National Library of Energy BETA

Sample records for regulatory assistance project

  1. Regulatory Considerations for Developing Distributed Generation Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Webinar May 23, 2012 | Department of Energy Regulatory Considerations for Developing Distributed Generation Projects Webinar May 23, 2012 Regulatory Considerations for Developing Distributed Generation Projects Webinar May 23, 2012 Regulatory Considerations for Developing Distributed Generation Projects PDF icon regulatory_considerations_052312.pdf More Documents & Publications Regulatory Considerations for Developing Distributed Generation Projects Webinar May 23, 2012 Regulatory

  2. Regulatory Considerations for Developing Distributed Generation Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Webinar May 23, 2012 | Department of Energy Distributed Generation Projects Webinar May 23, 2012 Regulatory Considerations for Developing Distributed Generation Projects Webinar May 23, 2012 Document covers the Regulatory Considerations for Developing Distributed Generation Projects. PDF icon regulatory_considerations_052312.pdf More Documents & Publications Regulatory Considerations for Developing Distributed Generation Projects Webinar May 23, 2012 Regulatory Considerations for

  3. Tribal Renewable Energy Webinar: Project Regulatory Considerations...

    Broader source: Energy.gov (indexed) [DOE]

    Learn about the many permitting and project regulatory issues that need to be addressed when developing energy projects. Considerations include the Helping Expedite and Advance ...

  4. Alternative Fuels Data Center: Project Assistance

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Project Assistance to someone by E-mail Share Alternative Fuels Data Center: Project Assistance on Facebook Tweet about Alternative Fuels Data Center: Project Assistance on Twitter Bookmark Alternative Fuels Data Center: Project Assistance on Google Bookmark Alternative Fuels Data Center: Project Assistance on Delicious Rank Alternative Fuels Data Center: Project Assistance on Digg Find More places to share Alternative Fuels Data Center: Project Assistance on AddThis.com... More in this

  5. Daniel Cohen Assistant General Counsel for Legislation and Regulatory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2, 2014 Daniel Cohen Assistant General Counsel for Legislation and Regulatory Law Office ... Marc Persoon, MarincoMastervolt Wayne Kelso, Blue Sea Systems David Johnson, ...

  6. Daniel Cohen Assistant General Counsel for Legislation and Regulatory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Daniel Cohen Assistant General Counsel for Legislation and Regulatory Law Office of the General Counsel Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-0121 ...

  7. Project Development Technical Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Development Technical Assistance Project Development Technical Assistance Project development technical assistance is provided through expert guidance and analysis that helps address specific barriers Indian tribes and Alaska Native villages face while developing a clean energy project. Below is a list of the various options for this type of technical assistance. To apply for project development technical assistance, complete the online technical assistance request form. Project

  8. Tribal Renewable Energy Webinar: Project Regulatory Considerations |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Regulatory Considerations Tribal Renewable Energy Webinar: Project Regulatory Considerations August 31, 2016 11:00AM to 12:30PM MDT Learn about the many permitting and project regulatory issues that need to be addressed when developing energy projects. Considerations include the Helping Expedite and Advance Responsible Tribal Home Ownership (HEARTH) Act, land use, noise, birds, and other biological resources; visual impact; soil erosion and water quality; public health

  9. Regulatory Considerations for Developing Generation Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Considerations for Developing Generation Projects on Federal Lands 2 Purpose of ... - How does ownership and usage of a generation facility impact regulatory ...

  10. Project Management Expectations for Financial Assistance Activities

    Broader source: Energy.gov [DOE]

    Memo on Project Management Expectations for Financial Assistance Activities from David K. Garman, dated June 23, 2006.

  11. Federal Energy Management Program Renewable Energy Project Assistance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and utility-scale project planning assistance Acquisition ... Contract assistance Design review assistance ... Power at Federal Facilities Renewable Energy ...

  12. START Renewable Energy Project Development Assistance

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) Office of Indian Energy is now accepting applications for the third round of the Strategic Technical Assistance Response Team (START) Renewable Energy Project Development Assistance Program to provide Tribes with technical assistance with furthering the development of community- and commercial-scale renewable energy projects.

  13. Daniel Cohen Assistant General Counsel for Legislation and Regulatory Law

    Energy Savers [EERE]

    Daniel Cohen Assistant General Counsel for Legislation and Regulatory Law Office of the General Counsel Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-0121 Re: Ex Parte Memorandum Dear Mr. Cohen: On Tuesday, May 4, 2010, Kit Kennedy and Kate Houren of the Natural Resources Defense Council (NRDC) initiated a telephone call with Daniel Cohen and Bryan Miller of the Department of Energy's Office of the General Council. During the call, NRDC advocated for the adoption of the

  14. Regulatory Considerations for Developing Generation Projects on Federal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lands | Department of Energy Generation Projects on Federal Lands Regulatory Considerations for Developing Generation Projects on Federal Lands Presentation covers regulatory considerations for developing generation projects on federal lands. PDF icon regulatory_considerations_020613.pdf More Documents & Publications Coordinating Interstate ElectricTransmission Siting: An Introduction to the Debate Comments Received on Proposed Rulemaking for regulation implementing section 216(h):

  15. Renewable Energy Project Development Assistance (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-07-01

    This fact sheet provides information on the Tribes selected to receive assistance from the U.S. Department of Energy Office of Indian Energy 2013 Strategic Technical Assistance Response Team (START) Program, which provides technical expertise to support the development of next-generation energy projects on tribal lands.

  16. Energy Design Assistance Project Tracker - 2014 BTO Peer Review...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Design Assistance Project Tracker - 2014 BTO Peer Review Energy Design Assistance Project Tracker - 2014 BTO Peer Review Presenter: Larry Brackney, National Renewable Energy ...

  17. Energy Savings Performance Contract ENABLE Project Assistance | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Project Assistance Energy Savings Performance Contract ENABLE Project Assistance FEMP works closely with agencies to ensure successful ESPC ENABLE projects. FEMP works closely with agencies to ensure successful ESPC ENABLE projects. The Federal Energy Management Program (FEMP) offers project assistance to help federal agencies implement Energy Savings Performance Contract (ESPC) ENABLE projects. FEMP project assistance includes help from federal project executives to identify and

  18. EM Projects Perspective - Jack Surash, Deputy Assistant Secretary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental Management EM Projects Perspective - Jack Surash, Deputy ...

  19. United States Department of Energy Technical Assistance Project...

    Open Energy Info (EERE)

    Project (TAP) Webinar Archive Jump to: navigation, search Tool Summary LAUNCH TOOL Name: United States Department of Energy Technical Assistance Project (TAP) Webinar Archive...

  20. Industrial Assistance and Projects Databases | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Industrial Assistance and Projects Databases Industrial Assistance and Projects Databases AMO's databases provide information on energy assessments and recommendations, results and paybacks, and lessons learned by manufacturers who implement projects to save energy. Also review case studies from manufacturers. Combined Heat and Power (CHP) Project Profiles Database Arrow DOE's CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of CHP project profiles. The documents

  1. Energy Design Assistance Project Tracker - 2014 BTO Peer Review |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Design Assistance Project Tracker - 2014 BTO Peer Review Energy Design Assistance Project Tracker - 2014 BTO Peer Review Presenter: Larry Brackney, National Renewable Energy Laboratory The Energy Design Assistance Program Tracker (EDAPT) tracks and manages projects, performs automated quality checks of energy model designs, and generates project documentation and reports for commercial buildings. The ultimate goal of this project is to develop cost control best practice

  2. Federal Renewable Energy Project Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assistance Federal Renewable Energy Project Assistance Federal agencies can get renewable energy project assistance from the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), DOE national laboratories, and other federal agencies. FEMP also offers training to help agencies understand federal renewable energy requirements and goals, and provides renewable energy maps, tools, and a list of federal renewable energy projects. Assistance from FEMP FEMP offers renewable energy

  3. EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for

    Energy Savers [EERE]

    Acquisition and Project Management, Environmental Management | Department of Energy EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental Management EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental Management Presentation Topics EM Funding Evolution of EM Contracts EM Portfolio Project Success PDF icon Workshop 2015 -Jack Surash_EM Projects Perspective.pdf

  4. NREL: Technology Deployment - Project Technical Assistance and Support

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Technical Assistance and Support NREL provides technical assistance and support for projects around the globe by assessing resources, analyzing designs, and guiding project implementation to help identify clean energy solutions. Learn more about NREL's work in the following areas: Federal Agencies Federal Agencies International International Islands Islands Research Campuses Research Campuses State and Local Governments State and Local Governments Tribes Tribes Utilities Utilities

  5. DOE Financial Assistance Awards: Active Project Management | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Financial Assistance Awards: Active Project Management DOE Financial Assistance Awards: Active Project Management Presentation by Jim Alkire during the May 15 working lunch session at the 2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting. PDF icon DOE Financial Assistance Awards: Active Project Management More Documents & Publications Funding Opportunity Webinar - Advancing Solutions to Improve Energy

  6. NGNP Project Regulatory Gap Analysis for Modular HTGRs

    SciTech Connect (OSTI)

    Wayne Moe

    2011-09-01

    The Next Generation Nuclear Plant (NGNP) Project Regulatory Gap Analysis (RGA) for High Temperature Gas-Cooled Reactors (HTGR) was conducted to evaluate existing regulatory requirements and guidance against the design characteristics specific to a generic modular HTGR. This final report presents results and identifies regulatory gaps concerning current Nuclear Regulatory Commission (NRC) licensing requirements that apply to the modular HTGR design concept. This report contains appendices that highlight important HTGR licensing issues that were found during the RGA study. The information contained in this report will be used to further efforts in reconciling HTGR-related gaps in the NRC licensing structure, which has to date largely focused on light water reactor technology.

  7. Deputy Assistant Secretary for Acquisition and Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    J. E. "Jack" Surash Deputy Assistant Secretary for Acquisition and Project Management Office of Environmental Management United States Department of Energy Contract Management by...

  8. Federal Assistance Reporting Checklist and Instructions for Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Projects Federal Assistance Reporting Checklist and Instructions for Projects File DOE F 4600.2 FA RepReqChklst FINAL 10-2014.docx More Documents & Publications 1 1 Federal ...

  9. EAC Recommendations Regarding Emerging and Alternative Regulatory Models and Modeling Tools to Assist in Analysis (September 2014)

    Broader source: Energy.gov [DOE]

    EAC recommendations from the September 2014 meeting regarding Emerging and Alternative Regulatory Models and Modeling Tools to Assist in Analysis (September 2014)

  10. START Renewable Energy Project Development Technical Assistance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    experts who work directly with the selected project teams and tribal legalfinance specialists to address late-stage project development decisions, negotiations, and agreements. ...

  11. Strategic Energy Planning and Project Development Technical Assistance

    Broader source: Energy.gov [DOE]

    Technical experts from DOE and its national laboratories, along with other partnering organizations, provide up to 40 hours per year of in-depth support to assist tribes and Alaska Native villages with strategic energy planning and project development.

  12. Leveraged small business projects will receive free technical assistance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Leveraged small business projects will receive free technical assistance Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue:May 2016 all issues All Issues » submit Leveraged small business projects will receive free technical assistance Los Alamos and Sandia announce winners December 1, 2014 NMSBA principal investigator James Barefield from Los Alamos' Chemistry Division is getting ready to use a portable, backpack-mounted Laser-Induced

  13. Federal Assistance Reporting Checklist and Instructions for Projects |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy for Projects Federal Assistance Reporting Checklist and Instructions for Projects File DOE F 4600.2 FA RepReqChklst FINAL 10-2014.docx More Documents & Publications POLICY FLASH 2015-01 1 1

  14. Secretary Chu Announces Nearly $21 Million in Technical Assistance Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Improve Energy Use in Commercial Buildings | Department of Energy 21 Million in Technical Assistance Projects to Improve Energy Use in Commercial Buildings Secretary Chu Announces Nearly $21 Million in Technical Assistance Projects to Improve Energy Use in Commercial Buildings November 30, 2010 - 12:00am Addthis WASHINGTON, D.C. - During a live online chat at the White House earlier today, U.S. Energy Secretary Steven Chu announced that 24 projects are receiving a total of $21 million in

  15. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton; Kent Norris

    2009-12-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  16. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton

    2009-10-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  17. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton; Kent Norris

    2010-03-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  18. Deputy Assistant Secretary for Acquisition and Project Management

    Office of Environmental Management (EM)

    Surash Deputy Assistant Secretary for Acquisition and Project Management Office of Environmental Management United States Department of Energy On Department of Energy's Major System Construction Projects Before the Subcommittee on Energy and Water Development Committee on Appropriations United States House of Representatives March 20, 2013 Good morning, Mr. Chairman, Ranking Member Kaptur, and Members of the Subcommittee. Thank you for having me here today to provide you an update on the

  19. Energy Department Announces New Technical Assistance for Tribal Clean Energy Projects

    Broader source: Energy.gov [DOE]

    The Energy Department announced that five Tribes will receive technical assistance through the Strategic Technical Assistance Response Team (START) Program for renewable energy project development and installation.

  20. Technical Assistance Project for the Minnesota Pollution Control Agency

    SciTech Connect (OSTI)

    Vimmerstedt, L.

    2006-12-01

    This report was prepared in response to a request for technical assistance from the Minnesota Pollution Control Agency (MPCA). The U.S. Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy supported the National Renewable Energy Laboratory (NREL) in its response to this request through the Technical Assistance Project. Discussion with the MPCA identified the following as the highest-priority questions: What is the effect of (1) size of Renewable Energy Reserve (RER) and (2) duration of allocation award on (a) NOx emissions in Minnesota and (b) retail electricity prices? What data is available on the response of wind energy development to financial incentives? This report addresses those questions.

  1. Examples of OSUR Assisted Projects | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Auburn University California State at San Marcos Columbia University Prairie View A&M University Texas A&M University U. of West Virginia Contact OSUR Program Organization Contact Us Science Education Outreach Efforts Graduate Programs Off Site University Research (OSUR) Purpose PPPL Scientific and Engineering Capabilities Examples of OSUR Assisted Projects Auburn University California State at San Marcos Columbia University Prairie View A&M University Texas A&M University U. of

  2. Geothermal direct-heat utilization assistance. Quarterly project progress report, January--March 1994

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    The Geo-Heat Center provides technical assistance on geothermal direct heat applications to developers, consultants and the public which could include: data and information on low-temperature (< 1500 C) resources, space and district heating, geothermal heat pumps, greenhouses, aquaculture, industrial processes and other technologies. This assistance could include preliminary engineering feasibility studies, review of direct-use project plans, assistance in project material and equipment selection, analysis and solutions of project operating problems, and information on resources and utilization. The following are brief descriptions of technical assistance provided during the second quarter of the program.

  3. Federal Assistance Reporting Checklist and Instructions for RD&D Projects |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy for RD&D Projects Federal Assistance Reporting Checklist and Instructions for RD&D Projects PDF icon DOE F 4600.2, Financial Assistance Reporting Checklist for RD and D PDF icon Attachment 1, Research Performance Progress Report More Documents & Publications 1 1 Updated Reporting Requirement Checklists and Research Performance Progress Report (RPPR)

  4. Technical assistance for Meharry Medical College Energy Efficiency Project. Final project status and technical report

    SciTech Connect (OSTI)

    NONE

    1996-05-08

    This report presents the results of a program to provide technical assistance to Meharry Medical College. The purpose of the program is to facilitate Meharry`s effort to finance a campus-wide facility retrofit. The US Department of Energy (USDOE) funded the program through a grant to the Tennessee Department of Economic and Community Development (TECD). The University of Memphis-Technology and Energy Services (UM-TES), under contract to TECD, performed program services. The report has three sections: (1) introduction; (2) project definition, financing, and participants; and (3) opportunities for federal participation.

  5. Regulatory Assistance, Stakeholder Outreach, and Coastal and Marine Spatial Planning Activities in Support of Marine and Hydrokinetic Energy Deployment

    SciTech Connect (OSTI)

    Geerlofs, Simon H.; Copping, Andrea E.; Van Cleve, Frances B.; Blake, Kara M.; Hanna, Luke A.

    2011-09-30

    This fiscal year 2011 progress report summarizes activities carried out under DOE Water Power Task 2.1.7, Permitting and Planning. Activities under Task 2.1.7 address the concerns of a wide range of stakeholders with an interest in the development of the marine and hydrokinetic (MHK) energy industry, including regulatory and resource management agencies, tribes, nongovernmental organizations, and industry. Objectives for Task 2.1.7 are the following: • to work with stakeholders to streamline the MHK regulatory permitting process • to work with stakeholders to gather information on needs and priorities for environmental assessment of MHK development • to communicate research findings and directions to the MHK industry and stakeholders • to engage in spatial planning processes in order to further the development of the MHK industry. These objectives are met through three subtasks, each of which is described in this report: • 2.1.7.1—Regulatory Assistance • 2.1.7.2—Stakeholder Outreach • 2.1.7.3—Coastal and Marine Spatial Planning. As MHK industry partners work with the regulatory community and stakeholders to plan, site, permit, and license MHK technologies, they have an interest in a predictable, efficient, and transparent process. Stakeholders and regulators have an interest in processes that result in sustainable use of ocean space with minimal effects to existing ocean users. Both stakeholders and regulators have an interest in avoiding legal challenges by meeting the intent of federal, state, and local laws that govern siting and operation of MHK technologies. The intention of work under Task 2.1.7 is to understand and work to address these varied interests, reduce conflict, identify efficiencies, and ultimately reduce the regulatory costs, time, and potential environmental impacts associated with developing, siting, permitting, and deploying MHK systems.

  6. Unique Regulatory Approach for Licensing the Port Hope Remediation Project in Canada - 13315

    SciTech Connect (OSTI)

    Kostova, M.; Howard, D.; Elder, P.

    2013-07-01

    The Port Hope remediation project is a part of a larger initiative of the Canadian Federal Government the Port Hope Area Initiative (PHAI) which is based upon a community proposal. The Government of Canada, through Natural Resources Canada (NRCan) is investing $1.28 billion over 10 years to clean up historic low-level radioactive waste in the Port Hope Area and to provide long-term safe management of the low-level radioactive wastes in the Port Hope Area. These wastes arose from the activities of a former Federal Crown Corporation (Eldorado Nuclear) and its private sector predecessors. In Canada, historic waste are defined as low-level radioactive waste that was managed in a manner no longer considered acceptable, but for which the original producer cannot reasonably be held responsible or no longer exists and for which the Federal Government has accepted responsibility. In Canada, under the current regulatory framework, the environmental remediation is not considered as a distinct phase of the nuclear cycle. The regulatory approach for dealing with existing sites contaminated with radioactive residues is defined on the basis of risk and application of existing regulations. A unique regulatory approach was taken by the Canadian Nuclear Safety Commission (CNSC) to address the various licensing issues and to set out the requirements for licensing of the Port Hope Project within the current regulatory framework. (authors)

  7. Applications for START Clean Energy Project Development Technical Assistance Due May 22

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) Office of Indian Energy is accepting applications for the third round of Strategic Technical Assistance Response Team (START) Renewable Energy Project...

  8. Energy Savings Performance Contract Project Assistance for Agencies

    Office of Environmental Management (EM)

    in Oklahoma | Department of Energy Lead Workshop on Tribal Renewable Energy Development in Oklahoma Energy Department to Lead Workshop on Tribal Renewable Energy Development in Oklahoma June 1, 2015 - 9:50am Addthis Proposing and leading energy projects is a complex process. Each project and local energy situation is unique. Oklahoma tribal energy leaders have an opportunity to explore the tribal energy project development and financing process hands-on at an interactive workshop being

  9. Energy Department Extends Deadline to Apply for START Tribal Renewable Energy Project Development Assistance to May 22, 2015

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) Office of Indian Energy the application deadline for the third round of Strategic Technical Assistance Response Team (START) Renewable Energy Project Development Assistance to May 22, 2015.

  10. Federal Energy Management Program Recovery Act Technical Assistance Projects

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) issued a Call for Technical Services in May 2010 to help federal agencies identify and prioritize energy efficiency, water efficiency, and renewable energy projects. Read information about the Call for Technical Services (including technical service opportunities, application process, selection criteria, reporting requirements, and contacts).

  11. Geothermal direct-heat utilization assistance. Quarterly project progress report, January--March 1996

    SciTech Connect (OSTI)

    1996-05-01

    This report summarizes geothermal technical assistance, R&D, and technology transfer activities of the Geo-Heat Center. It describes 95 contacts with parties during this period related to technical assistance with goethermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics, and resources. Research activities are summarized on geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include publication of a geothermal direct use Bulletin, dissemination of information, goethermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  12. Regulatory Compliance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mountain projects. All technical work that will support the regulatory decision, from data collection to performance assessment analysis, is conducted under stringent quality...

  13. Geothermal direct-heat utilization assistance. Federal Assistance Program quarterly project progress report, April 1--June 30, 1998

    SciTech Connect (OSTI)

    1998-07-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the third quarter of FY98 (April--June, 1998). It describes 231 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with included requests for general information including material for high school and university students, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, snow melting and electric power. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers, and a comprehensive aquaculture developers package. A brochure on Geothermal Energy in Klamath County was developed for state and local tourism use. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 2) with articles on research at the Geo-Heat Center, sustainability of geothermal resources, injection well drilling in Boise, ID and a greenhouse project in the Azores. Other outreach activities include dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  14. Technical Assistance Project (TAP) Revolving Loan Funds: Basics and Best Practices

    Broader source: Energy.gov [DOE]

    Presentation by Texas LoanSTAR Manager Theresa Sifuentes from the Texas State Energy Conservation Office (SECO) at the August 26, 2009 TAP Webcast for the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Weatherization and Intergovernmental Program (WIP) Technical Assistance Project for state and local officials.

  15. Geothermal direct-heat utilization assistance. Federal Assistance Program: Quarterly project progress report, October--December 1992

    SciTech Connect (OSTI)

    Not Available

    1992-12-31

    Progress on technical assistance, R&D activities, technology transfer, and geothermal progress monitoring is summarized.

  16. Independent Verification and Validation Of SAPHIRE 8 Risk Management Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2009-11-01

    This report provides an evaluation of the risk management. Risk management is intended to ensure a methodology for conducting risk management planning, identification, analysis, responses, and monitoring and control activities associated with the SAPHIRE project work, and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  17. Assistance to Oil and Gas State Agencies and Industry through Continuation of Environmental and Production Data Management and a Water Regulatory Initiative

    SciTech Connect (OSTI)

    Grunewald, Ben; Arthur, Dan; Langhus, Bruce; Gillespie, Tom; Binder, Ben; Warner, Don; Roberts, Jim; Cox, D.O.

    2002-05-31

    This grant project was a major step toward completion of the Risk Based Data Management System (RBDMS) project. Additionally the project addresses the needs identified during the projects initial phases. By implementing this project, the following outcomes were sought: (1) State regulatory agencies implemented more formalized environmental risk management practices as they pertain to the production of oil and gas, and injection via Class II wells. (2) Enhancement of oil and gas production by implementing a management system supporting the saving of abandoned or idle wells located in areas with a relatively low environmental risk of endangering underground sources of drinking water (USDWs) in a particular state. (3) Verification that protection of USDWs is adequate and additional restrictions of requirements are not necessary in areas with a relatively low environmental risk. (4) Standardization of data and information maintained by state regulatory agencies and decrease the regulatory cost burden on producers operating in multiple states, and (5) Development of a system for electronic data transfer among operators and state regulatory agencies and reduction of overall operator reporting burdens.

  18. Geothermal direct-heat utilization assistance. Quarterly project progress report, July--September 1997

    SciTech Connect (OSTI)

    1997-10-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-97 (July--September 1997). It describes 213 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps, geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, acquaculture, equipment, district heating, resorts and spas, and industrial applications. Research activities include the completion of a Comprehensive Greenhouse Developer Package. Work accomplished on the revision of the Geothermal Direct Use Engineering and Design Guidebook are discussed. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 3), dissemination of information mainly through mailings of publications, geothermal library acquisition and use, participation in workshops, short courses, and technical meetings by the staff, and progress monitor reports on geothermal activities.

  19. Mixed and Low-Level Waste Treatment Facility project. Appendix A, Environmental and regulatory planning and documentation: Draft

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    Mixed and low-level wastes generated at the Idaho National Engineering Laboratory (INEL) are required to be managed according to applicable State and Federal regulations, and Department of Energy Orders that provide for the protection of human health and the environment. The Mixed and Low-Level Waste Treatment Facility Project was chartered in 1991, by the Department of Energy to provide treatment capability for these mixed and low-level waste streams. The first project task consisted of conducting engineering studies to identify the waste streams, their potential treatment strategies, and the requirements that would be imposed on the waste streams and the facilities used to process them. This report, Appendix A, Environmental & Regulatory Planning & Documentation, identifies the regulatory requirements that would be imposed on the operation or construction of a facility designed to process the INEL`s waste streams. These requirements are contained in five reports that discuss the following topics: (1) an environmental compliance plan and schedule, (2) National Environmental Policy Act requirements, (3) preliminary siting requirements, (4) regulatory justification for the project, and (5) health and safety criteria.

  20. Geothermal direct-heat utilization assistance: Quarterly project progress report, January--March 1995

    SciTech Connect (OSTI)

    1995-05-01

    The report summarizes geothermal activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-95. It describes 92 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, resources and equipment. Research activities are summarized on geothermal energy cost evaluation, low temperature resource assessment and ground-source heat pump case studies and utility programs. Outreach activities include the publication of a geothermal direct heat Bulletin, dissemination of information, geothermal library, and progress monitor reports on geothermal resources and utilization.

  1. Projects

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) funds a wide variety of renewable energy and energy efficiency projects in an effort to assist tribes in realizing their energy visions.

  2. Federal assistance program. Quarterly project progress report, January 1998--March 1998

    SciTech Connect (OSTI)

    1998-04-01

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-98-98 (January-March, 1998). It describes 268 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers and a comprehensive aquaculture developer package. The revised Geothermal Direct Use Engineering and Design Guidebooks was completed, published and is available for distribution. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 1) which was devoted entirely to geothermal equipment, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  3. Solar PV Project Financing: Regulatory and Legislative Challenges for Third-Party PPA System Owners

    SciTech Connect (OSTI)

    Kollins, K.; Speer, B.; Cory, K.

    2009-11-01

    Residential and commercial end users of electricity who want to generate electricity using on-site solar photovoltaic (PV) systems face challenging initial and O&M costs. The third-party ownership power purchase agreement (PPA) finance model addresses these and other challenges. It allows developers to build and own PV systems on customers? properties and sell power back to customers. However, third-party electricity sales commonly face five regulatory challenges. The first three challenges involve legislative or regulatory definitions of electric utilities, power generation equipment, and providers of electric services. These definitions may compel third-party owners of solar PV systems to comply with regulations that may be cost prohibitive. Third-party owners face an additional challenge if they may not net meter, a practice that provides significant financial incentive to owning solar PV systems. Finally, municipalities and cooperatives worry about the regulatory implications of allowing an entity to sell electricity within their service territories. This paper summarizes these challenges, when they occur, and how they have been addressed in five states. This paper also presents alternative to the third-party ownership PPA finance model, including solar leases, contractual intermediaries, standardized contract language, federal investment tax credits, clean renewable energy bonds, and waived monopoly powers.

  4. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance for Geothermal Resource Evaluation Projects

    SciTech Connect (OSTI)

    Robert P. Breckenridge; Thomas R. Wood; Joel Renner

    2010-09-01

    The purpose of this document is to report on the evaluation of geothermal resource potential on and around three different United States (U. S.) Air Force Bases (AFBs): Nellis AFB and Air Force Range (AFR) in the State of Nevada (see maps 1 and 5), Holloman AFB in the State of New Mexico (see map 2), and Mountain Home AFB in the State of Idaho (see map 3). All three sites are located in semi-arid parts of the western U. S. The U. S. Air Force, through its Air Combat Command (ACC) located at Langley AFB in the State of Virginia, asked the Federal Energy Management Program (FEMP) for technical assistance to conduct technical and feasibility evaluations for the potential to identify viable geothermal resources on or around three different AFBs. Idaho National Laboratory (INL) is supporting FEMP in providing technical assistance to a number of different Federal Agencies. For this report, the three different AFBs are considered one project because they all deal with potential geothermal resource evaluations. The three AFBs will be evaluated primarily for their opportunity to develop a geothermal resource of high enough quality grade (i.e., temperature, productivity, depth, etc.) to consider the possibility for generation of electricity through a power plant. Secondarily, if the resource for the three AFBs is found to be not sufficient enough for electricity generation, then they will be described in enough detail to allow the base energy managers to evaluate if the resource is suitable for direct heating or cooling. Site visits and meetings by INL personnel with the staff at each AFB were held in late FY-2009 and FY-2010. This report provides a technical evaluation of the opportunities and challenges for developing geothermal resources on and around the AFBs. An extensive amount of literature and geographic information was evaluated as a part of this assessment. Resource potential maps were developed for each of the AFBs.

  5. Alaska Energy in Action: Alaska Residents Tapping into Technical Assistance for Energy Projects

    Broader source: Energy.gov [DOE]

    Feature article from the Summer 2015 edition of the Alaska Energy Pioneer on DOE's technical assistance requests in Alaska.

  6. Regulatory Streamlining and Improvement

    SciTech Connect (OSTI)

    Mark A. Carl

    2006-07-11

    The Interstate Oil and Gas Compact Commission (IOGCC) engaged in numerous projects outlined under the scope of work discussed in the United States Department of Energy (DOE) grant number DE-FC26-04NT15456 awarded to the IOGCC. Numerous projects were completed that were extremely valuable to state oil and gas agencies as a result of work performed utilizing resources provided by the grant. There are numerous areas in which state agencies still need assistance. This additional assistance will need to be addressed under future scopes of work submitted annually to DOE's Project Officer for this grant. This report discusses the progress of the projects outlined under the grant scope of work for the 2005-2006 areas of interest, which are as follows: Area of Interest No. 1--Regulatory Streamlining and Improvement: This area of interest continues to support IOGCC's regulatory streamlining efforts that include the identification and elimination of unnecessary duplications of efforts between and among state and federal programs dealing with exploration and production on public lands. Area of Interest No. 2--Technology: This area of interest seeks to improve efficiency in states through the identification of technologies that can reduce costs. Area of Interest No. 3--Training and Education: This area of interest is vital to upgrading the skills of regulators and industry alike. Within the National Energy Policy, there are many appropriate training and education opportunities. Education was strongly endorsed by the President's National Energy Policy Development group. Acting through the governors offices, states are very effective conduits for the dissemination of energy education information. While the IOGCC favors the development of a comprehensive, long-term energy education plan, states are also supportive of immediate action on important concerns, such as energy prices, availability and conservation. Area of Interest No. 4--Resource Assessment and Development: This area of interest relates directly to helping maximize production of domestic oil and natural gas resources, including areas that are under explored or have not been adequately defined.

  7. Regulatory Considerations for Developing Distributed Generation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Considerations for Developing Distributed Generation Projects Webinar May 23, 2012 Regulatory Considerations for Developing Distributed Generation Projects Webinar May 23, ...

  8. Regulatory Considerations for Developing Distributed Generation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Distributed Generation Projects Webinar May 23, 2012 Regulatory Considerations for Developing Distributed Generation Projects Webinar May 23, 2012 Document covers the Regulatory ...

  9. Geothermal direct-heat utilization assistance. Quarterly project progress report, June--July 1992

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    Activities are summarized on the following: technical assistance to 57 information requests, R & D activities, technology transfer, and progress monitoring. (MHR)

  10. Systematic assessment of wellbore integrity for geologic carbon storage projects using regulatory and industry information

    SciTech Connect (OSTI)

    Moody, Mark; Sminchak, J.R.

    2015-11-01

    Under this three year project, the condition of legacy oil and gas wells in the Midwest United States was evaluated through analysis of well records, well plugging information, CBL evaluation, sustained casing pressure (SCP) field testing, and analysis of hypothetical CO2 test areas to provide a realistic description of wellbore integrity factors. The research included a state-wide review of oil and gas well records for Ohio and Michigan, along with more detailed testing of wells in Ohio. Results concluded that oil and gas wells are clustered along fields in areas. Well records vary in quality, and there may be wells that have not been identified in records, but there are options for surveying unknown wells. Many of the deep saline formations being considered for CO2 storage have few wells that penetrate the storage zone or confining layers. Research suggests that a variety of well construction and plugging approaches have been used over time in the region. The project concluded that wellbore integrity is an important issue for CO2 storage applications in the Midwest United States. Realistic CO2 storage projects may cover an area in the subsurface with several hundred legacy oil and gas wells. However, closer inspection may often establish that most of the wells do not penetrate the confining layers or storage zone. Therefore, addressing well integrity may be manageable. Field monitoring of SCP also indicated that tested wells provided zonal isolation of the reservoirs they were designed to isolate. Most of these wells appeared to exhibit gas pressure originating from intermediate zones. Based on these results, more flexibility in terms of cementing wells to surface, allowing well testing, and monitoring wells may aid operators in completing CO2 storage project. Several useful products were developed under this project for examining wellbore integrity for CO2 storage applications including, a database of over 4 million items on well integrity parameters in the study areas, a systematic CBL evaluation tool for rating cement in boreholes, SCP field testing procedures and analysis methodology, a process for summarizing well integrity at CO2 storage fields, a statistical analysis of well integrity indicators, and an assessment of practical methods and costs necessary to repair/remediate typical wells in the region based on assessment of six test study areas. Project results may benefit both CO2 storage and improved oil recovery applications. This study of wellbore integrity is a useful precursor to support development of geologic storage in the Midwest United States because it sheds more light on the actual well conditions (rather than the perceived condition) of historic oil and gas wells in the region.

  11. Clean Cities Technical Assistance Project (Tiger Teams) (Fact Sheet), Clean Cities, Energy Efficiency & Renewable Energy (EERE)

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Technical Assistance Project (Tiger Teams) Fleets across the nation have made great progress implementing alternative fuels, advanced vehicles, and fuel-saving measures into their operations. These efforts have saved billions of gallons of petroleum, and earned fleets recognition as sustainability leaders in the process. Yet as the alternative fuels and advanced vehicles landscape evolves, some fleets may encounter issues along the way. To address these challenges, the U.S. Depart- ment of

  12. START Program for Renewable Energy Project Development Assistance – Round Three Application

    Broader source: Energy.gov [DOE]

    Download the application for the START Program for Renewable Energy Project Development Assistance–Round Three.

  13. START Program for Renewable Energy Project Development Assistance Non-Disclosure Agreement

    Broader source: Energy.gov [DOE]

    Download the Non-Disclosure Agreement to submit along with your application for the DOE Office of Indian Energy Strategic Technical Assistance Response Team (START) Program for Renewable Energy...

  14. Recreational Technical Assistance in Hydropower Licensing | Open...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Recreational Technical Assistance in Hydropower LicensingPermittingRegulatory...

  15. Energy Planning Technical Assistance

    Broader source: Energy.gov [DOE]

    Energy project planning technical assistance is intended to assist Indian tribes and Alaska Native villages with early assessment, program design, and options analysis. Below is a list of the various options for this type of technical assistance.

  16. Vehicle Technologies Office Merit Review 2014: EV Project: Solar-Assisted Charging Demo

    Broader source: Energy.gov [DOE]

    Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about the EV project:...

  17. Geothermal direct-heat utilization assistance. Quarterly project progress report, October--December 1993

    SciTech Connect (OSTI)

    Not Available

    1993-12-31

    This report consists of brief summaries of the activities of the Geo-Heat Center during the report period. Technical assistance was given to requests from 20 states in the following applications: space and district heating; geothermal heat pumps; greenhouses; aquaculture; industrial plants; electric power; resource/well; equipment; and resort/spa. Research and development activities progressed on (1) compilation of data on low-temperature resources and (2) evaluation of groundwater vs. ground-coupled heat pumps. Also summarized are technology transfer activities and geothermal progress monitoring activities.

  18. Regulatory Assistance, Stakeholder Outreach, and Coastal and Marine Spatial Planning Activities In Support Marine and Hydrokinetic Energy Deployment: Task 2.1.7 Permitting and Planning Fiscal Year 2012 Year-End Report

    SciTech Connect (OSTI)

    Geerlofs, Simon H.; Hanna, Luke A.; Judd, Chaeli R.; Blake, Kara M.

    2012-09-01

    This fiscal year 2012 year-end report summarizes activities carried out under DOE Water Power task 2.1.7, Permitting and Planning. Activities under Task 2.1.7 address the concerns of a wide range of stakeholders with an interest in the development of the MHK industry, including regulatory and resource management agencies, tribes, NGOs, and industry. Objectives for 2.1.7 are the following: • To work with stakeholders to streamline the MHK regulatory permitting process. • To work with stakeholders to gather information on needs and priorities for environmental assessment of MHK development. • To communicate research findings and directions to the MHK industry and stakeholders. • To engage in spatial planning processes in order to further the development of the MHK industry. These objectives are met through three subtasks, each of which are described in this report: • 2.1.7.1—Regulatory Assistance • 2.1.7.2—Stakeholder Outreach • 2.1.7.3—Coastal and Marine Spatial Planning As the MHK industry works with the regulatory community and stakeholders to plan, site, permit and license MHK technologies they have an interest in a predictable, efficient, and transparent process. Stakeholders and regulators have an interest in processes that result in sustainable use of ocean space with minimal effects to existing ocean users. Both stakeholders and regulators have an interest in avoiding legal challenges by meeting the intent of federal, state, and local laws that govern siting and operation of MHK technologies. The intention of work under 2.1.7 is to understand these varied interests, explore mechanisms to reduce conflict, identify efficiencies, and ultimately identify pathways to reduce the regulatory costs, time, and potential environmental impacts associated with developing, siting, permitting, and deploying MHK systems.

  19. Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  20. Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-02-01

    This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  1. Vermont Small Hydropower Assistance Program Summary | Open Energy...

    Open Energy Info (EERE)

    to library PermittingRegulatory Guidance - Supplemental Material: Vermont Small Hydropower Assistance Program SummaryPermittingRegulatory GuidanceSupplemental Material...

  2. Vermont Small Hydropower Assistance Program Site-Specific Determinatio...

    Open Energy Info (EERE)

    to library PermittingRegulatory Guidance - Supplemental Material: Vermont Small Hydropower Assistance Program Site-Specific Determinations SummaryPermittingRegulatory...

  3. Vermont Small Hydropower Assistance Program Overview | Open Energy...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Vermont Small Hydropower Assistance Program OverviewPermittingRegulatory...

  4. Regulatory Burden RFI | Department of Energy

    Energy Savers [EERE]

    Regulatory Burden RFI Regulatory Burden RFI These comments are submitted by the Air-Conditioning, Heating and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice appearing in the Federal Register on February 3, 2011 requesting information to assist DOE in reviewing existing regulations and in making its regulatory program more effective and less burdensome. PDF icon Regulatory Burden RFI More Documents & Publications Regulatory Burden RFI from AHRI

  5. Regulatory Project Manager for Salina and Permian Basins for the NWTS (National Waste Terminal Storage) Program: Final techical report

    SciTech Connect (OSTI)

    Not Available

    1986-12-01

    The identification of candidate sites for nuclear waste repositories involves geological and environmental studies to characterize potential sites. These investigations include the collection and analysis of detailed geological and environmental data and comparison of the data against predetermined site performance criteria, i.e., geologic characteristics, environmental protection, and socioeconomic impacts. The work summarized in this final technical report encompasses mainly ''environmental characterization'' studies in the Permian Basin in the Texas Panhandle during the period of 1977-86; in the earlier phase of the contract, regional environmental work was also done in the Salina Basin (1977-79) and certain licensing support activities and safety analyses were conducted (1977-82). Considerable regulatory support work was also performed during 1986. 9 figs., 2 tabs.

  6. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    SciTech Connect (OSTI)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Project includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)

  7. Energy Department Develops Regulatory Roadmap to Spur Geothermal Energy Development

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Energy Department today issued a Geothermal Regulatory Roadmap that will help developers navigate regulatory requirements at every level of government to deploy geothermal energy projects.

  8. Guide to Financial Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory requirements are contained in the DOE Financial Assistance Rules, 10 CFR Part 600 and applicable program rules. Each year DOE obligates nearly 2 billion on financial ...

  9. Vermont Small Hydropower Assistance Program Screening Criteria...

    Open Energy Info (EERE)

    LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Vermont Small Hydropower Assistance Program Screening Criteria Summary and Application InstructionsPermitting...

  10. California - Establishing Transmission Project Review Streamlining...

    Open Energy Info (EERE)

    Regulatory Guidance - Supplemental Material: California - Establishing Transmission Project Review Streamlining DirectivesPermittingRegulatory GuidanceSupplemental Material...

  11. EM Projects Perspective

    Broader source: Energy.gov [DOE]

    Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental Management March 22, 2016

  12. Energy Department Extends Deadline to Apply for START Tribal Renewable Energy Project Development Assistance to May 22, 2015

    Broader source: Energy.gov [DOE]

    Program provides federally recognized tribal governments and other tribal entities with on-the-ground support to accelerate clean energy project deployment.

  13. Regulatory Tools

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regulatory Tools Home CRA - 2004 Final Recertification Decision CRA Comments & Responses CCA - 1996 CRA CARDs & TSDs CCA CARDs & TSDs Regulatory Tools Title 40 CFR Part 191 Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes. Title 40 CFR Part 194 Criteria for the Certification and Re-Certification of the Waste Isolation Pilot Plant's Compliance With the 40 CFR Part 191 Disposal Regulations.

  14. FEMP Launches New Technical Assistance Request Portal

    Broader source: Energy.gov [DOE]

    FEMP recently launched a new technical assistance request portal, which allows Federal agencies to submit and track requests for assistance for renewable energy projects.

  15. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. Army – Project 276 Renewable Resource Development on Department of Defense Bases in Alaska: Challenges and Opportunities

    SciTech Connect (OSTI)

    Warwick, William M.

    2010-09-30

    The potential to increase utilization of renewable energy sources among military facilities in Alaska through coordinated development and operation is the premise of this task. The US Army Pacific Command requested assistance from PNNL to help develop a more complete understanding of the context for wheeling power within Alaska, including legal and regulatory barriers that may prohibit the DOD facilities from wheeling power among various locations to optimize the development and use of renewable resources.

  16. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 224 Altus Air Force Base Solar Technologies

    SciTech Connect (OSTI)

    Russo, Bryan J.

    2010-09-30

    The principal goal of this project was to evaluate altus Air Force Base for building integrated silicon or thin film module photovoltaic opportunities. This report documents PNNL's efforts and documents study conclusions.

  17. Custom Renewable Energy Projects

    Broader source: Energy.gov [DOE]

    Project development assistance funding is available for a variety of purposes, including grant writing, feasibility studies, or technical assistance with design, permitting, or utility interconne...

  18. Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of CHP project profiles.

  19. Assisting Federal Facilities with Energy Conservation Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Federal Energy Management Program (FEMP) provides project assistance through the AFFECT funding opportunity. AFFECT provides grants for the development of capital projects to ...

  20. Nuclear Regulatory Commission Handling of Beyond Design Basis Events for Nuclear Power Reactors

    Broader source: Energy.gov [DOE]

    Presenter: Bill Reckley, Chief, Policy and Support Branch, Japan Lessons-Learned Project Directorate, Office of Nuclear Reactor Regulation, US Nuclear Regulatory Commission US Nuclear Regulatory Commission

  1. Environmental Compliance Assistance Tool

    Energy Science and Technology Software Center (OSTI)

    1999-04-16

    ENVIROCAT is a database/knowledge base software system designed to assist in environment, safety and health (ES&H) regulatory compliance assessments of manufacturing processes. Materials and processes are mapped to ES&H regulations. The regulations database identifies materials'' quantities and limits of compliance. Materials are identified per descriptive name or CAS number. ENVIROCAT has an interactive user/tool capability such that a question and answer session on materials and processes is custom tailored to a particular manufacturing site.

  2. Technical Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Assistance Technical Assistance The U.S. Department of Energy (DOE) Office of Indian Energy provides federally recognized Indian tribes, including Alaska Native villages, tribal energy resource development organizations, and other organized tribal groups and communities, with technical assistance to advance tribal energy projects. For general information or inquiries, please contact our help desk. On-Request TECHNICAL ASSISTANCE Technical experts from DOE and its national laboratories,

  3. Environmental Regulatory Update Table, November 1991

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-12-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  4. Environmental Regulatory Update Table, October 1990

    SciTech Connect (OSTI)

    Houlberg, L.M.; Noghrei-Nikbakht, P.A.; Salk, M.S.

    1990-11-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  5. Environmental regulatory update table, July 1991

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-08-01

    This Environmental Regulatory Update Table (July 1991) provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  6. Environmental Regulatory Update Table, December 1989

    SciTech Connect (OSTI)

    Houlbert, L.M.; Langston, M.E. ); Nikbakht, A.; Salk, M.S. )

    1990-01-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  7. Environmental Regulatory Update Table, October 1991

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-11-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  8. Environmental regulatory update table, March 1989

    SciTech Connect (OSTI)

    Houlberg, L.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1989-04-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  9. Environmental Regulatory Update Table, September 1991

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1991-10-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  10. Environmental Regulatory Update Table, August 1991

    SciTech Connect (OSTI)

    Houlberg, L.M., Hawkins, G.T.; Salk, M.S.

    1991-09-01

    This Environmental Regulatory Update Table (August 1991) provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  11. Environmental Regulatory Update Table, April 1989

    SciTech Connect (OSTI)

    Houlberg, L.; Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1989-05-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  12. Nuclear Energy Technical Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Energy Technical Assistance Nuclear Energy Technical Assistance "The United States will continue to promote the safe and secure use of nuclear power worldwide through a variety of bilateral and multilateral engagements. For example, the U.S. Nuclear Regulatory Commission advises international partners on safety and regulatory best practices, and the Department of Energy works with international partners on research and development, nuclear waste and storage, training, regulations,

  13. Projecting

    U.S. Energy Information Administration (EIA) Indexed Site

    Projecting the scale of the pipeline network for CO2-EOR and its implications for CCS infrastructure development Matthew Tanner Office of Petroleum, Gas, & Biofuels Analysis U.S. Energy Information Administration October 25, 2010 This paper is released to encourage discussion and critical comment. The analysis and conclusions ex- pressed here are those of the author and not necessarily those of the U.S. Energy Information Administration. Author: Matthew Tanner, matthew.tanner@eia.gov

  14. MemoAdvisoryAssistanceContractWaiver.pdf | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    MemoAdvisoryAssistanceContractWaiver.pdf More Documents & Publications ClosingLanguagePatentWaiverGrantCases.pdf UnSecMemoProjectManagementExpectationsFinancialAssistance23...

  15. Office of Fossil Energy's Technical Assistance | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The goal of our technical assistance program is to provide help with strategic energy planning and project development. Need Technical Assistance: The Office of Fossil Energy is ...

  16. Regulatory and Permitting Information Desktop Toolkit (Fact Sheet)

    SciTech Connect (OSTI)

    Young, K.

    2014-04-01

    Overview of DOE's Regulatory and Permitting Information Desktop (RAPID) Toolkit project, providing information on where to go to view documents and who to contact to get involved.

  17. California Department of Fish and Wildlife: Federal Energy Regulatory...

    Open Energy Info (EERE)

    Fish and Wildlife: Federal Energy Regulatory Commission (FERC) Hydroelectric Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: California...

  18. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Research Projects Joint Los Alamos National Laboratory/UCSD Research Projects Collaborations between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Jutta Kayser (505) 663-5649 Email Administrative Assistant Stacy Baker (505) 663-5233 Email "Since 2003, LANL has funded numerous collaborative

  19. Environmental Regulatory Update Table, January/February 1995

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Bock, R.E.; Mayer, S.J.; Salk, M.S.

    1995-03-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives impacting environmental, health, and safety management responsibilities. the table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  20. Sixth RFI Comment On Reducing Regulatory Burden | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sixth RFI Comment On Reducing Regulatory Burden Sixth RFI Comment On Reducing Regulatory Burden As part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' issued by the President on January 18, 2011, the Department of Energy(Department or DOE) is seeking comments and information from interested parties to assist DOE in reviewing its existing regulations to determine whether any such regulations should be modified, streamlined, expanded, or repealed.

  1. About Technical Assistance

    Broader source: Energy.gov [DOE]

    As technologies proceed along the development pipeline, most face major hurdles as they attempt to enter commercial markets. Our Technical Assistance program helps lower a range of institutional barriers to prepare innovative, energy-efficient technologies and energy management systems for full commercial deployment. These projects and activities address barriers that are not technical, Technology Readiness Level 9.

  2. Federal Energy Management Program Technical Assistance | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Federal Energy Management Program Technical Assistance Federal Energy Management Program Technical Assistance Apply for Technical Assistance Apply for Technical Assistance Visit the FEMP Technical Assistance Request Portal to apply for help with sustainable federal fleet and renewable energy projects. Read more Ask Questions Ask Questions Contact FEMP's project leaders with questions related to implementing energy efficiency and renewable energy projects. Read more 2015 AFFECT

  3. On-Request Technical Assistance

    Broader source: Energy.gov [DOE]

    Indian tribes and Alaska Native villages can apply annually to receive on-request technical assistance with energy planning; project development; policy, regulations, and codes; climate resilience; and village power issues. Assistance is provided by the U.S. Department of Energy (DOE) Office of Indian Energy and its national laboratories, along with other partnering organizations.

  4. Assisting Federal Facilities with Energy Conservation Technologies (AFFECT)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Funding Opportunity | Department of Energy Technical Assistance » Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Opportunity Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Opportunity The Federal Energy Management Program (FEMP) provides project assistance through the AFFECT funding opportunity. AFFECT provides grants for the development of capital projects to increase the energy efficiency and renewable energy

  5. Federal Wind Energy Assistance through NREL (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2009-09-01

    NREL assists with wind resource assessment and development activities initiated by federal agencies to facilitate distributed renewable energy projects at federal agency sites. This brief outlines the process for requesting NREL assistance with federal wind energy projects.

  6. START Program Project Sites

    Broader source: Energy.gov [DOE]

    The Strategic Technical Assistance Response Team (START) Program is part of the DOE Office of Indian Energy effort to assist in the development of tribal renewable energy projects. Through START,...

  7. Energy Savings Performance Contracts: FEMP Assistance

    Broader source: Energy.gov [DOE]

    Fact sheet details assistance and services available from the Federal Energy Management Program (FEMP) for energy savings performance contract (ESPC) projects.

  8. THE DOE GUIDE TO FINANCIAL ASSISTANCE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... assisted construction projects to provide equal opportunity, without regard to race, color, religion, sex or national origin, to persons employed or seeking employment with them. ...

  9. Federal Technical Assistance Aims to Accelerate Tribal Energy...

    Broader source: Energy.gov (indexed) [DOE]

    ... assistance focused on the following priority areas: strategic energy planning, grantee support, transmissioninterconnection, project development, finance, and lease agreements. ...

  10. Other Regulatory Efforts

    Broader source: Energy.gov [DOE]

    In addition to regulating international electricity trade, the Office of Electricity Delivery and Energy Reliability participates in other regulatory activities.

  11. Nuclear Safety Regulatory Framework

    Energy Savers [EERE]

    Department of Energy Nuclear Safety Regulatory Framework DOE's Nuclear Safety Enabling Legislation Regulatory Enforcement & Oversight Regulatory Governance Atomic Energy Act 1946 Atomic Energy Act 1954 Energy Reorganization Act 1974 DOE Act 1977 Authority and responsibility to regulate nuclear safety at DOE facilities 10 CFR 830 10 CFR 835 10 CFR 820 Regulatory Implementation Nuclear Safety Radiological Safety Procedural Rules ISMS-QA; Operating Experience; Metrics and Analysis Cross Cutting

  12. Regulatory Analysis on Criteria

    Office of Scientific and Technical Information (OSTI)

    Regulatory Analysis on Criteria for the Release of Patients Administered Radio active Material Final Report Manuscript Completed April 1996 Date Published: February 1997 S . Schneider, S . A. McGuire Division of Regulatory Applications Office of Nuclear Regulatory Research U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 DISCLArmER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency

  13. Portsmouth Site Regulatory Agreements | Department of Energy

    Energy Savers [EERE]

    Site Regulatory Agreements Portsmouth Site Regulatory Agreements PDF icon Portsmouth Administrative Consent Order - 1997 PDF icon Portsmouth Ohio Consent Decree - 1989 PDF icon Portsmouth Removal Action and Remedial Investigation and Feasibility Study and Remedial Design and Remedial Action (D&D Orders) Project Director's Final Findings and Order, Mods. 2011, 2012 PDF icon Portsmouth Integration Director's Final Findings and Order - 2011 PDF icon Portsmouth DUF6 Director's Final Findings and

  14. NREL: Technology Deployment - Project Development

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Development By employing our project development models, NREL offers a broad range of advisory services that are based off commercial practices and support the entire project development process to help reduce the risks associated with energy efficiency and renewable energy projects. This includes policy and regulatory analysis, financing alternatives, project management, proposal reviews, and project risk and technology assessments. Policy and Regulatory Analysis NREL analyzes federal

  15. Weatherization Assistance Program Technical Assistance Center

    SciTech Connect (OSTI)

    Robert Adams

    2009-01-07

    The following is a synopsis of the major achievements attributed to the operation of the Weatherization Assistance Program Technical Assistance Center (WAPTAC) by the National Association for State Community Services Programs (NASCSP). During the past five years, the WAPTAC has developed into the premier source for information related to operating the Weatherization Assistance Program (WAP) at the state and local levels. The services provide through WAPTAC include both virtual technical support as well as hands-on training and instruction in classroom and in the field. The WAPTAC achieved several important milestones during its operation including the establishment of a national Weatherization Day now celebrated in most states, the implementation of a comprehensive Public Information Campaign (PIC) to raise the awareness of the Program among policy makers and the public, the training of more than 150 new state managers and staff as they assume their duties in state offices around the country, and the creation and support of a major virtual information source on the Internet being accessed by thousands of staff each month. The Weatherization Assistance Program Technical Assistance Center serves the Department of Energy's (DOE) Office of Weatherization and Intergovernmental Program as a valuable training and technical assistance resource for the network of 54 direct state grantees (50 states, District of Columbia and three Native American tribes) and the network of 900 local subgrantees (comprised of community action agencies, units of local government, and other non-profit organizations). The services provided through WAPTAC focus on standardizing and improving the daily management of the WAP. Staff continually identify policies changes and best practices to help the network improve its effectiveness and enhance the benefits of the Program for the customers who receive service and the federal and private investors. The operations of WAPTAC are separated into six distinct areas: (1) Orientation for New WAP State Directors and Staff; (2) Pollution Occurrence Insurance Project; (3) Public Information Campaign; (4) State Management Training Project; (5) System for Integrating and Reviewing Technologies and Techniques; and (6) WAPTAC Services.

  16. Federal Energy Management Program Recovery Act Technical Assistance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects | Department of Energy Technical Assistance Projects Federal Energy Management Program Recovery Act Technical Assistance Projects Federal Energy Management Program Recovery Act Technical Assistance Projects The Federal Energy Management Program (FEMP) issued a Call for Technical Services in May 2010 to help federal agencies identify and prioritize energy efficiency, water efficiency, and renewable energy projects. Read information about the Call for Technical Services (including

  17. Reducing Regulatory Burden | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Request for information on reducing regulatory burden PDF icon Reducing Regulatory Burden More Documents & Publications Reducing Regulatory Burden DOE Comments Regulatory Burden RFI Reducing Regulatory Burden

  18. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Past Research Projects Composite-to-Steel Joint Integrity Monitoring and Assessment Collaboration between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Ellie Vigil (505) 667-2818 Email Administrative Assistant Rebecca Duran (505) 665-8899 Email UCSD Faculty and Graduate Students Professor

  19. Regulatory Considerations for Developing Generation Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Coordinating Interstate ElectricTransmission Siting: An Introduction to the Debate Comments Received on Proposed Rulemaking for regulation ...

  20. TO: Honorable Patricia Hoffman, Assistant Secretary for

    Energy Savers [EERE]

    TO: Honorable Patricia Hoffman, Assistant Secretary for Electricity Delivery and Energy Reliability, U.S. Department of Energy FROM: Electricity Advisory Committee (EAC) Richard Cowart, Chair DATE: September 24, 2014 RE: Recommendations Regarding Emerging and Alternative Regulatory Models and Modeling Tools to Assist in Analysis Introduction For closely linked reasons (e.g. proliferation of distributed generation, advances in technology, desire to integrate renewable generation, customer

  1. Geothermal Regulatory Roadmap

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Geothermal Regulatory Roadmap Katherine Young National Renewable Energy Laboratory Track: ... restricted information. 2 | US DOE Geothermal Office eere.energy.gov RelevanceImpact ...

  2. Georgia Shore Assistance Act

    SciTech Connect (OSTI)

    Pendergrast, C.

    1984-01-01

    The Georgia General Assembly passed the Shore Assistance Act in 1979 in order to fill a regulatory gap in the state's management of its coastal resources. A review of its legislative history, purposes, applications, and effects in terms of the sand sharing system of sand dunes, beaches, sandbars, and shoals concludes that the Act is poorly drafted. In its application on the oceanfront, it betrays its intent and protects the oceanfront owner. It has failed to satisfy the requirements of the public trust in the tidal foreshore. Amendments to clarify its understanding of the functions and values of the sand-sharing system should also conform with the state's duties under the public trust. 139 references.

  3. American Recovery and Reinvestment Act (ARRA) Federal Energy Management Program Technical Assistance Project 281 Solar Hot Water Application Assessment for U.S. Army IMCOM-Southeast Region

    SciTech Connect (OSTI)

    Russo, Bryan J.; Chvala, William D.

    2010-09-30

    The Energy Independence and Security Act of 2007 requires installations (EISA) to install solar systems of sufficient capacity to provide 30% of service hot water in new construction and renovations where cost-effective. However, installations are struggling with how to implement solar hot water, and while several installations are installing solar hot water on a limited basis, paybacks remain long. Pacific Northwest National Laboratory (PNNL) was tasked to address this issue to help determine how best to implement solar hot water projects. This documents discusses the results of that project.

  4. Microsoft Word - AGA Comments on 2011 Regulatory Burden RFI

    Energy Savers [EERE]

    April 15. 2011 U.S. Department of Energy Mr. Daniel Cohen Assistant General Counsel for Legislation, Regulation and Energy Efficiency Office of the General Counsel 1000 Independence Avenue, SW Washington, DC 20585 Via Email: Regulatory.Review@hq.doe.gov Subject: Reducing Regulatory Burden, Request for Information, Federal Register Vol. 76, No. 23, February 3, 2011 Dear Mr. Cohen: The American Gas Association (AGA) appreciates the opportunity to respond to the subject Department of Energy

  5. Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Burden RFI | Department of Energy Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory Burden RFI Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory Burden RFI These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice in the August 8, 2012 Federal Register requesting information to assist DOE in reviewing existing regulations and in making its

  6. Reducing Regulatory Burden EO 13563 Fifth RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EO 13563 Fifth RFI Reducing Regulatory Burden EO 13563 Fifth RFI As part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' issued by the President on January 18, 2011, the Department of Energy(Department or DOE) is seeking comments and information from interested parties to assist DOE in reviewing its existing regulations to determine whether any such regulations should be modified, streamlined, expanded, or repealed. PDF icon ReducRegBurden EO 13563

  7. Reducing Regulatory Burden EO 13563 Third RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RFI Reducing Regulatory Burden EO 13563 Third RFI As part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' issued by the President on January 18, 2011, the Department of Energy (Department or DOE) is seeking comments and information from interested parties to assist DOE in reviewing its existing regulations to determine whether any such regulations should be modified, streamlined, expanded, or repealed. PDF icon ReducRegBurden_EO_13563_Third_RFI.pdf

  8. Environmental Regulatory Update Table, September/October 1993

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.; Danford, G.S.; Lewis, E.B.

    1993-11-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operation and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  9. Environmental Regulatory Update Table, November--December 1993

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.; Danford, G.S.; Lewis, E.B.

    1994-01-01

    The Environmental Regulatory Update Table provides information on regulatory of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  10. Environmental Regulatory Update Table, January/February 1992

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1992-03-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action. This table is for January/February 1992.

  11. Environmental Regulatory Update Table, November--December 1992

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Lewis, E.B.; Salk, M.S.

    1993-01-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly wit information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  12. Environmental sciences division: Environmental regulatory update table July 1988

    SciTech Connect (OSTI)

    Langston, M.E.; Nikbakht, A.; Salk, M.S.

    1988-08-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated each month with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  13. Environmental Regulatory Update Table, March/April 1992

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.

    1992-05-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  14. Environmental regulatory update table, September--October 1992

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Lewis, E.B.; Salk, M.S.

    1992-11-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  15. Environmental Regulatory Update Table, July--August 1992

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Lewis, E.B.; Salk, M.S.

    1992-09-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  16. Environmental Regulatory Update Table, January--February 1993

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.; Danford, G.S.; Lewis, E.B.

    1993-03-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  17. Environmental regulatory update table, March--April 1994

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Bock, R.E.; Salk, M.S.

    1994-03-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  18. Environmental regulatory update table November--December 1994

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Bock, R.E.; Mayer, S.J.; Salk, M.S.

    1995-01-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  19. Environmental Regulatory Update Table, January--February 1994

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Salk, M.S.; Danford, G.S.; Lewis, E.B.

    1994-03-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations ad contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  20. Environmental regulatory update table: September/October 1994

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Bock, R.E.; Salk, M.S.

    1994-11-01

    The Environmental Regulatory Update Table provides information on regulatory initiatives of interest to DOE operations and contractor staff with environmental management responsibilities. The table is updated bi-monthly with information from the Federal Register and other sources, including direct contact with regulatory agencies. Each table entry provides a chronological record of the rulemaking process for that initiative with an abstract and a projection of further action.

  1. Nuclear Regulatory Commission Regulatory and Licensing Matters | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Regulatory Commission Regulatory and Licensing Matters Nuclear Regulatory Commission Regulatory and Licensing Matters GC-52 provides legal advice to DOE regarding Nuclear Regulatory Commission (NRC) regulatory and licensing matters of interest to DOE, either as an NRC license applicant or in connection with related authorities and responsibilities of DOE and NRC on nuclear material, nuclear waste, and nuclear nonproliferation matters. GC-52 attorneys provide advice and support on a

  2. Regulatory Burden RFI: Revitalization of DOE's Role as a Regulatory

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Watchdog | Department of Energy RFI: Revitalization of DOE's Role as a Regulatory Watchdog Regulatory Burden RFI: Revitalization of DOE's Role as a Regulatory Watchdog This Memorandum serves as an Executive Summary of Center for Regulatory Effectiveness' (CRE's) attached comments highlighting four issues: PDF icon CRE_Response-DOE_Regulatory_Review_Request_for_Comments.pdf More Documents & Publications DOE Review of Regulations - Center for Regulatory Effectiveness Comments DOE Ex Parte

  3. Phenylpropanoid related regulatory protein-regulatory region associations

    DOE Patents [OSTI]

    Apuya, Nestor; Bobzin, Steven Craig; Park, Joon-Hyun; Doukhanina, Elena

    2012-01-03

    Materials and methods for identifying lignin regulatory region-regulatory protein associations are disclosed. Materials and methods for modulating lignin accumulation are also disclosed.

  4. Environmental Regulatory Update Table, May/June 1992

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Lewis, E.B.; Salk, M.S.

    1992-07-01

    This report contains a bi-monthly update of environmental regulatory activity that is of interest to the Department of Energy. It is provided to DOE operations and contractor staff to assist and support environmental management programs by tracking regulatory developments. Any proposed regulation that raises significant issues for any DOE operation should be reported to the Office of Environmental Guidance (EH-23) as soon as possible so that the Department can make its concerns known to the appropriate regulatory agency. Items of particular interest to EH-23 are indicated by a shading of the RU{number_sign}.

  5. Environmental Regulatory Update Table, May/June 1992

    SciTech Connect (OSTI)

    Houlberg, L.M.; Hawkins, G.T.; Lewis, E.B.; Salk, M.S.

    1992-07-01

    This report contains a bi-monthly update of environmental regulatory activity that is of interest to the Department of Energy. It is provided to DOE operations and contractor staff to assist and support environmental management programs by tracking regulatory developments. Any proposed regulation that raises significant issues for any DOE operation should be reported to the Office of Environmental Guidance (EH-23) as soon as possible so that the Department can make its concerns known to the appropriate regulatory agency. Items of particular interest to EH-23 are indicated by a shading of the RU{number sign}.

  6. Savannah River Site Waste Disposition Project

    Office of Environmental Management (EM)

    Terrel J. Spears Assistant Manager Waste Disposition Project DOE Savannah River Operations Office Savannah River Site Savannah River Site Waste Disposition Project Waste ...

  7. Geothermal Regulatory Roadmap Workshop at GRC | Open Energy Informatio...

    Open Energy Info (EERE)

    Workshop at GRC Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections GRR Project Review and Workshop Register for this...

  8. Project Execution Plan Review Module (RM) | Department of Energy

    Office of Environmental Management (EM)

    Review Module (RM) Project Execution Plan Review Module (RM) The Project Execution Plan (PEP) Review Module (RM) is a tool that assists DOE federal project review teams in...

  9. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance US General Serices Administration - Project 193, John W. Bricker Federal Building, Columbus, OH

    SciTech Connect (OSTI)

    Arends, J.; Sandusky, William F.

    2010-05-31

    This report documents the findings from an onsite audit of the John W. Bricker Federal building located in Columbus, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would either reduce electrical and gas consumption or increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

  10. American Recovery and Reinvestment Act ( ARRA) FEMP Technical Assistance, U.S. General Services Administration - Project 194 U.S. Custom Cargo Inspection Facility, Detroit, MI

    SciTech Connect (OSTI)

    Arends, J.; Sandusky, William F.

    2010-05-31

    This report documents the findings of an on-site audit of the U.S. Customs Cargo Inspection Facility (CIF) in Detroit, Michigan. The federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy-efficiency opportunities that, once implemented, would reduce electrical and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

  11. American Recovery and Reinvestment Act Federal Energy Management Program Technical Assistance Project 184 U.S. Customs and Border Protection Laboratory, Houston, Texas

    SciTech Connect (OSTI)

    Arends, J.; Sandusky, William F.

    2010-09-30

    This report documents the findings of an on-site energy audit of the U.S. Customs and Border Protection (CBP) Laboratory in Houston, Texas. The focus of the audit was to identify various no-cost and low-cost energy efficiency opportunities that, once implemented, would reduce electricity and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

  12. 9003: Biorefinery Assistance Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9003: Biorefinery Assistance Program 9003: Biorefinery Assistance Program Breakout Session 1D-Building Market Confidence and Understanding I: Integrated Biorefinery (Lessons Learned and Best Practices) 9003: Biorefinery Assistance Program Chris Cassidy, National Business Renewable Energy Advisor, U.S. Department of Agriculture PDF icon cassidy_biomass_2014.pdf More Documents & Publications Project Finance and Investments Demonstration and Deployment Workshop - Day 1 American Process-Alpena

  13. Spent Nuclear Fuel Project Safety Management Plan

    SciTech Connect (OSTI)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities.

  14. Daniel Cohen Assistant General Counsel for Legislation and Regulatory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Kit Kennedy and Kate Houren of the Natural Resources Defense Council; Tim Ballo of ... Council for an Energy-Efficient Economy; Karen Meyers of Rheem Manufacturing ...

  15. Daniel Cohen Assistant General Counsel for Legislation and Regulatory Law

    Energy Savers [EERE]

    Daniel B. Poneman About Us Daniel B. Poneman - Former Deputy Secretary of Energy Daniel B. Poneman Former Deputy Secretary Daniel Poneman was nominated by President Obama to be Deputy Secretary of Energy on April 20, 2009, and was confirmed by the United States Senate on May 18, 2009. Under the leadership of Secretary of Energy Steven Chu, Mr. Poneman also served as Chief Operating Officer of the Department. Between April 23, 2013, and May 21, 2013, Mr. Poneman served as Acting Secretary of

  16. Environmental Regulatory Framework

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Identification (PRID) system is a project planning tool to identify potential environmental project permits and requirements, and to facilitate subject-matter expert...

  17. EPA Source Reduction Assistance Grant Program

    Broader source: Energy.gov [DOE]

    The U.S. Environmental Protection Agency (EPA) is accepting applications for the Source Reduction Assistance Grant Program to support pollution prevention/source reduction and/or resource conservation projects that reduce or eliminate pollution at the source.

  18. Assistance to States on Electric Industry Issues

    SciTech Connect (OSTI)

    Glen Andersen

    2010-10-25

    This project seeks to educate state policymakers through a coordinated approach involving state legislatures, regulators, energy officials, and governors’ staffs. NCSL’s activities in this project focus on educating state legislators. Major components of this proposal include technical assistance to state legislatures, briefing papers, coordination with the National Council on Electricity Policy, information assistance, coordination and outreach, meetings, and a set of transmission-related activities.

  19. EIS-0508: Downeast LNG Import-Export Project, Robbinston, Maine...

    Office of Environmental Management (EM)

    8: Downeast LNG Import-Export Project, Robbinston, Maine EIS-0508: Downeast LNG Import-Export Project, Robbinston, Maine SUMMARY The Federal Energy Regulatory Commission (FERC) is ...

  20. EIS-0501: Golden Pass LNG Export and Pipeline Project, Texas...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Golden Pass LNG Export and Pipeline Project, Texas and Louisiana EIS-0501: Golden Pass LNG Export and Pipeline Project, Texas and Louisiana Summary The Federal Energy Regulatory ...

  1. MEMORANDUM FOR DISTRIBUTION FROM: JAMES A. RISPOLI ASSISTANT...

    Office of Environmental Management (EM)

    River Operations Office David C. Moody, Manager, Carlsbad ... Federal Project Office Richard Schassburger, Director, ... and Technology, EM-20 Mark W. Frei, Deputy Assistant ...

  2. Deputy Assistant Secretary Jack Surash's Written Statement before...

    Office of Environmental Management (EM)

    on Major System Construction Projects (March 20, 2013) Deputy Assistant Secretary Jack Surash's Written Statement before the Subcommittee on Energy and Water Development on...

  3. AHAM Comments_DOE Reducing Regulatory Burden July 2015_FINAL (00039527).DOC

    Energy Savers [EERE]

    7, 2015 By E-Mail Aaron Stevenson U.S. Department of Energy, Office of the General Counsel Office of the Assistant General Counsel for Legislation, Regulation, and Energy Efficiency 1000 Independence Ave., SW Washington, D.C. 20585 Regulatory.Review@hq.doe.gov Re: Regulatory Burden RFI Dear Mr. Stevenson: The Association of Home Appliance Manufacturers (AHAM) respectfully submits the following comments to the Department of Energy (DOE) on its Regulatory Burden RFI, 79 Fed. Reg. 37963 (July 3,

  4. The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2012, OAS-L-13-01

    Energy Savers [EERE]

    2 OAS-L-13-01 November 2012 Department of Energy Washington, DC 20585 November 7, 2012 MEMORANDUM FOR THE EXECUTIVE DIRECTOR, FEDERAL ENERGY REGULATORY COMMISSION FROM: Daniel M. Weeber Assistant Inspector General for Audits and Administration Office of Inspector General SUBJECT: INFORMATION: Evaluation Report on "The Federal Energy Regulatory Commission's Unclassified Cyber Security Program - 2012" BACKGROUND The Federal Energy Regulatory Commission (Commission) is an independent

  5. Step 2: Project Options

    Energy Savers [EERE]

    2: Project Options 2 2 Design 1 Potential 3 Refinement 4 Implementation 2 Options 5 Operations & Maintenance 1/28/2016 2 Presentation Agenda * Step 2: Project Options * Project members and roles * Activity * Project ownership options - Interconnection, net metering, permitting, and considerations * Tools * Case in Point 3 Potential Options Refinement Implementation Operations & Maintenance 4 Step 2: Roles, Business Structures, & Regulatory Considerations Purpose: Determine ownership

  6. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Energy Savers [EERE]

    Jordan Cove Energy Project LP Docket No. CP13-483-000 Pacific Connector Gas Pipeline LP Docket No. CP13-492-000 NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED JORDAN COVE LIQUEFACTION AND PACIFIC CONNECTOR PIPELINE PROJECTS (September 30, 2015) The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a final environmental impact statement (EIS) for the Jordan Cove Liquefaction Project proposed by Jordan Cove Energy Project LP

  7. Regulatory Promotion of Emergent CCS Technology

    SciTech Connect (OSTI)

    Davies, Lincoln; Uchitel, Kirsten; Johnson, David

    2014-01-01

    Despite the growing inevitability of climate change and the attendant need for mitigation strategies, carbon capture and sequestration (CCS) has yet to gain much traction in the United States. Recent regulatory proposals by the U.S. Environmental Protection Agency (EPA), limited in scope to new-build power plants, represent the only significant policy initiative intended to mandate diffusion of CCS technology. Phase I of this Project assessed barriers to CCS deployment as prioritized by the CCS community. That research concluded that there were four primary barriers: (1) cost, (2) lack of a carbon price, (3) liability, and (4) lack of a comprehensive regulatory regime. Phase II of this Project, as presented in this Report, assesses potential regulatory models for CCS and examines where those models address the hurdles to diffusing CCS technology identified in Phase I. It concludes (1) that a CCS-specific but flexible standard, such as a technology performance standard or a very particular type of market-based regulation, likely will promote CCS diffusion, and (2) that these policies cannot work alone, but rather, should be combined with other measures, such as liability limits and a comprehensive CCS regulatory regime.

  8. SCFA lead lab technical assistance review of the Pit 7 Complex source containment

    SciTech Connect (OSTI)

    Eaton, D.; Janeday, D.; Woodward, D.; Imrich, J.; Evans, J.; Morris, M.; Reimus, P.; Hazen, T.

    2001-01-29

    On January 29-30, 2001 a technical assistance team (TAT) met with the Pit 7 project team at Lawrence Livermore National Laboratory (LLNL) to review technologies being evaluated for remediation in the Site 300 Pit 7 Complex and the process for selecting these technologies. Specifically, the project team presented the TAT with a core need to identify technically and economically practicable technologies and methods to stabilize, contain, or control the tritium and uranium in the source areas at the Pits 3 and 5 landfill area to prevent further releases of these contaminants to groundwater and the migration of tritiated and uranium-contaminated groundwater. The approaches and needs for the systems surrounding the landfills were also presented and discussed. With encouragement from the project team, the TAT expanded its focus to include additional site characterization, a water balance model, and computational models. The TAT was comprised of leading technical and regulatory experts from around the country and was assembled by SCFA's Lead Lab in response to a technical assistance request from John Ziagos, Project Manager for the Pit 7 Area (Technical Assistance Request: LLNL No.1). A list of the TAT members is included below and contact information the TAT members and site participants is in Appendix B. To familiarize the TAT assistance team with Pit 7 Complex issues, the project team gave a presentation outlining the site geology, contaminant hydrogeology, land-use issues, stakeholder concerns, regulatory requirements, groundwater flow and transport modeling efforts, pit source characterization efforts, and remedial options. Time for clarification and questions between the TAT and the site team was integrated into the presentation schedule. On the morning of the second day, the TAT reconvened with the site team and John Evans of the TAT presented information about a helium soil gas survey method that could potentially be used to locate and characterize tritium hot spots in Pits 3 and 5. Following the presentation, the TAT gathered independently to identify issues that are critical to remedy selection and to list questions or information gaps that the site is trying to resolve.

  9. EPAct Transportation Regulatory Activities

    SciTech Connect (OSTI)

    2011-11-21

    The U.S. Department of Energy's (DOE) Vehicle Technologies Program manages several transportation regulatory activities established by the Energy Policy Act of 1992 (EPAct), as amended by the Energy Conservation Reauthorization Act of 1998, EPAct 2005, and the Energy Independence and Security Act of 2007 (EISA).

  10. Project Financing Catalog of Services

    Broader source: Energy.gov [DOE]

    Document details the Federal Energy Management Program's catalog of technical assistance services it offers for federal agencies that want to use project funding mechanisms to finance energy efficiency and renewable energy projects.

  11. Project Management Plans | Department of Energy

    Energy Savers [EERE]

    Management Plans Project Management Plans The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. PDF icon Project Management Plans More Documents & Publications Project Management Plan Examples Project Management Plan Examples 1 - 80 Deactivation Management

  12. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    SciTech Connect (OSTI)

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites.

  13. Re: Regulatory Burden RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Burden RFI Re: Regulatory Burden RFI Hearth Patio & Barbecue Association comments on Regulatory Burden RFI PDF icon Re: Regulatory Burden RFI More Documents & Publications Department of Energy Request for Information: Reducing Regulatory Burden (Reply Comments) .Hearth, Patio & Barbecue Association's Comments on DOE's Regulatory Burden RFI Regulatory Reduction RFI, 76 Fed. Reg. 6123, February 3, 2011

  14. regulatory | OpenEI Community

    Open Energy Info (EERE)

    regulatory Home Graham7781's picture Submitted by Graham7781(2017) Super contributor 5 August, 2013 - 13:18 Geothermal Regulatory Roadmap featured on NREL Now geothermal NREL...

  15. Construction Project Safety and Health Plan RM

    Broader source: Energy.gov [DOE]

    The Construction Project Safety and Health Plan (CPSHP) Review Module is a tool that assists DOE federal project review teams in evaluating the technical sufficiency of the project readiness in...

  16. Project Execution Plan Review Module (RM)

    Broader source: Energy.gov [DOE]

    The Project Execution Plan (PEP) Review Module (RM) is a tool that assists DOE federal project review teams in evaluating the adequacy of the PEP development and maintenance for projects of any...

  17. Nuclear Regulatory Commission information digest

    SciTech Connect (OSTI)

    None,

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  18. Regulatory Requirements | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regulatory Requirements Executive Order 13423, Strengthening Federal Environment, Energy, and Transportation Management (January 26, 2007) and Executive Order 13514, Federal...

  19. FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) Form provides information on the federal assistance budget for construction projects, including calculation of the federal award needed to meet requirements, exclusions, and the proposed method for calculating the non-federal share. PDF icon FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) More Documents & Publications DOE F 4600.4 DOE F 4600.5 DOE F 4600.3

  20. Washington Coastal Zone Management Regulatory Handbook | Open...

    Open Energy Info (EERE)

    to library PermittingRegulatory Guidance - GuideHandbook: Washington Coastal Zone Management Regulatory HandbookPermittingRegulatory GuidanceGuideHandbook Author Washington...

  1. Regulatory Burden RFI | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    and in making its regulatory program more effective and less burdensome. Regulatory Burden RFI More Documents & Publications Regulatory Burden RFI from AHRI Air-Conditioning,...

  2. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. Army Project 181 Implementation Challenges in Deployment of an Energy Security Microgrid for Army Reserve Facilities located on the Former Fort Devens Army Base

    SciTech Connect (OSTI)

    Warwick, William M.

    2010-09-30

    This documents reports on a request for technical assistance from Fort Devens to analyze procurement of energy from nearby renewable generating resources.

  3. Mentors and Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mentors, Projects Mentors and Projects Bringing together top space science students with internationally recognized researchers at Los Alamos in an educational, collaborative atmosphere Contacts Director Misa Cowee Email Administrative Assistant Mary Wubbena Email Request more information Email Students work closely with their mentors, who are Laboratory scientists, on challenging research projects in the Space Weather Summer School. Projects are related to current research topics in space

  4. FVB Energy Inc. Technical Assistance Project

    SciTech Connect (OSTI)

    DeSteese, John G.

    2011-05-17

    The request made by FVB asked for advice and analysis regarding the value of recapturing the braking energy of trains operating on electric light rail transit systems. A specific request was to evaluate the concept of generating hydrogen by electrolysis. The hydrogen would, in turn, power fuel cells that could supply electric energy back into the system for train propulsion or, possibly, also to the grid. To allow quantitative assessment of the potential resource, analysis focused on operations of the SoundTransit light rail system in Seattle, Washington. An initial finding was that the full cycle efficiency of producing hydrogen as the medium for capturing and reusing train braking energy was quite low (< 20%) and, therefore, not likely to be economically attractive. As flywheel energy storage is commercially available, the balance of the analysis focused the feasibility of using this alternative on the SoundTransit system. It was found that an investment in a flywheel with a 25-kWh capacity of the type manufactured by Beacon Power Corporation (BPC) would show a positive 20-year net present value (NPV) based on the current frequency of train service. The economic attractiveness of this option would increase initially if green energy subsidies or rebates were applicable and, in the future, as the planned frequency of train service grows.

  5. DOE Financial Assistance Awards: Active Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Federal award o Alcoholic beverages o Entertainment o Meals in your home townnot traveling, including working lunches o Unauthorized airfare upgrades o Auto expenses, when ...

  6. Energy Design Assistance Project Tracker (EDAPT)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in 2012 and 2013 suggested market appetite for: * Broader adoption of EDAPT in other utility EDA programs * Extension of the web service to also manage retrofit incentive programs. ...

  7. Notice of Financial Assistance Award

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    F 4600.1# U.S. DEPARTMENT OF ENERGY (708) NOTICE OF FINANCIAL ASSISTANCE AWARD Under the authority of Public Law: Energy Independence and Security Act of 2007 1. PROJECT TITLE Viability Demonstration of Alternative Energy Systems in High Population Density Environments. 2. INSTRUMENT TYPE GRANT COOPERATIVE AGREEMENT 3. RECIPIENT (Name, address, zip code) 212 Degrees Consulting, LLC, 3960 Howard Hughes Parkway, Suite 500, Las Vegas, NV, 89169 4. INSTRUMENT NO. DE-FG36-10GO10589 5. AMENDMENT NO.

  8. Computer Assisted Virtual Environment - CAVE

    ScienceCinema (OSTI)

    Erickson, Phillip; Podgorney, Robert; Weingartner, Shawn; Whiting, Eric

    2014-06-09

    Research at the Center for Advanced Energy Studies is taking on another dimension with a 3-D device known as a Computer Assisted Virtual Environment. The CAVE uses projection to display high-end computer graphics on three walls and the floor. By wearing 3-D glasses to create depth perception and holding a wand to move and rotate images, users can delve into data.

  9. Microwave solidification project overview

    SciTech Connect (OSTI)

    Sprenger, G.

    1993-01-01

    The Rocky Flats Plant Microwave Solidification Project has application potential to the Mixed Waste Treatment Project and the The Mixed Waste Integrated Program. The technical areas being addressed include (1) waste destruction and stabilization; (2) final waste form; and (3) front-end waste handling and feed preparation. This document covers need for such a program; technology description; significance; regulatory requirements; and accomplishments to date. A list of significant reports published under this project is included.

  10. State Assistance for Recovery Act Related Electricity Policies: Awards |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Assistance for Recovery Act Related Electricity Policies: Awards State Assistance for Recovery Act Related Electricity Policies: Awards List of State Energy Policy Awards under the American Recovery and Reinvestment Act including State, Agency, and Recovery Act funding amounts. PDF icon State Energy Policy Awards 2011 11 09.pdf More Documents & Publications "List of Covered Electric Utilities" under the Public Utility Regulatory Policies Act of 1978 (PURPA)

  11. Energy Department Assistant Secretary Patricia Hoffman Addresses 2011 FERC

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reliability Technical Conference | Department of Energy Patricia Hoffman Addresses 2011 FERC Reliability Technical Conference Energy Department Assistant Secretary Patricia Hoffman Addresses 2011 FERC Reliability Technical Conference November 30, 2011 - 1:50pm Addthis WASHINGTON, D.C. - Department of Energy Assistant Secretary for Electricity Delivery and Energy Reliability Patricia Hoffman today addressed the 2011 Federal Energy Regulatory Commission technical conference in Washington, D.C.

  12. Electric Markets Technical Assistance Program: FY1999 Grant Descriptions and Contact Information

    Broader source: Energy.gov [DOE]

    Public Benefits and Distributed Generation Outreach Project The National Association of Regulatory Utility Commissioners (NARUC) will hold collaborative workshops with key stakeholders to build...

  13. MEMORANDUM FOR DISTRIBUTION FROM: CHARLES E. ANDERSON PRINCIPAL DEPUTY ASSISTANT SECRETARY FOR

    Energy Savers [EERE]

    - - Washington, DC 20585 April 4 , 2007 MEMORANDUM FOR DISTRIBUTION FROM: CHARLES E. ANDERSON PRINCIPAL DEPUTY ASSISTANT SECRETARY FOR ENVIRONMENTAL MANAGEMENT SUBJECT: Requirements to Coordinate Regulatory Negotiations with the Office of Regulatory Compliance In a memorandum dated December 28,2006, Assistant Secretary Rispoli announced the dissolution of the Office of Environmental Management (EM) Configuration Control Board and . the creation of a new EM Acquisition Advisory Board (EMAAB). In

  14. NREL: Technology Deployment - Federal Agency Technical Assistance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal Agency Technical Assistance NREL supports various federal agencies, including the U.S. Department of Energy (DOE), U.S. Department of Defense, and others by providing technical and project assistance, training, and resources to help meet and exceed energy and environmental targets. National Park Service From Prison Cells to Solar Cells: Alcatraz Island Goes Green U.S. Department of Energy As a DOE laboratory, NREL works hand-in-hand with the DOE to help shape, execute, and evaluate

  15. NREL: Technology Deployment - Solar Technical Assistance Team

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Leading Clean Energy Innovation About About NREL Mission & Programs Impact Leadership Community Visiting NREL Newsroom Contact Us Research Research Highlights Working With Us Working With Us Partnerships Facilities Licensing Commercialization Procurement Energy Education FAQs Contact Us Careers Careers Find a Job Your Career at NREL Interns & Postdocs State and Local Governments Technology Deployment Technical Assistance Project Map Through the Solar Technical Assistance Team (STAT),

  16. Financial Assistance Funding Opportunity Announcement | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Financial Assistance Funding Opportunity Announcement Financial Assistance Funding Opportunity Announcement AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 Projects under this FOA will be funded, in whole or in part, with funds appropriated by the American Recovery and Reinvestment Act of 2009, Pub. L. 111-5, (Recovery Act or Act). The Recovery Act's purposes are to stimulate the economy and to create and retain jobs. The Act gives preference to activities that can be started and

  17. Papers on the nuclear regulatory dilemma

    SciTech Connect (OSTI)

    Barkenbus, J.N.; Freeman, S.D.; Weinberg, A.M.

    1985-10-01

    The four papers contained in this report are titled: (1) From Prescriptive to Performance-Based Regulation of Nuclear Power; (2) Nuclear Regulatory Reform: A Technology-Forcing Approach; (3) Improving the Regulation of Nuclear Power; and (4) Science and Its Limits: The Regulators' Dilemma. These four papers investigate issues relating to the long-term regulation of nuclear energy. They were prepared as part of the Institute for Energy Analysis' project on Nuclear Regulation funded by a grant from the Mellon Foundation and a smaller grant by the MacArthur Foundation. Originally this work was to be supplemented by contributions from the Nuclear Regulatory Commission and from the Department of Energy. These contributions were not forthcoming, and as a result the scope of our investigations was more restricted than we had originally planned.

  18. Acting Assistant Secretary for DOE Office of Environmental Management

    Energy Savers [EERE]

    Visits Hanford - First Visit, Commemorates Completion of Major Recovery Act Project | Department of Energy Acting Assistant Secretary for DOE Office of Environmental Management Visits Hanford - First Visit, Commemorates Completion of Major Recovery Act Project Acting Assistant Secretary for DOE Office of Environmental Management Visits Hanford - First Visit, Commemorates Completion of Major Recovery Act Project August 11, 2011 - 12:00pm Addthis Media Contact Geoff Tyree, DOE

  19. Alaska Native Tribes Receive Technical Assistance for Local Clean Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects | Department of Energy Tribes Receive Technical Assistance for Local Clean Energy Projects Alaska Native Tribes Receive Technical Assistance for Local Clean Energy Projects May 24, 2012 - 5:47pm Addthis News Media Contact (202) 586-4940 WASHINGTON, D.C. - As part of the Obama Administration's commitments to reducing America's reliance on imported oil and protecting our nation's air and water, the U.S. Energy Department and the Denali Commission announced today that five Alaska

  20. Microsoft Word - Regulatory Burden RFI NEMA Comments regarding small motor regulations 17July2015 v5_1.docx

    Energy Savers [EERE]

    November 28, 2 July 17, 2015 VIA EMAIL TO: Regulatory.Review@hq.doe.gov Mr. Aaron Stevenson U.S. Department of Energy Office of the Assistant General Counsel Legislation, Regulation, and Energy Efficiency 1000 Independence Ave, SW Washington, DC 20585 Reducing Regulatory Burden: Request for Information (RFI) Dear Mr. Stevenson, The National Electrical Manufacturers Association (NEMA) appreciates the opportunity to provide the attached comments on the Request for Information to Reduce Regulatory

  1. By E-Mail Daniel Cohen Assistant General Counsel for Legislation, Regulation, and Energy Efficiency

    Energy Savers [EERE]

    June 19, 2012 By E-Mail Daniel Cohen Assistant General Counsel for Legislation, Regulation, and Energy Efficiency U.S. Department of Energy Office of the General Counsel 1000 Independence Ave., SW Washington, D.C. 20585 Regulatory.Review@hq.doe.gov Re: Regulatory Burden RFI Dear Mr. Cohen: The Association of Home Appliance Manufacturers (AHAM) respectfully submits the following comments to the Department of Energy (DOE) on its Regulatory Burden RFI, 77 Fed. Reg. 28518 (May 15, 2012). AHAM

  2. Regulatory Processes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appliance & Equipment Standards » Rulemakings & Notices » Regulatory Processes Regulatory Processes Beginning with the Energy Policy and Conservation Act of 1975, Congress has enacted a series of laws establishing federal appliance and equipment standards and the Department of Energy's (DOE) authority to develop, amend, and implement standards. To implement these laws, the Appliance and Equipment Standards program manages the regulatory processes described below. Standards Development

  3. Apply for Technical Assistance

    Broader source: Energy.gov [DOE]

    Application form for U.S. Department of Energy (DOE) Office of Indian Energy technical assistance for tribes.

  4. Weatherization Assistance Program

    Broader source: Energy.gov [DOE]

    This fact sheet provides an overview of the U.S. Department of Energys Weatherization Assistance Program.

  5. Get Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Get Assistance Get Assistance Technical assistance is provided through national laboratories, regional and national associations of state decision-makers, and federal government ...

  6. Funding for CSES Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Funding for CSES Projects Funding for CSES Projects High quality, cutting-edge science in the areas of astrophysics, space physics, solid planetary geoscience, and climate science. Contact Director Reiner Friedel (505) 665-1936 Email Professional Staff Assistant Georgia D. Sanchez (505) 665-0855 Email CSES Student and Postdoctoral Fellow Program Funding intervals are based on the federal fiscal year spanning the year from October 1 through September 30 of the following year. For all projects

  7. Northwest Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's Regional CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.

  8. Northeast Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's Regional CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.

  9. Pacific Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's Regional CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.

  10. Hydropower Projects

    SciTech Connect (OSTI)

    2015-04-02

    The Water Power Program helps industry harness this renewable, emissions-free resource to generate environmentally sustainable and cost-effective electricity. Through support for public, private, and nonprofit efforts, the Water Power Program promotes the development, demonstration, and deployment of advanced hydropower devices and pumped storage hydropower applications. These technologies help capture energy stored by diversionary structures, increase the efficiency of hydroelectric generation, and use excess grid energy to replenish storage reserves for use during periods of peak electricity demand. In addition, the Water Power Program works to assess the potential extractable energy from domestic water resources to assist industry and government in planning for our nation’s energy future. From FY 2008 to FY 2014, DOE’s Water Power Program announced awards totaling approximately $62.5 million to 33 projects focused on hydropower. Table 1 provides a brief description of these projects.

  11. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Energy Savers [EERE]

    Port Arthur LNG, LLC and Docket Nos. PF15-18-000 and Port Arthur Pipeline, LLC PF15-19-000 NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED PORT ARTHUR LIQUEFACTION PROJECT AND PORT ARTHUR PIPELINE PROJECT, REQUEST FOR COMMENTS ON ENVIRONMENTAL ISSUES, AND NOTICE OF PUBLIC SCOPING MEETINGS (June 24, 2015) The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental impact statement (EIS) that will discuss the environmental

  12. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Energy Savers [EERE]

    SUPPLEMENTAL NOTICE OF PUBLIC SCOPING MEETINGS FOR THE PLANNED ALASKA LNG PROJECT (October 20, 2015) The staff of the Federal Energy Regulatory Commission (FERC or Commission) will conduct additional public scoping meetings as part of their preparation of an environmental impact statement (EIS) for the Alaska LNG Project involving construction and operation of facilities by Alaska Gasline Development Corporation; BP Alaska LNG, LLC; Conoco Phillips Alaska LNG Company; ExxonMobil Alaska LNG, LLC;

  13. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Energy Savers [EERE]

    NOTICE OF PUBLIC SCOPING MEETINGS FOR THE PLANNED ALASKA LNG PROJECT (October 8, 2015) The staff of the Federal Energy Regulatory Commission (FERC or Commission) will conduct public scoping meetings as part of their preparation of an environmental impact statement (EIS) for the Alaska LNG Project involving construction and operation of facilities by Alaska Gasline Development Corporation; BP Alaska LNG, LLC; Conoco Phillips Alaska LNG Company; ExxonMobil Alaska LNG, LLC; and TransCanada Alaska

  14. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Energy Savers [EERE]

    Golden Pass Products, LLC and Docket Nos. CP14-517-000 Golden Pass Pipeline, LLC CP14-518-000 NOTICE OF AVAILABILITY OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED GOLDEN PASS LNG EXPORT PROJECT (March 25, 2016) The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a draft environmental impact statement (EIS) for the Golden Pass Liquefied Natural Gas (LNG) Export Project, proposed by Golden Pass Products, LLC and Golden Pass Pipeline, LLC

  15. Assistive Technology | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assistive Technology Assistive Technology Assistive technology word cloud. Assistive technology word cloud. The DOE Headquarters Accommodation Program was established to provide reasonable computer and related telecommunications accommodations for employees with disabilities. Since implementation of the Assistive Technologies program in 1993, accommodations have increased from an initial 26 to an approximately 700 individual accommodations. The Assistive Technologies program complies with

  16. Federal Energy Management Program Recovery Act Technical Assistance |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy About the Federal Energy Management Program » Federal Energy Management Program Recovery Act Technical Assistance Federal Energy Management Program Recovery Act Technical Assistance The American Recovery and Reinvestment Act of 2009 included funding for the Federal Energy Management Program (FEMP) to complete nearly 120 technical assistance projects. FEMP national laboratory teams and contractor service providers visited more than 80 federal sites located throughout the

  17. Information Technology Project Execution Model Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-04-16

    The guide was developed in support of DOE O 415.1 to assist IT Program and Project Managers in effectively managing and applying sound project management to IT.

  18. Information Technology Project Execution Model Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-07-17

    The guide was developed in support of DOE O 415.1 to assist IT Program and Project Managers in effectively managing and applying sound project management to IT. Does not cancel/supersede other directives.

  19. Quality Assurance Guide for Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-06-27

    This Guide provides information to assist U.S. Department of Energy (DOE) Federal Project Directors (FPD) and their Integrated Project Teams (IPT) in carrying out their Quality Assurance (QA)-related roles and responsibilities.

  20. EPA Clean Diesel Funding Assistance Program

    Broader source: Energy.gov [DOE]

    The U.S. Environmental Protection Agency (EPA) is accepting applications for the Clean Diesel Funding Assistance Program for projects to achieve significant reductions in diesel emissions in terms of tons of pollution produced by diesel engines and diesel emissions exposure, particularly from fleets operating at or servicing goods movement facilities located in areas designated as having poor air quality.

  1. EPA Tribal Clean Diesel Funding Assistance Program

    Broader source: Energy.gov [DOE]

    The U.S. Environmental Protection Agency (EPA) is accepting applications for the Tribal Clean Diesel Funding Assistance Program for tribal projects to achieve significant reductions in diesel emissions in terms of tons of pollution produced by diesel engines and diesel emissions exposure. Eligible entities include tribal governments.

  2. Regulatory Compliance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    These include National Environmental Policy Act (NEPA) Environmental Impact Statements and ... the development of effective compliance approaches and strategies, and can assist in ...

  3. FERC Handbook for Hydroelectric Project Licensing and 5 MW Exemptions...

    Open Energy Info (EERE)

    Handbook for Hydroelectric Project Licensing and 5 MW Exemptions from Licensing Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  4. FERC Hydroelectric Project Handbook for Filings other than Licenses...

    Open Energy Info (EERE)

    Hydroelectric Project Handbook for Filings other than Licenses and Exemptions Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  5. New Mexico Department of Fish and Game Powerline Project Guidelines...

    Open Energy Info (EERE)

    New Mexico Department of Fish and Game Powerline Project Guidelines Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Guide...

  6. Assistance Focus: Africa (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2014-12-01

    The Clean Energy Solutions Center Ask an Expert service connects governments seeking policy information and advice with one of more than 30 global policy experts who can provide reliable and unbiased quick-response advice and information. The service is available at no cost to government agency representatives from any country and the technical institutes assisting them. This publication presents summaries of assistance provided to African governments, including the benefits of that assistance.

  7. Tribal Energy Project Funding History

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy funds a wide variety of renewable energy and energy efficiency projects in an effort to assist tribes in realizing their energy visions.

  8. Radiological Assistance Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-04-10

    To establish Department of Energy (DOE) policy, procedures, authorities, and responsibilities for its Radiological Assistance Program. Canceled by DOE O 153.1.

  9. Commercialization Assistance Program | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The program specifically helps renewable energy and energy efficiency companies by providing free assistance or information to help small businesses with specific technology ...

  10. Emergency Assistance Center/Training Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CBL is operated as part of the Radiation Emergency Assistance Center/Training Site (REAC/TS) of the Oak Ridge Institute for Sci- ence and Education (ORISE). The reestablishment of the CBL was funded by the U.S. Department of Energy's (DOE) National Nuclear Security Administration (NA-40) and the Offce of Worker Safety and Health (EH-51), as well as the U.S. Nuclear Regulatory Commission. REAC/TS is recognized as the established leader in the management of medical accidents involving radiation,

  11. Project Reports for Oneida Tribe of Indians of Wisconsin- 1999 Project

    Broader source: Energy.gov [DOE]

    This project will assist in the purchase and installation of solar hot water and photovoltaic systems within the Oneida Nation Reservation.

  12. Regulatory and Permitting Information Desktop (RAPID) Toolkit (Poster)

    SciTech Connect (OSTI)

    Young, K. R.; Levine, A.

    2014-09-01

    The Regulatory and Permitting Information Desktop (RAPID) Toolkit combines the former Geothermal Regulatory Roadmap, National Environmental Policy Act (NEPA) Database, and other resources into a Web-based tool that gives the regulatory and utility-scale geothermal developer communities rapid and easy access to permitting information. RAPID currently comprises five tools - Permitting Atlas, Regulatory Roadmap, Resource Library, NEPA Database, and Best Practices. A beta release of an additional tool, the Permitting Wizard, is scheduled for late 2014. Because of the huge amount of information involved, RAPID was developed in a wiki platform to allow industry and regulatory agencies to maintain the content in the future so that it continues to provide relevant and accurate information to users. In 2014, the content was expanded to include regulatory requirements for utility-scale solar and bulk transmission development projects. Going forward, development of the RAPID Toolkit will focus on expanding the capabilities of current tools, developing additional tools, including additional technologies, and continuing to increase stakeholder involvement.

  13. EAC Recommendations Regarding Emerging and Alternative Regulatory...

    Broader source: Energy.gov (indexed) [DOE]

    of regulatoryutility business models. The paper includes a summary of regulatory model initiatives, current and emerging regulatory models, and emerging requirements, and...

  14. Small Business Regulatory Enforcement Fairness Act Download ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Small Business Regulatory Enforcement Fairness Act Download Small Business Regulatory Enforcement Fairness Act Download PDF icon Attachment-1-1-Non-Retaliation-Policy-Internal.pdf ...

  15. Policy and Regulatory Environment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soft Costs Policy and Regulatory Environment Policy and Regulatory Environment Photo of a man speaking while seated at a table with men and women surrounding him. A favorable ...

  16. REGULATORY PARTNERSHIP STATEMENT | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PARTNERSHIP STATEMENT REGULATORY PARTNERSHIP STATEMENT PDF icon RPS PDF.PDF More Documents & Publications REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT

  17. Paducah Site Regulatory Documents | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Documents Paducah Site Regulatory Documents PDF icon Paducah Site Federal Facility Agreement PDF icon Paducah 2015 Site Management Plan PDF icon Paducah Community ...

  18. OpenEI Community - regulatory

    Open Energy Info (EERE)

    Now http:en.openei.orgcommunitybloggeothermal-regulatory-roadmap-featured-nrel-now

    Navigating the complex system of federal and...

  19. Regulatory facility guide for Ohio

    SciTech Connect (OSTI)

    Anderson, S.S.; Bock, R.E.; Francis, M.W.; Gove, R.M.; Johnson, P.E.; Kovac, F.M.; Mynatt, J.O.; Rymer, A.C.

    1994-02-28

    The Regulatory Facility Guide (RFG) has been developed for the DOE and contractor facilities located in the state of Ohio. It provides detailed compilations of international, federal, and state transportation-related regulations applicable to shipments originating at destined to Ohio facilities. This RFG was developed as an additional resource tool for use both by traffic managers who must ensure that transportation operations are in full compliance with all applicable regulatory requirements and by oversight personnel who must verify compliance activities.

  20. Building Energy Codes Collaborative Technical Assistance for States |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Collaborative Technical Assistance for States Building Energy Codes Collaborative Technical Assistance for States Building Codes Project for the 2013 Building Technologies Office's Program Peer Review PDF icon bldgcodes01_wagner_040213.pdf More Documents & Publications State and Local Code Implementation: State Energy Officials - 2014 BTO Peer Review Southeast Energy Efficiency Alliance's Building Energy Codes Project Reducing Energy Demand in Buildings Through State

  1. Management of Selected Advanced Research Projects Agency-Energy Projects

    Energy Savers [EERE]

    Selected Advanced Research Projects Agency-Energy Projects OAS-M-14-08 August 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 August 6, 2014 MEMORANDUM FOR THE ACTING DIRECTOR FOR ADVANCED RESEARCH PROJECTS AGENCY-ENERGY FROM: George W. Collard Assistant Inspector General for Audits Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Management of Selected Advanced Research Projects

  2. PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and

    Office of Environmental Management (EM)

    Environmental Plan Examples Example 51 8.1 ENVIRONMENTAL STRATEGY A significant part of the strategy for maintaining compliance with environmental regulatory requirements during the PFP Stabilization and Deactivation Project is to apply the process described in the Tri-Party Agreement, Section 8.0, "Facility Decommissioning Process." The Section 8.0 process will allow the DOE to develop agreements with the State and Federal regulatory agencies facilitating timely stabilization of the

  3. Egress door opening assister

    DOE Patents [OSTI]

    Allison, Thomas L.

    2015-10-06

    A door opening spring assistance apparatus is set forth that will automatically apply a door opening assistance force using a combination of rods and coil springs. The release of the rods by the coil springs reduces the force required to set the door in motion.

  4. Structuring small projects

    SciTech Connect (OSTI)

    Pistole, C.O.

    1995-11-01

    One of the most difficult hurdles facing small project developers is obtaining financing. Many major banks and institutional investors are unwilling to become involved in projects valued at less than $25 million. To gain the interest of small project investors, developers will want to present a well-considered plan and an attractive rate of return. Waste-to-energy projects are one type that can offer diversified revenue sources that assure maximum profitability. The Ripe Touch Greenhouse project, a $14.5 million waste tire-to-energy facility in Colorado, provides a case study of how combining the strengths of the project partners can help gain community and regulatory acceptance and maximize profit opportunities.

  5. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. Army – Project 214 Analysis of Regulations Associated with Implementation of a Rocky Mountain Secure Smart-Grid

    SciTech Connect (OSTI)

    Warwick, William M.

    2010-09-30

    This document describes technical assistance provided by PNNL to further develop a smart grid technologies concept to provide a basis for policies and plans for the US Army. The effort was to analyze the potential to utilize emerging smart grid technologies along with indigenous renewable and other resources to meet the emergency and other power needs of Department of Defense facilities in Colorado and Wyoming.

  6. DOE Technical Assistance Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Projects awarded in 17 original partner cities and launched in Spring 2010 PROJECT ... Data Monitoring New York City Smart Solar City Data Acquisition System Demonstration ...

  7. Managing Large Capital Projects | Department of Energy

    Energy Savers [EERE]

    Managing Large Capital Projects Managing Large Capital Projects Presentation from the 2015 DOE National Cleanup Workshop by Ken Picha, Deputy Assistant Secretary for Tank Waste and Nuclear Material, Office of Environmental Management. PDF icon Managing Large Capital Projects More Documents & Publications Waste Treatment Plant Project Construction of Salt Waste Processing Facility (SWPF) 2013 Congressional Nuclear Cleanup Caucus Briefings

  8. Reducing Regulatory Burden | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    As part of its implementation of Executive Order 13563, ''Improving Regulation and Regulatory Review,'' PDF icon RRB_EO_13563.pdf More Documents & Publications Reducing Regulatory Burden; Retrospective Review Under E.O. 13563 Reducing Regulatory Burden EO 13563 Third RFI Fourth RFI Comment on Regulatory Review

  9. Regulatory Burden RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hearth & Home Technologies comments on Regulatory Burden RFI PDF icon Regulatory Burden RFI More Documents & Publications Department of Energy Request for Information: Reducing Regulatory Burden (Reply Comments) Re: Regulatory Burden RFI RegReview_ReplyComments_Lennox_Hearth_Products.PDF

  10. Acquisition & Financial Assistance Rules Status | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition & Financial Assistance Rules Status Acquisition & Financial Assistance Rules Status Subscribe to Acquisition & Financial Assistance Rules Status Updates PDF icon ...

  11. Occupational Medicine - Assistant PIA, Idaho National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Medicine - Assistant PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National ...

  12. Occupational Medicine - Assistant PIA, Idaho National Laboratory...

    Energy Savers [EERE]

    Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho...

  13. Financial Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assistance Financial Assistance Financial Assistance Regulations Governmentwide Uniform Regulations for Financial Assistance (Omnicircular; Issued 12/26/2013) DOE Financial Assistance Regulations (which Implement and Amend the Omnicircular; Issued 12/19/2014) New Restrictions on Lobbying, 10 CFR Part 601 Epidemiology & Other Health Studies, 10 CFR Part 602 Technology Investment Agreements, 10 CFR 603 Office of Science Financial Assistance Program, 10 CFR Part 605 Previous Financial

  14. Get Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Get Assistance Get Assistance Technical assistance is provided through national laboratories, regional and national associations of state decision-makers, and federal government staff. OE provides technical assistance in response to requests from eligible entities. Requests for assistance can be submitted directly to the OE program contacts. Requests may also be made through a national or regional organization (see examples below). Assistance from OE to states, regions, and Tribes can range from

  15. DOE Grand Junction Projects Office Edgemont LTSP

    Office of Legacy Management (LM)

    DOE Grand Junction Projects Office Edgemont LTSP June 1996 Page ii Contents Page 1.0 Introduction ....................................................................................................................................... 1 1.1 Purpose ..................................................................................................................................... 1 1.2 Legal and Regulatory Requirements

  16. Weatherization Assistance Program (WAP)

    Broader source: Energy.gov [DOE]

    Through the Weatherization Assistance Program (WAP), the U.S. Department of Energy (DOE) issues grants to states, territories, and some Indian tribes to improve the energy efficiency of low-income...

  17. Foreign National Assistant

    Broader source: Energy.gov [DOE]

    This position may be filled at either Morgantown, WV or Pittsburgh, PA. A successful candidate in this position will assist employees and program managers within the Security and Emergency Response...

  18. U.S. Department of Energy Project Definition Rating Index Guide...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, U.S. Department of Energy Project Definition Rating Index Guide by Ruben Sanchez Functional areas: Project Management This Guide assists individuals and teams involved in...

  19. Gina Pearson Assistant Administrator

    Gasoline and Diesel Fuel Update (EIA)

    Gina Pearson Assistant Administrator for Communications Duties Gina Pearson is the Assistant Administrator (AA) for Communications, and in this capacity provides leadership and direction to conduct the U.S. Energy Information Administration's comprehensive communications program for diverse external customer groups and agency employees. The AA for Communications is responsible for Agency communications policies and standards, the www.eia.gov website, press and media rela- tions, marketing and

  20. Regulatory approaches for addressing dissolved oxygen concerns at hydropower facilities

    SciTech Connect (OSTI)

    Peterson, Mark J.; Cada, Glenn F.; Sale, Michael J.; Eddlemon, Gerald K.

    2003-03-01

    Low dissolved oxygen (DO) concentrations are a common water quality problem downstream of hydropower facilities. At some facilities, structural improvements (e.g. installation of weir dams or aerating turbines) or operational changes (e.g., spilling water over the dam) can be made to improve DO levels. In other cases, structural and operational approaches are too costly for the project to implement or are likely to be of limited effectiveness. Despite improvements in overall water quality below dams in recent years, many hydropower projects are unable to meet state water quality standards for DO. Regulatory agencies in the U.S. are considering or implementing dramatic changes in their approach to protecting the quality of the Nations waters. New policies and initiatives have emphasized flexibility, increased collaboration and shared responsibility among all parties, and market-based, economic incentives. The use of new regulatory approaches may now be a viable option for addressing the DO problem at some hydropower facilities. This report summarizes some of the regulatory-related options available to hydropower projects, including negotiation of site-specific water quality criteria, use of biological monitoring, watershed-based strategies for the management of water quality, and watershed-based trading. Key decision points center on the health of the local biological communities and whether there are contributing impacts (i.e., other sources of low DO effluents) in the watershed. If the biological communities downstream of the hydropower project are healthy, negotiation for site-specific water quality standards or biocriteria (discharge performance criteria based on characteristics of the aquatic biota) might be pursued. If there are other effluent dischargers in the watershed that contribute to low DO problems, watershed-scale strategies and effluent trading may be effective. This report examines the value of regulatory approaches by reviewing their use in other

  1. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Energy Savers [EERE]

    Corporation Docket No. PF14-21-000 BP Alaska LNG, LLC Conoco Phillips Alaska LNG Company ExxonMobil Alaska LNG, LLC TransCanada Alaska Midstream, LP NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED ALASKA LNG PROJECT AND REQUEST FOR COMMENTS ON ENVIRONMENTAL ISSUES (March 4, 2015) The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental impact statement (EIS) that will discuss the environmental impacts of the Alaska LNG

  2. Regulatory Impacts for Renewable Energy Projects on Indian Lands Webinar

    Broader source: Energy.gov [DOE]

    This webinar will describe the latest developments surrounding the HEARTH Act and discuss how it can help tribal communities create a bright future. This webinar is held from 11:00 a.m. to 12:30 p.m. Mountain Standard Time on June 24, 2015.

  3. Tribal Energy Project Development Process | Department of Energy

    Energy Savers [EERE]

    Technical Assistance » On-Request Technical Assistance » Tribal Energy Project Development Process Tribal Energy Project Development Process The DOE Office of Indian Energy has developed the following five-step project development and financing process that focuses on key decision points and outlines a chronological path to smart renewable energy development. Tribes can get help with each step by applying for available federal grant, loan, and technical assistance programs. Tribal renewable

  4. 4.1 PROJECT MANAGER ROLE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4-1 4.0 AGREEMENT MANAGEMENT 4.1 PROJECT MANAGER ROLE The DOE and the lead regulatory agency(ies) (see Section 5.6 for discussion of lead regulatory agency) shall each designate an individual as a project manager for each operable unit, TSD group/unit or specific milestone to be completed under this Agreement. Project managers will only be identified for those areas where effort is ongoing or planned in the near future. A listing of currently assigned project managers shall be maintained and

  5. Knowledge Management Initiatives Used to Maintain Regulatory Expertise in Transportation and Storage of Radioactive Materials - 12177

    SciTech Connect (OSTI)

    Lindsay, Haile; Garcia-Santos, Norma; Saverot, Pierre; Day, Neil; Gambone Rodriguez, Kimberly; Cruz, Luis; Sotomayor-Rivera, Alexis; Vechioli, Lucieann; Vera, John; Pstrak, David

    2012-07-01

    The U.S. Nuclear Regulatory Commission (NRC) was established in 1974 with the mission to license and regulate the civilian use of nuclear materials for commercial, industrial, academic, and medical uses in order to protect public health and safety, and the environment, and promote the common defense and security. Currently, approximately half (∼49%) of the workforce at the NRC has been with the Agency for less than six years. As part of the Agency's mission, the NRC has partial responsibility for the oversight of the transportation and storage of radioactive materials. The NRC has experienced a significant level of expertise leaving the Agency due to staff attrition. Factors that contribute to this attrition include retirement of the experienced nuclear workforce and mobility of staff within or outside the Agency. Several knowledge management (KM) initiatives have been implemented within the Agency, with one of them including the formation of a Division of Spent Fuel Storage and Transportation (SFST) KM team. The team, which was formed in the fall of 2008, facilitates capturing, transferring, and documenting regulatory knowledge for staff to effectively perform their safety oversight of transportation and storage of radioactive materials, regulated under Title 10 of the Code of Federal Regulations (10 CFR) Part 71 and Part 72. In terms of KM, the SFST goal is to share critical information among the staff to reduce the impact from staff's mobility and attrition. KM strategies in place to achieve this goal are: (1) development of communities of practice (CoP) (SFST Qualification Journal and the Packaging and Storing Radioactive Material) in the on-line NRC Knowledge Center (NKC); (2) implementation of a SFST seminar program where the seminars are recorded and placed in the Agency's repository, Agency-wide Documents Access and Management System (ADAMS); (3) meeting of technical discipline group programs to share knowledge within specialty areas; (4) development of written guidance to capture 'administrative and technical' knowledge (e.g., office instructions (OIs), generic communications (e.g., bulletins, generic letters, regulatory issue summary), standard review plans (SRPs), interim staff guidance (ISGs)); (5) use of mentoring strategies for experienced staff to train new staff members; (6) use of Microsoft SharePoint portals in capturing, transferring, and documenting knowledge for staff across the Division from Division management and administrative assistants to the project managers, inspectors, and technical reviewers; and (7) development and implementation of a Division KM Plan. A discussion and description of the successes and challenges of implementing these KM strategies at the NRC/SFST will be provided. (authors)

  6. Technical Assistance to Developers

    SciTech Connect (OSTI)

    Rockward, Tommy; Borup, Rodney L.; Garzon, Fernando H.; Mukundan, Rangachary; Spernjak, Dusan

    2012-07-17

    This task supports the allowance of technical assistance to fuel-cell component and system developers as directed by the DOE. This task includes testing of novel materials and participation in the further development and validation of single cell test protocols. This task also covers technical assistance to DOE Working Groups, the U.S. Council for Automotive Research (USCAR) and the USCAR/DOE Driving Research and Innovation for Vehicle efficiency and Energy sustainability (U.S. Drive) Fuel Cell Technology Team. Assistance includes technical validation of new fuel cell materials and methods, single cell fuel cell testing to support the development of targets and test protocols, and regular advisory participation in other working groups and reviews. This assistance is made available to PEM fuel cell developers by request and DOE Approval. The objectives are to: (1) Support technically, as directed by DOE, fuel cell component and system developers; (2) Assess fuel cell materials and components and give feedback to developers; (3) Assist the DOE Durability Working Group with the development of various new material durability Testing protocols; and (4) Provide support to the U.S. Council for Automotive Research (USCAR) and the USCAR/DOE Fuel Cell Technology Team. FY2012 specific technical objectives are: (1) Evaluate novel MPL materials; (2) Develop of startup/ shutdown protocol; (3) Test the impact of hydrophobic treatment on graphite bi-polar plates; (4) Perform complete diagnostics on metal bi-polar plates for corrosion; and (5) Participate and lead efforts in the DOE Working Groups.

  7. Legal, regulatory & institutional issues facing distributed resources development

    SciTech Connect (OSTI)

    1996-10-01

    This report describes legal, regulatory, and institutional considerations likely to shape the development and deployment of distributed resources. It is based on research co-sponsored by the National Renewable Energy Laboratory (NREL) and four investor-owned utilities (Central & South West Services, Cinergy Corp., Florida Power Corporation, and San Diego Gas & Electric Company). The research was performed between August 1995 and March 1996 by a team of four consulting firms experienced in energy and utility law, regulation, and economics. It is the survey phase of a project known as the Distributed Resources Institutional Analysis Project.

  8. Technical Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Assistance Technical Assistance Photo courtesy of Dennis Schroeder, NREL 18022 Photo courtesy of Dennis Schroeder, NREL 18022 The U.S. Department of Energy offers technical assistance supporting energy efficiency and renewable energy. This technical assistance can include direct advice on issues or goals, tools and maps, and training. Some select technical assistance offerings are listed below. For States and Communities The State and Local Solution Center provides states and

  9. ORISE: Applied health physics projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Applied health physics projects The Oak Ridge Institute for Science and Education (ORISE) provides applied health physics services to government agencies needing technical support for decommissioning projects. Whether the need is assistance with the development of technical basis documents or advice on how to identify, measure and assess the presence of radiological materials, ORISE can help determine the best course for an environmental cleanup project. Our key areas of expertise include fuel

  10. Mongolia Renewable Energy and Rural Electricity Access Project...

    Open Energy Info (EERE)

    legislation for grid-connected renewable energy systems; and (a) support for project management, monitoring and evaluation, and assistance in the institutional development of...

  11. EM Employees Engage in Interactive Workshop on Contract, Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... "Contracts we have in place will really allow us to do this work, and with the talent we ... Approach Benefitting Taxpayers EM Acquisition and Project Management Deputy Assistant ...

  12. Federal Energy Management Program Recovery Act Project Stories

    Broader source: Energy.gov [DOE]

    Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies.

  13. PEP TALK "Policy - EVMS - PARS" Update, Mel Frank, Chief, Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the 2016 Project Management Workshop, features and capabilities of the new PM Website, EVMS Roadside Assist visits, EVMS Training Snippets, PMCDP classroom and online training, ...

  14. Tanzania Energy Development and Access Expansion Project | Open...

    Open Energy Info (EERE)

    energy access expansion. The project is consistent with the latest Joint Assistance Strategy (2007-2010) by specifically supporting the goals of the Government's National...

  15. Vehicle Technologies Office Merit Review 2014: EV Project: Solar...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vehicle Technologies Office Merit Review 2014: EV Project: Solar-Assisted Charging Demo Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells ...

  16. Delegation of Approval Authority for Integrated Project Team...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management Delegate: J. E. Surash, Deputy Assistant Secretary for Acquisition and Project Management Status: Current Effective Date: Mar 27, 2012 Re-delegation Allowed: No...

  17. Oneida Tribe of Indians of Wisconsin- 1999 Project

    Broader source: Energy.gov [DOE]

    This project will assist in the purchase and installation of solar hot water and photovoltaic systems within the Oneida Nation Reservation.

  18. Mid-Atlantic Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs.

  19. Energy Savings Performance Contract ENABLE for Federal Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEMP is authorized by statute to establish appropriate procedures and methods for use by ... FEMP can provide agencies with project assistance, guidance, and training to help them ...

  20. Radiation Embrittlement Archive Project

    SciTech Connect (OSTI)

    Klasky, Hilda B; Bass, Bennett Richard; Williams, Paul T; Phillips, Rick; Erickson, Marjorie A; Kirk, Mark T; Stevens, Gary L

    2013-01-01

    The Radiation Embrittlement Archive Project (REAP), which is being conducted by the Probabilistic Integrity Safety Assessment (PISA) Program at Oak Ridge National Laboratory under funding from the U.S. Nuclear Regulatory Commission s (NRC) Office of Nuclear Regulatory Research, aims to provide an archival source of information about the effect of neutron radiation on the properties of reactor pressure vessel (RPV) steels. Specifically, this project is an effort to create an Internet-accessible RPV steel embrittlement database. The project s website, https://reap.ornl.gov, provides information in two forms: (1) a document archive with surveillance capsule(s) reports and related technical reports, in PDF format, for the 104 commercial nuclear power plants (NPPs) in the United States, with similar reports from other countries; and (2) a relational database archive with detailed information extracted from the reports. The REAP project focuses on data collected from surveillance capsule programs for light-water moderated, nuclear power reactor vessels operated in the United States, including data on Charpy V-notch energy testing results, tensile properties, composition, exposure temperatures, neutron flux (rate of irradiation damage), and fluence, (Fast Neutron Fluence a cumulative measure of irradiation for E>1 MeV). Additionally, REAP contains data from surveillance programs conducted in other countries. REAP is presently being extended to focus on embrittlement data analysis, as well. This paper summarizes the current status of the REAP database and highlights opportunities to access the data and to participate in the project.

  1. 5.0 INTERFACE OF REGULATORY AUTHORITIES

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5-1 5.0 INTERFACE OF REGULATORY AUTHORITIES 5.1 REGULATORY PROGRAMS The RCRA, CERCLA, and State Dangerous Waste Program overlap in many areas. In general, CERCLA was created by...

  2. Regulatory Review Comment Section | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Radiation Protection of the Public and the Environment » Regulatory Review Comment Section Regulatory Review Comment Section DOE Comments on Radiation Protection (Atomic Energy Act) DOE Comments on Radioactive Waste

  3. FPCC Regulatory Barriers Submittal | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FPCC Regulatory Barriers Submittal FPCC Regulatory Barriers Submittal The Federal Performance Contracting Coalition (FPCC) appreciates the opportunity to comment on reducing regulatory burdens on the Federal government, specifically as they pertain to federal energy actions. PDF icon FPCC_Reg_Barriers_Submittal.pdf More Documents & Publications NAESCO Comments on Reducing Regulatory Burden RFI Final Practical Guide to Savings and Payments in FEMP ESPC Task Orders How Energy Savings

  4. Nuclear Regulatory Commission 1989 Information Digest

    SciTech Connect (OSTI)

    None,

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  5. Nuclear Safety Regulatory Framework | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Safety Regulatory Framework Nuclear Safety Regulatory Framework February 2012 Presentation that outlines the rules, policies and orders that comprise the Department of Energy Nuclear Safety Regulatory Framework. PDF icon Nuclear Safety Regulatory Framework More Documents & Publications Summary Pamphlet, Nuclear Safety at the Department of Energy Notice of Violation, UChicago Argonne, LLC - WEA-2009-04 Independent Oversight Assessment, Waste Treatment and Immobilization Plant -

  6. Portsmouth Regulatory Approach | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Approach Portsmouth Regulatory Approach The regulatory framework for the Decontamination & Decommissioning program requires five major decisions with public input, as outlined in the Director’s Final Findings and Orders. The regulatory framework for the Decontamination & Decommissioning program requires five major decisions with public input, as outlined in the Director's Final Findings and Orders. Environmental Remediation Environmental remediation, or the cleanup of

  7. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1990-08-15

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  8. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1990-04-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  9. Jefferson Lab Project Management & Integrated Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Kelly K. Krug, Project Management Office Manager (757) 269-6044, krug@jlab.org Christine Fragapane, Project Management Executive Assistant (757) 269-7502, chummel@jlab.org Matrixed: Claus H. Rode, 12 GeV Upgrade Project Manager (757) 269-7511, rode@jlab.org Program Development & Planning The Program Development function of Project Management Office serves three main purposes: 1. Monitor EVMS processes on Jefferson Lab projects and conducting an annual EVMS surveillance review to ensure the

  10. Geothermal Regulatory Roadmap | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulatory Roadmap Geothermal Regulatory Roadmap Geothermal Regulatory Roadmap presentation at the April 2013 peer review meeting held in Denver, Colorado. PDF icon grr_peer2013.pdf More Documents & Publications track 1: systems analysis | geothermal 2015 peer review Geothermal Technologies Program Annual Peer Review Presentation By Doug Hollett Validation of Innovation Exploration Technologies for Newberry Volcano

  11. Approach of Czech regulatory body to LBB

    SciTech Connect (OSTI)

    Tendera, P.

    1997-04-01

    At present there are two NPPs equipped with PWR units in Czech Republic. The Dukovany, NPP is about ten years in operation (four units 440 MW - WWBFL model 213) and Tomelin NPP is under construction (two units 1000 MW - WWER model 320). Both NPPs were built to Soviet design and according to Soviet regulations and standards but most of equipment for primary circuits was supplied by home manufacturers. The objective of the Czech LBB program is to prove the LBB status of the primary piping systems of there NPPs and the LBB concept is a part of strategy to meet western style safety standards. The reason for the Czech LBB project is a lack of some standard safety Facilities too. For both Dukovany and Tomelin NPPs a full LBB analysis should be carried out. The application of LBB to the piping system should be also a cost effective means to avoid installations of pipe whip restraints and jet shields. The Czech regulatory body issued non-mandatory requirement, {open_quotes}Leak Before Break{close_quotes} which is in compliance with national legal documents and which is based on the US NRC Regulatory Procedures and US standards (ASMF CODE, ANSI). The requirement has been published in the document {open_quotes}Safety of Nuclear Facilities{close_quotes} No 1/1991 as {open_quotes}Requirements on the Content and Format of Safety Reports and their Supplements{close_quote} and consist of two parts (1) procedure for obtaining proof of evidence {open_quotes}Leak Before Break{close_quotes} (2) leak detection systems for the pressurized reactor primary circuit. At present some changes concerning both parts of the above document will be introduced. The reasons for this modifications will be presented.

  12. Approach for Czech regulatory body to LBB

    SciTech Connect (OSTI)

    Tendera, P.

    1997-04-01

    At present there are two NPPs equipped with PWR units in Czech Republic. The Dukovany NPP is about ten years in operation (four units 440 MW - WWER model 213) and Temelin NPP is under construction (two units 1000 MW-WWER model 320). Both NPPs were built to Soviet design and according to Soviet regulations and standards but most of equipment for primary circuits was supplied by home manufactures. The objective for the Czech LBB programme is to prove the LBB status of the primary piping systems of these NPPs and the LBB concept is a part of strategy to meet western style safety standards. The reason for the Czech LBB project is a lack of some standard safety facilities, too. For both Dukovany and Temolin NPPs a full LBB analysis should be carried out. The application of LBB to the piping system should be also a cost effective means to avoid installations of pipe whip restraints and jet shields. The Czech regulatory body issued non-mandatory requirement {open_quotes}Leak Before Break{close_quotes} which is in compliance with national legal documents and which is based on the US NRC Regulatory Procedures and US standards (ASME, CODE, ANSI). The requirement has been published in the document {open_quotes}Safety of Nuclear Facilities{close_quotes} No. 1/1991 as {open_quotes}Requirements on the Content and Format of Safety Reports and their Supplements{close_quotes} and consists of two parts (1) procedure for obtaining proof of evidence {open_quotes}Leak Before Break{close_quotes} (2) leak detection systems for the pressurized reactor primary circuit. At present some changes concerning both parts of the above document will be introduced. The reasons for this modifications will be presented.

  13. Office of Security Assistance

    Broader source: Energy.gov [DOE]

    The Office of Security Assistance manages the Technology Deployment Program to improve the security posture of the Department of Energy and the protection of its assets and facilities through the deployment of new safeguards and security technologies and development of advanced technologies that reduce operating costs, save protective force lives, and improve security effectiveness.

  14. Weatherization Pilot Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pilot Projects Weatherization Pilot Projects The U.S. Department of Energy (DOE) Weatherization Assistance Program (WAP) supported two projects that allowed local weatherization agencies to experiment with including new and innovative materials and energy efficiency technologies provided to weatherization clients. Sustainable Energy Resources for Consumers Weatherization Innovation Pilot Program Sustainable Energy Resources for Consumers Under the Sustainable Energy Resources for Consumers

  15. Final Report -Regulatory and Utility Solutions to Advance SunShot

    Broader source: Energy.gov (indexed) [DOE]

    Initiative Goals | Department of Energy Interstate Renewable Energy Council (IREC) Location: Latham, NY Subprogram: Soft Costs Funding Program: Solar Projects to Reduce Market Barriers and Non-Hardware Balance of System Costs IREC's work over the past three years under the United States Department of Energy SunShot award "Regulatory and Utility Solutions to Advance SunShot Initiative Goals" has significantly expanded state solar markets by removing regulatory policy barriers to

  16. Contacts for the Assistant General Counsel for Contractor Human Resources |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Contractor Human Resources Contacts for the Assistant General Counsel for Contractor Human Resources Jean S. Stucky, Assistant General Counsel for Contractor Human Resources 202-586-7532 jean.stucky@hq.doe.gov Eva M. Auman, Attorney-Adviser 202-287-5630 Grant Programs Legacy/Closure Sites Hanford Moab National Energy Testing Laboratory National Renewable Energy Laboratory Pacific Northwest National Laboratory Waste Isolation Pilot Project (Carlsbad Field Office) Thomas

  17. Technical Assistance to ISO's and Grid Operators For Loads Providing

    Energy Savers [EERE]

    Ancillary Services To Enhance Grid Reliability | Department of Energy Technical Assistance to ISO's and Grid Operators For Loads Providing Ancillary Services To Enhance Grid Reliability Technical Assistance to ISO's and Grid Operators For Loads Providing Ancillary Services To Enhance Grid Reliability Project demonstrates and promotes the use of responsive load to provide ancillary services; helps ISOsand grid operators understand the resource and how best to apply it. PDF icon Technical

  18. Recovery Act: State Assistance for Recovery Act Related Electricity

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policies | Department of Energy Information Center » Recovery Act » Recovery Act: State Assistance for Recovery Act Related Electricity Policies Recovery Act: State Assistance for Recovery Act Related Electricity Policies $44 Million for State Public Utility Commissions State public utility commissions (PUCs), which regulate and oversee electricity projects in their states, will be receiving more than $44.2 million in Recovery Act funding to hire new staff and retrain existing employees to

  19. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. General Services Administration Project 195 John Seiberling Federal Office Building and U.S. Courthouse, Akron, Ohio

    SciTech Connect (OSTI)

    Arends, J.; Sandusky, William F.

    2010-05-28

    This report documents the findings from an onsite audit of the John Seiberling Federal building located in Akron, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would reduce in either electrical and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

  20. Energy Efficiency Project Development

    SciTech Connect (OSTI)

    IUEP

    2004-03-01

    The International Utility Efficiency Partnerships, Inc. (IUEP) has been a leader among the industry groups that have supported voluntary initiatives to promote international energy efficiency projects and address global climate change. The IUEP maintains its leadership by both supporting international greenhouse gas (GHG) reduction projects under the auspices of the U.S. Department of Energy (DOE) and by partnering with U.S. and international organizations to develop and implement strategies and specific energy efficiency projects. The goals of the IUEP program are to (1) provide a way for U.S. industry to maintain a leadership role in international energy efficiency infrastructure projects; (2) identify international energy project development opportunities to continue its leadership in supporting voluntary market-based mechanisms to reduce GHG emissions; and (3) demonstrate private sector commitment to voluntary approaches to global climate issues. The IUEP is dedicated to identifying, promoting, managing, and assisting in the registration of international energy efficiency projects that result in demonstrated voluntary reductions of GHG emissions. This Final Technical Report summarizes the IUEP's work in identifying, promoting, managing, and assisting in development of these projects and IUEP's effort in creating international cooperative partnerships to support project development activities that develop and deploy technologies that (1) increase efficiency in the production, delivery and use of energy; (2) increase the use of cleaner, low-carbon fuels in processing products; and (3) capture/sequester carbon gases from energy systems. Through international cooperative efforts, the IUEP intends to strengthen partnerships for energy technology innovation and demonstration projects capable of providing cleaner energy in a cost-effective manner. As detailed in this report, the IUEP met program objectives and goals during the reporting period January 1, 2001 through December 31, 2002. At the request of the DOE, we have also included in this report additional activities during the reporting period January, 1999 through January, 2001. This additional information had been reported earlier in the Final Technical Reports that summarized activities undertaken in those earlier periods.

  1. DOE Technical Assistance Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...SITINGlocal.shtml - Pace Law Library: http:libraryguides.law.pace.educontent.php?pid47949&sid1022374 - DSIRE: http:www.dsireusa.org 27 | Community Renewables Projects ...

  2. Renewable Energy & Energy Efficiency Projects: Loan Guarantee Solicitation

    Broader source: Energy.gov [DOE]

    Plenary III: Project Finance and Investment Renewable Energy & Energy Efficiency Projects: Loan Guarantee Solicitation Valri Lightner, Assistant Director, Technical Division at Loan Program Office, U.S. Department of Energy

  3. PSERC Current Projects Overview

    Energy Savers [EERE]

    DE-OE0000652 Srivastava, WSU Collaborative educational program on synchrophasor applications for the smart electric grid 1 Project Summary 1. Title: Collaborative educational program on synchrophasor applications for the smart electric grid 2. Principal Investigators (PI): Prof. Anurag K Srivastava, Prof. Mani Venkatasubramaniam, Prof. Dave Bakken, and Prof. Chen-Ching Liu 3. University: Washington State University 4. Contact information: Anurag K Srivastava Assistant Professor, School of

  4. Midwest Region Combined Heat and Power Projects

    Broader source: Energy.gov [DOE]

    DOE's CHP Technical Assistance Partnerships (CHP TAPs) have compiled a select number of combined heat and power (CHP) project profiles, which are available as Adobe Acrobat PDFs. 

  5. Protocol, Security Assistance- January 2007

    Broader source: Energy.gov [DOE]

    Provide timely technical assistance and system support to Field and HQ Elements to enhance site safeguards and security.

  6. Integrated Analysis of Protein Complexes and Regulatory Networks...

    Office of Scientific and Technical Information (OSTI)

    and Regulatory Networks Involved in Anaerobic Energy Metabolism of Shewanella ... and Regulatory Networks Involved in Anaerobic Energy Metabolism of Shewanella ...

  7. About the Guidelines for Home Energy Professionals Project | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Weatherization Assistance Program » Guidelines for Home Energy Professionals » About the Guidelines for Home Energy Professionals Project About the Guidelines for Home Energy Professionals Project The Guidelines for Home Energy Professionals project supports the development of an effective and highly skilled weatherization workforce in the residential energy upgrade industry. The project assists industry by defining quality work through standard work specifications, a rigorous

  8. Low Income Home Energy Assistance Program (LIHEAP)

    Broader source: Energy.gov [DOE]

    The Low Income Home Energy Assistance Program (LIHEAP) provides resources to assist families with energy costs. This federally funded assistance helps in managing costs associated with:

  9. Technical Assistance: Frequently Asked Questions | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Frequently Asked Questions Technical Assistance: Frequently Asked Questions What types of technical assistance does DOE offer? Technical assistance is provided through national ...

  10. DOE Offers Technical Assistance on EPA Rules Implementation to States and the Utility Industry

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) is offering technical assistance to state public utility commissioners, generation owner/operators, and utilities on implementing the new and pending EPA air rules affecting the electric utility industry. Examples of typical assistance include technical information on cost and performance of the various power plant pollution retrofit control technologies; technical information on generation, demand-side or transmission alternatives for any replacement power needed for retiring generating units; and assistance to public utility commissions regarding any regulatory evaluations or approvals they may have to make on utility compliance strategies.

  11. Nuclear regulatory legislation, 104th Congress. Volume 2, No. 4

    SciTech Connect (OSTI)

    1997-12-01

    This document is the second of two volumes compiling statutes and material pertaining to nuclear regulatory legislation through the 104th Congress, 2nd Session. It is intended for use as a U.S. Nuclear Regulatory Commission (NRC) internal resource document. Legislative information reproduced in this document includes portions of the Paperwork Reduction Act, various acts pertaining to low-level radioactive waste, the Clean Air Act, the Federal Water Pollution Control Act, the National Environmental Policy Act, the Hazardous Materials Transportation Act, the West Valley Demonstration Project Act, Nuclear Non-Proliferation and Export Licensing Statutes, and selected treaties, agreements, and executive orders. Other information provided pertains to Commissioner tenure, NRC appropriations, the Chief Financial Officers Act, information technology management reform, and Federal civil penalties.

  12. Emission Market Opportunities for Federal Energy Projects

    SciTech Connect (OSTI)

    Vimmerstedt, L.; Shah, C.

    2005-06-01

    This document assists federal agencies in incorporating emissions market opportunities in their energy projects, including emission reduction credit markets and cap and trade. It looks at how potential emissions costs/revenues can be incorporated into project proposals, how groups can apply for emissions allowances, and how agencies can sell emissions allowances and receive the financial benefit. The fact sheet also outlines how FEMP can provide assistance throughout the process.

  13. Criteria for determining the effectiveness of utility-initiated energy assistance

    SciTech Connect (OSTI)

    Costello, Ken

    2010-04-15

    The affordability of electricity and natural gas to all households requires some form of energy assistance, funded by utilities and their customers. Good regulation demands that EA initiatives have favorable benefit-cost ratios. Regulators should strive to assure that each dollar expended returns the highest possible dividend and that EA initiatives do not seriously impede other regulatory objectives. (author)

  14. Redesignation Order No. 00-09.01 to the Assistant Secretary for Environmental Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-05-12

    Redesignation of the Assistant Secretary for Environmental Management of DOE as the authorized representative to perform as the "Authorized Representative," as that term is used in the Nuclear Regulatory Commission (NRC) regulations at 10 CFR 72.16(b) and as name holder of the NRC license under 10 CFR Part 72 of for the Idaho Spent Fuel Facility Independent Spent Fuel Storage Installation.

  15. Geospatial Analysis and Technical Assistance for Power Plant Siting Interagency

    SciTech Connect (OSTI)

    Neher, L A

    2002-03-07

    The focus of this contract (in the summer and fall of 2001) was originally to help the California Energy Commission (CEC) locate and evaluate potential sites for electric power generation facilities and to assist the CEC in addressing areas of congestion on transmission lines and natural gas supply line corridors. Subsequent events have reduced the immediate urgency, although not the ultimate need for such analyses. Software technology for deploying interactive geographic information systems (GIS) accessible over the Internet have developed to the point that it is now practical to develop and publish GIS web sites that have substantial viewing, movement, query, and even map-making capabilities. As part of a separate project not funded by the CEC, the GIS Center at LLNL, on an experimental basis, has developed a web site to explore the technical difficulties as well as the interest in such a web site by agencies and others concerned with energy research. This exploratory effort offers the potential or developing an interactive GIS web site for use by the CEC for energy research, policy analysis, site evaluation, and permit and regulatory matters. To help ground the geospatial capabilities in the realistic requirements and needs of the CEC staff, the CEC requested that the GIS Center conduct interviews of several CEC staff persons to establish their current and envisioned use of spatial data and requirements for geospatial analyses. This survey will help define a web-accessible central GIS database for the CEC, which will augment the well-received work of the CEC Cartography Unit. Individuals within each siting discipline have been contacted and their responses to three question areas have been summarized. The web-based geospatial data and analytical tools developed within this project will be available to CEC staff for initial area studies, queries, and informal, small-format maps. It is not designed for fine cartography or for large-format posters such as the Cartographic Unit is excellent at producing for public meetings. Nor is it designed for the specialized geospatial analyses that the Cartographic Unit maintains a deservedly excellent reputation for producing. The web-based system could be used by the Cartographic Unit staff in support of CEC technical and policy staff to respond during meetings to questions posed by senior management or the public.

  16. IS&T Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IS&T Projects IS&T Projects Information Science and Technology is one of four pillars at LANL. The following is a list of IS&T projects at LANL. Contact Institute Director Stephan Eidenbenz (505) 667-3742 Email Professional Staff Assistant Nickole Aguilar Garcia (505) 665-3048 Email If you would like to add a project, send email to isti@lanl.gov. We also maintain a related page for IS&T software developed at LANL. Codesign Performance Prediction for Computational Physics POC:

  17. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    SciTech Connect (OSTI)

    Burritt, James G.; Berkey, Edgar

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  18. Microsoft Word - Cover Letter Regulatory Burden RFI 4-15-11

    Energy Savers [EERE]

    13, 2011 U.S. Department of Energy Mr. Daniel Cohen Assistant General Counsel for Legislation, Regulation and Energy Efficiency Office of the General Counsel 1000 Independence Avenue, SW Washington, DC 20585 RE: Regulatory Burden RFI Dear Mr. Cohen, On behalf of the National Association of Home Builders (NAHB), I respectfully submit the attached comments in response to the U.S. Department of Energy (DOE) request for public comment on "Improving DOE Regulations," published in the

  19. EIS-0431: Hydrogen Energy California's Project, Kern County, California

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of a proposal to provide financial assistance for the construction and operation of Hydrogen Energy California's LLC project, which would produce and sell electricity, carbon dioxide and fertilizer. DOE selected this project for an award of financial assistance through a competitive process under the Clean Coal Power Initiative program.

  20. South Dakota Geothermal Commercialization Project. Final report, July 1979-October 1985

    SciTech Connect (OSTI)

    Wegman, S.

    1985-01-01

    This report describes the activities of the South Dakota Energy Office in providing technical assistance, planning, and commercialization projects for geothermal energy. Projects included geothermal prospect identification, area development plans, and active demonstration/commercialization projects. (ACR)

  1. Information Technology Project Execution Model Guide for Small and Medium Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-12-21

    The guide supports consistent and effective implementation of DOE O 415.1 and assists IT Project Managers in effectively managing and applying sound project management to IT projects of small and medium size. Does not cancel/supersede other directives.

  2. Regulatory Burden RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cheniere Energy, Inc. ("Cheniere") submits the following comments in response to the Department of Energy's ("DOE" or "Department") request for information and comments concerning "Reducing Regulatory Burden" published in the Federal Register on February 3, 2011. PDF icon Regulatory Burden RFI More Documents & Publications Regulatory Burden RFI [76 FR 75798] SEMI-ANNUAL REPORTS FOR CHENIERE MARKETING, LLC - DK. NO. 12-99-LNG - ORDER 3164 Comments on

  3. EIA - Natural Gas Pipeline Network - Regulatory Authorities

    U.S. Energy Information Administration (EIA) Indexed Site

    Regulatory Authorities About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates U.S. Natural Gas Regulatory Authorities Beginning | Regulations Today | Coordinating Agencies | Regulation of Mergers and Acquisitions Beginning of Industry Restructuring In April 1992, the Federal Energy Regulatory Commission (FERC) issued its Order 636 and transformed the interstate natural gas transportation segment of the industry forever. Under it,

  4. Final project report

    SciTech Connect (OSTI)

    Nitin S. Baliga and Leroy Hood

    2008-11-12

    The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

  5. Community Shared Solar: Policy and Regulatory Considerations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 COMMUNITY SHARED SOLAR POLICY AND REGULATORY CONSIDERATIONS ABSTRACT Shared solar, also called community solar, is an increasingly popular business model for deploying ...

  6. Understanding the Energy Policy and Regulatory Environment

    Office of Environmental Management (EM)

    Understanding the Energy Policy and Regulatory Environment Douglas MacCourt Senior Policy ... fuel-fired electric steam and Natural gas-fired combined cycle generating units) ...

  7. Regulatory Policy Guide/Game Concept Paper

    SciTech Connect (OSTI)

    Driving Ratepayer-Funded Efficiency through Regulatory Policies Working Group

    2011-09-01

    Proposes a new resource for utility regulators to plot a course through regulatory options available to surmount barriers to aggressive and sustained utility investment in energy efficiency programs.

  8. CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Proposed Approach for Energy Efficiency Standards January 12, 2015 Natural Resources Ressources naturelles Canada ...

  9. REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT: Natural...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COUNCIL - WORK PLANNING FORMAT: Natural Gas Use in Transportation PDF icon RCC Workplan NGV.PDF More Documents & Publications REGULATORY COOPERATION COUNCIL - WORK PLANNING ...

  10. Reducing Regulatory Burden - EO 13563 Retrospective Review |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan for Retrospective Analysis of Existing Rules Regulatory and Financial Reform of Federal Research Policy: Recommendations to the NRC Committee on Research Universities

  11. Impact assisted segmented cutterhead

    DOE Patents [OSTI]

    Morrell, Roger J.; Larson, David A.; Ruzzi, Peter L.

    1992-01-01

    An impact assisted segmented cutterhead device is provided for cutting various surfaces from coal to granite. The device comprises a plurality of cutting bit segments deployed in side by side relationship to form a continuous cutting face and a plurality of impactors individually associated with respective cutting bit segments. An impactor rod of each impactor connects that impactor to the corresponding cutting bit segment. A plurality of shock mounts dampening the vibration from the associated impactor. Mounting brackets are used in mounting the cutterhead to a base machine.

  12. Village Power Technical Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    On-Request Technical Assistance » Village Power Technical Assistance Village Power Technical Assistance Village power technical assistance is designed to address the unique needs of remote Alaska Native villages. Below is a list of the various options for this type of technical assistance. To apply for village power technical assistance, complete the online technical assistance request form. Village Power Technical Assistance Options Power Cost Equalization (PCE) support Training on PCE

  13. The Mesaba Energy Project: Clean Coal Power Initiative, Round 2

    SciTech Connect (OSTI)

    Stone, Richard; Gray, Gordon; Evans, Robert

    2014-07-31

    The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project located in Northeastern Minnesota. It was selected to receive financial assistance pursuant to code of federal regulations (?CFR?) 10 CFR 600 through a competitive solicitation under Round 2 of the Department of Energy?s Clean Coal Power Initiative, which had two stated goals: (1) to demonstrate advanced coal-based technologies that can be commercialized at electric utility scale, and (2) to accelerate the likelihood of deploying demonstrated technologies for widespread commercial use in the electric power sector. The Project was selected in 2004 to receive a total of $36 million. The DOE portion that was equally cost shared in Budget Period 1 amounted to about $22.5 million. Budget Period 1 activities focused on the Project Definition Phase and included: project development, preliminary engineering, environmental permitting, regulatory approvals and financing to reach financial close and start of construction. The Project is based on ConocoPhillips? E-Gas? Technology and is designed to be fuel flexible with the ability to process sub-bituminous coal, a blend of sub-bituminous coal and petroleum coke and Illinois # 6 bituminous coal. Major objectives include the establishment of a reference plant design for Integrated Gasification Combined Cycle (?IGCC?) technology featuring advanced full slurry quench, multiple train gasification, integration of the air separation unit, and the demonstration of 90% operational availability and improved thermal efficiency relative to previous demonstration projects. In addition, the Project would demonstrate substantial environmental benefits, as compared with conventional technology, through dramatically lower emissions of sulfur dioxide, nitrogen oxides, volatile organic compounds, carbon monoxide, particulate matter and mercury. Major milestones achieved in support of fulfilling the above goals include obtaining Site, High Voltage Transmission Line Route, and Natural Gas Pipeline Route Permits for a Large Electric Power Generating Plant to be located in Taconite, Minnesota. In addition, major pre-construction permit applications have been filed requesting authorization for the Project to i) appropriate water sufficient to accommodate its worst case needs, ii) operate a major stationary source in compliance with regulations established to protect public health and welfare, and iii) physically alter the geographical setting to accommodate its construction. As of the current date, the Water Appropriation Permits have been obtained.

  14. Commercialization and Project Management PIA, Golden Field Office |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Commercialization and Project Management PIA, Golden Field Office Commercialization and Project Management PIA, Golden Field Office Commercialization and Project Management PIA, Golden Field Office PDF icon Commercialization and Project Management PIA, Golden Field Office More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software

  15. Recent regulatory experience of low-Btu coal gasification. Volume III. Supporting case studies

    SciTech Connect (OSTI)

    Ackerman, E.; Hart, D.; Lethi, M.; Park, W.; Rifkin, S.

    1980-02-01

    The MITRE Corporation conducted a five-month study for the Office of Resource Applications in the Department of Energy on the regulatory requirements of low-Btu coal gasification. During this study, MITRE interviewed representatives of five current low-Btu coal gasification projects and regulatory agencies in five states. From these interviews, MITRE has sought the experience of current low-Btu coal gasification users in order to recommend actions to improve the regulatory process. This report is the third of three volumes. It contains the results of interviews conducted for each of the case studies. Volume 1 of the report contains the analysis of the case studies and recommendations to potential industrial users of low-Btu coal gasification. Volume 2 contains recommendations to regulatory agencies.

  16. Tri-fold - Agencies Assisting with EEOICPA and the Former worker Program |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Tri-fold - Agencies Assisting with EEOICPA and the Former worker Program Tri-fold - Agencies Assisting with EEOICPA and the Former worker Program March 2015 Agencies Assisting with EEOICPA and the Former Worker Program The Joint Outreach Task Group (JOTG) includes representatives from DOE, Department of Labor (DOL), the National Institute for Occupational Safety and Health (NIOSH), the Offices of the Ombudsman for DOL and NIOSH, and the DOE-funded FWP projects. The JOTG

  17. Financial Assistance Letter No. FAL 2015-03 - Rev 2 - 08/03 | Department of

    Energy Savers [EERE]

    No FAL 2014-01 Financial Assistance Letter No FAL 2014-01 DATE: May 7, 2014 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Division D, Titles III and V, and Division E, Title VII of the Consolidated Appropriations Act, 2014, Pub. L. No. 113-76. SUMMARY: Acquisition Letter (AL) 2014-04 and Financial Assistance Letter (FAL) 2014-01 have been

  18. Financial Assistance Letter No. FAL 2013-04 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3-04 Financial Assistance Letter No. FAL 2013-04 DATE: May 15, 2013 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Division F, Title I, Title II, and Title III and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6 SUMMARY: Acquisition Letter (AL) 2013-06 and Financial Assistance Letter (FAL) 2013-04

  19. Financial Assistance Letter No. FAL 2014-01 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4-01 Financial Assistance Letter No. FAL 2014-01 DATE: May 7, 2014 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Division D, Titles III and V, and Division E, Title VII of the Consolidated Appropriations Act, 2014, Pub. L. No. 113-76. SUMMARY: Acquisition Letter (AL) 2014-04 and Financial Assistance Letter (FAL) 2014-01 have been revised to

  20. Financial Assistance Letter No. FAL 2015-03 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Financial Assistance Letter No. FAL 2015-03 DATE: June 11, 2015 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Division D, Titles III and V, and Division E, Title VII of the Consolidated and Further Continuing Appropriations Act, 2015, Pub.L. No 113-235. SUMMARY: Acquisition Letter (AL) 2015-04 and Financial Assistance Letter (FAL) 2015-03

  1. Financial Assistance Letter No. FAL 2015-04 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Financial Assistance Letter No. FAL 2015-04 DATE: September 9, 2015 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Revision to AL 2015-06/FAL 2015-04 - STRIPES Mandatory Use Policy SUMMARY: Attached is a revision to Acquisition Letter 2015-06/Financial Assistance Letter 2015-04 to add references to Notices of Funding Opportunities also known as FOAs. This

  2. TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division

    Office of Environmental Management (EM)

    POLICY FLASH 2013-38 DATE: March 18, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Revised Merit Review Guide for Financial Assistance SUMMARY: Attached is the revised Merit Review Guide for Financial Assistance. Revisions include reformatting and updating of the information presented in the Guide and Attachments. This Flash will be available online at the following website:

  3. TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division

    Office of Environmental Management (EM)

    POLICY FLASH 2013-58 DATE: June 5, 2013 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Revised Guide for Financial Assistance SUMMARY: Attached is a revised Guide for Financial Assistance. The Guide has been updated to reflect changes to web sites, organization names, systems, and DOE policies and practices since the guide was last issued. The revision date has been inserted in the

  4. Tiger Teams Provide Coalitions Technical and Market Assistance. Clean Cities Alternative Fuel Information Series, Tiger Teams Technical Assistance Fact Sheet.

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Clean Cities Technical Assistance Teams (Tiger Teams) were formed in 2001 to work directly with Clean Cities coordinators, stakeholders, and partners to tackle difficult technical and market challenges that might otherwise stall alternative fuel vehicle (AFV) implementation projects. The Tiger Team project, managed by the National Renewable Energy Laboratory (NREL), was established by the U.S. Department of Energy (DOE) to provide technical expertise to the 80 Clean Cities coalitions operating

  5. Technical Assistance Program: Off to a Running Start (Newsletter)

    SciTech Connect (OSTI)

    Not Available

    2012-02-01

    This newsletter describes key activities of the DOE Office of Indian Energy Policy and Programs for Winter 2012. Between December 2, 2011, and January 15, 2012, 46 American Indian and Alaska Native Tribes submitted applications to receive technical assistance through the program, which provides Tribes with on-the-ground technical support from DOE and National Renewable Energy Laboratory (NREL) staff to help move tribal energy efficiency and renewable energy projects forward. The applications are being considered through the Strategic Technical Assistance Response Team (START) selection process, which incorporates expert reviews and outreach to Tribes who present a need for assistance with their community-based energy efficiency and renewable energy projects. The final successful applicants will be selected based on the clarity of their requests for technical assistance and the ability of START to successfully work with each unique project or community. At least three selected Tribes in Alaska will receive technical assistance between March and May 2012, and up to five selected Tribes in the contiguous United States will receive technical assistance between March and August 2012. During the months of START Program activity, DOE and NREL experts will work in the two locations. In Alaska, START experts will work directly with community-based project teams to analyze local energy issues and provide assistance with energy projects and cost savings initiatives. This effort will be bolstered by DOE-IE's partnership with the Denali Commission, which will provide further assistance and expertise. In the lower 48 states, NREL experts will work with the selected renewable energy START projects to evaluate financial and technical feasibility and provide early development technical assistance to better position the projects for financing and construction. This on-the-ground technical assistance is part of a broader DOE-IE effort to make reliable, accurate technical information and skills-based training available to tribal communities throughout the United States. The primary goal of the START initiative, according to DOE-IE Director Tracey A. LeBeau, is to bring about the next generation of energy development in Indian Country. Through energy project planning, quality training, and technical assistance, The START program will leverage the early-stage resource characterization and pre-feasibility investments that DOE has made in Indian Country over the years, and unlock the energy resources that exist on tribal lands to help build a 21st century tribal energy economy. Working collaboratively with a select group of Tribes and Alaska Native entities, the DOE Office of Indian Energy, NREL, and the Denali Commission will empower tribal leaders to make informed energy decisions and help build capacity to bring tribal energy visions to fruition and get renewable energy projects off the ground, said LeBeau. Ultimately, these efforts will serve to further the Obama Administration and DOE's shared commitment to provide Native American and Alaska Native communities with the tools and resources they need to foster tribal energy self-sufficiency and sustainability, advancing job creation and enhancing economic competitiveness.

  6. completed_env_projects | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Solutions Completed Projects All Completed Enviromental Solutions Projects Are Listed Below by Category Produced Water | Federal Lands Access | Regulatory Streamlining | Oil Refining Completed Produced Water Management Projects Project Number Project Name Primary Performer DE-NT0005227 Membrane Technology for Produced Water at Lea County, NM Lea County Government, Lovington, NM DE-FE0000833 An Integrated Water Treatment Technology Solution for Sustainable Water Resource Management

  7. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LaboratoryNational Security Education Center Menu NSEC Educational Programs Los Alamos Dynamics Summer School Science of Signatures Advanced Studies Institute Judicial Science School SHM Data Sets and Software Research Projects Current Projects Past Projects Publications NSEC » Engineering Institute » Research Projects » Joint Los Alamos National Laboratory/UCSD research projects Past Research Projects Previous collaborations between Los Alamos National Laboratory and the University of

  8. New Mexico Small Business Assistance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    May 31, 2012 Program of Los Alamos, Sandia national laboratories LOS ALAMOS, NEW MEXICO, May 31, 2012-The New Mexico Small Business Assistance (NMSBA) program, a...

  9. Technical Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Technical Assistance program is managed through the Center for Sustainable Soil and ... Solutions that reduce technical risk and uncertainty Focus on science and engineering ...

  10. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Research Projects Joint Los Alamos National LaboratoryUCSD Research Projects Collaborations between Los Alamos National Laboratory and the University of California at San...

  11. Project Gnome

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Gnome Double Beta Decay Dark Matter Biology Repository Science Renewable Energy The first underground physics experiment near Carlsbad was Project Gnome, December 10, 1961...

  12. Project Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Management Project Management MaRIE is the experimental facility needed to control the time-dependent properties of materials for national security science missions. It ...

  13. Project Accounts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Accounts Project Accounts A redirector page has been set up without anywhere to redirect to. Last edited: 2016-04-29 11:34:50

  14. Dr. Monica Regalbuto Lays Out Vision for Tenure as EM’s New Assistant Secretary

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Confirmed as EM’s Assistant Secretary in August, Dr. Monica Regalbuto provides the leadership necessary to continue EM’s safe cleanup of the environmental legacy of the Cold War and Manhattan Project.

  15. Microreactor-Assisted Nanomaterial Deposition for Photovoltaic Thin-Film Production

    SciTech Connect (OSTI)

    2009-03-01

    This factsheet describes a research project whose goal is to develop and demonstrate a scalable microreactor-assisted nanomaterial deposition pilot platform for the production, purification, functionalization, and solution deposition of nanomaterials for PV applications.

  16. Connecticut Weatherization Project Improves Lives, Receives National

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recognition | Department of Energy Connecticut Weatherization Project Improves Lives, Receives National Recognition Connecticut Weatherization Project Improves Lives, Receives National Recognition May 6, 2014 - 12:24pm Addthis Donna Hawkins Technology Transfer Specialist, Weatherization Assistance Program Harris Walker Communications Specialist, Weatherization and Intergovernmental Program MORE WEATHERIZATION STORIES Improving Energy Efficiency and Creating Jobs through Weatherization

  17. Climate Resilience Technical Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Assistance » On-Request Technical Assistance » Climate Resilience Technical Assistance Climate Resilience Technical Assistance Climate change preparedness and resiliency technical assistance includes expert guidance to help Indian tribes and Alaska Native villages understand how to mitigate and plan for the impacts of climate change. Below is a list of the various options for this type of technical assistance. To apply for climate resilience technical assistance, complete the online

  18. Stress-Assisted Corrosion in Boiler Tubes

    SciTech Connect (OSTI)

    Preet M Singh; Steven J Pawel

    2006-05-27

    A number of industrial boilers, including in the pulp and paper industry, needed to replace their lower furnace tubes or decommission many recovery boilers due to stress-assisted corrosion (SAC) on the waterside of boiler tubes. More than half of the power and recovery boilers that have been inspected reveal SAC damage, which portends significant energy and economic impacts. The goal of this project was to clarify the mechanism of stress-assisted corrosion (SAC) of boiler tubes for the purpose of determining key parameters in its mitigation and control. To accomplish this in-situ strain measurements on boiler tubes were made. Boiler water environment was simulated in the laboratory and effects of water chemistry on SAC initiation and growth were evaluated in terms of industrial operations. Results from this project have shown that the dissolved oxygen is single most important factor in SAC initiation on carbon steel samples. Control of dissolved oxygen can be used to mitigate SAC in industrial boilers. Results have also shown that sharp corrosion fatigue and bulbous SAC cracks have similar mechanism but the morphology is different due to availability of oxygen during boiler shutdown conditions. Results are described in the final technical report.

  19. Project Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  20. Regulatory analysis technical evaluation handbook. Final report

    SciTech Connect (OSTI)

    1997-01-01

    The purpose of this Handbook is to provide guidance to the regulatory analyst to promote preparation of quality regulatory analysis documents and to implement the policies of the Regulatory Analysis Guidelines of the US Nuclear Regulatory Commission (NUREG/BR-0058 Rev. 2). This Handbook expands upon policy concepts included in the NRC Guidelines and translates the six steps in preparing regulatory analyses into implementable methodologies for the analyst. It provides standardized methods of preparation and presentation of regulatory analyses, with the inclusion of input that will satisfy all backfit requirements and requirements of NRC`s Committee to Review Generic Requirements. Information on the objectives of the safety goal evaluation process and potential data sources for preparing a safety goal evaluation is also included. Consistent application of the methods provided here will result in more directly comparable analyses, thus aiding decision-makers in evaluating and comparing various regulatory actions. The handbook is being issued in loose-leaf format to facilitate revisions. NRC intends to periodically revise the handbook as new and improved guidance, data, and methods become available.

  1. UMTRA technical assistance contractor quality assurance program plan

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements.

  2. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nonlinear Shake Table Control Collaboration between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Ellie Vigil (505) 667-2818 Email Administrative Assistant Rebecca Duran (505) 665-8899 Email UCSD Faculty and Graduate Students Professor Miroslav Krstic , Mechanical & Aerospace Engineering

  3. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Remote Inspection of Bolted Joints using Piezoelectric Sensors and RFID-Tagged Communication Collaboration between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Ellie Vigil (505) 667-2818 Email Administrative Assistant Rebecca Duran (505) 665-8899 Email UCSD Faculty and Graduate Students

  4. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Aerial Vehicle Damage Prognosis and Reliability Collaboration between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering. Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Ellie Vigil (505) 667-2818 Email Administrative Assistant Rebecca Duran (505) 665-8899 Email UCSD Faculty and Graduate Students Professor John Kosmatka, Structural Engineering

  5. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stockpile Surveillance Collaboration between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Ellie Vigil (505) 667-2818 Email Administrative Assistant Rebecca Duran (505) 665-8899 Email UCSD Faculty and Graduate Students Professor Michael Todd , Structural Engineering Professor Thomas Bewley,

  6. Technical Assistance Contractor management plan. Revision 1

    SciTech Connect (OSTI)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  7. REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy COOPERATION COUNCIL - WORK PLANNING FORMAT REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT PDF icon RCC Workplan PDF EN FR.PDF More Documents & Publications REGULATORY PARTNERSHIP STATEMENT

  8. Category:Regulatory Roadmap State Sections | Open Energy Information

    Open Energy Info (EERE)

    Regulatory Roadmap State Sections Jump to: navigation, search GRR-logo.png Looking for the Regulatory Roadmap? Click here for a user-friendly list of Regulatory Roadmap pages. This...

  9. Project Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Information Slider award map The REE Program funds projects focused on developing economically feasible and environmentally benign technologies for recovering REEs from coal and/or coal by-products. Project Information The listed projects represent the current REE program portfolio. Agreement Number Project Title Performer Name FWP-RIC REE FY2016-2020 Rare Earth Elements (REE) from Coal and Coal By-Products National Energy Technology Laboratory FE0027167 High Yield and Economical

  10. Financial Assistance Guide (2013) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Financial Assistance Guide (2013) Financial Assistance Guide (2013) PDF icon Financial Assistance Guide (2013).pdf More Documents & Publications Revised Guide for Financial Assistance U.S. Department of Energy - Guide to Financial Assistance - Audit Requirements for For-Profit Organizations U.S. Department of Energy Audit Guidance: For-Profit

  11. U.S. DOE Technical Assistance Project | Open Energy Information

    Open Energy Info (EERE)

    System benefits charges or other ratepayer-funded utility energy efficiency and renewable energy programs Renewable energy and energy efficiency portfolio standards and...

  12. Technical Assistance Project (TAP) Revolving Loan Funds: Basics...

    Broader source: Energy.gov (indexed) [DOE]

    pwebinar20090826sifuentes.pdf More Documents & Publications Revolving Loan Funds: Basics and Best Practices LoanSTAR Revolving Loan Program Revolving Loan Funds: An Introduction...

  13. The Building Codes Assistance Project (BCAP) | Open Energy Information

    Open Energy Info (EERE)

    in 1994 as a joint initiative of the Alliance to Save Energy, the American Council for an Energy-Efficient Economy, and the Natural Resources Defense Council. BCAP provides...

  14. Assisting Mexico in Developing Energy Supply and Demand Projections...

    Open Energy Info (EERE)

    AgencyCompany Organization Argonne National Laboratory Sector Energy Topics GHG inventory, Background analysis Resource Type Softwaremodeling tools Website http:...

  15. Deputy Assistant Secretary for Acquisition and Project Management

    Office of Environmental Management (EM)

    Departmental Awards Departmental Awards Documents Available for Download November 13, 2014 Facility Representative of the Year Award The Facility Representative Award Program is a special award designed to recognize superior or exemplary service by a Facility Representative over a period of one year. This special award program has been established in accordance with the requirements of Department of Energy (DOE) Order 331.1C, Employee Performance Management and Recognition Program. November 13,

  16. U.S. DOE Technical Assistance Project | Open Energy Information

    Open Energy Info (EERE)

    standards and renewable fuel standards Use of clean energy technologies to reduce air pollution and greenhouse gas emissions Use of renewable energy and energy efficiency...

  17. NEMA Comments on Reducing Regulatory Burden | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reducing Regulatory Burden NEMA Comments on Reducing Regulatory Burden The National Electrical Manufacturers Association (NEMA) thanks you for the opportunity to provide comments on the Department of Energy's efforts to make its regulatory program more effective and less burdensome in achieving its regulatory objectives. PDF icon NEMA_Comments_on_Reducing_Reg_Burden.pdf More Documents & Publications NEMA Comments on DOE Reducing Regulatory Burden RFI NEMA Comments on DOE Reducing Regulatory

  18. DOE Ex Parte Memorandum - Center for Regulatory Effectiveness | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Memorandum - Center for Regulatory Effectiveness DOE Ex Parte Memorandum - Center for Regulatory Effectiveness The Center for Regulatory Effectiveness (CRE) is submitting this memorandum pursuant to the Department of Energy's (DOE) Guidance on Ex Parte Communications. PDF icon Center_for_Reg_Effectiveness.pdf More Documents & Publications DOE Review of Regulations - Center for Regulatory Effectiveness Comments Regulatory Burden RFI: Revitalization of DOE's Role as a Regulatory

  19. Notice of Intent to Develop DOE G 415.1-1, Information Technology Project Execution Model Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-03-06

    The proposed guide will support consistent and effective implementation of DOE O 415.1 and will assist IT Program and Project Managers in effectively managing and applying sound project management to IT projects subject to that order.

  20. Category:Regulatory Roadmap Flowcharts | Open Energy Information

    Open Energy Info (EERE)

    flowcharts Subcategories This category has the following 2 subcategories, out of 2 total. G Geothermal Regulatory Roadmap Flowcharts S Solar Regulatory Roadmap...

  1. Department of Energy Request for Information: Reducing Regulatory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Request for Information: Reducing Regulatory Burden (Reply Comments) Department of Energy Request for Information: Reducing Regulatory Burden (Reply Comments) Comments on RFI on ...

  2. .Hearth, Patio & Barbecue Association's Comments on DOE's Regulatory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Association's Comments on DOE's Regulatory Burden RFI .Hearth, Patio & Barbecue Association's Comments on DOE's Regulatory Burden RFI Comments from Hearth, Patio & Barbecue ...

  3. 7/24/2014 DOE Natural Gas Regulatory...

    Broader source: Energy.gov (indexed) [DOE]

    42014 DOE Natural Gas Regulatory E-filing Application https:app.fossil.energy.govappfergasApplicationAction.go 12 Basic Information Natural Gas Regulatory E-filing...

  4. Energy Praises the Nuclear Regulatory Commission Approval of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the ...

  5. Department of Energy Commends the Nuclear Regulatory Commission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month Department of Energy Commends the Nuclear Regulatory Commission's Approval of a ...

  6. US Nuclear Regulatory Commission Input to DOE Request for Information...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart ...

  7. Comments from The National Association of Regulatory Utility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from The National Association of Regulatory Utility Commissioners (NARUC) on the Smart Grid RFI Comments from The National Association of Regulatory Utility Commissioners (NARUC) ...

  8. Effective Regulatory Institutions: The Regulator's Role in the...

    Open Energy Info (EERE)

    Regulatory Institutions: The Regulator's Role in the Policy Process, Including Issues of Regulatory Independence Jump to: navigation, search Tool Summary LAUNCH TOOL Name:...

  9. Category:Geothermal Regulatory Roadmap Sections | Open Energy...

    Open Energy Info (EERE)

    Geothermal Regulatory Roadmap Sections Jump to: navigation, search GRR-logo.png Looking for the Geothermal Regulatory Roadmap? Click here for a user-friendly list of Geothermal...

  10. Category:Regulatory Roadmap Federal Sections | Open Energy Information

    Open Energy Info (EERE)

    Datasets Community Login | Sign Up Search Category Edit History Category:Regulatory Roadmap Federal Sections Jump to: navigation, search GRR-logo.png Looking for the Regulatory...

  11. Sandia Energy - Policy and Regulatory, Codes and Standards

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policy and Regulatory, Codes and Standards Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics Solar Market Transformation Policy and Regulatory, Codes...

  12. Washington Air Quality Notice of Construction Permit Regulatory...

    Open Energy Info (EERE)

    Air Quality Notice of Construction Permit Regulatory Handbook Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook:...

  13. CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar:...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan Development - 201617; April 12, 2016 CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan ...

  14. Canada-United States Regulatory Cooperation Council Webinar:...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Canada-United States Regulatory Cooperation Council Webinar: Proposed Approach for Energy Efficiency Standards Canada-United States Regulatory Cooperation Council Webinar: Proposed ...

  15. Maryland-National Capital Building Industry Association Regulatory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maryland-National Capital Building Industry Association Regulatory Burden RFI (Federal Register August 8, 2012) Maryland-National Capital Building Industry Association Regulatory ...

  16. General Renewable Energy-Policy and Regulatory Studies | Open...

    Open Energy Info (EERE)

    and Regulatory Studies Jump to: navigation, search Tool Summary LAUNCH TOOL Name: General Renewable Energy-Policy and Regulatory Studies AgencyCompany Organization: World Bank...

  17. Carbon Capture, Transport and Storage Regulatory Test Exercise...

    Open Energy Info (EERE)

    Capture, Transport and Storage Regulatory Test Exercise: Output Report Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Carbon Capture, Transport and Storage Regulatory...

  18. Re: Request for Information on Regulatory Burden of DOE Regulations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Re: Request for Information on Regulatory Burden of DOE Regulations More Documents & Publications Edison Electric Institute (EEI) Reducing Regulatory Burden RFI, 77 Fed. ...

  19. Texas Clean Energy Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Texas Clean Energy Project Texas Clean Energy Project On March 12, 2010, DOE announced the award of a Cooperative Agreement to Summit Texas Clean Energy, LLC to construct the Texas Clean Energy Project (TCEP), an integrated gasification combined cycle (IGCC) poly-generation facility with fully integrated CO2 capture. Under Round 3 of the Clean Coal Power Initiative (CCPI), DOE is providing up to $450 million in financial assistance, including funding from the Recovery Act of 2009. Due to the

  20. Fourth RFI Comment on Regulatory Review

    Broader source: Energy.gov [DOE]

    As part of its implementation of Executive Order 13563, ‘‘Improving Regulation and Regulatory Review,’’ issued by the President on January 18, 2011, the Department of Energy (Department or DOE) is...

  1. Maine Governor Baldacci and Assistant Secretary Zoi to Announce Major

    Office of Environmental Management (EM)

    Energy Regulatory Commission Office of Energy Projects Washington, DC 20426 Magnolia LNG and Lake Charles Expansion Projects Final Environmental Impact Statement Magnolia LNG, LLC and Kinder Morgan Louisiana Pipeline LLC FERC Docket Nos. CP14-347-000 and CP14-511-000 DOE Docket Nos. 12-183-LNG, 13-131-LNG, and 13-132-LNG FERC/EIS-0260F, DOE/EIS-0498 Cooperating Agencies: U.S. Coast Guard U.S. Department of Energy U.S. Department of Transportation U.S. Army Corps of Engineers U.S. Environmental

  2. Regulatory Burden RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Association of Home Appliance Manufacturers (AHAM) respectfully submits the following comments to the Department of Energy (DOE) on its Request for Information on reducing regulatory burden, 76 Fed. Reg. 6123 (Feb. 3, 2011). PDF icon Regulatory Burden RFI More Documents & Publications WPN 00-5: Approval of Replacement Refrigerators and Electric Water Heaters as Allowable Weatherization Measures TEE-0012 - In the Matter of Electrolux Home Products, Inc. TEE-0022 - In the Matter of Maytag

  3. Small-Scale Hydroelectric Power Demonstration Project

    SciTech Connect (OSTI)

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  4. Active Financial Assistance Letters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Active Financial Assistance Letters Active Financial Assistance Letters Below is a list of all active Financial Assistance Letters with the most recent FALs on top. May 11, 2016 Financial Assistance Letter No. FAL 2016-03 Pre-Award Risk Assessments and the utilization of the Federal Awardee Performance and Integrity Information System (FAPIIS). February 17, 2016 Financial Assistance Letter No. FAL 2016-02 Congressional Notifications and Quarterly March 7, 2016 Financial Assistance Letter No. FAL

  5. Project Management Coordination Office Organization Chart | Department of

    Energy Savers [EERE]

    Project Financing Catalog of Services Project Financing Catalog of Services Document details the Federal Energy Management Program's catalog of technical assistance services it offers for federal agencies that want to use project funding mechanisms to finance energy efficiency and renewable energy projects. PDF icon project_funding_catalog_of_services.pdf More Documents & Publications Energy Savings Performance Contract ENABLE Briefing Federal Utility Partnership Working Group 2011 Meeting:

  6. Line Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington Transmission System Upgrade Project - M2W Olympia-Grand Coulee No. 1...

  7. ENVIRONMENTAL ASSESSMENT FOR Braddock Locks and Dam Hydro Electric Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ENVIRONMENTAL ASSESSMENT FOR Braddock Locks and Dam Hydro Electric Project (DOE/EA-2017) U.S. Department of Energy Office of Energy Efficiency and Renewable Energy October 2015 Environmental Assessment for Braddock Lock and Dam Hydro Electric Project (DOE/EA-2017) SUMMARY The Federal Energy Regulatory Commission (FERC) issued a notice of availability on June 13, 2014 for the Final Environmental Assessment for FERC Project No. 13739-002 - Braddock Locks and Dam Hydroelectric project. The FERC

  8. Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report

    SciTech Connect (OSTI)

    2000-08-01

    OAK B188 Risk-informed assessment of regulatory and design requirements for future nuclear power plants. Annual report. The overall goal of this research project is to support innovation in new nuclear power plant designs. This project is examining the implications, for future reactors and future safety regulation, of utilizing a new risk-informed regulatory system as a replacement for the current system. This innovation will be made possible through development of a scientific, highly risk-formed approach for the design and regulation of nuclear power plants. This approach will include the development and/or confirmation of corresponding regulatory requirements and industry standards. The major impediment to long term competitiveness of new nuclear plants in the U.S. is the capital cost component--which may need to be reduced on the order of 35% to 40% for Advanced Light Water Reactors (ALWRS) such as System 80+ and Advanced Boiling Water Reactor (ABWR). The required cost reduction for an ALWR such as AP600 or AP1000 would be expected to be less. Such reductions in capital cost will require a fundamental reevaluation of the industry standards and regulatory bases under which nuclear plants are designed and licensed. Fortunately, there is now an increasing awareness that many of the existing regulatory requirements and industry standards are not significantly contributing to safety and reliability and, therefore, are unnecessarily adding to nuclear plant costs. Not only does this degrade the economic competitiveness of nuclear energy, it results in unnecessary costs to the American electricity consumer. While addressing these concerns, this research project will be coordinated with current efforts of industry and NRC to develop risk-informed, performance-based regulations that affect the operation of the existing nuclear plants; however, this project will go further by focusing on the design of new plants.

  9. Environmental/Radiological Assistance Directory (ERAD) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Environmental Radiological Assistance Directory or ERAD, developed by AU-22, serves as an assistance tool to the DOE complex for protection of the public and environment from ...

  10. Energy Department Announces Technical Assistance Opportunity...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Assistance Opportunity for Tribal Clean Energy Deployment Energy Department Announces Technical Assistance Opportunity for Tribal Clean Energy Deployment December 2, 2011 ...

  11. Electrically-Assisted Diesel Particulate Filter Regeneration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Substrate Studies of an Electrically-Assisted Diesel Particulate Filter Electrically-Assisted Diesel Particulate Filter Regeneration Durability of ...

  12. Electrically-Assisted Diesel Particulate Filter Regeneration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Electrically-Assisted Diesel Particulate Filter Regeneration Substrate Studies of an Electrically-Assisted Diesel Particulate Filter Biofuels Impact ...

  13. Help Desk Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Help Desk Assistance Welcome to HelpDesk Assistance Online at Online Learning Center (OLC) Whether you're looking to discover new learning opportunities, better manage your ...

  14. Department of Energy Idaho - Contracts, Financial Assistance...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contracts, Financial Assistance & Solicitations Contracts, Financial Assistance & Solicitations Procurement and Acquisition, Doing Business With the U.S. Department of Energy ...

  15. Profiles in Leadership: Christopher Smith, Assistant Secretary...

    Energy Savers [EERE]

    Christopher Smith, Assistant Secretary for Fossil Energy Profiles in Leadership: Christopher Smith, Assistant Secretary for Fossil Energy July 15, 2015 - 8:19am Addthis Profiles in ...

  16. Project Benefits

    Broader source: Energy.gov [DOE]

    Benefits of the Guidelines for Home Energy Professionals project including reducing energy upgrade costs for consumers, employers, and program administrators.

  17. Hydropower Projects

    Broader source: Energy.gov [DOE]

    This report covers the Wind and Water Power Technologies Office's hydropower project funding from fiscal years 2008 to 2014.

  18. Networking and Solar Technical Assistance

    Broader source: Energy.gov [DOE]

    The SunShot Initiative provides state and local decision-makers with timely and actionable resources, peer networks, and technical assistance to lower local market barriers and establish best...

  19. Community Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Community Assistance Community Assistance For more than 50 years, DOE and its predecessor agencies produced materials to manufacture nuclear weapons and conduct activities for the Manhattan Engineer District. To accommodate these activities, more than 20,000 facilities throughout the country were built, a large contractor work force was established, and communities were transformed. President George H.W. Bush's announcement of the first unilateral nuclear weapons reduction agreement on September

  20. New Mexico Small Business Assistance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Small Business Assistance Program to recognize outstanding companies at Innovation Celebration April 6, 2010 LOS ALAMOS, New Mexico, April 6, 2010-The New Mexico Small Business Assistance Program (NMSBA) helped 320 companies in 25 counties last year to solve technical challenges. Nine companies that participated in the program in 2009 will be honored for their outstanding achievements April 8 at the NMSBA's Innovation Celebration. Journalists are invited to meet small business owners,

  1. Casework Assistance | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Casework Assistance When asked to analyze potential evidence that is outside the procedures and capabilities of their laboratory, criminalists currently turn to neighboring crime laboratories, specialized federal resources, or outside experts with whom they have worked in the past. The MFRC is working to improve crime laboratory access to established local, regional, and national casework resources and to assist regional crime laboratories to establish new casework resources by: Providing a

  2. Alternative multimedia regulatory programs for next-generation refineries

    SciTech Connect (OSTI)

    Elcock, D.; Gasper, J.; Arguerro, R.; Emerson, D.

    2000-06-22

    The 25-year-old command-and-control environmental regulatory structure in the US has resulted in significant environmental improvements. Recently, however, its limitations (e.g., rigid application regardless of site-specific conditions, disregard of cross-media and multimedia impacts, limited incentives for new technology development and use) have become increasingly apparent. New regulatory approaches that recognize current and anticipated economic constraints, new knowledge of environmental processes and impacts, and the benefits of new technologies are needed. Such approaches could be especially important for the US petroleum refining industry. This industry operates under thin profit margins, releases chemicals that can produce adverse health and environmental impacts, and must meet the technological challenges of producing more highly refined fuels from poorer quality feedstocks. Under a grant from the Environmental Technology Initiative (ETI), Argonne National Laboratory and its subcontractor, Analytical Services, Inc. developed two alternative environmental regulatory programs for next-generation petroleum refineries. (In this report, next-generation refineries refers to the refineries of today as they operate in the next 20 or more years rather than to fully reengineered future refineries.) The objective of the ETI refinery project was to develop future-oriented regulatory programs for next-generation refineries that will expand the use of innovative technologies, encourage pollution prevention, demonstrate environmental responsibility, and maintain refinery economic performance. Rather than suggesting targeted, short-term modifications to existing media-specific command-and-control regulations, the ETI project suggests the use of new approaches that are broader and more flexible. It recognizes that giving refineries flexibility in meeting environmental protection goals can stimulate new technology development and use. Unlike most US Environmental Protection Agency (EPA) reinvention efforts, which seek results in 12 to 18 months, this ETI effort assumes a time frame of 20 years or more. It also assumes that existing laws and regulations can be changed. An iterative and interactive process was used by the project team to develop the alternative approaches. Information and stakeholder input were integrated to provide for constant revision and improvement. First, guidelines and principles were established to bound the study and set parameters for developing the approaches. Next, existing and projected environmental laws and regulations affecting petroleum refineries were examined to identify areas needing change. Then, to understand future challenges and opportunities, the projected refinery operating environment was described in terms of feedstock, product, technology, and economics. Finally several goals and indicators for assessing and comparing the alternatives were identified. On the basis of this background information, more than 60 options that could efficiently and effectively protect human health and the environment were identified. These options ranged from fundamental changes in program philosophy to procedural improvements. After the options were evaluated against the goals and indicators, many of them were integrated into two separate thematic paradigms: a risk-based paradigm and a goal-based paradigm. Elements common to both approaches include the following: (1) Establish the baseline--In establishing the baseline, the refinery and the regulator jointly identify residuals for which release limits must be established; (2) Set residual release limits--The refinery and the regulator jointly specify release limits on a facility-wide rather than a source-specific basis. A facility-wide permit documents the release limits; and (3) Assure compliance--Incentives provide the basis for assuring compliance, and flexibility in the compliance method is encouraged. Penalties apply if releases exceed the limits, and reporting requirements are streamlined relative to current practices.

  3. New - DOE G 415.1-2, INFORMATION TECHNOLOGY PROJECT EXECUTION MODEL GUIDE FOR SMALL AND MEDIUM PROJECTS

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The guide supports consistent and effective implementation of DOE O 415.1 and assists IT Project Managers in effectively managing and applying sound project management to IT projects of small and medium size. Does not cancel/supersede other directives.

  4. Regulatory Burden Request for Information | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Request for Information Regulatory Burden Request for Information Response to Regulatory Burden RFI PDF icon Regulatory Burden Request for Information More Documents & Publications DOE Preliminary Plan for Retrospective Analysis of Existing Rules DOE_05_18_2011.pdf Regulatory Burden RFI - Docket No. DOE-HQ-2011-0014-0001

  5. US Nuclear Regulatory Commission functional organization charts, March 15, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  6. U. S. Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1989-07-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions and branches are presented.

  7. Clinch River Breeder Reactor: an assessment of need for power and regulatory issues

    SciTech Connect (OSTI)

    Hamblin, D M; Tepel, R C; Bjornstad, D J; Hill, L J; Cantor, R A; Carroll, P J; Cohn, S M; Hadder, G R; Holcomb, B D; Johnson, K E

    1983-09-01

    The purpose of this report is to present the results of a research effort designed to assist the US Department of Energy in: (1) reviewing the need for power from the Clinch River Breeder Reactor (CRBR) in the Southeastern Electric Reliability Council (SERC) region, not including Florida, and (2) isolating specific regulatory and institutional issues and physical transmission capacities that may constrain the market for CRBR power. A review of existing electric power wheeling arrangements in the Southeast and specific federal and state regulatory obstacles that may affect power sales from the CRBR was undertaken. This review was a contributing factor to a decision to target the service territory to SERC-less Florida.

  8. International Assistance for Low-Emission Development Planning: Coordinated Low Emissions Assistance Network (CLEAN) Inventory of Activities and Tools--Preliminary Trends

    SciTech Connect (OSTI)

    Cox, S.; Benioff, R.

    2011-05-01

    The Coordinated Low Emissions Assistance Network (CLEAN) is a voluntary network of international practitioners supporting low-emission planning in developing countries. The network seeks to improve quality of support through sharing project information, tools, best practices and lessons, and by fostering harmonized assistance. CLEAN has developed an inventory to track and analyze international technical support and tools for low-carbon planning activities in developing countries. This paper presents a preliminary analysis of the inventory to help identify trends in assistance activities and tools available to support developing countries with low-emission planning.

  9. Project 1010013

    Office of Scientific and Technical Information (OSTI)

    1010013 Integrated Analysis of Protein Complexes and Regulatory Networks Involved in Anaerobic Energy Metabolism of Shewanella Oneidensis MR-1 Tiedje, James M. Michigan State University RESULTS TO DATE: I. Progress Summary During the 2005 funding year, our research efforts focused on three primary aspects of S.oneidensis biology important for potential bioremediation applications: 1) nitrate reduction, 2) the stress response, and 3) understanding the diversity within the Shewanella since natural

  10. Integrated Approach to Reconstruction of Microbial Regulatory Networks

    SciTech Connect (OSTI)

    Rodionov, Dmitry A; Novichkov, Pavel S

    2013-11-04

    This project had the goal(s) of development of integrated bioinformatics platform for genome-scale inference and visualization of transcriptional regulatory networks (TRNs) in bacterial genomes. The work was done in Sanford-Burnham Medical Research Institute (SBMRI, P.I. D.A. Rodionov) and Lawrence Berkeley National Laboratory (LBNL, co-P.I. P.S. Novichkov). The developed computational resources include: (1) RegPredict web-platform for TRN inference and regulon reconstruction in microbial genomes, and (2) RegPrecise database for collection, visualization and comparative analysis of transcriptional regulons reconstructed by comparative genomics. These analytical resources were selected as key components in the DOE Systems Biology KnowledgeBase (SBKB). The high-quality data accumulated in RegPrecise will provide essential datasets of reference regulons in diverse microbes to enable automatic reconstruction of draft TRNs in newly sequenced genomes. We outline our progress toward the three aims of this grant proposal, which were: Develop integrated platform for genome-scale regulon reconstruction; Infer regulatory annotations in several groups of bacteria and building of reference collections of microbial regulons; and Develop KnowledgeBase on microbial transcriptional regulation.

  11. Comments on reducing regulatory burden | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    reducing regulatory burden Comments on reducing regulatory burden Comments on reducing regulatory burden from Ingersoll Rand, Residential Solutions, manufacturer of Trane and American Standard residential air conditioners, heat pumps, furnaces, and accessories PDF icon Comments on reducing regulatory burden More Documents & Publications Regulatory Burden RFI [76 FR 75798] Notice of Availability of Preliminary Plan for Retrospective Analysis of Existing Rules 2014-09-18 Issuance: Energy

  12. Reducing Regulatory Burden; Retrospective Review Under E.O. 13563 |

    Energy Savers [EERE]

    Department of Energy Burden; Retrospective Review Under E.O. 13563 Reducing Regulatory Burden; Retrospective Review Under E.O. 13563 Request for information on reducing regulatory burden, E.O. 13563 PDF icon Reducing Regulatory Burden; Retrospective Review Under E.O. 13563 More Documents & Publications Notice of Availability of Preliminary Plan for Retrospective Analysis of Existing Rules Reducing Regulatory Burden Reducing Regulatory Burden

  13. Department of Energy Request for Information: Reducing Regulatory Burden

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Reply Comments) | Department of Energy Request for Information: Reducing Regulatory Burden (Reply Comments) Department of Energy Request for Information: Reducing Regulatory Burden (Reply Comments) Comments on RFI on reducing regulatory burden PDF icon Department of Energy Request for Information: Reducing Regulatory Burden (Reply Comments) More Documents & Publications Re: Regulatory Burden RFI RegReview_ReplyComments_Lennox_Hearth_Products.PDF .Hearth, Patio & Barbecue

  14. Alaska Native Community Energy Planning and Projects (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-06-01

    This fact sheet provides information on the Alaska Native villages selected to receive assistance from the U.S. Department of Energy Office of Indian Energy 2013 Strategic Technical Assistance Response Team (START) Program, which provides technical expertise to support the development of next-generation energy projects on tribal lands.

  15. Nuclear Regulatory Commission Information Digest, 1991 edition

    SciTech Connect (OSTI)

    Olive, K L

    1991-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs.

  16. Geothermal direct-heat utilization assistance

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    Progress on technical assistance, R D activities, technology transfer, and geothermal progress monitoring is summarized.

  17. Community food projects win $149,000 in grants

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community food projects win 149,000 in grants Los Alamos grant writing program played key ... Editor Ute Haker Email With the help of the Grant Writing Assistance Program that is ...

  18. Department of Energy Idaho - Idaho Cleanup Project Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contracts, Financial Assistance & Solicitations > ICP-Core Contract Idaho Cleanup Project (ICP) Core Basic Contract Contract Modifications Other Documents Last Updated: 03/22/2016 Privacy Statement and Disclaimer Contact Aaron S Nebeker

  19. Weatherization Assistance Program (WAP) Closeout Frequently Asked Questions

    Energy Savers [EERE]

    WEATHERIZATION ASSISTANCE PROGRAM CLOSEOUT FREQUENTLY ASKED QUESTIONS INVENTORY CONTROL 1. Q: How should local agencies deal with bulk purchasing of weatherization materials? A: Local agencies should plan any purchase of materials based on projected needs for completing Recovery Act production. Grantees should monitor local agencies to make sure they have adequate inventory systems to manage and account for materials purchased for the WAP. 2. Q: When Recovery Act ends there will most certainly

  20. Letter from James Ajello, Chair, to Assistant Secretary James Rispoli

    Office of Environmental Management (EM)

    20585 June 18, 2008 James A. Rispoli Assistant Secretary for Environmental Management 1000 Independence Avenue S.W. Washington, DC 20585 Dear Mr. Rispoli: The Environmental Management Advisory Board (EMAB) was asked to provide information, advice, and recommendations concerning issues affecting the Environmental Management (EM) program, in accordance with the Federal Advisory Committee Act. Specifically, you requested the Board to focus on the topics of Small Business, Acquisition, and Project

  1. USDA- Repowering Assistance Biorefinery Program

    Broader source: Energy.gov [DOE]

    The reimbursement amounts vary and are determined by the availability of funds, the project scope, and the ability of the proposed project to meet all the scoring criteria. In particular reimburs...

  2. Walking the Talk: Employer Assisted Programs (301) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Walking the Talk: Employer Assisted Programs (301) Walking the Talk: Employer Assisted Programs (301) May 1

  3. Project Construction

    Office of Energy Efficiency and Renewable Energy (EERE)

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  4. Discontinued Projects

    Broader source: Energy.gov [DOE]

    Discontinued projects received a loan or a loan guarantee from DOE, but that are considered discontinued by LPO for one of several reasons.

  5. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    structure whose behavior is fundamentally nonlinear. Thus, the students assigned to this project will develop control techniques that will allow an electrodynamic shake table to...

  6. Project Complete

    Broader source: Energy.gov [DOE]

    DOE has published its Record of Decision announcing and explaining DOE’s chosen project alternative and describing any commitments for mitigating potential environmental impacts. The NEPA process...

  7. Custom Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Management Small Industrial Lighting Compressed Air ESUE Motors Federal Agriculture Custom Projects No two industrial customers are alike; each has its own unique...

  8. Project Tour

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Tour Transportation Transportation to the tour will be provided from Hilton Santa Fe Buffalo Thunder to Los Alamos National Laboratory, Technical Area 55. After the...

  9. project management

    National Nuclear Security Administration (NNSA)

    %2A en Project Management and Systems Support http:nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  10. project management

    National Nuclear Security Administration (NNSA)

    3%2A en Project Management and Systems Support http:www.nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  11. Research Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Past Research Projects Composite-to-Steel Joint Integrity Monitoring and Assessment ... engineering programs and the pit manufacturing program. STUDENT RESOURCES Precollege ...

  12. Technical Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic energy planning Grantee support Transmissioninterconnection Project development Finance Lease agreements DOE's National Renewable Energy Laboratory and Sandia National ...

  13. Relocation Assistance | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Relocation Assistance Relocation Assistance The CNS Relocation Assistance Program can help make your relocation to the area as smooth as possible. When you have accepted employment at the Y-12 National Security Complex, we want to help make your relocation to the area as smooth as possible. The Consolidated Nuclear Security, LLC, Relocation Assistance Program can lessen the financial burden of relocating. Assistance is available to eligible transfers and new hires who meet the criteria

  14. Performance Assessment Assistance Activities in the DOE Complex - 12325

    SciTech Connect (OSTI)

    Seitz, Roger R.; Phifer, Mark A.; Letourneau, Martin J.

    2012-07-01

    The United States Department of Energy Office of Environmental Management (DOE-EM) has established a Performance Assessment Community of Practice (PA CoP) to foster the sharing of information among performance assessment (PA) and risk assessment practitioners, regulators and oversight personnel. The general intent is to contribute to continuous improvement in the consistency, technical adequacy and quality of implementation of PAs and risk assessments around the DOE Complex. The PA CoP activities have involved commercial disposal facilities and international participants to provide a global perspective. The PA CoP has also sponsored annual technical exchanges as a means to foster improved communication and to share lessons learned from on-going modelling activities. The PA CoP encourages activities to provide programmatic and technical assistance in the form of sharing experience and lessons learned with practitioners during the development of PAs and risk assessments. This assistance complements DOE-EM reviews through the Low-Level Waste Disposal Facility Federal Review Group (LFRG) that are conducted after modelling efforts are completed. Such up-front assistance is providing additional value in terms of improving consistency and sharing of information. There has been a substantial increase in the amount of assistance being provided. The assistance has been well received by practitioners and regulators that have been involved. The paper highlights assistance and sharing of information that has been conducted in the last two years to support activities underway in support of proposed disposal facilities at Paducah, Portsmouth, and the Idaho National Laboratory and tank closure at Hanford. DOE-EM established the PA CoP to help improve the consistency and quality of implementation of modelling activities around the DOE Complex. The PA CoP has sponsored annual technical exchanges as a means to foster improved communication and to share lessons learned from ongoing modelling activities. Practitioners; project managers; oversight personnel; and regulators from United States and international facilities have participated in the three technical exchanges that have been held to date. At the working level, the PA CoP has sponsored technical assistance in support of modelling activities that are currently underway. The assistance concept provides a means to share specific experience, good practices, and lessons learned on topics of interest at a given site while the modelling is being conducted. Such up-front assistance complements the sharing of information that occurs via regular LFRG meetings and independent LFRG reviews that are conducted when the modelling effort is completed. Examples from assistance activities that have been conducted at Idaho, Paducah, Portsmouth and Hanford were highlighted in this paper. There were differences in the types of assistance provided at each site. In some cases the assistance was focused on technical support for the practitioners and management responsible for the development of the PAs. At other sites, the assistance included working with the developers and regulators/stakeholders involved in the process to help with reaching consensus on critical assumptions. Such interactions have proven to be very effective to help all parties get a chance to discuss their perspectives and better understand the different points of view. In all cases, the assistance was used as a means to share broader perspectives, experiences and lessons learned with personnel engaged in a modelling activities at a given site. The combination of technical exchanges and targeted technical assistance has provided additional means to encourage the sharing of information around the DOE Complex and globally. Feedback from practitioners, oversight personnel, regulators and stakeholders that have been involved has been overwhelmingly positive. It is believed that such sharing of information and experiences is contributing to continuous improvement in the consistency, technical adequacy, and quality of modelling activities. Alt

  15. Awarded projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    projects Awarded projects 2016 Allocation Awards This page lists the allocation awards for NERSC for the 2016 allocation year (Jan 12, 2016 through Jan 09, 2017). Read More » Previous Year Awards Last edited: 2016-04-29 11:35:1

  16. EIS-0464: Lake Charles Carbon Capture and Storage (CCS) Project in Calcasieu Parish, Louisiana

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of providing financial assistance for the construction and operation of a project proposed by Leucadia Energy, LLC. DOE selected this project for an award of financial assistance through a competitive process under the Industrial Carbon Capture and Sequestration Program.

  17. The regulatory battleground: A briefing for commanders

    SciTech Connect (OSTI)

    Wirick, D.

    1995-12-31

    This imperfect analogy likens the history and current status of public utility regulation to a military campaign. Clearly, the relationship between regulators and utilities has not always been combative, but intermittent conflict has necessarily characterized the relationship. Nonetheless, this military analogy describes some of the elements of the history of regulation and may have implications for regulatory policy in the near term. The scene is a battlefield headquarters not far from the heat of the conflict. The commanders of regulatory units are gathered. In the distance, the low rumble of troop movements can be heard. Ladies and gentlemen, please take your seats. As you are aware, recent developments have placed regulatory forces in extreme jeopardy. Our forces are under stress, and though they continue to fight, the confusion of the current situation is beginning to take its toll. In most cases, reinforcements have been denied and our lines of logistical support have been weakened. Without effective and rapid action on our part, the regulatory battle will be lost and we will be driven from the field. Until consumers are well-enough armed to protect themselves, a process that is certainly suspect and potentially time-consuming, they will be powerless and undoubtedly victimized.

  18. Obtain regulatory support services and technical expertise

    Office of Energy Efficiency and Renewable Energy (EERE)

    The purpose of this task order (TO) is to obtain regulatory support services and technical expertise required to comply with the March 2005 Compliance Order on Consent (Consent Order), the Individual Permit for Stormwater (IP), Resource Conservation and Recovery Act (RCRA) Hazardous Waste Facility Permit (RCRA Permit, and other applicable compliance areas for Fiscal Year 2016.

  19. FEDERAL LOAN GUARANTEE SOLICITATION & SUPPLEMENTS FOR: ADVANCED FOSSIL ENERGY PROJECTS

    Energy Savers [EERE]

    FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) Form provides information on the federal assistance budget for construction projects, including calculation of the federal award needed to meet requirements, exclusions, and the proposed method for calculating the non-federal share. PDF icon FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) More Documents & Publications DOE F 4600.4 DOE F 4600.5 DOE F 4600.3

    ADVANCED FOSSIL ENERGY

  20. The Advanced Research Projects, OAS-RA-11-11

    Energy Savers [EERE]

    Audit Report The Advanced Research Projects Agency - Energy OAS-RA-11-11 August 2011 Department of Energy Washington, DC 20585 August 22, 2011 MEMORANDUM FOR THE DIRECTOR, ADVANCED RESEARCH PROJECTS AGENCY - ENERGY FROM: George W. Collard Assistant Inspector General for Audits Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Advanced Research Projects Agency - Energy" BACKGROUND The Advanced Research Projects Agency - Energy (ARPA-E), an agency within the

  1. Computer System, Cluster, and Networking Summer Institute Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CSCNSI Projects Computer System, Cluster, and Networking Summer Institute Projects Present and past projects Contacts Program Lead Carolyn Connor (505) 665-9891 Email Professional Staff Assistant Nickole Aguilar Garcia (505) 665-3048 Email 2015 Projects The summer school program was held June 1-July 31, 2015, at the National Security Education Center (NSEC) and New Mexico Consortium (NMC). Class of 2015 2015-si-group Back Row L-R: Matthew Broomfield (instructor), Gustavo Rayos, Destiny

  2. Project Management Update - Paul Bosco, Director, Office of Acquisition &

    Office of Environmental Management (EM)

    Project Financing Catalog of Services Project Financing Catalog of Services Document details the Federal Energy Management Program's catalog of technical assistance services it offers for federal agencies that want to use project funding mechanisms to finance energy efficiency and renewable energy projects. PDF icon Download the catalog of services. More Documents & Publications Energy Savings Performance Contract ENABLE Briefing Federal Utility Partnership Working Group 2011 Meeting:

  3. Concerns in Marine Renewable Energy Projects

    SciTech Connect (OSTI)

    Kramer, Sharon; Previsic, Mirko; Nelson, Peter; Woo, Sheri

    2010-06-17

    To accelerate the adoption of these emerging marine hydrokinetic technologies, navigational and environmental issues and concerns must be identified and addressed. As hydrokinetic projects move forward, various stakeholders will need to be engaged; one of the key issues that project proponents face as they engage stakeholders is that many conflicting uses and environmental issues are not well-understood. Much of this lack of understanding comes from a limited understanding of the technologies themselves. To address this issue, in September 2008, RE Vision consulting, LLC, was selected by the Department of Energy, under their market acceleration program, to apply a scenario-based assessment approach to the emerging hydrokinetic technology sector. The goal was to improve understanding of potential environmental and navigation impacts of these technologies and focus stakeholders on the critical issues. To meet this goal, the study established baseline scenarios for wave and tidal power conversion at potential future deployment sites. The scenarios captured variations in technical approaches and deployment scales and thus grounded the analysis in realistic constraints. The work conducted under this award provides an important foundation to other market acceleration activities carried out by the DOE and other stakeholders in this sector. The scenarios were then evaluated using a framework developed by H.T. Harvey & Associates to identify and characterize key environmental concerns and uncertainties. In collaboration with PCCI and the U.S. Coast Guard, navigation issues were assessed and guidelines developed to assure the safe operation of these systems. Finally, the work highlights “next steps” to take to continue development and adoption of marine hydrokinetic energy. Throughout the project, close collaboration with device developers, project developers and regulatory stakeholders was pursued to ensure that assumptions and constraints are realistic. Results concur with most of the permitting hurdles experienced by on-going projects in the U.S., and specific recommendations are provided for identifying and addressing them. While many areas of further research were identified, the study did not identify any major show-stoppers, largely because these technologies have a relatively low environmental risk-profile if compared to other activities routinely permitted in the marine environment. The frameworks and representative scenarios developed provide an objective and transparent tool for stakeholders, regulators and developers to assist in the decision-making process for siting wave and tidal energy plants, and meet our goal of improving understanding between all stakeholders. The final product consists of three reports: Report 1 - Wave Energy Scenarios. This report includes: A technology characterization of four different wave energy technologies, including major technical specifications, device performance, and technical siting considerations; A site characterization of two potential deployment sites located in Hawaii and California; Outlines of device installation, O&M and decommissioning activities; Navigational demarcation requirements; and, Deployment Scenarios, identifying all the major life-cycle-related impacts. Report 2 - Tidal Energy Scenarios. This report includes: A technology characterization of three tidal energy technologies, including major technical specifications, device performance, and technical siting considerations; A site characterization of one potential deployment location in the Puget Sound, Washington; Outlines of device installation, O&M and decommissioning activities; Navigational demarcation requirements; and, Deployment Scenarios, identifying all the major life-cycle-related impacts.Report 3 - Framework for Identifying Key Environmental Concerns. This report describes frameworks for identifying key environmental effects and applies them to the wave and tidal energy deployment scenarios described in the first two reports. It highlights critical issues and recommendations for future research.

  4. Financial Assistance Letter No. FAL 2015-02 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    15-02 Financial Assistance Letter No. FAL 2015-02 DATE: February 25, 2015 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Acquisition Letter 2015-03/Financial Acquisition Letter 2015-02 Congressional Notifications and Quarterly Reporting to the Appropriations Committees Subject to Energy and Water Development and Related Agencies Appropriations Act, 2015,

  5. Microsoft Word - NR WIPP TECH ASSISTANCE RFQ MAY 3 2010.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Seeks Technical Assistance Contractor at New Mexico Waste Isolation Pilot Plant Cincinnati -- The Department of Energy (DOE) issued a Request for Quotation (RFQ) today for a technical assistance contract to the Carlsbad Field Office and the Waste Isolation Pilot Project (WIPP) in Carlsbad, NM. This acquisition is under a General Services Administration (GSA) Federal Supply Schedule. The Department intends to award a single task order with a three-year performance period with options that can

  6. NREL: Technology Deployment - Project Success Stories

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Project Success Stories NREL's technology deployment best practices, project support, and technical assistance, and technology acceleration activities are resulting in successful renewable energy and energy efficiency implementation in numerous locations. Photo of a man with a blue hard hat on installing instrumentation on an 80 meter meteorological tower used to measure the wind resource in Bangladesh. Success Stories from Developing Countries Demonstrate Impacts of Low Emission Development

  7. Los Alamos Dynamics Summer School Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Los Alamos Dynamics Summer School » Los Alamos Dynamics Summer School-Overview Los Alamos Dynamics Summer School Projects Los Alamos Dynamics Summer School Projects and Resources Contact Institute Director Charles Farrar (505) 665-0860 Email Executive Administrator Ellie Vigil (505) 667-2818 Email Administrative Assistant Rebecca Duran (505) 665-8899 Email Past Programs and Resources 2015 2014 STUDENT RESOURCES Precollege Undergrads Graduates Postdocs Housing Los Alamos National Laboratory Logo

  8. EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA

    Broader source: Energy.gov [DOE]

    This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snohomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The Federal Energy Regulatory Commission (FERC) is the lead agency. The DOE NEPA process for this project has been canceled.

  9. Office of the Assistant General Counsel for Procurement and Financial Assistance

    Broader source: Energy.gov [DOE]

    The Office of the Assistant General Counsel for Procurement and Financial Assistance provides legal support and advice regarding the Department's massive contractual expenditures and financial...

  10. 2015 Summary Report on Industrial and Regulatory Engagement Activities

    SciTech Connect (OSTI)

    Thomas, Kenneth David

    2015-09-01

    The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies pathway of the Light Water Reactor Sustainability(LWRS) Program conducts a vigorous engagement strategy with the U.S. nuclear power industry, including the nuclear operating companies, major support organizations, the Nuclear Regulatory Commission (NRC), and suppliers. The goal of this engagement strategy is to develop a shared vision and common understanding across the nuclear industry of the need for II&C modernization, the performance improvement that can be obtained, and the opportunities for collaboration to enact this vision. The primary means of engaging the nuclear operating companies is through a Utility Working Group (UWG), composed of utility representatives that participate in formal meetings and bi-monthly phone calls to provide input on nuclear plant needs and priorities for II&C technologies. Two working groups were initiated during FY 2015 to provide a means for UWG members to focus on particular technologies of interest. The Outage Improvement Working Group consists of eight utilities that participate in periodic conference calls and have access to a share-point web page for acccess to project materials developed in the Advanced Outage Control Center pilot project. In the area of computer-based procedures and automated work packages, the II&C Pathway has worked with the Nuclear Information Technology Strategic Leadership (NITSL) to set up a monthly conference call with interested utility members to discuss various aspects of mobile worker technologies. Twenty one technical and project reports were delivered to the UWG during FY 2015, reflecting the work of the II&C Pathway pilot projects during the year. Distribution of these reports is one of the primary means of transferring to the nuclear industry the knowledge and experience gained during the development of advanced II&C technologies in support of LWR sustainability. Site visits to discuss pilot project activities and future plans were made to Arizona Public Service, Exelon, Duke Energy, Pacific Gas & Electric, SCANA, Southern Nuclear, South Texas Project, STARS Alliance, Tennessee Valley Authority, and Xcel. Discussions were also held on the pathway goals and activities with major industry support organizations during FY 2102, including the Institute of Nuclear Power Operations (INPO), the Nuclear Information Technology Strategic Leadership (NITSL), the Nuclear Energy Institute (NEI), and the Electric Power Research Institute. The Advanced II&C Pathway work was presented at five major industry conferences and Informal discussions were held with key NRC managers at industry conferences. In addition, discussions were held with NRC senior managers on digital regulatory issues through participation on the NEI Digital I&C Working Group. Meetings were held with major industry suppliers and consultants, to explore opportunities for collaboration and to provide a means of pilot project technology transfer. In the international area, discussions were held with Electricite’ de France (EdF) concerning possible collaboration in the area NPP configuration control using intelligent wireless devices.

  11. Financial Assistance Letter No. FAL 2015-04 - Revised 9/9/2015 | Department

    Energy Savers [EERE]

    of Energy 4 - Revised 9/9/2015 Financial Assistance Letter No. FAL 2015-04 - Revised 9/9/2015 DATE: September 9, 2015 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Revision to AL 2015-06/FAL 2015-04 - STRIPES Mandatory Use Policy SUMMARY: Attached is a revision to Acquisition Letter 2015-06/Financial Assistance Letter 2015-04 to add references to Notices of

  12. EGS Projects

    Broader source: Energy.gov [DOE]

    EGS projects span research, development, and demonstration. Unlike traditional hydrothermal systems, EGS capture heat from areas that traditional geothermal energy cannot—where fluid and/or...

  13. RENOTER Project

    Broader source: Energy.gov [DOE]

    Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE materials, as well as efficient material integration and production process.

  14. Project Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... The purpose of this project is to develop improved heat transfer fluids, thermal storage ... The majority of the current R&D effort is focused on parabolic trough facilities. Sandia ...

  15. HUD's Rental Assistance Demonstration Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... and their respective owners. VANGUARD COMMUNITIES ConnectHome Communities: * Albany, GA * ... BEST PRACTICES CREATING A COMMUNITY OF PRACTICE All icons used belong to the Noun Project ...

  16. Project 1027697

    Office of Scientific and Technical Information (OSTI)

    05 ERSD Annual Report Project #1027697 Long-term Stewardship of Mixed Wastes: Passive Reactive Barriers for Simultaneous In Situ Remediation of Chlorinated Solvent, Heavy Metal and Radioactive.... Principal Investigator: Gerlach, Robin Organization: Montana State University Results To Date 1. MOST RECENT RESULTS TO DATE This project report addresses one part of a 3-way collaboration between researchers (Drs. Robin Gerlach and Al Cunningham) at Montana State University's (MSU's) Center for

  17. Category:Regulatory Roadmap Overview Sections | Open Energy Informatio...

    Open Energy Info (EERE)

    Category Edit History Category:Regulatory Roadmap Overview Sections Jump to: navigation, search GRR-logo.png Looking for the Regulatory Roadmap? Click here for a user-friendly list...

  18. Regulatory Burden RFI from AHRI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon DOE Com Reg Burden RFI 1-4-12.pdf More Documents & Publications Regulatory Burden RFI Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory Burden RFI ...

  19. NAESCO Comments on Reducing Regulatory Burden RFI Final | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy NAESCO Comments on Reducing Regulatory Burden RFI Final NAESCO Comments on Reducing Regulatory Burden RFI Final The National Association of Energy Service Companies (NAESCO) appreciates the opportunity to submit these comments in response to the Request for Information (RFI) entitled, "Reducing Regulatory Burden," published in the Federal Register on May 15, 2012. PDF icon NAESCO_Cmts_Reducing_Reg_Burden_RFI_Final.pdf More Documents & Publications FPCC Regulatory

  20. DOE Comments Regulatory Burden RFI | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comments Regulatory Burden RFI DOE Comments Regulatory Burden RFI These comments are submitted by Rheem Manufacturing Company in response to the U.S. Department of Energy's (DOE) notice appearing in the December 5, 2011 Federal Register requesting information on existing regulations that should be modified, streamlined, expanded, or repealed. PDF icon Reg_Review_DOE_comts_RFI.pdf More Documents & Publications Fourth RFI Comment on Regulatory Review Reducing Regulatory Burden EO 13563 Third