National Library of Energy BETA

Sample records for regional transmission planning

  1. The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations

    SciTech Connect (OSTI)

    Kirby, Brendan J

    2006-07-01

    Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second, market and reliability rules have, understandably, been written around the capabilities and limitations of generators, the historic reliability resources. Responsive load limitations and capabilities are often not accommodated in markets or reliability criteria. Third, because of the institutional structure, demand response alternatives are treated as temporary solutions that can delay but not replace transmission enhancement. Financing has to be based on a three to five year project life as opposed to the twenty to fifty year life of transmission facilities. More can be done to integrate demand response options into transmission expansion planning. Given the societal benefits it may be appropriate for independent transmission planning organizations to take a more proactive role in drawing demand response alternatives into the resource mix. Existing demand response programs provide a technical basis to build from. Regulatory and market obstacles will have to be overcome if demand response alternatives are to be routinely considered in transmission expansion planning.

  2. Interconnection-Wide Transmission Planning Initiative - Meeting...

    Energy Savers [EERE]

    Recovery Act Interconnection Transmission Planning Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning...

  3. Regional Transmission Projects: Finding Solutions

    SciTech Connect (OSTI)

    The Keystone Center

    2005-06-15

    The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

  4. Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission

    E-Print Network [OSTI]

    Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission Summary of Key..................................................................................................................................... 1 Northwest Transmission Planning), there was concern that there had been little progress on addressing the developing transmission issues in the region

  5. Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations

    SciTech Connect (OSTI)

    Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

    2011-02-01

    The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

  6. Interconnection-Wide Transmission Planning Initiative: Topic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency...

  7. Interconnection-Wide Transmission Planning Initiative: Topic...

    Office of Environmental Management (EM)

    A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the...

  8. 10 Year Transmission Plan for the Western Electricity Interconnection Released

    Broader source: Energy.gov [DOE]

    The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities.

  9. Marketing Plan for Transmission Planning Services

    E-Print Network [OSTI]

    Tu, Linh

    2006-12-15

    in the non-consulting side of the firm, the following are services provided on the consulting side, still known as Consultation Company: ? Cogeneration services ? Energy facilities planning ? Energy supply management ? Transmission ? Utility formation... Consultation Company?s competitive advantage in the electrical industry is their experience and expertise in the energy market. The company has been working with companies and individuals to help plan, develop and build power plants for over twenty years...

  10. Interconnection-Wide Transmission Planning Initiative: Topic...

    Office of Environmental Management (EM)

    Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern...

  11. Value-based reliability transmission planning

    SciTech Connect (OSTI)

    Dalton, J.G. III; Garrison, D.L.; Fallon, C.M.

    1996-08-01

    This paper presents a new value-based reliability planning (VBRP) process proposed for planning Duke Power Company`s (DPC) regional transmission system. All transmission served customers are fed from DPC`s regional transmission system which consists of a 44-kV predominantly radial system and a 100-kV predominantly non-radial system. In the past, any single contingency that could occur during system peak conditions and cause a thermal overload required the overloaded facility to be upgraded, regardless of the costs or the likelihood of the overload occurring. The new VBRP process is based on transmission system reliability evaluation and includes the following important elements: (1) a ten-year historical data base describing the probabilities of forced outages for lines and transformers; (2) a five-year average load duration curve describing the probability of an overload should a contingency occur; (3) a customer outage cost data base; (4) and probabilistic techniques. The new process attempts to balance the costs of improving service reliability with the benefits or value that these improvements bring to these customers. The objective is to provide the customers their required level of reliability while minimizing the Total Cost of their electric service.

  12. WECC releases its first-ever transmission plan for the Western Interconnection

    Broader source: Energy.gov [DOE]

    The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection.

  13. Interconnection-Wide Transmission Planning Initiative: Topic...

    Broader source: Energy.gov (indexed) [DOE]

    Western Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards...

  14. Moving Beyond Paralysis: How States and Regions Are Creating Innovative Transmission Projects

    SciTech Connect (OSTI)

    Schumacher, A.; Fink, S.; Porter, K.

    2009-10-01

    This report profiles certain state and regional transmission policy initiatives aimed at promoting transmission development, mainly to access renewable resources – including renewable energy zones, location-constrained tariffs, open seasons, and balanced portfolio plans. In particular, this article focuses on transmission initiatives intended to plan and build transmission in advance of new generation, instead of waiting for enough planned new generation to justify the development of a new transmission line of sufficient capability.

  15. Transmission Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand,...

  16. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    DOE). 2006. National Electric Transmission Congestion Study.Division. 2003. Electric Transmission Plan for RenewableIdentifying Minnesota’s Electric Transmission Infrastructure

  17. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    Certificates of Need for Transmission Lines to Support theand Preference in Transmission Service. ” Washington, D.C. :Integrating Wind into Transmission Planning: The Rocky

  18. Plan to Conduct Electric Transmission Congestion Study: Federal...

    Office of Environmental Management (EM)

    Plan to Conduct Electric Transmission Congestion Study: Federal Register Volume 76, No. 218 - Nov. 10, 2011 Plan to Conduct Electric Transmission Congestion Study: Federal Register...

  19. Linear relaxations for transmission system planning

    E-Print Network [OSTI]

    Taylor, Joshua A.

    We apply a linear relaxation procedure for polynomial optimization problems to transmission system planning. The approach recovers and improves upon existing linear models based on the DC approximation. We then consider ...

  20. A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS

    E-Print Network [OSTI]

    Mills, Andrew; Wiser, Ryan; Porter, Kevin

    2007-01-01

    it to traditional utility planning. We then summarize theCoordination of utility transmission planning efforts helpedof planning for reliability across multiple utilities.

  1. Central Wind Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities: Revised Edition

    SciTech Connect (OSTI)

    Rogers, J.; Porter, K.

    2011-03-01

    The report and accompanying table addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America. The first part of the table focuses on electric utilities and regional transmission organizations that have central wind power forecasting in place; the second part focuses on electric utilities and regional transmission organizations that plan to adopt central wind power forecasting in 2010. This is an update of the December 2009 report, NREL/SR-550-46763.

  2. Transmission Cost Allocation Methodologies for Regional Transmission Organizations

    SciTech Connect (OSTI)

    Fink, S.; Rogers, J.; Porter, K.

    2010-07-01

    This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

  3. REGIONAL WATER SUPPLY PLANNING AND

    E-Print Network [OSTI]

    Mays, Larry W.

    CHAPTER 3 REGIONAL WATER SUPPLY PLANNING AND CAPACITY EXPANSION MODELS Messele Z. Ejeta California Department of Water Resources Sacramento, California Larry W. Mays Department of Civil and Environmental Engineering Arizona State University Tempe, Arizona 3.1 INTRODUCTION Water supply planning on a regional scale

  4. Biennial Assessment of the Fifth Power Plan Transmission Issues

    E-Print Network [OSTI]

    unscheduled electricity flows over transmission lines leading to increased risks to electric system-construction alternatives to transmission; · Inability to effectively monitor the wholesale electricity market, identifyBiennial Assessment of the Fifth Power Plan Transmission Issues INTRODUCTION The Fifth Power Plan

  5. Scheduling Planned Maintenance of Electrical Power Transmission Networks Using

    E-Print Network [OSTI]

    Fernandez, Thomas

    Scheduling Planned Maintenance of Electrical Power Transmission Networks Using Genetic Algorithms Technical Report: CSRP­97­26 10 November 1997 Abstract The maintenance of the electrical power transmission Plan­ ning, Electricity Transmission Networks. 1 To appear in In Gennady K. Voronovsky and Serguey A

  6. Regional Public Coordination Transportation Plan Texoma Region #22 

    E-Print Network [OSTI]

    Texoma Council of Governments

    2006-12-01

    .......................................................................................................... 6 Regional Geography and Demographics..................................................................................... 6 Regional Agencies Responsible for Transportation Planning.................................................. 6 Descriptions... of the Region?s Public Transportation Providers................................................. 7 Coordinated Transportation Plan..................................................................................................... 8 Coordination Actions...

  7. Thurston Regional Planning Council Helps Washingtonians Save...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Thurston Regional Planning Council Helps Washingtonians Save on Travel Costs Thurston Regional Planning Council Helps Washingtonians Save on Travel Costs April 10, 2013 - 12:00am...

  8. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    Transmission Cost Incremental Generation as Only BeneficiaryUnit of Incremental Generation Equipment Cost Assumptions2003 Least Cost Resource Plan Wind Generation. Xcel Energy

  9. Transmission investment and expansion planning in a restructured electricity market

    E-Print Network [OSTI]

    Leung, Ka-Cheong

    Transmission investment and expansion planning in a restructured electricity market F.F Wua,b , F.L. Zhengb,c , F.S. Wena,b, * a Center for Electrical Energy Systems, University of Hong Kong, Pokfulam Road, Guangzhou, 510640, China Abstract Transmission planning in a restructured electricity market becomes

  10. Southeast Texas Region Regional Public Transportation Coordination Plan 

    E-Print Network [OSTI]

    Southeast Texas Regional Planning Commission

    2006-01-01

    REGION REGIONAL PUBLIC TRANSPORTATION COORDINATION PLAN PREPARED FOR THE TEXAS DEPARTMENT OF TRANSPORTATION NOVEMBER 2006 REGIONAL PUBLIC TRANSPORTATION COORDINATION PLAN NOVEMBER 2006 PAGE 1 Table of Contents... ....................................................................4 History of Regional Coordination of Public Transportation ..............................10 REGIONAL SERVICE COORDINATION PLANNING........................................................10 Lead Agency...

  11. Electric Transmission Network: A Multi-Region Analysis, The

    Reports and Publications (EIA)

    2000-01-01

    This paper examines the ability of the existing transmission network to respond efficiently to increased trade over four reliability regions in the northeastern United States.

  12. Transmission Expansion Planning with Re-design

    E-Print Network [OSTI]

    2010-05-17

    Expanding an electrical transmission network requires heavy investments that ... would be too complex to handle, electrical transmission and energy genera- ... Our new modelling introduces more flexibility and is general, in the sense that it ...

  13. South Texas Planning Region Public Transportation Coordination Plan 

    E-Print Network [OSTI]

    South Texas Development Council Economic Development Program

    2006-12-15

    stream_source_info SOUTH TEXAS PLANNING REGION PUBLIC TRANSPORTATION COORDINATION PLAN.pdf.txt stream_content_type text/plain stream_size 58851 Content-Encoding ISO-8859-1 stream_name SOUTH TEXAS PLANNING REGION PUBLIC TRANSPORTATION... COORDINATION PLAN.pdf.txt Content-Type text/plain; charset=ISO-8859-1 KFH GROUP, INC. SOUTH TEXAS PLANNING REGION PUBLIC TRANSPORTATION COORDINATION PLAN Developed for the: SOUTH TEXAS DEVELOPMENT COUNCIL ECONOMIC...

  14. Recovery Act Interconnection Transmission Planning | Department...

    Energy Savers [EERE]

    - are identifying transmission requirements under a broad range of alternative electricity futures (including intensive application of demand-side technologies), and...

  15. NREL: Transmission Grid Integration - Transmission Planning and Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass map shines lightGeospatial ToolkitSMARTS -BeingFutureResearch StaffTransmission

  16. Improving Electricity Resource-Planning Processes by Considering the Strategic Benefits of Transmission

    E-Print Network [OSTI]

    Budhraja, Vikram

    2010-01-01

    Upgrading California’s Electric Transmission System: Issuesshould be adapted to transmission electric system planning,Mobasheri, (Electric Power Group, LLC). 2008. Transmission

  17. Generation and transmission expansion planning for renewable energy integration

    SciTech Connect (OSTI)

    Bent, Russell W; Berscheid, Alan; Toole, G. Loren

    2010-11-30

    In recent years the expansion planning problem has become increasingly complex. As expansion planning (sometimes called composite or integrated resource planning) is a non-linear and non-convex optimization problem, researchers have traditionally focused on approximate models of power flows to solve the problem. The problem has also been split into generation expansion planning (GEP) and transmission network expansion planning (TNEP) to improve computational tractability. Until recently these approximations have produced results that are straight-forward to combine and adapt to the more complex and complete problem. However, the power grid is evolving towards a state where the adaptations are no longer easy (e.g. large amounts of limited control, renewable generation, comparable generation and transmission construction costs) and necessitates new approaches. Recent work on deterministic Discrepancy Bounded Local Search (DBLS) has shown it to be quite effective in addressing the TNEP. In this paper, we propose a generalization of DBLS to handle simultaneous generation and transmission planning.

  18. AC transmission system planning choosing lines from a discrete set

    E-Print Network [OSTI]

    Gilbertson, Eric W.

    2013-04-24

    Transmission system planning (TSP) is a difficult nonlinear optimization problem involving non-convex quadratic terms, as well as discrete variables. We extend prior results for linear relaxations, drawing on a preliminary ...

  19. A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS

    E-Print Network [OSTI]

    Mills, Andrew; Wiser, Ryan; Porter, Kevin

    2007-01-01

    179c/179c9e0086c0.pdf National Wind CoordinatingTransmission Planning and Wind Energy. Issue Brief. August.and Renewable Energy, Wind & Hydropower Technologies Program

  20. Comments in response to FERC rulemaking on regional transmission organizations

    E-Print Network [OSTI]

    Joskow, Paul L.

    1999-01-01

    On May 13, 1999, the Federal Energy Regulatory Commission (FERC) issued a Notice of Proposed Rulemaking (NOPR) on Regional Transmission Organizations (RTO). The purpose of the NOPR is to solicit comments on proposed FERC ...

  1. Moving Beyond Paralysis: How States and Regions Are Creating Innovative Transmission Projects; May 2009 - May 2010

    SciTech Connect (OSTI)

    Schumacher, A.; Fink, S.; Porter, K.

    2009-10-01

    This report profiles certain state and regional transmission policy initiatives aimed at promoting transmission development, mainly to access renewable resources.

  2. Transmission planning in the era of integrated resource planning: A survey of recent cases

    SciTech Connect (OSTI)

    Baldick, R.; Kahn, E.P.

    1992-09-01

    State action is critical to the expansion of the high-voltage transmission network, because regulated utilities must seek approval from utility commissions for proposals to site new lines. It is the purpose of this report to survey the regulatory treatment of issues that are unique to or ubiquitous in transmission planning and use. The authors review recent transmission siting cases to examine how the issues are presented to and resolved by state regulatory commissions and to provide a perspective for more general discussion of transmission policy. Their primary focus is on planning issues. Transmission capacity expansion is not typically treated in integrated resource planning. It is usually assumed that there is adequate transmission to achieve any particular plan. The authors believe that one important reason for this omission is the inherent complexity of transmission system expansion. Regulators and competitors may be at a serious disadvantage in negotiating or adjudicating specific transmission proposals with utilities, who generally have greater knowledge of both general technological considerations and case specifics. This problem of asymmetric information must be addressed at some level in planning or dispute resolution. However, they observe that explicit consideration of the information problem is absent from most regulatory and technical analysis of transmission. The goal of this survey is to share knowledge about the problems facing state regulators over the siting of new transmission facilities, and help to define constructive approaches to them.

  3. Texas State Planning Region 3 Report of Regional Transportation Coordination 

    E-Print Network [OSTI]

    Nortex Regional Planning Commission

    2006-12-01

    stream_source_info Nortex Regional Transportation Coordination Plan.pdf.txt stream_content_type text/plain stream_size 50110 Content-Encoding ISO-8859-1 stream_name Nortex Regional Transportation Coordination Plan.pdf.txt Content... Transportation Coordination December 1, 2006 Submitted to The Texas Department of Transportation Mission To provide reliable, quality, coordinated, public transportation. Texas State Planning Region 3 Page 1 Table of Contents Table...

  4. Transmission network expansion planning with simulation optimization

    SciTech Connect (OSTI)

    Bent, Russell W [Los Alamos National Laboratory; Berscheid, Alan [Los Alamos National Laboratory; Toole, G. Loren [Los Alamos National Laboratory

    2010-01-01

    Within the electric power literatW''e the transmi ssion expansion planning problem (TNEP) refers to the problem of how to upgrade an electric power network to meet future demands. As this problem is a complex, non-linear, and non-convex optimization problem, researchers have traditionally focused on approximate models. Often, their approaches are tightly coupled to the approximation choice. Until recently, these approximations have produced results that are straight-forward to adapt to the more complex (real) problem. However, the power grid is evolving towards a state where the adaptations are no longer easy (i.e. large amounts of limited control, renewable generation) that necessitates new optimization techniques. In this paper, we propose a generalization of the powerful Limited Discrepancy Search (LDS) that encapsulates the complexity in a black box that may be queJied for information about the quality of a proposed expansion. This allows the development of a new optimization algOlitlun that is independent of the underlying power model.

  5. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    SciTech Connect (OSTI)

    Mills, Andrew D.; Wiser, Ryan; Porter, Kevin

    2009-02-02

    The rapid development of wind power that the United States has experienced over the last several years has been coupled with a growing concern that wind development will require substantial additions to the nation's transmission infrastructure. Transmission is particularly important for wind power due to the locational dependence of wind resources, the relatively low capacity factor of wind plants, and the mismatch between the short lead time to build a new wind project and the longer lead time often needed to plan, permit, and construct transmission. It is clear that institutional issues related to transmission planning, siting, and cost allocation will pose major obstacles to accelerated wind power deployment, but also of concern is the potential cost of this infrastructure build out. Simply put, how much extra cost will society bear to deliver wind power to load centers? Without an answer to this question, there can be no consensus on whether or not the cost of developing transmission for wind will be a major barrier to further wind deployment, or whether the institutional barriers to transmission expansion are likely to be of more immediate concern. In this report, we review a sample of 40 detailed transmission studies that have included wind power. These studies cover a broad geographic area, and were completed from 2001-2008. Our primary goal in reviewing these studies is to develop a better understanding of the transmission costs needed to access growing quantities of wind generation. A secondary goal is to gain a better appreciation of the differences in transmission planning approaches in order to identify those methodologies that seem most able to estimate the incremental transmission costs associated with wind development. Finally, we hope that the resulting dataset and discussion might be used to inform the assumptions, methods, and results of higher-level assessment models that are sometimes used to estimate the cost of wind deployment (e.g. NEMS and WinDS). The authors and general location of the 40 detailed transmission studies included in our review are illustrated in Figure ES-1. As discussed in the body of the report, these studies vary considerably in scope, authorship, objectives, methodology, and tools. Though we recognize this diversity and are cognizant that comparisons among these studies are therefore somewhat inappropriate, we nonetheless emphasize such simple comparisons in this report. We do so in order to improve our understanding of the range of transmission costs needed to access greater quantities of wind, and to highlight some of the drivers of those costs. In so doing, we gloss over many important details and differences among the studies in our sample. In emphasizing simple comparisons, our analysis focuses primarily on the unit cost of transmission implied by each of the studies. The unit cost of transmission for wind in $/kW terms on a capacity-weighted basis is estimated by simply dividing the total transmission cost in a study by the total amount of incremental generation capacity (wind and non-wind) modeled in that study. In so doing, this metric assumes that within any individual study all incremental generation capacity imposes transmission costs in proportion to its nameplate capacity rating. The limitations to this approach are described in some detail in the body of the report.

  6. California's electricity system of the future scenario analysis in support of public-interest transmission system R&D planning

    E-Print Network [OSTI]

    Eto, Joseph; Stovall, John P.

    2003-01-01

    The Future of Electric Transmission in the United States.Environmental Impacts of Electric Transmission In order toTransmission R&D Planning Underwater application of electric

  7. STUDENT MANUAL SCHOOL OF CITY AND REGIONAL PLANNING

    E-Print Network [OSTI]

    Li, Mo

    STUDENT MANUAL SCHOOL OF CITY AND REGIONAL PLANNING COLLEGE OF ARCHITECTURE GEORGIA INSTITUTE OF TECHNOLOGY MASTER OF CITY AND REGIONAL PLANNING ........................................................................................... 1 III. CITY AND REGIONAL PLANNING FACULTY AND STAFF, 20132014

  8. KAir Battery Wins Southwest Regional Clean Energy Business Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    KAir Battery Wins Southwest Regional Clean Energy Business Plan Competition KAir Battery Wins Southwest Regional Clean Energy Business Plan Competition April 18, 2014 - 12:05pm...

  9. A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS

    E-Print Network [OSTI]

    Mills, Andrew; Wiser, Ryan; Porter, Kevin

    2007-01-01

    Generation Outlet Electric Transmission Study. May.Identifying Minnesota’s Electric Transmission InfrastructureGeneration Outlet Electric Transmission Study Xcel-31A

  10. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    additional transmission costs to new electricity generators,additional transmission costs to new electricity generators,Electricity Coordinating Council / California - 13 transmission

  11. Energy-water analysis of the 10-year WECC transmission planning study cases.

    SciTech Connect (OSTI)

    Tidwell, Vincent Carroll; Passell, Howard David; Castillo, Cesar; Moreland, Barbara

    2011-11-01

    In 2011 the Department of Energy's Office of Electricity embarked on a comprehensive program to assist our Nation's three primary electric interconnections with long term transmission planning. Given the growing concern over water resources in the western U.S. the Western Electricity Coordinating Council (WECC) requested assistance with integrating water resource considerations into their broader electric transmission planning. The result is a project with three overarching objectives: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners in the Western Interconnection to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between the Western Electricity Coordinating Council (WECC), Western Governors Association (WGA), the Western States Water Council (WSWC) and their associated stakeholder teams. (3) Exercise the Energy-Water DSS to investigate water stress implications of the transmission planning scenarios put forward by WECC, WGA, and WSWC. The foundation for the Energy-Water DSS is Sandia National Laboratories Energy-Power-Water Simulation (EPWSim) model (Tidwell et al. 2009). The modeling framework targets the shared needs of energy and water producers, resource managers, regulators, and decision makers at the federal, state and local levels. This framework provides an interactive environment to explore trade-offs, and 'best' alternatives among a broad list of energy/water options and objectives. The decision support framework is formulated in a modular architecture, facilitating tailored analyses over different geographical regions and scales (e.g., state, county, watershed, interconnection). An interactive interface allows direct control of the model and access to real-time results displayed as charts, graphs and maps. The framework currently supports modules for calculating water withdrawal and consumption for current and planned electric power generation; projected water demand from competing use sectors; and, surface and groundwater availability. WECC's long range planning is organized according to two target planning horizons, a 10-year and a 20-year. This study supports WECC in the 10-year planning endeavor. In this case the water implications associated with four of WECC's alternative future study cases (described below) are calculated and reported. In future phases of planning we will work with WECC to craft study cases that aim to reduce the thermoelectric footprint of the interconnection and/or limit production in the most water stressed regions of the West.

  12. Toledo Regional Economic PlanToledo Regional Economic Plan Transportation and LogisticsTransportation and Logistics

    E-Print Network [OSTI]

    Azad, Abdul-Majeed

    Toledo Regional Economic PlanToledo Regional Economic Plan Transportation and LogisticsTransportation and Logistics Industry SectorIndustry Sector Submitted by:Submitted by: Transportation and Logistics Working GroupTransportation and Logistics Working Group September 2009September 2009 #12;22 Transportation

  13. Central Wind Power Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities

    SciTech Connect (OSTI)

    Porter, K.; Rogers, J.

    2009-12-01

    The report addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America.

  14. May 29 Tribal Renewable Energy Webinar to Highlight Regional...

    Energy Savers [EERE]

    May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning...

  15. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    building transmission to meet peak wind conditions during peak transmission usage periods, and the magnitude of curtailment may be small

  16. Applying waste logistics modeling to regional planning

    SciTech Connect (OSTI)

    Holter, G.M.; Khawaja, A.; Shaver, S.R.; Peterson, K.L.

    1995-05-01

    Waste logistics modeling is a powerful analytical technique that can be used for effective planning of future solid waste storage, treatment, and disposal activities. Proper waste management is essential for preventing unacceptable environmental degradation from ongoing operations, and is also a critical part of any environmental remediation activity. Logistics modeling allows for analysis of alternate scenarios for future waste flowrates and routings, facility schedules, and processing or handling capacities. Such analyses provide an increased understanding of the critical needs for waste storage, treatment, transport, and disposal while there is still adequate lead time to plan accordingly. They also provide a basis for determining the sensitivity of these critical needs to the various system parameters. This paper discusses the application of waste logistics modeling concepts to regional planning. In addition to ongoing efforts to aid in planning for a large industrial complex, the Pacific Northwest Laboratory (PNL) is currently involved in implementing waste logistics modeling as part of the planning process for material recovery and recycling within a multi-city region in the western US.

  17. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    in Transmission Service. ” Washington, D.C. : Federal EnergyNational Transmission Grid Study. Washington, D.C. : U.S.California Transmission Options Study NTAC - 2A Submarine DC

  18. A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS

    E-Print Network [OSTI]

    Mills, Andrew; Wiser, Ryan; Porter, Kevin

    2007-01-01

    A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROMof establishing a wind transmission cost adder with respectthat involve wind and divide the cost by the relative share

  19. MRP Program in the Graduate Field of City and Regional Planning Department of City and Regional Planning, AAP

    E-Print Network [OSTI]

    Walter, M.Todd

    1 MRP Program in the Graduate Field of City and Regional Planning Department of City and Regional Planning, AAP City and regional planning is an interdisciplinary field of study focused on understanding choose to pursue doctoral degrees in planning or allied fields such as public policy, environmental

  20. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    Generation and Transmission and Western Area Power Administration Clean and Diversified Energy Advisory Committee (CDEAC) Transmission Task Force NorthWestern Energy ElectricGeneration and Transmission and Western Area Power Administration Clean and Diversified Energy Advisory Committee (CDEAC) Transmission Task Force NorthWestern Energy Electric

  1. Regional Service Planning for the Coastal Bend 

    E-Print Network [OSTI]

    Coastal Bend Council of Governments

    2006-12-01

    -Type text/plain; charset=ISO-8859-1 ?R?E?G?I?O?N?A?L? ?S?E?R?V?I?C?E? ?P?L?A?N?N?I?N?G ?F?O?R? ?T?H?E? ?C?O?A?S?T?A?L? ?B?E?N?D ?R?e?g?i?o?n?a?l? ?P?u?b?l?i?c? ?T?r?a?n?s?p?o?r?t?a?t?i?o?n ?C?o?o?r?d?i?n?a?t?i?o?n? ?S?t?u?d?y ?w...?w?w?.?r?e?g?i?o?n?a?l?s?e?r?v?i?c?e?p?l?a?n?n?i?n?g?.?o?r?g ?D?e?c?e?m?b?e?r? ?1?,? ?2?0?0?6 Regional Service Planning for the Coastal Bend Regional Public Transportation Coordination Study This study was funded by financial grant from the Texas...

  2. The transmission dynamics of syphilis and the CDC's elimination plan Romulus Breban1

    E-Print Network [OSTI]

    Blower, Sally

    1 The transmission dynamics of syphilis and the CDC's elimination plan Romulus Breban1 , Virginie that their control strategies will be effective it is important to understand the transmission dynamics of syphilis), and the analysis of a syphilis transmission model. We use spectral analysis to reanalyze the CDC's data set

  3. Saint Kitts and Nevis-Regional Implementation Plan for CARICOM...

    Open Energy Info (EERE)

    Saint Kitts and Nevis-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Jump to: navigation, search Name Saint Kitts and Nevis-Regional Implementation...

  4. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    on U.S. Wind Power Installation, Cost, and PerformanceTransmission ($/kW-wind) Unit Cost (Capacity-weighted) Windof Transmission ($/MWh- wind) Unit Cost (Capacity-weighted)

  5. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    Annual Report on U.S. Wind Power Installation, Cost, andcost of transmission implied by this study is $207/kW-wind (U.S.lead us to overstate the unit cost of transmission for wind.

  6. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    NREL/CP-500-35969. Global WindPower Conference. Chicago,Transmission Projects. ” Windpower 2007 Conference. Los

  7. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    Mexico to Arizona January 2008 SWAT Transmission to access renewable resource zones in Arizona NorthWestern Energy

  8. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    2006. Transmission and Wind Energy: Capturing the Prevailingand Renewable Energy (Wind & Hydropower Technologiesand Renewable Energy Wind & Hydropower Technologies Program

  9. STUDENT MANUAL SCHOOL OF CITY AND REGIONAL PLANNING

    E-Print Network [OSTI]

    Li, Mo

    STUDENT MANUAL SCHOOL OF CITY AND REGIONAL PLANNING COLLEGE OF ARCHITECTURE GEORGIA INSTITUTE OF TECHNOLOGY MASTER OF CITY AND REGIONAL PLANNING DEGREE Academic Year 2014-2015 #12;Contents I. INTRODUCTION..............................................................................................1 III. CITY AND REGIONAL PLANNING FACULTY AND STAFF, 2013

  10. A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS

    E-Print Network [OSTI]

    Mills, Andrew; Wiser, Ryan; Porter, Kevin

    2007-01-01

    transmission upgrades do not involve building new lines, such as DCD.C. , June. Available at: http://www.eei.org/industry_issues/energy_infrastructure/transmission/DC converters between links. Traditionally, utilities have been responsible for ensuring that the local transmission

  11. Capricious Cables: Understanding the Key Concepts in Transmission Expansion Planning and Its Models

    SciTech Connect (OSTI)

    Donohoo, P.; Milligan, M.

    2014-06-01

    The extra-high-voltage transmission network is the bulk transport network of the electric power system. To understand how the future power system may react to planning decisions today, wide-area transmission models are increasingly used to aid decision makers and stakeholders. The goal of this work is to illuminate these models for a broader audience that may include policy makers or relative newcomers to the field of transmission planning. This paper explains the basic transmission expansion planning model formulation. It highlights six of the major simplifications made in transmission expansion planning models and the resulting need to contextualize model results using knowledge from other models and knowledge not captured in the modeling process.

  12. Microsoft Word - DOE RFI on Transmission Planning - PGE Comments...

    Broader source: Energy.gov (indexed) [DOE]

    California. PG&E engages in the businesses of electricity and natural gas distribution, electricity generation, procurement and transmission, and natural gas procurement,...

  13. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    Estimates of Congestion Costs. The Electricity Journal 17,Incremental Transmission Costs Due to Wind Power. Rockville,and Intermittency Really Cost? Supply Curves for Electricity

  14. Regional Service Plan For Coordinated Transportation In the Permian Basin 

    E-Print Network [OSTI]

    Permian Basin Regional Planning Commission

    2010-10-27

    Regional Service Plan Permian Basin ? Region 9 Table of Contents I. Acknowledgements 4 II. Executive Summary 5 III. Background 6 A. Regional Description 6 i. Geography and Demographics 6 ii. Transportation... Planning Partners 12 iii. Current Transportation Services/Providers 13 B. History of Regional Coordination of Public Transportation 14 i. Past/Continuing Planning Activities 14 ii. Past/Current Implemented Projects/Services 15 IV...

  15. Transmission System Expansion Plans in View Point of Deterministic, Probabilistic and Security Reliability Criteria

    E-Print Network [OSTI]

    Transmission System Expansion Plans in View Point of Deterministic, Probabilistic and Security reliability criterion, probabilistic reliability criterion and security criterion based on N- contingency control system as well as reasonable strength of grid originally. Because investment for power system

  16. Department of Industrial Engineering Fall 2011 Transmission Component Reverse Engineering and Process Planning

    E-Print Network [OSTI]

    Demirel, Melik C.

    PENNSTATE Department of Industrial Engineering Fall 2011 Transmission Component Reverse Engineering to fabricate the parts in the Industrial Engineering Department Factory for Advanced Manufacturing Education of the transmission to reverse engineer and develop process plans for efficient fabrication in a low volume setting

  17. San Francisco Estuary Wetlands Regional Monitoring Program Plan

    E-Print Network [OSTI]

    San Francisco Estuary Wetlands Regional Monitoring Program Plan: Version 1 Framework and Protocols Wetlands Regional Monitoring Program Steering Committee Compiled and Edited by Joshua N. Collins, PhD San ................. 91 #12;#12;Wetlands Regional Monitoring Program Plan 2002 Executive Summary i San Francisco Estuary

  18. Comprehensive Regional Goods Movement Plan and Implementation Strategy

    E-Print Network [OSTI]

    California at Davis, University of

    Comprehensive Regional Goods Movement Plan and Implementation Strategy ON THE MOVE Southern? Nation's largest Metropolitan Planning Organization (MPO) and Council of Governments (COG) 6 counties and Warehousing, $22 Utilities, $10 Mining, $3 Forestry, Fishing, Related Activities and Other, $- 4 Manufacturing

  19. Houston-Galveston Region Public Transportation Coordination Plan 

    E-Print Network [OSTI]

    Houston-Galveston Area Council

    2005-11-17

    stream_source_info Gulf Coast Region Public Transportation Coordination Plan.pdf.txt stream_content_type text/plain stream_size 58694 Content-Encoding ISO-8859-1 stream_name Gulf Coast Region Public Transportation Coordination Plan....pdf.txt Content-Type text/plain; charset=ISO-8859-1 Houston-Galveston Region Public Transportation Coordination Plan Submitted to the Texas Transportation Commission by the Houston-Galveston Area Council and Local Partners...

  20. 1394 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 22, NO. 4, NOVEMBER 2007 Economic Criteria for Planning Transmission

    E-Print Network [OSTI]

    Oren, Shmuel S.

    for Planning Transmission Investment in Restructured Electricity Markets Enzo E. Sauma, Member, IEEE. In reality, however, since the impacts of an electricity transmission project on different players may vary that should be considered when planning electricity transmission investments. We propose an electricity

  1. Abstract--This paper proposes an optimization based method of planning reactive power control for electric transmission

    E-Print Network [OSTI]

    Kumar, Ratnesh

    for electric transmission systems to endow them with the capability of being reconfigured to a secure of the electric transmission system. There are three basic options for strengthening transmission systems: (1-term planning to strengthen transmission capability is necessary to increase future reliability levels

  2. Transmission/Resource Library/Planning | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al., 2013)OpenEnergyTrail Canyon GeothermalTransmissionLibrary/MOUPlanning

  3. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

  4. 2030 Northwest Arkansas Regional Transportation Plan 

    E-Print Network [OSTI]

    Northwest Arkansas Regional Planning Commission

    2006-04-20

    on the Committees below were selected by the chief officials of each participating government or agency to represent them in the transportation planning process. Policy Committee members include Mayors, County Judges, and Chief Executive Officers. Technical Advisory... areas. PARTICIPANTS POLICY COMMITTEE AGENCY TAC Alan Meadors AHTD Planning & Research Steve Mitchell AHTD Transit Danny Chidester Joe Shipman AHTD District 4 AHTD District 9 Steve Lawrence Travis Harp Benton County Michelle Crain Troy Galloway...

  5. The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.

    E-Print Network [OSTI]

    Wiser, Ryan

    2014-01-01

    on U. S . Wind Power Installation, Cost, and Performance30% wind penetration. Wind transmission costs in the severalof Transmission ($/kW-wind) Unit Cost of Transmission ($/

  6. May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAand DOE Safetyof Energy ThisSitesStoragePlanning Efforts | Department of

  7. Ark-Tex Area Regional Public Transportation Coordination Plan 

    E-Print Network [OSTI]

    Ark-Tex Council of Governments

    2006-11-30

    stream_source_info Ark-Tex Area Regional Public Transportation Coordination Plan.pdf.txt stream_content_type text/plain stream_size 55677 Content-Encoding ISO-8859-1 stream_name Ark-Tex Area Regional Public Transportation... Coordination Plan.pdf.txt Content-Type text/plain; charset=ISO-8859-1 KFH GROUP, INC. ARK-TEX AREA REGIONAL PUBLIC TRANSPORTATION COORDINATION PLAN Developed for: ARK-TEX COUNCIL OF GOVERNMENTS By: KFH Group...

  8. Undergraduate Handbook Department of Landscape Architecture and Regional Planning

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    architecture and sustainable design. Studio Projects with Real Clients In many studios and classes, studentsUndergraduate Handbook Department of Landscape Architecture and Regional Planning University of Massachusetts Amherst Bachelor of Science in Landscape Architecture Department of Landscape Architecture

  9. BPA to share costs with PUDs in regional planning project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BPA, Teresa Waugh, 503-230-7536 or 503-230-5131 Innovative agreement: BPA to share costs with PUDs in regional planning project Portland, Ore. - Three public utility districts...

  10. (Dept. of Urban & Regional Planning) WICCI Science Council

    E-Print Network [OSTI]

    Sheridan, Jennifer

    Jim LaGro UW-Madison (Dept. of Urban & Regional Planning) WICCI Science Council October 28, 2011 Unlimited Wisconsin Citizen-Based Monitoring Network Wisconsin Environmental Initiative Wisconsin River

  11. Coordinated Regional Public Transportation Plan: Heart of Texas Region 

    E-Print Network [OSTI]

    Heart of Texas Council of Governments

    2006-12-01

    % Freestone 16.4% 11.4% Hill 17.1 11.1 Limestone 16.4% 11.3% McLennan 13.0% 9.7% HOTCOG Region 14.5% 10.2% State of Texas 9.9% 8.7% Section 2.2.4 ? Automobile Availability Despite the generally lower incomes, automobile availability within the Heart...% Falls 1.65 12.2% Freestone 1.82 6.2% Hill 1.78 5.9% Limestone 1.76 7.8% McLennan 1.68 8.3% HOTCOG Region 1.71 7.9% State of Texas 1.70 7.4% Section 2.3 ? Current Services This section describes the public transportation services currently provided...

  12. 1620 IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 27, NO. 3, JULY 2012 Hybrid AC/DC Transmission Expansion Planning

    E-Print Network [OSTI]

    Fu, Yong

    1620 IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 27, NO. 3, JULY 2012 Hybrid AC/DC Transmission--This paper proposes a hybrid algorithm for the ac/dc transmission expansion planning (TEP). The stochastic simulation method would consider random outages of generating units and ac/dc transmission lines as well

  13. Middle Rio Grande Region Transportation Plan 

    E-Print Network [OSTI]

    Community Council of Southwest Texas, Inc.

    2006-12-01

    with the low education levels in the area. Only fifty-four percent (54%) of the adult population (25+) completed twelve or more years of formal education. Less than 8% of the region?s population has a college degree, and 3.6% have graduate or professional...,780 Communications and Utilities 510 Wholesale Trade 9,390 Retail Trade 7,990 Finance, Insurance, and Real Estate 1,270 Services 18,300 Government 6,450 9 Employment and Business 2000 Census % 2004 Estimate % Age 16+ population 108,693 115...

  14. The 2035 Houston-Galveston Regional Transportation Plan 

    E-Print Network [OSTI]

    Houston-Galveston Area Council

    2007-10-26

    Speeds 7 Regional Freeway/Tollway Map 8 Lane Miles by Category 9 METRO Solutions Transit Plan 10 13-County Regional Transit Providers 11 Regional High Occupancy Vehicle (HOV) Lanes 12 Smart Streets 2035 13 Evacuation Routes 14 Livable Centers 15...-Motorized Freeway Arterial METRO Solutions Bikeway Increase in lane miles 31 52 Increase in Bus Service 50 Increase in lane miles 57 Roadway Even with the implementation of the 2035 RTP, congestion levels will increase over today?s levels...

  15. National Electric Transmission Congestion Study Webinars | Department...

    Energy Savers [EERE]

    Services Electricity Policy Coordination and Implementation Transmission Planning National Electric Transmission Congestion Study National Electric Transmission...

  16. Improving Electricity Resource-Planning Processes by Considering the Strategic Benefits of Transmission

    E-Print Network [OSTI]

    Budhraja, Vikram

    2010-01-01

    impacts of new electricity transmission projects generallyof high- voltage electricity transmission projects, such asby others. Electricity transmission facilities fit these

  17. Transmission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservationBio-Inspired SolarAbout / Transforming Y-12 Transforming Y-12ComplexTransmission

  18. Transmission Planning Process and Opportunities for Utility-Scale Solar Engagement within the Western Electricity Coordinating Council (WECC)

    SciTech Connect (OSTI)

    Hein, J.; Hurlbut, D.; Milligan, M.; Coles, L.; Green, B.

    2011-11-01

    This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. Market barriers unrelated to technology often limit the expansion of utility-scale solar power, even in areas with exceptional resource potential. Many of these non-technical barriers have to do with policy, regulation, and planning, and hardly ever do they resolve themselves in a timely fashion. In most cases, pre-emptive intervention by interested stakeholders is the easiest way to remove/address such barriers, but it requires knowing how to navigate the institutional waters of the relevant agencies and boards. This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. It focuses on the Western Interconnection (WI), primarily because the quality of solar resources in the Southwest makes utility-scale concentrating solar power (CSP) and photovoltaics (PV) economically feasible, and because the relevant institutions have evolved in a way that has opened up opportunities for removing non-technical market barriers. Developers will find in this report a high-level field manual to identify the venues for mitigating and possibly eliminating systemic market obstacles and ensuring that the economic playing field is reasonably level. Project-specific issues such as siting for transmission and generation resources are beyond the scope of this report. Instead, the aim is to examine issues that pervasively affect all utility-scale PV and CSP in the region regardless of where the project may be. While the focus is on the WI, many of the institutions described here also have their counterparts in the Eastern and the Texas interconnections. Specifically, this report suggests a number of critical engagement points relating to generation and transmission planning.

  19. PLANNING FOR WATER CONSERVATION Greater Vancouver Regional District

    E-Print Network [OSTI]

    with increasing populations and costs associated with urban growth--related to infrastructure, energy, operationPLANNING FOR WATER CONSERVATION Greater Vancouver Regional District by Andrew K. Doi B. A in urban areas around the globe, yet per capita water consumption continues to increase. Faced

  20. California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project

    SciTech Connect (OSTI)

    Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

    2004-07-01

    The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

  1. Renewable Electricity Futures Study Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning

    Office of Energy Efficiency and Renewable Energy (EERE)

    This volume focuses on the role of variable renewable generation in creating challenges to the planning and operations of power systems and the expansion of transmission to deliver electricity from remote resources to load centers. The technical and institutional changes to power systems that respond to these challenges are, in many cases, underway, driven by the economic benefits of adopting more modern communication, information, and computation technologies that offer significant operational cost savings and improved asset utilization. While this volume provides background information and numerous references, the reader is referred to the literature for more complete tutorials.

  2. Regional Transportation Coordination Plan for the Capital Area 

    E-Print Network [OSTI]

    Capital Area Regional Transit Coordination Committee

    2006-01-01

    in the State, as defined by the 24 council of government boundaries, should develop a regional coordination plan based on local needs and priorities. The Capital Area planning region includes the following 10 Central Texas counties: ? Llano ? Burnet ? Blanco... Change 2020 to 2030 Bastrop County 57,733 69,932 21% 76,195 9% 99,453 31% 127,344 28% Blanco County 8,418 9,110 8% 10,044 10% 11,916 19% 13,624 14% Burnet County 34,147 41,676 22% 42,694 2% 52,917 24% 63,529 20% Caldwell County 32,194 36,523 13% 40...

  3. Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems

    SciTech Connect (OSTI)

    Mai, T.; Drury, E.; Eurek, K.; Bodington, N.; Lopez, A.; Perry, A.

    2013-01-01

    This report introduces a new capacity expansion model, the Resource Planning Model (RPM), with high spatial and temporal resolution that can be used for mid- and long-term scenario planning of regional power systems. Although RPM can be adapted to any geographic region, the report describes an initial version of the model adapted for the power system in Colorado. It presents examples of scenario results from the first version of the model, including an example of a 30%-by-2020 renewable electricity penetration scenario.

  4. Recovery Act-SmartGrid regional demonstration transmission and distribution (T&D) Infrastructure

    SciTech Connect (OSTI)

    Hedges, Edward T.

    2015-01-31

    This document represents the Final Technical Report for the Kansas City Power & Light Company (KCP&L) Green Impact Zone SmartGrid Demonstration Project (SGDP). The KCP&L project is partially funded by Department of Energy (DOE) Regional Smart Grid Demonstration Project cooperative agreement DE-OE0000221 in the Transmission and Distribution Infrastructure application area. This Final Technical Report summarizes the KCP&L SGDP as of April 30, 2015 and includes summaries of the project design, implementation, operations, and analysis performed as of that date.

  5. Flexible gas insulated transmission line having regions of reduced electric field

    DOE Patents [OSTI]

    Cookson, Alan H. (Pittsburgh, PA); Fischer, William H. (Wilkins Township, Allegheny County, PA); Yoon, Kue H. (Pittsburgh, PA); Meyer, Jeffry R. (Penn Hills Township, Allegheny County, PA)

    1983-01-01

    A gas insulated transmission line having radially flexible field control means for reducing the electric field along the periphery of the inner conductor at predetermined locations wherein the support insulators are located. The radially flexible field control means of the invention includes several structural variations of the inner conductor, wherein careful controlling of the length to depth of surface depressions produces regions of reduced electric field. Several embodiments of the invention dispose a flexible connector at the predetermined location along the inner conductor where the surface depressions that control the reduced electric field are located.

  6. CDKN-CARICOM-Trinidad and Tobago-A Regional Implementation Plan...

    Open Energy Info (EERE)

    CDKN-CARICOM-Trinidad and Tobago-A Regional Implementation Plan for CARICOM's Regional Climate Change Resilience Framework Redirect page Jump to: navigation, search REDIRECT...

  7. Identifying environmental and agricultural values and opportunities for regional planning:a GIS approach

    E-Print Network [OSTI]

    McCoy, Michael C.; Quinn, James F.; Kalman, Naomi B.

    2002-01-01

    For Regional Planning: A GIS Approach Information Center forof the best available region-wide GIS data depicting naturalown extensive holdings of GIS data, surveyed metadata from

  8. RTSTEP regional transportation simulation tool for emergency planning - final report.

    SciTech Connect (OSTI)

    Ley, H.; Sokolov, V.; Hope, M.; Auld, J.; Zhang, K.; Park, Y.; Kang, X.

    2012-01-20

    Large-scale evacuations from major cities during no-notice events - such as chemical or radiological attacks, hazardous material spills, or earthquakes - have an obvious impact on large regions rather than on just the directly affected area. The scope of impact includes the accommodation of emergency evacuation traffic throughout a very large area; the planning of resources to respond appropriately to the needs of the affected population; the placement of medical supplies and decontamination equipment; and the assessment and determination of primary escape routes, as well as routes for incoming emergency responders. Compared to events with advance notice, such as evacuations based on hurricanes approaching an affected area, the response to no-notice events relies exclusively on pre-planning and general regional emergency preparedness. Another unique issue is the lack of a full and immediate understanding of the underlying threats to the population, making it even more essential to gain extensive knowledge of the available resources, the chain of command, and established procedures. Given the size of the area affected, an advanced understanding of the regional transportation systems is essential to help with the planning for such events. The objectives of the work described here (carried out by Argonne National Laboratory) is the development of a multi-modal regional transportation model that allows for the analysis of different evacuation scenarios and emergency response strategies to build a wealth of knowledge that can be used to develop appropriate regional emergency response plans. The focus of this work is on the effects of no-notice evacuations on the regional transportation network, as well as the response of the transportation network to the sudden and unusual demand. The effects are dynamic in nature, with scenarios changing potentially from minute to minute. The response to a radiological or chemical hazard will be based on the time-delayed dispersion of such materials over a large area, with responders trying to mitigate the immediate danger to the population in a variety of ways that may change over time (e.g., in-place evacuation, staged evacuations, and declarations of growing evacuation zones over time). In addition, available resources will be marshaled in unusual ways, such as the repurposing of transit vehicles to support mass evacuations. Thus, any simulation strategy will need to be able to address highly dynamic effects and will need to be able to handle any mode of ground transportation. Depending on the urgency and timeline of the event, emergency responders may also direct evacuees to leave largely on foot, keeping roadways as clear as possible for emergency responders, logistics, mass transport, and law enforcement. This RTSTEP project developed a regional emergency evacuation modeling tool for the Chicago Metropolitan Area that emergency responders can use to pre-plan evacuation strategies and compare different response strategies on the basis of a rather realistic model of the underlying complex transportation system. This approach is a significant improvement over existing response strategies that are largely based on experience gained from small-scale events, anecdotal evidence, and extrapolation to the scale of the assumed emergency. The new tool will thus add to the toolbox available to emergency response planners to help them design appropriate generalized procedures and strategies that lead to an improved outcome when used during an actual event.

  9. The Ohio State University Knowlton School of Architecture, City and Regional Planning

    E-Print Network [OSTI]

    Clark, Bunny

    The Ohio State University Knowlton School of Architecture, City and Regional Planning Approved by the College of Arts and Sciences City and Regional Planning Minor (CRPLAN-MN) Knowlton School of Architecture, City and Regional Planning Program, Knowlton Hall, 275 West Woodruff Avenue, Columbus, OH 43210 614

  10. Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems

    Broader source: Energy.gov [DOE]

    In this report, we introduce a new transparent regional capacity expansion model with high spatio-temporal resolution and detailed representation of dispatch. The development of this model, referred to as the Resource Planning Model (RPM), is motivated by the lack of a tool in the public domain that can be used to characterize optimal regional deployment of resources with detailed dispatch modeling. In particular, RPM is designed to evaluate scenarios of renewable technology deployment to meet renewable portfolio standard (RPS) and emission-reduction goals, and to project possible deployment levels for various projections of future technology and fuel prices.

  11. Energy Efficiency in Western Utility Resource Plans: Impacts on Regional Resources Assessment and Support for WGA Policies

    E-Print Network [OSTI]

    Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

    2006-01-01

    technical reports on utility resource planning in the Westof reports on utility resource planning in the West preparedindividual utilities’ resource planning processes; regional

  12. Planning for a regional rail system : analysis of high speed and high quality rail in the Basque region

    E-Print Network [OSTI]

    Lewis, Paul R. S. (Paul Robinson S.)

    2011-01-01

    The goal of this thesis is to provide guidance for regional rail network planning to achieve the maximum benefits in terms of economic growth, passenger satisfaction, and environmental sustainability. The hypothesis is ...

  13. Puget Sound Area Electric Reliability Plan. Appendix E: Transmission Reinforcement Analysis : Draft Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1991-09-01

    Five transmission line options and several reactive (voltage support) options are presently being considered as possible solutions to the PSAERP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. These options were derived from earlier study work that was summarized in Puget Sound Reinforcement Transmission Options'' and New Cross Mountain Transmission Line Alternative: The Crosstie'', which are attached. The initial Transmission Options study report recognized the value to system performance of adding an entirely new circuit rather than rebuilding an existing one. However, siting realities require that rebuild options be considered. Typically, the most attractive rebuild options would be the lowest capacity (lowest voltage) circuits. But because of corridor location, length and terminal proximity, the rebuild options listed below appear to be the most promising. Schematic diagrams and QV Curves of each option are also attached. It should be noted that Snoqualmie and Echo Lake refer to the same station east of Puget Sound and Naneum and Kittitas refer to the same station in the Ellensburg area. 100 figs., 20 tabs.

  14. National Clean Energy Business Plan Competition: Six Regional...

    Office of Environmental Management (EM)

    of KAir Battery Southeastern Region Winner 2 of 5 Southeastern Region Winner Energy Internet won the ACC Clean Energy Challenge for its software system that addresses cyber and...

  15. Plans and Project in the Upper Great Plains Region

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Planning Projects Studies WindHydro Integration Feasibility Study Dakotas Wind Study Summary (144kb pdf) For more information, contact Dirk Shulund by email or by phone at...

  16. Transmission Expansion in Argentina 5: The Regional Electricity Forum of Buenos Aires Province

    E-Print Network [OSTI]

    Littlechild, Stephen C.; Ponzano, Eduardo A.

    stream_source_info 0762&EPRG0729.pdf.txt stream_content_type text/plain stream_size 138347 Content-Encoding UTF-8 stream_name 0762&EPRG0729.pdf.txt Content-Type text/plain; charset=UTF-8 Transmission expansion in Argentina 5... consumers, but this does not require the regulator to lead or monitor the detail of the process. Key words: Argentina, electricity, transmission, regulation. JEL classification: L33, L51, L94, L98...

  17. California's electricity system of the future scenario analysis in support of public-interest transmission system R&D planning

    SciTech Connect (OSTI)

    Eto, Joseph; Stovall, John P.

    2003-04-01

    The California Energy Commission directed the Consortium for Electric Reliability Technology Solutions to analyze possible future scenarios for the California electricity system and assess transmission research and development (R&D) needs, with special emphasis on prioritizing public-interest R&D needs, using criteria developed by the Energy Commission. The scenarios analyzed in this report are not predictions, nor do they express policy preferences of the project participants or the Energy Commission. The public-interest R&D needs that are identified as a result of the analysis are one input that will be considered by the Energy Commission's Public Interest Energy Research staff in preparing a transmission R&D plan.

  18. California's electricity system of the future scenario analysis in support of public-interest transmission system R&D planning

    E-Print Network [OSTI]

    Eto, Joseph; Stovall, John P.

    2003-01-01

    Impacts of Electricity Transmission Scenario Analysis forImpacts of Electricity Transmission Scenario Analysis forhas also commissioned Electricity Transmission Research and

  19. Land reform, regional planning and socioeconomic development in Brazil

    E-Print Network [OSTI]

    Souza, Saulo

    2011-01-11

    : i) The scope for plan-led strategies towards sustainable development in the countryside has been given less than sufficient emphasis in the land reform literature; ii) There is not clear evidence that the market-based approach leads to higher...

  20. Gulf of Maine Strategic Regional Ocean Science Plan

    E-Print Network [OSTI]

    Pederson, Judith

    The Gulf of Maine Regional Ocean Science Initiative evolved from an awareness of the importance of integrated approaches to addressing ecological, environmental, and social influences in coastal and marine ecosystems at ...

  1. Integrating regional strategic transportation planning and supply chain management : along the path to sustainability

    E-Print Network [OSTI]

    Sgouridis, Sgouris P

    2005-01-01

    A systems perspective for regional strategic transportation planning (RSTP) for freight movements involves an understanding of Supply Chain Management (SCM). This thesis argues that private sector freight shippers and ...

  2. Improving Electricity Resource-Planning Processes by Considering the Strategic Benefits of Transmission

    E-Print Network [OSTI]

    Budhraja, Vikram

    2010-01-01

    renewable and fuel based), new transmission, and energy conservation. Extreme- Event Benefits (Renewable Energy and Energy Efficiency Stakeholder Consensus – Delphi Approach Assemble stakeholders Define societal benefitrenewable energy resources and reduce greenhouse gas emissions. Incorporating more formal evaluations of these important benefits

  3. Improving Electricity Resource-Planning Processes by Consideringthe Strategic Benefits of Transmission

    SciTech Connect (OSTI)

    Budhraja, Vikram; Mobasheri, Fred; Ballance, John; Dyer, Jim; Silverstein, Alison; Eto, Joseph

    2009-03-02

    Current methods of evaluating the economic impacts of new electricity transmission projects fail to capture the many strategic benefits of these projects, such as those resulting from their long life, dynamic changes to the system, access to diverse fuels, and advancement of public policy goals to integrate renewable-energy resources and reduce greenhouse gas emissions.

  4. Planning and processing of new or upgraded electric transmission systems in New Mexico

    SciTech Connect (OSTI)

    Toole, Gasper Loren [Los Alamos National Laboratory

    2009-01-01

    RETA has been requested to identify and prioritize renewable energy resource zones in New Mexico that have a potential to support industry development among renewable energy developers for renewable resource generation projects. Moreover, Senate Memorial 44 requests that RETA identify and prioritize the best viable options for potential transmission corridors to accommodate renewable energy export from New Mexico in accordance with a defined time-line and to convene a working group to submit recommendations to the legislature for establishing a process to streamline procedures for establishing renewable energy transmission projects in New Mexico. RETA's July 9, 2009 request for comments outlined seven topical areas of specific value to Senate Memorial 44. This document addresses Topics 1, 3 and 4.

  5. Framework for designing regional planning architecture for APTS-enabled regional multimodal public transportation system

    E-Print Network [OSTI]

    Zakaria, Zulina

    2004-01-01

    Unsustainable transportation systems have been the cause of many problems facing urban areas around the world. Lack of regard for sustainable development considerations by those responsible for planning and implementing ...

  6. Assessing climate impacts of planning policies-An estimation for the urban region of Leipzig (Germany)

    SciTech Connect (OSTI)

    Schwarz, Nina Bauer, Annette Haase, Dagmar

    2011-03-15

    Local climate regulation by urban green areas is an important urban ecosystem service, as it reduces the extent of the urban heat island and therefore enhances quality of life. Local and regional planning policies can control land use changes in an urban region, which in turn alter local climate regulation. Thus, this paper describes a method for estimating the impacts of current land uses as well as local and regional planning policies on local climate regulation, using evapotranspiration and land surface emissivity as indicators. This method can be used by practitioners to evaluate their policies. An application of this method is demonstrated for the case study Leipzig (Germany). Results for six selected planning policies in Leipzig indicate their distinct impacts on climate regulation and especially the role of their spatial extent. The proposed method was found to easily produce a qualitative assessment of impacts of planning policies on climate regulation.

  7. Environmental analysis and prediction of transmission loss in the region of the New England Shelfbreak

    E-Print Network [OSTI]

    Hornick, Heather René

    2009-01-01

    A confluence of several coastal oceanographic features creates an acoustically interesting region with high variability along the New England Shelfbreak. Determining the effect of the variability on acoustic propagation ...

  8. VP of Transmission System Asset Management for Desert Southwest Region (Maintenance Manager)

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Maintenance (G5000) 615 S. 43rd Avenue Phoenix, AZ 85009...

  9. ARM - Lesson Plans: Climate in the Pacific Region

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Comments?govInstrumentsnoaacrnBarrow, Alaska Outreach Home Room News PublicationsClimate in the Pacific Region

  10. Grenada-Regional Implementation Plan for CARICOM's Climate Change

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIXsource History View New PagesInformation RegionalGreenvironment plcGregsonResilience

  11. Transmission Grid Integration | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    utility operations, engage in transmission planning forums, and model generator output. More information on transmission grid integration is available in the Transmission...

  12. California's electricity system of the future scenario analysis in support of public-interest transmission system R&D planning

    E-Print Network [OSTI]

    Eto, Joseph; Stovall, John P.

    2003-01-01

    asset monitoring and analysis tools for reliability management B. Transmission power-asset monitoring and analysis tools for reliability management. B. Transmission power-asset monitoring and analysis tools for reliability management. B. Transmission power-

  13. Urban & Regional Planning Recommended Readings Beatley, Timothy. Green urbanism: learning from European cities. Island Press, 2000.

    E-Print Network [OSTI]

    Papalambros, Panos

    European cities. Island Press, 2000. illustrates how European cities address different environment. The Regional City: Planning for the End of Sprawl. Covelo, CA: Island Press. 2001. "articulately advocates. Klinenberg, Eric. Heat wave: a social autopsy of disaster in Chicago. Chicago: University of Chicago Press

  14. Sixth Northwest Conservation and Electric Power Plan Chapter 14: Regional Adequacy Standards

    E-Print Network [OSTI]

    ) to assess the adequacy of the North American bulk power supply. In 2005, the Council and the Bonneville Power Administration created the Northwest Resource Adequacy Forum to aid the Council in developingSixth Northwest Conservation and Electric Power Plan Chapter 14: Regional Adequacy Standards

  15. Wetlands Regional Monitoring Program Plan 2002 Part 2: Data Collection Protocols Sediment Contaminants

    E-Print Network [OSTI]

    Wetlands Regional Monitoring Program Plan 2002 Part 2: Data Collection Protocols Sediment Contaminants WRMP Version 1 June 2002 1 Data Collection Protocol Tidal Wetland Sediment Contamination Joshua N Concerns about intertidal sediment contamination are increasing in the Bay Area. There is concern

  16. CITY AND REGIONAL PLANNING Cornell University 106 West Sibley Hall Ithaca, New York 14853

    E-Print Network [OSTI]

    Walter, M.Todd

    CITY AND REGIONAL PLANNING Cornell University · 106 West Sibley Hall · Ithaca, New York 14853 Tel@cornell.edu)isDirectoroftheNewYorkStateWaterResourcesInstituteatCornell University. BrianG.Rahm(bgr4, New York 14853 Tel: (607) 255-4331 · Fax: (607) 255-1971 · www.crp.cornell.edu Whatistheissue? In2009

  17. Planning for sustainable communities: Regional incentives and local policy under SB375

    E-Print Network [OSTI]

    California at Davis, University of

    -Claudia Sciara, Ph.D., AICP Urban Land Use and Transportation Center University of California, Davis Policy Institute Policy for Energy, Environment and the Economy University of California, Davis March 19, 2014Sacramento Los Angeles S.F. Bay Area Land use component of regional transportation plans #12;2013 SB375

  18. A Comprehensive Approach to Bi-National Regional Energy Planning in the Pacific Northwest

    SciTech Connect (OSTI)

    Matt Morrison

    2007-12-31

    The Pacific NorthWest Economic Region, a statutory organization chartered by the Northwest states of Alaska, Washington, Idaho, Montana, and Oregon, and the western Canadian provinces of British Columbia, Alberta, and the Yukon through its Energy Working Group launched a bi-national energy planning initiative designed to create a Pacific Northwest energy planning council of regional public/private stakeholders from both Canada and the US. There is an urgent need to deal with the comprehensive energy picture now before our hoped for economic recovery results in energy price spikes which are likely to happen because the current supply will not meet predicted demand. Also recent events of August 14th have shown that our bi-national energy grid system is intricately interdependent, and additional planning for future capacity is desperately needed.

  19. Regional power systems planning: a state of the art assessment. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-10-01

    The purpose of this report was to define regional power systems planning problems, the tools available and their shortcomings, and to document all of the above in a concise readable form. The approach consisted of a survey and literature search. The survey determined the tools being used by utilities, the tools they had rejected, and the tools they planned to try out. The literature search was conducted for the purpose of documenting the tools available, and performing a comparative analysis of these tools. The project included a mix of utility, university, and consulting organizations. Several organizations were consulted in the selection of the participants. A non-profit organization, The University of Oklahoma, was selected to manage the project. The results were reviewed in a series of four one day meetings by known authorities in each field. This report consists of the results of this project. Perhaps its major finding is that several aspects of the regional planning problem are not well defined, the roles of the various participants in regional planning is not clear, and certainly research is needed for the development of new methodology.

  20. Abstract--The transmission system plays an essential role in the new deregulated scenario. Aspects such as planning are

    E-Print Network [OSTI]

    Catholic University of Chile (Universidad Católica de Chile)

    . · Energy prices determined by the congestion of the transmission system's lines are impacted. II1 Abstract-- The transmission system plays an essential role in the new deregulated scenario this methodology are the expanded transmission system and the agents involved in the expansion, together

  1. Assessing the health equity impacts of regional land-use plan making: An equity focussed health impact assessment of alternative patterns of development of the Whitsunday Hinterland and Mackay Regional Plan, Australia (Short report)

    SciTech Connect (OSTI)

    Gunning, Colleen; Harris, Patrick; Mallett, John

    2011-07-15

    Health service and partners completed an equity focussed health impact assessment to influence the consideration of health and equity within regional land-use planning in Queensland, Australia. This project demonstrated how an equity oriented assessment matrix can assist in testing regional planning scenarios. It is hoped that this HIA will contribute to the emerging interest in ensuring that potential differential health impacts continue to be considered as part of land-use planning processes.

  2. Advanced Studies in Real Estate Development The Department of Urban and Regional Planning, in cooperation with the College of

    E-Print Network [OSTI]

    McQuade, D. Tyler

    Advanced Studies in Real Estate Development The Department of Urban and Regional Planning, in cooperation with the College of Business, offers coursework in Advanced Studies in Real Estate Development which provides an opportunity for graduate students in urban and regional planning or real estate

  3. Polarimetry of thin metal transmission gratings in the resonance region and its impact on the response of metal-semiconductor-metal

    E-Print Network [OSTI]

    Polarimetry of thin metal transmission gratings in the resonance region and its impact on the response of metal-semiconductor-metal photodetectors Erli Chena) and Stephen Y. Chou Department Received 17 December 1996; accepted for publication 4 March 1997 The resonance behavior of metal

  4. Strategic environmental assessment of energy planning tools. A study of Italian regions and provinces

    SciTech Connect (OSTI)

    De Montis, Andrea

    2014-04-01

    SEA has been applied in different ways in EU energy and environmental planning instruments, because different member states have interpreted European Directive 2001/42/CE in a variety of ways. Italy, for example, has only recently completed the integration of the directive into its legislation, through a number of decrees which were approved between 2006 and 2010. As a result SEA practice in Italy is very fragmented, particularly with respect to energy planning, and needs to be steered towards homogeneous quality objectives. The aim of this paper is to study the quality of the SEA reports on the energy and environmental planning tools used by Italian regions and provinces. We study nine cases and use the methodology suggested by Fisher (2010) in his review of the quality of SEA. To be more precise, we integrate the views of external evaluators with those of a selection of the personnel directly involved in preparing the plans. Our results show that there are some differences in the quality scores given by the outsiders and insiders, although the two groups identified similar strengths and weaknesses in implementing SEA. - Highlights: • This is a comparative study on SEA report quality within Italian energy planning tools. • In Italy, the level of SEA implementation on energy planning is still poor. • External academic experts and internal officers assessed SEA reports' quality. • Outsiders and insiders unveil a similar judgement. • Most critical remarks concern consultation, monitoring measures, and follow-up.

  5. Prospects for Photovoltaics in Sunny and Arid Regions: A Solar Grand Plan for Chile

    E-Print Network [OSTI]

    -Chile) #12;Chile: The Atacama Solar Resource Capacity: 4.6 GW Load: 15.4 TWh 50 MW 99 MW Station Horizontal,000-40,000 2,000-14,000 2,000-21,000 302 323 442 Installed capacity of renewable energies 1236 [MW] PotentialProspects for Photovoltaics in Sunny and Arid Regions: A Solar Grand Plan for Chile Part I

  6. Introduction to the Fifth Power Plan The Council's first power plan, adopted in 1983, was developed in the aftermath of the region's

    E-Print Network [OSTI]

    in the aftermath of the region's effort to construct five nuclear power plants. Although only one of the powerIntroduction to the Fifth Power Plan The Council's first power plan, adopted in 1983, was developed and methods for assessing and managing the risks associated with capital-intensive, long lead-time generation

  7. Striking a Balance Between Energy and the Environment in the Columbia River Basin Regional Power Plan Touts Efficiency to Meet

    E-Print Network [OSTI]

    and utilities need new generation in addition to renewable power and efficiency improvements. Natural gas Plan Touts Efficiency to Meet Demand and Create Jobs (Continued on page 2) Northwest Power its regional power plan at its February meet- ing, calling for efficiency, as much as 85 percent

  8. Implications of Model Configurations on Capacity Planning Decisions: Scenario Case Studies of the Western Interconnection and Colorado Region using the Resource Planning Model

    Broader source: Energy.gov [DOE]

    In this report, we analyze the impacts of model configuration and detail in capacity expansion models, computational tools used by utility planners looking to find the least cost option for planning the system and by researchers or policy makers attempting to understand the effects of various policy implementations. The present analysis focuses on the importance of model configurations—particularly those related to capacity credit, dispatch modeling, and transmission modeling—to the construction of scenario futures. Our analysis is primarily directed toward advanced tools used for utility planning and is focused on those impacts that are most relevant to decisions with respect to future renewable capacity deployment. To serve this purpose, we develop and employ the NREL Resource Planning Model to conduct a case study analysis that explores 12 separate capacity expansion scenarios of the Western Interconnection through 2030.

  9. The Purdue Water Community Strategic Plan for 2011-2016 Interdisciplinary solutions for sustainable global and regional water resource

    E-Print Network [OSTI]

    The Purdue Water Community Strategic Plan for 2011-2016 Interdisciplinary solutions for sustainable global and regional water resource Vision The Purdue Water Community (PWC) is a vibrant, interconnected information focused on solving global and regional water challenges. Mission The Purdue Water Community

  10. DRAFT WORKING PAPER JULY 2006 DO NOT QUOTE OR CITE Topological Elements of Transmission Pricing and Planning

    E-Print Network [OSTI]

    Blumsack, Seth

    -management or systems problem and not one of identifying specific beneficiaries. 1. The Transmission Puzzle The blackout the official blackout report issued by the joint U.S.-Canadian task force (Blackout Task Force 2003) avoided built in the U.S. using market-based compensation (Joskow 2005b). Largely in response to the blackout

  11. California's electricity system of the future scenario analysis in support of public-interest transmission system R&D planning

    E-Print Network [OSTI]

    Eto, Joseph; Stovall, John P.

    2003-01-01

    energy cost/value; and electricity system reliability, quality, and sufficiency are all CaliforniaCalifornia to increase energy self-sufficiency and reliability Greater Regional Coordination Maturing regional processes for equitable sharing of cost and

  12. Introduction to the Fifth Power Plan The Council's first power plan, adopted in 1983, was developed in the aftermath of the region's

    E-Print Network [OSTI]

    in retail rates in the region in the early 1980s. This caused demand to plummet and caused economic hardship to electricity system planning. These included recognition of the price elasticity of demand in forecasting. It also furthered electricity policy innovations such as treating conservation, the more efficient use

  13. Designing electricity transmission auctions

    E-Print Network [OSTI]

    Greve, Thomas; Pollitt, Michael G.

    2012-10-26

    The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

  14. Planning electricity transmission to accommodate renewables: Using two-stage programming to evaluate flexibility and the cost of disregarding uncertainty

    E-Print Network [OSTI]

    van der Weijde, Adriaan Hendrik; Hobbs, Benjamin F.

    2011-01-31

     Niall Duncan (Univ. Edinburgh) for generating the hydro output data and to  lex Haffner  (National  Grid)  for  supplying  the  demand  data.  However,  any  errors  or  views  expressed  are  ntirely our own responsibility.  A e   2  A at...   system. The resulting model is then used to determine the optimally expansion plan under  uncertainty. We compare  these  results  to  those  that would occur under more  traditional  planning methods...

  15. Modeling Interregional Transmission Congestion in the National Energy Modeling System

    E-Print Network [OSTI]

    Gumerman, Etan; Chan, Peter; Lesieutre, Bernard; Marnay, Chris; Wang, Juan

    2006-01-01

    NEMS does not track electricity transmission within regions,international electricity transmission with Canada andwhen solving for electricity transmission, the coal plants

  16. State and Regional Comprehensive Carbon Pricing and Greenhouse Gas Regulation in the Power Sector under the EPA's Clean Power Plan

    E-Print Network [OSTI]

    California at Davis, University of

    1 State and Regional Comprehensive Carbon Pricing and Greenhouse Gas Regulation in the Power Sector under the EPA's Clean Power Plan UC Davis Policy Institute, Resources for the Future, Next 10 November:30 Welcome; background information · California, AB32, the trading program, other policies in electricity

  17. Environmental Planning and Policy in the Los Angeles Region: Openings and Opportunities

    E-Print Network [OSTI]

    FitzSimmons, Margaret; Gottlieb, Robert

    1994-01-01

    of Federal environmental policy and regulation since thein decisions about environmental policy and its costs andand inadequately. Environmental policy and planning gridlock

  18. Collaboration and Equity in Regional Sustainability Planning in California: Challenges in Implementation

    E-Print Network [OSTI]

    Frick, Karen Trapenberg; Chapple, Karen; Mattiuzzi, Elizabeth; Zuk, Miriam

    2015-01-01

    2014). Figure 1. Smart Valley Places Cities Source: Smartin each of the Smart Valley Places cities. The theory ofUrbanism, Smart Growth and the Ecological City. ” Planning

  19. An analysis of stakeholder perspectives on Texas Regional Water Planning and Management 

    E-Print Network [OSTI]

    Collins, Kimberley A

    2000-01-01

    management strategies and planning considerations. The purpose is to identify points of consensus and points of divergence in order to develop a water plan for Texas that is fair and equitable. When a conflict is interest-based, as it is in the case of water...

  20. Environmental Planning and Policy in the Los Angeles Region: Openings and Opportunities

    E-Print Network [OSTI]

    FitzSimmons, Margaret; Gottlieb, Robert

    1994-01-01

    discourse in the area of environmental policy. Perhaps mostabout appropriate regional environmental policy seems todaydevelopment of Federal environmental policy and regulation

  1. Plan

    National Nuclear Security Administration (NNSA)

    Information P.O. Box 62 Oak Ridge, TN 37831-0062 (423) 576-8401 DOENV-11432-244 Nevada Test Site Routine Radiological Environmental Monitoring Plan December 1998 Work Performed...

  2. International workshop: Planning for climate change through integrated coastal management. Volume 2: Country and regional reports

    SciTech Connect (OSTI)

    NONE

    1998-12-31

    This workshop included reports from the following countries: Argentina; Bulgaria; Egypt; Estonia; Fiji; Indonesia; Mozambique; Nigeria; Oman; The Philippines; Senegal; Sri Lanka; Suriname; Thailand; and Tuvalu; Regional reports were included on the following: Small Island Developing States of the Pacific; South Pacific Regional Environment Program; and Sea Level Rise Impacts on Central America.

  3. Energy Efficiency in Western Utility Resource Plans: Impacts onRegional Resources Assessment and Support for WGA Policies

    SciTech Connect (OSTI)

    Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

    2006-08-01

    In the aftermath of the consumer price shocks and short-term power shortages of the 2000-01 electricity crisis, policymakers and regulators in Western states are placing increased emphasis on integrated resource planning (IRP), resource adequacy and assessment and a diversified portfolio of resources to meet the needs of electricity consumers. In some states, this has led to a resurgence in state and utility commitments to energy efficiency. Increasing interest in acquiring energy efficiency as a power-system resource is also driven by the desire to dampen high growth rates in electricity demand in some Western states, rapid increases in natural gas prices, concerns about the environmental impacts of electricity generation (e.g. water consumption by power plants, air quality), and the potential of energy efficiency to provide utility bill savings for households and businesses (WGA CDEAC 2006). Recognizing the cost-competitiveness and environmental benefits of energy efficiency, the Western Governor's Association (WGA) has set a high priority for energy efficiency, establishing a goal of reducing projected electricity demand by 20% across the West by 2020 in a policy resolution on Clean and Diversified Energy for the West (WGA 2004). Nationally, the need for improved tracking of demand-side resources in load forecasting is formalized in the North American Electric Reliability Council (NERC)'s recently adopted reliability standards, which utilities and regional reliability organizations will need to comply with (NERC 2005a and 2005b). In this study, we examine the treatment of energy efficiency in recent resource plans issued by fourteen investor-owned utilities (IOUs) in the Western United States and Canada. The goals of this study are to: (1) summarize energy-efficiency resources as represented in a large sample of recent resource plans prepared by Western utilities and identify key issues; (2) evaluate the extent to which the information provided in current resource plans can be used to support region-wide resource assessment and tracking of state/utility progress in meeting the WGA's energy-efficiency goals (WGA 2004); and (3) offer recommendations on information and documentation of energy-efficiency resources that should be included in future resource plans to facilitate comparative review and regional coordination. The scope of this report covers projected electric end-use efficiency investments reported in all Western utility resource plans that were publicly available as of February 2006. While a few utilities included additional demand-side resources, such as demand response, in their plans, we do not report that information. However, many of the issues and recommendations in reference to energy efficiency in this report are relevant to other demand-side resources as well. This report is organized as follows. Section 2 outlines the data sources and approach used in this study and conceptualizes methods and metrics for tracking energy-efficiency resources over time. Section 3 presents results from the review of the utility resource plans. Important issues encountered in reviewing the resource plans are discussed in section 4. Finally, section 5 concludes with recommendations for improving the tracking and reporting of energy efficiency in forthcoming resource plans.

  4. Planning for Water Scarcity: The Vulnerability of the Laguna Region, Mexico 

    E-Print Network [OSTI]

    Sanchez Flores, Maria Del Rosario

    2010-10-12

    This dissertation examined declining groundwater availability and management strategies for addressing water shortages in the Laguna region located in the states of Coahuila and Durango. Excessive pumping of groundwater ...

  5. A Study to Assess Needed Improvements and Barriers in Planning and Delivering Agricultural Extension Activities in the Kurdistan Region of Iraq 

    E-Print Network [OSTI]

    Khoshnaw, Yousif Khalid

    2013-07-22

    The purpose of this study was to assess planning and delivering agricultural extension activities in the Kurdistan region of Iraq for future program implementation. The study was a descriptive research and used a modified ...

  6. Transmission Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report1538-1950 Timeline of Events:Smart

  7. Relationships of Light Transmission, Stratification and Fluorescence in the Hypoxic Region of the Texas-Louisiana Shelf in Spring/Summer 2009 

    E-Print Network [OSTI]

    Towns, Jenny L

    2012-07-11

    , the relationship between transmissivity, photosynthetically available radiation (PAR), stratification, and fluorescence are analyzed. PAR is measured using a silicon photovoltaic detector and is measured in the 400 to 700 nm range. A fluorometer is used to measure...

  8. National transmission grid study

    SciTech Connect (OSTI)

    Abraham, Spencer

    2003-05-31

    The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE’s Policy Office Electricity Modeling System (POEMS). DOE’s analysis, presented in Section 2, confirms the central role of the nation’s transmission system in lowering costs to consumers through increased trade. More importantly, DOE’s analysis also confirms the results of previous studies, which show that transmission bottlenecks and related transmission system market practices are adding hundreds of millions of dollars to consumers’ electricity bills each year. A more detailed technical overview of the use of POEMS is provided in Appendix A. DOE led an extensive, open, public input process and heard a wide range of comments and recommendations that have all been considered.1 More than 150 participants registered for three public workshops held in Detroit, MI (September 24, 2001); Atlanta, GA (September 26, 2001); and Phoenix, AZ (September 28, 2001).

  9. Great Plains Wind Energy Transmission Development Project

    SciTech Connect (OSTI)

    Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

    2012-06-09

    In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the EERC, in collaboration with Meridian Environmental Services, developed and demonstrated the efficacy of a wind energy forecasting system for use in scheduling energy output from wind farms for a regional electrical generation and transmission utility. With the increased interest at the time of project award in the production of hydrogen as a critical future energy source, many viewed hydrogen produced from wind-generated electricity as an attractive option. In addition, many of the hydrogen production-related concepts involve utilization of energy resources without the need for additional electrical transmission. For this reason, under Task 4, the EERC provided a summary of end uses for hydrogen in the region and focused on one end product in particular (fertilizer), including several process options and related economic analyses.

  10. Transmission Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Services BPA Clarifications on the DSO216 1 Document updated on 2242015 at 3:29:25 PM B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Clarifications on...

  11. Topic A Awardee: Eastern Interconnection Planning Collaborative...

    Energy Savers [EERE]

    policy makers Consumer and environmental interests Transmission Planning Authorities Market participants generating, transmitting or consuming electricity within the Eastern...

  12. Planning India's long-term energy shipment infrastructures for electricity and coal

    SciTech Connect (OSTI)

    Brian H. Bowen; Devendra Canchi; Vishal Agarwal Lalit; Paul V. Precke; F.T. Sparrow; Marty W. Irwin

    2010-01-15

    The Purdue Long-Term Electricity Trading and Capacity Expansion Planning Model simultaneously optimizes both the expansion of transmission and generation capacity. Most commercial electricity system planning software is limited to only transmission planning. An application of the model to India's national power grid, for 2008-2028, indicates substantial transmission expansion is the cost-effective means of meeting the needs of the nation's growing economy. An electricity demand growth rate of 4% over the 20-year planning horizon requires more than a 50% increase in the Government's forecasted transmission capacity expansion, and 8% demand growth requires more than a six-fold increase in the planned transmission capacity expansion. The model minimizes the long-term expansion costs (operational and capital) for the nation's five existing regional power grids and suggests the need for large increases in load-carrying capability between them. Changes in coal policy affect both the location of new thermal power plants and the optimal pattern inter-regional transmission expansions. 15 refs., 10 figs., 7 tabs.

  13. WECC Variable Generation Planning Reference Book: Appendices

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Du, Pengwei; Etingov, Pavel V.; Ma, Jian; Vyakaranam, Bharat

    2013-05-13

    The document titled “WECC Variable Generation Planning Reference Book”. This book is divided into two volumes; one is the main document (volume 1)and the other is appendices (volume 2). The main document is a collection of the best practices and the information regarding the application and impact of variables generation on power system planning. This volume (appendices) has additional information on the following topics: Probabilistic load flow problems. 2. Additional useful indices. 3. high-impact low-frequency (HILF) events. 4. Examples of wide-area nomograms. 5. Transmission line ratings, types of dynamic rating methods. 6. Relative costs per MW-km of different electric power transmission technologies. 7. Ultra-high voltage (UHV) transmission. 8.High voltage direct current (VSC-HVDC). 9. HVDC. 10. Rewiring of existing transmission lines. 11. High-temperature low sag (HTLS) conductors. 12. The direct method and energy functions for transient stability analysis in power systems. 13.Blackouts caused by voltage instability. 14. Algorithm for parameter continuation predictor-corrector methods. 15. Approximation techniques available for security regions. 16. Impacts of wind power on power system small signals stability. 17. FIDVR. 18. FACTS. 19. European planning standard and practices. 20. International experience in wind and solar energy sources. 21. Western Renewable Energy Zones (WREZ). 22. various energy storage technologies. 23. demand response. 24. BA consolidation and cooperation options. 25. generator power management requirements and 26. European planning guidelines.

  14. Business Plan in Brief : Draft.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1994-06-01

    Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA`s draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA`s first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization.

  15. Interstate Transmission Challenges for Renewable Energy: A Federalism...

    Open Energy Info (EERE)

    structures and cost allocation opportunities to better plan for and site the transmission build out necessary to meet renewable energy goals. Authors Alexandra Klass and Elizabeth...

  16. Proposed Southline Transmission Line Project - Volume 4 of 4...

    Office of Environmental Management (EM)

    2 Appendix J J-1 Southline Transmission Line Project Draft Environmental Impact Statement and Draft Resource Management Plan Amendment BLM LAND USE AUTHORIZATIONS 1...

  17. Ecosystem-scale Selenium Model for the San Francisco Bay-Delta Regional Ecosystem Restoration Implementation Plan

    E-Print Network [OSTI]

    Presser, Theresa S.; Luoma, Samuel N.

    2013-01-01

    experimental ponds. Water, Air, and Soil Pollution 62(1–2):Pollution [SFBRWQCB] California San Francisco Bay Regional Water

  18. Energy Efficiency in Western Utility Resource Plans: Impacts on Regional Resources Assessment and Support for WGA Policies

    E-Print Network [OSTI]

    Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

    2006-01-01

    Goal.6 Figure 2-2. Accounting for Energy Efficiency2-3. Accounting for Energy Efficiency Resources in LoadFigure 3-1. Plan Energy Efficiency Program Effects: Annual

  19. Beyond biology: understanding regional, multi-species habitat conservation plans from an ecological, economic, and sociopolitical perspective 

    E-Print Network [OSTI]

    Schmidt, Jennifer

    2013-02-22

    (Thamnophis gigas), and 49 unlisted species; Purpose ? urban development and agriculture; Permit holder ? Sacramento Co. 16 Tulare As ation of Governments H bitat Conservation Plan ULR: Status? abandoned; Location ? western Tulare Co. , CA; Duration ? 20...

  20. Energy Efficiency in Western Utility Resource Plans: Impacts on Regional Resources Assessment and Support for WGA Policies

    E-Print Network [OSTI]

    Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

    2006-01-01

    5% of total energy requirements for BC Hydro and PacifiCorp1 Avista BC Hydro PacifiCorp PGE Total energy requirementsNorthwestern Energy, and BC Hydro) plan to offset ~30–50% of

  1. Cellular/Molecular Connexin35 Mediates Electrical Transmission at Mixed

    E-Print Network [OSTI]

    Rash, John E.

    Cellular/Molecular Connexin35 Mediates Electrical Transmission at Mixed Synapses on Mauthner Cells regions, suggesting that connexin35-mediated electrical transmission is common in goldfish brain" (electrical and chemical) synaptic terminals that offer the unique opportunity to correlate physiological

  2. Introduction Synaptic transmission

    E-Print Network [OSTI]

    Stoltz, Brian M.

    Introduction ·Synaptic transmission throughout the nervous system is predominantly chemical ·At Channels #12;Neuroreceptors & Synaptic Transmission Synapse Neurotransmitter Receptor/Ion Channel Ion Flow

  3. Merchant transmission investment

    E-Print Network [OSTI]

    Joskow, Paul L.

    2003-01-01

    We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

  4. A Ten Step Protocol and Plan for CCS Site Characterization, Based on an Analysis of the Rocky Mountain Region, USA

    SciTech Connect (OSTI)

    McPherson, Brian; Matthews, Vince

    2013-09-15

    This report expresses a Ten-Step Protocol for CO2 Storage Site Characterization, the final outcome of an extensive Site Characterization analysis of the Rocky Mountain region, USA. These ten steps include: (1) regional assessment and data gathering; (2) identification and analysis of appropriate local sites for characterization; (3) public engagement; (4) geologic and geophysical analysis of local site(s); (5) stratigraphic well drilling and coring; (6) core analysis and interpretation with other data; (7) database assembly and static model development; (8) storage capacity assessment; (9) simulation and uncertainty assessment; (10) risk assessment. While the results detailed here are primarily germane to the Rocky Mountain region, the intent of this protocol is to be portable or generally applicable for CO2 storage site characterization.

  5. 1406 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 22, NO. 4, NOVEMBER 2007 Market-Based Coordination of Transmission

    E-Print Network [OSTI]

    Fu, Yong

    with competitive generation capacity planning in electricity markets. The purpose of the model is a holistic, competitive electricity markets, generation capacity planning, Lagrangian relaxation, merchant transmission simulation of generation and transmission capacity expansion in the market environment. The solution

  6. Transmission eigenvalues for strictly concave domains

    E-Print Network [OSTI]

    Georgi Vodev

    2015-01-05

    We prove that for strictly concave domains much larger transmission eigenvalue-free regions exist. As a consequence, we get Weyl asymptotics for the total counting function with an almost optimal remainder term.

  7. Electrician - Foreman II (Transmission Lines & Substations) ...

    Broader source: Energy.gov (indexed) [DOE]

    Region Transmission Lines and Substation Maintenance (G5200) 615 S. 43rd Avenue Phoenix, AZ 85009 Duty Location is Page, AZ Find out more about living conditions at this...

  8. A Bottom up Approach to on-Road CO2 Emissions Estimates: Improved Spatial Accuracy and Applications for Regional Planning

    E-Print Network [OSTI]

    Hutyra, Lucy R.

    targets for power plants and other point sources, but California's also sets future fuel economy standards Supporting Information ABSTRACT: On-road transportation is responsible for 28% of all U.S. fossil- fuel CO2 emissions. Mapping vehicle emissions at regional scales is challenging due to data limitations. Existing

  9. Department of Energy Announces Plans for Additional Comment Period...

    Office of Environmental Management (EM)

    Department of Energy Announces Plans for Additional Comment Period on National Interest Electric Transmission Corridors Department of Energy Announces Plans for Additional Comment...

  10. Request for Information: Assistance in Target Setting and Strategic Planning for Renewable Energy Deployment at the State and Regional Level

    Broader source: Energy.gov [DOE]

    In order to comply with the Environmental Protection Agency’s Clean Power Plan, states are required to reduce greenhouse gas emissions. One option for compliance is replacing retiring fossil generation with solar-generated electricity. Currently, 29 states, three territories, and Washington, D.C. have renewable portfolio standards (RPS), which have proven to be an effective regulatory means of expanding solar and other clean energy. More than half of the RPSs will reach their peak by 2020, which is driving states to update or create new solar targets. The purpose of this RFI is to solicit feedback from state-level entities, utilities, the solar industry, energy companies, academia, research laboratories, and other stakeholders on issues related to the development of new solar energy targets and deployment strategies at the state level.

  11. 2009 National Electric Transmission Congestion Study - San Francisco...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - San Francisco Workshop 2009 National Electric Transmission Congestion Study - San Francisco Workshop On June 11, 2008, DOE hosted a regional pre-study workshop in San Francisco,...

  12. Transmission Services WIST Task Force Dynamic Transfer Capability...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ("WIST"), a Task Force of technical staff primarily from Northwest and California transmission providers and sub-regional entities, completed a report documenting Phase 1 of its...

  13. BPA, Transmission, presentation on I-5 Corridor Reinforcement...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Meeting growth Building transmission lines is not the only solution to growing demand. The region conserved 200 megawatts in 2007, equal to about half of our annual...

  14. Concurrent Wind Cooling in Power Transmission Lines

    SciTech Connect (OSTI)

    Jake P Gentle

    2012-08-01

    Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

  15. Uncertain Power Flows and Transmission Planning

    E-Print Network [OSTI]

    ). PSERC is a multi-university Center conducting research on challenges facing a restructuring electric For information about this project contact: Gerald T. Heydt Arizona State University Department of Electrical University of Illinois at Urbana-Champaign Department of Electrical and Computer Engineering 1406 W. Green St

  16. Transmission Expansion Planning Using an AC Model ...

    E-Print Network [OSTI]

    Periodicals

    2013-01-02

    Two nonlinear programming (NLP) relaxation models are then proposed by ... H. D. Mittelmann is with the School of Mathematical and Statistical Sci- ences ...... Oct. 1970. [12] R. Fourer, D. M. Gay and B. W. Kernighan, AMPL: A Modeling Lan

  17. Environmental Recommendations for Transmission Planning | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTIONRobertsdale, AlabamaETEC GmbH JumpEllenville,Power Corp Jump to: navigation, search Name:Restore

  18. Interconnection Transmission Planning: Awards | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLforLDRDEnergy Copyrights ASite ForResearch,The documentsCoP)List of

  19. Regional Service Plan South Plains Region 

    E-Print Network [OSTI]

    South Plains Association of Governments

    2010-10-27

    as follows: Adult Day Activity and Health Center Lubbock Bethphage Mission South Lubbock Farwell Convalescent Center Farwell Goodwill Industries of Lubbock Lubbock Hockley County Senior Citizens? Center Levelland Special....3% +1,638,202 16.0% 15.4% 9.9% In FY2005, Citibus carried a total of 3,779,325 passengers; due in large part to high gasoline prices, FY2006 ridership increased in all services with the exception of the Texas Tech University system. The ridership...

  20. Transmission Commercial Project Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open Season (NOS) PTSA Reform North American Energy...

  1. Transmission through the

    E-Print Network [OSTI]

    Yanikomeroglu, Halim

    Optimum Transmission through the GMAC D. Calabuig, R. Gohary, H. Yanikomero. 1/22 Introduction System model Optimization Algorithm Conclusions Optimum Transmission through the Gaussian Multiple Access Engineering Carleton University Ottawa, Canada July 8, 2013 #12;Optimum Transmission through the GMAC D

  2. Performance Incentives for Transmission

    E-Print Network [OSTI]

    Oren, Shmuel S.

    Performance Incentives for Transmission FERC's Standard Market Design should accommodate a performance-based regulation mechanism that is designed to align the interests of transmission operators to investment, transmission investors would be entitled to the CRRs or CRR auc- tion revenues engendered

  3. Transmission Enhancement Technology Report

    E-Print Network [OSTI]

    a recommendation of the most cost-effective methods and technologies to enhance electricity transmission from a review of methods and technologies with potential to enhance electricity transmission capability-traditional methods and technologies to increase the capacity of the high voltage electric power transmission system

  4. Vice President, Planning and Asset Management

    Broader source: Energy.gov [DOE]

    THIS VACANCY ANNOUNCEMENT HAS BEEN MODIFIED TO EXTEND THE CLOSING DATE TO 7/10/2015. Planning and Asset Management is responsible for overseeing Bonneville Power Administration's transmission...

  5. Modeling Interregional Transmission Congestion in the National Energy Modeling System

    E-Print Network [OSTI]

    Gumerman, Etan; Chan, Peter; Lesieutre, Bernard; Marnay, Chris; Wang, Juan

    2006-01-01

    Central Area Reliability Coordination Council EMM region Electricity Capacity Planning submodule of NEMS Energy Efficiency and Renewable

  6. Automated manual transmission controller

    DOE Patents [OSTI]

    Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

    1999-12-28

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  7. Regional Transit Plan for the Central Texas State Planning Region 

    E-Print Network [OSTI]

    Central Texas Regional Transportation Advisory Group

    2006-01-01

    ................................. Worked at home ............................. Mean travel time to work (minutes)' ............ Employed civilian population 16 years and over ..................... OCCUPATION Management. professional. and related... .................................... Professional. scientific. management. adminis- ...... trative. and waste management services ........ Educational. health and social services Arts. entertainment. recreation. accommodation and food services .......................... ... Other services...

  8. Using Natural Gas Transmission Pipeline Costs to Estimate Hydrogen Pipeline Costs

    E-Print Network [OSTI]

    Parker, Nathan

    2004-01-01

    higher demand push US natural gas construction plans. ”Using Natural Gas Transmission Pipeline Costs to Estimatethe construction costs of natural gas, oil, and petroleum

  9. Energy Transmission and Infrastructure

    SciTech Connect (OSTI)

    Mathison, Jane

    2012-12-31

    The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

  10. Regional water planning Milind Sohoni

    E-Print Network [OSTI]

    Sohoni, Milind

    LOCATE: - Villages - Peri-urban area - Farmland - Roads - Stream - Small dam (KT bandhara) - Waste water for irrigation Percolation Fresh water supply Domestic and industrial use Waste water treatment Waste water Discharge waste water recycle Treat and discharge untreated Run-off #12;Urban water cycle DRINKING WATER

  11. Series Transmission Line Transformer

    DOE Patents [OSTI]

    Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

    2004-06-29

    A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

  12. Integrated Energy-Water Planning in the Western and Texas Interconnections

    SciTech Connect (OSTI)

    Vincent Tidwell; John Gasper; Robert Goldstein; Jordan Macknick; Gerald Sehlke; Michael Webber; Mark Wigmosta

    2013-07-01

    While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, and reliability, issues concerning the availability of water represent an emerging issue. Thermoelectric expansion must be considered in the context of competing demands from other water use sectors balanced with fresh and non-fresh water supplies subject to climate variability. An integrated Energy-Water Decision Support System (DSS) is being developed that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water availability and cost for long-range transmission planning. The project brings together electric transmission planners (Western Electricity Coordinating Council and Electric Reliability Council of Texas) with western water planners (Western Governors’ Association and the Western States Water Council). This paper lays out the basic framework for this integrated Energy-Water DSS.

  13. Transmission and Storage Operations

    Energy Savers [EERE]

    Transmission and Storage Operations Natural Gas Infrastructure R&D and Methane Mitigation Workshop Mary Savalle, PMP, LSSGB Compression Reliability Engineer November 12, 2014...

  14. Collaborative Transmission Technology Roadmap

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Addendum to the Collaborative Transmission Technology Roadmap March 2014 Bonneville Power Administration Enhanced PDF Functionality Functionality of the PDF version of this...

  15. Patterns of transmission investment

    E-Print Network [OSTI]

    Joskow, Paul L.

    2005-01-01

    This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

  16. EC Transmission Line Risk Identification and Analysis

    SciTech Connect (OSTI)

    Bigelow, Tim S

    2012-04-01

    The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

  17. Modeling regional power transfers

    SciTech Connect (OSTI)

    Kavicky, J.A.; Veselka, T.D.

    1994-03-01

    The Spot Market Network (SMN) model was used to estimate spot market transactions and prices between various North American Electric Reliability Council (NERC) regions for summer on-peak situations. A preliminary analysis of new or proposed additions to the transmission network was performed. The effects of alternative exempt wholesale generator (EWG) options on spot market transactions and the transmission system are also studied. This paper presents the SMN regional modelling approach and summarizes simulation results. Although the paper focuses on a regional network representation, a discussion of how the SMN model was used to represent a detailed utility-level network is also presented.

  18. Transmission Line Security Monitor

    ScienceCinema (OSTI)

    None

    2013-05-28

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  19. Transmission Line Security Monitor

    SciTech Connect (OSTI)

    2011-01-01

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  20. Magnetic Resonance Imaging-Based Target Volume Delineation in Radiation Therapy Treatment Planning for Brain Tumors Using Localized Region-Based Active Contour

    SciTech Connect (OSTI)

    Aslian, Hossein; Sadeghi, Mahdi; Mahdavi, Seied Rabie; Babapour Mofrad, Farshid; Astarakee, Mahdi; Khaledi, Navid; Fadavi, Pedram

    2013-09-01

    Purpose: To evaluate the clinical application of a robust semiautomatic image segmentation method to determine the brain target volumes in radiation therapy treatment planning. Methods and Materials: A local robust region-based algorithm was used on MRI brain images to study the clinical target volume (CTV) of several patients. First, 3 oncologists delineated CTVs of 10 patients manually, and the process time for each patient was calculated. The averages of the oncologists’ contours were evaluated and considered as reference contours. Then, to determine the CTV through the semiautomatic method, a fourth oncologist who was blind to all manual contours selected 4-8 points around the edema and defined the initial contour. The time to obtain the final contour was calculated again for each patient. Manual and semiautomatic segmentation were compared using 3 different metric criteria: Dice coefficient, Hausdorff distance, and mean absolute distance. A comparison also was performed between volumes obtained from semiautomatic and manual methods. Results: Manual delineation processing time of tumors for each patient was dependent on its size and complexity and had a mean (±SD) of 12.33 ± 2.47 minutes, whereas it was 3.254 ± 1.7507 minutes for the semiautomatic method. Means of Dice coefficient, Hausdorff distance, and mean absolute distance between manual contours were 0.84 ± 0.02, 2.05 ± 0.66 cm, and 0.78 ± 0.15 cm, and they were 0.82 ± 0.03, 1.91 ± 0.65 cm, and 0.7 ± 0.22 cm between manual and semiautomatic contours, respectively. Moreover, the mean volume ratio (=semiautomatic/manual) calculated for all samples was 0.87. Conclusions: Given the deformability of this method, the results showed reasonable accuracy and similarity to the results of manual contouring by the oncologists. This study shows that the localized region-based algorithms can have great ability in determining the CTV and can be appropriate alternatives for manual approaches in brain cancer.

  1. Transmission Design at the National Level: Benefits, Risks and Possible Paths Forward

    E-Print Network [OSTI]

    Electric Energy System #12;Transmission Design at the National Level: Benefits, Risks and Possible Paths Planning, Western Electricity Coordinating Council (WECC) · Dale Osborn, Consulting Advisor, Transmission to move electric energy interregionally is limited to the capacity of the existing transmission system

  2. EIS-0411: Transmission Agency of Northern California Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

  3. Lawrence Berkeley Laboratory FY 1994 site development plan

    SciTech Connect (OSTI)

    Not Available

    1994-04-15

    This plan describes the mission, workload, site population, site and regional information, program projections and requirements, master plan, five-year construction plan, and management considerations.

  4. Down hole transmission system

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

    2007-07-24

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

  5. Downhole transmission system

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

    2008-01-15

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

  6. Patterns of Transmission Investment

    E-Print Network [OSTI]

    Joskow, Paul

    2006-03-14

    influenced by uncertainty, contingency criteria and associated engineering reliability rules. I illustrate how the wholesale market and transmission investment frameworks have addressed these issues in England and Wales (E&W) since 1990 and in the PJM...

  7. Transmission and Storage Operations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsState ofSavingsTransmission SEAB PresentationTransmission and

  8. The Road Map For Regional Coordinated Public Transportation West Texas/El Paso Region 

    E-Print Network [OSTI]

    West Texas/El Paso Regional Coordinated Transportation Planning Coalition

    2006-12-01

    -1 THE ROAD MAP FOR REGIONAL COORDINATED PUBLIC TRANSPORTATION West Texas/El Paso Region Regional Service Plan for Brewster, Culberson, El Paso, Hudspeth, Jeff Davis and Presidio Counties Submitted... by the West Texas/El Paso Regional Coordinated Transportation Planning Coalition Prepared by El Paso County Transit December 1, 2006 El Paso, Texas VAMONOS West Texas/El Paso Regional Service Plan 2 COORDINATED REGIONAL PUBLIC TRANSPORTATION PLAN...

  9. Integrated Transmission and Distribution Control

    SciTech Connect (OSTI)

    Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

    2013-01-16

    Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: • Develop a simulation environment for integrating transmission and distribution control, • Construct reduced-order controllable models for smart grid assets at the distribution level, • Design and validate closed-loop control strategies for distributed smart grid assets, and • Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

  10. Trends In U.S. Electric Power Transmission

    SciTech Connect (OSTI)

    NONE

    2007-11-15

    The report provides an overview of the changes that are occurring in the industry to implement the goals of improved reliability and reduced congestion costs. As the electric industry works to become a more efficient market, transmission stands as a key link between the competitive generation and the regulated distribution sectors. In this role as a key link, transmission is a major focus of government efforts to improve reliability and reduce congestion costs. The scope of the report is to analyze the dominant reliability, investment, siting, and competition/open access trends that are occurring in the domestic electric transmission industry. Topics covered include: the impact of the 2003 Northeast blackout on reliability rules; the move from voluntary to mandatory reliability standards; the advent of real-time transmission system monitoring; ISO/RTO efforts to improve system reliability; the drivers of government intervention in transmission investment; the move towards incentive-based rates for transmission investment; legislative and regulatory efforts to spur transmission investment to support renewable energy resources; the emergence of merchant transmission; the need for federal backstop authority on regional transmission projects; the designation of national interest electric transmission corridors; FERC Orders on siting transmission; the need for changes in open access and competition regulations; FERC efforts to increase open access and competition; legislative efforts to increase competition; and, current competitive issues in the industry.

  11. 2009 National Electric Transmission Congestion Study- Oklahoma City Workshop

    Office of Energy Efficiency and Renewable Energy (EERE)

    On June 18, 2008, DOE hosted a regional pre-study workshop in Oklahoma City, OK to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda,...

  12. EIS-0377: Big Stone II Power Plant and Transmission Project

    Broader source: Energy.gov [DOE]

    A systems study was carried out to identify the most appropriate locations to interconnect the proposed Big Stone II power plant to the regional utility grid. The study also identified transmission...

  13. 2009 National Electric Transmission Congestion Study- Hartford Workshop

    Broader source: Energy.gov [DOE]

    On July 9, 2008, DOE hosted a regional pre-study workshop in Hartford, CT to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full...

  14. TRANSMISSION MEDIA 4.1 Guided Transmission Media

    E-Print Network [OSTI]

    Scarano, Vittorio

    CHAPTER 4 TRANSMISSION MEDIA 4.1 Guided Transmission Media Twisted Pair Coaxial Cable Optical Fiber 4.2 Wireless Transmission Antennas Terrestrial Microwave Satellite Microwave Broadcast Radio.4 Line-of-Sight Transmission Free Space Loss Atmospheric Absorption Multipath Refraction 4.5 Recommended

  15. Renewable Generation Effect on Net Regional Energy Interchange...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    North-West Power Pool PV Photovoltaic power generation RE Renewable energy: PV andor wind RMPP Rocky Mountains Power Pool TEPPC Transmission Expansion Planning Policy Committee...

  16. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

    1991-08-27

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

  17. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

    1991-01-01

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

  18. A mechanistic approach for accurate simulation of village scale malaria transmission

    E-Print Network [OSTI]

    Duchemin, Jean-Bernard

    Background: Malaria transmission models commonly incorporate spatial environmental and climate variability for making regional predictions of disease risk. However, a mismatch of these models' typical spatial resolutions ...

  19. Transmission line capital costs

    SciTech Connect (OSTI)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

  20. Budget & Planning Strategic Plan

    E-Print Network [OSTI]

    Harms, Kyle E.

    Budget & Planning Strategic Plan Strategic Goal 1: Maintain a suitably staffed, effective the budget and planning needs of the institution. Strategic Goal 5: Identify ways in which B&P information and training opportunities to remain at the forefront of national trends Strategic Goal 2: Continue to meet

  1. Management Plan Management Plan

    E-Print Network [OSTI]

    Management Plan Management Plan "Management and restoration programs for native salmonids have communities" J. Lichatowich et al. 1998. A Conceptual Foundation for the Management of Native Salmonids in the Deschutes River. The Management Plan consists of five elements described in the Council's program: 1

  2. Autonomous data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, O.M.

    1997-03-25

    A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

  3. Autonomous data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

    1997-01-01

    A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

  4. Borehole data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, O.M.

    1993-03-23

    A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

  5. Borehole data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

    1993-01-01

    A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

  6. Abstract--Under the need for anticipatory efficient investment in transmission, several problems arise at the regulation and

    E-Print Network [OSTI]

    Catholic University of Chile (Universidad Católica de Chile)

    electricity market. Index Terms--Transmission planning, transmission investment, regulation, additional lines electric system. Without anticipatory investment, the net number of lines in the long term may1 Abstract--Under the need for anticipatory efficient investment in transmission, several problems

  7. > PAPER FOR THE SPECIAL SECTION ON TRANSMISSION INVESTMENT, PRICING AND CONSTRUCTION < 1 Abstract--From an economic perspective, the appropriate

    E-Print Network [OSTI]

    the impacts of an electricity transmission project on different players may vary, such side payments a multi-stage game-theoretic framework for electricity transmission investment as a new planning paradigm> PAPER FOR THE SPECIAL SECTION ON TRANSMISSION INVESTMENT, PRICING AND CONSTRUCTION

  8. Reinforcing Power Grid Transmission with FACTS Devices

    E-Print Network [OSTI]

    Frolov, Vladimir; Chertkov, Misha

    2013-01-01

    We explore optimization methods for planning the placement, sizing and operations of Flexible Alternating Current Transmission System (FACTS) devices installed into the grid to relieve congestion created by load growth or fluctuations of intermittent renewable generation. We limit our selection of FACTS devices to those that can be represented by modification of the inductance of the transmission lines. Our master optimization problem minimizes the $l_1$ norm of the FACTS-associated inductance correction subject to constraints enforcing that no line of the system exceeds its thermal limit. We develop off-line heuristics that reduce this non-convex optimization to a succession of Linear Programs (LP) where at each step the constraints are linearized analytically around the current operating point. The algorithm is accelerated further with a version of the cutting plane method greatly reducing the number of active constraints during the optimization, while checking feasibility of the non-active constraints post...

  9. Drill string transmission line

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

    2006-03-28

    A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

  10. Transmission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-EnhancingEt Al., 2013)OpenEnergyTrail Canyon GeothermalTransmission (Redirected from

  11. Transmission Siting_071508.indd

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsState ofSavingsTransmission SEAB Presentation

  12. Boardman to Hemingway Transmission Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open Season (NOS) PTSA Reform North American Energy...

  13. Transmission eigenvalues for elliptic operators

    E-Print Network [OSTI]

    Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

    2010-07-03

    A reduction of the transmission eigenvalue problem for multiplicative sign-definite perturbations of elliptic operators with constant coefficients to an eigenvalue problem for a non-selfadjoint compact operator is given. Sufficient conditions for the existence of transmission eigenvalues and completeness of generalized eigenstates for the transmission eigenvalue problem are derived. In the trace class case, the generic existence of transmission eigenvalues is established.

  14. University of California, San Diego Water Action Plan

    E-Print Network [OSTI]

    Gleeson, Joseph G.

    University of California, San Diego Water Action Plan December 20, 2013 #12;i Table of Contents of the Water Action Plan Water Action Plan Committee Regional Scope of the Water Action Plan HISTORICAL PROGRESS IN WATER REDUCTION.......................................................... 5 Campus Irrigation

  15. Transmission Line Circuit Alexander Glasser

    E-Print Network [OSTI]

    Anlage, Steven

    Chaos in a Transmission Line Circuit Alexander Glasser Marshal Miller With... Prof. Edward Ott Prof times become shorter, circuit connections behave more and more like transmission lines. Theoretical(t) - Transmission Line (Zo, T) #12;5 Cf/Cr 1000 Vf Capacitance Voltage Cf Cr Model for Nonlinear Capacitor

  16. New Mexico/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Western Area Power Administration, provide transmission in the state of New Mexico. Renewable Energy Transmission Authority The New Mexico Renewable Energy Transmission Authority...

  17. 2015 National Electric Transmission Congestion Study | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 National Electric Transmission Congestion Study 2015 National Electric Transmission Congestion Study 2015 National Electric Transmission Congestion Study Section 1221(a) of...

  18. Flexible Transmission in the Smart Grid

    E-Print Network [OSTI]

    Hedman, Kory Walter

    2010-01-01

    models of the electric transmission network flow problem.requirements in the electric transmission grid is provided.operations of the electric transmission grid. It also

  19. Cyclical-Transmission-Schedule Reservation Technique

    E-Print Network [OSTI]

    Garcia-Luna-Aceves, J.J.

    2010-01-01

    52) (58) (56) CYCLICAL-TRANSMISSION-SCHEDULE 6,118,787 A *for Topology Dependent Transmission Scheduling, in Proc.times an associ- ated transmission waiting time; and

  20. Flexible Transmission in the Smart Grid

    E-Print Network [OSTI]

    Hedman, Kory Walter

    2010-01-01

    differences: models for transmission property rights,” IEEEto solve power transmission network design problems,” IEEES. A. "Network topologies and transmission investment under

  1. Transmission Power Management for Wireless Health Applications

    E-Print Network [OSTI]

    Amini, Navid

    2012-01-01

    Experimental Analysis of RF Transmission Characteristics foroptimal low-energy transmission strategy for ieee 802.11a/h.Distributed algorithms for transmission power control in

  2. Device-to-Device Assisted Video Transmission

    E-Print Network [OSTI]

    Shen, Y; Zhou, W; Wu, P; Toni, L; Cosman, P C; Milstein, L B

    2013-01-01

    Equipment (UE) radio transmission and reception (3GPP TSand Mobile Ad Hoc Networks: Transmission-Capacity Tradeoff”,Device Assisted Video Transmission Yichao Shen, Wenwen Zhou,

  3. Electricity Transmission, A Primer | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electricity Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the...

  4. Inverse design of periodic metallic slits for extraordinary optical transmission

    E-Print Network [OSTI]

    Deng, Yongbo; Liu, Zhenyu; Wu, Yihui

    2016-01-01

    The inverse design methodology of periodic metallic slits for extraordinary optical transmission is presented based on the topology optimization method. Several topological configurations of periodic metallic slits with typical subwavelength size are derived with transmission peaks at the prescribed incident wavelengths in the visible light region, where the transmissivity is enhanced by effective excitation of surface-plasmon-polariton at the inlet side of the slit, Fabry-P\\'erot resonance of surface-plasmon-polariton inside the slit and radiation of the electromagnetic energy at the outlet side of the slit. The transmission peaks of the derived metallic configurations are raised along with the red shift of the incident wavelength, because of the reduction of the energy absorption and increase of the propagation distance of surface-plasmon-polariton. And the shift of transmission peak is controlled by prescribing a different incident wavelength in the corresponding topology optimization problem. To reduce th...

  5. Transmission Infrastructure Program

    Office of Environmental Management (EM)

    Electric District 5 to Palo Verde Hub 191M Construction & Term Loan Facility Major capex project by Desert South Region of Western to upgrade material segments and expand...

  6. The State of City Planning Today and It's Relation to City Planning [Reflections

    E-Print Network [OSTI]

    Jacobs, Allan B

    2006-01-01

    such programs, and physical planning would be a hit-or-missof City and Regional Planning at the University ofQuality at U.S. Graduate Planning Schools: A National

  7. Automated manual transmission clutch controller

    DOE Patents [OSTI]

    Lawrie, Robert E. (9375 Kearney Rd., Whitmore Lake, MI 48189); Reed, Jr., Richard G. (3003 Bembridge, Royal Oak, MI 48073); Rausen, David J. (519 S. Gaylord St., Denver, CO 80209)

    1999-11-30

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  8. Narrow-band optical transmission of metallic nanoslit arrays

    SciTech Connect (OSTI)

    Sun Zhijun; Yang Ying; Zuo Xiaoliu

    2012-10-22

    Metallic nanoslit arrays usually demonstrate wide transmission bands for transverse-magnetic-polarized incidence light. Here, we show that by introducing multi-dielectric layers underneath the metallic structure layer on the substrate, a narrow peak is formed, whose bandwidth can be down to a few nanometers. Three types of resonance modes in the region under the metal layer are identified responsible for the formation of the peak, i.e., a two-dimensional cavity resonance mode, which supports optical transmission, and two in-plane hybrid surface plasmon resonance modes locating on both sides of the peak that suppresses the transmission. Such structures can be applied in advanced photonic devices.

  9. Heat transmission in Relativity

    E-Print Network [OSTI]

    A. Brotas; J. C. Fernandes

    2003-07-16

    The simultaneous study of deformation and heat transmission in a bar was ignored for about 150 years. The traditional Fourier equation just allows to study the evolution of temperature in a undeformable bar. The search for its relativistic variant is a task which must fail because in Relativity there are no undeformable bars. Rigid bodies, in the sense as rigid as possible, are deformables. In this work we show how to write in Relativity the system of equations necessary to study simultaneously deformation and temperature evolution along a rigid bar.

  10. Transmission SEAB Presentation

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE- Non-ResidentialAlliantPGEDepartmentfan system' % ~ TransmissionAvailable

  11. DOE Transmission Workshop

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i pStateDOE FederalTheofHeyeck, AEP, Sr. Vice President, Transmission

  12. Transmission Business Line

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking With U.S.Week DayDr.Theories81TowardsTrackingCarbon2Transmission

  13. Light Transmission through Sub-Wavelength Apertures

    E-Print Network [OSTI]

    Visser, Taco D.

    Light Transmission through Sub-Wavelength Apertures #12;#12;VRIJE UNIVERSITEIT Light Transmission Transmission through a Single Sub-wavelength Slit 59 3.1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60 3.2 The configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61 3.3 Transmission

  14. EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona

    Broader source: Energy.gov [DOE]

    Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis–Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service.

  15. 2012 National Electric Transmission Congestion Study: Presentation...

    Energy Savers [EERE]

    2012 National Electric Transmission Congestion Study: Presentation from Congestion Study Webinar Series 2012 National Electric Transmission Congestion Study: Presentation from...

  16. 2009 National Electric Transmission Congestion Study Workshops...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Congestion Studies 2009 Congestion Study 2009 National Electric Transmission Congestion Study Workshops 2009 National Electric Transmission Congestion Study Workshops DOE...

  17. Transmission Eigenvalues in Inverse Scattering Theory

    E-Print Network [OSTI]

    2012-04-22

    TE and Scattering Theory. Spherically Stratified Media. Transmission Eigenvalues. Open Problem. Transmission Eigenvalues in Inverse. Scattering Theory.

  18. Transmission Reliability Program 2015 Reliability & Markets Peer...

    Office of Environmental Management (EM)

    Transmission Reliability Program 2015 Reliability & Markets Peer Review Materials Available Transmission Reliability Program 2015 Reliability & Markets Peer Review Materials...

  19. Clean Energy Business Plan Competition

    ScienceCinema (OSTI)

    Maxted, Sara Jane; Lojewski, Brandon; Scherson, Yaniv;

    2013-05-29

    Top Students Pitch Clean Energy Business Plans The six regional finalists of the National Clean Energy Business Plan Competition pitched their business plans to a panel of judges June 13 in Washington, D.C. The expert judges announced NuMat Technologies from Northwestern University as the grand prize winner.

  20. Clean Energy Business Plan Competition

    SciTech Connect (OSTI)

    Maxted, Sara Jane; Lojewski, Brandon; Scherson, Yaniv;

    2012-01-01

    Top Students Pitch Clean Energy Business Plans The six regional finalists of the National Clean Energy Business Plan Competition pitched their business plans to a panel of judges June 13 in Washington, D.C. The expert judges announced NuMat Technologies from Northwestern University as the grand prize winner.

  1. Manual transmission shift linkage

    SciTech Connect (OSTI)

    Sewell, J.S.

    1991-10-01

    This patent describes a sliding gear manual transmission (10) for an automotive vehicle including a transmission housing (11), an input shaft (12) journalled in the housing, an output shaft (13) axially aligned with the input shaft and journalled in the housing, a countershaft (15) journalled in the housing and carrying a cluster gear (17) thereon, the input shaft (12) terminating in an input gear (14), a plurality of gears (26,27,28,29,31,31) on the output shaft (13) in meshing engagement with the cluster gear (17), and a plurality of synchronizing clutches (36,38,41,42) on the output shaft and countershaft for engagement of gear ratios of the meshing gears, and an axially movable and rotatable shift rail (81) located in the housing and operatively connected to a shift lever (82) actuated by the vehicle operator, the improvement comprising an auxiliary shift rail (98) located in the housing (11) generally paralleling the first mentioned shift rail (81) to provide for actuation of fifth, sixth and reverse gears the auxiliary shift rail (98) having a 5-6 shift arm (104) journalled thereon for axial movement relative thereto, and a reverse shift arm (99) rotatably mounted thereon for axial movement therewith.

  2. Colorado Electrical Transmission Grid

    SciTech Connect (OSTI)

    Zehner, Richard E.

    2012-02-01

    Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Originator: Xcel Energy Publication Date: 2012 Title: Colorado XcelEnergy NonXcel Transmission Network Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains transmission network of Colorado Spatial Domain: Extent: Top: 4540689.017558 m Left: 160606.141934 m Right: 758715.946645 m Bottom: 4098910.893397m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shapefile

  3. Microsoft PowerPoint - Carlsen.ppt

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    submitted Economic Studies Southeastern Regional Transmission Planning Process Load Forecast External Models Transmission Expansion Plan Generation Resources & Demand Side...

  4. Dynamic Transmission Electron Microscopy

    SciTech Connect (OSTI)

    Evans, James E.; Jungjohann, K. L.; Browning, Nigel D.

    2012-10-12

    Dynamic transmission electron microscopy (DTEM) combines the benefits of high spatial resolution electron microscopy with the high temporal resolution of ultrafast lasers. The incorporation of these two components into a single instrument provides a perfect platform for in situ observations of material processes. However, previous DTEM applications have focused on observing structural changes occurring in samples exposed to high vacuum. Therefore, in order to expand the pump-probe experimental regime to more natural environmental conditions, in situ gas and liquid chambers must be coupled with Dynamic TEM. This chapter describes the current and future applications of in situ liquid DTEM to permit time-resolved atomic scale observations in an aqueous environment, Although this chapter focuses mostly on in situ liquid imaging, the same research potential exists for in situ gas experiments and the successful integration of these techniques promises new insights for understanding nanoparticle, catalyst and biological protein dynamics with unprecedented spatiotemporal resolution.

  5. AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION

    Office of Energy Efficiency and Renewable Energy (EERE)

    The agenda for the Quadrennial Energy Review (QER) public stakeholder meeting in New Orleans on petroleum product transmission, distribution, and storage.

  6. Vice President, Transmission System Operations

    Broader source: Energy.gov [DOE]

    The VP for Transmission System Operations provides strategic leadership, direction, and oversight of the people, business processes, and systems that are responsible for the safe, reliable, and...

  7. Helicopter aids transmission pole replacement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Helicopter-aids-transmission-pole-replacement Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects...

  8. Transmission Workshop | Department of Energy

    Energy Savers [EERE]

    which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions...

  9. The interior transmission problem and bounds on transmission eigenvalues

    E-Print Network [OSTI]

    Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

    2010-09-28

    We study the interior transmission eigenvalue problem for sign-definite multiplicative perturbations of the Laplacian in a bounded domain. We show that all but finitely many complex transmission eigenvalues are confined to a parabolic neighborhood of the positive real axis.

  10. Task Plans

    Office of Environmental Management (EM)

    Task Plans This page contains links to a tentative listing of active and closed TEC Task Plans. Final status of these task plans will be determined after the July 2000 TEC meeting....

  11. Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions

    Broader source: Energy.gov [DOE]

    Historically, manual transmissions have delivered better fuel economy than automatic transmissions. However, improvements in the efficiency of automatic transmissions have closed that gap in recent...

  12. HVDC power transmission technology assessment

    SciTech Connect (OSTI)

    Hauth, R.L.; Tatro, P.J.; Railing, B.D.; Johnson, B.K.; Stewart, J.R.; Fink, J.L.

    1997-04-01

    The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

  13. Wireless Video Transmission with Over-the-Air Packet Mixing

    E-Print Network [OSTI]

    Argyriou, Antonios

    2012-01-01

    In this paper, we propose a system for wireless video transmission with a wireless physical layer (PHY) that supports cooperative forwarding of interfered/superimposed packets. Our system model considers multiple and independent unicast transmissions between network nodes while a number of them serve as relays of the interfered/superimposed signals. For this new PHY the average transmission rate that each node can achieve is estimated first. Next, we formulate a utility optimization framework for the video transmission problem and we show that it can be simplified due to the features of the new PHY. Simulation results reveal the system operating regions for which superimposing wireless packets is a better choice than a typical cooperative PHY.

  14. EC Transmission Line Materials

    SciTech Connect (OSTI)

    Bigelow, Tim S

    2012-05-01

    The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

  15. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric...

    Broader source: Energy.gov (indexed) [DOE]

    demonstration, technology transfer, and policy development activities for the electric transmission and distribution system. OE has prepared this program plan pursuant...

  16. Analysis of soft x-ray/VUV transmission characteristics of Si and Al filters

    SciTech Connect (OSTI)

    Joseph, Aby; Modi, Mohammed H.; Singh, Amol; Gupta, R. K.; Lodha, G. S.

    2013-02-05

    Ultrathin filters of Al (1500A) and Si (1200A) should exhibit more than 65% transmission above their Labsorption edges in the soft x-ray/vacuum ultra violet region(Si L-edge: 124 A and Al L-edge: 170 A). However, the measured transmission characteristics of these filters showed {approx}40% transmission. The transmission measurements of these filters were carried at the reflectivity beamline of Indus-1 synchrotron source out over a large wavelength range of 120-360A. In order to understand the measured transmission performance a detailed model fitting is performed using the Paratt formalism. It is found that the oxidation of the surface region of the filters is responsible for the reduced transmission performance. Effects of higher harmonics of the toroidal grating monochromator are also considered in the data analysis.

  17. Three-dimensional infrared metamaterial with asymmetric transmission

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Kenanakis, George; Xomalis, Aggelos; Selimis, Alexandros; Vamvakaki, Maria; Farsari, Maria; Kafesaki, Maria; Soukoulis, Costas M.; Economou, Eleftherios N.

    2015-01-14

    A novel three-dimensional (3D) metallic metamaterial structure with asymmetric transmission for linear polarization is demonstrated in the infrared spectral region. The structure was fabricated by direct laser writing and selective electroless silver coating, a straightforward, novel technique producing mechanically and chemically stable 3D photonic structures. The structure unit cell is composed of a pair of conductively coupled magnetic resonators, and the asymmetric transmission response results from interplay of electric and magnetic responses; this equips the structure with almost total opaqueness along one propagation direction versus satisfying transparency along the opposite one. It also offers easily adjustable impedance, 90° one-way puremore »optical activity and backward propagation possibility, resulting thus in unique capabilities in polarization control and isolation applications. We show also that scaling down the structure can make it capable of exhibiting its asymmetric transmission and its polarization capabilities in the optical region.« less

  18. RAPID/BulkTransmission/Transmission Siting & Interconnection | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsourceBulkTransmission/Environment/Nevada < RAPID‎RAPID/BulkTransmission/Site Considerations <

  19. Two-particle quantum transmission

    E-Print Network [OSTI]

    Ron Folman

    2012-11-25

    Two-photon interference is a fundamental phenomenon in quantum mechanics and stands at the base of numerous experimental observations. Here another manifestation of this phenomenon is described, taking place at a Y junction. Specifically it is shown how the r^2+t^2 term which is behind previous observations of two-photon interference, may give rise to different states at a beam-splitter and different two-particle transmission coefficients at a Y junction. Different from previous descriptions of quantum transmission based on one-particle physics, the enhanced transmission described here is due to two-particle physics.

  20. Electrical transmission line diametrical retainer

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

    2004-12-14

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

  1. Hedge cities : gambling on regional futures

    E-Print Network [OSTI]

    Shorett, Mark, 1976-

    2004-01-01

    Environmental degradation, automobile dependence, anticipated rapid population growth and spatial inequity have combined to form the basis for recent North American regional plans advocating a physical alternative to ...

  2. Transmission eigenvalue distributions in highly conductive molecular junctions

    E-Print Network [OSTI]

    Bergfield, Justin P; Barr, Joshua D; Stafford, Charles A

    2012-01-01

    Transmission eigenvalue distributions in highly conductivesingle-molecule junction; transmission eigenchannels Openuniquely characterized by its transmission eigenvalues ? n .

  3. Incorporating Energy Efficiency into Western Interconnection Transmission Planning

    E-Print Network [OSTI]

    Barbose, Galen

    2014-01-01

    Association. 2010. Improving Energy Efficiency for Alberta’sStudy. Nexant. 2010. NorthWestern Energy Assessmentof Energy Efficiency Potentials (2010-2029). Quantec. 2007.

  4. Incorporating Energy Efficiency into Western Interconnection Transmission Planning

    E-Print Network [OSTI]

    Barbose, Galen

    2014-01-01

    2010. Improving Energy Efficiency for Alberta’s IndustrialEnergy Assessment of Energy Efficiency Potentials (2010-2010. Improving Energy Efficiency for Alberta’s Industrial

  5. Incorporating Energy Efficiency into Western Interconnection Transmission Planning

    E-Print Network [OSTI]

    Barbose, Galen

    2014-01-01

    types of DSM resources: energy efficiency, demand response (with New Mexico’s energy efficiency resource standard. Theand Texas' energy efficiency resource standards. From 2022

  6. Microsoft Word - Impact_DSR_on_Transmission_Planning_Final.docx

    Energy Savers [EERE]

    CO2R RPSN BAU EEDR CO2N CO2R RPSN BAU EEDR CO2N CO2R RPSN Southwest Southeast Midwest Central Northeast Genertion (TWh) Low Demand Base Demand High Demand 15 In the...

  7. Incorporating Demand Response into Western Interconnection Transmission Planning

    E-Print Network [OSTI]

    Satchwell, Andrew

    2014-01-01

    Aggregator Programs. Demand Response Measurement andIncorporating Demand Response into Western Interconnection13 Demand Response Dispatch

  8. Incorporating Energy Efficiency into Western Interconnection Transmission Planning

    E-Print Network [OSTI]

    Barbose, Galen

    2014-01-01

    Incorporating Demand Response into Western Interconnectiongeneration DR – demand response DSM – demand-side managementenergy efficiency, demand response (DR), and distributed

  9. Interstate Strategies for Transmission Planning and Expansion | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QAsource History View NewTexas: Energy ResourcesOrder at 8, 13Renewable Power

  10. Federal Register Notice: Plan for Conduct of 2012 Electric Transmission

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLforLDRD Report to Congress MoreHydlogo_femp.pngAddthis853Energy

  11. Interconnection-Wide Transmission Planning Initiative - Meeting Calendars |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLforLDRDEnergy Copyrights ASite ForResearch,The documentsCoP)List

  12. Plan to Conduct Electric Transmission Congestion Study: Federal Register

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy AEnergyPresidential PermitDAYS - WE NEED ADr. PeterPV),

  13. BPA selects new VP of Transmission Planning and Asset Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory of raregovAboutRecovery ActTools to someoneAstrophysicsAwardsBESResearch

  14. DOE Action Plan Addressing the Electricity Transmission System

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i p aDepartmentEnergyEveryCustomerD=DISCLAIMER:1904-AC23,T A *Chapter

  15. Transmission Planning: Institutional Issues in the West | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsState ofSavings forTitleJulyAmyDepartmentEnergy'

  16. Impacts of Demand-Side Resources on Electric Transmission Planning |

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservation Standards andEnergy Illinois StateEnergyDepartment

  17. Interconnection-Wide Transmission Planning Initiative: Topic A,

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservationEnergy5975-01TransactionsDepartmentServices

  18. Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservationEnergy5975-01TransactionsDepartmentServicesAmong States

  19. Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservationEnergy5975-01TransactionsDepartmentServicesAmong

  20. Interconnection-Wide Transmission Planning Initiative: Topic B, State

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservationEnergy5975-01TransactionsDepartmentServicesAmongAgency

  1. Recovery Act Interconnection Transmission Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report Appendices |ProjectKnow Your

  2. Transmission Services Product Pricing Validation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and 09:00 PPT on the above effective date. On October 15, 2013, at 08:00 (PPT), Transmission Services will be updating the OASIS default product prices to reflect the 2014...

  3. Transmission Services Product Pricing Validation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and 12:00 PPT on the above effective date. On October 1, 2015, at 11:00 (PPT), Transmission Services will be updating the OASIS default product prices to reflect the 2016...

  4. TRANSMISSION AND GENERATION INVESTMENT IN ...

    E-Print Network [OSTI]

    2015-03-04

    Mar 4, 2015 ... generation capacity by private firms in liberalized electricity markets. ... Electricity Markets, Network Expansion, Transmission Management. 1 ...... renewables: Using two-stage optimisation to evaluate flexibility and the cost of.

  5. Immunology of naturally transmissible tumours

    E-Print Network [OSTI]

    Siddle, Hannah V.; Kaufman, Jim

    2014-09-04

    understanding of the vertebrate immune response to allografts. Two naturally occurring contagious cancers are currently active in the animal kingdom, Canine Transmissible Venereal Tumour (CTVT) that spreads among dogs and Devil Facial Tumour Disease (DFTD) among...

  6. CDKN-CARICOM-A Regional Implementation Plan for CARICOM's Regional

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LISTStar Energy LLC JumpBiossenceBrunswick, Maine:IAEAT Jump to:CBD Energy

  7. 2009 National Electric Transmission Congestion Study | Department...

    Energy Savers [EERE]

    Congestion Studies 2009 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended...

  8. 2006 National Electric Transmission Congestion Study Federal...

    Office of Environmental Management (EM)

    6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

  9. 2006 National Electric Transmission Congestion Study | Department...

    Office of Environmental Management (EM)

    6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

  10. Exploring the Business Link Opportunity: Transmission & Clean...

    Office of Environmental Management (EM)

    Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the...

  11. Transmission Line MTF: Magnetized Target Fusion

    E-Print Network [OSTI]

    Transmission Line MTF: Magnetized Target Fusion Initial target: preheated & magnetized Subsequent for the FRC. Abstract Block Diagram theta coil transmission line Bias cap. bank maincapacitor inductor PI cap

  12. Transmission Reassignment Reporting Requirement - April 2, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Transmission Reassignment Reporting Requirement This notice serves as a reminder to transmission...

  13. Transmission/Nepa Database | Open Energy Information

    Open Energy Info (EERE)

    Nepa Database < Transmission Jump to: navigation, search NepaHeader.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New...

  14. Transmission Eigenvalues in Inverse Scattering Theory

    E-Print Network [OSTI]

    Title: Transmission Eigenvalues in Inverse Scattering Theory Abstract: The transmission eigenvalue problem is a new class of eigenvalue problems that has

  15. WEYL ASYMPTOTICS OF THE TRANSMISSION EIGENVALUES ...

    E-Print Network [OSTI]

    2014-09-02

    plex internal transmission eigenvalues when the domain is a ball and the index ... formulas for the counting function of the real Interior Transmission Eigenvalues.

  16. A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS

    E-Print Network [OSTI]

    Mills, Andrew; Wiser, Ryan; Porter, Kevin

    2007-01-01

    Solar Capacity Factor Capacity Energy TC = c c ( P w + P c +cost weighted by energy or capacity has far less importancerelative share of capacity and energy from the modeled wind

  17. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    Wind Energy Project. New England Electricity Scenario Analysis: Exploring the economic, reliability, and environmental impacts

  18. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    to Support the Development of Wind Powered Generation inExtraeuropean Options for an Energy Supply with Wind Power,”Conference on Wind Power for the 21 st Century, Kassel,

  19. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    pdf/0554(2008).pdf European Wind Energy Association (EWEA).Large Scale Integration of Wind Energy in the European PowerPrepared by the European Wind Energy Association. http://

  20. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    line cost and substation costs. The resulting broad range inthe cost of all associated equipment such as substations,

  1. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01

    Assumptions to the Annual Energy Outlook 2008. Washington,to produce the EIA’s Annual Energy Outlook. As shown in theby the EIA in its Annual Energy Outlook (AEO), as well as to

  2. REGIONAL PLANNING IN RIO DE JANEIRO, BRAZIL Urban Planning Studio

    E-Print Network [OSTI]

    experienced renewed interest after the partially state-owned oil corporation Petrobras announced of investment and scale of activities. Petrobras expects Comperj to generate over 200

  3. NV PFA Regional Data

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    James Faulds

    2015-10-28

    This project focused on defining geothermal play fairways and development of a detailed geothermal potential map of a large transect across the Great Basin region (96,000 km2), with the primary objective of facilitating discovery of commercial-grade, blind geothermal fields (i.e. systems with no surface hot springs or fumaroles) and thereby accelerating geothermal development in this promising region. Data included in this submission consists of: structural settings (target areas, recency of faulting, slip and dilation potential, slip rates, quality), regional-scale strain rates, earthquake density and magnitude, gravity data, temperature at 3 km depth, permeability models, favorability models, degree of exploration and exploration opportunities, data from springs and wells, transmission lines and wilderness areas, and published maps and theses for the Nevada Play Fairway area.

  4. East Texas Regional Transportation Coordination Plan 

    E-Print Network [OSTI]

    East Texas Council of Governments

    2006-01-01

    Renewable energy technologies have been growing in their installed capacity rapidly over the past few years. This growth in solar, wind and other technologies is fueled by state incentives, renewable energy mandates, ...

  5. Thurston Regional Planning Council Helps Washingtonians Save...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    rising fuel costs, and the increase in childhood obesity); and reduce greenhouse gases, carbon footprint, and vehicle miles traveled. The Weatherization and Intergovernmental...

  6. Alamo Area Regional Public Transportation Coordination Plan 

    E-Print Network [OSTI]

    Alamo Area Council of Governments

    2006-11-30

    potentially require transit services to meet mobility needs. Weir Kyle Hays Buda Poth Manor Hutto Selma Zuehl Runge Nixon Kirby Moore Lytle Hondo Mason Llano Luling Burnet Uhland Seguin Marion Cibolo Blanco Tuleta Smiley Pettus Pawnee Kenedy Poteet Devine... Springs Dripping Springs Chula Vista-River Spur San Antonio Austin Frio Kerr Bexar Medina Travis Uvalde Hays Atascosa Llano Zavala Bee Gillespie Wilson Kimble Karnes Mason Blanco Real Bandera Comal Kendall La Salle Burnet Dimmit Guadalupe Williamson Mc...

  7. State of Alaska Regional Energy Planning

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLE DIRECTIVESDepartmentSpecialCode ofDepartment of ofEnergyout

  8. Grid Expansion Planning for Carbon Emissions Reduction

    SciTech Connect (OSTI)

    Bent, Russell W. [Los Alamos National Laboratory; Toole, Gasper L. [Los Alamos National Laboratory

    2012-07-18

    There is a need to upgrade and expand electric power transmission and generation to meet specified renewable energy targets and simultaneously minimize construction cost and carbon emissions. Some challenges are: (1) Renewable energy sources have variable production capacity; (2) Deficiency of transmission capacity at desirable renewable generation locations; (3) Need to incorporate models of operations into planning studies; and (4) Prevent undesirable operational outcomes such as negative dispatch prices or curtailment of carbon neutral generation.

  9. Y-12 Site Sustainability Plan

    SciTech Connect (OSTI)

    none,; Erhart, S C; Spencer, C G

    2013-12-01

    This plan addresses: Greenhouse Gas Reduction and Comprehensive Greenhouse Gas Inventory; Buildings, ESPC Initiative Schedule, and Regional and Local Planning; Fleet Management; Water Use Efficiency and Management; Pollution Prevention and Waste Reduction; Sustainable Acquisition; Electronic Stewardship and Data Centers; Renewable Energy; Climate Change; and Budget and Funding.

  10. Proactive Planning 

    E-Print Network [OSTI]

    Wythe, Kathy

    2008-01-01

    an opportunity to voice their opinions and help draft the watershed protection plan for the reservoir. The plan, which will outline ways to reduce pollution and improve water quality, is an outgrowth of years of water quality monitoring and research by TRWD... in stakeholder-based watershed protection planning focused on holistic solutions to water pollution by exam- ining the impacts of upstream activities. Watershed-based planning is a relatively new approach to pollution reduction in all sizes of water bodies...

  11. TRANSMISSION EIGENVALUES LASSI PAIVARINTA AND JOHN SYLVESTER

    E-Print Network [OSTI]

    Sylvester, John

    TRANSMISSION EIGENVALUES LASSI P¨AIV¨ARINTA AND JOHN SYLVESTER Abstract. The scattering of a time. A transmission eigenvalue is a wavenumber at which the scattering operator has a non-trivial kernel or cokernel that are not transmission eigenvalues, they have been studied for some time. Nevertheless, the existence of transmission

  12. Prudent behaviour accelerates disease transmission

    E-Print Network [OSTI]

    Scarpino, Samuel V; Hebert-Dufresne, Laurent

    2015-01-01

    Infectious diseases often spread faster near their peak than would be predicted given early data on transmission. Despite the commonality of this phenomena, there are no known general mechanisms able to cause an exponentially spreading dis- ease to begin spreading faster. Indeed most features of real world social networks, e.g. clustering1,2 and community structure3, and of human behaviour, e.g. social distancing4 and increased hygiene5, will slow disease spread. Here, we consider a model where individuals with essential societal roles-e.g. teachers, first responders, health-care workers, etc.- who fall ill are replaced with healthy individuals. We refer to this process as relational exchange. Relational exchange is also a behavioural process, but one whose effect on disease transmission is less obvious. By incorporating this behaviour into a dynamic network model, we demonstrate that replacing individuals can accelerate disease transmission. Furthermore, we find that the effects of this process are trivial w...

  13. National Electric Transmission Congestion Study

    Office of Environmental Management (EM)

    DOE U.S. Department of Energy DSIRE Database of State Incentives for Renewables & Efficiency EIA Energy Information Administration EISPC Eastern Interconnection States Planning...

  14. The role of transmission investment in the coordination between generation and transmission

    E-Print Network [OSTI]

    Boyer, Edmond

    1 The role of transmission investment in the coordination between generation and transmission Abstract This paper examines how transmission coordinates with generation to the long term in a liberalized generation and transmission of electricity into distinct modules. The governance structure of transmission

  15. Power superconducting power transmission cable

    DOE Patents [OSTI]

    Ashworth, Stephen P. (Cambridge, GB)

    2003-01-01

    The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

  16. SYSTEMS BIOLOGY Accurate information transmission

    E-Print Network [OSTI]

    Tsimring, Lev S.

    SYSTEMS BIOLOGY Accurate information transmission through dynamic biochemical signaling networks) and variability in cellular states (extrinsic noise) degrade information transmitted through signaling networks-induced information loss. In the extracellular signal­regulated kinase (ERK), calcium (Ca2+ ), and nuclear factor

  17. "FLIGHT PLAN" FORECASTS SEATTLE/TACOMA AND

    E-Print Network [OSTI]

    ASSESSMENT OF THE "FLIGHT PLAN" FORECASTS FOR SEATTLE/TACOMA AND REGIONAL AIRPORTS TOGETHER 1. Introduction 5 2. Airport Planning Process 7 Traditional Master Planning Application to Seattle/Tacoma. Uncertainty about Capacity 27 A Fuzzy Concept Assessment Factors Application to Seattle/Tacoma 7. Assessment

  18. Water for Texas 2012: What is the plan

    E-Print Network [OSTI]

    2011-01-01

    ?s Executive Summary. ?is plan is based on the ?drought of record,? which occurred in the ????s. Planning starts at the regional level with ?? regional water planning groups identifying water needs and recommending water management strategies... needs are projected to increase by ??? percent between ???? and ???? to ?.? million acre-feet per year. What can we do to get more water? ?e strategies recommended by regional water planning groups would provide, if implemented, ?.? million acre...

  19. Electric and magnetic field reduction by alternative transmission line options

    SciTech Connect (OSTI)

    Stewart, J.R. (Power Technologies, Inc., Schenectady, NY (United States)); Dale, S.J. (Oak Ridge National Lab., TN (United States)); Klein, K.W. (Energetics, Inc., Columbia, MD (United States))

    1991-01-01

    Ground level electric, and more recently magnetic, fields from overhead power transmission lines are increasingly important considerations in right of way specification, with states setting or planning to set edge of right of way limits. Research has been conducted in high phase order power transmission wherein six of twelve phases are used to transmit power in less physical space and with reduced electrical environmental effects than conventional designs. The first magnetic field testing, as reported in this paper, has verified predictive methods for determination of magnetic fields from high phase order lines. Based on these analytical methods, field profiles have been determined for lines of different phase order of comparable power capacity. Potential advantages of high phase order as a means of field mitigation are discussed. 10 refs., 12 figs., 3 tabs.

  20. Coordination of Transmission Line Transfer Capabilities

    E-Print Network [OSTI]

    Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Industry Representative Richard Goddard Portland General Electric Research Team Students Yuan Li Yonghong

  1. Wireless power transmission for medical applications

    E-Print Network [OSTI]

    Payne, Joshua E.

    We studied the wireless power transmission capabilities of microwave through human skin-tissue. Microwave transmission through simulated human skins was tested with rectenna array as a power receiver located under the ...

  2. Transmission

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaicsState ofSavings forTitleJulyAmyDepartment ofMelissa~

  3. Energy Organizational Planning

    SciTech Connect (OSTI)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty – control and manage their natural resource assets – i.e. develop its own energy resources, meet the current and projected energy needs of their community, and “sit at the table” with other regional energy providers to deal with issues on a peer-to-peer basis.

  4. Midwest Transmission Workshop II Summary

    SciTech Connect (OSTI)

    Kevin Bryan

    2002-12-05

    OAK-B135 After introductions of all participants, Abby Arnold, RESOLVE, reviewed the purpose of the meeting and the agenda. The purpose of the workshop was to share the results of the Midwest Independent System Operator (MISO) scenario development for wind and other fuel sources and the corresponding implications for transmission throughout the MISO control area. The workshop agenda is included in Attachment A.

  5. Analytic bounds on transmission probabilities

    E-Print Network [OSTI]

    Boonserm, Petarpa

    2009-01-01

    We develop some new analytic bounds on transmission probabilities (and the related reflection probabilities and Bogoliubov coefficients) for generic one-dimensional scattering problems. To do so we rewrite the Schrodinger equation for some complicated potential whose properties we are trying to investigate in terms of some simpler potential whose properties are assumed known, plus a (possibly large) "shift" in the potential. Doing so permits us to extract considerable useful information without having to exactly solve the full scattering problem.

  6. Energy Transmission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015 Infographic courtesyEducationNevadaSessionToo! |October 4,Transmission

  7. Average transmission probability of a random stack

    E-Print Network [OSTI]

    Yin Lu; Christian Miniatura; Berthold-Georg Englert

    2009-07-31

    The transmission through a stack of identical slabs that are separated by gaps with random widths is usually treated by calculating the average of the logarithm of the transmission probability. We show how to calculate the average of the transmission probability itself with the aid of a recurrence relation and derive analytical upper and lower bounds. The upper bound, when used as an approximation for the transmission probability, is unreasonably good and we conjecture that it is asymptotically exact.

  8. Transmission and Generation Investment in Electricity Markets

    E-Print Network [OSTI]

    Mar 4, 2015 ... Transmission and Generation Investment in Electricity Markets: The Effects of Market Splitting and Network Fee Regimes.

  9. Washington/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Avista, Pacificorp, Puget Sound Energy, Tacoma Public Utilities, Bonneville Power Administration, Columbia Grid, Northern Tier Transmission Group, and Seattle City...

  10. Coiled transmission line pulse generators

    DOE Patents [OSTI]

    McDonald, Kenneth Fox (Columbia, MO)

    2010-11-09

    Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

  11. BPA, Electric Transmission Overview, October 2012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Electric Transmission Overview Electric transmission Electric transmission is the process by which large amounts of...

  12. July 2, 2007 1 Optimal Transmission Switching

    E-Print Network [OSTI]

    Mangasarian, Olvi L.

    . INTRODUCTION n large electric networks, transmission is traditionally characterized as a static systemJuly 2, 2007 1 Optimal Transmission Switching Emily Bartholomew Fisher, Student Member, IEEE an optimal generation dispatch and transmission topology to meet a specific inflexible load as a mixed

  13. Smart Grid Application of Optimal Transmission Switching

    E-Print Network [OSTI]

    Ferris, Michael C.

    ;6 Introduction continued Electric Transmission Network Flow Problem Optimal Power Flow (OPF) AlternatingSmart Grid Application of Optimal Transmission Switching By, Kory W. Hedman, et al.* University (Professor, UC Berkeley) #12;2 Motivation Co-optimize transmission topology and generation dispatch

  14. Chopper Modulation Improves OTA Information Transmission

    E-Print Network [OSTI]

    Maryland at College Park, University of

    Chopper Modulation Improves OTA Information Transmission Nicole M Nelson and Pamela A Abshire 20742 Email: {nmnelson,pabshire}@umd.edu Abstract-- We have investigated information transmission- ing the channel capacity for transmission of analog signals through an OTA using an information

  15. Transmission eigenvalues for degenerate and singular cases

    E-Print Network [OSTI]

    Sylvester, John

    Transmission eigenvalues for degenerate and singular cases Valery Serov and John Sylvester Abstract We prove the existence of infinitely many real interior transmission eigenvalues for positive transmission eigenvalues. We will prove that positive values of the square of the wavenumber k2 for which

  16. Social transmission of face preferences among humans

    E-Print Network [OSTI]

    Indiana University

    Social transmission of face preferences among humans Benedict C. Jones1,*, Lisa M. DeBruine1 researchers to propose that social transmission of mate preferences may influence sexual selection for male traits. Although it has been suggested that social transmission may also influence mate preferences

  17. Transmission Eigenvalues in One Dimension John Sylvester

    E-Print Network [OSTI]

    Sylvester, John

    Transmission Eigenvalues in One Dimension John Sylvester Abstract We show how to locate all the transmission eigenvalues for a one dimensional constant index of refraction on an interval. 1 Introduction #12;Whenever such a nontrivial pair exists, we say that k2 is an interior transmission eigenvalue

  18. Transmission consequences of coinfection: cytokines writ large?

    E-Print Network [OSTI]

    Transmission consequences of coinfection: cytokines writ large? Andrea L. Graham1 , Isabella M between- host transmission. Cytokines, immune signalling mol- ecules with a fundamental role-host transmission represents a major challenge in parasite ecology and applied biomedicine [1­5]. Co- infection (see

  19. Haykin Chapter 4 Baseband Pulse Transmission

    E-Print Network [OSTI]

    Al-Ghadhban, Samir

    1/30/2014 1 Haykin Chapter 4 Baseband Pulse Transmission EE571 Dr. Samir Alghadhban KFUPM 1 · In this chapter we study the transmission of digital data (of whatever origin) over a baseband channel. · Baseband transmission of digital data requires the use of a lowpass channel with a bandwidth large enough

  20. A Distributed System for Cooperative MIMO Transmissions

    E-Print Network [OSTI]

    Kalyanaraman, Shivkumar

    a distributed system for facilitating cooperative MIMO transmissions in networks without multiple antenna diversity can be leveraged at the network, link or physical layers to provide energy efficient transmissions for reliable low-power transmissions. The rest of this paper is organized as follows: the proposed system

  1. Comments of New England Electric Transmission Corporation on...

    Office of Environmental Management (EM)

    out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and...

  2. Idaho/Transmission/State Regulations | Open Energy Information

    Open Energy Info (EERE)

    direct authority to site high-voltage transmission lines is limited to transmission lines located within National Interstate Electric Transmission Corridors (NIETC); however,...

  3. Electricity transmission congestion costs: A review of recent reports

    E-Print Network [OSTI]

    Lesieutre, Bernard C.; Eto, Joseph H.

    2003-01-01

    Commission). 2001. Electric Transmission Constraint Study.by the Office of Electric Transmission and Distribution ofCommission (FERC), Electric Transmission Constraint Study (

  4. 2009 Electric Transmission Congestion Study | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the...

  5. Transmission Project Reporting FPA 216h | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Information Center Reporting Transmission Project Reporting FPA 216h Transmission Project Reporting FPA 216h View the searchable database of all transmission projects...

  6. Oahu Wind Integration and Transmission Study (OWITS): Hawaiian...

    Office of Environmental Management (EM)

    Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands...

  7. Electricity transmission congestion costs: A review of recent reports

    E-Print Network [OSTI]

    Lesieutre, Bernard C.; Eto, Joseph H.

    2003-01-01

    LBNL-54049 Electricity Transmission Congestion Costs: Astate of U.S. electricity transmission system and whether itof the U.S. electricity transmission system for enabling

  8. Allocating Transmission to Mitigate Market Power in Electricity Markets

    E-Print Network [OSTI]

    Gilbert, Richard; Neuhoff, Karsten; Newberry, David

    2002-01-01

    A. In Europe most electricity transmission auctions areare possible on every electricity transmission link in thepassive transmission rights in congested electricity systems

  9. Building Registration Plans (Plan Ahead)

    E-Print Network [OSTI]

    Pavlov, Ronnie

    or edit plans you've already created. #12;Now enter your course search requirements. Then click the Search not be offered in the term you are creating. You can search by Subject, Course Number, Keyword, Title, Level to the Registration Screen, click on Plan Ahead. Next, you need to select the term for which you wish to create

  10. Distortion-transmission trade-off in real-time transmission of Gauss-Markov sources

    E-Print Network [OSTI]

    Mahajan, Aditya

    Distortion-transmission trade-off in real-time transmission of Gauss-Markov sources Jhelum.mahajan@mcgill.ca Abstract--The problem of optimal real-time transmission of a Gauss-Markov source under constraints on the expected number of transmissions is considered. This setup is motivated by applica- tions where

  11. Real Time Voice Transmission Darshana Shah Real Time Voice transmission over Wireless medium using

    E-Print Network [OSTI]

    Yu, Chansu

    to 300+ MHz Receiver #12;Real Time Voice Transmission Darshana Shah - 3 - LFTX -- DC-30 MHz TransmitterReal Time Voice Transmission Darshana Shah - 1 - Real Time Voice transmission over Wireless medium Yu 06/07/2009 #12;Real Time Voice Transmission Darshana Shah - 2 - Abstract My project is to transmit

  12. Automated manual transmission mode selection controller

    DOE Patents [OSTI]

    Lawrie, Robert E. (Whitmore Lake, MI)

    1999-11-09

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  13. Automated manual transmission shift sequence controller

    DOE Patents [OSTI]

    Lawrie, Robert E. (Whitmore Lake, MI); Reed, Richard G. (Royal Oak, MI); Rausen, David J. (Denver, CO)

    2000-02-01

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both, an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  14. SUBMITTED TO IEEE TRANSACTIONS ON POWER SYSTEMS, FEBRUARY 2002 1 Quantifying Transmission Reliability Margin

    E-Print Network [OSTI]

    small enough to permit accurate Monte-Carlo simulations. The formula contributes to more accurate congestion contracts. In both planning and operations, transmission capability can be used to assess power centers-small firms collaborative R&D ini- tiative grant EEC-9815325 and grant ECS-9988574 is gratefully

  15. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01

    Impact 12% Renewables (TWh/yr) Geothermal Biomass Resource Composition Hydro Wind SolarImpact 12% Renewables (TWh/yr) Geothermal Biomass Resource Composition Hydro Wind Solarwind and solar in resource portfolios should be explicitly considered in alternative transmission planning scenarios. The impact

  16. Pulse shaping with transmission lines

    DOE Patents [OSTI]

    Wilcox, Russell B. (Oakland, CA)

    1987-01-01

    A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

  17. DOE Transmission System Integration Workshop

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i pStateDOE FederalTheofHeyeck, AEP, Sr. Vice President, Transmission and

  18. Sandia Energy - Transmission Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation of Fe(II)GeothermalFuel Magnetization andStochasticuniqueCuriosity'sTransmission

  19. 2030 Metropolitan Transportation Plan for the Albuquerque Metropolitan Planning Area 

    E-Print Network [OSTI]

    Mid-Region Metropolitan Planning Organization

    2007-04-26

    Transportation Planner Diane Scena, Trails Planner Mark A. Sprick, AICP, Transportation Planning Manager Barbara Thomas, Secretary-Transportation/Water Kendra Watkins, Transportation Planner Eric Webster, Transportation Planner ?4?Q?F?D?J?B?M???5?I?B?O?L... Manager Bruce Rizzieri, Regional Transit Manager Tony Sylvester, AICP, Special Projects Planner Loretta Tollefson, AICP, Special Projects Manager-Mid-Region Rural Transportation Planning Organization ?4?Q?F?D?J?B?M???5?I?B?O?L?T???U?P???U?I?F???.?3...

  20. The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions

    E-Print Network [OSTI]

    transmission right, electricity auction, simultaneous feasibility, transmission pricing. I. INTRODUCTION POINTThe Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions Shi as financial transmission rights (FTRs), resulting from centralized auctions conducted by Independent System

  1. The integration of renewable energy sources into electric power transmission systems

    SciTech Connect (OSTI)

    Barnes, P.R.; Dykas, W.P.; Kirby, B.J.; Purucker, S.L. [Oak Ridge National Lab., TN (United States); Lawler, J.S. [Univ. of Tennessee, Knoxville, TN (United States)

    1995-07-01

    Renewable energy technologies such as photovoltaics, solar thermal power plants, and wind turbines are nonconventional, environmentally attractive sources of energy that can be considered for electric power generation. Many of the areas with abundant renewable energy resources (very sunny or windy areas) are far removed from major load centers. Although electrical power can be transmitted over long distances of many hundreds of miles through high-voltage transmission lines, power transmission systems often operate near their limits with little excess capacity for new generation sources. This study assesses the available capacity of transmission systems in designated abundant renewable energy resource regions and identifies the requirements for high-capacity plant integration in selected cases. In general, about 50 MW of power from renewable sources can be integrated into existing transmission systems to supply local loads without transmission upgrades beyond the construction of a substation to connect to the grid. Except in the Southwest, significant investment to strengthen transmission systems will be required to support the development of high-capacity renewable sources of 1000 MW or greater in areas remote from major load centers. Cost estimates for new transmission facilities to integrate and dispatch some of these high-capacity renewable sources ranged from several million dollars to approximately one billion dollars, with the latter figure an increase in total investment of 35%, assuming that the renewable source is the only user of the transmission facility.

  2. Terahertz Quantum-Cascade Transmission-Line Metamaterials

    E-Print Network [OSTI]

    Tavallaee, Amir Ali

    2012-01-01

    Transmission-Line Metamaterials . . . . . . . Terahertz CRLHCRLH Transmission-Line Metamaterials . . . . . . . 112losses in negative-index metamaterials by optical parametric

  3. Report of the Task Force on Statewide Transmission Siting and...

    Open Energy Info (EERE)

    and disadvantages of a statewide transmission siting and permitting framwork for electric transmission facilities, and provides recommendations for improvement. Author...

  4. Modeling Interregional Transmission Congestion in the National Energy Modeling System

    E-Print Network [OSTI]

    Gumerman, Etan; Chan, Peter; Lesieutre, Bernard; Marnay, Chris; Wang, Juan

    2006-01-01

    to a load center via a DC transmission line such that flowsD.C. 127 pages. Modeling Interregional Transmission

  5. Wind Integration, Transmission, and Resource Assessment andCharacteri...

    Office of Environmental Management (EM)

    Integration, Transmission, and Resource Assessment and Characterization Projects Wind Integration, Transmission, and Resource Assessment and Characterization Projects This report...

  6. Palouse Subbasin Management Plan 3. Management Plan

    E-Print Network [OSTI]

    Palouse Subbasin Management Plan 3. Management Plan FINAL DRAFT ~ May 2004 Project Lead: Palouse-Rock Lake Conservation District Trevor Cook, Project Manager PO Box 438 St. John WA 99171 (509) 648;Palouse Subbasin Plan: MANAGEMENT PLAN Management Plan: Page 3 - 1 3. Management Plan 3.1 Background

  7. Improving cumulative effects assessment in Alberta: Regional strategic assessment

    SciTech Connect (OSTI)

    Johnson, Dallas, E-mail: dallas.johnson@gov.ab.ca; Lalonde, Kim; McEachern, Menzie; Kenney, John; Mendoza, Gustavo; Buffin, Andrew; Rich, Kate

    2011-09-15

    The Government of Alberta, Canada is developing a regulatory framework to better manage cumulative environmental effects from development in the province. A key component of this effort is regional planning, which will lay the primary foundation for cumulative effects management into the future. Alberta Environment has considered the information needs of regional planning and has concluded that Regional Strategic Assessment may offer significant advantages if integrated into the planning process, including the overall improvement of cumulative environmental effects assessment in the province.

  8. Energy-Efficient Transmission Schemes in Cooperative Cellular Systems

    E-Print Network [OSTI]

    Yang, Wei; Wang, Ying; Sun, Wanlu

    2010-01-01

    Energy-efficient communication is an important requirement for mobile devices, as the battery technology has not kept up with the growing requirements stemming from ubiquitous multimedia applications. This paper considers energy-efficient transmission schemes in cooperative cellular systems with unbalanced traffic between uplink and downlink. Theoretically, we derive the optimal transmission data rate, which minimizes the total energy consumption of battery-powered terminals per information bit. The energy-efficient cooperation regions are then investigated to illustrate the effects of relay locations on the energy-efficiency of the systems, and the optimal relay location is found for maximum energy-efficiency. Finally, numerical results are provided to demonstrate the tradeoff between energy-efficiency and spectral efficiency.

  9. ENVIRONMENTAL QUALITY AND REGIONAL ECONOMIC DEVELOPMENT

    E-Print Network [OSTI]

    i ENVIRONMENTAL QUALITY AND REGIONAL ECONOMIC DEVELOPMENT Executive summary Background This report was prepared for the Environmental Conservation Branch, Environment Canada, Vancouver, by CoastWriters Research and environmental planners, to stakeholders in planning processes, to businessmen and community activists

  10. Tribes Provide Input on 10-Year Plan for Renewable Energy in...

    Office of Environmental Management (EM)

    Tribes Provide Input on 10-Year Plan for Renewable Energy in the Arctic Region Tribes Provide Input on 10-Year Plan for Renewable Energy in the Arctic Region June 2, 2015 - 1:56pm...

  11. Who plans for health improvement? SEA, HIA and the separation of spatial planning and health planning

    SciTech Connect (OSTI)

    Bond, Alan; Cave, Ben; Ballantyne, Rob

    2013-09-15

    This study examines whether there is active planning for health improvement in the English spatial planning system and how this varies across two regions using a combination of telephone surveys and focus group interviews in 2005 and 2010. The spatial planning profession was found to be ill-equipped to consider the health and well-being implications of its actions, whilst health professionals are rarely engaged and have limited understanding and aspirations when it comes to influencing spatial planning. Strategic Environmental Assessment was not considered to be successful in integrating health into spatial plans, given it was the responsibility of planners lacking the capacity to do so. For their part, health professionals have insufficient knowledge and understanding of planning and how to engage with it to be able to plan for health gains rather than simply respond to health impacts. HIA practice is patchy and generally undertaken by health professionals outside the statutory planning framework. Thus, whilst appropriate assessment tools exist, they currently lack a coherent context within which they can function effectively and the implementation of the Kiev protocol requiring the engagement of health professionals in SEA is not to likely improve the consideration of health in planning while there continues to be separation of functions between professions and lack of understanding of the other profession. -- Highlights: ? Health professionals have limited aspirations for health improvement through the planning system. ? Spatial planners are ill-equipped to understand the health and well-being implications of their activities. ? SEA and HIA currently do not embed health consideration in planning decisions. ? The separation of health and planning functions is problematic for the effective conduct of SEA and/or HIA.

  12. USDrive Partnership Plan, December 2014

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-Sessions | Department ofVP of TransmissionIT Tools JOHNand DemonstrationPlan

  13. Magnetically insulated transmission line oscillator

    DOE Patents [OSTI]

    Bacon, L.D.; Ballard, W.P.; Clark, M.C.; Marder, B.M.

    1987-05-19

    A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields are produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap. 11 figs.

  14. Superconducting transmission line particle detector

    DOE Patents [OSTI]

    Gray, Kenneth E. (Naperville, IL)

    1989-01-01

    A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

  15. Shock transmissibility of threaded joints

    SciTech Connect (OSTI)

    Hansen, N.R.; Bateman, V.I.; Brown, F.A.

    1996-12-31

    Sandia National Laboratories (SNL) designs mechanical systems with threaded joints that must survive high shock environments. These mechanical systems include penetrators that must survive soil and rock penetration; drilling pipe strings that must survive rock-cutting, shock environments; and laydown weapons that must survive delivery impact shock. This paper summarizes an analytical study and an experimental evaluation of compressive, one-dimensional, shock transmission through a threaded joint in a split Hopkinson bar configuration. Thread geometries were scaled to simulate large diameter threaded joints with loadings parallel to the axis of the threads. Both strain and acceleration were evaluated with experimental measurements and analysis. Analytical results confirm the experimental conclusions that in this split Hopkinson bar configuration, the change in the one-dimensional shock wave by the threaded joint is localized to a length equal to a few diameters` length beyond the threaded joint.

  16. Magnetically insulated transmission line oscillator

    DOE Patents [OSTI]

    Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

    1988-01-01

    A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

  17. Superconducting transmission line particle detector

    DOE Patents [OSTI]

    Gray, K.E.

    1988-07-28

    A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

  18. Grand Coulee Transmission Line Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Reliability Projects Expand Projects Skip navigation links Line Projects Big Eddy-Knight Central Ferry Lower Monumental Grand Coulee Transmission Line Replacement...

  19. WESTERN MONTANA ELECTRIC GENERATING & TRANSMISSION COOPERATIVE, INC.

    E-Print Network [OSTI]

    1 WESTERN MONTANA ELECTRIC GENERATING & TRANSMISSION COOPERATIVE, INC. 1001 SW Higgins, Panorama, but not the more fundamental issues of stakeholder definition, future role, governance and structure. We

  20. DOE Affirms National Interest Electric Transmission Corridor...

    Broader source: Energy.gov (indexed) [DOE]

    requests for rehearing of the Mid-Atlantic and the Southwest Area National Interest Electric Transmission Corridors (National Corridors) designated by DOE in October 2007 as...

  1. Coordination of Federal Authorizations for Electric Transmission...

    Broader source: Energy.gov (indexed) [DOE]

    rulemaking and opportunity for comment on the coordination of federal authorizations for electric transmission facilities, September 19, 2008 Coordination of Federal...

  2. Transmission Services Product Pricing Validation - September...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission-Services-Product-Pricing-Validation---September-17,-2015 Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer...

  3. California - Establishing Transmission Project Review Streamlining...

    Open Energy Info (EERE)

    California - Establishing Transmission Project Review Streamlining Directives Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  4. Transmission eigenvalues for operators with constant coefficients

    E-Print Network [OSTI]

    Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

    2010-04-28

    In this paper we study the interior transmission problem and transmission eigenvalues for multiplicative perturbations of linear partial differential operator of order $\\ge 2$ with constant real coefficients. Under suitable growth conditions on the symbol of the operator and the perturbation, we show the discreteness of the set of transmission eigenvalues and derive sufficient conditions on the existence of transmission eigenvalues. We apply these techniques to the case of the biharmonic operator and the Dirac system. In the hypoelliptic case we present a connection to scattering theory.

  5. Northern Pass Transmission Line Project Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    the location of the September 26 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. On...

  6. Memorandum of Understanding Regarding Transmission Siting on...

    Open Energy Info (EERE)

    Memorandum of Understanding Regarding Transmission Siting on Federal Land (2009) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Memorandum of...

  7. Transmission Services Commercial Systems Support and Development

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Call Agenda This customer conference call will provide updates concerning BPA Transmission Services' commercial systems support and development efforts. It will also provide...

  8. Transmission Line Security Monitor: Final Report

    SciTech Connect (OSTI)

    John Svoboda

    2011-04-01

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  9. Reminder: Transmission Services Product Pricing Validation -...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission-Services-Product-Pricing-Validation---September-24,-2015 Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer...

  10. Memorandum of Understanding Regarding Transmission Siting on...

    Open Energy Info (EERE)

    Memorandum of Understanding Regarding Transmission Siting on Federal Land (2006) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Memorandum of...

  11. State Strategies for Accelerating Transmission Development for...

    Open Energy Info (EERE)

    State Strategies for Accelerating Transmission Development for Renewable Energy Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: State Strategies for...

  12. Flexible Transmission in the Smart Grid

    E-Print Network [OSTI]

    Hedman, Kory Walter

    2010-01-01

    New England Outlook: Smart Grid is About Consumers,” Apr. [Transmission in the Smart Grid By Kory Walter Hedman ATransmission in the Smart Grid by Kory Walter Hedman Doctor

  13. Energy Department, Arizona Utilities Announce Transmission Infrastruct...

    Office of Environmental Management (EM)

    Group, a collection of public power companies that include several Western firm electric and transmission service customers. Western's borrowing authority, received as part...

  14. Wyoming/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Lower Valley Energy, High West Energy, Western Area Power Administration, Bonneville Power Administration, Tri-State Generation and Transmission Association, Inc., and Rocky...

  15. California/Transmission | Open Energy Information

    Open Energy Info (EERE)

    San Diego Gas & Electric, Sacramento Municipal Utility District, PacifiCorp, Bonneville Power Administration, Transmission Agency of Northern California, and Western Area Power...

  16. Nevada/Transmission | Open Energy Information

    Open Energy Info (EERE)

    own transmission facilities in the State of Nevada: NV Energy, Bonneville Power Administration, and Valley Electric Association, Colorado River Commission, Los...

  17. Oregon/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Electric Cooperative, Columbia Grid, Northern Tier Transmission Group, and Bonneville Power Administration. Oregon Energy Policy The Oregon Department of Energy's Governor's...

  18. Detonator comprising a nonlinear transmission line

    DOE Patents [OSTI]

    Elizondo-Decanini, Juan M

    2014-12-30

    Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

  19. Western Area Power Administration Transmission Infrastructure...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    connecting near line's midpoint 161 million in TIP funding; 213 million project cost Substation construction began June 2010 Transmission construction began...

  20. Briefing Memo: Petroleum Product Transmission & Distribution...

    Broader source: Energy.gov (indexed) [DOE]

    PDF of the briefing memo. Briefing Memo More Documents & Publications Briefing Memo: Petroleum Product Transmission & Distribution The Quadrennial Energy Review (Full Report)...

  1. Richard Shaheen named Senior VP of Transmission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    transmission lines and initiated upgrades to Celilo Substation and the Pacific Direct Current Intertie. "Richard is an excellent leader, and his 25-plus years of experience at a...

  2. Proponent's Environmental Assessment (PEA) Checklist for Transmission...

    Open Energy Info (EERE)

    Proponent's Environmental Assessment (PEA) Checklist for Transmission Line and Substation Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Permitting...

  3. Climate Change Action Plan Report

    E-Print Network [OSTI]

    Hansen, Andrew J.

    Climate Change Action Plan Report Intermountain Region 2013 National Park Service Resource Stewardship and Science Landscape Conservation and Climate Change Division #12;About this Report Each National Park Service is responding to the challenge of climate change; and (2) raise awareness among NPS

  4. Simultaneous orientation and thickness mapping in transmission electron microscopy

    SciTech Connect (OSTI)

    Tyutyunnikov, Dmitry; Özdöl, V. Burak; Koch, Christoph T.

    2014-12-04

    In this paper we introduce an approach for simultaneous thickness and orientation mapping of crystalline samples by means of transmission electron microscopy. We show that local thickness and orientation values can be extracted from experimental dark-field (DF) image data acquired at different specimen tilts. The method has been implemented to automatically acquire the necessary data and then map thickness and crystal orientation for a given region of interest. We have applied this technique to a specimen prepared from a commercial semiconductor device, containing multiple 22 nm technology transistor structures. The performance and limitations of our method are discussed and compared to those of other techniques available.

  5. Simultaneous orientation and thickness mapping in transmission electron microscopy

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Tyutyunnikov, Dmitry; Özdöl, V. Burak; Koch, Christoph T.

    2014-12-04

    In this paper we introduce an approach for simultaneous thickness and orientation mapping of crystalline samples by means of transmission electron microscopy. We show that local thickness and orientation values can be extracted from experimental dark-field (DF) image data acquired at different specimen tilts. The method has been implemented to automatically acquire the necessary data and then map thickness and crystal orientation for a given region of interest. We have applied this technique to a specimen prepared from a commercial semiconductor device, containing multiple 22 nm technology transistor structures. The performance and limitations of our method are discussed and comparedmore »to those of other techniques available.« less

  6. Hawaii Bioenergy Master Plan Economic Impacts

    E-Print Network [OSTI]

    Hawaii Bioenergy Master Plan Economic Impacts Prepared for The Hawaii Natural Energy Institute By Makena Coffman Department of Urban & Regional Planning University of Hawaii at Manoa December 2009 #12;i, a macroeconomic model of Hawaii's economy, representing macro and sector-level inter-linkages, has been created

  7. WATER QUALITY PLAN MONITORING DATA REPORT

    E-Print Network [OSTI]

    #12;WATER QUALITY PLAN MONITORING DATA REPORT January to March 1993 TECHNICAL REPORT SERIES FREMP WQWM 93-02 DOE FR4P 1993-31 Prepared for FREMP Water QualityAVaste Management Committee by Don Morse PACIFIC REGION #12;Canadian Cataloging in Publication Data Main entry under title Water quality plan

  8. Low Frequency Transmission Final Project Report

    E-Print Network [OSTI]

    Low Frequency Transmission Final Project Report Power Systems Engineering Research Center Empowering Minds to Engineer the Future Electric Energy System #12;Low Frequency Transmission Final Project This is the final report for the Power Systems Engineering Research Center (PSERC) research project S-42 titled "Low

  9. Policy Issues for Retail Beamed Power Transmission

    E-Print Network [OSTI]

    electric power on Earth is transmitted using wired power transmission systems. In this system, electricalPolicy Issues for Retail Beamed Power Transmission Girish Chowdhary, Rajeev Gadre, Narayanan solar electric power using retail delivery of beamed power. Recent advances in power beaming have made

  10. Spatial mode properties of plasmon assisted transmission

    E-Print Network [OSTI]

    Xi-Feng Ren; Guo-Ping Guo; Yun-Feng Huang; Zhi-Wei Wang; Guang-Can Guo

    2006-09-11

    Orbital angular momentum of photons is explored to study the spatial mode properties of plasmon assisted transmission process. We found that photons carrying different orbital angular momentums have different transmission efficiencies, while the coherence between these spatial modes can be preserved.

  11. Ecological benefits of dc power transmission

    SciTech Connect (OSTI)

    Kutuzova, N. B.

    2011-05-15

    The environmental effects of dc overhead transmission lines are examined. The major effects of ac and dc transmission lines are compared. Dc lines have advantages compared to ac lines in terms of electrical safety for people under the lines, biological effects, corona losses, and clearance width.

  12. Neuromotor Transmissibility of Horizontal Seatpan Vibration

    E-Print Network [OSTI]

    Channamallu, Raghu Ram

    2007-12-16

    for a frequency range of 3-14 Hz at 1 RMS (ms-2) and 2 RMS (ms-2) vibration magnitudes. The mechanical transmission to lumbar rotations did not exhibit resonance within the measured frequency range without the backrest. The mechanical transmission with a...

  13. The New York Transmission Congestion Contract Market

    E-Print Network [OSTI]

    Oren, Shmuel S.

    The New York Transmission Congestion Contract Market: Is It Truly Working Efficiently? An analysis indicates that the financial point-to-point transmission rights auction implemented by the New York, Elsevier Inc., 1040-6190/$­see front matter doi:/10.1016/j.tej.2003.09.006 1 #12;spring of 2000 in the New

  14. Renewable Energy Transmission Initiative Phase 1A

    E-Print Network [OSTI]

    Renewable Energy Transmission Initiative Phase 1A DRAFT REPORT MARCH 2008 RETI-1000-2008-001-D #12;RETI Stakeholder Steering Committee Renewable Energy Transmission Initiative Phase 1A DRAFT REPORT B are registered trademarks of Black & Veatch Holding Company #12;RETI Stakeholder Steering Committee Renewable

  15. Lift-and-Project Relaxations of AC Microgrid Distribution System Planning

    E-Print Network [OSTI]

    Taylor, Joshua A.

    2011-01-01

    We apply relaxation procedures to polynomial optimization problems that originate in transmission system planning, and obtain new convex formulations for the AC case. The approach is novel because the optimization is ...

  16. Recent Developments in the Regulation of Electric Utility Resource Planning in Texas 

    E-Print Network [OSTI]

    Totten, J.; Adib, P.; Matlock, R.; Treadway, N.

    1993-01-01

    The Texas Legislature has charged the Public Utility Commission of Texas with the responsibility to license utility power plants and transmission lines, and develop a statewide electrical energy plan. Related duties include the encouragement...

  17. Implications of Model Structure and Detail for Utility Planning. Scenario Case Studies using the Resource Planning Model

    SciTech Connect (OSTI)

    Mai, Trieu; Barrows, Clayton; Lopez, Anthony; Hale, Elaine; Dyson, Mark; Eurek, Kelly

    2015-04-23

    We examine how model investment decisions change under different model configurations and assumptions related to renewable capacity credit, the inclusion or exclusion of operating reserves, dispatch period sampling, transmission power flow modeling, renewable spur line costs, and the ability of a planning region to import and export power. For all modeled scenarios, we find that under market conditions where new renewable deployment is predominantly driven by renewable portfolio standards, model representations of wind and solar capacity credit and interactions between balancing areas are most influential in avoiding model investments in excess thermal capacity. We also compare computation time between configurations to evaluate tradeoffs between computational burden and model accuracy. From this analysis, we find that certain advanced dispatch representations (e.g., DC optimal power flow) can have dramatic adverse effects on computation time but can be largely inconsequential to model investment outcomes, at least at the renewable penetration levels modeled. Finally, we find that certain underappreciated aspects of new capacity investment decisions and model representations thereof, such as spur lines for new renewable capacity, can influence model outcomes particularly in the renewable technology and location chosen by the model. Though this analysis is not comprehensive and results are specific to the model region, input assumptions, and optimization-modeling framework employed, the findings are intended to provide a guide for model improvement opportunities.

  18. Cost estimation of HVDC transmission system of Bangka’s NPP candidates

    SciTech Connect (OSTI)

    Liun, Edwaren Suparman

    2014-09-30

    Regarding nuclear power plant development in Bangka Island, it can be estimated that produced power will be oversupply for the Bangka Island and needs to transmit to Sumatra or Java Island. The distance between the regions or islands causing considerable loss of power in transmission by alternating current, and a wide range of technical and economical issues. The objective of this paper addresses to economics analysis of direct current transmission system to overcome those technical problem. Direct current transmission has a stable characteristic, so that the power delivery from Bangka to Sumatra or Java in a large scale efficiently and reliably can be done. HVDC system costs depend on the power capacity applied to the system and length of the transmission line in addition to other variables that may be different.

  19. Strategic Planning for Landowners 

    E-Print Network [OSTI]

    Johnson, Jason; Polk, Wade

    2008-09-16

    Strategic planning is crucial to the success of any business. This publication explains the planning process, from establishing the mission, to setting goals, to developing a business plan....

  20. Guidance for Planning Exercises

    Office of Environmental Management (EM)

    blank table of contents Transportation Emergency Preparedness Program (TEPP) planning tools planning tools Guidance f Guidance f Guidance f Guidance f Guidance for Planning,...

  1. Walkability Planning in Jakarta

    E-Print Network [OSTI]

    Lo, Ria S. Hutabarat

    2011-01-01

    key goals in relation to pedestrian planning? What trends dotransportation and planning in Jakarta in the future?pedestrian research or planning in Indonesia, the notion of

  2. Unpredictability and the transmission of numbers

    E-Print Network [OSTI]

    Myers, John M

    2015-01-01

    Curiously overlooked in physics is its dependence on the transmission of numbers. For example the transmission of numerical clock readings is implicit in the concept of a coordinate system. The transmission of numbers and other logical distinctions is often achieved over a computer-mediated communications network in the face of an unpredictable environment. By unpredictable we mean something stronger than the spread of probabilities over given possible outcomes, namely an opening to unforeseeable possibilities. Unpredictability, until now overlooked in theoretical physics, makes the transmission of numbers interesting. Based on recent proofs within quantum theory that provide a theoretical foundation to unpredictability, here we show how regularities in physics rest on a background of channels over which numbers are transmitted. As is known to engineers of digital communications, numerical transmissions depend on coordination reminiscent of the cycle of throwing and catching by players tossing a ball back and...

  3. Adaptation Plan 

    E-Print Network [OSTI]

    Durnbaugh, A.

    2011-01-01

    Response Update the extreme weather operation plan, focusing on vulnerable populations. Add climate-sensitive disease surveillance. Roads Pilot & implement new road materials to manage stormwater, decrease urban heat island effect, & maintain... and dry summers Source: Hayhoe et al. Journal of Great Lakes Research, 2010. Summers % changes relative to a 1961-1990 average ESL-KT-11-11-16 6 What is CCAP? Our goals to reduce Chicago?s greenhouse gas emissions and prepare for climate change?s...

  4. STRATEGIC PLAN

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematics AndBeryllium Disease |Records Management FieldSOLANA SOLANA SOLANA SOLANA-2020 STRATEGIC PLAN and

  5. Plan Execution Failure Analysis Using Plan Deconstruction 

    E-Print Network [OSTI]

    McNeill, F.; Bundy, Alan; Walton, Ch.; Schorlemmer, Marco

    We consider the challenges that arise when plans are based on an incorrect representation of the domain in which they are executed. We describe how information about plan formation, and how the way in which each plan step ...

  6. Groundwater planning in Texas: paradigm shifts and implications for the future 

    E-Print Network [OSTI]

    Kelly, Vanessa Christine

    2009-05-15

    Senate Bill 1 and HB 1763 have greatly changed Texas water planning. With SB1 the planning process became a bottom-up approach that allowed 16 regional water planning groups (RWPGs) to create a plan that would be combined to form the state plan...

  7. Wireless Transmission of Monitoring Data out of the HADES Underground Laboratory - 12450

    SciTech Connect (OSTI)

    Schroeder, T.J.; Hart, J. [Nuclear Research and Consultancy Group (NRG), P.O. Box 25, NL-1755 ZG Petten (Netherlands)

    2012-07-01

    As part of the European 7. framework project MoDeRn, Nuclear Research and Consultancy Group (NRG) performed experiments in order to demonstrate the feasibility of wireless data transmission through the subsurface over larger distances by low frequency magnetic fields. The main objective of NRG's contribution is to characterize and optimize the energy use of this technique within the specific context of post-closure monitoring. For this, measurements have been performed in the HADES underground laboratory located at Mol, Belgium, at 225 m depth. The experimental set-up makes use of a loop antenna for the transmitter that has been matched into the existing infrastructure of the HADES. The experimental work of NRG is divided into several stages: in 2010, the necessary hardware has been designed and assembled and tested in the Netherlands. Site-specific magnetic background noise in Mol and frequency-dependent signal attenuation by the geologic medium has been measured. Signal transmission has been demonstrated and several transmission channels around 1 kHz have been identified. In 2011, additional measures and experiments have been performed in order to characterize and test relevant element of the transmission chain and to optimize the energy use of the set-up. A mathematical model description has been developed that includes the most relevant characteristics of the transmitter, receiver and transmission path and was used to analyse possible options to optimize the set-up. In 2012, experiments are planned in order to test several data transmission options. Results so far have shown that signal transmission over larger distances through the subsurface is feasible. However, to make quantitative conclusions on the energy need per bit of transmitted data, additional experiments planned in 2012 are necessary. The experimental and theoretical results gained by NRG, as part of the European 7. framework project MoDeRn, so far demonstrated that signal transmission through 225 m of a geological medium is feasible, even in case of a 'good conductor' as present in Mol. At this particular site the transmission distance through the different layers of clay and sandy aquifers is larger than the skin depth and clearly extends the near-field. The step from signal to data transmission will be made in 2012 and is essential to be able to make quantitative statements of the energy use per transmitted data bit. (authors)

  8. Roadmap: Associate of Arts Regional College

    E-Print Network [OSTI]

    Sheridan, Scott

    Roadmap: Associate of Arts [RE-AA-AA] Regional College Catalog Year: 2012-2013 Page 1 of 2 | Last Updated: 12-Mar-12/LNHD This roadmap is a recommended semester-by-semester plan of study for this major GPA Overall GPA 61 2.000 2.000 #12;Roadmap: Associate of Arts [RE-AA-AA] Regional College Catalog Year

  9. Roadmap: Associate of Arts Regional College

    E-Print Network [OSTI]

    Sheridan, Scott

    Roadmap: Associate of Arts [RE-AA-AA] Regional College Catalog Year: 2013-2014 Page 1 of 2 | Last Updated: 27-Feb-13/LNHD This roadmap is a recommended semester-by-semester plan of study for this major.000 #12;Roadmap: Associate of Arts [RE-AA-AA] Regional College Catalog Year: 2013-2014 Page 2 of 2 | Last

  10. Roadmap: Associate of Science Regional College

    E-Print Network [OSTI]

    Sheridan, Scott

    Roadmap: Associate of Science [RE-AS-AS] Regional College Catalog Year: 2013-2014 Page 1 of 2 | Last Updated: 27-Feb-13/LNHD This roadmap is a recommended semester-by-semester plan of study.000 #12;Roadmap: Associate of Science [RE-AS-AS] Regional College Catalog Year: 2013-2014 Page 2 of 2

  11. Roadmap: Associate of Science Regional College

    E-Print Network [OSTI]

    Sheridan, Scott

    Roadmap: Associate of Science [RE-AS-AS] Regional College Catalog Year: 2012-2013 Page 1 of 2 | Last Updated: 12-Mar-12/LNHD This roadmap is a recommended semester-by-semester plan of study GPA Overall GPA 61 2.000 2.000 #12;Roadmap: Associate of Science [RE-AS-AS] Regional College Catalog

  12. Regional Analysis of Impediments to Fair

    E-Print Network [OSTI]

    Capecchi, Mario R.

    participated in the HUD Sustainable Communities Regional Planning Grant. This grant was awarded to Salt Lake to this effort was the local HUD office. Kelly Jorgenson, Pauline Zvonkovic, and Michele Hutchins were invaluable included representatives from: Salt Lake HUD office, Wasatch Front Regional Council (MPO), Mountainland

  13. CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN

    E-Print Network [OSTI]

    Kim, Duck O.

    Biological Safety Officer Ergonomic Specialist 2723 Radiation Safety 2250 Facilities Management Office 2125. ANNUAL REVIEW AND EVALUATION OF EFFECTIVENESS OF THE CHEMICAL HYGIENE PLAN 9. HAZARD COMMUNICATION PLAN

  14. Business Services Strategic Plan

    E-Print Network [OSTI]

    Pittendrigh, Barry

    Business Services Strategic Plan Updated September 2008 New Synergies: Launching Tomorrow's Leaders. Facilitate implementation of the University Strategic Plan 2. Analyze, plan, and manage University finances, processes, and contracts in global and strategic partnerships 3. Review existing capital financing plans

  15. Introduction to Transportation Planning

    E-Print Network [OSTI]

    Tipple, Brett

    Introduction to Transportation Planning CMP 4710/6710 Fall 2012 3 Credit Hours Room: ARCH 229 of City & Metropolitan Planning; Associate Dean, College of Architecture + Planning; former associate, social equity, fiscal health, and public health. Unfortunately, most transportation planning processes

  16. National Strategy for the Arctic Region Stakeholder Outreach Meeting: Anchorage

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) is announcing the second round of tribal consultations and stakeholder outreach meetings on the National Strategy for the Arctic Region (NSAR), 10-Year Plan to accelerate renewable energy deployment in the Arctic Region. The purpose of this round is to give feedback on the elements of the draft plan.

  17. Conductive Channel for Energy Transmission

    SciTech Connect (OSTI)

    Apollonov, Victor V. [A.M. Prokhorov General Physics Institute, Vavilov Str. 38, Moscow, 119991 (Russian Federation)

    2011-11-10

    For many years the attempts to create conductive channels of big length were taken in order to study the upper atmosphere and to settle special tasks, related to energy transmission. There upon the program of creation of 'Impulsar' represents a great interest, as this program in a combination with high-voltage high repetition rate electrical source can be useful to solve the above mentioned problems (N. Tesla ideas for the days of high power lasers). The principle of conductive channel production can be shortly described as follows. The 'Impulsar' - laser jet engine vehicle - propulsion take place under the influence of powerful high repetition rate pulse-periodic laser radiation. In the experiments the CO{sub 2}-laser and solid state Nd:YAG laser systems had been used. Active impulse appears thanks to air breakdown (<30 km) or to the breakdown of ablated material on the board (>30 km), placed in the vicinity of the focusing mirror-acceptor of the breakdown waves. With each pulse of powerful laser the device rises up, leaving a bright and dense trace of products with high degree of ionization and metallization by conductive nano-particles due to ablation. Conductive dust plasma properties investigation in our experiments was produced by two very effective approaches: high power laser controlled ablation and by explosion of wire. Experimental and theoretical results of conductive canal modeling will be presented. The estimations show that with already experimentally demonstrated figures of specific thrust impulse the lower layers of the Ionosphere can be reached in several ten seconds that is enough to keep the high level of channel conductivity and stability with the help of high repetition rate high voltage generator. Some possible applications for new technology are highlighted.

  18. Regional Purchasing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMassR&D100 Winners * ImpactsandRegarding ConfinementRegional Partnerships

  19. A NEW HIGH ENERGY RESOLUTION NEUTRON TRANSMISSION DETECTOR SYSTEM AT THE GAERTTNER LINAC LABORATORY

    E-Print Network [OSTI]

    Danon, Yaron

    Laboratory P.O. Box 1072, Schenectady, New York 12301-1072 A new high energy resolution modular neutronA NEW HIGH ENERGY RESOLUTION NEUTRON TRANSMISSION DETECTOR SYSTEM AT THE GAERTTNER LINAC LABORATORY capabilities at the Laboratory in and above the resolved resonance energy region from 1 keV to 600 ke

  20. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory ofDidDevelopment TopMetathesis and Oxidation of MetalStrategic Plan

  1. Dental Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HAB Packet HanfordDOEDanielDe novo DesignNeudeckerDental Plan Dental

  2. Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effectWorking WithTelecentricNCubictheThepresented in the7 Table7Work &Work Plan

  3. Retirement Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation of Fe(II) byMultiday ProductionDesigningResources Thomas JeffersonRetirement Plan

  4. Retirement Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation of Fe(II) byMultiday ProductionDesigningResources Thomas JeffersonRetirement Plan

  5. Plans, Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesseworkSURVEYI/OPerformancePi Day Pi Day Pi Day isPlanning for Life On

  6. NDN, VOLUME TRANSMISSION, AND SELF-ORGANIZATION IN BRAIN DYNAMICS

    E-Print Network [OSTI]

    Freeman, Walter J.

    NDN, VOLUME TRANSMISSION, AND SELF- ORGANIZATION IN BRAIN DYNAMICS WALTER J FREEMAN Department for the field synchrony: electric fields; magnetic fields; electromagnetic fields (radio waves); diffusion transmission by nonsynaptic diffusion transmission, in concert with the self- organization of the textured

  7. Estimating the Actual Cost of Transmission System Congestion

    E-Print Network [OSTI]

    with electric transmission. One such component is transmission system conEstimating the Actual Cost of Transmission System Congestion Thomas J. Overbye Department of Electrical and Computer Engineering University of Illinois at Urbana-Champaign Urbana, IL 61801 USA overbye

  8. Transmission enhancement through deep subwavelength apertures using connected split

    E-Print Network [OSTI]

    Transmission enhancement through deep subwavelength apertures using connected split ring resonators transmission enhancement factors through a subwavelength aperture at microwave frequencies by placing connected transmission through a deep subwavelength aperture with an electrical size of /31×/12 (width × length

  9. The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions

    E-Print Network [OSTI]

    such convergence. Index Terms-- financial transmission right, electricity auction, simultaneous feasibilityThe Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions Shi as financial transmission rights (FTRs), resulting from centralized auctions conducted by Independent System

  10. Venus Technology Plan Venus Technology Plan

    E-Print Network [OSTI]

    Rathbun, Julie A.

    Venus Technology Plan May 2014 #12; ii Venus Technology Plan At the Venus Exploration Survey priorities, and (3) develop a Technology Plan for future Venus missions (after a Technology Forum at VEXAG Meeting 11 in November 2013). Here, we present the 2014 Venus Technology Plan

  11. Strategic Plan Strategic Plan 20102015 1

    E-Print Network [OSTI]

    Strategic Plan 2010­2015 #12;#12;#12;#12;Strategic Plan 2010­2015 1 Table of Contents Message from. . . . . . . . 36 #12;2 College of Geosciences Message from the Dean This strategic plan has come together in an era and #12;Strategic Plan 2010­2015 3 human capital. With respect to research it is clear that the College

  12. Strategic Plan update Strategic Plan 201020

    E-Print Network [OSTI]

    Rambaut, Andrew

    Strategic Plan update Strategic Plan 2010­20: Two-year update February 2012 #12;1 Strategic-year Wellcome Trust Strategic Plan for 2010­20. It describes how we will work to further our vision of achieving in our Annual Review and Assessment Framework Reports. Implementing our Strategic Plan ­ highlights

  13. Privacy Management Plan 1 Privacy Management Plan

    E-Print Network [OSTI]

    University of Technology, Sydney

    Privacy Management Plan 1 Privacy Management Plan Abstract The Privacy Management Plan outlines how Impact Assessment Tool (.docm) (staff only) Records Management Vice-Chancellor's Directive Handling Management Plan 2 Legislation Privacy and Personal Information Protection Act 1998 (NSW) (PPIPIA) Health

  14. EIS-0005-S2: Bonneville Power Administration Proposed FY 1979 Program Facility Planning Supplement Southwest Oregon Area Service, Supplemental

    Broader source: Energy.gov [DOE]

    This statement, one of a series prepared by the U.S. Department of Energy’s Bonneville Power Administration on various facets of its construction and maintenance activities, addresses the potential impact of a major new facility proposed for fiscal year 1979. To allow power generated in Wyoming to be delivered to Southwest Oregon and to facilitate the exchange of electric power between the Pacific Northwest and the Middle Snake region, two basic plans of service, each with two corridor routing options, have been identified to meet system requirements. BPA proposes construction of the following two transmission facilities: (1) a 500-kV line from Idaho Power Company's Brownlee Substation in Idaho to BPA's Slatt Substation near Arlington, Oregon, and (2) a 500-kV line from Buckley (near Maupin, Oregon) to Malin, Oregon. This statement must be reviewed and used in conjunction with the overall programmatic environmental statement entitled ""The Role of the Bonneville Power Administration in the Pacific Northwest Power Supply System, Including Its Participation in the Hydro-Thermal Power Program: A Program Environmental Statement and Planning Report (The ""Role EIS""), particularly Appendix B - BPA Power Transmission.

  15. Flexible Transmission in the Smart Grid

    E-Print Network [OSTI]

    Hedman, Kory Walter

    2010-01-01

    E. B. Fisher, S. S. Oren, “Smart flexible just-in-timeISO New England Outlook: Smart Grid is About Consumers,”Flexible Transmission in the Smart Grid By Kory Walter

  16. EIS-0285: Transmission System Vegetation Management Program

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations. This...

  17. Inverse transmission problems for magnetic Schrödinger operators

    E-Print Network [OSTI]

    Katsiaryna Krupchyk

    2011-12-16

    This paper is concerned with the study of inverse transmission problems for magnetic Schr\\"odinger operators on bounded domains and in all of the Euclidean space, in the self-adjoint case. Assuming that the magnetic and electric potentials are known outside of a transparent obstacle, in the bounded domain case, we show that the obstacle, the transmission coefficients, as well as the magnetic field and electric potential inside the obstacle are uniquely determined from the knowledge of the set of the Cauchy data for the transmission problem, given on an open subset of the boundary of the domain. In the case of the transmission scattering problem, we obtain the same conclusion, when the scattering amplitude at a fixed frequency is known. The problems studied in this work were proposed in [15].

  18. Load-resistant coaxial transmission line

    DOE Patents [OSTI]

    Hall, David R.; Fox, Joe

    2006-01-03

    A transmission line for downhole tools that make up all or part of a tool string for drilling and production of oil, gas, and geothermal wells that can withstand the dynamic gravitational forces and other accelerations associated with downhole excavations. The transmission line has a metal tube, or outer conductor, that houses a coaxial wire inner conductor. A non-metallic dielectric material is interposed between the inner and outer conductors. The outer and inner conductors and the dielectric are sufficiently compressed together so that independent motion between them is abated. Compression of the components of the transmission line may be achieved by drawing the transmission through one or more dies in order to draw down the outer conductor onto the dielectric, or by expanding the inner conductor against the dielectric using a mandrel or hydraulic pressure. Non-metallic bead segments may be used in aid of the compression necessary to resist the dynamic forces and accelerations of drilling.

  19. Electric Power Generation and Transmission (Iowa)

    Broader source: Energy.gov [DOE]

    Electric power generating facilities with a combined capacity greater than 25 MW, as well as associated transmission lines, may not be constructed or begin operation prior to the issuance of a...

  20. Transmission Character of General Function Photonic Crystals

    E-Print Network [OSTI]

    Xiang-Yao Wu; Bo-Jun Zhang; Jing-Hai Yang; Si-Qi Zhang; Xiao-Jing Liu; Jing Wang; Nuo Ba; Zhong Hua; Xin-Guo Yin

    2012-12-01

    In the paper, we present a new general function photonic crystals (GFPCs), which refractive index of medium is a arbitrary function of space position. Unlike conventional photonic crystals (PCs), which structure grow from two mediums $A$ and $B$, with different constant refractive indexes $n_{a}$ and $n_{b}$. Based on Fermat principle, we give the motion equations of light in one-dimensional GFPCs, and calculate its transfer matrix, which is different from the conventional PCs. We choose the linearity refractive index function for two mediums $A$ and $B$, and find the transmissivity of one-dimensional GFPCs can be much larger or smaller than 1 for different slope linearity refractive index function, which is different from the transmissivity of conventional PCs (its transmissivity is in the range of 0 and 1). Otherwise, we study the effect of different incident angles, the number of periods and optical thickness on the transmissivity, and obtain some new results different from the conventional PCs.