National Library of Energy BETA

Sample records for regulatory commission office

  1. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1990-08-15

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  2. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1990-04-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  3. US Nuclear Regulatory Commission functional organization charts, March 15, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  4. U. S. Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1989-07-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions and branches are presented.

  5. FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    Reliant and BP Energy at the Palo Verde trading hub in Arizona. BP Energy separately settled its endFEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 NEWS RELEASE NEWS MEDIA CONTACT Energy Regulatory Commission today approved a settlement between the Commission's enforcement staff

  6. FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    outages during California's energy crisis in 2000 and 2001. Since then, OMOI has reviewed additional dataFEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 NEWS RELEASE NEWS MEDIA CONTACT SETTLEMENT BETWEEN DUKE AND COMMISSION STAFF The Federal Energy Regulatory Commission today accepted

  7. FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    Enron's activities during the 2000-2001 Western energy crisis, and approved three other settlementsFEDERAL ENERGY REGULATORY COMMISSION WASHINGTON,D.C.20426 NEWS RELEASE NEWS MEDIA CONTACT JURISDICTION UNDER SECTION 1290 OF EPACT The Federal Energy Regulatory Commission today approved a settlement

  8. US Nuclear Regulatory Commission functional organization charts, January 31, 1992

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  9. FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    that this might mitigate losses in Reliant's existing forward positions. The vice-president of power trading, who POWER EXCHANGE MARKET The Federal Energy Regulatory Commission today approved a staff settlement calling for Reliant Energy to pay $13.8 million for limiting the amount of power it offered to the California Power

  10. Nuclear Regulatory Commission information digest

    SciTech Connect (OSTI)

    None,

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  11. US Nuclear Regulatory Commission functional organization charts, March 15, 1993. Revision 16

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  12. U.S. NUCLEAR REGULATORY COMMISSION Revision 1 February 1996

    E-Print Network [OSTI]

    Johnson, Eric E.

    U.S. NUCLEAR REGULATORY COMMISSION Revision 1 February 1996 REGULATORY GUIDE OFFICE OF NUCLEAR, ADM, U.S. Nuclear Regulatory Commission, Washing- ton, DC 20555-0001. The guides ar REGULATORY RESEARCH REGULATORY GUIDE 8.29 (Draft was issued as DG-8012) INSTRUCTION CONCERNING RISKS FROM

  13. Nuclear Regulatory Commission Handling of Beyond Design Basis Events for Nuclear Power Reactors

    Broader source: Energy.gov [DOE]

    Presenter: Bill Reckley, Chief, Policy and Support Branch, Japan Lessons-Learned Project Directorate, Office of Nuclear Reactor Regulation, US Nuclear Regulatory Commission US Nuclear Regulatory Commission

  14. Nuclear Regulatory Commission | Department of Energy

    Office of Environmental Management (EM)

    Commission Nuclear Regulatory Commission Nuclear Regulatory Commission More Documents & Publications What to Expect When Readying to Move Spent Nuclear Fuel from Commercial Nuclear...

  15. US Nuclear Regulatory Commission functional organization charts, January 31, 1992. Revision 15

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  16. U.S. Nuclear Regulatory Commission organization charts and functional statements. Revision 19

    SciTech Connect (OSTI)

    NONE

    1996-01-31

    Functional statements and organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  17. Nuclear Regulatory Commission Issuances

    SciTech Connect (OSTI)

    NONE

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  18. Nuclear Regulatory Commission Proceedings: A Guide for Intervenors

    E-Print Network [OSTI]

    Hansell, Dean

    1982-01-01

    Nuclear Regulatory Commission Proceedings: A Guide Forto both the Nuclear Regulatory Commission and the Atomicpower, Nuclear Regulatory Commission (NRC or Commission)

  19. FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    . AGREEMENT ACCEPTED BETWEEN ENRON AND NEVADA COMPANIES SETTLING MATTERS STEMMING FROM WESTERN ENERGY CRISIS the 2000-2001 Western energy crisis. "This is another in a long line of settlements the Commission has approved in the wake of the Western energy crisis. Further settlement of issues still outstanding from

  20. FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    in bringing closure to the 2000-2001 energy crisis. Settlements are in the best interests of all parties and I the 2000-2001 energy crisis valued at more than $6.3 billion. Additional information on the Commission's comprehensive actions in response to the 2000-2001 Western energy crisis, along with a list of the related

  1. FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    -2001 Western energy crisis, said Commission Chairman Joseph T. Kelliher. "The parties are to be congratulated remaining disputes stemming from the energy crisis five years ago. "While expediting our pending refund the investment in power plants and transmission needed to prevent another energy crisis in California," Chairman

  2. Nuclear Regulatory Commission issuances

    SciTech Connect (OSTI)

    NONE

    1997-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  3. Nuclear Regulatory Commission issuances

    SciTech Connect (OSTI)

    NONE

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  4. Nuclear Regulatory Commission's Integrated Strategy for Spent...

    Office of Environmental Management (EM)

    Obama pursues alternatives to Yucca Mountain * DOE motion to withdraw in March 2010 * Blue Ribbon Commission on America's Nuclear Future Nuclear Regulatory Commission's...

  5. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1986-11-30

    Functional organization charts for the NRC Commission Offices, Divisions, and Branches are presented.

  6. Nuclear Regulatory Commission 1989 Information Digest

    SciTech Connect (OSTI)

    None,

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  7. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect (OSTI)

    NONE

    1997-11-01

    This document contains organization charts for the U.S. Nuclear Regulatory Commission (NRC) and for the five offices of the NRC. Function statements are provided delineating the major responsibilities and operations of each office. Organization and function are provided to the branch level. The head of each office, division, and branch is also listed.

  8. Safety Culture in the US Nuclear Regulatory Commission's Reactor Oversight Process

    Broader source: Energy.gov [DOE]

    Presenter: Undine Shoop, Chief, Health Physics and Human Performance Branch, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission

  9. Assistant Director (Commissioned Officer)

    E-Print Network [OSTI]

    Matrajt, Graciela

    Manager Maintenance Sup. II Bldg & Grounds Sup. B Program Ops Specialist Maintenance & Construction Coord. Coordinator Parking Enforcement Officer 2 - FTE Budget Analyst Cashier .5 FTE Parking Operations Officer 8

  10. Federal Energy Regulatory Commission January 8, 2008

    E-Print Network [OSTI]

    Laughlin, Robert B.

    energy market crisis of 2000-2001 today by approving the $18 million settlement agreement between EnronFederal Energy Regulatory Commission FACT SHEET January 8, 2008 Enron-Snohomish PUD No.1 Docket No.FERC.gov The Federal Energy Regulatory Commission took another step in resolving the issues surrounding the Western

  11. New Forestry Commission District Office The new Forestry Commission

    E-Print Network [OSTI]

    New Forestry Commission District Office The new Forestry Commission District office at Smithton in construction The Forestry Commission's District office at Smithton in Inverness, Scotland, covers the national fuel heating system has proved effective during the winter of 2009/10, one of the harshest in 40 years

  12. US Nuclear Regulatory Commission Input to DOE Request for Information...

    Office of Environmental Management (EM)

    US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart...

  13. Occupational Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities 2010, Prepared for the Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, May 2012

    SciTech Connect (OSTI)

    D. E. Lewis D. A. Hagemeyer Y. U. McCormick

    2012-07-07

    This report summarizes the occupational exposure data that are maintained in the U.S. Nuclear Regulatory Commission’s (NRC) Radiation Exposure Information and Reporting System (REIRS). The bulk of the information contained in the report was compiled from the 2010 annual reports submitted by five of the seven categories of NRC licensees subject to the reporting requirements of 10 CFR 20.2206. Because there are no geologic repositories for high-level waste currently licensed and no NRC-licensed low-level waste disposal facilities currently in operation, only five categories will be considered in this report. The annual reports submitted by these licensees consist of radiation exposure records for each monitored individual. These records are analyzed for trends and presented in this report in terms of collective dose and the distribution of dose among the monitored individuals. Annual reports for 2010 were received from a total of 190 NRC licensees. The summation of reports submitted by the 190 licensees indicated that 192,424 individuals were monitored, 81,961 of whom received a measurable dose. When adjusted for transient workers who worked at more than one licensee during the year, there were actually 142,471 monitored individuals and 62,782 who received a measurable dose. The collective dose incurred by these individuals was 10,617 person-rem, which represents a 12% decrease from the 2009 value. This decrease was primarily due to the decrease in collective dose at commercial nuclear power reactors, as well as a decrease in the collective dose for most of the other categories of NRC licensees. The number of individuals receiving a measurable dose also decreased, resulting in an average measurable dose of 0.13 rem for 2010. The average measurable dose is defined as the total effective dose equivalent (TEDE) divided by the number of individuals receiving a measurable dose. In calendar year 2010, the average annual collective dose per reactor for light water reactor (LWR) licensees was 83 person-rem. This represents a 14% decrease from the value reported for 2009 (96 person-rem). The decrease in collective dose for commercial nuclear power reactors was due to an 11% decrease in total outage hours in 2010. During outages, activities involving increased radiation exposure such as refueling and maintenance are performed while the reactor is not in operation. The average annual collective dose per reactor for boiling water reactors (BWRs) was 137 personrem for 35 BWRs, and 55 person-rem for 69 pressurized water reactors (PWRs). Analyses of transient individual data indicate that 29,333 individuals completed work assignments at two or more licensees during the monitoring year. The dose distributions are adjusted each year to account for the duplicate reporting of transient individuals by multiple licensees. The adjustment to account for transient individuals has been specifically noted in footnotes in the figures and tables for commercial nuclear power reactors. In 2010, the average measurable dose per individual for all licensees calculated from reported data was 0.13 rem. Although the average measurable dose per individual from data submitted by licensees was 0.13 rem, a corrected dose distribution resulted in an average measurable dose per individual of 0.17 rem.

  14. Nuclear Regulatory Commission Issuances: February 1995. Volume 41, Number 2

    SciTech Connect (OSTI)

    NONE

    1995-02-01

    This book contains an issuance of the Nuclear Regulatory Commission and a Director`s Decision. The issuance concerns consideration by the Commission of appeals from both the Initial Decision and a Reconsideration Order issued by the Presiding Officer involving two materials license amendment applications filed by the University of Missouri. The Director`s Decision from the Office of Enforcement denies petitions filed by Northeast Utilities employees requesting that accelerated enforcement action be taken against Northeast Utilities for activities concerned with NU`s fitness-for-duty program.

  15. UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    i LBP-09-10 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING Nuclear Power Plant, Units 1 and 2) Docket No. 52-029-COL, 52-030-COL ASLBP No. 09-879-04-COL-BD01 July 8

  16. UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    LBP-09-04 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD In the Matter of CALVERT CLIFFS 3 NUCLEAR PROJECT, LLC, and UNISTAR NUCLEAR OPERATING SERVICES, LLC (Combined This case arises from an application by UniStar Nuclear Operating Services, LLC and Calvert Cliffs 3 Nuclear

  17. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SUPPLEMENTAL NOTICE OF PUBLIC SCOPING MEETINGS FOR THE PLANNED ALASKA LNG PROJECT (October 20, 2015) The staff of the Federal Energy Regulatory Commission (FERC or Commission) will...

  18. Department of Energy Commends the Nuclear Regulatory Commission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commission's Approval of a Second Early Site Permit in Just One Month Department of Energy Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit...

  19. U. S. Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1982-02-01

    Functional organization charts for the NRC Commission Offices, Divisions, Staffs and Branches are presented.

  20. U.S. NUCLEAR REGULATORY COMMISSION GUIDEOFFICE OF NUCLEAR REGULATORY RESEARCH

    E-Print Network [OSTI]

    Johnson, Eric E.

    U.S. NUCLEAR REGULATORY COMMISSION REGULATORY Revision 3 June 1999 GUIDEOFFICE OF NUCLEAR protection problems present in the work place." The Nuclear Regulatory Commission's (NRC's) regulations REGULATORY RESEARCH REGULATORY GUIDE 8.13 (Draft was issued as DG-801 4) INSTRUCTION CONCERNING PRENATAL

  1. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect (OSTI)

    1996-07-01

    This document is the US NRC organizational structure and chart as of July 1, 1996. It contains the org charts for the Commission, ACRS, ASLAB, Commission staff offices, Executive Director for Operations, Office of the Inspector General, Program offices, and regional offices.

  2. Commissioner George Apostolakis U.S. Nuclear Regulatory Commission

    E-Print Network [OSTI]

    Bernstein, Joseph B.

    Commissioner George Apostolakis U.S. Nuclear Regulatory Commission CmrApostolakis@nrc.gov 25th event occurs at a nuclear facility." [Commission's White Paper, February, 1999] · Questions that defense associated with current regulatory requirements 8 #12;Risk-Informed Framework 9 Traditional "Deterministic

  3. FORESTRY COMMISSION NATIONAL OFFICE FOR SCOTLAND

    E-Print Network [OSTI]

    or even a change of ownership need not alter the course of management. Response to natural `events' can be accommodated, as can changes in resources available. What is a Management Plan? Essentially, a management planFORESTRY COMMISSION NATIONAL OFFICE FOR SCOTLAND GUIDANCE NOTE NO 12 MANAGEMENT PLANS FOR SEMI

  4. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect (OSTI)

    NONE

    1996-08-19

    This document is the organizational chart for the US NRC. It contains organizational structure and functional statements for the following: (1) the Commission, (2) committees and boards, (3) staff offices, (4) office of the Inspector General, (5) executive director for operations, (6) program offices, and (7) regional offices.

  5. Regulatory Analysis on Criteria

    Office of Scientific and Technical Information (OSTI)

    1997 S . Schneider, S . A. McGuire Division of Regulatory Applications Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission Washington, DC 20555-0001...

  6. FERC hears gas industry concerns, announces Transco settlement. [Federal Energy Regulatory Commission

    SciTech Connect (OSTI)

    Rodgers, L.M.

    1991-07-01

    This article examines the industry comments on the Federal Energy Regulatory Commission's (FERC) notice of proposed rulemaking on natural gas pipeline function and comparability of service and the resolution of a charge of violations of regulations against the Transcontinental Gas Pipe Line Corporation by the FERC's Office of the General Council.

  7. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    This document provides functional organization charts for all NRC Offices and Regions, and their components.

  8. Nuclear Regulatory Commission's Integrated Strategy for Spent...

    Office of Environmental Management (EM)

    * DOE motion to withdraw in March 2010 2 * DOE motion to withdraw in March 2010 * Blue Ribbon Commission on America's Nuclear Future 2 Growing Spent Fuel Inventory Cumulative...

  9. U.S. ATOMIC ENERGY COMMISSION REGULATORY GUIDE

    E-Print Network [OSTI]

    U.S. ATOMIC ENERGY COMMISSION REGULATORY GUIDE DIRECTORATE OF REGULATORY STANDARDS JUNE 1974 OF OPERATING LICENSES FOR NUCLEAR REACTORS A. INTRODUCTION Section 50.51, "Duration of license, renewal," of 10 CFR Part 50, "Licensing of Production and Utilization Facilities," requires that each license

  10. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    entity manipulated short-term prices for electric energy or natural gas in the West or otherwiseUNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 105 FERC ¶ 61,008 Before Commissioners: Pat Wood, III, Chairman; William L. Massey, and Nora Mead Brownell. Reliant Energy Services, Inc

  11. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    of Electric and Natural Gas Prices Enron Power Marketing, Inc. and Enron Energy Services, Inc. Enron PowerUNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T of Energy and Ancillary Services Investigation of the Practices of the California Independent System

  12. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    -Finding Investigation Into Possible Manipulation of Electric and Natural Gas Prices PacifiCorp PPM Energy, Inc. (fUNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T Company v. Sellers of Energy and Ancillary Services Investigation of Practices of the California

  13. Nuclear Regulatory Commission Information Digest 1992 edition. Volume 4

    SciTech Connect (OSTI)

    Olive, K [ed.] [ed.

    1992-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. This digest is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and industry it regulates. In general, the data cover 1975 through 1991, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

  14. Nuclear Regulatory Commission Information Digest 1994 edition. Volume 6

    SciTech Connect (OSTI)

    Stadler, L.

    1994-03-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRCs regulatory responsibility the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear-and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1993, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

  15. Commission.

    National Nuclear Security Administration (NNSA)

    and the Nuclear Regulatory Commission. Highlights of the NMMSS 2014 Annual Users Training Meeting The Nuclear Materials Management and Safeguards System (NMMSS) Annual Users...

  16. Indexes to Nuclear Regulatory Commission issuances, July--September 1997

    SciTech Connect (OSTI)

    1998-03-01

    This digest and index lists the Nuclear Regulatory Commission (NRC) issuances for July to September 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. There are five sections to this index: (1) case name index, (2) headers and digests, (3) legal citations index, (4) subject index, and (5) facility index. The digest provides a brief narrative of the issue, including the resolution of the issue and any legal references used for resolution.

  17. Report to Congress:Impacts of the Federal Energy Regulatory Commission...

    Office of Environmental Management (EM)

    Energy Regulatory Commission (FERC), "Remedying Undue Discrimination through Open Access Transmission Service and Standard Electricity Market Design." Report to Congress:Impacts...

  18. Chief Information Officer

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission is looking for an experienced senior level executive to serve as the Chief Information Officer (CIO). The Chief Information Officer (CIO) reports directly...

  19. Nuclear Regulatory Commission issuances, October 1993. Volume 38, No. 4

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners` motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners` have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission`s Memorandum and Order are included.

  20. Navajo Hopi Land Commission Office (NHLCO): Navajo Hopi Land Commission Office (NHLCO)- 2012 Project

    Broader source: Energy.gov [DOE]

    The Navajo Hopi Land Commission (NHLCO), together with its partners, will conduct a feasibility study (FS) of a program to develop renewable energy on the Paragon-Bisti ranch lands in northwestern New Mexico, which were set aside under the Navajo-Hopi Land Settlement Act for the benefit of relocatees (defined as Navajo families living on Hopi Partitioned Lands as of December 22, 1974).

  1. U.S. NUCLEAR REGULATORY COMMISSION Revision 1 February 1996

    E-Print Network [OSTI]

    Rubloff, Gary W.

    and doses to members of the public that are as low as is reasonably achievable (ALARA), provides for planned REGULATORY RESEARCH REGULATORY GUIDE 8.29 (Draft was issued as DG-8012) INSTRUCTION CONCERNING RISKS FROM OCCUPATIONAL RADIATION EXPOSURE A. INTRODUCTION Section 19.12 of 10 CFR Part 19, "Notices, In- structions

  2. US Nuclear Regulatory Commission functional organization charts. Revision 6

    SciTech Connect (OSTI)

    Not Available

    1984-01-01

    The report consists entirely of organizational charts of the US NRC, with functional notes for each office. (GHT)

  3. Nuclear Regulatory Commission issuances. Volume 38, No. 2

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  4. Nuclear Regulatory Commission issuances, April 1994. Volume 39, No. 4

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  5. Nuclear Regulatory Commission Issuances. Volume 39, No. 2

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director`s Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  6. A Case Study of Retro Commissioning in a Standard Commercial Office Building in Japan 

    E-Print Network [OSTI]

    Kamitani, K.; Shimazu, M.; Inomata, N.

    2006-01-01

    This paper describes retro commissioning of a standard commercial office building in Japan. The owner's expectations for retro commissioning are realization of energy and cost savings, and controlling the increase in electric power demand, while...

  7. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    of section 5.4 of the Master Settlement Agreement (or MSA), a settlement agreement by and among El Paso and Settlement and Release of Claims Agreement (collectively, the Settlement) submitted to the Commission of a "Joint Explanatory Statement" and a "Settlement and Release of Claims Agreement" filed pursuant to Rule

  8. Nuclear Regulatory Commission issuances, Volume 45, No. 5

    SciTech Connect (OSTI)

    NONE

    1997-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  9. Nuclear Regulatory Commission issuances. Volume 46, Number 1

    SciTech Connect (OSTI)

    NONE

    1997-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  10. Nuclear Regulatory Commission issuances: Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1--December 31, 1996. Volume 44, Pages 1--432

    SciTech Connect (OSTI)

    1997-10-01

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. Issuances are referred to as follows: Commission--CLI, Atomic Safety and Licensing Boards--LBP, Administrative Law Judges--ALJ, Directors` Decisions--DD, and Decisions on Petitions for Rulemaking--DPRM.

  11. Nuclear Regulatory Commission Issuances. Volume 45, No. 3

    SciTech Connect (OSTI)

    NONE

    1997-03-01

    This report includes the issuances received in March 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. 10 issuances were received: Louisiana Energy Services (2 issuances); Illinois Power Company and Soyland Power Cooperative; Ralph. L. Tetrick; University of Cincinnati; Consumers Power Company; Entergy Operations, Inc.; Georgia Power Company; Westinghouse Electric Corporation; and Wisconsin Electric Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  12. Nuclear Regulatory Commission issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1994--December 31, 1994. Volume 40, Pages 1--387

    SciTech Connect (OSTI)

    NONE

    1994-12-31

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. This book covers the following: issuances of the NRC; issuances of the Atomic Safety and Licensing Boards; and issuances of Directors` decisions.

  13. From 1998 to 2000, through the Interagency Steering Committee on Radiation Standards (ISCORS), the U.S. Nuclear Regulatory Commission (NRC) and the U.S. Environmental

    E-Print Network [OSTI]

    Standards (ISCORS), the U.S. Nuclear Regulatory Commission (NRC) and the U.S. Environmental Protection

  14. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton; Kent Norris

    2009-12-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  15. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton; Kent Norris

    2010-03-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  16. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton

    2009-10-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  17. Improved cost-benefit techniques in the US Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Cronin, F.J.; Nesse, R.J.; Vaeth, M.; Wusterbarth, A.R.; Currie, J.W.

    1983-06-01

    The major objective of this report is to help the US Nuclear Regulatory Commission (NRC) in its regulatory mission, particularly with respect to improving the use of cost-benefit analysis and the economic evaluation of resources within the NRC. The objectives of this effort are: (1) to identify current and future NRC requirements (e.g., licensing) for valuing nonmarket goods; (2) to identify, highlight, and present the relevant efforts of selected federal agencies, some with over two decades of experience in valuing nonmarket goods, in this area; and (3) to review methods for valuing nonmarket impacts and to provide estimats of their magnitudes. Recently proposed legislation may result in a requirement for not only more sophisticated valuation analyses, but more extensive applications of these techniques to issues of concern to the NRC. This paper is intended to provide the NRC with information to more efficiently meet such requirements.

  18. Lessons Learned from Continuous Commissioning of the Robert E. Johnson State Office Building, Austin, TX 

    E-Print Network [OSTI]

    Bynum, J.; Claridge, D. E.

    2008-09-22

    or 5.6% annual whole building energy savings based on a DOE-2 simulation analysis. Three main lessons were learned from the experience with the Robert E. Johnson building: • The traditional design-construction-operation team must include... as the basis of this report. A special thanks to Dennis Feary of the General Service Commission of Austin, Texas, and Pam Groce and Felix Lopez of the State Energy Conservation Office. Page 3 of 6 Lessons Learned from Continuous Commissioning ®1...

  19. Project Reports for Navajo Hopi Land Commission Office (NHLCO): Navajo Hopi Land Commission Office (NHLCO)- 2012 Project

    Broader source: Energy.gov [DOE]

    The Navajo Hopi Land Commission (NHLCO), together with its partners, will conduct a feasibility study (FS) of a program to develop renewable energy on the Paragon-Bisti ranch lands in northwestern New Mexico, which were set aside under the Navajo-Hopi Land Settlement Act for the benefit of relocatees (defined as Navajo families living on Hopi Partitioned Lands as of December 22, 1974).

  20. Continuous Commissioning of a LEED-EB Gold Certified Office Building 

    E-Print Network [OSTI]

    McCown, P.

    2009-01-01

    A 320,000 square foot Class A high-rise office building in Nashville, TN achieved LEED-EB Gold Certification. LEED-EB version 2.0 was utilized, which requires Retro-Commissioning (RCx) as a prerequisite for certification. SSRCx performed the RCx...

  1. Independent Verification and Validation Of SAPHIRE 8 Risk Management Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2009-11-01

    This report provides an evaluation of the risk management. Risk management is intended to ensure a methodology for conducting risk management planning, identification, analysis, responses, and monitoring and control activities associated with the SAPHIRE project work, and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  2. NRC (Nuclear Regulatory Commission) staff evaluation of the General Electric Company Nuclear Reactor Study (''Reed Report'')

    SciTech Connect (OSTI)

    1987-07-01

    In 1975, the General Electric Company (GE) published a Nuclear Reactor Study, also referred to as ''the Reed Report,'' an internal product-improvement study. GE considered the document ''proprietary'' and thus, under the regulations of the Nuclear Regulatory Commission (NRC), exempt from mandatory public disclosure. Nonetheless, members of the NRC staff reviewed the document in 1976 and determined that it did not raise any significant new safety issues. The staff also reached the same conclusion in subsequent reviews. However, in response to recent inquiries about the report, the staff reevaluated the Reed Report from a 1987 perspective. This re-evaluation, documented in this staff report, concluded that: (1) there are no issues raised in the Reed Report that support a need to curtail the operation of any GE boiling water reactor (BWR); (2) there are no new safety issues raised in the Reed Report of which the staff was unaware; and (3) although certain issues addressed by the Reed Report are still being studied by the NRC and the industry, there is no basis for suspending licensing and operation of GE BWR plants while these issues are being resolved.

  3. Report to the Nuclear Regulatory Commission from the staff panel on the Commission's determination of an Extraordinary Nuclear Occurrence (ENO)

    SciTech Connect (OSTI)

    none,

    1980-01-01

    The Panel finds that the first criterion, pertaining to whether the accident caused a discharge of radioactive material or levels of radiation offsite as defined in 10 CFR 140.84, has not been met. It further finds that there is presently insufficient information to support any definitive finding as to whether or not the second criterion, relating to damage to persons or property offsite as defined in 10 CFR 140.85, has been met. Since the Panel has not found that both criteria have been met, it recommends that the Commission determine that the accident at Three Mile Island did not constitute an extraordinary nuclear occurrence.

  4. FINAL BIOLOGICAL OPINION AGENCY: U. S. Federal Energy Regulatory Commission, Washington, D. C.

    E-Print Network [OSTI]

    Hydroelectric Project (P-2153-012) CONSULTATION CONDUCTED BY: National Marine Fisheries Service, Southwest) for the Santa Felicia Hydroelectric Project, on Piru Creek, Los Angeles County. The Commission proposes to issue

  5. UNITED STATES OF AMERICA 108 FERC 61,114 FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    Commissioners: Pat Wood, III, Chairman; Nora Mead Brownell, and Joseph T. Kelliher. Sempra Energy Trading, 2004) 1. On October 31, 2003, Commission Trial Staff and Sempra Energy Trading Corporation (Sempra of the comments of the California Parties. Also on 1 American Electric Power Service Corporation, et al., 103 FERC

  6. Indexes to Nuclear Regulatory Commission issuances, January--June 1995. Volume 41, Index 2

    SciTech Connect (OSTI)

    NONE

    1995-09-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the directors` Decisions (DD), and the Denials of Petitions for rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. The information elements are displayed in one or more of five separate formats arranged as follows: Case name index; digests and headers; legal citations index; subject index; and facility index.

  7. U.S. Nuclear Regulatory Commission organization charts and functional statements. Revision 18

    SciTech Connect (OSTI)

    NONE

    1995-07-23

    This document (NUREG-0325) is the current US NRC organization chart, listing all NRC offices and regions and their components down through the branch level as of July 23, 1995. Functional statements of each position are given, as is the name of the individual holding the position.

  8. U.S. Nuclear Regulatory Commission Certifies HalfPACT Transportation Container

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking With WIPP UPDATE: AprilCubic Feet)MillionU.S. Nuclear Regulatory

  9. Case Study of Energy Diagnose and Re-commissioning in a Green Office Building 

    E-Print Network [OSTI]

    Zhang, Y.; Wei, Q.

    2006-01-01

    to design phase and generally ignore commissioning phase after construction. It leads an inefficiently facility management of HVAC systems and components. Energy diagnose and re-commissioning by on-site measurement can solve these problems, to improve...

  10. Indexes to Nuclear Regulatory Commission issuances, January--March 1995. Volume 41, Index 1

    SciTech Connect (OSTI)

    NONE

    1995-06-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.).

  11. U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and700, 1. .&. ' , c 1afr a . - 3 U.Lowman,-., *

  12. OVERVIEW OF THE U.S. DEPARTMENT OF ENERGY AND NUCLEAR REGULATORY COMMISSION PERFORMANCE ASSESSMENT APPROACHES: CEMENTITIOUS BARRIERS PARTNERSHIP

    SciTech Connect (OSTI)

    Langton, C.; Burns, H.

    2009-05-29

    Engineered barriers including cementitious barriers are used at sites disposing or contaminated with low-level radioactive waste to enhance performance of the natural environment with respect to controlling the potential spread of contaminants. Drivers for using cementitious barriers include: high radionuclide inventory, radionuclide characteristics (e.g., long half-live, high mobility due to chemical form/speciation, waste matrix properties, shallow water table, and humid climate that provides water for leaching the waste). This document comprises the first in a series of reports being prepared for the Cementitious Barriers Partnership. The document is divided into two parts which provide a summary of: (1) existing experience in the assessment of performance of cementitious materials used for radioactive waste management and disposal and (2) sensitivity and uncertainty analysis approaches that have been applied for assessments. Each chapter is organized into five parts: Introduction, Regulatory Considerations, Specific Examples, Summary of Modeling Approaches and Conclusions and Needs. The objective of the report is to provide perspective on the state of the practice for conducting assessments for facilities involving cementitious barriers and to identify opportunities for improvements to the existing approaches. Examples are provided in two contexts: (1) performance assessments conducted for waste disposal facilities and (2) performance assessment-like analyses (e.g., risk assessments) conducted under other regulatory regimes. The introductory sections of each section provide a perspective on the purpose of performance assessments and different roles of cementitious materials for radioactive waste management. Significant experience with assessments of cementitious materials associated with radioactive waste disposal concepts exists in the US Department of Energy Complex and the commercial nuclear sector. Recently, the desire to close legacy facilities has created a need to assess the behavior of cementitious materials for applications in environmental remediation and decontamination and decommissioning (D&D) applications. The ability to assess the use and benefits of cementitious materials for these applications can significantly affect decisions related to cleanup activities. For example the need for costly remedial actions may not be necessary if existing or new cementitious barriers were adequately represented. The sections dealing with regulatory considerations include summaries of the different regulations that are relevant for various applications involving cementitious materials. A summary of regulatory guidance and/or policies pertaining to performance assessment of cementitious materials and sensitivity and uncertainty analyses is also provided in the following chapters. Numerous examples of specific applications are provided in each report. The examples are organized into traditional waste disposal applications (performance assessments), applications related to environmental remediation and D&D, and reactor and spent fuel related assessments. Sections that discuss specific facilities or sites contain: (1) descriptions of the role of the cementitious barriers or sensitivity/uncertainty analysis, (2) parameter assumptions and conceptual models, and (3) a relative discussion of the significance in the context of the assessment. Examples from both the U.S. Department of Energy Sites and the U.S. Nuclear Regulatory Commission are provided to illustrate the variety of applications and approaches that have been used. In many cases, minimal credit was taken for cementitious barriers. However, in some of those cases, benefits of being able to take credit for barriers were identified. The examples included: (1) disposal facilities (vaults, trenches, tank closures, cementitious waste forms and containers, etc.), (2) environmental remediation (old disposal facilities), (3) reactor and large structure decommissioning, and (4) spent fuel pools. These examples were selected to provide a perspective on the various ne

  13. U.S. Nuclear Regulatory Commission Extremely Low Probability of Rupture pilot study : xLPR framework model user's guide.

    SciTech Connect (OSTI)

    Kalinich, Donald A.; Sallaberry, Cedric M.; Mattie, Patrick D.

    2010-12-01

    For the U.S. Nuclear Regulatory Commission (NRC) Extremely Low Probability of Rupture (xLPR) pilot study, Sandia National Laboratories (SNL) was tasked to develop and evaluate a probabilistic framework using a commercial software package for Version 1.0 of the xLPR Code. Version 1.0 of the xLPR code is focused assessing the probability of rupture due to primary water stress corrosion cracking in dissimilar metal welds in pressurizer surge nozzles. Future versions of this framework will expand the capabilities to other cracking mechanisms, and other piping systems for both pressurized water reactors and boiling water reactors. The goal of the pilot study project is to plan the xLPR framework transition from Version 1.0 to Version 2.0; hence the initial Version 1.0 framework and code development will be used to define the requirements for Version 2.0. The software documented in this report has been developed and tested solely for this purpose. This framework and demonstration problem will be used to evaluate the commercial software's capabilities and applicability for use in creating the final version of the xLPR framework. This report details the design, system requirements, and the steps necessary to use the commercial-code based xLPR framework developed by SNL.

  14. Vital area identification for U.S. Nuclear Regulatory Commission nuclear power reactor licensees and new reactor applicants.

    SciTech Connect (OSTI)

    Whitehead, Donnie Wayne; Varnado, G. Bruce

    2008-09-01

    U.S. Nuclear Regulatory Commission nuclear power plant licensees and new reactor applicants are required to provide protection of their plants against radiological sabotage, including the placement of vital equipment in vital areas. This document describes a systematic process for the identification of the minimum set of areas that must be designated as vital areas in order to ensure that all radiological sabotage scenarios are prevented. Vital area identification involves the use of logic models to systematically identify all of the malicious acts or combinations of malicious acts that could lead to radiological sabotage. The models available in the plant probabilistic risk assessment and other safety analyses provide a great deal of the information and basic model structure needed for the sabotage logic model. Once the sabotage logic model is developed, the events (or malicious acts) in the model are replaced with the areas in which the events can be accomplished. This sabotage area logic model is then analyzed to identify the target sets (combinations of areas the adversary must visit to cause radiological sabotage) and the candidate vital area sets (combinations of areas that must be protected against adversary access to prevent radiological sabotage). Any one of the candidate vital area sets can be selected for protection. Appropriate selection criteria will allow the licensee or new reactor applicant to minimize the impacts of vital area protection measures on plant safety, cost, operations, or other factors of concern.

  15. UNITED STATES OF AMERICA DEPARTMENT OF ENERGY OFFICE OF FOSSIL...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Direct Investment FE Office of Fossil Energy, U.S. Department of Energy FERC Federal Energy Regulatory Commission FLEX Freeport LNG Expansion, L.P., et al. FTA Free Trade...

  16. FERC Approves Two California Market Settlements The Federal Energy Regulatory Commission (FERC) took another step toward resolution of the issues

    E-Print Network [OSTI]

    Laughlin, Robert B.

    at the Commission's interest rate through Dec. 31, 2007. Strategic will allow the California Power Exchange (Cal

  17. FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    filings involving market pricing or rules; * modify: existing transmission or power exchange tariffs

  18. FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    . and approximately 30 other entities resolving claims arising from the parties' participation in the California Power Exchange (CalPX) and California Independent System Operator (CAISO) energy markets from May 1, 2000

  19. FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    million associated with Mirant's sales in the day-ahead market administered by the now-defunct Power Exchange. The agreement also addresses any interest due on the assigned funds. The agreement further calls

  20. FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    markets during the Western energy crisis of 2000-2001. The first case involves a settlement agreement Marketing LP in FERC proceedings arising from the Western energy crisis. The El Paso settlement is sponsored to finally resolving the lingering issues from the Western energy crisis and returning money to consumers

  1. NUCLEAR REGULATORY COMMISSION

    Office of Environmental Management (EM)

    under Part 73 is as follows: (1) The estimated date and time of departure from the point of origin of the shipment; (2) The estimated date and time of entry into the State;...

  2. Commissioning of A Large Office Building in Texas - A Case Study 

    E-Print Network [OSTI]

    Deng, S.; Turner, W. D.; Liu, M.

    2000-01-01

    water pumps were installed on the roof of a six-story, 141,514 ft^2 office building with very limited EMCS control. Some of the built-in chiller features such as staging and flow switch protection were unreliable due to age. Serious problems existed...

  3. Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  4. Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-02-01

    This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  5. A compilation of reports of the Advisory Committee on Reactor Safeguards, 1997 annual, U.S. Nuclear Regulatory Commission. Volume 19

    SciTech Connect (OSTI)

    NONE

    1998-04-01

    This compilation contains 67 ACRS reports submitted to the Commission, or to the Executive Director for Operations, during calendar year 1997. It also includes a report to the Congress on the NRC Safety Research Program. Specific topics include: (1) advanced reactor designs, (2) emergency core cooling systems, (3) fire protection, (4) generic letters and issues, (5) human factors, (6) instrumentation, control and protection systems, (7) materials engineering, (8) probabilistic risk assessment, (9) regulatory guides and procedures, rules, regulations, and (10) safety research, philosophy, technology and criteria.

  6. COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM

    E-Print Network [OSTI]

    COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM OVERALL PROGRAM GUIDEBOOK Sixth Edition Gonçalves Office Manager Renewable Energy Office Dave Ashuckian, P.E. Deputy Director Efficiency and Renewable Energy Division Robert P. Oglesby Executive Director The California Energy Commission formally

  7. How Regulatory Risk Has Moved Front and Center in the Tug-of-War between State Commissions and Public Utilities

    SciTech Connect (OSTI)

    Keglevic, Paul; McConomy, John; Koppin, John

    2006-11-15

    Deregulation of generation, volatile commodity markets and an increase in proposed utility mergers have heightened the stakes in the historic struggle of public service commissions to balance the interests of ratepayers and shareholders. The authors review this struggle and its impact on recent requests for rate increases and the pending approval of several mergers announced in the past few years. (author)

  8. United States Nuclear Regulatory

    E-Print Network [OSTI]

    United States Nuclear Regulatory Commission United States Department of Energy United States.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: DISTRIBUTION@nrc.gov Facsimile: 301; and Commission papers and their attachments. NRC publications in the NUREG series, NRC regulations, and Title 10

  9. Remedial action plan for the inactive uranium processing site at Naturita, Colorado. DOE responses to comments from U.S. Nuclear Regulatory Commission and Colorado Department of Public Health and Environment

    SciTech Connect (OSTI)

    NONE

    1998-11-16

    This report contains responses by the US Department of Energy to comments from the US Nuclear Regulatory Commission and the Colorado Department of Public Health and Environment on the Naturita remedial action plan. This was done in an attempt to clarify information. The site is an inactive uranium processing site at Naturita, Colorado.

  10. Energy Department Issues Request For Proposal for Nuclear Regulatory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement Energy Department Issues Request For Proposal for Nuclear Regulatory Commission Licensed...

  11. Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 4. Evaluation of other loads and load combinations

    SciTech Connect (OSTI)

    Not Available

    1984-12-01

    Six topical areas were covered by the Task Group on Other Dynamic Loads and Load Combinations as described below: Event Combinations - dealing with the potential simultaneous occurrence of earthquakes, pipe ruptures, and water hammer events in the piping design basis; Response Combinations - dealing with multiply supported piping with independent inputs, the sequence of combinations between spacial and modal components of response, and the treatment of high frequency modes in combination with low frequency modal responses; Stress Limits/Dynamic Allowables - dealing with inelastic allowables for piping and strain rate effects; Water Hammer Loadings - dealing with code and design specifications for these loadings and procedures for identifying potential water hammer that could affect safety; Relief Valve Opening and Closing Loads - dealing with the adequacy of analytical tools for predicting the effects of these events and, in addition, with estimating effective cycles for fatigue evaluations; and Piping Vibration Loads - dealing with evaluation procedures for estimating other than seismic vibratory loads, the need to consider reciprocating and rotary equipment vibratory loads, and high frequency vibratory loads. NRC staff recommendations or regulatory changes and additional study appear in this report.

  12. COMMISSION REPORT RENEWABLE ENERGY PROGRAM

    E-Print Network [OSTI]

    COMMISSION REPORT RENEWABLE ENERGY PROGRAM 2011 ANNUAL REPORT Authors Lorraine Gonzalez Madeleine Meade Project Manager Tony Gonçalves Office Manager Renewable Energy Office Panama Bartholomy Deputy Director Energy Efficiency and Renewables Division Robert Oglesby

  13. * Milepost Federal Energy Regulatory Commission

    Energy Savers [EERE]

    using the eLibrary link. Click on the eLibrary link, click on "General Search," and enter the docket number excluding the last three digits in the Docket Number field (i.e.,...

  14. UNITED STATES NUCLEAR REGULATORY COMMISSION

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and700, 1. .&. ' , c 1afr a . -Menxmmhmz 9 1

  15. * Milepost Federal Energy Regulatory Commission

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i p a l De p u t y A s s i s t a n t S e c r eEnergyHVACSecond

  16. Nuclear Regulatory Commission authorization for Fiscal Year 1981. Hearing before the Subcommittee on Energy and Power of the Committee on Interstate and Foreign Commerce, House of Representatives, Ninety-Sixth Congress, Second Session. [Committee print

    SciTech Connect (OSTI)

    Not Available

    1980-01-01

    The statements of eleven witnesses from the Nuclear Regulatory Commission (NRC) presented at a Congressional hearing on February 22, 1980 are reproduced along with additional material submitted for the record. At issue was the NRC's authorization request for fiscal year 1981. The testimony included a review of 1979 activities, including the Three Mile Island accident, and an agenda for future action. Budget justifications were made on the basis of these proposals. Committee members challenged NRC witnesses on their performance, state personnel recruitment and training, public safety, and other matters. (DCK)

  17. Authority of states of use section 401 water quality certification to deny or condition Federal Energy Regulatory Commission licenses. Master's thesis

    SciTech Connect (OSTI)

    Hart, E.O.

    1994-09-01

    This thesis discusses a recent United States Supreme Court case that will have a profound influence on the licensure of hydroelectric projects and the related ability of States to protect the quality of their waters. On October 4, 1993, the Supreme Court granted a Writ of Certiorari to resolve a conflict among the state courts of last resort. This case involves two fundamental and competing national interests: the nation's thirst for cheap, dependable power versus its equally strong desire to improve the quality of its water resources. It also involves two underlying regulatory regimes that overlap and conflict with each other in some ways. This case illustrates how those two national interests and their underlying regulatory regimes cannot always be reconciled. It also demonstrates how Congress, with its muddled ways of passing legislation, can create conflicts between federal and state regulatory agencies.

  18. Student Trainee (Administrative and Office Support)

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission (FERC) is an independent regulatory agency that regulates and oversees various aspects of the energy markets within the United States. We value independence...

  19. Commissioning Process

    Broader source: Energy.gov [DOE]

    The commissioning process for Federal facilities generally follows a four-step process. This process holds true across all forms of commissioning and for both new and existing buildings.

  20. OFFICE,

    Office of Legacy Management (LM)

    OFFICE, . . . . . ..-... --.-... .-..I... ..-... bUmME. wArl&l ' rrsldu*. in the dw6lopmQt pmgrwh : Be ostiamts Uuat not man lf+ .b%'o,Qds. cik'e%ah of the...

  1. Nuclear Regulatory Commission Sunshine Act regulations. Hearing before the Subcommittee on Energy Conservation and Power of the Committee on Energy and Commerce, House of Representatives, Ninety-Ninth Congress, First Session, May 21, 1985

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    Nuclear Regulatory Commissioners and staff and representatives of Resources for the Future, Center for the Study of Responsive Law, and the Union of Concerned Scientists testified at a hearing held in response to a changed Commission meeting format allowing secret gatherings that would not have a formal transcript or written record for later assessment. Critics of the NRC's new regulation were opposed to both the concept of secret meetings and the fact that the Commissioners approved the plan without public comment. NRC Chairman Palladino countered that the change conforms with congressional intent as interpreted by the Supreme Court in a 1984 decision involving the Sunshine Act. At issue was the intent of the commissioners and the importance of public participation in the decision making process. Additional material submitted for the record follows the testimony of 12 witnesses.

  2. Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 2. Evaluation of seismic designs: a review of seismic design requirements for Nuclear Power Plant Piping

    SciTech Connect (OSTI)

    Not Available

    1985-04-01

    This document reports the position and recommendations of the NRC Piping Review Committee, Task Group on Seismic Design. The Task Group considered overlapping conservation in the various steps of seismic design, the effects of using two levels of earthquake as a design criterion, and current industry practices. Issues such as damping values, spectra modification, multiple response spectra methods, nozzle and support design, design margins, inelastic piping response, and the use of snubbers are addressed. Effects of current regulatory requirements for piping design are evaluated, and recommendations for immediate licensing action, changes in existing requirements, and research programs are presented. Additional background information and suggestions given by consultants are also presented.

  3. May 22, 2015 LAB COMMISSION MEETING MINUTES

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its ninth meeting at 9:00 AM on May 22, 2015. Commission Co-Chair Jared Cohon led the meeting. The meeting included discussion with lab directors; technology transfer coordinators; Bay area industrial partners; and site office management. The discussion was followed by an opportunity for public comment.

  4. Vice Dean Regulatory Affairs

    E-Print Network [OSTI]

    Chisholm, Rex L.

    Vice Dean Regulatory Affairs Chief Compliance Officer Robert M. Rosa, MD Landsberg Dean Eric G. Neilson, MD Departments, Centers and InsCtutes McGaw Medical Center ExecuCve Director, Individual Giving Larry Kuhn Associate Dean

  5. Hybrid Simulation of the Seismic Response of Squat Reinforced Concrete Shear Walls

    E-Print Network [OSTI]

    Whyte, Catherine Alexandra

    2012-01-01

    in 1980 when the Nuclear Regulatory Commission’s Office ofthis site from the Nuclear Regulatory Commission (NRC). They

  6. Office of the Assistant General Counsel for Civilian Nuclear...

    Broader source: Energy.gov (indexed) [DOE]

    of Nuclear Materials and Non-HLW Nuclear Fuel Cycle Energy Research and Development Non-Proliferation Nuclear Regulatory Commission Regulatory and Licensing Matters Nuclear...

  7. RADIOLOGICAL EMERGENCY RESPONSE PLANNING FOR NUCLEAR POWER PLANTS IN CALIFORNIA. VOLUME 4 OF THE FINAL REPORT ON HEALTH AND SAFETY IMPACTS OF NUCLEAR, GEOTHERMAL, AND FOSSIL-FUEL ELECTRIC GENERATION IN CALIFORNIA

    E-Print Network [OSTI]

    Yen, W.W.S.

    2010-01-01

    6, November~ U. S. Nuclear Regulatory Commission. Title 10,1974·. U. S. Nuclear Regulatory Commission. Office ofJanuary 1977. U. S. Nuclear Regulatory Commission. Office of

  8. Sandia Energy - Federal Electric Regulatory Commission Revised...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Small Generator Interconnection Agreement Home Renewable Energy Energy Grid Integration Partnership News Distribution Grid Integration SunShot News & Events Photovoltaic...

  9. Federal Energy Regulatory Commission December 21, 2007

    E-Print Network [OSTI]

    Laughlin, Robert B.

    Operator, Inc. (CAISO) and the California Power Exchange (CalPX) during the period Jan. 16, 1997, through

  10. NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and MyersHr.EvaluationJune~ofOF OHlONEW* .t-* .

  11. NUCLEAR REGULATORY,.COMMISSION REGION I

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and MyersHr.EvaluationJune~ofOF OHlONEW* .t-*

  12. Regulatory Commission of Alaska | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EIS Report UrlNM-b <Refurbished Projects Wind

  13. UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the WeldonB100 Ambrosia'1(DOE)F. a%UCRL-53628 .D

  14. Federal Energy Regulatory Commission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButtePowerEdisto Electric Coop,ErosionNewCoalFarmland

  15. EVALUATION REPORT The Federal Energy Regulatory Commission's

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based|DepartmentStatementofApril 25,EV Everywhere and

  16. Nuclear Regulatory Commission Regulatory and Licensing Matters | Department

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergy Managing853926 News enDepartment of Energy101Navy Unitedof

  17. Continuous Commissioning® 

    E-Print Network [OSTI]

    Culp, C.; Claridge, D. E.

    2011-01-01

    and Verification ? Keep Commissioning Continuous ? Involve On-site Staff Opportunity Assessor - OA Utility Bills Questionnaire Electricity (kWh) Gas (MMBtu) March 2010 160,350 418 April 2010 165,420 398 May 2010 171,353 391 1.Area = 172,000 ft2 2....Windows = 25% to 35% 3.OA %= 15 to 30% 4. Fan = VAV ..... Estimated % Energy Cost Savings Yes No Go to Next Building Good Opportunity? - Use WinAM to Determine Measures in Detailed Assessment Opportunity Assessor ? Determine building?s...

  18. California Department of Fish and Wildlife: Federal Energy Regulatory...

    Open Energy Info (EERE)

    California Department of Fish and Wildlife: Federal Energy Regulatory Commission (FERC) Hydroelectric Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  19. Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory...

    Office of Legacy Management (LM)

    111989 Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia. Pennsylvania 19406 Dear Mr. Kinneman: -;' .-. 'W...

  20. Nuclear regulatory legislation, 104th Congress. Volume 2, No. 4

    SciTech Connect (OSTI)

    1997-12-01

    This document is the second of two volumes compiling statutes and material pertaining to nuclear regulatory legislation through the 104th Congress, 2nd Session. It is intended for use as a U.S. Nuclear Regulatory Commission (NRC) internal resource document. Legislative information reproduced in this document includes portions of the Paperwork Reduction Act, various acts pertaining to low-level radioactive waste, the Clean Air Act, the Federal Water Pollution Control Act, the National Environmental Policy Act, the Hazardous Materials Transportation Act, the West Valley Demonstration Project Act, Nuclear Non-Proliferation and Export Licensing Statutes, and selected treaties, agreements, and executive orders. Other information provided pertains to Commissioner tenure, NRC appropriations, the Chief Financial Officers Act, information technology management reform, and Federal civil penalties.

  1. PREGWRK.doc (rev. 07-13) Office of Radiation Safety, MC-3930

    E-Print Network [OSTI]

    -13) STAFF DECLARATION OF PREGNANCY Confidential Document The United States Nuclear Regulatory Commission at a uniform rate of no more than 50 mrem (0.5 mSv) per month. As required by the Nuclear Regulatory Commission

  2. Types of Commissioning

    Broader source: Energy.gov [DOE]

    Several commissioning types exist to address the specific needs of equipment and systems across both new and existing buildings. The following commissioning types provide a good overview.

  3. River Basin Commissions (Indiana)

    Broader source: Energy.gov [DOE]

    This legislation establishes river basin commissions, for the Kankakee, Maumee, St. Joseph, and Upper Wabash Rivers. The commissions facilitate and foster cooperative planning and coordinated...

  4. Office of Security and Emergency Operations Office of Safeguards...

    National Nuclear Security Administration (NNSA)

    Orlando, Florida-May 23-25, 2006 Sponsored by the U.S. Department of Energy & the U.S. Nuclear Regulatory Commission NM M SS NM M SS NM M SS NM M SS Federal Information System...

  5. United States United States EPA 832-R-99-900 Environmental Protection Nuclear Regulatory March 1999

    E-Print Network [OSTI]

    is composed of representatives from the Environmental Protection Agency, Nuclear Regulatory CommissionUnited States United States EPA 832-R-99-900 Environmental Protection Nuclear Regulatory March 1999 Regulatory Commission (NRC) contract laboratory, the Oak Ridge Institute for Science & Education (ORISE

  6. Continuous Commissioning® of an Office Building 

    E-Print Network [OSTI]

    Zheng, B.; Liu, M.; Pang, X.; Wang, J.; Hansen, K.

    2005-01-01

    recommendations were developed. The major CC measures included: optimizing terminal box minimum flow set point, modifying the interior zone fan control sequence of the parallel fan powered boxes, improving the VAV air handler supply fan and return fan... on January 27, 2005. In Figure 7a and 7b, at occupied hours, the airflow difference between supply fan and return fan was two times of that at unoccupied hours because all four handlers were on during occupied hours and only two air handlers were...

  7. FORESTRY COMMISSION NATIONAL OFFICE FOR SCOTLAND

    E-Print Network [OSTI]

    of the proposals. If you have any doubts on whether the requirements in this guidance note apply to your project design. Forest Landscape Design Guidelines - Price £5.75 Lowland Landscape Design Guidelines - Price £9.95 Community Woodland Design Guidelines - Price £9.75 These publications are available from HMSO Bookshops

  8. Potential Benefits of Commissioning California Homes

    E-Print Network [OSTI]

    This work was supported by the Assistant Secretary for Energy Efficiency and Renewable Energy, OfficeLBNL-48258 Potential Benefits of Commissioning California Homes Nance Matson, Craig Wray, Iain Walker, Max Sherman Environmental Energy Technologies Division Energy Performance of Buildings Group

  9. Distributed Energy System Validation, Commissioning and

    E-Print Network [OSTI]

    Distributed Energy System Validation, Commissioning and Qualification Test Report Prepared Agreement No. DE-FC26-06NT42847 Hawai`i Distributed Energy Resource Technologies for Energy Security Subtask for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under Cooperative

  10. Proceedings of the Joint Russian-American Hydrogeology Seminar, Berkeley, CA, July 8-9, 1997

    E-Print Network [OSTI]

    Tsang, Chin-Fu

    2010-01-01

    and the U.S. Nuclear Regulatory Commission, Office ofand the U.S. Nuclear Regulatory Commission, Office ofRegulatory Res. U.S. Nuclear Regulatory Commission Mail Stop

  11. Regulatory and technical reports (abstract index journal): Annual compilation for 1996, Volume 21, No. 4

    SciTech Connect (OSTI)

    Sheehan, M.A.

    1997-04-01

    This compilation is the annual cumulation of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors.

  12. Regulatory and technical reports (abstract index journal). Second quarter 1996, April--June

    SciTech Connect (OSTI)

    Sheehan, M.A.

    1996-08-01

    This report contains bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (US NRC) staff and it`s contractors.

  13. The Paradox of Regulatory Development in China: The Case of the Electricity Industry

    E-Print Network [OSTI]

    Tsai, Chung-min

    2010-01-01

    zhongguo dianli chanye (China‘s Electricity Industry at themulti_page.pdf. State Electricity Regulatory Commission.The Annual Report on Electricity Regulation (2006). Beijing:

  14. Lisa C. Tracy Acting Director Division of Natural Gas Regulatory...

    Broader source: Energy.gov (indexed) [DOE]

    November 17, 2014 Lisa C. Tracy Acting Director Division of Natural Gas Regulatory Activities U.S. Department of Energy (FE-34) Office of Oil and Gas Global Security Office of...

  15. Guidelines for residential commissioning

    SciTech Connect (OSTI)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to such houses.

  16. Energy/Environment/Commissioning 

    E-Print Network [OSTI]

    Nakahara, N.

    2006-01-01

    Nobuo NakaharaNobuo Nakahara ICEBO/APCBCAsia Pacific Conference on Building Commissioning 2006.11.7 Opening AddressOpening AddressEnergy/Environment/CommissioningEnergy/Environment/Commissioning Call for Call for partipationpartipation...%45%42%39%36%15%10%10%9%9%7%12%13%14%15%12%18%19%20%21%4%4%5%5%6%1%4%4%5%5%4%5%5%6%7% 02,0004,0006,0008,00010,00012,00014,00016,00018,00019712002201020202030 ?????????? 5,53610,34512,19414,40416,487OECD?????????????????????????????? ????IEA/World Energy Outlook 2004 Actual and Estimated Energy Demand in the World Africa Middle East...

  17. FORESTRY COMMISSION Mechanical Engineering Services

    E-Print Network [OSTI]

    1 FORESTRY COMMISSION Mechanical Engineering Services TENDER SALE of surplus Forestry Commission to be in £ Sterling. 3. Tenders will be subject to VAT @ 20% 4. The Forestry Commission reserves the right

  18. Commissioning for High Performance 

    E-Print Network [OSTI]

    Meline, K.

    2013-01-01

    Councils ? BREEAM • Estidama ? Pearl Rating System • World Green Building Council ? No independent rating system ESL-KT-13-12-46 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 COMMISSIONING Commonality in All...

  19. University of Hawaii Environmental Health and Safety Office

    E-Print Network [OSTI]

    the University include but not limited to: Federal - Environmental Protection Agency (EPA), Nuclear Regulatory and reporting regulatory agency inspections at the University of Hawaii. Regulatory agencies that may inspect Commission (NRC), Department of Defense (DOD), Homeland Security State - Department of Health (DOH

  20. Switzerland Suisse Swiss Geodetic Commission Commission Godsique Suisse

    E-Print Network [OSTI]

    Giger, Christine

    Switzerland Suisse Swiss Geodetic Commission Commission Géodésique Suisse Swiss National Report;#12;Switzerland Suisse Swiss Geodetic Commission Commission Géodésique Suisse Swiss National Report Switzerland http://www.sgc.ethz.ch/publications Edited by: J. Mueller-Gantenbein, Secretary of the SGC A

  1. August 1999 Radiation Safety Manual Section 2 Licensing and Regulatory Controls

    E-Print Network [OSTI]

    Sniadecki, Nathan J.

    Nuclear Regulatory Commission (NRC) has entered into a formal agreement with the State of WashingtonAugust 1999 Radiation Safety Manual Section 2 ­ Licensing and Regulatory Controls UW Environmental Health and Safety Page 2-1 Section 2 Licensing and Regulatory Controls Contents A. Regulations

  2. 8.13-8.13-1 REGULATORY GUIDE 8.13

    E-Print Network [OSTI]

    Kay, Mark A.

    present in the work place." The Nuclear Regulatory Commission's (NRC's) regulations on radiation8.13-8.13-1 Revision 3 JUNE 1999 REGULATORY GUIDE 8.13 (Draft was issued as DG-8014) INSTRUCTION of conception. This regulatory guide is intended to provide information to pregnant women, and other personnel

  3. Prepared for the U.S. Department of Energy under Contract DE-AC05-76RL01830

    E-Print Network [OSTI]

    Job Code V6237 U.S. Nuclear Regulatory Commission Office of Nuclear Regulatory Research Washington, D

  4. Texas General Land Office Construction Certificate and Dune Protection...

    Open Energy Info (EERE)

    OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Checklist: Texas General Land Office Construction Certificate and Dune Protection Permit Requirements...

  5. Recommended Procedures for Measuring Radon Fluxes from

    E-Print Network [OSTI]

    of Waste Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission

  6. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Area Power Administration's (Western) Rate Schedule SNF-7, for a non-firm power formula rate applicable to the Washoe Project, Stampede Division (Washoe Project). 1 The...

  7. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    not adequate to meet repayment criteria. Western further explains that the proposed formula rates are designed to yield approximately 1.96 billion from October 2011 through...

  8. Department of Energy and Nuclear Regulatory Commission Increase...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Energy Partnership Department of Energy to Award 16 Million for GNEP Studies United States, France and Japan Increase Cooperation on Sodium-Cooled Fast Reactor Prototypes...

  9. Energy Praises the Nuclear Regulatory Commission Approval of...

    Energy Savers [EERE]

    way we power this nation - nuclear power will play an increasingly important role as the demand for electricity grows worldwide. "Government's role is to create an environment in...

  10. UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C...

    Office of Scientific and Technical Information (OSTI)

    m Hardware Maintenance E r r o r Modes R e a c t o r p r o t e c t i o n 7 3 3 2 4 ( a ) Vapor s u p p r e s s i o n : Large LOCA S m a l l LOCA 100 100 Emergency c o o l a n t i...

  11. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    and the California Power Exchange, Respondents. Docket No. EL00-95-000, et al. Investigation of Practices of the California Independent System Operator and the California Power Exchange Docket No. EL00-98-000, et al of California v. British Columbia Power Exchange Corp., Coral Power, LLC, Dynegy Power Marketing, Inc., Enron

  12. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    System Operator Corporation and the California Power Exchange Investigation of Practices of the California Independent System Operator and the California Power Exchange Docket No. EL00-95-000, et al. EL00 in the captioned proceedings relating to APX's participation in the markets of the California Power Exchange

  13. Nuclear Regulatory Commission Proceedings: A Guide for Intervenors

    E-Print Network [OSTI]

    Hansell, Dean

    1982-01-01

    License for Floating Nuclear Power Plants). The requirements207 (1978) (Floating Nuclear Power Plants). 101. Early site

  14. US Nuclear Regulatory Commission Input to DOE Request for Information...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comments relevant to the following two sections of the RFI: "Long Term Issues: Managing a Grid with High Penetration of New Technologies" and "Reliability and Cyber-Security," US...

  15. DOE Awards Contract for the Nuclear Regulatory Commission (NRC...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Center (INTEC) in Idaho; and management of the Idaho Spent Fuel Facility (ISFF) license. This is a hybrid type contract with Firm-Fixed-Price (FFP), Indefinite Delivery...

  16. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    and/or Capacity Investigation of Anomalous Bidding Behavior and Practices in Western Markets Fact for electric capacity, energy, and/or ancillary services in the Western Electricity Coordinating Council. Kelliher, Chairman; Suedeen G. Kelly, Philip D. Moeller, and Jon Wellinghoff. San Diego Gas & Electric

  17. Nuclear Regulatory Commission issuances, July 1996: Volume 44, No. 1

    SciTech Connect (OSTI)

    1996-07-01

    This report includes the issuances received during this period from NRC, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking.

  18. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Philip D. Moeller, John R. Norris, Cheryl A. LaFleur, and Tony T. Clark. Iberdrola Renewables, Inc. PacifiCorp NextEra Energy Resources, LLC Invenergy Wind North America LLC...

  19. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-Sessions | Department of Correctiveof Deliverables UDACSmart Grid Docket No.FERC

  20. Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory Commission

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and MyersHr.EvaluationJune~of theOfll s' :y0

  1. UNITED STATES NUCLEAR REGULATORY COMMISSION WAWINGTON. D. C. 20555

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and700, 1. .&. ' , c 1afr a . -Menxmmhmz 9

  2. UNITED STATES NUCLEAR REGULATORY COMMISSION WAWINQTON, 0. C. ZOSSS

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and700, 1. .&. ' , c 1afr a . -Menxmmhmz

  3. Department of Energy Commends the Nuclear Regulatory Commission's Approval

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-in electricLaboratory |Education at U.S.DevelopmentRadiation Protection andof

  4. Department of Energy and Nuclear Regulatory Commission Increase Cooperation

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-in electricLaboratoryof Energy Eleven sites toFutureGen 2.0 in Illinois

  5. Energy Praises the Nuclear Regulatory Commission Approval of the First

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLfor Innovative Solar PowerTribesDepartmentEnergyNovember 6,TheUnited

  6. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Financing ToolInternationalReport FY 2009, AnnualEnergy A.I.D. HigherUL Ex ParteDAVID N.FEB 1

  7. UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20556

    Office of Scientific and Technical Information (OSTI)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield MunicipalTechnicalInformation4563 LLNL Small-scale Friction Sensitivity (BAM) Test .

  8. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking With WIPP UPDATE:Administrationfollowing tableUNITED

  9. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking With WIPP UPDATE:Administrationfollowing tableUNITED FERC ¶

  10. Federal Energy Regulatory Commission's Fiscal Year 2010 Financial Statement Audit

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015Executive Order14, 20111,FYDepartment of5!National Electric

  11. Federal Energy Regulatory Commission's Fiscal Year 2014 Financial Statement Audit

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015Executive Order14, 20111,FYDepartment of5!National Electric4 Financial

  12. Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties -DepartmentAvailable forSite |n t e g r8480094626 Federal867770110

  13. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsStateofEnergy FuelFEDERAL ENERGYCorpus Christi

  14. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsStateofEnergy FuelFEDERAL ENERGYCorpus ChristiGulf LNG

  15. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsStateofEnergy FuelFEDERAL ENERGYCorpus ChristiGulf

  16. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsStateofEnergy FuelFEDERAL ENERGYCorpus ChristiGulfPort

  17. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsStateofEnergy FuelFEDERAL ENERGYCorpus

  18. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsStateofEnergy FuelFEDERAL ENERGYCorpusNOTICE OF PUBLIC

  19. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsStateofEnergy FuelFEDERAL ENERGYCorpusNOTICE OF

  20. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsStateofEnergy FuelFEDERAL ENERGYCorpusNOTICE

  1. ORISE: U.S. Nuclear Regulatory Commission Radiation Exposure Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesseworkSURVEY UNIVERSEHow ORISE is MakingScienceOakHistorical Climatologyand

  2. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann Jackson About1996HowFOAShowing YouNeedof Energy FishMANAGEMENT AnnualNNSAIDOEFEDERAL

  3. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann Jackson About1996HowFOAShowing YouNeedof Energy FishMANAGEMENT

  4. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann Jackson About1996HowFOAShowing YouNeedof Energy FishMANAGEMENTAMERICA BEFORE THE

  5. Sandia Energy - Federal Electric Regulatory Commission Revised Its Small

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation of Fe(II) byMultidayAlumniProjectsCyberNotLEDPhaseFacilities Home

  6. DOE Awards Contract for the Nuclear Regulatory Commission (NRC) Licensed

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-in electric vehicle10 DOE ASSESSMENTathasBestI) AprilSupport Services

  7. Federal Communications Commission FCC 02-48 Federal Communications Commission

    E-Print Network [OSTI]

    Federal Communications Commission FCC 02-48 Before the Federal Communications Commission Washington-Wideband Transmission Systems ) ) ) ) ) ) ET Docket 98-153 FIRST REPORT AND ORDER Adopted: February 14, 2002 Released. Imaging Systems

  8. California Energy Commission CONSULTANT REPORT

    E-Print Network [OSTI]

    roofs and the energy requirement for renovated lighting systems to meet the new 2013 energyCalifornia Energy Commission CONSULTANT REPORT IMPACT ANALYSIS California's 2013 Building Energy Efficiency Standards JULY 2013 CEC4002013008 CALIFORNIA ENERGY COMMISSION Edmund G. Brown Jr

  9. STATE OF CALIFORNIA -NATURAL RESOURCES AGENCY CALIFORNIA ENERGY COMMISSION

    E-Print Network [OSTI]

    STATE OF CALIFORNIA - NATURAL RESOURCES AGENCY CALIFORNIA ENERGY COMMISSION 151 6 NINTH STREET SACRAMENTO, CA 95814-551 2 www.energy.ca.gov Buildings Technologies Program Building Energy Codes Program Manager U.S. Department of Energy August 7, 2013 Office of Energy Efficiency and Renewable Energy

  10. Retrospective Testing of an Automated Building Commissioning Analysis Tool (ABCAT) 

    E-Print Network [OSTI]

    Claridge, D. E.; Lin, G.

    2009-01-01

    in identifying the possible cause(s) of the problem. This report presents the results of a retrospective implementation of ABCAT on five buildings, each of which consists of offices, classrooms and laboratories and has at least three years of post commissioning...

  11. A Guide to Building Commissioning

    SciTech Connect (OSTI)

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  12. Regulatory analysis technical evaluation handbook. Final report

    SciTech Connect (OSTI)

    NONE

    1997-01-01

    The purpose of this Handbook is to provide guidance to the regulatory analyst to promote preparation of quality regulatory analysis documents and to implement the policies of the Regulatory Analysis Guidelines of the US Nuclear Regulatory Commission (NUREG/BR-0058 Rev. 2). This Handbook expands upon policy concepts included in the NRC Guidelines and translates the six steps in preparing regulatory analyses into implementable methodologies for the analyst. It provides standardized methods of preparation and presentation of regulatory analyses, with the inclusion of input that will satisfy all backfit requirements and requirements of NRC`s Committee to Review Generic Requirements. Information on the objectives of the safety goal evaluation process and potential data sources for preparing a safety goal evaluation is also included. Consistent application of the methods provided here will result in more directly comparable analyses, thus aiding decision-makers in evaluating and comparing various regulatory actions. The handbook is being issued in loose-leaf format to facilitate revisions. NRC intends to periodically revise the handbook as new and improved guidance, data, and methods become available.

  13. Response to "Analysis of the Treatment, by the U.S. Department of Energy, of the FEP Hydrothermal Activity in the Yucca Mountain Performance Assessment" by Yuri Dublyansky

    E-Print Network [OSTI]

    Houseworth, J.E.

    2010-01-01

    Press. NRC (U.S. Nuclear Regulatory Commission) 2003. YuccaD.C. : U.S. Nuclear Regulatory Commission, Office of Nuclear

  14. Badge Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Badge Office Badge Office The central point where badges are issued to employees and official visitors. Contact Badge Office (505) 667-6901 Email Badge Office location As the...

  15. ATOMIC ENERGY COMMISSION C

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsicloudden Documentation DataStreamsTotalproposals duenationalMeeting - JuneCOMMISSION C

  16. Utility Conservation Programs: A Regulatory and Design Framework 

    E-Print Network [OSTI]

    Norland, D. L.; Wolf, J. L.

    1986-01-01

    PROGRAMS: A REGULATORY AND DESIGN FRAMEWORK*+ Douglas L. Norland James L. Wolf Alliance to Save Energy Washington, D.C. ABSTRACT Investing in opportunities to conserve electricity is frequently very economic to the energy user. Often, it also... initiative or required by a public service commission, raises several issues of public policy that must be carefully examined. First, a regulatory framework is necessary to ensure compatibility between the design of a con servation program and its...

  17. Regulatory Aspects of ISM

    Broader source: Energy.gov [DOE]

    Presenter: Patricia Worthington, PhD, Director, Office of Health and Safety, Office of Health, Safety and Security

  18. CONTROL OF POPULATION DENSITIES SURROUNDING NUCLEAR POWER PLANTS. VOLUME 5 OF THE FINAL REPORT ON HEALTH AND SAFETY IMPACTS OF NUCLEAR, GEOTHERMAL, AND FOSSIL-FUEL ELECTRIC GENERATION IN CALIFORNIA

    E-Print Network [OSTI]

    Nero, jA.V.

    2010-01-01

    Distribution." U.S. Nuclear Regulatory Commission. Office ofBranch, U.S. Nuclear Regulatory Commission. U.S. WaterLBL-5287. U.S. Nuclear Regulatory Commission Standard Review

  19. THERMODYNAMIC TABLES FOR NUCLEAR WASTE ISOLATION, V.1: AQUEOUS SOLUTIONS DATABASE

    E-Print Network [OSTI]

    Phillips, S.L.; Hale, F.V.; Silvester, L.F.

    2008-01-01

    J. Tesoriero U. S. Nuclear Regulatory Commission Office ofDISTRIBUTION U.S. Nuclear Regulatory Commission, Division ofBrowning U.S. Nuclear Regulatory Commission Technical Review

  20. Building Commissioning in the USA 

    E-Print Network [OSTI]

    Castro, N.; Friedman, H.

    2006-01-01

    $50 billion/yr for energy? Cx energy savings range: 6% - 9% ? California Market Characterization Study (2000) ? RCx energy savings range: 7% - 30 % ? LBNL study: The Cost-Effectiveness of Commissioning New and Existing Commercial Buildings: Lessons... Commissioning in the USA Natascha Castro, Annex 47- US Team Leader National Institute of Standards and Technology Hannah Friedman, Cost-Benefit Subtask Leader Portland Energy Conservation, Inc. Asian Pacific Conference on Building Commissioning November 7, 2006...

  1. California Energy Commission STAFF REPORT

    E-Print Network [OSTI]

    California Energy Commission STAFF REPORT FINAL EVALUATION REPORT 2008 Building Energy the evaporator coil by drilling of Temperature Measurement Access Holes for the placement of temperature sensors

  2. Rappahannock River Basin Commission (Virginia)

    Broader source: Energy.gov [DOE]

    The Rappahannock River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the...

  3. Vehicle Technologies Office Merit Review 2014: Pennsylvania Partnership for Promoting Natural Gas Vehicles

    Broader source: Energy.gov [DOE]

    Presentation given by Delaware Valley Regional Planning Commission at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about...

  4. NRC Regulatory Agenda quarterly report, July--September 1993. Volume 12, No. 3

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The NRC Regulator Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter.

  5. Commissioning Plan RM

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustments (BillionProvedTravel TravelChallenges |1-01 Audit|3:Analysis: ForEnergy'stheEnergyOfficeCheckout,

  6. Regulatory Oversight Program, July 1, 1993--March 3, 1997. Volume 2: Appendices

    SciTech Connect (OSTI)

    1997-12-31

    On July, 1993, a Regulatory Oversight (RO) organization was established within the US DOE, Oak Ridge Operations to provide regulatory oversight of the DOE uranium enrichment facilities leased to the United States Enrichment Corporation (USEC). The purpose of the OR program was to ensure continued plant safety, safeguards and security while the plants were transitioned to regulatory oversight by the Nuclear Regulatory Commission (NRC). Volume 2 contains copies of the documents which established the relationship between NRC, DOE, USEC, and DOL (Dept of Labor) required to facilitate regulatory oversight transition.

  7. California Energy Commission ADOPTED REGULATIONS

    E-Print Network [OSTI]

    and Energy Division 2. State Energy Resources Conservation and Development Commission Chapter 4. Energy Resources Code Section 25402.10, for disclosing energy use data and ENERGY STAR® Energy Performance ScoresCalifornia Energy Commission ADOPTED REGULATIONS FEBRUARY 2013 CEC-400-2010-004-CMF

  8. California Energy Commission STAFF REPORT

    E-Print Network [OSTI]

    Fuel and Vehicle Technology Program Under Solicitation PON-09-604 #12;CALIFORNIA ENERGY COMMISSION impacts report assesses and reports on the potential localized health impacts of this additional fuelCalifornia Energy Commission STAFF REPORT MAY 2011 CEC-600-2010-009-AD2 LOCALIZED HEALTH IMPACTS

  9. Codes and standards and other guidance cited in regulatory documents

    SciTech Connect (OSTI)

    Nickolaus, J.R.; Bohlander, K.L.

    1996-08-01

    As part of the U.S. Nuclear Regulatory Commission (NRC) Standard Review Plan Update and Development Program (SRP-UDP), Pacific Northwest National Laboratory developed a listing of industry consensus codes and standards and other government and industry guidance referred to in regulatory documents. The SRP-UDP has been completed and the SRP-Maintenance Program (SRP-MP) is now maintaining this listing. Besides updating previous information, Revision 3 adds approximately 80 citations. This listing identifies the version of the code or standard cited in the regulatory document, the regulatory document, and the current version of the code or standard. It also provides a summary characterization of the nature of the citation. This listing was developed from electronic searches of the Code of Federal Regulations and the NRC`s Bulletins, Information Notices, Circulars, Enforcement Manual, Generic Letters, Inspection Manual, Policy Statements, Regulatory Guides, Standard Technical Specifications and the Standard Review Plan (NUREG-0800).

  10. Commissioning and Retro Commissioning Programs for Energy Efficiency 

    E-Print Network [OSTI]

    Kuklarni, A.

    2011-01-01

    to customer identifying inefficiencies and suggested improvements ? Vendor provided trends and savings analysis as per IPMVP protocols (Option B or Option C) www.powerofaction.com/efficiency 15 Monitoring Based Commissioning Approach Submit Pre...

  11. Department of Energy Carlsbad Field Office

    E-Print Network [OSTI]

    ) Transuranic (TRU) Waste in shielded containers in the Waste Isolation Pilot Plant (WIPP). RH TRU waste can/hour. The containers will be transported to WIPP in the Nuclear Regulatory Commission-certified HalfPACT transportation in the WIPP Waste Information System, and the volume ofthe waste will be counted against the limit of 250

  12. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Washington. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Washinton State Constitution grants authority to the legislature to regulate railroads and other common carriers as well as telegraph and telephone companies in the state. No section of the constitution expressly provides for the regulation of electric, gas, water, or heating utilities. The authority to regulate public utilities is vested generally in the Utilities and Transportation Commission, formerly designated at the Public Service Commission. The Commission is composed of three members appointed by the governor, with the consent of the senate. The term of office for commissioners is six years. Recently enacted legislation provides for the implementation of tax incentives to encourage the development of cogeneration facilities in the state. This plan is to be administered by the Department of Revenue in conjunction with the Energy Office. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  13. Status of activities on the inactive uranium mill tailings sites remedial action program. Office of the Assistant Secretary for Environment

    SciTech Connect (OSTI)

    Not Available

    1981-04-01

    This report on the status of the Office of Environment's program for inactive uranium mill tailings sites is an analysis of the current status and a forecast of future activities of the Office of Environment. The termination date for receipt of information was September 30, 1980. Aerial radiological surveys and detailed ground radiological assessments of properties within the communities in the vicinity of the designated processing sites in Canonsburg, Pennsylvania, Salt Lake City, Utah, and Boise, Idaho led to the designation of an initial group of vicinity properties for remedial action. The potential health effects of the residual radioactive materials on or near these properties were estimated, and the Assistant Secretary for Environment recommended priorities for performing remedial action to the Department's Assistant Secretary for Nuclear Energy. In designating these properties and establishing recommended priorities for performing remedial action, the Office of Environment consulted with the Environmental Protection Agency, the Nuclear Regulatory Commission, representatives from the affected State and local governments, and individual property owners. After notifying the Governors of each of the affected States and the Navajo Nation of the Secretary of Energy's designation of processing sites within their areas of jurisdiction and establishment of remedial action priorities, a Sample Cooperative Agreement was developed by the Department in consultation with the Nuclear Regulatory Commission and provided to the affected States and the Navajo Nation for comments. During September 1980, a Cooperative Agreement with the Commonwealth of Pennsylvania for the designated Canonsburg processing site was executed by the Department. It is anticipated that a Cooperative Agreement between the State of Utah and the Department to perform remedial actions at the designated Salt Lake City site will be executed in the near future.

  14. California Energy Commission STAFF REPORT

    E-Print Network [OSTI]

    California Energy Commission STAFF REPORT DRAFT EVALUATION REPORT Proposed Compliance Option of temperature sensors. Section RA3.2.2.2.2 of the reference appendices specifies the location and hole

  15. California Energy Commission STAFF REPORT

    E-Print Network [OSTI]

    on the potential localized health impacts of this additional fuel production project recommendedCalifornia Energy Commission STAFF REPORT MARCH 2011 CEC-600-2010-004-AD Awarded Funding Through the Alternative and Renewable Fuel and Vehicle Technology

  16. California Energy Commission STAFF REPORT

    E-Print Network [OSTI]

    on the potential localized health impacts of this additional fuel production project recommendedCalifornia Energy Commission STAFF REPORT MARCH 2011 CEC-600-2010-009-AD Projects Awarded Funding Through the Alternative and Renewable Fuel and Vehicle

  17. Orlando Utilities Commission- Solar Programs

    Broader source: Energy.gov [DOE]

    The Orlando Utilities Commission (OUC) also offers incentive for solar hot water heating systems. Commercial solar hot water heating systems receive a $0.03 per kWh equivalent. Residential...

  18. Rivanna River Basin Commission (Virginia)

    Broader source: Energy.gov [DOE]

    The Rivanna River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the Rivanna River...

  19. Wisconsin SRF Electron Gun Commissioning

    SciTech Connect (OSTI)

    Bisognano, Joseph J.; Bissen, M.; Bosch, R.; Efremov, M.; Eisert, D.; Fisher, M.; Green, M.; Jacobs, K.; Keil, R.; Kleman, K.; Rogers, G.; Severson, M.; Yavuz, D. D.; Legg, Robert A.; Bachimanchi, Ramakrishna; Hovater, J. Curtis; Plawski, Tomasz; Powers, Thomas J.

    2013-12-01

    The University of Wisconsin has completed fabrication and commissioning of a low frequency (199.6 MHz) superconducting electron gun based on a quarter wave resonator (QWR) cavity. Its concept was optimized to be the source for a CW free electron laser facility. The gun design includes active tuning and a high temperature superconducting solenoid. We will report on the status of the Wisconsin SRF electron gun program, including commissioning experience and first beam measurements.

  20. Delmarva- Commissioning and Operations Incentive Programs

    Broader source: Energy.gov [DOE]

    Delmarva's Enhanced Commissioning Program offers building design and commissioning incentives to commercial, industrial, governmental and institutional customers planning large new buildings....

  1. PEPCO- Commissioning and Operations Incentive Programs

    Broader source: Energy.gov [DOE]

    Pepco's Enhanced Commissioning Program offers building design and commissioning incentives to commercial, industrial, governmental and institutional customers planning large new buildings....

  2. Energy Department Highlights Commissioning of Innovative Fuel...

    Energy Savers [EERE]

    Highlights Commissioning of Innovative Fuel Cell System at U.S. Army's Aberdeen Proving Ground Energy Department Highlights Commissioning of Innovative Fuel Cell System at U.S....

  3. Portland Community College Celebrates Commissioning of Combined...

    Energy Savers [EERE]

    Portland Community College Celebrates Commissioning of Combined Heat and Power Fuel Cell System Portland Community College Celebrates Commissioning of Combined Heat and Power Fuel...

  4. Colorado Ground Water Commission | Open Energy Information

    Open Energy Info (EERE)

    Colorado Ground Water Commission Jump to: navigation, search Name: Colorado Ground Water Commission Place: Colorado Website: water.state.co.usgroundwater References: Colorado...

  5. VAV System Optimization through Continuous Commissioning in an Office Building 

    E-Print Network [OSTI]

    Cho, Y.; Pang, X.; Liu, M.

    2007-01-01

    to the Tower building through a heat exchanger. The system is shown in Figure 4. System CC ® Terminal boxes - Reset minimum primary airflow Solve building thermal comfort issue by fixing box mechanical problem - Reset duct static pressure - Reset... boxes involve resetting the minimum primary airflow and fixing the box mechanical problems to achieve building thermal comfort. BOILER HEAT EXCHANGER H.C. H.C. Existing schedule: The terminal boxes were originally tested and balanced...

  6. UNITED STATES ATOMIC ENERGY COMMISSION CHICAGO OPERATIONS OFFICE

    Office of Legacy Management (LM)

    samples showed elevated count rates. It is concluded that this was probably a counting system anomaly and not due to the presence of Co-60. Coils and cooling tubes from the...

  7. Continuous Commissioning® of an Office/Laboratory Building 

    E-Print Network [OSTI]

    Evans, C.; Cordero, J.; Atencio, M.; Claridge, D. E.; Martinez, J.; Oberle, C.; Baltazar-Cervantes, J. C.; Zhu, Y.

    2005-01-01

    , V.K., 1983. Automatic calibration of conceptual rainfall-runoff models - the question of parameter observability and uniqueness, Water Resources Res., 19 (1): 260- 268. Subbarao, K., Burch, J., Hancock, C.E., Lekov, A., Balcomb, J.D., 1990... scheme using multicriteria methods, J. Geophysical Research- Atmospheres, 104 (D16): 19491-19503. Gupta, H.V., Sorooshian, S., Yapo, P.O., 1998. Toward improved calibration of hydrologic models: Multiple and noncommensurable measures of information...

  8. UNITED STATES ATOMIC ENERGY COMMISSION CHICAGO OPERATIONS OFFICE

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and700, 1. .&. ' , c 1afr a . - 3=A-;

  9. UNITED STATES ATOMIC ENERGY COMMISSION Iew York Operation8 Office

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and700, 1. .&. ' , c 1afr a . - 3=A-;fi ' J/ui :

  10. UNITED STATES ATOMIC ENERGY COMMISSION CHICAGO OPERATIONS OFFICE

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the WeldonB100 Ambrosia'1(DOE)F. a%UCRL-53628 . .

  11. UNITED STATES ATOMIC ENERGY COMMISSION NEVADA OPERATIONS OFFICE

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReport for the WeldonB100 Ambrosia'1(DOE)F. a%UCRL-53628 . .UNITED

  12. Campus Sustainability Office Campus Planning Office

    E-Print Network [OSTI]

    Elzanowski, Marek

    Campus Sustainability Office (CSO) Campus Planning Office (CPO) Campus Sustainability Manager (Molly Bressers) Campus Sustainability Office and Campus Planning Office May 2015 Student Employee (Thea

  13. Environmental externalities: A survey of state commission actions

    SciTech Connect (OSTI)

    Cohen, S.D.; Eto, J.H. [National Association of Regulatory Utility Commissioners, Washington, DC (United States); Goldman, C.A. [Lawrence Berkeley Lab., CA (United States); Beldock, J. [USDOE Assistant Secretary for Conservation and Renewable Energy, Washington, DC (United States). Office of Buildings and Community Systems; Crandall, G. [MSB Associates, Middleton, WI (United States)

    1990-05-01

    Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC`s Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a ``snapshot`` of regulatory developments in an area that is evolving rapidly. 16 refs.

  14. Environmental externalities: A survey of state commission actions

    SciTech Connect (OSTI)

    Cohen, S.D.; Eto, J.H. (National Association of Regulatory Utility Commissioners, Washington, DC (United States)); Goldman, C.A. (Lawrence Berkeley Lab., CA (United States)); Beldock, J. (USDOE Assistant Secretary for Conservation and Renewable Energy, Washington, DC (United States). Office of Buildings and Community Systems); Crandall, G. (MSB Associates, Middleton, WI (United States))

    1990-05-01

    Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC's Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a snapshot'' of regulatory developments in an area that is evolving rapidly. 16 refs.

  15. CMTA Office

    High Performance Buildings Database

    Prospect, KY When CMTA outgrew their old office space, the consultant engineering company decided to construct a new building. Not only does the structure provide offices for the firm, it also showcases progressive design elements and allows the firm to test new technologies and demonstrate their effectiveness to clients. The new CMTA office building is located in a live-work development on the outskirts of Louisville, KY. The location was selected to place the office close to where the employees live.

  16. Natural Gas Regulatory Policy: Current Issues 

    E-Print Network [OSTI]

    Watkins, G.

    1988-01-01

    stream_source_info ESL-IE-88-09-56.pdf.txt stream_content_type text/plain stream_size 1211 Content-Encoding ISO-8859-1 stream_name ESL-IE-88-09-56.pdf.txt Content-Type text/plain; charset=ISO-8859-1 NATURAL GAS... REGULATORY roLICY: CURRENT ISSUES G. GAIL WATKINS Railroad Commission of Texas Austin, Texas ABSTRACT Many changes have occurred in recent months in both federal and state natural gas regulation. Those changes have increased the options of industrial...

  17. NGNP Project Regulatory Gap Analysis for Modular HTGRs

    SciTech Connect (OSTI)

    Wayne Moe

    2011-09-01

    The Next Generation Nuclear Plant (NGNP) Project Regulatory Gap Analysis (RGA) for High Temperature Gas-Cooled Reactors (HTGR) was conducted to evaluate existing regulatory requirements and guidance against the design characteristics specific to a generic modular HTGR. This final report presents results and identifies regulatory gaps concerning current Nuclear Regulatory Commission (NRC) licensing requirements that apply to the modular HTGR design concept. This report contains appendices that highlight important HTGR licensing issues that were found during the RGA study. The information contained in this report will be used to further efforts in reconciling HTGR-related gaps in the NRC licensing structure, which has to date largely focused on light water reactor technology.

  18. President Office Vice President Office

    E-Print Network [OSTI]

    Wu, Yih-Min

    Affairs Division Computer Information Management Division Media Instruction and Production Center Division Campus Security Supplies Office Office of Research and Development Planning Section and Waste Control Division Radiation Protection Division Biological Pollution Control Division #12

  19. Environmental Regulatory Update Table, May/June 1992

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Lewis, E.B.; Salk, M.S.

    1992-07-01

    This report contains a bi-monthly update of environmental regulatory activity that is of interest to the Department of Energy. It is provided to DOE operations and contractor staff to assist and support environmental management programs by tracking regulatory developments. Any proposed regulation that raises significant issues for any DOE operation should be reported to the Office of Environmental Guidance (EH-23) as soon as possible so that the Department can make its concerns known to the appropriate regulatory agency. Items of particular interest to EH-23 are indicated by a shading of the RU{number_sign}.

  20. Environmental Regulatory Update Table, May/June 1992

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Lewis, E.B.; Salk, M.S.

    1992-07-01

    This report contains a bi-monthly update of environmental regulatory activity that is of interest to the Department of Energy. It is provided to DOE operations and contractor staff to assist and support environmental management programs by tracking regulatory developments. Any proposed regulation that raises significant issues for any DOE operation should be reported to the Office of Environmental Guidance (EH-23) as soon as possible so that the Department can make its concerns known to the appropriate regulatory agency. Items of particular interest to EH-23 are indicated by a shading of the RU{number sign}.

  1. Regulatory cross-cutting topics for fuel cycle facilities.

    SciTech Connect (OSTI)

    Denman, Matthew R.; Brown, Jason; Goldmann, Andrew Scott; Louie, David

    2013-10-01

    This report overviews crosscutting regulatory topics for nuclear fuel cycle facilities for use in the Fuel Cycle Research&Development Nuclear Fuel Cycle Evaluation and Screening study. In particular, the regulatory infrastructure and analysis capability is assessed for the following topical areas:Fire Regulations (i.e., how applicable are current Nuclear Regulatory Commission (NRC) and/or International Atomic Energy Agency (IAEA) fire regulations to advance fuel cycle facilities)Consequence Assessment (i.e., how applicable are current radionuclide transportation tools to support risk-informed regulations and Level 2 and/or 3 PRA) While not addressed in detail, the following regulatory topic is also discussed:Integrated Security, Safeguard and Safety Requirement (i.e., how applicable are current Nuclear Regulatory Commission (NRC) regulations to future fuel cycle facilities which will likely be required to balance the sometimes conflicting Material Accountability, Security, and Safety requirements.)

  2. ENVIRONMENTAL ASSESSMENT/REGULATORY IMPACT REVIEW/ FINAL REGULATORY FLEXIBILITY ANALYSIS

    E-Print Network [OSTI]

    ENVIRONMENTAL ASSESSMENT/REGULATORY IMPACT REVIEW/ FINAL REGULATORY FLEXIBILITY ANALYSIS.0 NEPA REQUIREMENTS: ENVIRONMENTAL IMPACTS OF THE ALTERNATIVES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 2.1 Environmental Impacts of the Alternatives

  3. National Commission for Further and

    E-Print Network [OSTI]

    Neirotti, Juan Pablo

    improvement in the management of the quality of higher education. To this end, QM carries out reviews of UK Where appropriate and possible, in operations relating to quality assurance of higher education within the Quality Assurance Agency for Higher Education, United Kingdom and the National Commission for Further

  4. Forestry Commission Sale of Timber

    E-Print Network [OSTI]

    .e. the trees to be left standing after harvesting operation. Purchasers will be deemed to have acquainted of the Harvesting Site Plan from relevant Forest District Managers for each standing sale. These plans detail with the provisions of the Forestry Commission's Forests and Water Guidelines publication and to ensure

  5. California Energy Commission STAFF REPORT

    E-Print Network [OSTI]

    energy, gasoline, diesel, jet fuel, ethanol, E85, propane, biodiesel, transportation fuel demand, demandCalifornia Energy Commission STAFF REPORT TRANSPORTATION FUEL PRICE CASES AND DEMAND SCENARIOS methods and inputs to be used for preparing long-term transportation energy demand scenarios. Price

  6. INTERNATIONAL COMMISSION ON LARGE DAMS

    E-Print Network [OSTI]

    Bowles, David S.

    Q76-R INTERNATIONAL COMMISSION ON LARGE DAMS 20TH CONGRESS BEIJING, CHINA THE STATUS OF METHODS FOR ESTIMATION OF THE PROBABILITY OF FAILURE OF DAMS FOR USE IN QUANTITATIVE RISK ASSESSMENT (* ) Robin FELL. INTRODUCTION The use of Quantitative Risk Assessment (QRA) techniques to assist in dam safety management

  7. Nuclear regulatory legislation, 104th Congress, Volume 1, No. 4

    SciTech Connect (OSTI)

    1997-12-01

    This document is the first of two volumes compiling statutes and material pertaining to nuclear regulatory legislation through the 104th Congress, 2nd Session. It is intended for use as a U.S. Nuclear Regulatory Commission (NRC) internal resource document. Legislative information reproduced in this document includes portions of the Atomic Energy Act, Energy Reorganization Act, Low-Level Radioactive Waste Policy Amendments Act, and Nuclear Waste Policy Act. Other information included in this volume pertains to NRC user fees, NRC authorizations, the Inspector General Act, and the Administrative Procedure Act.

  8. Navajo-Hopi Land Commission Renewable Energy Development Project (NREP)

    SciTech Connect (OSTI)

    Thomas Benally, Deputy Director,

    2012-05-15

    The Navajo Hopi Land Commission Office (NHLCO), a Navajo Nation executive branch agency has conducted activities to determine capacity-building, institution-building, outreach and management activities to initiate the development of large-scale renewable energy - 100 megawatt (MW) or larger - generating projects on land in Northwestern New Mexico in the first year of a multi-year program. The Navajo Hopi Land Commission Renewable Energy Development Project (NREP) is a one year program that will develop and market a strategic business plan; form multi-agency and public-private project partnerships; compile site-specific solar, wind and infrastructure data; and develop and use project communication and marketing tools to support outreach efforts targeting the public, vendors, investors and government audiences.

  9. Building Technologies Office Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Roland Risser Director, Building Technologies Office Building Technologies Office Energy Efficiency Starts Here. 2 Building Technologies Office Integrated Approach: Improving...

  10. Office for Analysis and Evaluation of Operational Data. 1992 annual report: Nonreactors: Volume 7, No. 2

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC`s Operations Center. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued for 1981--1992.

  11. Office for Analysis and Evaluation of Operational Data 1996 annual report. Volume 10, Number 1: Reactors

    SciTech Connect (OSTI)

    1997-12-01

    This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1996. The report is published in three parts. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports and reports to the NRC`s Operations Center. NUREG-1272, Vol. 10, No. 2, covers nuclear materials and presents a review of the events and concerns during 1996 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from CY 1980 through 1996. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission in 1996.

  12. Commission.

    National Nuclear Security Administration (NNSA)

    in this invaluable learning opportunity. NMMSS is the U.S. Government's official information system containing current and historical accounting data and other related nuclear...

  13. Commission.

    National Nuclear Security Administration (NNSA)

    Security Site (NNSS), formerly known as the Nevada Test Site (NTS). Below are some pictures of the tour groups at the Nevada National Security Site. Page 4 April 2014 November...

  14. Commission.

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouthReporteeo | National NuclearaCSGFNuclear SecurityCommanding

  15. Commission.

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal GasAdministration Medal01 Sandia National 1 PAGE 1 OF2Guidance to the1 1Combined

  16. Commission.

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal GasAdministration Medal01 Sandia National 1 PAGE 1 OF2Guidance to the1 1CombinedMarch

  17. Using Simulation Models for Building Commissioning 

    E-Print Network [OSTI]

    Claridge, D. E.

    2004-01-01

    The International Energy Agency ECBCS Annex 40 “Commissioning of Buildings and HVAC Systems for Improved Energy Performance” task investigating Use of Whole Building Simulation in Commissioning has identified the following applications of whole...

  18. Blue Ribbon Commission Tour of Hanford Site

    ScienceCinema (OSTI)

    Paul Saueressig

    2010-09-01

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  19. Blue Ribbon Commission Tour of Hanford Site

    SciTech Connect (OSTI)

    Paul Saueressig

    2010-07-14

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  20. Flathead Basin Commission Act of 1983 (Montana)

    Broader source: Energy.gov [DOE]

    This Act establishes the Flathead Basin Commission, the purpose of which is to protect the Flathead Lake aquatic environment, its waters, and surrounding lands and natural resources. The Commission...

  1. River Basins Advisory Commissions (South Carolina)

    Broader source: Energy.gov [DOE]

    The Catawba/Wateree and Yadkin/Pee Dee River Basins Advisory Commissions are permanent public bodies jointly established by North and South Carolina. The commissions are responsible for assessing...

  2. Transcript of See Action and Technical Assistance Program Webcast: Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Office (DOE) of Energy Efficiency and Renewable Energy (EERE) transcript of See Action and Technical Assistance Program Webcast: Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings.

  3. Attorney-Adviser (Public Utilities)

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commissions Division of Investigations, within the Office of Enforcement, is responsible for the enforcement of the Commissions statutes, orders, and rules governing...

  4. Armando Fana Miami Field Office Director

    E-Print Network [OSTI]

    Fernandez, Eduardo

    Armando Fana Miami Field Office Director HUD Programs #12;HUD's Role HUD provides a variety and their use of the Federal HUD funds ­ FHA ­ Technical assistance ­ Enforcement of fair housing rights methods, healthy homes, energy efficiency, regulatory barrier reduction) #12;HUD's Role Outreach

  5. PP-54 Ontario Hydro Electric Power Commission | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PP-54 Ontario Hydro Electric Power Commission PP-54 Ontario Hydro Electric Power Commission Presidential Permit authorizing Ontario Hydro Electric Power Commission to construct,...

  6. Sustainability Performance Office | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sustainability Performance Office Sustainability Performance Office Sustainability Performance Office Sustainability Performance Office Sustainability Performance Office...

  7. Building Technologies Office Overview

    SciTech Connect (OSTI)

    2013-04-01

    Building Technologies Office Overview Presentation for the 2013 Building Technologies Office's Program Peer Review

  8. Office of Chief Financial Officer

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-01-19

    This Order implements the provisions of the Chief Financial Officers Act of 1990 within the Department of Energy. Cancels SEN 34-91. Canceled by DOE O 520.1A.

  9. Codes and standards and other guidance cited in regulatory documents. Revision 1

    SciTech Connect (OSTI)

    Ankrum, A.; Nickolaus, J.; Vinther, R.; Maguire-Moffitt, N.; Hammer, J.; Sherfey, L.; Warner, R. [Pacific Northwest Lab., Richland, WA (United States)

    1994-08-01

    As part of the US Nuclear Regulatory Commission (NRC) Standard Review Plan Update and Development Program, Pacific Northwest Laboratory developed a listing of industry consensus codes and standards and other government and industry guidance referred to in regulatory documents. In addition to updating previous information, Revision 1 adds citations from the NRC Inspection Manual and the Improved Standard Technical Specifications. This listing identifies the version of the code or standard cited in the regulatory document, the regulatory document, and the current version of the code or standard. It also provides a summary characterization of the nature of the citation. This listing was developed from electronic searches of the Code of Federal Regulations and the NRC`s Bulletins, Information Notices, Circulars, Generic Letters, Policy Statements, Regulatory Guides, and the Standard Review Plan (NUREG-0800).

  10. Regulatory Oversight Program, July 1, 1993--March 3, 1997. Volume 3

    SciTech Connect (OSTI)

    NONE

    1997-12-31

    On July, 1993, a Regulatory Oversight (RO) organization was established within the US DOE, Oak Ridge Operations (ORO) to provide regulatory oversight of the DOE uranium enrichment facilities leased to the United States Enrichment Corporation (USEC). The purpose of the OR program was to ensure continued plant safety, safeguards and security while the plants were transitioned to regulatory oversight by the Nuclear Regulatory Commission (NRC). Volume 3 contains copies of two reports that document the DOE/ORO regulatory oversight inspection and enforcement history for each gaseous diffusion plant site. Each report provides a formal mechanism by which DOE/ORO could communicate the inspection and enforcement history to NRC. The reports encompass the inspection activities that occurred during July 1, 1993 through March 2, 1997.

  11. EPAct Transportation Regulatory Activities

    SciTech Connect (OSTI)

    2011-11-21

    The U.S. Department of Energy's (DOE) Vehicle Technologies Program manages several transportation regulatory activities established by the Energy Policy Act of 1992 (EPAct), as amended by the Energy Conservation Reauthorization Act of 1998, EPAct 2005, and the Energy Independence and Security Act of 2007 (EISA).

  12. Monitoring- Based Commissioning with Advanced EMIS Analysis 

    E-Print Network [OSTI]

    Ratkovich, B.

    2013-01-01

    ?Based?Commissioning? with?Advanced?EMIS?Analysis Boban?Ratkovich,?MEng,?PEng,?CEM,?BESA,?LEED?AP President Presentation?Overview 1. Monitoring?Based?Commissioning?Objective? 2. Definition?of?Monitoring?Based?Commissioning?(MBCx) 3. MBCx ? Value?Added?Proposal? 4. MBCx...,?targeting?LEED?Gold ? High?performance?envelope ? BAS?integrated?lighting?with?occ? sensor?and?photocell?control ? VAV?Energy?Recovery?Ventilators? with?VFDs?and?occ?sensor?enabling ? Reversible?ASHPs?with?condensing? boiler...

  13. Fellows' Officers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HABFES OctoberEvan Racah861May 2011AprilOfficers Fellows' Officers

  14. New Prague Utilities Commission - Commercial & Industrial Energy...

    Broader source: Energy.gov (indexed) [DOE]

    per year, per technology Program Info Sector Name Utility Administrator New Prague Utilities Commission Website http:www.SaveEnergyInNewPrague.com State Minnesota Program Type...

  15. Energy Project Development, Finance, and Commissioning Resources...

    Office of Environmental Management (EM)

    for which they were originally designed. These tests are performed during both the heating and cooling seasons. Retro-commissioning is performed on these same MEP systems in...

  16. Demand Response Programs Oregon Public Utility Commission

    E-Print Network [OSTI]

    Demand Response Programs Oregon Public Utility Commission January 6, 2005 Mike Koszalka Director;Demand Response Results, 2004 Load Control ­ Cool Keeper ­ ID Irrigation Load Control Price Responsive

  17. Office for Analysis and Evaluation of Operational Data 1994-FY 95 annual report. Volume 9, Number 2

    SciTech Connect (OSTI)

    NONE

    1996-09-01

    This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during CY 1994 and FY 1995. The report is published in three parts. NUREG-1272, Vol. 9, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC`s Operations Center. NUREG-1272, Vol. 9, No. 2, covers nuclear materials and presents a review of the events and concerns associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from 1980 through FY 1995. NUREG-1272, Vol. 9, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission.

  18. Office for Analysis and Evaluation of Operational Data 1992 annual report: Power reactors. Volume 7, No. 1

    SciTech Connect (OSTI)

    1993-07-01

    The annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance, measures. The report also includes the principal findings and issues identified in AEOD studies over the past year, and summarizes information from such sources as licensee event report% diagnostic evaluations, and reports to the NRC`s Operations Center. The reports contain a discussion of the Incident Investigation Team program and summarize the Incident Investigation Team and Augmented Inspection Team reports for that group of licensees. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Each volume contains a list of the AEOD reports issued for 1984--1992.

  19. Knowledge Management Initiatives Used to Maintain Regulatory Expertise in Transportation and Storage of Radioactive Materials - 12177

    SciTech Connect (OSTI)

    Lindsay, Haile; Garcia-Santos, Norma; Saverot, Pierre; Day, Neil; Gambone Rodriguez, Kimberly; Cruz, Luis; Sotomayor-Rivera, Alexis; Vechioli, Lucieann; Vera, John; Pstrak, David

    2012-07-01

    The U.S. Nuclear Regulatory Commission (NRC) was established in 1974 with the mission to license and regulate the civilian use of nuclear materials for commercial, industrial, academic, and medical uses in order to protect public health and safety, and the environment, and promote the common defense and security. Currently, approximately half (?49%) of the workforce at the NRC has been with the Agency for less than six years. As part of the Agency's mission, the NRC has partial responsibility for the oversight of the transportation and storage of radioactive materials. The NRC has experienced a significant level of expertise leaving the Agency due to staff attrition. Factors that contribute to this attrition include retirement of the experienced nuclear workforce and mobility of staff within or outside the Agency. Several knowledge management (KM) initiatives have been implemented within the Agency, with one of them including the formation of a Division of Spent Fuel Storage and Transportation (SFST) KM team. The team, which was formed in the fall of 2008, facilitates capturing, transferring, and documenting regulatory knowledge for staff to effectively perform their safety oversight of transportation and storage of radioactive materials, regulated under Title 10 of the Code of Federal Regulations (10 CFR) Part 71 and Part 72. In terms of KM, the SFST goal is to share critical information among the staff to reduce the impact from staff's mobility and attrition. KM strategies in place to achieve this goal are: (1) development of communities of practice (CoP) (SFST Qualification Journal and the Packaging and Storing Radioactive Material) in the on-line NRC Knowledge Center (NKC); (2) implementation of a SFST seminar program where the seminars are recorded and placed in the Agency's repository, Agency-wide Documents Access and Management System (ADAMS); (3) meeting of technical discipline group programs to share knowledge within specialty areas; (4) development of written guidance to capture 'administrative and technical' knowledge (e.g., office instructions (OIs), generic communications (e.g., bulletins, generic letters, regulatory issue summary), standard review plans (SRPs), interim staff guidance (ISGs)); (5) use of mentoring strategies for experienced staff to train new staff members; (6) use of Microsoft SharePoint portals in capturing, transferring, and documenting knowledge for staff across the Division from Division management and administrative assistants to the project managers, inspectors, and technical reviewers; and (7) development and implementation of a Division KM Plan. A discussion and description of the successes and challenges of implementing these KM strategies at the NRC/SFST will be provided. (authors)

  20. Regulatory Considerations for Developing Generation Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Generation Projects on Federal Lands Regulatory Considerations for Developing Generation Projects on Federal Lands Presentation covers regulatory considerations for developing...

  1. Regulatory Considerations for Developing Distributed Generation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Considerations for Developing Distributed Generation Projects Webinar May 23, 2012 Regulatory Considerations for Developing Distributed Generation Projects Webinar May...

  2. Responsible University Officer Chief Information Officer

    E-Print Network [OSTI]

    Whitton, Mary C.

    Responsible University Officer Chief Information Officer Responsible Office Information Technology Services Information Security Liaison Policy Policy Statement Given the risks associated with information and Department Heads be aware of information security issues and of their responsibilities for mitigating

  3. California Energy Commission STAFF FINAL REPORT

    E-Print Network [OSTI]

    Solar Homes Partnership, Program Administration, and Program Benefits Assessment, with general comments in participating in funding opportunities provided by the EPIC program. The Energy Commission plans to begin offering opportunities for funding through EPIC after July 2013. The Energy Commission plans to utilize

  4. California Energy Commission DRAFT STAFF REPORT

    E-Print Network [OSTI]

    . Steven Mac and Irene Salazar provided the historic consumption data. Mark Ciminelli provided a newCalifornia Energy Commission DRAFT STAFF REPORT UPDATED CALIFORNIA ENERGY DEMAND FORECAST 20112022 MAY 2011 CEC2002011006SD #12;CALIFORNIA ENERGY COMMISSION Chris Kavalec Principal Author Chris

  5. Office of Chief Financial Officer

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-11-27

    Page Change 1 to DOE O 520.1 modifies the responsibility statement to include NNSA Field CFO positions, modifies Heads of Field Elements responsibilities for consistency with the CFO responsibilities, and makes a minor change to reflect the establishment of the Office of Management, Budget and Evaluation. Cancels SEN 34-9.

  6. Harrods commissions new CHP station

    SciTech Connect (OSTI)

    Mullins, P.

    1994-04-01

    Three new combined heat and power (CHP) sets have recently been commissioned at Harrods, the world-famous department store in the heart of London's fashionable Knightsbridge district. The sets provide all the electricity needed by the store for lighting, heating and air-conditioning and are powered by Ruston 6RK270 turbocharged, charge-air-cooled diesel engines each producing 1392 kW at 750 r/min. These high power-to-weight ratio units were chosen in view of severe engine room space limitations. Low-grade waste heat is extracted from the engine jacket water to preheat water for three new boilers supplying some 1600 kg/h of steam for process heat to the store. The engines drive Brush BJS HW 10 100/8 alternators and are fully automatic in operation through a Regulateurs Europa control system. Some 600 sensors feed data into a Satchwell Building Management System (BMS). In the event of a breakdown, the engine control system can be switched to manual. 5 figs.

  7. Automated Commissioning for Lower-cost, Widely Deployed Building Commissioning of the Future

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas

    2011-08-16

    This chapter takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that is performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. This chapter then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

  8. DOE - Office of Legacy Management -- Rocky Flats Regulatory Documents

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and700, 1.Reports FernaldNew

  9. Instrumented home energy rating and commissioning

    SciTech Connect (OSTI)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-05-01

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify deficiencies or to correct them. Solving this problem requires field performance evaluations using appropriate and agreed upon procedures in the form of a new process called residential commissioning. The purpose of this project is to develop and document these procedures and to demonstrate the value that applying them could provide in both new and existing California houses. This project has four specific objectives: to develop metrics and diagnostics for assessing house performance, to provide information on the potential benefits of commissioning using a whole-house approach, to develop programmatic guidelines for commissioning, and to conduct outreach efforts to transfer project results to industry stakeholders. The primary outcomes from this project are the development of residential commissioning guidelines and the analytical confirmation that there are significant potential benefits associated with commissioning California houses, particularly existing ones. In addition, we have made substantial advances in understanding the accuracy and usability of diagnostics for commissioning houses. In some cases, we have been able to work with equipment manufacturers to improve these aspects of their diagnostic tools. These outcomes provide a solid foundation on which to build a residential commissioning program in California. We expect that a concerted effort will be necessary to integrate such a program with existing building industry efforts and to demonstrate its use in the field.

  10. Responsible University Officer Chief Information Officer

    E-Print Network [OSTI]

    Whitton, Mary C.

    Responsible University Officer Chief Information Officer Responsible Office Information Technology at Chapel Hill that manages its own or subcontracts its information technology must: Establish and maintain Management Plan, contact the Information Security Office (ISO) at 919-445-9393 or security@unc.edu. Designate

  11. OFFICE of the CHIEF INFORMATION SECURITY OFFICER

    E-Print Network [OSTI]

    Matrajt, Graciela

    OFFICE of the CHIEF INFORMATION SECURITY OFFICER 2013 Information Security and Privacy Annual conversation,The Office of the Chief Information Security Officer (CISO) invites readers to email ciso@uw.edu by May 1st, 2014 with privacy-themed cap- tions for the cartoon on the right.Winning captions

  12. Activities of Building Commissioning in Japan 

    E-Print Network [OSTI]

    Yanagihara, R.

    2006-01-01

    and BackgroundIntroduction and Background #0;?#0;?#0;?#0;? Activities of Building CActivities of Building C??in Japanin Japan ?? IBEC Activity for IEA/Annex40,47IBEC Activity for IEA/Annex40,47 ?? SHASE Activity for Commissioning GuidelineSHASE Activity... ??TepcoTepcoTachikawaTachikawaBuildingBuilding ??Yamatake Research CenterYamatake Research Center ??Red Cross Medical Center Red Cross Medical Center Commissioning Map, Japan and WorldCommissioning Map, Japan and World SHASE BEMS Committee...

  13. Buildings, Commissioning, Efficiency, Comfort, and CO2 

    E-Print Network [OSTI]

    Claridge, D. E.

    2006-01-01

    .6% of world CO2 emissions)? US commercial sector use ~50% of world commercial use? Asia today 10-20% of world commercial use 2055200514 7 Billion of Tons of Carbon Emitted per Year 1955 0 C Flat path Historicalemissions 1.9 ?Æ?Æ 2105 14 GtC/y7 GtC/y Seven..., Commissioning, Efficiency, Comfort, and CO2 Asian Pacific Building Commissioning Conference ICEBONovember 8, 2006Shenzhen, ChinaPresented ByDavid E. ClaridgeEnergy Systems LaboratoryTexas A&M University Commissioning New Buildings Beginnings Building Handover...

  14. Regulatory Analysis on Criteria

    Office of Scientific and Technical Information (OSTI)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield MunicipalTechnical Report:Speeding accessby aLEDSpeeding FINAL Progress ReportEnergy,Regulatory

  15. Environmental Regulatory Framework

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would like submitKansasCommunitiesof Energy Services » ProgramEnvironmentalPolicyRegulatory

  16. Japanese Vision of Commissioning Process and Asian View 

    E-Print Network [OSTI]

    Nakahara, N.

    2004-01-01

    Building Services Commissioning Association, BSCA, has been established in Japan as an NPO in order to propagate the building commissioning, especially HVAC commissioning, process among building and building services ...

  17. ORNL/TM-2005/553 The Effect of Elevated Temperature on

    E-Print Network [OSTI]

    Pennycook, Steve

    .4) Prepared for the U.S. Nuclear Regulatory Commission Office of Nuclear Regulatory Research Under Interagency for the U.S. Nuclear Regulatory Commission Office of Nuclear Regulatory Research Under Interagency Agreement materials for elevated- temperature service is presented. Nuclear power plant and general civil engineering

  18. Director's Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HAB PacketDiesel pricesCenter at CornellDirector's Office Print

  19. Office Buildings

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home PageMonthly","10/2015"4,"Ames5 Tables July 1996 Energy Information Administration Office of Coal, Nuclear,DecadeYear Jan FebElements)Feet) Decade8 45YearYear

  20. Using Building Control System for Commissioning 

    E-Print Network [OSTI]

    Vaezi-Nejad, H.; Salsbury, T.; Choiniere, D.

    2004-01-01

    This paper summarizes the different approaches developed during Annex 40 (research project of International Energy Agency - Energy Conservation in Buildings & Community Systems ) for carrying out commissioning activities using the control system...

  1. California Energy Commission Systems Assessment & Facilities Division

    E-Print Network [OSTI]

    North Atlantic Ocean South Atlantic Ocean North Pacific Ocean South Pacific Ocean Arctic Ocean North Pacific Ocean Indian Ocean NORTH AMERICA SOUTH AMERICA AFRICA EUROPE ASIA AUSTRAILA RUSSIA ANTARCTICA GREENLAND CENTRAL AMERICA MIDDLE EAST Southern Ocean California Energy Commission Systems

  2. California Energy Commission COMMITTEE DRAFT REPORT

    E-Print Network [OSTI]

    . Alternative and renewable transportation fuels include electricity, natural gas, biomethane, propane ­ California Air Resources Board Tim Carmichael ­ California Natural Gas Vehicle Coalition Brooke Coleman ENERGY COMMISSION TRANSPORTATION COMMITTEE James D. Boyd Vice-Chair Presiding Member Carla Peterman

  3. Utah Commission on Aging June 6, 2007

    E-Print Network [OSTI]

    Tipple, Brett

    Institutions Norma Matheson Chair Anne Peterson University of Utah Mayor JoAnn Seghini Midvale City Sara to the Commission for consideration. · Aging SMART: Denise Brooks distributed Aging SMART Sourcebook. Website is up

  4. Control System Commissioning for Enhanced Building Operations 

    E-Print Network [OSTI]

    Salsbury, T. I.; Singhal, A.

    2003-01-01

    This paper highlights the import role control systems play in the operation of modern buildings and describes ways to improve the final stage of commissioning. We also describe practical issues associated with modern IT-oriented control systems...

  5. Potential Benefits of Commissioning California Homes

    E-Print Network [OSTI]

    Matson, Nance; Wray, Craig; Walker, Iain; Sherman, Max

    2002-01-01

    California houses are improved energy utilization and reduced operating costs.Costs = Increased Funds for Other Purposes Improving the energy efficiency of California’costs, and environmental impacts. Energy Consumption Our evaluation of the benefits from commissioning California’

  6. Delaware River Basin Commission (Multiple States)

    Broader source: Energy.gov [DOE]

    The Delaware River Basin Commission (DRBC) is a federal-interstate compact government agency that was formed by concurrent legislation enacted in 1961 by the United States and the four basin states...

  7. Canada-United States Regulatory Cooperation Council Webinar:...

    Office of Environmental Management (EM)

    REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT REGULATORY PARTNERSHIP STATEMENT REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT: Natural Gas Use in Transportation...

  8. Vision of a Visualization Tool for Commissioning 

    E-Print Network [OSTI]

    Isakson, P.; Eriksson, J.

    2004-01-01

    VISUALIZATION TOOL FOR COMMISSIONING Per Isakson*, Jörgen Eriksson** * Building Sciences KTH, Stockholm SWEDEN. per.isakson@byv.kth.se ** ÅF-Installation, Göteborg, SWEDEN. jorgen.eriksson@af.se Summary. A prototype visualisation tool to display... commissioning and not the least proper operation and maintenance. Energy savings in the order of 5% to 15% may typically be realized by means of improved operation alone. This is already recognized by the industry, but several obstacles hamper a performance...

  9. Atomic Energy Commission Explores Peaceful Uses of Nuclear Explosions...

    National Nuclear Security Administration (NNSA)

    Our Jobs Working at NNSA Blog Home About Us Our History NNSA Timeline Atomic Energy Commission Explores Peaceful Uses of ... Atomic Energy Commission Explores Peaceful...

  10. Hawaii Department of Land and Natural Resources Commission on...

    Open Energy Info (EERE)

    Hawaii Department of Land and Natural Resources Commission on Water Resource Management Jump to: navigation, search Name: Hawaii Department of Land and Natural Resources Commission...

  11. Retro-Commissioning for State and Local Governments

    SciTech Connect (OSTI)

    Existing Commercial Buildings Working Group

    2012-05-23

    Describes how state and local governments can lead by example by retro-commissioning their own buildings and adopting retro-commissioning policies for the private sector.

  12. Commission to Review the Effectiveness of the National Energy...

    Energy Savers [EERE]

    Commission to Review the Effectiveness of the National Energy Laboratories, March 24, 2015 Commission to Review the Effectiveness of the National Energy Laboratories, March 24,...

  13. Ex Parte Meeting between DOE and California Energy Commission...

    Broader source: Energy.gov (indexed) [DOE]

    The California Energy Commission (Energy Commission) expressed concern about the differences in the stringency of California standards and the proposed DOE standards. The Energy...

  14. Task Force for Strategic Developments to Blue Ribbon Commission...

    Office of Environmental Management (EM)

    Task Force for Strategic Developments to Blue Ribbon Commission Recommendations Task Force for Strategic Developments to Blue Ribbon Commission Recommendations Formed at the...

  15. Design and Commissioning of a Wind Tunnel for Integrated Physical...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commissioning of a Wind Tunnel for Integrated Physical and Chemical Measurements of PM Dispersing Plume of Heavy Duty Diesel Truck Design and Commissioning of a Wind Tunnel for...

  16. Office for Analysis and Evaluation of Operational Data. Annual report, 1994-FY 95

    SciTech Connect (OSTI)

    1996-07-01

    The United States Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) has published reports of its activities since 1984. The first report covered January through June of 1984, and the second report covered July through December 1984. Since those first two semiannual reports, AEOD has published annual reports of its activities from 1985 through 1993. Beginning with the report for 1986, AEOD Annual Reports have been published as NUREG-1272. Beginning with the report for 1987, NUREG-1272 has been published in two parts, No. 1 covering power reactors and No. 2 covering nonreactors (changed to {open_quotes}nuclear materials{close_quotes} with the 1993 report). The 1993 AEOD Annual Report was NUREG-1272, Volume 8. AEOD has changed its annual report from a calendar year to a fiscal year report to be consistent with the NRC Annual Report and to conserve staff resources. NUREG-1272, Volume 9, No. 1 and No. 2, therefore, are combined calendar year 1994 (1994) and fiscal year 1995 (FY 95) reports which describe activities conducted between January 1, 1994, and September 30, 1995. Certain data which have historically been reported on a calendar year basis, however, are complete through calendar year 1995. Throughout this report, whenever information is presented for fiscal year 1995, it is designated as FY 95 data. Calendar year information is always designated by the four digits of the calendar year. This report, NUREG-1272, Volume 9, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective. NUREG-1272, Vol. 9, No. 2, covers nuclear materials and presents a review of the events and concerns associated with the use of licensed material in non-power reactor applications. A new part has been added, NUREG-1272, Volume 9, No. 3, which covers technical training and presents the activities of the Technical Training Center in FY 95 in support of the NRC`s mission.

  17. Office of Communication - Speakers' Bureau

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Office of Communication Office of Communication home | Office of Communication staff | speakers' bureau | available materials | links | talk to Fermilab Speakers' Bureau The Office...

  18. UNITED STATES OF AMERICA 115 FERC 61,230 FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    System Operator Corporation and the California Power Exchange Puget Sound Energy, Inc. v. All arising from events in the California Independent System Operator (CAISO) and California Power Exchange

  19. UNITED STATES OF AMERICA105 FERC 61,307 FEDERAL ENERGY REGULATORY COMMISSION

    E-Print Network [OSTI]

    Laughlin, Robert B.

    segments of the industry, including investor-owned utilities, independent power producers Protocols ("MMIP") contained in the tariffs of the California Independent System Operator Corporation ("CAISO") and the California Power Exchange Corporation ("PX") put participants in the CAISO and PX

  20. Federal Energy Regulatory Commission financial statements, September 30, 1994 and 1993

    SciTech Connect (OSTI)

    Marwick, P.

    1994-12-31

    Oversee America`s natural gas and oil pipeline transportation systems, electric utilities, and hydroelectric projects; and ensure that Americans have an abundant supply of natural gas and electricity at just and reasonable rates.

  1. The United States Nuclear Regulatory Commission and the United States Department Of Energy Public Meeting

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann Jackson About1996HowFOAShowing YouNeed for EssentialAnchorage, Alaska,Reno,Savings for1 2

  2. Management Letter on the Federal Energy Regulatory Commission's Fiscal Year 2014 Financial Statement Audit

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLforLDRDEnergyTurbineProcessesEnergyofEnergyThe 2020 OAS-FS-14-06

  3. File:Federal Hydropower - Federal Energy Regulatory Commission.pdf | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButtePowerEdisto ElectricMonasterwind crossword.pdf Jump to:DODEnergy

  4. Audit of the Federal Energy Regulatory Commission Leased Warehouse Space, CR-B-96-01

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i p a l De p uBUS SERVICE SUBSIDIES AT THE IDAHO1997 AUDIT OF THE FEDERAL

  5. US Nuclear Regulatory Commission Input to DOE Request for Information Smart

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyThe U.S.Laclede GasEfficiency|Feed| DepartmentOFAdvancedGrid Implementation Input |

  6. AUDIT REPORT Federal Energy Regulatory Commission's Fiscal Year 2015 Financial Statement Audit

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i p a l De p u t y A s sconveyance of9, 2013ATVMEnergy's FiscalFiscal Year

  7. Federal Energy Regulatory Commission Interconnection Queue Practices Technical Conference December 11, 2007

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015Executive Order14, 20111,FYDepartment of5!National Electric Transmission

  8. Report to Congress:Impacts of the Federal Energy Regulatory Commission's

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterestedReplacement-2-A Wholesale Power Rate ScheduleSHERMAN STREET,andReport

  9. The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2011, OAS-M-12-01

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsState of Pennsylvania U.S. DepartmentTheReport1Evaluation

  10. The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2012, OAS-L-13-01

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsState of Pennsylvania U.S. DepartmentTheReport1Evaluation2

  11. The Federal Energy Regulatory Commission's Unclassified Cyber Security Program Â… 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsState of Pennsylvania U.S.

  12. Techniques of analyzing the impacts of certain electric-utility ratemaking and regulatory-policy concepts. Bibliography

    SciTech Connect (OSTI)

    1980-08-01

    This bibliography provides documentation for use by state public utility commissions and major nonregulated utilities in evaluating the applicability of a wide range of electric utility rate design and regulatory concepts in light of certain regulatory objectives. Part I, Utility Regulatory Objectives, contains 2084 citations on conservation of energy and capital; efficient use of facilities and resources; and equitable rates to electricity consumers. Part II, Rate Design Concepts, contains 1238 citations on time-of-day rates; seasonally-varying rates; cost-of-service rates; interruptible rates (including the accompanying use of load management techniques); declining block rates; and lifeline rates. Part III, Regulatory Concepts, contains 1282 references on restrictions on master metering; procedures for review of automatic adjustment clauses; prohibitions of rate or regulatory discrimination against solar, wind, or other small energy systems; treatment of advertising expenses; and procedures to protect ratepayers from abrupt termination of service.

  13. Office for Analysis and Evaluation of Operational Data 1990 annual report

    SciTech Connect (OSTI)

    1991-07-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1990. The report is published in two separate parts. This document NUREG-1272, Vol. 5, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC's Operations Center. NUREG-1272, Vol.5, No. 2, covers nonreactors and presents a review of the events and concerns during 1990 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. The reports contain a discussion of the Incident Investigation Team program and summarize the Incident Investigation Team and Augmented Inspection Team reports for that group of licensees. Each volume contains a list of the AEOD reports issued for 1980 through 1990. 9 figs., 8 tabs.

  14. Finance & Administration Controller's Office

    E-Print Network [OSTI]

    Weston, Ken

    Finance & Administration Controller's Office April 2014 Michael Williams Controller Controller ICOFA 61318 Revised: 4/4/2014 #12;Finance & Administration Controller's Office Accounting & Asset Coordinator Property Surplus Sales 81269 Revised: 4/4/2014 #12;Finance & Administration Controller's Office

  15. Nuclear Safety Regulatory Framework

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties -DepartmentAvailable forSite |n t e OfficeResearchDepartment of Energy

  16. Regulatory and technical reports (abstract index journal): Annual compilation for 1994. Volume 19, Number 4

    SciTech Connect (OSTI)

    1995-03-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC`s intention to publish this compilation quarterly and to cumulate it annually. The main citations and abstracts in this compilation are listed in NUREG number order. These precede the following indexes: secondary report number index, personal author index, subject index, NRC originating organization index (staff reports), NRC originating organization index (international agreements), NRC contract sponsor index (contractor reports), contractor index, international organization index, and licensed facility index. A detailed explanation of the entries precedes each index.

  17. Confidential data in a competitive utility environment: A regulatory perspective

    SciTech Connect (OSTI)

    Vine, E.

    1996-08-01

    Historically, the electric utility industry has been regarded as one of the most open industries in the United States in sharing information but their reputation is being challenged by competitive energy providers, the general public, regulators, and other stakeholders. As the prospect of competition among electricity power providers has increased in recent years, many utilities have been requesting that the data they submit to their utility regulatory commissions remain confidential. Withholding utility information from the public is likely to have serious and significant policy implications with respect to: (1) consumer education, the pursuit of truth, mutual respect among parties, and social cooperation; (2) the creation of a fair market for competitive energy services; (3) the regulatory balance; (4) regional and national assessments of energy-savings opportunities; (5) research and development; and (6) evaluations of utility programs, plans, and policies. In a telephone survey of all public utility commissions (PUCs) that regulate electric and gas utilities in the U.S., we found that almost all PUCs have received requests from utility companies for data to be filed as confidential, and confidential data filings appear to have increased (both in scope and in frequency) in those states where utility restructuring is being actively discussed. The most common types of data submitted as confidential by utilities dealt with specific customer data, market data, avoided costs, and utility costs.

  18. Commissioning in a LEED & GOBAS Evaluated Green Building 

    E-Print Network [OSTI]

    Zhang, Y.

    2006-01-01

    scheme ???????? ?????????????? ???????? Special interests Special interests ??energy audit and assessmentenergy audit and assessment Commissioning in an Evaluated Green BuildingCommissioning in an Evaluated Green Building 99 ???? Method....620.20.487.2811.5463.1 Commissioning in an Evaluated Green BuildingCommissioning in an Evaluated Green Building 1717 ?????????????????????? Enthalpy Wheel for Heat RecoveryEnthalpy Wheel for Heat Recovery ???????? ???????????????????? ???????? Well designed, imported from Sweden...

  19. Building Technologies Office Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Roland Risser Director, Building Technologies Office Building Technologies Office Overview Our Homes and Buildings Use 40% of Our Nation's Energy and 75% of Electricity Energy Use...

  20. Building Technologies Office Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technologies Office Roland Risser Director, Building Technologies Office National Energy Consumption 40% 60% Reducing consumption or improving performance calls for cutting-edge...

  1. Regulatory Considerations for Developing Distributed Generation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Distributed Generation Projects Webinar May 23, 2012 Regulatory Considerations for Developing Distributed Generation Projects Webinar May 23, 2012 Document covers the Regulatory...

  2. Notice of Decision by the California Energy Commission To: California Resources Agency From: California Energy Commission

    E-Print Network [OSTI]

    Notice of Decision by the California Energy Commission To: California Resources Agency From: California Energy Commission 1416 9th Street, Room 1311 1516 9th Street MS-2000 Sacramento, CA 95814 Sacramento, CA 95814 Subject: Filing of Notice of Decision in compliance with Public Resources Code Section

  3. NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission

    E-Print Network [OSTI]

    NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission 1416 9th Street, Room 1311 1516 9th Street, MS-2000 Sacramento, CA 95814 Sacramento, CA 95814 Subject: Filing of Notice of Decision in compliance with Public Resources Code Section

  4. LBNL -47412 Residential Commissioning to Assess

    E-Print Network [OSTI]

    Secretary for Energy Efficiency and Renewable Energy, Office of Building Technology, State and Community Programs, Office of Building Research and Standards, of the U.S. Department of Energy under contract no. DE Scientist and Group Leader at LBNL in its Energy Performance of Buildings Group. #12;i TABLE OF CONTENTS

  5. California Energy Commission DRAFT STAFF REPORT

    E-Print Network [OSTI]

    . The information relates to electricity demand forecasts, demand-side management and energy efficiency impacts Office Manager DEMAND ANALYSIS OFFICE Sylvia Bender Deputy Director ELECTRICITY SUPPLY ANALYSIS DIVISION-2012. Keywords: Electricity demand, consumption, forecast, peak, self-generation, conservation, demand-side

  6. Allowance trading activity and state regulatory rulings: Evidence from the US Acid Rain Program

    SciTech Connect (OSTI)

    Bailey, E.M.

    1997-12-31

    The US Acid Rain Program is one of the first, and by far the most extensive, applications of a market based approach to pollution control. From the beginning, there has been concern whether utilities would participate in allowance trading, and whether regulatory activity at the state level would further complicate utilities` decision to trade allowances. This paper finds that public utility commission regulation has encouraged allowance trading activity in states with regulatory rulings, but that allowance trading activity has not been limited to states issuing regulations. Until there is evidence suggesting that significant additional cost savings could have been obtained if additional allowance trading activity had occurred in states without regulations or that utilities in states with regulations are still not taking advantage of all cost saving trading opportunities, this analysis suggests that there is little reason to believe that allowance trading activity is impeded by public utility commission regulations.

  7. The Public Lands Commission of 1879 

    E-Print Network [OSTI]

    Odom, Danna Evelyn

    1971-01-01

    primary sources for a study of' the Public Lands Commission of i879 are the 2 1 ' rl ~Rt (46 Cong. , 2 . , Ron Rxee tt Document 06), and Thomas Donaldson's The Public Domain. Important background material for the formation of the commission... is provided. by A Letter from the ~Actin Presi- 6* t 8 th Nt' 1~Ad. f S ' ~7?'tt' sess. , House Miscellaneous Document 5), and by the ~Re ort on the Lands of the Arid ~Re ion of the United. States with a Kore Detailecl Account of the Lands of Utah, by John...

  8. Texas Facilities Commission's Facility Management Strategic Plan 

    E-Print Network [OSTI]

    Ramirez, J. A.

    2009-01-01

    stream_source_info ESL-IC-09-11-12.pdf.txt stream_content_type text/plain stream_size 4735 Content-Encoding ISO-8859-1 stream_name ESL-IC-09-11-12.pdf.txt Content-Type text/plain; charset=ISO-8859-1 Texas Facilities... Commission?s Facility Management Strategic Plan Jorge A. Ramirez Deputy Executive Director Building Operations & Plant Management ESL-IC-09-11-12 Proceedings of the Ninth International Conference for Enhanced Building Operations, Austin, Texas, November 17...

  9. Implications of the Public Utility Regulatory Act for Energy Efficiency in Texas 

    E-Print Network [OSTI]

    Biedrzycki, C. J.

    1985-01-01

    ? tion of economic electricity supply along with reliable service and just and reasonable services and rates for consumers. In the short-term, energy effi? ciency plan-ning should benefit both the utility and its customers by improv? ing the quality... Utility Commission of Texas (PUCT) establish a comprehensive regulatory system for electric, telephone, and water utilities. The rules which cover electric utilities contain provisions requiring certain electric utilities to prepare energy efficiency...

  10. Discovering Regulatory Overlapping RNA Transcripts

    E-Print Network [OSTI]

    Danford, Timothy William

    STEREO is a novel algorithm that discovers cis-regulatory RNA interactions by assembling complete and potentially overlapping same-strand RNA transcripts from tiling expression data. STEREO first identifies coherent segments ...

  11. Analysis of transcriptional regulatory circuitry

    E-Print Network [OSTI]

    Rinaldi, Nicola J., 1974-

    2004-01-01

    The research in this thesis has focused on the analysis of data from two types of microarray technologies with the goal of improving understanding of transcriptional regulatory circuitry in yeast. These microarray technologies, ...

  12. Advanced Manufacturing Office News

    SciTech Connect (OSTI)

    2013-08-08

    News stories about advanced manufacturing, events, and office accomplishments. Subscribe to receive updates.

  13. GUYANA FORESTRY COMMISSION NATIONAL WOOD TRACKING SYSTEM

    E-Print Network [OSTI]

    Timber Sales Agreement VPA Voluntary Partnership Agreement WCL Wood Cutting Lease WTS Wood Tracking chain is managed and controlled the Guyana Forestry Commission has developed a Wood Tracking System (WTS in the process as well as flow charts illustrating essential elements of the system. The WTS links closely

  14. The Research Agency of the Forestry Commission

    E-Print Network [OSTI]

    of the afforested peat resource in Wales, and the biodiversity, greenhouse gas flux and hydrological implications,038 ha of the afforested blanket bog and deep peat resource which are managed by Forestry Commission an improved distribution map of the upland blanket peat and deep peat soils resource at the highest resolution

  15. FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554

    E-Print Network [OSTI]

    Bove Jr., V. Michael

    FCC 96­207 Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554 In the Matter of a mechanism for a bit stream layer transmission standard (into which, e.g., MPEG­2 could fit) 3) The FCC: number of hours per day of digital television transmission, minimal Quality of Service specifications

  16. COMMISSION GUIDEBOOK NEW SOLAR HOMES PARTNERSHIP

    E-Print Network [OSTI]

    Partnership provides financial incentives for installing solar energy systems on new residential buildings for solar homes that incorporate high levels of energy efficiency and highperforming solar energy systems, Energy Commission, PV, solar energy system, energy efficiency, standards, Title 24 Part 6, tier

  17. Instrumented Home Energy Rating and Commissioning

    E-Print Network [OSTI]

    Secretary for Energy Efficiency and Renewable Energy, Building Technologies Program, of the U.S. DepartmentLBNL-52216 Instrumented Home Energy Rating and Commissioning Craig Wray, Iain Walker, Max Sherman Environmental Energy Technologies Division Indoor Environment Department Lawrence Berkeley National Laboratory

  18. TRANSIT COMMISSION MINUTES February 6, 2013

    E-Print Network [OSTI]

    with the engineering student who is working on his research project today to work out how he is doing his research. Ridership There was discussion about the overall trend of ridership shifting between routes, and upgrading the dispatch software. Finally, Sweeten informed the commission that he is implementing a new

  19. Regulatory Oversight Program, July 1, 1993--March 3, 1997. Volume 1

    SciTech Connect (OSTI)

    NONE

    1997-09-01

    On July 1, 1993, a Regulatory Oversight (RO) organization was established within the United States Department of Energy (DOE), Oak Ridge Operations (ORO) to provide regulatory oversight of the DOE uranium enrichment facilities leased to the United States Enrichment Corporation (USEC). The purpose of the RO program was to ensure continued plant safety, safeguards and security while the Paducah and Portsmouth gaseous diffusion plants (GDPs) transitioned to regulatory oversight by the Nuclear Regulatory Commission (NRC). These activities were performed under the authority of the lease agreement between DOE and USEC until NRC issued a Certificate of Compliance or approved a Compliance Plan pursuant to Section 1701 of the Atomic Energy Act of 1954, as amended, and assumed regulatory responsibility. This report chronicles the formal development, operation and key activities of the RO organization from its beginning in July 1993, until the turnover of the regulatory oversight responsibility to the NRC on March 3, 1997. Through its evolution to closure, the RO program was a formal, proceduralized effort designed to provide consistent regulation and to facilitate transition to NRC. The RO Program was also a first-of-a-kind program for DOE. The process, experience, and lessons learned summarized herein should be useful as a model for transition of other DOE facilities to privatization or external regulation.

  20. Commissioning to Meet Space Qualification Criteria vs. Energy Consumption Optimization Focused Commissioning 

    E-Print Network [OSTI]

    Sellers, D.; Irvine, L.

    2001-01-01

    In many cases, the commissioning process is driven by space quality criteria rather than by energy consumption and optimization criteria. This is especially true for the HVAC systems serving clean rooms in the semi-conductor and pharmaceuticals...

  1. An In-depth Analysis of Iron and Pathogenicity Regulatory Pathways in Pseudomonas syringae pv. syringae B728a 

    E-Print Network [OSTI]

    Greenwald, Jessica Williams

    2012-10-19

    -DEPTH ANALYSIS OF IRON AND PATHOGENICITY REGULATORY PATHWAYS IN Pseudomonas syringae pv. syringae B728A A Dissertation by JESSICA WILLIAMS GREENWALD Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment... of the requirements for the degree of DOCTOR OF PHILOSOPHY August 2011 Major Subject: Plant Pathology An In-Depth Analysis of Iron and Pathogenicity Regulatory Pathways in Pseudomonas...

  2. Current regulatory and licensing status for byproduct sources, facilities and applications

    SciTech Connect (OSTI)

    Tingey, G.L.; Jensen, G.A.; Hazelton, R.F.

    1985-02-01

    Public use of nuclear byproducts, especially radioactive isotopes, will require approval by various regulatory agencies. Use of cesium-137 as an irradiation source for sterilizing medical products will require US Nuclear Regulatory Commission (NRC) approval. Two applications have been filed with NRC, and approval is expected soon. Widespread use of irradiation for food products depends on a favorable ruling by the Food and Drug Administration (FDA). A ruling is pending that would permit irradiation of fruits and vegetables up to 100 krad. NRC also controls the use of isotopes in remote power generators, but little regulatory action has been required in recent years. Recent development of radioluminescent (RL) lighting for runway lights has led to interest by commercial manufacturers. At the present time, a license has been issued to at least one manufacturer for sale of tritium-powered runway lights. 28 refs., 1 fig.

  3. Commissioning, Operation, Real Time Monitoring and Evaluation of Pilot: Achieving Optimal Performance through Building Commissioning 

    E-Print Network [OSTI]

    Pang,X.; Piette, M.A.; Hao,B.

    2014-01-01

    CONSORTIUM U.S. - CHINA CLEAN ENERGY RESEARCH CENTER (CERC-BEE) E3: Commissioning, Operation, Real Time Monitoring and Evaluation of Pilot Achieving Optimal Performance through Building Commissioning Xiufeng Pang, Mary Ann Piette, Bin Hao Interface... to demo projects to ensure that the CERC-BEE demonstrated technologies work properly and are integrated with the rest of the building systems • Review the Cx plans for the two demo projects, the CABR building and the Xingye building. • Develop optimal...

  4. Oakland Operations Office, Oakland, California: Technology summary

    SciTech Connect (OSTI)

    Not Available

    1994-11-01

    DOE`s Office of Technology Development manages an aggressive national program for applied research, development, demonstration, testing, and evaluation. This program develops high, payoff technologies to clean up the inventory of DOE nuclear component manufacturing sites and to manage DOE-generated waste faster, safer, and cheaper than current environmental cleanup technologies. OTD programs are designed to make new, innovative, and more effective technologies available for transfer to users through progressive development. Projects are demonstrated, tested, and evaluated to produce solutions to current problems. Transition of technologies into more advanced stages of development is based upon technological, regulatory, economic, and institutional criteria. New technologies are made available for use in eliminating radioactive, hazardous, and other wastes in compliance with regulatory mandates. The primary goal is to protect human health and prevent further contamination. OTD technologies address three specific problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention.

  5. The Office of Independent Enterprise Assessments' Office of Enforcemen...

    Office of Environmental Management (EM)

    The Office of Independent Enterprise Assessments' Office of Enforcement convened the 2014 DOE Safety and Security Enforcement Workshop May 13 and 14, 2014 The Office of Independent...

  6. Office of Personnel Management (OPM) Billing System PIA, Office...

    Energy Savers [EERE]

    Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security Office of Personnel Management (OPM) Billing System PIA, Office of Health, Safety and Security...

  7. Curriculum for Commissioning Energy Efficient Buildings

    SciTech Connect (OSTI)

    Webster, Lia

    2012-09-30

    In July 2010, the U.S. Department of Energy (DOE) awarded funding to PECI to develop training curriculum in commercial energy auditing and building commissioning. This program was created in response to the high demand for auditing and commissioning services in the U.S. commercial buildings market and to bridge gaps and barriers in existing training programs. Obstacles addressed included: lack of focus on entry level candidates; prohibitive cost and time required for training; lack of hands-on training; trainings that focus on certifications & process overviews; and lack of comprehensive training. PECI organized several other industry players to create a co-funded project sponsored by DOE, PECI, New York State Energy and Research Development Authority (NYSERDA), California Energy Commission (CEC), Northwest Energy Efficiency Alliance (NEEA) and California Commissioning Collaborative (CCC). After awarded, PECI teamed with another DOE awardee, New Jersey Institute of Technology (NJIT), to work collaboratively to create one comprehensive program featuring two training tracks. NJIT’s Center for Building Knowledge is a research and training institute affiliated with the College of Architecture and Design, and provided e-learning and video enhancements. This project designed and developed two training programs with a comprehensive, energy-focused curriculum to prepare new entrants to become energy auditors or commissioning authorities (CxAs). The following are the key elements of the developed trainings, which is depicted graphically in Figure 1: • Online classes are self-paced, and can be completed anywhere, any time • Commissioning Authority track includes 3 online modules made up of 24 courses delivered in 104 individual lessons, followed by a 40 hour hands-on lab. Total time required is between 75 and 100 hours, depending on the pace of the independent learner. • Energy Auditor track includes 3 online modules made up of 18 courses delivered in 72 individual lessons, followed by a 24 hour hands-on lab. Total time required is between 50 and 70 hours, depending on the pace of the independent learner. • Individual courses can be taken for continuing education credits. • Assessments are included for each course, and a score of at least 80% is required for completion. • Completion of Modules 1 through 3 is prerequisite for participating in the laboratory. More experienced participants have the option to test out of Modules 1 and 2 and complete Module 3 to progress to the laboratory.

  8. A History of the Atomic Energy Commission

    SciTech Connect (OSTI)

    Buck, A.L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations.

  9. Ethylene plant commissioned at Corpus Christi

    SciTech Connect (OSTI)

    Not Available

    1984-01-01

    Ethylene Plant Commissioned at Corpus Christi. Corpus Christi Petrochemical Co. has commissioned its $600 million ethylene plant at Corpus Christi, Tex. Plant capacities include 1.2 billion lb/yr of ethylene, 560 million lb/yr of propylene, 400 million lb/yr of crude butadiene mixture, 60 million gal of benzene, 45 million gal of gasoline blending components, and 50 million gal of fuel oils. The ethylene and propylene will be transported by pipeline to Houston for further processing. At the Corpus Christi facilities, process pressures range from full vacuum to 1800 psig, and process temperatures range from -260/sup 0/ to +1600/sup 0/F. The plant uses gas oil and naphtha as feedstock, but also has some flexibility to use ethane or LPG as feedstock. Stone and Webster Engineering Corp. engineered and Brown and Root Inc. built the plant.

  10. The IEA/ECBCS/Annex 40 Glossary on Commissioning 

    E-Print Network [OSTI]

    Akashi, Y.; Castro, N.; Novakovic, V.; Viaud, B.; Jandon, M.

    2004-01-01

    International Energy Agency's (IEA) Energy Conservation in Building and Community Systems' (ECBCS) Annex 40 has developed a glossary of commissioning terms as one of the first commissioning tools produced within the annex. The glossary consists...

  11. Ontology Development for Low-Energy Building Embedded Commissioning 

    E-Print Network [OSTI]

    Lee, K. J.; Akin, O.; Akinci, B.; Garrett, J.; Bushby, S.

    2009-01-01

    building commissioning process models, we found that there is a need to categorize and classify information items, which are available in commissioning process descriptions. In addition, the relationship between these items should be clearly defined...

  12. Roanoke River Basin Bi-State Commission (Multiple States)

    Broader source: Energy.gov [DOE]

    The Roanoke River Basin Bi-State Commission was established as a bi-state commission composed of members from the Commonwealth of Virginia and the State of North Carolina. The purpose of the...

  13. COMMISSIONING OF THE RELATIVISTIC HEAVY ION COLLIDER.

    SciTech Connect (OSTI)

    TRBOJEVIC,D.; AHRENS,L.; BLASKIEWICZ,M.; BRENNAN,M.; BAI,M.; CAMERON,P.; CARDONA,J.; CONNOLLY,R.; ET AL; TSOUPAS,N.; VAN ZEIJTS,J.

    2001-06-18

    This report describes in detail steps performed in bringing the Relativistic Heavy Ion Collider (RHIC) from the commissioning into the operational stage when collisions between 60 bunches of fully striped gold ions, were routinely provided. Corrections of the few power supplies connections by the beam measurements are described. Beam lifetime improvements at injection, along the acceleration are shown. The beam diagnostic results; like Schottky detector, beam profile monitor, beam position monitors, tune meter and others, are shown [1].

  14. CALIFORNIA ENERGY COMMISSION NEW CONSTRUCTION ENERGY AUDITS

    E-Print Network [OSTI]

    RENOVATION CALIFORNIA ENERGY COMMISSION NEW CONSTRUCTION ENERGY AUDITS F O R T E C H N I C A L A S S I S TA N C E ENERGY EFFICIENCY All public or non-profit K­12 schools are eligible for assistance www.energy.ca.gov/efficiency/brightschools Call: (916) 654-4147 LOWER ENERGY COSTS AND IMPROVED LEARNING ENVIRONMENTS = Publication No. P400

  15. December 15, 2014 LAB COMMISSION MEETING MINUTES

    Broader source: Energy.gov [DOE]

    The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its fifth meeting at 10:00 AM on December 15, 2014. Commission Co-Chair Jared Cohon led the meeting. The meeting included two panels: (1) authors of recent reports about the DOE National Labs and (2) a national lab contractor panel. The report authors summarized their respective reports, highlighting concerns related to the relationship between DOE and the labs, research funding and strategy stove-piping, weak links between the labs and market, an inconsistent economic development mission, the difficulty small firms have in accessing labs, the labs’ lack of regional engagement, and DOE and congressional micromanagement of the labs. The lab contractor representatives responded to questions posed by the commissioners related to lab management and the relationship with DOE. Additionally, Patricia Falcone spoke of the important role of the labs in the science and technology enterprise and Alan Leshner talked about the labs and their relationship with the scientific community. Christopher Paine presented his views on transforming the weapons complex. The next meeting will be held February 24 at the Hilton at Mark Center in VA.

  16. The Commission Forecast 1992 Report: Important Resource Planning Issues 

    E-Print Network [OSTI]

    Adib, P.

    1992-01-01

    FORECAST 1992 REPORT: IMPORTANT RESOURCE PLANNING ISSUES PARVIZ ADIB MANAGER, ECONOMIC ANALYSIS SECTION ELECTRIC DIVISION PUBLIC UTILITY COMMISSION OF TEXAS ABSTRACT There is a general agreement among experts in the electric utility industry... there are many important issues in the preparation of a utility's electric resource plan, the Commission staff will address a few important ones in the next Commission Forecast Report (Forecast '92). In particular, the Commission staff will insure...

  17. Atomic Energy Commission : Atomic Power at Shippingport - 1958 Educational Film

    SciTech Connect (OSTI)

    2013-02-02

    The United States Atomic Energy Commission & Westinghouse Electric Company take us on a tour of an atomic power station.

  18. Emergency preparedness source term development for the Office of Nuclear Material Safety and Safeguards-Licensed Facilities

    SciTech Connect (OSTI)

    Sutter, S.L.; Mishima, J.; Ballinger, M.Y.; Lindsey, C.G.

    1984-08-01

    In order to establish requirements for emergency preparedness plans at facilities licensed by the Office of Nuclear Materials Safety and Safeguards, the Nuclear Regulatory Commission (NRC) needs to develop source terms (the amount of material made airborne) in accidents. These source terms are used to estimate the potential public doses from the events, which, in turn, will be used to judge whether emergency preparedness plans are needed for a particular type of facility. Pacific Northwest Laboratory is providing the NRC with source terms by developing several accident scenarios for eleven types of fuel cycle and by-product operations. Several scenarios are developed for each operation, leading to the identification of the maximum release considered for emergency preparedness planning (MREPP) scenario. The MREPP scenarios postulated were of three types: fire, tornado, and criticality. Fire was significant at oxide fuel fabrication, UF/sub 6/ production, radiopharmaceutical manufacturing, radiopharmacy, sealed source manufacturing, waste warehousing, and university research and development facilities. Tornadoes were MREPP events for uranium mills and plutonium contaminated facilities, and criticalities were significant at nonoxide fuel fabrication and nuclear research and development facilities. Techniques for adjusting the MREPP release to different facilities are also described.

  19. California Energy Commission Technical Assistance for the Alternative and

    E-Print Network [OSTI]

    California Energy Commission 1 Technical Assistance for the Alternative and Renewable Fuel and Vehicle Technology (ARFVT) Program California Energy Commission Request for Proposals RFP # 600-12-604 Pre-Bid Conference Date: January 23, 2013 #12;California Energy Commission AGENDA 10:00 Welcome and Introductions

  20. California Energy Commission Alternative and Renewable Fuel and Vehicle Technology

    E-Print Network [OSTI]

    California Energy Commission Alternative and Renewable Fuel and Vehicle Technology Program Advisory, Statutes of 2007) created the Alternative and Renewable Fuel and Vehicle Technology Program (hereinafter "Program") to be administered by the California Energy Commission (Energy Commission).1 AB 118 authorizes

  1. Page 1 of 3 South Carolina Commission on Higher Education

    E-Print Network [OSTI]

    Kunkle, Tom

    Page 1 of 3 South Carolina Commission on Higher Education Nonpublic Postsecondary Institution the South Carolina Commission on Higher Education. The school director will provide the students with the necessary form. #12;Page 3 of 3 South Carolina Commission on Higher Education Nonpublic Postsecondary

  2. Commissioner Catherine J.K. Sandoval California Public Utilities Commission

    E-Print Network [OSTI]

    Stoltz, Brian M.

    Commissioner Catherine J.K. Sandoval California Public Utilities Commission Caltech April 2, 2014 by Constitutional Amendment as the Railroad Commission. · In 1912, the Legislature passed the Public Utilities Act Utilities Commission. · CPUC regulates Investor-Owned Utilities that provide: ­ Electricity ­ Gas

  3. Office of Information Management

    Broader source: Energy.gov [DOE]

    The Office of Information Management provides a broad range of information technology services in support of the Associate Under Secretary for the Office of Environment, Health, Safety and Security (AU).

  4. Office Buildings: Consumption Tables

    U.S. Energy Information Administration (EIA) Indexed Site

    and Type of Office Building Total (trillion Btu) per Building (million Btu) per Square Foot (thousand Btu) Dollars per Million Btu All Office Buildings 1,089 1,475 90.5 16.32...

  5. Finance & Administration Controller's Office

    E-Print Network [OSTI]

    McQuade, D. Tyler

    Finance & Administration Controller's Office July 2014 Michael Williams Controller Controller Administrative Services 51111 Catherine Hebert Program Director ICOFA 61318 Revised: 7/28/2014 #12;Finance Surplus Property 81269 Revised: 7/28/2014 #12;Finance & Administration Controller's Office Disbursement

  6. Office Buildings - Full Report

    Gasoline and Diesel Fuel Update (EIA)

    PDF Office Buildings Although no one building type dominates the commercial buildings sector, office buildings are the most common and account for more than 800,000 buildings or 17...

  7. Student Services Conference Office

    E-Print Network [OSTI]

    Sussex, University of

    Student Services Conference Office Guidelines VAT Exemption for Eligible Bodies #12;Student ........................................................................................................2 Applying the rules to Conferences is intended for use by the University of Sussex Conference Office to determine if an Organisation using

  8. Finance & Administration Controller's Office

    E-Print Network [OSTI]

    Finance & Administration Controller's Office July 2015 Michael Williams Assistant VP & Controller Thornton Exec. Support Assistant Administrative Services 57950 Cherrylyn Mills-Brown Office Administrator Administrative Services 51112 Judd Enfinger Associate Controller Accounting Services 60998 Sandra Scanlan

  9. Practical Diagnostics for Evaluating Residential Commissioning Metrics

    SciTech Connect (OSTI)

    Wray, Craig; Walker, Iain; Siegel, Jeff; Sherman, Max

    2002-06-11

    In this report, we identify and describe 24 practical diagnostics that are ready now to evaluate residential commissioning metrics, and that we expect to include in the commissioning guide. Our discussion in the main body of this report is limited to existing diagnostics in areas of particular concern with significant interactions: envelope and HVAC systems. These areas include insulation quality, windows, airtightness, envelope moisture, fan and duct system airflows, duct leakage, cooling equipment charge, and combustion appliance backdrafting with spillage. Appendix C describes the 83 other diagnostics that we have examined in the course of this project, but that are not ready or are inappropriate for residential commissioning. Combined with Appendix B, Table 1 in the main body of the report summarizes the advantages and disadvantages of all 107 diagnostics. We first describe what residential commissioning is, its characteristic elements, and how one might structure its process. Our intent in this discussion is to formulate and clarify these issues, but is largely preliminary because such a practice does not yet exist. Subsequent sections of the report describe metrics one can use in residential commissioning, along with the consolidated set of 24 practical diagnostics that the building industry can use now to evaluate them. Where possible, we also discuss the accuracy and usability of diagnostics, based on recent laboratory work and field studies by LBNL staff and others in more than 100 houses. These studies concentrate on evaluating diagnostics in the following four areas: the DeltaQ duct leakage test, air-handler airflow tests, supply and return grille airflow tests, and refrigerant charge tests. Appendix A describes those efforts in detail. In addition, where possible, we identify the costs to purchase diagnostic equipment and the amount of time required to conduct the diagnostics. Table 1 summarizes these data. Individual equipment costs for the 24 practical diagnostics range from a few hundred dollars to many thousands of dollars. The higher costs are associated with infrared thermography and state-of-the-art automated diagnostic systems. Most tests can be performed in one hour or less, using equipment priced toward the lower end of the cost spectrum.

  10. ENVIRONMENTAL ASSESSMENT REGULATORY IMPACT REVIEW/INITIAL REGULATORY FLEXIBILITY

    E-Print Network [OSTI]

    September 23-29, 1991, meeting, the North Pacific Fishery Management Council (Council) adopted Amendment 20 OF A REGULATORY AMENDMENT TO DELAY THE 1992 DIRECTED FISHERY FOR GROUNDFISH WITH TRAWL GEAR IN THE GULF OF ALASKA AND THE BERING SEA AND ALEUTIAN ISLANDS AREA SUMMARY During 1991, the Secretary of Commerce (Secretary) took

  11. nuclearsafety.gc.ca Regulatory update for

    E-Print Network [OSTI]

    Chan, Hue Sun

    Safety Commission REGDOC 1.6.1...more than a name change · RD/GD 371 Licence Application Guide Nuclear · More guidance coming · Targeted availability summer 2014 #12;4Canadian Nuclear Safety Commission;6Canadian Nuclear Safety Commission Thyroid monitoring condition ...lc2046 · RD-58 basis of the condition

  12. Office of the Chief Information Officer DOERM@hq.doe.gov Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of the Chief Information Officer DOERM@hq.doe.gov Office of IT Planning, Architecture and E-government Records Management Division (IM-23) Employee Separation:...

  13. NUREG-0668 MASTER* TITLE LIST PUBLICLY AVAILABLE DOCUMENTS THREE...

    Office of Scientific and Technical Information (OSTI)

    Division of Technical Information and Document Control Office of Administration U. S. Nuclear Regulatory Commission Washington, D.C. 20555 . CONTENTS Page Preface. v...

  14. Waste Confidence Discussion

    Office of Environmental Management (EM)

    Long-Term Waste Confidence Update Christine Pineda Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission National Transportation Stakeholders Forum...

  15. ENVIRONMENTAL ASSESSMENT REGULATORY IMPACT REVIEW

    E-Print Network [OSTI]

    ENVIRONMENTAL ASSESSMENT AND REGULATORY IMPACT REVIEW FOR FISHERY PLAN AMENDMENTS TO PROHIBIT USE 2.0 NEPA REQUIREMENTS: ENVIRONMENTAL IMPACTS OF THE ALTERNATIVES 4 2.1 ENVIRONMENTAL IMPACTS OF THE ALTERNATIVES . . . . . . . . . . . . . . . . . . . . 4 2.2 IMPACTS ON ENDANGERED OR THREATENED SPECIES

  16. California Energy Commission DRAFT STAFF REPORT

    E-Print Network [OSTI]

    demand forecasts, demand-side management and energy efficiency impacts, private supply impacts Project Manager Bill Junker Manager Demand Analysis Office Sylvia Bender Deputy Director Electricity, forecast, peak, self-generation, conservation, demand-side, energy, efficiency, price, retail, end use

  17. California Energy Commission DRAFT COMMITTEE REPORT

    E-Print Network [OSTI]

    demand forecasts, demand-side management and energy efficiency impacts, private supply impacts Gough Project Manager Bill Junker Manager Demand Analysis Office Sylvia Bender Deputy Director, forecast, peak, self-generation, conservation, demand-side, energy, efficiency, price, retail, end use

  18. COMMISSION REPORT FORMS AND INSTRUCTIONS FOR

    E-Print Network [OSTI]

    demand forecasts, demand-side management and energy efficiency impacts, private supply impacts Chris Kavalec Tom Gorin Primary Author(s) Andrea Gough Project Manager Bill Junker Office Manager Demand, forecast, peak, self-generation, conservation, demand-side, energy, efficiency, price, retail, end use

  19. Confortable Performance: Retro-Commissioning Building Operations 

    E-Print Network [OSTI]

    Botan, L.

    2013-01-01

    Operations, Montreal, Quebec, October 8-11, 2013 Tools ? Actuator and system testing ? Sensor Calibration ? Use of Building Automation System trends ? Use of data-loggers 9 ESL-IC-13-10-07a Proceedings of the 13th International Conference for Enhanced... Performance Retro-Commissioning Building Operations Liviu Craiu-Botan, P.Eng. CB Consulting Toronto 1 ESL-IC-13-10-07a Proceedings of the 13th International Conference for Enhanced Building Operations, Montreal, Quebec, October 8-11, 2013 Building...

  20. School Energy Management Through Continuous Commissioning® 

    E-Print Network [OSTI]

    Watt, J.

    2012-01-01

    .00+ per square foot or more (depends on complexity, repair costs, etc.) ? Typical Cost savings when viable candidate is chosen: 15-25% of annual energy cost (more or less, depends on building type and usage) ? The above combination usually results... results in about 1-5% (2.5% on average) increase per year of the originally Cx?d building?s energy consumption? 5 Commissioning | NEW BUILDING ? EXISTING BUILDING That new-building smell is gone, replaced by? well you know. Assuming originally Cx...

  1. National Energy Commission (China) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History ViewMayo, Maryland:NPI Ventures Ltd Jump to: navigation,Naples,Development and ReformCommission

  2. Texas Historical Commission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EISTJ Automation JumpSetIdaho: Energy ResourcesTexasHistorical Commission

  3. Utah Labor Commission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EISTJThin FilmUnited States:UserLabor Commission Jump to: navigation,

  4. Utah Public Service Commission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmental Jump to:EA EISTJThin FilmUnited States:UserLabor Commission Jump to:

  5. California Coastal Commission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX ECoopButte County, California: Energy ResourcesCRED:Calendar Home2015EnergyCommission

  6. The Atomic Energy Commission By Alice Buck

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyThe U.S.Laclede GasEfficiency MaineAuto industry workers retrain(EAP) Commission By

  7. New Mexico Preservation Commission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsourceII Jump to: navigation,NationalJersey/Incentives < New JerseyHydrogenCommission

  8. LINE Commission Visits Idaho National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverseIMPACTThousand CubicResource and JobLCLS Operating3ledp/ The4, LINE Commission

  9. OFFICE of the CHIEF INFORMATION SECURITY OFFICER

    E-Print Network [OSTI]

    Matrajt, Graciela

    security and privacy. Services are designed to help UW units understand risks by analyzing and forecasting Chief Information Security Officer In reflecting back on all our hard work during 2012, I would like of Contents Asset-Based Risk Management

  10. Regulatory Burden RFI: Revitalization of DOE's Role as a Regulatory

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudgetFinancial OpportunitiesofRegulatory BurdenRFIWatchdog |

  11. Idaho Operations Office: Technology summary, June 1994

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This document has been prepared by the Department of Energy`s (DOE) Environmental Management (EM) Office of Technology Development (OTD) in order to highlight research, development, demonstration, testing, and evaluation (RDDT&E) activities funded through the Idaho Operations Office. Technologies and processes described have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US industry`s competitiveness in global environmental markets. OTD programs are designed to make new, innovative, and more cost-effective technologies available for transfer to DOE environmental restoration and waste management end-users. Projects are demonstrated, tested, and evaluated to produce solutions to current problems. Transition of technologies into more advanced stages of development is based upon technological, regulatory, economic, and institutional criteria. New technologies are made available for use in eliminating radioactive, hazardous, and other wastes in compliance with regulatory mandates. The primary goal is to protect human health and prevent further contamination. OTD`s technology development programs address three major problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention. These problems are not unique to DOE, but are associated with other Federal agency and industry sites as well. Thus, technical solutions developed within OTD programs will benefit DOE, and should have direct applications in outside markets.

  12. Fact Sheet: DOE/National Association of Regulatory Utility Commissione...

    Energy Savers [EERE]

    DOENational Association of Regulatory Utility Commissioners Natural Gas Infrastructure Modernization Partnership Fact Sheet: DOENational Association of Regulatory Utility...

  13. Identification and Characterization of Prokaryotic Regulatory Networks: Final Report

    SciTech Connect (OSTI)

    Gary D Stormo

    2012-10-05

    We have completed our characterization of both the transcriptional regulatory network and post-transcriptional regulatory motifs in Shewanella.

  14. Regulatory Endorsement Activities for ASME Nuclear Codes and Standards

    SciTech Connect (OSTI)

    West, Raymond A. [Dominion Nuclear Connecticut, Inc. - Dominion Generation (United States)

    2006-07-01

    The ASME Board on Nuclear Codes and Standards (BNCS) has formed a Task Group on Regulatory Endorsement (TG-RE) that is currently in discussions with the United States Nuclear Regulatory Commission (NRC) to look at suggestions and recommendations that can be used to help with the endorsement of new and revised ASME Nuclear Codes and Standards (NC and S). With the coming of new reactors in the USA in the very near future we need to look at both the regulations and all the ASME NC and S to determine where we need to make changes to support these new plants. At the same time it is important that we maintain our operating plants while addressing ageing management needs of our existing reactors. This is going to take new thinking, time, resources, and money. For all this to take place the regulations and requirements that we use must be clear concise and necessary for safety and to that end both the NRC and ASME are working together to make this happen. Because of the influence that the USA has in the world in dealing with these issues, this paper is written to inform the international nuclear engineering community about the issues and what actions are being addressed under this effort. (author)

  15. MINER{nu}A Test Beam Commissioning

    SciTech Connect (OSTI)

    Higuera, A.; Castorena, J.; Urrutia, Z.; Felix, J.; Zavala, G.

    2009-12-17

    MINER{nu}A Main INjector ExpeRiment {nu}-A is a high-statistic neutrino scattering experiment that will ran in the NuMI Beam Hall at Fermilab. To calibrate the energy response of the MINER{nu}A detector, a beamline is being designed for the MINER{nu}A Test Beam Detector (TBD). The TBD is a replica of the full MINER{nu}A detector at small scale for calibration studies of the main detector. The beamline design consists of the following parts: a copper target, used to generate tertiaries from an incoming secondary beam; a steel collimator for tertiaries, which also serves as a dump for the incoming beam; a time of fight system (scintillator planes); four wire chambers, for angle measurements and tracking; and two dipole magnets, used as an spectrometer. During last October, the first commissioning run of the MINER{nu}A Test Beam took place in the Meson Test Beam Facility at Fermilab. We commissioned the target and collimator of the new tertiary beamline.

  16. NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission

    E-Print Network [OSTI]

    NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From Sacramento, CA 95814 Subject: Filing of Notice of Decision in compliance with Public Resources Code Section oilfield for use in enhanced oil recovery. Modification Description: Modify air quality conditions AQ-17

  17. Regulatory Policy and Markets for Energy Storage in North America

    SciTech Connect (OSTI)

    Kintner-Meyer, Michael CW

    2014-05-14

    The last 5 years have been one of the most exciting times for the energy storage industry. We have seen significant advancements in the regulatory process to make accommodations for valuing and monetizing energy storage for what it provides to the grid. The most impactful regulatory decision for the energy storage industry has come from California, where the California Public Utilities Commission issued a decision that mandates procurement requirements of 1.325 GW for energy storage to 3 investor-own utilities in 4 stages: in 2014, 2016, 2018, and 2020. Furthermore, at the Federal level, FERC’s Order 755, requires the transmission operators to develop pay for performance tariffs for ancillary services. This has had direct impact on the market design of US competitive wholesale markets and the monetization of fast responding grid assets. While this order is technology neutral, it clearly plays into the fast-responding capability of energy storage technologies. Today PJM, CAISO, MISO, NYISO, and NE-ISO have implemented Order 755 and offer new tariff for regulation services based on pay-for-performance principles. Furthermore, FERC Order 784, issued in July 2013 requires transmission providers to consider speed and accuracy in determining the requirements for ancillary services. In November 2013, FERC issued Order 972, which revises the small generator interconnection agreement which declares energy storage as a power source. This order puts energy storage on par with existing generators. This paper will discuss the implementation of FERC’s Pay for Performance Regulation order at all ISOs in the U.S. under FERC regulatory authority (this excludes ERCOT). Also discussed will be the market impacts and overall impacts on the NERC regulation performance indexes. The paper will end with a discussion on the California and Ontario, Canada procurement mandates and the opportunity that it may present to the energy storage industry.

  18. Economic and regulatory aspects of cogeneration: the implementation of Section 210 of the Public Utility Regulatory Policies Act of 1978

    SciTech Connect (OSTI)

    Vincent, J.W.

    1982-01-01

    In February of 1980 the Federal Energy Regulatory Commission (FERC) promulgated a set of rules that were to commence the implementation process of Section 210 of the Public Utility Regulatory Policies Act of 1978 (PURPA). Of particular interest to economists are the pricing provisions in the rules that pertain to integrating dispersed sources of electric power generation into conventional electric utility systems. The full avoided cost pricing provision couples a utility mandate to purchase power from qualified dispersed facilities (cogenerators, wind power, small hydro facilities, etc., hereafter denoted QFs) with the requirement that the price the utility pays for such purchases be equal to the full extent of the cost it avoids by not generating the power itself. The simultaneous purchase and sale billing scheme requires a utility to purchase the gross power output of a QF at the full avoided cost rate and simultaneously sell back to the QF its power requirement on the applicable retail tariff. Theoretical investigation of these two provisions reveals that, properly defined, they are consistent with improving economic signals with respect to electricity generation.

  19. Regulatory Processes | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuildingBudgetFinancial OpportunitiesofRegulatory BurdenRFIWatchdog

  20. Regulatory Processes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |ProjectKnowRedox ShuttleRegister forRegulatory

  1. Office Of Nuclear Energy

    Broader source: Energy.gov (indexed) [DOE]

    Office Of Nuclear Energy Sensors and Instrumentation Annual Review Meeting Enhanced Micro-Pocket Fission Detector (MPFD) for High Temperature Reactors Troy Unruh Idaho National...

  2. Office of Physical Protection

    Broader source: Energy.gov [DOE]

    The Office of Physical Protection is comprised of a team of security specialists engaged in providing Headquarters-wide physical protection.

  3. Government Printing Office Requirements

    Broader source: Energy.gov [DOE]

    This section describes the Government Printing Office (GPO) requirements for all print materials, whether printed electronically or on paper. This includes requirements for printing and copying for...

  4. Site Office Manager, Princeton

    Broader source: Energy.gov [DOE]

    A successful candidate in this position will serve as the Princeton Site Office (PSO) Manager by providing overall executive leadership to the PSO.

  5. Vehicle Technologies Office: News

    Broader source: Energy.gov [DOE]

    EERE intends to issue, on behalf of its Fuel Cell Technologies Office, a Funding Opportunity Announcement (FOA) entitled "Fuel Cell Technologies Incubator: Innovations in Fuel Cell and Hydrogen...

  6. Building Technologies Office

    Broader source: Energy.gov (indexed) [DOE]

    Technologies Office Richard Karney, P.E. May 8, 2014 40% 60% National Energy Consumption Reducing consumption or improving performance calls for cutting-edge...

  7. Solar Energy Technologies Office

    Office of Energy Efficiency and Renewable Energy (EERE)

    In 2011, the Energy Department's Solar Energy Technologies Office (SETO) became the SunShot Initiative, a collaborative national effort that aggressively drives innovation to make solar energy...

  8. Impact of Continuous Commissioning® on the Energy Star® Rating of Hospitals and Office Buildings 

    E-Print Network [OSTI]

    Kulkarni, Aditya Arun

    2012-02-14

    by its initial ESR, while its location has no impact on improvement. The improvement in ESR is observed to be almost linearly proportional to the percentage of energy saved. For 10% - 20% reductions in energy use typical of the CC® process, the ESR...

  9. Monitoring-based HVAC Commissioning of an Existing Office Building for Energy Efficiciency

    E-Print Network [OSTI]

    Wang, Liping

    2014-01-01

    of Existing and Low Energy Buildings. 2010. [11] Portlandfor Existing and Low Energy Building - Final Report onsystems and low-energy buildings. • With the increasing

  10. Continuous Commissioning® of a Single Fan Dual Duct System in an Office Building 

    E-Print Network [OSTI]

    Dong, D.; Liu, M.

    2005-01-01

    Secondary organic aerosols (SOA) comprise a substantial fraction of the total global aerosol budget. While laboratory studies involving smog chambers have advanced our understanding of the formation mechanisms responsible for SOA, our knowledge...

  11. Monitoring-based HVAC Commissioning of an Existing Office Building for Energy Efficiciency

    E-Print Network [OSTI]

    Wang, Liping

    2014-01-01

    GP-21, and GP-23) and three boilers (BR3, BR4 and BR5); thefan BL1 during unoccupied hours 4.2 Boiler performance Thereare three main boilers, labeled as BR3, BR4, and BR5, in the

  12. ATOMIC ENERGY COMMISSION Refer to File No. AEGR-1 The CommandinS Officer '

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-SessionsSouth DakotaRobbins and Myers Co -VANaval Ordnance,:n5.5.8GE. aw''*>I

  13. INITIAL COMMISSIONING OF NDCX-II

    SciTech Connect (OSTI)

    Lidia, S.; Arbelaez, D.; Greenway, W.; Jung, J. -Y.; Kwan, J.; Lipton, T.; Pekedis, A.; Roy, P.; Seidl, P.; Takakuwa, J.; Waldron, W.; Friedman, A.; Grote, D.; Sharp, W.; Gilson, E.

    2012-05-15

    The Neutralized Drift Compression Experiment-II (NDCX-II) will generate ion beam pulses for studies of Warm Dense Matter and heavy-ion-driven Inertial Fusion Energy. The machine will accelerate 20-50 nC of Li+ to 1.2-3 MeV energy, starting from a 10.9-cm alumino-silicate ion source. At the end of the accelerator the ions are focused to a sub-mm spot size onto a thin foil (planar) target. The pulse duration is compressed from ~;;500 ns at the source to sub-ns at the target following beam transport in a neutralizing plasma. We first describe the injector, accelerator, transport, final focus and diagnostic facilities. We then report on the results of early commissioning studies that characterize beam quality and beam transport, acceleration waveform shaping and beam current evolution. We present simulation results to benchmark against the experimental measurements.

  14. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in New York. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the New York Public Service Commission. The Commission is composed of five members appointed by the governor with the advice and consent of the senate. Commissioners are appointed for six-year terms. Commissioners may not have any pecuniary or financial interest in any public utility. Local governing bodies are authorized to exercise such power, jurisdiction and authority in enforcing the laws of the state and the orders, rules, and regulations of the commission as may be prescribed by statute or by the commission with respect to public utilities. A Commission spokesman confirmed that no statutes have been passed pursuant to this provision and the Commission has not ceded any of its regulatory powers to local governments. With the exception of the granting of franchises and permits to use public ways, local governments exercise no regulatory powers over public utilities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  15. Richard Lazarus Named as Executive Director of National Commission...

    Energy Savers [EERE]

    Lazarus Named as Executive Director of National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling Richard Lazarus Named as Executive Director of National...

  16. Sandia Energy - Sandia-AREVA Commission Solar Thermal/Molten...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sandia-AREVA Commission Solar ThermalMolten Salt Energy-Storage Demonstration Home Renewable Energy Energy Facilities Partnership Capabilities News SunShot News & Events...

  17. Memorandum on the Interim Report of the Commission to Review...

    Energy Savers [EERE]

    on the Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories The SEAB Task Force on DOE National Laboratories was established by...

  18. Retro-Commissioning for Regulators of Ratepayer-Funded Programs

    SciTech Connect (OSTI)

    Existing Commercial Buildings Working Group

    2012-05-23

    Describes how customer usage data can help promote the adoption of retro-commissioning polices for public and private commercial buildings.

  19. Idaho Public Utilities Commission Approves Neal Hot Springs Power...

    Open Energy Info (EERE)

    Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Idaho Public...

  20. Including Retro-Commissioning in Federal Energy Savings Performance...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Including Retro-Commissioning in Federal Energy Savings Performance Contracts Enabling Mass-Scale Financing for Federal Energy, Water, and...

  1. Results and commissioning issues from an automated demand response pilot

    E-Print Network [OSTI]

    Piette, Mary Ann; Watson, Dave; Sezgen, Osman; Motegi, Naoya

    2004-01-01

    of Fully Automated Demand Response in Large Facilities"Management and Demand Response in Commercial Buildings", L Band Commissioning Issues from an Automated Demand Response.

  2. Chapter 9 of the Wyoming Public Service Commission Regulations...

    Open Energy Info (EERE)

    of the Wyoming Public Service Commission Regulations: General Forms Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation:...

  3. Chapter 2 of the Wyoming Public Service Commission Regulations...

    Open Energy Info (EERE)

    Chapter 2 of the Wyoming Public Service Commission Regulations: General Regulations Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  4. Guidelines and Checklist for Commissioning and Government Acceptance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Contract Clauses for Government Acceptance of ESPC Projects Commissioning Guidance for ESPCs Study Guide for Photovoltaic System Installers and Sample Examination Questions...

  5. Task Force for Strategic Developments to Blue Ribbon Commission...

    Office of Environmental Management (EM)

    Blue Ribbon Commission Report and Transportation Program Corinne Macaluso National Transportation Stakeholders Forum Knoxville, Tennessee May 16, 2012 2 Formed at the direction...

  6. Automated Proactive Techniques for Commissioning Air-Handling Units

    SciTech Connect (OSTI)

    Katipamula, Srinivas ); Brambley, Michael R. ); Luskay, Larry

    2003-08-30

    Many buildings today use sophisticated building automation systems (BASs) to manage a wide and varied range of building systems. Although the capabilities of the BASs seem to have increased over time, many buildings still are not properly commissioned, operated or maintained. Lack of or improper commissioning, the inability of the building operators to grasp the complex controls, and lack of proper maintenance leads to inefficient operations and reduced lifetimes of the equipment. If regularly scheduled manual maintenance or re-commissioning practices are adopted, they can be expensive and time consuming. Automated proactive commissioning and diagnostic technologies address two of the main barriers to commissioning: cost and schedules. Automated proactive continuous commissioning tools can reduce both the cost and time associated with commissioning, as well as enhance the persistence of commissioning fixes. In the long run, automation even offers the potential for automatically correcting problems by reconfiguring controls or changing control algorithms dynamically. This paper will discuss procedures and processes that can be used to automate and continuously commission the economizer operation and outdoor-air ventilation systems of an air-handling unit.

  7. Sustainability Performance Office | Department of Energy

    Office of Environmental Management (EM)

    Performance Office Sustainability Performance Office The U.S. Department of Energy (DOE) Sustainability Performance Office (SPO) oversees departmental sustainability...

  8. A Characteristics-Based Approach to Radioactive Waste Classification in Advanced Nuclear Fuel Cycles

    E-Print Network [OSTI]

    Djokic, Denia

    2013-01-01

    NRC  2008   Nuclear   Regulatory   Commission,   “Response  neptunium   Nuclear  Regulatory  Commission   Neptunium  (bodies,   the   Nuclear   Regulatory   Commission   (NRC)  

  9. Building geothermal research and development partnerships: The California Energy Commission`s geothermal program

    SciTech Connect (OSTI)

    Hare, R.; Tiangco, V.; Birkinshaw, K.; Johannis, M.

    1995-12-31

    The California Energy Commission`s Geothermal Program (Assembly Bill 1905, Bosco) has built cost-shared Research, Development and Demonstration (RD&D) partnerships with over 150 public and private entities. The Geothermal Program promotes the development of new geothermal resources and technologies for both direct-use and electricity generation while protecting the environment and promoting energy independence. This is accomplished by providing financial and technical assistance in the form of contingent awards which, depending on project success, can become either a loan or a grant. Some of the cost-shared RD&D accomplishments are presented. The process and requirements to obtain financial assistance through the Geothermal Program are summarized.

  10. UC Sustainability Office Report

    E-Print Network [OSTI]

    Hickman, Mark

    UC Sustainability Office Report Introduction Welcome to the third annual UC Sustainability Office infrastructure, UC is now trending in a positive direction against some sustainability indicators. Electricity products and membership of the UC Sustainability Community is growing. There are concerns around the amount

  11. FRASER POLLUTION ABATEMENT OFFICE

    E-Print Network [OSTI]

    #12;-. FRASER POLLUTION ABATEMENT OFFICE 1992-93 Progress Report By MaggieM. Paquet MAIAPublishingLtd. 302 E. 6th Street NorthVancouver,BC V7L 1P6 For FraserPollutionAbatementOffice EnvironmentCanada 224W objectives of FRAP is to clean up pollution in the Fraser River Basin. This objective depends on pollution

  12. FRASER POLLUTION ABATEMENT OFFICE

    E-Print Network [OSTI]

    #12;FRASER POLLUTION ABATEMENT OFFICE PROGRESS REPORT 1994-95 Prepared By Maggie M. Paquet MAIA Publishing Ltd. Vancouver, BC For Technology and Pollution Prevention Section Fraser River Action Plan Environment Canada, FPAO Progress Report 1994-1995 ACKNOWLEDGEMENTS The Fraser Pollution Abatement Office

  13. Europaisches Patent Office

    E-Print Network [OSTI]

    Vertes, Akos

    (19) (12) Europaisches Patentamt European Patent Office Office europeen des brevets 11111~11111111111111111"11111111111111111"11""1111111111II~,,~1111 (11) EP 2 356 668 81 EUROPEAN PATENT SPECIFICATION (86) International application number: PCT/US2009/065891 (45) Date of publication and mention of the grant of the patent: 17.07.2013 Bulletin

  14. KALELE ROAD Parking Office

    E-Print Network [OSTI]

    FREEWAY H1 KALELE ROAD Parking Office on ground floor Bike Rack Locations Bike Lockers BICYCLE RACK Hale Kahawai Environmental Protection Services Federal Credit Union Energy House & Safety Office Bus Shelter Bus Shelter Art Building Sustainability Courtyard Kuykendall Hall Campus Center Jakuan Tea

  15. United States Atomic Energy Commission formed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking With WIPPfinalUnexpected Angular DependenceService Testing:OFFICE

  16. Appointment of Contracting Officers and Contracting Officer Representatives

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-04-21

    The Order established procedures governing the selection, appointment and termination of Department of Energy contracting officers and contracting officer representatives. Supersedes DOE O 541.1A.

  17. The Office of Independent Enterprise Assessments' Office of Enforcemen...

    Broader source: Energy.gov (indexed) [DOE]

    Steve Simonson, Director of the Office of Enforcement, addresses the 2014 DOE Safety and Security Enforcement Workshop attendees. Steve Simonson, Director of the Office of...

  18. Regulatory Requirements | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100 Winners * ImpactsandRegardingRegistration PrintRegulatoryNUCLEARRegulatory

  19. Environmental regulatory update table, July 1991

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-08-01

    This Environmental Regulatory Update Table (July 1991) provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  20. Environmental Regulatory Update Table, December 1989

    SciTech Connect (OSTI)

    Houlbert, L.M.; Langston, M.E. ); Nikbakht, A.; Salk, M.S. )

    1990-01-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  1. Environmental Regulatory Update Table, December 1991

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1992-01-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  2. Environmental Regulatory Update Table, September 1991

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-10-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  3. Environmental Regulatory Update Table, November 1991

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-12-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  4. Environmental Regulatory Update Table, October 1991

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-11-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  5. Environmental Regulatory Update Table, August 1991

    SciTech Connect (OSTI)

    Houlberg, L.M., Hawkins, G.T.; Salk, M.S.

    1991-09-01

    This Environmental Regulatory Update Table (August 1991) provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  6. Environmental Regulatory Update Table, October 1990

    SciTech Connect (OSTI)

    Houlberg, L.M.; Noghrei-Nikbakht, P.A.; Salk, M.S.

    1990-11-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  7. Risd-M-1591 jo Danish Atomic Energy Commission

    E-Print Network [OSTI]

    March 1973 R-5-73 Available on raqvaat from: Library of the Danish Atomic Enorgy Commission (Aton on request from the Library of the Danish Atomic Energy Commission (Atomenergikommissionens Bibliotek), Risø Section I Situation Today Section II Important Trends and Developments 13 Section III Developments

  8. California Energy Commission Alternative and Renewable Fuel and Vehicle Technology

    E-Print Network [OSTI]

    California Energy Commission Alternative and Renewable Fuel and Vehicle Technology Program Advisory by the Energy Commission. Under the Program, the following shall be eligible for funding: 3 · Alternative, Statutes of 2007) created the Alternative and Renewable Fuel and Vehicle Technology Program (hereinafter

  9. California Energy Commission www.energy.ca.gov

    E-Print Network [OSTI]

    California Energy Commission www.energy.ca.gov TECHNICAL ASSISTANCE TO PUBLIC AGENCIES Request Program o Energy Partnership Technical Assistance Program o Energy Conservation Assistance Act (ECAA) Loan Program · RFQ Overview · How to Respond to this RFQ · Questions and Answers California Energy Commission

  10. COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 28.6.2006

    E-Print Network [OSTI]

    programme of the European Atomic Energy Community (Euratom) for nuclear research and training activities Energy Community (Euratom) for nuclear research and training activities (2007 to 2011)1 . The CommissionEN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 28.6.2006 COM(2006) 364 final 2005/0043(COD

  11. Commission on the Future of the University Introduction

    E-Print Network [OSTI]

    Huang, Wei

    their individual school plans to integrate emerging strategies developed by the Commission. Final school plans. The Commission will produce a final report before the end of the 2007 fall semester for the President's review dean will produce a three-page executive summary that outlines two-, six-, and ten-year plans for her

  12. Unique Regulatory Approach for Licensing the Port Hope Remediation Project in Canada - 13315

    SciTech Connect (OSTI)

    Kostova, M.; Howard, D.; Elder, P.

    2013-07-01

    The Port Hope remediation project is a part of a larger initiative of the Canadian Federal Government the Port Hope Area Initiative (PHAI) which is based upon a community proposal. The Government of Canada, through Natural Resources Canada (NRCan) is investing $1.28 billion over 10 years to clean up historic low-level radioactive waste in the Port Hope Area and to provide long-term safe management of the low-level radioactive wastes in the Port Hope Area. These wastes arose from the activities of a former Federal Crown Corporation (Eldorado Nuclear) and its private sector predecessors. In Canada, historic waste are defined as low-level radioactive waste that was managed in a manner no longer considered acceptable, but for which the original producer cannot reasonably be held responsible or no longer exists and for which the Federal Government has accepted responsibility. In Canada, under the current regulatory framework, the environmental remediation is not considered as a distinct phase of the nuclear cycle. The regulatory approach for dealing with existing sites contaminated with radioactive residues is defined on the basis of risk and application of existing regulations. A unique regulatory approach was taken by the Canadian Nuclear Safety Commission (CNSC) to address the various licensing issues and to set out the requirements for licensing of the Port Hope Project within the current regulatory framework. (authors)

  13. Technical and Regulatory Guidance Technical and Regulatory Guidance for Design, Installation,

    E-Print Network [OSTI]

    Zornberg, Jorge G.

    Technical and Regulatory Guidance Technical and Regulatory Guidance for Design, Installation in the document. The technical implications of any information or guidance contained in this document may vary, ITRC recommends also consulting applicable standards, laws, regulations, suppliers of materials

  14. Regulatory Policy Guide/Game Concept Paper

    SciTech Connect (OSTI)

    Driving Ratepayer-Funded Efficiency through Regulatory Policies Working Group

    2011-09-01

    Proposes a new resource for utility regulators to plot a course through regulatory options available to surmount barriers to aggressive and sustained utility investment in energy efficiency programs.

  15. Geothermal Regulatory Roadmap | OpenEI Community

    Open Energy Info (EERE)

    References Geothermal Regulatory Roadmap featured on NREL Now Texas Legal Review GRR 3rd Quarter - Stakeholder Update Meeting more Group members (12) Managers: Kyoung Recent...

  16. Seamless Transport Policy: Institutional and Regulatory Aspects...

    Open Energy Info (EERE)

    Seamless Transport Policy: Institutional and Regulatory Aspects of Inter-Modal Coordination Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Seamless Transport Policy:...

  17. EAC Recommendations Regarding Emerging and Alternative Regulatory...

    Office of Environmental Management (EM)

    Tools to Assist in Analysis (September 2014) EAC Recommendations Regarding Emerging and Alternative Regulatory Models and Modeling Tools to Assist in Analysis (September 2014)...

  18. REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT: Natural...

    Energy Savers [EERE]

    FORMAT: Natural Gas Use in Transportation REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT: Natural Gas Use in Transportation RCC Workplan NGV.PDF More Documents &...

  19. HYTEST Phase I Facility Commissioning and Modeling

    SciTech Connect (OSTI)

    Lee P. Shunn; Richard D. Boardman; Shane J. Cherry; Craig G. Rieger

    2009-09-01

    The purpose of this document is to report the first year accomplishments of two coordinated Laboratory Directed Research and Development (LDRD) projects that utilize a hybrid energy testing laboratory that couples various reactors to investigate system reactance behavior. This work is the first phase of a series of hybrid energy research and testing stations - referred to hereafter as HYTEST facilities – that are planned for construction and operation at the Idaho National Laboratory (INL). A HYTEST Phase I facility was set up and commissioned in Bay 9 of the Bonneville County Technology Center (BCTC). The purpose of this facility is to utilize the hydrogen and oxygen that is produced by the High Temperature Steam Electrolysis test reactors operating in Bay 9 to support the investigation of kinetic phenomena and transient response of integrated reactor components. This facility provides a convenient scale for conducting scoping tests of new reaction concepts, materials performance, new instruments, and real-time data collection and manipulation for advance process controls. An enclosed reactor module was assembled and connected to a new ventilation system equipped with a variable-speed exhaust blower to mitigate hazardous gas exposures, as well as contract with hot surfaces. The module was equipped with a hydrogen gas pump and receiver tank to supply high quality hydrogen to chemical reactors located in the hood.

  20. AEgIS experiment commissioning at CERN

    SciTech Connect (OSTI)

    Krasnicky, D.; Aghion, S.; Amsler, C.; Ariga, A.; Ariga, T.; Ereditato, A.; Kawada, J.; Kimura, M.; Pistillo, C.; Scampoli, P.; Storey, J.; Belov, A. S.; Gninenko, S. N.; Bonomi, G.; Subieta Vasquez, M. A.; Braeunig, P.; Oberthaler, M. K.; Brusa, R. S.; Di Noto, L.; Mariazzi, S.; and others

    2013-03-19

    The AEgIS Experiment is an international collaboration based at CERN whose aim is to perform the first direct measurement of the gravitational acceleration g of antihydrogen in the gravitational field of the Earth. Cold antihydrogen will be produced with a pulsed charge exchange reaction in a cylindrical Penning trap where antiprotons will be cooled to 100mK. The cold antihydrogen will be produced in an excited Rydberg state and subsequently formed into a beam. The deflection of the antihydrogen beam will be measured by using Moire deflectometer gratings. After being approved in late 2008, AEgIS started taking data in a commissioning phase early 2012. This report presents an overview of the AEgIS experiment, describes its current status and shows the first measurements on antiproton catching and cooling in the 5 T Penning catching trap. We will also present details on the techniques needed for the 100mK antihydrogen production, such as pulsed positronium production and its excitation with lasers.