Sample records for reliable short-term operation

  1. Short-term and long-term reliability studies in the deregulated power systems

    E-Print Network [OSTI]

    Li, Yishan

    2006-04-12T23:59:59.000Z

    for the new structure to maintain system reliability. Power system reliability is comprised of two basic components, adequacy and security. In terms of the time frame, power system reliability can mean short-term reliability or long-term reliability. Short...

  2. Measuring Short-term Air Conditioner Demand Reductions for Operations and Settlement

    E-Print Network [OSTI]

    Bode, Josh

    2013-01-01T23:59:59.000Z

    Measuring Short-term Air Conditioner Demand Reductions forMeasuring Short-term Air Conditioner Demand Reductions forpilots have shown that air conditioner (AC) electric loads

  3. Enhanced Short-Term Wind Power Forecasting and Value to Grid Operations: Preprint

    SciTech Connect (OSTI)

    Orwig, K.; Clark, C.; Cline, J.; Benjamin, S.; Wilczak, J.; Marquis, M.; Finley, C.; Stern, A.; Freedman, J.

    2012-09-01T23:59:59.000Z

    The current state of the art of wind power forecasting in the 0- to 6-hour time frame has levels of uncertainty that are adding increased costs and risk on the U.S. electrical grid. It is widely recognized within the electrical grid community that improvements to these forecasts could greatly reduce the costs and risks associated with integrating higher penetrations of wind energy. The U.S. Department of Energy has sponsored a research campaign in partnership with the National Oceanic and Atmospheric Administration (NOAA) and private industry to foster improvements in wind power forecasting. The research campaign involves a three-pronged approach: 1) a 1-year field measurement campaign within two regions; 2) enhancement of NOAA's experimental 3-km High-Resolution Rapid Refresh (HRRR) model by assimilating the data from the field campaign; and 3) evaluation of the economic and reliability benefits of improved forecasts to grid operators. This paper and presentation provides an overview of the regions selected, instrumentation deployed, data quality and control, assimilation of data into HRRR, and preliminary results of HRRR performance analysis.

  4. Short-Term Energy Outlook

    U.S. Energy Information Administration (EIA) Indexed Site

    Chart Gallery for April 2015 Short-Term Energy Outlook U.S. Energy Information Administration Independent Statistics & Analysis 0 20 40 60 80 100 120 140 160 180 200 220 Jan 2014...

  5. Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    day Forecast -1.0 2012 2013 2014 OPEC countries North America Russia and Caspian Sea Latin America North Sea Other Non-OPEC Source: Short-Term Energy Outlook, November 2013 -1 0...

  6. Distributed Generation Operational Reliability and Availability...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reliability and Availability Database, Final Report, January 2004 Distributed Generation Operational Reliability and Availability Database, Final Report, January 2004 This final...

  7. Reliability Assessment Incorporating Operational Considerations and Economic

    E-Print Network [OSTI]

    PSERC Reliability Assessment Incorporating Operational Considerations and Economic Aspects Engineering Research Center Reliability Assessment Incorporating Operational Considerations and Economic and Economic Aspects for Large Interconnected Grids." We express our appreciation for the support provided

  8. Ramp Forecasting Performance from Improved Short-Term Wind Power Forecasting: Preprint

    SciTech Connect (OSTI)

    Zhang, J.; Florita, A.; Hodge, B. M.; Freedman, J.

    2014-05-01T23:59:59.000Z

    The variable and uncertain nature of wind generation presents a new concern to power system operators. One of the biggest concerns associated with integrating a large amount of wind power into the grid is the ability to handle large ramps in wind power output. Large ramps can significantly influence system economics and reliability, on which power system operators place primary emphasis. The Wind Forecasting Improvement Project (WFIP) was performed to improve wind power forecasts and determine the value of these improvements to grid operators. This paper evaluates the performance of improved short-term wind power ramp forecasting. The study is performed for the Electric Reliability Council of Texas (ERCOT) by comparing the experimental WFIP forecast to the current short-term wind power forecast (STWPF). Four types of significant wind power ramps are employed in the study; these are based on the power change magnitude, direction, and duration. The swinging door algorithm is adopted to extract ramp events from actual and forecasted wind power time series. The results show that the experimental short-term wind power forecasts improve the accuracy of the wind power ramp forecasting, especially during the summer.

  9. Short-Term Energy Outlook September 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    day Forecast -0.9 2012 2013 2014 OPEC countries North America Russia and Caspian Sea Latin America North Sea Other Non-OPEC Source: Short-Term Energy Outlook, September 2013 -1...

  10. Economic Evaluation of Short-Term Wind Power Forecasts in ERCOT: Preliminary Results; Preprint

    SciTech Connect (OSTI)

    Orwig, K.; Hodge, B. M.; Brinkman, G.; Ela, E.; Milligan, M.; Banunarayanan, V.; Nasir, S.; Freedman, J.

    2012-09-01T23:59:59.000Z

    Historically, a number of wind energy integration studies have investigated the value of using day-ahead wind power forecasts for grid operational decisions. These studies have shown that there could be large cost savings gained by grid operators implementing the forecasts in their system operations. To date, none of these studies have investigated the value of shorter-term (0 to 6-hour-ahead) wind power forecasts. In 2010, the Department of Energy and National Oceanic and Atmospheric Administration partnered to fund improvements in short-term wind forecasts and to determine the economic value of these improvements to grid operators, hereafter referred to as the Wind Forecasting Improvement Project (WFIP). In this work, we discuss the preliminary results of the economic benefit analysis portion of the WFIP for the Electric Reliability Council of Texas. The improvements seen in the wind forecasts are examined, then the economic results of a production cost model simulation are analyzed.

  11. Electricity storage for short term power system service (Smart...

    Open Energy Info (EERE)

    storage for short term power system service (Smart Grid Project) Jump to: navigation, search Project Name Electricity storage for short term power system service Country Denmark...

  12. Short-Term Energy Outlook- May 2003

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSettingUncertainties in the3 1 Short-Term

  13. Short-term energy outlook, January 1999

    SciTech Connect (OSTI)

    NONE

    1999-01-01T23:59:59.000Z

    The Energy Information Administration (EIA) prepares the Short-Term Energy Outlook (energy supply, demand, and price projections) monthly. The forecast period for this issue of the Outlook extends from January 1999 through December 2000. Data values for the fourth quarter 1998, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the January 1999 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the STIFS model. 28 figs., 19 tabs.

  14. Short-term energy outlook, July 1998

    SciTech Connect (OSTI)

    NONE

    1998-07-01T23:59:59.000Z

    The Energy Information Administration (EIA) prepares The Short-Term Energy Outlook (energy supply, demand, and price projections) monthly for distribution on the internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. In addition, printed versions of the report are available to subscribers in January, April, July and October. The forecast period for this issue of the Outlook extends from July 1998 through December 1999. Values for second quarter of 1998 data, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the July 1998 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. 28 figs., 19 tabs.

  15. Distributed Generation Operational Reliability, Executive Summary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2004 This report summarizes the results of the project, "Distributed Generation Market Transformation Tools: Distributed Generation Reliability and Availability Database,"...

  16. Short-term energy outlook quarterly projections. Third quarter 1997

    SciTech Connect (OSTI)

    NONE

    1997-07-01T23:59:59.000Z

    This document presents the 1997 third quarter short term energy projections. Information is presented for fossil fuels and renewable energy.

  17. The Wind Forecast Improvement Project (WFIP): A Public/Private Partnership for Improving Short Term Wind Energy Forecasts and Quantifying the Benefits of Utility Operations – the Southern Study Area

    SciTech Connect (OSTI)

    Freedman, Jeffrey M.; Manobianco, John; Schroeder, John; Ancell, Brian; Brewster, Keith; Basu, Sukanta; Banunarayanan, Venkat; Hodge, Bri-Mathias; Flores, Isabel

    2014-04-30T23:59:59.000Z

    This Final Report presents a comprehensive description, findings, and conclusions for the Wind Forecast Improvement Project (WFIP)--Southern Study Area (SSA) work led by AWS Truepower (AWST). This multi-year effort, sponsored by the Department of Energy (DOE) and National Oceanographic and Atmospheric Administration (NOAA), focused on improving short-term (15-minute – 6 hour) wind power production forecasts through the deployment of an enhanced observation network of surface and remote sensing instrumentation and the use of a state-of-the-art forecast modeling system. Key findings from the SSA modeling and forecast effort include: 1. The AWST WFIP modeling system produced an overall 10 – 20% improvement in wind power production forecasts over the existing Baseline system, especially during the first three forecast hours; 2. Improvements in ramp forecast skill, particularly for larger up and down ramps; 3. The AWST WFIP data denial experiments showed mixed results in the forecasts incorporating the experimental network instrumentation; however, ramp forecasts showed significant benefit from the additional observations, indicating that the enhanced observations were key to the model systems’ ability to capture phenomena responsible for producing large short-term excursions in power production; 4. The OU CAPS ARPS simulations showed that the additional WFIP instrument data had a small impact on their 3-km forecasts that lasted for the first 5-6 hours, and increasing the vertical model resolution in the boundary layer had a greater impact, also in the first 5 hours; and 5. The TTU simulations were inconclusive as to which assimilation scheme (3DVAR versus EnKF) provided better forecasts, and the additional observations resulted in some improvement to the forecasts in the first 1 – 3 hours.

  18. Semester, Academic Year and Short Term SUNY Programs

    E-Print Network [OSTI]

    Suzuki, Masatsugu

    Semester, Academic Year and Short Term SUNY Programs: Asia #12;1 Table of Contents How to Use Year 10 Japan Short-term 12 Korea Semester & Academic Year 13 Korea Short-term 17 Programs in Other Contact Information 23 How to Use this Booklet This handout contains listings of all the programs offered

  19. Short-term energy outlook quarterly projections. First quarter 1994

    SciTech Connect (OSTI)

    Not Available

    1994-02-07T23:59:59.000Z

    The Energy Information Administration (EIA) prepares quarterly, short- term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets.

  20. ORIGINAL PAPER Introduction to the Special Issues: Short-term

    E-Print Network [OSTI]

    Olufsen, Mette Sofie

    in short-term cardiovascular­respiratory regulation, (ii) to develop mathematical models that can improve involved in short-term cardio- vascular­respiratory control include auto-regulation of vasculature, controlORIGINAL PAPER Introduction to the Special Issues: Short-term Cardiovascular­Respiratory Control

  1. Conditional Reliability Modeling of Short-term River Basin Management

    E-Print Network [OSTI]

    Salazar, A.; Wurbs, R. A.

    2003-01-01T23:59:59.000Z

    , which are highly dependent on known current conditions of reservoir storage. 8 WRAP MODEL: Limitations 0 100 200 300 400 Jan-34 Jan-37 Jan-40 Jan-43 Jan-46 Jan-49 Jan-52 Jan-55 Jan-58 Jan-61 Jan-64 Jan-67 Jan-70 Jan-73 Jan-76 Jan-79 Jan-82 Jan-85 Jan... Q1 (Jan 1939) Q2 (Feb 1939) Q3 (Mar 1939) ? ? Qm (Dec 1939) Output 1 Simulation 2 Q1 (Jan 1940) Q2 (Feb 1940) Q3 (Mar 1940) ? ? Qm (Dec 1940) Output 2 Simulation n Q1 (Jan 2002) Q2 (Feb 2002) Q3 (Mar 2002) ? ? Qm (Dec 2002) Output n INITIAL CONDITION...

  2. Sandia National Laboratories: PV Reliability Operations Maintenance...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Maintenance database Sandia-Electric Power Research Institute Partnership Publishes Photovoltaic Reliability Report On January 21, 2014, in Energy, Facilities, Grid...

  3. Short-term energy outlook, April 1999

    SciTech Connect (OSTI)

    NONE

    1999-04-01T23:59:59.000Z

    The forecast period for this issue of the Outlook extends from April 1999 through December 2000. Data values for the first quarter 1999, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the April 1999 version of the Short-Term Integrated forecasting system (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the STIFS model. 25 figs., 19 tabs.

  4. Short-term energy outlook. Quarterly projections, Third quarter 1994

    SciTech Connect (OSTI)

    Not Available

    1994-08-02T23:59:59.000Z

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202). The feature article for this issue is Demand, Supply and Price Outlook for Reformulated Gasoline, 1995.

  5. SUNY Programs: Semester, Academic Year and Short Term

    E-Print Network [OSTI]

    Suzuki, Masatsugu

    SUNY Programs: Italy Semester, Academic Year and Short Term #12;1 Table of Contents How to Use This Booklet 1 A Brief Overview 2 Semester and Academic Year Programs 3 Short Term Programs 8 Contact of programs offered in Italy by SUNY campuses. These listings provide a summary about the basic

  6. SUNY Programs: Semester, Academic Year and Short Term

    E-Print Network [OSTI]

    Suzuki, Masatsugu

    SUNY Programs: France Semester, Academic Year and Short Term #12;1 Table of Contents How to Use This Booklet 1 A Brief Overview 2 Semester and Academic Year Programs 3 Short Term Programs 6 SUNY Programs in Canada and other Francophone Locations 9 Recommended non-SUNY Program 11 Contact Information for all SUNY

  7. Short-term energy outlook, annual supplement 1994

    SciTech Connect (OSTI)

    Not Available

    1994-08-01T23:59:59.000Z

    The Short-Term Energy Outlook Annual Supplement (Supplement) is published once a year as a complement to the Short-Term Energy Outlook (Outlook), Quarterly Projections. The purpose of the Supplement is to review the accuracy of the forecasts published in the Outlook, make comparisons with other independent energy forecasts, and examine current energy topics that affect the forecasts.

  8. Short-term energy outlook annual supplement, 1993

    SciTech Connect (OSTI)

    NONE

    1993-08-06T23:59:59.000Z

    The Short-Term Energy Outlook Annual Supplement (supplement) is published once a year as a complement to the Short-Term Energy Outlook (Outlook), Quarterly Projections. The purpose of the Supplement is to review the accuracy of the forecasts published in the Outlook, make comparisons with other independent energy forecasts, and examine current energy topics that affect the forecasts.

  9. ORIGINAL CONTRIBUTION Ozone and Short-term Mortality

    E-Print Network [OSTI]

    Dominici, Francesca

    ORIGINAL CONTRIBUTION Ozone and Short-term Mortality in 95 US Urban Communities, 1987-2000 MichelleD E XPOSURE TO TROPOSPHERIC OZONE is widespread in the United States,1,2 occurring also outside southernCalifornia,whereozone formation was first recognized.3 Short- term exposure to ozone has been

  10. Short-term energy outlook. Quarterly projections, Third quarter 1995

    SciTech Connect (OSTI)

    NONE

    1995-08-02T23:59:59.000Z

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent projections with those of other forecasting services, and discusses current topics related to the short-term energy markets. The forecast period for this issue of the Outlook extends from the third quarter of 1995 through the fourth quarter of 1996. Values for the second quarter of 1995, however, are preliminary EIA estimates.

  11. The Wind Forecast Improvement Project (WFIP): A Public/Private Partnership for Improving Short Term Wind Energy Forecasts and Quantifying the Benefits of Utility Operations – the Northern Study Area.

    SciTech Connect (OSTI)

    Finley, Cathy [WindLogics

    2014-04-30T23:59:59.000Z

    This report contains the results from research aimed at improving short-range (0-6 hour) hub-height wind forecasts in the NOAA weather forecast models through additional data assimilation and model physics improvements for use in wind energy forecasting. Additional meteorological observing platforms including wind profilers, sodars, and surface stations were deployed for this study by NOAA and DOE, and additional meteorological data at or near wind turbine hub height were provided by South Dakota State University and WindLogics/NextEra Energy Resources over a large geographical area in the U.S. Northern Plains for assimilation into NOAA research weather forecast models. The resulting improvements in wind energy forecasts based on the research weather forecast models (with the additional data assimilation and model physics improvements) were examined in many different ways and compared with wind energy forecasts based on the current operational weather forecast models to quantify the forecast improvements important to power grid system operators and wind plant owners/operators participating in energy markets. Two operational weather forecast models (OP_RUC, OP_RAP) and two research weather forecast models (ESRL_RAP, HRRR) were used as the base wind forecasts for generating several different wind power forecasts for the NextEra Energy wind plants in the study area. Power forecasts were generated from the wind forecasts in a variety of ways, from very simple to quite sophisticated, as they might be used by a wide range of both general users and commercial wind energy forecast vendors. The error characteristics of each of these types of forecasts were examined and quantified using bulk error statistics for both the local wind plant and the system aggregate forecasts. The wind power forecast accuracy was also evaluated separately for high-impact wind energy ramp events. The overall bulk error statistics calculated over the first six hours of the forecasts at both the individual wind plant and at the system-wide aggregate level over the one year study period showed that the research weather model-based power forecasts (all types) had lower overall error rates than the current operational weather model-based power forecasts, both at the individual wind plant level and at the system aggregate level. The bulk error statistics of the various model-based power forecasts were also calculated by season and model runtime/forecast hour as power system operations are more sensitive to wind energy forecast errors during certain times of year and certain times of day. The results showed that there were significant differences in seasonal forecast errors between the various model-based power forecasts. The results from the analysis of the various wind power forecast errors by model runtime and forecast hour showed that the forecast errors were largest during the times of day that have increased significance to power system operators (the overnight hours and the morning/evening boundary layer transition periods), but the research weather model-based power forecasts showed improvement over the operational weather model-based power forecasts at these times. A comprehensive analysis of wind energy forecast errors for the various model-based power forecasts was presented for a suite of wind energy ramp definitions. The results compiled over the year-long study period showed that the power forecasts based on the research models (ESRL_RAP, HRRR) more accurately predict wind energy ramp events than the current operational forecast models, both at the system aggregate level and at the local wind plant level. At the system level, the ESRL_RAP-based forecasts most accurately predict both the total number of ramp events and the occurrence of the events themselves, but the HRRR-based forecasts more accurately predict the ramp rate. At the individual site level, the HRRR-based forecasts most accurately predicted the actual ramp occurrence, the total number of ramps and the ramp rates (40-60% improvement in ramp rates over the coarser resolution forecast

  12. Short-term CO? abatement in the European power sector

    E-Print Network [OSTI]

    Delarue, Erik D.

    2008-01-01T23:59:59.000Z

    This paper focuses on the possibilities for short term abatement in response to a CO2 price through fuel switching in the European power sector. The model E-Simulate is used to simulate the electricity generation in Europe ...

  13. A model for short term electric load forecasting

    E-Print Network [OSTI]

    Tigue, John Robert

    1975-01-01T23:59:59.000Z

    A MODEL FOR SHORT TERM ELECTRIC LOAD FORECASTING A Thesis by JOHN ROBERT TIGUE, III Submitted to the Graduate College of Texas ASM University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE May 1975 Major... Subject: Electrical Engineering A MODEL FOR SHORT TERM ELECTRIC LOAD FORECASTING A Thesis by JOHN ROBERT TIGUE& III Approved as to style and content by: (Chairman of Committee) (Head Depart t) (Member) ;(Me r (Member) (Member) May 1975 ABSTRACT...

  14. Short-Term Operation Scheduling in Renewable-Powered Microgrids

    E-Print Network [OSTI]

    Bornemann, Jens

    existing algorithms; 2) an energy storage system (ESS) with suitable capacity contributes to the self. Cold start-up cost of a unit. Dual function. Forecasted demand in time interval . Emission function of a unit. CDF of wind power forecast error. Fuel cost function of a unit. Hot start-up cost of a unit. L

  15. Short-term energy outlook: Quarterly projections. Second quarter 1995

    SciTech Connect (OSTI)

    NONE

    1995-05-02T23:59:59.000Z

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent projections with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the second quarter of 1995 through the fourth quarter of 1996. Values for the first quarter of 1995, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the second quarter 1995 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service.

  16. Short-term measurements for the determination of envelope retrofit performance

    SciTech Connect (OSTI)

    Subbarao, K.; Mort, D.; Burch, J.

    1985-06-01T23:59:59.000Z

    Short-term monitoring for estimating thermal parameters of a building, along with an analytical technique to (1) determine the long-term performance and (2) calculate the parameters from a building description, has many valuable applications, which include energy ratings, diagnostics, and retrofit analysis. In this paper we address issues relating to reducing uncertainties in estimating thermal parameters with emphasis on retrofit applications. In general, it is necessary to impose a known heat flow with a suitable profile to reliably estimate the parameters. This is demonstrated with test cell measurements taken before and after changes were made to the test cell. The eventual goal of this project is to develop a practical methodology to determine long-term retrofit performance from short-term tests.

  17. Short-term energy outlook. Volume 2. Methodology

    SciTech Connect (OSTI)

    Not Available

    1982-05-01T23:59:59.000Z

    This volume updates models and forecasting methodologies used and presents information on new developments since November 1981. Chapter discusses the changes in forecasting methodology for motor gasoline demand, electricity sales, coking coal, and other petroleum products. Coefficient estimates, summary statistics, and data sources for many of the short-term energy models are provided. Chapter 3 evaluates previous short-term forecasts for the macroeconomic variables, total energy, petroleum supply and demand, coal consumption, natural gas, and electricity fuel shares. Chapter 4 reviews the relationship of total US energy consumption to economic activity between 1960 and 1981.

  18. SULFURIC ACID REMOVAL PROCESS EVALUATION: SHORT-TERM RESULTS

    SciTech Connect (OSTI)

    Gary M. Blythe; Richard McMillan

    2002-03-04T23:59:59.000Z

    The objective of this project is to demonstrate the use of alkaline reagents injected into the furnace of coal-fired boilers as a means of controlling sulfuric acid emissions. Sulfuric acid controls are becoming of increasing interest to utilities with coal-fired units for a number of reasons. Sulfuric acid is a Toxic Release Inventory species, a precursor to acid aerosol/condensable emissions, and can cause a variety of plant operation problems such as air heater plugging and fouling, back-end corrosion, and plume opacity. These issues will likely be exacerbated with the retrofit of SCR for NOX control on some coal-fired plants, as SCR catalysts are known to further oxidize a portion of the flue gas SO{sub 2} to SO{sub 3}. The project is testing the effectiveness of furnace injection of four different calcium- and/or magnesium-based alkaline sorbents on full-scale utility boilers. These reagents have been tested during four one- to two-week tests conducted on two FirstEnergy Bruce Mansfield Plant units. One of the sorbents tested was a magnesium hydroxide slurry produced from a wet flue gas desulfurization system waste stream, from a system that employs a Thiosorbic{reg_sign} Lime scrubbing process. The other three sorbents are available commercially and include dolomite, pressure-hydrated dolomitic lime, and commercial magnesium hydroxide. The dolomite reagent was injected as a dry powder through out-of-service burners, while the other three reagents were injected as slurries through air-atomizing nozzles into the front wall of upper furnace, either across from the nose of the furnace or across from the pendant superheater tubes. After completing the four one- to two-week tests, the most promising sorbents were selected for longer-term (approximately 25-day) full-scale tests. The longer-term tests are being conducted to confirm the effectiveness of the sorbents tested over extended operation and to determine balance-of-plant impacts. This reports presents the results of the short-term tests; the long-term test results will be reported in a later document. The short-term test results showed that three of the four reagents tested, dolomite powder, commercial magnesium hydroxide slurry, and byproduct magnesium hydroxide slurry, were able to achieve 90% or greater removal of sulfuric acid compared to baseline levels. The molar ratio of alkali to flue gas sulfuric acid content (under baseline conditions) required to achieve 90% sulfuric acid removal was lowest for the byproduct magnesium hydroxide slurry. However, this result may be confounded because this was the only one of the three slurries tested with injection near the top of the furnace across from the pendant superheater platens. Injection at the higher level was demonstrated to be advantageous for this reagent over injection lower in the furnace, where the other slurries were tested.

  19. SULFURIC ACID REMOVAL PROCESS EVALUATION: SHORT-TERM RESULTS

    SciTech Connect (OSTI)

    Gary M. Blythe; Richard McMillan

    2002-02-04T23:59:59.000Z

    The objective of this project is to demonstrate the use of alkaline reagents injected into the furnace of coal-fired boilers as a means of controlling sulfuric acid emissions. Sulfuric acid controls are becoming of increasing interest to utilities with coal-fired units for a number of reasons. Sulfuric acid is a Toxic Release Inventory species, a precursor to acid aerosol/condensable emissions, and can cause a variety of plant operation problems such as air heater plugging and fouling, back-end corrosion, and plume opacity. These issues will likely be exacerbated with the retrofit of SCR for NO{sub x} control on some coal-fired plants, as SCR catalysts are known to further oxidize a portion of the flue gas SO{sub 2} to SO{sub 3}. The project is testing the effectiveness of furnace injection of four different calcium- and/or magnesium-based alkaline sorbents on full-scale utility boilers. These reagents have been tested during four one- to two-week tests conducted on two First Energy Bruce Mansfield Plant units. One of the sorbents tested was a magnesium hydroxide slurry produced from a wet flue gas desulfurization system waste stream, from a system that employs a Thiosorbic{reg_sign} Lime scrubbing process. The other three sorbents are available commercially and include dolomite, pressure-hydrated dolomitic lime, and commercial magnesium hydroxide. The dolomite reagent was injected as a dry powder through out-of-service burners, while the other three reagents were injected as slurries through air-atomizing nozzles into the front wall of upper furnace, either across from the nose of the furnace or across from the pendant superheater tubes. After completing the four one- to two-week tests, the most promising sorbents were selected for longer-term (approximately 25-day) full-scale tests. The longer-term tests are being conducted to confirm the effectiveness of the sorbents tested over extended operation and to determine balance-of-plant impacts. This reports presents the results of the short-term tests; the long-term test results will be reported in a later document. The short-term test results showed that three of the four reagents tested, dolomite powder, commercial magnesium hydroxide slurry, and byproduct magnesium hydroxide slurry, were able to achieve 90% or greater removal of sulfuric acid compared to baseline levels. The molar ratio of alkali to flue gas sulfuric acid content (under baseline conditions) required to achieve 90% sulfuric acid removal was lowest for the byproduct magnesium hydroxide slurry. However, this result may be confounded because this was the only one of the three slurries tested with injection near the top of the furnace across from the pendant superheater platens. Injection at the higher level was demonstrated to be advantageous for this reagent over injection lower in the furnace, where the other slurries were tested.

  20. Achieving High Reliability Operations Through Multi-Program Integration

    SciTech Connect (OSTI)

    Holly M. Ashley; Ronald K. Farris; Robert E. Richards

    2009-04-01T23:59:59.000Z

    Over the last 20 years the Idaho National Laboratory (INL) has adopted a number of operations and safety-related programs which has each periodically taken its turn in the limelight. As new programs have come along there has been natural competition for resources, focus and commitment. In the last few years, the INL has made real progress in integrating all these programs and are starting to realize important synergies. Contributing to this integration are both collaborative individuals and an emerging shared vision and goal of the INL fully maturing in its high reliability operations. This goal is so powerful because the concept of high reliability operations (and the resulting organizations) is a masterful amalgam and orchestrator of the best of all the participating programs (i.e. conduct of operations, behavior based safety, human performance, voluntary protection, quality assurance, and integrated safety management). This paper is a brief recounting of the lessons learned, thus far, at the INL in bringing previously competing programs into harmony under the goal (umbrella) of seeking to perform regularly as a high reliability organization. In addition to a brief diagram-illustrated historical review, the authors will share the INL’s primary successes (things already effectively stopped or started) and the gaps yet to be bridged.

  1. Rapid Re-Housing and Short-Term Rental

    E-Print Network [OSTI]

    Snider, Barry B.

    Rapid Re-Housing and Short-Term Rental Vouchers for Homeless Families: Summary Report of a Pilot of numerous reports and publications, such as Bridges and Barriers to Housing for Chronically Homeless Street Dwellers; Accessing Housing: Exploring the Impact of Medical and Substance Abuse Services; The First Two

  2. Short term forecasting of solar radiation based on satellite data

    E-Print Network [OSTI]

    Heinemann, Detlev

    Short term forecasting of solar radiation based on satellite data Elke Lorenz, Annette Hammer University, D-26111 Oldenburg Forecasting of solar irradiance will become a major issue in the future integration of solar energy resources into existing energy supply structures. Fluctuations of solar irradiance

  3. Management and Conservation Short-Term Impacts of Wind Energy

    E-Print Network [OSTI]

    Beck, Jeffrey L.

    Management and Conservation Short-Term Impacts of Wind Energy Development on Greater Sage associated with wind energy development on greater sage-grouse populations. We hypothesized that greater sage-grouse nest, brood, and adult survival would decrease with increasing proximity to wind energy infrastructure

  4. Short-Term Energy Outlook: Quarterly projections. Fourth quarter 1993

    SciTech Connect (OSTI)

    Not Available

    1993-11-05T23:59:59.000Z

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the fourth quarter of 1993 through the fourth quarter of 1994. Values for the third quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications.

  5. Short-term energy outlook. Quarterly projections, second quarter 1996

    SciTech Connect (OSTI)

    NONE

    1996-04-01T23:59:59.000Z

    The Energy Information Administration prepares quarterly, short-term energy supply, demand, and price projections. The forecasts in this issue cover the second quarter of 1996 through the fourth quarter of 1997. Changes to macroeconomic measures by the Bureau of Economic Analysis have been incorporated into the STIFS model used.

  6. Short-term energy outlook quarterly projections: First quarter 1993

    SciTech Connect (OSTI)

    Not Available

    1993-02-03T23:59:59.000Z

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.). The forecast period for this issue of the Outlook extends from the first quarter of 1993 through the fourth quarter of 1994. Values for the fourth quarter of 1992, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding.

  7. Short-term energy outlook: Quarterly projections, Third quarter 1992

    SciTech Connect (OSTI)

    Not Available

    1992-08-01T23:59:59.000Z

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The principal users of the Outlook are managers and energy analysts in private industry and government. The forecast period for this issue of the Outlook extends from the third quarter of 1992 through the fourth quarter of 1993. Values for the second quarter of 1992, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding.

  8. Short-term energy outlook, Quarterly projections. Third quarter 1993

    SciTech Connect (OSTI)

    NONE

    1993-08-04T23:59:59.000Z

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the third quarter of 1993 through the fourth quarter of 1994. Values for the second quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding.

  9. Word learning, phonological short-term memory, phonotactic probability and

    E-Print Network [OSTI]

    Gupta, Prahlad

    for thinking about various types of studies of word learning. We then review a number of themes that in recent as a useful organizing scheme for thinking about various types of studies of word learning. In §2, we reviewWord learning, phonological short-term memory, phonotactic probability and long-term memory

  10. ANALYSIS OF SHORT-TERM SOLAR RADIATION DATA Gayathri Vijayakumar

    E-Print Network [OSTI]

    Wisconsin at Madison, University of

    ANALYSIS OF SHORT-TERM SOLAR RADIATION DATA Gayathri Vijayakumar Sanford A. Klein William A beckman@engr.wisc.edu ABSTRACT Solar radiation data are available for many locations on an hourly basis annual performance, although solar radiation can exhibit wide variations during an hour. Variations

  11. Future stand conditions: Short term: Many aspen whips will sprout

    E-Print Network [OSTI]

    Future stand conditions: Short term: Many aspen whips will sprout from the roots of cut trees. Pine, aspen, birch, and basswood. What's Going on Here? Active management is being used to fulfill trees (aspen and birch) Economic goals: Generate revenue to help maintain the forest, trails and other

  12. Short-Term Solar Energy Forecasting Using Wireless Sensor Networks

    E-Print Network [OSTI]

    Cerpa, Alberto E.

    Short-Term Solar Energy Forecasting Using Wireless Sensor Networks Stefan Achleitner, Tao Liu an advantage for output power prediction. Solar Energy Prediction System Our prediction model is based variability of more then 100 kW per minute. For practical usage of solar energy, predicting times of high

  13. SHORT-TERM GENERATION ASSET VALUATION: A REAL OPTIONS APPROACH

    E-Print Network [OSTI]

    Tseng, Chung-Li

    using real options to value power plants with unit commitment constraints over a short-term period. We forward-moving Monte Carlo simulation with backward-moving dynamic programming. We assume that the power significantly overvalue a power plant. With deregulation of the electricity industry a global trend, utilities

  14. RESEARCH ARTICLE Empirical assessment of short-term variability from

    E-Print Network [OSTI]

    -term variability; PV plant ramp rate; daily aggregate ramp rate; inverter shells *Correspondence Rob van HaarenRESEARCH ARTICLE Empirical assessment of short-term variability from utility-scale solar PV plants and the output from 390 inverters. We use a simple metric, "daily aggregate ramp rate" to quantify, categorize

  15. ASPECT OBJECTIVE SHORT TERM TARGET by 2015 (unless otherwise stated)

    E-Print Network [OSTI]

    Chittka, Lars

    the remainder. Completion of Waste Management Strategy by the end of 2012. Implementation of the short term actions of the WMS by 2015 and long term actions by 2020. Development of a Waste Management Strategy (WMS costs per student (FTE). Estates and Facilities and Sustainability Committee 3 Energy consumed and used

  16. SUNY Programs: Semester, Academic Year and Short Term

    E-Print Network [OSTI]

    Suzuki, Masatsugu

    SUNY Programs: Spain Semester, Academic Year and Short Term #12;1 Table of Contents How to Use of programs offered in Spain by SUNY campuses. These listings provide a summary about the characteristics by the SUNY campuses in Spain. In addition, there are some excellent programs in Spain outside the SUNY system

  17. analyzing short-term noise: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    122 Short term effects of moderate carbon prices on land use in the New Zealand emissions trading Environmental Sciences and Ecology Websites Summary: Short term effects of...

  18. ADVANCED COMPRESSOR ENGINE CONTROLS TO ENHANCE OPERATION, RELIABILITY AND INTEGRITY

    SciTech Connect (OSTI)

    Gary D. Bourn; Jess W. Gingrich; Jack A. Smith

    2004-03-01T23:59:59.000Z

    This document is the final report for the ''Advanced Compressor Engine Controls to Enhance Operation, Reliability, and Integrity'' project. SwRI conducted this project for DOE in conjunction with Cooper Compression, under DOE contract number DE-FC26-03NT41859. This report addresses an investigation of engine controls for integral compressor engines and the development of control strategies that implement closed-loop NOX emissions feedback.

  19. Short-term load forecasting using generalized regression and probabilistic neural networks in the electricity market

    SciTech Connect (OSTI)

    Tripathi, M.M.; Upadhyay, K.G.; Singh, S.N.

    2008-11-15T23:59:59.000Z

    For the economic and secure operation of power systems, a precise short-term load forecasting technique is essential. Modern load forecasting techniques - especially artificial neural network methods - are particularly attractive, as they have the ability to handle the non-linear relationships between load, weather temperature, and the factors affecting them directly. A test of two different ANN models on data from Australia's Victoria market is promising. (author)

  20. USING SEQUENCING TO IMPROVE OPERATIONAL EFFICIENCY AND RELIABILITY

    SciTech Connect (OSTI)

    D OTTAVIO,T.; NIEDZIELA, J.

    2007-10-15T23:59:59.000Z

    Operation of an accelerator requires the efficient and reproducible execution of many different types of procedures. Some procedures, like beam acceleration, magnet quench recovery, and species switching can be quite complex. To improve accelerator reliability and efficiency, automated execution of procedures is required. Creation of a single robust sequencing application permits the streamlining of this process and offers many benefits in sequence creation, editing, and control. In this paper, we present key features of a sequencer application commissioned at the Collider-Accelerator Department of Brookhaven National Laboratory during the 2007 run. Included is a categorization of the different types of sequences in use, a discussion of the features considered desirable in a good sequencer, and a description of the tools created to aid in sequence construction and diagnosis. Finally, highlights from our operational experience are presented, with emphasis on Operations control of the sequencer, and the alignment of sequence construction with existing operational paradigms.

  1. Short-term energy outlook. Quarterly projections, first quarter 1995

    SciTech Connect (OSTI)

    Not Available

    1995-02-01T23:59:59.000Z

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). The forecast period for this issue of the Outlook extends from the first quarter of 1995 through the fourth quarter of 1996. Values for the fourth quarter of 1994, however, are preliminary EIA estimates or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the first quarter 1995 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the Short-Term Integrated Forecasting System (STIFS). The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. The EIA model is available on computer tape from the National Technical Information Service.

  2. Short-term energy outlook: Quarterly projections, fourth quarter 1997

    SciTech Connect (OSTI)

    NONE

    1997-10-14T23:59:59.000Z

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for printed publication in January, April, July, and October in the Short-Term Energy Outlook. The details of these projections, as well as monthly updates on or about the 6th of each interim month, are available on the internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The forecast period for this issue of the Outlook extends from the fourth quarter of 1997 through the fourth quarter of 1998. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the fourth quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. 19 tabs.

  3. Reliability of Operation at SLAC in the LCLS Era

    SciTech Connect (OSTI)

    Wienands, U.; Allen, W.B.; Colocho, W.; Erickson, R.; Stanek, M.; /SLAC

    2009-06-19T23:59:59.000Z

    LCLS hardware availability has been above 90% for the first two commissioning runs of the accelerator. In this paper we compare the reliability data for LCLS (availability, MTBF and MTTR) to those of PEP-II, the e{sup +}e{sup -} collider operating previously at SLAC. It may be seen that the linac availability is not significantly different now than it was before, while the availability of the whole LCLS facility is significantly higher than that of the PEP-II facility as a whole (which was about 87%). Most of the improvement is in the MTTR. Ways to improve availability towards the goal of 95% are discussed.

  4. Short-term energy outlook: Quarterly projections, second quarter 1997

    SciTech Connect (OSTI)

    NONE

    1997-04-01T23:59:59.000Z

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for publication in January, April, July, and October in the Outlook. The forecast period for this issue of the Outlook extends from the second quarter of 1997 through the fourth quarter of 1998. Values for the first quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the second quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the Short-Term Integrated Forecasting System (STIFS). 34 figs., 19 tabs.

  5. Short-term energy outlook. Quarterly projections, first quarter 1996

    SciTech Connect (OSTI)

    NONE

    1996-02-01T23:59:59.000Z

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Outlook. The forecast period for this issue of the Outlook extends from the first quarter of 1996 through the fourth quarter of 1997. Values for the fourth quarter of 1995, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the first quarter 1996 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the Short-Term Integrated Forecasting System (STIFS). The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook.

  6. Short-term energy outlook, quarterly projections, second quarter 1998

    SciTech Connect (OSTI)

    NONE

    1998-04-01T23:59:59.000Z

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections. The details of these projections, as well as monthly updates, are available on the Internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The paper discusses outlook assumptions; US energy prices; world oil supply and the oil production cutback agreement of March 1998; international oil demand and supply; world oil stocks, capacity, and net trade; US oil demand and supply; US natural gas demand and supply; US coal demand and supply; US electricity demand and supply; US renewable energy demand; and US energy demand and supply sensitivities. 29 figs., 19 tabs.

  7. Energy Information Administration/Short-Term Energy Outlook - August 2005

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto17 3400, U.S.MajorMarkets EnergyConsumption5 1 Short-Term Energy

  8. Energy Information Administration/Short-Term Energy Outlook - February 2005

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto17 3400, U.S.MajorMarkets EnergyConsumption5 1 Short-Term

  9. Energy Information Administration/Short-Term Energy Outlook - January 2005

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto17 3400, U.S.MajorMarkets EnergyConsumption5 1 Short-TermJanuary

  10. Energy Information Administration/Short-Term Energy Outlook - June 2005

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto17 3400, U.S.MajorMarkets EnergyConsumption5 15 1 Short-Term

  11. Energy Information Administration/Short-Term Energy Outlook - May 2005

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto17 3400, U.S.MajorMarkets EnergyConsumption5 15 1 Short-Term5 1

  12. Energy Information Administration/Short-Term Energy Outlook - October 2005

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto17 3400, U.S.MajorMarkets EnergyConsumption5 15 1 Short-Term5 15 1

  13. Energy Information Administration/Short-Term Energy Outlook - September 2005

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto17 3400, U.S.MajorMarkets EnergyConsumption5 15 1 Short-Term5 15

  14. Short-Term Energy and Winter Fuels Outlook October 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSettingUncertainties in the3 1 Short-Term3 1

  15. SHORT-TERM SOLAR FLARE PREDICTION USING MULTIRESOLUTION PREDICTORS

    SciTech Connect (OSTI)

    Yu Daren; Huang Xin; Hu Qinghua; Zhou Rui [Harbin Institute of Technology, No. 92 West Da-Zhi Street, Harbin, Heilongjiang Province (China); Wang Huaning [National Astronomical Observatories, 20A Datun Road, Chaoyang District, Beijing (China); Cui Yanmei, E-mail: huangxinhit@yahoo.com.c [Center for Space Science and Applied Research, No. 1 Nanertiao, Zhongguancun, Haidian District, Beijing (China)

    2010-01-20T23:59:59.000Z

    Multiresolution predictors of solar flares are constructed by a wavelet transform and sequential feature extraction method. Three predictors-the maximum horizontal gradient, the length of neutral line, and the number of singular points-are extracted from Solar and Heliospheric Observatory/Michelson Doppler Imager longitudinal magnetograms. A maximal overlap discrete wavelet transform is used to decompose the sequence of predictors into four frequency bands. In each band, four sequential features-the maximum, the mean, the standard deviation, and the root mean square-are extracted. The multiresolution predictors in the low-frequency band reflect trends in the evolution of newly emerging fluxes. The multiresolution predictors in the high-frequency band reflect the changing rates in emerging flux regions. The variation of emerging fluxes is decoupled by wavelet transform in different frequency bands. The information amount of these multiresolution predictors is evaluated by the information gain ratio. It is found that the multiresolution predictors in the lowest and highest frequency bands contain the most information. Based on these predictors, a C4.5 decision tree algorithm is used to build the short-term solar flare prediction model. It is found that the performance of the short-term solar flare prediction model based on the multiresolution predictors is greatly improved.

  16. Short-term energy outlook. Quarterly projections, third quarter 1996

    SciTech Connect (OSTI)

    NONE

    1996-07-01T23:59:59.000Z

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in January, April, July, and October in the Outlook. The forecast period for this issue of the Outlook extends from the third quarter of 1996 through the fourth quarter of 1997. Values for the second quarter of 1996, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled in the third quarter 1996 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service.

  17. Short-Term Test Results: Multifamily Home Energy Efficiency Retrofit

    SciTech Connect (OSTI)

    Lyons, J.

    2013-01-01T23:59:59.000Z

    Multifamily deep energy retrofits (DERs) represent great potential for energy savings, while also providing valuable insights on research-generated efficiency measures, cost-effectiveness metrics, and risk factor strategies for the multifamily housing industry. The Bay Ridge project is comprised of a base scope retrofit with a goal of achieving 30% savings (relative to pre-retrofit), and a DER scope with a goal of 50% savings (relative to pre-retrofit). The base scope has been applied to the entire complex, except for one 12-unit building which underwent the DER scope. Findings from the implementation, commissioning, and short-term testing at Bay Ridge include air infiltration reductions of greater than 60% in the DER building; a hybrid heat pump system with a Savings to Investment Ratio (SIR) > 1 (relative to a high efficiency furnace) which also provides the resident with added incentive for energy savings; and duct leakage reductions of > 60% using an aerosolized duct sealing approach. Despite being a moderate rehab instead of a gut rehab, the Bay Ridge DER is currently projected to achieve energy savings ? 50% compared to pre-retrofit, and the short-term testing supports this estimate.

  18. Short-term energy outlook, Annual supplement 1995

    SciTech Connect (OSTI)

    NONE

    1995-07-25T23:59:59.000Z

    This supplement is published once a year as a complement to the Short- Term Energy Outlook, Quarterly Projections. The purpose of the Supplement is to review the accuracy of the forecasts published in the Outlook, make comparisons with other independent energy forecasts, and examine current energy topics that affect the forecasts. Chap. 2 analyzes the response of the US petroleum industry to the recent four Federal environmental rules on motor gasoline. Chap. 3 compares the EIA base or mid case energy projections for 1995 and 1996 (as published in the first quarter 1995 Outlook) with recent projections made by four other major forecasting groups. Chap. 4 evaluates the overall accuracy. Chap. 5 presents the methology used in the Short- Term Integrated Forecasting Model for oxygenate supply/demand balances. Chap. 6 reports theoretical and empirical results from a study of non-transportation energy demand by sector. The empirical analysis involves the short-run energy demand in the residential, commercial, industrial, and electrical utility sectors in US.

  19. Short-Term Energy Outlook Supplement: Uncertainties in the Short-Term Global Petroleum and Other Liquids Supply Forecast

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSettingUncertainties in the Short-Term

  20. aneurysm repair short-term: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is socially excessive. The empirical analysis shows that the short-term debt to reserves ratio is a robust predictor of -nancial crises, and that greater short-term...

  1. Short-term exploitative competition can explain human foraging patterns

    E-Print Network [OSTI]

    Saavedra, Serguei; Switanek, Nicholas; Uzzi, Brian

    2012-01-01T23:59:59.000Z

    Theory purports that animal foraging choices evolve to maximize returns, such as net energy intake. Empirical research in both human and nonhuman animals reveals that many times foraging choices are context dependent and affected by the foraging choices of others. Yet, broad empirical facts on the link between optimal foraging patterns, competition and context-dependent information are only now emerging due to the complication of gathering field data or constructing experiments. Here, we analyze foraging choices by a cohort of professional day traders who face the trade-off of trading the same stock multiple times in a row---patch exploitation---or switching to a different stock---patch exploration---with potentially higher returns. Our findings indicate that traders' foraging patterns are characterized by short-term comparative returns that decrease in proportion to patch exploitation and exploration, a novel measure that captures the difference between a trader's resource intake and the competitors' expecte...

  2. Short-term planning and forecasting for petroleum. Master's thesis

    SciTech Connect (OSTI)

    Elkins, R.D.

    1988-06-01T23:59:59.000Z

    The Defense Fuel Supply Center (DFSC) has, in recent past, been unable to adequately forecast for short-term petroleum requirements. This has resulted in inaccurate replenishment quantities and required short-notice corrections, which interrupted planned resupply methods. The relationship between the annual CINCLANTFLT DFM budget and sales from the the Norfolk Defense Fuel Support Point (DFSP) is developed and the past sales data from the Norfolk DFSP is used to construct seasonality indices. Finally, the budget/sales relationship is combined with the seasonality indices to provide a new forecasting model. The model is then compared with the current one for FY-88 monthly forecasts. The comparison suggests that the new model can provide accurate, timely requirements data and improve resupply of the Norfolk Defense Fuel Support Point.

  3. Estimating long-term mean winds from short-term wind data

    SciTech Connect (OSTI)

    Barchet, W.R.; Davis, W.E.

    1983-08-01T23:59:59.000Z

    The estimation of long-term mean winds from short-term data is especially important in the area of wind energy. It is desirable to obtain reliable estimates of the long-term wind speed from as short a period of on-site measurements as possible. This study examined seven different methods of estimating the long-term average wind speed and compared the performance of these techniques. Three linear, three weather pattern, and one eigenvector methods were compared for measurement periods ranging from 3 months to 36 months. Average errors, both relative and absolute, and the rms errors in the techniques were determined. The best technique for less than 12 months of measurement was the eigenvector method using weekly mean wind speeds. However, this method was only slightly better than the linear adjusted method. When 12 or more months of data were used, the difference in errors between techniques was found to be slight.

  4. Short-term energy outlook, quarterly projections, first quarter 1998

    SciTech Connect (OSTI)

    NONE

    1998-01-01T23:59:59.000Z

    The forecast period for this issue of the Outlook extends from the first quarter of 1998 through the fourth quarter of 1999. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the first quarter 1998 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are adjusted by EIA to reflect EIA assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the STIFS model. 24 figs., 19 tabs.

  5. Modular Operational Test Plans for Inferences on Software Reliability Based on a Markov Model

    E-Print Network [OSTI]

    Mazumdar, Mainak

    Modular Operational Test Plans for Inferences on Software Reliability Based on a Markov Model reliabilities. An operational test procedure is considered in which only the individual modules are tested and the system is considered acceptable if, and only if, no failures are observed. The minimum number of tests

  6. Implications of Wide-Area Geographic Diversity for Short- Term Variability of Solar Power

    SciTech Connect (OSTI)

    Mills, Andrew; Wiser, Ryan

    2010-08-23T23:59:59.000Z

    Worldwide interest in the deployment of photovoltaic generation (PV) is rapidly increasing. Operating experience with large PV plants, however, demonstrates that large, rapid changes in the output of PV plants are possible. Early studies of PV grid impacts suggested that short-term variability could be a potential limiting factor in deploying PV. Many of these early studies, however, lacked high-quality data from multiple sites to assess the costs and impacts of increasing PV penetration. As is well known for wind, accounting for the potential for geographic diversity can significantly reduce the magnitude of extreme changes in aggregated PV output, the resources required to accommodate that variability, and the potential costs of managing variability. We use measured 1-min solar insolation for 23 time-synchronized sites in the Southern Great Plains network of the Atmospheric Radiation Measurement program and wind speed data from 10 sites in the same network to characterize the variability of PV with different degrees of geographic diversity and to compare the variability of PV to the variability of similarly sited wind. The relative aggregate variability of PV plants sited in a dense 10 x 10 array with 20 km spacing is six times less than the variability of a single site for variability on time scales less than 15-min. We find in our analysis of wind and PV plants similarly sited in a 5 x 5 grid with 50 km spacing that the variability of PV is only slightly more than the variability of wind on time scales of 5-15 min. Over shorter and longer time scales the level of variability is nearly identical. Finally, we use a simple approximation method to estimate the cost of carrying additional reserves to manage sub-hourly variability. We conclude that the costs of managing the short-term variability of PV are dramatically reduced by geographic diversity and are not substantially different from the costs for managing the short-term variability of similarly sited wind in this region.

  7. Short term thermal energy storage Institut fr Kernenergetik und Energiesysteme, University of Stuttgart, Stuttgart, FRG

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    477 Short term thermal energy storage A. Abhat Institut für Kernenergetik und Energiesysteme the problem of short term thermal energy storage for low temperature solar heating applications. The techniques of sensible and latent heat storage are discussed, with particular emphasis on the latter

  8. Premium Ventilation Package Testing Short-Term Monitoring Report Task 7

    E-Print Network [OSTI]

    Premium Ventilation Package Testing Short-Term Monitoring Report ­ Task 7 Review Draft Submittal. 00038702 RTU AirCarePlus & Premium Ventilation Program COTR - Jack Callahan (503) 230-4496 / jmcallahan Ventilation Package Testing PECI Short-Term Monitoring Report ­ Task 7 REVIEW DRAFT: 9/14/2009 2 Table

  9. ANN-based Short-Term Load Forecasting in Electricity Markets

    E-Print Network [OSTI]

    Cañizares, Claudio A.

    ANN-based Short-Term Load Forecasting in Electricity Markets Hong Chen Claudio A. Ca~nizares Ajit1 Abstract--This paper proposes an Artificial Neu- ral Network (ANN)-based short-term load forecasting, electricity markets, spot prices, Artificial Neural Networks (ANN) I. Introduction Short

  10. Short-Term Generation Asset Valuation Chung-Li Tseng, Graydon Barz

    E-Print Network [OSTI]

    Short-Term Generation Asset Valuation Chung-Li Tseng, Graydon Barz Department of Civil Engineering 94305, USA chungli@eng.umd.edu, gbarz@leland.stanford.edu Abstract In this paper we present a method for valuing a power plant over a short-term period using Monte Carlo sim- ulation. The power plant valuation

  11. Short-term and long-term reliability studies in the deregulated power systems 

    E-Print Network [OSTI]

    Li, Yishan

    2006-04-12T23:59:59.000Z

    The electric power industry is undergoing a restructuring process. The major goals of the change of the industry structure are to motivate competition, reduce costs and improve the service quality for consumers. In the ...

  12. Next Generation Short-Term Forecasting of Wind Power Overview of the ANEMOS Project.

    E-Print Network [OSTI]

    Boyer, Edmond

    of difficulties to the power system operation. This is due to the fluctuating nature of wind generation to the management of wind generation. Accurate and reliable forecasting systems of the wind production are widely

  13. Independent transmission system operators and their role in maintaining reliability in a restructured electric power industry

    SciTech Connect (OSTI)

    NONE

    1998-01-01T23:59:59.000Z

    This report summarizes the current status of proposals to form Independent System Operators (ISOs) to operate high-voltage transmission systems in the United States and reviews their potential role in maintaining bulk power system reliability. As background information, the likely new industry structure, nature of deregulated markets, and institutional framework for bulk power system reliability are reviewed. The report identifies issues related to the formation of ISOs and their roles in markets and in reliability, and describes potential policy directions for encouraging the formation of effective ISOs and ensuring bulk system reliability. Two appendices are provided, which address: (1) system operation arrangements in other countries, and (2) summaries of regional U.S. ISO proposals.

  14. Using Information from Operating Experience to Inform Human Reliability Analysis

    SciTech Connect (OSTI)

    Bruce P. Hallbert; David I. Gertman; Julie Marble; Erasmia Lois; Nathan Siu

    2004-06-01T23:59:59.000Z

    This paper reports on efforts being sponsored by the U.S. NRC and performed by INEEL to develop a technical basis and perform work to extract information from sources for use in HRA. The objectives of this work are to: 1) develop a method for conducting risk-informed event analysis of human performance information that stems from operating experience at nuclear power plants and for compiling and documenting the results in a structured manner; 2) provide information from these analyses for use in risk-informed and performance-based regulatory activities; 3) create methods for information extraction and a repository for this information that, likewise, support HRA methods and their applications.

  15. R3TOS: A Reliable Reconfigurable Real-Time Operating System Xabier Iturbe1,2

    E-Print Network [OSTI]

    Arslan, Tughrul

    R3TOS: A Reliable Reconfigurable Real-Time Operating System Xabier Iturbe1,2 , Khaled Benkrid1-Time Operating System (R3TOS) are presented. The main objective of R3TOS is to create an infrastruc- ture faults in the underlying chip's silicon at runtime (true fault re- moval from system). R3TOS is aimed

  16. An Exploration of Participant Motives and Motivational Tensions in Short-Term Medical Service Trips

    E-Print Network [OSTI]

    Sykes, Kevin James

    2014-05-31T23:59:59.000Z

    Short-term medical service trips (MSTs) are an increasingly popular, although not new, way for healthcare providers from high-income countries (HICs) to provide healthcare in low- and middle-income countries (LMICs). In ...

  17. SHORT-TERM FORECASTING OF SOLAR RADIATION BASED ON SATELLITE DATA WITH STATISTICAL METHODS

    E-Print Network [OSTI]

    Heinemann, Detlev

    SHORT-TERM FORECASTING OF SOLAR RADIATION BASED ON SATELLITE DATA WITH STATISTICAL METHODS Annette governing the insolation, forecasting of solar radiation makes the description of development of the cloud

  18. Evaluation of forecasting techniques for short-term demand of air transportation

    E-Print Network [OSTI]

    Wickham, Richard Robert

    1995-01-01T23:59:59.000Z

    Forecasting is arguably the most critical component of airline management. Essentially, airlines forecast demand to plan the supply of services to respond to that demand. Forecasts of short-term demand facilitate tactical ...

  19. Short-term Migration, Rural Workfare Programs and Urban Labor Markets: Evidence from India

    E-Print Network [OSTI]

    Bandyopadhyay, Antar

    , a simple calibration exercise reveals that small changes in short-term migration can have large impacts of migration in developing countries (Banerjee and Duo, 2007; Badiani and Sar, 2009; Morten, 2012). In 2007

  20. Short-Term Effects of Air Pollution on Wheeze in Asthmatic Children in Fresno, California

    E-Print Network [OSTI]

    2010-01-01T23:59:59.000Z

    Short-Term Effects of Air Pollution on Wheeze in Asthmaticchanges in ambient air pollution. Our data suggest the need2004. The effect of air pollution on lung development from

  1. SPE 124332 (revised) Hierarchical Long-Term and Short-Term Production Optimization

    E-Print Network [OSTI]

    Van den Hof, Paul

    . In our study we used a 3-dimensional reservoir in a fluvial depositional environment with a production at maximizing short-term production. The optimal life-cycle waterflooding strategy that includes short

  2. Quantifying the Operational Benefits of Conventional and Advanced Pumped Storage Hydro on Reliability and Efficiency: Preprint

    SciTech Connect (OSTI)

    Krad, I.; Ela, E.; Koritarov, V.

    2014-07-01T23:59:59.000Z

    Pumped storage hydro (PSH) plants have significant potential to provide reliability and efficiency benefits in future electric power systems with high penetrations of variable generation. New PSH technologies, such as adjustable-speed PSH, have been introduced that can also present further benefits. This paper demonstrates and quantifies some of the reliability and efficiency benefits afforded by PSH plants by utilizing the Flexible Energy Scheduling Tool for the Integration of Variable generation (FESTIV), an integrated power system operations tool that evaluates both reliability and production costs.

  3. Characterizing short-term stability for Boolean networks over any distribution of transfer functions

    E-Print Network [OSTI]

    C. Seshadhri; Andrew M. Smith; Yevgeniy Vorobeychik; Jackson Mayo; Robert C. Armstrong

    2014-09-15T23:59:59.000Z

    We present a characterization of short-term stability of random Boolean networks under \\emph{arbitrary} distributions of transfer functions. Given any distribution of transfer functions for a random Boolean network, we present a formula that decides whether short-term chaos (damage spreading) will happen. We provide a formal proof for this formula, and empirically show that its predictions are accurate. Previous work only works for special cases of balanced families. It has been observed that these characterizations fail for unbalanced families, yet such families are widespread in real biological networks.

  4. Short-term effects of Gamma Ray Bursts on oceanic photosynthesis

    E-Print Network [OSTI]

    Penate, Liuba; Cardenas, Rolando; Agusti, Susana

    2010-01-01T23:59:59.000Z

    We continue our previous work on the potential short-term influence of a gamma ray bursts on Earth's biosphere, focusing on the only important short-term effect on life: the ultraviolet flash which occurs as a result of the retransmission of the {\\gamma} radiation through the atmosphere. Thus, in this work we calculate the ultraviolet irradiances penetrating the first hundred meters of the water column, for Jerlov's ocean water types I, II and III. Then we estimate the UV flash potential for photosynthesis inhibition, showing that it can be important in a considerable part of the water column with light enough for photosynthesis to be done, the so called photic zone.

  5. Wind turbine reliability :understanding and minimizing wind turbine operation and maintenance costs.

    SciTech Connect (OSTI)

    Walford, Christopher A. (Global Energy Concepts. Kirkland, WA)

    2006-03-01T23:59:59.000Z

    Wind turbine system reliability is a critical factor in the success of a wind energy project. Poor reliability directly affects both the project's revenue stream through increased operation and maintenance (O&M) costs and reduced availability to generate power due to turbine downtime. Indirectly, the acceptance of wind-generated power by the financial and developer communities as a viable enterprise is influenced by the risk associated with the capital equipment reliability; increased risk, or at least the perception of increased risk, is generally accompanied by increased financing fees or interest rates. This paper outlines the issues relevant to wind turbine reliability for wind turbine power generation projects. The first sections describe the current state of the industry, identify the cost elements associated with wind farm O&M and availability and discuss the causes of uncertainty in estimating wind turbine component reliability. The latter sections discuss the means for reducing O&M costs and propose O&M related research and development efforts that could be pursued by the wind energy research community to reduce cost of energy.

  6. Determining Long-Term Performance of Cool Storage Systems from Short-Term Tests, Final Report

    E-Print Network [OSTI]

    Reddy, T. A.; Elleson, J.; Haberl, J. S.

    2000-01-01T23:59:59.000Z

    This is the final report for ASHRAE Research Project 1004-RP: Determining Long-Term Performance of Cool Storage Systems from Short-Term Tests. This report presents the results of the development and application of the methodology to Case Study #2...

  7. Short term effects of moderate carbon prices on land use in the New Zealand emissions trading

    E-Print Network [OSTI]

    Silver, Whendee

    Short term effects of moderate carbon prices on land use in the New Zealand emissions trading Zealand Emissions Trading Scheme (NZ ETS) was introduced through the Climate Change Response Act............................................................................ 14 #12;1 1 Introduction The New Zealand Emissions Trading Scheme (NZ ETS) was legislated through

  8. Primal-Dual Interior Point Method Applied to the Short Term Hydroelectric Scheduling Including a

    E-Print Network [OSTI]

    Oliveira, Aurélio R. L.

    that minimizes losses in the transmission and costs in the generation of a hydroelectric power system, formulated such perturbing parameter. Keywords-- Hydroelectric power system, Network flow, Predispatch, Primal-dual interiorPrimal-Dual Interior Point Method Applied to the Short Term Hydroelectric Scheduling Including

  9. Longitudinal Analysis of Short term Bronchiolitis Air Pollution Association using Semi Parametric Models

    E-Print Network [OSTI]

    Mesbah, Mounir

    1 Longitudinal Analysis of Short term Bronchiolitis Air Pollution Association using Semi Parametric of ambient air pollution on infant bronchiolitis hospital consultations. Infant bronchiolitis is a frequent pollution, semi parametric models. 1.1 Introduction Time-series studies of air pollution and health

  10. Instructions for use Short-term Glacier Velocity Changes at West Kunlun

    E-Print Network [OSTI]

    Tsunogai, Urumu

    to global warming could further accelerate glacier15 flow and potentially lead to significant lossInstructions for use #12;Short-term Glacier Velocity Changes at West Kunlun Shan, Northwest Tibet. Abstract Seasonal glacier velocity changes across the High Arctic, including the Green- land Ice Sheet

  11. SHORT-TERM THERMAL RESISTANCE OF ZOEAE OF 10 SPECIES OF CRABS FROM PUGET SOUND, WASHINGTON

    E-Print Network [OSTI]

    SHORT-TERM THERMAL RESISTANCE OF ZOEAE OF 10 SPECIES OF CRABS FROM PUGET SOUND, WASHINGTON BENJAMIN to protect the most sensitive species studied is 24OC for the Puget Sound area. Thermal resistance of marine species of Puget INorthwest and Alaska Fisheries Center, National Marine Fisheries Service, NOAA, 2725

  12. Ethical Considerations for Short-term Experiences by Trainees in Global Health

    E-Print Network [OSTI]

    Tipple, Brett

    -constrained health care set- tings, trainees from resource-replete environments may have inflated ideas aboutCOMMENTARY Ethical Considerations for Short-term Experiences by Trainees in Global Health John A. Crump, MB, ChB, DTM&H Jeremy Sugarman, MD, MPH, MA A CADEMIC GLOBAL HEALTH PROGRAMS ARE BURGEON- ing.1

  13. Managing Short-Term Electricity Contracts Under Uncertainty: A Minimax Approach

    E-Print Network [OSTI]

    Ahmed, Shabbir

    Managing Short-Term Electricity Contracts Under Uncertainty: A Minimax Approach Samer Takriti Heights, New York 10598, USA, takriti@us.ibm.com School of Industrial & Systems Engineering, Georgia Institute of Technology, 765 Ferst Drive, Atlanta, Georgia 30332, USA, sahmed@isye.gatech.edu. The work

  14. PRIMARY RESEARCH PAPER Short-term responses of decomposers to flow restoration

    E-Print Network [OSTI]

    LeRoy, Carri J.

    most stream restoration projects, lack pre-restoration data and clearly defined goals, making et al., 2005; Bernhardt et al., 2005). Biotic recovery in response to stream restoration can be rapidPRIMARY RESEARCH PAPER Short-term responses of decomposers to flow restoration in Fossil Creek

  15. Short-term Forecasting of Offshore Wind Farm Production Developments of the Anemos Project

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Short-term Forecasting of Offshore Wind Farm Production ­ Developments of the Anemos Project J to the large dimensions of offshore wind farms, their electricity production must be known well in advance networks) models were calibrated on power data from two offshore wind farms: Tunoe and Middelgrunden

  16. Short-Term Hurricane Impacts on a Neotropical Community of Marked Birds and Implications for Early-

    E-Print Network [OSTI]

    Winker, Kevin

    Short-Term Hurricane Impacts on a Neotropical Community of Marked Birds and Implications for Early- Stage Community Resilience Andrew B. Johnson1,2 , Kevin Winker1 * 1 University of Alaska Museum birds, following this community through the catastrophic destruction of its forest habitat by Hurricane

  17. Behavioral/Systems/Cognitive Short-Term Synaptic Depression Causes a Non-Monotonic

    E-Print Network [OSTI]

    Parga, Néstor

    Behavioral/Systems/Cognitive Short-Term Synaptic Depression Causes a Non-Monotonic Response to the postsynaptic cell because a large fraction of the spikes fail to elicit a synaptic response. In addition, short of incoming spikes as these are first converted into synaptic current and afterward into the cell response

  18. SHORT-TERM EFFECTS OF SOIL AMENDMENT WITH TREE LEGUME BIOMASS ON CARBON AND NITROGEN

    E-Print Network [OSTI]

    Lehmann, Johannes

    SHORT-TERM EFFECTS OF SOIL AMENDMENT WITH TREE LEGUME BIOMASS ON CARBON AND NITROGEN IN PARTICLE-to-N ratio of the added plant material seems to control the eects of soil amendment with tree legume biomass to the total quantity of C and N pre- sent. Physical fractionation of SOM can help to identify more active

  19. SHORT TERM PREDICTIONS FOR THE POWER OUTPUT OF ENSEMBLES OF WIND TURBINES AND PV-GENERATORS

    E-Print Network [OSTI]

    Heinemann, Detlev

    SHORT TERM PREDICTIONS FOR THE POWER OUTPUT OF ENSEMBLES OF WIND TURBINES AND PV-GENERATORS Hans the state of the art of power predictios for wind and solar power plants.with a time horizon of several market there is a need for a forecast of the power production of wind and solar generators with time

  20. A survey of HVDC operating and maintenance practices and their impact on reliability and performance

    SciTech Connect (OSTI)

    Cochrane, J.J.; Emerson, M.P. [New England Power Co., Ayer, MA (United States)] [New England Power Co., Ayer, MA (United States); Donahue, J.A. [New England Power Service Co., Westborough, MA (United States)] [New England Power Service Co., Westborough, MA (United States); Wolf, G. [Public Service of New Mexico, Albuquerque, NM (United States)] [Public Service of New Mexico, Albuquerque, NM (United States)

    1996-01-01T23:59:59.000Z

    A questionnaire about operating, maintenance, and spare parts practices and station performance was sent to all HVDC converter stations worldwide. This survey is sponsored by IEEE Working Groups 15.05.08, Economics and Operating Strategies, and I7, Reliability of HVDC Converter Stations. Responses from 38 stations are analyzed, and information bout the most popular practices is reported. One important conclusion is that energy contracts, ac system constraints, and dedicated generation frequency have strong influences on the operation and maintenance practices of HVDC stations. A search is made for correlations between the operating, maintenance, and spare parts practices, including spending, and the stations` performance and availability. No conclusions about the most cost-effective practices can be made. The results are compared with those of a study published in 1992 which covered a few of the same topics.

  1. Short-term effects of air pollution: a panel study of blood markers in patients with chronic pulmonary disease

    E-Print Network [OSTI]

    2009-01-01T23:59:59.000Z

    Short-term effects of air pollution: a panel study of bloodindicates that ambient air pollution is associated withto daily changes in air pollution in Erfurt, Germany. 12

  2. Measuring Short-term Air Conditioner Demand Reductions for Operations and Settlement

    E-Print Network [OSTI]

    Bode, Josh

    2013-01-01T23:59:59.000Z

    measurements using smart meter household data produce theof program households. Smart meters lower the cost of usingsample sizes with smart meter data can be far larger than

  3. Measuring Short-term Air Conditioner Demand Reductions for Operations and Settlement

    E-Print Network [OSTI]

    Bode, Josh

    2013-01-01T23:59:59.000Z

    regions. In addition, the SCADA was not available for allData Real Time Visibility SCADA 5 minutes or less Limited

  4. Measuring Short-term Air Conditioner Demand Reductions for Operations and Settlement

    E-Print Network [OSTI]

    Bode, Josh

    2013-01-01T23:59:59.000Z

    of California Statewide Aggregator Demand Response Programs.Analysis of AMP Aggregator Demand Response Program. Preparedof California Statewide Aggregator Demand Response Programs.

  5. Measuring Short-term Air Conditioner Demand Reductions for Operations and Settlement

    E-Print Network [OSTI]

    Bode, Josh

    2013-01-01T23:59:59.000Z

    93 Figure I-1: Electricty Use for a Specific Feeder in Santerritory. Figure I-1: Electricty Use for a Specific Feeder

  6. Measuring Short-term Air Conditioner Demand Reductions for Operations and Settlement

    E-Print Network [OSTI]

    Bode, Josh

    2013-01-01T23:59:59.000Z

    017F.PDF KEMA, Inc. 2011. PJM Empirical Analysis of DemandMethods. Prepared for the PJM Markets Implementation~/media/markets-ops/dsr/pjm-analysis-of-dr-baseline-methods-

  7. Short-Term Energy Tests of a Credit Union Building in Idaho (Draft)

    SciTech Connect (OSTI)

    Subbarao, K.; Balcomb, J. D.

    1993-01-01T23:59:59.000Z

    This report describes tests and results of the energy performance of a credit union building in Idaho. The building is in the Energy Edge Program administered by the Bonneville Power Administration (BPA). BPA provided incentives to incorporate innovative features designed to conserve energy use by the building. It is of interest to determine the actual performance of these features. The objective of this project was to evaluate the applicability of the SERI short-term energy monitoring (STEM) method to nonresidential buildings.

  8. Short term generation scheduling in photovoltaic-utility grid with battery storage

    SciTech Connect (OSTI)

    Marwali, M.K.C.; Ma, H.; Shahidehpour, S.M. [Illinois Inst. of Tech., Chicago, IL (United States). Dept. of Electrical and Computer Engineering] [Illinois Inst. of Tech., Chicago, IL (United States). Dept. of Electrical and Computer Engineering; Abdul-Rahman, K.H. [Siemens Energy and Automation, Brooklyn Park, MN (United States)] [Siemens Energy and Automation, Brooklyn Park, MN (United States)

    1998-08-01T23:59:59.000Z

    This paper presents an efficient approach to short term resource scheduling for an integrated thermal and photovoltaic-battery generation. The proposed model incorporated battery storage for peak load shaving. Several constraints including battery capacity, minimum up/down time and ramp rates for thermal units, as well as natural photovoltaic (PV) capacity are considered in the proposed model. A case study composed of 26 thermal units and a PV-battery plant is presented to test the efficiency of the method.

  9. Performance and nutrient utilization of steers fed short term reconstituted grains

    E-Print Network [OSTI]

    Simpson, Edward James

    1982-01-01T23:59:59.000Z

    experiment. The ration's were composed on a dry basis of 86X grain and 14X of the same protein supplement used in the feeding experiment. Eight Beefmaster crossbred steers of the same origin and weight as those used in the growth trial were assigned...PERFORMANCE AND NUTRIENT UTILIZATION OF STEERS FED SHORT TERM RECONSTITUTED GRAINS A Thesis by EDWARD JAMES SIMPSON, JR. Submitted to the Graduate College of Texas ASM University in partial fulfillment of the requirement for the degree...

  10. Short-term energy outlook. Quarterly projections, 2nd quarter 1994

    SciTech Connect (OSTI)

    Not Available

    1994-05-01T23:59:59.000Z

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. The forecast period for this issue of the Outlook extends from the second quarter of 1994 through the fourth quarter of 1995. Values for the first quarter of 1994, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available. The historical energy data, compiled into the second quarter 1994 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the STIFS. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. The EIA model is available on computer tape from the National Technical Information Service.

  11. ORIGINAL PAPER Short-term effect of tillage intensity on N2O and CO2 emissions

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    ORIGINAL PAPER Short-term effect of tillage intensity on N2O and CO2 emissions Pascal Boeckx negative to positive. We studied the short-term effect of tillage intensity on N2O and CO2 emissions. We site, an intermediately aerated Luvisol in Belgium, were similar. Nitrous oxide and CO2 emissions were

  12. Turbine Reliability and Operability Optimization through the use of Direct Detection Lidar Final Technical Report

    SciTech Connect (OSTI)

    Johnson, David K; Lewis, Matthew J; Pavlich, Jane C; Wright, Alan D; Johnson, Kathryn E; Pace, Andrew M

    2013-02-01T23:59:59.000Z

    The goal of this Department of Energy (DOE) project is to increase wind turbine efficiency and reliability with the use of a Light Detection and Ranging (LIDAR) system. The LIDAR provides wind speed and direction data that can be used to help mitigate the fatigue stress on the turbine blades and internal components caused by wind gusts, sub-optimal pointing and reactionary speed or RPM changes. This effort will have a significant impact on the operation and maintenance costs of turbines across the industry. During the course of the project, Michigan Aerospace Corporation (MAC) modified and tested a prototype direct detection wind LIDAR instrument; the resulting LIDAR design considered all aspects of wind turbine LIDAR operation from mounting, assembly, and environmental operating conditions to laser safety. Additionally, in co-operation with our partners, the National Renewable Energy Lab and the Colorado School of Mines, progress was made in LIDAR performance modeling as well as LIDAR feed forward control system modeling and simulation. The results of this investigation showed that using LIDAR measurements to change between baseline and extreme event controllers in a switching architecture can reduce damage equivalent loads on blades and tower, and produce higher mean power output due to fewer overspeed events. This DOE project has led to continued venture capital investment and engagement with leading turbine OEMs, wind farm developers, and wind farm owner/operators.

  13. DOBEIA-0202(83/4Q) Short-Term Energy Outlook Quarterly Projections

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline prices4ConsumptionDOBEIA-0202(83/4Q) Short-Term

  14. DOE/EIA-0202(84/3Q) Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline353/06) 2Yonthly Energy : 4 aI la3Q) Short-Term

  15. Short-Term Energy Outlook Supplement: Weather Sensitivity in Natural Gas Markets

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTownDells,1Stocks Nov-14 Dec-14Table 4.April19.Data Series: ProvedShort-Term

  16. Short-term energy outlook, October 1998. Quarterly projections, 1998 4. quarter

    SciTech Connect (OSTI)

    NONE

    1998-10-01T23:59:59.000Z

    The Energy Information Administration (EIA) prepares The Short-Term Energy Outlook (energy supply, demand, and price projections) monthly for distribution on the Internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. In addition, printed versions of the report are available to subscribers in January, April, July and October. The forecast period for this issue of the Outlook extends from October 1998 through December 1999. Values for third quarter of 1998 data, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the October 1998 version of the Short-term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding.

  17. Research on Short-term Load Forecasting of the Thermoelectric Boiler Based on a Dynamic RBF Neural Network 

    E-Print Network [OSTI]

    Dai, W.; Zou, P.; Yan, C.

    2006-01-01T23:59:59.000Z

    As thermal inertia is the key factor for the lag of thermoelectric utility regulation, it becomes very important to forecast its short-term load according to running parameters. In this paper, dynamic radial basis function (RBF) neural network...

  18. Using futures prices to filter short-term volatility and recover a latent, long-term price series for oil

    E-Print Network [OSTI]

    Herce, Miguel Angel

    2006-01-01T23:59:59.000Z

    Oil prices are very volatile. But much of this volatility seems to reflect short-term,transitory factors that may have little or no influence on the price in the long run. Many major investment decisions should be guided ...

  19. Use of Frequency Response Metrics to Assess the Planning and Operating Requirements for Reliable Integration of Variable Renewable Generation

    SciTech Connect (OSTI)

    Eto, Joseph H.; Undrill, John; Mackin, Peter; Daschmans, Ron; Williams, Ben; Haney, Brian; Hunt, Randall; Ellis, Jeff; Illian, Howard; Martinez, Carlos; O'Malley, Mark; Coughlin, Katie; LaCommare, Kristina Hamachi

    2010-12-20T23:59:59.000Z

    An interconnected electric power system is a complex system that must be operated within a safe frequency range in order to reliably maintain the instantaneous balance between generation and load. This is accomplished by ensuring that adequate resources are available to respond to expected and unexpected imbalances and restoring frequency to its scheduled value in order to ensure uninterrupted electric service to customers. Electrical systems must be flexible enough to reliably operate under a variety of"change" scenarios. System planners and operators must understand how other parts of the system change in response to the initial change, and need tools to manage such changes to ensure reliable operation within the scheduled frequency range. This report presents a systematic approach to identifying metrics that are useful for operating and planning a reliable system with increased amounts of variable renewable generation which builds on existing industry practices for frequency control after unexpected loss of a large amount of generation. The report introduces a set of metrics or tools for measuring the adequacy of frequency response within an interconnection. Based on the concept of the frequency nadir, these metrics take advantage of new information gathering and processing capabilities that system operators are developing for wide-area situational awareness. Primary frequency response is the leading metric that will be used by this report to assess the adequacy of primary frequency control reserves necessary to ensure reliable operation. It measures what is needed to arrest frequency decline (i.e., to establish frequency nadir) at a frequency higher than the highest set point for under-frequency load shedding within an interconnection. These metrics can be used to guide the reliable operation of an interconnection under changing circumstances.

  20. Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues

    SciTech Connect (OSTI)

    Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

    2008-07-01T23:59:59.000Z

    California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

  1. Winchester/Camberley Homes New Construction Test House Design, Construction, and Short-Term Testing in a Mixed-Humid Climate

    SciTech Connect (OSTI)

    Mallav, D.; Wiehagen, J.; Wood, A.

    2012-10-01T23:59:59.000Z

    The NAHB Research Center partnered with production builder Winchester/Camberley Homes to build a DOE Building America New Construction Test House (NCTH). This single family, detached house, located in the mixed-humid climate zone of Silver Spring, MD, was completed in June 2011. The primary goal for this house was to improve energy efficiency by 30% over the Building America B10 benchmark by developing and implementing an optimized energy solutions package design that could be cost effectively and reliably constructed on a production basis using quality management practices. The intent of this report is to outline the features of this house, discuss the implementation of the energy efficient design, and report on short-term testing results. During the interactive design process of this project, numerous iterations of the framing, air sealing, insulation, and space conditioning systems were evaluated for energy performance, cost, and practical implementation. The final design featured numerous advanced framing techniques, high levels of insulation, and the HVAC system entirely within conditioned space. Short-term testing confirmed a very tight thermal envelope and efficient and effective heating and cooling. In addition, relevant heating, cooling, humidity, energy, and wall cavity moisture data will be collected and presented in a future long-term report.

  2. Short-term Variations in the Galactic Environment of the Sun

    E-Print Network [OSTI]

    Priscilla C. Frisch; Jonathan D. Slavin

    2006-01-17T23:59:59.000Z

    The galactic environment of the Sun varies over short timescales as the Sun and interstellar clouds travel through space. Small variations in the dynamics, ionization, density, and magnetic field strength of the interstellar medium (ISM) surrounding the Sun yield pronounced changes in the heliosphere. We discuss essential information required to understand short-term variations in the galactic environment of the Sun, including the distribution and radiative transfer properties of nearby ISM, and variations in the boundary conditions of the heliosphere as the Sun traverses clouds. The most predictable transitions are when the Sun emerged from the Local Bubble interior and entered the cluster of local interstellar clouds flowing past the Sun, within the past 140,000 years, and again when the Sun entered the local interstellar cloud now surrounding and inside of the solar system, sometime during the past 44,000 years.

  3. Short-Term Energy Monitoring (STEM): Application of the PSTAR method to a residence in Fredericksburg, Virginia

    SciTech Connect (OSTI)

    Subbarao, K.; Burch, J.D.; Hancock, C.E.; Lekov, A.; Balcomb, J.D.

    1988-09-01T23:59:59.000Z

    This report describes a project to assess the thermal quality of a residential building based on short-term tests during which a small number of data channels are measured. The project is called Short- Term Energy Monitoring (STEM). Analysis of the data provides extrapolation to long-term performance. The test protocol and analysis are based on a unified method for building simulations and short-term testing called Primary and Secondary Terms Analysis and Renormalization (PSTAR). In the PSTAR method, renormalized parameters are introduced for the primary terms such that the renormalized energy balance is best satisfied in the least squares sense; hence, the name PSTAR. The mathematical formulation of PSTAR is detailed in earlier reports. This report describes the short-term tests and data analysis performed using the PSTAR method on a residential building in Fredricksburg, Virginia. The results demonstrate the ability of the PSTAR method to provide a realistically complex thermal model of a building, and determine from short-term tests the statics as well as the dynamics of a building, including solar dynamics. 10 refs., 12 figs., 2 tabs.

  4. Short-term and creep shear characteristics of a needlepunched thermally locked geosynthetic clay liner

    SciTech Connect (OSTI)

    Siebken, J.R. [National Seal Co., Galesburg, IL (United States). Technical Services; Swan, R.H. Jr.; Yuan, Z. [GeoSyntec Consultants, Atlanta, GA (United States). Soil-Geosynthetic Interaction Testing Lab.

    1997-11-01T23:59:59.000Z

    A series of constant-rate direct shear tests were conducted on a needlepunched thermally locked geosynthetic clay liner (GCL) in accordance with ASTM Test Method for Determining the Coefficient of Soil and Geosynthetic or Geosynthetic and Geosynthetic Friction by the Direct Shear Method (D 5321). The test results demonstrate that the needlepunched thermally locked reinforcing fibers provide substantial short-term shear strength to a GCL. However, there is a growing concern that the long-term shear strength to a GCL. However, there is a growing concern that the long-term shear strength of this type of GCL can be affected due to the potential of creep within the reinforcing fibers under sustained constant loads which occur in the field. An attempt was made to address this concern through an incrementally-loaded creep shear test conducted in a newly developed constant-load (creep) shear testing device. The results of the creep shear test to date show that the GCL has undergone relatively small shear displacements with incremental shear rates decreasing with time within each loading phase.

  5. Oxygenate Supply/Demand Balances in the Short-Term Integrated Forecasting Model (Released in the STEO March 1998)

    Reports and Publications (EIA)

    1998-01-01T23:59:59.000Z

    The blending of oxygenates, such as fuel ethanol and methyl tertiary butyl ether (MTBE), into motor gasoline has increased dramatically in the last few years because of the oxygenated and reformulated gasoline programs. Because of the significant role oxygenates now have in petroleum product markets, the Short-Term Integrated Forecasting System (STIFS) was revised to include supply and demand balances for fuel ethanol and MTBE. The STIFS model is used for producing forecasts in the Short-Term Energy Outlook. A review of the historical data sources and forecasting methodology for oxygenate production, imports, inventories, and demand is presented in this report.

  6. Integration of renewable energy sources: reliability-constrained power system planning and operations using computational intelligence 

    E-Print Network [OSTI]

    Wang, Lingfeng

    2009-05-15T23:59:59.000Z

    studied in the dissertation include reliability evaluation of power systems with time-dependent energy sources, multi-objective design of hybrid generation systems, risk and cost tradeoff in economic dispatch with wind power penetration, optimal placement...

  7. Short Term Irradiation Test of Fuel Containing Minor Actinides Using the Experimental Fast Reactor Joyo

    SciTech Connect (OSTI)

    Sekine, Takashi; Soga, Tomonori; Koyama, Shin-ichi; Aoyama, Takafumi [Oarai Research and Development Center, Japan Atomic Energy Agency. 4002 Narita, Oarai, Ibaraki 311-1393 (Japan); Wootan, David [Pacific Northwest National Laboratoy, M/S K8-34, P.O. Box 999 Richland, WA 99352 (United States)

    2007-07-01T23:59:59.000Z

    A mixed oxide containing minor actinides (MA-MOX) fuel irradiation program is being conducted using the experimental fast rector Joyo of the Japan Atomic Energy Agency to research early thermal behavior of MA-MOX fuel. Two irradiation experiments were conducted as part of the short-term phase of this program in May and August 2006. Six prepared fuel pins included MOX fuel containing 3% or 5% americium (Am-MOX), and MOX fuel containing 2% americium and 2% neptunium (Np/Am-MOX). The first test was conducted with high linear heat rates of approximately 430 W/cm maintained during only 10 minutes. After 10 minutes irradiation test, the test subassembly was transferred to the hot cell facility and an Am-MOX pin and a Np/Am-MOX pin were replaced with dummy pins with neutron dosimeters. The test subassembly loaded with the remaining four fuel pins was re-irradiated in Joyo for 24-hours in August 2006 at nearly the same linear power to obtain re-distribution data on MA-MOX fuel. The linear heat rate for each MA-MOX test fuel pin was calculated using the Monte Carlo calculation code MCNP. The calculated fission rates were compared with the measured data based on the Nd-148 method. The maximum linear heat rate was approximately 444{+-}19 W/cm at the actual reactor power of 119.6 MWt. Post irradiation examination of these pins to confirm the absence of fuel melting and the local concentration under irradiation of NpO{sub 2-x} or AmO{sub 2-x}, in the (U,Pu)0{sub 2-x}, fuel are underway. The test results are expected to reduce uncertainties on the margin in the thermal design for MA-MOX fuel. (authors)

  8. Image-Guided Techniques Improve the Short-term Outcome of Autologous Osteochondral Cartilage Repair Surgeries -An

    E-Print Network [OSTI]

    Stewart, James

    Image-Guided Techniques Improve the Short-term Outcome of Autologous Osteochondral Cartilage Repair and deliver osteochondral grafts remains problematic. We investigated whether image-guided methods (optically-guided and template-guided) can improve the outcome of mo- saic arthroplasty procedures. Methods: Fifteen sheep were

  9. Short-term Wind Power Prediction for Offshore Wind Farms -Evaluation of Fuzzy-Neural Network Based Models

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Short-term Wind Power Prediction for Offshore Wind Farms - Evaluation of Fuzzy-Neural Network Based of offshore farms and their secure integration to the grid. Modeling the behavior of large wind farms presents the new considerations that have to be made when dealing with large offshore wind farms

  10. Short-term effects of oestradiol, T3 or insulin infusions on plasma concentrations and estimated hepatic balances

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Short-term effects of oestradiol, T3 or insulin infusions on plasma concentrations and estimated infusions on interme- diary and hepatic metabolism were studied in 4 preruminant male calves fed milk replac/kg BW), infused during the first h after feeding. Metabolite concentrations were determined

  11. 1256 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 18, NO. 4, NOVEMBER 2003 Short-Term Hydrothermal Generation Scheduling

    E-Print Network [OSTI]

    Catholic University of Chile (Universidad Católica de Chile)

    long and mid-term models, have been used to optimize the amount of hydro energy to be used during1256 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 18, NO. 4, NOVEMBER 2003 Short-Term Hydrothermal are obtained for each of both hydro and thermal units. Future cost curves of hydro generation, obtained from

  12. Neurocomputing 70 (2007) 16261629 A biophysical model of short-term plasticity at the calyx of Held

    E-Print Network [OSTI]

    Graham, Bruce

    2007-01-01T23:59:59.000Z

    dynamics, which include passive and activity-dependent recycling, calcium-dependent exocytosis activity-dependent vesicle recycling and a limited number of vesicle docking sites at each active zone. r- and postsynaptic factors. Earlier work has led to the vesicle depletion model for short-term synaptic depression

  13. Short-term supply chain management in upstream natural gas systems

    E-Print Network [OSTI]

    Selot, Ajay

    2009-01-01T23:59:59.000Z

    Natural gas supply chain planning and optimization is important to ensure security and reliability of natural gas supply. However, it is challenging due to the distinctive features of natural gas supply chains. These ...

  14. Use of short-term test systems for the prediction of the hazard represented by potential chemical carcinogens

    SciTech Connect (OSTI)

    Glass, L.R.; Jones, T.D.; Easterly, C.E.; Walsh, P.J.

    1990-10-01T23:59:59.000Z

    It has been hypothesized that results from short-term bioassays will ultimately provide information that will be useful for human health hazard assessment. Historically, the validity of the short-term tests has been assessed using the framework of the epidemiologic/medical screens. In this context, the results of the carcinogen (long-term) bioassay is generally used as the standard. However, this approach is widely recognized as being biased and, because it employs qualitative data, cannot be used to assist in isolating those compounds which may represent a more significant toxicologic hazard than others. In contrast, the goal of this research is to address the problem of evaluating the utility of the short-term tests for hazard assessment using an alternative method of investigation. Chemicals were selected mostly from the list of carcinogens published by the International Agency for Research on Carcinogens (IARC); a few other chemicals commonly recognized as hazardous were included. Tumorigenicity and mutagenicity data on 52 chemicals were obtained from the Registry of Toxic Effects of Chemical Substances (RTECS) and were analyzed using a relative potency approach. The data were evaluated in a format which allowed for a comparison of the ranking of the mutagenic relative potencies of the compounds (as estimated using short-term data) vs. the ranking of the tumorigenic relative potencies (as estimated from the chronic bioassays). Although this was a preliminary investigation, it offers evidence that the short-term tests systems may be of utility in ranking the hazards represented by chemicals which may contribute to increased carcinogenesis in humans as a result of occupational or environmental exposures. 177 refs., 8 tabs.

  15. CHANGES IN THE ELECTRICAL SURFACE CHARGE AND TRANSPLANTATION PROPERTIES OF TA3 ASCITES TUMOR CELLS DURING SHORT-TERM MAINTENANCE IN AN ISOTONIC SALT SOLUTION

    E-Print Network [OSTI]

    Tenforde, T.S.

    2013-01-01T23:59:59.000Z

    CELLS DURING SHORT-TERM MAINTENANCE IN AN ISOTONIC SALTcells. In conclusion, the maintenance of TA3 ascites cellslhort-term tumor cell maintenance in vitro. REFERENCES

  16. Short-term Wind Power Forecasting Using Advanced Statistical T.S. Nielsen1

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    , in order to be able to absorb a large fraction of wind power in the electrical systems reliable short from refer- ence MET forecasts to the actual wind farm, wind farm power curve models, dynamical models of art wind power prediction system is outlined in Section 2. Numerical Weather Prediction (NWP

  17. The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations

    SciTech Connect (OSTI)

    Kirby, Brendan J [ORNL

    2006-07-01T23:59:59.000Z

    Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second, market and reliability rules have, understandably, been written around the capabilities and limitations of generators, the historic reliability resources. Responsive load limitations and capabilities are often not accommodated in markets or reliability criteria. Third, because of the institutional structure, demand response alternatives are treated as temporary solutions that can delay but not replace transmission enhancement. Financing has to be based on a three to five year project life as opposed to the twenty to fifty year life of transmission facilities. More can be done to integrate demand response options into transmission expansion planning. Given the societal benefits it may be appropriate for independent transmission planning organizations to take a more proactive role in drawing demand response alternatives into the resource mix. Existing demand response programs provide a technical basis to build from. Regulatory and market obstacles will have to be overcome if demand response alternatives are to be routinely considered in transmission expansion planning.

  18. PSTAR: Primary and secondary terms analysis and renormalization: A unified approach to building energy simulations and short-term monitoring

    SciTech Connect (OSTI)

    Subbarao, K.

    1988-09-01T23:59:59.000Z

    This report presents a unified method of hourly simulation of a building and analysis of performance data. The method is called Primary and Secondary Terms Analysis and Renormalization (PSTAR). In the PSTAR method, renormalized parameters are introduced for the primary terms such that the renormalized energy balance equation is best satisfied in the least squares sense, hence, the name PSTAR. PSTAR allows extraction of building characteristics from short-term tests on a small number of data channels. These can be used for long-term performance prediction (''ratings''), diagnostics, and control of heating, ventilating, and air conditioning systems (HVAC), comparison of design versus actual performance, etc. By combining realistic building models, simple test procedures, and analysis involving linear equations, PSTAR provides a powerful tool for analyzing building energy as well as testing and monitoring. It forms the basis for the Short-Term Energy Monitoring (STEM) project at SERI.

  19. Methodology for Analyzing Energy and Demand Savings From Energy Services Performance Contract Using Short-Term Data

    E-Print Network [OSTI]

    Liu, Z.; Haberl, J. S.; Cho, S.; Lynn, B.; Cook, M.

    2006-01-01T23:59:59.000Z

    . New methods, which were developed to measure hourly demand savings from short-term data, were also discussed. INTRODUCTION The Fort Hood Army Base has selected an Energy Services Performance Contract (ESPC) contractor to help achieve its... energy reduction goals as mandated by Executive Order. This ESPC is expected to be a $3.8 million, 20 year contract, which includes five primary types of Energy Conservation Measures (ECMs) in 58 buildings, including: boiler insulation, control...

  20. Short term effects of commercial polychlorinated biphenyl (PCB) mixtures and individual PCB congeners in female Sprague-Dawley rats

    E-Print Network [OSTI]

    Chen, Yu-Chyu

    1992-01-01T23:59:59.000Z

    fulfillment of the requirements for the degree of MASTER OF SCIENCE December 1992 Major subject: Toxicology SHORT TERM EFFECTS OF COMMERCIAL POLYCHLORINATED BIPHENYL (PCB) MIXTURES AND INDIVIDUAL PCB CONGENERS IN FEMALE SPRAGUE-DAWLEY RATS A Thesis... of isomers 3 12 24 42 46 42 24 12 3 1 209 This thesis followed the format and style of Toxicology and Applied Pharmacology. isomers and congeners in which there are differences with respect to the number of halogen atoms and their substitution...

  1. Integrating short-term demand response into long-term investment planning

    E-Print Network [OSTI]

    De Jonghe, Cedric; Hobbs, Benjamin F.; Belmans, Ronnie

    2011-03-20T23:59:59.000Z

    . In case of insufficient flexibility, wind power curtailment, also referred to as wasted wind [2], can help to instantaneously balance generation and demand when over- generation is a problem. As flexibility of conventional generation technologies... of load management is often facilitated by thermal storage applications for space cooling and heating applications. The final type of DSM program, flexible load shaping focuses on reliability. Programs allowing interruptible or curtailable load...

  2. Probabilistic wind power forecasting -European Wind Energy Conference -Milan, Italy, 7-10 May 2007 Probabilistic short-term wind power forecasting

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Probabilistic wind power forecasting - European Wind Energy Conference - Milan, Italy, 7-10 May 2007 Probabilistic short-term wind power forecasting based on kernel density estimators J´er´emie Juban jeremie.juban@ensmp.fr; georges.kariniotakis@ensmp.fr Abstract Short-term wind power forecasting tools

  3. System model Scope of Work Short term power constraint Long term power constraint Imperfect CSIR Prediction Summary Spatial and Temporal Power Allocation for MISO

    E-Print Network [OSTI]

    Bhashyam, Srikrishna

    System model Scope of Work Short term power constraint Long term power constraint Imperfect CSIR Prediction Summary Spatial and Temporal Power Allocation for MISO Systems with Delayed Feedback Srikrishna) feedback #12;System model Scope of Work Short term power constraint Long term power constraint Imperfect

  4. LONG-AND SHORT-TERM PRODUCTION SCHEDULING AT LKAB'S KIRUNA MINE

    E-Print Network [OSTI]

    Sweden. The iron ore mine currently uses a long-term production scheduling model to strategically plan the Arctic circle in northern Sweden, has been operational for more than a century. The mine currently

  5. Hawaii electric system reliability.

    SciTech Connect (OSTI)

    Silva Monroy, Cesar Augusto; Loose, Verne William

    2012-09-01T23:59:59.000Z

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability %E2%80%9Cworth%E2%80%9D and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

  6. Short-Term Load Forecasting Error Distributions and Implications for Renewable Integration Studies: Preprint

    SciTech Connect (OSTI)

    Hodge, B. M.; Lew, D.; Milligan, M.

    2013-01-01T23:59:59.000Z

    Load forecasting in the day-ahead timescale is a critical aspect of power system operations that is used in the unit commitment process. It is also an important factor in renewable energy integration studies, where the combination of load and wind or solar forecasting techniques create the net load uncertainty that must be managed by the economic dispatch process or with suitable reserves. An understanding of that load forecasting errors that may be expected in this process can lead to better decisions about the amount of reserves necessary to compensate errors. In this work, we performed a statistical analysis of the day-ahead (and two-day-ahead) load forecasting errors observed in two independent system operators for a one-year period. Comparisons were made with the normal distribution commonly assumed in power system operation simulations used for renewable power integration studies. Further analysis identified time periods when the load is more likely to be under- or overforecast.

  7. Hanford high level waste (HLW) tank mixer pump safe operating envelope reliability assessment

    SciTech Connect (OSTI)

    Fischer, S.R. [Los Alamos National Lab., NM (United States); Clark, J. [Science and Engineering Associates, Inc., Albuquerque, NM (United States)

    1993-10-01T23:59:59.000Z

    The US Department of Energy and its contractor, Westinghouse Corp., are responsible for the management and safe storage of waste accumulated from processing defense reactor irradiated fuels for plutonium recovery at the Hanford Site. These wastes, which consist of liquids and precipitated solids, are stored in underground storage tanks pending final disposition. Currently, 23 waste tanks have been placed on a safety watch list because of their potential for generating, storing, and periodically releasing various quantities of hydrogen and other gases. Tank 101-SY in the Hanford SY Tank Farm has been found to release hydrogen concentrations greater than the lower flammable limit (LFL) during periodic gas release events. In the unlikely event that an ignition source is present during a hydrogen release, a hydrogen burn could occur with a potential to release nuclear waste materials. To mitigate the periodic gas releases occurring from Tank 101-SY, a large mixer pump currently is being installed in the tank to promote a sustained release of hydrogen gas to the tank dome space. An extensive safety analysis (SA) effort was undertaken and documented to ensure the safe operation of the mixer pump after it is installed in Tank 101-SY.1 The SA identified a need for detailed operating, alarm, and abort limits to ensure that analyzed safety limits were not exceeded during pump operations.

  8. Short Term Hourly Load Forecasting Using Abductive Networks R. E. Abdel-Aal

    E-Print Network [OSTI]

    Abdel-Aal, Radwan E.

    Physical Sciences, Research Institute, King Fahd University of Petroleum and Minerals, Dhahran, Saudi for forecasting next-day hourly loads have been developed. Evaluated on data for the 6th year, the models give. INTRODUCTION Accurate load forecasting is a key requirement for the planning and economic and secure operation

  9. Short-term forecasting through intermittent assimilation of data from Taiwan and mainland China coastal radars

    E-Print Network [OSTI]

    Xue, Ming

    ; published 29 March 2012. [1] Radial velocity (Vr) and reflectivity (Z) data from eight coastal operational, but the benefit is mostly lost within the first hour of forecast. Assimilating data from a single Doppler radar with a good coverage of the typhoon inner core region is also quite effective, but it takes one more cycle

  10. Short-Term Energy Outlook Supplement: Status of Libyan Loading Ports and Oil and Natural Gas Fields

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctoberOutlookShort-Term

  11. Studies of asphalt air blowing and development of a new short-term aging technique 

    E-Print Network [OSTI]

    Vassiliev, Nicolai

    2001-01-01T23:59:59.000Z

    lower temperature variation in the oil bath and better film agitation in the flask. At 163 'C (325 'F) for a sample weight of 200 g it takes 160 minutes to achieve the aging effect closest to that of the TFOT and 210 minutes to compare... on the operating temperature and was less at higher temperatures. A total of 300 g of heated material was placed in a 1 qt (07946 Ll can and air-blown with constant agitation by a mixer attached to a motor at 1550 RPM. An insulated heating tape was used to heat...

  12. A Distributed Modeling System for Short-Term to Seasonal Ensemble Streamflow Forecasting in Snowmelt Dominated Basins

    SciTech Connect (OSTI)

    Wigmosta, Mark S.; Gill, Muhammad K.; Coleman, Andre M.; Prasad, Rajiv; Vail, Lance W.

    2007-12-01T23:59:59.000Z

    This paper describes a distributed modeling system for short-term to seasonal water supply forecasts with the ability to utilize remotely-sensed snow cover products and real-time streamflow measurements. Spatial variability in basin characteristics and meteorology is represented using a raster-based computational grid. Canopy interception, snow accumulation and melt, and simplified soil water movement are simulated in each computational unit. The model is run at a daily time step with surface runoff and subsurface flow aggregated at the basin scale. This approach allows the model to be updated with spatial snow cover and measured streamflow using an Ensemble Kalman-based data assimilation strategy that accounts for uncertainty in weather forecasts, model parameters, and observations used for updating. Model inflow forecasts for the Dworshak Reservoir in northern Idaho are compared to observations and to April-July volumetric forecasts issued by the Natural Resource Conservation Service (NRCS) for Water Years 2000 – 2006. October 1 volumetric forecasts are superior to those issued by the NRCS, while March 1 forecasts are comparable. The ensemble spread brackets the observed April-July volumetric inflows in all years. Short-term (one and three day) forecasts also show excellent agreement with observations.

  13. Short term Variability of the Sun Earth System: An Overview of Progress Made during the CAWSES II Period

    E-Print Network [OSTI]

    Gopalswamy, Nat; Yan, Yihua

    2015-01-01T23:59:59.000Z

    This paper presents an overview of results obtained during the CAWSES II period on the short term variability of the Sun and how it affects the near Earth space environment. CAWSES II was planned to examine the behavior of the solar terrestrial system as the solar activity climbed to its maximum phase in solar cycle 24. After a deep minimum following cycle 23, the Sun climbed to a very weak maximum in terms of the sunspot number in cycle 24 (MiniMax24), so many of the results presented here refer to this weak activity in comparison with cycle 23. The short term variability that has immediate consequence to Earth and geospace manifests as solar eruptions from closed field regions and high speed streams from coronal holes. Both electromagnetic (flares) and mass emissions (coronal mass ejections, CMEs) are involved in solar eruptions, while coronal holes result in high speed streams that collide with slow wind forming the so called corotating interaction regions (CIRs). Fast CMEs affect Earth via leading shocks ...

  14. Prediction of short-term and long-term VOC emissions from SBR bitumen-backed carpet under different temperatures

    SciTech Connect (OSTI)

    Yang, S.; Chen, Q. [Massachusetts Inst. of Tech., Cambridge, MA (United States). Building Technology Program; Bluyssen, P.M. [TNO Building and Construction Research, Delft (Netherlands)

    1998-12-31T23:59:59.000Z

    This paper presents two models for volatile organic compound (VOC) emissions from carpet. One is a numerical model using the computational fluid dynamics (CFD) technique for short-term predictions, the other an analytical model for long-term predictions. The numerical model can (1) deal with carpets that are not new, (2) calculate the time-dependent VOC distributions in a test chamber or room, and (3) consider the temperature effect on VOC emissions. Based on small-scale chamber data, both models were used to examine the VOC emissions under different temperatures from polypropene styrene-butadiene rubber (SBR) bitumen-backed carpet. The short-term predictions show that the VOC emissions under different temperatures can be modeled solely by changing the carpet diffusion coefficients. A formulation of the Arrhenius relation was used to correlate the dependence of carpet diffusion coefficient with temperature. The long-term predictions show that it would take several years to bake out the VOCs, and temperature would have a major impact on the bake-out time.

  15. An evaluation of the Gilian TRACEAIR Organic Vapor Monitoring Diffusive Badge in measuring short-term exposure levels of benzene under field conditions 

    E-Print Network [OSTI]

    Pierce, Mark Edward

    1996-01-01T23:59:59.000Z

    The objective of this research is to evaluate the performance of the Gilian TRACEAIR Organic Vapor Monitoring I (OVMI) Diffusive Badge in measuring short-term benzene exposures under field conditions. In general, a diffusive badge is a device which...

  16. Determining Long-Term Performance of Cool Storage Systems from Short-Term Tests; Literature Review and Site Selection, Nov. 1997 (Revised Feb. 1998)

    E-Print Network [OSTI]

    Haberl, J. S.; Claridge, D. E.; Reddy, T. A.; Elleson, J.

    1997-01-01T23:59:59.000Z

    This is the preliminary report contains the literature review and site selection recommendations for ASHRAE Research Project RP 1004 — "Determining Long-term Performance of Cool Storage Systems From Short-term Tests"....

  17. Experimental short-term climate forecasting procedure for US winter temperatures and its verification

    SciTech Connect (OSTI)

    Navato, A.R.

    1981-01-01T23:59:59.000Z

    A linear multivariate regression model for continental United States Januray surface air temperatures is presented. The predictors enter the regression equation at more than one lag if their effects on the predictand tend to be spread over several months rather than be completed in one month. The monthly mean surface tempertures for 12 cities were taken to be representative of temperatures for the regions around them. The predictand series then consisted of annual January values for each representative city. A separate regression equation was derived for the annual departures from the long term means for January for each city. The procedure therefore predicts the inter-annual variability for January. The regression equations for inter-annual variability were able to explain a much higher percentage of variance compared to the corresponding regression equations for monthly variability. The same procedure can be applied to obtain prediction equations for other months. The higher percentage is to be expected if it is considered that there must be differences in the operation of temperature-controlling physical mechanisms which are dependent on the march of the seasons.

  18. Visualization of short-term heart period variability with network tools as a method for quantifying autonomic drive

    E-Print Network [OSTI]

    Makowiec, Danuta; Kaczkowska, Agnieszka; Graff, Grzegorz; Wejer, Dorota; Wdowczyk, Joanna; Zarczynska-Buchowiecka, Marta; Gruchala, Marcin; Struzik, Zbigniew R

    2014-01-01T23:59:59.000Z

    Signals from heart transplant recipients can be considered to be a natural source of information for a better understanding of the impact of the autonomic nervous system on the complexity of heart rate variability. Beat-to-beat heart rate variability can be represented as a network of increments between subsequent $RR$-intervals, which makes possible the visualization of short-term heart period fluctuations. A network is constructed of vertices representing increments between subsequent $RR$-intervals, and edges which connect adjacent $RR$-increments. Two modes of visualization of such a network are proposed. The method described is applied to nocturnal Holter signals recorded from healthy young people and from cardiac transplant recipients. Additionally, the analysis is performed on surrogate data: shuffled RR-intervals (to display short-range dependence), and shuffled phases of the Fourier Transform of RR-intervals (to filter out linear dependences). Important nonlinear properties of autonomic nocturnal reg...

  19. Microstructural evolution of delta ferrite in SAVE12 steel under heat treatment and short-term creep

    SciTech Connect (OSTI)

    Li, Shengzhi, E-mail: lishengzhi@sjtu.edu.cn [School of Materials Science and Engineering, Shanghai Jiao Tong University, Shanghai 200240 (China)] [School of Materials Science and Engineering, Shanghai Jiao Tong University, Shanghai 200240 (China); Eliniyaz, Zumrat; Zhang, Lanting; Sun, Feng [School of Materials Science and Engineering, Shanghai Jiao Tong University, Shanghai 200240 (China)] [School of Materials Science and Engineering, Shanghai Jiao Tong University, Shanghai 200240 (China); Shen, Yinzhong [School of Nuclear Science and Engineering, Shanghai Jiao Tong University, Shanghai 200240 (China)] [School of Nuclear Science and Engineering, Shanghai Jiao Tong University, Shanghai 200240 (China); Shan, Aidang, E-mail: adshan@sjtu.edu.cn [School of Materials Science and Engineering, Shanghai Jiao Tong University, Shanghai 200240 (China)] [School of Materials Science and Engineering, Shanghai Jiao Tong University, Shanghai 200240 (China)

    2012-11-15T23:59:59.000Z

    This research focused on the formation and microstructural evolution of delta ferrite phase in SAVE12 steel. The formation of delta ferrite was due to the high content of ferrite forming alloy elements such as Cr, W, and Ta. This was interpreted through either JMatPro-4.1 computer program or Cr{sub eq} calculations. Delta ferrite was found in bamboo-like shape and contained large amount of MX phase. It was surrounded by Laves phases before creep or aging treatment. Annealing treatments were performed under temperatures from 1050 Degree-Sign C to 1100 Degree-Sign C and various time periods to study its dissolution kinetics. The result showed that most of the delta ferrite can be dissolved by annealing in single phase austenitic region. Dissolution process of delta ferrite may largely depend on dissolution kinetic factors, rather than on thermodynamic factors. Precipitation behavior during short-term (1100 h) creep was investigated at temperature of 600 Degree-Sign C under a stress of 180 MPa. The results demonstrated that delta ferrite became preferential nucleation sites for Laves phase at the early stage of creep. Laves phase on the boundary around delta ferrite showed relatively slower growth and coarsening rate than that inside delta ferrite. - Highlights: Black-Right-Pointing-Pointer Delta ferrite is systematically studied under heat treatment and short-term creep. Black-Right-Pointing-Pointer Delta ferrite contains large number of MX phase and is surrounded by Laves phases before creep or aging treatment. Black-Right-Pointing-Pointer Formation of delta ferrite is interpreted by theoretical and empirical methods. Black-Right-Pointing-Pointer Most of the delta ferrite is dissolved by annealing in single phase austenitic region. Black-Right-Pointing-Pointer Delta ferrite becomes preferential nucleation sites for Laves phase at the early stage of creep.

  20. Ichno-sedimentological record of short-term climate-controlled redox events and cycles in organic-rich strata

    SciTech Connect (OSTI)

    Savrda, C.E. (Auburn Univ., AL (USA)); Bottjher, D.J. (Univ. of Southern California, Los Angeles (USA)); Ozalas, K. (Auburn Univ., AL (USA))

    1990-05-01T23:59:59.000Z

    Reduced rates of biochemical degradation of organic matter in oxygen-depleted marine settings generally result in the accumulation of laminated strata with high hydrocarbon source potential. Periods of improved oxygenation, during which the quantity and quality of organic matter are effectively reduced, are reflected by interbedded bioturbated intervals. Such benthic redox excursions may reflect variable paleooceanographic responses to climatic events or cycles. The potential role of climate in the short-term modulation of source rock potential is exemplified by bioturbated intervals within three predominantly laminated organic-rich units. The Jurassic Posidonia Shale (Germany) contains bioturbated beds whose ichnologic characteristics reflect a spectrum from short, low-magnitude redox events to longer episodes of greater magnitude. The character and distribution of these event beds appear to be controlled by sea level mediated variations in the frequency and intensity of storm-induced basin turnover. Bioturbated beds of the Upper Cretaceous Niobrara Formation (Colorado) are characterized by four oxygen-related ichnocoenoses, the distribution of which reflects cyclic variations in redox conditions. Relationships between paleooxygenation and organic-carbon and carbonate contents, and estimated cycle periodicities, suggest that redox variations were controlled by wet-dry climatic cycles modulated by the Milankovitch cycle of axial precession. Bioturbated beds within slope and basinal facies of the Miocene Monterey Formation (California) are variable in character, reflecting differences in duration and magnitude of associated oxygenation episodes, and may be in response to short-term variations in wind-stress-induced upwelling and/or ice-volume-controlled eustatic sea level changes.

  1. Effects of various uranium leaching procedures on soil: Short-term vegetation growth and physiology. Progress report, April 1994

    SciTech Connect (OSTI)

    Edwards, N.T.

    1994-08-01T23:59:59.000Z

    Significant volumes of soil containing elevated levels of uranium exist in the eastern United States. The contamination resulted from the development of the nuclear industry in the United States requiring a large variety of uranium products. The contaminated soil poses a collection and disposal problem of a magnitude that justifies the development of decontamination methods. Consequently, the Department of Energy (DOE) Office of Technology Development formed the Uranium Soils Integrated Demonstration (USID) program to address the problem. The fundamental goal of the USID task group has been the selective extraction/leaching or removal of uranium from soil faster, cheaper, and safer than what can be done using current conventional technologies. The objective is to selectively remove uranium from soil without seriously degrading the soil`s physicochemical characteristics and without generating waste that is difficult to manage and/or dispose of. However, procedures developed for removing uranium from contaminated soil have involved harsh chemical treatments that affect the physicochemical properties of the soil. The questions are (1) are the changes in soil properties severe enough to destroy the soil`s capacity to support and sustain vegetation growth and survival? and (2) what amendments might be made to the leached soil to return it to a reasonable vegetation production capacity? This study examines the vegetation-support capacity of soil that had been chemically leached to remove uranium. The approach is to conduct short-term germination and phytotoxicity tests for evaluating soils after they are subjected to various leaching procedures followed by longer term pot studies on successfully leached soils that show the greatest capacity to support plant growth. This report details the results from germination and short-term phytotoxicity testing of soils that underwent a variety of leaching procedures at the bench scale at ORNL and at the pilot plant at Fernald.

  2. Instrumentation Report No. 3: performance and reliability of instrumentation deployed for the Spent Fuel Test - Climax

    SciTech Connect (OSTI)

    Patrick, W.C.; Rector, N.L.; Scarafiotti, J.J.

    1984-12-01T23:59:59.000Z

    A demonstration of the short-term storage and subsequent retrieval of spent nuclear fuel assemblies was successfully completed at the US Department of Energy`s Nevada Test Site. Nearly 1000 instruments were deployed to monitor the temperature of rock, air, and metallic components of the test; displacements and stress changes within the rock mass; radiation dosage to personnel and to the rock; thermal energy input; characteristics of the ventilation airstream; and the operational status of the test. Careful selection, installation, calibration, and maintenance of these instruments ensured the acquisition of about 15.3 x 10{sup 6} high-quality data points. With few exceptions, the performance and reliability of the instrumentation and associated data acquisition system (DAS) were within specified acceptable limits. Details of the performance and reliability of the instrumentation are discussed in this report. 42 figs., 32 tabs.

  3. Packaging effects: operating frequency, power, complexity, reliability, and cost The packaging challenge is too keep up with the demands of forecasted silicon

    E-Print Network [OSTI]

    Patel, Chintan

    Packaging effects: operating frequency, power, complexity, reliability, and cost The packaging challenge is too keep up with the demands of forecasted silicon technology and forecasted cost targets. Low performance (servers, avionics, supercomputers) Harsh (under the hood and hostile environments) #12;power

  4. Seismic Activity of the Earth, the Cosmological Vectorial Potential And Method of a Short-term Earthquakes Forecasting

    E-Print Network [OSTI]

    Yu. A. Baurov; Yu. A. Baurov; Yu. A. Baurov Jr.; A. A. Spitalnaya; A. A. Abramyan; V. A. Solodovnikov

    2008-08-20T23:59:59.000Z

    To the foundation of a principally new short-term forecasting method there has been laid down a theory of surrounding us world's creation and of physical vacuum as a result of interaction of byuons - discrete objects. The definition of the byuon contains the cosmological vector-potential A_g - a novel fundamental vector constant. This theory predicts a new anisotropic interaction of nature objects with the physical vacuum. A peculiar "tap" to gain new energy (giving rise to an earthquake) are elementary particles because their masses are proportional to the modulus of some summary potential A_sum that contains potentials of all known fields. The value of A_sum cannot be larger than the modulus of A_g. In accordance with the experimental results a new force associated with A_sum ejects substance from the area of the weakened A_sum along a conical formation with the opening of 100 +- 10 and the axis directed along the vector A_sum. This vector has the following coordinates in the second equatorial coordinate system: right ascension alpha = 293 +- 10, declination delta = 36 +- 10. Nearly 100% probability of an earthquake (earthquakes of 6 points strong and more by the Richter scale) arises when in the process of the earth rotation the zenith vector of a seismically dangerous region and/or the vectorial potential of Earth's magnetic fields are in a certain way oriented relative to the vector A_g. In the work, basic models and standard mechanisms of earthquakes are briefly considered, results of processing of information on the earthquakes in the context of global spatial anisotropy caused by the existence of the vector A_g, are presented, and an analysis of them is given.

  5. European Wind Energy Conference & Exhibition EWEC 2003, Madrid, Spain. State-of-the-Art on Methods and Software Tools for Short-Term

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    European Wind Energy Conference & Exhibition EWEC 2003, Madrid, Spain. State-of-the-Art on Methods and Software Tools for Short-Term Prediction of Wind Energy Production G. Giebel*, L. Landberg, Risoe National Roskilde, Denmark Abstract: The installed wind energy capacity in Europe today is 20 GW, while

  6. Oxygen isotope content of CO2 in nocturnal ecosystem respiration: 2. Short-term dynamics of foliar and soil component fluxes in an

    E-Print Network [OSTI]

    Ehleringer, Jim

    Oxygen isotope content of CO2 in nocturnal ecosystem respiration: 2. Short-term dynamics of foliar; accepted 29 October 2003; published 23 December 2003. [1] The oxygen isotope contents (d18 O) of soil showed enrichment over a 2-week sampling period as the weather became hot and dry (leaves 0.9 to 15

  7. A Methodology to Characterize Ideal Short-term Counting Conditions and Improve AADT Estimation Accuracy Using a Regression-based Correcting

    E-Print Network [OSTI]

    Bertini, Robert L.

    -established and robust with clear guidelines to collect short-term count data, to analyze data and develop annual average a statewide system of non-motorized data. From a planning point of view, a key measure of traffic volumes continuous counts comes from the AASHTO Guidelines for Traffic Data Programs, prepared in 1992 (AASHTO, 1992

  8. Prediction of wind speed profiles for short-term forecasting in the offshore environment R.J. Barthelmie and G. Giebel

    E-Print Network [OSTI]

    in planning of maintenance visits to offshore wind farms. In most cases the basis for the predictionPrediction of wind speed profiles for short-term forecasting in the offshore environment R wind farms. The main effects considered here are: wind speed gradients in the coastal zone, vertical

  9. Determining Long-Term Performance of Cool Storage Systems from Short-Term Tests, Progress Report, 6-99, Revised 12-99

    E-Print Network [OSTI]

    Reddy, T. A.; Elleson, J.; Haberl, J. S.

    1999-01-01T23:59:59.000Z

    This is the Spring 1999 progress report on ASHRAE Research Project RP 1004: Determining Long-Term Performance of Cool Storage Systems from Short-Term Tests. This report presents an update concerning the work that has been accomplished since the June...

  10. Estimation of original gas in place from short-term shut-in pressure data for commingled tight gas reservoirs with no crossflow 

    E-Print Network [OSTI]

    Khuong, Chan Hung

    1995-01-01T23:59:59.000Z

    gas production (GP) under these circumstances. This research studies different empirical methods to estimate the original gas in place (OGIP) for one-layer or commingled two-layer tight gas reservoirs without crossflow, from short-term (72-hour) shut...

  11. Short-term variability of suspended sediment and phytoplankton in Tampa Bay, Florida: Observations from a coastal oceanographic tower

    E-Print Network [OSTI]

    Meyers, Steven D.

    dynamics in Tampa Bay with data collected between 8 December 2004 and 17 January 2005 from optical of reliable and cost-effective means for high-frequency sampling (e.g., Roegner et al., 2002). As a result, with a dredged channel (>10 m) extending from the mouth of the bay to the upper bay. Tampa Bay is often divided

  12. The effect of short-term soy isoflavone supplementation on mRNA in localized prostate cancer

    E-Print Network [OSTI]

    Rubin, Jessica D.

    2013-08-31T23:59:59.000Z

    matters as the reliability of data can be compromised by the source (e.g. cell lines or human tissue) and quality of mRNA (17,18). Although “omics” research continues to... steamed, roasted, or processed into different soy-­?based products, ranging from more traditional soy foods (e.g. tofu, miso, tempeh, and soy milk) to “second generation” soy...

  13. Multi-color Near Infra-red Intra-day and Short Term Variability of the Blazar S5 0716+714

    E-Print Network [OSTI]

    Alok C. Gupta; Sang-Mok Cha; Sungho Lee; Ho Jin; Soojong Pak; Seoung-hyun Cho; Bongkon Moon; Youngsik Park; In-Soo Yuk; Uk-won Nam; Jaemann Kyeong

    2008-09-19T23:59:59.000Z

    In this paper, we report results of our near-infrared (NIR) photometric variability studies of the BL Lacertae object S5 0716+714. NIR photometric observations spread over 7 nights during our observing run April 2-9, 2007 at 1.8 meter telescope equipped with KASINICS (Korea Astronomy and Space Science Institute Near Infrared Camera System) and J, H, and Ks filters at Bohyunsan Optical Astronomy Observatory (BOAO), South Korea. We searched for intra-day variability, short term variability and color variability in the BL Lac object. We have not detected any genuine intra-day variability in any of J, H, and Ks passbands in our observing run. Significant short term variability ~ 32.6%, 20.5% and 18.2% have been detected in J, H, Ks passbands, respectively, and ~ 11.9% in (J-H) color.

  14. arXiv:1007.3122v2[q-bio.NC]30Jan2013 Robust Short-Term Memory without Synaptic

    E-Print Network [OSTI]

    Johnson, Samuel

    been stored in samuel.johnson@imperial.ac.uk 1 #12;our brains previously (not very credible). Here wearXiv:1007.3122v2[q-bio.NC]30Jan2013 Robust Short-Term Memory without Synaptic Learning Samuel Johnson1,2, , J. Marro3 , and Joaqu´in J. Torres3 1 Department of Mathematics, Imperial College London, SW

  15. An assay of duck hepatitis virus induced interferon, produced in duck embryo fibro-blasts which have experienced short term treatment with DDT

    E-Print Network [OSTI]

    Bauder, Richard Burgess

    1973-01-01T23:59:59.000Z

    AN ASSAY OP DUCK HEPATITIS VIRUS INDUCED INTERFERON, PRODUCED IN DUCK EMBRYO FIBROBLASTS WHICH HAVE EXPERIENCED SHORT TERM TREATMENT WITH DDT A Thesis by BURGESS BAUDER Submitted to the Graduate College of Texas A&M University in Partial... WITH DDT A Thesi. s by /'. ". " . "i BURGESS BAUDER Approved as to style and content by: (Chairm of Committee) (Head of Depar ent) (Member) (Member) (Member) August 1973 ABSTRACT An Assay of Duck Hepatitis Virus Induced Interferon, Produced...

  16. PSTAR: Primary and secondary terms analysis and renormalization: A unified approach to building energy simulations and short-term monitoring: A summary

    SciTech Connect (OSTI)

    Subbarao, K.

    1988-09-01T23:59:59.000Z

    This report summarizes a longer report entitled PSTAR - Primary and Secondary Terms Analysis and Renormalization. A Unified Approach to Building Energy Simulations and Short-Term Monitoring. These reports highlight short-term testing for predicting long-term performance of residential buildings. In the PSTAR method, renormalized parameters are introduced for the primary terms such that the renormalized energy balance equation is best satisfied in the least squares sense; hence, the name PSTAR. Testing and monitoring the energy performance of buildings has several important applications, among them: extrapolation to long-term performance, refinement of design tools through feedback from comparing design versus actual parameters, building-as-a-calorimeter for heating, ventilating, and air conditioning (HVAC) diagnostics, and predictive load control. By combining realistic building models, simple test procedures, and analysis involving linear equations, PSTAR provides a powerful tool for analyzing building energy as well as testing and monitoring. It forms the basis for the Short-Term Energy Monitoring (STEM) project at SERI. 3 figs., 1 tab.

  17. Design modification for the modular helium reactor for higher temperature operation and reliability studies for nuclear hydrogen production processes

    E-Print Network [OSTI]

    Reza, S.M. Mohsin

    2009-05-15T23:59:59.000Z

    Design options have been evaluated for the Modular Helium Reactor (MHR) for higher temperature operation. An alternative configuration for the MHR coolant inlet flow path is developed to reduce the peak vessel temperature (PVT). The coolant inlet...

  18. Use of Frequency Response Metrics to Assess the Planning and Operating Requirements for Reliable Integration of Variable Renewable Generation

    E-Print Network [OSTI]

    Eto, Joseph H.

    2011-01-01T23:59:59.000Z

    electricity (e.g. , steam turbines, combustion turbines,all be used to run a steam turbine). See Undrill (2010) forcycle plants whose steam turbines are operated with their

  19. Operating experience feedback report: Reliability of safety-related steam turbine-driven standby pumps. Commercial power reactors, Volume 10

    SciTech Connect (OSTI)

    Boardman, J.R.

    1994-10-01T23:59:59.000Z

    This report documents a detailed analysis of failure initiators, causes and design features for steam turbine assemblies (turbines with their related components, such as governors and valves) which are used as drivers for standby pumps in the auxiliary feedwater systems of US commercial pressurized water reactor plants, and in the high pressure coolant injection and reactor core isolation cooling systems of US commercial boiling water reactor plants. These standby pumps provide a redundant source of water to remove reactor core heat as specified in individual plant safety analysis reports. The period of review for this report was from January 1974 through December 1990 for licensee event reports (LERS) and January 1985 through December 1990 for Nuclear Plant Reliability Data System (NPRDS) failure data. This study confirmed the continuing validity of conclusions of earlier studies by the US Nuclear Regulatory Commission and by the US nuclear industry that the most significant factors in failures of turbine-driven standby pumps have been the failures of the turbine-drivers and their controls. Inadequate maintenance and the use of inappropriate vendor technical information were identified as significant factors which caused recurring failures.

  20. Improved water allocation utilizing probabilistic climate forecasts: Short-term water contracts in a risk management framework

    E-Print Network [OSTI]

    Arumugam, Sankar

    . Thus, integrated supply and demand management can be achieved. In this paper, a single period multiuser, forecast consumers, water managers and reservoir operators, have difficulty interpreting such products in a risk management framework A. Sankarasubramanian,1 Upmanu Lall,2 Francisco Assis Souza Filho,3

  1. Cloud tracking with optical flow for short-term solar forecasting Philip Wood-Bradley, Jos Zapata, John Pye

    E-Print Network [OSTI]

    , photovoltaic systems, and grid regulation (Mathiesen & Kleissl, 2011; Martínez López, et al, 2002). A method apart with a size of 640 by 480 pixels, were processed to determine the time taken for clouds to reach irradiance is essential for the effective operation of many solar applications such as solar thermal systems

  2. Environmental Regulations and Changes in Petroleum Refining Operations (Released in the STEO June 1998)

    Reports and Publications (EIA)

    1998-01-01T23:59:59.000Z

    Changes in domestic refining operations are identified and related to the summer Reid vapor pressure (RVP) restrictions and oxygenate blending requirements. This analysis uses published Energy Information Administration survey data and linear regression equations from the Short-Term Integrated Forecasting System (STIFS). The STIFS model is used for producing forecasts appearing in the Short-Term Energy Outlook.

  3. Reliability Standards Owner

    Broader source: Energy.gov [DOE]

    This position is located in the Internal Operations and Asset Management group of Planning and Asset Management (TP). A successful candidate in this position will serve as the Reliability Standards...

  4. Unmanned Aerial Vehicle (UAV) Dynamic-Tracking Directional Wireless Antennas for Low Powered Applications that Require Reliable Extended Range Operations in Time Critical Scenarios

    SciTech Connect (OSTI)

    Scott G. Bauer; Matthew O. Anderson; James R. Hanneman

    2005-10-01T23:59:59.000Z

    The proven value of DOD Unmanned Aerial Vehicles (UAVs) will ultimately transition to National and Homeland Security missions that require real-time aerial surveillance, situation awareness, force protection, and sensor placement. Public services first responders who routinely risk personal safety to assess and report a situation for emergency actions will likely be the first to benefit from these new unmanned technologies. ‘Packable’ or ‘Portable’ small class UAVs will be particularly useful to the first responder. They require the least amount of training, no fixed infrastructure, and are capable of being launched and recovered from the point of emergency. All UAVs require wireless communication technologies for real- time applications. Typically on a small UAV, a low bandwidth telemetry link is required for command and control (C2), and systems health monitoring. If the UAV is equipped with a real-time Electro-Optical or Infrared (EO/Ir) video camera payload, a dedicated high bandwidth analog/digital link is usually required for reliable high-resolution imagery. In most cases, both the wireless telemetry and real-time video links will be integrated into the UAV with unity gain omni-directional antennas. With limited on-board power and payload capacity, a small UAV will be limited with the amount of radio-frequency (RF) energy it transmits to the users. Therefore, ‘packable’ and ‘portable’ UAVs will have limited useful operational ranges for first responders. This paper will discuss the limitations of small UAV wireless communications. The discussion will present an approach of utilizing a dynamic ground based real-time tracking high gain directional antenna to provide extend range stand-off operation, potential RF channel reuse, and assured telemetry and data communications from low-powered UAV deployed wireless assets.

  5. ANNOUNCEMENT Short-Term Course

    E-Print Network [OSTI]

    Srivastava, Kumar Vaibhav

    to reduction in underground-based carbon resources. This has propelled the development of advanced engine-treatment such as selective catalyst reduction and NOx storage catalysts · Oxidation catalysts for VOC, and hydrocarbon-2). There will be a book exhibition on one evening. The first day of the course i.e. 28th June will be for the field visit

  6. ANNOUNCEMENT Short-Term Course

    E-Print Network [OSTI]

    Srivastava, Kumar Vaibhav

    to reduction in underground-based carbon resources. This has propelled the development of advanced engine traps · Selective catalytic reduction technique · NOx storage catalysts · engine system strategies will be for the field visit to Engine Development Directorate, RDSO Lucknow, Ministry of Railways (Not compulsory

  7. ANNOUNCEMENT Short-Term Course

    E-Print Network [OSTI]

    Srivastava, Kumar Vaibhav

    to reduction in underground- based carbon resources. This has propelled the development of advanced engine traps · Selective catalytic reduction technique · NOx storage catalysts · engine system strategies will be for the field visit to Engine Development Directorate, RDSO Lucknow, Ministry of Railways (Not compulsory

  8. Short-Term Energy Outlook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del Sol HomeFacebookScholarship Fund scholarshipsShedding LightShinyShorei

  9. Short-Term Energy Outlook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del Sol HomeFacebookScholarship Fund scholarshipsShedding LightShinyShorei

  10. Short-Term Energy Outlook

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTownDells,1Stocks Nov-14 Dec-14Table 4.April19.Data Series: Proved Reserves

  11. Short-Term Energy Outlook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002 13 13 13

  12. Short-Term Energy Outlook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002 13 13 133 1

  13. Short-Term Energy Outlook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002 13 13

  14. Short-Term Energy Outlook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002 13 13(STEO)

  15. Short-Term Energy Outlook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002 13

  16. Short-Term Energy Outlook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002 13 1 December

  17. Short-Term Energy Outlook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002 13 1

  18. Short-Term Energy Outlook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002 13 1(STEO)

  19. Short-Term Energy Outlook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002 13

  20. Short-Term Energy Outlook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002 13June 2014 1

  1. Short-Term Energy Outlook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002 13June 2014

  2. Short-Term Energy Outlook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002 13June 2014

  3. Short-Term Energy Outlook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002 13June

  4. Short-Term Energy Outlook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002 13June(STEO)

  5. Short-Term Energy Outlook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002 13June(STEO)4

  6. Short-Term Energy Outlook

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto17 3400, U.S. DEPARTMENT OF ENERGY OMB No.Despite dropnatural

  7. Dose-Escalated Radiotherapy for High-Risk Prostate Cancer: Outcomes in Modern Era With Short-Term Androgen Deprivation Therapy

    SciTech Connect (OSTI)

    Liauw, Stanley L., E-mail: sliauw@radonc.uchicago.ed [Department of Radiation and Cellular Oncology, University of Chicago Pritzker School of Medicine, Chicago, IL (United States); Stadler, Walter M. [Department of Medical Oncology, University of Chicago Pritzker School of Medicine, Chicago, IL (United States); Correa, David B.S.; Weichselbaum, Ralph R. [Department of Radiation and Cellular Oncology, University of Chicago Pritzker School of Medicine, Chicago, IL (United States); Jani, Ashesh B. [Department of Radiation Oncology, Emory University, Atlanta, GA (United States)

    2010-05-01T23:59:59.000Z

    Purpose: Randomized data have supported the use of long-term androgen deprivation therapy (ADT) combined with radiotherapy (RT) for men with high-risk prostate cancer. The present study reviewed the outcomes of intermediate- and high-risk men treated with RT and short-term ADT. Materials and Methods: A total of 184 men with any single risk factor of prostate-specific antigen >=10 ng/mL, clinical Stage T2b or greater, or Gleason score >=7 were treated with primary external beam RT for nonmetastatic adenocarcinoma of the prostate. The median radiation dose was 74 Gy; 55% were treated with intensity-modulated RT. All patients received ADT for 1 to 6 months (median, 4), consisting of a gonadotropin-releasing hormone analog. Univariate and multivariable analyses were performed for risk factors, including T stage, Gleason score, radiation dose, and prostate-specific antigen level. Results: With a median follow-up of 51 months, the 4-year freedom from biochemical failure (FFBF) using the nadir plus 2 ng/mL definition was 83% for all patients. Clinical Stage T3 disease was the only variable tested associated with FFBF on univariate (4-year FFBF rate, 46% vs. 87% for Stage T1-T2c disease; p = .0303) and multivariable analysis (hazard ratio, 3.9; p = .0016). On a subset analysis of high-risk patients (National Comprehensive Cancer Network criteria), those with clinical Stage T3 disease (4-year FFBF rate, 46% vs. 80%; p = .0303) and a radiation dose <74 Gy (4-year FFBF rate, 64% vs. 80%) had a poorer outcome on univariate analysis. However, clinical Stage T3 disease and radiation dose were not significant on multivariable analysis, although a statistical multivariable trend was seen for both (p = .0650 and p = .0597, respectively). Conclusion: Short-term ADT and RT might be acceptable for men with intermediate- and high-risk prostate cancer, especially for clinically localized disease treated with doses of >=74 Gy.

  8. Effect of short-term exposure to dichlorvos on synaptic plasticity of rat hippocampal slices: Involvement of acylpeptide hydrolase and {alpha}{sub 7} nicotinic receptors

    SciTech Connect (OSTI)

    Olmos, Cristina; Sandoval, Rodrigo [Laboratory of Environmental Neurotoxicology, Department of Biomedical Sciences, Faculty of Medicine, Universidad Catolica del Norte, Larrondo 1281, 178-1421 Coquimbo (Chile); Rozas, Carlos [Laboratory of Neurosciences, Department of Biology, Faculty of Chemistry and Biology, Universidad de Santiago de Chile, Alameda 3363, Santiago (Chile); Navarro, Sebastian [Laboratory of Environmental Neurotoxicology, Department of Biomedical Sciences, Faculty of Medicine, Universidad Catolica del Norte, Larrondo 1281, 178-1421 Coquimbo (Chile); Wyneken, Ursula [Laboratory of Neurosciences, Faculty of Medicine, Universidad de Los Andes, San Carlos de Apoquindo 2200, Santiago (Chile); Zeise, Marc [School of Psychology, Faculty of Humanities, University of Santiago de Chile, Alameda 3363, Santiago (Chile); Morales, Bernardo [Laboratory of Neurosciences, Department of Biology, Faculty of Chemistry and Biology, Universidad de Santiago de Chile, Alameda 3363, Santiago (Chile); Pancetti, Floria [Laboratory of Environmental Neurotoxicology, Department of Biomedical Sciences, Faculty of Medicine, Universidad Catolica del Norte, Larrondo 1281, 178-1421 Coquimbo (Chile)], E-mail: pancetti@ucn.cl

    2009-07-01T23:59:59.000Z

    Dichlorvos is the active molecule of the pro-drug metrifonate used to revert the cognitive deficits associated with Alzheimer's disease. A few years ago it was reported that dichlorvos inhibits the enzyme acylpeptide hydrolase at lower doses than those necessary to inhibit acetylcholinesterase to the same extent. Therefore, the aim of our investigation was to test the hypothesis that dichlorvos can enhance synaptic efficacy through a mechanism that involves acylpeptide hydrolase instead of acetylcholinesterase inhibition. We used long-term potentiation induced in rat hippocampal slices as a model of synaptic plasticity. Our results indicate that short-term exposures (20 min) to 50 {mu}M dichlorvos enhance long-term potentiation in about 200% compared to the control condition. This effect is correlated with approximately 60% inhibition of acylpeptide hydrolase activity, whereas acetylcholinesterase activity remains unaffected. Paired-pulse facilitation and inhibition experiments indicate that dichlorvos does not have any presynaptic effect in the CA3 {yields} CA1 pathway nor affect gabaergic interneurons. Interestingly, the application of 100 nM methyllicaconitine, an {alpha}{sub 7} nicotinic receptor antagonist, blocked the enhancing effect of dichlorvos on long-term potentiation. These results indicate that under the exposure conditions described above, dichlorvos enhances long-term potentiation through a postsynaptic mechanism that involves (a) the inhibition of the enzyme acylpeptide hydrolase and (b) the modulation of {alpha}{sub 7} nicotinic receptors.

  9. Operating experience feedback report-reliability of safety-related steam turbine-driven standby pumps used in US commerical nuclear power plants

    SciTech Connect (OSTI)

    Boardman, J.R. [Nuclear Regulatory Commission, Washington, DC (United States)

    1995-01-01T23:59:59.000Z

    Pump failure experience is collected by two primary means: (1) Licensee Event Reports, and (2) Nuclear Plant Reliability Data System failure reports. Certain safety-related turbine-driven standby pumps were identified by these data systems as experiencing significant ongoing repetitive failures of their turbine drivers, resulting in low reliability of the pump units. The root causes of identified failures were determined, and actions to preclude these repetitive failures were identified. 5 refs., 1 tab.

  10. INFRARED OBSERVATIONS OF THE MILLISECOND PULSAR BINARY J1023+0038: EVIDENCE FOR THE SHORT-TERM NATURE OF ITS INTERACTING PHASE IN 2000-2001

    SciTech Connect (OSTI)

    Wang, Xuebing; Wang, Zhongxiang [Key Laboratory for Research in Galaxies and Cosmology, Shanghai Astronomical Observatory, Chinese Academy of Sciences, 80 Nandan Road, Shanghai 200030 (China)] [Key Laboratory for Research in Galaxies and Cosmology, Shanghai Astronomical Observatory, Chinese Academy of Sciences, 80 Nandan Road, Shanghai 200030 (China); Morrell, Nidia [Las Campanas Observatory, Observatories of the Carnegie Institution of Washington, La Serena (Chile)] [Las Campanas Observatory, Observatories of the Carnegie Institution of Washington, La Serena (Chile)

    2013-02-20T23:59:59.000Z

    We report our multi-band infrared (IR) imaging of the transitional millisecond pulsar system J1023+0038, a rare pulsar binary known to have an accretion disk in 2000-2001. The observations were carried out with ground-based and space telescopes from near-IR to far-IR wavelengths. We detected the source in near-IR JH bands and Spitzer 3.6 and 4.5 {mu}m mid-IR channels. Combined with the previously reported optical spectrum of the source, the IR emission is found to arise from the companion star, with no excess emission detected in the wavelength range. Because our near-IR fluxes are nearly equal to those obtained by the 2MASS all-sky survey in 2000 February, the result indicates that the binary did not contain the accretion disk at the time, whose existence would have raised the near-IR fluxes to twice larger values. Our observations have thus established the short-term nature of the interacting phase seen in 2000-2001: the accretion disk existed for at most 2.5 yr. The binary was not detected by the WISE all-sky survey carried out in 2010 at its 12 and 22 {mu}m bands and our Herschel far-IR imaging at 70 and 160 {mu}m. Depending on the assumed properties of the dust, the resulting flux upper limits provide a constraint of <3 Multiplication-Sign 10{sup 22}-3 Multiplication-Sign 10{sup 25} g on the mass of the dust grains that possibly exist as the remnants of the previously seen accretion disk.

  11. Comparison of MELCOR modeling techniques and effects of vessel water injection on a low-pressure, short-term, station blackout at the Grand Gulf Nuclear Station

    SciTech Connect (OSTI)

    Carbajo, J.J.

    1995-06-01T23:59:59.000Z

    A fully qualified, best-estimate MELCOR deck has been prepared for the Grand Gulf Nuclear Station and has been run using MELCOR 1.8.3 (1.8 PN) for a low-pressure, short-term, station blackout severe accident. The same severe accident sequence has been run with the same MELCOR version for the same plant using the deck prepared during the NUREG-1150 study. A third run was also completed with the best-estimate deck but without the Lower Plenum Debris Bed (BH) Package to model the lower plenum. The results from the three runs have been compared, and substantial differences have been found. The timing of important events is shorter, and the calculated source terms are in most cases larger for the NUREG-1150 deck results. However, some of the source terms calculated by the NUREG-1150 deck are not conservative when compared to the best-estimate deck results. These results identified some deficiencies in the NUREG-1150 model of the Grand Gulf Nuclear Station. Injection recovery sequences have also been simulated by injecting water into the vessel after core relocation started. This marks the first use of the new BH Package of MELCOR to investigate the effects of water addition to a lower plenum debris bed. The calculated results indicate that vessel failure can be prevented by injecting water at a sufficiently early stage. No pressure spikes in the vessel were predicted during the water injection. The MELCOR code has proven to be a useful tool for severe accident management strategies.

  12. North American Electric Reliability Corporation (NERC): Reliability...

    Office of Environmental Management (EM)

    (NERC): Reliability Considerations from the Integration of Smart Grid North American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of...

  13. Electricity Reliability

    E-Print Network [OSTI]

    electric power equipment with more energy efficiency and higher capacity than today's systems of modernizing the electric grid to meet the nations's need for reliable, electric power, enhancing security continues to increase within the electricity infrastructure. DOE is conducting research, development

  14. > REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 An Analytical Framework for Short-Term Resource

    E-Print Network [OSTI]

    the aggregate customer demand [1]. Resource adequacy addresses the need to have "sufficient" resources in place characteristics of electricity, including the lack of large-scale storage and the limited demand responsiveness world by representing the contribution of the resources and the load demand to reliability

  15. Human-reliability data bank for nuclear-power-plant operations. Volume 2. A data-bank concept and system description

    SciTech Connect (OSTI)

    Comer, M.K.; Kozinsky, E.J.; Eckel, J.S.; Miller, D.P.

    1983-02-01T23:59:59.000Z

    The US Nuclear Regulatory Commission (NRC) is conducting a research program to determine the need for a human-reliability data bank unique to the nuclear industry. This report, in describing a proposed data bank, focuses primarily on four requirements: human-performance data collection, treatment, structuring (storage), and retrieval. Four data-collection methods are proposed: three are extensions to existing systems (i.e., Licensee Event Reports (LER), Nuclear Plant Reliability Data System (NPRDS), and Plant Incident Reports (PIR)); the fourth is a new system called the Nuclear Safety Reporting System (NSRS). Data treatment involves evaluating raw field data and data from other sources (e.g., training simulator, expert judgment, and performance modeling), and preparing them for entry into the data bank. Data structuring involves storage of data by equipment characteristics and human actions at the system, component, and individual control/display levels. Data retrieval uses a set of matrices based on the data-structuring taxonomy.

  16. Power electronics reliability.

    SciTech Connect (OSTI)

    Kaplar, Robert James; Brock, Reinhard C.; Marinella, Matthew; King, Michael Patrick; Stanley, James K.; Smith, Mark A.; Atcitty, Stanley

    2010-10-01T23:59:59.000Z

    The project's goals are: (1) use experiments and modeling to investigate and characterize stress-related failure modes of post-silicon power electronic (PE) devices such as silicon carbide (SiC) and gallium nitride (GaN) switches; and (2) seek opportunities for condition monitoring (CM) and prognostics and health management (PHM) to further enhance the reliability of power electronics devices and equipment. CM - detect anomalies and diagnose problems that require maintenance. PHM - track damage growth, predict time to failure, and manage subsequent maintenance and operations in such a way to optimize overall system utility against cost. The benefits of CM/PHM are: (1) operate power conversion systems in ways that will preclude predicted failures; (2) reduce unscheduled downtime and thereby reduce costs; and (3) pioneering reliability in SiC and GaN.

  17. Puget Sound Area Electric Reliability Plan : Scoping Summary Report - Part B Preliminary Technical Analysis Appendix A.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1991-09-01T23:59:59.000Z

    This report describes in general terms the nature of the voltage instability problem facing the Puget Sound area. The following two chapters cover the technical aspects of the problem. It deals with load growth, the root cause of the problem. Also addressed is the capacity of the current power system and the criteria for future system planning. It also explains the technical results of transmission system modeling which confirm the system's vulnerability to voltage instability, the principal symptom of the problem. The results of the scoping process in each of the four measure categories are presented. Included are lists of all options identified, a discussion of the screening criteria, and descriptions of the measures that survived the screening process and are proposed for further evaluation in Phase 2. We discuss the evaluation methodology which will be used to refine the analyses. The next steps in the planning process are outlined. It also describes the short term operational agreements that will assure continued reliable service until a long term solution is in place. 8 figs., 22 tabs.

  18. Dispatcher Reliability Analysis : SPICA-RAIL Experiments

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    consider that humans are fully reliable. But experience shows that many accidents involve human failuresDispatcher Reliability Analysis : SPICA-RAIL Experiments Fabien Belmonte, Jean-Louis Boulanger of scenarios and evaluate the behaviour of human operators. A state of the art in human reliability is pre

  19. 2007 iREP Symposium -Bulk Power System Dynamics and Control -VII, Revitalizing Operational Reliability August 19-24, 2007, Charleston SC, USA

    E-Print Network [OSTI]

    Dobson, Ian

    2007 iREP Symposium - Bulk Power System Dynamics and Control - VII, Revitalizing Operational. Established analytic methods of power system risk analysis can model the detail of some likely and foreseen cascading failure of electric power systems. The ability to efficiently quantify cascading blackout risk

  20. Virtually simulating the next generation of clean energy technologies: NETL's AVESTAR Center is dedicated to the safe, reliable and efficient operation of advanced energy plants with carbon capture

    SciTech Connect (OSTI)

    Zitney, S.

    2012-01-01T23:59:59.000Z

    Imagine using a real-time virtual simulator to learn to fly a space shuttle or rebuild your car's transmission without touching a piece of equipment or getting your hands dirty. Now, apply this concept to learning how to operate and control a state-of-the-art, electricity-producing power plant capable of carbon dioxide (CO{sub 2}) capture. That's what the National Energy Technology Laboratory's (NETL) Advanced Virtual Energy Simulation Training and Research (AVESTAR) Center (www.netl.doe.gov/avestar) is designed to do. Established as part of the Department of Energy's (DOE) initiative to advance new clean energy technology for power generation, the AVESTAR Center focuses primarily on providing simulation-based training for process engineers and energy plant operators, starting with the deployment of a first-of-a-kind operator training simulator for an integrated gasification combined cycle (IGCC) power plant with CO{sub 2} capture. The IGCC dynamic simulator builds on, and reaches beyond, conventional power plant simulators to merge, for the first time, a 'gasification with CO{sub 2} capture' process simulator with a 'combined-cycle' power simulator. Based on Invensys Operations Management's SimSci-Esscor DYNSIM software, the high-fidelity dynamic simulator provides realistic training on IGCC plant operations, including normal and faulted operations, as well as plant start-up, shutdown and power demand load changes. The highly flexible simulator also allows for testing of different types of fuel sources, such as petcoke and biomass, as well as co-firing fuel mixtures. The IGCC dynamic simulator is available at AVESTAR's two locations, NETL (Figure 1) and West Virginia University's National Research Center for Coal and Energy (www.nrcce.wvu.edu), both in Morgantown, W.Va. By offering a comprehensive IGCC training program, AVESTAR aims to develop a workforce well prepared to operate, control and manage commercial-scale gasification-based power plants with CO{sub 2} capture. The facility and simulator at West Virginia University promotes NETL's outreach mission by offering hands-on simulator training and education to researchers and university students.

  1. Comparison of the results of short-term static tests and single-pass flow-through tests with LRM glass.

    SciTech Connect (OSTI)

    Ebert, W. L.; Chemical Engineering

    2007-01-29T23:59:59.000Z

    Static dissolution tests were conducted to measure the forward dissolution rate of LRM glass at 70 C and pH(RT) 11.7 {+-} 0.1 for comparison with the rate measured with single-pass flow-through (SPFT) tests in an interlaboratory study (ILS). The static tests were conducted with monolithic specimens having known geometric surface areas, whereas the SPFT tests were conducted with crushed glass that had an uncertain specific surface area. The error in the specific surface area of the crushed glass used in the SPFT tests, which was calculated by modeling the particles as spheres, was assessed based on the difference in the forward dissolution rates measured with the two test methods. Three series of static tests were conducted at 70 C following ASTM standard test method C1220 using specimens with surfaces polished to 600, 800, and 1200 grit and a leachant solution having the same composition as that used in the ILS. Regression of the combined results of the static tests to the affinity-based glass dissolution model gives a forward rate of 1.67 g/(m{sup 2}d). The mean value of the forward rate from the SPFT tests was 1.64 g/(m{sup 2}d) with an extended uncertainty of 1.90 g/(m{sup 2}d). This indicates that the calculated surface area for the crushed glass used in the SPFT tests is less than 2% higher than the actual surface area, which is well within the experimental uncertainties of measuring the forward dissolution rate using each test method. These results indicate that the geometric surface area of crushed glass calculated based on the size of the sieves used to isolate the fraction used in a test is reliable. In addition, the C1220 test method provides a means for measuring the forward dissolution rate of borosilicate glasses that is faster, easier, and more economical than the SPFT test method.

  2. Operating Range Comments Details on page 149 Curve of constant assigned power rating

    E-Print Network [OSTI]

    Ida, Nathan

    . permissible winding temperature +100°C Weight of motor 0.35 g 8 pole permanent magnet 3 phased coil stator winding temperature will be reached during continuous oper- ation at 25°C ambient. = Thermal limit. Short term operation The motor may be briefly overloaded (recurring). Motor with high resistance winding

  3. Reliability-Centered Maintenance

    Broader source: Energy.gov [DOE]

    Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance.

  4. : : ". RSST I Lunar Day Counter Reliability Analysis

    E-Print Network [OSTI]

    Rathbun, Julie A.

    : : ". RSST I Lunar Day Counter Reliability Analysis NO. ATM 846 PAGE 1 REV. MO. OF 10 DATE 12/3/69 This ATM presents a Reliability analysis of the Lunar Day Counter, the Resettable Solid State Timer (RSST equipment. The analysis is based on a parts count, average failure rates and two (2) years operation

  5. Secure and reliable operation of our

    E-Print Network [OSTI]

    Amin, S. Massoud

    the weather. Electric power systems constitute the fundamental infrastructure of modern society. A suc of threats: · Attacks upon the power system. In this case, the electricity infrastructure itself to national and international economy, security, and quality of life. Massoud Amin, Electric Power Research

  6. Distributed Generation Operational Reliability and Availability Database,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised Finding of No53197E T ADRAFTJanuary 2004 | Department

  7. Distributed Generation Operational Reliability, Executive Summary Report,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised Finding of No53197E T ADRAFTJanuary 2004 | DepartmentJanuary 2004 |

  8. QIP Short Term Course Application of Renewable

    E-Print Network [OSTI]

    Kumar, M. Jagadesh

    Delhi - 110016, India Course contents · Fundamentals of solar radiation · Solar cell material · CO2 mitigation and credit · PV modules/arrays · Batteries · Hybrid systems (wind, hydro etc.) · Life cycle cost

  9. APPLICATION FORM Short term course on

    E-Print Network [OSTI]

    Srivastava, Kumar Vaibhav

    Address: Prof. Tapan K. Sengupta High Performance Computing Lab Department of Aerospace Venue : IIT Kanpur, Kanpur Organized by: High Performance Computing Lab, Dept. of Aerospace Engineering

  10. Short-Term Energy Outlook May 2014

    Gasoline and Diesel Fuel Update (EIA)

    by the U.S. Supreme Court reversing a lower court opinion that vacated the Cross-State Air Pollution Rule (CSAPR). CSAPR will replace the Clean Air Interstate Rule (CAIR). The...

  11. Short-Term Energy Outlook January 2014

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghurajiConventionalMississippi"site.1 Relative Standard ErrorsSeptember 24, 2014 MEMORANDUM7,5:January

  12. Short-Term Energy Outlook April 2014

    U.S. Energy Information Administration (EIA) Indexed Site

    -0.5 0.0 0.5 1.0 1.5 2013 2014 2015 OPEC countries North America Russia and Caspian Sea Latin America North Sea Other Non-OPEC World Crude Oil and Liquid Fuels Production Growth...

  13. August 2012 Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline prices4 OilU.S.5AreOil andMarket Module

  14. September 2012 Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Energy I I' a eviequestionnairesMillionNovember 20006 Table

  15. Short Term Energy Outlook ,November 2002

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Energy I I' a eviequestionnairesMillionNovemberData

  16. Short Term Energy Outlook ,October 2002

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Energy I I' a eviequestionnairesMillionNovemberDataOctober 2002 1

  17. Short Term Energy Outlook, December 2002

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Energy I I' a eviequestionnairesMillionNovemberDataOctober 2002

  18. Short Term Energy Outlook, February 2003

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002 13 1

  19. Short Term Energy Outlook, January 2003

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002 13 13 1

  20. Short Term Energy Outlook, March 2003

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002 13 13 13 1

  1. Short-Term Energy Outlook April 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002‹00

  2. Short-Term Energy Outlook February 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002‹004 1

  3. Short-Term Energy Outlook January 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002‹004 1(STEO)

  4. Short-Term Energy Outlook July 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002‹004

  5. Short-Term Energy Outlook June 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002‹0041 June

  6. Short-Term Energy Outlook March 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002‹0041

  7. Short-Term Energy Outlook May 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002‹0041(STEO)

  8. Short-Term Energy Outlook September 2013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober

  9. Short-Term Energy Outlook September 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctoberOutlook September

  10. Power electronics reliability analysis.

    SciTech Connect (OSTI)

    Smith, Mark A.; Atcitty, Stanley

    2009-12-01T23:59:59.000Z

    This report provides the DOE and industry with a general process for analyzing power electronics reliability. The analysis can help with understanding the main causes of failures, downtime, and cost and how to reduce them. One approach is to collect field maintenance data and use it directly to calculate reliability metrics related to each cause. Another approach is to model the functional structure of the equipment using a fault tree to derive system reliability from component reliability. Analysis of a fictitious device demonstrates the latter process. Optimization can use the resulting baseline model to decide how to improve reliability and/or lower costs. It is recommended that both electric utilities and equipment manufacturers make provisions to collect and share data in order to lay the groundwork for improving reliability into the future. Reliability analysis helps guide reliability improvements in hardware and software technology including condition monitoring and prognostics and health management.

  11. Human Reliability Program Overview

    SciTech Connect (OSTI)

    Bodin, Michael

    2012-09-25T23:59:59.000Z

    This presentation covers the high points of the Human Reliability Program, including certification/decertification, critical positions, due process, organizational structure, program components, personnel security, an overview of the US DOE reliability program, retirees and academia, and security program integration.

  12. Medical Aspects of Reliability

    SciTech Connect (OSTI)

    Atencio, Julian J.

    2014-05-05T23:59:59.000Z

    This presentation covers the medical evaluation as part of a human reliability program, particularly the various medical qualifications and potential disqualifiers.

  13. Lifetime and Reliability

    Broader source: Energy.gov [DOE]

    A DOE Solid-State Lighting Program technology fact sheet on lifetime, reliability, and failure as related to LED-based products.

  14. Medical Device Reliability BIOMATERIALS

    E-Print Network [OSTI]

    NEMI Medical Electronics team to address short- and long-term reliability issues with medical devices. OurMedical Device Reliability BIOMATERIALS Our goal is to provide medical device manufacturers, and consistency of active implantable medical devices. These devices, including pacemakers, cardiac defibrillators

  15. Integrating Solar PV in Utility System Operations

    SciTech Connect (OSTI)

    Mills, A.; Botterud, A.; Wu, J.; Zhou, Z.; Hodge, B-M.; Heany, M.

    2013-10-31T23:59:59.000Z

    This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, and day-ahead (DA) forecast errors as the difference in production costs between a case with “realistic” PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with “well behaved” PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved relative to DA forecasts, but still imperfect. Finally, we represent decisions within the operating hour by schedulers and transmission system operators as real-time (RT) balancing. We simulate the DA and HA scheduling processes with a detailed unit-commitment (UC) and economic dispatch (ED) optimization model. This model creates a least-cost dispatch and commitment plan for the conventional generating units using forecasts and reserve requirements as inputs. We consider only the generation units and load of the utility in this analysis; we do not consider opportunities to trade power with neighboring utilities. We also do not consider provision of reserves from renewables or from demand-side options. We estimate dynamic reserve requirements in order to meet reliability requirements in the RT operations, considering the uncertainty and variability in load, solar PV, and wind resources. Balancing reserve requirements are based on the 2.5th and 97.5th percentile of 1-min deviations from the HA schedule in a previous year. We then simulate RT deployment of balancing reserves using a separate minute-by-minute simulation of deviations from the HA schedules in the operating year. In the simulations we assume that balancing reserves can be fully deployed in 10 min. The minute-by-minute deviations account for HA forecasting errors and the actual variability of the load, wind, and solar generation. Using these minute-by-minute deviations and deployment of balancing reserves, we evaluate the impact of PV on system reliability through the calculation of the standard reliability metric called Control Performance Standard 2 (CPS2). Broadly speaking, the CPS2 score measures the percentage of 10-min periods in which a balancing area is able to balance supply and demand within a specific threshold. Compliance with the North American Electric Reliability Corporation (NERC) reliability standards requires that the CPS2 score must exceed 90% (i.e., the balancing area must maintain adequate balance for 90% of the 10-min periods). The combination of representing DA forecast errors in the

  16. Photovoltaic system reliability

    SciTech Connect (OSTI)

    Maish, A.B.; Atcitty, C. [Sandia National Labs., NM (United States); Greenberg, D. [Ascension Technology, Inc., Lincoln Center, MA (United States)] [and others

    1997-10-01T23:59:59.000Z

    This paper discusses the reliability of several photovoltaic projects including SMUD`s PV Pioneer project, various projects monitored by Ascension Technology, and the Colorado Parks project. System times-to-failure range from 1 to 16 years, and maintenance costs range from 1 to 16 cents per kilowatt-hour. Factors contributing to the reliability of these systems are discussed, and practices are recommended that can be applied to future projects. This paper also discusses the methodology used to collect and analyze PV system reliability data.

  17. Reliable solar: powering communities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Scienceand Requirements Recently ApprovedReliability Technology earns award ReliabilityReliable

  18. SQUIDSQUID systems for acousticsystems for acoustic GW detectors:GW detectors: progressprogress inin sensitivitysensitivity and long-and long-term reliabilityterm reliability

    E-Print Network [OSTI]

    inin sensitivitysensitivity and long-and long-term reliabilityterm reliability Main features · Operates

  19. Short-Term Exchange Financial Statement Non-degree, Short-Term, Special Students

    E-Print Network [OSTI]

    for tuition with the estimated cost of your program. Do the same for each category A-G even if you to discuss Visa alternatives. STUDENT INFORMATION LAST/FAMILY NAME, capitalized First/Given Name Middle Name information regarding health insurance visit the ISSS website at http://www.vanderbilt.edu/isss/resources

  20. Reliability and Safety

    Broader source: Energy.gov [DOE]

    DOE solar reliability and safety research and development (R&D) focuses on testing photovoltaic (PV) modules, inverters, and systems for long-term performance, and helping investors, consumers,...

  1. Gearbox Reliability Collaborative Update (Presentation)

    SciTech Connect (OSTI)

    Sheng, S.

    2013-10-01T23:59:59.000Z

    This presentation was given at the Sandia Reliability Workshop in August 2013 and provides information on current statistics, a status update, next steps, and other reliability research and development activities related to the Gearbox Reliability Collaborative.

  2. Sandia Energy - PV Systems Reliability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Systems Reliability Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics PV Systems Reliability PV Systems ReliabilityCoryne Tasca2015-05-08T03:40:54+00:00...

  3. Photovoltaic module reliability workshop

    SciTech Connect (OSTI)

    Mrig, L. (ed.)

    1990-01-01T23:59:59.000Z

    The paper and presentations compiled in this volume form the Proceedings of the fourth in a series of Workshops sponsored by Solar Energy Research Institute (SERI/DOE) under the general theme of photovoltaic module reliability during the period 1986--1990. The reliability Photo Voltaic (PV) modules/systems is exceedingly important along with the initial cost and efficiency of modules if the PV technology has to make a major impact in the power generation market, and for it to compete with the conventional electricity producing technologies. The reliability of photovoltaic modules has progressed significantly in the last few years as evidenced by warranties available on commercial modules of as long as 12 years. However, there is still need for substantial research and testing required to improve module field reliability to levels of 30 years or more. Several small groups of researchers are involved in this research, development, and monitoring activity around the world. In the US, PV manufacturers, DOE laboratories, electric utilities and others are engaged in the photovoltaic reliability research and testing. This group of researchers and others interested in this field were brought together under SERI/DOE sponsorship to exchange the technical knowledge and field experience as related to current information in this important field. The papers presented here reflect this effort.

  4. ISSAT 2012 KCoverage Reliability Evaluation K-COVERAGE RELIABILITY EVALUATION

    E-Print Network [OSTI]

    Xing, Liudong

    #12;7/20/2012 ISSAT 2012 KCoverage Reliability Evaluation forWSNs 2 Introduction Wireless sensor;7/20/2012 ISSAT 2012 KCoverage Reliability Evaluation forWSNs 7 Model 13 Consider a set of sensor nodes (SN7/20/2012 ISSAT 2012 KCoverage Reliability Evaluation forWSNs 1 K-COVERAGE RELIABILITY EVALUATION

  5. Operating Efficiency Comes From Teamwork

    E-Print Network [OSTI]

    Relyea, D. L.; Stone, A.

    A group of operating and planning personnel formed the INter Plant Utilities Team [INPUT] to improve energy efficiency and reliability for Exxon's Baytown, Texas, refinery and chemical plants complex. The Team coordinates the day-to-day operations...

  6. 1992 annual report of the North American Electric Reliability Council

    SciTech Connect (OSTI)

    Not Available

    1992-01-01T23:59:59.000Z

    This report describes the operation and concerns of the North American Electric Reliability Council and contains contributions from each of its member regional councils concerning reliability of electric power in their representative areas. The topics of the reports include current and future electric system reliability, regional monitoring, planning, telecommunications, the generating availability data system, technical services available, installed capacity changes, equipment changes, unusual events, hurricane Andrew, and ice storms.

  7. SAFETY REGULATION GROUP FLIGHT OPERATIONS

    E-Print Network [OSTI]

    Ladkin, Peter B.

    WHEN THE ACCURACY OR RELIABILITY OF NAVIGATION EQUIPMENT IS IN DOUBT DURING THE APPROACH PHASE 1://www.caa.co.uk/publications 16/2003 IN THIS ISSUE 1 OPERATIONAL CONSIDERATIONS WHEN THE ACCURACY OR RELIABILITY OF NAVIGATION EQUIPMENT IS IN DOUBT DURING THE APPROACH PHASE 2 RUNWAY INCURSION AWARENESS 1 OPERATIONAL CONSIDERATIONS

  8. Reliability of Electrical Interconnects (Presentation)

    SciTech Connect (OSTI)

    Devoto, D.

    2014-06-01T23:59:59.000Z

    This presentation discusses the status of NREL's research on the reliability of electrical interconnects.

  9. Empirical Bayes Estimation of Reliability

    E-Print Network [OSTI]

    Pensky, Marianna

    types of equipment relies on statistical inference about char- acteristics of reliabilityEmpirical Bayes Estimation of Reliability Introduction Assessment of the reliability of various such as reliability function, mean lifetime of the devices, or failure rate. Gen- eral techniques of statistical

  10. RELIABILITY COMPARISON MODELS FOR OFFSHORE WIND TURBINES (OWT)

    E-Print Network [OSTI]

    Bernstein, Joseph B.

    RELIABILITY COMPARISON MODELS FOR OFFSHORE WIND TURBINES (OWT) Yizhou Lu, T. M. Delorm, A. Christou of survivor functions R(t) of drive-trains, after 1 year of operation, between Offshore Wind Turbine (OWT) vs of the reliability of these 5 Types Surrogate failure rate data Onshore wind turbines (OT) 1-1.5MW CONCLUSIONS

  11. A reliability assessment methodology for distribution systems with distributed generation 

    E-Print Network [OSTI]

    Duttagupta, Suchismita Sujaya

    2006-08-16T23:59:59.000Z

    Reliability assessment is of primary importance in designing and planning distribution systems that operate in an economic manner with minimal interruption of customer loads. With the advances in renewable energy sources, ...

  12. A reliability assessment methodology for distribution systems with distributed generation

    E-Print Network [OSTI]

    Duttagupta, Suchismita Sujaya

    2006-08-16T23:59:59.000Z

    Reliability assessment is of primary importance in designing and planning distribution systems that operate in an economic manner with minimal interruption of customer loads. With the advances in renewable energy sources, Distributed Generation (DG...

  13. Experiences with Two Reliability Data Collection Efforts (Presentation)

    SciTech Connect (OSTI)

    Sheng, S.; Lantz, E.

    2013-08-01T23:59:59.000Z

    This presentation, given by NREL at the Wind Reliability Experts Meeting in Albuquerque, New Mexico, outlines the causes of wind plant operational expenditures and gearbox failures and describes NREL's efforts to create a gearbox failure database.

  14. Continuous Reliability Enhancement for Wind (CREW) database : wind plant reliability benchmark.

    SciTech Connect (OSTI)

    Hines, Valerie Ann-Peters; Ogilvie, Alistair B.; Bond, Cody R.

    2013-09-01T23:59:59.000Z

    To benchmark the current U.S. wind turbine fleet reliability performance and identify the major contributors to component-level failures and other downtime events, the Department of Energy funded the development of the Continuous Reliability Enhancement for Wind (CREW) database by Sandia National Laboratories. This report is the third annual Wind Plant Reliability Benchmark, to publically report on CREW findings for the wind industry. The CREW database uses both high resolution Supervisory Control and Data Acquisition (SCADA) data from operating plants and Strategic Power Systems' ORAPWind%C2%AE (Operational Reliability Analysis Program for Wind) data, which consist of downtime and reserve event records and daily summaries of various time categories for each turbine. Together, these data are used as inputs into CREW's reliability modeling. The results presented here include: the primary CREW Benchmark statistics (operational availability, utilization, capacity factor, mean time between events, and mean downtime); time accounting from an availability perspective; time accounting in terms of the combination of wind speed and generation levels; power curve analysis; and top system and component contributors to unavailability.

  15. Human Reliability Program Workshop

    SciTech Connect (OSTI)

    Landers, John; Rogers, Erin; Gerke, Gretchen

    2014-05-18T23:59:59.000Z

    A Human Reliability Program (HRP) is designed to protect national security as well as worker and public safety by continuously evaluating the reliability of those who have access to sensitive materials, facilities, and programs. Some elements of a site HRP include systematic (1) supervisory reviews, (2) medical and psychological assessments, (3) management evaluations, (4) personnel security reviews, and (4) training of HRP staff and critical positions. Over the years of implementing an HRP, the Department of Energy (DOE) has faced various challenges and overcome obstacles. During this 4-day activity, participants will examine programs that mitigate threats to nuclear security and the insider threat to include HRP, Nuclear Security Culture (NSC) Enhancement, and Employee Assistance Programs. The focus will be to develop an understanding of the need for a systematic HRP and to discuss challenges and best practices associated with mitigating the insider threat.

  16. Reliable computation Peter Gacs

    E-Print Network [OSTI]

    Gacs, Peter

    of compressors 28 4.6. Exercises 30 5. The reliable storage problem 32 5.1. Clocked circuits 32 5.2. Storage 34 5.1. Cables 21 4.2. Compressors 23 4.3. Propagating safety 25 4.4. Endgame 26 4.5. The construction.3. Error-correcting codes 35 5.4. Refreshers 39 5.5. Exercises 48 6. Problems 49 7. Historical remarks 51

  17. Reliability Compliance Management Specialist

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration, Corporate Services Office, Office of the Chief Operating Office, Risk and...

  18. Wind turbine reliability : a database and analysis approach.

    SciTech Connect (OSTI)

    Linsday, James (ARES Corporation); Briand, Daniel; Hill, Roger Ray; Stinebaugh, Jennifer A.; Benjamin, Allan S. (ARES Corporation)

    2008-02-01T23:59:59.000Z

    The US wind Industry has experienced remarkable growth since the turn of the century. At the same time, the physical size and electrical generation capabilities of wind turbines has also experienced remarkable growth. As the market continues to expand, and as wind generation continues to gain a significant share of the generation portfolio, the reliability of wind turbine technology becomes increasingly important. This report addresses how operations and maintenance costs are related to unreliability - that is the failures experienced by systems and components. Reliability tools are demonstrated, data needed to understand and catalog failure events is described, and practical wind turbine reliability models are illustrated, including preliminary results. This report also presents a continuing process of how to proceed with controlling industry requirements, needs, and expectations related to Reliability, Availability, Maintainability, and Safety. A simply stated goal of this process is to better understand and to improve the operable reliability of wind turbine installations.

  19. Systems reliability analysis for the national ignition facility

    SciTech Connect (OSTI)

    Majumdar, K.C.; Annese, C.E.; MacIntyre, A.T.; Sicherman, A.

    1996-06-12T23:59:59.000Z

    A Reliability, Availability and Maintainability (RAM) analysis was initiated for the National Ignition Facility (NIF). The NIF is an inertial confinement fusion research facility designed to achieve controlled thermonuclear reaction; the preferred site for the NIF is the Lawrence Livermore National Laboratory (LLNL). The NIF RAM analysis has three purposes: (1) to allocate top level reliability and availability goals for the systems, (2) to develop an operability model for optimum maintainability, and (3) to determine the achievability of the allocated goals of the RAM parameters for the NIF systems and the facility operation as a whole. An allocation model assigns the reliability and availability goals for front line and support systems by a top-down approach; reliability analysis uses a bottom-up approach to determine the system reliability and availability from component level to system level.

  20. Real Time Grid Reliability Management 2005

    SciTech Connect (OSTI)

    Eto, Joe; Eto, Joe; Lesieutre, Bernard; Lewis, Nancy Jo; Parashar, Manu

    2008-07-07T23:59:59.000Z

    The increased need to manage California?s electricity grid in real time is a result of the ongoing transition from a system operated by vertically-integrated utilities serving native loads to one operated by an independent system operator supporting competitive energy markets. During this transition period, the traditional approach to reliability management -- construction of new transmission lines -- has not been pursued due to unresolved issues related to the financing and recovery of transmission project costs. In the absence of investments in new transmission infrastructure, the best strategy for managing reliability is to equip system operators with better real-time information about actual operating margins so that they can better understand and manage the risk of operating closer to the edge. A companion strategy is to address known deficiencies in offline modeling tools that are needed to ground the use of improved real-time tools. This project: (1) developed and conducted first-ever demonstrations of two prototype real-time software tools for voltage security assessment and phasor monitoring; and (2) prepared a scoping study on improving load and generator response models. Additional funding through two separate subsequent work authorizations has already been provided to build upon the work initiated in this project.

  1. Testing for PV Reliability (Presentation)

    SciTech Connect (OSTI)

    Kurtz, S.; Bansal, S.

    2014-09-01T23:59:59.000Z

    The DOE SUNSHOT workshop is seeking input from the community about PV reliability and how the DOE might address gaps in understanding. This presentation describes the types of testing that are needed for PV reliability and introduces a discussion to identify gaps in our understanding of PV reliability testing.

  2. Reliability assessment of autonomous power systems incorporating HVDC interconnection links

    SciTech Connect (OSTI)

    Dialynas, E.N.; Koskolos, N.C. [National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering] [National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering; Agoris, D. [Public Power Corp., Athens (Greece)] [Public Power Corp., Athens (Greece)

    1996-01-01T23:59:59.000Z

    The objective of this paper is to present an improved computational method for the overall reliability assessment of autonomous power systems that may or may not contain HVdc interconnection links. This is a hybrid method based on a Monte-Carlo simulation sequential approach which incorporates an analytical approach for the reliability modeling of the HVdc transmission links. The developed models and techniques have been implemented into a computer program that can be used to simulate the operational practices and characteristics of the overall system under study efficiently and realistically. A set of reliability indices are calculated for each load-point of interest and the entire system while a set of additional indices is calculated for quantifying the reliability performance of the interconnection links under the specified operating requirements. The analysis of a practical system is also included for a number of studies representing its various operating and design characteristics.

  3. CERTS: Consortium for Electric Reliability Technology Solutions - Research Highlights

    SciTech Connect (OSTI)

    Eto, Joseph

    2003-07-30T23:59:59.000Z

    Historically, the U.S. electric power industry was vertically integrated, and utilities were responsible for system planning, operations, and reliability management. As the nation moves to a competitive market structure, these functions have been disaggregated, and no single entity is responsible for reliability management. As a result, new tools, technologies, systems, and management processes are needed to manage the reliability of the electricity grid. However, a number of simultaneous trends prevent electricity market participants from pursuing development of these reliability tools: utilities are preoccupied with restructuring their businesses, research funding has declined, and the formation of Independent System Operators (ISOs) and Regional Transmission Organizations (RTOs) to operate the grid means that control of transmission assets is separate from ownership of these assets; at the same time, business uncertainty, and changing regulatory policies have created a climate in which needed investment for transmission infrastructure and tools for reliability management has dried up. To address the resulting emerging gaps in reliability R&D, CERTS has undertaken much-needed public interest research on reliability technologies for the electricity grid. CERTS' vision is to: (1) Transform the electricity grid into an intelligent network that can sense and respond automatically to changing flows of power and emerging problems; (2) Enhance reliability management through market mechanisms, including transparency of real-time information on the status of the grid; (3) Empower customers to manage their energy use and reliability needs in response to real-time market price signals; and (4) Seamlessly integrate distributed technologies--including those for generation, storage, controls, and communications--to support the reliability needs of both the grid and individual customers.

  4. Improved Saltstone Facilities Restart Operations | Department...

    Office of Environmental Management (EM)

    to provide a new and more reliable system to process larger amounts of decontaminated salt solution needed for future tank closure operations. Saltstone processs and disposes of...

  5. Sandia National Laboratories: optimal solar asset operations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    operations and maintenance Sandia-Electric Power Research Institute Partnership Publishes Photovoltaic Reliability Report On January 21, 2014, in Energy, Facilities, Grid...

  6. RELIABILITY ANALYSIS IN A FAULT TOLERANT CONTROL STRATEGY DEDICATED TO ACTIVE POWER FILTER

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    RELIABILITY ANALYSIS IN A FAULT TOLERANT CONTROL STRATEGY DEDICATED TO ACTIVE POWER FILTER P. WEBER reliability indicate the optimal structure. Keywords: Fault Tolerant Control, System Reliability, Active power control and nuclear power plant operation (Zhang and Jiang, 2003). Various studies on FTC are based

  7. MULTIAREA SYSTEM RELIABILITY: THE ECONOMIC EVALUATION OF SYSTEM SECURITY CRITERIA

    E-Print Network [OSTI]

    Gross, George

    MULTIAREA SYSTEM RELIABILITY: THE ECONOMIC EVALUATION OF SYSTEM SECURITY CRITERIA BY TEOMAN GULER B assessment studies and the quantification of the economics of secure power system operations security and the economics of secure operations in the competitive market environment. The advent

  8. UCSD Jacobs School of Engineering 9500 Gilman Drive, La Jolla, CA 92093-0433

    E-Print Network [OSTI]

    Wang, Deli

    Sky Imager has developed a solar forecast tool that provides in-depth future power output estimates's data provides grid operators with reliable short term power output forecast capabilities to better on detecting cloud position and motion to accurately predict short term solar power output Allows solar

  9. Sandia National Laboratories: Inverter Reliability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in Hosted by Sandia National Laboratories and the Electric Power Research Institute (EPRI) Inverter reliability drives project life cycle costs and plant performance. This...

  10. Sandia National Laboratories: Component Reliability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in Hosted by Sandia National Laboratories and the Electric Power Research Institute (EPRI) Inverter reliability drives project life cycle costs and plant performance. This...

  11. 2014 Human Reliability Program Workshop

    Broader source: Energy.gov [DOE]

    Announcing The Human Reliability Program Workshop Sponsored by Office of Security (AU-50), U.S Department of Energy In collaboration with NA, NE, EM and SC

  12. Sandia National Laboratories: PV Reliability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reliability Sandia Research on PV Arc-Fault Detection Submitted for US Patent On March 4, 2015, in Computational Modeling & Simulation, Energy, Facilities, News, News & Events,...

  13. Reliability Estimation for Double Containment Piping

    SciTech Connect (OSTI)

    L. Cadwallader; T. Pinna

    2012-08-01T23:59:59.000Z

    Double walled or double containment piping is considered for use in the ITER international project and other next-generation fusion device designs to provide an extra barrier for tritium gas and other radioactive materials. The extra barrier improves confinement of these materials and enhances safety of the facility. This paper describes some of the design challenges in designing double containment piping systems. There is also a brief review of a few operating experiences of double walled piping used with hazardous chemicals in different industries. This paper recommends approaches for the reliability analyst to use to quantify leakage from a double containment piping system in conceptual and more advanced designs. The paper also cites quantitative data that can be used to support such reliability analyses.

  14. Reliable Gas Turbine Output: Attaining Temperature Independent Performance

    E-Print Network [OSTI]

    Neeley, J. E.; Patton, S.; Holder, F.

    % of the electric system, could create reliability and operational problems. This paper explores the potential for maintaining constant, reliable outputs from gas turbines by cooling ambient air temperatures before the air is used in the compressor section... strides have been made in the development of both aircraft, aircraft-derivative, and industrial gas turbines. The Basic Cycle The basic gas turbine engine consists of a compressor, a combustor, and a turbine in series. The intake air is compressed...

  15. Operational experience with superconducting synchrotron magnets

    SciTech Connect (OSTI)

    Martin, P.S.

    1987-03-01T23:59:59.000Z

    The operational experience with the Fermilab Tevatron is presented, with emphasis on reliability and failure modes. Comprisons are made between the operating efficiencies for the superconducting machine and for he conventional Main Ring.

  16. RELIABILITY OF CAPACITOR CHARGING UNITS

    E-Print Network [OSTI]

    Sprott, Julien Clinton

    experience little change while those using the electronic cutoff would drift due to ageing components and changing parameters. The first few shots using the electronic cutoff were less reliable than subsequentRELIABILITY OF CAPACITOR CHARGING UNITS Clint Sprott July 30, 1965 University of Wisconsin

  17. Photovoltaic performance and reliability workshop

    SciTech Connect (OSTI)

    Mrig, L. [ed.

    1993-12-01T23:59:59.000Z

    This workshop was the sixth in a series of workshops sponsored by NREL/DOE under the general subject of photovoltaic testing and reliability during the period 1986--1993. PV performance and PV reliability are at least as important as PV cost, if not more. In the US, PV manufacturers, DOE laboratories, electric utilities, and others are engaged in the photovoltaic reliability research and testing. This group of researchers and others interested in the field were brought together to exchange the technical knowledge and field experience as related to current information in this evolving field of PV reliability. The papers presented here reflect this effort since the last workshop held in September, 1992. The topics covered include: cell and module characterization, module and system testing, durability and reliability, system field experience, and standards and codes.

  18. Individual Differences in Human Reliability Analysis

    SciTech Connect (OSTI)

    Jeffrey C. Joe; Ronald L. Boring

    2014-06-01T23:59:59.000Z

    While human reliability analysis (HRA) methods include uncertainty in quantification, the nominal model of human error in HRA typically assumes that operator performance does not vary significantly when they are given the same initiating event, indicators, procedures, and training, and that any differences in operator performance are simply aleatory (i.e., random). While this assumption generally holds true when performing routine actions, variability in operator response has been observed in multiple studies, especially in complex situations that go beyond training and procedures. As such, complexity can lead to differences in operator performance (e.g., operator understanding and decision-making). Furthermore, psychological research has shown that there are a number of known antecedents (i.e., attributable causes) that consistently contribute to observable and systematically measurable (i.e., not random) differences in behavior. This paper reviews examples of individual differences taken from operational experience and the psychological literature. The impact of these differences in human behavior and their implications for HRA are then discussed. We propose that individual differences should not be treated as aleatory, but rather as epistemic. Ultimately, by understanding the sources of individual differences, it is possible to remove some epistemic uncertainty from analyses.

  19. An evaluation of reduced amounts of advance traffic control for short duration and stop-and-go maintenance operations

    E-Print Network [OSTI]

    Balke, Kevin Neil

    1987-01-01T23:59:59.000Z

    of driver information as the traffic control setup for a short-term, minor maintenance operation. Four field studies were performed on a total of six candidate signing treatments with the cone taper. An additional two field studies that studied a total... of five of the candidate signing treatments without the cone taper were performed. Both lane distribution and erratic maneuvers were used to measure the performance of the candidate treatments. The results of these field studies indicated...

  20. Supervisory Feed-Forward Control for Real-Time Topping Cycle CHP Operation

    SciTech Connect (OSTI)

    Cho, Heejin; Luck, Rogelio; Chamra, Louay M.

    2010-03-01T23:59:59.000Z

    This paper presents an energy dispatch algorithm for real-time topping cycle Cooling, Heating, and Power (CHP) operation for buildings with the objective of minimizing the operational cost, primary energy consumption (PEC), or carbon dioxide emission (CDE). The algorithm features a supervisory feed-forward control for real-time CHP operation using short-term weather forecasting. The advantages of the proposed control scheme for CHP operation are (a) relatively simple and efficient implementation allowing realistic real-time operation , (b) optimized CHP operation with respect to operational cost, PEC, or CDE, and (c) increased site-energy consumption (SEC) resulting in less dependence on the electric grid. In the feed-forward portion of the control scheme, short-term electric, cooling, and heating loads are predicted using the U.S. Department of Energy (DOE) benchmark small office building model. The results are encouraging regarding the potential saving of operational cost, PEC, and CDE from using the control system for a CHP system with electric and thermal energy storages.

  1. JRF (Quality, Reliability and Operations Research): 2013 INDIAN STATISTICAL INSTITUTE

    E-Print Network [OSTI]

    Bandyopadhyay, Antar

    Research, (E) Quality Management and Systems and (F) Mathematics. A broad coverage for each of the above), Queuing theory (M/M/s), Game theory (two person zero-sum game). E. Quality Management and Systems: Quality, Quality planning, Quality costs, Total qual- ity management, Six sigma, Quality management system concepts

  2. Washington DC Reliability Requirements and the Need to Operate Mirant's

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradley Nickell Director ofDepartment of EnergyPotomac River

  3. Advancing Visibility of Grid Operations to Improve Reliability | Department

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 RussianBy:Whether you're a16-17, 201529, 2015LeadEnergyThe newFromof

  4. Washington DC Reliability Requirements and the Need to Operate Mirant's

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2Uranium TransferonUS-IndiaVALUE STUDY4, 2009Department of,

  5. Data Center Efficiency and IT Equipment Reliability at Wider Operating

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised Finding of No53197 This work was performedEnergy

  6. Advancing Visibility of Grid Operations to Improve Reliability | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of1 AAcceleratedDepartmentDepartment2 DOEX-RayDepartment ofof

  7. Photovoltaics performance and reliability workshop

    SciTech Connect (OSTI)

    Mrig, L. (ed.) [ed.

    1992-01-01T23:59:59.000Z

    This document consists of papers and viewgraphs compiled from the proceedings of a workshop held in September 1992. This workshop was the fifth in a series sponsored by NREL/DOE under the general subject areas of photovoltaic module testing and reliability. PV manufacturers, DOE laboratories, electric utilities and others exchanged technical knowledge and field experience. The topics of cell and module characterization, module and system performance, materials and module durability/reliability research, solar radiation, and applications are discussed.

  8. Photovoltaics performance and reliability workshop

    SciTech Connect (OSTI)

    Mrig, L. [ed.] [ed.

    1992-11-01T23:59:59.000Z

    This document consists of papers and viewgraphs compiled from the proceedings of a workshop held in September 1992. This workshop was the fifth in a series sponsored by NREL/DOE under the general subject areas of photovoltaic module testing and reliability. PV manufacturers, DOE laboratories, electric utilities and others exchanged technical knowledge and field experience. The topics of cell and module characterization, module and system performance, materials and module durability/reliability research, solar radiation, and applications are discussed.

  9. MEMS Reliability: Infrastructure, Test Structures, Experiments, and Failure Modes

    SciTech Connect (OSTI)

    TANNER,DANELLE M.; SMITH,NORMAN F.; IRWIN,LLOYD W.; EATON,WILLIAM P.; HELGESEN,KAREN SUE; CLEMENT,J. JOSEPH; MILLER,WILLIAM M.; MILLER,SAMUEL L.; DUGGER,MICHAEL T.; WALRAVEN,JEREMY A.; PETERSON,KENNETH A.

    2000-01-01T23:59:59.000Z

    The burgeoning new technology of Micro-Electro-Mechanical Systems (MEMS) shows great promise in the weapons arena. We can now conceive of micro-gyros, micro-surety systems, and micro-navigators that are extremely small and inexpensive. Do we want to use this new technology in critical applications such as nuclear weapons? This question drove us to understand the reliability and failure mechanisms of silicon surface-micromachined MEMS. Development of a testing infrastructure was a crucial step to perform reliability experiments on MEMS devices and will be reported here. In addition, reliability test structures have been designed and characterized. Many experiments were performed to investigate failure modes and specifically those in different environments (humidity, temperature, shock, vibration, and storage). A predictive reliability model for wear of rubbing surfaces in microengines was developed. The root causes of failure for operating and non-operating MEMS are discussed. The major failure mechanism for operating MEMS was wear of the polysilicon rubbing surfaces. Reliability design rules for future MEMS devices are established.

  10. FFTF (Fast Flux Test Facility) reactor shutdown system reliability reevaluation

    SciTech Connect (OSTI)

    Pierce, B.F.

    1986-07-01T23:59:59.000Z

    The reliability analysis of the Fast Flux Test Facility reactor shutdown system was reevaluated. Failure information based on five years of plant operating experience was used to verify original reliability numbers or to establish new ones. Also, system modifications made subsequent to performance of the original analysis were incorporated into the reevaluation. Reliability calculations and sensitivity analyses were performed using a commercially available spreadsheet on a personal computer. The spreadsheet was configured so that future failures could be tracked and compared with expected failures. A number of recommendations resulted from the reevaluation including both increased and decreased surveillance intervals. All recommendations were based on meeting or exceeding existing reliability goals. Considerable cost savings will be incurred upon implementation of the recommendations.

  11. Application of reliability concepts to the Nepal power system

    SciTech Connect (OSTI)

    Billinton, R.; Pandey, M.; Aboreshaid, S.; Fotuhi-Firuzabad, M. [Univ. of Saskatchewan, Saskatoon, Saskatchewan (Canada). Power Systems Research Group

    1995-12-31T23:59:59.000Z

    In many of the less industrialized countries throughout the world, reliability is incorporated in power system planning and operation using traditional deterministic techniques. This is the case with the Nepal Power System (NPS), where developed expansion plans have been based on non-probabilistic criteria. This paper illustrates the application of probabilistic methods to reliability evaluation of the NPS. Evaluations at both the generation and composite generation and transmission system levels have been performed. The overall system and nine major load centers have been assessed. These load points carry in total more than 54% of the system load. An assessment of an expansion plan proposed by the Nepal Electricity Authority (NEA) has been performed. The results indicate the reliability implications associated with the system and the proposed expansion plan, and show that quantitative reliability evaluation of the NPS is both possible and practical.

  12. Hidden State and ShortTerm Memory: A bibliography

    E-Print Network [OSTI]

    Littman, Michael L.

    for hidden markov models. 1993. [ Baum et al., 1970 ] Leonard E. Baum, Ted Petrie, George Soules, and Norman. [ McCallum, 1992 ] R. Andrew McCallum. First results with utile distinction memory for re­ inforcement. [ Moore, 1991 ] Andrew W. Moore. Variable res­ olution dynamic programming: Efficiently learning action

  13. III. -ECONOMY Pig production : short-term prospects

    E-Print Network [OSTI]

    Boyer, Edmond

    feed. The main price formation mechanisms on these markets are explained : the relationships between on the E.E.C. scene, formation of soyabean meal prices within the « oil and protein crop complexand price forecasting H. MAROUBY LT.P., Service Economie, 34, bd de la Gare, 3150!0 Toulouse As pig price

  14. assess short term: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and demand response programs in wholesale power markets with congestion managed by locational marginal prices are derived from DC optimal power flow solutions for day-ahead...

  15. Short-term earthquake prediction by reverse analysis of lithosphere ...

    E-Print Network [OSTI]

    2006-01-17T23:59:59.000Z

    Dec 13, 2005 ... a International Institute for Earthquake Prediction Theory and Mathematical Geophysics, Russian Ac. Sci., Warshavskoe sh.,. 79, korp.

  16. Environmental Studies Short-Term Study Abroad Program

    E-Print Network [OSTI]

    Papautsky, Ian

    GEOG263: People and Environment: Part III: Energy and Mineral Resources GEOG573: The Urban Habitat (3 & Policy EVST/POL602: Global Biodiversity Law & Policy (3 hrs) #12;

  17. Vehicle Technologies Office: Short-Term Lightweight Materials...

    Broader source: Energy.gov (indexed) [DOE]

    face barriers in cost and manufacturing. Manufacturers also face issues with joining, corrosion, repair, and recycling when they combine aluminum with other materials. VTO has...

  18. Integrated Short Term Navigation of a Towed Underwater Body \\Lambda

    E-Print Network [OSTI]

    LeGland, François

    is con­ sidered. An underwater body, to be called here­ after the fish, is towed by a surface ship centimeters, the trajectory of the fish relative to its otherwise unknown initial position, during a few­ cated on board of the fish, can be integrated. INS measurements are known to track accurately the high

  19. Integrated Short Term Navigation of a Towed Underwater Body*

    E-Print Network [OSTI]

    LeGland, François

    . An underwater body, to be called here- after the fish, is towed by a surface ship at the end of a few hundred of the fish relative to its otherwise unknown initial position, during a few minutes experiment, so, acceleration measurements pro- vided by an INS (inertial navigation system) lo- cated on board of the fish, can

  20. Vehicle Technologies Office: Short-Term Lightweight Materials...

    Broader source: Energy.gov (indexed) [DOE]

    for advanced high-strength steel and show how it can be used in vehicles. With the US Automotive Materials Partnership (USAMP) and the Auto Steel Partnership, the Office is...

  1. Newporter Apartments: Deep Energy Retrofit Short-Term Results

    SciTech Connect (OSTI)

    Gordon, A.; Howard, L.; Kunkle, R.; Lubliner, M.; Auer, D.; Clegg, Z.

    2012-12-01T23:59:59.000Z

    This project demonstrates a path to meet the goal of the Building America program to reduce home energy use by 30% in multi-family buildings. The project demonstrates cost effective energy savings targets as well as improved comfort and indoor environmental quality (IEQ) associated with deep energy retrofits by a large public housing authority as part of a larger rehabilitation effort. The project focuses on a typical 1960's vintage low-rise multi-family apartment community (120 units in three buildings).

  2. Long vs. short-term energy storage:sensitivity analysis.

    SciTech Connect (OSTI)

    Schoenung, Susan M. (Longitude 122 West, Inc., Menlo Park, CA); Hassenzahl, William V. (,Advanced Energy Analysis, Piedmont, CA)

    2007-07-01T23:59:59.000Z

    This report extends earlier work to characterize long-duration and short-duration energy storage technologies, primarily on the basis of life-cycle cost, and to investigate sensitivities to various input assumptions. Another technology--asymmetric lead-carbon capacitors--has also been added. Energy storage technologies are examined for three application categories--bulk energy storage, distributed generation, and power quality--with significant variations in discharge time and storage capacity. Sensitivity analyses include cost of electricity and natural gas, and system life, which impacts replacement costs and capital carrying charges. Results are presented in terms of annual cost, $/kW-yr. A major variable affecting system cost is hours of storage available for discharge.

  3. When Do I Report a Short Term Disability Claim?

    E-Print Network [OSTI]

    Weaver, Harold A. "Hal"

    the patient may include information relating to any advice, diagnosis, prognosis, treatment or care of my, prescriptions or treatment, including x-ray plates and hospital records, records of drug or alcohol abuse and treatment, communicable disease, Human Immunodeficiency Syndrome (HIV), or Acquired Immune Deficiency

  4. Microsoft Word - Alcoa_short-term_amendments_CX.docx

    Broader source: Energy.gov (indexed) [DOE]

    the same level of service under an existing power sales contract to the Intalco smelter in Ferndale, WA. These amendments would further extend this service for up to an...

  5. SHORT-TERM EVOLUTION OF CORONAL HOLE BOUNDARIES

    SciTech Connect (OSTI)

    Krista, Larisza D.; Gallagher, Peter T.; Bloomfield, D. Shaun [Astrophysics Research Group, School of Physics, Trinity College Dublin, Dublin 2 (Ireland)

    2011-04-20T23:59:59.000Z

    The interaction of open and closed field lines at coronal hole (CH) boundaries is widely accepted to be due to interchange magnetic reconnection. To date, it is unclear how the boundaries vary on short timescales and at what velocity this occurs. Here, we describe an automated boundary tracking method used to determine CH boundary displacements on short timescales. The boundary displacements were found to be isotropic and to have typical expansion/contraction speeds of {<=}2 km s{sup -1}, which indicate magnetic reconnection rates of {<=}3 x 10{sup -3}. The observed displacements were used in conjunction with the interchange reconnection model to derive typical diffusion coefficients of {<=}3 x 10{sup 13} cm{sup 2} s{sup -1}. These results are consistent with an interchange reconnection process in the low corona driven by the random granular motions of open and closed fields in the photosphere.

  6. Modular hybrid pier : fender system short term tests

    E-Print Network [OSTI]

    Lee, Jerry Jing Peng

    2008-01-01T23:59:59.000Z

    Lateral restraint system provided in this testing program was effective to prevent sidesway buckling

  7. Energy Information Administration/Short-Term Energy Outlook - April 2005

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto17 3400, U.S.MajorMarkets EnergyConsumption SurveySurvey99253April

  8. Energy Information Administration/Short-Term Energy Outlook - April 2006

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto17 3400, U.S.MajorMarkets EnergyConsumption

  9. Energy Information Administration/Short-Term Energy Outlook - July 2005

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto17 3400, U.S.MajorMarkets EnergyConsumption5 1

  10. February 2013 Short-Term Energy Outlook (STEO)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto17 3400, U.S.MajorMarkets EnergyConsumption5Values shown

  11. January 2013 Short-Term Energy Outlook (STEO)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto17 3400, U.S.MajorMarketsNov-14 Dec-14Has|Issues inU N E 1 5 , 2

  12. March 2013 Short-Term Energy Outlook (STEO)

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122 40 Buildingto17 3400,Information Administration (EIA) Archive(STEO) Highlights

  13. April 2013 Short-Term Energy and Summer Fuels Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline prices4 OilU.S.5 (Million8103.SourceU.S.and

  14. December 2012 Short-Term Energy Outlook (STEO)

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade Year-0E (2001)gasoline353/06) 2Yonthly Energy : 42Q)2Q)6)2k(STEO) ï‚·

  15. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)2009 201070,174Natural Gas

  16. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)2009 201070,174Natural

  17. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)2009 201070,174Naturalcontinue

  18. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)2009

  19. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75 per MMBtu

  20. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75 per MMBturange

  1. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75 per

  2. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75 per$3.67 per

  3. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75 per$3.67

  4. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75 per$3.67the

  5. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75

  6. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75Now that the

  7. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75Now that theIn

  8. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75Now that

  9. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75Now thatthrough

  10. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75Now thatthrough

  11. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75Now

  12. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75Nowin September

  13. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75Nowin

  14. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75Nowin8 per

  15. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75Nowin8 per4.41

  16. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75Nowin8

  17. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75Nowin8the rest

  18. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75Nowin8the

  19. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and $2.75Nowin8theprices

  20. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 and

  1. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 andEIA projects that

  2. Natural Gas Summary from the Short-Term Energy Outlook

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for On-Highway4,1,50022,3,,,,6,1,9,1,50022,3,,,,6,1,Decade1 Source: Office of(Millionthrough 1996)200971 andEIA projects thatThe

  3. Vehicle Technologies Office: Short-Term Lightweight Materials Research

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015ofDepartment of Energy MicrosoftVOLUME I AThe

  4. Short-Term Energy Outlook April 1999-Summer Gasoline Outlook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002‹

  5. Short-Term Energy Outlook April 2000--STEO Preface

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over Our Instagram Secretary Moniz9 SeptemberSetting theSheldonOctober 2002‹00 Summer

  6. Electricity storage for short term power system service (Smart Grid

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model,DOEHazel Crest, Illinois:EdinburghEldorado IvanpahGasProject) | Open(Smart

  7. Constructing Reliable Distributed Communication Systems with CORBA

    E-Print Network [OSTI]

    Schmidt, Douglas C.

    Constructing Reliable Distributed Communication Systems with CORBA Silvano Maffeis Douglas C model to support reliable data- and process- oriented distributed systems that communicate through syn distributed object computing systems with CORBA. First, we examine the question of whether reliable applica

  8. RF-MEMS capacitive switches with high reliability

    DOE Patents [OSTI]

    Goldsmith, Charles L.; Auciello, Orlando H.; Carlisle, John A.; Sampath, Suresh; Sumant, Anirudha V.; Carpick, Robert W.; Hwang, James; Mancini, Derrick C.; Gudeman, Chris

    2013-09-03T23:59:59.000Z

    A reliable long life RF-MEMS capacitive switch is provided with a dielectric layer comprising a "fast discharge diamond dielectric layer" and enabling rapid switch recovery, dielectric layer charging and discharging that is efficient and effective to enable RF-MEMS switch operation to greater than or equal to 100 billion cycles.

  9. Distributed Reliable Object-Oriented Programming (DROOP)

    E-Print Network [OSTI]

    Guerraoui, Rachid

    Distributed Reliable Object-Oriented Programming (DROOP) P. Eugster November 3, 2003 Abstract with such failures, coining the term Distributed Reliable Object-Oriented Programming (DROOP). 1 SCOOP

  10. Thermoelectric Materials By Design: Mechanical Reliability (Agreement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    By Design: Mechanical Reliability (Agreement 14957) Thermoelectric Materials By Design: Mechanical Reliability (Agreement 14957) Presentation from the U.S. DOE Office of Vehicle...

  11. PEEM Thermal Stress and Reliability (Presentation)

    SciTech Connect (OSTI)

    O'Keefe, M. P.

    2007-11-08T23:59:59.000Z

    Advancing power electronics thermal stress and reliability is a critical factor in power electronics equipment. NREL aims to improve thermal stress and reliability of power electronics technologies.

  12. Recommendations to Address Power Reliability Concerns Raised...

    Energy Savers [EERE]

    Reliability Concerns Raised as a Result of Pending Environmental Regulations for Electric Generation Stations Recommendations to Address Power Reliability Concerns Raised as a...

  13. Sandia National Laboratories: photovoltaic plant reliability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    photovoltaic plant reliability Sandia-Electric Power Research Institute Partnership Publishes Photovoltaic Reliability Report On January 21, 2014, in Energy, Facilities, Grid...

  14. Sandia National Laboratories: national reliability database

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    national reliability database Third Annual Continuous Reliability Enhancement for Wind (CREW) Database Report Now Available On October 17, 2013, in Energy, News, News & Events,...

  15. Smart Grid Investments Improve Grid Reliability, Resilience,...

    Office of Environmental Management (EM)

    Investments Improve Grid Reliability, Resilience, and Storm Responses (November 2014) Smart Grid Investments Improve Grid Reliability, Resilience, and Storm Responses (November...

  16. Improving central heating plant performance at the defense construction supply center (DCSC): Advanced operation and maintenance methods. Final report

    SciTech Connect (OSTI)

    Savoie, M.J.; Standerfer, J.; Schmidt, C.M.; Gostich, J.; Mignacca, J.

    1994-11-01T23:59:59.000Z

    A 1987 air pollution emissions test done by the U.S. Army Environmental Hygiene Agency (USAEHA) identified several problems with the central heating plant (CHP) at the Defense Construction Supply Center (DCSC), Columbus, OH. Though DCSC repaired the specified problems, improved coal specifications, and tried to reduce air infiltration, CHP performance remained at unacceptable levels. Consequently, DCSC contracted the U.S. Army Construction Engineering Research Laboratories (USACERL) to apply advanced operation and maintenance procedures to improve its combustion system. This study employed a system-wide approach to evaluate the CHP 5 fuel storage, combustion, heat distribution, and the control of air emissions. Many short-term improvements to the CHP were identified and tested. Subsequent combustion and air emissions tests revealed that the recommended improvements successfully increased CHP efficiency. Long-term improvements were also recommended to help maintain the short-term improvements.

  17. Estimation of All-Terminal Network Reliability Using an Artificial Neural Network Chat Srivaree-ratana and Alice E. Smith

    E-Print Network [OSTI]

    Smith, Alice E.

    Estimation of All-Terminal Network Reliability Using an Artificial Neural Network Chat Srivaree be forwarded) Submitted to Computers & Operations Research June 1999 #12;1 Estimation of All-Terminal Network or communications network topologies, a common reliability measure is all-terminal reliability, the probability

  18. Short-Term Load Forecasting This paper discusses the state of the art in short-term load fore-

    E-Print Network [OSTI]

    Gross, George

    spectrum of time intervals. In therange of seconds, when load variationsare small and random, the automatic by a number of generation control functions such as hydro scheduling, unit commitment, hydro-ther- mal present, functions such as fuel, hydro, and maintenance scheduling are performed to ensure that the load

  19. Ris-R-1235(EN) Reliability Databases

    E-Print Network [OSTI]

    .1 ISO standard: Gas and Oil - Collection of Reliability and Maintenance Data for Equipment 17 5.2 EDF standard for collection of reliability and maintenance data for equipment (also called MCD ­ Mode et Cause judgements on new equipment reliability parameters or using standard values or standard reliability models (e

  20. Assessing Reliability in Energy Supply Systems

    E-Print Network [OSTI]

    McCarthy, Ryan; Ogden, Joan M.; Sperling, Dan

    2008-01-01T23:59:59.000Z

    total of 15 metrics. Pathway reliability General objectives Adequacy Security Functional zones Primary energy supply

  1. Assessing reliability in energy supply systems

    E-Print Network [OSTI]

    McCarthy, Ryan W.; Ogden, Joan M.; Sperling, Daniel

    2007-01-01T23:59:59.000Z

    total of 15 metrics. Pathway reliability General objectives Adequacy Security Functional zones Primary energy supply

  2. The design of a reliable reputation system

    E-Print Network [OSTI]

    Swamynathan, Gayatri; Almeroth, Kevin C.; Zhao, Ben Y.

    2010-01-01T23:59:59.000Z

    reliability by spreading its transactions evenly across all 20 peers in the system (shown by Distribution

  3. Photovoltaic performance and reliability workshop

    SciTech Connect (OSTI)

    Kroposki, B.

    1996-10-01T23:59:59.000Z

    This proceedings is the compilation of papers presented at the ninth PV Performance and Reliability Workshop held at the Sheraton Denver West Hotel on September 4--6, 1996. This years workshop included presentations from 25 speakers and had over 100 attendees. All of the presentations that were given are included in this proceedings. Topics of the papers included: defining service lifetime and developing models for PV module lifetime; examining and determining failure and degradation mechanisms in PV modules; combining IEEE/IEC/UL testing procedures; AC module performance and reliability testing; inverter reliability/qualification testing; standardization of utility interconnect requirements for PV systems; need activities to separate variables by testing individual components of PV systems (e.g. cells, modules, batteries, inverters,charge controllers) for individual reliability and then test them in actual system configurations; more results reported from field experience on modules, inverters, batteries, and charge controllers from field deployed PV systems; and system certification and standardized testing for stand-alone and grid-tied systems.

  4. Wind turbine reliability database update.

    SciTech Connect (OSTI)

    Peters, Valerie A.; Hill, Roger Ray; Stinebaugh, Jennifer A.; Veers, Paul S.

    2009-03-01T23:59:59.000Z

    This report documents the status of the Sandia National Laboratories' Wind Plant Reliability Database. Included in this report are updates on the form and contents of the Database, which stems from a fivestep process of data partnerships, data definition and transfer, data formatting and normalization, analysis, and reporting. Selected observations are also reported.

  5. FIELD RELIABILITY OF ELECTRONIC SYSTEMS

    E-Print Network [OSTI]

    study of in-the-field experience of electronics reliability. Tage Elm. Abstract. This report and internally) induced failures. The report is not meant to be merely an indication of the state of the art for the re- liability prediction methods we know, but also as a contribution to the investigation of man-machine

  6. Reliability and Maintainability Issues for the Next Linear Collider

    SciTech Connect (OSTI)

    Wilson, Zane J.; Gold, Saul L.; Koontz, Ron F.; Lavine, Ted L.; /SLAC

    2011-08-26T23:59:59.000Z

    Large accelerators for high energy physics research traditionally have been designed using informal best design, engineering, and management practices to achieve acceptable levels of operational availability. However, the Next Linear Collider(NLC) project presents a particular challenge for operational availability due to the unprecedented size and complexity of the accelerator systems required to achieve the physics goals of high center-of-mass energy and high luminosity. Formal reliability and maintainability analysis, design, and implementation will be required to achieve acceptable operational availability for the high energy physics research program. This paper introduces some of the basic concepts of reliability analysis and applies them to the 2.6-cm microwave power system of the two 10-km-long, 250-GeV linacs that are currently proposed for the NLC design.

  7. Using wind plant data to increase reliability.

    SciTech Connect (OSTI)

    Peters, Valerie A. (Sandia National Laboratories, Livermore, CA); Ogilvie, Alistair B.; McKenney, Bridget L.

    2011-01-01T23:59:59.000Z

    Operators interested in improving reliability should begin with a focus on the performance of the wind plant as a whole. To then understand the factors which drive individual turbine performance, which together comprise the plant performance, it is necessary to track a number of key indicators. Analysis of these key indicators can reveal the type, frequency, and cause of failures and will also identify their contributions to overall plant performance. The ideal approach to using data to drive good decisions includes first determining which critical decisions can be based on data. When those required decisions are understood, then the analysis required to inform those decisions can be identified, and finally the data to be collected in support of those analyses can be determined. Once equipped with high-quality data and analysis capabilities, the key steps to data-based decision making for reliability improvements are to isolate possible improvements, select the improvements with largest return on investment (ROI), implement the selected improvements, and finally to track their impact.

  8. Human Reliability Analysis for Digital Human-Machine Interfaces

    SciTech Connect (OSTI)

    Ronald L. Boring

    2014-06-01T23:59:59.000Z

    This paper addresses the fact that existing human reliability analysis (HRA) methods do not provide guidance on digital human-machine interfaces (HMIs). Digital HMIs are becoming ubiquitous in nuclear power operations, whether through control room modernization or new-build control rooms. Legacy analog technologies like instrumentation and control (I&C) systems are costly to support, and vendors no longer develop or support analog technology, which is considered technologically obsolete. Yet, despite the inevitability of digital HMI, no current HRA method provides guidance on how to treat human reliability considerations for digital technologies.

  9. ERTP: Energy-Efficient and Reliable Transport Protocol for Data Streaming in Wireless Sensor

    E-Print Network [OSTI]

    New South Wales, University of

    ERTP: Energy-Efficient and Reliable Transport Protocol for Data Streaming in Wireless Sensor applications in Wireless Sensor Networks require re- liable and energy-efficient transport protocols [17] [18 of minutes or hours), energy-efficiency is. Long-term operation and reliable delivery of the sensed data

  10. Optimal Technology Selection and Operation of Microgrids in Commercial Buildings

    E-Print Network [OSTI]

    Marnay, Chris; Venkataramanan, Giri; Stadler, Michael; Siddiqui, Afzal; Firestone, Ryan; Chandran, Bala

    2008-01-01T23:59:59.000Z

    L ABORATORY Optimal Technology Selection and Operation ofEnvironmental Energy Technologies Division 15 January 2007for Electric Reliability Technology Solutions with funding

  11. Radioisotope thermoelectric generator reliability and safety

    SciTech Connect (OSTI)

    Campbell, R.; Klein, J.

    1989-01-01T23:59:59.000Z

    There are numerous occasions when a planetary mission requires energy in remote areas of the solar system. Anytime power is required much beyond Mars or the Asteroid Belts, solar power is not an option. The radioisotope thermoelectric generator (RTG) was developed for such a mission requirement. It is a relatively small and lightweight power source that can produce power under adverse conditions. Just this type of source has become the backbone of the power system for far outer plant exploration. Voyagers I and II are utilizing RTGs, which will soon power the Galileo spacecraft to Jupiter and the Ulysses spacecraft to study the solar poles. The paper discusses RTG operation including thermoelectric design, converter design, general-purpose heat source; RTG reliability including design, testing, experience, and launch approval; and RTG safety issues and methods of ensuring safety.

  12. Wind Power Reliability: Breaking Down a Barrier

    Broader source: Energy.gov [DOE]

    The steady increase of wind power on the grid presents new challenges for power system operators charged with making sure the grid stays up and running. "We need to ensure that we are going down a path that will lead to better reliability [with wind power]," said Bob Zavadil, an executive vice president at EnerNex Corporation in Knoxville, Tenn., a firm specializing in renewable energy grid interconnection and integration. "If this piece isn't done, there will be problems." EnerNex has spent the last decade perfecting wind turbine and plant models that test a wind plant's influence on the grid and its ability to provide grid support. In its latest effort, the company is using American Recovery and Reinvestment Act funds worth $750,000 to develop documentation and validations of computer wind turbine models.

  13. Human Reliability Analysis for Small Modular Reactors

    SciTech Connect (OSTI)

    Ronald L. Boring; David I. Gertman

    2012-06-01T23:59:59.000Z

    Because no human reliability analysis (HRA) method was specifically developed for small modular reactors (SMRs), the application of any current HRA method to SMRs represents tradeoffs. A first- generation HRA method like THERP provides clearly defined activity types, but these activity types do not map to the human-system interface or concept of operations confronting SMR operators. A second- generation HRA method like ATHEANA is flexible enough to be used for SMR applications, but there is currently insufficient guidance for the analyst, requiring considerably more first-of-a-kind analyses and extensive SMR expertise in order to complete a quality HRA. Although no current HRA method is optimized to SMRs, it is possible to use existing HRA methods to identify errors, incorporate them as human failure events in the probabilistic risk assessment (PRA), and quantify them. In this paper, we provided preliminary guidance to assist the human reliability analyst and reviewer in understanding how to apply current HRA methods to the domain of SMRs. While it is possible to perform a satisfactory HRA using existing HRA methods, ultimately it is desirable to formally incorporate SMR considerations into the methods. This may require the development of new HRA methods. More practicably, existing methods need to be adapted to incorporate SMRs. Such adaptations may take the form of guidance on the complex mapping between conventional light water reactors and small modular reactors. While many behaviors and activities are shared between current plants and SMRs, the methods must adapt if they are to perform a valid and accurate analysis of plant personnel performance in SMRs.

  14. Estimation of the reliability of heterolasers subjected to ageing under irradiation by a fast particle flux

    SciTech Connect (OSTI)

    Bogatov, Alexandr P; Kochetkov, A A; Konyaev, V P

    2011-02-28T23:59:59.000Z

    Relations for estimating the reliability of heterolasers operating under irradiation conditions are calculated based on the probabilistic analysis. The accumulation of defects in their active regions is considered to be the physical cause of their failure. (lasers)

  15. Service reliability measurement framework using smart card data : application to the London Underground

    E-Print Network [OSTI]

    Uniman, David Louis

    2009-01-01T23:59:59.000Z

    Service reliability is an important dimension of performance to transit passengers, affecting not only their perceptions of service quality, but their travel behaviour as well. The ability of transit operators to understand ...

  16. Estimation of the reliability of space nuclear power systems by probabilistic risk assessment techniques 

    E-Print Network [OSTI]

    Gutner, Sophie Isabelle

    1996-01-01T23:59:59.000Z

    A successful space mission depends on the reliable operation of the spacecraft's electrical power system. For payloads requiring high power levels, various designs of space nuclear power systems (SNPS) are available. Designers have conducted limited...

  17. SUBMITTED TO IEEE TRANSACTIONS ON POWER SYSTEMS, FEBRUARY 2002 1 Quantifying Transmission Reliability Margin

    E-Print Network [OSTI]

    SUBMITTED TO IEEE TRANSACTIONS ON POWER SYSTEMS, FEBRUARY 2002 1 Quantifying Transmission, power transmission reliability, power system security, power system availability I. Introduction Bulk power transfer capability computations have many uses in electric power system operation and planning

  18. Measuring journey time reliability in London using automated data collection systems

    E-Print Network [OSTI]

    Schil, Mickaël (Mickaël René Jerôme)

    2012-01-01T23:59:59.000Z

    Service reliability is critical for both users and operators of transit systems. The rapid spread of Automated Data Collection Systems, such as Automated Fare Collection (AFC) and Automatic Vehicle Location (AVL), provides ...

  19. Gearbox Reliability Collaborative Bearing Calibration

    SciTech Connect (OSTI)

    van Dam, J.

    2011-10-01T23:59:59.000Z

    NREL has initiated the Gearbox Reliability Collaborative (GRC) to investigate the root cause of the low wind turbine gearbox reliability. The GRC follows a multi-pronged approach based on a collaborative of manufacturers, owners, researchers and consultants. The project combines analysis, field testing, dynamometer testing, condition monitoring, and the development and population of a gearbox failure database. At the core of the project are two 750kW gearboxes that have been redesigned and rebuilt so that they are representative of the multi-megawatt gearbox topology currently used in the industry. These gearboxes are heavily instrumented and are tested in the field and on the dynamometer. This report discusses the bearing calibrations of the gearboxes.

  20. Power Reliability at BASF Corporation

    E-Print Network [OSTI]

    Theising, T. R.

    2011-01-01T23:59:59.000Z

    Power Reliability at BASF Corporation Thomas R. Theising Energy Systems Manager BASF Corporation ABSTRACT: Quality is defined not as what the supplier puts into the product but what the customer gets out and is willing to pay for. Power.... INTRODUCTION: BASF often identifies its? power quality by the effects it has on its ability to manufacture products. Improvements are made to remedy the power quality problems either through the elimination of the problems or through some means...

  1. Power Reliability at BASF Corporation

    E-Print Network [OSTI]

    Theising, T. R.

    2012-01-01T23:59:59.000Z

    Power Reliability at BASF Corporation Thomas R. Theising Energy Systems Manager BASF Corporation ABSTRACT: Quality is defined not as what the supplier puts into the product but what the customer gets out and is willing to pay for. Power.... INTRODUCTION: BASF often identifies its? power quality by the effects it has on its ability to manufacture products. Improvements are made to remedy the power quality problems either through the elimination of the problems or through some means...

  2. Microgrids and Heterogeneous Security, Quality, Reliability, and Availability

    E-Print Network [OSTI]

    Marnay, Chris

    2007-01-01T23:59:59.000Z

    and Energy Reliability, Distribution System Integrationand Energy Reliability, Distribution System Integration

  3. Magnet reliability in the Fermilab Main Injector and implications for the ILC

    SciTech Connect (OSTI)

    Tartaglia, M.A.; Blowers, J.; Capista, D.; Harding, D.J.; Kiemschies, O.; Rahimzadeh-Kalaleh, S.; Tompkins, J.C.; /Fermilab

    2007-08-01T23:59:59.000Z

    The International Linear Collider reference design requires over 13000 magnets, of approximately 135 styles, which must operate with very high reliability. The Fermilab Main Injector represents a modern machine with many conventional magnet styles, each of significant quantity, that has now accumulated many hundreds of magnet-years of operation. We review here the performance of the magnets built for this machine, assess their reliability and categorize the failure modes, and discuss implications for reliability of similar magnet styles expected to be used at the ILC.

  4. Chip-Level Electromigration Reliability for Cu Interconnects

    SciTech Connect (OSTI)

    Gall, M.; Oh, C.; Grinshpon, A.; Zolotov, V.; Panda, R.; Demircan, E.; Mueller, J.; Justison, P.; Ramakrishna, K.; Thrasher, S.; Hernandez, R.; Herrick, M.; Fox, R.; Boeck, B.; Kawasaki, H. [Technology Solutions Organization, Freescale Semiconductor (United States); Haznedar, H.; Ku, P. [Sector Quality, Freescale Semiconductor (United States)

    2004-12-08T23:59:59.000Z

    Even after the successful introduction of Cu-based metallization, the electromigration (EM) failure risk has remained one of the most important reliability concerns for most advanced process technologies. Ever increasing operating current densities and the introduction of low-k materials in the backend process scheme are some of the issues that threaten reliable, long-term operation at elevated temperatures. The traditional method of verifying EM reliability only through current density limit checks is proving to be inadequate in general, or quite expensive at the best. A Statistical EM Budgeting (SEB) methodology has been proposed to assess more realistic chip-level EM reliability from the complex statistical distribution of currents in a chip. To be valuable, this approach requires accurate estimation of currents for all interconnect segments in a chip. However, no efficient technique to manage the complexity of such a task for very large chip designs is known. We present an efficient method to estimate currents exhaustively for all interconnects in a chip. The proposed method uses pre-characterization of cells and macros, and steps to identify and filter out symmetrically bi-directional interconnects. We illustrate the strength of the proposed approach using a high-performance microprocessor design for embedded applications as a case study.

  5. Comparison of reliability performance of group connected and conventional HVDC transmission systems

    SciTech Connect (OSTI)

    Kuruganty, S. [Univ. of North Dakota, Grand Forks, ND (United States). Dept. of Electrical Engineering] [Univ. of North Dakota, Grand Forks, ND (United States). Dept. of Electrical Engineering

    1995-10-01T23:59:59.000Z

    A group connected HVDC transmission scheme is a variant of the unit connection where instead of a single generator, a group of generators are directly connected to the converter. Studies conducted in the past indicated that significant cost reduction can be achieved using this scheme. This is mainly due to the elimination of many components which results in considerable capital and operating cost savings to the utility. Concerns regarding the reliability performance of unit connected schemes were raised, however, there has not been a detailed reliability study conducted. This paper addresses the reliability evaluation aspect of a group connected scheme and compares the reliability performance of the group connected scheme with that of the conventional common collector system. Reliability models for both schemes were developed using a hypothetical system model based on the Nelson River system. Practical system component outage data was used to examine the reliability performance of both schemes.

  6. Electric Power Reliability in Chemical Plants

    E-Print Network [OSTI]

    Cross, M. B.

    The quality and reliability of utility-generated electric power is presently receiving a great deal of attention from the chemical and refining industry. What changes have taken place to make electric power reliability a major topic of discussion...

  7. Arnold Schwarzenegger REAL-TIME GRID RELIABILITY

    E-Print Network [OSTI]

    Energy Research (PIER) California Energy Commission Beth Chambers Contract Manager Jamie Patterson (VSA) prototype to monitor system voltage conditions and provide real time dispatchers with reliabilityArnold Schwarzenegger Governor REAL-TIME GRID RELIABILITY MANAGEMENT California ISO Real

  8. Data Communication Principles Reliable Data Transfer

    E-Print Network [OSTI]

    Ramkumar, Mahalingam

    Data Communication Principles Switching Reliable Data Transfer Data Communication Basics Mahalingam Ramkumar Mississippi State University, MS September 8, 2014 Ramkumar CSE 4153 / 6153 #12;Data Communication Principles Switching Reliable Data Transfer 1 Data Communication Principles Data Rate of a Communication

  9. Reliability Analysis of Microelectronic Components and Materials

    E-Print Network [OSTI]

    Berlin,Technische Universität

    1 Reliability Analysis of Microelectronic Components and Materials Increasing numbers on the structural integrity of embedded micro- electronic components and assemblies. Improved knowledge and modeling methods are critical for the reliable use of electronic packages. In particular, since the advent

  10. Electric Power Reliability in Chemical Plants 

    E-Print Network [OSTI]

    Cross, M. B.

    1989-01-01T23:59:59.000Z

    at plants across the country? Has the quality and reliability of utility-generated power deteriorated over the past five or ten years? Or, has the perception of what constitutes reliable power changed with the advent, installation, and increasing usage...

  11. Reliability modeling and evaluation of HVDC power transmission systems

    SciTech Connect (OSTI)

    Dialynas, E.N.; Koskolos, N.C. (National Technical Univ., Athens (Greece). Dept. of Electrical and Computer Engineering)

    1994-04-01T23:59:59.000Z

    The objective of this paper is to present an improved computational method for evaluating the reliability indices of HVdc transmission systems. The developed models and computational techniques are described. These can be used to simulate the operational practices and characteristics of a system under study efficiently and realistically. This method is based on the failure modes and effects analysis and uses the event tree method and the minimal cut set approach to represent the system's operational behavior and deduce the appropriate system's failure modes. A set of five reliability indices is evaluated for each output node being analyzed together with the probability and frequency of encountering particular regions of system performance levels. The analysis of an assumed HVdc bipolar transmission system is also included.

  12. Reliability Challenges for Solar Energy (Presentation)

    SciTech Connect (OSTI)

    Kurtz, S.

    2009-12-08T23:59:59.000Z

    Presentation that reviews reliability issues related to various types of photovoltaic tecnnologies, including crystalline silicon, thin films, and concentrating PV.

  13. LUNAR MASS SPECTROMETER RELIABILITY LOGIC DIAGRAM

    E-Print Network [OSTI]

    Rathbun, Julie A.

    point (A) to (F). The block diagram also defines the reliability functions for the purpose of FMEA 1

  14. Reliability-based casing design

    SciTech Connect (OSTI)

    Maes, M.A. [Univ. of Calgary, Alberta (Canada). Civil Engineering Dept.; Gulati, K.C.; Johnson, R.C. [Mobil Research and Development Corp., Dallas, TX (United States); McKenna, D.L. [Mobil Producing Nigeria, Lagos (Nigeria); Brand, P.R.; Lewis, D.B. [Mobil E and P Technical Center, Dallas, TX (United States)

    1995-06-01T23:59:59.000Z

    The present paper describes the development of reliability-based design criteria for oil and/or gas well casing/tubing. The approach is based on the fundamental principles of limit state design. Limit states for tubulars are discussed and specific techniques for the stochastic modeling of loading and resistance variables are described. Zonation methods and calibration techniques are developed which are geared specifically to the characteristic tubular design for both hydrocarbon drilling and production applications. The application of quantitative risk analysis to the development of risk-consistent design criteria is shown to be a major and necessary step forward in achieving more economic tubular design.

  15. RELIABILITY-BASED CASTING PROCESS DESIGN OPTIMIZATION

    E-Print Network [OSTI]

    Beckermann, Christoph

    RELIABILITY-BASED CASTING PROCESS DESIGN OPTIMIZATION Richard Hardin1 , K.K. Choi1 , and Christoph 52242-1527 Keywords: Casting Process Design, Optimization, Reliability-Based Design Optimization purpose reliability-based design optimization (RBDO) software tool previously developed at the University

  16. Operations & Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations and Maintenance Operations OASIS: OATI (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) Contact Information...

  17. Operations & Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rates Operations & Maintenance Operations OASIS: WACM (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) wesTTrans Common...

  18. Reliability Estimates for Power Supplies

    SciTech Connect (OSTI)

    Lee C. Cadwallader; Peter I. Petersen

    2005-09-01T23:59:59.000Z

    Failure rates for large power supplies at a fusion facility are critical knowledge needed to estimate availability of the facility or to set priorties for repairs and spare components. A study of the "failure to operate on demand" and "failure to continue to operate" failure rates has been performed for the large power supplies at DIII-D, which provide power to the magnet coils, the neutral beam injectors, the electron cyclotron heating systems, and the fast wave systems. When one of the power supplies fails to operate, the research program has to be either temporarily changed or halted. If one of the power supplies for the toroidal or ohmic heating coils fails, the operations have to be suspended or the research is continued at de-rated parameters until a repair is completed. If one of the power supplies used in the auxiliary plasma heating systems fails the research is often temporarily changed until a repair is completed. The power supplies are operated remotely and repairs are only performed when the power supplies are off line, so that failure of a power supply does not cause any risk to personnel. The DIII-D Trouble Report database was used to determine the number of power supply faults (over 1,700 reports), and tokamak annual operations data supplied the number of shots, operating times, and power supply usage for the DIII-D operating campaigns between mid-1987 and 2004. Where possible, these power supply failure rates from DIII-D will be compared to similar work that has been performed for the Joint European Torus equipment. These independent data sets support validation of the fusion-specific failure rate values.

  19. OPTIMAL RELIABILITY ALLOCATION IN SERIES-PARALLEL SYSTEMS FROM COMPONENTS' DISCRETE COST -RELIABILITY DATA SETS

    E-Print Network [OSTI]

    Smith, Alice E.

    is not known. Instead, we consider the more realistic assumption of discrete cost-reliability data sets expressions for cost-reliability curves, we consider discrete cost-reliability data sets for each componentOPTIMAL RELIABILITY ALLOCATION IN SERIES-PARALLEL SYSTEMS FROM COMPONENTS' DISCRETE COST

  20. Software reliability models for critical applications

    SciTech Connect (OSTI)

    Pham, H.; Pham, M.

    1991-12-01T23:59:59.000Z

    This report presents the results of the first phase of the ongoing EG G Idaho, Inc. Software Reliability Research Program. The program is studying the existing software reliability models and proposes a state-of-the-art software reliability model that is relevant to the nuclear reactor control environment. This report consists of three parts: (1) summaries of the literature review of existing software reliability and fault tolerant software reliability models and their related issues, (2) proposed technique for software reliability enhancement, and (3) general discussion and future research. The development of this proposed state-of-the-art software reliability model will be performed in the second place. 407 refs., 4 figs., 2 tabs.

  1. Software reliability models for critical applications

    SciTech Connect (OSTI)

    Pham, H.; Pham, M.

    1991-12-01T23:59:59.000Z

    This report presents the results of the first phase of the ongoing EG&G Idaho, Inc. Software Reliability Research Program. The program is studying the existing software reliability models and proposes a state-of-the-art software reliability model that is relevant to the nuclear reactor control environment. This report consists of three parts: (1) summaries of the literature review of existing software reliability and fault tolerant software reliability models and their related issues, (2) proposed technique for software reliability enhancement, and (3) general discussion and future research. The development of this proposed state-of-the-art software reliability model will be performed in the second place. 407 refs., 4 figs., 2 tabs.

  2. Application of reliability analysis method to fusion component testing

    SciTech Connect (OSTI)

    Ying, A.Y.; Abdou, M.A. [Univ. of California, Los Angeles, CA (United States)

    1994-12-31T23:59:59.000Z

    The term reliability here implies that a component satisfies a set of performance criteria while under specified conditions of use over a specified period of time. For fusion nuclear technology, the reliability goal to be pursued is the development of a mean time between failures (MTBF) for a component which is longer than its lifetime goal. While the component lifetime is mainly determined by the fluence limitation (i.e., damage level) which leads to performance degradation or failure, the MTBF represents an arithmetic average life of all units in a population. One method of assessing the reliability goal involves determining component availability needs to meet the goal plant availability, defining a test-analyze-fix development program to improve component reliability, and quantifying both test times and the number of test articles that would be required to ensure that a specified target MTBF is met. Statistically, constant failure rates and exponential life distributions are assumed for analyses and blanket component development is used as an example. However, as data are collected the probability distribution of the parameter of interest can be updated in a Bayesian fashion. The nuclear component testing program will be structured such that reliability requirements for DEMO can be achieved. The program shall not exclude the practice of a good design (such as reducing the complexity of the system to the minimum essential for the required operation), the execution of high quality manufacturing and inspection processes, and the implication of quality assurance and control for component development. In fact, the assurance of a high quality testing/development program is essential so that there is no question left for reliability.

  3. Electricity Delivery and Energy Reliability | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electricity Delivery and Energy Reliability Electricity Delivery and Energy Reliability information about the delivery of electricity and energy reliability Electricity Delivery...

  4. Microgrids and Heterogeneous Security, Quality, Reliability, and Availability

    E-Print Network [OSTI]

    Marnay, Chris

    2007-01-01T23:59:59.000Z

    quality, reliability, and availability,” IEEE Power & EnergyReliability, and Availability Chris Marnay EnvironmentalQuality, Reliability, and Availability C. Marnay Ernest

  5. Reliable computation of homogeneous azeotropes

    SciTech Connect (OSTI)

    Maier, R.W.; Brennecke, J.F.; Stadtherr, M.A. [Univ. of Notre Dame, IN (United States). Dept. of Chemical Engineering] [Univ. of Notre Dame, IN (United States). Dept. of Chemical Engineering

    1998-08-01T23:59:59.000Z

    It is important to determine the existence and composition of homogeneous azeotropes in the analysis of phase behavior and in the synthesis and design of separation systems, from both theoretical and practical standpoints. A new method for reliably locating any and all homogeneous azeotropes for multicomponent mixtures is presented. The method also verifies the nonexistence of homogeneous azeotropes if none are present. The method is based on interval analysis, in particular an interval-Newton/generalized-bisection-algorithm providing a mathematical and computational guarantee that all azeotropes are located. This general-purpose technique can be applied in connection with any thermodynamic models. The technique is illustrated in several example problems using the Wilson, NRTL, and UNIQUAC activity-coefficient models.

  6. Quantifying transmission reliability margin J. Zhang, I. Dobson*, F.L. Alvarado

    E-Print Network [OSTI]

    Dobson, Ian

    , it is likely that the power system will remain secure despite the uncertainty. The transmission reliability uses in electric power system operation and planning. In the operation of bilateral markets, available capability can be used to assess power system security when local power sources are replaced by imported

  7. Thermomechanical Reliability Investigation of Large Temperature Excursions in Power Electronics Packages

    SciTech Connect (OSTI)

    Ning, Puqi [ORNL; Wang, Fei [ORNL; Ngo, Khai [Virginia Polytechnic Institute and State University (Virginia Tech)

    2011-01-01T23:59:59.000Z

    This study confirms that high stresses between the metallization layer and ceramic lead to significant failures in DBC substrate. The driving forces behind several different failure modes are discussed. Further understanding of these failure mechanisms enables the modules to be engineered for longtime operation and helps to enhance the reliability of system-level operation.

  8. High-performance, high-reliability tape storage for midrange and server-based environments

    E-Print Network [OSTI]

    operations can take advan- tage of lower cost tape storage. With an industry-leading design that enables repetitive handling by automated pickers or human operators, thus protecting the tape from the physical, provide unparalleled time-to-data levels and reliability. Magstar MP Fast Access Linear Tape family

  9. Gearbox Reliability Collaborative Update (Presentation)

    SciTech Connect (OSTI)

    Keller, J.; McDade, M.; LaCava, W.; Guo, Y.; Sheng, S.

    2012-04-01T23:59:59.000Z

    Understand and isolate sources of gearbox failures; Improve understanding of internal loads and response; Normal operation and transients; Improve analysis tools to accurately simulate response; Improve ability to reproduce field response in dyno testing; Evaluate how CM augments design and O and M.

  10. Multi-unit operations considerations.

    SciTech Connect (OSTI)

    Gilmore, Walter E. (Los Alamos National Laboratory, Los Alamos, NM); Bennett, Thomas C. (Lawrence Livermore National Laboratory, Albuquerque, NM); Brannon, Nathan Gregory

    2005-09-01T23:59:59.000Z

    Several nuclear weapons programs have or are pursuing the implementation of multi-unit operations for tasks such as disassembly and inspection, and rebuild. A multi-unit operation is interpreted to mean the execution of nuclear explosive operating procedures in a single facility by two separate teams of technicians. The institution of a multi-unit operations program requires careful consideration of the tools, resources, and environment provided to the technicians carrying out the work. Therefore, a systematic approach is necessary to produce safe, secure, and reliable processes. In order to facilitate development of a more comprehensive multi-unit operations program, the current work details categorized issues that should be addressed prior to the implementation of multi-unit operations in a given weapons program. The issues have been organized into the following categories: local organizational conditions, work process flow/material handling/workplace configuration, ambient environmental conditions, documented safety analysis, and training.

  11. Managing electricity reliability risk through the futures markets

    SciTech Connect (OSTI)

    Siddiqui, Afzal S.

    2000-10-01T23:59:59.000Z

    In competitive electricity markets, the vertically integrated utilities that were responsible for ensuring system reliability in their own service territories, or groups of territories, often cease to exist. Typically, the burden falls to an independent system operator (ISO) to insure that enough ancillary services (AS) are available for safe, stable, and reliable operation of the grid, typically defined, in part, as compliance with officially approved engineering specifications for minimum levels of AS. In order to characterize the behavior of market participants (generators, retailers, and an ISO) in a competitive electricity market with reliability requirements, we model a spot market for electricity and futures markets for both electricity and AS. By assuming that each participant seeks to maximize its expected utility of wealth and that all markets clear, we solve for the optional quantities of electricity and AS traded in each market by all participants, as well as the corresponding market-clearing prices. We show that future prices for both electricity and AS depend on expectations of the spot price, statistical aspects of system demand, and production cost parameters. More important, our model captures the fact that electricity and AS are substitute products for the generators, implying that anticipated changes in the spot market will affect the equilibrium futures positions of both electricity and AS. We apply our model to the California electricity and AS markets to test its viability.

  12. Switchover software reliability estimate for Paducah Freezer/Sublimer computer systems

    SciTech Connect (OSTI)

    Flanagan, D.M.; Davis, J.N.

    1993-04-01T23:59:59.000Z

    K-25 Engineering Division purchased a series of redundant computer systems and developed software for the purpose of providing continuous process monitoring and control for the Freezer/Sublimer equipment in the gaseous diffusion process at the Paducah Gaseous Diffusion Plant. The application software is loaded on two central processing units (CPU) so that in the event of a failure of the primary unit, the processing can switch to the backup unit and continue processing without error. It is the purpose of this document to demonstrate the reliability of this system with respect to its ability to switch properly between redundant CPU. The total reliability estimation problem -- which considers the computer hardware, the operating system software, and the application software -- has been reduced to one that considers only the application software directly involved in the switchover process. Estimates are provided for software reliability and the testing coverage. Software and hardware reliability models and reliability growth models are considered in addition to Bayesian approaches.

  13. Power as a function of reliability

    SciTech Connect (OSTI)

    Abate, M.L. [Sandia National Labs., Albuquerque, NM (United States); McCabe, G.P.; Lynch, M.P. [Purdue Univ., Lafayette, IN (United States)

    1995-10-01T23:59:59.000Z

    Many studies employ multiple measurement instruments such as human raters, observers, judges, or mechanical gauges to record subject data. It is well known that the consistency of these instruments, commonly called rater reliability, limits the extent to which conclusions should be drawn from the observed data. However, the degree to which rater reliability limits conclusions has traditionally been assessed in only subjective manners. In this paper, a method is developed for objectively quantifying the impact of rate reliability on the statistical analysis of data from a commonly used collection scheme. This method allows the inclusion of a reliability index in statistical power calculations and is an invaluable tool in the planning of experiments.

  14. General Order Ensuring Reliable Electric Service (Louisiana)

    Broader source: Energy.gov [DOE]

    The standards set forth herein have been developed to provide consumers, the Louisiana Public Service Commission, and jurisdictional electric utilities with a uniform method of ensuring reliable...

  15. Thermoelectric Materials By Design: Mechanical Reliability (Agreement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    enable improvements in TE device design, optimization, and maximum reliability. * Next year will involve: - Continued TE material database generation. - TE modeling and...

  16. Improving Wind Turbine Gearbox Reliability: Preprint

    SciTech Connect (OSTI)

    Musial, W.; Butterfield, S.; McNiff, B.

    2007-06-01T23:59:59.000Z

    This paper describes a new research and development initiative to improve gearbox reliability in wind turbines begun at the National Renewable Energy Laboratory (NREL) in Golden, Colorado, USA.

  17. RTI International Develops SSL Luminaire Reliability Model |...

    Broader source: Energy.gov (indexed) [DOE]

    is developing and validating accelerated life testing (ALT) methodologies and a reliability model for predicting the lifetime of integrated solid-state lighting...

  18. Electricity Delivery and Energy Reliability PROGRAM DESCRIPTION

    Broader source: Energy.gov (indexed) [DOE]

    (PSA) program provides expert technical assistance to states, tribes and regions on electricity policies, programs and market mechanisms that increase access to reliable,...

  19. Sandia National Laboratories: Inverter Reliablity Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    simulations to look for corresponding changes in behavioral parameters of ... Inverter Reliability Program On December 18, 2012, in As scientists and engineers improve the...

  20. Sandia National Laboratories: PV Systems Reliability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    fluid phenomena of internal inverter components, and their impact on ... Inverter Reliability Program On December 18, 2012, in As scientists and engineers improve the...

  1. NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance...

    Office of Environmental Management (EM)

    Preliminary Disturbance Report The following information represents a partial sequence of events based upon Reliability Coordinator information available to NERC. It is not...

  2. Sandia Energy - Continuous Reliability Enhancement for Wind ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Enhancement for Wind (CREW): Project Update Home Renewable Energy Energy News Wind Energy News & Events Systems Analysis Continuous Reliability Enhancement for Wind (CREW):...

  3. Comments of North American Electric Reliability Corporation ...

    Broader source: Energy.gov (indexed) [DOE]

    currently developing a report, entitled "Reliability Consideration from Integration of Smart Grid" that will address many of the issues raised in the DOE RFI. North American...

  4. Sandia National Laboratories: Materials & Manufacturing Reliability...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Materials & Manufacturing Reliability Program Biofouling Studies on Sandia's Marine Hydrokinetic Coatings Initiated at PNNL's Sequim Bay On June 26, 2014, in Energy, Materials...

  5. Competition and Reliability in North American Electricity Markets...

    Energy Savers [EERE]

    Electricity Markets Technical Workshop Competition and Reliability in North American Electricity Markets Technical Workshop Competition and Reliability in North American...

  6. PV Performance and Reliability Validation Capabilities at Sandia...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance and Reliability Validation Capabilities at Sandia National Laboratories PV Performance and Reliability Validation Capabilities at Sandia National Laboratories This...

  7. Evaluation of MHTGR fuel reliability

    SciTech Connect (OSTI)

    Wichner, R.P. [Oak Ridge National Lab., TN (United States); Barthold, W.P. [Barthold Associates, Inc., Knoxville, TN (United States)

    1992-07-01T23:59:59.000Z

    Modular High-Temperature Gas-Cooled Reactor (MHTGR) concepts that house the reactor vessel in a tight but unsealed reactor building place heightened importance on the reliability of the fuel particle coatings as fission product barriers. Though accident consequence analyses continue to show favorable results, the increased dependence on one type of barrier, in addition to a number of other factors, has caused the Nuclear Regulatory Commission (NRC) to consider conservative assumptions regarding fuel behavior. For this purpose, the concept termed ``weak fuel`` has been proposed on an interim basis. ``Weak fuel`` is a penalty imposed on consequence analyses whereby the fuel is assumed to respond less favorably to environmental conditions than predicted by behavioral models. The rationale for adopting this penalty, as well as conditions that would permit its reduction or elimination, are examined in this report. The evaluation includes an examination of possible fuel-manufacturing defects, quality-control procedures for defect detection, and the mechanisms by which fuel defects may lead to failure.

  8. Reliability estimates for selected sensors in fusion applications

    SciTech Connect (OSTI)

    Cadwallader, L.C.

    1996-09-01T23:59:59.000Z

    This report presents the results of a study to define several types of sensors in use, the qualitative reliability (failure modes) and quantitative reliability (average failure rates) for these types of process sensors. Temperature, pressure, flow, and level sensors are discussed for water coolant and for cryogenic coolants. The failure rates that have been found are useful for risk assessment and safety analysis. Repair times and calibration intervals are also given when found in the literature. All of these values can also be useful to plant operators and maintenance personnel. Designers may be able to make use of these data when planning systems. The final chapter in this report discusses failure rates for several types of personnel safety sensors, including ionizing radiation monitors, toxic and combustible gas detectors, humidity sensors, and magnetic field sensors. These data could be useful to industrial hygienists and other safety professionals when designing or auditing for personnel safety.

  9. Issues in benchmarking human reliability analysis methods : a literature review.

    SciTech Connect (OSTI)

    Lois, Erasmia (US Nuclear Regulatory Commission); Forester, John Alan; Tran, Tuan Q. (Idaho National Laboratory, Idaho Falls, ID); Hendrickson, Stacey M. Langfitt; Boring, Ronald L. (Idaho National Laboratory, Idaho Falls, ID)

    2008-04-01T23:59:59.000Z

    There is a diversity of human reliability analysis (HRA) methods available for use in assessing human performance within probabilistic risk assessment (PRA). Due to the significant differences in the methods, including the scope, approach, and underlying models, there is a need for an empirical comparison investigating the validity and reliability of the methods. To accomplish this empirical comparison, a benchmarking study is currently underway that compares HRA methods with each other and against operator performance in simulator studies. In order to account for as many effects as possible in the construction of this benchmarking study, a literature review was conducted, reviewing past benchmarking studies in the areas of psychology and risk assessment. A number of lessons learned through these studies are presented in order to aid in the design of future HRA benchmarking endeavors.

  10. Reliability analysis for wind turbines with incomplete failure data collected from after the date of initial installation

    E-Print Network [OSTI]

    McCalley, James D.

    Reliability analysis for wind turbines with incomplete failure data collected from after the date model Maximum likelihood Least squares Wind turbines a b s t r a c t Reliability has an impact on wind analysis. In wind energy industry, wind farm operators have greater interest in recording wind turbine

  11. Development of Characterization Tools for Reliability Testing of MicroElectroMechanical System Actuators

    SciTech Connect (OSTI)

    Allen, James J.; Eaton, William P.; Smith, Norman F.; Tanner, Danelle M.

    1999-07-26T23:59:59.000Z

    Characterization tools have been developed to study the performance characteristics and reliability of surface micromachined actuators. These tools include (1) the ability to electrically stimulate or stress the actuator, (2) the capability to visually inspect the devices in operation, (3) a method for capturing operational information, and (4) a method to extract performance characteristics from the operational information. Additionally, a novel test structure has been developed to measure electrostatic forces developed by a comb drive actuator.

  12. Wind energy Computerized Maintenance Management System (CMMS) : data collection recommendations for reliability analysis.

    SciTech Connect (OSTI)

    Peters, Valerie A.; Ogilvie, Alistair B.

    2012-01-01T23:59:59.000Z

    This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific data recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of operating wind turbines. This report is intended to help develop a basic understanding of the data needed for reliability analysis from a Computerized Maintenance Management System (CMMS) and other data systems. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and analysis and reporting needs. The 'Motivation' section of this report provides a rationale for collecting and analyzing field data for reliability analysis. The benefits of this type of effort can include increased energy delivered, decreased operating costs, enhanced preventive maintenance schedules, solutions to issues with the largest payback, and identification of early failure indicators.

  13. Software Reliability Cases: The Bridge Between Hardware, Software and System Safety and Reliability

    SciTech Connect (OSTI)

    Herrmann, D.S.; Peercy, D.E.

    1999-01-08T23:59:59.000Z

    High integrity/high consequence systems must be safe and reliable; hence it is only logical that both software safety and software reliability cases should be developed. Risk assessments in safety cases evaluate the severity of the consequences of a hazard and the likelihood of it occurring. The likelihood is directly related to system and software reliability predictions. Software reliability cases, as promoted by SAE JA 1002 and 1003, provide a practical approach to bridge the gap between hardware reliability, software reliability, and system safety and reliability by using a common methodology and information structure. They also facilitate early insight into whether or not a project is on track for meeting stated safety and reliability goals, while facilitating an informed assessment by regulatory and/or contractual authorities.

  14. Fundamental mechanisms of micromachine reliability

    SciTech Connect (OSTI)

    DE BOER,MAARTEN P.; SNIEGOWSKI,JEFFRY J.; KNAPP,JAMES A.; REDMOND,JAMES M.; MICHALSKE,TERRY A.; MAYER,THOMAS K.

    2000-01-01T23:59:59.000Z

    Due to extreme surface to volume ratios, adhesion and friction are critical properties for reliability of Microelectromechanical Systems (MEMS), but are not well understood. In this LDRD the authors established test structures, metrology and numerical modeling to conduct studies on adhesion and friction in MEMS. They then concentrated on measuring the effect of environment on MEMS adhesion. Polycrystalline silicon (polysilicon) is the primary material of interest in MEMS because of its integrated circuit process compatibility, low stress, high strength and conformal deposition nature. A plethora of useful micromachined device concepts have been demonstrated using Sandia National Laboratories' sophisticated in-house capabilities. One drawback to polysilicon is that in air the surface oxidizes, is high energy and is hydrophilic (i.e., it wets easily). This can lead to catastrophic failure because surface forces can cause MEMS parts that are brought into contact to adhere rather than perform their intended function. A fundamental concern is how environmental constituents such as water will affect adhesion energies in MEMS. The authors first demonstrated an accurate method to measure adhesion as reported in Chapter 1. In Chapter 2 through 5, they then studied the effect of water on adhesion depending on the surface condition (hydrophilic or hydrophobic). As described in Chapter 2, they find that adhesion energy of hydrophilic MEMS surfaces is high and increases exponentially with relative humidity (RH). Surface roughness is the controlling mechanism for this relationship. Adhesion can be reduced by several orders of magnitude by silane coupling agents applied via solution processing. They decrease the surface energy and render the surface hydrophobic (i.e. does not wet easily). However, only a molecular monolayer coats the surface. In Chapters 3-5 the authors map out the extent to which the monolayer reduces adhesion versus RH. They find that adhesion is independent of RH up to a threshold value, depending on the coating chemistry. The mechanism for the adhesion increase beyond this threshold value is that the coupling agent reconfigures from a surface to a bulk phase (Chapter 3). To investigate the details of how the adhesion increase occurs, the authors developed the mechanics for adhesion hysteresis measurements. These revealed that near-crack tip compression is the underlying cause of the adhesion increase (Chapter 4). A vacuum deposition chamber for silane coupling agent deposition was constructed. Results indicate that vapor deposited coatings are less susceptible to degradation at high RH (Chapter 5). To address issues relating to surfaces in relative motion, a new test structure to measure friction was developed. In contrast to other surface micromachined friction test structures, uniform apparent pressure is applied in the frictional contact zone (Chapter 6). The test structure will enable friction studies over a large pressure and dynamic range. In this LDRD project, the authors established an infrastructure for MEMS adhesion and friction metrology. They then characterized in detail the performance of hydrophilic and hydrophobic films under humid conditions, and determined mechanisms which limit this performance. These studies contribute to a fundamental understanding for MEMS reliability design rules. They also provide valuable data for MEMS packaging requirements.

  15. Demand Response and Electric Grid Reliability

    E-Print Network [OSTI]

    Wattles, P.

    2012-01-01T23:59:59.000Z

    Demand Response and Electric Grid Reliability Paul Wattles Senior Analyst, Market Design & Development, ERCOT CATEE Conference, Galveston October 10, 2012 2 North American Bulk Power Grids CATEE Conference October 10, 2012 ? The ERCOT... adequacy ? ?Achieving more DR participation would . . . displace some generation investments, but would achieve the same level of reliability... ? ?Achieving this ideal requires widespread demand response and market structures that enable loads...

  16. Wind Energy Facility Reliability and Maintenance

    E-Print Network [OSTI]

    Ding, Yu

    Wind Energy Facility Reliability and Maintenance Eunshin Byon, Lewis Ntaimo, Chanan Singh and Yu related to wind energy facility reliability and mainte- nance focused more on qualitative aspects. In this chapter, we provide a comprehensive account of the existing research regarding wind energy facility

  17. Probabilistic Reliable Message Transmission Subodh Kumar

    E-Print Network [OSTI]

    North Carolina at Chapel Hill, University of

    Probabilistic Reliable Message Transmission Subodh Kumar January 17, 1996 Abstract Most communication systems require reliable transmission of a sequence of messages over a physical network which can with messages by the sender and they are acknowledged by the receiver. It is known that protocols that use

  18. Advances in Safety, Reliability and Risk Management -Proceedings of the European Safety and Reliability Conference, ESREL 2011 -European Safety and Reliability Conference: Advances in Safety, Reliability and

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Advances in Safety, Reliability and Risk Management - Proceedings of the European Safety, Reliability and Risk Management, ESREL 2011, Troyes : France (2011) In France, more than 99% of failed is global risk management. This allows analysis of the major risks faced by the busi- ness (loss

  19. Engineering Reliability into Web Sites: Google SRE

    E-Print Network [OSTI]

    Tomkins, Andrew

    Engineering Reliability into Web Sites: Google SRE Alex Perry alex.perry@google.com Santa Monica SRE, Google #12;Abstract This talk introduces Site Reliability Engineering (SRE) at Google, explaining team responsibilities by site Failures and instability consuming manpower Engineering being applied

  20. NISTIR 7817 A Credential Reliability and

    E-Print Network [OSTI]

    NISTIR 7817 A Credential Reliability and Revocation Model for Federated Identities Hildegard Ferraiolo http://dx.doi.org/10.6028/NIST.IR.7817 #12;NISTIR 7817 A Credential Reliability and Revocation Interagency Report 7817 22 pages (Nov. 2012) Certain commercial entities, equipment, or materials may

  1. Reliable Distributed Computing for Decision Support Systems

    E-Print Network [OSTI]

    Bargiela, Andrzej

    Reliable Distributed Computing for Decision Support Systems Taha Osman, Andrzej Bargiela Department of application tasks on the currently avail- able computing nodes. Distributed Systems Reliability Due decision-support systems such as water distribution net- works, involving hundreds or even thousands

  2. Reliability of underwater hearing thresholds in pinnipeds

    E-Print Network [OSTI]

    Reichmuth, Colleen

    Reliability of underwater hearing thresholds in pinnipeds Brandon L. Southall Long Marine and certain testing parameters (e.g., equipment and research personnel), measured underwater hearing (0.2­6.4 kHz). These data address the reliability of acoustic signal detection measurements over time

  3. NREL's Gearbox Reliability Collaborative leads to wind turbine gearbox reliability, lowering the cost of energy.

    E-Print Network [OSTI]

    the cost of energy. Unintended gearbox failures have a significant impact on the cost of wind farm will result in increased gearbox reliability and an overall reduction in the cost of wind energy. ProjectNREL's Gearbox Reliability Collaborative leads to wind turbine gearbox reliability, lowering

  4. Reliability Testing of Polysilicon For MEMs Devices

    SciTech Connect (OSTI)

    LaVan, D.A.; Buchheit, T.E.

    1999-04-05T23:59:59.000Z

    Mission critical applications of MEMS devices require knowledge of the distribution in their material properties and long-term reliability of the small-scale structures. This project reports on a new testing program at Sandia to quantify the strength distribution using samples that reflect the dimensions of critical MEMS components. The strength of polysilicon fabricated with Sandia's SUMMiT 4-layer process was successfully measured using samples with gage sections 2.5 {micro}m thick by 1.7 {micro}m wide and lengths of 15 and 25 {micro}m. These tensile specimens have a freely moving pivot on one end that anchors the sample to the silicon die and prevents off axis loading during testing. Each sample is loaded in uniaxial tension by pulling laterally with a flat tipped diamond in a computer-controlled Nanoindenter. The stress-strain curve is calculated using the specimen cross section and gage length dimensions verified by measuring against a standard in the SEM. The first 48 samples had a means strength of 2.24 {+-} 0.35 GPa. Fracture strength measurements grouped into three strength levels, which matched three failure modes observed in post mortem examinations. The seven samples in the highest strength group failed in the gage section (strength of 2.77 {+-} 0.04 GPa), the moderate strength group failed at the gage section fillet and the lowest strength group failed at a dimple in the hub. With this technique, multiple tests can be programmed at one time and performed without operator assistance at a rate of 20-30 per day allowing the collection of significant populations of data. Since the new test geometry has been proven, the project is moving to test the distributions seen from real geometric features typical to MEMS such as the effect of gage length, fracture toughness, bonding between layers, etch holes, dimples and shear of gear teeth.

  5. Effect of Heat and Electricity Storage and Reliability on Microgrid Viability: A Study of Commercial Buildings in California and New York States

    E-Print Network [OSTI]

    Stadler, Michael

    2009-01-01T23:59:59.000Z

    vs. Short-Term Energy Storage Technologies Analysis, A Life-Storage Technologies”, ACEEE 2008 Summer Study on EnergyStorage Technologies on Microgrid Viability The Distributed Energy

  6. Blade reliability collaborative : collection of defect, damage and repair data.

    SciTech Connect (OSTI)

    Ashwill, Thomas D.; Ogilvie, Alistair B.; Paquette, Joshua A.

    2013-04-01T23:59:59.000Z

    The Blade Reliability Collaborative (BRC) was started by the Wind Energy Technologies Department of Sandia National Laboratories and DOE in 2010 with the goal of gaining insight into planned and unplanned O&M issues associated with wind turbine blades. A significant part of BRC is the Blade Defect, Damage and Repair Survey task, which will gather data from blade manufacturers, service companies, operators and prior studies to determine details about the largest sources of blade unreliability. This report summarizes the initial findings from this work.

  7. NREL Collaborative Improves the Reliability of Wind Turbine Gearboxes (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-09-01T23:59:59.000Z

    Gearbox failures have a significant impact on the cost of wind farm operations. To help minimize gearbox failures, in 2007 the National Renewable Energy Laboratory (NREL) initiated the Gearbox Reliability Collaborative (GRC), which consists of manufacturers, owners, researchers, and consultants. Based on all the lessons learned from the past five years, the GRC has now produced a new and improved design, which is projected to yield an operating lifetime of 12 years, more than triple that of the previous redesigned gearbox. The GRC findings will result in increased gearbox reliability and an overall reduction in the cost of wind energy.

  8. Gearbox Reliability Collaborative Phase 3 Gearbox 2 Test Plan

    SciTech Connect (OSTI)

    Link, H.; Keller, J.; Guo, Y.; McNiff, B.

    2013-04-01T23:59:59.000Z

    Gearboxes in wind turbines have not been achieving their expected design life even though they commonly meet or exceed the design criteria specified in current design standards. One of the basic premises of the National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) is that the low gearbox reliability results from the absence of critical elements in the design process or insufficient design tools. Key goals of the GRC are to improve design approaches and analysis tools and to recommend practices and test methods resulting in improved design standards for wind turbine gearboxes that lower the cost of energy (COE) through improved reliability. The GRC uses a combined gearbox testing, modeling and analysis approach, along with a database of information from gearbox failures collected from overhauls and investigation of gearbox condition monitoring techniques to improve wind turbine operations and maintenance practices. Testing of Gearbox 2 (GB2) using the two-speed turbine controller that has been used in prior testing. This test series will investigate non-torque loads, high-speed shaft misalignment, and reproduction of field conditions in the dynamometer. This test series will also include vibration testing using an eddy-current brake on the gearbox's high speed shaft.

  9. Long-term operating experience for the ATLAS superconducting resonators

    SciTech Connect (OSTI)

    Pardo, R.; Zinkann, G.

    1999-12-21T23:59:59.000Z

    Portions of the ATLAS accelerator have been operating now for over 21 years. The facility has accumulated several million resonator-hours of operation at this point and has demonstrated the long-term reliability of RF superconductivity. The overall operating performance of the ATLAS facility has established a level of beam quality, flexibility, and reliability not previously achieved with heavy-ion accelerator facilities. The actual operating experience and maintenance history of ATLAS are presented for ATLAS resonators and associated electronics systems. Solutions to problems that appeared in early operation as well as current problems needing further development are discussed.

  10. Reliable High Performance Peta- and Exa-Scale Computing

    SciTech Connect (OSTI)

    Bronevetsky, G

    2012-04-02T23:59:59.000Z

    As supercomputers become larger and more powerful, they are growing increasingly complex. This is reflected both in the exponentially increasing numbers of components in HPC systems (LLNL is currently installing the 1.6 million core Sequoia system) as well as the wide variety of software and hardware components that a typical system includes. At this scale it becomes infeasible to make each component sufficiently reliable to prevent regular faults somewhere in the system or to account for all possible cross-component interactions. The resulting faults and instability cause HPC applications to crash, perform sub-optimally or even produce erroneous results. As supercomputers continue to approach Exascale performance and full system reliability becomes prohibitively expensive, we will require novel techniques to bridge the gap between the lower reliability provided by hardware systems and users unchanging need for consistent performance and reliable results. Previous research on HPC system reliability has developed various techniques for tolerating and detecting various types of faults. However, these techniques have seen very limited real applicability because of our poor understanding of how real systems are affected by complex faults such as soft fault-induced bit flips or performance degradations. Prior work on such techniques has had very limited practical utility because it has generally focused on analyzing the behavior of entire software/hardware systems both during normal operation and in the face of faults. Because such behaviors are extremely complex, such studies have only produced coarse behavioral models of limited sets of software/hardware system stacks. Since this provides little insight into the many different system stacks and applications used in practice, this work has had little real-world impact. My project addresses this problem by developing a modular methodology to analyze the behavior of applications and systems during both normal and faulty operation. By synthesizing models of individual components into a whole-system behavior models my work is making it possible to automatically understand the behavior of arbitrary real-world systems to enable them to tolerate a wide range of system faults. My project is following a multi-pronged research strategy. Section II discusses my work on modeling the behavior of existing applications and systems. Section II.A discusses resilience in the face of soft faults and Section II.B looks at techniques to tolerate performance faults. Finally Section III presents an alternative approach that studies how a system should be designed from the ground up to make resilience natural and easy.

  11. Adaptive Reliability Analysis of Excavation Problems

    E-Print Network [OSTI]

    Park, Jun Kyung

    2012-10-19T23:59:59.000Z

    . This analysis couples the adaptive design capabilities of the observational method with updated reliability indices, to be used in risk-based design decisions. A probabilistic framework is developed to predict three-dimensional deformation profiles due...

  12. Demand Response For Power System Reliability: FAQ

    SciTech Connect (OSTI)

    Kirby, Brendan J [ORNL

    2006-12-01T23:59:59.000Z

    Demand response is the most underutilized power system reliability resource in North America. Technological advances now make it possible to tap this resource to both reduce costs and improve. Misconceptions concerning response capabilities tend to force loads to provide responses that they are less able to provide and often prohibit them from providing the most valuable reliability services. Fortunately this is beginning to change with some ISOs making more extensive use of load response. This report is structured as a series of short questions and answers that address load response capabilities and power system reliability needs. Its objective is to further the use of responsive load as a bulk power system reliability resource in providing the fastest and most valuable ancillary services.

  13. Reliability-Based Optimization Using Evolutionary Algorithms

    E-Print Network [OSTI]

    Deb, Kalyanmoy

    Uncertainties in design variables and problem parameters are often inevitable and must be considered in an optimization task if reliable optimal solutions are sought. Besides a number of sampling techniques, there exist ...

  14. Reliability Challenges for Solar Energy (Presentation)

    SciTech Connect (OSTI)

    Kurtz, S.

    2009-04-27T23:59:59.000Z

    PV industry can benefit from reliability testing experience of microelectronics industry . Si modules perform well in field; CdTe/CIGS must be sealed to moisture; CPV in product development stage.

  15. PV Module Reliability Research (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-06-01T23:59:59.000Z

    This National Center for Photovoltaics sheet describes the capabilities of its PV module reliability research. The scope and core competencies and capabilities are discussed and recent publications are listed.

  16. Photovoltaic Reliability and Engineering (Revised) (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-06-01T23:59:59.000Z

    Capabilities fact sheet for the National Center for Photovoltaics: Photovoltaic Reliability and Engineering. One-sided sheet that includes Scope, Core Competencies and Capabilities, and Contact/Web information.

  17. Sandia National Laboratories: Physics of Reliability: Evaluating...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physics of Reliability: Evaluating Design Insights for Component Technologies in Solar program Sandia R&D Funded under New DOE SunShot Program On November 27, 2013, in Energy,...

  18. Reliability Issues for Photovoltaic Modules (Presentation)

    SciTech Connect (OSTI)

    Kurtz, S.

    2009-10-01T23:59:59.000Z

    Si modules good in field; new designs need reliability testing. CdTe & CIGS modules sensitive to moisture; carefully seal. CPV in product development stage; benefits from expertise in other industries.

  19. Sandia National Laboratories: increase power system reliability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    reliability Sandia, DOE Energy Storage Program, GeneSiC Semiconductor, U.S. Army ARDEC: Ultra-High-Voltage Silicon Carbide Thyristors On March 29, 2013, in Capabilities,...

  20. RELIABILITY IMPROVEMENT OF BART TRAIN CONTROL

    E-Print Network [OSTI]

    Turner, D.B.

    2011-01-01T23:59:59.000Z

    equipment to resolve equipment reliability problems must bereliability problems was seen to be a mandatory first step in improving equipmentreliability of the Bay Area Rapid Tran- sit district's vehicle-borne Automatic Train Control equipment.