, R. K.; Riddel, M.

2004-02-01T23:59:59.000Z

487

Closure Report for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 574 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Neptune' and consists of the following two Corrective Action Sites (CASs), located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); and (2) CAS 12-45-01, U12e.05 Crater (Blanca). This Closure Report presents information supporting closure of CAU 574 according to the FFACO (FFACO, 1996 [as amended March 2010]) and the Streamlined Approach for Environmental Restoration Plan for CAU 574 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The following activities were performed to support closure of CAU 574: (1) In situ external dose rate measurements were collected using thermoluminescent dosimeters at CAS 12-45-01, U12e.05 Crater (Blanca). (2) Total effective dose rates were determined at both sites by summing the internal and external dose rate components. (3) A use restriction (UR) was implemented at CAS 12-23-10, U12c.03 Crater (Neptune). Areas that exceed the final action level (FAL) of 25 millirems per year (mrem/yr) based on the Occasional Use Area exposure scenario are within the existing use restricted area for CAU 551. The 25-mrem/yr FAL is not exceeded outside the existing CAU 551 UR for any of the exposure scenarios (Industrial Area, Remote Work Area, and Occasional Use Area). Therefore, the existing UR for CAU 551 is sufficient to bound contamination that exceeds the FAL. (4) An administrative UR was implemented at CAS 12-45-01, U12e.05 Crater (Blanca) as a best management practice (BMP). The 25-mrem/yr FAL was not exceeded for the Remote Work Area or Occasional Use Area exposure scenarios; therefore, a UR is not required. However, because the 25-mrem/yr FAL was exceeded for the Industrial Area exposure scenario, an administrative UR was established as a BMP. UR documentation is included as Appendix B. The UR at CAS 12-23-10, U12c.03 Crater (Neptune), is within the existing UR for CAU 551. Additional postings were not installed, and annual post-closure inspections will be performed in conjunction with the inspections performed for CAU 551. At CAS 12-45-01, U12e.05 Crater (Blanca), the administrative UR does not require postings or inspections. NNSA/NSO requests the following: (1) A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 574; and (2) The transfer of CAU 574 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO

NSTec Environmental Restoration

2012-04-30T23:59:59.000Z

488

A Historical Evaluation of the U15 Complex, Nevada National Security Site, Nye County, Nevada  

SciTech Connect (OSTI)

This report presents a historical evaluation of the U15 Complex on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office and the U.S. Department of Defense, Defense Threat Reduction Agency. Three underground nuclear tests and two underground nuclear fuel storage experiments were conducted at the complex. The nuclear tests were Hard Hat in 1962, Tiny Tot in 1965, and Pile Driver in 1966. The Hard Hat and Pile Driver nuclear tests involved different types of experiment sections in test drifts at various distances from the explosion in order to determine which sections could best survive in order to design underground command centers. The Tiny Tot nuclear test involved an underground cavity in which the nuclear test was executed. It also provided data in designing underground structures and facilities to withstand a nuclear attack. The underground nuclear fuel storage experiments were Heater Test 1 from 1977 to 1978 and Spent Fuel Test - Climax from 1978 to 1985. Heater Test 1 was used to design the later Spent Fuel Test - Climax experiment. The latter experiment was a model of a larger underground storage facility and primarily involved recording the conditions of the spent fuel and the surrounding granite medium. Fieldwork was performed intermittently in the summers of 2011 and 2013, totaling 17 days. Access to the underground tunnel complex is sealed and unavailable. Restricted to the surface, four buildings, four structures, and 92 features associated with nuclear testing and fuel storage experiment activities at the U15 Complex have been recorded. Most of these are along the west side of the complex and next to the primary access road and are characteristic of an industrial mining site, albeit one with scientific interests. The geomorphological fieldwork was conducted over three days in the summer of 2011. It was discovered that major modifications to the terrain have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to the tests and experiments, and construction of drill pads and retention ponds. Six large trenches for exploring across the Boundary geologic fault are also present. The U15 Complex, designated historic district 143 and site 26NY15177, is eligible to the National Register of Historic Places under Criteria A, C, and D of 36 CFR Part 60.4. As a historic district and archaeological site eligible to the National Register of Historic Places, the Desert Research Institute recommends that the area defined for the U15 Complex, historic district 143 and site 26NY15117, be left in place in its current condition. The U15 Complex should also be included in the NNSS cultural resources monitoring program and monitored for disturbances or alterations.

Drollinger, Harold [DRI; Holz, Barbara A [DRI; Bullard, Thomas F [DRI; Goldenberg, Nancy G [Carey & Co; Ashbaugh, Laurence J [DRI; Griffin, Wayne R [DRI

2014-01-09T23:59:59.000Z

489

Closure Report for Corrective Action Unit 121: Storage Tanks and Miscellaneous Sites, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 121 is identified in the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended February 2008) as Storage Tanks and Miscellaneous Sites. CAU 121 consists of the following three Corrective Action Sites (CASs) located in Area 12 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 12-01-01, Aboveground Storage Tank; (2) CAS 12-01-02, Aboveground Storage Tank; and (3) CAS 12-22-26, Drums; 2 AST's. CAU 121 closure activities were conducted according to the FFACO and the Streamlined Approach for Environmental Restoration Plan for CAU 121 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007). Field work took place from February through September 2008. Samples were collected to determine the path forward to close each site. Closure activities were completed as defined in the plan based on sample analytical results and site conditions. No contaminants of concern (COCs) were present at CAS 12-01-01; therefore, no further action was chosen as the corrective action alternative. As a best management practice (BMP), the empty aboveground storage tank (AST) was removed and disposed as sanitary waste. At CAS 12-01-02, polychlorinated biphenyls (PCBs) were present above the preliminary action level (PAL) in the soil beneath the AST that could possibly have originated from the AST contents. Therefore, PCBs were considered COCs, and the site was clean closed by excavating and disposing of soil containing PCBs. Approximately 5 cubic yards (yd{sup 3}) of soil were excavated and disposed as petroleum hydrocarbon PCB remediation waste, and approximately 13 yd3 of soil were excavated and disposed as PCB remediation waste. Cleanup samples were collected to confirm that the remaining soil did not contain PCBs above the PAL. Other compounds detected in the soil above PALs (i.e., total petroleum hydrocarbons [TPH] and semi-volatile organic compounds [SVOCs]) were determined to not likely have originated from the tank. Additional sample results showed that the compounds were likely present as a result of degraded asphalt around the adjacent, active water tank and not from the abandoned AST; therefore, they were not considered COCs. As a BMP, the empty AST was removed and disposed as sanitary waste. No COCs were present at CAS 12-22-26; therefore, no further action was chosen as the corrective action alternative. Although TPH was present at concentrations that exceeded the PAL, the volatile organic compound and SVOC hazardous constituents of TPH did not exceed the final action levels (FALs); therefore, TPH was not considered a COC. As a BMP, the empty AST was removed and disposed as sanitary waste. Closure activities generated sanitary waste, petroleum hydrocarbon PCB remediation waste, PCB remediation waste, and hazardous waste. Waste was appropriately managed and disposed. Waste that is currently staged on site is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams.

NSTec Environmental Restoration

2008-09-01T23:59:59.000Z

490

Corrective Action Investigation Plan for Corrective Action Unit 486: Double Tracks RADSAFE Ares, Nellis Air Force Range, Nevada, Rev. 0; DOE/NV--523 UPDATED WITH ROTC No.1 and 2  

SciTech Connect (OSTI)

This CAIP presents a plan to investigate the DTRSA where unregulated disposal of radioactive and possibly hazardous waste occurred during decontamination activities for the Double Tracks test. The purpose of the corrective action investigation described in this CAIP is to: Identify and verify the locations of the decontamination facility and animal burial pit within the DTRSA; Identify the presence and nature of COPCs; Determine the vertical and lateral extent of COPCs; and Provide sufficient information and data to develop and evaluate appropriate corrective actions for the CAS. This CAIP was developed using the U.S. Environmental Protection Agency (EPA) Data Quality Objectives (DQOs) (EPA, 1994d) process to clearly define the goals for collecting environmental data, to determine data uses, and to design a data collection program that will satisfy these uses. A DQO scoping meeting was held prior to preparation of this plan; a brief summary of the DQOs is presented in Section 3.4. A more detailed summary of the DQO process and results is included in Appendix A.

ITLV

1999-11-16T23:59:59.000Z

491

Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed, and a UR was implemented. (6) At CAS 09-23-01, Area 9 Gravel Gertie, a UR was implemented. (7) At CAS 09-34-01, Underground Detection Station, no work was performed.

NSTec Environmental Restoration

2009-07-31T23:59:59.000Z

492

Surface water interaction with the flood plain in the lower Virgin River, Clark County, Nevada.  

E-Print Network [OSTI]

??Development of existing surface water rights on the Virgin River would decrease Southern Nevada's dependency on the Colorado River. Three monitoring sites were established to… (more)

Pompeo, Jeffrie L.

2008-01-01T23:59:59.000Z

493