1

Fourth RFI Comment on Regulatory Review  

Energy.gov (U.S. Department of Energy (DOE))

As part of its implementation of Executive Order 13563, ‘‘Improving Regulation and Regulatory Review,’’ issued by the President on January 18, 2011, the Department of Energy (Department or DOE) is...

2

EEI Comments in response to DOE regulatory review RFI, 76 Fed...  

NLE Websites -- All DOE Office Websites (Extended Search)

in response to DOE regulatory review RFI, 76 Fed. Reg. 75798 (Dec. 5, 2011) The Edison Electric Institute (EEI) is submitting these comments in response to request for...

3

Fourth RFI_Comment on Regulatory Review.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

47328 47328 Vol. 77, No. 153 Wednesday, August 8, 2012 DEPARTMENT OF ENERGY 5 CFR Chapter XXII 10 CFR Chapters II, III, X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Request for information. SUMMARY: As part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' issued by the President on January 18, 2011, the Department of Energy (Department or DOE) is seeking comments and information from interested parties to assist DOE in reviewing its existing regulations to determine whether any such regulations should be modified, streamlined, expanded, or repealed. The purpose of DOE's review is to make the agency's regulatory program more effective and less burdensome in achieving its

4

Edison Electric Institute (EEI) Reducing Regulatory Burden RFI, 77 Fed.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Edison Electric Institute (EEI) Reducing Regulatory Burden RFI, 77 Edison Electric Institute (EEI) Reducing Regulatory Burden RFI, 77 Fed. Reg. 28518 (May 15, 2012) Edison Electric Institute (EEI) Reducing Regulatory Burden RFI, 77 Fed. Reg. 28518 (May 15, 2012) The Edison Electric Institute (EEI) is submitting these comments in response to the above-referenced request for information (RFI) issued by the Department of Energy (DOE). In the RFI, DOE is again asking for information on ways to streamline and to reduce the burden imposed by its regulations. Reg review - DOE RFI - EEI cmts 5-29-12.pdf More Documents & Publications Reducing Regulatory Burden RFI, 77 Fed. Reg. 28518 Edison Electric Institute (EEI) Regulatory Burden RFI, 77 Fed. Reg. 47328 EEI Comments in response to DOE regulatory review RFI, 76 Fed. Reg. 75798

5

AHAM Comments Regulatory Burden RFI  

Energy.gov (U.S. Department of Energy (DOE))

The Association of Home Appliance Manufacturers (AHAM) respectfully submits the following comments to the Department of Energy (DOE) on its Regulatory Burden RFI, 77 Fed. Reg. 47328 (Aug. 8, 2012).

6

Regulatory Burden RFI | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regulatory Burden RFI Regulatory Burden RFI These comments are submitted by the Air-Conditioning, Heating and Refrigeration Institute (AHRI) in response to the U.S. Department of...

7

Regulatory Burden RFI - Hussmann Corporation Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regulatory Burden RFI - Hussmann Corporation Response Regulatory Burden RFI - Hussmann Corporation Response January 3, 2012 Below are the list of questions with answers from the December 5 RFI: (1) How can the Department best promote meaningful periodic reviews of its existing rules and how can it best identify those rules that might be modified, streamlined, expanded, or repealed? DOE should maintain a list of all manufacturers impacted by legislation/rules and make sure these manufacturers are notified of all rule changes. A full review cycle should be done periodically and provide adequate time for ALL manufacturers to respond. (2) What factors should the agency consider in selecting and prioritizing rules and reporting requirements for review? Cost (initial and maintenance) should be considered as well as return on investment. Also,

8

Edison Electric Institute (EEI) Regulatory Burden RFI, 77 Fed. Reg. 47328 |  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Burden RFI, 77 Fed. Reg. Regulatory Burden RFI, 77 Fed. Reg. 47328 Edison Electric Institute (EEI) Regulatory Burden RFI, 77 Fed. Reg. 47328 The Edison Electric Institute (EEI) is submitting these comments in response to the above-referenced request for information (RFI). In the RFI, the Department of Energy (DOE) is asking for comments on ways to streamline its regulations and to eliminate unnecessary ones, so as to make the regulations less burdensome and more effective. Reg review - DOE RFI - EEI cmts 9-7-12.pdf More Documents & Publications Reducing Regulatory Burden RFI, 77 Fed. Reg. 28518 Edison Electric Institute (EEI) Reducing Regulatory Burden RFI, 77 Fed. Reg. 28518 (May 15, 2012) Edison Electric Institute (EEI) Reducing Regulatory Burden RFI, 76 Fed. Reg. 75798 (Dec. 5, 2011)

9

Edison Electric Institute (EEI) Reducing Regulatory Burden RFI...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Edison Electric Institute (EEI) Reducing Regulatory Burden RFI, 76 Fed. Reg. 75798 (Dec. 5, 2011) Edison Electric Institute (EEI) Reducing Regulatory Burden RFI, 76 Fed. Reg. 75798...

10

Edison Electric Institute (EEI) Reducing Regulatory Burden RFI...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reducing Regulatory Burden RFI, 77 Fed. Reg. 28518 (May 15, 2012) Edison Electric Institute (EEI) Reducing Regulatory Burden RFI, 77 Fed. Reg. 28518 (May 15, 2012) The Edison...

11

EEI Comments in response to DOE regulatory review RFI, 76 Fed. Reg. 75798 (Dec. 5, 2011)  

Energy.gov (U.S. Department of Energy (DOE))

The Edison Electric Institute (EEI) is submitting these comments in response to request for information (RFI) issued by the Department of Energy (DOE). In the RFI, DOE is asking for information on...

12

Reducing Regulatory Burden RFI, 77 Fed. Reg. 28518 | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

Burden RFI, 77 Fed. Reg. 28518 Reducing Regulatory Burden RFI, 77 Fed. Reg. 28518 The Edison Electric Institute (EEI) is submitting these comments in response to the...

13

NAESCO Comments on Reducing Regulatory Burden RFI Final | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on Reducing Regulatory Burden RFI Final The National Association of Energy Service Companies (NAESCO) appreciates the opportunity to submit these comments in response to the...

14

Microsoft Word - AGA Comments on 2011 Regulatory Burden RFI  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 15. 2011 April 15. 2011 U.S. Department of Energy Mr. Daniel Cohen Assistant General Counsel for Legislation, Regulation and Energy Efficiency Office of the General Counsel 1000 Independence Avenue, SW Washington, DC 20585 Via Email: Regulatory.Review@hq.doe.gov Subject: Reducing Regulatory Burden, Request for Information, Federal Register Vol. 76, No. 23, February 3, 2011 Dear Mr. Cohen: The American Gas Association (AGA) appreciates the opportunity to respond to the subject Department of Energy ("the Department") Request for Information (RFI) seeking comment and information to assist it in reviewing its existing regulations to determine whether such regulations should be modified or repealed pursuant to Executive Order 13563 ("Improving

15

Regulatory Burden RFI from AHRI | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AHRI Regulatory Burden RFI from AHRI These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of...

16

Regulatory Burden RFI, 77 Fed. Reg. 28518 (May 15, 2012)  

Energy.gov (U.S. Department of Energy (DOE))

The Association of Home Appliance Manufacturers (AHAM) respectfully submits the following comments to the Department of Energy (DOE) on its Regulatory Burden RFI, 77 Fed. Reg. 28518 (May 15, 2012).

17

Reducing Regulatory Burden EO 13563 Third RFI  

Energy.gov (U.S. Department of Energy (DOE))

As part of its implementation of Executive Order 13563, ‘‘Improving Regulation and Regulatory Review,’’ issued by the President on January 18, 2011, the Department of Energy (Department or DOE) is...

18

Regulatory Burden RFI Executive Order 13563  

Energy.gov (U.S. Department of Energy (DOE))

The situation we described last year (see below) has not improved.  We are waiting for additional rules from DOE but don’t believe they’ll provide the needed relief from regulatory burden.  This...

19

Reg review - DOE RFI - EEI cmts 2-3-12.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 3, 2012 February 3, 2012 U.S. Department of Energy Office of the General Counsel, Room 6A245 1000 Independence Avenue, SW Washington, DC 20585 Submitted via e-mail to: Regulatory.Review@hq.doe.gov Re: Reducing Regulatory Burden RFI, 76 Fed. Reg. 75798 (Dec. 5, 2011) Dear DOE staff: The Edison Electric Institute (EEI) is submitting these comments in response to the above-referenced request for information (RFI) issued by the Department of Energy (DOE). In the RFI, DOE is asking for information on ways to streamline and to reduce the burden imposed by its regulations. I. EEI Has a Direct Interest in This Proceeding EEI is the association of shareholder-owned electric utilities in the United States, international affiliates, and industry associates worldwide. Our U.S. members serve 95

20

Reg review - DOE RFI - EEI cmts 5-29-12.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29, 2012 29, 2012 U.S. Department of Energy Office of the General Counsel, Room 6A245 1000 Independence Avenue, SW Washington, DC 20585 Submitted via e-mail to: Regulatory.Review@hq.doe.gov Re: Reducing Regulatory Burden RFI, 77 Fed. Reg. 28518 (May 15, 2012) Dear DOE staff: The Edison Electric Institute (EEI) is submitting these comments in response to the above-referenced request for information (RFI) issued by the Department of Energy (DOE). In the RFI, DOE is again asking for information on ways to streamline and to reduce the burden imposed by its regulations. Though DOE has just granted an extension of the comment deadline in today's Federal Register from today to June 19, 2012, we are filing these comments now so DOE can have the benefit of our views.

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Reg review - DOE RFI - EEI cmts 9-7-12.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2012 7, 2012 U.S. Department of Energy Office of the General Counsel, Room 6A245 1000 Independence Avenue, SW Washington, DC 20585 Submitted via e-mail to: Regulatory.Review@hq.doe.gov Re: Regulatory Burden RFI, 77 Fed. Reg. 47328 (Aug. 8, 2012) Dear DOE staff: The Edison Electric Institute (EEI) is submitting these comments in response to the above-referenced request for information (RFI). In the RFI, the Department of Energy (DOE) is asking for comments on ways to streamline its regulations and to eliminate unnecessary ones, so as to make the regulations less burdensome and more effective. EEI already has filed the attached two sets of comments earlier this year offering such recommendations, to which DOE has not yet responded. We wish to reiterate them.

22

Regulatory Reduction RFI, 76 Fed. Reg. 6123, February 3, 2011 | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Reduction RFI, 76 Fed. Reg. 6123, February 3, 2011 Regulatory Reduction RFI, 76 Fed. Reg. 6123, February 3, 2011 Regulatory Reduction RFI, 76 Fed. Reg. 6123, February 3, 2011 This is in reply to comments filed by the Hearth, Patio & Barbecue Association (HPBA) urging the U.S. Department of Energy (DOE) to repeal its energy conservation standards for direct heating equipment as applied to decorative vented gas fireplaces. I support HPBA's comments because I do not believe that decorative vented gas fireplaces were ever meant to be included under the term "direct heating equipment" as that term appears in the Energy Policy and Conservation Act (EPCA). Regulatory Reduction RFI, 76 Fed. Reg. 6123, February 3, 2011 More Documents & Publications .Hearth, Patio & Barbecue Association's Comments on DOE's Regulatory Burden

23

Reducing Regulatory Burden EO 13563 Third RFI Comment Extension  

Energy.gov (U.S. Department of Energy (DOE))

This notice announces that the period for submitting comments on the Department of Energy’s (DOE) request for information (RFI) issued as part of its implementation of Executive Order 13563, ‘...

24

Microsoft Word - NAESCO Comments on Reducing Regulatory Burden RFI, Final.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

________________________________________________________ ________________________________________________________ 1615 M Street, NW, Suite 800 Tel 202/822-0950 Washington, DC 20036 Fax 202/822-0955 http://www.naesco.org May 29, 2012 U.S. Department of Energy Office of the General Counsel 1000 Independence Avenue SW., Room 6A245 Washington, DC 20585 Re: Regulatory Burden RFI Dear Sir or Madam: The National Association of Energy Service Companies (NAESCO) appreciates the opportunity to submit these comments in response to the Request for Information (RFI) entitled, "Reducing Regulatory Burden," published in the Federal Register on May 15, 2012.

25

DOE Reg. Burden RFI  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 4, 2012 January 4, 2012 Page 1 January 4, 2012 Daniel Cohen, Esq. Office of General Counsel U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Re: Regulatory Burden RFI Dear Mr. Cohen: These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice in the December 5, 2011 Federal Register requesting information to assist DOE in reviewing existing regulations and in making its regulatory program more effective and less burdensome. AHRI had submitted comments on March 21, 2011 in response to the previous Request for Information (RFI) issued by DOE in February of 2011. We appreciate DOE's commitment to maintaining a plan for regular, periodic review of its existing regulations and reporting

26

Edison Electric Institute (EEI) Reducing Regulatory Burden RFI, 77 Fed. Reg. 28518 (May 15, 2012)  

Energy.gov (U.S. Department of Energy (DOE))

The Edison Electric Institute (EEI) is submitting these comments in response to the above-referenced request for information (RFI) issued by the Department of Energy (DOE). In the RFI, DOE is again...

27

Edison Electric Institute (EEI) Reducing Regulatory Burden RFI, 76 Fed. Reg. 75798 (Dec. 5, 2011)  

Energy.gov (U.S. Department of Energy (DOE))

The Edison Electric Institute (EEI) is submitting these comments in response to the above-referenced request for information (RFI) issued by the Department of Energy (DOE).

28

Regulatory Burden RFI: Revitalization of DOE's Role as a Regulatory Watchdog  

Energy.gov (U.S. Department of Energy (DOE))

This Memorandum serves as an Executive Summary of Center for Regulatory Effectiveness’ (CRE’s) attached comments highlighting four issues:

29

Restrospective Regulatory Review  

Energy.gov (U.S. Department of Energy (DOE))

On January 18, 2011, President Obama issued Executive Order 13563, Improving Regulation and Regulatory Review, which directs federal agencies, among other things, to review existing regulations and...

30

DOE Reg. Burden RFI  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 21, 2011 March 21, 2011 Page 1 March 21, 2011 Daniel Cohen, Esq. Office of General Counsel U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Re: Regulatory Burden RFI Dear Mr. Cohen: These comments are submitted by the Air-Conditioning, Heating and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice appearing in the Federal Register on February 3, 2011 requesting information to assist DOE in reviewing existing regulations and in making its regulatory program more effective and less burdensome. AHRI is the trade association representing manufacturers of heating, cooling, water heating, and commercial refrigeration equipment. More than 300 members strong, AHRI is an internationally recognized advocate for the industry, and develops standards for and certifies the performance of

31

Microsoft Word - Cover Letter Regulatory Burden RFI 4-15-11  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

aimed at reducing unnecessary regulatory burdens, promoting economic growth and job creation, and minimizing the impacts of government actions on small businesses, today's...

32

DOE Com Reg Burden RFI 9-7-12.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 7, 2012 September 7, 2012 Page 1 September 7, 2012 Daniel Cohen, Esq. Office of General Counsel U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Re: Regulatory Burden RFI Dear Mr. Cohen: These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice in the August 8, 2012 Federal Register requesting information to assist DOE in reviewing existing regulations and in making its regulatory program more effective and less burdensome. AHRI most recently submitted comments on January 4, 2012 in response to the previous Request for Information (RFI) issued by DOE in December of 2011. We note that the May 2012 Retrospective Review Plan Report does include several items addressing issues noted in our

33

Office of Enforcement - Regulatory Assistance Reviews  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Assistance Reviews Regulatory Assistance Reviews Office of Enforcement and Oversight (formerly Program Reviews) Enforcement Regulatory Assistance Reviews evaluate contractor programs for identifying, evaluating, reporting and correcting noncompliances. The objective of these reviews is to work collaboratively with sites to identify areas where program effectiveness can be improved and ensure that noncompliances are being proactively self-identified. 2013 Office of Security Enforcement Regulatory Assistance Review of Battelle at the Pacific Northwest National Laboratory, July 18, 2013 Office of Worker Safety and Health Enforcement Regulatory Assistance Review of L ATA Environmental Services of Kentucky, LLC at the Paducah Gaseous Diffusion Plant, February 11, 2013 Office of Security Enforcement Regulatory Assistance Review of

34

Improving Regulation and Regulatory Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alton Strategic Environmental Group Alton Strategic Environmental Group New Port Richey, FL charles.alton@earthlink.net April 4, 2011 Daniel Cohen, Assistant General Counsel Legislation, Regulation, and Energy Efficiency Office of the General Counsel U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Dear Mr. Cohen: I have reviewed the Request For Information regarding Reducing Regulatory Reform issued

35

Galvin Electricity Initiative DOE RFI DOE RFI 2010-23251: Addressing...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Galvin Electricity Initiative DOE RFI DOE RFI 2010-23251: Addressing Policy and Logistical Challenges to Smart Grid Implementation Galvin Electricity Initiative DOE RFI DOE RFI...

36

DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled...  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled...

37

DOE Comments Regulatory Burden RFI  

Energy.gov (U.S. Department of Energy (DOE))

These comments are submitted by Rheem Manufacturing Company in response to the U.S. Department of Energy’s (DOE) notice appearing in the December 5, 2011 Federal Register requesting information on...

38

DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled  

NLE Websites -- All DOE Office Websites (Extended Search)

RFI 2010-11129 NBP RFI: Communications Requirements Titled RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" Grid Net, Inc. Comments on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy"

39

Regulatory Review and International Comparison  

E-Print Network (OSTI)

in a liberalised electricity market by developing a costs/benefit analysis of different regulatory designs Méditerranéen de l'Energie (OME), France For further information: Martin J.J. Scheepers Energy research Centre by the European Commission, Directorate-General for Energy and Transport, under the Energy Intelligent Europe (EIE

40

Regulatory incentives and prudence reviews  

Science Conference Proceedings (OSTI)

During the past several years, numerous large prudence case disallowances have occurred throughout the United States. Many of these cases concerned the construction of large nuclear facilities. Disallowances occurred despite the presence of incentive mechanisms that were used by various state public utility commissions. The regulatory model used during that period assumed that incentives were useful. Incentives were often viewed, however, as an exploratory exercise that might provide benefits. Still, the real mechanism used to protect ratepayers was the classical prudence case. And, as we saw during the 1980s, such cases were frequently used to prohibit utilities from passing unreasonable costs on to ratepayers. To avoid the system breakdowns and the resulting prudence cases, utilities and regulators must develop incentives that affect utilities' behavior to provide an optimal level of safe and adequate service at the lowest reasonable cost. If the incentives are simply viewed as an exotic regulatory mechanism, without being properly understood and implemented from an operational perspective at the utilities, they may not produce the desired outcome. In some instances they may be irrelevant to the final result. Several relatively new incentive mechanisms are promising. These include incentives that provide utilities with increased profits for implementing good customer-service programs or for achieving good performance in demand-side management (DSM) programs. Those incentives usually link a monetary reward or penalty in the form of a change to the earned rate of return to specific actions, such as the customer complaint rate for the utility or its success in installing certain DSM devices. These are promising because they relate to discrete events that can be easily understood by utility management and measured by regulators.

Bronner, K.M.

1993-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

NBP RFI: Data Access | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Access NBP RFI: Data Access Neustar, Inc. ("Neustar") hereby submits comments in response to the captioned Request for Information ("RFI") of the Department of Energy ("DOE"). The...

42

CRE_Response-DOE_Regulatory_Review_Request_for_Comments.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Center for Regulatory Effectiveness Center for Regulatory Effectiveness 1601 Connecticut Avenue, N.W. Washington, DC, 20009 Tel: (202) 265-2383 Fax: (202) 939-6969 secretary1@mbsdc.com www.TheCRE.com 1 REGULATORY REVIEW MEMORANDUM To: Department of Energy From: Jim Tozzi Subject: Regulatory Burden Request for Information Date: September 4, 2012 CC: Boris Bershteyn/Office of Information and Regulatory Affairs This Memorandum serves as an Executive Summary of Center for Regulatory Effectiveness' (CRE's) attached comments highlighting four issues: 1. DOE's Regulatory Coordination & Harmonization Responsibilities; 2. The Cumulative Costs of Regulations; 3. Retrospective Review of Regulations; and 4. Stakeholder Participation. DOE REGULATORY COORDINATION & HARMONIZATION RESPONSIBILITIES

43

FINAL-west-doe-rfi-comments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October October 31, 2013 Mr. Christopher Lawrence Office of Electricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Submitted electronically via email to: Christopher.Lawrence@hq.doe.gov Re: Department of Energy - Improving Performance of Federal Permitting and Review of Infrastructure Projects, Request for Information, 78 Fed. Reg. 53436 (Aug. 29, 2013) Dear Mr. Lawrence: I. INTRODUCTION Western Energy Supply and Transmission Associates ("WEST") 1 respectfully submits these comments in response to the questions raised in the above-referenced Department of Energy (DOE) Request for Information (RFI). This RFI addresses the proposed pre-application process for siting of transmission projects requiring interagency

44

Maryland-National Capital Building Industry Association Regulatory...  

NLE Websites -- All DOE Office Websites (Extended Search)

Maryland-National Capital Building Industry Association Regulatory Burden RFI (Federal Register August 8, 2012) Maryland-National Capital Building Industry Association Regulatory...

45

Regulatory Review of Early Site Permit Applications  

Science Conference Proceedings (OSTI)

The U.S. Nuclear Regulatory Commission (NRC) has received and is reviewing three applications for early site permits (ESPs). The ESP process allows early resolution of site-related issues affecting possible construction and operation of a new nuclear power plant. The nuclear industry views a successful and predictable ESP process as an important step in assessing whether to seek authorization to construct and operate a new generation of nuclear power reactors in the United States. Because consideration of ESP applications is a first-of-a-kind activity, a number of issues have emerged prior to and during the reviews of the first three applications. Issues have included the need for design information at the ESP stage, accident analyses, quality assurance, and seismic analyses. The NRC has been working to resolve identified issues to support a Commission decision on whether to issue an ESP approximately 33-37 months after receipt of each ESP application. (authors)

Scott, Michael L. [Senior Project Manager, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555 (United States)

2004-07-01T23:59:59.000Z

46

Galvin Electricity Initiative DOE RFI DOE RFI 2010-23251: Addressing Policy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Galvin Electricity Initiative DOE RFI DOE RFI 2010-23251: Galvin Electricity Initiative DOE RFI DOE RFI 2010-23251: Addressing Policy and Logistical Challenges to Smart Grid Implementation Galvin Electricity Initiative DOE RFI DOE RFI 2010-23251: Addressing Policy and Logistical Challenges to Smart Grid Implementation The Galvin Electricity Initiative, a non-profit organization, has dedicated its resources to researching and developing both prototypes and policy reforms that demonstrate the art of the possible in terms of grid performance. Galvin Electricity Initiative DOE RFI DOE RFI 2010-23251: Addressing Policy and Logistical Challenges to Smart Grid Implementation More Documents & Publications ABB Response to Smart Grid RFI. November 1, 2010 Comments of Santiago Grijalva: High-Level Response to DOE RFI on Smart Grid

47

RFI Comments - NRC  

Science Conference Proceedings (OSTI)

... security regulations for operating reactors and combined ... regulatory requirements and reactor oversight by ... requirements for a nuclear power plant ...

2013-04-09T23:59:59.000Z

48

Comments on RFI on Permitting of Transmission Lines Available | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments on RFI on Permitting of Transmission Lines Available Comments on RFI on Permitting of Transmission Lines Available Comments on RFI on Permitting of Transmission Lines Available April 3, 2012 - 2:12pm Addthis On October 5, 2011, the White House announced the creation of a Rapid Response Team for Transmission (RRTT). In support of the RRTT the Department of Energy's Office of Electricity Delivery and Energy Reliability released a Federal Register Notice seeking information on questions related to permitting of transmission lines. The Request for Information focused on making the development times for generation and transmission more commensurate with one another. Public comments received from the following organizations are now available for review and downloading. - Allegheny Highlands Alliance - American Electric Power

49

RFI Comments - ISA  

Science Conference Proceedings (OSTI)

... Level requirements for each Zone and Conduit ... Security Zones are a more comprehensive method ... factors including the regulatory climate, the level ...

2013-04-08T23:59:59.000Z

50

Microsoft Word - NAP Coalition Response to DOE RFI DRAFT 10.11.01.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NAP Coalition Response to DOE RFI NAP Coalition Response to DOE RFI Addressing Policy and Logistical Challenges to Smart Grid Implementation November 1, 2010 The NAP Coalition is a "Coalition of Coalitions" that has been formed for the purpose of implementing the National Action Plan released by FERC in cooperation with DOE in June of 2010. Organizations working together on NAP implementation in include EEI, APPA, NRECA, ASE, ACEEE, NASUCA, NARUC, NASEO, DRSG, DRCC and EDF. The NAP Coalition submits a response in this RFI only to question #14 in Section II of the RFI. 14. How should insights about consumer decision-making be incorporated into federal-state collaborative efforts such as the Federal Energy Regulatory Commission's (FERC) National Action Plan

51

DOE Review of Regulations- Center for Regulatory Effectiveness Comments  

Energy.gov (U.S. Department of Energy (DOE))

The Center for Regulatory Effectiveness (CRE) is pleased to submit these comments to the Department of Energy (DOE) on how DOE can best review its existing regulations and to identify whether any...

52

NBP RFI: Data Access Honeywell Responses To Request for Information (RFI)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NBP RFI: Data Access Honeywell Responses To Request for Information NBP RFI: Data Access Honeywell Responses To Request for Information (RFI) from the Department of Energy on Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy NBP RFI: Data Access Honeywell Responses To Request for Information (RFI) from the Department of Energy on Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy Comments from Honeywell on DOE Request for Information (RFI) from the Department of Energy on Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy NBP RFI: Data Access Honeywell Responses To Request for Information (RFI) from the Department of Energy on Implementing the National Broadband Plan

53

Comments of National Grid to the Smart Grid RFI | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Grid to the Smart Grid RFI Comments of National Grid to the Smart Grid RFI National Grid's Response to the Department of Energy Smart Grid RFI: Addressing Policy and...

54

RE: NBP RFI: Data Access | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RE: NBP RFI: Data Access RE: NBP RFI: Data Access Comments from Building Owners and Managers Association International on DOE Request for Information-Implementing the National...

55

RE: NBP RFI: Data Access | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RE: NBP RFI: Data Access RE: NBP RFI: Data Access Comments from Southern California Edison on DOE Request for Information-Implementing the National Broadband Plan by Empowering...

56

Re~ Request for Information NBP RFI: Data Access | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Information NBP RFI: Data Access Re Request for Information NBP RFI: Data Access Xcel Energy, a combination electricity and natural gas utility operating in eight Midwestern...

57

Request for Information NBP RFI: Data Access | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Information NBP RFI: Data Access Request for Information NBP RFI: Data Access Xcel Energy, a combination electricity and natural gas utility operating in eight Midwestern...

58

NBP RFI: Communications Requirements- Comments of Meeker Cooperative...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NBP RFI: Communications Requirements- Comments of Meeker Cooperative Light and Power- Minnesota NBP RFI: Communications Requirements- Comments of Meeker Cooperative Light and...

59

Dairyland Power Cooperative Comments on Smart Grid RFI: Addressing...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments on Smart Grid RFI: Addressing Policy and Logistical Challenges Dairyland Power Cooperative Comments on Smart Grid RFI: Addressing Policy and Logistical Challenges...

60

Okaloosa Gas District Smart Grid RFI: Addressing Policy and Logistical...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Okaloosa Gas District Smart Grid RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation Okaloosa Gas District Smart Grid RFI: Addressing Policy and...

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges Southern Company:...

62

Steffes Corporation Smart Grid RFI: Addressing Policy and Logistical...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steffes Corporation Smart Grid RFI: Addressing Policy and Logistical Challenges Steffes Corporation Smart Grid RFI: Addressing Policy and Logistical Challenges Steffes Corporation...

63

NBP RFI: Communications Requirements- Honeywell Responses To...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information (RFI) from the Department of Energy on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal...

64

Request for Information (RFI) Manufacturing Technology ...  

Science Conference Proceedings (OSTI)

The National Institute of Standards and Technology (NIST) released a request for information (RFI) to interested parties to comment on NIST's ...

2013-08-06T23:59:59.000Z

65

NBP RFI: Data Access | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for approximately 11 percent of all electric energy sold in the United States. NBP RFI: Data Access More Documents & Publications Re: DOE Request for Information - Implementing the...

66

Microsoft Word - RFI_Response.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Concise, High-Level Response to DOE RFI on Smart Grid Policy Santiago Grijalva, Ph.D. Associate Professor Director, Advanced Computational Electricity Systems (ACES) Laboratory...

67

RFI Announced for Fiber Reinforced Polymer Composite ...  

Science Conference Proceedings (OSTI)

Aug 25, 2013... information on research and development (R&D) needs, market challenges, ... high speed, low cost, energy efficient manufacturing processes and strategies ... The purpose of this Request for Information (RFI) is to solicit feedback ... Any information obtained as a result of this RFI is intended to be used by ...

68

Microsoft Word - Qualcomm Comments on DOE NBP RFI v.2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DC 20585 DC 20585 In the Matter of National Broadband Plan (NBP) RFI: Communications Requirements COMMENTS OF QUALCOMM INCORPORATED Dean R. Brenner Vice President, Government Affairs John W. Kuzin Senior Director, Regulatory 1730 Pennsylvania Avenue, NW Suite 850 Washington, DC 20006 (202) 263-0020 Dated: July 12, 2010 SUMMARY Qualcomm is pleased to provide these detailed comments to the Department of Energy ("DOE" or "Department") on how current and future wireless broadband communications capabilities can support the energy management needs of electric utilities, businesses, and consumers, which include requirements for the evolving and growing Smart Grid. The DOE should be applauded for timely following-up on the recommendations in the Federal

69

NBP RFI: Data Access Honeywell Responses To Request for Information (RFI)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Access Honeywell Responses To Request for Information Access Honeywell Responses To Request for Information (RFI) from the Department of Energy on Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy NBP RFI: Data Access Honeywell Responses To Request for Information (RFI) from the Department of Energy on Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy Comments from Honeywell on DOE Request for Information (RFI) from the Department of Energy on Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy NBP RFI: Data Access Honeywell Responses To Request for Information (RFI) from the Department of Energy on Implementing the National Broadband Plan

70

Microsoft Word - DOE RFI - NBP RFI Communications Requirements.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Donahue Ferry Road P.O. Box 5000 Pineville, LA 71361-5000 www.cleco.com Tel. 318-484-7400 July 12, 2010 U. S. Department of Energy Office of the General Counsel 1000 Independence Ave, SW, Room 6A245 Washington, DC 20585 Subject: NBP RFI: Communications Requirements Introduction Cleco Corporation greatly appreciates the opportunity to provide information to the Department of Energy (DOE) on the communications needs of utilities. Cleco is an energy services company based in central Louisiana, serving approximately 276,000 residential, commercial and industrial customers since 1934. Cleco manages over 3,000 megawatts of electric capacity through its regulated Cleco Power LLC and unregulated Cleco Midstream Resources LLC businesses, utilizing a diverse fuel mix of lignite, coal, petcoke and natural gas. With 1,300 employees, Cleco manages and operates 70 transmission

71

RFI - US-China Clean Energy Research Center | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RFI - US-China Clean Energy Research Center RFI - US-China Clean Energy Research Center RFI - US-China Clean Energy Research Center RFI - US-China Clean Energy Research Center More...

72

Worker Safety and Health Regulatory Assistance Reviews | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Worker Safety Worker Safety and Health Regulatory Assistance Reviews Worker Safety and Health Regulatory Assistance Reviews Documents Available for Download July 17, 2001 Preliminary Notice of Violation, Kaiser-Hill Company, LLC - EA-2001-04 Preliminary Notice of Violation issued to Kaiser-Hill Company, LLC, related to Nuclear Safety, Work Control, and Radiation Protection Deficiencies at the Rocky Flats Environmental Technology Site March 19, 2000 Preliminary Notice of Violation, Kaiser-Hill Company, LLC - EA-2000-05 Preliminary Notice of Violation issued to Kaiser-Hill Company, LLC, related to an Unplanned, Radioactive Material Uptake at the Rocky Flats Environmental Technology Site, (EA-2000-05) September 21, 1998 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA

73

Security Enforcement Regulatory Assistance Reviews | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Security Security Enforcement Regulatory Assistance Reviews Security Enforcement Regulatory Assistance Reviews Documents Available for Download May 4, 2012 Enforcement Letter, CH2M Oak Ridge, LLC - SEL-2012-01 Issued to URS CH2M Oak Ridge, LLC, related to a Security Incident involving the Protection and Control of Classified Information at the East Tennessee Technology Park April 18, 2011 Preliminary Notice, Battelle Energy Alliance, LLC, SEA-2011-01 Issued to Battelle Energy Alliance, LLC related to Classified Information Introduced into Unapproved Information Systems at the Idaho National Laboratory March 24, 2011 Settlement Agreement, Sandia Corporation - SSA-2011-01 Settlement Agreement between DOE/NNSA and Sandia Corporation for Adverse Classified Information Security Trend at Sandia National Laboratories

74

NBP RFI: Data Access | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Access NBP RFI: Data Access Reply comments from Cleco Power LLC on DOE Request for Information-Implementing the National Broadband Plan by Empowering Customers and the Smart Grid:...

75

Microsoft Word - MHI Comments to DOE-Regulatory Review 5-29-2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

111 Wilson Blvd. Suite 100 Arlington, VA 22201 Tel: 703.558.0400 Fax: 703.558.0401 111 Wilson Blvd. Suite 100 Arlington, VA 22201 Tel: 703.558.0400 Fax: 703.558.0401 http://www.manufacturedhousing.org info@mfghome.org U.S. Department of Energy Office of Energy Efficiency and Renewable Energy, Building Technologies Program Mailstop EE-2J 1000 Independence Avenue, S.W. Washington, DC 20585-1585 May 29, 2012 Reference: Regulatory Burden RFI Dear Sir or Madam: On behalf of the Manufactured Housing Institute (MHI) I am pleased to respond to the Department of Energy's (DOE's) May 15, 2012 request for comments and information regarding regulations that should be modified, streamlined, expanded, or repealed as a part of its implementation of Executive Order

76

Dairyland Power Cooperative Comments on Smart Grid RFI: Addressing Policy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments on Smart Grid RFI: Addressing Comments on Smart Grid RFI: Addressing Policy and Logistical Challenges Dairyland Power Cooperative Comments on Smart Grid RFI: Addressing Policy and Logistical Challenges Dairyland Power Cooperative is a generation and transmission cooperative (G&T) that provides the wholesale electrical requirements and other services for 25 electric distribution cooperatives and 16 municipal utilities in the Upper Midwest. Smart Grid RFI: Addressing Policy and Logistical Challenges More Documents & Publications AARP, National Consumer Law Center, and Public Citizen Comments to:DEPARTMENT OF ENERGY Smart Grid RFI: Addressing Policy and Logistical Challenges Florida Power and Light Comments on Smart Grid Request For Information (RFI): Addressing Policy & Logistical Challenges.

77

NBP RFI: Communications Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NBP RFI: Communications Requirements NBP RFI: Communications Requirements NBP RFI: Communications Requirements Cleco Corporation greatly appreciates the opportunity to provide information to the Department of Energy (DOE) on the communications needs of utilities. Cleco is an energy services company based in central Louisiana, serving approximately 276,000 residential, commercial and industrial customers since 1934. Cleco manages over 3,000 megawatts of electric capacity through its regulated Cleco Power LLC and unregulated Cleco Midstream Resources LLC businesses, utilizing a diverse fuel mix of lignite, coal, petcoke and natural gas. With 1,300 employees, Cleco manages and operates 70 transmission substations connected via 1,300 miles of transmission lines, together feeding over 350 distribution substations,

78

NBP RFI: Data Access | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NBP RFI: Data Access NBP RFI: Data Access NBP RFI: Data Access The National Rural Electric Cooperative Association (NRECA) is the national service organization representing more than 900 not-for-profit, member-owned rural electric cooperatives ("Cooperatives"). Most of NRECA's members are distribution cooperatives, providing retail electric service to more than 42 million consumers in 47 states. NRECA members also include approximately 66 generation and transmission ("G&T") cooperatives that supply wholesale power to their distribution cooperative member-owners. Cooperatives provide service to approximately 75 percent of the nation's land mass, resulting in a consumer density of just seven consumers per mile of line, significantly less density than that of

79

Quadrant III RFI draft report: Volume 1  

SciTech Connect

The purpose of the RCRA Facility Investigation (RFI) at The Portsmouth Gaseous Diffusion Plant (PORTS) is to acquire, analyze and interpret data that will: characterize the environmental setting, including ground water, surface water and sediment, soil and air; define and characterize sources of contamination; characterize the vertical and horizontal extent and degree of contamination of the environment; assess the risk to human health and the environment resulting from possible exposure to contaminants; and support the Corrective Measures Study (CMS), which will follow the RFI, if required. A total of 18 Solid Waste Management Units (SWMU`s) were investigated. All surficial soil samples (0--2 ft), sediment samples and surface-water samples proposed in the approved Quadrant III RFI Work Plan were collected as specified in the approved work plan and RFI Sampling Plan. All soil, sediment and surface-water samples were analyzed for parameters specified from the Target Compound List and Target Analyte List (TCL/TAL) as listed in the US EPA Statement of Work for Inorganic (7/88a) and Organic (2/88b) analyses for Soil and Sediment, and analyses for fluoride, Freon-113 and radiological parameters (total uranium, gross alpha, gross beta and technetium).

Not Available

1992-12-01T23:59:59.000Z

80

Quadrant III RFI draft report: Volume 1  

SciTech Connect

The purpose of the RCRA Facility Investigation (RFI) at The Portsmouth Gaseous Diffusion Plant (PORTS) is to acquire, analyze and interpret data that will: characterize the environmental setting, including ground water, surface water and sediment, soil and air; define and characterize sources of contamination; characterize the vertical and horizontal extent and degree of contamination of the environment; assess the risk to human health and the environment resulting from possible exposure to contaminants; and support the Corrective Measures Study (CMS), which will follow the RFI, if required. A total of 18 Solid Waste Management Units (SWMU's) were investigated. All surficial soil samples (0--2 ft), sediment samples and surface-water samples proposed in the approved Quadrant III RFI Work Plan were collected as specified in the approved work plan and RFI Sampling Plan. All soil, sediment and surface-water samples were analyzed for parameters specified from the Target Compound List and Target Analyte List (TCL/TAL) as listed in the US EPA Statement of Work for Inorganic (7/88a) and Organic (2/88b) analyses for Soil and Sediment, and analyses for fluoride, Freon-113 and radiological parameters (total uranium, gross alpha, gross beta and technetium).

Not Available

1992-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Comments from The National Association of Regulatory Utility Commissioners  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

from The National Association of Regulatory Utility from The National Association of Regulatory Utility Commissioners (NARUC) on the Smart Grid RFI Comments from The National Association of Regulatory Utility Commissioners (NARUC) on the Smart Grid RFI The National Association of Regulatory Utility Commissioners (NARUC) appreciates the opportunity to provide comments to the Department of Energy (DOE) on this Request for Information (RFI) regarding the policy and logistical challenges of the smart grid. The National Association of Regulatory Utility Commissioners (NARUC). More Documents & Publications RE: NBP RFI: Data Access In the Matter of Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid; Data Access, Third Party Use, and Privacy, 75 Federal Register 33611 (June 14, 2010).

82

Microsoft Word - Honeywell comments_DOE RFI_Smart Grid Policy and Logistical Challenges.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE RFI on Smart Grid DOE RFI on Smart Grid Honeywell Inc. 1 INITIAL COMMENTS OF HONEYWELL, INC. ON POLICY AND LOGISTICAL CHALLENGES IN IMPLEMENTING SMART GRID SOLUTIONS Pursuant to DOE's September 17, 2010 request, Honeywell, Inc. ("Honeywell") respectfully submits these comments on policy and logistical challenges and potential solutions for implementing Smart Grid solutions. Honeywell appreciates the opportunity to comment on regulatory policy issues that need to be considered, and on implementation challenges and opportunities critical to deploying Smart Grid systems. We base our views on Honeywell's market-leading position and over 100 years of experience in providing energy management solutions. Nearly 50% of our product portfolio delivers energy efficiency benefits. Honeywell Automation

83

UNITED STATES OF AMERICA DEPARTMENT OF ENERGY Smart Grid RFI: Addressing Policy and Logistical Challenges  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Smart Grid RFI: Addressing Policy and Logistical Challenges The National Association of Regulatory Utility Commissioners (NARUC) appreciates the opportunity to provide comments to the Department of Energy (DOE) on this Request for Information (RFI) regarding the policy and logistical challenges of the smart grid. 75 Fed. Reg. 57006 (Sept. 17, 2010). INTRODUCTION NARUC is the national organization of State commissions responsible for economic and safety regulation of utilities. Our members in the fifty States, the District of Columbia, Puerto Rico, and the Virgin Islands have the obligation under State law to ensure the establishment and maintenance of such energy utility services as may be required by the public convenience and

84

Smart Grid RFI Public Comments and Replies | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Smart Grid RFI Public Comments and Replies Smart Grid RFI Public Comments and Replies Smart Grid RFI Public Comments and Replies As part of its ongoing effort to assist in the formation of policies that will govern the integration of broadband technologies with the Smart Grid, the DOE General Counsel's office issued two Requests for Information (RFIs) in May of 2010. The first RFI was issued to solicit comments from electric utilities, consumer groups, and other stakeholders on ongoing federal, state, and private efforts to protect consumer energy usage data. The second RFI was issued to assist the Department in studying the present and future communications needs of electric utilities as Smart Grid technologies are deployed more broadly across the country. Smart Grid RFI Press Release (May 11, 2010)

85

Re: NBP RFI: Data Access | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Re: NBP RFI: Data Access Re: NBP RFI: Data Access Re: NBP RFI: Data Access The Consumer Electronics Association ("CEA") respectfully submits this response to the Department of Energy's ("DOE") Request for Information on Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy ("RFI").1 CEA is the principal U.S. trade association of the consumer electronics and information technology industries. CEA's approximately 2,000 member companies include leading manufacturers and providers of consumer- and utility-facing smart grid products and services. Re: NBP RFI: Data Access More Documents & Publications Addressing Policy and Logistical Challenges to smart grid Implementation: eMeter Response to Department of Energy RFI

86

NAP Coalition Response to DOE RFI: Addressing Policy and Logistical  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NAP Coalition Response to DOE RFI: Addressing Policy and Logistical NAP Coalition Response to DOE RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation NAP Coalition Response to DOE RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation The NAP Coalition is a "Coalition of Coalitions" that has been formed for the purpose of implementing the National Action Plan released by FERC in cooperation with DOE in June of 2010. Organizations working together on NAP implementation in include EEI, APPA, NRECA, ASE, ACEEE, NASUCA, NARUC, NASEO, DRSG, DRCC and EDF. The NAP Coalition submits a response in this RFI only to question #14 in Section II of the RFI. NAP Coalition Response to DOE RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation More Documents & Publications

87

Grid Net, Inc. Comments to DOE RFI 2010-11129  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Net, Inc. Comments to DOE RFI 2010-11129 2010 Net, Inc. Comments to DOE RFI 2010-11129 2010 DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled "Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy" Submitted by Grid Net, Inc. July 12, 2010 Attention: Maureen C. McLaughlin, Senior Legal Advisor to the General Counsel Grid Net, Inc. Comments to DOE RFI 2010-11129 2010 Summary and Highlights Thank you for the opportunity to provide comments for the Department of Energy RFI 2010-11129, our detailed responses to your questions are below for your consideration. The key points we'd like to get

88

NAP Coalition Response to DOE RFI: Addressing Policy and Logistical  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NAP Coalition Response to DOE RFI: Addressing Policy and Logistical NAP Coalition Response to DOE RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation NAP Coalition Response to DOE RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation The NAP Coalition is a "Coalition of Coalitions" that has been formed for the purpose of implementing the National Action Plan released by FERC in cooperation with DOE in June of 2010. Organizations working together on NAP implementation in include EEI, APPA, NRECA, ASE, ACEEE, NASUCA, NARUC, NASEO, DRSG, DRCC and EDF. The NAP Coalition submits a response in this RFI only to question #14 in Section II of the RFI. NAP Coalition Response to DOE RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation More Documents & Publications

89

NBP RFI: Data Access Honeywell Responses To Request for Information...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy NBP RFI: Data Access Honeywell Responses To...

90

NBP_RFI_Data_Access.PDF | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NBPRFIDataAccess.PDF NBPRFIDataAccess.PDF NBPRFIDataAccess.PDF More Documents & Publications Silver Spring Networks comments on DOE NBP RFI: Data Access...

91

Re: NBP RFI: Communications Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NBP RFI: Communications Requirements NBP RFI: Communications Requirements Re: NBP RFI: Communications Requirements CTIA - The Wireless AssociationÂź ("CTIA")1 submits this response to the Department of Energy's ("DOE") Request for Information ("RFI") regarding the communications requirements of utilities pursuant to the National Broadband Plan.2 Wireless communications are a critical component of "Smart Grids" and commercial wireless networks can readily satisfy the communications requirements of Smart Grid applications. As CTIA explains below, (1) commercial wireless solutions are already meeting communications needs to implement the Smart Grid with both utility network and consumer applications; (2) commercial wireless networks" ubiquity, security and reliability support the operational requirements of Smart Grid

92

Pensacola Smart Grid RFI Addressing Policy and Logistical Challenges...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Logistical Challenges. Providing comment on: Consumer facing programs such as feedback, demand response, energy efficiency, and automation strategies. Pensacola Smart Grid RFI...

93

RE: NBP RFI: Communication Requirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements RE: NBP RFI: Communication Requirements Comments of Southern California Edison on Implementing the National Broadband Plan by Studying the Communications...

94

Re: Comments on NBP RFI: Data Access | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

OF ENERGY Smart Grid RFI: Addressing Policy and Logistical Challenges The Need for Essential Consumer Protections: Smart Metering Proposals and the Move to Time-Based Pricing...

95

NBP RFI: Communications Requirements- Comments of Meeker Cooperative...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meeker Cooperative Light and Power- Minnesota NBP RFI: Communications Requirements- Comments of Meeker Cooperative Light and Power- Minnesota Comments of Meeker Cooperative Light...

96

NBP RFI: Communications Requirements- Comments of Lake Region...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lake Region Electric Cooperative- Minnesota NBP RFI: Communications Requirements- Comments of Lake Region Electric Cooperative- Minnesota Comments of Lake Region Electric...

97

Re: NBP RFI: Communications Requirements- Implementing the National...  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: NBP RFI: Communications Requirements- Implementing the National...

98

Smart Grid RFI: Addressing Policy and Logistical Challenges....  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Challenges. Comments of the Alliance to Save Energy. Smart Grid RFI: Addressing Policy and Logistical Challenges. Comments of the Alliance to Save Energy. The Alliance to Save...

99

Smart Grid RFI: Addressing Policy and Logistical Challenges,...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Challenges, Comments from the Edison Electric Institute Smart Grid RFI: Addressing Policy and Logistical Challenges, Comments from the Edison Electric Institute The Edison Electric...

100

Responses by CPower, Inc. to DOE RFI  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

by CPower, Inc. to DOE RFI by CPower, Inc. to DOE RFI July12th, 2010 Orientation: CPower is one of the world's largest providers of demand-side management services to end-users in the United States and beyond. We believe we are the largest non- utility aggregator of short-notice demand response (under ten-minutes) in the world, and we provide short-notice demand response services in the broadest possible array of geographies (in every available region of the United States, and in Ontario, the United Kingdom, and beyond). 1. Who owns energy consumption data? CPower believes that an individual owns his/her individual consumption data. Others may in some cases have a right to use that data, in the event that they are either

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Microsoft Word - RFI_Response.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Concise, High-Level Response to Concise, High-Level Response to DOE RFI on Smart Grid Policy Santiago Grijalva, Ph.D. Associate Professor Director, Advanced Computational Electricity Systems (ACES) Laboratory School of Electrical and Computer Engineering Georgia Institute of Technology November 1, 2010 Abstract This document responds to DOE questions regarding smart grid policy. The approach followed herein is to write concise comments addressing the overall RFI document at a higher level. This is necessary because: a) Smart grid is a "systems" problem, where individual technologies are rather irrelevant. b) Most of the ongoing concerns and immediate policy issues of interest to DOE are related to the architecture of the power grid and of the electricity industry, not to isolated technologies or to specific

102

AHAM Comments_DOE Reg Review Sept 2012_FINAL.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 7, 2012 September 7, 2012 By E-Mail Daniel Cohen Assistant General Counsel for Legislation, Regulation, and Energy Efficiency U.S. Department of Energy Office of the General Counsel 1000 Independence Ave., SW Washington, D.C. 20585 Regulatory.Review@hq.doe.gov Re: Regulatory Burden RFI Dear Mr. Cohen: The Association of Home Appliance Manufacturers (AHAM) respectfully submits the following comments to the Department of Energy (DOE) on its Regulatory Burden RFI, 77 Fed. Reg. 47328 (Aug. 8, 2012). AHAM represents manufacturers of major, portable and floor care home appliances, and suppliers to the industry. AHAM's more than 150 members employ tens of thousands of people in the U.S. and produce more than 95% of the household appliances shipped for sale within the

103

Pepco Holdings, Inc. Smart Grid RFI: Addressing Policy and Logistical  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Holdings, Inc. Smart Grid RFI: Addressing Policy and Holdings, Inc. Smart Grid RFI: Addressing Policy and Logistical Challenges Pepco Holdings, Inc. Smart Grid RFI: Addressing Policy and Logistical Challenges Pepco Holdings, Inc. Smart Grid RFI: Addressing Policy and Logistical Challenges. Pepco Holdings, Inc. (PHI) is pleased to respond to the US Department of Energy (DOE) request for information regarding addressing policy and logistical challenges to smart grid implementation. This follows on the heels of PHI's responses to two other DOE RFls on data access and communications requirements. Pepco Holdings, Inc. Smart Grid RFI: Addressing Policy and Logistical Challenges More Documents & Publications DC OPC Comments. September 17, 2010 Addressing Policy and Logistical Challenges to smart grid Implementation:

104

Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Southern Company: DOE Smart Grid RFI Addressing Policy and Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges. Southern recognizes that many policy and logistical concerns must be addressed for the promises of smart grid technologies and applications to be fully realized in ways that are beneficial, secure, and cost-effective lor utility customers. Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges More Documents & Publications Re: DOE Request for Information - Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy

105

Microsoft Word - UTC Comments DOE RFI Data Access Privacy Final.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Before the Before the Department of Energy Washington, D.C. 20585 In the Matter of Implementing the National Broadband Plan by Empowering Consumers and The Smart Grid: Data Access, Third Party Use and Privacy ) ) ) ) NBP RFI: Data Access, Third Party Use and Privacy COMMENTS OF UTILITIES TELECOM COUNCIL Michael Oldak, Vice President & General Counsel Brett Kilbourne, Director of Regulatory Service & Associate Counsel Utilities Telecom Council 1901 Pennsylvania Avenue, NW Fifth Floor Washington, DC 20006 202-872-0030 July 12, 2010 TABLE OF CONTENTS Introduction .................................................................................................................................... 2 Questions....................................................................................................................................... 3

106

Smart Grid RFI: Addressing Policy and Logistical Challenges, Comments from  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RFI: Addressing Policy and Logistical Challenges, RFI: Addressing Policy and Logistical Challenges, Comments from the Edison Electric Institute Smart Grid RFI: Addressing Policy and Logistical Challenges, Comments from the Edison Electric Institute The Edison Electric Institute ("EEI"), on behalf of its member companies, hereby submits the following comments in response to the request by the Department of Energy ("DOE" or "Department") for information on a wide range of issues dealing with Smart Grid technology, applications, consumer interaction, policy initiatives and economic impacts, including the definition of Smart Grid; interactions with and implications for residential, commercial and industrial customers; Smart Grid costs and benefits; collaboration between utilities, device manufacturers and energy

107

RE: NBP RFI Reply Comments: Communications Requirements | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

RE: NBP RFI Reply Comments: Communications Requirements RE: NBP RFI Reply Comments: Communications Requirements RE: NBP RFI Reply Comments: Communications Requirements The National Rural Electric Cooperative Association and American Public Power Association file these brief reply comments in support of the comments and reply comments filed by the Utilities Telecom Council ("UTC"). Both organizations strongly believe that the Administration should ensure that adequate spectrum is available for internal, utility networks. Integrating Smart Grid technologies into Cooperative and Public Power Systems will necessitate enhanced communications networks. In some instances, Cooperatives and Public Power Systems may choose a commercial provider for at least some portion of their communication network service

108

Regulatory Burden RFI from Bodine Electric Company | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on unnecessarily burdensome regulations involving Energy Conservation Standards for Small Electric Vehicles. Bodine Electric Company Comment.PDF More Documents & Publications...

109

FINAL CA IOU Comment Letter RFI Regulatory Burden  

Energy.gov (U.S. Department of Energy (DOE))

This letter comprises the comments of the Pacific Gas and Electric Company (PG&E), Southern California Gas Company (SCGC), San Diego Gas and Electric (SDG&E), and Southern California Edison...

110

Okaloosa Gas District Smart Grid RFI: Addressing Policy and Logistical  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Okaloosa Gas District Smart Grid RFI: Addressing Policy and Okaloosa Gas District Smart Grid RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation Okaloosa Gas District Smart Grid RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation Okaloosa Gas District (The District) an Independent Special District of the State of Florida is appreciative of the opportunity to submit for your consideration the following comments in response to the U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability's Request for Information Addressing Policy and Logistical Challenges to Smart Grid Implementation, 75 Fed. Reg. 57,006 (Sep. 17, 2010). Okaloosa Gas District Smart Grid RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation More Documents & Publications

111

Responses by CPower, Inc. to DOE RFI | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Responses by CPower, Inc. to DOE RFI Responses by CPower, Inc. to DOE RFI Responses by CPower, Inc. to DOE RFI CPower is one of the world's largest providers of demand-side management services to end-users in the United States and beyond. We believe we are the largest non-utility aggregator of short-notice demand response (under ten-minutes) in the world, and we provide short-notice demand response services in the broadest possible array of geographies (in every available region of the United States, and in Ontario, the United Kingdom, and beyond). Responses by CPower, Inc. to DOE RFI More Documents & Publications Comments of the Demand Response and Smart Grid Coalition on DOE's Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy

112

DOE Announces RFI on Rare Earth Metals | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RFI on Rare Earth Metals RFI on Rare Earth Metals DOE Announces RFI on Rare Earth Metals May 6, 2010 - 12:00am Addthis Washington, D.C. - The Department of Energy has released a Request for Information (RFI) soliciting information on rare earth metals and other materials used in the energy sector. The request is specifically focused on rare earth metals (e.g., lanthanum, cerium and neodymium) and several other metals including lithium and cobalt, but respondents are welcome to identify other materials of interest. These materials are important to the development and deployment of a variety of clean energy technologies, such as wind turbines, hybrid vehicles, solar panels and energy efficient light bulbs. In a March 17 speech, Assistant Secretary of Energy for Policy & International Affairs David Sandalow announced that DOE is developing its

113

DOE Announces RFI on Rare Earth Metals | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RFI on Rare Earth Metals RFI on Rare Earth Metals DOE Announces RFI on Rare Earth Metals May 6, 2010 - 12:00am Addthis Washington, D.C. - The Department of Energy has released a Request for Information (RFI) soliciting information on rare earth metals and other materials used in the energy sector. The request is specifically focused on rare earth metals (e.g., lanthanum, cerium and neodymium) and several other metals including lithium and cobalt, but respondents are welcome to identify other materials of interest. These materials are important to the development and deployment of a variety of clean energy technologies, such as wind turbines, hybrid vehicles, solar panels and energy efficient light bulbs. In a March 17 speech, Assistant Secretary of Energy for Policy & International Affairs David Sandalow announced that DOE is developing its

114

Ambient Corporation's Reply comments to DOE RFI: Addressing Policy and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ambient Corporation's Reply comments to DOE RFI: Addressing Policy Ambient Corporation's Reply comments to DOE RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation Ambient Corporation's Reply comments to DOE RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation Ambient Corporation submits the following comments to the US Department of Energy (DOE) in hopes that their contribution can highlight and further the understanding of the DOE on the key role that integrated communications will play ineneabling utilities to deploy cost-effective long-term smart grid benefits. Ambient Corporation's Reply comments to DOE RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation More Documents & Publications Comments of Tendril Networks Inc Technical Standards Newsletter - September 2001

115

Smart Grid RFI: Addressing Policy and Logistical Challenges. Comments of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Grid RFI: Addressing Policy and Logistical Challenges. Smart Grid RFI: Addressing Policy and Logistical Challenges. Comments of the Alliance to Save Energy. Smart Grid RFI: Addressing Policy and Logistical Challenges. Comments of the Alliance to Save Energy. The Alliance to Save Energy is a coalition of prominent business, government, environmental, and consumer leaders who promote the efficient use of energy worldwide to benefit consumers, the environment, economy, and national security. The Alliance to Save Energy (the Alliance) thanks the Department of Energy for the opportunity to comment on broad issues of policy and logistical challenges faced in smart grid implementation. Smart Grid RFI: Addressing Policy and Logistical Challenges. Comments of the Alliance to Save Energy. More Documents & Publications

116

Re: NBP RFI: Data Access | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the topics of data access, third party usage and privacy as they relate to consumers energy usage information and the Smart Grid. Re: NBP RFI: Data Access More Documents &...

117

Re: NBP RFI: CommunicationRse quirements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RFI: CommunicationRse quirements Pepco Holdings, Inc. (PHI) is pleased to respond to the U.S Department of Energy request for comments regarding the communications requirements of...

118

Re: NBP RFI: Data Access | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Information on Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy ("RFI").1 CEA is the principal U.S....

119

Microsoft Word - DOE RFI.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ms. Patricia Hoffman Ms. Patricia Hoffman Assistant Secretary United States Department of Energy 1000 Independence Avenue, SW, Room 8H033 Washington, DC 20585 RE: Smart Grid RFI Dear Assistant Secretary Hoffman, Thank you for the opportunity to provide information to the Department of Energy Federal Register Doc. 2010-23251 filed September 16, 2010. With our recent acquisition of Ventyx, ABB is one of the few companies in the smart grid space that can approach the entire smart grid value chain, from distributed generation at the residential level to distribution automation and real-time conditioned based maintenance of asset health. Our response will draw on multiple areas of expertise, focusing on the technology side of our industry as well as market direction.

120

NBP RFI: Communications Requirements | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Cleco Corporation greatly appreciates the opportunity to provide Cleco Corporation greatly appreciates the opportunity to provide information to the Department of Energy (DOE) on the communications needs of utilities. Cleco is an energy services company based in central Louisiana, serving approximately 276,000 residential, commercial and industrial customers since 1934. Cleco manages over 3,000 megawatts of electric capacity through its regulated Cleco Power LLC and unregulated Cleco Midstream Resources LLC businesses, utilizing a diverse fuel mix of lignite, coal, petcoke and natural gas. With 1,300 employees, Cleco manages and operates 70 transmission substations connected via 1,300 miles of transmission lines, together feeding over 350 distribution substations, dispersed over approximately 7,000 square miles. NBP RFI: Communications Requirements

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Comments of Santiago Grijalva: High-Level Response to DOE RFI on Smart Grid  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Santiago Grijalva: High-Level Response to DOE RFI on Santiago Grijalva: High-Level Response to DOE RFI on Smart Grid Policy Comments of Santiago Grijalva: High-Level Response to DOE RFI on Smart Grid Policy High-Level Response to DOE RFI on Smart Grid Policy: This document responds to DOE questions regarding smart grid policy. The approach followed herein is to write concise comments addressing the overall RFI document at a higher level. High-Level Response to DOE RFI on Smart Grid Policy More Documents & Publications Initial Comments of Honeywell, Inc. on Policy and Logistical Challenges in Implementing Smart Grid Solutions Comments of DRSG to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges Re: NBP RFI-Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart

122

TekTrakker Information Systems, LLC-Amart Grad RFI: Addressign...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TekTrakker Information Systems, LLC-Amart Grad RFI: Addressign Policy and Logistical Challenges TekTrakker Information Systems, LLC-Amart Grad RFI: Addressign Policy and Logistical...

123

Re: NBP RFI-Implementing the National Broadband Plan by Empowering...  

NLE Websites -- All DOE Office Websites (Extended Search)

RFI-Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use and Privacy Re: NBP RFI-Implementing the National Broadband...

124

GridWise Alliance: Smart Grid RFI: Addressing Policy and Logistical...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GridWise Alliance: Smart Grid RFI: Addressing Policy and Logistical Challenges GridWise Alliance: Smart Grid RFI: Addressing Policy and Logistical Challenges The GridWise Alliance...

125

Regulatory Impact Review Implementation of Inter-American Tropical Tuna Commission Resolutions Adopted in  

E-Print Network (OSTI)

Regulatory Impact Review Implementation of Inter-American Tropical Tuna Commission Resolutions to implement the decisions of the IATTC. The Tuna Conventions Act (16 U.S.C. 951-961) authorizes the Secretary the Resolution on Tuna Conservation 2011-2013 (C-11-01), the Resolution Prohibiting Fishing on Data Buoys (C-11

126

Response to the NIST RFI for M-TAC PROGRAM University of ...  

Science Conference Proceedings (OSTI)

Page 1. Response to the NIST RFI for M-TAC PROGRAM University of Michigan ... University of Michigan Principal Contact: ...

2013-08-06T23:59:59.000Z

127

NBP RFI: Communications Requirements- Honeywell Responses To Request for  

NLE Websites -- All DOE Office Websites (Extended Search)

Honeywell Responses To Honeywell Responses To Request for Information (RFI) from the Department of Energy on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal Smart NBP RFI: Communications Requirements- Honeywell Responses To Request for Information (RFI) from the Department of Energy on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal Smart Honeywell is a world leader in automation and control solutions with decades of experience in energy management; today our energy efficiency products and services are found in over 150 million homes, over 10 million buildings and over 5,000 industrial facilities world-wide. We also have hundreds of utilities as our customers.

128

Microsoft Word - DOE RFI 2 _rv4_.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NBP RFI: Communications Requirements NBP RFI: Communications Requirements Honeywell Responses To Request for Information (RFI) from the Department of Energy on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities To Inform Federal Smart Grid Policy Honeywell is a world leader in automation and control solutions with decades of experience in energy management; today our energy efficiency products and services are found in over 150 million homes, over 10 million buildings and over 5,000 industrial facilities world-wide. We also have hundreds of utilities as our customers. As a leading supplier of smart controls and with the benefit of our expertise from our large installed base mentioned above, we respond to the DOE's questions

129

National Institute of Standards and Technology RFI  

Science Conference Proceedings (OSTI)

... map between control frameworks or to map regulatory or ... power distributors, natural gas, oil, etc.) must ... frameworks that can be mapped into security ...

2013-04-09T23:59:59.000Z

130

RedSeal Comments on "Smart Grid RFI: Addressing Policy and Logistical  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RedSeal Comments on "Smart Grid RFI: Addressing Policy and RedSeal Comments on "Smart Grid RFI: Addressing Policy and Logistical Challenges. RedSeal Comments on "Smart Grid RFI: Addressing Policy and Logistical Challenges. RedSeal Comments on "Smart Grid RFI: Addressing Policy and Logistical Challenges. RedSeal's core technology is the ability to understand the access control of the network as a whole - not simply the behavior of a single device. RedSeal analyzes the interactions of firewalls, routers and load balancers network wide to determine the traffic allowed between every two points. RedSeal Comments on "Smart Grid RFI: Addressing Policy and Logistical Challenges. More Documents & Publications Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges Association of Home Appliance Manufacturers Comments on Smart Grid RFI

131

US Nuclear Regulatory Commission Input to DOE Request for Information Smart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

US Nuclear Regulatory Commission Input to DOE Request for US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input. Comments relevant to the following two sections of the RFI: "Long Term Issues: Managing a Grid with High Penetration of New Technologies" and "Reliability and Cyber-Security," US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input More Documents & Publications Comments of DRSG to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges Reply Comments of Entergy Services, Inc. Progress Energy draft regarding Smart Grid RFI: Addressing Policy and

132

Comments of DRSG to DOE Smart Grid RFI: Addressing Policy and Logistical  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of DRSG to DOE Smart Grid RFI: Addressing Policy and of DRSG to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges Comments of DRSG to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges In light of the fact that smart grid deployments are moving forward with pace and at scale, DRSG advises the DOE against seeking to redefine the term "smart grid" as a semantic exercise, as such an effort would introduce delay, generate uncertainty, and likely prove counterproductive. DOE Smart Grid RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation More Documents & Publications Addressing Policy and Logistical Challenges to smart grid Implementation: eMeter Response to Department of Energy RFI Association of Home Appliance Manufacturers Comments on Smart Grid RFI

133

ABB Response to Smart Grid RFI. November 1, 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Response to Smart Grid RFI. November 1, 2010 Response to Smart Grid RFI. November 1, 2010 ABB Response to Smart Grid RFI. November 1, 2010 Thank you for the opportunity to provide information to the Department of Energy Federal Register Doc. 2010-23251 filed September 16, 2010. With our recent acquisition of Ventyx, ABB is one of the few companies in the smart grid space that can approach the entire smart grid value chain, from distributed generation at the residential level to distribution automation and real-time conditioned based maintenance of asset health. Our response will draw on multiple areas of expertise, focusing on the technology side of our industry as well as market direction. Smart Grid RFI. November 1, 2010 More Documents & Publications Galvin Electricity Initiative DOE RFI DOE RFI 2010-23251: Addressing Policy

134

Response to U. S. Department of Energy's NBP RFI: Data Access |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U. S. Department of Energy's NBP RFI: Data Access U. S. Department of Energy's NBP RFI: Data Access Response to U. S. Department of Energy's NBP RFI: Data Access The following is DTE Energy's response to the Department of Energy's (DOE) Request for Information on the subject of Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy, published in the Federal Register on 11 May 2010. Response to U. S. Department of Energy's NBP RFI: Data Access More Documents & Publications Re: NBP RFI-Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use and Privacy RE: NBP RFI: Data Access Re: Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third

135

NBP RFI: Data Access, Third Party Use and Privacy- Comments of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Access, Third Party Use and Privacy- Comments of Utilities Telecom Council NBP RFI: Data Access, Third Party Use and Privacy- Comments of Utilities Telecom Council The Utilities...

136

NBP RFI: Data Access, Third Party Use and Privacy- Comments of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Party Use and Privacy- Comments of Baltimore Gas & Electric Company NBP RFI: Data Access, Third Party Use and Privacy- Comments of Baltimore Gas & Electric Company...

137

DOE's AMO Releases Workshop "Save the Date" and New RFI on ...  

DOE's AMO Releases Workshop "Save the Date" and New RFI on Composite Manufacturing. December 11, 2013. The U.S. Department of Energy's (DOE) Advanced ...

138

Radio-Frequency Interference (RFI) From Extra-High- Voltage (EHV) Transmission Lines  

E-Print Network (OSTI)

The subject of radio-frequency interference (RFI) generated by high-voltage transmission lines has long been of both academic and commercial interest because of concerns about

Patrick C. Crane

2010-01-01T23:59:59.000Z

139

Re: NBP RFI-Implementing the National Broadband Plan by Studying...  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: NBP RFI-Implementing the National Broadband Plan by Studying the...

140

Smart Grid RFI: Addressing Policy and Logistical Challenges. Comments of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Challenges. Challenges. Comments of the Alliance to Save Energy. Smart Grid RFI: Addressing Policy and Logistical Challenges. Comments of the Alliance to Save Energy. The Alliance to Save Energy is a coalition of prominent business, government, environmental, and consumer leaders who promote the efficient use of energy worldwide to benefit consumers, the environment, economy, and national security. The Alliance to Save Energy (the Alliance) thanks the Department of Energy for the opportunity to comment on broad issues of policy and logistical challenges faced in smart grid implementation. Smart Grid RFI: Addressing Policy and Logistical Challenges. Comments of the Alliance to Save Energy. More Documents & Publications DC OPC Comments. September 17, 2010 Comments of the National Rural Electric Cooperative Association, Request

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Green Light New York Releases Living Lab RFI  

NLE Websites -- All DOE Office Websites (Extended Search)

Green Light New York Releases Living Lab RFI Green Light New York Releases Living Lab RFI January 2014 Green Light New York and Lawrence Berkeley National Laboratory have partnered to develop a pair of "Living Lab" demonstration projects that will deploy innovative lighting, daylighting and shading systems in working New York City office spaces. The team has secured the participation of two Fortune 100 companies, each of which have committed to using an individual floor of their flagship NYC buildings as test beds for high performance systems. The project will include significant monitoring and analysis of the systems for a minimum of one year. Based on data collected and lessons learned over the course of the project the team will develop educational resources for the broader design, construction and real estate sectors,

142

Microsoft Word - FINAL RFI 03-22-11  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Critical Materials Strategy - Critical Materials Strategy Request for Information (RFI) DATE: March 22, 2011 SUBJECT: Request for Information (RFI) DESCRIPTION: In December 2010, DOE issued its first Critical Materials Strategy (available at: http://www.energy.gov/news/documents/criticalmaterialsstrategy.pdf). The report found that several clean energy technologies-including wind turbines, electric vehicles, photovoltaic cells and fluorescent lighting-use materials at risk of supply disruptions in the short term. In the report, five rare earth metals (dysprosium, neodymium, terbium, europium and yttrium), as well as indium, were assessed as most critical in the short term. For this purpose, "criticality" is a measure that combines importance to the clean energy economy and risk of supply disruption.

143

Response to U. S. Department of Energy's NBP RFI: Data Access |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Response to U. S. Department of Energy's NBP RFI: Data Access Response to U. S. Department of Energy's NBP RFI: Data Access Response to U. S. Department of Energy's NBP RFI: Data Access The following is DTE Energy's response to the Department of Energy's (DOE) Request for Information on the subject of Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy, published in the Federal Register on 11 May 2010. Response to U. S. Department of Energy's NBP RFI: Data Access More Documents & Publications Re: DOE Request for Information - Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: NBP RFI-Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use and Privacy

144

TekTrakker Information Systems, LLC-Amart Grad RFI: Addressign Policy and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TekTrakker Information Systems, LLC-Amart Grad RFI: Addressign TekTrakker Information Systems, LLC-Amart Grad RFI: Addressign Policy and Logistical Challenges TekTrakker Information Systems, LLC-Amart Grad RFI: Addressign Policy and Logistical Challenges TekTrakker Information Systems, LLC-Amart Grad RFI: Addressign Policy and Logistical Challenges. Recommendations on how to share and compare failure experience between utilities for all devices in order to drive improvements in grid reliability, drive better and more durable choices of smart grid equipment, and provide common standards for discussions about reliability for all stakeholders. TekTrakker Information Systems, LLC-Amart Grad RFI: Addressign Policy and Logistical Challenges More Documents & Publications FAQ: Funding Opportunity Announcement-Smart Grid Investment Grants

145

DOE Announces Second RFI on Rare Earth Metals | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second RFI on Rare Earth Metals Second RFI on Rare Earth Metals DOE Announces Second RFI on Rare Earth Metals March 22, 2011 - 12:00am Addthis Washington, D.C. - The Department of Energy today released a Request for Information (RFI) soliciting information from the public on rare earth metals and other materials used in the energy sector. Responses to this RFI will inform an update to DOE's Critical Materials Strategy (pdf - 5.7mb ), released December 15, 2010, that assessed the use of rare earth metals and other materials important to the development and deployment of a variety of clean energy technologies, such as wind turbines, hybrid vehicles, solar panels and energy efficient light bulbs. The updated strategy, expected later this year, will include additional analysis of rapidly-changing market conditions. It will analyze the use

146

Maryland-National Capital Building Industry Association Regulatory Burden  

NLE Websites -- All DOE Office Websites (Extended Search)

Maryland-National Capital Building Industry Association Regulatory Maryland-National Capital Building Industry Association Regulatory Burden RFI (Federal Register August 8, 2012) Maryland-National Capital Building Industry Association Regulatory Burden RFI (Federal Register August 8, 2012) On behalf of the Maryland-National Capital Building Industry Association, I am providing the following comments and information in response to DOE's request. The Association represents residential builders, developers and associated professionals and service firms. Final Letter to DOE Regulatory Burden 9_7_2012.pdf More Documents & Publications National Association of Home Builders (NAHB) Ex Parte Memorandum Energy Storage Activities in the United States Electricity Grid. May 2011 Frederick County (Maryland) Department of Permits and Inspections (FCDPI

147

A LOFAR RFI detection pipeline and its first results  

E-Print Network (OSTI)

Radio astronomy is entering a new era with new and future radio observatories such as the Low Frequency Array and the Square Kilometer Array. We describe in detail an automated flagging pipeline and evaluate its performance. With only a fraction of the computational cost of correlation and its use of the previously introduced SumThreshold method, it is found to be both fast and unrivalled in its high accuracy. The LOFAR radio environment is analysed with the help of this pipeline. The high time and spectral resolution of LOFAR have resulted in an observatory where only a few percent of the data is lost due to RFI.

Offringa, A R; Zaroubi, S; Biehl, M

2010-01-01T23:59:59.000Z

148

GridWise Alliance: Smart Grid RFI: Addressing Policy and Logistical  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GridWise Alliance: Smart Grid RFI: Addressing Policy and Logistical GridWise Alliance: Smart Grid RFI: Addressing Policy and Logistical Challenges GridWise Alliance: Smart Grid RFI: Addressing Policy and Logistical Challenges The GridWise Alliance is a coalition of over 150 companies, organizations, and academic institutions advocating for a smart grid for a more sustainable future. We are consensus-driven and technology neutral and do not advocate for specific platforms or technologies, but, rather, for policies that will move the entire market forward to create jobs, provide clean energy solutions, and increase the reliability, flexibility, and efficiency of our electric grid. GridWise Alliance: Smart Grid RFI: Addressing Policy and Logistical Challenges More Documents & Publications WHAT A SMART GRID MEANS TO OUR NATION'S FUTURE.

149

DOE Extends Deadline for Submission of Smart Grid RFI Reply Comments |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Deadline for Submission of Smart Grid RFI Reply Deadline for Submission of Smart Grid RFI Reply Comments DOE Extends Deadline for Submission of Smart Grid RFI Reply Comments July 16, 2010 - 3:20pm Addthis Due to an unexpectedly large public response, the Department of Energy will extend by two weeks the deadline for submission of reply comments in response to its two Smart Grid RFIs. Originally set at July 26, the new deadline will be August 9, 2010. The Department's Smart Grid RFIs (both released in May 2010) were intended to inform the Department as it develops policies regarding the integration of broadband technologies with the Smart Grid. The first RFI solicited comments from electric utilities, consumer groups, and other stakeholders on ongoing federal, state, and private efforts to use or allow

150

NBP RFI-Addressing Policy and Logistical Challenges to Smart Grid  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NBP RFI-Addressing Policy and Logistical Challenges to Smart Grid NBP RFI-Addressing Policy and Logistical Challenges to Smart Grid Implementation. September 10, 2009 NBP RFI-Addressing Policy and Logistical Challenges to Smart Grid Implementation. September 10, 2009 The Telecommunications Industry Association (TIA) is pleased to provide comments on how to address the numerous challenges facing the development and deployment of smart grid technologies. Smart grid is a more robust application of information and communication technologies (ICT) to transform the generation, transmission, distribution and consumption of electricity to provide greater automation, increase reliability, improve efficiency and reduce energy consumption. NBP RFI-Addressing Policy and Logistical Challenges to Smart Grid Implementation. September 10, 2009

151

RE: NBP RFI: Data Access In the Matter of Implementing the National...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RE: NBP RFI: Data Access In the Matter of Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid; Data Access, Third Party Use, and Privacy, 75 Federal...

152

DRSG Comments to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges Comments to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges DRSG- 1 DOE Smart Grid RFI Titled "Addressing Policy and Logistical Challenges to Smart Grid Implementation" Submitted by the Demand Response and Smart Grid Coalition (DRSG) November 1, 2010 DRSG Comments to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges DRSG- 2 I. Definition and Scope 1. What significant policy challenges are likely to remain unaddressed if we employ Title XIII's definition? In light of the fact that smart grid deployments are moving forward with pace and at scale, DRSG advises the DOE against seeking to redefine the term "smart grid" as a semantic exercise, as such an effort would introduce delay, generate uncertainty, and likely prove

153

New York Independent System Operator, Smart Grid RFI: Addressing Policy and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

York Independent System Operator, Smart Grid RFI: Addressing York Independent System Operator, Smart Grid RFI: Addressing Policy and Logistical Challenges. New York Independent System Operator, Smart Grid RFI: Addressing Policy and Logistical Challenges. In response to the Department of Energy's (DOE) Request for Information regarding smart grid implementation listed in the September 17, 2010 Federal Register, the New York Independent System Operator, Inc. (NYISO) offers the attached white paper entitled Envisioning a Smarter Grid for New York Consumers. New York Independent System Operator, Smart Grid RFI: Addressing Policy and Logistical Challenges. More Documents & Publications Smart Grid Consortium, Response of New York State Smart Grid Addressing Policy and Logistical Challenges 2009 Smart Grid System Report (July 2009)

154

DOE Request for Information (RFI) DE-FOA-0000153 PV Manufacturing Initiative: Summary Report, February 2010  

DOE Green Energy (OSTI)

This document sums up results of the PV Manufacturing Request for Information (RFI), DE-FOA-0000153, which supports the PV Manufacturing Initiative, launched by DOE Solar Energy Technologies Program.

Not Available

2010-02-01T23:59:59.000Z

155

Microsoft Word - RedSeal_Smart Grid Policy Logistics RFI-sd.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on Smart Grid RFI RedSeal Systems, Inc. 1 October 29, 2010 Office of Electricity Delivery and Energy Reliability US Department of Energy Room 8H033 1000 Independence Avenue, SW...

156

Microsoft Word - DOE RFI Response 10-27-10  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

tektrakker.com 0 tektrakker.com 0 TekTrakker Information Systems, LLC Smart Grid RFI: Addressing Policy and Logistical Challenges Gay Gordon-Byrne President, TekTrakker Information Systems, LLC 5 Cranberry Court North Haledon, NJ 07508 Office: 973-949-5163 Mobile: 201-747-4022 gbyrne@tektrakker.com We are pleased to present our recommendations on how to share and compare failure experience between utilities for all devices in order to drive improvements in grid reliability, drive better and more durable choices of smart grid equipment, and provide common standards for discussions about reliability for all stakeholders. www.tektrakker.com 1 Table of Contents Executive Summary: .................................................................................................................................. 2

157

Microsoft Word - RRTT RFI - FINAL EEI Comments.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mr. Lamont Jackson Office of Electricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Submitted electronically via email to: Lamont.Jackson@hq.doe.gov Re: Department of Energy - Rapid Response Team for Transmission Request for Information, RRTT-IR-01, 77 Fed. Reg. 11517 (Feb. 27, 2012) Dear Mr. Jackson: I. INTRODUCTION The Edison Electric Institute (EEI) is pleased to provide these comments in response to the questions raised in the above-referenced Department of Energy (DOE) Request for Information (RFI) regarding Federal efforts to address the issue of "incongruent development timelines" for the siting and permitting of electricity generation and attendant transmission.

158

Program on Technology Innovation: Response to the Center for Nuclear Waste Regulatory Analyses Review of EPRI Reports on Igneous Pro cesses at Yucca Mountain  

Science Conference Proceedings (OSTI)

EPRI's 2004 and 2005 technical reports (1008169 and 1011165) describe what might occur in the unlikely event of extrusive or intrusive igneous events at Yucca Mountain repository. The Center for Nuclear Waste Regulatory Analyses (CNWRA) reviewed these two reports in 2007. EPRI has evaluated this review; this report discusses and clarifies several salient points that EPRI believes were misinterpreted in the CNWRA review.

2007-09-27T23:59:59.000Z

159

20120328 WEST Comments on RRTT RFI Response Request  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March March 2 8, 2 012 Mr. L amont J ackson Office o f E lectricity D elivery a nd E nergy R eliability ( OE---20) U.S. D epartment o f E nergy 1000 I ndependence A venue, S W Washington, D C 2 0585 Submitted e lectronically v ia d ocket ( Document I D D OE_FRDOC_0001---1840) a nd e mail t o: Lamont.Jackson@hq.doe.gov Re: Department o f E nergy --- R apid R esponse T eam f or T ransmission R equest for I nformation, R RTT---IR---01, 7 7 F ed. R eg. 1 1517 ( Feb. 2 7, 2 012) 1 Dear M r. J ackson: I. INTRODUCTION The W estern E nergy S upply a nd T ransmission A ssociates ( "WEST") 2 respectfully s ubmits t hese r esponses t o t he s pecific q uestions r aised i n t he Department o f E nergy's ( DOE) a bove---referenced R equest f or I nformation ( RFI) regarding F ederal e fforts t o r esolve t he i ssue o f i ncongruent

160

Integrated resource planning for local gas distribution companies: A critical review of regulatory policy issues  

SciTech Connect

According to the report, public utility commissions (PUCs) are increasingly adopting, or considering the adoption of integrated resource planning (IRP) for local gas distribution companies (LDCs). The Energy Policy Act of 1992 (EPAct) requires PUCs to consider IRP for gas LDCs. This study has two major objectives: (1) to help PUCs develop appropriate regulatory approaches with regard to IRP for gas LDCs; and (2) to help PUCs respond to the EPAct directive. The study finds that it is appropriate for PUCs to pursue energy efficiency within the traditional regulatory framework of minimizing private costs of energy production and delivery; and PUCs should play a limited role in addressing environmental externalities. The study also finds that in promoting energy efficiency, PUCs should pursue policies that are incentive-based, procompetitive, and sensitive to rate impacts. The study evaluates a number of traditional and nontraditional ratemaking mechanisms on the basis of cost minimization, energy efficiency, competitiveness, and other criteria. The mechanisms evaluated include direct recovery of DSM expenses, lost revenue adjustments for DSM options, revenue decoupling mechanisms, sharing of DSM cost savings, performance-based rate of return for DSM, provision of DSM as a separate service, deregulation of DSM service, price caps, and deregulation of the noncore gas market. The study concludes with general recommendations for regulatory approaches and ratemaking mechanisms that PUCs may wish to consider in advancing IRP objectives.

Harunuzzaman, M.; Islam, M.

1994-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 2. Evaluation of seismic designs: a review of seismic design requirements for Nuclear Power Plant Piping  

Science Conference Proceedings (OSTI)

This document reports the position and recommendations of the NRC Piping Review Committee, Task Group on Seismic Design. The Task Group considered overlapping conservation in the various steps of seismic design, the effects of using two levels of earthquake as a design criterion, and current industry practices. Issues such as damping values, spectra modification, multiple response spectra methods, nozzle and support design, design margins, inelastic piping response, and the use of snubbers are addressed. Effects of current regulatory requirements for piping design are evaluated, and recommendations for immediate licensing action, changes in existing requirements, and research programs are presented. Additional background information and suggestions given by consultants are also presented.

Not Available

1985-04-01T23:59:59.000Z

162

NBP RFI: Data Access, Third Party Use, and Privacy- Comments of Oncor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NBP RFI: Data Access, Third Party Use, and Privacy- Comments of NBP RFI: Data Access, Third Party Use, and Privacy- Comments of Oncor Electric Deliverty Company LLC NBP RFI: Data Access, Third Party Use, and Privacy- Comments of Oncor Electric Deliverty Company LLC Oncor Electric Delivery Company LLC (Oncor) is a regulated electric transmission and distribution utility that serves the north-central, eastern and western parts of Texas, including the cities of Dallas and Fort Worth. Oncor operates the largest electric transmission and distribution system in Texas, delivering power to over 3 million homes and businesses and operating approximately 117,000 miles of distribution and transmission lines in Texas. Oncor operates in a unique market in which only competitive Retail Electric Providers (REPs) who are not utilities sell electricity to

163

Re: NBP RFI-Implementing the National Broadband Plan by Studying the  

NLE Websites -- All DOE Office Websites (Extended Search)

Re: NBP RFI-Implementing the National Broadband Plan by Studying Re: NBP RFI-Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: NBP RFI-Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy The Telecommunications Industry Association (TIA) is pleased to provide comments on the communications requirements of electric utilities relevant to smart grid policy. TIA appreciates the proactive role the Department of Energy (DOE) is taking in executing the recommendations from the FCC in the National Broadband Plan. Electric utilities and the ICT industry share a long tradition of partnering to build and maintain the communications networks contributing to the security and reliability of the grid.

164

Microsoft Word - RedSeal_Smart Grid Policy Logistics RFI-sd.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on Smart Grid RFI on Smart Grid RFI RedSeal Systems, Inc. 1 October 29, 2010 Office of Electricity Delivery and Energy Reliability US Department of Energy Room 8H033 1000 Independence Avenue, SW Washington, DC 20585 Re: Comments on "Smart Grid RFI: Addressing Policy and Logistical Challenges" 75 FR 57006 [FR Doc. 2010-23251] From: Steve Dauber Vice-President, Marketing RedSeal Systems 2121 South El Camino Real, Suite 300 San Mateo, CA 94403 Ph: 650-645-6209 sdauber@redseal.net www.redseal.net RedSeal Systems is a leading developer of security posture management software for large organizations and has provided their software to several major utilities for complex network security applications. RedSeal software - in use by more than 150 industry and

165

Re: NBP RFI-Implementing the National Broadband Plan by Studying the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Re: NBP RFI-Implementing the National Broadband Plan by Studying Re: NBP RFI-Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: NBP RFI-Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy The Telecommunications Industry Association (TIA) is pleased to provide comments on the communications requirements of electric utilities relevant to smart grid policy. TIA appreciates the proactive role the Department of Energy (DOE) is taking in executing the recommendations from the FCC in the National Broadband Plan. Electric utilities and the ICT industry share a long tradition of partnering to build and maintain the communications networks contributing to the security and reliability of the grid.

166

Comments of Tendril Networks, Inc. on DOE Request for Information (RFI)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments of Tendril Networks, Inc. on DOE Request for Information Comments of Tendril Networks, Inc. on DOE Request for Information (RFI) from the Department of Energy on Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy Comments of Tendril Networks, Inc. on DOE Request for Information (RFI) from the Department of Energy on Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy Tendril is pleased to provide these comments to the Department of Energy in response to the Request for Information "Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy." Comments of Tendril Networks, Inc. on DOE Request for Information (RFI)

167

Re: NBP RFI: Communications Requirements- Comments of AT&T Inc. |  

NLE Websites -- All DOE Office Websites (Extended Search)

Comments of AT&T Inc. Comments of AT&T Inc. Re: NBP RFI: Communications Requirements- Comments of AT&T Inc. AT&T Inc., on behalf of itself and its affiliates ("AT&T"), respectfully submits these comments in response to the Department Of Energy"s Request for Information ("RFI") on the communications requirements of utilities. AT&T supports DOE"s efforts and coordination with various Federal, State and private initiatives to implement the Smart Grid. We appreciate the opportunity to inform federal Smart Grid policy by participating in DOE"s examination of the communications requirements of electric utilities deploying Smart Grid capabilities in their networks. Re: NBP RFI: Communications Requirements- Comments of AT&T Inc.

168

Microsoft Word - DOE RFI on Transmission Planning - PGE Comments.DOC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments of Pacific Gas & Electric Company Comments of Pacific Gas & Electric Company Department of Energy Request for Information on Transmission Permitting [OE Docket No. RRTT-IR-001] Pacific Gas & Electric Company (PG&E) appreciates the opportunity to respond to the questions from the Department of Energy (DOE) in its Request for Information (RFI) related to the permitting of transmission lines. The RFI lists six (6) questions, several of them with subparts. PG&E responds to the questions sequentially as they are listed in the RFI. As discussed in more detail below, increased alignment across the federal, state and local agencies for permitting and improved planning coordination would improve the development time for transmission and generation. Improved focus on planning would result in a more

169

Natural Gas Industry Comments on Smart Grid RFI: Addressing Policy and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Industry Comments on Smart Grid RFI: Addressing Policy Natural Gas Industry Comments on Smart Grid RFI: Addressing Policy and Logistical Challenges to Smart Grid Natural Gas Industry Comments on Smart Grid RFI: Addressing Policy and Logistical Challenges to Smart Grid The undersigned members of the natural gas industry are pleased to submit for your consideration the following comments in response to the U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability's Request for Information Addressing Policy and Logistical Challenges to Smart Grid Implementation, 75 Fed. Reg. 57,006 (Sep. 17, 2010). The Request seeks comment on challenges that confront smart grid implementation and recommendations on how best to overcome those challenges. We believe abundant, domestic, low-carbon natural gas resources along with

170

Microsoft Word - Southern_Draft_Response_to_DOE_RFI_7-9-2010 _clean_.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Before the Before the U.S. DEPARTMENT OF ENERGY Washington, DC 20585 In the Matter of Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy ) ) ) ) ) ) ) NBP RFI: Communications Requirements RESPONSE OF SOUTHERN COMPANY SERVICES, INC. Southern Company Services, Inc. ("Southern Company"), on behalf of itself and its operating affiliates, hereby submits its response to the Department of Energy's ("DOE's") Request for Information ("RFI"), released May 5, 2010, about current and projected communications requirements of electric utilities in "sustaining and

171

DOE Retrospective Review Plan and Burden Reduction Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 15, 2013 February 15, 2013 Agency/ Sub- agency RIN/ OMB Control Number Title of Initiative/ Rule/lCR Brief Description Actual or Target Completion Date Anticipated savings in costs and/or information collection burdens, together with any anticipated changes in benefits Progress updates and anticipated accomplish- ments Notes DOE/GC N/A Request for information on reducing regulatory burden DOE is continually engaging in review of its rules to determine whether there are burdens on the public that can be avoided by amending or rescinding existing requirements. To that end, while DOE is always open to receiving information about the impact of its regulations, it published this RFI to solicit public input. August 8, 2012 (77 FR 47328) This information solicitation is expected

172

Regulatory Reduction RFI, 76 Fed. Reg. 6123, February 3, 2011 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Empire Comfort Systems supported the law requiring energy efficiency Empire Comfort Systems supported the law requiring energy efficiency standards for Direct Heating Equipment (DHE), and when DOE started the rule making process to establish such standards we participated actively and in good faith .During the process we were visited by DOE's consultant Navigant and spent many hours entertaining DOE's consultants answering questions about our company and our products. There was follow-up and as far as I know full cooperation on our part to play within the rules. This process seemed to provide an opportunity to give data, exchange thoughts concerning our business and on the jobs we provide. Whether I liked the results regarding the space heating equipment or the heater rated hearth products is not relevant to this conversation. What is relevant is the idea that

173

Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory Burden RFI  

Energy.gov (U.S. Department of Energy (DOE))

These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy’s (DOE) notice in the August 8, 2012 Federal Register...

174

Supplement Analysis of Site-Specific and Programmatic Environmental Impact Statements: Operational and Engineering Modifications, Regulatory Review, and Socioeconomic Variation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DISCLAIMER DISCLAIMER This document has been approved for distribution to the public. All information classified by the Department of Energy Strategic Petroleum Reserve as Sensitive Unclassified Information has been removed from this document. DOE/SPR/EIS-0075-SA01 SUPPLEMENT ANALYSIS OF SITE-SPECIFIC AND PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENTS: OPERATIONAL AND ENGINEERING MODIFICATIONS, REGULATORY REVIEW, AND SOCIOECONOMIC VARIATION U.S. Department of Energy Strategic Petroleum Reserve 900 Commerce Road East New Orleans, Louisiana 70123 March 2004 Prepared for the U. S. Department of Energy Strategic Petroleum Reserve Project Management Office under Contract No. DE-AC96-93PO92207 DynMcDermott Petroleum Operations Company 850 South Clearview Parkway

175

A confirmatory research approach to the measurement of EMI/RFI in commercial nuclear power plants  

Science Conference Proceedings (OSTI)

The Oak Ridge National Laboratory (ORNL) is conducting confirmatory research on the measurement of electromagnetic/radio frequency interference (EMI/RFI) in nuclear power plants while it makes a good beginning, the currently available research data are not sufficient to characterize the EMI/RFI environment of the typical nuclear plant. Data collected over several weeks at each of several observation points are required to meet this need. To collect the required data, several approaches are examined, the most promising of which is the relatively new technology of application specific spectral receivers. While several spectral receiver designs have been described in the literature, none is well suited for nuclear power plant EMI/RFI surveys. This paper describes the development of two receivers specifically designed for nuclear power plant EMI/RFI surveys. One receiver surveys electric fields between 5 MHz and 8 GHz, while the other surveys magnetic fields between 305 Hz and 5 MHz. The results of field tests at TVA`s Bull Run Fossil Plant are reported.

Kercel, S.W.

1995-02-01T23:59:59.000Z

176

Methylmercury in fish: a review of residue levels, fish consumption and regulatory action in the United States  

SciTech Connect

The dangers associated with the consumption of large amounts of methylmercury in fish are well recognized, and there is some evidence to suggest that methylmercury may be the cause of subtle neurological impairments when ingested at even low to moderate levels, particularly the prenatal and early childhood periods. This concern has prompted a continuing assessment of the risk of methylmercury toxicity among fish consumers in the US as well as other countries. The toxicokinetics of methylmercury in humans are reviewed and used to estimate body burdens associated with toxic effects. To determine seafood consumption patterns among the continental US population the Food and Drug Administration (FDA) has analyzed data from a diary study commissioned by the Tuna Research Foundation. Mercury residue levels in domestic fish sampled by the FDA were used to determine the level of exposure to methylmercury. Until evidence is presented that substantially lowers the known body burden of methylmercury which causes toxicity, calculations indicate that the current 1.0 ppm regulatory level provides adequate protection for the average fish consumer, for young children, and for a significant number of consumers exceeding the acceptable daily intake. However, additional studies are being carried out in a continuing process to ensure that safe levels of prenatal exposure to mercury residues in fish are maintained.

Tollefson, L.; Cordle, F.

1986-09-01T23:59:59.000Z

177

Microsoft Word - EEI - DOE SG RFI 3 DRAFT _11 1 10_ CLEAN.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November November 1, 2010 U.S. Department of Energy Office of Electric Delivery and Energy Reliability ATTN: Smart Grid RFI: Addressing Policy and Logistical Challenges 1000 Independence Avenue, SW Room 8H033 Washington, DC 20585 RE: SMART GRID RFI: ADDRESSING POLICY AND LOGISTICAL CHALLENGES TO SMART GRID IMPLEMENTATION The Edison Electric Institute ("EEI"), on behalf of its member companies, hereby submits the following comments in response to the request by the Department of Energy ("DOE" or "Department") for information on a wide range of issues dealing with Smart Grid technology, applications, consumer interaction, policy initiatives and economic impacts, including the definition of Smart Grid; interactions with and implications for residential, commercial and industrial customers; Smart Grid costs and benefits; collaboration between

178

NBP RFI: Communications Requirements- Reply Comments of AT&T Inc. |  

NLE Websites -- All DOE Office Websites (Extended Search)

Requirements- Reply Comments of AT&T Inc. Requirements- Reply Comments of AT&T Inc. NBP RFI: Communications Requirements- Reply Comments of AT&T Inc. AT&T Inc., on behalf of itself and its affiliates ("AT&T"), respectfully submits these reply comments in response to the Department Of Energy"s Request for Information ("RFI") on the communications requirements of electric utilities in Smart Grid deployments.1 In its initial comments, AT&T highlighted the expanding demand for network connectivity and how utilities can benefit from leveraging new network technologies deployed by commercial communications operators to optimize the performance, scalability, security, reliability and cost effectiveness of their Smart Grid applications deployments. Commercial communications

179

Microsoft Word - Southern Reply Comment Draft 08-09-2010 re DOE NBP RFI Communications.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BEFORE THE BEFORE THE U.S. DEPARTMENT OF ENERGY WASHINGTON, D.C. 20585 In the Matter of ) ) Implementing the National Broadband ) NBP RFI: Communications Requirements Plan by Studying the Communications ) Requirements of Electric Utilities to ) Inform Federal Smart Grid Policy ) REPLY COMMENTS OF SOUTHERN COMPANY SERVICES, INC. Southern Company Services, Inc. ("Southern"), on behalf of itself and its operating affiliates, hereby submits its reply comments in response to the Department of Energy's ("DOE's") Request for Information ("RFI"), released May 5, 2010, about current and projected communications requirements of electric utilities. 1 Southern appreciates the opportunity to provide DOE with additional information and to respond to the initial comments submitted in

180

Response to U. S. Department of Energy's NBP RFI: Data Access  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Response to U. S. Department of Energy's NBP RFI: Data Access DTE Energy Distribution Operations, SmartCurrents Standards 12 July 2010 I. Introduction The following is DTE Energy's response to the Department of Energy's (DOE) Request for Information on the subject of Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy, published in the Federal Register on 11 May 2010. DTE Energy is one of the nation's largest diversified energy companies. Headquartered in Detroit, Michigan, DTE Energy is involved in the development and management of energy-related

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Microsoft Word - Rare Earth Update for RFI 110523final  

NLE Websites -- All DOE Office Websites (Extended Search)

J. Thijssen, LLC P: 206 229 6882 J. Thijssen, LLC P: 206 229 6882 4910 163 rd Ave NE Redmond, WA 98052 e: jant@jthijssen.com Solid Oxide Fuel Cells and Critical Materials: A Review of Implications J. Thijssen, LLC Report Number: R102 06 04D1 Date: May 10, 2011 Prepared for: National Energy Technology Laboratory, In Sub-Contract to Leonardo Technologies, Inc. Contract Number: DE-FE0004002 (Subcontract: S013-JTH-PPM4002 MOD 00) 2 Summary The US DOE has identified a number of materials that are both used by clean energy technologies and are at risk of supply disruptions in the short term. Several of these materials, especially the rare earth elements (REEs) yttrium, cerium, and lanthanum were identified by DOE as critical (USDOE 2010) and are crucial to the function and performance of solid oxide

182

A Survey of C-Band RFI in the Chesapeake Bay Region using WindSat Radiometry  

E-Print Network (OSTI)

equal to four times the mean spacing of the swath data obtained from WindSat. This grid spacing June 27, 2004 Contents 1 Introduction 2 2 WindSat 2 3 Analysis 2 Bradley Dept. of Electrical & Computer on the circumstances. This advance information on RFI distribution can be obtained from an analysis of radiometry from

Ellingson, Steven W.

183

From: Adams, Charlie To: Regulatory.Review Cc: Stern, Jim; Parker, Mike; Dana, Paul; Josh Greene; Frank Stanonik; Neil Rolph; Schuh, Darrell; Roy Smith; Dan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Adams, Charlie To: Regulatory.Review Cc: Stern, Jim; Parker, Mike; Dana, Paul; Josh Greene; Frank Stanonik; Neil Rolph; Schuh, Darrell; Roy Smith; Dan Snyder; Berning, Dave Subject: EO 13563 Preliminary Plan comments from A.O. Smith Corporation Date: Monday, August 01, 2011 2:59:51 PM A.O. Smith Corporation Response to Preliminary Plan for Retrospective Analysis of Existing Rules A.O. Smith Corporation is the largest manufacturer of residential and commercial water heating equipment in the United States. We have the following comments in response to the July 11, 2011, Notice of Availability in the Federal Register, in which DOE sought comments regarding its EO 13563 Preliminary Plan: · In general, we commend DOE's approach to review significant rules on an on-going basis in order

184

Microsoft Word - 10 0726 Letter re DOE NBP RFI on Data Access w resolution.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 26, 2010 July 26, 2010 Maureen C. McLaughlin VIA E-Mail: broadband@hq.doe.gov Senior Legal Advisor to the General Counsel Office of the General Counsel 1000 Independence Avenue, SW., Room 6A245 Washington, DC 20585. RE: NBP RFI: Data Access In the Matter of Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid; Data Access, Third Party Use, and Privacy, 75 Federal Register 33611 (June 14, 2010). Dear Ms. McLaughlin: On May 11, 2010, the Department of Energy (DOE) published a Request for Information seeking comments from interested parties to assist DOE in understanding current and potential practices and policies for States and other entities to empower consumers (and perhaps others)

185

Microsoft Word - eMeter 10-11-01 Response to DOE RFI.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Addressing Policy and Logistical Challenges to smart grid Implementation: Addressing Policy and Logistical Challenges to smart grid Implementation: Response to Department of Energy RFI November 1, 2010 eMeter Strategic Consulting Background eMeter is a smart grid software company that provides smart network application platform (SNAP) software to integrate smart meters and smart grid communications networks and devices with utility IT systems. eMeter also provides smart grid application software such as meter data management (MDM) and consumer engagement software. Being vendor-neutral toward all meter, hardware, and legacy utility software systems (e.g. CIS and Billing), eMeter has a unique, unbiased and global perspective on smart grid IT issues. In addition, eMeter's principals have participated in the definition and development of the

186

Microsoft Word - TIA Reply Comments DOE NBP RFI Smart Grid Communications Requirements.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

26, 2010 26, 2010 US Department of Energy Office of the General Counsel 1000 Independence Avenue, SW Room 6A245 Washington, DC 20585 Re: NBP RFI-Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy The Telecommunications Industry Association (TIA) is pleased to provide comments on the communications requirements of electric utilities relevant to smart grid policy. TIA appreciates the proactive role the Department of Energy (DOE) is taking in executing the recommendations from the FCC in the National Broadband Plan. Electric utilities and the ICT industry share a long tradition of partnering to build and maintain the communications networks contributing to the security and reliability of the grid.

187

Microsoft Word - DOCS-#287906-v1-National_Grid_Comments_on_DOE_RFI_#3.DOC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Grid's Response to National Grid's Response to the Department of Energy Smart Grid RFI: Addressing Policy and Logistical Challenges of Smart Grid Implementation Dated: November 1, 2010 1 National Grid's Response to the Department of Energy Request For Information on Smart Grid Key Policy questions that must be answered Pursuant to the Request for Information entitled "Addressing Policy and Logistical Challenges to Smart Grid Implementation," issued by the Department of Energy ("DOE") Office of Electricity Delivery and Energy Reliability (published September 17, 2010), National Grid hereby submits these comments on the continued development and implementation of Smart Grid. National Grid commends the DOE's leadership in promoting Smart Grid technologies, and appreciates the opportunity to provide the DOE

188

NBP RFI: Data Access, Third Party Use and Privacy- Comments of Utilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Use and Privacy- Comments of Use and Privacy- Comments of Utilities Telecom Council NBP RFI: Data Access, Third Party Use and Privacy- Comments of Utilities Telecom Council The Utilities Telecom Council hereby comments in response to the Department of Energy (DOE) request for information on data access, third party use, and privacy. In summary, UTC submits that the innovative deployment by energy utilities of smart meters and smart control systems will create a smart energy grid that will unlock the value of what has been called the Energy Information Economy2. Smart energy grids will create an environment in which consumers will have greater abilities to manage their own energy usage and utilities will have new tools to affect grid-wide energy efficiencies never before possible. The key to all this is data. How to provide secure access to it

189

DOE RFI Policy & Logistical Challenges_PHI_response_vFinal_logo  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EP9425 EP9425 701 9th St NW Washington, DC 20068 202 872-3227 202 872-3302 Fax wmgausman@pepco.com William M. Gausman Senior Vice President Strategic Initiatives November 1, 2010 US Department of Energy Office of Electricity Delivery and Energy Reliability 1000 Independence Avenue, SW Room 8H033 Washington, DC 20585 RE: Smart Grid RFI: Addressing Policy and Logistical Challenges Pepco Holdings, Inc. (PHI) is pleased to respond to the US Department of Energy (DOE) request for information regarding addressing policy and logistical challenges to smart grid implementation. This follows on the heels of PHI's responses to two other DOE RFls on data access and communications requirements. PHI is one of the largest energy delivery companies in the Mid-Atlantic region. PHI's three

190

Microsoft Word - TIA Reply Comments DOE NBP RFI Data Access.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

26, 2010 26, 2010 US Department of Energy Office of the General Counsel 1000 Independence Avenue, SW Room 6A245 Washington, DC 20585 Re: NBP RFI-Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use and Privacy Introduction Smart grid provides consumers with unprecedented access and control of their electricity usage, and it provides utilities with the ability to manage the electric grid with significantly greater efficiency. As the end-users, TIA believes consumers will ultimately determine how successful the smart grid can become. For utility-driven smart grid solutions, utilities can only do as much as voter-accountable regulators will allow. The success of consumer-driven smart grid solutions will rest entirely on consumer value and

191

NBP RFI: Data Access, Third Party Use, and Privacy- Comments of Oncor  

NLE Websites -- All DOE Office Websites (Extended Search)

Use, and Privacy- Comments of Use, and Privacy- Comments of Oncor Electric Deliverty Company LLC NBP RFI: Data Access, Third Party Use, and Privacy- Comments of Oncor Electric Deliverty Company LLC Oncor Electric Delivery Company LLC (Oncor) is a regulated electric transmission and distribution utility that serves the north-central, eastern and western parts of Texas, including the cities of Dallas and Fort Worth. Oncor operates the largest electric transmission and distribution system in Texas, delivering power to over 3 million homes and businesses and operating approximately 117,000 miles of distribution and transmission lines in Texas. Oncor operates in a unique market in which only competitive Retail Electric Providers (REPs) who are not utilities sell electricity to end-use consumers, and the transmission and distribution utilities (who are

192

Microsoft Word - FPL Response to DOE Smart Grid Communications RFI Final Version 071210.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Page 1 Page 1 July 12, 2010 U.S. Department of Energy Office of the General Counsel ATTN: NBP RFI: Communications Requirements 1000 Independence Avenue, SW Room 6A245 Washington, DC 20585 Re: DOE Request for Information - Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Introduction A wholly-owned subsidiary of NextEra Energy, Inc., Florida Power & Light Company (FPL) is a public utility incorporated in the State of Florida that provides wholesale and retail electric service. It is one of the largest and best-performing electric utilities in the nation. In 2008, FPL served 4.5 million customer accounts over a 27,000 square mile service territory, delivering electricity to

193

Microsoft Word - 08 09 10 Verizon DOE RFI smart grid reply comments.DOC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPLY COMMENTS OF VERIZON AND VERIZON WIRELESS REPLY COMMENTS OF VERIZON AND VERIZON WIRELESS Michael Glover Of Counsel Edward Shakin William H. Johnson VERIZON 1320 North Courthouse Road Ninth Floor Arlington, Virginia 22201 (703) 351-3060 John T. Scott, III William D. Wallace VERIZON WIRELESS 1300 I Street N.W. Suite 400 West Washington, DC 20005 August 9, 2010 As Verizon 1 noted in its opening comments in response to the Department of Energy's Request for Information (RFI), 2 effective communications networks and services are critical to the success of Smart Grid technology. Existing commercial broadband networks built and operated by experienced communications providers would best facilitate the implementation of Smart Grid technology, which requires the highly secure transmission and processing of vast amounts of information to and from

194

Microsoft Word - DOE Smart Grid RFI_APGA Comments 110110.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1000 Independence Avenue, SW, Room 8H033 Washington, D.C. 20585 RE: Smart Grid RFI: Addressing Policy and Logistical Challenges to Smart Grid Implementation, 75 Fed. Reg. 57,006 (September 17, 2010). Ladies and Gentlemen: The American Public Gas Association (APGA) is pleased to submit for your consideration the following comments in response to the U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability's Request for Information Addressing Policy and Logistical Challenges to Smart Grid Implementation, 75 Fed. Reg. 57,006 (Sep. 17, 2010). The Request seeks comment on challenges that confront smart grid implementation and recommendations on how best to

195

RFI Response  

Science Conference Proceedings (OSTI)

... focused on "uptime" and management of constituent ... apart from regulated agencies (eg Water, Energy). ... the FFIEC audit handbook and guidance ...

2013-04-13T23:59:59.000Z

196

RFI Comments  

Science Conference Proceedings (OSTI)

... Security+, Linux+, CITRMS CIPP/US, CIPP/G, CIPP/IT 2020 Pennsylvania Ave ... have begun to make an impact on in-house development application ...

2013-04-08T23:59:59.000Z

197

RFI Comments ...  

Science Conference Proceedings (OSTI)

... 1-4 XMPP Interface Standard and its built-in capabilities against cyber-attack. The standard is a secure data transformation approach, providing ...

2013-03-29T23:59:59.000Z

198

DOE/EIS-0075-SA-02: Operational and Engineering Modifications and Regulatory Review Supplemental Analysis of Site-Specific and Programmatic Environmental Impact Statements (September 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SPR-EIS-0075-SA-02 SPR-EIS-0075-SA-02 SUPPLEMENT ANALYSIS OF SITE-SPECIFIC AND PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENTS: OPERATIONAL AND ENGINEERING MODIFICATIONS, AND REGULATORY REVIEW U.S. Department of Energy Strategic Petroleum Reserve 900 Commerce Road East New Orleans, Louisiana 70123 September 2009 DOE/SPR/EIS-0075-SA02 Page 3 of 51 Prepared for the U. S. Department of Energy Strategic Petroleum Reserve Project Management Office under Contract No. DE-AC96-03PO92207 DynMcDermott Petroleum Operations Company 850 South Clearview Parkway New Orleans, Louisiana 70123 Page 4 of 51 DOE/SPR/EIS-0075-SA02 Table of Contents I. Introduction .......................................................................................................... 6

199

Technical and regulatory review of the Rover nuclear fuel process for use on Fort St. Vrain fuel  

Science Conference Proceedings (OSTI)

This report describes the results of an analysis for processing and final disposal of Fort St. Vrain (FSV) irradiated fuel in Rover-type equipment or technologies. This analysis includes an evaluation of the current Rover equipment status and the applicability of this technology in processing FSV fuel. The analyses are based on the physical characteristics of the FSV fuel and processing capabilities of the Rover equipment. Alternate FSV fuel disposal options are also considered including fuel-rod removal from the block, disposal of the empty block, or disposal of the entire fuel-containing block. The results of these analyses document that the current Rover hardware is not operable for any purpose, and any effort to restart this hardware will require extensive modifications and re-evaluation. However, various aspects of the Rover technology, such as the successful fluid-bed burner design, can be applied with modification to FSV fuel processing. The current regulatory climate and technical knowledge are not adequately defined to allow a complete analysis and conclusion with respect to the disposal of intact fuel blocks with or without the fuel rods removed. The primary unknowns include the various aspects of fuel-rod removal from the block, concentration of radionuclides remaining in the graphite block after rod removal, and acceptability of carbon in the form of graphite in a high level waste repository.

Hertzler, T. [Science Applications International Corp., Idaho Falls, ID (United States)

1993-02-01T23:59:59.000Z

200

Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 4. Evaluation of other loads and load combinations  

SciTech Connect

Six topical areas were covered by the Task Group on Other Dynamic Loads and Load Combinations as described below: Event Combinations - dealing with the potential simultaneous occurrence of earthquakes, pipe ruptures, and water hammer events in the piping design basis; Response Combinations - dealing with multiply supported piping with independent inputs, the sequence of combinations between spacial and modal components of response, and the treatment of high frequency modes in combination with low frequency modal responses; Stress Limits/Dynamic Allowables - dealing with inelastic allowables for piping and strain rate effects; Water Hammer Loadings - dealing with code and design specifications for these loadings and procedures for identifying potential water hammer that could affect safety; Relief Valve Opening and Closing Loads - dealing with the adequacy of analytical tools for predicting the effects of these events and, in addition, with estimating effective cycles for fatigue evaluations; and Piping Vibration Loads - dealing with evaluation procedures for estimating other than seismic vibratory loads, the need to consider reciprocating and rotary equipment vibratory loads, and high frequency vibratory loads. NRC staff recommendations or regulatory changes and additional study appear in this report.

Not Available

1984-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Building Regulatory Capacity for Change  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Capacity for Change PRESENTED BY Sarah Spencer-Workman, LEED AP July 27, 2011 "How to identify and review laws relevant to buildings and find places and opportunities...

202

All General Counsel Reports | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21, 2011 21, 2011 Regulatory Burden Request for Information Response to Regulatory Burden RFI March 21, 2011 Fireplace pictures pictures of fireplaces March 21, 2011 COGR Council on Governmental Relations Reducing Regulatory Burden - EO 13563 Retrospective Review March 21, 2011 Re: Regulatory Burden RFI Hearth Patio & Barbecue Association comments on Regulatory Burden RFI March 21, 2011 Re: Request for Information on Regulatory Burden of DOE Regulations Comments from Edison Electric Institute on DOE's Request for Information regarding the burden of DOE regulations. March 21, 2011 certification, compliance and enforcement regulations for Commercial Refrigeration Equipment (CRE) The current certification, compliance and enforcement regulations for

203

Serum concentrations of cortisol induced by exogenous adrenocorticotropic hormone (ACTH) are not predictive of residual feed intake (RFI) in Brahman cattle.  

E-Print Network (OSTI)

Identification of feed efficient cattle by determination of residual feed intake (RFI) of individual animals is both laborious and expensive (negative RFI value=efficient; positive RFI value=inefficient). A less costly method to predict RFI is needed. Knott et al. reported that rams with poor feed efficiency (positive RFI values) are more responsive to exogenous adrenocorticotropic hormone (ACTH); thus, we tested the hypothesis that response to an ACTH challenge in Brahman cattle is directly associated with RFI. Brahman bulls (n=12) (390±19 kg BW) and heifers (n=12) (334±12 kg BW), age 15±1 mon, with established RFI values were used. To establish RFI, after the calves were weaned, they were evaluated in separate 70 d test periods for each gender during which the animals were limit fed (2.65% BW/d) in a Calan gate feeding system. The 6 lowest and 6 highest ranking of each gender, males and females, respectively, were used to assess cortisol response to exogenous ACTH, total n = 24. Blood samples were taken via indwelling jugular catheter every 15 min from 3 h prior to challenge through 4 h after challenge at time 0 h with ACTH (0.1 IU/kg BW). Serum concentrations of cortisol were determined by radioimmunoassay using Coat-A-Count kits (intra-assay variation of 7.7% and inter-assay variation of 7.6%). Data were analyzed using GLM specific for repeated measures. Cortisol concentrations were affected by time (P0.10). Basal cortisol concentrations (M=7±1; F=14±2 ng/ml), peak cortisol concentrations (M=37±3; F=64±4 ng/ml), amplitude of responses (M=31±3; F=49±4 ng/ml), and area under the curves pre-challenge (M=189±30; F=414±60 ng/ml•h) differed (Pdata indicate that cortisol response to an ACTH challenge is not a useful predictor of RFI in Brahman cattle. However, a sexual dimorphism in the cortisol response to an ACTH challenge was detected in Brahman cattle.

Agado, Bryan Joseph

2011-01-11T23:59:59.000Z

204

Quadrant III RFI draft report: Appendix B-I, Volume 3  

SciTech Connect

In order to determine the nature and extent of contamination at a RCRA site it is often necessary to investigate and characterize the chemical composition of the medium in question that represents background conditions. Background is defined as current conditions present at a site which are unaffected by past treatment, storage, or disposal of hazardous waste (OEPA, 1991). The background composition of soils at the Portsmouth Gaseous Diffusion Plant (PORTS) site was characterized for the purpose of comparing investigative soil data to a background standard for each metal on the Target Compound List/Target Analyte List and each radiological parameter of concern in this RFI. Characterization of background compositions with respect to organic parameters was not performed because the organic parameters in the TCL/TAL are not naturally occurring at the site and because the site is not located in a highly industrialized area nor downgradient from another unrelated hazardous waste site. Characterization of the background soil composition with respect to metals and radiological parameters was performed by collecting and analyzing soil boring and hand-auger samples in areas deemed unaffected by past treatment, storage, or disposal of hazardous waste. Criteria used in determining whether a soil sample location would be representative of the true background condition included: environmental history of the location, relation to Solid Waste Management Units (SWMU's), prevailing wind direction, surface runoff direction, and ground-water flow direction.

Not Available

1992-12-01T23:59:59.000Z

205

Quadrant III RFI draft report: Appendix B-I, Volume 3  

Science Conference Proceedings (OSTI)

In order to determine the nature and extent of contamination at a RCRA site it is often necessary to investigate and characterize the chemical composition of the medium in question that represents background conditions. Background is defined as current conditions present at a site which are unaffected by past treatment, storage, or disposal of hazardous waste (OEPA, 1991). The background composition of soils at the Portsmouth Gaseous Diffusion Plant (PORTS) site was characterized for the purpose of comparing investigative soil data to a background standard for each metal on the Target Compound List/Target Analyte List and each radiological parameter of concern in this RFI. Characterization of background compositions with respect to organic parameters was not performed because the organic parameters in the TCL/TAL are not naturally occurring at the site and because the site is not located in a highly industrialized area nor downgradient from another unrelated hazardous waste site. Characterization of the background soil composition with respect to metals and radiological parameters was performed by collecting and analyzing soil boring and hand-auger samples in areas deemed unaffected by past treatment, storage, or disposal of hazardous waste. Criteria used in determining whether a soil sample location would be representative of the true background condition included: environmental history of the location, relation to Solid Waste Management Units (SWMU`s), prevailing wind direction, surface runoff direction, and ground-water flow direction.

Not Available

1992-12-01T23:59:59.000Z

206

Regulatory Tools  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Tools Regulatory Tools Home CRA - 2004 Final Recertification Decision CRA Comments & Responses CCA - 1996 CRA CARDs & TSDs CCA CARDs & TSDs Regulatory Tools Title 40 CFR Part 191 Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes. Title 40 CFR Part 194 Criteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations. Part I Title 40 CFR Part 194 Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations; Alternative Provisions; Proposed Rule. Friday August 9, 2002. Part II Title 40 CFR Part 194 Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision; Final Rule. May 18, 1998. Part III

207

Microsoft Word - NAP Coalition Response to DOE RFI DRAFT 10.11...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

efforts such as the Federal Energy Regulatory Commission's (FERC) National Action Plan on Demand Response? Response of the NAP Coalition: The National Action Plan (NAP) recognizes...

208

Regulatory overview  

Science Conference Proceedings (OSTI)

The end of 2012 and beginning of 2013 was a busy time for US regulators and standard-setters as two regulations and one consensus standard made the news. All have implications for oilseed processing and edible oil refining. Regulatory overview Public

209

Microsoft Word - Hughes + ISAT DOE NBP Smart Grid RFI comments 7-12-10 _clean_.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D.C. 20585 D.C. 20585 ____________________________________ In the Matter of ) ) Implementing the National Broadband ) Plan by Studying the Communications ) Docket ID: DOE-HQ-2009-0003-0819 Requirements of Electric Utilities to ) Inform Federal Smart Grid Policy ) ) Request for Information ) ____________________________________) COMMENTS OF HUGHES NETWORK SYSTEMS, LLC AND INMARSAT INC. Hughes Network Systems, LLC ("Hughes") and Inmarsat Inc. ("Inmarsat") hereby submit these comments in response to the Department of Energy's Request for Information ("RFI") in the above-referenced proceeding. 1 Hughes and Inmarsat are global leaders in providing satellite networks and services and satellite services, respectively. Hughes and Inmarsat, both global

210

Review  

E-Print Network (OSTI)

4) Letter (100126), C. V. Anderson to K. I. McConnell, "Submission of the Phase 1 Decommissioning Plan (DP) for West Valley Demonstration Project (WVDP) for U.S. Nuclear Regulatory Commission (NRC)

unknown authors

2008-01-01T23:59:59.000Z

211

Regulatory issues associated with the international oils & fats trade  

Science Conference Proceedings (OSTI)

FOSFA’s John Hancock reviews three major areas of regulation of the global trading of oils and fats. Regulatory issues associated with the international oils & fats trade Inform Magazine Inform Archives Regulatory issues associated with the interna

212

Air-Conditioning, Heating, and Refrigeration Institute (AHRI...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory Burden RFI Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory Burden RFI These comments...

213

Microsoft Word - EEI Comments - DOE-RFI_ Data Access _7-12-10_ TO FILE.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July July 12, 2010 U.S. Department of Energy Office of the General Counsel ATTN: NBP RFI: Data Access 1000 Independence Avenue, SW Room 6A245 Washington, DC 20585 Re: DOE Request for Information - Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy The Edison Electric Institute ("EEI"), on behalf of its member companies, hereby submits the following comments in response to the request by the Department of Energy ("DOE" or "Department") for information on state efforts to enact Smart Grid privacy and data collection policies; utility practices and policies regarding data access and collection; third party access to detailed energy information; the role of the consumer in balancing benefits of data access and privacy; and policies and practices that should 2 guide policymakers

214

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap Home > Geothermal Regulatory Roadmap > Posts by term > Geothermal Regulatory Roadmap Content Group Activity By term Q & A Feeds Term: BHFS Type Term Title Author Replies Last Post sort icon Blog entry BHFS Texas Legal Review Alevine 29 Jul 2013 - 14:46 Blog entry BHFS Happy New Year! Kyoung 21 Mar 2013 - 10:09 Blog entry BHFS Legal Reviews are Underway Kyoung 21 Mar 2013 - 09:17 Groups Menu You must login in order to post into this group. Recent content Geothermal NEPA Workshop at GRC New Robust References! Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review GRR 3rd Quarter - Stakeholder Update Meeting more Group members (12) Managers: Kyoung Recent members: AfifaAwan Dklein2012 Jweers AGill

215

Building Regulatory Capacity for Change  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Capacity for Regulatory Capacity for Change PRESENTED BY Sarah Spencer-Workman, LEED AP July 27, 2011 "How to identify and review laws relevant to buildings and find places and opportunities that can accept changes that would support building energy objectives" Presentation Highlights Rulemaking Community and Stakeholder Identification To Support Code Changes Engagement: Building Capacity for Change Pay It Forward RULEMAKING : Plan Development and Research of Laws Relevant to Buildings How is it conducted? 'Landscape' Review Key words or phrases to look for Identify "home rule" jurisdictions Update and review cycle built in 'Landscape' Review:

216

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap Home > Geothermal Regulatory Roadmap > Posts by term > Geothermal Regulatory Roadmap Content Group Activity By term Q & A Feeds Term: flora and fauna Type Term Title Author Replies Last Post sort icon Blog entry flora and fauna Texas Legal Review Alevine 29 Jul 2013 - 14:46 Groups Menu You must login in order to post into this group. Recent content Geothermal NEPA Workshop at GRC New Robust References! Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review GRR 3rd Quarter - Stakeholder Update Meeting more Group members (12) Managers: Kyoung Recent members: AfifaAwan Dklein2012 Jweers AGill Agentile Kwitherbee Kjking Payne Dhoefner Twnrel Alevine 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

217

DEPARTMENT OF ENERGY Reducing Regulatory Burden  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Billing Code 6450 01-P Billing Code 6450 01-P DEPARTMENT OF ENERGY Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Request for information. SUMMARY: As part of its implementation of Executive Order 13563, "Improving Regulation and Regulatory Review," issued by the President on January 18, 2011, the Department of Energy (DOE) is seeking comments and information from interested parties to assist DOE in reviewing its existing regulations to determine whether any such regulations should be modified, streamlined, expanded, or repealed. The purpose of DOE's review is to make the agency's regulatory program more effective and less burdensome in achieving its regulatory objectives. DATES: Written comments and information are requested on or before 45 days after

218

Request for Information (RFI) from the Department of Energy for Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NBP RFI: Data Access NBP RFI: Data Access Honeywell Responses To Request for Information (RFI) from the Department of Energy on Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy 1. Who owns energy consumption data? The utility needs access to "raw" billing data, i.e., meter readings that take place every time the price changes and allow the utility to calculate the consumption during a particular time period and rate the consumption according to the price in effect during that period. Based on the FIPP principle of data minimization, it is expected that these meter readings would occur just a few times per day (e.g., every time a new price period begins

219

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap Home > Geothermal Regulatory Roadmap > Posts by term > Geothermal Regulatory Roadmap Content Group Activity By term Q & A Feeds Term: Categorical Exclusions Type Term Title Author Replies Last Post sort icon Blog entry Categorical Exclusions Geothermal NEPA Workshop at GRC Kyoung 14 Oct 2013 - 20:19 Blog entry Categorical Exclusions GRR 3rd Quarter - Stakeholder Update Meeting Kyoung 9 Jul 2013 - 20:57 Blog entry Categorical Exclusions GRR 2nd Quarter - Stakeholder Update Meeting Kyoung 2 May 2013 - 14:06 Groups Menu You must login in order to post into this group. Recent content Geothermal NEPA Workshop at GRC New Robust References! Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review

220

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap Home > Geothermal Regulatory Roadmap > Posts by term > Geothermal Regulatory Roadmap Content Group Activity By term Q & A Feeds Term: EA Type Term Title Author Replies Last Post sort icon Blog entry EA Geothermal NEPA Workshop at GRC Kyoung 14 Oct 2013 - 20:19 Groups Menu You must login in order to post into this group. Recent content Geothermal NEPA Workshop at GRC New Robust References! Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review GRR 3rd Quarter - Stakeholder Update Meeting more Group members (12) Managers: Kyoung Recent members: AfifaAwan Dklein2012 Jweers AGill Agentile Kwitherbee Kjking Payne Dhoefner Twnrel Alevine 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation:

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap Home > Geothermal Regulatory Roadmap > Posts by term > Geothermal Regulatory Roadmap Content Group Activity By term Q & A Feeds Term: analysis Type Term Title Author Replies Last Post sort icon Blog entry analysis GRR 3rd Quarter - Stakeholder Update Meeting Kyoung 9 Jul 2013 - 20:57 Blog entry analysis GRR 2nd Quarter - Stakeholder Update Meeting Kyoung 2 May 2013 - 14:06 Blog entry analysis Happy New Year! Kyoung 21 Mar 2013 - 10:09 Groups Menu You must login in order to post into this group. Recent content Geothermal NEPA Workshop at GRC New Robust References! Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review GRR 3rd Quarter - Stakeholder Update Meeting more Group members (12) Managers:

222

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap Home > Geothermal Regulatory Roadmap > Posts by term > Geothermal Regulatory Roadmap Content Group Activity By term Q & A Feeds Term: FWS Type Term Title Author Replies Last Post sort icon Blog entry FWS Idaho Meeting #2 Kyoung 4 Sep 2012 - 21:36 Groups Menu You must login in order to post into this group. Recent content Geothermal NEPA Workshop at GRC New Robust References! Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review GRR 3rd Quarter - Stakeholder Update Meeting more Group members (12) Managers: Kyoung Recent members: AfifaAwan Dklein2012 Jweers AGill Agentile Kwitherbee Kjking Payne Dhoefner Twnrel Alevine 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142253965

223

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap Home > Geothermal Regulatory Roadmap > Posts by term > Geothermal Regulatory Roadmap Content Group Activity By term Q & A Feeds Term: Colorado Type Term Title Author Replies Last Post sort icon Blog entry Colorado Colorado Meeting Kyoung 21 Mar 2013 - 10:24 Blog entry Colorado Happy New Year! Kyoung 21 Mar 2013 - 10:09 Groups Menu You must login in order to post into this group. Recent content Geothermal NEPA Workshop at GRC New Robust References! Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review GRR 3rd Quarter - Stakeholder Update Meeting more Group members (12) Managers: Kyoung Recent members: AfifaAwan Dklein2012 Jweers AGill Agentile Kwitherbee Kjking Payne Dhoefner Twnrel Alevine 429 Throttled (bot load)

224

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap Home > Geothermal Regulatory Roadmap > Posts by term > Geothermal Regulatory Roadmap Content Group Activity By term Q & A Feeds Term: FY12 Type Term Title Author Replies Last Post sort icon Blog entry FY12 Thank You! Kyoung 21 Mar 2013 - 08:40 Groups Menu You must login in order to post into this group. Recent content Geothermal NEPA Workshop at GRC New Robust References! Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review GRR 3rd Quarter - Stakeholder Update Meeting more Group members (12) Managers: Kyoung Recent members: AfifaAwan Dklein2012 Jweers AGill Agentile Kwitherbee Kjking Payne Dhoefner Twnrel Alevine 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142253755

225

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap Home > Geothermal Regulatory Roadmap > Posts by term > Geothermal Regulatory Roadmap Content Group Activity By term Q & A Feeds Term: CX Type Term Title Author Replies Last Post sort icon Blog entry CX Geothermal NEPA Workshop at GRC Kyoung 14 Oct 2013 - 20:19 Groups Menu You must login in order to post into this group. Recent content Geothermal NEPA Workshop at GRC New Robust References! Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review GRR 3rd Quarter - Stakeholder Update Meeting more Group members (12) Managers: Kyoung Recent members: AfifaAwan Dklein2012 Jweers AGill Agentile Kwitherbee Kjking Payne Dhoefner Twnrel Alevine 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation:

226

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap Home > Geothermal Regulatory Roadmap > Posts by term > Geothermal Regulatory Roadmap Content Group Activity By term Q & A Feeds Term: feedback Type Term Title Author Replies Last Post sort icon Blog entry feedback Geothermal Stakeholder Feedback on the GRR Kyoung 21 Mar 2013 - 10:01 Groups Menu You must login in order to post into this group. Recent content Geothermal NEPA Workshop at GRC New Robust References! Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review GRR 3rd Quarter - Stakeholder Update Meeting more Group members (12) Managers: Kyoung Recent members: AfifaAwan Dklein2012 Jweers AGill Agentile Kwitherbee Kjking Payne Dhoefner Twnrel Alevine 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

227

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap Home > Geothermal Regulatory Roadmap > Posts by term > Geothermal Regulatory Roadmap Content Group Activity By term Q & A Feeds Term: Fish and Wildlife Type Term Title Author Replies Last Post sort icon Blog entry Fish and Wildlife Idaho Meeting #2 Kyoung 4 Sep 2012 - 21:36 Groups Menu You must login in order to post into this group. Recent content Geothermal NEPA Workshop at GRC New Robust References! Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review GRR 3rd Quarter - Stakeholder Update Meeting more Group members (12) Managers: Kyoung Recent members: AfifaAwan Dklein2012 Jweers AGill Agentile Kwitherbee Kjking Payne Dhoefner Twnrel Alevine 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

228

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap Home > Geothermal Regulatory Roadmap > Posts by term > Geothermal Regulatory Roadmap Content Group Activity By term Q & A Feeds Term: EIS Type Term Title Author Replies Last Post sort icon Blog entry EIS Geothermal NEPA Workshop at GRC Kyoung 14 Oct 2013 - 20:19 Groups Menu You must login in order to post into this group. Recent content Geothermal NEPA Workshop at GRC New Robust References! Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review GRR 3rd Quarter - Stakeholder Update Meeting more Group members (12) Managers: Kyoung Recent members: AfifaAwan Dklein2012 Jweers AGill Agentile Kwitherbee Kjking Payne Dhoefner Twnrel Alevine 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation:

229

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap Home > Geothermal Regulatory Roadmap > Posts by term > Geothermal Regulatory Roadmap Content Group Activity By term Q & A Feeds Term: Database Type Term Title Author Replies Last Post sort icon Blog entry Database Geothermal NEPA Workshop at GRC Kyoung 14 Oct 2013 - 20:19 Groups Menu You must login in order to post into this group. Recent content Geothermal NEPA Workshop at GRC New Robust References! Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review GRR 3rd Quarter - Stakeholder Update Meeting more Group members (12) Managers: Kyoung Recent members: AfifaAwan Dklein2012 Jweers AGill Agentile Kwitherbee Kjking Payne Dhoefner Twnrel Alevine 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

230

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap Home > Geothermal Regulatory Roadmap > Posts by term > Geothermal Regulatory Roadmap Content Group Activity By term Q & A Feeds Term: Cost Recovery Type Term Title Author Replies Last Post sort icon Blog entry Cost Recovery GRR 3rd Quarter - Stakeholder Update Meeting Kyoung 9 Jul 2013 - 20:57 Blog entry Cost Recovery GRR 2nd Quarter - Stakeholder Update Meeting Kyoung 2 May 2013 - 14:06 Groups Menu You must login in order to post into this group. Recent content Geothermal NEPA Workshop at GRC New Robust References! Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review GRR 3rd Quarter - Stakeholder Update Meeting more Group members (12) Managers: Kyoung Recent members: AfifaAwan Dklein2012 Jweers

231

Topic: Regulatory & Policy Recommendations  

Science Conference Proceedings (OSTI)

... Regulatory & Policy Recommendations. The impact of regulations and policies on the manufacturing industry in areas such as tax, energy, trade ...

2013-11-19T23:59:59.000Z

232

AARP submits the following comments on consumers and smart grid issues in response to the Request for Information (Request or RFI) on smart grid policy and logistical challenges, published by the Department of Energy (DOE) on September 16, 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AARP, National Consumer Law Center, and Public Citizen Comments to: DEPARTMENT OF ENERGY Smart Grid RFI: Addressing Policy and Logistical Challenges David Certner Legislative Counsel and Legislative Policy Director AARP Government Relations and Advocacy Olivia Wein, Staff Attorney National Consumer Law Center Tyson Slocum, Director Public Citizen's Energy Program November 1, 2010 2 CONSUMER COMMENTERS: AARP, National Consumer Law Center, and Public Citizen submit the following comments on consumers and smart grid issues in response to the Request for Information (Request or RFI) on smart grid policy and logistical challenges, published by the Department of Energy (DOE) on September 16, 2010. About AARP, National Consumer Law Center, and Public Citizen

233

| Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to the above-referenced request for information (RFI) issued by the Department of Energy (DOE). January 31, 2012 Regulatory Burden RFI Executive Order 13563 The situation...

234

Reviewer Instructions:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reviewer Instructions: Reviewer Instructions: 1. All review comments to be provided electronically using this review form. 2. Focus the review on substantive issues within your disciplinary, regulatory, or policy area. 3. Look only at the portions relevant to your agency and the land under your management. The individual land management agencies will be amending land use plans or issuing a Record of Decision, so please don't alter the other agencies' roles and responsibilities. 4. Target the review on the adequacy and reasonableness of text and analyses within your disciplinary, regulatory, or policy area. Please be aware that this is a programmatic EIS. 5. All comments should be as specific as possible. Comments such as "text unclear" or "expand" do not provide sufficient

235

Review  

E-Print Network (OSTI)

review of the Phase I DP for the West Valley Demonstration Project, Rev. I (Reference 1). DOE submitted responses to the other 38 of the 44 RAIs to NRC on August 13, 2009 (Reference 3). Enclosed are 20 paper copies of the RAI response package along with 20 compact disks. Each compact disk contains an electronic copy of the six RAI responses and two calculationQ t Dr. Keith 1. McConnell-3- September 16, 2009 For Further Information Please note that DOE's RAI responses and the proposed decommissioning approach are based on the preferred alternative in the Revised Draft Environmental Impact Statement for

unknown authors

2009-01-01T23:59:59.000Z

236

Nuclear Safety Regulatory Framework  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy Department of Energy Nuclear Safety Regulatory Framework DOE's Nuclear Safety Enabling Legislation Regulatory Enforcement & Oversight Regulatory Governance Atomic Energy Act 1946 Atomic Energy Act 1954 Energy Reorganization Act 1974 DOE Act 1977 Authority and responsibility to regulate nuclear safety at DOE facilities 10 CFR 830 10 CFR 835 10 CFR 820 Regulatory Implementation Nuclear Safety Radiological Safety Procedural Rules ISMS-QA; Operating Experience; Metrics and Analysis Cross Cutting DOE Directives & Manuals DOE Standards Central Technical Authorities (CTA) Office of Health, Safety, and Security (HSS) Line Management SSO/ FAC Reps 48 CFR 970 48 CFR 952 Federal Acquisition Regulations External Oversight *Defense Nuclear Facility

237

DSW REGULATORY AND RESTRUCTURING  

NLE Websites -- All DOE Office Websites (Extended Search)

Committee on Appropriations House Committee on Appropriations Photo of lineman repairing transmission lines in desert Western's Regulatory & Restructuring Project Managers Ron...

238

Other Regulatory Efforts  

Energy.gov (U.S. Department of Energy (DOE))

In addition to regulating international electricity trade, the Office of Electricity Delivery and Energy Reliability participates in other regulatory activities. These include:

239

FPCC Regulatory Barriers Submittal  

Energy.gov (U.S. Department of Energy (DOE))

The Federal Performance Contracting Coalition (FPCC) appreciates the opportunity to comment on reducing regulatory burdens on the Federal government, specifically as they pertain to federal energy...

240

Regulatory analysis technical evaluation handbook. Final report  

Science Conference Proceedings (OSTI)

The purpose of this Handbook is to provide guidance to the regulatory analyst to promote preparation of quality regulatory analysis documents and to implement the policies of the Regulatory Analysis Guidelines of the US Nuclear Regulatory Commission (NUREG/BR-0058 Rev. 2). This Handbook expands upon policy concepts included in the NRC Guidelines and translates the six steps in preparing regulatory analyses into implementable methodologies for the analyst. It provides standardized methods of preparation and presentation of regulatory analyses, with the inclusion of input that will satisfy all backfit requirements and requirements of NRC`s Committee to Review Generic Requirements. Information on the objectives of the safety goal evaluation process and potential data sources for preparing a safety goal evaluation is also included. Consistent application of the methods provided here will result in more directly comparable analyses, thus aiding decision-makers in evaluating and comparing various regulatory actions. The handbook is being issued in loose-leaf format to facilitate revisions. NRC intends to periodically revise the handbook as new and improved guidance, data, and methods become available.

NONE

1997-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap Home > Geothermal Regulatory Roadmap > Posts by term Content Group Activity By term Q & A Feeds 1031 regulations (1) Alaska (1) analysis (3) appropriations (1) BHFS (3) Categorical Exclusions (3) citation (1) citing (1) Colorado (2) Coordinating Permit Office (2) Cost Mechanisms (2) Cost Recovery (2) CX (1) D.C. (1) data (1) Database (1) developer (2) EA (1) EIS (1) endangered species (1) Fauna (1) feedback (1) Fish and Wildlife (1) Flora (1) flora and fauna (1) 1 2 3 next â€ș last » Groups Menu You must login in order to post into this group. Recent content Geothermal NEPA Workshop at GRC New Robust References! Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review GRR 3rd Quarter - Stakeholder Update Meeting more Group members (12)

242

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap Home > Groups > Groups > Geothermal Regulatory Roadmap Content Group Activity By term Q & A Feeds There are no feeds from external sites for this group. Groups Menu You must login in order to post into this group. Groups Menu You must login in order to post into this group. Group members (12) Managers: Kyoung Recent members: AfifaAwan Dklein2012 Jweers AGill Agentile Kwitherbee Kjking Payne Dhoefner Twnrel Alevine Recent content Geothermal NEPA Workshop at GRC New Robust References! Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review GRR 3rd Quarter - Stakeholder Update Meeting more Group members (12) Managers: Kyoung Recent members: AfifaAwan Dklein2012 Jweers AGill Agentile Kwitherbee Kjking Payne Dhoefner Twnrel Alevine 429 Throttled (bot load)

243

Building Technologies Office: Regulatory Processes  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Processes to Regulatory Processes to someone by E-mail Share Building Technologies Office: Regulatory Processes on Facebook Tweet about Building Technologies Office: Regulatory Processes on Twitter Bookmark Building Technologies Office: Regulatory Processes on Google Bookmark Building Technologies Office: Regulatory Processes on Delicious Rank Building Technologies Office: Regulatory Processes on Digg Find More places to share Building Technologies Office: Regulatory Processes on AddThis.com... About History & Impacts Statutory Authorities & Rules Regulatory Processes Plans & Schedules Reports & Publications Standards & Test Procedures Implementation, Certification & Enforcement Rulemakings & Notices Further Guidance ENERGY STARÂź Popular Links Success Stories

244

Phenylpropanoid related regulatory protein-regulatory region associations  

SciTech Connect

Materials and methods for identifying lignin regulatory region-regulatory protein associations are disclosed. Materials and methods for modulating lignin accumulation are also disclosed.

Apuya, Nestor (Culver City, CA); Bobzin, Steven Craig (Malibu, CA); Park, Joon-Hyun (Oak Park, CA); Doukhanina, Elena (Newbury Park, CA)

2012-01-03T23:59:59.000Z

245

Regulatory guidance document  

SciTech Connect

The Office of Civilian Radioactive Waste Management (OCRWM) Program Management System Manual requires preparation of the OCRWM Regulatory Guidance Document (RGD) that addresses licensing, environmental compliance, and safety and health compliance. The document provides: regulatory compliance policy; guidance to OCRWM organizational elements to ensure a consistent approach when complying with regulatory requirements; strategies to achieve policy objectives; organizational responsibilities for regulatory compliance; guidance with regard to Program compliance oversight; and guidance on the contents of a project-level Regulatory Compliance Plan. The scope of the RGD includes site suitability evaluation, licensing, environmental compliance, and safety and health compliance, in accordance with the direction provided by Section 4.6.3 of the PMS Manual. Site suitability evaluation and regulatory compliance during site characterization are significant activities, particularly with regard to the YW MSA. OCRWM`s evaluation of whether the Yucca Mountain site is suitable for repository development must precede its submittal of a license application to the Nuclear Regulatory Commission (NRC). Accordingly, site suitability evaluation is discussed in Chapter 4, and the general statements of policy regarding site suitability evaluation are discussed in Section 2.1. Although much of the data and analyses may initially be similar, the licensing process is discussed separately in Chapter 5. Environmental compliance is discussed in Chapter 6. Safety and Health compliance is discussed in Chapter 7.

NONE

1994-05-01T23:59:59.000Z

246

NUCLEAR REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 21, 1999 (Volume 64, Number 244)] December 21, 1999 (Volume 64, Number 244)] [Proposed Rules] [Page 71331-71333] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr21de99-21] ======================================================================= ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION 10 CFR Parts 71 and 73 RIN 3150-AG41 Advance Notification to Native American Tribes of Transportation of Certain Types of Nuclear Waste AGENCY: Nuclear Regulatory Commission. ACTION: Advance notice of proposed rulemaking. ----------------------------------------------------------------------- SUMMARY: The Nuclear Regulatory Commission (NRC) is considering an amendment to its regulations that would require NRC licensees to notify

247

Nuclear Safety Regulatory Assistance Reviews | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

associated with Replacement of Exhaust Ventilation Filters at the Test Reactor Area Hot Cell Facility at the Idaho National Engineering and Environmental Laboratory, May 19,...

248

MHI Comments to DOE-Regulatory Review  

Energy.gov (U.S. Department of Energy (DOE))

On behalf of the Manufactured Housing Institute (MHI) I am pleased to respond to the Department of Energy’s (DOE’s) May 15, 2012 request for comments and information regarding regulations that...

249

Nuclear Safety Regulatory Assistance Reviews | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Enforcement Letter issued to Controlled Power Company related to an Electrical Shock Near Miss that occurred in the Radiological Laboratory Utility Office Building at the...

250

Nuclear Safety Regulatory Assistance Reviews | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Violation issued to Babcock & Wilcox of Ohio, Inc., related to Radiological Work Controls and Bioassay Program Deficiencies at the Mound Site, November 16, 1998...

251

OpenEI Community - regulatory  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap featured on NREL Now http:en.openei.orgcommunitybloggeothermal-regulatory-roadmap-featured-nrel-now

252

Building Technologies Office: Regulatory Processes  

NLE Websites -- All DOE Office Websites (Extended Search)

Processes on Twitter Bookmark Building Technologies Office: Regulatory Processes on Google Bookmark Building Technologies Office: Regulatory Processes on Delicious Rank Building...

253

RFI Comments - West 030713  

Science Conference Proceedings (OSTI)

... number of water and wastewater utilities and is used in oil & gas ... to send a strong message to the marketplace that there is a demand for products ...

2013-03-29T23:59:59.000Z

254

DRAFT NNMI RFI Response  

Science Conference Proceedings (OSTI)

... Renewable energy generation and ... Federal government will need to see all of the above, plus an ... for Institutes and inhibit their ability to plan and act ...

2012-10-26T23:59:59.000Z

255

RFI Comments - RCES Center  

Science Conference Proceedings (OSTI)

... gov/ram o Nancy A. Renfroe, Joseph L. Smith, “Threat/Vulnerability ... of compliance requirements, but these requirements typically don't improve until ...

2013-04-02T23:59:59.000Z

256

RFI Comments - absio  

Science Conference Proceedings (OSTI)

... Proprietary—All Rights reserved. ... Design comprehends the materials, energy, and processes that produce the output for which the system is built. ...

2013-04-10T23:59:59.000Z

257

RFI Comments - ABB  

Science Conference Proceedings (OSTI)

... However it is primarily focused on handling incidents with the process under control (eg process conditions like boiler temperature or pressure ...

2013-04-09T23:59:59.000Z

258

Renewable RFI (Generic)  

Open Energy Info (EERE)

for Information for Information Renewable Energy Generation/Production Shreveport Airport Authority SHV AND DTN Shreveport, LA The Shreveport Airport Authority intends to issue a Request for Proposal (RFP) at some future time for renewable energy generation opportunities on Shreveport Airport property. The Authority is particularly interested in solar photovoltaic generation but other technically and economically feasible technologies may also be included. The Airport Authority will provide airport land, at both Shreveport Regional (SHV) and Shreveport Downtown Airports (DTN), for a renewable energy generation system, or systems, to be developed, constructed, owned, operated and maintained by a private entity under a lease agreement for fair market value of the land (currently appraised at

259

RFI for NC  

NLE Websites -- All DOE Office Websites (Extended Search)

Statement of Energy Service Requirements Statement of Energy Service Requirements & Format for Responses to a Request for Information GENERAL INFORMATION Document Type: Request for Information Posted Date: June 12, 2003 Original Response Date: June 26, 2003 Classification Code: 99-Miscellaneous-Renewable Energy/Renewable Energy Certificates (REC) DESCRIPTION The Federal Government is seeking interested parties to potentially supply renewable energy/REC in North Carolina behind the Duke Energy Service Territory, with the possibility of other locations as well. Requirements are estimated at approximately 30 million kWh. We are seeking Green-e certified (or the equivalent) REC, or renewable energy located close to North Carolina, but not necessarily within the state.

260

RFI Comments - Ciepiela  

Science Conference Proceedings (OSTI)

... API-1164 – pipeline SCADA security > API-1165 - Recommended Practice for Pipeline SCADA Displays > API-1167 - Alarm Management ...

2013-04-10T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

RFI Comments - Santee Cooper  

Science Conference Proceedings (OSTI)

... As provided in Federal Power Act Section 215, the ... situational awareness, operations of the grid can be ... the crp Standards, and its extension to the ...

2013-04-09T23:59:59.000Z

262

RFI Comments - API  

Science Conference Proceedings (OSTI)

... companies, exploration and production, refining, marketing, pipeline ... differ from those used to run a refinery. ... needs of an integrated oil company will ...

2013-04-09T23:59:59.000Z

263

RFI Comments - AFPM  

Science Conference Proceedings (OSTI)

... Tools used to run a refinery will differ ... The needs of an integrated oil company will ... foreign), and various requirements for refining, packaging, and ...

2013-04-09T23:59:59.000Z

264

RFI Cofmments - PHEAA  

Science Conference Proceedings (OSTI)

... Availability of systems Disaster Recovery (hot ... surveys/questionnaires Incident Response Reports BCP ... of reports and survey responses for clients is ...

2013-04-09T23:59:59.000Z

265

RFI Comments - Lineage Technologies  

Science Conference Proceedings (OSTI)

... regarding risk are also heavily influenced by China's policy to ... discharges, and FDA's authority governing the manufacture of prescription drugs. ...

2013-04-08T23:59:59.000Z

266

RFI Comments - RCC  

Science Conference Proceedings (OSTI)

... public safety network operations and data center. ... with the telecommunications, energy, financial services, water, and transportation sectors ...

2013-04-08T23:59:59.000Z

267

RFI Comments - ASIS International  

Science Conference Proceedings (OSTI)

... Sincerely, /s/ Jack Lichtenstein Vice President, Government Affairs & Public Policy ASIS International 1625 Prince Street Alexandria, VA 22314

2013-04-10T23:59:59.000Z

268

RFI Comments - Phil White  

Science Conference Proceedings (OSTI)

... Historically, the defense against espionage (counter intelligence) has also been a role of the federal government, primarily the Federal Bureau of ...

2013-04-09T23:59:59.000Z

269

RFI Comments - WEF  

Science Conference Proceedings (OSTI)

... In the United States, drinking water and wastewater utilities, collectively known as the Water Sector, are charged with implementing programs to ...

2013-04-10T23:59:59.000Z

270

RFI Comments - Cisco  

Science Conference Proceedings (OSTI)

... Our business resiliency program includes incident management ... interoperability, scalability, stability and resilience. ... missions and business functions ...

2013-04-09T23:59:59.000Z

271

RFI Comments - Waterfall  

Science Conference Proceedings (OSTI)

... Turbine vendors and many control system vendors need to receive continuous ... control system network on an offshore oil & gas production platform ...

2013-04-10T23:59:59.000Z

272

RFI Comments - Pasadena PWP  

Science Conference Proceedings (OSTI)

... address operational resilience and restoration in the ... to account for the dynamic nature oftechnology ... or interconnected at voltages ofgreater than ...

2013-04-09T23:59:59.000Z

273

RFI Comments - TIA  

Science Conference Proceedings (OSTI)

... discontinuous energy from solar and wind sources into the grid, increased ... securely communicate, and for this reason believe these trends to be ...

2013-04-10T23:59:59.000Z

274

RFI Responses & Workshop Reports  

Science Conference Proceedings (OSTI)

... 61, The Ohio State University - College of Engineering; Kramer. 62, The Solar Energy Consortium; Klein. 63, The Timken Company; Kolarik. ...

275

RFI Comments - SI Organization  

Science Conference Proceedings (OSTI)

... Officer (CISO), who reports to our Chief Information Officer (CIO). Since our CIO/CISO office provides ... process and a risk management database. ...

2013-04-10T23:59:59.000Z

276

RFI Comments - AGA  

Science Conference Proceedings (OSTI)

... There are more than 71 million residential, commercial and industrial natural gas customers in the US, of ... Current Risk Management Practices ...

2013-04-09T23:59:59.000Z

277

RFI Comments - Full Circle  

Science Conference Proceedings (OSTI)

... within all of its constituent communities; not just large corporations; by providing two essential planning products that help orient the private sector ...

2013-04-10T23:59:59.000Z

278

UIL RFI Response  

Science Conference Proceedings (OSTI)

... use 7 Page 8. • Decommissioning practices such as wiping devices/media • Forensics analysis Cybersecurity guidance ...

2013-04-26T23:59:59.000Z

279

RFI Comments - Wave Systems  

Science Conference Proceedings (OSTI)

... These attacks, such as those planted by rootkits ... PwC leveraged the power of TPMs to ... Wave EMBASSYź Remote Administration Server (ERAS) has ...

2013-04-09T23:59:59.000Z

280

RFI Comments - Microsoft  

Science Conference Proceedings (OSTI)

... 19 checklist; rather, doctrine serves to shape how one ... daunting, it is absolutely essential to find ... for the integration of facilities, equipment, personnel ...

2013-04-08T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

RFI Comments - Boeing  

Science Conference Proceedings (OSTI)

... inexpensive. LANL has already designed and deployed space assets in an 18 month time frame using these technologies. ...

2013-04-09T23:59:59.000Z

282

RFI Comments - PCI  

Science Conference Proceedings (OSTI)

... This unitary approach to securing payment card data provides operating efficiencies to payment card brands, banks and merchants, and ...

2013-04-09T23:59:59.000Z

283

RFI Comments - HITRUST  

Science Conference Proceedings (OSTI)

... 9 • NIST SP800-53 R4 SC-9(1 ... With respect to budgeting, HITRUST requires that organizations ... Study by Deloitte, which cited “budget constraints and ...

2013-04-10T23:59:59.000Z

284

RFI Comments - Conklin  

Science Conference Proceedings (OSTI)

... low as (is) reasonably achievable," which means making every reasonable effort to maintain exposures to ionizing radiation as far below the dose ...

2013-04-10T23:59:59.000Z

285

RFI Comments - FSSCC  

Science Conference Proceedings (OSTI)

... Some focus on those found in the operational risk aspects of the Basel II 6 and Basel III 7 l frameworks for assuring adequate levels of capital and ...

2013-04-09T23:59:59.000Z

286

RFI Comments - Greyhat  

Science Conference Proceedings (OSTI)

... and other targeted attacks and also drive-by malware loaded on prominent ... browser or macros in Microsoft Office D- Browser security plug-ins that ...

2013-04-10T23:59:59.000Z

287

RFI Comments - US Telecom  

Science Conference Proceedings (OSTI)

... products). For example, the 2010 attack on Google and at least thirty-three other companies from an ... The attack on Google highlights ...

2013-04-10T23:59:59.000Z

288

RFI Comments - IEDA  

Science Conference Proceedings (OSTI)

... the state agency that markets Arizona's share of ... and power interests of Arizona political subdivisions and ... Lane, Suite 140 Phoenix, AZ 85004-4603 ...

2013-04-10T23:59:59.000Z

289

RFI Comments - SCE  

Science Conference Proceedings (OSTI)

... in the DoD/DIB and the Enhanced Cybersecurity Services ... Planning o CIP-009-3 Recovery Plans for ... 1 Component " - Shipping Oil Component ~ . ...

2013-04-10T23:59:59.000Z

290

RFI Comments - X9  

Science Conference Proceedings (OSTI)

... The Standard defines a constructive method for the creation of symmetric keys, by combining two or more secret key components. ...

2013-04-09T23:59:59.000Z

291

RFI Comments - Cybersalus  

Science Conference Proceedings (OSTI)

... Use of Integrated Project Teams to identify best ... This concept of residual risk is nicely characterized ... of priority resources including nuclear assets, as ...

2013-04-09T23:59:59.000Z

292

RFI Comments - AIA  

Science Conference Proceedings (OSTI)

... including personal and commercial auto insurance, commercial property and liability coverage for businesses, homeowners' insurance, workers ...

2013-04-09T23:59:59.000Z

293

RFI Comments - Telco Capital  

Science Conference Proceedings (OSTI)

... High-level Design Science Process Flows ... ED DPOID T APPLICATIOD FLOW COD TROL ... modeling with stochastic message sequence charts. ...

2013-04-08T23:59:59.000Z

294

RFI Comments - Sempra Energy  

Science Conference Proceedings (OSTI)

... of energy constitutes a fundamental difference between natural gas and electric ... diesel fuel flowing so our nation's trains, trucks and automobiles ...

2013-04-09T23:59:59.000Z

295

RFI Comments - SMUD  

Science Conference Proceedings (OSTI)

... to the delivery of equipment such as power poles, transformers, etc ... plans to address "required actions in response to events or conditions of varying ...

2013-04-09T23:59:59.000Z

296

RFI Comments - NEMA  

Science Conference Proceedings (OSTI)

... any user that is trying to issue commands to Smart Grid devices. Encryption is yet another layer, and so on. Having a layered security architecture ...

2013-04-09T23:59:59.000Z

297

RFI Response - NARUC  

Science Conference Proceedings (OSTI)

... electrical component: distribution, transmission, generation ... 51 Keogh, “The Smart Grid: Frequently Asked ... for the automation of electromechanical ...

2013-04-08T23:59:59.000Z

298

.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HPBA COMMENTS ON DOE'S REGULATORY BURDEN RFI HPBA COMMENTS ON DOE'S REGULATORY BURDEN RFI 76 Fed. Reg. 6123 (February 3, 2011) March 21, 2011 The Hearth, Patio & Barbecue Association (HPBA) appreciates the opportunity to respond to a Department of Energy's (DOE's) request for information - published at 76 Fed. Reg. 6123 (February 3, 2011) - seeking comment and information to assist DOE in reviewing its existing regulations to determine whether such regulations should be modified or repealed pursuant to Executive Order 13563 ("Improving Regulation and Regulatory Review"), issued by President Obama on January 18, 2011. HPBA is the North American industry trade association for manufacturers, retailers, distributors, representatives, service firms, and allied associates for all

299

Category:Geothermal Regulatory Roadmap Elements | Open Energy Information  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Elements Geothermal Regulatory Roadmap Elements Jump to: navigation, search GRR-logo.png Looking for the Geothermal Regulatory Roadmap? Click here for a user-friendly list of Geothermal Regulatory Roadmap pages. Add.png Add an Element Pages in this category are created or edited using the RRElement form. Pages in category "Geothermal Regulatory Roadmap Elements" The following 40 pages are in this category, out of 40 total. 1 GRR/Elements/14-CA-b.1 - NPDES Permit Application GRR/Elements/14-CA-b.10 - Did majority of RWQCB approve the permit GRR/Elements/14-CA-b.11 - EPA Review of Adopted Permit GRR/Elements/14-CA-b.12 - Were all EPA objections resolved GRR/Elements/14-CA-b.13 - NPDES Permit issued GRR/Elements/14-CA-b.2 - Review of application for completeness

300

Comments on Request For Information regarding Reducing Regulatory Reform  

NLE Websites -- All DOE Office Websites (Extended Search)

Comments on Request For Information regarding Reducing Regulatory Comments on Request For Information regarding Reducing Regulatory Reform issued February 3, 2011 (Federal Register /Vol. 76, No. 23 /Thursday, February 3, 2011 /Notices). Comments on Request For Information regarding Reducing Regulatory Reform issued February 3, 2011 (Federal Register /Vol. 76, No. 23 /Thursday, February 3, 2011 /Notices). I have reviewed the Request For Information regarding Reducing Regulatory Reform issued February 3, 2011 (Federal Register /Vol. 76, No. 23 /Thursday, February 3, 2011 /Notices). In the Department of Energy"s (DOE) attempt to meet its obligation to implement Executive Order 13563, ""Improving Regulation and Regulatory Review,"" issued by the President on January 18, 2011, I recommend DOE make a bold move to change

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Codes and standards and other guidance cited in regulatory documents  

SciTech Connect

As part of the U.S. Nuclear Regulatory Commission (NRC) Standard Review Plan Update and Development Program (SRP-UDP), Pacific Northwest National Laboratory developed a listing of industry consensus codes and standards and other government and industry guidance referred to in regulatory documents. The SRP-UDP has been completed and the SRP-Maintenance Program (SRP-MP) is now maintaining this listing. Besides updating previous information, Revision 3 adds approximately 80 citations. This listing identifies the version of the code or standard cited in the regulatory document, the regulatory document, and the current version of the code or standard. It also provides a summary characterization of the nature of the citation. This listing was developed from electronic searches of the Code of Federal Regulations and the NRC`s Bulletins, Information Notices, Circulars, Enforcement Manual, Generic Letters, Inspection Manual, Policy Statements, Regulatory Guides, Standard Technical Specifications and the Standard Review Plan (NUREG-0800).

Nickolaus, J.R.; Bohlander, K.L.

1996-08-01T23:59:59.000Z

302

Nuclear Regulatory Commission Information Digest, 1991 edition  

Science Conference Proceedings (OSTI)

The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs.

Olive, K L

1991-03-01T23:59:59.000Z

303

EPAct Transportation Regulatory Activities: Contacts for EPAct  

NLE Websites -- All DOE Office Websites (Extended Search)

Contacts Contacts for EPAct Transportation Regulatory Activities to someone by E-mail Share EPAct Transportation Regulatory Activities: Contacts for EPAct Transportation Regulatory Activities on Facebook Tweet about EPAct Transportation Regulatory Activities: Contacts for EPAct Transportation Regulatory Activities on Twitter Bookmark EPAct Transportation Regulatory Activities: Contacts for EPAct Transportation Regulatory Activities on Google Bookmark EPAct Transportation Regulatory Activities: Contacts for EPAct Transportation Regulatory Activities on Delicious Rank EPAct Transportation Regulatory Activities: Contacts for EPAct Transportation Regulatory Activities on Digg Find More places to share EPAct Transportation Regulatory Activities: Contacts for EPAct Transportation Regulatory Activities on

304

Welcome Year in Review  

National Nuclear Security Administration (NNSA)

1 NMMSS Users Annual Training Meeting Orlando, Florida-May 23-25, 2006 Sponsored by the U.S. Department of Energy & the U.S. Nuclear Regulatory Commission Welcome & Year In Review...

305

Nuclear Regulatory Commission Regulatory and Licensing Matters | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Commission Regulatory and Licensing Matters Regulatory Commission Regulatory and Licensing Matters Nuclear Regulatory Commission Regulatory and Licensing Matters GC-52 provides legal advice to DOE regarding Nuclear Regulatory Commission (NRC) regulatory and licensing matters of interest to DOE, either as an NRC license applicant or in connection with related authorities and responsibilities of DOE and NRC on nuclear material, nuclear waste, and nuclear nonproliferation matters. GC-52 attorneys provide advice and support on a variety of NRC matters including regulation and licensing of DOE independent spent fuel storage facilities (ISFSIs) and a mixed-oxide fuel fabrication facility, consultation with NRC on certain DOE waste determinations, and imports and exports of nuclear materials and radioactive sealed sources.

306

regulatory | OpenEI Community  

Open Energy Info (EERE)

regulatory Home Graham7781's picture Submitted by Graham7781(1992) Super contributor 5 August, 2013 - 14:18 Geothermal Regulatory Roadmap featured on NREL Now geothermal NREL...

307

NREL: Regulatory Support - Key Activities  

NLE Websites -- All DOE Office Websites (Extended Search)

The Regulatory Support team assists the U.S. Department of Energy by providing regulatory information related to the Energy Policy Act of 1992 and other legislation to help build...

308

USNRC REGULATORY GUIDES  

E-Print Network (OSTI)

Regulatory Guides are issued to describe and make available to the public methods acceptable to the NRC staff of implementing specific parts of the Commission's regulations, to delineate tech niques used by the staff in evaluating specific problems or postu lated accidents or to provide guidance to applicants. Regulatory Guides are not substitutes for regulations, and compliance with them is not required. Methods and solutions different from those set out in the guides will be acceptable If they provide a basis for the findings requisite to the Issuance or continuance of a permit or license by the Commission. This guide was issued after consideration of comments received from the public. Comments and suggestions for improvements in these guides are encouraged at all times, and guides will be revised, as appropriate, to accommodate comments and to reflect new Informa tion or experience. Comments should be sent to the Secretary of the Commission,

unknown authors

1982-01-01T23:59:59.000Z

309

Nevada Meeting #2 - Regulatory Issues | OpenEI Community  

Open Energy Info (EERE)

Nevada Meeting #2 - Regulatory Issues Nevada Meeting #2 - Regulatory Issues Home > Groups > Geothermal Regulatory Roadmap Kyoung's picture Submitted by Kyoung(155) Contributor 2 August, 2012 - 18:43 water + monitoring + Nevada + permitting The second Nevada permitting meeting was held Tuesday, July 24th in Reno, and was attended by approximately 15 people from industry and agencies. Participants reviewed the Nevada Geothermal Regulatory roadmaps that had been reviewed and revised in the first Nevada meeting. During this meeting, identified potential issues they've encountered in permitting in Nevada. One example of issue that was raised is that water monitoring programs are sometimes required at the federal, state and county levels - all with different requirements. Additionally, different Nevada BLM field offices

310

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STATES OF AMERICA STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon NOTICE OF AVAILABILITY OF ENVIRONMENTAL ASSESSMENT (December 3, 2010) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Reedsport OPT Wave Park, LLC's application for license for the Reedsport OPT Wave Park Project

311

U.S. Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15, 2011 15, 2011 U.S. Department of Energy Office of the General Counsel 1000 Independence Avenue, SW Room 6A245 Washington, D.C. 20585 {Re: Department of Energy Request for Information: Reducing Regulatory Burden (Reply Comments)} The National Propane Gas Association (NPGA) offers the following reply comments in response to the Department of Energy's (DOE's) February 3, 2011 Request for Information (RFI) seeking comment and information to assist DOE in reviewing its existing regulations to determine whether such regulations should be modified or repealed. {See 76 FR 6123} This RFI was published by DOE pursuant to Executive Order 13563, titled "Improving Regulation and Regulatory Review,"

312

Colorado/Transmission/Regulatory Overview | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission/Regulatory Overview < Colorado‎ | Transmission Jump to: navigation, search Colorado Transmission Transmission Regulatory Overview Roadmap State Data Regulatory Overview General Transmission Permitting at a Glance In Colorado, local governments (counties and municipalities) have the authority to site high-voltage transmission lines. The State's authority in siting is limited to a backstop appeal process, by which utilities may submit an appeal to local government decisions to the Colorado Public Utilities Commission (CPUC) for review and resolution.

313

PEER REVIEW PROGRAM  

SciTech Connect

The Institute for Regulatory Science (RS) and the American Society of Mechanical Engineers (ASME) jointly estab lished a peer-review program. As the program evolved, four types of review were established. A process for stakeholder participation in peer review eetings was also developed. While a committee established by the ASME provided oversight to the peer-review process, the RSI managed the day-to-day operations of peer review panels. In addition to the reports resulting from peer review of specific projects, several documents were prepared to facilitate the review process, all of which were widely distributed.

MOGHISSI, A ALAN; LOVE, BETTY R; STRAJA, SORIN R

2007-09-29T23:59:59.000Z

314

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

geothermal geothermal Type Term Title Author Replies Last Post sort icon Blog entry geothermal Geothermal Regulatory Roadmap featured on NREL Now Graham7781 5 Aug 2013 - 13:18 Blog entry geothermal GRR 3rd Quarter - Stakeholder Update Meeting Kyoung 9 Jul 2013 - 20:57 Blog entry geothermal GRR 2nd Quarter - Stakeholder Update Meeting Kyoung 2 May 2013 - 14:06 Groups Menu You must login in order to post into this group. Recent content Geothermal NEPA Workshop at GRC New Robust References! Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review GRR 3rd Quarter - Stakeholder Update Meeting more Group members (12) Managers: Kyoung Recent members: AfifaAwan Dklein2012 Jweers AGill Agentile Kwitherbee Kjking Payne Dhoefner Twnrel Alevine 429 Throttled (bot load)

315

certification, compliance and enforcement regulations for Commercial...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

needs to be redone. certification, compliance and enforcement regulations for Commercial Refrigeration Equipment (CRE) More Documents & Publications Regulatory Burden RFI...

316

Building Technologies Office: Regulatory Processes  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Processes Beginning with the Energy Policy and Conservation Act of 1975, Congress has enacted a series of laws establishing federal appliance and equipment standards and...

317

Proposed Rules Federal Register  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31548 31548 Vol. 77, No. 103 Tuesday, May 29, 2012 DEPARTMENT OF ENERGY 5 CFR Chapter XXII 10 CFR Chapters II, III, X Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Notice of extension of public comment period. SUMMARY: This notice announces that the period for submitting comments on the Department of Energy's (DOE) request for information (RFI) issued as part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' is extended to June 19, 2012. DATES: DOE will accept comments, data, and information regarding the RFI received no later than June 19, 2012. ADDRESSES: Interested persons are encouraged to submit comments, identified by ''Regulatory Burden RFI,'' by any of the following methods:

318

Demand Response & Smart Grid - State Legislative and Regulatory Policy  

Open Energy Info (EERE)

Demand Response & Smart Grid - State Legislative and Regulatory Policy Demand Response & Smart Grid - State Legislative and Regulatory Policy Actions: October 2008 to May 2010 Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Demand Response & Smart Grid - State Legislative and Regulatory Policy Actions: October 2008 to May 2010 Focus Area: Energy Efficiency, - Utility Topics: Socio-Economic Website: www.demandresponsesmartgrid.org/Resources/Documents/State%20Policy%20S Equivalent URI: cleanenergysolutions.org/content/demand-response-smart-grid-state-legi Language: English Policies: Regulations Regulations: Enabling Legislation This report reviews the implementation of utility efficiency programs in the United States at both the state and federal levels. In addition, the updated report catalogues regulatory commission action, independent of

319

Alternative future environmental regulatory approaches for petroleum refineries.  

Science Conference Proceedings (OSTI)

Recently, many industrial, regulatory, and community leaders have expressed concern that the current environmental regulatory structure disregards multimedia environmental impacts, provides few incentives to develop and use new technologies, and fails to consider site-specific conditions. For the US petroleum refining industry, faced with the need to produce higher-quality fuels from poorer-quality feedstocks, such criticisms are expected to increase. This article offers two alternative environmental regulatory approaches for existing petroleum refineries to use in the future. These alternative approaches are multimedia in scope, provide for new technology development and use, and allow flexibility in the means for meeting environmental goals. They have been reviewed and critiqued by various stakeholders, including industry representatives, regulators, and local and national community and environmental organizations. The integration of stakeholder comments and findings of ongoing national and international regulatory reinvention efforts in the development of these approaches positions them for potential use by other industries in addition to petroleum refineries.

Elcock, D.; Gasper, J.; Moses, D. O.; Emerson, D.; Arguerro, R.; Environmental Assessment; DOE; Analytical Services, Inc.

2000-01-01T23:59:59.000Z

320

DOE Seeks Reply Comments on Reducing Regulatory Burden | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

Reply Comments on Reducing Regulatory Burden Reply Comments on Reducing Regulatory Burden DOE Seeks Reply Comments on Reducing Regulatory Burden March 22, 2011 - 5:24pm Addthis The Department of Energy today announces the opening of the reply comment period for its Request for Information implementing Executive Order 13563, seeking public comment on how best to review its existing regulations and to identify whether any of its existing regulations should be modified, streamlined, expanded, or repealed. The Department is now interested in receiving comment on the suggestions and comments received from outside parties. Those comments and suggestions are posted on the Office of the General Counsel website: Retrospective Review of Regulations. On January 31, 2011, the Department took two steps to launch its

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

DOE - Office of Legacy Management -- Rocky Flats Regulatory Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Documents Regulatory Documents Rocky Flats Site, Colorado Regulatory Documents All documents are Adobe Acrobat files. pdf_icon Notification that GS01 is no longer an RFLMA Point of Compliance (POC) Third Five-Year Review Report for the Rocky Flats Site Rocky Flats Legacy Management Agreement Environmental Covenant, November 14, 2011 Corrective Action Decision/Record of Decision Amendment for Rocky Flats Plant (USDOE) Central Operable Unit Proposed Plan for the Rocky Flats CAD/ROD Amendment (June 2011) Second Five-Year Review Report for the Rocky Flats Site Corrective Action Decision/Record of Decision for Rocky Flats Plant (USDOE) Peripheral Operable Unit and Central Operable Unit Rocky Flats Environmental Technology Site Proposed Plan Present Landfill Monitoring and Maintenance Plan

322

Geothermal Regulatory Roadmap Workshop at GRC | Open Energy Information  

Open Energy Info (EERE)

Roadmap Workshop at GRC Roadmap Workshop at GRC Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections GRR Project Review and Workshop Register for this Event The Geothermal Regulatory Roadmap project team will be holding a project review and summary workshop in Reno in early October. We are inviting all industry and agency personnel who have participated in this process, and any other interested parties to attend and continue to participate in this roadmapping process. Note that although this workshop is timed to be held during the GRC/GEA Conference and Tradeshow, this workshop is not part of that conference; therefore, conference registration is not required to attend the Regulatory Roadmapping workshop. From 10 AM to noon, come and view the permitting roadmaps from the 8 states

323

Developing a Regulatory Framework for Extended Storage and Transportat...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Storage and Transportation Developing a Regulatory Framework for Extended Storage and Transportation Outline: Current Regulatory Framework Future Regulatory Needs Technical...

324

Regulatory Drivers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regulatory Drivers Regulatory Drivers Regulatory Drivers Statutes and Regulations Relating to Legacy Management Code of Federal Regulations (CFR) Title 10: Energy "Licensing Requirements for Land Disposal of Radioactive Waste," 10 CFR 61 "Occupational Radiation Protection," 10 CFR 835 Title 40: Protection of Environment "National Primary Drinking Water Regulations," 40 CFR 141 "Standards for Owners and Operators of Hazardous Waste Treatment, Storage and Disposal Facilities," 40 CFR 264 "National Oil and Hazardous Substances Pollution Contingency Plan," 40 CFR 300 Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)/Resource Conservation and Recovery Act (RCRA) "Comprehensive Environmental Response, Compensation, and Liability

325

THE FEDERAL ENERGY REGULATORY COMMISSION'S UNCLASSIFIED CYBER...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

THE FEDERAL ENERGY REGULATORY COMMISSION'S UNCLASSIFIED CYBER SECURITY PROGRAM 2002, IG-0569 THE FEDERAL ENERGY REGULATORY COMMISSION'S UNCLASSIFIED CYBER SECURITY PROGRAM 2002,...

326

Regulatory Compliance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regulatory Compliance Regulatory Compliance Regulatory Compliance This photo shows the inside the K West Basin facility, where workers are retrieving highly radioactive sludge material under 17 feet of water. This photo shows the inside the K West Basin facility, where workers are retrieving highly radioactive sludge material under 17 feet of water. The Department of Energy is not a regulatory agency; however it does self-regulate its own radioactive waste. DOE is also affected by a variety of statutes, legislation, regulations, directives and guidance. Many of the current compliance-related actions revolve around waste and material disposition. These include National Environmental Policy Act (NEPA) Environmental Impact Statements and Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Records of Decision. Links, below,

327

Nuclear Regulatory Commission issuances  

SciTech Connect

This document is the March 1996 listing of NRC issuances. Included are: (1) NRC orders granting Cleveland Electric Illuminating Company`s petition for review of the ASLB order LBP-95-17, (2) NRC orders relating to the potential disqualification of two commissioners in the matter of the decommissioning of Yankee Nuclear Power Station, (3) ASLB orders pertaining to the Oncology Services Corporation, (4) ASLB orders pertaining to the Radiation Oncology Center, (5) ASLB orders pertaining to the Yankee Nuclear Power Station, and (6) Director`s decision pertaining to the Yankee Nuclear Power Station.

NONE

1996-03-01T23:59:59.000Z

328

Regulatory facility guide for Ohio  

Science Conference Proceedings (OSTI)

The Regulatory Facility Guide (RFG) has been developed for the DOE and contractor facilities located in the state of Ohio. It provides detailed compilations of international, federal, and state transportation-related regulations applicable to shipments originating at destined to Ohio facilities. This RFG was developed as an additional resource tool for use both by traffic managers who must ensure that transportation operations are in full compliance with all applicable regulatory requirements and by oversight personnel who must verify compliance activities.

Anderson, S.S.; Bock, R.E.; Francis, M.W.; Gove, R.M.; Johnson, P.E.; Kovac, F.M.; Mynatt, J.O. [Oak Ridge National Lab., TN (United States); Rymer, A.C. [Transportation Consulting Services, Knoxville, TN (United States)

1994-02-28T23:59:59.000Z

329

Codes and standards and other guidance cited in regulatory documents. Revision 1  

Science Conference Proceedings (OSTI)

As part of the US Nuclear Regulatory Commission (NRC) Standard Review Plan Update and Development Program, Pacific Northwest Laboratory developed a listing of industry consensus codes and standards and other government and industry guidance referred to in regulatory documents. In addition to updating previous information, Revision 1 adds citations from the NRC Inspection Manual and the Improved Standard Technical Specifications. This listing identifies the version of the code or standard cited in the regulatory document, the regulatory document, and the current version of the code or standard. It also provides a summary characterization of the nature of the citation. This listing was developed from electronic searches of the Code of Federal Regulations and the NRC`s Bulletins, Information Notices, Circulars, Generic Letters, Policy Statements, Regulatory Guides, and the Standard Review Plan (NUREG-0800).

Ankrum, A.; Nickolaus, J.; Vinther, R.; Maguire-Moffitt, N.; Hammer, J.; Sherfey, L.; Warner, R. [Pacific Northwest Lab., Richland, WA (United States)

1994-08-01T23:59:59.000Z

330

Vehicle Technologies Office: EPAct Transportation Regulatory Activities  

NLE Websites -- All DOE Office Websites (Extended Search)

Vehicle Technologies Office: EPAct Transportation Vehicle Technologies Office: EPAct Transportation Regulatory Activities to someone by E-mail Share Vehicle Technologies Office: EPAct Transportation Regulatory Activities on Facebook Tweet about Vehicle Technologies Office: EPAct Transportation Regulatory Activities on Twitter Bookmark Vehicle Technologies Office: EPAct Transportation Regulatory Activities on Google Bookmark Vehicle Technologies Office: EPAct Transportation Regulatory Activities on Delicious Rank Vehicle Technologies Office: EPAct Transportation Regulatory Activities on Digg Find More places to share Vehicle Technologies Office: EPAct Transportation Regulatory Activities on AddThis.com... Home About Covered Fleets Compliance Methods Alternative Fuel Petitions Resources The U.S. Department of Energy's (DOE) Vehicle Technologies Office manages

331

EPAct Transportation Regulatory Activities: Key Federal Statutes  

NLE Websites -- All DOE Office Websites (Extended Search)

Key Key Federal Statutes to someone by E-mail Share EPAct Transportation Regulatory Activities: Key Federal Statutes on Facebook Tweet about EPAct Transportation Regulatory Activities: Key Federal Statutes on Twitter Bookmark EPAct Transportation Regulatory Activities: Key Federal Statutes on Google Bookmark EPAct Transportation Regulatory Activities: Key Federal Statutes on Delicious Rank EPAct Transportation Regulatory Activities: Key Federal Statutes on Digg Find More places to share EPAct Transportation Regulatory Activities: Key Federal Statutes on AddThis.com... Home About Contacts Covered Fleets Compliance Methods Alternative Fuel Petitions Resources Key Federal Statutes These are excerpts from federal statutes that established key Energy Policy Act (EPAct) transportation regulatory activities.

332

Federal Energy Regulatory Commission's Fiscal Year 2010 Financial Statement Audit  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2010 9, 2010 REPLY TO ATTN TO: IG-34 (A10FN002) SUBJECT: Federal Energy Regulatory Commission's Fiscal Year 2010 Financial Statement Audit Report No.: OAS-FS-11-02 TO: Chairman, Federal Energy Regulatory Commission The attached report presents the results of the independent certified public accountants' audit of the Federal Energy Regulatory Commission's (Commission) Fiscal Year 2010 balance sheet and the related statements of net cost, changes in net position, budgetary resources, and custodial activity. To fulfill the Office of Inspector General's audit responsibilities, we contracted with the independent public accounting firm of KPMG LLP (KPMG) to conduct the audit, subject to our review. KPMG is responsible for expressing an opinion on the

333

Nuclear Regulatory Commission Information Digest 1994 edition. Volume 6  

SciTech Connect

The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRCs regulatory responsibility the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear-and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1993, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

Stadler, L.

1994-03-01T23:59:59.000Z

334

Regulatory and Permitting Issues  

DOE Green Energy (OSTI)

As part of the West Coast Regional Carbon Sequestration Partnership (WESTCARB), Terralog Technologies USA, Inc., reviewed current state and federal regulations related to carbon dioxide capture and storage within geologic formations and enhanced carbon uptake in terrestrial ecosystems. We have evaluated and summarized the current and possible future permitting requirements for the six states that comprise the West Coast Regional Partnership. Four options exist for CO{sub 2} injection into appropriate geologic formations, including storage in: (1) oil and gas reservoirs, (2) saline formations, (3) unmineable coal beds, and (4) salt caverns. Terrestrial CO{sub 2} sequestration involves improved carbon conservation management (e.g. reduction of deforestation), carbon substitution (e.g., substitution for fossil fuel-based products, energy conservation through urban forestry, biomass for energy generation), and improved carbon storage management (e.g., expanding the storage of carbon in forest ecosystems). The primary terrestrial options for the West Coast Region include: (1) reforestation of under-producing lands (including streamside forest restoration), (2) improved forest management, (3) forest protection and conservation, and (4) fuel treatments for the reduction of risk of uncharacteristically severe fires (potentially with associated biomass energy generation). The permits and/or contracts required for any land-use changes/disturbances and biomass energy generation that may occur as part of WESTCARB's activities have been summarized for each state.

Larry Myer

2005-12-01T23:59:59.000Z

335

Review of Used Nuclear Fuel Storage and Transportation Technical...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the U.S. Nuclear Regulatory Commission (NRC), the Electric Power Research Institute (EPRI), and the International Atomic Energy Agency (IAEA). The documents reviewed are:...

336

Building Technologies Office: Regulatory Processes  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Processes Regulatory Processes Beginning with the Energy Policy and Conservation Act of 1975, Congress has enacted a series of laws establishing federal appliance and equipment standards and the Department of Energy's (DOE) authority to develop, amend, and implement standards. To implement these laws, the Appliance and Equipment Standards program manages the regulatory processes described below. Standards Development and Revision Standards for a given product may be mandated by Congress or established by DOE pursuant to statutory authority. Standards established by DOE are developed through a multi-step rulemaking process that includes public participation. Test Procedure Development and Revision Most standards rulemakings are accompanied by a concurrent test procedure rulemaking. Test procedures detail how manufacturers must test their products to certify that they comply with the applicable energy conservation standards. (42 U.S.C. 6293; 6314) DOE also uses the test procedures to determine compliance with the applicable standards. (42 U.S.C. 6295(s))

337

Toshiba RFI Comments.xlsx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Definition and Scope Definition and Scope Answer/Comment 1 What significant policy challenges are likely to remain unaddressed if we employ Title XIII's definition? The following points are not referencedd in EISA 1301. ・Power provider should also control the output fluctuation of renewable resources. ・The end user should have the choice of which form of power storage to be used. Certain types of energy conservation and storage could work better in different applications (e.g. not only electricity power but also stored thermal energy which is more efficient for some purpose.) 2 If the definition is overly broad, what policy risks emerge as a result? In that case, the budget will be much greater in scale. Certain smart grid investments may not be as cost effective and could get lost in the overall

338

Microsoft Word - RFI - v1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability From: Professor Deepak Divan, Associate Director, Strategic Energy Institute, Georgia Institute of Technology Professor, School of Electrical and Computer Engineering, Georgia Institute of Technology Subject: Response to Request for Information titled "Addressing Policy and Logistical Challenges to Smart Grid Implementation" Overview: We support the Department's interest to "seek to assure smart grid deployments benefit consumers, the economy and the environment." Current smart grid initiatives are occurring in a largely uncoordinated fashion and tend to increase near-term energy costs. Meanwhile, Renewable Portfolio Standards are also expected to increase near-

339

RFI Comments - Idaho National Laboratory  

Science Conference Proceedings (OSTI)

... These vulnerabilities are analyzed the common vulnerability reports produced the by National SCADA Test Bed at the Idaho National Laboratory ...

2013-04-12T23:59:59.000Z

340

RFI Comments - Digital Management Inc.  

Science Conference Proceedings (OSTI)

... Lessons from energy, oil, gas, or any large manufacturing industry ... Enterprise Encryption Key and Digital Certificate Management Market Outlook. ...

2013-04-08T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

RFI Response - L3 Communications  

Science Conference Proceedings (OSTI)

... This proposal is an unpublished work of Level 3 ... This causes a breakdown of security in the supply ... This unique structure gives Level 3 full visibility ...

2013-04-08T23:59:59.000Z

342

RFI Comments - EnerNex  

Science Conference Proceedings (OSTI)

... Substations often have dependencies on telecommunications ... and low-level technical testing are key ... current reliance on test-based certifications ...

2013-04-10T23:59:59.000Z

343

RFI Comments - SafeGov  

Science Conference Proceedings (OSTI)

... CIGIE), and sector coordinating councils such as Electricity Sub-Sector Coordinating Council will be important entities to help orient stakeholders ...

2013-04-10T23:59:59.000Z

344

RFI Comments - Tacoma Public Utilities  

Science Conference Proceedings (OSTI)

... devices insecure due to lack of necessary support for basic security 38 ... Because of the critical nature of the 40 electricity subsector's service delivery ...

2013-04-11T23:59:59.000Z

345

RFI Comments - Electric Trade Association  

Science Conference Proceedings (OSTI)

... More than 2,000 public power utilities provide over 15 percent of all kilowatt-hour sales of electricity to ultimate customers, and do business in every ...

2013-04-10T23:59:59.000Z

346

RFI Comments - Jean C 031013  

Science Conference Proceedings (OSTI)

... until critical business head approves. Includes gmail, facebook, $$ transfers, all protocols, etc. Users who have legitimate ...

2013-03-29T23:59:59.000Z

347

RFI Comments - McAfee  

Science Conference Proceedings (OSTI)

... Meanwhile, the end user / home owner is oblivious to the rootkits and key-loggers installed on their systems and that their personal information and ...

2013-04-10T23:59:59.000Z

348

RFI Comments - Electric Power Coalition  

Science Conference Proceedings (OSTI)

... The power grid is a complex infrastructure made up of networked generation, transmission, distribution, control, and communication technologies ...

2013-04-10T23:59:59.000Z

349

Microsoft Word - DOE RFI 100712  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

requirements of utilities, including but not limited to, the requirements of the Smart Grid. The implementation of smart grid technologies is a long-term investment into...

350

Regulatory Uncertainty and Regulatory Scope Thomas P. Lyon  

E-Print Network (OSTI)

, is the shift from municipal to state regulation of natural gas and electricity that occurred in the first in the natural gas industry, and notes that "[S]tate regulatory commissions were less responsive to the demands of local voters and consumers. On average, state regulators tolerated higher gas rates than did local

Lyon, Thomas P.

351

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

Coordinating Permit Office Coordinating Permit Office Type Term Title Author Replies Last Post sort icon Blog entry Coordinating Permit Office GRR 3rd Quarter - Stakeholder Update Meeting Kyoung 9 Jul 2013 - 20:57 Blog entry Coordinating Permit Office GRR 2nd Quarter - Stakeholder Update Meeting Kyoung 2 May 2013 - 14:06 Groups Menu You must login in order to post into this group. Recent content Geothermal NEPA Workshop at GRC New Robust References! Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review GRR 3rd Quarter - Stakeholder Update Meeting more Group members (12) Managers: Kyoung Recent members: AfifaAwan Dklein2012 Jweers AGill Agentile Kwitherbee Kjking Payne Dhoefner Twnrel Alevine 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

352

DOE Seeks Further Public Input on How Best To Streamline Existing  

NLE Websites -- All DOE Office Websites (Extended Search)

Further Public Input on How Best To Streamline Existing Further Public Input on How Best To Streamline Existing Regulations DOE Seeks Further Public Input on How Best To Streamline Existing Regulations December 7, 2011 - 12:34pm Addthis The Department of Energy (DOE) has announced a further step to implementing the President's Executive Order on Improving Regulatory Review. The Executive Order directs federal agencies to review existing regulations and determine whether they are still necessary and crafted effectively to solve current problems. Engaging the public in an open, transparent process is a crucial step in DOE's regulatory review process. Because public comments in response to the Request for Information (RFI) issued in January were important in the development of DOE's plan for retrospective regulatory review, DOE issued a second RFI this week asking the public how

353

EPAct Transportation Regulatory Activities: Key Terms  

NLE Websites -- All DOE Office Websites (Extended Search)

Key Terms Key Terms to someone by E-mail Share EPAct Transportation Regulatory Activities: Key Terms on Facebook Tweet about EPAct Transportation Regulatory Activities: Key Terms on Twitter Bookmark EPAct Transportation Regulatory Activities: Key Terms on Google Bookmark EPAct Transportation Regulatory Activities: Key Terms on Delicious Rank EPAct Transportation Regulatory Activities: Key Terms on Digg Find More places to share EPAct Transportation Regulatory Activities: Key Terms on AddThis.com... Home About Covered Fleets Compliance Methods Alternative Fuel Petitions Resources Guidance Documents Statutes & Regulations Program Annual Reports Fact Sheets Newsletter Case Studies Workshops Tools Key Terms FAQs Key Terms The Energy Policy Act (EPAct) includes specific terminology related to

354

EPAct Transportation Regulatory Activities: Alternative Compliance for  

NLE Websites -- All DOE Office Websites (Extended Search)

Alternative Compliance for State and Alternative Fuel Provider Fleets to someone by E-mail Share EPAct Transportation Regulatory Activities: Alternative Compliance for State and Alternative Fuel Provider Fleets on Facebook Tweet about EPAct Transportation Regulatory Activities: Alternative Compliance for State and Alternative Fuel Provider Fleets on Twitter Bookmark EPAct Transportation Regulatory Activities: Alternative Compliance for State and Alternative Fuel Provider Fleets on Google Bookmark EPAct Transportation Regulatory Activities: Alternative Compliance for State and Alternative Fuel Provider Fleets on Delicious Rank EPAct Transportation Regulatory Activities: Alternative Compliance for State and Alternative Fuel Provider Fleets on Digg Find More places to share EPAct Transportation Regulatory

355

EPAct Transportation Regulatory Activities: Alternative Fuel Petitions  

NLE Websites -- All DOE Office Websites (Extended Search)

Alternative Fuel Petitions to someone by E-mail Share EPAct Transportation Regulatory Activities: Alternative Fuel Petitions on Facebook Tweet about EPAct Transportation Regulatory Activities: Alternative Fuel Petitions on Twitter Bookmark EPAct Transportation Regulatory Activities: Alternative Fuel Petitions on Google Bookmark EPAct Transportation Regulatory Activities: Alternative Fuel Petitions on Delicious Rank EPAct Transportation Regulatory Activities: Alternative Fuel Petitions on Digg Find More places to share EPAct Transportation Regulatory Activities: Alternative Fuel Petitions on AddThis.com... Home About Covered Fleets Compliance Methods Alternative Fuel Petitions Resources Alternative Fuel Petitions Section 301(2) of the Energy Policy Act of 1992 (EPAct 1992) defines

356

Regulatory Resources for Process Contaminants (3-MCPD)  

Science Conference Proceedings (OSTI)

Regulatory information and references for 3-MCPD(3-Monochloropropane-1,2-diol )process contaminants. Regulatory Resources for Process Contaminants (3-MCPD) 3-MCPD 2-diol 3-MCPD 3-MCPD Esters 3-monochloropropane-1 acid analysis aocs april articles certifi

357

Revision 2 Yucca Mountain Review Plan  

E-Print Network (OSTI)

The Yucca Mountain Review Plan provides guidance for the U.S. Nuclear Regulatory Commission staff to evaluate a U.S. Department of Energy license application for a geologic repository. It is not a regulation and does not impose regulatory requirements. The licensing criteria are contained in the U.S. Code of Federal Regulations (CFR) Title 10, Part 63

unknown authors

2003-01-01T23:59:59.000Z

358

Geothermal Regulatory Roadmap featured on NREL Now | OpenEI Community  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap featured on NREL Now Geothermal Regulatory Roadmap featured on NREL Now Home > Groups > OpenEI Community Central Graham7781's picture Submitted by Graham7781(2002) Super contributor 5 August, 2013 - 13:18 geothermal NREL OpenEI regulatory roadmap Navigating the complex system of federal and state regulations to secure project approvals is one of the biggest hurdles geothermal power developers face-but not if they've got a map outlining every twist and turn. DOE's Geothermal Regulatory Roadmap, a new online tool for agency, industry, and policymaker use, helps developers make it through regulatory requirements at every level of government more easily to deploy geothermal energy projects. Designed to help strengthen collaboration between federal and state agencies, the roadmap should also speed the review of proposed projects and

359

Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Regulatory Policies Act of 1978 (PURPA) as Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) - List of Covered Electric Utilities. Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) - List of Covered Electric Utilities. Under Title I of the Public Utility Regulatory Policies Act of 1978 (PURPA), the U.S. Department of Energy (DOE) is required to publish a list identifying each electric utility that Title I applies to. [See PURPA SEC. 102(c).] The following list is being released by DOE in August 2006 for review and comment by state public utility commissions. Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) - List of Covered Electric

360

Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Regulatory Policies Act of 1978 (PURPA) as Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) -List of Covered Electric Utilities - 2006 Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) -List of Covered Electric Utilities - 2006 Under Title I of the Public Utility Regulatory Policies Act of 1978 (PURPA), the U.S. Department of Energy (DOE) is required to publish a list identifying each electric utility that Title I applies to. [See PURPA SEC. 102(c).] The following list is being released by DOE in August 2006 for review and comment by state public utility commissions. Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) - List of Covered Electric

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Regulatory Perspective on the Use of Cementitious ...  

United States Nuclear Regulatory Commission 1 ... - Development of accelerated laboratory-scale test methods. - Compilation of a database of ...

362

SRS Tank Closure Regulatory Developments  

Order 435.1 and State-required documents are prepared and in review • Tank-specific documents for Tanks 18, 19, 5 and ... Solids Volume (gal) Solids ...

363

Nuclear Safety Regulatory Assistance Reviews | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 13, 2008 June 13, 2008 Preliminary Notice of Violation, Babcock & Wilcox Teclmical Services Y-12, LLC - NEA-2008-01 Preliminary Notice of Violation issued to Babcock & Wilcox Technical Services Y-12, LLC, related to a Uranium Chip Fire at the Y-12 National Security Complex March 17, 2008 Enforcement Letter , Bechtel BWXT Idaho LLC - March 17, 2008 Enforcement Letter issued to Bechtel BWXT Idaho, LLC, related to Procedural Adequacy and Adherence in Transuranic Waste Characterization and Shipping at the Idaho National Laboratory January 4, 2008 Special Report Order, Los Alamos National Security, LLC - January 4, 2008 Issued to Los Alamos National Security, LLC related to Glovebox Activities at TA-55 and Chemistry and Metallurgy Research Facilities at the Los Alamos

364

Nuclear Safety Regulatory Assistance Reviews | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 16, 1998 November 16, 1998 Preliminary Notice of Violation, Babcock & Wilcox of Ohio, Inc - EA-98-12 Preliminary Notice of Violation issued to Babcock & Wilcox of Ohio, Inc., related to Radiological Work Controls and Bioassay Program Deficiencies at the Mound Site, November 16, 1998 (EA-98-12) September 21, 1998 Preliminary Notice of Violation, Los Alamos National Laboratory - EA-98-10 Preliminary Notice of Violation issued to the University of California related to Multiple Events involving Radiation Protection and Quality Control Requirements at the Chemistry and Metallurgy Research Facility at the Los Alamos National Laboratory, (EA-98-10) September 21, 1998 Preliminary Notice of Violation, MK-Ferguson of Oak Ridge Company - EA-98-08 Preliminary Notice of Violation issued to MK-Ferguson of Oak Ridge Company,

365

Nuclear Safety Regulatory Assistance Reviews | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 14, 2002 August 14, 2002 Preliminary Notice of Violation, Fluor Hanford, Incorporated - EA-2002-03 Preliminary Notice of Violation issued to Fluor Hanford, Incorporated, related to Quality Assurance issues at the Hanford Site. June 19, 2002 Enforcement Letter, Kaiser-Hill Company, L.L.C. - June 19, 2002 Enforcement Letter issued to Kaiser-Hill Company, LLC related to Unplanned Radioactive Material Uptakes at the Rocky Flats Environmental Technology Site October 22, 2001 Special Report Order, CH2M Hill Hanford Group, Inc. - October 22, 2001 Special Report Order issued to CH2M Hill Hanford Group, Inc., related to Multiple Nuclear Safety Issues at the Hanford Site October 9, 2001 Enforcement Letter, LANL - October 9, 2001 Enforcement Letter issued to Los Alamos National Laboratory related to

366

Nuclear Safety Regulatory Assistance Reviews | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 22, 2013 July 22, 2013 Enforcement Letter, NEL-2013-03 Issued to Lawrence Livermore National Security, LLC related to Programmatic Deficiencies in the Software Quality Assurance Program at the Lawrence Livermore National Laboratory February 12, 2013 Enforcement Letter, NEL-2013-02 Issued to Los Alamos National Security, LLC related to a Radiological Contamination Event at the Los Alamos Neutron Science Center at Los Alamos National Laboratory January 7, 2013 Enforcement Letter, NEL-2013-01 Issued to B&W Pantex, LLC related to the Conduct of Nuclear Explosive Operations at the Pantex Plant October 23, 2012 Enforcement Letter, Controlled Power Company - WEL-2012-02 Enforcement Letter issued to Controlled Power Company related to an Electrical Shock Near Miss that occurred in the Radiological Laboratory

367

Identification and Characterization of Prokaryotic Regulatory Networks: Final Report  

Science Conference Proceedings (OSTI)

We have completed our characterization of both the transcriptional regulatory network and post-transcriptional regulatory motifs in Shewanella.

Gary D Stormo

2012-10-05T23:59:59.000Z

368

MELCOR Peer Review  

Science Conference Proceedings (OSTI)

MELCOR is a fully integrated, engineering-level computer code that models the progression of severe accidents in light water reactor nuclear power plants. The newest version of MELCOR is Version 1.8.1, July 1991. MELCOR development has reached the point that the United States Nuclear Regulatory Commission sponsored a broad technical review by recognized experts to determine or confirm the technical adequacy of the code for the serious and complex analyses it is expected to perform. For this purpose, an eight-member MELCOR Peer Review Committee was organized. The Committee has completed its review of the MELCOR code: the review process and findings of the MELCOR Peer Review Committee are documented in this report. The Committee has determined that recommendations in five areas are appropriate: (1) MELCOR numerics, (2) models missing from MELCOR Version 1.8.1, (3) existing MELCOR models needing revision, (4) the need for expanded MELCOR assessment, and (5) documentation.

Boyack, B.E. [Los Alamos National Lab., NM (United States); Dhir, V.K. [Santa Monica, CA. (United States); Gieseke, J.A. [Battelle, Columbus, OH (United States); Haste, T.J. [AEA Technology, Winfrith (United Kingdom); Kenton, M.A. [Gabor, Kenton and Associates, Inc., Westmont, IL (United States); Khatib-Rahbar, M. [Energy Research, Inc., Rockville, MD (United States); Leonard, M.T. [Science Applications International Corp., Wolfheze (Netherlands); Viskanta, R. [Purdue Univ., Lafayette, IN (United States). Heat Transfer Lab.

1992-03-01T23:59:59.000Z

369

Managing Carbon Regulatory Risk in Utility Resource Planning: Current  

NLE Websites -- All DOE Office Websites (Extended Search)

Managing Carbon Regulatory Risk in Utility Resource Planning: Current Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States Title Managing Carbon Regulatory Risk in Utility Resource Planning: Current Practices in the Western United States Publication Type Report Year of Publication 2009 Authors Barbose, Galen L., Ryan H. Wiser, Amol Phadke, and Charles A. Goldman Pagination 28 Date Published 03/2009 Publisher LBNL City Berkeley Keywords carbon emissions, electric utilities, electricity markets and policy group, energy analysis and environmental impacts department, power system planning Abstract Concerns about global climate change have substantially increased the likelihood that future policy will seek to minimize carbon dioxide emissions. As such, even today, electric utilities are making resource planning and investment decisions that consider the possible implications of these future carbon regulations. In this article, we examine the manner in which utilities assess the financial risks associated with future carbon regulations within their long-term resource plans. We base our analysis on a review of the most recent resource plans filed by fifteen electric utilities in the Western United States. Virtually all of these utilities made some effort to quantitatively evaluate the potential cost of future carbon regulations when analyzing alternate supply- and demandside resource options for meeting customer load. Even without Federal climate regulation in the U.S., the prospect of that regulation is already having an impact on utility decision-making and resource choices. That said, the methods and assumptions used by utilities to analyze carbon regulatory risk, and the impact of that analysis on their choice of a particular resource strategy, vary considerably, revealing a number of opportunities for analytic improvement. Though our review focuses on a subset of U.S. electric utilities, this work holds implications for all electric utilities and energy policymakers

370

Reliability and the Federal Energy Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and the Federal Reliability and the Federal and the Federal Reliability and the Federal Energy Regulatory Energy Regulatory Commission Commission Michael Peters Michael Peters Energy Infrastructure & Cyber Security Advisor Energy Infrastructure & Cyber Security Advisor Federal Energy Regulatory Commission Federal Energy Regulatory Commission 202 202 - - 502 502 - - 8461 8461 Michael.Peters@FERC.GOV Michael.Peters@FERC.GOV The views expressed in this The views expressed in this presentation do not represent the presentation do not represent the views of the Federal Energy views of the Federal Energy Regulatory Commission or the United Regulatory Commission or the United States. States. These views are the personal opinion These views are the personal opinion of Mike Peters!!!! of Mike Peters!!!! â˜ș â˜ș â˜ș â˜ș â˜ș â˜ș

371

Environmental regulatory update table, March 1989  

Science Conference Proceedings (OSTI)

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlberg, L.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

1989-04-01T23:59:59.000Z

372

Environmental Regulatory Update Table, December 1989  

Science Conference Proceedings (OSTI)

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlbert, L.M.; Langston, M.E. (Tennessee Univ., Knoxville, TN (USA)); Nikbakht, A.; Salk, M.S. (Oak Ridge National Lab., TN (USA))

1990-01-01T23:59:59.000Z

373

Environmental Regulatory Update Table, April 1989  

SciTech Connect

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlberg, L.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

1989-05-01T23:59:59.000Z

374

Environmental Regulatory Update Table, September 1991  

SciTech Connect

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

1991-10-01T23:59:59.000Z

375

Vehicle Technologies Office: EPAct Transportation Regulatory Activities  

NLE Websites -- All DOE Office Websites (Extended Search)

EPAct Transportation Regulatory Activities EPAct Transportation Regulatory Activities The U.S. Department of Energy's (DOE) Vehicle Technologies Office manages several Energy Policy Act (EPAct) transportation regulatory activities that aim to reduce U.S. petroleum consumption by building a core market for alternative fuel vehicles (AFVs). EPAct directed DOE to develop the Alternative Fuel Transportation Program to manage regulatory activities, including the State and Alternative Fuel Provider Fleet Program, which requires covered fleets to reduce petroleum consumption through one of two compliance methods. Features Discover how National Grid meets EPAct requirements Read the latest newsletter Learn about Alternative Compliance Quick Links Standard Compliance Reporting Standard Compliance Alternative Compliance

376

Coal Mining Regulatory and Reclamation Act (Massachusetts) |...  

Open Energy Info (EERE)

Data Page Edit with form History Share this page on Facebook icon Twitter icon Coal Mining Regulatory and Reclamation Act (Massachusetts) This is the approved revision of...

377

Other Regulatory Efforts | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012 Section 1222 of the Energy Policy Act 2005 International Electricity Regulation Presidential Permits Export Authorizations Pending Applications NEPA Other Regulatory...

378

IEP - Carbon Dioxide: Regulatory Drivers  

NLE Websites -- All DOE Office Websites (Extended Search)

IEP - Carbon Dioxide (CO2) Regulatory Drivers In July 7, 2009 testimony before the U.S. Senate Committee on Environment and Public Works, Secretary of Energy Steven Chu made the following statements:1 "...Overwhelming scientific evidence shows that carbon dioxide from human activity has increased the atmospheric level of CO2 by roughly 40 percent, a level one- third higher than any time in the last 800,000 years. There is also a consensus that CO2 and other greenhouse gas emissions have caused our planet to change. Already, we have seen the loss of about half of the summer arctic polar ice cap since the 1950s, a dramatically accelerating rise in sea level, and the loss of over two thousand cubic miles of glacial ice, not on geological time scales but over a mere hundred years.

379

United States Nuclear Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

qU oSoLTJRC qU oSoLTJRC United States Nuclear Regulatory Commission Protecting People and the Environment NUREG-1872, Vol. 2 HudcD [jE©wftamfsĂœĂœpc Wafm(M oran EA Office of New Reactors AVAILABILITY OF REFERENCE MATERIALS IN NRC PUBLICATIONS NRC Reference Material As of November 1999, you may electronically access NUREG-series publications and other NRC records at NRC's Public Electronic Reading Room at http:t/www.nrc..ov/reading-rm.html. Publicly released records include, to name a few, NUREG-series publications; Federal Register notices; applicant, licensee, and vendor documents and correspondence; NRC correspondence and internal memoranda; bulletins and information notices; inspection and investigative reports; licensee event reports; and Commission papers and their attachments.

380

UNITED STATES NUCLEAR REGULATORY COMMISSION  

Office of Legacy Management (LM)

WASHINGTON, 0. C. 20555 WASHINGTON, 0. C. 20555 AUG i 3 1979 ,,~---Y--*. FCAF:Wi3 )I 70-364 : i: SNM-414,jAmendment No. 3 --A Babcock and Wilcox Company Nuclear Materials Division ATTN: Mr. Michael A. Austin Manager, Technical Control 609 North Warren Avenue Apollo, Pennsylvania 15613 Gentiemen: (1 i' \ (. \ In accordance with your application dated June 18, 1979, and pursuant to Title 10, Code of Federal Regulations, Part 70, Materials License SNM-414 is hereby amended to: 1. Delete the function of the Regulatory Projects Coordinator, and 2. Alter the experience requirements for the function of Licensing and Nuclear Safety Specialist. Replacement pages for the license and condition section of the application are attached. Included are changes to License SNM-414 pages to reflect

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

GRR/Elements/18-FD-a.16 - Post-Construction Completion: Review...  

Open Energy Info (EERE)

GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 18-FD-a.16 - Post-Construction Completion: Review of Cleanup Effort to Determine Mitigation Effect...

382

U.S. DEPARTMENT OF ENERGY'S REPLY BRIEF IN SUPPORT OF REVIEW...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPLY BRIEF IN SUPPORT OF REVIEW AND REVERSAL OF THE Nuclear Regulatory Commission's Atomic Safety and Licensing Board's (BOARD) RULING ON THE MOTION TO WITHDRAW. Brief submitted...

383

Thoughts after the Geothermal Regulatory Roadmap Advisory Meeting | OpenEI  

Open Energy Info (EERE)

Thoughts after the Geothermal Regulatory Roadmap Advisory Meeting Thoughts after the Geothermal Regulatory Roadmap Advisory Meeting Home > Groups > Geothermal Regulatory Roadmap Twnrel's picture Submitted by Twnrel(12) Member 23 July, 2012 - 11:51 meetings + advisory group The most recent meeting of the Advisory Group occurred on July 19th. This was a big event for the team, as it was the first real project review meeting since we kicked off the meetings to develop flow charts. I was really happy with the meeting outcomes. We had a lot of constructive feedback from the group, and the consensus that the project is on a good course continues to build over time. Developing the Geothermal Regulatory Roadmap requires a lot of work from many people in many organizations. I wish there was a way to thank each of you individually, but please know that we appreciate your efforts.

384

Strategic use of incentive mechanisms as a regulatory policy tool  

Science Conference Proceedings (OSTI)

In many quarters, traditional cost-plus regulation has come to be perceived as a failure. This perception is, in part, the result of a conjunction of events, changing philosophy, and measurable performance problems in the electric utility industry. Risk, competition and prudence issues will dominate the regulatory agenda in the 1990s. The experience being gained through application of alternative regulation in the telecommunications industry will have a significant impact on the willingness of regulators to experiment with new incentive approaches in the electric and natural gas industries. If the goals of a program are well specified, and if the incentive mechanism is designed in the appropriate fashion, incentives can play a major role in least-cost planning programs and in more accommodating regulatory environments. Significant attention has been given to alternative incentive programs in the electric power industry. The purpose of this paper is not to review the extensive literature on incentives, but rather to provide a nuts and bolts, common-sense analysis of the strategic value of incentive mechanisms as a regulatory policy. 14 refs., 1 fig., 2 tabs.

McDermott, K.A. (Illinois Commerce Commission, Springfield (United States)); South, D.W.; Bailey, K.A. (Argonne National Lab., IL (United States))

1992-12-01T23:59:59.000Z

385

Compendium of regulatory requirements governing underground injection of drilling waste.  

Science Conference Proceedings (OSTI)

Large quantities of waste are produced when oil and gas wells are drilled. The two primary types of drilling wastes include used drilling fluids (commonly referred to as muds), which serve a variety of functions when wells are drilled, and drill cuttings (rock particles ground up by the drill bit). Some oil-based and synthetic-based muds are recycled; other such muds, however, and nearly all water-based muds, are disposed of. Numerous methods are employed to manage drilling wastes, including burial of drilling pit contents, land spreading, thermal processes, bioremediation, treatment and reuse, and several types of injection processes. This report provides a comprehensive compendium of the regulatory requirements governing the injection processes used for disposing of drilling wastes; in particular, for a process referred to in this report as slurry injection. The report consists of a narrative discussion of the regulatory requirements and practices for each of the oil- and gas-producing states, a table summarizing the types of injection processes authorized in each state, and an appendix that contains the text of many of the relevant state regulations and policies. The material included in the report was derived primarily from a review of state regulations and from interviews with state oil and gas regulatory officials.

Puder, M. G.; Bryson, B.; Veil, J. A.

2002-11-08T23:59:59.000Z

386

By E-Mail Daniel Cohen Assistant General Counsel for Legislation, Regulation, and Energy Efficiency  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 19, 2012 June 19, 2012 By E-Mail Daniel Cohen Assistant General Counsel for Legislation, Regulation, and Energy Efficiency U.S. Department of Energy Office of the General Counsel 1000 Independence Ave., SW Washington, D.C. 20585 Regulatory.Review@hq.doe.gov Re: Regulatory Burden RFI Dear Mr. Cohen: The Association of Home Appliance Manufacturers (AHAM) respectfully submits the following comments to the Department of Energy (DOE) on its Regulatory Burden RFI, 77 Fed. Reg. 28518 (May 15, 2012). AHAM represents manufacturers of major, portable and floor care home appliances, and suppliers to the industry. AHAM's more than 150 members employ tens of thousands of people in the U.S. and produce more than 95% of the household appliances shipped for sale within the

387

Interim On-Site Storage of Low Level Waste: Volume 1: Licensing and Regulatory Issues  

Science Conference Proceedings (OSTI)

This report is an all-inclusive resource guide for evaluating a utility's on-site storage licensing requirements. Specifically, the report offers an extensive review of licensing and regulatory documents related to on-site storage of low level waste as well as a methodology for evaluating on-site storage licensing issues.

1992-06-01T23:59:59.000Z

388

Nuclear Regulatory Commission's Integrated Strategy for Spent Fuel Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NRC's NRC's Integrated Strategy for NRC s Integrated Strategy for Spent Fuel Management Earl Easton 1 U.S. Nuclear Regulatory Commission May 25, 2010 Road to Yucca Mountain * 20+ years of preparation for the licensing i review * DOE application received in June 2008 and accepted for review in September 2008 * President Obama pursues alternatives to Yucca Mountain * DOE motion to withdraw in March 2010 2 * DOE motion to withdraw in March 2010 * Blue Ribbon Commission on America's Nuclear Future 2 Growing Spent Fuel Inventory Cumulative Used Nuclear Fuel Scenarios 50,000 100,000 150,000 200,000 250,000 Metric Tons 3 - 50,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Year Reference: Crozat, March 2010 Integrated Strategy * In response to the evolving national debate on spent fuel management strategy, NRC initiated a number of actions:

389

Potential effects of environmental regulatory procedures on geothermal development  

DOE Green Energy (OSTI)

The potential effects of several types of applicable environmental regulatory procedures on geothermal development were assessed, and particular problem areas were identified. The possible impact of procedures adopted pursuant to the following Federal statutes were analyzed: Clean Air Act; Clean Water Act; Safe Drinking Water Act; and Resource Conservation and Recovery Act. State regulations applicable, or potentially applicable, to geothermal facilities were also reviewed to determine: permit information requirements; pre-permit air or water quality monitoring requirements; effect of mandated time frames for permit approval; and potential for exemption of small facilities. The regulations of the following states were covered in the review: Alaska; Arizona; California; Colorado; Hawaii; Idaho; Montana; Nevada; New Mexico; Oregon; Utah; Washington; and Wyoming. (MHR)

Beeland, G.V.; Boies, D.B.

1981-01-01T23:59:59.000Z

390

Ex parte discussion clarifying NEMA's comments | Department of...  

NLE Websites -- All DOE Office Websites (Extended Search)

More Documents & Publications NEMA Comments on Reducing Regulatory Burden National Electrical Manufacturers Association (NEMA) Response to Smart Grid RFI Audit Report: OAS-M-13-05...

391

Chemical Cleaning Program Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chemical Cleaning Chemical Cleaning Program Review Neil Davis Deputy Program Manager Waste Removal & Tank Closure July 29, 2009 SRR-STI-2009-00464 2 Contents Regulatory drivers Process overview Preliminary results Lessons learned Path forward 3 Regulatory Drivers The Federal Facilities Agreement establishes milestones for the removal of bulk waste and closure of each non-compliant tank Per the Dispute Resolution: - "DOE shall complete operational closure of Tanks 19 and 18 by 12/31/2012" - "DOE shall complete operational closure of 4 tanks by 9/30/2015" SRR intention to close 4 tanks by 9/30/2010, or as soon as possible Tanks 5 & 6 will be 2 of the 4 tanks 4 Tank Closure Process Bulk Waste Removal Mechanical Heel Removal Chemical Cleaning Annulus

392

Department of Energy and Nuclear Regulatory Commission Increase...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership Department of Energy and Nuclear Regulatory Commission Increase Cooperation to...

393

Energy Praises the Nuclear Regulatory Commission Approval of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the...

394

Business Case Slide 34: Regulatory Constraints Analysis (ANL...  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Constraints Analysis (ANL) - Program Focus Program focus ANL will be preparing a risk analysis and regulatory plan for a specific case: use of DU in catalysts Enhance...

395

Changes related to "Coal Mining Regulatory and Reclamation Act...  

Open Energy Info (EERE)

Special page Share this page on Facebook icon Twitter icon Changes related to "Coal Mining Regulatory and Reclamation Act (Massachusetts)" Coal Mining Regulatory and...

396

Pages that link to "Coal Mining Regulatory and Reclamation Act...  

Open Energy Info (EERE)

Edit History Share this page on Facebook icon Twitter icon Pages that link to "Coal Mining Regulatory and Reclamation Act (Massachusetts)" Coal Mining Regulatory and...

397

Book Reviews Book Reviews*  

E-Print Network (OSTI)

Book Reviews Book Reviews* J. Am. Chem. SOC.,Vol. 108, No. 17, 1986 5313 Handbook of Gaussian Basis + 556 pp. $85.00. This book is a collection of chapters authored by individuals or groups experienced. The present book, dealing with the latter topic, is one of the only extensive intro- ductions of which I am

Pines, Alexander

398

Regulatory Commission of Alaska | Open Energy Information  

Open Energy Info (EERE)

Regulatory Commission of Alaska Regulatory Commission of Alaska Jump to: navigation, search Logo: Regulatory Commission of Alaska Name Regulatory Commission of Alaska Address 701 West Eight Ave., Suite 300 Place Anchorage, Alaska Zip 99501-3469 Phone number 907-276-6222 Website http://rca.alaska.gov/RCAWeb/h Coordinates 61.2143463°, -149.8931523° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":61.2143463,"lon":-149.8931523,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

399

Regulatory Considerations for Developing Distributed Generation Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regulatory Considerations for Developing Distributed Generation Regulatory Considerations for Developing Distributed Generation Projects Webinar Regulatory Considerations for Developing Distributed Generation Projects Webinar May 23, 2012 11:30AM to 1:00PM MDT The purpose of this webinar is to educate NRECA and APPA members, Tribes, and federal energy managers about a few of the regulatory issues that should be considered in developing business plans for distributed generation projects. This webinar is sponsored by the DOE Office of Indian Energy Policy and Programs, DOE Energy Efficiency and Renewable Energy Tribal Energy Program, Western Area Power Administration, DOE Federal Energy Management Program, DOE Office of Electricity Delivery and Energy Reliability, National Rural Electric Cooperative Association, and the American Public Power

400

EIA - Natural Gas Pipeline Network - Regulatory Authorities  

U.S. Energy Information Administration (EIA) Indexed Site

Regulatory Authorities Regulatory Authorities About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates U.S. Natural Gas Regulatory Authorities Beginning | Regulations Today | Coordinating Agencies | Regulation of Mergers and Acquisitions Beginning of Industry Restructuring In April 1992, the Federal Energy Regulatory Commission (FERC) issued its Order 636 and transformed the interstate natural gas transportation segment of the industry forever. Under it, interstate natural gas pipeline companies were required to restructure their operations by November 1993 and split-off any non-regulated merchant (sales) functions from their regulated transportation functions. This new requirement meant that interstate natural gas pipeline companies were allowed to only transport natural gas for their customers. The restructuring process and subsequent operations have been supervised closely by FERC and have led to extensive changes throughout the interstate natural gas transportation segment which have impacted other segments of the industry as well.

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Federal Energy Regulatory Commission | Open Energy Information  

Open Energy Info (EERE)

Energy Regulatory Commission Energy Regulatory Commission Jump to: navigation, search Logo: Federal Energy Regulatory Commission Name Federal Energy Regulatory Commission Address 888 First Street, N.E. Place Washington, District of Columbia Zip 20426 Phone number 1-866-208-3676 Website http://www.ferc.gov/contact-us Coordinates 38.90145°, -77.006248° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.90145,"lon":-77.006248,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

402

Legal and Regulatory | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Legal and Regulatory Legal and Regulatory Legal and Regulatory Below are resources for Tribes on legal and regulatory issues. A Guide to Community Solar: Utility, Private, and Non-Profit Project Development A resource for community solar project development aimed at community organizers, solar advocates, government officials, and utility managers. Provides information on various community solar project models (utility-sponsored, special purpose entities, non-profits), state policies that support community solar projects (group billing, virtual net metering, joint ownership), and tax policies and incentives. Source: U.S. Department of Energy. An Introduction to Geothermal Permitting This guide tracks the geothermal permitting process through multiple levels, addressing such issues as the importance of where the geothermal

403

Regulatory Considerations for Developing Distributed Generation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Generation Projects Webinar Regulatory Considerations for Developing Distributed Generation Projects Webinar May 23, 2012 11:30AM to 1:00PM MDT The purpose of this webinar...

404

Evolution and statistics of biological regulatory networks  

E-Print Network (OSTI)

In this thesis, I study the process of evolution of the gene regulatory network in Escherichia coli. First, I characterize the portion of the network that has been documented, and then I simulate growth of the network. In ...

Chandalia, Juhi Kiran, 1979-

2005-01-01T23:59:59.000Z

405

NEMA Comments on Reducing Regulatory Burden  

Energy.gov (U.S. Department of Energy (DOE))

The National Electrical Manufacturers Association (NEMA) thanks you for the opportunity to provide comments on the Department of Energy’s efforts to make its regulatory program more effective and...

406

Analysis of Regulatory Guidance for Health Monitoring  

Science Conference Proceedings (OSTI)

The purpose of this study was to assess the connection between current FAA regulations and the incorporation of Health Management (HM) systems into commercial aircraft. To address the overall objectives ARINC (1) investigated FAA regulatory guidance, ...

Munns Thomas E.; Beard Richard E.; Culp Aubrey M.; Murphy Dennis A.; Kent Renee M.

2000-12-01T23:59:59.000Z

407

Regulatory Process for Decommissioning Nuclear Power Reactors  

Science Conference Proceedings (OSTI)

The NRC revised decommissioning rule 10 CFR 50.82 in 1996 to make significant changes in the regulatory process for nuclear power plant licensees. This report provides a summary of ongoing federal agency and industry activities. It also describes the regulatory requirements applicable, or no longer applicable, to nuclear power plants at the time of permanent shutdown through the early decommissioning stage. The report describes the major components of a typical decommissioning plan, and provides industry...

1998-03-26T23:59:59.000Z

408

ORISE: Scientific Peer Review Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Planning Woman participating in a peer review The Oak Ridge Institute for Science and Education (ORISE) begins the peer review planning process by analyzing the purpose of the funds to be distributed. Because each agency's needs are different, ORISE then designs and manages a flexible, scientific peer review process that can be modified based on a sponsor's regulatory, policy and operational requirements. ORISE's existing tools and systems, and knowledge of reviewing proposals from a government agency perspective, are helping to promote the quality and credibility of scientific information and funded research. ORISE's peer review planning process ensures each objective review is completed on schedule, within budget and with a high degree of process integrity.

409

Book reviews  

Science Conference Proceedings (OSTI)

If you are interested in reviewing books for intelligence, please contact book review editor Karen Sutherland at intelligence_book-reviews@acm.org.

Karen Sutherland

2001-12-01T23:59:59.000Z

410

KWOC (Key-Word-Out-of-Context) Index of US Nuclear Regulatory Commission Regulatory Guide Series  

SciTech Connect

To meet the objectives of the program funded by the Department of Energy (DOE)-Nuclear Energy (NE) Technology Support Programs, the Performance Assurance Project Office (PAPO) administers a Performance Assurance Information Program that collects, compiles, and distributes program-related information, reports, and publications for the benefit of the DOE-NE program participants. THE KWOC Index of US Nuclear Regulatory Commission Regulatory Guide Series'' is prepared as an aid in searching for specific topics in the US Nuclear Regulatory Commission, Regulatory Guide Series.

Jennings, S.D.

1990-04-01T23:59:59.000Z

411

NRC Regulatory Issue Summary on EPRI Digital Licensing Guideline, TR-102348 (NEI 01-01)  

Science Conference Proceedings (OSTI)

The U.S. Nuclear Regulatory Commission (NRC) issued this regulatory issue summary (RIS) to announce that the NRC has reviewed the EPRI / Nuclear Energy Institute (NEI) Joint Task Force Report entitled "Guideline on Licensing Digital Upgrades: EPRI TR-102348, Revision 1, NEI 01-01: A Revision of EPRI TR-102348 To Reflect Changes to the 10 CFR 50.59 Rule," and has endorsed the report for use as guidance in designing and implementing digital upgrades to instrumentation and control systems. The attached safe...

2004-01-16T23:59:59.000Z

412

Clinch River Breeder Reactor: an assessment of need for power and regulatory issues  

SciTech Connect

The purpose of this report is to present the results of a research effort designed to assist the US Department of Energy in: (1) reviewing the need for power from the Clinch River Breeder Reactor (CRBR) in the Southeastern Electric Reliability Council (SERC) region, not including Florida, and (2) isolating specific regulatory and institutional issues and physical transmission capacities that may constrain the market for CRBR power. A review of existing electric power wheeling arrangements in the Southeast and specific federal and state regulatory obstacles that may affect power sales from the CRBR was undertaken. This review was a contributing factor to a decision to target the service territory to SERC-less Florida.

Hamblin, D.M.; Tepel, R.C.; Bjornstad, D.J.; Hill, L.J.; Cantor, R.A.; Carroll, P.J.; Cohn, S.M.; Hadder, G.R.; Holcomb, B.D.; Johnson, K.E.

1983-09-01T23:59:59.000Z

413

Distributed Resources Strategic Review: Market Drivers Impacting Future Business Prospects  

Science Conference Proceedings (OSTI)

This strategic review analyzes and interprets the impact of utility industry restructuring and regulatory reform on the future market for distributed generation (DG) and, more broadly, distributed resources (DR).

1998-05-21T23:59:59.000Z

414

DOE Petitions for NRC Review in Yucca Mountain Proceeding  

Energy.gov (U.S. Department of Energy (DOE))

The United States Department of Energy today filed with the Nuclear Regulatory Commission a petition requesting that the Commission review and reverse an order by the NRC’s Atomic Safety and...

415

Training Program EHS 0611 ~ Universal Waste Regulatory Training  

NLE Websites -- All DOE Office Websites (Extended Search)

Environment, Health, & Safety Training Program EHS 0611 Universal Waste Regulatory Training Course Syllabus Subject...

416

NETL: IEP - Air Quality Research: Regulatory Drivers  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Drivers Regulatory Drivers DOE/NETL’s Air Quality Research Program is in direct response to the need to ensure that fossil-fuel-fired power systems continue to meet current and future environmental requirements. Specific environmental regulatory requirements driving this research are briefly summarized below: I. Clean Air Act (Including 1990 Amendments) Title I - Air Pollution Prevention and Control Part A - Air Quality and Emission Limitations Sect. 109 - National Ambient Air Quality Standards In July 1997 EPA promulgated new standards for particulate matter finer than 2.5 micrometers (PM2.5) and revised the ambient ozone standards. Sect. 111 - Standards of Performance for New Stationary Sources Part C - Prevention of Significant Deterioration of Air Quality

417

IEP - Advanced NOx Emissions Control: Regulatory Drivers  

NLE Websites -- All DOE Office Websites (Extended Search)

IEP - Advanced NOx Emissions Control Regulatory Drivers Regulatory Drivers for Existing Coal-Fired Power Plants Regulatory and legislative requirements have predominantly driven the need to develop NOx control technologies for existing coal-fired power plants. The first driver was the Title IV acid rain program, established through the 1990 Clean Air Act Amendments (CAAA). This program included a two-phase strategy to reduce NOx emissions from coal-fired power plants – Phase I started January 1, 1996 and Phase II started January 1, 2000. The Title IV NOx program was implemented through unit-specific NOx emission rate limits ranging from 0.40 to 0.86 lb/MMBtu depending on the type of boiler/burner configuration and based on application of LNB technology.

418

Packaging Review Guide for Reviewing Safety Analysis Reports for Packagings  

SciTech Connect

This Packaging Review Guide (PRG) provides guidance for Department of Energy (DOE) review and approval of packagings to transport fissile and Type B quantities of radioactive material. It fulfills, in part, the requirements of DOE Order 460.1B for the Headquarters Certifying Official to establish standards and to provide guidance for the preparation of Safety Analysis Reports for Packagings (SARPs). This PRG is intended for use by the Headquarters Certifying Official and his or her review staff, DOE Secretarial offices, operations/field offices, and applicants for DOE packaging approval. This PRG is generally organized at the section level in a format similar to that recommended in Regulatory Guide 7.9 (RG 7.9). One notable exception is the addition of Section 9 (Quality Assurance), which is not included as a separate chapter in RG 7.9. Within each section, this PRG addresses the technical and regulatory bases for the review, the manner in which the review is accomplished, and findings that are generally applicable for a package that meets the approval standards. This Packaging Review Guide (PRG) provides guidance for DOE review and approval of packagings to transport fissile and Type B quantities of radioactive material. It fulfills, in part, the requirements of DOE O 460.1B for the Headquarters Certifying Official to establish standards and to provide guidance for the preparation of Safety Analysis Reports for Packagings (SARPs). This PRG is intended for use by the Headquarters Certifying Official and his review staff, DOE Secretarial offices, operations/field offices, and applicants for DOE packaging approval. The primary objectives of this PRG are to: (1) Summarize the regulatory requirements for package approval; (2) Describe the technical review procedures by which DOE determines that these requirements have been satisfied; (3) Establish and maintain the quality and uniformity of reviews; (4) Define the base from which to evaluate proposed changes in scope and requirements of reviews; and (5) Provide the above information to DOE organizations, contractors, other government agencies, and interested members of the general public. This PRG was originally published in September 1987. Revision 1, issued in October 1988, added new review sections on quality assurance and penetrations through the containment boundary, along with a few other items. Revision 2 was published October 1999. Revision 3 of this PRG is a complete update, and supersedes Revision 2 in its entirety.

DiSabatino, A; Biswas, D; DeMicco, M; Fisher, L E; Hafner, R; Haslam, J; Mok, G; Patel, C; Russell, E

2007-04-12T23:59:59.000Z

419

Early Site Permit Demonstration Program: Regulatory criteria evaluation report  

Science Conference Proceedings (OSTI)

The primary objective of the ESPDP is to demonstrate successfully the use of 10CFR52 to obtain ESPs for one or more US sites for one (or more) ALWR nuclear power plants. It is anticipated that preparation of the ESP application and interaction with NRC during the application review process will result not only in an ESP for the applicant(s) but also in the development of criteria and definition of processes, setting the precedent that facilitates ESPs for subsequent ESP applications. Because siting regulatory processes and acceptance criteria are contained in over 100 separate documents, comprehensive licensing and technical reviews were performed to establish whether the requirements and documentation are self-consistent, whether the acceptance criteria are sufficiently well-defined and clear, and whether the licensing process leading to the issuance of an ESP is unambiguously specified. The results of the technical and licensing evaluations are presented in this report. The purpose, background, and organization of the ESPDP is delineated in Section 1. Section 11 contains flowcharts defining siting application requirements, environmental report requirements, and emergency planning/preparedness requirements for ALWRS. The licensing and technical review results are presented in Section III.

Not Available

1993-03-01T23:59:59.000Z

420

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ocean Renewable Power Company Maine, LLC Project No. 12711-005 Ocean Renewable Power Company Maine, LLC Project No. 12711-005 NOTICE OF AVAILABILITY OF ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED COBSCOOK BAY TIDAL ENERGY PROJECT (January 4, 2012) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Ocean Renewable Power Company, LLC's application for an 8-year pilot license for the proposed Cobscook Bay Tidal Energy Project (FERC Project No. 12711-005), which would be located in Cobscook Bay in Washington County, Maine, and has prepared an environmental assessment (EA) in cooperation with the U.S. Department of Energy

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

FROM: FRANK MARCINOWSKI DEPUTY ASSISTANT S TECHNICAL AND REGULATORY SUPPORT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2012 , 2012 FROM: FRANK MARCINOWSKI DEPUTY ASSISTANT S TECHNICAL AND REGULATORY SUPPORT SUBJECT: Annual National Environmental Policy Act Planning Summary This memorandum transmits the 2012 Annual National Environmental Policy Act (NEP A) Planning Summary for NEP A documents anticipated for the Office of Environmental Management (EM), Headquarters. The attached Summary contains data on environmental impact statements only. At this time, we do not expect Headquarters actions to warrant other NEP A reviews; if this should change during the year, we will, of course, work with your office to comply with all NEP A requirements as appropriate. In that the DOE NEP A Order provides for Field Managers to submit Annual NEP A Planning Summaries directly to your office, we are preparing a compilation of all NEP A

422

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT (January 15, 2013) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects reviewed the Public Utility District No. 1 of Snohomish County, Washington's (Snohomish PUD) application for a 10-year pilot license for the proposed Admiralty Inlet Tidal Project No. 12690, which would be located in Admiralty Inlet in Puget Sound, near the City of Port Townsend, in Island County, Washington, and has prepared an environmental assessment (EA) in cooperation with the U.S. Department of Energy (DOE/EA-1949). In the EA, Commission staff analyzed the potential environmental effects of constructing and

423

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINAL ENVIRONMENTAL ASSESSMENT FINAL ENVIRONMENTAL ASSESSMENT (August 9, 2013) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects reviewed the Public Utility District No. 1 of Snohomish County, Washington's (Snohomish PUD) application for a 10-year license for the proposed Admiralty Inlet Pilot Tidal Project No. 12690, which would be located in Admiralty Inlet in Puget Sound, near the City of Port Townsend, in Island County, Washington, and has prepared a final environmental assessment (FEA) in cooperation with the U.S. Department of Energy (DOE/EA-1949). In the FEA, Commission staff analyzed the potential environmental effects of

424

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reedsport OPT Wave Park, LLC Project No. 12713-002 Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon NOTICE OF AVAILABILITY OF ENVIRONMENTAL ASSESSMENT (December 3, 2010) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Reedsport OPT Wave Park, LLC's application for license for the Reedsport OPT Wave Park Project (FERC Project No. 12713-002), which would be located in Oregon State territorial waters about 2.5 nautical miles off the coast near Reedsport, in Douglas County, Oregon. Staff prepared an environmental assessment (EA), which analyzes the potential environmental effects of licensing the project and concludes that licensing the project,

425

Regulatory Supervision of Radiological Protection in the Russian Federation as Applied to Facility Decommissioning and Site Remediation  

Science Conference Proceedings (OSTI)

The Russian Federation is carrying out major work to manage the legacy of exploitation of nuclear power and use of radioactive materials. This paper describes work on-going to provide enhanced regulatory supervision of these activities as regards radiological protection. The scope includes worker and public protection in routine operation; emergency preparedness and response; radioactive waste management, including treatment, interim storage and transport as well as final disposal; and long term site restoration. Examples examined include waste from facilities in NW Russia, including remediation of previous shore technical bases (STBs) for submarines, spent fuel and radioactive waste management from ice-breakers, and decommissioning of Radio-Thermal-Generators (RTGs) used in navigational devices. Consideration is given to the identification of regulatory responsibilities among different regulators; development of necessary regulatory instruments; and development of regulatory procedures for safety case reviews and compliance monitoring and international cooperation between different regulators. (authors)

Sneve, M.K. [Norwegian Radiation Protection Authority (Norway); Shandala, N.K. [Institute of Biophysics, Moscow (Russian Federation)

2007-07-01T23:59:59.000Z

426

SunShot Initiative: Policy and Regulatory Environment  

NLE Websites -- All DOE Office Websites (Extended Search)

Policy and Regulatory Environment Policy and Regulatory Environment to someone by E-mail Share SunShot Initiative: Policy and Regulatory Environment on Facebook Tweet about SunShot Initiative: Policy and Regulatory Environment on Twitter Bookmark SunShot Initiative: Policy and Regulatory Environment on Google Bookmark SunShot Initiative: Policy and Regulatory Environment on Delicious Rank SunShot Initiative: Policy and Regulatory Environment on Digg Find More places to share SunShot Initiative: Policy and Regulatory Environment on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Balance of Systems Reducing Non-Hardware Costs Lowering Barriers Fostering Growth Policy and Regulatory Environment Photo of a man speaking while seated at a table with men and women surrounding him.

427

EPAct Transportation Regulatory Activities: Compliance Methods for State  

NLE Websites -- All DOE Office Websites (Extended Search)

Compliance Methods for State and Alternative Fuel Provider Fleets to someone by E-mail Share EPAct Transportation Regulatory Activities: Compliance Methods for State and Alternative Fuel Provider Fleets on Facebook Tweet about EPAct Transportation Regulatory Activities: Compliance Methods for State and Alternative Fuel Provider Fleets on Twitter Bookmark EPAct Transportation Regulatory Activities: Compliance Methods for State and Alternative Fuel Provider Fleets on Google Bookmark EPAct Transportation Regulatory Activities: Compliance Methods for State and Alternative Fuel Provider Fleets on Delicious Rank EPAct Transportation Regulatory Activities: Compliance Methods for State and Alternative Fuel Provider Fleets on Digg Find More places to share EPAct Transportation Regulatory

428

Science Review Review Definitions  

NLE Websites -- All DOE Office Websites (Extended Search)

IPTS Proposal Review Ratings IPTS Proposal Review Ratings 5 Extraordinary The proposal involves cutting-edge research of great scientific importance. Proposed research will significantly advance knowledge in a specific field or scientific discipline. The characteristics of the SNS and/or HFIR are essential to the success of the proposed work. I believe this proposal must be supported with the highest priority. 4.5 Excellent to Extraordinary -- 4 Excellent The proposed research is of high quality and has potential for making an important contribution to a specific field or scientific discipline. The work is innovative and is likely to be published in a leading scientific journal. The use of SNS and/or HFIR is highly desirable for the success of the proposed work. I strongly recommend that this proposal

429

Book Review  

E-Print Network (OSTI)

Book Review: Bridging: How Gloria Anzaldua’s Life and Workoverlapping identities, the book is comprised of fiveand again” (203). Fowler| Book Review: Bridging: How Gloria

Fowler, Rebecca

2013-01-01T23:59:59.000Z

430

Technical Analysis of the Federal Energy Regulatory Commission Order on Smart Grid Interoperability Standards  

Science Conference Proceedings (OSTI)

As specified in the Energy Independence and Security Act of 2007, the National Institute of Standards and Technology (NIST) is required to post smart grid interoperability standards for consideration by the Federal Energy Regulatory Commission (FERC). FERC is to determine if there is sufficient consensus for the standards to be adopted. A FERC technical conference was held on January 31, 2011, to review the five families of standards that were posted by NIST, and following the technical conference, comme...

2011-10-26T23:59:59.000Z

431

Texas Legal Review | OpenEI Community  

Open Energy Info (EERE)

Texas Legal Review Texas Legal Review Home > Groups > Geothermal Regulatory Roadmap Alevine's picture Submitted by Alevine(5) Member 29 July, 2013 - 14:46 BHFS flora and fauna leasing Legal review permitting roadmap Texas The NREL roadmap team recently met with our legal team Brownstein Hyatt Farber and Schreck (www.bhfs.com) for a review of the Texas portion of the Geothermal Regulatory Roadmap (GRR). BHFS provided excellent suggestions to the Section 3 flowcharts for geothermal leases on Texas state lands. The Texas portion of the GRR now encompasses a flowchart for Texas state land leasing on Permanent School Fund Lands, Texas Parks and Wildlife Department Lands, Land Trade Lands, and Relinquishment Act Lands. Additionally, BHFS provided many other helpful tips for clarifying other

432

Current California legislative and regulatory activity impacting geothermal hydrothermal commercialization: monitoring report No. 3. Report No. 1023  

DOE Green Energy (OSTI)

The current legislative activity covers the following: federal funds, state financial incentives, air quality bills, transmission line access, state energy agency reorganization, and state energy taxes. Current regulatory activities of the California Energy Commission, and the Lake County Air Pollution Control District are reviewed. (MHR)

Not Available

1980-07-20T23:59:59.000Z

433

Proceedings of the tenth annual DOE low-level waste management conference: Session 1: Institutional and regulatory issues  

Science Conference Proceedings (OSTI)

This document contains eleven papers on various aspects of low-level radioactive waste regulation. Topics include: EPA environmental standards; international exemption principles; the concept of below regulatory concern; envirocare activities in Utah; mixed waste; FUSRAP and the Superfund; and a review of various incentive programs. Individual papers are processed separately for the data base. (TEM)

Not Available

1988-12-01T23:59:59.000Z

434

The Regulatory Process of the Energy Conservation Law in Japan  

NLE Websites -- All DOE Office Websites (Extended Search)

The Regulatory Process of the Energy Conservation Law in Japan Speaker(s): Taishi Sugiyama Date: March 26, 2002 - 12:00pm Location: Bldg. 90 We examined the regulatory process of...

435

DoC NIST Cybersecurity RFI  

Science Conference Proceedings (OSTI)

... Challenges: tight budgets, governing internet access and protecting personal information ... exact same principle as the small gas station transaction. ...

2013-04-09T23:59:59.000Z

436

RFI - Comments on Computer Security Incident Coordination  

Science Conference Proceedings (OSTI)

... 21:49 To: incidentcoordination@nist.gov Subject: Computer Security Incident Coordination (CSIC): Providing Timely Cyber Incident Response ...

2013-08-19T23:59:59.000Z

437

RFI - Comments on Computer Security Incident Coordination  

Science Conference Proceedings (OSTI)

For the purposes of this response, we categorise the cyber security maturity of organisations into these three categories with these attributes: ...

2013-08-19T23:59:59.000Z

438

RFI Comments - Advanced Cyber Security Center  

Science Conference Proceedings (OSTI)

Page 1. Page 1 of 3 Advanced Cyber Security Center Rollout ... The Need The advanced cyber threat is real and growing. ...

2013-04-09T23:59:59.000Z

439

NSS Labs - NIST: Cyber Security Framework RFI  

Science Conference Proceedings (OSTI)

... All rights reserved. 8 Page 9. ... upon other critical physical and information infrastructures, including telecommunications, energy, financial services ...

2013-04-10T23:59:59.000Z

440

Commercial Buildings Asset Rating Program RFI  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

57 Aug 05, 2011 57 Aug 05, 2011 Jkt 223001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\08AUN1.SGM 08AUN1 mstockstill on DSK4VPTVN1PROD with NOTICES 48152 Federal Register / Vol. 76, No. 152 / Monday, August 8, 2011 / Notices TABLE 5.1-TEST LOAD SIZES-Continued Container volume Minimum load Maximum load Average load cu. ft. liter ≄ < ≄ < lb kg lb kg lb kg 4.80-4.90 135.9-138.8 3.00 1.36 19.90 9.02 11.45 5.19 4.90-5.00 138.8-141.6 3.00 1.36 20.30 9.20 11.65 5.28 5.00-5.10 141.6-144.4 3.00 1.36 20.70 9.39 11.85 5.38 5.10-5.20 144.4-147.2 3.00 1.36 21.10 9.58 12.05 5.47 5.20-5.30 147.2-150.1 3.00 1.36 21.50 9.76 12.25 5.56 5.30-5.40 150.1-152.9 3.00 1.36 21.90 9.95 12.45 5.65 5.40-5.50 152.9-155.7 3.00 1.36 22.30 10.13 12.65 5.75 5.50-5.60 155.7-158.6 3.00 1.36 22.80 10.32 12.90 5.84

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Microsoft Word - OPower RFI Response_110510.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPOWER submits these comments to the Department of Energy in response to the recently OPOWER submits these comments to the Department of Energy in response to the recently issued Request for Information on smart grid implementation challenges. In particular, OPOWER writes to comment on the importance of effective customer engagement in smart grid policy making. OPOWER is an energy efficiency software company that uses behavioral science and data analytics to help utilities better engage their customers and motivate them to use less energy. OPOWER is partnering with 43 utilities including seven of the nation's ten largest, and is providing the customer engagement platform in several major smart grid deployments. The OPOWER platform offers a cost-effective way to convert advanced meter data into insights that deliver the value of the smart grid directly to the customer.

442

RFI COMMENTS - CS1 ICT SCRM  

Science Conference Proceedings (OSTI)

... A number of national bodies and liaison organizations (Belgium, Canada, China, France, Japan, Korea, Luxembourg, Malaysia, Russia, Singapore ...

2013-04-10T23:59:59.000Z

443

SAIC COMMENTS REGARDING NIST RFI ON DEVELOPING ...  

Science Conference Proceedings (OSTI)

... Backup power supplies lessened the impact on individuals and families ... such as hospitals), and cell-providers who had emergency generators. ...

2013-04-09T23:59:59.000Z

444

RFI released for Livermore Valley Open Campus  

NLE Websites -- All DOE Office Websites (Extended Search)

devices, economic security, cyber security, high performance computing and non-proliferation. These activities will be supported by core institutional competencies,...

445

RFI Well Integrity 06 JUL 1400  

Energy.gov (U.S. Department of Energy (DOE))

This PowerPoint report entitled "Well Integrity During Shut - In Operations: DOE/DOI Analyses" describes risks and suggests risk management recommendations associated with shutting in the well.

446

RFI Comments - CenterPoint Energy  

Science Conference Proceedings (OSTI)

... Corporation Critical Infrastructure Protection Committee ("NERC ... National Laboratmy ("INL"), Pacific Nmthwest ... ensuring work force possess skill ...

2013-04-09T23:59:59.000Z

447

Initial Analysis of Cybersecurity Framework RFI Response  

Science Conference Proceedings (OSTI)

... of replacing billions of dollars in aging infrastructure, not to ... that have expertise in utility networks. ... have experience in the utilities sector.” • “…ensure ...

2013-05-16T23:59:59.000Z

448

RFI Comments - GridWise Alliance  

Science Conference Proceedings (OSTI)

... on building the most secure environment; companies also ... NERC CIP cyber security requirements and ... NRC for the nation's nuclear fleet currently ...

2013-04-10T23:59:59.000Z

449

Request for Information (RFI)--Photovoltaic (PV) ...  

Science Conference Proceedings (OSTI)

... Integrating this level of digital modeling and simulation ... What management models are best suited for ... a not-for-profit management model, such as ...

2011-12-07T23:59:59.000Z

450

RFI Comments - ISO/RTO Council  

Science Conference Proceedings (OSTI)

... RTOs have developed additional instrumentation tools to measure ... disrupted (typically related to weather incidents), the ... as a security tool as well. ...

2013-04-10T23:59:59.000Z

451

RFI Comments - Argonne National Laboratory 032513.docx  

Science Conference Proceedings (OSTI)

... When we share cyber threat data within DOE – we see the internal attribution. ANL would know that this piece of threat data came from ORNL. ...

2013-04-02T23:59:59.000Z

452

RFI Comments - CTIA The Wireless Association  

Science Conference Proceedings (OSTI)

... the First and Second CTIA White Papers into these ... 50 See CTIA Second White Paper, at 4 (“Digital ... 54 The FCC's light touch reflects Congress's ...

2013-04-08T23:59:59.000Z

453

RFI Comments - Velocity Partners Security & Compliance ...  

Science Conference Proceedings (OSTI)

... harmless to inject malware. [3] Internet content provider Google detects 9500 malicious web-sites daily. [4] When one considers ...

2013-04-02T23:59:59.000Z

454

CONTAIN independent peer review  

SciTech Connect

The CONTAIN code was developed by Sandia National Laboratories under the sponsorship of the US Nuclear Regulatory Commission (NRC) to provide integrated analyses of containment phenomena. It is used to predict nuclear reactor containment loads, radiological source terms, and associated physical phenomena for a range of accident conditions encompassing both design-basis and severe accidents. The code`s targeted applications include support for containment-related experimental programs, light water and advanced light water reactor plant analysis, and analytical support for resolution of specific technical issues such as direct containment heating. The NRC decided that a broad technical review of the code should be performed by technical experts to determine its overall technical adequacy. For this purpose, a six-member CONTAIN Peer Review Committee was organized and a peer review as conducted. While the review was in progress, the NRC issued a draft ``Revised Severe Accident Code Strategy`` that incorporated revised design objectives and targeted applications for the CONTAIN code. The committee continued its effort to develop findings relative to the original NRC statement of design objectives and targeted applications. However, the revised CONTAIN design objectives and targeted applications. However, the revised CONTAIN design objectives and targeted applications were considered by the Committee in assigning priorities to the Committee`s recommendations. The Committee determined some improvements are warranted and provided recommendations in five code-related areas: (1) documentation, (2) user guidance, (3) modeling capability, (4) code assessment, and (5) technical assessment.

Boyack, B.E. [Los Alamos National Lab., NM (United States); Corradini, M.L. [Univ. of Wisconsin, Madison, WI (United States). Nuclear Engineering Dept.; Denning, R.S. [Battelle Memorial Inst., Columbus, OH (United States); Khatib-Rahbar, M. [Energy Research Inc., Rockville, MD (United States); Loyalka, S.K. [Univ. of Missouri, Columbia, MO (United States); Smith, P.N. [AEA Technology, Dorchester (United Kingdom). Winfrith Technology Center

1995-01-01T23:59:59.000Z

455

US Department of Energys Regulatory Negotiations Convening...  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Negotiations Convening on Commercial Certification for Heating, Ventilating, Air-Conditioning, and Refrigeration Equipment Public Information for Convening Interviews...

456

Lawrence E. Jones, Ph.D. Vice President, Regulatory Affairs ...  

Science Conference Proceedings (OSTI)

... Vice President, Regulatory Affairs, Policy and Industry Relations, North America. ... Aid Wind Integration” published in North American Wind Power Vol ...

2012-03-13T23:59:59.000Z

457

EIA - Smart Grid Legislative and Regulatory Policies and Case Studies  

U.S. Energy Information Administration (EIA)

State Energy Data System ... Smart Grid Legislative and Regulatory ... Recent activity includes the deployment of smart meters, distribution automation and ...

458

Nuclear Regulatory Commission issuances, April 1995. Volume 41, Number 4  

SciTech Connect

This book contains issuances of the Nuclear Regulatory Commission and of the Atomic Safety and Licensing Boards, and an issuance of the Director`s decision. The issuances concern a petition filed by Dr. James E Bauer seeking interlocutory Commission review of the Atomic Safety and Licensing Board`s order imposing several restrictions on Dr. Bauer; a denial of an Interveners` Petition for Review addressing the application of Babcock and Wilcox for a renewal of its Special Nuclear Materials License; granting a motion for a protective order, by Sequoyah Fuel Corporation and General Atomics, limiting the use of the protected information to those individuals participating in the litigation and for the purposes of the litigation only; granting a Petitioner`s petition for leave to intervene and request for a hearing concerning Georgia Institute of Technology (Georgia Tech Research Reactor) renewal of a facility license; and a denial of a petition filed by Mr. Ted Dougherty requesting a shutdown of the San Onofre Nuclear Generating Station based on concerns regarding the vulnerability of the plant to earthquakes and defensibility of the plant to a terrorist threat.

NONE

1995-04-01T23:59:59.000Z

459

Regulatory governance in African telecommunications: Testing the resource curse hypothesis  

Science Conference Proceedings (OSTI)

This paper examines regulatory governance in the context of African telecommunications. Though there is already a substantial literature devoted to the regulatory practices in developing countries, it generally conceptualizes the quality of regulation ... Keywords: Africa, Development, Paradox of plenty, Regulatory governance, Resource curse, Telecommunications regulation

Krishna Jayakar; Brandie Martin

2012-10-01T23:59:59.000Z

460

On the Accuracy of Regulatory Cost Estimates  

NLE Websites -- All DOE Office Websites (Extended Search)

On the Accuracy of Regulatory Cost Estimates On the Accuracy of Regulatory Cost Estimates Speaker(s): Richard Morgenstern Date: December 10, 2013 - 12:00pm - 1:00pm Location: 90-3122 Seminar Host/Point of Contact: Alan Sanstad Margaret Taylor Over the past several decades, the U.S. has seen a gradual reduction in economic regulation and a simultaneous increase in safety, health, environmental, and other social regulations. Especially with the prospect of regulation on greenhouse gases under the Clean Air Act, there is growing concern about the costs, effectiveness, and benefits of federal rules. While prospective or ex ante analyses of the benefits and costs of major federal regulations are now a standard part of government operations, retrospective or ex post analyses, focusing on measurements of actual

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Depleted Uranium Uses: Regulatory Requirements and Issues  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Depleted Uranium Uses Depleted Uranium Uses Regulatory Requirements Regulatory Requirements and Issues and Issues Nancy L. Ranek Nancy L. Ranek Argonne National Laboratory Argonne National Laboratory August 5, 1998 August 5, 1998 Beneficial Reuse '98 Beneficial Reuse '98 Knoxville, TN Knoxville, TN NOTES Work Performed for: Office of Facilities (NE-40) Office of Nuclear Energy, Science and Technology U.S. Department of Energy Work Performed by: Environmental Assessment Division Argonne National Laboratory 955 L'Enfant Plaza North, S.W. Washington, D.C. 20024 Phone: 202/488-2417 E-mail: ranekn@smtplink.dis.anl.gov 2 2 2 Programmatic Environmental Programmatic Environmental Impact Statement (PEIS) Impact Statement (PEIS) Draft PEIS Published 12/97 * Preferred Alternative = 100% Use

462

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555  

Office of Legacy Management (LM)

REGULATORY COMMISSION REGULATORY COMMISSION WASHINGTON, D. C. 20555 JAN 2 2 1982 -/ Departmznt'of Ene,rgy ATTN : Dr. William E. Mott, Director Environmental and Safety Engineering Division (EP-32) Washington, D.C. 20545 Dear Dr. Mott: Enclosed is the list of contaminated'or potentially contaminated sites that I promised to send you during our recent meeting. The sites have been broken down into the followi,ng four categories: 1. Sites with known contamination that have never been 1 icensed. 2. Formerly licensed sites with known contamination. 3. Currently licensed sites that are being decontaminated prior to decoronissioning. 4. A list of formerly licensed sites that need to be visited to determine if they have been properly decontaminated prior to decommissioning.

463

Geothermal Regulatory Roadmap | OpenEI Community  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap Home > Features > Groups Content Group Activity By term Q & A Feeds Content type Blog entry Discussion Document Event Poll Question Keywords Author Apply Kyoung Geothermal NEPA Workshop at GRC Posted by: Kyoung 14 Oct 2013 - 20:19 On Tuesday, October 2, the Geothermal Technology Office and the National Renewable Energy Laboratory held a 1/2-day NEPA workshop. The workshop was held at the MGM Grand in Las Vegas, in conjunction... Tags: Categorical Exclusions, CX, Database, EA, EIS, FONSI, GEA, GRC, GRR, NEPA Jweers New Robust References! Posted by: Jweers 7 Aug 2013 - 18:23 Check out the new Reference Form. Adding... 1 comment(s) Tags: citation, citing, developer, formatting, reference, Semantic Mediawiki, wiki Graham7781

464

NUCLEAR REGULATORY,.COMMISSION REGION I  

Office of Legacy Management (LM)

REGULATORY,.COMMISSION REGULATORY,.COMMISSION REGION I lY,.COMMISSION 475 ALLENDALE ROAD KlNG OF PRUSSIA. PENNSYLVANIA 194061415 GION I NOALE ROAD ENNSYLVANlA 194061415 MAY I5 1996 MAY I5 1996 Docket No. 040-07964 License No. SlJ (Rs Heyman Properties Attention: Mr. John S. Russo Facility Manager 333 Post Road West Westport, CT 06881 SUBJECT: INSPECTION NO. 040-07964/96-001 Dear Mr. Russo: On April 15, 1996, Todd J. Jackson of this office conducted a routine inspection at 737 Canal Street, Stamford, Connecticut of activities o Oliver Incorporated, authorized by Atomic Energy Commission (AEC) Lit SUB-00967. The inspection consisted of observations by the inspect0 interviews with personnel, and a radiological survey by the inspector Jackson was accompanied on this inspection by representatives of the

465

Natural Gas Regulatory Policy: Current Issues  

E-Print Network (OSTI)

"Many changes have occurred in recent months in both federal and state natural gas regulation. Those changes have increased the options of industrial energy consumers for purchasing and moving natural gas. This panel will discuss important developments in federal and state regulatory arenas and their impacts on purchasing options. Among the issues discussed will be: 1. Federal Regulation a. Self-implementing transportation b. Service obligation c. Pipeline capacity brokering d. Non-regulated and partially regulated sales e. FERC Order No. 500 f. Rate treatments impacts 2. State Regulation a. Prorationing impacts b. Federal preemption of state conservation authority 3. Regulatory and Contract Problems Facing the Natural Gas Marketer 4. The Contours of the Current Marketplace "

Watkins, G.

1988-09-01T23:59:59.000Z

466

Basis for Changing Chromium Regulatory Health Values  

Science Conference Proceedings (OSTI)

Hexavalent chromium, Cr(VI), acts as a chemical driver for many human health risk assessments under the Clean Air Act Amendments of 1990 and other regulatory programs across a range of industrial sectors, including the electric power sector. To characterize and manage the health and environmental risk related to toxics, agencies and the regulated sectors must rely on the development of scientific estimates of the exposure-to-response relationship to understand and quantify the potential hazard ...

2012-12-31T23:59:59.000Z

467

Topical report review status. Volume 9, No. 1  

SciTech Connect

This report provides industry with procedures for submitting topical reports, guidance on how the US Nuclear Regulatory Commission (NRC) processes and responds to topical report submittals, and an accounting, with review schedules, of all topical reports currently accepted for review by the NRC. This report is published semiannually.

NONE

1995-02-01T23:59:59.000Z

468

EPAct Transportation Regulatory Activities: National Grid Exceeds EPAct  

NLE Websites -- All DOE Office Websites (Extended Search)

National National Grid Exceeds EPAct Requirements Deploying Natural Gas Technology to someone by E-mail Share EPAct Transportation Regulatory Activities: National Grid Exceeds EPAct Requirements Deploying Natural Gas Technology on Facebook Tweet about EPAct Transportation Regulatory Activities: National Grid Exceeds EPAct Requirements Deploying Natural Gas Technology on Twitter Bookmark EPAct Transportation Regulatory Activities: National Grid Exceeds EPAct Requirements Deploying Natural Gas Technology on Google Bookmark EPAct Transportation Regulatory Activities: National Grid Exceeds EPAct Requirements Deploying Natural Gas Technology on Delicious Rank EPAct Transportation Regulatory Activities: National Grid Exceeds EPAct Requirements Deploying Natural Gas Technology on Digg

469

Book Reviews  

Science Conference Proceedings (OSTI)

In Book Reviews, we review an extensive and diverse range of books. They cover theory and applications in operations research, statistics, management science, econometrics, mathematics, computers, and information systems. In addition, we include ...

Benjamin Lev

2007-09-01T23:59:59.000Z

470

Book Reviews  

Science Conference Proceedings (OSTI)

In Book Reviews, we review an extensive and diverse range of books. They cover theory and applications in operations research, statistics, management science, econometrics, mathematics, computers, and information systems. In addition, we include ...

Graham K. Rand

2013-01-01T23:59:59.000Z

471

Book Reviews  

Science Conference Proceedings (OSTI)

In Book Reviews, we review an extensive and diverse range of books. They cover theory and applications in operations research, statistics, management science, econometrics, mathematics, computers, and information systems. In addition, we include ...

Graham K. Rand

2013-03-01T23:59:59.000Z

472

The Standard Review Plan for Review of License Renewal Applications for Nuclear Power  

E-Print Network (OSTI)

Plants (SRP-LR) provides guidance to Nuclear Regulatory Commission staff reviewers in the Office of Nuclear Reactor Regulation. These reviewers perform safety reviews of applications to renew nuclear power plant licenses in accordance with Title 10 of the Code of Federal Regulations Part 54. The principal purposes of the SRP-LR are to ensure the quality and uniformity of staff reviews and to present a well-defined base from which to evaluate applicant programs and activities for the period of extended operation. The SRP-LR is also intended to make information about regulatory matters widely available, to enhance communication with interested members of the public and the nuclear power industry, and to improve public and industry understanding of the staff review process. The safety review is based primarily on the information provided by the applicant in a license renewal application. Each of the individual SRP-LR sections addresses (1) who performs the review, (2) the matters that are reviewed, (3) the basis for review, (4) the way the review is accomplished, and (5) the conclusions that are sought.

Power Plants

2005-01-01T23:59:59.000Z

473

Book Review  

E-Print Network (OSTI)

Work Transformed Our Own Rebecca Fowler Bridging: How Gloriaagain and again” (203). Fowler| Book Review: Bridging: How

Fowler, Rebecca

2013-01-01T23:59:59.000Z

474

NETL: IEP - Mercury Emissions Control: Regulatory Drivers  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Drivers Regulatory Drivers The Clean Air Act Amendments of 1990 (CAAA) brought about new awareness regarding the overall health-effects of stationary source fossil combustion emissions. Title III of the CAAA identified 189 pollutants, including mercury, as hazardous or toxic and required the Environmental Protection Agency (EPA) to evaluate their emissions by source, health effects and environmental implications, including the need to control these emissions. These pollutants are collectively referred to as air toxics or hazardous air pollutants (HAPs). The provisions in Title III specific to electric generating units (EGU) were comprehensively addressed by DOE's National Energy Technology Laboratory (NETL) and the Electric Power Research Institute (EPRI) in collaborative air toxic characterization programs conducted between 1990 and 1997. This work provided most of the data supporting the conclusions found in EPA's congressionally mandated reports regarding air toxic emissions from coal-fired utility boilers; the Mercury Study Report to Congress (1997)1 and the "Study of Hazardous Air Pollutant Emissions from Electric Utility Steam Generating Units -- Final Report to Congress" (1998).2 The first report identified coal-fired power plants as the largest source of human-generated mercury emissions in the U.S. and the second concluded that mercury from coal-fired utilities was the HAP of "greatest potential concern" to the environment and human health that merited additional research and monitoring.

475

IEP - Water-Energy Interface: Regulatory Drivers  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Drivers Regulatory Drivers Several legislative acts are in place that could potentially impact water quality requirements and water use for fossil energy production as well as electricity generation. These acts regulate pollutant discharge and water intake directly and indirectly. Under regulations established by the United States Environmental Protection Agency (EPA), these Acts serve to maintain and improve the Nation's water resources for uses including but not limited to agricultural, industrial, nutritional, and recreational purposes. The Clean Water Act - The Federal Water Pollution Control Act, more commonly known as the Clean Water Act, provides for the regulation of discharges to the nation's surface waters. To address pollution, the act specifies that the discharge of any pollutant by any person is unlawful except when in compliance with applicable permitting requirements. Initial emphasis was placed on "point source" pollutant discharge, but 1987 amendments authorized measures to address "non-point source" discharges, including stormwater runoff from industrial facilities. Permits are issued under the National Pollutant Discharge Elimination System (NPDES), which designates the highest level of water pollution or lowest acceptable standards for water discharges. NPDES permits are typically administered by the individual states. With EPA approval, the states may implement standards more stringent than federal water quality standards, but may not be less stringent. Certain sections of the Act are particularly applicable to water issues related to power generation. These include:

476

Review of the Attributes and Performance of 10 Rural Diffusion Models  

Science Conference Proceedings (OSTI)

An American Meteorological Society committee, working cooperatively with the U.S. Environmental Protection Agency (EPA), has sponsored a peer review and evaluation of 10 rural diffusion models that are now used in regulatory procedures or have ...

Maynard E. Smith

1984-06-01T23:59:59.000Z

477

Developing a Regulatory Framework for Extended Storage and Transportation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Developing a Regulatory Framework Developing a Regulatory Framework for Extended Storage and Transportation National Transportation Stakeholders Forum May 10-12, 2011 Denver, Colorado Earl Easton Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Outline * Current Regulatory Framework * Future Regulatory Needs * Technical Basis (with some examples) * Path Forward 2 Current NRC Regulatory Framework for Storage * Renewable Term Licenses * Aging Management Plan - Time-limited aging analyses - Design for prevention - Monitoring - how, how often, in-situ - Maintenance - what type - Corrective Actions - when 3 Dry Cask Storage * 63 licensed ISFSIs (8 more than 2010) * Expect 10 sites pursuing General License * Over 1400 loaded storage casks 0 10 20 30 40 50 60 70 80 Number of ISFSIs Year Specific Licensees

478

Category:Regulatory Roadmap State Sections | Open Energy Information  

Open Energy Info (EERE)

Regulatory Roadmap State Sections Regulatory Roadmap State Sections Jump to: navigation, search GRR-logo.png Looking for the Geothermal Regulatory Roadmap? Click here for a user-friendly list of Geothermal Regulatory Roadmap pages. This is the Regulatory Roadmap State Sections category. Add.png Add an Section Pages in category "Regulatory Roadmap State Sections" The following 200 pages are in this category, out of 339 total. (previous 200) (next 200) G GRR/Section 1-AK-a - Land Use Considerations GRR/Section 1-CA-a - State Land Use Planning GRR/Section 1-HI-a - Land Use Considerations GRR/Section 1-ID-a - Land Use Considerations GRR/Section 1-MT-a - Land Use Considerations GRR/Section 1-NV-a - State Land Use Planning GRR/Section 1-OR-a - Land Use Considerations GRR/Section 11-AK-a - State Cultural Considerations

479

Category:Geothermal Regulatory Roadmap Sections | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Category Edit History Facebook icon Twitter icon » Category:Geothermal Regulatory Roadmap Sections Jump to: navigation, search GRR-logo.png Looking for the Geothermal Regulatory Roadmap? Click here for a user-friendly list of Geothermal Regulatory Roadmap pages. Add.png Add a Section Pages in this category are created or edited using the RRSection form. Subcategories This category has the following 2 subcategories, out of 2 total. R [×] Regulatory Roadmap Overview Sections‎ 22 pages [×] Regulatory Roadmap State Sections‎ 362 pages Pages in category "Geothermal Regulatory Roadmap Sections" The following 200 pages are in this category, out of 432 total. (previous

480

AGENCY: Federal Energy Regulatory Commission. ACTION: Final Rule.  

E-Print Network (OSTI)

SUMMARY: The Federal Energy Regulatory Commission (Commission) is amending its regulations in accordance with section 311(d) of the Energy Policy Act of 2005 (EPAct 2005) to establish mandatory procedures requiring prospective applicants to begin the Commission’s pre-filing review process at least six months prior to filing an application for authorization to site and construct a liquefied natural gas (LNG) terminal. Section 311(d) of EPAct 2005, enacted on August 8, 2005, directs the Commission to promulgate such regulations within 60 days after enactment of EPAct 2005. The regulations ’ mandatory procedures are designed to encourage applicants for LNG terminal siting and construction authority to cooperate with state and local officials, as required by EPAct 2005. The regulations also make the pre-filing process mandatory for prospective applicants for authority to construct related jurisdictional pipeline and other natural gas facilities, as defined in the regulations. The regulations also require a prospective applicant to comply with the pre-filing procedures prior to filing an application to make modifications to an existing or authorized LNG terminalDocket No. RM05-31-000-- 2--if such modifications involve significant state and local safety considerations that have

Richard Hoffmann; John Leiss; Whit Holden

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory review rfi" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Environmental regulatory update table: September/October 1994  

SciTech Connect

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlberg, L.M.; Hawkins, G.T.; Bock, R.E.; Salk, M.S.

1994-11-01T23:59:59.000Z

482

Environmental sciences division: Environmental regulatory update table July 1988  

Science Conference Proceedings (OSTI)

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Langston, M.E.; Nikbakht, A.; Salk, M.S.

1988-08-01T23:59:59.000Z

483

Environmental Regulatory Update Table, November--December 1993  

SciTech Connect

The Environmental Regulatory Update Table provides information on regulatory of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.; Danford, G.S.; Lewis, E.B.

1994-01-01T23:59:59.000Z

484

Public Utility Regulatory Policies Act of 1978 (PURPA) as Applicable...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Act of 1978 (PURPA) as Applicable to the Energy Policy Act of 2005 (EPACT 2005) - List of Covered Electric Utilities. Public Utility Regulatory Policies Act of 1978 (PURPA)...

485

Colorado/Transmission/Regulatory Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Colorado‎ | Transmission Jump to: navigation, search Colorado Transmission Transmission Regulatory Roadmap Roadmap State Data Regulatory Overview General TOOLS Regulatory Roadmap Regulatory Wizard Best Practices Document Library NEPA Database Glossary TECHNOLOGIES Geothermal Solar Water Wind TOPICS Land Use Planning Land Access Exploration Well Field Power Plant Transmission Water Rights Environment The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart

486

Work for Nuclear Regulatory Commission, Safety Related Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Regulatory Nuclear Regulatory Commission Capabilities Sensors and Instrumentation and Nondestructive Evaluation Overview Energy System Applications Safety-Related Applications Overview DOE Office of Nuclear Energy, Science, and Technology Nuclear Regulatory Commission National Aeronautics and Space Administration (NASA) Homeland Security Applications Biomedical Applications Millimiter Wave Group Papers Other NPNS Capabilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Sensors and Instrumentation and Nondestructive Evaluation Safety Related Applications Bookmark and Share Nuclear Regulatory Commission International Steam Generator Tube Integrity Program Key objectives of the International Steam Generator Tube Integrity Program

487

Department of Energy and Nuclear Regulatory Commission Increase Cooperation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Regulatory Commission Increase Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership Department of Energy and Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership July 17, 2007 - 2:55pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) and Nuclear Regulatory Commission (NRC) expanded cooperation for President Bush's Global Nuclear Energy Partnership (GNEP) through a Memorandum of Understanding (MOU) that was signed on Friday by DOE's GNEP Deputy Program Manager Paul Lisowski and NRC Executive Director for Operations Luis Reyes. The MOU establishes the foundation for increased cooperation between DOE and NRC on technological research and engineering studies and marks another important milestone

488

Public Utility Regulatory Act, Alternative Energy Providers (Texas) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regulatory Act, Alternative Energy Providers (Texas) Regulatory Act, Alternative Energy Providers (Texas) Public Utility Regulatory Act, Alternative Energy Providers (Texas) < Back Eligibility Utility Fed. Government Commercial Investor-Owned Utility Industrial Construction Municipal/Public Utility Local Government Rural Electric Cooperative Tribal Government Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Texas Program Type Safety and Operational Guidelines Provider Public Utility Commission of Texas Chapter 35 of the Public Utility Regulatory Act specifically addresses alternative energy providers, and contains provisions designed to aid such providers in selling power in Texas's competitive utility market. The

489

DOE Ex Parte Memorandum- Center for Regulatory Effectiveness  

Energy.gov (U.S. Department of Energy (DOE))

The Center for Regulatory Effectiveness (CRE) is submitting this memorandum pursuant to the Department of Energy’s (DOE) Guidance on Ex Parte Communications.

490

Presentation to the National Association of Regulatory Utility Commissioners,  

Reports and Publications (EIA)

Presented by: Jay E. Hakes, EIA Administrator Presented to: National Association of Regulatory Utility Commissioners Staff Subcommittee on Gas San Francisco, CA July 21, 1999

Information Center

1999-07-21T23:59:59.000Z

491

Demand Response & Smart Grid - State Legislative and Regulatory...  

Open Energy Info (EERE)

Page Edit with form History Facebook icon Twitter icon Demand Response & Smart Grid - State Legislative and Regulatory Policy Actions: October 2008 to May 2010 Jump to:...

492

Business Case Slide 32: Regulatory Constraints Analysis (ANL...  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Constraints Analysis (ANL) - Description Description Enabling activity cross-cutting all potential uses of DU in radiologically unregulated areas Tasks Evaluate...

493

Business Case Slide 33: Regulatory Constraints Analysis (ANL...  

NLE Websites -- All DOE Office Websites (Extended Search)

Previous Slide Next Slide Table of Contents Regulatory Constraints Analysis (ANL) - Status Status Evaluation of current status completed in FY02 All manufacturing of DU products...

494

Pursuing Energy Efficiency as a Hedge Against Carbon Regulatory...  

NLE Websites -- All DOE Office Websites (Extended Search)

Pursuing Energy Efficiency as a Hedge Against Carbon Regulatory Risks Current Resource Planning Practices in the West Title Pursuing Energy Efficiency as a Hedge Against Carbon...

495

NETL: News Release - State Regulatory Framework Will Most Likely...  

NLE Websites -- All DOE Office Websites (Extended Search)

February 1, 2011 State Regulatory Framework Will Most Likely Result in Robust CO2 Pipeline System, New Study Says Analysis Funded by NETL May Help Speed Commercialization of...

496

Re: Request for Information on Regulatory Burden of DOE Regulations...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Re: Request for Information on Regulatory Burden of DOE Regulations Comments from Edison Electric Institute on DOE's Request for Information regarding the burden of DOE...

497

NRC Research to Support Regulatory Decisions Related to ...  

Science Conference Proceedings (OSTI)

Presentation Title, NRC Research to Support Regulatory Decisions Related to Subsequent License Renewal Periods. Author(s), C. E. (Gene) Carpenter. On-

498

Regulatory and Financial Reform of Federal Research Policy: Recommenda...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Financial Reform of Federal Research Policy: Recommendations to the NRC Committee on Research Universities Regulatory and Financial Reform of Federal Research Policy:...

499

Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission  

National Nuclear Security Administration (NNSA)

Federal Register Vol. 76, No. 83 Friday, April 29, 2011 Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Project No. 14147-000 Storage Development...

500

Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory...  

Office of Legacy Management (LM)

111989 Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia. Pennsylvania 19406 Dear Mr. Kinneman: -;' .-. 'W...