1

ICDF Complex Remedial Action Work Plan  

SciTech Connect

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

2

Remedial action work plan for the Colonie site. Revision 1  

SciTech Connect

The Colonie site is a DOE Formerly Utilized Sites Remedial Action Program (FUSRAP) site located in the Town of Colonie, New York, and consisting of an interim storage site and several vicinity properties. The Colonie Interim Storage Site (CISS) is the former National Lead (NL) Industries plant located at 1130 Central Avenue. There are 11 vicinity properties that received remedial action in 1984: 7 located south of the site on Yardboro and Palmer Avenues just across the Colonie-Albany town limits in Albany, and 4 located northwest of the site along Central Avenue in Colonie. Of these properties, nine are residences and two are commercial properties. This document describes the engineering design, construction, and associated plans for remedial action on the vicinity properties and the interim storage site. These plans include both radiological and chemical work. Radiological work includes: excavating the above-guideline radioactive wastes on the vicinity properties; designing required facilities for the interim storage site; preparing the interim storage site to receive these contaminated materials; transporting the contaminated materials to the interim waste storage stockpile; and preparing necessary schedules for accomplishing the remedial actions. Chemical work involves: developing the Resource Conservation and Recovery Act (RCRA) closure plans; neutralizing chemical hazards associated with plating solutions; inventorying on-site chemicals; and disposal of chemicals and/or residues. 17 refs., 5 figs., 1 tab.

Not Available

1985-08-01T23:59:59.000Z

3

NE-24 Unlverslty of Chicayo Remedial Action Plan  

Office of Legacy Management (LM)

(YJ 4 tlsj .?I2 (YJ 4 tlsj .?I2 416 17 1983 NE-24 Unlverslty of Chicayo Remedial Action Plan 22&d 7 IA +-- E. I.. Keller, Director Technical Services Division Oak Ridge Operations Ufflce In response to your memorandum dated July 29, 1983, the Field Task Proposal/Agreement (FTP/A) received frw Aryonne National Laboratory (ANL) appears to be satisfactory, and this office concurs in the use of ANL to provide the decontamination effort as noted in the FTP/A. The final decontaminatton report should Include the data needed for certiff- cation of the cleanup and any contamination left In place, e.g., sewer lines should be so documented in the permanent records of the University as well as the certification documents and reports. The remedial action to be conducted appears to be clearly InsIgnifIcant from an environmental

4

Remedial Action Work Plan Amchitka Island Mud Pit Closures  

SciTech Connect

This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

DOE/NV

2001-04-05T23:59:59.000Z

5

Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Remedial Design/Remedial Action Work Plan  

SciTech Connect

This Remedial Design/Remedial Action Work Plan provides the framework for defining the remedial design requirements, preparing the design documentation, and defining the remedial actions for Waste Area Group 3, Operable Unit 3-13, Group 3, Other Surface Soils, Remediation Sets 4-6 (Phase II) located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory. This plan details the design developed to support the remediation and disposal activities selected in the Final Operable Unit 3-13, Record of Decision.

D. E. Shanklin

2006-06-01T23:59:59.000Z

6

New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect

This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

Nelson, L. O.

2007-06-12T23:59:59.000Z

7

New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect

This remedial action work plan identifies the approach and requirements for implementing the medical zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Engineering and Environmental Laboratory (INEEL). This plan details management approach for the construction and operation of the New Pump and Treat Facility. As identified in the remedial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action. This work plan was originally prepared as an early implementation of the final Phase C remediation. At that time, The Phase C implementation strategy was to use this document as the overall Phase C Work Plan and was to be revised to include the remedial actions for the other remedial zones (hotspot and distal zones). After the completion of Record of Decision Amendment: Technical Support Facility Injection Well (TSF-05) and Surrounding Groundwater Contamination (TSF-23) and Miscellaneous No Action Sites, Final Remedial Action, it was determined that each remedial zone would have it own stand-alone remedial action work plan. Revision 1 of this document converts this document to a stand-alone remedial action plan specific to the implementation of the New Pump and Treat Facility used for plume remediation within the medical zone of the OU 1-07B contaminated plume.

D. Vandel

2003-09-01T23:59:59.000Z

8

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III  

SciTech Connect

The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

R. P. Wells

2006-09-19T23:59:59.000Z

9

Uranium mill tailings remedial action project real estate management plan  

SciTech Connect

This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

Not Available

1994-09-01T23:59:59.000Z

10

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV  

SciTech Connect

This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

R. P. Wells

2006-11-14T23:59:59.000Z

11

ICDF Complex Remedial Action Report  

SciTech Connect

This Idaho CERCLA Disposal Facility (ICDF) Remedial Action Report has been prepared in accordance with the requirements of Section 6.2 of the INEEL CERCLA Disposal Facility Remedial Action Work Plan. The agency prefinal inspection of the ICDF Staging, Storage, Sizing, and Treatment Facility (SSSTF) was completed in June of 2005. Accordingly, this report has been developed to describe the construction activities completed at the ICDF along with a description of any modifications to the design originally approved for the facility. In addition, this report provides a summary of the major documents prepared for the design and construction of the ICDF, a discussion of relevant requirements and remedial action objectives, the total costs associated with the development and operation of the facility to date, and identification of necessary changes to the Agency-approved INEEL CERCLA Disposal Facility Remedial Action Work Plan and the ICDF Complex Operations and Maintenance Plan.

W. M. Heileson

2007-09-26T23:59:59.000Z

12

Work Plan for the Feasibility Study for Remedial Action at J-Field, Aberdeen Proving Ground, Maryland  

SciTech Connect

The purpose of the feasibility study is to gather sufficient information to develop and evaluate alternative remedial actions to address contamination at J-Field in compliance with the NCP, CERCLA, and SARA. This FS Work Plan summarizes existing environmental data for each AOC and outlines the tasks to be performed to evaluate and select remedial technologies. The tasks to be performed will include (1) developing remedial action objectives and identifying response actions to meet these objectives; (2) identifying and screening remedial action technologies on the basis of effectiveness, implementability, and cost; (3) assembling technologies into comprehensive alternatives for J-Field; (4) evaluating, in detail, each alternative against the nine EPA evaluation criteria and comparing the alternatives to identify their respective strengths and weaknesses; and (5) selecting the preferred alternative for each operable unit.

Benioff, P.; Biang, C.; Haffenden, R.; Goyette, M.; Martino, L.; Patton, T.; Yuen, C.

1995-05-01T23:59:59.000Z

13

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report: Attachment 2, Geology report, Final  

SciTech Connect

The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd{sup 3}) (2.1 million cubic meters [m{sup 3}]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd{sup 3} (15,000 m{sup 3}) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd{sup 3} (420,000 m{sup 3}). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd{sup 3} (2.58 million m{sup 3}). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations.

Not Available

1994-06-01T23:59:59.000Z

14

Mitigation action plan for remedial action at the Uranium Mill Tailing Sites and Disposal Site, Rifle, Colorado  

SciTech Connect

The Estes Gulch disposal site is approximately 10 kilometers (6 miles) north of the town of Rifle, off State Highway 13 on Federal land administered by the Bureau of Land Management. The Department of Energy (DOE) will transport the residual radioactive materials (RRM) by truck to the Estes Gulch disposal site via State Highway 13 and place it in a partially below-grade disposal cell. The RRM will be covered by an earthen radon barrier, frost protection layers, and a rock erosion protection layer. A toe ditch and other features will also be constructed to control erosion at the disposal site. After removal of the RRM and disposal at the Estes Gulch site, the disturbed areas at all three sites will be backfilled with clean soils, contoured to facilitate surface drainage, and revegetated. Wetlands areas destroyed at the former Rifle processing sites will be compensated for by the incorporation of now wetlands into the revegetation plan at the New Rifle site. The UMTRA Project Office, supported by the Remedial Action Contractor (RAC) and the Technical Assistance Contractor (TAC), oversees the implementation of the MAP. The RAC executes mitigation measures in the field. The TAC provides monitoring of the mitigation actions in cases where mitigation measures are associated with design features. Site closeout and inspection compliance will be documented in the site completion report.

Not Available

1992-07-01T23:59:59.000Z

15

Remedial Action Performed  

Office of Legacy Management (LM)

General Motors Site in General Motors Site in Adrian, Michigan Department of Energy OiZce of Assistant Manager for Environmental Management Oak Ridge Operations January 2001 69 Printed on recycledhcydable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE GENERAL MOTORS SITE ADRIAN, MICHIGAN JANUARY 200 1 Prepared for United States Army Corps of Engineers Under Contract No. DACW45-98-D-0028 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS FIGURES .............................................................................................................................................. TABLES ...............................................................................................................................................

16

Remedial Action Performed  

Office of Legacy Management (LM)

Baker and Williams Baker and Williams Warehouses Site in New York, New York, 7997 - 7993 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 7 995 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE BAKER AND WILLIAMS WAREHOUSES SITE IN NEW YORK, NEW YORK, 1991-1993 NOVEMBER 1995 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC05-910R21949 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 __ CONTENTS .- ~_- _- ..- ^_ FIGURES . ...,.,.....,,........,,.,_.....,.,.,.__,....,,,,, v TABLES ,.,__...,,....,..._._..,,,,_._...,.,.,,.,,,..._,,,, vi ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..v~

17

Remedial Action Performed  

Office of Legacy Management (LM)

' ' at the C. H. Schnoor Site, Springdale, Pennsylvania, in 1 994 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE C. H. SCHNOOR SITE SPRINGDALE, PENNSYLVANIA, IN 1994 NOVEMBER 1996 prep&ed for United States Department of ~nergy Oak Ridge Operations Off= r Under Contract No. DE-AC05-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. '14501 CONTENTS FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi UNITS OF MEASURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii

18

Remedial Action Performed  

Office of Legacy Management (LM)

Alba Craft Laboratory and Alba Craft Laboratory and Vicinity Properties Site in Oxford, Ohio C Department of Energy Former Sites Restoration Division Oak Ridge Operations Office January 1997 $$@T Op% 3 @!B . i~d!l Ab Printed on recycled/recyclable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE FORMER ALBA CRAFT LABORATORY AND VICINITY PROPERTIES SITE IN OXFORD, OHIO JANUARY 1997 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC0591 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES .............................................................................................................................................. v TABLES.. .............................................................................................................................................. vi

19

Remedial Action Performed  

Office of Legacy Management (LM)

Aliquippa Forge Site Aliquippa Forge Site in Aliquippa, Pennsylvania Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKE.~ FOR THE REMEDIAL ACTION PERFORMED AT THE ALIQUIPPA FORGE SITE IN ALIQUIPPA, PENNSYLVANIA NOVEMBER 1996 Prepared for . UNITED STATES DEPARTMENT OF ENERGY Oak Ridge Operations Office Under Contract No. DE-AC05-9 1 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES v . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TABLES vii . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii UNITSOFMEASURE ix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . INTRODUCTION xi . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

20

Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado: Final report  

SciTech Connect

This volume contains Appendix F, bid schedule and specifications for remedial action on three sites: Old Rifle processing site; New Rifle processing site and Estes Gulch disposal site.

Not Available

1992-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Mexican Hat, Utah: Appendix E. Final report  

SciTech Connect

This document provides Appendix E of the Remedial Action Plan (RAP) presented in 1988 for the stabilization of the inactive uranium mill tailings at the Mexican Hat, Utah site. The RAP was developed to serve a two- fold purpose. It presents the activities proposed by the Department of Energy (DOE) to accomplish long-term stabilization and control of the residual radioactive materials (RRM) from Monument Valley, Arizona, and Mexican Hat, Utah, at the Mexican Hat disposal site. It also serves to document the concurrence of both the Navajo Nation and the Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the Navajo Nation and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement. The RAP has been structured to provide a comprehensive understanding of the remedial action proposed for the Monument Valley and Mexican Hat sites. It includes specific design and construction requirements for the remedial action.

NONE

1988-07-01T23:59:59.000Z

22

DOE/EIS-0222 Revised Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land-Use Plan, April 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Draft Executive Summary Cover Sheet 1 2 3 Lead Federal Agency: U.S. Department of Energy (DOE) 4 5 Cooperating Agencies: U.S. Department of the Interior (Bureau of Land Management, 6 Bureau of Reclamation, and U.S. Fish and Wildlife Service); Benton, Franklin, and Grant 7 counties; and the City of Richland 8 9 Consulting Tribal Governments: Nez Perce Tribe Department of Environmental Restoration 10 and Waste Management and the Confederated Tribes of the Umatilla Indian Reservation 11 12 Title: Revised Draft Hanford Remedial Action Environmental Impact Statement and 13 Comprehensive Land-Use Plan (HRA-EIS), Hanford Site, Richland, Washington 14 15 Contacts: For further information on this EIS call or contact: 16 17 Thomas W. Ferns, HRA-EIS Document Manager 18 U.S. Department of Energy, Richland Operations Office

23

Agencies plan continued DOE landfill remediation  

NLE Websites -- All DOE Office Websites (Extended Search)

Agencies plan continued DOE landfill remediation Agencies plan continued DOE landfill remediation The U.S. Department of Energy (DOE), Idaho Department of Environmental Quality and U.S. Environmental Protection Agency have released a planning document that specifies how DOE will continue to remediate a landfill containing hazardous and transuranic waste at DOE's Idaho Site located in eastern Idaho. The Phase 1 Remedial Design/Remedial Action Work Plan for Operable Unit 7-13/14 document was issued after the September 2008 Record of Decision (ROD) and implements the retrieval of targeted waste at the Subsurface Disposal Area (SDA) within the Radioactive Waste Management Complex (RWMC). The SDA began receiving waste in 1952 and contains radioactive and chemical waste in approximately 35 acres of disposal pits, trenches and soil vaults.

24

Operable Unit 3-14, Tank Farm Soil and INTEC Groundwater Remedial Design/Remedial Action Scope of Work  

SciTech Connect

This Remedial Design/Remedial Action (RD/RA) Scope of Work pertains to OU 3-14 Idaho Nuclear Technology and Engineering Center and the Idaho National Laboratory and identifies the remediation strategy, project scope, schedule, and budget that implement the tank farm soil and groundwater remediation, in accordance with the May 2007 Record of Decision. Specifically, this RD/RA Scope of Work identifies and defines the remedial action approach and the plan for preparing the remedial design documents.

D. E. Shanklin

2007-07-25T23:59:59.000Z

25

Targeted Health Assessment for Wastes Contained at the Niagara Falls Storage Site to Guide Planning for Remedial Action Alternatives - 13428  

SciTech Connect

The U.S. Army Corps of Engineers (USACE) is evaluating potential remedial alternatives at the 191-acre Niagara Falls Storage Site (NFSS) in Lewiston, New York, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) brought radioactive wastes to the site during the 1940's and 1950's, and the U.S. Department of Energy (US DOE) consolidated these wastes into a 10-acre interim waste containment structure (IWCS) in the southwest portion of the site during the 1980's. The USACE is evaluating remedial alternatives for radioactive waste contained within the IWCS at the NFSS under the Feasibility Study phase of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process. A preliminary evaluation of the IWCS has been conducted to assess potential airborne releases associated with uncovered wastes, particularly during waste excavation, as well as direct exposures to uncovered wastes. Key technical issues for this assessment include: (1) limitations in waste characterization data; (2) representative receptors and exposure routes; (3) estimates of contaminant emissions at an early stage of the evaluation process; (4) consideration of candidate meteorological data and air dispersion modeling approaches; and (5) estimates of health effects from potential exposures to both radionuclides and chemicals that account for recent updates of exposure and toxicity factors. Results of this preliminary health risk assessment indicate if the wastes were uncovered and someone stayed at the IWCS for a number of days to weeks, substantial doses and serious health effects could be incurred. Current controls prevent such exposures, and the controls that would be applied to protect onsite workers during remedial action at the IWCS would also effectively protect the public nearby. This evaluation provides framing context for the upcoming development and detailed evaluation of remedial alternatives for the IWCS. (authors)

Busse, John; Keil, Karen; Staten, Jane; Miller, Neil; Barker, Michelle [U.S. Army Corps of Engineers, Buffalo District, 1776 Niagara Street, Buffalo, NY (United States)] [U.S. Army Corps of Engineers, Buffalo District, 1776 Niagara Street, Buffalo, NY (United States); MacDonell, Margaret; Peterson, John; Chang, Young-Soo; Durham, Lisa [Argonne National Laboratory, Environmental Science Division, 9700 S. Cass Ave., Argonne, IL 60439 (United States)] [Argonne National Laboratory, Environmental Science Division, 9700 S. Cass Ave., Argonne, IL 60439 (United States)

2013-07-01T23:59:59.000Z

26

Assessment of Remedial Actions for Contaminated Sites  

Science Journals Connector (OSTI)

During the investigation in the field of remedial actions on contaminated land, an appropriate concept ... site, an evaluation of the existing alternative remedial techniques is necessary. The comparative evaluat...

Th. Neteler; H. L. Jessberger

1993-01-01T23:59:59.000Z

27

Climate change action plan  

E-Print Network (OSTI)

Delivery Climate change action plan 2009-2011 #12;2 | Climate change action plan ©istockphoto.com #12;Climate Change Action Plan Climate change action plan | 3 Contents Overview 4 Preface and Introduction 5 Climate change predictions for Scotland 6 The role of forestry 7 Protecting and managing

28

NHMFL Emergency Action Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY SAFETY PROCEDURE SP-3 TITLE: EMERGENCY ACTION PLAN ...

29

Remediation plan for fluorescent light fixtures containing polychlorinated biphenyls (PCBs)  

SciTech Connect

This report describes the remedial action to achieve compliance with 29 CFR 1910 Occupational Safety and Health Administration (OSHA) requirements of fluorescent light fixtures containing PCBs at K-25 site. This remedial action is called the Remediation Plan for Fluorescent Light Fixtures Containing PCBs at the K-25 Site (The Plan). The Plan specifically discusses (1) conditions of non-compliance, (2) alternative solutions, (3) recommended solution, (4) remediation plan costs, (5) corrective action, (6) disposal of PCB waste, (7) training, and (8) plan conclusions. The results from inspections by Energy Systems personnel in 2 buildings at K-25 site and statistical extension of this data to 91 selected buildings at the K-25 site indicates that there are approximately 28,000 fluorescent light fixtures containing 47,036 ballasts. Approximately 38,531 contain PCBs and 2,799 of the 38,531 ballasts are leaking PCBs. Review of reportable occurrences at K-25 for the 12 month period of September 1990 through August 1991 shows that Energy Systems personnel reported 69 ballasts leaking PCBs. Each leaking ballast is in non-compliance with 29 CFR 1910 - Table Z-1-A. The age of the K-25 facilities indicate a continued and potential increase in ballasts leaking PCBs. This report considers 4 alternative solutions for dealing with the ballasts leaking PCBs. The advantages and disadvantages of each alternative solution are discussed and ranked using cost of remediation, reduction of health risks, and compliance with OSHA as criteria.

NONE

1992-04-30T23:59:59.000Z

30

Description of the Formerly Utilized Sites Remedial Action Program  

SciTech Connect

The background and the results to date of the Department of Energy program to identify and evaluate the radiological conditions at sites formerly utilized by the Corps of Engineers' Manhattan Engineer District (MED) and the US Atomic Energy Commission (AEC) are summarized. The sites of concern were federally, privately, and institutionally owned and were used primarily for research, processing, and storage of uranium and thorium ores, concentrates, or residues. Some sites were subsequently released for other purposes without radiological restriction. Surveys have been conducted since 1974 to document radiological conditions at such sites. Based on radiological surveys, sites are identified in this document that require, or are projected to require, remedial action to remove potential restrictions on the use of the property due to the presence of residual low-level radioactive contamination. Specific recommendations for each site will result from more detailed environmental and engineering surveys to be conducted at those sites and, if necessary, an environmental impact assessment or environmental impact statement will be prepared. Section 3.0 describes the current standards and guidelines now being used to conduct remedial actions. Current authority of the US Department of Energy (DOE) to proceed with remedial actions and the new authority required are summarized. A plan to implement the Formerly Utilized Sites Remedial Action Program (FUSRAP) in accordance with the new authority is presented, including the objectives, scope, general approach, and a summary schedule. Key issues affecting schedule and cost are discussed.

Not Available

1980-09-01T23:59:59.000Z

31

Definition: Corrective Action Plan | Open Energy Information  

Open Energy Info (EERE)

Corrective Action Plan Corrective Action Plan Jump to: navigation, search Dictionary.png Corrective Action Plan A list of actions and an associated timetable for implementation to remedy a specific problem.[1] View on Wikipedia Wikipedia Definition Corrective action and preventive action (CAPA, also called corrective action / preventive action) are improvements to an organization's processes taken to eliminate causes of non-conformities or other undesirable situations. CAPA is a concept within good manufacturing practice (GMP). It focuses on the systematic investigation of the root causes of non-conformities in an attempt to prevent their recurrence (for corrective action) or to prevent occurrence (for preventive action). Corrective actions are implemented in response to customer complaints,

32

SITE MAINTENANCE PLAN CSMRI SITE REMEDIATION  

E-Print Network (OSTI)

...............................................................................................................5 5.2 Ground and Surface Water MonitoringSITE MAINTENANCE PLAN CSMRI SITE REMEDIATION June 29, 2004 Prepared by: Colorado School of Mines .................................................................................................4 5.0 SITE AIR AND WATER MONITORING

33

SAMPLING AND ANALYSIS PLAN CSMRI SITE REMEDIATION  

E-Print Network (OSTI)

Littleton, CO 80127 #12;CSMRI Site Remediation Quality Assurance Project Plan March 30, 2004 SAMPLING Environmental Consultants, Inc. Approved By: Date: Sally Cuffin Project Quality Assurance Manager New Horizons...................................................................................................................................3 2.5 Decision Rules

34

Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography  

SciTech Connect

This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description.

Owen, P.T.; Michelson, D.C.; Knox, N.P.

1985-09-01T23:59:59.000Z

35

Recommendations for Remedial Action at Everest, Kansas.  

SciTech Connect

On September 7, 2005, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) presented a Scoping Memo (Argonne 2005) for preliminary consideration by the Kansas Department of Health and Environment (KDHE). This document suggested possible remedial options for the carbon tetrachloride contamination in groundwater at Everest, Kansas. The suggested approaches were discussed by representatives of the KDHE, the CCC/USDA, and Argonne at the KDHE office in Topeka on September 8-9, 2005, along with other technical and logistic issues related to the Everest site. In response to these discussions, the KDHE recommended (KDHE 2005) evaluation of several remedial processes, either alone or in combination, as part of a Corrective Action Study (CAS) for Everest. The primary remedial processes suggested by the KDHE included the following: (1) Hydraulic control by groundwater extraction with aboveground treatment; (2) Air sparging-soil vapor extraction (SVE) in large-diameter boreholes; and (3) Phytoremediation. As a further outcome of the 2005 meeting and as a precursor to the proposed CAS, the CCC/USDA completed the following supplemental investigations at Everest to address several specific technical concerns discussed with the KDHE: (1) Construction of interpretive cross sections at strategic locations selected by the KDHE along the main plume migration pathway, to depict the hydrogeologic characteristics affecting groundwater flow and contaminant movement (Argonne 2006a); (2) A field investigation in early 2006 (Argonne 2006c), as follows: (a) Installation and testing of a production well and associated observation points, at locations approved by the KDHE, to determine the response of the Everest aquifer to groundwater extraction near the Nigh property; (b) Groundwater sampling for the analysis of volatile organic compounds (VOCs) and the installation of additional permanent monitoring points at locations selected by the KDHE, to further constrain the existing contaminant plume; and (c) Resampling of all existing permanent monitoring points for VOCs and biodegradation parameter analyses, at the request of the KDHE. On the basis of these studies (Argonne 2006a,c) and the CCC/USDA's past investigations at Everest (Argonne 2006b), the CCC/USDA concluded that groundwater extraction is not an effective remedial option for this site, and the KDHE concurred (KDHE 2006). As outlined in the next section, the CCC/USDA also believes that air sparging does not represent a viable remedial alternative. The CCC/USDA therefore proposes to collect the technical data required to evaluate the potential viability of a phytoremediation approach for this site and, if appropriate, to support the development of a remedial design.

LaFreniere, L. M. (Environmental Science Division)

2007-02-15T23:59:59.000Z

36

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

DOE has determined that the contamination is not attirbutable to the AEC-sponsored operations. Therefore, DOE does not have legal authority to conduct remedial actions at...

37

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

DOW CHEMICAL COMPANY WALNUT CREEK, CALIFORNIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site...

38

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

RADIOLOGICAL HEALTH LABORATORY) WINCHESTER, MASSACHUSE'ITS Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and...

39

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and...

40

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

SYLVANIA-CORNING NUCLEAR CORPORATION BAYSIDE, NEW YORK VW. Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and...

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

COLUMBIA UNIVERSITY NEW YORK, NEW YORK Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning...

42

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

OF ARIZONA (U.S. BUREAU OF MINES) TUCSON, ARIZONA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and...

43

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

ELECTRIC CORPORATION BUILDING 7 BLOOMFIELD, NEW JERSEY SW 30 1985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of...

44

MITIGATION ACTION PLAN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MITIGATION ACTION PLAN MITIGATION ACTION PLAN KEMPER COUNTY IGCC PROJECT KEMPER COUNTY, MISSISSIPPI U.S. Department of Energy National Energy Technology Laboratory September 2010 2 INTRODUCTION The Department of Energy (DOE) issued a Final Environmental Impact Statement (EIS) for the Kemper County IGCC Project (Project) (DOE/EIS-0409) in May 2010 and a Record of Decision (ROD) in August 2010 (75 FR 51248). The ROD identified commitments to mitigate potential adverse impacts associated with the project. This Mitigation Action Plan (MAP) describes the monitoring and mitigation actions the recipient must implement during the design, construction, and demonstration of the Project. DOE prepared this MAP in accordance with 10 CFR § 1021.331. PURPOSE Section 1021.331 of the DOE regulations implementing NEPA (10 CFR Part 1021) provides

45

EIS-0472: Mitigation Action Plan  

Energy.gov (U.S. Department of Energy (DOE))

Uranium Leasing Program Mitigation Action Plan for the Final Uranium Leasing Program Programmatic Environmental Impact Statement

46

Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5  

SciTech Connect

This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.

Owen, P.T.; Knox, N.P.; Chilton, B.D.; Baldauf, M.F.

1984-09-01T23:59:59.000Z

47

EIS-0198: Uranium Mill Tailings Remedial Action Groundwater Project |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

198: Uranium Mill Tailings Remedial Action Groundwater Project 198: Uranium Mill Tailings Remedial Action Groundwater Project EIS-0198: Uranium Mill Tailings Remedial Action Groundwater Project SUMMARY This EIS assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 28, 1997 EIS-0198: Record of Decision Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project (April 1997) December 1, 1996 EIS-0198: Programmatic Environmental Impact Statement Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project

48

Implementation of the Formerly Utilized Sites Remedial Action Program:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation of the Formerly Utilized Sites Remedial Action Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers (Waste Management Conference 2010) Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers (Waste Management Conference 2010) More Documents & Publications Recent Developments in DOE FUSRAP

49

FORMERLY REMEDIAL UTILIZED SITES ACTION PROGRAM ELIMINATION REPORT ELIMINATION REPORT  

Office of Legacy Management (LM)

(' (' . . FORMERLY REMEDIAL UTILIZED SITES ACTION PROGRAM ELIMINATION REPORT ELIMINATION REPORT FORMER VITRO LABORATORIES FORMER VITRO LABORATORIES VITRO CORPORATION VITRO CORPORATION WEST ORANGE, NEW JERSEY WEST ORANGE, NEW JERSEY SEP 30 1985 SEP 30 1985 Department of Energy Office of Nuclear Waste Office of Remedial Action and Waste Technology Division of Facility and Site Deconxnissioning Projects . CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES iii Page 7 3 4 - _- mI _---. ELSMINATION REPORT FORMER VITRO LABORATORIES, VITRO CORPORATION, WEST ORAN6E, NEW JERSEY INTRODUCTION . The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site

50

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM . ELIMINATION REPORT FOR AL-TECH SPECIALTY STEEL CORPORATION (THE FORMER ALLEGHENY-LUDLUM STEEL CORPORATION) _ WATERYLIET, NEW YORK, AND DUNKIRK, NEW YORK SEP 301985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects ----- ----_l_.._- .._. _- CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES iii .- --- .- Page . 1 4 ELIMINATION REPORT AL-TECH SPECIALTY STEEL CORPORATION (THE FORMER ALLEGHENY-LUDLUM STEEL CORPORATION) WATERYLIET, NEW YORK, AND DUNKIRK, NEW YORK 1 INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office

51

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

I I c. ,..I -. i FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR BRIDGEPORT BRASS COMPANY HAVENS LABORATORY (REACTIVE METALS, INC.) KOSSUTH AND PULASKI STREETS BRIDGEPORT, CONNECTICUT i Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decomnissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 . 2 ii .-_. _.--_- "~ ELIMINATION REPORT FORMER BRIDGEPORT BRASS COMPANY HAVENS LABORATORY (REACTIVE METALS, INC. 1 KOSSUTH AND PULASKI STREETS BRIDGEPORT, CONNECTICUT INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and kaste Technology, Division of Facility and Site

52

Strategic Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Program Strategic Action Plan David McAndrew Background * Result of FUPWG Fall 2006 Meeting * Responds to challenge issued FEMP's Director * Based on the feedback from the FUPWG Fall working group session * Will require FUPWG member active participation for success FEMP Challenge * Accelerate project planning and implementation * Double current project investment levels * Double the number of utilities offering UESCs * Enhance the partnerships between utilities and agencies * Maximize the use, by agencies, of additional services offered by utilities to meet the government's goals for EERE Fall FUPWG Working Session Questions * How can we double the level of project investment from its current level

53

Mitigation Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

212 212 Mitigation Action Plan for the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory Departme~t of Energy Albuquerque Operations Office Los Alamos Area Office Los Alamos, New Mexico MITIGATION ACTION PLAN for the LEASE OF LAND FOR THE DEVELOPMENT OF A RESEARCH PARK AT LOS ALAMOS NATIONAL LABORATORY Background on the Lease of Land at Los Alamos National Laboratory: The U. S. Department of Energy (DOE) has approved an Environmental Assessment (EA) on the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory (LANL)(DOE/EA-1212), Los Alamos, New Mexico. The DOE released a Predecisional Draft of this EA for State and Tribal review and made the draft document available to the public on July 24, 1997 for

54

Workforce Diversity Action Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Workforce Diversity Action Plans Workforce Diversity Action Plans Workforce Diversity Office Best Practices Diversity Council Compendium of Diversity Activities Principles for a Diverse Community Lawrence Berkeley National Laboratory is principally an institution of scientific research, committed to addressing the needs of society. A diverse workforce is an invaluable asset to innovation and research excellence. To this end, we must embody the following principles to successfully affect the Laboratory's mission and embrace our diverse workplace community. We affirm the inherent dignity in all of us and strive to maintain an environment characterized by respect, fairness, and inclusion. Our valued community encompasses an array of races, creeds, and social circumstances. We recognize and cherish the richness contributed by our diversity.

55

SAVEnergy Action Plans  

SciTech Connect

The Department of Energy`s Federal Energy Management Program (FEMP) is charged with carrying out key sections of EPACT and Executive Order 12903, to make the Federal government operate more efficiently. A congressionally mandated energy and water conservation audit program is one component of this growing DOE program. This paper traces the SAVEnergy Action Plan program throughout its development from (1) identifying projects and Agency champions, (2) establishing a protocol and fitting auditors into the program, (3) developing a data base to track the audits and measure their success, and (4) evaluating the process, learning from mistakes, and charting and transferring successes. A major tenet of the SAVEnergy program is to proactively prescreen all audit activities to ensure that -- where audits are done and Action Plans completed -- projects will be done.

Mayo, K.; Westby, R. [National Renewable Energy Lab., Golden, CO (United States)] [National Renewable Energy Lab., Golden, CO (United States); deMonsabert, S. [George Mason Univ., Fairfax, VA (United States)] [George Mason Univ., Fairfax, VA (United States); Ginsberg, M. [USDOE, Washington, DC (United States)] [USDOE, Washington, DC (United States)

1994-04-01T23:59:59.000Z

56

Draft Final Remedial Investigation/Feasibility Study and Proposed Plan  

E-Print Network (OSTI)

Draft Final Remedial Investigation/Feasibility Study and Proposed Plan Colorado School of Mines, Colorado 80021 #12;The S.M. Stoller Corporation Flood Plain Remedial Investigation / Feasibility Study ..................................................................................................... 1-8 1.6 Previous Investigations

57

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR OCCIDENTAL CHEMICAL CORPORATION ( FORMER HOOKER ELECTROCHEMICAL COMPANY ) NIAGARA FALLS, NEW YORK SEP 30 1985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects ELIMINATION REPORT FOR OCCIDENTAL CHEMICAL CORPORATION (FORMER HOOKER ELECTROCHEMICAL COMPANY) L NIAGARA FALLS, NEW YORK- INTRODUCTION The Department ' of Energy (DDE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or the predecessor agencies, offices, and divisions), has reviewed the past activities of the Manhattan Engineer District (MED) and the Atomic Energy Commission (MED/AEC) at

58

Oak Ridge Associated Universities OF Preparedfor REMEDIAL ACTIONS  

Office of Legacy Management (LM)

-7 8,-7 C 7 I 2o.1-1o 1 ORAU 891-29 Prepared by VERIFICATION Oak Ridge Associated Universities OF Preparedfor REMEDIAL ACTIONS ecommissioning ALBANY RESEARCH CENTER...

59

Y-12 Plant remedial action Technology Logic Diagram: Volume 3, Technology evaluation data sheets: Part A, Remedial action  

SciTech Connect

The Y-12 Plant Remedial Action Technology Logic Diagram (TLD) was developed to provide a decision-support tool that relates environmental restoration (ER) problems at the Y-12 Plant to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration, testing, and evaluation needed for sufficient development of these technologies to allow for technology transfer and application to remedial action (RA) activities. The TLD consists of three volumes. Volume 1 contains an overview of the TLD, an explanation of the program-specific responsibilities, a review of identified technologies, and the rankings of remedial technologies. Volume 2 contains the logic linkages among environmental management goals, environmental problems and the various technologies that have the potential to solve these problems. Volume 3 contains the TLD data sheets. This report is Part A of Volume 3 and contains the Remedial Action section.

NONE

1994-09-01T23:59:59.000Z

60

Ecological effects of contaminants and remedial actions in Bear Creek  

SciTech Connect

Ecological studies of the Bear Creek watershed, which drains the area surrounding several Oak Ridge Y-12 Plant waste disposal facilities, were initiated in May 1984 and are continuing at present. These studies consisted of an initial, detailed characterization of the benthic invertebrate and fish communities in Bear Creek, and they were followed by a presently ongoing monitoring phase that involves reduced sampling intensities. The characterization phase utilized two approaches: (1) instream sampling of benthic invertebrate and fish communities in Bear Creek to identify spatial and temporal patterns in distribution and abundance and (2) laboratory bioassays on water samples from Bear Creek and selected tributaries to identify potential sources of toxicity to biota. The monitoring phase of the ecological program relates to the long-term goals of identifying and prioritizing contaminant sources and assessing the effectiveness of remedial actions. It continues activities of the characterization phase at less frequent intervals. The Bear Greek Valley is a watershed that drains the area surrounding several closed Oak Ridge Y-12 Plant waste disposal facilities. Past waste disposal practices in Bear Creek Valley resulted in contamination of Bear Creek and consequent ecological damage. Extensive remedial actions have been proposed at waste sites, and some of the have been implemented or are now underway. The proposed study plan consists of an initial, detailed characterization of the benthic invertebrate and fish communities in Bear Creek in the first year followed by a reduction in sampling intensity during the monitoring phase of the plan. The results of sampling conducted from May 1984 through early 1989 are presented in this report.

Southworth, G.R.; Loar, J.M.; Ryon, M.G.; Smith, J.G.; Stewart, A.J. [Oak Ridge National Lab., TN (United States); Burris, J.A. [C. E. Environmental, Inc., Tallahassee, FL (United States)

1992-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Tank waste remediation system engineering plan  

SciTech Connect

This Engineering Plan describes the engineering process and controls that will be in place to support the Technical Baseline definition and manage its evolution and implementation to the field operations. This plan provides the vision for the engineering required to support the retrieval and disposal mission through Phase 1 and 2, which includes integrated data management of the Technical Baseline. Further, this plan describes the approach for moving from the ``as is`` condition of engineering practice, systems, and facilities to the desired ``to be`` configuration. To make this transition, Tank Waste Remediation System (TWRS) Engineering will become a center of excellence for TWRS which,will perform engineering in the most effective manner to meet the mission. TWRS engineering will process deviations from sitewide systems if necessary to meet the mission most effectively.

Rifaey, S.H.

1998-01-09T23:59:59.000Z

62

A comparison of the RCRA Corrective Action and CERCLA Remedial Action Processes  

SciTech Connect

This document provides a comprehensive side-by-side comparison of the RCRA corrective action and the CERCLA remedial action processes. On the even-numbered pages a discussion of the RCRA corrective action process is presented and on the odd-numbered pages a comparative discussion of the CERCLA remedial action process can be found. Because the two programs have a difference structure, there is not always a direct correlation between the two throughout the document. This document serves as an informative reference for Departmental and contractor personnel responsible for oversight or implementation of RCRA corrective action and CERCLA remedial action activities at DOE environmental restoration sites.

Not Available

1994-02-01T23:59:59.000Z

63

Guam Energy Action Plan  

SciTech Connect

Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

64

Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites  

Energy.gov (U.S. Department of Energy (DOE))

Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites (Waste Management Conference 2008)

65

Action Plan UNIVERSITY OF MISSOURI  

E-Print Network (OSTI)

Energy, Energy Economics and Policy, and Energy-related Commercialization & Business Development. Other, transportation will play a larger role in its greenhouse gas profile. The Climate Action Plan recommends sustain- ability plan. While the initial Climate Action Plan focuses primarily on greenhouse gas emissions

Taylor, Jerry

66

Remedial design work plan for Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee  

SciTech Connect

The Remedial Design Work Plan (RDWP) for Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. This remedial action fits into the overall Oak Ridge Reservation (ORR) cleanup strategy by addressing contaminated floodplain soil. The objective of this remedial action is to minimize the risk to human health and the environment from contaminated soil in the Lower EFPC floodplain pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Federal Facility Agreement (FFA) (1992). In accordance with the FFA, a remedial investigation (RI) (DOE 1994a) and a feasibility study (DOE 1994b) were conducted to assess contamination of the Lower EFPC and propose remediation alternatives. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative by the feasibility study was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Following the remedial investigation/feasibility study, and also in accordance with the FFA, a proposed plan was prepared to more fully describe the proposed remedy.

NONE

1995-10-01T23:59:59.000Z

67

CLEMSON UNIVERSITY Sustainability Action Plan  

E-Print Network (OSTI)

.......................................................................... 8 Action Steps for Sustainability Education, Culture, and Leadership CLEMSON UNIVERSITY Sustainability Action Plan Submitted by the President's Commission on Sustainability, August 1, 2011 Version 1.0.9 #12; 1 Table of Contents President

Duchowski, Andrew T.

68

Remedial Action and Waste Disposal Conduct of OperationsMatrix  

SciTech Connect

This Conduct of Operations (CONOPS) matrix incorporates the Environmental Restoration Disposal Facility (ERDF) CONOPS matrix (BHI-00746, Rev. 0). The ERDF CONOPS matrix has been expanded to cover all aspects of the RAWD project. All remedial action and waste disposal (RAWD) operations, including waste remediation, transportation, and disposal at the ERDF consist of construction-type activities as opposed to nuclear power plant-like operations. In keeping with this distinction, the graded approach has been applied to the developmentof this matrix.

M. A. Casbon.

1999-05-24T23:59:59.000Z

69

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

itI.2 -2 itI.2 -2 FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR THE FORMER BRUSH BERYLLIUM COMPANY CLEVELAND, OHIO Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects __I__,_-. - ---.. ____- .- CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Pa e -5 2 2 2 4 4 4 ii ELIMINATION REPORT THE FORMER BRUSH BERYLLIUM COMPANY CLEVELAND, OHIO INTRODUCTION The Oepartment of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decorrnnissioning Projects (and/or predecessor agencies, offices and divisionsa has reviewed the past activities of the Manhattan Engineer

70

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

fi.q 2, fi.q 2, I: * FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT EAST PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects INTRODUCTION BACKGROUND CONTENTS Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 4 iii ELIMINATION REPORT WESTINGHOUSE ATOMIC POWER DEVELOPMENT PLANT EAST PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decormnissioning Projects (and/or predecessor agencies, offices and

71

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

-p,l-I -p,l-I . . FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR MOBIL MINING AND MINERALS COMPANY (THE FORMER MATHIESON CHEMICAL COMPANY) PASADENA, TEXAS D Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 2 2 2 3 3 4 ii --. ELIMINATION REPORT MOBIL MINING AND MINERALS COMPANY (THE FORMER MATHIESON CHEMICAL COMPANY) PASADENA, TEXAS INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor offices and divisions),

72

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

,: /A (,) i_ - z ,: /A (,) i_ - z FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR FORMERLY UTILIZED PORTIONS OF THE WATERTOWN ARSENAL WATERTOWN, MASSACHUSETTS Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decotwnissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Radiological History and Status ELIMINATION ANALYSIS Findings and Recommendation 6 REFERENCES iii Page 1 1 1 3 4 7 "..*.w..,, -. ._ ..- ". --. AUTHORITY REVIEW WATERTOWN ARSENAL WATERTOWN, MASSACHUSETTS INTRODUCTION The purpose of this review is to present information pertaining to work performed under the sponsorship of the Atomic Energy Commission (AEC) Manhattan Engineer District (MED) and the facts and circum-

73

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

SENECA ARMY DEPOT SENECA ARMY DEPOT ROMULUS, NEW YORK Department of Energy Office of Nuclear Energy Office of Remedial Action and kaste Technology. Division of Facility and Site Decommissioning Projects INTRODUCTION t3ACKGROUND CONTENTS . -Page Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES 1 4 ii .___ -_-_..--. ._.".. ELIMINATION REPORT SENECA ARMY DEPOT ROMULUS, NEW YORK . INTRODUCTION The Department pf Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices, and divisions) has reviewed the past activities of the Manhattan Engineer District (MED) at Seneca Army Depot, Romulus, hew York. Based on the

74

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

\ \ ,.-c , 2 2 a. . FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM . ELIMINATION REPORT FOR THE FORMER GENERAL SERVICES ADMINISTRATION 39TH STREET WAREHOUSE 1716 PERSHING ROAD CHICAGO, ILLINOIS SEP301985 Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects __--... -_ -._.-_- _"_-. .___.. -... .._ ..-. .-. ..--- . , ' , CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES iii 4 __-.I ._-----.- --- ELIMINATION REPORT FOR THE FORMER GENERAL SERVICES ADMINISTRATION 39TH STREET WAREHOUSE 1716 PERSHING ROAD CHICAGO, ILLINOIS INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office

75

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

CF INDUSTRIES, INC. CF INDUSTRIES, INC. ( THE FORMER INTERNATIONAL MI NERALS AND CHEMICAL CORPORATION) BARTON, FLORIDA Department of Energy Office of Nuclear Energy. Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects - - .._. ..--.. . . I."__ . - INTRODUCTION CONTENTS Page BACKGROUND Site Function Site Description Radiological. History and Status ELIMINATION ANALYSIS REFERENCES Summary of Findings ii 7 8 --..I--- - ..-___-_--.___-"-- -- ' . ELIMINATION REPORT CF INDUSTRIES, INC. (THE FORMER INTERNATIONAL MINERALS AND CHEMICAL CORPORATION) BARTOW, FLORIDA INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices, and

76

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

ROHM & HAAS COMPANY ROHM & HAAS COMPANY PHILADELPHIA, PENNSYLYANIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects CONTENTS Page INTRODUCTIOk BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES 2 2 2 2 3 3 iii ELIMINATION REPORT ROHM & HAAS COMPANY PHILADELPHIA, PENNSYLVANXA INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor offices and divisions) has reviewed the past activities of the Atomic Energy Commission (AEC) at the Rohm & Haas Company, Philadelphia, Pennsylvania. Based on a

77

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

BETHLEHEM STEEL CORPORATION BETHLEHEM STEEL CORPORATION LACKAWANNA, NEW YORK Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects P bl@ C.' , 1 & cr INTRODUCTION BACKGROUND CONTENTS Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 5 iii ELIMINATION REPORT BETHLEHEM STEEL CORPORATION LACKAWANNA, NEW YORK INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices and divisions), has reviewed the past activities of the Atomic Energy Commission (AEC) at the Bethlehem Steel Corporation, Lackawanna, New

78

Designation of Sites for Remedial Action - Metal Hydrides, Beverly,  

Office of Legacy Management (LM)

T: T: Designation of Sites for Remedial Action - Metal Hydrides, Beverly, MA; Bridgeport Brass, Adrian, MI and Seymour, Chicago, IL CT; National Guard Armory, 0: Joe LaGrone, Manager Oak Ridge Operations Office Based on the attached radiological survey data (Attachments 1 through 3) and an appropriate authority review, the following properties are being authorized for remedial action. It should be noted that the attached survey data are for designation purposes only and that Bechtel National, Inc. (BNI) should conduct appropriate comprehensive characterization studies to determine the extent'and magnitude of contamination on properties. Site Location Priority Former Bridgeport Brass Co. (General Motors) Adrian, MI Low Former Bridgeport Brass Co.

79

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

UNIVERSITY OF ARIZONA UNIVERSITY OF ARIZONA (U.S. BUREAU OF MINES) TUCSON, ARIZONA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects -- --- .- _- --__ CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES ii - ,. -- Page 1 4 4 ..I___ - ~-___- ELIMINATION REPORT UNIVERSITY OF ARIZONA (U.S. BUREAU OF MINES) TUCSON, ARIZONA INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor offices and divisions) has reviewed the past activities of the Atomic Energy Commission (AEC)

80

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

NATIONAL BUREAU OF STANDARDS BUILDINGS NATIONAL BUREAU OF STANDARDS BUILDINGS VAN NESS STREET WASHINGTON, D.C. Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects - __-~---- -._.. .._ .-. .- INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status CONTENTS ELIMINATION ANALYSIS REFERENCES ii Paqe 1 4 INiRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices, and divisions) has reviewed the past activities conducted for the Atomic Energy Commission and the Manhattan Engineer District (MED) (DOE predecessors) at

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

BIOMASS ACTION PLAN FOR SCOTLAND  

E-Print Network (OSTI)

BIOMASS ACTION PLAN FOR SCOTLAND #12; #12;© Crown copyright 2007 ISBN: 978 0 7559 6506 9 Scottish% recyclable. #12;A BIOMASS ACTION PLAN FOR SCOTLAND #12;#12;1 CONTENTS FOREWORD 3 1. EXECUTIVE SUMMARY 5 2. INTRODUCTION 9 3. WIDER CONTEXT 13 4. SCOTLAND'S ROLE IN THE UK BIOMASS STRATEGY 17 5. BIOMASS HEATING 23 6

82

Access to Courts and Preemption of State Remedies in Collective Action Perspective  

E-Print Network (OSTI)

application of preemption doctrine to state judicial remedies. This article applies a collective action framework for preemption analysis to the issue of remedial preemption. Our analysis suggests that while remedial preemption may be justified in some...

Glicksman, Robert L.; Levy, Richard E.

2009-01-01T23:59:59.000Z

83

RCRA Information Brief, June 1996: Conditional remedies under RCRA correction action  

SciTech Connect

This document describes conditional remedies under RCRA corrective action. The definition of conditional remedies, criteria that must be met, applications to DOE facilities, applicable clean-up standards, and implementation of conditional remedies are discussed in the document.

NONE

1996-06-01T23:59:59.000Z

84

Part 2: Quality Assurance Project Plan Remedial Investigation, UMore East  

E-Print Network (OSTI)

Part 2: Quality Assurance Project Plan Remedial Investigation, UMore East Dakota County, Minnesota\\23191092 UMore 1948 Parcel Remedial Inv\\WorkFiles\\SAP\\Part 2-QAPP Umore East v2.1\\QAPP rev. 2.1.doc A2 Table\\19\\23191092 UMore 1948 Parcel Remedial Inv\\WorkFiles\\SAP\\Part 2-QAPP Umore East v2.1\\QAPP rev. 2

Netoff, Theoden

85

UCSF Sustainability Action Plan: Executive Summary  

E-Print Network (OSTI)

UCSF Sustainability Action Plan: Executive Summary Issue Date: April 21, 2011 #12;UCSF Sustainability Action Plan Executive Summary April 21, 2011 Page 1 Table of Contents An Introduction to the Sustainability Action Plan

Yamamoto, Keith

86

Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program  

Energy.gov (U.S. Department of Energy (DOE))

Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program (March 2012)

87

Cost of presumptive source term Remedial Actions Laboratory for energy-related health research, University of California, Davis  

SciTech Connect

A Remedial Investigation/Feasibility Study (RI/FS) is in progress at the Laboratory for Energy Related Health Research (LEHR) at the University of California, Davis. The purpose of the RI/FS is to gather sufficient information to support an informed risk management decision regarding the most appropriate remedial actions for impacted areas of the facility. In an effort to expedite remediation of the LEHR facility, the remedial project managers requested a more detailed evaluation of a selected set of remedial actions. In particular, they requested information on both characterization and remedial action costs. The US Department of Energy -- Oakland Office requested the assistance of the Pacific Northwest National Laboratory to prepare order-of-magnitude cost estimates for presumptive remedial actions being considered for the five source term operable units. The cost estimates presented in this report include characterization costs, capital costs, and annual operation and maintenance (O&M) costs. These cost estimates are intended to aid planning and direction of future environmental remediation efforts.

Last, G.V.; Bagaasen, L.M.; Josephson, G.B.; Lanigan, D.C.; Liikala, T.L.; Newcomer, D.R.; Pearson, A.W.; Teel, S.S.

1995-12-01T23:59:59.000Z

88

Work plan for the remedial investigation/feasibility study-environmental assessment for the Colonie site, Colonie, New York  

SciTech Connect

This work plan has been prepared to document the scoping and planning process performed by the US Department of Energy (DOE) to support remedial action activities at the Colonie site. The site is located in eastern New York State in the town of Colonie near the city of Albany. Remedial action of the Colonie site is being planned as part of DOE's Formerly Utilized Sites Remedial Action Program. The DOE is responsible for controlling the release of all radioactive and chemical contaminants from the site. Under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), a remedial investigation/feasibility study (RI/FS) must be prepared to support the decision-making process for evaluating remedial action alternatives. This work plan contains a summary of information known about the site as of January 1988, presents a conceptual site model that identifies potential routes of human exposure to site containments, identifies data gaps, and summarizes the process and proposed studies that will be used to fill the data gaps. In addition, DOE activities must be conducted in compliance with the National Environmental Policy Act (NEPA), which requires consideration of the environmental consequences of a proposed action as part of its decision-making process. This work also describes the approach that will be used to evaluate potential remedial action alternatives and includes a description of the organization, project controls, and task schedules that will be employed to fulfill the requirements of both CERCLA and NEPA. 48 refs., 18 figs., 25 tabs.

Not Available

1990-06-01T23:59:59.000Z

89

Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Waste Management Plan  

SciTech Connect

This Waste Management Plan describes waste management and waste minimization activities for Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory. The waste management activities described in this plan support the selected response action presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13. This plan identifies the waste streams that will be generated during implementation of the remedial action and presents plans for waste minimization, waste management strategies, and waste disposition.

G. L. Schwendiman

2006-07-01T23:59:59.000Z

90

Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program  

Energy.gov (U.S. Department of Energy (DOE))

Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program (March 2012)

91

SCOTTISH RED SQUIRREL ACTION PLAN  

E-Print Network (OSTI)

SCOTTISH RED SQUIRREL ACTION PLAN 2006­2011 #12;#12;S C O T T I S H R E D S Q U I R R E L A C T I O.1 Background 1 1.2 Action Plan Working Group 1 1.3 Issues affecting the conservation of the red squirrel 1 1.2 Timescale and partnership working 3 2.3 Rationale 3 2.4 Key actions 4 2.4.1 Establish and monitor the red

92

ENVIRONMENTAL ASSESSMENT OF No REMEDIAL ACTION AT THE INACTIVE URANIFEROUS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 206 7 206 REV. 0 ENVIRONMENTAL ASSESSMENT OF No REMEDIAL ACTION AT THE INACTIVE URANIFEROUS LIGNITE ASHING SITES AT BELFIELD AND BOWMAN. NORTH DAKOTA United States Department of Energy Uranium Mill Tailings Remedial Action Project June 1997 INTENDED FOR PUBLIC RELEASE This report has been reproduced from the best available copy. Available in paper copy and microfiche Number of pages in this report: 5 8 DOE and DOE contractors can obtain copies of this report from: Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831 (61 5) 576-8401 This report is publicly available from: National Technical Information Service Department of Commerce 5285 Port Royai Road Springfield, VA 22161 (703) 487-4650 DOE/EA-1206 REV. 0 ENVIRONMENTAL ASSESSMENT

93

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIkNATION REPORT  

Office of Legacy Management (LM)

ELIkNATION REPORT ELIkNATION REPORT .FOR WESTINGHOUSE .ATOMIC POWER DEVELOPMENT PLANT EAST PITTSBURGH PLANT FOREST HILLS PITTSBURGH, PENNSYLVANIA Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Deconrmissioning Projects l CONTENTS INTRODUCTICIN BACKGROUND. Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 2 2 2' 4 4 iii ELIMINATION~REPORT WESTINGHOUSE ATOMIC POWER,DEVELOPMENT,PLANT: EAST PITTSBURGH PLANT: 'FOREST HILLS ,PITTS.BURGH, PENNSYLVANIA INTRODUCTION The Department of,Energy (DOE), Office of Nuclear Energy, Office of 'Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices and

94

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM - ELIMINATION REPORT FOR  

Office of Legacy Management (LM)

- - ELIMINATION REPORT FOR . UNIVERSITY OF NEVADA MACKAY SCHOOL OF MINES RENO, NEVADA s,d k I",, ici ;3J(, i Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES 1 , Page . 1 2 2 2' 3 3 iii The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor offices and divisions) has reviewed the past activities conducted under contract to the Atomic Energy Conrmission (AEC) at the University of Nevada, Mackay

95

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

FORMER ALLIED CHEMICAL CORPORATION, CHEMICALS COMPANY FORMER ALLIED CHEMICAL CORPORATION, CHEMICALS COMPANY (NOW GENERAL CHEMICAL CORPORATION) NORTH CLAYMONT, DELAWARE Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioni.ng Projects " .___ . ..-. --.- ------ ". CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES Page 1 1 1 2 2 2 4 ii INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices, and divisions) has reviewed the past activities of the Manhattan Engineer -- District (MED) and the Atomic Energy Commission (AEC) at the Allied Chemical

96

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

AMOCO CHEMICAL COMPANY AMOCO CHEMICAL COMPANY (THE FORMER TEXAS CITY CHEMICALS, INC.) TEXAS CITY, TEXAS Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS Summary of Findings REFERENCES ii --.. ---_ .l.- _-__II__-_. -. Page 1 7 7 ' c . ELIMINATION REPORT AMOCO CHEMICAL COMPANY (THE FORMER TEXAS CITY CHEMICALS, INC.) TEXAS CITY, TEXAS INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor offices and divisions), has reviewed the past activities conducted on behalf of the Atomic

97

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

SYLVANIA-CORNING NUCLEAR CORPORATION SYLVANIA-CORNING NUCLEAR CORPORATION BAYSIDE, NEW YORK VW. Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects ..- .-- ---- CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES ii Page 1 L 2 2 3 3 5 5 - --__( -_..... _ .._ ELIMINATION REPORT THE FORMER SYLVANIA-CORNING NUCLEAR CORPORATION BAYSIDE, NEW YORK L -rc c INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices, and divisions) has reviewed the past activities of the Atomic Energy

98

Monticello Mill Tailings Site Operable Unit Ill Interim Remedial Action  

Office of Legacy Management (LM)

Site Site Operable Unit Ill Interim Remedial Action Mark Perfxmed Under DOE Contrici No. DE-AC13-96CJ873.35 for th3 U.S. De[:ar!menf of Energy app~oveJioi'ptiL#ic re1ease;dCinWlionis Unlimilra' This page intentionally left blank Monticello Mill Tailings Site Operable Unit I11 Interim Remedial Action Annual Status Report August 1999 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number MSG-035-0011-00-000 Document Number Q0017700 Work Performed Under DOE Contract Number DE-AC13-96GJ87335 Task Order Number MAC99-03 This page intentionally blank Document Number Q0017700 Acronyms Contents Page ACRONYMS .............................................................................................................................. V

99

Oak Ridge Operations Formerly Utilized Sites Remedial Action Program  

Office of Legacy Management (LM)

IC77GLg /'-Oi. SEP 20 1982 IC77GLg /'-Oi. SEP 20 1982 10-05-04B-001 Deportment of Energy Oak Ridge Operations Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 PRELIMINARY ENGINEERING EVALUATION OF REMEDIAL ACTION ALTERNATIVES BAYO CANYON SITE, LOS ALAMOS, NEW MEXICO SEPTEMBER 1982 Bechtel Job 14501 Bechtel National, Inc. Nuclear Fuel Operations LEGAL NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness or usefulness of any information, apparatus, product or process disclosed, or represents that its use

100

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT,  

Office of Legacy Management (LM)

REPORT, REPORT, FOR AL-TECH SPECIALTY STEEL CORPORATION (THE FORMER ALLEGHENY-LUDLUM STEEL CORPORATION) WATERVLIET, NEW YORK, AND DUNKIRK, NEW YORK Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste.Technology Division of Facility and Site Decommissioning Projects CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES * 1 2 2 2 3 4 4 . . . 111 ELIMINATION REPORT AL-TECH SPECIALTY STEEL CORPORATION (THE FORMER ALLEGHENY-LUDLUM STEEL CORPORATION) WATERVLIET. NEW YORK, AND DUNKIRK, NEW YORK INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices, and

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

FORMERLY REMEDIAL UTILIZED SITES ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

REMEDIAL UTILIZED SITES ACTION PROGRAM ELIMINATION REPORT FOR FORMER CARPENTER STEEL COMPANY; 101 WEST BERN STREET; READING, PENNSYLVANIA December 1991 U.S. Department of Energy Office of Environmental Restoration Elimination Report Former Carpenter Steel Company CONTENTS INTRODUCTION ........................... 1 BACKGROUND ............................ 1 Site Function ......................... Site Description. ....................... : Radiological History and Status ................ 2 ELIMINATION ANALYSIS ....................... 3 REFERENCES ............................ 4 Elimination Report Former Carpenter Steel Company INTRODUCTION The Department of Energy (DOE), Office of Environmental Restoration, has reviewed the past activities of the Manhattan Engineer District (MEO) and

102

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

< < .. ,:. FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT FOR JESSOP STEEL COMPANY; 500 GREEN STREET: WASHINGTON, PENNSYLVANIA December 1991 U.S. Department of Energy Office of Environmental Restoration Elimination Report Jessop Steel Company CONTENTS INTRODUCTION ...................... .'. .... 1 BACKGROUND ............................. 1 Site Function Site Description : : : : : : : .................................... : Radiological History and Status ................. 2 ELIMINATION ANALYSIS ........................ 3 REFERENCES .............................. 4 Elimination Report Jessop Steel Company 1 INTRODUCTION The Department of Energy (DOE)., Office of Environmental Restoration, has reviewed the past activities of the Manhattan Engineer District (MED) and

103

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

REMEDIAL ACTION PROGRAM ELIMINATION REPORT SONABOND ULTRASONICS FORMERLY AEROPROJECTS, INC. 200-T E. ROSEDALE AVENUE WEST CHESTER,~PENNSYLVANIA December 1991 U.S. Department of Energy Office of Environmental Restoration and Waste Management Office of Environmental Restoration Office of Eastern Area Programs . . . CONTENTS INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS . . . . . . . . . . . . . . . . . . . REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . m . . 1 . . 1 . . 2 . . 2 I . . ELIMINATIO N REPO R T SONABOND ULTRASONICS FORMERLY AEROPROJECTS, INC. 200-T E. ROSEDALE AVENUE W EST CHESTER, PENNSYLVANIA

104

FORMERLY UTILIZED elTEB REMEDIAL ACTION PROORAM [FUSRAP] AND  

Office of Legacy Management (LM)

bE8IQM CRITERIA FOR bE8IQM CRITERIA FOR r FORMERLY UTILIZED elTEB REMEDIAL ACTION PROORAM [FUSRAP] AND r 8URPLUS FACIL~TIES MANAOEMENT PROQRAM [SFMPI FEBRUARY 1886 i r s o i - o o - ~ c - o l - 1 ~ R e v . 1 DESIGN CRITERIA FOR FORMERLY UTILIZED Sf TES REMEDIAL' ACTION PROGAM ( PUSRAPL AND . . -- SURPLUS F A C I L I T I E S UANAGEMENT PROGRAM ( SFMP ( I S S U E D FOR CLIENT APPROVAL) SF proved by: 2-24-86 D a t e T e c h n i c a l Services D i v i s i o n A p p r o v e d by: 2-24-86 D a t e C o n s t r u c t i o n a n d E n g i n e e r i n g Oak R i d g e O p e r a t i o n s O f f ice 14SOl-00-PC-01 Rev. 1 PREFACE T O DESIGN CRITERIA These design criteria have been written in a generic form that sunmarizes criteria applicabl'e for remedial action and long-tern ranasenent activities associated with t h e radioactive wastes at the FOSRAP *and SFflP sites. Site-specific information i

105

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

WINCHESTER ENGINEERING AND ANALYTICAL CENTER WINCHESTER ENGINEERING AND ANALYTICAL CENTER (NORTHEASTERN RADIOLOGICAL HEALTH LABORATORY) WINCHESTER, MASSACHUSE'ITS Department of Energy Office of Nuclear Energy Office of Remedial Action and Waste Technology Division of Facility and Site Decommissioning Projects . . I . I C O N T E N T S IN T R O D U C T IO N B A C K G R O U N D S i te F u n c ti o n S i te D e s c ri p ti o n R a d i o l o g i c a l H i s to ry a n d S ta tu s E L IM IN A T IO N A N A L Y S IS R E F E R E N C E S - P a g e 1 2 2 2 3 5 5 i i i -..- - ELIMINATION REPORT WINCHESTER ENGINEERING AND ANALYTICAL CENTER (NORTHEASTERN RADIOLOGICAL HEALTH LABORATORY) WINCHESTER, MASSACHUSETTS INTRODUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Terminal Waste Disposal and Remedial Action, Division of Remedial Action Projects (and/or predecessor agencies, offices and divisions,)

106

Remedial action and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Attachment 2, Geology report  

SciTech Connect

This report presents geologic considerations that are pertinent to the Remedial Action Plan for Slick Rock mill tailings. Topics covered include regional geology, site geology, geologic stability, and geologic suitability.

Not Available

1993-07-01T23:59:59.000Z

107

Restoration 2013 ACTION PLAN  

E-Print Network (OSTI)

Study Taskforce, Lower Columbia Fish Recovery Board, Lower Columbia Estuary Partnership, National Marine are intended to guide or inform, as appropriate, the Actions Agencies (BPA/Corps), National Marine Fisheries was prepared by the BPA/Corps with review by and collaboration with regional restoration sponsors, researchers

108

Buried Waste Integrated Demonstration commercialization actions plans. Volume 1  

SciTech Connect

The Buried Waste Integrated Demonstration (BWID) is sponsored by US Department of Energy (DOE) Office of Technology Development. BWID supports the development and demonstration of a suite of technologies that when integrated with commercially available baseline technologies form a comprehensive system for the effective and efficient remediation of buried waste throughout the DOE complex. BWID evaluates, validates, and demonstrates technologies and transfers this information throughout DOE and private industry to support DOE. remediation planning and implementation activities. This report documents commercialization action plans for five technologies with near-term commercialization/ implementation potential as well as provides a status of commercial and academic partners for each technology.

Kaupanger, R.M. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Glore, D. [Advanced Sciences, Inc. (United States)

1994-04-01T23:59:59.000Z

109

A plan for action  

Science Journals Connector (OSTI)

......to see how the peer-review element to arrive at...Comprehensive Spending Review and try to reverse some...should fol- low up our review, published jointly with...can improve this. I plan to start with a personal...microchannel plate camera, a standard technique in X-ray......

Michael Rowan Robinson

2006-10-01T23:59:59.000Z

110

Application of groundwater modeling in remedial action development  

Science Journals Connector (OSTI)

The development and implementation of a remedial program usually is a costly process. Available scientific and engineering data should be used to optimize the investigation program which will lead to the development of a cost-effective remedial action. As part of the scope of the Remedial Investigation (RI), the data needs and significance of the key parameters as related to the final remedial design should be assessed and determined to obtain necessary data in a timely and cost-effective manner. Properly verified groundwater computer models are powerful tools for both identifying data gaps which must be filled before an appropriate design can be prepared and for assessing the significance of site features on the problem and solution. These models can be used effectively during both the RI and Feasibility Study (FS) phases. In the RI phase, the models can be used for optimization of field and laboratory testing programs and in data analysis to assess adequateness of the field investigation and provide basic data for

Sirous H. Djafari; David E. Troxell

1990-01-01T23:59:59.000Z

111

Chicago Climate Action Plan | Open Energy Information  

Open Energy Info (EERE)

Action Plan Action Plan Jump to: navigation, search Name Chicago Climate Action Plan Agency/Company /Organization City of Chicago Focus Area Buildings, Energy Efficiency - Central Plant, Greenhouse Gas, Other, Non-renewable Energy, Transportation, Renewable Energy Phase Prepare a Plan Topics Low emission development planning Resource Type Case studies/examples Availability Free Website http://www.chicagoclimateactio Locality Chicago, IL References Chicago Climate Action Plan[1] Overview Chicago's Climate Action Plan addresses both mitigation of and adaptation to climate change and encompasses the entire city (rather than only City operations). The plan contains a high-level overview of Chicago's climate action initiatives, including 26 mitigation strategies and nine adaptation

112

Remedial Investigation Work Plan for J-Field, Aberdeen Proving Ground, Maryland  

SciTech Connect

The purpose of an RI/FS is to characterize the nature and extent of the risks posed by contaminants present at a site and to develop and evaluate options for remedial actions. The overall objective of the RI is to provide a comprehensive evaluation of site conditions, types and quantities of contaminants present, release mechanisms and migration pathways, target populations, and risks to human health and the environment. The information developed during the RI provides the basis for the design and implementation of remedial actions during the FS. The purpose of this RI Work Plan is to define the tasks that will direct the remedial investigation of the J-Field site at APG.

Benioff, P.; Biang, R.; Dolak, D.; Dunn, C.; Haffenden, R.; Martino, L.; Patton, T.; Wang, Y.; Yuen, C.

1995-03-01T23:59:59.000Z

113

Climate Change Action Plan Report  

E-Print Network (OSTI)

Climate Change Action Plan Report Intermountain Region 2013 National Park Service Resource Stewardship and Science Landscape Conservation and Climate Change Division #12;About this Report Each National Park Service is responding to the challenge of climate change; and (2) raise awareness among NPS

Hansen, Andrew J.

114

CLIMATE ACTION PLAN SEPTEMBER 2009  

E-Print Network (OSTI)

· ALBUQUERQUE, NEW MEXICO #12;#12;The University of New Mexico is committed to reducing energy usage and ourCLIMATE ACTION PLAN SEPTEMBER 2009 UNIVERSITY OF NEW MEXICO · OFFICE OF SUSTAINABILITY ................................ 18 C. Electricity Recommendation #1 Solar........... 21 D. Electricity Recommendation #2 Smart Grid

Maccabe, Barney

115

Missouri State information handbook: formerly utilized sites remedial action program  

SciTech Connect

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations, and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

116

CLIMATE ACTION PLAN JUNE 1, 2010  

E-Print Network (OSTI)

UC DAVIS 2009­2010 CLIMATE ACTION PLAN JUNE 1, 2010 #12;UC Davis 2009-2010 Climate Action Plan Page 2 UC DAVIS 2009-2010 CLIMATE ACTION PLAN TABLE OF CONTENTS Acknowledgements...................................................................................................... 24 Chapter 3: Emissions Reduction Actions 3.1 Energy Use Reduction to Date

Schladow, S. Geoffrey

117

The U.S. Department of Energy Formerly Utilized Sites Remedial Action  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The U.S. Department of Energy Formerly Utilized Sites Remedial The U.S. Department of Energy Formerly Utilized Sites Remedial Action Program: Ensuring Protectiveness and Preserving Knowledge The U.S. Department of Energy Formerly Utilized Sites Remedial Action Program: Ensuring Protectiveness and Preserving Knowledge The U.S. Department of Energy Formerly Utilized Sites Remedial Action Program: Ensuring Protectiveness and Preserving Knowledge (Waste Management Conference 2010) The U.S. Department of Energy Formerly Utilized Sites Remedial Action Program: Ensuring Protectiveness and Preserving Knowledge More Documents & Publications Implementation of the Formerly Utilized Sites Remedial Action Program: Coordination Between the U.S. Department of Energy and the U.S. Army Corps of Engineers Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP

118

FORMERLY USED SITES REMEDIAL ACTION PROGRAM DESIGNATION SUMMARY  

Office of Legacy Management (LM)

USED SITES USED SITES REMEDIAL ACTION PROGRAM DESIGNATION SUMMARY FOR ALBA CRAFT LABORATORY OXFORD, OHIO October 1, 1992 U.S. DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL RESTORATION Designation Summary Alba Craft Laboratory. Oxford CONTENTS INTRODUCTION .......... . . ..................... 1 BACKGROUND Site Function ......................... Site Description ..................... 1 Owner History ................. .. 2 Radiological History and Status............ 2 Authority Review .................... .. 3 DESIGNATION DETERMINATION ........ ....... 3 REFERENCES . ............ .... . 3 Designation Summary Alba Craft Laboratory, Oxford INTRODUCTION The Department of Energy (DOE), Office of Environmental Restoration, has reviewed the past activities of the Atomic Energy Commission (AEC) at the

119

CSMRI Site Remediation Quality Assurance Project Plan March 30, 2004 TABLE OF CONTENTS  

E-Print Network (OSTI)

..........................................................................................................................................5 9.0 Ground- and Surface-Water MonitoringCSMRI Site Remediation Quality Assurance Project Plan March 30, 2004 TASK PLAN TABLE OF CONTENTS 1 .............................................................................................5 FIGURES #12;CSMRI Site Remediation Task Plan March 31, 2004 TASK PLAN CSMRI SITE REMEDIATION 1

120

National Action Plan on Demand Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Plan on Demand National Action Plan on Demand Action Plan on Demand National Action Plan on Demand Response Response Federal Utilities Partnership Working Group Federal Utilities Partnership Working Group November 18, 2008 November 18, 2008 Daniel Gore Daniel Gore Office of Energy Market Regulation Office of Energy Market Regulation Federal Energy Regulatory Commission Federal Energy Regulatory Commission The author's views do not necessarily represent the views of the Federal Energy Regulatory Commission Presentation Contents Presentation Contents Statutory Requirements Statutory Requirements National Assessment [Study] of Demand Response National Assessment [Study] of Demand Response National Action Plan on Demand Response National Action Plan on Demand Response General Discussion on Demand Response and Energy Outlook

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

DOE/OR/20722-88 Formerly Utilized Sites Remedial Action Program (FUSRAP)  

Office of Legacy Management (LM)

88 88 . Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-810R20722 POST-REMEDIAL ACTION REPORT FOR THE WAYNE SITE - 1985 AND 1987 Wayne, New Jersey March 1989 Bechtel National, Inc. DOE/OR/20722-88 POST-REMEDIAL ACTION REPORT FOR THE WAYNE SITE - 1985 AND 1987 WAYNE, NEW JERSEY MARCH 1989 Prepared for UNITED STATES DEPARTMENT OF ENERGY OAK RIDGE OPERATIONS OFFICE Under Contract No. DE-AC05-810R20722 BY R. M. Howard Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 TABLE OF CONTENTS Paqe 1.0 2.0 3.0 4.0 Introduction 1.1 Background 1.2 History Remedial Action Guidelines 5 Remedial Action 3.1 Cleanup/Decontamination Activities 3.2 Contamination Control During the Cleanup 8 8 11 Post-Remedial-Action Sampling 13

122

Massachusetts state information handbook: formerly utilized sites remedial action program  

SciTech Connect

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

None

1981-02-09T23:59:59.000Z

123

Florida state information handbook: formerly utilized sites remedial action program  

SciTech Connect

This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the federal and state levels, the pertinent programs they administer, each affected state legislature, and current federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Florida. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

None

1981-02-27T23:59:59.000Z

124

Oregon state information handbook: formerly utilized sites remedial action program  

SciTech Connect

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

125

Maryland State information handbook: formerly utilized sites remedial action program  

SciTech Connect

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Handbook Series Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

126

Oregon state information handbook formerly utilized sites remedial action program  

SciTech Connect

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

none,

1980-12-31T23:59:59.000Z

127

California state information handbook: formerly utilized sites remedial action program  

SciTech Connect

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of California. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

none,

1981-02-09T23:59:59.000Z

128

Risk assessment in the DOE Assurance Program for Remedial Action  

SciTech Connect

This document provides information obtained during the performance of risk assessment tasks in support of the Assurance Program for Remedial Action (APRA) sponsored by the Office of Operational Safety of the Department of Energy. We have presented a method for the estimation of projected health effects at properties in the vicinity of uranium mill tailing piles due to transported tailings or emissions from the piles. Because radon and radon daughter exposure is identified as the principal factor contributing to health effects at such properties, the basis for estimating lung cancer risk as a result of such exposure is discussed in detail. Modeling of health risk due to a secondary pathway, ingestion of contaminated, home-grown food products, is also discussed since it is a potentially important additional source of exposure in certain geographic locations. Risk assessment methods used in various mill tailings reports are reviewed. The protocols for radiological surveys conducted in DOE-sponsored remedial action programs are critically reviewed with respect to their relevance to the needs of health risk estimation. The relevance of risk assessment to the APRA program is discussed briefly.

Marks, S.; Cross, F.T.; Denham, D.H.; Kennedy, W.E.; Stenner, R.D.

1985-08-01T23:59:59.000Z

129

Geoengineering: Plan B Remedy for Global Warming Andrew A. Lacis  

NLE Websites -- All DOE Office Websites (Extended Search)

Geoengineering: Plan B Remedy for Global Warming Geoengineering: Plan B Remedy for Global Warming Andrew A. Lacis NASA Goddard Institute for Space Studies Accelerated melting of Greenland ice is a clear indication that consequences of global warming are real and impending. The underlying causes of global warming are well enough understood, but the necessary reduction of greenhouse gases to prevent irreversible climate change is unlikely to happen before the point of no return is reached. To reverse the impending sea level rise, geoengineering counter- measures may be required to counter the current global energy imbalance due to global warming. Of the many proposed remedies, deploying aerosols within the stratosphere offers realistic prospects. Sulfur injections in the lower stratosphere would have the cooling effect of naturally occurring volcanic aerosols. Soot at

130

DOE/OFVZ1949402 Formerly Utilized Sites Remedial Action Program (FUSRAP)  

Office of Legacy Management (LM)

DOE/OFVZ1949402 DOE/OFVZ1949402 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-ACO5-9%OR21949 Post-Remedial Action Report for the Former Baker Brothers Site Toledd, Ohio . February 1997 . . DOWORRl949-402 POST-REMEDIAL ACTION REPORT FOR THE REMEDIAL ACTION ATTHE FORMER BAKER BROTHERS SITE TOLEDO. OHIO FEBRUARY 1997 . United States Department of Energy I OakRidgeOpcrationsOfficc Under Contract No. DE-AC059 I OR2 1949 BY Bcchtcl National, Inc. . . : ; '.' OakRldnc.Tc~~~.- ~--~-' -------m . . Be&cl Job No. 14501 CQNTENTS FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..~~................................................................................ iv TABLES . . . . . . . ..i.................................................................................................................................

131

EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the potential environmental impacts of a proposal to conduct remedial action at Operable Unit 4 at the Fernald Environmental Management Project.

132

Expedited approach to a carbon tetrachloride spill interim remedial action  

SciTech Connect

Monitored natural attenuation was selected as an interim measure for a carbon tetrachloride spill site where source removal or in situ treatment cannot currently be implemented due to the surrounding infrastructure. Rather than delay action until the site is more accessible to an interim action, this more expedited approach would support a final action. Individual Hazard Substance Site (IHSS) 118.1 is a former underground storage tank at Rocky Flats Environmental Technology Site (RFETS) that stored carbon tetrachloride for process use. Inadvertent releases associated with filling and failure of the tank system resulted in an accumulation of carbon tetrachloride in a bedrock depression around a group of former process waste tanks. Access to the source of contamination is obstructed by numerous utilities, the process waste tanks, and other components of the site infrastructure that limit the ability to conduct an effective remedial action. A preremedial field investigation was conducted in September 1997 to identify and delineate the extent of the dense nonaqueous phase liquid (DNAPL) in the subsurface. Data collected from the investigation revealed that natural processes might be limiting the migration of contaminants from the source area.

Cowdery, C.; Primrose, A. [Rocky Mountain Remediation Services, LLC, Golden, CO (United States). Rocky Flats Environmental Technology Site; Uhland, J. [Kaiser-Hill, LLC, Golden, CO (United States). Rocky Flats Environmental Technology Site; Castaneda, N. [Dept. of Energy, Golden, CO (United States). Rocky Flats Environmental Technology Site

1998-07-01T23:59:59.000Z

133

Tank waste remediation system program plan  

SciTech Connect

This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

Powell, R.W.

1998-01-09T23:59:59.000Z

134

Community Involvement Plan: Remedial Investigation of UMore Park East, Dakota County, Minnesota  

E-Print Network (OSTI)

i Community Involvement Plan: Remedial Investigation of UMore Park East, Dakota County, Minnesota Appendix A Fact Sheet on Planned Remedial Investigation of UMore Park East UMP012331 #12;1 1.0 Overview participation in the planned Remedial Investigation (RI) of the eastern portion of the University of Minnesota

Netoff, Theoden

135

EIS-0397: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EIS-0397: Mitigation Action Plan Lyle Falls Fish Passage Project This Mitigation Action Plan identifies measures that are intended to avoid, reduce, or...

136

EA-1912: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Mitigation Action Plan EA-1912: Mitigation Action Plan Midway-Benton No. 1 Rebuild Project, neartown of Desert Aire, Benton County, Washington This Mitigation Action Plan (MAP)...

137

EA-1891: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EA-1891: Mitigation Action Plan Alvey-Fairview Transmission Line Rebuild Project, Oregon This Mitigation Action Plan (MAP) is part of the Finding of No...

138

Tank waste remediation system systems engineering management plan  

SciTech Connect

This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation Systems (TWRS) implementation of U.S. Department of Energy (DOE) Systems Engineering (SE) policy provided in Tank Waste Remediation System Systems Engineering Management Policy, DOE/RL letter, 95-RTI-107, Oct. 31, 1995. This SEMP defines the products, process, organization, and procedures used by the TWRS Program to accomplish SE objectives. This TWRS SEMP is applicable to all aspects of the TWRS Program and will be used as the basis for tailoring SE to apply necessary concepts and principles to develop and mature the processes and physical systems necessary to achieve the desired end states of the program.

Peck, L.G.

1996-02-06T23:59:59.000Z

139

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

CONTENTS CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS REFERENCES ii Pa e -5 1 : 2 2 4 ELIMINATION REPORT THE FORMER VIRGINIA-CAROLINA CHEMICAL CORPORATION RICHMOND, VIRGINIA INTROUUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of Remedial Action and Waste Technology, Division of Facility and Site Decommissioning Projects (and/or predecessor agencies, offices and divisions, has reviewed the past activities of the Atomic Energy Commission (AEC) at the former Virginia-Carolina Chemical Corporation, Richmond, Virginia. On the basis of historical information, DOE has determined that any radioactive material potentially remaining from these activities would be insignificant in terms of both its quantity and the hazard it would

140

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINATION REPORT  

Office of Legacy Management (LM)

. . CONTENTS INTROOUCTION BACKGROUND Site Function Site Description Radiological History,and Status ELIMINATION ANALYSIS REFERENCES 9 1 1 2 2 2 4 ii ELIMINATION REPORT THE FORMER VIRGINIA-CAROLINA CHEMICAL CORPORATION RICHMOND. VIRGINIA INTROLJUCTION The Department of Energy (DOE), Office of Nuclear Energy, Office of ,Remedial Action and Waste Technology, Division of Facility and Site Deconunissioning Projects (and/or predecessor agencies, offices and divisions, has reviewed the past activities of the Atomic Energy Carmission (AEC) at the former Virginia-Carolina Chemical Corporation, Richmond, Virginia. On the basis of historical information, DOE has determined that any radioactive material potentially remaining from these activities would oe insignificant in terms of both its quantity and the hazard it would

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

UC-70A Formerly Utilized Sites Remedial Action Program (FUSRAP)  

Office of Legacy Management (LM)

F. a% F. a% .~~~~~~":~,~~~~,~. .-+smiii"-l ," ^.-. _ _I ,a ,' ~, *p2 - QRkl~ oR,o~ DOE/OR/20722- 29 UC-70A Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-ACO5-81OR20722 CI c F c F F c CI c c F P RADIOLOGICAL SURVEY OF THE ALBANY RESEARCH CENTER Albany, O regon Bechtel National, inc. Advanced Technology Division L- ..^___ ~. _ .._.. -.~~_-- ._ ._.. .._ .^.". January 1985 Technical information Center Office of Scientific and Technical Information U.S. Department of Energy LEGAL NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United States Department of Energy, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty, express or implied,

142

Remedial Action Certification Docket - Sodium Reactor Experiment (SRE)  

Office of Legacy Management (LM)

c~-?i-- c~-?i-- I ,3-l Remedial Action Certification Docket - Sodium Reactor Experiment (SRE) .Complex and the Hot Cave Facility (Bldg. 003), Santa Susana ,Fie!d Laboratory, Chatsworth, California ..:'..~::Yerlette Gatl in, MA-232 I am attaching for entry into the Public Document Room, one copy of the N -23 subject documentat ion. These documents are the backup data for the certification that the facilfties are radiologically acceptable for b- unrestricted use as noted in the certification statement published in the &aney Federal Register. Inasmuch as the certification for unrestricted use is 9/2(/85 being published in the Federal Register, it is prudent that the attached documentation also be available to the public. These documents should be retained In accordance with DOE Order 1324.2--disposal schedule 25.

143

DOE/EA-1155 Uranium Mill Tailing Remedial Action Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

55 55 Uranium Mill Tailing Remedial Action Project Environmental Assessment of Ground- Water Compliance Activities At the Uranium Mill Tailings Site Spook, Wyoming February 1997 Prepared by U.S. Department of Energy Albuquerque Operations Office Grand Junction Office This page intentionally blank : illegible Portions of tbis DISCLAIMER document may be in electronic image products. Images are produced fiom the best available original dOClMXlf?IlL DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liabili- ty or responsibility for the accuracy, completeness,

144

Environmental restoration and remediation technical data management plan  

SciTech Connect

The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit.

Key, K.T.; Fox, R.D.

1994-02-01T23:59:59.000Z

145

VA Energy Management Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

VA Energy Management VA Energy Management Action Plan Ken Demers Chief, VA National Energy Business Center Purpose Cited Deficiencies Within VA's Previous Energy Program... *No comprehensive Department-wide policy *Lack of coordinated acquisition and investment strategies throughout the Administrations and Staff Offices *No uniform measurement and verification of energy usage *Unverifiable reporting mechanism *Lack of capturing "lessons learned" and best practices from previous experiences Potential Annual Savings ENERGY COST ($000) CONSUMPTION (Billion Btu) Baseline - FY 2005: $397,577 Baseline - FY 2005: 29,094 Savings Savings SOURCE OF SAVINGS FY 2007 FY 2008 Future TOTAL

146

Corrective Action Investigation Plan for Corrective Action Unit...  

Office of Scientific and Technical Information (OSTI)

Plan for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada Re-direct Destination: Temp Data Fields Matthews, Patrick...

147

North Slope (Wahluke Slope) expedited response action cleanup plan  

SciTech Connect

The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi{sup 2} (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part of the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives.

Not Available

1994-02-01T23:59:59.000Z

148

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12  

SciTech Connect

The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

Not Available

1991-09-01T23:59:59.000Z

149

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 12. Environmental Restoration Program  

SciTech Connect

The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.

Not Available

1991-09-01T23:59:59.000Z

150

Alternatives for management of wastes generated by the formerly utilized sites remedial action program and supplement  

SciTech Connect

Alternatives for disposal or stabilization of the wastes generated by the US Department of Energy's Formerly Utilized Sites Remedial Action Program (FUSRAP) are identified and compared, with emphasis on the long-term aspects. These wastes consist of soil material and rubble containing trace amounts of radionuclides. A detailed pathway analysis for the dose to the maximally exposed individual is carried out using an adaptation of the natural analogue method. Comparisons of the different alternatives, based on the results of the pathway analysis and qualitative cost considerations, indicate that, if the hazard is such that the wastes must be removed and disposed of rather than stabilized in place, disposal by immediate dispersal is preferable to containment, and containment followed by slow planned dispersal is preferable to containment without dispersal. The Supplement presents refinements of work that was reported at the 1982 International Decommissioning Symposium. The new material consists of revisions of the estimates of the predicted potential dose to the maximally exposed individual and a more detailed comparative assessment of the radiological impacts of alternatives for management of wastes generated by the US Department of Energy's Formerly Utilized Sites Remedial Action Program (FUSRAP).

Gilbert, T.L.; Peterson, J.M.; Vocke, R.W.; Alexander, J.K.

1983-03-01T23:59:59.000Z

151

Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites  

SciTech Connect

The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites.

NONE

1995-10-01T23:59:59.000Z

152

Open government partnership: Argentina action plan  

Science Journals Connector (OSTI)

In 2009, Iberoamerican countries signed the Charter of Citizen Participation in Public Administration. Well in advance in 2003, the Argentinean Government issued a decree ensuring freedom of information. Based on such decree and fulfilling the commitments ... Keywords: argentina action plan, government action plan, open government, public policies

Pedro Janices; Natalia Aguerre

2013-10-01T23:59:59.000Z

153

Corrective action investigation plan: Area 2 Photo Skid 16 Wastewater Pit, Corrective Action Unit 332. Revision 1  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) contains a detailed description and plan for an environmental investigation of the Area 2 Photo Skid 16 Wastewater Pit. The site is located in Area 2 of the Nevada Test Site. The Photo Skid Wastewater Pit was used for disposal of photochemical process waste, and there is a concern that such disposal may have released photochemicals and metals to the soil beneath the pit and adjacent to it. The purpose of this investigation is to identify the presence and nature of contamination present in and adjacent to the wastewater pit and to determine the appropriate course of environmental response action for the site. The potential courses of action for the site are clean closure through remediation, closure in place (with or without remediation), or no further action.

NONE

1997-01-01T23:59:59.000Z

154

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes  

SciTech Connect

This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

1992-09-01T23:59:59.000Z

155

Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Report  

SciTech Connect

This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

Lee Davison

2009-06-30T23:59:59.000Z

156

Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System Remedial Action Request  

SciTech Connect

This Remedial Action Report summarizes activities undertaken to remediate the Operable Unit 3-13, Group 7, SFE-20 Hot Waste Tank System at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The site addressed in this report was defined in the Operable Unit 3-13 Record of Decision and subsequent implementing documents. This report concludes that remediation requirements and cleanup goals established for the site have been accomplished and is hereafter considered a No Further Action site.

L. Davison

2009-06-30T23:59:59.000Z

157

President Obama Announces His Climate Action Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

President Obama Announces His Climate Action Plan Print E-mail President Obama Announces His Climate Action Plan Print E-mail President Obama Announces His Climate Action Plan Monday, July 1, 2013 On Tuesday, June 25, in a speech at Georgetown University, President Obama announced his comprehensive plan for steady, responsible action to cut carbon pollution, prepare the Nation for the impacts of climate change, and lead international efforts to address climate change as a global challenge. The Plan builds on significant progress made during the Administration's first term on all of these fronts, including those based on the ongoing scientific work of USGCRP's 13 member-agencies, the Interagency Climate Change Adaptation Task Force in which USGCRP participates, and USGCRP's National Climate Assessment team.

158

DOE/OR/21949-370 Formerly Utilized Sites Remedial Action Program (FUSRAP)  

Office of Legacy Management (LM)

1949-370 1949-370 Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-AC05-91 OR21 949 Post-Remedial Action Report for the Removal Action at the Seymour Specialty Wire Site Seymour, Connecticut Printed on recyded/recyclable paper. @ 4.132 1890.1 January 1994 . DOE/OR/2 1949-370 POST-REMEDIAL ACTION REPORT FOR THE REMOVAL ACTION AT THE SEYMOUR SPECIALTY WIRE SITE SEYMOUR, CONNECTICUT JANUARY 1994 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC05-9 1 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 . \ CONTENTS Page FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v ACRONYMS . . . . . . . . . . .

159

FINDING OF MD SIGNIFICANT IMPACT FORMERLY UTILIZED HED/AEC SITES REMEDIAL ACTION PROGRAM:  

Office of Legacy Management (LM)

FINDING OF MD SIGNIFICANT IMPACT FINDING OF MD SIGNIFICANT IMPACT FORMERLY UTILIZED HED/AEC SITES REMEDIAL ACTION PROGRAM: BAY0 CANYONS, NEW MEXICO Under the Formerly Utilized Sites Remedial Action Program (FUSRAP), the U.S. Department of Energy (DOE) has proposed to carry out rcmedfrl action at a site located in Bayo Canyon, Los Alamos County, New Mexico. Although the site as partially decontaminated and decommissioned in the 196Os, there remain above-background amounts of radionuclides. DOE has determined that strontium-90 in excess of DDE's proposed remedial- action criterir exists in subsurface materials underlying an area of about 0.6 ha (1.5 acres) at the Bayo Canyon site. The proposed action is to demarcate this are8 and restrict its use to activities that will not disturb this sub-

160

Pinellas Remediation Agreement Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pinellas Pinellas Agreement Name Remediation Agreement for the Four and One-Half Acre Site in Largo, Pinellas County, Florida State Florida Agreement Type Remediation Agreement Legal Driver(s) CERCLA/ Atomic Energy Act of 1954, as amended/ Florida Air and Water Pollution Control Act Scope Summary Remediation of property adjacent to the former Pinellas Plant Parties DOE; Florida Department of Environmental Protection Date 3/12/2001 SCOPE * Remediate the groundwater under a parcel of property adjacent to DOE's former Pinellas Plant to levels consistent with industrial use. * Complete remedial actions at the site in accordance with a Remedial Action Plan prepared by DOE and approved by FDEP. * Submit quarterly reports of interim remedial actions at the Site.

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Remedial action selection report Maybell, Colorado, site. Final report  

SciTech Connect

The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The site is 2.5 mi (4 km) northeast of the Yampa River on relatively flat terrain broken by low, flat-topped mesas. U.S. Highway 40 runs east-west 2 mi (3.2 km) south of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. The site is situated between Johnson Wash to the east and Rob Pit Mine to the west. Numerous reclaimed and unreclaimed mines are in the immediate vicinity. Aerial photographs (included at the end of this executive summary) show evidence of mining activity around the Maybell site. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [ml]) and contains 2.8 million cubic yards (yd{sup 3}) (2.1 million cubic meters [m{sup 3}]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd 3 (15,000 m{sup 3}) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd{sup 3}(420,000 m{sup 3}). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd{sup 3} (2.58 million m{sup 3}).

NONE

1996-12-01T23:59:59.000Z

162

Climate Action Plan (Michigan) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Michigan) Climate Action Plan (Michigan) Climate Action Plan (Michigan) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Michigan Program Type Climate Policies Provider Michigan Department of Environmental Quality On November 14, 2007, Governor Jennifer M. Granholm issued Executive Order

163

Climate Action Plan (Minnesota) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Minnesota) Climate Action Plan (Minnesota) Climate Action Plan (Minnesota) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Minnesota Program Type Climate Policies Provider MN Deparment of Commerce Recognizing the implications that global climate change may have on the

164

Climate Action Plan (Pennsylvania) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Pennsylvania) Climate Action Plan (Pennsylvania) Climate Action Plan (Pennsylvania) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Pennsylvania Program Type Climate Policies Provider Department of Environmental Protection The Office of Pollution Prevention and Energy Assistance works with

165

Climate Action Plan (Montana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Montana) Climate Action Plan (Montana) Climate Action Plan (Montana) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Montana Program Type Climate Policies Provider Department of Environmental Quality Recognizing the profound implications that global warming and climate variation could have on the economy, environment and quality of life in Montana, the Climate Change Advisory Committee (CCAC) was established with

166

Climate Action Plan (Wisconsin) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Wisconsin) Climate Action Plan (Wisconsin) Climate Action Plan (Wisconsin) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Wisconsin Program Type Climate Policies Provider University of Wisconsin In April 2007, Governor Doyle signed Executive Order 191 which brought

167

DOE Action Plan Addressing the Electricity Distribution System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ACTION PLAN ACTION PLAN ADDRESSING THE ELECTRICITY DISTRIBUTION SYSTEM ~DRAFT~ DOE Action Plan Addressing the Electricity Distribution System 1 Table of Contents INTRODUCTION ................................................................................................................... 2 The Grid Tech Team ................................................................................................ 2 Focus on Distribution .............................................................................................. 3 Roadmap Goals ....................................................................................................... 3 PROCESS OVERVIEW ........................................................................................................... 4

168

EIS-0473: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Plan EIS-0473: Mitigation Action Plan W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, Texas This Mitigation Action Plan (MAP)...

169

Guide to ground water remediation at CERCLA response action and RCRA corrective action sites  

SciTech Connect

This Guide contains the regulatory and policy requirements governing remediation of ground water contaminated with hazardous waste [including radioactive mixed waste (RMW)], hazardous substances, or pollutants/contaminants that present (or may present) an imminent and substantial danger. It was prepared by the Office of Environmental Policy and Assistance, RCRA/CERCLA Division (EH-413), to assist Environmental Program Managers (ERPMs) who often encounter contaminated ground water during the performance of either response actions under CERCLA or corrective actions under Subtitle C of RCRA. The Guide begins with coverage of the regulatory and technical issues that are encountered by ERPM`s after a CERCLA Preliminary Assessment/Site Investigation (PA/SI) or the RCRA Facility Assessment (RFA) have been completed and releases into the environment have been confirmed. It is based on the assumption that ground water contamination is present at the site, operable unit, solid waste management unit, or facility. The Guide`s scope concludes with completion of the final RAs/corrective measures and a determination by the appropriate regulatory agencies that no further response action is necessary.

NONE

1995-10-01T23:59:59.000Z

170

Climate Action Planning Tool | Open Energy Information  

Open Energy Info (EERE)

Planning Tool Planning Tool Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Climate Action Planning Tool Agency/Company /Organization: National Renewable Energy Laboratory Sector: Climate, Energy Focus Area: Renewable Energy, Buildings, Energy Efficiency, Greenhouse Gas, Industry, - Industrial Processes, People and Policy, Transportation Phase: Prepare a Plan, Develop Finance and Implement Projects Resource Type: Guide/manual, Online calculator User Interface: Website Website: www.nrel.gov/applying_technologies/planning_tool/ Web Application Link: www.nrel.gov/applying_technologies/planning_tool/gather_data.cfm Cost: Free Overview This tool is a step by step calculator to find the impact of various technologies to an overall action plan. The target of the tool is research

171

Tank waste remediation system multi-year work plan  

SciTech Connect

The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

Not Available

1994-09-01T23:59:59.000Z

172

The University of Connecticut Climate Action Plan  

E-Print Network (OSTI)

The University of Connecticut Climate Action Plan: Guiding the Path toward Carbon Neutrality Storrs ................................................................................................................................143 Cover Photo: University of Connecticut President, Susan Herbst, reaffirms UConn's commitment; Susan Herbst, University of Connecticut President; Gene Likens, Distinguished Visiting Faculty

Holsinger, Kent

173

EA-1562-SA-1: Mitigation Action Plan  

Energy.gov (U.S. Department of Energy (DOE))

Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington (Mitigation Action Plan for Phase II Build Out, North Federal Campus, PNNL Site)

174

US - Brazil Binational Energy Working Group Joint Action Plan...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

US - Brazil Binational Energy Working Group Joint Action Plan US - Brazil Binational Energy Working Group Joint Action Plan brazilactionplan7202010.pdf More Documents &...

175

Burundi-National Adaptation Plan of Action to Climate Change...  

Open Energy Info (EERE)

Burundi-National Adaptation Plan of Action to Climate Change Jump to: navigation, search Name Burundi-National Adaptation Plan of Action to Climate Change AgencyCompany...

176

National Action Plan on Demand Response | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Action Plan on Demand Response National Action Plan on Demand Response Presentation-given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008...

177

2012 National Energy Assurance Planning Conference After-Action...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Energy Assurance Planning Conference After-Action Report (August 2012) 2012 National Energy Assurance Planning Conference After-Action Report (August 2012) On June 28-29,...

178

EIS-0389: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EIS-0389: Mitigation Action Plan Trinity Public Utilities District Direct Interconnection Project Western Area Power Administration (Western) proposes to...

179

EIS-0026: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EIS-0026: Mitigation Action Plan Waste Isolation Pilot Plant This MAP focuses on mitigation commitments stated in the RODs to the 1980 Final Environmental...

180

United States and Japan Sign Joint Nuclear Energy Action Plan...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy Cooperation United States and Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy...

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

United States -Japan Joint Nuclear Energy Action Plan | Department...  

Energy Savers (EERE)

United States -Japan Joint Nuclear Energy Action Plan United States -Japan Joint Nuclear Energy Action Plan President Bush of the United States and Prime Minister Koizumi of Japan...

182

Implement an Institutional Change Action Plan for Sustainability...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Implement an Institutional Change Action Plan for Sustainability Implement an Institutional Change Action Plan for Sustainability Graphic showing 5 gears. They progress from...

183

Develop an Institutional Change Action Plan for Sustainability...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Develop an Institutional Change Action Plan for Sustainability Develop an Institutional Change Action Plan for Sustainability Graphic showing 5 gears. They progress from Determine...

184

EA-1595: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan EA-1595: Mitigation Action Plan Davis-Mead 230-kV Transmission Line Reconductor Project Western Area Power Administration proposes to reconductor...

185

EIS-0422: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Plan EIS-0422: Mitigation Action Plan Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Mitigation measures and estimated time of implementation within...

186

EA-1679: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Plan EA-1679: Mitigation Action Plan Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington This MAP is for...

187

Tank waste remediation system systems engineering management plan  

SciTech Connect

This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves. The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.

Peck, L.G.

1998-01-08T23:59:59.000Z

188

Remediation  

SciTech Connect

The three most frequently used remediation technologies are discussed: (1) NAPL removal, (2) Pump-and-Treat, (3) Soil Vapor Extraction.

Oostrom, Mart; Falta, Ron W.; Mayer, Alex S.; Javandel, I.; Hassanizadeh, S. M.

2005-12-06T23:59:59.000Z

189

ACTION PLANS STRATEGIC PRIORITY: Role Clarification (revised)  

E-Print Network (OSTI)

with the President, Director & Associate Director. Review current communications plan for Executive and BoardACTION PLANS STRATEGIC PRIORITY: Role Clarification (revised) GOAL Foster pride and participation informed MAA Board Investigate an increase in number of Executive Committee meetings with standard agenda

Thompson, Michael

190

FTCP Corrective Action Plan- Revision 1  

Energy.gov (U.S. Department of Energy (DOE))

January 2007 FTCP Corrective Action Plan, Revision 1, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004- 1, Oversight of Complex, High-Hazard Nuclear Operations

191

FTCP Corrective Action Plan- Revision 2  

Energy.gov (U.S. Department of Energy (DOE))

March 2009 FTCP Corrective Action Plan, Revision 2, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations

192

FY 95 engineering work plan for the design reconstitution implementation action plan  

SciTech Connect

Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities, a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.

Bigbee, J.D.

1994-11-09T23:59:59.000Z

193

Overview of the U.S. Department of Energy Formerly Utilized Sites Remedial Action Program - 12189  

SciTech Connect

The U.S. Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to address residual radiological contamination at sites where work was performed for the Manhattan Engineer District and U.S. Atomic Energy Commission. Initially, FUSRAP activities began with a records search for sites that had the potential to contain residual radiological contamination; 46 sites were identified that were eligible for and required remediation. Remedial action began in 1979. In 1997, Congress assigned responsibility for the remediation of FUSRAP sites to the U.S. Army Corps of Engineers (USACE). DOE retains responsibility for determining if sites are eligible for FUSRAP remediation and for providing long-term surveillance and maintenance (LTS&M) of remediated FUSRAP sites. DOE LTS&M activities are designed to ensure that FUSRAP sites remain protective of human health and the environment and to preserve knowledge regarding FUSRAP sites. Additional elements include eligibility determinations, transition of remediated sites from USACE to DOE, LTS&M operations such as inspections and institutional controls management, stakeholder support, preservation of records, and real property and reuse. DOE maintains close coordination with USACE and regulators to ensure there is no loss of protectiveness when sites transition to DOE for LTS&M.

Clayton, Christopher [U.S. Department of Energy Office of Legacy Management, Washington, DC; Kothari, Vijendra [U.S. Department of Energy Office of Legacy Management, Morgantown, West Virginia; Starr, Ken [U.S. Department of Energy Office of Legacy Management, Westminster, Colorado; Gillespie, Joey [S.M. Stoller Corporation, Contractor for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado; Widdop, Michael [S.M. Stoller Corporation, Contractor for the U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado; none,

2012-02-26T23:59:59.000Z

194

ANL=OHS/HP=83=102 FORMERLY UTILIZED MEDIAEC SITES REMEDIAL ACTION PROGRAM  

Office of Legacy Management (LM)

' DO E/EV=0005/40 ' DO E/EV=0005/40 ANL=OHS/HP=83=102 FORMERLY UTILIZED MEDIAEC SITES REMEDIAL ACTION PROGRAM RADIOLOGICAL SURVEY OF THE ALBANY METALLURGICAL RESEARCH CENTER UNITED STATES BUREAU OF MINES ALBANY, OREGON Q\OLO G/C G- 4& G Remedial Action and Decommissioning Program (UC-70A) DOE/EV-0005/40 ANL-OHS/HP-83-102 ARGONNE NATIONAL LABORATORY 9700 South Cass Avenue Argonne, Illinois 60439 FORMERLY UTILIZED MED/AEC SITES REMEDIAL ACTION PROGRAM RADIOLOGICAL SURVEY OF THE ALBANY METALLURGICAL RESEARCH CENTER

195

Sixth Northwest Conservation and Electric Power Plan Sixth Power Plan Action Plan  

E-Print Network (OSTI)

are organized by resource areas, Bonneville Power Administration, and Council monitoring activities. In manySixth Northwest Conservation and Electric Power Plan Sixth Power Plan Action Plan Introduction ................................................. 15 Future Role of Bonneville

196

United States-Japan Joint Nuclear Energy Action Plan | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States-Japan Joint Nuclear Energy Action Plan United States-Japan Joint Nuclear Energy Action Plan An outline on the United States and Japan's joint nuclear energy action...

197

Climate Action Planning Tool Formulas and Assumptions  

NLE Websites -- All DOE Office Websites (Extended Search)

CLIMATE ACTION PLANNING TOOL FORMULAS AND ASSUMPTIONS Climate Action Planning Tool Formulas and Assumptions The Climate Action Planning Tool calculations use the following formulas and assumptions to generate the business-as-usual scenario and the greenhouse gas emissions reduction goals for the technology options. Business-as-Usual Scenario All Scope 1 (gas, oil, coal, fleet, and electricity) and Scope 2 calculations increase at a rate equal to the building growth rate. Scope 3 calculations (commuters and business travel) increase at a rate equal to the population growth rate. Assumptions New buildings will consume energy at the same rate (energy use intensity) as existing campus buildings. Fleet operations will be proportional to total building area.

198

Action plan for the Tiger Team assessment report  

SciTech Connect

This document contains responses and planned actions that address the findings of the Tiger Team Assessment of Brookhaven National Laboratory, June 1990. In addition, the document contains descriptions of the management and organizational structure to be used in conducting planned actions, root causes for the problems identified in the findings, responses, planned actions, schedules and milestones for completing planned actions, and, where known, costs associated with planned actions.

Not Available

1990-08-30T23:59:59.000Z

199

Talk, No Action On Nuclear Waste Plan  

Science Journals Connector (OSTI)

Talk, No Action On Nuclear Waste Plan ... Nowhere was how an exasperated Lt. Gen. Brent Scowcroft, chairman of the Blue Ribbon Commission on Americas Nuclear Future, described the status of the U.S.s search for a place to store spent commercial nuclear fuel and other radioactive waste. ... Although the blue-ribbon commission had completed its seminal report on nuclear waste in January, Scowcroft noted that action on its recommendations was nowhere. ...

JEFF JOHNSON

2012-09-30T23:59:59.000Z

200

Climate Action Plan (Maryland) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maryland) Maryland) Climate Action Plan (Maryland) < Back Eligibility Agricultural Commercial Construction Developer Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Local Government Municipal/Public Utility Nonprofit Retail Supplier Rural Electric Cooperative State/Provincial Govt Systems Integrator Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Maryland Program Type Climate Policies Provider Maryland Department of Natural Resources On April 20, 2007, Governor Martin O'Malley signed Executive Order 01.01.2007.07 establishing the Maryland Climate Change Commission (MCCC) charged with collectively developing an action plan to address the causes

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Climate Action Plan (Kentucky) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kentucky) Kentucky) Climate Action Plan (Kentucky) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Kentucky Program Type Climate Policies Provider Kentucky Department for Energy Development and Independence The Commonwealth of Kentucky established the Kentucky Climate Action Plan

202

Climate Action Plan (Maine) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maine) Maine) Climate Action Plan (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Maine Program Type Climate Policies Provider Department of Environmental Protection In June 2003, the Maine State Legislature passed a bill charging the Department of Environmental Protection (DEP) with developing an action plan

203

Remediation of the Maxey Flats Site  

SciTech Connect

This report describes issues associated with remedial action of Maxey Flats, a low-level radioactive waste disposal site from 1963-1977, located in Fleming County, Kentucky. Present remedial action alternatives being considered are discussed along with emergency plans, ground water monitoring plans, and budgets.

Not Available

1990-01-12T23:59:59.000Z

204

Audit of Groundwater Remediation Plans at Savannah River, ER-B-96-02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIT OF GROUNDWATER REMEDIATION PLANS AT THE SAVANNAH RIVER SITE The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible.

205

NASA Retrospective Plan Progress PENDING ACTIONS  

E-Print Network (OSTI)

Page | 1 NASA Retrospective Plan Progress May 2012 PENDING ACTIONS Agency/Subagency RIN /OMB) Progress updates and anticipated accomplishments Notes 1. NASA/Procurement AD60 NASA Grant and Cooperative Agreement: Change Procedures for Letter of Credit Advance Payments This rule revises the NASA Grant

Waliser, Duane E.

206

Post-Remedial Action Report the Chapman Valve Site E I P I I  

Office of Legacy Management (LM)

for for Post-Remedial Action Report the Chapman Valve Site E I P I I I t I 1 I I I 1 I li I I Pnnted on recycledkecyclable paper 24 19 0186 1 DOE/OW21949-408 Formerly Utilized Sites Remed Contr: al Action Program (FUSRAP) L C t NO. DE-AC05-91 OR21 949 Indian Orchard, assac h.usetts November 1996 DOE/OR/2 1949-408 POST-REMEDIAL ACTION REPORT FOR THE CHAPMAN VALVE SITE INDIAN ORCHARD, MASSACHUSETTS NOVEMBER 1996 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC05-91 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee . . Bechtel Job No. 14501 CONTENTS Page . FIGURES ................................................................................... 1 .............................................................. iv

207

Follow-up inspection of the Formerly Utilized Sites Remedial-Action Program  

SciTech Connect

Corrective actions had been taken in four of the six areas of concern that were addressed in the 1982 report. The remaining two areas are summarized as follows: Certification of Remedial Actions. We found, in the initial inspection, that FUSRAP properties were not being certified as decontaminated in a timely manner following remedial action. This problem has not yet been resolved. The Assistant Secretary for Nuclear Energy acknowledged that the certification process is lengthy but maintained that progress was being made. The Assistant Secretary stated that attempts will be made to speed up the process; and Permanent Waste Disposal. The lack of permanent repositories for FUSRAP wastes continues to be a major issue. The Assistant Secretary for Nuclear Energy indicated to us that meetings are being held with state and congressional representatives to impress on them the need for locating disposal sites for FUSRAP wastes in their states.

Not Available

1983-10-19T23:59:59.000Z

208

Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste fadities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCIA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RIFA)/RCRA Facility Investigation (RFI)/Coffective Measures Study (CMS)/Corrective Measures Implementation process. Under CERCLA, the actions follow the Pre@ary Assessment/Site Investigation (PA/Sl) Remedial Investigation Feasibility Study (RI/FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCIA into an RI Work Plan for the lint phase of characterization of Bear Creek Valley (BCV) Operable Unit (OU) 4.

Not Available

1992-12-01T23:59:59.000Z

209

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Construction Quality Assurance Plan Construction Quality Assurance Plan This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page H-1 Construction Quality Assurance Plan 1.1 Introduction This Construction Quality Assurance Plan supports the implementation of remedial activities at LEHR covered by the Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis. This plan is consistent with and supplements the requirements of the Quality Assurance Project Plan and quality assurance elements covered in Section 7 of the Remedial Design/Remedial Action Work Plan. 1.2 Distribution This plan shall be distributed with the Remedial Design/Remedial Action Work Plan to all

210

Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project  

SciTech Connect

This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.

Bachrach, A.; Hoopes, J.; Morycz, D. (Jacobs Engineering Group, Inc., Pasadena, CA (USA)); Bone, M.; Cox, S.; Jones, D.; Lechel, D.; Meyer, C.; Nelson, M.; Peel, R.; Portillo, R.; Rogers, L.; Taber, B.; Zelle, P. (Weston (Roy F.), Inc., Washington, DC (USA)); Rice, G. (Sergent, Hauskins and Beckwith (USA))

1984-12-01T23:59:59.000Z

211

Records Management in the Formerly Used Sites Remedial Action Program (FUSRAP)  

SciTech Connect

The U.S. Army Corps of Engineers' (USACE's) performance of site investigation and remediation under the Formerly Used Sites Remedial Action Program (FUSRAP) requires the use of a records management system in order to effectively capture and manage data, document the decision making process, and allow communication of project information to regulators, congress, and the public. The USACE faces many challenges in managing the vast amount of data, correspondence, and reports generated under this program, including: management of data and reports in a variety of paper, electronic, and microfilm formats; incorporation of records generated by the Department of Energy (DOE) prior to 1997; ensuring smooth flow of information among numerous internal Project Managers and regulators; and facilitating public access to information through the development of CERCLA Administrative Records and response to Freedom of Information Act (FOIA) requests. In 2004-2005, the USACE Buffalo District contracted with Dynamac Corporation to adapt the records management system developed for the Formerly Used Defense Sites (FUDS) Program to the records for the Luckey and Painesville FUSRAP sites. The system, known as the FUDS Information Improvement Plan (FIIP), was jointly developed by the USACE Hazardous, Toxic, and Radioactive Waste Center of Expertise (HTRW-CX), USACE Rock Island District, and several FUDS contractors (including Dynamac Corporation) in 2003. The primary components of the FIIP which address the challenges faced by the FUSRAP Program include: the development of a standardized document organization system; the standardization of electronic conversion processes; the standardization of file naming conventions; and the development of an automated data capture system to speed the process and reduce errors in indexing. The document organization system allows for the assignment of each individual document to one of approximately 150 categories. The categories are based upon a combination of the USACE site approval process and the CERCLA process. Documents are assigned to categories based on their relevance to the approval of the site, historical or reference content, and generation during a phase of the investigation and remediation process. Within each category relevant to a CERCLA phase, sub-categories exist to allow for the organization of correspondence, data, work plans, contracting information, technical reports, decision documents, and other associated documentation. The electronic conversion system was developed by USACE to standardize the types of electronic files maintained on the USACE Project Information Retrieval System (PIRS). Prior to standardization, PIRS had been populated with hundreds of thousands of electronic files of various incompatible types, making systematic search and retrieval impossible. By dictating the use of PDF files with standardized specifications, USACE ensured that all files were in the same format, and that the format is universally searchable and retrievable by probable users of the system. Similarly, the implementation of standardized file names, based on a combination of the site name, organization category, and a unique sequence number, facilitates linking of the individual files to indexing and search functions. To automate the entire process, Dynamac developed a Document Management Database, which was adapted to the FUSRAP Program for the Luckey and Painesville sites. Prior to the use of a database, capture of document titles, authors, dates, organization category, and other information was done manually, taking substantial time and leading to numerous errors. The database, developed in Microsoft Access format, facilitates the speed of the data entry and reduces errors by building drop-down menus during the data entry process. For instance, once an author and their affiliation are entered once, the name and affiliation can be retrieved by entering the beginning of the character string, or choosing the name from the drop-down list. For projects involving the management of tens of thousands of docum

Morekas, G.N.; Pape, M.B. [Dynamac Corporation, 2275 Research Boulevard, Suite 300, Rockville, MD 20850 (United States)

2006-07-01T23:59:59.000Z

212

Hiring Reform Memoranda and Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0585 0585 October 7, 2010 MEMORANDUM FOR HEADS OF ALL DEPARTMENTAL ELEMEI\lTS HUMAI\l RESOURCES DIRECTORS FROM: MICHAELC. KANE~~~ CHIEF HUMAN CAPITAL ~ c· SUBJECT: IMPROVING DOE RECRUITMENT AND HIRING PROCESSES This is a follow-up to the Deputy Secretary's Memorandum dated October 6, 2010 where he communicated the need to implement the Action Plan developed to improve the recruitment and hiring processes throughout the Department. One of the central tenets of the President's reform efforts and the Department's Action Plan is management's commitment and attention to an efficient and effective hiring process that yields quality employees. This was clearly articulated in the President's Memorandum dated May 11, 2010 where he directed that management be held accountable through the performance evaluation system for their role

213

EA-1508: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

508: Mitigation Action Plan 508: Mitigation Action Plan EA-1508: Mitigation Action Plan Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld Counties, Colorado This is the mitigation action plan (MAP) for use during construction of the Beaver Creek-Hoyt-Erie transmission line upgrades, including right-of ways (ROWS), hydrology, vegetation, construction debris and dewatering, landscape engineering, borrow pits and recommended procedures for Raptors and powerline construction. Mitigation Action Plan to Implement Mitigation Requirements for Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld Counties, Colorado November 2005 More Documents & Publications EA-1617: Mitigation Action Plan EA-1456: Mitigation Action Plan EA-1611: Mitigation Action Plan

214

EIS-0380: Annual Mitigation Action Plan Annual Report  

Energy.gov (U.S. Department of Energy (DOE))

Los Alamos National Laboratory Site-Wide Environmental Impact Statement Fiscal Year 2013 Mitigation Action Plan Annual Report

215

Tank waste remediation system privatization phase 1 infrastructure project, systems engineering implementation plan  

SciTech Connect

This Systems Engineering Implementation Plan (SEIP) describes the processes, products, and organizational responsibilities implemented by Project W-519 to further define how the project`s mission, defined initially by the Tank Waste Remediation System Phase 1 Privatization Infrastructure Project W-503 Mission Analysis Report (Hoertkorn 1997), will be accomplished using guidance provided by the Tank Waste Remediation System Systems Engineering Management Plan (SEMP) (Peck 1998). This document describes the implementation plans for moving from a stated mission to an executable cost, schedule, and technical baseline and to help ensure its successful completion of those baselines.

Schaus, P.S.

1998-08-19T23:59:59.000Z

216

DOE/EV-0005/10 Formerly Utilized MED/AEC Sites Remedial Action Program  

Office of Legacy Management (LM)

0 0 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Former Horizons Inc., Metal Handling Facility, Cleveland, Ohio February 1979 - Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology DOE/EV-0005/10 UC-70 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Former Horizons Inc., Metal Handling Facility, Cleveland, Ohii February 1979 Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology Washington, D.C. 20545 Under Contract No. W-7405-ENG-26 By the Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 Available from: National Technical Information Service (NTIS)

217

DOE/EV-0005/19 Formerly Utilized MED/AEC Sites Remedial Action Program  

Office of Legacy Management (LM)

9 9 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Building Site 421, United States Watertown Arsenel, Watertown, MA February 1980 . Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology ~--.. _..-- DOE/EV-0005/19 UC-70 Formerly Utilized MED/AEC Sites Remedial Action Program Radiologidal Survey of the Building Site 421, United States Watertown Arsenel, Watertown, MA February 1980 Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology Washington, D.C. 20545 by Argonne National Laboratory Argonne, Illinois 60439 Under Contract No. W-31-1 09-ENG-38 -- _.. .-___

218

Z-LJQ- Formerly Utilized MED/AEC Sites Remedial Action Program  

Office of Legacy Management (LM)

lOE/EV-0005/9 lOE/EV-0005/9 Z-LJQ- Formerly Utilized MED/AEC Sites Remedial Action Program Radiologicd Survey of the Former GSA 39th Street Warehouse 1716 Pershing Road, Chicago, Illinois January 1979 . Final Report Prepared for: U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology ' !. & .~~"I__ _ -..- ~-. _...-. DO E/EV-0005/g UC-70 Formerly Utilized MED/AEC Sites Remedial Action Program Radiologicd Survey of the Former GSA 39th Street Warehouse 1716 Pershing Road, Chicago, Illinois January 1979 Final Report Prepared for: U.S. Department of Energy Assistant Secretary for Environmen\ Division of Environmental Control Technology Washington, D.C. 20545 Under Contract W-31 -109-ENG-38 By the Argonne National Laboratory

219

DOE/EV-0005/16 Formerly Utilized MED/AEC Sites Remedial Action Program  

Office of Legacy Management (LM)

6 6 Formerly Utilized MED/AEC Sites Remedial Action Program Radic&@cal Survey of the St. Louis Airport Storage Site, St. Louis, Missouri September 1979 Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology .__ -. __ ..- -- DOE/EV-0005/16 UC-70 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the St. Louis Airport Storage Site, St. Louis, Missouri September 1979 Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology Washington, D.C. 20545 by Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 Under Contract No. W-7405-ENG-26 .--__ _ .- _--- _ ~- Available from:

220

OE/EV-0005/2 Formerly Utilized MED/AEC Sites Remedial Action Program  

Office of Legacy Management (LM)

OE/EV-0005/2 OE/EV-0005/2 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Hooker Chemical Company Niagara Falls, New York January 1977 Final Report Prepared for U.S. Department of Energy Division of Environmental Control Technology Washington, D.C. 20545 DOE/EV-0005/2 UC-70 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Hooker Chemical Company Niagara Falls, New York January 1977 Final Report Prepared for U.S. Department of Energy Division of Environmental Control Technology Washing-ton, D.C. 20545 Under Contract No. W-7405-ENE-26 Oak Ridge National Laboratory Oak Ridge, Tennessee 3783C NOTICE This report was prepared as an account of work sponsored by the United States Government. Neither the United States nor the United

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

DOE/EV-0005/11 Formerly Utilized M.ED/AEC Sites Remedial Action Program  

Office of Legacy Management (LM)

1 1 Formerly Utilized M.ED/AEC Sites Remedial Action Program Radidogical Survey of the Seneca Army Depot Romulus, New York February 1979 Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology : E 1 bOE/EV-0005/11 UC-70 Formerly Utilized MEDIAEC Sites Remedial Action Program Radidogical Survey of the Seneca Army Depot Romulus, New York February 1979 Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology Washington, D.C. 20545 Under Contract No. W-7405-ENG-26 By the Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 Available from: National Technical Information Service (NTIS) U.S. Department of Comrqerce

222

DOE/EV-0005/15 Formerly Utilized MED/AEC Sites Remedial Action Program  

Office of Legacy Management (LM)

5 5 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Bayo Canyon, Los Alamos, New Mexico June 1979 Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology DOE/EV-0005/15 UC-71 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Bayo Canyon, Los Alamos, New Mexico June 1979 Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Division of Environmental Control Technology Washington, D.C. 20545 by Los Alamos Scientific Laboratory Los Alamos, New Mexico 87545 Under Contract No. W-7405-ENG-36 Available from: National Technical Information Service (NTIS) U.S. Department of Commerce 5285 Port Royal Road Springfield, Virginia 22161

223

Retrospection of Chernobyl nuclear accident for decision analysis concerning remedial actions in Ukraine  

SciTech Connect

It is considered the efficacy of decisions concerning remedial actions when of-site radiological monitoring in the early and (or) in the intermediate phases was absent or was not informative. There are examples of such situations in the former Soviet Union where many people have been exposed: releases of radioactive materials from 'Krasnoyarsk-26' into Enisey River, releases of radioactive materials from 'Chelabinsk-65' (the Kishtim accident), nuclear tests at the Semipalatinsk Test Site, the Chernobyl nuclear accident etc. If monitoring in the early and (or) in the intermediate phases is absent the decisions concerning remedial actions are usually developed on the base of permanent monitoring. However decisions of this kind may be essentially erroneous. For these cases it is proposed to make retrospection of radiological data of the early and intermediate phases of nuclear accident and to project decisions concerning remedial actions on the base of both retrospective data and permanent monitoring data. In this Report the indicated problem is considered by the example of the Chernobyl accident for Ukraine. Their of-site radiological monitoring in the early and intermediate phases was unsatisfactory. In particular, the pasture-cow-milk monitoring had not been made. All official decisions concerning dose estimations had been made on the base of measurements of {sup 137}Cs in body (40 measurements in 135 days and 55 measurements in 229 days after the Chernobyl accident). For the retrospection of radiological data of the Chernobyl accident dynamic model has been developed. This model has structure similar to the structure of Pathway model and Farmland model. Parameters of the developed model have been identified for agricultural conditions of Russia and Ukraine. By means of this model dynamics of 20 radionuclides in pathways and dynamics of doses have been estimated for the early, intermediate and late phases of the Chernobyl accident. The main results are following: - During the first year after the Chernobyl accident 75-93% of Commitment Effective Dose had been formed; - During the first year after the Chernobyl accident 85-90% of damage from radiation exposure had been formed. During the next 50 years (the late phase of accident) only 10-15% of damage from radiation exposure will have been formed; - Remedial actions (agricultural remedial actions as most effective) in Ukraine are intended for reduction of the damage from consumption of production which is contaminated in the late phase of accident. I.e. agricultural remedial actions have been intended for minimization only 10 % of the total damage from radiation exposure; - Medical countermeasures can minimize radiation exposure damage by an order of magnitude greater than agricultural countermeasures. - Thus, retrospection of nuclear accident has essentially changed type of remedial actions and has given a chance to increase effectiveness of spending by an order of magnitude. This example illustrates that in order to optimize remedial actions it is required to use data of retrospection of nuclear accidents in all cases when monitoring in the early and (or) intermediate phases is unsatisfactory. (author)

Georgievskiy, Vladimir [Russian Research Center 'Kurchatov Insitute', Kurchatov Sq., 1, 123182 Moscow (Russian Federation)

2007-07-01T23:59:59.000Z

224

International action plan on the radiation protection of patients  

Science Journals Connector (OSTI)

......implementation of the Action Plan, and to make proposals...The steering panel reviews progress and makes additional...International Action Plan on the Radiation Protection...financial base or have a regulatory requirement to produce...International action plan for the radiological......

Madan M. Rehani; Ola Holmberg; Pedro Ortiz Lpez; Fred Mettler

2011-09-01T23:59:59.000Z

225

(This page intentionally left blank.) Corrective Action Plan  

E-Print Network (OSTI)

: Radiation Protection....................................................................34 Finding C4#12;(This page intentionally left blank.) #12;#12;#12;Corrective Action Plan to the Independent line from "Develop plan to communicate action D1-3" to "Develop plan to communicate action D1-2" 4

226

Audit of Selected Hazardous Waste Remedial Actions Program Costs, ER-B-97-04  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. DEPARTMENT OF ENERGY U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL AUDIT OF SELECTED HAZARDOUS WASTE REMEDIAL ACTIONS PROGRAM COSTS The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov

227

Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project  

SciTech Connect

This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document.

none,

1992-12-31T23:59:59.000Z

228

EIS-0117: Remedial Action at the Weldon Spring Site (also see EIS-0185)  

Energy.gov (U.S. Department of Energy (DOE))

This EIS analyzes the alternatives for the long-term management of wastes associated with remedial action activities at the Weldon Spring site, located about 48 km (30 mi ) west of St. Louis, Missouri. The site is currently contaminated as the result of processing of uranium, thorium, and other materials previously carried out at the site. The Weldon Spring site consists of four areas: raffinate pits, quarry, chemical plant , and vicinity properties.

229

Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado: Revision 5  

SciTech Connect

Title 1 of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the inactive Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. Title 2 of the UMTRCA authorized the US Nuclear Regulatory Commission (NRC) or agreement state to regulate the operation and eventual reclamation of active uranium processing sites. The uranium mill tailings at the site were removed and reprocessed from 1977 to 1979. The contaminated areas include the former tailings area, the mill yard, the former ore storage area, and adjacent areas that were contaminated by uranium processing activities and wind and water erosion. The Naturita remedial action would result in the loss of 133 acres (ac) of contaminated soils at the processing site. If supplemental standards are approved by the NRC and the state of Colorado, approximately 112 ac of steeply sloped contaminated soils adjacent to the processing site would not be cleaned up. Cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers.

Not Available

1994-10-01T23:59:59.000Z

230

Develop an Institutional Change Action Plan for Sustainability | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Develop an Institutional Change Action Plan for Sustainability Develop an Institutional Change Action Plan for Sustainability Develop an Institutional Change Action Plan for Sustainability October 8, 2013 - 11:50am Addthis Graphic showing 5 gears. They progress from Determine Goal to Identify Context-Rules, Roles and Tools to Develop Action Plan to Implement Plan to Measure and Evaluate. Institutional Change Continuous Improvement Cycle After establishing a goal and assessing the rules, roles, and tools, Federal agencies can develop an action plan (select the strategies that will be implemented over time to achieve and maintain energy and sustainability goals). This action plan should target specific audiences with tailored strategies and take into account the need to review and revise strategies in the long-term. The action plan must include appropriate metrics and regular

231

Implement an Institutional Change Action Plan for Sustainability |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implement an Institutional Change Action Plan for Sustainability Implement an Institutional Change Action Plan for Sustainability Implement an Institutional Change Action Plan for Sustainability October 8, 2013 - 11:54am Addthis Graphic showing 5 gears. They progress from Determine Goal to Identify Context-Rules, Roles and Tools to Develop Action Plan to Implement Plan to Measure and Evaluate. Institutional Change Continuous Improvement Cycle Writing a good action plan is one thing; implementing it is another. Institutional change principles and methods can be incorporated into action plans (program design), but on-the-ground implementation activities must also be conducted in a manner that is suitable to the organizational context and the people in the roles being targeted. Action plans lay out the set of strategies a Federal agency will roll out

232

Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 13: Part 2, Indexes. Environmental Restoration Program  

SciTech Connect

This is part 2 of a bibliography on nuclear facility decommissioning and site remedial action. This report contains indexes on the following: authors, corporate affiliation, title words, publication description, geographic location, subject category, and key word.

Goins, L.F.; Webb, J.R.; Cravens, C.D.; Mallory, P.K.

1992-09-01T23:59:59.000Z

233

Lessons Learned: Creating the Chicago Climate Action Plan | Open Energy  

Open Energy Info (EERE)

Lessons Learned: Creating the Chicago Climate Action Plan Lessons Learned: Creating the Chicago Climate Action Plan Jump to: navigation, search Name Lessons Learned: Creating the Chicago Climate Action Plan Agency/Company /Organization City of Chicago Partner Global Philanthropy Partnership, ICLEI Focus Area Buildings, Energy Efficiency - Central Plant, Greenhouse Gas, Other, Non-renewable Energy, Transportation, Renewable Energy Phase Create a Vision, Determine Baseline, Develop Goals, Prepare a Plan, Get Feedback, Create Early Successes Topics Low emission development planning Resource Type Lessons learned/best practices Availability Free Publication Date 6/1/2008 Website http://www.chicagoclimateactio Locality Chicago, IL References Lessons Learned: Creating the Chicago Climate Action Plan[1] Overview

234

National Action Plan on Demand Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

David Kathan, Ph.D David Kathan, Ph.D Federal Energy Regulatory Commission U.S. DOE Electricity Advisory Committee October 29, 2010 Demand Response as Power System Resources The author's views do not necessarily represent the views of the Federal Energy Regulatory Commission 2 Demand Response * FERC (Order 719) defines demand response as: - A reduction in the consumption of electric energy by customers from their expected consumption in response to an increase in the price of electric energy or to in incentive payments designed to induce lower consumption of electric energy. * The National Action Plan on Demand Response released by FERC staff broadens this definition to include - Consumer actions that can change any part of the load profile of a utility or region, not just the period of peak usage

235

DOE responses to CDH October 1993 comments on the Remedical Action Plan for the Naturita, Colorado, Umtra Site  

SciTech Connect

This document includes the October 1993 comments provided by the Colorado Department of Health (CDH) on the Department of Energy (DOE) Preliminary Final Remedial Action Plan for the Naturita, Colorado, UMTRA Site. DOE`s responses are included after each CDH comment.

NONE

1996-10-01T23:59:59.000Z

236

Sustainable Energy Action Plans: Project Management Intercomparison  

Science Journals Connector (OSTI)

Abstract This paper explores the content of various Sustainable Energy Action Plans (SEAPs) necessary to the Covenant of Mayors. This study has the aim of providing an overview of existing methodologies for the development and implementation of \\{SEAPs\\} by municipalities. As the number and complexity of issues related with energy are very broad, it is very important to know and identify good practices and guidelines to increasing participant municipalities. Based on the methodologies collected in several studies, it is possible to identify key aspects and issues municipalities might consider for the development of their own plan. The SEAP cant be only a collection of measures; it must have a coherent strategy with the European and National policies. This study also shows that a good coordinator with project management skills is necessary to overcome obstacles due to the lack of communication or collaboration among the different municipality's departments.

Eurico Vasco Amorim

2014-01-01T23:59:59.000Z

237

Climate Action Plan (Massachusetts) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Massachusetts) Massachusetts) Climate Action Plan (Massachusetts) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Massachusetts Program Type Climate Policies In August 2008, Governor Deval Patrick signed into law the Global Warming Solutions Act (GWSA), making Massachusetts one of the first states in the

238

Climate Action Plan (Virginia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Virginia) Virginia) Climate Action Plan (Virginia) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Virginia Program Type Climate Policies Provider Virginia Department of Environmental Qualiry Governor Timothy M. Kaine established the Governor's Commission on Climate

239

Climate Action Plan (Vermont) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vermont) Vermont) Climate Action Plan (Vermont) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Vermont Program Type Climate Policies Provider Vermont Agency of Natural Resources There is a growing scientific consensus that increasing emissions of greenhouse gases to the atmosphere are affecting the temperature and

240

Climate Action Plan (Connecticut) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Connecticut) Connecticut) Climate Action Plan (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Connecticut Program Type Climate Policies Provider Department of Energy and Environmental Protection Connecticut's climate change initiative is led and directed by the

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Climate Action Plan (Arkansas) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Arkansas) Arkansas) Climate Action Plan (Arkansas) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Solar Wind Program Info State Arkansas Program Type Climate Policies With the signing of Act 696 of the Arkansas 86th General Assembly (HB2460), Governor Mike Beebe established the Governor's Commission on Global

242

Climate Action Plan (Florida) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Florida) Florida) Climate Action Plan (Florida) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Florida Program Type Climate Policies On July 12 and 13, 2007, Governor Charlie Crist hosted "Serve to Preserve: A Florida Summit on Global Climate Change." The summit brought

243

Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program -12184  

SciTech Connect

The U. S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collection adequately described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS&M) program: ? Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. ? DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. ? DOE must continue to maintain constructive relationships with the U.S. Army Corps of Engineers and state and federal regulators.

Clayton, Christopher [U.S Department of Energy Office of Legacy Management, Washington, DC; Kothari, Vijendra [U.S Department of Energy Office of Legacy Management, Morgantown, West Virginia; Starr, Ken [U.S Department of Energy Office of Legacy Management, Westminster, Colorado; Widdop, Michael; Gillespie, Joey [SM Stoller Corporation, Grand Junction, Colorado

2012-02-26T23:59:59.000Z

244

National Action Plan on Demand Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 ACTUAL FORECAST National Action Plan on Demand Response the feDeRal eneRgy RegulatoRy commission staff 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 12 6 3 9 National Action Plan on Demand Response THE FEDERAL ENERGY REGULATORY COMMISSION STAFF June 17, 2010 Docket No. AD09-10 Prepared with the support of The Brattle Group * GMMB * Customer Performance Group Definitive Insights * Eastern Research Group The opinions and views expressed in this staff report do not necessarily represent those of the Federal Energy Regulatory Commission, its Chairman, or individual Commissioners, and are not binding on the Commission.

245

Develop an Institutional Change Action Plan for Sustainability  

Energy.gov (U.S. Department of Energy (DOE))

After establishing a goal and assessing the rules, roles, and tools, Federal agencies can develop an action plan (select the strategies that will be implemented over time to achieve and maintain energy and sustainability goals). This action plan should target specific audiences with tailored strategies and take into account the need to review and revise strategies in the long-term. The action plan must include appropriate metrics and regular measurement. Remember that planning useful efficiency and sustainability evaluation is necessary before an organization begins to implement an action plan.

246

Remediation of the Maxey Flats Site. Final report  

SciTech Connect

This report describes issues associated with remedial action of Maxey Flats, a low-level radioactive waste disposal site from 1963-1977, located in Fleming County, Kentucky. Present remedial action alternatives being considered are discussed along with emergency plans, ground water monitoring plans, and budgets.

Not Available

1990-01-12T23:59:59.000Z

247

Clean slate corrective action investigation plan  

SciTech Connect

The Clean Slate sites discussed in this report are situated in the central portion of the Tonopah Test Range (TTR), north of the Nevada Test Site (NTS) on the northwest portion of the Nellis Air Force Range (NAFR) which is approximately 390 kilometers (km) (240 miles [mi]) northwest of Las Vegas, Nevada. These sites were the locations for three of the four Operation Roller Coaster experiments. These experiments evaluated the dispersal of plutonium in the environment from the chemical explosion of a plutonium-bearing device. Although it was not a nuclear explosion, Operation Roller Coaster created some surface contamination which is now the subject of a corrective action strategy being implemented by the Nevada Environmental Restoration Project (NV ERP) for the U.S. Department of Energy (DOE). Corrective Action Investigation (CAI) activities will be conducted at three of the Operation Roller Coaster sites. These are Clean Slate 1 (CS-1), Clean Slate 2 (CS-2), and Clean Slate 3 (CS-3) sites, which are located on the TTR. The document that provides or references all of the specific information relative to the various investigative processes is called the Corrective Action Investigation Plan (CAIP). This CAIP has been prepared for the DOE Nevada Operations Office (DOE/NV) by IT Corporation (IT).

NONE

1996-05-01T23:59:59.000Z

248

SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning  

E-Print Network (OSTI)

Planning Tools from Morehead A Word about Morehead's Workforce Commitment Model Technical Support Section 2 Activities Appendices Appendix 1 ­ Workforce Commitment Domains Summary Appendix 2 ­ Action Plan Form #12SURVEY LEADERSHIP The Manager's Guide to Survey Feedback & Action Planning A guide designed to help

Squire, Larry R.

249

Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory  

SciTech Connect

This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

1993-07-01T23:59:59.000Z

250

Tank Waste Remediation System Tank Waste Analysis Plan. FY 1995  

SciTech Connect

This documents lays the groundwork for preparing the implementing the TWRS tank waste analysis planning and reporting for Fiscal Year 1995. This Tank Waste Characterization Plan meets the requirements specified in the Hanford Federal Facility Agreement and Consent Order, better known as the Tri-Party Agreement.

Haller, C.S.; Dove, T.H.

1994-11-01T23:59:59.000Z

251

FORMERLY UTILIZED SITES REMEDIAL ACTION PROGRAM ELIMINFA;RIOflH;EPORT  

Office of Legacy Management (LM)

ELIMINFA;RIOflH;EPORT ELIMINFA;RIOflH;EPORT FORMER ELECTRO METALLURGICAL COMPANY NIAGARA FALLS, NEW YORK U.S. DEPARTMENT OF ENERGY OFFICE OF NUCLEAR ENERGY OFFICE OF REMEDIAL ACTION AND WASTE TECHNOLOGY DIVISION OF FACILITY AND SITE DECOMMISSIONING PROJECTS CONTENTS INTRODUCTION BACKGROUND Site Function Site Description Radiological History and Status ELIMINATION ANALYSIS SUMMARY OF FINDINGS REFERENCES Page 1 : 3 5 7 8 ELIMINATION REPORT FORMER ELECTRO METALLURGICAL COMPANY NIAGARA FALLS, NEW YORK INTRODUCTION From 1942 through 1953, the Electra Metallurgical' Company ("Electromet"), a subsidiary of Union Carbide and Carbon Corporation (now Umetco Minerals Corporation, a subsidiary of Union Carbide Corporation) performed work with radioactive materials under contract to the Manhattan

252

EIS-0128: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28: Mitigation Action Plan 28: Mitigation Action Plan EIS-0128: Mitigation Action Plan Los Banos - Gates (Path 15) Transmission Project, Revision 2 Revision 2: This MAP addresses the construction, operation, and maintenance of the new 84-mile long 500-kV transmission line. Necessary work conducted by Pacific Gas and Electric (PG&E) at their substations will occur within the previously disturbed area inside the substation boundaries. Western or Trans Electric, Inc. will also not have a role in upgrading the various existing PG&E 230-kV system components. DOE-0128-MAP-02, Western Area Power Administration, Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project, Revision 2 (December 2003) More Documents & Publications EIS-0128: Mitigation Action Plan EA-1456: Mitigation Action Plan

253

EA-1591: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

91: Mitigation Action Plan 91: Mitigation Action Plan EA-1591: Mitigation Action Plan Palisades-Goshen Transmission Line Reconstruction Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Palisades-Goshen Transmission Line Reconstruction Project. The project involves reconstruction of the existing Palisades-Goshen 115-kV transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. Mitigation Action Plan for the Palisades-Goshen Transmission Line Reconstruction Project More Documents & Publications EA-1591: Final Environmental Assessment, Finding of No Significant Impact, and Mitigation Action Plan EA-1591: Finding of No Significant Impact

254

Argentina-Mitigation Action Plans and Scenarios (MAPS) | Open Energy  

Open Energy Info (EERE)

Argentina-Mitigation Action Plans and Scenarios (MAPS) Argentina-Mitigation Action Plans and Scenarios (MAPS) Jump to: navigation, search Logo: Argentina-Mitigation Action Plans and Scenarios (MAPS) Name Argentina-Mitigation Action Plans and Scenarios (MAPS) Agency/Company /Organization The Children's Investment Fund Foundation, SouthSouthNorth, University of Cape Town-Energy Research Centre, Danish Government Sector Climate, Energy Topics Baseline projection, Low emission development planning, -LEDS, -NAMA, Pathways analysis Website http://www.mapsprogramme.org Program Start 2010 Program End 2013 Country Argentina South America References Mitigation Action Plans and Scenarios (MAPS)[1] Contents 1 Overview 2 MAPS Processes and Outcomes 2.1 Chile 2.2 Colombia 2.3 Peru 2.4 Brazil 2.5 Resources 2.5.1 Mitigation Action Country Studies

255

Colombia-Mitigation Action Plans and Scenarios (MAPS) | Open Energy  

Open Energy Info (EERE)

Colombia-Mitigation Action Plans and Scenarios (MAPS) Colombia-Mitigation Action Plans and Scenarios (MAPS) Jump to: navigation, search Logo: Colombia-Mitigation Action Plans and Scenarios (MAPS) Name Colombia-Mitigation Action Plans and Scenarios (MAPS) Agency/Company /Organization The Children's Investment Fund Foundation, SouthSouthNorth, University of Cape Town-Energy Research Centre, Danish Government Sector Climate, Energy Topics Baseline projection, Low emission development planning, -LEDS, -NAMA, Pathways analysis Website http://www.mapsprogramme.org Program Start 2010 Program End 2013 Country Colombia South America References Mitigation Action Plans and Scenarios (MAPS)[1] Contents 1 Overview 2 MAPS Processes and Outcomes 2.1 Chile 2.2 Colombia 2.3 Peru 2.4 Brazil 2.5 Resources 2.5.1 Mitigation Action Country Studies

256

Brazil-Mitigation Action Plans and Scenarios (MAPS) | Open Energy  

Open Energy Info (EERE)

Brazil-Mitigation Action Plans and Scenarios (MAPS) Brazil-Mitigation Action Plans and Scenarios (MAPS) Jump to: navigation, search Logo: Brazil-Mitigation Action Plans and Scenarios (MAPS) Name Brazil-Mitigation Action Plans and Scenarios (MAPS) Agency/Company /Organization The Children's Investment Fund Foundation, SouthSouthNorth, University of Cape Town-Energy Research Centre, Danish Government Sector Climate, Energy Topics Baseline projection, Low emission development planning, -LEDS, -NAMA, Pathways analysis Website http://www.mapsprogramme.org Program Start 2010 Program End 2013 Country Brazil South America References Mitigation Action Plans and Scenarios (MAPS)[1] Contents 1 Overview 2 MAPS Processes and Outcomes 2.1 Chile 2.2 Colombia 2.3 Peru 2.4 Brazil 2.5 Resources 2.5.1 Mitigation Action Country Studies

257

EIS-0128: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: Mitigation Action Plan : Mitigation Action Plan EIS-0128: Mitigation Action Plan Los Banos - Gates (Path 15) Transmission Project, Revision 2 Revision 2: This MAP addresses the construction, operation, and maintenance of the new 84-mile long 500-kV transmission line. Necessary work conducted by Pacific Gas and Electric (PG&E) at their substations will occur within the previously disturbed area inside the substation boundaries. Western or Trans Electric, Inc. will also not have a role in upgrading the various existing PG&E 230-kV system components. DOE-0128-MAP-02, Western Area Power Administration, Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project, Revision 2 (December 2003) More Documents & Publications EIS-0128: Mitigation Action Plan EA-1456: Mitigation Action Plan

258

Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 1, Text: Final environmental impact statement  

SciTech Connect

This statement evaluates and compares the environmental impacts associated with the remedial actions of the residual radioactive materials remaining at the inactive uranium processing site and associated vicinity properties at Grand Junction, Mesa County, Colorado. This statement is also intended to aid the BLM in amending their management framework plans and final resource management plan, as well as assisting in compliance with the withdrawal application as appropriate. The site is a 114-acre tract of private and state owned land which contains approximately 3.1 million cubic yards of tailings and associated contaminated soils. The vicinity properties are homes, businesses, public buildings, and vacant lots which may have been contaminated during construction by the use of tailings as building material. An estimated 3465 vicinity properties would be cleaned up during remedial action of the tailings pile. The tailings were produced by the former Climax Uranium Company which processed uranium ore, which it sold to the US Atomic Energy Commission from 1951 to 1966 and to private sources from 1966 to 1970. This statement evaluates six alternatives for stabilization and disposal of the tailings and other contaminated materials: (1) No action. (2) Stabilization at the Grand Junction site. (3) Disposal at the Cheney Reservoir site with truck transport. (4) Disposal at the Cheney Reservoir site with train and truck transport. (5) Disposal at the Two Road site with truck transport. (6) Disposal at the Two Road site with train and truck transport. All of the alternatives except no action include remedial action at an estimated 3465 vicinity properties. Alternative 3 is DOE`s preferred alternative.

None

1986-12-01T23:59:59.000Z

259

Virginia Tech Climate Action Commitment and Sustainability Plan  

E-Print Network (OSTI)

of Architecture & Urban Studies Angella De Soto * Undergraduate Student Sustainability Intern, Environmental 0 Virginia Tech Climate Action Commitment and Sustainability Plan Energy & Sustainability Committee April 22, 2009 #12; 1 ACKNOWLEDGEMENTS VIRGINIA TECH CLIMATE ACTION COMMITMENT

Buehrer, R. Michael

260

Feasibility study for remedial action for the Quarry Residuals Operable Unit at the Weldon Spring Site, Weldon Spring, Missouri  

SciTech Connect

The U.S. Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, which is located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis (Figure 1.1). Cleanup of the Weldon Spring site consists of several integrated components. The quarry residuals operable unit (QROU) is one of four operable units being evaluated. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, a remedial investigation/feasibility study (RI/FS) is being conducted to evaluate conditions and potential responses for the following areas and/or media that constitute the QROU: (1) the residual material (soil and sediment) remaining at the Weldon Spring quarry after removal of the bulk waste (about 11 million L [3 million gal] of uranium-contaminated ponded water was also addressed previous to bulk waste removal); (2) other media located in the surrounding vicinity of the quarry, including adjacent soil, surface water, and sediment in Femme Osage Slough and several creeks; and (3) quarry groundwater located primarily north of Femme Osage Slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of QROU RI/FS evaluations. For remedial action sites, it is DOE policy to integrate values associated with the National Environmental Policy Act (NEPA) into the CERCLA decision-making process. The analyses contained herein address NEPA values as appropriate to the actions being considered for the QROU. A work plan summarizing initial site conditions and providing conceptual site hydrogeological and exposure models was published in January 1994. The RI and baseline risk assessment (BRA) reports have been completed. The RI discusses in detail the nature and extent and the fate and transport of contamination at the quarry area.

NONE

1998-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Climate Action Plan (Delaware) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delaware) Delaware) Climate Action Plan (Delaware) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Delaware Program Type Climate Policies Provider Delaware Division of Energy and Climate To better understand the current and future vulnerabilities and risks to climate change, DNREC Secretary Collin O'Mara directed the Division of

262

Microsoft Word - Mitigation Action Plan.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

782 782 MITIGATION ACTION PLAN FOR THE UNIVERSITY OF DELAWARE LEWES CAMPUS ONSITE WIND ENERGY PROJECT DECEMBER 2010 U.S. Department of Energy Office of Energy Efficiency and Renewable Energy 1000 Independence Avenue, SW Washington, D.C. 20585 1.0 INTRODUCTION The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA) to aid its decision whether to provide funding for the University of Delaware's construction and operation of a 2-megawatt wind turbine adjacent to the University's College of Earth, Ocean, and Environment Campus in Lewes, Delaware. The EA (DOE/EA-1782) for the University's Wind Energy Project was completed in compliance with the National Environmental Policy Act (NEPA) and implementing regulations issued by the Council on Environmental Quality and

263

EA-1592: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1592: Mitigation Action Plan Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the NNSA's Kansas City Plant Based on the analysis in the Environmental Assessment prepared for the proposal by the GSA and NNSA, neither the construction nor operation of the selected alternative wouldhave significant environmental impact. This MAP contains mitigation and monitoring commitments for the project, including commitments set in permits for the new facility. Mitigation Action Plan for the Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the NNSA's Kansas City Plant More Documents & Publications EA-1592: Finding of No Significant Impact

264

EA-1611: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1611: Mitigation Action Plan Colorado Highlands Wind Project, Logan County, Colorado Colorado Highlands Wind LLC applied to Western Area Power Administration to interconnect a...

265

EIS-0332: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

kilovolt transmission line between Bonneville Power Administration's existing McNary and John Day substations. Mitigation Action Plan for the McNary-John Day Transmission Line...

266

Waste management plan for the removal action at the former YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

This waste management plan defines the procedures for control and management of waste generated as a result of the removal action of the YS-86O Firing Ranges site at the Oak Ridge Y-12 Plant. This document includes plan objectives; remediation activities; key personnel; waste generation activities; and waste treatment, storage, transportation, and disposal. Methods of control and characterization of waste generated as a result of remediation activities will be within the guidelines and procedures outlined herein. ENTECH personnel will make every effort when conducting remediation and decontamination activities to minimize the amount of generated waste.

NONE

1998-03-01T23:59:59.000Z

267

DOEIEV-0005/20 Formerly Utilized MED/AEC Sites Remedial Action Program  

Office of Legacy Management (LM)

20 20 Formerly Utilized MED/AEC Sites Remedial Action Program Radiological Survey of the Middlesex Municipal Landfill, Middlesex, New Jersey April 1980 , Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Office of Environmental Compliance and Overview Division of Environmental Control Technology DOE/EV-O005/20 UC-70 Formerly Utilized MED/AEC Sites Remedbl Action Program Radiological Survey uf the Middlesex Municipal Landfill, Middlesex, New Jersey April 1980 Final Report Prepared for U.S. Department of Energy Assistant Secretary for Environment Office of Environmental Compliance and Overview Division of Environmec!al Coctrol Technology Washington, D.C. 20545 by Oak Ridge National Laboratory Oak Ridge, Tennessee 37830

268

New York state information handbook formerly utilized sites remedial action program  

SciTech Connect

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying our the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New York. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

None

1980-12-31T23:59:59.000Z

269

New Mexico state information handbook: formerly utilized sites remedial action program  

SciTech Connect

This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

none,

2014-12-31T23:59:59.000Z

270

EIS-0380: Mitigation Action Plan Annual Report | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Mitigation Action Plan Annual Report Mitigation Action Plan Annual Report EIS-0380: Mitigation Action Plan Annual Report Los Alamos National Laboratory Site-Wide Environmental Impact Statement Fiscal Year 2012 Mitigation Action Plan Annual Report In Fiscal Year (FY) 2012, the Los Alamos National Laboratory (LANL) Site-Wide Environmental Impact Statement (SWEIS) Project Office focused on tracking and managing mitigation action commitments and reporting. Highlights for FY 2012 include the following: completion and distribution of the FY 2011 SWEIS Mitigation Action Plan Annual Report (DOE 2012), which included a section for the Las Conchas Fire, completion and distribution of the calendar year (CY) 2010 SWEIS Yearbook in April 2012 (LANL 2012a), construction and operation of SERF-E, construction of an institutional

271

EIS-0409: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EIS-0409: Mitigation Action Plan Kemper County Integrated Gasification Combined Cycle Project, Kemper County, Mississippi The Department of Energy (DOE) issued a Final Environmental Impact Statement (EIS) for the Kemper County Integrated Gasification Combine Cycle Project (Project) (DOE/EIS-0409) in May 2010 and a Record of Decision (ROD) in August 2010 (75 FR 51248). The ROD identified commitments to mitigate potential adverse impacts associated with the project. This Mitigation Action Plan (MAP) describes the monitoring and mitigation actions the recipient must implement during the design, construction, and demonstration of the Project. Mitigation Action Plan Kemper County Iintegrated Gasification Combined Cycle Project, Kemper County, Mississippi, DOE/EIS-0409 (September 2010)

272

EA-1923: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1923: Mitigation Action Plan Green Energy School Wind Turbine Project on Saipan, Commonwealth of the Northern Mariana Islands This Mitgation Action Plan specifies the methods for implementing mitigation measures that address the potential environmental impacts identified in DOE/EA-1923 and by the USFWS Biological Opinion issued to DOE on February 1, 2012, in accordance with the Endangered Species Act (ESA) (16 U.S.C.1531 et seq.). The development of these measures and an implementation plan, are a necessary condition for the DOE FONSI, as described by 40 CFR 1021.331(b) Mitigation action plans. EA-1923-MAP-2013 More Documents & Publications EA-1923: Final Environmental Assessment EA-1923: Draft Environmental Assessment EA-1923: Mitigated Finding of No Significant Impact

273

Mitigation Action Plans and Scenarios (MAPS) | Open Energy Information  

Open Energy Info (EERE)

(Redirected from CIFF-Chile-Mitigation Action Plans and Scenarios (MAPS)) (Redirected from CIFF-Chile-Mitigation Action Plans and Scenarios (MAPS)) Jump to: navigation, search Logo: Mitigation Action Plans and Scenarios (MAPS) Name Mitigation Action Plans and Scenarios (MAPS) Agency/Company /Organization The Children's Investment Fund Foundation, SouthSouthNorth, University of Cape Town-Energy Research Centre, Danish Government Sector Climate, Energy Topics Baseline projection, Low emission development planning, -LEDS, -NAMA, Pathways analysis Website http://www.mapsprogramme.org Program Start 2010 Program End 2013 Country Argentina, Brazil, Chile, Colombia, Peru, South Africa South America, South America, South America, South America, South America, Southern Africa References Mitigation Action Plans and Scenarios (MAPS)[1]

274

EA-1736: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1736: Mitigation Action Plan Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia Canyon at Los Alamos National Laboratory, Los Alamos, Los Alamos, New Mexico Based on the analysis of potential environmental impacts presented in the environmental assessment, neither the construction or operation of the expanded Sanitary Effluent Reclamation Facility considered in the two action alternatives for that facility, nor the environmental restoration action measures considered in the two action alternatives for reach S-2 of Sandia Canyon would have significant environmental impacts. Mitigation Action Plan for the Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia

275

Corrective Action Investigation Plan for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0  

SciTech Connect

Corrective Action Unit 562 is located in Areas 2, 23, and 25 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 562 is comprised of the 13 corrective action sites (CASs) listed below: 02-26-11, Lead Shot 02-44-02, Paint Spills and French Drain 02-59-01, Septic System 02-60-01, Concrete Drain 02-60-02, French Drain 02-60-03, Steam Cleaning Drain 02-60-04, French Drain 02-60-05, French Drain 02-60-06, French Drain 02-60-07, French Drain 23-60-01, Mud Trap Drain and Outfall 23-99-06, Grease Trap 25-60-04, Building 3123 Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on December 11, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 562. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 562 includes the following activities: Move surface debris and/or materials, as needed, to facilitate sampling. Conduct radiological surveys. Perform field screening. Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. Collect samples of source material to determine the potential for a release. Collect samples of potential remediation wastes. Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.

Alfred Wickline

2009-04-01T23:59:59.000Z

276

FY14 Affirmative Action Program Plan for Disabled Veterans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FY14 Affirmative Action Program Plan for FY14 Affirmative Action Program Plan for Disabled Veterans 1. PURPOSE: This Affirmative Action Program Plan for Disabled Veterans (Plan) establishes policy and procedures, identifies responsibilities, and in connection with the Department of Energy Operational Plan and Desktop Reference for the Veterans Employment Initiative sets objectives for the Department of Energy (DOE). It has become an attachment to the Operational Plan. 2. SCOPE: The Plan is to serve as the guide for the Disabled Veterans' Affirmative Action Program (DVAAP) for all elements of the Department of Energy (DOE). 3. REFERENCES: A. Equal Employment Opportunity Commission (EEOC) Management Directive (MD) 715 and Guidance: http://www.eeoc.gov/federal/directives/md715instruct.cfm.

277

Sampling and analysis plan for the Bear Creek Valley Boneyard/Burnyard Accelerated Action Project, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meeting held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.

NONE

1998-03-01T23:59:59.000Z

278

Sample Lesson Plan Exit Routes, Emergency Action Plans, Fire Prevention Plans, and Fire Protection 1 Sample Lesson Plan  

E-Print Network (OSTI)

, Emergency Action Plans, Fire Prevention Plans, and Fire Protection Overview of the OSHA Standard Subpart E problems finding and using it. Subpart L, Fire Protection, contains requirements for fire brigades, and all installed to meet the fire protection requirements of 29 CFR Part 1910. Step 1: Planning the Lesson

Homes, Christopher C.

279

DOE Action Plan Addressing the Electricity Transmission System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. DEPARTMENT OF ENERGY U.S. DEPARTMENT OF ENERGY ACTION PLAN ADDRESSING THE ELECTRICITY TRANSMISSION SYSTEM ~DRAFT~ DOE Action Plan Addressing the Electricity Transmission System 1 Table of Contents * INTRODUCTION ................................................................................................................... 2 The Grid Tech Team ...................................................................................................... 2 Focus on Transmission .................................................................................................. 3 Roadmap Goals ............................................................................................................. 4 * PROCESS OVERVIEW ........................................................................................................... 5

280

UnitedStates-JapanJointNuclenrEnergyActionPlan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UnitedStates-JapanJointNuclenrEnergyActionPlan UnitedStates-JapanJointNuclenrEnergyActionPlan 1.Introduction 1.1BackguPoundandObjective P肥sidentBushoftheUnitedStatesandPrimeMinisterKoizumiofJapanhaveboth statedtheirstrongsupportfbrthecontributionofnuclearpowertoenergysecurityand theglobalenvironmenLJapanwasthefirstnationtoendorsePresidentBush,sGIobal NuclearEnergyParmership. DuringtheJune29,2006meetingbetweenPresidentBushandPIimeMinister

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Darwin Anegada BAP 2006 Page Darwin Initiative Action Plan  

E-Print Network (OSTI)

Darwin Anegada BAP 2006 Page Darwin Initiative Action Plan for the Coastal Biodiversity of Anegada of Anegada; the stewards of Anegada's biodiversity and to Raymond Walker of the BVI National Parks Trust who.K.Woodfield. 2006. Darwin Initiative Action Plan for the Coastal Biodiversity of Anegada, British Virgin Islands. 13

Exeter, University of

282

Implementation Proposal for The National Action Plan on Demand Response |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Proposal for The National Action Plan on Demand Implementation Proposal for The National Action Plan on Demand Response Implementation Proposal for The National Action Plan on Demand Response August 1, 2011 - 3:54pm Addthis EXECUTIVE SUMMARY The staff of the Federal Energy Regulatory Commission (FERC) and the U.S. Department of Energy (DOE) developed this implementation proposal as required by section 529 of the Energy Independence and Security Act of 2007 (EISA).1 In particular, this proposal complies with EISA's mandate "to submit to Congress a proposal to implement the [National] Action Plan [on Demand Response], including specific proposed assignments of responsibility, proposed budget amounts, and any agreements secured for participation from State and other participants."2 The objective of the proposal is to implement the National Action Plan to

283

EA-1706: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

706: Mitigation Action Plan 706: Mitigation Action Plan EA-1706: Mitigation Action Plan West Tennessee Solar Farm Project Haywood County, Tennessee Based on the analyses in the Environmental Assessment, DOE determined that its proposed action - allowing the State of Tennessee to use some of its State Energy Program funds appropriated in the American Recovery and Reinvestment Act to construct and operate the West Tennessee Solar Farm Project - would not result in any significant environmental impacts. Mitigation Action Plan for the West Tennessee Solar farm Project Haywood County, Tennessee, DOE/EA-1706 More Documents & Publications EA-1706: Finding of No Significant Impact EA-1706: Final Environmental Assessment 2012 Annual Planning Summary for Fossil Energy, National Energy Technology

284

EERE Announces Next Steps on President's Climate Action Plan | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EERE Announces Next Steps on President's Climate Action Plan EERE Announces Next Steps on President's Climate Action Plan EERE Announces Next Steps on President's Climate Action Plan July 3, 2013 - 12:00pm Addthis Photo of President Obama talking at a podium, in front of a banner that says 'U.S. Department of Energy.' On Friday, June 28, the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy hosted a webinar on the energy efficiency aspects of the President's Climate Action Plan. Rick Duke, Associate Director of the White House Council on Environmental Quality and the Domestic Policy Council, provided an overview of President Obama's comprehensive Climate Action Plan to cut the carbon pollution that causes climate change and threatens our health. The Department of Energy's Deputy Assistant Secretary for Energy Efficiency, Kathleen Hogan, provided a

285

EERE Announces Next Steps on President's Climate Action Plan | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EERE Announces Next Steps on President's Climate Action Plan EERE Announces Next Steps on President's Climate Action Plan EERE Announces Next Steps on President's Climate Action Plan July 3, 2013 - 12:00pm Addthis Photo of President Obama talking at a podium, in front of a banner that says 'U.S. Department of Energy.' On Friday, June 28, the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy hosted a webinar on the energy efficiency aspects of the President's Climate Action Plan. Rick Duke, Associate Director of the White House Council on Environmental Quality and the Domestic Policy Council, provided an overview of President Obama's comprehensive Climate Action Plan to cut the carbon pollution that causes climate change and threatens our health. The Department of Energy's Deputy Assistant Secretary for Energy Efficiency, Kathleen Hogan, provided a

286

EA-1636: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1636: Mitigation Action Plan Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kVtransmission line in Linn, Benton and Lincoln counties, Oregon. Mitigation Action Plan for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project More Documents & Publications EA-1636: Final Environmental Assessment EA-1636: Finding of No Significant Impact

287

Mitigation Action Plans (MAP) and Related Documents | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1, 2010 December 1, 2010 EA-1782: Mitigation Action Plan University of Delaware Lewes Campus Onsite Wind Energy Project September 1, 2010 EIS-0409: Mitigation Action Plan Kemper County Integrated Gasification Combined Cycle Project, Kemper County, Mississippi August 24, 2010 EA-1736: Mitigation Action Plan Expansion of the Sanitary Effluent Reclamation Facility and Environmental Restoration of Reach S-2 of Sandia Canyon at Los Alamos National Laboratory, Los Alamos, Los Alamos, New Mexico July 10, 2010 EIS-0026: 2010 Annual Mitigation Report Waste Isolation Pilot Plant June 4, 2010 EA-1704: Mitigation Action Plan Construction and Operation of a Proposed Cellulosic Biorefinery, BlueFire Fulton Renewable Energy, LLC, Fulton, Mississippi January 1, 2010 EA-1755: Mitigation Action Plan

288

EIS-0128: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

128: Mitigation Action Plan 128: Mitigation Action Plan EIS-0128: Mitigation Action Plan Los Banos-Gates (Path 15) Transmission Project This MAP addresses the construction, operation, and maintenance of the new 84-mile long 500-kV transmission line. Necessary work conducted by Pacific Gas and Electric (PG&E) at their substations will occur within the previously disturbed area inside the substation boundaries. Western or Trans Elect, Inc. will also not have a role in upgrading the various existing PG&E 230-kV system components. DOE/EIS-0128, Western Area Power Administration, Mitigation Action Plan for the Los Banos-Gates (Path 15) Transmission Project (January 2003) More Documents & Publications EIS-0128: Mitigation Action Plan FAQS Gap Analysis Qualification Card - Mechanical Systems

289

City of Aspen Climate Action Plan | Open Energy Information  

Open Energy Info (EERE)

Aspen Climate Action Plan Aspen Climate Action Plan Jump to: navigation, search Name City of Aspen Climate Action Plan Agency/Company /Organization City of Aspen Sector Energy, Water, Land Focus Area Buildings, Commercial, Residential, Offsets and Certificates, Economic Development, Goods and Materials - Embodied Energy, Industry - Industrial Processes, Greenhouse Gas, Land Use, People and Policy, Transportation, Water Conservation, Renewable Energy, Biomass - Biofuels, Biomass, Geothermal, Water Power, Biomass - Landfill Gas, Solar, - Solar Hot Water, - Solar Pv, Wind Phase Create a Vision, Determine Baseline, Develop Goals, Prepare a Plan, Get Feedback, Create Early Successes Resource Type Case studies/examples Availability Free - Publicly Available Publication Date 5/1/2007

290

EA-1870: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

70: Mitigation Action Plan 70: Mitigation Action Plan EA-1870: Mitigation Action Plan Utah Coal and Biomass Fueled Pilot Plant, Kanab, UT The Department of Energy (DOE) issues this Mitigation Action Plan (MAP) in conjunction with its Finding of No Significant Impact as to the department's proposed action of providing costshared funding for the Utah Coal and Biomass Fueled Pilot Plant Project. Based on the analyses in the Environmental Assessment (DOE/EA-1870), DOE determined that its proposed action allowing Viresco Energy, LLC (Viresco) to use federal funding to design, construct and operate a coal and biomass gasification pilot plant (pilot plant) - would not result in any significant environmental impacts. The pilot plant would evaluate the technical feasibility of using steam hydrogasification to convert coal and biomass (such as agricultural

291

Tank waste remediation system vadose zone program plan  

SciTech Connect

The objective of the vadose zone characterization under this program is to develop a better conceptual geohydrologic model of identified tank farms which will be characterized so that threats to human health and the environment from past leaks and spills, intentional liquid discharges, potential future leaks during retrieval, and from residual contaminants that may remain in tank farms at closure can be explicitly addressed in decision processes. This model will include geologic, hydrologic, and hydrochemical parameters as defined by the requirements of each of the TWRS programs identified here. The intent of this TWRS Vadose Zone Program Plan is to provide justification and an implementation plan for the following activities: Develop a sufficient understanding of subsurface conditions and transport processes to support decisions on management, cleanup, and containment of past leaks, spills, and intentional liquid discharges; Develop a sufficient understanding of transport processes to support decisions on controlling potential retrieval leaks; Develop a sufficient understanding of transport processes to support decisions on tank farm closure, including allowable residual waste that may remain at closure; and Provide new information on geotechnical properties in the 200 Area to supplement data used for design and performance assessment for immobilized low-activity waste disposal facilities.

Fredenburg, E.A.

1998-07-27T23:59:59.000Z

292

RCRA Facility Investigation/Remedial Investigation Work Plan Addendum for the TNX Area Operable Unit Groundwater Radiological Characterization  

SciTech Connect

The purpose of this document is to present a sampling and analysis plan for the Water Table Aquifer for purposes of obtaining additional data for remedial decision-making with respect to radioactive contamination in the groundwater.

Brewer, K.

2002-06-17T23:59:59.000Z

293

Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri  

SciTech Connect

The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the nature and extent of contamination is presented in Section 1.2, and the results of the BRA are summarized in Section 1.3. The objective of this FS is discussed in Section 1.4, and preliminary remediation goals are identified in Section 1.5. The organization of the remaining chapters of this FS is outlined in Section 1.6.

NONE

1999-07-15T23:59:59.000Z

294

EIS-0350-S1: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EIS-0350-S1: Mitigation Action Plan Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, NM This Mitigation Action Plan (MAP) describes mitigation and monitoring commitments for constructing and operating the Modified CMRR-NF. The commitments made in this MAP are designed to mitigate potentially adverse environmental consequences associated with the CMRR-NF Project as the CMRR-NF is constructed and operated, and as direct, indirect, and cumulative impacts from these actions occur over time. EIS-0350-S1-MAP-2011.pdf More Documents & Publications EIS-0350-S1: Final Supplemental Environmental Impact Statement EIS-0350-S1: Draft Supplemental Environmental Impact Statement

295

EA-1901: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Mitigation Action Plan 1: Mitigation Action Plan EA-1901: Mitigation Action Plan Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho This Mitigation Action Plan (MAP) is referenced in the Finding of No Significant Impact for the Kootenai River White Sturgeon and Burbot Hatcheries Project (Department of Energy Environmental Assessment-1901). This MAP includes all of the mitigation measures recommended in the Final Environmental Assessment to mitigate adverse environmental impacts. It includes some measures that are essential to render the impacts of the Proposed Action not significant and other measures that will decrease impacts that did not reach a level to be considered significant. EA-1901-MAP-2013.pdf More Documents & Publications

296

City of Boulder - Climate Action Plan Fund | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Boulder - Climate Action Plan Fund City of Boulder - Climate Action Plan Fund City of Boulder - Climate Action Plan Fund < Back Eligibility Commercial Industrial Residential Program Info State Colorado Program Type Public Benefits Fund Provider City of Boulder In November 2006, citizens of Boulder, Colorado, voted to approve Ballot Issue No. 202, authorizing the city council to levy and collect an excise tax from residential, commercial and industrial electricity customers for the purpose of funding a [http://www.bouldercolorado.gov/files/Environmental%20Affairs/climate%20a... climate action plan] to reduce greenhouse gas emissions. The plan outlines programs to increase energy efficiency, increase renewable energy use, reduce emissions from motor vehicles, and take other steps toward the goal

297

Chile-Mitigation Action Plans and Scenarios (MAPS) | Open Energy  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Chile-Mitigation Action Plans and Scenarios (MAPS) Jump to: navigation, search Logo: Chile-Mitigation Action Plans and Scenarios (MAPS) Name Chile-Mitigation Action Plans and Scenarios (MAPS) Agency/Company /Organization The Children's Investment Fund Foundation, SouthSouthNorth, University of Cape Town-Energy Research Centre, Danish Government Sector Climate, Energy Topics Baseline projection, Low emission development planning, -LEDS, -NAMA, Pathways analysis Website http://www.mapsprogramme.org Program Start 2010 Program End 2013 Country Chile South America References Mitigation Action Plans and Scenarios (MAPS)[1] Contents 1 Overview 2 MAPS Processes and Outcomes 2.1 Chile 2.2 Colombia 2.3 Peru

298

EA-1440: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

440: Mitigation Action Plan 440: Mitigation Action Plan EA-1440: Mitigation Action Plan National Renewable Energy Laboratory's South Table Mountain Complex The Department of Energy has issued a Supplemental Environmental Assessment and has prepared a Finding of No Significant Impact for three site development projects at the National Renewable Energy Laboratory's South Table Mountain site at Golden, Colorado. 1) Construction of the Research Support Facilities, a new office building or multi-building office complex; 2) Installation of phase 1 of planned Site Infrastructure Improvements (Phase 1 of Full Site Development); and 3) Upgrades to the Thermochemical User Facility (TCUF), TCUF High Bay area, and addition of the Thermochemical Biorefinery Pilot Plant. Mitigation Action Plan for the Supplement to the Final Site-Wide

299

EA-1440-S1: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1440-S1: Mitigation Action Plan National Renewable Energy Laboratory's South Table Mountain Complex, Golden, Colorado ThIs Mitigation Action Plan implements the mitigation measures associated with the potential environmental impact of a DOE proposal that consists of three site development projects at the National Renewable Energy Laboratory's (NREL) South Table Mountain (STM) site at Golden, Colorado: Construction of the Research Support Facilities (RSF), a new office building or multi-building office complex; Installation of Phase 1 of planned Site Infrastructure Improvements (Phase 1 of Full Site Development); Upgrades to the Thermochemical User Facility (TCUF), TCUF High Bay area, and addition of the Thermochemical Biorefinery Pilot Plant

300

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet  

SciTech Connect

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort, the U.S. Department of Energy (DOE) determined that the degree of uncertainty in transport predictions for PSA remained unacceptably large. As a result, a second CAIP was developed by DOE and approved by the Nevada Division of Environmental Protection (NDEP) in December 1998 (DOE/NV, 1998a). This plan prescribed a rigorous analysis of uncertainty in the Shoal model and quantification of methods of reducing uncertainty through data collection. This analysis is termed a Data Decision Analysis (Pohll et al., 1999a) and formed the basis for a second major characterization effort at PSA (Pohll et al., 1999b). The details for this second field effort are presented in an Addendum to the CAIP, which was approved by NDEP in April 1999 (DOE/NV, 1999a). Four additional characterization wells were drilled at PSA during summer and fall of 1999; details of the drilling and well installation are in IT Corporation (2000), with testing reported in Mihevc et al. (2000). A key component of the second field program was a tracer test between two of the new wells (Carroll et al., 2000; Reimus et al., 2003). Based on the potential exposure pathways, two corrective action objectives were identified for CAU 447: Prevent or mitigate exposure to groundwater contaminants of concern at concentrations exceeding regulatory maximum contaminant levels or risk-based levels; and Reduce the risk to human health and the environment to the extent practicable. Based on the review of existing data, the results of the modeling, future use, and current operations at PSA, the following alternatives have been developed for consideration at CAU 447: Alternative 1--No Further Action; Alternative 2--Proof-of-Concept and Monitoring with Institutional Controls; and Alternative 3--Contaminant Control. The corrective action alternatives were evaluated based on the approach outlined in the ''Focused Evaluation of Selected Remedial Alternatives for the Underground Test Area'' (DOE/NV, 1998b). Each alternative was assessed against nine evaluation criteria. These criteria include overall protection of human health and the environment;

Tim Echelard

2006-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Smart Buildings: Business Case and Action Plan  

E-Print Network (OSTI)

deployment Develop measurement and verification plans andfuture projects. Measurement and verification of projectsdeployment Continued measurement and verification. Continued

Ehrlich, Paul

2009-01-01T23:59:59.000Z

302

Stage 4: Prioritizing and Planning for Actions | Open Energy Information  

Open Energy Info (EERE)

Stage 4: Prioritizing and Planning for Actions Stage 4: Prioritizing and Planning for Actions Jump to: navigation, search Stage 4 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities Develop_BAU Stage 4: Prioritizing and Planning for Actions Begin execution of implementation plans 1.0. Organizing the LEDS Process 1.1. Institutional Structure for LEDS 1.2. Workplan to Develop the LEDS 1.3. Roles and responsibilities to develop LEDS 2.1. Assess current country plans, policies, practices, and capacities 2.2. Compile lessons learned and good practices from ongoing and previous sustainable development efforts in the country 2.3. Assess public and private sector capacity to support initiatives 2.4. Assess and improve the national GHG inventory and other economic and resource data as needed for LEDS development

303

Climate Action Plan (New Hampshire) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (New Hampshire) Climate Action Plan (New Hampshire) Climate Action Plan (New Hampshire) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New Hampshire Program Type Climate Policies Provider Department of Environmental Services 29 members of Governor John Lynch's Climate Change Policy Task Force

304

Climate Action Plan (District of Columbia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (District of Columbia) Climate Action Plan (District of Columbia) Climate Action Plan (District of Columbia) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State District of Columbia Program Type Climate Policies To lead by example, and to capitalize on the many benefits of energy

305

US-Japan_NuclearEnergyActionPlan.pdf | Department of Energy  

Energy Savers (EERE)

US-JapanNuclearEnergyActionPlan.pdf US-JapanNuclearEnergyActionPlan.pdf US-JapanNuclearEnergyActionPlan.pdf More Documents & Publications Fact Sheet: United States-Japan Joint...

306

Work plan addendum for the remedial investigation and feasibility study of the Salmon Site  

SciTech Connect

This document is intended as an addendum to the Remedial Investigation and Feasibility Study (RI/FS) Work Plan for the Salmon Site (SS) (formerly the Tatum Dome Test Site) Lamar County, Mississippi. The original work plan - Remedial Investigation and Feasibility Study of the Tatum Dome Test Site, Lamar County, Mississippi (herein after called the Work Plan) was approved by the state of Mississippi in 1992 and was intended as the operative document for investigative activities at the Tatum Dome Test Site. Subsequent to the approval of the document a series of activities were undertaken under the auspices of the work plan. This document is organized in the same manner as the original work plan: (1) Introduction; (2) Site Background and History; (3) Initial Evaluation; (4) Data Quality Objectives; (5) RI/FS Tasks; (6) Project Schedule; (7) Project Management; and (8) Reference. This addendum will identify changes to the original work plan that are necessary because of additional information acquired at the SS. This document is not intended to replace the work plan, rather, it is intended to focus the remaining work in the context of additional site knowledge gained since the development of the original work plan. The U.S. Department of Energy (DOE) is conducting a focused and phased site characterization as a part, of the RI/FS. The RI/FS is the methodology under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) for evaluating hazardous waste sites on the National Priorities List (NPL). The SS is not listed on the NPL, but DOE has voluntarily elected to conduct the evaluation of the SS in accordance with CERCLA.

NONE

1995-11-01T23:59:59.000Z

307

EA-1456: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Mitigation Action Plan 6: Mitigation Action Plan EA-1456: Mitigation Action Plan Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado Western proposes to upgrade the existing 146 miles of CH-MM 115kB transmission line which crosses Carbon, Albany and Larmie Counties in Wyoming and 35 miles of the AU-CH transmission line which corsses portions of Laramie Counties, Wyoming and Weld County, Colorado. The upgrade would remove the existing 115-kV H-frame structures and replace them with new 230-Kv H-frame structures and single pole steel structures. Western also proposes to widen the existing right-of-way (ROW), where necessary to allow adequate electrical clearances. Mitigation Action Plan to Implement Mitigation Requirements for

308

EA-1755: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1755: Mitigation Action Plan Reconstruction of the South Access Road (CR 802) in Support of the Department of Energy, Waste Isolation Pilot Plant (WIPP) in Eddy County, New Mexico EA prepared for the proposed reconstruction of the Waste Isolation Pilot Plant (WIPP) South Access Road (County Road 802) located in Eddy County, New Mexico. Through the environmental review process, the Bureau of Land Management Carlsbad Field Office (BLM CFO) determined that there would be potential environmental impacts from the proposed project that would require mitigation to assure that the impacts would not become significant. Therefore, the Department of Energy Carlsbad Field Office (CBFO) prepared this Mitigation Action Plan (MAP) to establish conditions for issuing its

309

Release of the National Biofuels Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Release of the National Biofuels Action Plan Release of the National Biofuels Action Plan Release of the National Biofuels Action Plan October 7, 2008 - 4:14pm Addthis Remarks as Prepared for Delivery by Secretary Bodman Thank you, John Mizroch. It's good to be here with Tom Dorr and with Secretary Schafer. Our two departments' collaboration on biofuels development, begun years ago, has only strengthened over time due in large part to your personal attention and leadership. I am pleased to be here with you to unveil the National Biofuels Action Plan which, as Secretary Schafer just said, is a strategic blueprint that shows us the way to meet the President's goal of meaningful biofuels production by the year 2022. And to do it in cost-effective, environmentally-responsible ways that utilize a science-based approach to

310

The United States Releases its Open Government National Action Plan |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The United States Releases its Open Government National Action Plan The United States Releases its Open Government National Action Plan The United States Releases its Open Government National Action Plan September 20, 2011 - 1:58pm Addthis Cammie Croft Cammie Croft Senior Advisor, Director of New Media & Citizen Engagement Today, President Obama signs the Open Government Partnership declaration, unveiling the U.S. Open Government National Action Plan. At the Energy Department, we are committed to creating a more efficient and effective government while ensuring that taxpayers' money is wisely spent. Over the past year, we've taken a number of steps to make the Department more transparent and more participatory, including: Relaunching Energy.gov through a complete overhaul of its front-end and back-end design, making it an interactive information platform while

311

Fact Sheet: National Biofuels Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sheet: National Biofuels Action Plan Sheet: National Biofuels Action Plan Fact Sheet: National Biofuels Action Plan October 7, 2008 - 4:14pm Addthis In an effort to meet President Bush's "Twenty in Ten" goal and meet the Renewable Fuel Standard (RFS) targets in the Energy Independence and Security Act of 2007 (EISA) the Biomass Research and Development Board (the Board)-co-chaired by the U.S. Department of Agriculture (USDA) and the U.S. Department of Energy (DOE)-developed the National Biofuels Action Plan (NBAP) to accelerate the development of a sustainable biofuels industry. To meet increasing demand, we must continue to advance solutions that improve our energy security and reduce greenhouse gas emissions - our economic competitiveness, national security, and environmental health

312

The United States Releases its Open Government National Action Plan |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The United States Releases its Open Government National Action Plan The United States Releases its Open Government National Action Plan The United States Releases its Open Government National Action Plan September 20, 2011 - 1:58pm Addthis Cammie Croft Cammie Croft Senior Advisor, Director of New Media & Citizen Engagement Today, President Obama signs the Open Government Partnership declaration, unveiling the U.S. Open Government National Action Plan. At the Energy Department, we are committed to creating a more efficient and effective government while ensuring that taxpayers' money is wisely spent. Over the past year, we've taken a number of steps to make the Department more transparent and more participatory, including: Relaunching Energy.gov through a complete overhaul of its front-end and back-end design, making it an interactive information platform while

313

FACT SHEET: U.S.-China Energy Efficiency Action Plan  

Energy.gov (U.S. Department of Energy (DOE))

Today, President Barack Obama and President Hu Jintao announced the launch of a new U.S.-China Energy Efficiency Action Plan to strengthen the economy, improve energy security and combat climate change by reducing energy waste in both countries.

314

EIS-0332: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

kV transmission line between Bonneville Power Administration's existing McNary and John Day substations. DOEEIS-0332: Mitigation Action Plan for the McNary-John Day Transmission...

315

2006-2007 CHP Action Plan, Positioning CHP Value: Solutions for...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2006-2007 CHP Action Plan, Positioning CHP Value: Solutions for National, Regional and Local Energy Issues, September 2006 2006-2007 CHP Action Plan, Positioning CHP Value:...

316

2012 National Energy Assurance Planning Conference After-Action Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Assurance Planning Conference After-Action Energy Assurance Planning Conference After-Action Report (August 2012) 2012 National Energy Assurance Planning Conference After-Action Report (August 2012) On June 28-29, 2012, the Department of Energy, in coordination with the National Association of State Energy Officials (NASEO), held the National Energy Assurance Planning Conference. The conference culminated three years of DOE's ongoing American Recovery and Reinvestment Act of 2009 (ARRA) State and Local Energy Assurance Program (SLEAP). SLEAP seeks to develop new-or refine existing-energy assurance and emergency preparedness plans, which contribute to the resiliency of the energy sector by focusing on the entire energy supply system. The conference served as an important venue for State and local energy

317

Nordic TSOs' Action Plans in enhancing and monitoring Demand Response  

E-Print Network (OSTI)

Nordic TSOs' Action Plans in enhancing and monitoring Demand Response Nordel Market Committee.............................................................................................. 3 2. TSOS' ROLE IN ENHANCING DEMAND RESPONSE.............................. 3 3. ACTIONS TO ENSURE improvment ­ activate the energy efficiency actors 13 5. SYSTEMATIC MONITORING OF REALISED DEMAND RESPONSE 13

318

Bishop's University Energy Efficiency Action Plan  

E-Print Network (OSTI)

. Continuous basis Action 9: Sustainable Development standards for existing buildings. Go green certification from BOMA for existing buildings Bishop's University Sustainable Development policy (ELU Committee January 2008 Government of Quebec, energy strategy, May 2006 Sustainable Development law, 2006 Letter

319

University at Buffalo Climate Action Plan  

E-Print Network (OSTI)

........................................................................................ 2-5 2.3 Opportunities for Improving UB's GHG Inventory......................................... 2-9 2.4 The Impact of Campus Growth on UB's GHG Footprint.............................. 2-11 3 Actions-7 A APPENDICES................................................................................1 A. UB's GHG

Oh, Kwang W.

320

Determination of ecologically vital groundwaters at selected sites in the Formerly Utilized Sites Remedial Action Program  

SciTech Connect

The US Department of Energy is classifying groundwaters at sites in its Formerly Utilized Sites Remedial Action Program (FUSRAP). Of particular concern is the potential presence of groundwaters that are highly vulnerable to contamination and that are either (1) irreplaceable sources of drinking water or (2) ecologically vital. Conditions at nine FUSRAP sites were evaluated to determine if ecologically vital groundwaters are present. The sites evaluated were Wayne Interim Storage Site, Maywood Interim Storage Site, and Middlesex Sampling Plant in New Jersey; Ashland 2 Site, Seaway Industrial Park, Colonie Interim storage Site, and Niagara Falls Storage Site in New York; and the St. Louis Airport Site and Hazelwood Interim Storage Site in Missouri. The analyses indicated that groundwaters are vulnerable to contamination at all but two of the sites -- the Ashland 2 and Seaway Industrial Park sites in New York. Groundwater discharge points were identified within a 2-mile radius (i.e., the classification review area) of all of the sites. No ecologically vital groundwater areas exist in the vicinities of any of the nine FUSRAP sites evaluated. 35 refs., 17 figs.

Vinikour, W.S.; Yin, S.C.L.

1989-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

24 Command Fire Improvement Action Program Plan  

SciTech Connect

Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements.

GRIFFIN, G.B.

2000-12-01T23:59:59.000Z

322

Revised corrective action plan for underground storage tank 2331-U at the Building 9201-1 Site  

SciTech Connect

This document represents the Corrective Action Plan for underground storage tank (UST) 2331-U, previously located at Building 9201-1, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Tank 2331-U, a 560-gallon UST, was removed on December 14, 1988. This document presents a comprehensive summary of all environmental assessment investigations conducted at the Building 9201-1 Site and the corrective action measures proposed for remediation of subsurface petroleum product contamination identified at the site. This document is written in accordance with the regulatory requirements of the Tennessee Department of Environment and Conservation (TDEC) Rule 1200-1-15-.06(7).

Bohrman, D.E.; Ingram, E.M. [Oak Ridge Y-12 Plant, TN (United States)

1993-09-01T23:59:59.000Z

323

Fact Sheet: United States-Japan Joint Nuclear Energy Action Plan...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States-Japan Joint Nuclear Energy Action Plan Fact Sheet: United States-Japan Joint Nuclear Energy Action Plan Fact Sheet: United States-Japan Joint Nuclear Energy Action...

324

Climate Action Plan (New York) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (New York) Climate Action Plan (New York) Climate Action Plan (New York) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State New York Program Type Climate Policies Provider Department of Environmental Conservation In August of 2009 Governor David A. Paterson signed Executive Order No. 24 setting a goal to reduce greenhouse gas emissions in New York State by 80 percent below the levels emitted in 1990 by the year 2050. The Executive

325

EIS-0186: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

186: Mitigation Action Plan 186: Mitigation Action Plan EIS-0186: Mitigation Action Plan Alaska Industrial Development and Export Authority Healy Clean Coal Project In response to a Program Opportunity Notice issued in May 1989 by the Department of Energy (DOE) for the third solicitation of the Clean Coal Technology (CCT) Program, the Alaska Industrial Development and Export Authority (AIDEA) conceived, designed, and proposed the Healy Clean Coal Project (HCCP). The HCCP, a coal-fired power generating facility, would provide the necessary data for evaluating the commercial readiness of two promising technologies for decreasing emissions of sulfur dioxide (SO2), oxides of nitrogen (NOx), and particulate matter (PM). The two technologies to be demonstrated are the TRW Applied Technologies Division entrained

326

Green Building Action Plan for State Facilities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Building Action Plan for State Facilities Green Building Action Plan for State Facilities Green Building Action Plan for State Facilities < Back Eligibility State Government Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Bioenergy Manufacturing Buying & Making Electricity Solar Lighting Windows, Doors, & Skylights Heating Water Water Heating Wind Program Info State California Program Type Energy Standards for Public Buildings Provider California Energy Commission '''''Note: California voters approved [http://vig.cdn.sos.ca.gov/2012/general/pdf/text-proposed-laws-v2.pdf#nam... Ballot Proposition 39] in November 2012. The new law closes a tax loophole, which is expected to provide $1 billion in additional revenue every year.

327

EIS-0186: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Mitigation Action Plan 6: Mitigation Action Plan EIS-0186: Mitigation Action Plan Alaska Industrial Development and Export Authority Healy Clean Coal Project In response to a Program Opportunity Notice issued in May 1989 by the Department of Energy (DOE) for the third solicitation of the Clean Coal Technology (CCT) Program, the Alaska Industrial Development and Export Authority (AIDEA) conceived, designed, and proposed the Healy Clean Coal Project (HCCP). The HCCP, a coal-fired power generating facility, would provide the necessary data for evaluating the commercial readiness of two promising technologies for decreasing emissions of sulfur dioxide (SO2), oxides of nitrogen (NOx), and particulate matter (PM). The two technologies to be demonstrated are the TRW Applied Technologies Division entrained

328

Follow-up study of workers in a nylon carpet yarn plant after remedial actions taken against a contaminated humidification system  

Science Journals Connector (OSTI)

Objective: To investigate the effectiveness of remedial actions taken against a contaminated humidification system,...Methods:...Two and 6?years after modification, a follow-up investigation of a...

T. M. Pal; J. W. Groothoff; D. Post

2000-08-01T23:59:59.000Z

329

2007 Federal Technical Capabilities Program (FTCP) Corrective Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7,2007 7,2007 The Honorable A. J. Eggenberger Chairman, Defense Nuclear Facilities Safety Board 625 Indiana Avenue NW, Suite 700 Washington, D.C. 20004-290 1 Dear Mr. Chairman: Enclosed is Federal Technical Capability Program (FTCP) Corrective Action Plan, Revision 1, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, Revision 2, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004- 1. This plan has been updated to identify the completed and remaining Department corrective actions to improve recruiting, developing, training, qualifying, maintaining proficiency of, and retaining technical personnel to safely accomplish DOE'S mission. The plan is approved and issued for implementation, effective

330

Climate Action Plan (Nova Scotia, Canada) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nova Scotia, Canada) Nova Scotia, Canada) Climate Action Plan (Nova Scotia, Canada) < Back Eligibility Agricultural Commercial Construction Developer Industrial Installer/Contractor Institutional Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative State/Provincial Govt Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nova Scotia Program Type Climate Policies Provider Nova Scotia Environment Nova Scotia's Climate Change Action Plan has two main goals: reducing the province's contribution to climate change by reducing greenhouse gas (GHG) emissions and preparing for changes to the province's climate that are already inevitable. REDUCING GREENHOUSE GAS EMISSIONS

331

Climate Action Plan (Ontario, Canada) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ontario, Canada) Ontario, Canada) Climate Action Plan (Ontario, Canada) < Back Eligibility Agricultural Commercial Construction Developer Fuel Distributor General Public/Consumer Industrial Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info Start Date 2011 State Ontario Program Type Climate Policies Climate Ready, Ontario's Adaptation Strategy and Action Plan, outlines the problems, goals, and key strategies for the province's approach to climate

332

The Formerly Utilized Sites Remedial Action Program (FUSRAP) was initiated in 1974 to identify, investigate, and clean up or control sites throughout the United States that were part of the Nation's early atomic weapons and energy programs during the 1940  

E-Print Network (OSTI)

The Formerly Utilized Sites Remedial Action Program (FUSRAP) was initiated in 1974 to identify regulatory, technical, and other issues considered in decision making within the FUSRAP. BACKGROUND The Great activities at three Formerly Utilized Sites Remedial Action Program (FUSRAP) sites and continues remediation

US Army Corps of Engineers

333

Corrective Action Investigation Plan for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit, Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 335, Area 6 Injection Well and Drain Pit, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 335 consists of three Corrective Action Sites (CASs). The CAU is located in the Well 3 Yard in Area 6 at the Nevada Test Site. Historical records indicate that the Drain Pit (CAS 06-23-03) received effluent from truck-washing; the Drums/Oil Waste/Spill (CAS 06-20-01) consisted of four 55-gallon drums containing material removed from the Cased Hole; and the Cased Hole (CAS 06-20-02) was used for disposal of used motor oil, wastewater, and debris. These drums were transported to the Area 5 Hazardous Waste Accumulation Site in July 1991; therefore, they are no longer on site and further investigation or remediation efforts are not required. Consequently, CAS 06-20-01 will be closed with no further action and details of this decision will be described in the Closure Report for this CAU. Any spills that may have been associated with this CAS will be investigated and addressed under CAS 06-20-02. Field investigation efforts will be focused on the two remaining CASs. The scope of the investigation will center around identifying any contaminants of potential concern (COPCs) and, if present, determining the vertical and lateral extent of contamination. The COPCs for the Drain Pit include: total volatile/ semivolatile organic compounds, total petroleum hydrocarbons (gasoline-and diesel-range organics), ethylene glycol monobutyl ether, polychlorinated biphenyls, total Resource Conservation and Recovery Act metals, and radionuclides. The COPCs for the Cased Hole include: total volatile/ semivolatile organic compounds, total petroleum hydrocarbons (diesel-range organics only), and total Resource Conservation an d Recovery Act metals. Both biased surface and subsurface soil sampling will be conducted, augmented by visual inspection, video surveys, and electromagnetic surveys. The results of this field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

DOE/NV

2000-12-01T23:59:59.000Z

334

SPECIES PROFILE New Hampshire Wildlife Action PlanA-276  

E-Print Network (OSTI)

SPECIES PROFILE New Hampshire Wildlife Action PlanA-276 Federal Listing: Not listed State Listing caused by direct solar insolation and benefit from the cooling effects of wind caused by evaporative, as well as benefits from the cooling effects of wind. Eastern Red Bat Lasiurus borealis Roost trees

New Hampshire, University of

335

Superfund Record of Decision (EPA Region 4): Medley Farms, Cherokee County, Gaffney, SC. (First remedial action), May 1991. Final report  

SciTech Connect

The 7-acre Medley Farms site is a former waste disposal area located on a private farm used as pasture 6 miles south of Gaffney, Cherokee County, South Carolina. Land use in the area is predominantly agricultural and light residential, and six private wells are within a 1-mile radius of the site. The site overlies a shallow saprolitic and a deeper bedrock aquifer. All residents in the near vicinity of the site are connected to the public water distribution system. EPA conducted a geological study to determine the potential for ground water contamination. Subsequent EPA studies identified VOCs in both soil and ground water. The Record of Decision (ROD) addresses soil and ground water contamination as a final remedy. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene, PCE, and TCE; and other organics including pesticides and PCBs. The selected remedial action for the site is included.

Not Available

1991-05-29T23:59:59.000Z

336

us_national_action_plan_final_2.pdf  

NLE Websites -- All DOE Office Websites (Extended Search)

SEPTEMBER 20, 2011 SEPTEMBER 20, 2011 THE OPEN GOVERNMENT PARTNERSHIP NATIONAL ACTION PLAN FOR THE UNITED STATES OF AMERICA U.S. National ACTION PLAN INTRODUCTION Since the first day of his Administration, President Barack Obama has made Open Government a high priority. The Memorandum on Transparency and Open Government was the first executive action to bear the President's signature, and the President has pledged his Administration to work toward "an unprecedented level of openness in Government." Over the past two and a half years, Federal agencies have done a great deal to make government more transparent and more accessible, to provide people with information that they can use in their daily lives, to solicit public participation in government decision-making, and to collaborate with all sectors of the economy on new and innovative solutions.

337

2009 Federal Technical Capabilities Program (FTCP) Corrective Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

O. Box 5400 O. Box 5400 Albuquerque, NM 87185 The Honorable A.I. Eggenberger Chairman, Defense Nuclear Facilities Safety Board 625 Indiana Avenue NW, Suite 700 Washington D.C. 20004-2901 Dear Mr. Chairman: MAR 1 9 2009 Enclosed is the Federal Technical Capabilities Program (FTCP) Corrective Action Plan, Revision 2, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004-1. This plan has been updated to identify that all Department corrective actions to improve recruiting, developing, training, qualifying, maintaining proficiency of, and retaining technical personnel to safely accomplish DOE's mission have been completed. This revised

338

Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training.

NONE

1996-09-01T23:59:59.000Z

339

Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime`s, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives.

Not Available

1993-09-01T23:59:59.000Z

340

5 SURVEY PLANNING AND DESIGN 5.1 Introduction  

E-Print Network (OSTI)

the Radiation Survey and Site Investigation (RSSI) Process include scoping, characterization, remedial action support, and final status surveys. Although the scoping, characterization, and remedial action support of the level of effort for remediation and information for planning a more detailed survey

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

India National Action Plan on Climate Change | Open Energy Information  

Open Energy Info (EERE)

India National Action Plan on Climate Change India National Action Plan on Climate Change Jump to: navigation, search Tool Summary Name: India National Action Plan on Climate Change Agency/Company /Organization: India Prime Minister's Council On Climate Change Sector: Energy, Land Topics: Low emission development planning, Background analysis Resource Type: Publications, Case studies/examples Website: pmindia.nic.in/climate_change.htm Country: India Southern Asia Coordinates: 20.593684°, 78.96288° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":20.593684,"lon":78.96288,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

342

Bangladesh Climate Change Strategy and Action Plan | Open Energy  

Open Energy Info (EERE)

Bangladesh Climate Change Strategy and Action Plan Bangladesh Climate Change Strategy and Action Plan Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Bangladesh Climate Change Strategy and Action Plan Agency/Company /Organization: Bangladesh Ministry of Environment Sector: Energy, Land Topics: Low emission development planning Resource Type: Publications, Case studies/examples Website: www.moef.gov.bd/moef.pdf Country: Bangladesh Southern Asia Coordinates: 23.684994°, 90.356331° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":23.684994,"lon":90.356331,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

343

Indonesia National Action Plan Addressing Climate Change | Open Energy  

Open Energy Info (EERE)

Indonesia National Action Plan Addressing Climate Change Indonesia National Action Plan Addressing Climate Change Jump to: navigation, search Tool Summary Name: Indonesia National Action Plan Addressing Climate Change Agency/Company /Organization: Indonesia State Ministry of Environment Sector: Energy, Land Topics: Background analysis, Low emission development planning Resource Type: Case studies/examples, Publications Website: climatechange.menlh.go.id/index.php?option=com_docman&task=down&bid=17 Country: Indonesia South-Eastern Asia Coordinates: -0.789275°, 113.921327° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-0.789275,"lon":113.921327,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

344

US State Climate Action Plans | Open Energy Information  

Open Energy Info (EERE)

US State Climate Action Plans US State Climate Action Plans Jump to: navigation, search Tool Summary LAUNCH TOOL Name: US State Climate Action Plans Agency/Company /Organization: Center for Climate Strategies Sector: Energy, Land Topics: Low emission development planning, Background analysis Resource Type: Case studies/examples Website: www.climatestrategies.us/Papers_Publications_Presentations.cfm Country: United States Northern America Coordinates: 37.09024°, -95.712891° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.09024,"lon":-95.712891,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

345

A New Framework for Adaptive Sampling and Analysis During Long-Term Monitoring and Remedial Action Management  

SciTech Connect

DOE and other Federal agencies are making a significant investment in the development of field analytical techniques, nonintrusive technologies, and sensor technologies that will have a profound impact on the way environmental monitoring is conducted. Monitoring and performance evaluation networks will likely be base on suites of in situ sensors, with physical sampling playing a much more limited role. Designing and using these types of networks effectively will require development of a new paradigm for sampling and analysis of remedial actions, which is the overall goal of this project.

Minsker, Barbara; Albert Valocchi; Barbara Bailey

2008-01-27T23:59:59.000Z

346

CESP Tool 5.1: Goals, Strategies, and Actions Planning Worksheet  

Energy.gov (U.S. Department of Energy (DOE))

CESP Tool 5.1: Goals, Strategies, and Actions Planning Worksheet from Step 5: Develop Energy Goals and Strategies, Guide to Community Energy Strategic Planning.

347

Superfund record of decision (EPA Region 2): Dover Municipal Well 4, Morris County, Dover, NJ. (First remedial action), September 1992  

SciTech Connect

The Dover Municipal Well 4 (DMW-4) site is located within the 500-year floodplain of the Rockaway River, in the Town of Dover, Morris County, New Jersey. Surrounding land use is mixed residential and commercial/light industrial. In 1980, sampling and analysis of ground water from DMW-4 identified the presence of VOCs-specifically, chlorinated solvents-above federal and state drinking water standards. Subsequently, DMW-4 was voluntarily removed from service by the Town, and standby Well 3 was activated as a potable water production well. The sources of VOC contamination have been traced to the Howmet Turbine Components Corporation (Dover Casting Division) and the New Jersey Natural Gas Company, both of which are under state administrative consent orders to remediate their individual properties. The ROD addresses remediation of the contaminated ground water in the shallow, intermediate, and deep aquifers at the DMW-4 site, as OU1. The primary contaminants of concern affecting the ground water are VOCs, including benzene, PCE and TCE, and, metals including lead. The selected remedial action for this site includes onsite pumping and treatment of contaminated ground water from both the intermediate and deep aquifers using air stripping to remove VOCs; discharging the treated water offsite to the public water supply system to be used for potable water, with reinjection of surplus quantities.

Not Available

1992-09-30T23:59:59.000Z

348

Record of Technical Change - Corrective Action Plan for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada, Revision 0  

SciTech Connect

Record of Technical Change, Technical Change No. CAP-1, dated April 13, 2005 for Corrective Action Plan for Corrective Action Unit 204: Storage Bunkers, Nevada Test Site, Nevada, Revision 0, September 2004, DOE/NV--1003.

U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office; Bechtel Nevada

2005-04-13T23:59:59.000Z

349

Microsoft Word - Final Mitigated Action Plan - CNMI.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

| P | P a g e MITIGATION ACTION PLAN FOR THE FINAL ENVIRONMENTAL ASSESSMENT FOR THE GREEN ENERGY SCHOOL WIND PROJECT SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS U.S. Department of Energy Golden Service Center Office of Energy Efficiency and Renewable Energy DOE/EA-1923 2 | P a g e ACRONYMS AND ABBREVIATIONS AMC Adaptive Management Committee CFR Code of Federal Regulations DOE U.S. Department of Energy EA environmental assessment ESA Endangered Species Act FONSI finding of no significant impacts MAP mitigation action plan NEPA National Environmental Policy Act USFWS U.S. Fish and Wildlife Service 3 | P a g e 1.0 Introduction The United States Department of Energy (DOE) has issued a Final Environmental Assessment (EA) and a

350

United States -Japan Joint Nuclear Energy Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-Japan Joint Nuclear Energy Action Plan -Japan Joint Nuclear Energy Action Plan 1. Introduction 1.1 Background and Objective President Bush of the U n i t e d States and Prime Minister Koizumi of Japan have both stated their strong support for the contribution of nuclear power to energy security and the global environment. Japan w a s the first nation to endorse President Bush's Global Nuclear Energy Partnership. During the June 29,2006 meeting between President Bush and Prime Minister Koizumi, "We discussed research and development that will help speed up fnt breeder reactors and new types of reprocessing so that we cmt help deal with the cost of globalization when it comes to energy; make ourselves more secure, economicallyI a s well n make us less dependent on hycirocmbons ..... " (I)

351

Climate Action Plan (New Orleans) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Orleans) Orleans) Climate Action Plan (New Orleans) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Louisiana Program Type Climate Policies Provider New Orleans Environmental Affairs New Orleans' Climate Action Plan will provide a road map to reach the City's greenhouse gas (GHG) reduction goal by 2030 while orchestrating its

352

U.S.-Brazil Binational Joint Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S.-Brazil Binational Joint Action Plan U.S.-Brazil Binational Joint Action Plan U.S.-Brazil Binational Energy Working Group, formed on July 20, 2010, when DOE and the Brazilian...

353

U.S and Russia Develop Action Plan to Enhance Global and Bilateral...  

Energy Savers (EERE)

S and Russia Develop Action Plan to Enhance Global and Bilateral Nuclear Energy Cooperation U.S and Russia Develop Action Plan to Enhance Global and Bilateral Nuclear Energy...

354

MITIGATION ACTION PLAN FOR THE FINAL ENVIRONMENTAL ASSESSMENT,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MITIGATION MITIGATION ACTION PLAN FOR THE FINAL ENVIRONMENTAL ASSESSMENT, NOTICE OF WETLAND INVOLVEMENT, AND FINDING OF NO SIGNIFICANT IMPACT FOR THE CONSTRUCTION AND OPERATION OF A LIGNOCELLULOSIC U.S. Department of Energy Golden Field Office 1617 Cole Boulevard Golden, Colorado 80401 1.0 Introd uction 1 1.1 Purpose of the Mitigation Action Plan 1 1.2 Structure of the Mitigation Action Plan 2 2.0 Ambient Ai r Quality 3 2.1 Potential Impacts 3 2.2 Mitigation Measures 3 2.3 Metrics for Determining Success or Failure of the Mitigation Measures 4 2.4 Monitoring Techniques for Mitigation Measures 4 3.0 Truck Traffic 4 3.1 Potential Impacts 4 3.2 Mitigation Measures 4 3.3 Metrics for Determining Success or Failure of the Mitigation Measures 5 3.4 Monitoring Techniques for Mitigation Measures 5 4.0 Genetically Modified Yeasts 6 4.1 Potential Impacts 6 4.2 Mitigation Measures 6 4.3 Metrics for Determining

355

EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning- June 6, 2013  

Energy.gov (U.S. Department of Energy (DOE))

EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning, approved at the June 5-6, 2013 EAC Meeting.

356

UCSF Sustainability Action Plan UCSF Energy Targets and Strategies August 18, 2011 Page 1  

E-Print Network (OSTI)

UCSF Sustainability Action Plan UCSF Energy Targets and Strategies August 18, 2011 Page 1 UCSF Sustainability Action Plan: Appendix V: UCSF Energy Targets and Strategies Issue Date: August 18, 2011 #12;UCSF Sustainability Action Plan UCSF Energy Targets and Strategies August 18, 2011 Page 2 Proposed Targets

Yamamoto, Keith

357

Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada  

SciTech Connect

Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

NSTec Environmental Restoration

2007-07-01T23:59:59.000Z

358

Corrective Action Plan for Corrective Action Unit 417: Central Nevada Test Area Surface, Nevada  

SciTech Connect

This Corrective Action Plan provides methods for implementing the approved corrective action alternative as provided in the Corrective Action Decision Document for the Central Nevada Test Area (CNTA), Corrective Action Unit (CAU) 417 (DOE/NV, 1999). The CNTA is located in the Hot Creek Valley in Nye County, Nevada, approximately 137 kilometers (85 miles) northeast of Tonopah, Nevada. The CNTA consists of three separate land withdrawal areas commonly referred to as UC-1, UC-3, and UC-4, all of which are accessible to the public. CAU 417 consists of 34 Corrective Action Sites (CASs). Results of the investigation activities completed in 1998 are presented in Appendix D of the Corrective Action Decision Document (DOE/NV, 1999). According to the results, the only Constituent of Concern at the CNTA is total petroleum hydrocarbons (TPH). Of the 34 CASs, corrective action was proposed for 16 sites in 13 CASs. In fiscal year 1999, a Phase I Work Plan was prepared for the construction of a cover on the UC-4 Mud Pit C to gather information on cover constructibility and to perform site management activities. With Nevada Division of Environmental Protection concurrence, the Phase I field activities began in August 1999. A multi-layered cover using a Geosynthetic Clay Liner as an infiltration barrier was constructed over the UC-4 Mud Pit. Some TPH impacted material was relocated, concrete monuments were installed at nine sites, signs warning of site conditions were posted at seven sites, and subsidence markers were installed on the UC-4 Mud Pit C cover. Results from the field activities indicated that the UC-4 Mud Pit C cover design was constructable and could be used at the UC-1 Central Mud Pit (CMP). However, because of the size of the UC-1 CMP this design would be extremely costly. An alternative cover design, a vegetated cover, is proposed for the UC-1 CMP.

K. Campbell

2000-04-01T23:59:59.000Z

359

E-Print Network 3.0 - action work plan Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

work plan Search Powered by Explorit Topic List Advanced Search Sample search results for: action work plan Page: << < 1 2 3 4 5 > >> 1 The two faces of plan repair Roman van der...

360

Tank waste remediation system operation and utilization plan,vol. I {ampersand} II  

SciTech Connect

The U.S. Department of Energy Richland Operations Office (RL) is in the first stages of contracting with private companies for the treatment and immobilization of tank wastes. The components of tank waste retrieval, treatment, and immobilization have been conceived in two phases (Figure 1.0-1). To meet RL's anticipated contractual requirements, the Project Hanford Management Contractor (PHMC) companies will be required to provide waste feeds to the private companies consistent with waste envelopes that define the feeds in terms of quantity, and concentration of both chemicals and radionuclides. The planning that supports delivery of the feed must be well thought out in four basic areas: (1) Low-activity waste (LAW)/high-level waste (HLW) feed staging plans. How is waste moved within the existing tanks to deliver waste that corresponds to the defined feed envelopes to support the Private Contractor's processing schedule and processing rate? (2) Single-shell tank (SST) retrieval sequence. How are Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1994) milestones for SST retrieval integrated into the Phase I processing to set the stage for Phase II processing to complete the mission? (3) Tank Waste Remediation System (TWRS) process flowsheet. How do materials flow from existing tank inventories through: (1) blending and pretreatment functions in the double-shell tanks (DSTs), (2) contractor processing facilities, and (3) stored waste forms (Figure 1.0-2); (4) Storage and disposal of the immobilized low-activity waste (ILAW) and immobilized high-level waste (IHLW) product. How is the ILAW and IHLW product received from the private companies, the ILAW disposed onsite, and the IHLW stored onsite until final disposal?

Kirkbride, R.A.

1997-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Remedial Design/Remedial Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis November 2010 LMS/LEH/S05822-0.0 This page intentionally left blank LMS/LEH/S05822-0.0 Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis November 2010 This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page i Contents Abbreviations ................................................................................................................................. iii 1.0 Introduction ........................................................................................................................1-1

362

CENTRAL PLATEAU REMEDIATION  

SciTech Connect

A systematic approach to closure planning is being implemented at the Hanford Site's Central Plateau to help achieve the goal of closure by the year 2035. The overall objective of Central Plateau remediation is to protect human health and the environment from the significant quantity of contaminated material that resulted from decades of plutonium production in support of the nation's defense. This goal will be achieved either by removing contaminants or placing the residual contaminated materials in a secure configuration that minimizes further migration to the groundwater and reduces the potential for inadvertent intrusion into contaminated sites. The approach to Central Plateau cleanup used three key concepts--closure zones, closure elements, and closure process steps--to create an organized picture of actions required to complete remediation. These actions were merged with logic ties, constraints, and required resources to produce an integrated time-phased schedule and cost profile for Central Plateau closure. Programmatic risks associated with implementation of Central Plateau closure were identified and analyzed. Actions to mitigate the most significant risks are underway while high priority remediation projects continue to make progress.

ROMINE, L.D.

2006-02-01T23:59:59.000Z

363

Rrecord of Decision (EPA Region 5): Chem-Central Site, Wyoming, MI. (First remedial action), September 1991. Final report  

SciTech Connect

The 2-acre Chem-Central site is a bulk chemical storage facility in Wyoming, Kent County, Michigan. Land use in the area is a mixture of residential and commercial. An estimated 10,000 people live within 1 mile of the site and receive their water supply via the municipal distribution system. Two creeks, Cole Drain and Plaster Creek, lie in proximity to the site. Between 1957 and 1962, hazardous substances entered the ground as a result of faulty construction of a .T-arm pipe used to transfer liquid products from bulk storage tanks to small delivery trucks. Additional hazardous substances may have entered the ground through accidental spills. In 1977, a routine State biological survey of Plaster Creek identified a contaminated ditch containing oils with organic compounds including PCBs and metals that was discharging into Cole Drain. Between 1978 and 1986, the State and EPA focused their efforts on finding and eliminating the source of the ditch contamination through extensive investigations of area soil, ground water, and surface water. Results indicated that ground water and soil surrounding and north of the Chem-Central plant were contaminated with volatile and semi-volatile organic compounds. The Record of Decision (ROD) addresses a remedy for contaminated onsite soil, contaminated offsite soil surrounding and north of the plant, and then addresses a remedy for contaminated onsite soil, contaminated offsite soil surrounding and north of the plant, and the ground water contamination plume emanating from the plant and spreading 1,800 feet northward. The primary contaminants of concern affecting the soil and ground water are VOCs including PCE, TCE, and toluene; and other organics including PAHs and PCBs. The selected remedial action for this site is included.

Not Available

1991-09-30T23:59:59.000Z

364

Microsoft Word - Mitigation Action Plan master.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Palisades-Goshen Transmission Line Reconstruction Project Palisades-Goshen Transmission Line Reconstruction Project DOE/EA-1591 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Palisades-Goshen Transmission Line Reconstruction Project. The project involves reconstruction of the existing Palisades-Goshen 115-kV transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. This MAP is for the Proposed Action and includes all integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental impacts. No impacts reached the level to be considered significant even without these mitigation measures.

365

Jackson Bluff Hydroelectric Project: emergency action plan, City of Tallahassee  

SciTech Connect

Jackson Bluff Dam is located on the Ochlockonee River about 66 miles upstream from its mouth at the Gulf of Mexico and approximately 20 miles west-southwest of the City of Tallahassee. The site is situated in Leon, Gadsden, and Liberty counties. The dam consists of a 3600 ft long earth embankment with the crest at EL. 77 (MSL). About 1000 ft north of the end of the main dam is a saddle dam. The saddle dam is approximately 550 ft long and has crest at EL 72.3 (4.7 ft below the main dam). The gated spillway and the powerhouse are located at the southeast end of the dam. The purpose of the Emergency Action Plan is to specify actions to be taken in the event of flooding of the downstream of the Ochlockonee River due to failure of the dam.

Not Available

1984-05-01T23:59:59.000Z

366

Microsoft Word - Bots Plan of Action.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

V.1 V.1 11/25/2009 U.S. DEPARTMENT OF ENERGY CYBER SECURITY AWARENESS & TRAINING Spiders, Crawlers and Bots Campaign Plan of Action Office of the Chief Information Officer DRAFT V.1 11/25/2009 1 Version Date Author Change Description 1.0 May 23, 2008 Lisa Taylor Submitted to Client DRAFT V.1 11/25/2009 2 1) PLAN FOR SPIDERS, CRAWLERS AND BOTS CAMPAIGN This document defines a cyber security awareness campaign in DOE Headquarters specifically on Spiders, Crawlers and Bots. The campaign includes displays, distribution of literature and promotional items, and a variety of activities during the months of July, August and September 2008. Reference materials and promotional items will be disseminated during this time to employees and contractors within DOE facilities.

367

An Alfirmotive Action/Equal Opportunity Employer STATUS AND PLANS  

Office of Legacy Management (LM)

I&s ' c I&s ' c c scilenti ? alamos c laboratoiy of ihe University of California Lsr i'"""', i'" MEXICO 8,545 An Alfirmotive Action/Equal Opportunity Employer STATUS AND PLANS REPORT FOR FORMER TECHNICAL AREA ONE AT LOS ALAMOS SCIENTIFIC LABORATORY HEALTH RESEARCH DIVISION JANUARY i976 I I I I I I I if n II 9 I I I I. I I I I STATUS AND PLANS REPORT FOR FORMER TECHNICAL AREA ONE AT LOS ALAMOS SCIENTIFIC LABORATORY INTRODUCTION Because of increased official and public concern over low-level radioactive contamination of private lands or former ERDA (AEC) lands released to the public, the undeveloped part of the former main tech- nical area of LASL (TA-1) was surveyed in 1974 at the request of ERDA @EC)*. This effort was to determine whether any of the land (%40

368

Climate Action Plan (Rhode Island) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rhode Island) Rhode Island) Climate Action Plan (Rhode Island) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Rhode Island Program Type Climate Policies Provider Department of Environmental Management In the fall of 2001, the Department of Environmental Management (DEM), the

369

Climate Action Plan (North Carolina) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

North Carolina) North Carolina) Climate Action Plan (North Carolina) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State North Carolina Program Type Climate Policies Provider Department of Environment and Natural Resources The North Carolina Department of Environmental and Natural Resources (DENR)

370

Climate Action Plan (South Carolina) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

South Carolina) South Carolina) Climate Action Plan (South Carolina) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State South Carolina Program Type Climate Policies Provider Environmental Policy Advisor Governor Sanford issued Executive Order 2007-04 on February 16, 2007,

371

Climate Action Plan (New Brunswick, Canada) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Brunswick, Canada) Brunswick, Canada) Climate Action Plan (New Brunswick, Canada) < Back Eligibility Agricultural Commercial Construction Developer Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New Jersey Program Type Climate Policies Provider New Brunswick Environment and Local Government New Brunswick-led initiatives will result in greenhouse gas emission

372

Climate Action Plan (New Mexico) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mexico) Mexico) Climate Action Plan (New Mexico) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New Mexico Program Type Climate Policies Provider New Mexico Environment Department Recognizing the profound implications that global warming and climate variation could have on the economy, environment and quality of life in the

373

DOE/OR/20722-22 UC-70A DBaffu Formerly Utilized Sites Remedial Action Program (FUSRAP)  

Office of Legacy Management (LM)

22 22 UC-70A DBaffu Formerly Utilized Sites Remedial Action Program (FUSRAP) Contract No. DE-ACO5-81OR20722 c P c P RADIOLOGICAL SURVEY REPORT FOR THE DUPONT CHAMBER WORKS PLANT Deepwater, New Jersey Bechtel National, Inc. Advanced Technology Division June 1984 Technical Information Center Office of Scientific and Technical Information U.S. Department of Energy -- .,,.... - ~S",.W -. - - -. _ -- --- --.- ----.-- ___ ..---. -.~ LEGAL NOTICE ' I91i.m report war prepared u M account of work rponsored by the United SUWO Government. Neither the United State6 nor the United Stator Department of Energy. nor any of their employee& DO1 any of their COnb8CWlr, rubcontractorr, or their employns. make6 any wananty. expmr or implied. or l 66ume6 any legal liability or responribility for the accuracy, completeness

374

A demonstration of the applicability of implementing the enhanced Remedial Action Priority System (RAPS) for environmental releases  

SciTech Connect

The Remedial Action Priority System (RAPS) and the Multimedia Environmental Pollutant Assessment System (MEPAS) were developed to prioritize problems associated with potential releases of hazardous chemical and radioactive materials in a scientific and objective manner based on limited site information. This report documents the model testing efforts of the RAPS/MEPAS methodology for the atmospheric, surface water, groundwater, and exposure components. Comparisons are given of model outputs with measured data at three sites: the US Department of Energy's Mound facility in Ohio and Hanford facility in Washington, and a chromium-cadmium plating site in New York. The results show that the simulated magnitudes, spacial and temporal trends, and distributions of contaminants corresponded well with the measured data. 25 refs., 86 figs., 26 tabs.

Whelan, G.; Droppo, J.G. Jr.; Strenge, D.L.; Walter, M.B.; Buck, J.W.

1989-12-01T23:59:59.000Z

375

Radiologic characterization of the Mexican Hat, Utah, uranium mill tailings remedial action site: Appendix D, Addenda D1--D7  

SciTech Connect

This radiologic characterization of the inactive uranium millsite at Mexican Hat, Utah, was conducted by Bendix Field Engineering Corporation foe the US Department of Energy (DOE), Grand Junction Project Office, in response to and in accord with a Statement of Work prepared by the DOE Uranium Mill tailings Remedial Action Project (UMTRAP) Technical Assistance Contractor, Jacobs Engineering Group, Inc. the objective of this project was to determine the horizontal and vertical extent of contamination that exceeds the US Environmental Protection Agency (EPA) standards at the Mexican Hat site. The data presented in this report are required for characterization of the areas adjacent to the Mexican Hat tailings piles and for the subsequent design of cleanup activities. Some on-pile sampling was required to determine the depth of the 15-pCi/g Ra-226 interface in an area where wind and water erosion has taken place.

Ludlam, J.R.

1985-01-01T23:59:59.000Z

376

Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites Slick Rock, Colorado. Draft  

SciTech Connect

The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the sites and on vicinity properties (VP) associated with the sites. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contained measures to control the contaminated materials and to protect the groundwater from further degradation. Remedial actions at the Slick Rock sites must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC).

NONE

1993-06-01T23:59:59.000Z

377

FTCP FY09 Operational Plan GOAL 2 Objectives and Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Technical Capability Program Federal Technical Capability Program FY 2009 Operational Plan Preserve and Enhance Technical Capability Action Plan F F E E D D E E R R A A L L T T E E C C H H N N I I C C A A L L C C A A P P A A B B I I L L I I T T Y Y P P R R O O G G R R A A M M F F Y Y 2 2 0 0 0 0 9 9 O O P P E E R R A A T T I I O O N N A A L L P P L L A A N N GOAL 2: Preserve and Enhance Technical Capability * Champions: Dave Chaney, NNSA Service Center and Larry Kelly, Oak Ridge Office Objectives/Actions Identify Resource and Organizational Structure Needs to Improve Qualification Consistency and Transportability * Champion: Allen Tate, SSO * Determine appropriate resource levels * Determine effective organizational structure Establish an Effective Mid-Level Recruitment Program * Champions:Sean Clayton, HQ HC-13 and Barry Weaver, ETS * Benchmark existing programs

378

Addendum to the East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan Oak Ridge, Tennessee  

SciTech Connect

The East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan (DOE 2004) describes the planned fieldwork to support the remedial investigation (RI) for residual contamination at the East Tennessee Technology Park (ETTP) not addressed in previous Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) decisions. This Addendum describes activities that will be conducted to gather additional information in Zone 1 of the ETTP for groundwater, surface water, and sediments. This Addendum has been developed from agreements reached in meetings held on June 23, 2010, August 25, 2010, October 13, 2010, November 13, 2010, December 1, 2010, and January 13, 2011, with representatives of the U. S. Department of Energy (DOE), U. S. Environmental Protection Agency (EPA), and Tennessee Department of Environment and Conservation (TDEC). Based on historical to recent groundwater data for ETTP and the previously completed Sitewide Remedial Investigation for the ETTP (DOE 2007a), the following six areas of concern have been identified that exhibit groundwater contamination downgradient of these areas above state of Tennessee and EPA drinking water maximum contaminant levels (MCLs): (1) K-720 Fly Ash Pile, (2) K-770 Scrap Yard, (3) Duct Island, (4) K-1085 Firehouse Burn/J.A. Jones Maintenance Area, (5) Contractor's Spoil Area (CSA), and (6) Former K-1070-A Burial Ground. The paper presents a brief summary of the history of the areas, the general conceptual models for the observed groundwater contamination, and the data gaps identified.

SAIC

2011-04-01T23:59:59.000Z

379

The University of Tokyo herein releases the UT Action Plan 2005-2008  

E-Print Network (OSTI)

revised version of the UT Action Plan. Last year we held six meetings to review and discuss the ActionThe University of Tokyo herein releases the UT Action Plan 2005-2008 Revised 2007 "Autonomous that, during these past two years, the financial and regulatory conditions, along with the mindsets

Yamamoto, Hirosuke

380

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada  

Office of Legacy Management (LM)

Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada Controlled Copy No.: Revision No.: 3 March 2006 Approved for public release; further dissemination unlimited. DOE/NV--1025--Rev. 3 Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis.gov Online ordering: http://www.ntis.gov/ordering.htm Available electronically at http://www.osti.gov/bridge Available for a processing fee to U.S. Department of Energy and its contractors, in paper, from: U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831-0062

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Fact Sheet: United States-Japan Joint Nuclear Energy Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States-Japan Joint Nuclear Energy Action Plan United States-Japan Joint Nuclear Energy Action Plan The United States-Japan Joint Nuclear Energy Action Plan is intended to provide a framework for bilateral collaboration in nuclear energy. This Action Plan builds upon our significant, longstanding civilian nuclear cooperation, and will contribute to increasing energy security and managing nuclear waste, addressing nuclear nonproliferation and climate change, advancing goals put forth in President Bush's Global Nuclear Energy Partnership (GNEP) initiative. The Action Plan was signed by representatives of both nations in April 2007. The Action Plan will be implemented by Steering Committee Co-Chairs. Assistant Secretary of Energy Dennis Spurgeon, or his designee, will serve as the U.S. Co-Chair. Japanese Co-Chairs will be selected

382

Peru-Mitigation Action Plans and Scenarios (MAPS) | Open Energy Information  

Open Energy Info (EERE)

Peru-Mitigation Action Plans and Scenarios (MAPS) Peru-Mitigation Action Plans and Scenarios (MAPS) Jump to: navigation, search Logo: Peru-Mitigation Action Plans and Scenarios (MAPS) Name Peru-Mitigation Action Plans and Scenarios (MAPS) Agency/Company /Organization The Children's Investment Fund Foundation, SouthSouthNorth, University of Cape Town-Energy Research Centre, Danish Government Sector Climate, Energy Topics Baseline projection, Low emission development planning, -LEDS, -NAMA, Pathways analysis Website http://www.mapsprogramme.org Program Start 2010 Program End 2013 Country Peru South America References Mitigation Action Plans and Scenarios (MAPS)[1] Contents 1 Overview 2 MAPS Processes and Outcomes 2.1 Chile 2.2 Colombia 2.3 Peru 2.4 Brazil 2.5 Resources 2.5.1 Mitigation Action Country Studies

383

President Obama presents new Climate Action Plan | OpenEI Community  

Open Energy Info (EERE)

President Obama presents new Climate Action Plan President Obama presents new Climate Action Plan Home > Blogs > Graham7781's blog Graham7781's picture Submitted by Graham7781(1992) Super contributor 27 June, 2013 - 12:39 Climate Action Plan obama OpenEI President President Obama layed out his much anticipated Climate Action Plan tuesday. The President's plan calls for major actions that the administration believes will mitigate the environmental and economic costs of climate change. Obama's six Climate Action Initiatives: 1. Phasing out Fossil Fuels The President stressed the need for higher standards on carbon emissions. The plan will call on the Environmental Protection Agency to work up carbon pollution standards, as well as the Department of Energy to receive up to $8 billion in loan guarantees for a wide array of advanced fossil fuel

384

National Action Plan on Demand Response, June 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Plan on Demand Response, June 2010 Action Plan on Demand Response, June 2010 National Action Plan on Demand Response, June 2010 The Federal Energy Regulatory Commission (FERC) is required to develop the National Action Plan on Demand Response (National Action Plan) as outlined in section 529 of the Energy Independence and Security Act of 2007 (EISA), entitled "Electricity Sector Demand Response." This National Action Plan is designed to meet three objectives: Identify "requirements for technical assistance to States to allow them to maximize the amount of demand response resources that can be developed and deployed." Design and identify "requirements for implementation of a national communications program that includes broad-based customer education and support."

385

Oak Ridge National Laboratory Technology Logic Diagram. Volume 3, Technology evaluation data sheets: Part B, Dismantlement, Remedial action  

SciTech Connect

The Oak Ridge National Laboratory Technology Logic Diagram (TLD) was developed to provide a decision support tool that relates environmental restoration (ER) and waste management (WM) problems at Oak Ridge National Laboratory (ORNL) to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration testing, and evaluation needed to develop these technologies to a state that allows technology transfer and application to decontamination and decommissioning (D&D), remedial action (RA), and WM activities. The TLD consists of three fundamentally separate volumes: Vol. 1, Technology Evaluation; Vol. 2, Technology Logic Diagram and Vol. 3, Technology EvaLuation Data Sheets. Part A of Vols. 1 and 2 focuses on RA. Part B of Vols. 1 and 2 focuses on the D&D of contaminated facilities. Part C of Vols. 1 and 2 focuses on WM. Each part of Vol. 1 contains an overview of the TM, an explanation of the problems facing the volume-specific program, a review of identified technologies, and rankings of technologies applicable to the site. Volume 2 (Pts. A. B. and C) contains the logic linkages among EM goals, environmental problems, and the various technologies that have the potential to solve these problems. Volume 3 (Pts. A. B, and C) contains the TLD data sheets. This volume provides the technology evaluation data sheets (TEDS) for ER/WM activities (D&D, RA and WM) that are referenced by a TEDS code number in Vol. 2 of the TLD. Each of these sheets represents a single logic trace across the TLD. These sheets contain more detail than is given for the technologies in Vol. 2.

Not Available

1993-09-01T23:59:59.000Z

386

Hydro-Quebec Sustainable Development Action Plan 2009-2013 (Quebec, Canada)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hydro-Quebec Sustainable Development Action Plan 2009-2013 (Quebec, Hydro-Quebec Sustainable Development Action Plan 2009-2013 (Quebec, Canada) Hydro-Quebec Sustainable Development Action Plan 2009-2013 (Quebec, Canada) < Back Eligibility Utility Savings Category Buying & Making Electricity Water Solar Program Info Funding Source Hydro-Quebec State Quebec Program Type Renewables Portfolio Standards and Goals To meet the requirements set out in the Québec government's Sustainable Development Strategy and strategy to ensure the occupancy and vitality of territories, Hydro-Québec has established a Sustainable Development Action Plan for the 2013-2016 period. Published in March 2013, this second action plan ensures the continuation of the efforts initiated by the first plan, which covered the 2009-2013 period. The plan outlines 10 major

387

Remedial Action Assessment System (RAAS): Evaluation of selected feasibility studies of CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act) hazardous waste sites  

SciTech Connect

Congress and the public have mandated much closer scrutiny of the management of chemically hazardous and radioactive mixed wastes. Legislative language, regulatory intent, and prudent technical judgment, call for using scientifically based studies to assess current conditions and to evaluate and select costeffective strategies for mitigating unacceptable situations. The NCP requires that a Remedial Investigation (RI) and a Feasibility Study (FS) be conducted at each site targeted for remedial response action. The goal of the RI is to obtain the site data needed so that the potential impacts on public health or welfare or on the environment can be evaluated and so that the remedial alternatives can be identified and selected. The goal of the FS is to identify and evaluate alternative remedial actions (including a no-action alternative) in terms of their cost, effectiveness, and engineering feasibility. The NCP also requires the analysis of impacts on public health and welfare and on the environment; this analysis is the endangerment assessment (EA). In summary, the RI, EA, and FS processes require assessment of the contamination at a site, of the potential impacts in public health or the environment from that contamination, and of alternative RAs that could address potential impacts to the environment. 35 refs., 7 figs., 1 tab.

Whelan, G. (Pacific Northwest Lab., Richland, WA (USA)); Hartz, K.E.; Hilliard, N.D. (Beck (R.W.) and Associates, Seattle, WA (USA))

1990-04-01T23:59:59.000Z

388

U.S.-Canada Clean Energy Dialogue (CED) Action Plan II  

Energy.gov (U.S. Department of Energy (DOE))

Action Plan II describes initiatives that the U.S.-Canada Clean Energy Dialogue Working Groups plan to implement under Phase II of the CED to further progress toward a low-carbon economy that...

389

E-Print Network 3.0 - action plan 12-01-1998 Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

effective dated row is the student's Summary: : Insert a new effective dated row. Enter the program action of PLNC (Plan Change). Re-enter the admit... Plan: Insert a new...

390

E-Print Network 3.0 - action plan work Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

work Search Powered by Explorit Topic List Advanced Search Sample search results for: action plan work Page: << < 1 2 3 4 5 > >> 1 The two faces of plan repair Roman van der Krogt...

391

E-Print Network 3.0 - action plan municipality Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

TREATMENT AND DISPOSAL IN THACHIN, Summary: successfully. 12;iii Abstract At present, Thailand does not have action plan and appropriate policy for Fecal... and Transportation...

392

E-Print Network 3.0 - action plan annual Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Unless Noted Otherwise) Reviewed By Mechanism & Frequency For Review Action... Annual Mtg. (October) Annual Retreat (August) CI Plan Faculty Professional Development...

393

E-Print Network 3.0 - action plans workshop Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

for a range of planning... of friendly units not engaged who can take action to repair the ... Source: Levine, John - Department of Computer and Information Sciences,...

394

Corrective Action Investigation plan for Corrective Action Unit 263: Area 25 Building 4839 Leachfield, Nevada Test Site, Nevada, March 1999  

SciTech Connect

The Corrective Action Investigation Plan for Corrective Action Unit 263, the Area 25 Building 4839 Leachfield, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the US Department of Energy, Nevada Operations Office; the Nevada Division of Environmental Protection; and the US Department of Defense. Corrective Action Unit 263 is comprised of the Corrective Action Site 25-05-04 sanitary leachfield and associated collection system. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998d). The Leachfield Work Plan was developed to streamline investigations at Leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 263. Corrective Action Unit 263 is located southwest of Building 4839, in the Central Propellant Storage Area. Operations in Building 4839 from 1968 to 1996 resulted in effluent releases to the leachfield and associated collection system. In general, effluent released to the leachfield consisted of sanitary wastewater from a toilet, urinal, lavatory, and drinking fountain located within Building 4839. The subsurface soils in the vicinity of the collection system and leachfield may have been impacted by effluent containing contaminants of potential concern generated by support activities associated with the Building 4839 operations.

ITLV

1999-03-01T23:59:59.000Z

395

Study of Long-Term Transport Action Plan for ASEAN | Open Energy  

Open Energy Info (EERE)

Long-Term Transport Action Plan for ASEAN Long-Term Transport Action Plan for ASEAN Jump to: navigation, search Name Study of Long-Term Transport Action Plan for ASEAN Agency/Company /Organization Association of Southeast Asian Nations (ASEAN), Institution for Transport Policy Studies (ITPS), Clean Air Asia, Transport Research Laboratory (TRL), Mizuho Information & Research Institute (MHIR) Partner Nippon Foundation, Ministry of Planning, Ministry of Transport Sector Climate, Land Focus Area Greenhouse Gas, People and Policy, Transportation Topics Background analysis, Baseline projection, Co-benefits assessment, - Environmental and Biodiversity, GHG inventory, Low emission development planning, -LEDS, Pathways analysis, Policies/deployment programs Website http://cleanairinitiative.org/

396

ERRATA SHEET for Corrective Action Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada  

SciTech Connect

Section 2.1.1.3 of the Table of Contents reference on Page v and on Page 12 of the Corrective Action Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada erroneously refers to the Nevada Environmental Policy Act Determination. The correct title of the referenced document is the National Environmental Policy Act Determination.

K. B. Campbell

2002-04-01T23:59:59.000Z

397

A Framework for Sustainable Remediation  

Science Journals Connector (OSTI)

However, after more than 30 years of experience with remediation projects, it is now clear that remedial actions are frequently energy intensive, may produce their own pollutant emissions, and may disturb and cause controversy in neighboring communities. ... Regulators, industry, and communities recognize that sustainability principles must be integrated into remediation activities, and various sustainable remediation guidance documents have been developed. ...

Karin S. Holland

2011-08-11T23:59:59.000Z

398

USDA & DOE Release National Biofuels Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

USDA & DOE Release National Biofuels Action Plan USDA & DOE Release National Biofuels Action Plan USDA & DOE Release National Biofuels Action Plan October 7, 2008 - 4:14pm Addthis WASHINGTON - Department of Agriculture (USDA) Secretary Ed Schafer and Department of Energy (DOE) Secretary Samuel W. Bodman today released the National Biofuels Action Plan (NBAP), an interagency plan detailing the collaborative efforts of Federal agencies to accelerate the development of a sustainable biofuels industry. "Federal leadership can provide the vision for research, industry and citizens to understand how the nation will become less dependent on foreign oil and create strong rural economies," Secretary Schafer said. "This National Biofuels Action Plan supports the drive for biofuels growth to

399

Ecuador-Quito City Climate Change Action Plan | Open Energy Information  

Open Energy Info (EERE)

Ecuador-Quito City Climate Change Action Plan Ecuador-Quito City Climate Change Action Plan Jump to: navigation, search Name Ecuador-Quito City Climate Change Action Plan Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development Partner Ministry of Environment Sector Climate Topics Background analysis, Low emission development planning, Pathways analysis Website http://resilient-cities.iclei. Country Ecuador UN Region South America References CDKN-Ecuador-Quito City Climate Change Action Plan[1] Ecuador-Quito City Climate Change Action Plan Screenshot In the last 100 years, Quito has experienced an average temperature increase of 1.2°C to 1.4°C. The change in the city's climate patterns affects ecosystems, infrastructure, water availability, human health,

400

CDKN-Ecuador-Quito City Climate Change Action Plan | Open Energy  

Open Energy Info (EERE)

Quito City Climate Change Action Plan Quito City Climate Change Action Plan Jump to: navigation, search Name CDKN-Ecuador-Quito City Climate Change Action Plan Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development Partner Ministry of Environment Sector Climate Topics Background analysis, Low emission development planning, Pathways analysis Website http://resilient-cities.iclei. Country Ecuador UN Region South America References CDKN-Ecuador-Quito City Climate Change Action Plan[1] CDKN-Ecuador-Quito City Climate Change Action Plan Screenshot In the last 100 years, Quito has experienced an average temperature increase of 1.2°C to 1.4°C. The change in the city's climate patterns affects ecosystems, infrastructure, water availability, human health,

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Remedial actions at the former Vitro Rare Metals plant site, Canonsburg, Washington County, Pennsylvania. Final Environmental Impact Statement. Volume I  

SciTech Connect

The environmental impacts associated with remedial actions in connection with residual radioactive materials remaining at the inactive uranium processing site located in Canonsburg, Washington County, Pennsylvania are evaluated. The Canonsburg site is an 18.5-acre property that was formerly owned by the Vitro Rare Metals Company. The expanded Canonsburg site would be 30-acre property that would include the Canonsburg site (the former Vitro Rare Metals plant), seven adjacent private houses, and the former Georges Pottery property. During the period 1942 through 1957 the Vitro Manufacturing Company and its successor, the Vitro Corporation of America, processed onsite residues and ores, and government-owned ores, concentrates, and scraps to extract uranium and other rare metals. The Canonsburg site is now the Canon Industrial Park. In addition to storing the residual radioactive materials of this process at the Canonsburg site, about 12,000 tons of radioactively contaminated materials were transferred to a railroad landfill in Burrell Township, Indiana County, Pennsylvania. This Canonsburg FEIS evaluates five alternatives for removing the potential public health hazard associated with the radioactively contaminated materials. In addition to no action, these alternatives involve various combinations of stabilization of the radioactively contaminated materials in place or decontamination of the Canonsburg and Burrell sites by removing the radioactively contaminated materials to another location. In addition to the two sites mentioned, a third site located in Hanover Township, Washington County, Pennsylvania has been considered as a disposal site to which the radioactively contaminated materials presently located at either of the other two sites might be moved.

Not Available

1983-07-01T23:59:59.000Z

402

Superfund Record of Decision (EPA Region 7): Cherokee County/Galena, Kansas (Second remedial action), September 1989  

SciTech Connect

The Cherokee County site is a lead and zinc mining area in the southeastern corner of Kansas. The 25 square-mile Galena subsite is one of six subsites within the Cherokee County site and consists of large areas covered by mine wastes, water-filled subsidence craters, and open mine shafts. The approximately 3,500 Galena residents receive their water supply from two deep aquifer wells. EPA began investigations of the Galena subsite in 1985 and determined that the shallow ground-water aquifer and surface water were contaminated with elevated concentrations of metals. EPA Region VII responded by installing water-treatment units on several private wells. The primary contaminants of concern affecting the ground water and surface water are metals including cadmium, lead, and zinc. The selected remedial action for the site includes the removal, consolidation, and onsite placement in mine pits, shafts, and subsidences of surface mine wastes; diversion and channelization of surface streams with recontouring and vegetation of land surface; and investigation of deep aquifer well quality.

Not Available

1989-09-18T23:59:59.000Z

403

Test Area for Remedial Actions (TARA) site characterization and dynamic compaction of low-level radioactive waste trenches  

SciTech Connect

As part of a low-level radioactive waste burial ground stabilization and closure technology demonstration project, a group of five burial trenches in Oak Ridge National Laboratory (ORNL) Solid Waste Storage Area (SWSA) 6 was selected as a demonstration site for testing trench compaction, trench grouting, and trench cap installation and performance. This report focuses on site characterization, trench compaction, and grout-trench leachate compatibility. Trench grouting and cap design and construction will be the subject of future reports. The five trenches, known as the Test Area for Remedial Actions (TARA) site, are contained within a hydrologically isolated area of SWSA 6; for that reason, any effects of stabilization activities on site performance and groundwater quality will be separable from the influence of other waste disposal units in SWSA 6. To obviate the chronic problem of burial trench subsidence and to provide support for an infiltration barrier cap, these five trenches were dynamically compacted by repeated dropping of a 4-ton weight onto each trench from heights of approximately 7 m.

Davis, E.C.; Spalding, B.P.; Lee, S.Y.; Hyder, L.K.

1989-01-01T23:59:59.000Z

404

Superfund Record of Decision (EPA Region 3): Lansdowne Radiation Site, Lansdowne, Pennsylvania (second remedial action), September 1986. Final report  

SciTech Connect

The Lansdowne Radiation site consists of two attached residences located at 105/107 East Stratford Avenue, Lansdowne, PA. The building is located in a residential area, approximately two miles from Philadelphia. The dwellings were contaminated with radium and other radionuclides between 1924 and 1944 as a result of refining radium and producing medical devices. A decontamination effort in 1964 consisted of removing as much radium as practical by sending, scraping, vacuuming, and washing the house walls, floors and ceilings. Some concrete floor and wooden floor boards were also removed. It is postulated that the acid fumes from the radium purification procedure used, as well as spills, carried the radium contamination deep into the wood and plaster of the home. The remedial action includes dismantling of the house. All radioactive materials above established permissible levels will be packed and sealed in approved containers, and disposed of at an approved offsite disposal facility; contaminated soil located in and around the house will be excavated and removed to established permissible levels. The sewer lateral leading from the contaminated house to Stratford Avenue will be removed and replaced. The capital cost has been estimated at $4,000,000-$4,500,000.

Not Available

1986-09-22T23:59:59.000Z

405

Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington  

SciTech Connect

Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

Not Available

1992-09-01T23:59:59.000Z

406

Field Sampling and Analysis Plan for the Remedial Investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Responses to comments  

SciTech Connect

This report provides responses to US Environmental Protection Agency Region IV EPA-M and Tennessee Department of Environment and Conservation Oversite Division (TDEC-O) comments on report ORNL/ER-58, Field Sampling and Analysis Plan for the Remedial Investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Waste Area Grouping (WAG) 2 consists of the White Oak Creek (WOC) drainage system downgradient of the major ORNL WAGs in the WOC watershed. A strategy for the remedial investigation (RI) of WAG2 was developed in report ES/ER-14&Dl, Remedial Investigation Plan for Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. This strategy takes full advantage of WAG2`s role as an integrator of contaminant releases from the ORNL WAGs in the WOC watershed, and takes full advantage of WAG2`s role as a conduit for contaminants from the ORNL site to the Clinch River. The strategy calls for a multimedia environmental monitoring and characterization program to be conducted in WAG2 while upgradient contaminant sources are being remediated. This monitoring and characterization program will (1) identify and quantify contaminant fluxes, (2) identify pathways of greatest concern for human health and environmental risk, (3) improve conceptual models of contaminant movement, (4) support the evaluation of remedial alternatives, (5) support efforts to prioritize sites for remediation, (6) document the reduction in contaminant fluxes following remediation, and (7) support the eventual remediation of WAG2. Following this strategy, WAG2 has been termed an ``integrator WAG,`` and efforts in WAG2 over the short term are directed toward supporting efforts to remediate the contaminant ``source WAGS`` at ORNL.

Not Available

1992-10-01T23:59:59.000Z

407

PPPL Corrective Action Plan 11/23/2011 Page 1 of 4  

E-Print Network (OSTI)

PPPL Corrective Action Plan 11/23/2011 Page 1 of 4 22 November 2011 PUPPPL Corrective, please contact Ron Strykowsky at rstrykow@pppl.gov CAR01: Acceleration of schedule and added scope will be approved by DOEPSO and DOEOFES. #12;PPPL Corrective Action Plan 11/23/2011 Page 2 of 4 CAR02

Princeton Plasma Physics Laboratory

408

2011 Bioenergy Action Plan Prepared by the California Energy Commission for the  

E-Print Network (OSTI)

2011 Bioenergy Action Plan Prepared by the California Energy Commission for the Bioenergy Commission Renewables Committee as part of the Preparation of the 2011 Bioenergy Action Plan ­ docket # 10 policy of the Energy Commission until the report is adopted. #12;i ACKNOWLEDGEMENTS The 2011 Bioenergy

409

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 130: Storage Tanks, Nevada Test Site, Nevada, Revision 0  

SciTech Connect

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 130, Storage Tanks, identified in the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended February 2008). Corrective Action Unit 130 consists of the seven following corrective action sites (CASs) located in Areas 1, 7, 10, 20, 22, and 23 of the Nevada Test Site: 01-02-01, Underground Storage Tank 07-02-01, Underground Storage Tanks 10-02-01, Underground Storage Tank 20-02-03, Underground Storage Tank 20-99-05, Tar Residue 22-02-02, Buried UST Piping 23-02-07, Underground Storage Tank This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 130 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The sites will be investigated based on the data quality objectives (DQOs) finalized on April 3, 2008, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each CAS in CAU 130. The DQO process developed for this CAU identified the following expected closure options: (1) investigation and confirmation that no contamination exists above the final action levels, leading to a no further action declaration; (2) characterization of the nature and extent of contamination, leading to closure in place with use restrictions; or (3) clean closure by remediation and verification. The following text summarizes the SAFER activities that will support the closure of CAU 130: Perform site preparation activities (e.g., utilities clearances, geophysical surveys). Move or remove and dispose of debris at various CASs, as required. Collect environmental samples from designated target populations (e.g., stained soil) to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information. If no COCs are present at a CAS, establish no further action as the corrective action. If COCs exist, collect environmental samples from designated target populations (e.g., clean soil adjacent to contaminated soil) and submit for laboratory analyses to define the extent of COC contamination. If a COC is present at a CAS, either: - Establish clean closure as the corrective action. The material to be remediated will be removed, disposed of as waste, and verification samples will be collected from remaining soil, or - Establish closure in place as the corrective action and implement the appropriate use restrictions. Obtain consensus from NDEP that the preferred closure option is sufficient to protect human health and the environment. Close the underground storage tank(s) and their contents, if any, in accordance with Nevada Administrative Code regulations. Remove the lead brick(s) found at any CAS in accordance with the Resource Conservation and Recovery Act.

Alfred Wickline

2008-07-01T23:59:59.000Z

410

United States and Japan Sign Joint Nuclear Energy Action Plan to Promote  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Japan Sign Joint Nuclear Energy Action Plan to Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy Cooperation United States and Japan Sign Joint Nuclear Energy Action Plan to Promote Nuclear Energy Cooperation April 25, 2007 - 12:36pm Addthis WASHINGTON, DC - United States Department of Energy Secretary Samuel W. Bodman and Japan's Ministers Akira Amari, Bunmei Ibuki, and Taro Aso, this week presented to U.S. President George W. Bush and Japanese Prime Minister Shinzo Abe, the United States-Japan Joint Nuclear Energy Action Plan. The Action Plan - a product of extensive negotiations between the U.S. and Japan - provides a framework for increased collaboration in nuclear energy. It builds upon the significant, longstanding civilian nuclear cooperation between the two nations and will contribute to increasing

411

EIS-0425: Record of Decision and Mitigation Action Plan | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

5: Record of Decision and Mitigation Action Plan 5: Record of Decision and Mitigation Action Plan EIS-0425: Record of Decision and Mitigation Action Plan Bonneville Power Administration Record of Decision and Mitigation Action Plan for the Mid-Columbia Restoration Project BPA decided to implement the Proposed Action of the Mid-Columbia Coho Restoration Program as described in the Mid-Columbia Coho Restoration Program Final Environmental Impact Statement (EIS) (DOE/EIS-0425, March 2012). BPA will fund the construction, operation, and maintenance of a coho slamon restoration program sponsored by the Confederated Tribes and Bands of the Yakama Nation to help mitigate impacts to fish affected by the Federal Columbia River Power System dams on the Columbia River. The Proposed Action will involve building a new, small, in-basin adult

412

Tank waste remediation system privatization phase I infrastructure and project W-519 and QA implementation plan  

SciTech Connect

This document has been prepared to identify the quality requirements for all products/activities developed by or for Project W-519. This plan is responsive to the Numatec Hanford Corporation, Quality Assurance Program Plan, NHC-MP-001.

HUSTON, J.J.

1999-08-19T23:59:59.000Z

413

Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada  

SciTech Connect

Corrective Action Unit (CAU) 543: Liquid Disposal Units is listed in Appendix III of the ''Federal Facility Agreement and Consent Order'' (FFACO) which was agreed to by the state of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (FFACO, 1996). CAU 543 sites are located in Areas 6 and 15 of the Nevada Test Site (NTS), which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 543 consists of the following seven Corrective Action Sites (CASs) (Figure 1): CAS 06-07-01, Decon Pad; CAS 15-01-03, Aboveground Storage Tank; CAS 15-04-01, Septic Tank; CAS 15-05-01, Leachfield; CAS 15-08-01, Liquid Manure Tank; CAS 15-23-01, Underground Radioactive Material Area; and CAS 15-23-03, Contaminated Sump, Piping. All Area 15 CASs are located at the former U.S. Environmental Protection Agency (EPA) Farm, which operated from 1963 to 1981 and was used to support animal experiments involving the uptake of radionuclides. Each of the Area 15 CASs, except CAS 15-23-01, is associated with the disposal of waste effluent from Building 15-06, which was the primary location of the various tests and experiments conducted onsite. Waste effluent disposal from Building 15-06 involved piping, sumps, outfalls, a septic tank with leachfield, underground storage tanks, and an aboveground storage tank (AST). CAS 15-23-01 was associated with decontamination activities of farm equipment potentially contaminated with radiological constituents, pesticides, and herbicides. While the building structures were removed before the investigation took place, all the original tanks, sumps, piping, and concrete building pads remain in place. The Area 6 CAS is located at the Decontamination Facility in Area 6, a facility which operated from 1971 to 2001 and was used to decontaminate vehicles, equipment, clothing, and other materials that had become contaminated during nuclear testing activities. The CAS includes the effluent collection and distribution systems for Buildings 6-605, 6-606, and 6-607, which consists of septic tanks, sumps, piping, floor drains, drain trenches, cleanouts, and a concrete foundation. Additional details of the site history are provided in the CAU 543 Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2004a), and the CAU 543 Corrective Action Decision Document (CADD) (NNSA/NSO, 2005).

NSTec Environmental Restoration

2007-04-01T23:59:59.000Z

414

PRE-DESIGN INVESTIGATION WORK PLAN FOR COLDWATER CREEK FROM  

E-Print Network (OSTI)

Formerly Utilized Sites Remedial Action Program #12;#12;REVISION 0 PRE-DESIGN INVESTIGATION WORK PLANREVISION 0 PRE-DESIGN INVESTIGATION WORK PLAN FOR COLDWATER CREEK FROM FROST AVENUE TO ST. DENIS.S. Army Corps of Engineers, St. Louis District Office, Formerly Utilized Sites Remedial Action Program

US Army Corps of Engineers

415

St. Louis Airport Site. Annual site environmental report, calendar year 1985. Formerly Utilized Sites Remedial Action Program (FUSRAP). Revision 1  

SciTech Connect

During 1985, the environmental monitoring program was continued at the St. Louis Airport Site (SLAPS) in St. Louis County, Missouri. The ditches north and south of the site have been designated for cleanup as part of the Formerly Utilized Sites Remedial Action Program (FUSRAP). The monitoring program at the SLAPS measures radon gas concentrations in air; external gamma radiation dose rates; and uranium, thorium, and radium concentrations in surface water, groundwater, and sediment. Potential radiation doses to the public are also calculated. Because the site is not controlled or regulated by the DOE, the DOE Derived Concentration Guides (DCGs) are not applicable to SLAPS, but are included only as a basis for comparison. The DOE DCGs and the DOE radiation protection standard have been revised. (Appendix B). During 1985, annual average radon levels in air at the SLAPS were below the DCG for uncontrolled areas. External gamma monitoring in 1985 showed measured annual gamma dose rates ranging from 3 to 2087 mrem/y, with the highest value occurring in an area known to be contaminated. The calculated maximum dose at the site boundary, assuming limited occupancy, would be 6 mrem/y. Average annual concentrations of /sup 230/Th, /sup 226/Ra, and total uranium in surface waters remained below the DOE DCG. The on-site groundwater measurements showed that average annual concentrations of /sup 230/Th, /sup 226/Ra and total uranium were within the DOE DCGs. Although there are no DCGs for sediments, all concentrations of total uraniu, /sup 230/Th, and /sup 226/Ra were below the FUSRAP Guidelines.

Not Available

1986-09-01T23:59:59.000Z

416

Applicable or Relevant and Appropriate Requirements (ARARs) for Remedial Action at the Oak Ridge Reservation: A compendium of major environmental laws. Environmental Restoration Program  

SciTech Connect

Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances must comply with applicable or relevant and appropriate requirements (ARARS) or standards under federal and state environmental laws. The US Department of Energy (DOE) Oak Ridge Reservation (ORR) was placed on the National Priorities List by the US Environmental Protection Agency (EPA) on November 21, 1989, effective December 21, 1989. As a result of this listing, DOE, EPA, and the Tennessee Department of Environment and Conservation have signed a Federal Facility Agreement (FFA) for the environmental restoration of the ORR. Section XXI(F) of the FFA calls for the preparation of a draft listing of all ARARs as mandated by CERCLA {section}121. This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at the ORR. A description of the terms ``applicable`` and ``relevant and appropriate`` is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Tennessee are listed in tables. In addition, the major provisions of the Resource Conservation and Recovery Act, the Safe Drinking Water Act, the Clean Water Act, the Clean Air and other acts, as they apply to hazardous waste cleanup, are discussed. In the absence of ARARS, CERCLA {section}121 provides for the use of nonpromulgated federal criteria, guidelines, and advisories in evaluating the human risk associated with remedial action alternatives. Such nonpromulgated standards are classified as ``to-be-considered`` (TBC) guidance. A ion of available guidance is given; summary tables fist the available federal standards and guidance information. In addition, the substantive contents of the DOE orders as they apply to remediation of radioactively contaminated sites are discussed as TBC guidance.

Etnier, E.L.; McDonald, E.P.; Houlberg, L.M.

1993-07-01T23:59:59.000Z

417

South Africa-Mitigation Action Plans and Scenarios (MAPS) | Open Energy  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » South Africa-Mitigation Action Plans and Scenarios (MAPS) Jump to: navigation, search Logo: Argentina-Mitigation Action Plans and Scenarios (MAPS) Name Argentina-Mitigation Action Plans and Scenarios (MAPS) Agency/Company /Organization The Children's Investment Fund Foundation, SouthSouthNorth, University of Cape Town-Energy Research Centre, Danish Government Sector Climate, Energy Topics Baseline projection, Low emission development planning, -LEDS, -NAMA, Pathways analysis Website http://www.mapsprogramme.org Program Start 2010 Program End 2013 Country South Africa Southern Africa References Mitigation Action Plans and Scenarios (MAPS)[1] Contents 1 Overview 2 MAPS Processes and Outcomes 2.1 Chile

418

CDKN-Kenya-Action Plan for National Climate Change Response Strategy | Open  

Open Energy Info (EERE)

Kenya-Action Plan for National Climate Change Response Strategy Kenya-Action Plan for National Climate Change Response Strategy Jump to: navigation, search Name CDKN-Kenya-Action Plan for National Climate Change Response Strategy Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development Partner Ministry of Environment and Mineral Resources on behalf of the National CC Task Force, HTSPE, IDLA, LTS International/ ACCLIMATISE, IISD, Adam Smith International +subcontractors Sector Climate, Energy, Land Topics Background analysis, Low emission development planning, Market analysis, Pathways analysis Website http://cdkn.org/2011/04/an-act Program Start 2010 Program End 2012 Country Kenya UN Region Eastern Africa References CDKN-Kenya-Action Plan for National Climate Change Response Strategy[1]

419

Corrective Action Investigation Plan for Corrective Action Unit 554: Area 23 Release Site, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 554: Area 23 Release Site, Nevada Test Site, Nevada. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 554 is located in Area 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 554 is comprised of one Corrective Action Site (CAS), which is: 23-02-08, USTs 23-115-1, 2, 3/Spill 530-90-002. This site consists of soil contamination resulting from a fuel release from underground storage tanks (USTs). Corrective Action Site 23-02-08 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for this CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document for CAU 554. Corrective Action Site 23-02-08 will be investigated based on the data quality objectives (DQOs) developed on July 15, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; and contractor personnel. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 554.

David A. Strand

2004-10-01T23:59:59.000Z

420

Tank waste remediation system privatization phase 1 infrastructure project W-519, project execution plan  

SciTech Connect

This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented.

Parazin, R.J.

1998-08-28T23:59:59.000Z

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

EIS-0132: Remedial Actions at the Former Union Carbide Corp. Uranium Mill Sites, Rifle, Garfield County, Colorado  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy developed this statement to evaluate and compare the environmental impacts of remediating the residual radioactive materials left at the inactive uranium tailing sites in Rifle, Colorado.

422

EIS-0126: Remedial Actions at the Former Climax Uranium Company Uranium Mill Site, Grand Junction, Mesa County, Colorado  

Energy.gov (U.S. Department of Energy (DOE))

The U.S. Department of Energy developed this EIS to assess the environmental impacts of remediating the residual radioactive materials left from the inactive uranium processing site and associated properties located in Grand Junction, Colorado.

423

Consideration of Reliability in System Design for Ground Water Remediation  

Science Journals Connector (OSTI)

A remedial action design system is described that may be used to evaluate candidate remediation systems and select the preferred alternative under conditions of uncertainty. The remedial action design method i...

W. Woldt; I. Bogardi; L. Duckstein

1991-01-01T23:59:59.000Z

424

What you find is not always what you fixHow other aspects than causes of accidents decide recommendations for remedial actions  

Science Journals Connector (OSTI)

In accident investigation, the ideal is often to follow the principle what-you-find-is-what-you-fix, an ideal reflecting that the investigation should be a rational process of first identifying causes, and then implement remedial actions to fix them. Previous research has however identified cognitive and political biases leading away from this ideal. Somewhat surprisingly, however, the same factors that often are highlighted in modern accident models are not perceived in a recursive manner to reflect how they influence the process of accident investigation in itself. Those factors are more extensive than the cognitive and political biases that are often highlighted in theory. Our purpose in this study was to reveal constraints affecting accident investigation practices that lead the investigation towards or away from the ideal of what-you-find-is-what-you-fix. We conducted a qualitative interview study with 22 accident investigators from different domains in Sweden. We found a wide range of factors that led investigations away from the ideal, most which more resembled factors involved in organizational accidents, rather than reflecting flawed thinking. One particular limitation of investigation was that many investigations stop the analysis at the level of preventable causes, the level where remedies that were currently practical to implement could be found. This could potentially limit the usefulness of using investigations to get a view on the big picture of causes of accidents as a basis for further remedial actions.

Jonas Lundberg; Carl Rollenhagen; Erik Hollnagel

2010-01-01T23:59:59.000Z

425

Colonie Interim Storage Site: Annual site environmental report, Colonie, New York, Calendar year 1986: Formerly Utilized Sites Remedial Action Program (FUSRAP)  

SciTech Connect

During 1986, the environmental monitoring program continued at the Colonie Interim Storage Site (CISS), a US Department of Energy (DOE) facility located in Colonie, New York. The CISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has mandated DOE to remedy. As part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Appropriations Act, remedial action is being conducted at the site and at vicinity properties by Bechtel National Inc. (BNI), Project Management Contractor for FUSRAP. The environmental monitoring program is also carried out by BNI. The monitoring program at the CISS measures external gamma radiation levels as well as uranium and radium-226 concentrations in surface water, groundwater, and sediment. To verify that the site is in compliance with the DOE radiation protection standard and to assess the potential effect of the site on public health, the radiation dose was calculated for the maximally exposed individual. Based on the conservative scenario described in the report, the maximally exposed individual would receive an annual external exposure approximately equivalent to 5% of the DOE radiation protection standard of 100 mrem/y. Results of 1986 monitoring show that the CISS is in compliance with the DOE radiation protection standard. 14 refs., 9 figs., 9 tabs.

Not Available

1987-06-01T23:59:59.000Z

426

Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect

Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): 05-23-02, GMX Alpha Contaminated Area 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives.

Matthews, Patrick

2014-05-01T23:59:59.000Z

427

Superfund Record of Decision (EPA Region 4): Ciba-Geigy (McIntosh Plant), AL. (First remedial action), September 1989  

SciTech Connect

The 1,500-acre Ciba-Geigy (McIntosh Plant) site is in southern Washington County, northeast of McIntosh, Alabama. The plant's initial operations, which began in 1952, were devoted solely to the manufacture of DDT. In 1970, the facility expanded its manufacturing operations to include herbicides, insecticides, and chelating and sequestering agents. Other products produced by Ciba-Geigy include resins and additives used in the plastics industry. Wastes and residues generated during production operations were managed onsite. In 1985, EPA issued Ciba-Geigy a RCRA Part B permit for active waste-management units onsite. The permit included a corrective-action plan requiring Ciba-Geigy to remove and treat contaminated ground water and surface water at the site. In 1987, as part of this plan, Ciba-Geigy installed a ground-water pumping and treatment system which has been effective in addressing the ground-water contamination. The primary contaminants of concern affecting the ground-water are VOCs including benzene and toluene; other organics including pesticides; and metals including arsenic.

Not Available

1989-09-28T23:59:59.000Z

428

REMEDIAL ACTION WORK PLAN FOR THE MAYI'IOOD SITE JULY I9B4 UNITED...  

Office of Legacy Management (LM)

I9B4 UNITED STATES DEPARTMENT OF ENERGY OAK RIDGE OPERATIONS TABLE OF CONTENTS 1 . 0 I n t r o d u c t i o n a n d O b j e c t i v e s l . I B a c k g r o u n d L . 2 S i t e l d...

429

Superfund Record of Decision (EPA Region 4): Maxey Flats Nuclear Disposal site, Fleming County, KY. (First remedial action), September 1991. Final report  

SciTech Connect

The 280-acre Maxey Flats Nuclear Disposal site is an inactive low-level radioactive waste disposal facility in Fleming County, Kentucky. The estimated 663 people who reside within 2.5 miles of the site use the public water supply for drinking purposes. From 1962 to 1977, Nuclear Engineering Company, Inc. (NECO), operated a solid by-product, source, and special nuclear material disposal facility under a license with the State. Several State investigations in the 1970's revealed that leachate contaminated with tritium and other radioactive substances was migrating from the disposal trenches to unrestricted areas. The Record of Decision (ROD) addresses final remediation of soil, debris, and associated leachate. The primary contaminants of concern affecting the soil and debris are VOCs including benzene, TCE, and toluene; metals including arsenic and lead; and radioactive materials. The selected remedial action for the site is included.

Not Available

1991-09-30T23:59:59.000Z

430

EIS-0460: Mitigation Action Plan | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

those required mitigation actions and the monitoring and reporting requirements the Alliance must implement during the design, construction, and operation of the FutureGen 2.0...

431

Corrective Action Decision Document/ Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface Central Nevada Test Area, Nevada, Rev. No. 0  

SciTech Connect

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the subsurface at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, CNTA - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). CAU 443 is located in Hot Creek Valley in Nye County, Nevada, north of U.S. Highway 6, about 48 kilometers north of Warm Springs, Nevada. The CADD/CAP combines the decision document (CADD) with the corrective action plan (CAP) and provides or references the specific information necessary to recommend corrective actions for the UC-1 Cavity (Corrective Action Site 58-57-001) at CAU 443, as provided in the FFACO. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at CNTA. To achieve this, the following tasks were required: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend a preferred corrective action alternative for the subsurface at CNTA. A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first involved the gathering and interpretation of geologic and hydrogeologic data into a three-dimensional numerical model of groundwater flow, and use of the output of the flow model for a transport model of radionuclide release and migration behavior (Pohlmann et al., 2000). The second modeling phase (known as a Data Decision Analysis [DDA]) occurred after the Nevada Division of Environmental Protection reviewed the first model and was designed to respond to concerns regarding model uncertainty (Pohll and Mihevc, 2000). The third modeling phase updated the original flow and transport model to incorporate the uncertainty identified in the DDA, and focused the model domain on the region of interest to the transport predictions. This third phase culminated in the calculation of contaminant boundaries for the site (Pohll et al., 2003).

Susan Evans

2004-11-01T23:59:59.000Z

432

Corrective Action Investigation Plan for Corrective Action Unit 145: Wells and Storage Holes, Nevada Test Site, Nevada, Rev. No.: 0  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) contains project-specific information for conducting site investigation activities at Corrective Action Unit (CAU) 145: Wells and Storage Holes. Information presented in this CAIP includes facility descriptions, environmental sample collection objectives, and criteria for the selection and evaluation of environmental samples. Corrective Action Unit 145 is located in Area 3 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 145 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-20-01, Core Storage Holes; (2) 03-20-02, Decon Pad and Sump; (3) 03-20-04, Injection Wells; (4) 03-20-08, Injection Well; (5) 03-25-01, Oil Spills; and (6) 03-99-13, Drain and Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. One conceptual site model with three release scenario components was developed for the six CASs to address all releases associated with the site. The sites will be investigated based on data quality objectives (DQOs) developed on June 24, 2004, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and Bechtel Nevada. The DQOs process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 145.

David A. Strand

2004-09-01T23:59:59.000Z

433

FORMERLY U T I L I Z E D MED/AEC S I T E S REMEDIAL ACTION PROGRAM  

Office of Legacy Management (LM)

U U T I L I Z E D MED/AEC S I T E S REMEDIAL ACTION PROGRAM RADIOLOGICAL SURVEY KENT CHEMICAL LAI3OMTORY U N I V E R S I T Y OF CHICAGO CHICAGO, I L L I N O I S September 7 - 1 3 , 1 9 7 7 Conducted by: Argonne N a t i o n a l L a b o r a t o r y . >IED/AEC Resurvey Group H e a l t h P h y s i c s S e c t i o n O c c u p a t i o n a l H e a l t h & S a f e t y D i v i s i o n f o r t h e : U . S . Department of Energy under Budget A c t i v i t y ERDA RK-01-05-02-3 and ANL 73706 C o n t r a c t Number W-31-109-ENG-38. The s u b m i t t e d m a n u s c r i p t has been z u t h o r i z e d by a c o n t r a c t o r of t h e U. S . Government under c o n t r a c t No. W-31-109-ENG-38. A c c o r d i n g l y , t h e U. S . Governzent r e t a i n s a noriexclusive, r c y a l t y - f r e e l i c e n s e t o p u b l i s h o r r e p r o d u c e t h e p u b l i s h e d form of t h i s c o n t r i b u t i o n , o r a l l o w o t h e r s t o do s o , f o r t h e U. S. Government p u r p ~ s e s . DRAFT C O P Y

434

Vietnam-Integrated Action Plan to Reduce Vehicle Emissions | Open Energy  

Open Energy Info (EERE)

Vietnam-Integrated Action Plan to Reduce Vehicle Emissions Vietnam-Integrated Action Plan to Reduce Vehicle Emissions Jump to: navigation, search Name Vietnam-Integrated Action Plan to Reduce Vehicle Emissions Agency/Company /Organization Asian Development Bank Focus Area Transportation Topics Implementation, Policies/deployment programs, Background analysis Resource Type Guide/manual Website http://www.adb.org/documents/o Program Start 2002 Country Vietnam UN Region South-Eastern Asia References Vietnam-Integrated Action Plan to Reduce Vehicle Emissions[1] Background "A major goal of this strategy is to reduce mobile sources of air pollution in Viet Nam's largest cities. According to this strategy, industry, business units, management agencies and the transport sector must carefully control pollutant emissions such as carbon monoxide (CO), carbon dioxide

435

2008 CHP Baseline Assessment and Action Plan for the California Market  

Energy.gov (U.S. Department of Energy (DOE))

Report providing an updated baseline assessment and action plan for combined heat and power (CHP) in California and to identify the hurdles that prevent the expanded use of CHP system

436

Low-Temperature, Coproduced, and Geopressured Geothermal Technologies Strategic Action Plan, September 2010  

Energy.gov (U.S. Department of Energy (DOE))

This action plan presents an agenda for GTPs Low-Temperature and Coproduced Subprogram to efficiently and effectively leverage its resources in support of the geothermal communitys goals and priorities.

437

Technology Survey to Support Revision to the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit at the U.S. Department of Energys Hanford Site  

SciTech Connect

A survey of technologies was conducted to provide information for a Data Quality Objectives process being conducted to support revision of the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit. The technology survey considered remediation and characterization technologies. This effort was conducted to address, in part, comments on the previous version of the Remedial Investigation/Feasibility Study Work Plan for the 200-SW-2 Operable Unit as documented in 200SW1 and 200SW2 Collaborative Workshops?Agreement, Completion Matrix, and Supporting Documentation. By providing a thorough survey of remediation and characterization options, this report is intended to enable the subsequent data quality objectives and work plan revision processes to consider the full range of potential alternatives for planning of the Remedial Investigation/Feasibility Study activities.

Truex, Michael J.; Johnson, Christian D.; Nimmons, Michael J.

2007-09-25T23:59:59.000Z

438

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 408: Bomblet Target Area Tonopah Test Range (TTR), Nevada, Revision 1  

SciTech Connect

This Streamlined Approach for Environmental Restoration Plan addresses the actions needed to achieve closure of Corrective Action Unit (CAU) 408, Bomblet Target Area (TTR). Corrective Action Unit 408 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order. Corrective Action Unit 408 comprises Corrective Action Site TA-55-002-TAB2, Bomblet Target Areas. Clean closure of CAU 408 will be accomplished by removal of munitions and explosives of concern within seven target areas and potential disposal pits. The target areas were used to perform submunitions related tests for the U.S. Department of Energy (DOE). The scope of CAU 408 is limited to submunitions released from DOE activities. However, it is recognized that the presence of other types of unexploded ordnance and munitions may be present within the target areas due to the activities of other government organizations. The CAU 408 closure activities consist of: Clearing bomblet target areas within the study area. Identifying and remediating disposal pits. Collecting verification samples. Performing radiological screening of soil. Removing soil containing contaminants at concentrations above the action levels. Based on existing information, contaminants of potential concern at CAU 408 include unexploded submunitions, explosives, Resource Conservation Recovery Act metals, and depleted uranium. Contaminants are not expected to be present in the soil at concentrations above the action levels; however, this will be determined by radiological surveys and verification sample results.

Mark Krauss

2010-03-01T23:59:59.000Z

439

Corrective Action Investigation Plan for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada, Rev. 0  

SciTech Connect

This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Station (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

2003-05-08T23:59:59.000Z

440

Record of Technical Change for Corrective Action Plan for Corrective Action Unit 140: Waste Dumps, burn Pits, and Storage Area, Nevada Test Site, Nevada  

SciTech Connect

Record of Technical Change for Corrective Action Plan for Corrective Action Unit 140: Waste Dumps, Burn Pits, and Storage Area, Nevada Test Site, Nevada (DOE/NV--963-Rev 2, dated November 2004).

U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office; Bechtel Nevada

2005-01-05T23:59:59.000Z

Note: This page contains sample records for the topic "remedial action plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

U.S and Russia Develop Action Plan to Enhance Global and Bilateral Nuclear  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S and Russia Develop Action Plan to Enhance Global and Bilateral S and Russia Develop Action Plan to Enhance Global and Bilateral Nuclear Energy Cooperation U.S and Russia Develop Action Plan to Enhance Global and Bilateral Nuclear Energy Cooperation December 19, 2006 - 9:46am Addthis WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman and Russian Federal Atomic Energy Agency (Rosatom) Director Sergey V. Kiriyenko last week submitted to U.S. President George W. Bush and Russian President Vladimir Putin a joint work plan that will provide a framework for further bilateral cooperation in the development of nuclear energy technology and deployment. The plan was completed and signed by both parties the week of December 11, 2006, as part of an agreement that stemmed from the G8 Summit in St. Petersburg, Russia, in July of this year.

442

Unit environmental transport assessment of contaminants from Hanford`s past-practice waste sites. Hanford Remedial Action Environmental Impact Statement  

SciTech Connect

The US Department of Energy, Richland Operations Office (DOE-RL) contracted Pacific Northwest Laboratory (PNL) to provide support to Advanced Sciences, Incorporated (ASI) in implementing tile regional no-action risk assessment in the Hanford Remedial Action Environmental Impact Statement. Researchers at PNL were charged with developing unit concentrations for soil, groundwater, surface water, and air at multiple locations within an 80-km radius from the center of tile Hanford installation. Using the Multimedia Environmental Pollutant Assessment System (MEPAS), PNL simulated (1) a unit release of one ci for each radionuclide and one kg for each chemical from contaminated soils and ponded sites, (2) transport of the contaminants in and through various environmental media and (3) exposure/risk of four exposure scenarios, outlined by the Hanford Site Baseline Remedial Action Methodology. These four scenarios include residential, recreational, industrial, and agricultural exposures. Spacially and temporally distributed environmental concentrations based on unit releases of radionuclides and chemicals were supported to ASI in support of the HRA-EIS. Risk for the four exposure scenarios, based on unit environment concentrations in air, water, and soil. were also supplied to ASI. This report outlines the procedure that was used to implement the unit transport portion of the HRA-EIS baseline risk assessment. Deliverables include unit groundwater, surface water, air, and soil concentrations at multiple locations within an 80-km radius from the center of the Hanford installation.

Whelan, G.; Buck, J.W.; Castleton, K.J. [and others

1995-06-01T23:59:59.000Z

443

LEDSGP/Transportation Toolkit/Key Actions/Prioritize and Plan | Open Energy  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » LEDSGP/Transportation Toolkit/Key Actions/Prioritize and Plan < LEDSGP‎ | Transportation Toolkit‎ | Key Actions(Redirected from Transportation Toolkit/Key Actions/Prioritize and Plan) Jump to: navigation, search LEDSGP Logo.png Transportation Toolkit Home Tools Training Contacts Key Actions for Low-Emission Development in Transportation Although no single approach or fixed process exists for low-emission development strategies (LEDS), the following key actions are necessary steps for implementing LEDS in the transportation sector. Undertaking these actions requires flexibility to adapt to dynamic societal conditions in a

444

National climate change action plans: Interim report for developing and transition countries  

SciTech Connect

Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date with the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.

Benioff, R.; Ness, E.; Hirst, J. [eds.

1997-10-01T23:59:59.000Z

445

Emergency Action Plan For incidents involving hazardous materials, fires, explosions, or natural gas  

E-Print Network (OSTI)

-492-6025. For Non-Emergency Fire and Natural Gas Questions call the CU Fire Marshall @ 303-492-4042. AdditionalEmergency Action Plan For incidents involving hazardous materials, fires, explosions, or natural gas leaks, the following actions should be taken: 1) Life Safety First 2) Evacuate Immediate Area 3

Mojzsis, Stephen J.

446

FTCP FY09 Operational Plan GOAL 3 Objectives and Actions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Objective 1, Action 3: 2/5/09 Objective 1, Action 3: 2/5/09 Objective 1: Define and describe the key steps an individual should take following initial TQP qualification to achieve status as a DOE-recognized expert. (Dave Chaney) Action 3: Draft methods of potential designation/institutionalization of "Recognized" Experts Methods of potential designation/institutionalization of DOE Recognized Experts would follow from Qualification methods listed in Objective 1, Action 2 (Draft Attributes, Responsibilities and Qualification methods for current DOE/ NNSA Experts: January 23, 2009): "Qualification" methods include: 1) Oral Boards of technical peers, supervisors or approving officials, understanding that experts may have no technical peers; 2) Written exams combined with demonstrated successful application of the

447

Overview of Green and Sustainable Remediation for Soil and Groundwater Remediation - 12545  

SciTech Connect

Making remediation efforts more 'sustainable' or 'green' is a topic of great interest in the remediation community. It has been spurred on by Executive Orders from the White House, as well as Department of Energy (DOE) sustainability plans. In private industry, it is motivated by corporate sustainability goals and corporate social responsibility. It has spawned new organizations, areas of discussion, tools and practices, and guidance documents around sustainable remediation or green remediation. Green remediation can be thought of as a subset of sustainable remediation and is mostly focused on reducing the environmental footprint of cleanup efforts. Sustainable remediation includes both social and economic considerations, in addition to environmental. Application of both green and sustainable remediation (GSR) may involve two primary activities. The first is to develop technologies and alternatives that are greener or more sustainable. This can also include making existing remediation approaches greener or more sustainable. The second is to include GSR criteria in the evaluation of remediation alternatives and strategies. In other words, to include these GSR criteria in the evaluation of alternatives in a feasibility study. In some cases, regulatory frameworks allow the flexibility to include GSR criteria into the evaluation process (e.g., state cleanup programs). In other cases, regulations allow less flexibility to include the evaluation of GSR criteria (e.g., Comprehensive Environmental Response Compensation, and Liability Act (CERCLA)). New regulatory guidance and tools will be required to include these criteria in typical feasibility studies. GSR provides a number of challenges for remediation professionals performing soil and groundwater remediation projects. Probably the most significant is just trying to stay on top of the ever changing landscape of products, tools, and guidance documents coming out of various groups, the US EPA, and states. However, this process also provides new opportunities to think differently and look at the bigger picture of the overall benefit we are providing with our remediation projects. The opportunities from the move towards GSR are very real. They will help us make remedial actions truly more beneficial to the environment and to society. They will also allow (or force) remediation practitioners to think outside of the usual realm of approaches to find newer and more beneficial technologies. (authors)

Simpkin, Thomas J. [CH2M HILL, Denver, Colorado (United States); Favara, Paul [CH2M HILL, Gainesville, Florida (United States)

2012-07-01T23:59:59.000Z

448

Remedial investigation sampling and analysis plan for J-Field, Aberdeen Proving Ground, Maryland. Volume 1: Field Sampling Plan  

SciTech Connect

The Environmental Management Division (EMD) of Aberdeen Proving Ground (APG), Maryland, is conducting a remedial investigation and feasibility study (RI/FS) of the J-Field area at APG pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. J-Field is within the Edgewood Area of APG in Harford County, Maryland (Figure 1. 1). Since World War II activities in the Edgewood Area have included the development, manufacture, testing, and destruction of chemical agents and munitions. These materials were destroyed at J-Field by open burning and open detonation (OB/OD). Considerable archival information about J-Field exists as a result of efforts by APG staff to characterize the hazards associated with the site. Contamination of J-Field was first detected during an environmental survey of the Edgewood Area conducted in 1977 and 1978 by the US Army Toxic and Hazardous Materials Agency (USATHAMA) (predecessor to the US Army Environmental Center [AEC]). As part of a subsequent USATHAMA -environmental survey, 11 wells were installed and sampled at J-Field. Contamination at J-Field was also detected during a munitions disposal survey conducted by Princeton Aqua Science in 1983. The Princeton Aqua Science investigation involved the installation and sampling of nine wells and the collection and analysis of surficial and deep composite soil samples. In 1986, a Resource Conservation and Recovery Act (RCRA) permit (MD3-21-002-1355) requiring a basewide RCRA Facility Assessment (RFA) and a hydrogeologic assessment of J-Field was issued by the US Environmental Protection Agency (EPA). In 1987, the US Geological Survey (USGS) began a two-phased hydrogeologic assessment in data were collected to model, groundwater flow at J-Field. Soil gas investigations were conducted, several well clusters were installed, a groundwater flow model was developed, and groundwater and surface water monitoring programs were established that continue today.

Benioff, P.; Biang, R.; Dolak, D.; Dunn, C.; Martino, L.; Patton, T.; Wang, Y.; Yuen, C.

1995-03-01T23:59:59.000Z

449

Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 135, Area 25 Underground Storage Tanks (USTs), which is located on the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada.

U.S. Department of Energy, Nevada Operations Office

1999-05-05T23:59:59.000Z

450

Corrective Action Investigation Plan for Corrective Action Unit 240: Area 25 Vehicle Washdown Nevada Test Site, Nevada  

SciTech Connect

This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 240, Area 25 Vehicle Washdown, which is located on the Nevada Test Site (NTS).

DOE/NV

1999-01-25T23:59:59.000Z

451

Kenya-Action Plan for National Climate Change Response Strategy | Open  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Kenya-Action Plan for National Climate Change Response Strategy Jump to: navigation, search Name CDKN-Kenya-Action Plan for National Climate Change Response Strategy Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development Partner Ministry of Environment and Mineral Resources on behalf of the National CC Task Force, HTSPE, IDLA, LTS International/ ACCLIMATISE, IISD, Adam Smith International +subcontractors Sector Climate, Energy, Land Topics Background analysis, Low emission development planning, Market analysis, Pathways analysis Website http://cdkn.org/2011/04/an-act Program Start 2010 Program End 2012 Country Kenya

452

Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4  

SciTech Connect

This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

A. M. Tyson

2006-08-01T23:59:59.000Z

453

Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan  

SciTech Connect

This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describ