Powered by Deep Web Technologies
Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

NUCLEAR REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 21, 1999 (Volume 64, Number 244)] December 21, 1999 (Volume 64, Number 244)] [Proposed Rules] [Page 71331-71333] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr21de99-21] ======================================================================= ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION 10 CFR Parts 71 and 73 RIN 3150-AG41 Advance Notification to Native American Tribes of Transportation of Certain Types of Nuclear Waste AGENCY: Nuclear Regulatory Commission. ACTION: Advance notice of proposed rulemaking. ----------------------------------------------------------------------- SUMMARY: The Nuclear Regulatory Commission (NRC) is considering an amendment to its regulations that would require NRC licensees to notify

2

Nuclear Regulatory Commission issuances  

Science Conference Proceedings (OSTI)

This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

Not Available

1994-03-01T23:59:59.000Z

3

Nuclear Regulatory Commission issuances  

SciTech Connect

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

NONE

1997-11-01T23:59:59.000Z

4

Nuclear Regulatory Commission issuances  

Science Conference Proceedings (OSTI)

This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

NONE

1996-04-01T23:59:59.000Z

5

THE FEDERAL ENERGY REGULATORY COMMISSION'S UNCLASSIFIED CYBER...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

THE FEDERAL ENERGY REGULATORY COMMISSION'S UNCLASSIFIED CYBER SECURITY PROGRAM 2002, IG-0569 THE FEDERAL ENERGY REGULATORY COMMISSION'S UNCLASSIFIED CYBER SECURITY PROGRAM 2002,...

6

Commissioning  

SciTech Connect

Building managers often find that HVAC, lighting and other systems in new buildings need adjustments and modifications. The owner, architect and contractor may mistakenly assume that all of a building`s systems--architectural, mechanical, control and electrical--function according to the design intent. Thus, energy managers can optimize their building`s performance through commissioning, a process that looks for and corrects the defects in a building` operating system or design, immediately before and after it is occupied (following construction or renovation).

Huta, L.G.

1995-12-01T23:59:59.000Z

7

United States Nuclear Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

qU oSoLTJRC qU oSoLTJRC United States Nuclear Regulatory Commission Protecting People and the Environment NUREG-1872, Vol. 2 HudcD [jE©wftamfsýýpc Wafm(M oran EA Office of New Reactors AVAILABILITY OF REFERENCE MATERIALS IN NRC PUBLICATIONS NRC Reference Material As of November 1999, you may electronically access NUREG-series publications and other NRC records at NRC's Public Electronic Reading Room at http:t/www.nrc..ov/reading-rm.html. Publicly released records include, to name a few, NUREG-series publications; Federal Register notices; applicant, licensee, and vendor documents and correspondence; NRC correspondence and internal memoranda; bulletins and information notices; inspection and investigative reports; licensee event reports; and Commission papers and their attachments.

8

Reliability and the Federal Energy Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and the Federal Reliability and the Federal and the Federal Reliability and the Federal Energy Regulatory Energy Regulatory Commission Commission Michael Peters Michael Peters Energy Infrastructure & Cyber Security Advisor Energy Infrastructure & Cyber Security Advisor Federal Energy Regulatory Commission Federal Energy Regulatory Commission 202 202 - - 502 502 - - 8461 8461 Michael.Peters@FERC.GOV Michael.Peters@FERC.GOV The views expressed in this The views expressed in this presentation do not represent the presentation do not represent the views of the Federal Energy views of the Federal Energy Regulatory Commission or the United Regulatory Commission or the United States. States. These views are the personal opinion These views are the personal opinion of Mike Peters!!!! of Mike Peters!!!! ☺ ☺ ☺ ☺ ☺ ☺

9

Regulatory Commission of Alaska | Open Energy Information  

Open Energy Info (EERE)

Regulatory Commission of Alaska Regulatory Commission of Alaska Jump to: navigation, search Logo: Regulatory Commission of Alaska Name Regulatory Commission of Alaska Address 701 West Eight Ave., Suite 300 Place Anchorage, Alaska Zip 99501-3469 Phone number 907-276-6222 Website http://rca.alaska.gov/RCAWeb/h Coordinates 61.2143463°, -149.8931523° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":61.2143463,"lon":-149.8931523,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

10

Federal Energy Regulatory Commission | Open Energy Information  

Open Energy Info (EERE)

Energy Regulatory Commission Energy Regulatory Commission Jump to: navigation, search Logo: Federal Energy Regulatory Commission Name Federal Energy Regulatory Commission Address 888 First Street, N.E. Place Washington, District of Columbia Zip 20426 Phone number 1-866-208-3676 Website http://www.ferc.gov/contact-us Coordinates 38.90145°, -77.006248° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.90145,"lon":-77.006248,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

11

Department of Energy and Nuclear Regulatory Commission Increase...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership Department of Energy and Nuclear Regulatory Commission Increase Cooperation to...

12

Energy Praises the Nuclear Regulatory Commission Approval of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the...

13

NUCLEAR REGULATORY,.COMMISSION REGION I  

Office of Legacy Management (LM)

REGULATORY,.COMMISSION REGULATORY,.COMMISSION REGION I lY,.COMMISSION 475 ALLENDALE ROAD KlNG OF PRUSSIA. PENNSYLVANIA 194061415 GION I NOALE ROAD ENNSYLVANlA 194061415 MAY I5 1996 MAY I5 1996 Docket No. 040-07964 License No. SlJ (Rs Heyman Properties Attention: Mr. John S. Russo Facility Manager 333 Post Road West Westport, CT 06881 SUBJECT: INSPECTION NO. 040-07964/96-001 Dear Mr. Russo: On April 15, 1996, Todd J. Jackson of this office conducted a routine inspection at 737 Canal Street, Stamford, Connecticut of activities o Oliver Incorporated, authorized by Atomic Energy Commission (AEC) Lit SUB-00967. The inspection consisted of observations by the inspect0 interviews with personnel, and a radiological survey by the inspector Jackson was accompanied on this inspection by representatives of the

14

Nuclear Regulatory Commission Regulatory and Licensing Matters | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Commission Regulatory and Licensing Matters Regulatory Commission Regulatory and Licensing Matters Nuclear Regulatory Commission Regulatory and Licensing Matters GC-52 provides legal advice to DOE regarding Nuclear Regulatory Commission (NRC) regulatory and licensing matters of interest to DOE, either as an NRC license applicant or in connection with related authorities and responsibilities of DOE and NRC on nuclear material, nuclear waste, and nuclear nonproliferation matters. GC-52 attorneys provide advice and support on a variety of NRC matters including regulation and licensing of DOE independent spent fuel storage facilities (ISFSIs) and a mixed-oxide fuel fabrication facility, consultation with NRC on certain DOE waste determinations, and imports and exports of nuclear materials and radioactive sealed sources.

15

Nuclear Regulatory Commission Information Digest, 1991 edition  

Science Conference Proceedings (OSTI)

The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs.

Olive, K L

1991-03-01T23:59:59.000Z

16

UNITED STATES NUCLEAR REGULATORY COMMISSION  

Office of Legacy Management (LM)

WASHINGTON, 0. C. 20555 WASHINGTON, 0. C. 20555 AUG i 3 1979 ,,~---Y--*. FCAF:Wi3 )I 70-364 : i: SNM-414,jAmendment No. 3 --A Babcock and Wilcox Company Nuclear Materials Division ATTN: Mr. Michael A. Austin Manager, Technical Control 609 North Warren Avenue Apollo, Pennsylvania 15613 Gentiemen: (1 i' \ (. \ In accordance with your application dated June 18, 1979, and pursuant to Title 10, Code of Federal Regulations, Part 70, Materials License SNM-414 is hereby amended to: 1. Delete the function of the Regulatory Projects Coordinator, and 2. Alter the experience requirements for the function of Licensing and Nuclear Safety Specialist. Replacement pages for the license and condition section of the application are attached. Included are changes to License SNM-414 pages to reflect

17

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555  

Office of Legacy Management (LM)

REGULATORY COMMISSION REGULATORY COMMISSION WASHINGTON, D. C. 20555 JAN 2 2 1982 -/ Departmznt'of Ene,rgy ATTN : Dr. William E. Mott, Director Environmental and Safety Engineering Division (EP-32) Washington, D.C. 20545 Dear Dr. Mott: Enclosed is the list of contaminated'or potentially contaminated sites that I promised to send you during our recent meeting. The sites have been broken down into the followi,ng four categories: 1. Sites with known contamination that have never been 1 icensed. 2. Formerly licensed sites with known contamination. 3. Currently licensed sites that are being decontaminated prior to decoronissioning. 4. A list of formerly licensed sites that need to be visited to determine if they have been properly decontaminated prior to decommissioning.

18

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COMMISSION COMMISSION ) In the Matter of ) July 19,2010 1 U.S. DEPARTMENT OF ENERGY 1 Docket No. 63-001-HLW 1 (High Level Waste Repository 1 Construction Authorization Application) ) ) U.S. DEPARTMENT OF ENERGY'S REPLY BRIEF IN SUPPORT OF REVIEW AND REVERSAL OF THE BOARD'S RULING ON THE MOTION TO WITHDRAW Scott Blake Harris Donald P. Irwin Sean A. Lev Michael R. Shebelskie James Bennett McRae HUNTON & WILLIAMS LLP U.S. DEPARTMENT OF ENERGY Riverfront Plaza, East Tower Office of General Counsel 95 1 East Byrd Street Department of Energy Richmond, Virginia 232 19-4074 1000 Independence Avenue, S. W. Washington, D.C. 20585 Counsel for the U.S. Department of Energy Table of Contents Page . . ........................................................................................................................ Table of Authorities

19

Regulatory Commission (Commission) directs the North American Electric Reliability  

E-Print Network (OSTI)

submit to the Commission for approval proposed Reliability Standards that address the impact of geomagnetic disturbances (GMD) on the reliable operation of the Bulk-Power System. The Commission directs NERC to implement the directive in two stages. In the first stage, NERC must submit, within six months of the effective date of this Final Rule, one or more Reliability Standards that require owners and operators of the Bulk-Power System to develop and implement operational procedures to mitigate the effects of GMDs consistent with the reliable operation of the Bulk-Power System. In the second stage, NERC must submit, within 18 months of the effective date of this Final Rule, one or more Reliability Standards that require owners and operators of the Bulk-Power System to conduct initial and on-going assessments of the potential impact of benchmark GMDDocket No. RM12-22-000- 2-events on Bulk-Power System equipment and the Bulk-Power System as a whole. The Second Stage GMD Reliability Standards must identify benchmark GMD events that specify what severity GMD events a responsible entity must assess for potential impacts on the Bulk-Power System. If the assessments identify potential impacts from benchmark GMD events, the Reliability Standards should require owners and operators

Cfr Part

2013-01-01T23:59:59.000Z

20

Department of Energy and Nuclear Regulatory Commission Increase Cooperation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Regulatory Commission Increase Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership Department of Energy and Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership July 17, 2007 - 2:55pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) and Nuclear Regulatory Commission (NRC) expanded cooperation for President Bush's Global Nuclear Energy Partnership (GNEP) through a Memorandum of Understanding (MOU) that was signed on Friday by DOE's GNEP Deputy Program Manager Paul Lisowski and NRC Executive Director for Operations Luis Reyes. The MOU establishes the foundation for increased cooperation between DOE and NRC on technological research and engineering studies and marks another important milestone

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission  

National Nuclear Security Administration (NNSA)

Federal Register Vol. 76, No. 83 Friday, April 29, 2011 Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Project No. 14147-000 Storage Development...

22

Federal Energy Regulatory Commission fiscal year 1997 annual financial statements  

Science Conference Proceedings (OSTI)

This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

NONE

1998-02-24T23:59:59.000Z

23

Federal Energy Regulatory Commission`s fiscal year 1996 financial statement audit  

SciTech Connect

This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statement of financial position and the related statements of operations and changes in net position.

NONE

1997-02-14T23:59:59.000Z

24

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STATES OF AMERICA STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon NOTICE OF AVAILABILITY OF ENVIRONMENTAL ASSESSMENT (December 3, 2010) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Reedsport OPT Wave Park, LLC's application for license for the Reedsport OPT Wave Park Project

25

Safety Culture in the US Nuclear Regulatory Commission's Reactor Oversight  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety Culture in the US Nuclear Regulatory Commission's Reactor Safety Culture in the US Nuclear Regulatory Commission's Reactor Oversight Process Safety Culture in the US Nuclear Regulatory Commission's Reactor Oversight Process September 19, 2012 Presenter: Undine Shoop, Chief, Health Physics and Human Performance Branch, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission Topics covered: Purpose of the Reactor Oversight Process (ROP) ROP Framework Safety Culture within the ROP Safety Culture Assessments Safety Culture in the US Nuclear Regulatory Commission's Reactor Oversight Process More Documents & Publications A Commissioner's Perspective on USNRC Actions in Response to the Fukushima Nuclear Accident Comparison of Integrated Safety Analysis (ISA) and Probabilistic Risk Assessment (PRA) for Fuel Cycle Facilities, 2/17/11

26

Work for Nuclear Regulatory Commission, Safety Related Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Regulatory Nuclear Regulatory Commission Capabilities Sensors and Instrumentation and Nondestructive Evaluation Overview Energy System Applications Safety-Related Applications Overview DOE Office of Nuclear Energy, Science, and Technology Nuclear Regulatory Commission National Aeronautics and Space Administration (NASA) Homeland Security Applications Biomedical Applications Millimiter Wave Group Papers Other NPNS Capabilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Sensors and Instrumentation and Nondestructive Evaluation Safety Related Applications Bookmark and Share Nuclear Regulatory Commission International Steam Generator Tube Integrity Program Key objectives of the International Steam Generator Tube Integrity Program

27

Nuclear Regulatory Commission issuances, August 1987  

Science Conference Proceedings (OSTI)

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

Not Available

1987-08-01T23:59:59.000Z

28

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FEDERAL ENERGY REGULATORY COMMISSION FEDERAL ENERGY REGULATORY COMMISSION ) Emergency Petition and Complaint of ) Docket No. EL05-145-000 District of Columbia Public Service Comm'n ) ) POTOMAC ELECTRIC POWER COMPANY'S MOTION TO INTERVENE AND COMMENT IN SUPPORT OF EMERGENCY PETITION AND COMPLAINT Pursuant to Rules 211 and 214 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission ("FERC" or the "Commission"), 18 C.F.R. §§ 385.211 and 385.214 (2004), Potomac Electric Power Company ("Pepco") hereby moves to intervene in the above-captioned proceeding and supports the August 24, 2005 Emergency Petition and Complaint filed by the District of Columbia Public Service Commission ("DC PSC"). As discussed below, Mirant Corporation and its public utility subsidiaries (collectively, "Mirant")

29

Indexes to Nuclear Regulatory Commission Issuances  

SciTech Connect

Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index.

NONE

1996-12-31T23:59:59.000Z

30

Energy Praises the Nuclear Regulatory Commission Approval of the First  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Praises the Nuclear Regulatory Commission Approval of the Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years March 8, 2007 - 10:28am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today commended the Nuclear Regulatory Commission's decision to approve the first-ever Early Site Permit (ESP) for the Exelon Generation Company's Clinton site, in central Illinois. This decision marks a major milestone in the President's plan to expand the use of safe and clean nuclear power. As part of President Bush's Advanced Energy Initiative - which seeks to change the way we power this nation - nuclear power will play an increasingly

31

Department of Energy Commends the Nuclear Regulatory Commission's Approval  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commends the Nuclear Regulatory Commission's Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month Department of Energy Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month March 27, 2007 - 12:10pm Addthis The Entergy Corporation's Grand Gulf Site in Mississippi Receives NRC Approval for an ESP WASHINGTON, DC - The U.S. Department of Energy (DOE) today applauded the Nuclear Regulatory Commission's (NRC) decision to approve an Early Site Permit (ESP) for the Entergy Corporation's Grand Gulf Nuclear Station in Mississippi. This approval, the second ESP this month, demonstrates another major milestone in President Bush's Advanced Energy Initiative, which plans to expand the use of safe and clean nuclear power. Earlier this

32

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FEDERAL ENERGY REGULATORY COMMISSION FEDERAL ENERGY REGULATORY COMMISSION ) Emergency Petition and Complaint of ) Docket No. EL05-145-000 District of Columbia Public Service Comm'n ) ) POTOMAC ELECTRIC POWER COMPANY'S MOTION FOR LEAVE TO ANSWER AND ANSWER TO COMMENTS AND PROTESTS Pursuant to Rules 212 and 213 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission ("FERC" or the "Commission"), 18 C.F.R. §§ 385.212 and 385.213 (2005), Potomac Electric Power Company ("Pepco") hereby (i) moves for leave to answer and (ii) answers certain of the comments and protests filed in the above-captioned proceeding. 1 I. BACKGROUND 2 On August 24, 2005, Mirant 3 shut down the Potomac River generating station in Alexandria, Virginia (the "Potomac River Plant" or the "Plant") without authority from any court

33

Federal Energy Regulatory Commission's Fiscal Year 2010 Financial Statement Audit  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2010 9, 2010 REPLY TO ATTN TO: IG-34 (A10FN002) SUBJECT: Federal Energy Regulatory Commission's Fiscal Year 2010 Financial Statement Audit Report No.: OAS-FS-11-02 TO: Chairman, Federal Energy Regulatory Commission The attached report presents the results of the independent certified public accountants' audit of the Federal Energy Regulatory Commission's (Commission) Fiscal Year 2010 balance sheet and the related statements of net cost, changes in net position, budgetary resources, and custodial activity. To fulfill the Office of Inspector General's audit responsibilities, we contracted with the independent public accounting firm of KPMG LLP (KPMG) to conduct the audit, subject to our review. KPMG is responsible for expressing an opinion on the

34

Executive Director for Operations CONSIDERATION OF ECONOMIC CONSEQUENCES WITHIN THE U.S. NUCLEAR REGULATORY COMMISSIONS REGULATORY FRAMEWORK  

E-Print Network (OSTI)

The purpose of this Commission paper (SECY) is to provide the Commission with information and options to address to what extent, if any, the U.S. Nuclear Regulatory Commissions (NRCs) regulatory framework should be modified regarding its consideration of the economic consequences of an unintended release of licensed nuclear materials to the environment. SUMMARY: The accident at the Fukushima Dai-ichi nuclear power plant in Japan initiated discussion of how the NRCs regulatory framework considers offsite property damage and other economic consequences caused by a significant radiological release from an NRC-licensed facility and licensed material. In response to this discussion, on April 6, 2012, the Office of the Executive Director for Operations (OEDO) directed the staff (see Enclosure 1, Tasking for RES) to provide a notation vote paper to the Commission on how the NRCs regulatory framework currently considers the economic consequences associated with the unintended 1 release of licensed nuclear material to the environment and alternatives for Commission consideration. CONTACT:

R. W. Borchardt; Alysia Bone Res/dra

2012-01-01T23:59:59.000Z

35

ORISE: U.S. Nuclear Regulatory Commission Radiation Exposure Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Information and Reporting System (REIRS) Information and Reporting System (REIRS) ORISE maintains large database of radiation exposure records for the U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Radiation Exposure Information and Reporting System (REIRS) The U.S. Nuclear Regulatory Commission (NRC) is required by federal mandate to maintain and evaluate radiation protection data for workers at facilities that it licenses. As part of its mission of safety, the NRC operates the Radiation Exposure Information and Reporting System (REIRS), a database system containing all occupational radiation exposure records that have been submitted to the NRC under 10 CFR Part 20. REIRS encompasses 1,800-plus NRC licensees and contains more than five million records for more than one million monitored individuals.

36

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BEFORE THE BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Emergency Petition and Complaint of ) Docket No. EL05-145-000 District of Columbia Public Service ) Commission ) MOTION FOR LEAVE TO ANSWER AND ANSWER OF POTOMAC ELECTRIC POWER COMPANY Pursuant to Rule 213 of the Commission's Rules of Practice and Procedure, 18 C.F.R. § 385.213, Potomac Electric Power Company ("Pepco") hereby moves for leave to answer and answers the Motion for Leave to File Consolidated Answer and Consolidated Answer of Robert G. Burnley, Director of the Commonwealth of Virginia Department of Environmental Quality filed on November 10, 2005 ("VDEQ Answer"). For the reasons detailed below, Pepco requests that the Commission reject VDEQ's Answer, or in the alternative, if the

37

US Nuclear Regulatory Commission organization charts and functional statements  

Science Conference Proceedings (OSTI)

This document contains organization charts for the U.S. Nuclear Regulatory Commission (NRC) and for the five offices of the NRC. Function statements are provided delineating the major responsibilities and operations of each office. Organization and function are provided to the branch level. The head of each office, division, and branch is also listed.

NONE

1997-11-01T23:59:59.000Z

38

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Trunkline LNG Company, LLC Docket No. PF12-8-000 Trunkline LNG Export, LLC Trunkline Gas Company, LLC SUPPLEMENTAL NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED LAKE CHARLES LIQUEFACTION PROJECT AND REQUEST FOR COMMENTS ON ENVIRONMENTAL ISSUES (March 21, 2013) As previously noticed on September 14, 2012, and supplemented herein, the staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental impact statement (EIS) that will discuss the environmental impacts of the Lake Charles Liquefaction Project involving construction and operation of facilities by Trunkline LNG Company, LLC; Trunkline LNG Export, LLC; and Trunkline Gas

39

Nuclear Regulatory Commission Issuances: February 1995. Volume 41, Number 2  

SciTech Connect

This book contains an issuance of the Nuclear Regulatory Commission and a Director`s Decision. The issuance concerns consideration by the Commission of appeals from both the Initial Decision and a Reconsideration Order issued by the Presiding Officer involving two materials license amendment applications filed by the University of Missouri. The Director`s Decision from the Office of Enforcement denies petitions filed by Northeast Utilities employees requesting that accelerated enforcement action be taken against Northeast Utilities for activities concerned with NU`s fitness-for-duty program.

NONE

1995-02-01T23:59:59.000Z

40

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FINAL ENVIRONMENTAL ASSESSMENT FINAL ENVIRONMENTAL ASSESSMENT (August 9, 2013) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects reviewed the Public Utility District No. 1 of Snohomish County, Washington's (Snohomish PUD) application for a 10-year license for the proposed Admiralty Inlet Pilot Tidal Project No. 12690, which would be located in Admiralty Inlet in Puget Sound, near the City of Port Townsend, in Island County, Washington, and has prepared a final environmental assessment (FEA) in cooperation with the U.S. Department of Energy (DOE/EA-1949). In the FEA, Commission staff analyzed the potential environmental effects of

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

33 Federal Register 33 Federal Register / Vol. 76, No. 180 / Friday, September 16, 2011 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RM98-1-000] Records Governing Off-the Record Communications Public Notice This constitutes notice, in accordance with 18 CFR 385.2201(b), of the receipt of prohibited and exempt off-the-record communications. Order No. 607 (64 FR 51222, September 22, 1999) requires Commission decisional employees, who make or receive a prohibited or exempt off-the-record communication relevant to the merits of a contested proceeding, to deliver to the Secretary of the Commission, a copy of the communication, if written, or a summary of the substance of any oral communication. Prohibited communications are included in a public, non-decisional file

42

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT (January 15, 2013) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects reviewed the Public Utility District No. 1 of Snohomish County, Washington's (Snohomish PUD) application for a 10-year pilot license for the proposed Admiralty Inlet Tidal Project No. 12690, which would be located in Admiralty Inlet in Puget Sound, near the City of Port Townsend, in Island County, Washington, and has prepared an environmental assessment (EA) in cooperation with the U.S. Department of Energy (DOE/EA-1949). In the EA, Commission staff analyzed the potential environmental effects of constructing and

43

Nuclear Regulatory Commission Information Digest 1994 edition. Volume 6  

SciTech Connect

The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRCs regulatory responsibility the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear-and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1993, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

Stadler, L.

1994-03-01T23:59:59.000Z

44

AGENCY: Federal Energy Regulatory Commission. ACTION: Final Rule.  

E-Print Network (OSTI)

SUMMARY: The Federal Energy Regulatory Commission (Commission) is amending its regulations in accordance with section 311(d) of the Energy Policy Act of 2005 (EPAct 2005) to establish mandatory procedures requiring prospective applicants to begin the Commissions pre-filing review process at least six months prior to filing an application for authorization to site and construct a liquefied natural gas (LNG) terminal. Section 311(d) of EPAct 2005, enacted on August 8, 2005, directs the Commission to promulgate such regulations within 60 days after enactment of EPAct 2005. The regulations mandatory procedures are designed to encourage applicants for LNG terminal siting and construction authority to cooperate with state and local officials, as required by EPAct 2005. The regulations also make the pre-filing process mandatory for prospective applicants for authority to construct related jurisdictional pipeline and other natural gas facilities, as defined in the regulations. The regulations also require a prospective applicant to comply with the pre-filing procedures prior to filing an application to make modifications to an existing or authorized LNG terminalDocket No. RM05-31-000-- 2--if such modifications involve significant state and local safety considerations that have

Richard Hoffmann; John Leiss; Whit Holden

2005-01-01T23:59:59.000Z

45

Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Federal Register 8 Federal Register / Vol. 75, No. 9 / Thursday, January 14, 2010 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER10-507-000] ERA MA, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization January 7, 2010. This is a supplemental notice in the above-referenced proceeding of ERA MA, LLC's application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR Part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426,

46

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ocean Renewable Power Company Maine, LLC Project No. 12711-005 Ocean Renewable Power Company Maine, LLC Project No. 12711-005 NOTICE OF AVAILABILITY OF ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED COBSCOOK BAY TIDAL ENERGY PROJECT (January 4, 2012) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Ocean Renewable Power Company, LLC's application for an 8-year pilot license for the proposed Cobscook Bay Tidal Energy Project (FERC Project No. 12711-005), which would be located in Cobscook Bay in Washington County, Maine, and has prepared an environmental assessment (EA) in cooperation with the U.S. Department of Energy

47

Nuclear Regulatory Commission issuances, May 1993. Volume 37, No. 5  

SciTech Connect

This report contains the issuances received during the specified period (May 1993) from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not deemed a part of these opinions or have any independent legal significance. Contents of this document include an Issuance of the Nuclear Regulatory Commission with respect to the Sacramento Municipal Utility District and Issuances of Directors` Decisions concerning the Interstate Nuclear Service Corporation; Niagara Mohawk Power Corporation; and Texas Utilities Electric Company, et al. and All Nuclear Power Plants with Thermo-Lag Fire Barriers.

Not Available

1993-05-01T23:59:59.000Z

48

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cameron LNG, LLC and Cameron LNG, LLC and Docket Nos. CP13-25-000 Cameron Interstate, LLC CP13-27-000 NOTICE OF AVAILABILITY OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED CAMERON LIQUEFACTION PROJECT (January 10, 2014) The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a draft environmental impact statement (EIS) for the Cameron Liquefaction Project (Project), proposed by Cameron LNG, LLC and Cameron Interstate Pipeline, LLC (collectively Cameron) in the above-referenced docket. Cameron requests authorization to export 12 million tons of liquefied natural gas (LNG) per year from its terminal in Cameron and Calcasieu Parishes, Louisiana. The draft EIS assesses the potential environmental effects of the construction and

49

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reedsport OPT Wave Park, LLC Project No. 12713-002 Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon NOTICE OF AVAILABILITY OF ENVIRONMENTAL ASSESSMENT (December 3, 2010) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Reedsport OPT Wave Park, LLC's application for license for the Reedsport OPT Wave Park Project (FERC Project No. 12713-002), which would be located in Oregon State territorial waters about 2.5 nautical miles off the coast near Reedsport, in Douglas County, Oregon. Staff prepared an environmental assessment (EA), which analyzes the potential environmental effects of licensing the project and concludes that licensing the project,

50

Nuclear Regulatory Commission's Integrated Strategy for Spent Fuel Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NRC's NRC's Integrated Strategy for NRC s Integrated Strategy for Spent Fuel Management Earl Easton 1 U.S. Nuclear Regulatory Commission May 25, 2010 Road to Yucca Mountain * 20+ years of preparation for the licensing i review * DOE application received in June 2008 and accepted for review in September 2008 * President Obama pursues alternatives to Yucca Mountain * DOE motion to withdraw in March 2010 2 * DOE motion to withdraw in March 2010 * Blue Ribbon Commission on America's Nuclear Future 2 Growing Spent Fuel Inventory Cumulative Used Nuclear Fuel Scenarios 50,000 100,000 150,000 200,000 250,000 Metric Tons 3 - 50,000 2010 2015 2020 2025 2030 2035 2040 2045 2050 Year Reference: Crozat, March 2010 Integrated Strategy * In response to the evolving national debate on spent fuel management strategy, NRC initiated a number of actions:

51

The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2012, OAS-L-13-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 OAS-L-13-01 November 2012 Department of Energy Washington, DC 20585 November 7, 2012 MEMORANDUM FOR THE EXECUTIVE DIRECTOR, FEDERAL ENERGY REGULATORY COMMISSION FROM: Daniel M. Weeber Assistant Inspector General for Audits and Administration Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2012" BACKGROUND The Federal Energy Regulatory Commission (Commission) is an independent agency within the Department of Energy responsible for, among other things, regulating interstate transmission of the Nation's electricity, natural gas and oil. In addition, the Commission licenses and inspects private, municipal and state hydroelectric projects. To achieve its mission, the Commission relies

52

Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory Commission  

Office of Legacy Management (LM)

111989 111989 Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia. Pennsylvania 19406 Dear Mr. Kinneman: -;' .-. 'W Enclosed are the copfes of the final ORNL survey reports on the radiologlcal Surveys conducted on three Teterboro, New Jersey properties; Metpath Incorporated, Allied Aerospace Corporatio; and Sumftomo Machinery Corporation. Copies of these reports have &en sent directly to the owners by our survey contractor Oak Ridge National Laboratory. If you have any questions regardfng these reports. please call me at (301) 353-5439. Sfncerely, Enclosure : < I j i Andrew Wallo III, Designation and Certffication Manager Dfvisfon 01 Facility and Site Oeconanlssionfng Projects

53

The Federal Energy Regulatory Commission's Unclassified Cyber Security Program … 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Evaluation Report Evaluation Report The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2013 OAS-M-14-01 October 2013 Department of Energy Washington, DC 20585 October 23, 2013 MEMORANDUM FOR THE EXECUTIVE DIRECTOR, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2013" BACKGROUND The Federal Energy Regulatory Commission (Commission) is an independent agency within the Department of Energy (Department) responsible for, among other things, regulating the interstate

54

KWOC (Key-Word-Out-of-Context) Index of US Nuclear Regulatory Commission Regulatory Guide Series  

SciTech Connect

To meet the objectives of the program funded by the Department of Energy (DOE)-Nuclear Energy (NE) Technology Support Programs, the Performance Assurance Project Office (PAPO) administers a Performance Assurance Information Program that collects, compiles, and distributes program-related information, reports, and publications for the benefit of the DOE-NE program participants. THE KWOC Index of US Nuclear Regulatory Commission Regulatory Guide Series'' is prepared as an aid in searching for specific topics in the US Nuclear Regulatory Commission, Regulatory Guide Series.

Jennings, S.D.

1990-04-01T23:59:59.000Z

55

California Energy Commission DRAFT COMMISSION REPORT  

E-Print Network (OSTI)

Via E-Filing RE: Klamath Hydroelectric Project (FERC Project No. 2082). California Energy Commission COMMISSION 1516 NINTH STREET SACRAMENTO, CA 95814-5512 www.energy.ca.gov April 19, 2007 Ms. Philis Posey Acting Secretary Federal Energy Regulatory Commission 888 First Street NE ­ Room 1A Washington, DC 20246

56

The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2011, OAS-M-12-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 OAS-M-12-01 November 2011 Department of Energy Washington, DC 20585 November 15, 2011 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2011" INTRODUCTION AND OBJECTIVE The Federal Energy Regulatory Commission (Commission) is an independent agency within the Department of Energy responsible for regulating the Nation's oil pipeline, natural gas, hydroelectric and wholesale electric industries. The Commission relies on a wide range of information technology (IT) resources in achieving its mission of assisting consumers in

57

CALIFORNIA COMMISSION  

E-Print Network (OSTI)

aspects of energy industry supply, production, transportation, delivery and distribution, demand CALIFORNIA ENERGY COMMISSION SCENARIO-BASED ASSESSMENT OF RESOURCE PLANS PREDICATED Integrated Energy Policy Report #12;CALIFORNIA ENERGY COMMISSION Michael R. Jaske Principal Author Global

58

Nuclear Regulatory Commission issuances, April 1995. Volume 41, Number 4  

SciTech Connect

This book contains issuances of the Nuclear Regulatory Commission and of the Atomic Safety and Licensing Boards, and an issuance of the Director`s decision. The issuances concern a petition filed by Dr. James E Bauer seeking interlocutory Commission review of the Atomic Safety and Licensing Board`s order imposing several restrictions on Dr. Bauer; a denial of an Interveners` Petition for Review addressing the application of Babcock and Wilcox for a renewal of its Special Nuclear Materials License; granting a motion for a protective order, by Sequoyah Fuel Corporation and General Atomics, limiting the use of the protected information to those individuals participating in the litigation and for the purposes of the litigation only; granting a Petitioner`s petition for leave to intervene and request for a hearing concerning Georgia Institute of Technology (Georgia Tech Research Reactor) renewal of a facility license; and a denial of a petition filed by Mr. Ted Dougherty requesting a shutdown of the San Onofre Nuclear Generating Station based on concerns regarding the vulnerability of the plant to earthquakes and defensibility of the plant to a terrorist threat.

NONE

1995-04-01T23:59:59.000Z

59

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION  

NLE Websites -- All DOE Office Websites (Extended Search)

4 FERC ¶ 62,213 4 FERC ¶ 62,213 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION United States Department of Energy Docket No. EF13-5-000 Western Area Power Administration Washoe Project, Stampede Division ORDER CONFIRMING AND APPROVING RATE SCHEDULE ON A FINAL BASIS ( September 5, 2013 ) Summary: On April 24, 2013, the Deputy Secretary of Energy (Deputy Secretary) filed a request for final confirmation and approval of Western Area Power Administration's (Western) Rate Schedule SNF-7, for a non-firm power formula rate applicable to the Washoe Project, Stampede Division (Washoe Project). 1 The Deputy Secretary placed the rates into effect on an interim basis effective August 1, 2013, 2 and requests final confirmation and approval of the rates for the period

60

Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18 Federal Register 18 Federal Register / Vol. 76, No. 83 / Friday, April 29, 2011 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14147-000] Storage Development Partners, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On April 1, 2011, Storage Development Partners, LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Camp Pendleton Project (project) to be located at Camp Pendleton Marine Corps Base, in San Diego County, California. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Energy Commission  

E-Print Network (OSTI)

This report was prepared as the result of work sponsored by the California Energy Commission. It does not necessarily represent the views of the Energy Commission, its employees or the State of California. The Energy Commission, the State of California, its employees, contractors and subcontractors make no warrant, express or implied, and assume no legal liability for the information in this report; nor does any party represent that the uses of this information will not infringe upon privately owned rights. This report has not been approved or disapproved by the California Energy Commission nor has the California Energy Commission passed upon the accuracy or adequacy of the information in this report. ii ACKNOWLEDGMENTS

Larry Waterland; M. Lorraine White; James J. Folkman; Ray Tuvell; Rosella Shapiro; B. B Blevins; Larry Waterl; Stefan Unnasch; Michael Jackson; M. Lorraine White; James M. Folkman; Sherry Stoner; Mckinley Addy; Asish Gautam; Tom Macdonald; Mike Mccormack; Tim Olson; Peter Quinliven

2006-01-01T23:59:59.000Z

62

Nuclear Regulatory Commission issuances, December 1993. Volume 38, No. 6  

Science Conference Proceedings (OSTI)

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

Not Available

1993-12-31T23:59:59.000Z

63

Nuclear Regulatory Commission issuances, February 1996: Volume 43, No. 2  

SciTech Connect

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

NONE

1996-02-01T23:59:59.000Z

64

Nuclear Regulatory Commission issuances, April 1994. Volume 39, No. 4  

SciTech Connect

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

Not Available

1994-04-01T23:59:59.000Z

65

Nuclear Regulatory Commission issuances, March 1995. Volume 41, No. 3  

SciTech Connect

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

1995-06-01T23:59:59.000Z

66

Nuclear Regulatory Commission issuances. Volume 42, No. 4  

SciTech Connect

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

NONE

1995-10-01T23:59:59.000Z

67

Nuclear Regulatory Commission issuances. Volume 43, No. 1, January 1996  

Science Conference Proceedings (OSTI)

This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

NONE

1996-03-01T23:59:59.000Z

68

Nuclear Regulatory Commission issuances. Volume 47, Number 3  

SciTech Connect

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The two issuances included here are: (1) the Commission issuance to the US Enrichment Corporation and (2) the Director`s Decision to the North Atlantic Energy Service Corporation.

NONE

1998-03-01T23:59:59.000Z

69

US Nuclear Regulatory Commission Input to DOE Request for Information Smart  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

US Nuclear Regulatory Commission Input to DOE Request for US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input. Comments relevant to the following two sections of the RFI: "Long Term Issues: Managing a Grid with High Penetration of New Technologies" and "Reliability and Cyber-Security," US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input More Documents & Publications Comments of DRSG to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges Reply Comments of Entergy Services, Inc. Progress Energy draft regarding Smart Grid RFI: Addressing Policy and

70

Indexes to Nuclear Regulatory Commission issuances, January--March 1996  

SciTech Connect

This publication is the 1st quarter 1996 index to issuances by the US NRC. These include issuances by the Commission, the Atomic Safety and Licensing Board Panel, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking.

NONE

1996-07-01T23:59:59.000Z

71

Nuclear Regulatory Commission issuances: June 1995. Volume 41, Number 6  

Science Conference Proceedings (OSTI)

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decision on Petitions for Rulemaking (DPRM). This report contains four issuances by the CLI, 5 issuances by the LBP, and 1 issuance by the DD.

NONE

1995-06-01T23:59:59.000Z

72

Nuclear Regulatory Commission issuances, Volume 45, No. 5  

SciTech Connect

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

NONE

1997-05-01T23:59:59.000Z

73

Nuclear Regulatory Commission issuances. Volume 46, Number 1  

SciTech Connect

This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

NONE

1997-07-01T23:59:59.000Z

74

Report to Congress:Impacts of the Federal Energy Regulatory Commission's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report to Congress:Impacts of the Federal Energy Regulatory Report to Congress:Impacts of the Federal Energy Regulatory Commission's Proposal for Standard Market Design Report to Congress:Impacts of the Federal Energy Regulatory Commission's Proposal for Standard Market Design A report on an independent study to assess various potential impacts of the proposed rulemaking by the Federal Energy Regulatory Commission (FERC), "Remedying Undue Discrimination through Open Access Transmission Service and Standard Electricity Market Design." Report to Congress:Impacts of the Federal Energy Regulatory Commission's Proposal for Standard Market Design More Documents & Publications Electric System Decision Making in Other Regions: A Preliminary Analysis Prepared for Western Interstate Energy Board Committee on Regional Electric

75

CALIFORNIA COMMISSION  

E-Print Network (OSTI)

with California's coastal power plant fleet; 3) biological resource issues associated with solar thermal.......................................................................23 CHAPTER 3: Cooling Water Use at New Power Plants Subject to Energy Commission Jurisdiction Cooling Water Trends for California Power Plants

76

Nuclear Regulatory Commission Issuances. Volume 45, No. 3  

Science Conference Proceedings (OSTI)

This report includes the issuances received in March 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. 10 issuances were received: Louisiana Energy Services (2 issuances); Illinois Power Company and Soyland Power Cooperative; Ralph. L. Tetrick; University of Cincinnati; Consumers Power Company; Entergy Operations, Inc.; Georgia Power Company; Westinghouse Electric Corporation; and Wisconsin Electric Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

NONE

1997-03-01T23:59:59.000Z

77

Guidelines for residential commissioning  

E-Print Network (OSTI)

Potential Benefits of Commissioning California Homes.Delp. 2000. Residential Commissioning: A Review of Relatedfor Evaluating Residential Commissioning Metrics Lawrence

Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

2003-01-01T23:59:59.000Z

78

California Energy Commission COMMISSION REPORT  

E-Print Network (OSTI)

for energy and annual peak load will be met by specific supply resources. Keywords: Electricity resource. California Energy Commission. Electricity Supply Analysis Division. CEC2002010009CMF. #12;ii #12;iii) ................................................................ 20 Supply Form S2: Energy Balance Table

79

California Energy Commission FINAL COMMISSION REPORT  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLES PORTFOLIO STANDARD ELIGIBILITY Sixth Edition Commission Guidebook CALIFORNIA ENERGY COMMISSION Edmund G. Brown Jr., Governor AUGUST 2012 CEC3002012006CMF #12;CALIFORNIA ENERGY COMMISSION ROBERT B. WEISENMILLER, PH.D. Chairman Commissioners KAREN J. DOUGLAS, J

80

The Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit, OAS-FS-13-03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Energy Regulatory Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit OAS-FS-13-03 November 2012 Department of Energy Washington, DC 20585 November 15, 2012 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Federal Energy Regulatory Commission's Fiscal Year 2012 Financial Statement Audit The attached report presents the results of the independent certified public accountants' audit of the Federal Energy Regulatory Commission's (Commission) balance sheets as of September 30, 2012 and 2011, and the related statements of net costs, changes in net position, budgetary

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Nuclear Regulatory Commission issuances, June 1996. Volume 43, Number 6  

Science Conference Proceedings (OSTI)

This report covers the issuances received during the specified period form the Commission, the Atomic Safety and licensing Boards, the administrative Law Judges, the Director`s decisions and the Decisions on Petitions for Rulemaking. Included are a memorandum and order on the decommissioning plan for Yankee Nuclear Power Station, a memorandum and order suspending byproduct material license for Eastern Testing and Inspection, Inc., an initial decision of the source materials license for Sequoyah Fuels Corporation, Director`s decisions for Palo Verde Nuclear Generating Station, Indian Point, Peach Bottom Atomic Power Station, Trojan Nuclear Plant, Rancho Seco Nuclear Generating Station, San Onofre Nuclear Generating Station, and Yankee Nuclear Power Station.

NONE

1996-06-01T23:59:59.000Z

82

Nuclear Regulatory Commission Issuances, Volume 44, No. 5  

Science Conference Proceedings (OSTI)

This report includes the issuances received in November 1996. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. Seven issuances were received and are abstracted individually in the database: Emerick S. McDaniel, U.S. Enrichment Corporation, Sequoyah Fuels Corporation and General Atomics, all power reactor licensees, Florida Power and Light Company, Maine Yankee Atomic Power Company, and Northern States Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

NONE

1996-11-01T23:59:59.000Z

83

Nuclear Regulatory Commission issuances, Volume 44, No. 4  

SciTech Connect

This report includes the issuances received in October 1996. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. 15 issuances were received and are abstracted individually in the database: Louisiana Energy Services, U.S. Enrichment Corporation, Yankee Atomic Electric Company, General Public Utilities Nuclear Corporation, James L. Shelton, Juan Guzman, Northern States Power Company, TESTCO Inc., Washington Public Power Supply System, all nuclear plants, Cleveland Electric Illuminating Company, Duke Power Company, Florida Power Corporation, and Northeast Nuclear Energy Company (2 issuances). No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

NONE

1996-10-01T23:59:59.000Z

84

Nuclear Regulatory Commission Issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders: July 1, 1992--December 31, 1992, Volume 36, Pages 1--396  

SciTech Connect

This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967.

Not Available

1992-12-31T23:59:59.000Z

85

Nuclear Regulatory Commission issuances: Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1--December 31, 1996. Volume 44, Pages 1--432  

SciTech Connect

The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. Issuances are referred to as follows: Commission--CLI, Atomic Safety and Licensing Boards--LBP, Administrative Law Judges--ALJ, Directors` Decisions--DD, and Decisions on Petitions for Rulemaking--DPRM.

1997-10-01T23:59:59.000Z

86

The U.S. Department of Energy and the Federal Energy Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy and the Federal Energy Regulatory U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a required "Implementation Proposal for The National Action Plan on Demand Response." The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a required "Implementation Proposal for The National Action Plan on Demand Response." August 1, 2011 - 1:59pm Addthis The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a required "Implementation Proposal for The National Action Plan on Demand Response." Addthis Related Articles Implementation Proposal for The National Action Plan on Demand Response DOE and FERC Joint Public Statement on Back Stop Siting

87

Federal Energy Regulatory Commission financial statements, September 30, 1995 and 1994  

SciTech Connect

The attached report presents the results of the independent certified public accountant`s audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1995 and 1994. The auditors have expressed an unqualified opinion on the 1995 statements. Their reports on FERC`s internal control structure and on compliance with laws and regulations, and management letter are also provided.

NONE

1996-02-12T23:59:59.000Z

88

European Commission  

NLE Websites -- All DOE Office Websites (Extended Search)

European Commission European Commission Directorate-General for Energy & Transport Ministry of Industry an Energy of the State of Qatar Gulf Co-operation Council Secretariat General EU-GCC Seminar: "Natural Gas Technologies - Realities & Prospects" Doha, Qatar, 7-8 February 2005 STREAM B: "Advanced Technologies for Power Generation through Natural Gas & Desalination" SESSION B.3: STATE OF THE ART OF COMBINED CYCLE PLANT Michael VOLLMER, Head of Combined Cycle Power Plant Development, ALSTOM Power Turbo-Systems February 2005 February 2005 Power Turbo-Systems State Of The Art Combined Cycle Power Plants Michael Vollmer 2 ALSTOM (Switzerland)Ltd© 2005. Preliminary/for discussion purposes only. We reserve all rights in this document and in the information

89

AGENCY: Federal Energy Regulatory Commission. ACTION: Order Granting Clarification  

E-Print Network (OSTI)

SUMMARY: In this Order Granting Clarification, the Commission addresses pending requests to clarify Form No. 552, under which natural gas market participants must annually report information regarding physical natural gas transactions that use an index or that contribute to or may contribute to the formation of a gas index. Order No. 704 required market participants to file these reports in order to provide greater transparency concerning the use of indices to price natural gas and how well index prices reflect market forces. Order No. 704-C revises Form No. 552 so as to (1) exempt from reporting any unexercised options to take gas under a take-or-release contract; (2) clarify the definition of exempt unprocessed natural gas transactions as those involving gas that is both not yet processed (to separate and recover natural gas liquids), and still upstream of a processing facility; (3) exempt from reporting cash-out and imbalance transactions, since they were burdensome to report and provided little market information; (4) strike the forms references to the blanket sales certificates issued under 284.402 or 284.284, sinceDocket No. RM07-10-002- 2-they were burdensome to report and provided little market information, so as to also

unknown authors

2010-01-01T23:59:59.000Z

90

EVALUATING INTERNAL STAKEHOLDER PERSPECTIVES ON RISK-INFORMED REGULATORY PRACTICES FOR THE NUCLEAR REGULATORY COMMISSION  

SciTech Connect

The U.S. Nuclear Regulatory Commission's (NRC) Office of Nuclear Reactor Regulation has begun a program to create a risk-informed environment within the reactor program. The first step of the process is to evaluate the existing environment and internal NRC stakeholder perceptions of risk-informed regulatory practices. This paper reports on the results of the first phase of this evaluation: assessing the current environment, including the level of acceptance of risk-informed approaches throughout the reactor program, the level of integration, areas of success, and areas of difficulty. The other two phases of the evaluation will identify barriers to the integration of risk into NRC activities and gather input on how to move to a risk-informed environment.

Peterson, L.K.; Wight, E.H.; Caruso, M.A.

2003-02-27T23:59:59.000Z

91

U.S. Nuclear Regulatory Commission Certifies HalfPACT Transportation Container  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Nuclear Regulatory Commission Certifies U.S. Nuclear Regulatory Commission Certifies HalfPACT Transportation Container CARLSBAD, N.M., November 20, 2000 - The U.S. Nuclear Regulatory Commission (NRC) issued a Certificate of Compliance November 2 for the HalfPACT transportation container. The HalfPACT will be used to supplement the Transuranic Package Transporter Model 2 (TRUPACT-II) for transportation of waste to the Waste Isolation Pilot Plant. The TRUPACT-II is currently used for transportation of waste to the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP). The new container is approximately 30 inches shorter than the TRUPACT-II. The HalfPACT is designed to carry seven 55-gallon drums weighing up to 1,000 pounds each, but is also capable of carrying one standard waste box or four 85-gallon drums.

92

File:Federal Hydropower - Federal Energy Regulatory Commission.pdf | Open  

Open Energy Info (EERE)

Federal Hydropower - Federal Energy Regulatory Commission.pdf Federal Hydropower - Federal Energy Regulatory Commission.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - Federal Energy Regulatory Commission.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 740 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:32, 22 May 2013 Thumbnail for version as of 15:32, 22 May 2013 1,275 × 1,650, 2 pages (740 KB) Graham7781 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup

93

SPEAR3 | Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

list (updated 060605) Power supply list Linear Optics from Closed Orbits (LOCO) Commissioning Schedule Commissioning Program(.ppt) Commissioning Schedule(.mpp) Run Schedule...

94

The SNS RFQ Commissioning  

E-Print Network (OSTI)

THE SNS RFQ COMMISSIONING * A. Ratti, J. Ayers, L.on a support structure, and commissioning of the RFQ. Theabout 1.0 dB. BEAM COMMISSIONING RESULTS Beam commissioning

2002-01-01T23:59:59.000Z

95

Nuclear Regulatory Commission issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1994--December 31, 1994. Volume 40, Pages 1--387  

SciTech Connect

The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. This book covers the following: issuances of the NRC; issuances of the Atomic Safety and Licensing Boards; and issuances of Directors` decisions.

NONE

1994-12-31T23:59:59.000Z

96

The Federal Energy Regulatory Commission's Fiscal Year 2011 Financial Statement Audit, OAS-FS-12-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Financial Statement Audit OAS-FS-12-01 November 2011 Department of Energy Washington, DC 20585 November 15, 2011 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Federal Energy Regulatory Commission's Fiscal Year 2011 Financial Statement Audit The attached report presents the results of the independent certified public accountants' audit of the Federal Energy Regulatory Commission (Commission) Fiscal Year 2011 balance sheet and the related statements of net cost, changes in net position, budgetary resources, and custodial activity.

97

Audit of the Federal Energy Regulatory Commission Leased Warehouse Space, CR-B-96-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIT OF THE FEDERAL ENERGY REGULATORY COMMISSION LEASED WAREHOUSE SPACE The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet 5 to 7 days after publication at the following alternative addresses:

98

Regulatory Impact Review Implementation of Inter-American Tropical Tuna Commission Resolutions Adopted in  

E-Print Network (OSTI)

Regulatory Impact Review Implementation of Inter-American Tropical Tuna Commission Resolutions to implement the decisions of the IATTC. The Tuna Conventions Act (16 U.S.C. 951-961) authorizes the Secretary the Resolution on Tuna Conservation 2011-2013 (C-11-01), the Resolution Prohibiting Fishing on Data Buoys (C-11

99

Nuclear Regulatory Commission Issuances, Volume 42, No. 2  

Science Conference Proceedings (OSTI)

This report include the issuances received during the specificed period (August 1995) from the NRC, the Atomic Safety and Licensing Boards, the Administrative Law Judges, and the Decisions on Petitions for Rule Making. In these issuances, the following areas were addressed: (1) Emergency planning at the University of Missouri, (2) Transfer of operating license at Plant Vogtle, (3) Discriminatory action against a whistle-blower at Millstone Units 1 & 2, (4) Regulatory issues related to embittlement and cracking at Oyster Creek, and (5) Age-related deterioration of reactor internals components at Pilgrim.

NONE

1995-08-01T23:59:59.000Z

100

Commissioning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commissioning Commissioning Commissioning October 16, 2013 - 4:43pm Addthis Project Construction Commissioning Operations & Maintenance Commissioning renewable energy for new construction projects and major renovations requires special consideration in selecting the commissioning agent and team, developing the specifications, conducting the full commissioning process, and integrating measurement and verification (M&V) systems. Commissioning can reduce overall costs related to construction deficiencies and ensure more efficient building and systems operation. For new construction projects or major renovations with renewable energy systems, commissioning is critical to the ultimate goal of operating all building systems as safely, optimally, and efficiently as their designers intended.

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Technical Analysis of the Federal Energy Regulatory Commission Order on Smart Grid Interoperability Standards  

Science Conference Proceedings (OSTI)

As specified in the Energy Independence and Security Act of 2007, the National Institute of Standards and Technology (NIST) is required to post smart grid interoperability standards for consideration by the Federal Energy Regulatory Commission (FERC). FERC is to determine if there is sufficient consensus for the standards to be adopted. A FERC technical conference was held on January 31, 2011, to review the five families of standards that were posted by NIST, and following the technical conference, comme...

2011-10-26T23:59:59.000Z

102

River Basin Commissions (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation establishes river basin commissions, for the Kankakee, Maumee, St. Joseph, and Upper Wabash Rivers. The commissions facilitate and foster cooperative planning and coordinated...

103

Report to the Nuclear Regulatory Commission from the staff panel on the Commission's determination of an Extraordinary Nuclear Occurrence (ENO)  

SciTech Connect

The Panel finds that the first criterion, pertaining to whether the accident caused a discharge of radioactive material or levels of radiation offsite as defined in 10 CFR 140.84, has not been met. It further finds that there is presently insufficient information to support any definitive finding as to whether or not the second criterion, relating to damage to persons or property offsite as defined in 10 CFR 140.85, has been met. Since the Panel has not found that both criteria have been met, it recommends that the Commission determine that the accident at Three Mile Island did not constitute an extraordinary nuclear occurrence.

none,

1980-01-01T23:59:59.000Z

104

Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Carl Wharton; Kent Norris

2009-12-01T23:59:59.000Z

105

Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

Science Conference Proceedings (OSTI)

This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Carl Wharton; Kent Norris

2010-03-01T23:59:59.000Z

106

Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Carl Wharton

2009-10-01T23:59:59.000Z

107

Technical Analysis of the Federal Energy Regulatory Commission Technical Conference on Smart Grid Interoperability Standards and the Responses to Questions Asked by the Commission  

Science Conference Proceedings (OSTI)

As specified in the Energy Independence and Security Act of 2007, the National Institute of Standards and Technology (NIST) is required to post smart grid interoperability standards for consideration by the Federal Energy Regulatory Commission (FERC). FERC is to determine if there is sufficient consensus for the standards to be adopted. A FERC technical conference was held on January 31, 2011, to review the five families of standards that were posted by NIST. The FERC Commissioners posed questions to two...

2011-10-26T23:59:59.000Z

108

Transportation Security Rulemaking Activities at the U.S. Nuclear Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AT THE AT THE U.S. NUCLEAR REGULATORY COMMISSION R. Clyde Ragland, P.E. Office of Nuclear Security and Incident Response 2011 DOE National Transportation Stakeholders Forum May 11, 2011 2 NRC Focus Prior to September 11, 2001 * Historically, NRC Transportation Security Regulations Focused on Highest Risk Radioactive Material, consisted of Special Nuclear Material (SNM) and Spent Nuclear Fuel (SNF) NRC Actions Since September 11, 2001 * Domestically, reviewed materials transported by NRC licensees and re- evaluated security requirements considering: - applicable threats to shipments - material considerations - magnitude of adverse consequences * Internationally, participated in the development of the IAEA Code of Conduct on the Safety and Security of Radioactive

109

Licensing Assistance team U.S. Nuclear Regulatory Commission, Region 1  

E-Print Network (OSTI)

Division of Nuclear Materials Safety 09 / z-4 (p7- 317,7p-4) The enclosed application for Material License and one copy is being submitted for the purpose of obtaining a specific license from the United States Nuclear Regulatory Commission to obtain two cross belt analyzers. The analyzers would be utilized at the Appalachian Power Companys John E. Amos Plant in West Virginia. The Appalachian Power Company and the John E. Amos Plant are included in American Electric Power. If I can be of any further assistance please give me a call at my office telephone number

John E. Amos Plant; R. T. Carroll F; Cc Greg; Massey John; E. Amos Plant; Joe Beer; Corporate Radiation; Safety Officer Donald; C. Cook Plant

2007-01-01T23:59:59.000Z

110

The United States Nuclear Regulatory Commission and the United States Department Of Energy Public Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 The UNITED STATES 3 NUCLEAR REGULATORY COMMISSION and 4 the UNITED STATES 5 DEPARTMENT OF ENERGY 6 7 PUBLIC MEETING 8 9 DISCUSSION OF THE IMPLEMENTATION OF SECTION 3116 OF 10 THE NATIONAL DEFENSE AUTHORIZATION ACT 11 12 Commencing at 9:10 a.m., November 16, 2006 13 at the L'Enfant Plaza Hotel 14 480 L'Enfant Plaza, SW 15 Washington DC 20024 16 17 Public meeting organized by: 18 Advanced Technologies and Laboratories International, Inc. 19 20010 Century Boulevard, Suite 500 20 Germantown, Maryland 20874 21 (301) 972-4430 22 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 2 P R O C E E D I N G S MR. CAMERON: Good morning everyone. My name is Chip Cameron. I'm an assistant general counsel in the office of General Counsel at the Nuclear Regulatory Commission. And I would like to

111

Federal Energy Management Program: Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning to someone by E-mail Share Federal Energy Management Program: Commissioning on Facebook Tweet about Federal Energy Management Program: Commissioning on Twitter...

112

September 10, 2003, Board Public Meeting - Nuclear Regulatory Commission Approach to Oversight  

NLE Websites -- All DOE Office Websites (Extended Search)

4 25 63 carefully, also. In fact, I would like to put in the r e c o r d at this point a letter that the Board sent to Admiral Bowman complimenting him on those reports , because we find them very helpful. Thank you. Any other questions? DR. MANSFIELD: I second that: especially the radiological safety reports and environmental reports. CHAIFWAN CONWAY: Yes , very important , and we thank you. We thank you for your assistance here today . Thank you very much. Now we have the experienced representatives from the Nuclear Regulatory Commission, Ms. Cynthia Carpenter and Dr. Edwin Hackett. If you would each introduce yourselves for the record. MS. CARPENTER: Good morning. My name is Cynthia Carpenter. I'm the Deputy Director of the Division of Inspection Program Management from the

113

Preservation and Implementation of Decommissioning Lessons Learned in the United States Nuclear Regulatory Commission  

SciTech Connect

Over the past several years, the United States Nuclear Regulatory Commission (NRC) has actively worked to capture and preserve lessons learned from the decommissioning of nuclear facilities. More recently, NRC has involved industry groups, the Organization of Agreement States (OAS), and the Department of Energy (DOE) in the effort to develop approaches to capture, preserve and disseminate decommissioning lessons learned. This paper discusses the accomplishments of the working group, some lessons learned by the NRC in the recent past, and how NRC will incorporate these lessons learned into its regulatory framework. This should help ensure that the design and operation of current and future nuclear facilities will result in less environmental impact and more efficient decommissioning. In summary, the NRC will continue capturing today's experience in decommissioning so that future facilities can take advantage of lessons learned from today's decommissioning projects. NRC, both individually and collectively with industry groups, OAS, and DOE, is aggressively working on the preservation and implementation of decommissioning lessons learned. The joint effort has helped to ensure the lessons from the whole spectrum of decommissioning facilities (i.e., reactor, fuel cycle, and material facilities) are better understood, thus maximizing the amount of knowledge and best practices obtained from decommissioning activities. Anticipated regulatory activities at the NRC will make sure that the knowledge gained from today's decommissioning projects is preserved and implemented to benefit the nuclear facilities that will decommission in the future.

Rodriguez, Rafael L. [United States Nuclear Regulatory Commission, Office of Federal and State Materials and Environmental Management Programs, Washington, DC 20555 (United States)

2008-01-15T23:59:59.000Z

114

NIST Blue Ribbon Commission on Management and Safety  

Science Conference Proceedings (OSTI)

... the Nuclear Regulatory Commission; the ... response; Environmental safety; Environmental remediation; and Security for hazardous ...

2013-06-12T23:59:59.000Z

115

Retro-Commissioning (RCx)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Retro-Commissioning Retro-Commissioning (RCx) FUPWG Meeting 20 October, 2010 RCx In UESC Contracts  Put RCx in Delivery Orders  Clear Scope of Work  Specify kW per Ton on Completion  State the Current Condition of the Equipment  State the Expected Performance in the Delivery Orders and Get the Contractor to Agree Up-Front  Don't Hire a Contractor that has Never Done Commissioning  Hire a Commissioning Agent  This Can Be Expensive What We Do at SCE  We Commission Everything  We ReCommission Everything to Some Degree  San Bernardino Story Up Front  You must review and approve the construction scope, budget, and schedule including all RCx activities BEFORE work begins at site  Use Pre-Established Guidelines (FEMP

116

OpenEI - Commission  

Open Energy Info (EERE)

http:en.openei.orgdatasetstaxonomyterm4360 en Alaska Oil and Gas Conservation Commission: February 2011 Drilling & Permit Records http:en.openei.orgdatasetsnode471...

117

Independent Verification and Validation Of SAPHIRE 8 Risk Management Project Number: N6423 U.S. Nuclear Regulatory Commission  

Science Conference Proceedings (OSTI)

This report provides an evaluation of the risk management. Risk management is intended to ensure a methodology for conducting risk management planning, identification, analysis, responses, and monitoring and control activities associated with the SAPHIRE project work, and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Kent Norris

2009-11-01T23:59:59.000Z

118

Commissioning Process | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Process Process Commissioning Process October 16, 2013 - 4:44pm Addthis The commissioning process is designed to verify that a renewable energy project meets specified agency design, performance, and operational requirements. To ensure that the level and focus of commissioning efforts are appropriate to the scope and complexity of the project, the commissioning planning process should begin at the same time as the design phase of the project. Integrating Commissioning Into the Design Process Developing a Detailed Commissioning Plan Testing Systems and Providing Commissioning Reports Performing Enhanced Commissioning Delivering Final Documentation Integrating Commissioning Into the Design Process The commissioning agent should attend design team meetings, review the

119

South Fork Tolt River Hydroelectric Project : Adopted Portions of a 1987 Federal Energy Regulatory Commission`s Final Environmental Impact Statement.  

DOE Green Energy (OSTI)

The South Fork Tolt River Hydroelectric Project that world produce 6.55 average megawatts of firm energy per year and would be sited in the Snohomish River Basin, Washington, was evaluated by the Federal Energy Regulatory commission (FERC) along with six other proposed projects for environmental effects and economic feasibility Based on its economic analysis and environmental evaluation of the project, the FERC staff found that the South Fork Tolt River Project would be economically feasible and would result in insignificant Impacts if sedimentation issues could be resolved. Upon review, the BPA is adopting portions of the 1987 FERC FEIS that concern the South Fork Tolt River Hydroelectric Project and updating specific sections in an Attachment.

United States. Bonneville Power Administration.

1992-07-01T23:59:59.000Z

120

The LHCB Commissioning  

E-Print Network (OSTI)

The LHCb experiment is dedicated to precision measurements of CP violation and rare decays of B hadrons at the Large Hadron Collider (LHC) at CERN. The LHCb installation has been finished in spring 2008 and an intensive testing and commissioning of the system has been started. An overview and the results from our commissioning activities are described.

Stefano de Capua; for the LHCb collaboration

2009-04-28T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Commission | OpenEI  

Open Energy Info (EERE)

57 57 Varnish cache server Commission Dataset Summary Description This dataset contains oil and gas drilling and permit records for February 2011. State oil and gas boards and commissions make oil and gas data and information open to the public. To view the full range of data contained at the Alaska Oil and Gas Conservation Commission, visit http://doa.alaska.gov/ogc/ Source Alaska Oil and Gas Conservation Commission Date Released February 28th, 2011 (3 years ago) Date Updated Unknown Keywords Alaska Commission gas oil Well record Data application/vnd.ms-excel icon http://doa.alaska.gov/ogc/drilling/dindex.html (xls, 34.3 KiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Monthly Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

122

Commissioning for Federal Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Introduction Introduction Chapter 1 Chapter 1 Introduction Introduction B uilding commissioning has often been likened to commissioning of a ship, where the Owners thor- oughly verify and prove the func- tional performance of all parts - engines, compasses, sonar, radar, radio, generators, potable water systems, and so on - under all pos- sible conditions and as a condition of acceptance before placing the ship in service. And where the Owner checks the presence of sys- tem operating and procedures manuals and the availability of up- to-date navigation charts. And where the crew has been properly and thoroughly trained on the ship's systems' operations and emergency procedures. Commissioning is not new - ships and aircraft have been commissioned for years. Building commissioning has

123

Commissioning for Federal Facilities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Introduction Introduction Chapter 1 Chapter 1 Introduction Introduction B uilding commissioning has often been likened to commissioning of a ship, where the Owners thor- oughly verify and prove the func- tional performance of all parts - engines, compasses, sonar, radar, radio, generators, potable water systems, and so on - under all pos- sible conditions and as a condition of acceptance before placing the ship in service. And where the Owner checks the presence of sys- tem operating and procedures manuals and the availability of up- to-date navigation charts. And where the crew has been properly and thoroughly trained on the ship's systems' operations and emergency procedures. Commissioning is not new - ships and aircraft have been commissioned for years. Building commissioning has

124

Motor-operated valve reliability programs: Lessons learned to meet new NRC (Nuclear Regulatory Commission) requirements  

Science Conference Proceedings (OSTI)

In recent years, reliability problems have surfaced with power plant motor-operated valves (MOVs) that (a) fail to perform as designed, and/or (b) require excessive maintenance to perform their intended function. As a result, the US Nuclear Regulatory Commission (NRC) mandated certain testing and reporting requirements in inspection and enforcement bulletin 85-03 (85-03). The NRC's generic letter 89-10 (89-10) significantly expands these requirements, to include all safety-related and position-changeable MOVs. The MOV program experience at the Sacramento Municipal Utility District (SMUD) Rancho Seco plant is particularly valuable since the NRC, to a large extent, utilized this program as the prototype for 89-10's requirements. The MOV inspection, overhaul, and testing began in September 1986, with completion scheduled for December 1986. The paper discusses problems encountered, recovery plant, results of recovery planning, and lessons learned. Experience at Rancho Seco has shown that comprehensive valve programs incorporating appropriate design practices, preventive maintenance practices, and operational constraints can improve plant availability.

Anderson, M.W.; Fadel, D.P.; Fraser, P.J.

1990-06-01T23:59:59.000Z

125

U.S. Nuclear Regulatory Commission accountability report, fiscal year 1995. Volume 1  

SciTech Connect

The US Nuclear Regulatory Commission (NRC) is one of six Federal agencies participating in a pilot project to streamline financial management reporting. The goal of this pilot is to consolidate performance-related reporting into a single accountability report. The project, which is being carried out under the guidance of the Chief Financial Officers Council, was undertaken in accordance with the Government Management Reform Act (GMRA) of 1994. The GMRA permits the streamlining of financial management reports in consultation with the appropriate Congressional Committees through a liaison in the US Office of Management and Budget (OMB). The results of the pilot project will determine the method to be used for reporting financial management information for fiscal year (FY) 1996. This report consolidates the information previously reported in the following documents: (1) the NRC`s annual financial statement required by the Chief Financial Officers Act of 1990; (2) the Chairman`s annual report to the President and the Congress, required by the Federal Managers` Financial Integrity Act of 1982; (3) the Chairman`s semiannual report to the Congress on management decisions and final actions on Office of Inspector General audit recommendations, required by the Inspector General Act of 1978, as amended. This report also includes performance measures, as required by the Chief Financial Officers Act of 1990.

1996-05-01T23:59:59.000Z

126

Updates to the U.S. Nuclear Regulatory Commission's Consolidated NMSS Decommissioning Guidance  

Science Conference Proceedings (OSTI)

In September 2003, U.S. Nuclear Regulatory Commission (NRC) staff in the Office of Nuclear Material Safety and Safeguards (NMSS) consolidated and updated the policies and guidance of its decommissioning program in a three-volume NUREG report, NUREG-1757, 'Consolidated NMSS Decommissioning Guidance' [1,2,3]. This NUREG report provides guidance on: planning and implementing license termination under the NRC's License Termination Rule (LTR), in 10 CFR Part 20, Subpart E; complying with the radiological criteria for license termination; and complying with the requirements for financial assurance and record-keeping for decommissioning and timeliness in decommissioning of materials facilities. The staff plans to periodically update NUREG-1757, so that it reflects current NRC decommissioning policy. In September 2005, the staff issued, for public comment, draft Supplement 1 to NUREG-1757 [4], which contains proposed updates to the three volumes of NUREG-1757. Draft Supplement 1 includes new and revised decommissioning guidance that addresses some of the LTR implementation issues, which were analyzed by the staff in two Commission papers (SECY-03-0069, Results of the LTR Analysis [5]; and SECY-04-0035, Results of the LTR Analysis of the Use of Intentional Mixing of Contaminated Soil [6]). These issues include restricted use and institutional controls, onsite disposal of radioactive materials under 10 CFR 20.2002, selection and justification of exposure scenarios based on reasonably foreseeable future land use (realistic scenarios), intentional mixing of contaminated soil, and removal of material after license termination (a follow-up to the LTR Analysis issue on the relationship between the LTR and the current case-by-case approach for release of solid materials). The staff also developed new and revised guidance on other issues, including the risk-informed graded approach for engineered barriers. This paper is a follow-up to a poster session and paper at Waste Management 2004, which presented the new Consolidated NMSS Decommissioning Guidance in NUREG-1757. This paper discusses the issues addressed in the current update to NRC's decommissioning guidance and explores the relationships between the issues. (authors)

Banovac, K.L.; Johnson, R.L.; Schmidt, D.W. [U.S. Nuclear Regulatory Commission, Washington, DC 20555 (United States)

2006-07-01T23:59:59.000Z

127

Automated Demand Response and Commissioning  

E-Print Network (OSTI)

Conference on Building Commissioning: May 4-6, 2005 Motegi,National Conference on Building Commissioning: May 4-6, 2005Demand Response and Commissioning Mary Ann Piette, David S.

Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Bourassa, Norman

2005-01-01T23:59:59.000Z

128

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

California Energy Commission STAFF REPORT SUMMER 2010 ELECTRICITY SUPPLY AND DEMAND OUTLOOK MAY Supply and Demand Outlook provides a summary of the California Energy Commission staff assessment. Summer 2010 Electricity Supply and Demand Outlook. California Energy Commission, Electricity Supply

129

The California Sentencing Commission  

E-Print Network (OSTI)

The California Sentencing Commission: Laying the Groundwork Sponsored by The Stanford Executive alexander, Executive Vice President, California Correctional and Peace Officers Association Laura appleman Project, The Pew Charitable Trusts Joyce Hayhoe, Assistant Secretary, Office of Legislation, California

Ford, James

130

Codex Alimentarius Commission update  

Science Conference Proceedings (OSTI)

AOCS Technical Director Richard Cantrill attended recent meetings of two Codex Alimentarius Commission (Codex) committees that deal with issues of interest to the fats and oils industry. Topics discussed included work to update the standard on named vegeta

131

The SNS RFQ Commissioning  

E-Print Network (OSTI)

THE SNS RFQ COMMISSIONING * A. Ratti, J. Ayers, L.Spallation Neutron Source (SNS ** ) project a 402.5 MHz RFQR. Keller et al, Status of the SNS Font End Systems, Proc.

2002-01-01T23:59:59.000Z

132

Chapter 9: Commissioning the Building  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: : Commissioning the Building Commissioning Process Overview Commissioning Activities and Documentation LANL | Chapter 9 Commissioning the Building Commissioning Process Overview Commissioning is a process - a systematic process of ensuring that a building performs in accordance with the design intent, contract documents, and the owner's operational needs. Commissioning is fundamental to the success of the whole-building design process. Due to the sophistication of building designs and the com- plexity of building systems constructed today, commis- sioning is necessary, but not automatically included as part of the typical design and contracting process. Commissioning is critical for ensuring that the building design is successfully constructed and operated.

133

Automated Demand Response and Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

and Commissioning Title Automated Demand Response and Commissioning Publication Type Conference Paper LBNL Report Number LBNL-57384 Year of Publication 2005 Authors Piette, Mary...

134

Federal Energy Management Program: Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

commissioning projects. Commissioning training is also available through FEMP. The on-demand training outlines processes to resolve operating problems, improve comfort,...

135

INITIAL COMMISSIONING OF NDCX-II  

E-Print Network (OSTI)

INITIAL COMMISSIONING OF NDCX-II* S. Lidia # , D. Arbelaez,the results of early commissioning studies that characterizeschematic and commissioning phases. The commissioning phases

Lidia, S.

2013-01-01T23:59:59.000Z

136

Indexes to Nuclear Regulatory Commission Issuances, July--December 1993. Volume 38, Index 2  

Science Conference Proceedings (OSTI)

Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Digests and Headers; Legal Citations Index; Subject Index, and Facility Index.

Not Available

1994-04-01T23:59:59.000Z

137

Commissioning Team | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commissioning Team Commissioning Team Commissioning Team October 16, 2013 - 4:45pm Addthis Assembling a committed team is a critical part of the commissioning process for renewable energy projects. Members of the team vary based on the size, complexity, and funding mechanism used for the project at hand. The commissioning team lead is a commissioning agent, an independent agent representing the agency's interests. In addition to the commissioning agent, participants in the commissioning process can include the agency, operations and management (O&M) personnel, contractors, subcontractors, and the architectural and engineering (A&E) firm. The project energy lead should also be an active member of the commissioning team and work closely with the commissioning agent. Renewable energy projects often require a team of experts in specific

138

ATF2 Commissioning  

Science Conference Proceedings (OSTI)

ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

Seryi, A.; /SLAC; Christian, G.; /KLTE-ATOMKI; Parker, B.; /BNL; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; /CERN; Wolski, A.; Elsen, E.; /Cockcroft Inst. /DESY; Sanuki, T.; /Tohoku U.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; /Fermilab; Takahashi, T.; /Hiroshima U.; Bai, S.; Gao, J.; /Beijing, Inst. High Energy Phys.; Bolzon, B.; Geffroy, N.; Jeremie, A.; /Annecy, LAPP; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

2009-10-30T23:59:59.000Z

139

Commissioning Guidance for ESPCs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7.2 7.2 Commissioning Guide Commissioning Guidance for ESPCs INTRODUCTION Federal facility managers are challenged daily with maintaining existing federal building stock that is energy inefficient, requires increasing operations and maintenance (O&M) expenses, and often does not achieve the building occupant comfort needed to maintain worker productivity. Additionally, they are faced with congressionally mandated requirements to reduce energy use and O&M expenses, with little capital funding. The Super ESPC program provides a procurement mechanism to allow agencies to acquire performance-based services to implement energy efficient equipment and systems that reduce energy use and O&M expenses through projects designed, installed, financed, and

140

ATLAS Muon Detector Commissioning  

E-Print Network (OSTI)

The ATLAS muon spectrometer consists of several major components: Monitored Drift Tubes (MDTs) for precision measurements in the bending plane of the muons, supplemented by Cathode Strip Chambers (CSC) in the high eta region; Resistive Plate Chambers (RPCs) and Thin Gap Chambers (TGCs) for trigger and second coordinate measurement in the barrel and endcap regions, respectively; an optical alignment system to track the relative positions of all chambers; and, finally, the world's largest air-core magnetic toroid system. We will describe the status and commissioning of the muon system with cosmic rays and plans for commissioning with early beams.

E. Diehl; for the ATLAS muon collaboration

2009-10-15T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Federal Energy Regulatory Commission Interconnection Queue Practices Technical Conference December 11, 2007  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Workshop December 8, 2011 Hilton St. Louis Airport, 10330 Natural Bridge Road, St. Louis, Missouri 63134 Presented by: Jerry Lein Public Utility Analyst North Dakota Public Service Commission Phone: 701 328-1035 Fax: 701 328-2410 jlein@nd.gov Overview * ND Electric Energy Resources * Need for New Transmission - Interconnection Difficulties - Transmission Constraints * Regional Transmission Projects Update * Capacity Deliverability between RTOs ND Electric Energy Resources * ND Ranked #1 in U.S. for Wind Energy Potential - 1991 Pacific Northwest Labs study found ND Wind could potentially supply 36% of U.S. electric energy consumption. -

142

COMMISSION GUIDEBOOK RENEWABLES PORTFOLIO  

E-Print Network (OSTI)

Commission's system for tracking and verifying compliance with the RPS. Keywords biodiesel, biogas, biomass of biomass or biogas fuels. In addition, Section 399.12, Subdivision (g)(3), specifies that no electricity that uses a mix of natural gas and biogas injected into a gas transportation pipeline. Once WREGIS

143

Indexes to Nuclear Regulatory Commission issuances, July--December 1996. Volume 44, Index 2  

SciTech Connect

Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decision on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by apellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (operating license, operating license amendment, etc.); type of issuance (memorandum, order, decision, etc.).

1997-04-01T23:59:59.000Z

144

New Forestry Commission District Office The new Forestry Commission  

E-Print Network (OSTI)

New Forestry Commission District Office The new Forestry Commission District office at Smithton in construction The Forestry Commission's District office at Smithton in Inverness, Scotland, covers the national fuel heating system has proved effective during the winter of 2009/10, one of the harshest in 40 years

145

Utah Labor Commission | Open Energy Information  

Open Energy Info (EERE)

Labor Commission Labor Commission Jump to: navigation, search Name Utah Labor Commission Address 160 East 300 South, 3rd Floor Place Salt Lake City, Utah Zip 84114-6600 Phone number (801) 530-6800 Website http://laborcommission.utah.go References Website[1] This article is a stub. You can help OpenEI by expanding it. Utah Labor Commission is an organization based in Salt Lake City, Utah. The Utah Labor Commission is the regulatory agency responsible for preserving the balance established by the legislature for protecting the health, safety, and economic well-being of employees and employers. It is a multi-division state agency directed by a Commissioner who is appointed by the Governor. The Commissioner oversees the various functions of the divisions within the Commission.

146

Commissioning : The Total Process  

E-Print Network (OSTI)

In recent years, most new buildings have been equipped with increasingly sophisticated heating, ventilating, and air-conditioning (HVAC) systems, energy conservation equipment, lighting systems, security systems, and environmental control devices that rely on electronic control. Very frequently these systems and design features have not performed as expected. This can result in energy-efficiency losses. occupant complaints about comfort, indoor air quality problems. high operating costs, and increased liability for building owners, operators, employers, and design professionals. Building commissioning was developed in response to these concerns. Commissioning involves the examining and testing of building systems to verify aspects of the building design, ensure that the building is constructed in accordance with the contract documents, and verify that the building and its systems function according to the design intent documents. The process helps to integrate and organize the design, construction, operations, and maintenance of a building's systems to produce a healthy, comfortable, and efficient facility.

Kettler, G. J.

1998-01-01T23:59:59.000Z

147

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM OVERALL PROGRAM GUIDEBOOK Fourth Edition Manager Renewable Energy Office G. William Pennington Acting Deputy Director Efficiency and Renewable of how the Energy Commission's Renewable Energy Program is administered and outlines terms

148

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

California Energy Commission STAFF REPORT SUMMER 2012 ELECTRICITY SUPPLY ABSTRACT The Summer 2012 Electricity Supply and Demand Outlook is the California Energy and Demand Outlook. California Energy Commission, Electricity Supply Analysis Division. CEC-200

149

The use of information systems to transform utilities and regulatory commissions: The application of geographic information systems  

SciTech Connect

One technology that can assist utilities remain financially viable in competitive markets and help utilities and regulators to better serve the public is information technology. Because geography is an important part of an electric, natural gas, telecommunications, or water utility, computer-based Geographic Information Systems (GIS) and related Automated Mapping/Facilities Management systems are emerging as core technologies for managing an ever-expanding variety of formerly manual or paper-based tasks. This report focuses on GIS as an example of the types of information systems that can be used by utilities and regulatory commissions. Chapter 2 provides general information about information systems and effects of information on organizations; Chapter 3 explores the conversion of an organization to an information-based one; Chapters 4 and 5 set out GIS as an example of the use of information technologies to transform the operations of utilities and commissions; Chapter 6 describes the use of GIS and other information systems for organizational reengineering efforts; and Chapter 7 examines the regulatory treatment of information systems.

Wirick, D.W.; Montgomery, G.E.; Wagman, D.C.; Spiers, J.

1995-09-01T23:59:59.000Z

150

A Guide to Building Commissioning  

SciTech Connect

Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

Baechler, Michael C.

2011-09-01T23:59:59.000Z

151

A Guide to Building Commissioning  

SciTech Connect

Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

Baechler, Michael C.

2011-09-01T23:59:59.000Z

152

TATE OF CALIFORNI ENERGY COMMISSION  

E-Print Network (OSTI)

of concentrator photovoltaic systems must provide acceptable evidence to the Energy Commission for each modelS TATE OF CALIFORNI A ENERGY COMMISSION Pete Wilson, Governor CALIFORNIA ENERGY COMMISSION January Charles Mizutani, Manager TECHNOLOGY EVALULATION OFFICE Nancy J. Deller, Deputy Director ENERGY TECHNOLOGY

153

Automated Continuous Commissioning of Commercial Buildings  

E-Print Network (OSTI)

Conference on Building Commissioning. San Francisco, CA. 17.Commercial Buildings Commissioning, LBNL- 56637, Nov. 2004.Automated Continuous Commissioning Tool GUI Screenshots from

Bailey, Trevor

2013-01-01T23:59:59.000Z

154

Commissioning of the ATLAS pixel detector  

E-Print Network (OSTI)

Commissioning of the ATLAS pixel detector Tobias GollingUniversity of California. Commissioning of the ATLAS pixelof the past and future commissioning activities of the ATLAS

Golling, Tobias; ATLAS Collaboration

2009-01-01T23:59:59.000Z

155

Installation and Commissioning Automated Demand Response Systems  

E-Print Network (OSTI)

al: Installation and Commissioning Automated Demand ResponseConference on Building Commissioning: April 22 24, 2008al: Installation and Commissioning Automated Demand Response

Kiliccote, Sila; Global Energy Partners; Pacific Gas and Electric Company

2008-01-01T23:59:59.000Z

156

Colorado Ground Water Commission | Open Energy Information  

Open Energy Info (EERE)

Water Commission Jump to: navigation, search Name Colorado Ground Water Commission Place Colorado Website http:water.state.co.usgroun References Colorado Ground Water Commission...

157

Commissioning Specifications | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Specifications Specifications Commissioning Specifications October 16, 2013 - 4:44pm Addthis Commissioning specifications outline basic requirements of the commissioning process and detail the roles and responsibilities of each party involved. System checklists, startup requirements, and performance testing procedures are typically included in the specifications to let contractors know what standards are required during the various testing phases involved throughout the commissioning process. Since renewable energy technologies are changing and developing rapidly, it is critical to have the commissioning specifications developed by a well-informed resource with up-to-date renewable energy expertise. This resource must also have a thorough understanding of how renewable energy

158

Commissioning Process | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commissioning Process Commissioning Process Commissioning Process October 7, 2013 - 9:19am Addthis The commissioning process for Federal facilities generally follows a four-step process. This process holds true across all forms of commissioning and for both new and existing buildings. Step 1: Planning The planning step includes developing and agreeing upon the overall commissioning objectives and strategies, assembling the project team, and compiling and perusing building and equipment documentation. Objectives for this step include: Optimizing building operations to reduce operating costs Addressing complaints from occupants regarding air quality or comforts Creating a model facility Improving facility operations and maintenance (O&M) and reducing emergency calls. When forming the commissioning team, considerations could include

159

Commissioning a materials research laboratory  

DOE Green Energy (OSTI)

This presentation covers the process of commissioning a new 150,000 sq. ft. research facility at Sandia National Laboratories. The laboratory being constructed is a showcase of modern design methods being built at a construction cost of less than $180 per sq. ft. This is possible in part because of the total commissioning activities that are being utilized for this project. The laboratory's unique approach to commissioning will be presented in this paper. The process will be followed through from the conceptual stage on into the actual construction portion of the laboratory. Lessons learned and cost effectiveness will be presented in a manner that will be usable for others making commissioning related decisions. Commissioning activities at every stage of the design will be presented along with the attributed benefits. Attendees will hear answers to the what, when, who, and why questions associated with commissioning of this exciting project.

SAVAGE,GERALD A.

2000-03-28T23:59:59.000Z

160

ATOMIC ENERGY COMMISSION  

Office of Legacy Management (LM)

' ' ATOMIC ENERGY COMMISSION Frank K. Pittman, Director, bivisioa of Waste &&gement and s- portation, Headquarters j CONTAMItUTED RX-AEC-OWNED OR LEASED FACILITIES' This memorandum responds to your TWX certain information on the above subject. the documentation necessary to answer your available due to the records disposal vailing at the time of release or From records that are available and from disc&ions with most familiar with the transfer operations, &have the current radiological conditibn of transferred property is adequate under present standards. The following tabulations follow the format suggested in your TWX and are grouped to an operations or contract r+ponsibility. A,I Ex-AEC Storage Sites - I r:/ National Stockpile Site '(NSS) and OperatEonal

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Commissioning Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Checkout, Testing, and Checkout, Testing, and Commissioning Plan Review Module March 2010 CD-0 O Ch 0 OFFICE OF heckout, T C CD-1 F ENVIRON Standard R Testing, a Revi Critical Decis CD-2 Ma NMENTAL Review Plan and Com iew Module sion (CD) Ap CD arch 2010 L MANAGE n (SRP) mmissioni e pplicability D-3 EMENT ing Plan CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

162

Commissioning ATLAS Trigger  

E-Print Network (OSTI)

The ATLAS experiment at the Large Hadron Collider (LHC) will face the challenge of efficiently selecting interesting candidate events in $pp$ collisions at 14 TeV centre-of-mass energy, whilst rejecting the enormous number of background events. Therefore it is equipped with a three level trigger system. The first level is is hardware based and uses coarse granularity calorimeter information and fast readout muon chambers. The second and third level triggers, which are software based, will need to reduce the first level trigger output rate of ~ 75 kHz to ~ 200 Hz written out to mass storage. The progress in commissioning of this system will be reviewed in this paper.

Tomasz Bold; for Atlas Tdaq

2008-10-20T23:59:59.000Z

163

Report to Congress:Impacts of the Federal Energy Regulatory Commission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

"Remedying Undue Discrimination through Open Access Transmission Service and Standard Electricity Market Design." Report to Congress:Impacts of the Federal Energy Regulatory...

164

ALL AGREEMENT STATES OPPORTUNITY TO PROVIDE INPUT ON THE U.S. NUCLEAR REGULATORY COMMISSIONS MANUAL CHAPTER FOR THE MATERIALS INSPECTION PROGRAM- INSPECTION MANUAL CHAPTER 2800 (FSME-10-013)  

E-Print Network (OSTI)

Purpose: To provide an opportunity for Agreement States to review and comment on recommended changes addressing the U.S. Nuclear Regulatory Commissions (NRC) materials inspection program. This is an opportunity to provide input * on Inspection Manual Chapter (IMC) 2800. Background: The last revision to Inspection Manual Chapter 2800 (IMC 2800) occurred in September 2005. Since that time, the NRC and Agreement States have implemented new security requirements. This revision provides inspection guidance in regards to some of the more urgent new security requirements, including changes from the Government Accountability Office action plan, as well as to update the previous version in regard to other, lower priority changes. This request supersedes letter RCPD-08-013 dated August 20, 2008, which requested a similar review of IMC 2800. This revision incorporates the comments received from Agreement States that responded to RCPD-08-013.

unknown authors

2010-01-01T23:59:59.000Z

165

PRELIMINARY Run Shutdown BL Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

PRELIMINARY Run Shutdown BL Commissioning Maintenance AP SPEAR Down Injector Startup University Holidays Spear Down SPEAR Startup MA Sep Oct 2011 2012 MA Mar Apr May Jun Jul...

166

Beamline Commissioning Readiness Review Team  

NLE Websites -- All DOE Office Websites (Extended Search)

Readiness Review Team (BCRRT) 1. Purpose The APS Beamline Commissioning Readiness Review Team (BCRRT) reports to and advises the AES Associate Division Director for Mechanical and...

167

Beamline Commissioning Readiness Review Team  

NLE Websites -- All DOE Office Websites (Extended Search)

AES AES CCSM & BCRRT Chair J. Vacca AES RSO-Health Physicist W. VanWingeren AES AES Commissioning Coordinator Floor Coordinator AES Beamline Operations Support Beamline Staff...

168

Government Performance and Results Act: Performance plan FY 1999, U.S. Nuclear Regulatory Commission. Volume 1  

SciTech Connect

The Nuclear Regulatory Commission`s (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency`s strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to help facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended.

Fuches, J.L.

1998-02-01T23:59:59.000Z

169

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM OVERALL PROGRAM GUIDEBOOK Fifth Edition Gonçalves Office Manager Renewable Energy Office Dave Ashuckian, P.E. Deputy Director Efficiency and Renewable Energy Division Robert P. Oglesby Executive Director The California Energy Commission formally

170

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM OVERALL PROGRAM GUIDEBOOK Sixth Edition Gonçalves Office Manager Renewable Energy Office Dave Ashuckian, P.E. Deputy Director Efficiency and Renewable Energy Division Robert P. Oglesby Executive Director The California Energy Commission formally

171

U. S. Nuclear Regulatory Commission budget estimates Fiscal Year 1978. Appropriations: salaries and expenses  

SciTech Connect

Budget estimates are presented for: nuclear reactor regulation (NRR); Standards development (SD); Inspection and enforcement (IandE); Nuclear material safety and safeguards (NMSS); Nuclear regulatory research (RES); Program technical support (PTS); and Program direction and administration (PDA); Special supporting tables are included.

1977-03-01T23:59:59.000Z

172

Public Service Commission and Natural Gas Safety Standards (Missouri)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation establishes the state Public Service Commission, which has regulatory authority over the electric, gas, water, and telecommunications utilities. Section 386.572 of this legislation...

173

Federal Energy Management Program: Commissioning Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning Commissioning Process to someone by E-mail Share Federal Energy Management Program: Commissioning Process on Facebook Tweet about Federal Energy Management Program: Commissioning Process on Twitter Bookmark Federal Energy Management Program: Commissioning Process on Google Bookmark Federal Energy Management Program: Commissioning Process on Delicious Rank Federal Energy Management Program: Commissioning Process on Digg Find More places to share Federal Energy Management Program: Commissioning Process on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Types Process Metering Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources Contacts Greenhouse Gases

174

Vital area identification for U.S. Nuclear Regulatory Commission nuclear power reactor licensees and new reactor applicants.  

SciTech Connect

U.S. Nuclear Regulatory Commission nuclear power plant licensees and new reactor applicants are required to provide protection of their plants against radiological sabotage, including the placement of vital equipment in vital areas. This document describes a systematic process for the identification of the minimum set of areas that must be designated as vital areas in order to ensure that all radiological sabotage scenarios are prevented. Vital area identification involves the use of logic models to systematically identify all of the malicious acts or combinations of malicious acts that could lead to radiological sabotage. The models available in the plant probabilistic risk assessment and other safety analyses provide a great deal of the information and basic model structure needed for the sabotage logic model. Once the sabotage logic model is developed, the events (or malicious acts) in the model are replaced with the areas in which the events can be accomplished. This sabotage area logic model is then analyzed to identify the target sets (combinations of areas the adversary must visit to cause radiological sabotage) and the candidate vital area sets (combinations of areas that must be protected against adversary access to prevent radiological sabotage). Any one of the candidate vital area sets can be selected for protection. Appropriate selection criteria will allow the licensee or new reactor applicant to minimize the impacts of vital area protection measures on plant safety, cost, operations, or other factors of concern.

Whitehead, Donnie Wayne; Varnado, G. Bruce

2008-09-01T23:59:59.000Z

175

U.S. Nuclear Regulatory Commission Extremely Low Probability of Rupture pilot study : xLPR framework model user's guide.  

Science Conference Proceedings (OSTI)

For the U.S. Nuclear Regulatory Commission (NRC) Extremely Low Probability of Rupture (xLPR) pilot study, Sandia National Laboratories (SNL) was tasked to develop and evaluate a probabilistic framework using a commercial software package for Version 1.0 of the xLPR Code. Version 1.0 of the xLPR code is focused assessing the probability of rupture due to primary water stress corrosion cracking in dissimilar metal welds in pressurizer surge nozzles. Future versions of this framework will expand the capabilities to other cracking mechanisms, and other piping systems for both pressurized water reactors and boiling water reactors. The goal of the pilot study project is to plan the xLPR framework transition from Version 1.0 to Version 2.0; hence the initial Version 1.0 framework and code development will be used to define the requirements for Version 2.0. The software documented in this report has been developed and tested solely for this purpose. This framework and demonstration problem will be used to evaluate the commercial software's capabilities and applicability for use in creating the final version of the xLPR framework. This report details the design, system requirements, and the steps necessary to use the commercial-code based xLPR framework developed by SNL.

Kalinich, Donald A.; Sallaberry, Cedric M.; Mattie, Patrick D.

2010-12-01T23:59:59.000Z

176

Executive Director for Operations OPTIONS FOR U.S. NUCLEAR REGULATORY COMMISSION INVOLVEMENT WITH THE NAVYS REMEDIATION OF THE  

E-Print Network (OSTI)

To obtain Commission approval on options for the U.S. Nuclear Regulatory Commissions (NRCs) involvement with the Navys remediation of the Hunters Point Naval Shipyard (HPS) site, and recommended actions to inform the U.S. Environmental Protection Agency (EPA), the Navy, and stakeholders about the Commissions decision regarding NRCs involvement. This paper does not address any new commitments. SUMMARY: In July 2007 the Navy requested that NRC clarify the potential for NRC involvement with the remediation of the HPS site in San Francisco, California. The Navy explained that resolving uncertainties about NRC jurisdiction and involvement is important because of the potential impact on the Navys ongoing remediation and expedited schedules needed to support the redevelopment plans of the City of San Francisco for the site. These redevelopment plans and schedules have high visibility and considerable support from elected Federal, State, and local officials. In response to the Navys request, the staff has evaluated three options for NRCs involvement at the HPS and related policy issues. The staff recommends the option of relying CONTACT:

R. W. Borchardt; Robert L. Johnson

2008-01-01T23:59:59.000Z

177

Embedded Commissioning for Building Design  

E-Print Network (OSTI)

Building Commissioning has a broad scope that extends to all phases of building delivery. We view commissioning as a building delivery embedded process that persistently verifies and validates design intent throughout the building lifecycle process. In the building lifecycle approach, buildings are considered to have cradle-to-grave life spans. They are modeled through a variety of different developmental phases. In this research project, we intend to build the necessary theory and tools to support the embedded commissioning process as a co-function of building lifecycle.

Akin, O.; Turkaslan-Bulbul, M. T.; Gursel, I.; Garrett, J. H.; Akinci, B.; Wang, H.

2004-01-01T23:59:59.000Z

178

Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1995--December 31, 1995. Volume 42, Pages 1-258  

Science Conference Proceedings (OSTI)

This is the 42nd volume of issuances of the U.S. Nuclear Regulatory Commission (NRC) and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. This book is a reprinting, containing corrections of numerous printing errors in a previously distributed book. It covers the period from July 1, 1995 to December 31, 1995. Atomic Safety and Licensing Boards conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities, and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a 6-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly editions and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition.

NONE

1996-11-01T23:59:59.000Z

179

California Energy Commission DRAFT STAFF REPORT  

E-Print Network (OSTI)

on eligibility of hydroelectric and fuel cell facilities, respectively). The Energy Commission recognizesCalifornia Energy Commission STAFF REPORT RENEWABLES PORTFOLIO STANDARD ELIGIBILITY Draft Staff Guidebook Fourth Edition AUGUST 2010 CEC3002010007SD #12;CALIFORNIA ENERGY COMMISSION Kate Zocchetti

180

u. S. Atomic Energy Commission  

Office of Legacy Management (LM)

October 31, 1949 Manager of Operations u. S. Atomic Energy Commission R. 0. Box 30, Ansonia Station New York ES, N. Y. MATERIALS 5+k& hJf Reference: SK:BL Attention: Mr. R. J....

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

California Energy Commission STAFF REPORT  

E-Print Network (OSTI)

: Solazyme, Incorporated, "Development of Pilot Production Plants for Soladiesel RD Utilizing) Renewable Diesel Solazyme, Inc. In Progress Non-Attainment (All) Source: Energy Commission staff analysis as a high percentage of sensitive populations. #12;2 Project Name Solazyme, Incorporated

182

Rivanna River Basin Commission (Virginia)  

Energy.gov (U.S. Department of Energy (DOE))

The Rivanna River Basin Commission is an independent local entity tasked with providing guidance for the stewardship and enhancement of the water quality and natural resources of the Rivanna River...

183

TATE OF CALIFORNI NERGY COMMISSION  

E-Print Network (OSTI)

and Wildlife), Blaine Parker (Columbia River Inter-Tribal Fish Commission) and Brad James (Washington and on sturgeon passage at Columbia River hydroelectric dams. The presentation will review progress

184

Commissioning of the HELIOS spectrometer.  

Science Conference Proceedings (OSTI)

This paper describes the implementation and commissioning of a device based on a new concept for measurements of nuclear reactions in inverse kinematics. The HELIcal Orbit Spectrometer, HELIOS, was commissioned at Argonne National Laboratory by studying the {sup 28}Si(d,p){sup 29}Si reaction in inverse kinematics. This experiment served as a proof of principle for this previously untested concept, and was used to verify the response and performance characteristics of HELIOS.

Lighthall, J. C.; Back, B. B.; Baker, S. I.; Freeman, S. J.; Lee, H. Y.; Kay, B. P.; Marley, S. T.; Rehm, K. E.; Rohrer, J. E.; Schiffer, J. P.; Shetty, D. V.; Vann, A. W.; Winkelbauer, J. R.; Wuosmaa, A. H.; Physics; Western Michigan Univ.; Univ. of Manchester

2010-01-01T23:59:59.000Z

185

Wisconsin SRF Electron Gun Commissioning  

SciTech Connect

The University of Wisconsin has completed fabrication and commissioning of a low frequency (199.6 MHz) superconducting electron gun based on a quarter wave resonator (QWR) cavity. Its concept was optimized to be the source for a CW free electron laser facility. The gun design includes active tuning and a high temperature superconducting solenoid. We will report on the status of the Wisconsin SRF electron gun program, including commissioning experience and first beam measurements.

Bisognano, Joseph J. [University of Wisconsin-Madison; Bissen, M. [University of Wisconsin-Madison; Bosch, R. [University of Wisconsin-Madison; Efremov, M. [University of Wisconsin-Madison; Eisert, D. [University of Wisconsin-Madison; Fisher, M. [University of Wisconsin-Madison; Green, M. [University of Wisconsin-Madison; Jacobs, K. [University of Wisconsin-Madison; Keil, R. [University of Wisconsin-Madison; Kleman, K. [University of Wisconsin-Madison; Rogers, G. [University of Wisconsin-Madison; Severson, M. [University of Wisconsin-Madison; Yavuz, D. D. [University of Wisconsin-Madison; Legg, Robert A. [JLAB; Bachimanchi, Ramakrishna [JLAB; Hovater, J. Curtis [JLAB; Plawski, Tomasz [JLAB; Powers, Thomas J. [JLAB

2013-12-01T23:59:59.000Z

186

Commissioning: A Highly Cost-Effective Building Energy Management Strategy  

E-Print Network (OSTI)

Commissioning: A Highly Cost-Effective Building Energypractice of building commissioning is a particularly potentefficiency. Although commissioning has earned increased

Mills, Evan

2012-01-01T23:59:59.000Z

187

Types of Commissioning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Types of Commissioning Types of Commissioning Types of Commissioning October 7, 2013 - 9:17am Addthis Several commissioning types exist to address the specific needs of equipment and systems across both new and existing buildings. The following commissioning types provide a good overview. New Building Commissioning New building commissioning happens during the design and construction of new facilities. The process ensures that systems and equipment in new buildings operate properly. This is done through design reviews, functional testing, system documentation, and operator training. Federal agencies should consider new building commissioning when building new facilities or undergoing major facility renovations. The process is best implemented through all phases of construction.

188

Potential Benefits of Commissioning California Homes  

NLE Websites -- All DOE Office Websites (Extended Search)

Potential Benefits of Commissioning California Homes Title Potential Benefits of Commissioning California Homes Publication Type Report LBNL Report Number LBNL-48258 Year of...

189

Federal Energy Management Program: Types of Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

of Commissioning to someone by E-mail Share Federal Energy Management Program: Types of Commissioning on Facebook Tweet about Federal Energy Management Program: Types of...

190

Residential Commissioning: A Review of Related Literature  

NLE Websites -- All DOE Office Websites (Extended Search)

Residential Commissioning: A Review of Related Literature Title Residential Commissioning: A Review of Related Literature Publication Type Report LBNL Report Number LBNL-44535 Year...

191

Commission on Energy Efficiency Standards and Practices  

NLE Websites -- All DOE Office Websites (Extended Search)

Submitted in Compliance with Iowa Code Section 103A.27 January1, 2011 Commission on Energy Efficiency Standards and Practices Commission on Energy Efficiency Standards and...

192

Nuclear Regulatory Commission issuances  

SciTech Connect

This document is the March 1996 listing of NRC issuances. Included are: (1) NRC orders granting Cleveland Electric Illuminating Company`s petition for review of the ASLB order LBP-95-17, (2) NRC orders relating to the potential disqualification of two commissioners in the matter of the decommissioning of Yankee Nuclear Power Station, (3) ASLB orders pertaining to the Oncology Services Corporation, (4) ASLB orders pertaining to the Radiation Oncology Center, (5) ASLB orders pertaining to the Yankee Nuclear Power Station, and (6) Director`s decision pertaining to the Yankee Nuclear Power Station.

NONE

1996-03-01T23:59:59.000Z

193

Technical Considerations for the Nuclear Regulatory Commission/ National Academy of Sciences Proposed Study: Cancer in Populations L iving Near Nuclear Facilities  

Science Conference Proceedings (OSTI)

The U.S. Nuclear Regulatory Commission (NRC), through the National Academy of Sciences (NAS), is updating the 1990 U.S. National Institutes of Health - National Cancer Institute (NCI) report, Cancer in Populations Living near Nuclear Facilities. The Electric Power Research Institute (EPRI) formed a committee of scientists and professionals in the fields of epidemiology, radiation biology, nuclear plant effluents, and environmental risk assessment to provide study design considerations to the NAS committe...

2011-11-04T23:59:59.000Z

194

OVERVIEW OF THE U.S. DEPARTMENT OF ENERGY AND NUCLEAR REGULATORY COMMISSION PERFORMANCE ASSESSMENT APPROACHES: CEMENTITIOUS BARRIERS PARTNERSHIP  

SciTech Connect

Engineered barriers including cementitious barriers are used at sites disposing or contaminated with low-level radioactive waste to enhance performance of the natural environment with respect to controlling the potential spread of contaminants. Drivers for using cementitious barriers include: high radionuclide inventory, radionuclide characteristics (e.g., long half-live, high mobility due to chemical form/speciation, waste matrix properties, shallow water table, and humid climate that provides water for leaching the waste). This document comprises the first in a series of reports being prepared for the Cementitious Barriers Partnership. The document is divided into two parts which provide a summary of: (1) existing experience in the assessment of performance of cementitious materials used for radioactive waste management and disposal and (2) sensitivity and uncertainty analysis approaches that have been applied for assessments. Each chapter is organized into five parts: Introduction, Regulatory Considerations, Specific Examples, Summary of Modeling Approaches and Conclusions and Needs. The objective of the report is to provide perspective on the state of the practice for conducting assessments for facilities involving cementitious barriers and to identify opportunities for improvements to the existing approaches. Examples are provided in two contexts: (1) performance assessments conducted for waste disposal facilities and (2) performance assessment-like analyses (e.g., risk assessments) conducted under other regulatory regimes. The introductory sections of each section provide a perspective on the purpose of performance assessments and different roles of cementitious materials for radioactive waste management. Significant experience with assessments of cementitious materials associated with radioactive waste disposal concepts exists in the US Department of Energy Complex and the commercial nuclear sector. Recently, the desire to close legacy facilities has created a need to assess the behavior of cementitious materials for applications in environmental remediation and decontamination and decommissioning (D&D) applications. The ability to assess the use and benefits of cementitious materials for these applications can significantly affect decisions related to cleanup activities. For example the need for costly remedial actions may not be necessary if existing or new cementitious barriers were adequately represented. The sections dealing with regulatory considerations include summaries of the different regulations that are relevant for various applications involving cementitious materials. A summary of regulatory guidance and/or policies pertaining to performance assessment of cementitious materials and sensitivity and uncertainty analyses is also provided in the following chapters. Numerous examples of specific applications are provided in each report. The examples are organized into traditional waste disposal applications (performance assessments), applications related to environmental remediation and D&D, and reactor and spent fuel related assessments. Sections that discuss specific facilities or sites contain: (1) descriptions of the role of the cementitious barriers or sensitivity/uncertainty analysis, (2) parameter assumptions and conceptual models, and (3) a relative discussion of the significance in the context of the assessment. Examples from both the U.S. Department of Energy Sites and the U.S. Nuclear Regulatory Commission are provided to illustrate the variety of applications and approaches that have been used. In many cases, minimal credit was taken for cementitious barriers. However, in some of those cases, benefits of being able to take credit for barriers were identified. The examples included: (1) disposal facilities (vaults, trenches, tank closures, cementitious waste forms and containers, etc.), (2) environmental remediation (old disposal facilities), (3) reactor and large structure decommissioning, and (4) spent fuel pools. These examples were selected to provide a perspective on the various ne

Langton, C.; Burns, H.

2009-05-29T23:59:59.000Z

195

Federal Energy Regulation Commission Issues Smart Grid ...  

Science Conference Proceedings (OSTI)

Federal Energy Regulation Commission Issues Smart Grid Policy Statement. For Immediate Release: July 17, 2009. ...

2012-06-04T23:59:59.000Z

196

Commissioning Building Systems for Improved Energy ...  

Science Conference Proceedings (OSTI)

Commissioning Building Systems for Improved Energy Performance Project. Summary: NIST will advance commercial building ...

2012-12-17T23:59:59.000Z

197

What's Up with the California Commissioning Collaborative?  

NLE Websites -- All DOE Office Websites (Extended Search)

What's Up with the California Commissioning Collaborative? What's Up with the California Commissioning Collaborative? Speaker(s): Kristin Heinemeier Date: July 8, 2005 - 12:00pm Location: Bldg. 90 The California Commissioning Collaborative's objectives are: --to improve building performance by developing and promoting viable building commissioning practices in California; --to facilitate the development of cost effective programs, tools, techniques and service delivery infrastructure to enable the implementation of building commissioning processes; --to educate and inform concerning building commissioning processes; and --to identify opportunities, establish priorities and promote solutions relating to building commissioning processes in California. Find out about who the CCC is, and their latest activities,

198

European Commission | Open Energy Information  

Open Energy Info (EERE)

Commission Commission Name European Commission Place Brussels, Belgium Website http://ec.europa.eu/index_en.h Coordinates 50.8503396°, 4.3517103° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.8503396,"lon":4.3517103,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

199

Using Simulation Models for Building Commissioning  

E-Print Network (OSTI)

The International Energy Agency ECBCS Annex 40 Commissioning of Buildings and HVAC Systems for Improved Energy Performance task investigating Use of Whole Building Simulation in Commissioning has identified the following applications of whole simulation in the commissioning process: 1) during the design process; 2) in post-construction commissioning of new buildings; 3) design simulation for ongoing commissioning; 4) calibrated simulation for retro commissioning; 5) calibrated simulation for on-going commissioning; and 6) simulation to evaluate new control code. These applications are discussed and examples of each of these applications are provided. The only one of these which has been applied in routine commissioning projects is the use of calibrated simulation for retro commissioning. The other examples have been applied in a research setting, and costs must be lowered for routine application, but there appears to be potential for significant application of simulation in the commissioning process.

Claridge, D. E.

2004-01-01T23:59:59.000Z

200

USING TECHNOLOGY TO SUPPORT PROACTIVE MANAGEMENT OF MATERIALS DEGRADATION FOR THE U.S. NUCLEAR REGULATORY COMMISSION  

SciTech Connect

The majority of the U.S. reactor fleet is applying for license renewal to extend the operating life from the current 40 years to 60 years, and there is now active interest in extending the operating life to beyond 60 years. Many plants are also applying for increases in power rating and both of these changes increases the need for an improved understanding of materials degradation. Many materials degrade over time and much is known about the degradation of materials under normal environmental conditions; however, less is known about the characteristics of materials degradation when the environment is subject to higher than normal radiological conditions over extended periods of time. Significant efforts are being made by industrial, academic and regulatory groups worldwide to identify, classify and mitigate potential problems arising from degradation of components in this context. From a regulatory perspective, the U.S. Nuclear Regulatory Commission (USNRC) is very interested in being able to identify ways to insure their licensees proactively manage the identification of materials degradation and the mitigation of its effects. To date, the USNRC has consolidated generic programs for mitigating aging issues in the two volume Generic Aging Lessons Learned (GALL) Report (NUREG-1801) [1][2], and have encouraged applicants for license renewal to use these programs where applicable in their plant when applying for renew of their reactors license. The USNRC has also published a comprehensive report entitled Expert Panel Report on Proactive Materials Degradation (NUREG/CR-6923) [3] that inventories the types of degradation mechanisms that could exist in each component of a Light Water Reactor (LWR) and each degradation mechanism is assessed regarding how much is known about mitigating its effects. Since the number of plant designs and materials used varies greatly within the U.S. fleet, there are many variations to implementing aging management programs (AMPs), requiring significant dialogs between the Licensee and the USNRC. These discussions are part of the licensing basis and as such are documented with up to multi-hundred page responses that are loosely coupled through the USNRC Agency-wide Document Access and Management System (ADAMS), which serves as an electronic records repository for the USNRC . These discussions have supported revisions to the GALL, including the revision that is being prepared as this paper is being written. The USNRC has sought the help of the Pacific Northwest National Laboratory to improve the staffs ability to navigate the significant numbers of documents that are generated in this process and to provide a forum for regulators, licensees and researchers to share knowledge in the efforts to improve the cyclic process for defining, applying, validating and re-defining AMPs. Work to date in this area is publicly accessible and this paper will describe that work and outline a potential path forward. The presenter will also demonstrate the capabilities of the PMMD information tools (http://pmmd.pnl.gov).

Taylor, W Boyd; Knobbs, Katherine J.; Carpenter, C. E. (Gene) [Gene; Malik, Shah

2010-07-19T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Commissioning of the ATLAS Experiment  

E-Print Network (OSTI)

The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The sub-detector integration in recent milestone weeks is described. Cosmic commissioning in milestone week M6 included simultaneous data-taking and combined track analysis of the muon detector and inner detector, as well as combined analysis of muon detector and muon trigger. The calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The high-level-trigger infrastructure is being installed and algorithms tested in technical runs.

Juergen Thomas; for the ATLAS Collaboration at CERN

2008-08-07T23:59:59.000Z

202

Commissioning Results of the Upgraded Neutralized Drift Compression Experiment  

E-Print Network (OSTI)

COMMISSIONING RESULTS OF THE UPGRADED NEUTRALIZED DRIFTexperiments. We report on commissioning results of the

Lidia, S.M.

2009-01-01T23:59:59.000Z

203

California Energy Commission Apply Today!  

E-Print Network (OSTI)

photovoltaic project in the future. Peak Demand Savings: 95 kW Energy Savings: 1,510,849 kWh Annual Energy CostCalifornia Energy Commission Apply Today! "The College implemented all of the recommended projects Programs Office (916) 654-4147 pubprog@energy.state.ca.us "CEC financing allowed us to install many

204

California Energy Commission STAFF DRAFT  

E-Print Network (OSTI)

efficiency small engined cars, hybrid cars, biofuels and a significant switch to public transport. Tough) and to diesel and biofuels for cars. It is the aim of the European Commission that the EU ETS scheme under stable market conditions. Current volatility in wholesale electricity markets works against

205

Best Practices in Existing Building Commissioning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OCTOBER 20-21, 2010 OCTOBER 20-21, 2010 RAPID CITY, SD Best Practices in Existing Building Commissioning Carl E. Lundstrom, P. E., CCP Federal Solutions Manager E M C Engineers, Inc. - Subsidiary of Eaton Corporation * The Purpose & Benefits of Existing Building Commissioning (EBCx) * The Building Commissioning Association (BCA) & "Best Practices" * Contracting & Hiring Qualified Providers * Typical Measures & Ideal Facilities * Success Factors Presentation Agenda What is The Building Commissioning Association? Integrity Leadership Quality Expertise  International non-profit organization (founded in 1998)  Recognized commissioning authority and resource  Commissioning providers, building owners, energy companies, facility managers, architects, engineers, and contractors

206

A compilation of reports of the Advisory Committee on Reactor Safeguards, 1997 annual, U.S. Nuclear Regulatory Commission. Volume 19  

Science Conference Proceedings (OSTI)

This compilation contains 67 ACRS reports submitted to the Commission, or to the Executive Director for Operations, during calendar year 1997. It also includes a report to the Congress on the NRC Safety Research Program. Specific topics include: (1) advanced reactor designs, (2) emergency core cooling systems, (3) fire protection, (4) generic letters and issues, (5) human factors, (6) instrumentation, control and protection systems, (7) materials engineering, (8) probabilistic risk assessment, (9) regulatory guides and procedures, rules, regulations, and (10) safety research, philosophy, technology and criteria.

NONE

1998-04-01T23:59:59.000Z

207

Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Kent Norris

2010-02-01T23:59:59.000Z

208

Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission  

SciTech Connect

This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

Kent Norris

2010-03-01T23:59:59.000Z

209

COMMISSION  

E-Print Network (OSTI)

amended), the National Science Foundation announces the following meeting: Name: Advisory Committee for Polar Programs (1130). Date/Time: May 29, 2008, 8 a.m. to 5 p.m.

Committee Act (pub L

2008-01-01T23:59:59.000Z

210

U. S. Atomic Energy Commission  

Office of Legacy Management (LM)

Commission Commission Division of Licensing and Regulation Washington 25, D. C. Attention: Mr. Eber R. Price Gentlemen: This is in response to your letter of 17 April 1962 regarding the inspection conducted at our Jayhawk Works at Pittsburg, Kansas on May Z-5, 1961 under Source Material License C-4352 and Special Nuclear Material Licenses No. SW-154 and S.Iw-329. Reblying to your items as listed in your letter, we submit the following in- formation'for your consideration: I. Time-occupancy studies have been made in the area where high air-borne dust samples "ere observed. A. Incidents Involving Thorium Six incidents have bee" noted involving thorium, natural isotopic ClSS=y. The counts of the air samples in these six samples are as follows: Microcuries per ml of Air

211

U. S. Atomic Energy Commission  

Office of Legacy Management (LM)

Commission Commission Division of Licensing and Regulation Washington 25, D. C. .I,.----- Attention: Mr. Eber R. Price Gentlemen: ' B?&-# This is in response to your letter of 17 April 1962 regarding the inspection conducted at our Jayhawk Works at Pittsburg, Kansas on May 2-5, 1961 under Source Material License C-4352 and Special Nuclear Material Licenses No. S&l-154 and SNM-329. Replying to your items as listed in your letter, we submit the following in- formation'for your consideration: I. Time-occupancy studies have been made in the area where high air-borne dust samples were observed. A. I&dents Involving Thorium Six incidents have been noted involving thorium, natural isotopic CLSS5.Y. follows: The counts of the air samples in these six samples are as

212

Commissioning the CDF offline software  

SciTech Connect

CDF II is one of the two large collider experiments at Fermilab's Tevatron. Over the past two years we have commissioned the offline computing system. A task that has involved bringing up hundreds of computers and millions of lines of C++ software. This paper reports on this experience, concentrating on the software aspects of the project. We will highlight some of the successes as well as describe some of the work still to do.

Elizabeth Sexton-Kennedy and Pasha Murat

2004-03-17T23:59:59.000Z

213

On Line Beamline Commissioning Activity Approval Form  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning Activity Approval Form Commissioning Activity Approval Form This form is to be filled by the Commissioning Activity Team Leader. No beamline commissioning activities will be allowed to run without a properly completed, approved, and posting of this commissioning approval form. You will be notified by e-mail upon approval. Sector Beamline Expected Start Date Expected Duration 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 BM ID ( Give a Unit) Activity Description( Give only a brief description) Commissioning Team Members First and Last Name Affiliation Phone Number 1. 2. 3. 4. 5. 6. Special Safety Concerns Commissioning Activity Team Leader Name E-Mail Address Submit Commissioning Activity Approval Form Clear all Fields and start All over again!!!

214

TB-14 Section 8 - Beamline Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

8. Beamline Commissioning (Rev. July 21, 1998) A beamline commissioning process has been instituted to ensure that all systems are in place so that a beamline can perform in a safe...

215

Flathead Basin Commission Act of 1983 (Montana)  

Energy.gov (U.S. Department of Energy (DOE))

This Act establishes the Flathead Basin Commission, the purpose of which is to protect the Flathead Lake aquatic environment, its waters, and surrounding lands and natural resources. The Commission...

216

Design and Commissioning of a Laboratory Scale ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2012 TMS Annual Meeting & Exhibition. Symposium , Electrometallurgy 2012. Presentation Title, Design and Commissioning of a...

217

Experience with Commissioning New Generation Gas Suspension ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2013 TMS Annual Meeting & Exhibition. Symposium , Alumina and Bauxite. Presentation Title, Experience with Commissioning...

218

Commissioning of Emirates Aluminium Smelter Potlines  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2012 TMS Annual Meeting & Exhibition. Symposium , Aluminum Reduction Technology. Presentation Title, Commissioning of...

219

Occupational Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities 2010, Prepared for the Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, May 2012  

SciTech Connect

This report summarizes the occupational exposure data that are maintained in the U.S. Nuclear Regulatory Commissions (NRC) Radiation Exposure Information and Reporting System (REIRS). The bulk of the information contained in the report was compiled from the 2010 annual reports submitted by five of the seven categories of NRC licensees subject to the reporting requirements of 10 CFR 20.2206. Because there are no geologic repositories for high-level waste currently licensed and no NRC-licensed low-level waste disposal facilities currently in operation, only five categories will be considered in this report. The annual reports submitted by these licensees consist of radiation exposure records for each monitored individual. These records are analyzed for trends and presented in this report in terms of collective dose and the distribution of dose among the monitored individuals. Annual reports for 2010 were received from a total of 190 NRC licensees. The summation of reports submitted by the 190 licensees indicated that 192,424 individuals were monitored, 81,961 of whom received a measurable dose. When adjusted for transient workers who worked at more than one licensee during the year, there were actually 142,471 monitored individuals and 62,782 who received a measurable dose. The collective dose incurred by these individuals was 10,617 person-rem, which represents a 12% decrease from the 2009 value. This decrease was primarily due to the decrease in collective dose at commercial nuclear power reactors, as well as a decrease in the collective dose for most of the other categories of NRC licensees. The number of individuals receiving a measurable dose also decreased, resulting in an average measurable dose of 0.13 rem for 2010. The average measurable dose is defined as the total effective dose equivalent (TEDE) divided by the number of individuals receiving a measurable dose. In calendar year 2010, the average annual collective dose per reactor for light water reactor (LWR) licensees was 83 person-rem. This represents a 14% decrease from the value reported for 2009 (96 person-rem). The decrease in collective dose for commercial nuclear power reactors was due to an 11% decrease in total outage hours in 2010. During outages, activities involving increased radiation exposure such as refueling and maintenance are performed while the reactor is not in operation. The average annual collective dose per reactor for boiling water reactors (BWRs) was 137 personrem for 35 BWRs, and 55 person-rem for 69 pressurized water reactors (PWRs). Analyses of transient individual data indicate that 29,333 individuals completed work assignments at two or more licensees during the monitoring year. The dose distributions are adjusted each year to account for the duplicate reporting of transient individuals by multiple licensees. The adjustment to account for transient individuals has been specifically noted in footnotes in the figures and tables for commercial nuclear power reactors. In 2010, the average measurable dose per individual for all licensees calculated from reported data was 0.13 rem. Although the average measurable dose per individual from data submitted by licensees was 0.13 rem, a corrected dose distribution resulted in an average measurable dose per individual of 0.17 rem.

D. E. Lewis D. A. Hagemeyer Y. U. McCormick

2012-07-07T23:59:59.000Z

220

Corporation Commission Hydraulic FracturingHydraulic Fracturing  

E-Print Network (OSTI)

Corporation Commission Hydraulic FracturingHydraulic Fracturing Joint Committee on Energy Commission What is Hydraulic Fracturing d H D It W k?and How Does It Work? · Stimulates a well to increase by Stanolind Oil Company. 2 #12;Kansas Corporation Commission Are Hydraulic Fracture Jobs Performed in Kansas

Peterson, Blake R.

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

CALIFORNIA POSTSECONDARY EDUCATION COMMISSION PRESS RELEASE  

E-Print Network (OSTI)

CALIFORNIA POSTSECONDARY EDUCATION COMMISSION PRESS RELEASE Contact: Linda White California Postsecondary Education Commission 1303 J Street, Suite 500 Sacramento, California 95814-2938 (916) 322-7984 lwhite@cpec.ca.gov Commission Awards $1,889,657 Grant to California State University Fullerton to Improve

de Lijser, Peter

222

Texas Commission on Environmental Quality | Open Energy Information  

Open Energy Info (EERE)

Texas Commission on Environmental Quality Jump to: navigation, search Logo: Texas Commission on Environmental Quality Name Texas Commission on Environmental Quality Address 12100...

223

Automated Demand Response Strategies and Commissioning Commercial Building Controls  

E-Print Network (OSTI)

Conference on Building Commissioning: April 19-21, 2006Auto-DR Strategies and Commissioning One common questionConference on Building Commissioning: April 19-21, 2006

Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila; Linkugel, Eric

2006-01-01T23:59:59.000Z

224

Results and commissioning issues from an automated demand response pilot  

E-Print Network (OSTI)

Conference on Building Commissioning. May 2002. Motegi,et al: Results and Commissioning Issues from an AutomatedConference on Building Commissioning: May 1e-20, 2004

Piette, Mary Ann; Watson, Dave; Sezgen, Osman; Motegi, Naoya

2004-01-01T23:59:59.000Z

225

Commissioning of the superconducting ECR ion source VENUS  

E-Print Network (OSTI)

COMMISSIONING OF THE SUPERCONDUCTING ECR ION SOURCE VENUS *paper describes the ongoing commissioning. Initial resultscoils [2]. During commissioning of the superconducting

Leitner, Daniela; Abbott, Steve R.; Dwinell, Roger D.; Leitner, Matthaeus; Taylor, Clyde; Lyneis, Claude M.

2003-01-01T23:59:59.000Z

226

PP-54 Ontario Hydro Electric Power Commission | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Ontario Hydro Electric Power Commission PP-54 Ontario Hydro Electric Power Commission Presidential Permit authorizing Ontario Hydro Electric Power Commission to construct,...

227

Beyond Commissioning: The Role of Automation  

Science Conference Proceedings (OSTI)

This article takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that's performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. The article then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

Brambley, Michael R.; Katipamula, Srinivas

2005-02-01T23:59:59.000Z

228

National Energy Commission (China) | Open Energy Information  

Open Energy Info (EERE)

China) China) Jump to: navigation, search Name National Energy Commission (China) Place Beijing References National Energy Commission (China)[1] No information has been entered for this organization. Add Organization This article is a stub. You can help OpenEI by expanding it. National Energy Commission (China) is a new, high level, 21 member interagency commission based in Beijing, China, and is responsible for China's new energy law (expected 1/1/2011). [2] National Development and Reform Commission, Ministry of Environmental Protection (China) See also Government_policy_and_investment_in_clean_energy_(China) Key Facts Members Li Junfeng, National Development and Reform Commission ____, People's Liberation Army References ↑ "National Energy Commission (China)"

229

NIST Blue Ribbon Commission on Management and Safety ? ...  

Science Conference Proceedings (OSTI)

NIST Blue Ribbon Commission on Management and Safety II. The NIST Blue Ribbon Commission on Management and ...

2012-08-27T23:59:59.000Z

230

NIST Blue Ribbon Commission on Management and Safety ...  

Science Conference Proceedings (OSTI)

... See NIST Blue Ribbon Commission on Management and Safety II. NIST Blue Ribbon Commission on Management and Safety. ...

2010-10-05T23:59:59.000Z

231

UNITED STATES ATOMIC ENERGY COMMISSION  

Office of Legacy Management (LM)

I(S.0 -01: I(S.0 -01: SPECIAL NUCLEAR MATERIAL LlCEWSE Pursuant to the Atomic Energy Act of 1954 and Title 10, Code of Federal Regulations, Chapter 1, Part 70, "Special Nuclear Material Regulations," o. license is hereby issued authorizing the licensee to receive and possess the special nuclear material designated below; to use such special nuclear material for the purpose(s) and at the place(s) designated below; and to transfer such material to persons' authorized to receive it in accordance with the regulations in said Port. This license shall be deemed to contain the conditions specified in Section 70.32(a) of said regulations, and is subject to all applicable rules, regtdations, and orders of the Atomic Energy Commission now or hereafter in

232

The Operation of the Low Pay Commission  

E-Print Network (OSTI)

were the Human Resources Director of a major hotel and catering group, the Human Resources Policy Director (later promoted to Deputy Director-General) of the Confederation of British Industry, and the Chief Executive of a retailers federation... of the Commission, to the Inland Revenue which tackled the task with energy, imagination and common sense. The Government also simplified the Commissions task by prejudging certain aspects of the National Minimum Wage. Particularly important was that it should...

Brown, William

2004-06-16T23:59:59.000Z

233

Regional Districts, Commissions, and Authorities (South Carolina) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regional Districts, Commissions, and Authorities (South Carolina) Regional Districts, Commissions, and Authorities (South Carolina) Regional Districts, Commissions, and Authorities (South Carolina) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State South Carolina Program Type Siting and Permitting Provider Regional Districts, Commissions, and Authorities

234

Existing Building Commissioning (EBCx) Project Considerations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Existing Building Existing Building Commissioning (EBCx) Project Considerations Phil Welker, Executive Director PECI 2 Mapping Out Your Commissioning Strategy Three big questions: 1. Which buildings are commissioning candidates? 2. What commissioning approach(es) should I employ? 3. What expertise do I need to get it done? 3 Which buildings? Many factors come in to play: * Building sizes * Project budgets * Current energy performance * Building control systems * Occupancy rates * Operator/ engineering resources * Long term investment strategy * Sustainability plans or mandates * Equipment Replacements Selecting the right buildings is critical to achieve the maximum benefit in a cost-efficient manner. See the EPA's "A Retrocommissioning Guide for Building Owners"

235

Commission on Energy Efficiency Standards and Practices  

NLE Websites -- All DOE Office Websites (Extended Search)

Final Report to the Governor Final Report to the Governor and the Iowa General Assembly Submitted in Compliance with Iowa Code Section 103A.27 January1, 2011 Commission on Energy Efficiency Standards and Practices Commission on Energy Efficiency Standards and Practices 2 Table of Contents Commission Members page 3 Executive Summary page 4 Summary of Recommendations page 5 Legislative Overview page 12 Profile on Iowa's Energy Usage page 14 Commission Proceedings page 15 Recommendations Energy Code Adoption & Compliance page 20 Financing & Incentives page 25 Training and Education page 29 Licensing and Certification page 31 Additional Energy Efficiency Recommendations page 32

236

Notices ELECTION ASSISTANCE COMMISSION Agency Information Collection  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23 Federal Register 23 Federal Register / Vol. 76, No. 180 / Friday, September 16, 2011 / Notices ELECTION ASSISTANCE COMMISSION Agency Information Collection Activities: Proposed Collection; Comment Request; Election Assistance Commission's Voting System Test Laboratory Program Manual, Version 1.0 AGENCY: U.S. Election Assistance Commission (EAC). ACTION: Notice; comment request. SUMMARY: As part of its continuing effort to reduce paperwork and respondent burden in accordance with the Paperwork Reduction Act of 1995, the U.S. Election Assistance Commission (EAC) invites the general public and other Federal agencies to take this opportunity to comment on EAC's request to renew an existing information collection, EAC's Voting System Test Laboratory Program Manual, Version

237

Step 5: Commission the building | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

Specify detailed commissioning activities in the project contracts. Ensure that your architect or engineer transfers technical documents to the building's operations and...

238

ORLANDO UTILITIES COMMISSION RFP No. 2400 QQ  

NLE Websites -- All DOE Office Websites (Extended Search)

ORLANDO UTILITIES COMMISSION REQUEST FOR PROPOSAL For GREEN ENERGY PROGRAM RFP NO. 2400 OQ COMMISSIONERS LONNIE C. BELL President KATIE PORTA First Vice President MAYLEN DOMINGUEZ...

239

A History of the Atomic Energy Commission  

Energy.gov (U.S. Department of Energy (DOE))

A History of the Atomic Energy Commission - written by Alice L. BuckWashington, D.C.: U.S. Department of Energy, July 1983.41 pp.

240

The Fenno-Skan HVDC link commissioning  

Science Conference Proceedings (OSTI)

The commissioning of the Fenno-Skan HVDC link between Finland and Sweden, with the longest submarine dc cable in the world, is described. The main pre-commissioning activities, important for an efficient commissioning, are discussed together with time schedules and suitable organization forms. The procedures to test special control features, such as subsynchronous oscillation (SSO) damping control are presented. The full scale network interaction tests which are an important part of the commissioning are also discussed. These tests succeeded very well and provided a lot of information about the system behavior for future operation and planning purposes.

Nyman, A. (Swedish State Power Board, Vaellingby (Sweden)); Jaeaeskelaeinen, K.; Vaitomaa, M. (Imatran Voima OY, Vantaa (Finland)); Jansson, B.; Danielsson, K.G. (ABB Power Systems, Ludvika (Sweden))

1994-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

County Land Preservation and Use Commissions (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

This ordinance creates Land Preservation and Use Commissions in each county to provide for the orderly use and development of land, to protect agricultural land from nonagricultural development,...

242

IMAGINE Officially Starts Commissioning | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

The IMAGINE team present for the official start of commissioning. Doug Selby, HFIR instrument coordinator, hands the shutter keys to IMAGINE instrument scientist Flora...

243

SNS BEAM COMMISSIONING TOOLS AND EXPERIENCE  

Science Conference Proceedings (OSTI)

The Spallation Neutron Source (SNS) successfully met the primary construction project completion milestones in April 2006. An important ingredient of this successful commissioning was the development and use of software tools. With the increasing digitalization of beam diagnostics and increasing complexity of Integrated Control Systems of large accelerators, the need for high level software tools is critical for smooth commissioning. At SNS a special Java based infrastructure called XAL was prepared for beam commissioning. XAL provides a hierarchal view of the accelerator, is data base configured, and includes a physics model of the beam. This infrastructure and individual applications development along with a historical time line of the SNS commissioning will be discussed.

Shishlo, Andrei P [ORNL; Galambos, John D [ORNL

2008-01-01T23:59:59.000Z

244

California Energy Commission - Electricity Consumption by Planning...  

Open Energy Info (EERE)

Planning Area (1990-2009) Electricity consumption data from the California Energy Commission by planning area for Commercial, Residential, Ag & Water Pump, Streetlight,...

245

Nevada Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Page Edit History Facebook icon Twitter icon Nevada Public Utilities Commission Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleNevadaPublic...

246

Nuclear Regulatory Commission Issuances: Opinions and decisions of the Nuclear Regulatory Commission with selected orders. Progress report, January 1, 1996--June 30, 1996. Volume 43, pages 1-358  

Science Conference Proceedings (OSTI)

The hardbound edition of the Nuclear Regulatory Issuances is a final compilation of the monthly issuances. It includes all legal precedents for the agency within a six month period. This is the forty-third volume of issuances.

NONE

1997-05-01T23:59:59.000Z

247

Automated Commissioning for Lower-Cost, Widely Deployed Building Commissioning of the Future  

Science Conference Proceedings (OSTI)

This book chapter takes a brief look at the benefits of building commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems.

Brambley, Michael R.; Katipamula, Srinivas

2007-01-31T23:59:59.000Z

248

STATE OF CALIFORNIA THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

Regulatory Commission (FERC) to continue operating its Klamath River Hydroelectric Project, which is located Hydroelectric Project, California Energy Commission Consultant Report, Publication No.700-2006-010, November COMMISSION 1516 NINTH STREET SACRAMENTO, CA 95814-5512 www.energy.ca.gov October 29, 2007 Mr. Paul Clanon

249

Notice of Decision by the California Energy Commission To: California Resources Agency From: California Energy Commission  

E-Print Network (OSTI)

Notice of Decision by the California Energy Commission To: California Resources Agency From: California Energy Commission 1416 9th Street, Room 1311 1516 9th Street MS-2000 Sacramento, CA 95814 21080.5 and Title 20, California Code of Regulations, Section 1768 Project Name: 1 Energy Commission

250

Remedial action plan for the inactive uranium processing site at Naturita, Colorado. DOE responses to comments from U.S. Nuclear Regulatory Commission and Colorado Department of Public Health and Environment  

SciTech Connect

This report contains responses by the US Department of Energy to comments from the US Nuclear Regulatory Commission and the Colorado Department of Public Health and Environment on the Naturita remedial action plan. This was done in an attempt to clarify information. The site is an inactive uranium processing site at Naturita, Colorado.

NONE

1998-11-16T23:59:59.000Z

251

Implementation Update Black and Gold Commission  

E-Print Network (OSTI)

Implementation Update Black and Gold Commission June, 2003 1 Action Item/ Major Initiative Outcomes Policies and Practices of UWM with principles and goals of Black & Gold Commission UWM culture supports Senate; Student Association; Classified Employee Groups; Deans & Division Heads Spirit of the Black

Saldin, Dilano

252

California Solar Initiative California Public Utilities Commission  

E-Print Network (OSTI)

for solar energy by dramatically reducing the cost of solar. As part of the statewide solar effort, the CPUC of the state's solar offerings, such as the California Energy Commission's (Energy Commission) New Solar Homes Renewable Energy Council (IREC) released Larry Sherwood's U.S. Solar Market Trends for 2007 report

253

Commissioning of the T2K Beamline  

Science Conference Proceedings (OSTI)

The initial commissioning of the beam line for the T2K long baseline neutrino experiment was carried out in April and May of 2009. This paper contains an overview of the beam line components and presents initial results from the beam line commissioning.

Hartz, Mark [Department of Physics, University of Toronto, 60 St. George St., Toronto, M5S 1A7, Ontario (Canada)

2010-03-30T23:59:59.000Z

254

California Energy Commission DRAFT COMMITTEE REPORT  

E-Print Network (OSTI)

of the Energy Commission until the report is adopted. #12;i ABSTRACT These proposed electricity supply forms demand for energy and annual peak load will be met by specific supply resources. California Energy Commission. Electricity Supply Analysis Division. CEC2002010009CTD. #12;ii #12

255

Control System Commissioning for Enhanced Building Operations  

E-Print Network (OSTI)

This paper highlights the import role control systems play in the operation of modern buildings and describes ways to improve the final stage of commissioning. We also describe practical issues associated with modern IT-oriented control systems that can impact a commissioning exercise.

Salsbury, T. I.; Singhal, A.

2003-01-01T23:59:59.000Z

256

A Practical Guide for Commissioning Existing Buildings  

SciTech Connect

Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

Haasl, T.; Sharp, T.

1999-04-01T23:59:59.000Z

257

Automated Commissioning for Lower-cost, Widely Deployed Building Commissioning of the Future  

SciTech Connect

This chapter takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that is performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. This chapter then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

Brambley, Michael R.; Katipamula, Srinivas

2011-08-16T23:59:59.000Z

258

Commission ushers in new era in Mexican gas industry  

Science Conference Proceedings (OSTI)

Transportation and distribution of natural gas in Mexico are undergoing fundamental changes as a result of the 1995 passage by the Congress of Mexico of the law that created the Energy Regulatory Commission (Comision Reguladora de Energia--CRE). The law mandates that the commission must achieve a competitive, efficient, safe, and sustainable gas industry, allowing the country to make the difficult energy transition to open gas and electricity markets relying on cleaner fuels. The paper discusses the situation before CRE, the regulatory framework, market development, and the North American market.

Monteforte, R. [Energy Regulatory Commission of Mexico, Mexico City (Mexico)

1998-04-06T23:59:59.000Z

259

Hutchinson Utilities Commission - Residential Energy Efficiency Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hutchinson Utilities Commission - Residential Energy Efficiency Hutchinson Utilities Commission - Residential Energy Efficiency Program Hutchinson Utilities Commission - Residential Energy Efficiency Program < Back Eligibility Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Appliances & Electronics Heat Pumps Commercial Lighting Lighting Water Heating Maximum Rebate 500 Program Info Expiration Date program offered until expiration of funding State Minnesota Program Type Utility Rebate Program Rebate Amount Natural Gas Furnaces: $150-$250, depending on efficiency Natural Gas Furnace Tune-up: $25 ECM Motor: $75 Natural Gas Boilers: $200 Central Air Conditioners: $250 Central Air Conditioner Tune-up: $25 Tankless Gas Water Heaters: $150 Storage Gas Water Heaters: $50 Air Source Heat Pumps: $75/ton

260

Department of Energy Awards Eddy/Lea Regional Commission $300...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EddyLea Regional Commission 300,000 Grant Department of Energy Awards EddyLea Regional Commission 300,000 Grant Department of Energy Awards EddyLea Regional Commission...

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

California Energy Commission Library Recent Acquisitions January March 2012  

E-Print Network (OSTI)

California Energy Commission Library Recent Acquisitions January ­ March 2012 AIR: California Public Utilities Commission Conference: CPUC Energy Symposium (1980: Stanford University) Publisher: California Public Utilities Commission Year: 1980 Call number: B.65/E5682/1980 The very

262

California Energy Commission Library Recent Acquisitions October December 2011  

E-Print Network (OSTI)

California Energy Commission Library Recent Acquisitions October ­ December 2011, Charles; Roberts, Miles Corp. Author: California Energy Commission, Emerging Fuels and Technologies Office Publisher: California Energy Commission Year: 2011 Call number: INTERNET CEC Pub. #: CEC

263

Commissioning and early experiments of the PHELIX facility  

E-Print Network (OSTI)

009-3855-7 Commissioning and early experiments of the PHELIXthe recent years, the commissioning and operation of high-paper, we report on the commissioning of the PHELIX facility

2010-01-01T23:59:59.000Z

264

Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 4. Evaluation of other loads and load combinations  

SciTech Connect

Six topical areas were covered by the Task Group on Other Dynamic Loads and Load Combinations as described below: Event Combinations - dealing with the potential simultaneous occurrence of earthquakes, pipe ruptures, and water hammer events in the piping design basis; Response Combinations - dealing with multiply supported piping with independent inputs, the sequence of combinations between spacial and modal components of response, and the treatment of high frequency modes in combination with low frequency modal responses; Stress Limits/Dynamic Allowables - dealing with inelastic allowables for piping and strain rate effects; Water Hammer Loadings - dealing with code and design specifications for these loadings and procedures for identifying potential water hammer that could affect safety; Relief Valve Opening and Closing Loads - dealing with the adequacy of analytical tools for predicting the effects of these events and, in addition, with estimating effective cycles for fatigue evaluations; and Piping Vibration Loads - dealing with evaluation procedures for estimating other than seismic vibratory loads, the need to consider reciprocating and rotary equipment vibratory loads, and high frequency vibratory loads. NRC staff recommendations or regulatory changes and additional study appear in this report.

Not Available

1984-12-01T23:59:59.000Z

265

Texas Historical Commission | Open Energy Information  

Open Energy Info (EERE)

Historical Commission Historical Commission Jump to: navigation, search Logo: Texas Historical Commission Name Texas Historical Commission Address 1511 Colorado St. Place Austin, Texas Zip 78701 Year founded 1953 Phone number 512.463.6100 Website http://www.thc.state.tx.us/ Coordinates 30.2779484°, -97.7403973° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.2779484,"lon":-97.7403973,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

266

Retro-Commissioning Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Retro-Commissioning Program Retro-Commissioning Program Retro-Commissioning Program < Back Eligibility Commercial Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Other Maximum Rebate $200,000 per site per calendar year $400,000 per customer per calendar year for all Focus incentives Program Info Funding Source Focus on Energy Program Start Date 09/01/2012 State Wisconsin Program Type State Rebate Program Rebate Amount $0.08/kWh or $0.50/therm saved for installed measures Focus on Energy offers financial incentives to eligible business customers to retro-commission buildings to optimize performance. The program provides incentives for building efficiency studies based on the size of the

267

LINE Commission Visits Idaho National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

LINE Commission Visits Idaho National Laboratory Members of the state of Idaho�s Leadership in Nuclear Energy (LINE) Commission recently visited the Idaho National Laboratory and related DOE-Idaho cleanup facilities. These photos show commission members at the Materials and Fuels Complex, where Steve Marschman from INL talks to the commission members, and the Advanced Mixed Waste Treatment Facility. At the AMWTP, members saw the supercompactor as Facility Manager Jeremy Hampton explained how it worked. Participants included, from top right in the INL: INL Laboratory Director John Grossenbacher; North Wind Group President Sylvia Median; former Idaho U.S. Senator Larry Craig; Idaho Department of Labor�s Dwight Johnson; BEA Government Affairs Boise Manager Brian Whitlock; and Idaho House District 33 Rep. Jeff Thompson.

268

California Energy Commission COMMITTEE FINAL REPORT  

E-Print Network (OSTI)

of the California Energy Commission's Strategic Transmission Planning Office, Electricity Analysis Office electric transmission system facilities on their bulk transmission network and on specific projects Policy Report and the 2011 Strategic Transmission Investment Plan. Keywords: Electric transmission, bulk

269

California Energy Commission DRAFT STAFF REPORT  

E-Print Network (OSTI)

of the California Energy Commission's Strategic Transmission Planning Office, Electricity Analysis Office electric transmission system facilities on their bulk transmission network and on specific projects and the 2011 Strategic Transmission Investment Plan. Keywords: Electric transmission, bulk electric

270

California Solar Initiative California Public Utilities Commission  

E-Print Network (OSTI)

California Solar Initiative California Public Utilities Commission Staff Progress Report July 2008 #12;California Solar Initiative, CPUC Staff Progress Report, July 2008: Zerull Location: San Rafael, CA System size: 14 kW Funded by the California Solar Initiative

271

California Public Utilities Commission California Solar Initiative  

E-Print Network (OSTI)

California Public Utilities Commission California Solar Initiative Program Handbook September 2012Power #12;Table of Contents i California Solar Initiative Program Handbook September 2012 1. Introduction: California Solar Initiative Program....................................................................1 1

272

California Solar Initiative California Public Utilities Commission  

E-Print Network (OSTI)

California Solar Initiative California Public Utilities Commission Staff Progress Report January 2008 #12;California Solar Initiative, CPUC Staff Progress Report, January 2008 This page intentionally left blank. #12;California Solar Initiative, CPUC Staff Progress Report, January 2008 Table of Contents

273

Forestry Commission Scotland 231 Corstorphine Road  

E-Print Network (OSTI)

development - Forestry - Sustainable development - Renewable Energy - Community development - Financial Forestry Sustainable development Renewable Energy Community development Financial management Housing, ethnicity, gender, marital status, religion, sexuality and transgender. #12;Annex 1: FORESTRY COMMISSION

274

ALICE Commissioning: Getting Ready for Physics  

E-Print Network (OSTI)

ALICE is a general-purpose heavy-ion detector at the CERN LHC. We describe the commissioning activities in the years 2007-2009 and the status of the different subsystems at the time of this conference.

C. Lippmann; for the ALICE collaboration

2009-05-11T23:59:59.000Z

275

California Energy Commission DRAFT STAFF REPORT  

E-Print Network (OSTI)

for energy and annual peak load will be met by specific supply resources. Keywords: Electricity) ................................................................ 19 Supply Form S2: Energy Balance Table ...................... California Energy Commission DRAFT STAFF REPORT FORMS AND INSTRUCTIONS FOR SUBMITTING

276

Checkout, Testing, and Commissioning Plan RM  

Energy.gov (U.S. Department of Energy (DOE))

The CP RM Module is a tool that assists DOE federal project review teams in evaluating the sufficiency of the Commissioning Plan and its implementation. The CP RM can be used by the DOE federal...

277

California Energy Commission - Electricity Consumption by County  

Open Energy Info (EERE)

County (2006-2009) Electricity consumption data from the California Energy Commission sorted by County for Residential and Non-residential from 2006 to 2009.


...

278

Delmarva - Commissioning and Operations Incentive Programs (Maryland...  

Open Energy Info (EERE)

Construction: up to 8,000 (design); 8,000 (commissioning); 6,000 (analysistesting) Energy Savings Study Incentive: Additional 75% of cost, up to 20,000 Operations and...

279

Nevada State Environmental Commission | Open Energy Information  

Open Energy Info (EERE)

Environmental Commission Environmental Commission Jump to: navigation, search Logo: Nevada State Environmental Commission Name Nevada State Environmental Commission Address 901 South Stewart Street, Suite 4001 Place Carson City, Nevada Zip 89701 Website http://www.sec.nv.gov/ Coordinates 39.1580849°, -119.7644949° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.1580849,"lon":-119.7644949,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

280

Electronic Forms & Pen Computers Improve Building Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

Electronic Forms & Pen Computers Improve Building Commissioning Speaker(s): Rich Sydlowski Date: August 8, 2001 - 12:00pm Location: Bldg. 90 Seminar HostPoint of Contact:...

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Monitoring Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU Projects  

E-Print Network (OSTI)

Buildings. California Commissioning Collaborative. Haasl,2006b. California Commissioning Guide: Existing Buildings.California Commissioning Collaborative. Haves, P. , and

Mills, Evan

2009-01-01T23:59:59.000Z

282

Building commissioning: The key to quality assurance  

SciTech Connect

This Guide is written to aid building owners and retrofit project managers currently participating in the Rebuild America program. The Guide provides information on implementing building commissioning projects that will optimize the results of existing building equipment improvements and retrofits projects. It should be used in coordination with Rebuild America`s Community Partnership Handbook. The Handbook describes, in detail, eight important steps necessary for planning and carrying out a community-wide energy-efficiency program. In step number 7 of the Handbook, commissioning is shown to be an integral aspect of implementing a building retrofit. The commissioning process ensures that a facility is safe, efficient, comfortable, and conducive to the presumed activities for which it was constructed. Rebuild America strongly encourages its partners to incorporate commissioning into their retrofit projects. By verifying the correct installation, functioning, operation, and maintenance of equipment, the commissioning process ensures that efficiency measures will continue to deliver benefits over the long term. Although commissioning can take place after the equipment has been installed, it is more effective when it takes place over the entire equipment installation process.

1998-05-01T23:59:59.000Z

283

Public Service Commission of Wisconsin | Open Energy Information  

Open Energy Info (EERE)

Public Service Commission of Wisconsin Jump to: navigation, search Name Public Service Commission of Wisconsin Address 610 North Whitney Way Place Madison, Wisconsin Zip 53707-7854...

284

Monitoring-based HVAC Commissioning of an Existing Office Building...  

NLE Websites -- All DOE Office Websites (Extended Search)

Monitoring-based HVAC Commissioning of an Existing Office Building for Energy Efficiency Title Monitoring-based HVAC Commissioning of an Existing Office Building for Energy...

285

TMS/ASM Joint Commission on Metallurgical Transactions  

Science Conference Proceedings (OSTI)

TMS/ASM Joint Commission on Metallurgical Transactions. The function of the Joint Commission is as follows: Consistent with the Purpose and Scope of...

286

California Energy Commission - Petroleum Weekly Fuels Watch Report...  

Open Energy Info (EERE)

California Energy Commission - Petroleum Weekly Fuels Watch Report (2010) Contains data from the California Energy Commission on weekly refinery production and stock...

287

California Energy Commission - Petroleum Weekly Fuels Watch Report...  

Open Energy Info (EERE)

California Energy Commission - Petroleum Weekly Fuels Watch Report (2000) Contains data from the California Energy Commission on weekly refinery production and stock...

288

California Energy Commission - Petroleum Weekly Fuels Watch Report...  

Open Energy Info (EERE)

California Energy Commission - Petroleum Weekly Fuels Watch Report (1999) Contains data from the California Energy Commission on weekly refinery production and stock...

289

Update on Blue Ribbon Commission for America's Nuclear Future...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Future Update on Blue Ribbon Commission for America's Nuclear Future BRC-SEAB-October-12%202011.pdf More Documents & Publications Blue Ribbon Commission on America's...

290

Energy Department and French Commission on Atomic Energy and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department and French Commission on Atomic Energy and Alternative Energies Sign New Research and Development Agreement Energy Department and French Commission on Atomic...

291

COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST FOR INFORMATION REGARDING SMART GRID POLICY COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST...

292

Including Retro-Commissioning in Federal Energy Savings Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

11.2 Retro-Cx in Federal ESPCs Including Retro-Commissioning In Federal Energy Saving Performance Contracts Retro-commissioning generally reduces operating and maintenance costs,...

293

Atomic Energy Commission Explores Peaceful Uses of Nuclear Explosions...  

National Nuclear Security Administration (NNSA)

Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > Atomic Energy Commission Explores Peaceful Uses of ... Atomic Energy Commission Explores Peaceful...

294

PP-03 Federal Power Commission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commission to construct, operate, and maintain electric transmission facilities at te U.S-Mexico border. PP-03 Federal Power Commission More Documents & Publications PP-35 Trico...

295

PP-13 Federal Power Commission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commission to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border. PP-13 Federal Power Commission More Documents & Publications PP-231...

296

Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fuels Fuels Taxation Study Commission to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission on Google Bookmark Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission on Delicious Rank Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuels Taxation Study Commission on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuels Taxation Study Commission

297

California Energy Commission - Natural Gas Consumption by Utility  

Open Energy Info (EERE)

California Energy Commission - Natural Gas Consumption by Utility (1990-2009) California Energy Commission natural gas consumption data by Utility company for Commercial,...

298

The California Energy Commission's geothermal activities  

SciTech Connect

Thank you for the invitation to participate in this distinguished gathering. I would like to briefly relate the interests of the California Energy Commission in geothermal energy. Geothermal energy is a basic component of many of our primary activities, and is expressly cited in our statutory authority, the Warren-Alquist Act (1974). Our mandates affect the geothermal industry both directly and indirectly. The Commission is responsible for 5-, 12-, and 20-year forecasts of California electricity supply and demand. These forecasts are reported in our biennial Electricity Report. These forecasts are used in various official regulatory proceedings. The primary use is in the Commission's power plant siting authority. The forecasts establish the base used to determine the need for new capacity and energy in the current planning period. The forecasts are also used in other Commission activities as well as in proceedings at the Public Utilities Commission. The 1990 Electricity Report represents a dramatic change in the way this agency balances the relative importance of price competition, environmental quality, demand management as a system resource, and the implications of continued reliance on natural gas. Generally, the Commission is grappling with the elusive and complex problems of quantifying the appropriate value to assign to external (i. e., non-market) environmental attributes of competing technologies. While we have not decisively established such values, we do believe that they do exist and that we are moving in the right direction. The adopted policies have positive long term implications for geothermal and the other renewable technologies. The Commission has been in existence since 1975 and during that time has seen the development of geothermal energy in several areas of the state. As a regulatory agency, we have authority over the construction of thermal electric plants over 50 megawatts (MW). To date the Commission has certified the construction of more than 1200 MW in the Geysers. This area is now experiencing a dramatic loss in productivity. The Commission is engaged in a cooperative effort with the parties operating in the Geysers to address the problem of resource productivity. We held a hearing to examine the causes of the decline of the geothermal steam resources and its affect on electric energy supply. An outcome of the hearing was the establishment of a Technical Advisory Committee with the responsibility of providing the Commission projections of capacity and energy under the current rates of steam decline. The Committee was also charged with examining options on efficient resource management, including research and development, testing, and analyses regarding reservoir and power plant operations.

Crowley, Barbara

1991-01-01T23:59:59.000Z

299

141111111111111111 Federal Energy Regulatory Commission  

E-Print Network (OSTI)

347) requires federal agencies to annually report their security and privacy programs. The Office of Management and Budget (OMB) provides instructions on complying with the requirements of FISMA. On July 17, 2006, OMB issued a memorandum for heads of executive departments and agencies, M-06-20, FY 2006 Reporting Instructions for the Federal Information Security Management Act and Agency Privacy Management requiring each agency to determine continued compliance with its public websites posted privacy policy. To that end, FERC will compare its information collection practices on its website with its posted FERC website privacy policy annually to ensure compliance with its stated website privacy policy. 2.0 PURPOSE The purpose of this document is to establish FERC policy and procedures on auditing its compliance with its posted website privacy policy.

unknown authors

2008-01-01T23:59:59.000Z

300

Energy- and water-development appropriations for Fiscal Year 1982. Hearings before the Committee on Appropriations, United States Senate, Ninety-Seventh Congress, First Session on H. R. 4144, an act making appropriations for energy and water development for the fiscal year ending September 30, 1982, and for other purposes. Part 2 (pages 679-1574). Department of Energy, Federal Energy Regulatory Commission, Nuclear Regulatory Commission, Tennessee Valley Authority  

SciTech Connect

Part 2 of the hearing record on appropriations for the fiscal year 1982 DOE budget for certain energy and water development programs opens with remarks by Energy Secretary James B. Edwards, who summarizes the Reagan energy policy of reducing federal participation in the funding and regulation of these projects and gives an overview of DOE programs. Subsequent hearings covered the Federal Power Marketing Administration; high-energy physics and basic energy science, and magnetic fusion; nuclear fission and uranium enrichment programs, conservation and renewable energy programs; departmental and related activities; Federal Energy Regulatory Commission and Nuclear Regulatory Commission, Tennessee Valley Authority, and national security and defense programs. The record covers nine days of hearings. (DCK)

1981-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Speakers: Howard K. Gruenspecht, EIA Shahid Chaudhry, California Energy Commission  

U.S. Energy Information Administration (EIA) Indexed Site

10: "The Energy-Water Nexus: Availability and Impacts" 10: "The Energy-Water Nexus: Availability and Impacts" Speakers: Howard K. Gruenspecht, EIA Shahid Chaudhry, California Energy Commission M. Michael Hightower, Sandia National Laboratories James Richenderfer, Susquehanna River Basin Commission Jeff C. Wright, Federal Energy Regulatory Commission [Note: Recorders did not pick up introduction of panel (see biographies for details on the panelists) or introduction of session.] Howard Gruenspecht: Okay, we're going to try to get underway here. We're still catching up on schedule from yesterday lunch, but I think we're making it back. Well, good morning, and welcome to the conference session on the Energy-Water Nexus. I'm Howard Gruenspecht, your moderator. Since it's going to be one of the last two

302

NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission  

E-Print Network (OSTI)

NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission 1416 9th Street, Room 1311 1516 9th Street, MS-2000 Sacramento, CA 95814 21080.5 and Title 20, California Code of Regulations, Section 1768 Project Name: Kern River Cogeneration

303

NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission  

E-Print Network (OSTI)

NOTICE OF DECISION BY THE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission 1416 9th Street, Room 1311 1516 9th Street, MS-2000 Sacramento, CA 95814 21080.5 and Title 20, California Code of Regulations, Section 1768 Project Name: Crockett Cogeneration

304

Natural Gas Outlook - Presented to: Kansas Corporation Commission  

Reports and Publications (EIA)

Presented to: Kansas Corporation Commission, October 28, 2003, Presented by: William Trapmann, Energy Information Administration

Information Center

2003-11-01T23:59:59.000Z

305

PEPCO - Commissioning and Operations Incentive Programs | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PEPCO - Commissioning and Operations Incentive Programs PEPCO - Commissioning and Operations Incentive Programs PEPCO - Commissioning and Operations Incentive Programs < Back Eligibility Commercial Construction Fed. Government Industrial Institutional Local Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Other Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Maximum Rebate Commissioning: 50% of cost Enhanced Commissioning: $20,000 Energy Savings Study Incentive: $20,000 All Incentives: $250,000/account/year for custom, prescriptive, commissioning and O&M Program Info State Maryland Program Type Utility Rebate Program Rebate Amount Retro-Commissioning: $12,000 or $0.06/sq. ft.

306

California State Lands Commission | Open Energy Information  

Open Energy Info (EERE)

Lands Commission Lands Commission Jump to: navigation, search Name California State Lands Commission Address 100 Howe Ave., Suite 100 South Place Sacramento, California Zip 95825-8282 Phone number 916-574-1900 Website http://www.slc.ca.gov/ Coordinates 38.5653989°, -121.4075812° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.5653989,"lon":-121.4075812,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

307

Illinois Commerce Commission | Open Energy Information  

Open Energy Info (EERE)

Commerce Commission Commerce Commission Jump to: navigation, search Name Illinois Commerce Commission Place Springfield, Illinois Zip 62701 Product Regulator of public utilities and transportation in Illinois. Coordinates 42.640925°, -88.413644° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.640925,"lon":-88.413644,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

308

Hutchinson Utilities Commission - Commercial Energy Efficiency Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hutchinson Utilities Commission - Commercial Energy Efficiency Hutchinson Utilities Commission - Commercial Energy Efficiency Program Hutchinson Utilities Commission - Commercial Energy Efficiency Program < Back Eligibility Commercial Fed. Government Local Government Nonprofit State Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Other Heat Pumps Commercial Lighting Lighting Manufacturing Maximum Rebate $2,000 Program Info State Minnesota Program Type Utility Rebate Program Rebate Amount Lighting: $300 per kW saved LED Exit Signs: $12 Occupancy Sensors: $20 - $40 Air Conditioning Systems: $20 - $40 per ton Air-Source Heat Pumps: $65 - $150 per ton Geothermal Heat Pumps: $150 per ton Chillers: $3,000 - $4,000, depending on size Chilled Water Resets: $350 - $900, depending on type and size

309

Utah Public Service Commission | Open Energy Information  

Open Energy Info (EERE)

Utah Public Service Commission Utah Public Service Commission Name Utah Public Service Commission Address 160 East 300 South Place Salt Lake City, Utah Zip 84114 Phone number 801.530.6716 Website http://www.psc.utah.gov/index. Coordinates 40.7627771°, -111.8866213° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.7627771,"lon":-111.8866213,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

310

California Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Public Utilities Commission Public Utilities Commission Address 505 Van Ness Avenue Place San Francisco, California Zip 94102 Phone number 415-703-2782 Website http://www.cpuc.ca.gov/puc/ References CPUC Website[1] This article is a stub. You can help OpenEI by expanding it. California Public Utilities Commission is an organization based in San Francisco, California. The CPUC regulates privately owned electric, natural gas, telecommunications, water, railroad, rail transit, and passenger transportation companies, in addition to authorizing video franchises. Our five Governor-appointed Commissioners, as well as our staff, are dedicated to ensuring that consumers have safe, reliable utility service at reasonable rates, protecting against fraud, and promoting the health of California's economy.

311

Example Retro-Commissioning Statement of Work  

NLE Websites -- All DOE Office Websites (Extended Search)

11.3 11.3 Example Retro-Cx Scope of Work Example Retro-Commissioning Scope of Work To Include Services As Part of Super ESPC Detailed Energy Survey Background Agency requests that ESCo perform retro-commissioning services 1 , as detailed herein, as a part of performing the Detailed Energy Survey (DES) for site. The incremental cost for these services will be covered as a part of the project development cost for the Super ESPC project, whether or not viable measures are identified and ultimately implemented. It is the intent of the Agency to expand the work that will be performed during the DES. Leveraging the DES to complete a thorough scoping of retro-commissioning opportunities will substantially enhance the value of the ESCO services by ensuring that

312

Michigan Public Service Commission | Open Energy Information  

Open Energy Info (EERE)

Commission Commission Jump to: navigation, search State Michigan Name Michigan Public Service Commission Address 6545 Mercantile Way, Suite 7 City, State Lansing, MI Zip 48911 Website http://www.michigan.gov/mpsc/ Coordinates 42.663692°, -84.535225° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.663692,"lon":-84.535225,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

313

Idaho Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Commission Commission Jump to: navigation, search Name Idaho Public Utilities Commission Address P.O. Box 83720 Place Boise, ID Zip 83720 Website http://www.puc.idaho.gov Coordinates 43.6175293°, -116.2003704° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.6175293,"lon":-116.2003704,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

314

Hawaii Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Public Utilities Commission Public Utilities Commission Jump to: navigation, search Name Hawaii Public Utility Commission Address 465 South King Street #103 Place Honolulu, Hawaii Zip 96813 Coordinates 21.3053513°, -157.85857° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":21.3053513,"lon":-157.85857,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

315

Oregon Public Utility Commission | Open Energy Information  

Open Energy Info (EERE)

Commission Commission Jump to: navigation, search Name Oregon Public Utility Commission Address 550 Capitol Street N.E. Suite 215 Place Salem, Oregon Zip 97301-2551 Number of employees 51-200 Phone number 503-373-7394 Website http://www.oregon.gov/PUC/Page Coordinates 44.941989°, -123.025697° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.941989,"lon":-123.025697,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

316

Using Building Control System for Commissioning  

E-Print Network (OSTI)

This paper summarizes the different approaches developed during Annex 40 (research project of International Energy Agency - Energy Conservation in Buildings & Community Systems ) for carrying out commissioning activities using the control system. During our work we have found that control systems in buildings have the potential to greatly improve the commissioning process. In particular, control systems can be used to carry out automated testing on the energy systems in a building in a systematic way. Technologies for carrying out automated commissioning are still in their infancy and very few tools are available for practitioners to use. However, our work has demonstrated that tools can be built using existing infrastructure at relatively low cost. In many cases, tools are software programs that can be implemented on most microprocessor-based platforms.

Vaezi-Nejad, H.; Salsbury, T.; Choiniere, D.

2004-01-01T23:59:59.000Z

317

Energy and water development appropriations for 1986. Part 6. Nuclear Regulatory Commission. Hearings before a Subcommittee of the Committee on Appropriations, House of Representatives, Ninety-Ninth Congress, First Session  

SciTech Connect

Part 6 of the hearing record covers testimony by Nunzio J. Palladino and other commissioners and directors of the Nuclear Regulatory Commission (NRC), who described how NRC is organized and how it operates in response to a survey and study of NRC operations prepared for the Committee on Appropriations. The witnesses responded to negative reports of distrust, fiscal inefficiency, ambiguity, and a failure to modify regulatory requirements to reflect new information. The witnesses disagreed that there has been any decline or compromise with plant safety, but agreed that the backfitting program needs better procedures. The volume includes the text of the report and both written comment and oral testimony before the committee.

1985-01-01T23:59:59.000Z

318

GRR/Section 7-CA-a - State Plant Commissioning Process, Application for  

Open Energy Info (EERE)

GRR/Section 7-CA-a - State Plant Commissioning Process, Application for GRR/Section 7-CA-a - State Plant Commissioning Process, Application for Certification < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-CA-a - State Plant Commissioning Process, Application for Certification 07CAAPlantCommissioningProcessApplicationForCertification.pdf Click to View Fullscreen Contact Agencies California Energy Commission Regulations & Policies Warren-Alquist Act California Code of Regulations, Title 20 - Public Utilities and Energy Triggers None specified Click "Edit With Form" above to add content 07CAAPlantCommissioningProcessApplicationForCertification.pdf 07CAAPlantCommissioningProcessApplicationForCertification.pdf Error creating thumbnail: Page number not in range.

319

Public Utility Commission in the year 2000  

Science Conference Proceedings (OSTI)

This article is about What is and What ought to be as we look to the institution of public utility commission regulation at the turn of the century. To signal my own view at the outset, I find the prospects somewhat worrisome in light of the nature and direction of much of the response to real and imaginary changes in the regulated sectors. I surely do not call for standing in place, but I strongly believe we should leave the place standing. The following items are discernable trends that will shape the PUC at the turn-of-the century: (1) dichotomy of customers into core and noncore groups, (2) unbundling and new service offerings with a menu of prices, (3) relaxed regulation and increased reliance on market solutions instead of command and control, (4) increased use of market-based pricing and incentive ratemaking, (5) large users seeking lowest-cost generation and supply services, (6) shift from old regulatory bargains regarding exclusive territorial franchises and assured recovery of costs and investments, (7) utility diversification, (8) increasing business risk for utilities, amd (9) uncertainty as to continued utility attention to social goals and a changing obligation to serve. For each of these, the author focuses on: (1) changing missions and roles of the PUC, (2) the strategies for achieving them, and (3) the implementation requirements that operationalize the strategies.

Jones, D.N.

1995-12-31T23:59:59.000Z

320

Commissioning of the ATLAS Pixel Detector  

E-Print Network (OSTI)

The ATLAS pixel detector is a high precision silicon tracking device located closest to the LHC interaction point. It belongs to the first generation of its kind in a hadron collider experiment. It will provide crucial pattern recognition information and will largely determine the ability of ATLAS to precisely track particle trajectories and find secondary vertices. It was the last detector to be installed in ATLAS in June 2007, has been fully connected and tested in-situ during spring and summer 2008. It is currently in a commissioning phase using cosmic-ray events. We present the highlights of the past and future commissioning activities of the ATLAS pixel system.

J. -F. Arguin; for the ATLAS Pixel Collaboration

2008-10-16T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

LHCb commissioning and readiness for first data  

E-Print Network (OSTI)

LHCb has been installed by spring 2008, followed by intensive testing and commissioning of the system in order to be ready for first data taking. Despite the horizontal geometry of the LHCb detector it was possible to collect over one million useful cosmic events that allowed a first time alignment of the sub-detectors. Moreover events from beam dumps during the LHC synchronisation tests provided very useful data for further time and spacial alignment of the detector. Here we present an overview of our commissioning activities, the current status and an outlook on the startup in 2009.

Helge Voss; for the LHCb Collaboration

2009-06-08T23:59:59.000Z

322

The Atomic Energy Commission By Alice Buck  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Atomic Energy Atomic Energy Commission By Alice Buck July 1983 U.S. Department of Energy Office of Management Office of the Executive Secretariat Office of History and Heritage Resources 1 Introduction Almost a year after World War II ended, Congress established the United States Atomic Energy Commission to foster and control the peacetime development of atomic science and technology. Reflecting America's postwar optimism, Congress declared that atomic energy should be employed not only in the Nation's defense, but also to promote world peace, improve the public welfare, and strengthen free competition in private

323

California Solar Initiative California Public Utilities Commission  

E-Print Network (OSTI)

California Solar Initiative California Public Utilities Commission Staff Progress Report January 2009 #12;2 California Solar Initiative CPUC Staff Progress Report - January 2009 The California Public progress on the California Solar Initiative, the country's largest solar incentive program. In January 2007

324

Methodologies for Determining Persistence of Commissioning Benefits  

E-Print Network (OSTI)

Studies on the persistence of commissioning benefits to date have used a variety of methods to evaluate this persistence. This paper proposes a consistent framework for describing and evaluating the persistence of commissioning benefits. It begins by splitting commissioning benefits into two broad categories: 1) benefits that inherently persist; and 2) benefits that may not persist. The study of persistence then considers only the benefits that may not persist. These benefits are critical, since the top five reasons cited for performing commissioning in both new buildings and existing buildings are benefits that may not persist. These benefits are then further divided into benefits that may be quantified and benefits that are generally difficult to quantify. This paper proposes that benefits that may be quantified should generally be evaluated for persistence using approaches that are already widely accepted and used for other purposes, with adaptations where needed. Specifically, it proposes that energy and water savings be evaluated using methods consistent with the International Performance Measurement and Verification Protocol (adapted with additional weather normalization), that comfort and indoor air quality improvements be evaluated using relevant standards, specifically ASHRAE Standard 55 and ASHRAE Standard 62, but goes further and proposes a methodology for economic quantification of these benefits as well. Finally, it is proposed that the persistence of measures whose benefit is difficult to quantify be evaluated simply by determining whether the measure is still in place or performing.

Claridge, D. E.

2006-01-01T23:59:59.000Z

325

Our Purpose and Direction Forestry Commission Wales  

E-Print Network (OSTI)

Corporate Our Purpose and Direction Forestry Commission Wales: Corporate Plan 2012 to 2015 #12;Ministers Foreword I am very pleased to be providing the foreword for `Our purpose and direction beyond the 50-year lifespan of Woodlands for Wales. Our Purpose and Direction John Griffiths AM Minister

326

California Energy Commission DRAFT STAFF REPORT  

E-Print Network (OSTI)

of the total energy they use, and California has a long history of leading the push to improve the energyCalifornia Energy Commission DRAFT STAFF REPORT ACHIEVING ENERGY SAVINGS IN CALIFORNIA BUILDINGS Saving Energy in Existing Buildings and Achieving a ZeroNetEnergy Future JULY 2011 CEC4002011007SD

327

Commissioning of the ATLAS Liquid Argon Calorimeters  

Science Conference Proceedings (OSTI)

A selection of ATLAS liquid argon (LAr) calorimeter commissioning studies is presented. It includes a coherent noise study, a measurement of the quality of the ionization pulse shape prediction, and energy and time reconstruction analyses with cosmic and single beam signals.

Cooke, Mark S. [Columbia University, New York, NY 10027 (United States)

2009-12-17T23:59:59.000Z

328

Distributed Energy System Validation, Commissioning and  

E-Print Network (OSTI)

Distributed Energy System Validation, Commissioning and Qualification Test Report Prepared Agreement No. DE-FC26-06NT42847 Hawai`i Distributed Energy Resource Technologies for Energy Security Subtask for the U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Under Cooperative

329

The California Energy Commission and Its Programs  

E-Print Network (OSTI)

supply of competitively priced energy. The state is a world leader in energy research and development energy supply/demand and keeping historical energy data. · Licensing and monitoring the constructionThe California Energy Commission and Its Programs A Public Information Guide Prepared by the Public

330

California Energy Commission Pipeline Integrity Technology  

E-Print Network (OSTI)

California Energy Commission Pipeline Integrity Technology Demonstration Grant California Energy Solicitation Scope · The purpose of this solicitation is to demonstrate natural gas pipeline inspection using low cost/low power sensors ­ Improvement of existing pipeline inspection technology to identify

331

California Energy Commission GUIDANCE ON WASTE  

E-Print Network (OSTI)

California Energy Commission GUIDANCE GUIDANCE ON WASTE MANAGEMENT PLANS FOR ENERGY EFFICIENCY passed upon the accuracy or adequacy of the information in this report. #12;GUIDANCE ON WASTE MANAGEMENT) obtain waste management plans for each proposed project receiving funding under the Energy Efficiency

332

Potential Benefits of Commissioning California Homes  

SciTech Connect

Commissioning California's houses can result in better performing systems and houses. In turn, this will result in more efficient use of energy, carbon emission reductions, and improved occupant comfort. In particular, commissioning houses can save a significant amount of HVAC-related energy (15 to 30% in existing houses, 10 to 20% in new conventional houses, and up to 8% in advanced energy efficiency houses). The process that we considered includes corrective measures that could be implemented together during construction or during a single site visit (e.g., air tightening, duct sealing, and refrigerant and air handler airflow corrections in a new or existing house). Taking advantage of additional, more complex opportunities (e.g., installing new windows in an existing house, replacing the heating and air conditioning system in a new or existing house) can result in additional HVAC-related energy savings (60 to 75% in existing houses, and 50 to 60% in new conventional houses). The commissioning-related system and house performance improvements and energy savings translate to additional benefits throughout California and beyond. By applying commissioning principles to their work, the building community (builders and contractors) benefit from reduced callbacks and lower warranty costs. HERS raters and inspectors will have access to an expanded market sector. As the commissioning process rectifies construction defects and code problems, building code officials benefit from better compliance with codes. The utilities benefit from reduced peak demand, which can translate into lower energy acquisition costs. As houses perform closer to expectations, governmental bodies (e.g., the California Energy Commission and the Air Resources Board) benefit from greater assurance that actual energy consumption and carbon emissions are closer to the levels mandated in codes and standards, resulting in better achievement of state energy conservation and environmental goals. California residents' quality of life is improved through better indoor environmental comfort and lower energy bills. Lower energy bills free up money for residents to spend on other needs or goals, such as additional education and health and welfare. With an expansion of existing industries and the development of new commissioning-related industries, related jobs and tax revenues will increase, further increasing the quality of life for California.

Matson, Nance; Wray, Craig; Walker, Iain; Sherman, Max

2002-01-01T23:59:59.000Z

333

Potential Benefits of Commissioning California Homes  

SciTech Connect

Commissioning California's houses can result in better performing systems and houses. In turn, this will result in more efficient use of energy, carbon emission reductions, and improved occupant comfort. In particular, commissioning houses can save a significant amount of HVAC-related energy (15 to 30% in existing houses, 10 to 20% in new conventional houses, and up to 8% in advanced energy efficiency houses). The process that we considered includes corrective measures that could be implemented together during construction or during a single site visit (e.g., air tightening, duct sealing, and refrigerant and air handler airflow corrections in a new or existing house). Taking advantage of additional, more complex opportunities (e.g., installing new windows in an existing house, replacing the heating and air conditioning system in a new or existing house) can result in additional HVAC-related energy savings (60 to 75% in existing houses, and 50 to 60% in new conventional houses). The commissioning-related system and house performance improvements and energy savings translate to additional benefits throughout California and beyond. By applying commissioning principles to their work, the building community (builders and contractors) benefit from reduced callbacks and lower warranty costs. HERS raters and inspectors will have access to an expanded market sector. As the commissioning process rectifies construction defects and code problems, building code officials benefit from better compliance with codes. The utilities benefit from reduced peak demand, which can translate into lower energy acquisition costs. As houses perform closer to expectations, governmental bodies (e.g., the California Energy Commission and the Air Resources Board) benefit from greater assurance that actual energy consumption and carbon emissions are closer to the levels mandated in codes and standards, resulting in better achievement of state energy conservation and environmental goals. California residents' quality of life is improved through better indoor environmental comfort and lower energy bills. Lower energy bills free up money for residents to spend on other needs or goals, such as additional education and health and welfare. With an expansion of existing industries and the development of new commissioning-related industries, related jobs and tax revenues will increase, further increasing the quality of life for California.

Matson, Nance; Wray, Craig; Walker, Iain; Sherman, Max

2002-01-01T23:59:59.000Z

334

STATE OF CALIFORNIA THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

Acting Secretary Federal Energy Regulatory Commission 888 First Street NE ­ Room 1A Washington, DC 20246STATE OF CALIFORNIA ­ THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA ENERGY COMMISSION 1516 NINTH STREET SACRAMENTO, CA 95814-5512 www.energy.ca.gov April 19, 2007 Ms. Philis Posey

335

On the calibration and commissioning of lighting controls  

SciTech Connect

Lighting controls have the potential to capture significant energy savings in commercial buildings if properly specified, installed, commissioned and maintained. Proper commissioning is often absent in lighting projects and the lack of commissioning can significantly reduce a project`s energy savings potential. The paper focuses on the importance of good commissioning practice for obtaining satisfactory performance from lighting control systems and discusses the difficulties of commissioning today`s systems. Some practical suggestions for commissioning lighting controls is offered as well as advice to specifiers and early adopters to aid them in selecting controls that are most appropriate to their requirements.

Rubinstein, F.; Avery, D.; Jennings, J. [Lawrence Berkeley National Lab., CA (United States). Environmental Energy Technologies Div.; Blanc, S. [Pacific Gas and Electric Co., San Ramon, CA (United States). Customer Energy Management Dept.

1997-10-01T23:59:59.000Z

336

Requirements for Commissioning HVAC Systems Using BEMS and Commissioning the BEMS Itself Based on Questionnaire Surveys  

E-Print Network (OSTI)

In this paper the present status and requirements for commissioning of HVAC Systems using Building Energy Management Systems (BEMS) and commissioning the BEMS itself are investigated and summarized. The information presented is based on the results of the questionnaire and interview survey of experts which was carried out in four countries; Japan, the USA, France and Canada. This paper intends to clarify the requirements and future scope of the above issues by analyzing similarities and differences between the countries.

Yoshida, H.; Vaezi-Nejad, H.; Choiniere, D.; Wang, F.

2004-01-01T23:59:59.000Z

337

GRR/Section 7-OR-d - Expedited Plant Commissioning Process | Open Energy  

Open Energy Info (EERE)

7-OR-d - Expedited Plant Commissioning Process 7-OR-d - Expedited Plant Commissioning Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-OR-d - Expedited Plant Commissioning Process 07ORDExpeditedPlantCommissioningProcess.pdf Click to View Fullscreen Contact Agencies Oregon Department of Energy Regulations & Policies Revised Statute 469 Oregon Administrative Rules 345-015 Triggers None specified Click "Edit With Form" above to add content 07ORDExpeditedPlantCommissioningProcess.pdf 07ORDExpeditedPlantCommissioningProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Power Plants with an average electric generating capacity of less than 100

338

GRR/Section 7-CA-b - State Plant Commissioning Process, Small Power Plant  

Open Energy Info (EERE)

7-CA-b - State Plant Commissioning Process, Small Power Plant 7-CA-b - State Plant Commissioning Process, Small Power Plant Exception < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-CA-b - State Plant Commissioning Process, Small Power Plant Exception 07CABPlantCommissioningProcessSmallPowerPlantExemption.pdf Click to View Fullscreen Contact Agencies California Energy Commission Regulations & Policies California Code of Regulations, Title 20 - Public Utilities and Energy Triggers None specified Click "Edit With Form" above to add content 07CABPlantCommissioningProcessSmallPowerPlantExemption.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

339

GRR/Section 7-UT-c - Utah Public Service Commission | Open Energy  

Open Energy Info (EERE)

7-UT-c - Utah Public Service Commission 7-UT-c - Utah Public Service Commission < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-UT-c - Utah Public Service Commission 07UTCUtahPublicServiceCommissionProcess.pdf Click to View Fullscreen Contact Agencies Utah Public Service Commission Regulations & Policies Utah Code Title 54 Public Utilities Utah Code 11-13-304 Certificate of public convenience and necessity required --Exceptions Triggers None specified Click "Edit With Form" above to add content 07UTCUtahPublicServiceCommissionProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

340

H. R. 1711: a Bill to authorize appropriations for the Nuclear Regulatory Commission for fiscal year 1986 and fiscal year 1987. Introduced in the House of Representatives, Ninety-Ninth Congress, First Session  

SciTech Connect

Nuclear Regulatory Commission (NRC) appropriations for fiscal years 1986 and 1987 are $429 million and $460 million, respectively. The Bill allocates sums for each year for reactor regulation, inspection and enforcement, nuclear material safety and safeguards, reactor research, program technical support, and program administration. The Bill cites conditions for spending the funds and for entering into grants and cooperative agreements. The NRC is authorized to issue reactor operating licenses in the absence of a state or local emergency preparedness plan if it determines that public safety is assured.

1985-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

California Coastal Commission | Open Energy Information  

Open Energy Info (EERE)

Logo: California Coastal Commission Name California Coastal Commission Address 45 Fremont Street, Suite 2000 Place San Francisco, California Zip 94105-2219 Phone number 415-904-5400 Website http://www.coastal.ca.gov/ Coordinates 37.7912419°, -122.397133° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.7912419,"lon":-122.397133,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

342

Automatic Commissioning of Multiple VAV Terminals  

E-Print Network (OSTI)

A site survey on a modern operating commercial building screened 261 ineffective VAV (Variable Air Volume) boxes (20.9% of the total boxes in the building) and summarized ten typical faults for VAV air-conditioning system(s) resulting in energy waste, performance degradation or totally out of control. A strategy is developed to automatically check the health condition of VAV terminals and diagnose the faults. Hybrid approach is employed to establish a commissioning and re-commissioning tool of VAV air-conditioning system. Performance indices with expert rules based on system physical characteristics are adopted to detect and diagnose the nine of the ten faults. PCA (Principal Component Analysis) method is developed to detect and diagnose the VAV box flow sensor bias (Fault 10) and to reconstruct the faulty sensors. A multiple VAV fault FDD strategy for a VAV entire system is developed, which is validated in simulation and filed tests.

Qin, J.; Wang, S.

2004-01-01T23:59:59.000Z

343

Blue Ribbon Commission on America's Nuclear Future  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Blue Ribbon Commission on America's Nuclear Future Blue Ribbon Commission on America's Nuclear Future Agenda March 25 - 26, 2010 Willard Intercontinental Hotel, Washington, DC Thursday, March 25, 2010 Open Meeting - Grand Ballroom 11:00 a.m. Open meeting/review agenda Tim Frazier 11:10 a.m. Opening comments from Secretary Chu 11:25 a.m. Opening discussion - Co-chairs Honorable Lee Hamilton General Brent Scowcroft 11:35 a.m. Opening discussion - members Honorable Pete Domenici Honorable Chuck Hagel Honorable Phil Sharp Mr. Mark H. Ayers Honorable Vicky Bailey Dr. Albert Carnesale Ms. Susan Eisenhower Mr. Jonathan Lash Dr. Allison Macfarlane Dr. Richard A. Meserve Dr. Ernie Moniz Mr. John Rowe Dr. Per F. Peterson 12:30 p.m. Lunch

344

Colorado Public Utilities Commission | Open Energy Information  

Open Energy Info (EERE)

Public Utilities Commission Public Utilities Commission Address 1560 Broadway, Suite 250 Place Denver, Colorado Zip 80202 Phone number (303) 894-2000 Coordinates 39.7415017°, -104.9866578° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.7415017,"lon":-104.9866578,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

345

California Energy Commission | Open Energy Information  

Open Energy Info (EERE)

Energy Commission Energy Commission Address 1516 Ninth Street, MS-29 Place Sacramento, CA Zip 95814-5512 Website http://www.energy.ca.gov Coordinates 40.97989806962°, -94.21875° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.97989806962,"lon":-94.21875,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

346

Railroad Commission of Texas | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search Logo: Railroad Commission of Texas Name Railroad Commission of Texas Address 1701 N. Congress Place Austin, Texas Zip 78701 Year founded 1891 Phone number (512) 463-7158 Website http://www.rrc.state.tx.us/ Coordinates 30.2790636°, -97.7382267° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.2790636,"lon":-97.7382267,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

347

Oregon Environmental Quality Commission | Open Energy Information  

Open Energy Info (EERE)

Oregon Environmental Quality Commission Oregon Environmental Quality Commission Address 811 SW 6th Avenue Place Portland, Oregon Zip 97204-1390 Phone number 503-229-5301 Website http://www.oregon.gov/DEQ/EQC/ Coordinates 45.5182053°, -122.6790735° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.5182053,"lon":-122.6790735,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

348

A History of the Atomic Energy Commission  

SciTech Connect

This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations.

Buck, A.L.

1983-07-01T23:59:59.000Z

349

Colorado Public Utility Commission's Xcel Wind Decision  

DOE Green Energy (OSTI)

In early 2001 the Colorado Public Utility Commission ordered Xcel Energy to undertake good faith negotiations for a wind plant as part of the utility's integrated resource plan. This paper summarizes the key points of the PUC decision, which addressed the wind plant's projected impact on generation cost and ancillary services. The PUC concluded that the wind plant would cost less than new gas-fired generation under reasonable gas cost projections.

Lehr, R. L. (NRUC/NWCC); Nielsen, J. (Land and Water Fund of the Rockies); Andrews, S.; Milligan, M. (National Renewable Energy Laboratory)

2001-09-20T23:59:59.000Z

350

International Electrotechnical Commission IEC 61850 Substation Development  

Science Conference Proceedings (OSTI)

The International Electrotechnical Commission Standard IEC 61580 is an emerging standard for advanced utility automation that provides a rich, hierarchical data and behavior model for use in sophisticated substation control and protection equipment. One of the important features introduced by IEC 61850 is the replacement of the wires used to exchange binary and analog information between Intelligent Electronic Devices (IEDs) with communication messages. In a conventional substation, the substation engine...

2009-03-25T23:59:59.000Z

351

Commissioning and Calibration of the ALICE TPC  

E-Print Network (OSTI)

ALICE (A Large Ion Collider Experiment) is the dedicated heavy ion experiment at the Large Hadron Collider at CERN. The main tracking device of ALICE is a large volume TPC. The milestones of the TPC commissioning as well as the current status of the detector calibration are presented. The obtained resolutions in transverse momentum, position as well as in specific energy loss (dE/dx) are presented and results from noise and electron drift velocity measurements are addressed.

J. Wiechula; for the ALICE TPC Collaboration

2009-07-24T23:59:59.000Z

352

Delmarva - Commissioning and Operations Incentive Programs | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delmarva - Commissioning and Operations Incentive Programs Delmarva - Commissioning and Operations Incentive Programs Delmarva - Commissioning and Operations Incentive Programs < Back Eligibility Commercial Construction Fed. Government Industrial Institutional Local Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Other Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Maximum Rebate Retro-Commissioning: $30,000 Commissioning: 50% of cost Enhanced Commissioning: 20,000 All Incentives: 250,000/account/year and 500,000/customer for custom, prescriptive, commissioning and OandM Program Info State Maryland Program Type Utility Rebate Program Rebate Amount Retro-Commissioning: $0.02/sq ft or $4,000 (Development); $0.06/sq ft or

353

Colorado Oil and Gas Commission - Production Data (Jan - Mar...  

Open Energy Info (EERE)

Colorado Oil and Gas Commission - Production Data (Jan - Mar 2011) The Colorado Oil and Gas Commission is the place where Colorado oil, gas, and geothermal data is stored and made...

354

Ex Parte Meeting between DOE and California Energy Commission...  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE and California Energy Commission Docket No EERE2008BTSTD0005 RIN 1904AB57 Ex Parte Meeting between DOE and California Energy Commission Docket No EERE2008BTSTD0005 RIN 1904AB57...

355

Ohio River Valley Water Sanitation Commission (Multiple States)  

Energy.gov (U.S. Department of Energy (DOE))

The Ohio River Valley Water Sanitation Commission (ORSANCO), was established on June 30, 1948 to control and abate pollution in the Ohio River Basin. ORSANCO is an interstate commission...

356

Roanoke River Basin Bi-State Commission (Multiple States)  

Energy.gov (U.S. Department of Energy (DOE))

The Roanoke River Basin Bi-State Commission was established as a bi-state commission composed of members from the Commonwealth of Virginia and the State of North Carolina.The purpose of the...

357

Ex parte communication of the California Energy Commission- Docket...  

NLE Websites -- All DOE Office Websites (Extended Search)

communication of the California Energy Commission- Docket No. EERE-2008-BT-STD-0005 Ex parte communication of the California Energy Commission- Docket No. EERE-2008-BT-STD-0005 On...

358

Report of the State of Nevada Commission on Nuclear Projects  

SciTech Connect

This third biennial Report of the Nevada Commission on Nuclear Projects has been prepared in fulfillment of the requirements of NRS 459.0092, which stipulates that the Commission shall report to the Governor and Legislature on any matter relating to radioactive waste disposal the Commission deems appropriate and advise and make recommendations on the policy of the State concerning nuclear waste disposal projects. Chapter One of the Report presents a brief overview of the Commission`s functions and statutory charges. It also contains a summary of developments which have affected the overall nuclear waste disposl issue since the last Commission Report was published in November, 1988. Chapter Two contains a synthesis of Commission activities and reports on the findings of the Commission relative to the geotechnical, environmental, socioeconomic, transportation, intergovernmental and legal aspects of federal and State nuclear waste program efforts.

1990-12-01T23:59:59.000Z

359

Design, Commissioning and Operational Aspects of a Novel Oxalate ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2013 TMS Annual Meeting & Exhibition. Symposium , Alumina and Bauxite. Presentation Title, Design, Commissioning and...

360

Preliminary State-of-the-Art Review for Commissioning Low ...  

Science Conference Proceedings (OSTI)

... a literature review of commissioning and operational experience with existing buildings that were designed to have low energy consumption. ...

2008-02-14T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Practical Diagnostics for Evaluating Residential Commissioning Metrics  

SciTech Connect

In this report, we identify and describe 24 practical diagnostics that are ready now to evaluate residential commissioning metrics, and that we expect to include in the commissioning guide. Our discussion in the main body of this report is limited to existing diagnostics in areas of particular concern with significant interactions: envelope and HVAC systems. These areas include insulation quality, windows, airtightness, envelope moisture, fan and duct system airflows, duct leakage, cooling equipment charge, and combustion appliance backdrafting with spillage. Appendix C describes the 83 other diagnostics that we have examined in the course of this project, but that are not ready or are inappropriate for residential commissioning. Combined with Appendix B, Table 1 in the main body of the report summarizes the advantages and disadvantages of all 107 diagnostics. We first describe what residential commissioning is, its characteristic elements, and how one might structure its process. Our intent in this discussion is to formulate and clarify these issues, but is largely preliminary because such a practice does not yet exist. Subsequent sections of the report describe metrics one can use in residential commissioning, along with the consolidated set of 24 practical diagnostics that the building industry can use now to evaluate them. Where possible, we also discuss the accuracy and usability of diagnostics, based on recent laboratory work and field studies by LBNL staff and others in more than 100 houses. These studies concentrate on evaluating diagnostics in the following four areas: the DeltaQ duct leakage test, air-handler airflow tests, supply and return grille airflow tests, and refrigerant charge tests. Appendix A describes those efforts in detail. In addition, where possible, we identify the costs to purchase diagnostic equipment and the amount of time required to conduct the diagnostics. Table 1 summarizes these data. Individual equipment costs for the 24 practical diagnostics range from a few hundred dollars to many thousands of dollars. The higher costs are associated with infrared thermography and state-of-the-art automated diagnostic systems. Most tests can be performed in one hour or less, using equipment priced toward the lower end of the cost spectrum.

Wray, Craig; Walker, Iain; Siegel, Jeff; Sherman, Max

2002-06-11T23:59:59.000Z

362

THE NATIONAL COMMISSION ON ENERGY POLICY December 2004  

E-Print Network (OSTI)

THE NATIONAL COMMISSION ON ENERGY POLICY December 2004 ENDING THE ENERGY STALEMATE A Bipartisan THE NATIONAL COMMISSION ON ENERGY POLICY December 2004 www.energycommission.org #12;PREAMBLE This report. ACKNOWLEDGEMENTS The National Commission on Energy Policy was founded in 2002 by the William and Flora Hewlett

Laughlin, Robert B.

363

California Energy Commission Technical Assistance for the Alternative and  

E-Print Network (OSTI)

California Energy Commission 1 Technical Assistance for the Alternative and Renewable Fuel and Vehicle Technology (ARFVT) Program California Energy Commission Request for Proposals RFP # 600-12-604 Pre-Bid Conference Date: January 23, 2013 #12;California Energy Commission AGENDA 10:00 Welcome and Introductions

364

European Commission Air pollution research report No 81  

E-Print Network (OSTI)

the European Commission nor any person acting on behalf of the Commission is responsible for the use which to the authors, the reviewers, the editorial board and the editor for their hard work in preparing this report. I General European Commission #12;#12;CONTENTS Pages PREFACE 3 CONTENTS 5 EDITORS, AUTHORS AND REVIEWERS 9

365

Commissioning of the SNS front-end systems at Berkeley Lab  

E-Print Network (OSTI)

COMMISSIONING OF THE SNS FRONT-END SYSTEMS AT BERKELEY LAB*Details of other MEBT commissioning efforts, especiallywere provided by LANL. Commissioning topics included beam

2002-01-01T23:59:59.000Z

366

Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions  

E-Print Network (OSTI)

Case Study: Supermarket Commissioning with an Emphasis onNational Conference on Building Commissioning, May 18-20,Building Enclosure Commissioning: What's the Big Deal?"

Mills, Evan

2010-01-01T23:59:59.000Z

367

Advanced Design and Commissioning Tools for Energy-Efficient Building Technologies  

E-Print Network (OSTI)

pp. 728733. Chapter 2: Commissioning guidelines for UFAD2.0 To accomplish commissioning of UFAD system, specificprocedure for use by commissioning agents and other building

Bauman, Fred; Webster, Tom; Zhang, Hui; Arens, Ed

2012-01-01T23:59:59.000Z

368

Design and Commissioning Plan for a Laser Heater for FERMI@elettra  

E-Print Network (OSTI)

F TN-08/13 Design and Commissioning Plan for a Laser Heateroperational guidelines for commissioning. Disclaimer Thisto be important for commissioning and for emittance

Zholents, Alexander A.

2008-01-01T23:59:59.000Z

369

Salsbury and Diamond: Automated Testing of HVAC Systems for Commissioning -1 -Automated Testing of HVAC Systems for Commissioning  

E-Print Network (OSTI)

and Diamond: Automated Testing of HVAC Systems for Commissioning - 1 - Automated Testing of HVAC Systems This paper describes an approach to the automation of the commissioning of HVAC systems. The approach of many HVAC systems is limited more by poor installation, commissioning, and maintenance than by poor

370

Rappahannock River Basin Commission (Virginia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rappahannock River Basin Commission (Virginia) Rappahannock River Basin Commission (Virginia) Rappahannock River Basin Commission (Virginia) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Virginia Program Type Siting and Permitting Provider Rappahannock River Basin Commission The Rappahannock River Basin Commission is an independent local entity

371

Public Service Commission Authorization to Utilize an Alternative Method of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Public Service Commission Authorization to Utilize an Alternative Public Service Commission Authorization to Utilize an Alternative Method of Cost Recovery for Certain Base Load Generation (Mississippi) Public Service Commission Authorization to Utilize an Alternative Method of Cost Recovery for Certain Base Load Generation (Mississippi) < Back Eligibility Commercial Construction Developer Fuel Distributor General Public/Consumer Industrial Installer/Contractor Investor-Owned Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Program Info State Mississippi Program Type Green Power Purchasing Industry Recruitment/Support Performance-Based Incentive Public Benefits Fund Provider Public Service Commission The Senate Bill 2793 authorizes the Public Service Commission (PSC) to

372

Interstate Commission on the Potomac River Basin (Multiple States) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interstate Commission on the Potomac River Basin (Multiple States) Interstate Commission on the Potomac River Basin (Multiple States) Interstate Commission on the Potomac River Basin (Multiple States) < Back Eligibility Commercial Construction Industrial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Systems Integrator Tribal Government Utility Savings Category Water Buying & Making Electricity Home Weatherization Program Info State District of Columbia Program Type Environmental Regulations Siting and Permitting Provider Interstate Commission on the Potomac River Basin The Interstate Commission on the Potomac River Basin's (ICPRB) mission is to enhance, protect, and conserve the water and associated land resources of the Potomac River and its tributaries through regional and interstate

373

The ATLAS Trigger System Commissioning and Performance  

E-Print Network (OSTI)

The ATLAS trigger has been used very successfully to collect collision data during 2009 and 2010 LHC running at centre of mass energies of 900 GeV, 2.36 TeV, and 7 TeV. This paper presents the ongoing work to commission the ATLAS trigger with proton collisions, including an overview of the performance of the trigger based on extensive online running. We describe how the trigger has evolved with increasing LHC luminosity and give a brief overview of plans for forthcoming LHC running.

A. Hamilton

2010-09-30T23:59:59.000Z

374

Status and Commissioning of the CMS Experiment  

E-Print Network (OSTI)

After a brief overview of the Compact Muon Solenoid (CMS) experiment, the status of construction and installation is described in the first part of the note. The second part of the document is devoted to a discussion of the general commissioning strategy of the CMS experiment, with a particular emphasis on trigger, calibration and alignment. Aspects of b-physics, as well as examples for early physics with CMS are also presented. CMS will be ready for data taking in time for the first collisions in the Large Hadron Collider (LHC) at CERN in late 2007.

O. Buchmueller; F. -P. Schilling

2007-01-11T23:59:59.000Z

375

Commissioning of the ATLAS Liquid Argon Calorimeter  

E-Print Network (OSTI)

The in-situ commissioning of the ATLAS liquid argon calorimeter is taking place since three years. During this period, it has been fully tested by means of frequent calibration runs, and the analysis of the large cosmic muon data samples and of the few beam splash events that occurred on September 10th, 2008. This has allowed to obtain a stable set of calibration constants for the first collisions, and to measure the in-situ calorimeter performances that were found to be at the expected level.

S. Laplace

2010-05-17T23:59:59.000Z

376

Commissioning of SLAC SLD 45-Degree Chambers  

E-Print Network (OSTI)

The SLD experiment at the Stanford Linear Accelerator Center had a significant gap in its muon tracking coverage, provided by the Warm Iron Calorimeter. Supplemental planes of limited streamer tube chambers were added to improve the coverage in the vicinity of the gap at 0.65 commissioning of the forty-five degree chamber region of the SLAC SLD Warm Iron Calorimeter is presented. This task involved the completion of the forty-five degree chamber region geometry for the Warm Iron Calorimeter's fitter and swimmer and the changing of the way multiple scattering effects are treated in the fitter algorithm.

V. O. Eschenburg

2002-07-30T23:59:59.000Z

377

Commissioning of the ATLAS Muon Trigger Selection  

E-Print Network (OSTI)

The performance of the three-level ATLAS muon trigger as evaluated by using LHC data is presented. Events have been selected by using only the hardware-based Level-1 trigger in order to commission and to subsequently enable the (software-based) selections of the High Level Trigger. Studies aiming at selecting prompt muons from J/{\\psi} and at reducing non prompt muon contamination have been performed. A brief overview on how the muon triggers evolve with increasing luminosity is given.

Musto, Elisa

2010-01-01T23:59:59.000Z

378

Commissioning of the ATLAS Muon Trigger Selection  

E-Print Network (OSTI)

The performance of the three-level ATLAS muon trigger as evaluated by using LHC data is presented. Events have been selected by using only the hardware-based Level-1 trigger in order to commission and to subsequently enable the (software-based) selections of the High Level Trigger. Studies aiming at selecting prompt muons from J/{\\psi} and at reducing non prompt muon contamination have been performed. A brief overview on how the muon triggers evolve with increasing luminosity is given.

Elisa Musto

2010-09-30T23:59:59.000Z

379

Commissioning of the ATLAS pixel detector  

SciTech Connect

The ATLAS pixel detector is a high precision silicon tracking device located closest to the LHC interaction point. It belongs to the first generation of its kind in a hadron collider experiment. It will provide crucial pattern recognition information and will largely determine the ability of ATLAS to precisely track particle trajectories and find secondary vertices. It was the last detector to be installed in ATLAS in June 2007, has been fully connected and tested in-situ during spring and summer 2008, and is ready for the imminent LHC turn-on. The highlights of the past and future commissioning activities of the ATLAS pixel system are presented.

ATLAS Collaboration; Golling, Tobias

2008-09-01T23:59:59.000Z

380

STATE OF CALIFORNIA THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

COMMISSION GUIDEBOOK RENEWABLE ENERGY PROGRAM OVERALL PROGRAM GUIDEBOOK Fourth Edition Commission Guidebook CALIFORNIA ENERGY COMMISSION Edmund G. Brown, Jr., Governor MAY 2012 CEC3002012003CMF #12;CALIFORNIA ENERGY COMMISSION ROBERT B. WEISENMILLER, PH.D. Chairman Commissioners KAREN

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Environmental externalities: A survey of state commission actions  

SciTech Connect

Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC`s Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a ``snapshot`` of regulatory developments in an area that is evolving rapidly. 16 refs.

Cohen, S.D.; Eto, J.H. [National Association of Regulatory Utility Commissioners, Washington, DC (United States); Goldman, C.A. [Lawrence Berkeley Lab., CA (United States); Beldock, J. [USDOE Assistant Secretary for Conservation and Renewable Energy, Washington, DC (United States). Office of Buildings and Community Systems; Crandall, G. [MSB Associates, Middleton, WI (United States)

1990-05-01T23:59:59.000Z

382

Environmental externalities: A survey of state commission actions  

Science Conference Proceedings (OSTI)

Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC's Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a snapshot'' of regulatory developments in an area that is evolving rapidly. 16 refs.

Cohen, S.D.; Eto, J.H. (National Association of Regulatory Utility Commissioners, Washington, DC (United States)); Goldman, C.A. (Lawrence Berkeley Lab., CA (United States)); Beldock, J. (USDOE Assistant Secretary for Conservation and Renewable Energy, Washington, DC (United States). Office of Buildings and Community Systems); Crandall, G. (MSB Associates, Middleton, WI (United States))

1990-05-01T23:59:59.000Z

383

GRR/Section 7-FD-b - Plant Commissioning Process | Open Energy Information  

Open Energy Info (EERE)

7-FD-b - Plant Commissioning Process 7-FD-b - Plant Commissioning Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-FD-b - Plant Commissioning Process 07FDBPlantCommissioning.pdf Click to View Fullscreen Contact Agencies Bureau of Land Management United States Forest Service Regulations & Policies Mineral Leasing Act of 1920 43 CFR 3200.4 43 CFR 3261.20 43 CFR 3274.10 43 CFR 3274.11 43 CFR 3274.13 43 CFR 3275.11 43 CFR 3275.12 Triggers None specified Click "Edit With Form" above to add content 07FDBPlantCommissioning.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Commercial operations from a Federal lease, a Federal unit, or a

384

GRR/Section 7-OR-b - State Plant Commissioning Process | Open Energy  

Open Energy Info (EERE)

7-OR-b - State Plant Commissioning Process 7-OR-b - State Plant Commissioning Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-OR-b - State Plant Commissioning Process 07ORBStatePlantCommissioningProcess (1).pdf Click to View Fullscreen Contact Agencies Oregon Department of Energy Regulations & Policies OAR 345-20-0011 Contents of a Notice of Intent OAR 345-015-0001 et seq Proceedings, including site certificate hearings Triggers None specified Click "Edit With Form" above to add content 07ORBStatePlantCommissioningProcess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

385

February 2008 In 2003, the California Public Utilities Commission, the California Energy Commission, and the California  

E-Print Network (OSTI)

prepared the update using the information and analysis prepared for the recent IEPR, as well as recent· Renewable energy· Electricity reliability and infrastructure· Electricity market structure· Natural gas#12;February 2008 In 2003, the California Public Utilities Commission, the California Energy

386

Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase  

Open Energy Info (EERE)

Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Agreement Abstract N/A Author U.S. Geothermal Inc. Published Publisher Not Provided, 2010 Report Number N/A DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Agreement Citation U.S. Geothermal Inc.. 2010. Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase Agreement. Boise Idaho: (!) . Report No.: N/A. Retrieved from "http://en.openei.org/w/index.php?title=Idaho_Public_Utilities_Commission_Approves_Neal_Hot_Springs_Power_Purchase_Agreement&oldid=682748"

387

Natural Gas Regulation - Delaware Public Service Commission (Delaware) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Natural Gas Regulation - Delaware Public Service Commission Natural Gas Regulation - Delaware Public Service Commission (Delaware) Natural Gas Regulation - Delaware Public Service Commission (Delaware) < Back Eligibility Utility Investor-Owned Utility State/Provincial Govt Industrial Municipal/Public Utility Local Government Fuel Distributor Program Info State Delaware Program Type Generating Facility Rate-Making Provider Delaware Public Service Commission The Delaware Public Service Commission regulates only the distribution of natural gas to Delaware consumers. The delivery and administrative costs associated with natural gas distribution are determined in base rate proceedings before the Commission. The recovery of costs associated with the natural gas used by customers is determined annually as part of fuel adjustment proceedings. As a result of this process, rates for natural gas

388

EFCOG Best Practice Submission - Guidance for Retro-Commissioning  

Science Conference Proceedings (OSTI)

Commissioning is slowly becoming an accepted quality method for ensuring that buildings are designed, constructed, and operated as required by the building owner and as intended by the original design. Retro-commissioning is a process, using commissioning concepts, to ensure that existing buildings are operated and maintained as required by the owner to meet the buildings current mission. Retro-commissioning further seeks to incorporate new equipment and operating practices to upgrade existing facilities to obtain increased efficiency and employee comfort and productivity. Retro-commissioning practices are not universal. Best practices have been identified to assist Federal organizations with the development of retro-commissioning programs and to help DOE sites to begin this quality related process.

Ernest L. Fossum, CEM

2006-01-01T23:59:59.000Z

389

Notices Safety Commission, 4330 East West  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Federal Register 0 Federal Register / Vol. 77, No. 8 / Thursday, January 12, 2012 / Notices Safety Commission, 4330 East West Highway, Bethesda, MD 20814, (301) 504-7923. Dated: January 10, 2012. Todd A Stevenson, Secretary. [FR Doc. 2012-625 Filed 1-10-12; 4:15 pm] BILLING CODE 6355-01-P CORPORATION FOR NATIONAL AND COMMUNITY SERVICE Information Collection; Submission for OMB Review, Comment Request AGENCY: Corporation for National and Community Service. ACTION: Notice. SUMMARY: The Corporation for National and Community Service (the Corporation), has submitted a public information collection request (ICR) entitled Day of Service Project Promotion Tool for review and approval in accordance with the Paperwork Reduction Act of 1995, Public Law 104- 13, (44 U.S.C. chapter 35). Copies of this

390

FTC data analysis. [Federal Trade Commission  

SciTech Connect

Manufacturers of 5 major consumer products submitted energy efficiency and related data to the Federal Trade Commission during late 1979 and early 1980 in response to energy-efficiency labeling and representations requirements. This report documents an analysis of these data as conducted by Vitro Laboratories. Data were submitted on five products: furnaces, water heaters, room air conditioners, refrigerators and refrigerator-freezers, and freezers. The submittals include information on manufacturer model number, estimated annual energy cost or the energy-efficiency rating, the number of tests performed on each basic model, and the capacity of each appliance model. Pattern analyses on these variables are presented, but it is observed that few common patterns for the five products exist. The unique patterns for each product are discussed.

Not Available

1981-02-11T23:59:59.000Z

391

Delaware River Basin Commission (Multiple States) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Delaware River Basin Commission (Multiple States) Delaware River Basin Commission (Multiple States) Delaware River Basin Commission (Multiple States) < Back Eligibility Utility Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Tribal Government Systems Integrator Savings Category Water Buying & Making Electricity Home Weatherization Program Info Start Date 1961 State Delaware Program Type Environmental Regulations Siting and Permitting Provider Project Review Section The Delaware River Basin Commission (DRBC) is a federal-interstate compact government agency that was formed by concurrent legislation enacted in 1961 by the United States and the four basin states (Pennsylvania, New York, New

392

Lake George Park Commission: Stormwater Management (New York) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lake George Park Commission: Stormwater Management (New York) Lake George Park Commission: Stormwater Management (New York) Lake George Park Commission: Stormwater Management (New York) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Environmental Regulations Provider Lake George Park Commission

393

The International Heat Flow Commission | Open Energy Information  

Open Energy Info (EERE)

The International Heat Flow Commission The International Heat Flow Commission Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: The International Heat Flow Commission Details Activities (1) Areas (1) Regions (0) Abstract: Unavailable Author(s): A. E. Beck, V. Cermak Published: Geothermics, 1989 Document Number: Unavailable DOI: Unavailable Source: View Original Journal Article Data Acquisition-Manipulation (Beck & Cermak, 1989) Unspecified Retrieved from "http://en.openei.org/w/index.php?title=The_International_Heat_Flow_Commission&oldid=387748" Category: Reference Materials What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 1863774514

394

Alaska Oil and Gas Conservation Commission: February 2011 Drilling...  

Open Energy Info (EERE)

Oil and Gas Conservation Commission: February 2011 Drilling & Permit Records This dataset contains oil and gas drilling and permit records for February 2011. State oil and gas...

395

Atomic Energy Commission Explores Peaceful Uses of Nuclear Explosions...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Explosions As part of the Plowshare program seeking to develop peaceful uses for nuclear explosives, the Atomic Energy Commission conducts the Sedan test at the Nevada...

396

Ohio River Greenway Development Commission (Indiana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ohio River Greenway Development Commission (Indiana) Ohio River Greenway Development Commission (Indiana) Ohio River Greenway Development Commission (Indiana) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Indiana Program Type Environmental Regulations Siting and Permitting Provider Ohio River Greenway Commission

397

River Basins Advisory Commissions (South Carolina) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River Basins Advisory Commissions (South Carolina) River Basins Advisory Commissions (South Carolina) River Basins Advisory Commissions (South Carolina) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State South Carolina Program Type Environmental Regulations Provider Catawba Wateree River Basin Advisory Commission

398

The Carnegie Commission and Council on Higher Education: A Retrospective  

E-Print Network (OSTI)

AND COUNCIL ON HIGHER EDUCATION: A RETROSPECTIVE * Novemberfor Studies in Higher Education, UC Berkeley Copyright 2005Carnegie Commission on Higher Education under the auspices

Douglass, John Aubrey

2005-01-01T23:59:59.000Z

399

Results and commissioning issues from an automated demand response pilot  

E-Print Network (OSTI)

of Fully Automated Demand Response in Large Facilities"Management and Demand Response in Commercial Buildings", L Band Commissioning Issues from an Automated Demand Response.

Piette, Mary Ann; Watson, Dave; Sezgen, Osman; Motegi, Naoya

2004-01-01T23:59:59.000Z

400

Hawaii Department of Land and Natural Resources Commission on...  

Open Energy Info (EERE)

icon Hawaii Department of Land and Natural Resources Commission on Water Resource Management Jump to: navigation, search Name Hawaii Department of Land and Natural Resources...

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Update on Blue Ribbon Commission for America's Nuclear Future...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

More Documents & Publications Summary Minutes of the Secretary of Energy Advisory Board Public Meeting on October 12, 2011 Blue Ribbon Commission on...

402

Idaho Public Utilities Commission Approves Neal Hot Springs Power...  

Open Energy Info (EERE)

Number NA DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Idaho Public Utilities Commission Approves Neal Hot Springs Power Purchase...

403

Design and Commissioning of the Outotec Ausmelt TSL Copper ...  

Science Conference Proceedings (OSTI)

Presentation Title, Design and Commissioning of the Outotec Ausmelt TSL Copper Smelter at DNMC. Author(s), Chuanzhuan Liu, Baizhi Chen, Jun Wan,...

404

Commissioning and Optimisation of the New Lead and Silver ... - TMS  

Science Conference Proceedings (OSTI)

Aug 1, 2000 ... Commissioning and Optimisation of the New Lead and Silver Refinery at the Pasminco Port Pirie Smelter by P. Kapoulitsas, M. Giunti,...

405

Design and Commissioning of the Ausmelt TSL Lead Smelter at ...  

Science Conference Proceedings (OSTI)

Presentation Title, Design and Commissioning of the Ausmelt TSL Lead Smelter at Yunnan Tin Company Limited. Author(s), Helin Gu, Xingcheng Song, Xu Lan,...

406

Commissioning of a Vertical Direct Chill Caster for Producti  

Science Conference Proceedings (OSTI)

Aug 1, 2003 ... Commissioning of a Vertical Direct Chill Caster for Producti by J. Grandfield, C-C. Young, K. Oswald, and P. Baker...

407

Commissioning: A Highly Cost-Effective Building Energy Management Strategy  

SciTech Connect

Quality assurance and optimization are essential elements of any serious technological endeavor, including efforts to improve energy efficiency. Commissioning is an important tool in this respect. The aim of commissioning new buildings is to ensure that they deliver-if not exceed-the performance and energy savings promised by their design. When applied to existing buildings, one-time or repeated commissioning (often called retrocommissioning) identifies the almost inevitable drift in energy performance and puts the building back on course, often surpassing the original design intent. In both contexts, commissioning is a systematic, forensic approach to improving performance, rather than a discrete technology.

Mills, Evan

2011-01-06T23:59:59.000Z

408

Orlando Utilities Commission- Residential Solar Water Heater Rebate Program (Florida)  

Energy.gov (U.S. Department of Energy (DOE))

The Orlando Utilities Commission (OUC) offers residential electric customers a point-of-sale rebate of $1,000 for new solar water heating systems.

409

Accumulator Ring Commissioning Latest Step for Spallation Neutron...  

NLE Websites -- All DOE Office Websites (Extended Search)

Accumulator Ring Commissioning Latest Step for Spallation Neutron Source BNL SNS Homepage The following is from a press release issued by Oak Ridge National Laboratory. OAK RIDGE,...

410

South Dakota-Minnesota Boundary Waters Commission (Minnesota) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dakota-Minnesota Boundary Waters Commission (Minnesota) Dakota-Minnesota Boundary Waters Commission (Minnesota) South Dakota-Minnesota Boundary Waters Commission (Minnesota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Minnesota Program Type Environmental Regulations This section establishes an interstate commission to set standards for

411

South Dakota-Minnesota Boundary Waters Commission (South Dakota...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Field Sites Power Marketing Administration Other Agencies You are here Home Savings South Dakota-Minnesota Boundary Waters Commission (South Dakota) South Dakota-Minnesota...

412

UNITED STATES ATOMIC ENERGY COMMISSION NEVADA OPERATIONS OFFICE  

Office of Legacy Management (LM)

UNITED STATES ATOMIC ENERGY COMMISSION NEVADA OPERATIONS OFFICE . MASTER .r NVO-152 DECEMBER 1974 Las Vegas, Nevada i, SUMMARY RIEPORT , . I ' i (ENTALNEVADTESTAREA...

413

Procedures and Standards for Residential Ventilation System Commissioning:  

NLE Websites -- All DOE Office Websites (Extended Search)

Procedures and Standards for Residential Ventilation System Commissioning: Procedures and Standards for Residential Ventilation System Commissioning: An Annotated Bibliography Title Procedures and Standards for Residential Ventilation System Commissioning: An Annotated Bibliography Publication Type Report LBNL Report Number LBNL-6142E Year of Publication 2013 Authors J. Chris Stratton, and Craig P. Wray Keywords ASHRAE 62.2, commissioning, procedures, residential, standards, ventilation Abstract Beginning with the 2008 version of Title 24, new homes in California must comply with ANSI/ASHRAE Standard 62.2-2007 requirements for residential ventilation. Where installed, the limited data available indicate that mechanical ventilation systems do not always perform optimally or even as many codes and forecasts predict. Commissioning such systems when they are installed or during subsequent building retrofits is a step towards eliminating deficiencies and optimizing the tradeoff between energy use and acceptable IAQ. Work funded by the California Energy Commission about a decade ago at Berkeley Lab documented procedures for residential commissioning, but did not focus on ventilation systems. Since then, standards and approaches for commissioning ventilation systems have been an active area of work in Europe. This report describes our efforts to collect new literature on commissioning procedures and to identify information that can be used to support the future development of residential-ventilation-specific procedures and standards. We recommend that a standardized commissioning process and a commissioning guide for practitioners be developed, along with a combined energy and IAQ benefit assessment standard and tool, and a diagnostic guide for estimating continuous pollutant emission rates of concern in residences (including a database that lists emission test data for commercially-available labeled products).

414

California Energy Commission Assessment of Natural Gas Combined Cycle  

E-Print Network (OSTI)

California Energy Commission 1 Assessment of Natural Gas Combined Cycle Plants for Carbon Dioxide Capture and Storage in a Gas-Dominated Electricity Market California Energy Commission Request for Proposals RFP # 500-10-502 Pre-Bid Conference Date: Wednesday, November 3, 2010 #12;California Energy

415

Monitoring-based HVAC Commissioning of an Existing Office  

E-Print Network (OSTI)

LBNL-5940E Monitoring-based HVAC Commissioning of an Existing Office Building for Energy Efficiency thereof or The Regents of the University of California. #12;1 Monitoring-based HVAC Commissioning@lbl.gov, Tel: 1-510-486-4921 Abstract The performance of Heating, Ventilation and Air Conditioning (HVAC

416

California Energy Commission "We have the largest rooftop solar  

E-Print Network (OSTI)

solar system in the nation!" Matt Muniz, P.E. Energy Program Manager Alameda County "With the Energy Commission's Energy Efficiency Financing Program we installed our 1.18 MW solar project at Santa Rita JailLOW INTEREST RATE LOANS AVAILABLE NOW! California Energy Commission "We have the largest rooftop

417

Commissioning and Prospects for Early Physics with ALICE  

E-Print Network (OSTI)

The ALICE detector has been commissioned and is ready for taking data at the Large Hadron Collider. The first proton-proton collisions are expected in 2009. This contribution describes the current status of the detector, the results of the commissioning phase and its capabilities to contribute to the understanding of both pp and PbPb collisions

P. G. Kuijer

2009-07-29T23:59:59.000Z

418

A New Commissioning and Deployment Method for Wireless Sensor Networks  

Science Conference Proceedings (OSTI)

Sensor networks are deployed on various environments in order to collect sensing information in many cases. It is not easy to optimize program codes of all nodes due to the environmental variety of deployment of sensor networks. Therefore, commissioning ... Keywords: sensor network, commissioning, ZigBee, network deployment

Bong Wan Kim; Seong-Soon Joo

2009-10-01T23:59:59.000Z

419

Commissioning Of The MINER{nu}A Tracking Prototype  

Science Conference Proceedings (OSTI)

MINER{nu}A is a neutrino scattering experiment that uses the NuMI beamline at Fermilab. A Tracking Prototype was assembled, commissioned and tested at Fermilab before moving it into the NuMI beamline. A description of some of the main commissioning activities is presented here.

Castorena, J.; Felix, J.; Higuera, A.; Urrutia, Z. [Universidad De Guanajuato, Division De Ciencias E Ingenierias, Leon, Guanajuato (Mexico); Zavala, G. [Universidad De Guanajuato, DCEA, Guanajuato, Guanajuato (Mexico)

2009-12-17T23:59:59.000Z

420

California Energy Commission California Leadership on Land Use  

E-Print Network (OSTI)

California Energy Commission California Leadership on Land Use and Climate Change California Leadership on Land Use and Climate Change Panama Bartholomy Advisor to the Chairman California Energy Commission New Partners for Smart GrowthNew Partners for Smart Growth Washington, DCWashington, DC February 8

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

California Energy Commission www.energy.ca.gov  

E-Print Network (OSTI)

California Energy Commission www.energy.ca.gov TECHNICAL ASSISTANCE TO PUBLIC AGENCIES Request Program o Energy Partnership Technical Assistance Program o Energy Conservation Assistance Act (ECAA) Loan Program · RFQ Overview · How to Respond to this RFQ · Questions and Answers California Energy Commission

422

Energy Programs of the Texas Industrial Commission  

E-Print Network (OSTI)

The objectives of the Industrial Energy Conservation Program are to assist Texas industry in using energy more efficiently through seminars, workshops, technical information exchange and other supportive programs with the goal of conserving at least 283.81 trillion BTU's of industrial energy in 1980. As the primary consumer of Texas' energy (54% of total, industry is a major focal point of the state's energy conservation effort. Although industry's overall record of energy conservation is good, such a large consumer must receive serious attention in any plan aimed at improving the overall efficiency of energy use in the state. The Texas Industrial Commission has been designated lead agency of the industrial conservation effort, and as such, created the Energy Utilization Department in the Fall of 1977. The multi-faceted department has established programs to accomplish its mission including: The Energy Search Center, an information access point for Texas manufacturers; a series of technical workshops and seminars; an annual Industrial Energy Technology Conference; the coordination of a university program for the training of industrial energy auditors; and organizational assistance in the establishment of regional energy conservation groups. Although manufacturers are encouraged to utilize the programs, they are designed primarily for small or medium-sized industries and low-technology operations where the employment of an energy specialist is economically impractical.

Heare, J.; dePlante, L. E.

1979-01-01T23:59:59.000Z

423

Commissioning of the CMS High Level Trigger  

Science Conference Proceedings (OSTI)

The CMS experiment will collect data from the proton-proton collisions delivered by the Large Hadron Collider (LHC) at a centre-of-mass energy up to 14 TeV. The CMS trigger system is designed to cope with unprecedented luminosities and LHC bunch-crossing rates up to 40 MHz. The unique CMS trigger architecture only employs two trigger levels. The Level-1 trigger is implemented using custom electronics, while the High Level Trigger (HLT) is based on software algorithms running on a large cluster of commercial processors, the Event Filter Farm. We present the major functionalities of the CMS High Level Trigger system as of the starting of LHC beams operations in September 2008. The validation of the HLT system in the online environment with Monte Carlo simulated data and its commissioning during cosmic rays data taking campaigns are discussed in detail. We conclude with the description of the HLT operations with the first circulating LHC beams before the incident occurred the 19th September 2008.

Agostino, L.; /Cornell U., Phys. Dept.; Bauer, G.; /MIT, LNS; Beccati, B.; /CERN; Behrens, U.; /DESY; Berryhil, J.; Biery, K.; /Fermilab; Bose, T.; /Boston U.; Brett, A.; /Fermilab; Branson, J.; /UC, San Diego; Cano, E.; /CERN; Cheung, H.; /Fermilab /CERN /LLNL, Livermore /Minnesota U.

2009-08-01T23:59:59.000Z

424

The ATLAS Inner Detector commissioning and calibration  

E-Print Network (OSTI)

The ATLAS Inner Detector is a composite tracking system consisting of silicon pixels, silicon strips and straw tubes in a 2 T magnetic field. Its installation was completed in August 2008 and the detector took part in data- taking with single LHC beams and cosmic rays. The initial detector operation, hardware commissioning and in-situ calibrations are described. Tracking performance has been measured with 7.6 million cosmic-ray events, collected using a tracking trigger and reconstructed with modular pattern-recognition and fitting software. The intrinsic hit efficiency and tracking trigger efficiencies are close to 100%. Lorentz angle measurements for both electrons and holes, specific energy-loss calibration and transition radiation turn-on measurements have been performed. Different alignment techniques have been used to reconstruct the detector geometry. After the initial alignment, a transverse impact parameter resolution of 22.1+/-0.9 {\\mu}m and a relative momentum resolution {\\sigma}p/p = (4.83+/-0.16) \\times 10-4 GeV-1 \\times pT have been measured for high momentum tracks.

The ATLAS Collaboration

2010-04-29T23:59:59.000Z

425

HYTEST Phase I Facility Commissioning and Modeling  

DOE Green Energy (OSTI)

The purpose of this document is to report the first year accomplishments of two coordinated Laboratory Directed Research and Development (LDRD) projects that utilize a hybrid energy testing laboratory that couples various reactors to investigate system reactance behavior. This work is the first phase of a series of hybrid energy research and testing stations - referred to hereafter as HYTEST facilities that are planned for construction and operation at the Idaho National Laboratory (INL). A HYTEST Phase I facility was set up and commissioned in Bay 9 of the Bonneville County Technology Center (BCTC). The purpose of this facility is to utilize the hydrogen and oxygen that is produced by the High Temperature Steam Electrolysis test reactors operating in Bay 9 to support the investigation of kinetic phenomena and transient response of integrated reactor components. This facility provides a convenient scale for conducting scoping tests of new reaction concepts, materials performance, new instruments, and real-time data collection and manipulation for advance process controls. An enclosed reactor module was assembled and connected to a new ventilation system equipped with a variable-speed exhaust blower to mitigate hazardous gas exposures, as well as contract with hot surfaces. The module was equipped with a hydrogen gas pump and receiver tank to supply high quality hydrogen to chemical reactors located in the hood.

Lee P. Shunn; Richard D. Boardman; Shane J. Cherry; Craig G. Rieger

2009-09-01T23:59:59.000Z

426

Commissioning and Performance Diagnostics for HVAC Control Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning and Performance Diagnostics for HVAC Control Systems Commissioning and Performance Diagnostics for HVAC Control Systems Speaker(s): Ashish Singhal Date: December 20, 2006 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Philip Haves The presentation will focus on practical aspects of commissioning control loops in commercial HVAC systems and evaluating their routine performance. Simple and theoretically sound methods for diagnosing control performance will be presented that detect serious performance issues associated with control loops in modern buildings. The discussion will center on a new control loop commissioning tool that helps field personnel to quickly test, tune and troubleshoot control loops. In addition to the active tests for commissioning control loops, a suite of diagnostic algorithms are used in a

427

Sensor Suitcase for Small Commercial Building Retro-Commissioning Research  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sensor Suitcase for Small Commercial Sensor Suitcase for Small Commercial Building Retro-Commissioning Research Project Sensor Suitcase for Small Commercial Building Retro-Commissioning Research Project The U.S. Department of Energy (DOE) is currently conducting research into sensor systems for small commercial buildings. The proposed system will streamline the processes of collecting data from these buildings and processing the data to obtain highly targeted retro-commissioning (RCx) actions customized for each building. Project Description This project seeks to develop a sensor and analysis system to support monitor-based retro-commissioning of small commercial buildings. Basing commissioning on actual measurements of conditions and system performance in these buildings is challenging because small commercial buildings

428

Blue Ribbon Commission on America's Nuclear Future Charter | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Blue Ribbon Commission on America's Nuclear Future Charter Blue Ribbon Commission on America's Nuclear Future Charter Blue Ribbon Commission on America's Nuclear Future Charter March 2, 2010 - 12:00am Addthis The Secretary of Energy, acting at the direction of the President, is establishing the Commission to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle, including all alternatives for the storage, processing, and disposal of civilian and defense used nuclear fuel, high-level waste, and materials derived from nuclear activities. Specifically, the Commission will provide advice, evaluate alternatives, and make recommendations for a new plan to address these issues, including: Evaluation of existing fuel cycle technologies and R&D programs. Criteria for evaluation should include cost, safety, resource utilization

429

Comments of the District of Columbia Public Service Commission | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of the District of Columbia Public Service Commission of the District of Columbia Public Service Commission Comments of the District of Columbia Public Service Commission Docket No. EO-05-01: Pursuant to Order No. 202-06-1, issued by the Department of Energy ("DOE") in the above-captioned docket on February 17, 2006, the District of Columbia Public Service Commission ("DCPSC") hereby submits these Comments to provide the DOE and all interested parties with the information regarding the DCPSC's recent efforts to facilitate compliance with the DOE directives issued in this proceeding and to ensure that adequate supplies of electricity continue to exist to serve our Nation's capital. Comments of the District of Columbia Public Service Commission More Documents & Publications Preliminary Comments on Compliance Plan and Request for Clarification or,

430

Orlando Utilities Commission - Solar Programs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Orlando Utilities Commission - Solar Programs Orlando Utilities Commission - Solar Programs Orlando Utilities Commission - Solar Programs < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Maximum Rebate No maximum specified Program Info State Florida Program Type Performance-Based Incentive Rebate Amount Solar Thermal (Commercial): 0.03/kWh PV (Commercial and Residential): 0.05/kWh Provider Orlando Utilities Commission (OUC) The Orlando Utilities Commission (OUC), through its Solar Program, offers to purchase the environmental attributes or renewable energy credits (RECs) from customers who install a photovoltaic (PV) and/or solar thermal energy system on their property. Incentive payments are equal to $0.05 per killowatt-hour (kWh) for commercial and residential PV systems and

431

Colorado Oil and Gas Conservation Commission | Open Energy Information  

Open Energy Info (EERE)

Oil and Gas Conservation Commission Oil and Gas Conservation Commission Name Colorado Oil and Gas Conservation Commission Place Denver, Colorado References COGCC Website[1] This article is a stub. You can help OpenEI by expanding it. Colorado Oil and Gas Conservation Commission is an organization based in Denver, Colorado. The mission of the Colorado Oil and Gas Conservation Commission (COGCC) is to foster the responsible development of Colorado's oil and gas natural resources. Responsible development results in: The efficient exploration and production of oil and gas resources in a manner consistent with the protection of public health, safety and welfare The prevention of waste The protection of mineral owners' correlative rights The prevention and mitigation of adverse environmental impacts

432

Secretary Chu Announces Blue Ribbon Commission on America's Nuclear  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Blue Ribbon Commission on America's Blue Ribbon Commission on America's Nuclear Future Secretary Chu Announces Blue Ribbon Commission on America's Nuclear Future January 29, 2010 - 12:57pm Addthis As part of the Obama Administration's commitment to restarting America's nuclear industry, U.S. Secretary of Energy Steven Chu today announced the formation of a Blue Ribbon Commission on America's Nuclear Future to provide recommendations for developing a safe, long-term solution to managing the Nation's used nuclear fuel and nuclear waste. The Commission is being co-chaired by former Congressman Lee Hamilton and former National Security Advisor Brent Scowcroft. In light of the Administration's decision not to proceed with the Yucca Mountain nuclear waste repository, President Obama has directed Secretary

433

Energy Department and French Commission on Atomic Energy and Alternative  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department and French Commission on Atomic Energy and Energy Department and French Commission on Atomic Energy and Alternative Energies Sign New Research and Development Agreement Energy Department and French Commission on Atomic Energy and Alternative Energies Sign New Research and Development Agreement June 28, 2012 - 1:04pm Addthis Energy Department and French Commission on Atomic Energy and Alternative Energies Sign New Research and Development Agreement Washington, D.C. - On June 19, 2012, U.S. Energy Secretary Steven Chu and Dr. Bernard Bigot, Chairman of France's Commission on Atomic Energy and Alternative Energies (CEA), signed an agreement to help facilitate research and development (R&D) cooperation. The Agreement on Cooperation in Low-Carbon Energy Technologies will focus on a spectrum of advanced

434

Ontology Development for Low-Energy Building Embedded Commissioning  

E-Print Network (OSTI)

This paper presents the results of initial work in developing an ontology for improving information exchange and automation in building system commissioning practices. In our previous research dealing with the derivation of product models from building commissioning process models, we found that there is a need to categorize and classify information items, which are available in commissioning process descriptions. In addition, the relationship between these items should be clearly defined to establish a topological relationship between items necessary for specifying product models. Ontology development is the way to categorize and classify domain knowledge information and items into inter-related concepts. Ontology assembles information in the form of concept hierarchies (taxonomies), axioms, and semantic relationships, which allow natural language to be presented unambiguously. A glossary (a lower form of ontology) specific to building commissioning tasks was developed as a first step. In the second step, an ontology for use in commissioning software applications was developed.

Lee, K. J.; Akin, O.; Akinci, B.; Garrett, J.; Bushby, S.

2009-11-01T23:59:59.000Z

435

Secretary Chu Announces Blue Ribbon Commission on America's Nuclear Future  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Blue Ribbon Commission on America's Nuclear Blue Ribbon Commission on America's Nuclear Future Secretary Chu Announces Blue Ribbon Commission on America's Nuclear Future January 29, 2010 - 12:00am Addthis Washington, D.C. - As part of the Obama Administration's commitment to restarting America's nuclear industry, U.S. Secretary of Energy Steven Chu today announced the formation of a Blue Ribbon Commission on America's Nuclear Future to provide recommendations for developing a safe, long-term solution to managing the Nation's used nuclear fuel and nuclear waste. The Commission is being co-chaired by former Congressman Lee Hamilton and former National Security Advisor Brent Scowcroft. In light of the Administration's decision not to proceed with the Yucca Mountain nuclear waste repository, President Obama has directed Secretary

436

Emergency Petition and Complaint of the District of Columbia Public Service Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AND AND FEDERAL ENERGY REGULATORY COMMISSION Emergency Petition and Complaint of ) Docket No. EL05-145-000 District of Columbia Public Service ) Commission ) EMERGENCY PETITION AND COMPLAINT OF THE DISTRICT OF COLUMBIA PUBLIC SERVICE COMMISSION Pursuant to Sections 202(c), 207 and 309 of the Federal Power Act ("FPA"), 16 U.S.C. §§ 824a(c), 824f and 825h, the District of Columbia Public Service Commission ("DCPSC") hereby submits this Emergency Petition and Complaint to avert the impending shutdown of the Potomac River Generating Station power plant ("Potomac River Plant" or "Plant") owned and operated by Mirant Corporation and its public utility subsidiaries (collectively, "Mirant") in Alexandria, Virginia.

437

First Thoughts on Commissioning of the TESLA Compiled by P. Castro for the TESLA commissioning study group.  

E-Print Network (OSTI)

First Thoughts on Commissioning of the TESLA Collider Compiled by P. Castro for the TESLA commissioning study group. September 6, 2002 Abstract The TESLA collider[1] is a large scale project be included in the plans of the construction and installation work of the TESLA collider. A working group

438

NOTICE OF DECISION BY -rHE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission  

E-Print Network (OSTI)

NOTICE OF DECISION BY -rHE CALIFORNIA ENERGY COMMISSION To: California Resources Agency From: California Energy Commission 1416 9th Street, Room 1311 1516 9th Street, MS-2000 Sacramento, CA 95814 21080.5 and Title 20, California Code of Regulations, Section 1768 Project Name: Gilroy Cogen Project

439

Japanese Vision of Commissioning Process and Asian View  

E-Print Network (OSTI)

Building Services Commissioning Association, BSCA, has been established in Japan as an NPO in order to propagate the building commissioning, especially HVAC commissioning, process among building and building services construction and maintenance society in Japan. As most engineers have not been so happy as the minimum initial cost policy used to goes first without clear definition of performance on environmental quality and energy efficiency, commissioning concept, after seven years of discussions in SHASE and IEA/ECBCS/Annex-40 shadow committee and others, has become popular and recognized as one of the most important process to be introduced, if only building owners and public sectors concerning building construction, energy conservation and environmental preservation come to understand true value of it. In Hong Kong the Commissioning Center was established in 2002 affiliated with the Hong Kong Institute of Vocational Education and with from short to long term training programs how to propagate the process and bring up commissioning engineers. In Mainland China and Korea commissioning process is not well recognized yet except in a sense of performance diagnostics and fault detections.

Nakahara, N.

2004-01-01T23:59:59.000Z

440

Commissioning & Optimization of On-Site Renewable Energy Systems  

E-Print Network (OSTI)

Today, many electrical contractors and photovoltaic (PV) integrators engineer and install custom systems on a variety of existing and new construction. These systems are designed specifically to the building configurations and to required utility interconnection. Each system therefore becomes a unique challenge to design, install and commission. This paper will present a detailed review of pre-commissioning activities, followed by the formal commissioning and startup of PV systems. A step by step list of activities, including a review of compliance to the National Electrical Code, will be presented with examples from actual completed installations. Proper understanding and installation of these systems will ensure the safety of all personnel during the commissioning and subsequent operation by the end user. One of the often overlooked benefits of the commissioning is to include the client in the overall review of the system and provide an explanation of the rational for the design, installation and operation of the system. This is not a substitute for the final hand over of the system, but rather a way for the client to become knowledgeable with the completed project. Finally, the commissioning procedure provides a view into the operation and maintenance (O&M) of the completed project. The commissioning process therefore presents a safe and thorough procedure for the final testing and evaluation of the system prior to hand over to the client.

Gardner, J.C.

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network (OSTI)

CRT DC DSM EHV ESI FACTS FERC GIS HHI IEC IEPR IID IOU IPPEnergy Regulatory Commission (FERC), followed by Californiacase of municipal utilities). FERC authorizes tariffs for

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

442

Interstate Mining Compact Commission (multi-state) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » Interstate Mining Compact Commission (multi-state) Interstate Mining Compact Commission (multi-state) < Back Eligibility Commercial Construction Developer Industrial Investor-Owned Utility Local Government Municipal/Public Utility Rural Electric Cooperative Systems Integrator Tribal Government Utility Program Info Start Date 1970 State Alabama Program Type Safety and Operational Guidelines Siting and Permitting Provider Interstate Mining Compact Commission The Interstate Mining Compact is a multi-state governmental agency / organization that represents the natural resource and related environmental protection interests of its member states. Currently, 23 states are members to the compact, and 6 additional states are associate members. The compact

443

Orlando Utilities Commission - Residential Energy Efficiency Rebate Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Orlando Utilities Commission - Residential Energy Efficiency Rebate Orlando Utilities Commission - Residential Energy Efficiency Rebate Program Orlando Utilities Commission - Residential Energy Efficiency Rebate Program < Back Eligibility Residential Savings Category Home Weatherization Commercial Weatherization Sealing Your Home Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Ventilation Heat Pumps Insulation Design & Remodeling Water Heating Windows, Doors, & Skylights Maximum Rebate Energy Star Heat Pump Water Heater:$650 Duct Repair/Replacement: $160 Contact OUC for more information on maximum incentive levels Program Info State Florida Program Type Utility Rebate Program Rebate Amount Window Film or Solar Screen : $1/sq.ft. Energy Star Windows : $2/sq.ft. Cool Roof: $0.14/sq. ft.

444

Getting Ready for Physics - Commissioning of the ALICE Experiment  

E-Print Network (OSTI)

ALICE at CERN-LHC is an experiment dedicated to the study of high-energy heavy-ion collision. In this paper we will briefly describe the experimental layout and give an overview on the installation status of the ALICE detector components including an outlook towards the completion of the staged detector setup. We will review the commissioning of the detector components with emphasis on the central detectors, in particular the time projection chamber (TPC). The commissioning took place in summer 2008 awaiting the first beams from the LHC in the fall. The result from commissioning are compared with the performance figures, which are outlined in the ALICE Physics Performance Reports.

H. R. Schmidt; for the ALICE Experiment

2009-05-27T23:59:59.000Z

445

Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 2. Evaluation of seismic designs: a review of seismic design requirements for Nuclear Power Plant Piping  

Science Conference Proceedings (OSTI)

This document reports the position and recommendations of the NRC Piping Review Committee, Task Group on Seismic Design. The Task Group considered overlapping conservation in the various steps of seismic design, the effects of using two levels of earthquake as a design criterion, and current industry practices. Issues such as damping values, spectra modification, multiple response spectra methods, nozzle and support design, design margins, inelastic piping response, and the use of snubbers are addressed. Effects of current regulatory requirements for piping design are evaluated, and recommendations for immediate licensing action, changes in existing requirements, and research programs are presented. Additional background information and suggestions given by consultants are also presented.

Not Available

1985-04-01T23:59:59.000Z

446

Using Whole-Building Electric Load Data in Continuous or Retro-Commissioning  

E-Print Network (OSTI)

in ContinuousorRetro?Commissioning PhillipN. Price,Conference on Building Commissioning: August 10-12, 2011Conference on Building Commissioning: August 10-12, 2011

Price, Phillip N.

2012-01-01T23:59:59.000Z

447

Commissioning of the superconducting ECR ion source VENUS at 18 GHz  

E-Print Network (OSTI)

Commissioning of the Superconducting ECR ion source VENUS atQ Analyzed FC Current (euA) COMMISSIONING RESULTS AT 18 GHZIn 2002 and 2003 initial commissioning at 18 GHz was carried

Leitner, Daniela; Abbott, Steven R.; Dwinell, Roger D.; Leitner, Matthaeus; Taylor, Clyde E.; Lyneis, Claude M.

2004-01-01T23:59:59.000Z

448

Commissioning of BL 7.2, the new diagnostic beam line at the ALS  

E-Print Network (OSTI)

COMMISSIONING OF BL 7.2, THE NEW DIAGNOSTIC BEAM LINE AT THEring in August 2003 and commissioning with the ALS electronafter. In this paper the commissioning results are presented

2004-01-01T23:59:59.000Z

449

STATE OF CALIFORNIA THE RESOURCES AGENCY ARNOLD SCHWARZENEGGER, Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

of hydroelectric and fuel cell facilities, respectively.) The Energy Commission recognizes the importanceCOMMISSION GUIDEBOOK RENEWABLES PORTFOLIO STANDARD ELIGIBILITY Fourth Edition JANUARY 2011 CEC3002010007CMF CALIFORNIA ENERGY COMMISSION Edmund G. Brown, Jr., Governor #12;CALIFORNIA ENERGY

450

Before the U.S.-China Economic and Security Review Commission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S.-China Economic and Security Review Commission Before the U.S.-China Economic and Security Review Commission Before the U.S.-China Economic and Security Review Commission By:...

451

Ex Parte Meeting between DOE and California Energy Commission Docket No EERE2008BTSTD0005 RIN 1904AB57  

Energy.gov (U.S. Department of Energy (DOE))

The California Energy Commission (Energy Commission) expressed concern about the differences in the stringency of California standards and the proposed DOE standards. The Energy Commission...

452

Northwestern Indiana Regional Planning Commission (Indiana) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northwestern Indiana Regional Planning Commission (Indiana) Northwestern Indiana Regional Planning Commission (Indiana) Northwestern Indiana Regional Planning Commission (Indiana) < Back Eligibility State/Provincial Govt Industrial Construction Local Government Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Indiana Program Type Siting and Permitting Provider Northwestern Indiana Regional Planning Commission NIRPC is a regional council of local governments serving the citizens of Lake, Porter, and LaPorte counties in Northwest Indiana. NIRPC provides a forum that enables the citizens of Northwest Indiana to address regional issues relating to transportation, the environment and community, and economic development. NIRPC, as a recipient of federal funds, is subject to

453

Oil and Gas Commission General Rules and Regulations (Arkansas) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commission General Rules and Regulations (Arkansas) Commission General Rules and Regulations (Arkansas) Oil and Gas Commission General Rules and Regulations (Arkansas) < Back Eligibility Agricultural Commercial Construction Fuel Distributor General Public/Consumer Industrial Installer/Contractor Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Utility Program Info State Arkansas Program Type Environmental Regulations Siting and Permitting Provider Department of Natural Resources The Oil and Gas Commission General Rules and Regulations are the body of rules and regulations that relate to natural gas production in Arkansas. The statutory law is found Arkansas Code Annotated Title 15 chapter 72. Contained in this summary are the rules and regulations most relevant to

454

European Commission Impact Assessment Tools | Open Energy Information  

Open Energy Info (EERE)

European Commission Impact Assessment Tools European Commission Impact Assessment Tools Jump to: navigation, search Tool Summary Name: IPTS-IA Tools Agency/Company /Organization: European Commission Joint Research Centre Sector: Energy Topics: Co-benefits assessment Resource Type: Guide/manual, Publications, Software/modeling tools User Interface: Other Website: iatools.jrc.ec.europa.eu/bin/view/IQTool/WebHome.html IPTS-IA Tools Screenshot References: IPTS-IA Tools[1] Overview "IA TOOLS is an online platform that provides Commission policy actors and impact assessment practitioners throughout Europe with a repository of guidance, information and best practices for the impact assessment of new policies and legislative measures. At one click, the IA TOOLS website provides expert and non-expert with guidance on the main steps to be

455

The FIRE infrared spectrometer at Magellan: construction and commissioning  

E-Print Network (OSTI)

We describe the construction and commissioning of FIRE, a new 0.8-2.5?m echelle spectrometer for the Magellan/ Baade 6.5 meter telescope. FIRE delivers continuous spectra over its full bandpass with nominal spectral ...

Simcoe, Robert A.

456

Task Force for Strategic Developments to Blue Ribbon Commission Recommendations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ribbon Commission Report and Ribbon Commission Report and Transportation Program Corinne Macaluso National Transportation Stakeholders Forum Knoxville, Tennessee May 16, 2012 2  Formed at the direction of the President to Secretary Chu and included leading experts.  Purpose to conduct a comprehensive review of polices for managing the back end of the nuclear fuel cycle; i.e., recycle before storage and permanent disposal.  Detailed analysis, with eight major recommendations; also recommended near-term actions. Blue Ribbon Commission & Report MAY 2012 3 Scope of Commission's Recommendation and Internal Assessment 1. A new, consent-based approach to siting future nuclear waste management facilities. 2. A new organization dedicated solely to implementing the waste

457

Task Force for Strategic Developments to Blue Ribbon Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Task Force for Strategic Developments to Blue Ribbon Commission Task Force for Strategic Developments to Blue Ribbon Commission Recommendations Task Force for Strategic Developments to Blue Ribbon Commission Recommendations Formed at the direction of the President to Secretary Chu and included leading experts. Purpose to conduct a comprehensive review of polices for managing the back end of the nuclear fuel cycle; i.e., recycle before storage and permanent disposal. Detailed analysis, with eight major recommendations; also recommended near-term actions. Task Force for Strategic Developments to Blue Ribbon Commission Recommendations More Documents & Publications Categorization of Used Nuclear Fuel Inventory in Support of a Comprehensive National Nuclear Fuel Cycle Strategy DOE Office of Nuclear Energy Transportation Planning, Route Selection, and

458

Public Utilities Commission of Nevada | Open Energy Information  

Open Energy Info (EERE)

Public Utilities Commission of Nevada Public Utilities Commission of Nevada Jump to: navigation, search Logo: Nevada Public Utilities Commission Name Nevada Public Utilities Commission Address 1150 East William St. Place Carson City, Nevada Zip 89701 Phone number 775-684-6110 Website http://pucweb1.state.nv.us/puc Coordinates 39.1707502°, -119.75655° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.1707502,"lon":-119.75655,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

459

Philippines-Support for the National Climate Commission | Open Energy  

Open Energy Info (EERE)

Philippines-Support for the National Climate Commission Philippines-Support for the National Climate Commission Jump to: navigation, search Name GIZ-Philippines-Support for the National Climate Commission Agency/Company /Organization Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Sector Climate Topics Background analysis, Low emission development planning, Pathways analysis Website http://www.giz.de/en/home.html Program Start 2012 Program End 2015 Country Philippines UN Region South-Eastern Asia References GIZ-Philippines-Support for the National Climate Commission[1] Philippine Climate Initiatives to get €3-Million Aid from German government[2] Program Overview "The German government will provide the Philippine government a total of €3-million, which will come in the form of a grant. Project partners

460

Arizona Oil and Gas Commission | Open Energy Information  

Open Energy Info (EERE)

Oil and Gas Commission Oil and Gas Commission Jump to: navigation, search Logo: Arizona Oil and Gas Commission State Arizona Name Arizona Oil and Gas Commission Address 416 W. Congress Street, Suite 100 City, State Tucson, Arizona Zip 85701 Website http://www.azogcc.az.gov/ Coordinates 32.221642°, -110.977439° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.221642,"lon":-110.977439,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Alaska Oil and Gas Conservation Commission | Open Energy Information  

Open Energy Info (EERE)

Conservation Commission Conservation Commission Jump to: navigation, search Logo: Alaska Oil and Gas Conservation Commission State Alaska Name Alaska Oil and Gas Conservation Commission Address 333 W. 7th Ave., Ste. 100 City, State Anchorage, Alaska Zip 9950 Website http://doa.alaska.gov/ogc/ Coordinates 61.215808°, -149.8889769° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":61.215808,"lon":-149.8889769,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

462

A Case Study of Retro-Commissioning using Building 90  

NLE Websites -- All DOE Office Websites (Extended Search)

A Case Study of Retro-Commissioning using Building 90 A Case Study of Retro-Commissioning using Building 90 Speaker(s): Liping Wang Date: June 16, 2011 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Philip Haves The performance of HVAC systems may fail to satisfy design expectations due to equipment degradations, incorrect control sequences or sensor failures. Retro-commissioning identifies and implements cost-effective operational and maintenance improvements in existing buildings to bring the buildings up to the design intents. In this study, Building 90 at LBNL is used as a case study to demonstrate the processes of retro-commissioning. Building energy benchmarking tools are applied to evaluate the energy performance for screening process at the whole building level. The building benchmarking results indicated a large energy saving potential for gas

463

Public Utility Commission of Texas | Open Energy Information  

Open Energy Info (EERE)

Commission of Texas Commission of Texas Jump to: navigation, search Logo: Public Utility Commission of Texas Name Public Utility Commission of Texas Address 1701 N. Congress Avenue Place Austin, Texas Zip 78701 Year founded 1975 Website http://www.puc.texas.gov/ Coordinates 30.2787191°, -97.7388076° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":30.2787191,"lon":-97.7388076,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

464

Microsoft Word - Eddy-LeaCommission20030618.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 18, 2003 June 18, 2003 Department of Energy Awards Eddy/Lea Regional Commission $300,000 Grant WASHINGTON, DC - Secretary of Energy Spencer Abraham announced today that the Department of Energy will award $300,000 to the Eddy/Lea Regional Commission, the community reuse organization (CRO) for southern New Mexico. This grant will fund part of the commission's operating costs, as well as other specific projects, including continuing the business expansion and retention of a 28-block downtown area and assisting in efforts to create new jobs by recruiting new business and industry. "The Energy Department is a good neighbor to the communities surrounding our sites," Secretary Abraham said. "We will continue to work with the Eddy/Lea Regional Commission and

465

Energy Policy Commission (North Dakota) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Policy Commission (North Dakota) Energy Policy Commission (North Dakota) Energy Policy Commission (North Dakota) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info Start Date 2007 State North Dakota Program Type Siting and Permitting Provider Empower Commission Created in 2007 by the North Dakota Legislative Assembly, the EmPower North

466

Energy Department Highlights Commissioning of Innovative Fuel Cell System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Highlights Commissioning of Innovative Fuel Cell Highlights Commissioning of Innovative Fuel Cell System at U.S. Army's Aberdeen Proving Ground Energy Department Highlights Commissioning of Innovative Fuel Cell System at U.S. Army's Aberdeen Proving Ground November 17, 2011 - 4:34pm Addthis The U.S. Department of Energy today recognized the commissioning of an innovative fuel cell system at the United States Army's Aberdeen Proving Ground in Maryland, which will supply the facility with emergency backup power. The four-stack system is one of the first of 18 fuel cells to be installed and operated at military bases across the country under an interagency partnership between the Department of Energy (DOE) and the Department of Defense (DOD). A ribbon cutting ceremony held at the base yesterday was led by Major General Nick Justice, Commander of the Army's

467

The Blue Ribbon Commission Offers Strong Step Forward | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Blue Ribbon Commission Offers Strong Step Forward The Blue Ribbon Commission Offers Strong Step Forward The Blue Ribbon Commission Offers Strong Step Forward July 29, 2011 - 12:27pm Addthis Damien LaVera Damien LaVera Deputy Director, Office of Public Affairs Today, the Blue Ribbon Commission on America's Nuclear Future issued a draft of its recommendations. The Obama Administration continues to believe that nuclear energy has an important role to play as America moves to a clean energy future. As part of our commitment to restarting the American nuclear industry and creating thousands of new jobs and export opportunities in the process, we are committed to finding a sustainable approach to assuring safe, secure long-term disposal of used nuclear fuel and nuclear waste. Secretary Chu appreciates the hard work done by the members of the Blue

468

Portland Community College Celebrates Commissioning of Combined Heat and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portland Community College Celebrates Commissioning of Combined Portland Community College Celebrates Commissioning of Combined Heat and Power Fuel Cell System Portland Community College Celebrates Commissioning of Combined Heat and Power Fuel Cell System October 3, 2011 - 4:43pm Addthis U.S. Energy Secretary Steven Chu today applauded the commissioning of a combined heat and power (CHP) fuel cell system at Portland Community College in Oregon. The CHP fuel cell system will help Portland Community College save on its energy bills and help achieve its energy efficiency and sustainability goals. Students at the College will also learn about the fuel cell technology used in the project as part of a comprehensive alternative energy curriculum offered by the school. "The benefits of a combined heat and power fuel cell system, coupled with

469

California Energy Commission Library Recent Acquisitions October December 2012  

E-Print Network (OSTI)

California Energy Commission Library Recent Acquisitions October ­ December 2012th Year: 2011 Call number: B.34/K811/2011 Cultural Resources California archaeology (Serial) Corp. Author: Society for California Archaeology Publisher: Left Coast Press Inc. Call number: 979

470

Orlando Utilities Commission- Commercial Energy Efficiency Rebate Program  

Energy.gov (U.S. Department of Energy (DOE))

Orlando Utilities Commission (OUC) offers rebates on a variety of energy efficient improvements for commercial customers. Customers should view the program brochure on the web site listed above for...

471

Commissioning and Performance Diagnostics for HVAC Control Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning and Performance Diagnostics for HVAC Control Systems Speaker(s): Ashish Singhal Date: December 20, 2006 - 12:00pm Location: 90-3122 Seminar HostPoint of Contact:...

472

Orlando Utilities Commission- Home Energy Efficiency Fix-Up Program  

Energy.gov (U.S. Department of Energy (DOE))

Orlando Utilities Commission's Home Energy Fix-Up Program provides assistance to low-income residential customers. To qualify for the program the total annual family income must be less than $40...

473

Blue Ribbon Commission on America's Nuclear Future Report to...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mr. Jonathan Lash, Dr. Allison M. Macfarlane, Dr. Richard A. Meserve, Dr. Ernest J. Moniz, Dr. Per Peterson, Mr. John Rowe, and Rep. Phil Sharp. The Commission and its...

474

File:07ORDExpeditedPlantCommissioningProcess.pdf | Open Energy...  

Open Energy Info (EERE)

usage The following page links to this file: GRRSection 7-OR-d - Expedited Plant Commissioning Process Retrieved from "http:en.openei.orgwindex.php?titleFile:07ORDExpedited...

475

Commissioning the New LCLS X-Band Transverse Deflecting Cavity...  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning the New LCLS X-Band Transverse Deflecting Cavity with Femtosecond Resolution Wednesday, July 31, 2013 - 3:00pm SLAC, Redtail Hawk Conference Room 108A Yuantao Ding...

476

Implementation of Energy Efficiency Measures and Continuous Commission...  

NLE Websites -- All DOE Office Websites (Extended Search)

Implementation of Energy Efficiency Measures and Continuous Commissioning in Two High-tech Buildings in Silicon Valley Speaker(s): Yaolin Lin Date: September 7, 2010 - 12:00pm...

477

How Post-occupancy Evaluation (POE) can help commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

How Post-occupancy Evaluation (POE) can help commissioning Speaker(s): Ryota Shirai Date: August 31, 2004 - 12:00pm Location: Bldg. 90 Seminar HostPoint of Contact: Naoya Motegi...

478

The Persistence of Savings Obtained from Commissioning of Existing Buildings  

E-Print Network (OSTI)

The objective of this study is to investigate the reasons why the performance of mechanical systems degrades over time after commissioning and to recommend intervals at which testing should be performed to maintain the integrity of the commissioning process. The initial phase of this study investigated the energy savings in ten buildings commissioned between 1996 and 1997. The results of this study show that hot water, chilled water and electric savings have all degraded. Aggregate annual cost savings for the ten buildings decreased by 17% from 1998 to 2000 from $1,192,884 to $985,626. The investigation has found that the decreased savings are due to numerous changes in control settings since the commissioning and to significant control malfunctions in two buildings.

Cho, Sool Yeon

2008-06-10T23:59:59.000Z

479

Introduction In 2008, Texas Transportation Commission Chair Deirdre Delisi  

E-Print Network (OSTI)

report by providing an enhanced analysis of the current and future state of the Texas transportationIntroduction In 2008, Texas Transportation Commission Chair Deirdre Delisi appointed members leaders was to provide an independent, authoritative assessment of the state's transportation

480

Richard Lazarus Named as Executive Director of National Commission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D.C. - The co-chairs of the bipartisan National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling have selected a highly regarded Georgetown University law...

Note: This page contains sample records for the topic "regulatory commission commission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

STUDY COMMISSIONED BY WEST LOTHIAN COUNCIL OIL-SHALE BINGS  

E-Print Network (OSTI)

#12;STUDY COMMISSIONED BY WEST LOTHIAN COUNCIL OIL-SHALE BINGS Dr Barbra Harvie School of Geo.....................................................................................................3 The birth of the oil industry ...........................................................................................................................3 The impact of oil on society

482

Using Computer Simulations for Design, Operation and Commissioning...  

NLE Websites -- All DOE Office Websites (Extended Search)

Using Computer Simulations for Design, Operation and Commissioning: Toward Better Building Performance Speaker(s): Liping Wang Date: March 28, 2012 - 12:00pm Location: 90-3122...

483

Results of the SNS front end commissioning at Berkeley Lab  

E-Print Network (OSTI)

RESULTS OF THE SNS FRONT END COMMISSIONING AT BERKELEY LAB *USA A. Aleksandrov for the SNS Accelerator Physics Group andT. Shea for the SNS Beam Diagnostics Collaboration Oak Ridge

2002-01-01T23:59:59.000Z

484

California Energy Commission - Natural Gas Consumption by County  

Open Energy Info (EERE)

County (2006-2009) Natural gas consumption data from the California Energy Commission sorted by County for Residential and Non-residential from 2006 to 2009. 2010-12-21T23:17:54Z...

485

Task Force for Strategic Developments to Blue Ribbon Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Task Force for Strategic Developments to Blue Ribbon Commission Task Force for Strategic Developments to Blue Ribbon Commission Recommendations Task Force for Strategic Developments to Blue Ribbon Commission Recommendations Formed at the direction of the President to Secretary Chu and included leading experts. Purpose to conduct a comprehensive review of polices for managing the back end of the nuclear fuel cycle; i.e., recycle before storage and permanent disposal. Detailed analysis, with eight major recommendations; also recommended near-term actions. Task Force for Strategic Developments to Blue Ribbon Commission Recommendations More Documents & Publications DOE Office of Nuclear Energy Transportation Planning, Route Selection, and Rail Issues Categorization of Used Nuclear Fuel Inventory in Support of a Comprehensive

486

Geothermal Advisory Committee to California State Energy Resources Development and Conservation Commission. Final report  

DOE Green Energy (OSTI)

The following are included: membership of the Geothermal Advisory Committee to the California Energy Commission, April 1978 to January 1979; discussion of committee value to commission and participants; benefits to commission in extending committee through 1979; final report preparation; commission requesting recommendations; committee recommendations for commission priorities; committee recommendations for commission policies; comments on direct-heat, on-site, and small scale generation, and Geysers counties land use concerns; and sample procedures submitted by Imperial County. (MHR)

Not Available

1979-01-01T23:59:59.000Z

487

STATE OF CALIFORNIA -NATURAL RESOURCES AGENCY EDMUND G. BROWN JR., Governor CALIFORNIA ENERGY COMMISSION  

E-Print Network (OSTI)

: Experimental and Numerical Studies in Gas Turbine Heat Transfer ­ Funding support from the Department of Energy and Numerical Studies in Gas Turbine Heat Transfer ­ Funding support from the Department of Energy, the National Regulatory Commission Faculty Development Grant for new faculty start-up funds o initiated a series

488

Commissioning/ verification : Daylighting The New York Times Building  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning/ verification Commissioning/ verification Overview The architectural approach The owner's approach Daylighting field study Daylighting control systems Automated roller shades Procurement specifications Shades and Shade Controls Lighting Controls Visualizing daylight Commissioning/ verification Demand response Mainstream solutions Post-occupancy evaluation Publications Sponsors Project team Commissioning/ verification The construction cycle of the building life cycle is the time when the design intent is translated into a physical reality. Given novel integrated systems with which contractors (vendors, installers, commissioning (Cx) agents, etc.) do not have much experience, there is a risk that carefully laid plans will go amiss. To insure that the automated shading and daylighting control systems were installed and operating as intended, the manufacturers, LBNL, and the Times Company developed procedures to commission and verify system performance. With verification data resulting from these procedures, the Times Company possessed the unique capability to measure and compare performance to design intent then discuss and tune system performance with the manufacturer prior to closure of the work scope and occupancy of the building.

489

Department of Energy Awards $400,000 to Eddy/Lea Regional Commission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to EddyLea Regional Commission Community Reuse Organization Department of Energy Awards 400,000 to EddyLea Regional Commission Community Reuse Organization Department of...

490

Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions  

E-Print Network (OSTI)

net median commissioning project cost was reduced by 49% oncommissioning project costs and savings. Commissioning isproportional to total project cost. The nature of activities

Mills, Evan

2010-01-01T23:59:59.000Z

491

Installation and Commissioning Automated Demand Response Systems  

Science Conference Proceedings (OSTI)

Demand Response (DR) can be defined as actions taken to reduce electric loads when contingencies, such as emergencies and congestion, occur that threaten supply-demand balance, or market conditions raise supply costs. California utilities have offered price and reliability DR based programs to customers to help reduce electric peak demand. The lack of knowledge about the DR programs and how to develop and implement DR control strategies is a barrier to participation in DR programs, as is the lack of automation of DR systems. Most DR activities are manual and require people to first receive notifications, and then act on the information to execute DR strategies. Levels of automation in DR can be defined as follows. Manual Demand Response involves a labor-intensive approach such as manually turning off or changing comfort set points at each equipment switch or controller. Semi-Automated Demand Response involves a pre-programmed demand response strategy initiated by a person via centralized control system. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. The receipt of the external signal initiates pre-programmed demand response strategies. We refer to this as Auto-DR (Piette et. al. 2005). Auto-DR for commercial and industrial facilities can be defined as fully automated DR initiated by a signal from a utility or other appropriate entity and that provides fully-automated connectivity to customer end-use control strategies. One important concept in Auto-DR is that a homeowner or facility manager should be able to 'opt out' or 'override' a DR event if the event comes at time when the reduction in end-use services is not desirable. Therefore, Auto-DR is not handing over total control of the equipment or the facility to the utility but simply allowing the utility to pass on grid related information which then triggers facility defined and programmed strategies if convenient to the facility. From 2003 through 2006 Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) developed and tested a series of demand response automation communications technologies known as Automated Demand Response (Auto-DR). In 2007, LBNL worked with three investor-owned utilities to commercialize and implement Auto-DR programs in their territories. This paper summarizes the history of technology development for Auto-DR, and describes the DR technologies and control strategies utilized at many of the facilities. It outlines early experience in commercializing Auto-DR systems within PG&E DR programs, including the steps to configure the automation technology. The paper also describes the DR sheds derived using three different baseline methodologies. Emphasis is given to the lessons learned from installation and commissioning of Auto-DR systems, with a detailed description of the technical coordination roles and responsibilities, and costs.

Global Energy Partners; Pacific Gas and Electric Company; Kiliccote, Sila; Kiliccote, Sila; Piette, Mary Ann; Wikler, Greg; Prijyanonda, Joe; Chiu, Albert

2008-04-21T23:59:59.000Z

492

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION  

E-Print Network (OSTI)

the proposed action quite obviously entails an increased potential for offsite consequences. Instead by nuclear power plants operating in or proposed for Maryland.@ Id. at 1-2. NIRS explains miles of the proposed reactor. She further recounts that she is Aparticularly 21 See Shaw AREVA MOX

Laughlin, Robert B.

493

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I  

Office of Legacy Management (LM)

REGION I REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 194061415 Docket No. 040-07123 JUL. 19 '996 License No. SUB-748 (Retired) United States -Department of Energy O ffice of EnvironmentalRestoration ATTN: W. Alexander Williams, Ph.D. EM-241 Cloverleaf Building 19901 Germantown Road Germantown, Maryland 20874-1290 SUBJECT: NL INDUSTRIES, ALBANY, NEW YORK Dear Dr. Williams: We are aware that DOE is responsible for the former National Lead Company (NL Industries) facility near Albany, New York. During a recent review of retired AEC License No. SUB-748, we found records which provide additional information concerning the use of source material at the facility. Copies of AEC documents which describe activities at that facility are enclosed. License No. SUB-00748 authorized possession of 38,000 pounds of uranium during

494

Nuclear Regulatory Commission approves construction of ...  

U.S. Energy Information Administration (EIA)

Uranium fuel, nuclear reactors, generation, spent fuel. Total Energy. ... near Spring City, Tennessee after initial construction began in 1973. ...

495

Federal Energy Regulatory Commission December 21, 2007  

E-Print Network (OSTI)

of the Enron Debtors ­ Enron Corp., Enron Power Marketing, Inc., Enron North America, Enron Energy Marketing marks continued progress toward resolution of the Western power market crisis of 2000-2001. Information on other settlements related to the western energy markets may be found on the FERC website at http://www

Laughlin, Robert B.

496

U.S. Nuclear Regulatory Commission  

E-Print Network (OSTI)

Applications International Applications (SAIC) technical and quality program files associated with the development of the draft NUREG. The CNWRA also reviewed the SAIC spreadsheet calculations for analyses used in the draft NUREG. These calculations were transmitted by the NRC to the CNWRA on compact disks The enclosed report includes changes to our previous document (Deliverable 08801.081.001) in response to Reference I and subsequent interactions between the CNWRA and NRC staffs. /7-Washington Office Twinbrook Metro Plaza #210

Account No; Sincf S; L. Camper; C. Haney; Cnwra Directors; R. Benke; R. Nelson; R. Hog

2001-01-01T23:59:59.000Z

497

U.S. Nuclear Regulatory Commission  

E-Print Network (OSTI)

NRC Job Code R3137Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin

Recommendations For Severe; J. A. Jones; N. Bixler; S. Burns; F. J. Schelling

2007-01-01T23:59:59.000Z

498

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION  

E-Print Network (OSTI)

1000 was designed by Westinghouse Electric Company, LLC, and has been formally approved by NRC. See, and show that the member has authorized the organization to intervene on his or her behalf. Vermont Yankee Nuclear Power Corp. (Vermont Yankee Nuclear Power Station), CLI-00-20, 52 NRC 151, 163 (2000). B. Ruling

Laughlin, Robert B.

499

Commissioning Residential Ventilation Systems: A Combined Assessment of  

NLE Websites -- All DOE Office Websites (Extended Search)

Commissioning Residential Ventilation Systems: A Combined Assessment of Commissioning Residential Ventilation Systems: A Combined Assessment of Energy and Air Quality Potential Values Title Commissioning Residential Ventilation Systems: A Combined Assessment of Energy and Air Quality Potential Values Publication Type Report LBNL Report Number LBNL-5969E Year of Publication 2012 Authors Turner, William J. N., Jennifer M. Logue, and Craig P. Wray Date Published 07/2012 Keywords commissioning, energy, health, indoor air quality, residential, valuation, ventilation Abstract Due to changes in building codes, whole-house mechanical ventilation systems are being installed in new California homes. Few measurements are available, but the limited data suggest that these systems don't always perform as code and forecasts predict. Such deficiencies occur because systems are usually field assembled without design specifications, and there is no consistent process to identify and correct problems. The value of such activities in terms of reducing energy use and improving indoor air quality (IAQ) is poorly understood. Commissioning such systems when they are installed or during subsequent building retrofits is a step towards eliminating deficiencies and optimizing the tradeoff between energy use and IAQ.

500

Field's Point Wastewater Treatment Facility (Narragansett Bay Commission) |  

Open Energy Info (EERE)

Field's Point Wastewater Treatment Facility (Narragansett Bay Commission) Field's Point Wastewater Treatment Facility (Narragansett Bay Commission) Jump to: navigation, search Name Field's Point Wastewater Treatment Facility (Narragansett Bay Commission) Facility Field's Point Wastewater Treatment Facility (Narragansett Bay Commission) Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Gilbane Building Company Developer Narragansett Bay Commission Energy Purchaser Field's Point Location Providence RI Coordinates 41.79260859°, -71.3896966° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.79260859,"lon":-71.3896966,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}