Powered by Deep Web Technologies
Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Nuclear Regulatory Commission Information Digest, 1991 edition  

Science Conference Proceedings (OSTI)

The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs.

Olive, K L

1991-03-01T23:59:59.000Z

2

Regulatory Commission of Alaska | Open Energy Information  

Open Energy Info (EERE)

Regulatory Commission of Alaska Regulatory Commission of Alaska Jump to: navigation, search Logo: Regulatory Commission of Alaska Name Regulatory Commission of Alaska Address 701 West Eight Ave., Suite 300 Place Anchorage, Alaska Zip 99501-3469 Phone number 907-276-6222 Website http://rca.alaska.gov/RCAWeb/h Coordinates 61.2143463°, -149.8931523° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":61.2143463,"lon":-149.8931523,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

3

Federal Energy Regulatory Commission | Open Energy Information  

Open Energy Info (EERE)

Energy Regulatory Commission Energy Regulatory Commission Jump to: navigation, search Logo: Federal Energy Regulatory Commission Name Federal Energy Regulatory Commission Address 888 First Street, N.E. Place Washington, District of Columbia Zip 20426 Phone number 1-866-208-3676 Website http://www.ferc.gov/contact-us Coordinates 38.90145°, -77.006248° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.90145,"lon":-77.006248,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

4

ORISE: U.S. Nuclear Regulatory Commission Radiation Exposure Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Information and Reporting System (REIRS) Information and Reporting System (REIRS) ORISE maintains large database of radiation exposure records for the U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Radiation Exposure Information and Reporting System (REIRS) The U.S. Nuclear Regulatory Commission (NRC) is required by federal mandate to maintain and evaluate radiation protection data for workers at facilities that it licenses. As part of its mission of safety, the NRC operates the Radiation Exposure Information and Reporting System (REIRS), a database system containing all occupational radiation exposure records that have been submitted to the NRC under 10 CFR Part 20. REIRS encompasses 1,800-plus NRC licensees and contains more than five million records for more than one million monitored individuals.

5

Nuclear Regulatory Commission Information Digest 1994 edition. Volume 6  

SciTech Connect

The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRCs regulatory responsibility the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear-and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1993, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

Stadler, L.

1994-03-01T23:59:59.000Z

6

US Nuclear Regulatory Commission Input to DOE Request for Information Smart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

US Nuclear Regulatory Commission Input to DOE Request for US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input. Comments relevant to the following two sections of the RFI: "Long Term Issues: Managing a Grid with High Penetration of New Technologies" and "Reliability and Cyber-Security," US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input More Documents & Publications Comments of DRSG to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges Reply Comments of Entergy Services, Inc. Progress Energy draft regarding Smart Grid RFI: Addressing Policy and

7

EVALUATING INTERNAL STAKEHOLDER PERSPECTIVES ON RISK-INFORMED REGULATORY PRACTICES FOR THE NUCLEAR REGULATORY COMMISSION  

SciTech Connect

The U.S. Nuclear Regulatory Commission's (NRC) Office of Nuclear Reactor Regulation has begun a program to create a risk-informed environment within the reactor program. The first step of the process is to evaluate the existing environment and internal NRC stakeholder perceptions of risk-informed regulatory practices. This paper reports on the results of the first phase of this evaluation: assessing the current environment, including the level of acceptance of risk-informed approaches throughout the reactor program, the level of integration, areas of success, and areas of difficulty. The other two phases of the evaluation will identify barriers to the integration of risk into NRC activities and gather input on how to move to a risk-informed environment.

Peterson, L.K.; Wight, E.H.; Caruso, M.A.

2003-02-27T23:59:59.000Z

8

NUCLEAR REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 21, 1999 (Volume 64, Number 244)] December 21, 1999 (Volume 64, Number 244)] [Proposed Rules] [Page 71331-71333] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr21de99-21] ======================================================================= ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION 10 CFR Parts 71 and 73 RIN 3150-AG41 Advance Notification to Native American Tribes of Transportation of Certain Types of Nuclear Waste AGENCY: Nuclear Regulatory Commission. ACTION: Advance notice of proposed rulemaking. ----------------------------------------------------------------------- SUMMARY: The Nuclear Regulatory Commission (NRC) is considering an amendment to its regulations that would require NRC licensees to notify

9

The use of information systems to transform utilities and regulatory commissions: The application of geographic information systems  

SciTech Connect

One technology that can assist utilities remain financially viable in competitive markets and help utilities and regulators to better serve the public is information technology. Because geography is an important part of an electric, natural gas, telecommunications, or water utility, computer-based Geographic Information Systems (GIS) and related Automated Mapping/Facilities Management systems are emerging as core technologies for managing an ever-expanding variety of formerly manual or paper-based tasks. This report focuses on GIS as an example of the types of information systems that can be used by utilities and regulatory commissions. Chapter 2 provides general information about information systems and effects of information on organizations; Chapter 3 explores the conversion of an organization to an information-based one; Chapters 4 and 5 set out GIS as an example of the use of information technologies to transform the operations of utilities and commissions; Chapter 6 describes the use of GIS and other information systems for organizational reengineering efforts; and Chapter 7 examines the regulatory treatment of information systems.

Wirick, D.W.; Montgomery, G.E.; Wagman, D.C.; Spiers, J.

1995-09-01T23:59:59.000Z

10

United States Nuclear Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

qU oSoLTJRC qU oSoLTJRC United States Nuclear Regulatory Commission Protecting People and the Environment NUREG-1872, Vol. 2 HudcD [jE©wftamfsýýpc Wafm(M oran EA Office of New Reactors AVAILABILITY OF REFERENCE MATERIALS IN NRC PUBLICATIONS NRC Reference Material As of November 1999, you may electronically access NUREG-series publications and other NRC records at NRC's Public Electronic Reading Room at http:t/www.nrc..ov/reading-rm.html. Publicly released records include, to name a few, NUREG-series publications; Federal Register notices; applicant, licensee, and vendor documents and correspondence; NRC correspondence and internal memoranda; bulletins and information notices; inspection and investigative reports; licensee event reports; and Commission papers and their attachments.

11

THE FEDERAL ENERGY REGULATORY COMMISSION'S UNCLASSIFIED CYBER...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

THE FEDERAL ENERGY REGULATORY COMMISSION'S UNCLASSIFIED CYBER SECURITY PROGRAM 2002, IG-0569 THE FEDERAL ENERGY REGULATORY COMMISSION'S UNCLASSIFIED CYBER SECURITY PROGRAM 2002,...

12

Nuclear Regulatory Commission issuances  

Science Conference Proceedings (OSTI)

This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

Not Available

1994-03-01T23:59:59.000Z

13

Nuclear Regulatory Commission issuances  

SciTech Connect

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

NONE

1997-11-01T23:59:59.000Z

14

Nuclear Regulatory Commission issuances  

Science Conference Proceedings (OSTI)

This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

NONE

1996-04-01T23:59:59.000Z

15

Reliability and the Federal Energy Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and the Federal Reliability and the Federal and the Federal Reliability and the Federal Energy Regulatory Energy Regulatory Commission Commission Michael Peters Michael Peters Energy Infrastructure & Cyber Security Advisor Energy Infrastructure & Cyber Security Advisor Federal Energy Regulatory Commission Federal Energy Regulatory Commission 202 202 - - 502 502 - - 8461 8461 Michael.Peters@FERC.GOV Michael.Peters@FERC.GOV The views expressed in this The views expressed in this presentation do not represent the presentation do not represent the views of the Federal Energy views of the Federal Energy Regulatory Commission or the United Regulatory Commission or the United States. States. These views are the personal opinion These views are the personal opinion of Mike Peters!!!! of Mike Peters!!!! ☺ ☺ ☺ ☺ ☺ ☺

16

Nuclear Regulatory Commission Regulatory and Licensing Matters | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Commission Regulatory and Licensing Matters Regulatory Commission Regulatory and Licensing Matters Nuclear Regulatory Commission Regulatory and Licensing Matters GC-52 provides legal advice to DOE regarding Nuclear Regulatory Commission (NRC) regulatory and licensing matters of interest to DOE, either as an NRC license applicant or in connection with related authorities and responsibilities of DOE and NRC on nuclear material, nuclear waste, and nuclear nonproliferation matters. GC-52 attorneys provide advice and support on a variety of NRC matters including regulation and licensing of DOE independent spent fuel storage facilities (ISFSIs) and a mixed-oxide fuel fabrication facility, consultation with NRC on certain DOE waste determinations, and imports and exports of nuclear materials and radioactive sealed sources.

17

Department of Energy and Nuclear Regulatory Commission Increase...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership Department of Energy and Nuclear Regulatory Commission Increase Cooperation to...

18

Energy Praises the Nuclear Regulatory Commission Approval of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the...

19

KWOC (Key-Word-Out-of-Context) Index of US Nuclear Regulatory Commission Regulatory Guide Series  

SciTech Connect

To meet the objectives of the program funded by the Department of Energy (DOE)-Nuclear Energy (NE) Technology Support Programs, the Performance Assurance Project Office (PAPO) administers a Performance Assurance Information Program that collects, compiles, and distributes program-related information, reports, and publications for the benefit of the DOE-NE program participants. THE KWOC Index of US Nuclear Regulatory Commission Regulatory Guide Series'' is prepared as an aid in searching for specific topics in the US Nuclear Regulatory Commission, Regulatory Guide Series.

Jennings, S.D.

1990-04-01T23:59:59.000Z

20

NUCLEAR REGULATORY,.COMMISSION REGION I  

Office of Legacy Management (LM)

REGULATORY,.COMMISSION REGULATORY,.COMMISSION REGION I lY,.COMMISSION 475 ALLENDALE ROAD KlNG OF PRUSSIA. PENNSYLVANIA 194061415 GION I NOALE ROAD ENNSYLVANlA 194061415 MAY I5 1996 MAY I5 1996 Docket No. 040-07964 License No. SlJ (Rs Heyman Properties Attention: Mr. John S. Russo Facility Manager 333 Post Road West Westport, CT 06881 SUBJECT: INSPECTION NO. 040-07964/96-001 Dear Mr. Russo: On April 15, 1996, Todd J. Jackson of this office conducted a routine inspection at 737 Canal Street, Stamford, Connecticut of activities o Oliver Incorporated, authorized by Atomic Energy Commission (AEC) Lit SUB-00967. The inspection consisted of observations by the inspect0 interviews with personnel, and a radiological survey by the inspector Jackson was accompanied on this inspection by representatives of the

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

UNITED STATES NUCLEAR REGULATORY COMMISSION  

Office of Legacy Management (LM)

WASHINGTON, 0. C. 20555 WASHINGTON, 0. C. 20555 AUG i 3 1979 ,,~---Y--*. FCAF:Wi3 )I 70-364 : i: SNM-414,jAmendment No. 3 --A Babcock and Wilcox Company Nuclear Materials Division ATTN: Mr. Michael A. Austin Manager, Technical Control 609 North Warren Avenue Apollo, Pennsylvania 15613 Gentiemen: (1 i' \ (. \ In accordance with your application dated June 18, 1979, and pursuant to Title 10, Code of Federal Regulations, Part 70, Materials License SNM-414 is hereby amended to: 1. Delete the function of the Regulatory Projects Coordinator, and 2. Alter the experience requirements for the function of Licensing and Nuclear Safety Specialist. Replacement pages for the license and condition section of the application are attached. Included are changes to License SNM-414 pages to reflect

22

141111111111111111 Federal Energy Regulatory Commission  

E-Print Network (OSTI)

347) requires federal agencies to annually report their security and privacy programs. The Office of Management and Budget (OMB) provides instructions on complying with the requirements of FISMA. On July 17, 2006, OMB issued a memorandum for heads of executive departments and agencies, M-06-20, FY 2006 Reporting Instructions for the Federal Information Security Management Act and Agency Privacy Management requiring each agency to determine continued compliance with its public websites posted privacy policy. To that end, FERC will compare its information collection practices on its website with its posted FERC website privacy policy annually to ensure compliance with its stated website privacy policy. 2.0 PURPOSE The purpose of this document is to establish FERC policy and procedures on auditing its compliance with its posted website privacy policy.

unknown authors

2008-01-01T23:59:59.000Z

23

Executive Director for Operations CONSIDERATION OF ECONOMIC CONSEQUENCES WITHIN THE U.S. NUCLEAR REGULATORY COMMISSIONS REGULATORY FRAMEWORK  

E-Print Network (OSTI)

The purpose of this Commission paper (SECY) is to provide the Commission with information and options to address to what extent, if any, the U.S. Nuclear Regulatory Commissions (NRCs) regulatory framework should be modified regarding its consideration of the economic consequences of an unintended release of licensed nuclear materials to the environment. SUMMARY: The accident at the Fukushima Dai-ichi nuclear power plant in Japan initiated discussion of how the NRCs regulatory framework considers offsite property damage and other economic consequences caused by a significant radiological release from an NRC-licensed facility and licensed material. In response to this discussion, on April 6, 2012, the Office of the Executive Director for Operations (OEDO) directed the staff (see Enclosure 1, Tasking for RES) to provide a notation vote paper to the Commission on how the NRCs regulatory framework currently considers the economic consequences associated with the unintended 1 release of licensed nuclear material to the environment and alternatives for Commission consideration. CONTACT:

R. W. Borchardt; Alysia Bone Res/dra

2012-01-01T23:59:59.000Z

24

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555  

Office of Legacy Management (LM)

REGULATORY COMMISSION REGULATORY COMMISSION WASHINGTON, D. C. 20555 JAN 2 2 1982 -/ Departmznt'of Ene,rgy ATTN : Dr. William E. Mott, Director Environmental and Safety Engineering Division (EP-32) Washington, D.C. 20545 Dear Dr. Mott: Enclosed is the list of contaminated'or potentially contaminated sites that I promised to send you during our recent meeting. The sites have been broken down into the followi,ng four categories: 1. Sites with known contamination that have never been 1 icensed. 2. Formerly licensed sites with known contamination. 3. Currently licensed sites that are being decontaminated prior to decoronissioning. 4. A list of formerly licensed sites that need to be visited to determine if they have been properly decontaminated prior to decommissioning.

25

The Federal Energy Regulatory Commission's Unclassified Cyber Security Program … 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Evaluation Report Evaluation Report The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2013 OAS-M-14-01 October 2013 Department of Energy Washington, DC 20585 October 23, 2013 MEMORANDUM FOR THE EXECUTIVE DIRECTOR, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2013" BACKGROUND The Federal Energy Regulatory Commission (Commission) is an independent agency within the Department of Energy (Department) responsible for, among other things, regulating the interstate

26

The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2012, OAS-L-13-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 OAS-L-13-01 November 2012 Department of Energy Washington, DC 20585 November 7, 2012 MEMORANDUM FOR THE EXECUTIVE DIRECTOR, FEDERAL ENERGY REGULATORY COMMISSION FROM: Daniel M. Weeber Assistant Inspector General for Audits and Administration Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2012" BACKGROUND The Federal Energy Regulatory Commission (Commission) is an independent agency within the Department of Energy responsible for, among other things, regulating interstate transmission of the Nation's electricity, natural gas and oil. In addition, the Commission licenses and inspects private, municipal and state hydroelectric projects. To achieve its mission, the Commission relies

27

The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2011, OAS-M-12-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 OAS-M-12-01 November 2011 Department of Energy Washington, DC 20585 November 15, 2011 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2011" INTRODUCTION AND OBJECTIVE The Federal Energy Regulatory Commission (Commission) is an independent agency within the Department of Energy responsible for regulating the Nation's oil pipeline, natural gas, hydroelectric and wholesale electric industries. The Commission relies on a wide range of information technology (IT) resources in achieving its mission of assisting consumers in

28

Indexes to Nuclear Regulatory Commission Issuances  

SciTech Connect

Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index.

NONE

1996-12-31T23:59:59.000Z

29

Department of Energy and Nuclear Regulatory Commission Increase Cooperation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Regulatory Commission Increase Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership Department of Energy and Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership July 17, 2007 - 2:55pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) and Nuclear Regulatory Commission (NRC) expanded cooperation for President Bush's Global Nuclear Energy Partnership (GNEP) through a Memorandum of Understanding (MOU) that was signed on Friday by DOE's GNEP Deputy Program Manager Paul Lisowski and NRC Executive Director for Operations Luis Reyes. The MOU establishes the foundation for increased cooperation between DOE and NRC on technological research and engineering studies and marks another important milestone

30

Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission  

National Nuclear Security Administration (NNSA)

Federal Register Vol. 76, No. 83 Friday, April 29, 2011 Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Project No. 14147-000 Storage Development...

31

The Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit, OAS-FS-13-03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Energy Regulatory Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit OAS-FS-13-03 November 2012 Department of Energy Washington, DC 20585 November 15, 2012 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit The attached report presents the results of the independent certified public accountants' audit of the Federal Energy Regulatory Commission's (Commission) balance sheets as of September 30, 2012 and 2011, and the related statements of net costs, changes in net position, budgetary

32

Safety Culture in the US Nuclear Regulatory Commission's Reactor Oversight  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety Culture in the US Nuclear Regulatory Commission's Reactor Safety Culture in the US Nuclear Regulatory Commission's Reactor Oversight Process Safety Culture in the US Nuclear Regulatory Commission's Reactor Oversight Process September 19, 2012 Presenter: Undine Shoop, Chief, Health Physics and Human Performance Branch, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission Topics covered: Purpose of the Reactor Oversight Process (ROP) ROP Framework Safety Culture within the ROP Safety Culture Assessments Safety Culture in the US Nuclear Regulatory Commission's Reactor Oversight Process More Documents & Publications A Commissioner's Perspective on USNRC Actions in Response to the Fukushima Nuclear Accident Comparison of Integrated Safety Analysis (ISA) and Probabilistic Risk Assessment (PRA) for Fuel Cycle Facilities, 2/17/11

33

Work for Nuclear Regulatory Commission, Safety Related Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Regulatory Nuclear Regulatory Commission Capabilities Sensors and Instrumentation and Nondestructive Evaluation Overview Energy System Applications Safety-Related Applications Overview DOE Office of Nuclear Energy, Science, and Technology Nuclear Regulatory Commission National Aeronautics and Space Administration (NASA) Homeland Security Applications Biomedical Applications Millimiter Wave Group Papers Other NPNS Capabilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Sensors and Instrumentation and Nondestructive Evaluation Safety Related Applications Bookmark and Share Nuclear Regulatory Commission International Steam Generator Tube Integrity Program Key objectives of the International Steam Generator Tube Integrity Program

34

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STATES OF AMERICA STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon NOTICE OF AVAILABILITY OF ENVIRONMENTAL ASSESSMENT (December 3, 2010) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Reedsport OPT Wave Park, LLC's application for license for the Reedsport OPT Wave Park Project

35

Proceedings of the US Nuclear Regulatory Commission twentieth water reactor safety information meeting; Volume 2, Severe accident research, Thermal hydraulics  

SciTech Connect

This three-volume report contains papers presented at the Twentieth Water Reactor Safety Information Meeting held at the Bethesda Marriott Hotel, Bethesda, Maryland, during the week of October 21--23, 1992. The papers describe progress and results of programs in nuclear safety research conducted in this country and abroad. Foreign participation in the meeting included 10 different papers presented by researchersfrom CEC, China, Finland, France, Germany, Japan, Spain and Taiwan. Selected papers have been processed separately for inclusion in the Energy Science and Technology Database.

Weiss, A.J. [comp.] [Brookhaven National Lab., Upton, NY (United States)

1993-03-01T23:59:59.000Z

36

Federal Energy Regulatory Commission fiscal year 1997 annual financial statements  

Science Conference Proceedings (OSTI)

This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

NONE

1998-02-24T23:59:59.000Z

37

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FEDERAL ENERGY REGULATORY COMMISSION FEDERAL ENERGY REGULATORY COMMISSION ) Emergency Petition and Complaint of ) Docket No. EL05-145-000 District of Columbia Public Service Comm'n ) ) POTOMAC ELECTRIC POWER COMPANY'S MOTION TO INTERVENE AND COMMENT IN SUPPORT OF EMERGENCY PETITION AND COMPLAINT Pursuant to Rules 211 and 214 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission ("FERC" or the "Commission"), 18 C.F.R. §§ 385.211 and 385.214 (2004), Potomac Electric Power Company ("Pepco") hereby moves to intervene in the above-captioned proceeding and supports the August 24, 2005 Emergency Petition and Complaint filed by the District of Columbia Public Service Commission ("DC PSC"). As discussed below, Mirant Corporation and its public utility subsidiaries (collectively, "Mirant")

38

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COMMISSION COMMISSION ) In the Matter of ) July 19,2010 1 U.S. DEPARTMENT OF ENERGY 1 Docket No. 63-001-HLW 1 (High Level Waste Repository 1 Construction Authorization Application) ) ) U.S. DEPARTMENT OF ENERGY'S REPLY BRIEF IN SUPPORT OF REVIEW AND REVERSAL OF THE BOARD'S RULING ON THE MOTION TO WITHDRAW Scott Blake Harris Donald P. Irwin Sean A. Lev Michael R. Shebelskie James Bennett McRae HUNTON & WILLIAMS LLP U.S. DEPARTMENT OF ENERGY Riverfront Plaza, East Tower Office of General Counsel 95 1 East Byrd Street Department of Energy Richmond, Virginia 232 19-4074 1000 Independence Avenue, S. W. Washington, D.C. 20585 Counsel for the U.S. Department of Energy Table of Contents Page . . ........................................................................................................................ Table of Authorities

39

Energy Praises the Nuclear Regulatory Commission Approval of the First  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Praises the Nuclear Regulatory Commission Approval of the Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years March 8, 2007 - 10:28am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today commended the Nuclear Regulatory Commission's decision to approve the first-ever Early Site Permit (ESP) for the Exelon Generation Company's Clinton site, in central Illinois. This decision marks a major milestone in the President's plan to expand the use of safe and clean nuclear power. As part of President Bush's Advanced Energy Initiative - which seeks to change the way we power this nation - nuclear power will play an increasingly

40

Department of Energy Commends the Nuclear Regulatory Commission's Approval  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commends the Nuclear Regulatory Commission's Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month Department of Energy Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month March 27, 2007 - 12:10pm Addthis The Entergy Corporation's Grand Gulf Site in Mississippi Receives NRC Approval for an ESP WASHINGTON, DC - The U.S. Department of Energy (DOE) today applauded the Nuclear Regulatory Commission's (NRC) decision to approve an Early Site Permit (ESP) for the Entergy Corporation's Grand Gulf Nuclear Station in Mississippi. This approval, the second ESP this month, demonstrates another major milestone in President Bush's Advanced Energy Initiative, which plans to expand the use of safe and clean nuclear power. Earlier this

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Regulatory Commission (Commission) directs the North American Electric Reliability  

E-Print Network (OSTI)

submit to the Commission for approval proposed Reliability Standards that address the impact of geomagnetic disturbances (GMD) on the reliable operation of the Bulk-Power System. The Commission directs NERC to implement the directive in two stages. In the first stage, NERC must submit, within six months of the effective date of this Final Rule, one or more Reliability Standards that require owners and operators of the Bulk-Power System to develop and implement operational procedures to mitigate the effects of GMDs consistent with the reliable operation of the Bulk-Power System. In the second stage, NERC must submit, within 18 months of the effective date of this Final Rule, one or more Reliability Standards that require owners and operators of the Bulk-Power System to conduct initial and on-going assessments of the potential impact of benchmark GMDDocket No. RM12-22-000- 2-events on Bulk-Power System equipment and the Bulk-Power System as a whole. The Second Stage GMD Reliability Standards must identify benchmark GMD events that specify what severity GMD events a responsible entity must assess for potential impacts on the Bulk-Power System. If the assessments identify potential impacts from benchmark GMD events, the Reliability Standards should require owners and operators

Cfr Part

2013-01-01T23:59:59.000Z

42

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FEDERAL ENERGY REGULATORY COMMISSION FEDERAL ENERGY REGULATORY COMMISSION ) Emergency Petition and Complaint of ) Docket No. EL05-145-000 District of Columbia Public Service Comm'n ) ) POTOMAC ELECTRIC POWER COMPANY'S MOTION FOR LEAVE TO ANSWER AND ANSWER TO COMMENTS AND PROTESTS Pursuant to Rules 212 and 213 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission ("FERC" or the "Commission"), 18 C.F.R. §§ 385.212 and 385.213 (2005), Potomac Electric Power Company ("Pepco") hereby (i) moves for leave to answer and (ii) answers certain of the comments and protests filed in the above-captioned proceeding. 1 I. BACKGROUND 2 On August 24, 2005, Mirant 3 shut down the Potomac River generating station in Alexandria, Virginia (the "Potomac River Plant" or the "Plant") without authority from any court

43

Federal Energy Regulatory Commission's Fiscal Year 2010 Financial Statement Audit  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2010 9, 2010 REPLY TO ATTN TO: IG-34 (A10FN002) SUBJECT: Federal Energy Regulatory Commission's Fiscal Year 2010 Financial Statement Audit Report No.: OAS-FS-11-02 TO: Chairman, Federal Energy Regulatory Commission The attached report presents the results of the independent certified public accountants' audit of the Federal Energy Regulatory Commission's (Commission) Fiscal Year 2010 balance sheet and the related statements of net cost, changes in net position, budgetary resources, and custodial activity. To fulfill the Office of Inspector General's audit responsibilities, we contracted with the independent public accounting firm of KPMG LLP (KPMG) to conduct the audit, subject to our review. KPMG is responsible for expressing an opinion on the

44

Federal Energy Regulatory Commission`s fiscal year 1996 financial statement audit  

SciTech Connect

This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statement of financial position and the related statements of operations and changes in net position.

NONE

1997-02-14T23:59:59.000Z

45

Nuclear Regulatory Commission issuances, August 1987  

Science Conference Proceedings (OSTI)

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

Not Available

1987-08-01T23:59:59.000Z

46

Nuclear Regulatory Commission issuances, April 1995. Volume 41, Number 4  

SciTech Connect

This book contains issuances of the Nuclear Regulatory Commission and of the Atomic Safety and Licensing Boards, and an issuance of the Director`s decision. The issuances concern a petition filed by Dr. James E Bauer seeking interlocutory Commission review of the Atomic Safety and Licensing Board`s order imposing several restrictions on Dr. Bauer; a denial of an Interveners` Petition for Review addressing the application of Babcock and Wilcox for a renewal of its Special Nuclear Materials License; granting a motion for a protective order, by Sequoyah Fuel Corporation and General Atomics, limiting the use of the protected information to those individuals participating in the litigation and for the purposes of the litigation only; granting a Petitioner`s petition for leave to intervene and request for a hearing concerning Georgia Institute of Technology (Georgia Tech Research Reactor) renewal of a facility license; and a denial of a petition filed by Mr. Ted Dougherty requesting a shutdown of the San Onofre Nuclear Generating Station based on concerns regarding the vulnerability of the plant to earthquakes and defensibility of the plant to a terrorist threat.

NONE

1995-04-01T23:59:59.000Z

47

The Federal Energy Regulatory Commission's Fiscal Year 2011 Financial Statement Audit, OAS-FS-12-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Financial Statement Audit OAS-FS-12-01 November 2011 Department of Energy Washington, DC 20585 November 15, 2011 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Federal Energy Regulatory Commission's Fiscal Year 2011 Financial Statement Audit The attached report presents the results of the independent certified public accountants' audit of the Federal Energy Regulatory Commission (Commission) Fiscal Year 2011 balance sheet and the related statements of net cost, changes in net position, budgetary resources, and custodial activity.

48

US Nuclear Regulatory Commission organization charts and functional statements  

Science Conference Proceedings (OSTI)

This document contains organization charts for the U.S. Nuclear Regulatory Commission (NRC) and for the five offices of the NRC. Function statements are provided delineating the major responsibilities and operations of each office. Organization and function are provided to the branch level. The head of each office, division, and branch is also listed.

NONE

1997-11-01T23:59:59.000Z

49

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BEFORE THE BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Emergency Petition and Complaint of ) Docket No. EL05-145-000 District of Columbia Public Service ) Commission ) MOTION FOR LEAVE TO ANSWER AND ANSWER OF POTOMAC ELECTRIC POWER COMPANY Pursuant to Rule 213 of the Commission's Rules of Practice and Procedure, 18 C.F.R. § 385.213, Potomac Electric Power Company ("Pepco") hereby moves for leave to answer and answers the Motion for Leave to File Consolidated Answer and Consolidated Answer of Robert G. Burnley, Director of the Commonwealth of Virginia Department of Environmental Quality filed on November 10, 2005 ("VDEQ Answer"). For the reasons detailed below, Pepco requests that the Commission reject VDEQ's Answer, or in the alternative, if the

50

Federal Energy Regulatory Commission December 21, 2007  

E-Print Network (OSTI)

of the Enron Debtors ­ Enron Corp., Enron Power Marketing, Inc., Enron North America, Enron Energy Marketing marks continued progress toward resolution of the Western power market crisis of 2000-2001. Information on other settlements related to the western energy markets may be found on the FERC website at http://www

Laughlin, Robert B.

51

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I  

Office of Legacy Management (LM)

REGION I REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 194061415 Docket No. 040-07123 JUL. 19 '996 License No. SUB-748 (Retired) United States -Department of Energy O ffice of EnvironmentalRestoration ATTN: W. Alexander Williams, Ph.D. EM-241 Cloverleaf Building 19901 Germantown Road Germantown, Maryland 20874-1290 SUBJECT: NL INDUSTRIES, ALBANY, NEW YORK Dear Dr. Williams: We are aware that DOE is responsible for the former National Lead Company (NL Industries) facility near Albany, New York. During a recent review of retired AEC License No. SUB-748, we found records which provide additional information concerning the use of source material at the facility. Copies of AEC documents which describe activities at that facility are enclosed. License No. SUB-00748 authorized possession of 38,000 pounds of uranium during

52

Utah Labor Commission | Open Energy Information  

Open Energy Info (EERE)

Labor Commission Labor Commission Jump to: navigation, search Name Utah Labor Commission Address 160 East 300 South, 3rd Floor Place Salt Lake City, Utah Zip 84114-6600 Phone number (801) 530-6800 Website http://laborcommission.utah.go References Website[1] This article is a stub. You can help OpenEI by expanding it. Utah Labor Commission is an organization based in Salt Lake City, Utah. The Utah Labor Commission is the regulatory agency responsible for preserving the balance established by the legislature for protecting the health, safety, and economic well-being of employees and employers. It is a multi-division state agency directed by a Commissioner who is appointed by the Governor. The Commissioner oversees the various functions of the divisions within the Commission.

53

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Trunkline LNG Company, LLC Docket No. PF12-8-000 Trunkline LNG Export, LLC Trunkline Gas Company, LLC SUPPLEMENTAL NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED LAKE CHARLES LIQUEFACTION PROJECT AND REQUEST FOR COMMENTS ON ENVIRONMENTAL ISSUES (March 21, 2013) As previously noticed on September 14, 2012, and supplemented herein, the staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental impact statement (EIS) that will discuss the environmental impacts of the Lake Charles Liquefaction Project involving construction and operation of facilities by Trunkline LNG Company, LLC; Trunkline LNG Export, LLC; and Trunkline Gas

54

Nuclear Regulatory Commission Issuances: February 1995. Volume 41, Number 2  

SciTech Connect

This book contains an issuance of the Nuclear Regulatory Commission and a Director`s Decision. The issuance concerns consideration by the Commission of appeals from both the Initial Decision and a Reconsideration Order issued by the Presiding Officer involving two materials license amendment applications filed by the University of Missouri. The Director`s Decision from the Office of Enforcement denies petitions filed by Northeast Utilities employees requesting that accelerated enforcement action be taken against Northeast Utilities for activities concerned with NU`s fitness-for-duty program.

NONE

1995-02-01T23:59:59.000Z

55

Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Federal Register 8 Federal Register / Vol. 75, No. 9 / Thursday, January 14, 2010 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER10-507-000] ERA MA, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization January 7, 2010. This is a supplemental notice in the above-referenced proceeding of ERA MA, LLC's application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426,

56

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINAL ENVIRONMENTAL ASSESSMENT FINAL ENVIRONMENTAL ASSESSMENT (August 9, 2013) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects reviewed the Public Utility District No. 1 of Snohomish County, Washington's (Snohomish PUD) application for a 10-year license for the proposed Admiralty Inlet Pilot Tidal Project No. 12690, which would be located in Admiralty Inlet in Puget Sound, near the City of Port Townsend, in Island County, Washington, and has prepared a final environmental assessment (FEA) in cooperation with the U.S. Department of Energy (DOE/EA-1949). In the FEA, Commission staff analyzed the potential environmental effects of

57

Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

33 Federal Register 33 Federal Register / Vol. 76, No. 180 / Friday, September 16, 2011 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM98-1-000] Records Governing Off-the Record Communications Public Notice This constitutes notice, in accordance with 18 CFR 385.2201(b), of the receipt of prohibited and exempt off-the-record communications. Order No. 607 (64 FR 51222, September 22, 1999) requires Commission decisional employees, who make or receive a prohibited or exempt off-the-record communication relevant to the merits of a contested proceeding, to deliver to the Secretary of the Commission, a copy of the communication, if written, or a summary of the substance of any oral communication. Prohibited communications are included in a public, non-decisional file

58

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT (January 15, 2013) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects reviewed the Public Utility District No. 1 of Snohomish County, Washington's (Snohomish PUD) application for a 10-year pilot license for the proposed Admiralty Inlet Tidal Project No. 12690, which would be located in Admiralty Inlet in Puget Sound, near the City of Port Townsend, in Island County, Washington, and has prepared an environmental assessment (EA) in cooperation with the U.S. Department of Energy (DOE/EA-1949). In the EA, Commission staff analyzed the potential environmental effects of constructing and

59

AGENCY: Federal Energy Regulatory Commission. ACTION: Final Rule.  

E-Print Network (OSTI)

SUMMARY: The Federal Energy Regulatory Commission (Commission) is amending its regulations in accordance with section 311(d) of the Energy Policy Act of 2005 (EPAct 2005) to establish mandatory procedures requiring prospective applicants to begin the Commissions pre-filing review process at least six months prior to filing an application for authorization to site and construct a liquefied natural gas (LNG) terminal. Section 311(d) of EPAct 2005, enacted on August 8, 2005, directs the Commission to promulgate such regulations within 60 days after enactment of EPAct 2005. The regulations mandatory procedures are designed to encourage applicants for LNG terminal siting and construction authority to cooperate with state and local officials, as required by EPAct 2005. The regulations also make the pre-filing process mandatory for prospective applicants for authority to construct related jurisdictional pipeline and other natural gas facilities, as defined in the regulations. The regulations also require a prospective applicant to comply with the pre-filing procedures prior to filing an application to make modifications to an existing or authorized LNG terminalDocket No. RM05-31-000-- 2--if such modifications involve significant state and local safety considerations that have

Richard Hoffmann; John Leiss; Whit Holden

2005-01-01T23:59:59.000Z

60

Notices ELECTION ASSISTANCE COMMISSION Agency Information Collection  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23 Federal Register 23 Federal Register / Vol. 76, No. 180 / Friday, September 16, 2011 / Notices ELECTION ASSISTANCE COMMISSION Agency Information Collection Activities: Proposed Collection; Comment Request; Election Assistance Commission's Voting System Test Laboratory Program Manual, Version 1.0 AGENCY: U.S. Election Assistance Commission (EAC). ACTION: Notice; comment request. SUMMARY: As part of its continuing effort to reduce paperwork and respondent burden in accordance with the Paperwork Reduction Act of 1995, the U.S. Election Assistance Commission (EAC) invites the general public and other Federal agencies to take this opportunity to comment on EAC's request to renew an existing information collection, EAC's Voting System Test Laboratory Program Manual, Version

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

National Energy Commission (China) | Open Energy Information  

Open Energy Info (EERE)

China) China) Jump to: navigation, search Name National Energy Commission (China) Place Beijing References National Energy Commission (China)[1] No information has been entered for this organization. Add Organization This article is a stub. You can help OpenEI by expanding it. National Energy Commission (China) is a new, high level, 21 member interagency commission based in Beijing, China, and is responsible for China's new energy law (expected 1/1/2011). [2] National Development and Reform Commission, Ministry of Environmental Protection (China) See also Government_policy_and_investment_in_clean_energy_(China) Key Facts Members Li Junfeng, National Development and Reform Commission ____, People's Liberation Army References ↑ "National Energy Commission (China)"

62

European Commission | Open Energy Information  

Open Energy Info (EERE)

Commission Commission Name European Commission Place Brussels, Belgium Website http://ec.europa.eu/index_en.h Coordinates 50.8503396°, 4.3517103° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.8503396,"lon":4.3517103,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

63

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ocean Renewable Power Company Maine, LLC Project No. 12711-005 Ocean Renewable Power Company Maine, LLC Project No. 12711-005 NOTICE OF AVAILABILITY OF ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED COBSCOOK BAY TIDAL ENERGY PROJECT (January 4, 2012) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Ocean Renewable Power Company, LLC's application for an 8-year pilot license for the proposed Cobscook Bay Tidal Energy Project (FERC Project No. 12711-005), which would be located in Cobscook Bay in Washington County, Maine, and has prepared an environmental assessment (EA) in cooperation with the U.S. Department of Energy

64

Nuclear Regulatory Commission issuances, May 1993. Volume 37, No. 5  

SciTech Connect

This report contains the issuances received during the specified period (May 1993) from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not deemed a part of these opinions or have any independent legal significance. Contents of this document include an Issuance of the Nuclear Regulatory Commission with respect to the Sacramento Municipal Utility District and Issuances of Directors` Decisions concerning the Interstate Nuclear Service Corporation; Niagara Mohawk Power Corporation; and Texas Utilities Electric Company, et al. and All Nuclear Power Plants with Thermo-Lag Fire Barriers.

Not Available

1993-05-01T23:59:59.000Z

65

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cameron LNG, LLC and Cameron LNG, LLC and Docket Nos. CP13-25-000 Cameron Interstate, LLC CP13-27-000 NOTICE OF AVAILABILITY OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED CAMERON LIQUEFACTION PROJECT (January 10, 2014) The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a draft environmental impact statement (EIS) for the Cameron Liquefaction Project (Project), proposed by Cameron LNG, LLC and Cameron Interstate Pipeline, LLC (collectively Cameron) in the above-referenced docket. Cameron requests authorization to export 12 million tons of liquefied natural gas (LNG) per year from its terminal in Cameron and Calcasieu Parishes, Louisiana. The draft EIS assesses the potential environmental effects of the construction and

66

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reedsport OPT Wave Park, LLC Project No. 12713-002 Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon NOTICE OF AVAILABILITY OF ENVIRONMENTAL ASSESSMENT (December 3, 2010) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Reedsport OPT Wave Park, LLC's application for license for the Reedsport OPT Wave Park Project (FERC Project No. 12713-002), which would be located in Oregon State territorial waters about 2.5 nautical miles off the coast near Reedsport, in Douglas County, Oregon. Staff prepared an environmental assessment (EA), which analyzes the potential environmental effects of licensing the project and concludes that licensing the project,

67

Nuclear Regulatory Commission's Integrated Strategy for Spent Fuel Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NRC's NRC's Integrated Strategy for NRC s Integrated Strategy for Spent Fuel Management Earl Easton 1 U.S. Nuclear Regulatory Commission May 25, 2010 Road to Yucca Mountain * 20+ years of preparation for the licensing i review * DOE application received in June 2008 and accepted for review in September 2008 * President Obama pursues alternatives to Yucca Mountain * DOE motion to withdraw in March 2010 2 * DOE motion to withdraw in March 2010 * Blue Ribbon Commission on America's Nuclear Future 2 Growing Spent Fuel Inventory Cumulative Used Nuclear Fuel Scenarios 50,000 100,000 150,000 200,000 250,000 Metric Tons 3 - 50,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Year Reference: Crozat, March 2010 Integrated Strategy * In response to the evolving national debate on spent fuel management strategy, NRC initiated a number of actions:

68

Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory Commission  

Office of Legacy Management (LM)

111989 111989 Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia. Pennsylvania 19406 Dear Mr. Kinneman: -;' .-. 'W Enclosed are the copfes of the final ORNL survey reports on the radiologlcal Surveys conducted on three Teterboro, New Jersey properties; Metpath Incorporated, Allied Aerospace Corporatio; and Sumftomo Machinery Corporation. Copies of these reports have &en sent directly to the owners by our survey contractor Oak Ridge National Laboratory. If you have any questions regardfng these reports. please call me at (301) 353-5439. Sfncerely, Enclosure : < I j i Andrew Wallo III, Designation and Certffication Manager Dfvisfon 01 Facility and Site Oeconanlssionfng Projects

69

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

NLE Websites -- All DOE Office Websites (Extended Search)

4 FERC ¶ 62,213 4 FERC ¶ 62,213 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION United States Department of Energy Docket No. EF13-5-000 Western Area Power Administration Washoe Project, Stampede Division ORDER CONFIRMING AND APPROVING RATE SCHEDULE ON A FINAL BASIS ( September 5, 2013 ) Summary: On April 24, 2013, the Deputy Secretary of Energy (Deputy Secretary) filed a request for final confirmation and approval of Western Area Power Administration's (Western) Rate Schedule SNF-7, for a non-firm power formula rate applicable to the Washoe Project, Stampede Division (Washoe Project). 1 The Deputy Secretary placed the rates into effect on an interim basis effective August 1, 2013, 2 and requests final confirmation and approval of the rates for the period

70

Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18 Federal Register 18 Federal Register / Vol. 76, No. 83 / Friday, April 29, 2011 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14147-000] Storage Development Partners, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On April 1, 2011, Storage Development Partners, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Camp Pendleton Project (project) to be located at Camp Pendleton Marine Corps Base, in San Diego County, California. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application

71

Proceedings of the US Nuclear Regulatory Commission fifteenth water reactor safety information meeting: Volume 6, Decontamination and decommissioning, accident management, TMI-2  

SciTech Connect

This six-volume report contains 140 papers out of the 164 that were presented at the Fifteenth Water Reactor Safety Information Meeting held at the National Bureau of Standards, Gaithersburg, Maryland, during the week of October 26-29, 1987. The papers are printed in the order of their presentation in each session and describe progress and results of programs in nuclear safety research conducted in this country and abroad. This report, Volume 6, discusses decontamination and decommissioning, accident management, and the Three Mile Island-2 reactor accident. Thirteen reports have been cataloged separately.

Weiss, A. J. [comp.

1988-02-01T23:59:59.000Z

72

Colorado Ground Water Commission | Open Energy Information  

Open Energy Info (EERE)

Water Commission Jump to: navigation, search Name Colorado Ground Water Commission Place Colorado Website http:water.state.co.usgroun References Colorado Ground Water Commission...

73

Report to Congress:Impacts of the Federal Energy Regulatory Commission's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report to Congress:Impacts of the Federal Energy Regulatory Report to Congress:Impacts of the Federal Energy Regulatory Commission's Proposal for Standard Market Design Report to Congress:Impacts of the Federal Energy Regulatory Commission's Proposal for Standard Market Design A report on an independent study to assess various potential impacts of the proposed rulemaking by the Federal Energy Regulatory Commission (FERC), "Remedying Undue Discrimination through Open Access Transmission Service and Standard Electricity Market Design." Report to Congress:Impacts of the Federal Energy Regulatory Commission's Proposal for Standard Market Design More Documents & Publications Electric System Decision Making in Other Regions: A Preliminary Analysis Prepared for Western Interstate Energy Board Committee on Regional Electric

74

AGENCY: Federal Energy Regulatory Commission. ACTION: Order Granting Clarification  

E-Print Network (OSTI)

SUMMARY: In this Order Granting Clarification, the Commission addresses pending requests to clarify Form No. 552, under which natural gas market participants must annually report information regarding physical natural gas transactions that use an index or that contribute to or may contribute to the formation of a gas index. Order No. 704 required market participants to file these reports in order to provide greater transparency concerning the use of indices to price natural gas and how well index prices reflect market forces. Order No. 704-C revises Form No. 552 so as to (1) exempt from reporting any unexercised options to take gas under a take-or-release contract; (2) clarify the definition of exempt unprocessed natural gas transactions as those involving gas that is both not yet processed (to separate and recover natural gas liquids), and still upstream of a processing facility; (3) exempt from reporting cash-out and imbalance transactions, since they were burdensome to report and provided little market information; (4) strike the forms references to the blanket sales certificates issued under 284.402 or 284.284, sinceDocket No. RM07-10-002- 2-they were burdensome to report and provided little market information, so as to also

unknown authors

2010-01-01T23:59:59.000Z

75

Nuclear Regulatory Commission issuances, December 1993. Volume 38, No. 6  

Science Conference Proceedings (OSTI)

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

Not Available

1993-12-31T23:59:59.000Z

76

Nuclear Regulatory Commission issuances, February 1996: Volume 43, No. 2  

SciTech Connect

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

NONE

1996-02-01T23:59:59.000Z

77

Nuclear Regulatory Commission issuances, April 1994. Volume 39, No. 4  

SciTech Connect

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

Not Available

1994-04-01T23:59:59.000Z

78

Nuclear Regulatory Commission issuances, March 1995. Volume 41, No. 3  

SciTech Connect

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

1995-06-01T23:59:59.000Z

79

Nuclear Regulatory Commission issuances. Volume 42, No. 4  

SciTech Connect

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

NONE

1995-10-01T23:59:59.000Z

80

Nuclear Regulatory Commission issuances. Volume 43, No. 1, January 1996  

Science Conference Proceedings (OSTI)

This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

NONE

1996-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Nuclear Regulatory Commission issuances. Volume 47, Number 3  

SciTech Connect

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The two issuances included here are: (1) the Commission issuance to the US Enrichment Corporation and (2) the Director`s Decision to the North Atlantic Energy Service Corporation.

NONE

1998-03-01T23:59:59.000Z

82

The U.S. Department of Energy and the Federal Energy Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy and the Federal Energy Regulatory U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a required "Implementation Proposal for The National Action Plan on Demand Response." The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a required "Implementation Proposal for The National Action Plan on Demand Response." August 1, 2011 - 1:59pm Addthis The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a required "Implementation Proposal for The National Action Plan on Demand Response." Addthis Related Articles Implementation Proposal for The National Action Plan on Demand Response DOE and FERC Joint Public Statement on Back Stop Siting

83

Indexes to Nuclear Regulatory Commission issuances, January--March 1996  

SciTech Connect

This publication is the 1st quarter 1996 index to issuances by the US NRC. These include issuances by the Commission, the Atomic Safety and Licensing Board Panel, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking.

NONE

1996-07-01T23:59:59.000Z

84

Nuclear Regulatory Commission issuances: June 1995. Volume 41, Number 6  

Science Conference Proceedings (OSTI)

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decision on Petitions for Rulemaking (DPRM). This report contains four issuances by the CLI, 5 issuances by the LBP, and 1 issuance by the DD.

NONE

1995-06-01T23:59:59.000Z

85

Nuclear Regulatory Commission issuances, Volume 45, No. 5  

SciTech Connect

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

NONE

1997-05-01T23:59:59.000Z

86

Nuclear Regulatory Commission issuances. Volume 46, Number 1  

SciTech Connect

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

NONE

1997-07-01T23:59:59.000Z

87

Nuclear Regulatory Commission Issuances. Volume 45, No. 3  

Science Conference Proceedings (OSTI)

This report includes the issuances received in March 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. 10 issuances were received: Louisiana Energy Services (2 issuances); Illinois Power Company and Soyland Power Cooperative; Ralph. L. Tetrick; University of Cincinnati; Consumers Power Company; Entergy Operations, Inc.; Georgia Power Company; Westinghouse Electric Corporation; and Wisconsin Electric Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

NONE

1997-03-01T23:59:59.000Z

88

Nuclear Regulatory Commission Issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders: July 1, 1992--December 31, 1992, Volume 36, Pages 1--396  

SciTech Connect

This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967.

Not Available

1992-12-31T23:59:59.000Z

89

Nuclear Regulatory Commission issuances: Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1--December 31, 1996. Volume 44, Pages 1--432  

SciTech Connect

The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. Issuances are referred to as follows: Commission--CLI, Atomic Safety and Licensing Boards--LBP, Administrative Law Judges--ALJ, Directors` Decisions--DD, and Decisions on Petitions for Rulemaking--DPRM.

1997-10-01T23:59:59.000Z

90

U.S. Nuclear Regulatory Commission Certifies HalfPACT Transportation Container  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Nuclear Regulatory Commission Certifies U.S. Nuclear Regulatory Commission Certifies HalfPACT Transportation Container CARLSBAD, N.M., November 20, 2000 - The U.S. Nuclear Regulatory Commission (NRC) issued a Certificate of Compliance November 2 for the HalfPACT transportation container. The HalfPACT will be used to supplement the Transuranic Package Transporter Model 2 (TRUPACT-II) for transportation of waste to the Waste Isolation Pilot Plant. The TRUPACT-II is currently used for transportation of waste to the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP). The new container is approximately 30 inches shorter than the TRUPACT-II. The HalfPACT is designed to carry seven 55-gallon drums weighing up to 1,000 pounds each, but is also capable of carrying one standard waste box or four 85-gallon drums.

91

File:Federal Hydropower - Federal Energy Regulatory Commission.pdf | Open  

Open Energy Info (EERE)

Federal Hydropower - Federal Energy Regulatory Commission.pdf Federal Hydropower - Federal Energy Regulatory Commission.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - Federal Energy Regulatory Commission.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 740 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:32, 22 May 2013 Thumbnail for version as of 15:32, 22 May 2013 1,275 × 1,650, 2 pages (740 KB) Graham7781 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup

92

Nevada Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Page Edit History Facebook icon Twitter icon Nevada Public Utilities Commission Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleNevadaPublic...

93

Federal Energy Regulatory Commission financial statements, September 30, 1995 and 1994  

SciTech Connect

The attached report presents the results of the independent certified public accountant`s audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1995 and 1994. The auditors have expressed an unqualified opinion on the 1995 statements. Their reports on FERC`s internal control structure and on compliance with laws and regulations, and management letter are also provided.

NONE

1996-02-12T23:59:59.000Z

94

Nuclear Regulatory Commission issuances, June 1996. Volume 43, Number 6  

Science Conference Proceedings (OSTI)

This report covers the issuances received during the specified period form the Commission, the Atomic Safety and licensing Boards, the administrative Law Judges, the Director`s decisions and the Decisions on Petitions for Rulemaking. Included are a memorandum and order on the decommissioning plan for Yankee Nuclear Power Station, a memorandum and order suspending byproduct material license for Eastern Testing and Inspection, Inc., an initial decision of the source materials license for Sequoyah Fuels Corporation, Director`s decisions for Palo Verde Nuclear Generating Station, Indian Point, Peach Bottom Atomic Power Station, Trojan Nuclear Plant, Rancho Seco Nuclear Generating Station, San Onofre Nuclear Generating Station, and Yankee Nuclear Power Station.

NONE

1996-06-01T23:59:59.000Z

95

Nuclear Regulatory Commission Issuances, Volume 44, No. 5  

Science Conference Proceedings (OSTI)

This report includes the issuances received in November 1996. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. Seven issuances were received and are abstracted individually in the database: Emerick S. McDaniel, U.S. Enrichment Corporation, Sequoyah Fuels Corporation and General Atomics, all power reactor licensees, Florida Power and Light Company, Maine Yankee Atomic Power Company, and Northern States Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

NONE

1996-11-01T23:59:59.000Z

96

Nuclear Regulatory Commission issuances, Volume 44, No. 4  

SciTech Connect

This report includes the issuances received in October 1996. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. 15 issuances were received and are abstracted individually in the database: Louisiana Energy Services, U.S. Enrichment Corporation, Yankee Atomic Electric Company, General Public Utilities Nuclear Corporation, James L. Shelton, Juan Guzman, Northern States Power Company, TESTCO Inc., Washington Public Power Supply System, all nuclear plants, Cleveland Electric Illuminating Company, Duke Power Company, Florida Power Corporation, and Northeast Nuclear Energy Company (2 issuances). No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

NONE

1996-10-01T23:59:59.000Z

97

Nuclear Regulatory Commission Issuances, Volume 42, No. 2  

Science Conference Proceedings (OSTI)

This report include the issuances received during the specificed period (August 1995) from the NRC, the Atomic Safety and Licensing Boards, the Administrative Law Judges, and the Decisions on Petitions for Rule Making. In these issuances, the following areas were addressed: (1) Emergency planning at the University of Missouri, (2) Transfer of operating license at Plant Vogtle, (3) Discriminatory action against a whistle-blower at Millstone Units 1 & 2, (4) Regulatory issues related to embittlement and cracking at Oyster Creek, and (5) Age-related deterioration of reactor internals components at Pilgrim.

NONE

1995-08-01T23:59:59.000Z

98

Texas Historical Commission | Open Energy Information  

Open Energy Info (EERE)

Historical Commission Historical Commission Jump to: navigation, search Logo: Texas Historical Commission Name Texas Historical Commission Address 1511 Colorado St. Place Austin, Texas Zip 78701 Year founded 1953 Phone number 512.463.6100 Website http://www.thc.state.tx.us/ Coordinates 30.2779484°, -97.7403973° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.2779484,"lon":-97.7403973,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

99

Nevada State Environmental Commission | Open Energy Information  

Open Energy Info (EERE)

Environmental Commission Environmental Commission Jump to: navigation, search Logo: Nevada State Environmental Commission Name Nevada State Environmental Commission Address 901 South Stewart Street, Suite 4001 Place Carson City, Nevada Zip 89701 Website http://www.sec.nv.gov/ Coordinates 39.1580849°, -119.7644949° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.1580849,"lon":-119.7644949,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

100

Audit of the Federal Energy Regulatory Commission Leased Warehouse Space, CR-B-96-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIT OF THE FEDERAL ENERGY REGULATORY COMMISSION LEASED WAREHOUSE SPACE The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet 5 to 7 days after publication at the following alternative addresses:

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Regulatory Impact Review Implementation of Inter-American Tropical Tuna Commission Resolutions Adopted in  

E-Print Network (OSTI)

Regulatory Impact Review Implementation of Inter-American Tropical Tuna Commission Resolutions to implement the decisions of the IATTC. The Tuna Conventions Act (16 U.S.C. 951-961) authorizes the Secretary the Resolution on Tuna Conservation 2011-2013 (C-11-01), the Resolution Prohibiting Fishing on Data Buoys (C-11

102

Nuclear Regulatory Commission issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1994--December 31, 1994. Volume 40, Pages 1--387  

SciTech Connect

The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. This book covers the following: issuances of the NRC; issuances of the Atomic Safety and Licensing Boards; and issuances of Directors` decisions.

NONE

1994-12-31T23:59:59.000Z

103

California State Lands Commission | Open Energy Information  

Open Energy Info (EERE)

Lands Commission Lands Commission Jump to: navigation, search Name California State Lands Commission Address 100 Howe Ave., Suite 100 South Place Sacramento, California Zip 95825-8282 Phone number 916-574-1900 Website http://www.slc.ca.gov/ Coordinates 38.5653989°, -121.4075812° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.5653989,"lon":-121.4075812,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

104

Illinois Commerce Commission | Open Energy Information  

Open Energy Info (EERE)

Commerce Commission Commerce Commission Jump to: navigation, search Name Illinois Commerce Commission Place Springfield, Illinois Zip 62701 Product Regulator of public utilities and transportation in Illinois. Coordinates 42.640925°, -88.413644° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.640925,"lon":-88.413644,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

105

Utah Public Service Commission | Open Energy Information  

Open Energy Info (EERE)

Utah Public Service Commission Utah Public Service Commission Name Utah Public Service Commission Address 160 East 300 South Place Salt Lake City, Utah Zip 84114 Phone number 801.530.6716 Website http://www.psc.utah.gov/index. Coordinates 40.7627771°, -111.8866213° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.7627771,"lon":-111.8866213,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

106

California Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Public Utilities Commission Public Utilities Commission Address 505 Van Ness Avenue Place San Francisco, California Zip 94102 Phone number 415-703-2782 Website http://www.cpuc.ca.gov/puc/ References CPUC Website[1] This article is a stub. You can help OpenEI by expanding it. California Public Utilities Commission is an organization based in San Francisco, California. The CPUC regulates privately owned electric, natural gas, telecommunications, water, railroad, rail transit, and passenger transportation companies, in addition to authorizing video franchises. Our five Governor-appointed Commissioners, as well as our staff, are dedicated to ensuring that consumers have safe, reliable utility service at reasonable rates, protecting against fraud, and promoting the health of California's economy.

107

Michigan Public Service Commission | Open Energy Information  

Open Energy Info (EERE)

Commission Commission Jump to: navigation, search State Michigan Name Michigan Public Service Commission Address 6545 Mercantile Way, Suite 7 City, State Lansing, MI Zip 48911 Website http://www.michigan.gov/mpsc/ Coordinates 42.663692°, -84.535225° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.663692,"lon":-84.535225,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

108

Idaho Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Commission Commission Jump to: navigation, search Name Idaho Public Utilities Commission Address P.O. Box 83720 Place Boise, ID Zip 83720 Website http://www.puc.idaho.gov Coordinates 43.6175293°, -116.2003704° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.6175293,"lon":-116.2003704,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

109

Hawaii Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Public Utilities Commission Public Utilities Commission Jump to: navigation, search Name Hawaii Public Utility Commission Address 465 South King Street #103 Place Honolulu, Hawaii Zip 96813 Coordinates 21.3053513°, -157.85857° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":21.3053513,"lon":-157.85857,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

110

Oregon Public Utility Commission | Open Energy Information  

Open Energy Info (EERE)

Commission Commission Jump to: navigation, search Name Oregon Public Utility Commission Address 550 Capitol Street N.E. Suite 215 Place Salem, Oregon Zip 97301-2551 Number of employees 51-200 Phone number 503-373-7394 Website http://www.oregon.gov/PUC/Page Coordinates 44.941989°, -123.025697° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.941989,"lon":-123.025697,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

111

U.S. Nuclear Regulatory Commission accountability report, fiscal year 1995. Volume 1  

SciTech Connect

The US Nuclear Regulatory Commission (NRC) is one of six Federal agencies participating in a pilot project to streamline financial management reporting. The goal of this pilot is to consolidate performance-related reporting into a single accountability report. The project, which is being carried out under the guidance of the Chief Financial Officers Council, was undertaken in accordance with the Government Management Reform Act (GMRA) of 1994. The GMRA permits the streamlining of financial management reports in consultation with the appropriate Congressional Committees through a liaison in the US Office of Management and Budget (OMB). The results of the pilot project will determine the method to be used for reporting financial management information for fiscal year (FY) 1996. This report consolidates the information previously reported in the following documents: (1) the NRC`s annual financial statement required by the Chief Financial Officers Act of 1990; (2) the Chairman`s annual report to the President and the Congress, required by the Federal Managers` Financial Integrity Act of 1982; (3) the Chairman`s semiannual report to the Congress on management decisions and final actions on Office of Inspector General audit recommendations, required by the Inspector General Act of 1978, as amended. This report also includes performance measures, as required by the Chief Financial Officers Act of 1990.

1996-05-01T23:59:59.000Z

112

Indexes to Nuclear Regulatory Commission issuances, July--December 1995  

Science Conference Proceedings (OSTI)

Digests and indexes for issuances of the NRC, the Atomic Safety and Licensing Board, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: (1) case name, (2) full text reference, (3) issuance number, (4) issued raised by appellants, (5) legal citations, (6) name of facility and Docket number, (7) subject matter, (8) type of hearing, and (9) type of issuance.

NONE

1996-04-01T23:59:59.000Z

113

Nuclear Regulatory Commission issuances. Volume 44, Number 3  

Science Conference Proceedings (OSTI)

This report includes issuances received during September 1996. After reviewing in detail each of the claims made in this informal proceeding the presiding officer sustained the staff of the USNRC in its determination that the applicant did not pass the written portion of his examination to become a licensed operator of a nuclear power plant. In the proceeding concerning citizen group challenges to the decommissioning plan for the Rowe Yankee power station, the licensing board grants licensee Yankee Atomic Electric Company`s motion for summary disposition.

NONE

1996-09-01T23:59:59.000Z

114

U.S. Nuclear Regulatory Commission Attn: Document Control Desk  

E-Print Network (OSTI)

Blade Interference Customer Guidance. In that letter GEH stated that: This determination does not apply to BWR/6 or ABWR plants or the ABWR/ESBWR Design Control Documents (DCD). Subsequent to the issuance of the reference letter, the NRC requested additional information as to the basis of this statement with regard to the applicability of this issue to the ABWR/ESBWR Design Control Documents (DCD). The following provides supporting information to address the basis for this statement: Both the ABWR and ESBWR reactivity control systems incorporate a Fine Motion Control Rod Drive (FMCRD) that is different than the Control Rod Drives supplied to the BWR/2-6. The scram pressure source is independent of RPV pressure thus the issues presented in the September 26, 2011 communication are not applicable to the ABWR or ESBWR design. The FMCRD provides hydraulicpowered rapid insertion (scram) of control rods during normal and abnormal operating conditions. The hydraulic power required for scram is provided by high pressure water stored in the individual Hydraulic Control Units (HCUs). Each HCU contains a scram accumulator charged to high pressure and the necessary valves and components to scram two FMCRDs. Upon scram valve actuation, high

Dale E. Porter; Castle Hayne Rd

2011-01-01T23:59:59.000Z

115

California Coastal Commission | Open Energy Information  

Open Energy Info (EERE)

Logo: California Coastal Commission Name California Coastal Commission Address 45 Fremont Street, Suite 2000 Place San Francisco, California Zip 94105-2219 Phone number 415-904-5400 Website http://www.coastal.ca.gov/ Coordinates 37.7912419°, -122.397133° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.7912419,"lon":-122.397133,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

116

Colorado Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Public Utilities Commission Public Utilities Commission Address 1560 Broadway, Suite 250 Place Denver, Colorado Zip 80202 Phone number (303) 894-2000 Coordinates 39.7415017°, -104.9866578° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.7415017,"lon":-104.9866578,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

117

California Energy Commission | Open Energy Information  

Open Energy Info (EERE)

Energy Commission Energy Commission Address 1516 Ninth Street, MS-29 Place Sacramento, CA Zip 95814-5512 Website http://www.energy.ca.gov Coordinates 40.97989806962°, -94.21875° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.97989806962,"lon":-94.21875,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

118

Railroad Commission of Texas | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search Logo: Railroad Commission of Texas Name Railroad Commission of Texas Address 1701 N. Congress Place Austin, Texas Zip 78701 Year founded 1891 Phone number (512) 463-7158 Website http://www.rrc.state.tx.us/ Coordinates 30.2790636°, -97.7382267° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.2790636,"lon":-97.7382267,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

119

Oregon Environmental Quality Commission | Open Energy Information  

Open Energy Info (EERE)

Oregon Environmental Quality Commission Oregon Environmental Quality Commission Address 811 SW 6th Avenue Place Portland, Oregon Zip 97204-1390 Phone number 503-229-5301 Website http://www.oregon.gov/DEQ/EQC/ Coordinates 45.5182053°, -122.6790735° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.5182053,"lon":-122.6790735,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

120

Technical Analysis of the Federal Energy Regulatory Commission Order on Smart Grid Interoperability Standards  

Science Conference Proceedings (OSTI)

As specified in the Energy Independence and Security Act of 2007, the National Institute of Standards and Technology (NIST) is required to post smart grid interoperability standards for consideration by the Federal Energy Regulatory Commission (FERC). FERC is to determine if there is sufficient consensus for the standards to be adopted. A FERC technical conference was held on January 31, 2011, to review the five families of standards that were posted by NIST, and following the technical conference, comme...

2011-10-26T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Report to the Nuclear Regulatory Commission from the staff panel on the Commission's determination of an Extraordinary Nuclear Occurrence (ENO)  

SciTech Connect

The Panel finds that the first criterion, pertaining to whether the accident caused a discharge of radioactive material or levels of radiation offsite as defined in 10 CFR 140.84, has not been met. It further finds that there is presently insufficient information to support any definitive finding as to whether or not the second criterion, relating to damage to persons or property offsite as defined in 10 CFR 140.85, has been met. Since the Panel has not found that both criteria have been met, it recommends that the Commission determine that the accident at Three Mile Island did not constitute an extraordinary nuclear occurrence.

none,

1980-01-01T23:59:59.000Z

122

Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Carl Wharton; Kent Norris

2009-12-01T23:59:59.000Z

123

Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

Science Conference Proceedings (OSTI)

This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Carl Wharton; Kent Norris

2010-03-01T23:59:59.000Z

124

Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Carl Wharton

2009-10-01T23:59:59.000Z

125

Updates to the U.S. Nuclear Regulatory Commission's Consolidated NMSS Decommissioning Guidance  

Science Conference Proceedings (OSTI)

In September 2003, U.S. Nuclear Regulatory Commission (NRC) staff in the Office of Nuclear Material Safety and Safeguards (NMSS) consolidated and updated the policies and guidance of its decommissioning program in a three-volume NUREG report, NUREG-1757, 'Consolidated NMSS Decommissioning Guidance' [1,2,3]. This NUREG report provides guidance on: planning and implementing license termination under the NRC's License Termination Rule (LTR), in 10 CFR Part 20, Subpart E; complying with the radiological criteria for license termination; and complying with the requirements for financial assurance and record-keeping for decommissioning and timeliness in decommissioning of materials facilities. The staff plans to periodically update NUREG-1757, so that it reflects current NRC decommissioning policy. In September 2005, the staff issued, for public comment, draft Supplement 1 to NUREG-1757 [4], which contains proposed updates to the three volumes of NUREG-1757. Draft Supplement 1 includes new and revised decommissioning guidance that addresses some of the LTR implementation issues, which were analyzed by the staff in two Commission papers (SECY-03-0069, Results of the LTR Analysis [5]; and SECY-04-0035, Results of the LTR Analysis of the Use of Intentional Mixing of Contaminated Soil [6]). These issues include restricted use and institutional controls, onsite disposal of radioactive materials under 10 CFR 20.2002, selection and justification of exposure scenarios based on reasonably foreseeable future land use (realistic scenarios), intentional mixing of contaminated soil, and removal of material after license termination (a follow-up to the LTR Analysis issue on the relationship between the LTR and the current case-by-case approach for release of solid materials). The staff also developed new and revised guidance on other issues, including the risk-informed graded approach for engineered barriers. This paper is a follow-up to a poster session and paper at Waste Management 2004, which presented the new Consolidated NMSS Decommissioning Guidance in NUREG-1757. This paper discusses the issues addressed in the current update to NRC's decommissioning guidance and explores the relationships between the issues. (authors)

Banovac, K.L.; Johnson, R.L.; Schmidt, D.W. [U.S. Nuclear Regulatory Commission, Washington, DC 20555 (United States)

2006-07-01T23:59:59.000Z

126

European Commission Impact Assessment Tools | Open Energy Information  

Open Energy Info (EERE)

European Commission Impact Assessment Tools European Commission Impact Assessment Tools Jump to: navigation, search Tool Summary Name: IPTS-IA Tools Agency/Company /Organization: European Commission Joint Research Centre Sector: Energy Topics: Co-benefits assessment Resource Type: Guide/manual, Publications, Software/modeling tools User Interface: Other Website: iatools.jrc.ec.europa.eu/bin/view/IQTool/WebHome.html IPTS-IA Tools Screenshot References: IPTS-IA Tools[1] Overview "IA TOOLS is an online platform that provides Commission policy actors and impact assessment practitioners throughout Europe with a repository of guidance, information and best practices for the impact assessment of new policies and legislative measures. At one click, the IA TOOLS website provides expert and non-expert with guidance on the main steps to be

127

Transportation Security Rulemaking Activities at the U.S. Nuclear Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AT THE AT THE U.S. NUCLEAR REGULATORY COMMISSION R. Clyde Ragland, P.E. Office of Nuclear Security and Incident Response 2011 DOE National Transportation Stakeholders Forum May 11, 2011 2 NRC Focus Prior to September 11, 2001 * Historically, NRC Transportation Security Regulations Focused on Highest Risk Radioactive Material, consisted of Special Nuclear Material (SNM) and Spent Nuclear Fuel (SNF) NRC Actions Since September 11, 2001 * Domestically, reviewed materials transported by NRC licensees and re- evaluated security requirements considering: - applicable threats to shipments - material considerations - magnitude of adverse consequences * Internationally, participated in the development of the IAEA Code of Conduct on the Safety and Security of Radioactive

128

Licensing Assistance team U.S. Nuclear Regulatory Commission, Region 1  

E-Print Network (OSTI)

Division of Nuclear Materials Safety 09 / z-4 (p7- 317,7p-4) The enclosed application for Material License and one copy is being submitted for the purpose of obtaining a specific license from the United States Nuclear Regulatory Commission to obtain two cross belt analyzers. The analyzers would be utilized at the Appalachian Power Companys John E. Amos Plant in West Virginia. The Appalachian Power Company and the John E. Amos Plant are included in American Electric Power. If I can be of any further assistance please give me a call at my office telephone number

John E. Amos Plant; R. T. Carroll F; Cc Greg; Massey John; E. Amos Plant; Joe Beer; Corporate Radiation; Safety Officer Donald; C. Cook Plant

2007-01-01T23:59:59.000Z

129

The United States Nuclear Regulatory Commission and the United States Department Of Energy Public Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 The UNITED STATES 3 NUCLEAR REGULATORY COMMISSION and 4 the UNITED STATES 5 DEPARTMENT OF ENERGY 6 7 PUBLIC MEETING 8 9 DISCUSSION OF THE IMPLEMENTATION OF SECTION 3116 OF 10 THE NATIONAL DEFENSE AUTHORIZATION ACT 11 12 Commencing at 9:10 a.m., November 16, 2006 13 at the L'Enfant Plaza Hotel 14 480 L'Enfant Plaza, SW 15 Washington DC 20024 16 17 Public meeting organized by: 18 Advanced Technologies and Laboratories International, Inc. 19 20010 Century Boulevard, Suite 500 20 Germantown, Maryland 20874 21 (301) 972-4430 22 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 2 P R O C E E D I N G S MR. CAMERON: Good morning everyone. My name is Chip Cameron. I'm an assistant general counsel in the office of General Counsel at the Nuclear Regulatory Commission. And I would like to

130

File:07FDBPlantCommissioning.pdf | Open Energy Information  

Open Energy Info (EERE)

FDBPlantCommissioning.pdf FDBPlantCommissioning.pdf Jump to: navigation, search File File history File usage File:07FDBPlantCommissioning.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 42 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 17:28, 25 October 2012 Thumbnail for version as of 17:28, 25 October 2012 1,275 × 1,650 (42 KB) Dklein2012 (Talk | contribs) 17:23, 25 October 2012 Thumbnail for version as of 17:23, 25 October 2012 1,275 × 1,650 (41 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information)

131

Texas Commission on Environmental Quality | Open Energy Information  

Open Energy Info (EERE)

Texas Commission on Environmental Quality Jump to: navigation, search Logo: Texas Commission on Environmental Quality Name Texas Commission on Environmental Quality Address 12100...

132

Preservation and Implementation of Decommissioning Lessons Learned in the United States Nuclear Regulatory Commission  

SciTech Connect

Over the past several years, the United States Nuclear Regulatory Commission (NRC) has actively worked to capture and preserve lessons learned from the decommissioning of nuclear facilities. More recently, NRC has involved industry groups, the Organization of Agreement States (OAS), and the Department of Energy (DOE) in the effort to develop approaches to capture, preserve and disseminate decommissioning lessons learned. This paper discusses the accomplishments of the working group, some lessons learned by the NRC in the recent past, and how NRC will incorporate these lessons learned into its regulatory framework. This should help ensure that the design and operation of current and future nuclear facilities will result in less environmental impact and more efficient decommissioning. In summary, the NRC will continue capturing today's experience in decommissioning so that future facilities can take advantage of lessons learned from today's decommissioning projects. NRC, both individually and collectively with industry groups, OAS, and DOE, is aggressively working on the preservation and implementation of decommissioning lessons learned. The joint effort has helped to ensure the lessons from the whole spectrum of decommissioning facilities (i.e., reactor, fuel cycle, and material facilities) are better understood, thus maximizing the amount of knowledge and best practices obtained from decommissioning activities. Anticipated regulatory activities at the NRC will make sure that the knowledge gained from today's decommissioning projects is preserved and implemented to benefit the nuclear facilities that will decommission in the future.

Rodriguez, Rafael L. [United States Nuclear Regulatory Commission, Office of Federal and State Materials and Environmental Management Programs, Washington, DC 20555 (United States)

2008-01-15T23:59:59.000Z

133

Indexes to Nuclear Regulatory Commission Issuances, July--December 1993. Volume 38, Index 2  

Science Conference Proceedings (OSTI)

Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Digests and Headers; Legal Citations Index; Subject Index, and Facility Index.

Not Available

1994-04-01T23:59:59.000Z

134

Commissioning  

SciTech Connect

Building managers often find that HVAC, lighting and other systems in new buildings need adjustments and modifications. The owner, architect and contractor may mistakenly assume that all of a building`s systems--architectural, mechanical, control and electrical--function according to the design intent. Thus, energy managers can optimize their building`s performance through commissioning, a process that looks for and corrects the defects in a building` operating system or design, immediately before and after it is occupied (following construction or renovation).

Huta, L.G.

1995-12-01T23:59:59.000Z

135

September 10, 2003, Board Public Meeting - Nuclear Regulatory Commission Approach to Oversight  

NLE Websites -- All DOE Office Websites (Extended Search)

4 25 63 carefully, also. In fact, I would like to put in the r e c o r d at this point a letter that the Board sent to Admiral Bowman complimenting him on those reports , because we find them very helpful. Thank you. Any other questions? DR. MANSFIELD: I second that: especially the radiological safety reports and environmental reports. CHAIFWAN CONWAY: Yes , very important , and we thank you. We thank you for your assistance here today . Thank you very much. Now we have the experienced representatives from the Nuclear Regulatory Commission, Ms. Cynthia Carpenter and Dr. Edwin Hackett. If you would each introduce yourselves for the record. MS. CARPENTER: Good morning. My name is Cynthia Carpenter. I'm the Deputy Director of the Division of Inspection Program Management from the

136

Technical Analysis of the Federal Energy Regulatory Commission Technical Conference on Smart Grid Interoperability Standards and the Responses to Questions Asked by the Commission  

Science Conference Proceedings (OSTI)

As specified in the Energy Independence and Security Act of 2007, the National Institute of Standards and Technology (NIST) is required to post smart grid interoperability standards for consideration by the Federal Energy Regulatory Commission (FERC). FERC is to determine if there is sufficient consensus for the standards to be adopted. A FERC technical conference was held on January 31, 2011, to review the five families of standards that were posted by NIST. The FERC Commissioners posed questions to two...

2011-10-26T23:59:59.000Z

137

United Nations Economic Commission for Europe | Open Energy Information  

Open Energy Info (EERE)

Europe Europe Jump to: navigation, search Name United Nations Economic Commission for Europe Address UN Economic Commission for Europe Information Service Palais des Nations Place Geneva, Switzerland Year founded 1947 Phone number +41 (0) 22 917 44 44 Website http://www.unece.org/Welcome.h Coordinates 46.2266748°, 6.1404115° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.2266748,"lon":6.1404115,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

138

Independent Verification and Validation Of SAPHIRE 8 Risk Management Project Number: N6423 U.S. Nuclear Regulatory Commission  

Science Conference Proceedings (OSTI)

This report provides an evaluation of the risk management. Risk management is intended to ensure a methodology for conducting risk management planning, identification, analysis, responses, and monitoring and control activities associated with the SAPHIRE project work, and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Kent Norris

2009-11-01T23:59:59.000Z

139

Public Service Commission of Wisconsin | Open Energy Information  

Open Energy Info (EERE)

Public Service Commission of Wisconsin Jump to: navigation, search Name Public Service Commission of Wisconsin Address 610 North Whitney Way Place Madison, Wisconsin Zip 53707-7854...

140

Re: Request for Information on Regulatory Burden of DOE Regulations...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Re: Request for Information on Regulatory Burden of DOE Regulations Comments from Edison Electric Institute on DOE's Request for Information regarding the burden of DOE...

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Executive Director for Operations OPTIONS FOR U.S. NUCLEAR REGULATORY COMMISSION INVOLVEMENT WITH THE NAVYS REMEDIATION OF THE  

E-Print Network (OSTI)

To obtain Commission approval on options for the U.S. Nuclear Regulatory Commissions (NRCs) involvement with the Navys remediation of the Hunters Point Naval Shipyard (HPS) site, and recommended actions to inform the U.S. Environmental Protection Agency (EPA), the Navy, and stakeholders about the Commissions decision regarding NRCs involvement. This paper does not address any new commitments. SUMMARY: In July 2007 the Navy requested that NRC clarify the potential for NRC involvement with the remediation of the HPS site in San Francisco, California. The Navy explained that resolving uncertainties about NRC jurisdiction and involvement is important because of the potential impact on the Navys ongoing remediation and expedited schedules needed to support the redevelopment plans of the City of San Francisco for the site. These redevelopment plans and schedules have high visibility and considerable support from elected Federal, State, and local officials. In response to the Navys request, the staff has evaluated three options for NRCs involvement at the HPS and related policy issues. The staff recommends the option of relying CONTACT:

R. W. Borchardt; Robert L. Johnson

2008-01-01T23:59:59.000Z

142

Motor-operated valve reliability programs: Lessons learned to meet new NRC (Nuclear Regulatory Commission) requirements  

Science Conference Proceedings (OSTI)

In recent years, reliability problems have surfaced with power plant motor-operated valves (MOVs) that (a) fail to perform as designed, and/or (b) require excessive maintenance to perform their intended function. As a result, the US Nuclear Regulatory Commission (NRC) mandated certain testing and reporting requirements in inspection and enforcement bulletin 85-03 (85-03). The NRC's generic letter 89-10 (89-10) significantly expands these requirements, to include all safety-related and position-changeable MOVs. The MOV program experience at the Sacramento Municipal Utility District (SMUD) Rancho Seco plant is particularly valuable since the NRC, to a large extent, utilized this program as the prototype for 89-10's requirements. The MOV inspection, overhaul, and testing began in September 1986, with completion scheduled for December 1986. The paper discusses problems encountered, recovery plant, results of recovery planning, and lessons learned. Experience at Rancho Seco has shown that comprehensive valve programs incorporating appropriate design practices, preventive maintenance practices, and operational constraints can improve plant availability.

Anderson, M.W.; Fadel, D.P.; Fraser, P.J.

1990-06-01T23:59:59.000Z

143

Remedial action plan for the inactive uranium processing site at Naturita, Colorado. DOE responses to comments from U.S. Nuclear Regulatory Commission and Colorado Department of Public Health and Environment  

SciTech Connect

This report contains responses by the US Department of Energy to comments from the US Nuclear Regulatory Commission and the Colorado Department of Public Health and Environment on the Naturita remedial action plan. This was done in an attempt to clarify information. The site is an inactive uranium processing site at Naturita, Colorado.

NONE

1998-11-16T23:59:59.000Z

144

Vital area identification for U.S. Nuclear Regulatory Commission nuclear power reactor licensees and new reactor applicants.  

SciTech Connect

U.S. Nuclear Regulatory Commission nuclear power plant licensees and new reactor applicants are required to provide protection of their plants against radiological sabotage, including the placement of vital equipment in vital areas. This document describes a systematic process for the identification of the minimum set of areas that must be designated as vital areas in order to ensure that all radiological sabotage scenarios are prevented. Vital area identification involves the use of logic models to systematically identify all of the malicious acts or combinations of malicious acts that could lead to radiological sabotage. The models available in the plant probabilistic risk assessment and other safety analyses provide a great deal of the information and basic model structure needed for the sabotage logic model. Once the sabotage logic model is developed, the events (or malicious acts) in the model are replaced with the areas in which the events can be accomplished. This sabotage area logic model is then analyzed to identify the target sets (combinations of areas the adversary must visit to cause radiological sabotage) and the candidate vital area sets (combinations of areas that must be protected against adversary access to prevent radiological sabotage). Any one of the candidate vital area sets can be selected for protection. Appropriate selection criteria will allow the licensee or new reactor applicant to minimize the impacts of vital area protection measures on plant safety, cost, operations, or other factors of concern.

Whitehead, Donnie Wayne; Varnado, G. Bruce

2008-09-01T23:59:59.000Z

145

Indexes to Nuclear Regulatory Commission issuances, July--December 1996. Volume 44, Index 2  

SciTech Connect

Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decision on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by apellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (operating license, operating license amendment, etc.); type of issuance (memorandum, order, decision, etc.).

1997-04-01T23:59:59.000Z

146

Colorado/Transmission/Regulatory Overview | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission/Regulatory Overview < Colorado‎ | Transmission Jump to: navigation, search Colorado Transmission Transmission Regulatory Overview Roadmap State Data Regulatory Overview General Transmission Permitting at a Glance In Colorado, local governments (counties and municipalities) have the authority to site high-voltage transmission lines. The State's authority in siting is limited to a backstop appeal process, by which utilities may submit an appeal to local government decisions to the Colorado Public Utilities Commission (CPUC) for review and resolution.

147

The International Heat Flow Commission | Open Energy Information  

Open Energy Info (EERE)

The International Heat Flow Commission The International Heat Flow Commission Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: The International Heat Flow Commission Details Activities (1) Areas (1) Regions (0) Abstract: Unavailable Author(s): A. E. Beck, V. Cermak Published: Geothermics, 1989 Document Number: Unavailable DOI: Unavailable Source: View Original Journal Article Data Acquisition-Manipulation (Beck & Cermak, 1989) Unspecified Retrieved from "http://en.openei.org/w/index.php?title=The_International_Heat_Flow_Commission&oldid=387748" Category: Reference Materials What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 1863774514

148

South Fork Tolt River Hydroelectric Project : Adopted Portions of a 1987 Federal Energy Regulatory Commission`s Final Environmental Impact Statement.  

DOE Green Energy (OSTI)

The South Fork Tolt River Hydroelectric Project that world produce 6.55 average megawatts of firm energy per year and would be sited in the Snohomish River Basin, Washington, was evaluated by the Federal Energy Regulatory commission (FERC) along with six other proposed projects for environmental effects and economic feasibility Based on its economic analysis and environmental evaluation of the project, the FERC staff found that the South Fork Tolt River Project would be economically feasible and would result in insignificant Impacts if sedimentation issues could be resolved. Upon review, the BPA is adopting portions of the 1987 FERC FEIS that concern the South Fork Tolt River Hydroelectric Project and updating specific sections in an Attachment.

United States. Bonneville Power Administration.

1992-07-01T23:59:59.000Z

149

Colorado Oil and Gas Conservation Commission | Open Energy Information  

Open Energy Info (EERE)

Oil and Gas Conservation Commission Oil and Gas Conservation Commission Name Colorado Oil and Gas Conservation Commission Place Denver, Colorado References COGCC Website[1] This article is a stub. You can help OpenEI by expanding it. Colorado Oil and Gas Conservation Commission is an organization based in Denver, Colorado. The mission of the Colorado Oil and Gas Conservation Commission (COGCC) is to foster the responsible development of Colorado's oil and gas natural resources. Responsible development results in: The efficient exploration and production of oil and gas resources in a manner consistent with the protection of public health, safety and welfare The prevention of waste The protection of mineral owners' correlative rights The prevention and mitigation of adverse environmental impacts

150

Report to Congress:Impacts of the Federal Energy Regulatory Commission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

"Remedying Undue Discrimination through Open Access Transmission Service and Standard Electricity Market Design." Report to Congress:Impacts of the Federal Energy Regulatory...

151

GRR/Section 7-FD-b - Plant Commissioning Process | Open Energy Information  

Open Energy Info (EERE)

7-FD-b - Plant Commissioning Process 7-FD-b - Plant Commissioning Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-FD-b - Plant Commissioning Process 07FDBPlantCommissioning.pdf Click to View Fullscreen Contact Agencies Bureau of Land Management United States Forest Service Regulations & Policies Mineral Leasing Act of 1920 43 CFR 3200.4 43 CFR 3261.20 43 CFR 3274.10 43 CFR 3274.11 43 CFR 3274.13 43 CFR 3275.11 43 CFR 3275.12 Triggers None specified Click "Edit With Form" above to add content 07FDBPlantCommissioning.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Commercial operations from a Federal lease, a Federal unit, or a

152

Public Utilities Commission of Nevada | Open Energy Information  

Open Energy Info (EERE)

Public Utilities Commission of Nevada Public Utilities Commission of Nevada Jump to: navigation, search Logo: Nevada Public Utilities Commission Name Nevada Public Utilities Commission Address 1150 East William St. Place Carson City, Nevada Zip 89701 Phone number 775-684-6110 Website http://pucweb1.state.nv.us/puc Coordinates 39.1707502°, -119.75655° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.1707502,"lon":-119.75655,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

153

Arizona Oil and Gas Commission | Open Energy Information  

Open Energy Info (EERE)

Oil and Gas Commission Oil and Gas Commission Jump to: navigation, search Logo: Arizona Oil and Gas Commission State Arizona Name Arizona Oil and Gas Commission Address 416 W. Congress Street, Suite 100 City, State Tucson, Arizona Zip 85701 Website http://www.azogcc.az.gov/ Coordinates 32.221642°, -110.977439° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.221642,"lon":-110.977439,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

154

Alaska Oil and Gas Conservation Commission | Open Energy Information  

Open Energy Info (EERE)

Conservation Commission Conservation Commission Jump to: navigation, search Logo: Alaska Oil and Gas Conservation Commission State Alaska Name Alaska Oil and Gas Conservation Commission Address 333 W. 7th Ave., Ste. 100 City, State Anchorage, Alaska Zip 9950 Website http://doa.alaska.gov/ogc/ Coordinates 61.215808°, -149.8889769° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":61.215808,"lon":-149.8889769,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

155

Public Utility Commission of Texas | Open Energy Information  

Open Energy Info (EERE)

Commission of Texas Commission of Texas Jump to: navigation, search Logo: Public Utility Commission of Texas Name Public Utility Commission of Texas Address 1701 N. Congress Avenue Place Austin, Texas Zip 78701 Year founded 1975 Website http://www.puc.texas.gov/ Coordinates 30.2787191°, -97.7388076° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.2787191,"lon":-97.7388076,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

156

Comments on Request For Information regarding Reducing Regulatory Reform  

NLE Websites -- All DOE Office Websites (Extended Search)

Comments on Request For Information regarding Reducing Regulatory Comments on Request For Information regarding Reducing Regulatory Reform issued February 3, 2011 (Federal Register /Vol. 76, No. 23 /Thursday, February 3, 2011 /Notices). Comments on Request For Information regarding Reducing Regulatory Reform issued February 3, 2011 (Federal Register /Vol. 76, No. 23 /Thursday, February 3, 2011 /Notices). I have reviewed the Request For Information regarding Reducing Regulatory Reform issued February 3, 2011 (Federal Register /Vol. 76, No. 23 /Thursday, February 3, 2011 /Notices). In the Department of Energy"s (DOE) attempt to meet its obligation to implement Executive Order 13563, ""Improving Regulation and Regulatory Review,"" issued by the President on January 18, 2011, I recommend DOE make a bold move to change

157

Occupational Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities 2010, Prepared for the Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, May 2012  

SciTech Connect

This report summarizes the occupational exposure data that are maintained in the U.S. Nuclear Regulatory Commissions (NRC) Radiation Exposure Information and Reporting System (REIRS). The bulk of the information contained in the report was compiled from the 2010 annual reports submitted by five of the seven categories of NRC licensees subject to the reporting requirements of 10 CFR 20.2206. Because there are no geologic repositories for high-level waste currently licensed and no NRC-licensed low-level waste disposal facilities currently in operation, only five categories will be considered in this report. The annual reports submitted by these licensees consist of radiation exposure records for each monitored individual. These records are analyzed for trends and presented in this report in terms of collective dose and the distribution of dose among the monitored individuals. Annual reports for 2010 were received from a total of 190 NRC licensees. The summation of reports submitted by the 190 licensees indicated that 192,424 individuals were monitored, 81,961 of whom received a measurable dose. When adjusted for transient workers who worked at more than one licensee during the year, there were actually 142,471 monitored individuals and 62,782 who received a measurable dose. The collective dose incurred by these individuals was 10,617 person-rem, which represents a 12% decrease from the 2009 value. This decrease was primarily due to the decrease in collective dose at commercial nuclear power reactors, as well as a decrease in the collective dose for most of the other categories of NRC licensees. The number of individuals receiving a measurable dose also decreased, resulting in an average measurable dose of 0.13 rem for 2010. The average measurable dose is defined as the total effective dose equivalent (TEDE) divided by the number of individuals receiving a measurable dose. In calendar year 2010, the average annual collective dose per reactor for light water reactor (LWR) licensees was 83 person-rem. This represents a 14% decrease from the value reported for 2009 (96 person-rem). The decrease in collective dose for commercial nuclear power reactors was due to an 11% decrease in total outage hours in 2010. During outages, activities involving increased radiation exposure such as refueling and maintenance are performed while the reactor is not in operation. The average annual collective dose per reactor for boiling water reactors (BWRs) was 137 personrem for 35 BWRs, and 55 person-rem for 69 pressurized water reactors (PWRs). Analyses of transient individual data indicate that 29,333 individuals completed work assignments at two or more licensees during the monitoring year. The dose distributions are adjusted each year to account for the duplicate reporting of transient individuals by multiple licensees. The adjustment to account for transient individuals has been specifically noted in footnotes in the figures and tables for commercial nuclear power reactors. In 2010, the average measurable dose per individual for all licensees calculated from reported data was 0.13 rem. Although the average measurable dose per individual from data submitted by licensees was 0.13 rem, a corrected dose distribution resulted in an average measurable dose per individual of 0.17 rem.

D. E. Lewis D. A. Hagemeyer Y. U. McCormick

2012-07-07T23:59:59.000Z

158

USING TECHNOLOGY TO SUPPORT PROACTIVE MANAGEMENT OF MATERIALS DEGRADATION FOR THE U.S. NUCLEAR REGULATORY COMMISSION  

SciTech Connect

The majority of the U.S. reactor fleet is applying for license renewal to extend the operating life from the current 40 years to 60 years, and there is now active interest in extending the operating life to beyond 60 years. Many plants are also applying for increases in power rating and both of these changes increases the need for an improved understanding of materials degradation. Many materials degrade over time and much is known about the degradation of materials under normal environmental conditions; however, less is known about the characteristics of materials degradation when the environment is subject to higher than normal radiological conditions over extended periods of time. Significant efforts are being made by industrial, academic and regulatory groups worldwide to identify, classify and mitigate potential problems arising from degradation of components in this context. From a regulatory perspective, the U.S. Nuclear Regulatory Commission (USNRC) is very interested in being able to identify ways to insure their licensees proactively manage the identification of materials degradation and the mitigation of its effects. To date, the USNRC has consolidated generic programs for mitigating aging issues in the two volume Generic Aging Lessons Learned (GALL) Report (NUREG-1801) [1][2], and have encouraged applicants for license renewal to use these programs where applicable in their plant when applying for renew of their reactors license. The USNRC has also published a comprehensive report entitled Expert Panel Report on Proactive Materials Degradation (NUREG/CR-6923) [3] that inventories the types of degradation mechanisms that could exist in each component of a Light Water Reactor (LWR) and each degradation mechanism is assessed regarding how much is known about mitigating its effects. Since the number of plant designs and materials used varies greatly within the U.S. fleet, there are many variations to implementing aging management programs (AMPs), requiring significant dialogs between the Licensee and the USNRC. These discussions are part of the licensing basis and as such are documented with up to multi-hundred page responses that are loosely coupled through the USNRC Agency-wide Document Access and Management System (ADAMS), which serves as an electronic records repository for the USNRC . These discussions have supported revisions to the GALL, including the revision that is being prepared as this paper is being written. The USNRC has sought the help of the Pacific Northwest National Laboratory to improve the staffs ability to navigate the significant numbers of documents that are generated in this process and to provide a forum for regulators, licensees and researchers to share knowledge in the efforts to improve the cyclic process for defining, applying, validating and re-defining AMPs. Work to date in this area is publicly accessible and this paper will describe that work and outline a potential path forward. The presenter will also demonstrate the capabilities of the PMMD information tools (http://pmmd.pnl.gov).

Taylor, W Boyd; Knobbs, Katherine J.; Carpenter, C. E. (Gene) [Gene; Malik, Shah

2010-07-19T23:59:59.000Z

159

Wyoming Oil and Gas Conservation Commission | Open Energy Information  

Open Energy Info (EERE)

Wyoming Oil and Gas Conservation Commission Wyoming Oil and Gas Conservation Commission Jump to: navigation, search State Wyoming Name Wyoming Oil and Gas Conservation Commission Address 2211 King Blvd City, State Casper, Wyoming Zip 82602 Website http://wogcc.state.wy.us/ Coordinates 42.8433001°, -106.3511243° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.8433001,"lon":-106.3511243,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

160

Kansas Corporation Commission Energy Division | Open Energy Information  

Open Energy Info (EERE)

Kansas Corporation Commission Energy Division Kansas Corporation Commission Energy Division Jump to: navigation, search Name Kansas Corporation Commission Energy Division Address 1500 SW Arrowhead Road Place Topeka, KS Zip 66604-4074 Phone number 785-271-3152 Website http://www.kcc.ks.gov/energy/i Coordinates 39.04059°, -95.756198° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.04059,"lon":-95.756198,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Oklahoma Corporate Commission Oil and Gas | Open Energy Information  

Open Energy Info (EERE)

Corporate Commission Oil and Gas Corporate Commission Oil and Gas Jump to: navigation, search State Oklahoma` Name Oklahoma Corporate Commission Oil and Gas City, State Oklahoma City, Oklahoma Zip 73152-2000 Website http://www.occeweb.com/og/ogho Coordinates 35.49°, -97.51° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.49,"lon":-97.51,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

162

Arkansas Oil and Gas Commission | Open Energy Information  

Open Energy Info (EERE)

Arkansas Oil and Gas Commission Arkansas Oil and Gas Commission Jump to: navigation, search State Arkansas Name Arkansas Oil and Gas Commission Address 301 Natural Resources Dr. Ste 102 City, State Little Rock, AR Zip 72205 Website http://www.aogc.state.ar.us/JD Coordinates 34.7586275°, -92.3894219° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.7586275,"lon":-92.3894219,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

163

Greer Commission of Public Wks | Open Energy Information  

Open Energy Info (EERE)

Greer Commission of Public Wks Greer Commission of Public Wks Jump to: navigation, search Name Greer Commission of Public Wks Place South Carolina Utility Id 7654 Utility Location Yes Ownership M NERC Location SERC NERC SERC Yes Activity Buying Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Large Commercial Service Rate, Demand greater than 30 KW Commercial Large Commercial Service Rate, Demand less than 30 KW Commercial Rental Lights - 100 Watt HPS/175 Watt Mercury Lighting Rental Lights - 1000 Watt Lighting Rental Lights - 250 Watt Lighting Rental Lights - 400 Watt Lighting

164

Energy and water development appropriations for 1986. Part 6. Nuclear Regulatory Commission. Hearings before a Subcommittee of the Committee on Appropriations, House of Representatives, Ninety-Ninth Congress, First Session  

SciTech Connect

Part 6 of the hearing record covers testimony by Nunzio J. Palladino and other commissioners and directors of the Nuclear Regulatory Commission (NRC), who described how NRC is organized and how it operates in response to a survey and study of NRC operations prepared for the Committee on Appropriations. The witnesses responded to negative reports of distrust, fiscal inefficiency, ambiguity, and a failure to modify regulatory requirements to reflect new information. The witnesses disagreed that there has been any decline or compromise with plant safety, but agreed that the backfitting program needs better procedures. The volume includes the text of the report and both written comment and oral testimony before the committee.

1985-01-01T23:59:59.000Z

165

U. S. Nuclear Regulatory Commission budget estimates Fiscal Year 1978. Appropriations: salaries and expenses  

SciTech Connect

Budget estimates are presented for: nuclear reactor regulation (NRR); Standards development (SD); Inspection and enforcement (IandE); Nuclear material safety and safeguards (NMSS); Nuclear regulatory research (RES); Program technical support (PTS); and Program direction and administration (PDA); Special supporting tables are included.

1977-03-01T23:59:59.000Z

166

Colorado Commission of Indian Affairs | Open Energy Information  

Open Energy Info (EERE)

Indian Affairs Indian Affairs Jump to: navigation, search Logo: Colorado Commission of Indian Affairs Name Colorado Commission of Indian Affairs Address 130 State Capitol Place Denver, Colorado Zip 80202 Year founded 1976 Website http://www.colorado.gov/cs/Sat Coordinates 39.7392291°, -104.9848151° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.7392291,"lon":-104.9848151,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

167

United Nations Economic Commission for Africa | Open Energy Information  

Open Energy Info (EERE)

Africa Africa Jump to: navigation, search Name United Nations Economic Commission for Africa Address Economic Commission for Africa, P.O. Box 3001, Addis Ababa, Ethiopia Place Addis Ababa, Ethiopia Year founded 1958 Phone number +251 11 551 7200 Website http://www.uneca.org/index.htm Coordinates 9.022736°, 38.746799° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":9.022736,"lon":38.746799,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

168

European Commission Joint Research Centre | Open Energy Information  

Open Energy Info (EERE)

Research Centre Research Centre Jump to: navigation, search Logo: European Commission Joint Research Centre Name European Commission Joint Research Centre Address 1049 Brussels Place Brussels, Belgium Year founded 1957 Website http://ec.europa.eu/dgs/jrc/in Coordinates 50.8509279°, 4.3601162° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.8509279,"lon":4.3601162,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

169

Federal Energy Regulatory Commission Interconnection Queue Practices Technical Conference December 11, 2007  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Workshop December 8, 2011 Hilton St. Louis Airport, 10330 Natural Bridge Road, St. Louis, Missouri 63134 Presented by: Jerry Lein Public Utility Analyst North Dakota Public Service Commission Phone: 701 328-1035 Fax: 701 328-2410 jlein@nd.gov Overview * ND Electric Energy Resources * Need for New Transmission - Interconnection Difficulties - Transmission Constraints * Regional Transmission Projects Update * Capacity Deliverability between RTOs ND Electric Energy Resources * ND Ranked #1 in U.S. for Wind Energy Potential - 1991 Pacific Northwest Labs study found ND Wind could potentially supply 36% of U.S. electric energy consumption. -

170

Kansas Oil and Gas Conservation Commission | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Kansas Oil and Gas Conservation Commission Jump to: navigation, search State Kansas Name Kansas Oil and Gas Conservation Commission Address 1500 SW Arrowhead Road City, State Topeka, KS Zip 66604-4027 Website http://www.kcc.state.ks.us/con Coordinates 39.04059°, -95.756198° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.04059,"lon":-95.756198,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

171

Nebraska Oil and Gas Conservation Commission | Open Energy Information  

Open Energy Info (EERE)

State Nebraska State Nebraska Name Nebraska Oil and Gas Conservation Commission Address 922 Illinois City, State Sidney, Nebraska Zip 69162 Website http://www.nogcc.ne.gov/ Coordinates 41.1449288°, -102.9758174° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.1449288,"lon":-102.9758174,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

172

Colorado Oil and Gas Commission | Open Energy Information  

Open Energy Info (EERE)

State Colorado State Colorado Name Colorado Oil and Gas Commission Address 1120 Lincoln Street, Suite 801 City, State Denver, CO Zip 80203 Website http://cogcc.state.co.us/ Coordinates 39.734421°, -104.985764° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.734421,"lon":-104.985764,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

173

Energy Commission  

E-Print Network (OSTI)

This report was prepared as the result of work sponsored by the California Energy Commission. It does not necessarily represent the views of the Energy Commission, its employees or the State of California. The Energy Commission, the State of California, its employees, contractors and subcontractors make no warrant, express or implied, and assume no legal liability for the information in this report; nor does any party represent that the uses of this information will not infringe upon privately owned rights. This report has not been approved or disapproved by the California Energy Commission nor has the California Energy Commission passed upon the accuracy or adequacy of the information in this report. ii ACKNOWLEDGMENTS

Larry Waterland; M. Lorraine White; James J. Folkman; Ray Tuvell; Rosella Shapiro; B. B Blevins; Larry Waterl; Stefan Unnasch; Michael Jackson; M. Lorraine White; James M. Folkman; Sherry Stoner; Mckinley Addy; Asish Gautam; Tom Macdonald; Mike Mccormack; Tim Olson; Peter Quinliven

2006-01-01T23:59:59.000Z

174

Government Performance and Results Act: Performance plan FY 1999, U.S. Nuclear Regulatory Commission. Volume 1  

SciTech Connect

The Nuclear Regulatory Commission`s (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency`s strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to help facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended.

Fuches, J.L.

1998-02-01T23:59:59.000Z

175

File:07UTCUtahPublicServiceCommissionProcess.pdf | Open Energy Information  

Open Energy Info (EERE)

UTCUtahPublicServiceCommissionProcess.pdf UTCUtahPublicServiceCommissionProcess.pdf Jump to: navigation, search File File history File usage File:07UTCUtahPublicServiceCommissionProcess.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 25 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 16:28, 8 January 2013 Thumbnail for version as of 16:28, 8 January 2013 1,275 × 1,650 (25 KB) Alevine (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following page links to this file: GRR/Section 7-UT-c - Utah Public Service Commission

176

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission  

E-Print Network (OSTI)

(NRC) staff responses to frequently asked questions on the decommissioning process for commercial, nuclear power reactors. The questions were taken from a variety of sources over the past several years, including written inquiries to the NRC and questions asked at public meetings and during informal discussions with the NRC staff. In responding to the questions, the NRC staff attempted to provide the answers in a clear and non-technical form. With the increase in the number of power reactors beginning the decommissioning process and significant changes that occurred in the regulations since 1996, the staff realized that there was a general lack of understanding of the decommissioning process and the risks associated with decommissioning. This document was developed in response to the staffs concerns. The report contains a definition of decommissioning and a discussion of alternatives. It also provides a focus on decommissioning experiences in the United States and how the NRC regulates the decommissioning process. Questions related to spent fuel, low-level waste, and transportation related to decommissioning are answered. Questions related to license termination, the ultimate disposition of the facility, and finances for completing decommissioning and hazards associated with decommissioning are also addressed. This document also provides responses to questions related to public involvement in decommissioning as well as providing the public with sources for obtaining additional information on decommissioning.

John L Minns; Michael T. Masnik; U. S. Nuclear; Regulatory Commission; Washington D. C. Abstract

2000-01-01T23:59:59.000Z

177

U.S. Nuclear Regulatory Commission Extremely Low Probability of Rupture pilot study : xLPR framework model user's guide.  

Science Conference Proceedings (OSTI)

For the U.S. Nuclear Regulatory Commission (NRC) Extremely Low Probability of Rupture (xLPR) pilot study, Sandia National Laboratories (SNL) was tasked to develop and evaluate a probabilistic framework using a commercial software package for Version 1.0 of the xLPR Code. Version 1.0 of the xLPR code is focused assessing the probability of rupture due to primary water stress corrosion cracking in dissimilar metal welds in pressurizer surge nozzles. Future versions of this framework will expand the capabilities to other cracking mechanisms, and other piping systems for both pressurized water reactors and boiling water reactors. The goal of the pilot study project is to plan the xLPR framework transition from Version 1.0 to Version 2.0; hence the initial Version 1.0 framework and code development will be used to define the requirements for Version 2.0. The software documented in this report has been developed and tested solely for this purpose. This framework and demonstration problem will be used to evaluate the commercial software's capabilities and applicability for use in creating the final version of the xLPR framework. This report details the design, system requirements, and the steps necessary to use the commercial-code based xLPR framework developed by SNL.

Kalinich, Donald A.; Sallaberry, Cedric M.; Mattie, Patrick D.

2010-12-01T23:59:59.000Z

178

September 10, 2003, Board Public Meeting - Nuclear Regulatory Commission - Davis-Besse Lessons Learned  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 6 7 8 9 10 11 12 13 14 15 16 I 17 18 19 20 21 22 24 25 101 inspector to a senior, and then they'll move to another facility, but seven years is the maximum, and that's written in our policy. CHAIRMAN CONWAY: Thank you. Dr. Hackett. DR. HACKETT: Thank you, Mr. Chairman. I have a different challenge today, which is to try and help walk you through a story that's very important to us in the nuclear industry. In general, it dovetails with what Russ and Cindy had been talking about. The thing I'll add on this slide is that during the timeframe from May to October 2002, I was Assistant Team Leader for the NRC's Davis-Besse Lessons Learned Task Force. That's the role in which I'll be presenting this information to you. As you've been doing, I think I found that these work most

179

OVERVIEW OF THE U.S. DEPARTMENT OF ENERGY AND NUCLEAR REGULATORY COMMISSION PERFORMANCE ASSESSMENT APPROACHES: CEMENTITIOUS BARRIERS PARTNERSHIP  

SciTech Connect

Engineered barriers including cementitious barriers are used at sites disposing or contaminated with low-level radioactive waste to enhance performance of the natural environment with respect to controlling the potential spread of contaminants. Drivers for using cementitious barriers include: high radionuclide inventory, radionuclide characteristics (e.g., long half-live, high mobility due to chemical form/speciation, waste matrix properties, shallow water table, and humid climate that provides water for leaching the waste). This document comprises the first in a series of reports being prepared for the Cementitious Barriers Partnership. The document is divided into two parts which provide a summary of: (1) existing experience in the assessment of performance of cementitious materials used for radioactive waste management and disposal and (2) sensitivity and uncertainty analysis approaches that have been applied for assessments. Each chapter is organized into five parts: Introduction, Regulatory Considerations, Specific Examples, Summary of Modeling Approaches and Conclusions and Needs. The objective of the report is to provide perspective on the state of the practice for conducting assessments for facilities involving cementitious barriers and to identify opportunities for improvements to the existing approaches. Examples are provided in two contexts: (1) performance assessments conducted for waste disposal facilities and (2) performance assessment-like analyses (e.g., risk assessments) conducted under other regulatory regimes. The introductory sections of each section provide a perspective on the purpose of performance assessments and different roles of cementitious materials for radioactive waste management. Significant experience with assessments of cementitious materials associated with radioactive waste disposal concepts exists in the US Department of Energy Complex and the commercial nuclear sector. Recently, the desire to close legacy facilities has created a need to assess the behavior of cementitious materials for applications in environmental remediation and decontamination and decommissioning (D&D) applications. The ability to assess the use and benefits of cementitious materials for these applications can significantly affect decisions related to cleanup activities. For example the need for costly remedial actions may not be necessary if existing or new cementitious barriers were adequately represented. The sections dealing with regulatory considerations include summaries of the different regulations that are relevant for various applications involving cementitious materials. A summary of regulatory guidance and/or policies pertaining to performance assessment of cementitious materials and sensitivity and uncertainty analyses is also provided in the following chapters. Numerous examples of specific applications are provided in each report. The examples are organized into traditional waste disposal applications (performance assessments), applications related to environmental remediation and D&D, and reactor and spent fuel related assessments. Sections that discuss specific facilities or sites contain: (1) descriptions of the role of the cementitious barriers or sensitivity/uncertainty analysis, (2) parameter assumptions and conceptual models, and (3) a relative discussion of the significance in the context of the assessment. Examples from both the U.S. Department of Energy Sites and the U.S. Nuclear Regulatory Commission are provided to illustrate the variety of applications and approaches that have been used. In many cases, minimal credit was taken for cementitious barriers. However, in some of those cases, benefits of being able to take credit for barriers were identified. The examples included: (1) disposal facilities (vaults, trenches, tank closures, cementitious waste forms and containers, etc.), (2) environmental remediation (old disposal facilities), (3) reactor and large structure decommissioning, and (4) spent fuel pools. These examples were selected to provide a perspective on the various ne

Langton, C.; Burns, H.

2009-05-29T23:59:59.000Z

180

U.S. Nuclear Regulation Data (Information Digest, 2010 - 2011...  

Open Energy Info (EERE)

Nuclear Regulation Data (Information Digest, 2010 - 2011) The US Nuclear Regulatory Commission (NRC) publishes an Information Digest containing summary information about the NRC...

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Technical Considerations for the Nuclear Regulatory Commission/ National Academy of Sciences Proposed Study: Cancer in Populations L iving Near Nuclear Facilities  

Science Conference Proceedings (OSTI)

The U.S. Nuclear Regulatory Commission (NRC), through the National Academy of Sciences (NAS), is updating the 1990 U.S. National Institutes of Health - National Cancer Institute (NCI) report, Cancer in Populations Living near Nuclear Facilities. The Electric Power Research Institute (EPRI) formed a committee of scientists and professionals in the fields of epidemiology, radiation biology, nuclear plant effluents, and environmental risk assessment to provide study design considerations to the NAS committe...

2011-11-04T23:59:59.000Z

182

Harmonizing the International Electrotechnical Commission Common Information Model (CIM) and 61850  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) has sponsored the development of a number of international standards that provide the basis for information exchange to support power system management. One of the most important standards is the International Electrotechnical Commission (IEC) Common Information Model (CIM), which is rapidly gaining acceptance throughout the world as a common semantic model to unify and integrate the data from numerous systems involved in the support of real-time electric util...

2010-05-07T23:59:59.000Z

183

Nuclear Regulatory Commission issuances  

SciTech Connect

This document is the March 1996 listing of NRC issuances. Included are: (1) NRC orders granting Cleveland Electric Illuminating Company`s petition for review of the ASLB order LBP-95-17, (2) NRC orders relating to the potential disqualification of two commissioners in the matter of the decommissioning of Yankee Nuclear Power Station, (3) ASLB orders pertaining to the Oncology Services Corporation, (4) ASLB orders pertaining to the Radiation Oncology Center, (5) ASLB orders pertaining to the Yankee Nuclear Power Station, and (6) Director`s decision pertaining to the Yankee Nuclear Power Station.

NONE

1996-03-01T23:59:59.000Z

184

Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1995--December 31, 1995. Volume 42, Pages 1-258  

Science Conference Proceedings (OSTI)

This is the 42nd volume of issuances of the U.S. Nuclear Regulatory Commission (NRC) and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. This book is a reprinting, containing corrections of numerous printing errors in a previously distributed book. It covers the period from July 1, 1995 to December 31, 1995. Atomic Safety and Licensing Boards conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities, and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a 6-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly editions and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition.

NONE

1996-11-01T23:59:59.000Z

185

California Energy Commission DRAFT COMMISSION REPORT  

E-Print Network (OSTI)

Via E-Filing RE: Klamath Hydroelectric Project (FERC Project No. 2082). California Energy Commission COMMISSION 1516 NINTH STREET SACRAMENTO, CA 95814-5512 www.energy.ca.gov April 19, 2007 Ms. Philis Posey Acting Secretary Federal Energy Regulatory Commission 888 First Street NE ­ Room 1A Washington, DC 20246

186

ALL AGREEMENT STATES OPPORTUNITY TO PROVIDE INPUT ON THE U.S. NUCLEAR REGULATORY COMMISSIONS MANUAL CHAPTER FOR THE MATERIALS INSPECTION PROGRAM- INSPECTION MANUAL CHAPTER 2800 (FSME-10-013)  

E-Print Network (OSTI)

Purpose: To provide an opportunity for Agreement States to review and comment on recommended changes addressing the U.S. Nuclear Regulatory Commissions (NRC) materials inspection program. This is an opportunity to provide input * on Inspection Manual Chapter (IMC) 2800. Background: The last revision to Inspection Manual Chapter 2800 (IMC 2800) occurred in September 2005. Since that time, the NRC and Agreement States have implemented new security requirements. This revision provides inspection guidance in regards to some of the more urgent new security requirements, including changes from the Government Accountability Office action plan, as well as to update the previous version in regard to other, lower priority changes. This request supersedes letter RCPD-08-013 dated August 20, 2008, which requested a similar review of IMC 2800. This revision incorporates the comments received from Agreement States that responded to RCPD-08-013.

unknown authors

2010-01-01T23:59:59.000Z

187

Implementation of the Regulatory Authority Information System in Egypt  

Science Conference Proceedings (OSTI)

As part of the implementation of a bar-code-based system to track radioactive sealed sources (RSS) in Egypt, the Regulatory Authority Information System Personal Digital Assistant (RAIS PDA) Application was developed to extend the functionality of the International Atomic Energy Agency's (IAEA's) RAIS database by allowing users to download RSS data from the database to a portable PDA equipped with a bar-code scanner. [1, 4] The system allows users in the field to verify radioactive sealed source data, gather radioactive sealed source audit information, and upload that data to the RAIS database. This paper describes the development of the RAIS PDA Application, its features, and how it will be implemented in Egypt. (authors)

Carson, S.D. [Sandia National Laboratories, P.O. Box 5800, Albuquerque, NM 87185 (United States); Schetnan, R. [Compa Industries, 1314 Madiera Drive, SE, Albuquerque, NM 87108 (United States); Hasan, A. [New Mexico Institute of Mining and Technology Research Institute, Albuquerque, NM (United States); Mohamed, Y.T. [Egyptian Atomic Energy Authority, 3 Ahmed El-Zomor Street, Cairo, 11762 (Egypt)

2006-07-01T23:59:59.000Z

188

A compilation of reports of the Advisory Committee on Reactor Safeguards, 1997 annual, U.S. Nuclear Regulatory Commission. Volume 19  

Science Conference Proceedings (OSTI)

This compilation contains 67 ACRS reports submitted to the Commission, or to the Executive Director for Operations, during calendar year 1997. It also includes a report to the Congress on the NRC Safety Research Program. Specific topics include: (1) advanced reactor designs, (2) emergency core cooling systems, (3) fire protection, (4) generic letters and issues, (5) human factors, (6) instrumentation, control and protection systems, (7) materials engineering, (8) probabilistic risk assessment, (9) regulatory guides and procedures, rules, regulations, and (10) safety research, philosophy, technology and criteria.

NONE

1998-04-01T23:59:59.000Z

189

Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Kent Norris

2010-02-01T23:59:59.000Z

190

Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Kent Norris

2010-03-01T23:59:59.000Z

191

Nuclear Regulatory Commission Issuances: Opinions and decisions of the Nuclear Regulatory Commission with selected orders. Progress report, January 1, 1996--June 30, 1996. Volume 43, pages 1-358  

Science Conference Proceedings (OSTI)

The hardbound edition of the Nuclear Regulatory Issuances is a final compilation of the monthly issuances. It includes all legal precedents for the agency within a six month period. This is the forty-third volume of issuances.

NONE

1997-05-01T23:59:59.000Z

192

Corridor Rate Analysis Results - Energy Information Administration  

U.S. Energy Information Administration (EIA)

Energy Information Administration 113 ... with the pipeline company tariff rates obtained using the Federal Energy Regulatory Commission Automated System for Tariff

193

Category:Geothermal Regulatory Roadmap Sections | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Category Edit History Facebook icon Twitter icon » Category:Geothermal Regulatory Roadmap Sections Jump to: navigation, search GRR-logo.png Looking for the Geothermal Regulatory Roadmap? Click here for a user-friendly list of Geothermal Regulatory Roadmap pages. Add.png Add a Section Pages in this category are created or edited using the RRSection form. Subcategories This category has the following 2 subcategories, out of 2 total. R [×] Regulatory Roadmap Overview Sections‎ 22 pages [×] Regulatory Roadmap State Sections‎ 362 pages Pages in category "Geothermal Regulatory Roadmap Sections" The following 200 pages are in this category, out of 432 total. (previous

194

Category:Regulatory Roadmap State Sections | Open Energy Information  

Open Energy Info (EERE)

Regulatory Roadmap State Sections Regulatory Roadmap State Sections Jump to: navigation, search GRR-logo.png Looking for the Geothermal Regulatory Roadmap? Click here for a user-friendly list of Geothermal Regulatory Roadmap pages. This is the Regulatory Roadmap State Sections category. Add.png Add an Section Pages in category "Regulatory Roadmap State Sections" The following 200 pages are in this category, out of 339 total. (previous 200) (next 200) G GRR/Section 1-AK-a - Land Use Considerations GRR/Section 1-CA-a - State Land Use Planning GRR/Section 1-HI-a - Land Use Considerations GRR/Section 1-ID-a - Land Use Considerations GRR/Section 1-MT-a - Land Use Considerations GRR/Section 1-NV-a - State Land Use Planning GRR/Section 1-OR-a - Land Use Considerations GRR/Section 11-AK-a - State Cultural Considerations

195

Colorado/Transmission/Regulatory Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Colorado‎ | Transmission Jump to: navigation, search Colorado Transmission Transmission Regulatory Roadmap Roadmap State Data Regulatory Overview General TOOLS Regulatory Roadmap Regulatory Wizard Best Practices Document Library NEPA Database Glossary TECHNOLOGIES Geothermal Solar Water Wind TOPICS Land Use Planning Land Access Exploration Well Field Power Plant Transmission Water Rights Environment The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart

196

Category:Regulatory Roadmap Federal Sections | Open Energy Information  

Open Energy Info (EERE)

Category Category Edit History Facebook icon Twitter icon » Category:Regulatory Roadmap Federal Sections Jump to: navigation, search GRR-logo.png Looking for the Geothermal Regulatory Roadmap? Click here for a user-friendly list of Geothermal Regulatory Roadmap pages. This is the Regulatory Roadmap Federal Sections category. Add.png Add an Section Pages in category "Regulatory Roadmap Federal Sections" The following 48 pages are in this category, out of 48 total. G GRR/Section 1-FD-a - Land Use Planning Process GRR/Section 1-FD-b - Land Use Plan Amendment Process GRR/Section 11-FD-a - NHPA Section 106 - Resource Survey GRR/Section 11-FD-b - Tribal Consultation GRR/Section 11-FD-c - NHPA Section 106 - Effects Assessment GRR/Section 11-FD-d - NHPA Section 106 - Consultation

197

Category:Geothermal Regulatory Roadmap Elements | Open Energy Information  

Open Energy Info (EERE)

Geothermal Regulatory Roadmap Elements Geothermal Regulatory Roadmap Elements Jump to: navigation, search GRR-logo.png Looking for the Geothermal Regulatory Roadmap? Click here for a user-friendly list of Geothermal Regulatory Roadmap pages. Add.png Add an Element Pages in this category are created or edited using the RRElement form. Pages in category "Geothermal Regulatory Roadmap Elements" The following 40 pages are in this category, out of 40 total. 1 GRR/Elements/14-CA-b.1 - NPDES Permit Application GRR/Elements/14-CA-b.10 - Did majority of RWQCB approve the permit GRR/Elements/14-CA-b.11 - EPA Review of Adopted Permit GRR/Elements/14-CA-b.12 - Were all EPA objections resolved GRR/Elements/14-CA-b.13 - NPDES Permit issued GRR/Elements/14-CA-b.2 - Review of application for completeness

198

Category:Regulatory Roadmap Properties | Open Energy Information  

Open Energy Info (EERE)

Regulatory Roadmap Properties Regulatory Roadmap Properties Jump to: navigation, search Properties used in the Geothermal Regulatory Roadmap. Pages in category "Regulatory Roadmap Properties" The following 15 pages are in this category, out of 15 total. E Property:EstimatedTime Property:EstimatedTimeExplained G Property:GRR/ActionableEntity Property:GRR/ActionableEntityType Property:GRR/BestPractices G cont. Property:GRR/ContactAgency Property:GRR/Elements Property:GRR/ElementType Property:GRR/ParentElement Property:GRR/PotentialRoadblocks G cont. Property:GRR/Regulation Property:GRR/SectionCode Property:GRR/SectionNumber Property:GRR/SubsectionElementNumber R Property:Reference Retrieved from "http://en.openei.org/w/index.php?title=Category:Regulatory_Roadmap_Properties&oldid=419537

199

NIST Blue Ribbon Commission on Management and Safety  

Science Conference Proceedings (OSTI)

... the Nuclear Regulatory Commission; the ... response; Environmental safety; Environmental remediation; and Security for hazardous ...

2013-06-12T23:59:59.000Z

200

Rethinking the Informal Economy: Linkages with the Formal Economy and the Formal Regulatory Environment  

E-Print Network (OSTI)

Economic & Th is paper explores the relationship of the informal economy to the formal economy and the formal regulatory environment. It begins with a discussion of the concept of the informal economy and its size, composition, and segmentation. It then discusses the linkages between the informal economy and the formal economy and the formal regulatory environment. Th e conclusion suggests why and how more equitable linkages between the informal economy and the formal economy should be promoted through an appropriate inclusive policy and regulatory environment.

Martha Alter Chen

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Category:Geothermal Regulatory Roadmap Flowcharts | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Category Edit History Facebook icon Twitter icon » Category:Geothermal Regulatory Roadmap Flowcharts Jump to: navigation, search GRR-logo.png Looking for the Geothermal Regulatory Roadmap? Click here for a user-friendly list of Geothermal Regulatory Roadmap flowcharts. Media in category "Geothermal Regulatory Roadmap Flowcharts" The following 200 files are in this category, out of 438 total. (previous 200) (next 200) 0 - OverallFlow-1.pdf 0 - OverallFlow-1.pdf 32 KB 01-FD-a - LandUsePlanning.pdf 01-FD-a - LandUsePlann... 124 KB 01-FD-b - LandUsePlanAmendmentProcess.pdf 01-FD-b - LandUsePlanA... 136 KB 01AKALandUseConsiderations.pdf

202

Category:Regulatory Roadmap Overview Sections | Open Energy Information  

Open Energy Info (EERE)

Sections Sections Jump to: navigation, search GRR-logo.png Looking for the Geothermal Regulatory Roadmap? Click here for a user-friendly list of Geothermal Regulatory Roadmap pages. This is the Regulatory Roadmap Overview Sections category. Add.png Add an Section Pages in category "Regulatory Roadmap Overview Sections" The following 22 pages are in this category, out of 22 total. G GRR/Section 1 - Land Use Overview GRR/Section 10 - On-Site Evaluation Process GRR/Section 11 - Cultural Resource Assessment GRR/Section 12 - Flora & Fauna Resource Assessment Process GRR/Section 13 - Land Use Assessment Process GRR/Section 14 - Water Resource Assessment GRR/Section 15 - Air Quality Assessment Process GRR/Section 16 - Geological Resources Assessment Process G cont.

203

Geothermal Regulatory Roadmap Workshop at GRC | Open Energy Information  

Open Energy Info (EERE)

Roadmap Workshop at GRC Roadmap Workshop at GRC Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections GRR Project Review and Workshop Register for this Event The Geothermal Regulatory Roadmap project team will be holding a project review and summary workshop in Reno in early October. We are inviting all industry and agency personnel who have participated in this process, and any other interested parties to attend and continue to participate in this roadmapping process. Note that although this workshop is timed to be held during the GRC/GEA Conference and Tradeshow, this workshop is not part of that conference; therefore, conference registration is not required to attend the Regulatory Roadmapping workshop. From 10 AM to noon, come and view the permitting roadmaps from the 8 states

204

Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 4. Evaluation of other loads and load combinations  

SciTech Connect

Six topical areas were covered by the Task Group on Other Dynamic Loads and Load Combinations as described below: Event Combinations - dealing with the potential simultaneous occurrence of earthquakes, pipe ruptures, and water hammer events in the piping design basis; Response Combinations - dealing with multiply supported piping with independent inputs, the sequence of combinations between spacial and modal components of response, and the treatment of high frequency modes in combination with low frequency modal responses; Stress Limits/Dynamic Allowables - dealing with inelastic allowables for piping and strain rate effects; Water Hammer Loadings - dealing with code and design specifications for these loadings and procedures for identifying potential water hammer that could affect safety; Relief Valve Opening and Closing Loads - dealing with the adequacy of analytical tools for predicting the effects of these events and, in addition, with estimating effective cycles for fatigue evaluations; and Piping Vibration Loads - dealing with evaluation procedures for estimating other than seismic vibratory loads, the need to consider reciprocating and rotary equipment vibratory loads, and high frequency vibratory loads. NRC staff recommendations or regulatory changes and additional study appear in this report.

Not Available

1984-12-01T23:59:59.000Z

205

Attn: Document Control Desk Mr. Gary Janoskco, Chief Fuel Cycle Licensing Branch, NMSS U.S. Nuclear Regulatory Commission  

E-Print Network (OSTI)

Inc. (PRI) herein submits information concerning the completion of ground water restoration at the A-Wellfield. This information is intended to fulfill the requirements of License Condition 10.1.9.b that requires the submittal of a "Wellfield Completion Report " upon the completion of restoration of each wellfield. As detailed in the attached information, the A-Wellfield 20-Sand Production Zone was mined using the approved In Situ Leach (ISL) Mining Method from January 1988 until July 1991. The ISL mining method involved the addition of gaseous carbon dioxide and oxygen to the natural ground water contained within the 20-Sand Production Zone, the circulation of this solution (known as the lixiviant) through the ore to dissolve the uranium, and the capture of the dissolved uranium at the ion exchange (IX) facility located at Satellite No. 1. After mining was completed in the A-Wellfield, PRI completed ground water restoration from

Smith Ranch Highland

2004-01-01T23:59:59.000Z

206

Regulatory Review and International Comparison  

E-Print Network (OSTI)

in a liberalised electricity market by developing a costs/benefit analysis of different regulatory designs Méditerranéen de l'Energie (OME), France For further information: Martin J.J. Scheepers Energy research Centre by the European Commission, Directorate-General for Energy and Transport, under the Energy Intelligent Europe (EIE

207

Director, Office of Enforcement U.S. Nuclear Regulatory Commission Mail Stop 0-14E1  

E-Print Network (OSTI)

requested that United States Enrichment Corporation (USEC) provide a written response that describes the actions taken or planned to assure there is not a chilling effect on the willingness of employees to raise safety and compliance concerns within USEC or to the NRC as a result of the January 27, 2006 Administrative Law Judge Tiemey's Recommended Decision and Order. The enclosure to this letter provides the requested information. If you have any questions regarding this review, please contact Steven Toelle (301) 564-3250. There are no new commitments contained in this submittal. Sincerely, R. B. StarkeyJ.

Russell B. Starkey, Jr.; Dir; Mr. Michael; R. Johnson; Letter Michael; R. Johnson

2006-01-01T23:59:59.000Z

208

Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 2. Evaluation of seismic designs: a review of seismic design requirements for Nuclear Power Plant Piping  

Science Conference Proceedings (OSTI)

This document reports the position and recommendations of the NRC Piping Review Committee, Task Group on Seismic Design. The Task Group considered overlapping conservation in the various steps of seismic design, the effects of using two levels of earthquake as a design criterion, and current industry practices. Issues such as damping values, spectra modification, multiple response spectra methods, nozzle and support design, design margins, inelastic piping response, and the use of snubbers are addressed. Effects of current regulatory requirements for piping design are evaluated, and recommendations for immediate licensing action, changes in existing requirements, and research programs are presented. Additional background information and suggestions given by consultants are also presented.

Not Available

1985-04-01T23:59:59.000Z

209

European Commission  

NLE Websites -- All DOE Office Websites (Extended Search)

European Commission European Commission Directorate-General for Energy & Transport Ministry of Industry an Energy of the State of Qatar Gulf Co-operation Council Secretariat General EU-GCC Seminar: "Natural Gas Technologies - Realities & Prospects" Doha, Qatar, 7-8 February 2005 STREAM B: "Advanced Technologies for Power Generation through Natural Gas & Desalination" SESSION B.3: STATE OF THE ART OF COMBINED CYCLE PLANT Michael VOLLMER, Head of Combined Cycle Power Plant Development, ALSTOM Power Turbo-Systems February 2005 February 2005 Power Turbo-Systems State Of The Art Combined Cycle Power Plants Michael Vollmer 2 ALSTOM (Switzerland)Ltd© 2005. Preliminary/for discussion purposes only. We reserve all rights in this document and in the information

210

Energy- and water-development appropriations for Fiscal Year 1982. Hearings before the Committee on Appropriations, United States Senate, Ninety-Seventh Congress, First Session on H. R. 4144, an act making appropriations for energy and water development for the fiscal year ending September 30, 1982, and for other purposes. Part 2 (pages 679-1574). Department of Energy, Federal Energy Regulatory Commission, Nuclear Regulatory Commission, Tennessee Valley Authority  

SciTech Connect

Part 2 of the hearing record on appropriations for the fiscal year 1982 DOE budget for certain energy and water development programs opens with remarks by Energy Secretary James B. Edwards, who summarizes the Reagan energy policy of reducing federal participation in the funding and regulation of these projects and gives an overview of DOE programs. Subsequent hearings covered the Federal Power Marketing Administration; high-energy physics and basic energy science, and magnetic fusion; nuclear fission and uranium enrichment programs, conservation and renewable energy programs; departmental and related activities; Federal Energy Regulatory Commission and Nuclear Regulatory Commission, Tennessee Valley Authority, and national security and defense programs. The record covers nine days of hearings. (DCK)

1981-01-01T23:59:59.000Z

211

The Department of Energy's Request for Information on Reducing Regulatory Burden  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy's Department of Energy's Request for Information on Reducing Regulatory Burden Submitted on June 18, 2012 On behalf of the Natural Resources Defense Council and our more than 1.3 million members and online activists, we submit the following comments in response to the Department of Energy's (DOE) Request for Information on Reducing Regulatory Burden. (77 Federal Register 28518, May 15, 2012) NRDC has spent decades working to build and improve the Department of Energy's ("DOE") federal appliance standards programs because of the important energy, environmental, and consumer benefits of appliance

212

File:07-FD-a - PlantCommissioning.pdf | Open Energy Information  

Open Energy Info (EERE)

FD-a - PlantCommissioning.pdf FD-a - PlantCommissioning.pdf Jump to: navigation, search File File history File usage Metadata File:07-FD-a - PlantCommissioning.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 50 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:49, 12 August 2013 Thumbnail for version as of 15:49, 12 August 2013 1,275 × 1,650 (50 KB) Abergfel (Talk | contribs) 12:06, 19 December 2012 Thumbnail for version as of 12:06, 19 December 2012 1,275 × 1,650 (86 KB) Dfitzger (Talk | contribs) 15:42, 1 November 2012 Thumbnail for version as of 15:42, 1 November 2012 1,275 × 1,650 (55 KB) Alevine (Talk | contribs)

213

File:07ORBStatePlantCommissioningProcess (1).pdf | Open Energy Information  

Open Energy Info (EERE)

ORBStatePlantCommissioningProcess (1).pdf ORBStatePlantCommissioningProcess (1).pdf Jump to: navigation, search File File history File usage File:07ORBStatePlantCommissioningProcess (1).pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 78 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 17:49, 19 November 2012 Thumbnail for version as of 17:49, 19 November 2012 1,275 × 1,650 (78 KB) Dklein2012 (Talk | contribs) 12:12, 28 September 2012 Thumbnail for version as of 12:12, 28 September 2012 1,275 × 1,650 (47 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup

214

Risk-informed applications and online maintenance in France and the United States  

E-Print Network (OSTI)

During the past twenty-five years, the US Nuclear Regulatory Commission has been progressing toward a more risk-informed, performance-based regulation. This regulatory framework has effectively supported the development ...

Verdier, Edouard (Edouard Pierre Emmanuel)

2012-01-01T23:59:59.000Z

215

Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report  

Science Conference Proceedings (OSTI)

OAK B188 Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report. The overall goal of this research project is to support innovation in new nuclear power plant designs. This project is examining the implications, for future reactors and future safety regulation, of utilizing a new risk-informed regulatory system as a replacement for the current system. This innovation will be made possible through development of a scientific, highly risk-formed approach for the design and regulation of nuclear power plants. This approach will include the development and/or confirmation of corresponding regulatory requirements and industry standards. The major impediment to long term competitiveness of new nuclear plants in the U.S. is the capital cost component--which may need to be reduced on the order of 35% to 40% for Advanced Light Water Reactors (ALWRS) such as System 80+ and Advanced Boiling Water Reactor (ABWR). The required cost reduction for an ALWR such as AP600 or AP1000 would be expected to be less. Such reductions in capital cost will require a fundamental reevaluation of the industry standards and regulatory bases under which nuclear plants are designed and licensed. Fortunately, there is now an increasing awareness that many of the existing regulatory requirements and industry standards are not significantly contributing to safety and reliability and, therefore, are unnecessarily adding to nuclear plant costs. Not only does this degrade the economic competitiveness of nuclear energy, it results in unnecessary costs to the American electricity consumer. While addressing these concerns, this research project will be coordinated with current efforts of industry and NRC to develop risk-informed, performance-based regulations that affect the operation of the existing nuclear plants; however, this project will go further by focusing on the design of new plants.

NONE

2000-08-01T23:59:59.000Z

216

CALIFORNIA COMMISSION  

E-Print Network (OSTI)

aspects of energy industry supply, production, transportation, delivery and distribution, demand CALIFORNIA ENERGY COMMISSION SCENARIO-BASED ASSESSMENT OF RESOURCE PLANS PREDICATED Integrated Energy Policy Report #12;CALIFORNIA ENERGY COMMISSION Michael R. Jaske Principal Author Global

217

H. R. 1711: a Bill to authorize appropriations for the Nuclear Regulatory Commission for fiscal year 1986 and fiscal year 1987. Introduced in the House of Representatives, Ninety-Ninth Congress, First Session  

SciTech Connect

Nuclear Regulatory Commission (NRC) appropriations for fiscal years 1986 and 1987 are $429 million and $460 million, respectively. The Bill allocates sums for each year for reactor regulation, inspection and enforcement, nuclear material safety and safeguards, reactor research, program technical support, and program administration. The Bill cites conditions for spending the funds and for entering into grants and cooperative agreements. The NRC is authorized to issue reactor operating licenses in the absence of a state or local emergency preparedness plan if it determines that public safety is assured.

1985-01-01T23:59:59.000Z

218

Shewregdb: Database and visualization environment for experimental and predicted regulatory information in Shewanella oneidensis mr-1  

SciTech Connect

Shewanella oneidensis MR-1 is an important model organism for environmental research as it has an exceptional metabolic and respiratory versatility regulated by a complex regulatory network. We have developed a database to collect experimental and computational data relating to regulation of gene and protein expression and a visualization environment that enables integration of these data types. The regulatory information in the database was collected from the published literature and different Internet resources. It includes predictions of DNA regulator binding sites, sigma factor binding sites, transcription units, operons, promoters, and RNA regulators including non-coding RNAs, riboswitches, and different types of terminators. A visualization environment based on GBrowser was developed for accessing the collected information and for its overlaying with experimental data (experimental results from studies employing microarrays, proteomics, and/or gene mutagenesis) and other genome annotations.

Syed, Mustafa; Karpinets, Tatiana V.; Leuze, Mike; Kora, Guruprasad; Romine, Margaret F.; Uberbacher, Edward

2009-10-15T23:59:59.000Z

219

Regulatory Perspective on the Use of Cementitious ...  

United States Nuclear Regulatory Commission 1 ... - Development of accelerated laboratory-scale test methods. - Compilation of a database of ...

220

Commission | OpenEI  

Open Energy Info (EERE)

57 57 Varnish cache server Commission Dataset Summary Description This dataset contains oil and gas drilling and permit records for February 2011. State oil and gas boards and commissions make oil and gas data and information open to the public. To view the full range of data contained at the Alaska Oil and Gas Conservation Commission, visit http://doa.alaska.gov/ogc/ Source Alaska Oil and Gas Conservation Commission Date Released February 28th, 2011 (3 years ago) Date Updated Unknown Keywords Alaska Commission gas oil Well record Data application/vnd.ms-excel icon http://doa.alaska.gov/ogc/drilling/dindex.html (xls, 34.3 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Monthly Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Regulatory cross-cutting topics for fuel cycle facilities.  

Science Conference Proceedings (OSTI)

This report overviews crosscutting regulatory topics for nuclear fuel cycle facilities for use in the Fuel Cycle Research&Development Nuclear Fuel Cycle Evaluation and Screening study. In particular, the regulatory infrastructure and analysis capability is assessed for the following topical areas:Fire Regulations (i.e., how applicable are current Nuclear Regulatory Commission (NRC) and/or International Atomic Energy Agency (IAEA) fire regulations to advance fuel cycle facilities)Consequence Assessment (i.e., how applicable are current radionuclide transportation tools to support risk-informed regulations and Level 2 and/or 3 PRA) While not addressed in detail, the following regulatory topic is also discussed:Integrated Security, Safeguard and Safety Requirement (i.e., how applicable are current Nuclear Regulatory Commission (NRC) regulations to future fuel cycle facilities which will likely be required to balance the sometimes conflicting Material Accountability, Security, and Safety requirements.)

Denman, Matthew R.; Brown, Jason; Goldmann, Andrew Scott; Louie, David

2013-10-01T23:59:59.000Z

222

CALIFORNIA COMMISSION  

E-Print Network (OSTI)

with California's coastal power plant fleet; 3) biological resource issues associated with solar thermal.......................................................................23 CHAPTER 3: Cooling Water Use at New Power Plants Subject to Energy Commission Jurisdiction Cooling Water Trends for California Power Plants

223

Guidelines for residential commissioning  

E-Print Network (OSTI)

Potential Benefits of Commissioning California Homes.Delp. 2000. Residential Commissioning: A Review of Relatedfor Evaluating Residential Commissioning Metrics Lawrence

Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

2003-01-01T23:59:59.000Z

224

Commissioning Specifications | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Specifications Specifications Commissioning Specifications October 16, 2013 - 4:44pm Addthis Commissioning specifications outline basic requirements of the commissioning process and detail the roles and responsibilities of each party involved. System checklists, startup requirements, and performance testing procedures are typically included in the specifications to let contractors know what standards are required during the various testing phases involved throughout the commissioning process. Since renewable energy technologies are changing and developing rapidly, it is critical to have the commissioning specifications developed by a well-informed resource with up-to-date renewable energy expertise. This resource must also have a thorough understanding of how renewable energy

225

California Energy Commission COMMISSION REPORT  

E-Print Network (OSTI)

for energy and annual peak load will be met by specific supply resources. Keywords: Electricity resource. California Energy Commission. Electricity Supply Analysis Division. CEC2002010009CMF. #12;ii #12;iii) ................................................................ 20 Supply Form S2: Energy Balance Table

226

California Energy Commission FINAL COMMISSION REPORT  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLES PORTFOLIO STANDARD ELIGIBILITY Sixth Edition Commission Guidebook CALIFORNIA ENERGY COMMISSION Edmund G. Brown Jr., Governor AUGUST 2012 CEC3002012006CMF #12;CALIFORNIA ENERGY COMMISSION ROBERT B. WEISENMILLER, PH.D. Chairman Commissioners KAREN J. DOUGLAS, J

227

Risk Informed Safety Categorization (RISC-3) Seismic Assessment Guidelines  

Science Conference Proceedings (OSTI)

The Nuclear Regulatory Commission (NRC) has amended its regulations to provide an alternative approach for treatment of structures, systems, and components (SSCs) for nuclear power reactors using a risk-informed method of categorizing SSCs according to their safety significance.

2005-12-19T23:59:59.000Z

228

Geothermal industry position paper: EPA regulatory options and research and development information needs  

DOE Green Energy (OSTI)

The environmental impact of geothermal energy development may be less intense or widespread than that of some other energy sources; however, it is the first example of a number of emerging energy technologies that must be dealt with by EPA. EPA may consider a spectrum of options ranging from a posutre of business as usual to one of immediate setting of standards, as favored by ERDA. The paper discusses the regulatory approaches and the potential problems that geothermal energy may present in the areas of air quality, water quality, and other impacts. It is recommended that a coordinated program of research be drawn up, comprised of specific research projects, the types of geothermal resource to which they apply, and the date by which the information is required.

D'Alessio, G.

1977-08-01T23:59:59.000Z

229

Geothermal Industry Position Paper: EPA Regulatory Options and Research and Development Information Needs  

DOE Green Energy (OSTI)

The environmental impact of geothermal energy development may be less intense or widespread than that of some other energy sources; however, it is the first example of a number of emerging energy technologies that must be dealt with by EPA. EPA may consider a spectrum of options ranging from a posture of business as usual to one of immediate setting of standards, as favored by ERDA. The paper discusses the regulatory approaches and the potential problems that geothermal energy may present in the areas of air quality, water quality, and other impacts. It is recommended that a coordinated program of research be drawn up, comprised of specific research projects, the types of geothermal resource to which they apply, and the date by which the information is required.

Swetnam, G.F.

1976-11-01T23:59:59.000Z

230

Tracking the Reliability of the U.S. Electric Power System: An Assessment of Publicly Available Information Reported to State Public Utility Commissions  

SciTech Connect

Large blackouts, such as the August 14-15, 2003 blackout in the northeasternUnited States and Canada, focus attention on the importance of reliable electric service. As public and private efforts are undertaken to improve reliability and prevent power interruptions, it is appropriate to assess their effectiveness. Measures of reliability, such as the frequency and duration of power interruptions, have been reported by electric utilities to state public utility commissions for many years. This study examines current state and utility practices for collecting and reporting electricity reliability information and discusses challenges that arise in assessing reliability because of differences among these practices. The study is based primarily on reliability information for 2006 reported by 123 utilities to 37 state public utility commissions.

LaCommare, Kristina H.; Eto, Joseph H.

2008-10-10T23:59:59.000Z

231

Public Service Commission and Natural Gas Safety Standards (Missouri)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation establishes the state Public Service Commission, which has regulatory authority over the electric, gas, water, and telecommunications utilities. Section 386.572 of this legislation...

232

Natural Gas Outlook - Presented to: Kansas Corporation Commission  

Reports and Publications (EIA)

Presented to: Kansas Corporation Commission, October 28, 2003, Presented by: William Trapmann, Energy Information Administration

Information Center

2003-11-01T23:59:59.000Z

233

Office of Federal and State Materials and Environmental Management Programs U.S. Nuclear Regulatory Commission Mail Stop T8-F5  

E-Print Network (OSTI)

information regarding several sections of the application. In response to that request, Crow Butte Resources, Inc. (CBR) is providing written responses to the NRC request for additional information and revised portions of CBR's application amendment for the North Trend Expansion Area (Technical Report- Volume I). Only the portions of the application that were. revised are included with this submittal for replacement in the original CBR amendment application. In some cases, it was necessary to duplicate some pages without changes due to the addition of text and changes in page numbers. Each page with text changes is,so noted in the footer with the revised date. If you or your staff has any questions on the responses or revisions, please contact me at

Crow Butte Resources; Steve Collings

2008-01-01T23:59:59.000Z

234

What's Up with the California Commissioning Collaborative?  

NLE Websites -- All DOE Office Websites (Extended Search)

What's Up with the California Commissioning Collaborative? What's Up with the California Commissioning Collaborative? Speaker(s): Kristin Heinemeier Date: July 8, 2005 - 12:00pm Location: Bldg. 90 The California Commissioning Collaborative's objectives are: --to improve building performance by developing and promoting viable building commissioning practices in California; --to facilitate the development of cost effective programs, tools, techniques and service delivery infrastructure to enable the implementation of building commissioning processes; --to educate and inform concerning building commissioning processes; and --to identify opportunities, establish priorities and promote solutions relating to building commissioning processes in California. Find out about who the CCC is, and their latest activities,

235

Prepared for U.S. Nuclear Regulatory CommissionI AVAILABILIlY NOTICE Availablity of Reference Mateials Cited In NRC Publications  

E-Print Network (OSTI)

Although the listing that follows represents the majority of documents cited In NRC publications, It Is not Intended to be exhaustive. Referenced documents available for Inspection and copying for a fee from the NRC Public Document Room Include NRC correspondence and Internal NRC memoranda; NRC bulletins, circulars, Information notices. Inspection and Investigation notices; licensee event reports: vendor reports and correspondence; Comrinsslon papers; and applicant and licensee documents and correspondence. The following documents In the NUREG series are available for purchase from the GPO Sales Program:

J. K. Wang; M. S. Kalsi

1990-01-01T23:59:59.000Z

236

Codes and standards and other guidance cited in regulatory documents  

SciTech Connect

As part of the U.S. Nuclear Regulatory Commission (NRC) Standard Review Plan Update and Development Program (SRP-UDP), Pacific Northwest National Laboratory developed a listing of industry consensus codes and standards and other government and industry guidance referred to in regulatory documents. The SRP-UDP has been completed and the SRP-Maintenance Program (SRP-MP) is now maintaining this listing. Besides updating previous information, Revision 3 adds approximately 80 citations. This listing identifies the version of the code or standard cited in the regulatory document, the regulatory document, and the current version of the code or standard. It also provides a summary characterization of the nature of the citation. This listing was developed from electronic searches of the Code of Federal Regulations and the NRC`s Bulletins, Information Notices, Circulars, Enforcement Manual, Generic Letters, Inspection Manual, Policy Statements, Regulatory Guides, Standard Technical Specifications and the Standard Review Plan (NUREG-0800).

Nickolaus, J.R.; Bohlander, K.L.

1996-08-01T23:59:59.000Z

237

COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST FOR INFORMATION REGARDING SMART GRID POLICY COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST...

238

SPEAR3 | Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

list (updated 060605) Power supply list Linear Optics from Closed Orbits (LOCO) Commissioning Schedule Commissioning Program(.ppt) Commissioning Schedule(.mpp) Run Schedule...

239

Quarterly technical report on water reactor safety programs sponsored by the Nuclear Regulatory Commission's Division of Reactor Safety Research, April--June 1975  

SciTech Connect

The current water reactor safety activities of ANC are accomplished in four programs. The Semiscale Program consists of small-scale nonnuclear thermal- hydraulic experiments for the generation of experimental data that can be applied to analytical models describing loss-of-coolant accident (LOCA) phenomena in water-cooled nuclear power plants. Emphasis is placed on acquiring system effects data from integral tests that characterize the most significant thermal- hydraulic phenomena during the depressurization (blowdown) and emergency cooling phase of a LOCA. The LOFT Program provides test data to support: (a) assessment and improvement of the analytical methods utilized for predicting the behavior of pressurized water reactors (PWR) under LOCA conditions; (b) evaluation of the performance of PWR engineered safety features (ESF), particularly the emergency core cooling system (ECCS); and (c) assessment of the quantitative margins of safety inherent in the performance of these safety features. The Thermal Fuels Behavior Program is a program designed to provide information on the behavior of reactor fuels under normal, off-normal, and accident conditions. The experimental portion is concentrated on testing of single fuel rods and fuel rod clusters under power-cooling-mismatch (PCM), loss-of-coolant, and reactivity initiated accident conditions. The Reactor Behavior Program encompasses the analytical aspects of predicting the response of nuclear power reactors under normal, abnormal, and accident conditions. The status of each program is reported. (auth)

1975-11-01T23:59:59.000Z

240

NIST SP 800-59, Guidelines for Identifying an Information ...  

Science Conference Proceedings (OSTI)

... and Health Review Commission, the National Labor Relations Board, the Nuclear Regulatory Commission, the Occupational Safety and Health ...

2012-02-06T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Tsunami Information Sources  

E-Print Network (OSTI)

Commission, Washington, D.C. , NUREG/CR-6372, 1997, 256 ppRegulatory Commission, Paper NUREG/CR- 2840, 1982, 532 pp

Wiegel, Robert L

2005-01-01T23:59:59.000Z

242

The SNS RFQ Commissioning  

E-Print Network (OSTI)

THE SNS RFQ COMMISSIONING * A. Ratti, J. Ayers, L.on a support structure, and commissioning of the RFQ. Theabout 1.0 dB. BEAM COMMISSIONING RESULTS Beam commissioning

2002-01-01T23:59:59.000Z

243

NIST Global Standards Information Smart Grid  

Science Conference Proceedings (OSTI)

... Federal Energy Regulatory Commission's (FERC) Smart Grid Website. GridWise Architecture Council (GWAC) Website. ...

244

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION  

E-Print Network (OSTI)

the proposed action quite obviously entails an increased potential for offsite consequences. Instead by nuclear power plants operating in or proposed for Maryland.@ Id. at 1-2. NIRS explains miles of the proposed reactor. She further recounts that she is Aparticularly 21 See Shaw AREVA MOX

Laughlin, Robert B.

245

Nuclear Regulatory Commission approves construction of ...  

U.S. Energy Information Administration (EIA)

Uranium fuel, nuclear reactors, generation, spent fuel. Total Energy. ... near Spring City, Tennessee after initial construction began in 1973. ...

246

U.S. Nuclear Regulatory Commission  

E-Print Network (OSTI)

Applications International Applications (SAIC) technical and quality program files associated with the development of the draft NUREG. The CNWRA also reviewed the SAIC spreadsheet calculations for analyses used in the draft NUREG. These calculations were transmitted by the NRC to the CNWRA on compact disks The enclosed report includes changes to our previous document (Deliverable 08801.081.001) in response to Reference I and subsequent interactions between the CNWRA and NRC staffs. /7-Washington Office Twinbrook Metro Plaza #210

Account No; Sincf S; L. Camper; C. Haney; Cnwra Directors; R. Benke; R. Nelson; R. Hog

2001-01-01T23:59:59.000Z

247

U.S. Nuclear Regulatory Commission  

E-Print Network (OSTI)

NRC Job Code R3137Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin

Recommendations For Severe; J. A. Jones; N. Bixler; S. Burns; F. J. Schelling

2007-01-01T23:59:59.000Z

248

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION  

E-Print Network (OSTI)

1000 was designed by Westinghouse Electric Company, LLC, and has been formally approved by NRC. See, and show that the member has authorized the organization to intervene on his or her behalf. Vermont Yankee Nuclear Power Corp. (Vermont Yankee Nuclear Power Station), CLI-00-20, 52 NRC 151, 163 (2000). B. Ruling

Laughlin, Robert B.

249

Regulatory analysis technical evaluation handbook. Final report  

Science Conference Proceedings (OSTI)

The purpose of this Handbook is to provide guidance to the regulatory analyst to promote preparation of quality regulatory analysis documents and to implement the policies of the Regulatory Analysis Guidelines of the US Nuclear Regulatory Commission (NUREG/BR-0058 Rev. 2). This Handbook expands upon policy concepts included in the NRC Guidelines and translates the six steps in preparing regulatory analyses into implementable methodologies for the analyst. It provides standardized methods of preparation and presentation of regulatory analyses, with the inclusion of input that will satisfy all backfit requirements and requirements of NRC`s Committee to Review Generic Requirements. Information on the objectives of the safety goal evaluation process and potential data sources for preparing a safety goal evaluation is also included. Consistent application of the methods provided here will result in more directly comparable analyses, thus aiding decision-makers in evaluating and comparing various regulatory actions. The handbook is being issued in loose-leaf format to facilitate revisions. NRC intends to periodically revise the handbook as new and improved guidance, data, and methods become available.

NONE

1997-01-01T23:59:59.000Z

250

Nuclear regulatory legislation, 104th Congress, Volume 1, No. 4  

SciTech Connect

This document is the first of two volumes compiling statutes and material pertaining to nuclear regulatory legislation through the 104th Congress, 2nd Session. It is intended for use as a U.S. Nuclear Regulatory Commission (NRC) internal resource document. Legislative information reproduced in this document includes portions of the Atomic Energy Act, Energy Reorganization Act, Low-Level Radioactive Waste Policy Amendments Act, and Nuclear Waste Policy Act. Other information included in this volume pertains to NRC user fees, NRC authorizations, the Inspector General Act, and the Administrative Procedure Act.

NONE

1997-12-01T23:59:59.000Z

251

Nuclear Energy Research Initiative. Risk Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants. Annual Report  

Science Conference Proceedings (OSTI)

The overall goal of this research project is to support innovation in new nuclear power plant designs. This project is examining the implications, for future reactors and future safety regulation, of utilizing a new risk-informed regulatory system as a replacement for the current system. This innovation will be made possible through development of a scientific, highly risk-informed approach for the design and regulation of nuclear power plants. This approach will include the development and.lor confirmation of corresponding regulatory requirements and industry standards. The major impediment to long term competitiveness of new nuclear plants in the U.S. is the capital cost component--which may need to be reduced on the order of 35% to 40% for Advanced Light Water Reactors (ALWRs) such as System 80+ and Advanced Boiling Water Reactor (ABWR). The required cost reduction for an ALWR such as AP600 or AP1000 would be expected to be less. Such reductions in capital cost will require a fundamental reevaluation of the industry standards and regulatory bases under which nuclear plants are designed and licensed. Fortunately, there is now an increasing awareness that many of the existing regulatory requirements and industry standards are not significantly contributing to safety and reliability and, therefore, are unnecessarily adding to nuclear plant costs. Not only does this degrade the economic competitiveness of nuclear energy, it results in unnecessary costs to the American electricity consumer. While addressing these concerns, this research project will be coordinated with current efforts of industry and NRC to develop risk-informed, performance-based regulations that affect the operation of the existing nuclear plants; however, this project will go farther by focusing on the design of new plants.

Ritterbusch, S.E.

2000-08-01T23:59:59.000Z

252

Commissioning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commissioning Commissioning Commissioning October 16, 2013 - 4:43pm Addthis Project Construction Commissioning Operations & Maintenance Commissioning renewable energy for new construction projects and major renovations requires special consideration in selecting the commissioning agent and team, developing the specifications, conducting the full commissioning process, and integrating measurement and verification (M&V) systems. Commissioning can reduce overall costs related to construction deficiencies and ensure more efficient building and systems operation. For new construction projects or major renovations with renewable energy systems, commissioning is critical to the ultimate goal of operating all building systems as safely, optimally, and efficiently as their designers intended.

253

River Basin Commissions (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation establishes river basin commissions, for the Kankakee, Maumee, St. Joseph, and Upper Wabash Rivers. The commissions facilitate and foster cooperative planning and coordinated...

254

USNRC REGULATORY GUIDES  

E-Print Network (OSTI)

Regulatory Guides are issued to describe and make available to the public methods acceptable to the NRC staff of implementing specific parts of the Commission's regulations, to delineate tech niques used by the staff in evaluating specific problems or postu lated accidents or to provide guidance to applicants. Regulatory Guides are not substitutes for regulations, and compliance with them is not required. Methods and solutions different from those set out in the guides will be acceptable If they provide a basis for the findings requisite to the Issuance or continuance of a permit or license by the Commission. This guide was issued after consideration of comments received from the public. Comments and suggestions for improvements in these guides are encouraged at all times, and guides will be revised, as appropriate, to accommodate comments and to reflect new Informa tion or experience. Comments should be sent to the Secretary of the Commission,

unknown authors

1982-01-01T23:59:59.000Z

255

Summary Report on Industrial and Regulatory Engagement Activities |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary Report on Industrial and Regulatory Engagement Activities Summary Report on Industrial and Regulatory Engagement Activities Summary Report on Industrial and Regulatory Engagement Activities The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies pathway of the Light Water Reactor Sustainability(LWRS) Program conducts a vigorous engagement strategy with the U.S. nuclear power industry, including the nuclear operating companies, major support organizations, the Nuclear Regulatory Commission (NRC), and suppliers. The goal of this engagement strategy is to develop a shared vision and common understanding across the nuclear industry of the need for II&C modernization, the performance improvement that can be obtained, and the opportunities for collaboration to enact this vision. The primary means of engaging the nuclear operating companies is through a

256

NGNP Project Regulatory Gap Analysis for Modular HTGRs  

SciTech Connect

The Next Generation Nuclear Plant (NGNP) Project Regulatory Gap Analysis (RGA) for High Temperature Gas-Cooled Reactors (HTGR) was conducted to evaluate existing regulatory requirements and guidance against the design characteristics specific to a generic modular HTGR. This final report presents results and identifies regulatory gaps concerning current Nuclear Regulatory Commission (NRC) licensing requirements that apply to the modular HTGR design concept. This report contains appendices that highlight important HTGR licensing issues that were found during the RGA study. The information contained in this report will be used to further efforts in reconciling HTGR-related gaps in the NRC licensing structure, which has to date largely focused on light water reactor technology.

Wayne Moe

2011-09-01T23:59:59.000Z

257

Codes and standards and other guidance cited in regulatory documents. Revision 1  

Science Conference Proceedings (OSTI)

As part of the US Nuclear Regulatory Commission (NRC) Standard Review Plan Update and Development Program, Pacific Northwest Laboratory developed a listing of industry consensus codes and standards and other government and industry guidance referred to in regulatory documents. In addition to updating previous information, Revision 1 adds citations from the NRC Inspection Manual and the Improved Standard Technical Specifications. This listing identifies the version of the code or standard cited in the regulatory document, the regulatory document, and the current version of the code or standard. It also provides a summary characterization of the nature of the citation. This listing was developed from electronic searches of the Code of Federal Regulations and the NRC`s Bulletins, Information Notices, Circulars, Generic Letters, Policy Statements, Regulatory Guides, and the Standard Review Plan (NUREG-0800).

Ankrum, A.; Nickolaus, J.; Vinther, R.; Maguire-Moffitt, N.; Hammer, J.; Sherfey, L.; Warner, R. [Pacific Northwest Lab., Richland, WA (United States)

1994-08-01T23:59:59.000Z

258

From the Editors---Brainstorming, Multiplicative Utilities, Partial Information on Probabilities or Outcomes, and Regulatory Focus  

Science Conference Proceedings (OSTI)

This is the final issue under this Editor-in-Chief, so this column is fittingly coauthored with the associate editors, whose terms also end with this issue, to emphasize their major role in the leadership of the journal. We first introduce incoming Editor-in-Chief ... Keywords: Eagle Airlines, QALYs, alternatives, applications, copula, correlation aversion, creation of, decision analysis, decision trees, dependence, editorial, framing, fuzzy logic, gains, health utility analysis, identification of, interval arithmetic, life-cycle consumption planning, losses, medical decision making, multiattribute utility theory, objectives, practice, public policy, regulatory focus, risk, risk aversion, risk proneness, self-regulation, sensitivity to dependence, simulation, standard gamble, time trade-off, uncertainty, value-focused brainstorming, value-focused thinking, verbal protocols

L. Robin Keller; Ali Abbas; J. Eric Bickel; Vicki M. Bier; David V. Budescu; John C. Butler; Enrico Diecidue; Robin L. Dillon-Merrill; Raimo P. Hmlinen; Kenneth C. Lichtendahl; Jason R. W. Merrick; Jay R. Simon; George Wu

2012-12-01T23:59:59.000Z

259

Regulatory Review of Early Site Permit Applications  

Science Conference Proceedings (OSTI)

The U.S. Nuclear Regulatory Commission (NRC) has received and is reviewing three applications for early site permits (ESPs). The ESP process allows early resolution of site-related issues affecting possible construction and operation of a new nuclear power plant. The nuclear industry views a successful and predictable ESP process as an important step in assessing whether to seek authorization to construct and operate a new generation of nuclear power reactors in the United States. Because consideration of ESP applications is a first-of-a-kind activity, a number of issues have emerged prior to and during the reviews of the first three applications. Issues have included the need for design information at the ESP stage, accident analyses, quality assurance, and seismic analyses. The NRC has been working to resolve identified issues to support a Commission decision on whether to issue an ESP approximately 33-37 months after receipt of each ESP application. (authors)

Scott, Michael L. [Senior Project Manager, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555 (United States)

2004-07-01T23:59:59.000Z

260

NIST Global Standards Information Home  

Science Conference Proceedings (OSTI)

... has advised the Federal Energy Regulatory Commission ... Works to Meet Market Needs August 17 ... concerned with developing markets for hydrogen ...

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

File:Public Utility Regulatory Act - Texas.pdf | Open Energy Information  

Open Energy Info (EERE)

Public Utility Regulatory Act - Texas.pdf Public Utility Regulatory Act - Texas.pdf Jump to: navigation, search File File history File usage Metadata File:Public Utility Regulatory Act - Texas.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 Go!

262

Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory...  

Office of Legacy Management (LM)

111989 Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia. Pennsylvania 19406 Dear Mr. Kinneman: -;' .-. 'W...

263

The PCB Information Manual: Volume 2: PCB Releases and Regulatory Issues  

Science Conference Proceedings (OSTI)

Although production of polychlorinated biphenyls (PCBs) in the United States ended in 1977, some types of in-service equipment, such as transformers and capacitors, and many products, such as paints, caulking, and plastics, still contain PCBs. This volume of the PCB Information Manual provides information concerning PCB releases to and PCB levels in the environment, methods of sample collection and analysis, releases of PCBs from electrical equipment, high-temperature PCB releases, and PCB regulations.

2000-09-18T23:59:59.000Z

264

Regulatory cross-cutting topics for fuel cycle facilities.  

SciTech Connect

This report overviews crosscutting regulatory topics for nuclear fuel cycle facilities for use in the Fuel Cycle Research&Development Nuclear Fuel Cycle Evaluation and Screening study. In particular, the regulatory infrastructure and analysis capability is assessed for the following topical areas:Fire Regulations (i.e., how applicable are current Nuclear Regulatory Commission (NRC) and/or International Atomic Energy Agency (IAEA) fire regulations to advance fuel cycle facilities)Consequence Assessment (i.e., how applicable are current radionuclide transportation tools to support risk-informed regulations and Level 2 and/or 3 PRA) While not addressed in detail, the following regulatory topic is also discussed:Integrated Security, Safeguard and Safety Requirement (i.e., how applicable are current Nuclear Regulatory Commission (NRC) regulations to future fuel cycle facilities which will likely be required to balance the sometimes conflicting Material Accountability, Security, and Safety requirements.)

Denman, Matthew R.; Brown, Jason; Goldmann, Andrew Scott; Louie, David

2013-10-01T23:59:59.000Z

265

The Fenno-Skan HVDC link commissioning  

Science Conference Proceedings (OSTI)

The commissioning of the Fenno-Skan HVDC link between Finland and Sweden, with the longest submarine dc cable in the world, is described. The main pre-commissioning activities, important for an efficient commissioning, are discussed together with time schedules and suitable organization forms. The procedures to test special control features, such as subsynchronous oscillation (SSO) damping control are presented. The full scale network interaction tests which are an important part of the commissioning are also discussed. These tests succeeded very well and provided a lot of information about the system behavior for future operation and planning purposes.

Nyman, A. (Swedish State Power Board, Vaellingby (Sweden)); Jaeaeskelaeinen, K.; Vaitomaa, M. (Imatran Voima OY, Vantaa (Finland)); Jansson, B.; Danielsson, K.G. (ABB Power Systems, Ludvika (Sweden))

1994-01-01T23:59:59.000Z

266

Federal Energy Management Program: Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning to someone by E-mail Share Federal Energy Management Program: Commissioning on Facebook Tweet about Federal Energy Management Program: Commissioning on Twitter...

267

ATOMIC ENERGY COMMISSION  

Office of Legacy Management (LM)

' ' ATOMIC ENERGY COMMISSION Frank K. Pittman, Director, bivisioa of Waste &&gement and s- portation, Headquarters j CONTAMItUTED RX-AEC-OWNED OR LEASED FACILITIES' This memorandum responds to your TWX certain information on the above subject. the documentation necessary to answer your available due to the records disposal vailing at the time of release or From records that are available and from disc&ions with most familiar with the transfer operations, &have the current radiological conditibn of transferred property is adequate under present standards. The following tabulations follow the format suggested in your TWX and are grouped to an operations or contract r+ponsibility. A,I Ex-AEC Storage Sites - I r:/ National Stockpile Site '(NSS) and OperatEonal

268

Commissioning ATLAS Trigger  

E-Print Network (OSTI)

The ATLAS experiment at the Large Hadron Collider (LHC) will face the challenge of efficiently selecting interesting candidate events in $pp$ collisions at 14 TeV centre-of-mass energy, whilst rejecting the enormous number of background events. Therefore it is equipped with a three level trigger system. The first level is is hardware based and uses coarse granularity calorimeter information and fast readout muon chambers. The second and third level triggers, which are software based, will need to reduce the first level trigger output rate of ~ 75 kHz to ~ 200 Hz written out to mass storage. The progress in commissioning of this system will be reviewed in this paper.

Tomasz Bold; for Atlas Tdaq

2008-10-20T23:59:59.000Z

269

Regulatory guidance document  

SciTech Connect

The Office of Civilian Radioactive Waste Management (OCRWM) Program Management System Manual requires preparation of the OCRWM Regulatory Guidance Document (RGD) that addresses licensing, environmental compliance, and safety and health compliance. The document provides: regulatory compliance policy; guidance to OCRWM organizational elements to ensure a consistent approach when complying with regulatory requirements; strategies to achieve policy objectives; organizational responsibilities for regulatory compliance; guidance with regard to Program compliance oversight; and guidance on the contents of a project-level Regulatory Compliance Plan. The scope of the RGD includes site suitability evaluation, licensing, environmental compliance, and safety and health compliance, in accordance with the direction provided by Section 4.6.3 of the PMS Manual. Site suitability evaluation and regulatory compliance during site characterization are significant activities, particularly with regard to the YW MSA. OCRWM`s evaluation of whether the Yucca Mountain site is suitable for repository development must precede its submittal of a license application to the Nuclear Regulatory Commission (NRC). Accordingly, site suitability evaluation is discussed in Chapter 4, and the general statements of policy regarding site suitability evaluation are discussed in Section 2.1. Although much of the data and analyses may initially be similar, the licensing process is discussed separately in Chapter 5. Environmental compliance is discussed in Chapter 6. Safety and Health compliance is discussed in Chapter 7.

NONE

1994-05-01T23:59:59.000Z

270

NREL: Regulatory Support - Key Activities  

NLE Websites -- All DOE Office Websites (Extended Search)

The Regulatory Support team assists the U.S. Department of Energy by providing regulatory information related to the Energy Policy Act of 1992 and other legislation to help build...

271

ShewRegDB: a Visualization Environment for Integration of Experimental and In Silico Derived Regulatory Information in Shewanella oneidensis MR-1  

Science Conference Proceedings (OSTI)

Shewanella oneidensis MR-1 is an important model organism for environmental research as it has an exceptional metabolic and respiratory versatility regulated by a complex regulatory network. We have developed a database to collect experimental and computational data relating to regulation of gene and protein expression, and, a visualization environment that enables integration of these data types. The regulatory information in the database includes predictions of DNA regulator binding sites, sigma factor binding sites, transcription units, operons, promoters, and RNA regulators including non-coding RNAs, riboswitches, and different types of terminators.

Syed, Mustafa H [ORNL; Karpinets, Tatiana V [ORNL; Leuze, Michael Rex [ORNL; Kora, Guruprasad H [ORNL; Romine, Margaret [Pacific Northwest National Laboratory (PNNL); Uberbacher, Edward C [ORNL

2009-01-01T23:59:59.000Z

272

STATE OF CALIFORNIA THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

Regulatory Commission (FERC) to continue operating its Klamath River Hydroelectric Project, which is located Hydroelectric Project, California Energy Commission Consultant Report, Publication No.700-2006-010, November COMMISSION 1516 NINTH STREET SACRAMENTO, CA 95814-5512 www.energy.ca.gov October 29, 2007 Mr. Paul Clanon

273

Retro-Commissioning (RCx)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Retro-Commissioning Retro-Commissioning (RCx) FUPWG Meeting 20 October, 2010 RCx In UESC Contracts  Put RCx in Delivery Orders  Clear Scope of Work  Specify kW per Ton on Completion  State the Current Condition of the Equipment  State the Expected Performance in the Delivery Orders and Get the Contractor to Agree Up-Front  Don't Hire a Contractor that has Never Done Commissioning  Hire a Commissioning Agent  This Can Be Expensive What We Do at SCE  We Commission Everything  We ReCommission Everything to Some Degree  San Bernardino Story Up Front  You must review and approve the construction scope, budget, and schedule including all RCx activities BEFORE work begins at site  Use Pre-Established Guidelines (FEMP

274

OpenEI - Commission  

Open Energy Info (EERE)

http:en.openei.orgdatasetstaxonomyterm4360 en Alaska Oil and Gas Conservation Commission: February 2011 Drilling & Permit Records http:en.openei.orgdatasetsnode471...

275

NIST Global Standards Information Global Standards News  

Science Conference Proceedings (OSTI)

... 2010 The National Institute of Standards and Technology (NIST) has advised the Federal Energy Regulatory Commission ... DGI), Austin, Texas, were ...

276

Commissioning Process | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Process Process Commissioning Process October 16, 2013 - 4:44pm Addthis The commissioning process is designed to verify that a renewable energy project meets specified agency design, performance, and operational requirements. To ensure that the level and focus of commissioning efforts are appropriate to the scope and complexity of the project, the commissioning planning process should begin at the same time as the design phase of the project. Integrating Commissioning Into the Design Process Developing a Detailed Commissioning Plan Testing Systems and Providing Commissioning Reports Performing Enhanced Commissioning Delivering Final Documentation Integrating Commissioning Into the Design Process The commissioning agent should attend design team meetings, review the

277

Regulatory Uncertainty and Regulatory Scope Thomas P. Lyon  

E-Print Network (OSTI)

, is the shift from municipal to state regulation of natural gas and electricity that occurred in the first in the natural gas industry, and notes that "[S]tate regulatory commissions were less responsive to the demands of local voters and consumers. On average, state regulators tolerated higher gas rates than did local

Lyon, Thomas P.

278

The LHCB Commissioning  

E-Print Network (OSTI)

The LHCb experiment is dedicated to precision measurements of CP violation and rare decays of B hadrons at the Large Hadron Collider (LHC) at CERN. The LHCb installation has been finished in spring 2008 and an intensive testing and commissioning of the system has been started. An overview and the results from our commissioning activities are described.

Stefano de Capua; for the LHCb collaboration

2009-04-28T23:59:59.000Z

279

Commissioning for Federal Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Introduction Introduction Chapter 1 Chapter 1 Introduction Introduction B uilding commissioning has often been likened to commissioning of a ship, where the Owners thor- oughly verify and prove the func- tional performance of all parts - engines, compasses, sonar, radar, radio, generators, potable water systems, and so on - under all pos- sible conditions and as a condition of acceptance before placing the ship in service. And where the Owner checks the presence of sys- tem operating and procedures manuals and the availability of up- to-date navigation charts. And where the crew has been properly and thoroughly trained on the ship's systems' operations and emergency procedures. Commissioning is not new - ships and aircraft have been commissioned for years. Building commissioning has

280

Commissioning for Federal Facilities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Introduction Introduction Chapter 1 Chapter 1 Introduction Introduction B uilding commissioning has often been likened to commissioning of a ship, where the Owners thor- oughly verify and prove the func- tional performance of all parts - engines, compasses, sonar, radar, radio, generators, potable water systems, and so on - under all pos- sible conditions and as a condition of acceptance before placing the ship in service. And where the Owner checks the presence of sys- tem operating and procedures manuals and the availability of up- to-date navigation charts. And where the crew has been properly and thoroughly trained on the ship's systems' operations and emergency procedures. Commissioning is not new - ships and aircraft have been commissioned for years. Building commissioning has

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

EIA Energy Information Administration  

Gasoline and Diesel Fuel Update (EIA)

Gas & Electric Co. filed a request with the Federal Energy Regulatory Commission for emergency price relief from the astronomical prices, asking for a price cap to be imposed...

282

Risk Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants (Cooperative Agreement DE-FC03-99SF21902, Am. M004) Final Technical Report  

SciTech Connect

OAK-B135 Research under this project addresses the barriers to long term use of nuclear-generated electricity in the United States. It was agreed that a very basic and significant change to the current method of design and regulation was needed. That is, it was believed that the cost reduction goal could not be met by fixing the current system (i.e., an evolutionary approach) and a new, more advanced approach for this project would be needed. It is believed that a completely new design and regulatory process would have to be developed--a ''clean sheet of paper'' approach. This new approach would start with risk-based methods, would establish probabilistic design criteria, and would implement defense-in-depth only when necessary (1) to meet public policy issues (e.g., use of a containment building no matter how low the probability of a large release is) and (2) to address uncertainties in probabilistic methods and equipment performance. This new approach is significantly different from the Nuclear Regulatory Commission's (NRC) current risk-informed program for operating plants. For our new approach, risk-based methods are the primary means for assuring plant safety, whereas in the NRC's current approach, defense-in-depth remains the primary means of assuring safety. The primary accomplishments in the first year--Phase 1 were (1) the establishment of a new, highly risk-informed design and regulatory framework, (2) the establishment of the preliminary version of the new, highly risk-informed design process, (3) core damage frequency predictions showing that, based on new, lower pipe rupture probabilities, the design of the emergency core cooling system equipment can be simplified without reducing plant safety, and (4) the initial development of methods for including uncertainties in a new integrated structures-systems design model. Under the new regulatory framework, options for the use of ''design basis accidents'' were evaluated. It is expected that design basis accidents would be an inherent part of the Probabilistic Safety Assessment for the plant and their evaluation would be probabilistic. Other first year accomplishments include (1) the conversion of an NRC database for cross-referencing NRC criteria and industry codes and standards to Microsoft 2000 software, (2) an assessment of the NRC's hearing process which concluded that the normal cross-examination during public hearings is not actually required by the U.S. Administrative Procedures Act, (3) the identification and listing of reliability data sources, and (4) interfacing with other industry groups (e.g., NEI and IAEA) and NRC at workshops for risk-informing regulations. The major accomplishments during the second year consisted of (1) issuance of the final report for Subtask 1.1, ''Identify Current Applicable Regulatory Requirements [and Industry Standards],'' (2) issuance of the final report for Subtask 1.2,'' Identify Structures, Systems, and Components and Their Associate d Costs for a Typical Plant,'' (3) extension of the new, highly risk-informed design and regulatory framework to non-light-water-reactor technology, (4) completion of more detailed thermal-hydraulic and probabilistic analyses of advanced conceptual reactor system/component designs, (6) initial evaluation and recommendations for improvement of the NRC design review process, and (7) initial development of the software format, procedures and statistical routines needed to store, analyze and retrieve the available reliability data. Final reports for Subtasks 1.1 (regulatory and design criteria) and 1.2 (costs for structures, systems, and components) were prepared and issued. A final report for Subtask 1.3 (Regulatory Framework) was drafted with the aim to issue it in Phase 3 (Year 3). One technical report was produced for Subtask 1.4 (methods development) and two technical reports were produced for Subtask 1.6 (sample problem analysis). An interim report on the NRC design review process (Subtask 1.7) was prepared and issued. Finally, a report on Subtask 2.2 (database weaknesses) addressed the i

Stanley E. Ritterbusch, et. al.

2003-01-29T23:59:59.000Z

283

Automated Demand Response and Commissioning  

E-Print Network (OSTI)

Conference on Building Commissioning: May 4-6, 2005 Motegi,National Conference on Building Commissioning: May 4-6, 2005Demand Response and Commissioning Mary Ann Piette, David S.

Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Bourassa, Norman

2005-01-01T23:59:59.000Z

284

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

California Energy Commission STAFF REPORT SUMMER 2010 ELECTRICITY SUPPLY AND DEMAND OUTLOOK MAY Supply and Demand Outlook provides a summary of the California Energy Commission staff assessment. Summer 2010 Electricity Supply and Demand Outlook. California Energy Commission, Electricity Supply

285

CMAD IV 11/14/96 Information Security  

E-Print Network (OSTI)

utilities, power pools, vendors etc.. #12;CMAD IV 11/14/96 #12; #12; GridCo LineCo PoolCo Energy Merchant INFO INFO INFO $ $ $ PWR PWR PWR #12;CMAD IV 11/14/96 "Future" Is At Hand · Federal Energy Regulatory Commission (FERC) 889 ­ information on transmission availability and prices. ­ equal access for wholesale

California at Davis, University of

286

The California Sentencing Commission  

E-Print Network (OSTI)

The California Sentencing Commission: Laying the Groundwork Sponsored by The Stanford Executive alexander, Executive Vice President, California Correctional and Peace Officers Association Laura appleman Project, The Pew Charitable Trusts Joyce Hayhoe, Assistant Secretary, Office of Legislation, California

Ford, James

287

Codex Alimentarius Commission update  

Science Conference Proceedings (OSTI)

AOCS Technical Director Richard Cantrill attended recent meetings of two Codex Alimentarius Commission (Codex) committees that deal with issues of interest to the fats and oils industry. Topics discussed included work to update the standard on named vegeta

288

The SNS RFQ Commissioning  

E-Print Network (OSTI)

THE SNS RFQ COMMISSIONING * A. Ratti, J. Ayers, L.Spallation Neutron Source (SNS ** ) project a 402.5 MHz RFQR. Keller et al, Status of the SNS Font End Systems, Proc.

2002-01-01T23:59:59.000Z

289

Regulatory Reform and License Termination Planning in Decommissioning  

SciTech Connect

Decommissioning of commercial nuclear power plants (NPPs) must be safe and cost-effective and consider the needs of a wide range of stakeholders. The creative tension among these objectives has provided opportunities to reform the way these plants are regulated and managed in decommissioning. Enlightened and visionary leaders from the U.S. Nuclear Regulatory Commission (NRC) and industry are seizing these opportunities to create new paradigms for risk-informed regulation; creative stakeholder involvement; and effective, end-state focused, license termination planning.

Michael J. Meisner

2000-06-04T23:59:59.000Z

290

Chapter 9: Commissioning the Building  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: : Commissioning the Building Commissioning Process Overview Commissioning Activities and Documentation LANL | Chapter 9 Commissioning the Building Commissioning Process Overview Commissioning is a process - a systematic process of ensuring that a building performs in accordance with the design intent, contract documents, and the owner's operational needs. Commissioning is fundamental to the success of the whole-building design process. Due to the sophistication of building designs and the com- plexity of building systems constructed today, commis- sioning is necessary, but not automatically included as part of the typical design and contracting process. Commissioning is critical for ensuring that the building design is successfully constructed and operated.

291

Automated Demand Response and Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

and Commissioning Title Automated Demand Response and Commissioning Publication Type Conference Paper LBNL Report Number LBNL-57384 Year of Publication 2005 Authors Piette, Mary...

292

Federal Energy Management Program: Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

commissioning projects. Commissioning training is also available through FEMP. The on-demand training outlines processes to resolve operating problems, improve comfort,...

293

Commission ushers in new era in Mexican gas industry  

Science Conference Proceedings (OSTI)

Transportation and distribution of natural gas in Mexico are undergoing fundamental changes as a result of the 1995 passage by the Congress of Mexico of the law that created the Energy Regulatory Commission (Comision Reguladora de Energia--CRE). The law mandates that the commission must achieve a competitive, efficient, safe, and sustainable gas industry, allowing the country to make the difficult energy transition to open gas and electricity markets relying on cleaner fuels. The paper discusses the situation before CRE, the regulatory framework, market development, and the North American market.

Monteforte, R. [Energy Regulatory Commission of Mexico, Mexico City (Mexico)

1998-04-06T23:59:59.000Z

294

INITIAL COMMISSIONING OF NDCX-II  

E-Print Network (OSTI)

INITIAL COMMISSIONING OF NDCX-II* S. Lidia # , D. Arbelaez,the results of early commissioning studies that characterizeschematic and commissioning phases. The commissioning phases

Lidia, S.

2013-01-01T23:59:59.000Z

295

FOR FURTHER INFORMATION CONTACT:  

E-Print Network (OSTI)

SUMMARY: The Federal Energy Regulatory Commission modifies its regulations requiring major non-interstate pipelines to post daily scheduled volume information and other data for certain points. These modifications include a requirement that major noninterstate pipelines post information for receipt and delivery points at which design capacity is unknown. The Commission denies requests to revise its regulations requiring interstate natural gas pipelines to post information regarding the provision of no-notice service. The posting requirements will facilitate price transparency in markets for the sale or transportation of physical natural gas in interstate commerce to implement section 23 of the Natural Gas Act, 15 U.S.C. 717t-2 (2000 & Supp. V 2005). EFFECTIVE DATE: This rule will become effective [insert date 30 days after publication in the FEDERAL REGISTER].20100121-3044 FERC PDF (Unofficial) 01/21/2010 Docket No. RM08-2-001 2

Steven Reich (technical; Gabe S. Sterling (legal

2010-01-01T23:59:59.000Z

296

The Paradox of Regulatory Development in China: The Case of the Electricity Industry  

E-Print Network (OSTI)

zhongguo dianli chanye (Chinas Electricity Industry at themulti_page.pdf. State Electricity Regulatory Commission.The Annual Report on Electricity Regulation (2006). Beijing:

Tsai, Chung-min

2010-01-01T23:59:59.000Z

297

Information Update: June 24, 2008 Plutonium Discharge into ...  

Science Conference Proceedings (OSTI)

... of a National Nuclear Security Administration (NNSA ... inspector from the Nuclear Regulatory Commission ... occupants, the public and the environment. ...

2010-10-05T23:59:59.000Z

298

Commissioning Team | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commissioning Team Commissioning Team Commissioning Team October 16, 2013 - 4:45pm Addthis Assembling a committed team is a critical part of the commissioning process for renewable energy projects. Members of the team vary based on the size, complexity, and funding mechanism used for the project at hand. The commissioning team lead is a commissioning agent, an independent agent representing the agency's interests. In addition to the commissioning agent, participants in the commissioning process can include the agency, operations and management (O&M) personnel, contractors, subcontractors, and the architectural and engineering (A&E) firm. The project energy lead should also be an active member of the commissioning team and work closely with the commissioning agent. Renewable energy projects often require a team of experts in specific

299

Tracking the Reliability of the U.S. Electric Power System: An Assessment of Publicly Available Information Reported to State Public Utility Commissions  

E-Print Network (OSTI)

Analysis Working Group District of Columbia U.S. Department of Energy Energy Information Administration Institute of Electrical and

LaCommare, Kristina H.

2008-01-01T23:59:59.000Z

300

ATF2 Commissioning  

Science Conference Proceedings (OSTI)

ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

Seryi, A.; /SLAC; Christian, G.; /KLTE-ATOMKI; Parker, B.; /BNL; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; /CERN; Wolski, A.; Elsen, E.; /Cockcroft Inst. /DESY; Sanuki, T.; /Tohoku U.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; /Fermilab; Takahashi, T.; /Hiroshima U.; Bai, S.; Gao, J.; /Beijing, Inst. High Energy Phys.; Bolzon, B.; Geffroy, N.; Jeremie, A.; /Annecy, LAPP; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

2009-10-30T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Commissioning Guidance for ESPCs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7.2 7.2 Commissioning Guide Commissioning Guidance for ESPCs INTRODUCTION Federal facility managers are challenged daily with maintaining existing federal building stock that is energy inefficient, requires increasing operations and maintenance (O&M) expenses, and often does not achieve the building occupant comfort needed to maintain worker productivity. Additionally, they are faced with congressionally mandated requirements to reduce energy use and O&M expenses, with little capital funding. The Super ESPC program provides a procurement mechanism to allow agencies to acquire performance-based services to implement energy efficient equipment and systems that reduce energy use and O&M expenses through projects designed, installed, financed, and

302

ATLAS Muon Detector Commissioning  

E-Print Network (OSTI)

The ATLAS muon spectrometer consists of several major components: Monitored Drift Tubes (MDTs) for precision measurements in the bending plane of the muons, supplemented by Cathode Strip Chambers (CSC) in the high eta region; Resistive Plate Chambers (RPCs) and Thin Gap Chambers (TGCs) for trigger and second coordinate measurement in the barrel and endcap regions, respectively; an optical alignment system to track the relative positions of all chambers; and, finally, the world's largest air-core magnetic toroid system. We will describe the status and commissioning of the muon system with cosmic rays and plans for commissioning with early beams.

E. Diehl; for the ATLAS muon collaboration

2009-10-15T23:59:59.000Z

303

Building commissioning: The key to quality assurance  

SciTech Connect

This Guide is written to aid building owners and retrofit project managers currently participating in the Rebuild America program. The Guide provides information on implementing building commissioning projects that will optimize the results of existing building equipment improvements and retrofits projects. It should be used in coordination with Rebuild America`s Community Partnership Handbook. The Handbook describes, in detail, eight important steps necessary for planning and carrying out a community-wide energy-efficiency program. In step number 7 of the Handbook, commissioning is shown to be an integral aspect of implementing a building retrofit. The commissioning process ensures that a facility is safe, efficient, comfortable, and conducive to the presumed activities for which it was constructed. Rebuild America strongly encourages its partners to incorporate commissioning into their retrofit projects. By verifying the correct installation, functioning, operation, and maintenance of equipment, the commissioning process ensures that efficiency measures will continue to deliver benefits over the long term. Although commissioning can take place after the equipment has been installed, it is more effective when it takes place over the entire equipment installation process.

1998-05-01T23:59:59.000Z

304

COMMISSION GUIDEBOOK RENEWABLES PORTFOLIO  

E-Print Network (OSTI)

Commission's system for tracking and verifying compliance with the RPS. Keywords biodiesel, biogas, biomass of biomass or biogas fuels. In addition, Section 399.12, Subdivision (g)(3), specifies that no electricity that uses a mix of natural gas and biogas injected into a gas transportation pipeline. Once WREGIS

305

o:\informs\fixforms\nrc742c.wpf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. TOTALS . TOTALS U.S. DEPARTMENT OF ENERGY AND U.S. NUCLEAR REGULATORY COMMISSION PHYSICAL INVENTORY LISTING DOE/NRC FORM 742C (8-2003) MANDATORY DATA COLLECTION AUTHORIZED BY 10 CFR 30, 40, 50, 70, 72, 74, 75, 150, Public Laws 83-703, 93-438, 95-91 8. BATCH DATA of Page Estimated burden per response to comply with this mandatory collection request: 6 hours. This information is required by NRC to fulfill its safeguards responsibilities, bilateral agreements, and responsibilities as a participant in the US/IAEA Safeguards Agreement. Send comments regarding burden estimate to the Records Management Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

306

Requirements for Commissioning HVAC Systems Using BEMS and Commissioning the BEMS Itself Based on Questionnaire Surveys  

E-Print Network (OSTI)

In this paper the present status and requirements for commissioning of HVAC Systems using Building Energy Management Systems (BEMS) and commissioning the BEMS itself are investigated and summarized. The information presented is based on the results of the questionnaire and interview survey of experts which was carried out in four countries; Japan, the USA, France and Canada. This paper intends to clarify the requirements and future scope of the above issues by analyzing similarities and differences between the countries.

Yoshida, H.; Vaezi-Nejad, H.; Choiniere, D.; Wang, F.

2004-01-01T23:59:59.000Z

307

Ontology Development for Low-Energy Building Embedded Commissioning  

E-Print Network (OSTI)

This paper presents the results of initial work in developing an ontology for improving information exchange and automation in building system commissioning practices. In our previous research dealing with the derivation of product models from building commissioning process models, we found that there is a need to categorize and classify information items, which are available in commissioning process descriptions. In addition, the relationship between these items should be clearly defined to establish a topological relationship between items necessary for specifying product models. Ontology development is the way to categorize and classify domain knowledge information and items into inter-related concepts. Ontology assembles information in the form of concept hierarchies (taxonomies), axioms, and semantic relationships, which allow natural language to be presented unambiguously. A glossary (a lower form of ontology) specific to building commissioning tasks was developed as a first step. In the second step, an ontology for use in commissioning software applications was developed.

Lee, K. J.; Akin, O.; Akinci, B.; Garrett, J.; Bushby, S.

2009-11-01T23:59:59.000Z

308

Confidential data in a competitive utility environment: A regulatory perspective  

SciTech Connect

Historically, the electric utility industry has been regarded as one of the most open industries in the United States in sharing information but their reputation is being challenged by competitive energy providers, the general public, regulators, and other stakeholders. As the prospect of competition among electricity power providers has increased in recent years, many utilities have been requesting that the data they submit to their utility regulatory commissions remain confidential. Withholding utility information from the public is likely to have serious and significant policy implications with respect to: (1) consumer education, the pursuit of truth, mutual respect among parties, and social cooperation; (2) the creation of a fair market for competitive energy services; (3) the regulatory balance; (4) regional and national assessments of energy-savings opportunities; (5) research and development; and (6) evaluations of utility programs, plans, and policies. In a telephone survey of all public utility commissions (PUCs) that regulate electric and gas utilities in the U.S., we found that almost all PUCs have received requests from utility companies for data to be filed as confidential, and confidential data filings appear to have increased (both in scope and in frequency) in those states where utility restructuring is being actively discussed. The most common types of data submitted as confidential by utilities dealt with specific customer data, market data, avoided costs, and utility costs.

Vine, E.

1996-08-01T23:59:59.000Z

309

STATE OF CALIFORNIA THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

Acting Secretary Federal Energy Regulatory Commission 888 First Street NE ­ Room 1A Washington, DC 20246STATE OF CALIFORNIA ­ THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA ENERGY COMMISSION 1516 NINTH STREET SACRAMENTO, CA 95814-5512 www.energy.ca.gov April 19, 2007 Ms. Philis Posey

310

The California Energy Commission and Its Programs  

E-Print Network (OSTI)

supply of competitively priced energy. The state is a world leader in energy research and development energy supply/demand and keeping historical energy data. · Licensing and monitoring the constructionThe California Energy Commission and Its Programs A Public Information Guide Prepared by the Public

311

California Energy Commission GUIDANCE ON WASTE  

E-Print Network (OSTI)

California Energy Commission GUIDANCE GUIDANCE ON WASTE MANAGEMENT PLANS FOR ENERGY EFFICIENCY passed upon the accuracy or adequacy of the information in this report. #12;GUIDANCE ON WASTE MANAGEMENT) obtain waste management plans for each proposed project receiving funding under the Energy Efficiency

312

New Forestry Commission District Office The new Forestry Commission  

E-Print Network (OSTI)

New Forestry Commission District Office The new Forestry Commission District office at Smithton in construction The Forestry Commission's District office at Smithton in Inverness, Scotland, covers the national fuel heating system has proved effective during the winter of 2009/10, one of the harshest in 40 years

313

Guidelines for Preparing Risk-Informed Graded Quality Assurance Program Implementation Request Submittals  

Science Conference Proceedings (OSTI)

EPRI has assessed the role of probabilistic risk assessment (PRA) in the regulation of nuclear power plant quality assurance programs. This report presents nuclear utilities with one example of a methodology and formatting guidance for developing submittals to the U.S. Nuclear Regulatory Commission (NRC) requesting implementation of risk-informed, performance-based "graded" quality assurance programs.

1998-10-28T23:59:59.000Z

314

Commissioning : The Total Process  

E-Print Network (OSTI)

In recent years, most new buildings have been equipped with increasingly sophisticated heating, ventilating, and air-conditioning (HVAC) systems, energy conservation equipment, lighting systems, security systems, and environmental control devices that rely on electronic control. Very frequently these systems and design features have not performed as expected. This can result in energy-efficiency losses. occupant complaints about comfort, indoor air quality problems. high operating costs, and increased liability for building owners, operators, employers, and design professionals. Building commissioning was developed in response to these concerns. Commissioning involves the examining and testing of building systems to verify aspects of the building design, ensure that the building is constructed in accordance with the contract documents, and verify that the building and its systems function according to the design intent documents. The process helps to integrate and organize the design, construction, operations, and maintenance of a building's systems to produce a healthy, comfortable, and efficient facility.

Kettler, G. J.

1998-01-01T23:59:59.000Z

315

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM OVERALL PROGRAM GUIDEBOOK Fourth Edition Manager Renewable Energy Office G. William Pennington Acting Deputy Director Efficiency and Renewable of how the Energy Commission's Renewable Energy Program is administered and outlines terms

316

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

California Energy Commission STAFF REPORT SUMMER 2012 ELECTRICITY SUPPLY ABSTRACT The Summer 2012 Electricity Supply and Demand Outlook is the California Energy and Demand Outlook. California Energy Commission, Electricity Supply Analysis Division. CEC-200

317

Regulatory Resources for Process Contaminants (3-MCPD)  

Science Conference Proceedings (OSTI)

Regulatory information and references for 3-MCPD(3-Monochloropropane-1,2-diol )process contaminants. Regulatory Resources for Process Contaminants (3-MCPD) 3-MCPD 2-diol 3-MCPD 3-MCPD Esters 3-monochloropropane-1 acid analysis aocs april articles certifi

318

Commissioning of the ATLAS Pixel Detector  

E-Print Network (OSTI)

The ATLAS pixel detector is a high precision silicon tracking device located closest to the LHC interaction point. It belongs to the first generation of its kind in a hadron collider experiment. It will provide crucial pattern recognition information and will largely determine the ability of ATLAS to precisely track particle trajectories and find secondary vertices. It was the last detector to be installed in ATLAS in June 2007, has been fully connected and tested in-situ during spring and summer 2008. It is currently in a commissioning phase using cosmic-ray events. We present the highlights of the past and future commissioning activities of the ATLAS pixel system.

J. -F. Arguin; for the ATLAS Pixel Collaboration

2008-10-16T23:59:59.000Z

319

A Guide to Building Commissioning  

SciTech Connect

Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

Baechler, Michael C.

2011-09-01T23:59:59.000Z

320

A Guide to Building Commissioning  

SciTech Connect

Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

Baechler, Michael C.

2011-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

A New Commissioning and Deployment Method for Wireless Sensor Networks  

Science Conference Proceedings (OSTI)

Sensor networks are deployed on various environments in order to collect sensing information in many cases. It is not easy to optimize program codes of all nodes due to the environmental variety of deployment of sensor networks. Therefore, commissioning ... Keywords: sensor network, commissioning, ZigBee, network deployment

Bong Wan Kim; Seong-Soon Joo

2009-10-01T23:59:59.000Z

322

TATE OF CALIFORNI ENERGY COMMISSION  

E-Print Network (OSTI)

of concentrator photovoltaic systems must provide acceptable evidence to the Energy Commission for each modelS TATE OF CALIFORNI A ENERGY COMMISSION Pete Wilson, Governor CALIFORNIA ENERGY COMMISSION January Charles Mizutani, Manager TECHNOLOGY EVALULATION OFFICE Nancy J. Deller, Deputy Director ENERGY TECHNOLOGY

323

Let the People Know the Facts: Can Government Information Removed From the Internet Be Reclaimed?  

E-Print Network (OSTI)

Energy Regulatory Commissions (FERC) reconsideration of itswww.ombwatch.org/article/articleview/213/1/104/#FERC (FERC removes documents). Fed. Regulatory Energy Commn, How-

Mart, Susan Nevelow

2005-01-01T23:59:59.000Z

324

Automated Continuous Commissioning of Commercial Buildings  

E-Print Network (OSTI)

Conference on Building Commissioning. San Francisco, CA. 17.Commercial Buildings Commissioning, LBNL- 56637, Nov. 2004.Automated Continuous Commissioning Tool GUI Screenshots from

Bailey, Trevor

2013-01-01T23:59:59.000Z

325

Commissioning of the ATLAS pixel detector  

E-Print Network (OSTI)

Commissioning of the ATLAS pixel detector Tobias GollingUniversity of California. Commissioning of the ATLAS pixelof the past and future commissioning activities of the ATLAS

Golling, Tobias; ATLAS Collaboration

2009-01-01T23:59:59.000Z

326

Installation and Commissioning Automated Demand Response Systems  

E-Print Network (OSTI)

al: Installation and Commissioning Automated Demand ResponseConference on Building Commissioning: April 22 24, 2008al: Installation and Commissioning Automated Demand Response

Kiliccote, Sila; Global Energy Partners; Pacific Gas and Electric Company

2008-01-01T23:59:59.000Z

327

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

NLE Websites -- All DOE Office Websites (Extended Search)

water temperatures between 10C (50F) to 26C (79F). The southern boundary is the United States-Mexico maritime boundary. The northern boundary is defined as the position...

328

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

NLE Websites -- All DOE Office Websites (Extended Search)

response); Rate Schedule CV-SPR4 (spinning reserves); Rate Schedule CV-SUR4 (supplemental reserves); Rate Schedule CV-EID4 (energy imbalance service); and Rate Schedule...

329

Federal Energy Regulatory Commission Order on Plan for California...  

NLE Websites -- All DOE Office Websites (Extended Search)

L. Massey, Linda Breathitt, Pat Wood III, and Nora Mead Brownell. San Diego Gas & Electric Company, Complainant, v. Docket No. EL00-95-031 Sellers of Energy and Ancillary...

330

The Federal Energy Regulatory Commission Leased Warehouse Space...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy's Warehouse Space, CR-B-97-01 Audit of Department of Energy's Contractor Salary Increase Funds, CR-B-97-02 Audit of Department of Energy Support Service Contracting,...

331

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy -- Docket No. EF11-9-000 Western Area Power Administration (Central Valley Project, California-Oregon Transmission Project, and Pacific Alternating Current...

332

Nuclear Regulatory Commission issuances, July 1996: Volume 44, No. 1  

Science Conference Proceedings (OSTI)

This report includes the issuances received during this period from NRC, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking.

NONE

1996-07-01T23:59:59.000Z

333

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

NLE Websites -- All DOE Office Websites (Extended Search)

explorer-Fish. Available at: http:www.umpquaexplorer.infotopicstopics.aspx?Res9977&subcatFish&Le v2&zrid9&coid9977. Accessed April 2007. 257 OSU and Oregon DOGAMI...

334

Department of Energy Commends the Nuclear Regulatory Commission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2007 - 12:10pm Addthis The Entergy Corporation's Grand Gulf Site in Mississippi Receives NRC Approval for an ESP WASHINGTON, DC - The U.S. Department of Energy (DOE) today...

335

U.S. NUCLEAR REGULATORY COMMISSION Revision 1 February 1996  

E-Print Network (OSTI)

From Table 3.1 in NUREG-0713 (Ref. 9). 17. How do I know how much my occupational dose (exposure) is? If you

Meagher, Mary

336

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

NLE Websites -- All DOE Office Websites (Extended Search)

9. The Cobscook Bay Project will use the tidal currents of Cobscook Bay to generate electricity via cross-flow Kinetic System turbine generator units (TGUs) mounted on the...

337

Nuclear Regulatory Commission Proceedings: A Guide for Intervenors  

E-Print Network (OSTI)

licensing boards to limit cross-examination and oral argu-oral testimony is also important, because it is relied upon by the licensing board

Hansell, Dean

1982-01-01T23:59:59.000Z

338

UNITED STATES NUCLEAR REGULATORY COMMISSION WAWINGTON. D. C....  

Office of Legacy Management (LM)

WAWINGTON. D. C. 20555 kpartmnt of Energy Al7N: Dr. W illiam E. Mott. Director Environmental and Safety Engineering Division (EP-32) Washington, D.C. 20545 Dear Dr. kbtt: Enclosed...

339

Nuclear Regulatory Commission Proceedings: A Guide for Intervenors  

E-Print Network (OSTI)

Workers, 367 U.S. 396 (1961); Vermont Yankee, 435 U.S. 519;in two 2. See, e.g. , Vermont Yankee Nuclear Power Corp. v.1143 (8th Cir. 1971); and Vermont Yankee Nuclear Power Corp.

Hansell, Dean

1982-01-01T23:59:59.000Z

340

Nuclear Regulatory Commission's Integrated Strategy for Spent Fuel Management  

Energy.gov (U.S. Department of Energy (DOE))

20+ years of preparation for the licensing review DOE application received in June 2008 and accepted for review in September 2008 President Obama pursues alternatives to Yucca Mountain DOE...

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

UNITED STATES NUCLEAR REGULATORY COMMISSION WAWINQTON, 0. C....  

Office of Legacy Management (LM)

WAWINQTON, 0. C. ZOSSS Hr. Ray Cooperstein Nuclear Environmental Department ,of Energy Germantown..Haryland fl Stop E-201 Dear Hr. Cooperstein: Application Branch ;;;osed please...

342

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

NLE Websites -- All DOE Office Websites (Extended Search)

Service GRP Glass Reinforced Plastic GWh gigawatt-hour HDD horizontal directional drilling vii HIRA Hazard Identification and Risk Assessment Hz hertz IHA incidental...

343

GRR/Section 7-CA-a - State Plant Commissioning Process, Application for  

Open Energy Info (EERE)

GRR/Section 7-CA-a - State Plant Commissioning Process, Application for GRR/Section 7-CA-a - State Plant Commissioning Process, Application for Certification < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-CA-a - State Plant Commissioning Process, Application for Certification 07CAAPlantCommissioningProcessApplicationForCertification.pdf Click to View Fullscreen Contact Agencies California Energy Commission Regulations & Policies Warren-Alquist Act California Code of Regulations, Title 20 - Public Utilities and Energy Triggers None specified Click "Edit With Form" above to add content 07CAAPlantCommissioningProcessApplicationForCertification.pdf 07CAAPlantCommissioningProcessApplicationForCertification.pdf Error creating thumbnail: Page number not in range.

344

Commissioning Process | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commissioning Process Commissioning Process Commissioning Process October 7, 2013 - 9:19am Addthis The commissioning process for Federal facilities generally follows a four-step process. This process holds true across all forms of commissioning and for both new and existing buildings. Step 1: Planning The planning step includes developing and agreeing upon the overall commissioning objectives and strategies, assembling the project team, and compiling and perusing building and equipment documentation. Objectives for this step include: Optimizing building operations to reduce operating costs Addressing complaints from occupants regarding air quality or comforts Creating a model facility Improving facility operations and maintenance (O&M) and reducing emergency calls. When forming the commissioning team, considerations could include

345

Colorado - U.S. Energy Information Administration (EIA) - U.S ...  

U.S. Energy Information Administration (EIA)

Wind Geothermal ... Colorado Department of Regulatory Agencies, Public Utilities Commission; Colorado Department of Human Services, Energy Assistance;

346

o:\informs\fixforms\nrc742_3.wpf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MATERIAL TYPE MATERIAL TYPE (Submit separate report for each type) U.S. DEPARTMENT OF ENERGY AND U.S. NUCLEAR REGULATORY COMMISSION MATERIAL BALANCE REPORT 1. NAME AND ADDRESS MATERIAL ACCOUNTABILITY NRC FORM 742 (8-2003) (PREVIOUS EDITIONS ARE OBSOLETE) 4. REPORT PERIOD (MM/DD/YYYY) PRINTED ON RECYCLED PAPER Estimated burden per response to comply with this mandatory collection request: 5 hours. Reported lessons learned are incorporated into the licensing process and fed back to industry. Send comments regarding burden estimate to the Records Management Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0004),

347

Regulatory Tools  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Tools Regulatory Tools Home CRA - 2004 Final Recertification Decision CRA Comments & Responses CCA - 1996 CRA CARDs & TSDs CCA CARDs & TSDs Regulatory Tools Title 40 CFR Part 191 Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes. Title 40 CFR Part 194 Criteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations. Part I Title 40 CFR Part 194 Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations; Alternative Provisions; Proposed Rule. Friday August 9, 2002. Part II Title 40 CFR Part 194 Criteria for the Certification and Recertification of the Waste Isolation Pilot Plant's Compliance With the Disposal Regulations: Certification Decision; Final Rule. May 18, 1998. Part III

348

Low Dose Radiation Program: Links - Agencies with Radiation Regulatory  

NLE Websites -- All DOE Office Websites (Extended Search)

Agencies with Radiation Regulatory Concerns and Involvement Agencies with Radiation Regulatory Concerns and Involvement Biological Effects of Low Level Exposures (BELLE) Canadian Nuclear Safety Commission Center for Risk Excellence Health Protection Agency The Health Risks of Extraterrestrial Environments International Commission on Radiation Units and Measurements, Inc. International Commission on Radiological Protection (ICRP) International Radiation Protection Association (IRPA) NASA Space Radiation Program National Academy of Sciences (NAS) Nuclear and Radiation Studies Board National Aeronautics and Space Administration (NASA) NASA OBRR Task Book Publication National Council on Radiation Protection (NCRP) National Institute of Environmental Health Sciences (NIEHS) National Toxicology Program (NTP) Occupational Safety and Health Administration (OSHA)

349

Regulatory overview  

Science Conference Proceedings (OSTI)

The end of 2012 and beginning of 2013 was a busy time for US regulators and standard-setters as two regulations and one consensus standard made the news. All have implications for oilseed processing and edible oil refining. Regulatory overview Public

350

Commissioning a materials research laboratory  

DOE Green Energy (OSTI)

This presentation covers the process of commissioning a new 150,000 sq. ft. research facility at Sandia National Laboratories. The laboratory being constructed is a showcase of modern design methods being built at a construction cost of less than $180 per sq. ft. This is possible in part because of the total commissioning activities that are being utilized for this project. The laboratory's unique approach to commissioning will be presented in this paper. The process will be followed through from the conceptual stage on into the actual construction portion of the laboratory. Lessons learned and cost effectiveness will be presented in a manner that will be usable for others making commissioning related decisions. Commissioning activities at every stage of the design will be presented along with the attributed benefits. Attendees will hear answers to the what, when, who, and why questions associated with commissioning of this exciting project.

SAVAGE,GERALD A.

2000-03-28T23:59:59.000Z

351

Commissioning Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Checkout, Testing, and Checkout, Testing, and Commissioning Plan Review Module March 2010 CD-0 O Ch 0 OFFICE OF heckout, T C CD-1 F ENVIRON Standard R Testing, a Revi Critical Decis CD-2 Ma NMENTAL Review Plan and Com iew Module sion (CD) Ap CD arch 2010 L MANAGE n (SRP) mmissioni e pplicability D-3 EMENT ing Plan CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

352

CRE_Response-DOE_Regulatory_Review_Request_for_Comments.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Center for Regulatory Effectiveness Center for Regulatory Effectiveness 1601 Connecticut Avenue, N.W. Washington, DC, 20009 Tel: (202) 265-2383 Fax: (202) 939-6969 secretary1@mbsdc.com www.TheCRE.com 1 REGULATORY REVIEW MEMORANDUM To: Department of Energy From: Jim Tozzi Subject: Regulatory Burden Request for Information Date: September 4, 2012 CC: Boris Bershteyn/Office of Information and Regulatory Affairs This Memorandum serves as an Executive Summary of Center for Regulatory Effectiveness' (CRE's) attached comments highlighting four issues: 1. DOE's Regulatory Coordination & Harmonization Responsibilities; 2. The Cumulative Costs of Regulations; 3. Retrospective Review of Regulations; and 4. Stakeholder Participation. DOE REGULATORY COORDINATION & HARMONIZATION RESPONSIBILITIES

353

February 2008 In 2003, the California Public Utilities Commission, the California Energy Commission, and the California  

E-Print Network (OSTI)

prepared the update using the information and analysis prepared for the recent IEPR, as well as recent· Renewable energy· Electricity reliability and infrastructure· Electricity market structure· Natural gas#12;February 2008 In 2003, the California Public Utilities Commission, the California Energy

354

PRELIMINARY Run Shutdown BL Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

PRELIMINARY Run Shutdown BL Commissioning Maintenance AP SPEAR Down Injector Startup University Holidays Spear Down SPEAR Startup MA Sep Oct 2011 2012 MA Mar Apr May Jun Jul...

355

Beamline Commissioning Readiness Review Team  

NLE Websites -- All DOE Office Websites (Extended Search)

Readiness Review Team (BCRRT) 1. Purpose The APS Beamline Commissioning Readiness Review Team (BCRRT) reports to and advises the AES Associate Division Director for Mechanical and...

356

Beamline Commissioning Readiness Review Team  

NLE Websites -- All DOE Office Websites (Extended Search)

AES AES CCSM & BCRRT Chair J. Vacca AES RSO-Health Physicist W. VanWingeren AES AES Commissioning Coordinator Floor Coordinator AES Beamline Operations Support Beamline Staff...

357

Electric Restructuring Outreach Activities and Information Dissemination to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Restructuring Outreach Activities and Information Restructuring Outreach Activities and Information Dissemination to State Public Utility Regulators Electric Restructuring Outreach Activities and Information Dissemination to State Public Utility Regulators Provide policy development, and direct educational and technical assistance to state utility commissions on electric restructuring issues focusing on energy efficiency, renewable energy resource and distributed technology deployment. In providing informational outreach and technical assistance to states, RAP will specifically advance those regulatory and policy approaches which most effectively advance energy efficiency, renewable energy resource and distributed technology deployment. Electric Restructuring Outreach Activities and Information Dissemination to

358

International Electrotechnical Commission IEC 61850 Substation Development  

Science Conference Proceedings (OSTI)

The International Electrotechnical Commission Standard IEC 61580 is an emerging standard for advanced utility automation that provides a rich, hierarchical data and behavior model for use in sophisticated substation control and protection equipment. One of the important features introduced by IEC 61850 is the replacement of the wires used to exchange binary and analog information between Intelligent Electronic Devices (IEDs) with communication messages. In a conventional substation, the substation engine...

2009-03-25T23:59:59.000Z

359

The Theory and Practice of Decoupling  

E-Print Network (OSTI)

markets. The Federal Energy Regulatory Commission (FERC) gathers informationmarkets. The Federal Energy Regulatory Commission (FERC) gathers information

Eto, J.H.

2010-01-01T23:59:59.000Z

360

The California Energy Commission's geothermal activities  

SciTech Connect

Thank you for the invitation to participate in this distinguished gathering. I would like to briefly relate the interests of the California Energy Commission in geothermal energy. Geothermal energy is a basic component of many of our primary activities, and is expressly cited in our statutory authority, the Warren-Alquist Act (1974). Our mandates affect the geothermal industry both directly and indirectly. The Commission is responsible for 5-, 12-, and 20-year forecasts of California electricity supply and demand. These forecasts are reported in our biennial Electricity Report. These forecasts are used in various official regulatory proceedings. The primary use is in the Commission's power plant siting authority. The forecasts establish the base used to determine the need for new capacity and energy in the current planning period. The forecasts are also used in other Commission activities as well as in proceedings at the Public Utilities Commission. The 1990 Electricity Report represents a dramatic change in the way this agency balances the relative importance of price competition, environmental quality, demand management as a system resource, and the implications of continued reliance on natural gas. Generally, the Commission is grappling with the elusive and complex problems of quantifying the appropriate value to assign to external (i. e., non-market) environmental attributes of competing technologies. While we have not decisively established such values, we do believe that they do exist and that we are moving in the right direction. The adopted policies have positive long term implications for geothermal and the other renewable technologies. The Commission has been in existence since 1975 and during that time has seen the development of geothermal energy in several areas of the state. As a regulatory agency, we have authority over the construction of thermal electric plants over 50 megawatts (MW). To date the Commission has certified the construction of more than 1200 MW in the Geysers. This area is now experiencing a dramatic loss in productivity. The Commission is engaged in a cooperative effort with the parties operating in the Geysers to address the problem of resource productivity. We held a hearing to examine the causes of the decline of the geothermal steam resources and its affect on electric energy supply. An outcome of the hearing was the establishment of a Technical Advisory Committee with the responsibility of providing the Commission projections of capacity and energy under the current rates of steam decline. The Committee was also charged with examining options on efficient resource management, including research and development, testing, and analyses regarding reservoir and power plant operations.

Crowley, Barbara

1991-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network (OSTI)

CRT DC DSM EHV ESI FACTS FERC GIS HHI IEC IEPR IID IOU IPPEnergy Regulatory Commission (FERC), followed by Californiacase of municipal utilities). FERC authorizes tariffs for

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

362

Comments of the District of Columbia Public Service Commission | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of the District of Columbia Public Service Commission of the District of Columbia Public Service Commission Comments of the District of Columbia Public Service Commission Docket No. EO-05-01: Pursuant to Order No. 202-06-1, issued by the Department of Energy ("DOE") in the above-captioned docket on February 17, 2006, the District of Columbia Public Service Commission ("DCPSC") hereby submits these Comments to provide the DOE and all interested parties with the information regarding the DCPSC's recent efforts to facilitate compliance with the DOE directives issued in this proceeding and to ensure that adequate supplies of electricity continue to exist to serve our Nation's capital. Comments of the District of Columbia Public Service Commission More Documents & Publications Preliminary Comments on Compliance Plan and Request for Clarification or,

363

Regulatory issues associated with the international oils & fats trade  

Science Conference Proceedings (OSTI)

FOSFAs John Hancock reviews three major areas of regulation of the global trading of oils and fats. Regulatory issues associated with the international oils & fats trade Inform Magazine Inform Archives Regulatory issues associated with the interna

364

Speakers: Howard K. Gruenspecht, EIA Shahid Chaudhry, California Energy Commission  

U.S. Energy Information Administration (EIA) Indexed Site

10: "The Energy-Water Nexus: Availability and Impacts" 10: "The Energy-Water Nexus: Availability and Impacts" Speakers: Howard K. Gruenspecht, EIA Shahid Chaudhry, California Energy Commission M. Michael Hightower, Sandia National Laboratories James Richenderfer, Susquehanna River Basin Commission Jeff C. Wright, Federal Energy Regulatory Commission [Note: Recorders did not pick up introduction of panel (see biographies for details on the panelists) or introduction of session.] Howard Gruenspecht: Okay, we're going to try to get underway here. We're still catching up on schedule from yesterday lunch, but I think we're making it back. Well, good morning, and welcome to the conference session on the Energy-Water Nexus. I'm Howard Gruenspecht, your moderator. Since it's going to be one of the last two

365

GRR/Section 7-OR-d - Expedited Plant Commissioning Process | Open Energy  

Open Energy Info (EERE)

7-OR-d - Expedited Plant Commissioning Process 7-OR-d - Expedited Plant Commissioning Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-OR-d - Expedited Plant Commissioning Process 07ORDExpeditedPlantCommissioningProcess.pdf Click to View Fullscreen Contact Agencies Oregon Department of Energy Regulations & Policies Revised Statute 469 Oregon Administrative Rules 345-015 Triggers None specified Click "Edit With Form" above to add content 07ORDExpeditedPlantCommissioningProcess.pdf 07ORDExpeditedPlantCommissioningProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Power Plants with an average electric generating capacity of less than 100

366

GRR/Section 7-CA-b - State Plant Commissioning Process, Small Power Plant  

Open Energy Info (EERE)

7-CA-b - State Plant Commissioning Process, Small Power Plant 7-CA-b - State Plant Commissioning Process, Small Power Plant Exception < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-CA-b - State Plant Commissioning Process, Small Power Plant Exception 07CABPlantCommissioningProcessSmallPowerPlantExemption.pdf Click to View Fullscreen Contact Agencies California Energy Commission Regulations & Policies California Code of Regulations, Title 20 - Public Utilities and Energy Triggers None specified Click "Edit With Form" above to add content 07CABPlantCommissioningProcessSmallPowerPlantExemption.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

367

GRR/Section 7-UT-c - Utah Public Service Commission | Open Energy  

Open Energy Info (EERE)

7-UT-c - Utah Public Service Commission 7-UT-c - Utah Public Service Commission < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-UT-c - Utah Public Service Commission 07UTCUtahPublicServiceCommissionProcess.pdf Click to View Fullscreen Contact Agencies Utah Public Service Commission Regulations & Policies Utah Code Title 54 Public Utilities Utah Code 11-13-304 Certificate of public convenience and necessity required --Exceptions Triggers None specified Click "Edit With Form" above to add content 07UTCUtahPublicServiceCommissionProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

368

Procedures and Standards for Residential Ventilation System Commissioning:  

NLE Websites -- All DOE Office Websites (Extended Search)

Procedures and Standards for Residential Ventilation System Commissioning: Procedures and Standards for Residential Ventilation System Commissioning: An Annotated Bibliography Title Procedures and Standards for Residential Ventilation System Commissioning: An Annotated Bibliography Publication Type Report LBNL Report Number LBNL-6142E Year of Publication 2013 Authors J. Chris Stratton, and Craig P. Wray Keywords ASHRAE 62.2, commissioning, procedures, residential, standards, ventilation Abstract Beginning with the 2008 version of Title 24, new homes in California must comply with ANSI/ASHRAE Standard 62.2-2007 requirements for residential ventilation. Where installed, the limited data available indicate that mechanical ventilation systems do not always perform optimally or even as many codes and forecasts predict. Commissioning such systems when they are installed or during subsequent building retrofits is a step towards eliminating deficiencies and optimizing the tradeoff between energy use and acceptable IAQ. Work funded by the California Energy Commission about a decade ago at Berkeley Lab documented procedures for residential commissioning, but did not focus on ventilation systems. Since then, standards and approaches for commissioning ventilation systems have been an active area of work in Europe. This report describes our efforts to collect new literature on commissioning procedures and to identify information that can be used to support the future development of residential-ventilation-specific procedures and standards. We recommend that a standardized commissioning process and a commissioning guide for practitioners be developed, along with a combined energy and IAQ benefit assessment standard and tool, and a diagnostic guide for estimating continuous pollutant emission rates of concern in residences (including a database that lists emission test data for commercially-available labeled products).

369

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM OVERALL PROGRAM GUIDEBOOK Fifth Edition Gonçalves Office Manager Renewable Energy Office Dave Ashuckian, P.E. Deputy Director Efficiency and Renewable Energy Division Robert P. Oglesby Executive Director The California Energy Commission formally

370

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM OVERALL PROGRAM GUIDEBOOK Sixth Edition Gonçalves Office Manager Renewable Energy Office Dave Ashuckian, P.E. Deputy Director Efficiency and Renewable Energy Division Robert P. Oglesby Executive Director The California Energy Commission formally

371

US Department of Energys Regulatory Negotiations Convening...  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Negotiations Convening on Commercial Certification for Heating, Ventilating, Air-Conditioning, and Refrigeration Equipment Public Information for Convening Interviews...

372

Federal Energy Management Program: Commissioning Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning Commissioning Process to someone by E-mail Share Federal Energy Management Program: Commissioning Process on Facebook Tweet about Federal Energy Management Program: Commissioning Process on Twitter Bookmark Federal Energy Management Program: Commissioning Process on Google Bookmark Federal Energy Management Program: Commissioning Process on Delicious Rank Federal Energy Management Program: Commissioning Process on Digg Find More places to share Federal Energy Management Program: Commissioning Process on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Types Process Metering Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources Contacts Greenhouse Gases

373

EUROPEAN COMMISSION ICT -INFORMATION AND COMMUNICATION TECHNOLOGIES  

E-Print Network (OSTI)

, Environmental Sustainability and Energy Efficiency.............................................................................. 63 Annex 1: International cooperation partner countries) Support to research projects carried out by consortia with participants from different countries, aiming

Meju, Max

374

Orlando Utilities Commission - Residential Energy Efficiency Rebate Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Orlando Utilities Commission - Residential Energy Efficiency Rebate Orlando Utilities Commission - Residential Energy Efficiency Rebate Program Orlando Utilities Commission - Residential Energy Efficiency Rebate Program < Back Eligibility Residential Savings Category Home Weatherization Commercial Weatherization Sealing Your Home Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Ventilation Heat Pumps Insulation Design & Remodeling Water Heating Windows, Doors, & Skylights Maximum Rebate Energy Star Heat Pump Water Heater:$650 Duct Repair/Replacement: $160 Contact OUC for more information on maximum incentive levels Program Info State Florida Program Type Utility Rebate Program Rebate Amount Window Film or Solar Screen : $1/sq.ft. Energy Star Windows : $2/sq.ft. Cool Roof: $0.14/sq. ft.

375

Environmental regulatory update table, March 1989  

Science Conference Proceedings (OSTI)

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlberg, L.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

1989-04-01T23:59:59.000Z

376

Environmental Regulatory Update Table, December 1989  

Science Conference Proceedings (OSTI)

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlbert, L.M.; Langston, M.E. (Tennessee Univ., Knoxville, TN (USA)); Nikbakht, A.; Salk, M.S. (Oak Ridge National Lab., TN (USA))

1990-01-01T23:59:59.000Z

377

Environmental Regulatory Update Table, April 1989  

SciTech Connect

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlberg, L.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

1989-05-01T23:59:59.000Z

378

Environmental Regulatory Update Table, September 1991  

SciTech Connect

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

1991-10-01T23:59:59.000Z

379

Embedded Commissioning for Building Design  

E-Print Network (OSTI)

Building Commissioning has a broad scope that extends to all phases of building delivery. We view commissioning as a building delivery embedded process that persistently verifies and validates design intent throughout the building lifecycle process. In the building lifecycle approach, buildings are considered to have cradle-to-grave life spans. They are modeled through a variety of different developmental phases. In this research project, we intend to build the necessary theory and tools to support the embedded commissioning process as a co-function of building lifecycle.

Akin, O.; Turkaslan-Bulbul, M. T.; Gursel, I.; Garrett, J. H.; Akinci, B.; Wang, H.

2004-01-01T23:59:59.000Z

380

Natural Gas Regulation - Other Gas-Related Information Sources | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Regulation - Other Gas-Related Information Sources Natural Gas Regulation - Other Gas-Related Information Sources Natural Gas Regulation - Other Gas-Related Information Sources The single largest source of energy information available is the Department of Energy's Energy Information Administration (EIA). The EIA publishes extensive reports on natural gas and other energy sources. Domestic natural gas markets are regulated in part by the Federal Energy Regulatory Commission. The commission's chief area of concern is the interstate natural gas market. Natural gas moves for the most part by pipeline in the United States. The safety of those pipelines is the concern of the Department of Transportation's Office of Pipeline Safety. In Canada the regulation of interprovincial and international natural gas is the responsibility of the National Energy Board. Their areas of

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

California Energy Commission DRAFT STAFF REPORT  

E-Print Network (OSTI)

on eligibility of hydroelectric and fuel cell facilities, respectively). The Energy Commission recognizesCalifornia Energy Commission STAFF REPORT RENEWABLES PORTFOLIO STANDARD ELIGIBILITY Draft Staff Guidebook Fourth Edition AUGUST 2010 CEC3002010007SD #12;CALIFORNIA ENERGY COMMISSION Kate Zocchetti

382

EIA - Natural Gas Pipeline Network - Regulatory Authorities  

U.S. Energy Information Administration (EIA) Indexed Site

Regulatory Authorities Regulatory Authorities About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates U.S. Natural Gas Regulatory Authorities Beginning | Regulations Today | Coordinating Agencies | Regulation of Mergers and Acquisitions Beginning of Industry Restructuring In April 1992, the Federal Energy Regulatory Commission (FERC) issued its Order 636 and transformed the interstate natural gas transportation segment of the industry forever. Under it, interstate natural gas pipeline companies were required to restructure their operations by November 1993 and split-off any non-regulated merchant (sales) functions from their regulated transportation functions. This new requirement meant that interstate natural gas pipeline companies were allowed to only transport natural gas for their customers. The restructuring process and subsequent operations have been supervised closely by FERC and have led to extensive changes throughout the interstate natural gas transportation segment which have impacted other segments of the industry as well.

383

u. S. Atomic Energy Commission  

Office of Legacy Management (LM)

October 31, 1949 Manager of Operations u. S. Atomic Energy Commission R. 0. Box 30, Ansonia Station New York ES, N. Y. MATERIALS 5+k& hJf Reference: SK:BL Attention: Mr. R. J....

384

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

: Solazyme, Incorporated, "Development of Pilot Production Plants for Soladiesel RD Utilizing) Renewable Diesel Solazyme, Inc. In Progress Non-Attainment (All) Source: Energy Commission staff analysis as a high percentage of sensitive populations. #12;2 Project Name Solazyme, Incorporated

385

Rivanna River Basin Commission (Virginia)  

Energy.gov (U.S. Department of Energy (DOE))

The Rivanna River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the Rivanna River...

386

TATE OF CALIFORNI NERGY COMMISSION  

E-Print Network (OSTI)

and Wildlife), Blaine Parker (Columbia River Inter-Tribal Fish Commission) and Brad James (Washington and on sturgeon passage at Columbia River hydroelectric dams. The presentation will review progress

387

Commissioning of the HELIOS spectrometer.  

Science Conference Proceedings (OSTI)

This paper describes the implementation and commissioning of a device based on a new concept for measurements of nuclear reactions in inverse kinematics. The HELIcal Orbit Spectrometer, HELIOS, was commissioned at Argonne National Laboratory by studying the {sup 28}Si(d,p){sup 29}Si reaction in inverse kinematics. This experiment served as a proof of principle for this previously untested concept, and was used to verify the response and performance characteristics of HELIOS.

Lighthall, J. C.; Back, B. B.; Baker, S. I.; Freeman, S. J.; Lee, H. Y.; Kay, B. P.; Marley, S. T.; Rehm, K. E.; Rohrer, J. E.; Schiffer, J. P.; Shetty, D. V.; Vann, A. W.; Winkelbauer, J. R.; Wuosmaa, A. H.; Physics; Western Michigan Univ.; Univ. of Manchester

2010-01-01T23:59:59.000Z

388

Wisconsin SRF Electron Gun Commissioning  

SciTech Connect

The University of Wisconsin has completed fabrication and commissioning of a low frequency (199.6 MHz) superconducting electron gun based on a quarter wave resonator (QWR) cavity. Its concept was optimized to be the source for a CW free electron laser facility. The gun design includes active tuning and a high temperature superconducting solenoid. We will report on the status of the Wisconsin SRF electron gun program, including commissioning experience and first beam measurements.

Bisognano, Joseph J. [University of Wisconsin-Madison; Bissen, M. [University of Wisconsin-Madison; Bosch, R. [University of Wisconsin-Madison; Efremov, M. [University of Wisconsin-Madison; Eisert, D. [University of Wisconsin-Madison; Fisher, M. [University of Wisconsin-Madison; Green, M. [University of Wisconsin-Madison; Jacobs, K. [University of Wisconsin-Madison; Keil, R. [University of Wisconsin-Madison; Kleman, K. [University of Wisconsin-Madison; Rogers, G. [University of Wisconsin-Madison; Severson, M. [University of Wisconsin-Madison; Yavuz, D. D. [University of Wisconsin-Madison; Legg, Robert A. [JLAB; Bachimanchi, Ramakrishna [JLAB; Hovater, J. Curtis [JLAB; Plawski, Tomasz [JLAB; Powers, Thomas J. [JLAB

2013-12-01T23:59:59.000Z

389

Commissioning: A Highly Cost-Effective Building Energy Management Strategy  

E-Print Network (OSTI)

Commissioning: A Highly Cost-Effective Building Energypractice of building commissioning is a particularly potentefficiency. Although commissioning has earned increased

Mills, Evan

2012-01-01T23:59:59.000Z

390

Public Utility Regulatory Act, Alternative Energy Providers (Texas) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regulatory Act, Alternative Energy Providers (Texas) Regulatory Act, Alternative Energy Providers (Texas) Public Utility Regulatory Act, Alternative Energy Providers (Texas) < Back Eligibility Utility Fed. Government Commercial Investor-Owned Utility Industrial Construction Municipal/Public Utility Local Government Rural Electric Cooperative Tribal Government Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Texas Program Type Safety and Operational Guidelines Provider Public Utility Commission of Texas Chapter 35 of the Public Utility Regulatory Act specifically addresses alternative energy providers, and contains provisions designed to aid such providers in selling power in Texas's competitive utility market. The

391

Types of Commissioning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Types of Commissioning Types of Commissioning Types of Commissioning October 7, 2013 - 9:17am Addthis Several commissioning types exist to address the specific needs of equipment and systems across both new and existing buildings. The following commissioning types provide a good overview. New Building Commissioning New building commissioning happens during the design and construction of new facilities. The process ensures that systems and equipment in new buildings operate properly. This is done through design reviews, functional testing, system documentation, and operator training. Federal agencies should consider new building commissioning when building new facilities or undergoing major facility renovations. The process is best implemented through all phases of construction.

392

Potential Benefits of Commissioning California Homes  

NLE Websites -- All DOE Office Websites (Extended Search)

Potential Benefits of Commissioning California Homes Title Potential Benefits of Commissioning California Homes Publication Type Report LBNL Report Number LBNL-48258 Year of...

393

Federal Energy Management Program: Types of Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

of Commissioning to someone by E-mail Share Federal Energy Management Program: Types of Commissioning on Facebook Tweet about Federal Energy Management Program: Types of...

394

Residential Commissioning: A Review of Related Literature  

NLE Websites -- All DOE Office Websites (Extended Search)

Residential Commissioning: A Review of Related Literature Title Residential Commissioning: A Review of Related Literature Publication Type Report LBNL Report Number LBNL-44535 Year...

395

Commission on Energy Efficiency Standards and Practices  

NLE Websites -- All DOE Office Websites (Extended Search)

Submitted in Compliance with Iowa Code Section 103A.27 January1, 2011 Commission on Energy Efficiency Standards and Practices Commission on Energy Efficiency Standards and...

396

GRR/Section 7-OR-b - State Plant Commissioning Process | Open Energy  

Open Energy Info (EERE)

7-OR-b - State Plant Commissioning Process 7-OR-b - State Plant Commissioning Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-OR-b - State Plant Commissioning Process 07ORBStatePlantCommissioningProcess (1).pdf Click to View Fullscreen Contact Agencies Oregon Department of Energy Regulations & Policies OAR 345-20-0011 Contents of a Notice of Intent OAR 345-015-0001 et seq Proceedings, including site certificate hearings Triggers None specified Click "Edit With Form" above to add content 07ORBStatePlantCommissioningProcess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

397

Commissioning of the ATLAS pixel detector  

SciTech Connect

The ATLAS pixel detector is a high precision silicon tracking device located closest to the LHC interaction point. It belongs to the first generation of its kind in a hadron collider experiment. It will provide crucial pattern recognition information and will largely determine the ability of ATLAS to precisely track particle trajectories and find secondary vertices. It was the last detector to be installed in ATLAS in June 2007, has been fully connected and tested in-situ during spring and summer 2008, and is ready for the imminent LHC turn-on. The highlights of the past and future commissioning activities of the ATLAS pixel system are presented.

ATLAS Collaboration; Golling, Tobias

2008-09-01T23:59:59.000Z

398

Federal Energy Regulation Commission Issues Smart Grid ...  

Science Conference Proceedings (OSTI)

Federal Energy Regulation Commission Issues Smart Grid Policy Statement. For Immediate Release: July 17, 2009. ...

2012-06-04T23:59:59.000Z

399

Commissioning Building Systems for Improved Energy ...  

Science Conference Proceedings (OSTI)

Commissioning Building Systems for Improved Energy Performance Project. Summary: NIST will advance commercial building ...

2012-12-17T23:59:59.000Z

400

United States - U.S. Energy Information Administration ...  

U.S. Energy Information Administration (EIA)

... The California Solar Initiative - CSI: ... U.S. Nuclear Regulatory Commission, ... Clean Cities Coalition Locations, Data as of May 17, 2013. ...

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Definition: Open Access Transmission Tariff | Open Energy Information  

Open Energy Info (EERE)

navigation, search Dictionary.png Open Access Transmission Tariff Electronic transmission tariff accepted by the U.S. Federal Energy Regulatory Commission requiring the...

402

Nigeria - Analysis - U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

Installed electricity capacity has remained relatively stable ... The Nigeria Electricity Regulatory Commission has also said that new tariffs will be imposed on ...

403

Today in Energy - U.S. Energy Information Administration (EIA)  

U.S. Energy Information Administration (EIA)

NRC (Nuclear Regulatory Commission) July 2, 2013 Lower power prices and high repair costs drive nuclear retirements. November 14, 2012 San Onofre nuclear outage ...

404

Using Simulation Models for Building Commissioning  

E-Print Network (OSTI)

The International Energy Agency ECBCS Annex 40 Commissioning of Buildings and HVAC Systems for Improved Energy Performance task investigating Use of Whole Building Simulation in Commissioning has identified the following applications of whole simulation in the commissioning process: 1) during the design process; 2) in post-construction commissioning of new buildings; 3) design simulation for ongoing commissioning; 4) calibrated simulation for retro commissioning; 5) calibrated simulation for on-going commissioning; and 6) simulation to evaluate new control code. These applications are discussed and examples of each of these applications are provided. The only one of these which has been applied in routine commissioning projects is the use of calibrated simulation for retro commissioning. The other examples have been applied in a research setting, and costs must be lowered for routine application, but there appears to be potential for significant application of simulation in the commissioning process.

Claridge, D. E.

2004-01-01T23:59:59.000Z

405

Nondestructive Evaluation: Probabilistic Risk Assessment Technical Adequacy Guidance for Risk-Informed In-Service Inspection Programs  

Science Conference Proceedings (OSTI)

Risk-informed methodologies have been developed in order to establish alternative in-service inspection (ISI) requirements that are defined as risk-informed in-service inspection (RI ISI) programs. Plant-specific probabilistic risk assessments (PRAs) are typically used during the RI ISI development process. The ASME PRA Standard (for example, ASME RA Sb 2005) and the U.S. Nuclear Regulatory Commission (NRC) Regulatory Guide (RG) 1.200 R1 and R2 have been issued and provide guidance in determining PRA tec...

2011-07-29T23:59:59.000Z

406

Commissioning of the ATLAS Experiment  

E-Print Network (OSTI)

The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The sub-detector integration in recent milestone weeks is described. Cosmic commissioning in milestone week M6 included simultaneous data-taking and combined track analysis of the muon detector and inner detector, as well as combined analysis of muon detector and muon trigger. The calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The high-level-trigger infrastructure is being installed and algorithms tested in technical runs.

Juergen Thomas; for the ATLAS Collaboration at CERN

2008-08-07T23:59:59.000Z

407

Commissioning Results of the Upgraded Neutralized Drift Compression Experiment  

E-Print Network (OSTI)

COMMISSIONING RESULTS OF THE UPGRADED NEUTRALIZED DRIFTexperiments. We report on commissioning results of the

Lidia, S.M.

2009-01-01T23:59:59.000Z

408

Developing a Regulatory Framework for Extended Storage and Transportation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Developing a Regulatory Framework Developing a Regulatory Framework for Extended Storage and Transportation National Transportation Stakeholders Forum May 10-12, 2011 Denver, Colorado Earl Easton Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Outline * Current Regulatory Framework * Future Regulatory Needs * Technical Basis (with some examples) * Path Forward 2 Current NRC Regulatory Framework for Storage * Renewable Term Licenses * Aging Management Plan - Time-limited aging analyses - Design for prevention - Monitoring - how, how often, in-situ - Maintenance - what type - Corrective Actions - when 3 Dry Cask Storage * 63 licensed ISFSIs (8 more than 2010) * Expect 10 sites pursuing General License * Over 1400 loaded storage casks 0 10 20 30 40 50 60 70 80 Number of ISFSIs Year Specific Licensees

409

California Energy Commission Apply Today!  

E-Print Network (OSTI)

photovoltaic project in the future. Peak Demand Savings: 95 kW Energy Savings: 1,510,849 kWh Annual Energy CostCalifornia Energy Commission Apply Today! "The College implemented all of the recommended projects Programs Office (916) 654-4147 pubprog@energy.state.ca.us "CEC financing allowed us to install many

410

California Energy Commission STAFF DRAFT  

E-Print Network (OSTI)

efficiency small engined cars, hybrid cars, biofuels and a significant switch to public transport. Tough) and to diesel and biofuels for cars. It is the aim of the European Commission that the EU ETS scheme under stable market conditions. Current volatility in wholesale electricity markets works against

411

o:\informs\fixforms\nrc741.wpf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FORM 741 FORM 741 (5-2002) Previous editions are obsolete MANDATORY DATA COLLECTION AUTHORIZED BY 10 CFR 30, 40, 50, 70, 72, 74, 75, 150, Public Laws 83-703, 93-438, 95-91 þ þ þ þ þ þ 23a. MISCELLANEOUS NUCLEAR MATERIAL TRANSACTION REPORT Estimated burden per response to comply with this mandatory collection request: 1 hr and 15 minutes. This information is required for IAEA accounting reports that show changes in inventory of nuclear materials. Send comments regarding burden estimate to the Records Management Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0003), Office of Management and Budget, Washington, DC 20503. If a means used to

412

Improving Regulation and Regulatory Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alton Strategic Environmental Group Alton Strategic Environmental Group New Port Richey, FL charles.alton@earthlink.net April 4, 2011 Daniel Cohen, Assistant General Counsel Legislation, Regulation, and Energy Efficiency Office of the General Counsel U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Dear Mr. Cohen: I have reviewed the Request For Information regarding Reducing Regulatory Reform issued

413

COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST FOR  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST FOR INFORMATION REGARDING SMART GRID POLICY COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST FOR INFORMATION REGARDING SMART GRID POLICY The Michigan Public Service Commission Staff (MPSC Staff) commends the Department of Energy for seeking comments on policy and challenges confronting smart grid deployments as stated in the Request for Information (RFI) addressing Policy and Logistical Challenges to Smart Grid Implementation. COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST FOR INFORMATION REGARDING SMART GRID POLICY More Documents & Publications Comments of DRSG to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges Smart Grid RFI: Addressing Policy and Logistical Challenges, Comments from

414

STATE OF CALIFORNIA -NATURAL RESOURCES AGENCY EDMUND G. BROWN JR., Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

: Experimental and Numerical Studies in Gas Turbine Heat Transfer ­ Funding support from the Department of Energy and Numerical Studies in Gas Turbine Heat Transfer ­ Funding support from the Department of Energy, the National Regulatory Commission Faculty Development Grant for new faculty start-up funds o initiated a series

415

Notices Safety Commission, 4330 East West  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Federal Register 0 Federal Register / Vol. 77, No. 8 / Thursday, January 12, 2012 / Notices Safety Commission, 4330 East West Highway, Bethesda, MD 20814, (301) 504-7923. Dated: January 10, 2012. Todd A Stevenson, Secretary. [FR Doc. 2012-625 Filed 1-10-12; 4:15 pm] BILLING CODE 6355-01-P CORPORATION FOR NATIONAL AND COMMUNITY SERVICE Information Collection; Submission for OMB Review, Comment Request AGENCY: Corporation for National and Community Service. ACTION: Notice. SUMMARY: The Corporation for National and Community Service (the Corporation), has submitted a public information collection request (ICR) entitled Day of Service Project Promotion Tool for review and approval in accordance with the Paperwork Reduction Act of 1995, Public Law 104- 13, (44 U.S.C. chapter 35). Copies of this

416

Environmental externalities: A survey of state commission actions  

SciTech Connect

Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC`s Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a ``snapshot`` of regulatory developments in an area that is evolving rapidly. 16 refs.

Cohen, S.D.; Eto, J.H. [National Association of Regulatory Utility Commissioners, Washington, DC (United States); Goldman, C.A. [Lawrence Berkeley Lab., CA (United States); Beldock, J. [USDOE Assistant Secretary for Conservation and Renewable Energy, Washington, DC (United States). Office of Buildings and Community Systems; Crandall, G. [MSB Associates, Middleton, WI (United States)

1990-05-01T23:59:59.000Z

417

Environmental externalities: A survey of state commission actions  

Science Conference Proceedings (OSTI)

Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC's Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a snapshot'' of regulatory developments in an area that is evolving rapidly. 16 refs.

Cohen, S.D.; Eto, J.H. (National Association of Regulatory Utility Commissioners, Washington, DC (United States)); Goldman, C.A. (Lawrence Berkeley Lab., CA (United States)); Beldock, J. (USDOE Assistant Secretary for Conservation and Renewable Energy, Washington, DC (United States). Office of Buildings and Community Systems); Crandall, G. (MSB Associates, Middleton, WI (United States))

1990-05-01T23:59:59.000Z

418

Public Utility Commission in the year 2000  

Science Conference Proceedings (OSTI)

This article is about What is and What ought to be as we look to the institution of public utility commission regulation at the turn of the century. To signal my own view at the outset, I find the prospects somewhat worrisome in light of the nature and direction of much of the response to real and imaginary changes in the regulated sectors. I surely do not call for standing in place, but I strongly believe we should leave the place standing. The following items are discernable trends that will shape the PUC at the turn-of-the century: (1) dichotomy of customers into core and noncore groups, (2) unbundling and new service offerings with a menu of prices, (3) relaxed regulation and increased reliance on market solutions instead of command and control, (4) increased use of market-based pricing and incentive ratemaking, (5) large users seeking lowest-cost generation and supply services, (6) shift from old regulatory bargains regarding exclusive territorial franchises and assured recovery of costs and investments, (7) utility diversification, (8) increasing business risk for utilities, amd (9) uncertainty as to continued utility attention to social goals and a changing obligation to serve. For each of these, the author focuses on: (1) changing missions and roles of the PUC, (2) the strategies for achieving them, and (3) the implementation requirements that operationalize the strategies.

Jones, D.N.

1995-12-31T23:59:59.000Z

419

Best Practices in Existing Building Commissioning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OCTOBER 20-21, 2010 OCTOBER 20-21, 2010 RAPID CITY, SD Best Practices in Existing Building Commissioning Carl E. Lundstrom, P. E., CCP Federal Solutions Manager E M C Engineers, Inc. - Subsidiary of Eaton Corporation * The Purpose & Benefits of Existing Building Commissioning (EBCx) * The Building Commissioning Association (BCA) & "Best Practices" * Contracting & Hiring Qualified Providers * Typical Measures & Ideal Facilities * Success Factors Presentation Agenda What is The Building Commissioning Association? Integrity Leadership Quality Expertise  International non-profit organization (founded in 1998)  Recognized commissioning authority and resource  Commissioning providers, building owners, energy companies, facility managers, architects, engineers, and contractors

420

Fiscal years 1994--1998 Information Technology Strategic Plan. Volume 1  

SciTech Connect

A team of senior managers from across the US Nuclear Regulatory Commission (NRC), working with the Office of Information Resources Management (IRM), has completed an NRC Strategic Information Technology (IT) Plan. The Plan addresses three major areas: (1) IT Program Management, (2) IT Infrastructure, and (3) Information and Applications Management. Key recommendations call for accelerating the replacement of Agency workstations, implementing a new document management system, applying business process reengineering to selected Agency work processes, and establishing an Information Technology Council to advise the Director of IRM.

1993-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

U.S. Nuclear Regulation Data (Information Digest, 2010 - 2011) | OpenEI  

Open Energy Info (EERE)

Nuclear Regulation Data (Information Digest, 2010 - 2011) Nuclear Regulation Data (Information Digest, 2010 - 2011) Dataset Summary Description The US Nuclear Regulatory Commission (NRC) publishes an Information Digest containing summary information about the NRC and its industry. The report's appendices include demographic data on U.S. nuclear power reactors, both commercial and test facilities. Details include licensee data, location, and capacity. In addition there is information on dry spent fuel storage. The data include activities through 2009 or the most current data available. Source U.S. Nuclear Reactor Commission (USNRC) Date Released August 31st, 2010 (4 years ago) Date Updated Unknown Keywords nuclear Data application/vnd.ms-excel icon US Commercial Nuclear Power Reactors (xls, 132.6 KiB) application/vnd.ms-excel icon US Commercial Nuclear Power Reactors, Permanently Shutdown (xls, 32.8 KiB)

422

California Energy Commission Public Interest Energy Research Program  

E-Print Network (OSTI)

, or a selected time period, are useful and essential for analyzing energy usage history. Most Utility EISCalifornia Energy Commission Public Interest Energy Research Program LBNL No. 49977 (HPCBS No. E5P2.2T1b4) Web-based Energy Information Systems for Large Commercial Buildings Element 5 - Integrated

423

California Energy Commission The California Energy Commission is an EQUAL OPPORTUNITY EMPLOYER equal opportunity to all regardless of race, color, creed, national origin,  

E-Print Network (OSTI)

status, disability, religious or political affiliation, age or sexual orientation. For more information, transportation infrastructure, fueling infrastructure, and or conversion technologies and environmental issues a team, or lead an interdisciplinary team, utilizing a personal computer and appropriate Commission

424

COMMISSION  

E-Print Network (OSTI)

amended), the National Science Foundation announces the following meeting: Name: Advisory Committee for Polar Programs (1130). Date/Time: May 29, 2008, 8 a.m. to 5 p.m.

Committee Act (pub L

2008-01-01T23:59:59.000Z

425

Regulatory Considerations for Developing Generation Projects on Federal Lands  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mason Emnett Mason Emnett Office of Energy Policy and Innovation Jonathan First Office of the General Counsel February 6, 2013 NOTE: Comments herein do not represent the views of the Federal Energy Regulatory Commission or its Commissioners Regulatory Considerations for Developing Generation Projects on Federal Lands 2 Purpose of this Presentation * Describe the types of transactions that fall under FERC jurisdiction * Describe pertinent federal laws and how they apply - What does it mean to be a "public utility" or "transmitting utility" under federal law? - How does ownership and usage of a generation facility impact regulatory considerations? - When are parties required to register with NERC? 3 FERC-Related Statutes * Federal Power Act

426

Regulatory Considerations for Developing Generation Projects on Federal Lands  

NLE Websites -- All DOE Office Websites (Extended Search)

Mason Emnett Mason Emnett Office of Energy Policy and Innovation Jonathan First Office of the General Counsel February 6, 2013 NOTE: Comments herein do not represent the views of the Federal Energy Regulatory Commission or its Commissioners Regulatory Considerations for Developing Generation Projects on Federal Lands 2 Purpose of this Presentation * Describe the types of transactions that fall under FERC jurisdiction * Describe pertinent federal laws and how they apply - What does it mean to be a "public utility" or "transmitting utility" under federal law? - How does ownership and usage of a generation facility impact regulatory considerations? - When are parties required to register with NERC? 3 FERC-Related Statutes * Federal Power Act

427

U. S. Atomic Energy Commission  

Office of Legacy Management (LM)

Commission Commission Division of Licensing and Regulation Washington 25, D. C. Attention: Mr. Eber R. Price Gentlemen: This is in response to your letter of 17 April 1962 regarding the inspection conducted at our Jayhawk Works at Pittsburg, Kansas on May Z-5, 1961 under Source Material License C-4352 and Special Nuclear Material Licenses No. SW-154 and S.Iw-329. Reblying to your items as listed in your letter, we submit the following in- formation'for your consideration: I. Time-occupancy studies have been made in the area where high air-borne dust samples "ere observed. A. Incidents Involving Thorium Six incidents have bee" noted involving thorium, natural isotopic ClSS=y. The counts of the air samples in these six samples are as follows: Microcuries per ml of Air

428

U. S. Atomic Energy Commission  

Office of Legacy Management (LM)

Commission Commission Division of Licensing and Regulation Washington 25, D. C. .I,.----- Attention: Mr. Eber R. Price Gentlemen: ' B?&-# This is in response to your letter of 17 April 1962 regarding the inspection conducted at our Jayhawk Works at Pittsburg, Kansas on May 2-5, 1961 under Source Material License C-4352 and Special Nuclear Material Licenses No. S&l-154 and SNM-329. Replying to your items as listed in your letter, we submit the following in- formation'for your consideration: I. Time-occupancy studies have been made in the area where high air-borne dust samples were observed. A. I&dents Involving Thorium Six incidents have been noted involving thorium, natural isotopic CLSS5.Y. follows: The counts of the air samples in these six samples are as

429

Regulatory and technical reports: (Abstract index journal). Compilation for first quarter 1997, January--March  

Science Conference Proceedings (OSTI)

This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. This compilation is published quarterly and cummulated annually. Reports consist of staff-originated reports, NRC-sponsored conference reports, NRC contractor-prepared reports, and international agreement reports.

Sheehan, M.A.

1997-06-01T23:59:59.000Z

430

Commissioning the CDF offline software  

SciTech Connect

CDF II is one of the two large collider experiments at Fermilab's Tevatron. Over the past two years we have commissioned the offline computing system. A task that has involved bringing up hundreds of computers and millions of lines of C++ software. This paper reports on this experience, concentrating on the software aspects of the project. We will highlight some of the successes as well as describe some of the work still to do.

Elizabeth Sexton-Kennedy and Pasha Murat

2004-03-17T23:59:59.000Z

431

On Line Beamline Commissioning Activity Approval Form  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning Activity Approval Form Commissioning Activity Approval Form This form is to be filled by the Commissioning Activity Team Leader. No beamline commissioning activities will be allowed to run without a properly completed, approved, and posting of this commissioning approval form. You will be notified by e-mail upon approval. Sector Beamline Expected Start Date Expected Duration 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 BM ID ( Give a Unit) Activity Description( Give only a brief description) Commissioning Team Members First and Last Name Affiliation Phone Number 1. 2. 3. 4. 5. 6. Special Safety Concerns Commissioning Activity Team Leader Name E-Mail Address Submit Commissioning Activity Approval Form Clear all Fields and start All over again!!!

432

TB-14 Section 8 - Beamline Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

8. Beamline Commissioning (Rev. July 21, 1998) A beamline commissioning process has been instituted to ensure that all systems are in place so that a beamline can perform in a safe...

433

Flathead Basin Commission Act of 1983 (Montana)  

Energy.gov (U.S. Department of Energy (DOE))

This Act establishes the Flathead Basin Commission, the purpose of which is to protect the Flathead Lake aquatic environment, its waters, and surrounding lands and natural resources. The Commission...

434

Emergency Petition and Complaint of the District of Columbia Public Service Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AND AND FEDERAL ENERGY REGULATORY COMMISSION Emergency Petition and Complaint of ) Docket No. EL05-145-000 District of Columbia Public Service ) Commission ) EMERGENCY PETITION AND COMPLAINT OF THE DISTRICT OF COLUMBIA PUBLIC SERVICE COMMISSION Pursuant to Sections 202(c), 207 and 309 of the Federal Power Act ("FPA"), 16 U.S.C. §§ 824a(c), 824f and 825h, the District of Columbia Public Service Commission ("DCPSC") hereby submits this Emergency Petition and Complaint to avert the impending shutdown of the Potomac River Generating Station power plant ("Potomac River Plant" or "Plant") owned and operated by Mirant Corporation and its public utility subsidiaries (collectively, "Mirant") in Alexandria, Virginia.

435

Design and Commissioning of a Laboratory Scale ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2012 TMS Annual Meeting & Exhibition. Symposium , Electrometallurgy 2012. Presentation Title, Design and Commissioning of a...

436

Experience with Commissioning New Generation Gas Suspension ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2013 TMS Annual Meeting & Exhibition. Symposium , Alumina and Bauxite. Presentation Title, Experience with Commissioning...

437

Commissioning of Emirates Aluminium Smelter Potlines  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2012 TMS Annual Meeting & Exhibition. Symposium , Aluminum Reduction Technology. Presentation Title, Commissioning of...

438

STATE OF CALIFORNIA THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

Rock Geothermal Power Plant to November 11, 2006, and amend related Biological Resources Conditions AND DEVELOPMENT COMMISSION In the Matter of: ) BOTTLE ROCK GEOTHERMAL POWER PLANT ) ) ) Docket No. 79-AFC-4C with the Commission to restart the power plant. The extension of the monitoring program is based on information

439

Let The People Know the Facts: Can Government Information Removed From the Internet Be Reclaimed?  

E-Print Network (OSTI)

www.ombwatch.org/article/articleview/213/1/104/#FERC (Energy Regulatory Commissions (FERC) reconsideration of itsFERC removes documents). Law Library Journal [Vol. 98:1

2006-01-01T23:59:59.000Z

440

Corporation Commission Hydraulic FracturingHydraulic Fracturing  

E-Print Network (OSTI)

Corporation Commission Hydraulic FracturingHydraulic Fracturing Joint Committee on Energy Commission What is Hydraulic Fracturing d H D It W k?and How Does It Work? · Stimulates a well to increase by Stanolind Oil Company. 2 #12;Kansas Corporation Commission Are Hydraulic Fracture Jobs Performed in Kansas

Peterson, Blake R.

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

CALIFORNIA POSTSECONDARY EDUCATION COMMISSION PRESS RELEASE  

E-Print Network (OSTI)

CALIFORNIA POSTSECONDARY EDUCATION COMMISSION PRESS RELEASE Contact: Linda White California Postsecondary Education Commission 1303 J Street, Suite 500 Sacramento, California 95814-2938 (916) 322-7984 lwhite@cpec.ca.gov Commission Awards $1,889,657 Grant to California State University Fullerton to Improve

de Lijser, Peter

442

o:\informs\fixforms\nrc740m.wpf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONCISE NOTE CONCISE NOTE DOE/NRC FORM 740M (5-2002) MANDATORY DATA COLLECTION AUTHORIZED BY 10 CFR 30, 40, 50, 70, 72, 74, 75, 150, Public Laws 83-703, 93-438, 95-91 Estimated burden per response to comply with this mandatory collection request: 45 minutes. This information is required to satisfy the provisions of the US/IAEA Safeguards Agreement. Send comments regarding burden estimate to the Records Management Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0057), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to

443

Regulatory Oversight Program, July 1, 1993--March 3, 1997. Volume 2: Appendices  

Science Conference Proceedings (OSTI)

On July, 1993, a Regulatory Oversight (RO) organization was established within the US DOE, Oak Ridge Operations to provide regulatory oversight of the DOE uranium enrichment facilities leased to the United States Enrichment Corporation (USEC). The purpose of the OR program was to ensure continued plant safety, safeguards and security while the plants were transitioned to regulatory oversight by the Nuclear Regulatory Commission (NRC). Volume 2 contains copies of the documents which established the relationship between NRC, DOE, USEC, and DOL (Dept of Labor) required to facilitate regulatory oversight transition.

NONE

1997-12-31T23:59:59.000Z

444

Alaska Oil and Gas Conservation Commission: February 2011 Drilling & Permit  

Open Energy Info (EERE)

Oil and Gas Conservation Commission: February 2011 Drilling & Permit Oil and Gas Conservation Commission: February 2011 Drilling & Permit Records Dataset Summary Description This dataset contains oil and gas drilling and permit records for February 2011. State oil and gas boards and commissions make oil and gas data and information open to the public. To view the full range of data contained at the Alaska Oil and Gas Conservation Commission, visit http://doa.alaska.gov/ogc/ Source Alaska Oil and Gas Conservation Commission Date Released February 28th, 2011 (3 years ago) Date Updated Unknown Keywords Alaska Commission gas oil Well record Data application/vnd.ms-excel icon http://doa.alaska.gov/ogc/drilling/dindex.html (xls, 34.3 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Monthly

445

Automated Demand Response Strategies and Commissioning Commercial Building Controls  

E-Print Network (OSTI)

Conference on Building Commissioning: April 19-21, 2006Auto-DR Strategies and Commissioning One common questionConference on Building Commissioning: April 19-21, 2006

Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila; Linkugel, Eric

2006-01-01T23:59:59.000Z

446

Results and commissioning issues from an automated demand response pilot  

E-Print Network (OSTI)

Conference on Building Commissioning. May 2002. Motegi,et al: Results and Commissioning Issues from an AutomatedConference on Building Commissioning: May 1e-20, 2004

Piette, Mary Ann; Watson, Dave; Sezgen, Osman; Motegi, Naoya

2004-01-01T23:59:59.000Z

447

Commissioning of the superconducting ECR ion source VENUS  

E-Print Network (OSTI)

COMMISSIONING OF THE SUPERCONDUCTING ECR ION SOURCE VENUS *paper describes the ongoing commissioning. Initial resultscoils [2]. During commissioning of the superconducting

Leitner, Daniela; Abbott, Steve R.; Dwinell, Roger D.; Leitner, Matthaeus; Taylor, Clyde; Lyneis, Claude M.

2003-01-01T23:59:59.000Z

448

PP-54 Ontario Hydro Electric Power Commission | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Ontario Hydro Electric Power Commission PP-54 Ontario Hydro Electric Power Commission Presidential Permit authorizing Ontario Hydro Electric Power Commission to construct,...

449

FTC data analysis. [Federal Trade Commission  

SciTech Connect

Manufacturers of 5 major consumer products submitted energy efficiency and related data to the Federal Trade Commission during late 1979 and early 1980 in response to energy-efficiency labeling and representations requirements. This report documents an analysis of these data as conducted by Vitro Laboratories. Data were submitted on five products: furnaces, water heaters, room air conditioners, refrigerators and refrigerator-freezers, and freezers. The submittals include information on manufacturer model number, estimated annual energy cost or the energy-efficiency rating, the number of tests performed on each basic model, and the capacity of each appliance model. Pattern analyses on these variables are presented, but it is observed that few common patterns for the five products exist. The unique patterns for each product are discussed.

Not Available

1981-02-11T23:59:59.000Z

450

Natural Gas Transmission Pipeline Intrastate Regulatory Act (Florida) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Pipeline Intrastate Regulatory Act Transmission Pipeline Intrastate Regulatory Act (Florida) Natural Gas Transmission Pipeline Intrastate Regulatory Act (Florida) < Back Eligibility Commercial Construction Developer Fuel Distributor Industrial Investor-Owned Utility Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Utility Program Info State Florida Program Type Safety and Operational Guidelines Provider Florida Public Service Commission The regulation of natural gas intrastate transportation and sale is deemed to be an exercise of the police power of the state for the protection of the public welfare. The Public Service Commission is empowered to fix and regulate rates and services of natural gas transmission companies, including, without limitation, rules and regulations for determining the

451

Beyond Commissioning: The Role of Automation  

Science Conference Proceedings (OSTI)

This article takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that's performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. The article then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

Brambley, Michael R.; Katipamula, Srinivas

2005-02-01T23:59:59.000Z

452

Topic: Regulatory & Policy Recommendations  

Science Conference Proceedings (OSTI)

... Regulatory & Policy Recommendations. The impact of regulations and policies on the manufacturing industry in areas such as tax, energy, trade ...

2013-11-19T23:59:59.000Z

453

DEPARTMENT OF ENERGY Reducing Regulatory Burden  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Billing Code 6450 01-P Billing Code 6450 01-P DEPARTMENT OF ENERGY Reducing Regulatory Burden AGENCY: Office of the General Counsel, Department of Energy. ACTION: Request for information. SUMMARY: As part of its implementation of Executive Order 13563, "Improving Regulation and Regulatory Review," issued by the President on January 18, 2011, the Department of Energy (DOE) is seeking comments and information from interested parties to assist DOE in reviewing its existing regulations to determine whether any such regulations should be modified, streamlined, expanded, or repealed. The purpose of DOE's review is to make the agency's regulatory program more effective and less burdensome in achieving its regulatory objectives. DATES: Written comments and information are requested on or before 45 days after

454

STATE OF CALIFORNIA --NATURAL RESOURCES AGENCY EDMUND G. BROWN JR., Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

-owned utilities, electric service providers, small and multi- jurisdictional utilities, and community choice aggregators, to submit 2008-2010 retail sales data and procurement information to the Energy Commission

455

NIST Blue Ribbon Commission on Management and Safety ? ...  

Science Conference Proceedings (OSTI)

NIST Blue Ribbon Commission on Management and Safety II. The NIST Blue Ribbon Commission on Management and ...

2012-08-27T23:59:59.000Z

456

NIST Blue Ribbon Commission on Management and Safety ...  

Science Conference Proceedings (OSTI)

... See NIST Blue Ribbon Commission on Management and Safety II. NIST Blue Ribbon Commission on Management and Safety. ...

2010-10-05T23:59:59.000Z

457

Environmental regulatory update table: September/October 1994  

SciTech Connect

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlberg, L.M.; Hawkins, G.T.; Bock, R.E.; Salk, M.S.

1994-11-01T23:59:59.000Z

458

Environmental sciences division: Environmental regulatory update table July 1988  

Science Conference Proceedings (OSTI)

The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Langston, M.E.; Nikbakht, A.; Salk, M.S.

1988-08-01T23:59:59.000Z

459

Environmental Regulatory Update Table, November--December 1993  

SciTech Connect

The Environmental Regulatory Update Table provides information on regulatory of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.; Danford, G.S.; Lewis, E.B.

1994-01-01T23:59:59.000Z

460

UNITED STATES ATOMIC ENERGY COMMISSION  

Office of Legacy Management (LM)

I(S.0 -01: I(S.0 -01: SPECIAL NUCLEAR MATERIAL LlCEWSE Pursuant to the Atomic Energy Act of 1954 and Title 10, Code of Federal Regulations, Chapter 1, Part 70, "Special Nuclear Material Regulations," o. license is hereby issued authorizing the licensee to receive and possess the special nuclear material designated below; to use such special nuclear material for the purpose(s) and at the place(s) designated below; and to transfer such material to persons' authorized to receive it in accordance with the regulations in said Port. This license shall be deemed to contain the conditions specified in Section 70.32(a) of said regulations, and is subject to all applicable rules, regtdations, and orders of the Atomic Energy Commission now or hereafter in

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

LWRS II&C Industry and Regulatory Engagement Activities for FY 11  

Science Conference Proceedings (OSTI)

To ensure broad industry support and coordination for the Advanced Instrumentation, Information, and Controls (II&C) Systems Technologies research pathway, an engagement process will be continually pursued with nuclear asset owners, vendors, and suppliers, Nuclear Regulatory Commission (NRC), and the major industry support organizations of Electric Power Research Institute (EPRI), Institute of Nuclear Power Operations (INPO), and Nuclear Energy Institute (NEI). Nuclear asset owner engagement is a necessary and enabling activity to obtain data and accurate characterization of long-term operational challenges, assess the suitability of proposed research for addressing long-term needs, and gain access to data and representative infrastructure and expertise needed to ensure success of the proposed research and development (R&D) activities. Engagement with vendors and suppliers will ensure that vendor expectations and needs can be translated into requirements that can be met through technology commercialization.

Ken Thomas

2011-09-01T23:59:59.000Z

462

The Operation of the Low Pay Commission  

E-Print Network (OSTI)

were the Human Resources Director of a major hotel and catering group, the Human Resources Policy Director (later promoted to Deputy Director-General) of the Confederation of British Industry, and the Chief Executive of a retailers federation... of the Commission, to the Inland Revenue which tackled the task with energy, imagination and common sense. The Government also simplified the Commissions task by prejudging certain aspects of the National Minimum Wage. Particularly important was that it should...

Brown, William

2004-06-16T23:59:59.000Z

463

Energy Programs of the Texas Industrial Commission  

E-Print Network (OSTI)

The objectives of the Industrial Energy Conservation Program are to assist Texas industry in using energy more efficiently through seminars, workshops, technical information exchange and other supportive programs with the goal of conserving at least 283.81 trillion BTU's of industrial energy in 1980. As the primary consumer of Texas' energy (54% of total, industry is a major focal point of the state's energy conservation effort. Although industry's overall record of energy conservation is good, such a large consumer must receive serious attention in any plan aimed at improving the overall efficiency of energy use in the state. The Texas Industrial Commission has been designated lead agency of the industrial conservation effort, and as such, created the Energy Utilization Department in the Fall of 1977. The multi-faceted department has established programs to accomplish its mission including: The Energy Search Center, an information access point for Texas manufacturers; a series of technical workshops and seminars; an annual Industrial Energy Technology Conference; the coordination of a university program for the training of industrial energy auditors; and organizational assistance in the establishment of regional energy conservation groups. Although manufacturers are encouraged to utilize the programs, they are designed primarily for small or medium-sized industries and low-technology operations where the employment of an energy specialist is economically impractical.

Heare, J.; dePlante, L. E.

1979-01-01T23:59:59.000Z

464

Regional Districts, Commissions, and Authorities (South Carolina) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regional Districts, Commissions, and Authorities (South Carolina) Regional Districts, Commissions, and Authorities (South Carolina) Regional Districts, Commissions, and Authorities (South Carolina) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State South Carolina Program Type Siting and Permitting Provider Regional Districts, Commissions, and Authorities

465

Existing Building Commissioning (EBCx) Project Considerations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Existing Building Existing Building Commissioning (EBCx) Project Considerations Phil Welker, Executive Director PECI 2 Mapping Out Your Commissioning Strategy Three big questions: 1. Which buildings are commissioning candidates? 2. What commissioning approach(es) should I employ? 3. What expertise do I need to get it done? 3 Which buildings? Many factors come in to play: * Building sizes * Project budgets * Current energy performance * Building control systems * Occupancy rates * Operator/ engineering resources * Long term investment strategy * Sustainability plans or mandates * Equipment Replacements Selecting the right buildings is critical to achieve the maximum benefit in a cost-efficient manner. See the EPA's "A Retrocommissioning Guide for Building Owners"

466

Commission on Energy Efficiency Standards and Practices  

NLE Websites -- All DOE Office Websites (Extended Search)

Final Report to the Governor Final Report to the Governor and the Iowa General Assembly Submitted in Compliance with Iowa Code Section 103A.27 January1, 2011 Commission on Energy Efficiency Standards and Practices Commission on Energy Efficiency Standards and Practices 2 Table of Contents Commission Members page 3 Executive Summary page 4 Summary of Recommendations page 5 Legislative Overview page 12 Profile on Iowa's Energy Usage page 14 Commission Proceedings page 15 Recommendations Energy Code Adoption & Compliance page 20 Financing & Incentives page 25 Training and Education page 29 Licensing and Certification page 31 Additional Energy Efficiency Recommendations page 32

467

Step 5: Commission the building | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

Specify detailed commissioning activities in the project contracts. Ensure that your architect or engineer transfers technical documents to the building's operations and...

468

ORLANDO UTILITIES COMMISSION RFP No. 2400 QQ  

NLE Websites -- All DOE Office Websites (Extended Search)

ORLANDO UTILITIES COMMISSION REQUEST FOR PROPOSAL For GREEN ENERGY PROGRAM RFP NO. 2400 OQ COMMISSIONERS LONNIE C. BELL President KATIE PORTA First Vice President MAYLEN DOMINGUEZ...

469

A History of the Atomic Energy Commission  

Energy.gov (U.S. Department of Energy (DOE))

A History of the Atomic Energy Commission - written by Alice L. BuckWashington, D.C.: U.S. Department of Energy, July 1983.41 pp.

470

County Land Preservation and Use Commissions (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

This ordinance creates Land Preservation and Use Commissions in each county to provide for the orderly use and development of land, to protect agricultural land from nonagricultural development,...

471

IMAGINE Officially Starts Commissioning | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

The IMAGINE team present for the official start of commissioning. Doug Selby, HFIR instrument coordinator, hands the shutter keys to IMAGINE instrument scientist Flora...

472

SNS BEAM COMMISSIONING TOOLS AND EXPERIENCE  

Science Conference Proceedings (OSTI)

The Spallation Neutron Source (SNS) successfully met the primary construction project completion milestones in April 2006. An important ingredient of this successful commissioning was the development and use of software tools. With the increasing digitalization of beam diagnostics and increasing complexity of Integrated Control Systems of large accelerators, the need for high level software tools is critical for smooth commissioning. At SNS a special Java based infrastructure called XAL was prepared for beam commissioning. XAL provides a hierarchal view of the accelerator, is data base configured, and includes a physics model of the beam. This infrastructure and individual applications development along with a historical time line of the SNS commissioning will be discussed.

Shishlo, Andrei P [ORNL; Galambos, John D [ORNL

2008-01-01T23:59:59.000Z

473

California Energy Commission - Electricity Consumption by Planning...  

Open Energy Info (EERE)

Planning Area (1990-2009) Electricity consumption data from the California Energy Commission by planning area for Commercial, Residential, Ag & Water Pump, Streetlight,...

474

Commissioning Residential Ventilation Systems: A Combined Assessment of  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning Residential Ventilation Commissioning Residential Ventilation Systems: A Combined Assessment of Energy and Air Quality Potential Values William J.N. Turner, Jennifer M. Logue, Craig P. Wray Environmental Energy Technologies Division July 2012 LBNL-5969E Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor the Regents of the University of California, nor any of their employees, makes any warranty, express or implied, or assumes any legal responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein

475

Automated Commissioning for Lower-Cost, Widely Deployed Building Commissioning of the Future  

Science Conference Proceedings (OSTI)

This book chapter takes a brief look at the benefits of building commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems.

Brambley, Michael R.; Katipamula, Srinivas

2007-01-31T23:59:59.000Z

476

Nuclear Safety Regulatory Framework  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy Department of Energy Nuclear Safety Regulatory Framework DOE's Nuclear Safety Enabling Legislation Regulatory Enforcement & Oversight Regulatory Governance Atomic Energy Act 1946 Atomic Energy Act 1954 Energy Reorganization Act 1974 DOE Act 1977 Authority and responsibility to regulate nuclear safety at DOE facilities 10 CFR 830 10 CFR 835 10 CFR 820 Regulatory Implementation Nuclear Safety Radiological Safety Procedural Rules ISMS-QA; Operating Experience; Metrics and Analysis Cross Cutting DOE Directives & Manuals DOE Standards Central Technical Authorities (CTA) Office of Health, Safety, and Security (HSS) Line Management SSO/ FAC Reps 48 CFR 970 48 CFR 952 Federal Acquisition Regulations External Oversight *Defense Nuclear Facility

477

DSW REGULATORY AND RESTRUCTURING  

NLE Websites -- All DOE Office Websites (Extended Search)

Committee on Appropriations House Committee on Appropriations Photo of lineman repairing transmission lines in desert Western's Regulatory & Restructuring Project Managers Ron...

478

Other Regulatory Efforts  

Energy.gov (U.S. Department of Energy (DOE))

In addition to regulating international electricity trade, the Office of Electricity Delivery and Energy Reliability participates in other regulatory activities. These include:

479

Restrospective Regulatory Review  

Energy.gov (U.S. Department of Energy (DOE))

On January 18, 2011, President Obama issued Executive Order 13563, Improving Regulation and Regulatory Review, which directs federal agencies, among other things, to review existing regulations and...

480

FPCC Regulatory Barriers Submittal  

Energy.gov (U.S. Department of Energy (DOE))

The Federal Performance Contracting Coalition (FPCC) appreciates the opportunity to comment on reducing regulatory burdens on the Federal government, specifically as they pertain to federal energy...

Note: This page contains sample records for the topic "regulatory commission information" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Yale and the Atomic Bomb Casualty Commission Consultant,  

E-Print Network (OSTI)

This is a description, based largely on personal discussions, of the contributions of men from the Yale University School of Medicine to the saga of the immediate and long-term studies on the medical effects of the atomic bombs at Hiroshima and Nagasaki. They played key roles in the immediate studies of bomb effects, in the creation of long-term studies of delayed effects, and in elevating the Atomic Bomb Casualty Commission after 1955 to a position of excellence in its studies and relations with the Japanese. The accumulation of the information presented in this paper derives from research for the preparation of the history of the Atomic Bomb Casualty Commission. In 1975, the commission was passed to Japanese leadership as the Radiation Effects Research Foundation. Yale holds a rich tradition of involvement in the Orient, extending for one and a half centuries. An important contribution was a major role in the creation of the Atomic Bomb Casualty Commission in 1946 and its resurgence to a position of major strength in the late 1950s. The significance of Yale in the Orient goes back to September 1834 when Peter Parker, who had trained in theology and medicine, arrived in Canton as the first

John Z. Bowers

1945-01-01T23:59:59.000Z

482

Demand Response & Smart Grid - State Legislative and Regulatory Policy  

Open Energy Info (EERE)

Demand Response & Smart Grid - State Legislative and Regulatory Policy Demand Response & Smart Grid - State Legislative and Regulatory Policy Actions: October 2008 to May 2010 Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Demand Response & Smart Grid - State Legislative and Regulatory Policy Actions: October 2008 to May 2010 Focus Area: Energy Efficiency, - Utility Topics: Socio-Economic Website: www.demandresponsesmartgrid.org/Resources/Documents/State%20Policy%20S Equivalent URI: cleanenergysolutions.org/content/demand-response-smart-grid-state-legi Language: English Policies: Regulations Regulations: Enabling Legislation This report reviews the implementation of utility efficiency programs in the United States at both the state and federal levels. In addition, the updated report catalogues regulatory commission action, independent of

483

Regulatory Guide 5.29, Revision 2, "Special Nuclear Material Control and Accounting Systems for Nuclear Power Plants".  

National Nuclear Security Administration (NNSA)

U.S. NUCLEAR REGULATORY COMMISSION June 2013 U.S. NUCLEAR REGULATORY COMMISSION June 2013 Revision 2 REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH Written suggestions regarding this guide or development of new guides may be submitted through the NRC's public Web site under the Regulatory Guides document collection of the NRC Library at http://www.nrc.gov/reading-rm/doc-collections/reg-guides/contactus.html. Electronic copies of this regulatory guide, previous versions of this guide, and other recently issued guides are available through the NRC's public Web site under the Regulatory Guides document collection of the NRC Library at http://www.nrc.gov/reading-rm/doc-collections/. The regulatory guide is also available through the NRC's Agencywide Documents Access and Management System (ADAMS) at

484

Regulatory and technical reports (abstract index journal). Volume 20, No. 2: Compilation for second quarter April--June 1995  

Science Conference Proceedings (OSTI)

This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC`s intention to publish this compilation quarterly and to cumulate it annually.

NONE

1995-09-01T23:59:59.000Z

485

Federal Communications Commission Cyber Security ...  

Science Conference Proceedings (OSTI)

... Chief Information Officer for 25 Years ... the United Nations Under Secretary General and CIO ... after he hacked into a federal investigation database. ...

2011-11-15T23:59:59.000Z

486

Notice of Decision by the California Energy Commission To: California Resources Agency From: California Energy Commission  

E-Print Network (OSTI)

Notice of Decision by the California Energy Commission To: California Resources Agency From: California Energy Commission 1416 9th Street, Room 1311 1516 9th Street MS-2000 Sacramento, CA 95814 21080.5 and Title 20, California Code of Regulations, Section 1768 Project Name: 1 Energy Commission

487

Regulatory incentives and prudence reviews  

Science Conference Proceedings (OSTI)

During the past several years, numerous large prudence case disallowances have occurred throughout the United States. Many of these cases concerned the construction of large nuclear facilities. Disallowances occurred despite the presence of incentive mechanisms that were used by various state public utility commissions. The regulatory model used during that period assumed that incentives were useful. Incentives were often viewed, however, as an exploratory exercise that might provide benefits. Still, the real mechanism used to protect ratepayers was the classical prudence case. And, as we saw during the 1980s, such cases were frequently used to prohibit utilities from passing unreasonable costs on to ratepayers. To avoid the system breakdowns and the resulting prudence cases, utilities and regulators must develop incentives that affect utilities' behavior to provide an optimal level of safe and adequate service at the lowest reasonable cost. If the incentives are simply viewed as an exotic regulatory mechanism, without being properly understood and implemented from an operational perspective at the utilities, they may not produce the desired outcome. In some instances they may be irrelevant to the final result. Several relatively new incentive mechanisms are promising. These include incentives that provide utilities with increased profits for implementing good customer-service programs or for achieving good performance in demand-side management (DSM) programs. Those incentives usually link a monetary reward or penalty in the form of a change to the earned rate of return to specific actions, such as the customer complaint rate for the utility or its success in installing certain DSM devices. These are promising because they relate to discrete events that can be easily understood by utility management and measured by regulators.

Bronner, K.M.

1993-12-01T23:59:59.000Z

488

Implementation Update Black and Gold Commission  

E-Print Network (OSTI)

Implementation Update Black and Gold Commission June, 2003 1 Action Item/ Major Initiative Outcomes Policies and Practices of UWM with principles and goals of Black & Gold Commission UWM culture supports Senate; Student Association; Classified Employee Groups; Deans & Division Heads Spirit of the Black

Saldin, Dilano

489

California Solar Initiative California Public Utilities Commission  

E-Print Network (OSTI)

for solar energy by dramatically reducing the cost of solar. As part of the statewide solar effort, the CPUC of the state's solar offerings, such as the California Energy Commission's (Energy Commission) New Solar Homes Renewable Energy Council (IREC) released Larry Sherwood's U.S. Solar Market Trends for 2007 report

490

Commissioning of the T2K Beamline  

Science Conference Proceedings (OSTI)

The initial commissioning of the beam line for the T2K long baseline neutrino experiment was carried out in April and May of 2009. This paper contains an overview of the beam line components and presents initial results from the beam line commissioning.

Hartz, Mark [Department of Physics, University of Toronto, 60 St. George St., Toronto, M5S 1A7, Ontario (Canada)

2010-03-30T23:59:59.000Z

491

California Energy Commission DRAFT COMMITTEE REPORT  

E-Print Network (OSTI)

of the Energy Commission until the report is adopted. #12;i ABSTRACT These proposed electricity supply forms demand for energy and annual peak load will be met by specific supply resources. California Energy Commission. Electricity Supply Analysis Division. CEC2002010009CTD. #12;ii #12

492

Control System Commissioning for Enhanced Building Operations  

E-Print Network (OSTI)

This paper highlights the import role control systems play in the operation of modern buildings and describes ways to improve the final stage of commissioning. We also describe practical issues associated with modern IT-oriented control systems that can impact a commissioning exercise.

Salsbury, T. I.; Singhal, A.

2003-01-01T23:59:59.000Z

493