  1. UC-70A Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Office of Legacy Management (LM)

    F. a% .~~~~~~":~,~~~~,~. .-+smiii"-l ," ^.-. _ _I ,a ,' ~, *p2 - QRkl~ oR,o~ DOE/OR/20722- 29 UC-70A Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-ACO5-81OR20722 CI c F c F F c CI c c F P RADIOLOGICAL SURVEY OF THE ALBANY RESEARCH CENTER Albany, O regon Bechtel National, inc. Advanced Technology Division L- ..^___ ~. _ .._.. -.~~_-- ._ ._.. .._ .^.". January 1985 Technical information Center Office of Scientific and Technical Information U.S.

  2. Ocean FUSRAP: feasibility of ocean disposal of materials from the Formerly Utilized Sites Remedial Action Progam (FUSRAP)

    SciTech Connect (OSTI)

    Kupferman, S.L.; Anderson, D.R.; Brush, L.H.; Gomez, L.S.; Laul, J.C.; Shephard, L.E.

    1982-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) of the Department of Energy is designed to identify and evaluate the radiological conditions at sites formerly used by the Corps of Engineers Manhattan Engineer District and the US Atomic Energy Commission. Where required, remedial action will be instituted to remove potential restrictions on the use of the sites due to residual low-level radioactive contamination. A total of 31 sites that may require remedial action has been identified. The purpose of the Ocean FUSRAP Program, which began in March 1981, is to assess the technical, environmental, and institutional feasibility of disposing, in the ocean and on the ocean floor, of FUSRAP soil and rubble which contains traces of natural radioactive materials. The initial focus has been on the Middlesex, New Jersey, Sampling Plant site and surrounding properties, which contain on the order of 100,000 metric tons of material. The Belgian Congo uranium ore and other uranium ores used by the United States were handled at the sampling plant site. In studying the feasibility of ocean disposal of FUSRAP material from Middlesex, New Jersey, we have begun to examine institutional requirements to be met, the composition of the source material with regard to its inventory of toxic chemical and radiochemical components and the impact of the source material in the marine environment. To date we have found nothing that would preclude safe and inexpensive disposal of this material in the ocean.

  3. Formerly Utilized Sites Remedial Action Program (FUSRAP) Hazelwood Interim Storage Site annual site environmental report. Calendar year 1985. [FUSRAP

    SciTech Connect (OSTI)

    Not Available

    1986-04-01

    The Hazelwood Interim Storage Site (HISS) is presently used for the storage of low-level radioactively contaminated soils. Monitoring results show that the HISS is in compliance with DOE concentration guides and radiation protection standards. Derived Concentration Guides (DCGs) represent the concentrations of radionuclides in air or water that would limit the radiation dose to 100 mrem/y. The applicable limits have been revised since the 1984 environmental monitoring report was published. The limits applied in 1984 were based on a radiation protection standard of 500 mrem/y; the limits applied for 1985 are based on a standard of 100 mrem/y. The HISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where low-level radioactive contamination remains from the early years of the nation's atomic energy program. To determine whether the site is in compliance with DOE standards, environmental measurements are expressed as percentages of the applicable DCG, while the calculated doses to the public are expressed as percentages of the applicable radiation protection standard. The monitoring program at the HISS measures uranium, radium, and thorium concentrations in surface water, groundwater, and sediment; radon gas concentrations in air; and external gamma radiation exposure rates. Potential radiation doses to the public are also calculated. The HISS was designated for remedial action under FUSRAP because radioactivity above applicable limits was found to exist at the site and its vicinity. Elevated levels of radiation still exist in areas where remedial action has not yet been completed.

  4. Legacy Management FUSRAP Sites | Department of Energy

    Energy Savers [EERE]

    Legacy Management FUSRAP Sites Legacy Management FUSRAP Sites Legacy Management FUSRAP Sites Long-Term Surveillance and Maintenance (LTS&M) of Remediated FUSRAP Sites The DOE Office of Legacy Management (LM) established LTS&M requirements for remediated FUSRAP sites. DOE evaluates the final site conditions of a remediated site on the basis of risk for different future uses. DOE then confirms that LTS&M requirements will maintain protectiveness. Most Formerly Utilized Sites Remedial

  5. Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DACW45-98-D-0028

    Office of Legacy Management (LM)

    143 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DACW45-98-D-0028 Final Report on Remedial Action at the Bayo Canyon Site Los Alamos, New Mexico August 2003 FINAL REPORT ON REMEDIAL ACTION AT THE BAY0 CANYON SITE LOS ALAMOS, NEW MEXICO August 2003 Prepared for United States Department of Energy Under Contract DACW45-98-DO028 Bechtel National, Inc. Oak Ridge, Tennessee CONTENTS Page ... FIGURES

  6. DOE/OFVZ1949402 Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Office of Legacy Management (LM)

    DOE/OFVZ1949402 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-ACO5-9%OR21949 Post-Remedial Action Report for the Former Baker Brothers Site Toledd, Ohio . February 1997 . . DOWORRl949-402 POST-REMEDIAL ACTION REPORT FOR THE REMEDIAL ACTION ATTHE FORMER BAKER BROTHERS SITE TOLEDO. OHIO FEBRUARY 1997 . United States Department of Energy I OakRidgeOpcrationsOfficc Under Contract No. DE-AC059 I OR2 1949 BY Bcchtcl National, Inc. . . : ; '.' OakRldnc.Tc~~~.- ~--~-' -------m

  7. DOE/OR/20722-83 Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Office of Legacy Management (LM)

    3 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 POST-REMEDIAL ACTION REPORT FOR THE RESIDENTIAL PROPERTIES ON GROVE AVENUE AND PARKWAY Rochelle Park, New Jersey March 1986 Bechtel National, Inc. Advanced Technology Division I LEGAL NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any of their contractors,

  8. DOE/OR/20722-88 Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Office of Legacy Management (LM)

    8 . Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 POST-REMEDIAL ACTION REPORT FOR THE WAYNE SITE - 1985 AND 1987 Wayne, New Jersey March 1989 Bechtel National, Inc. DOE/OR/20722-88 POST-REMEDIAL ACTION REPORT FOR THE WAYNE SITE - 1985 AND 1987 WAYNE, NEW JERSEY MARCH 1989 Prepared for UNITED STATES DEPARTMENT OF ENERGY OAK RIDGE OPERATIONS OFFICE Under Contract No. DE-AC05-810R20722 BY R. M. Howard Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job

  9. DOE/OR/21949-370 Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Office of Legacy Management (LM)

    949-370 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-91 OR21 949 Post-Remedial Action Report for the Removal Action at the Seymour Specialty Wire Site Seymour, Connecticut Printed on recyded/recyclable paper. @ 4.132 1890.1 January 1994 . DOE/OR/2 1949-370 POST-REMEDIAL ACTION REPORT FOR THE REMOVAL ACTION AT THE SEYMOUR SPECIALTY WIRE SITE SEYMOUR, CONNECTICUT JANUARY 1994 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract

  10. DOE/OR/20722-34 Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Office of Legacy Management (LM)

    4 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 RADIOLOGICAL SURVEY REPORT FOR THE RESIDENTIAL PROPERTY AT 10 GROVE AVENUE Rochelle Park, New Jersey September 1984 I Bechtel National, Inc. Advanced Technology Division LEGAL NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any of their contractors,

  11. DOE/OR/20722-37 Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Office of Legacy Management (LM)

    7 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 RADIOLOGICAL SURVEY REPORT FOR THE RESIDENTIAL PROPERTY AT 22 GROVE AVENUE Rochelle Park, New Jersey September 1984 Bechtel National, Inc. Advanced Technology Division LEGAL NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any of their contractors,

  12. DOE/OR/20722-38 Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Office of Legacy Management (LM)

    8 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 RADIOLOGICAL SURVEY REPORT FOR THE RESIDENTIAL PROPERTY AT 26 GROVE AVENUE Rochelle Park, New Jersey September 1984 I Bechtel National, Inc. Advanced Technology Division LEGAL NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any of their contractors,

  13. DOE/OR/20722-39 Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Office of Legacy Management (LM)

    39 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 RADIOLOGICAL SURVEY REPORT FOR THE RESIDENTIAL PROPERTY AT 30 GROVE AVENUE Rochelle Park, New Jersey September 1984 Bechtel National, Inc. Advanced Technology Division * Advanced Technology Division LEGAL NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any

  14. DOE/OR/20722-40 Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Office of Legacy Management (LM)

    40 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 RADIOLOGICAL SURVEY REPORT FOR THE RESIDENTIAL PROPERTY AT 34 GROVE AVENUE Rochelle Park, New Jersey September 1984 Bechtel National, Inc. Advanced Technology Division Advanced Technology Division LEGAL NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any of

  15. DOE/OR/20722-41 Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Office of Legacy Management (LM)

    1 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 RADIOLOGICAL SURVEY REPORT FOR THE RESIDENTIAL PROPERTY AT 38 GROVE AVENUE Rochelle Park, New Jersey September 1984 Bechtel National, Inc. Advanced Technology Division 3 Advanced Technology Division LEGAL NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any of

  16. DOE/OR/20722-42 Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Office of Legacy Management (LM)

    2 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 RADIOLOGICAL SURVEY REPORT FOR THE RESIDENTIAL PROPERTY AT 42 GROVE AVENUE Rochelle Park, New Jersey September 1984 Bechtel National, Inc. Advanced Technology Division I ~~~~~~~~~~~~~~Advanced Technology Division LEGAL NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their

  17. Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP

    Office of Environmental Management (EM)

    Sites | Department of Energy Requirements for Remediated FUSRAP Sites Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document summarizes radiological conditions at sites remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and transferred to the U.S. Department of Energy (DOE) for long-term surveillance and maintenance (LTS&M). Source document citations are presented. Most of these sites meet criteria for unrestricted use; a

  18. Linde FUSRAP Site Remediation: Engineering Challenges and Solutions of Remedial Activities on an Active Industrial Facility - 13506

    SciTech Connect (OSTI)

    Beres, Christopher M.; Fort, E. Joseph; Boyle, James D.

    2013-07-01

    The Linde FUSRAP Site (Linde) is located in Tonawanda, New York at a major research and development facility for Praxair, Inc. (Praxair). Successful remediation activities at Linde combines meeting cleanup objectives of radiological contamination while minimizing impacts to Praxair business operations. The unique use of Praxair's property coupled with an array of active and abandoned utilities poses many engineering and operational challenges; each of which has been overcome during the remedial action at Linde. The U.S. Army Corps of Engineers - Buffalo District (USACE) and CABRERA SERVICES, INC. (CABRERA) have successfully faced engineering challenges such as relocation of an aboveground structure, structural protection of an active water line, and installation of active mechanical, electrical, and communication utilities to perform remediation. As remediation nears completion, continued success of engineering challenges is critical as remaining activities exist in the vicinity of infrastructure essential to business operations; an electrical substation and duct bank providing power throughout the Praxair facility. Emphasis on engineering and operations through final remediation and into site restoration will allow for the safe and successful completion of the project. (authors)

  19. DOE/OR/20722-22 UC-70A DBaffu Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Office of Legacy Management (LM)

    22 UC-70A DBaffu Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-ACO5-81OR20722 c P c P RADIOLOGICAL SURVEY REPORT FOR THE DUPONT CHAMBER WORKS PLANT Deepwater, New Jersey Bechtel National, Inc. Advanced Technology Division June 1984 Technical Information Center Office of Scientific and Technical Information U.S. Department of Energy -- .,,.... - ~S",.W -. - - -. _ -- --- --.- ----.-- ___ ..---. -.~ LEGAL NOTICE ' I91i.m report war prepared u M account of work

  20. | OR. I-12- DOE/OR/20722-29 UC-70A Formerly Utilized Sites Remedial Action Program (FUSRAP)

    National Nuclear Security Administration (NNSA)

    | OR. I-12- DOE/OR/20722-29 UC-70A Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 RADIOLOGICAL SURVEY OF THE - ALBANY RESEARCH CENTER Albany, Oregon Bechtel National, Inc. Advanced Technology Division January 1985 Technical Information Center Office of Scientific and Technical Information U.S. Department of Energy LEGAL NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United

  1. U*2-5-~~~~ D0E10R1DOE/OR/20722-77 Formerly Utilized Sites Remedial Action Program (FUSRAP)

    Office of Legacy Management (LM)

    U*2-5-~~~~ D0E10R1DOE/OR/20722-77 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 POST-REMEDIAL ACTION REPORT FOR THE RESIDENTIAL PROPERTIES ON DAVISON AND LATHAM STREETS Maywood, New Jersey I February 1986 Bechtel National, Inc. Advanced Technology Division LEGAL NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees,

  2. Hazelwood Interim Storage Site, Hazelwood, Missouri: Annual site environmental report, Calendar year 1987: Formerly Utilized Sites Remedial Action Program (FUSRAP). [FUSRAP

    SciTech Connect (OSTI)

    Not Available

    1988-04-01

    The monitoring program at the HISS measures radon concentrations in air; external gamma radiation levels; and uranium, radium, and thorium concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and assess its potential effect on public health, the radiation dose was calculated for the maximally exposed individual. Based on the scenario described in this report, the maximally exposed individual at the HISS would receive an annual external exposure approximately equivalent to 1 percent of the DOE radiation protection standard of 100 mrem/yr. This exposure is less than the exposure a person would receive during a round-trip flight from New York to Los Angeles (because of the greater amounts of cosmic radiation at higher altitudes). The cumulative dose to the population within an 80-km (50-mi) radius of the HISS that would result from radioactive materials present at the site would be indistinguishable from the dose that the same population would receive from naturally occurring radioactive sources. The results of 1987 monitoring show that the HISS is in compliance with the DOE radiation protection standard. 12 refs., 6 figs., 11 tabs.

  3. Fall Protection Procedures for Sealing Bulk Waste Shipments by Rail Cars at Formerly Utilized Sites Remedial Action Program (FUSRAP) Sites - 13509

    SciTech Connect (OSTI)

    Boyle, J.D.; Fort, E. Joseph; Lorenz, William; Mills, Andy

    2013-07-01

    Rail-cars loaded with radioactive materials must be closed and fastened to comply with United States Department of Transportation (DOT) requirements before they shipped. Securing waste shipments in a manner that meets these regulations typically results in the use of a sealable rail-car liner. Workers accessing the tops of the 2.74 m high rail-cars to seal and inspect liners for compliance prior to shipment may be exposed to a fall hazard. Relatively recent revisions to the Fall Protection requirements in the Safety and Health Requirements Manual (EM385-1-1, U.S. Army Corps of Engineers) have necessitated modifications to the fall protection systems previously employed for rail-car loading at Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In response these projects have developed site-specific procedures to protect workers and maintain compliance with the improved fall protection regulations. (authors)

  4. FUSRAP Overview | Department of Energy

    Office of Environmental Management (EM)

    Overview FUSRAP Overview FUSRAP Overview (Waste Management Conference 2006) PDF icon FUSRAP Overview (Waste Management Conference 2006) More Documents & Publications Process for Transition of Responsibilities Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites Assessing and Implementing LTS&M Requirements for Remediation Sites Under the FUSRAP Program

  5. Lessons Learned from a Complex FUSRAP Site - Sylvania Corning FUSRAP Site - 12269

    SciTech Connect (OSTI)

    Ewy, Ann; Hays, David

    2012-07-01

    Since its addition to the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 2005, the Sylvania Corning FUSRAP Site (the Site) in Hicksville, New York, has provided challenges and opportunities from which to gain lessons learned for conducting investigation work at a complex multi-contaminant FUSRAP Site. The United States Army Corps of Engineers (USACE) and its contractors conducted a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation (RI) and are currently in the Feasibility Study (FS) phase at the Site. This paper presents the planning, execution, and reporting lessons learned by USACE during the RI/FS. The Site, operated from 1952 to 1967 for the research, development, and fabrication of nuclear elements under the Atomic Energy Commission, and other government and commercial contracts. Previous investigations performed by the New York State Department of Environmental Conservation (NYSDEC) and the current property owner have identified uranium, thorium, nickel, and chlorinated solvents, as Site contaminants [1]. The property owner is currently under two separate voluntary agreements with NYSDEC to investigate and remediate the Site. USACE's work at the site has been independent of this voluntary agreement and has moved on a parallel path with any work the property owner has completed. The project at the Site is complex because of the radiological and chemical concerns in both soils and groundwater, high hydraulically conductive soils, lack of a shallow aquiclude/aquitard, and a principal water table aquifer underlying the site. Contaminants are migrating from the Site and may potentially impact local drinking water supplies (municipal wells). During the RI/FS process the project team has encountered many issues and has thus developed many resolutions. The issues are organized into three categories: Planning and Contracting, Execution, and Reporting. Planning and Contracting lessons learned include: how to incorporate an overwhelming volume of historical data; how to manage a complex team of three prime contractors innovatively, and how to implement a project under an Award Fee task order. Execution lessons learned include: characterization of investigation derived wastes, and proper approach to radiological scanning of direct-push borings and soil cores. Reporting lessons learned include: coordinating multiple phase (iterative) reporting, large dataset presentation, and the National Priorities List (NPL) designation. The goal of this paper is to provide a resource for other project delivery teams that encounter similar situations on their projects to optimize cost savings, realization of efficiency, shorten schedules, or simply ensure higher quality deliverables. Each FUSRAP project is unique but there are many lessons we can apply to each site to gain efficiency and work more effectively. The Sylvania Corning FUSRAP site is a complex site with both soils and groundwater contamination, contamination to depths of 182 meters, and a highly politically charged environment of PRP involvement. Many of the lessons the project team has learned during the life of the project to date are being shared with others as well as being applied back to this project for future work. (authors)

  6. Assessing and Implementing LTS&M Requirements for Remediation Sites Under

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the FUSRAP Program | Department of Energy Assessing and Implementing LTS&M Requirements for Remediation Sites Under the FUSRAP Program Assessing and Implementing LTS&M Requirements for Remediation Sites Under the FUSRAP Program Assessing and Implementing LTS&M Requirements for Remediation Sites Under the FUSRAP Program (Waste Management Conference 2007) PDF icon Assessing and Implementing LTS&M Requirements for Remediation Sites Under the FUSRAP Program (Waste Management

  7. FUSRAP Stakeholder Report | Department of Energy

    Energy Savers [EERE]

    FUSRAP Stakeholder Report FUSRAP Stakeholder Report The U.S.Department of Energy (DOE) has operated the Formerly Utilized Sites Remedial Action Program (FUSRAP) since 1974. During that time,we have accomplished many activities to identify and remediate to a safe condition sites that became contaminated with radioactive materials in support of the nation's early atomic energy programs. PDF icon FUSRAP Stakeholder Report, May 2013 More Documents & Publications Recent Developments in DOE FUSRAP

  8. Managing Legacy Records for Formerly Utilized Sites Remedial Action Program

    Office of Environmental Management (EM)

    Sites | Department of Energy Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites (Waste Management Conference 2008) PDF icon Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites More Documents & Publications FUSRAP Overview Recent Developments in DOE FUSRAP Process for

  9. Niagara Falls Storage Site environmental report for calendar year 1992, 1397 Pletcher Road, Lewiston, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    This report describes the environmental surveillance program at the Niagara Falls Storage Site (NFSS) and provides the results for 1992. From 1944 to the present, the primary use of NFSS has been storage of radioactive residues produced as a by-product of uranium production. All onsite areas of residual radioactivity above guidelines have been remediated. Materials generated during remediation are stored onsite in the 4-ha (10-acre) waste containment structure (WCS). The WCS is a clay-lined, clay-capped, and grass-covered storage pile. The environmental surveillance program at NFSS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and total uranium and radium-226 concentrations in surface water, sediments, and groundwater. Several chemical parameters, including seven metals, are also routinely measured in groundwater. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. Results of environmental monitoring during 1992 indicate that levels of the parameters measured were in compliance with all but one requirement: Concentrations of iron and manganese in groundwater were above NYSDEC groundwater quality standards. However, these elements occur naturally in the soils and groundwater associated with this region. In 1992 there were no environmental occurrences or reportable quantity releases.

  10. FORMERLY UTILIZED elTEB REMEDIAL ACTION PROORAM [FUSRAP] AND

    Office of Legacy Management (LM)

    bE8IQM CRITERIA FOR r FORMERLY UTILIZED elTEB REMEDIAL ACTION PROORAM [FUSRAP] AND r 8URPLUS FACIL~TIES MANAOEMENT PROQRAM [SFMPI FEBRUARY 1886 i r s o i - o o - ~ c - o l - 1 ~ R e v . 1 DESIGN CRITERIA FOR FORMERLY UTILIZED Sf TES REMEDIAL' ACTION PROGAM ( PUSRAPL AND . . -- SURPLUS F A C I L I T I E S UANAGEMENT PROGRAM ( SFMP ( I S S U E D FOR CLIENT APPROVAL) SF proved by: 2-24-86 D a t e T e c h n i c a l Services D i v i s i o n A p p r o v e d by: 2-24-86 D a t e C o n s t r u c t i o n

  11. Niagara Falls Storage Site, Lewiston, New York: Annual site environmental report, Calendar year 1987: Formerly Utilized Sites Remedial Action Program (FUSRAP)

    SciTech Connect (OSTI)

    Not Available

    1988-04-01

    The monitoring program at the Niagara Falls Storage Site (NFSS) measures radon gas concentrations in air; external gamma radiation levels; and uranium and radium concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard and to assess its potential effect on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, this individual would receive an annual external exposure approximately equivalent to 6 percent of the DOE radiation protection standard of 100 mrem/yr. By comparison, the incremental dose received from living in a brick house versus a wooden house is 10 mrem/yr above background. The cumulative dose to the population within an 80-km (50-mi) radius of the NFSS that would result from radioactive materials present at the site would be indistinguishable from the dose that the same population would receive from naturally occurring radioactive sources. Results of the 1987 monitoring show that the NFSS is in compliance with the DOE radiation protection standard. 13 refs., 10 figs., 20 tabs.

  12. FUSRAP Memorandum of Understanding | Department of Energy

    Energy Savers [EERE]

    Memorandum of Understanding FUSRAP Memorandum of Understanding FUSRAP Memorandum of Understanding PDF icon FUSRAP Memorandum of Understanding More Documents & Publications FUSRAP Memorandum of Understanding Memorandum of Understanding Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers

  13. FUSRAP Memorandum of Understanding | Department of Energy

    Office of Environmental Management (EM)

    Memorandum of Understanding FUSRAP Memorandum of Understanding FUSRAP Memorandum of Understanding PDF icon FUSRAP Memorandum of Understanding More Documents & Publications FUSRAP Memorandum of Understanding Memorandum of Understanding Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers

  14. Reducing Contingency through Sampling at the Luckey FUSRAP Site - 13186

    SciTech Connect (OSTI)

    Frothingham, David; Barker, Michelle; Buechi, Steve; Durham, Lisa

    2013-07-01

    Typically, the greatest risk in developing accurate cost estimates for the remediation of hazardous, toxic, and radioactive waste sites is the uncertainty in the estimated volume of contaminated media requiring remediation. Efforts to address this risk in the remediation cost estimate can result in large cost contingencies that are often considered unacceptable when budgeting for site cleanups. Such was the case for the Luckey Formerly Utilized Sites Remedial Action Program (FUSRAP) site near Luckey, Ohio, which had significant uncertainty surrounding the estimated volume of site soils contaminated with radium, uranium, thorium, beryllium, and lead. Funding provided by the American Recovery and Reinvestment Act (ARRA) allowed the U.S. Army Corps of Engineers (USACE) to conduct additional environmental sampling and analysis at the Luckey Site between November 2009 and April 2010, with the objective to further delineate the horizontal and vertical extent of contaminated soils in order to reduce the uncertainty in the soil volume estimate. Investigative work included radiological, geophysical, and topographic field surveys, subsurface borings, and soil sampling. Results from the investigative sampling were used in conjunction with Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software to update the contaminated soil volume estimate for the site. This updated volume estimate was then used to update the project cost-to-complete estimate using the USACE Cost and Schedule Risk Analysis process, which develops cost contingencies based on project risks. An investment of $1.1 M of ARRA funds for additional investigative work resulted in a reduction of 135,000 in-situ cubic meters (177,000 in-situ cubic yards) in the estimated base volume estimate. This refinement of the estimated soil volume resulted in a $64.3 M reduction in the estimated project cost-to-complete, through a reduction in the uncertainty in the contaminated soil volume estimate and the associated contingency costs. (authors)

  15. Long-Term Surveillance and Maintenance Requirements for Remediated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites Long-Term ...

  16. Utilizing Isotopic Uranium Ratios in Groundwater Evaluations at FUSRAP Sites

    SciTech Connect (OSTI)

    Frederick, W.T.; Keil, K.G.; Rhodes, M.C.; Peterson, J.M.; MacDonell, M.M.

    2007-07-01

    The U.S. Army Corps of Engineers Buffalo District is evaluating environmental radioactive contamination at several Formerly Utilized Sites Remedial Action Program (FUSRAP) sites throughout New York, Pennsylvania, Ohio, and Indiana. The investigations follow the process defined in the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). Groundwater data from the Niagara Falls Storage Site (NFSS) in Lewiston, New York were evaluated for isotopic uranium ratios, specifically uranium-234 versus uranium-238 (U- 234 and U-238, respectively), and the results were presented at Waste Management 2006. Since uranium naturally occurs in all groundwater, it can be difficult to distinguish where low-concentration impacts from past releases differ from the high end of a site-specific natural background range. In natural groundwater, the ratio of U-234 to U-238 exceeds 1 (unity) due to the alpha particle recoil effect, in which U-234 is preferentially mobilized to groundwater from adjacent rock or soil. This process is very slow and may take hundreds to thousands of years before a measurable increase is seen in the natural isotopic ratio. If site releases are the source of uranium being measured in groundwater, the U-234 to U-238 ratio is commonly closer to 1, which normally reflects FUSRAP-related, uranium-contaminated wastes and soils. This lower ratio occurs because not enough residence time has elapsed since the 1940's and 1950's for the alpha particle recoil effect to have significantly altered the contamination-derived ratio. An evaluation of NFSS-specific and regional groundwater data indicate that an isotopic ratio of 1.2 has been identified as a signature value to help distinguish natural groundwater, which may have a broad background range, from zones impacted by past releases. (authors)

  17. FUSRAP Stakeholder Report_3.cdr

    Office of Environmental Management (EM)

    FUSRAP Formerly Utilized Sites Remedial Action Program Stakeholder Report May 2013 ENERGY Legacy Management U.S. DEPARTMENT OF The U.S. Department of Energy (DOE) has operated the Formerly Utilized Sites Remedial Action Program (FUSRAP) since 1974. During that time, we have accomplished many activities to identify and remediate to a safe condition sites that became contaminated with radioactive materials in support of the nation's early atomic energy programs. DOE is responsible for 30

  18. DOE - Office of Legacy Management -- Albany_FUSRAP

    Office of Legacy Management (LM)

    Oregon Albany, Oregon, Site FUSRAP Site albany Background-The Albany, Oregon, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-The Albany Site is owned by the U.S. Bureau of Mines. Metallurgical research was conducted at this site for the U.S. Atomic Energy Commission and the Energy

  19. DOE - Office of Legacy Management -- Oxford_FUSRAP

    Office of Legacy Management (LM)

    Ohio Oxford, Ohio, Site FUSRAP Site Oxford Map Background-The Oxford, Ohio, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission (AEC) operations. History-Uranium metal machining at the Oxford Site from 1952 to 1957 for AEC resulted in contamination of the site and several nearby (vicinity) properties, all of

  20. DOE - Office of Legacy Management -- Adrian_FUSRAP

    Office of Legacy Management (LM)

    Michigan Adrian, Michigan, Site FUSRAP Site adrian Background-The Adrian Site in Adrian, Michigan, was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-The Adrian Site was operated by Bridgeport Brass Company in the 1950s. Uranium metal was extruded at the site for use in the fabrication of fuel

  1. DOE - Office of Legacy Management -- Oakridge_FUSRAP

    Office of Legacy Management (LM)

    Tennessee Oak Ridge, Tennessee, Warehouses Site FUSRAP Site Oak Ridge Warehouses Map Background-The Oak Ridge Warehouses Site, located in Oak Ridge, Tennessee, was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-The Oak Ridge Warehouses Site was used in the early 1940s by the Manhattan Engineer

  2. DOE - Office of Legacy Management -- Seymour_FUSRAP

    Office of Legacy Management (LM)

    Connecticut Seymour, Connecticut, Site FUSRAP Site Seymour Map Background-The Seymour, Connecticut, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission (AEC) operations. History-Research and development of a natural uranium metal extrusion process was performed at the Seymour Site for AEC from 1962 to 1964.

  3. DOE - Office of Legacy Management -- Acid_FUSRAP

    Office of Legacy Management (LM)

    New Mexico Acid/Pueblo Canyon, New Mexico, Site FUSRAP Site Acid/Pueblo Canyon Map Background-The Acid/Pueblo Canyon Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission (AEC) operations. History-The Acid/Pueblo Canyon Site, owned by Los Alamos County, is located in the Pajarito Plateau Region near Los Alamos,

  4. DOE - Office of Legacy Management -- Aliquippa2_FUSRAP

    Office of Legacy Management (LM)

    Pennsylvania Aliquippa, Pennsylvania, Site FUSRAP Site Aliquippa Map Background-The Aliquippa, Pennsylvania, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission (AEC) operations History-At the Aliquippa site, the Vulcan Crucible Steel Company heated and rolled uranium metal into rods for the AEC from 1948 to

  5. DOE - Office of Legacy Management -- Bayo_FUSRAP

    Office of Legacy Management (LM)

    New Mexico Bayo Canyon, New Mexico, Site FUSRAP Site Bayo Canyon Map Background-The Bayo Canyon, New Mexico, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission (AEC) operations. History-The Bayo Canyon Site, owned by Los Alamos County, is located in the Pajarito Plateau Region near Los Alamos, New Mexico.

  6. DOE - Office of Legacy Management -- Brunswick2_FUSRAP

    Office of Legacy Management (LM)

    Jersey New Brunswick, New Jersey, Site FUSRAP Site New Brunswick Map Background-The New Brunswick, New Jersey, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission (AEC) operations. History-From 1948 to 1977, the Manhattan Engineer District and AEC operated the New Brunswick Site as a general nuclear chemistry

  7. DOE - Office of Legacy Management -- BurrisPark_FUSRAP

    Office of Legacy Management (LM)

    California Burris Park, California, Site FUSRAP Site BurrisPark Background- The Burris Park, California, Site is located in Kings County, California, in the Central Valley south of Fresno. The site was remediated by the University of California-Davis and DOE has assumed long-term care responsibilities under the Formerly Utilized Site Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S.

  8. DOE - Office of Legacy Management -- ChicNorth_FUSRAP

    Office of Legacy Management (LM)

    North, Illinois, Site FUSRAP Site Chicago North Map Background-The Chicago North, Illinois, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-The Chicago North Site is owned by the State of Illinois and used as a National Guard Armory. Between 1942 and 1951, the Manhattan Engineer

  9. DOE - Office of Legacy Management -- Chupadera_FUSRAP

    Office of Legacy Management (LM)

    New Mexico Chupadera Mesa, New Mexico, Site FUSRAP Site Chupadera Mesa Map Background-The Chupadera Mesa, New Mexico, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission (AEC) operations. History-The Chupadera Mesa Site is privately owned land northeast of the White Sands Missile Range and the city of Bingham

  10. DOE - Office of Legacy Management -- ColumbusEast_FUSRAP

    Office of Legacy Management (LM)

    Columbus East, Ohio, Site FUSRAP Site Columbus East Map Background-The Columbus East Site in Columbus, Ohio, was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-At the Columbus East Site uranium metal was heated and extruded into rods for the Manhattan Engineer District, contaminating building

  11. DOE - Office of Legacy Management -- Fairfield_FUSRAP

    Office of Legacy Management (LM)

    Fairfield, Ohio, Site FUSRAP Site Fairfield Map Background-The Fairfield, Ohio, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-In 1956, uranium metal was machined and shaped at the site for the U.S. Atomic Energy Commission, contaminating interior building surfaces, drains, equipment,

  12. DOE - Office of Legacy Management -- Indianorchard_FUSRAP

    Office of Legacy Management (LM)

    Massachusetts Indian Orchard, Massachusetts, Site FUSRAP Site Indian Orchard Map Background-The Indian Orchard Site, located in Indian Orchard, Massachusetts, was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-The Indian Orchard Site is privately owned. Interior surfaces of a building at this

  13. DOE - Office of Legacy Management -- NewYork_FUSRAP

    Office of Legacy Management (LM)

    New York, New York, Site FUSRAP Site New York Map Background-The New York, New York, Site, in Manhattan, was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-The New York Site was used by the Manhattan Engineer District in the early 1940s for the short-term storage of uranium concentrates that

  14. DOE - Office of Legacy Management -- Niagara VP_FUSRAP

    Office of Legacy Management (LM)

    Niagara Falls Vicinity Properties, New York, Site FUSRAP Site Niagara Falls Vicinity Properties Map Background-The Niagara Falls Vicinity Properties Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-Niagara Falls Storage Site Vicinity Properties, located near Lewiston, New York, consists

  15. DOE - Office of Legacy Management -- Springdale_FUSRAP

    Office of Legacy Management (LM)

    Pennsylvania Springdale, Pennsylvania, Site FUSRAP Site Springdale Map Background-The Springdale, Pennsylvania, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-The Springdale Site was a privately owned metal fabrication shop that provided uranium metal machining services to the

  16. DOE - Office of Legacy Management -- Tonawanda_FUSRAP

    Office of Legacy Management (LM)

    New York Tonawanda North, New York, Site, Units 1 and 2 FUSRAP Site Tonawanda North Site, Units 1 and 2 Background-Units 1 and 2 of the Tonawanda North, New York, Site were remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-From 1944 to 1946, uranium ore processing residues were transported from

  17. Long Term Stewardship Challenges at the St. Louis District FUSRAP Sites

    SciTech Connect (OSTI)

    Dell'Orco, L.; Chambers, D.

    2002-02-27

    Non-Federally owned radioactively contaminated sites in St. Louis, Missouri are currently being remediated by the St. Louis District Corps of Engineers under the Formerly Utilized Sites Remedial Action Program (FUSRAP). When FUSRAP remediation is complete, inaccessible soils which have levels of contamination greater than unrestricted use standards, will remain. The purpose of this paper is to document the initial challenges facing the project team during its development of the Long Term Stewardship plan for the management of these soils. These soils are located under buildings, roads, railroads and bridges. The Long Term Stewardship plan for the majority of the sites is being developed simultaneously with the remedy selection process. A living document, it will ultimately document the remedial action end state and location of inaccessible soils and implement the plan for ensuring these soils are not a threat to human health and the environment. Although these soils are protective in their current configuration, at some point in time, when activities such as maintenance, utility or property improvement occur, the soils will become accessible and need to be addressed by the federal government. Up until that point in time they will need to be effectively managed to ensure they remain protective. The St. Louis District is in the process of collaboratively developing this plan with its regulators, affected stakeholders and interested parties.

  18. DOE - Office of Legacy Management -- Berkeley_FUSRAP

    Office of Legacy Management (LM)

    California Berkeley, California, Site FUSRAP Site Berkeley Map Background-The Berkeley, California, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-Gilman Hall is a four-story building on the campus of the University of California, Berkeley. Floors, wood sills, walls, and baseboards in

  19. DOE - Office of Legacy Management -- Beverly_FUSRAP

    Office of Legacy Management (LM)

    Massachusetts Beverly, Massachusetts, Site FUSRAP Site Beverly Map Background-The Beverly, Massachusetts, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-From 1942 to 1948, the Metal Hydrides Corporation, which became the Ventron Corporation in 1965, conducted uranium processing

  20. DOE - Office of Legacy Management -- Buffalo_FUSRAP

    Office of Legacy Management (LM)

    York Buffalo, New York, Site FUSRAP Site Buffalo Map Background-The Buffalo, New York, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission (AEC) operations. History-In 1952, the Bliss and Laughlin Steel Company machined and straightened uranium rods under subcontract to National Lead of Ohio, a prime AEC

  1. DOE - Office of Legacy Management -- ChicSouth_FUSRAP

    Office of Legacy Management (LM)

    South, Illinois, Site FUSRAP Site chicagosouth Background-The Chicago South, Illinois, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-In 1941, the National Defense Research Committee contracted the University of Chicago to construct a uranium and graphite pile to investigate the

  2. DOE - Office of Legacy Management -- Granite2_FUSRAP

    Office of Legacy Management (LM)

    Illinois Granite City, Illinois Site FUSRAP Site Granite Map Background-The Granite City Site, located in Granite City, Illinois, was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-In the late 1950s and early 1960s, two federal government-owned betatron particle accelerators were used at the

  3. DOE - Office of Legacy Management -- Hamilton_FUSRAP

    Office of Legacy Management (LM)

    Ohio Hamilton, Ohio, Site FUSRAP Site Hamilton Map Background-The Hamilton, Ohio, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-Intermittently from 1943 to 1951, the Herring-Hall-Marvin Safe Company fabricated slugs from rolled natural uranium metal stock for use by the Manhattan

  4. DOE - Office of Legacy Management -- JerseyCity_FUSRAP

    Office of Legacy Management (LM)

    New Jersey Jersey City, New Jersey, Site FUSRAP Site Jersey City Map Background-The Jersey City, New Jersey, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-The Kellex Corporation was formed in 1943 to conduct engineering research in gaseous diffusion for uranium enrichment for the

  5. DOE - Office of Legacy Management -- Madison_FUSRAP

    Office of Legacy Management (LM)

    Illinois Madison, Illinois, Site FUSRAP Site Madison Map Background-The Madison Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission (AEC) operations. History-During the late 1950s and early 1960s, the Dow Metal Products Division of Dow Chemical Company machined and shaped uranium metal and straightened

  6. DOE - Office of Legacy Management -- Painesville_FUSRAP

    Office of Legacy Management (LM)

    Ohio Painesville, Ohio, Site FUSRAP Site Painesville Background-The Painesville, Ohio, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-In the early 1940s, the Defense Plant Corporation financed construction of a magnesium production facility on property acquired by the federal

  7. DOE - Office of Legacy Management -- Toledo_FUSRAP

    Office of Legacy Management (LM)

    Ohio Toledo, Ohio, Site FUSRAP Site Toledo Map Background-The Toledo, Ohio, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-During the early and mid-1940s, Baker Brothers, Inc., fabricated slugs from natural uranium metal for the Manhattan Engineer District. In 1992, DOE designated the

  8. FRIctl: EUBJEZT: FUSRAP Considered Site Recommendation STATE: B

    Office of Legacy Management (LM)

    FRIctl: EUBJEZT: FUSRAP Considered Site Recommendation STATE: B l ---m-m- Owe,- contacted i \ TYPE OF OPERATION --------------__ * Research & Oevel opmeot + Facility fypm $. Prcducticn scale tasting G Pilct Ecale g Uanufncturinq E Bench 0 University Sca1 e Prccess a Thecretical Studies a Research Crganizaticn il 0 Governmdnt Sponscrrd Faci 1 i ty Sample b Analysis a ather _-b-_----- 0 Prcductien E Disposal /Storage TYP= C' F CCNTRACT ---=--0--------- n Prime Subc=ntract&r G a Purchase

  9. Formerly Utilized Sites Remedial Action Program Fact Sheet

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fact Sheet Uranium Mill Tailings Radiation Control Act Sites This fact sheet provides information about the Formerly Utilized Sites Remedial Action Program sites. When remedial action for a site is complete, the site will be managed under the U.S. Department of Energy Office of Legacy Management. Background The U.S. Atomic Energy Commission (AEC) established the Formerly Utilized Sites Remedial Action Program (FUSRAP) in March 1974 to evaluate radioactive contamination at sites where work was

  10. Formerly Utilized Sites Remedial Action Program Fact Sheet

    Energy Savers [EERE]

    Fact Sheet Uranium Mill Tailings Radiation Control Act Sites This fact sheet provides information about the Formerly Utilized Sites Remedial Action Program sites. When remedial action for a site is complete, the site will be managed under the U.S. Department of Energy Office of Legacy Management. Background The U.S. Atomic Energy Commission (AEC) established the Formerly Utilized Sites Remedial Action Program (FUSRAP) in March 1974 to evaluate radioactive contamination at sites where work was

  11. Formerly Utilized Sites Remedial Action Program Fact Sheet

    Office of Environmental Management (EM)

    Fact Sheet Uranium Mill Tailings Radiation Control Act Sites This fact sheet provides information about the Formerly Utilized Sites Remedial Action Program sites. When remedial action for a site is complete, the site will be managed under the U.S. Department of Energy Office of Legacy Management. Background The U.S. Atomic Energy Commission (AEC) established the Formerly Utilized Sites Remedial Action Program (FUSRAP) in March 1974 to evaluate radioactive contamination at sites where work was

  12. Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program - 12189

    SciTech Connect (OSTI)

    Clayton, Christopher; Kothari, Vijendra; Starr, Ken; Gillespie, Joey; Widdop, Michael; none,

    2012-02-26

    The U.S. Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to address residual radiological contamination at sites where work was performed for the Manhattan Engineer District and U.S. Atomic Energy Commission. Initially, FUSRAP activities began with a records search for sites that had the potential to contain residual radiological contamination; 46 sites were identified that were eligible for and required remediation. Remedial action began in 1979. In 1997, Congress assigned responsibility for the remediation of FUSRAP sites to the U.S. Army Corps of Engineers (USACE). DOE retains responsibility for determining if sites are eligible for FUSRAP remediation and for providing long-term surveillance and maintenance (LTS&M) of remediated FUSRAP sites. DOE LTS&M activities are designed to ensure that FUSRAP sites remain protective of human health and the environment and to preserve knowledge regarding FUSRAP sites. Additional elements include eligibility determinations, transition of remediated sites from USACE to DOE, LTS&M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close coordination with USACE and regulators to ensure there is no loss of protectiveness when sites transition to DOE for LTS&M.

  13. DOE - Office of Legacy Management -- Wayne_FUSRAP

    Office of Legacy Management (LM)

    New Jersey Wayne, New Jersey, Site FUSRAP Site Wayne Map Background-The Wayne, New Jersey, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-Rare Earths, Inc. and then W.R. Grace and Company operated the 6.5-acre site as a rare earth and thorium processing facility from 1948 to 1971.

  14. Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

    SciTech Connect (OSTI)

    Ewy, Ann; Hays, David

    2013-07-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

  15. FINDING OF MD SIGNIFICANT IMPACT FORMERLY UTILIZED HED/AEC SITES REMEDIAL ACTION PROGRAM:

    Office of Legacy Management (LM)

    FINDING OF MD SIGNIFICANT IMPACT FORMERLY UTILIZED HED/AEC SITES REMEDIAL ACTION PROGRAM: BAY0 CANYONS, NEW MEXICO Under the Formerly Utilized Sites Remedial Action Program (FUSRAP), the U.S. Department of Energy (DOE) has proposed to carry out rcmedfrl action at a site located in Bayo Canyon, Los Alamos County, New Mexico. Although the site as partially decontaminated and decommissioned in the 196Os, there remain above-background amounts of radionuclides. DOE has determined that strontium-90 in

  16. Post-Remedial Action Report for the Madison FUSRAP Site

    Office of Legacy Management (LM)

  17. Public Access to FUSRAP Elimination Reports. " D.B. Diggin, HR-83

    Office of Legacy Management (LM)

    'EM-421 ' ' ,y:. .: Public Access to FUSRAP Elimination Reports. " D.B. Diggin, HR-83 !I am attaching reports for the evaluation and elimination of a from the Department's Formerly Utilized Sites Remedial Action .(FUSRAP). Please enter this material into the Public Reading Forrestal Building. This process completes FUSRAP activitjes facilities. Our protocol requires that these records be avail Public Reading Room for at least 3'years; however, if possible retained for five years.' This

  18. Determination of ecologically vital groundwaters at selected sites in the Formerly Utilized Sites Remedial Action Program

    SciTech Connect (OSTI)

    Vinikour, W.S.; Yin, S.C.L.

    1989-08-01

    The US Department of Energy is classifying groundwaters at sites in its Formerly Utilized Sites Remedial Action Program (FUSRAP). Of particular concern is the potential presence of groundwaters that are highly vulnerable to contamination and that are either (1) irreplaceable sources of drinking water or (2) ecologically vital. Conditions at nine FUSRAP sites were evaluated to determine if ecologically vital groundwaters are present. The sites evaluated were Wayne Interim Storage Site, Maywood Interim Storage Site, and Middlesex Sampling Plant in New Jersey; Ashland 2 Site, Seaway Industrial Park, Colonie Interim storage Site, and Niagara Falls Storage Site in New York; and the St. Louis Airport Site and Hazelwood Interim Storage Site in Missouri. The analyses indicated that groundwaters are vulnerable to contamination at all but two of the sites -- the Ashland 2 and Seaway Industrial Park sites in New York. Groundwater discharge points were identified within a 2-mile radius (i.e., the classification review area) of all of the sites. No ecologically vital groundwater areas exist in the vicinities of any of the nine FUSRAP sites evaluated. 35 refs., 17 figs.

  19. FUSRAP Project

    Office of Legacy Management (LM)

    Project 23b 14501 FUSRAP TECHNICAL BULLETIN N O . - R 3 v . L DATE: 1.2 9-99 SUBJECT : Pr.pec.d BY T r m L u d Approval Summary of the results for the Springdale characterization activities performed per WI-94-015, Rev. 0. TUO separate radiological characterization surveys and a limited cherical characterization survey were performed on the Springdale Site in Octcjer and December, 1993. The design of the radiological surveys were to supplement and define existing ORNL surveys. The limited

  20. St. Louis FUSRAP-A Strategy for Success

    SciTech Connect (OSTI)

    Lyerla, M.; Fox, B.; Chinnock, J.; Haase, A.; Wojinski, S.; Bretz, M.; Cotner, S.; Dellorco, L.; Mueller, D.; Roberts, S.; Overmohle, D.

    2002-02-27

    In October 1997, Congress transferred the Formerly Utilized Sites Remedial Action Program (FUSRAP) from the Department of Energy (DOE) to the United States Army Corps of Engineers (USACE). FUSRAP addresses contamination generated by activities of the Manhattan Engineering District and the Atomic Energy Commission during the 1940's and 50's in support of the nation's nuclear weapons development program. The USACE Operation Order for FUSRAP gave responsibility for remediation of five sites in Missouri and Illinois to the USACESt. Louis District. The principal site is the St. Louis Airport Site (SLAPS), which involves the removal, transportation, disposal, and restoration of approximately 28 acres and 245,000 bank cubic yards (bcy) of contaminated soils. This paper will focus on the progress and achievements in removal action efficiencies of the SLAPS team. This team consists primarily of the USACE and Stone & Webster, Incorporated.

  1. Description of the Formerly Utilized Sites Remedial Action Program

    SciTech Connect (OSTI)

    Not Available

    1980-09-01

    The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed.

  2. Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program -12184

    SciTech Connect (OSTI)

    Clayton, Christopher; Kothari, Vijendra; Starr, Ken; Widdop, Michael; Gillespie, Joey

    2012-02-26

    The U. S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collection adequately described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS&M) program: ? Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. ? DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. ? DOE must continue to maintain constructive relationships with the U.S. Army Corps of Engineers and state and federal regulators.

  3. NE-24 R&D Decontamination Projects Under the Formerly Utilized Sites Remedial

    Office of Legacy Management (LM)

    " _ ,' ,:.' : NE-24 R&D Decontamination Projects Under the Formerly Utilized Sites Remedial Action Program (FUSRAP) '. * * ,~~'.'J.' L.aGrone, Manager Oak Ridge Operations O fffce As a result of the House-Senate Conference Report and the Energy and W a ter Appropriations Act for FY 1984, and based on the data in the attached reports indicating radioactive contamination In excess of acceptable guidelines, the sites listed In the attachment and their respectfve vicinity properties

  4. Quantifying Contaminant Mass for the Feasibility Study of the DuPont Chambers Works FUSRAP Site - 13510

    SciTech Connect (OSTI)

    Young, Carl; Rahman, Mahmudur; Johnson, Ann; Owe, Stephan

    2013-07-01

    The U.S. Army Corps of Engineers (USACE) - Philadelphia District is conducting an environmental restoration at the DuPont Chambers Works in Deepwater, New Jersey under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Discrete locations are contaminated with natural uranium, thorium-230 and radium-226. The USACE is proposing a preferred remedial alternative consisting of excavation and offsite disposal to address soil contamination followed by monitored natural attenuation to address residual groundwater contamination. Methods were developed to quantify the error associated with contaminant volume estimates and use mass balance calculations of the uranium plume to estimate the removal efficiency of the proposed alternative. During the remedial investigation, the USACE collected approximately 500 soil samples at various depths. As the first step of contaminant mass estimation, soil analytical data was segmented into several depth intervals. Second, using contouring software, analytical data for each depth interval was contoured to determine lateral extent of contamination. Six different contouring algorithms were used to generate alternative interpretations of the lateral extent of the soil contamination. Finally, geographical information system software was used to produce a three dimensional model in order to present both lateral and vertical extent of the soil contamination and to estimate the volume of impacted soil for each depth interval. The average soil volume from all six contouring methods was used to determine the estimated volume of impacted soil. This method also allowed an estimate of a standard deviation of the waste volume estimate. It was determined that the margin of error for the method was plus or minus 17% of the waste volume, which is within the acceptable construction contingency for cost estimation. USACE collected approximately 190 groundwater samples from 40 monitor wells. It is expected that excavation and disposal of contaminated soil will remove the contaminant source zone and significantly reduce contaminant concentrations in groundwater. To test this assumption, a mass balance evaluation was performed to estimate the amount of dissolved uranium that would remain in the groundwater after completion of soil excavation. As part of this evaluation, average groundwater concentrations for the pre-excavation and post-excavation aquifer plume area were calculated to determine the percentage of plume removed during excavation activities. In addition, the volume of the plume removed during excavation dewatering was estimated. The results of the evaluation show that approximately 98% of the aqueous uranium would be removed during the excavation phase. The USACE expects that residual levels of contamination will remain in groundwater after excavation of soil but at levels well suited for the selection of excavation combined with monitored natural attenuation as a preferred alternative. (authors)

  5. Post-Remedial Action Report the Chapman Valve Site E I P I I

    Office of Legacy Management (LM)

    for Post-Remedial Action Report the Chapman Valve Site E I P I I I t I 1 I I I 1 I li I I Pnnted on recycledkecyclable paper 24 19 0186 1 DOE/OW21949-408 Formerly Utilized Sites Remed Contr: al Action Program (FUSRAP) L C t NO. DE-AC05-91 OR21 949 Indian Orchard, assac h.usetts November 1996 DOE/OR/2 1949-408 POST-REMEDIAL ACTION REPORT FOR THE CHAPMAN VALVE SITE INDIAN ORCHARD, MASSACHUSETTS NOVEMBER 1996 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract

  6. Effect of soil erosion on the long-term stability of FUSRAP near-surface waste-burial sites

    SciTech Connect (OSTI)

    Knight, M.J.

    1983-04-01

    Decontamination of FUSRAP sites could result in the generation of large volumes (in excess of 400,000 m/sup 3/) of low-activity radioactive wastes (primarily contaminated soil and building materials) requiring subsequent disposal. It is likely that near-surface burial will be seriously considered as an option for disposal of these materials. A number of factors - including soil erosion - could adversely affect the long-term stability of a near-surface waste-burial site. The majority of FUSRAP sites are located in the humid eastern United States, where the principal cause of erosion is the action of water. This report examines the effect of soil erosion by water on burial-site stability based on analysis of four hypothetical near-surface burial sites. The Universal Soil Loss Equation was employed to estimate average annual soil loss from burial sites and the 1000-year effects of soil loss on the soil barrier (burial trench cap) placed over low-activity wastes. Results suggest that the land use of the burial site and the slope gradient of the burial trench cap significantly affect the rate of soil erosion. The development of measures limiting the potential land use of a burial site (e.g., mixing large rocks into the burial trench cap) may be required to preserve the integrity of a burial trench for long periods of time.

  7. Federal government information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    Not Available

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains a summary of the organization and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant federal statutes and regulations.

  8. Recent Developments in DOE FUSRAP - 13014

    SciTech Connect (OSTI)

    Clayton, Christopher; Kothari, Vijendra; Hooten, Gwen; Starr, Ken; Bahrke, Cheri; Gillespie, Joey; Widdop, Michael; Darr, Bob

    2013-07-01

    The DOE Office of Legacy Management assumed responsibility for the DOE FUSRAP in 2003. Since then, DOE has evaluated existing guidance and program needs to ensure that the program will remain effective in maintaining protectiveness at remediated FUSRAP sites. DOE has identified crucial elements that must be addressed to meet this goal. Knowledge of the sites and the program must be preserved and accessible to future custodians. Program processes must be defined and coordinated with other agencies. Long-term surveillance and maintenance (LTS and M) requirements for the sites must be based on human health risk and regulatory compliance, and those requirements must be well defined. Useful and accurate program information must be available to stakeholders. DOE has addressed these needs through development of a comprehensive program plan, an LTS and M plan for each completed FUSRAP site, a records finding aid, and a public information web site. These developments help ensure that the current knowledge is preserved and passed on to future custodians and stakeholders. (authors)

  9. Iowa state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1981-02-09

    This volume is one of a series produced under contract with the DOE, By Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Iowa. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.

  10. U.S. Army Corps of Engineers Sites

    Broader source: Energy.gov [DOE]

    In 1997, Congress directed the U.S. Army Corps of Engineers (USACE) to conduct assessment, remedial action, and site closure activities for Formerly Utilized Sites Remedial Action Program (FUSRAP)...

  11. Missouri State information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations, and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations.

  12. Long-Term Surveillance and Maintenance Requirements for Remediated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements for Remediated FUSRAP Sites Long-Term Surveillance and Maintenance ... to the U.S. Department of Energy (DOE) for long-term surveillance and maintenance (LTS&M). ...

  13. LM FUSRAP Fact Sheet | Department of Energy

    Energy Savers [EERE]

    FUSRAP Fact Sheet LM FUSRAP Fact Sheet LM FUSRAP Fact Sheet PDF icon LM FUSRAP Fact Sheet More Documents & Publications FUSRAP Stakeholder Report FUSRAP Memorandum of Understanding FUSRAP Memorandum of Understanding

  14. Nuclear facility decommissioning and site remedial actions

    SciTech Connect (OSTI)

    Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

    1990-09-01

    The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

  15. Alternatives for management of wastes generated by the formerly utilized sites remedial action program and supplement

    SciTech Connect (OSTI)

    Gilbert, T.L.; Peterson, J.M.; Vocke, R.W.; Alexander, J.K.

    1983-03-01

    Alternatives for disposal or stabilization of the wastes generated by the US Department of Energy's Formerly Utilized Sites Remedial Action Program (FUSRAP) are identified and compared, with emphasis on the long-term aspects. These wastes consist of soil material and rubble containing trace amounts of radionuclides. A detailed pathway analysis for the dose to the maximally exposed individual is carried out using an adaptation of the natural analogue method. Comparisons of the different alternatives, based on the results of the pathway analysis and qualitative cost considerations, indicate that, if the hazard is such that the wastes must be removed and disposed of rather than stabilized in place, disposal by immediate dispersal is preferable to containment, and containment followed by slow planned dispersal is preferable to containment without dispersal. The Supplement presents refinements of work that was reported at the 1982 International Decommissioning Symposium. The new material consists of revisions of the estimates of the predicted potential dose to the maximally exposed individual and a more detailed comparative assessment of the radiological impacts of alternatives for management of wastes generated by the US Department of Energy's Formerly Utilized Sites Remedial Action Program (FUSRAP).

  16. REPLY TO AllNOF: EM-421 SUBJECT: The File TO: Elimination of the DuBois Chemical Company Site from FUSRAP

    Office of Legacy Management (LM)

    q.w -' -fihsw+P 8063 6H-j DOEF 1325.8 . 8 @w - bnited States Government - Department of Energy memorandum DATE: DEC 14 1990 REPLY TO AllNOF: EM-421 SUBJECT: The File TO: Elimination of the DuBois Chemical Company Site from FUSRAP I have reviewed the attached preliminary site summary and recommendation for the DuBois Chemical Company site in Cincinnati. I have determined that there is little likelihood of contamination at this site. Based on the above, the DuBois Chemical Company Site is hereby

  17. NE-23 List of California Sites Hattie Carwell. SAN/NSQA Division

    Office of Legacy Management (LM)

    Hattie Carwell. SAN/NSQA Division Attached for your information is the list Of Callfornia sites we identified in our search of Manhattdn Engineer District records for the Formerly Utilized Sites Remedial Action Program (FUSRAP). None of the facilities listed qualified for FUSRAP. The only site in California that was included in FUSRAP was Gilman Hall on the University of California-Berkeley Campus. All California sites that are in our Surplus Facilities Management Program are under San Francisco

  18. NE-23 List of California Sites NE-23 Hattie Car-well, SAN/NSQA Division

    Office of Legacy Management (LM)

    NE-23 Hattie Car-well, SAN/NSQA Division Attached for your information is the list of California sites we identified in our search of Manhattdn Engineer District records for the Formerly Utilized Sites Remedial Action Program (FUSRAP). None of the facilities listed qualified"fbr'FUSRAP:'~- The only site in California,that was included in FUSRAP was Gilman Hall on the University of California-Berkeley Campus. All California sites that are in our Surplus Facilities Management Prcgram are

  19. Nuclear facility decommissioning and site remedial actions

    SciTech Connect (OSTI)

    Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

    1989-09-01

    The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

  20. Observational Approach to Chromium Site Remediation - 13266

    SciTech Connect (OSTI)

    Scott Myers, R.

    2013-07-01

    Production reactors at the U.S. Department of Energy's (DOE) Hanford Site in Richland, Washington, required massive quantities of water for reactor cooling and material processing. To reduce corrosion and the build-up of scale in pipelines and cooling systems, sodium dichromate was added to the water feedstock. Spills and other releases at the makeup facilities, as well as leaks from miles of pipelines, have led to numerous areas with chromium-contaminated soil and groundwater, threatening fish populations in the nearby Columbia River. Pump-and-treat systems have been installed to remove chromium from the groundwater, but significant contamination remain in the soil column and poses a continuing threat to groundwater and the Columbia River. Washington Closure Hanford, DOE, and regulators are working on a team approach that implements the observational approach, a strategy for effectively dealing with the uncertainties inherent in subsurface conditions. Remediation of large, complex waste sites at a federal facility is a daunting effort. It is particularly difficult to perform the work in an environment of rapid response to changing field and contamination conditions. The observational approach, developed by geotechnical engineers to accommodate the inherent uncertainties in subsurface conditions, is a powerful and appropriate method for site remediation. It offers a structured means of quickly moving into full remediation and responding to the variations and changing conditions inherent in waste site cleanups. A number of significant factors, however, complicate the application of the observational approach for chromium site remediation. Conceptual models of contamination and site conditions are difficult to establish and get consensus on. Mid-stream revisions to the design of large excavations are time-consuming and costly. And regulatory constraints and contract performance incentives can be impediments to the flexible responses required under the observational approach. The WCH project team is working closely with stakeholders and taking a number of steps to meet these challenges in a continuing effort to remediate chromium contaminated soil in an efficient and cost-effective manner. (authors)

  1. Salmon Site Remedial Investigation Report, Exhibit 2

    SciTech Connect (OSTI)

    USDOE NV

    1999-09-01

    This Salmon Site Remedial Investigation Report provides the results of activities initiated by the U.S. Department of Energy (DOE) to determine if contamination at the Salmon Site poses a current or future risk to human health and the environment. These results were used to develop and evaluate a range of risk-based remedial alternatives. Located in Lamar County, Mississippi, the Salmon Site was used by the U.S. Atomic Energy Commission (predecessor to the DOE) between 1964 and 1970 for two nuclear and two gas explosions conducted deep underground in a salt dome. The testing resulted in the release of radionuclides into the salt dome. During reentry drilling and other site activities, liquid and solid wastes containing radioactivity were generated resulting in surface soil and groundwater contamination. Most of the waste and contaminated soil and water were disposed of in 1993 during site restoration either in the cavities left by the tests or in an injection well. Other radioactive wastes were transported to the Nevada Test Site for disposal. Nonradioactive wastes were disposed of in pits at the site and capped with clean soil and graded. The preliminary investigation showed residual contamination in the Surface Ground Zero mud pits below the water table. Remedial investigations results concluded the contaminant concentrations detected present no significant risk to existing and/or future land users, if surface institutional controls and subsurface restrictions are maintained. Recent sampling results determined no significant contamination in the surface or shallow subsurface. The test cavity resulting from the experiments is contaminated and cannot be economically remediated with existing technologies. The ecological sampling did not detect biological uptake of contaminants in the plants or animals sampled. Based on the current use of the Salmon Site, the following remedial actions were identified to protect both human health and the environment: (1) the installation of a water supply system that will provide potable water to the site and residence in the proximity to the site; (2) continued maintenance of surface institutional controls and subsurface restrictions; and (3) continue to implement the long-term hydrologic monitoring program. The Salmon Site will be relinquished the State of Mississippi as mandated by Public Law 104-201-September 23, 1996, to be used as a demonstration forest/wildlife refuge. Should the land use change in the future and/or monitoring information indicates a change in the site conditions, the DOE will reassess the risk impacts to human health and the environment.

  2. DOE/OR/20722-84 Formerly Utilized Sites Remedial Action Program

    Office of Legacy Management (LM)

    ur/ /1-( DOE/OR/20722-84 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-81 OR2A7 22 IPOST-RE M ED"LA'KtrACTI O N R EPORT FOR i ; , , i ' l : l ' - . . - r r r ^ A ^ R ^ l - l r I A F f - F A F f A A F 6 l T F i'. THE NIAGARA FALLS STORAGE SITE IICINITY PROPERTIES 1983 AND 1984 Lewistoh, New York December 1986 Bechtel lrlatbnal, Ine DOE/OR/ 207 22-8 4 P O S T - R E M E D I A L A C T I O N R E P O R T F O R T H E N ] A G A R A F A L L S S T O R A G E S I T E V I

  3. Remediation of Soil at Nuclear Sites

    SciTech Connect (OSTI)

    Holmes, R.; Boardman, C.; Robbins, R; Fox, Robert Vincent; Mincher, Bruce Jay

    2000-03-01

    As the major nuclear waste and decontamination and decommissioning projects progress, one of the remaining problems that faces the nuclear industry is that of site remediation. The range of contamination levels and contaminants is wide and varied and there is likely to be a significant volume of soil contaminated with transuranics and hazardous organic materials that could qualify as mixed TRU waste. There are many technologies that offer the potential for remediating this waste but few that tackle all or most of the contaminants and even fewer that have been deployed with confidence. This paper outlines the progress made in proving the ability of Supercritical Fluid Extraction as a method of remediating soil, classified as mixed (TRU) transuranic waste.

  4. Remediation of soil at nuclear sites

    SciTech Connect (OSTI)

    R. Holmes; C. Boardman; R. Robbins; R. Fox; B. J. Mincher

    2000-02-28

    As the major nuclear waste and decontamination and decommissioning projects progress, one of the remaining problems that faces the nuclear industry is that of site remediation. The range of contamination levels and contaminants is wide and varied and there is likely to be a significant volume of soil contaminated with transuranics and hazardous organic materials that could qualify as mixed TRU waste. There are many technologies that offer the potential for remediating this waste but few that tackle all or most of the contaminants and even fewer that have been deployed with confidence. This paper outlines the progress made in proving the ability of Supercritical Fluid Extraction as a method of remediating soil, classified as mixed (TRU) transuranic waste

  5. 9/03/1998 08: 31 4234814757 SAIC _ FUSRAP

    Office of Legacy Management (LM)

    9/03/1998 08: 31 4234814757 SAIC _ FUSRAP ti y. is%-! PAGE 05 Authorization for Remedial Actioll at the Scaway.Industrlrl I. -Col',(I):Sjtts at Tonawanda, KY, and Mallbtckrodt Chemical Park and Ashland 0 . I ,:. ,..( ).._. - ,' . . : f , '.j'; IJ~~;'ia#.3~ ;;;k6';&& : : ~ ; ,Oak Ridge 8ptrrtlons'Off1ct ', . .i:. .' ,.: . : .- :/ :., +,havc'dttt*intd ' that tht subject radioactive material as a result EnergjXZniss~on operations at 1:hose sites. ins contamination is In: .:: I, k!xcess.of

  6. Supplement No. 1 to the FUSRAP Summary Protocol - Designation/Elimination

    Energy Savers [EERE]

    Protocol | Department of Energy 1 to the FUSRAP Summary Protocol - Designation/Elimination Protocol Supplement No. 1 to the FUSRAP Summary Protocol - Designation/Elimination Protocol Supplement No. 1 to the FUSRAP Summary Protocol - Designation/Elimination Protocol (January 1986) PDF icon Supplement No. 1 to the FUSRAP Summary Protocol - Designation/Elimination Protocol (January 1986) More Documents & Publications Summary Protocol: Identification, Characterization, Designation, Remedial

  7. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM

    Office of Legacy Management (LM)

    . FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM 'FOR , ELW~~I~NREPORT FOR&fERMCKINNEYTOOLANDMANUFACT@INGCC)&iPANY ~. 1688 ARAB,EkLA ROiD CL&VELAND,OHIO ,,, .I _. .' , Jaquary 1994 ,. I U. S . De@rtment of Energy Office ,of EnvironFental Restoration ' ,' I ,,' ' , i ., ; 1 ! i ' , ' . 1 .' ( ,. ,' ," ' .~ : "' ; ,' . ' _ EliminationReport~ .' _. 5' Former McKhmey Tool add Manufacturing Company: " ' . ..,' : ., 8. ,, .: _, :. TABLE OF CONTENTS - i. /i 1' JN'

  8. New Mexico state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    2014-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  9. New Jersey state information handbook: Formerly Utilized Sites Remedial Action Program

    SciTech Connect (OSTI)

    1980-10-31

    Under the implied authority of the Atomic Energy Act of 1954, as amended, radiological surveys and research work has been conducted to determine radiological conditions at former MED/AEC sites. As of this time, 31 sites in 13 states have been identified that require or may require remedial action. This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of New Jersey. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations. The loose-leaf format used in these volumes will allow the material to be updated periodically as the Remedial Action Program progresses.

  10. Using the Conceptual Site Model to Remediate Two Sites in New England and Reach License Termination and Site Reuse

    SciTech Connect (OSTI)

    Glucksberg, Nadia; Peters, Jay

    2008-01-15

    The Conceptual Site Model (CSM) is a powerful tool for understanding the link between contamination sources, cleanup objectives, and ultimate site reuse. The CSM describes the site setting, geology, hydrogeology, potential sources, release mechanisms and migration pathways of contaminants. The CSM is needed to understand the extent of contamination and how receptors may be exposed to both radiological and chemical constituents. A key component of the CSM that is often overlooked concerns how the regulatory requirements drive remediation and how each has to be integrated into the CSM to ensure that all stakeholder requirements are understood and addressed. This paper describes how the use of the CSM helped reach closure and reuse at two facilities in Connecticut that are pursuing termination of their Nuclear Regulatory Commission (NRC) license. The two facilities are the Combustion Engineering Site, located in Windsor, Connecticut, (CE Windsor Site) and the Connecticut Yankee Atomic Power Company, located in Haddam Neck, Connecticut (CYAPCO). The closure of each of these facilities is regulated by four agencies: - Nuclear Regulatory Commission (NRC) - which requires cleanup levels for radionuclides to be protective of public health; - US Environmental Protection Agency (USEPA) - which requires cleanup levels for chemicals to be protective of public health and the environment; - Connecticut Department of Environmental Protection (CTDEP) Bureau of Air Management, Radiation Division - which requires cleanup levels for radionuclides to be protective of public health; and - Connecticut Department of Environmental Protection (CTDEP) Bureau of Water Protection and Land Reuse - which requires cleanup levels for chemicals to be protective of public health and the environment. Some of the radionuclides at the CE Windsor Site are also regulated under the Formerly Utilized Site Remedial Action Program (FUSRAP) under the Army Corps of Engineers. The remainder of this paper presents the similarities and differences between the CSMs for these two sites and how each site used the CSM to reach closure. Although each of these site have unique histories and physical features, the CSM approach was used to understand the geology, hydrogeology, migration and exposure pathways, and regulatory requirements to successfully characterize and plan closure of the sites. A summary of how these attributes affected site closure is provided.

  11. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    \ ,.-c , 2 2 a. . FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM . ELIMINATION REPORT FOR THE FORMER GENERAL SERVICES ADMINISTRATION 39TH STREET WAREHOUSE 1716 PERSHING ROAD CHICAGO, ILLINOIS SEP301985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects __--... -_ -._.-_- _"_-. .___.. -... .._ ..-. .-. ..--- . , ' , CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological

  12. Florida state information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1981-02-27

    This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the federal and state levels, the pertinent programs they administer, each affected state legislature, and current federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Florida. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  13. Maryland State information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Handbook Series Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  14. Salmon Site Remedial Investigation Report - Volume I

    Office of Legacy Management (LM)

    494-VOL I/REV 1 U.S. Department of Energy Nevada Operations Office E nv i r onm ent al R es t or at i on D i v i s i on N ev ada E nv i r onm ent al R es t or at i on Pr oj ect S al m on S i t e R em edi al Inv es t i gat i on R epor t Vol u m e I R ev i s i on N o. : 1 S ept em ber 1999 Approved for public release; further dissemination unlimited. This page intentionally left blank DOE/NV--494-VOL I/REV 1 SALMON SITE REMEDIAL INVESTIGATION REPORT DOE Nevada Operations Office Las Vegas, Nevada

  15. FORMERLY REMEDIAL UTILIZED SITES ACTION PROGRAM ELIMINATION REPORT ELIMINATION REPORT

    Office of Legacy Management (LM)

    (' . . FORMERLY REMEDIAL UTILIZED SITES ACTION PROGRAM ELIMINATION REPORT ELIMINATION REPORT FORMER VITRO LABORATORIES FORMER VITRO LABORATORIES VITRO CORPORATION VITRO CORPORATION WEST ORANGE, NEW JERSEY WEST ORANGE, NEW JERSEY SEP 30 1985 SEP 30 1985 Department of Energy Office of Nuclear Waste Office of Remedial Action and Waste Technology Division of Facility and Site Deconxnissioning Projects . CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status

  16. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM . ELIMINATION REPORT FOR AL-TECH SPECIALTY STEEL CORPORATION (THE FORMER ALLEGHENY-LUDLUM STEEL CORPORATION) _ WATERYLIET, NEW YORK, AND DUNKIRK, NEW YORK SEP 301985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects ----- ----_l_.._- .._. _- CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION

  17. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    I c. ,..I -. i FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR BRIDGEPORT BRASS COMPANY HAVENS LABORATORY (REACTIVE METALS, INC.) KOSSUTH AND PULASKI STREETS BRIDGEPORT, CONNECTICUT i Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decomnissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 . 2 ii

  18. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    itI.2 -2 FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR THE FORMER BRUSH BERYLLIUM COMPANY CLEVELAND, OHIO Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects __I__,_-. - ---.. ____- .- CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Pa e -5 2 2 2 4 4 4 ii ELIMINATION REPORT THE FORMER BRUSH

  19. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    -p,l-I . . FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR MOBIL MINING AND MINERALS COMPANY (THE FORMER MATHIESON CHEMICAL COMPANY) PASADENA, TEXAS D Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 2 2 2 3 3 4 ii --. ELIMINATION REPORT MOBIL

  20. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    fi.q 2, I: * FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT EAST PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects INTRODUCTION BACKGROUND CONTENTS Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 4 iii ELIMINATION REPORT

  1. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM - ELIMINATION REPORT FOR

    Office of Legacy Management (LM)

    - ELIMINATION REPORT FOR . UNIVERSITY OF NEVADA MACKAY SCHOOL OF MINES RENO, NEVADA s,d k I",, ici ;3J(, i Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES 1 , Page . 1 2 2 2' 3 3 iii The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action

  2. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    NATIONAL BUREAU OF STANDARDS BUILDINGS VAN NESS STREET WASHINGTON, D.C. Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects - __-~---- -._.. .._ .-. .- INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status CONTENTS ELIMINATION ANALYSIS REFERENCES ii Paqe 1 4 INiRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste

  3. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    ,: /A (,) i_ - z FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR FORMERLY UTILIZED PORTIONS OF THE WATERTOWN ARSENAL WATERTOWN, MASSACHUSETTS Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decotwnissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Radiological History and Status ELIMINATION ANALYSIS Findings and Recommendation 6 REFERENCES iii Page 1 1 1 3 4 7 "..*.w..,, -. ._

  4. Implementation of the Formerly Utilized Sites Remedial Action Program:

    Office of Environmental Management (EM)

    Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers | Department of Energy Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers Implementation of the Formerly Utilized Sites Remedial Action

  5. Targeted Health Assessment for Wastes Contained at the Niagara Falls Storage Site to Guide Planning for Remedial Action Alternatives - 13428

    SciTech Connect (OSTI)

    Busse, John; Keil, Karen; Staten, Jane; Miller, Neil; Barker, Michelle; MacDonell, Margaret; Peterson, John; Chang, Young-Soo; Durham, Lisa

    2013-07-01

    The U.S. Army Corps of Engineers (USACE) is evaluating potential remedial alternatives at the 191-acre Niagara Falls Storage Site (NFSS) in Lewiston, New York, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) brought radioactive wastes to the site during the 1940's and 1950's, and the U.S. Department of Energy (US DOE) consolidated these wastes into a 10-acre interim waste containment structure (IWCS) in the southwest portion of the site during the 1980's. The USACE is evaluating remedial alternatives for radioactive waste contained within the IWCS at the NFSS under the Feasibility Study phase of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process. A preliminary evaluation of the IWCS has been conducted to assess potential airborne releases associated with uncovered wastes, particularly during waste excavation, as well as direct exposures to uncovered wastes. Key technical issues for this assessment include: (1) limitations in waste characterization data; (2) representative receptors and exposure routes; (3) estimates of contaminant emissions at an early stage of the evaluation process; (4) consideration of candidate meteorological data and air dispersion modeling approaches; and (5) estimates of health effects from potential exposures to both radionuclides and chemicals that account for recent updates of exposure and toxicity factors. Results of this preliminary health risk assessment indicate if the wastes were uncovered and someone stayed at the IWCS for a number of days to weeks, substantial doses and serious health effects could be incurred. Current controls prevent such exposures, and the controls that would be applied to protect onsite workers during remedial action at the IWCS would also effectively protect the public nearby. This evaluation provides framing context for the upcoming development and detailed evaluation of remedial alternatives for the IWCS. (authors)

  6. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR OCCIDENTAL CHEMICAL CORPORATION ( FORMER HOOKER ELECTROCHEMICAL COMPANY ) NIAGARA FALLS, NEW YORK SEP 30 1985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects ELIMINATION REPORT FOR OCCIDENTAL CHEMICAL CORPORATION (FORMER HOOKER ELECTROCHEMICAL COMPANY) L NIAGARA FALLS, NEW YORK- INTRODUCTION The Department ' of Energy (DDE),

  7. FORMERLY USED SITES REMEDIAL ACTION PROGRAM DESIGNATION SUMMARY

    Office of Legacy Management (LM)

    USED SITES REMEDIAL ACTION PROGRAM DESIGNATION SUMMARY FOR ALBA CRAFT LABORATORY OXFORD, OHIO October 1, 1992 U.S. DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL RESTORATION Designation Summary Alba Craft Laboratory. Oxford CONTENTS INTRODUCTION .......... . . ..................... 1 BACKGROUND Site Function ......................... Site Description ..................... 1 Owner History ................. .. 2 Radiological History and Status............ 2 Authority Review .................... .. 3

  8. FORMERLY REMEDIAL UTILIZED SITES ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    REMEDIAL UTILIZED SITES ACTION PROGRAM ELIMINATION REPORT FOR FORMER CARPENTER STEEL COMPANY; 101 WEST BERN STREET; READING, PENNSYLVANIA December 1991 U.S. Department of Energy Office of Environmental Restoration Elimination Report Former Carpenter Steel Company CONTENTS INTRODUCTION ........................... 1 BACKGROUND ............................ 1 Site Function ......................... Site Description. ....................... : Radiological History and Status ................ 2

  9. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    INTERNATIONAL MINERALS AND CHEMICAL CORPORATION MULBERRY, FLORIDA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects INTRODUCTION BACKGROUND CONTENTS Site Function ' Site Description Radiological History and Status ELIMINATION ANALYSIS Summary of Findings REFERENCES . Page 1 2 --.- 2 -- - : 4 7 7 ii ELIMINATION REPORT INTERNATIONAL MINERALS AND CHEMICAL CORPORATION MULBERRY, FLORIDA l INTRODUCTION

  10. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    CF INDUSTRIES, INC. ( THE FORMER INTERNATIONAL MI NERALS AND CHEMICAL CORPORATION) BARTON, FLORIDA Department of Energy Office of Nuclear Energy. Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects - - .._. ..--.. . . I."__ . - INTRODUCTION CONTENTS Page BACKGROUND Site Function Site Description Radiological. History and Status ELIMINATION ANALYSIS REFERENCES Summary of Findings ii 7 8 --..I--- - ..-___-_--.___-"-- -- ' . ELIMINATION

  11. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    < .. ,:. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR JESSOP STEEL COMPANY; 500 GREEN STREET: WASHINGTON, PENNSYLVANIA December 1991 U.S. Department of Energy Office of Environmental Restoration Elimination Report Jessop Steel Company CONTENTS INTRODUCTION ...................... .'. .... 1 BACKGROUND ............................. 1 Site Function Site Description : : : : : : : .................................... : Radiological History and Status ................. 2

  12. FUSRAP Program Information | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplement No. 2 to the FUSRAP Summary Protocol - Verification and Certification Protocol (November 1985, Rev. 1) Conference Papers Recent Developments in DOE FUSRAP (Waste ...

  13. Interstate Technology & Regulatory Council (ITRC) Remediation Management of Complex Sites: Case Studies and Guidance

    Broader source: Energy.gov [DOE]

    Interstate Technology & Regulatory Council (ITRC) Remediation Management of Complex Sites: Case Studies and Guidance

  14. Designation of Sites for Remedial Action - Metal Hydrides, Beverly,

    Office of Legacy Management (LM)

    T: Designation of Sites for Remedial Action - Metal Hydrides, Beverly, MA; Bridgeport Brass, Adrian, MI and Seymour, Chicago, IL CT; National Guard Armory, 0: Joe LaGrone, Manager Oak Ridge Operations Office Based on the attached radiological survey data (Attachments 1 through 3) and an appropriate authority review, the following properties are being authorized for remedial action. It should be noted that the attached survey data are for designation purposes only and that Bechtel National, Inc.

  15. Environmental surveillance results for 1994 for the Hazelwood Interim Storage Site. FUSRAP technical memorandum Number 140-95-011

    SciTech Connect (OSTI)

    Szojka, S.

    1995-06-01

    This report presents analytical results and an interpretation of the results for samples collected as part of the 1994 environmental surveillance program for the Hazelwood Interim Storage Site (HISS) for the interim storage of radiologically contaminated soils. The discussion provides a comparative analysis of local background conditions and applicable regulatory criteria to results reported for external gamma radiation and for samples from the media investigated (air, surface water, sediment, groundwater, and stormwater). Results from the 1994 environmental surveillance program at HISS indicate that Department of Energy (DOE) guidelines were not exceeded for the calculated airborne particulate dose or for the monitored constituents.

  16. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    REMEDIAL ACTION PROGRAM ELIMINATION REPORT SONABOND ULTRASONICS FORMERLY AEROPROJECTS, INC. 200-T E. ROSEDALE AVENUE WEST CHESTER,~PENNSYLVANIA December 1991 U.S. Department of Energy Office of Environmental Restoration and Waste Management Office of Environmental Restoration Office of Eastern Area Programs . . . CONTENTS INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . Site Function Site Description Radiological History and

  17. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado: Final report

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    This volume contains Appendix F, bid schedule and specifications for remedial action on three sites: Old Rifle processing site; New Rifle processing site and Estes Gulch disposal site.

  18. Microsoft Word - FUSRAP Middlesex NJ.doc

    Office of Legacy Management (LM)

    Engineers® New York District FUSRAP Middlesex Sampling Plant (MSP) Middlesex, New Jersey FACT SHEET January 2004 DESCRIPTION: The Middlesex Sampling Plant is located at 239 Mountain Avenue in Middlesex, New Jersey. The facility, which includes several buildings on 9.6 acres, was an entry point for African uranium ores known as pitchblende. These ores, imported for use in the nation's early atomic energy program, were assayed at the Middlesex Sampling Plant and then shipped to other sites for

  19. Monticello Mill Tailings Site Operable Unit Ill Interim Remedial Action

    Office of Legacy Management (LM)

    Site Operable Unit Ill Interim Remedial Action Mark Perfxmed Under DOE Contrici No. DE-AC13-96CJ873.35 for th3 U.S. De[:ar!menf of Energy app~oveJioi'ptiL#ic re1ease;dCinWlionis Unlimilra' This page intentionally left blank Monticello Mill Tailings Site Operable Unit I11 Interim Remedial Action Annual Status Report August 1999 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number MSG-035-0011-00-000 Document Number Q0017700 Work Performed Under

  20. Northeast Site Area A NAPL Remediation Final Report.doc

    Office of Legacy Management (LM)

    82-TAC U.S. Department of Energy Work Performed Under DOE Contract No. for the U.S. Department of Energy DE-AC13-02GJ79491 Approved for public release; distribution is unlimited. Pinellas Environmental Restoration Project Northeast Site Area A NAPL Remediation Final Report September 2003 N0065200 GJO- 2003- 482- TAC GJO- PIN 13.12.10 Pinellas Environmental Restoration Project Northeast Site Area A NAPL Remediation Final Report Young - Rainey STAR Center September 2003 Prepared by U.S. Department

  1. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    FORMER ALLIED CHEMICAL CORPORATION, CHEMICALS COMPANY (NOW GENERAL CHEMICAL CORPORATION) NORTH CLAYMONT, DELAWARE Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioni.ng Projects " .___ . ..-. --.- ------ ". CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 1 1 2 2 2 4 ii INTRODUCTION The Department of Energy (DOE),

  2. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    - ELIMINATION REPORT FOR USS AGRI-CHEMICALS (THE FORMER ARMOUR FERTILIZER ' WORKS) BARTOW, FLORIDA NOv 26 1985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects -.. ." __.-__.._ ..- --- CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES ii Page 4 _ 5 _-_".-. .-.. ELIMINATION REPORT USS AGRI-CHEMICALS (THE FORMER

  3. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    BETHLEHEM STEEL CORPORATION LACKAWANNA, NEW YORK Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects P bl@ C.' , 1 & cr INTRODUCTION BACKGROUND CONTENTS Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 5 iii ELIMINATION REPORT BETHLEHEM STEEL CORPORATION LACKAWANNA, NEW YORK INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy,

  4. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    COLUMBIA UNIVERSITY NEW YORK, NEW YORK Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects INTRODUCTION BACKGROUND CONTENTS Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 2 2 2 3 3 4 iii ELIMINATION REPORT COLUMBIA UNIVERSITY NEW YORK, NEW YORK INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Terminal Waste Disposal

  5. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    DOW CHEMICAL COMPANY WALNUT CREEK, CALIFORNIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects . CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 4 iii _ .._ __.- -.-- ELIMINATION REPORT DOW CHEMICAL COMPANY WALNUT CREEK, CALIFORNIA INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of

  6. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    . CONTENTS INTROOUCTION BACKGROUND Site Function Site Description Radiological History,and Status ELIMINATION ANALYSIS REFERENCES 9 1 1 2 2 2 4 ii ELIMINATION REPORT THE FORMER VIRGINIA-CAROLINA CHEMICAL CORPORATION RICHMOND. VIRGINIA INTROLJUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of ,Remedial Action and Waste Technology, Division of Facility and Site Deconunissioning Projects (and/or predecessor agencies, offices and divisions, has reviewed the past activities of

  7. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES ii Pa e -5 1 : 2 2 4 ELIMINATION REPORT THE FORMER VIRGINIA-CAROLINA CHEMICAL CORPORATION RICHMOND, VIRGINIA INTROUUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices and divisions, has reviewed the past activities of

  8. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    ROHM & HAAS COMPANY PHILADELPHIA, PENNSYLYANIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects CONTENTS Page INTRODUCTIOk BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES 2 2 2 2 3 3 iii ELIMINATION REPORT ROHM & HAAS COMPANY PHILADELPHIA, PENNSYLVANXA INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of

  9. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    SENECA ARMY DEPOT ROMULUS, NEW YORK Department of Energy Office of Nuclear Energy Office of Remedial Action and kaste Technology. Division of Facility and Site Decommissioning Projects INTRODUCTION t3ACKGROUND CONTENTS . -Page Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES 1 4 ii .___ -_-_..--. ._.".. ELIMINATION REPORT SENECA ARMY DEPOT ROMULUS, NEW YORK . INTRODUCTION The Department pf Energy (DOE), Office of Nuclear Energy, Office of

  10. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    SYLVANIA-CORNING NUCLEAR CORPORATION BAYSIDE, NEW YORK VW. Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects ..- .-- ---- CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES ii Page 1 L 2 2 3 3 5 5 - --__( -_..... _ .._ ELIMINATION REPORT THE FORMER SYLVANIA-CORNING NUCLEAR CORPORATION BAYSIDE, NEW YORK L -rc c INTRODUCTION

  11. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    AMOCO CHEMICAL COMPANY (THE FORMER TEXAS CITY CHEMICALS, INC.) TEXAS CITY, TEXAS Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS Summary of Findings REFERENCES ii --.. ---_ .l.- _-__II__-_. -. Page 1 7 7 ' c . ELIMINATION REPORT AMOCO CHEMICAL COMPANY (THE FORMER TEXAS CITY

  12. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    UNIVERSITY OF ARIZONA (U.S. BUREAU OF MINES) TUCSON, ARIZONA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects -- --- .- _- --__ CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES ii - ,. -- Page 1 4 4 ..I___ - ~-___- ELIMINATION REPORT UNIVERSITY OF ARIZONA (U.S. BUREAU OF MINES) TUCSON, ARIZONA INTRODUCTION The Department

  13. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    THE FORMER WESTINGHOUSE ELECTRIC CORPORATION _ BUILDING 7 BLOOMFIELD, NEW JERSEY SW 30 1985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects ---- - - _-. CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page . 1 2 2 2 3 4 4 iii _ -... __. --. ..-__ 1. . -1 ELIMINATION REPORT THE FORMER WESTINGHOUSE ELECTRIC CORPORATION

  14. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT,

    Office of Legacy Management (LM)

    REPORT, FOR AL-TECH SPECIALTY STEEL CORPORATION (THE FORMER ALLEGHENY-LUDLUM STEEL CORPORATION) WATERVLIET, NEW YORK, AND DUNKIRK, NEW YORK Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste.Technology Division of Facility and Site Decommissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES * 1 2 2 2 3 4 4 . . . 111 ELIMINATION REPORT AL-TECH SPECIALTY STEEL CORPORATION

  15. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIkNATION REPORT

    Office of Legacy Management (LM)

    ELIkNATION REPORT .FOR WESTINGHOUSE .ATOMIC POWER DEVELOPMENT PLANT EAST PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Deconrmissioning Projects l CONTENTS INTRODUCTICIN BACKGROUND. Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 2 2 2' 4 4 iii ELIMINATION~REPORT WESTINGHOUSE ATOMIC POWER,DEVELOPMENT,PLANT: EAST

  16. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM

    Office of Legacy Management (LM)

    " __.,__ " - ELIMINATION REPORT TIPPINS, INCORPORATED FORMERLY THE HEPPENSTALL COMPANY 4620 HATFIELD STREET PITTSBURGH, PENNSYLVANIA December 1991 U.S. Department of Energy Office of Environmental Restoration and Waste Madagement Office of Environmental Restoration Office of Eastern Area Programs CONTENTS INTRODUCTION . . . .,,,, ~l.. ,..,,. .<., .,, . . . . . . . . . . . . . . , . . .l BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . .l Site Function Site Description

  17. Nuclear facility decommissioning and site remedial actions: a selected bibliography

    SciTech Connect (OSTI)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

    1982-09-01

    This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.

  18. Expedited site characterization for remedial investigations at federal facilities

    SciTech Connect (OSTI)

    Burton, J.C.

    1994-04-01

    Argonne National Laboratory`s Expedited Side Characterization (ESC) methodology gives federal agencies a process for producing high-quality CERCLA and RCRA site characterizations and remedial investigations in a cost- and time-efficient manner. The ESC process has been successfully tested and applied at numerous federal facilities. Examples include expanded site investigations for the Department of Interior`s Bureau of Land Management and remedial investigations for the Commodity Credit Corporation/US Dept. of Agriculture (CCC/USDA). In particular, the CCC/USDA has been the major sponsor in the development of the ESC process at Argonne. The technical successes and the cost and time savings of the ESC process for these programs have been detailed in previous papers. The Argonne ESC is currently being implemented at a Department of Energy facility (Pantex) and is schedules for implementation in the Department of Defense base closure program in order to meet accelerated schedules for remedial actions by these agencies.

  19. Remediation of DOE hazardous waste sites: Planning and integration requirements

    SciTech Connect (OSTI)

    Geffen, C.A.; Garrett, B.A.; Cowan, C.E.; Siegel, M.R.; Keller, J.F. )

    1989-09-01

    The US Department of Energy (DOE) is faced with a immense challenge in effectively implementing a program to mitigate and manage the environmental impacts created by current operations and from past activities at its facilities. The current regulatory framework and public interest in the environmental arena have made operating DOE facilities in an environmentally responsible manner a compelling priority. This paper provides information on the results of a project funded by DOE to obtain a better understanding of the regulatory and institutional drivers in the hazardous waste market and the costs and timeframes required for remediation activities. Few realize that before remediating a hazardous waste site, a comprehensive planning process must be conducted to characterize the nature and extent of site contamination, calculate the risk to the public, and assess the effectiveness of various remediation technologies. The US Environmental Protection Agency (EPA) and others have found that it may take up to 7 years to complete the planning process at an average cost of $1.0 million per site. While cost information is not yet available for DOE sites, discussions with hazardous waste consulting firms indicate that average characterization and assessment costs will be 5 to 10 times this amount for DOE sites. The higher costs are expected because of the additional administrative requirements placed on DOE sites, the need to handle mixed wastes, the amount and extent of contamination at many of these sites, and the visibility of the sites. 15 refs., 1 fig., 2 tabs.

  20. SUWECT:' .El,imination of Sites from the Formerly Utilized Sites RemediaTAction

    Office of Legacy Management (LM)

    SUWECT:' .El,imination of Sites from the Formerly Utilized Sites RemediaTAction * .,, * < ,. -. Program " -:. " : ,. .: . . ., ", ~0: The File ',. ,.'. .., ,, I' ; ,. : 2 ., %" The'facili.ties'listed belbw have been evaluated'tb determine if remedial .,.action underthe,Formerl,y Utili,zed 'Sites%Remedial,Action :Program (FUSRAP) ',' is warranted. The evaluations consisted of record searches, interviews, site visits, and radiological surveys;,' Based onthis information,

  1. DOE - Office of Legacy Management -- Kennecott Sweetwater Site - 041

    Office of Legacy Management (LM)

    Kennecott Sweetwater Site - 041 FUSRAP Considered Sites Site: Kennecott Sweetwater Site (041) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Kennecott Sweetwater site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Sweetwater County, Wyoming. UMTRA Title II sites are privately owned and operated sites that were

  2. DOE - Office of Legacy Management -- Plateau Shootaring Canyon Site - 034

    Office of Legacy Management (LM)

    Plateau Shootaring Canyon Site - 034 FUSRAP Considered Sites Site: Plateau Shootaring Canyon Site (034 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Plateau site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Shootaring, Utah. UMTRA Title II sites are privately owned and operated sites that were active when

  3. DOE - Office of Legacy Management -- Sohio Lbar Site - 022

    Office of Legacy Management (LM)

    Sohio Lbar Site - 022 FUSRAP Considered Sites Site: Sohio Lbar Site (022 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in New Mexico. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings Radiation Control

  4. DOE - Office of Legacy Management -- WNI Sherwood Site - 039

    Office of Legacy Management (LM)

    Sherwood Site - 039 FUSRAP Considered Sites Site: WNI Sherwood Site (039) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in the State of Washington. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings

  5. DOE - Office of Legacy Management -- WNI Split Rock Site - 043

    Office of Legacy Management (LM)

    Split Rock Site - 043 FUSRAP Considered Sites Site: WNI Split Rock Site (043) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Western Nuclear, Inc. (WNI) Split Rock site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Jeffrey City, Wyoming. UMTRA Title II sites are privately owned and operated sites that were

  6. DOE - Office of Legacy Management -- ANC Gas Hills Site - 040

    Office of Legacy Management (LM)

    ANC Gas Hills Site - 040 FUSRAP Considered Sites Site: ANC Gas Hills Site (040) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The ANC Gas Hills site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Gas Hills, Wyoming. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill

  7. DOE - Office of Legacy Management -- Chevron Panna Maria Site - 030

    Office of Legacy Management (LM)

    Chevron Panna Maria Site - 030 FUSRAP Considered Sites Site: Chevron Panna Maria Site (030) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Texas. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings

  8. DOE - Office of Legacy Management -- Conoco Conquista Site - 031

    Office of Legacy Management (LM)

    Conoco Conquista Site - 031 FUSRAP Considered Sites Site: Conoco Conquista Site (031) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Texas. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings Radiation

  9. DOE - Office of Legacy Management -- Cotter Canon City Site - 009

    Office of Legacy Management (LM)

    Cotter Canon City Site - 009 FUSRAP Considered Sites Site: Cotter Canon City Site (009) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Cotter site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Canon City, Colorado. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium

  10. DOE - Office of Legacy Management -- Dawn Ford Site - 038

    Office of Legacy Management (LM)

    Dawn Ford Site - 038 FUSRAP Considered Sites Site: Dawn Ford Site (038) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Dawn site is a Uranium Mill Tailings Remedial Action (UMTRA) title II site located in Ford, Washington. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings Radiation

  11. DOE - Office of Legacy Management -- EFB White Mesa Site - 033

    Office of Legacy Management (LM)

    EFB White Mesa Site - 033 FUSRAP Considered Sites Site: EFB White Mesa Site (033 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Utah. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill tailings Radiation

  12. Small Site Closures

    Office of Environmental Management (EM)

    Site Closures This table lists the 85 small sites closed as of 2012 in chronological order of completion. 1 A number of these sites were cleaned up under the Formerly Utilized Remedial Action Program (FUSRAP), for which the U.S. Army Corps of Engineers is responsible for site surveys and remediation. Uranium processing sites were addressed by the Uranium Mill Tailings Radiation Control Act (UMTRCA). UMTRCA Title II sites are sites that were commercially owned and are regulated under an U.S.

  13. DOE - Office of Legacy Management -- Monticello Mill Site - UT 03

    Office of Legacy Management (LM)

    Mill Site - UT 03 FUSRAP Considered Sites Site: Monticello Mill Site (UT.03) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Monticello, Utah, Disposal and Processing Sites Documents Related to Monticello Mill Site Monticello Mill Tailings Site Operable Unit III Interim Remedial Action Progress Report July 1999-July 2000.

  14. DOE - Office of Legacy Management -- Pathfinder Lucky Mc Site - 042

    Office of Legacy Management (LM)

    Pathfinder Lucky Mc Site - 042 FUSRAP Considered Sites Site: Pathfinder Lucky Mc Site (042) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Pathfinder Lucky Mc site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in the Gas Hills Uranium Mining District west of Casper, Wyoming. UMTRA Title II sites are privately

  15. Formerly Utilized Sites Remedial Action Program Formal Elimination Report

    Office of Legacy Management (LM)

    Formerly Utilized Sites Remedial Action Program Formal Elimination Report for The Former American Manufacturing Company of Texas (AMCOT) in Fort Worth, Texas U.S. Department of Energy Office of Environmental Restoration Elimination Report Former AMCOT Facility, Ft. Worth, TX INTRODUCTION The Department of Energy (DOE), Office of Environmental Restoration, had reviewed the past activities of the Manhattan Engineer District (MED) and the Atomic Energy ' Commission (AEC) at the former American

  16. Building C-400 Thermal Treatment 90% Remedial Design Report and Site

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Investigation | Department of Energy Building C-400 Thermal Treatment 90% Remedial Design Report and Site Investigation Building C-400 Thermal Treatment 90% Remedial Design Report and Site Investigation Full Document and Summary Versions are available for download PDF icon Building C-400 Thermal Treatment 90% Remedial Design Report and Site Investigation PDF icon Summary - Building C-400 Thermal Treatment Remedial Design Report and Investigation, Paducah, Kentucky More Documents &

  17. DOE - Office of Legacy Management -- Rio Algom Lisbon Valley Site - 035

    Office of Legacy Management (LM)

    Rio Algom Lisbon Valley Site - 035 FUSRAP Considered Sites Site: Rio Algom Lisbon Valley Site (035 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Utah. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill

  18. DOE - Office of Legacy Management -- South Valley Superfund Site - 021

    Office of Legacy Management (LM)

    South Valley Superfund Site - 021 FUSRAP Considered Sites Site: South Valley Superfund Site (021) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Department of Energy is one of seven Potentially Responsible Parties (PRP) for the remediation of this site. The Department of Energy is one of the PRPS because of the Atomic Energy Commission¿s

  19. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    FLORIDA Department of Energy Office of Nuclear Energy Office of Remedial Action and ... Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and ...

  20. Independent Oversight Review, Hanford Site CH2M Hill Plateau Remediation

    Office of Environmental Management (EM)

    Company - November 2012 | Department of Energy CH2M Hill Plateau Remediation Company - November 2012 Independent Oversight Review, Hanford Site CH2M Hill Plateau Remediation Company - November 2012 November 2012 Review of the Hanford Site CH2M Hill Plateau Remediation Company Implementation Verification Review Processes This report documents the results of an independent review of the implementation verification review (IVR) processes employed by CH2M Hill Plateau Remediation Company at the

  1. Final Report Northeast Site Area B NAPL Remediation Project

    Office of Legacy Management (LM)

    Northeast Site Area B NAPL Remediation Project at the Young - Rainey STAR Center Largo, Pinellas County, Florida April 2007 Office of Legacy Management DOE M/1457 2007 - -L Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management U.S. Department of Energy This page intentionally left blank

  2. Microsoft Word - Remedial Action Program Update.rtf

    Office of Legacy Management (LM)

    Action Program Update U.S. Army Corps of Engineers Vol. 2, No. 1 April 2004 Page 2 Introduction This is the second edition of The Formerly Utilized Sites Remedial Action Program Update. It is published as a way of sharing information about the program and the progress the U.S. Army Corps of Engineers (Corps) is making in cleaning up these sites. The goals of the Formerly Utilized Sites Remedial Action Program (FUSRAP) are focused on being fully protective of human health, public safety and the

  3. Unique Construction and Social Experiences in Residential Remediation Sites - 13423

    SciTech Connect (OSTI)

    Jung, Paul; Scarborough, Rebecca

    2013-07-01

    Sevenson Environmental Services, Inc., (Sevenson) has performed several radiological remediation projects located in residential urban areas. Over the course of these projects, there has been a wide variety of experiences encountered from construction related issues to unique social situations. Some of the construction related issues included the remediation of interior basements where contaminated material was located under the footers of the structure or was used in the mortar between cinder block or field stone foundations. Other issues included site security, maintaining furnaces or other utilities, underpinning, backfilling and restoration. In addition to the radiological hazards associated with this work there were occupational safety and industrial hygiene issues that had to be addressed to ensure the safety and health of neighboring properties and residents. The unique social situations at these job sites have included arson, theft/stolen property, assault/battery, prostitution, execution of arrest warrants for residents, discovery of drugs and paraphernalia, blood borne pathogens, and unexploded ordnance. Some of these situations have become a sort of comical urban legend throughout the organization. One situation had historical significance, involving the demolition of a house to save a tree older than the Declaration of Independence. All of these projects typically involve the excavation of early 20. century items such as advertisement signs, various old bottles (milk, Listerine, perfume, whisky) and other miscellaneous common trash items. (authors)

  4. Uptake by plants of radionuclides from FUSRAP waste materials

    SciTech Connect (OSTI)

    Knight, M.J.

    1983-04-01

    Radionuclides from FUSRAP wastes potentially may be taken up by plants during remedial action activities and permanent near-surface burial of contaminated materials. In order to better understand the propensity of radionuclides to accumulate in plant tissue, soil and plant factors influencing the uptake and accumulation of radionuclides by plants are reviewed. In addition, data describing the uptake of the principal radionuclides present in FUSRAP wastes (uranium-238, thorium-230, radium-226, lead-210, and polonium-210) are summarized. All five radionuclides can accumulate in plant root tissue to some extent, and there is potential for the translocation and accumulation of these radionuclides in plant shoot tissue. Of these five radionuclides, radium-226 appears to have the greatest potential for translocation and accumulation in plant shoot tissue. 28 references, 1 figure, 3 tables.

  5. Environmental Response to Remedial Actions at the Weldon Spring Site--An Environmental Success Story

    SciTech Connect (OSTI)

    Meier, J. A.; Welton, T. D.

    2002-02-27

    Environmental remediation activities have been ongoing at the Weldon Spring Site for over a decade, beginning with small interim response actions and culminating in completion of surface cleanup as represented by closure of the 17 hectare (42-acre) on-site disposal cell. As remedial actions have incrementally been accomplished, the occurrence of site-related contaminants in on and off-site environmental media have effectively been reduced. The DOE-WSSRAP has demonstrated success through the effective reduction or elimination of site related water and airborne contaminants along multiple migration pathways. This paper briefly describes the remedial measures affected at Weldon Spring, and quantifies the environmental responses to those remedial measures.

  6. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  7. The U.S. Department of Energy Formerly Utilized Sites Remedial Action

    Energy Savers [EERE]

    Program: Ensuring Protectiveness and Preserving Knowledge | Department of Energy The U.S. Department of Energy Formerly Utilized Sites Remedial Action Program: Ensuring Protectiveness and Preserving Knowledge The U.S. Department of Energy Formerly Utilized Sites Remedial Action Program: Ensuring Protectiveness and Preserving Knowledge The U.S. Department of Energy Formerly Utilized Sites Remedial Action Program: Ensuring Protectiveness and Preserving Knowledge (Waste Management Conference

  8. Voluntary Protection Program Onsite Review, CHPlateau Remediation Contract Hanford Site- March 2011

    Broader source: Energy.gov [DOE]

    Evaluation to determine whether Plateau Remediation Contract Hanford Site is continuing to perform at a level deserving DOE-VPP Star recognition.

  9. Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial

    Energy Savers [EERE]

    Action Program | Department of Energy Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program (March 2012) PDF icon Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program More Documents & Publications Overview of the U.S. Department of Energy

  10. CH2M HILL Plateau Remediation Company - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contracting CH2M HILL Plateau Remediation Company Contracting ORP Contracts and Procurements RL Contracts and Procurements CH2M HILL Plateau Remediation Company Mission Support Alliance Washington Closure Hanford HPM Corporation (HPMC) Wastren Advantage, Inc. Bechtel National, Inc. Washington River Protection Solutions CH2M HILL Plateau Remediation Company Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size CH2M CH2M HILL Plateau Remediation Company is the prime

  11. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    WINCHESTER ENGINEERING AND ANALYTICAL CENTER (NORTHEASTERN RADIOLOGICAL HEALTH LABORATORY) WINCHESTER, MASSACHUSE'ITS Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects . . I . I C O N T E N T S IN T R O D U C T IO N B A C K G R O U N D S i te F u n c ti o n S i te D e s c ri p ti o n R a d i o l o g i c a l H i s to ry a n d S ta tu s E L IM IN A T IO N A N A L Y S IS R E F E R E N C E S - P a g e 1

  12. Remedial action selection report Maybell, Colorado, site. Final report

    SciTech Connect (OSTI)

    1996-12-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The site is 2.5 mi (4 km) northeast of the Yampa River on relatively flat terrain broken by low, flat-topped mesas. U.S. Highway 40 runs east-west 2 mi (3.2 km) south of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. The site is situated between Johnson Wash to the east and Rob Pit Mine to the west. Numerous reclaimed and unreclaimed mines are in the immediate vicinity. Aerial photographs (included at the end of this executive summary) show evidence of mining activity around the Maybell site. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [ml]) and contains 2.8 million cubic yards (yd{sup 3}) (2.1 million cubic meters [m{sup 3}]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd 3 (15,000 m{sup 3}) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd{sup 3}(420,000 m{sup 3}). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd{sup 3} (2.58 million m{sup 3}).

  13. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    Department of Energy Office of Nuclear Energy Office of Remedial Action and ... Department of Energy (DOE), Office of Nuclear Energy, Office of Terminal Waste Disposal ...

  14. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    SYLVANIA-CORNING NUCLEAR CORPORATION BAYSIDE, NEW YORK VW. Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and ...

  15. RCRA Facility Investigation/Remedial Investigation Report for the Grace Road Site (631-22G)

    SciTech Connect (OSTI)

    Palmer, E.

    1998-10-02

    This report summarizes the activities and documents the results of a Resource Conservation and Recovery Act Facility Investigation/Remedial Investigation conducted at Grace Road Site on the Savannah River Site near Aiken, South Carolina.

  16. EA-1219: Hoe Creek Underground Coal Gasification Test Site Remediation, Campbell County, Wyoming

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposed Hoe Creek Underground Coal Gasification Test Site Remediation that would be performed at the Hoe Creek site in Campbell County, Wyoming.

  17. DOE/EV-0005/16 Formerly Utilized MED/AEC Sites Remedial Action Program

    Office of Legacy Management (LM)

    6 Formerly Utilized MED/AEC Sites Remedial Action Program Radic&@cal Survey of the St. Louis Airport Storage Site, St. Louis, Missouri September 1979 Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology .__ -. __ ..- -- DOE/EV-0005/16 UC-70 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the St. Louis Airport Storage Site, St. Louis, Missouri September 1979 Final Report Prepared for

  18. DOE/EV-0005/19 Formerly Utilized MED/AEC Sites Remedial Action Program

    Office of Legacy Management (LM)

    9 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Building Site 421, United States Watertown Arsenel, Watertown, MA February 1980 . Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology ~--.. _..-- DOE/EV-0005/19 UC-70 Formerly Utilized MED/AEC Sites Remedial Action Program Radiologidal Survey of the Building Site 421, United States Watertown Arsenel, Watertown, MA February 1980

  19. Post-Remediation Biomonitoring of Pesticides in Marine Waters Near the United Heckathorn Site, Richmond, California

    SciTech Connect (OSTI)

    Antrim, Liam D.; Kohn, Nancy P.

    2000-09-05

    Marine sediment remediation at the United Heckathorn Superfund Site was completed in April 1997. Water and mussel tissues were sampled in January 1998 from four stations near Lauritzen Canal in Richmond, California, for the first post-remediation monitoring of marine areas near the United Heckathorn Site. Dieldrin and DDT were analyzed in water samples, tissue samples from resident mussels, and tissue samples from transplanted mussels deployed for 4 months. Concentrations of dieldrin and total DDT in water and total DDT in tissue were compared to pre-remediation data available from the California State Mussel Watch program (tissues) and the Ecological Risk Assessment for the United Heckathorn Superfund Site (tissues and water). Biomonitoring results indicated that pesticides were still bioavailable in the water column, and have not been reduced from pre-remediation levels. Annual biomonitoring will continue to assess the effectiveness of remedial actions at the United Heckathorn Site.

  20. Building C-400 Thermal Treatment 90% Remedial Design Report and Site Investigation

    Office of Environmental Management (EM)

    427 Rev. 1 U.S. Department of Energy Office of Environmental Management Paducah Gaseous Diffusion Plant (PGDP) Review Report: Building C-400 Thermal Treatment 90% Remedial Design Report and Site Investigation, PGDP, Paducah Kentucky 15 August 2007 Paducah Gaseous Diffusion Plant (PGDP) Paducah KY Paducah Gaseous Diffusion Plant (PGDP) Paducah KY Prepared for: Office of Groundwater and Soil Remediation Office of Engineering and Technology Review Report - C-400 Thermal Remediation PGDP

  1. The Use of Ecological Restoration Principles To Achieve Remedy Protection at the Fernald Preserve and Weldon Spring Sites

    Broader source: Energy.gov [DOE]

    The Use of Ecological Restoration Principles To Achieve Remedy Protection at the Fernald Preserve and Weldon Spring Sites

  2. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    SciTech Connect (OSTI)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  3. Environmental assessment of remedial action at the Naturita Uranium Processing Site near Naturita, Colorado. Revision 4

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contain measures to control the contaminated materials and to protect groundwater quality. Remedial action at the Naturita site must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of Colorado. The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to either the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast, or a licensed non-DOE disposal facility capable of handling RRM. At either disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed Dry Flats disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. This report discusses environmental impacts associated with the proposed remedial action.

  4. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado. Revision 3

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [10 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

  5. Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography

    SciTech Connect (OSTI)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1985-09-01

    This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description.

  6. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    Facility and Site Decommissioning Projects -- --- .- - -- CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS ...

  7. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    of Facility and Site Decommissioning Projects INTRODUCTION BACKGROUND CONTENTS Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES ...

  8. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 2

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal sits, 6 road miles (mi) [10 kilometers (km)) to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal sits would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The proposed remedial action would result in the loss of approximately 162 ac (66 ha) of soils at the processing and disposal sites; however, 133 ac (55 ha) of these soils at and adjacent to the processing site are contaminated and cannot be used for other purposes. If supplemental standards are approved by the NRC and state of Colorado, approximately 112 ac (45 ha) of contaminated soils adjacent to the processing site would not be cleaned up. This area is steeply sloped. The cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers. Another 220 ac (89 ha) of soils would be temporarily disturbed during the remedial action. The final disposal site would result in approximately 57 ac (23 ha) being removed from livestock grazing and wildlife use.

  9. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes

    SciTech Connect (OSTI)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

  10. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 1

    SciTech Connect (OSTI)

    1996-10-01

    This remedial investigation (RI)/feasibility study (FS) supports the selection of remedial actions for the David Witherspoon, Inc. 901 Maryville Pike Site in Knoxville, Tennessee. Operations at the site, used as a recycling center, have resulted in past, present, and potential future releases of hazardous substances in to the environment. This Site is a Tennessee Superfund site. A phased approach was planned to (1) gather existing data from previous investigations managed by the Tenn. Dept. of Environment and Conservation; (2) perform a preliminary RI, including risk assessments, and an FS with existing data to identify areas where remedial action may be necessary; (3) gather additional field data to adequately define the nature and extent of risk-based contaminants that present identifiable threats to human and/or ecological receptors; and (4) develop remedial action alternatives to reduce risks to acceptable levels.

  11. Climate Change Adaptation Technical Fact Sheet: Landfills and Containment as an Element of Site Remediation

    Broader source: Energy.gov [DOE]

    This fact sheet addresses contaminated site remedies involving source containment systems. It is intended to serve as an adaptation planning tool by (1) providing an overview of potential climate...

  12. Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Action Program | Department of Energy Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program Paper presented at the Waste Management 2012 Conference. February 26 through March 1, 2012, Phoenix, Arizona. Christopher Clayton, Vijendra Kothari, and Ken Starr, U.S. Department of Energy Office of Legacy Management Joey Gillespie and Michael Widdop, S.M. Stoller Corporation,

  13. DOE/EV-0005/10 Formerly Utilized MED/AEC Sites Remedial Action Program

    Office of Legacy Management (LM)

    0 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Former Horizons Inc., Metal Handling Facility, Cleveland, Ohio February 1979 - Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology DOE/EV-0005/10 UC-70 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Former Horizons Inc., Metal Handling Facility, Cleveland, Ohii February 1979 Final Report Prepared

  14. Recovery Act Workers Remediate and Restore Former Waste Sites, Help Reduce

    Office of Environmental Management (EM)

    Cold War Footprint | Department of Energy Remediate and Restore Former Waste Sites, Help Reduce Cold War Footprint Recovery Act Workers Remediate and Restore Former Waste Sites, Help Reduce Cold War Footprint The Hanford Site is looking greener these days after American Recovery and Reinvestment Act workers revegetated 166 acres across 12 waste sites, planting over 1,100 pounds of seeds and about 280,000 pounds of mulch. The largest of the sites, known as the BC Control Area, is an

  15. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5

    SciTech Connect (OSTI)

    Owen, P.T.; Knox, N.P.; Chilton, B.D.; Baldauf, M.F.

    1984-09-01

    This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.

  16. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Vol. 18. Part 2. Indexes

    SciTech Connect (OSTI)

    1997-09-01

    This bibliography contains 3638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D&D), uranium mill tailings management, and site remedial actions. This report is the eighteenth in a series of bibliographies prepared annually for the U.S. Department of Energy (DOE) Office of Environmental Restoration. Citations to foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - have been included in Part 1 of the report. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D&D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Programs; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluations; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues. Within the 16 sections, the citations are sorted by geographic location. If a geographic location is not specified, the citations are sorted according to the document title. In Part 2 of the report, indexes are provided for author, author affiliation, selected title phrase, selected title word, publication description, geographic location, and keyword.

  17. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado. Remedial action selection report, Attachment 2, Geology report: Preliminary final

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this document and the rest of the RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the State of Colorado.

  18. Innovative technology for expedited site remediation of extensive surface and subsurface contamination

    SciTech Connect (OSTI)

    Audibert, J.M.E.; Lew, L.R.

    1994-12-31

    Large scale surface and subsurface contamination resulted from numerous releases of feed stock, process streams, waste streams, and final product at a major chemical plant. Soil and groundwater was contaminated by numerous compounds including lead, tetraethyl lead, ethylene dibromide, ethylene dichloride, and toluene. The state administrative order dictated that the site be investigated fully, that remedial alternative be evaluated, and that the site be remediated within a year period. Because of the acute toxicity and extreme volatility of tetraethyl lead and other organic compounds present at the site and the short time frame ordered by the regulators, innovative approaches were needed to carry out the remediation while protecting plant workers, remediation workers, and the public.

  19. Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9

    SciTech Connect (OSTI)

    Owen, P.T.; Knox, N.P.; Michelson, D.C.; Turmer, G.S.

    1988-09-01

    The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568.

  20. Hanford site tank waste remediation system programmatic environmental review report

    SciTech Connect (OSTI)

    Haass, C.C.

    1998-09-03

    The US Department of Energy (DOE) committed in the Tank Waste Remediation System (TWRS) Environmental Impact Statement (EIS) Record of Decision (ROD) to perform future National Environmental Policy Act (NEPA) analysis at key points in the Program. Each review will address the potential impacts that new information may have on the environmental impacts presented in the TWRS EIS and support an assessment of whether DOE`s plans for remediating the tank waste are still pursuing the appropriate plan for remediation or whether adjustments to the program are needed. In response to this commitment, DOE prepared a Supplement Analysis (SA) to support the first of these reevaluations. Subsequent to the completion of the SA, the Phase IB negotiations process with private contractors resulted in several changes to the planned approach. These changes along with other new information regarding the TWRS Program have potential implications for Phase 1 and Phase 2 of tank waste retrieval and waste storage and/or disposal that may influence the environmental impacts of the Phased Implementation alternative. This report focuses on identifying those potential environmental impacts that may require NEPA analysis prior to authorization to begin facility construction and operations.

  1. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text

    SciTech Connect (OSTI)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  2. Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8

    SciTech Connect (OSTI)

    Owen, P.T.; Michelson, D.C.; Knox, N.P.

    1987-09-01

    The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program, Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations.

  3. Oak Ridge Operations Formerly Utilized Sites Remedial Action...

    Office of Legacy Management (LM)

    ... MEDAEC site because between 1944 and 1961 it was used as a site for experiments employing conventional high explosives in conjunction with research on nuclear weapons development. ...

  4. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12

    SciTech Connect (OSTI)

    Owen, P. T.; Webb, J. R.; Knox, N. P.; Goins, L. F.; Harrell, R. E.; Mallory, P. K.; Cravens, C. D.

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  5. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

  6. Field Summary Report for Remedial Investigation of Hanford Site Releases to the Columbia River, Hanford Site, Washington

    SciTech Connect (OSTI)

    L.C. Hulstrom

    2010-08-11

    This report summarizes field sampling activities conducted in support of WCHs Remedial Investigation of Hanford Site Releases to the Columbia River. This work was conducted form 2008 through 2010. The work included preliminary mapping and measurement of Hanford Site contaminants in sediment, pore water, and surface water located in areas where groundwater upwelling were found.

  7. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    SciTech Connect (OSTI)

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites.

  8. Environmental assessment of remedial action at the Naturita Uranium processing site near Naturita, Colorado. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    The proposed remedial action for the Naturita processing site is relocation of the contaminated materials and debris to the Dry Flats disposal site, 6 road miles (mi) [ 1 0 kilometers (km)] to the southeast. At the disposal site, the contaminated materials would be stabilized and covered with layers of earth and rock. The proposed disposal site is on land administered by the Bureau of Land Management (BLM) and used primarily for livestock grazing. The final disposal site would cover approximately 57 ac (23 ha), which would be permanently transferred from the BLM to the DOE and restricted from future uses. The remedial action activities would be conducted by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial action would result in the loss of approximately 164 ac (66 ha) of soils, but 132 ac (53 ha) of these soils are contaminated and cannot be used for other purposes. Another 154 ac (62 ha) of soils would be temporarily disturbed. Approximately 57 ac (23 ha) of open range land would be permanently removed from livestock grazing and wildlife use. The removal of the contaminated materials would affect the 1 00-year floodplain of the San Miguel River and would result in the loss of riparian habitat along the river. The southwestern willow flycatcher, a Federal candidate species, may be affected by the remedial action, and the use of water from the San Miguel River ``may affect`` the Colorado squawfish, humpback chub, bonytail chub, and razorback sucker. Traffic levels on State Highways 90 and 141 would be increased during the remedial action, as would the noise levels along these transportation routes. Measures for mitigating the adverse environmental impacts of the proposed remedial action are discussed in Section 6.0 of this environmental assessment (EA).

  9. Recovery Act Workers Remediate and Restore Former Waste Sites...

    Office of Environmental Management (EM)

    technologies. A video of the revegetation is available at the DOE-Richland Operations YouTube site at www.youtube.comHanfordSite. Left Photo: Recovery Act workers with CH2M HILL...

  10. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    WOLVERINE TUBE DIVISION 1411 CENTRAL AVENUE DETROIT, MICHIGAN JUNE 1990 U.S. Department of Energy Office of Environmental Restoration CONTENTS Paqe INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . BACKGROUND............................ Site Function ......................... Site Description. ....................... Radiological History and Status ................ Beryllium History and Status. ................. ELIMINATION KbJLYSIS . . , . . . . . . . . . . . . . . . . . . . .

  11. Supplement No. 2 to the FUSRAP Summary Protocol - Verification and

    Energy Savers [EERE]

    Certification Protocol | Department of Energy 2 to the FUSRAP Summary Protocol - Verification and Certification Protocol Supplement No. 2 to the FUSRAP Summary Protocol - Verification and Certification Protocol Supplement No. 2 to the FUSRAP Summary Protocol - Verification and Certification Protocol (November 1985, Rev. 1) PDF icon Supplement No. 2 to the FUSRAP Summary Protocol - Verification and Certification Protocol (November 1985, Rev. 1) More Documents & Publications Supplement No.

  12. Weldon Spring Site environmental report for calendar year 1993. Weldon Springs Site Remedial Action Project

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    This Site Environmental Report for Calendar Year 1993 describes the environmental monitoring programs at the Weldon Spring Site Remedial Action Project (WSSRAP). The objectives of these programs are to assess actual or potential exposure to contaminant effluents from the project area by providing public use scenarios and dose estimates, to demonstrate compliance with Federal and State permitted levels, and to summarize trends and/or changes in contaminant concentrations from environmental monitoring program. In 1993, the maximum committed dose to a hypothetical individual at the chemical plant site perimeter was 0.03 mrem (0.0003 mSv). The maximum committed dose to a hypothetical individual at the boundary of the Weldon Spring Quarry was 1.9 mrem (0.019 mSv). These scenarios assume an individual walking along the perimeter of the site-once a day at the chemical plant/raffinate pits and twice a day at the quarry-250 days per year. This hypothetical individual also consumes fish, sediment, and water from lakes and other bodies of water in the area. The collective dose, based on an effected population of 112,000 was 0.12 person-rem (0.0012 person-Sv). This calculation is based on recreational use of the August A. Busch Memorial Conservation Area and the Missouri Department of Conservation recreational trail (the Katy Trail) near the quarry. These estimates are below the U.S. Department of Energy requirement of 100 mrem (I mSv) annual committed effective dose equivalent for all exposure pathways. Results from air monitoring for the National Emission Standards for Hazardous Air Pollutants (NESHAPs) program indicated that the estimated dose was 0.38 mrem, which is below the U.S. Environmental Protection Agency (EPA) standard of 10 mrem per year.

  13. Screening of Potential Remediation Methods for the 200-BP-5 Operable Unit at the Hanford Site

    SciTech Connect (OSTI)

    Truex, Michael J.; Dresel, P. EVAN; Nimmons, Michael J.; Johnson, Christian D.

    2006-09-21

    A screening-level evaluation of potential remediation methods for application to the contaminants of concern (COC) in the 200-BP-5 Operable Unit at the Hanford Site was conducted based on the methods outlined in the Guidance for Conducting Remedial Investigations and Feasibility Studies under CERCLA Interim Final (EPA 1988). The scope of this screening was to identify the most promising remediation methods for use in the more detailed analysis of remediation alternatives that will be conducted as part of the full feasibility study. The screening evaluation was conducted for the primary COC (potential major risk drivers) identified in the groundwater sampling and analysis plan for the operable unit (DOE/RL-2001-49, Rev. 1) with additions.

  14. Biological assessment of remedial action at the abandoned uranium mill tailings site near Naturita, Colorado

    SciTech Connect (OSTI)

    1996-03-01

    Pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, the U.S. Department of Energy (DOE) is proposing to conduct remedial action to clean up the residual radioactive materials (RRM) at the Naturita uranium processing site in Colorado. The Naturita site is in Montrose County, Colorado, and is approximately 2 miles (mi) (3 kilometer [km]) from the unincorporated town of Naturita. The proposed remedial action is to remove the RRM from the Naturita site to the Upper Burbank Quarry at the Uravan disposal site. To address the potential impacts of the remedial action on threatened and endangered species, the DOE prepared this biological assessment. Informal consultations with the U.S. Department of the Interior, Fish and Wildlife Service (FWS) were initiated in 1986, and the FWS provided a list of the threatened and endangered species that may occur in the Naturita study area. This list was updated by two FWS letters in 1988 and by verbal communication in 1990. A biological assessment was included in the environmental assessment (EA) of the proposed remedial action that was prepared in 1990. This EA addressed the impacts of moving the Naturita RRM to the Dry Flats disposal site. In 1993, the design for the Dry Flats disposal alternative was changed. The FWS was again consulted in 1993 and provided a new list of threatened and endangered species that may occur in the Naturita study area. The Naturita EA and the biological assessment were revised in response to these changes. In 1994, remedial action was delayed because an alternate disposal site was being considered. The DOE decided to move the FIRM at the Naturita site to the Upper Burbank Quarry at the Uravan site. Due to this delay, the FWS was consulted in 1995 and a list of threatened and endangered species was provided. This biological assessment is a revision of the assessment attached to the Naturita EA and addresses moving the Naturita RRM to the Upper Burbank Quarry disposal site.

  15. Formerly Utilized Sites Remedial Action Program Fact Sheet

    Broader source: Energy.gov (indexed) [DOE]

    Ammunition Plant Seaway Industrial Park Linde Air Products Tonawanda Landfill Niagara Falls Storage Site Guterl Specialty Steel Colonie Shallow Land Disposal Area Shpack...

  16. Monticello Mill Tailings Site Operable Unit I11 Remedial Investigation Addendum1

    Office of Legacy Management (LM)

    Monticello Mill Tailings Site Operable Unit I11 Remedial Investigation Addendum1 Focused Feasibility Study January 2004 Prepared by U.S. Department of Energy Grand Junction, Colorado Work performed under DOE Contract No. DE-AC1342GJ79491 DOE Task Order No. ST03-205 Document N u m b e r Q0029500 S i g t ~ a t u r e Page Signature Page Monticello Mill Tailings Site Operable Unit I11 Remedial Investigation Addendud Focused Feasibility Study January 2004 Submitted By: Arthur W. Kleinrath, Project

  17. DOE/EV-0005/11 Formerly Utilized M.ED/AEC Sites Remedial Action Program

    Office of Legacy Management (LM)

    1 Formerly Utilized M.ED/AEC Sites Remedial Action Program Radidogical Survey of the Seneca Army Depot Romulus, New York February 1979 Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology : E 1 bOE/EV-0005/11 UC-70 Formerly Utilized MEDIAEC Sites Remedial Action Program Radidogical Survey of the Seneca Army Depot Romulus, New York February 1979 Final Report Prepared for U.S. Department of Energy Assistant Secretary

  18. Z-LJQ- Formerly Utilized MED/AEC Sites Remedial Action Program

    Office of Legacy Management (LM)

    lOE/EV-0005/9 Z-LJQ- Formerly Utilized MED/AEC Sites Remedial Action Program Radiologicd Survey of the Former GSA 39th Street Warehouse 1716 Pershing Road, Chicago, Illinois January 1979 . Final Report Prepared for: U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology ' !. & .~~"I__ _ -..- ~-. _...-. DO E/EV-0005/g UC-70 Formerly Utilized MED/AEC Sites Remedial Action Program Radiologicd Survey of the Former GSA 39th Street Warehouse

  19. OE/EV-0005/2 Formerly Utilized MED/AEC Sites Remedial Action Program

    Office of Legacy Management (LM)

    OE/EV-0005/2 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Hooker Chemical Company Niagara Falls, New York January 1977 Final Report Prepared for U.S. Department of Energy Division of Environmental Control Technology Washington, D.C. 20545 DOE/EV-0005/2 UC-70 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Hooker Chemical Company Niagara Falls, New York January 1977 Final Report Prepared for U.S. Department of Energy

  20. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINFA;RIOflH;EPORT

    Office of Legacy Management (LM)

    ELIMINFA;RIOflH;EPORT FORMER ELECTRO METALLURGICAL COMPANY NIAGARA FALLS, NEW YORK U.S. DEPARTMENT OF ENERGY OFFICE OF NUCLEAR ENERGY OFFICE OF REMEDIAL ACTION AND WASTE TECHNOLOGY DIVISION OF FACILITY AND SITE DECOMMISSIONING PROJECTS CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS SUMMARY OF FINDINGS REFERENCES Page 1 : 3 5 7 8 ELIMINATION REPORT FORMER ELECTRO METALLURGICAL COMPANY NIAGARA FALLS, NEW YORK INTRODUCTION From

  1. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    C-B TOOL PRODUCTS COMPANY 965 EAST 58TH STREET CHICAGO, ILLINOIS JANUARY 31, 1990 U.S. Department of Energy Office of Environmental Restoration and Waste Management Office of Environmental Restoration Decontamination and Decommissioning Division . CONTENTS Page INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . 1 BACKGROUND........................... 1 Site Function ............................................ Site Description i Radiological History and Status .............. 2

  2. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    FOk FORMER QUALITY HARDWARE AND MACHINE COMPANY; 5823/5849 NORTH RAVENSWOOD AVENUE; CHICAGO, ILLINOIS JULY 1990 U.S. Department of Energy Office of Environmental Restoration -_-~---- _ .l~- "_^-- __._.---. .^- Elimination Report Former >lfality Hardware and Machine Company CONTENTS Page INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 BACKGROUND............................ 1 Site Function ......................... 1 Site Description. .......................

  3. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    WILLIAM PRATT MANUFACTURING COMPANY; 18 HENDERSON STREET: JOLIET, ILLINOIS JULY 1990 U.S. Department of Energy Office of Environmental Restoration "ll-..-l-- I- I.._- _.. Elimination ReDort Former William-E. Pratt Manufacturing Company CONTENTS Paqe INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . BACKGROUND............................ Site Function ......................... Site Description. ....................... Radiological History and Status ................

  4. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM L ELIMINATION REPORT

    Office of Legacy Management (LM)

    L ELIMINATION REPORT 2 FOR FORMER R. KRASBERG AND SONS MANUFACTURING COMPANY; 2501 WEST HOMER STREET; CHICAGO, ILLINOIS JULY 1990 U.S. Department of Energy Office of Environmental Restoration i c Elimination ReDort Former R. Krasberg and Sons Manufacturing Company '1 CONTENTS c INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . BACKGROUND............................ Site Function ......................... Site Description. ....................... Radiological History and Status

  5. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  6. Executive summary: Weldon Spring Site Environmental Report for calendar year 1992. Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    This report has been prepared to provide information about the public safety and environmental protection programs conducted by the Weldon Spring Site Remedial Action Project. The Weldon Spring site is located in southern St. Charles County, Missouri, approximately 48 km (30 mi) west of St. Louis. The site consists of two main areas, the Weldon Spring Chemical Plant and raffinate pits and the Weldon Spring Quarry. The objectives of the Site Environmental Report are to present a summary of data from the environmental monitoring program, to characterize trends and environmental conditions at the site, and to confirm compliance with environmental and health protection standards and requirements. The report also presents the status of remedial activities and the results of monitoring these activities to assess their impacts on the public and environment. The scope of the environmental monitoring program at the Weldon Spring site has changed since it was initiated. Previously, the program focused on investigations of the extent and level of contaminants in the groundwater, surface waters, buildings, and air at the site. In 1992, the level of remedial activities required monitoring for potential impacts of those activities, particularly on surface water runoff and airborne effluents. This report includes monitoring data from routine radiological and nonradiological sampling activities. These data include estimates of dose to the public from the Weldon Spring site; estimates of effluent releases; and trends in groundwater contaminant levels. Also, applicable compliance requirements, quality assurance programs, and special studies conducted in 1992 to support environmental protection programs are reviewed.

  7. Screening of Potential Remediation Methods for the 200-ZP-1 Operable Unit at the Hanford Site

    SciTech Connect (OSTI)

    Truex, Michael J.; Nimmons, Michael J.; Johnson, Christian D.; Dresel, P EVAN.; Murray, Christopher J.

    2006-08-07

    A screening-level evaluation of potential remediation methods for application to the contaminants of concern (COC) in the 200-ZP-1 Operable Unit at the Hanford Site was conducted based on the methods outlined in the Guidance for Conducting Remedial Investigations and Feasibility Studies under CERCLA Interim Final. The scope of this screening was to identify the most promising remediation methods for use in the more detailed analysis of remediation alternatives that will be conducted as part of the full feasibility study. The screening evaluation was conducted for the primary COC (potential major risk drivers). COC with similar properties were grouped for the screening evaluation. The screening evaluation was conducted in two primary steps. The initial screening step evaluated potential remediation methods based on whether they can be effectively applied within the environmental setting of the 200-ZP-1 Operable Unit for the specified contaminants. In the second step, potential remediation methods were screened using scoping calculations to estimate the scale of infrastructure, overall quantities of reagents, and conceptual approach for applying the method for each defined grouping of COC. Based on these estimates, each method was screened with respect to effectiveness, implementability, and relative cost categories of the CERCLA feasibility study screening process defined in EPA guidance.

  8. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites, Slick Rock, Colorado

    SciTech Connect (OSTI)

    1995-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978, hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the processing sites and on vicinity properties (VPs) associated with the sites. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contained measures to control the contaminated materials and to protect the ground water from further degradation. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown and waterborne radioactive tailings materials. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the processing sites on land administered by the US Bureau of Land Management (BLM). Remediation would be performed by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project.

  9. Remedial Action Plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Shiprock, New Mexico

    SciTech Connect (OSTI)

    Hill, T.V.; Morley, J.A. . Uranium Mill Tailings Remedial Action Project Office); Began, E.T. )

    1985-06-01

    This Remedial Action Plan (RAP) has been developed to serve a twofold purpose. It presents the series of activities which are proposed by the Department of Energy (DOE) to effect long-term control of radioactive materials at the inactive uranium processing site located on the Navajo Reservation at Shiprock, New Mexico. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Shiprock site. Detailed supporting information can be found in appendices and referenced documents. Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3.0 traces the history of operations at the Shiprock site with a description of the present site characteristics. Section 4.0 provides a definition of site-specific problems, a listing of remedial action alternatives which have been considered, and the action which is being proposed. Section 5.0 presents a summary of the conceptual design for the proposed action which includes objectives, design features, schedule, cost, and implementation methods. Section 6.0 summarizes the plan for ensuring health and safety protection for the surrounding community and the onsite workers. Section 7.0 presents a detailed listing of the responsibilities of the project participants. Section 8.0 describes the quality assurance process that will be used by the RAC during construction. Section 9.0 describes the features of the long-term maintenance and surveillance plan. Section 10.0 documents the on-going activities to keep the public informed and participating in the project. Attached as part of the RAP are five appendices which describe in more detail various aspects of the remedial action.

  10. Environmental assessment of remedial action at the slick rock Uranium Mill Tailings sites Slick Rock, Colorado

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (42 USC {section} 7901 et seq.), hereafter referred to as the UMTRCA, authorized the U.S. Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the sites and on vicinity properties (VPs) associated with the sites. Contaminated materials cover an estimated 55 acres of the Union Carbide (UC) processing site and 12 ac of the North Continent (NC) processing site. The total estimated volume of contaminated materials is approximately 61 8,300 cubic yards. In addition to the contamination in the two processing site areas, four VPs were found to contain contamination. As a result of the tailings being exposed to the environment, contamination associated with the UC and NC sites has leached into shallow ground water. Surface water has not been affected. The closest residence is approximately 0.3 air mi from either site. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the sites on land administered by the Bureau of Land Management (BLM). Remediation would be performed by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. All solid contaminated materials would be buried under 5 feet (ft) of rock and soil materials. The proposed disposal site area is currently used by ranchers for cattle grazing over a 7-month period. The closest residence to the proposed disposal site is 2 air mi. An estimated 44 ac of land would be permanently transferred from the BLM to the DOE and restricted from future use.

  11. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT

    Office of Legacy Management (LM)

    REVERE COPPER AND BRASS CORPORATION 5851 WEST JEFFERSON STREET DETROIT, MICHIGAN MARCH 30, 1990 U.S. Department of Energy Office of Environmental Restoration and Waste Management Office of Environmental Restoration Decontamination and Decommissioning Division /I I_. ,I - CONTENTS Page INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Site Function

  12. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado: Revision 5

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    Title 1 of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the inactive Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. Title 2 of the UMTRCA authorized the US Nuclear Regulatory Commission (NRC) or agreement state to regulate the operation and eventual reclamation of active uranium processing sites. The uranium mill tailings at the site were removed and reprocessed from 1977 to 1979. The contaminated areas include the former tailings area, the mill yard, the former ore storage area, and adjacent areas that were contaminated by uranium processing activities and wind and water erosion. The Naturita remedial action would result in the loss of 133 acres (ac) of contaminated soils at the processing site. If supplemental standards are approved by the NRC and the state of Colorado, approximately 112 ac of steeply sloped contaminated soils adjacent to the processing site would not be cleaned up. Cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers.

  13. DOE/OR/20722-133 POST-REMEDIAL ACTION REPORT FOR THE NIAGARA FALLS STORAGE SITE

    Office of Legacy Management (LM)

    OR/20722-133 POST-REMEDIAL ACTION REPORT FOR THE NIAGARA FALLS STORAGE SITE VICINITY PROPERTIES - 1985 AND 1986 JANUARY 1989 Prepared for UNITED STATES DEPARTMENT OF ENERGY OAK RIDGE OPERATIONS OFFICE Under Contract No. DE-AC05-810R20722 M. E. Kaye and A. M. Feldman Bechtel National, Inc. Oak Ridge, Tennessee Bechtel J o b No. 14501 TABLE OF CONTENTS Abbreviations 1.0 Introduction 2.0 Remedial Action Guidelines 3.0 Remedial Action 4.0 Post-Remedial Action Sampling 5.0 Post-Remedial Action Status

  14. Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 4

    SciTech Connect (OSTI)

    Owen, P.T.; Knox, N.P.; Fielden, J.M.; Faust, R.A.

    1983-09-01

    This bibliography of 657 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fourth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic documents of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - have been references in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; and (6) Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author, or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. Appendix A lists 264 bibliographic references to literature identified during this reporting period but not abstracted due to time constraints. Title and publication description indexes are given for this appendix. Appendix B defines frequently used acronyms, and Appendix C lists the recipients of this report according to their corporate affiliation.

  15. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report: Attachment 2, Geology report, Final

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd{sup 3}) (2.1 million cubic meters [m{sup 3}]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd{sup 3} (15,000 m{sup 3}) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd{sup 3} (420,000 m{sup 3}). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd{sup 3} (2.58 million m{sup 3}). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations.

  16. DOEIEV-0005/20 Formerly Utilized MED/AEC Sites Remedial Action Program

    Office of Legacy Management (LM)

    20 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Middlesex Municipal Landfill, Middlesex, New Jersey April 1980 , Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Office of Environmental Compliance and Overview Division of Environmental Control Technology DOE/EV-O005/20 UC-70 Formerly Utilized MED/AEC Sites Remedbl Action Program Radiological Survey uf the Middlesex Municipal Landfill, Middlesex, New Jersey April 1980

  17. Biological assessment for the remedial action at the chemical plant area of the Weldon Spring site

    SciTech Connect (OSTI)

    Hlohowskyj, I.; Dunn, C.P.

    1992-11-01

    The Weldon Spring site in St.Charles County, Missouri, became contaminated during the 1940s through the 1960s as a result of explosives production by the US Army and uranium and thorium processing by the predecessor agency of the US Department of Energy (DOE). The site is listed on the National Priorities List of the US Environmental Protection Agency, and DOE is responsible for its cleanup. Contaminants are present in soil, surface water, and aquatic sediments. Alternatives identified for site remediation are no action (included as baseline for comparison), treatment and disposal of the wastes at the Weldon Spring site, and on-site treatment followed by off-site disposal at either a commercial facility near Clive, Utah, or at DOE's Hanford site near Richland, Washington. In accordance with the requirements of the Endangered Species Act, this biological assessment has been prepared to evaluate the potential effects of proposed remedial action alternatives on federal listed (endangered or threatened) and candidate species at the respective sites. The assessment includes consideration of the environmental setting at each site; the federal listed and candidate species that could occur at each site; the construction, excavation, and treatment activities under each alternative; and the amount of land area affected at each site.

  18. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands assessment (Assessment 2) are included as part of this EA. The following sections and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service.

  19. Remedial action plan for stabilization of the inactive uranium mill tailings site at Monument Valley, Arizona

    SciTech Connect (OSTI)

    1986-02-01

    This Remedial Action Plan (RAP) has been developed to serve a two-fold purpose. It presents the series of activities which are proposed by the U.S. Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Monument Valley, Arizona It also serves to document the concurrence of both the Navajo Nation and the U.S. Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by NRC, becomes Appendix B of the Cooperative Agreement.

  20. ANL=OHS/HP=83=102 FORMERLY UTILIZED MEDIAEC SITES REMEDIAL ACTION PROGRAM

    Office of Legacy Management (LM)

    ' DO E/EV=0005/40 ANL=OHS/HP=83=102 FORMERLY UTILIZED MEDIAEC SITES REMEDIAL ACTION PROGRAM RADIOLOGICAL SURVEY OF THE ALBANY METALLURGICAL RESEARCH CENTER UNITED STATES BUREAU OF MINES ALBANY, OREGON Q\OLO G/C G- 4& G <iI a,9 ' i . sr do OCCUPATIONAL HEALTH AND SAFETY DIVISION Health Physics Section ARGONNE NATIONAL LABORATORY, ARGONNE, ILLINOIS Operated by THE UNIVERSITY OF CHICAGO for the U. S. DEPARTMENT OF ENERGY under Contract W=31=109-Eng-38 Distribution Category: Remedial Action

  1. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Appendix D. Final report

    SciTech Connect (OSTI)

    1988-07-01

    This appendix is an assessment of the present conditions of the inactive uranium mill site near Mexican Hat, Utah. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan. Plan is to characterize the conditions at the mill and tailings site so that the Remedial Action Contractor may complete final designs of the remedial action.

  2. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado: Final report. Volume 3, Appendix F, Final design, specifications, and drawings

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    This volume contains Appendix F, bid schedule and specifications for remedial action on three sites: Old Rifle processing site; New Rifle processing site and Estes Gulch disposal site.

  3. Remedial action plan for the inactive Uranium Processing Site at Naturita, Colorado. Remedial action plan: Attachment 2, Geology report, Attachment 3, Ground water hydrology report: Working draft

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section}7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the state of Colorado.

  4. Nuclear facility decommissioning and site remedial actions. Volume 1. A selected bibliography

    SciTech Connect (OSTI)

    Faust, R.A.; Fore, C.S.; Knox, N.P.

    1980-09-01

    This bibliography of 633 references represents the first in a series to be produced by the Remedial Actions Program Information Center (RAPIC) containing scientific, technical, economic, and regulatory information concerning the decommissioning of nuclear facilities. Major chapters selected for this bibliography are Facility Decommissioning, Uranium Mill Tailings Cleanup, Contaminated Site Restoration, and Criteria and Standards. The references within each chapter are arranged alphabetically by leading author, corporate affiliation, or title of the document. When the author is not given, the corporate affiliation appears first. If these two levels of authorship are not given, the title of the document is used as the identifying level. Indexes are provided for (1) author(s), (2) keywords, (3) title, (4) technology development, and (5) publication description. An appendix of 123 entries lists recently acquired references relevant to decommissioning of nuclear facilities. These references are also arranged according to one of the four subject categories and followed by author, title, and publication description indexes. The bibliography was compiled from a specialized data base established and maintained by RAPIC to provide information support for the Department of Energy's Remedial Actions Program, under the cosponsorship of its three major components: Surplus Facilities Management Program, Uranium Mill Tailings Remedial Actions Program, and Formerly Utilized Sites Remedial Actions Program. RAPIC is part of the Ecological Sciences Information Center within the Information Center Complex at Oak Ridge National Laboratory.

  5. DOE - Office of Legacy Management -- St Louis Airport Site Vicinity...

    Office of Legacy Management (LM)

    FUSRAP Considered Sites Site: St. Louis Airport Site Vicinity Properties (017) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition:...

  6. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 2, Appendixes

    SciTech Connect (OSTI)

    1996-10-01

    This document contains the appendixes for the remedial investigation and feasibility study for the David Witherspoon, Inc., 901 site in Knoxville, Tennessee. The following topics are covered in the appendixes: (A) David Witherspoon, Inc., 901 Site Historical Data, (B) Fieldwork Plans for the David Witherspoon, Inc., 901 Site, (C) Risk Assessment, (D) Remediation Technology Discussion, (E) Engineering Support Documentation, (F) Applicable or Relevant and Appropriate Requirements, and (G) Cost Estimate Documentation.

  7. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1A: Citations with abstracts, sections 1 through 9

    SciTech Connect (OSTI)

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized Sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  8. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1B: Citations with abstracts, sections 10 through 16

    SciTech Connect (OSTI)

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions; (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.

  9. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona

    SciTech Connect (OSTI)

    Not Available

    1989-08-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site near Tuba City, Arizona. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the Navajo Nation, the Hopi Tribe, US Bureau of Indian Affairs (BIA), and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE, the Navajo Nation, and the Hopi Tribe, and concurrence by NRC, becomes Appendix B of the Cooperative Agreement. Following the introduction, contents are as follows: Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3.0 summarizes the present site characteristics and provides a definition of site-specific problems. Section 4.0 is the site design for the proposed action. Section 5.0 summarizes the plan for ensuring environmental, health, and safety protection for the surrounding community and the on-site workers. Section 6.0 presents a detailed listing of the responsibilities of the project participants. Section 7.0 describes the features of the long-term surveillance and maintenance plan. Section 8.0 presents the quality assurance aspects of the project. Section 9.0 documents the ongoing activities to keep the public informed and participating in the project.

  10. AN L=OHS/HP=84.108 FORMERLY UTILIZED MEDIAEC SITES REMEDIAL ACTION PROGRAM

    Office of Legacy Management (LM)

    T3 L , & ' *:-1 :7-r-, !J * _ _. ' ' / :.: AN L=OHS/HP=84.108 FORMERLY UTILIZED MEDIAEC SITES REMEDIAL ACTION PROGRAM REPORT OF THE DECONTAMINATION OF JONES CHEMICAL LABORATORY, RYERSON PHYSICAL LABORATORY, AND ECKHART HALL THE UNIVERSITY OF CHICAGO CHICAGO, ILLINOIS OCCUPATIONAL HEALTH AND SAFETY DIVISION Health Physics Section EI ARGONNE NATIONAL LABORATORY, ARGONNE, ILLINOIS 2 & Operated by THE UNIVERSITY OF CHICAGO for the U. S. DEPARTMENT OF ENERGY i under Contract W -31=109=Eng-38

  11. SUBJECT: Documents Pertaining to Sites Being Evaluated in the Formerly Utilized

    Office of Legacy Management (LM)

    kJriited States Governmcht DepartGent of Energy ' -~ ' ---~~~ 1 DATE: JAN 2 4 19% lE$;E EM-421 (IL A. Yilli,ams. 427-1719) SUBJECT: Documents Pertaining to Sites Being Evaluated in the Formerly Utilized Sites Remedial Action Program I To: E. Osheim, OH - The Formerly Utilized Sites Remedial Action Program (FUSRAP) is evaluating the activities of a number of companies which may have been involved with radiological activities for the Manhattan Engineer District (MED) or the Atomic Energy

  12. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Appendix D, Final report

    SciTech Connect (OSTI)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two designated inactive uranium mill tailings sites near Rifle, Colorado, and the proposed disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  13. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes. Environmental Restoration Program

    SciTech Connect (OSTI)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

  14. EIS-0132: Remedial Actions at the Former Union Carbide Corp. Uranium Mill Sites, Rifle, Garfield County, Colorado

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this statement to evaluate and compare the environmental impacts of remediating the residual radioactive materials left at the inactive uranium tailing sites in Rifle, Colorado.

  15. Lessons Learned: Tribal Community Engagement, Remediation and Restoration of a Uranium Mine Tailings Site, Navajo Nation - 12484

    SciTech Connect (OSTI)

    Wadsworth, Donald K.; Hicks, Allison H.

    2012-07-01

    In May, 2011 New World Environmental Inc. was awarded a contract by the Navajo Nation Environmental Protection Agency to remediate an illegal radioactive waste disposal site located in the Navajo Nation. The initial scope included the excavation and shipment of an estimated 3,000 cubic yards of Uranium mine tailings and associated industrial waste. In this instance Stakeholders were supportive of the project, remediation and restoration, yet the movement of residual radioactive materials through tribal communities was a controversial issue. Other Stakeholder issues included site security, water sources for remediation activities, local residents' temporary re-location and care of livestock, right of way permissions and local workforce development. This presentation recaps the technical and non-technical issues encountered in the remediation and restoration the seven acre site and the outreach to surrounding communities. Cultural and equity issues resulting from historical problems associated with this and other sites in the immediate area and education and training. (authors)

  16. EIS-0126: Remedial Actions at the Former Climax Uranium Company Uranium Mill Site, Grand Junction, Mesa County, Colorado

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this EIS to assess the environmental impacts of remediating the residual radioactive materials left from the inactive uranium processing site and associated properties located in Grand Junction, Colorado.

  17. Final Feasibility Study for the Madison Site , Madison Illinois, January 2000.

    Office of Legacy Management (LM)

    LIST OF ACRONYMS AEA Atomic Energy Act AEC Atomic Energy Commission ALARA as low as reasonably achievable ARAR Applicable or Relevant and Appropriate Requirements Bq Becquerel CERCLA Comprehensive Environmental Response, Compensation, and Liability Act DCGL W Derived Concentration Guideline Level DOE Department of Energy dpm disintegration per minute EPA U.S. Environmental Protection Agency FS Feasibility Study FUSRAP Formerly Used Sites Remedial Action Program HEAST Health Effects Assessment

  18. Site Management Guide (Blue Book)

    SciTech Connect (OSTI)

    2014-03-01

    The U.S. Department of Energy (Department) Office of Legacy Management (LM), established in 2003, manages the Department’s postclosure responsibilities and ensures the future protection of human health and the environment. During World War II and the Cold War, the Federal government developed and operated a vast network of industrial facilities for the research, production, and testing of nuclear weapons, as well as other scientific and engineering research. These processes left a legacy of radioactive and chemical waste, environmental contamination, and hazardous facilities and materials at well over 100 sites. Since 1989, the Department has taken an aggressive accelerated cleanup approach to reduce risks and cut costs. At most Departmental sites undergoing cleanup, some residual hazards will remain at the time cleanup is completed due to financial and technical impracticality. However, the Department still has an obligation to protect human health and the environment after cleanup is completed. LM fulfills DOE’s postclosure obligation by providing long-term management of postcleanup sites which do not have continuing missions. LM is also responsible for sites under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Currently, the U.S. Army Corps of Engineers (USACE) is responsible for site surveys and remediation at FUSRAP sites. Once remediation is completed, LM becomes responsible for long-term management. LM also has responsibility for uranium processing sites addressed by Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA). UMTRCA Title II sites are sites that were commercially owned and are regulated under a U.S. Nuclear Regulatory Commission (NRC) license. For license termination, the owner must conduct an NRC-approved cleanup of any on-site radioactive waste remaining from former uranium ore-processing operations. The site owner must also provide full funding for inspections and, if necessary, ongoing maintenance. Once site cleanup is complete, LM accepts title to these sites on behalf of the United States and assumes long-term management.

  19. Remedial action and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Attachment 2, Geology report

    SciTech Connect (OSTI)

    Not Available

    1993-07-01

    This report presents geologic considerations that are pertinent to the Remedial Action Plan for Slick Rock mill tailings. Topics covered include regional geology, site geology, geologic stability, and geologic suitability.

  20. Bioremediation in oil-contaminated sites: Bacteria and surfactant accelerated remediation

    SciTech Connect (OSTI)

    Strong-Gunderson, J.M.; Guzman, F.

    1996-12-31

    In Mexico, there are several environmental issues which are being addressed under the current governmental legislation. One of the important issues is restoring sites belonging to Petroleos Mexicanos (PEMEX). PEMEX is a large government owned oil company that regulates and manages the oil reserves. These sites are primarily contaminated with weathered hydrocarbons which are a consequence of extracting millions of barrels of oil. Within the southern regions of Mexico there are sites which were contaminated by activities and spills that have occurred during the past 30 years. PEMEX has taken the leadership in correcting environmental problems and is very concerned about cleaning up the contaminated sites as quickly as possible. The most significant contaminated sites are located to the north of Veracruz and south of Tabasco. These site areas are close to refineries or locations of oil exploration. The primary category of contaminants are hydrocarbons, among them asphaltenes, aromatic and other contaminants. The concentration of the contaminants varies depending on the location of the sites, but it can reach as high as 500,000 ppm. PEMEX has been searching for appropriate, and cost-effective technologies to clean up these sites. Biologically based remediation activities are of primary interest to PEMEX. However, other treatment technologies such as chemical-physical methods, encapsulation and incineration are also being considered. The present report summarizes preliminary experiments that measured the feasibility of bioremediation for a contaminated site in southern Mexico.

  1. Soil washing as a potential remediation technology for contaminated DOE sites

    SciTech Connect (OSTI)

    Devgun, J.S.; Beskid, N.J. ); Natsis, M.E. ); Walker, J.S. )

    1993-01-01

    Frequently detected contaminants at US Department of Energy (DOE) sites include radionuclides, heavy metals, and chlorinated hydrocarbons. Remediation of these sites requires application of several technologies used in concert with each other, because no single technology is universally applicable. Special situations, such as mixed waste, generally require innovative technology development. This paper, however, focuses on contaminated soils, for which soil washing and vitrification technologies appear to have wide ranging application potential. Because the volumes of contaminated soils around the DOE complex are so large, soil washing can offer a potentially inexpensive way to effect remediation or to attain waste volume reduction. As costs for disposal of low-level and mixed wastes continue to rise, it is likely that volume-reduction techniques and in-situ containment techniques will become increasingly important. This paper reviews the status of the soil washing technology, examines the systems that are currently available, and discusses the potential application of this technology to some DOE sites, with a focus on radionuclide contamination and, primarily, uranium-contaminated soils

  2. Soil washing as a potential remediation technology for contaminated DOE sites

    SciTech Connect (OSTI)

    Devgun, J.S.; Beskid, N.J.; Natsis, M.E.; Walker, J.S.

    1993-03-01

    Frequently detected contaminants at US Department of Energy (DOE) sites include radionuclides, heavy metals, and chlorinated hydrocarbons. Remediation of these sites requires application of several technologies used in concert with each other, because no single technology is universally applicable. Special situations, such as mixed waste, generally require innovative technology development. This paper, however, focuses on contaminated soils, for which soil washing and vitrification technologies appear to have wide ranging application potential. Because the volumes of contaminated soils around the DOE complex are so large, soil washing can offer a potentially inexpensive way to effect remediation or to attain waste volume reduction. As costs for disposal of low-level and mixed wastes continue to rise, it is likely that volume-reduction techniques and in-situ containment techniques will become increasingly important. This paper reviews the status of the soil washing technology, examines the systems that are currently available, and discusses the potential application of this technology to some DOE sites, with a focus on radionuclide contamination and, primarily, uranium-contaminated soils

  3. Environmental Assessment of Remedial Action at the Riverton Uranium Mill Tailings Site, Riverton, Wyoming

    SciTech Connect (OSTI)

    1987-06-01

    The US Department of Energy (DOE) has prepared an environmental assessment (DOE/EA-0254) on the proposed remedial action at the inactive uranium milling site near Riverton, Wyoming. Based on the analyses in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4321, et seq.). Therefore, the preparation of an environmental impact statement (EIS) is not required.

  4. DECONTAMINATION CRITERIA FOR THE FORMER KELLEX SITE (PIERPONT PROPERTY) REMEDIAL ACTION,

    Office of Legacy Management (LM)

    DECONTAMINATION CRITERIA FOR THE FORMER KELLEX SITE (PIERPONT PROPERTY) REMEDIAL ACTION, JERSEY CITY, NEW JERSEY U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 2U545 JUNE 196B Current Federal Policy and Guidance The current guidance for Federal decisions affecting the exposure of members of the public in the U.S. remains that recommended by the Federal Radiation'Council (FRC) and issued by the President in 196U. This guidance defines the Radiation Protection Guide as "the radiation dose which

  5. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Appendix E. Final report

    SciTech Connect (OSTI)

    1988-07-01

    This document provides Appendix E of the Remedial Action Plan (RAP) presented in 1988 for the stabilization of the inactive uranium mill tailings at the Mexican Hat, Utah site. The RAP was developed to serve a two- fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley, Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. The RAP has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action.

  6. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 1, Main text. Environmental Restoration Program

    SciTech Connect (OSTI)

    Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

    1992-09-01

    This publication contains 1035 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. These citations constitute the thirteenth in a series of reports prepared annually for the US Department of Energy (DOE) Environmental Restoration programs. Citations to foreign and domestic literature of all types. There are 13 major sections of the publication, including: (1) DOE Decontamination and Decommissioning Program; (2) Nuclear Facilities Decommissioning; (3) DOE Formerly Utilized Sites Remedial Action Program; (4) DOE Uranium Mill Tailings Remedial Action Project; (5) Uranium Mill Tailings Management; (6) DOE Environmental Restoration Program; (7) DOE Site-Specific Remedial Actions; (8) Contaminated Site Restoration; (9) Remediation of Contaminated Soil and Groundwater; (10) Environmental Data Measurements, Management, and Evaluation; (11) Remedial Action Assessment and Decision-Making; (12) Technology Development and Evaluation; and (13) Environmental and Waste Management Issues. Bibliographic references are arranged in nine subject categories by geographic location and then alphabetically by first author, corporate affiliation, or publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word.

  7. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado. Remedial Action Selection Report, Appendix B of Attachment 2: Geology report, Final

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section} 7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which describes the proposed remedial action for the Naturita site. An extensive amount of data and supporting information has been generated and evaluated for this remedial action. These data and supporting information are not incorporated into this single document but are included or referenced in the supporting documents. The RAP consists of this RAS and four supporting documents or attachments. This Attachment 2, Geology Report describes the details of geologic, geomorphic, and seismic conditions at the Dry Flats disposal site.

  8. Fairfield, Ohio, Site Fact Sheet

    Office of Legacy Management (LM)

    ... AEC, a predecessor agency to DOE, established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons ...

  9. Seymour, Connecticut, Site Fact Sheet

    Office of Legacy Management (LM)

    ... AEC, a predecessor agency to DOE, established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons ...

  10. Albany, Oregon, Site Fact Sheet

    Office of Legacy Management (LM)

    ... AEC, a predecessor agency to DOE, established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons ...

  11. Toledo, Ohio, Site Fact Sheet

    Office of Legacy Management (LM)

    ... established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons and early atomic energy program. ...

  12. Painesville, Ohio, Site Fact Sheet

    Office of Legacy Management (LM)

    ... established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons and early atomic energy program. ...

  13. Hamilton, Ohio, Site Fact Sheet

    Office of Legacy Management (LM)

    ... AEC, a predecessor agency to DOE, established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons ...

  14. Beverly, Massachusetts, Site Fact Sheet

    Office of Legacy Management (LM)

    ... AEC, a predecessor agency to DOE, established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons ...

  15. Oxford, Ohio, Site Fact Sheet

    Office of Legacy Management (LM)

    ... established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons and early atomic energy program. ...

  16. Adrian, Michigan, Site Fact Sheet

    Office of Legacy Management (LM)

    ... AEC, a predecessor agency to DOE, established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons ...

  17. Berkeley, California, Site Fact Sheet

    Office of Legacy Management (LM)

    AEC, a predecessor agency to DOE, established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons ...

  18. Madison, Illinois, Site Fact Sheet

    Office of Legacy Management (LM)

    ... AEC established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons and early atomic energy ...

  19. Springdale, Pennsylvania, Site Fact Sheet

    Office of Legacy Management (LM)

    ... established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons and early atomic energy program. ...

  20. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado: Revision 2

    SciTech Connect (OSTI)

    Not Available

    1994-11-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment and a floodplain/wetlands assessment are included as part of this EA. This report and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).

  1. Environmental assessment of remedial action at the Maybell Uranium Mill Tailings Site near Maybell, Colorado. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).

  2. Finding of No Significant Impact, proposed remediation of the Maybell Uranium Mill Processing Site, Maybell, Colorado

    SciTech Connect (OSTI)

    Not Available

    1995-12-31

    The U.S. Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-0347) on the proposed surface remediation of the Maybell uranium mill processing site in Moffat County, Colorado. The mill site contains radioactively contaminated materials from processing uranium ore that would be stabilized in place at the existing tailings pile location. Based on the analysis in the EA, DOE has determined that the proposed action does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, Public Law 91-190 (42 U.S.C. {section}4321 et seq.), as amended. Therefore, preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

  3. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site near Gunnison, Colorado. Final

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    The presence of contaminated uranium mill tailings adjacent to the city of Gunnison has been a local concern for many years. The following issues were identified during public meetings that were held by the DOE prior to distribution of an earlier version of this EA. Many of these issues will require mitigation. Groundwater contamination; in December 1989, a herd of 105 antelope were introduced in an area that includes the Landfill disposal site. There is concern that remedial action-related traffic in the area would result in antelope mortality. The proposed Tenderfoot Mountain haul road may restrict antelope access to their water supply; a second wildlife issue concerns the potential reduction in sage grouse use of breeding grounds (leks) and nesting habitat; the proposed Tenderfoot Mountain haul road would cross areas designated as wetlands by US Army Corps of Engineers (COE); the proposed disposal site is currently used for grazing by cattle six weeks a year in the spring. Additional concerns were stated in comments on a previous version of this EA. The proposed action is to consolidate and remove all contaminated materials associated with the Gunnison processing site to the Landfill disposal site six air miles east of Gunnison. All structures on the site (e.g., water tower, office buildings) were demolished in 1991. The debris is being stored on the site until it can be incorporated into the disposal cell at the disposal site. All contaminated materials would be trucked to the Landfill disposal site on a to-be-constructed haul road that crosses BLM-administered land.

  4. TECHNICAL EVALUATION OF SOIL REMEDIATION ALTERNATIVES AT THE BUILDING 812 OPERABLE UNIT, LAWRENCE LIVERMORE NATIONAL LABORATORY SITE 300

    SciTech Connect (OSTI)

    Eddy-Dilek, C.; Miles, D.; Abitz, R.

    2009-08-14

    The Department of Energy Livermore Site Office requested a technical review of remedial alternatives proposed for the Building 812 Operable Unit, Site 300 at the Lawrence Livermore National Laboratory. The team visited the site and reviewed the alternatives proposed for soil remediation in the draft RI/FS and made the following observations and recommendations. Based on the current information available for the site, the team did not identify a single technology that would be cost effective and/or ecologically sound to remediate DU contamination at Building 812 to current remedial goals. Soil washing is not a viable alternative and should not be considered at the site unless final remediation levels can be negotiated to significantly higher levels. This recommendation is based on the results of soil washing treatability studies at Fernald and Ashtabula that suggest that the technology would only be effective to address final remediation levels higher than 50 pCi/g. The technical review team identified four areas of technical uncertainty that should be resolved before the final selection of a preferred remedial strategy is made. Areas of significant technical uncertainty that should be addressed include: (1) Better delineation of the spatial distribution of surface contamination and the vertical distribution of subsurface contamination in the area of the firing table and associated alluvial deposits; (2) Chemical and physical characterization of residual depleted uranium (DU) at the site; (3) Determination of actual contaminant concentrations in air particulates to support risk modeling; and (4) More realistic estimation of cost for remedial alternatives, including soil washing, that were derived primarily from vendor estimates. Instead of conducting the planned soil washing treatability study, the team recommends that the site consider a new phased approach that combines additional characterization approaches and technologies to address the technical uncertainty in the remedial decision making. The site should redo the risk calculations as the future use scenario has changed for the site. As a result, the existing model is based on very conservative assumptions that result in calculation of unreasonably low cleanup goals. Specifically, the review team proposes that LLNL consider: (1) Revising the industrial worker scenario to a reasonable maximum exposure (RME) for a site worker that performs a weekly walk down of the area for two hours for 25 years (or an alternative RME if the exposure scenario changes); (2) Revising the ESSI of 2 mg U per kg soil for the deer mouse to account for less than 0.05 of the total ingested uranium being adsorbed by the gut; (3) Revising bioaccumulation factors (BAFs) for vegetation and invertebrates that are based on 100 mg of soluble uranium per kg of soil, as the uranium concentration in the slope soil does not average 100 mg/kg and it is not all in a soluble form; and (4) Measuring actual contaminant concentrations in air particulates at the site and using the actual values to support risk calculations. The team recommends that the site continue a phased approach during remediation. The activities should focus on elimination of the principal threats to groundwater by excavating (1) source material from the firing table and alluvial deposits, and (2) soil hotspots from the surrounding slopes with concentrations of U-235 and U-238 that pose unacceptable risk. This phased approach allows the remediation path to be driven by the results of each phase. This reduces the possibility of costly 'surprises', such as failure of soil treatment, and reduces the impact of remediation on endangered habitat. Treatment of the excavated material with physical separation equipment may result in a decreased volume of soil for disposal if the DU is concentrated in the fine-grained fraction, which can then be disposed of in an offsite facility at a considerable cost savings. Based on existing data and a decision to implement the recommended phased approach, the cost of characterization, excavation and physical

  5. Field Summary Report for Remedial Investigation of Hanford Site Releases to the Columbia River, Hanford Site, Washington, Collection of Surface Water, River Sediments, and Island Soils

    SciTech Connect (OSTI)

    L. C. Hulstrom

    2009-09-28

    This report has been prepared in support of the remedial investigation of Hanford Site Releases to the Columbia River and describes the 2008/2009 data collection efforts. This report documents field activities associated with collection of sediment, river water, and soil in and adjacent to the Columbia River near the Hanford Site and in nearby tributaries.

  6. Recent Developments in DOE FUSRAP | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recent Developments in DOE FUSRAP Recent Developments in DOE FUSRAP Paper presented at the Waste Management 2013 Conference. February 24 through 28, 2013, Phoenix, Arizona. Christopher Clayton, Vijendra Kothari, Gwen Hooten, Ken Starr, U.S. Department of Energy Office of Legacy Management Cheri Bahrke, Joey Gillespie, Michael Widdop, and Bob Darr, S.M. Stoller Corporation, Contractor for the U.S. Department of Energy Office of Legacy Management PDF icon 13014b.pdf More Documents &

  7. Remedial action plan and site design for stabilization of the inactive Uranium Mill Tailings Site at Lowman, Idaho

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    The DOE proposes to achieve compliance with the proposed EPA groundwater protection standards (Subparts A and B of 40 CFR 192) by meeting the EPA maximum concentration limits (MCLs) or background concentrations for designated hazardous constituents in groundwater in the uppermost aquifer (alluvium/weathered granodiorite) at the point of compliance (POC) at the Lowman disposal site near Lowman, Idaho. The proposed remedial action in conjunction with existing hydrogeological conditions at the Lowman site will ensure sufficient protection of human health and the environment. The DOE has concluded that the EPA groundwater protection standards will be met at the POC because, with the exception of antimony, none of the hazardous constituents that exceed laboratory method detection limits within the radioactive sand pore fluids were above the proposed concentration limits. The DOE has demonstrated that antimony will meet the proposed concentration limits at the POC through attenuation in subsoils beneath the disposal cell and by dilution in groundwater underflow. The Lowman processing site is in compliance with Subpart B of 40 CFR 192 because statistical analyses of groundwater samples indicate no groundwater contamination.

  8. Scoping survey of perceived concerns, issues, and problems for near-surface disposal of FUSRAP waste

    SciTech Connect (OSTI)

    Robinson, J.E.; Gilbert, T.L.

    1982-12-01

    This report is a scoping summary of concerns, issues, and perceived problems for near-surface disposal of radioactive waste, based on a survey of the current literature. Near-surface disposal means land burial in or within 15 to 20 m of the earth's surface. It includes shallow land burial (burial in trenches, typically about 6 m deep with a 2-m cap and cover) and some intermediate-depth land burial (e.g., trenches and cap similar to shallow land burial, but placed below 10 to 15 m of clean soil). Proposed solutions to anticipated problems also are discussed. The purpose of the report is to provide a better basis for identifying and evaluating the environmental impacts and related factors that must be analyzed and compared in assessing candidate near-surface disposal sites for FUSRAP waste. FUSRAP wastes are of diverse types, and their classification for regulatory purposes is not yet fixed. Most of it may be characterized as low-activity bulk solid waste, and is similar to mill tailings, but with somewhat lower average specific activity. It may also qualify as Class A segregated waste under the proposed 10 CFR 61 rules, but the parent radionuclides of concern in FUSRAP (primarily U-238 and Th-232) have longer half-lives than do the radionuclides of concern in most low-level waste. Most of the references reviewed deal with low-level waste or mill tailings, since there is as yet very little literature in the public domain on FUSRAP per se.

  9. Post-Remediation Biomonitoring of Pesticides in Marine Waters Near the United Heckathorn Superfund Site, Richmond, California

    SciTech Connect (OSTI)

    LD Antrim; NP Kohn

    2000-09-05

    This report, PNNL-11911 Rev. 1, was published in July 2000 and replaces PNNL-11911, which was published in September 1998. The revision corrects tissue concentration units that were reported as dry weight but were actually wet weight, and updates conclusions based on the correct reporting units. Marine sediment remediation at the United Heckathorn Superfund Site was completed in April 1997. Water and mussel tissues were sampled in January 1998 from four stations near Lauritzen Canal in Richmond, California, for the first post-remediation monitoring of marine areas near the United Heckathorn Site. Dieldrin and DDT were analyzed in water samples, tissue samples from resident mussels, and tissue samples from transplanted mussels deployed for 4 months. Concentrations of dieldrin and total DDT in water and total DDT in tissue were compared to pre-remediation data available from the California State Mussel Watch program (tissues) and the Ecological Risk Assessment for the United Heckathorn Superfund Site (tissues and water). Chlorinated pesticide concentrations in water samples were similar to pre-remediation levels and did not meet remediation goals. Mean dieldrin concentrations in water ranged from 0.65 ng/L to 18.1 ng/L and were higher than the remediation goal (0.14 ng/L) at all stations. Mean total DDT concentrations in water ranged from 0.65 ng/L to 103 ng/L and exceeded the remediation goal of 0.59 ng/L. The highest concentrations of both pesticides were found in Lauritzen Canal, and the lowest levels were from the Richmond Inner Harbor Channel water. Unusual amounts of detritus in the water column at the time of sampling, particularly in Lauritzen Canal, could have contributed to the elevated pesticide concentrations and poor analytical precision.

  10. Evaluation of remedial alternatives for the Solar Ponds Plume, Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Hranac, K.C.; Chromec, F.W.; Fiehweg, R.; Hopkins, J.

    1998-07-01

    This paper describes the process used to select a remedial alternative for handling contaminated groundwater emanating from the Solar Evaporation Ponds (Solar Ponds) at the Rocky Flats Environmental Technology Site (RFETS) and prevent it from reaching the nearest surface water body, North Walnut Creek. Preliminary results of field investigations conducted to provide additional information for the alternatives analysis are also presented. The contaminated groundwater is referred to as the Solar Ponds Plume (SPP). The primary contaminants in the SPP are nitrate and uranium; however, some metals exceed the site action levels at several locations and volatile organic compounds, originating from other sources, also have been detected. Currently the SPP, local surface water runoff, and infiltrated precipitation are collected by a trench system located downgradient of the Solar Ponds and pumped to three storage tanks. The water (two to three million gallons annually) is then pumped to an on-site treatment plant for evaporation at an approximate cost of $7.57 per liter.

  11. The Use of Ecological Restoration Principles To Achieve Remedy Protection At the Fernald Preserve and Weldon Spring Sites

    SciTech Connect (OSTI)

    Powell, J.; Johnston, F.; Homer, J.; Deyo, Y.

    2008-07-01

    At both the Fernald Preserve and the Weldon Spring Site, the development of ecological restoration goals and objectives was used to complement and even enhance achievement of selected remedies. Warm-season native grasses and forbs were used for revegetation of remediated areas. The hardiness and ability to establish in low-nutrient conditions make native grasses ideal candidates for reestablishment of vegetation in excavated areas. At the Fernald Preserve, native grasses were used for vegetative cover on an on-site disposal facility as well. Also at the Fernald Preserve, excavation footprints were optimized to increase the quantity and quality of created wetlands. Drainage features in a couple instances provide passive groundwater recharge, potentially accelerating groundwater remediation efforts. In addition, a number of clean materials and structures were beneficially reused as part of ecological restoration designs, including wood-chip mulch and woody debris, clean concrete, and a rail trestle. At the Weldon Spring Site, several methods were used to control erosion for three years after the initial seeding of native species. A field evaluation of soil conditions and general species diversity was performed in 2007 and it was determined that erosion at the site was typical and repairing naturally. These approaches resulted in 'win-win' strategies needed to successfully remediate and restore complex projects such as the Fernald Preserve and Weldon Spring. (authors)

  12. Guide to ground water remediation at CERCLA response action and RCRA corrective action sites

    SciTech Connect (OSTI)

    1995-10-01

    This Guide contains the regulatory and policy requirements governing remediation of ground water contaminated with hazardous waste [including radioactive mixed waste (RMW)], hazardous substances, or pollutants/contaminants that present (or may present) an imminent and substantial danger. It was prepared by the Office of Environmental Policy and Assistance, RCRA/CERCLA Division (EH-413), to assist Environmental Program Managers (ERPMs) who often encounter contaminated ground water during the performance of either response actions under CERCLA or corrective actions under Subtitle C of RCRA. The Guide begins with coverage of the regulatory and technical issues that are encountered by ERPM`s after a CERCLA Preliminary Assessment/Site Investigation (PA/SI) or the RCRA Facility Assessment (RFA) have been completed and releases into the environment have been confirmed. It is based on the assumption that ground water contamination is present at the site, operable unit, solid waste management unit, or facility. The Guide`s scope concludes with completion of the final RAs/corrective measures and a determination by the appropriate regulatory agencies that no further response action is necessary.

  13. Bayo Canyon, New Mexico, Site Fact Sheet

    Office of Legacy Management (LM)

    ... AEC, a predecessor agency to DOE, established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons ...

  14. Granite City, Illinois, Site Fact Sheet

    Office of Legacy Management (LM)

    ... Regulatory Setting AEC established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons and early ...

  15. Jersey City, New Jersey, Site Fact Sheet

    Office of Legacy Management (LM)

    ... AEC, a predecessor agency to DOE, established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons ...

  16. Burris Park, California, Site Fact Sheet

    Office of Legacy Management (LM)

    ... Action Program (FUSRAP) in 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons and early atomic energy program. ...

  17. Chicago North, Illinois, Site Fact Sheet

    Office of Legacy Management (LM)

    ... AEC, a predecessor agency to DOE, established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons ...

  18. Chicago South, Illinois, Site Fact Sheet

    Office of Legacy Management (LM)

    ... established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons and early atomic energy program. ...

  19. Columbus East, Ohio, Site Fact Sheet

    Office of Legacy Management (LM)

    established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons and early atomic energy program. ...

  20. Wayne, New Jersey, Site Fact Sheet

    Office of Legacy Management (LM)

    ... established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons and early atomic energy program. ...

  1. New York, New York, Site Fact Sheet

    Office of Legacy Management (LM)

    ... established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons and early atomic energy program. ...

  2. Oak Ridge, Tennessee, Warehouses Site Fact Sheet

    Office of Legacy Management (LM)

    ... established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons and early atomic energy program. ...

  3. Buffalo, New York, Site Fact Sheet

    Office of Legacy Management (LM)

    ... AEC established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons and early atomic energy ...

  4. Indian Orchard, Massachusetts, Site Fact Sheet

    Office of Legacy Management (LM)

    established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons and early atomic energy program. ...

  5. Status of activities on the inactive uranium mill tailings sites remedial action program. Office of the Assistant Secretary for Environment

    SciTech Connect (OSTI)

    Not Available

    1981-04-01

    This report on the status of the Office of Environment's program for inactive uranium mill tailings sites is an analysis of the current status and a forecast of future activities of the Office of Environment. The termination date for receipt of information was September 30, 1980. Aerial radiological surveys and detailed ground radiological assessments of properties within the communities in the vicinity of the designated processing sites in Canonsburg, Pennsylvania, Salt Lake City, Utah, and Boise, Idaho led to the designation of an initial group of vicinity properties for remedial action. The potential health effects of the residual radioactive materials on or near these properties were estimated, and the Assistant Secretary for Environment recommended priorities for performing remedial action to the Department's Assistant Secretary for Nuclear Energy. In designating these properties and establishing recommended priorities for performing remedial action, the Office of Environment consulted with the Environmental Protection Agency, the Nuclear Regulatory Commission, representatives from the affected State and local governments, and individual property owners. After notifying the Governors of each of the affected States and the Navajo Nation of the Secretary of Energy's designation of processing sites within their areas of jurisdiction and establishment of remedial action priorities, a Sample Cooperative Agreement was developed by the Department in consultation with the Nuclear Regulatory Commission and provided to the affected States and the Navajo Nation for comments. During September 1980, a Cooperative Agreement with the Commonwealth of Pennsylvania for the designated Canonsburg processing site was executed by the Department. It is anticipated that a Cooperative Agreement between the State of Utah and the Department to perform remedial actions at the designated Salt Lake City site will be executed in the near future.

  6. Portsmouth Remedial Actions Documents

    Broader source: Energy.gov [DOE]

    Remedial Action documents for the Portsmouth Site Process Buildings and Complex Facilities Decontamination and Decommissioning Decision Portsmouth Site Site-Wide Waste Disposition Decision

  7. EA-1331: Remediation of Subsurface and Groundwater Contamination at the Rock Springs in situ Oil Shale Retort Site, Sweetwater County, Wyoming

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal for the Rock Springs In-Situ Oil Shale Retort Test Site remediation that would be performed at the Rock Springs site in Sweetwater...

  8. In-Situ Radiological Surveys to Address Nuclear Criticality Safety Requirements During Remediation Activities at the Shallow Land Disposal Area, Armstrong County, Pennsylvania - 12268

    SciTech Connect (OSTI)

    Norris, Phillip; Mihalo, Mark; Eberlin, John; Lambert, Mike; Matthews, Brian

    2012-07-01

    Cabrera Services Inc. (CABRERA) is the remedial contractor for the Shallow Land Disposal Area (SLDA) Site in Armstrong County Pennsylvania, a United States (US) Army Corps of Engineers - Buffalo District (USACE) contract. The remediation is being completed under the USACE's Formerly Utilized Sites Remedial Action Program (FUSRAP) which was established to identify, investigate, and clean up or control sites previously used by the Atomic Energy Commission (AEC) and its predecessor, the Manhattan Engineer District (MED). As part of the management of the FUSRAP, the USACE is overseeing investigation and remediation of radiological contamination at the SLDA Site in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), 42 US Code (USC), Section 9601 et. seq, as amended and, the National Oil and Hazardous Substance Pollution Contingency Plan (NCP), Title 40 of the Code of Federal Regulations (CFR) Section 300.430(f) (2). The objective of this project is to clean up radioactive waste at SLDA. The radioactive waste contains special nuclear material (SNM), primarily U-235, in 10 burial trenches, Cabrera duties include processing, packaging and transporting the waste to an offsite disposal facility in accordance with the selected remedial alternative as defined in the Final Record of Decision (USACE, 2007). Of particular importance during the remediation is the need to address nuclear criticality safety (NCS) controls for the safe exhumation and management of waste containing fissile materials. The partnership between Cabrera Services, Inc. and Measutronics Corporation led to the development of a valuable survey tool and operating procedure that are essential components of the SLDA Criticality Safety and Material Control and Accountability programs. Using proven existing technologies in the design and manufacture of the Mobile Survey Cart, the continued deployment of the Cart will allow for an efficient and reliable methodology to allow for the safe exhumation of the Special Nuclear Material in existing SLDA trenches. (authors)

  9. Facility Utilization and Risk Analysis for Remediation of Legacy Transuranic Waste at the Savannah River Site - 13572

    SciTech Connect (OSTI)

    Gilles, Michael L.; Gilmour, John C.

    2013-07-01

    Savannah River Nuclear Solutions (SRNS) completed the Accelerated TRU Project for remediating legacy waste at the Savannah River Site with significant cost and schedule efficiencies due to early identification of resources and utilization of risk matrices. Initial project planning included identification of existing facilities that could be modified to meet the technical requirements needed for repackaging and remediating the waste. The project schedule was then optimized by utilization of risk matrices that identified alternate strategies and parallel processing paths which drove the overall success of the project. Early completion of the Accelerated TRU Project allowed SRNS to pursue stretch goals associated with remediating very difficult TRU waste such as concrete casks from the hot cells in the Savannah River National Laboratory. Project planning for stretch goals also utilized existing facilities and the risk matrices. The Accelerated TRU project and stretch goals were funded under the American Recovery and Reinvestment Act (ARRA). (authors)

  10. Environmental assessment of no remedial action at the inactive uraniferous lignite ashing sites at Belfield and Bowman, North Dakota

    SciTech Connect (OSTI)

    1997-06-01

    The Belfield and Bowman sites were not included on the original congressional list of processing sites to be designated by the Secretary of Energy. Instead, the sites were nominated for designation by the Dakota Resource Council in a letter to the DOE (September 7, 1979). In a letter to the DOE (September 12, 1979), the state of North Dakota said that it did not believe the sites would qualify as processing sites under the Uranium Mill Tailings Radiation Control Act (UMTRCA) because the activities at the sites involved only the ashing of uraniferous lignite coal and the ash was shipped out of state for actual processing. Nevertheless, on October 11, 1979, the state of North Dakota agreed to the designation of the sites because they met the spirit of the law (reduce public exposure to radiation resulting from past uranium operations). Therefore, these sites were designated by the Secretary of Energy for remedial action. Because of the relatively low health impacts determined for these sites, they were ranked as low priority and scheduled to be included in the final group of sites to be remediated.

  11. Environmental assessment of remedial action at the Mexican Hat uranium mill tailings site, Mexican Hat, Utah. [Contains glossary

    SciTech Connect (OSTI)

    Not Available

    1987-10-01

    This document assesses the environmental impacts of the proposed remedial action at the Mexican Hat uranium mill tailings site located on the Navajo Reservation in southern Utah. The site covers 235 acres and contains 69 acres of tailings and several of the original mill structures. Remedial action must be performed in accordance with standards and with the concurrence of the US Nuclear Regulatory Commission and the Navajo Nation. The proposed action is to stabilize the tailings within the present tailings site by consolidating the tailings and associated contaminated soils into a recontoured pile. A radon barrier of compacted earth would be constructed over the pile, and various erosion control measures would be taken to assure the long-term stability of the pile. The no action alternative is also assessed in this document. 240 refs., 12 figs., 20 tabs.

  12. Environmental Assessment of remedial action at the Ambrosia Lake uranium mill tailings site, Ambrosia Lake, New Mexico

    SciTech Connect (OSTI)

    Not Available

    1987-06-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Ambrosia Lake uranium mill tailings site located near Ambrosia Lake, New Mexico. The designated site covers 196 acres and contains 111 acres of tailings and some of the original mill structures. The Uranium Mill Tailings Radiation Control Act (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for th remedial action (40 CFR Part 192). Remedial action must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated materials into a recontoured pile. A radon barrier would be constructed over the pile and various erosion protection measures would be taken to assure the long-term stability of the pile. Another alternative which would involve moving the tailings to a new location is also assessed in this document. This alternative would generally involve greater short-term impacts and costs but would result in stabilization of the tailings at an undeveloped location. The no action alternative is also assessed in this document.

  13. PROJECT STRATEGY FOR THE REMEDIATION AND DISPOSITION OF LEGACY TRANSURANIC WASTE AT THE SAVANNAH RIVER SITE, South Carolina, USA

    SciTech Connect (OSTI)

    Rodriguez, M.

    2010-12-17

    This paper discusses the Savannah River Site Accelerated Transuranic (TRU) Waste Project that was initiated in April of 2009 to accelerate the disposition of remaining legacy transuranic waste at the site. An overview of the project execution strategy that was implemented is discussed along with the lessons learned, challenges and improvements to date associated with waste characterization, facility modifications, startup planning, and remediation activities. The legacy waste was generated from approximately 1970 through 1990 and originated both on site as well as at multiple US Department of Energy sites. Approximately two thirds of the waste was previously dispositioned from 2006 to 2008, with the remaining one third being the more hazardous waste due to its activity (curie content) and the plutonium isotope Pu-238 quantities in the waste. The project strategy is a phased approach beginning with the lower activity waste in existing facilities while upgrades are made to support remediation of the higher activity waste. Five waste remediation process lines will be used to support the full remediation efforts which involve receipt of the legacy waste container, removal of prohibited items, venting of containers, and resizing of contents to fit into current approved waste shipping containers. Modifications have been minimized to the extent possible to meet the accelerated goals and involve limited upgrades to address life safety requirements, radiological containment needs, and handling equipment for the larger waste containers. Upgrades are also in progress for implementation of the TRUPACT III for the shipment of Standard Large Boxes to the Waste Isolation Pilot Plant, the US TRU waste repository. The use of this larger shipping container is necessary for approximately 20% of the waste by volume due to limited size reduction capability. To date, approximately 25% of the waste has been dispositioned, and several improvements have been made to the overall processing plan as well as facility processing rates. These lessons learned, challenges, and improvements will be discussed to aid other sites in their efforts to conduct similar activities.

  14. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Text, Appendices A--C. Final report

    SciTech Connect (OSTI)

    1988-07-01

    This Remedial Action Plan (RAP) has been developed to serve a two- fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents. Appendices A,B, and C are provided as part of this document. Appendix A presents regulatory compliance issues, Appendix B provides details of the engineering design, and Appendix C presents the radiological support plan.

  15. EM's $500,000 Investment in Contaminant Remediation Leads to Hanford Site Strategy Providing $6.35 Million in Cost Savings

    Broader source: Energy.gov [DOE]

    Through a collaborative approach between the EM Headquarters’ Office of Groundwater and Soil Remediation, the Richland Operations Office and the Pacific Northwest National Laboratory (PNNL), investments are being leveraged and integrated in applied research and site operations to provide scientifically defensible end states for environmental remediation of volatile organic contaminants in the vadose zone.

  16. Microsoft Word - FUSRAP Colonie NY.rtf

    Office of Legacy Management (LM)

    Colonie Interim Storage Site (CISS) Colonie, New York FACT SHEET Jan 2004 DESCRIPTION: The site consists of a total area of 11.2 acres plus 56 vicinity properties. The site was owned and operated by National Lead Industries (NL) from 1937-1984. The facility was used for electroplating and manufacturing various components from uranium and thorium. Radioactive materials released from the plant exhaust stacks spread to site buildings, portions of the grounds, and 56 commercial and residential

  17. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites, Slick Rock, Colorado. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (42 USC {section}7901 et seq.), hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miquel County. Contaminated materials cover an estimated 63 acres of the Union Carbide (UC) processing site and 15 ac of the North Continent (NC) processing site. The sites are within 1 mile of each other and are adjacent to the Dolores River. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown and waterborne radioactive tailings materials. The total estimated volume of contaminated materials is approximately 621,300 cubic yards (yd{sup 3}). In addition to the contamination in the two processing site areas, four VPs were found to contain contamination. As a result of the tailings being exposed to the environment, contamination associated with the UC and NC sites has leached into shallow ground water. Surface water has not been affected. The closest residence is approximately 0.3 air mi from either site. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designing site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi northeast of the sites on land administered by the Bureau of Land Management (BLM).

  18. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona. Text, Appendices A, B, and C: Final report

    SciTech Connect (OSTI)

    Not Available

    1989-08-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site near Tuba City, Arizona. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the Navajo Nation, the Hopi Tribe, US Bureau of Indian Affairs (BIA), and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE, the Navajo Nation, and the Hopi Tribe, and concurrence by NRC, becomes Appendix B of the Cooperative Agreement. Following the introduction, contents are as follows: Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3.0 summarizes the present site characteristics and provides a definition of site-specific problems. Section 4.0 is the site design for the proposed action. Section 5.0 summarizes the plan for ensuring environmental, health, and safety protection for the surrounding community and the on-site workers. Section 6.0 presents a detailed listing of the responsibilities of the project participants. Section 7.0 describes the features of the long-term surveillance and maintenance plan. Section 8.0 presents the quality assurance aspects of the project. Section 9.0 documents the ongoing activities to keep the public informed and participating in the project.

  19. Niagara Falls Storage Site annual environmental report for calendar year 1991, Lewiston, New York. [Niagara Falls Storage Site

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Niagara Falls Storage Site (NFSS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring at NFSS began in 1981. The site is owned by the US Department of Energy (DOE) and is assigned to the DOE Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at NFSS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and total uranium and radium-226 concentrations in surface water, sediments, and groundwater. Additionally, several nonradiological parameters including seven metals are routinely measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.

  20. Argonne`s Expedited Site Characterization: An integrated approach to cost- and time-effective remedial investigation

    SciTech Connect (OSTI)

    Burton, J.C.; Walker, J.L.; Aggarwal, P.K.; Meyer, W.T.

    1995-07-01

    Argonne National Laboratory has developed a methodology for remedial site investigation that has proven to be both technically superior to and more cost- and time-effective than traditional methods. This methodology is referred to as the Argonne Expedited Site Characterization (ESC). Quality is the driving force within the process. The Argonne ESC process is abbreviated only in time and cost and never in terms of quality. More usable data are produced with the Argonne ESC process than with traditional site characterization methods that are based on statistical-grid sampling and multiple monitoring wells. This paper given an overview of the Argonne ESC process and compares it with traditional methods for site characterization. Two examples of implementation of the Argonne ESC process are discussed to illustrate the effectiveness of the process in CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act) and RCRA (Resource Conservation and Recovery Act) programs.

  1. Microsoft Word - FUSRAP Wayne NJ.rtf

    Office of Legacy Management (LM)

    Wayne Interim Storage Site (WISS) Wayne, New Jersey FACT SHEET January 2004 DESCRIPTION: The Wayne site is located in a highly developed area of northern New Jersey, approximately 20 miles north-northwest of Newark, New Jersey. The site was formerly owned and operated by Rare Earths, Inc. and W.R. Grace & Co. Contamination at the property resulted from rare earths and thorium processing activities conducted at the facility during the period of 1948 to 1971. The property is now owned by the

  2. Addendum to the East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    SAIC

    2011-04-01

    The East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan (DOE 2004) describes the planned fieldwork to support the remedial investigation (RI) for residual contamination at the East Tennessee Technology Park (ETTP) not addressed in previous Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) decisions. This Addendum describes activities that will be conducted to gather additional information in Zone 1 of the ETTP for groundwater, surface water, and sediments. This Addendum has been developed from agreements reached in meetings held on June 23, 2010, August 25, 2010, October 13, 2010, November 13, 2010, December 1, 2010, and January 13, 2011, with representatives of the U. S. Department of Energy (DOE), U. S. Environmental Protection Agency (EPA), and Tennessee Department of Environment and Conservation (TDEC). Based on historical to recent groundwater data for ETTP and the previously completed Sitewide Remedial Investigation for the ETTP (DOE 2007a), the following six areas of concern have been identified that exhibit groundwater contamination downgradient of these areas above state of Tennessee and EPA drinking water maximum contaminant levels (MCLs): (1) K-720 Fly Ash Pile, (2) K-770 Scrap Yard, (3) Duct Island, (4) K-1085 Firehouse Burn/J.A. Jones Maintenance Area, (5) Contractor's Spoil Area (CSA), and (6) Former K-1070-A Burial Ground. The paper presents a brief summary of the history of the areas, the general conceptual models for the observed groundwater contamination, and the data gaps identified.

  3. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

  4. Remedial Investigation/Feasibility Study Work Plan for the 200-UP-1 Groundwater Operable Unit, Hanford Site, Richland, Washington. Revision

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This work plan identifies the objectives, tasks, and schedule for conducting a Remedial Investigation/Feasibility Study for the 200-UP-1 Groundwater Operable Unit in the southern portion of the 200 West Groundwater Aggregate Area of the Hanford Site. The 200-UP-1 Groundwater Operable Unit addresses contamination identified in the aquifer soils and groundwater within its boundary, as determined in the 200 West Groundwater Aggregate Area Management Study Report (AAMSR) (DOE/RL 1992b). The objectives of this work plan are to develop a program to investigate groundwater contaminants in the southern portion of the 200 West Groundwater Aggregate Area that were designated for Limited Field Investigations (LFIs) and to implement Interim Remedial Measures (IRMs) recommended in the 200 West Groundwater AAMSR. The purpose of an LFI is to evaluate high priority groundwater contaminants where existing data are insufficient to determine whether an IRM is warranted and collect sufficient data to justify and implement an IRM, if needed. A Qualitative Risk Assessment (QRA) will be performed as part of the LFI. The purpose of an IRM is to develop and implement activities, such as contaminant source removal and groundwater treatment, that will ameliorate some of the more severe potential risks of groundwater contaminants prior to the RI and baseline Risk Assessment (RA) to be conducted under the Final Remedy Selection (FRS) at a later date. This work plan addresses needs of a Treatability Study to support the design and implementation of an interim remedial action for the Uranium-{sup 99}{Tc}-Nitrate multi-contaminant IRM plume identified beneath U Plant.

  5. Microsoft Word - FUSRAP Maywood NJ.rtf

    Office of Legacy Management (LM)

    Maywood, New Jersey FACT SHEET January 2004 DESCRIPTION: The Maywood site is located in a highly developed area of northeastern New Jersey, in the boroughs of Maywood and Lodi and the township of Rochelle Park. It is located approximately 13 miles northeast of Newark, New Jersey. Contamination at the properties resulted from rare earths and thorium processing activities conducted at the Maywood Chemical Works (MCW) from the early 1900 through 1959. MCW stopped extracting thorium in 1959. The

  6. DOE - Office of Legacy Management -- Pennsylvania Disposal Site - PA 43

    Office of Legacy Management (LM)

    Disposal Site - PA 43 FUSRAP Considered Sites Site: Pennsylvania Disposal Site (PA.43) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is one of a group of 77 FUSRAP considered sites for which few, if any records are available in their respective site files to provide an historical account of past operations and their relationship, if

  7. Remedial actions at the former Vitro Rare Metals plant site, Canonsburg, Washington County, Pennsylvania. Final Environmental Impact Statement. Volume I

    SciTech Connect (OSTI)

    Not Available

    1983-07-01

    The environmental impacts associated with remedial actions in connection with residual radioactive materials remaining at the inactive uranium processing site located in Canonsburg, Washington County, Pennsylvania are evaluated. The Canonsburg site is an 18.5-acre property that was formerly owned by the Vitro Rare Metals Company. The expanded Canonsburg site would be 30-acre property that would include the Canonsburg site (the former Vitro Rare Metals plant), seven adjacent private houses, and the former Georges Pottery property. During the period 1942 through 1957 the Vitro Manufacturing Company and its successor, the Vitro Corporation of America, processed onsite residues and ores, and government-owned ores, concentrates, and scraps to extract uranium and other rare metals. The Canonsburg site is now the Canon Industrial Park. In addition to storing the residual radioactive materials of this process at the Canonsburg site, about 12,000 tons of radioactively contaminated materials were transferred to a railroad landfill in Burrell Township, Indiana County, Pennsylvania. This Canonsburg FEIS evaluates five alternatives for removing the potential public health hazard associated with the radioactively contaminated materials. In addition to no action, these alternatives involve various combinations of stabilization of the radioactively contaminated materials in place or decontamination of the Canonsburg and Burrell sites by removing the radioactively contaminated materials to another location. In addition to the two sites mentioned, a third site located in Hanover Township, Washington County, Pennsylvania has been considered as a disposal site to which the radioactively contaminated materials presently located at either of the other two sites might be moved.

  8. Toxic remediation

    DOE Patents [OSTI]

    Matthews, Stephen M. (Alamed County, CA); Schonberg, Russell G. (Santa Clara County, CA); Fadness, David R. (Santa Clara County, CA)

    1994-01-01

    What is disclosed is a novel toxic waste remediation system designed to provide on-site destruction of a wide variety of hazardous organic volatile hydrocarbons, including but not limited to halogenated and aromatic hydrocarbons in the vapor phase. This invention utilizes a detoxification plenum and radiation treatment which transforms hazardous organic compounds into non-hazardous substances.

  9. REVIEW REPORT: BUILDING C-400 THERMAL TREATMENT 90 PERCENT REMEDIAL DESIGN REPORT AND SITE INVESTIGATION, PGDP, PADUCAH, KENTUCKY

    SciTech Connect (OSTI)

    Looney, B; Jed Costanza, J; Eva Davis, E; Joe Rossabi, J; Lloyd Stewart, L; Hans Stroo, H

    2007-08-15

    On 9 April 2007, the U.S. Department of Energy (DOE) Headquarters, Office of Soil and Groundwater Remediation (EM-22) initiated an Independent Technical Review (ITR) of the 90% Remedial Design Report (RDR) and Site Investigation (RDSI) for thermal treatment of trichloroethylene (TCE) in the soil and groundwater in the vicinity of Building C-400 at the Paducah Gaseous Diffusion Plant (PGDP). The general ITR goals were to assess the technical adequacy of the 90% RDSI and provide recommendations sufficient for DOE to determine if modifications are warranted pertaining to the design, schedule, or cost of implementing the proposed design. The ultimate goal of the effort was to assist the DOE Paducah/Portsmouth Project Office (PPPO) and their contractor team in ''removing'' the TCE source zone located near the C-400 Building. This report provides the ITR findings and recommendations and supporting evaluations as needed to facilitate use of the recommendations. The ITR team supports the remedial action objective (RAO) at C-400 to reduce the TCE source area via subsurface Electrical Resistance Heating (ERH). Further, the ITR team commends PPPO, their contractor team, regulators, and stakeholders for the significant efforts taken in preparing the 90% RDR. To maximize TCE removal at the target source area, several themes emerge from the review which the ITR team believes should be considered and addressed before implementing the thermal treatment. These themes include the need for: (1) Accurate and site-specific models as the basis to verify the ERH design for full-scale implementation for this challenging hydrogeologic setting; (2) Flexible project implementation and operation to allow the project team to respond to observations and data collected during construction and operation; (3) Defensible performance metrics and monitoring, appropriate for ERH, to ensure sufficient and efficient clean-up; and (4) Comprehensive (creative and diverse) contingencies to address the potential for system underperformance, and other unforeseen conditions These themes weave through the ITR report and the various analyses and recommendations. The ITR team recognizes that a number of technologies are available for treatment of TCE sources. Further, the team supports the regulatory process through which the selected remedy is being implemented, and concurs that ERH is a potentially viable remedial technology to meet the RAOs adjacent to C-400. Nonetheless, the ITR team concluded that additional efforts are needed to provide an adequate basis for the planned ERH design, particularly in the highly permeable Regional Gravel Aquifer (RGA), where sustaining target temperatures present a challenge. The ERH design modeling in the 90% RDR does not fully substantiate that heating in the deep RGA, at the interface with the McNairy formation, will meet the design goals; specifically the target temperatures. Full-scale implementation of ERH to meet the RAOs is a challenge in the complex hydrogeologic setting at PGDP. Where possible, risks to the project identified in this ITR report as ''issues'' and ''recommendations'' should be mitigated as part of the final design process to increase the likelihood of remedial success. The ITR efforts were organized into five lines of inquiry (LOIs): (1) Site investigation and target zone delineation; (2) Performance objectives; (3) Project and design topics; (4) Health and safety; and (5) Cross cutting and independent cost evaluation. Within each of these LOIs, the ITR team identified a series of unresolved issues--topics that have remaining uncertainties or potential project risks. These issues were analyzed and one or more recommendations were developed for each. In the end, the ITR team identified 27 issues and provided 50 recommendations. The issues and recommendations are briefly summarized below, developed in Section 5, and consolidated into a single list in Section 6. The ITR team concluded that there are substantive unresolved issues and system design uncertainties, resulting in technical and financial risks to DOE.

  10. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  11. Tonawanda North, New York, Site, Units 1 and 2 Fact Sheet

    Office of Legacy Management (LM)

    ... established FUSRAP in March 1974 to evaluate radioactive contamination at sites where work was performed to develop the nation's nuclear weapons and early atomic energy program. ...

  12. Niagara Falls Storage Site annual environmental report for calendar year 1991, Lewiston, New York

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Niagara Falls Storage Site (NFSS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring at NFSS began in 1981. The site is owned by the US Department of Energy (DOE) and is assigned to the DOE Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at NFSS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and total uranium and radium-226 concentrations in surface water, sediments, and groundwater. Additionally, several nonradiological parameters including seven metals are routinely measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.

  13. US Department of Energy response to standards for remedial actions at inactive uranium processing sites: Proposed rule

    SciTech Connect (OSTI)

    Not Available

    1988-01-29

    The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all Title I sites. On September 24, 1987, the EPA published proposed standards (52FR36000-36008) in response to the remand. This report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project, as well as a discussion of the DOE's position on the proposed standards. The report also contains and appendix which provides supporting information and cost analyses. In order to assess the impacts of the proposed EPA standards, this report summarizes the proposed EPA standards in Section 2.0. The next three sections assess the impacts of the three parts of the EPA standards: Subpart A considers disposal sites; Subpart B is concerned with restoration at processing sites; and Subpart C addresses supplemental standards. Section 6.0 integrates previous sections into a recommendations section. Section 7.0 contains the DOE response to questions posed by the EPA in the preamble to the proposed standards. 6 refs., 5 figs., 3 tabs.

  14. DOE - Office of Legacy Management -- New Canaan Site - CT 08

    Office of Legacy Management (LM)

    Canaan Site - CT 08 FUSRAP Considered Sites Site: NEW CANAAN SITE (CT.08) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: New Canaan , Connecticut CT.08-1 Evaluation Year: 1985 CT.08-2 Site Operations: None; Investigation of area prompted by public query; no site found in New Canaan. CT.08-1 Site Disposition: Eliminated - No AEC site located in this city CT.08-2 Radioactive Materials Handled: No Primary Radioactive Materials Handled: None

  15. Microsoft Word - S04932 History final.doc

    Office of Legacy Management (LM)

    FUSRAP History of the Chupadera Mesa, NM, Site December 2008 Doc. No. S0493200 (FUSRAP NM.04-5) Page 1 of 9 FUSRAP History of the Chupadera Mesa, NM, Site The following historical summary is provided to document the inclusion of the Chupadera Mesa, NM, Site into the Formerly Utilized Sites Remedial Action Program (FUSRAP). Although no remedial action was required, the site met eligibility criterion and was included under FUSRAP, under which the final radiological surveys were performed.

  16. Remedial action plan for the inactive uranium processing site at Naturita, Colorado. Remedial action selection report: Attachment 2, geology report; Attachment 3, ground water hydrology report; Attachment 4, supplemental information

    SciTech Connect (OSTI)

    1998-03-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the U.S. Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section} 7901 et seq. Part of the UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, becomes Appendix B of the cooperative agreement between the DOE and the state of Colorado.

  17. EA-1206: Remedial Action on the Belfield and Bowman Sites, North Dakota

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal that U.S. Department of Energy's Belfield and Bowman sites would be left as they are, with the contaminated soils and other contaminated...

  18. DOE - Office of Legacy Management -- Maryland Disposal Site - MD 05

    Office of Legacy Management (LM)

    Maryland Disposal Site - MD 05 FUSRAP Considered Sites Site: MARYLAND DISPOSAL SITE (MD.05 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Baltimore - Vicinity , Maryland MD.05-1 Evaluation Year: 1989 MD.05-1 Site Operations: Proposed disposal site - never developed. MD.05-1 Site Disposition: Eliminated Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None Indicated Radiological Survey(s): None

  19. DOE - Office of Legacy Management -- Shoal Test Site - NV 03

    Office of Legacy Management (LM)

    Shoal Test Site - NV 03 FUSRAP Considered Sites Site: SHOAL TEST SITE (NV.03 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Sand Springs Range NV.03-1 Location: Near U.S. Highway 50 , Fallon , Nevada NV.03-2 Evaluation Year: 1987 NV.03-2 Site Operations: Underground nuclear detonation site. NV.03-1 Site Disposition: Eliminated - Potential for contamination remote NV.03-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: None

  20. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado. Appendix B of Attachment 3: Groundwater hydrology report, Attachment 4: Water resources protection strategy, Final

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    Attachment 3 Groundwater Hydrology Report describes the hydrogeology, water quality, and water resources at the processing site and Dry Flats disposal site. The Hydrological Services calculations contained in Appendix A of Attachment 3, are presented in a separate report. Attachment 4 Water Resources Protection Strategy describes how the remedial action will be in compliance with the proposed EPA groundwater standards.

  1. Geochemical information for sites contaminated with low-level radioactive wastes: II. St. Louis Airport Storage Site

    SciTech Connect (OSTI)

    Seeley, F.G.; Kelmers, A.D.

    1985-01-01

    The St. Louis Airport Storage Site (SLASS) became radioactively contaminated as a result of wastes that were being stored from operations to recover uranium from pitchblende ores in the 1940s and 1950s. The US Department of Energy is considering various remedial action options for the SLASS under the Formerly Utilized Site Remedial Action Program (FUSRAP). This report describes the results of geochemical investigations, carried out to support the FUSRAP activities and to aid in quantifying various remedial action options. Soil and groundwater samples from the site were characterized, and sorption ratios for uranium and radium and apparent concentration limit values for uranium were measured in soil/groundwater systems by batch contact methodology. The uranium and radium concentrations in soil samples were significantly above background near the old contaminated surface horizon (now at the 0.3/sup -/ to 0.9/sup -/m depth); the maximum values were 1566 ..mu..g/g and 101 pCi/g, respectively. Below about the 6/sup -/m depth, the concentrations appeared to be typical of those naturally present in soils of this area (3.8 +- 1.2 ..mu..g/g and 3.1 +- 0.6 pCi/g). Uranium sorption ratios showed stratigraphic trends but were generally moderate to high (100 to 1000 L/kg). The sorption isotherm suggested an apparent uranium concentration limit of about 200 mg/L. This relatively high solubility can probably be correlated with the carbonate content of the soil/groundwater systems. The lower sorption ratio values obtained from the sorption isotherm may have resulted from changes in the experimental procedure or the groundwater used. The SLASS appears to exhibit generally favorable behavior for the retardation of uranium solubilized from waste in the site. Parametric tests were conducted to estimate the sensitivity of uranium sorption and solubility to the pH and carbonate content of the system.

  2. Engineering evaluation/cost analysis for decontamination at the St. Louis Downtown Site, St. Louis, Missouri

    SciTech Connect (OSTI)

    Picel, M.H.; Hartmann, H.M.; Nimmagadda, M.R. ); Williams, M.J. )

    1991-05-01

    The US Department of Energy (DOE) is implementing a cleanup program for three groups of properties in the St. Louis, Missouri, area: the St. Louis Downtown Site (SLDS), the St. Louis Airport Site (SLAPS) and vicinity properties, and the Latty Avenue Properties, including the Hazelwood Interim Storage Site (HISS). The general location of these properties is shown in Figure 1; the properties are referred to collectively as the St. Louis Site. None of the properties are owned by DOE, but each property contains radioactive residues from federal uranium processing activities conducted at the SLDS during and after World War 2. The activities addressed in this environmental evaluation/cost analysis (EE/CA) report are being proposed as interim components of a comprehensive cleanup strategy for the St. Louis Site. As part of the Department's Formerly Utilized Sites Remedial Action Program (FUSRAP), DOE is proposing to conduct limited decontamination in support of proprietor-initiated activities at the SLDS, commonly referred to as the Mallinckrodt Chemical Works. The primary goal of FUSRAP activity at the SLDS is to eliminate potential environmental hazards associated with residual contamination resulting from the site's use for government-funded uranium processing activities. 17 refs., 3 figs., 5 tabs.

  3. Remedial investigation and feasibility study for the Lawrence Livermore National Laboratory Site 300 Pit 7 Complex

    SciTech Connect (OSTI)

    Taffet, M.J. ); Oberdorfer, J.A. ); McIlvride, W.A. )

    1989-10-01

    This report summarizes the results and conclusions of the investigation of tritium and other compounds in ground water in the vicinity of landfills at the Lawrence Livermore National Laboratory (LLNL) Site 300 Pit 7 Complex. 91 refs., 110 figs., 43 tabs.

  4. EIS-0096: Remedial Actions at the Former Vitro Rare Metals Plant Site, Canonsburg, Washington County, Pennsylvania

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy prepared this statement to evaluate the environmental impacts associated with five potential sets of actions to address the potential public health hazards of residual radioactive materials remaining at the inactive uranium processing site in Canonsburg, Pennsylvania.

  5. Remedial action plan and site design for stabilization of the inactive Uranium Mill Tailings Site at Lowman, Idaho. Attachment 4, Water resources protection strategy: Final report

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    The DOE proposes to achieve compliance with the proposed EPA groundwater protection standards (Subparts A and B of 40 CFR 192) by meeting the EPA maximum concentration limits (MCLs) or background concentrations for designated hazardous constituents in groundwater in the uppermost aquifer (alluvium/weathered granodiorite) at the point of compliance (POC) at the Lowman disposal site near Lowman, Idaho. The proposed remedial action in conjunction with existing hydrogeological conditions at the Lowman site will ensure sufficient protection of human health and the environment. The DOE has concluded that the EPA groundwater protection standards will be met at the POC because, with the exception of antimony, none of the hazardous constituents that exceed laboratory method detection limits within the radioactive sand pore fluids were above the proposed concentration limits. The DOE has demonstrated that antimony will meet the proposed concentration limits at the POC through attenuation in subsoils beneath the disposal cell and by dilution in groundwater underflow. The Lowman processing site is in compliance with Subpart B of 40 CFR 192 because statistical analyses of groundwater samples indicate no groundwater contamination.

  6. DOE - Office of Legacy Management -- West Milton Reactor Site - NY 21

    Office of Legacy Management (LM)

    Milton Reactor Site - NY 21 FUSRAP Considered Sites Site: West Milton Reactor Site (NY.21) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is one of a group of 77 FUSRAP considered sites for which few, if any records are available in their respective site files to provide an historical account of past operations and their

  7. MOVING BEYOND PUMP AND TREAT TOWARD ENHANCED ATTENUATION AND COMBINED REMEDIES T-AREA, SAVANNAH RIVER SITE

    SciTech Connect (OSTI)

    Looney, B; Brian Riha, B; Warren Hyde, W; Jay Noonkester, J; Gerald Blount, G

    2008-04-03

    Groundwater beneath T-Area, a former laboratory and semiworks operation at the Department of Energy (DOE) Savannah River Site, is contaminated by chlorinated solvents (cVOCs). Since the contamination was detected in the 1980s, the cVOCs at T-Area have been treated by a combination of soil vapor extraction and groundwater pump and treat. The site has received approval to discontinue the active treatments and implement a full scale test of enhanced attenuation--an engineering and regulatory strategy that has recently been developed by DOE and the Interstate Technology and Regulatory Council. Enhanced attenuation uses active engineering solutions to alter the target site in such a way that the contaminant plume will passively stabilize and shrink and to document that the action will be effective, timely, and sustainable. The paradigm recognizes that attenuation remedies are fundamentally based on a mass balance. Thus, long-term plume dynamics can be altered either by reducing the contaminant loading from the source or by increasing the rate of natural attenuation processes within all, or part of, the plume volume. The combination of technologies that emerged for T-Area included: (1) neat (pure) vegetable oil deployment in the deep vadose zone in the former source area, (2) emulsified vegetable oil deployment within the footprint of the groundwater plume, and (3) identification of attenuation mechanisms and rates for the distal portion of the plume. In the first part, neat oil spreads laterally forming a thin layer on the water table to intercept and reduce future cVOC loading (via partitioning) and reduce oxygen inputs (via biostimulation). In the second and third parts, emulsified oil forms active bioremediation reactor zones within the plume footprint to degrade existing groundwater contamination (via reductive dechlorination) and stimulates long-term attenuation capacity in the distal plume (via cometabolism). For T-Area, the enhanced attenuation development process proved to be a powerful tool in developing a defensible strategy that provides a high degree of performance while minimizing adverse collateral impacts of remediation (e.g., energy use and wetland damage) and minimizing life-cycle costs.

  8. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17--21, 1997

    SciTech Connect (OSTI)

    1998-01-28

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team`s findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ``US Department of Energy Voluntary Protection Program, Part 1: Program Elements`` to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA`s VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status.

  9. Environmental monitoring plan for the Niagara Falls Storage Site and the Interim Waste Containment Facility

    SciTech Connect (OSTI)

    Not Available

    1986-04-01

    As part of the US Department of Energy's (DOE) Surplus Facility Management Program (SFMP), the Niagara Falls Storage Site (NFSS) is undergoing remedial action. Vicinity properties adjacent to and near the site are being cleaned up as part of DOE's Formerly Utilized Sites Remedial Action Program (FUSRAP). These programs are a DOE effort to clean up low-level radioactive waste resulting from the early days of the nation's atomic energy program. Radioactively contaminated waste from these remedial action activities are being stored at the NFSS in an interim waste containment facility (IWCF). When the remedial actions and IWCF are completed in 1986, activities at the site will be limited to waste management. The monitoring program was prepared in accordance with DOE Order 5484.1 and is designed to determine the contribution of radioactivity from the site to the environs and to demonstrate compliance with applicable criteria. Major elements of this program will also supplement other monitoring requirements including the performance monitoring system for the IWCF and the closure/post-closure plan. Emphasis will be directed toward the sampling and analysis of groundwater, surface water, air and sediment for parameters which are known to be present in the material stored at the site. The monitoring program will employ a phased approach whereby the first 5 years of data will be evaluated, and the program will be reviewed and modified as necessary. 17 refs., 10 figs., 3 tabs.

  10. TECHNICAL EVALUATION OF REMEDIATION TECHNOLOGIES FOR PLUTONIUM-CONTAMINATED SOILS AT THE NEVADA TEST SITE (NTS)

    SciTech Connect (OSTI)

    Steve Hoeffner

    2003-12-31

    The Clemson Environmental Technologies Laboratory (CETL) was contracted by the National Energy Technology Center to evaluate technologies that might be used to reduce the volume of plutonium-contaminated soil at the Nevada Test Site. The project has been systematically approached. A thorough review and summary was completed for: (1) The NTS soil geological, geochemical and physical characteristics; (2) The characteristics and chemical form of the plutonium that is in these soils; (3) Previous volume reduction technologies that have been attempted on the NTS soils; (4) Vendors with technology that may be applicable; and (5) Related needs at other DOE sites. Soils from the Nevada Test Site were collected and delivered to the CETL. Soils were characterized for Pu-239/240, Am-241 and gross alpha. In addition, wet sieving and the subsequent characterization were performed on soils before and after attrition scrubbing to determine the particle size distribution and the distribution of Pu-239/240 and gross alpha as a function of particle size. Sequential extraction was performed on untreated soil to provide information about how tightly bound the plutonium was to the soil. Magnetic separation was performed to determine if this could be useful as part of a treatment approach. Using the information obtained from these reviews, three vendors were selected to demonstration their volume reduction technologies at the CETL. Two of the three technologies, bioremediation and soil washing, met the performance criteria. Both were able to significantly reduce the concentration plutonium in the soil from around 1100 pCi/g to 200 pCi/g or less with a volume reduction of around 95%, well over the target 70%. These results are especially encouraging because they indicate significant improvement over that obtained in these earlier pilot and field studies. Additional studies are recommended.

  11. Assessment of technologies for hazardous waste site remediation: Non-treatment technologies and pilot scale facility implementation -- excavation -- storage technology -- safety analysis and review statement. Final report

    SciTech Connect (OSTI)

    Johnson, H.R.; Overbey, W.K. Jr.; Koperna, G.J. Jr.

    1994-02-01

    The purpose of this study is to assess the state-of-the-art of excavation technology as related to environmental remediation applications. A further purpose is to determine which of the excavation technologies reviewed could be used by the US Corp of Engineers in remediating contaminated soil to be excavated in the near future for construction of a new Lock and Dam at Winfield, WV. The study is designed to identify excavation methodologies and equipment which can be used at any environmental remediation site but more specifically at the Winfield site on the Kanawha River in Putnam County, West Virginia. A technical approach was determined whereby a functional analysis was prepared to determine the functions to be conducted during the excavation phase of the remediation operations. A number of excavation technologies were identified from the literature. A set of screening criteria was developed that would examine the utility and ranking of the technologies with respect to the operations that needed to be conducted at the Winfield site. These criteria were performance, reliability, implementability, environmental safety, public health, and legal and regulatory compliance. The Loose Bulk excavation technology was ranked as the best technology applicable to the Winfield site. The literature was also examined to determine the success of various methods of controlling fugitive dust. Depending upon any changes in the results of chemical analyses, or prior remediation of the VOCs from the vadose zone, consideration should be given to testing a new ``Pneumatic Excavator`` which removes the VOCs liberated during the excavation process as they outgas from the soil. This equipment however would not be needed on locations with low levels of VOC emissions.

  12. Program plan for evaluation and remediation of the generation and release of flammable gases in Hanford Site waste tanks

    SciTech Connect (OSTI)

    Johnson, G.D.

    1991-08-01

    This program plan describes the activities being conducted for the resolution of the flammable gas problem that is associated with 23 high-level waste tanks at the Hanford Site. The classification of the wastes in all of these tanks is not final and some wastes may not be high-level wastes. However, until the characterization and classification is complete, all the tanks are treated as if they contain high-level waste. Of the 23 tanks, Tank 241-SY-101 (referred to as Tank 101-SY) has exhibited significant episodic releases of flammable gases (hydrogen and nitrous oxide) for the past 10 years. The major near-term focus of this program is for the understanding and stabilization of this tank. An understanding of the mechanism for gas generation and the processes for the episodic release will be obtained through sampling of the tank contents, laboratory studies, and modeling of the tank behavior. Additional information will be obtained through new and upgraded instrumentation for the tank. A number of remediation, or stabilization, concepts will be evaluated for near-term (2 to 3 years) applications to Tank 101-SY. Detailed safety assessments are required for all activities that will occur in the tank (sampling, removal of equipment, and addition of new instruments). This program plan presents a discussion of each task, provides schedules for near-term activities, and gives a summary of the expected work for fiscal years 1991, 1992, and 1993. 16 refs., 7 figs., 8 tabs.

  13. REMEDIAL ACTION WORK PLAN FOR THE MAYI'IOOD SITE JULY I9B4 UNITED STATES DEPARTMENT OF ENERGY

    Office of Legacy Management (LM)

    i; - i-aq'f 'l.n't{i(n ',.Jp . . f * { oRo-850 REMEDIAL ACTION WORK PLAN FOR THE MAYI'IOOD SITE JULY I9B4 UNITED STATES DEPARTMENT OF ENERGY OAK RIDGE OPERATIONS TABLE OF CONTENTS 1 . 0 I n t r o d u c t i o n a n d O b j e c t i v e s l . I B a c k g r o u n d L . 2 S i t e l d e n t i f i c a t i o n 1 . 3 P u r p o s e 2 . O S i t e D e s c r i p t i o n 2 . L S i t e L o c a t i o n a n d D e s c r i p t i o n 2 . 2 R a d i o l o g i c a l D e s c r i p t i o n 2 . 3 S i t e G e o l o g y a

  14. Baseline risk assessment for exposure to contaminants at the St. Louis Site, St. Louis, Missouri

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    The St. Louis Site comprises three noncontiguous areas in and near St. Louis, Missouri: the St. Louis Downtown Site (SLDS), the St. Louis Airport Storage Site (SLAPS), and the Latty Avenue Properties. The main site of the Latty Avenue Properties includes the Hazelwood Interim Storage Site (HISS) and the Futura Coatings property, which are located at 9200 Latty Avenue. Contamination at the St. Louis Site is the result of uranium processing and disposal activities that took place from the 1940s through the 1970s. Uranium processing took place at the SLDS from 1942 through 1957. From the 1940s through the 1960s, SLAPS was used as a storage area for residues from the manufacturing operations at SLDS. The materials stored at SLAPS were bought by Continental Mining and Milling Company of Chicago, Illinois, in 1966, and moved to the HISS/Futura Coatings property at 9200 Latty Avenue. Vicinity properties became contaminated as a result of transport and movement of the contaminated material among SLDS, SLAPS, and the 9200 Latty Avenue property. This contamination led to the SLAPS, HISS, and Futura Coatings properties being placed on the National Priorities List (NPL) of the US Environmental Protection Agency (EPA). The US Department of Energy (DOE) is responsible for cleanup activities at the St. Louis Site under its Formerly Utilized Sites Remedial Action Program (FUSRAP). The primary goal of FUSRAP is the elimination of potential hazards to human health and the environment at former Manhattan Engineer District/Atomic Energy Commission (MED/AEC) sites so that, to the extent possible, these properties can be released for use without restrictions. To determine and establish cleanup goals for the St. Louis Site, DOE is currently preparing a remedial investigation/feasibility study-environmental impact statement (RI/FS-EIS). This baseline risk assessment (BRA) is a component of the process; it addresses potential risk to human health and the environment associated wi

  15. DOE - Office of Legacy Management -- Marion Mill Site - CO 09

    Office of Legacy Management (LM)

    Mill Site - CO 09 FUSRAP Considered Sites Site: MARION MILL SITE (CO.09 ) Eliminated from further consideration under FUSRAP - deferred to the State of Colorado for appropriate action. Designated Name: Not Designated Alternate Name: None Location: Sugar Leaf Road , Boulder , Colorado CO.09-1 Evaluation Year: Circa 1983 CO.09-1 Site Operations: Milled and processed thorite and other rare earth ores in 1957 and 1958. Some of the thorium concentrate produced was shipped to Davison Chemical Company

  16. Case Study of Anomalies Encountered During Remediation of Mixed Low-Level Waste Burial Grounds in the 100 and 300 Areas of the Hanford Site

    SciTech Connect (OSTI)

    Haass, M.J.; Zacharias, P.E.; Zacharias, A.E.

    2007-07-01

    Under the U.S. Department of Energy's River Corridor Closure Project, Washington Closure Hanford has completed remediation of more than 10 mixed low-level waste burial grounds in the 100 and 300 Areas of the Hanford Site. The records of decision for the burial grounds required excavation, characterization, and transport of contaminated material to a Resource Conservation and Recovery Act of 1976-compliant hazardous waste landfill. This paper discusses a sample of the anomalous waste found during remediation and provides an overview of the waste excavation activities. The 100 Area burial grounds received plutonium production reactor waste and waste associated with various test programs. Examples of 100 Area anomalies include spent nuclear fuel, elemental mercury, reactor hardware, and the remains of animals used in testing the effects of radionuclides on living organisms. The 300 Area burial grounds received waste from research and development laboratories and fuel manufacturing operations. Of the seven 300 Area burial grounds remediated to date, the most challenging has been the 618-2 Burial Ground. It presented significant challenges because of the potential for airborne alpha contamination and the discovery of plutonium in an isotopically pure form. Anomalies encountered in the 618-2 Burial Ground included a combination safe that contained gram quantities of plutonium, miscellaneous containers of unknown liquids, and numerous types of shielded shipping casks. Information presented in this paper will be an aid to those involved in remediation activities throughout the U.S. Department of Energy complex and at other nuclear waste disposal sites. (authors)

  17. Steam and ET-DSP Combined for DNAPL Remediation: Full-Scale Site Restoration at Young- Rainey STAR Center

    Broader source: Energy.gov [DOE]

    Proceedings of the Fourth International Conference on Remediation of Chlorinated and Recalcitrant Compounds.May 2004, Monterey, California.Gorm Heron, Steven Carroll, Hank Sowers, Bruce McGee,...

  18. Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 1, Text: Final environmental impact statement

    SciTech Connect (OSTI)

    1986-12-01

    This statement evaluates and compares the environmental impacts associated with the remedial actions of the residual radioactive materials remaining at the inactive uranium processing site and associated vicinity properties at Grand Junction, Mesa County, Colorado. This statement is also intended to aid the BLM in amending their management framework plans and final resource management plan, as well as assisting in compliance with the withdrawal application as appropriate. The site is a 114-acre tract of private and state owned land which contains approximately 3.1 million cubic yards of tailings and associated contaminated soils. The vicinity properties are homes, businesses, public buildings, and vacant lots which may have been contaminated during construction by the use of tailings as building material. An estimated 3465 vicinity properties would be cleaned up during remedial action of the tailings pile. The tailings were produced by the former Climax Uranium Company which processed uranium ore, which it sold to the US Atomic Energy Commission from 1951 to 1966 and to private sources from 1966 to 1970. This statement evaluates six alternatives for stabilization and disposal of the tailings and other contaminated materials: (1) No action. (2) Stabilization at the Grand Junction site. (3) Disposal at the Cheney Reservoir site with truck transport. (4) Disposal at the Cheney Reservoir site with train and truck transport. (5) Disposal at the Two Road site with truck transport. (6) Disposal at the Two Road site with train and truck transport. All of the alternatives except no action include remedial action at an estimated 3465 vicinity properties. Alternative 3 is DOE`s preferred alternative.

  19. DOE - Office of Legacy Management -- Reactor Site - Fort Belvoir - VA 0-02

    Office of Legacy Management (LM)

    Reactor Site - Fort Belvoir - VA 0-02 FUSRAP Considered Sites Site: REACTOR SITE - FORT BELVOIR (VA.0-02 ) Eliminated from further consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: None Location: Fort Belvoir , Virginia VA.0-02-1 Evaluation Year: 1987 VA.0-02-1 Site Operations: No evidence of AEC involvement with reactor operations. AEC conducted health and safety inspections of this site. Probably a licensed operation. VA.0-02-1 Site Disposition:

  20. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. Remedial action selection report, attachment 2, geology report; attachment 3, groundwater hydrology report; and attachment 4, water resources protection strategy. Final report

    SciTech Connect (OSTI)

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the U.S. Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  1. Superfund Record of Decision (EPA Region 7): Des Moines TCE Site, Operable Unit 3, Des Moines, IA. (Second remedial action), September 1992. Final report

    SciTech Connect (OSTI)

    Not Available

    1992-09-18

    The Des Moines TCE site is located southwest of downtown Des Moines, Polk County, Iowa. Land use in the area is predominantly industrial and commercial, and part of the site lies within the floodplain of the Raccoon River. Water from the Des Moines Water Works north infiltration gallery was found to be contaminated with trichloroethylene (TCE), dichloroethylene (DCE), and vinyl chloride at levels above accepted drinking water standards. The ROD addresses OU3, which encompasses potential sources of ground water contamination in an area north of the Raccoon River. The selected remedial action for OU3 includes no action with periodic groundwater monitoring.

  2. Remedial Action Plan and Site design for stabilization of the inactive Uranium Mill Tailings sites at Slick Rock, Colorado: Revision 1. Remedial action selection report, Attachment 2, geology report, Attachment 3, ground water hydrology report, Attachment 4, water resources protection strategy. Final

    SciTech Connect (OSTI)

    1995-09-01

    The Slick Rock uranium mill tailings sites are located near the small community of Slick Rock, in San Miguel County, Colorado. There are two designated Uranium Mill Tailings Remedial Action (UMTRA) Project sites at Slick Rock: the Union Carbide site and the North Continent site. Both sites are adjacent to the Dolores River. The sites contain former mill building concrete foundations, tailings piles, demolition debris, and areas contaminated by windblown and waterborne radioactive materials. The total estimated volume of contaminated materials is approximately 621,000 cubic yards (475,000 cubic meters). In addition to the contamination at the two processing site areas, 13 vicinity properties were contaminated. Contamination associated with the UC and NC sites has leached into ground water. Pursuant to the requirements of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC {section}7901 et seq.), the proposed remedial action plan (RAP) will satisfy the final US Environmental Protection Agency (EPA) standards in 40 CFR Part 192 (60 FR 2854) for cleanup, stabilization, and control of the residual radioactive material (RRM) (tailings and other contaminated materials) at the disposal site at Burro Canyon. The requirements for control of the RRM (Subpart A) will be satisfied by the construction of an engineered disposal cell. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/weaterborne materials to a permanent repository at the Burro Canyon disposal site. The site is approximately 5 road mi (8 km) northeast of the mill sites on land recently transferred to the DOE by the Bureau of Land Management.

  3. Modification to the Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Volume 1, Text, Attachments 1--6. Final report

    SciTech Connect (OSTI)

    1989-01-01

    This document provides the modifications to the 1988 Remedial Action Plan (RAP) of the contaminated materials at the Monument Valley, Arizona, and Mexican Hat, Utah. The text detailing the modifications and attachments 1 through 6 are provided with this document. The RAP was developed to serve a two-fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley, Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. This document has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action. Pertinent information and data are included with reference given to the supporting documents.

  4. DOE - Office of Legacy Management -- Lowman Mill Site - ID 01

    Office of Legacy Management (LM)

    Lowman Mill Site - ID 01 FUSRAP Considered Sites Site: Lowman Mill Site (ID.01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Lowman, Idaho, Disposal Site Documents Related to Lowman Mill Site

  5. Superfund Record of Decision (EPA Region 9): Stringfellow acid pits site, Glen Avon, California (second remedial action), June 1987. Final report

    SciTech Connect (OSTI)

    Not Available

    1987-06-25

    The Stringfellow site is located in Riverside County, California. Approximately 34,000,000 gallons of industrial waste, primarily from metal finishing, electroplating, and DDT production were deposited in onsite evaporation ponds. In 1972, the site was voluntarily closed. The primary contaminants of concern affecting onsite and downgradient ground-water include: organics including TCE, inorganics, and metals. The selected remedial action for the site includes: installation of a ground water barrier system in the lower canyon area and treatment of extracted ground water, if necessary, followed by discharge to a publicly owned treatment works installation of a peripheral channel around the north end of the original site to direct upgradient surface-water runoff; and extension of the existing gunite channels southward to discharge surface water to Pyrite Creek.

  6. Long-Term Surveillance and Maintenance Program 2003 Report | Department of

    Office of Environmental Management (EM)

    Energy Program 2003 Report Long-Term Surveillance and Maintenance Program 2003 Report Long-Term Surveillance and Maintenance Program 2003 Report PDF icon Long-Term Surveillance and Maintenance Program 2003 Report More Documents & Publications Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites FUSRAP Stakeholder Report

  7. Work plan for the remedial investigation/feasibility study-environmental assessment for the quarry residuals operable unit at the Weldon Spring Site

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    The US Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, which is located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. The Weldon Spring site consists of two noncontiguous areas -- the chemical plant area, which includes four raffinate pits, and the quarry. Cleanup activities at the Weldon Spring site are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, incorporating the values of the National Environmental Policy Act (NEPA). The contents of the documents prepared for the project are not intended to represent a statement regarding the legal applicability of NEPA to remedial actions conducted under CERCLA. In accordance with the integrated CERCLA/NEPA approach, a remedial investigation/feasibility study-environmental assessment (RI/FS-EA) is being conducted to evaluate conditions and potential responses for the quarry residuals operable unit (QROU). This operable unit consists of the following areas and/or media: the residual material remaining at the Weldon Spring quarry after removal of the pond water and bulk waste; underlying groundwater; and other media located in the surrounding vicinity of the quarry, including adjacent soil, surface water, and sediment in Femme Osage Slough. This work plan identifies the activities within the RI/FS-EA process that are being proposed to address contamination remaining at the quarry area.

  8. Voluntary Protection Program Onsite Review, Savannah River Remediation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savannah River Remediation, Llc, Liquid Waste Contract, Savannah River Site - November 2014 Voluntary Protection Program Onsite Review, Savannah River Remediation, Llc, Liquid...

  9. EIS-0111: Remedial Actions at the Former Vanadium Corporation of America Uranium Mill Site, Durango, La Plata County, Colorado

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this statement to evaluate the environmental impacts of several scenarios for management and control of the residual radioactive wastes at the inactive Durango, Colorado, uranium processing site, including a no action alternative, an alternative to manage wastes on site, and three alternatives involving off-site management and decontamination of the Durango site.

  10. DOE Selects CH2M Hill Plateau Remediation Company for Plateau Remediation

    Energy Savers [EERE]

    Contract at its Hanford Site | Department of Energy CH2M Hill Plateau Remediation Company for Plateau Remediation Contract at its Hanford Site DOE Selects CH2M Hill Plateau Remediation Company for Plateau Remediation Contract at its Hanford Site June 19, 2008 - 1:29pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that CH2M Hill Plateau Remediation Company has been selected as the plateau remediation contractor for DOE's Hanford Site in southeastern Washington

  11. Hazelwood Interim Storage Site annual environmental report for calendar year 1991, Hazelwood, Missouri. [Hazelwood Interim Storage Site

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.

  12. POSTCLOSURE GROUNDWATER REMEDIATION AND MONITORING AT THE SANITARY LANDFILL, SAVANNAH RIVER SITE TRANSITIONING TO MONITORED NATURAL ATTENUATION

    SciTech Connect (OSTI)

    Ross, J; Walt Kubilius, W; Thomas Kmetz, T; D Noffsinger, D; Karen M Adams, K

    2006-11-17

    Resource Conservation and Recovery Act (RCRA) requirements for hazardous waste facilities include 30 years of post-closure monitoring. The use of an objective-based monitoring strategy allows for a significant reduction in the amount of groundwater monitoring required, as the groundwater remediation transitions from an active biosparging system to monitored natural attenuation. The lifecycle of groundwater activities at the landfill has progressed from detection monitoring and plume characterization, to active groundwater remediation, and now to monitored natural attenuation and postclosure monitoring. Thus, the objectives of the groundwater monitoring have changed accordingly. Characterization monitoring evaluated what biogeochemical natural attenuation processes were occurring and determined that elevated levels of radium were naturally occurring. Process monitoring of the biosparging system required comprehensive sampling network up- and down-gradient of the horizontal wells to verify its effectiveness. Currently, the scope of monitoring and reporting can be significantly reduced as the objective is to demonstrate that the alternate concentration limits (ACL) are being met at the point of compliance wells and the maximum contaminant level (MCL) is being met at the surface water point of exposure. The proposed reduction is estimated to save about $2M over the course of the remaining 25 years of postclosure monitoring.

  13. DOE Selects CH2M Hill Plateau Remediation Company for Plateau...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CH2M Hill Plateau Remediation Company for Plateau Remediation Contract at its Hanford Site DOE Selects CH2M Hill Plateau Remediation Company for Plateau Remediation Contract at its ...

  14. DOE - Office of Legacy Management -- Trinity Test Site - NM 17

    Office of Legacy Management (LM)

    Trinity Test Site - NM 17 FUSRAP Considered Sites Site: TRINITY TEST SITE (NM.17 ) Eliminated from consideration under FUSRAP - U.S. Army controls site Designated Name: Not Designated Alternate Name: None Location: missile range - 30 miles west of Carrizozo , White Sands , New Mexico NM.17-1 Evaluation Year: 1985 NM.17-1 Site Operations: Detonation of the first atomic bomb occurred at this site. NM.17-1 Site Disposition: Eliminated NM.17-1 Radioactive Materials Handled: Yes Primary Radioactive

  15. Remedial Action Performed

    Office of Legacy Management (LM)

    Aliquippa Forge Site in Aliquippa, Pennsylvania Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKE.~ FOR THE REMEDIAL ACTION PERFORMED AT THE ALIQUIPPA FORGE SITE IN ALIQUIPPA, PENNSYLVANIA NOVEMBER 1996 Prepared for . UNITED STATES DEPARTMENT OF ENERGY Oak Ridge Operations Office Under Contract No. DE-AC05-9 1 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES v . . . . . . . . . . .

  16. Remedial Action Performed

    Office of Legacy Management (LM)

    Baker and Williams Warehouses Site in New York, New York, 7997 - 7993 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 7 995 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE BAKER AND WILLIAMS WAREHOUSES SITE IN NEW YORK, NEW YORK, 1991-1993 NOVEMBER 1995 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC05-910R21949 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 __

  17. Remedial Action Performed

    Office of Legacy Management (LM)

    Alba Craft Laboratory and Vicinity Properties Site in Oxford, Ohio C Department of Energy Former Sites Restoration Division Oak Ridge Operations Office January 1997 $$@T Op% 3 @!B . i~d!l Ab Printed on recycled/recyclable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE FORMER ALBA CRAFT LABORATORY AND VICINITY PROPERTIES SITE IN OXFORD, OHIO JANUARY 1997 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC0591 OR2 1949 Bechtel

  18. Remedial Action Performed

    Office of Legacy Management (LM)

    ' at the C. H. Schnoor Site, Springdale, Pennsylvania, in 1 994 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE C. H. SCHNOOR SITE SPRINGDALE, PENNSYLVANIA, IN 1994 NOVEMBER 1996 prep&ed for United States Department of ~nergy Oak Ridge Operations Off= r Under Contract No. DE-AC05-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. '14501 CONTENTS FIGURES . . . . .

  19. DOE - Office of Legacy Management -- Belfield Mill Site - ND 0-01

    Office of Legacy Management (LM)

    Belfield Mill Site - ND 0-01 FUSRAP Considered Sites Site: Belfield Mill Site (ND.0-01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see http://www.em.doe.gov/SiteInfo/BelfieldAshingFacility.aspx Documents Related to Belfield Mill Site

  20. DOE - Office of Legacy Management -- Bowman Mill Site - ND 0-02

    Office of Legacy Management (LM)

    Bowman Mill Site - ND 0-02 FUSRAP Considered Sites Site: Bowman Mill Site (ND.0-02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see http://www.em.doe.gov/SiteInfo/BowmanAshingFacility.aspx Documents Related to Bowman Mill Site

  1. Remedial action and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Attachment 2, Geology report: Appendix B, Preliminary final

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    Detailed investigations of geologic, geomorphic, and seismic conditions at the Burro Canyon site were conducted by the US Department of Energy (DOE) as a disposal site for the tailings at two processing sites near the Slick Rock, Colorado, post office. The purposes of these studies are basic site characterization and identification of potential geologic hazards that could affect long-term site stability. Subsequent engineering studies (e.g., analyses of hydrologic and liquefaction hazards) used the data developed in these studies. The geomorphic analysis was employed in the design of effective erosion protection. Studies of the regional and local seismotectonic setting, which included a detailed search for possible capable faults within a 65-km radius of the site, provided the basis for seismic design parameters.

  2. EIS-0099: Remedial Actions at the Former Vitro Chemical Company Site, South Salt Lake, Salt Lake County, Utah

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy developed this statement to evaluate the environmental impacts of various scenarios associated with the cleanup of those residues remaining at the abandoned uranium mill tailings site located in South Salt Lake, Utah.

  3. Superfund Record of Decision (EPA Region 5): Seymour Recycling Corporation site, Seymour, Indiana (second remedial action), September 1987. Final report

    SciTech Connect (OSTI)

    Not Available

    1987-09-30

    The Seymour Recycling Corporation (SRC) site, encompassing a fourteen-acre area, is approximately two miles southwest of Seymour, Indiana. SRC and its corporate predecessor, Seymour Manufacturing Company, processed, stored, and incinerated chemical wastes at the site from about 1970 to early 1980. The facility was closed when SRC failed to comply with a 1978 agreement with the State of Indiana to cease receiving wastes and to institute better waste-management practices. In 1980, several thousand drums were removed from the site by two potentially responsible parties (PRPs). In 1981, the U.S. EPA removed chemicals from tanks at the site and disposed of those wastes offsite. A 1982 Consent Decree with potential PRPs resulted in the removal, between December 1982 and January 1984, of approximately 50,000 drums, 100 storage tanks and the first foot of contaminated soil from about 75 percent of the site's surface. A Record of Decision, signed in September 1986, evaluated the stabilization of the ground water plume emanating from the site and selected the implementation of a plume stabilization system to extract, treat and discharge ground water to a waste water treatment plant.

  4. DOE - Office of Legacy Management -- Tatum Salt Dome Test Site - MS 01

    Office of Legacy Management (LM)

    Tatum Salt Dome Test Site - MS 01 FUSRAP Considered Sites Site: Tatum Salt Dome Test Site (MS.01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Documents Related to Tatum Salt Dome Test Site

  5. DOE - Office of Legacy Management -- Commercial (Burial) Disposal Site

    Office of Legacy Management (LM)

    Maxey Flats Disposal Site - KY 02 Commercial (Burial) Disposal Site Maxey Flats Disposal Site - KY 02 FUSRAP Considered Sites Site: Commercial (Burial) Disposal Site, Maxey Flats Disposal Site (KY.02) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Maxey Flats, Kentucky, Site Documents Related to Commercial (Burial) Disposal Site,

  6. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Gunnison, Colorado. Attachment 2, Geology report: Final report

    SciTech Connect (OSTI)

    Not Available

    1992-10-01

    Detailed investigations of geologic, geomorphic, and seismic conditions at the Landfill disposal site were conducted. The purpose of these studies was basic site characterization and identification of potential geologic hazards that could affect long-term site stability. Subsequent engineering studies, such as analyses of hydrologic and liquefaction hazards, used the data developed in these studies. The geomorphic analysis was employed in the design of effective erosion protection. Studies of the regional and local seismotectonic setting, which included a detailed search for possible capable faults within a 65-kilometer (km) (40-mile) radius of the site, provided the basis for seismic design parameters. The scope of work performed included the following: Compilation and analysis of previous published and unpublished geologic literature and maps. Review of historical and instrumental earthquake data. Review of site-specific subsurface geologic data, including lithologic and geophysical logs of exploratory boreholes advanced in the site area. Photogeologic interpretations of existing conventional aerial photographs. Ground reconnaissance and mapping of the site region.

  7. Agencies plan continued DOE landfill remediation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agencies plan continued DOE landfill remediation The U.S. Department of Energy (DOE), Idaho Department of Environmental Quality and U.S. Environmental Protection Agency have released a planning document that specifies how DOE will continue to remediate a landfill containing hazardous and transuranic waste at DOE's Idaho Site located in eastern Idaho. The Phase 1 Remedial Design/Remedial Action Work Plan for Operable Unit 7-13/14 document was issued after the September 2008 Record of Decision

  8. Attenuation Based Remedies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Attenuation Based Remedies Attenuation Based Remedies The mission of the Attenuation Based Remedies in the Subsurface Applied Field Research Initiative is to seek holistic solutions to DOE's groundwater contamination problems that consider not only the technical aspects of a waste site, but regulator, stakeholder, and end-user concerns as well. PDF icon Attenuation Based Remedies More Documents & Publications Chairs Meeting - June 2011 CX-010119: Categorical Exclusion Determination ASCEM

  9. Soil & Groundwater Remediation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soil & Groundwater Remediation Soil & Groundwater Remediation Soil & Groundwater Remediation The U.S. Department of Energy (DOE) manages one of the largest groundwater and soil remediation efforts in the world. The inventory at the DOE sites includes 6.5 trillion liters of contaminated groundwater, an amount equal to about four times the daily U.S. water consumption, and 40 million cubic meters of soil and debris contaminated with radionuclides, metals, and organics. The Office of

  10. DOE - Office of Legacy Management -- Exxon Ray Point Site - 032

    Office of Legacy Management (LM)

    Exxon Ray Point Site - 032 FUSRAP Considered Sites Site: Exxon Ray Point Site (032) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is a Uranium Mill Tailings Rmedial Action (UMTRA) title II site located in Texas. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings Radiation

  11. DOE - Office of Legacy Management -- Hecla Durita Site - 012

    Office of Legacy Management (LM)

    Hecla Durita Site - 012 FUSRAP Considered Sites Site: Hecla Durita Site (012 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Hecla site is a Uranium Mill Tailings Radiation Control Act (UMTRCA) Title II site located in Durita, Colorado. UMTRCA Title II sites are privately owned and operated sites that were active when the Uranium Mill

  12. Hazelwood Interim Storage Site environmental report for calendar year 1989, Hazelwood, Missouri

    SciTech Connect (OSTI)

    Not Available

    1990-05-01

    The environmental monitoring program, begun in 1984, was continued during 1989 at the Hazelwood Interim Storage Site (HISS), a US Department of Energy (DOE) facility located in the City of Hazelwood, Missouri. HISS is currently used for storage of soils contaminated with residual radioactive material. HISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive material remains from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The monitoring program at HISS measures radon concentrations in air; external gamma radiation levels; and uranium, radium, and thorium concentrations in surface water, groundwater, and sediment. Additionally, several nonradiological parameters are measured in groundwater. To verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and assess its potential effect on public health, the radiation dose was calculated for a hypothetical maximally exposed individual. This report presents the findings of the environmental monitoring conducted at HISS during calendar year 1989. 19 refs., 14 figs., 13 tabs.

  13. Hazelwood Interim Storage Site annual environmental report for calendar year 1991, Hazelwood, Missouri

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.

  14. Hazelwood Interim Storage Site environmental monitoring summary, Hazelwood, Missouri, calendar year 1984

    SciTech Connect (OSTI)

    Not Available

    1985-07-01

    The Hazelwood Interim Storage Site (HISS) is located at 9200 Latty Avenue, Hazelwood, Missouri. The property on which the HISS is situated is owned by the Jarboe Realty and Investment Company and is leased to Futura Coatings, Inc. Radiological surveys in 1977 and 1982 indicated uranium and thorium contamination and elevated radiation levels in the soil on this property and several others in the immediate vicinity. As part of the research and development program authorized by Congress under the 1984 Energy and Water Appropriations Act, Bechtel National, Inc. (BNI) is conducting remedial action on-site and at the vicinity properties. The work is being performed as part of the US Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). Jarboe Realty and Investment Company has agreed to permit DOE to store contaminated material from the FY 1984 and 1985 Latty Avenue cleanup on its property. The contaminated material will be added to the existing pile created during the earlier site cleanup. The pile will then be covered to prevent erosion or migration of contamination. The property will be maintained as the HISS by DOE until final disposition for these materials is determined. BNI is conducting a surveillance monitoring program at the HISS during the interim storage period to detect potential migration of contaminants from the storage pile via air, water, and sediment. This summary provides these monitoring data for calendar year 1984. 6 refs., 4 tabs.

  15. Hazelwood Interim Storage Site environmental report for calendar year 1992, 9200 Latty Avenue, Hazelwood, Missouri

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    This report describes the environmental surveillance program at the Hazelwood Interim storage Site (HISS) and surrounding area, provides the results for 1992, and discusses applicable environmental standards and requirements with which the results were compared. HISS is located in eastern Missouri in the City of Hazelwood (St. Louis County) and occupies approximately 2.2 ha (5.5 acres). Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), which was established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. In 1992 there were no environmental occurrences or unplanned contaminant releases as defined in DOE requirements and in the Superfund Amendment and Reauthorization Act (SARA) Title III of CERCLA.

  16. DOE - Office of Legacy Management -- Wayne Site - NJ 16

    Office of Legacy Management (LM)

    Wayne Site - NJ 16 FUSRAP Considered Sites Wayne, NJ Alternate Name(s): Wayne Interim Storage Site (WISS) W.R. Grace and Company W.R. Grace Site Rare Earths, Inc. Davison Chemical Division NJ.16-1 NJ.16-2 NJ.16-3 Location: 868 Black Oak Ridge Road, Wayne, New Jersey NJ.16-5 Historical Operations: Produced crude thorium hydroxide and rare earth elements from monazite sands. Site was also used for interim storage of contaminated material removed from vicinity properties under FUSRAP. NJ.16-5

  17. 2009-05 "2011 Priorities for LANL Remediation"

    Broader source: Energy.gov [DOE]

    Approved May 14, 2009 The NNMCAB supports LANS/LANL in its goals for remediation of the Legacy Waste Sites.

  18. DOE - Office of Legacy Management -- Uravan Mill Site - CO 02

    Office of Legacy Management (LM)

    Uravan Mill Site - CO 02 FUSRAP Considered Sites Site: Uravan Mill Site (CO.02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Naturita, Colorado, Processing Site Documents Related to Uravan Mill Site Data Validation Package for the July and October 2008 Water Sampling at the Naturita Processing and Disposal Sites Data Validation

  19. DOE - Office of Legacy Management -- Edgemont Mill Site - SD 01

    Office of Legacy Management (LM)

    Edgemont Mill Site - SD 01 FUSRAP Considered Sites Site: Edgemont Mill Site (SD.01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Edgemont, South Dakota, Disposal Site Documents Related to Edgemont Mill Site 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal

  20. PIA - Savannah River Remediation Accreditation Boundary (SRR AB) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Remediation Accreditation Boundary (SRR AB) PIA - Savannah River Remediation Accreditation Boundary (SRR AB) PIA - Savannah River Remediation Accreditation Boundary (SRR AB) PDF icon PIA - Savannah River Remediation Accreditation Boundary (SRR AB) More Documents & Publications PIA - Savannah River Nuclear Solution IBARS Srs Site Apps. Accreditation Boundary PIA - WEB Physical Security Major Application Occupational Medical Surveillance System (OMSS) PIA, Idaho

  1. Savannah River Site, Liquid Waste Program, Savannah River Remediation American Recovery and Reinvestment Act Benefits and Lessons Learned - 12559

    SciTech Connect (OSTI)

    Schmitz, Mark A.; Crouse, Thomas N.

    2012-07-01

    Utilizing funding provided by the American Recovery and Reinvestment Act (ARRA), the Liquid Waste Program at Savannah River site successfully executed forty-one design, procurement, construction, and operating activities in the period from September 2009 through December 2011. Project Management of the program included noteworthy practices involving safety, integrated project teams, communication, and cost, schedule and risk management. Significant upgrades to plant capacity, progress toward waste tank closure and procurement of needed infrastructure were accomplished. Over 1.5 million hours were worked without a single lost work day case. Lessons Learned were continually identified and applied to enhance the program. Investment of Recovery Act monies into the Liquid Waste Program has ensured continued success in the disposition of radioactive wastes and the closure of high level waste tanks at SRS. The funding of a portion of the Liquid Waste Program at SRS by ARRA was a major success. Significant upgrades to plant capacity, progress toward waste tank closure and procurement of needed infrastructure was accomplished. Integrated Project Teams ensured quality products and services were provided to the Operations customers. Over 1.5 million hours were worked without a single lost work day case. Lessons Learned were continually reviewed and reapplied to enhance the program. Investment of Recovery Act monies into the Liquid Waste Program has ensured continued success in the disposition of radioactive wastes and the closure of high level waste tanks at SRS. (authors)

  2. DOE - Office of Legacy Management -- Project Gnome Site - NM 12

    Office of Legacy Management (LM)

    Gnome Site - NM 12 FUSRAP Considered Sites Site: Project Gnome Site (NM.12) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Gnome-Coach, New Mexico, Site Documents Related to Project Gnome Site Conditional Certificate of Completion. Attached letter from New Mexico Environment Department of DOE dated September 25, 2014. Fact Sheet

  3. Environmental Cleanup and Remediation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleanup /environment/_assets/images/icon_earthday.jpg Environmental Cleanup: Cleaning the Past Our goal is to clean up legacy waste sites and contaminated areas to protect human health and the environment, now and for years to come. WIPP Accident Investigation Board Report» Feature Stories» What We Clean Up & Why» TOP STORIES - highlights of our science, people, technologies close Environmental Remediation program completes legacy mercury cleanup near Smith's Marketplace To reduce its

  4. Microsoft Word - S07566_Requirements

    Office of Environmental Management (EM)

    Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document supersedes DOE-LM/GJ1242-2006, Long-Term Surveillance and Maintenance Needs Assessment for the 25 DOE FUSRAP Sites (S01649), December 2006 March 2011 LMS/FUSRAP/S07566 This page intentionally left blank LMS/FUSRAP/S07566 Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document supersedes DOE-LM/GJ1242-2006, Long-Term Surveillance and Maintenance Needs Assessment for

  5. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  6. A data base for low-level radioactive waste disposal sites

    SciTech Connect (OSTI)

    Daum, M.L.; Moskowitz, P.D.

    1989-07-01

    A computerized database was developed to assist the US Environmental Protection Agency (EPA) in evaluating methods and data for characterizing health hazards associated with land and ocean disposal options for low-level radioactive wastes. The data cover 1984 to 1987. The types of sites considered include Nuclear Regulatory Commission (NRC) licensed commercial disposal sites, EPA National Priority List (NPL) sites, US Department of Energy (DOE) Formerly Utilized Sites Remedial Action Project (FUSRAP) and DOE Surplus Facilities Management Program (SFMP) sites, inactive US ocean disposal sites, and DOE/Department of Defense facilities. Sources of information include reports from EPA, the US Department of Energy (DOE) and the Nuclear Regulatory Commission (NRC), as well as direct communication with individuals associated with specific programs. The data include site descriptions, waste volumes and activity levels, and physical and radiological characterization of low-level wastes. Additional information on mixed waste, packaging forms, and disposal methods were compiled, but are not yet included in the database. 55 refs., 4 figs., 2 tabs.

  7. B-BLISS AND LAUGHLIN FUSRAP SITE ADMINISTRATIVE RECORD FILE INDEX

    Office of Legacy Management (LM)

  8. DOE - Office of Legacy Management -- Nevada Test Site - 023

    Office of Legacy Management (LM)

    Nevada Test Site - 023 FUSRAP Considered Sites Site: Nevada Test Site (023) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Nevada Test Site was established by the Atomic Energy Commission in the 1950's to conduct field testing of nuclear explosives in connection with the research and development of nuclear weapons. The environmental

  9. X-701B Groundwater Remedy Portsmouth Ohio | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Full Document and Summary Versions are available for download PDF icon X-701B Groundwater Remedy Portsmouth Ohio PDF icon Summary - X-701B Groundwater Remedy, Portsmouth, Ohio More Documents & Publications Portsmouth Integration Director's Final Findings and Order Building C-400 Thermal Treatment 90% Remedial Design Report and Site Investigation Groundwater Contamination and Treatment at Department of Energy Sites

  10. DOE - Office of Legacy Management -- Palmerton Ore Buying Site - PA 33

    Office of Legacy Management (LM)

    Palmerton Ore Buying Site - PA 33 FUSRAP Considered Sites Site: PALMERTON ORE BUYING SITE (PA.33) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: New Jersey Zinc Company PA.33-1 Location: Palmerton , Pennsylvania PA.33-2 Evaluation Year: 1994 PA.33-3 Site Operations: Mid-1950s - AEC leased the New Jersey Zinc Company property and established a uranium ore stockpile on the property in the vicinity of Palmerton, PA. PA.33-4 Site Disposition:

  11. Hazelwood Interim Storage Site environmental surveillance report for calendar year 1993

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This report summarizes the results of environmental surveillance activities conducted at the Hazelwood Interim Storage Site (HISS) during calendar year 1993. It includes an overview of site operations, the basis for monitoring for radioactive and non-radioactive parameters, summaries of environmental program at HISS, a summary of the results, and the calculated hypothetical radiation dose to the offsite population. Environmental surveillance activities were conducted in accordance with the site environmental monitoring plan, which describes the rationale and design criteria for the surveillance program, the frequency of sampling and analysis, specific sampling and analysis procedures, and quality assurance requirements. The US Department of Energy (DOE) began environmental monitoring of HISS in 1984, when the site was assigned to DOE by Congress through the energy and Water Development Appropriations Act and subsequent to DOE`s Formerly Utilized Sites Remediation Action Program (FUSRAP). Contamination at HISS originated from uranium processing work conducted at Mallinckrodt Chemical Works at the St. Louis Downtown Site (SLDS) from 1942 through 1957.

  12. Remedial Action Assessment System

    Energy Science and Technology Software Center (OSTI)

    1997-02-01

    RAAS1.1 is a software-based system designed to assist remediation professionals at each stage of the environmental analysis process. RAAS1.1 provides a template for environmental restoration analysis, and provides the user with key results at each step in the analysis. RAAS1.1 assists the user to develop a coherent and consistent site description, estimate baseline and residual risk to public health from the contaminated site, identify applicable environmental restoration technologies, and formulate feasible remedial response alternatives. Inmore » addition, the RAAS1.1 methodology allows the user to then assess and compare those remedial response alternatives across EPA criteria, including: compliance with objectives; short-term and long-term effectiveness; extent of treatment; and implementability of the technologies. The analytic methodology is segmented and presented in a standardized, concise, easy-to-use format that can be viewed on the personal computer screen, saved and further manipulated, or printed for later use. Each screen and analytic step is accessed via a user-friendly personal computer graphical interface. Intuitively-designed buttons, menus, and lists help the user focus in on the particular information and analysis component of interest; the corresponding results are presented in a format that facilitates their use in decision-making.« less

  13. Process for Transition of Responsibilities | Department of Energy

    Energy Savers [EERE]

    Responsibilities Process for Transition of Responsibilities Process for Transition of Responsibilities (Waste Management Conference 2006) PDF icon Process for Transition of Responsibilities More Documents & Publications FUSRAP Overview Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites Assessing and Implementing LTS&M Requirements for Remediation Sites Under the FUSRAP Program

  14. DOE - Office of Legacy Management -- Falls City Mill Site - TX 04

    Office of Legacy Management (LM)

    Mill Site - TX 04 FUSRAP Considered Sites Site: Falls City Mill Site (TX.04 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Falls City, Texas, Disposal Site Documents Related to Falls City Mill Site Data Validation Package for the April 2009 Groundwater Sampling at the Falls City, Texas, Disposal Site. June 2009 2014 Annual Site

  15. DOE - Office of Legacy Management -- Maybell Mill Site - CO 0-07

    Office of Legacy Management (LM)

    Maybell Mill Site - CO 0-07 FUSRAP Considered Sites Site: Maybell Mill Site (CO.0-07) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Maybell, Colorado, Disposal Site Documents Related to Maybell Mill Site 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Maybell,

  16. DOE - Office of Legacy Management -- Mexican Hat Mill Site - UT 0-02A

    Office of Legacy Management (LM)

    Mill Site - UT 0-02A FUSRAP Considered Sites Site: Mexican Hat Mill Site (UT.0-02A) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Mexican Hat, Utah, Disposal Site Documents Related to Mexican Hat Mill Site 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Mexican

  17. DOE - Office of Legacy Management -- Project Gas Buggy Site - NM 14

    Office of Legacy Management (LM)

    Gas Buggy Site - NM 14 FUSRAP Considered Sites Site: Project Gas Buggy Site (NM.14 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Gasbuggy, New Mexico, Site Nevada Test Site History Documents Related to Project Gas Buggy Site Fact Sheet Gasbuggy, New Mexico The Gasbuggy Site is located in northwestern New Mexico in Rio Arriba County

  18. DOE - Office of Legacy Management -- Rifle Mill Site - CO 0-11

    Office of Legacy Management (LM)

    Rifle Mill Site - CO 0-11 FUSRAP Considered Sites Site: Rifle Mill Site (CO.0-11 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Rifle, Colorado, New Processing Site Rifle, Colorado, Old Processing Site Documents Related to Rifle Mill Site 2009 Verification Monitoring Report for the Old and New Rifle, Colorado, Processing Sites;

  19. DOE - Office of Legacy Management -- Spook Site - WY 0-01

    Office of Legacy Management (LM)

    Spook Site - WY 0-01 FUSRAP Considered Sites Site: Spook Site (WY.0-01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Documents Related to Spook Site 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Spook, Wyoming, Disposal Site. LMS/S12245. March 2015 U.S.

  20. DOE - Office of Legacy Management -- St Louis Airport Site Vicinity

    Office of Legacy Management (LM)

    Properties - 017 St Louis Airport Site Vicinity Properties - 017 FUSRAP Considered Sites Site: St. Louis Airport Site Vicinity Properties (017) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: These properties are located in Hazelwood and Berkeley, Missouri, approximately 15 miles northwest of downtown St. Louis. The properties are

  1. Portsmouth Remediation Scope | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Remediation Scope Portsmouth Remediation Scope The Environmental Restoration Program was established by DOE in 1989 to identify, control, and remediate environmental contamination at the Portsmouth Site. The overall environmental cleanup strategy at Portsmouth is based on taking near-term actions to control or eliminate ongoing sources of contamination along with continued investigation of other potential sources. DOE works with regulators to further define project sequencing while optimizing

  2. DOE - Office of Legacy Management -- Gunnison Mill Site - CO 0-06

    Office of Legacy Management (LM)

    Gunnison Mill Site - CO 0-06 FUSRAP Considered Sites Site: Gunnison Mill Site (CO.0-06 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Gunnison, Colorado, Processing Site Documents Related to Gunnison Mill Site Baseline Risk Assessment of Groundwater Contamination at the Uranium Mill Tailings Site Near Gunnison, Colorado.

  3. DOE - Office of Legacy Management -- Naturita Mill Site - CO 0-08

    Office of Legacy Management (LM)

    Naturita Mill Site - CO 0-08 FUSRAP Considered Sites Site: Naturita Mill Site (CO.0-08) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Naturita, Colorado, Processing Site Documents Related to Naturita Mill Site Data Validation Package for the July and October 2008 Water Sampling at the Naturita Processing and Disposal Sites Data

  4. DOE - Office of Legacy Management -- Palos Park Forest Preserve Site (A

    Office of Legacy Management (LM)

    Plot M) - IL 04 Palos Park Forest Preserve Site (A Plot M) - IL 04 FUSRAP Considered Sites Site: Palos Park Forest Preserve Site (A/Plot M) (IL.04 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Site A/Plot M, Illinois, Decommissioned Reactor Site Documents Related to Palos Park Forest Preserve Site (A/Plot M) Surveillance of

  5. DOE - Office of Legacy Management -- Slick Rock Mill Site - CO 08

    Office of Legacy Management (LM)

    Slick Rock Mill Site - CO 08 FUSRAP Considered Sites Site: Slick Rock Mill Site (CO.08) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Slick Rock, Colorado, Processing Site Documents Related to Slick Rock Mill Site 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal

  6. DOE - Office of Legacy Management -- Tuba City Mill Site - AZ 0-02

    Office of Legacy Management (LM)

    Mill Site - AZ 0-02 FUSRAP Considered Sites Site: Tuba City Mill Site (AZ.0-02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Tuba City, Arizona, Disposal Site Documents Related to Tuba City Mill Site 2014 Navajo Nation Five-Year Plan 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act

  7. DOE - Office of Legacy Management -- Ambrosia Lake Mill Site - NM 0-01

    Office of Legacy Management (LM)

    Ambrosia Lake Mill Site - NM 0-01 FUSRAP Considered Sites Site: Ambrosia Lake Mill Site (NM.0-01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Ambrosia Lake Mill Site Documents Related to Ambrosia Lake Mill Site 2014 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal

  8. DOE - Office of Legacy Management -- Durango Mill Site - CO 0-05

    Office of Legacy Management (LM)

    Durango Mill Site - CO 0-05 FUSRAP Considered Sites Site: Durango Mill Site (CO.0-05 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Durango, Colorado, Processing Site Documents Related to Durango Mill Site 2005 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal

  9. Hazelwood Interim Storage Site annual site environmental report: Calendar year 1986

    SciTech Connect (OSTI)

    Not Available

    1987-06-01

    During 1986, the environmental monitoring program was continued at the Hazelwood Interim Storage Site (HISS), a US Department of Energy (DOE) facility located in the City of Hazelwood, Missouri. Originally known as the Cotter Corporation site on Latty Avenue in Hazelwood, the HISS is presently used for the storage of soils contaminated with residual radioactive material. As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action and environmental monitoring program are being conducted at the site and at vicinity properties by Bechtel National, Inc., Project Management Contractor for FUSRAP. The monitoring program at the HISS measures radon gas concentrations in air; external gamma radiation levels; and uranium, radium, and thorium concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard (100 mrem/yr) and assess its potential effect on public health, the radiation dose was calculated for the maximally exposed individual. Based on the scenario described in this report, the maximally exposed individual at the HISS would receive an annual external exposure approximately equivalent to 2% of the DOE radiation protection standard of 100 mrem/yr. This exposure is less than the exposure a person would receive during a round-trip flight from New York to Los Angeles. The cumulative dose to the population within an 80-km (50-mi) radius of the HISS that would result from radioactive materials present at the site would be indistinguishable from the dose that the same population would receive from naturally occurring radioactive sources. Results of the 1986 monitoring show that the HISS is in compliance with the DOE radiation protection standard. 11 refs., 6 figs., 10 tabs.

  10. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    SciTech Connect (OSTI)

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  11. Toxic Remediation System And Method

    DOE Patents [OSTI]

    Matthews, Stephen M. (Alameda County, CA); Schonberg, Russell G. (Santa Clara County, CA); Fadness, David R. (Santa Clara County, CA)

    1996-07-23

    What is disclosed is a novel toxic waste remediation system designed to provide on-site destruction of a wide variety of hazardous organic volatile hydrocarbons, including but not limited to halogenated and aromatic hydrocarbons in the vapor phase. This invention utilizes a detoxification plenum and radiation treatment which transforms hazardous organic compounds into non-hazardous substances.

  12. POST-REMEDIAL ACTION REPORT

    Office of Legacy Management (LM)

    POST-REMEDIAL ACTION REPORT . FORTHE C. H. SCHNOOR SITE SPRINGDALE, PENNSYLVANIA SEPTEMBER 1995 Prepared for United States' Department of Energy Oak Ridge Operations Office Under Contract No. DE-ACQ5-910R2 1949 Gchtel National, 1nc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . r FIGURES iv . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

  13. DOE - Office of Legacy Management -- Green River Mill Site - UT 0-01

    Office of Legacy Management (LM)

    Green River Mill Site - UT 0-01 FUSRAP Considered Sites Site: Green River Mill Site (UT.0-01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Green River, Utah, Disposal Site Documents Related to Green River Mill Site Data Validation Package for the June 2009 Groundwater and Surface Water Sampling at the Green River, Utah, Disposal

  14. DOE - Office of Legacy Management -- Monument Valley Mill Site - AZ 0-01

    Office of Legacy Management (LM)

    Monument Valley Mill Site - AZ 0-01 FUSRAP Considered Sites Site: Monument Valley Mill Site (AZ.0-01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Monument Valley, Arizona, Processing Site Documents Related to Monument Valley Mill Site Data Validation Package for the June 2009 Water Sampling at the Monument Valley, Arizona,

  15. DOE - Office of Legacy Management -- Central Nevada Test Site - NV 02

    Office of Legacy Management (LM)

    Central Nevada Test Site - NV 02 FUSRAP Considered Sites Site: Central Nevada Test Site (NV.02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Central Nevada Test Area (CNTA), Nevada, Site Documents Related to Central Nevada Test Site Public Involvement Plan Post-Closure Inspection and Monitoring Report for Corrective Action Unit

  16. Interstate Technology & Regulatory Council (ITRC) Remediation...

    Office of Environmental Management (EM)

    Council (ITRC) Remediation Management of Complex Sites: Case Studies and Guidance Hope Lee Pacific Northwest National Laboratory December 17, 2014 To view all the P&RA CoP...

  17. Paducah Environmental Remediation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Remediation Paducah Environmental Remediation Featured Project Video: Demolition work Completed at the C-410 Feed Plant Facility at the Paducah Site Since 1990, DOE has invested $1.9 billion dollars in successful site cleanup More than 60 years of uranium enrichment operations and support activities generated hazardous, radioactive, mixed (both hazardous and radioactive), and non-chemical (sanitary) waste. Past operations also resulted in soil, groundwater, and surface water contamination.

  18. Attenuation-Based Remedies in the Subsurface Applied Field Research

    Energy Savers [EERE]

    Initiative (ABRS AFRI) | Department of Energy Attenuation-Based Remedies in the Subsurface Applied Field Research Initiative (ABRS AFRI) Attenuation-Based Remedies in the Subsurface Applied Field Research Initiative (ABRS AFRI) Attenuation-Based Remedies in the Subsurface Applied Field Research Initiative (ABRS AFRI) Located at the Savannah River Site in Aiken, South Carolina, the Attenuation-Based Remedies in the Subsurface Applied Field Research Initiative (ABRS AFRI) was established to

  19. Utah Division of Environmental Response and Remediation Underground...

    Open Energy Info (EERE)

    Environmental Response and Remediation Underground Storage Tank Branch Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Utah Division of...

  20. DOE - Office of Legacy Management -- Naval Oil Shale Reserves Site - 013

    Office of Legacy Management (LM)

    Oil Shale Reserves Site - 013 FUSRAP Considered Sites Site: Naval Oil Shale Reserves Site (013 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is located in Anvil Points, Colorado. From the early 1940's through the early 1980's, the U.S. Department of Energy (DOE) conducted oil shale retort experiments in the Green River geologic

  1. REAL TIME DATA FOR REMEDIATION ACTIVITIES [11505

    SciTech Connect (OSTI)

    BROCK CT

    2011-01-13

    Health physicists from the CH2M HILL Plateau Remediation Company collaborated with Berkeley Nucleonics Corporation to modify the SAM 940 isotope identifier instrument to be used for nuclear waste remediation. These modifications coupled with existing capabilities of the SAM 940 have proven to be invaluable during remediation activities, reducing disposal costs by allowing swift remediation of targeted areas that have been identified as having isotopes of concern (IOC), and eliminating multiple visits to sites by declaring an excavation site clear of IOCs before demobilizing from the site. These advantages are enabled by accumulating spectral data for specific isotopes that is nearly 100 percent free of false positives, which are filtered out in 'real time.'

  2. Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 2, Appendices: Final environmental impact statement

    SciTech Connect (OSTI)

    1986-12-01

    This volume contains Appendix F--hydrology report, and Appendix G--flood plain and wetland assessment. Contents of the hydrology report include: surface water; ground water; potentially affected hydrogeologic environment-processing site; potentially affected hydrogeologic environment-Cheney reservoir site; potentially affected hydrogeologic environment-Two Road site; and conclusions-ground water.

  3. Sacandaga Site

    Office of Legacy Management (LM)

    Sacandaga Site Certification tp2ket KAPL-4804 :; Post Remedial Action Report for the Sacqndaga Site Property :. in Glenville, New York August 1994 Prepared for UNITED STATES DEPARTMENT OF ENERGY Schenectady Naval Reactors Office By: Knolls Atomic Power Laboratory Schenectady, New York CONTENTS iz%me List of Pigureki. .'iic:-9"- List ' of .Tables -.. 1.0 Introduction 2.0 Remedial Action Guidelines " i rtid.-Cu..i.- 3.0 Remedial Action 4.0" Post-R&edial Action Sampling 5.0

  4. 25 Years Of Environmental Remediation In The General Separations Area Of The Savannah River Site: Lessons Learned About What Worked And What Did Not Work In Soil And Groundwater Cleanup

    SciTech Connect (OSTI)

    Blount, Gerald; Thibault, Jeffrey; Millings, Margaret; Prater, Phil

    2015-03-16

    The Savannah River Site (SRS) is owned and administered by the US Department of Energy (DOE). SRS covers an area of approximately 900 square kilometers. The General Separation Area (GSA) is located roughly in the center of the SRS and includes: radioactive material chemical separations facilities, radioactive waste tank farms, a variety of radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the GSA from the mid-1950s through the mid-1990s. Radioactive operations at the F Canyon began in 1954; radioactive operations at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground (ORWBG) began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility (MWMF) and Low Level Radioactive Waste Disposal Facility (LLRWDF) received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970s, 1980s, and 1990s led to changes in waste management and environmental cleanup practices at SRS. The US Congress passed the Clean Air Act in 1970, and the Clean Water Act in 1972; the Resource Conservation and Recovery Act (RCRA) was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act (CERCLA) was enacted by Congress in 1980; the Federal Facilities Compliance Act (FFCA) was signed into law in 1992. Environmental remediation at the SRS essentially began with a 1987 Settlement Agreement between the SRS and the State of South Carolina (under the South Carolina Department of Health and Environmental Control - SCDHEC), which recognized linkage between many SRS waste management facilities and RCRA. The SRS manages several of the larger groundwater remedial activities under RCRA for facilities recognized early on as environmental problems. All subsequent environmental remediation projects tend to be managed under tri-party agreement (DOE, Environmental Protection Agency, and SCDHEC) through the Federal Facilities Agreement. During 25 years of environmental remediation SRS has stabilized and capped seepage basins, and consolidated and capped waste units and burial grounds in the GSA. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Over the last 25 years concentrations of contaminants in the aquifers beneath the GSA and in surface water streams in the GSA have dropped significantly. Closure of 65 waste sites and 4 RCRA facilities has been successfully accomplished. Wastes have been successfully isolated in place beneath a variety of caps and cover systems. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. SRS operated two very large pump and treat systems at the F and H Seepage Basins to attempt to limit the release of tritium to Fourmile Branch, a tributary of the Savannah River. The systems were designed to extract contaminated acidic groundwater, remove all contamination except tritium (not possible to remove the tritium from the water), and inject the tritiated groundwater up-gradient of the source area and the plume. The concept was to increase the travel time of the injected water for radioactive decay of the tritium. The two systems were found to be non-effective and potentially mobilizing more contamination. SRS in

  5. Uranium Mill Tailings Remedial Action Program. Annual status report

    SciTech Connect (OSTI)

    Not Available

    1983-12-01

    The FY 1983 project accomplishments are: completed the Remedial Action Plan and Phase I engineering design for the Canonsburg processing site; completed remedial action on an additional 52 vicinity properties and the inclusion of an additional 303 properties in the Uranium Mill Tailings Remedial Action Project; executed cooperative agreements with four states and the Navajo Nation; published the draft environmental impact statement for Salt Lake City site; and issued the approved Project Plan.

  6. In Situ Remediation Integrated Program: Technology summary

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The In Situ Remediation Integrated Program (ISR IP) was instituted out of recognition that in situ remediation could fulfill three important criteria: significant cost reduction of cleanup by eliminating or minimizing excavation, transportation, and disposal of wastes; reduced health impacts on workers and the public by minimizing exposure to wastes during excavation and processing; and remediation of inaccessible sites, including: deep subsurfaces, in, under, and around buildings. Buried waste, contaminated soils and groundwater, and containerized wastes are all candidates for in situ remediation. Contaminants include radioactive wastes, volatile and non-volatile organics, heavy metals, nitrates, and explosive materials. The ISR IP intends to facilitate development of in situ remediation technologies for hazardous, radioactive, and mixed wastes in soils, groundwater, and storage tanks. Near-term focus is on containment of the wastes, with treatment receiving greater effort in future years. ISR IP is an applied research and development program broadly addressing known DOE environmental restoration needs. Analysis of a sample of 334 representative sites by the Office of Environmental Restoration has shown how many sites are amenable to in situ remediation: containment--243 sites; manipulation--244 sites; bioremediation--154 sites; and physical/chemical methods--236 sites. This needs assessment is focused on near-term restoration problems (FY93--FY99). Many other remediations will be required in the next century. The major focus of the ISR EP is on the long term development of permanent solutions to these problems. Current needs for interim actions to protect human health and the environment are also being addressed.

  7. Environmental surveillance results for 1995 for the Hazelwood Interim Storage Site

    SciTech Connect (OSTI)

    McCague, J.C.

    1996-06-01

    This memorandum presents and interprets analytical results and measurements obtained as part of the 1995 environmental surveillance program for the Hazelwood Interim Storage Site (HISS) under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The discussion provides a comparative analysis of average historical background conditions and applicable regulatory criteria to the 1995 results reported for external gamma radiation and for samples from the media investigated (air, surface water, sediment, groundwater, and stormwater). Results from the 1995 environmental surveillance program at HISS indicate that, with the exception of thorium-230 in streambed sediment, applicable US Department of Energy (DOE) guidelines were not exceeded for any measured parameter or for any dose calculated for potentially exposed members of the general public. In the absence of sediment guidelines, DOE soil guidelines serve as a standard of comparison for data obtained from stream bed sediment; two samples from downstream locations contained concentrations of thorium-230 that exceeded DOE soil guidelines. All stormwater sample results were in compliance with permit-specified limits. Other radioactive materials include radium 226 and natural uranium.

  8. Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Remediation PRC Soil and Groundwater Remediation PRC Soil and Groundwater Remediation PRC Soil and Groundwater Remediation PRC Soil and Groundwater Remediation PRC Soil and Groundwater Remediation PRC Soil and Groundwater Remediation PRC Soil and Groundwater Remediation PRC Soil and Groundwater Remediation PRC Soil and Groundwater Remediation PRC Soil and Groundwater Remediation PRC Soil and Groundwater Remediation PRC Soil and Groundwater Remediation PRC Soil and Groundwater Remediation PRC

  9. Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity

    Broader source: Energy.gov [DOE]

    College intern Spencer Isom recently began her second summer with Savannah River Remediation (SRR), and her fourth year at Savannah River Site (SRS), where she continues a 31-year family legacy on site.

  10. DOE - Office of Legacy Management -- Beverly MA Site - MA 04

    Office of Legacy Management (LM)

    Beverly MA Site - MA 04 FUSRAP Considered Sites Beverly, MA Alternate Name(s): Metal Hydrides, Inc. Ventron Corporation MA.04-1 Location: Congress Street, Beverly, Massachusetts MA.04-4 Historical Operations: Provided uranium metal production under contract with MED. Thorium and radium contamination occurred from non-MED operations. MA.04-6 Eligibility Determination: Eligible MA.04-1 Radiological Survey(s): Assessment Survey, Verification Survey MA.04-4 MA.04-7 Site Status: Certified-

  11. Independent Oversight Review, Hanford Site CH2M Hill Plateau...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CH2M Hill Plateau Remediation Company - November 2012 Independent Oversight Review, Hanford Site CH2M Hill Plateau Remediation Company - November 2012 November 2012 Review of the...

  12. SUSTAINABLE REMEDIATION SOFTWARE TOOL EXERCISE AND EVALUATION

    SciTech Connect (OSTI)

    Kohn, J.; Nichols, R.; Looney, B.

    2011-05-12

    The goal of this study was to examine two different software tools designed to account for the environmental impacts of remediation projects. Three case studies from the Savannah River Site (SRS) near Aiken, SC were used to exercise SiteWise (SW) and Sustainable Remediation Tool (SRT) by including both traditional and novel remediation techniques, contaminants, and contaminated media. This study combined retrospective analysis of implemented projects with prospective analysis of options that were not implemented. Input data were derived from engineering plans, project reports, and planning documents with a few factors supplied from calculations based on Life Cycle Assessment (LCA). Conclusions drawn from software output were generally consistent within a tool; both tools identified the same remediation options as the 'best' for a given site. Magnitudes of impacts varied between the two tools, and it was not always possible to identify the source of the disagreement. The tools differed in their quantitative approaches: SRT based impacts on specific contaminants, media, and site geometry and modeled contaminant removal. SW based impacts on processes and equipment instead of chemical modeling. While SW was able to handle greater variety in remediation scenarios, it did not include a measure of the effectiveness of the scenario.

  13. Preliminary Notice of Violation, Rocky Mountain Remediation Services- EA-97-04

    Broader source: Energy.gov [DOE]

    Preliminary Notice of Violation issued to Rocky Mountain Remediation Services related to a Radioactive Material Release during Trench Remediation at the Rocky Flats Environmental Technology Site, (EA-97-04)

  14. Environmental Cleanup and Remediation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Board Report Feature Stories What We Clean Up & Why TOP STORIES - highlights of our science, people, technologies close Environmental Remediation program completes legacy...

  15. Pinellas Remediation Agreement Summary

    Office of Environmental Management (EM)

    Legal Driver(s) CERCLA Atomic Energy Act of 1954, as amended Florida Air and Water Pollution Control Act Scope Summary Remediation of property adjacent to the former ...

  16. An Electronic Encyclopedia of Remedial Options

    Energy Science and Technology Software Center (OSTI)

    1992-10-01

    REOPT has been developed by Pacific Northwest Laboratory to provide information about remedial action technologies, including application and regulatory information for over 700 contaminants. REOPT is a user-friendly personal computer program and database that functions like an electronic encyclopedia, sorting and presenting information to quickly familiarize engineers and planners with available remediation technologies. The system will help users focus quickly on the remediation technologies most likely to be effective for a particular site and problem,more » and presents concise, easy-to-use information about those technologies, helping users identify the key factors and constraints to consider in evaluating the use of each technology. REOPT contains information on approximately 90 established (i.e., proven) remediation technologies that could potentially be used for DOE waste-site cleanup. REOPT also contains auxiliary information about hazardous and radioactive contaminants and the federal regulations that govern their disposal. REOPT contains data for approximately 90 remedial action technologies, divided into categories according to the portion of a remedial action (i.e., containment, treatment, disposal, etc.) that they relate to or perform. Technologies are also classified according to the contaminants to which they may be applied. Contaminants may be selected from a list of approximately 700 in ten organic and four inorganic categories. The information for each technology is organized into the broad categories of descriptive information, application information, and additional information sources; these are then subdivided to allow the user to access more specific information about the technology.« less

  17. Remedial action planning for Trench 1

    SciTech Connect (OSTI)

    Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J.; Greengard, T.

    1998-07-01

    The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site.

  18. Voluntary Protection Program Onsite Review, Savannah River Remediation,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Llc, Liquid Waste Contract, Savannah River Site - November 2014 | Department of Energy Savannah River Remediation, Llc, Liquid Waste Contract, Savannah River Site - November 2014 Voluntary Protection Program Onsite Review, Savannah River Remediation, Llc, Liquid Waste Contract, Savannah River Site - November 2014 November 2014 Recertification of SRR as a Star Participant in the Department of Energy Voluntary Protection Program. This report summarizes the results from the evaluation of

  19. DOE - Office of Legacy Management -- Berkeley CA Site - CA 03

    Office of Legacy Management (LM)

    Berkeley CA Site - CA 03 FUSRAP Considered Sites Berkeley, CA Alternate Name(s): University of California Gilman Hall, University of California CA.03-1 Location: Gilman Hall, University of California, Berkeley, California CA.03-1 Historical Operations: Performed research and development on the synthesis and production of plutonium, resulting in uranium, plutonium, cesium and americium contamination. CA.03-3 CA.03-5 Eligibility Determination: Eligible CA.03-1 CA.03-2 Radiological Survey(s):

  20. Notification of Transfer of the Bliss and Laughlin, New York, FUSRAP Site to DOE for Long-Term Stewardship

    Office of Legacy Management (LM)

  1. Remedial action plan and site design for stabilization of the inactive Uranium Mill Tailing site Maybell, Colorado. Attachment 3, ground water hydrology report, Attachment 4, water resources protection strategy. Final report

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    The U.S. Environmental Protection Agency (EPA) has established health and environmental regulations to correct and prevent ground water contamination resulting from former uranium processing activities at inactive uranium processing sites (40 CFR Part 192 (1993)) (52 FR 36000 (1978)). According to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC {section} 7901 et seq.), the U.S. Department of Energy (DOE) is responsible for assessing the inactive uranium processing sites. The DOE has decided that each assessment will include information on hydrogeologic site characterization. The water resources protection strategy that describes the proposed action compliance with the EPA ground water protection standards is presented in Attachment 4, Water Resources Protection Strategy. Site characterization activities discussed in this section include the following: (1) Definition of the hydrogeologic characteristics of the environment, including hydrostratigraphy, aquifer parameters, areas of aquifer recharge and discharge, potentiometric surfaces, and ground water velocities. (2) Definition of background ground water quality and comparison with proposed EPA ground water protection standards. (3) Evaluation of the physical and chemical characteristics of the contaminant source and/or residual radioactive materials. (4) Definition of existing ground water contamination by comparison with the EPA ground water protection standards. (5) Description of the geochemical processes that affect the migration of the source contaminants at the processing site. (6) Description of water resource use, including availability, current and future use and value, and alternate water supplies.

  2. Supplemental feasibility study for remedial action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1999-08-06

    Site data evaluated indicate that after source removal, dilution and dispersion appear to be the primary processes that would further attenuate groundwater contaminant concentrations. On the basis of these attenuation processes, the calculations presented in Chapter 2 indicate that it would take several years to decades (approximately 60 to 150 and 14 years, respectively, for Zones 1 and 2) for TCE concentrations in Zones 1 and 2 to attenuate to the MCL (or ARAR) of 5 pg/L. The estimates for Zones 1 through 3, where the higher nitrate concentrations are clustered, indicate that it would likely take at least 80 years for nitrate concentrations to attenuate to the MCL (or ARAR) of 10 mg/L. Costs for implementing NINA for groundwater at the chemical plant area are primarily associated with those incurred for monitoring contaminant concentrations and the replacement costs for monitoring wells. Cost estimates are relatively high because a rather lengthy period of monitoring would be involved. Calculations performed to evaluate the feasibility of groundwater removal and subsequent treatment of the extracted water included determinations for the number of extraction wells needed, required number of pore volumes, and the number of years of implementation required to attain bench marks. The calculations were performed per zone of contamination, as discussed in Chapter 1. Several observations can be made about the results presented in Chapter 3 regarding Alternative 4. The first is that by looking at the results for Zones 1 and 2 evaluated under Alternative 4, one can also assess the feasibility of Alternative 7, because Alternative 7 addresses this particular subset of Alternative 4 (i.e., Zones 1 and 2). TCE contamination has been observed in Zones 1 and 2, but has not been reported in any of the remaining five zones. Nitrate, nitroaromatic compounds, and uranium have also been reported in Zones 1 and 2. The present-worth costs for implementing the pump and treat alternative in Zones 1 and 2 constitute the major component of the overall present-worth cost for Alternative 4, which indicates that the cost for Alternative 7 would be similarly high. Another observation is that although estimated times are shorter for the pump and treat approach than those for MNA, pump and treat for Zones 1 and 2 likely would take several decades (at least 30 years) to attain ARARs or bench marks. The cost estimates (in present-worth costs) for Alternatives 4 and 7 are much higher (approximately an order of magnitude higher) than those for Alternative 3.

  3. Preliminary Notice of Violation, Rocky Mountain Remediation Services...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    related to a Radioactive Material Release during Trench Remediation at the Rocky Flats Environmental Technology Site, (EA-97-04) On June 6, 1997, the U.S. Department of Energy...

  4. Lasagna{trademark} soil remediation

    SciTech Connect (OSTI)

    1996-04-01

    Lasagna{trademark} is an integrated, in situ remediation technology being developed which remediates soils and soil pore water contaminated with soluble organic compounds. Lasagna{trademark} is especially suited to sites with low permeability soils where electroosmosis can move water faster and more uniformly than hydraulic methods, with very low power consumption. The process uses electrokinetics to move contaminants in soil pore water into treatment zones where the contaminants can be captured and decomposed. Initial focus is on trichloroethylene (TCE), a major contaminant at many DOE and industrial sites. Both vertical and horizontal configurations have been conceptualized, but fieldwork to date is more advanced for the vertical configuration. Major features of the technology are electrodes energized by direct current, which causes water and soluble contaminants to move into or through the treatment layers and also heats the soil; treatment zones containing reagents that decompose the soluble organic contaminants or adsorb contaminants for immobilization or subsequent removal and disposal; and a water management system that recycles the water that accumulates at the cathode (high pH) back to the anode (low pH) for acid-base neutralization. Alternatively, electrode polarity can be reversed periodically to reverse electroosmotic flow and neutralize pH.

  5. Memorandum of Understanding | Department of Energy

    Office of Environmental Management (EM)

    Memorandum of Understanding Memorandum of Understanding Memorandum of Understanding (March 1999) PDF icon Memorandum of Understanding More Documents & Publications FUSRAP Memorandum of Understanding FUSRAP Memorandum of Understanding Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers

  6. 2010sr31_box-remediation.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Thursday, November 18, 2010 james-r.giusti@srs.gov Paivi Nettamo, SRNS, (803) 292-2484 paivi.nettamo@srs.gov SRS Recovery Act TRU Waste Project Ahead of Schedule with Box Remediation Program Aiken, SC - The U.S. Department of Energy's Savannah River Site (SRS) started off the last 12 months of the American Recovery and Reinvestment Act with an enormous success in its legacy transuranic (TRU) waste program. The H-Canyon box remediation program has not only met, but beat, its deadline for

  7. Innovative vitrification for soil remediation

    SciTech Connect (OSTI)

    Jetta, N.W.; Patten, J.S.; Hart, J.G.

    1995-12-01

    The objective of this DOE demonstration program is to validate the performance and operation of the Vortec Cyclone Melting System (CMS{trademark}) for the processing of LLW contaminated soils found at DOE sites. This DOE vitrification demonstration project has successfully progressed through the first two phases. Phase 1 consisted of pilot scale testing with surrogate wastes and the conceptual design of a process plant operating at a generic DOE site. The objective of Phase 2, which is scheduled to be completed the end of FY 95, is to develop a definitive process plant design for the treatment of wastes at a specific DOE facility. During Phase 2, a site specific design was developed for the processing of LLW soils and muds containing TSCA organics and RCRA metal contaminants. Phase 3 will consist of a full scale demonstration at the DOE gaseous diffusion plant located in Paducah, KY. Several DOE sites were evaluated for potential application of the technology. Paducah was selected for the demonstration program because of their urgent waste remediation needs as well as their strong management and cost sharing financial support for the project. During Phase 2, the basic nitrification process design was modified to meet the specific needs of the new waste streams available at Paducah. The system design developed for Paducah has significantly enhanced the processing capabilities of the Vortec vitrification process. The overall system design now includes the capability to shred entire drums and drum packs containing mud, concrete, plastics and PCB`s as well as bulk waste materials. This enhanced processing capability will substantially expand the total DOE waste remediation applications of the technology.

  8. Considered Sites Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Considered Sites Overview Considered Sites Overview View Considered Sites View Other Sites DOE maintains the Considered Sites Database to provide information to the public about sites that were formerly used in the nation's nuclear weapons and early atomic energy programs and that had the potential for residual radioactive contamination on site. Formerly Utilized Sites Remedial Action Program The U.S. Atomic Energy Commission (AEC) established the Formerly Utilized Sites Remedial Action Program

  9. NE-23 Disposal of Offsite-Generated Defense Radioactive Waste...

    Office of Legacy Management (LM)

    piL +3 *3L 52. NE-23 Disposal of Offsite-Generated Defense Radioactive Waste, Ventron FUSRAP Site Jill E. Lytle, DP-12 NE-23 The Office of Remedial Action and Waste Technology has...

  10. DESCRIPTION OF MODELING ANALYSES IN SUPPORT OF THE 200-ZP-1 REMEDIAL DESIGN/REMEDIAL ACTION

    SciTech Connect (OSTI)

    VONGARGEN BH

    2009-11-03

    The Feasibility Study/or the 200-ZP-1 Groundwater Operable Unit (DOE/RL-2007-28) and the Proposed Plan/or Remediation of the 200-ZP-1 Groundwater Operable Unit (DOE/RL-2007-33) describe the use of groundwater pump-and-treat technology for the 200-ZP-1 Groundwater Operable Unit (OU) as part of an expanded groundwater remedy. During fiscal year 2008 (FY08), a groundwater flow and contaminant transport (flow and transport) model was developed to support remedy design decisions at the 200-ZP-1 OU. This model was developed because the size and influence of the proposed 200-ZP-1 groundwater pump-and-treat remedy will have a larger areal extent than the current interim remedy, and modeling is required to provide estimates of influent concentrations and contaminant mass removal rates to support the design of the aboveground treatment train. The 200 West Area Pre-Conceptual Design/or Final Extraction/Injection Well Network: Modeling Analyses (DOE/RL-2008-56) documents the development of the first version of the MODFLOW/MT3DMS model of the Hanford Site's Central Plateau, as well as the initial application of that model to simulate a potential well field for the 200-ZP-1 remedy (considering only the contaminants carbon tetrachloride and technetium-99). This document focuses on the use of the flow and transport model to identify suitable extraction and injection well locations as part of the 200 West Area 200-ZP-1 Pump-and-Treat Remedial Design/Remedial Action Work Plan (DOEIRL-2008-78). Currently, the model has been developed to the extent necessary to provide approximate results and to lay a foundation for the design basis concentrations that are required in support of the remedial design/remediation action (RD/RA) work plan. The discussion in this document includes the following: (1) Assignment of flow and transport parameters for the model; (2) Definition of initial conditions for the transport model for each simulated contaminant of concern (COC) (i.e., carbon tetrachloride, technetium-99, iodine-129, nitrate [as NO{sub 3}], trichloroethene [TCE], total chromium, tritium), plus uranium; (3) Assumptions underlying the predictive simulations, including the phased implementation of the final full remedy; (4) Approximate number, locations, and rates of extraction and injection wells; and (5) Predicted amounts of contaminant mass extracted and influent concentrations at individual extraction wells for each COC and for uranium. This document is a companion report to pre-conceptual design document (DOE/RL-2008-56). Together these documents describe the sequential, progressive development of the modeling analyses and design basis for the 200-ZP-1 OU remedy.

  11. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM

    Office of Legacy Management (LM)

  12. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM

    Office of Legacy Management (LM)

  13. Integration of biotechnology in remediation and pollution prevention activities

    SciTech Connect (OSTI)

    Strong-Gunderson, J.M.

    1996-02-01

    The North American Free Trade Agreement/North American Agreement on Environmental Cooperation provides a mechanism for an international collaboration between the US, Canada, and Mexico to jointly develop, modify, or refine technologies that remediate or protect the environment. These countries have a vested interest in this type of collaboration because contaminants do not respect the boundaries of a manufacturing site, region, city, state, or country. The Environmental Sciences Division (ESD) at Oak Ridge National Laboratory (ORNL) consists of a diverse group of individuals who address a variety of environmental issues. ESD is involved in basic and applied research on the fate, transport, and remediation of contaminants; environmental assessment; environmental engineering; and demonstrations of advanced remediation technologies. The remediation and protection of the environment includes water, air, and soils for organic, inorganic, and radioactive contaminants. In addition to remediating contaminated sites, research also focuses on life-cycle analyses of industrial processes and the production of green technologies. The author focuses this discussion on subsurface remediation and pollution prevention; however, the research activities encompass water, soil and air and many of the technologies are applicable to all environments. The discussion focuses on the integration of biotechnology with remediation activities and subsequently linking these biological processes to other remediation technologies.

  14. ICDF Complex Remedial Action Work Plan

    SciTech Connect (OSTI)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  15. DOE - Office of Legacy Management -- Latty Avenue Site - MO 04

    Office of Legacy Management (LM)

    Latty Avenue Site - MO 04 FUSRAP Considered Sites Latty Avenue Site, MO Alternate Name(s): Futura Coatings Futura Chemical Company Facility Hazelwood Interim Storage Site (HISS) Former Cotter Site, Latty Avenue Properties Contemporary Metals Corp. Continental Mining and Milling MO.04-1 MO.04-2 MO.04-5 MO.04-6 MO.06-8 MO.06-11 Location: 9200 Latty Avenue, Hazelwood, Missouri MO.04-1 Historical Operations: Received, stored, and processed uranium residues for the AEC. Storage and processing were

  16. Mr. Glen Sjoblom Deputy Director

    Office of Legacy Management (LM)

    Safeguards. U. S. Nuclear Regulatory Comrii~~ibn .' Washington, D.C. 20555 Dear Mr. Sjoblom: Y As a part of its Formerly Utilized Sites Remedial Action Program (FUSRAP), the U. S. Department of Energy (DOE) is trying to identify all sites and facilities where radioactive materials were handled, processed or used in support of Manhattan Engineer. District (MED) and Atomic Energy Commission (AEC) activities from 1942 through the mid-1960's. ,The authority to conduct remed~ial action under FUSRAP,

  17. Innovative vitrification for soil remediation

    SciTech Connect (OSTI)

    Jetta, N.W.; Patten, J.S.; Hnat, J.G. [Vortec Corp., Collegeville, PA (United States)] [and others

    1996-03-01

    The objective of this DOE demonstration program is to validate the performance and operation of the Vortec Cyclone Melting System (CMS{trademark}) for the processing of LLW contaminated soils found at DOE sites. This DOE vitrification demonstration project has successfully progressed through the first two phases. Phase 1 consisted of pilot scale testing with surrogate wastes and the conceptual design of a process plant operating at a generic DOE site. The objective of Phase 2, which is scheduled to be completed the end of FY 95, is to develop a definitive process plant design for the treatment of wastes at a specific DOE facility. During Phase 2, a site specific design was developed for the processing of LLW soils and muds containing TSCA organics and RCRA metal contaminants. Phase 3 will consist of a full scale demonstration at the DOE gaseous diffusion plant located in Paducah, KY. Several DOE sites were evaluated for potential application of the technology. Paducah was selected for the demonstration program because of their urgent waste remediation needs as well as their strong management and cost sharing financial support for the project.

  18. Innovative vitrification for soil remediation

    SciTech Connect (OSTI)

    Jetta, N.W.; Patten, J.S.; Hnat, J.G. [Vortec Corp., Collegeville, PA (United States)

    1995-10-01

    The objective of this DOE demonstration program is to validate the performance and operation of the Vortec Cyclone Melting System (CMS{trademark}) for the processing of LLW contaminated soils found at DOE sites. This DOE vitrification demonstration project has successfully progressed through the first two phases. Phase I consisted of pilot scale testing with surrogate wastes and the conceptual design of a process plant operating at a generic DOE site. The objective of Phase 2, which is scheduled to be completed the end of FY 95, is to develop a definitive process plant design for the treatment of wastes at a specific DOE facility. During Phase 2, a site specific design was developed for the processing of LLW soils and muds containing TSCA organics and RCRA metal contaminants. Phase 3 will consist of a full scale demonstration at the DOE gaseous diffusion plant located in Paducah, KY. Several DOE sites were evaluated for potential application of the technology. Paducah was selected for the demonstration program because of their urgent waste remediation needs as well as their strong management and cost sharing financial support for the project.

  19. Engineering evaluation/cost analysis-environmental assessment for the proposed decontamination of properties in the vicinity of the Hazelwood Interim Storage Site, Hazelwood, Missouri

    SciTech Connect (OSTI)

    Picel, M.H.; Peterson, J.M. . Environmental Assessment and Information Sciences Div.); Williams, M.J. )

    1992-03-01

    The US Department of Energy (DOE), under its Formerly Utilized Sites Remedial Action Program (FUSRAP), is implementing a cleanup program for three groups of properties in the St. Louis, Missouri, area. None of the properties is owned by DOE, but each property contains radioactive residues from federal uranium-processing activities conducted at the SLDS during and after World War II. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support the interim cleanup measures for the contaminated properties in the Hazelwood and Berkeley, Missouri area. The near-term cleanup measures that may be necessary at the vicinity properties are evaluated in the main body of this report. Because of the range of active land uses in the Hazelwood and Berkeley areas and because of the extent of contamination on public and private properties, the potential exists for disturbance and spreading of soil contamination. Specifically, implementation of the proposed action would allow DOE to remove, transport, and safely store contaminated soils from properties where other activities (not involving DOE) are likely to result in either spreading contamination or otherwise complicating ultimate cleanup measures.

  20. Engineering evaluation/cost analysis for the proposed decontamination of properties in the vicinity of the Hazelwood Interim Storage Site, Hazelwood, Missouri -- environment assessment

    SciTech Connect (OSTI)

    Picel, M.H.; Peterson, J.M. . Environmental Assessment and Information Sciences Div.); Williams, M.J. )

    1991-05-01

    The US Department of Energy (DOE), under its Formerly Utilized Sites Remedial Action Program (FUSRAP), is implementing a cleanup program for three groups of properties in the St. Louis, Missouri, area. None of the properties is owned by DOE, but each property contains radioactive residues from federal uranium-processing activities conducted at the SLDS during and after World War II. This engineering evaluation/cost analysis (EE/CA) report has been prepared to support the interim cleanup measures for the contaminated properties in the Hazelwood and Berkeley, Missouri area. The near-term cleanup measures that may be necessary at the vicinity properties are evaluated in the main body of this report. Because of the range of active land uses in the Hazelwood and Berkeley areas and because of the extent of contamination on public and private properties, the potential exists for disturbance and spreading of soil contamination. Specifically, implementation of the proposed action would allow DOE to remove, transport, and safely store contaminated soils from properties where other activities (not involving DOE) are likely to result in either spreading contamination or otherwise complicating ultimate cleanup measures. 25 refs., 4 figs., 6 tabs.