1

Regional Transmission Planning Webinar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regional Transmission Planning Webinar Regional Transmission Planning Webinar Regional Transmission Planning Webinar May 29, 2013 11:00AM MDT Webinar The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration (WAPA) are pleased to continue their sponsorship of the Tribal Renewable Energy Webinar Series. As part of a process to develop interconnection-based transmission plans for the Eastern and Western Interconnections and the Electric Reliability Council of Texas (ERCOT), the eight U.S. regional reliability organizations are expanding existing regional transmission planning activities and broadening stakeholder involvement. Hear about the status of the organizations' plans and evaluations of long-term regional transmission

2

Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Transmission Planning We accept requests from electric utilities, firm-power customers, private power developers, and independent power generators to interconnect...

3

The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations  

Science Conference Proceedings (OSTI)

Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second, market and reliability rules have, understandably, been written around the capabilities and limitations of generators, the historic reliability resources. Responsive load limitations and capabilities are often not accommodated in markets or reliability criteria. Third, because of the institutional structure, demand response alternatives are treated as temporary solutions that can delay but not replace transmission enhancement. Financing has to be based on a three to five year project life as opposed to the twenty to fifty year life of transmission facilities. More can be done to integrate demand response options into transmission expansion planning. Given the societal benefits it may be appropriate for independent transmission planning organizations to take a more proactive role in drawing demand response alternatives into the resource mix. Existing demand response programs provide a technical basis to build from. Regulatory and market obstacles will have to be overcome if demand response alternatives are to be routinely considered in transmission expansion planning.

Kirby, Brendan J [ORNL

2006-07-01T23:59:59.000Z

4

Interconnection Transmission Planning: Awards | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and...

5

10-Yr. Transmission Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

6

Transmission Expansion Planning with Re-design  

E-Print Network (OSTI)

Aug 3, 2009 ... Abstract: Expanding an electrical transmission network requires heavy investments that need to be carefully planned, often at a regional or ...

7

Transmission planning in China  

Science Conference Proceedings (OSTI)

Though China is well along in restructuring its power markets, it still has some way to travel before economic considerations receive adequate weight in transmission planning decisions. Adoption of more sophisticated tools such as multi-agent modeling will help China continue in its progress in achieving this. (author)

Dong, Jun; Zhang, Jing

2009-07-15T23:59:59.000Z

8

Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission  

E-Print Network (OSTI)

Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission Summary of Key..................................................................................................................................... 1 Northwest Transmission Planning), there was concern that there had been little progress on addressing the developing transmission issues in the region

9

Regional Transmission Projects: Finding Solutions  

Science Conference Proceedings (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

10

PROPOSAL FOR CONTINGENT TRANSMISSION PLANS  

E-Print Network (OSTI)

How should the WECC’s RTEP process develop a 10-year transmission plan based upon transmission studies completed over the past several years? This paper explores the notion of a “plan ” that consists of a package containing a small number of “contingent plans ” that would correspond to a limited number of future states of the world by 2020. The rationale for developing transmission plans on a contingent basis is based on the following observations. Contingencies. Insights from TEPPC transmission planning over the past several years indicate that the demand for future transmission expansion in the West is contingent upon a number of important drivers including: (1) Levels of state renewable portfolio standards (RPS); (2) Development of remote versus local renewable generation; (3) Load growth given DSM policies and economic growth; (4) Policies to reduce greenhouse gas (GHG) emissions; (5) Shifts of innovation and cost competitiveness between wind and solar energy; (6) Advances in distributed generation technologies;

unknown authors

2010-01-01T23:59:59.000Z

11

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

cable transmission systems:5 two 500 kV circuits, a high-voltage direct current (HVDC) system and two to serve VI and the HVDC link is expected to be completely retired in 2007. This erosion in transmission / replacement of the HVDC cables (at a cost of $230 million), as well as transmission upgrades on the mainland

12

Efficiency Benefits of EHV AC Transmission and Overlays in Interregional Transmission Expansion Planning  

Science Conference Proceedings (OSTI)

In the United States, transmission expansion planning historically focused on addressing local utility transmission needs. In the mid-to-late 1990s, the focus shifted to encompass regional transmission expansion, primarily driven by Federal Energy Regulatory Commission (FERC) mandates on open transmission access and emergence of regional transmission organizations. In recent years, three drivers have elevated transmission expansion planning to a higher, interregional level. These drivers are the ...

2012-11-29T23:59:59.000Z

13

Interconnection-Wide Transmission Planning Initiative: Topic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency...

14

Interconnection-Wide Transmission Planning Initiative: Topic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection...

15

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

involves the construction of an approximate 1000 mile HVAC and HVDC transmission project from British ACSR. (Northern Segment) b) A 3000 MVA, 500 kV HVAC to +/-500 kV HVDC Converter at the NEO Station. c) A +/-500 kV HVDC line from the NEO Station to the proposed Collinsville Substation in the San Francisco Bay

16

Transmission Planning | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

17

Flexible and Strategic Transmission Planning  

Science Conference Proceedings (OSTI)

This update describes two separate but related planning frameworks developed for this project: 1) balancing of reliability and economics in transmission planning and 2) consideration of the need for operational flexibility in planning. Projects that improve reliability can also improve economics, and vice versa. The challenge is in achieving the reliability goals with as much economic benefit as possible, in other words, balancing the reliability and economic goals without compromising either. A method o...

2011-12-22T23:59:59.000Z

18

10 Year Transmission Plan for the Western Electricity Interconnection  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 Year Transmission Plan for the Western Electricity 10 Year Transmission Plan for the Western Electricity Interconnection Released 10 Year Transmission Plan for the Western Electricity Interconnection Released October 3, 2011 - 8:11am Addthis Western Electricity Coordinating Council releases its first-ever transmission plan for the Western Interconnection. The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities. Looking ahead to 2020, the Plan focuses on how to meet the Western Interconnection's transmission requirements, including transmission

19

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

20

Transmission Planning for Wind Energy: Status and Prospects  

Science Conference Proceedings (OSTI)

This paper provides an overview of major transmission planning activities related to wind integration studies in the US and Europe. Transmission planning for energy resources is different from planning for capacity resources. Those differences are explained, and illustrated with examples from several regions of the US and Europe. Transmission planning for wind is becoming an iterative process consisting of generation expansion planning, economic-based transmission planning, system reliability analysis, and wind integration studies. A brief look at the policy environment in which this activity is taking place is provided.

Smith, J. C.; Osborn, D.; Piwko, R.; Zavadil, R.; Parsons, B.; Hawkins, D.; Lasher, W.; Nickell, B.

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Alternative Transmission Technologies for Joint Planning Studies  

Science Conference Proceedings (OSTI)

This report describes a detailed analysis of joint transmission planning needs and capabilities, including an assessment of current research in the area. The report has value as a starting point and reference for transmission planners engaged in joint planning exercises because it focuses on technologies that could facilitate joint transmission planning of a bulk power grid. A joint planning exercise involves the collaboration of multiple transmission planning groups that may each have ...

2013-12-09T23:59:59.000Z

22

Transportation Center Seminar........ "Proactive Transmission Planning in  

E-Print Network (OSTI)

Transportation Center Seminar........ "Proactive Transmission Planning in Electricity Networks of the biggest problems of actual power-systems transmission planning is its reactive nature. We formulate-systems transmission planning, generation investment, and market operation decisions and propose a methodology to solve

Bustamante, Fabián E.

23

Economics of Transmission Planning: Methods, Examples, and Tools  

Science Conference Proceedings (OSTI)

This report describes an economic planning methodology that can be applied to regional and interregional transmission planning. It is modeled after long-distilled practices at the Midwest Independent System Operator (MISO) and a newer, proposed analysis for identifying the potential interregional developments of greatest mutual benefit to the energy trading regions. Existing and new examples of transmission planning exercises conducted by MISO facilitate the description. MISO background studies introduce...

2011-12-30T23:59:59.000Z

24

Regional hydrothermal commercialization plan  

SciTech Connect

This plan for the Rocky Mountain Basin and Range Region articulates the complete range of initiatives (federal, state, local, and industrial) required for the early commercialization of the regions geothermal resources. (MHR)

1978-07-14T23:59:59.000Z

25

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

26

Transmission Expansion Planning with Re-design  

E-Print Network (OSTI)

Expanding an electrical transmission network requires heavy investments ... Long term transmission expansion planning determines, over an horizon of 10 or more years, ... generation sites are usually far away from the consumption centers.

27

WECC releases its first-ever transmission plan for the Western Interconnection  

Energy.gov (U.S. Department of Energy (DOE))

The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection.

28

WECC releases its first-ever transmission plan for the Western...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Interconnection. The Plan was developed through WECC's Regional Transmission Expansion Planning (RTEP) project, as part of a grant from the U.S. Department of Energy...

29

Transmission Expansion Planning Using an AC Model  

E-Print Network (OSTI)

Jan 2, 2013 ... Abstract: Transmission expansion planning (TEP) is a rather complicated process which requires extensive studies to determine when, where ...

30

May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 29 Tribal Renewable Energy Webinar to Highlight Regional May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 24, 2013 - 3:41pm Addthis The U.S. Department of Energy Office of Indian Energy, the DOE Office of Energy Efficiency and Renewable Energy's Tribal Energy Program, and the Western Area Power Administration (WAPA) will present the next Tribal Renewable Energy Series webinar, "Regional Transmission Planning," on Wednesday, May 29, 2013, from 1:00 p.m. to 2:30 p.m. Eastern Time. Speakers from WAPA's Rocky Mountain Region, its Upper Great Plains Region, and WestConnect will provide an overview of various interconnection-based regional transmission planning efforts. Helpful background information on

31

May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 29 Tribal Renewable Energy Webinar to Highlight Regional May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 24, 2013 - 3:41pm Addthis The U.S. Department of Energy Office of Indian Energy, the DOE Office of Energy Efficiency and Renewable Energy's Tribal Energy Program, and the Western Area Power Administration (WAPA) will present the next Tribal Renewable Energy Series webinar, "Regional Transmission Planning," on Wednesday, May 29, 2013, from 1:00 p.m. to 2:30 p.m. Eastern Time. Speakers from WAPA's Rocky Mountain Region, its Upper Great Plains Region, and WestConnect will provide an overview of various interconnection-based regional transmission planning efforts. Helpful background information on

32

Transmission Planning: Institutional Issues in the West | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning: Institutional Issues in the West Transmission Planning: Institutional Issues in the West Prepared for The CREPC Transmission Planning and Expansion Work Group by the...

33

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

Transmission Planning and Wind Energy. Issue Brief. August.of new transmission for wind energy due to the complex andincreasingly including wind energy in transmission plans. We

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

34

Transmission Planning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to...

35

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

B. Kirby. 2001. Transmission Planning for a Restructuringindustry_issues/energy_infrastructure/transmission/transmission_hirst.pdf Joskow, P.L. 2005a. “Transmission

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

36

Regional Planning | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Regional Planning Regional Planning Ocean Data Tools Technical Guide Map Gallery Regional Planning Feedback Ocean You are here Data.gov » Communities » Ocean Regional Planning Efforts Alias (field_alias) Apply California, Oregon, Washington Regional Ocean Partnership West Coast Governors' Alliance Regional Data Portal In Development U.S. Virgin Islands, Puerto Rico Regional Ocean Partnership U.S. Caribbean Regional Ocean Partnership-currently being formally established Regional Data Portal To be developed Georgia, Florida, North Carolina, South Carolina Regional Ocean Partnership Governors' South Atlantic Alliance Regional Data Portal Currently in development American Samoa, Commonwealth of the Northern Mariana Islands (CNMI), Federated States of Micronesia, Guam, Hawaii, Marshall Islands, Palau

37

Federal Register Notice: Plan for Conduct of 2012 Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice: Plan for Conduct of 2012 Electric Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study Federal Register Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study November 10, 2011 - 1:42pm Addthis The Department has issued a Federal Register Notice initiating preparations for development of the 2012 National Electric Transmission Congestion Study. The Department is seeking comments on what publicly-available data and information should be considered, and what types of analysis should be performed to identify and understand the significance and character of transmission congestion. DOE will host four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the study. Addthis Related Articles 2012 Congestion Study Workshops to be Held in December; Agendas Now

38

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Certificates of Need for Transmission Lines to Support theand Preference in Transmission Service. ” Washington, D.C. :Integrating Wind into Transmission Planning: The Rocky

Mills, Andrew D.

2009-01-01T23:59:59.000Z

39

Interconnection-Wide Transmission Planning Initiative - Meeting Calendars |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Development » Transmission Planning » Technology Development » Transmission Planning » Recovery Act Interconnection Transmission Planning » Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Click on the links below to access each awardee's meeting and events calendar. Eastern Interconnection Topic A Awardee: Eastern Interconnection Planning Collaborative Topic B Awardee: Eastern Interconnection States' Planning Council Western Interconnection Topic A Awardee: Western Electricity Coordinating Council Topic B Awardee: Western Governors' Association Texas Interconnection Topic A and B Awardee: Electric Reliability Council of Texas Electricity Advisory Committee Technology Development Transmission Planning

40

Interconnection-Wide Transmission Planning Initiative: Topic A,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the requirements for Topic A for all Interconnections under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning More Documents & Publications Microsoft Word - yDE-FOA-0000068.rtf Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

REGIONAL WATER SUPPLY PLANNING AND  

E-Print Network (OSTI)

accepted standards, which is an important planning aspect for water supply agencies. Yeh et al. (2000CHAPTER 3 REGIONAL WATER SUPPLY PLANNING AND CAPACITY EXPANSION MODELS Messele Z. Ejeta California Department of Water Resources Sacramento, California Larry W. Mays Department of Civil and Environmental

Mays, Larry W.

42

Interconnection-Wide Transmission Planning Initiative: Topic A,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A, A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the requirements for Topic A for all Interconnections under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning More Documents & Publications Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Microsoft Word - yDE-FOA-0000068.rtf Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning

43

Interconnection-Wide Transmission Planning Initiative: Topic B, State  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Agency Input Regarding Electric Resource and Transmission Planning in State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection A description of the requirements for Topic B for the Texas Interconnect under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the

44

Strategic and Flexible Transmission Planning: Balancing Reliability and Economics in Transmission Planning  

Science Conference Proceedings (OSTI)

Projects that improve reliability can also improve economics and vice versa. The challenge is in achieving the reliability goals with as much economic benefit as possible, that is, to balance the reliability and economic goals without compromising either. A method to balance the reliability and economic needs when planning transmission is outlined here with examples given for its usage.BackgroundThe goal of bulk power system planning is to ensure that ...

2013-08-30T23:59:59.000Z

45

DOE Action Plan Addressing the Electricity Transmission System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. DEPARTMENT OF ENERGY U.S. DEPARTMENT OF ENERGY ACTION PLAN ADDRESSING THE ELECTRICITY TRANSMISSION SYSTEM ~DRAFT~ DOE Action Plan Addressing the Electricity Transmission System 1 Table of Contents * INTRODUCTION ................................................................................................................... 2 The Grid Tech Team ...................................................................................................... 2 Focus on Transmission .................................................................................................. 3 Roadmap Goals ............................................................................................................. 4 * PROCESS OVERVIEW ........................................................................................................... 5

46

Biennial Assessment of the Fifth Power Plan Transmission Issues  

E-Print Network (OSTI)

unscheduled electricity flows over transmission lines leading to increased risks to electric system-construction alternatives to transmission; · Inability to effectively monitor the wholesale electricity market, identifyBiennial Assessment of the Fifth Power Plan Transmission Issues INTRODUCTION The Fifth Power Plan

47

The Electric Transmission Network: A Multi-Region Analysis  

U.S. Energy Information Administration (EIA)

Modeling and Analysis Papers>The Electric Transmission Network: A Multi-Region Analysis : The Electric Transmission Network: A Multi-Region Analysis

48

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Initiative: Topic B, Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Eastern Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

49

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Initiative: Topic B, Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Eastern Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation

50

Long-term Planning and Investment for Transmission and Generation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and generating capacity. Long-term Planning and Investment for Transmission and Generation More Documents & Publications 2012 Reliability & Markets Peer Review -...

51

WECC 10-Year Plan general presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bradley Nickell Director of Transmission Planning Regional Transmission Expansion Planning (RTEP) DOE EAC Meeting October 20, 2011 2 Regional Transmission Expansion Planning What...

52

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Transmission Vision for Wind Integration. White Paper.Planning (Xcel). 2006. Wind Integration Study Report OfCharles Smith (Utility Wind Integration Group), Lynn Coles (

Mills, Andrew D.

2009-01-01T23:59:59.000Z

53

Moving beyond paralysis: how states and regions are creating innovative transmission policies for renewable energy projects  

SciTech Connect

Experience from state and regional transmission siting initiatives aimed at expanding renewable energy development might offer lessons on how to circumvent traditional barriers to new transmission. Absent a national approach or federal transmission plan, these early models will provide a framework for increasing interstate cooperation. (author)

Schumacher, Allison; Fink, Sari; Porter, Kevin

2009-08-15T23:59:59.000Z

54

Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

Fink, S.; Rogers, J.; Porter, K.

2010-07-01T23:59:59.000Z

55

Central Wind Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities: Revised Edition  

DOE Green Energy (OSTI)

The report and accompanying table addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America. The first part of the table focuses on electric utilities and regional transmission organizations that have central wind power forecasting in place; the second part focuses on electric utilities and regional transmission organizations that plan to adopt central wind power forecasting in 2010. This is an update of the December 2009 report, NREL/SR-550-46763.

Rogers, J.; Porter, K.

2011-03-01T23:59:59.000Z

56

Region 9: Pacific Rim Region, Regional Sustainability Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REGION 9: PACIFIC RIM REGION REGION 9: PACIFIC RIM REGION Regional Sustainability Plan Presented by Ruth Cox Region 9 Regional Administrator Federal Utility Partnership Working Group (FUPWG) May 22 nd , 2013 REGION 9 INFORMATION MANAGE Federal space  36 million RSF in Region Nine * 173 owned buildings, 955 leased buildings * 100,000 Federal workers housed DESIGN & CONSTRUCT new Federal buildings $1.4 billion in FY12 capital construction projects $318 million in FY13 - Los Angeles Courthouse project PROVIDE PROCUREMENT LEADERSHIP across the Federal government  $1.24 billion in total GSA Schedule sales in FY12  $468 million to small businesses  34,000 fleet vehicles, 53% of which are Alternative Fuel Vehicles Pacific Rim Profile - CA, AZ, NV, HI

57

Transmission planning in deregulated power markets.  

E-Print Network (OSTI)

??Transmission systems in deregulated power systems have largely been left to centralized network operators although various forms of participation by merchant operators have been proposed.… (more)

Panambarage Anton Jagath Fonseka.

2008-01-01T23:59:59.000Z

58

Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cooperation Among States in the Western Interconnection on Electric Cooperation Among States in the Western Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning and Priorities A description of the requirements for Topic B for the Western Interconnection under the Interconnection-Wide Transmission Planning Initiative, part of the American Recovery and Reinvestment Act. The fundamental purpose of the awards under Topic B is to facilitate dialogue and collaboration among the states in the respective interconnections (or among state agencies, in the Texas Interconnection). Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western Interconnection on Electric Resource Planning

59

Generation and transmission expansion planning for renewable energy integration  

SciTech Connect

In recent years the expansion planning problem has become increasingly complex. As expansion planning (sometimes called composite or integrated resource planning) is a non-linear and non-convex optimization problem, researchers have traditionally focused on approximate models of power flows to solve the problem. The problem has also been split into generation expansion planning (GEP) and transmission network expansion planning (TNEP) to improve computational tractability. Until recently these approximations have produced results that are straight-forward to combine and adapt to the more complex and complete problem. However, the power grid is evolving towards a state where the adaptations are no longer easy (e.g. large amounts of limited control, renewable generation, comparable generation and transmission construction costs) and necessitates new approaches. Recent work on deterministic Discrepancy Bounded Local Search (DBLS) has shown it to be quite effective in addressing the TNEP. In this paper, we propose a generalization of DBLS to handle simultaneous generation and transmission planning.

Bent, Russell W [Los Alamos National Laboratory; Berscheid, Alan [Los Alamos National Laboratory; Toole, G. Loren [Los Alamos National Laboratory

2010-11-30T23:59:59.000Z

60

AC transmission system planning choosing lines from a discrete set  

E-Print Network (OSTI)

Transmission system planning (TSP) is a difficult nonlinear optimization problem involving non-convex quadratic terms, as well as discrete variables. We extend prior results for linear relaxations, drawing on a preliminary ...

Gilbertson, Eric W.

2013-04-24T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

Planning.pdf NWCC. 2007a. FERC Order 890: What Does It Meanof wholesale power competition. FERC Order 2000 providesISO/RTO are being pushed by FERC to expand the transmission

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

62

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

179c/179c9e0086c0.pdf National Wind CoordinatingTransmission Planning and Wind Energy. Issue Brief. August.and Renewable Energy, Wind & Hydropower Technologies Program

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

63

Transmission Expansion Planning Using an AC Model ...  

E-Print Network (OSTI)

This work is supported in part by the U.S. Department of Energy funded project denominated ... market process, electric utilities have gradually realized that a well-planned ..... close and provides key information about the original problem. For TEP ..... In steady state power system analysis, it is usually assumed that,. 0.95.

64

Transmission planning in the era of integrated resource planning: A survey of recent cases  

SciTech Connect

State action is critical to the expansion of the high-voltage transmission network, because regulated utilities must seek approval from utility commissions for proposals to site new lines. It is the purpose of this report to survey the regulatory treatment of issues that are unique to or ubiquitous in transmission planning and use. The authors review recent transmission siting cases to examine how the issues are presented to and resolved by state regulatory commissions and to provide a perspective for more general discussion of transmission policy. Their primary focus is on planning issues. Transmission capacity expansion is not typically treated in integrated resource planning. It is usually assumed that there is adequate transmission to achieve any particular plan. The authors believe that one important reason for this omission is the inherent complexity of transmission system expansion. Regulators and competitors may be at a serious disadvantage in negotiating or adjudicating specific transmission proposals with utilities, who generally have greater knowledge of both general technological considerations and case specifics. This problem of asymmetric information must be addressed at some level in planning or dispute resolution. However, they observe that explicit consideration of the information problem is absent from most regulatory and technical analysis of transmission. The goal of this survey is to share knowledge about the problems facing state regulators over the siting of new transmission facilities, and help to define constructive approaches to them.

Baldick, R.; Kahn, E.P.

1992-09-01T23:59:59.000Z

65

Ocean - Regional Planning Efforts | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Regional Planning Efforts Regional Planning Efforts Ocean Data Tools Technical Guide Map Gallery Regional Planning Feedback Ocean You are here Data.gov » Communities » Ocean Regional Planning Efforts Marine planning is a science-based process that provides transparent information about ocean use and guarantees the public and stakeholders a voice early on in decisions affecting the uses of the marine environment. It is an inclusive, bottom-up approach that gives the Federal Government, States, and Tribes, with input from local communities, stakeholders, and the public, the ability to make informed decisions on how best to optimize the use of and protect the ocean, coasts, and Great Lakes. Under the National Ocean Policy, the United States is subdivided into nine regional planning areas. Within each region, Federal, State, and Tribal

66

Recovery Act Interconnection Transmission Planning | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Act Interconnection Act Interconnection Transmission Planning Recovery Act Interconnection Transmission Planning View a Map of the Interconnections View a Map of the Interconnections Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. Pursuant to Title IV of the American Reinvestment and Recovery Act (2009), the Department of Energy's (DOE) Office of Electricity Delivery and Energy Reliability is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48

67

Public policy and private interests: why transmission planning and cost-allocation methods continue to stifle renewable energy policy goals  

SciTech Connect

It has been almost 10 years since FERC Order 2000 created regional transmission organizations and independent system operators in order to establish competitive power markets and to stimulate the development of new transmission. Now, the dominant behavior of the incumbent transmission owners, expressed through their RTO and ISO transmission expansion planning processes, is at loggerheads with public policies aimed at developing renewable energy resources. (author)

Puga, J. Nicolas; Lesser, Jonathan A.

2009-12-15T23:59:59.000Z

68

Electric Transmission Network: A Multi-Region Analysis, The  

Reports and Publications (EIA)

This paper examines the ability of the existing transmission network to respond efficiently to increased trade over four reliability regions in the northeastern United States.

Robert T. Eynon

2000-08-01T23:59:59.000Z

69

THE PUSH TOWARD GRID REGIONALIZATION IN OPEN ACCESS TRANSMISSION SYSTEMS  

E-Print Network (OSTI)

for the establishment of open access transmission in the US, while the Electricity Directive 96/92 of the European Union robust competition in wholesale electricity markets and mandate transmission-owning utilities to provideTHE PUSH TOWARD GRID REGIONALIZATION IN OPEN ACCESS TRANSMISSION SYSTEMS ProfessorGeorge Gross

Gross, George

70

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

conventional power and wind power make transmission more300 MW or more of new wind power and focus on the deeperthe trend toward wind power’s inclusion in regional

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

71

Coordinated dispatch of regional transmission organizations: Theory and example  

Science Conference Proceedings (OSTI)

In this paper we consider the coordination of economic dispatch across multiple Regional Transmission Organizations (RTOs) to optimize interchange levels, including consideration of the coordination of ''congestion relief'' as practiced in the Eastern ... Keywords: Congestion relief, Economic dispatch, Hierarchical optimization, Interchange optimization, Regional transmission organizations

Ross Baldick, Dhiman Chatterjee

2014-01-01T23:59:59.000Z

72

Policy on regional transmission organizations: Five pitfalls FERC must avoid  

SciTech Connect

In announcing in late November that it would explore what role it might play in developing regional transmission organizations, the Federal Energy Regulatory Commission (FERC) took the first step in a process that will be crucial to capturing maximum regional efficiency from the transmission grid. Ahead, though, lie many obstacles, a FERC commissioner warns.

Massey, W.L. [Federal Energy Regulatory Commission, Washington, DC (United States)

1999-03-01T23:59:59.000Z

73

CDKN-CARICOM-A Regional Implementation Plan for CARICOM's Regional  

Open Energy Info (EERE)

CARICOM-A Regional Implementation Plan for CARICOM's Regional CARICOM-A Regional Implementation Plan for CARICOM's Regional Climate Change Resilience Framework Jump to: navigation, search Name CDKN-CARICOM-A Regional Implementation Plan for CARICOM's Regional Climate Change Resilience Framework Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development Partner Caribbean Community Climate Change Centre (CCCCC), Caribbean Community Heads of State (CARICOM) Sector Climate, Energy, Land Topics Background analysis, Market analysis, Pathways analysis Website http://cdkn.org/project/planni Program Start 2010 Country Antigua and Barbuda, The Bahamas, Barbados, Belize, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saint Lucia, St. Kitts and Nevis, St. Vincent and the Grenadines, Suriname, Trinidad and Tobago

74

Regional State Committees Can Help Provide a Regional Perspective to Planning and Siting Decisions, Reducing the Need for Federal Preemption  

SciTech Connect

The Energy Policy Act of 2005 gave FERC the authority to preempt state and local transmission siting authorities under certain conditions, creating the potential for federal/state disputes. Such disputes are less likely to occur where there are open, regional planning processes. Multi-state advisory bodies known as regional state committees, working with RTOs, can provide a forum to evaluate transmission needs from a regional perspective, reducing the need for FERC involvement. (author)

Basheda, Gregory

2006-03-01T23:59:59.000Z

75

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

Science Conference Proceedings (OSTI)

The rapid development of wind power that the United States has experienced over the last several years has been coupled with a growing concern that wind development will require substantial additions to the nation's transmission infrastructure. Transmission is particularly important for wind power due to the locational dependence of wind resources, the relatively low capacity factor of wind plants, and the mismatch between the short lead time to build a new wind project and the longer lead time often needed to plan, permit, and construct transmission. It is clear that institutional issues related to transmission planning, siting, and cost allocation will pose major obstacles to accelerated wind power deployment, but also of concern is the potential cost of this infrastructure build out. Simply put, how much extra cost will society bear to deliver wind power to load centers? Without an answer to this question, there can be no consensus on whether or not the cost of developing transmission for wind will be a major barrier to further wind deployment, or whether the institutional barriers to transmission expansion are likely to be of more immediate concern. In this report, we review a sample of 40 detailed transmission studies that have included wind power. These studies cover a broad geographic area, and were completed from 2001-2008. Our primary goal in reviewing these studies is to develop a better understanding of the transmission costs needed to access growing quantities of wind generation. A secondary goal is to gain a better appreciation of the differences in transmission planning approaches in order to identify those methodologies that seem most able to estimate the incremental transmission costs associated with wind development. Finally, we hope that the resulting dataset and discussion might be used to inform the assumptions, methods, and results of higher-level assessment models that are sometimes used to estimate the cost of wind deployment (e.g. NEMS and WinDS). The authors and general location of the 40 detailed transmission studies included in our review are illustrated in Figure ES-1. As discussed in the body of the report, these studies vary considerably in scope, authorship, objectives, methodology, and tools. Though we recognize this diversity and are cognizant that comparisons among these studies are therefore somewhat inappropriate, we nonetheless emphasize such simple comparisons in this report. We do so in order to improve our understanding of the range of transmission costs needed to access greater quantities of wind, and to highlight some of the drivers of those costs. In so doing, we gloss over many important details and differences among the studies in our sample. In emphasizing simple comparisons, our analysis focuses primarily on the unit cost of transmission implied by each of the studies. The unit cost of transmission for wind in $/kW terms on a capacity-weighted basis is estimated by simply dividing the total transmission cost in a study by the total amount of incremental generation capacity (wind and non-wind) modeled in that study. In so doing, this metric assumes that within any individual study all incremental generation capacity imposes transmission costs in proportion to its nameplate capacity rating. The limitations to this approach are described in some detail in the body of the report.

Mills, Andrew D.; Wiser, Ryan; Porter, Kevin

2009-02-02T23:59:59.000Z

76

Comments in response to FERC rulemaking on regional transmission organizations  

E-Print Network (OSTI)

On May 13, 1999, the Federal Energy Regulatory Commission (FERC) issued a Notice of Proposed Rulemaking (NOPR) on Regional Transmission Organizations (RTO). The purpose of the NOPR is to solicit comments on proposed FERC ...

Joskow, Paul L.

1999-01-01T23:59:59.000Z

77

Moving Beyond Paralysis: How States and Regions Are Creating Innovative Transmission Projects; May 2009 - May 2010  

DOE Green Energy (OSTI)

This report profiles certain state and regional transmission policy initiatives aimed at promoting transmission development, mainly to access renewable resources.

Schumacher, A.; Fink, S.; Porter, K.

2009-10-01T23:59:59.000Z

78

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Certificates of Need for Transmission Lines to Support theMontana-Alberta Tie 230 kV Transmission Line: TransmissionNorthern California Transmission Line Project, Technical

Mills, Andrew D.

2009-01-01T23:59:59.000Z

79

Energy-water analysis of the 10-year WECC transmission planning study cases.  

DOE Green Energy (OSTI)

In 2011 the Department of Energy's Office of Electricity embarked on a comprehensive program to assist our Nation's three primary electric interconnections with long term transmission planning. Given the growing concern over water resources in the western U.S. the Western Electricity Coordinating Council (WECC) requested assistance with integrating water resource considerations into their broader electric transmission planning. The result is a project with three overarching objectives: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners in the Western Interconnection to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between the Western Electricity Coordinating Council (WECC), Western Governors Association (WGA), the Western States Water Council (WSWC) and their associated stakeholder teams. (3) Exercise the Energy-Water DSS to investigate water stress implications of the transmission planning scenarios put forward by WECC, WGA, and WSWC. The foundation for the Energy-Water DSS is Sandia National Laboratories Energy-Power-Water Simulation (EPWSim) model (Tidwell et al. 2009). The modeling framework targets the shared needs of energy and water producers, resource managers, regulators, and decision makers at the federal, state and local levels. This framework provides an interactive environment to explore trade-offs, and 'best' alternatives among a broad list of energy/water options and objectives. The decision support framework is formulated in a modular architecture, facilitating tailored analyses over different geographical regions and scales (e.g., state, county, watershed, interconnection). An interactive interface allows direct control of the model and access to real-time results displayed as charts, graphs and maps. The framework currently supports modules for calculating water withdrawal and consumption for current and planned electric power generation; projected water demand from competing use sectors; and, surface and groundwater availability. WECC's long range planning is organized according to two target planning horizons, a 10-year and a 20-year. This study supports WECC in the 10-year planning endeavor. In this case the water implications associated with four of WECC's alternative future study cases (described below) are calculated and reported. In future phases of planning we will work with WECC to craft study cases that aim to reduce the thermoelectric footprint of the interconnection and/or limit production in the most water stressed regions of the West.

Tidwell, Vincent Carroll; Passell, Howard David; Castillo, Cesar; Moreland, Barbara

2011-11-01T23:59:59.000Z

80

Regional Implementation Plan for CARICOM's Climate Change Resilience...  

Open Energy Info (EERE)

CDKN-CARICOM-Trinidad and Tobago-A Regional Implementation Plan for CARICOM's Regional Climate Change Resilience Framework) Jump to: navigation, search Name Regional...

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

low unit transmission costs, there were still numerous studies with high transmission voltages that had much higher unit costs than studies with transmission lines

Mills, Andrew D.

2009-01-01T23:59:59.000Z

82

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

such as major transmission lines or large generators, areto the nearest bulk transmission line is the only dedicatedon constrained transmission lines (or conversely, pay

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

83

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

transmission cost barrier for wind energy. A secondary goalfocus on the cost of transmission for wind energy does notincremental cost of transmission for wind energy implied by

Mills, Andrew D.

2009-01-01T23:59:59.000Z

84

Incorporating Variable Generation and Controllable Loads into Risk-Based Transmission Planning  

Science Conference Proceedings (OSTI)

As the penetration and size of renewable generation resources increase, transmission infrastructure must be expanded to accommodate increasing renewable resource output. Conventional transmission expansion planning requires sufficient transmission capacities to transfer the full name-plate capacity of all power plants at the same time to load centers. However, renewable resources, such as wind and solar, have highly variable output and are spatially diversified. Thus, transmission expansion planning with...

2010-12-31T23:59:59.000Z

85

Integrating Wind into Transmission Planning: The Rocky Mountain Area Transmission Study (RMATS): Preprint  

DOE Green Energy (OSTI)

Plans to expand the western grid are now underway. Bringing power from low-cost remote resources--including wind--to load centers could reduce costs for all consumers. But many paths appear to be already congested. Locational marginal price-based modeling is designed to identify the most cost-effective paths to be upgraded. The ranking of such paths is intended as the start of a process of political and regulatory approvals that are expected to result in the eventual construction of new and upgraded lines. This paper reviews the necessary data and analytical tasks to accurately represent wind in such modeling, and addresses some policy and regulatory issues that can help with wind integration into the grid. Providing wind fair access to the grid also (and more immediately) depends on tariff and regulatory changes. Expansion of the Rocky Mountain Area Transmission Study (RMATS) study scope to address operational issues supports the development of transmission solutions that enable wind to connect and deliver power in the next few years--much sooner than upgrades can be completed.

Hamilton, R.; Lehr, R.; Olsen, D.; Nielsen, J.; Acker, T.; Milligan, M.; Geller, H.

2004-03-01T23:59:59.000Z

86

Integrating transportation conservation with regional conservation planning  

E-Print Network (OSTI)

Multiple Species Conservation Program (MSCP). 1998.Final Multiple Species Conservation Program: MSCP Plan. Sanand Resource Conservation Planning Conservation Banking I

DiGregoria, John; Luciani, Emilie; Wynn, Susan

2005-01-01T23:59:59.000Z

87

Regional Transmission Organizations and Wind Energy: A Happy Marriage or Divorce Proceedings?; Preprint  

SciTech Connect

In 1996, the Federal Energy Regulatory Commission (FERC) issued Order 888, which required transmission-owning utilities under FERC jurisdiction to provide open access transmission service to eligible wholesale power customers. Among other things, the elements of electric service are unbundled, meaning that wind project developers must not only find a taker for the energy but also potentially make interconnection, ancillary service, and transmission arrangements for their wind projects. In 1999, the FERC issued Order 2000, which required transmission-owning utilities to file an intent with FERC on whether they have joined or plan to join a regional transmission organization (RTO). Order 2000 also required RTOs to meet certain criteria and be approved by FERC in order to begin operations as an RTO. More recently, FERC said it would issue a Notice of Proposed Rulemaking in 2002 on certain requirements and services, often termed''standard market design'' (SMD), that must be included in all transmission tariffs filed at FERC. This paper discusses the chronology of open access transmission issues, from Order 888 onward, and reviews some of the important issues raised by FERC's SMD initiative.

Parsons, B.; Porter, K.

2002-05-01T23:59:59.000Z

88

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

in calculating the unit cost of wind energy transmissionimpacts of the cost of transmission for wind energy. Only inj = Transmission cost per unit of wind energy weighted by

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

89

A Comparative Study of Metaheuristic Methods for Transmission Network Expansion Planning  

Science Conference Proceedings (OSTI)

Transmission network expansion planning is a very complex and computationally demanding problem due to the discrete nature of the optimization variables. This complexity has increased even more in a restructured deregulated environment. In this regard, ... Keywords: Bacteria Foraging, Genetic Algorithm, Metaheuristics, Particle Swarm Optimization, Transmission Expansion Planning

Ashu R. Verma; P. K. Bijwe; B. Panigrahi

2010-10-01T23:59:59.000Z

90

Randomized discrepancy bounded local search for transmission expansion planning  

SciTech Connect

In recent years the transmission network expansion planning problem (TNEP) has become increasingly complex. As the TNEP is a non-linear and non-convex optimization problem, researchers have traditionally focused on approximate models of power flows to solve the TNEP. Existing approaches are often tightly coupled to the approximation choice. Until recently these approximations have produced results that are straight-forward to adapt to the more complex (real) problem. However, the power grid is evolving towards a state where the adaptations are no longer easy (e.g. large amounts of limited control, renewable generation) and necessitates new approaches. Recent work on deterministic Discrepancy Bounded Local Search (DBLS) has shown it to be quite effective in addressing this question. DBLS encapsulates the complexity of power flow modeling in a black box that may be queried for information about the quality of proposed expansions. In this paper, we propose a randomization strategy that builds on DBLS and dramatically increases the computational efficiency of the algorithm.

Bent, Russell W [Los Alamos National Laboratory; Daniel, William B [Los Alamos National Laboratory

2010-11-23T23:59:59.000Z

91

A combination of heuristic and bacteria foraging-differential evolution algorithm for transmission network expansion planning with security constraints  

Science Conference Proceedings (OSTI)

Transmission network expansion planning (TNEP) is an important component of power system planning. Its task is to determine the optimal set of transmission lines to be constructed such that the cost of expansion plan is minimum and no network constraints ... Keywords: Transmission expansion planning, compensation approach, hybrid method

Ashu Verma; P. R. Bijwe; B. K. Panigrahi

2010-04-01T23:59:59.000Z

92

Haiti-Regional Implementation Plan for CARICOM's Climate Change  

Open Energy Info (EERE)

Haiti-Regional Implementation Plan for CARICOM's Climate Change Haiti-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Jump to: navigation, search Name Haiti-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development, Caribbean Community Climate Change Centre (CCCCC) Partner Caribbean Community Climate Change Centre (CCCCC), Caribbean Community Heads of State (CARICOM) Sector Climate, Energy, Land Topics Adaptation, Background analysis, Low emission development planning, -LEDS, Market analysis, Pathways analysis Program Start 2009 Program End 2015 Country Haiti Caribbean References CDKN-CARICOM-A Regional Implementation Plan for CARICOM's Regional Climate Change Resilience Framework[1]

93

Montserrat-Regional Implementation Plan for CARICOM's Climate Change  

Open Energy Info (EERE)

Montserrat-Regional Implementation Plan for CARICOM's Climate Change Montserrat-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Jump to: navigation, search Name Montserrat-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development, Caribbean Community Climate Change Centre (CCCCC) Partner Caribbean Community Climate Change Centre (CCCCC), Caribbean Community Heads of State (CARICOM) Sector Climate, Energy, Land Topics Adaptation, Background analysis, Low emission development planning, -LEDS, Market analysis, Pathways analysis Program Start 2009 Program End 2015 Country Montserrat Caribbean References CDKN-CARICOM-A Regional Implementation Plan for CARICOM's Regional Climate Change Resilience Framework[1]

94

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

at: http://www.ftloutreach.com Xcel Energy, TransmissionCBED CapX Utilities Midwest Xcel Energy Voluntary UtilityElectric Transmission Study Xcel-31A Southwest Power Pool (

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

95

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

SEC). 2008. Form 10-K: Xcel Energy Inc. http://www.sec.gov/cost of transmission proposed in Xcel Energy 2001). SouthernApril. http://www.ftloutreach.com Xcel Energy Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

96

Transmission Rights-of-Way Vegetation Management Plan Framework  

Science Conference Proceedings (OSTI)

The North American Electric Reliability Corporation (NERC) FAC-003-1 standards for vegetation management on electric transmission line rights-of-way (ROWs) have been in place since April 2006. These mandatory standards regulate electric transmission line vegetation management across the United States, and are narrowly focused on minimizing vegetation caused outages in electricity transmission. The NERC FAC-003-1 standards are potentially broadened by the voluntary American National Standards Institute (A...

2008-08-05T23:59:59.000Z

97

Microsoft Word - DOE RFI on Transmission Planning - PGE Comments...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

delivery of power from multiple resource areas in California. PG&E believes that greater transmission availability enables competitive markets by providing procurement options in...

98

Central Wind Power Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities  

DOE Green Energy (OSTI)

The report addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America.

Porter, K.; Rogers, J.

2009-12-01T23:59:59.000Z

99

Regional Implementation Plan for CARICOM's Climate Change Resilience...  

Open Energy Info (EERE)

Jump to: navigation, search Name Regional Implementation Plan for CARICOM's Climate Change Resilience Framework AgencyCompany Organization Climate and Development Knowledge...

100

Transmission Planning Process and Opportunities for Utility-Scale...  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Process and Opportunities for Utility-Scale Solar Engagement within the Western Electricity Coordinating Council (WECC) Introduction Market barriers unrelated to...

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Estimates of Congestion Costs. The Electricity Journal 17,Incremental Transmission Costs Due to Wind Power. Rockville,and Intermittency Really Cost? Supply Curves for Electricity

Mills, Andrew D.

2009-01-01T23:59:59.000Z

102

Saint Vincent and the Grenadines-Regional Implementation Plan for  

Open Energy Info (EERE)

Saint Vincent and the Grenadines-Regional Implementation Plan for Saint Vincent and the Grenadines-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Jump to: navigation, search Name Saint Vincent and the Grenadines-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development, Caribbean Community Climate Change Centre (CCCCC) Partner Caribbean Community Climate Change Centre (CCCCC), Caribbean Community Heads of State (CARICOM) Sector Climate, Energy, Land Topics Adaptation, Background analysis, Low emission development planning, -LEDS, Market analysis, Pathways analysis Website http://cdkn.org/project/planni Program Start 2009 Program End 2015

103

Antigua and Barbuda-Regional Implementation Plan for CARICOM's Climate  

Open Energy Info (EERE)

Antigua and Barbuda-Regional Implementation Plan for CARICOM's Climate Antigua and Barbuda-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Jump to: navigation, search Name Antigua and Barbuda-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development, Caribbean Community Climate Change Centre (CCCCC) Partner Caribbean Community Climate Change Centre (CCCCC), Caribbean Community Heads of State (CARICOM) Sector Climate, Energy, Land Focus Area Renewable Energy, Non-renewable Energy, Agriculture, Economic Development, Food Supply, Forestry, Water Conservation Topics Adaptation, Background analysis, - Health, Low emission development planning, -LEDS, Market analysis, Pathways analysis

104

Trinidad and Tobago-Regional Implementation Plan for CARICOM's Climate  

Open Energy Info (EERE)

Trinidad and Tobago-Regional Implementation Plan for CARICOM's Climate Trinidad and Tobago-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Jump to: navigation, search Name Trinidad and Tobago-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development, Caribbean Community Climate Change Centre (CCCCC) Partner Caribbean Community Climate Change Centre (CCCCC), Caribbean Community Heads of State (CARICOM) Sector Climate, Energy, Land Topics Adaptation, Background analysis, Low emission development planning, -LEDS, Market analysis, Pathways analysis Website http://cdkn.org/project/planni Program Start 2009 Program End 2015 Country Trinidad and Tobago

105

Implications of Regional Transmission Organization Design for Renewable Energy Technologies  

DOE Green Energy (OSTI)

This report summarizes the development of Regional Transmission Organizations (RTOs) and assesses the potential implications of market rules for renewable energy technologies. The report focuses on scheduling provisions, as these have proved problematic in some cases for intermittent renewable energy technologies. Market rules of four RTOs-the Pennsylvania-Maryland-New Jersey ISO, the ERCOT ISO, the Midwest ISO and the New York ISO (NYISO)-were examined to determine the impact on intermittent renewable energy projects such as wind energy generators. Also, a more general look was taken at how biomass power may fare in RTOs, specifically whether these technologies can participate in ancillary service markets. Lastly, an assessment was made regarding the implications for renewable energy technologies of a Northeast-wide RTO that would combine the three existing Northeast ISOs (the aforementioned PJM and NYISOs, as well as ISO New England).

Porter, K.

2002-05-01T23:59:59.000Z

106

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

factor of individual wind farms leads to concerns thatplants. The location of wind farms is dependent on the winda lower-performing wind farm than to build new transmission

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

107

Jamaica-Regional Implementation Plan for CARICOM's Climate Change  

Open Energy Info (EERE)

Jamaica-Regional Implementation Plan for CARICOM's Climate Change Jamaica-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Jump to: navigation, search Name Jamaica-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development, Caribbean Community Climate Change Centre (CCCCC) Partner Caribbean Community Climate Change Centre (CCCCC), Caribbean Community Heads of State (CARICOM) Sector Climate, Energy, Land Topics Adaptation, Background analysis, Low emission development planning, -LEDS, Market analysis, Pathways analysis Website http://cdkn.org/project/planni Program Start 2009 Program End 2015 Country Jamaica Caribbean References CDKN-CARICOM-A Regional Implementation Plan for CARICOM's Regional Climate Change Resilience Framework[1]

108

Guyana-Regional Implementation Plan for CARICOM's Climate Change  

Open Energy Info (EERE)

Guyana-Regional Implementation Plan for CARICOM's Climate Change Guyana-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Jump to: navigation, search Name Guyana-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development, Caribbean Community Climate Change Centre (CCCCC) Partner Caribbean Community Climate Change Centre (CCCCC), Caribbean Community Heads of State (CARICOM) Sector Climate, Energy, Land Topics Adaptation, Background analysis, Low emission development planning, -LEDS, Market analysis, Pathways analysis Website http://cdkn.org/project/planni Program Start 2009 Program End 2015 Country Guyana South America References CDKN-CARICOM-A Regional Implementation Plan for CARICOM's Regional Climate Change Resilience Framework[1]

109

Bahamas-Regional Implementation Plan for CARICOM's Climate Change  

Open Energy Info (EERE)

Bahamas-Regional Implementation Plan for CARICOM's Climate Change Bahamas-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Jump to: navigation, search Name Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development, Caribbean Community Climate Change Centre (CCCCC) Partner Caribbean Community Climate Change Centre (CCCCC), Caribbean Community Heads of State (CARICOM) Sector Climate, Energy, Land Topics Adaptation, Background analysis, Low emission development planning, Market analysis, Pathways analysis Website http://cdkn.org/project/planni Program Start 2009 Program End 2015 Country Bahamas Caribbean References CDKN-CARICOM-A Regional Implementation Plan for CARICOM's Regional Climate Change Resilience Framework[1]

110

Grenada-Regional Implementation Plan for CARICOM's Climate Change  

Open Energy Info (EERE)

Grenada-Regional Implementation Plan for CARICOM's Climate Change Grenada-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Jump to: navigation, search Name Grenada-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development, Caribbean Community Climate Change Centre (CCCCC) Partner Caribbean Community Climate Change Centre (CCCCC), Caribbean Community Heads of State (CARICOM) Sector Climate, Energy, Land Topics Adaptation, Background analysis, Low emission development planning, -LEDS, Market analysis, Pathways analysis Website http://cdkn.org/project/planni Program Start 2009 Program End 2015 Country Grenada Caribbean References CDKN-CARICOM-A Regional Implementation Plan for CARICOM's Regional Climate Change Resilience Framework[1]

111

Barbados-Regional Implementation Plan for CARICOM's Climate Change  

Open Energy Info (EERE)

Barbados-Regional Implementation Plan for CARICOM's Climate Change Barbados-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Jump to: navigation, search Name Barbados-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development, Caribbean Community Climate Change Centre (CCCCC) Partner Caribbean Community Climate Change Centre (CCCCC), Caribbean Community Heads of State (CARICOM) Sector Climate, Energy, Land Topics Adaptation, Background analysis, Low emission development planning, -LEDS, Market analysis, Pathways analysis Website http://cdkn.org/project/planni Program Start 2009 Program End 2015 Country Barbados Caribbean References CDKN-CARICOM-A Regional Implementation Plan for CARICOM's Regional Climate Change Resilience Framework[1]

112

Suriname-Regional Implementation Plan for CARICOM's Climate Change  

Open Energy Info (EERE)

Suriname-Regional Implementation Plan for CARICOM's Climate Change Suriname-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Jump to: navigation, search Name Suriname-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development, Caribbean Community Climate Change Centre (CCCCC) Partner Caribbean Community Climate Change Centre (CCCCC), Caribbean Community Heads of State (CARICOM) Sector Climate, Energy, Land Topics Adaptation, Background analysis, Low emission development planning, -LEDS, Market analysis, Pathways analysis Website http://cdkn.org/project/planni Program Start 2009 Program End 2015 Country Suriname South America References CDKN-CARICOM-A Regional Implementation Plan for CARICOM's Regional Climate Change Resilience Framework[1]

113

Dominica-Regional Implementation Plan for CARICOM's Climate Change  

Open Energy Info (EERE)

Dominica-Regional Implementation Plan for CARICOM's Climate Change Dominica-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Jump to: navigation, search Name Dominica--Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development, Caribbean Community Climate Change Centre (CCCCC) Partner Caribbean Community Climate Change Centre (CCCCC), Caribbean Community Heads of State (CARICOM) Sector Climate, Energy, Land Topics Adaptation, Background analysis, Low emission development planning, -LEDS, Market analysis, Pathways analysis Website http://cdkn.org/project/planni Program Start 2009 Program End 2015 Country Dominica Caribbean References CDKN-CARICOM-A Regional Implementation Plan for CARICOM's Regional Climate Change Resilience Framework[1]

114

Area development plan of the geothermal potential in planning region 8, Roosevelt - Custer area  

DOE Green Energy (OSTI)

Geothermal resource data, the Roosevelt-Custer Region development plan, and energy, economic, and institutional considerations are presented. Environmental considerations and water availability are discussed. (MHR)

Not Available

1980-07-01T23:59:59.000Z

115

Northwestern Indiana Regional Planning Commission (Indiana) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northwestern Indiana Regional Planning Commission (Indiana) Northwestern Indiana Regional Planning Commission (Indiana) Northwestern Indiana Regional Planning Commission (Indiana) < Back Eligibility State/Provincial Govt Industrial Construction Local Government Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Indiana Program Type Siting and Permitting Provider Northwestern Indiana Regional Planning Commission NIRPC is a regional council of local governments serving the citizens of Lake, Porter, and LaPorte counties in Northwest Indiana. NIRPC provides a forum that enables the citizens of Northwest Indiana to address regional issues relating to transportation, the environment and community, and economic development. NIRPC, as a recipient of federal funds, is subject to

116

1394 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 22, NO. 4, NOVEMBER 2007 Economic Criteria for Planning Transmission  

E-Print Network (OSTI)

for Planning Transmission Investment in Restructured Electricity Markets Enzo E. Sauma, Member, IEEE. In reality, however, since the impacts of an electricity transmission project on different players may vary that should be considered when planning electricity transmission investments. We propose an electricity

Oren, Shmuel S.

117

NREL: Energy Analysis: Transmission Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

118

Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.  

SciTech Connect

The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

119

Abstract--This paper proposes an optimization based method of planning reactive power control for electric transmission  

E-Print Network (OSTI)

for electric transmission systems to endow them with the capability of being reconfigured to a secure of the electric transmission system. There are three basic options for strengthening transmission systems: (1-term planning to strengthen transmission capability is necessary to increase future reliability levels

Kumar, Ratnesh

120

Microsoft PowerPoint - FY12 RMR - CRSP TRANSMISSION PLANNING MEETING_Final.PPT [Compatibility Mode]  

NLE Websites -- All DOE Office Websites (Extended Search)

TRANSMISSION TRANSMISSION PLANNING MEETING PLANNING MEETING December 6, 2011 December 6, 2011 1 Agenda g Introductions CRSP North (Loveland) Program CRSP South (Phoenix) Program CRSP South (Phoenix) Program Open Forum 2 CRSP North (Loveland) ( ) Capital Program Transmission Lines Substations Communications Communications Control, Protection and Metering M bil & H E i t Mobile & Heavy Equipment Programmatic Improvements 3 Transmission Lines Line Equipment Replacements 50k in FY12 & every year after Pleasant View 24.9-kV Line Replacement Estimated Project Cost (EPC) $ 1,000k FY15 $200K FY16 $800K 4 Substations Annual Equipment Replacement Program Substation Test Equipment Combined all test equipment categories under movable property, "Test Equipment Replacements"

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

500 and 230 kV 765 kV and 800 kV HVDC 500 and 230 kV 500 kVmi) 138 and 345 kV 345 kV 345 kV 345 kV and HVDC 345kV and HVDC 345 kV 345 kV Note: Total transmission cost is

Mills, Andrew D.

2009-01-01T23:59:59.000Z

122

Prepared for: REGION C WATER PLANNING GROUP Prepared by:  

E-Print Network (OSTI)

This model water conservation plan was prepared by Freese and Nichols, Alan Plummer Associates, and Chiang, Patel, and Yerby for the Region C Water Planning Group. It is intended as a template for manufacturers within Region C as they develop their own water conservation plans. Manufacturers should customize the details to match their unique situation. The model plan was prepared pursuant to Texas Commission on Environmental Quality rules. The rules do not require a drought contingency plan for manufacturers. The other Region C model water conservation plans (for municipal, steam electric power, and irrigation users) include example text for a fictional water user that can be edited to match a real-life situation. However, there are a large number of manufacturers in Region C with widely varying processes and water uses, and it is difficult to generate example text that is applicable to most manufacturers. This template provides a plan structure and instructions for the type of content that belongs in each section. The water conservation plans for the City of Fort Worth 1, the City of Dallas 2, New Mexico Office of the State Engineer (Guide for Commercial, Institutional, and Industrial Users) 3 were used

Brian K. Mcdonald; Alan Plummer Associates; Thomas C. Gooch; Stephanie W. Griffin; Alan Plummer Associates

2005-01-01T23:59:59.000Z

123

OPTIMIZING TRANSMISSION SERVICE COST OF KHUZESTAN REGIONAL GRID BASED ON NSGA?II ALGORITHM  

Science Conference Proceedings (OSTI)

Any plan for modeling the components of transmission service costs should be able to consider congestion as well as loss cost. Assessing the real value of congestion and loss costs in each network has a substantial contribution to analyze the grid’s weaknesses in order to release capacity of power network. As much as the amount of congestion and loss costs in the transmission grid reduces the amount of power passing through transmission lines increases. Therefore

Alireza Tavakoli Shooshtari; Mahmood Joorabian; Armin Ebrahimi Milani; Arash Gholamzadeh

2011-01-01T23:59:59.000Z

124

Saint Lucia-Regional Implementation Plan for CARICOM's Climate Change  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Saint Lucia-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Jump to: navigation, search Name Saint Lucia-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development, Caribbean Community Climate Change Centre (CCCCC) Partner Caribbean Community Climate Change Centre (CCCCC), Caribbean Community Heads of State (CARICOM) Sector Climate, Energy, Land Topics Adaptation, Background analysis, Low emission development planning, -LEDS, Market analysis, Pathways analysis Website http://cdkn.org/project/planni Program Start 2009

125

Particle swarm optimization based on model space theory and its application on transmission network planning  

Science Conference Proceedings (OSTI)

A model space and space compression theory is developed. The theory defined an N-1 security network as a model, and then defined a model space according a given model. Using this theory in Particle Swarm Optimization can prevent particles form searching ... Keywords: model, model space, model structure mutation, particle swarm optimization, transmission network expansion planning

Yi-Xiong Jin; Juan Su

2007-04-01T23:59:59.000Z

126

Microsoft Word - DOE RFI on Transmission Planning - PGE Comments.DOC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments of Pacific Gas & Electric Company Comments of Pacific Gas & Electric Company Department of Energy Request for Information on Transmission Permitting [OE Docket No. RRTT-IR-001] Pacific Gas & Electric Company (PG&E) appreciates the opportunity to respond to the questions from the Department of Energy (DOE) in its Request for Information (RFI) related to the permitting of transmission lines. The RFI lists six (6) questions, several of them with subparts. PG&E responds to the questions sequentially as they are listed in the RFI. As discussed in more detail below, increased alignment across the federal, state and local agencies for permitting and improved planning coordination would improve the development time for transmission and generation. Improved focus on planning would result in a more

127

Regional Implementation Plan for CARICOM's Climate Change Resilience  

Open Energy Info (EERE)

(Redirected from CDKN-CARICOM-Trinidad and Tobago-A Regional Implementation (Redirected from CDKN-CARICOM-Trinidad and Tobago-A Regional Implementation Plan for CARICOM's Regional Climate Change Resilience Framework) Jump to: navigation, search Name Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development, Caribbean Community Climate Change Centre (CCCCC) Partner Caribbean Community Climate Change Centre (CCCCC), Caribbean Community Heads of State (CARICOM) Sector Climate, Energy, Land Topics Background analysis, Low emission development planning, Market analysis, Pathways analysis Website http://cdkn.org/project/planni Program Start 2009 Program End 2015 Country Antigua and Barbuda, Bahamas, Barbados, Belize, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saint Lucia, Saint Vincent and the Grenadines, St. Kitts and Nevis, Suriname, Trinidad and Tobago

128

Abstract-Electricity transmission planning does not have a common solution worldwide, with most countries trusting on  

E-Print Network (OSTI)

Abstract- Electricity transmission planning does not have a common solution worldwide, with most issue in the restructuring of the electricity market all over the world. Transmission systems costs to the original 1982 regulatory framework, being transmission pricing and investment among the main issues

Rudnick, Hugh

129

California/Transmission | Open Energy Information  

Open Energy Info (EERE)

California/Transmission California/Transmission < California Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in California is part of the WestConnect Transmission Planning area and the California Transmission Planning Group. The desert southwest region of California belongs to the Southwest Area Transmission power grid and the northern region of the state belongs to the Sierra Subregional Planning Group. The SWAT provides the technical forum required to complete reliability assessments, develop joint business opportunities and accomplish

130

Transmission Planning Process and Opportunities for Utility-Scale Solar Engagement within the Western Electricity Coordinating Council (WECC)  

DOE Green Energy (OSTI)

This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. Market barriers unrelated to technology often limit the expansion of utility-scale solar power, even in areas with exceptional resource potential. Many of these non-technical barriers have to do with policy, regulation, and planning, and hardly ever do they resolve themselves in a timely fashion. In most cases, pre-emptive intervention by interested stakeholders is the easiest way to remove/address such barriers, but it requires knowing how to navigate the institutional waters of the relevant agencies and boards. This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. It focuses on the Western Interconnection (WI), primarily because the quality of solar resources in the Southwest makes utility-scale concentrating solar power (CSP) and photovoltaics (PV) economically feasible, and because the relevant institutions have evolved in a way that has opened up opportunities for removing non-technical market barriers. Developers will find in this report a high-level field manual to identify the venues for mitigating and possibly eliminating systemic market obstacles and ensuring that the economic playing field is reasonably level. Project-specific issues such as siting for transmission and generation resources are beyond the scope of this report. Instead, the aim is to examine issues that pervasively affect all utility-scale PV and CSP in the region regardless of where the project may be. While the focus is on the WI, many of the institutions described here also have their counterparts in the Eastern and the Texas interconnections. Specifically, this report suggests a number of critical engagement points relating to generation and transmission planning.

Hein, J.; Hurlbut, D.; Milligan, M.; Coles, L.; Green, B.

2011-11-01T23:59:59.000Z

131

Regional Implementation Plan for CARICOM's Climate Change Resilience  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search Name Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development, Caribbean Community Climate Change Centre (CCCCC) Partner Caribbean Community Climate Change Centre (CCCCC), Caribbean Community Heads of State (CARICOM) Sector Climate, Energy, Land Topics Background analysis, Low emission development planning, Market analysis, Pathways analysis Website http://cdkn.org/project/planni Program Start 2009 Program End 2015 Country Antigua and Barbuda, Bahamas, Barbados, Belize, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saint Lucia, Saint Vincent and the Grenadines, St. Kitts and Nevis, Suriname, Trinidad and Tobago

132

Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems  

Science Conference Proceedings (OSTI)

This report introduces a new capacity expansion model, the Resource Planning Model (RPM), with high spatial and temporal resolution that can be used for mid- and long-term scenario planning of regional power systems. Although RPM can be adapted to any geographic region, the report describes an initial version of the model adapted for the power system in Colorado. It presents examples of scenario results from the first version of the model, including an example of a 30%-by-2020 renewable electricity penetration scenario.

Mai, T.; Drury, E.; Eurek, K.; Bodington, N.; Lopez, A.; Perry, A.

2013-01-01T23:59:59.000Z

133

Spectra of Reciprocal Transmission: Generalization to Saturated Regions  

Science Conference Proceedings (OSTI)

The results of Munk et al. (1981), relating spectra of ocean sound-speed and water-particle velocity to observable acoustic spectra are applicable only in the geometrical optics region. It is shown that analogous formulas that are valid in the ...

Stanley M. Flatté

1981-04-01T23:59:59.000Z

134

California's electricity system of the future scenario analysis in support of public-interest transmission system R&D planning  

E-Print Network (OSTI)

role for industry-led R&D activities. Note that thisAnalysis for PIER Transmission R&D Planning The highestfor public-interest R&D – i.e. , those that emerge as

Eto, Joseph; Stovall, John P.

2003-01-01T23:59:59.000Z

135

The Missouri Basin region's water quality planning strategy. Planning dossier. Second edition  

SciTech Connect

The Missouri Basin Region area includes the watersheds of the Missouri River and the Souris, Red River of the North, and Rainy Rivers. This area comprises all of Nebraska and North Dakota; the majority of Montana, Wyoming, South Dakota, Kansas, and Missouri; and lesser portions of Colorado, Minnesota, and Iowa. The report describes objectives, evaluation, costs, work schedule, and planning needs. (GRA)

1970-06-01T23:59:59.000Z

136

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn and Carbon Counties, Montana and Big Horn County, Wyoming MITIGATION ACTION IDENTIFIER RESPONSIBLE PARTY FOR IMPLEMENTING MITIGATION ACTION LOCATION IF AVAILABLE/ STRUCTURE NUMBERS PARTY RESPONSIBLE FOR MONITORING AND ENSURING COMPLIANCE 1 Construction Contractor Western Maintenance Standard Construction Project Practices will be implemented through Phases I of Project construction and operation (Table 2.1-3 in the Final EA.) Western Construction (during Construction Phase) Western Maintenance (During maintenance of facility) NPS - WESTERN INTERAGENCY AGREEMENT FOR BIGHORN CANYON NRA 2 NPS, Western The Interagency Agreement between United

137

Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

138

Improving Electricity Resource-Planning Processes by Considering the Strategic Benefits of Transmission  

E-Print Network (OSTI)

benefits from the proposed transmission project c. Modifyingover time from the new transmission uses e. Assessing otherthe Strategic Benefits of Transmission Vikram Budhraja, Fred

Budhraja, Vikram

2010-01-01T23:59:59.000Z

139

RTSTEP regional transportation simulation tool for emergency planning - final report.  

Science Conference Proceedings (OSTI)

Large-scale evacuations from major cities during no-notice events - such as chemical or radiological attacks, hazardous material spills, or earthquakes - have an obvious impact on large regions rather than on just the directly affected area. The scope of impact includes the accommodation of emergency evacuation traffic throughout a very large area; the planning of resources to respond appropriately to the needs of the affected population; the placement of medical supplies and decontamination equipment; and the assessment and determination of primary escape routes, as well as routes for incoming emergency responders. Compared to events with advance notice, such as evacuations based on hurricanes approaching an affected area, the response to no-notice events relies exclusively on pre-planning and general regional emergency preparedness. Another unique issue is the lack of a full and immediate understanding of the underlying threats to the population, making it even more essential to gain extensive knowledge of the available resources, the chain of command, and established procedures. Given the size of the area affected, an advanced understanding of the regional transportation systems is essential to help with the planning for such events. The objectives of the work described here (carried out by Argonne National Laboratory) is the development of a multi-modal regional transportation model that allows for the analysis of different evacuation scenarios and emergency response strategies to build a wealth of knowledge that can be used to develop appropriate regional emergency response plans. The focus of this work is on the effects of no-notice evacuations on the regional transportation network, as well as the response of the transportation network to the sudden and unusual demand. The effects are dynamic in nature, with scenarios changing potentially from minute to minute. The response to a radiological or chemical hazard will be based on the time-delayed dispersion of such materials over a large area, with responders trying to mitigate the immediate danger to the population in a variety of ways that may change over time (e.g., in-place evacuation, staged evacuations, and declarations of growing evacuation zones over time). In addition, available resources will be marshaled in unusual ways, such as the repurposing of transit vehicles to support mass evacuations. Thus, any simulation strategy will need to be able to address highly dynamic effects and will need to be able to handle any mode of ground transportation. Depending on the urgency and timeline of the event, emergency responders may also direct evacuees to leave largely on foot, keeping roadways as clear as possible for emergency responders, logistics, mass transport, and law enforcement. This RTSTEP project developed a regional emergency evacuation modeling tool for the Chicago Metropolitan Area that emergency responders can use to pre-plan evacuation strategies and compare different response strategies on the basis of a rather realistic model of the underlying complex transportation system. This approach is a significant improvement over existing response strategies that are largely based on experience gained from small-scale events, anecdotal evidence, and extrapolation to the scale of the assumed emergency. The new tool will thus add to the toolbox available to emergency response planners to help them design appropriate generalized procedures and strategies that lead to an improved outcome when used during an actual event.

Ley, H.; Sokolov, V.; Hope, M.; Auld, J.; Zhang, K.; Park, Y.; Kang, X. (Energy Systems)

2012-01-20T23:59:59.000Z

140

Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Bulk Electric Power Systems: Bulk Electric Power Systems: Operations and Transmission Planning Volume 4 of 4 Volume 2 PDF Volume 3 PDF Volume 1 PDF Volume 4 PDF NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Renewable Electricity Futures Study Edited By Hand, M.M. National Renewable Energy Laboratory Baldwin, S. U.S. Department of Energy DeMeo, E. Renewable Energy Consulting Services, Inc. Reilly, J.M. Massachusetts Institute of Technology Mai, T. National Renewable Energy Laboratory Arent, D. Joint Institute for Strategic Energy Analysis Porro, G. National Renewable Energy Laboratory Meshek, M. National Renewable Energy Laboratory Sandor, D. National Renewable

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Neighborhood, City, or Region: Deconstructing Scale in Planning Frames  

E-Print Network (OSTI)

pdf -----. 2004. Transportation 2030 Equity Analysis Report.generation: Transportation 2030 plan for the San Franciscoplanning organization’s 2030 plan (MTC 2005) frames

Lowe, Kate

2011-01-01T23:59:59.000Z

142

Feasible Offset Region Based Tool Path Planning for Face Milling  

E-Print Network (OSTI)

Path Planning for Face Milling, Masters Report, UniversityPath Planning for Face Milling Prabhu Ramachandran Sponsoredburr formation while face milling powertrain components in

Ramachandran, Prabhu; Dornfeld, David A

2003-01-01T23:59:59.000Z

143

Transportation Emergency Preparedness Program Plan, U.S. Department of Energy Region 6  

Science Conference Proceedings (OSTI)

The United States Department of Energy (DOE) Region 6 Transportation Emergency Preparedness Program Plan (TEPP Plan) operates within the framework of the DOE emergency management system for developing, coordinating, and directing emergency planning, preparedness, and readiness assurance activities for radiological transportation incidents. The DOE Region 6 TEPP Plan is a narrative description of the DOE Transportation Emergency Preparedness Program activities, training and technical assistance provided to states and tribes along DOE's transportation corridors in DOE Region 6.

Marsha Keister

2010-04-01T23:59:59.000Z

144

Audit Report - Department of Energy's Interconnection Transmission Planning Program Funded through the American Recovery and Reinvestment Act of 2009  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Report Department of Energy's Interconnection Transmission Planning Program Funded through the American Recovery and Reinvestment Act of 2009 OAS-RA-13-26 June 2013 Department of Energy Washington, DC 20585 June 19, 2013 MEMORANDUM FOR THE ASSISTANT SECRETARY FOR ELECTRICITY DELIVERY AND ENERGY RELIABILITY FROM: Rickey R. Hass Deputy Inspector General for Audit and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's Interconnection Transmission Planning Program Funded through the American Recovery and Reinvestment Act of 2009" BACKGROUND Under the American Recovery and Reinvestment Act of 2009 (Recovery Act), the Department of

145

Improving Electricity Resource-Planning Processes by Considering the Strategic Benefits of Transmission  

E-Print Network (OSTI)

Tehachapi wind and transmission line development, the 4.8-cost of the Tehachapi transmission line is estimated to be $14% of the cost of the transmission line. While it can be

Budhraja, Vikram

2010-01-01T23:59:59.000Z

146

Plans and Project in the Upper Great Plains Region  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Projects Studies WindHydro Integration Feasibility Study Dakotas Wind Study Summary (144kb pdf) For more information, contact Dirk Shulund by email or by phone at...

147

Planning for a regional rail system : analysis of high speed and high quality rail in the Basque region  

E-Print Network (OSTI)

The goal of this thesis is to provide guidance for regional rail network planning to achieve the maximum benefits in terms of economic growth, passenger satisfaction, and environmental sustainability. The hypothesis is ...

Lewis, Paul R. S. (Paul Robinson S.)

2011-01-01T23:59:59.000Z

148

Flexible gas insulated transmission line having regions of reduced electric field  

DOE Patents (OSTI)

A gas insulated transmission line having radially flexible field control means for reducing the electric field along the periphery of the inner conductor at predetermined locations wherein the support insulators are located. The radially flexible field control means of the invention includes several structural variations of the inner conductor, wherein careful controlling of the length to depth of surface depressions produces regions of reduced electric field. Several embodiments of the invention dispose a flexible connector at the predetermined location along the inner conductor where the surface depressions that control the reduced electric field are located.

Cookson, Alan H. (Pittsburgh, PA); Fischer, William H. (Wilkins Township, Allegheny County, PA); Yoon, Kue H. (Pittsburgh, PA); Meyer, Jeffry R. (Penn Hills Township, Allegheny County, PA)

1983-01-01T23:59:59.000Z

149

Scoping Study for Identifying the Need for New Tools for the Planning of Transmission and Distribution Systems  

Science Conference Proceedings (OSTI)

This scoping study was performed for the Intelligrid program and presents a qualitative analysis of the industry with respect to transmission and distribution planning. The aim of the Intelligrid program is to create the technical foundation for a smart power grid that links electricity with communications and computer control to achieve tremendous gains in reliability, capacity, and customer services. This study assesses the capabilities of tools currently used towards this system enhancement, identifie...

2007-06-28T23:59:59.000Z

150

Improving Electricity Resource-Planning Processes by Considering the Strategic Benefits of Transmission  

E-Print Network (OSTI)

to equitable recovery of project costs. Our research hasrules, transmission project costs are spread over all userspercentage of total project cost. Experts in the management

Budhraja, Vikram

2010-01-01T23:59:59.000Z

151

Puget Sound Area Electric Reliability Plan. Appendix E: Transmission Reinforcement Analysis : Draft Environmental Impact Statement.  

Science Conference Proceedings (OSTI)

Five transmission line options and several reactive (voltage support) options are presently being considered as possible solutions to the PSAERP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. These options were derived from earlier study work that was summarized in Puget Sound Reinforcement Transmission Options'' and New Cross Mountain Transmission Line Alternative: The Crosstie'', which are attached. The initial Transmission Options study report recognized the value to system performance of adding an entirely new circuit rather than rebuilding an existing one. However, siting realities require that rebuild options be considered. Typically, the most attractive rebuild options would be the lowest capacity (lowest voltage) circuits. But because of corridor location, length and terminal proximity, the rebuild options listed below appear to be the most promising. Schematic diagrams and QV Curves of each option are also attached. It should be noted that Snoqualmie and Echo Lake refer to the same station east of Puget Sound and Naneum and Kittitas refer to the same station in the Ellensburg area. 100 figs., 20 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

152

H2RES: Energy Planning of Islands and Isolated Regions Website | Open  

Open Energy Info (EERE)

H2RES: Energy Planning of Islands and Isolated Regions Website H2RES: Energy Planning of Islands and Isolated Regions Website Jump to: navigation, search Tool Summary LAUNCH TOOL Name: H2RES: Energy Planning of Islands and Isolated Regions Website Focus Area: Crosscutting Topics: System & Application Design Website: www.powerlab.fsb.hr/h2RES/index.html Equivalent URI: cleanenergysolutions.org/content/h2res-energy-planning-islands-and-iso Language: English Policies: Regulations Regulations: "Net Metering & Interconnection,Resource Integration Planning" is not in the list of possible values (Agriculture Efficiency Requirements, Appliance & Equipment Standards and Required Labeling, Audit Requirements, Building Certification, Building Codes, Cost Recovery/Allocation, Emissions Mitigation Scheme, Emissions Standards, Enabling Legislation, Energy Standards, Feebates, Feed-in Tariffs, Fuel Efficiency Standards, Incandescent Phase-Out, Mandates/Targets, Net Metering & Interconnection, Resource Integration Planning, Safety Standards, Upgrade Requirements, Utility/Electricity Service Costs) for this property.

153

Regional Partner Announces Plans for Carbon Storage Project Using CO2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regional Partner Announces Plans for Carbon Storage Project Using Regional Partner Announces Plans for Carbon Storage Project Using CO2 Captured from Coal-Fired Power Plant Regional Partner Announces Plans for Carbon Storage Project Using CO2 Captured from Coal-Fired Power Plant July 20, 2009 - 1:00pm Addthis Washington, DC - Southern Company and the Southeast Regional Carbon Sequestration Partnership (SECARB), one of seven members of the U.S. Department of Energy (DOE) Regional Carbon Sequestration Partnerships program, have announced plans to store carbon dioxide (CO2) captured from an existing coal-fired power plant. The project represents a major step toward demonstrating the viability of integrating carbon capture and storage to mitigate climate change. This storage project, located in the Citronelle Oil Field north of Mobile,

154

ESP 171 Urban and Regional Planning White Paper: Local Government Solutions  

E-Print Network (OSTI)

1 ESP 171 Urban and Regional Planning White Paper: Local Government Solutions Topic Description due:50pm Hardcopy of paper due 6/6 at noon Purpose The purpose of a "white paper" is to help policy makers of potential solutions. In this assignment, you will write a 5-page white paper about a local planning issue

Handy, Susan L.

155

Multi-criteria assessment for linking regional conservation planning and farm-scale actions  

Science Conference Proceedings (OSTI)

Regional-scale ecological restoration priorities such as increasing the extent and quality of native vegetation are generally planned at catchment scales, while on-ground restoration actions are generally implemented at paddock or farm scales. This paper ... Keywords: Conservation planning, GIS, MCA, Precision agriculture

A. Zerger; G. Warren; P. Hill; D. Robertson; A. Weidemann; K. Lawton

2011-01-01T23:59:59.000Z

156

Dual Estimates of the Optimal Plan Model and Regional Market Costs: A Relationship  

Science Conference Proceedings (OSTI)

The relationship between linear programming dual estimates for the optimal production plan model and real regional market costs is studied. A two-stage linear programming model is necessary for exact approximation of cost allocation in analyzing with ...

Yu. M. Tsodikov; Ya. Yu. Tsodikova

2001-04-01T23:59:59.000Z

157

The Use of a GDSS Tool in Regional Economic Planning: A Case Study  

Science Conference Proceedings (OSTI)

A Group Decision Support System GDSS process named FACILITATOR was used in one phase of a 4 month regional economic development and planning effort. Leaders from 15 key organizations met in groups to articulate economic development goals and action strategies. ...

Joseph E. Garcia; Ken S. Keleman; L. Floyd Lewis

1990-10-01T23:59:59.000Z

158

Integrating regional strategic transportation planning and supply chain management : along the path to sustainability  

E-Print Network (OSTI)

A systems perspective for regional strategic transportation planning (RSTP) for freight movements involves an understanding of Supply Chain Management (SCM). This thesis argues that private sector freight shippers and ...

Sgouridis, Sgouris P

2005-01-01T23:59:59.000Z

159

Region-based model of tour planning applied to interactive tour generation  

Science Conference Proceedings (OSTI)

The paper addresses a tour planning problem, which encompasses weakly specified constraints such as different kinds of activities together with corresponding spatial assignments such as locations and regions. Alternative temporal orders of planed activities ...

Inessa Seifert

2007-07-01T23:59:59.000Z

160

(DOE/EIS-0128): Mitigation Action Plan for the Los Banos-Gates Transmission project 1/28/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Date: ____________________________ 1 Date: ____________________________ 1 Western Area Power Administration Mitigation Action Plan for the Los Banos - Gates (Path 15) Transmission Project 1.0 INTRODUCTION 1.1 HISTORY AND BACKGROUND In May 2001, Secretary of Energy Spencer Abraham directed the Western Area Power Administration (Western) to take the first steps, including the preparation of environmental studies, toward developing the Los Banos - Gates Transmission Project, also known as the Path 15 Project. This directive was issued to carry out a recommendation in the May 2001 National Energy Policy. Western is a Power Marketing Administration within the Department of Energy (DOE) whose role is to market and transmit electricity from multi- use water projects in the western United States, including California. The

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project (DOE/EIS-0128) (12/3/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Date: December 3, 2003 1 2 Date: December 3, 2003 1 Western Area Power Administration Mitigation Action Plan for the Los Banos - Gates (Path 15) Transmission Project 1.0 INTRODUCTION 1.1 HISTORY AND BACKGROUND In May 2001, Secretary of Energy Spencer Abraham directed the Western Area Power Administration (Western) to take the first steps, including the preparation of environmental studies, toward developing the Los Banos - Gates Transmission Project, also known as the Path 15 Project. This directive was issued to carry out a recommendation in the May 2001 National Energy Policy. Western is a power marketing administration within the Department of Energy (DOE) whose role is to market and transmit electricity from multi-use water projects in the western United States, including California. The Path 15 Project, located in California's western

162

California's electricity system of the future scenario analysis in support of public-interest transmission system R&D planning  

Science Conference Proceedings (OSTI)

The California Energy Commission directed the Consortium for Electric Reliability Technology Solutions to analyze possible future scenarios for the California electricity system and assess transmission research and development (R&D) needs, with special emphasis on prioritizing public-interest R&D needs, using criteria developed by the Energy Commission. The scenarios analyzed in this report are not predictions, nor do they express policy preferences of the project participants or the Energy Commission. The public-interest R&D needs that are identified as a result of the analysis are one input that will be considered by the Energy Commission's Public Interest Energy Research staff in preparing a transmission R&D plan.

Eto, Joseph; Stovall, John P.

2003-04-01T23:59:59.000Z

163

WECC 10-Year Plan general presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bradley Nickell Bradley Nickell Director of Transmission Planning Regional Transmission Expansion Planning (RTEP) DOE EAC Meeting October 20, 2011 2 Regional Transmission Expansion Planning What have we been asked to do? Regional Transmission Expansion Planning (RTEP) Expand the breadth and depth of WECC's existing regional transmission planning processes. * Expand stakeholder participation * Increase the understanding of the connection between reliability, cost, and environment * Produce credible, publically available data and models 3 RTEP Organizational Funding Diagram VGS Integration Topic B WGA WIRAB/CREPC Public Policy $12.0M WREZ Phases 3 & 4 National Labs Request for Technical Assistance/Coordination Topic A WECC/TEPPC Interconnection-wide Planning $14.5M Columbia

164

Toward a national plan for the accelerated commercialization of solar energy: guidelines for regional planning  

DOE Green Energy (OSTI)

This document provides data and guidelines for the development of regional programs for the accelerated commercialization of solar energy. It estimates the solar potential for individual regions based on the solar resources, competing costs of energy, and specific regional characteristics. It also points out the primary decision makers, technology distributors, and potential barriers that should be addressed by a commercialization program.

Miller, G.; Bennington, G.; Bohannon, M.; Gerstein, R.; Kannan, N.; Page, A.; Rebibo, K.; Shulman, M.; Swepak, P.; Taul, J.

1980-01-01T23:59:59.000Z

165

Elimination of higher-order diffraction using zigzag transmission grating in soft x-ray region  

Science Conference Proceedings (OSTI)

We present a realization of the sinusoidal transmission function using a series of zigzag-profiled strips where the transmission takes on the binary values 0 and 1 in a two-dimensional distribution. A zigzag transmission grating of 1000 line/mm has been fabricated and demonstrated on the soft x-ray beam of synchrotron radiation. The axial single-order diffraction indicates that the zigzag transmission grating is adequate for spectroscopic application.

Zang, H. P.; Wang, C. K. [Research Center of Laser Fusion, China Academy of Engineering Physics, Mianyang, Sichuan 621900 (China); Institute of Atomic and Molecular Physics, Sichuan University, Chengdu 610065 (China); Gao, Y. L.; Zhou, W. M.; Kuang, L. Y.; Wei, L.; Fan, W.; Zhang, W. H.; Zhao, Z. Q.; Cao, L. F.; Gu, Y. Q.; Zhang, B. H. [Research Center of Laser Fusion, China Academy of Engineering Physics, Mianyang, Sichuan 621900 (China); Jiang, G. [Institute of Atomic and Molecular Physics, Sichuan University, Chengdu 610065 (China); Zhu, X. L.; Xie, C. Q. [Institute of Microelectronics, Chinese Academy of Sciences, Beijing 100029 (China); Zhao, Y. D.; Cui, M. Q. [Institute of High Energy Physics, Chinese Academy of Sciences, Beijing 100049 (China)

2012-03-12T23:59:59.000Z

166

Energy Conservation and Development Plan. Southern Tier Central Region, New York  

DOE Green Energy (OSTI)

A summary is presented of the work of 40 volunteers working with regional planners to imagine, assess, and prescribe for the development of local energy resources (wind, solar, biomass, and water) and for conservation of all forms of energy. The plan contains a brief summary of the process the citizens followed in formulating the plan, the plans themselves, and appendices which contain more detailed comments by citizens on the possible consequences of the development of each resource. The areas (Chemung, Steuben, and Schuyler counties) experienced severe natural gas curtailments during the winter of 1976-1977. The formulation of an emergency energy conservation plan is also presented.

Not Available

1979-07-01T23:59:59.000Z

167

Current trends in transmission system planning needed in competitive and deregulated environment using artificial intelligence  

Science Conference Proceedings (OSTI)

This paper picturesquely depicts the changing trends and values under new circumstances which are developed in the sector of electric power system i.e. generation side and partly on the way in transmission and distribution network. A very clear advocacy ... Keywords: competitive, congestion, deregulation, market dynamic, monitoring, restructuring

Aamir Mahboob Ilahi; Suhail Aftab Qureshi

2006-05-01T23:59:59.000Z

168

Improving Electricity Resource-Planning Processes by Consideringthe Strategic Benefits of Transmission  

SciTech Connect

Current methods of evaluating the economic impacts of new electricity transmission projects fail to capture the many strategic benefits of these projects, such as those resulting from their long life, dynamic changes to the system, access to diverse fuels, and advancement of public policy goals to integrate renewable-energy resources and reduce greenhouse gas emissions.

Budhraja, Vikram; Mobasheri, Fred; Ballance, John; Dyer, Jim; Silverstein, Alison; Eto, Joseph

2009-03-02T23:59:59.000Z

169

A FRAMEWORK FOR THE ANALYSIS OF TRANSMISSION PLANNING IN THE MARKET ENVIRONMENT  

E-Print Network (OSTI)

, Spain 61801 Urbana, IL, USA Javier.Contreras@uclm.es bosquez@uiuc.edu gross@uiuc.edu Abstract ­ The need not kept pace with the increasing demand for transmission services [1]. In the short-term, the only way result in a generation/demand schedule with higher total costs and entailing losses of market efficiency

Gross, George

170

Saint Kitts and Nevis-Regional Implementation Plan for CARICOM's Climate  

Open Energy Info (EERE)

Saint Kitts and Nevis-Regional Implementation Plan for CARICOM's Climate Saint Kitts and Nevis-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Jump to: navigation, search Name Saint Kitts and Nevis-Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Agency/Company /Organization Climate and Development Knowledge Network (CDKN), United Kingdom Department for International Development, Caribbean Community Climate Change Centre (CCCCC) Partner Caribbean Community Climate Change Centre (CCCCC), Caribbean Community Heads of State (CARICOM) Sector Climate, Energy, Land Topics Adaptation, Background analysis, Low emission development planning, -LEDS, Market analysis, Pathways analysis Website http://cdkn.org/project/planni Program Start 2009 Program End 2015 Country Saint Kitts and Nevis

171

Reservoir Simulation Used to Plan Diatomite Developement in Mountainous Region  

E-Print Network (OSTI)

In Santa Barbara County, Santa Maria Pacific (an exploration and production company) is expanding their cyclic steam project in a diatomite reservoir. The hilly or mountainous topography and cut and fill restrictions have interfered with the company's ideal development plan. The steep hillsides prevent well pad development for about 22 vertical well locations in the 110 well expansion plan. Conventional production performs poorly in the area because the combination of relatively low permeability (1-10 md) and high viscosity (~220 cp) at the reservoir temperature. Cyclic steam injection has been widely used in diatomite reservoirs to take advantage of the diatomite rocks unique properties and lower the viscosity of the oil. Some companies used deviated wells for cyclic steam injection, but Santa Maria Pacific prefers the use only vertical wells for the expansion. Currently, the inability to create well pads above 22 vertical well target locations will result in an estimated $60,000,000 of lost revenue over a five year period. The target locations could be developed with unstimulated deviated or horizontal wells, but expected well rates and expenses have not been estimated. In this work, I use a thermal reservoir simulator to estimate production based on five potential development cases. The first case represents no development other than the cyclic wells. This case is used to calibrate the model based on the pilot program performance and serves as a reference point for the other cases. Two of the cases simulate a deviated well with and without artificial lift next to a cyclic well, and the final two cases simulate a horizontal well segment with and without artificial lift next to a cyclic well. The deviated well with artificial lift results in the highest NPV and profit after five years. The well experienced pressure support from the neighboring cyclic well and performed better with the cyclic well than without it. Adding 22 deviated wells with artificial lift will increase the project's net profit by an estimated $7,326,000 and NPV by $2,838,000 after five years.

Powell, Richard

2012-08-01T23:59:59.000Z

172

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network (OSTI)

Project” Presented at Transmission Line Siting Models.last major interregional transmission line to California wasowner. It has built transmission lines across California to

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

173

Framework for designing regional planning architecture for APTS-enabled regional multimodal public transportation system  

E-Print Network (OSTI)

Unsustainable transportation systems have been the cause of many problems facing urban areas around the world. Lack of regard for sustainable development considerations by those responsible for planning and implementing ...

Zakaria, Zulina

2004-01-01T23:59:59.000Z

174

Regional electric energy planning: a case study in the politics of scarce resources. Master thesis  

SciTech Connect

An attempt was made to examine the regional electric energy picture in the Pacific Northwest. Using the Bonneville Power Administration and Seattle City Light as the two major foci, the analysis discusses the past and present interaction of the regional electric energy planning entities.

Birmingham, A.

1976-01-01T23:59:59.000Z

175

DOE Transmission Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Workshop November 1, 2012 Federal Energy Regulatory Commission Commissioner Cheryl LaFleur 1 FERC's Transmission Efforts Reliability and Grid Security Planning...

176

Electromagnetic interference from transmission lines located in central region of Saudi Arabia  

Science Conference Proceedings (OSTI)

This paper discusses the electromagnetic interference (EMI) generated by transmission lines operating in the Central Region of Saudi Arabia. These lines have operating voltages of 132, 230 and 380 kV and are located in a hot, dry arid desert land where precipitaton is very low. Measurements of typical EMI characteristics such as frequency spectrum, lateral profile and statistical variation are performed for each type of line and results are analyzed. It is found that general noise characteristic of these lines are similar to those reported in the literature for other lines which are located in relatively wet environment. The results further show that if operating gradients are low, the increase of EMI due to rain is lower than 20 dB value usually observed. The presence of sand and dust storms does not increase EMI level in any appreciable manner. The fair weather EMI level of these lines can be predicted with reasonable accuracy by using the CIGRE formula. Results are also presented for power line carrier related EMI.

Al-Arainy, A.A.; Malik, N.H.; Abdul-Aal, L.N.

1988-01-01T23:59:59.000Z

177

Electromagnetic interference from transmission lines located in central region of Saudi Arabia  

Science Conference Proceedings (OSTI)

This paper discusses the electromagnetic interference (EMI) generated by transmission lines operating in the Central Region of Saudi Arabia. These lines have operating voltages of 132, 230 and 380 kV and are located in a hot, dry arid desert land where precipitation is very low. Measurements of typical EMI characteristics such as frequency spectrum, lateral profile and statistical variation are performed for each type of line and results are analyzed. It is found that general noise characteristic of these lines are similar to those reported in the literature for other lines which are located in relatively wet environment. The results further show that if operating gradients are low, the increase of EMI due to rain is lower than 20 dB value usually observed. The presence of sand and dust storms does not increase EMI level in any appreciable manner. The fair weather EMI level of these lines can be predicted with reasonable accuracy by using the CIGRE formula. Results are also presented for power line carrier related EMI.

Al-Arainy, A.A.; Malik, N.H.; Abdul-Aal, L.N.

1989-01-01T23:59:59.000Z

178

Utilization of Energy Efficiency and Demand Response as Resources for Transmission and Distribution Planning  

Science Conference Proceedings (OSTI)

EPRI began its Energy Efficiency Initiative in early 2007. Initiative research, which covers numerous topics associated with energy efficiency and demand management, is categorized into three areas: analytics, infrastructure, and devices. The project described in this report details the Initiative’s analytics element, which deals with methods and tools for analyzing aspects of the use of energy efficiency as supply resource, including measurement and verification, inclusion in generation planning, emissi...

2008-02-05T23:59:59.000Z

179

Midwest Independent Transmission System Operator (MISO) Energy Storage Study  

Science Conference Proceedings (OSTI)

Midwest Independent Transmission System Operator (MISO) is a nonprofit member-based organization regulated by the Federal Energy Regulatory Commission (FERC). As a Regional Transmission Organization (RTO), MISO provides electricity consumers in 13 states with regional grid management and open access to transmission facilities at a tariff closely regulated by FERC. MISO follows a cycle known as the MISO Transmission Expansion Plan (MTEP) that results in annual recommendations to proceed with expansion pro...

2012-02-29T23:59:59.000Z

180

The Cost of Transmission for Wind Energy: A Review of Transmission...  

NLE Websites -- All DOE Office Websites (Extended Search)

Wind Energy: A Review of Transmission Planning Studies Title The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies Publication Type Report Year of...

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Topic A Awardee: Eastern Interconnection Planning Collaborative |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Awardee: Eastern Interconnection Planning A Awardee: Eastern Interconnection Planning Collaborative Topic A Awardee: Eastern Interconnection Planning Collaborative Eastern Interconnection Planning Collaborative The Eastern Interconnection Planning Collaborative (EIPC) was initiated by a coalition of regional Planning Authorities. These Planning Authorities are entities listed on the NERC compliance registry as Planning Authorities and represent the entire Eastern Interconnection. The EIPC was founded to be a broad-based, transparent collaborative process among all interested stakeholders: State and Federal policy makers Consumer and environmental interests Transmission Planning Authorities Market participants generating, transmitting or consuming electricity within the Eastern Interconnection. The EIPC will provide a grass-roots approach which builds upon the regional

182

Electric Transmission and Distribution Future R&D Needs Planning, Operation, Control, and Visualization  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

27-28, 2013 27-28, 2013 Washington, DC FY13 DOE/CERTS Transmission Reliability R&D Internal Program Review Research Projects Reliability Standards Analysis and Assessments  Frequency Response Event Collection and Analysis  NERC Interconnections 2012 Annual Grid Reliability Performance Analysis and Report Page 1 Reliability Standards Analysis and Assessment  Objective: Collect grid data and conduct grid reliability performance analysis to support the NERC committees/groups (Resources Subcommittee and RS- Frequency Working Group) in the following ways: - Perform grid reliability metrics analysis using data collected in CERTS applications as requested by the RS - Analyze collected data to assess reliability performance at different levels - Interconnection, Reliability Coordinator, Balancing Authority

183

Comments from the Virginia Department of Environmental Quality on PEPCO's Intention to Commence Planned Transmission Outages  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COMMONWEALTH of VIRGINIA COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY Street address: 629 East Main Street, Richmond, Virginia 23219 Mailing address: P.O. Box 10009, Richmond, Virginia 23240 Fax (804) 698-4500 TDD (804) 698-4021 www.deq.virginia.gov W. Tayloe Murphy, Jr. Secretary of Natural Resources Robert G. Burnley Director (804) 698-4000 1-800-592-5482 January 5, 2006 The Honorable Samuel W. Bodman Secretary of Energy United States Department of Energy 1000 Independence Avenue, S.W. Washington, D.C. 20585 Re: District of Columbia Public Service Commission Docket No. EO-05-01 Dear Secretary Bodman: The Virginia Department of Environmental Quality (DEQ) strongly opposes the Potomac Electric Power Company's (PEPCO) intention to commence planned maintenance outages of the

184

A Comprehensive Approach to Bi-National Regional Energy Planning in the Pacific Northwest  

SciTech Connect

The Pacific NorthWest Economic Region, a statutory organization chartered by the Northwest states of Alaska, Washington, Idaho, Montana, and Oregon, and the western Canadian provinces of British Columbia, Alberta, and the Yukon through its Energy Working Group launched a bi-national energy planning initiative designed to create a Pacific Northwest energy planning council of regional public/private stakeholders from both Canada and the US. There is an urgent need to deal with the comprehensive energy picture now before our hoped for economic recovery results in energy price spikes which are likely to happen because the current supply will not meet predicted demand. Also recent events of August 14th have shown that our bi-national energy grid system is intricately interdependent, and additional planning for future capacity is desperately needed.

Matt Morrison

2007-12-31T23:59:59.000Z

185

Using Travel Time Reliability Measures to Improve Regional Transportation Planning and URS Corporation  

E-Print Network (OSTI)

, connectivity, and safety to evaluate the transportation system's health and determine where future investmentsUsing Travel Time Reliability Measures to Improve Regional Transportation Planning and Operations of the Transportation Research Board January 13­17, 2008 Revised November 3, 2007 TRB 2008 Annual Meeting CD-ROM Paper

Bertini, Robert L.

186

Workshop title: Transmission and Utility Scale Solar Opportunities "South of Phoenix" (or should we say "in Arizona" if we inc  

NLE Websites -- All DOE Office Websites (Extended Search)

Purpose: A stakeholder communication with transmission customers, Tribes, developers, state Purpose: A stakeholder communication with transmission customers, Tribes, developers, state and federal agencies, and utilities about Western Area Power Administration's (Western) Rocky Mountain Region (RMR) and its Transmission Planning and Business Unit. The workshop will provide an overview of Western RMR's transmission planning and services and provide an opportunity for open discussion on overcoming transmission challenges in the region. The workshop will also meet the local transmission planning process requirements for FERC Order 890 as outlined in Western's Open Access Transmission Tariff.

187

Regional power systems planning: a state of the art assessment. Final report  

SciTech Connect

The purpose of this report was to define regional power systems planning problems, the tools available and their shortcomings, and to document all of the above in a concise readable form. The approach consisted of a survey and literature search. The survey determined the tools being used by utilities, the tools they had rejected, and the tools they planned to try out. The literature search was conducted for the purpose of documenting the tools available, and performing a comparative analysis of these tools. The project included a mix of utility, university, and consulting organizations. Several organizations were consulted in the selection of the participants. A non-profit organization, The University of Oklahoma, was selected to manage the project. The results were reviewed in a series of four one day meetings by known authorities in each field. This report consists of the results of this project. Perhaps its major finding is that several aspects of the regional planning problem are not well defined, the roles of the various participants in regional planning is not clear, and certainly research is needed for the development of new methodology.

Not Available

1980-10-01T23:59:59.000Z

188

Transmission Expansion in Argentina 5: The Regional Electricity Forum of Buenos Aires Province  

E-Print Network (OSTI)

that adhered to the federal scheme 3 used for expansions and developments at 132 kV or lower, including low voltage grids, isolated generation in small towns, rural electrification and small hydroelectric power plants. Some 3893 km of 132 kV transmission...

Littlechild, Stephen C; Ponzano, Eduardo A

189

Strategic Energy Management Plan: General Services Administration, Region 10, Northwest/Arctic Region  

NLE Websites -- All DOE Office Websites (Extended Search)

the mission of the General Services the mission of the General Services Administration is to help federal agencies better serve the public by offering, at best value, superior workplaces and expert solutions, acquisition services, and management policies. our vision as staff of GSA's Northwest/Arctic Region is to serve as strategic real estate advisors who provide superior, sustainable workspace solutions that exceed customer expectations, enhance worker productivity, and reflect our understanding of client needs while providing environmental leadership within the communities we serve. our core values are "SAIL ON" which stands for Support, Accountability, Integrity, Loyalty and trust, Ownership/commitment, and Nurture a fun workplace. i table of contents

190

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

191

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network (OSTI)

availability and demand needs are incorporated into models to quantify the benefits of new transmission.Availability and use of a common database (consisting of other expected new generation and transmission

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

192

Midwest Transmission Workshop III Summary  

DOE Green Energy (OSTI)

OAK-B135 On March 12-13, 2002, the National Wind Coordinating Committee (NWCC), in cooperation with regional stakeholders, held a two-day workshop: Planning for Electrical Transmission Needs in the Upper Midwest. The workshop was the outgrowth of an effort to develop a forum and process for consideration of transmission options that strives for equitable allocation of benefits and impacts among all affected parties. The goal of this workshop was to provide a catalyst for an enhanced, inclusive process for transmission planning with participation of and acceptance by all affected stakeholders. Participants in the meeting included representatives of state and regional regulatory agencies, utilities and power generators, the wind industry, environmental and landowner interests, and other interested parties (see Attachment A for a list of meeting participants).

Kevin Bryan

2003-03-12T23:59:59.000Z

193

New Mexico/Transmission | Open Energy Information  

Open Energy Info (EERE)

New Mexico/Transmission New Mexico/Transmission < New Mexico Jump to: navigation, search NewMexicoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in New Mexico is part of the Southwest Area Transmission power grid which is part of the WestConnect Transmission Planning area, and covers the desert southwest of the United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in New Mexico. In addition, WECC provides an environment for coordinating the operating and planning

194

A Case Study to Evaluate the Reliability Impact of Large-Scale Wind Generation: Incorporating Variable Generation and Loads into Rel iability-based Transmission Planning  

Science Conference Proceedings (OSTI)

This report describes a case study using a probabilistic framework to capture variations in output of variable generation connected to the transmission system along with system loads. The research in 2010, 2011, and some part of 2012 focused on developing the probabilistic model framework. The focus of the 2012 work was to use this model on a real-world (as opposed to a test system) transmission planning case along with data for all the variable generation and system loads modeled in the case to ...

2013-08-29T23:59:59.000Z

195

Using a Collaborative Approach to Interconnection-Wide Transmission Analyses  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Planning in Interconnection-Wide Planning in the Eastern Interconnection EIPC Update for the DOE Electricity Advisory Committee October 20, 2011 David A. Whiteley Presentation Topics * Update on process and structure * Study results so far * Value unlocked * What's next 2 Update on Process and Structure * EIPC - 26 EI Planning Authorities (Planning Coordinators) * Integrate and analyze approved regional plans * Develop interregional expansion scenarios to be studied * Develop interregional transmission expansion options * Consistent with Orders 890 and 1000 * Self-funded * Primary activity is DOE funded interconnection studies project - 2 phases 3 Who are the PAs? * Alcoa Power Generating * American Transmission Co. * Duke Energy Carolinas * Electric Energy Inc. * Entergy *

196

Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Methane Hydrate Multi-Year R&D Program Plan NATIONAL METHANE HYDRATE MULTI-YEAR R&D PROGRAM PLAN U.S. Department of Energy Office of Fossil Energy Federal Energy Technology Center...

197

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network (OSTI)

Energy Research/ Energy System Integration Transmission-Research Program Energy System Integration Public InterestCommission’s PIER Energy Systems Integration program for

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

198

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network (OSTI)

Case Selection • Natural Gas Prices • Demand • Hydrology •Natural gas price forecast - Near-term new generation - DemandDemand-side alternatives to transmission • Integration of natural gas

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

199

Plan for the long term environmental assessment of geopressured resource development in the Louisiana Gulf Coast Region  

DOE Green Energy (OSTI)

Results of research to develop a plan for the long-term environmental assessment of geopressured/geothermal resource development in the Louisiana Gulf Coast region are reported. An overall view of the environmental issues facing decision-makers in the area of geopressured resource development is presented, along with a plan for monitoring potential environmental impacts. Separate assessments and plans are presented for geological effects, air and water quality, ecosystem quality, and socioeconomic and cultural considerations. (JGB)

Newchurch, E.J.; Bryan, C.F.; Harrison, D.P.; Muller, R.A.; Wilcox, R.E.; Bachman, A.L.; Newman, J.P.; Cunningham, K.J.; Hilding, R.K.; Rehage, J.A.

1978-07-15T23:59:59.000Z

200

Plan for Conduct of 2012 Electric Transmission Congestion Study: Federal Register Volume 76, No. 218 - Nov. 10, 2011  

Energy.gov (U.S. Department of Energy (DOE))

Section 216(a)(1) of the Federal Power Act (FPA) requires the Department of Energy to complete a study of electric transmission congestion every three years. The Department initiated preparations...

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Current conflicts in U.S. Electric transmission planning, cost allocation and renewable energy policies: More heat than light?  

Science Conference Proceedings (OSTI)

To surmount obstacles to expanding and upgrading the nation's transmission system that are impeding development of the renewables sector, it is critical that these issues be resolved quickly and on a consistent rather than ad hoc basis. (author)

Bloom, David; Forrester, J. Paul; Klugman, Nadav

2010-12-15T23:59:59.000Z

202

Review and evaluation of contingency plans for oil and hazardous substances in the upper Great Lakes region. Final report  

SciTech Connect

The purpose of this study was to update and supplement a contingency plan review conducted for the Corps in 1979 by the St. Lawrence-Eastern Ontario Commission for handling oil and hazardous-substance spills on the upper Great Lakes and their connecting channels. Special attention was given to cleanup and control methods described for ice conditions that may exist in the region in winter. The report identifies existing contingency plans in the study area; tabulates amounts, types, and locations of equipment and manpower that exist to implement the plans; describes methods to contain and recover oil in ice conditions; describes spill-mitigation plans and techniques to protect natural resources; describes techniques of deflecting oil in swift flowing waters; and describes disposal plans identified in the contingency plans.

Gundlach, E.R.; Murday, M.; Fanning, W.L.

1986-11-15T23:59:59.000Z

203

Overview of Rocky Mountain Region's Capital Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Capital Investment Plan 2 Transmission Planning Workshop 2011 10-YR Network Load Forecast Study and Process Transmission Planning Loveland, CO June 21, 2011 3 Purpose ...

204

2012 National Electric Transmission Congestion Study Workshops | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Planning » Transmission Planning » Congestion Studies » 2012 National Electric Transmission Congestion Study Workshops 2012 National Electric Transmission Congestion Study Workshops DOE hosted four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. For details, please select a workshop, below. Agendas, presentations, and transcripts are available on the individual workshop pages; please select a workshop from the list below. Note: The November 10, 2011 Federal Register notice incorrectly stated that the four regional workshops would be simulcast over the Internet and that advanced registration for the Webcasts was required. The workshops were not simulcast. The Department requested, but did not require, those who

205

2009 National Electric Transmission Congestion Study Workshops | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Technology Development » Transmission Planning » Services » Technology Development » Transmission Planning » Congestion Studies » 2009 Congestion Study » 2009 National Electric Transmission Congestion Study Workshops 2009 National Electric Transmission Congestion Study Workshops DOE hosted six regional pre-study workshops in mid-2008 to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study, including comments on practical metrics for gauging levels and significance of transmission congestion. Each workshop featured a panel of invited speakers to present their views and comments. For details, including agendas, transcripts, and documents submitted for consideration for the 2009 study, please select a workshop, below. June 11, 2008 San Francisco, CA June 18, 2008 Oklahoma City, OK

206

Transmission Investment Incentives  

Science Conference Proceedings (OSTI)

This report documents the use of agent-based simulation as a tool for studying transmission investment incentives, and it is meant to illuminate what accounts for the difficulties in aligning incentives for enhancing the transmission system. The report suggests that a new method of calculation for bid optimization be applied to the economic analysis of long-term incentives for transmission investment. This technology can be broadly applied to help negotiators in transmission planning quantify their count...

2006-12-21T23:59:59.000Z

207

National Transmission Grid Study: 2002 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Grid Study: 2002 National Transmission Grid Study: 2002 National Transmission Grid Study: The National Energy Policy Plan directed the U.S. Department of Energy (DOE)...

208

Mitigation Action Plan for the McNary-John Day Transmission Line Project,(DOE/EIS-0332)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Measures Adopted Measures Adopted for the McNary-John Day Transmission Line Project Land Use and Recreation Locate towers and roads so as not to disrupt irrigation circles, where possible. Locate structures and roads outside of agricultural fields, orchards, and vineyards, where possible. Coordinate with landowners for farm operations, including plowing, crop dusting, and harvesting. Redesign irrigation equipment and compensate landowner for additional reasonable costs where new right-of-way needs to be acquired. Compensate farmers for crop damage and restore compacted soils. Control weeds around the base of the towers. Keep gates and fences closed and in good repair to contain livestock. Repair damages to access roads caused by or arising out of Bonneville use, leaving roads in good or better

209

Regional systems development for geothermal energy resources: Pacific region (California and Hawaii). Task I: implementation plan development, topical report  

DOE Green Energy (OSTI)

Eleven implementation plans were prepared. They represent some 21 reservoir-site developments and 48 geothermal power plant developments. The plans consist of three integrated elements: (1) a bar-chart schedule that depicts interdependencies among activities and shows significant milestones on the path from initial exploration to power on-line, (2) task descriptions, and (3) the responsible performers. During the preparation of the implementation plans, the tasks required for resource development at each KGRA were defined on a generalized work breakdown structure (WBS) diagram. A generalized WBS dictionary (task descriptions) was also compiled. In addition, a specific WBS for each KGRA was prepared in a tabular and indented format. The tasks formed the basis for the schedular activities. Institutional responsibilities, based upon the WBS, were identified and are also shown on the tabular WBS. In this manner, implementation plans evolved whose schedular, task, and responsibility elements were integrated with one another. In order to provide logically consistent time estimates, and a reasonable basis for comparison, schedule modules were developed for some recurring activities which are essentially common to all KGRAs. In the preparation of multiple plant schedules for a given KGRA, the interactive effects of power development on the ancillary resources of the area were considered so that interfaces and constraining situations would be identified. Within Imperial County, this process was taken one step further to include the influence that development at the several close-lying KGRAs would have upon one another. A set of recommendations for the accelerated development of geothermal energy resources was prepared and the potential implementors were suggested.

Michler, D.W.

1979-03-26T23:59:59.000Z

210

Definition: Planning Authority | Open Energy Information  

Open Energy Info (EERE)

facility and service plans, resource plans, and protection systems.1 Related Terms transmission lines, transmission line References Glossary of Terms Used in Reliability...

211

Regional Climate Projections of Extreme Heat Events in Nine Pilot Canadian Communities for Public Health Planning  

Science Conference Proceedings (OSTI)

Public health planning needs the support of evidence-based information on current and future climate, that could be used by health professionals and decision-makers to better understand and respond to the health impacts of extreme heat. Climate ...

Barbara Casati; Abderrahmane Yagouti; Diane Chaumont

212

Electric Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

213

DOE/EIS-0285/SA-101: Supplement Analysis for the Transmission System Vegetation Management Program FEIS Spokane Region (9/13/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13, 13, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-101) Spokane Region Michael F. Brock - TFS/BELL-1 Regional Manager, Spokane Region Proposed Action: Vegetation Management for Substations and Non-Electric Facilities (See Attachment A for a complete list of facilities) Location: Spokane Region. (See Attachment A) Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities. Vegetation management within the substation shall include the bare ground management of all graveled areas. These areas shall primarily be maintained with the use of herbicides. The management of vegetation outside the substation and associated facilities shall include: 1) bare

214

Designing electricity transmission auctions  

E-Print Network (OSTI)

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

215

National Transmission Grid Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

216

Western Area Power Administration, Desert Southwest Region Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm  

NLE Websites -- All DOE Office Websites (Extended Search)

Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Replacements at Structure 0/7 - Continuation Sheet Special Conditions Biological Resources 1. To avoid impacts to nesting birds, project activities will be scheduled between August 1 and February 15, as feasible. Crews shall not cause injury or death to nesting birds, active nests, eggs, or nestlings. If evidence of a nesting bird is found in the project area, crews shall immediately stop work in that area until Western's Environmental Group has been contacted. 2. A qualified biologist will be present during all project activities and serve as the project's Biological Monitor. The Biological Monitor will be authorized by Western to temporarily halt construction activity if needed to prevent harm to desert tortoise. The Biological Monitor's

217

Biennial Assessment of the Fifth Power Plan Appendix A Regional Economy  

E-Print Network (OSTI)

-effectiveness of natural gas power plants are the cost of natural gas (assessed elsewhere), capital cost and thermal of coal-fired electricity generation. In addition, the delivered price of coal to power plants located used in the plan are more appropriate to a power plant that has purchased pipeline capacity to ensure

218

Environmental Planning and Policy in the Los Angeles Region: Openings and Opportunities  

E-Print Network (OSTI)

industry, particularly oil refineries. The unwillingness ofemitters such as the oil refineries); and an acceptance ofpolluters in the region (the refineries or utilities) would

FitzSimmons, Margaret; Gottlieb, Robert

1994-01-01T23:59:59.000Z

219

Transmission INTRODUCTION  

E-Print Network (OSTI)

Transmission INTRODUCTION An electrical power system requires constant, second by second, balancing to maintain control over the transmission system can result in failure of the entire electrical system of supply, demand, and transmission capability. Transmission system operators are primarily responsible

220

U.S. Department of Energy Region 6 Radiological Assistance Program response plan. Revision 2  

Science Conference Proceedings (OSTI)

Upon request, the DOE, through the Radiological Assistance Program (RAP), makes available and will provide radiological advice, monitoring, and assessment activities during radiological incidents where the release of radioactive materials is suspected or has occurred. Assistance will end when the need for such assistance is over, or if there are other resources available to adequately address the incident. The implementation of the RAP is usually accomplished through the recommendation of the DOE Regional Coordinating Office`s (RCO) on duty Regional Response Coordinator (RRC) with the approval of the Regional Coordinating Office Director (RCOD). The DOE Idaho Operations Office (DOE-ID) is the designated RCO for DOE Region 6 RAP. The purpose of this document is: to describe the mechanism for responding to any organization or private citizen requesting assistance to radiological incidents; to coordinate radiological assistance among participating federal agencies, states, and tribes in DOE Region 6; and to describe the RAP Scaled Response concept of operations.

Jakubowski, F.M.

1998-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Mitigation Action Implementation Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany and Laramie Counties, Wyoming, and Weld County, Colorado  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany, and Laramie Counties, Wyoming, and Weld County, Colorado September 2006 CH-MM and AU-CH Mitigation Action Plan Sept. 2006 1 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Resources for Which the Mitigation Will Be Implemented Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Land use, transportation Construction Contractor Western Maintenance The contractor will limit the movement of crews and equipment to the ROW, including access routes. The contractor will limit movement on the ROW to minimize damage to

222

Summary report on the Solar Consumer Assurance Network (SOLCAN) Program Planning Task in the southern region  

DOE Green Energy (OSTI)

The goal of the SOLCAN Program Planning Task is to assist in the development, at the state and local levels, of consumer assurance approaches that will support the accelerated adoption and effective use of new products promoted by government incentives to consumers to meet our nation's energy needs. The task includes state-conducted evaluations and state SOLCAN meetings to identify consumer assurance mechanisms, assess their effectiveness, and identify and describe alternative means for strengthening consumer and industry assurance in each state. Results of the SOLCAN process are presented, including: a Solar Consumer Protection State Assessment Guide; State Solar Consumer Assurance Resources for Selected States; State Solar Consumer Protection Assessment Interviews for Florida; and state SOLCAN meeting summaries and participants. (LEW)

Browne, M. B. [comp.] [comp.

1981-03-15T23:59:59.000Z

223

Chapter 4 Transmission Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development and deployment of a national strategy on transmission that meets the needs of all parties is extremely complex; however, a solution is desperately needed. Chapter 4 Transmission Adequacy More Documents & Publications Draft Chapter 4: Transmission Adequacy

224

Energy Efficiency in Western Utility Resource Plans Implications for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

in Western Utility Resource Plans Implications in Western Utility Resource Plans Implications for Regional Assessments and Initiatives Energy Efficiency in Western Utility Resource Plans Implications for Regional Assessments and Initiatives Project scope: Comparative analysis of recent resource plans filed by 14 utilities in the Western U.S. and Canada. Analyze treatment of conventional & emerging resource options-including energy efficiency (EE)-Assess risk analysis & portfolio management -Develop more standardized methods and conventions for resource assessment-Summarize how issues are handled in resource plans; identify "best practices" and offer recommendations-Create information tools for CREPC that facilitate work on related projects (e.g. regional transmission planning) Energy Efficiency in Western Utility Resource Plans Implications for

225

An Integrated Computer Modeling Environment For Regional Land Use, Air Quality, And Transportation Planning  

E-Print Network (OSTI)

The Land Use, Air Quality, and Transportation Integrated Modeling Environment (LATIME) represents an integrated approach to computer modeling and simulation of land use allocation, travel demand, and mobile source emissions for the Albuquerque, New Mexico, area. This environment provides predictive capability combined with a graphical and geographical interface. The graphical interface shows the causal relationships between data and policy scenarios and supports alternative model formulations. Scenarios are launched from within a Geographic Information System (GIS), and data produced by each model component at each time step within a simulation is stored in the GIS. A menudriven query system is utilized to review link-based results and regional and areawide results. These results can also be compared across time or between alternative land use scenarios. Using this environment, policies can be developed and implemented based on comparative analysis, rather than on single-step future pr...

Charles Hanley Renewable; Norman L. Marshall; Charles J. Hanley; Charles J. Hanley

1997-01-01T23:59:59.000Z

226

Planning and Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Ten-Year Capital Program Projects Lovell-Yellowtail Transmission Line Rebuild project Studies WACM Wind production summary overview (Oct. 2006)...

227

National Electric Transmission Congestion Study 2012 Workshops | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Congestion Study 2012 Workshops Transmission Congestion Study 2012 Workshops National Electric Transmission Congestion Study 2012 Workshops DOE will host four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the National Electric Transmission Congestion Study 2012. For details, please see the pdfs, below. Online registration for these workshops is now available. Agendas are available below. Note: The November 10, 2011 Federal Register notice incorrectly stated that the four regional workshops will be simulcast over the Internet and that advanced registration for the Webcasts is required. The workshops will not be simulcast. The Department requests, but does not require, those who are planning to attend the workshops in person to pre-register using the link

228

Reliabilit PlanningReliability Planning David Duebner, Expansion Planningp g  

E-Print Network (OSTI)

EE552 Reliabilit PlanningReliability Planning David Duebner, Expansion Planningp g September 27, 2010 #12;Reliability Planning OverviewReliability Planning Overview · Midwest ISO Transmission Expansion Plan (MTEP)p ( ) · MTEP Reliability Study Process ­ Planning Criteriag ­ Reliability Analysis

McCalley, James D.

229

Incorporating global warming risks in power sector planning: A case study of the New England region. Volume 1  

SciTech Connect

Growing international concern over the threat of global climate change has led to proposals to buy insurance against this threat by reducing emissions of carbon (short for carbon dioxide) and other greenhouse gases below current levels. Concern over these and other, non-climatic environmental effects of electricity generation has led a number of states to adopt or explore new mechanisms for incorporating environmental externalities in utility resource planning. For example, the New York and Massachusetts utility commissions have adopted monetized surcharges (or adders) to induce emission reductions of federally regulated air pollutants (notably, SO{sub 2}, NO{sub x}, and particulates) beyond federally mandated levels. These regulations also include preliminary estimates of the cost of reducing carbon emissions, for which no federal regulations exist at this time. Within New England, regulators and utilities have also held several workshops and meetings to discuss alternative methods of incorporating externalities as well as the feasibility of regional approaches. This study examines the potential for reduced carbon emissions in the New England power sector as well as the cost and rate impacts of two policy approaches: environmental externality surcharges and a target- based approach. We analyze the following questions: Does New England have sufficient low-carbon resources to achieve significant reductions (10% to 20% below current levels) in fossil carbon emissions in its utility sector? What reductions could be achieved at a maximum? What is the expected cost of carbon reductions as a function of the reduction goal? How would carbon reduction strategies affect electricity rates? How effective are environmental externality cost surcharges as an instrument in bringing about carbon reductions? To what extent could the minimization of total electricity costs alone result in carbon reductions relative to conventional resource plans?

Krause, F.; Busch, J.; Koomey, J.

1992-11-01T23:59:59.000Z

230

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

231

Energy Efficiency in Western Utility Resource Plans: Impacts on Regional Resources Assessment and Support for WGA Policies  

E-Print Network (OSTI)

Energy Efficiency in Resource Plans 27 References..33 Glossaryan Energy Efficient Economy: ACEEE-U054, October. Glossary

Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

2006-01-01T23:59:59.000Z

232

DOE Electricity Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(including regional diversity, AC-DC transmission and distribution solutions, microgrids, energy storage, and centralized-decentralized control) * Accommodates two-way flows...

233

Reg Harman, Philippe Menerault, Alain L'Hostis in Spatial Planning Systems of Britain and France" Public transport in cities and regions -facing an uncertain future?  

E-Print Network (OSTI)

" Public transport in cities and regions - facing an uncertain future? x.1 Introduction This chapter addresses transport policies in the two countries. Transport is a crucial factor in spatial planning. At its simplest, the quality and speed of transport affects the area within which people can live their lives

Paris-Sud XI, Université de

234

Business Plan in Brief : Draft.  

SciTech Connect

Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA`s draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA`s first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization.

United States. Bonneville Power Administration.

1994-06-01T23:59:59.000Z

235

Energy Efficiency in Western Utility Resource Plans: Impacts on Regional Resources Assessment and Support for WGA Policies  

E-Print Network (OSTI)

Plan 2004”. Southern California Edison (SCE), 2004. “Southern California Edison Company’s 2004 Long-term9. Southern California Edison (SCE), 2006. CPUC Advice 1955-

Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

2006-01-01T23:59:59.000Z

236

New Planning Framework  

Science Conference Proceedings (OSTI)

This report describes an investigation into how various regulatory, economic, and technical changes are likely to affect the framework for transmission planning. It begins with an overview of the Existing Planning Framework, structured along the lines of five key aspects that encompass the purview, role, and responsibilities of transmission planning. The report then explores seven scenarios (future states) of transformative change in the electricity industryranging from the greater penetration of wind ge...

2010-12-22T23:59:59.000Z

237

Transmission Workshop | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

238

Scenario development for water resources planning and watershed management: Methodology and semi-arid region case study  

Science Conference Proceedings (OSTI)

Utilizing the scenario development framework from Mahmoud et al. (2009), a set of scenarios were developed for and applied in the Verde River Watershed in Arizona, USA. Through a scenario definition exercise, three dimensions of future change with respective ... Keywords: Scenario development, Scenario planning, Scenarios, Water resources management, Water resources planning

Mohammed I. Mahmoud; Hoshin V. Gupta; Seshadri Rajagopal

2011-07-01T23:59:59.000Z

239

Transmission Reliability | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

240

Open Access Transmission Tariff  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Energy Efficiency in Western Utility Resource Plans: Impacts on Regional Resources Assessment and Support for WGA Policies  

E-Print Network (OSTI)

Goal.6 Figure 2-2. Accounting for Energy Efficiency2-3. Accounting for Energy Efficiency Resources in LoadFigure 3-1. Plan Energy Efficiency Program Effects: Annual

Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

2006-01-01T23:59:59.000Z

242

Energy Efficiency in Western Utility Resource Plans: Impacts on Regional Resources Assessment and Support for WGA Policies  

E-Print Network (OSTI)

Goal.6 Figure 2-2. Accounting for Energy Efficiency8 Figure 2-3. Accounting for Energy Efficiency Resources in10 Figure 3-1. Plan Energy Efficiency Program Effects:

Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

2006-01-01T23:59:59.000Z

243

Energy Efficiency in Western Utility Resource Plans: Impacts on Regional Resources Assessment and Support for WGA Policies  

E-Print Network (OSTI)

5% of total energy requirements for BC Hydro and PacifiCorp1 Avista BC Hydro PacifiCorp PGE Total energy requirementsNorthwestern Energy, and BC Hydro) plan to offset ~30–50% of

Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

2006-01-01T23:59:59.000Z

244

Great Plains Wind Energy Transmission Development Project  

DOE Green Energy (OSTI)

In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the EERC, in collaboration with Meridian Environmental Services, developed and demonstrated the efficacy of a wind energy forecasting system for use in scheduling energy output from wind farms for a regional electrical generation and transmission utility. With the increased interest at the time of project award in the production of hydrogen as a critical future energy source, many viewed hydrogen produced from wind-generated electricity as an attractive option. In addition, many of the hydrogen production-related concepts involve utilization of energy resources without the need for additional electrical transmission. For this reason, under Task 4, the EERC provided a summary of end uses for hydrogen in the region and focused on one end product in particular (fertilizer), including several process options and related economic analyses.

Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

2012-06-09T23:59:59.000Z

245

Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.  

SciTech Connect

For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA has taken in its OM R programs, a utility comparison team was assembled in early January 1989. The team included representatives from BPA's Management Analysis, Internal Audit and Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of more than 250 electric utilities in the US and Canada. The selection criteria generally pertained to size, with key factors including transformation capacity, load, gross revenue, and interstate transmission and/or marketing agreements, and their OM R programs. Information was gathered during meetings with managers and technical experts representing the four utilities. Subsequent exchanges of information also took place to verify findings. The comparison focused on: Transmission operations and maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs. 2 figs., 21 tabs.

United States. Bonneville Power Administration.

1990-09-01T23:59:59.000Z

246

Planning India's long-term energy shipment infrastructures for electricity and coal  

Science Conference Proceedings (OSTI)

The Purdue Long-Term Electricity Trading and Capacity Expansion Planning Model simultaneously optimizes both the expansion of transmission and generation capacity. Most commercial electricity system planning software is limited to only transmission planning. An application of the model to India's national power grid, for 2008-2028, indicates substantial transmission expansion is the cost-effective means of meeting the needs of the nation's growing economy. An electricity demand growth rate of 4% over the 20-year planning horizon requires more than a 50% increase in the Government's forecasted transmission capacity expansion, and 8% demand growth requires more than a six-fold increase in the planned transmission capacity expansion. The model minimizes the long-term expansion costs (operational and capital) for the nation's five existing regional power grids and suggests the need for large increases in load-carrying capability between them. Changes in coal policy affect both the location of new thermal power plants and the optimal pattern inter-regional transmission expansions. 15 refs., 10 figs., 7 tabs.

Brian H. Bowen; Devendra Canchi; Vishal Agarwal Lalit; Paul V. Precke; F.T. Sparrow; Marty W. Irwin [Purdue University, West Lafayette, IN (United States). Energy Center at Discovery Park

2010-01-15T23:59:59.000Z

247

Colorado/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

Colorado/Transmission/Local Regulations Colorado/Transmission/Local Regulations < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Local Siting Process Under state law, Colorado counties and municipalities are given broad authority to plan for and regulate the use of land within their jurisdictions.[1] State statutes give local governments (counties and municipalities) the authorization to; Appoint planning commissions [2] which are required to prepare and adopt master plans or comprehensive plans for physical development within

248

An optimization-model-based interactive decision support system for regional energy management systems planning under uncertainty  

Science Conference Proceedings (OSTI)

In this study, an interactive decision support system (UREM-IDSS) has been developed based on an inexact optimization model (UREM, University of Regina Energy Model) to aid decision makers in planning energy management systems. Optimization modeling, ... Keywords: Decision making, Energy management systems, Green house gas, Interactive decision support system, Optimization, Sustainable development, Uncertainty

Y. P. Cai; G. H. Huang; Q. G. Lin; X. H. Nie; Q. Tan

2009-03-01T23:59:59.000Z

249

Remarks for DOE Workshop Regarding Transmission Congestion Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2011 6, 2011 Remarks for DOE Workshop Regarding Transmission Congestion Study Thank you for the opportunity to speak today. I am Ed Finley and I chair the North Carolina Utilities Commission. By way of background, with the exception of a very small portion of the State - the northeast - North Carolina does not participate in a regional transmission organization, or RTO, and our electric utilities remain vertically integrated. North Carolina's electric utilities are required to plan their systems on a least-cost, integrated basis, considering generation and transmission costs, as well as energy efficiency and demand-side management. There is no retail competition in North Carolina. Regulation in North Carolina follows the "command and control" model. The NC Commission must

250

Semiclassical transmission across transition states  

E-Print Network (OSTI)

It is shown that the probability of quantum-mechanical transmission across a phase space bottleneck can be compactly approximated using an operator derived from a complex Poincar\\'e return map. This result uniformly incorporates tunnelling effects with classically-allowed transmission and generalises a result previously derived for a classically small region of phase space.

Stephen C. Creagh

2005-06-01T23:59:59.000Z

251

Definition: Network Integration Transmission Service | Open Energy  

Open Energy Info (EERE)

Network Integration Transmission Service Network Integration Transmission Service Jump to: navigation, search Dictionary.png Network Integration Transmission Service Service that allows an electric transmission customer to integrate, plan, economically dispatch and regulate its network reserves in a manner comparable to that in which the Transmission Owner serves Native Load customers.[1] Related Terms transmission lines, transmission customer, transmission line, native load, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Network_Integration_Transmission_Service&oldid=502560" Categories: Definitions

252

Oil and hazardous substances pollution contingency plan. Region VIII. Colorado, Montana, North Dakota, South Dakota, Utah, Wyoming  

SciTech Connect

This report contains names of government agencies and personnel, maps, cleanup equipment and procedures for reporting and coordinating response in the event of an emergency spill or fish kill in navigable waters of Region VIII.

1971-11-01T23:59:59.000Z

253

Cooperation (Transmission  

E-Print Network (OSTI)

Pricing in Wireless Networks Peter Marbach Department of Computer Science University of Toronto #12; Model/Terminology A B #15; Routes are Fixed #15; C r : Capacity of Node r #15; U r (x r ): Utility Function of Node r 6 #12; Model/Terminology #15; x r : Transmission Rate of Node r #15; y r

Marbach, Peter

254

STAFF PAPER A Review of Transmission Losses in  

E-Print Network (OSTI)

STAFF PAPER A Review of Transmission Losses in Planning Studies Lana Wong Electricity Analysis Office Electricity Supply Analysis Division California Energy Commission would like to acknowledge the following individuals for providing their insight into transmission

255

A Study to Assess Needed Improvements and Barriers in Planning and Delivering Agricultural Extension Activities in the Kurdistan Region of Iraq  

E-Print Network (OSTI)

The purpose of this study was to assess planning and delivering agricultural extension activities in the Kurdistan region of Iraq for future program implementation. The study was a descriptive research and used a modified Delphi technique to identify needed improvements and highlight barriers in planning and delivering extension activities by the willingness of extension workers. The population of the study was 50 MOAWR purposely selected government employees consisted of 10 extension experts, 15 extension administrators, and 25 extension agents. The study used three rounds web-based survey questionnaires. In Round I, the panelists were responded to two open ended questions to identify needed improvements and barriers in planning and delivering extension activities. The gathered information from Round I was examined, organized, and combined to create the second questionnaire for Round II. In Round II, the panelists were indicated their levels of agreement or disagreement about each needed improvement and barrier. The study employed a six-Likert scale with 1=”Strongly Agree”, 2=”Agree”, 3=”Somewhat Agree”, 4=”Somewhat Disagree”, 5=”Disagree”, and 6=”Strongly Disagree”. The needed improvements and barriers that received two-thirds of agreement (numbers 1 and 2 in the six-point Likert scale) were used to create the third questionnaire for Round III. In Round III, panelists were developed consensus by rating the statements that received two-third agreement in Round II. Equally, the same Round II six-point Likert scale was used in Round III. The result findings of the study were revealed to the demands of extension policy implementation in the region. The results of the study were summarized in three overall implementation theme areas: community based program development, building capacity program, and institutional structuring and three distinct research areas: leadership in extension, personal traits of extension agents, and external communication. Furthermore, the results of the study provided key points and details for each implementation theme and distinct research area.

Khoshnaw, Yousif Khalid

2013-08-01T23:59:59.000Z

256

Department of Energy Announces Plans for Additional Comment Period...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces Plans for Additional Comment Period on National Interest Electric Transmission Corridors Department of Energy Announces Plans for Additional Comment Period on National...

257

EA-1456: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

456: Mitigation Action Plan EA-1456: Mitigation Action Plan Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming...

258

EA-1617: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Mitigation Action Plan EA-1617: Mitigation Action Plan Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, Big Horn and Carbon Counties,...

259

EIS-0422: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Action Plan EIS-0422: Mitigation Action Plan Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Mitigation measures and estimated time of implementation within...

260

Underground Transmission Systems Reference Book  

Science Conference Proceedings (OSTI)

The Underground Transmission Systems Reference Book covers all stages of cable system design and operation, from initial planning studies to failure analysis. It contains contributions from many of the industry's experts and represents practices from all parts of the United States.

1993-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Definition: Transmission Planner | Open Energy Information  

Open Energy Info (EERE)

Planner Planner Jump to: navigation, search Dictionary.png Transmission Planner The entity that develops a long-term (generally one year and beyond) plan for the reliability (adequacy) of the interconnected bulk electric transmission systems within its portion of the Planning Authority Area.[1] Related Terms transmission lines, transmission line, planning authority, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Planner&oldid=502606" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties

262

Relationships of Light Transmission, Stratification and Fluorescence in the Hypoxic Region of the Texas-Louisiana Shelf in Spring/Summer 2009  

E-Print Network (OSTI)

The growth of phytoplankton in hypoxic waters requires nutrients and light. In river plumes of the coastal ocean, river borne surface nutrient concentrations decrease with distance from the river mouth. Light availability at the surface also changes with distance from the river source, as particulates and other materials sink through the water column. Using in situ CTD sensors, water samples of nutrients, and ship flow-through data from two Louisiana Shelf research cruises, April and July 2009, the relationship between transmissivity, photosynthetically available radiation (PAR), stratification, and fluorescence are analyzed. PAR is measured using a silicon photovoltaic detector and is measured in the 400 to 700 nm range. A fluorometer is used to measure the fluorescence of chlorophyll a in g/L and is a proxy indicator for phytoplankton biomass. The Louisiana Shelf is home to the largest hypoxic zone in the western hemisphere, covering on average more than 15000 sq. km. The Louisiana hypoxic zone occurs seasonally in summer and is typically dissipated by physical processes in fall. Hypoxia is defined as waters that have a dissolved oxygen concentration of 1.4 ml/L and is the level at which marine organisms are typically adversely affected. Preliminary results show expected relationships between transmissivity and fluorescence in the water column indicating a positive correlation between light availability and fluorescence. The spatial distribution of stratification, light availability, fluorescence, and nutrients are compared for the different seasons.

Towns, Jenny L

2010-05-01T23:59:59.000Z

263

2009 National Electric Transmission Congestion Study - Hartford...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hartford Workshop 2009 National Electric Transmission Congestion Study - Hartford Workshop On July 9, 2008, DOE hosted a regional pre-study workshop in Hartford, CT to receive...

264

2012 National Electric Transmission Congestion Study - Philadelphia...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Philadelphia Workshop 2012 National Electric Transmission Congestion Study - Philadelphia Workshop On December 6, 2011, DOE hosted a regional pre-study workshop in Philadelphia, PA...

265

2009 National Electric Transmission Congestion Study - Oklahoma...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Oklahoma City Workshop 2009 National Electric Transmission Congestion Study - Oklahoma City Workshop On June 18, 2008, DOE hosted a regional pre-study workshop in Oklahoma City,...

266

ESSAYS IN FINANCIAL TRANSMISSION RIGHTS PRICING.  

E-Print Network (OSTI)

??This work examines issues in the pricing of financial transmission rights in the PJM market region. The US federal government is advocating the creation of… (more)

Posner, Barry

2006-01-01T23:59:59.000Z

267

High DSM Scenario Request for the 2011 TEPPC Transmission Expansion Plan (and Treatment of DSM in Reference Case/Other Scenarios) Recommendation of the State/Provincial Steering Committee DSM Working Group  

E-Print Network (OSTI)

At the November 6, 2009 meeting of the State-Provincial Steering Committee (SPSC), the SPSC agreed that it would submit a high DSM scenario to TEPPC and requested that the DSM Working Group prepare the request, for review and approval by the SPSC. This document outlines the approach recommended by the DSM Work Group for developing a high DSM scenario, to be modeled in the 2011 TEPPC 10-Year Transmission Expansion Plan. 1 In addition, the DSM Working Group has developed recommendations for the treatment of DSM in the reference case and two scenarios (Carbon Reduction and Breakthrough Technology) proposed by the Scenario Working Group. Table 1 sets for the recommended approach for these items, for energy efficiency (EE), demand response (DR), combined heat and power (CHP) and distribution system efficiency upgrades. These recommendations have been informed by the technical assistance of Lawrence Berkeley National Laboratory (LBNL) and the non-state officials participating in the DSM Working Group, as well as the state official/commissioner members of the Group.

unknown authors

2009-01-01T23:59:59.000Z

268

Arizona/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Arizona‎ | Transmission Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Arizona, the state has the authority to site high-voltage transmission lines. A public service corporation would need to obtain a Certificate of Environmental Compatibility (CEC) from the Arizona Power Plant and Transmission Line Siting Committee that is "affirmed and approved" by the Arizona Corporation Commission (ACC). State Siting Act Arizona Revised Statute (A.R.S.)§ 40-360 et seq. State Preemptive Authority If the Transmission Line Siting Committee (TLSC) finds that compliance with local ordinances, master plan or regulation is unreasonably restrictive and compliance is not feasible in view of technology available, then the TLSC may grant a certificate.[1]

269

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

states: "Plans should designate sites of power generation and the location of electric transmission lines in areas intended to support desired levels of urban and rural...

270

Microsoft PowerPoint - WAPA Transmission Developments in NM ...  

NLE Websites -- All DOE Office Websites (Extended Search)

authorities: NM, CO, WY, KS, ND, UT, SD & ID Tasked with planning and financing of transmission lines within their respective states RETA has the additional requirement that...

271

Regional Competitions - EERE Commercialization Office  

Regional Competitions. Six Regional Clean Energy Business Plan Competitions are taking place across the country– representing all of the United ...

272

Airspace: Antarctic Sound Transmission  

E-Print Network (OSTI)

Antarctic Sound Transmission Andrea Polli Director,investigates how sound transmission can contribute to thePoles. How have such transmission-based projects developed

Polli, Andrea

2009-01-01T23:59:59.000Z

273

Transmission Investment: A Primer  

SciTech Connect

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

274

Strategic Intelligence & Technology Watch Newsletter for Transmission Losses  

Science Conference Proceedings (OSTI)

Adequate transmission capacity is key to overall grid reliability and proper functioning of electricity markets. However, building new transmission infrastructure is more difficult than ever. Increasing the efficiency of existing transmission systems, and integrating energy efficiency and demand response as part of the overall transmission planning process, could defer the need for new transmission infrastructure and reduce the CO2 footprint of the electricity sector. Utilities are under increasing press...

2008-12-23T23:59:59.000Z

275

(DOE/EIS-0285/SA-127): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/19/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP/4 KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-127- Eugene-Alvey#2 Benjamin Tilley - TFE/Alvey Proposed Action: Vegetation Management for the Eugene-Alvey 115 kV transmission line from structure 7/1 through structure 12/2m, and along portions of the following adjacent transmission lines: Hawkins-Alvey 115KV and Alvey-Lane 115KV. Location: The project is located in the BPA Eugene Region in Lane County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to

276

Recovery Act Interconnection Transmission Planning | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

policy and regulatory decisions in the years to come and provide critical information to electricity industry planners, states and others to develop a modernized, low-carbon...

277

Interconnection-Wide Transmission Planning Initiative - Meeting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012 Section 1222 of the Energy Policy Act 2005 International Electricity Regulation Presidential Permits Export Authorizations Pending Applications NEPA Other Regulatory...

278

Metropolitan Washington Council of Governments National Capital Region Transportation Planning Board Summary of the State of the Practice and State of the Art of Modeling Peak Spreading  

E-Print Network (OSTI)

Traffic congestion in large metropolitan areas has become so acute that many commuters are adjusting their departure and/or arrival times for work and other destinations to avoid the worst of what is now called the “peak period”. The adjustments in departure times combined with travel times that can last beyond the peak hour have led to the phenomena of peak spreading, where the peak hour demand on a particular roadway exceeds the peak hour capacity and causes demand to shift to the “shoulders ” of the peak hour, or the hours adjacent to the peak hour. This situation is so pronounced in the TPB region, that most of the major freeways in the areas have peak periods that last from roughly 6 AM to 10 AM in the morning and 3 PM to 7 PM in the evening where stop and go traffic is common throughout. The Metropolitan Washington Council of Governments, National Capital Region Transportation Planning Board (TPB) engaged Vanasse Hangen Brustlin (VHB) to review and summarize the state of the practice and the state of the art with regards to modeling peak spreading at the MPO level. VHB began this effort by reviewing the recent MPO survey and following up with staff at large MPOs with characteristics similar

unknown authors

2007-01-01T23:59:59.000Z

279

Viability of a National HVDC Transmission Ring in India  

E-Print Network (OSTI)

The paper presents the current scenario in India as regards the EHV AC and DC transmission backbone systems. The ultimate goal of the transmission sector is to create an integrated national power system grid for the effective distribution of electrical energy throughout the country. This paper proposes HVDC as an attractive alternative for the transformation of the network from independent regional grids to a fully integrated national grid, and details how the existing, decided and planned HVDC systems could be utilised in such a scheme. A conceptual scheme and control strategy is presented to achieve an HVDC national ring-main. Advantages of such a scheme in terms of its reliability, controllability and immunity to different grid disturbances are enumerated. The paper also outlines the challenges involved in terms of algorithms required for control coordination among different HVDC links and load despatch centres for achieving such a system.

Mata Prasad; Rebati Dass; S. Chakravorty; Carl-göte Carlsson; Göran Isacsson; Asea Brown; Power System Engineering

1999-01-01T23:59:59.000Z

280

Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Strategic Plan Print ALS Strategic Plan Update: March 2013 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed...

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Electric power supply and demand 1979 to 1988 for the contiguous United States as projected by the Regional Electric Reliability Councils in their April 1, 1979 long-range coordinated planning reports to the Department of Energy  

SciTech Connect

Information concerning bulk electric power supply and demand is summarized and reviewed. Electric-utility power-supply systems are composed of power sources, transmission and distribution facilities, and users of electricity. In the United States there are three such systems of large geographic extent that together cover the entire country. Subjects covered are: energy forecasts, peak demand forecasts, generating-capacity forecasts, purchases and sales of capacity, and transmission. Extensive data are compiled in 17 tables. Information in two appendices includes a general description of the Regional Electric Reliability Councils and US generating capacity as of June 30, 1979. 3 figures, 17 tables.

Savage, N.; Graban, W.

1979-12-01T23:59:59.000Z

282

Hydromechanical transmission  

DOE Patents (OSTI)

A power transmission having three planetary assemblies, each having its own carrier and its own planet, sun, and ring gears. A speed-varying module is connected in driving relation to the input shaft and in driving relationship to the three sun gears, all of which are connected together. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being connected in driving relation to the input shaft, the other unit, which may have a fixed stroke, being connected in driving relation to the sun gears. The input shaft also drives the carrier of the third planetary assembly. A brake grounds the first carrier in the first range and in reverse and causes drive to be delivered to the output through the first ring gear in a hydrostatic mode. The carrier of the third planetary assembly drives the ring gear of the second planetary assembly, and a first clutching means connects the second carrier with the output in a second range, the brake for grounding the first carrier then being released. A second clutching means enables the third ring gear to drive the output shaft in a third range.

Orshansky, Jr. deceased, Elias (LATE OF San Francisco, CA); Weseloh, William E. (San Diego, CA)

1978-01-01T23:59:59.000Z

283

Eastern Interconnection Planning Collaborative News Release | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). Eastern Interconnection Planning Collaborative News Release More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes 2012 National Electric Transmission Congestion Study - Philadelphia Workshop EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning

284

Overview of Rocky Mountain Region's Capital Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Workshop Planning Workshop Overview of Western's Current Transmission Planning Activities Robert H. Easton aeaston@wapa.gov (970) 461-7272 Transmission Planning - North Loveland, CO June 21, 2011 1 Transmission Planning Workshop AGENDA - 10-Yr Network Study Process NERC TPL- Study Process Capital Investment Plan 2 Transmission Planning Workshop 2011 10-YR Network Load Forecast Study and Process Transmission Planning Loveland, CO June 21, 2011 3 Purpose  Evaluate the steady state load serving capability of the integrated system.  Identify problem areas due to projected system load growth.  Allows for inclusion of necessary projects in Capital Investment Plan (CIP).  Ensure that system development keeps pace with load growth in order to continue serving Preference

285

An incentive-based mechanism for transmission asset investment  

Science Conference Proceedings (OSTI)

This paper presents an incentive scheme to encourage investment in the improvement and expansion of the transmission in the competitive electricity market environment. To create these incentives, a decentralized transmission asset investment model is ... Keywords: Cooperative game theory, Investment incentives, Shapley value, Social welfare, Transmission planning

Javier Contreras; George Gross; José Manuel Arroyo; José Ignacio Muñoz

2009-04-01T23:59:59.000Z

286

NWCC Transmission Case Study III  

DOE Green Energy (OSTI)

OAK-B135 Transmission System Improvements for Wind Energy Development in the Upper Midwest and Great Plains: Opportunities and Obstacles. This case study set out to ascertain the validity of three assumptions from the perspectives of stakeholders involved in wind energy and transmission issues in the Upper Midwest and Great Plains. The assumptions, and the stakeholders' reactions to each, are summarized below: Assumption 1--Transmission system improvements would provide significant benefits to the electricity network and its customers. Respondents acknowledge the potential for overall system benefits in the form of reduced line losses, improved grid stability and reliability, and enhanced ability to conduct spot market transactions. They also agree that these benefits relate to specific regional needs. However, there is disagreement over the extent of other benefits such as efficiency gains and cost savings from reduced line losses. Further, environmental and community interest groups point out that none of these benefits are realized without significant financial, environmental and social costs. Assumption 2--The benefits of transmission improvements would be helpful, but not confined, to wind power. All respondents agree that wind energy could benefit from transmission system improvements. But they also acknowledge, reluctantly, in the case of environmental stakeholders, that the benefits of an improved transmission system cannot be limited to environmentally preferable forms of generation. Some environmental and community advocate respondents also feel that transmission system improvement projects can be avoided altogether through energy conservation and efficiency measures, and by substituting wind energy for fossil generation. Assumption 3--Transmission alliances among stakeholders within and external to the wind community can provide benefits in the public interest. The fractured, multi-jurisdictional governance of the regional transmission system, and the distrust and diversity of perspectives among affected stakeholders, may make the formation of multi-stakeholder alliances necessary to accomplishing transmission goals. If the wind industry and utilities want to partner with environmental and community advocate groups in supporting a transmission project, they may have to convince these groups that the project would result in a net environmental benefit. The project proponents would have to make the case that the benefits of the additional wind energy will at least offset the emissions of any additional fossil generation made possible by the transmission project, as well as offset the environmental impact of the transmission project itself.

Terry Allison, Steve Wiese

2000-03-01T23:59:59.000Z

287

MAP 5.50: PJM Service Area in Virginia PJM operates the electric transmission system in Virginia served by Allegheny Power (AP), American  

E-Print Network (OSTI)

(DOM), as shown on MAP 5.50. The transmission system in Virginia delivers power to customers from native generation resources and power transfers across tie-line facilities with the rest of the PJM and other adjoining systems to the west and south. Critical RTEP Issues in Virginia PJM continues to address a number of issues with a bearing on reliability in Virginia and the regional transmission expansion plans required to maintain it: A new 502 Junction-Mt. Storm-Meadowbrook-Loudoun 500kV transmission line is needed to avoid reliability criteria violations in 2011 and maintain power transfers to serve northern

unknown authors

2007-01-01T23:59:59.000Z

288

Assumptions to the Annual Energy Outlook 2000 - Natural Gas Transmission  

Gasoline and Diesel Fuel Update (EIA)

Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each forecast year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. In addition, natural gas flow patterns are a function of the pattern in the previous year, coupled with the relative prices of gas supply options as translated to the represented market “hubs.” The major assumptions used within the NGTDM are grouped into five general categories. They relate to (1) the classification of demand into core and noncore transportation service classes, (2) the pricing of transmission and distribution services, (3) pipeline and storage capacity expansion and utilization, (4) the implementation of recent regulatory reform, and (5) the implementation of provisions of the Climate Change Action Plan (CCAP). A complete listing of NGTDM assumptions and in-depth methodology descriptions are presented in Model Documentation: Natural Gas Transmission and Distribution Model of the National Energy Modeling System, Model Documentation 2000, DOE/EIA-M062(2000), January 2000.

289

Assumptions to the Annual Energy Outlook 1999 - Natural Gas Transmission  

Gasoline and Diesel Fuel Update (EIA)

The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each forecast year. These are derived by obtaining market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. In addition, natural gas flow patterns are a function of the pattern in the previous year, coupled with the relative prices of gas supply options as translated to the represented market “hubs.” The major assumptions used within the NGTDM are grouped into five general categories. They relate to (1) the classification of demand into core and noncore transportation service classes, (2) the pricing of transmission and distribution services, (3) pipeline and storage capacity expansion and utilization, (4) the implementation of recent regulatory reform, and (5) the implementation of provisions of the Climate Change Action Plan (CCAP). A complete listing of NGTDM assumptions and in-depth methodology descriptions are presented in Model Documentation Report: Natural Gas Transmission and Distribution Model of the National Energy Modeling System, DOE/EIA-MO62/1, January 1999.

290

2009 National Electric Transmission Congestion Study - Atlanta Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 National Electric Transmission Congestion Study - Atlanta 2009 National Electric Transmission Congestion Study - Atlanta Workshop 2009 National Electric Transmission Congestion Study - Atlanta Workshop On July 29, 2008, DOE hosted a regional pre-study workshop in Atlanta, GA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda and full transcript are available below. 7-29-08 Congestion Workshop Agenda - Atlanta, GA.pdf Transcript - 2009 National Electric Transmission Congestion Study Atlanta Workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2012 National Electric Transmission Congestion Study - St. Louis Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop

291

Accounting-related transmission issues  

Science Conference Proceedings (OSTI)

Various initiatives have been undertaken by the Federal Energy Regulatory Commission (FERC) to deregulate wholesale electric energy markets. These initiatives have focused on restructuring the transmission systems in the US and recently have culminated in a proposal requiring formation of and participation in regional transmission organizations. The overall form of regulation selected to determine rates for transmission entities as well as underlying regulatory decisions reached on key issues will have profound implications for transmission entities. For example, traditional cost-based regulation would require one set of accounting and reporting rules, while incentive-based regulation may not be subject to those same rules. An overview of some of the major accounting and financial reporting issues that will need to be considered is presented.

Niehaus, M.; Bjorn, P.; Pate, G.

1999-12-01T23:59:59.000Z

292

DEVELOPMENT PLANNING AND REGIONAL IMBALANCES  

E-Print Network (OSTI)

All Working Papers are preliminary materials circulated to promote discussion and comment. References in publications to Working Papers should be cleared with the author to protect the tentative nature of these papers. 2

Mohamed Aslam; Asan Ali; Golam Hassan; Kedah Da; Mohamed Aslam; Gulam Hassan; Asan Ali; Golam Hassan

2003-01-01T23:59:59.000Z

293

Atlantic NAD 83 OCS Planning Areas | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

OCS Planning Areas Ocean Data Tools Technical Guide Map Gallery Regional Planning Feedback Ocean You are here Data.gov Communities Ocean Data Atlantic NAD 83 OCS Planning...

294

Regulations for Electric Transmission and Fuel Gas Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long...

295

Boundary stabilization of transmission problems  

E-Print Network (OSTI)

We study the transmission problem in bounded domains with dissipative boundary conditions. Under some natural assumptions, we prove uniform bounds of the corresponding resolvents on the real axis at high frequency, and as a consequence, we obtain free of eigenvalues regions. As an application, we get exponential decay of the energy of the solutions of the correpsonding mixed boundary value problems.

Fernando Cardoso; Georgi Vodev

2009-10-20T23:59:59.000Z

296

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Usage Transmission Transmission Once electricity is generated -- whether by burning fossil fuels; through nuclear fission; or by harnessing wind, solar, geothermal, or hydro...

297

Merchant transmission investment  

E-Print Network (OSTI)

We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

Joskow, Paul L.

2003-01-01T23:59:59.000Z

298

Wyoming/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Wyoming/Transmission < Wyoming Jump to: navigation, search WyomingTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Wyoming is part of the WestConnect Transmission Planning area, and covers the southwest of the United States. Within the WestConnect system, Wyoming is part of the Colorado Coordinated Planning Group (CCPG) power grid that covers Colorado and portions of Wyoming.

299

(DOE/EIS-0285/SA-122): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/19/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CSB-2 CSB-2 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-122- Bonneville-Alcoa Ed Tompkins, TFO/LMT Proposed Action: Vegetation Management for the Bonneville-Alcoa 115kV transmission line Location: The project is located in the BPA Olympia Region in Skamania and Clark Counties, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans

300

DOE/EIS-0285-SA-62: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (4/16/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DATE April 16, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-62) Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Rocky Reach - Maple Valley No. 1 Transmission Line ROW from structure 98/2 to structure 110/1. The transmission line is a 500 kV line. Location: The ROW is located King County, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear targeted vegetation along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation management along existing access road and

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

(DOE/EIS-0285-126): Supplement Analysis for the Transmission System Vegetation Management Program 2/19/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP-4 KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-126- Alvey Fairview Benjamin Tilley - TFE/Alvey Proposed Action: Vegetation Management for the Alvey Fairview 230kV transmission line from structure 1/1 through structure 64/7. Location: The project is located in the BPA Eugene Region in Coos, Douglas, and Lane Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently

302

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-141- SalemAlbany #2)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1- SalemAlbany #2) 1- SalemAlbany #2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Salem Albany #2 115 kV transmission line from Salem Substation to Albany Substation. Location: The project is located in the BPA Eugene Region, within Marion, Polk, and Benton Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission

303

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-140- SalemAlbany1)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0- SalemAlbany1) 0- SalemAlbany1) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Salem Albany #1 115 kV transmission line from Salem Substation to Albany Substation. Location: The project is located in the BPA Eugene Region, Marion, Linn, and Benton County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission

304

Design of resource to backbone transmission for a high wind penetration future.  

E-Print Network (OSTI)

??In a high wind penetration future, transmission must be designed to integrate groups of new wind farms with a high capacity inter-regional ``backbone" transmission system.… (more)

Slegers, James Michael

2013-01-01T23:59:59.000Z

305

Marine Planning Portal Network | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Network Ocean Data Tools Technical Guide Map Gallery Regional Planning Feedback Ocean You are here Data.gov Communities Ocean Marine Planning Portal Network A Network of...

306

2012 CERTS R&M Peer Review - Summary: Transmission Investment Under Uncertainty - Ben Hobbs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Investment Assessment Under Uncertainty about Fuel Prices, Investment Assessment Under Uncertainty about Fuel Prices, Technology, Renewables Penetration and Market Responses using a Multi-Stage Stochastic Model Approach with Recourse (Year 2) Project Lead: Hobbs Co-investigators: Schuler, Zimmerman July 20, 2012 1. Project objective To develop and apply a methodology for evaluating the impact of market, technology, and policy uncertainties upon transmission planning on a regional and multi-decadal time scale. The methodology will integrate transmission capacity expansion decisions and OPF methodologies in a decomposition scheme in order to rigorously capture operational constraints such as security constraints, ramp limitations, and transmission flow limits, as well as longer term investment issues. The methodology would address questions such

307

A Guide for Transmission Line Voltage Upgrade  

Science Conference Proceedings (OSTI)

In the last few decades, construction of new transmission facilities has not caught up with the demand for electric power. The problem of transmission capacity shortage was further compounded by deregulation of the power industry, which allows power to be dispatched from any generation source for the lowest energy cost. As a result, lines that were not planned for these power flows may now be overloaded. A number of bottlenecks were thus created, restricting power transfer from one location to another. U...

2008-12-09T23:59:59.000Z

308

Cellular/Molecular Connexin35 Mediates Electrical Transmission at Mixed  

E-Print Network (OSTI)

Cellular/Molecular Connexin35 Mediates Electrical Transmission at Mixed Synapses on Mauthner Cells regions, suggesting that connexin35-mediated electrical transmission is common in goldfish brain" (electrical and chemical) synaptic terminals that offer the unique opportunity to correlate physiological

Rash, John E.

309

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-26)(9/11/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11, 2001 11, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-26) Ben Tilley - TFE/Alvey Natural Resource Specialist Proposed Action: Vegetation Management on Reedsport-Fairview #1 Transmission Line Structure 1/5 to 39/4. Location: All ROW are located in Coos and Douglas Counties, OR, all being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA), Eugene Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently

310

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-28)(9/5/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 5, 2001 September 5, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-28) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Port Angeles - Sappo No.1 Transmission Line ROW, from struture 1/1 to structure 42/10. Location: The ROW is located in Clallum County, WA, all in the Olympia Region. Proposed by: Bonneville Power Administration (BPA), Olympia Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is

311

Energy Efficiency in Western Utility Resource Plans Implications...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Resource Plans Implications for Regional Assessments and Initiatives Energy Efficiency in Western Utility Resource Plans Implications for Regional Assessments and...

312

Flight Plan  

E-Print Network (OSTI)

“Developing broader linguistic capability and cultural understanding is…critical to prevail in the long war and meet 21 st Century challenges. The Department must dramatically increase the number of personnel proficient in key languages…and make these languages available at all levels of action and decision— from the strategic to the tactical.” 2006 Quadrennial Defense Review, p. 78 Due to the nature of immediate and likely future challenges, our Joint forces require Airmen capable of influencing the outcomes of US, allied, and coalition operations anywhere in the world. While we, the Air Force, have made considerable initial progress toward building the necessary cross-cultural skills, we recognize the existing processes for obtaining this forceenhancing capability (appropriate culture, region, language and negotiation skills) are not currently mature or robust enough to optimally meet immediate expectations or near-future requirements. Therefore, it is imperative that we tailor our cultural, regional, and language competency development to maximize our efforts and meet Air Force and Joint requirements informed by National guidance. To this end, the Air Force Culture, Region, and Language (CRL) Flight Plan represents our framework for implementing relevant National Security and National Defense strategies via Air Force programs. The dynamic global environment has made Cross-Cultural Competence a critical and necessary capability for the Total Force. The Air Force CRL Flight Plan supports the

unknown authors

2009-01-01T23:59:59.000Z

313

Concurrent Wind Cooling in Power Transmission Lines  

SciTech Connect

Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

Jake P Gentle

2012-08-01T23:59:59.000Z

314

Conservation Regional Conservation SavingsRegional Conservation Savings  

E-Print Network (OSTI)

1 Northwest Power and Conservation Council Regional Conservation SavingsRegional Conservation the Plan''s Targets?s Targets? March 14, 2008 slide 2 Northwest Power and Conservation Council 55thth Plan Conservation ResourcePlan Conservation Resource Acquisition TargetsAcquisition Targets 20052005 ­­ 2009 = 700 a

315

Independent transmission company (ITC) and markets for transmission  

E-Print Network (OSTI)

Independent Abstract-- transmission company (ITC) and markets for transmission Yong T. Yoon Marija a fundamental structure for the transmission provider (TP) composed of the independent transmission company (ITC out the associated functions including managing transmission congestion. At the minimum

Ilic, Marija D.

316

Three essays concerning information transmission  

E-Print Network (OSTI)

Transmissionas an Information-Transmission Mechanism,” American EconomicConcerning Information Transmission A dissertation submitted

Boone, Johnathan

2010-01-01T23:59:59.000Z

317

Characterization of Planar Transmission Lines  

Science Conference Proceedings (OSTI)

... References on: On-Wafer Measurement and Calibration, Planar Transmission Line Characterization and Multiconductor Transmission Lines. ...

2011-12-15T23:59:59.000Z

318

San Luis Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

319

Bulk Power Transmission Study  

E-Print Network (OSTI)

"Texans now have a choice. We can become more efficient and maintain our standard of living, or we can continue business as usual and watch our standard of living erode from competition from other regions. In the past, except for improving reliability, there was no need for a strong transmission system. When Texas generation was primarily gas fueled, the extensive natural gas pipeline network moved energy easily within the state. In recent years two things have changed: 1. Electric utilities have made extensive investment in lignite, coal, and nuclear plants and, 2. Improvements in gas turbine technology and the removal of institutional barriers has encouraged cogeneration at many of our energy intensive process industries. This energy diversity means that there are now significant differences in energy costs between units. The variable costs of generation of power can vary between units by a ratio of 2 or 3 to 1 and this difference will be accentuated when energy costs rise (and they will; it’s a question of when, not if). The potential for costs savings by optional dispatching of the entire interconnected system are greater than ever before as demonstrated by the PUC's Bulk Power Transmission Study. And the potential can be enhanced with added transmission system investment. Cogeneration and small power production has proven to be the most cost effective way for Texas to add additional generating capacity needed to supply an economy that is starting to rebound and to replace old, obsolete power plants. The freedom to locate these facilities at the fuel source or at the site of large thermal demand makes real economic and environmental sense. The use of renewable or waste fuels allows something that would otherwise be wasted to contribute to our economy. Fossil fuels that are displaced can be redirected to another use or consumed for future benefit. By integrating a gas turbine generator with a. process plant, the natural gas required for producing electricity can be reduced by 40% below that required for a combined cycle. The heat rejected from a gas turbine, combined cycle, or steam plant can be redirected to a process use that contributes to our economy by producing something of value to world markets. By contrast a conventional power plant is paid for by the rate payers and consumes Texas natural resources and therefore is a burden rather than an enhancement to our economy. The optimal location of facilities are possible only if there is an adequate transmission system. Utility, consumer and industry must cooperate to improve our transmission system for the benefit of all Texas. The Texas Public Utilities Commission has taken the lead in promoting efficiency by requiring transmission wheeling between qualifying facilities and electric utilities. Several cogeneration facilities have been constructed as a result. In order to encourage small power production, the rule needs to be expanded to include projects interconnected with distribution systems. Most renewable resource projects are relatively small and cannot afford the cost of a high voltage interconnect, and yet their characteristics match a baseload need. The ability to wheel power to a utility that needs base load power from a distribution level interconnection is essential to development of these smaller projects."

John, T.

1988-09-01T23:59:59.000Z

320

State and Regional Policy Assistance - Program Activities | Department of  

NLE Websites -- All DOE Office Websites (Extended Search)

State and Regional Policy Assistance - State and Regional Policy Assistance - Program Activities State and Regional Policy Assistance - Program Activities Providing Technical Assistance to States and Regions The Electric Markets Technical Assistance Program responds to both immediate and long-terms needs of states, regions, and other organizations to implement policy and market solutions that bring about improved demand response, energy efficiency, renewable energy, and transmission utilization. Examples include: Supporting efforts by the Western Governors' Association (WGA), its subsidiary Western Interstate Energy Board (WIEB), and related ad-hoc subregional groups in the West as they work toward greater regional coordination and planning of regional electric infrastructure. (see Sample Products and Related Links or FY2003 Grants for details.)

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Colorado/Transmission/Regulatory Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Colorado‎ | Transmission Jump to: navigation, search Colorado Transmission Transmission Regulatory Roadmap Roadmap State Data Regulatory Overview General TOOLS Regulatory Roadmap Regulatory Wizard Best Practices Document Library NEPA Database Glossary TECHNOLOGIES Geothermal Solar Water Wind TOPICS Land Use Planning Land Access Exploration Well Field Power Plant Transmission Water Rights Environment The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart

322

Supplement Analysis for the Transmission System Vegetation Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

are discussed below. Planning Steps: 1. Identify facility and the vegetation management need. Work will take place along Custer-Intalco 1 230 kV transmission line. The...

323

Modeling Interregional Transmission Congestion in the National Energy Modeling System  

E-Print Network (OSTI)

22 3.4 No Coal25 3.4.1 Coal Supply Regions and Electricity Market24 Figure 3-14 Economic Transmission in No Coal

Gumerman, Etan; Chan, Peter; Lesieutre, Bernard; Marnay, Chris; Wang, Juan

2006-01-01T23:59:59.000Z

324

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

325

Arnold Schwarzenegger TRANSMISSION BENEFIT  

E-Print Network (OSTI)

California Edison's (SCE) initial Tehachapi transmission trunk-line proposal for integration of wind. The Tehachapi Transmission Project to integrate 4,500 MW of renewable wind energy has since been approved after

326

Transmission Loss Reduction Derived from the Use of Trapezoidal Conductors  

Science Conference Proceedings (OSTI)

The New York State Transmission Assessment and Reliability Study Working Group, in coordination with the New York Independent System Operator (NYISO), has developed an Age-Based In-Kind Replacement plan of aging infrastructure and other low-cost upgrades necessary to maintain existing thermal capability levels and meet reliability needs. The plan includes the refurbishment of several hundred miles of transmission lines across the NYISO footprint and assumes that conventional aluminum conductor, ...

2012-11-15T23:59:59.000Z

327

(DOE/EIS-0285/SA-13): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 6/6/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3) 3) James Jellison - TFO/Olympia Region - Natural Resource Specialist Bill Erickson - TFP/Walla Walla Region - Natural Resource Specialist Proposed Action: Vegetation Management along the Naselle Tarlett #1 and #2 transmission line Right of Way (ROW). Location: The ROW is located in Pacific County, WA, Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of

328

EIS-0231: Navajo Transmission Project | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31: Navajo Transmission Project 31: Navajo Transmission Project EIS-0231: Navajo Transmission Project SUMMARY This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in the year 2001 and operate for about 50 years. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD September 1, 1996 EIS-0231: Draft Environmental Impact Statement Draft Environmental Impact Statement Navajo Transmission Project

329

Microsoft Word - StakeholderInputForm_LocalPlanningAssessment...  

NLE Websites -- All DOE Office Websites (Extended Search)

2 (Rev. 1008) U.S. Department of Energy Southwestern Power Administration LOCAL TRANSMISSION PLANNING PARTICIPATION FORM Page 1 of Thank you for your interest in the...

330

EA-1855: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Action Plan (MAP) is part of the Finding of No Significant Impact for the Creston-Bell Transmission Line Rebuild Project (Proposed Action). The Proposed Action involves...

331

Mitigation Action Plans (MAP) and Related Documents | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

University of Delaware Lewes Campus Onsite Wind Energy Project March 1, 2011 EIS-0422: Mitigation Action Plan Central Ferry-Lower Monumental 500-kilovolt Transmission...

332

Dynamics of Transmission Provision in a Competitive PowerIndustry  

Science Conference Proceedings (OSTI)

The main objective of this paper is to revisit the operations and planning of an electric power system, and, more specifically, of its transmission system. The intent is to formulate the underlying problems as decision-making problems with specific ... Keywords: competition, discrete event dynamic systems, dynamic programming, electric power systems, optimal stochastic control, transmission

Chien-Ning Yu; Jean-Pierre Leotard; Marija D. Ilic

1999-11-01T23:59:59.000Z

333

Lesson Plans!  

NLE Websites -- All DOE Office Websites (Extended Search)

you from other teachers, educators, and professionals. These lesson plans are provided free of charge, to help you planning a challenging curriculum that will instill a love of...

334

Medical Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Medical Plans Retiree Medical Insurance Blue Cross Blue Shield of New Mexico (BCBSNM) is the provider of medical benefits. Contact Retiree Insurance Providers Medical plan options...

335

Automated manual transmission controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

1999-12-28T23:59:59.000Z

336

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

337

DOE/EIS-0285-SA-137: Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Chemawa-Salem 1&2 (4/1/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7- Chemawa-Salem1&2) 7- Chemawa-Salem1&2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Chemawa-Salem #1 115 kV and #2 230 kV transmission lines from Chemawa Substation to Salem Substation. Location: The project is located in the BPA Eugene Region, Marion County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-

338

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-142- KeelerOregon City #2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2- KeelerOregon City #2) 2- KeelerOregon City #2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Keeler-Oregon City #2 115 kV transmission line from Keeler Substation to Oregon City Substation. Includes 5 miles of the St. Johns- Oregon City #2 69 kV transmission line. Location: The project is located in the BPA Eugene Region, Washington County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation via hand cutting along the right-of-way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with

339

Definition: Transmission Service Provider | Open Energy Information  

Open Energy Info (EERE)

Transmission Service Provider The entity that administers the transmission tariff and provides Transmission Service to Transmission Customers under applicable...

340

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications 2013 Transmission Reliability Program Peer Review - Day 1...

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-22)(8/17/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 17, 2001 August 17, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-22) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Chief Joseph - Snohomish No.3 and 4 Transmission Line ROW. From STR 94/1 to STR 113/1 Location: The ROW is located in King and Snohomish Counties, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is

342

DB02/763519.0001/8994542.1 WP06 BEFORE THE OFFICE OF ELECTRICITY...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

transmission owners, and regional transmission operators ("RTOs") on transmission planning, resource planning and congestion issues. The Mich PSC, therefore, strongly...

343

Adaptive control of hydraulic shift actuation in an automatic transmission  

E-Print Network (OSTI)

A low-order dynamic model of a clutch for hydraulic control in an automatic transmission is developed by separating dynamics of the shift into four regions based on clutch piston position. The first three regions of the ...

Thornton, Sarah Marie

2013-01-01T23:59:59.000Z

344

Planning Workshop  

Science Conference Proceedings (OSTI)

Planning Workshop on Renewable Energy and Climate Science for the Americas: Metrology and Technology Challenges. ...

2013-12-05T23:59:59.000Z

345

Compliance plan for PG and E geysers unit 16  

DOE Green Energy (OSTI)

A plan is described to establish a monitoring system to assure that the geothermal power plant is constructed and operated in compliance with air and water quality, public health and safety, and other applicable regulations, guidelines, and conditions of the California Energy Commission. The plan is divided into: a Power Plant Compliance Plan and a Transmission Line Compliance Plan. (MHR)

Not Available

1981-03-01T23:59:59.000Z

346

Idaho/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

Idaho/Transmission/Local Regulations Idaho/Transmission/Local Regulations < Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Local Siting Process The typical siting process for a transmission line in Idaho will fall to the local units of government in the form of local siting permits, because NIETCs are lacking within Idaho. Chapter 65, Title 67 of Idaho Code extends authority to the counties to include transmission corridors in their comprehensive plans and provides ordinance authority and processes for granting such permits. When the siting process falls to the county level,

347

Energy Transmission and Infrastructure  

SciTech Connect

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

348

Eastern Interconnection Planning Collaborative News Release  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). "We have taken a...

349

Series Transmission Line Transformer  

DOE Patents (OSTI)

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

350

EC Transmission Line Risk Identification and Analysis  

SciTech Connect

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

351

Video Transmission Jerkiness Measure.  

E-Print Network (OSTI)

??Digital video transmission is widely used nowadays in multimedia. Frame dropping, freeze and reduced number of frames in the transmitted video are common symptoms of… (more)

Abdelsamad, Deena

2013-01-01T23:59:59.000Z

352

NIST Transmission SEM  

Science Conference Proceedings (OSTI)

... As a result, more electrons will scatter, to provide the ... RR Keller, "Transmission EBSD in the Scanning Electron Microscope," Microscopy Today vol. ...

2013-07-29T23:59:59.000Z

353

Patterns of transmission investment  

E-Print Network (OSTI)

This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

Joskow, Paul L.

2005-01-01T23:59:59.000Z

354

Interactive Web-based mapping tool for energy zone planning launched [EVS  

NLE Websites -- All DOE Office Websites (Extended Search)

Interactive Web-based mapping tool for energy zone planning launched Interactive Web-based mapping tool for energy zone planning launched April 25, 2013 Argonne has launched a new, interactive, web-based tool, available at http://eispctools.anl.gov, for planning energy zones in the eastern United States as part of an Energy Zones Study for the Eastern Interconnection States' Planning Council (EISPC). The scope of the project includes the U.S. portion of the Eastern Interconnection, the electrical transmission grid covering 39 states in the eastern United States. The tool includes an extensive mapping library of energy resource and related information, interactive models to locate areas with high suitability for clean power generation, a variety of reports that can be run for user-specified regions, and a policy and incentives database.

355

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-70)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(8-89) memorandum DATE: 7/19/02 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-70) Bill Erickson - TFP/Walla Walla Natural Resource Specialist TO: Proposed Action: Vegetation Management on sections of the McNary-Ross, McNary-Horse Heaven, Horse Heaven-Harvarlum, Harvarlum-Big Eddy, and Hanford-John Day Transmission lines. The treatment areas are identified in Step 1 of the Planning Steps shown below. The work will involve the control of noxious weeds in the subject rights-of-ways (ROWs). Location: The ROWs are located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington, all being in the Walla Walla and Redmond Regions.

356

Abstract--Under the need for anticipatory efficient investment in transmission, several problems arise at the regulation and  

E-Print Network (OSTI)

electricity market. Index Terms--Transmission planning, transmission investment, regulation, additional lines1 Abstract--Under the need for anticipatory efficient investment in transmission, several problems transmission investments that existing generation and demand may be not willing to pay. This problem

Rudnick, Hugh

357

The progressive transmission disadvantage  

Science Conference Proceedings (OSTI)

The disadvantage of progressive transmission, compared to transmission in a single step, is analyzed for the high-rate case using a polytope that is self-similar under binary subdivision. This disadvantage is calculated to be 0.3424 dB or 0.057 bit compared ...

M. J. Durst

1997-01-01T23:59:59.000Z

358

Wholesale Power and Transmission Rate Projections 1993--2014 and Historical Wholesale Power Rates 1939--1992.  

SciTech Connect

This document provides a range of high, medium, and low case long-term projections of Bonneville Power Administration`s (BPA) wholesale power rates and a medium case long-term projection of BPA`s wheeling rates. These projections are produced annually by BPA. BPA uses these projections in long-term marketing, resource, transmission, and financial planning assessments. BPA`s projections also are used by public utility commissions, utilities, and others for a variety of planning purposes. The analysis used for these rate projections assumes that current rate making methodologies continue into the future and are further based on certain assumptions about regional loads, extra-regional markets, the costs of resources, BPA`s financial requirements, and the capability of the region`s power plants. While these projections are intended to address the overall uncertainty in rate levels, BPA realizes that the future will not reflect any specific set of assumptions. The rate projections in this document have been prepared prior to the Draft 1993 BPA Marketing Plan, the implementation of which is almost certain to push BPA away from any set of assumptions in this document. Therefore, this document can be thought of as representing the ``old`` BPA with its products and policies. It can be viewed as a starting point or reference point to measure the impact of the ``new`` BPA with its Marketing Plan, and the broader undertaking referred to as the Competitiveness Project.

US Bonneville Power Administration

1993-11-01T23:59:59.000Z

359

Abstract--Different regulatory frameworks have implemented competitive mechanisms to increase efficiency in transmission, a  

E-Print Network (OSTI)

of competition among electricity market agents [2]. The first issue to discuss in transmission planning should efficiency in transmission, a natural monopoly. Conflicts of interest and hidden costs make necessary to define methods to obtain an appropriate valuation of new transmission assets. This paper is the first one

Catholic University of Chile (Universidad Católica de Chile)

360

FOR ELECTRIC POWER TRANSMISSION  

E-Print Network (OSTI)

A contract network extends the concept of a contract path to address the problem of loop flow and congestion in electric power transmission systems. A contract network option provides a well defined, internally consistent framework for assigning long-term capacity rights to a complicated electric transmission network. The contract network respects the special conditions induced by Kirchoff's Laws; accommodates thermal, voltage and contingency constraints on transmission capacity; and can be adopted without disturbing existing methods for achieving an economic power dispatch subject to these constraints. By design, a contract network would maintain short-run efficiency through optimal spot price determination of transmission prices. Through payment of congestion rentals, the contract network makes a long-term capacityright holder indifferent between delivery of the power or receipt of payments in a settlement system. And the contract network framework can support allocation of transmission capacity rights through a competitive bidding process. CONTRACT NETWORKS

William W. Hogan; William W. Hogan

1990-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Nonlinear magnetoinductive transmission lines  

E-Print Network (OSTI)

Power transmission in one-dimensional nonlinear magnetic metamaterials driven at one end is investigated numerically and analytically in a wide frequency range. The nonlinear magnetic metamaterials are composed of varactor-loaded split-ring resonators which are coupled magnetically through their mutual inductances, forming thus a magnetoiductive transmission line. In the linear limit, significant power transmission along the array only appears for frequencies inside the linear magnetoinductive wave band. We present analytical, closed form solutions for the magnetoinductive waves transmitting the power in this regime, and their discrete frequency dispersion. When nonlinearity is important, more frequency bands with significant power transmission along the array may appear. In the equivalent circuit picture, the nonlinear magnetoiductive transmission line driven at one end by a relatively weak electromotive force, can be modeled by coupled resistive-inductive-capacitive (RLC) circuits with voltage-dependent cap...

Lazarides, Nikos; Tsironis, G P

2011-01-01T23:59:59.000Z

362

2009 National Electric Transmission Congestion Study - Las Vegas Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 National Electric Transmission Congestion Study - Las Vegas 2009 National Electric Transmission Congestion Study - Las Vegas Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop On August 6, 2008, DOE hosted a regional pre-study workshop in Las Vegas, NV to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda and full transcript available below. 8-06-08 Congestion Workshop Agenda - Las Vegas, NV.pdf Transcript - 2009 National Electric Transmission Congestion Study Las Vegas Workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2009 National Electric Transmission Congestion Study - Chicago Workshop 2012 National Electric Transmission Congestion Study - San Diego Workshop

363

Digital Offshore Cadastre (DOC) ? Pacific83 ? Planning Area...  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Area Outlines Ocean Data Tools Technical Guide Map Gallery Regional Planning Feedback Ocean You are here Data.gov Communities Ocean Data Digital Offshore Cadastre...

364

Marine Planning Portal Network Teaser | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Network Teaser Ocean Data Tools Technical Guide Map Gallery Regional Planning Feedback Ocean You are here Data.gov Communities Ocean Marine Planning Portal Network The...

365

Fossil-Fuel CO2 Emissions from Centrally Planned Asia  

NLE Websites -- All DOE Office Websites (Extended Search)

Centrally Planned Asia map Trends Centrally Planned Asia (CPA) includes Vietnam, North Korea (officially Democratic People's Republic of Korea), and Mongolia, but regional...

366

Security Plans  

Science Conference Proceedings (OSTI)

... Appendix A – Glossary - A glossary of security terms used within the security planning document. ... F, Glossary. None applicable.

2013-09-30T23:59:59.000Z

367

PYRAMID LAKE RENEWEABLE ENERGY PLAN  

DOE Green Energy (OSTI)

The Pyramid Lake Renewable Energy Plan covers these areas: energy potential (primarily focusing on geothermal resource potential, but also more generally addressing wind energy potential); renewable energy market potential; transmission system development; geothermal direct use potential; and business structures to accomplish the development objectives of the Pyramid Lake Paiute Tribe.

HIGH DESERT GEOCULTURE, LLC

2009-06-06T23:59:59.000Z

368

Multiple Use of Existing Transmission Corridors  

Science Conference Proceedings (OSTI)

Multiple use utility corridors can provide significant benefits for the utilities and the public. However, increasing the power flow in the power system can raise compatibility issues with other utilities or systems that share the corridor. This report provides case studies of three common corridors for which compatibility issues were raised as a result of planned increases in power transmission capacity. The case studies review the criteria used to evaluate compatibility and the need for mitigation meas...

2007-12-18T23:59:59.000Z

369

Definition: Advanced Transmission Applications | Open Energy Information  

Open Energy Info (EERE)

Applications Applications Jump to: navigation, search Dictionary.png Advanced Transmission Applications Software that utilizes synchrophasor information for real-time grid operations or planning and off-line analysis. These applications are aimed at providing wide-area situational awareness, grid monitoring, and detailed power system analysis and the improvement or validation of power system models.[1] Related Terms smart grid References ↑ https://www.smartgrid.gov/category/technology/advanced_transmission_applications [[C LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ategory: Smart Grid Definitionssustainability, |Template:BASEPAGENAME]]sustainability, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Advanced_Transmission_Applications&oldid=502495

370

EA-1508: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

508: Mitigation Action Plan 508: Mitigation Action Plan EA-1508: Mitigation Action Plan Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld Counties, Colorado This is the mitigation action plan (MAP) for use during construction of the Beaver Creek-Hoyt-Erie transmission line upgrades, including right-of ways (ROWS), hydrology, vegetation, construction debris and dewatering, landscape engineering, borrow pits and recommended procedures for Raptors and powerline construction. Mitigation Action Plan to Implement Mitigation Requirements for Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld Counties, Colorado November 2005 More Documents & Publications EA-1617: Mitigation Action Plan EA-1456: Mitigation Action Plan EA-1611: Mitigation Action Plan

371

EIS-0474: Southline Transmission Project, Arizona and New Mexico |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Southline Transmission Project, Arizona and New Mexico 4: Southline Transmission Project, Arizona and New Mexico EIS-0474: Southline Transmission Project, Arizona and New Mexico Summary The Department of the Interior's Bureau of Land Management (BLM) and Department of Energy's Western Area Power Administration (Western) are preparing this EIS as joint lead agencies to evaluate the environmental impacts of the proposed Southline Transmission Project and address associated potential land use plan amendments. The project would consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to approximately 130 miles of existing transmission lines between the Apache and Saguaro, Arizona substations. Project website: http://www.blm.gov/nm/southline.

372

(DOE/EIS-0285/SA-82): Supplemental Analysis for Transmission System Vegetation Management Program FEIS (August 13, 2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3,2002 3,2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-82 Jeffrey Hathhorn Redmond Deputy Regional Manager - TFI/IDAHO FALLS Proposed Action: Vegetation Management for twenty-four Substations in the Burley District. See list of facilities under planning step 1). Location: See list of facilities under Planning Step 1. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Burley District of the Idaho Falls Region. Analysis: The attached checklist shows the resources that were found during this analysis and what

373

Power Contracts - Sierra Nevada Region (SNR) - Western Area Power...  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Operations Outage Coordination Standards of Conduct Transmission Planning You are here: SN Home page > Power Operations > Outage Coordination Outage Coordination Outage...

374

EA-1591: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

91: Mitigation Action Plan 91: Mitigation Action Plan EA-1591: Mitigation Action Plan Palisades-Goshen Transmission Line Reconstruction Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Palisades-Goshen Transmission Line Reconstruction Project. The project involves reconstruction of the existing Palisades-Goshen 115-kV transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. Mitigation Action Plan for the Palisades-Goshen Transmission Line Reconstruction Project More Documents & Publications EA-1591: Final Environmental Assessment, Finding of No Significant Impact, and Mitigation Action Plan EA-1591: Finding of No Significant Impact

375

STRATEGIC PLANNING  

E-Print Network (OSTI)

The National Academy of Public Administration is an independent, nonprofit organization chartered by Congress to improve governance at all levels—local, regional, state, national, and international. The Academy’s membership of more than 550 Fellows includes current and former members of Congress, cabinet-level appointees, senior federal executives, state and local practitioners, businesspeople, nonprofit leaders, and scholars with distinguished records in public management. Since its establishment in 1967, the Academy has assisted hundreds of federal agencies, congressional committees, state and local governments, civic organizations, and institutions overseas through problemsolving, research, analysis, information sharing, developing strategies for change, and connecting people and ideas. Most reports and papers issued by Academy panels respond to specific requests and needs of public agencies. Projects also address governmentwide and broader societal topics identified by the Academy. In addition to government institutions, the Academy is also supported by businesses, foundations, and nonprofit organizations. A Final Report by a Panel of the NATIONAL ACADEMY OF PUBLIC ADMINISTRATION for the Office of Strategic Planning

Hale Champion; Mary Jane England; Harry Hatry

2001-01-01T23:59:59.000Z

376

Electric Transmission Lines (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

377

Down hole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

2007-07-24T23:59:59.000Z

378

Downhole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

2008-01-15T23:59:59.000Z

379

Transmission Electron Microscopy (TEM)  

Science Conference Proceedings (OSTI)

...Transmission electron microcopy (TEM) has been used since the 1950s to obtain very high resolution images of microstructures. As TEMs were enhanced to include features such as digitally scanned point beams and energy dispersive x-ray detectors

380

Cloud Transmissivities for Canada  

Science Conference Proceedings (OSTI)

Transmissivities are determined for different cloud types using nine years of hourly irradiance measurements under overcast skies at six Canadian stations. Values for individual stations and for pooled data using irradiances uncorrected for ...

J. A. Davies; M. Abdel-Wahab; J. E. Howard

1985-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Drought Planning and State Government: Current Status  

Science Conference Proceedings (OSTI)

Recent droughts, calls for action by regional, national, and international organizations, and the availability of model plans have stimulated considerable activity in the development of drought contingency plans by state government in the United ...

Donald A. Wilhite

1991-10-01T23:59:59.000Z

382

Optimal Planning of a Weather Radar Network  

Science Conference Proceedings (OSTI)

An approach to the optimal planning of a weather radar network is presented. In the approach, several aspects affecting the planning decision, including terrain blockage, the need to measure with two Doppler weather radars in some regions, and ...

R. Minciardi; R. Sacile; F. Siccardi

2003-09-01T23:59:59.000Z

383

Transmission Line Grounding  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) published a comprehensive grounding report. Published in two parts, the report covered the theoretical and practical aspects of transmission line grounding practices. To further improve the tools available for grounding analysis, an investigation into practical ways to calculate the fault current distribution and ground potential rise of the transmission line grounding system was conducted. Furthermore, a survey of utilities has documented industry pr...

2011-12-23T23:59:59.000Z

384

Transmission Right Of Way  

NLE Websites -- All DOE Office Websites (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

385

Assumptions to the Annual Energy Outlook - Natural Gas Transmission and  

Gasoline and Diesel Fuel Update (EIA)

Natural Gas Transmission and Distribution Module Natural Gas Transmission and Distribution Module Assumption to the Annual Energy Outlook Natural Gas Transmission and Distribution Module Figure 8. Natural Gas Transmission and Distribution Model Regions. Having problems, call our National Energy Information Center at 202-586-8800 for help. The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each forecast year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution

386

Renewable Energy Transmission Initiative Phase 1A  

E-Print Network (OSTI)

94597 Tel: (913) 458-2000 www.bv.com #12;Principal Investigators: Ryan Pletka, Project Manager Andy Potential in RETI Study region. ......... 6-23 Table 6-11. Candidate LFG Projects (3 MW and Greater information to be used in Phase 1B of the California Renewable Energy Transmission Initiative project. 1

387

Definition: Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Jump to: navigation, search Dictionary.png Transmission An interconnected group of lines and associated equipment for the movement or transfer of electric energy...

388

Transmission/Resource Library/GIS Tools | Open Energy Information  

Open Energy Info (EERE)

Transmission/Resource Library/GIS Tools Transmission/Resource Library/GIS Tools < Transmission‎ | Resource Library Jump to: navigation, search ResourceLibraryHeader.png Planning Public Involvement GIS Tools and Maps Environmental Resources and Mitigation NEPA MOUs General Transmission Documents Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database ACEII.jpg ACE-II: Areas of Conservation Emphasis Provides an easily-accessible and standardized way to view the best available statewide data on California's biological richness and biodiversity CAPS.jpg CAPS: Crucial Areas Planning System Online tool that maps crucial habitat as well as key wildlife connectivity areas in Montana. The aim of the mapping system is to consider fish,

389

Arizona/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

Regulations Regulations < Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Local Siting Process A CEC granted by the TLSC must be in compliance with all applicable ordinances, master plans and regulations of the state, a county or an incorporated city or town in which a facility will be located.[1] [This is subject to the power to grant a CEC "notwithstanding any such ordinance, master plan or regulation, exclusive of franchises, if the committee finds as a fact that compliance with such ordinance, master plan or regulation is

390

Advanced Planning Method for Integrating Large-Scale Variable Generation  

Science Conference Proceedings (OSTI)

As the penetration and size of renewable generation resources increase, the industry must expand transmission infrastructure to accommodate increasing renewable resource output. Conventional transmission expansion planning requires sufficient transmission capacities to transfer the full name plate capacity of all power plants to load centers at the same time. However, renewable resources, such as wind and solar, have highly variable output and are spatially diversified. Thus, transmission expansion plann...

2009-12-22T23:59:59.000Z

391

Task Plans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Task Plans Task Plans This page contains links to a tentative listing of active and closed TEC Task Plans. Final status of these task plans will be determined after the July 2000 TEC meeting. Task Plan Number/Title DOE Lead Staff Last Update Comment Status/ New No. After 7/27/00 GP-1, Section 180(c) Coordination (begun 1/96) C. Macaluso 7/98 DOE published a Revised Proposed Policy and Procedures in April 1998; no final policy will be issued until a definitive date for NWPA shipments is determined, based on site suitability or other legislative direction. To the extent that any issues related to Section 180(c) arise in TEC meetings, they are being discussed in the context of the consolidated grant topic group which is covered by another task plan. Closed

392

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

ColoradoTransmissionAgencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary...

393

Decommissioning Planning  

Science Conference Proceedings (OSTI)

The purpose of this EPRI Technical Report is to provide a series of pre-planning guidance documents for the decommissioning of a nuclear power plant. This guidance is based in part upon Nuclear Decommissioning Plans (NDPs) developed by Commonwealth Edison (now Exelon) following the premature closure of Zion Station in 1998 as well as from other industry references and experience. These NDPs focus on the planning activities over the period from prior to final shutdown through the transition period into de...

2006-11-15T23:59:59.000Z

394

Management Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Plan (SSMP) to be submitted to Congress after the April 2010 release of the Nuclear Posture Review Report. It is aligned with the President's National Security Strategy...

395

Emergency Plans  

Science Conference Proceedings (OSTI)

... Early Dismissal (Early Closing) – Due to Inclement Weather - Snow/Ice or Emergency Situation. ... Emergency Situation - "Shelter-in-Place" Plan. ...

2013-02-18T23:59:59.000Z

396

DOE/EIS-0285-SA-136: Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Oregon City-Chemawal 1&2 (4/1/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6- Oregon City-Chemawa1&2) 6- Oregon City-Chemawa1&2) Mark Newbill Natural Resource Specialist- TFE/Chemawa Proposed Action: Vegetation Management for the Oregon City-Chemawa #1 and #2 115 kV transmission lines from Oregon City Substation to Chemawa Substation. Location: The project is located in the BPA Eugene Region, Washington and Marion Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that

397

Electricity Transmission, A Primer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

398

Y-12 Site Sustainability Plan  

SciTech Connect

This plan addresses: Greenhouse Gas Reduction and Comprehensive Greenhouse Gas Inventory; Buildings, ESPC Initiative Schedule, and Regional and Local Planning; Fleet Management; Water Use Efficiency and Management; Pollution Prevention and Waste Reduction; Sustainable Acquisition; Electronic Stewardship and Data Centers; Renewable Energy; Climate Change; and Budget and Funding.

none,; Erhart, S C; Spencer, C G

2013-12-01T23:59:59.000Z

399

DOE/EIS-0332: Mitigation Action Plan for th eMcNary-John Day...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

McNary-John Day Transmission Line Project This Mitigation Action Plan (MAP) is for the McNary-John Day Transmission Line Project, which involves construction and operation of a new...

400

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

402

Merchant Transmission Investment  

E-Print Network (OSTI)

merchant transmission model of the type described above, though Australia has adopted a mixed merchant and regu- 6 lated transmission model.3 However, recent academic proposals,4 as well as FERC’s July 2002 Standard Market Design (SMD) proposals, call... that a nodal or locational marginal pricing (LMP) system is in place with attributes similar to those being proposed by the U.S. Federal Energy Regulatory Commission (FERC) in its SMD proposals and to what is in operation in New 3Two merchant lines...

Joskow, Paul; Tirole, Jean

2004-06-16T23:59:59.000Z

403

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

404

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

405

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission lines between two adjacent periodic intersections to be longer than the other. 5 figs.

Ikezi, Hiroyuki; Lin-Liu, Yuh-Ren; deGrassie, J.S.

1990-03-02T23:59:59.000Z

406

Trends In U.S. Electric Power Transmission  

SciTech Connect

The report provides an overview of the changes that are occurring in the industry to implement the goals of improved reliability and reduced congestion costs. As the electric industry works to become a more efficient market, transmission stands as a key link between the competitive generation and the regulated distribution sectors. In this role as a key link, transmission is a major focus of government efforts to improve reliability and reduce congestion costs. The scope of the report is to analyze the dominant reliability, investment, siting, and competition/open access trends that are occurring in the domestic electric transmission industry. Topics covered include: the impact of the 2003 Northeast blackout on reliability rules; the move from voluntary to mandatory reliability standards; the advent of real-time transmission system monitoring; ISO/RTO efforts to improve system reliability; the drivers of government intervention in transmission investment; the move towards incentive-based rates for transmission investment; legislative and regulatory efforts to spur transmission investment to support renewable energy resources; the emergence of merchant transmission; the need for federal backstop authority on regional transmission projects; the designation of national interest electric transmission corridors; FERC Orders on siting transmission; the need for changes in open access and competition regulations; FERC efforts to increase open access and competition; legislative efforts to increase competition; and, current competitive issues in the industry.

NONE

2007-11-15T23:59:59.000Z

407

Broadband Water Vapor Transmission Functions for Atmospheric IR Flux Computations  

Science Conference Proceedings (OSTI)

Transmission functions associated with water vapor molecular line and e-type absorption in the IR spectral regions are presented in the form of simple analytical functions and small tables, from which atmospheric IR fluxes and cooling rates can ...

Ming-Dah Chou

1984-05-01T23:59:59.000Z

408

2012 National Electric Transmission Congestion Study - San Diego...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

San Diego Workshop 2012 National Electric Transmission Congestion Study - San Diego Workshop On December 15, 2011, DOE hosted a regional pre-study workshop in San Diego, CA to...

409

2012 National Electric Transmission Congestion Study- San Diego Workshop  

Energy.gov (U.S. Department of Energy (DOE))

On December 15, 2011, DOE hosted a regional pre-study workshop in San Diego, CA to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. The workshop...

410

(DOE/EIS-0285/SA-08): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/23/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23, 2001 23, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-08 Don Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Clearing C-trees along the south side of the right-of-way. Location: Raver - Covington Line 1, between towers 6/5 and 7/2. Work will be performed in the State of Washington. Proposed by: BPA Snohomish Region. Analysis: This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). Planning Steps 1. Identify facility and the vegetation management need. The project involves controlling all tall growing trees (C-Trees) within the right-of-way. All

411

(DOE/EIS-0285/SA-12): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2) 2) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Olympia-Grand Coulee No.1 Transmission Line ROW. Location: The ROW is located in Pierce and King Counties, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the

412

(DOE/EIS-0285/SA-10): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 5/15/01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0) 0) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Covington-Duwamish No. 1 ROW from the Covington Substation to tower 10/4. Location: The ROW is located in King County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to

413

USLCI Interconnect Region Electricity datasets, 2008 Datasets...  

Open Energy Info (EERE)

spreadsheet are also included.

Datasets include generation and transmission of electricity for each of the interconnect regions.  It is representative of the year...

414

Western Area Power Administration, Desert Southwest Region  

NLE Websites -- All DOE Office Websites (Extended Search)

5 Western Area Power Administration, Desert Southwest Region Liberty-Parker 2 230-kV Transmission Line Optical Power Ground Wire Repairs - Continuation Sheet Project Description...

415

NWCC Transmission Case Study Conclusions Summary  

DOE Green Energy (OSTI)

OAK-B135 The NWCC Transmission Case Studies Conclusions Summary In the spring of 1999, the Utility Wind Interest Group (UWIG), with the cooperation of the National Wind Coordinating Committee (NWCC), conducted a forum on transmission issues associated with the production of energy from wind. As a result of this forum, a number of issues were identified which, if successfully resolved, could help reduce barriers to the future expansion of wind power. The NWCC, being a multi-stakeholder group, was in an ideal position to conduct follow-up activities among a cross-section of the interested parties. The follow-up activities took the form of three case studies in the areas of interest identified by forum participants: (1) Transmission policy and pricing; (2) ''Virtual wheeling'' arrangements; and, (3) Transmission system improvements. The case studies provide an interesting snapshot in time dealing with a range of issues associated with scheduled or planned regulatory and restructuring proceedings related to energy transmission. The NWCC Transmission Subcommittee and the UWIG reviewed early drafts of the case studies in November 1999. The case studies were conducted through a questionnaire and interview process with interested parties. In writing each case study, NWCC staff attempted to identify all stakeholder groups with an interest in each topic and solicit their input. While all parties do not agree on every issue presented, a serious effort has been made to present all views in an unbiased fashion. At the end of each case study, relevant conclusions are drawn and recommendations for next steps are provided where appropriate.

Steve Wiese, Terry Allison

2000-09-01T23:59:59.000Z

416

A multilayer grating with a novel layer structure for a flat-field spectrograph attached to transmission electron microscopes in energy region of 2-4 keV  

SciTech Connect

A multilayer mirror with a novel layer structure to uniformly enhance the reflectivity in a few keV energy range at a fixed angle of incidence is invented and applied to a multilayer grating for use in a flat-field spectrograph attached to a conventional electron microscope. The diffraction efficiency of the fabricated multilayer grating having the new layer structure is evaluated at the angle of incidence of 88.65 deg. in the energy region of 2.1-4.0 keV. It is shown that the multilayer grating is effective to uniformly enhance the diffraction efficiency and able to be practically used in this energy region.

Imazono, T.; Koike, M.; Koeda, M.; Nagano, T.; Sasai, H.; Oue, Y.; Yonezawa, Z.; Kuramoto, S.; Terauchi, M.; Takahashi, H.; Handa, N.; Murano, T. [QuBS, Japan Atomic Energy Agency (JAEA), 8-1-7 Umemidai, Kizugawa, Kyoto 619-0215 (Japan); Device Dept., Shimadzu Corp., 1 Nishinokyo-Kuwabarcho, Nakagyo-ku, Kyoto 604-8511 (Japan); IMRAM, Tohoku University, 2-1-1 Katahira, Aoba-ku, Sendai 980-8577 (Japan); EC Business Unit, JEOL Ltd., 3-1-2 Musashino, Akishima, Tokyo 196-8558 (Japan)

2012-05-17T23:59:59.000Z

417

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

1993-01-01T23:59:59.000Z

418

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

419

Transmission SEAB Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

420

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Omega Transmission Lines  

E-Print Network (OSTI)

In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

Vehmas, Joni

2013-01-01T23:59:59.000Z

422

LAP Transmission Rate  

NLE Websites -- All DOE Office Websites (Extended Search)

LAP Transmission Rate 4.50 4.00 3.82 3.50 3.00 of 2.50 c 0 2.I2 2.68 I 3: 2.00 1.50 1.00 0.50 0.00 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012...

423

Transmission Services J7000  

NLE Websites -- All DOE Office Websites (Extended Search)

C T D E S E R T S O U T H W E S T R E G I O N R O C K Y M O U N T A I N R E G I O N Transmission Services J7000 Ensuring the Reliability of the Bulk Electric System Western's...

424

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

Kotlyar, O.M.

1997-03-25T23:59:59.000Z

425

Transmission Enhancement Technology Report  

E-Print Network (OSTI)

to increase transmission capability. Section 3 documents existing technologies used in the industry today the traditional types of design alternatives used by Western and the electric industry. The primary system operate at three times the ampacity of Aluminum Conductor Steel Reinforced (ACSR) conductor and has a much

426

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. The Office of Electricity Delivery and Energy Reliability (OE) is...

427

GRIPS Plan  

DOE Green Energy (OSTI)

The GRIPS (Geothermal Resources Impact Projection Study) Commission was established by a Joint Powers Agreement between the California Counties of Lake, Mendocino, Napa, and Sonoma. The objectives of GRIPS are primarily to develop and use a cooperative environmental data collection and use system including natural, social, and economic considerations to facilitate their independent decisions and those of State and Federal agencies related to the environmental effects of geothermal development. This GRIPS Plan was prepared from a wide range of studies, workshops, and staff analyses. The plan is presented in four parts: summary and introduction; environmental data status report; planned programs; and budget. (MHR)

Not Available

1978-07-31T23:59:59.000Z

428

Colorado/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission < Colorado Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Colorado is part of the Western Interconnection power grid, which covers most of the western United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the

429

Wind Energy Transmission | Open Energy Information  

Open Energy Info (EERE)

Wind Energy Transmission Wind Energy Transmission Jump to: navigation, search Just a few years ago, 5% wind energy penetration in the United States was a lofty goal. In Europe, however, some countries have already reached wind energy penetrations of 10% or higher in a short period of time. The growth of domestic wind generation over the past decade has sharpened the focus on two questions: Can the electrical grid accommodate very high amounts of wind energy without jeopardizing security or degrading reliability? And, given that the nation's current transmission infrastructure is already constraining further development of wind generation in some regions, how could significantly larger amounts of wind energy be developed? The answers to these questions could hold the keys to determining how much of a role

430

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

page intentionally left blank page intentionally left blank 129 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2011 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the pattern in the previous year, coupled

431

2012 National Electric Transmission Congestion Study - Philadelphia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Philadelphia Philadelphia Workshop 2012 National Electric Transmission Congestion Study - Philadelphia Workshop On December 6, 2011, DOE hosted a regional pre-study workshop in Philadelphia, PA to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below. National Electric Transmission Congestion Study 2012 Eastern Workshops.pdf 12-06-11 Congestion Workshop Agenda - Philadelphia (final).pdf Introduction by David Meyer, DOE.pdf Presentation by Edward Finley, NCUC.pdf Presentation by Betty Ann Kane, DC PSC.pdf Presentation by Robert Bradish, American Electric Power.pdf Presentation by John Buechler, NYISO.pdf Presentation by Jim Busbin, Southern Company.pdf

432

Arizona/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Arizona/Transmission < Arizona Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Arizona is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including Arizona. WECC

433

Natural Gas Transmission and Distribution Module This  

Gasoline and Diesel Fuel Update (EIA)

This This page inTenTionally lefT blank 127 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2012 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through a regional interstate representative pipeline network, for both a peak (December through March) and off-peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the

434

Montana/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Montana/Transmission < Montana Jump to: navigation, search MontanaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Montana is part of both the Eastern and Western Interconnection power grids and is part of two NERC regions - the Midwest Reliability Organization (MRO) and Western Electricity Coordinating Council (WECC). MRO's service territory extends from the state of Nebraska north to

435

Nevada/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Nevada/Transmission < Nevada Jump to: navigation, search NevadaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Nevada is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). WECC is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in Nevada.

436

Eastern Interconnection Planning Collaborative News Release | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release Eastern Interconnection Planning Collaborative News Release The Eastern Interconnection Planning Collaborative (EIPC) today announced that its diverse array of stakeholders has reached consensus on the final set of "resource expansion futures" to be studied as part of the electric system transmission planning effort funded by the U.S. Department of Energy (DOE). Eastern Interconnection Planning Collaborative News Release More Documents & Publications Electricity Advisory Committee Meeting Presentations October 2011 - Interconnection-Wide Transmission Planning Processes EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning - June 6, 2013 Application to Export Electric Energy OE Docket No. EA-352 NaturEner Tie

437

EIS-0128: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: Mitigation Action Plan : Mitigation Action Plan EIS-0128: Mitigation Action Plan Los Banos - Gates (Path 15) Transmission Project, Revision 2 Revision 2: This MAP addresses the construction, operation, and maintenance of the new 84-mile long 500-kV transmission line. Necessary work conducted by Pacific Gas and Electric (PG&E) at their substations will occur within the previously disturbed area inside the substation boundaries. Western or Trans Electric, Inc. will also not have a role in upgrading the various existing PG&E 230-kV system components. DOE-0128-MAP-02, Western Area Power Administration, Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project, Revision 2 (December 2003) More Documents & Publications EIS-0128: Mitigation Action Plan EA-1456: Mitigation Action Plan

438

EIS-0128: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28: Mitigation Action Plan 28: Mitigation Action Plan EIS-0128: Mitigation Action Plan Los Banos - Gates (Path 15) Transmission Project, Revision 2 Revision 2: This MAP addresses the construction, operation, and maintenance of the new 84-mile long 500-kV transmission line. Necessary work conducted by Pacific Gas and Electric (PG&E) at their substations will occur within the previously disturbed area inside the substation boundaries. Western or Trans Electric, Inc. will also not have a role in upgrading the various existing PG&E 230-kV system components. DOE-0128-MAP-02, Western Area Power Administration, Mitigation Action Plan for Los Banos - Gates (Path 15) Transmission Project, Revision 2 (December 2003) More Documents & Publications EIS-0128: Mitigation Action Plan EA-1456: Mitigation Action Plan

439

Test plan  

U.S. Energy Information Administration (EIA)

3.0 TEST PLAN METHODOLOGY 8. 3.1 Assumptions 8. 3.2 Methodology 8. 4.0 COMMENTS ON INITIAL VIEW OF THE DATA 16 1.0 INTRODUCTION. EIA tasked Allied ...

440

> PAPER FOR THE SPECIAL SECTION ON TRANSMISSION INVESTMENT, PRICING AND CONSTRUCTION < 1 Abstract--From an economic perspective, the appropriate  

E-Print Network (OSTI)

the impacts of an electricity transmission project on different players may vary, such side payments a multi-stage game-theoretic framework for electricity transmission investment as a new planning paradigm> PAPER FOR THE SPECIAL SECTION ON TRANSMISSION INVESTMENT, PRICING AND CONSTRUCTION

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Energy Organizational Planning  

SciTech Connect

As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty – control and manage their natural resource assets – i.e. develop its own energy resources, meet the current and projected energy needs of their community, and “sit at the table” with other regional energy providers to deal with issues on a peer-to-peer basis.

Gina C. Paradis; James Yockey; Tracey LeBeau

2009-04-17T23:59:59.000Z

442

Grid Expansion Planning for Carbon Emissions Reduction  

SciTech Connect

There is a need to upgrade and expand electric power transmission and generation to meet specified renewable energy targets and simultaneously minimize construction cost and carbon emissions. Some challenges are: (1) Renewable energy sources have variable production capacity; (2) Deficiency of transmission capacity at desirable renewable generation locations; (3) Need to incorporate models of operations into planning studies; and (4) Prevent undesirable operational outcomes such as negative dispatch prices or curtailment of carbon neutral generation.

Bent, Russell W. [Los Alamos National Laboratory; Toole, Gasper L. [Los Alamos National Laboratory

2012-07-18T23:59:59.000Z

443

Transmission Developers Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

444

Transmission Siting_071508.indd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

445

Drill string transmission line  

DOE Patents (OSTI)

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

446

Guidebook on Advanced Transmission Reliability Assessment and Planning  

Science Conference Proceedings (OSTI)

Major blackouts are usually the outcome of uncontrolled cascades of line and generator outages. Analyses of the 2003 Northeast Blackout150and of every major blackout since implementation of the Federal Energy Regulatory Commission (FERC) Open Access Orders 888 and 889 in 1996150have concluded that system operators likely could have mitigated the extent and damage of the blackout. However, such mitigation could occur only if operators had access to real-time software tools that identified the impending cr...

2009-12-07T23:59:59.000Z

447

Security-constrained transmission planning: A mixed-integer ...  

E-Print Network (OSTI)

discusses results for a real-world case study; in section V we present the .... by most Brazilian utilities (AC power flow, contingency analysis, equivalent network  ...

448

A Smarter Transmission Grid  

Science Conference Proceedings (OSTI)

Our modern transmission grid transports bulk power over long distances and across many provincial boundaries, but ever-increasing energy demands are significantly transforming it. Worldwide, many catalysts are driving this transformation, including emerging supply- and demand-side technologies, cyber security concerns, and aging infrastructures, to name just a few. As the grid transforms and more grid-connected renewable resources complicate reliability, it will be increasingly difficult to meet its futu...

2010-12-31T23:59:59.000Z

449

Transmission Price Risk Management  

Science Conference Proceedings (OSTI)

This report is concerned with the financial risks that arise from the uncertain price of transmission service in restructured or competitive electricity markets. These risks are most severe in markets with locational pricing (LMP), but they also exist in more traditionally organized electricity markets. This report has two main purposes. The first is to review the existing mathematical models of electricity price formation in spot and forward markets that may be helpful as the foundations for developing ...

2006-12-04T23:59:59.000Z

450

Green Transmission Efficiency Initiative  

Science Conference Proceedings (OSTI)

As a consequence of escalating interest in the environment and climate changea national focus on energy efficiency, and growing electricity demandthe time is right to assess energy efficiency from both an end-use perspective as well as across the utility value chain, from generation, to transmission, to distribution. The reduction of our carbon footprint and increasing the role of renewable energy are an important part of the strategy for the greening for electric energy supply. As a result, efficient po...

2009-07-31T23:59:59.000Z

451

Transmission Management in the Aftermath of Electricity Restructuring in Turkey  

Science Conference Proceedings (OSTI)

In moving toward restructuring, transmission expansion planning is a major challenge. The authors offer a general perspective on TEP issues, then address the specific challenges in Turkey and propose several strategies toward managing physical and financial risks in that country. (author)

Tor, Osman Bulent; Shahidehpour, Mohammad

2006-08-15T23:59:59.000Z

452

CFN Ops Plan | Work Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Plan Operations Plan Work Planning & Control for Experiments and Operations All experimental work will be conducted in accordance with Work Planning and Control for Experiments and Operations, which ensures proper design and operation of all experiments prior to their commencement. CFN will use the SBMS provided standard form for the formal documentation. The Lead Experimenter/Responsible person will notify the Experimental Safety Review Committee of any new experiments or modifications to existing experiments. CFN will appoint an Experimental Safety Review Committee. This committee will consist of the Experiment Review Coordinator, CFN personnel, Facility Support Representative (FSR), Environmental Compliance Representative (ECR). Additional subject matter experts may be appointed on an ad-hoc

453

Regulations for Gas Transmission Lines Less than Ten Miles Long (New York)  

Energy.gov (U.S. Department of Energy (DOE))

Any person who wishes to construct a gas transmission line that is less than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of...

454

A mechanistic approach for accurate simulation of village scale malaria transmission  

E-Print Network (OSTI)

Background: Malaria transmission models commonly incorporate spatial environmental and climate variability for making regional predictions of disease risk. However, a mismatch of these models' typical spatial resolutions ...

Duchemin, Jean-Bernard

455

Definition: Regional Reliability Plan | Open Energy Information  

Open Energy Info (EERE)

reliability Coordinator References Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline...

456

Integrating transportation conservation with regional conservation planning  

E-Print Network (OSTI)

and Wildlife Biologist/Transportation Liaison, U.S. Fish andChapter Integrating Transportation and Resource Conservationon the integration of transportation conservation with the

DiGregoria, John; Luciani, Emilie; Wynn, Susan

2005-01-01T23:59:59.000Z

457

Electricity Transmission and Distribution Technologies ...  

Electricity Transmission and Distribution Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research ...

458

WestConnect Transmission Product  

NLE Websites -- All DOE Office Websites (Extended Search)

WestConnect Transmission Product Federal Register Notices Customer Notifications Customer Comments Approved Rate Order FERC Confirmation...

459

Transmission eigenvalues for elliptic operators  

E-Print Network (OSTI)

A reduction of the transmission eigenvalue problem for multiplicative sign-definite perturbations of elliptic operators with constant coefficients to an eigenvalue problem for a non-selfadjoint compact operator is given. Sufficient conditions for the existence of transmission eigenvalues and completeness of generalized eigenstates for the transmission eigenvalue problem are derived. In the trace class case, the generic existence of transmission eigenvalues is established.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

2010-07-03T23:59:59.000Z

460

Alaska Strategic Energy Plan and Planning Handbook | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook The Alaska Strategic Energy Plan and Planning Handbook, published by the...

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Definition: Blackstart Capability Plan | Open Energy Information  

Open Energy Info (EERE)

Blackstart Capability Plan Blackstart Capability Plan Jump to: navigation, search Dictionary.png Blackstart Capability Plan A documented procedure for a generating unit or station to go from a shutdown condition to an operating condition delivering electric power without assistance from the electric system. This procedure is only a portion of an overall system restoration plan.[1] View on Wikipedia Wikipedia Definition A black start is the process of restoring a power station to operation without relying on the external electric power transmission network. Normally, the electric power used within the plant is provided from the station's own generators. If all of the plant's main generators are shut down, station service power is provided by drawing power from the grid through the plant's transmission line. However, during a wide-area

462

EA-1731: Mitigation Acton Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1: Mitigation Acton Plan 1: Mitigation Acton Plan EA-1731: Mitigation Acton Plan Walla Walla-Tucannon River Transmission Line Rebuild Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Walla Walla-Tucannon River Transmission Line Rebuild Project (Proposed Action). The Proposed Action involves rebuilding the 47-mile-long 115-kilovolt (kV) transmission line from the existing Walla Walla Substation, located in the city of Walla Walla, Washington, to the existing Tucannon River Substation, located near the town of Dayton, Washington. Walla Walla-Tucannon River Transmission Line Rebuild Project, DOE/EA-1731, (May 2011) More Documents & Publications EA-1731: Finding of No Significant Impact EA-1731: Final Environmental Assessment

463

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 2011) January 2011) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

464

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OCTOBER 2010) OCTOBER 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

465

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 7.1 (May 2012 second revision) Chapter 7.1 (May 2012 second revision) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

466

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-Chapter 7.1 (May 2012) -Chapter 7.1 (May 2012) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

467

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PLANNING PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 6 Competition Requirements 4. FAR Part 7 Acquisition Planning 5. FAR Part 8 Required Sources of Supply 6. FAR Part 9 Contractor Qualifications 7. FAR Part 10 Market Research 8. FAR Part 11 Describing Agency Needs 9. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 10. FAR Subpart 16.1 Selecting Contract Types 11. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 12. FAR 17 Special Contracting Methods 13. FAR Part 19 Small Business Programs 14. FAR 25.802(a)(2) Other International Agreements and Coordination 15. FAR 34.004 Acquisition Strategy

468

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Regulatory Commission (FERC). 2008. “Order on TechnicalEnergy Regulatory Commission (FERC). 2007. “Preventing UndueCommittee (NWCC). 2007. FERC Order 890: What Does It Mean

Mills, Andrew D.

2009-01-01T23:59:59.000Z

469

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

connection costs associated with renewable energy in Europerenewable energy zones (CREZs), for instance, estimated the costand costs for renewables electricity grid connection: Examples in Europe. Renewable Energy

Mills, Andrew D.

2009-01-01T23:59:59.000Z

470

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

policies will drive an increasing demand for renewable energy, which in most areas is projected to come from wind

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

471

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

wind power in a carbon constrained world. Energy Policy 34,wind energy: modeling the competition between gas turbines and compressed air energy storage for supplemental generation. Energy Policy

Mills, Andrew D.

2009-01-01T23:59:59.000Z

472

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Story So Far. National Renewable Energy Laboratory. NREL/Colorado: National Renewable Energy Laboratory. http://Examples in Europe. Renewable Energy 33, no. 8 (August):

Mills, Andrew D.

2009-01-01T23:59:59.000Z

473

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

2008. 20% Wind Energy by 2030: Increasing Wind Energy'sfor 40 GW of new wind by 2030, 50% higher than our median20% wind electricity by 2030 (AEP 2007), as specified in the

Mills, Andrew D.

2009-01-01T23:59:59.000Z

474

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

Industry. Prepared for Edison Electric Institute. WashingtonOctober. Southern California Edison Company (SCE). 2006. SCESouthern California Edison (SCE) IOU November 2006 SCE

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

475

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

and R. H. Socolow. 2007. Baseload wind energy: modeling theand S. Zhang.1998. Large-scale baseload wind power in China.

Mills, Andrew D.

2009-01-01T23:59:59.000Z

476

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

pdf/0554(2008).pdf European Wind Energy Association (EWEA).Large Scale Integration of Wind Energy in the European PowerPrepared by the European Wind Energy Association. http://

Mills, Andrew D.

2009-01-01T23:59:59.000Z

477

Property:Plants with Unknown Planned Capacity | Open Energy Information  

Open Energy Info (EERE)

Plants with Unknown Planned Capacity Plants with Unknown Planned Capacity Jump to: navigation, search Property Name Plants with Unknown Planned Capacity Property Type String Description Number of plants with unknown planned capacity per GEA Pages using the property "Plants with Unknown Planned Capacity" Showing 21 pages using this property. A Alaska Geothermal Region + 1 + C Cascades Geothermal Region + 2 + Central Nevada Seismic Zone Geothermal Region + 9 + G Gulf of California Rift Zone Geothermal Region + 4 + H Hawaii Geothermal Region + 0 + Holocene Magmatic Geothermal Region + 0 + I Idaho Batholith Geothermal Region + 1 + N Northern Basin and Range Geothermal Region + 11 + Northern Rockies Geothermal Region + 0 + Northwest Basin and Range Geothermal Region + 9 + R Rio Grande Rift Geothermal Region + 1 +

478

2012 National Electric Transmission Congestion Study: Presentation from  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Electric Transmission Congestion Study: Presentation National Electric Transmission Congestion Study: Presentation from Congestion Study Webinar Series 2012 National Electric Transmission Congestion Study: Presentation from Congestion Study Webinar Series August 21, 2012 - 12:29pm Addthis The Department is preparing the 2012 Congestion Study now, and is hosting three webinars in August 2012 to receive input and suggestions concerning the preliminary findings of the study. The updated presentation used in the webinars is now available. Addthis Related Articles 2012 Congestion Study Webinars to Present Preliminary Findings and Receive Input from Stakeholders 2012 Congestion Study Workshops to be Held in December; Agendas Now Available Federal Register Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study

479

NREL: Transmission Grid Integration - Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

480

Electric Transmission Line Siting Compact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

Note: This page contains sample records for the topic "regional transmission planning" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications Proceedings of the March 25-26, 2009 Conference for the...

482

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

stability  analysis of transmission and distribution Voltage Recovery, NERC Transmission Issues  Subcommitte Air Conditioner Response to Transmission Faults. ” ,” IEEE 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

483

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

differences: models for transmission property rights,” IEEEto solve power transmission network design problems,” IEEES. A. "Network topologies and transmission investment under

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

484

Georgia Transmission Corp | Open Energy Information  

Open Energy Info (EERE)

Georgia Transmission Corp Place Georgia Utility Id 7197 Utility Location Yes Ownership T NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission Yes...

485

Definition: Transmission Customer | Open Energy Information  

Open Energy Info (EERE)

Load-Serving Entity, or Purchasing-Selling Entity.1 Related Terms transmission service, transmission lines, transmission line References Glossary of Terms Used in Reliability...

486

Definition: Transmission Owner | Open Energy Information  

Open Energy Info (EERE)

facilities.1 Related Terms Transmission Operatortransmission lines, transmission line, transmission lines References Glossary of Terms Used in Reliability Standards An in...

487

A PRECISION ANALOG FIBER OPTIC TRANSMISSION SYSTEM  

E-Print Network (OSTI)

Optical Fibers for Transmission, John Wiley and Sons, 9.Laboratories, Transmission Systems for Communications, BellANALOG FIBER OPTIC TRANSMISSION SYSTEM G. Stover M.S. Thesis

Stover, G.

2010-01-01T23:59:59.000Z

488

Automated manual transmission clutch controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (9375 Kearney Rd., Whitmore Lake, MI 48189); Reed, Jr., Richard G. (3003 Bembridge, Royal Oak, MI 48073); Rausen, David J. (519 S. Gaylord St., Denver, CO 80209)

1999-11-30T23:59:59.000Z

489

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network (OSTI)

, the Western Electricity Coordinating Council (WECC) develops a transmission expansion plan, a reliability SUBJECT: Briefing on Coordination of Regional Power and Transmission Planning The Council is a primary the regional transmission system. Similarly, regional transmission planning entities must accurately represent

490

Outside a Geothermal Region | Open Energy Information  

Open Energy Info (EERE)

Outside a Geothermal Region Outside a Geothermal Region Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Outside a Geothermal Region Details Areas (1) Power Plants (1) Projects (0) Techniques (0) This is a category for geothermal areas added that do not fall within an existing geothermal region. As a number of these accumulate on OpenEI, new regions can be created and areas moved into those regions accordingly. Geothermal Regions Map[1] References ↑ "Geothermal Regions Map" Geothermal Region Data State(s) Wyoming, Colorado Area USGS Resource Estimate for this Region Identified Mean Potential Undiscovered Mean Potential Planned Capacity Planned Capacity Plants Included in Planned Estimate Plants with Unknown Planned Capacity Geothermal Areas within the Outside a Geothermal Region

491

EIS-0128: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

128: Mitigation Action Plan 128: Mitigation Action Plan EIS-0128: Mitigation Action Plan Los Banos-Gates (Path 15) Transmission Project This MAP addresses the construction, operation, and maintenance of the new 84-mile long 500-kV transmission line. Necessary work conducted by Pacific Gas and Electric (PG&E) at their substations will occur within the previously disturbed area inside the substation boundaries. Western or Trans Elect, Inc. will also not have a role in upgrading the various existing PG&E 230-kV system components. DOE/EIS-0128, Western Area Power Administration, Mitigation Action Plan for the Los Banos-Gates (Path 15) Transmission Project (January 2003) More Documents & Publications EIS-0128: Mitigation Action Plan FAQS Gap Analysis Qualification Card - Mechanical Systems

492

Lift-and-project relaxations of AC microgrid distribution system planning  

Science Conference Proceedings (OSTI)

We apply relaxation procedures to polynomial optimization problems that originate in transmission system planning, and obtain new convex formulations for the AC case. The approach is novel because the optimization is efficient but also addresses the ... Keywords: AC power flow, lift-and-project relaxation, linear programming, transmission system planning

Joshua A. Taylor; Franz S. Hover

2011-06-01T23:59:59.000Z

493

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network (OSTI)

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

494

2009 National Electric Transmission Congestion Study - Chicago Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chicago Chicago Workshop 2009 National Electric Transmission Congestion Study - Chicago Workshop On September 17, 2008, DOE hosted a regional pre-study workshop in Chicago, IL to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 9-17-08 Congestion Workshop Agenda - Chicago, IL.pdf Transcript - 2009 National Electric Transmission Congestion Study Chicago Workshop.pdf Statement of Michael J. Kormos, PJM Interconnection, submitted at 2009 Congestion Study Chicago workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop

495

DOE Seeking Information on Transmission Line Permitting | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Seeking Information on Transmission Line Permitting Seeking Information on Transmission Line Permitting DOE Seeking Information on Transmission Line Permitting February 27, 2012 - 3:25pm Addthis The Department of Energy's Office of Electricity Delivery and Energy Reliability is seeking information on the questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local, and Tribal authorizations and are subject to a wide array of processes and procedural requirements in order to obtain all necessary permits and other authorizations. Delays in securing required statutory reviews, permits, and consultations can threaten the completion projects of national and regional significance. This Request for

496

2009 National Electric Transmission Congestion Study - Hartford Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 National Electric Transmission Congestion Study - Hartford 2009 National Electric Transmission Congestion Study - Hartford Workshop 2009 National Electric Transmission Congestion Study - Hartford Workshop On July 9, 2008, DOE hosted a regional pre-study workshop in Hartford, CT to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 7-09-08 Congestion Workshop Agenda - Hartford, CT.pdf Transcript - 2009 National Electric Transmission Congestion Study Hartford Workshop.pdf Comments of the New York Independent System Operator, submitted at 2009 Congestion Study Hartford workshop_0.pdf Prepared Remarks of Brian Forshaw, Connecticut Municipal Electric Energy Cooperative, submitted at 2009 Congestion Study Hartford workshop_0.pdf

497

Energy planning and management plan  

Science Conference Proceedings (OSTI)

This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

NONE

1996-01-01T23:59:59.000Z