Powered by Deep Web Technologies
Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Thermoelectric Materials By Design: Mechanical Reliability (Agreement...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Materials By Design: Mechanical Reliability (Agreement 14957) Thermoelectric Materials By Design: Mechanical Reliability (Agreement 14957) Presentation from the U.S. DOE Office of...

2

Definition: Reliability Coordinator Information System | Open Energy  

Open Energy Info (EERE)

Reliability Coordinator Information System Reliability Coordinator Information System Jump to: navigation, search Dictionary.png Reliability Coordinator Information System The system that Reliability Coordinators use to post messages and share operating information in real time.[1] Related Terms Reliability Coordinator References ↑ Glossary of Terms Used in Reliability Standards An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Reliability_Coordinator_Information_System&oldid=480407" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

3

Definition: Reliability Coordinator Area | Open Energy Information  

Open Energy Info (EERE)

Coordinator Area Coordinator Area Jump to: navigation, search Dictionary.png Reliability Coordinator Area The collection of generation, transmission, and loads within the boundaries of the Reliability Coordinator. Its boundary coincides with one or more Balancing Authority Areas.[1] Related Terms transmission lines, Reliability Coordinator, Balancing Authority Area, transmission line, balancing authority, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inlin LikeLike UnlikeLike You like this.Sign Up to see what your friends like. e Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Reliability_Coordinator_Area&oldid=502626" Categories: Definitions ISGAN Definitions What links here Related changes Special pages

4

Definition: Reliability Coordinator | Open Energy Information  

Open Energy Info (EERE)

Coordinator Coordinator Jump to: navigation, search Dictionary.png Reliability Coordinator The entity that is the highest level of authority who is responsible for the reliable operation of the Bulk Electric System, has the Wide Area view of the Bulk Electric System, and has the operating tools, processes and procedures, including the authority to prevent or mitigate emergency operating situations in both nextday analysis and real-time operations. The Reliability Coordinator has the purview that is broad enough to enable the calculation of Interconnection Reliability Operating Limits, which may be based on the operating parameters of transmission systems beyond any Transmission Operator's vision.[1] Related Terms transmission lines, Bulk Electric System, transmission line

5

Columbia River System Operation Review : Final Environmental Impact Statement, Appendix R: Pacific Northwest Coordination agreement (PNCA).  

SciTech Connect (OSTI)

Currently, the Federal government coordinates the planning and operation of the Federal Columbia River Power System (FCRPS) with projects owned and operated by the region`s non-Federal hydrogenerating utilities pursuant to the Pacific North-west Coordination Agreement (PNCA). The Bureau of Reclamation (Reclamation), the Corps of Engineers (Corps), and the Bonneville Power Administration (BPA) are parties to the PNCA on behalf of the government of the United States. The PNCA is a complex agreement that provides an opportunity for the region`s power producers to maximize the power system`s reliability and economy while meeting their multiple-use objectives. The PNCA does not dictate the operation of the resources it coordinates. It is essentially an accounting mechanism that exchanges the power produced among the parties in order to improve the reliability of the system and reduce regional power costs. Project owners retain complete autonomy to operate as needed to meet their multiple-use requirements. The PNCA was executed in 1964 as an important component of regional plans to maximize the Northwest`s hydro resource capability. Maximization also included the development of storage projects on the Columbia River in Canada pursuant to the terms of the 1964 Columbia River Treaty. Because of the link between power coordination and Treaty issues, the current parties to the PNCA, currently are contemplating entering into a replacement or renewed power coordination agreement. Because the power coordination agreement is a consensual arrangement, its ultimate provisions must be acceptable to all of its signatories. This Appendix R to the Final Environmental Impact Statement of the Columbia River System is a presentation of the Pacific North-west Coordination Agreement.

Columbia River System Operation Review (U.S.)

1995-11-01T23:59:59.000Z

6

Interrater Agreement and Reliability of Observed Behaviors: Comparing Percentage Agreement, Kappa, Correlation Coefficient, ICC and G Theory  

E-Print Network [OSTI]

INTERRATER AGREEMENT AND RELIABILITY OF OBSERVED BEHAVIORS: COMPARING PERCENTAGE AGREEMENT, KAPPA, CORRELATION COEFFICIENT, ICC AND G THEORY A Thesis by QIAN CAO Submitted to the Office of Graduate Studies of Texas A&M University... 2013 Major Subject: Educational Psychology Copyright 2013 Qian Cao ii ABSTRACT The study of interrater agreement and itnerrater reliability attract extensive attention, due to the fact that the judgments from multiple raters...

Cao, Qian

2013-04-28T23:59:59.000Z

7

Requirements to coordinate agreements, milestones and decision documents (AMDD)  

Broader source: Energy.gov [DOE]

Environmental agreements, milestones and decision documents (AMDD) which meet certain thresholds are reviewed and approved by Headquarters (HQ) before entering into negotiations and commitments.

8

Relay coordination and protection failure effects on reliability indices in an interconnected sub-transmission system  

Science Journals Connector (OSTI)

Protection system failure is the main cause of cascading outages. It has been shown that the hidden failures lead to cascading outages. However, the effects of the coordination method as well as the hidden failure of the protection systems have not been investigated yet. In this paper, an algorithm based on sequential Monte Carlo simulation is proposed to find the reliability indices for different overcurrent relay coordination methods. The proposed algorithm is applied to the results of different relay coordination methods of a real network. The indices SAIFI, CAIDI, CAIFI and ENS for the results of different relay coordination methods are obtained strictly based on the contribution of the protection failure issues. Then, a comparison is made between the results of the different relay coordination methods in order to show how the coordination methods affect the reliability indices.

Kazem Mazlumi; Hossein Askarian Abyaneh

2009-01-01T23:59:59.000Z

9

AGREEMENT  

Office of Legacy Management (LM)

terms of this agreement, to reimburse the Principal for the furnishing of such equipment, services, and labor; and, WHEREAS, the parties have agreed that the State and DOE will...

10

Reliability enhancement of a radial distribution system using coordinated aggregation based particle swarm optimization considering customer and energy based indices  

Science Journals Connector (OSTI)

This paper describes an algorithm for optimum modifications for failure rate and repair time for a radial electrical distribution system. The modifications are with respect to a penalty cost function minimization. The cost function has been minimized subject to the energy based and customer oriented indices, i.e. AENS, SAIFI, SAIDI and CAIDI. Coordinated aggregation based particle swarm optimization (CAPSO) has been used for optimization. The algorithm has been implemented on a sample radial distribution system. The results obtained have been compared with those obtained using PSO.

Rajesh Arya; S.C. Choube; L.D. Arya; D.P. Kothari

2012-01-01T23:59:59.000Z

11

Case Study - Western Electricity Coordinating Council  

Broader source: Energy.gov (indexed) [DOE]

A Smart Grid Strategy for Assuring Reliability of the Western Grid The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and...

12

INTERNATIONAL AGREEMENTS  

Broader source: Energy.gov (indexed) [DOE]

INTERNATIONAL INTERNATIONAL AGREEMENTS Signed by Secretary Spencer Abraham January 2001-December 2004 TABLE OF CONTENTS Joint Statement of ntent between the Department of Energy of the United States ofAmerica and The Ministry of Energy and Mines of the Republic ofPeru on Cooperation in the Field of Energy -Tab 1 Fifth Hemispheric Energy Ministers Meeting Mexico City, Mexico - March 9, 2001. Mexico Declaration - Energy: A Crucial Factor for Integration and Sustainable Development in the Hemisphere - Tab 2 Extension of the Agreement for Energy Cooperation between the Department of Energy of the United States ofAmerica and the Secretariat ofEnergy of the United Mexican States, and its Four Annexes - Tab3 Implementing Agreement between the Department ofEnergy of the United States ofAmerica and the

13

Compliance Agreements | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Compliance » Compliance Compliance » Compliance Agreements Compliance Agreements This photo shows the Savannah River Site’s Heavy Water Components Test Reactor during decommissioning. This photo shows the Savannah River Site's Heavy Water Components Test Reactor during decommissioning. Compliance agreements illustrate and help support the development of effective compliance approaches and strategies, and can assist in promoting greater cooperation, coordination, and consistency with other EM offices, Departmental organizations, and State agencies. Please click the site or location name to view a listing of the associated agreements and summaries. Idaho Oak Ridge Paducah Portsmouth Richland/Office of River Protection Savannah River Closure Sites NNSA Sites West Valley Demonstration Project

14

PROGRAMMATIC AGREEMENT  

Broader source: Energy.gov (indexed) [DOE]

PROTOTYPE PROTOTYPE PROGRAMMATIC AGREEMENT BETWEEN THE UNITED STATES DEPARTMENT OF ENERGY, THE [INSERT STATE NAME] ENERGY OFFICE AND THE [INSERT STATE NAME] STATE HISTORIC PRESERVATION OFFICE REGARDING EECBG, SEP AND WAP UNDERTAKINGS February 5, 2010 WHEREAS, the United States Department of Energy (DOE) administers the following financial assistance programs: the Energy Efficiency and Conservation Block Grant Program under the Energy Independence and Securities Act of 2007 (EECBG); the State Energy Plan under the Energy Policy and Conservation Act of 1975 and the State Energy Efficiency Programs Improvement Act of 1990 (SEP); and the Weatherization Assistance Program (WAP) for Low- Income Persons under Title IV of the Energy Conservation and Production Act, the Energy

15

Coordination of Energy Efficiency and Demand Response  

E-Print Network [OSTI]

to ensure reliability. Capacity market programs: Customerswholesale, forward capacity markets offer new opportunitiesinto the forward-capacity market. Coordination of Energy

Goldman, Charles

2010-01-01T23:59:59.000Z

16

Faculty -ITALIAN NAME Faculty -ENGLISH NAME Bilateral Agreement Nr Erasmus Code Name of Institution area code Description of area Dept. Co-ordinator AGRARIA Agriculture Sciences 33 A -INNSBRU01 Leopold-Franzens Universitt Innsbruck 7.2 Environmental Scien  

E-Print Network [OSTI]

of Institution area code Description of area Dept. Co-ordinator AGRARIA Agriculture Sciences 33 A -INNSBRU01 Leopold-Franzens Universität Innsbruck 7.2 Environmental Sciences, Ecology SCOTTON Michele AGRARIA Agriculture Sciences 882 A -SALZBUR08 Fachhoschschule Salzburg 1.9 Others MONTECCHIO Lucio AGRARIA Agriculture

Schenato, Luca

17

Transactive Control and Coordination  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transactive Control and Coordination Transactive Control and Coordination Speaker(s): Robert Pratt Date: March 15, 2013 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Mary Ann Piette Transactive control and coordination is PNNL's approach to operationalizing smart grid distributed assets. It is a specific case of the general class of techniques the GridWise Architecture Council refers to as transactive energy - "techniques for managing the generation, consumption or flow of electric power within an electric power system through the use of economic- or market-based constructs, with full consideration of grid reliability constraints. The term "transactive" comes from considering that decisions are made based on a value. These decisions may be analogous to or literally economic

18

Platte River Cooperative Agreement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Platte River Cooperative Agreement Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Platte River Cooperative Agreement PEIS, NE, WY,...

19

Sandia National Laboratories: Agreements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Agreement Types Biofuels research photo Cooperative Research and Development Agreement (CRADA) Sandia and one or more partners outside the federal government collaborate...

20

Contract and Agreement Templates  

Broader source: Energy.gov [DOE]

Templates for a request for proposals (RFP), loan loss reserve(LLR) fund agreement, and energy efficiency loan program agreements to design a residential financing program.

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Power Purchase Agreements  

Broader source: Energy.gov [DOE]

Presentation covers the power purchase agreements taken from the FEMP Alternative Finance Options (AFO) webinar.

22

Loan Loss Reserve Agreement  

Broader source: Energy.gov [DOE]

Loan Loss Reserve Agreement, from the Tool Kit Framework: Small Town University Energy Program (STEP).

23

Electricity Reliability  

E-Print Network [OSTI]

Electricity Delivery and Energy Reliability High Temperature Superconductivity (HTS) Visualization in the future because they have virtually no resistance to electric current, offering the possibility of new electric power equipment with more energy efficiency and higher capacity than today's systems

24

Medicare Coordination  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Medicare Coordination Medicare Coordination Medicare Coordination Medicare eligibility is determined by the Social Security Administration, not LANS. Contact Retiree Insurance Providers Medicare enrollment and eligibility requirements Eligibility Typically, you are eligible for Medicare: At age 65, or Before age 65, after receiving Social Security disability benefits for at least 24 months Enrollment You should receive Medicare enrollment information from the Social Security Administration (SSA) about four months prior to your 65th birthday. Contact Medicare.gov, review the national Medicare handbook, or call your local SSA office for more information. Enroll you and any eligible family members in Medicare Part B as soon as you become eligible for Medicare Part A. Failure could result in

25

Coordinated Aggregation  

Broader source: Energy.gov (indexed) [DOE]

Coordinated Coordinated Aggregation of Distributed Energy Resources Alejandro Dominguez-Garcia Univ of Illinois Pravin Varaiya & Kameshwar Poolla UC Berkeley August 6, 2013 Dominguez-Garcia, Poolla, Varaiya CERTS Review 2013 August 6, 2013 0 / 45 Our Research Group Students Anand Subramanian, Justin Hughes Jared Porter, Zach Lerner Post-docs Ashutosh Nayyar He Hao, Borhan Sanandaji Faculty Alejandro Dominguez-Garcia Kameshwar Poolla, Pravin Varaiya Dominguez-Garcia, Poolla, Varaiya CERTS Review 2013 August 6, 2013 0 / 45 CERTS Research Activities Network case of Risk-Limiting Dispatch Improved Load Forecasting with fine-grain measurements Coordinated Aggregation of Distributed Resources Dominguez-Garcia, Poolla, Varaiya CERTS Review 2013 August 6, 2013 1 / 45 Risk Limiting Dispatch Dominguez-Garcia, Poolla, Varaiya CERTS Review 2013 August

26

The Agreement on Safeguards  

Science Journals Connector (OSTI)

The term safeguard or safeguard measure refers to trade measures that are ... of the GATT and the WTO Agreement on Safeguards (hereinafter referred to as the Safeguards Agreement or SA) authorizes Members...

Yong-Shik Lee Ph.D.

2005-01-01T23:59:59.000Z

27

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report  

Broader source: Energy.gov (indexed) [DOE]

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report The following information represents a partial sequence of events based upon Reliability Coordinator information available to NERC. It is not clear if these events caused the event or were a consequence of other events. NERC is establishing teams to study the event and will coordinate with FERC, DOE, the industry and others. NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report More Documents & Publications North American Electric Reliability Council Power Outage Update North American Electric Reliability Council Outage Announcement U.S. - Canada Power System Outage Task Force: Final Report on the

28

The transporter's impact on channel coordination and contractual agreements  

E-Print Network [OSTI]

. . . . . . . . . . . . . . . . . . . . . . . 30 III.1. Problem Setting . . . . . . . . . . . . . . . . . . . . . . . 31 III.2. The Integrated Inventory/Quantity-Based Dispatch Model 33 III.3. Analytical Comparison of Time- and Quantity-Based Policies...I if q2I dispatch cost after the bumping clause. Figure 2 DC(q) as Interpreted after the Bumping Clause 0 50 100 150 200 10 20 30 40 50 q An exact analysis of the model...

Mutlu, Fatih

2006-10-30T23:59:59.000Z

29

Thermoelectric Materials By Design: Mechanical Reliability (Agreement 14957)  

Broader source: Energy.gov [DOE]

Presentation from the U.S. DOE Office of Vehicle Technologies "Mega" Merit Review 2008 on February 25, 2008 in Bethesda, Maryland.

30

The User Agreement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

User Agreement User Agreement Oak Ridge National Laboratory is home to a number of highly sophisticated experimental user facilities. These research facilities, instruments, and laboratories are designed to serve Laboratory researchers, engineers, and technical staff, as well as external researchers from universities, industries, foreign institutions and other government laboratories. Sharing these state-of-the-art facilities with the scientific, industrial, and technical communities provides access to unique and specialized technology, equipment and instrumentation without burdening the user with the astronomical capital costs of building such facilities. Characteristics of User Agreements * User Agreements come in two types; proprietary and non-proprietary. The characteristics of

31

MATERIALS TRANSFER AGREEMENT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MTAXX-XXX 1 MATERIAL TRANSFER AGREEMENT for Manufacturing Demonstration Facility and Carbon Fiber Technology Facility In order for the RECIPIENT to obtain materials, the RECIPIENT...

32

Binding Facility Agreement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

at the Portsmouth Gaseous Diffusion Plant (PORTS) under the Gaseous Diffusion Plant (GDP) Lease Pursuant to the Lease Agreement Between the United States Department of Energy...

33

Binding Facility Agreement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

at the Portsmouth Gaseous Diffusion Plant (PORTS) under the Gaseous Diffusion Plant (GDP) Lease Pursuant to the Lease Agreement Between the United States Department oEnergy...

34

Power Purchase Agreements  

Broader source: Energy.gov [DOE]

A Power Purchase Agreement (PPA) is a financing structure that enables property owners or tenants, including state and local governments, to realize the benefits of renewable energy generation...

35

Power Purchase Agreement Webinars  

Broader source: Energy.gov [DOE]

Provides a listing of past power purchase agreement webinars and associated files. Author: U. S. Department of Energy, Energy Efficiency & Renewable Energy

36

Solar Power Purchase Agreements  

Broader source: Energy.gov [DOE]

Provides an overview of solar power purchase agreements including how they work, benefits and challenges and eligibility. Author: United States Environmental Protection Agency (EPA)

37

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report  

Broader source: Energy.gov (indexed) [DOE]

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report The following information represents a partial sequence of events based upon Reliability Coordinator information available to NERC. It is not clear if these events caused the event or were a consequence of other events. NERC is establishing teams to study the event and will coordinate with FERC, DOE, the industry and others. NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report More Documents & Publications North American Electric Reliability Council Power Outage Update Blackout 2003: Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations

38

International Agreements Comments  

Broader source: Energy.gov (indexed) [DOE]

ITRATIOAL ITRATIOAL AGREE MENT~S/ MITMES SEREARY SAME W. BDAN JANUARY 205-EEME 2008o Page 1 of 1 Matthews, Carol From: Morman, Laurie Sent: Monday, November 24, 2008 2:52 PM To: Nicoll, Eric; Matthews, Carol Subject: RE: MOU's and Agreements Attachments: Agreements - 1979 to Present.pdf Here's on electronic version of what PI provided............. From: Nicoll, Eric Sent: Monday, November 24, 2008 11:40 AM To: Morman, Laurie; Kolb, Ingrid; Matthews, Carol Subject: RE: MOU's and Agreements OK then we will not include the ones which have come up here. Thanks. Did they organize it by year? From: Morman, Laurie Sent: Monday, November 24, 2008 11:38 AM To: Nicoll, Eric; Kolb, Ingrid; Matthews, Carol Subject: RE: MOU's and Agreements PI has already provided the International agreements.

39

Unilateral (In) Nondisclosure Agreement ? Sample  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AGREEMENT ("Agreement") This Agreement is entered into by and between the Alliance for Sustainable Energy, LLC ("Alliance"), the Manager and Operator of the National...

40

North American Electric Reliability Corporation (NERC): Reliability  

Broader source: Energy.gov (indexed) [DOE]

Corporation (NERC): Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid North American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid North American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid. NERC develops and enforces Reliability Standards; assesses adequacy annually via a ten-year forcast and winter and summer forecasts; monitors the bulk power systems; and educates, trains, and certifies industry personnel. North American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid More Documents & Publications Re: DOE Request for Information - Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Power Purchase Agreements  

Broader source: Energy.gov (indexed) [DOE]

Power Purchase Agreements Power Purchase Agreements Chandra Shah, NREL 303-384-7557 chandra.shah@nrel.gov February 2011 revised 2 | Federal Energy Management Program eere.energy.gov Overview * Customer-sited power purchase agreement (PPA) definition * Project process * Project examples * Utility Renewable Energy Services Contract (URESC) * Enhanced use lease (EUL) * PPA support, resources and key points 3 | Federal Energy Management Program eere.energy.gov * Private entity purchases, installs, owns, operates and maintains customer-sited renewable equipment * Site purchases electricity through power purchase agreement (PPA) * Pros - Renewable developer (or partner) eligible for tax incentives, accelerated depreciation - No agency up-front capital required - Renewable developer provides O&M - Minimal risk to government

42

ZERH Lender Partnership Agreement  

Broader source: Energy.gov [DOE]

What is expected of partners? Every type of partner has its own role. Review the partnership agreement package below for more information on partner expectations.Lender partners may be any person...

43

ZERH Verifier Partnership Agreement  

Broader source: Energy.gov [DOE]

What is expected of partners? Every type of partner has its own role. Review the partnership agreement package below for more information on partner expectations.Verifier partners must be...

44

ZERH Builder Partnership Agreement  

Broader source: Energy.gov [DOE]

What is expected of partners? Every type of partner has its own role. Review the partnership agreement package below for more information on partner expectations.Builder partners may be any person...

45

ZERH Trainer Partnership Agreement  

Broader source: Energy.gov [DOE]

What is expected of partners? Every type of partner has its own role. Review the partnership agreement package below for more information on partner expectations.Training partners may be any...

46

Pinellas Remediation Agreement Summary  

Broader source: Energy.gov (indexed) [DOE]

Pinellas Pinellas Agreement Name Remediation Agreement for the Four and One-Half Acre Site in Largo, Pinellas County, Florida State Florida Agreement Type Remediation Agreement Legal Driver(s) CERCLA/ Atomic Energy Act of 1954, as amended/ Florida Air and Water Pollution Control Act Scope Summary Remediation of property adjacent to the former Pinellas Plant Parties DOE; Florida Department of Environmental Protection Date 3/12/2001 SCOPE * Remediate the groundwater under a parcel of property adjacent to DOE's former Pinellas Plant to levels consistent with industrial use. * Complete remedial actions at the site in accordance with a Remedial Action Plan prepared by DOE and approved by FDEP. * Submit quarterly reports of interim remedial actions at the Site.

47

NREL: Gearbox Reliability Collaborative - Gearbox Reliability Collaborative  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Publications Publications Screenshot of the cover of an NREL report, titled Gearbox Reliability Collaborative Project Report: Findings from Phase 1 and Phase 2 testing. The NREL wind research program's Gearbox Reliability Collaborative publishes reports and presentations of its activities. General Gearbox Reliability Collaborative Phase 3 Gearbox 2 Test Plan 2013 DOE/NREL Gearbox Reliability Collaborative: All Members Meeting Agenda 2012 Gearbox Reliability Collaborative Phase 1 and 2: Testing and Modeling Results 2012 Gearbox Reliability Collaborative Update: A Brief (Presentation) Jan 2012 Gearbox Reliability Collaborative Update (Presentation) April 2012 NREL Collaborates to Improve Wind Turbine Technology (Fact Sheet) 2012 Gearbox Reliability Collaborative - Phase 1 and 2 Overview

48

Power Purchase Agreements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Text Text eere.energy.gov Power Purchase Agreements Chandra Shah, NREL 303-384-7557 chandra.shah@nrel.gov February 2011 revised 2 | Federal Energy Management Program eere.energy.gov Overview * Customer-sited power purchase agreement (PPA) definition * Project process * Project examples * Utility Renewable Energy Services Contract (URESC) * Enhanced use lease (EUL) * PPA support, resources and key points 3 | Federal Energy Management Program eere.energy.gov * Private entity purchases, installs, owns, operates and maintains customer-sited renewable equipment * Site purchases electricity through power purchase agreement (PPA) * Pros - Renewable developer (or partner) eligible for tax incentives, accelerated depreciation - No agency up-front capital required - Renewable developer provides O&M

49

CROSS-SERVICING AGREEMENT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CROSS-SERVICING AGREEMENT CROSS-SERVICING AGREEMENT PLWOSE: This agreement establishes the terms under which GSA Flcct Management will p m e m and pay for the specified goods and/or services from another government agcncy: (Check Block(s) Which ~ p p l y ) , [ X 1 Category I - Scheduled Repairs- Per Job Labor Schedule ( f a t rate charge) [ X ] Category I I - Unschcduled Repairs- Rate Per Hour Name and Address of Supplying Activity: BWXT Pantcx, LLC. P. 0. BOX 30020 Amarillo. Texas 79 120-0020 - Effective Date: [ X ] Category I l l - Servicing & Dispensing of Petroleum Products ~.d-'@- Terminate Date (Effective until canccled by either agcncy) 30-DAY WRIITEN NOTICE [ 1 PAC o r [ X ] Non-IPAC (Attachm'mt A) BILLING INSTRUCTIONS: .- . Monthly billings submitted by Standard Form 1080 or another approveh form will be supported by appropriate

50

FFTF Authorization Agreement  

SciTech Connect (OSTI)

The purpose of the Authorization Agreement is to serve as a mechanism whereby the U.S. Department of Energy, Richland Operations Office (RL) and Fluor Hanford (FH) jointly clarify and agree to key conditions for conducting work safely and efficiently in the Fast Flux Test Facility (FFTF). Work must be accomplished in a manner that achieves high levels of quality while protecting the environment and the safety and health of workers and the public, and complying with applicable contractual and regulatory requirements. It is the intent of this Agreement to address those items of significant importance in establishing and supporting the FFTF Authorization Envelope, but this Agreement in no way alters the terms and conditions of the Project Hanford Management Contract (PHMC), Contract Number DE-AC06-96RL13200.

DAUTEL, W.A.

2000-09-25T23:59:59.000Z

51

STANDARD USER AGREEMENT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

REV 6/3/2010 REV 6/3/2010 Proprietary User Agreement No. PR-14- BETWEEN UT-BATTELLE, LLC. ("CONTRACTOR") Operator of Oak Ridge National Laboratory (hereinafter "Laboratory") under U.S. Department of Energy (DOE) Contract No. DE-AC05-00OR22725 and NAME OF USER INSTITUTION ("USER") (Collectively, "the Parties") The obligations of the Contractor may be transferred and shall apply to any successor in interest to said Contractor continuing the operation of the DOE facilities involved in this Proprietary User Agreement. ARTICLE I. FACILITIES AND SCOPE OF WORK CONTRACTOR will make available to employees, consultants and representatives of USER

52

Research License Agreement Template  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research License Template Research License Template RESEARCH LICENSE Between Alliance for Sustainable Energy, LLC And [COMPANY or UNIVERSITY NAME] This License Agreement (hereinafter "Agreement"), which shall be effective on the date it is executed by the last Party to sign (the "Effective Date"), is between Alliance for Sustainable Energy, LLC (hereinafter "Alliance"), Management and Operating Contractor for the National Renewable Energy Laboratory (hereinafter "NREL") located at 1617 Cole Blvd., Golden, Colorado 80401 and [COMPANY or UNIVERSITY NAME], (hereinafter "Research Licensee"), a [FOR-PROFIT or NON-PROFIT] entity organized and existing under the laws of the State of [NAME of STATE] and having a principal place of business at [ADDRESS], hereinafter referred

53

Personal Services Agreements Waivers  

E-Print Network [OSTI]

not have the staff or resources necessary to perform this specialized service. 5. Trash and RecyclingPersonal Services Agreements Waivers: Appendix A2 Responsible Administrative Units: Human Resources Services: Services include trash removal from campus and recycling for the campus community. The School

54

Programmatic Agreement for Colorado  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE), Energy Efficiency and Conservation Block Grant Program (EECBG), Weatherization Assistance Program (WAP), State Energy Plan (SEP), Colorado State Historic Preservation Office (SHPO), Colorado Governors Energy Office (GEO), historic preservation, Section 106 of the National Historic Preservation Act, National Register of Historic Places, National Historic Preservation Act (NHPA), Programmatic Agreement for Colorado.

55

Case Study - Western Electricity Coordinating Council  

Broader source: Energy.gov (indexed) [DOE]

A Smart Grid Strategy for Assuring Reliability of the Western Grid A Smart Grid Strategy for Assuring Reliability of the Western Grid The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting bulk electric system reliability in the Western Interconnection. WECC and its members manage the operation and planning of the vast interconnected transmission system connecting generators and loads across almost 1.8 million square miles of territory. The Western Interconnection Synchrophasor Program (WISP), led by WECC and involving 18 partners, is an initiative to modernize operation of the transmission system in the Western Interconnection, increasing reliability and system performance, and enabling greater use of renewable resources such as solar, hydro, and wind.

56

Focus Sensitive Coordination  

E-Print Network [OSTI]

This thesis investigates the role of the Focus Sensitive Operators (FSOs) even and also when found inside of a coordination. Coordinations of this form are called Focus Sensitive Coordinations (FSC) and include or even, ...

Hulsey, Sarah McNearney

2008-01-01T23:59:59.000Z

57

Power Purchase Agreements Update  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FEDERAL ENERGY MANAGEMENT PROGRAM FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov Federal Utility Partnership Working Group Meeting April 20-21 in Portland, Oregon Power Purchase Agreement Update April 21, 2011 Chandra Shah chandra.shah@nrel.gov 2 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov Overview * Power Purchase Agreement (PPA) Template * PPA Request For Information (RFI) 3 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov PPA Template * DLA Energy has an updated PPA template - Includes Best Value evaluation (rather than Low Price/Technically Acceptable) - Additional updates will be made based on the PPA RFI - Updated template will be posted on FEMP PPA Sample Document web site http://www1.eere.energy.gov/femp/financing/ppa_sampledocs.html 4 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov

58

Alcator Collaboration Policy Agreement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2.4 June 15, 2011 2.4 June 15, 2011 Alcator Collaboration Policy Agreement Preamble The Alcator group welcomes collaborations with outside groups; they significantly enhance our program and increase our impact in the national and international arena. These collaborations benefit both parties and the fusion program as a whole. It is intended that each collaborating group have a clear programmatic role appropriate to the scale of its effort and appropriate representation in Alcator executive committees. Programs will be mutually agreed between each collaborating party and the Alcator leadership. An outline of the program will normally be attached to this policy agreement except where the collaboration is of a brief or occasional nature. We offer our collaborators full access to C-Mod data as it is collected and analyzed and,

59

Power Purchase Agreements Update  

Broader source: Energy.gov (indexed) [DOE]

April 20-21 in Portland, Oregon April 20-21 in Portland, Oregon Power Purchase Agreement Update April 21, 2011 Chandra Shah chandra.shah@nrel.gov 2 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov Overview * Power Purchase Agreement (PPA) Template * PPA Request For Information (RFI) 3 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov PPA Template * DLA Energy has an updated PPA template - Includes Best Value evaluation (rather than Low Price/Technically Acceptable) - Additional updates will be made based on the PPA RFI - Updated template will be posted on FEMP PPA Sample Document web site http://www1.eere.energy.gov/femp/financing/ppa_sampledocs.html 4 | FEDERAL ENERGY MANAGEMENT PROGRAM femp.energy.gov PPA Request for Information * Background - PPA issues identified based on meetings/telecons

60

Solar Power Purchase Agreements  

Broader source: Energy.gov (indexed) [DOE]

Solar Power Purchase Agreements Solar Power Purchase Agreements Brian Millberg | Energy Manager, City of Minneapolis Direct Ownership * Financial: Even at $3/kW installed cost, simple payback is 18 years (initial electricity cost of $0.10/kWh and 3%/year electricity cost inflation) * Politics: How to justify expense with such a long payback * If RECS begin to have some real value, this would be a positive for ownership. 2 PPA Advantages * No/low up-front costs * City can take advantage of Investment Tax Credits (ITCs) - This leads to low electricity costs * Predictable electricity cost for length of contract * Avoid direct design/rebate/permitting work * No maintenance/operation headaches 3 PPA Financial Case (1 MW system) * PPA allows a developer to reduce system cost through:

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Engineering Service Level Agreement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Memorandum of Understanding for the Memorandum of Understanding for the Deployment of CASTLE-PX 1.0 Between: Lawrence Livermore National Laboratory and B&W Pantex December 4, 2009 CODT-2009-4390 DSW-10-53558-115-DSW CASTLE-PX MOU CODT-2009-4390 DSW-10-53558-115-DSW ii Table of Contents 1 PURPOSE AND OBJECTIVE ............................................................................................................ 1 1.1 PARTIES TO THE AGREEMENT ......................................................................................................... 1 1.2 COMMENCEMENT DATE .................................................................................................................. 1 1.3 DURATION ....................................................................................................................................... 1

62

Cooperative Research & Development Agreements | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

CRADA SHARE Cooperative Research and Development Agreement A Cooperative Research and Development Agreement (CRADA) allows non-federal entities (industry, universities,...

63

Career Map: Instrumentation Coordinator  

Broader source: Energy.gov [DOE]

The Wind Program's Career Map provides job description information for Instrumentation Coordinator positions.

64

MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT  

Office of Legacy Management (LM)

November/December 2004 November/December 2004 Report Period: November 1- December 31, 2004 DOE Project Coordinator: Art Kleinrath HIGHLIGHTS The Program Directive for the wildlife survey is on schedule for completion by January 15. Comments from the Biological Technical Assistance group have been incorporated. MRAP A punchlist of mill site restoration items was prepared. DOE and the City of Monticello have agreed upon which entity will perform each item on the punchlist. MVP No significant activities to report. FF A Monthly Report November- December 2004 Page 2 of5 STATUS MONTICELLO PROJECTS FEDERAL FACILITIES AGREEMENT REPORT November/December 2004 Report Period: November 1- December 31, 2004 DOE Project Coordinator: Art Kleinrath Operable Units I and II DOE and the City of Monticello (City) are exploring the possibility of transferring the former

65

State Agreements-In-Principle | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Compliance » State Compliance » State Agreements-In-Principle State Agreements-In-Principle The EM Office of Regulatory Compliance coordinates within EM offices and other Departmental organizations to review proposed Agreements-in-Principle (AIPs) with States. We review proposed agreements and, if necessary, develop program policies to support Program and Field Office implementation of the AIP program. On December 22, 1995, EM-1 released the State Agreement-In-Principle Program Guidance Memorandum. The guidance memorandum has several attachments to it, including frequently asked questions and answers regarding AIPs, mandatory and optional provisions, and model language. On August 14, 1994, EM-1 released the Delegation of Authority Memorandum, which describes authorities for various financial assistance agreements. It

66

International Agreements/Collaborations  

Broader source: Energy.gov (indexed) [DOE]

Agreements/Collaborations US-China Clean Energy Research Center US-India Joint Clean Energy R&D Center Japan-US Clean Energy Technologies Action Plan US-China CERC * There are three, subject matter distinct, US-China Clean Energy Research Centers: * Advanced Coal; DOE Prime: WVU * Clean Vehicles; DOE Prime: U. of Michigan * Building Energy Efficiency; DOE Prime: LBNL * Each has formed teams of private participants, cost-sharing 50% * Factor of four leveraging of USDOE R&D dollars Advanced Coal CERC * Among key participants: * WVU, GE, Duke Energy, NETL, LANL, U of Wyoming, LLNL, U of Kentucky, PNNL, Babcock & Wilcox, LP Amina, Alstom * China Power Engineering Consulting Group Corp., Huaneng Power Int'l Inc., Tsingua Univ., Chinese Academy of Science, Yanchang

67

PERFORMANCE GUARANTEE AGREEMENT  

National Nuclear Security Administration (NNSA)

F F PERFORMANCE GUARANTEE SEE ATTACHED Appendix F - Page 308 PERFORMANCE GUARANTEE AGREEMENT For value received, and in consideration of, and in order to induce the United States (the Government) to enter into Contract DE-AC52-07NA27344 for the management and operation of the Lawrence Livermore National Laboratory (the "Contract") dated __________, by and between the Government and Lawrence Livermore National Security LLC (Contractor), the undersigned, Bechtel National, Inc. (Guarantor), a corporation incorporated in the State of Nevada with its principal place of business at 5275 Westview Drive, Frederick, Maryland 21703, hereby unconditionally guarantees to the Government (a) the full and prompt payment and performance of all obligations, accrued and executory, which Contractor presently or hereafter

68

PartnershipAgreementsTraining  

Broader source: Energy.gov (indexed) [DOE]

Partnership Partnership Agreements Delegation of SBA's Contract Execution Authority to other Federal Government Agencies 2 Overview n The Small Business Act (the Act) (15 U.S.C. §§ 636 (j) and 637)a)) authorizes the SBA to establish a business development program, known as the 8(a) Business Development Program. The specific sections of the Act are 7(j) and 8(a), hence the 8(a) Business Development Program (8(a) BD program). n The 8(a) BD program promotes the development of small business concerns owned and controlled by socially and economically disadvantaged individuals so that such concerns can compete in the mainstream of the American economy. 3 Overview n SBA is authorized to enter into all types of contracts with other Federal agencies and to contract the performance of these contracts

69

MSG MONTICELLO PROJECTS FEDERAL FACILITIES AGREEMENT REPORT  

Office of Legacy Management (LM)

FACILITIES AGREEMENT REPORT FACILITIES AGREEMENT REPORT Report Period: October 1- December 31, 2005 DOE Project Coordinator: Ray Plieness HIGHLIGHTS The Final Report-2005 Avian Wetland Surveys at the Monticello Mill Tailings Site and the Final Report-Monticello Mill Tailings Site Macroinvertebrate Sampling for 2005 were transmitted to the Environmental Protection Agency (EPA) and the Utah Department of Environmental Quality (UDEQ) on December 13. These reports are required under the Monticello Mill Tailings Site Operable Unit III Post-Record of Decision Monitoring Plan, Section 6.0 Biomonitoring Plan, to determine whether selenium levels are present in environmental media at concentrations that could cause adverse effects on ecological receptors. MRAP The draft-flnal2005 Annual Inspection of the Monticello Mill Tailings (USDOE) and

70

COORDINATORS Coordination Managers for First Responders  

E-Print Network [OSTI]

Guralnik Ryan VanRiper Honeywell Laboratories Tom.Wagner@honeywell.com Abstract COORDINATORs) and the Air Force Research Laboratory (AFRL) under agree- ment number F30602-03-C-0010 and by Honeywell or Honeywell Interna- tional. Figure 1. A Single COORDINATOR Running on an Off-The-Shelf Wireless PDA helping

Wagner, Thomas

71

EERE Financial Opportunities: Cooperative Agreements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Agreements Agreements Photo of a handshake. The Office of Energy Efficiency and Renewable Energy (EERE) also awards cooperative agreements to businesses, industries, universities, and others. Cooperative agreements are similar to grants, but they require more involvement on the part of the federal government. In work performed through cooperative agreements, the federal government exercises more control in technical implementation. This may include project collaboration, participation in project management, or intervention in the activity. The nature and extent of involvement is outlined in a "statement of substantial involvement" included in the financial opportunity announcement. Like grants, most cooperative agreements are awarded on a competitive basis.

72

Partnership Agreement Options | Partnerships | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Agreement For Commercializing Technology (ACT) CRADA Work For Others Agreement User Agreement Sample Sponsored Research Agreement SBIR-STTR Support Partnerships Home | Connect with ORNL | For Industry | Partnerships | Sponsored Research | Partnering Mechanism SHARE Partnering Mechanisms Exact Measurements Private companies, universities, non-profit agencies, and other non-federal entities seeking technology solutions or research and development partnerships have a number of mechanisms available for engaging ORNL in partnerships. These mechanisms are embodied in various types of partnering agreements that permit non-federal entities access to technologies, unique facilities, and cutting-edge expertise resident at ORNL. Different partnership agreements exist based on specific needs of the

73

Reliability-Centered Maintenance  

Broader source: Energy.gov [DOE]

Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance.

74

North American Electric Reliability Corporation (NERC): Reliability...  

Broader source: Energy.gov (indexed) [DOE]

and winter and summer forecasts; monitors the bulk power systems; and educates, trains, and certifies industry personnel. North American Electric Reliability Corporation...

75

ENVIRONMENTAL OVERSIGHT AND MONITORING AGREEMENT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OVERSIGHT AND MONITORING AGREEMENT OVERSIGHT AND MONITORING AGREEMENT (Agreement in Principle) Between the United States Department of Energy and the State of Idaho 1. This Agreement in Principle (Agreement) is voluntarily entered into by the United States Department of Energy (DOE), under the authority of 42 U.S.C. §71 01 et. seq., and the State of Idaho (State) under the authority of Article IV, Section S of the Idaho Constitution and Idaho Code § 39-10S. DOE's designated lead for purposes of this Agreement is the DOE's Idaho Operations Office (DOE-ID) and DOE's Naval Reactors Idaho Branch Office for Naval Nuclear Propulsion Program matters. The State's designated lead for purposes of this Agreement is the Department of Environmental Quality (DEQ). This Agreement replaces the Environmental Oversight and

76

Illinois State Historic Preservation Programmatic Agreement ...  

Energy Savers [EERE]

Illinois State Historic Preservation Programmatic Agreement Illinois State Historic Preservation Programmatic Agreement Fully executed programmatic agreement between DOE, State...

77

Partnership Agreement Options | Partnerships | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Support Partnerships Home | Connect with ORNL | For Industry | Partnerships | Sponsored Research | Partnering Mechanism SHARE Partnering Mechanisms Exact Measurements Agreement...

78

Insurance Services Coordinator  

E-Print Network [OSTI]

Insurance Services Coordinator (VACANT) Biosafety Specialist (S Crossan) Fire Protection Engineer (A Foote) Fire Protection Engineer (B Hamilton) OS&H Coordinator (VACANT) OS&H Coordinator (S Grosser Protection Engineer (M Bashore) Chief Fire Protection Engineer (K Lippincott) Business Specialist (S Stubbs

Lathrop, Daniel P.

79

South Valley Compliance Agreement Summary  

Broader source: Energy.gov (indexed) [DOE]

South Valley South Valley Agreement Name South Valley Superfund Site Interagency Agreement State New Mexico Agreement Type Compliance Agreement Legal Driver(s) CERCLA Scope Summary Interagency Agreement with the U.S. Air Force for payment of costs associated with the remediation of two operable units (the facility and San Jose 6) at the South Valley Superfund Site. Parties DOE; U.S. Air Force Date 9/26/1990 SCOPE * Set forth the actions required of the USAF and DOE to fulfill their respective responsibilities pursuant to the Settlement Agreement between DOE, USAF, and General Electric Company (8/29/1990). * Establish mechanism by which DOE will transfer, to a fund managed by the USAF, its share of the costs set forth in the Settlement Agreement. * Set forth each party's responsibilities and respective share of costs.

80

Secretaries Chu and Donovan Sign Agreement to Help Working Families  

Broader source: Energy.gov (indexed) [DOE]

Donovan Sign Agreement to Help Working Families Donovan Sign Agreement to Help Working Families Weatherize Their Homes Secretaries Chu and Donovan Sign Agreement to Help Working Families Weatherize Their Homes May 6, 2009 - 12:00am Addthis WASHINGTON - U.S. Department of Housing and Urban Development (HUD) Secretary Shaun Donovan and U.S. Department of Energy (DOE) Secretary Steven Chu today announced an important step forward in the partnership between HUD and DOE to streamline and better coordinate federal weatherization programs. These efforts will make it easier for low-income families to weatherize their homes, saving money for working families and creating tens of thousands of new green jobs. Today, the Secretaries signed a Memorandum of Understanding (MOU) to coordinate energy retrofit programs in the American Recovery and

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

New Agreement Makes Innovative NETL Simulator Training Available to  

Broader source: Energy.gov (indexed) [DOE]

Agreement Makes Innovative NETL Simulator Training Available to Agreement Makes Innovative NETL Simulator Training Available to Pierpont Students New Agreement Makes Innovative NETL Simulator Training Available to Pierpont Students January 17, 2013 - 12:00pm Addthis Washington, DC - Community and technical college students in West Virginia will learn about the safe, efficient, and reliable operation of clean energy plants utilizing unique simulator based training in a new agreement signed with the Office of Fossil Energy's National Energy Technology Laboratory (NETL). The agreement with Pierpont Community and Technical College in Fairmont, West Virginia, gives the school's students access to the high-fidelity, real-time dynamic simulators and 3-D virtual immersive training systems at the AVESTAR™ Center in Morgantown, W.Va. The training will assist Pierpont

82

Human Reliability Program Overview  

SciTech Connect (OSTI)

This presentation covers the high points of the Human Reliability Program, including certification/decertification, critical positions, due process, organizational structure, program components, personnel security, an overview of the US DOE reliability program, retirees and academia, and security program integration.

Bodin, Michael

2012-09-25T23:59:59.000Z

83

Power electronics reliability analysis.  

SciTech Connect (OSTI)

This report provides the DOE and industry with a general process for analyzing power electronics reliability. The analysis can help with understanding the main causes of failures, downtime, and cost and how to reduce them. One approach is to collect field maintenance data and use it directly to calculate reliability metrics related to each cause. Another approach is to model the functional structure of the equipment using a fault tree to derive system reliability from component reliability. Analysis of a fictitious device demonstrates the latter process. Optimization can use the resulting baseline model to decide how to improve reliability and/or lower costs. It is recommended that both electric utilities and equipment manufacturers make provisions to collect and share data in order to lay the groundwork for improving reliability into the future. Reliability analysis helps guide reliability improvements in hardware and software technology including condition monitoring and prognostics and health management.

Smith, Mark A.; Atcitty, Stanley

2009-12-01T23:59:59.000Z

84

NREL: Technology Transfer - Licensing Agreements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Licensing Agreements Licensing Agreements Through licensing agreements, NREL provides industry with an opportunity to commercialize NREL-developed energy technologies and products. Our licensing opportunities are available to both small and large businesses-from start-ups to Fortune 500 companies. Process The licensing agreement process basically includes seven steps. See the NREL Licensing Agreement Process flowchart. We are committed to working through these steps in a timely manner. Experience suggests that the fastest means to reach an agreement is through direct communications to create understanding and agree on actions. 1. Identify and Qualify Opportunity To identify an opportunity, a company can browse the technologies available for licensing. When an opportunity has been identified, NREL then asks the company to

85

NREL: Gearbox Reliability Collaborative - Gearbox Reliability Collaborative  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

All Members Meeting All Members Meeting The Gearbox Reliability Collaborative (GRC) All Members Meeting was held on February 4-5, 2013. The meeting covered advancements made across the NREL GRC project and the latest industry updates on gearbox reliability and operations and maintenance practices. The presentations covered gearbox design updates, gearbox testing updates, experimental data analysis, and operations and maintenance research. Presentations Monday, February 4 Time Presenter Organization Presentation 8:30 a.m. Paul Veers NREL Welcome 8:45 a.m. Mike Derby DOE Overview 9:05 a.m. Jon Keller NREL Gearbox Reliability Collaborative Status and Plans 9:20 a.m. Hal Link NREL New Gearbox #2 Test Plan 9:40 a.m. Hal Link NREL NWTC Dynos and Grid Simulator 10:00 a.m. Jon Keller/Brian McNiff NREL/MLI Gearbox Reliability Collaborative, Phase 3: High Speed Shaft Bearing Loads

86

Historic Preservation Executed Programmatic Agreements  

Broader source: Energy.gov [DOE]

Programmatic Agreements offer a more streamlined process for grantees to satisfy their historic preservation requirements with minimum or no consultation with the State Historic Preservation Officer based on the type of activity that is being undertaken. Below please find state-specific executed Programmatic Agreements. Executed agreements will apply to counties, municipalities and other local governments within the respective state receiving DOE's financial assistance awards to ensure comprehensive coverage of DOE's program grantees.

87

Agreements --Africa 27 28 Atlas of International Freshwater Agreements  

E-Print Network [OSTI]

Agreements -- Africa 27 AFRICA #12;28 Atlas of International Freshwater Agreements Congo/Zaire* Total area: 3,699,100 km2 Area of Basin in Country Countries km2 % Congo, Democratic Republic of (Kinshasa) 2,307,800 62.39 Central African Republic 402,000 10.87 Angola 291,500 7.88 Congo, Republic

Wolf, Aaron

88

Quick Guide: Power Purchase Agreements  

Broader source: Energy.gov [DOE]

Fact sheet explains on-site renewable power purchase agreements (PPAs) and includes which questions to ask when evaluating a PPA for a Federal renewable energy project.

89

NETL Partnership and Licensing Agreements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Partnerships and Licensing Options Available Technologies Partnerships and Licensing Success Stories Contact Us Cooperative Research and Development Agreement (CRADA) A CRADA...

90

Better Plants Partnership Agreement Form  

Broader source: Energy.gov [DOE]

The Better Buildings, Better Plants Partnership Agreement Form commits organizations to work with DOE to reduce energy intensity by 25% over ten years.

91

Project Management Coordination Office  

Broader source: Energy.gov [DOE]

The Project Management Coordination Office (PMCO) provides guidance, leadership, training, and tools to Office of Energy Efficiency and Renewable Energy (EERE) management and the field in the area...

92

Coordinate Descent Algorithms  

E-Print Network [OSTI]

a person's brain when they hear certain English words. Canutescu and Dunbrack [9] describe a cyclic coordinate descent method for determining protein...

2014-11-30T23:59:59.000Z

93

NREL: Performance and Reliability R&D - PV Module Reliability...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reliability R and D Printable Version PV Module Reliability Workshop NREL hosts an annual Photovoltaic Module Reliability Workshop (PVMRW) so that solar technology experts can...

94

Interconnection Agreements for Onsite Generation  

Broader source: Energy.gov (indexed) [DOE]

Interconnection Agreements Interconnection Agreements for Onsite Generation Office of Real Property Asset Management Office of General Counsel Real Property Division Richard R. Butterworth Senior Assistant General Counsel (202) 501-4436 richard.butterworth@gsa.gov The Problem: * Most agreements require indemnity clauses - usually either by tariff or by the submission of standard contracts to PSCs * Federal Government precluded from providing indemnity by: * Anti-deficiency Act - 31 U.S.C. 665(a) * Adequacy of Appropriations Act - 41 U.S.C. 11 GSA - Utility Interconnection Agreements GSA - Utility Interconnection Agreements * Exception: Utility Contracts * GAO decision sets the foundation for exception for utility contracts - 59 Comp. Gen. 705 * But it's a narrow exception

95

MRAP MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT  

Office of Legacy Management (LM)

MRAP MRAP MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT May/June 2005 Report Period: May 1 -June 30, 2005 DOE Project Coordinator: Art Kleinrath HIGHLIGHTS DOE constmction, as identified in the Millsite Restoration Plan, was substantially completed on June 3. Seeding of disturbed areas was completed on June 15. MSG DOE completed constmction of the permeable reactive treatment cell and initiated operations in June. The cell is an enhancement to the existing pe1meable reactive ban·ier and was designed to alleviate ground water mounding. MVP Approximately one cubic yard of contaminated material was identified in a City of Monticello excavation near the golf course. This material was transferred to the Temporary Storage Facility located at the DOE Monticello Office.

96

MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT  

Office of Legacy Management (LM)

August 2004 August 2004 Report Period: July 1- August 31, 2004 DOE Project Coordinator: Art Kleinrath HIGHLIGHTS Two monitoring wells were installed, which completed the monitoring network for OU III. The following documents have been completed: * · Monticello Mill Tailings Site Operable Unit III Post-Record of Decision Monitoring Plan * Remedial Action/Remedial Design Workplan for the Monticello Mill Tailings Site Operable Unit III MRAP DOE is continuing discussions with the City of Monticello concerning adequate restoration of the former millsite. On July 27, the DOE Contracting Officer wrote a letter insisting that the City of Monticello explain its plans to remedy the failure of the restoration of the Monticello Millsite as required under a Cooperative Agreement between the City and DOE.

97

Final Rocky Flats Cleanup Agreement, July 19, 1996 Summary  

Broader source: Energy.gov (indexed) [DOE]

Rocky Flats Cleanup Agreement Rocky Flats Cleanup Agreement State Colorado Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA/RCRA Scope Summary Establish the regulatory framework for achieving the ultimate cleanup of the Rocky Flats Site. Parties DOE; US EPA; The State of Colorado Date 7/19/1996 SCOPE * Establish the regulatory framework for achieving the ultimate cleanup of the Rocky Flats Site. * Ensure that the environmental impacts associated with activities at the Site will continue to be investigated and that appropriate response actions are taken. * Establish a procedural framework and schedule for developing, implementing, and monitoring appropriate response actions at the site. * Coordinate all of DOE's cleanup obligations under CERCLA, RCRA, and the Colorado

98

Definition: Interconnection Reliability Operating Limit Tv | Open Energy  

Open Energy Info (EERE)

Limit Tv Limit Tv Jump to: navigation, search Dictionary.png Interconnection Reliability Operating Limit Tv The maximum time that an Interconnection Reliability Operating Limit can be violated before the risk to the interconnection or other Reliability Coordinator Area(s) becomes greater than acceptable. Each Interconnection Reliability Operating Limit's Tv shall be less than or equal to 30 minutes.[1] Related Terms Interconnection Reliability Operating Limitinterconnection, interconnection References ↑ Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Interconnection_Reliability_Operating_Limit_Tv&oldid=493031

99

Energy Efficiency Loan Program Agreement Template | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Agreement Template Energy Efficiency Loan Program Agreement Template A template agreement demonstrating how to address the deposit and use of the loan loss reserve monies. Energy...

100

Energy Efficiency Loan Program Agreement Template | Department...  

Energy Savers [EERE]

Energy Efficiency Loan Program Agreement Template Energy Efficiency Loan Program Agreement Template An agreement demonstrating how to address the deposit and use of the loan loss...

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Power Purchase Agreements Update | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Agreements Update Power Purchase Agreements Update Presentation covers an update on power purchase agreements and is given at the Spring 2011 Federal Utility Partnership Working...

102

Timesharing Agreements | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Timesharing Agreements Timesharing Agreements Timesharing Agreements The Acquisition Management Division (IM-13) leads the teleprocessing services program which is a centrally managed Headquarters program and voluntary to the field offices to gain the advantages of reducing administrative overhead, obtaining more favorable rates and discounts, and providing resources variety to meet user needs. We maintain and are responsible for all acquisition, utilization, and administration of commercial timesharing services. Teleprocessing is utilized when they are the most effective and economical means of satisfying the needs of the program, function, or administrative activity being supported. This program currently saves the Department over $2.4M a year through voluntary field support and contract considerations.

103

OPEC agreement and its implications  

SciTech Connect (OSTI)

Following lengthy and intensive negotiations, OPEC recently reached agreement on new prices and production quotas. Although the agreement has been met by general skepticism, Bankers Trust believes that the chances of defending the new marker price are reasonably good. Saudi willingness to reduce oil production and earnings to shield less financially secure OPEC members from the full impact of production cuts provides added and much-needed strength to the organization. If indeed the OPEC agreement proves successful, product prices in the important US market may have already bottomed out.

Not Available

1983-01-01T23:59:59.000Z

104

Federal Facility Agreement progress report  

SciTech Connect (OSTI)

The (SRS) Federal Facility Agreement (FFA) was made effective by the US. Environmental Protection Agency Region IV (EPA) on August 16, 1993. To meet the reporting requirements in Section XXV of the Agreement, the FFA Progress Report was developed. The FFA Progress Report is the first of a series of quarterly progress reports to be prepared by the SRS. As such this report describes the information and action taken to September 30, 1993 on the SRS units identified for investigation and remediation in the Agreement. This includes; rubble pits, runoff basins, retention basin, seepage basin, burning pits, H-Area Tank 16, and spill areas.

Not Available

1993-10-01T23:59:59.000Z

105

AGREEMENT  

National Nuclear Security Administration (NNSA)

and decontaminates as required. Is responsible for pumping controlled waste to and from tanks, sumps and pits, and cleans transfer equipment involved. Uses all tools and equipment...

106

Medical Aspects of Reliability  

SciTech Connect (OSTI)

This presentation covers the medical evaluation as part of a human reliability program, particularly the various medical qualifications and potential disqualifiers.

Atencio, Julian J.

2014-05-05T23:59:59.000Z

107

GSA-Utility Interconnection Agreements  

Broader source: Energy.gov (indexed) [DOE]

Property Property Asset Management Office of General Counsel Real Property Division Richard R. Butterworth Senior Assistant General Counsel (202) 501-4436 richard.butterworth@gsa.gov The Problem: * Most agreements require indemnity clauses - usually either by tariff or by the submission of standard contracts to PSCs * Federal Government precluded from providing indemnity by: * Anti-deficiency Act - 31 U.S.C. 665(a) * Adequacy of Appropriations Act - 41 U.S.C. 11 GSA - Utility Interconnection Agreements GSA - Utility Interconnection Agreements Exception: Utility Contracts * GAO decision sets the foundation for exception for utility contracts - 59 Comp. Gen. 705 * But it's a narrow exception - B-197583, January 19, 1981 GSA - Utility Interconnection Agreements

108

Argonne TDC: Material Transfer Agreements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Material Transfer Agreements Material Transfer Agreements Materials produced by researchers at Argonne National Laboratory are often of interest to the private sector. Depending on the circumstances under which the material was developed, such material may be transferred to industry for a number of reasons (e.g., testing, feasibility studies, etc.). This transfer is usually temporary and can initiate a more formal working arrangement. At this time, TDC, in conjunction with Argonne's Legal Department, provides such agreements on an as-needed basis. If you would like to acquire material produced by Argonne researchers during the course of a federally funded research project, please contact TDC or fill out a Material Transfer Agreement request form. Printed or electronically downloaded copies may become obsolete. Before using such a copy for work direction, employees must verify that it is current by comparing its revision number with that of the online version. Obsolete forms will be rejected.

109

Master Safeguards and Security Agreements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish the Department of Energy policy, requirements, responsibilities, and authorities for the development and implementation of Master Safeguards and Security Agreements (MSSA's). Does not cancel another directive. Canceled by DOE O 5630.13A

1988-02-03T23:59:59.000Z

110

ANHSC/NMFS Harbor seal agreement AGREEMENT BETWEEN  

E-Print Network [OSTI]

, NMFS is mandated to prevent marine mammal stocks from diminishing beyond the point at which they cease and Coordination with Indian Tribal Governments," 63 FR 27655), Presidential Memorandum of April 29, 1994 of Commerce Memorandum "American Indian and Alaska Native Policy of the U.S. Department of Commerce" of March

111

Hawaii electric system reliability.  

SciTech Connect (OSTI)

This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability %E2%80%9Cworth%E2%80%9D and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

Silva Monroy, Cesar Augusto; Loose, Verne William

2012-09-01T23:59:59.000Z

112

Clean Cities: Coordinator Toolbox  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Coordinator Toolbox Coordinator Toolbox The Coordinator Toolbox helps Clean Cities coordinators build successful, thriving coalitions. Use these tools to simplify complex tasks, improve communications with stakeholders, and stay informed about the Clean Cities program. Previous Next Photo of a vehicle on the road - Clean Cities 2014 Vehicle Buyer's Guide The new light-duty lineup Use the Clean Cities 2014 Vehicle Buyer's Guide to let consumers and stakeholders know about the latest options in alternative fuel vehicles and hybrids. Photo of an iPhone Alternative fuels, to go Download the new Alternative Fueling Station Locator iPhone app from the App Store. Clean Cities Blog Stay current on alternative transportation topics Check out the Clean Cities blog for weekly facts you can share with stakeholders about Clean Cities' successes.

113

Palaeoclimate Coordinating Lead Authors  

E-Print Network [OSTI]

6 Palaeoclimate Coordinating Lead Authors: Eystein Jansen (Norway), Jonathan Overpeck (USA) Lead (UK) This chapter should be cited as: Jansen, E., J. Overpeck, K.R. Briffa, J.-C. Duplessy, F. Joos, V

114

Kairoscope : coordinating time socially  

E-Print Network [OSTI]

If everyone says time is relative, why is it still so rigidly defined? There have been many attempts to address the issue of coordinating schedules, but each of these attempts runs into an issue of rigidity: in order to ...

Martin, Reed Eric

2010-01-01T23:59:59.000Z

115

LFS Subcontract Form of Agreement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SFA (Rev. 5, 4/5/13) Subcontract Form of Agreement SFA (Rev. 5, 4/5/13) Subcontract Form of Agreement Dated 5-20-13 Subcontract No. 241314 Page 1 of 2 Subcontract Form of Agreement Subcontractor: TBD Subcontract No.: 241314 Address: * Contact: * Telephone: * Facsimile: * E-mail: * D-U-N-S No.: * NAICS Code: 334111 This subcontract, effective on the date of signature by the last party to sign, is hereby made and entered into by and between Los Alamos National Security, LLC (CONTRACTOR), and the above named SUBCONTRACTOR who hereby agree that all Work specified below, which is a portion of the goods and services to be provided by CONTRACTOR for the United States Department of Energy National Nuclear Security Administration (OWNER), shall be performed by the SUBCONTRACTOR in accordance with all

116

Reliability Standards Owner  

Broader source: Energy.gov [DOE]

This position is located in the Internal Operations and Asset Management group of Planning and Asset Management (TP). A successful candidate in this position will serve as the Reliability Standards...

117

NREL: Gearbox Reliability Collaborative - Gearbox Reliability Collaborative  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects Projects Gearbox deficiencies are the result of many factors. Through gearbox modeling and testing, condition monitoring, and the failure database, the collaborative is expanding the industry's knowledge base, recommending efficient and cost-effective improvements, and facilitating immediate improvements in the gearbox life cycle. Gearbox Modeling and Testing Illustration of representative gearbox including the hub, main bearing, main shaft, gearbox, brake, high speed shaft, generator, and bed plate. A complete gearbox redesign has been completed in a collaborative effort between NREL and industry partners. This process documented and analyzed the design process and produced a new gearbox design that integrates knowledge from previous Gearbox Reliability Collaborative (GRC) activities.

118

GovEnergy 2008 Session Presentation on Power Purchase Agreements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Agreements Agreements Power Purchase Agreements for for Renewable Energy Renewable Energy Jim Snook Steve Dumont Jim Snook Steve Dumont Mike Warwick Mike Warwick AFCESA/CENF AFCESA/CENF ACC/A7OE PNNL ACC/A7OE PNNL U.S. Air Force U.S. Air Force U.S. Air Force U.S. Air Force Pacific NW Pacific NW National Lab National Lab AGENDA * PPA Basics * PPA "How to" Guide * Nellis Experience * Ft. Carson Experience Renewable Energy Projects * Objective: Develop renewable generation - Reduce fossil fuel use & foreign oil dependence - Meet Federal renewable energy goals (EPAct, Executive Order 13423, etc) - Reduce and stabilize utility costs - Improve energy supply security & reliability Renewable Energy Projects * Key requirements

119

GovEnergy 2008 Session Presentation on Power Purchase Agreements  

Broader source: Energy.gov (indexed) [DOE]

Agreements Agreements Power Purchase Agreements for for Renewable Energy Renewable Energy Jim Snook Steve Dumont Jim Snook Steve Dumont Mike Warwick Mike Warwick AFCESA/CENF AFCESA/CENF ACC/A7OE PNNL ACC/A7OE PNNL U.S. Air Force U.S. Air Force U.S. Air Force U.S. Air Force Pacific NW Pacific NW National Lab National Lab AGENDA * PPA Basics * PPA "How to" Guide * Nellis Experience * Ft. Carson Experience Renewable Energy Projects * Objective: Develop renewable generation - Reduce fossil fuel use & foreign oil dependence - Meet Federal renewable energy goals (EPAct, Executive Order 13423, etc) - Reduce and stabilize utility costs - Improve energy supply security & reliability Renewable Energy Projects * Key requirements

120

INTERNATIONAL SPACE EXPLORATION COORDINATION GROUP  

E-Print Network [OSTI]

exploration coordination tool to enhance the implementation of the coordination process At the 1st ISECG1 INTERNATIONAL SPACE EXPLORATION COORDINATION GROUP WORKPLAN Update following 3rd ISECG Meeting broader future participation in the planning and coordination process; - assessment of the requirements

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Midterm Picnic New CIP Coordinator  

E-Print Network [OSTI]

Highlights Midterm Picnic New CIP Coordinator Birthdays Manners TheELIWeekly Midterm Picnic and say goodbye! New CIP Coordinator The ELI is conducting a nation-wide search for a new CIP Coordinator. Fortunately, Nate Bloemke has agreed to be the Interim CIP Coordinator until our search is over. Thank you

Pilyugin, Sergei S.

122

Steering Committee Coordination and Integration  

E-Print Network [OSTI]

Management Identify Issues Suggest Solutions Coordinate Training Liaison with CSU Collaborative (SAFT

de Lijser, Peter

123

Gearbox Reliability Collaborative Update (Presentation)  

SciTech Connect (OSTI)

This presentation was given at the Sandia Reliability Workshop in August 2013 and provides information on current statistics, a status update, next steps, and other reliability research and development activities related to the Gearbox Reliability Collaborative.

Sheng, S.

2013-10-01T23:59:59.000Z

124

Parametric probability distributions in reliability  

E-Print Network [OSTI]

Parametric probability distributions in reliability F.P.A. Coolen Department of Mathematical parametric probability distributions which are frequently used in reliability. We present some main as models for specific reliability scenarios. Keywords: Binomial distribution, Exponential distribution

Coolen, Frank

125

Piketon Site Partnering Agreement 2011  

Broader source: Energy.gov (indexed) [DOE]

Fluor-B&W I Fluor-B&W I Portsmouth" Restoration Services. Inc. B:W conversion serVices, Ie ~~WEMS Wastren-EnergX Mission Support, LLC Piketon Site Partnering Agreement 2011 O n behalf of the taxpayers of this nation and the communities of the four counties surrounding the former Gaseous Diffusion Plant Site in Piketon, Ohio, we, the U.S. Department of Energy and its Prime Contractors, stand together as One Site Team. We enter into this Partnering Agreement with the conviction and shared responsibility to operate and clean up the Piketon Site safely and efficiently -- while protecting the public health and the environment. We believe that - only together - can we return the Site to the community as a platform for sustainable regional growth and new jobs.

126

Block coordination copolymers  

DOE Patents [OSTI]

The present invention provides compositions of crystalline coordination copolymers wherein multiple organic molecules are assembled to produce porous framework materials with layered or core-shell structures. These materials are synthesized by sequential growth techniques such as the seed growth technique. In addition, the invention provides a simple procedure for controlling functionality.

Koh, Kyoung Moo; Wong-Foy, Antek G; Matzger, Adam J; Benin, Annabelle I; Willis, Richard R

2014-11-11T23:59:59.000Z

127

Brief Coordinated passivation designs  

Science Journals Connector (OSTI)

In two-input (or multi-input) nonlinear systems it may be possible to achieve feedback passivation of a chosen input using the second input (other inputs) to improve the stability properties of the first input's zero dynamics. This 'coordinated passivation' ... Keywords: Nonlinear passivation, Turbocharged diesel engine, Zero dynamics

Michael Larsen; Mrdjan Jankovi?; Petar V. Kokotovi?

2003-02-01T23:59:59.000Z

128

ENERGY STAR EEPS Partnership Agreement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Approval expires 02/29/2016 1 EPA Form No. 5900-33 ENERGY STAR Partnership Agreement Instructions for Partnering with ENERGY STAR ® As an Energy Efficiency Program Sponsor Organizations interested in partnering with ENERGY STAR as an Energy Efficiency Program Sponsor should take the following steps: 1. Review the Energy Efficiency Program Sponsors Program Definitions and Program Requirements documents. 2. Select the area(s) of interest for a new partnership on the Participation Form. Please

129

K-25: Historic Preservation Agreement  

Broader source: Energy.gov [DOE]

In a ceremony attended by representatives of federal, state, and local historic preservation groups, the U.S. Department of Energy announced the formal completion of an agreement that will preserve the historic contributions of Oak Ridge's K-25 site to the World War II Manhattan Project. In this video, Oak Ridge Historian Bill Wilcox explores the contributions the K-25 project gave to our country and the importance of preserving this legacy for the benefit of future generations.

130

Wind Plant Collector System Fault Protection and Coordination  

SciTech Connect (OSTI)

This paper presents a summary of the most important protection and coordination considerations for wind power plants. Short-circuit characteristics of both aggregate wind plant and individual wind turbine genera- tors, as well as general interconnection protection requirements are discussed. Many factors such as security, reliability, and safety are considered for proper conservative protection of the wind power plant and individual turbines.

Bradt, M. [IEEE PES Wind Plant Collector System Design Working Group; Behnke, M. R. [IEEE PES Wind Plant Collector System Design Working Group; Bloethe, W.G. [IEEE PES Wind Plant Collector System Design Working Group; Brooks, C. [IEEE PES Wind Plant Collector System Design Working Group; Camm, E H [IEEE PES Wind Plant Collector System Design Working Group; Dilling, W. [IEEE PES Wind Plant Collector System Design Working Group; Goltz, B. [IEEE PES Wind Plant Collector System Design Working Group; Li, J. [IEEE PES Wind Plant Collector System Design Working Group; Niemira, J. [IEEE PES Wind Plant Collector System Design Working Group; Nuckles, K. [IEEE PES Wind Plant Collector System Design Working Group; Patino, J. [IEEE PES Wind Plant Collector System Design Working Group; Reza, M [IEEE PES Wind Plant Collector System Design Working Group; Richardson, B. [IEEE PES Wind Plant Collector System Design Working Group; Samaan, N. [IEEE PES Wind Plant Collector System Design Working Group; Schoene, Jens [IEEE PES Wind Plant Collector System Design Working Group; Smith, Travis M [ORNL; Snyder, Isabelle B [ORNL; Starke, Michael R [ORNL; Walling, R. [IEEE PES Wind Plant Collector System Design Working Group; Zahalka, G. [IEEE PES Wind Plant Collector System Design Working Group

2010-01-01T23:59:59.000Z

131

Advanced Collaborative Emissions Study (ACES) NETL Agreement...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

NETL Agreement 13919 Advanced Collaborative Emissions Study (ACES) NETL Agreement 13919 Presentation from the U.S. DOE Office of Vehicle Technologies "Mega" Merit Review 2008 on...

132

Notice, Revised Classified Information Nondisclosure Agreement...  

Broader source: Energy.gov (indexed) [DOE]

Notice, Revised Classified Information Nondisclosure Agreement - July 2013 Notice, Revised Classified Information Nondisclosure Agreement - July 2013 August 29, 2013 - 4:19pm...

133

Template Implementing Agreement | Open Energy Information  

Open Energy Info (EERE)

Implementing Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Template Implementing AgreementLegal Published NA Year...

134

ACHP - Nationwide Programmatic Agreements | Open Energy Information  

Open Energy Info (EERE)

Agreements Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: ACHP - Nationwide Programmatic Agreements Abstract This webpage lists the...

135

2013 Reliability & Markets Peer Review - Day 1 Presentations | Department  

Broader source: Energy.gov (indexed) [DOE]

2013 Reliability & Markets Peer Review - Day 1 Presentations 2013 Reliability & Markets Peer Review - Day 1 Presentations 2013 Reliability & Markets Peer Review - Day 1 Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on August 6 - 7, 2013. Presentations from Day 1 (Sessions I through IV) are available below. Session I: Ben Hobbs (Johns Hopkins), Kameshwar Poolla (UC Berkeley) Session II: Ray Zimmerman (Cornell), Hsiao-Dong Chiang (Cornell) Session III: Shmuel Oren (UC Berkeley), Dan Tylavsky (U Arizona), Tom Overbye (U Illinois) Session IV: Lindsay Anderson (Cornell), HyungSeon Oh (Cornell) 2013 R&M Peer Review - Assessing Transmission Investments Under Uncertainty - Ben Hobbs, Johns Hopkins 2013 R&M Peer Review - Coordinated Aggregation of Distributed Energy

136

Granite Reliable Power | Open Energy Information  

Open Energy Info (EERE)

Reliable Power Reliable Power Jump to: navigation, search Name Granite Reliable Power Facility Granite Reliable Power Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Brookfield Renewable Energy Group Developer Brookfield Renewable Energy Group Energy Purchaser Green Mountain Power / Central Vermont Public Service / New England Power Pool Location Milan NH Coordinates 44.74039314°, -71.28376007° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.74039314,"lon":-71.28376007,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

137

Reliable quantum computers  

Science Journals Connector (OSTI)

...the performance of a useful quantum computer will need to be. And that in itself...by the Department of Energy under Grant No. DE- FG03-92-ER40701, and...Lond. A (1998) Reliable quantum computers 409 References Aharonov, D. & Ben-Or...

1998-01-01T23:59:59.000Z

138

Wood Durability Service & Reliability  

E-Print Network [OSTI]

Wood Durability Laboratory Service & Reliability Equipment & Facilities Field sites for AWPA E-7 (mold) tests. Wood weathering facilities. Lab-scale pressure treating cylin- ders. X-ray preservative analyzer (Oxford Twin-X). State-of-the-art facilities for wood and plastics composites manufacturing

139

New Hampshire State Historic Preservation Programmatic Agreement  

Broader source: Energy.gov [DOE]

Fully executed programmatic agreement between DOE, State Energy Office and State Historic Preservation Office.

140

Iowa State Historic Preservation Programmatic Agreement  

Broader source: Energy.gov [DOE]

Fully executed programmatic agreement between DOE, State Energy Office and State Historic Preservation Office.

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

California State Historic Preservation Programmatic Agreement  

Broader source: Energy.gov [DOE]

Fully executed programmatic agreement between DOE, State Energy Office and State Historic Preservation Office.

142

Oklahoma State Historic Preservation Programmatic Agreement  

Broader source: Energy.gov [DOE]

Fully executed programmatic agreement between DOE, State Energy Office and State Historic Preservation Office.

143

Virginia State Historic Preservation Programmatic Agreement  

Broader source: Energy.gov [DOE]

Fully executed programmatic agreement between DOE, State Energy Office and State Historic Preservation Office.

144

Michigan State Historic Preservation Programmatic Agreement  

Broader source: Energy.gov [DOE]

Fully executed programmatic agreement between DOE, State Energy Office and State Historic Preservation Office.

145

Ohio State Historic Preservation Programmatic Agreement  

Broader source: Energy.gov [DOE]

Fully executed programmatic agreement between DOE, State Energy Office and State Historic Preservation Office.

146

South Dakota State Historic Preservation Programmatic Agreement  

Broader source: Energy.gov [DOE]

Fully executed programmatic agreement between DOE, State Energy Office and State Historic Preservation Office.

147

Washington State Historic Preservation Programmatic Agreement  

Broader source: Energy.gov [DOE]

Fully executed programmatic agreement between DOE, State Energy Office and State Historic Preservation Office.

148

Indiana State Historic Preservation Programmatic Agreement  

Broader source: Energy.gov [DOE]

Fully executed programmatic agreement between DOE, State Energy Office and State Historic Preservation Office.

149

North Carolina State Historic Preservation Programmatic Agreement  

Broader source: Energy.gov [DOE]

Fully executed programmatic agreement between DOE, State Energy Office and State Historic Preservation Office.

150

Maryland State Historic Preservation Programmatic Agreement  

Broader source: Energy.gov [DOE]

Fully executed programmatic agreement between DOE, State Energy Office and State Historic Preservation Office.

151

Energy Efficiency Loan Program Agreement Template  

Office of Environmental Management (EM)

Program Name Energy Efficiency Loan Program Agreement CityCounty of , and Bank , 2010 ENERGY EFFICIENCY...

152

North American Electric Reliability Corporation Interconnections...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

North American Electric Reliability Corporation Interconnections North American Electric Reliability Corporation Interconnections Map of the North American Electric Reliability...

153

AEO2011: Electric Power Projections for EMM Region - Florida Reliability  

Open Energy Info (EERE)

Florida Reliability Florida Reliability Coordinating Council Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 74, and contains only the reference case. The data is broken down into electric power sector, cumulative planned additions,cumulative unplanned additions,cumulative retirements, end-use sector, electricity sales, net energy for load, generation by fuel type and price by service category. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO EIA Electric Power Florida projections Data application/vnd.ms-excel icon AEO2011: Electric Power Projections for EMM Region - Florida Reliability Coordinating Council- Reference Case (xls, 259.3 KiB)

154

AEO2011: Renewable Energy Generation by Fuel - Florida Reliability  

Open Energy Info (EERE)

Florida Reliability Florida Reliability Coordinating Council Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 99, and contains only the reference case. The dataset uses gigawatts, billion kilowatthours and quadrillion Btu. The data is broken down into generating capacity, electricity generation and energy consumption. Source EIA Date Released July 20th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO EIA Energy Generation Florida Fuel Data application/vnd.ms-excel icon AEO2011: Renewable Energy Generation by Fuel - Florida Reliability Coordinating Council- Reference Case (xls, 118.9 KiB) Quality Metrics Level of Review Peer Reviewed

155

Reliability of Electrical Interconnects (Presentation)  

SciTech Connect (OSTI)

This presentation discusses the status of NREL's research on the reliability of electrical interconnects.

Devoto, D.

2014-06-01T23:59:59.000Z

156

NREL: Technology Transfer - Technology Partnership Agreements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Technology Partnership Agreements Technology Partnership Agreements Through technology partnership agreements, NREL provides partners with technical support to help commercialize and deploy energy technologies and products. We do not fund any projects under a technology partnership agreement. The partner provides the necessary resources and covers our costs of providing technical services. NREL does provide funding opportunities through competitively placed contracts. For more information, see our business opportunities. Process The technology partnership agreement process basically includes 11 steps. See the NREL Technology Partnership Agreement Process flowchart. We are committed to working through these steps in a timely manner. Experience suggests that the fastest means to reach an agreement is through

157

System reliability: An example of nuclear reactor system analysis  

Science Journals Connector (OSTI)

This paper presents an overview of the three reliability investigations of a 900 \\{MWe\\} reactor residual heat removal system. Following a description of the system and its functions, the main procedures used in operational reliability analysis, based on the analysis of occurence records, are covered. The second part of the investigations covers predicted reliability, involving the use of the Markov method. It will be noted that the two types of analysis are in good agreement, the probability of system loss after two months' operation being of the order of 10?1. Additional investigation data are also given.

R. Coudray; J.M. Mattei

1984-01-01T23:59:59.000Z

158

Human Reliability Program Workshop  

SciTech Connect (OSTI)

A Human Reliability Program (HRP) is designed to protect national security as well as worker and public safety by continuously evaluating the reliability of those who have access to sensitive materials, facilities, and programs. Some elements of a site HRP include systematic (1) supervisory reviews, (2) medical and psychological assessments, (3) management evaluations, (4) personnel security reviews, and (4) training of HRP staff and critical positions. Over the years of implementing an HRP, the Department of Energy (DOE) has faced various challenges and overcome obstacles. During this 4-day activity, participants will examine programs that mitigate threats to nuclear security and the insider threat to include HRP, Nuclear Security Culture (NSC) Enhancement, and Employee Assistance Programs. The focus will be to develop an understanding of the need for a systematic HRP and to discuss challenges and best practices associated with mitigating the insider threat.

Landers, John; Rogers, Erin; Gerke, Gretchen

2014-05-18T23:59:59.000Z

159

User Agreements | Stanford Synchrotron Radiation Lightsource  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Agreements Agreements Institutional Agreements Required to Access DOE National User Facilities In recognition of the nation's expanding need to engage businesses and universities in the areas of commercial and basic science research, the Department of Energy (DOE) has developed two special types of agreements for use at all DOE National Laboratories with approved designated user facilities, see http://www.gc.doe.gov/1002.htm. Non-Proprietary User Agreement (PDF) (General User Agreement; no cost for general users) Proprietary User Agreement (PDF) (For Confidential or Proprietary Research; also requires advance payment) A User Agreement is required for all users and must be executed by the appropriate institutional officer(s) at the user's institution. A single User Agreement covers all experimenters from that institution (User

160

Rocky Flats Cleanup Agreement implementation successes and challenges  

SciTech Connect (OSTI)

On July 19, 1996 the US Department of Energy (DOE), State of Colorado (CDPHE), and US Environmental Protection Agency (EPA) entered into an agreement called the Rocky Flats Cleanup Agreement (RFCA) for the cleanup and closure of the Rocky Flats Environmental Technology Site (RFETS or Rocky Flats). Major elements of the agreement include: an Integrated Site-Wide Baseline; up to twelve significant enforceable milestones per year; agreed upon soil and water action levels and standards for cleanup; open space as the likely foreseeable land use; the plutonium and TRU waste removed by 2015; streamlined regulatory process; agreement with the Defense Nuclear Facilities Safety Board (DNFSB) to coordinate activities; and a risk reduction focus. Successful implementation of RFCA requires a substantial effort by the parties to change their way of thinking about RFETS and meet the deliverables and commitments. Substantial progress toward Site closure through the implementation of RFCA has been accomplished in the short time since the signing, yet much remains to be done. Much can be learned from the Rocky Flats experience by other facilities in similar situations.

Shelton, D.C.

1997-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Whistleblower Protection and Nondisclosure Agreements | Department of  

Broader source: Energy.gov (indexed) [DOE]

Whistleblower Protection and Nondisclosure Agreements Whistleblower Protection and Nondisclosure Agreements Whistleblower Protection and Nondisclosure Agreements Important Notice Concerning Nondisclosure Acknowledgments or Agreements (NDAs) with the Department of Energy: Whistleblower Protection Enhancement Act of 2012 Required Statement Regarding Nondisclosure Agreements: Pursuant to the Whistleblower Protection Enhancement Act of 2012, the following statement applies to every nondisclosure policy, form, or agreement of the Government (with current or former federal employees), including those in effect before the Act's effective date of December 27, 2012: "These provisions are consistent with and do not supersede, conflict with, or otherwise alter the employee obligations, rights, or liabilities created

162

Chapter 14 - Grants and Cooperative Agreements  

Broader source: Energy.gov (indexed) [DOE]

02-06-12 14-1 CHAPTER 14 GRANTS, COOPERATIVE AGREEMENTS, AND TECHNOLOGY INVESTMENT AGREEMENTS 1. INTRODUCTION. Grants, cooperative agreements, and technology investment agreements are financial assistance instruments, rather than acquisition instruments, used by the Department of Energy (DOE) to transfer money or property to a recipient to accomplish a public purpose authorized by Federal statute. a. Purpose. This chapter prescribes policies and general procedures for the accounting and financial management of grants, cooperative agreements and technology investment agreements administered by DOE. b. Applicability. This chapter applies to all Departmental elements, including the National Nuclear Security Administration (NNSA). It does not apply to

163

Interagency Coordination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

About the Program » Interagency Coordination About the Program » Interagency Coordination Interagency Coordination October 8, 2013 - 1:27pm Addthis The U.S. Department of Energy's Federal Energy Management Program (FEMP) works closely with Federal agencies and partner organizations to coordinate interagency efforts surrounding Federal energy management planning and legislation compliance. This interagency coordination takes shape through the following FEMP committees and working groups. Interagency Energy Management Task Force Federal Technology Deployment Working Group Federal Utility Partnership Working Group (FUPWG) Interagency Sustainability Working Group (ISWG) INTERFUEL Working Group Product Procurement Working Group Renewable Energy Working Group Addthis FEMP Home About the Program Plans, Implementation & Results

164

Substation Configuration Reliability 1 Reliability of Substation Configurations  

E-Print Network [OSTI]

Substation Configuration Reliability 1 Reliability of Substation Configurations Daniel Nack, Iowa substation, it still contains what could be described as weak points or points of failure that would lead to loss of load. By knowing how to calculate the reliability of different substation configurations

McCalley, James D.

165

Increasing the Reliability of Reliability Jochen Brocker1,  

E-Print Network [OSTI]

Increasing the Reliability of Reliability Diagrams Jochen Br¨ocker1, and Leonard A. Smith1,2 1 University Oxford, UK Corresponding Author, cats@lse.ac.uk November 9, 2006 #12;Abstract The reliability; for the most part, ambiguities arise from variation in the distribution of forecast probabilities and from

Stevenson, Paul

166

Reliability Calculus: A Theoretical Framework To Analyze Communication Reliability  

E-Print Network [OSTI]

distribution function (CDF) of the message delays can be used as a metric to infer communication reliability. Note that the communication reliability (end-to-end delay distribution) depends on the delay-to-end delay distribution over possible routes and under different protocols to provide reliability or quality

Liu, Xue

167

The General Agreement on Trade in Services  

Science Journals Connector (OSTI)

The significance of the General Agreement on Trade in Services (GATS)1 cannot be overestimated. For the first time in history, this framework agreement extends multilaterally agreed commitments and rules to the...

Mary E. Footer; Carol George

2005-01-01T23:59:59.000Z

168

Cooperative Agreement Awarded | Department of Energy  

Energy Savers [EERE]

Cooperative Agreement Awarded Cooperative Agreement Awarded September 28, 2012 - 12:00pm Addthis Media Contact Bill Taylor bill.taylor@srs.gov 803-952-8564 Cincinnati - The...

169

Fundamentals of Structural Reliability Theory  

Science Journals Connector (OSTI)

Structural reliability analysis differs in many important ways from reliability analysis as practised in, for example, the electronics and aero-space industries, in spite of the fact that the underlying probab...

Palle Thoft-Christensen Ph. D.

1982-01-01T23:59:59.000Z

170

MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS |  

Broader source: Energy.gov (indexed) [DOE]

MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS The DOE Office of Enforcement and Investigation (EH Enforcement) invoked a 120-day suspension of PAAA enforcement actions for issues associated with contractor Internal Dose Evaluation Programs (IDEP). Prior to initiation of the suspension, EH Enforcement had identified deficiencies in DOEcontractor implemented bioassay programs at numerous sites within the DOE complex. The commonality of the IDEP deficiencies at the various sites, as well as the possibility of the existence of similar deficiencies at other DOE sites, led EH Enforcement to the conclusion that a suspension of enforcement actions would be appropriate to provide DOE-contractors an opportunity to review their own

171

MEMORANDUM OF AGREEMENT THE UNIVERSITY OF CONNECTICUT  

E-Print Network [OSTI]

MEMORANDUM OF AGREEMENT BETWEEN THE UNIVERSITY OF CONNECTICUT AND THE UNIVERSITY OF CONNECTICUT into between the University of Connecticut ("University") and the UniversityofConnecticutChapterof the American Agreement This is an agreement between the University ofConnecticut ("University') and ("Faculty Member

Alpay, S. Pamir

172

FIELD RELIABILITY OF ELECTRONIC SYSTEMS  

E-Print Network [OSTI]

: ELECTRONIC EQUIPMENT; FAILURES; RELIABILITY; RISK ANALYSIS; SYSTEM ANALYSIS UDC: 621.38.004.64 ISBN 87 Predicted and Observed Reliability 16 3.3. Source 3 16 3.3.1. Description (Reactor Gamma Monitor) 16 3I Ww i 1 i FIELD RELIABILITY OF ELECTRONIC SYSTEMS wcwotoias R I S 0 - M - 2 4 1 8 An analytical

173

Testing for PV Reliability (Presentation)  

SciTech Connect (OSTI)

The DOE SUNSHOT workshop is seeking input from the community about PV reliability and how the DOE might address gaps in understanding. This presentation describes the types of testing that are needed for PV reliability and introduces a discussion to identify gaps in our understanding of PV reliability testing.

Kurtz, S.; Bansal, S.

2014-09-01T23:59:59.000Z

174

Coordinated EV Adoption: Double-Digit Reductions in Emissions and Fuel Use for $40/Vehicle-Year  

Science Journals Connector (OSTI)

The Eastern Interconnection comprises six regions, each of which are modeled separately in this study: Florida Reliability Coordinating Council (FRCC), Southeast Electric Reliability Council (SERC), Reliability First Corporation (RFC), Southwest Power Pool (SPP), and United States portions of Midwest Reliability Organization (MRO) and Northeast Power Coordinating Council (NPCC). ... The linking of CV fuel efficiency standards with EV adoption rates does provide flexibility in meeting the standard and may also support development and adoption of EV technologies. ... using COPERT software: 167112 TJ of fossil fuel energy, 12213 kton of CO2 emission and 141 kton of CO, 20 kton of HC, 46 kton of NOx and 3 kton of PM. ...

Dong Gu Choi; Frank Kreikebaum; Valerie M. Thomas; Deepak Divan

2013-07-22T23:59:59.000Z

175

TELEWORK RENEWAL AGREEMENT The telework agreement between ______ (hereinafter referred to as "Employee"),  

E-Print Network [OSTI]

TELEWORK RENEWAL AGREEMENT The telework agreement between and conditions originally agreed upon shall remain in effect for the renewal period. The responsibilities

Adali, Tulay

176

Collective Bargaining Agreement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Collective Bargaining Agreement Collective Bargaining Agreement Collective Bargaining Agreement This collective bargaining agreement is entered into to prescribe certain rights and obligations of the employees of the Department of Energy (DOE) Headquarters represented by the National Treasury Employees Union and to delineate procedures which are designed to meet the special requirements and needs of DOE Headquarters. The provisions of this agreement have been negotiated and should be interpreted in a manner consistent with the requirements of an effective and efficient Department. The Department of Energy (DOE) Headquarters and the National Treasury Employees Union are dedicated to partnership efforts designed to assure success for our respective organizations and to maintain a cooperative and constructive

177

Building & Site Services Coordination  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FAQs FAQs Conference Center and APS Site Activity Coordination Management and/or Coordination of APS Site Work/Services Safety & Emergency Management Database Maintenance Personnel Building and Site Services Coordination "We're at the End of our Pagers" The mission of the Building & Site Services Coordination is to efficiently manage and minimize the impact of APS building and site activities and to provide optimal support to APS staff and users in all 400 buildings and areas. FAQs Conference Center and APS Site Activity Coordination Locations Reservations Setups Visits & Tours Management and/or Coordination of APS Site Work/Services Work Entry Clearances Utility Shutdowns Telephone System Rigging Stockroom Office Furniture Installation Safety & Emergency Management

178

Argonne User Facility Agreements | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Master proprietary agreement sample (pdf) Master proprietary agreement sample (pdf) Master non-proprietary agreement sample (pdf) Differences between non-proprietary and proprietary Opens in a new window Argonne's National User Facilities Advanced Leadership Computing Facility (ALCF) Advanced Photon Source (APS) Argonne Tandem Linear Accelerator System (ATLAS) Center for Nanoscale Materials (CNM) Electron Microscopy Center (EMC) Argonne User Facility Agreements About User Agreements If you are not an Argonne National Laboratory employee, a user agreement signed by your home institution is a prerequisite for experimental work at any of Argonne's user facilities. The Department of Energy recently formulated master agreements that cover liability, intellectual property, and financial issues (access templates from the links in the left

179

User Agreement and Proprietary Account Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

User Agreement and Proprietary Account Status (04-Oct-2013) User Agreement and Proprietary Account Status (04-Oct-2013) Listed below are the 562 institutions that have signed APS User Agreements as financially contributing CAT members (indicated by CAT acronyms) and/or as non-members (indicated by "GU") as of (04-Oct-2013). A CAT Agreement covers users' activities at that CAT's beam lines; a GU Agreement covers users' activities at any APS beam line. All listed Agreements are nonproprietary unless otherwise noted. A superscript p indicates that a proprietary User Account has also been established. If you are not an ANL employee, a User Agreement signed by your home institution is a prerequisite for hands-on work at the APS. If your institution is not listed below (or if your institution is listed but a

180

Program Sustainability: Coordinating Energy Efficiency with Water...  

Broader source: Energy.gov (indexed) [DOE]

Program Sustainability: Coordinating Energy Efficiency with Water Conservation Services Peer Exchange Call Program Sustainability: Coordinating Energy Efficiency with Water...

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Panhandle Region Transportation Coordination Study  

E-Print Network [OSTI]

....................................................................................Panhandle Transit Needs Index Appendix B .............................................................................................................County Profiles Appendix C ......................................................Panhandle Transit: Operating... Statistics by County Appendix D................................................................................... Panhandle Agency Contact List Appendix E .......................................................... Panhandle Transportation Coordination...

Panhandle Regional Transportation Advisory Group

182

ORISE: Peer Review Workshop Coordination  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Workshop Coordination Group of men and women working together To facilitate discussion among members of the scientific community, the Oak Ridge Institute for Science and Education...

183

Optimization Online - Coordinate descent algorithms  

E-Print Network [OSTI]

Dec 1, 2014 ... Stephen Wright(swright ***at*** cs.wisc.edu). Abstract: Coordinate descent algorithms solve optimization problems by successively minimizing...

Stephen Wright

2014-12-01T23:59:59.000Z

184

Coordination of Energy Efficiency and Demand Response  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

044E 044E ERNEST ORLANDO LAWRENCE BERKELEY NATIONAL LABORATORY Coordination of Energy Efficiency and Demand Response Charles Goldman, Michael Reid, Roger Levy and Alison Silverstein Environmental Energy Technologies Division January 2010 The work described in this report was funded by the Department of Energy Office of Electricity Delivery and Energy Reliability, Permitting, Siting and Analysis of the U.S. Department of Energy under Contract No. DE-AC02- 05CH11231. Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor The Regents of the University of California, nor any of their employees, makes

185

100 Area electrical distribution fault and coordination report  

SciTech Connect (OSTI)

This report documents three-phase and line-to-ground fault values and time overcurrent coordination curves for the electrical utility distribution system located in the 100 Areas. Activities that may improve the coordination of the distribution system have also been identified. An evaluation of system coordination was performed. The results of this evaluation are listed in Appendix B. There are protective devices within the 100 Area distribution system that do not coordinate with one another throughout the Areas. There is also a mis-application of reclosing relays at the 100B Area. The impact of the mis-coordination and incorrect application of reclosing relays is that system selectivity is reduced. Equipment will still be protected against damaging currents, however more equipment will be de-energized than necessary during fault conditions. It is the opinion of the author of this report that the cases of mis-coordination listed above, and in Appendix B, do not significantly degrade the system protection system nor the reliability of the 100 Area distribution system. Therefore, immediate response to correct these problems is not recommended. However, a planned methodology, outlined in an Activity Plan, to correct these problems should be developed and implemented in the near future.

Webber, J.J. [ICF Kaiser Hanford Co., Richland, WA (United States)

1994-09-23T23:59:59.000Z

186

Gearbox Reliability Collaborative High-Speed Shaft Calibration  

SciTech Connect (OSTI)

Instrumentation has been added to the high-speed shaft, pinion, and tapered roller bearing pair of the Gearbox Reliability Collaborative gearbox to measure loads and temperatures. The new shaft bending moment and torque instrumentation was calibrated and the purpose of this document is to describe this calibration process and results, such that the raw shaft bending and torque signals can be converted to the proper engineering units and coordinate system reference for comparison to design loads and simulation model predictions.

Keller, J.; McNiff, B.

2014-09-01T23:59:59.000Z

187

CERTS 2012 Program Review - Reliability Standards Analysis and Assessment - Gil Tam, EPG  

Broader source: Energy.gov (indexed) [DOE]

12-13, 2012 12-13, 2012 Washington, DC FY12 DOE/CERTS Transmission Reliability R&D Internal Program Review Research Projects Reliability Standards Analysis and Assessments  Frequency Response Event Collection and Analysis  NERC Interconnections 2011 Annual Grid Reliability Performance Analysis and Report Page 1 Reliability Standards Analysis and Assessment  Objective: Support the NERC committees/groups (Resource Subcommittee and RS- Frequency Working Group) in the following ways: - Perform grid reliability metrics analysis using data collected in CERTS applications as requested by the RS - Analyze collected data to assess reliability performance at different levels - Interconnection, Reliability Coordinator, Balancing Authority - Perform analysis, testing, and monitoring of current and proposed

188

Financial Operations Coordinator Graduate School  

E-Print Network [OSTI]

with the Deans, Associate Deans, and Business officers in the colleges. Also coordinate awards; such as the Fulbright with the Provost's Office and International Programs. · Coordinate award programs, including Guest and manual entries for example: o Track purchasing transactions with appropriate documentation o P

Rutledge, Steven

189

Coordination of Energy Efficiency and Demand Response  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Coordination of Energy Efficiency and Demand Response Coordination of Energy Efficiency and Demand Response Title Coordination of Energy Efficiency and Demand Response Publication Type Report Refereed Designation Unknown Year of Publication 2010 Authors Goldman, Charles A., Michael Reid, Roger Levy, and Alison Silverstein Pagination 74 Date Published 01/2010 Publisher LBNL City Berkeley Keywords electricity markets and policy group, energy analysis and environmental impacts department Abstract This paper reviews the relationship between energy efficiency and demand response and discusses approaches and barriers to coordinating energy efficiency and demand response. The paper is intended to support the 10 implementation goals of the National Action Plan for Energy Efficiency's Vision to achieve all cost-effective energy efficiency by 2025.1 Improving energy efficiency in our homes, businesses, schools, governments, and industries-which consume more than 70 percent of the nation's natural gas and electricity-is one of the most constructive, cost-effective ways to address the challenges of high energy prices, energy security and independence, air pollution, and global climate change. While energy efficiency is an increasingly prominent component of efforts to supply affordable, reliable, secure, and clean electric power, demand response is becoming a valuable tool in utility and regional resource plans. The Federal Energy Regulatory Commission (FERC) estimated the contribution from existing U.S. demand response resources at about 41,000 megawatts (MW), about 5.8 percent of 2008 summer peak demand (FERC, 2008). Moreover, FERC recently estimated nationwide achievable demand response potential at 138,000 MW (14 percent of peak demand) by 2019 (FERC, 2009).2 A recent Electric Power Research Institute study estimates that "the combination of demand response and energy efficiency programs has the potential to reduce non-coincident summer peak demand by 157 GW" by 2030, or 14-20 percent below projected levels (EPRI, 2009a). This paper supports the Action Plan's effort to coordinate energy efficiency and demand response programs to maximize value to customers. For information on the full suite of policy and programmatic options for removing barriers to energy efficiency, see the Vision for 2025 and the various other Action Plan papers and guides available at www.epa.gov/eeactionplan.

190

SLAC Lightsource User Access Guidelines and Agreement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lightsource User Access Guidelines & Agreement Lightsource User Access Guidelines & Agreement August 3, 2011 SLAC-I-030-306-001-00-R002 1 SLAC Lightsource User Access Guidelines and Agreement LCLS / SSRL User Research Administration approval (signature/date): LCLS Safety Office approval (signature/date): SSRL Safety Office approval (signature/date): XFO Operations approval (signature/date): Revision Record Revision Date Revised Section(s) Affected Description of Change R001 October 4 th , 2010 User Form Updated SLAC Lightsource User Access Agreement Form R000 Sept 14, 2009 Original Release SLAC Lightsource User Access Guidelines & Agreement August 3, 2011 SLAC-I-030-306-001-00-R002 1 SLAC LIGHTSOURCE USER ACCESS GUIDELINES & AGREEMENT Introduction Welcome to SSRL and LCLS, SLAC's lightsource user facilities. We hope that your stay here will be

191

Unilateral (Out) Nondisclosure Agreement … Sample  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OUT) Non-Disclosure Agreement OUT) Non-Disclosure Agreement (Rev 07/09) Page 1 of 3 NON-DISCLOSURE AGREEMENT ("Agreement") This Agreement is entered into by and between the Alliance for Sustainable Energy, LLC ("Alliance"), the Manager and Operator of the National Renewable Energy Laboratory ("NREL") under Prime Contract No. DE- AC36-08GO28308 for the U.S. Department of Energy (the "DOE"), located at 1617 Cole Boulevard, Golden, Colorado, 80401 and [COMPANY NAME] ("Company"), whose place of business is located at [COMPANY ADDRESS ]. Both parties are hereinafter referred to individually as the "Party," and collectively as the "Parties". The effective date ("Effective Date") of this Agreement shall be the signature date of the last of the

192

NREL: Technology Transfer - Agreements for Commercializing Technology  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Agreements for Commercializing Technology Agreements for Commercializing Technology NREL uses Agreements for Commercializing Technology (ACT) when a partner seeks highly-specialized or technical services to complete a project. An ACT agreement also authorizes participating contractor-operated DOE laboratories, such as NREL, to partner with businesses using more flexible terms that are aligned with industry practice. The agreement type used depends on the business, and the specific partnership selected is determined on a case-by-case basis. Benefits The benefits of Agreements for Commercializing Technology include: Intellectual Property Rights. ACT provides a more flexible framework for negotiation of intellectual property rights to facilitate moving technology from the laboratory to the marketplace as quickly as possible.

193

Tribal Energy Resource Agreements | Open Energy Information  

Open Energy Info (EERE)

Tribal Energy Resource Agreements Tribal Energy Resource Agreements Jump to: navigation, search A Tribal Energy Resource Agreement (TERA) grants authority to a tribe to review and approve leases, business agreements, and rights-of-way for energy development on tribal lands. Title V of the Energy Policy Act of 2005 amends several sections of Title XXVI of the Energy Policy Act of 1992. Specifically, Sec. 2604 is amended to require that the U.S. Department of the Interior (DOI) establish a process by which a tribe can obtain a Tribal Energy Resource Agreement (TERA) granting authority to the tribe to review, approve, and manage leases, business agreements, and rights-of-way for energy development on tribal lands, without the approval of the Secretary of the Interior. In March 2008, the DOI issued its final

194

Reliable Power Inc | Open Energy Information  

Open Energy Info (EERE)

Power Inc Power Inc Jump to: navigation, search Name Reliable Power Inc Place Arlington, Virginia Zip VA 22201 Product US-based fuel cell manufacturer. Coordinates 43.337585°, -89.379449° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.337585,"lon":-89.379449,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

195

First Amendment to Programmatic Agreement for Colorado  

Broader source: Energy.gov [DOE]

First amendment to the programmatic agreement between DOE, the Colorado Governor's Energy Office, and the Colorado State Historic Preservation Office regarding EECBG, SEP and WAP undertakings.

196

Energy Department Awards Cooperative Agreement to Mississippi...  

Office of Environmental Management (EM)

today awarded a cooperative agreement to Mississippi State University, Institute for Clean Energy Technology (MSU-ICET), to continue research efforts in the evaluation of...

197

DOE Cooperative Research and Development Agreements  

Broader source: Energy.gov [DOE]

To establish Department of Energy (DOE) policy, requirements, and responsibilities for theoversight, management, and administration of Cooperative Research and DevelopmentAgreement (CRADA)...

198

International reservoir operations agreement helps NW fish &...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

or 503-230-5131 International reservoir operations agreement helps Northwest fish and power Portland, Ore. - The Bonneville Power Administration and the British Columbia...

199

EM International Agreements | Department of Energy  

Office of Environmental Management (EM)

EM International Agreements Memorandum of Understanding between the Department of Energy of the United States of America and the National Company of Radioactive Waste of Spain...

200

Haier: Compromise Agreement (2011-SE-1408)  

Broader source: Energy.gov [DOE]

DOE and Haier America Trading, L.L.C., entered into a Compromise Agreement to resolve a case involving the distribution in commerce of noncompliant freezers.

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Golden Opportunity: Compromise Agreement (2013-SE-1418)  

Broader source: Energy.gov [DOE]

DOE and Golden Opportunity, Inc. entered into a Compromise Agreement to resolve a case involving the distribution in commerce of noncompliant freezers.

202

Pax Global: Compromise Agreement (2013-SE-1413)  

Broader source: Energy.gov [DOE]

DOE and Pax Global, Inc., entered into a Compromise Agreement to resolve a case involving the distribution in commerce of noncompliant freezers.

203

Cooperative Agreement Awarded to Energy Communities Alliance...  

Broader source: Energy.gov (indexed) [DOE]

Energy Communities Alliance to Assist DOE Interface with Local Governments on Cleanup Missions Cooperative Agreement Awarded to Energy Communities Alliance to Assist DOE Interface...

204

Transmission Reliability | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

205

Nuclear weapon reliability evaluation methodology  

SciTech Connect (OSTI)

This document provides an overview of those activities that are normally performed by Sandia National Laboratories to provide nuclear weapon reliability evaluations for the Department of Energy. These reliability evaluations are first provided as a prediction of the attainable stockpile reliability of a proposed weapon design. Stockpile reliability assessments are provided for each weapon type as the weapon is fielded and are continuously updated throughout the weapon stockpile life. The reliability predictions and assessments depend heavily on data from both laboratory simulation and actual flight tests. An important part of the methodology are the opportunities for review that occur throughout the entire process that assure a consistent approach and appropriate use of the data for reliability evaluation purposes.

Wright, D.L. [Sandia National Labs., Albuquerque, NM (United States)

1993-06-01T23:59:59.000Z

206

CRAFTER LICENSE AGREEMENT This Agreement shall serve as a legal and binding Agreement by and between Texas  

E-Print Network [OSTI]

in the form prescribed by University ("Official Label") label to each Licensed Article. 6. ROYALTY PAYMENTS/REPORTS. (a) Royalty Payments. Upon execution of this Agreement, and upon renewal of this Agreement as set forth in Paragraph 3 above, Licensee shall pay to University a royalty fee in the amount of two hundred

207

Chapter Three - Pipeline Reliability Assessment  

Science Journals Connector (OSTI)

Abstract Another aspect of pipeline integrity management is the assessment of system reliability over the age of the pipeline. In order to assess the aging effects through the pipes lifetime, a reliability assessment is carried out for the pipeline or its segment. The assessment of the residual stress effect is carried out by evaluating the reliability of new uncorroded pipelines, which are assumed to be free from any flaw. The influence of residual stress parameters, mean, and coefficient of variation are considered in the reliability assessment.

Ramesh Singh

2014-01-01T23:59:59.000Z

208

Reliability Assessment of Distribution Systems.  

E-Print Network [OSTI]

?? A stable and reliable electric power supply system is an inevitable pre-requisite for the technological and economic growth of any nation. Due to this, (more)

Dorji, Tempa

2009-01-01T23:59:59.000Z

209

The design of a reliable reputation system  

E-Print Network [OSTI]

a peer reliability metric based on the distribution ofa higher reliability score. The most reliable distribution,distribution for the Sybil colluder and a sharp drop in its reliability

Swamynathan, Gayatri; Almeroth, Kevin C.; Zhao, Ben Y.

2010-01-01T23:59:59.000Z

210

2013 Reliability & Markets Peer Review - Day 1 Presentations | Department  

Broader source: Energy.gov (indexed) [DOE]

1 Presentations 1 Presentations 2013 Reliability & Markets Peer Review - Day 1 Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on August 6 - 7, 2013. Presentations from Day 1 (Sessions I through IV) are available below. Session I: Ben Hobbs (Johns Hopkins), Kameshwar Poolla (UC Berkeley) Session II: Ray Zimmerman (Cornell), Hsiao-Dong Chiang (Cornell) Session III: Shmuel Oren (UC Berkeley), Dan Tylavsky (U Arizona), Tom Overbye (U Illinois) Session IV: Lindsay Anderson (Cornell), HyungSeon Oh (Cornell) 2013 R&M Peer Review - Assessing Transmission Investments Under Uncertainty - Ben Hobbs, Johns Hopkins 2013 R&M Peer Review - Coordinated Aggregation of Distributed Energy Resources - Kameshwar Poolla, UC Berkeley

211

DOE Cooperative Research and Development Agreements Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Manual provides detailed requirements to supplement DOE O 483.1, DOE Cooperative Research and Development Agreements, dated 1-12-01, which establishes requirements for the performance of technology transfer through the use of Cooperative Research and Development Agreements (CRADAs). Canceled by DOE O 483.1A.

2001-01-12T23:59:59.000Z

212

North American Electric Reliability Corporation Interconnections...  

Broader source: Energy.gov (indexed) [DOE]

Interconnections North American Electric Reliability Corporation Interconnections Map of the North American Electric Reliability Corporation Interconnection showing the Eastern,...

213

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance...  

Broader source: Energy.gov (indexed) [DOE]

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report The following information...

214

Thermoelectric Mechanical Reliability | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Thermoelectric Mechanical Reliability Thermoelectric Mechanical Reliability 2010 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation Meeting,...

215

Thermoelectric Mechanical Reliability | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Thermoelectric Mechanical Reliability Thermoelectric Mechanical Reliability 2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation...

216

SRS Liquid Waste Program Partnering Agreement  

Broader source: Energy.gov [DOE]

We the members of the SRS Liquid Waste Partnering Team do hereby mutually agree to work in a collaborative and cooperative manner through open communication and coordination with team members, and...

217

SAMPLE MODEL AGREEMENT … NOT FOR EXECUTION  

Broader source: Energy.gov (indexed) [DOE]

MODEL AGREEMENT - NOT FOR EXECUTION MODEL AGREEMENT - NOT FOR EXECUTION 5/2/11 Template start-up option 1 of 8 OPTION AGREEMENT This option agreement (the "Agreement") is made by and is effective as of the date of last signature ("Effective Date") by Name of Contractor ("Abbreviated name of the Contractor" or "Lab"), which operates Name of National Laboratory at Address of the Lab (hereinafter "Abbreviated name of the Laboratory") under Contract No. ####### with the United States Department of Energy ("DOE") and Name of Company ("Abbreviated name of the Company" or "Company"), having a principal place of business at Address of the Company. 1. BACKGROUND 1.1. Lab owns certain U.S. patent properties related to describe the technology

218

CLASS DEVIATION FINDINGS AND DETERMINATION Trade Agreements  

Broader source: Energy.gov (indexed) [DOE]

Trade Agreements Trade Agreements FAR 25.402(b) Findings 1. On December 29,2009, the United States Trade Representative (USTR) established new procurement thresholds for the various Trade Agreements identified at FAR 25.402(b). The revised thresholds were effective on January 1,2010. 2. Civilian Agency Acquisition Letter 2010-01, issued on January 19,201 0, recommends that civilian agencies authorize issuance of a class deviation to use the new procurement thresholds for the Trade Agreements until such time as FAR 25.402(b) is formally amended. Determination It is hereby determined that a class deviation from FAR 25.402(b) is appropriate to allow the use of the revised procurement thresholds for the various Trade Agreements that were issued by the USTR on December 29,2009.

219

Danby Order & Compromise Agreement.pdf  

Broader source: Energy.gov (indexed) [DOE]

Danby Products, Inc., Danby Products, Inc., Respondent Issued: August 9, 2012 BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 ) ) ) ) ) ORDER Case Number: 2012-CE-1415 By the General Counsel, U.S. Department of Energy: I. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and Danby Products, Inc. ("Respondent"). The Compromise Agreement resolves the case initiated to pursue a civil penalty for violations of the compliance cetiification requirements located at I 0 C.F.R. § 429.12. 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that resolves this matter. A copy of the Compromise Agreement is attached hereto and incorporated by reference. 3. After reviewing the terms of the Compromise Agreement and evaluating the facts

220

MSGOUID MONTICELLO PROJECTS ·FEDERAL FACILITIES AGREEMENT REPORT  

Office of Legacy Management (LM)

MSGOUID MSGOUID MONTICELLO PROJECTS ·FEDERAL FACILITIES AGREEMENT REPORT Report Period: Aprill -June 30, 2006 DOE Project Coordinator: Art Kleinrath HIGHLIGHTS DOE submitted the draft Consolidated LTSM Administrative mid Operating Procedures Manual to EPA and UDEQ on May 4, 2006. Document transmittal met the stipulated penalty milestone of May 6, 2006. Semi-annual ground water and surface water monitoring was completed in May 2006 as scheduled. Three FY 2006 Program Directives were prepared and issued for bio-monitoring tasks to assess selenium accumulation in the environment and identify potential ecological receptors. All field work for FY 2006 bio-monitoring task was completed (five waterfowl surveys in May and June, sediment and surface water sample collection in April for selenium analysis,

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

2014 Reliability & Markets Peer Review  

Broader source: Energy.gov [DOE]

The Transmission Reliability R&D Reliability & Markets Peer Review included 15 presentations over 2 days on August 5 - 6, 2014 at Cornell University in Ithaca, NY. Presentations are available through the links. The agenda and list of presentations are available to download.

222

Lattice Boltzmann schemes without coordinates  

Science Journals Connector (OSTI)

...P. Boon and P. V. Coveney Lattice Boltzmann schemes without coordinates...developments extending the scope of the lattice Boltzmann method to unstructured (coordinateless...multi-scale applications. lattice Boltzmann method|irregular grids|computational...

2004-01-01T23:59:59.000Z

223

NREL: Gearbox Reliability Collaborative - About the Gearbox Reliability  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About the Gearbox Reliability Collaborative About the Gearbox Reliability Collaborative Premature gearbox failures have a significant impact on the cost of wind farm operations. In 2007, NREL initiated the Gearbox Reliability Collaborative (GRC). The project combines field testing, dynamometer testing, analysis, modeling, condition monitoring, development of a failure database, and operations and maintenance research in a multi-pronged approach to determine why wind turbine gearboxes do not always achieve their expected design life-the time period that manufacturers expect them to last. The collaborative of manufacturers, owners, operators, researchers, and consultants focuses on gearbox modeling and testing and the development of a gearbox failure database. Collaborative members also investigate gearbox

224

Energy Efficiency Loan Program Agreement-Template | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Agreement-Template Energy Efficiency Loan Program Agreement-Template A template agreement demonstrating how to address the deposit and use of the loan loss reserve monies. Author:...

225

Microsoft Word - NSRC precompetitive User Agreement amended 1...  

Broader source: Energy.gov (indexed) [DOE]

NSRC precompetitive User Agreement amended 1-18-07.doc Microsoft Word - NSRC precompetitive User Agreement amended 1-18-07.doc Microsoft Word - NSRC precompetitive User Agreement...

226

Federal Facility Agreement for the Laboratory for Energy-Related...  

Office of Environmental Management (EM)

Energy Related Health Research Agreement Name Federal Facility Agreement for the Laboratory for Energy- Related Health Research State California Agreement Type Federal Facility...

227

Clean Cities: Clean Cities Contacts for Coordinators  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contacts for Coordinators Contacts for Coordinators to someone by E-mail Share Clean Cities: Clean Cities Contacts for Coordinators on Facebook Tweet about Clean Cities: Clean Cities Contacts for Coordinators on Twitter Bookmark Clean Cities: Clean Cities Contacts for Coordinators on Google Bookmark Clean Cities: Clean Cities Contacts for Coordinators on Delicious Rank Clean Cities: Clean Cities Contacts for Coordinators on Digg Find More places to share Clean Cities: Clean Cities Contacts for Coordinators on AddThis.com... Coordinator Basics Outreach Education & Webinars Meetings Reporting Contacts Clean Cities Contacts for Coordinators The Clean Cities contact resources help coordinators communicate with the Clean Cities program staff and other coordinators. Program Contacts Use the program contacts to communicate individually with U.S. Department

228

Coordination Chemistry in the Solid State  

Science Journals Connector (OSTI)

...February 1996 research-article Coordination Chemistry in the Solid State Peter G. Bruce Salts...form a vital bridge between coordination chemistry in solution and more classical solid-state chemistry. The solid coordination compounds are...

1996-01-01T23:59:59.000Z

229

USDA and DOE to Coordinate Research of Plant and Microbial Genomics |  

Broader source: Energy.gov (indexed) [DOE]

to Coordinate Research of Plant and Microbial Genomics to Coordinate Research of Plant and Microbial Genomics USDA and DOE to Coordinate Research of Plant and Microbial Genomics January 17, 2006 - 10:39am Addthis -- Soybean DNA to be Decoded -- WASHINGTON - The U.S. Departments of Agriculture and Energy announced Monday they will share resources and coordinate the study of plant and microbial genomics, and the Department of Energy will tackle the sequencing of the soybean genome as the first project resulting from the agreement. "This agreement demonstrates a joint commitment to support high-quality genomics research and integrated projects to meet the nation's agriculture and energy challenges," said Dr. Colien Hefferan, administrator of USDA's Cooperative State Research, Extension and Economics Service (CSREES), who

230

NEVADA TEAM AGREEMENT BETWEEN WACKENHUT SERVICES, INCORPORATED  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NEVADA TEAM NEVADA TEAM AGREEMENT BETWEEN WACKENHUT SERVICES, INCORPORATED AND INDEPENDENT GUARD ASSOCIATION OF NEVADA LOCAL NO. 1 2009 - 2014 LAS VEGAS, NEVADA LAS VEGAS, NEVADA AGREEMENT BETWEEN WSI AND INDEPENDENT GUARD ASSOCIATION OF NEVADA LOCAL NO. 1 2009 - 2014 LAS VEGAS, NEVADA 1 AGREEMENT BETWEEN WSI AND INDEPENDENT GUARD ASSOCIATION OF NEVADA LOCAL NO. 1 2009 - 2014 LAS VEGAS, NEVADA 2 PREAMBLE This Agreement is entered into this first day of July 2009, by and between WSI, hereinafter referred to as the "Company" and the Independent Guard Association of Nevada, Local No. 1, hereinafter referred to as the "Union" as the sole and exclusive representative for the purposes of collective bargaining for the Company's employees employed at the locations described in

231

Tribal Programs, Special Initiatives, and Cooperative Agreements |  

Broader source: Energy.gov (indexed) [DOE]

Programs, Special Initiatives, and Cooperative Agreements Programs, Special Initiatives, and Cooperative Agreements Tribal Programs, Special Initiatives, and Cooperative Agreements EM is involved in the cleanup of nuclear waste at nationwide sites and facilities. The waste, a result of the production of nuclear weapons, has affected sovereign Tribal nations located near these facilities. These Tribal nations have been impacted by different types of waste contamination, and their participation in the EM mission is critical. Special Initiatives The Department and the Tribes have engaged in a wide range of issues under established cooperative agreements. The projects initiated by DOE and the Tribes are meeting the Department's two-fold mission of cleaning up America's environmental legacy and addressing environmental concerns for

232

Quick Guide: Power Purchase Agreements (Fact Sheet)  

SciTech Connect (OSTI)

Introduction to Federal power purchase agreements (PPAs), including available FEMP services and technical assistance as well as questions to ask when evaluating PPAs for a Federal renewable energy project.

Not Available

2010-06-01T23:59:59.000Z

233

ZERH Architect and Designer Partnership Agreement  

Broader source: Energy.gov [DOE]

What is expected of partners? Every type of partner has its own role. Review the partnership agreement package below for more information on partner expectations.Architect and designer partners may...

234

Quick Guide: Power Purchase Agreements (Fact Sheet)  

SciTech Connect (OSTI)

Introduction to Federal power purchase agreements (PPAs), including available FEMP services and technical assistance as well as questions to ask when evaluating PPAs for a Federal renewable energy project.

Not Available

2011-07-01T23:59:59.000Z

235

DOE Cooperative Research and Development Agreements  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes policy, requirements, and responsibilities for the oversight, management, and administration of Cooperative Research and Development Agreement (CRADA) activities at DOE facilities. Cancels DOE O 483.1 Admin Chg 1 and DOE M 483.1-1.

2013-11-06T23:59:59.000Z

236

Expectations for a New Climate Agreement  

E-Print Network [OSTI]

With the objective of stimulating timely and open discussion of the current attempt to formulate a new climate agreementto be reached at the 21st meeting of the Conference of Parties (COP-21) in Paris during November of ...

Jacoby, H.D.

237

The Complexity of Agreement Scott Aaronson #  

E-Print Network [OSTI]

The Complexity of Agreement Scott Aaronson # Abstract A celebrated 1976 theorem of Aumann asserts the computations needed for that conversation be performed e#ciently? This paper answers both questions in the a

Aaronson, Scott

238

The Complexity of Agreement # Scott Aaronson +  

E-Print Network [OSTI]

The Complexity of Agreement # Scott Aaronson + ABSTRACT A celebrated 1976 theorem of Aumann asserts his information and e#ort. Yet according to well­ known theory, such honest disagreement is im

Aaronson, Scott

239

Alabama State Historic Preservation Programmatic Agreement  

Broader source: Energy.gov [DOE]

Fully executed programmatic agreement between the U.S. Department of Energy, the Alabama Energy and Weatherization Offices and the Alabama State Historic Preservation Office regarding EECBG, SEP and WAP undertakings.

240

Argument licensing and agreement in Zulu  

E-Print Network [OSTI]

In this thesis, I examine some core grammatical phenomena - case licensing, agreement, the EPP - through the lens of the Bantu language Zulu. Zulu has a number of remarkable and puzzling properties whose analysis affords ...

Halpert, Claire

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

CLEERS Coordination & Joint Development of Benchmark Kinetics...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Kinetic Data CLEERS Coordination & Joint Development of Benchmark Kinetics for LNT & SCR CLEERS Coordination & Development of Catalyst Process Kinetic Data - Pres. 1:...

242

CLEERS Coordination & Joint Development of Benchmark Kinetics...  

Broader source: Energy.gov (indexed) [DOE]

CLEERS Coordination & Joint Development of Benchmark Kinetics for LNT & SCR CLEERS Coordination & Joint Development of Benchmark Kinetics for LNT & SCR 2012 DOE Hydrogen and Fuel...

243

Secretary Bodman Announces DOE Technology Transfer Coordinator...  

Broader source: Energy.gov (indexed) [DOE]

DOE Technology Transfer Coordinator Secretary Bodman Announces DOE Technology Transfer Coordinator June 29, 2007 - 2:36pm Addthis Establishes Policy Board; Strengthens DOE Efforts...

244

Coordination of Energy Efficiency and Demand Response  

E-Print Network [OSTI]

California Long-term Energy Efficiency Strategic Plan. B-2 Coordination of Energy Efficiency and Demand Response> B-4 Coordination of Energy Efficiency and Demand Response

Goldman, Charles

2010-01-01T23:59:59.000Z

245

CLEERS Coordination & Development of Catalyst Process Kinetic...  

Broader source: Energy.gov (indexed) [DOE]

Development of Catalyst Process Kinetic Data - Pres. 1: Coordination of CLEERS Project; Pres. 2: ORNL Research on LNT Sulfation & Desulfation CLEERS Coordination & Development of...

246

CLEERS Coordination & Development of Catalyst Process Kinetic...  

Broader source: Energy.gov (indexed) [DOE]

CLEERS Coordination & Development of Catalyst Process Kinetic Data CLEERS Coordination & Development of Catalyst Process Kinetic Data 2009 DOE Hydrogen Program and Vehicle...

247

Information Security: Coordination of Federal Cyber Security...  

Broader source: Energy.gov (indexed) [DOE]

Security: Coordination of Federal Cyber Security Research and Development Information Security: Coordination of Federal Cyber Security Research and Development GAO recommends that...

248

CLEERS Coordination & Development of Catalyst Process Kinetic...  

Broader source: Energy.gov (indexed) [DOE]

& coordinate DOE research efforts (CLEERS Coordination) * Develop detailed technical data required to simulate energy efficient emission controls (LNT & SCR Kinetics, Sulfur &...

249

Legal Agreements | BNL Guest, User and Visitor Center  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Legal Agreements Legal Agreements Adobe Acrobat Reader will be needed to view PDF files listed on this page. Obtain Reader or troubleshoot common problems. BNL User Agreements Non-Proprietary User Agreement Sample Non-Proprietary User Agreement (pdf) List of Institutions with Non-Proprietary User Agreement in place Open Data User Agreement Sample Open Data User Agreement (pdf) List of Institutions with Open Data User Agreement in place Proprietary User Agreement Sample Proprietary User Agreement (pdf) List of Institutions with Proprietary User Agreement in place Other Legal Agreements Guest Intellectual Property Agreement (GIPA) GIPA Sample (pdf) Cooperative Research and Development Agreements (CRADA) CRADA Information Work for Others (WFO) WFO Information Federal Agency Agreements

250

Clean Cities: National and Regional Coordinator Meetings  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

National and Regional Coordinator National and Regional Coordinator Meetings to someone by E-mail Share Clean Cities: National and Regional Coordinator Meetings on Facebook Tweet about Clean Cities: National and Regional Coordinator Meetings on Twitter Bookmark Clean Cities: National and Regional Coordinator Meetings on Google Bookmark Clean Cities: National and Regional Coordinator Meetings on Delicious Rank Clean Cities: National and Regional Coordinator Meetings on Digg Find More places to share Clean Cities: National and Regional Coordinator Meetings on AddThis.com... Coordinator Basics Outreach Education & Webinars Meetings Reporting Contacts National and Regional Coordinator Meetings Clean Cities hosts national and regional meetings for coordinators to share expertise, success stories, and lessons learned and to hear what's

251

Photovoltaics performance and reliability workshop  

SciTech Connect (OSTI)

This document consists of papers and viewgraphs compiled from the proceedings of a workshop held in September 1992. This workshop was the fifth in a series sponsored by NREL/DOE under the general subject areas of photovoltaic module testing and reliability. PV manufacturers, DOE laboratories, electric utilities and others exchanged technical knowledge and field experience. The topics of cell and module characterization, module and system performance, materials and module durability/reliability research, solar radiation, and applications are discussed.

Mrig, L. (ed.) [ed.

1992-01-01T23:59:59.000Z

252

Coordination of Energy Efficiency and Demand Response  

SciTech Connect (OSTI)

This paper reviews the relationship between energy efficiency and demand response and discusses approaches and barriers to coordinating energy efficiency and demand response. The paper is intended to support the 10 implementation goals of the National Action Plan for Energy Efficiency's Vision to achieve all cost-effective energy efficiency by 2025. Improving energy efficiency in our homes, businesses, schools, governments, and industries - which consume more than 70 percent of the nation's natural gas and electricity - is one of the most constructive, cost-effective ways to address the challenges of high energy prices, energy security and independence, air pollution, and global climate change. While energy efficiency is an increasingly prominent component of efforts to supply affordable, reliable, secure, and clean electric power, demand response is becoming a valuable tool in utility and regional resource plans. The Federal Energy Regulatory Commission (FERC) estimated the contribution from existing U.S. demand response resources at about 41,000 megawatts (MW), about 5.8 percent of 2008 summer peak demand (FERC, 2008). Moreover, FERC recently estimated nationwide achievable demand response potential at 138,000 MW (14 percent of peak demand) by 2019 (FERC, 2009).2 A recent Electric Power Research Institute study estimates that 'the combination of demand response and energy efficiency programs has the potential to reduce non-coincident summer peak demand by 157 GW' by 2030, or 14-20 percent below projected levels (EPRI, 2009a). This paper supports the Action Plan's effort to coordinate energy efficiency and demand response programs to maximize value to customers. For information on the full suite of policy and programmatic options for removing barriers to energy efficiency, see the Vision for 2025 and the various other Action Plan papers and guides available at www.epa.gov/eeactionplan.

Goldman, Charles; Reid, Michael; Levy, Roger; Silverstein, Alison

2010-01-29T23:59:59.000Z

253

Transportation External Coordination Working Group:  

Broader source: Energy.gov (indexed) [DOE]

External Coordination External Coordination Working Group: Background and Process Judith Holm National Transportation Program Albuquerque, New Mexico April 21, 2004 TEC History * DOE's Office of Environmental Management (EM) and Office of Civilian Radioactive Waste Management (OCRWM) formed TEC in 1992 * EM & RW developed MOU and TEC charter in 1992 - Other DOE program offices joined in 1993-94 * Other agencies (DOT, FRA, NRC, EPA) have been active participants Meeting Locations 1992-present Some Founding Principles * TEC concept centered on unique stakeholder accountability principles - Participation by key responsible parties in technical/policy issue discussion and resolution results in increased confidence and more efficient business decisions * Ultimate goal: develop multi-year set of

254

Reliability and Functional Availability of HVAC Systems  

E-Print Network [OSTI]

This paper presents a model to calculate the reliability and availability of heating, ventilation and air conditioning systems. The reliability is expressed in the terms of reliability, maintainability and decision capability. These terms are a...

Myrefelt, S.

2004-01-01T23:59:59.000Z

255

Constructing Reliable Distributed Communication Systems with CORBA  

E-Print Network [OSTI]

Constructing Reliable Distributed Communication Systems with CORBA Silvano Maffeis Douglas C Communication software and distributed services for next- generation applications must be reliable, efficient model to support reliable data- and process- oriented distributed systems that communicate through syn

Schmidt, Douglas C.

256

Clean Cities: Clean Cities Coordinator Basics  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Coordinator Basics to Coordinator Basics to someone by E-mail Share Clean Cities: Clean Cities Coordinator Basics on Facebook Tweet about Clean Cities: Clean Cities Coordinator Basics on Twitter Bookmark Clean Cities: Clean Cities Coordinator Basics on Google Bookmark Clean Cities: Clean Cities Coordinator Basics on Delicious Rank Clean Cities: Clean Cities Coordinator Basics on Digg Find More places to share Clean Cities: Clean Cities Coordinator Basics on AddThis.com... Coordinator Basics Clean Cities Program Structure Reference Materials Technical Support Fundraising Redesignation Outreach Education & Webinars Meetings Reporting Contacts Clean Cities Coordinator Basics Explore these resources for basic information to help you effectively support your Clean Cities coalition. Icon of an organization chart. Program Structure

257

GE_Order_and_Compromise_Agreement.pdf  

Broader source: Energy.gov (indexed) [DOE]

GE Appliances, a Division of GE Appliances, a Division of General Electric Company, Respondent ) ) ) ) ) ) ORDER By the General Counsel, U.S. Department of Energy: Case Number: 2012-SE-1403 1. In this Order, I adopt the attached Compromise Agreement entered into between the U.S. Department of Energy ("DOE") and GE Appliances, a Division of General Electric Company ("Respondent"). The Compromise Agreement resolves the case initiated after DOE was informed, based on test results made available as a result of verification testing by the Association of Home Appliance Manufacturers ("AHAM"), that aGE refrigerator basic model may not meet the energy conservation standard set forth in 10 C.F.R. § 430.32(a). 2. DOE and Respondent have negotiated the terms of the Compromise Agreement that

258

DOE/EEI Model Agreement Explanation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EEI Model Agreement Explanation EEI Model Agreement Explanation Introduction The attached document serves as a model for the development of formal agreements between a Federal civilian Agency and its serving Utility for the procurement of energy services on a "designated" or "sole" source basis. The Energy Policy Act of 1992 ("EPAct") establishes as a federal government goal, identifying and implementing all energy and water conservation projects with a payback of ten years or less. Executive Order 13123, signed on June 3, 1999, requires all federal agencies to achieve a 30% reduction in facilities energy use and a 20% improvement in industrial energy efficiency by the year 2005, relative to 1990 levels. The Order requires a 35% reduction in energy use at facilities and a 25% improvement in industrial energy

259

Enterprise-Wide Agreements | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Enterprise-Wide Enterprise-Wide Agreements Enterprise-Wide Agreements DOE's Office of the Chief Information Officer (OCIO) has designed the IT Acquisition: Enterprise-Wide Agreement (EWA) Program to develop and implement policies and procedures that support the identification, acquisition, oversight and compliance of enterprise licenses. EWAs are Department-wide acquisitions of widely used commercial software. The EWA Program has two core objectives to achieve the Program mission : Maximizing IT buying power and reducing total cost of ownership; Streamlining the IT total acquisition lifecycle. The EWA Program applies a centralized, cross-functional, strategic enterprise software solutions approach. The EWA Program leverages opportunities to create efficiencies and enhances the value of IT

260

DOE/EEI Model Agreement Explanation  

Broader source: Energy.gov (indexed) [DOE]

DOE/EEI Model Agreement Explanation DOE/EEI Model Agreement Explanation Introduction The attached document serves as a model for the development of formal agreements between a Federal civilian Agency and its serving Utility for the procurement of energy services on a "designated" or "sole" source basis. The Energy Policy Act of 1992 ("EPAct") establishes as a federal government goal, identifying and implementing all energy and water conservation projects with a payback of ten years or less. Executive Order 13123, signed on June 3, 1999, requires all federal agencies to achieve a 30% reduction in facilities energy use and a 20% improvement in industrial energy efficiency by the year 2005, relative to 1990 levels. The Order requires a 35% reduction in energy use at facilities and a 25% improvement in industrial energy

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Bilateral Agreements with China | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Bilateral Agreements with Bilateral Agreements with China Bilateral Agreements with China Members of China's Shenhua Group visit FE's National Energy Technology Laboratory. Photo courtesy of NETL. Members of China's Shenhua Group visit FE's National Energy Technology Laboratory. Photo courtesy of NETL. Fossil Energy Protocol between the United States and China The U.S.-China Fossil Energy Protocol is intended to promote scientific and technological cooperation between the United States and China in the field of fossil energy, particularly activities related to research, development, demonstration, and deployment. A complementary objective is to create opportunities for U.S. industry and power developers in China. The Protocol was originally signed in 2000 and was renewed in 2005 for an additional

262

Clock Agreement Among Parallel Supercomputer Nodes  

SciTech Connect (OSTI)

This dataset presents measurements that quantify the clock synchronization time-agreement characteristics among several high performance computers including the current world's most powerful machine for open science, the U.S. Department of Energy's Titan machine sited at Oak Ridge National Laboratory. These ultra-fast machines derive much of their computational capability from extreme node counts (over 18000 nodes in the case of the Titan machine). Time-agreement is commonly utilized by parallel programming applications and tools, distributed programming application and tools, and system software. Our time-agreement measurements detail the degree of time variance between nodes and how that variance changes over time. The dataset includes empirical measurements and the accompanying spreadsheets.

Jones, Terry R.; Koenig, Gregory A.

2014-04-30T23:59:59.000Z

263

Clock Agreement Among Parallel Supercomputer Nodes  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

This dataset presents measurements that quantify the clock synchronization time-agreement characteristics among several high performance computers including the current world's most powerful machine for open science, the U.S. Department of Energy's Titan machine sited at Oak Ridge National Laboratory. These ultra-fast machines derive much of their computational capability from extreme node counts (over 18000 nodes in the case of the Titan machine). Time-agreement is commonly utilized by parallel programming applications and tools, distributed programming application and tools, and system software. Our time-agreement measurements detail the degree of time variance between nodes and how that variance changes over time. The dataset includes empirical measurements and the accompanying spreadsheets.

Jones, Terry R.; Koenig, Gregory A.

264

Agreement Execution Process Study: CRADAs and NF-WFO Agreements and the Speed of Business  

SciTech Connect (OSTI)

This report summarizes the findings of a study on the execution of Cooperative Research and Development Agreements (CRADAs) and Non-Federal Work for Others (NF-WFO) agreements across the U.S. Department of Energy (DOE) laboratory complex. The study provides quantitiative estimates of times required to negotiate and execute these agreements across the DOE complex. It identifies factors impacting on cycle times and describes best practicies used at various laboratories and site offices that reduce cycle times.

Harrer, Bruce J.; Cejka, Cheryl L.; Macklin, Richard; Miksovic, Ann

2011-02-01T23:59:59.000Z

265

Smart Grid Investments Improve Grid Reliability, Resilience,...  

Energy Savers [EERE]

Investments Improve Grid Reliability, Resilience, and Storm Responses (November 2014) Smart Grid Investments Improve Grid Reliability, Resilience, and Storm Responses (November...

266

Electricity & Energy Reliability (WFP) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Electricity & Energy Reliability (WFP) Electricity & Energy Reliability (WFP) The purpose of the workforce Plan is to provide focus and direction to Human Resources (HR) strategy....

267

ELECTRICITY DELIVERY AND ENERGY RELIABILITY Appropriation Overview  

Broader source: Energy.gov (indexed) [DOE]

ELECTRICITY DELIVERY AND ENERGY RELIABILITY Appropriation Overview Electricity Delivery and Energy Reliability (OE) drives electric grid modernization and resiliency in the energy...

268

Thermoelectric Mechanical Reliability | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Mechanical Reliability Thermoelectric Mechanical Reliability 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation...

269

Coordinate Data and Stars Identification in Astrophysical Catalogs  

E-Print Network [OSTI]

The aim of our paper is to make high-precision positional stellar catalogs by compiling large astrophysical data bulk and large astrometrical surveys. The data reliability and uniqueness is the primary request. The common precision of 1 arc sec in coordinates is insufficient now to guarantee the simple identification of stars. Therefore the technique of catalogs verification become relevant. The paper presents the outcome of stars identification in The Henry Draper Extension Charts catalog and Variable stars catalog using proper method. Examples of conflicts permission concerning doubles and multiples stars in astrophysical catalogs are discussed.

Ashimbaeva, Nuriya T

2008-01-01T23:59:59.000Z

270

Coordinate Data and Stars Identification in Astrophysical Catalogs  

E-Print Network [OSTI]

The aim of our paper is to make high-precision positional stellar catalogs by compiling large astrophysical data bulk and large astrometrical surveys. The data reliability and uniqueness is the primary request. The common precision of 1 arc sec in coordinates is insufficient now to guarantee the simple identification of stars. Therefore the technique of catalogs verification become relevant. The paper presents the outcome of stars identification in The Henry Draper Extension Charts catalog and Variable stars catalog using proper method. Examples of conflicts permission concerning doubles and multiples stars in astrophysical catalogs are discussed.

Nuriya T. Ashimbaeva

2008-10-01T23:59:59.000Z

271

Electronic reliability estimation: how reliable are the results?  

Science Journals Connector (OSTI)

The development of Safety Critical Systems requires the compliance to several safety standards and regulations. Since, most of the times, human life is at stake, it is crucial to fully understand the behaviour of the system being developed in order to ... Keywords: MIL-Hdbk-217F, MTTF, estimation, reliability

Nuno Silva; Rui Lopes

2012-09-01T23:59:59.000Z

272

Work as coordination and coordination as work: A process perspective on FLOSS development projects  

E-Print Network [OSTI]

and coordination as work: A process perspective on FLOSS development projects Abstract Coordination in work teamsWork as coordination and coordination as work: A process perspective on FLOSS development projects Dipartimento Impresa e Lavoro Università degli Studi di Cassino Cassino Italy #12;Work as coordination

Crowston, Kevin

273

Modification No. M253 Supplemental Agreement to  

E-Print Network [OSTI]

Type Subject Brief Description Country: Argentina 61 407 8/1/1996 8/1/2001 Primary DOE None Energy.S. Department of Energy and Brookhaven Science Associates, LLC ATTACHMENT J.10 APPENDIX J TREATIES Contract No. DE-AC02-98CH10886 Modification No. M253 #12;United States Department of Energy Agreement

Johnson, Peter D.

274

Scalable Byzantine Agreement Clifford Scott Lewis  

E-Print Network [OSTI]

.g. I3 [23]) and distributed storage (e.g. FARSITE [1]). Distributed computation is an integral partScalable Byzantine Agreement Clifford Scott Lewis Jared Saia Abstract This paper gives a scalable) networks have emerged for a wide range of applications including data-sharing (e.g. Napster [32], Gnutella

Saia, Jared

275

COLLECTIVE AGREEMENT THE UNIVERSITY OF WINNIPEG  

E-Print Network [OSTI]

-New Year's Break 85 Proper Care of Research/Teaching Animals During a Strike or Lockout 87 Employment, lockouts, waste, avoidable expenses, and unnecessary delays. 1.2 While this Collective Agreement) The Employer shall not declare or cause a lockout of the Employees. ARTICLE 2 DEFINITION AND SCOPE 2.1 The term

Martin, Jeff

276

Interim Process Agreement Proposal June 3, 2003  

E-Print Network [OSTI]

Administration (BPA) Fish and Wildlife Memorandum of Agreement (MOA). This would include: 1) developing which specific projects will be capitalized by BPA, or will be available each year to be capitalized by BPA. This capital plan could be initially developed by Council, CBFWA, and BPA staffs based

277

Access Agreement Principal Contact for Enquiries  

E-Print Network [OSTI]

Access Agreement 2014/15 Contents 1) Introduction 3 2) Fees, Student Numbers and Fee Income 4 3, strong community spirit and excellent student life. Observing Keele's founding ethos of 'the pursuit of education for individuals, communities and society and equality of opportunity. 1.2 Our University Mission

Stell, John

278

International Environmental Agreements: Politics, Law and  

E-Print Network [OSTI]

in existence. We apply for the first time a ``lineage'' concept to differentiate between independent agreements College of Earth, Ocean and Atmospheric Sciences, Oregon State University, 104 CEOAS Administration ``traditional'' issues such as hydro- power, water allocation and irrigation are still important

Wolf, Aaron

279

Form EIA-411, "Coordinated Bulk Power Supply Program Report," | OpenEI  

Open Energy Info (EERE)

411, "Coordinated Bulk Power Supply Program Report," 411, "Coordinated Bulk Power Supply Program Report," Dataset Summary Description The Form EIA-411, "Coordinated Bulk Power Supply Program Report," collects information from the Nation's power system planners about the electricity supply, both capacity and energy, that is needed to serve current demand and for future growth. The reported data can be used to examine such issues as: the reliability of the U.S. electricity system; projections which assess future demand growth and plans for constructing new generating and transmission facilities; and consequences of unavailable or constrained capacity on usage of the existing generation base. Reliability of the electric power system covers three areas: the security of the electrical systems; the usage of

280

Henry Taube and Coordination Chemistry  

Office of Scientific and Technical Information (OSTI)

Henry Taube and Coordination Chemistry Henry Taube and Coordination Chemistry Resources with Additional Information Henry Taube Chuck Painter/Stanford News Service Henry Taube, a Marguerite Blake Wilbur Professor of Chemistry, Emeritus, at Stanford University, received the 1983 Nobel Prize in Chemistry "for his work on the mechanisms of electron transfer reactions, especially in metal complexes" Taube 'received a doctorate from the University of California-Berkeley in 1940 and was an instructor there from 1940-41. "I became deeply interested in chemistry soon after I came to Berkeley," Taube recalled. ... He joined the Cornell University faculty in 1941, becoming a naturalized United States citizen in 1942, and then moved in 1946 to the University of Chicago where he remained until 1961. A year later he joined the Stanford faculty as professor of chemistry, a position he held until 1986, when he became professor emeritus. ...

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Electricity Delivery and Energy Reliability  

Broader source: Energy.gov (indexed) [DOE]

The Office of Electricity Delivery and Energy Reliability (OE) drives electric grid modernization and resiliency in the energy infrastructure while working to enable innovation across the energy sector, empowering American consumers, and securing our energy future. The OE mission and the leadership role OE plays in the energy industry directly support the President's effort to accelerate the transformation of America's energy system

282

Producing reliable software: an experiment  

Science Journals Connector (OSTI)

A customer of high assurance software recently sponsored a software engineering experiment in which a small real-time software system was developed concurrently by two popular software development methodologies. One company specialized in the state-of-the-practice ... Keywords: capability maturity model, cleanroom certification, formal methods, software development methodologies, software engineering experiment, software process and product metrics, software reliability

Carol Smidts; Xin Huang; James C. Widmaier

2002-04-01T23:59:59.000Z

283

Panel Session III: Innovation and Coordination  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lessons Learned for Hydrogen Panel Session III: Innovation Panel Session III: Innovation and Coordination and Coordination ______________________________ Stefan Unnasch Life Cycle Associates 3 April 2008 2 Hydrogen Vision Life Cycle Associates 3 Hydrogen Infrastructure Today Life Cycle Associates Source: Weinert, J. X., et al.. (2005). CA Hydrogen Highway Network Blueprint Plan, Economics Report 4 Innovation and Coordination Life Cycle Associates Innovation Coordination ☯ Slow Fast Cars Codes 5 Innovation and Coordination Life Cycle Associates Innovation Coordination ☯ Slow Fast Cars Codes Fuel production and delivery technology Vehicle technology Marketing Policy Early introduction strategy GHG strategies

284

Distributed Sensor Coordination for Advanced Energy Systems  

SciTech Connect (OSTI)

The ability to collect key system level information is critical to the safe, efficient and reli- able operation of advanced energy systems. With recent advances in sensor development, it is now possible to push some level of decision making directly to computationally sophisticated sensors, rather than wait for data to arrive to a massive centralized location before a decision is made. This type of approach relies on networked sensors (called agents from here on) to actively collect and process data, and provide key control deci- sions to significantly improve both the quality/relevance of the collected data and the as- sociating decision making. The technological bottlenecks for such sensor networks stem from a lack of mathematics and algorithms to manage the systems, rather than difficulties associated with building and deploying them. Indeed, traditional sensor coordination strategies do not provide adequate solutions for this problem. Passive data collection methods (e.g., large sensor webs) can scale to large systems, but are generally not suited to highly dynamic environments, such as ad- vanced energy systems, where crucial decisions may need to be reached quickly and lo- cally. Approaches based on local decisions on the other hand cannot guarantee that each agent performing its task (maximize an agent objective) will lead to good network wide solution (maximize a network objective) without invoking cumbersome coordination rou- tines. There is currently a lack of algorithms that will enable self-organization and blend the efficiency of local decision making with the system level guarantees of global decision making, particularly when the systems operate in dynamic and stochastic environments. In this work we addressed this critical gap and provided a comprehensive solution to the problem of sensor coordination to ensure the safe, reliable, and robust operation of advanced energy systems. The differentiating aspect of the proposed work is in shift- ing the focus towards what to observe rather than how to observe in large sensor networks, allowing the agents to actively determine both the structure of the network and the relevance of the information they are seeking to collect. In addition to providing an implicit coordination mechanism, this approach allows the system to be reconfigured in response to changing needs (e.g., sudden external events requiring new responses) or changing sensor network characteristics (e.g., sudden changes to plant condition). Outcome Summary: All milestones associated with this project have been completed. In particular, private sensor objective functions were developed which are aligned with the global objective function, sensor effectiveness has been improved by using sensor teams, system efficiency has been improved by 30% using difference evaluation func- tions, we have demonstrated system reconfigurability for 20% changes in system con- ditions, we have demonstrated extreme scalability of our proposed algorithm, we have demonstrated that sensor networks can overcome disruptions of up to 20% in network conditions, and have demonstrated system reconfigurability to 20% changes in system conditions in hardware-based simulations. This final report summarizes how each of these milestones was achieved, and gives insight into future research possibilities past the work which has been completed. The following publications support these milestones [6, 8, 9, 10, 16, 18, 19].

Tumer, Kagan

2013-07-31T23:59:59.000Z

285

Reliability-based optimization using evolutionary algorithms  

Science Journals Connector (OSTI)

Uncertainties in design variables and problem parameters are often inevitable and must be considered in an optimization task if reliable optimal solutions are sought. Besides a number of sampling techniques, there exist several mathematical approximations ... Keywords: Ditlevsen's bound, Pareto-optimal front, evolutionary multiobjective optimization, most probable point, reliability-based optimization, reliable front, system reliability

Kalyanmoy Deb; Shubham Gupta; David Daum; Jrgen Branke; Abhishek Kumar Mall; Dhanesh Padmanabhan

2009-10-01T23:59:59.000Z

286

Implementing Agreement - U.S.-UK Collaboration in Fossil Energy...  

Broader source: Energy.gov (indexed) [DOE]

Implementing Agreement - U.S.-UK Collaboration in Fossil Energy R&D Implementing Agreement - U.S.-UK Collaboration in Fossil Energy R&D Implementing Agreement - U.S.-UK...

287

Reliability and Markets Program Information | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Reliability and Markets Program Information Reliability and Markets Program Information Summary of the Tranmission Reliability program's Reliability and Markets activity area. The...

288

File:Coordination.pdf | Open Energy Information  

Open Energy Info (EERE)

Coordination.pdf Jump to: navigation, search File File history File usage File:Coordination.pdf Size of this preview: 464 599 pixels. Other resolution: 464 600 pixels. Go to...

289

Agency Energy Coordinators for Award Nominations  

Broader source: Energy.gov [DOE]

Federal agency energy coordinators handle all nominations for the Federal Energy and Water Management Awards. Contact your agency energy coordinator well in advance of all award deadlines to learn...

290

Western Electricity Coordinating Council | Open Energy Information  

Open Energy Info (EERE)

Electricity Coordinating Council Place: Salt Lake City, UT References: SGIC1 This article is a stub. You can help OpenEI by expanding it. Western Electricity Coordinating Council...

291

Coordination of Transmission Line Transfer Capabilities  

E-Print Network [OSTI]

Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Summary The maximum power that can be transferred over any transmission line, called the transfer capacity

292

Advanced Petroleum Based Fuel Effects in HCCI (Agreement 13415...  

Broader source: Energy.gov (indexed) [DOE]

Advanced Petroleum Based Fuel Effects in HCCI (Agreement 13415) Advanced Petroleum Based Fuel Effects in HCCI (Agreement 13415) Presentation from the U.S. DOE Office of Vehicle...

293

Municipal Bond - Power Purchase Agreement Model Continues to...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Municipal Bond - Power Purchase Agreement Model Continues to Provide Low-Cost Solar Energy Municipal Bond - Power Purchase Agreement Model Continues to Provide Low-Cost Solar...

294

Boulder Valley School District (Colorado) Power Purchase Agreement...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Boulder Valley School District (Colorado) Power Purchase Agreement Case Study Boulder Valley School District (Colorado) Power Purchase Agreement Case Study Boulder Valley School...

295

Enhanced Ethanol Engine And Vehicle Efficiency (Agreement 13425...  

Broader source: Energy.gov (indexed) [DOE]

Enhanced Ethanol Engine And Vehicle Efficiency (Agreement 13425) Enhanced Ethanol Engine And Vehicle Efficiency (Agreement 13425) Presentation from the U.S. DOE Office of Vehicle...

296

The Cooperative Research and Development Agreement A Cooperative...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cooperative Research and Development Agreement A Cooperative Research and Development Agreement (CRADA) is a mechanism whereby non-federal entities (industry, universities,...

297

Microsoft Word - Short Form CRADA Agreement Boilerplate Approved...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

flexibility such agreements afford. STEVENSON-WYDLER (15 U.S.C. 3710a) SHORT FORM COOPERATIVE RESEARCH AND DEVELOPMENT AGREEMENT (hereinafter "CRADA") No. AL-C- - BETWEEN...

298

Durability of Diesel Engine Particulate Filters (Agreement ID...  

Broader source: Energy.gov (indexed) [DOE]

Durability of Diesel Engine Particulate Filters (Agreement ID:10461) Durability of Diesel Engine Particulate Filters (Agreement ID:10461) 2013 DOE Hydrogen and Fuel Cells Program...

299

United States, Russia Sign Agreement to Further Research and...  

Broader source: Energy.gov (indexed) [DOE]

United States, Russia Sign Agreement to Further Research and Development Collaboration in Nuclear Energy and Security United States, Russia Sign Agreement to Further Research and...

300

Subcontractor Rights Under CRADAs and WFO Agreements | Department...  

Broader source: Energy.gov (indexed) [DOE]

Subcontractor Rights Under CRADAs and WFO Agreements Subcontractor Rights Under CRADAs and WFO Agreements Juds Presentation.pdf More Documents & Publications ClassWaiverWC-2000-...

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Obama Administration and Great Lakes States Announce Agreement...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Great Lakes States Announce Agreement to Spur Development of Offshore Wind Projects Obama Administration and Great Lakes States Announce Agreement to Spur Development of...

302

New_Contractor_Information_for_Interconnection_Security_Agreement...  

Broader source: Energy.gov (indexed) [DOE]

NewContractorInformationforInterconnectionSecurityAgreement.pdf NewContractorInformationforInterconnectionSecurityAgreement.pdf NewContractorInformationforIntercon...

303

Request for Information: Federal Government Power Purchase Agreements...  

Broader source: Energy.gov (indexed) [DOE]

Request for Information: Federal Government Power Purchase Agreements (PPA) Issues Request for Information: Federal Government Power Purchase Agreements (PPA) Issues Document...

304

DOE Pens New Agreement with Southern Company to Test Advanced...  

Energy Savers [EERE]

Pens New Agreement with Southern Company to Test Advanced Carbon-Capture & Gasification Technologies DOE Pens New Agreement with Southern Company to Test Advanced Carbon-Capture &...

305

AHAM DOE Verification Test Agreement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

DOE Verification Test Agreement AHAM DOE Verification Test Agreement This letter is to inform AHAM that DOE is adopting a new policy regarding DOE ENERGY STAR verification testing...

306

Near quantitative agreement of model free DFT- MD predictions...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Near quantitative agreement of model free DFT- MD predictions with XAFS observations of the hydration structure of highly Near quantitative agreement of model free DFT- MD...

307

NOx Adsorber (Lean NOx Trap) Fundamentals (Agreement #10049 ...  

Broader source: Energy.gov (indexed) [DOE]

NOx Adsorber (Lean NOx Trap) Fundamentals (Agreement 10049 - PNNL Project 47120) NOx Adsorber (Lean NOx Trap) Fundamentals (Agreement 10049 - PNNL Project 47120) Presentation...

308

United States and South Africa Sign Agreement on Cooperation...  

Office of Environmental Management (EM)

South Africa Sign Agreement on Cooperation in Nuclear Energy Research and Development United States and South Africa Sign Agreement on Cooperation in Nuclear Energy Research and...

309

United States and Italy Sign Agreements to Advance Developments...  

Broader source: Energy.gov (indexed) [DOE]

Italy Sign Agreements to Advance Developments in Nuclear Energy United States and Italy Sign Agreements to Advance Developments in Nuclear Energy September 30, 2009 - 12:00am...

310

Nuclear safety information sharing agreement between NRC and...  

Office of Environmental Management (EM)

Nuclear safety information sharing agreement between NRC and DOE's Office of Environment, Health, Safety and Security Nuclear safety information sharing agreement between NRC and...

311

UDOT - Statewide Utility License Agreements | Open Energy Information  

Open Energy Info (EERE)

License Agreements Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: UDOT - Statewide Utility License Agreements Abstract This website links to UDOT...

312

Energy and Defense Departments Announce Agreement to Enhance...  

Office of Environmental Management (EM)

Agreement to Enhance Cooperation on Clean Energy and Strengthen Energy Security Energy and Defense Departments Announce Agreement to Enhance Cooperation on Clean Energy and...

313

U.S. Army Fort Carson Interconnection Agreement  

Broader source: Energy.gov [DOE]

Document describes a sample interconnection agreement for the U.S. Army Fort Carson photovoltaic (PV) project financed through a power purchase agreement (PPA).

314

Advance Funding and Development Agreement: Plains & Eastern Clean...  

Broader source: Energy.gov (indexed) [DOE]

Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean...

315

LAMPF reliability history and program  

Science Journals Connector (OSTI)

Many years of service of the 800?MeV LAMPF H+/H? linac offers the opportunity to evaluate the long?term reliability characteristics of a high?power machine which with up to 800?kW beam power available is as close to an ADTT machine as exists in the world today. Records from the last 15 years of operation were analyzed for trends and areas of deteriorating reliability or disproportionate downtime and used to support engineering judgment on facility refurbishment to regain beam availability. This round of analysis has helped define a further level of detail and automation to be implemented in availability recording. Interesting features which emerge from the history include a clear measurement of the lower availability in the first operating cycle following extended maintenance periods and a consistent picture of the highest availability to be expected in extended operating periods with the facility as used and maintained. The results provide a starting point for informed discussion of reliability goals.

Olin van Dyck

1995-01-01T23:59:59.000Z

316

Transportation External Coordination Working Group:  

Broader source: Energy.gov (indexed) [DOE]

Accomplishments and Future Accomplishments and Future Transportation External Coordination Working Group Meeting Phoenix, AZ Judith A. Holm, Office of National Transportation Office of Civilian Radioactive Waste Management April 4, 2005 TEC MEMBER ORGANIZATIONS American College of Emergency Physicians (ACEP) American Nuclear Society (ANS) Association of American Railroads (AAR) Brotherhood of Locomotive Engineers and Trainmen (BLET) Commercial Vehicle Safety Alliance (CVSA) Conference of Radiation Control Program Directors, Inc. (CRCPD) Council of Energy Resource Tribes (CERT) Council of State Governments-Eastern Regional Conference (CSG-ERC) Council of State Governments-Midwestern Office (CSG-MW) Council on Radionuclides and Radiopharmaceuticals (CORAR) Dangerous Goods Advisory Council (DGAC)

317

Safety and Security Enforcement Coordinator Handbook  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SAFETY AND SECURITY SAFETY AND SECURITY ENFORCEMENT COORDINATOR HANDBOOK August 2012 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy AUGUST 2012 DOE ENFORCEMENT COORDINATOR HANDBOOK TABLE OF CONTENTS i Table of Contents Ensure use of the proper version by checking with the Office of Enforcement and Oversight website at: www.hss.doe.gov/enforce/process_guidance.html. Acronyms and Definitions ........................................................................................... iii I. Purpose of Enforcement Coordinator Handbook ............................................ 1 II. Enforcement Coordinator Roles and Responsibilities ................................... 2 * DOE Enforcement Coordinator ......................................................................... 2

318

Safety and Security Enforcement Coordinator Handbook  

Broader source: Energy.gov (indexed) [DOE]

SAFETY AND SECURITY SAFETY AND SECURITY ENFORCEMENT COORDINATOR HANDBOOK August 2012 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy AUGUST 2012 DOE ENFORCEMENT COORDINATOR HANDBOOK TABLE OF CONTENTS i Table of Contents Ensure use of the proper version by checking with the Office of Enforcement and Oversight website at: www.hss.doe.gov/enforce/process_guidance.html. Acronyms and Definitions ........................................................................................... iii I. Purpose of Enforcement Coordinator Handbook ............................................ 1 II. Enforcement Coordinator Roles and Responsibilities ................................... 2 * DOE Enforcement Coordinator ......................................................................... 2

319

Reliability-Centered Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Reliability-Centered Maintenance Reliability-Centered Maintenance Reliability-Centered Maintenance October 7, 2013 - 9:48am Addthis Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance. The difference is that reliability-centered maintenance recognizes that: Equipment design and operations differ Different equipment has different probabilities of failure All equipment is not of equal importance to facility operations Facilities have limited financial and personnel resources. While reliability-centered maintenance relies on predictive maintenance practices and technologies, it also recognizes that maintenance on inexpensive and/or unimportant equipment may be better served by a reactive or predictive maintenance approach. Each of the aforementioned factors are

320

NREL: Wind Research - Gearbox Reliability Collaborative  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Research Search More Search Options Site Map Premature gearbox failures have a significant impact on the cost of wind farm operations. In 2007, NREL initiated the Gearbox Reliability Collaborative (GRC). The project combines analysis, field testing, dynamometer testing, condition monitoring, and the development and population of a gearbox failure database in a multi-pronged approach to determine why many wind turbine gearboxes do not achieve their expected design life-the time period that manufacturers expect them to last. Read about: The Gearbox Reliability Collaborative Gearbox Reliability Collaborative Projects Gearbox Reliability Collaborative Research and Development Working with the Gearbox Reliability Collaborative Gearbox Reliability Collaborative Publications

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Microgrids and Heterogeneous Security, Quality, Reliability, and Availability  

E-Print Network [OSTI]

and Energy Reliability, Distribution System Integrationand Energy Reliability, Distribution System Integration

Marnay, Chris

2007-01-01T23:59:59.000Z

322

Industrial risk management and international agreements  

Science Journals Connector (OSTI)

This paper presents a review of the management of industrial safety on the basis of international agreements and institutions. It is written from the viewpoint of the national or international regulator. Focus is given to major hazard risks related to the chemical process industry. Firstly, the key technical elements of the process to assess and manage industrial risks are described together with the related key legislative principles. Various techniques exist for the assessment of risk in industrial operations, and for the assessment of hazards to the environment and mankind. These techniques share common areas, e.g. with regard to data collection and interpretation, that offer the possibility of synergetic approaches via international agreements and institutions. In addition to technical risk assessment, cultural factors will need to be taken into account when addressing the topic of acceptable risk in any given social context. Secondly, various examples of current risk management frameworks in a multi- and bilateral context are given. Finally, as a concrete example of an industrial risk management framework, the European Union's legislation to control major accident hazards, the Seveso II Directive, is discussed. An outlook on future actions concludes the paper.

Christian Kirchsteiger

2003-01-01T23:59:59.000Z

323

MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT  

Office of Legacy Management (LM)

August/September 2005 August/September 2005 Report Period: July 1- September 30, 2005 DOE Project Coordinator: Art Kleinrath HIGHLIGHTS The draft-final Monticello Long-Term Surveillance and Afaintenance Operating Procedures for Swface and Ground Water (Volume III) and draft-final Annual Data Summmy Report for Operable Unit Ill of the Monticello Mill Tailings Site, October 2004 through April 2005 were completed. MRAP The annual inspection of the Monticello Mill Tailings Site and the Monticello Vicinity Properties was conducted on September 14 and 15. Several high priority repair items (see page 3 of this report) were identified during the inspection and were repaired by September 30, 2005. MVP No significant activities to report. FFA Monthly Report July- September 2005

324

MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT  

Office of Legacy Management (LM)

September/October 2004 September/October 2004 Report Period: September 1- October 31, 2004 DOE Project Coordinator: Art Kleinrath HIGHLIGHTS With the completion of all remedial action reports, installation of monitoring wells in accordance with the Remedial Design/Remedial Action Work Plan, and an onsite inspection by EPA and UDEQ, EPA was able tci write and sign the Preliminmy Closeout Report for the Monticello Mill Tailings Site (MMTS), Operable Units I, II, and III. With EPA's signature on this document (September 29, 2004), the MMTS was designated as "construction complete." MRAP The annual inspection oftheMMTS was conducted September 15-17,2004. With the exception of property now owned by the City of Monticello, the site is in good condition. Restoration and maintenance issues continue to exist on City owned property. DOE continues

325

MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT  

Office of Legacy Management (LM)

May/June 2004 May/June 2004 Report Period: May 1- June 30, 2004 DOE Project Coordinator: Art Kleinrath HIGHLIGHTS The Record of Decision for the Monticello Mill Tailings (USDOE) Site Operable Unit IlL Swface Water and Ground Water, Monticello, Utah, was signed by DOE, UDEQ, and EPA. The last signature was obtained on June 2, 2004, seven days before the scheduled completion date. Monitored Natnral Attenuation is the selected remedy. MRAP The water level in the Pond 4 Leak Detection System is monitored daily; the level is static and pumping is no longer necessary. MVP Approximately 40 cubic yards of bricks and mortar were removed by the owner from the Park Plaza Apartments (MS-00057) and placed near a city utility excavation. The bricks and mortar exceed the soil standard of 5 pCi/g Ra-226 above background and were

326

MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT  

Office of Legacy Management (LM)

January/February 2005 January/February 2005 Report Period: January 1 -February 28, 2005 DOE Project Coordinator: Art Kleinrath HIGHLIGHTS The Environmental Protection Agency (EPA), Utah Department of Environmental Quality (UDEQ), and U.S. Department ofEnergy (DOE) agreed that the Monticello Administrative Manual and Long-Term Surveillance and Maintenance Operating Procedures will not be combined into a single manual. Instead, the Monticello LTSM Operating Procedures for Swface and Ground Water will be written to address Operable Unit III requirements. A draft of this manual will be delivered to EPA and UDEQ by April14, 2005, and a draft-final version will be completed by August 12, 2005. A Program Directive for conducting wildlife surveys at the Monticello wetland areas has been

327

NREL-Brazil Bilateral Technical Coordination | Open Energy Information  

Open Energy Info (EERE)

Bilateral Technical Coordination Jump to: navigation, search Logo: NREL-Brazil Bilateral Technical Coordination Name NREL-Brazil Bilateral Technical Coordination AgencyCompany...

328

Modelling in industrial maintenance and reliability  

Science Journals Connector (OSTI)

......of modelling the reliability of wind turbines and some critical subsystems from...change, through the years, in wind turbines reliability. There were major...research on determining optimal maintenance policies for deteriorating systems......

Wenbin Wang

2010-10-01T23:59:59.000Z

329

Reliability analysis reloaded: how will we survive?  

Science Journals Connector (OSTI)

In safety related applications and in products with long lifetimes reliability is a must. Moreover, facing future technology nodes of integrated circuit device level reliability may decrease, i.e., counter-measures have to be taken to ensure product ...

Robert Aitken; Grschwin Fey; Zbigniew T. Kalbarczyk; Frank Reichenbach; Matteo Sonza Reorda

2013-03-01T23:59:59.000Z

330

LUNAR MASS SPECTROMETER RELIABILITY LOGIC DIAGRAM  

E-Print Network [OSTI]

point (A) to (F). The block diagram also defines the reliability functions for the purpose of FMEA 1

Rathbun, Julie A.

331

IEA Implementing Agreements | Open Energy Information  

Open Energy Info (EERE)

Implementing Agreements Implementing Agreements Jump to: navigation, search Name IEA Implementing Agreements Agency/Company /Organization International Energy Agency Sector Energy Focus Area Conventional Energy, Energy Efficiency, Renewable Energy Topics Implementation, Policies/deployment programs Website http://www.iea.org/techno/inde UN Region Central Asia, Eastern Asia, South-Eastern Asia, "Pacific" is not in the list of possible values (Eastern Africa, Middle Africa, Northern Africa, Southern Africa, Western Africa, Caribbean, Central America, South America, Northern America, Central Asia, Eastern Asia, Southern Asia, South-Eastern Asia, Western Asia, Eastern Europe, Northern Europe, Southern Europe, Western Europe, Australia and New Zealand, Melanesia, Micronesia, Polynesia, Latin America and the Caribbean) for this property., "Latin America and Caribbean" is not in the list of possible values (Eastern Africa, Middle Africa, Northern Africa, Southern Africa, Western Africa, Caribbean, Central America, South America, Northern America, Central Asia, Eastern Asia, Southern Asia, South-Eastern Asia, Western Asia, Eastern Europe, Northern Europe, Southern Europe, Western Europe, Australia and New Zealand, Melanesia, Micronesia, Polynesia, Latin America and the Caribbean) for this property., "Western Asia & North Africa" is not in the list of possible values (Eastern Africa, Middle Africa, Northern Africa, Southern Africa, Western Africa, Caribbean, Central America, South America, Northern America, Central Asia, Eastern Asia, Southern Asia, South-Eastern Asia, Western Asia, Eastern Europe, Northern Europe, Southern Europe, Western Europe, Australia and New Zealand, Melanesia, Micronesia, Polynesia, Latin America and the Caribbean) for this property., Northern America, "South Asia" is not in the list of possible values (Eastern Africa, Middle Africa, Northern Africa, Southern Africa, Western Africa, Caribbean, Central America, South America, Northern America, Central Asia, Eastern Asia, Southern Asia, South-Eastern Asia, Western Asia, Eastern Europe, Northern Europe, Southern Europe, Western Europe, Australia and New Zealand, Melanesia, Micronesia, Polynesia, Latin America and the Caribbean) for this property., "Sub-Saharan Africa" is not in the list of possible values (Eastern Africa, Middle Africa, Northern Africa, Southern Africa, Western Africa, Caribbean, Central America, South America, Northern America, Central Asia, Eastern Asia, Southern Asia, South-Eastern Asia, Western Asia, Eastern Europe, Northern Europe, Southern Europe, Western Europe, Australia and New Zealand, Melanesia, Micronesia, Polynesia, Latin America and the Caribbean) for this property., "Western & Eastern Europe" is not in the list of possible values (Eastern Africa, Middle Africa, Northern Africa, Southern Africa, Western Africa, Caribbean, Central America, South America, Northern America, Central Asia, Eastern Asia, Southern Asia, South-Eastern Asia, Western Asia, Eastern Europe, Northern Europe, Southern Europe, Western Europe, Australia and New Zealand, Melanesia, Micronesia, Polynesia, Latin America and the Caribbean) for this property.

332

Reliability Considerations from Integration of Smart Grid  

Broader source: Energy.gov (indexed) [DOE]

Considerations Considerations from the Integration of Smart Grid 116-390 Village Blvd., Princeton, NJ 08540 609.452.8060 | 609.452.9550 fax www.nerc.com the reliability of the to ensure bulk power system December 2010 (This page intentionally left blank) to ensure the reliability of the bulk power system Reliability Considerations of Integration of Smart Grid i

333

The Whereabouts of Reliability Education: Challenges & Opportunities  

E-Print Network [OSTI]

. There is a gap between reliability theory and practice, between school and industry, book knowledge and real The probability that the system is still operating at time t. where f(t) probability density function h(t) failure changing and getting higher. #12;Some Reliability books in ... 1960s Igor Bazovsky (1961), Reliability

Bernstein, Joseph B.

334

SAFETY AND RELIABILITY ANALYSIS OF NUCLEAR REACTORS  

Science Journals Connector (OSTI)

Abstract A survey of the various aspects of safety and reliability analysis of nuclear reactors is presented with particular emphasis on the interrelation between structural reliability and systems reliability. In reactor design this interrelation is of overriding importance since it is the task of the control, protective and containment systems to protect the mechanical system and the structure from accidental overloading.

T.A. JAEGER

1972-01-01T23:59:59.000Z

335

Bayesian Networks in Reliability Analysis Helge Langseth  

E-Print Network [OSTI]

Bayesian Networks in Reliability Analysis Helge Langseth Dept. Computer and Information Sciences Bayesian network (BN) models gain more and more popularity in reliability analysis. In this talk I reliability measures concerning a low pressure coolant injection system for a nuclear reactor (a problem

Langseth, Helge

336

RELIABILITY-BASED CASTING PROCESS DESIGN OPTIMIZATION  

E-Print Network [OSTI]

RELIABILITY-BASED CASTING PROCESS DESIGN OPTIMIZATION Richard Hardin1 , K.K. Choi1 , and Christoph 52242-1527 Keywords: Casting Process Design, Optimization, Reliability-Based Design Optimization purpose reliability-based design optimization (RBDO) software tool previously developed at the University

Beckermann, Christoph

337

Measuring Improved Reliability in Stochastic Systems  

E-Print Network [OSTI]

for such a path, this represents a better measure of the path's reliability. If the distribution were asymmetricMeasuring Improved Reliability in Stochastic Systems Jeremy Bradley \\Lambda Neil Davies y 30 June 1999 Abstract In this paper, we examine reliability of stochastic systems with specific application

Bradley, Jeremy

338

Co-Tenancy Agreement This agreement was reached on _________________________________, 20_______ between  

E-Print Network [OSTI]

. a copy of all written agreements with the landlord is attached. A security or damage deposit totaling in relation to renting the dwelling: check off all that apply: a.___utilities (electricity, gas, fuel oil by the landlord. 6. Security or Damage Deposit: The co-tenants agree that their claim to the security deposit

Suzuki, Masatsugu

339

Software reliability models for critical applications  

SciTech Connect (OSTI)

This report presents the results of the first phase of the ongoing EG&G Idaho, Inc. Software Reliability Research Program. The program is studying the existing software reliability models and proposes a state-of-the-art software reliability model that is relevant to the nuclear reactor control environment. This report consists of three parts: (1) summaries of the literature review of existing software reliability and fault tolerant software reliability models and their related issues, (2) proposed technique for software reliability enhancement, and (3) general discussion and future research. The development of this proposed state-of-the-art software reliability model will be performed in the second place. 407 refs., 4 figs., 2 tabs.

Pham, H.; Pham, M.

1991-12-01T23:59:59.000Z

340

Software reliability models for critical applications  

SciTech Connect (OSTI)

This report presents the results of the first phase of the ongoing EG G Idaho, Inc. Software Reliability Research Program. The program is studying the existing software reliability models and proposes a state-of-the-art software reliability model that is relevant to the nuclear reactor control environment. This report consists of three parts: (1) summaries of the literature review of existing software reliability and fault tolerant software reliability models and their related issues, (2) proposed technique for software reliability enhancement, and (3) general discussion and future research. The development of this proposed state-of-the-art software reliability model will be performed in the second place. 407 refs., 4 figs., 2 tabs.

Pham, H.; Pham, M.

1991-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

CLEERS Coordination & Joint Development of Benchmark Kinetics...  

Broader source: Energy.gov (indexed) [DOE]

Joint Development of Benchmark Kinetics for LNT & SCR CLEERS Coordination & Joint Development of Benchmark Kinetics for LNT & SCR 2011 DOE Hydrogen and Fuel Cells Program, and...

342

Memorandum of Understanding Regarding Coordination in Federal...  

Office of Environmental Management (EM)

Memorandum of Understanding Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, 2009 Memorandum of Understanding...

343

Athletic Training Coordinator Hometown: Colorado Springs, CO  

E-Print Network [OSTI]

WHO WE ARE Gaby Bell Athletic Training Coordinator Hometown: Colorado Springs, CO Certifications Athletic Training Graduate Assistant Jonathan Hodapp Student Athletic Trainer Mike Carlson Student Athletic

Van Stryland, Eric

344

Coordination of Energy Efficiency and Demand Response  

E-Print Network [OSTI]

of Energy demand-side management energy information systemdemand response. Demand-side management (DSM) program goalsa goal for demand-side management (DSM) coordination and

Goldman, Charles

2010-01-01T23:59:59.000Z

345

A Metal-Ion Coordinated Hybrid Multilayer  

Science Journals Connector (OSTI)

A Metal-Ion Coordinated Hybrid Multilayer ... Support of this work by the Israel Science Foundation and the Israel Ministry of Science (Tashtiot Infrastructure Program), is gratefully acknowledged. ...

Anat Hatzor; Tamar van der Boom-Moav; Shira Yochelis; Alexander Vaskevich; Abraham Shanzer; Israel Rubinstein

2000-04-21T23:59:59.000Z

346

Energy Agency Coordinators for Energy Action Month  

Broader source: Energy.gov [DOE]

Agency coordinators serve as primary Federal agency points of contact for Energy Action Month. Contact them if you have questions about implementing an Energy Action Month campaign.

347

Optimization Online - An Accelerated Proximal Coordinate Gradient ...  

E-Print Network [OSTI]

Jul 7, 2014 ... An Accelerated Proximal Coordinate Gradient Method and its Application to Regularized Empirical Risk Minimization. Qihang Lin(qihang-lin...

Qihang Lin

2014-07-07T23:59:59.000Z

348

Coordination Chemistry in magnesium battery electrolytes: how...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Chemistry in magnesium battery electrolytes: how ligands affect their performance. Coordination Chemistry in magnesium battery electrolytes: how ligands affect their performance....

349

Coordination of Energy Efficiency and Demand Response  

E-Print Network [OSTI]

District Small Business Summer Solutions: Energy and DemandSummer Solutions: Energy and Demand Impacts Monthly Energy> B-2 Coordination of Energy Efficiency and Demand Response

Goldman, Charles

2010-01-01T23:59:59.000Z

350

IEEE TRANSACTIONS ON RELIABILITY, VOL. 38, NO. 1,1989 APRIL 103 Reliable Protocols for Distributed  

E-Print Network [OSTI]

IEEE TRANSACTIONS ON RELIABILITY, VOL. 38, NO. 1,1989 APRIL 103 Reliable Protocols for Distributed-tolerance, Message complexity, Reliable protocol Reader Aids - Purpose: Design reliable distributed protocols Special Termination Detection S. Venkatesan University of Pittsburgh, Pittsburgh Key Words - Distributed system, Fault

Venkatesan, S.

351

PAID INTERNSHIP -Junior Marketing & Social Media Coordinator JACOB is offering up a paid internship as Junior Marketing & Social Media Coordinator.  

E-Print Network [OSTI]

PAID INTERNSHIP - Junior Marketing & Social Media Coordinator JACOB is offering up a paid internship as Junior Marketing & Social Media Coordinator. The Junior Marketing & Social Media Coordinator will actively participate in the implementation of our company's overall marketing efforts by coordinating

352

Decentralized coordination through digital technology, dynamic pricing, and Customer-Driven control: the GridWise testbed demonstration project  

SciTech Connect (OSTI)

The project highlights the idea that technology-enabled decentralized coordination can achieve the same, or better, economic and reliability benefits when compared to utility-focused centralized physical and economic control. Among the design's unique features was a retail double auction with five-minute market-clearing intervals that included residential customers as direct, active market participants. (author)

Chassin, David P.; Kiesling, Lynne

2008-10-15T23:59:59.000Z

353

Non-Petroleum Based Fuel Effects on Advanced Combustion (Agreement...  

Broader source: Energy.gov (indexed) [DOE]

Non-Petroleum Based Fuel Effects on Advanced Combustion (Agreement 13425) Non-Petroleum Based Fuel Effects on Advanced Combustion (Agreement 13425) Presentation from the U.S. DOE...

354

Agreements and Disagreements in a Computer-Mediated Discussion  

E-Print Network [OSTI]

Agreements and disagreements in a predominantly female computer-mediated discussion group which discusses soap operas are analyzed in terms of their message features. The findings differ from those on agreements and disagreements in oral interaction...

Baym, Nancy K.

1996-01-01T23:59:59.000Z

355

Federal Facility Agreement (FFA) Signed at Oak Ridge | Department...  

Office of Environmental Management (EM)

Federal Facility Agreement (FFA) Signed at Oak Ridge Federal Facility Agreement (FFA) Signed at Oak Ridge The Oak Ridge Reservation FFA was implemented on January 1, 1992. It is a...

356

[Rev. 03/14/06] UNLV ROYALTY SHARING AGREEMENT  

E-Print Network [OSTI]

[Rev. 03/14/06] UNLV ROYALTY SHARING AGREEMENT The undersigned agree to the percentage distribution of net income royalties from patents or sales of the copyrighted works as identified in this agreement

Hemmers, Oliver

357

Third-Party Financing and Power Purchase Agreements for Public...  

Broader source: Energy.gov (indexed) [DOE]

presentation of power purchase agreements, specifically as they relate to public sector solar photovoltaic projects. Author: National Renewable Energy Laboratory...

358

Abstract--This paper reports on work the Consortium for Electric Reliability Technology Solutions (CERTS) has been  

E-Print Network [OSTI]

Abstract-- This paper reports on work the Consortium for Electric Reliability Technology Solutions markets is: How The work described in this paper was coordinated by the Consortium for Electric. The work was funded by the Assistant Secretary of Energy Efficiency and Renewable Energy, Office of Power

359

2014 DOE Human Reliability Program (HRP) Workshop | Department...  

Office of Environmental Management (EM)

DOE Human Reliability Program (HRP) Workshop 2014 DOE Human Reliability Program (HRP) Workshop August 18, 2014 - 7:51am Addthis 2014 DOE Human Reliability Program (HRP) Workshop...

360

Electricity Delivery and Energy Reliability | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Electricity Delivery and Energy Reliability Electricity Delivery and Energy Reliability information about the delivery of electricity and energy reliability Electricity Delivery...

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

NANOSCIENCE @ UNIVERSITY OF NEW MEXICO FACILITIES USE AGREEMENT  

E-Print Network [OSTI]

NANOSCIENCE @ UNIVERSITY OF NEW MEXICO FACILITIES USE AGREEMENT This Facilities Use Agreement Service Center program sponsored by Nanoscience @ UNM. This Agreement establishes the terms and conditions under which User and/or User's employees and agents shall use the Nanoscience @ UNM laboratory

New Mexico, University of

362

Safeguards Agreement and Protocol with the International Atomic Energy Agency  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To ensure that DOE complies with the Agreement Between the United States of America and the International Atomic Energy Agency for the Application of Safeguards in the United States, the Protocol to the Agreement, and the subsidiary arrangements to the Agreement. Canceled by DOE O 142.2A. Cancels DOE 1270.2B.

2004-01-07T23:59:59.000Z

363

Differential evolution applied for reliability optimization of radial distribution systems  

Science Journals Connector (OSTI)

This paper describes a methodology for reliability enhancement of radial distribution system by determining optimal values of repair times and failure rates of each section. Penalty cost functions have been constructed as function of failure rates and repair times. Constraints on customer and energy based indices, i.e. SAIFI, SAIDI, CAIDI and AENS have been considered. The problem has been decomposed in two stages. One stage determines the optimum failure rates and second stage optimizes repair times satisfying constraints. A population based approach, i.e. differential evolution (DE) has been used as optimization technique. The algorithm has been implemented on a sample test system. Results obtained have been compared with those obtained using particle swarm optimization (PSO) and co-ordinated aggregation based particle swarm optimization techniques (CAPSO).

L.D. Arya; S.C. Choube; Rajesh Arya

2011-01-01T23:59:59.000Z

364

Coordinate systems in De Sitter spacetime  

E-Print Network [OSTI]

Coordinate systems in De Sitter spacetime Bachelor thesis A.C. Ripken July 19, 2013 Radboud systems in De Sitter space. #12;Contact Name Chris Ripken Email a.c.ripken@student.ru.nl Student number are studied. The Klein-Gordon equation is generalized for curved spacetime, and solved in various coordinate

van Suijlekom, Walter

365

Coordinating DOE Technical Standards, TSPP-5  

Broader source: Energy.gov (indexed) [DOE]

DOE-TSPP-5-2013 September 2013 COORDINATING DOE TECHNICAL STANDARDS U.S. Department of Energy Office of Nuclear Safety Washington, D.C. 20585 DOE-TSPP-5-2013 Coordinating September 2013 DOE Technical Standards Program i CONTENTS 1. SCOPE ............................................................................................................................................ 1 1.1 Purpose ....................................................................................................................... 1 1.2 Applicability ................................................................................................................. 1 2. GENERAL ....................................................................................................................................... 1

366

Montana Watershed Coordination Council | Open Energy Information  

Open Energy Info (EERE)

Watershed Coordination Council Watershed Coordination Council Jump to: navigation, search Logo: Montana Watershed Coordination Council Name Montana Watershed Coordination Council Place Helena, Montana Zip 59604-6873 Website http://mtwatersheds.org/index. References MWCC Website[1] This article is a stub. You can help OpenEI by expanding it. Montana Watershed Coordination Council is an organization based in Helena, Montana. MWCC has been cultivating broad-based support for community driven approaches to managing complex land and water issues for over eighteen years as the statewide organization representing each of more than 60 watershed groups. The MWCC mission is to enhance, conserve, and protect natural resources and sustain the high quality of life in Montana for present and future

367

Coordination of Federal Authorizations for Electric Transmission  

Broader source: Energy.gov (indexed) [DOE]

Coordination of Federal Authorizations for Electric Transmission Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule The utility operating companies of the American Electric Power System1 ("AEP") commend the Department of Energy ("DOE") for its ongoing commitment to implement the provisions of the Energy Policy Act of 2005 ("EPAct"), specifically, as addressed here, the DOE's continuing effort to establish procedures under which entities may request that DOE coordinate Federal authorizations for the siting of interstate transmission facilities. Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule

368

Mr. Carl Spreng RFLMA Project Coordinator HMWMD-B2  

Office of Legacy Management (LM)

Spreng Spreng RFLMA Project Coordinator HMWMD-B2 Department of Energy Washington , DC 20585 September 9, 2013 Colorado Department of Public Health and Environment 4300 Cherry Creek Drive South Denver, CO 80246-1530 Subject: Notification that GS01 is no longer an RFLMA Point of Compliance (POC) Reference: Rocky Flats Legacy Management Agreement (RFLMA) Attachment 2, Section 5.1, "Monitoring Requirements" Dear Mr. Spreng: In accordance with the criteria provided in Section 5.1 of RFLMA Attachment 2, this is to certify that surface water monitoring location WOMPOC has been functioning as an RFLMA POC for 2 years and now replaces surface water monitoring location GS01 as the POC. This notification completes the process to remove the RFLMA Attachment 2 requirement for monitoring at GSO 1.

369

Generation IV International Forum Signs Agreement to Collaborate...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Japan Increase Cooperation on Sodium-Cooled Fast Reactor Prototypes China and Russia to Join the Generation IV International Forum Renewed energy and enhanced coordination...

370

Confidentiality Agreement between the Nuclear Decommissioning Authority and  

Broader source: Energy.gov (indexed) [DOE]

Services » Communication & Engagement » International Programs » Services » Communication & Engagement » International Programs » Confidentiality Agreement between the Nuclear Decommissioning Authority and US Department of Energy Confidentiality Agreement between the Nuclear Decommissioning Authority and US Department of Energy Confidentiality Agreement between the Nuclear Decommissioning Authority in UK and US Department of Energy Confidentiality Agreement between the Nuclear Decommissioning Authority and US Department of Energy More Documents & Publications Statement of Intent between the US Department of Energy and UK Nuclear Decommissioning Authority Scanned_Agreement.pdf Statement of Intent NO. 2 between the US Department of Energy and UK Nuclear Decommissioning Authority Waste Management Nuclear Materials & Waste

371

GreenIT Service Level Agreements IN SERVICE LEVEL AGREEMENTS IN GRIDS WORKSHOP COLOCATED WITH IEEE/ACM GRID  

E-Print Network [OSTI]

GreenIT Service Level Agreements IN SERVICE LEVEL AGREEMENTS IN GRIDS WORKSHOP COLOCATED WITH IEEE towards the inclusion of Green IT metrics as part of service level agreements for future Grids and Clouds. As part of this effort we need to revisit Green IT metrics and proxies that we consider optimizing against

372

Reliability Technology earns prestigious Los Alamos Award  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

September 2013 Reliability Technology earns prestigious Los Alamos Award Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest...

373

Funding Opportunity Announcement: PHYSICS OF RELIABILITY: EVALUATING...  

Office of Environmental Management (EM)

and development projects that will advance the reliability and durability of solar photovoltaic (PV) technologies. Eligible projects will examine the performance of PV modules and...

374

Substation reliability -- Practical application and system approach  

SciTech Connect (OSTI)

Practical application of reliability analysis was made for the comparison of alternate line and bus arrangements of a future transmission substation with potential savings of up to $3.6 M. The paper describes how both the substation and the power system were simulated by using computer programs STAREL and COMREL. It presents the method used to obtain the most accurate estimates for the outage data of the system components. Finally, it expresses the results with simple reliability indices which can be meaningful for management. The results of the study show the need to include the reliability of the transmission system in a substation reliability evaluation.

Save, P. [Southern California Edison Co., Rosemead, CA (United States)] [Southern California Edison Co., Rosemead, CA (United States)

1995-02-01T23:59:59.000Z

375

Substation reliability -- Practical application and system approach  

SciTech Connect (OSTI)

Practical application of reliability analysis was made for the comparison of alternate line and bus arrangements of a future transmission substation with potential savings of up to 53.6 M. The paper describes how both the substation and the power system were simulated by using computer programs STAREL and COMREL. It presents the method used to obtain the most accurate estimates for the outage data of the system components. Finally, it expresses the results with simple reliability indices which can be meaningful for management. The results of the study show the need to include the reliability of the transmission system in a substation reliability evaluation.

Save, P. [Southern California Edison Co., Rosemead, CA (United States)

1994-12-31T23:59:59.000Z

376

Information Concerning Reliability Impacts under Various System...  

Broader source: Energy.gov (indexed) [DOE]

Impacts under Various System Configurations of the Mirant Potomac River Plant Information Concerning Reliability Impacts under Various System Configurations of the Mirant...

377

Sandia National Laboratories: Third Annual Continuous Reliability...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

analysis of U.S. wind fleet performance based on aggregated fleet reliability data and includes operational statistics, availability time accounting, and top contributors...

378

Reliability evaluation of smart distribution grids.  

E-Print Network [OSTI]

??The term "Smart Grid" generally refers to a power grid equipped with the advanced technologies dedicated for purposes such as reliability improvement, ease of control (more)

Kazemi, Shahram

2011-01-01T23:59:59.000Z

379

Technical Exchange and Cooperation Agreement between the Department of  

Broader source: Energy.gov (indexed) [DOE]

Technical Exchange and Cooperation Agreement between the Department Technical Exchange and Cooperation Agreement between the Department of Energy and the European Atomic Energy Community Technical Exchange and Cooperation Agreement between the Department of Energy and the European Atomic Energy Community The objective of this technical arrangement is to establish a framework for co-operation between the Parties in the field of nuclear-related technology research and development based upon mutual benefit. The co-operation is intended to occur in specific areas where the programs of the Parties complement one another as well as those in which comparability exists. 4.5.1.1.3.3_eu_agreement.pdf More Documents & Publications International_Agreements_January_2001_December_2004.pdf International Agreements Comments Scanned_Agreement.pdf

380

Minnesota Environmental Coordination Procedures Act (Minnesota) |  

Broader source: Energy.gov (indexed) [DOE]

Minnesota Environmental Coordination Procedures Act (Minnesota) Minnesota Environmental Coordination Procedures Act (Minnesota) Minnesota Environmental Coordination Procedures Act (Minnesota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Minnesota Program Type Siting and Permitting This Act is designed to streamline the review procedures for a given

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Software Reliability Cases: The Bridge Between Hardware, Software and System Safety and Reliability  

SciTech Connect (OSTI)

High integrity/high consequence systems must be safe and reliable; hence it is only logical that both software safety and software reliability cases should be developed. Risk assessments in safety cases evaluate the severity of the consequences of a hazard and the likelihood of it occurring. The likelihood is directly related to system and software reliability predictions. Software reliability cases, as promoted by SAE JA 1002 and 1003, provide a practical approach to bridge the gap between hardware reliability, software reliability, and system safety and reliability by using a common methodology and information structure. They also facilitate early insight into whether or not a project is on track for meeting stated safety and reliability goals, while facilitating an informed assessment by regulatory and/or contractual authorities.

Herrmann, D.S.; Peercy, D.E.

1999-01-08T23:59:59.000Z

382

Demand Response and Electric Grid Reliability  

E-Print Network [OSTI]

Demand Response and Electric Grid Reliability Paul Wattles Senior Analyst, Market Design & Development, ERCOT CATEE Conference, Galveston October 10, 2012 2 North American Bulk Power Grids CATEE Conference October 10, 2012 ? The ERCOT... adequacy ? ?Achieving more DR participation would . . . displace some generation investments, but would achieve the same level of reliability... ? ?Achieving this ideal requires widespread demand response and market structures that enable loads...

Wattles, P.

2012-01-01T23:59:59.000Z

383

Data Communication Principles Reliable Data Transfer  

E-Print Network [OSTI]

Principles Switching Reliable Data Transfer Data Rate of a Communication Channel Transmission Media Data Principles Switching Reliable Data Transfer Data Rate of a Communication Channel Transmission Media Data Transmission Fiber vs Copper Wire Weight vs bandwidth Cost Security 11 / 52 #12;Data Communication Principles

Ramkumar, Mahalingam

384

Information Concerning Reliability Impacts under Various System  

Broader source: Energy.gov (indexed) [DOE]

Information Concerning Reliability Impacts under Various System Information Concerning Reliability Impacts under Various System Configurations of the Mirant Potomac River Plant Information Concerning Reliability Impacts under Various System Configurations of the Mirant Potomac River Plant Docket No. EO-05-01: PJM Interconnection, L.L.C. and PEPCO Holdings, Inc. is hereby providing you with additional information concerning reliability impacts under various system conditions associated with the unavailability of the Potomac River Generating Station to serve load in the D.C. area. Also enclosed as part of this submittal is material provided by PEPCO (balance of sentence redacted) In addition, there is a discussion concerning the impacts of demand side response in addressing this situation. Information Concerning Reliability Impacts under Various System

385

Reliability First Corporation | OpenEI  

Open Energy Info (EERE)

Reliability First Corporation Reliability First Corporation Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 110, and contains only the reference case. The dataset uses gigawatts, billion kilowatthours and quadrillion Btu. The data is broken down into generating capacity, electricity generation and energy consumption. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO EIA Gateway Reliability First Corporation SERC Reliability Corporation Data application/vnd.ms-excel icon AEO2011:Renewable Energy Generation by Fuel - SERC Reliability Corporation / Gateway- Reference Case (xls, 118.9 KiB) Quality Metrics Level of Review Peer Reviewed

386

Property:Coordinates | Open Energy Information  

Open Energy Info (EERE)

Coordinates Coordinates Jump to: navigation, search This is a property of type Geographic coordinate. Subproperties This property has the following 11 subproperties: B Black Rock I Geothermal Project Black Rock II Geothermal Project Black Rock III Geothermal Project D Drum Mountain Geothermal Project (3) D cont. Dursley, United Kingdom E EXEN Holdings LLC K Kenya-UNDP Climate Activities L Leeds, United Kingdom P Poland - Economic and Financial Benefits of Distributed Generation Small-Scale, Gas-Fired CHP S San Emidio II Geothermal Project U Uppsala, Sweden Pages using the property "Coordinates" Showing 25 pages using this property. (previous 25) (next 25) 0 0.4 kV remote control (Smart Grid Project) + 56.26392°, 9.501785° + 1 10Charge Inc + 32.778155°, -96.795404° + 12 Voltz Limited + 54.63044°, -2.89984° +

387

Western Electricity Coordinating | OpenEI  

Open Energy Info (EERE)

Western Electricity Coordinating Western Electricity Coordinating Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 117, and contains only the reference case. The dataset uses gigawatts, billion kilowatthours and quadrillion Btu. The data is broken down into generating capacity, electricity generation and energy consumption. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords AEO California EIA Renewable Energy Generation Western Electricity Coordinating Data application/vnd.ms-excel icon AEO2011: Renewable Energy Generation by Fuel - Western Electricity Coordinating Council / California (xls, 119.2 KiB) Quality Metrics Level of Review Peer Reviewed

388

Feedback coordination of limited capability mobile robots  

Science Journals Connector (OSTI)

In some multi-robot applications, such as exploration, predefined task allocation and coordination can fail to function adequately. This failure is attributed to the inability to completely model a robot's interactions with the environment before task execution. Hence, the main focus of this paper is on a feedback coordination mechanism that executes periodically after initial task allocation. This feedback mechanism monitors the individual and group performance of worker robots. If the performance of a worker robot is unsatisfactory, a task reallocation algorithm adjusts the task-robot combinations of the team. Three cases of unsatisfactory robot performance that can be detected by the feedback mechanism include: complete failure, partial failure and poor performance. The task allocation and coordination strategy are applied to a multi-robot exploration task. Initial results from experiments in various types of environments indicate that the feedback coordination mechanism successfully identifies the three forms of robot failure, and improves the system's performance.

Praneel Chand; Dale A. Carnegie

2010-01-01T23:59:59.000Z

389

Ecosystems & Fisheries-Oceanography Coordinated Investigations  

E-Print Network [OSTI]

Ecosystems & Fisheries-Oceanography Coordinated Investigations · Healthy and productive coastal Communities Fishing Industry & Coastal Infrastructure Marine Ecosystem Original Paradigm #12;We had Consumers & Coastal Communities Fishing Industry & Coastal Infrastructure Marine Ecosystem Control

390

Project Management Coordination Office | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Project Management Coordination Office Project Management Coordination Office Project Management Coordination Office The Project Management Coordination Office (PMCO) provides guidance, leadership, training, and tools to Office of Energy Efficiency and Renewable Energy (EERE) management and the field in the area of active project management. PMCO is also charged with providing integrated risk management and oversight of EERE work at numerous field sites. This includes activities ranging from performance and project management to monitoring and auditing. PMCO actively collaborates with EERE Offices and field elements. PMCO primarily engages the Golden Field Office, National Energy Technology Laboratory, Oak Ridge National Laboratory and other DOE Operations Offices. PMCO is EERE's corporate resource for Active Project Management, providing

391

Reliable and Semi-reliable Communication with Authentication in Mobile Ad Hoc Networks  

E-Print Network [OSTI]

Reliable and Semi-reliable Communication with Authentication in Mobile Ad Hoc Networks Falko of wireless ad hoc sensor networks is the error-proneness and, therefore, the unreliability of communication describe a new approach and an according protocol for usage in ad hoc networks that provides reliable

Breu, Ruth

392

IEEE TRANSACTIONS ON RELIABILITY, VOL. 54, NO. 3, SEPTEMBER 2005 421 Reliability Optimization of Distributed Access  

E-Print Network [OSTI]

of the SSA. Index Terms--Branch and bound, distributed access networks, optimization, system reliabilityIEEE TRANSACTIONS ON RELIABILITY, VOL. 54, NO. 3, SEPTEMBER 2005 421 Reliability Optimization of Distributed Access Networks With Constrained Total Cost Fang-Ming Shao, Xuemin (Sherman) Shen, Senior Member

Shen, Xuemin "Sherman"

393

Re: A BILATERAL DOE LABORATORY UTILIZATION AGREEMENT INTRODUCTION  

Broader source: Energy.gov (indexed) [DOE]

Washington, DC 20585 Washington, DC 20585 Date: April (J 2010 Re: A BILATERAL DOE LABORATORY UTILIZATION AGREEMENT INTRODUCTION DOE encourages the collaboration between DOE Laboratories in order to further programmatic goals. This includes exchanging personnel between DOE laboratories to utilize the unique facilities of a particular Laboratory. There has been confusion and inconsistencies on what types of agreements, if any, that may be executed between two DOE laboratories. For example, some labs may not require any agreement while other labs have required agreements with indemnity or over-reaching intellectual property rights. THE AGREEMENT To promote a consistent approach to such collaboration, and after consultation with the laboratories we have developed the attached Bilateral DOE Laboratory Utilization Agreement

394

Piketon Site Partnering Agreement 2011 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Piketon Site Partnering Agreement 2011 Piketon Site Partnering Agreement 2011 Piketon Site Partnering Agreement 2011 On behalf of the taxpayers of this nation and the communities of the four counties surrounding the former Gaseous Diffusion Plant Site in Piketon, Ohio, we, the U.S. Department of Energy and its Prime Contractors, stand together as One Site Team. We enter into this Partnering Agreement with the conviction and shared responsibility to operate and clean up the Piketon Site safely and efficiently -- while protecting the public health and the environment. Piketon Site Partnering Agreement 2011 More Documents & Publications Oak Ridge Operations Office (ORO) & Wastren Advantage, Inc. (WAI) Partnering Agreement For The Transuranic Waste Processing Program Contractor Fee Payments - Portsmouth Paducah Project Office

395

Public Service Company of Colorado v. Batt Agreement  

Broader source: Energy.gov (indexed) [DOE]

Settlement Agreement: Public Service Company of Colorado v. Batt Settlement Agreement: Public Service Company of Colorado v. Batt EM Home | Regulatory Compliance | Environmental Compliance Agreements Settlement Agreement: Public Service Company of Colorado v. Batt Table of Contents A. Definitions B. Transuranic Waste Shipments Leaving Idaho C. Spent Fuel & High-Level Waste Shipments Leaving Idaho D. Shipments of Spent Fuel to INEL E. Treatment & Transfer of Existing Wastes at INEL F. Spent Fuel Programs G. INEL Environmental Restoration Program H. Obtaining Timely Federal Funding for Compliance with This Order I. Federal Funds for This Settlement Agreement J. Good Faith Compliance & Affirmative Support K. Enforcement L. Consent Order Commitments of Consent Order of October 17, 1995 and Appended Settlement Agreement

396

Technical Exchange and Cooperation Agreement between the Department of  

Broader source: Energy.gov (indexed) [DOE]

Technical Exchange and Cooperation Agreement between the Department Technical Exchange and Cooperation Agreement between the Department of Energy and the European Atomic Energy Community Technical Exchange and Cooperation Agreement between the Department of Energy and the European Atomic Energy Community The objective of this technical arrangement is to establish a framework for co-operation between the Parties in the field of nuclear-related technology research and development based upon mutual benefit. The co-operation is intended to occur in specific areas where the programs of the Parties complement one another as well as those in which comparability exists. 4.5.1.1.3.3_eu_agreement.pdf More Documents & Publications International_Agreements_January_2001_December_2004.pdf International Agreements Comments EM International Strategic Plan 2010-2015

397

Notice, Revised Classified Information Nondisclosure Agreement - July 2013  

Broader source: Energy.gov (indexed) [DOE]

Notice, Revised Classified Information Nondisclosure Agreement - Notice, Revised Classified Information Nondisclosure Agreement - July 2013 Notice, Revised Classified Information Nondisclosure Agreement - July 2013 August 29, 2013 - 4:19pm Addthis Notice, Revised Classified Information Nondisclosure Agreement - July 2013 The "Classified Information Nondisclosure Agreement, Standard Form 312" (SF 312) was revised in July 2013 by the Office of the Director of National Intelligence (ODNI) to conform with two new federal statutes: The Financial Services and General Government Appropriations Act (Public Law 112-74); and Whistleblower Protection Enhancement Act (WPEA) (Public Law 112-199). The WPEA strengthens protections for federal employees who disclose evidence of waste, fraud, or abuse. The WPEA requires that each agreement

398

Energy Department Awards Cooperative Agreement to Mississippi State University  

Broader source: Energy.gov [DOE]

Cincinnati The U.S. Department of Energy (DOE) today awarded a cooperative agreement to Mississippi State University, Institute for Clean Energy Technology (MSU-ICET), to continue research efforts in the evaluation of High-Efficiency Particulate Air Filters (HEPA) and other technologies to enhance nuclear safety in the defense waste complex. The total value of the cooperative agreement over five years is $5 million. The project period of the cooperative agreement will be from January 20, 2015 through January 19, 2020.

399

Monticello Mill site Federal Facility Agreement, December 22, 1988 Summary  

Broader source: Energy.gov (indexed) [DOE]

Monticello Monticello Agreement Name Monticello (Utah) Site: Monticello Vicinity Properties NPL Site and Monticello Millsite Federal Facility Agreement Pursuant to CERCLA Section 120, December 22, 1988 State Utah Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA Scope Summary Establish a procedural framework and schedule for developing, implementing, and monitoring appropriate response actions at the Site Parties DOE; US EPA; State of Utah Department of Environmental Health Date 12/22/1988 SCOPE * Identify Interim Remedial Action (IRA) alternatives, if any, which are appropriate at the Site prior to the implementation of final remedial actions for the Site. * Evaluate all past investigative and response actions taken at the Site and documented

400

Advance Funding and Development Agreement: Plains & Eastern Clean Line  

Broader source: Energy.gov (indexed) [DOE]

Advance Funding and Development Agreement: Plains & Eastern Clean Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) More Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) 2013 Annual Planning Summary for the Southwestern Area Power Administration

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

NETL Technology Transfer Agreements & Research Partnerships Available  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

How to Partner How to Partner Technology Transfer NETL Technology Transfer Agreements & Research Partnerships Pouring molten metal into a lost foam, loose sand casting for cast steel armorplate Pouring molten metal into a lost foam, loose sand casting for cast steel armorplate A technology transfer agreement with the National Energy Technology Laboratory (NETL) provides access to the research and development expertise, facilities, and intellectual property of a government research facility. Specializing in fossil fuel energy research, NETL technology transfer options include: Research Partnership Notice - "Seeking Partnerships on Field Research Related to Shale Gas Development" Cooperative Research and Development Agreement (CRADA) Contributed Funds-in Agreement (CFA)

402

GovEnergy 2008 Session Presentation on Power Purchase Agreements  

Broader source: Energy.gov [DOE]

Presentation describes an overview of power purchase agreements given at GovEnergy 2008. The document includes several case studies and considerations for Federal agencies.

403

PROTOTYPE PROGRAMMATIC AGREEMENT BETWEEN THE UNITED STATES DEPARTMENT...  

Energy Savers [EERE]

and Conservation Block Grant Program, the State Energy Plan, and the Weatherization Assistance Program. PROTOTYPE PROGRAMMATIC AGREEMENT BETWEEN THE UNITED STATES DEPARTMENT OF...

404

Argonne, Evigia finalize licensing agreement for next-gen RFID...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

See related New RFID technology tracks and monitors nuclear materials Argonne, Evigia finalize licensing agreement for next-gen RFID sensor technology By Angela Hardin * July 16,...

405

DOE's Oak Ridge Office and UCOR Sign Partnering Agreement  

Broader source: Energy.gov [DOE]

Officials from DOE's Oak Ridge Office and UCOR met to sign a partnering agreement that defines the working arrangement and expectations between the two entities.

406

Microsoft Word - Settlement Agreement - FINAL - 01-06-061.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to resolve the litigation and improve the relationship between DOE and Ecology to be more cooperative and collaborative. This Agreement is intended to resolve Ecology's groundwater...

407

Tri-Party Agreement Hanford Public Involvement Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 Excerpts from the Comment and Response Document on the Tri-Party Agreement Hanford Public Involvement Plan The comments submitted by the Hanford Advisory Board (Advice 251)...

408

Tri-Party Agreement Agencies Annual Hanford Public Involvement...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of 17 Tri-Party Agreement Agencies Annual Hanford Public Involvement Survey 1. How do you usually receive information about Hanford topics? (Please select all that apply) Response...

409

Oregon Willamette River Basin Mitigation Agreement | Open Energy...  

Open Energy Info (EERE)

Willamette River Basin Mitigation Agreement Author State of Oregon Recipient Bonneville Power Administration Published Publisher Not Provided, 10222010 DOI Not Provided Check for...

410

United States and Latvian Governments Sign Agreement to Allow...  

Office of Environmental Management (EM)

Raimonds Vejonis signed the agreement, which will provide for repatriation to Russia of SovietRussian-origin nuclear fuel from Latvia's shutdown research reactors at...

411

Porvair signs long term supply agreement with Honeywell  

Science Journals Connector (OSTI)

The Microfiltrex Division of the Porvair Filtration Group has signed a long term agreement to supply components to a range of Honeywell programmes.

2007-01-01T23:59:59.000Z

412

Statement of Work Service Agreement for Testing and Inspection...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 APPENDIX A STATEMENT OF WORK SERVICE AGREEMENT FOR TESTING AND INSPECTION SERVICES September 18, 2014 1.0 GENERAL SCOPE Historically, The National Renewable Energy Lab Laboratory...

413

Appendix S-50 - Power Purchase Agreement (PPA) - Public Utilities...  

Open Energy Info (EERE)

Power Purchase Agreement (PPA) - Public Utilities Commission Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Instructions:...

414

Draft "Michigan Saves" Loan Loss Reserve Fund Agreement  

Broader source: Energy.gov [DOE]

A sample loan loss reserve agreement between a state or local government and a financial institution setting the terms and conditions of the loan loss reserve fund.

415

Draft Michigan SAVES Loan Loss Reserve Fund Agreement  

Broader source: Energy.gov [DOE]

A sample LRF agreement between a grantee and an financial institution setting the terms and conditions of the loan loss reserve fund.

416

ORNL: Low-Cost Direct Bonded Aluminum (DBA) Substrates (Agreement...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Direct Bonded Aluminum (DBA) Substrates (Agreement ID:23278) 2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer...

417

Third Party Financing and Power Purchasing Agreements for Public...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Power Purchase Agreements for public sector PV projects presented at the TAP Web Seminar on May 27, 2009, includes economic and legal information. Third Party Financing...

418

Waste Isolation Pilot Plant's Excavated Salt Agreement Supports...  

Broader source: Energy.gov (indexed) [DOE]

result in large volumes of excavated salt. Seeking an innovative alternative to landfill disposal, EM's Carlsbad Field Office (CBFO) reached an agreement with Magnum...

419

Policy Statement Number: PS-49 Title/Topic: Building Coordinator  

E-Print Network [OSTI]

. 10. Report all landscape maintenance problems, including drainage problems or grounds upkeep group responsible for coordinating maintenance requests and activities within that building or building Coordinators are responsible for coordinating maintenance requests and activities within the building

Harms, Kyle E.

420

Coordination of Retail Demand Response with Midwest ISO Markets  

E-Print Network [OSTI]

LABORATORY Coordination of Retail Demand Response withXXXXX Coordination of Retail Demand Response with MidwestAC02-05CH11231. Coordination of Retail Demand Response with

Bharvirkar, Ranjit

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Searching coordinate terms with their context from the web  

Science Journals Connector (OSTI)

We propose a method for searching coordinate terms using a traditional Web search engine. Coordinate terms are terms which have the same hypernym. There are several research methods that acquire coordinate terms, but they need parsed corpora ...

Hiroaki Ohshima; Satoshi Oyama; Katsumi Tanaka

2006-10-01T23:59:59.000Z

422

Improving offshore communication by choosing the right coordination  

E-Print Network [OSTI]

Improving offshore communication by choosing the right coordination strategy Matthias Fabriek;Improving offshore communication by choosing the right coordination strategy Page 2 of 92 ABSTRACT This thesis researches communication and coordination in offshore custom software development (CSD) projects

Utrecht, Universiteit

423

Assessment of microelectronics packaging for high temperature, high reliability applications  

SciTech Connect (OSTI)

This report details characterization and development activities in electronic packaging for high temperature applications. This project was conducted through a Department of Energy sponsored Cooperative Research and Development Agreement between Sandia National Laboratories and General Motors. Even though the target application of this collaborative effort is an automotive electronic throttle control system which would be located in the engine compartment, results of this work are directly applicable to Sandia`s national security mission. The component count associated with the throttle control dictates the use of high density packaging not offered by conventional surface mount. An enabling packaging technology was selected and thermal models defined which characterized the thermal and mechanical response of the throttle control module. These models were used to optimize thick film multichip module design, characterize the thermal signatures of the electronic components inside the module, and to determine the temperature field and resulting thermal stresses under conditions that may be encountered during the operational life of the throttle control module. Because the need to use unpackaged devices limits the level of testing that can be performed either at the wafer level or as individual dice, an approach to assure a high level of reliability of the unpackaged components was formulated. Component assembly and interconnect technologies were also evaluated and characterized for high temperature applications. Electrical, mechanical and chemical characterizations of enabling die and component attach technologies were performed. Additionally, studies were conducted to assess the performance and reliability of gold and aluminum wire bonding to thick film conductor inks. Kinetic models were developed and validated to estimate wire bond reliability.

Uribe, F.

1997-04-01T23:59:59.000Z

424

Development in structural systems reliability theory  

Science Journals Connector (OSTI)

This paper is concerned with two topics on structural systems reliability theory. One covers automatic generation of failure mode equations, identifications of stochastically dominant failure modes, and reliability assessment of redundant structures. Reduced stiffness matrixes and equivalent nodal forces representing the failed elements are introduced for expressing the safety margins of the elements, using a matrix method. Dominant failure modes are systematically selected by a branch-and-bound technique and heuristic operations. The other discusses the various optimum design problems based on reliability concept. Those problems are interpreted through a solution to a multi-objective optimization problem.

Y. Murotsu

1986-01-01T23:59:59.000Z

425

Coordinatively unsaturated Al3+ centers as binding sites for...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Coordinatively unsaturated Al3+ centers as binding sites for active catalyst phases on ?-Al2O3. Coordinatively unsaturated Al3+ centers as binding sites for active catalyst...

426

Clean Cities Coordinators and Stakeholders Awarded at the Green...  

Broader source: Energy.gov (indexed) [DOE]

Coordinators and Stakeholders Awarded at the Green Fleet Conference and Expo Clean Cities Coordinators and Stakeholders Awarded at the Green Fleet Conference and Expo October 22,...

427

Fuel Cell Transit Bus Coordination and Evaluation Plan California...  

Broader source: Energy.gov (indexed) [DOE]

Transit Bus Coordination and Evaluation Plan California Fuel Cell Transit Evaluation Team Fuel Cell Transit Bus Coordination and Evaluation Plan California Fuel Cell Transit...

428

DOE Releases EPRI Report on Benefits of Regional Coordination...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

DOE Releases EPRI Report on Benefits of Regional Coordination in Wind Energy Transfers DOE Releases EPRI Report on Benefits of Regional Coordination in Wind Energy Transfers...

429

Effects of surface coordination on the temperature-programmed...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

surface coordination on the temperature-programmed desorption of oxalate from goethite. Effects of surface coordination on the temperature-programmed desorption of oxalate from...

430

SECTION 206 WRDA 96, AS AMENDED MODEL PROJECT PARTNERSHIP AGREEMENT  

E-Print Network [OSTI]

Agreement (PPA) Web page. If there is no approved model posted in the approved model section of the PPA Web funded by the Government and then included in total project costs in the PPA. The sponsor #12;would provide its share of total project costs in accordance with the terms of the PPA. 1. An agreement using

US Army Corps of Engineers

431

Efficient Hybrid Key Agreement Protocol for Wireless Ad Hoc Networks  

E-Print Network [OSTI]

Efficient Hybrid Key Agreement Protocol for Wireless Ad Hoc Networks Xiang-Yang Li Yu Wang Ophir important aspects in ad-hoc wireless networks. To ensure the security, several cryptography protocols must efficient when applied to wireless ad-hoc networks. In this paper, we propose a key agreement protocol

Wang, Yu

432

Center for Fuel Cells I/UCRC Membership Agreement  

E-Print Network [OSTI]

for hydrogen production and the fuel cell electrodes; and (5) motor design and power conditioningCenter for Fuel Cells I/UCRC Membership Agreement This agreement is made this _____ day of Proton Exchange Membrane Fuel Cells (PEMFCs) by performing research in (1) fuel cell design; (2) fuel

Almor, Amit

433

International Environmental Agreements with Mixed Strategies and Investment  

E-Print Network [OSTI]

and Siniscalco (1993) and Barrett (1994); Wagner (2001) and Barrett (2003) review this literature. IEA members- ronmental Agreements (IEA), considering both mixed and pure strategies at the participation stage, in this case, reduction of GHG emissions. International Environmental Agreements (IEAs) attempt to alleviate

Karp, Larry S.

434

Facilities Services/Parking Services Bicycle Locker Rental Agreement  

E-Print Network [OSTI]

Facilities Services/Parking Services Bicycle Locker Rental Agreement Instructions: · Read, complete-Mail) __________________________ BICYCLE LOCKER RENTAL AGREEMENT · A $50 key deposit shall be paid for every locker rented. · Lockers shall period. · The assigned locker shall be used for the purpose of storing a bicycle and commuter accessories

Wagner, Diane

435

SERC Reliability Corporation | OpenEI  

Open Energy Info (EERE)

SERC Reliability Corporation SERC Reliability Corporation Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 113, and contains only the reference case. The dataset uses gigawatts, billion kilowatthours and quadrillion Btu. The data is broken down into generating capacity, electricity generation and energy consumption. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO Carolina EIA Renewable Energy Generation SERC Reliability Corporation Virginia Data application/vnd.ms-excel icon AEO2011: Renewable Energy Generation by Fuel - SERC Reliability Corporation / Virginia-Carolina- Reference Case (xls, 118.9 KiB) Quality Metrics

436

Photovoltaic Module Reliability Workshop 2013 | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and PV Evolutions Impact and Detection of Pyranometer Failure on PV Performance, D.C. Jordan and B. Sekulic of NREL Manufacturing Metrology for c-Si Module ReliabilityDurability,...

437

2014 Transmission Reliability Program Peer Review  

Broader source: Energy.gov [DOE]

The Transmission Reliability Program Peer Review included 20 presentations over 2 days on June 3 - 4, 2014 in Washington, DC. Presentations are available through the links. The agenda is available to download.

438

Apply reliability centered maintenance to sealless pumps  

SciTech Connect (OSTI)

This paper reports on reliability centered maintenance (RCM) which is considered a crucial part of future reliability engineering. RCM determines the maintenance requirements of plants and equipment in their operating context. The RCM method has been applied to the management of critical sealless pumps in fire/toxic risk services, typical of the petrochemical industry. The method provides advantages from a detailed study of any critical engineering system. RCM is a team exercise and fosters team spirit in the plant environment. The maintenance strategy that evolves is based on team decisions and relies on maximizing the inherent reliability built into the equipment. RCM recommends design upgrades where this inherent reliability is being questioned. Sealless pumps of canned motor design are used as main reactor charge pumps in PVC plants. These pumps handle fresh vinyl chloride monomer (VCM), which is both carcinogenic and flammable.

Pradhan, S. (Exxon Chemicals Canada, Ontario (Canada))

1993-01-01T23:59:59.000Z

439

Reliability of lightning resistant overhead distribution lines  

SciTech Connect (OSTI)

An assessment of the 32 year historical reliability of the 13.8 kV electrical distribution system at the Oak Ridge National Laboratory (ORNL) in Tennessee has yielded several conclusions useful In the planning of Industrial power Systems. The system configuration at ORNL has essentially remained unchanged in the last 32 years which allows a meaningful comparison of reliability trends for the plant`s eight overhead distribution lines, two of which were built in the 1960`s with lightning resistant construction techniques. Meticulous records indicating the cause, duration, and location of 135 electric outages in the plant`s distribution system have allowed a reliability assessment to be performed. The assessment clearly shows how differences in voltage construction class, length, age, and maximum elevation above a reference elevation influence the reliability of overhead power distribution lines. Comparisons are also made between the ORNL historical data and predicted failure rates from ANSI and IEEE industry surveys.

Tolbert, L.M.; Cleveland, J.T.; Degenhardt, L.J.

1995-04-01T23:59:59.000Z

440

Reliability Challenges for Solar Energy (Presentation)  

SciTech Connect (OSTI)

PV industry can benefit from reliability testing experience of microelectronics industry . Si modules perform well in field; CdTe/CIGS must be sealed to moisture; CPV in product development stage.

Kurtz, S.

2009-04-27T23:59:59.000Z

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

United States and Latvian Governments Sign Agreement to Allow  

Broader source: Energy.gov (indexed) [DOE]

Latvian Governments Sign Agreement to Allow Latvian Governments Sign Agreement to Allow Nonproliferation and Threat Reduction Cooperation United States and Latvian Governments Sign Agreement to Allow Nonproliferation and Threat Reduction Cooperation April 25, 2005 - 12:25pm Addthis WASHINGTON, D.C. - As part of the Bush administration's ongoing efforts to secure vulnerable nuclear materials worldwide, the Department of Energy (DOE) and the Latvian Ministry of Environment signed an agreement today that will allow collaboration in nonproliferation and threat reduction areas. Secretary of Energy Samuel W. Bodman and Latvian Minister of Environment Raimonds Vejonis signed the agreement, which will provide for repatriation to Russia of Soviet/Russian-origin nuclear fuel from Latvia's shutdown research reactors at Salaspils; security enhancement of the reactor site

442

EM Sees Growth Across Complex in Partnering Agreements with Contractors |  

Broader source: Energy.gov (indexed) [DOE]

Sees Growth Across Complex in Partnering Agreements with Sees Growth Across Complex in Partnering Agreements with Contractors EM Sees Growth Across Complex in Partnering Agreements with Contractors May 30, 2013 - 12:00pm Addthis Representatives of DOE Savannah River Operations Office and liquid waste contractor Savannah River Remediation sign the next generation partnering agreement. Representatives of DOE Savannah River Operations Office and liquid waste contractor Savannah River Remediation sign the next generation partnering agreement. AIKEN, S.C. - DOE Savannah River Operations Office Manager Dave Moody views the partnering relationship between his office and liquid waste contractor Savannah River Remediation (SRR) as an opportunity to view cleanup work from each other's point of view. "While both DOE and SRR continue to work well together, the partnering

443

On-Site Renewable Power Purchase Agreements | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Project Funding » On-Site Renewable Power Purchase Agreements Project Funding » On-Site Renewable Power Purchase Agreements On-Site Renewable Power Purchase Agreements October 7, 2013 - 3:35pm Addthis On-site renewable power purchase agreements (PPAs) allow Federal agencies to fund on-site renewable energy projects with no up-front capital costs incurred. With a PPA, a developer installs a renewable energy system on agency property under an agreement that the agency will purchase the power generated by the system. The agency pays for the system through these power payments over the life of the contract. After installation, the developer owns, operates, and maintains the system for the life of the contract. For more information, read the Federal Energy Mangement Program's (FEMP) introductory guide to PPAs and sample documents.

444

EM Sees Growth Across Complex in Partnering Agreements with Contractors |  

Broader source: Energy.gov (indexed) [DOE]

EM Sees Growth Across Complex in Partnering Agreements with EM Sees Growth Across Complex in Partnering Agreements with Contractors EM Sees Growth Across Complex in Partnering Agreements with Contractors May 30, 2013 - 12:00pm Addthis Representatives of DOE Savannah River Operations Office and liquid waste contractor Savannah River Remediation sign the next generation partnering agreement. Representatives of DOE Savannah River Operations Office and liquid waste contractor Savannah River Remediation sign the next generation partnering agreement. AIKEN, S.C. - DOE Savannah River Operations Office Manager Dave Moody views the partnering relationship between his office and liquid waste contractor Savannah River Remediation (SRR) as an opportunity to view cleanup work from each other's point of view. "While both DOE and SRR continue to work well together, the partnering

445

Los Alamos National Laboratory Consent Agreement, December 10, 1993 Summary  

Broader source: Energy.gov (indexed) [DOE]

Consent Agreement Consent Agreement State New Mexico Agreement Type Consent Agreement Legal Driver(s) New Mexico Hazardous Waste Act/ RCRA Scope Summary Resolve Compliance Orders issued against DOE regarding the placement of transuranic waste on existing pads. The agreement will result in DOE subsequently placing transuranic waste on pads that are compliant with RCRA and the NM Hazardous Waste Act. Parties DOE; University of California; New Mexico Environment Department Date 12/10/1993 SCOPE * Establish a remediation plan and compliance schedule for placing transuranic mixed waste in storage areas that comply with the New Mexico Hazardous Waste Act (NMHWA). * Resolve issues raised by New Mexico Compliance Orders 93-01, 93-02, 93-03, and 93-04 issued against DOE and the University of California regarding violations of the

446

Cooperative Agreement Awarded to Energy Communities Alliance to Assist DOE  

Broader source: Energy.gov (indexed) [DOE]

Cooperative Agreement Awarded to Energy Communities Alliance to Cooperative Agreement Awarded to Energy Communities Alliance to Assist DOE Interface with Local Governments on Cleanup Missions Cooperative Agreement Awarded to Energy Communities Alliance to Assist DOE Interface with Local Governments on Cleanup Missions February 1, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The Department of Energy (DOE) today awarded a $3.1 million, five-year cooperative agreement to the Energy Communities Alliance (ECA), of Washington, D.C. to continue collaborate efforts between DOE and local governments to solve challenges posed by the Office of Environmental Management's nuclear waste management, changing DOE missions and ongoing cleanup at DOE sites. The purpose of the cooperative agreement with ECA is to continue activities

447

United States, Russia Sign Agreement to Further Research and Development  

Broader source: Energy.gov (indexed) [DOE]

States, Russia Sign Agreement to Further Research and States, Russia Sign Agreement to Further Research and Development Collaboration in Nuclear Energy and Security United States, Russia Sign Agreement to Further Research and Development Collaboration in Nuclear Energy and Security September 16, 2013 - 11:18am Addthis NEWS MEDIA CONTACT (202) 586-4940 VIENNA - U.S. Secretary of Energy Ernest Moniz and Director General of the Russian Federation State Corporation "Rosatom" Sergey Kirienko today signed the Agreement between the Government of the United States of America and the Government of the Russian Federation on Cooperation in Nuclear- and Energy-Related Scientific Research and Development on the margins of the International Atomic Energy Agency's General Conference in Vienna, Austria. The Agreement provides the legal framework necessary to expand cooperation

448

DOE Announces Cooperative Agreement with USEC for American Centrifuge  

Broader source: Energy.gov (indexed) [DOE]

DOE Announces Cooperative Agreement with USEC for American DOE Announces Cooperative Agreement with USEC for American Centrifuge Demonstration Project DOE Announces Cooperative Agreement with USEC for American Centrifuge Demonstration Project March 23, 2010 - 12:21pm Addthis Washington, D.C. - The U.S. Department of Energy today announced that it finalized a cost-shared $90 million cooperative agreement with USEC Inc. to provide support for the continued development and demonstration of the American Centrifuge technology. The Department sees promise in this advanced technology, and last summer announced a willingness to invest in it. The agreement provides for the manufacturing and operation of advanced centrifuges in a cascade configuration to demonstrate the commercial viability of its American Centrifuge Plant.

449

Sample Documents for On-Site Renewable Power Purchase Agreements |  

Broader source: Energy.gov (indexed) [DOE]

Funding » On-Site Renewable Power Purchase Agreements » Funding » On-Site Renewable Power Purchase Agreements » Sample Documents for On-Site Renewable Power Purchase Agreements Sample Documents for On-Site Renewable Power Purchase Agreements October 7, 2013 - 3:37pm Addthis The Federal Energy Management Program (FEMP) works with Federal agencies and partners to assemble sample documents from past on-site renewable power purchase agreement (PPA) projects to help streamline the PPA process. Requests for Proposal and Contracts Sample documents are available for the following requests for proposal: Photovoltaics at the Department of Energy's (DOE) Princeton Plasma Physics Laboratory: PPA request for proposal issued by DLA Energy on behalf of Princeton Plasma Physics Laboratory. National Renewable Energy Laboratory (NREL) Photovoltaics Opportunity

450

DOE Announces Cooperative Agreement with USEC for American Centrifuge  

Broader source: Energy.gov (indexed) [DOE]

Cooperative Agreement with USEC for American Cooperative Agreement with USEC for American Centrifuge Demonstration Project DOE Announces Cooperative Agreement with USEC for American Centrifuge Demonstration Project March 23, 2010 - 12:00am Addthis Washington, D.C. - The U.S. Department of Energy today announced that it finalized a cost-shared $90 million cooperative agreement with USEC Inc. to provide support for the continued development and demonstration of the American Centrifuge technology. The Department sees promise in this advanced technology, and last summer announced a willingness to invest in it. The agreement provides for the manufacturing and operation of advanced centrifuges in a cascade configuration to demonstrate the commercial viability of its American Centrifuge Plant. The costs will be shared between the Department and USEC. The

451

Fernald Triparty Agreement as revised, July 18, 1986 Summary  

Broader source: Energy.gov (indexed) [DOE]

Federal Facility Compliance Agreement Federal Facility Compliance Agreement State Ohio Agreement Type Compliance Agreement Legal Driver(s) RCRA/CERCLA/CWA Scope Summary Establish a Compliance Plan to ensure compliance by DOE with existing environmental statutes, and implementing regulations, including the Clean Air Act, RCRA, and CERCLA, at FMPC Parties DOE; US EPA Date 7/18/1986 SCOPE * Establish a Compliance Plan to ensure compliance by DOE with existing environmental statutes, and implementing regulations, including the Clean Air Act, RCRA, and CERCLA, at FMPC. * Ensure that the environmental impacts associated with past and present activities at the FMPC are thoroughly investigated, and appropriate remedial response action taken. * This Agreement does not address compliance, or the lack thereof, by DOE's FMPC

452

PROTOTYPE PROGRAMMATIC AGREEMENT BETWEEN THE UNITED STATES DEPARTMENT OF  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PROTOTYPE PROGRAMMATIC AGREEMENT BETWEEN THE UNITED STATES PROTOTYPE PROGRAMMATIC AGREEMENT BETWEEN THE UNITED STATES DEPARTMENT OF ENERGY, THE [INSERT STATE NAME] ENERGY OFFICE AND THE [INSERT STATE NAME] STATE HISTORIC PRESERVATION OFFICE REGARDING EECBG, SEP AND WAP UNDERTAKINGS February 5, 2010 PROTOTYPE PROGRAMMATIC AGREEMENT BETWEEN THE UNITED STATES DEPARTMENT OF ENERGY, THE [INSERT STATE NAME] ENERGY OFFICE AND THE [INSERT STATE NAME] STATE HISTORIC PRESERVATION OFFICE REGARDING EECBG, SEP AND WAP UNDERTAKINGS February 5, 2010 Prototype programmatic agreement for the Energy Efficiency and Conservation Block Grant Program, the State Energy Plan, and the Weatherization Assistance Program. PROTOTYPE PROGRAMMATIC AGREEMENT BETWEEN THE UNITED STATES DEPARTMENT OF ENERGY, THE [INSERT STATE NAME] ENERGY OFFICE AND THE [INSERT STATE NAME]

453

State Agreement-In-Principle Program Guidance Memorandum | Department of  

Broader source: Energy.gov (indexed) [DOE]

State Agreement-In-Principle Program Guidance Memorandum State Agreement-In-Principle Program Guidance Memorandum State Agreement-In-Principle Program Guidance Memorandum United States GovernmentDepartment of Energy Memorandum DATE: December 22, 1995 REPLY TO ATTN OF: EM-75 SUBJECT: State Agreement-in-Principle Program Guidance TO: Manager, Albuquerque Operations Office Manager, Chicago Operations Office Manager, Idaho Operations Office Manager, Nevada Operations Office Manager, Oak Ridge Operations Office Manager, Ohio Field Office Manager, Richland Operations Office Manager, Rocky Flats Field Office Manager, Oakland Operations Office Manager, Savannah River Operations Office The purpose of this memorandum is to provide you with guidance on the State Agreement-in-Principle (AIP) program. The guidance includes a collection of

454

United States, Russia Sign Agreement to Further Research and Development  

Broader source: Energy.gov (indexed) [DOE]

United States, Russia Sign Agreement to Further Research and United States, Russia Sign Agreement to Further Research and Development Collaboration in Nuclear Energy and Security United States, Russia Sign Agreement to Further Research and Development Collaboration in Nuclear Energy and Security September 16, 2013 - 11:18am Addthis NEWS MEDIA CONTACT (202) 586-4940 VIENNA - U.S. Secretary of Energy Ernest Moniz and Director General of the Russian Federation State Corporation "Rosatom" Sergey Kirienko today signed the Agreement between the Government of the United States of America and the Government of the Russian Federation on Cooperation in Nuclear- and Energy-Related Scientific Research and Development on the margins of the International Atomic Energy Agency's General Conference in Vienna, Austria. The Agreement provides the legal framework necessary to expand cooperation

455

A method for setting reliability performance criteria  

SciTech Connect (OSTI)

Reliability performance criteria are required for monitoring under the Maintenance Rule. This paper presents a probabilistic approach for establishing these performance criteria on a plant-specific basis. Results are presented for a number of case studies, and are summarized in terms of a deterministic formula. This formula was used to develop and document reliability performance criteria for all Maintenance Rule systems/subsystems at the Vermont Yankee Nuclear Power Station.

Burns, K.J.; Turcotte, R.T. [Yankee Atomic Electric Co., Bolton, MA (United States). Nuclear Engineering Dept.

1996-08-01T23:59:59.000Z

456

Communication Reliability in Network on Chip Designs  

E-Print Network [OSTI]

duplication with parity (DAP) and triplication error correction (TEC) with Green bus coding for crosstalk avoidances to guard against crosstalk induced errors is presented in [49] and [50] respectively. Ying et al. in [42] present the design of a reliable... duplication with parity (DAP) and triplication error correction (TEC) with Green bus coding for crosstalk avoidances to guard against crosstalk induced errors is presented in [49] and [50] respectively. Ying et al. in [42] present the design of a reliable...

Kumar, Reeshav

2012-10-19T23:59:59.000Z

457

Clean Cities: Mammoth Cave National Park Coordinator Meeting  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mammoth Cave National Park Coordinator Mammoth Cave National Park Coordinator Meeting to someone by E-mail Share Clean Cities: Mammoth Cave National Park Coordinator Meeting on Facebook Tweet about Clean Cities: Mammoth Cave National Park Coordinator Meeting on Twitter Bookmark Clean Cities: Mammoth Cave National Park Coordinator Meeting on Google Bookmark Clean Cities: Mammoth Cave National Park Coordinator Meeting on Delicious Rank Clean Cities: Mammoth Cave National Park Coordinator Meeting on Digg Find More places to share Clean Cities: Mammoth Cave National Park Coordinator Meeting on AddThis.com... Coordinator Basics Outreach Education & Webinars Meetings Reporting Contacts Mammoth Cave National Park Coordinator Meeting The 2007 Clean Cities coordinator meeting at Mammoth Cave National Park

458

32 - Reliability in instrumentation and control  

Science Journals Connector (OSTI)

Publisher Summary Reliability is generally defined as the probability that a component or assembly operates without failure for a prescribed period under specified conditions. To ensure a meaningful result, the conditions of operation, both physical and electrical, must be specified in detail as the standard of performance is required. The chapter also discusses reliability and mean time between failures (MTBF). It is convenient to look for value; the one usually adopted is MTBF. This applies to a maintained system in which each failure is repaired and the equipment is then restored to service. For systems, which cannot be maintained, such as satellite control systems, the value of interest is the mean time to failure (MTTF). Another measure of reliability that is often quoted is failure ratethat is, the number of failures per unit time. This is particularly useful in relation to individual components because it is the most convenient figure to use when estimating the reliability of a complete system in terms of the performance of its components. Equipment manufacturers generally quote MTBF as an indication of reliability as the value does not depend upon the operating period, which is often different for each user. However, reliability is the factor of prime concern to the user, and the relation between this and MTBF is thus important. The simplest case occurs when the failure rate, and thus, MTBF is constant with time.

J. Cluley

2003-01-01T23:59:59.000Z

459

Reliability improvement of distribution systems using SSVR  

Science Journals Connector (OSTI)

This paper presents a reliability assessment algorithm for distribution systems using a Static Series Voltage Regulator (SSVR). Furthermore, this algorithm considers the effects of Distributed Generation (DG) units, alternative sources, system reconfiguration, load shedding and load adding on distribution system reliability indices. In this algorithm, load points are classified into 8 types and separated restoration times are considered for each class. Comparative studies are conducted to investigate the impacts of DG and alternative source unavailability on the distribution system reliability. For reliability assessment, the customer-oriented reliability indices such as SAIFI, SAIDI, CAIDI ASUI and also load- and energy-oriented indices such as ENS and AENS are evaluated. The effectiveness of the proposed algorithm is examined on the two standard distribution systems consisting of 33 and 69 nodes. The best location of the SSVR in distribution systems is determined based on different reliability indices, separately. Results show that the proposed algorithm is efficient for large-scale radial distribution systems and can accommodate the effects of fault isolation and load restoration.

Mehdi Hosseini; Heidar Ali Shayanfar; Mahmoud Fotuhi-Firuzabad

2009-01-01T23:59:59.000Z

460

Reliability-Based Prioritizing Maintenance Policy for Distribution System  

Science Journals Connector (OSTI)

This paper presents an approach to prioritize maintenance tasks in power distribution system based on reliability models. This approach define weighted average system reliability index WASRI employing reliability indices SAIFI, SAIDI, MAIFI and interruption ... Keywords: Maintenance management, distribution reliability, reliability indices

Zhang Yong; Sun Xiaorong; Chen Hao; Fangxing Li

2010-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Coordinating Permit Office | OpenEI Community  

Open Energy Info (EERE)

Coordinating Permit Office Coordinating Permit Office Home Kyoung's picture Submitted by Kyoung(155) Contributor 9 July, 2013 - 20:57 GRR 3rd Quarter - Stakeholder Update Meeting Alaska analysis appropriations Categorical Exclusions Coordinating Permit Office Cost Mechanisms Cost Recovery geothermal Hawaii NEPA permitting quarterly meeting White Papers On June 26th, we held the 3rd Quarter GRR Stakeholder Update at the Grand Sierra Resort in Reno, NV. The meeting was well-attended with over 40 attendees, including in-person and webinar attendance. Thanks to all who attended! Files: application/pdf icon Presentation: 3rd Quarterly Stakeholder Update Meeting application/vnd.openxmlformats-officedocument.presentationml.presentation icon Mock-up: GRR Permitting Wizard Interface Kyoung's picture Submitted by Kyoung(155)

462

Transportation External Coordination Working Group (TEC)  

Broader source: Energy.gov (indexed) [DOE]

Transportation External Coordination Working Group (TEC) Transportation External Coordination Working Group (TEC) July 17-19, 2001 Cincinnati, Ohio Meeting Summary The Transportation External Coordination Working Group (TEC) held its 19 th semi-annual meeting July 17-19, 2001, in Cincinnati, Ohio. One hundred fifteen people attended (see Appendix A for listing of participants). Jim Carlson, U.S. Department of Energy (DOE) Office of Civilian Radioactive Waste Management (OCRWM) and TEC co-chair, welcomed participants to the meeting. He then introduced Robert Owen of the Ohio Department of Health, and Jim Richter of the Cincinnati/Hamilton County Emergency Management Agency, who also made some welcoming remarks. Topic Group Meetings Tribal Issues Topic Group Issues discussed during this meeting included the Federal Railroad Administration (FRA) rail safety pilot

463

Handbook of normal frames and coordinates  

E-Print Network [OSTI]

The main subject of the book is an up-to-date and in-depth survey of the theory of normal frames and coordinates in differential geometry. The book can be used as a reference manual, review of the existing results and introduction to some new ideas and developments. In the book can be found practically all existing essential results and methods concerning normal frames and coordinates. Most of the results are represented in full detail with full, in some cases new, proofs. All classical results are expanded and generalized in various directions. Theorems of existence, uniqueness and, possibly, holonomicity of the normal frames and coordinates are proved; mostly, the proofs are constructive and some their parts can be used independently for other tasks. Besides published results, their extensions and generalizations, the book contains completely new results which appear for the first time.

Bozhidar Z. Iliev

2006-10-01T23:59:59.000Z

464

Transportation External Coordination Working Group (TEC)  

Broader source: Energy.gov (indexed) [DOE]

Portland, Oregon - February 6-7, 2001 Portland, Oregon - February 6-7, 2001 Transportation External Coordination Working Group (TEC) February 6-7, 2001 Portland, Oregon Meeting Summary The Transportation External Coordination Working Group (TEC) held its 18 th semi-annual meeting February 6-7, 2001, in Portland, Oregon. Attending were 125 representatives from national, State, Tribal and local government organizations, industry and professional groups and other interested parties/DOE programs who meet to address a variety of issues related to DOE's radioactive materials transportation activities and provide continuing and improved coordination between DOE, other levels of government, and outside organizations with DOE transportation-related responsibilities. PLENARY I - TRANSCOM 2000 PRESENTATION (February 6)

465

Supply chain coordination through rebate induced contracts  

Science Journals Connector (OSTI)

In this paper three different types of rebate induced contract namely direct-rebate and revenue sharing contract; downward direct rebate contract; direct-rebate and effort sharing contract are proposed for supply chain coordination perspective. Effectiveness and flexibility of proposed contracts under linear and iso-elastic demand are discussed analytically. It is shown that under certain conditions both manufacturer and retailer can gain more profit by means of appropriate coordination contracts. Several important implications are derived analytically to point out relationship among characteristically different contracts. Results are illustrated with numerical examples.

Subrata Saha

2013-01-01T23:59:59.000Z

466

Coordinate Systems in One and Two Dimensions  

E-Print Network [OSTI]

joining these two points makes* with a given line,-. A broader definition is given by Fischer** when he defines coordinates as numbers which determine single"" valuedly the position of a geometric element,and which are,vice versa^determined single... valuedly by such positionjWith the furth- VaYieCtiOK er property that the continuousAof the coordinates^or of the pos- ition of the element causes a cprresponding variation in the oth- er.Still more comprehensive definitions are given by a S c o t t ^ w h...

Wood, Frank Edwin

1914-06-01T23:59:59.000Z

467

WC_2000_007_CLASS_WAIVER_Under_a_DOE_Funding_Agreement_Relat...  

Broader source: Energy.gov (indexed) [DOE]

0007CLASSWAIVERUnderaDOEFundingAgreementRelat.pdf WC2000007CLASSWAIVERUnderaDOEFundingAgreementRelat.pdf WC2000007CLASSWAIVERUnderaDOEFundingAgreementR...

468

Efficient and Reliable Reactive Power Supply and Consumption … Insights from an Integrated Program of Engineering and Economic Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

82 82 Efficient and Reliable Reactive Power Supply and Consumption - Insights from an Integrated Program of Engineering and Economic Research Robert J. Thomas, Timothy D. Mount, Richard Schuler, William Schulze, Ray Zimmerman, Fernando Alvarado, Bernard C. Lesieutre, Philip N. Overholt, and Joseph H. Eto Preprint version of paper Electricity Journal Energy Analysis Department Ernest Orlando Lawrence Berkeley National Laboratory 1 Cyclotron Road, MS 90R4000 Berkeley CA 94720-8136 Environmental Energy Technologies Division January 2008 http://eetd.lbl.gov/ea/EMS/EMS_pubs.html The work described in this report was coordinated by the Consortium for Electric Reliability, Technology Solutions and was funded under the Office of Electricity

469

COLLECTIVE BARGAINING AGREEMENT BETWEEN Department of Energy Headquarters  

Broader source: Energy.gov (indexed) [DOE]

COLLECTIVE BARGAINING COLLECTIVE BARGAINING AGREEMENT BETWEEN Department of Energy Headquarters and the PREAMBLE This collective bargaining agreement is entered into to prescribe certain rights and obligations of the employees of the Department of Energy (DOE) Headquarters represented by the National Treasury Employees Union (NTEU) and to delineate procedures which are designed to meet the special requirements and needs of DOE Headquarters. The provisions of this agreement have been negotiated and should be interpreted in a manner consistent with the requirements of an effective and efficient Department. The Department of Energy Headquarters and the National

470

17.1 - Interagency Acquisitions, Interagency Transactions, and Interagency Agreements  

Broader source: Energy.gov (indexed) [DOE]

June 2012) June 2012) 1 Interagency Acquisitions, Interagency Transactions, and Interagency Agreements CONTENTS Guiding Principles  This chapter provides guidance on interagency acquisitions, interagency transactions and interagency agreements  In addition to interagency acquisitions authorized by the Economy Act, Federal Acquisition Regulation (FAR) 17.5 is revised to broaden the scope of coverage to address all Interagency Acquisitions to include orders over $500,000 issued against Federal Supply Schedules.  Determination of best procurement approach is required for an assisted acquisition or a direct acquisition. The analysis is different for these two determinations.  An assisted acquisition requires a written interagency agreement to include any agency unique

471

Intellectual Property Provisions (CSB-1003) Cooperative Agreement Research,  

Broader source: Energy.gov (indexed) [DOE]

Intellectual Property Provisions (CSB-1003) Cooperative Agreement Intellectual Property Provisions (CSB-1003) Cooperative Agreement Research, Development, or Demonstration Domestic Small Businesses Intellectual Property Provisions (CSB-1003) Cooperative Agreement Research, Development, or Demonstration Domestic Small Businesses 01. FAR 52.227-1 Authorization and Consent (JUL 1995)-Alternate I (APR 1984) 02. FAR 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (AUG 1996) This clause is not applicable if the award is for less than $100,000, in aggregate. NOTE: In reading these provisions, any reference to "contractor" shall mean "recipient," and any reference to "contract" or "subcontract" shall mean "award" or "subaward." CSB-1003.PDF�

472

Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.  

SciTech Connect (OSTI)

The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

473

Puget Sound area electric reliability plan. Draft environmental impact statement  

SciTech Connect (OSTI)

The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

Not Available

1991-09-01T23:59:59.000Z

474

Measuring eating disorder attitudes and behaviors: a reliability generalization study  

E-Print Network [OSTI]

I used reliability generalization procedures to determine the mean score reliability of the Eating Disorder Inventory (EDI), the Eating Attitudes Test (EAT), and the Bulimia Test (BULIT). Reliability generalization is a type of meta-analysis used...

Pearson, Crystal Anne

2009-05-15T23:59:59.000Z

475

Reliable Deployment of Component-based Applications into Distributed Environments  

E-Print Network [OSTI]

Reliable Deployment of Component-based Applications into Distributed Environments Abbas Heydarnoori's quality of service properties such as reliability. In distributed sys- tems, the reliability that should be deployed into a large distributed en- vironment, several deployment configurations are typ

Czarnecki, Krzysztof

476

Considering Risk-Taking Behavior in Travel Time Reliability  

E-Print Network [OSTI]

wide distribution of preferences for speed and reliability.Distribution of Motorists Preference for Travel Time and Reliability:time, reliability and cost have normal distributions, i.e. ,

2005-01-01T23:59:59.000Z

477

GAO-06-811 Information Security: Coordination of Federal Cyber Security Research and Development  

Broader source: Energy.gov (indexed) [DOE]

the Chairman, Committee on the Chairman, Committee on Government Reform, House of Representatives INFORMATION SECURITY Coordination of Federal Cyber Security Research and Development September 2006 GAO-06-811 What GAO Found United States Government Accountability Office Why GAO Did This Study Highlights Accountability Integrity Reliability September 2006 INFORMATION SECURITY Coordination of Federal Cyber Security Research and Development Highlights of GAO-06-811, a report to Chairman, Committee on Government Reform, House of Representatives Research and development (R&D) of cyber security technology is essential to creating a broader range of choices and more robust tools for building secure, networked computer systems in the federal government and in the private sector. The National

478

Quantum mechanics with coordinate dependent noncommutativity  

SciTech Connect (OSTI)

Noncommutative quantum mechanics can be considered as a first step in the construction of quantum field theory on noncommutative spaces of generic form, when the commutator between coordinates is a function of these coordinates. In this paper we discuss the mathematical framework of such a theory. The noncommutativity is treated as an external antisymmetric field satisfying the Jacobi identity. First, we propose a symplectic realization of a given Poisson manifold and construct the Darboux coordinates on the obtained symplectic manifold. Then we define the star product on a Poisson manifold and obtain the expression for the trace functional. The above ingredients are used to formulate a nonrelativistic quantum mechanics on noncommutative spaces of general form. All considered constructions are obtained as a formal series in the parameter of noncommutativity. In particular, the complete algebra of commutation relations between coordinates and conjugated momenta is a deformation of the standard Heisenberg algebra. As examples we consider a free particle and an isotropic harmonic oscillator on the rotational invariant noncommutative space.

Kupriyanov, V. G. [CMCC, Universidade Federal do ABC, Santo Andr, SP (Brazil)] [CMCC, Universidade Federal do ABC, Santo Andr, SP (Brazil)

2013-11-15T23:59:59.000Z

479

ELICITING COORDINATION WITH REBATES PATRICK MAILLE  

E-Print Network [OSTI]

ELICITING COORDINATION WITH REBATES PATRICK MAILL´E AND NICOL´AS E. STIER-MOSES Institut Telecom considers a mechanism based on rebates that aims at reducing congestion in urban networks. The framework helps select rebate levels so that enough commuters switch to modes that are under-utilized. Indeed

Paris-Sud XI, Université de

480

MARY H. SAUNDERS Director, Standards Coordination Office  

E-Print Network [OSTI]

Office, NIST. In this capacity, she represents NIST and its significant interests in the standards.S. and world markets by coordinating Commerce Department strategies, policies and programs with U.S. industries Services Division. In that capacity, she administered a range of standards-related programs to provide

Note: This page contains sample records for the topic "reliability coordination agreement" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Molecular Coordination of Hierarchical Self-Assembly  

E-Print Network [OSTI]

Molecular Coordination of Hierarchical Self-Assembly Technical Report UT-CS-10-662 Bruce J. Mac to self-assemble into multiscale complex hierarchical systems. Keywords: algorithmic assembly, embodied, nano communication, nanofabrication, nanotechnology, Moore's Law, self-assembly, self-organization. 1

MacLennan, Bruce

482

COLLABORATION IN SOFTWARE ENGINEERING ATHEORY OF COORDINATION  

E-Print Network [OSTI]

decisions is a central concern of software engineering. We present a theory in which coordination of engineering decisions is modeled as a distributed constraint satisfaction problem (DCSP). We derive six hypotheses, predicting how the distribution of decisions over developers and the density of constraints among

Herbsleb, James D.

483

Generator-coordinate theory of molecular spectra  

Science Journals Connector (OSTI)

We review the merits and shortcomings of the Born-Oppenheimer separation and suggest a nonadiabatic approach to molecular spectra using the generator-coordinate method. The adiabatic approximation and the new scheme are worked out in parallel for diatomic molecules.

Luc Lathouwers

1978-11-01T23:59:59.000Z

484

Bioinspired Environmental Coordination in Spatial Computing Systems  

E-Print Network [OSTI]

Bioinspired Environmental Coordination in Spatial Computing Systems Justin Werfel jkwerfel tissues. We suggest in closing a classification scheme for capabilities of environmental elements of environmental elements that we hope will aid the future study and design of such systems. This principle

Napp, Nils

485

Position Description Website and Video Coordinator  

E-Print Network [OSTI]

, feature content that supports the School's mission and employs best practices (i.e. chunking content, short pages, bulleted list, etc.); follow best practices with search engine optimization; creating clearPosition Description Website and Video Coordinator School of Global Environmental Sustainability

Barnes, Elizabeth A.

486

Modelling Reliability of Train Arrival Times  

E-Print Network [OSTI]

This paper deals with the scheduling of trains so as to minimise train trip times, whilst maximising reliability of arrival times. The amount of risk of delay associated with a schedule is used as the reliability component of a constrained schedule optimisation model. The paper outlines the model developed to quantify the risk of delays to individual trains, as well as to specific track segments and to the schedule as a whole. The risk model, which deals with single track operations, can be used to estimate the likely impact on reliability of arrival times of changes in train frequencies and operating practices; track and station infrastructure investment strategies; and train technology upgrading. An application of the model to the optimisation of schedules on a track corridor is described. The results obtained using the model are compared with the schedules used by train operations planning staff, in terms of overall delay and timetable reliability. The results highlight the significance of including a measure of timetable reliability, such as risk of delays, in the objective function for scheduling optimisation.

L. Ferreira; A. Higgins

487

Integration of NDE Reliability and Fracture Mechanics  

SciTech Connect (OSTI)

The Pacific Northwest Laboratory is conducting a four-phase program for measuring and evaluating the effectiveness and reliability of in-service inspection (lSI} performed on the primary system piping welds of commercial light water reactors (LWRs). Phase I of the program is complete. A survey was made of the state of practice for ultrasonic rsr of LWR primary system piping welds. Fracture mechanics calculations were made to establish required nondestrutive testing sensitivities. In general, it was found that fatigue flaws less than 25% of wall thickness would not grow to failure within an inspection interval of 10 years. However, in some cases failure could occur considerably faster. Statistical methods for predicting and measuring the effectiveness and reliability of lSI were developed and will be applied in the "Round Robin Inspections" of Phase II. Methods were also developed for the production of flaws typical of those found in service. Samples fabricated by these methods wilI be used in Phase II to test inspection effectiveness and reliability. Measurements were made of the influence of flaw characteristics {i.e., roughness, tightness, and orientation) on inspection reliability. These measurernents, as well as the predictions of a statistical model for inspection reliability, indicate that current reporting and recording sensitivities are inadequate.

Becker, F. L.; Doctor, S. R.; Heas!er, P. G.; Morris, C. J.; Pitman, S. G.; Selby, G. P.; Simonen, F. A.

1981-03-01T23:59:59.000Z

488

DOE Signs Cooperative Agreement for Carbon Capture Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

Signs Cooperative Agreement for Carbon Capture Project Signs Cooperative Agreement for Carbon Capture Project DOE Signs Cooperative Agreement for Carbon Capture Project June 18, 2010 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy has signed a cooperative agreement with NRG Energy Inc. (NRG) for the Parish Post-Combustion CO2 Capture and Sequestration Project to design, construct, and operate a system that will capture and store approximately 400,000 tons of carbon dioxide (CO2) per year. The project, which will be managed by the Office of Fossil Energy's National Energy Technology Laboratory, was selected under DOE's Clean Coal Power Initiative, a collaboration between the federal government and private industry working toward low-emission, coal-based power generation technology. The project team aims to demonstrate that post-combustion carbon capture

489

Microsoft Word - Settlement Agreement - FINAL - 01-06-061.doc  

Broader source: Energy.gov (indexed) [DOE]

SETTLEMENT AGREEMENT re: WASHINGTON v. BODMAN, SETTLEMENT AGREEMENT re: WASHINGTON v. BODMAN, Civil No. 2:03-cv-05018-AAM January 6, 2006 I. INTRODUCTION The Department of Energy's (DOE) and the Washington State Department of Ecology's (Ecology) shared interest in the effective cleanup of the Hanford Site provides an opportunity to resolve the litigation involving the Hanford Solid Waste EIS. The overarching goal of this Settlement Agreement is to resolve the litigation and improve the relationship between DOE and Ecology to be more cooperative and collaborative. This Agreement is intended to resolve Ecology's groundwater analysis concerns in the HSW EIS and to provide an approach to analyze waste management actions at the Hanford Site. It is important to Ecology and DOE that on- going waste management operations and progress on tank waste treatment and closure continue.

490

United States and Italy Sign Nuclear Energy Agreements | Department of  

Broader source: Energy.gov (indexed) [DOE]

United States and Italy Sign Nuclear Energy Agreements United States and Italy Sign Nuclear Energy Agreements United States and Italy Sign Nuclear Energy Agreements September 30, 2009 - 1:23pm Addthis U.S. Secretary of Energy Steven Chu and Italian Minister for Economic Development Claudio Scajola today signed two important nuclear energy agreements that may lead to construction of new nuclear power plants and improved cooperation on advanced nuclear energy systems and fuel cycle technologies in both countries. The U.S.-Italy Joint Declaration Concerning Industrial and Commercial Cooperation in the Nuclear Energy Sector, which was signed on behalf of the United States by Secretary Chu and Deputy Secretary of Commerce Dennis F. Hightower, affirms the strong interest of the United States and Italy to encourage their respective nuclear industries to seek opportunities for the

491

NREL: Technology Transfer - Cooperative Research and Development Agreements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cooperative Research and Development Agreements Cooperative Research and Development Agreements NREL uses a cooperative research and development agreement (CRADA) when a partner and the lab intend to collaborate on a project. It protects a company's and NREL's existing intellectual property, and allows the company to negotiate for an exclusive field-of-use license to subject inventions that arise during the CRADA's execution. The agreement type used depends on the business, and the specific partnership selected is determined on a case-by-case basis. Types CRADA types include: Shared-Resources A joint research project between NREL and a partner to develop, advance, or commercialize an NREL-developed technology without funds changing hands. It must fit within the scope of a project at NREL that's funded by the U.S.

492

Settlement Agreement, Sandia Corporation - SSA-2011-01 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Settlement Agreement, Sandia Corporation - SSA-2011-01 Settlement Agreement, Sandia Corporation - SSA-2011-01 Settlement Agreement, Sandia Corporation - SSA-2011-01 March 24, 2011 Settlement Agreement between DOE/NNSA and Sandia Corporation for Adverse Classified Information Security Trend at Sandia National Laboratories This letter concerns the investigation by the Office of Health, Safety and Security's Office of Enforcement into the adverse trend of classified information security incidents at Sandia National Laboratories. We provided Sandia Corporation (Sandia) with a copy of the Investigation Report dated June 10, 2010, entitled Adverse Class(fied Information Security Trend at Sandia National Laboratories. On August 18, 2010, Sandia and Department of Energy (DOE) representatives participated in an enforcement conference

493

Monticello Mill site Federal Facility Agreement, December 22, 1988  

Broader source: Energy.gov (indexed) [DOE]

: Monticello Vicinity Properties NPL Site and Monticello Millsite Federal Facility AgreemPage 1 of 36 : Monticello Vicinity Properties NPL Site and Monticello Millsite Federal Facility AgreemPage 1 of 36 EM Home | Regulatory Compliance | Environmental Compliance Agreements Monticello (Utah) Site: Monticello Vicinity Properties NPL Site and Monticello Millsite Federal Facility Agreement Pursuant to CERCLA Section 120, December 22, 1988 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION VIII and THE STATE OF UTAH DEPARTMENT OF HEALTH and THE UNITED STATES DEPARTMENT OF ENERGY IN THE MATTER: UNITED STATES DEPARTMENT OF ENERGY MONTICELLO (UTAH) SITE: MONTICELLO VICINITY PROPERTIES NPL SITE and MONTICELLO MILLSITE Federal Facility Agreement pursuant to Section 120 of the Comprehensive Environmental Response, Compensation, and ) FEDERAL FACILITY ) AGREEMENT PURSUANT TO

494

Advance Funding and Development Agreement: Plains & Eastern Clean Line  

Broader source: Energy.gov (indexed) [DOE]

Advance Funding and Development Agreement: Plains & Eastern Clean Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) More Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) EIS-0486: Notice of Intent and Notice of Potential Floodplain and Wetland

495

United States and International Partners Initial ITER Agreement |  

Broader source: Energy.gov (indexed) [DOE]

International Partners Initial ITER Agreement International Partners Initial ITER Agreement United States and International Partners Initial ITER Agreement May 24, 2006 - 10:48am Addthis Paves the Way for Large-Scale, Clean Fusion Energy Project BRUSSELS, BELGIUM - Representing the United States, Dr. Raymond L. Orbach, Director of the U.S. Department of Energy's (DOE) Office of Science, joined counterparts from China, the European Union, India, Japan, the Republic of Korea, and the Russian Federation today to initial an agreement to construct ITER, an international fusion energy project. Fusion energy is an important component of President Bush's Advanced Energy Initiative (AEI), given fusion's potential to become an attractive long-range option for the U.S. clean energy portfolio. In FY 2006, DOE allocated $25

496

United States and Italy Sign Nuclear Energy Agreements | Department of  

Broader source: Energy.gov (indexed) [DOE]

United States and Italy Sign Nuclear Energy Agreements United States and Italy Sign Nuclear Energy Agreements United States and Italy Sign Nuclear Energy Agreements September 30, 2009 - 1:23pm Addthis U.S. Secretary of Energy Steven Chu and Italian Minister for Economic Development Claudio Scajola today signed two important nuclear energy agreements that may lead to construction of new nuclear power plants and improved cooperation on advanced nuclear energy systems and fuel cycle technologies in both countries. The U.S.-Italy Joint Declaration Concerning Industrial and Commercial Cooperation in the Nuclear Energy Sector, which was signed on behalf of the United States by Secretary Chu and Deputy Secretary of Commerce Dennis F. Hightower, affirms the strong interest of the United States and Italy to encourage their respective nuclear industries to seek opportunities for the

497

DOE Announces International Agreement on Global Science Online Gateway |  

Broader source: Energy.gov (indexed) [DOE]

Announces International Agreement on Global Science Online Announces International Agreement on Global Science Online Gateway DOE Announces International Agreement on Global Science Online Gateway June 12, 2008 - 1:30pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the establishment of a multilateral alliance to govern the rapidly growing online gateway to international scientific research information--WorldWideScience.org. Officials from organizations representing 38 countries formalized their commitment today in Seoul, Korea, by signing a WorldWideScience Alliance agreement to sustain and build upon joint efforts to provide a single, sophisticated point of access for diverse scientific resources and expertise from nations around the world. "WorldWideScience.org is already a wonderful tool for communication,

498

Global Science Gateway Agreement Signed in London | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Science Gateway Agreement Signed in London Science Gateway Agreement Signed in London Global Science Gateway Agreement Signed in London January 22, 2006 - 10:15am Addthis DOE Partners With British Library on "Science.world" Initiative LONDON, ENGLAND -- Dr. Raymond L. Orbach, Under Secretary for Science of the U.S. Department of Energy (DOE), yesterday signed an agreement with Lynne Brindley, Chief Executive, the British Library, to partner on the development of a global science gateway. The gateway would eventually make science information resources of many nations accessible via a single Internet portal. "It is timely to make the science offerings of all nations searchable through one global gateway," Dr. Orbach said. "Science is international, and centralizing access will enhance the rate of scientific discovery. It

499

DOE Awards Cooperative Agreement for Innovative Electric Generation  

Broader source: Energy.gov (indexed) [DOE]

Awards Cooperative Agreement for Innovative Electric Generation Awards Cooperative Agreement for Innovative Electric Generation Facility with Pre-Combustion CO2 Capture and Storage DOE Awards Cooperative Agreement for Innovative Electric Generation Facility with Pre-Combustion CO2 Capture and Storage March 12, 2010 - 12:00pm Addthis Washington, D.C. -- The U.S. Department of Energy (DOE) has awarded a cooperative agreement to Summit Texas Clean Energy LLC (STCE) for the Texas Clean Energy Project to design, build, and demonstrate an integrated gasification combined cycle electric generating facility, complete with co-production of high-value products and carbon capture and storage. The project was a third round selection under DOE's Clean Coal Power Initiative, a cost-shared collaboration between the Federal Government and

500

Federal Facility Agreement for the Paducah Gaseous Diffusion Plant Summary  

Broader source: Energy.gov (indexed) [DOE]

Federal Facility Agreement for the Paducah Gaseous Federal Facility Agreement for the Paducah Gaseous Diffusion Plant State Kentucky Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA/RCRA Scope Summary Ensure that the environmental impacts of activities at the Site are investigated and appropriate response actions are taken. Parties U.S. DOE; Kentucky Natural Resources and Environmental Protection Cabinet; U.S. EPA Date 2/01/1998 SCOPE * Ensure all releases of hazardous substances, pollutants, or contaminants are addressed to achieve comprehensive remediation of the site. * Establish a procedural framework and schedule for developing, implementing, and monitoring response actions in accordance with CERCLA, RCRA, and Kentucky Law. * Facilitate cooperation, exchange of information, and participation of the Parties and