  1. The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations

    SciTech Connect (OSTI)

    Kirby, Brendan J

    2006-07-01

    Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second

  2. Transmission and Storage Operations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission and Storage Operations Natural Gas Infrastructure R&D and Methane Mitigation Workshop Mary Savalle, PMP, LSSGB Compression Reliability Engineer November 12, 2014 ...

  3. Transmission and Storage Operations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission and Storage Operations Natural Gas Infrastructure R&D and Methane Mitigation Workshop Mary Savalle, PMP, LSSGB Compression Reliability Engineer November 12, 2014 Agenda * DTE Gas Snapshot * NOx & CO - Combustion stability * Methane - Packing - Blowdowns * Capture vs Flare 2 SNAPSHOT * DTE Gas - 41 Units * Age Range: 8-59yrs (Average 45yrs) - 118,200HP * 1,000-15,000HP - 7 different manufacturers * Cooper-Bessemer, Solar, Waukesha, DeLaval, IR, CAT, Ariel - Complete Mixture *

  4. Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations

    SciTech Connect (OSTI)

    Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

    2011-02-01

    The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

  5. Vice President, Transmission System Operations

    Broader source: Energy.gov [DOE]

    The VP for Transmission System Operations provides strategic leadership, direction, and oversight of the people, business processes, and systems that are responsible for the safe, reliable, and...

  6. Regional Transmission Projects: Finding Solutions

    SciTech Connect (OSTI)

    The Keystone Center

    2005-06-15

    The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association

  7. Midwest Independent Transmission System Operator | Open Energy...

    Open Energy Info (EERE)

    Midwest Independent Transmission System Operator Jump to: navigation, search Name: Midwest Independent Transmission System Operator Place: Carmel, IN References: SGIC1 This...

  8. State action in regional transmission groups

    SciTech Connect (OSTI)

    Rokach, J.Z.

    1994-12-01

    States should participate in coordinated transmission planning through regional transmission groups, while reserving their right to pass upon transmission planning. This would smooth an otherwise difficult transition, as FERC and state regulators seek to facilitate a competitive bulk power market that ignores arbitrary jurisdiction lines. Since the Federal Energy Regulatory Commission issued its Policy Statement on Regional Transmission Groups, two RTG`s, the Western Regional Transmission Association and the Southwest Regional Transmission Association, have gained conditional approval from FERC. A third, the Northwest Regional Transmission Association, files its governing agreement with the Commission, seeking FERC`s approval. Price setting within RTGs and information exchanges involved in planning the grid raise questions of the legality of these collective actions under the antitrust laws. All three agreements allow for exchanges of commercial and planning information, but, conspicuously, do not set transmission prices. For the moment, therefore, antitrust liability for RTGs would arise out of the information exchanges involved in planning the grid. In addition, with FERC pushing for `restructuring` at the wholesale level through open access and the states becoming aggressive in trying to institute competition at the consumer level through retail wheeling, issues of federal-state jurisdiction in transmission have come to the fore.

  9. The makings of a regional transmission group

    SciTech Connect (OSTI)

    Peterson, H.

    1994-04-15

    The Southwest Regional Transmission Association (SWRTA) plans to file this month at the Federal Energy Regulatory Commission (FERC) for recognition as a regional transmission group (RTG), pursuant to the FERC's July 1993 policy statement on RTGs. As the provision of electricity becomes less regulated and more competitive, many industry observers expect RTGs to play a key role in increasing the efficiency of our nation's electricity supply system. What exactly is an RTG There are as many definitions as there are interested parties. SWRTA's working group has spent over two years turning an idea into an RTG. Along the way they have learned a few important things about the FERC, congressional intent, the amended Federal Power Act, the dynamics of large groups, and fairness. This article describes the creation of the SWRTA RTG.

  10. EA-1982: Parker-Davis Transmission System Routine Operation and...

    Broader source: Energy.gov (indexed) [DOE]

    proposed continuation of operation and maintenance activities and implementation of a ... and at substations and maintenance facilities associated with the transmission system. ...

  11. Midwest Independent Transmission System Operator Smart Grid Project...

    Open Energy Info (EERE)

    to optimize the dispatch and operation of power plants while improving the reliability of the bulk transmission system. This project deploys phasor measurement units...

  12. Application for presidential permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System Inc.: Federal Register Notice Volume 70, No. 33- Feb. 18, 2005

    Broader source: Energy.gov [DOE]

    Application from Sea Breeze Pacific Regional Transmission System Inc to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. - Federal Register Notice

  13. PP-299 Sea Breeze Pacific Regional Transmission System Inc |...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications PP-299-1 Sea Breeze Olympic Converter LP Application for Presidential Permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System, INC ...

  14. Electric Transmission Network: A Multi-Region Analysis, The

    Reports and Publications (EIA)

    2000-01-01

    This paper examines the ability of the existing transmission network to respond efficiently to increased trade over four reliability regions in the northeastern United States.

  15. The role of regional transmission associations in providing open transmission access and services

    SciTech Connect (OSTI)

    Bahl, P.K.

    1996-05-01

    The Federal Energy Regulatory Commission (FERC) expanded its authority under the Energy Policy Act of 1992 and issued a Policy Statement on July 30, 1993, for the formation of Regional Transmission Groups (RTGs). In this Policy Statement, FERC laid out a minimum of seven components of RTG Governing Agreements. The purpose of the policy is for an RTG to become an effective instrument in enhancing competition in generation markets, and providing transmission access to requesting entities. The key components of the RTGs are: Coordinated Transmission Planning, Access Rules, Pricing Principles, Dispute Resolution, and adequate consultation and coordination with state regulatory commissions and other stakeholders. Though it is the responsibility of each regulated utility to obtain approval on transmission projects from its respective state commission and siting authority, the RTGs would create a mechanism to keep all commissions and other stakeholders informed on the development and finalization of new transmission projects. This would be done by providing copies of planning studies performed in the technical and economical evaluation of these projects.

  16. Central Wind Power Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities

    SciTech Connect (OSTI)

    Porter, K.; Rogers, J.

    2009-12-01

    The report addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America.

  17. Moving Beyond Paralysis: How States and Regions Are Creating Innovative Transmission Projects

    SciTech Connect (OSTI)

    Schumacher, A.; Fink, S.; Porter, K.

    2009-10-01

    This report profiles certain state and regional transmission policy initiatives aimed at promoting transmission development, mainly to access renewable resources including renewable energy zones, location-constrained tariffs, open seasons, and balanced portfolio plans. In particular, this article focuses on transmission initiatives intended to plan and build transmission in advance of new generation, instead of waiting for enough planned new generation to justify the development of a new transmission line of sufficient capability.

  18. EA-343 Midwest Independent Transmission Operator (MISO) | Department...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Co: Answer to NYISO from MISO and IESO EA-227-A New York ...

  19. Recovery Act-SmartGrid regional demonstration transmission and distribution (T&D) Infrastructure

    SciTech Connect (OSTI)

    Hedges, Edward T.

    2015-01-31

    This document represents the Final Technical Report for the Kansas City Power & Light Company (KCP&L) Green Impact Zone SmartGrid Demonstration Project (SGDP). The KCP&L project is partially funded by Department of Energy (DOE) Regional Smart Grid Demonstration Project cooperative agreement DE-OE0000221 in the Transmission and Distribution Infrastructure application area. This Final Technical Report summarizes the KCP&L SGDP as of April 30, 2015 and includes summaries of the project design, implementation, operations, and analysis performed as of that date.

  20. Central Wind Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities: Revised Edition

    SciTech Connect (OSTI)

    Rogers, J.; Porter, K.

    2011-03-01

    The report and accompanying table addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America. The first part of the table focuses on electric utilities and regional transmission organizations that have central wind power forecasting in place; the second part focuses on electric utilities and regional transmission organizations that plan to adopt central wind power forecasting in 2010. This is an update of the December 2009 report, NREL/SR-550-46763.

  1. Transmission Considerations for Market Operation: U.S. Design (Presentation)

    SciTech Connect (OSTI)

    Ela, E.

    2011-06-01

    Presented at the Utility Wind Integration Group (UWIG) Workshop on Market Design and Operation With Variable Renewables, 22 June 2011, Fredericia, Denmark. This presentation provides an overview of the present U.S. electricity market, how it operates, and some solutions for improving its operation, cost accounting, and integration of renewable power resources.

  2. Request for Information: Operation of Regional Test Center Test...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information: Operation of Regional Test Center Test Bed Located at SolarTAC Request for Information: Operation of Regional Test Center Test Bed Located at SolarTAC Solicitation...

  3. Evaluation of the heating operation and transmission district: Feasibility of cogeneration. Final report

    SciTech Connect (OSTI)

    Cable, J.H.; Gilday, L.T.; Moss, M.E.

    1995-11-01

    The General Services Administration, through its National Capital Region, operates a district heating system - called the Heating Operation and Transmission District - that provides steam to approximately 100 government buildings in Washington, D.C. HOTD is examining a host of options that will improve its ability to provide reliable, environmentally sound, and cost-effective service to its customers. This report evaluates one of those options - cogeneration, a technology that would enable HOTD to produce steam and electricity simultaneously. The study concluded that, under current regulations, cogeneration is not attractive economically because the payback period (15 years) exceeds Federal return-on-investment guidelines. However, if the regulatory environment changes to allow wheeling (transmission of power by a non-utility power producer to another user), cogeneration would be attractive; HOTD would save anywhere from $38 million to $118 million and the investment would pay back in 7 to 10 years. Although incorporating cogeneration into the HOTD system has no strong benefit at this time, the report recommends that GSA reevaluate cogeneration in one or two years because Federal regulations regarding wheeling are under review. It also recommends that GSA work with the District of Columbia government to develop standards for cogeneration.

  4. The design, construction, and operation of long-distance high-voltage electricity transmission technologies.

    SciTech Connect (OSTI)

    Molburg, J. C.; Kavicky, J. A.; Picel, K. C.

    2008-03-03

    This report focuses on transmission lines, which operate at voltages of 115 kV and higher. Currently, the highest voltage lines comprising the North American power grid are at 765 kV. The grid is the network of transmission lines that interconnect most large power plants on the North American continent. One transmission line at this high voltage was built near Chicago as part of the interconnection for three large nuclear power plants southwest of the city. Lines at this voltage also serve markets in New York and New England, also very high demand regions. The large power transfers along the West Coast are generally at 230 or 500 kV. Just as there are practical limits to centralization of power production, there are practical limits to increasing line voltage. As voltage increases, the height of the supporting towers, the size of the insulators, the distance between conductors on a tower, and even the width of the right-of-way (ROW) required increase. These design features safely isolate the electric power, which has an increasing tendency to arc to ground as the voltage (or electrical potential) increases. In addition, very high voltages (345 kV and above) are subject to corona losses. These losses are a result of ionization of the atmosphere, and can amount to several megawatts of wasted power. Furthermore, they are a local nuisance to radio transmission and can produce a noticeable hum. Centralized power production has advantages of economies of scale and special resource availability (for instance, hydro resources), but centralized power requires long-distance transfers of power both to reach customers and to provide interconnections for reliability. Long distances are most economically served at high voltages, which require large-scale equipment and impose a substantial footprint on the corridors through which power passes. The most visible components of the transmission system are the conductors that provide paths for the power and the towers that keep these

  5. Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues

    SciTech Connect (OSTI)

    Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

    2008-07-01

    California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

  6. Analysis of operations and cyber security policies for a system of cooperating Flexible Alternating Current Transmission System (FACTS) devices.

    SciTech Connect (OSTI)

    Phillips, Laurence R.; Tejani, Bankim; Margulies, Jonathan; Hills, Jason L.; Richardson, Bryan T.; Baca, Micheal J.; Weiland, Laura

    2005-12-01

    Flexible Alternating Current Transmission Systems (FACTS) devices are installed on electric power transmission lines to stabilize and regulate power flow. Power lines protected by FACTS devices can increase power flow and better respond to contingencies. The University of Missouri Rolla (UMR) is currently working on a multi-year project to examine the potential use of multiple FACTS devices distributed over a large power system region in a cooperative arrangement in which the FACTS devices work together to optimize and stabilize the regional power system. The report describes operational and security challenges that need to be addressed to employ FACTS devices in this way and recommends references, processes, technologies, and policies to address these challenges.

  7. PROJECT PROFILE: Regional Test Center Operations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regional Test Center Operations PROJECT PROFILE: Regional Test Center Operations Funding Opportunity: SuNLaMP SunShot Subprogram: Photovoltaics Location: Sandia National Laboratories, Albuquerque, NM SunShot Award Amount: $6,999,432 Location: National Renewable Energy Laboratory, Golden, CO SunShot Award Amount: $1,250,000 The Regional Test Center (RTC) program aims to support technical innovation in the U.S. solar sector by validating the performance of new PV products in multiple climates. The

  8. Impact of Utility-Scale Distributed Wind on Transmission-Level System Operations

    SciTech Connect (OSTI)

    Brancucci Martinez-Anido, C.; Hodge, B. M.

    2014-09-01

    This report presents a new renewable integration study that aims to assess the potential for adding distributed wind to the current power system with minimal or no upgrades to the distribution or transmission electricity systems. It investigates the impacts of integrating large amounts of utility-scale distributed wind power on bulk system operations by performing a case study on the power system of the Independent System Operator-New England (ISO-NE).

  9. Experimental and simulational study of the operation conditions for a high transmission mass filter

    SciTech Connect (OSTI)

    Ayesh, A. I.; Lassesson, A.; Brown, S. A.; Dunbar, A. D. F.; Kaufmann, M.; Partridge, J. G.; Reichel, R.; Lith, J. van

    2007-05-15

    The operation conditions of a double pulsed field mass filter were studied using both experiment and simulation. The mass filter consists of two pairs of parallel plates and operates on the time-of-flight principle. The study showed that the ions' beam deflection angle is a critical factor in optimizing the mass filter transmission efficiency. This angle is dependent on the accelerating voltage, ion mass, and horizontal velocity of the ions. The optimum operating conditions for the mass filter were found and used to study the mass distribution of palladium ions produced by a magnetron sputtering source. The study shows that this mass filter is suitable for technological applications because of its high transmission and wide mass range.

  10. LHC INTERACTION REGION CORRECTION IN HEAVY ION OPERATION

    SciTech Connect (OSTI)

    PTITSIN,V.; FISCHER,W.; WEI,J.

    1999-09-07

    In heavy ion operation the LHC interaction region at IP2 will have a low-{beta} optics for collisions. The dynamic aperture is therefore sensitive to magnetic field errors in the interaction region quadrupoles and dipoles. The authors investigate the effect of the magnetic field errors on the dynamic aperture and evaluate the effectiveness of local interaction region correctors. The dynamic aperture and the tune space are computed for different crossing angles.

  11. Understanding Cognitive and Collaborative Work: Observations in an Electric Transmission Operations Control Center

    SciTech Connect (OSTI)

    Obradovich, Jodi H.

    2011-09-30

    This paper describes research that is part of an ongoing project to design tools to assist in the integration of renewable energy into the electric grid. These tools will support control room dispatchers in real-time system operations of the electric power transmission system which serves much of the Western United States. Field observations comprise the first phase of this research in which 15 operators have been observed over various shifts and times of day for approximately 90 hours. Findings describing some of the cognitive and environmental challenges of managing the dynamically changing electric grid are presented.

  12. Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bulk Electric Power Systems: Operations and Transmission Planning Volume 4 of 4 Volume 2 PDF Volume 3 PDF Volume 1 PDF Volume 4 PDF NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Renewable Electricity Futures Study Edited By Hand, M.M. National Renewable Energy Laboratory Baldwin, S. U.S. Department of Energy DeMeo, E. Renewable Energy Consulting Services, Inc. Reilly, J.M.

  13. Renewable Electricity Futures Study Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning

    Broader source: Energy.gov [DOE]

    This volume focuses on the role of variable renewable generation in creating challenges to the planning and operations of power systems and the expansion of transmission to deliver electricity from remote resources to load centers. The technical and institutional changes to power systems that respond to these challenges are, in many cases, underway, driven by the economic benefits of adopting more modern communication, information, and computation technologies that offer significant operational cost savings and improved asset utilization. While this volume provides background information and numerous references, the reader is referred to the literature for more complete tutorials.

  14. Transmission line relay mis-operation detection based on time-synchronized field data

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Esmaeilian, Ahad; Popovic, Tomo; Kezunovic, Mladen

    2015-05-04

    In this paper, a real-time tool to detect transmission line relay mis-operation is implemented. The tool uses time-synchronized measurements obtained from both ends of the line during disturbances. The proposed fault analysis tool comes into the picture only after the protective device has operated and tripped the line. The proposed methodology is able not only to detect, classify, and locate transmission line faults, but also to accurately confirm whether the line was tripped due to a mis-operation of protective relays. The analysis report includes either detailed description of the fault type and location or detection of relay mis-operation. As such,more » it can be a source of very useful information to support the system restoration. The focus of the paper is on the implementation requirements that allow practical application of the methodology, which is illustrated using the field data obtained the real power system. Testing and validation is done using the field data recorded by digital fault recorders and protective relays. The test data included several hundreds of event records corresponding to both relay mis-operations and actual faults. The discussion of results addresses various challenges encountered during the implementation and validation of the presented methodology.« less

  15. Transmission line relay mis-operation detection based on time-synchronized field data

    SciTech Connect (OSTI)

    Esmaeilian, Ahad; Popovic, Tomo; Kezunovic, Mladen

    2015-05-04

    In this paper, a real-time tool to detect transmission line relay mis-operation is implemented. The tool uses time-synchronized measurements obtained from both ends of the line during disturbances. The proposed fault analysis tool comes into the picture only after the protective device has operated and tripped the line. The proposed methodology is able not only to detect, classify, and locate transmission line faults, but also to accurately confirm whether the line was tripped due to a mis-operation of protective relays. The analysis report includes either detailed description of the fault type and location or detection of relay mis-operation. As such, it can be a source of very useful information to support the system restoration. The focus of the paper is on the implementation requirements that allow practical application of the methodology, which is illustrated using the field data obtained the real power system. Testing and validation is done using the field data recorded by digital fault recorders and protective relays. The test data included several hundreds of event records corresponding to both relay mis-operations and actual faults. The discussion of results addresses various challenges encountered during the implementation and validation of the presented methodology.

  16. EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Western Area Power Administration prepared an EA that assesses potential environmental impacts of the proposed continuation of operation and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System in Arizona, California, and Nevada. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

  17. Flexible gas insulated transmission line having regions of reduced electric field

    DOE Patents [OSTI]

    Cookson, Alan H.; Fischer, William H.; Yoon, Kue H.; Meyer, Jeffry R.

    1983-01-01

    A gas insulated transmission line having radially flexible field control means for reducing the electric field along the periphery of the inner conductor at predetermined locations wherein the support insulators are located. The radially flexible field control means of the invention includes several structural variations of the inner conductor, wherein careful controlling of the length to depth of surface depressions produces regions of reduced electric field. Several embodiments of the invention dispose a flexible connector at the predetermined location along the inner conductor where the surface depressions that control the reduced electric field are located.

  18. A long-pulse repetitive operation magnetically insulated transmission line oscillator

    SciTech Connect (OSTI)

    Fan, Yu-Wei; Zhong, Hui-Huang; Zhang, Jian-De; Shu, Ting; Liu, Jin Liang

    2014-05-15

    The improved magnetically insulated transmission line oscillator (MILO) is a gigawatt-class L-band high power microwave tube. It has allowed us to generate 3.1 GW pulse of 40 ns duration in the single-pulse operation and 500 MW pulse of 25 ns duration in the repetition rate operation. However, because of the severe impedance mismatch, the power conversion efficiency is only about 4% in the repetition rate operation. In order to eliminate the impedance mismatch and obtain repetitive long-pulse high-power microwave (HPM), a series of experiments are carried out and the recent progress is presented in this paper. In the single-pulse operation, when the diode voltage is 466 kV and current is 41.6 kA, the radiated microwave power is above 2.2 GW, the pulse duration is above 102 ns, the microwave frequency is about 1.74 GHz, and the power conversion efficiency is about 11.5%. In the repetition rate operation, under the condition of the diode voltage about 400 kV, beam current about 38 kA, the radiated microwave power is about 1.0 GW, the pulse duration is about 85 ns. Moreover, the radiated microwave power and the pulse duration decline little by little when the shot numbers increase gradually. The experimental results show that the impedance matching is a vital factor for HPM systems and one of the major technical challenges is to improve the cathode for the repetition rate operation MILO.

  19. Transmission Planning Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2015-06-23

    Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identifymore » weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysis and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.« less

  20. Transmission Planning Analysis Tool

    SciTech Connect (OSTI)

    2015-06-23

    Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identify weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysis and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.

  1. Decision-Support Software for Grid Operators: Transmission Topology Control for Infrastructure Resilience to the Integration of Renewable Generation

    SciTech Connect (OSTI)

    2012-03-16

    GENI Project: The CRA team is developing control technology to help grid operators more actively manage power flows and integrate renewables by optimally turning on and off entire power lines in coordination with traditional control of generation and load resources. The control technology being developed would provide grid operators with tools to help manage transmission congestion by identifying the facilities whose on/off status must change to lower generation costs, increase utilization of renewable resources and improve system reliability. The technology is based on fast optimization algorithms for the near to real-time change in the on/off status of transmission facilities and their software implementation.

  2. U.S. Department of Energy Schedules Regional Workshops to Provide Expert Input on 2009 Transmission Congestion Study

    Broader source: Energy.gov [DOE]

    As part of the Bush Administration's comprehensive effort to provide wide-ranging data and thorough statistical analysis in its 2009 National Transmission Congestion Study (Congestion Study), U.S. Department of Energy (DOE) Assistant Secretary for Electricity Delivery and Energy Reliability (OE) Kevin Kolevar today announced that the Department will hold six regional technical workshops across the country, to seek input on available transmission congestion data to be considered during preparation of the Congestion Study.

  3. Elimination of higher-order diffraction using zigzag transmission grating in soft x-ray region

    SciTech Connect (OSTI)

    Zang, H. P.; Wang, C. K.; Gao, Y. L.; Zhou, W. M.; Kuang, L. Y.; Wei, L.; Fan, W.; Zhang, W. H.; Zhao, Z. Q.; Cao, L. F.; Gu, Y. Q.; Zhang, B. H.; Jiang, G.; Zhu, X. L.; Xie, C. Q.; Zhao, Y. D.; Cui, M. Q.

    2012-03-12

    We present a realization of the sinusoidal transmission function using a series of zigzag-profiled strips where the transmission takes on the binary values 0 and 1 in a two-dimensional distribution. A zigzag transmission grating of 1000 line/mm has been fabricated and demonstrated on the soft x-ray beam of synchrotron radiation. The axial single-order diffraction indicates that the zigzag transmission grating is adequate for spectroscopic application.

  4. ,"Midwest Region Underground Natural Gas Storage - All Operators...

    U.S. Energy Information Administration (EIA) Indexed Site

    ...282016 11:29:21 AM" "Back to Contents","Data 1: Total Underground Storage" ... Region Natural Gas in Underground Storage (Base Gas) (MMcf)","Midwest Region Natural Gas ...

  5. ,"Mountain Region Underground Natural Gas Storage - All Operators...

    U.S. Energy Information Administration (EIA) Indexed Site

    ...282016 11:29:22 AM" "Back to Contents","Data 1: Total Underground Storage" ... Region Natural Gas in Underground Storage (Base Gas) (MMcf)","Mountain Region Natural Gas ...

  6. ,"Pacific Region Underground Natural Gas Storage - All Operators...

    U.S. Energy Information Administration (EIA) Indexed Site

    ...282016 11:29:26 AM" "Back to Contents","Data 1: Total Underground Storage" ... Region Natural Gas in Underground Storage (Base Gas) (MMcf)","Pacific Region Natural Gas ...

  7. ,"East Region Underground Natural Gas Storage - All Operators...

    U.S. Energy Information Administration (EIA) Indexed Site

    ...282016 11:29:19 AM" "Back to Contents","Data 1: Total Underground Storage" ... Region Natural Gas in Underground Storage (Base Gas) (MMcf)","East Region Natural Gas in ...

  8. Northwest Hydro Operators Regional Forum (pbl/generation)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    S4.4 Operational Excellence Program Update - Jim Miller S5.1 New Power - Challenges and Lessons Learned from PSE's Lower Baker Unit 4 Powerhouse - Paul Jusak S5.2 Snoqualmie...

  9. Transmission Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Grid Tech Team U.S. Department of Energy DOE Grid Tech Team (GTT) The Grid Tech Team ... regional diversity, AC-DC transmission and distribution solutions, ...

  10. Request for Information: Operation of Regional Test Center Test Bed Located at SolarTAC

    Office of Energy Efficiency and Renewable Energy (EERE)

    Solicitation Title:  Request for Information: Operation of Regional Test Center Test Bed Located at SolarTAC

  11. VP of Transmission System Asset Management for Desert Southwest Region (Maintenance Manager)

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Maintenance (G5000) 615 S. 43rd Avenue Phoenix, AZ 85009...

  12. NREL: Transmission Grid Integration - Transmission Planning and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Printable Version Transmission Grid Integration Home Issues Projects Western Wind & Solar ... Electricity Market Operations Energy Imbalance Markets FESTIV Model Active ...

  13. Transmission decisions

    SciTech Connect (OSTI)

    Ellison, C.T. )

    1993-03-01

    As the US FERC moves forward to implement the transmission access provisions of the National Energy Policy Act of 1992, the debate over Regional Transmission Groups continues. Independent energy producers have much at stake in this debate and their reaction to the general RTG concept and to specific RTG proposals will weigh heavily in determining the fate of these proposals.

  14. Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning

    SciTech Connect (OSTI)

    Milligan, M.; Ela, E.; Hein, J.; Schneider, T.; Brinkman, G.; Denholm, P.

    2012-06-01

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%-90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT).

  15. Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems. Operations and Transmission Planning

    SciTech Connect (OSTI)

    Milligan, Michael; Ela, Erik; Hein, Jeff; Schneider, Thomas; Brinkman, Gregory; Denholm, Paul

    2012-06-15

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%–90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT). Learn more at the RE Futures website. http://www.nrel.gov/analysis/re_futures/

  16. Final Report Navajo Transmission Project (NTP)

    SciTech Connect (OSTI)

    Bennie Hoisington; Steven Begay

    2006-09-14

    The Din Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

  17. Evaluating the potential impact of transmission constraints on the operation of a competitive electricity market in Illinois.

    SciTech Connect (OSTI)

    Cirillo, R.; Thimmapuram, P.; Veselka, T.; Koritarov, V.; Conzelmann, G.; Macal, C.; Boyd, G.; North, M.; Overbye, T.; Cheng, X.; Decision and Information Sciences; Univ. of Illinois

    2006-04-30

    Despite the current adequacy of the generation and transmission system in Illinois, there is concern that the uncertainties of electricity restructuring warrant a more detailed analysis to determine if there might be pitfalls that have not been identified under current conditions. The problems experienced elsewhere in the country emphasize the need for an evaluation of how Illinois might fare under a restructured electricity market. The Illinois Commerce Commission (ICC) commissioned this study to be undertaken as a joint effort by the University of Illinois at Urbana-Champaign and Argonne National Laboratory to evaluate the Illinois situation in the 2007 period when restructuring is scheduled to be fully implemented in the State. The purpose of this study is to make an initial determination if the transmission system in Illinois and the surrounding region would be able to support a competitive electricity market, would allow for effective competition to keep prices in check, and would allow for new market participants to effectively compete for market share. The study seeks to identify conditions that could reasonably be expected to occur that would enable a company to exercise market power in one or more portions of the State and thereby create undue pressure on the prices charged to customers and/or inhibit new market participants from entering the market. The term 'market power' has many different definitions, and there is no universal agreement on how to measure it. For the purposes of this study, the term is defined as the ability to raise prices and increase profitability by unilateral action. A more complete definition is provided later. With this definition, the central question of this analysis becomes: 'Can a company, acting on its own, raise electricity prices and increase its profits?' It should be noted that the intent of the study is not to predict whether or not such market power would be exercised by any company. Rather, it is designed to determine

  18. PP-230 International Transmission Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    International Transmission Company PP-230 International Transmission Company Presidential permit authorizing International Transmission Company to construct, operate, and maintain ...

  19. Transmission Planning

    Broader source: Energy.gov [DOE]

    The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security.

  20. EIS-0411: Transmission Agency of Northern California Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

  1. Regional four-dimensional variational data assimilation in a quasi-operational forecasting environment

    SciTech Connect (OSTI)

    Zupanski, M. )

    1993-08-01

    Four-dimensional variational data assimilation is applied to a regional forecast model as part of the development of a new data assimilation system at the National Meteorological Center (NMC). The assimilation employs an operational version of the NMC's new regional forecast model defined in eta vertical coordinates, and data used are operationally produced optimal interpolation (OI) analyses (using the first guess from the NMC's global spectral model), available every 3 h. Humidity and parameterized processes are not included in the adjoint model integration. The calculation of gradients by the adjoint model is approximate since the forecast model is used in its full-physics operational form. All experiments are over a 12-h assimilation period with subsequent 48-h forecast. Three different types of assimilation experiments are performed: (a) adjustment of initial conditions only (standard [open quotes]adjoint[close quotes] approach), (b) adjustment of a correction to the model equations only (variational continuous assimilation), and (c) simultaneous or sequential adjustment of both initial conditions and the correction term. Results indicate significantly better results when the correction term is included in the assimilation. It is shown, for a single case, that the new technique [experiment (c)] is able to produce a forecast better than the current conventional OI assimilation. It is very important to note that these results are obtained with an approximate gradient, calculated from a simplified adjoint model. Thus, it may be possible to perform an operational four-dimensional variational data assimilation of realistic forecast models, even before more complex adjoint models are developed. Also, the results suggest that it may be possible to reduce the large computational cost of assimilation by using only a few iterations of the minimization algorithm. This fast convergence is encouraging from the prospective of operational use. 37 refs., 10 figs., 1 tab.

  2. Electrical Engineer- Transmission Lines

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration, Upper Great Plains Region, Maintenance, North Dakota Maintenance, Transmission...

  3. The case for reasonable incentives to promote independent transmission companies

    SciTech Connect (OSTI)

    Angle, S.; Carpentier, D.A.; Farinella, M.

    1999-09-01

    As part of its restructuring efforts in the electric utility industry, the Federal Energy Regulatory Commission (FERC) has encouraged voluntary corporate unbundling in an effort to promote a competitive electric market, recently proposing to define the minimal and desired characteristics of a regional transmission organization (RTO). The promotion of competition requires certain features in a transmission system, which include inter alia, (1) independent operation; (2) efficient pricing of congestion; (3) congestion management; (4) provision of ancillary services; (5) elimination of pancaked transmission rates; (6) appropriate transmission pricing; and (7) price transparency. A promising type of corporate unbundling that can provide these features is an independent transmission company (ITC).

  4. Areal-averaged and Spectrally-resolved Surface Albedo from Ground-based Transmission Data Alone: Toward an Operational Retrieval

    SciTech Connect (OSTI)

    Kassianov, Evgueni I.; Barnard, James C.; Flynn, Connor J.; Riihimaki, Laura D.; Michalsky, Joseph; Hodges, G. B.

    2014-08-22

    We present here a simple retrieval of the areal-averaged and spectrally resolved surface albedo using only ground-based measurements of atmospheric transmission under fully overcast conditions. Our retrieval is based on a one-line equation and widely accepted assumptions regarding the weak spectral dependence of cloud optical properties in the visible and near-infrared spectral range. The feasibility of our approach for the routine determinations of albedo is demonstrated for different landscapes with various degrees of heterogeneity using three sets of measurements:(1) spectrally resolved atmospheric transmission from Multi-Filter Rotating Shadowband Radiometer (MFRSR) at wavelength 415, 500, 615, 673, and 870 nm, (2) tower-based measurements of local surface albedo at the same wavelengths, and (3) areal-averaged surface albedo at four wavelengths (470, 560, 670 and 860 nm) from collocated and coincident Moderate Resolution Imaging Spectroradiometer (MODIS) observations. These integrated datasets cover both long (2008-2013) and short (April-May, 2010) periods at the ARM Southern Great Plains (SGP) site and the NOAA Table Mountain site, respectively. The calculated root mean square error (RMSE), which is defined here as the root mean squared difference between the MODIS-derived surface albedo and the retrieved area-averaged albedo, is quite small (RMSE≤0.01) and comparable with that obtained previously by other investigators for the shortwave broadband albedo. Good agreement between the tower-based daily averages of surface albedo for the completely overcast and non-overcast conditions is also demonstrated. This agreement suggests that our retrieval originally developed for the overcast conditions likely will work for non-overcast conditions as well.

  5. Environmental and economic assessment of discharges from Gulf of Mexico Region Oil and Gas Operations

    SciTech Connect (OSTI)

    Gettleson, D.A.

    1997-11-24

    Task 3 (Environmental Field Sampling and Analysis of NORM, Heavy Metals, and Organics) and 4 (Monitoring of the Recovery of Impacted Wetland and Open Bay Produced Water Discharge Sites in Coastal Louisiana and Texas) activities involved continued data analysis and report writing. Task 5 (Assessment of Economic Impacts of Offshore and Coastal Discharge Requirements on Present and Future Operations in the Gulf of Mexico Region) was issued as a final report during the previous reporting period. Task 6 (Synthesis of Gulf of Mexico Seafood Consumption and Use Patterns) activities included the preparation of the final report. There were no Task 7 (Technology Transfer Plan) activities to report. Task 8 (Project Management and Deliverables) activities involved the submission of the necessary reports and routine management.

  6. Automated manual transmission controller

    DOE Patents [OSTI]

    Lawrie, Robert E.; Reed, Jr., Richard G.; Bernier, David R.

    1999-12-28

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  7. Wind Turbine Wake Measurements in the Operating Region of a Tail Vain

    SciTech Connect (OSTI)

    Larwood, S.

    2001-01-22

    In conjunction with the National Renewable Energy Laboratory's (NREL's) Unsteady Aerodynamics Experiment (UAE) at NASA Ames, we measured the wake of an upwind 10-meter (m) diameter wind turbine in the typical region of a tail vane. The experiment was performed in a 24.4-by-36.6-m wind tunnel. We placed two sonic anemometers 0.58 rotor diameters downwind of the rotor at hub height. One was positioned nominally behind the nacelle at 9% radius and the second was placed 2-m outboard at 49% radius. The tunnel wind speed was varied from 5 to 25 meters per second (m/s) and the turbine rotor speed was held at 72 revolutions per minute (rpm). We varied yaw from 0{degree} to 60{degree}. The data showed unsteadiness in the wake due to the nacelle wake. Also, the unsteadiness increased with the onset of blade stall. The axial induction factor in the wake showed that the turbine was operating within the windmill brake state of actuator disk momentum theory. Little variation in unsteadiness was shown under yawed conditions. We also discovered that lateral velocity behind the nacelle was negative and would result in an unfurling normal force on a tail vane. The vertical velocity was shown to change sign under yawed conditions, conceivably as a result of the opposing blade root vortex.

  8. PP-76 The Vermont Electric Transmission Company | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Vermont Electric Transmission Company to construct, operate, and maintain transmission facilities at the U.S. - Canada Border. PDF icon PP-76 The Vermont Electric Transmission ...

  9. PP-230-2 International Transmission Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 International Transmission Company PP-230-2 International Transmission Company Presidential permit authorizing International Transmission Company to construct, operate, and ...

  10. PP-230-4 International Transmission Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 International Transmission Company PP-230-4 International Transmission Company Presidential Permit authorizing International Transmission Company to construct, operate and ...

  11. Development of a Remotely Operated NDE System for Inspection of Hanford's Double Shell Waste Tank Knuckle Regions

    SciTech Connect (OSTI)

    Pardini, Allan F.; Alzheimer, James M.; Crawford, Susan L.; Diaz, Aaron A.; Gervais, Kevin L.; Harris, Robert V.; Riechers, Douglas M.; Samuel, Todd J.; Schuster, George J.; Tucker, Joseph C.; Roberts, R. A.

    2001-09-28

    This report documents work performed at the PNNL in FY01 to support development of a Remotely Operated NDE (RONDE) system capable of inspecting the knuckle region of Hanford's DSTs. The development effort utilized commercial off-the-shelf (COTS) technology wherever possible and provided a transport and scanning device for implementing the SAFT and T-SAFT techniques.

  12. Operations Support Specialist

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services Transmission Business Unit, (J7300)...

  13. Chapter 4 Transmission Adequacy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development

  14. NREL: Transmission Grid Integration - Hawaii Solar Integration...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wholesale Electricity Market Operations Energy Imbalance Markets FESTIV Model Active Power Controls Generator Modeling Forecasting Grid Simulation Transmission Planning & Analysis

  15. Transmission Workshop

    Broader source: Energy.gov [DOE]

    On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC.

  16. Methods, systems and apparatus for controlling third harmonic voltage when operating a multi-space machine in an overmodulation region

    SciTech Connect (OSTI)

    Perisic, Milun; Kinoshita, Michael H; Ranson, Ray M; Gallegos-Lopez, Gabriel

    2014-06-03

    Methods, system and apparatus are provided for controlling third harmonic voltages when operating a multi-phase machine in an overmodulation region. The multi-phase machine can be, for example, a five-phase machine in a vector controlled motor drive system that includes a five-phase PWM controlled inverter module that drives the five-phase machine. Techniques for overmodulating a reference voltage vector are provided. For example, when the reference voltage vector is determined to be within the overmodulation region, an angle of the reference voltage vector can be modified to generate a reference voltage overmodulation control angle, and a magnitude of the reference voltage vector can be modified, based on the reference voltage overmodulation control angle, to generate a modified magnitude of the reference voltage vector. By modifying the reference voltage vector, voltage command signals that control a five-phase inverter module can be optimized to increase output voltages generated by the five-phase inverter module.

  17. Automated manual transmission clutch controller

    DOE Patents [OSTI]

    Lawrie, Robert E.; Reed, Jr., Richard G.; Rausen, David J.

    1999-11-30

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  18. Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick

    SciTech Connect (OSTI)

    1993-10-01

    This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

  19. Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Larry Rappaport

    Broader source: Energy.gov [DOE]

    Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

  20. Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Karen Skurka

    Broader source: Energy.gov [DOE]

    Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

  1. Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Updated Opinion of Counsel

    Broader source: Energy.gov [DOE]

    Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

  2. Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Fran Buteau

    Broader source: Energy.gov [DOE]

    Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

  3. Tri State Generation and Transmission Association Inc | Open...

    Open Energy Info (EERE)

    and Transmission Association Inc Place: Westminster, Colorado Zip: 80234 Product: A wholesale electric power asset operator and transmission grid. Coordinates: 43.07212,...

  4. PP-230-1 International Transmission Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 International Transmission Company PP-230-1 International Transmission Company Presidential permit authorizing British Columbia Electric Company, Limited to construct, operate, ...

  5. EIS-0463: Northern Pass Transmission Line Project, New Hampshire...

    Broader source: Energy.gov (indexed) [DOE]

    permit to Northern Pass Transmission, LLC, to construct, operate, maintain, and connect a new electric transmission line across the U.S.-Canada border in northern New Hampshire. ...

  6. PP-22-4 British Columbia Transmission Corporation

    Broader source: Energy.gov [DOE]

    Presidential permit authorizing British Columbia Transmission Corporation to construct, operate, and mantain electric transmission facilities at the U.S-Canadian border.

  7. Transmission Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Services BPA Clarifications on the DSO216 1 Document updated on 2242015 at 3:29:25 PM B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Clarifications on...

  8. EIS-0231: Navajo Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned...

  9. Great Plains Wind Energy Transmission Development Project

    SciTech Connect (OSTI)

    Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

    2012-06-09

    In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the

  10. Transmission Line Security Monitor: Final Report

    SciTech Connect (OSTI)

    John Svoboda

    2011-04-01

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  11. An Annotated Bibliography of High-Voltage Direct-Current Transmission and Flexible AC Transmission (FACTS) Devices, 1991-1993.

    SciTech Connect (OSTI)

    Litzenberger, Wayne; Lava, Val

    1994-08-01

    References are contained for HVDC systems, converter stations and components, overhead transmission lines, cable transmission, system design and operations, simulation of high voltage direct current systems, high-voltage direct current installations, and flexible AC transmission system (FACTS).

  12. Supervisory Transmission Lines and Substation Maintenance Manager

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Transmission Lines and Substation Maintenance (G5200) 615...

  13. Transmission | Department of Energy

    Energy Savers [EERE]

    resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on...

  14. Transmission Business Line

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Business Line Non-Federal Financing of Transmission Projects - March 2004 Critical paths on the Northwest transmission grid are congested and the system is near or at...

  15. Storage & Transmission Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Storage & Transmission Projects Storage & Transmission Projects Storage & Transmission Projects Storage & Transmission Projects Storage & Transmission Projects Storage & ...

  16. Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from National Park Service- Wendy Jannsen

    Broader source: Energy.gov [DOE]

    Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

  17. Infrastructure Needs: Natural Gas/Electricity Transmission,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Through our six operating companies, Eversource operates over 4,300 miles of transmission lines, 72,000 miles of distribution lines, and 6,500 miles of natural gas pipelines. ...

  18. DOE Transmission Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Order No. 1000 Transmission Ratemaking Enabling New Resources - Demand Response - Variable Generation - Storage 2 Stages of Transmission Planning - Local, ...

  19. Steps to Establish a Real-Time Transmission Monitoring System for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Owners and Operators within the Eastern and Western Interconnections | Department of Energy Steps to Establish a Real-Time Transmission Monitoring System for Transmission Owners and Operators within the Eastern and Western Interconnections Steps to Establish a Real-Time Transmission Monitoring System for Transmission Owners and Operators within the Eastern and Western Interconnections Steps to establish a real-time transmission monitoring system for transmission owners and

  20. Hydromechanical transmission

    DOE Patents [OSTI]

    Orshansky, Jr. deceased, Elias; Weseloh, William E.

    1978-01-01

    A power transmission having three planetary assemblies, each having its own carrier and its own planet, sun, and ring gears. A speed-varying module is connected in driving relation to the input shaft and in driving relationship to the three sun gears, all of which are connected together. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being connected in driving relation to the input shaft, the other unit, which may have a fixed stroke, being connected in driving relation to the sun gears. The input shaft also drives the carrier of the third planetary assembly. A brake grounds the first carrier in the first range and in reverse and causes drive to be delivered to the output through the first ring gear in a hydrostatic mode. The carrier of the third planetary assembly drives the ring gear of the second planetary assembly, and a first clutching means connects the second carrier with the output in a second range, the brake for grounding the first carrier then being released. A second clutching means enables the third ring gear to drive the output shaft in a third range.

  1. EA-1972: Electric District 2 to Saguaro No. 2 Transmission Line Rebuild; Pinal County, Arizona

    Broader source: Energy.gov [DOE]

    Western Area Power Administration prepared an EA that assesses the potential environmental impacts of the proposed rebuild of a 35.6-mile transmission line that Western operates and maintains under an agreement with the Central Arizona Project. Additional information is available on the project website, https://www.wapa.gov/regions/DSW/Environment/Pages/ed2-saguaro-nepa.aspx.

  2. Automated manual transmission mode selection controller

    DOE Patents [OSTI]

    Lawrie, Robert E.

    1999-11-09

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  3. Automated manual transmission shift sequence controller

    DOE Patents [OSTI]

    Lawrie, Robert E.; Reed, Richard G.; Rausen, David J.

    2000-02-01

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both, an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  4. Regional operations research program for commercialization of geothermal energy in the Rocky Mountain Basin and Range. Final report, August 1, 1978-February 28, 1980

    SciTech Connect (OSTI)

    Marlin, J.M.; Cunniff, R.; McDevitt, P.; Nowotny, K.; O'Dea, P.

    1981-01-01

    The work accomplished from August 1978 to February 1980 in the Regional Operations Research efforts for the Rocky Mountain Basin and Range Geothermal Commercialization Program are described. The work included continued data acquisition and extension of the data base, enhancement and refinement of the economic models for electric and direct use applications, site-specific and aggregated analyses in support of the state teams and special analyses in support of several federal agencies.

  5. Superfund record of decision (EPA Region 2): Forest Glen subdivision, Operable Unit 2, Niagara Falls, NY, March 31, 1998

    SciTech Connect (OSTI)

    1998-09-01

    This operable unit represents the second of three operable units planned for the site. It addresses the principal threats posed by the site through controlling the source of contamination. The major components of the selected remedy include: excavation of contaminated soils from the southern portion of the site, and contaminated sediment from East Gill Creek, and consolidation of these materials in the northern portion of the site followed by grading in preparation for placement of the cap; construction of an 8.5-acre cap over the consolidated soils in the northern portion of the site in conformance with the major elements described in 6 New York Code of Rules and Regulations Part 360 for solid waste landfill caps; removal and off-site disposal of the vacant trailers and two permanent homes to facilitate the excavation of soils; and capping the Wooded Wetland with six inches of clean sediment.

  6. Superfund record of decision (EPA Region 3): Publicker Industries, Inc., operable unit 3, Philadelphia, PA, December 28, 1995

    SciTech Connect (OSTI)

    1997-04-01

    This decision document presents the selected remedial action for Operable Unit No. 3 of the Publicker Industries Site (the Site) in Philadelphia, Pennsyvlania. The major components of the selected remedy include: Abandonment of on-Site ground water wells; Removal, treatment, and off-Site disposal of liquids and sediments in contaminated electric utilities; Removal, treatment and off-Site disposal of liquids and sediments in contaminated stormwater trenches and utilities; and Removal treatment and off-Site disposal of miscellaneous wastes.

  7. Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company

    Office of Energy Efficiency and Renewable Energy (EERE)

    Response of PJM Interconnection, L.L.C. to Answer of International Transmission Company on the application from International Transmission Company to construct, operate, and maintain electric...

  8. RAPID/BulkTransmission/Transmission Siting & Interconnection...

    Open Energy Info (EERE)

    federal review). Bulk Transmission Transmission Siting & Interconnection in New Mexico New Mexico Statutes (N.M.S.) 62-9-1, 62-9-3(B), and 62-9-3.2 No Location Permit may be...

  9. Superfund record of decision (EPA Region 8): Ellsworth Air Force Base, Operable Unit 1, Rapid City, SD, May 10, 1996

    SciTech Connect (OSTI)

    1996-10-01

    This ROD is for remedial action at OU-1. The selected alternative, source area soil and ground-water treatment, includes: Continued operation of the interim remedial action (IRA) which consisted of contaminated ground-water removal, soil vapor extraction (SVE), and treatment; Installation of additional SVE wells within the historical burn-pit area to be added to the existing IRA SVE system; Removal of contaminated ground water using additional ground-water wells and collection trenches to be added to the IRA ground-water recovery system; Treatment of ground water at the existing IRA treatment plant; and Institutional controls for the area.

  10. Superfund Record of Decision (EPA Region 8): Rocky Mountain Arsenal (Operable Unit 21), CO. (Ninth remedial action), June 1991

    SciTech Connect (OSTI)

    Not Available

    1991-06-06

    The Rocky Mountain Arsenal (RMA) (Operable Unit 21) site comprises part of the 17,000-acre RMA site, which is a former U.S. Army chemical warfare and incendiary munitions manufacturing and assembly plant in Adams County, Colorado. From the 1950s until late 1969, the U.S. Army used the RMA facility to produce the nerve agent GB (isopropylmethyl-phosphonofluoridate). In addition, between 1947 and 1982, private industries leased major portions of the plant's facilities to manufacture various insecticides and herbicides. Operable Unit 21 (OU21), the South Tank Farm Plume (STFP), is one of several areas being addressed as part of the Other Contaminated Sources IRA. From 1947 to 1978, STF tanks 464A, 464B, and others were used intermittently to store bicycloheptadiene (BCHPD) and dicyclopentadiene (DCPD) bottoms generated from pesticide manufacturing. A number of U.S. Army investigations have revealed ground water contamination originating from the areas of light nonaqueous phase liquid (LNAPL) located near tank 464A. Recent investigations have shown that the STFP does not pose significant risk to public health or the environment. The ROD addresses interim management of migration of the STFP and is consistent with the Final Response Action. The primary contaminants of concern affecting the ground water are VOCs including benzene, toluene, and xylenes. The selected interim remedial action for the site is included.

  11. Transmission Capacity Forum

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Email Address: Name: Organization Entity Type: Select the best fit for your role... Energy Trader Transmission Provider Employee Transmission Purchaser Energy Scheduler...

  12. Power superconducting power transmission cable

    DOE Patents [OSTI]

    Ashworth, Stephen P.

    2003-06-10

    The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

  13. Power superconducting power transmission cable

    DOE Patents [OSTI]

    Ashworth, Stephen P.

    2003-01-01

    The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

  14. Sandia Energy - Transmission Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Grid Integration Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics Grid Integration Transmission Grid Integration Transmission Grid...

  15. Open Access Transmission and Renewable Energy Technologies

    SciTech Connect (OSTI)

    Porter, K.

    1996-09-01

    In April 1996, the Federal Regulatory Commission (PERC) approved Orders 888 and 889 and released a draft rule for public comment on capacity reservation tariffs (CRTs). Order No. 888 requires electric utilities to file transmission tariffs that would allow transmission access to third parties who want to conduct wholesale transactions, and Order No. 889 requires transmission-owning utilities to set up open access, same-time information systems (OASIS), using commercial software and Internet protocols. This paper discusses these Orders in detail, as well as some of the issues before FERC with implications for renewables, which include: transmission pricing; transmission terms and conditions; reassignment of transmission capacity; defining state and FERC jurisdiction over transmission and distribution; the pricing of ancillary services; and the adoption and implementation of independent system operators.

  16. National Electric Transmission Congestion Study - Philadelphia Workshop |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Philadelphia Workshop National Electric Transmission Congestion Study - Philadelphia Workshop On December 6, 2011, DOE hosted a regional pre-study workshop in Philadelphia, PA to receive input and suggestions concerning the National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below. National Electric Transmission Congestion Study Eastern Workshops (83.6 KB) 12-06-11 Congestion Workshop Agenda -

  17. National Electric Transmission Congestion Study - Portland Workshop |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Portland Workshop National Electric Transmission Congestion Study - Portland Workshop On December 13, 2011, DOE hosted a regional pre-study workshop in Portland, OR to receive input and suggestions concerning the National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below. National Electric Transmission Congestion Study Western Workshops (85.19 KB) 12-13-11 CONGESTION WORKSHOP AGENDA - PORTLAND

  18. Regional Operations Research Program for Commercialization of Geothermal Energy in the Rocky Mountain Basin and Range. Final Technical Report, January 1980--March 1981

    SciTech Connect (OSTI)

    1981-07-01

    This report describes the work accomplished from January 1980 to March 1981 in the Regional Operations Research efforts for the Rocky Mountain Basin and Range Geothermal Commercialization Program. The scope of work is as described in New Mexico State University Proposal 80-20-207. The work included continued data acquisition and extension of the data base, enhancement and refinement of the economic models for electric and direct use applications, site-specific and aggregated analyses in support of the state teams, special analyses in support of several federal agencies, and marketing assistance to the state commercialization teams.

  19. Application for Presidential Permit OE Docket No. PP-334 Baja Wind Transmission, LLC

    Broader source: Energy.gov [DOE]

    Application from Baja Wind Transmission, LLC to construct, operate, and maintain electric transmission facilities at the U.S. - Mexico Border.

  20. Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Roy Stever

    Broader source: Energy.gov [DOE]

    Application from Northern Pass Transmission to construct, operate and maintain electric transmission facilities at the U.S. - Canada  Border.

  1. Tribal Renewable Energy Webinar: Transmission and Grid Basics for Tribal Economic and Energy Development

    Office of Energy Efficiency and Renewable Energy (EERE)

    Attendees will gain knowledge on transmission markets, management, and ownership structures; interconnection request processes and timelines; transmission planning and operations; and fundamentals of the grid.

  2. The integration of renewable energy sources into electric power transmission systems

    SciTech Connect (OSTI)

    Barnes, P.R.; Dykas, W.P.; Kirby, B.J.; Purucker, S.L.; Lawler, J.S.

    1995-07-01

    Renewable energy technologies such as photovoltaics, solar thermal power plants, and wind turbines are nonconventional, environmentally attractive sources of energy that can be considered for electric power generation. Many of the areas with abundant renewable energy resources (very sunny or windy areas) are far removed from major load centers. Although electrical power can be transmitted over long distances of many hundreds of miles through high-voltage transmission lines, power transmission systems often operate near their limits with little excess capacity for new generation sources. This study assesses the available capacity of transmission systems in designated abundant renewable energy resource regions and identifies the requirements for high-capacity plant integration in selected cases. In general, about 50 MW of power from renewable sources can be integrated into existing transmission systems to supply local loads without transmission upgrades beyond the construction of a substation to connect to the grid. Except in the Southwest, significant investment to strengthen transmission systems will be required to support the development of high-capacity renewable sources of 1000 MW or greater in areas remote from major load centers. Cost estimates for new transmission facilities to integrate and dispatch some of these high-capacity renewable sources ranged from several million dollars to approximately one billion dollars, with the latter figure an increase in total investment of 35%, assuming that the renewable source is the only user of the transmission facility.

  3. PP-230-3 International Transmission Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 International Transmission Company PP-230-3 International Transmission Company Presidential permit authorizing International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S-Canadian border. PP-230-3 (1.07 MB) More Documents & Publications Application for Presidential Permit OE Docket No. PP-230-3 International Transmission Company d/b/a ITCTransmission Application for presidential permit OE Docket No. PP-230-2 and PP-230-3 ITC Holdings

  4. Operation Hardtack. Project 1. 9. Loading on buried simulated structures in high-overpressure regions. Report for April-October 1958

    SciTech Connect (OSTI)

    Bultmann, E.H.; McDonough, G.F.; Sinnamon, G.K.

    1984-10-31

    The objective of this project was to study some of the factors affecting the transmission of air-blast-induced pressure through soil and the loading produced on buried structures by such pressures in the high-pressure region (approximately 250 psi). Factors studied were: (1) the attenuation of pressure in a sand deposit when the water table is a few feet below the ground surface; (2) the effect of duration of positive phase of blast on the pressure transmitted through such a soil; (3) the effect of structure flexibility on the pressure acting on structures buried in such a soil; and (4) the relationship between horizontal and vertical pressures in such a soil. The project employed 43 devices, each a rigid cylinder having one rigid end and one deformable-diaphragm end. The devices were buried at depths ranging from 0 to 20 feet at each of two locations at the Eniwetok Proving Ground. The locations were chosen to give a predicted ground surface overpressure of about 250 psi from each of two shots, Cactus and Koa.

  5. 2009 National Electric Transmission Congestion Study Workshops | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Transmission Planning » Congestion Studies » 2009 Congestion Study » 2009 National Electric Transmission Congestion Study Workshops 2009 National Electric Transmission Congestion Study Workshops DOE hosted six regional pre-study workshops in mid-2008 to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study, including comments on practical metrics for gauging levels and significance of transmission congestion. Each workshop featured a

  6. Defect tolerant transmission lithography mask

    DOE Patents [OSTI]

    Vernon, Stephen P.

    2000-01-01

    A transmission lithography mask that utilizes a transparent substrate or a partially transparent membrane as the active region of the mask. A reflective single layer or multilayer coating is deposited on the membrane surface facing the illumination system. The coating is selectively patterned (removed) to form transmissive (bright) regions. Structural imperfections and defects in the coating have negligible effect on the aerial image of the mask master pattern since the coating is used to reflect radiation out of the entrance pupil of the imaging system. Similarly, structural imperfections in the clear regions of the membrane have little influence on the amplitude or phase of the transmitted electromagnetic fields. Since the mask "discards," rather than absorbs, unwanted radiation, it has reduced optical absorption and reduced thermal loading as compared to conventional designs. For EUV applications, the mask circumvents the phase defect problem, and is independent of the thermal load during exposure.

  7. National Electric Transmission Congestion Study 2012 Workshops

    Broader source: Energy.gov [DOE]

    DOE will host four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the National Electric Transmission Congestion Study 2012. For details, please see...

  8. Electrician - Foreman II (Transmission Lines & Substations) ...

    Broader source: Energy.gov (indexed) [DOE]

    Region Transmission Lines and Substation Maintenance (G5200) 615 S. 43rd Avenue Phoenix, AZ 85009 Duty Location is Page, AZ Find out more about living conditions at this...

  9. 2006 Final Transmission Proposal: Revenue Requirements Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2005-06-01

    The purpose of the Revenue Requirement Study (Study) is to establish the level of revenues needed from rates for Bonneville Power Administration's (BPA's) transmission and ancillary services to recover, in accordance with sound business principles, costs associated with the transmission of electric power over the Federal Columbia River Transmission System (FCRTS). The FCRTS is part of the larger Federal Columbia River Power System (FCRPS) which also includes the hydroelectric, multipurpose facilities constructed and operated by the U.S. Army Corps of Engineers and the Bureau of Reclamation in the Pacific Northwest. The FCRPS costs that are not included in the FCRTS costs are funded and repaid through BPA power rates. The transmission revenue requirements herein include: recovery of the Federal investment in transmission and transmission-related assets; the operations and maintenance (O&M) and other annual expenses associated with the provision of transmission and ancillary services; the cost of generation inputs for ancillary services and other between business-line services necessary for the transmission of power; and all other transmission-related costs incurred by the Administrator. The cost evaluation period for this rate proposal includes Fiscal Years (FYs) 2005-2007, the period extending from the last year for which historical information is available through the proposed rate test period. The Study includes the transmission revenue requirements for the rate test period, FYs 2006-2007 (Rate Period) and the results of transmission repayment studies. This Study outlines the policies, forecasts, assumptions, and calculations used to determine BPA's transmission revenue requirements. Legal requirements are summarized in Chapter 5 of this Study. The Revenue Requirement Study Documentation (Documentation), TR-06-FS-BPA-01A, contains key technical assumptions and calculations, the results of the transmission repayment studies, and a further explanation of the

  10. Environmental and economic assessment of discharges from Gulf of Mexico Region oil and gas operations. Quarterly technical progress report, 23 June 1992--30 September 1992

    SciTech Connect (OSTI)

    Gettleson, D.A.

    1992-11-10

    A Sampling and Analysis Plan was prepared and submitted to a Scientific Review Committee for comment. Substantial comments relative to study objectives, sampling design, and sampling periods coupled with the passage of Hurricane Andrew precluded the scheduled initiation of sampling at offshore and coastal sites (Tasks 3 -- Environmental Field Sampling and Analysis of Naturally Occurring Radioactive Materials (NORM), Heavy Metals, and Organics and 4 -- Monitoring of the Recovery of Impacted Wetland and Open Bay Produced Water Discharge Sites in Coastal Louisiana and Texas). A proposed revised schedule has been prepared for Tasks 3 and 4. Task 5 (Assessment of Economic Impacts of Offshore and Coastal Discharge Requirements on Present and Future Operations in the Gulf of Mexico Region), activities have involved identification and collection of the necessary data for the economic analysis. Task 6 (Synthesis of Gulf of Mexico Region Consumption and Use Patterns), activities have included near completion of the literature review and a reevaluation of the data collection efforts relative to the wholesaler, process plant, and restaurant components. Task 7 (Technology Transfer Plan), work has been delayed due to the Tasks 3 and 4 delay and cancellation of the annual US Minerals Management Service Gulf of Mexico Region Information Transfer Meeting.

  11. Transmission Line Jobs and Economic Development Impact (JEDI) Model User Reference Guide

    SciTech Connect (OSTI)

    Goldberg, M.; Keyser, D.

    2013-10-01

    The Jobs and Economic Development Impact (JEDI) models, developed through the National Renewable Energy Laboratory (NREL), are freely available, user-friendly tools that estimate the potential economic impacts of constructing and operating power generation projects for a range of conventional and renewable energy technologies. The Transmission Line JEDI model can be used to field questions about the economic impacts of transmission lines in a given state, region, or local community. This Transmission Line JEDI User Reference Guide was developed to provide basic instruction on operating the model and understanding the results. This guide also provides information on the model's underlying methodology, as well as the parameters and references used to develop the cost data contained in the model.

  12. Revenue reconciled optimum pricing of transmission services

    SciTech Connect (OSTI)

    Perera, B.L.P.P.; Farmer, E.D.; Cory, B.J.

    1996-08-01

    This paper describes a methodology for evaluating an optimal set of transmission prices, to be charged for use of a transmission system on a time-of-use basis. The transmission prices are determined by maximizing the global benefit of using the transmission system that allocates both capacity and operational costs. The security considerations are explicitly taken into account by incorporating security factors in the algorithm. The important issue of revenue recovery by the transmission utility is addressed by modifying the optimum prices without affecting the consumer behavior. This can be achieved by setting the prices within indifference intervals over which consumers are insensitive to transmission prices. Application of the methodology is illustrated on the IEEE 24 bus test system.

  13. International 345 kV transmission line to Highgate, Vermont: environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1985-02-01

    The action under consideration is the issuance of a Presidential permit to the Vermont Electric Power Company, Inc. (VELCO) for the construction, operation, maintenance and connection of a facility that will cross the United States-Canada border for international transmission of electric energy. The proposed transmission facilities will consist of a 7.5 mile, alternating current (ac) transmission line and a 200 MW back-to-back direct current (dc) converter terminal station. None of the facilities will involve any polluting emissions. The construction and maintenance of the proposed converter terminal station and transmission facilities will have little or no impact on the geologic features of the region. The transmission line will have little or no effect on agricultural land. Impacts on commercial forestry in the area will be minimal. The proposed route will require clearing about 36 acres of forest. The proposed transmission line and converter terminal site will have no effect on recreational activities, mining activites, residential, commercial, or industrial land use. The proposed corridor will have a minimal impact on area terrestrial wildlife and plant communities. The proposed project will have little or no impact on future population distribution, the operation of local services, employment and economic benefit, or housing in either Franklin or Highgate. 16 references, 3 figures. (ACR)

  14. PP-334 Energia Sierra Juarez U.S. Transmission, LLC

    Broader source: Energy.gov [DOE]

    Presidential Permit authorizing Energia Sierra Juarez (ESJ) to construct, operate and maintain electric transmission facilities at the U.S. - Mexico border.

  15. Hydrogen Delivery Technologies and Systems- Pipeline Transmission of Hydrogen

    Broader source: Energy.gov [DOE]

    Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen. Design and operations standards and materials for hydrogen and natural gas pipelines.

  16. Environmental and economic assessment of discharges from Gulf of Mexico region oil and gas operations. Quarterly technical progress report, April 1995--June 1995

    SciTech Connect (OSTI)

    Gettleson, D.A.

    1995-07-31

    Progress is described on the determination of environmental impacts from waste discharges to the aquatic ecosystems from oil and gas operations. Task 2 (Preparation of the Sampling and Analysis Plan) activities involved revisions and additions to the Sampling and Analysis Plan. Task 3 (Environmental Field Sampling and Analysis of NORM, Heavy Metals, and Organics) work included analyses of water, sediment, and tissue samples as well as data management. Task 4 (Monitoring of the Recovery of Impacted Wetland and Open Bay Produced Water Discharge Sites in Coastal Louisiana and Texas) activities involved the continued analyses of samples and conducting field sampling at Bay de Chene. Task 5 (Assessment of Economic Impacts of Offshore and Coastal Discharge Requirements on Present and Future Operations in the Gulf of Mexico Region) activities included preparing a draft final report and review by the Scientific Review Committee (SRC). Task 6 (Synthesis of Gulf of Mexico Seafood Consumption and Use Patterns) work involved the preparation of the draft final report and review by the SRC. Task 7 (Technology Transfer Plan) activities involved the presentation of four papers. Task 8 (Project Management and Deliverables) activities involved the submission of the necessary reports and routine management.

  17. Environmental and economic assessment of discharges from Gulf of Mexico region oil and gas operations. Quarterly technical progress report, July--September 1995

    SciTech Connect (OSTI)

    Gettleson, D.A.

    1995-10-31

    Continental Shelf Associates, Inc. (CSA) was contracted to conduct a three-year study of the environmental and health related impacts of produced water and sand discharges from oil and gas operations. Data on naturally occurring radioactive materials (NORM), heavy metals, and hydrocarbons in water, sediment, and biota will be collected and evaluated. Health related impacts will be studied through field collections and analyses of commercially- and recreationally-important fish and shellfish tissues. Additionally, information on seafood catch, consumption, and use patterns for the Gulf of Mexico will be gathered and analyzed. The facilities to be studied will include both offshore and coastal facilities in the Gulf of Mexico. Coastal sites will be additionally studied to determine ecological recovery of impacted wetland and open bay areas. The economic impact of existing and proposed effluent federal and state regulations will also be evaluated. This report represents the thirteenth quarterly technical summary for the study ``Environmental and Economic Assessment of Discharges from Gulf of Mexico Region Oil and Gas Operations.`` Activities associated with Tasks 3 through 8 are discussed in this report.

  18. Midwest Transmission Workshop II Summary

    SciTech Connect (OSTI)

    Kevin Bryan

    2002-12-05

    OAK-B135 After introductions of all participants, Abby Arnold, RESOLVE, reviewed the purpose of the meeting and the agenda. The purpose of the workshop was to share the results of the Midwest Independent System Operator (MISO) scenario development for wind and other fuel sources and the corresponding implications for transmission throughout the MISO control area. The workshop agenda is included in Attachment A.

  19. Joint transmission system projects to improve system reliability

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    County PUD, 425-783-8444 Joint transmission system projects to improve system reliability First major regional electric grid improvements in decades prepare the area for the...

  20. Full Text of the National Electric Transmission Congestion Study...

    Broader source: Energy.gov (indexed) [DOE]

    ... solutions to congestion problems DOE expects that regional transmission planning organizations will continue ... and improved energy supply in the event of an emergency? ...

  1. DOE Issues Two Draft National Interest Electric Transmission...

    Office of Environmental Management (EM)

    ... of all options available to meet local, regional and national demand, which includes more local generation, transmission capacity, demand response, and energy efficiency measures. ...

  2. U.S. Department of Energy 2012 National Electric Transmission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Grid Price signal to incent investment in local generation orand regional transmission orand increased energy ... Carefully Considering DOE Electricity Advisory Committee ...

  3. Transmission Services WIST Task Force Dynamic Transfer Capability...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ("WIST"), a Task Force of technical staff primarily from Northwest and California transmission providers and sub-regional entities, completed a report documenting Phase 1 of its...

  4. State transmission infrastructure authorities: the story so far

    SciTech Connect (OSTI)

    Porter, Kevin; Fink, Sari

    2009-03-15

    State transmission infrastructure authorities offer a new tool for helping to overcome such obstacles to developing transmission as high capital investment requirements, uncertain cost allocation among multiple parties, and siting and permitting challenges. Yet to be determined is whether they can help stimulate large, multi-state regional transmission projects. (author)

  5. Environmental and economic assessment of discharges from Gulf of Mexico Region oil and gas operations. Quarterly technical progress report, 1 October--31 December 1992

    SciTech Connect (OSTI)

    Gettleson, D.A.

    1993-01-18

    Tasks 3 (Environmental Field Sampling and Analysis of naturally occurring radioactive materials (NORM), Heavy Metals, and Organics) and 4 (Monitoring of the Recovery of Impacted Wetland and Open Bay Produced Water Discharge Sites in Coastal Louisiana and Texas) activities have included the narrowing of the list of potential offshore platforms for study off Louisiana and Texas and a preliminary selection of three coastal sites in Louisiana. After an extensive search effort, it was concluded that no coastal sites are available in Texas. A meeting was held between the contractor, Department of Energy (DOE), and Brookhaven National Laboratory (BNL) personnel to discuss potential sites and sampling designs. A letter was sent to the Scientific Review Committee (SRC) providing a general description of the revised site selection process and sampling designs. Task 5 (Assessment of Economic Impacts of Offshore and Coastal Discharge Requirements on Present and Future Operations in the Gulf of Mexico Region) activities included continued evaluation of data types available for the economic analysis. Historical field basis data were acquired. The identification of permitted discharge points was also initiated. Task 6 (Synthesis of Gulf of Mexico Seafood Consumption and Use Patterns) activities have involved the completion of the literature review. Drafts of the fisherman and wholesaler surveys were prepared. It was determined with DOE and BNL personnel that the retailer survey would be eliminated and a subsistence fisherman survey would be added. Task 7 (Technology Transfer Plan) work has been delayed due to the Tasks 3 and 4 delay and cancellation of the annual US Minerals Management Service (MMS) Gulf of Mexico Region Information Transfer Meeting. Task 8 (Project Management and Deliverables) activities have involved the submission of the necessary reports and routine management.

  6. Transmission Bottleneck Project Report. March 19, 2003 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Bottleneck Project Report. March 19, 2003 Transmission Bottleneck Project Report. March 19, 2003 The U.S. Department of Energy (DOE) National Transmission Grid Study (DOE 2002) determined that congestion in the U.S. electricity transmission system places daily constraints on electricity trade, increasing both electricity costs to consumers and impacts reliable operations. In an effort to support DOE's investigation of transmission bottlenecks, the Consortium for Electric Reliability

  7. 2015 National Electric Transmission Congestion Study | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Electric Transmission Congestion Study 2015 National Electric Transmission Congestion Study Section 1221(a) of the Energy Policy Act of 2005, codified at 16 U.S.C. 824p(a), directs the Secretary of Energy to conduct an electric transmission congestion study every three years, and to prepare it in consultation with affected states and regional reliability organizations. In the study, the Department seeks to provide information about transmission congestion. The Department has published

  8. Application for presidential permit OE Docket No. PP-334 Baja Wind U.S Transmission LLC: Update

    Broader source: Energy.gov [DOE]

    Application from Baja Wind U.S Transmission LLC to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border.

  9. Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and British Columbia Hydro and Power Authority

    Broader source: Energy.gov [DOE]

    Application from British Columbia Transmission Corporation and British Columbia Hydro and Power Authority to construct, operate, and maintain electric transmission facilities at the U.S. - Canada...

  10. Energy Transmission and Infrastructure

    SciTech Connect (OSTI)

    Mathison, Jane

    2012-12-31

    The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers

  11. NREL: Transmission Grid Integration - Publications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Publications Want updates about future transmission grid integration webinars and ... and Transmission Study Flexible Energy Scheduling Tool for Integration of ...

  12. Series Transmission Line Transformer

    DOE Patents [OSTI]

    Buckles, Robert A.; Booth, Rex; Yen, Boris T.

    2004-06-29

    A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

  13. Reduced Form of Detailed Modeling of Wind Transmission and Intermitten...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WinDS to calculate transmission distances, as well as the benefits of dispersed wind farms supplying power to a demand region. 3 Figure 2. Regions within WinDS As shown in...

  14. Current Transmission Rates

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases Rate Information Current Power Rates Current Transmission Rates...

  15. Previous Transmission Rates

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases Rate Information Current Power Rates Current Transmission Rates...

  16. 2012 Transmission Rate Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014 Transmission, Ancillary, and Control Area Service Rate Schedules and General Rate Schedule Provisions (FY 2014-2015) October 2013 United States Department of Energy...

  17. Collaborative Transmission Technology Roadmap

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Addendum to the Collaborative Transmission Technology Roadmap March 2014 Bonneville Power Administration Enhanced PDF Functionality Functionality of the PDF version of this...

  18. Transmission - Contact Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact-Information-Transmission Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects &...

  19. Transmission Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Energy, SMART Grid, Systems Analysis, Transmission Grid Integration, Wind Energy Sandia Contributes to International Electrotechnical Commission IEC 61400-26 Availability ...

  20. Concurrent Wind Cooling in Power Transmission Lines

    SciTech Connect (OSTI)

    Jake P Gentle

    2012-08-01

    Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

  1. Solar collector having a solid transmission medium

    DOE Patents [OSTI]

    Schertz, William W.; Zwerdling, Solomon

    1977-06-14

    There is provided a radiant energy transmission device capable of operation in a concentrative mode in which energy incident on an entrance area is directed toward and concentrated on an exit area of smaller area than the entrance area. The device includes a solid radiant energy transmission medium having surfaces coincident with the entrance and exit areas and particularly contoured reflective side walls. The surface coinciding with the entrance area is coupled to a cover plate formed of a radiant energy transmissive material. An energy transducer is coupled to the surface of the medium coinciding with the exit area.

  2. Methods, apparatus, and systems for monitoring transmission systems

    SciTech Connect (OSTI)

    Polk, Robert E; Svoboda, John M; West, Phillip B; Heath, Gail L; Scott, Clark L

    2015-01-27

    A sensing platform for monitoring a transmission system, and method therefor, may include a sensor that senses one or more conditions relating to a condition of the transmission system and/or the condition of an environment around the transmission system. A control system operatively associated with the sensor produces output data based on an output signal produced by the sensor. A transmitter operatively associated with the control system transmits the output data from the control system.

  3. Methods, apparatus, and systems for monitoring transmission systems

    DOE Patents [OSTI]

    Polk, Robert E. [Idaho Falls, ID; Svoboda, John M. [Idaho Falls, ID; West, Phillip B. [Idaho Falls, ID; Heath, Gail L. [Iona, ID; Scott, Clark L. [Idaho Falls, ID

    2010-08-31

    A sensing platform for monitoring a transmission system, and method therefor, may include a sensor that senses one or more conditions relating to a condition of the transmission system and/or the condition of an environment around the transmission system. A control system operatively associated with the sensor produces output data based on an output signal produced by the sensor. A transmitter operatively associated with the control system transmits the output data from the control system.

  4. Transmission Line Security Monitor

    ScienceCinema (OSTI)

    None

    2013-05-28

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  5. Transmission Line Security Monitor

    SciTech Connect (OSTI)

    2011-01-01

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  6. PP-76-1 The Vermont Electric Transmission Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    76-1 The Vermont Electric Transmission Company PP-76-1 The Vermont Electric Transmission Company Presidential Permit authorizing The Vermont Electric Transmission Company to construct, operate, and maintain transmission facilities at the U.S. - Canada Border PP-76-1 The Vermont Electric Transmission Company (1.18 MB) More Documents & Publications PP-76 The Vermont Electric Transmission Company PP-69 Vermont Electric Cooperative, Inc. PP-66-1 Vermont Electric Power Company, Inc.

  7. EC Transmission Line Risk Identification and Analysis

    SciTech Connect (OSTI)

    Bigelow, Tim S

    2012-04-01

    The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

  8. Engine brake control in automatic transmission

    SciTech Connect (OSTI)

    Hayasaki, K.; Sugano, K.

    1988-09-13

    This patent describes an engine braking control for a transmission for an automotive vehicle having an engine, the transmission including an input member drivingly coupled to the engine and an output member subject to load from driving wheels of the automotive vehicle, the transmission also including a first rotary member, a second rotary member, a hydraulically operated clutch selectively establishing a drive connection between the first rotary member and the second rotary member, and a one-way clutch arranged in parallel to the hydraulically operated clutch such that when the hydraulically operated clutch is released, the one-way clutch transmits forward torque from the first rotary member to the second rotary member, but interrupts transmission of revers torque to the first rotary member from the second rotary member, the engine braking control comprising: means for providing an engine braking command fluid pressure signal when demanded by a vehicle operator; a valve means for normally discharging hydraulic fluid from the hydraulically operated clutch to deactivate the hydraulically operated clutch, the valve means being fluidly connected to the hydraulically operated clutch, the engine braking command fluid pressure signal providing means and a drain port. The valve means including a valve spool having a first position where the hydraulically operated clutch is allowed to communicate with the drain port to permit discharge of hydraulic fluid therefrom and thus the hydraulically operated clutch is caused to be deactivated and a second position where the hydraulically operated clutch is disconnected from the drain port and allowed to communicate with the engine braking command fluid pressure signal.

  9. Coiled transmission line pulse generators

    DOE Patents [OSTI]

    McDonald, Kenneth Fox

    2010-11-09

    Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

  10. 2015 National Electric Transmission Congestion Study

    Broader source: Energy.gov [DOE]

    Section 1221(a) of the Energy Policy Act of 2005, codified at 16 U.S.C. 824p(a), directs the Secretary of Energy to conduct an electric transmission congestion study every three years, and to prepare it in consultation with affected states and regional reliability organizations. In the study, the Department seeks to provide information about transmission congestion by focusing on specific indications of transmission constraints and congestion and their consequences. The study focuses on a specific time frame – e.g., historical trends over the past few years, and looking forward three to five years. The study is based entirely on publicly-available data and transmission-related documents. The Department has published two previous congestion studies, one in 2006 and another in 2009.

  11. Electric Transmission System Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System ... Can we agree on several key design attributes for the future grid? Taking Action in the ...

  12. Downhole transmission system

    DOE Patents [OSTI]

    Hall, David R.; Fox, Joe

    2008-01-15

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

  13. Electricity Transmission, A Primer

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... the power from low-cost, mine- mouth coal power plants and wind generators in Wyoming. ... As a result, the transmission system helps to insulate electricity consumers from the ...

  14. Down hole transmission system

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

    2007-07-24

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

  15. Transmission Grid Integration

    Office of Energy Efficiency and Renewable Energy (EERE)

    The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

  16. Transmission SEAB Presentation

    Broader source: Energy.gov (indexed) [DOE]

    "05 * Nine Agency MOU - Oct. 2009 * Transmission Cabinet * Designated 7 Pilot Projects DOD CEQ FERC USDA DOE ACHP EPA DOI DOC RRTT Pilot Projects RRTT Rapid Response Team for ...

  17. Bonneville Project Act, Federal Columbia River Transmission System Act and Other Related Legislation.

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    Legislative texts are provided for: Bonneville Project Act which authorizes the completion, maintenance, and operation of Bonneville project for navigation, and for other purposes; Federal Columbia River Transmission system Act which enables the Secretary of the Interior to provide for operation, maintenance, and continued construction of the Federal transmission system in the Pacific Northwest by use of the revenues of the Federal Columbia River Power System and the proceeds of revenue bonds, and for other purposes; public law 88--552 which guarantees electric consumers of the Pacific Northwest first call on electric energy generated at Federal hydroelectric plants in that regions and reciprocal priority, and for other purposes; and public law 78--329 which provides for the partial construction of the Hungary Horse Dam on the South Fork of the Flathead River in the state of Montana, and for other purposes

  18. Transmission Developers Inc.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ' % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of

  19. Transmission Infrastructure Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TRANSMISSION INFRASTRUCTURE PROGRAM DOE Tribal Energy Summit 2015 SECRETARYOF ENERGY'S FINANCING ROUNDTABLE Tracey A. LeBeau Senior Vice President & Transmission Infrastructure Program Manager 1 Program Description Western's Loan Authority * $3.25 billion permanent authority (revolving) * Goal: Attract investment in infrastructure & address market needs * Commercial underwriting standards TIP Portfolio Management Fundamentals * Reflective of Market Need(s) * Ensure Funds Revolve 2 Recent

  20. National transmission grid study

    SciTech Connect (OSTI)

    Abraham, Spencer

    2003-05-31

    The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE’s Policy Office Electricity Modeling System (POEMS). DOE’s analysis, presented in Section 2, confirms the central role of the nation’s transmission system in lowering costs to consumers through increased trade. More importantly, DOE’s analysis also confirms the results of previous studies, which show that transmission bottlenecks and related transmission system market practices are adding hundreds of millions of dollars to consumers’ electricity bills each year. A more detailed technical overview of the use of POEMS is provided in Appendix A. DOE led an extensive, open, public input process and heard a wide range of comments and recommendations that have all been considered.1 More than 150 participants registered for three public workshops held in Detroit, MI (September 24, 2001); Atlanta, GA (September 26, 2001); and Phoenix, AZ (September 28, 2001).

  1. Ancillary-service details: operating reserves

    SciTech Connect (OSTI)

    Hirst, E.; Kirby, B.

    1997-11-01

    Operating reserves are the front lines in the defense of bulk-power systems against major generation and transmission outages. Operating reserves are provided by generating units that can increase their output rapidly to restore the system to generation/load balance after a major disturbance occurs. Dramatic changes are under way in the U.S. electricity sector, in particular the unbundling of generation from transmission and the increasingly competitive nature of bulk-power markets. Therefore, it is important to revisit the industry`s definitions of, procurement of, and payment for operating reserves. The procedures traditionally used by vertically integrated utilities may not serve the needs of an increasingly fragmented and competitive electricity industry. This report examines the past and current functions of, as well as the national and regional requirements for, operating reserves. We examine the data and analysis that support minimum-operating-reserve requirements. We obtained data on the number and severity of generator outages for three large U.S. electrical systems, including a power pool, a regional reliability council, and a utility. These limited data sets show a range of 15 to 40 major (>500 MW) outages a year for systems ranging in size from 20, 000 MW to 48,000 MW of peak demand. Finally, we discuss several emerging issues related to the underlying technical support for minimum operating-reserve requirements, alternative ways to pay for these reserves, the data needed to support the analysis of these requirements, and the mix of functions that are currently included within operating reserves.

  2. Transmission Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented

  3. ITC Transmission | Open Energy Information

    Open Energy Info (EERE)

    ITC Transmission Jump to: navigation, search Name: ITC Transmission Place: Michigan Phone Number: Western Michigan Office: (269) 792-7223 -- Northern Michigan Office: (989)...

  4. Methods and systems for micro transmissions

    SciTech Connect (OSTI)

    Stalford, Harold L

    2014-12-23

    Methods and systems for micro transmissions for a micro machine may comprise an input shaft assembly coupled to a micro actuator, an output shaft assembly coupled to a micro shaft, and one or more power conversion elements operable to convert a first type of movement from the micro actuator into a second, disparate type of movement for the micro shaft.

  5. EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

  6. Natural Gas Transmission and Distribution Module

    U.S. Energy Information Administration (EIA) Indexed Site

    www.eia.gov Joe Benneche July 31, 2012, Washington, DC Major assumption changes for AEO2013 Oil and Gas Working Group Natural Gas Transmission and Distribution Module DRAFT WORKING GROUP PRESENTATION DO NOT QUOTE OR CITE Overview 2 Joe Benneche, Washington, DC, July 31, 2012 * Replace regional natural gas wellhead price projections with regional spot price projections * Pricing of natural gas vehicles fuels (CNG and LNG) * Methodology for modeling exports of LNG * Assumptions on charges related

  7. National Electric Transmission Congestion Study Workshops

    Broader source: Energy.gov [DOE]

    DOE hosted four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the National Electric Transmission Congestion Study. For details, please select a workshop, below. Agendas, presentations, and transcripts are available on the individual workshop pages; please select a workshop from the list below.

  8. Superfund record of decision (EPA Region 8): Smeltertown Site, Operable Unit 2, former Koppers Wood Treating site, Salida, CO, June 4, 1998

    SciTech Connect (OSTI)

    1998-10-01

    This decision document presents the selected remedial action (RA) for the former Koppers Wood Treating Operable Unit (OU2) at the Smeltertown Superfund Site (the Site). This action addresses the wood-treating contaminants from the tie treating operations at the former Koppers Wood Treating Operable Unit that were conducted by Koppers Company, Inc. (now known as Beazer East, Inc.) from 1924 through 1953. This remedy calls for the containment of soils contaminated at low levels and monitors the effect of the contaminants in the soils, dissolved polycyclic aromatic hydrocarbon (PAHs) and dense non-aqueous phase liquids (DNAPL) within the groundwater.

  9. Operating Experience Summaries | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    June 19, 2014 Operating Experience Summary - 2014-03 - June 19, 2014 Inside this issue: Wilson Construction Company Crew Foreman Receives Fatal Shock during Transmission Line ...

  10. National Electric Transmission Congestion Study - St. Louis Workshop |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy St. Louis Workshop National Electric Transmission Congestion Study - St. Louis Workshop On December 8, 2011, DOE hosted a regional pre-study workshop in St. Louis, MO to receive input and suggestions concerning the National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below. National Electric Transmission Congestion Study Eastern Workshops (89.81 KB) 12-08-11 Congestion Workshop Agenda - St Louis

  11. 2009 National Electric Transmission Congestion Study - Atlanta Workshop |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Atlanta Workshop 2009 National Electric Transmission Congestion Study - Atlanta Workshop On July 29, 2008, DOE hosted a regional pre-study workshop in Atlanta, GA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda and full transcript are available below. 7-29-08 Congestion Workshop Agenda - Atlanta, GA.pdf (17.48 KB) Transcript - 2009 National Electric Transmission Congestion Study Atlanta Workshop.pdf (205.97

  12. 2009 National Electric Transmission Congestion Study - Las Vegas Workshop |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Las Vegas Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop On August 6, 2008, DOE hosted a regional pre-study workshop in Las Vegas, NV to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda and full transcript available below. 8-06-08 Congestion Workshop Agenda - Las Vegas, NV.pdf (17.51 KB) Transcript - 2009 National Electric Transmission Congestion Study Las Vegas Workshop.pdf

  13. Application to Amend Presidential Permit OE Docket No. PP-022-4 British Columbia Transmission Corporation: Federal Register Notice Volume 72, No. 78- Apr. 24, 2007

    Broader source: Energy.gov [DOE]

    Application from British Columbia Transmission Corporation to amend Presidential Permit to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border: Federal...

  14. Transmission line capital costs

    SciTech Connect (OSTI)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

  15. Amended Application for Presidential Permit OE Docket No: PP–371 Northern Pass Transmission LLC

    Broader source: Energy.gov [DOE]

    Northern Pass Transmission LLC (Northern Pass) has submitted an amended application for a Presidential permit to construct, operate, maintain, and connect an electric transmission line across the United States border with Canada.

  16. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

    1991-08-27

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

  17. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, Hiroyuki; Lin-Liu, Yuh-Ren; DeGrassie, John S.

    1991-01-01

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

  18. Superfund Record of Decision (EPA Region 8): Anaconda Smelter site, (Operable Unit 11 - Flue Dust), Deer Lodge County, Anaconda, MT. (Second remedial action), September 1991

    SciTech Connect (OSTI)

    Not Available

    1991-09-23

    The 6,000-acre Anaconda Smelter site is a former copper and ore processing facility in Deer Lodge County, Montana. Land use in the area is predominantly residential. The site is bounded on the north and east, respectively, by the Warm Springs Creek and Mill Creek, both of which are potential sources of drinking water. From 1884 until 1980 when activities ceased, the site was used for ore processing and smelting operations. In 1988, EPA conducted an investigation to determine the nature and extent of the flue dust contamination. A 1988 ROD addressed the Mill Creek Operable Unit (OU15) and documented the relocation of residents from the community surrounding the smelter site as the selected remedial action. The Record of Decision (ROD) addresses the Flue Dust Operable Unit (OU11). The primary contaminants of concern affecting this site from the flue dust materials are metals including arsenic, cadmium, and lead. The selected remedial action for the site is included.

  19. 10 Year Transmission Plan for the Western Electricity Interconnection Released

    Broader source: Energy.gov [DOE]

    The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities.

  20. Operations Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Blackstart Resource Testing Requirements Geomagnetically Induced Currents in BPA Transformers BPA Area Control Error (ACE) Annual Reports Transmission Services supports...

  1. Autonomous data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, O.M.

    1997-03-25

    A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

  2. Autonomous data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

    1997-01-01

    A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

  3. Borehole data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, Oleg M.

    1993-01-01

    A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

  4. Borehole data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, O.M.

    1993-03-23

    A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

  5. Superfund Record of Decision (EPA Region 8): F.E. Warren Air Force Base, Operable Unit 2, Cheyenne, WY, September 30, 1997

    SciTech Connect (OSTI)

    1998-01-01

    The site name is F. E. Warren Air Force Base (FEW), and it is located in Cheyenne, Wyoming. This site was placed on the National Priorities List (NPL) in February 1990. This Record of Decision (ROM) addresses the interim remedial action (IRA) at Operable Unit (OU) 2.

  6. Trends In U.S. Electric Power Transmission

    SciTech Connect (OSTI)

    NONE

    2007-11-15

    The report provides an overview of the changes that are occurring in the industry to implement the goals of improved reliability and reduced congestion costs. As the electric industry works to become a more efficient market, transmission stands as a key link between the competitive generation and the regulated distribution sectors. In this role as a key link, transmission is a major focus of government efforts to improve reliability and reduce congestion costs. The scope of the report is to analyze the dominant reliability, investment, siting, and competition/open access trends that are occurring in the domestic electric transmission industry. Topics covered include: the impact of the 2003 Northeast blackout on reliability rules; the move from voluntary to mandatory reliability standards; the advent of real-time transmission system monitoring; ISO/RTO efforts to improve system reliability; the drivers of government intervention in transmission investment; the move towards incentive-based rates for transmission investment; legislative and regulatory efforts to spur transmission investment to support renewable energy resources; the emergence of merchant transmission; the need for federal backstop authority on regional transmission projects; the designation of national interest electric transmission corridors; FERC Orders on siting transmission; the need for changes in open access and competition regulations; FERC efforts to increase open access and competition; legislative efforts to increase competition; and, current competitive issues in the industry.

  7. EA-1880: Big Bend to Witten Transmission Line Project, South...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to construct, own, and operate an approximately 70-mile long 230-kV single-circuit transmission line that would connect a new switchyard with the existing Witten Substation. ...

  8. EIS-0106: Great Falls-Conrad Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration prepared this EIS to evaluate the environmental impacts of the construction and operation of a 230-kilovolt transmission line from Great Falls, Montana, to Conrad, Montana.

  9. Generation and Transmission Maximization Model

    Energy Science and Technology Software Center (OSTI)

    2001-04-05

    GTMax was developed to study complex marketing and system operational issues facing electric utility power systems. The model maximizes the value of the electric system taking into account not only a single system''s limited energy and transmission resources but also firm contracts, independent power producer (IPP) agreements, and bulk power transaction opportunities on the spot market. GTMax maximizes net revenues of power systems by finding a solution that increases income while keeping expenses at amore » minimum. It does this while ensuring that market transactions and system operations are within the physical and institutional limitations of the power system. When multiple systems are simulated, GTMax identifies utilities that can successfully compete on the market by tracking hourly energy transactions, costs, and revenues. Some limitations that are modeled are power plant seasonal capabilities and terms specified in firm and IPP contracts. GTMax also considers detaile operational limitations such as power plant ramp rates and hydropower reservoir constraints.« less

  10. 2009 National Electric Transmission Congestion Study- Oklahoma City Workshop

    Broader source: Energy.gov [DOE]

    On June 18, 2008, DOE hosted a regional pre-study workshop in Oklahoma City, OK to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda,...

  11. July 31 Webinar to Provide Guidance on Transmission Feasibility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 24, 2013 - 10:32am Addthis The U.S. Department of ... requirements. Gayle Nansel, Transmission System Planning Manager for WAPA's Upper Great Plains Region, will highlight ...

  12. 2009 National Electric Transmission Congestion Study- Hartford Workshop

    Office of Energy Efficiency and Renewable Energy (EERE)

    On July 9, 2008, DOE hosted a regional pre-study workshop in Hartford, CT to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full...

  13. 2009 National Electric Transmission Congestion Study - Las Vegas...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Las Vegas Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop On August 6, 2008, DOE hosted a regional pre-study workshop in Las Vegas, NV to ...

  14. EIS-0377: Big Stone II Power Plant and Transmission Project

    Broader source: Energy.gov [DOE]

    A systems study was carried out to identify the most appropriate locations to interconnect the proposed Big Stone II power plant to the regional utility grid. The study also identified transmission...

  15. 2006 Final Transmission Proposal: Revenue Requirement Study Documentation.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2005-06-01

    The purpose of the Revenue Requirement Study (Study) is to establish the level of revenues needed from rates for Bonneville Power Administration's (BPA's) transmission and ancillary services to recover, in accordance with sound business principles, costs associated with the transmission of electric power over the Federal Columbia River Transmission System (FCRTS). The FCRTS is part of the larger Federal Columbia River Power System (FCRPS) which also includes the hydroelectric, multipurpose facilities constructed and operated by the U.S. Army Corps of Engineers and the Bureau of Reclamation in the Pacific Northwest. The FCRPS costs that are not included in the FCRTS costs are funded and repaid through BPA power rates. The transmission revenue requirements herein include: recovery of the Federal investment in transmission and transmission-related assets; the operations and maintenance (O&M) and other annual expenses associated with the provision of transmission and ancillary services; the cost of generation inputs for ancillary services and other between business-line services necessary for the transmission of power; and all other transmission-related costs incurred by the Administrator. The cost evaluation period for this rate proposal includes Fiscal Years (FYs) 2005-2007, the period extending from the last year for which historical information is available through the proposed rate test period. The Study includes the transmission revenue requirements for the rate test period, FYs 2006-2007 (Rate Period) and the results of transmission repayment studies. This Study outlines the policies, forecasts, assumptions, and calculations used to determine BPA's transmission revenue requirements. Legal requirements are summarized in Chapter 5 of this Study. The Revenue Requirement Study Documentation (Documentation), TR-06-FS-BPA-01A, contains key technical assumptions and calculations, the results of the transmission repayment studies, and a further explanation of the

  16. Transmission and Distribution World March 2007: DOE Focuses on Cyber

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security | Department of Energy Transmission and Distribution World March 2007: DOE Focuses on Cyber Security Transmission and Distribution World March 2007: DOE Focuses on Cyber Security Energy sector owners, operators and system vendors team up to boost control system security with national SCADA test bed. Energy Secrtor Owners, operators and system vendors team up to boost control system security with national SCADA test bed (570.08 KB) More Documents & Publications ABB and Energy

  17. 2015 National Electric Transmission Congestion Study Now Available

    Broader source: Energy.gov [DOE]

    The Office of Electricity Delivery and Energy Reliability has released the 2015 National Electric Transmission Congestion Study. Section 1221(a) of the Energy Policy Act of 2005, codified at 16 U.S.C. 824p(a), directs the Secretary of Energy to conduct an electric transmission congestion study every three years, and to prepare it in consultation with affected states and regional reliability organizations. The Study released today seeks to provide information about transmission congestion by focusing on specific indications of transmission constraints and congestion and their consequences. It focuses primarily on historical trends over the past few years, and looks into the future to the extent possible.

  18. Superfund record of decision (EPA Region 8): Ellsworth Air Force Base, Operable Unit 4, Landfill No. 3 Area, SD, May 16, 1995. Final report

    SciTech Connect (OSTI)

    1996-02-01

    The ROD is for an interim remedial action (IRA) at OU-4 and is the second ROD for EAFB. The scope of the IRA is to reduce the immediate risks posed by the contaminants in ground-water by preventing further transport off-Base and by removing contaminated ground-water which is already off-Base. The IRA includes construction of ground-water wells downgradient of Landfill 3 and wells near the Base property boundary. These wells will be operated to contain the contamination. In addition, the wells will be constructed in the most highly contaminated areas of the off-Base plume and operated to contain and remove this area of off-Base ground-water contamination. Implementation of the IRA will result in partial restoration of the shallow ground-water downgradient of Landfill 3.

  19. Superfund record of decision (EPA Region 1): Fort Devens Sudbury Training Annex, operable units 4 and 5, Middlesex County, MA, September 30, 1996

    SciTech Connect (OSTI)

    1996-11-01

    The decision document presents the decision for No Action at Operable Units (OUs) 4 and 5, Sudbury Training Annex, Middlesex County, Massachusetts. The U.S. Army and USEPA, with concurrence of the Massachusetts Department of Environmental Protection (MADEP), have determined that No Action under CERCLA is necessary to address contamination at OU 4 and OU 5. However, the Army will close the septic tank behind Building T104 at OU 5 under state regulations.

  20. Separating transmission from generation: What`s required and why

    SciTech Connect (OSTI)

    Della Valle, A.P.

    1997-03-01

    State and federal regulators and utilities themselves are not yet of one mind on exactly what kind of separation should be required between owners of generation and their transmission facilities. There is a general consensus that open and equal access to the transmission system by buyers and sellers is an essential requirement for the development of a competitive electricity market. There is also a consensus that control of the transmission system by owners of generation assets provides a serious impediment to the development of such a market. The concern is that owners of generation assets may be able to influence generation prices by determining the way the transmission system is used, operated, maintained or expanded. Most parties involved in the restructuring process agree with the basic premise that there is a need to separate or `unbundle` transmission from generation assets. However, not all agree on the type of separation that is required. In the US, actual divestiture has not yet been required in any jurisdiction. Instead, any problems stemming from the joint ownership of transmission and generation assets have, to date, been dealt with through `functional` or `operational` unbundling. The Federal Energy Regulatory Commission has found, at least for now, that functional unbundling of utilities` generation and transmission assets is sufficient to ensure open, non-discriminatory access to the transmission system. On the other hand, the California Public Utilities Commission has opted for operational unbundling through the formation of an Independent System Operator (ISO) which has the operational control of the transmission system. Critics of functional unbundling say that it requires ongoing regulatory oversight in terms of affiliate transactions, pricing etc. Critics of operational unbundling argue that current ISO proposals are inadequate with regard to the level of independence of the ISO and the scope of the functions given to it.

  1. Drill string transmission line

    DOE Patents [OSTI]

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David S.; Bradford, Kline; Fox, Joe

    2006-03-28

    A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

  2. Appendix TFIELD: Transmissivity Fields

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Appendix TFIELD-2014 Transmissivity Fields United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Appendix TFIELD-2014 Table of Contents TFIELD-1.0 Overview of the T-field Development, Calibration, and Mining Modification Process TFIELD-2.0 Geologic Data TFIELD-2.1 Culebra Hydrogeologic Setting TFIELD-2.2 Refinement of Geologic Boundaries TFIELD-2.2.1 Rustler Halite Margins TFIELD-2.2.2 Salado

  3. Hydraulic system for a ratio change transmission

    DOE Patents [OSTI]

    Kalns, Ilmars

    1981-01-01

    Disclosed is a drive assembly (10) for an electrically powered vehicle (12). The assembly includes a transaxle (16) having a two-speed transmission (40) and a drive axle differential (46) disposed in a unitary housing assembly (38), an oil-cooled prime mover or electric motor (14) for driving the transmission input shaft (42), an adapter assembly (24) for supporting the prime mover on the transaxle housing assembly, and a hydraulic system (172) providing pressurized oil flow for cooling and lubricating the electric motor and transaxle and for operating a clutch (84) and a brake (86) in the transmission to shift between the two-speed ratios of the transmission. The adapter assembly allows the prime mover to be supported in several positions on the transaxle housing. The brake is spring-applied and locks the transmission in its low-speed ratio should the hydraulic system fail. The hydraulic system pump is driven by an electric motor (212) independent of the prime mover and transaxle.

  4. Transmission capacity reservations implemented through a spot market with transmission congestion contracts

    SciTech Connect (OSTI)

    Harvey, S.M.; Hogan, W.W.; Pope, S.L.

    1996-11-01

    The capacity reservation open access transmission tariff proposed by the FERC is entirely compatible with a competitive bulk power market. Using a point-to-point reservation approach that does not depend on tracking actual flows, capacity rights trading could be coordinated through the system operator. The capacity reservations would be fully tradeable and would fully support the competitive market. Open access to the transmission grid is a necessary support of a competitive market in electricity generation and supply. A key ingredient of open access is a system of capacity allocations for use of the transmission grid. A unique characteristic of electricity transmission is seen in the difficulty of defining transmission rights and matching these rights in a meaningful way to the actual use of the system. The old procedures from the era of vertically integrated utilities will not suffice for the new world of unbundling and competition. Strong network interactions coupled with user flexibility and choice require a new system of transmission capacity definition, reservation and use. The Federal Energy Regulatory Commission has described a system of point-to-point transmission capacity reservations under the Capacity Reservation Open Access Transmission Tariffs (CRT) proposal. The issues addressed under the proposed CRT are important. In the long run, the CRT could be more important than Order 888, and it offers the key ingredients for the future of a competitive electricity market. However, the FERC faces a significant challenge in developing and explaining the CRT ideas. The CRT proposal has been widely read as a narrow, literal prescription requiring seemingly impossible explicit, decentralized trading of physical transmission rights whose ownership and configuration would have to be rearranged constantly to match the dynamic use of the electric system. Viewed from this narrow perspective, the CRT would present, a host of practical difficulties.

  5. Value-based reliability transmission planning

    SciTech Connect (OSTI)

    Dalton, J.G. III; Garrison, D.L.; Fallon, C.M.

    1996-08-01

    This paper presents a new value-based reliability planning (VBRP) process proposed for planning Duke Power Company`s (DPC) regional transmission system. All transmission served customers are fed from DPC`s regional transmission system which consists of a 44-kV predominantly radial system and a 100-kV predominantly non-radial system. In the past, any single contingency that could occur during system peak conditions and cause a thermal overload required the overloaded facility to be upgraded, regardless of the costs or the likelihood of the overload occurring. The new VBRP process is based on transmission system reliability evaluation and includes the following important elements: (1) a ten-year historical data base describing the probabilities of forced outages for lines and transformers; (2) a five-year average load duration curve describing the probability of an overload should a contingency occur; (3) a customer outage cost data base; (4) and probabilistic techniques. The new process attempts to balance the costs of improving service reliability with the benefits or value that these improvements bring to these customers. The objective is to provide the customers their required level of reliability while minimizing the Total Cost of their electric service.

  6. National Transmission Grid Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... NGC has reduced the costs of congestion through a combination of operational efficiency improvements, improved forecasting, investment in trans- mission expansion, and adoption of ...

  7. GTT 2012 Transmission Workshop- Documents

    Broader source: Energy.gov [DOE]

    Use the links below to download documents from the GTT's Transmission Workshop, held November 1-2, 2012

  8. Geothermal Resources and Transmission Planning

    Broader source: Energy.gov [DOE]

    This project addresses transmission-related barriers to utility-scale deployment of geothermal electric generation technologies.

  9. Application for Presidential Permit OE Docket No. PP-398 Minnesota Power- Great Northern Transmission Line

    Broader source: Energy.gov [DOE]

    State Department Response on the GNTL application to construct, operate, and maintain electric transmission facilities at the U.S. - Canada border.

  10. EIS-0344: Grand Coulee-Bell 500 kV Transmission Line

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's proposed action for the construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project.

  11. Application for Presidential Permit OE Docket No. PP-398 Minnesota Power- Great Northern Transmission Line

    Office of Energy Efficiency and Renewable Energy (EERE)

    Application from Great Northern  (GNTL) to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border.

  12. Enhanced Geothermal Systems (EGS) with CO2as Heat Transmission Fluid

    Broader source: Energy.gov [DOE]

    The overall objective of the research is to explore the feasibility of operating enhanced geothermal systems (EGS) with CO2as heat transmission fluid.

  13. Application for Presidential Permit OE Docket No. PP-398 Minnesota Power- Great Northern Transmission Line

    Office of Energy Efficiency and Renewable Energy (EERE)

    Response letter for GNTL from Department of Defense to construct, operate, and maintain electric transmission facilities at the U.S. - Canada Border.

  14. Superfund record of decision (EPA Region 9): Newmark Groundwater Contamination Superfund Site, Muscoy Plume Operable Unit, San Bernardino, CA, March 24, 1995

    SciTech Connect (OSTI)

    1995-06-01

    The decision document presents the selected remedial action for the Muscoy Plume Operable Unit, Newmark Groundwater Contamination Superfund site. The Muscoy Plume OU is an interim action focusing on contamination in the underground water supply in the Bunker Hill Basin of San Bernardino, west of the Shandin Hills. The remedy involves groundwater extraction (pumping) and treatment of 6,200 gallons per minute (gpm) in San Bernardino at the leading edge of the contaminant plume. All the extracted contaminated groundwater shall be treated to remove Volatile Organic Compounds (VOCs) by either of two proven treatment technologies: granular activated carbon (GAC) filtration or air stripping. The treated water will be transferred to a public water supply agency for distribution. Groundwater monitoring wells will be installed and sampled regularly to help evaluate the effectiveness of the remedy.

  15. Superfund record of decision (EPA Region 1): Fort Devens Sudbury Training Annex, source control operable unit, Middlesex County, MA, September 29, 1995

    SciTech Connect (OSTI)

    1996-03-01

    This Record of Decision (ROD) document presents the selected source control (SC) remedial action at areas of contamination (AOCs) A7 and A9 at the Fort Devens Sudbury Training Annex (Annex), Middlesex County, Massachusetts. The major components of the selected remedy for AOCs A7 and A9 include: Excavation and off-site treatment and disposal of laboratory waste at AOC A7; Excavation of contaminated soil from AOC A9 and consolidation at AOC A7; Consolidation of contaminated soil and solid waste at AOC A7 to within the limits of the landfill cap; Construction of a Resource Conservation and Recovery Act (RCRA) Subtitle C landfill cap at AOC A7; Environmental monitoring and operation and maintenance (O&M) at AOC A7; Institutional controls at AOC A7 to limit future site use and to restrict site access; and Five-year reviews at AOC A7.

  16. The unbundling and rebundling of transmission and market related functions

    SciTech Connect (OSTI)

    Woolf, F.

    1996-12-01

    If generation and transmission are to continue in common hands, transmission ownership must be separated from system operations, necessitating creation of the independent system operator. But this approach can only work if the ISO is truly and totally independent in its role as the gamekeeper of serious market competition and the rules of the game (covering all the ISO functions) are clearly established. In a world where generation, transmission and distribution are restructured or unbundled with the aim of introducing competition at a wholesale and retail level, a number of functions related to system operations must be performed in order to allow the chosen market structure to operate. These functions are the key to putting buyers and sellers together. Indeed, they encompass nearly everything that happens between the power station fence and the customer meter. There has been much analysis of these functions and the services that are derived from them, both in international restructuring and, over the last two years, in North America. In this article the author looks at how transmission and market-related functions have been unbundled and rebundled in an attempt to illustrate some of the factors that should drive decisions as to the optimum grouping of functions and which entities should provide them. In particular the author discusses the separation of transmission ownership from system operations, which is a particular feature of the North American scene in systems where corporate unbundling - i.e., divestiture - of generation and transmission is not being imposed.

  17. WECC releases its first-ever transmission plan for the Western Interconnection

    Broader source: Energy.gov [DOE]

    The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection.

  18. Electricity Transmission, A Primer | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system, the economics, and the policies. Electricity Transmission, A Primer (1.95 MB) More Documents & Publications Draft Chapter 4: Transmission Adequacy Electricity Grid Basics Webinar Presentation Slides and Text Version Chapter 4 Transmission Adequacy

  19. Superfund Record of Decision (EPA Region 3): Rhinehart Tire Fire Dump, Operable Unit 2, Winchester, VA. (Second remedial action), September 1992

    SciTech Connect (OSTI)

    Not Available

    1992-09-29

    The Rhinehart Tire Fire Dump site is located in a 22-acre drainage area of a sparsely populated rural area in western Frederick County, Virginia. Surface water runoff flows into a north-south tributary that discharges to Hogue Creek, which is 4,000 feet downstream. Bedrock is noted to be highly fractured, and the ground water flow in the overburden aquifer is toward Massey Run. From 1972 to 1983, the site owner conducted a tire disposal operation, which consisted of transporting discarded tires from various locations and storing them on a 5-acre wooded slope behind his home. An estimated 5 to 7 million tires that had been accumulated caught on fire in October 1983 and burned until July 1984. As a result of the fire, a free-flowing oily-tar, which contained anthracene, benzene, cadmium, chromium, ethylbenzene, napthalene, nickel, pyrene, toluene, and zinc, began to seep out of the tire pile into Massey Run and on to Hogue Creek.

  20. Operation Greenhouse. Scientific Director's report of atomic-weapon tests at Eniwetok, 1951. Annex 1. 6. Blast measurements. Part 4. Pressure-time measurements in the Mach region. Sections 1 and 2

    SciTech Connect (OSTI)

    Price, J.F.; Sokol, G.M.; Anastasion, S.N.; Vader, R.L.; Walthall, E.R.

    1985-09-01

    The objective of the laboratory and field work described in this report was to make accurate measurements of air blast in the Mach region from two explosions of Operation Greenhouse. Measurements were made at constant height along a single radius on Test Dog and along two different radii for test Easy. In addition, diaphragm-type inductance gages were installed at five different heights on approximately the same radii on test Easy. The spring-piston gage successfully did the job it was designed to do. The diaphragm-type inductance-gage measuring system had an accuracy of 2% in pressure and a resolving time of approximately 1 musec. Complete details concerning equipment design, field operation, and recommendations for future use of the systems are presented.

  1. Colorado Electrical Transmission Grid

    SciTech Connect (OSTI)

    Zehner, Richard E.

    2012-02-01

    Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Originator: Xcel Energy Publication Date: 2012 Title: Colorado XcelEnergy NonXcel Transmission Network Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains transmission network of Colorado Spatial Domain: Extent: Top: 4540689.017558 m Left: 160606.141934 m Right: 758715.946645 m Bottom: 4098910.893397m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shapefile

  2. 2015 National Electric Transmission Congestion Study | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 National Electric Transmission Congestion Study 2015 National Electric Transmission Congestion Study 2015 National Electric Transmission Congestion Study Section 1221(a) of ...

  3. Electricity Transmission, A Primer | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electricity Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the...

  4. RAPID/Bulk Transmission | Open Energy Information

    Open Energy Info (EERE)

    Page Edit History RAPIDBulk Transmission < RAPID(Redirected from RAPIDOverviewBulkTransmission) Redirect page Jump to: navigation, search REDIRECT RAPIDBulkTransmission...

  5. Bordertown to California Transmission | Open Energy Information

    Open Energy Info (EERE)

    Transmission EIS Bordertown to California 120kV Transmission Line Project Environmental Impact Statement General NEPA Document Info Energy Sector Transmission Environmental...

  6. Environmental and economic assessment of discharges from Gulf of Mexico region oil and gas operations. Quarterly technical progress report, April--June 1993

    SciTech Connect (OSTI)

    Gettleson, D.A.

    1993-07-26

    Continental Shelf Associates, Inc. (CSA) was contracted to conduct a three-year study of the environmental and health related impacts of produced water and sand discharges from oil and gas operations. Data on naturally occurring radioactive materials (NORM), heavy metals, and hydrocarbons in water, sediment, and biota will be collected and evaluated. Health related impacts will be studied through field collections and analyses of commercially- and recreationally-important fish and shellfish tissues. Additionally, information on seafood catch, consumption, and use patterns for the Gulf of Mexico will be gathered and analyzed. The facilities to be studied will include both offshore and coastal facilities in the Gulf of Mexico. Coastal sites will be additionally studied to determine ecological recovery of impacted wetland and open bay areas. The economic impact of existing and proposed effluent federal and state regulations will also be evaluated. The primary objectives of the project are to increase the base of scientific knowledge concerning (1) the fate and environmental effects of organics, trace metals, and NORM in water, sediment, and biota near several offshore oil and gas facilities; (2) the characteristics of produced water and produced sand discharges as they pertain to organics, trace metals, and NORM variably found in association with the discharges; (3) the recovery of four terminated produced water discharge sites located in wetland and high-energy open bay sites of coastal Louisiana and Texas; (4) the economic and energy supply impacts of existing and anticipated federal and state offshore and coastal discharge regulations; and (5) the catch, consumption and human use patterns of seafood species collected from coastal and offshore waters. Accomplishments for this period are described.

  7. Scanning Transmission X-ray Microscope Control Program

    Energy Science and Technology Software Center (OSTI)

    2005-08-05

    User Interface and control software or C++ to run on specifically equipped computer running Windows Operating Systems. Program performs specific control functions required to operate Interferometer controlled scanning transmission X-ray microscopes at ALS beamlines 532 and 11.0.2. Graphical user interface facilitates control, display images and spectra.

  8. Dynamic Transmission Electron Microscopy

    SciTech Connect (OSTI)

    Evans, James E.; Jungjohann, K. L.; Browning, Nigel D.

    2012-10-12

    Dynamic transmission electron microscopy (DTEM) combines the benefits of high spatial resolution electron microscopy with the high temporal resolution of ultrafast lasers. The incorporation of these two components into a single instrument provides a perfect platform for in situ observations of material processes. However, previous DTEM applications have focused on observing structural changes occurring in samples exposed to high vacuum. Therefore, in order to expand the pump-probe experimental regime to more natural environmental conditions, in situ gas and liquid chambers must be coupled with Dynamic TEM. This chapter describes the current and future applications of in situ liquid DTEM to permit time-resolved atomic scale observations in an aqueous environment, Although this chapter focuses mostly on in situ liquid imaging, the same research potential exists for in situ gas experiments and the successful integration of these techniques promises new insights for understanding nanoparticle, catalyst and biological protein dynamics with unprecedented spatiotemporal resolution.

  9. Tucson Electric Power Company Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-08-27

    Tucson Electric Power Company (TEP) has applied to the U.S. Department of Energy (DOE) for a Presidential Permit to construct and operate a double-circuit, 345,000-volt (345-kV) electric transmission line across the United States border with Mexico. Under Executive Order (EO) 10485 of September 3, 1953, as amended by EO 12038 of February 3, 1978, a Presidential Permit is required to construct, connect, operate, or maintain facilities at the U.S. international border for the transmission of electric energy between the United States and a foreign country. DOE has determined that the issuance of a Presidential Permit to TEP for the proposed project would constitute a major Federal action that may have a significant impact on the environment within the meaning of the ''National Environmental Policy Act of 1969'' (NEPA) 42 United States Code (U.S.C.) {section}4321 et seq. For this reason, DOE has prepared this Draft Environmental Impact Statement (EIS) to evaluate potential environmental impacts from the proposed Federal action (granting a Presidential Permit for the proposed transmission facilities) and reasonable alternatives, including the No Action Alternative. This EIS was prepared in accordance with Section 102(2)(c) of NEPA, Council of Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508), and DOE NEPA Implementing Procedures (10 CFR 1021). DOE is the lead Federal Agency, as defined by 40 CFR 1501.5. The U.S. Department of Agriculture Forest Service (USFS), the Bureau of Land Management (BLM) of the U.S. Department of the Interior, and the U.S. Section of the International Boundary and Water Commission, U.S. and Mexico (USIBWC), are cooperating agencies. Each of these organizations will use the EIS for its own NEPA purposes, as described in the Federal Agencies' Purpose and Need and Authorizing Actions section of this summary. The 345-kV double-circuit transmission line would consist of twelve transmission line wires, or

  10. Hydromechanical transmission with hydrodynamic drive

    DOE Patents [OSTI]

    Orshansky, Jr., deceased, Elias; Weseloh, William E.

    1979-01-01

    This transmission has a first planetary gear assembly having first input means connected to an input shaft, first output means, and first reaction means, and a second planetary gear assembly having second input means connected to the first input means, second output means, and second reaction means connected directly to the first reaction means by a reaction shaft. First clutch means, when engaged, connect the first output means to an output shaft in a high driving range. A hydrodynamic drive is used; for example, a torque converter, which may or may not have a stationary case, has a pump connected to the second output means, a stator grounded by an overrunning clutch to the case, and a turbine connected to an output member, and may be used in a starting phase. Alternatively, a fluid coupling or other type of hydrodynamic drive may be used. Second clutch means, when engaged, for connecting the output member to the output shaft in a low driving range. A variable-displacement hydraulic unit is mechanically connected to the input shaft, and a fixed-displacement hydraulic unit is mechanically connected to the reaction shaft. The hydraulic units are hydraulically connected together so that when one operates as a pump the other acts as a motor, and vice versa. Both clutch means are connected to the output shaft through a forward-reverse shift arrangement. It is possible to lock out the torque converter after the starting phase is over.

  11. Operating Reserve Implication of Alternative Implementations of an Energy Imbalance Service on Wind Integration in the Western Interconnection: Preprint

    SciTech Connect (OSTI)

    Milligan, M.; Kirby, B.; King, J.; Beuning, S.

    2011-07-01

    During the past few years, there has been significant interest in alternative ways to manage power systems over a larger effective electrical footprint. Large regional transmission organizations in the Eastern Interconnection have effectively consolidated balancing areas, achieving significant economies of scale that result in a reduction in required reserves. Conversely, in the Western Interconnection there are many balancing areas, which will result in challenges if there is significant wind and solar energy development in the region. A recent proposal to the Western Electricity Coordinating Council suggests a regional energy imbalance service (EIS). To evaluate this EIS, a number of analyses are in process or are planned. This paper describes one part of an analysis of the EIS's implication on operating reserves under several alternative scenarios of the market footprint and participation. We improve on the operating reserves method utilized in the Eastern Wind Integration and Transmission Study and apply this modified approach to data from the Western Wind and Solar Integration Study.

  12. 2012 National Electric Transmission Congestion Study: Presentation...

    Energy Savers [EERE]

    2012 National Electric Transmission Congestion Study: Presentation from Congestion Study Webinar Series 2012 National Electric Transmission Congestion Study: Presentation from...

  13. Wide Area Security Region Final Report

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Lu, Shuai; Guo, Xinxin; Gronquist, James; Du, Pengwei; Nguyen, Tony B.; Burns, J. W.

    2010-03-31

    This report develops innovative and efficient methodologies and practical procedures to determine the wide-area security region of a power system, which take into consideration all types of system constraints including thermal, voltage, voltage stability, transient and potentially oscillatory stability limits in the system. The approach expands the idea of transmission system nomograms to a multidimensional case, involving multiple system limits and parameters such as transmission path constraints, zonal generation or load, etc., considered concurrently. The security region boundary is represented using its piecewise approximation with the help of linear inequalities (so called hyperplanes) in a multi-dimensional space, consisting of system parameters that are critical for security analyses. The goal of this approximation is to find a minimum set of hyperplanes that describe the boundary with a given accuracy. Methodologies are also developed to use the security hyperplanes, pre-calculated offline, to determine system security margins in real-time system operations, to identify weak elements in the system, and to calculate key contributing factors and sensitivities to determine the best system controls in real time and to assist in developing remedial actions and transmission system enhancements offline . A prototype program that automates the simulation procedures used to build the set of security hyperplanes has also been developed. The program makes it convenient to update the set of security hyperplanes necessitated by changes in system configurations. A prototype operational tool that uses the security hyperplanes to assess security margins and to calculate optimal control directions in real time has been built to demonstrate the project success. Numerical simulations have been conducted using the full-size Western Electricity Coordinating Council (WECC) system model, and they clearly demonstrated the feasibility and the effectiveness of the developed

  14. A market-based proposal for transmission pricing

    SciTech Connect (OSTI)

    Tabors, R.

    1996-11-01

    FERC has suggested that a capacity reservation tariff system might replace the current pro forma tariffs of Order 888. Use of periodic multi-round auctions, in conjunction with transmission zones and inter-zonal transfer capabilities and an active secondary market, could assure fair and open access and minimize regulatory oversight. This article describes a system for trading in transmission capacity at market-based prices. The proposed system should offer unbundled transmission on a nondiscriminatory open-access basis, consistent with the Federal Energy Regulatory Commission`s Order No. 888. It is also intended to offer that service to all transmission users on the same basis as proposed in the Commission`s pending rulemaking proposal on capacity reservation tariffs (CRTs) in Docket No. RM96-11-000. There are seven primary criteria by which this proposal should be judged. (1) Does the transmission service offered comply with operational unbundling of transmission service and non-discriminatory open access to transmission service? (2) Does the system`s operation produce reliability levels as high as or higher than those that exist today? (3) Does it produce transmission products or services that are discrete from other products or services such that each can be sold independently or be repackaged to constitute a different product or service? (4) Does the system maximize reliance on competitive market forces to set prices for transmission products and services? (5) Are the prices for these products and services known with certainty in advance by their purchasers? (6) Does the system`s pricing mechanism confer flexibility on customers in choosing how to manage price and reliability risks? (7) Does the system accommodate a liquid and flexible secondary market in transmission capacity? The credibility of the proposed restructure or pricing system should require a {open_quotes}yes{close_quotes} answer to each of these seven questions.

  15. AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION

    Broader source: Energy.gov [DOE]

    The agenda for the Quadrennial Energy Review (QER) public stakeholder meeting in New Orleans on petroleum product transmission, distribution, and storage.

  16. Electric Transmission Line Siting Compact

    Office of Environmental Management (EM)

    ... creates a method for states to site multi-state electric transmission lines. Three 4 levels of organization are provided: 5 A state project review panel within each ...

  17. Transmission Expansion in the Midwest

    Broader source: Energy.gov [DOE]

    At this unique forum, participants will hear top executives from the area's RTOs, utilities, transmission developers, and state regulatory agencies discuss and debate the most critical issues...

  18. Transmission Reliability | Department of Energy

    Office of Environmental Management (EM)

    ... Research focuses on five key areas: market design, long-term supply and transmission investment, renewable integration, demand response, and environmental impacts. Researchers use ...

  19. NREL: Transmission Grid Integration - News

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The National Renewable Energy Laboratory (NREL) will be strongly supporting this ... Archives 2015 | 2014 Printable Version Transmission Grid Integration Home Issues Projects ...

  20. NREL: Transmission Grid Integration - Webmaster

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Your message: Send Message Printable Version Transmission Grid Integration Home Issues ... NREL is a national laboratory of the U.S. Department of Energy, Office of Energy ...

  1. DOE Electricity Transmission System Workshop

    Broader source: Energy.gov (indexed) [DOE]

    ... Activities can span from basic R&D through demonstration projects. Parallel Breakout Sessions (see white paper: "DOE Action Plan Addressing the Electricity Transmission System") ...

  2. 2009 National Electric Transmission Congestion Study - Chicago Workshop |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Chicago Workshop 2009 National Electric Transmission Congestion Study - Chicago Workshop On September 17, 2008, DOE hosted a regional pre-study workshop in Chicago, IL to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 9-17-08 Congestion Workshop Agenda - Chicago, IL.pdf (20.2 KB) Transcript - 2009 National

  3. 2009 National Electric Transmission Congestion Study - San Francisco

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workshop | Department of Energy San Francisco Workshop 2009 National Electric Transmission Congestion Study - San Francisco Workshop On June 11, 2008, DOE hosted a regional pre-study workshop in San Francisco, CA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 6-11-08 Congestion Workshop Agenda - San Francisco, CA.pdf (20.4 KB)

  4. 2009 National Electric Transmission Congestion Study Notice of Inquiry:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Register Notice Volume 73, No. 108 - Jun. 4, 2008 | Department of Energy Notice of Inquiry: Federal Register Notice Volume 73, No. 108 - Jun. 4, 2008 2009 National Electric Transmission Congestion Study Notice of Inquiry: Federal Register Notice Volume 73, No. 108 - Jun. 4, 2008 The Federal Register Notice of Inquiry requesting comments and providing notice of six regional workshops for the 2009 National Electric Transmission Congestion Study was issued June 4, 2008. June 4, 2008

  5. Narrow-band optical transmission of metallic nanoslit arrays

    SciTech Connect (OSTI)

    Sun Zhijun; Yang Ying; Zuo Xiaoliu

    2012-10-22

    Metallic nanoslit arrays usually demonstrate wide transmission bands for transverse-magnetic-polarized incidence light. Here, we show that by introducing multi-dielectric layers underneath the metallic structure layer on the substrate, a narrow peak is formed, whose bandwidth can be down to a few nanometers. Three types of resonance modes in the region under the metal layer are identified responsible for the formation of the peak, i.e., a two-dimensional cavity resonance mode, which supports optical transmission, and two in-plane hybrid surface plasmon resonance modes locating on both sides of the peak that suppresses the transmission. Such structures can be applied in advanced photonic devices.

  6. Small passenger car transmission test: Chevrolet Luv transmission

    SciTech Connect (OSTI)

    Bujold, M.P.

    1980-06-01

    The small passenger car transmission test was initiated to supply electric vehicle manufacturers with technical information regarding the performance of commercially available transmissions. This information would enable EV manufacturers to design a more energy efficient vehicle. With this information the manufacturers would be able to estimate vehicle driving range as well as speed and torque requirements for specific roadload performance characteristics. This report covers the 1978 Chevrolet Luv Truck manual transmission. This transmission was tested per a passenger car automatic transmission test code (SAE J65lb) which required drive performance, coast performance, and no load test conditions. The portion of the test code which involved the throttle valve modulation and line pressure were deleted since they did not apply to the manual transmission. Under these test conditions the transmission attained maximum efficiencies in the upper 90% range at rated load for both drive performance tests and coast performance tests. The major results of this test are the torque speed and efficiency curves which are located in the data section of this report. These graphs map the complete performance characteristics for the Chevrolet Luv Truck Manual transmission. This information will facilitate the vehicle manufacturer in the design of a more energy efficient vehicle.

  7. EC Transmission Line Materials

    SciTech Connect (OSTI)

    Bigelow, Tim S

    2012-05-01

    The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

  8. Device for adapting continuously variable transmissions to infinitely variable transmissions with forward-neutral-reverse capabilities

    DOE Patents [OSTI]

    Wilkes, Donald F.; Purvis, James W.; Miller, A. Keith

    1997-01-01

    An infinitely variable transmission is capable of operating between a maximum speed in one direction and a minimum speed in an opposite direction, including a zero output angular velocity, while being supplied with energy at a constant angular velocity. Input energy is divided between a first power path carrying an orbital set of elements and a second path that includes a variable speed adjustment mechanism. The second power path also connects with the orbital set of elements in such a way as to vary the rate of angular rotation thereof. The combined effects of power from the first and second power paths are combined and delivered to an output element by the orbital element set. The transmission can be designed to operate over a preselected ratio of forward to reverse output speeds.

  9. HVDC power transmission technology assessment

    SciTech Connect (OSTI)

    Hauth, R.L.; Tatro, P.J.; Railing, B.D.; Johnson, B.K.; Stewart, J.R.; Fink, J.L.

    1997-04-01

    The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

  10. Electric vehicle drive train with direct coupling transmission

    DOE Patents [OSTI]

    Tankersley, Jerome B.; Boothe, Richard W.; Konrad, Charles E.

    1995-01-01

    An electric vehicle drive train includes an electric motor and an associated speed sensor, a transmission operable in a speed reduction mode or a direct coupled mode, and a controller responsive to the speed sensor for operating the transmission in the speed reduction mode when the motor is below a predetermined value, and for operating the motor in the direct coupled mode when the motor speed is above a predetermined value. The controller reduces the speed of the motor, such as by regeneratively braking the motor, when changing from the speed reduction mode to the direct coupled mode. The motor speed may be increased when changing from the direct coupled mode to the speed reduction mode. The transmission is preferably a single stage planetary gearbox.

  11. Electric vehicle drive train with direct coupling transmission

    DOE Patents [OSTI]

    Tankersley, J.B.; Boothe, R.W.; Konrad, C.E.

    1995-04-04

    An electric vehicle drive train includes an electric motor and an associated speed sensor, a transmission operable in a speed reduction mode or a direct coupled mode, and a controller responsive to the speed sensor for operating the transmission in the speed reduction mode when the motor is below a predetermined value, and for operating the motor in the direct coupled mode when the motor speed is above a predetermined value. The controller reduces the speed of the motor, such as by regeneratively braking the motor, when changing from the speed reduction mode to the direct coupled mode. The motor speed may be increased when changing from the direct coupled mode to the speed reduction mode. The transmission is preferably a single stage planetary gearbox. 6 figures.

  12. Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions

    Broader source: Energy.gov [DOE]

    Historically, manual transmissions have delivered better fuel economy than automatic transmissions. However, improvements in the efficiency of automatic transmissions have closed that gap in recent...

  13. Electrical transmission line diametrical retainer

    DOE Patents [OSTI]

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David; Dahlgren, Scott; Sneddon, Cameron; Briscoe, Michael; Fox, Joe

    2004-12-14

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

  14. Downhole Data Transmission System

    DOE Patents [OSTI]

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David; Dahlgren, Scott; Fox, Joe

    2003-12-30

    A system for transmitting data through a string of downhole components. In one aspect, the system includes first and second magnetically conductive, electrically insulating elements at both ends of the component. Each element includes a first U-shaped trough with a bottom, first and second sides and an opening between the two sides. Electrically conducting coils are located in each trough. An electrical conductor connects the coils in each component. In operation, a varying current applied to a first coil in one component generates a varying magnetic field in the first magnetically conductive, electrically insulating element, which varying magnetic field is conducted to and thereby produces a varying magnetic field in the second magnetically conductive, electrically insulating element of a connected component, which magnetic field thereby generates a varying electrical current in the second coil in the connected component.

  15. Downhole data transmission system

    DOE Patents [OSTI]

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David S; Dahlgren, Scott; Fox, Joe

    2006-06-20

    A system for transmitting data through a string of downhole components. In one aspect, the system includes first and second magnetically conductive, electrically insulating elements at both ends of the component. Each element includes a first U-shaped trough with a bottom, first and second sides and an opening between the two sides. Electrically conducting coils are located in each trough. An electrical conductor connects the coils in each component. In operation, a varying current applied to a first coil in one component generates a varying magnetic field in the first magnetically conductive, electrically insulating element, which varying magnetic field is conducted to and thereby produces a varying magnetic field in the second magnetically conductive, electrically insulating element of a connected component, which magnetic field thereby generates a varying electrical current in the second coil in the connected component.

  16. Impacts of Demand-Side Resources on Electric Transmission Planning

    SciTech Connect (OSTI)

    Hadley, Stanton W.; Sanstad, Alan H.

    2015-01-01

    Will demand resources such as energy efficiency (EE), demand response (DR), and distributed generation (DG) have an impact on electricity transmission requirements? Five drivers for transmission expansion are discussed: interconnection, reliability, economics, replacement, and policy. With that background, we review the results of a set of transmission studies that were conducted between 2010 and 2013 by electricity regulators, industry representatives, and other stakeholders in the three physical interconnections within the United States. These broad-based studies were funded by the US Department of Energy and included scenarios of reduced load growth due to EE, DR, and DG. While the studies were independent and used different modeling tools and interconnect-specific assumptions, all provided valuable results and insights. However, some caveats exist. Demand resources were evaluated in conjunction with other factors, and limitations on transmission additions between scenarios made understanding the role of demand resources difficult. One study, the western study, included analyses over both 10- and 20-year planning horizons; the 10-year analysis did not show near-term reductions in transmission, but the 20-year indicated fewer transmission additions, yielding a 36percent capital cost reduction. In the eastern study the reductions in demand largely led to reductions in local generation capacity and an increased opportunity for low-cost and renewable generation to export to other regions. The Texas study evaluated generation changes due to demand, and is in the process of examining demand resource impacts on transmission.

  17. National Transmission Grid Study: 2002

    Broader source: Energy.gov [DOE]

    National Transmission Grid Study: The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity...

  18. National Electric Transmission Congestion Studies

    Office of Energy Efficiency and Renewable Energy (EERE)

    Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. The American Reinvestment and Recovery Act of 2009 (Recovery Act) further directed the Secretary to include in the 2009 Congestion Study an analysis of significant potential sources of renewable energy that are constrained by lack of adequate transmission capacity. Based on this study, and comments concerning it from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor).

  19. Bulk Power Generation and Transmission

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Innovative Opportunities Blue lines: Transmission Grid Red lines: Lines that are congested or at outages - in RealTime Yellow and Red iconsdots: Power plant RealTime production ...

  20. Transmission Services Product Pricing Validation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and 09:00 PPT on the above effective date. On October 15, 2013, at 08:00 (PPT), Transmission Services will be updating the OASIS default product prices to reflect the 2014...

  1. Transmission Services Product Pricing Validation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and 12:00 PPT on the above effective date. On October 1, 2015, at 11:00 (PPT), Transmission Services will be updating the OASIS default product prices to reflect the 2016...

  2. Transmission Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action ...

  3. Electricity Generation, Transmission and Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Generation, Transmission and Energy Storage Systems Utilities and other electricity and transmission providers and regulators often require that equipment be proven safe and reliable before it is permitted on the grid. However, energy storage manufacturers and integrators are often unable to afford or provide the logistics necessary for this long-term testing and monitoring. The Energy Storage Test Pad (ESTP) in conjunction with the Energy Storage Analysis Laboratory (ESAL) provides trusted,

  4. Transmission SEAB Presentation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation (584.95 KB) More Documents & Publications Before House Natural Resources Committee QER - Comment of American Public Power Association 5 Before the House Committee on Natural Resources

  5. May 29 Tribal Renewable Energy Webinar to Highlight Regional...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    present the next Tribal Renewable Energy Series webinar, "Regional Transmission ... Helpful background information on the electricity grid can be found by viewing the free ...

  6. Three-dimensional infrared metamaterial with asymmetric transmission

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Kenanakis, George; Xomalis, Aggelos; Selimis, Alexandros; Vamvakaki, Maria; Farsari, Maria; Kafesaki, Maria; Soukoulis, Costas M.; Economou, Eleftherios N.

    2015-01-14

    A novel three-dimensional (3D) metallic metamaterial structure with asymmetric transmission for linear polarization is demonstrated in the infrared spectral region. The structure was fabricated by direct laser writing and selective electroless silver coating, a straightforward, novel technique producing mechanically and chemically stable 3D photonic structures. The structure unit cell is composed of a pair of conductively coupled magnetic resonators, and the asymmetric transmission response results from interplay of electric and magnetic responses; this equips the structure with almost total opaqueness along one propagation direction versus satisfying transparency along the opposite one. It also offers easily adjustable impedance, 90° one-way puremore » optical activity and backward propagation possibility, resulting thus in unique capabilities in polarization control and isolation applications. We show also that scaling down the structure can make it capable of exhibiting its asymmetric transmission and its polarization capabilities in the optical region.« less

  7. Three-dimensional infrared metamaterial with asymmetric transmission

    SciTech Connect (OSTI)

    Kenanakis, George; Xomalis, Aggelos; Selimis, Alexandros; Vamvakaki, Maria; Farsari, Maria; Kafesaki, Maria; Soukoulis, Costas M.; Economou, Eleftherios N.

    2015-01-14

    A novel three-dimensional (3D) metallic metamaterial structure with asymmetric transmission for linear polarization is demonstrated in the infrared spectral region. The structure was fabricated by direct laser writing and selective electroless silver coating, a straightforward, novel technique producing mechanically and chemically stable 3D photonic structures. The structure unit cell is composed of a pair of conductively coupled magnetic resonators, and the asymmetric transmission response results from interplay of electric and magnetic responses; this equips the structure with almost total opaqueness along one propagation direction versus satisfying transparency along the opposite one. It also offers easily adjustable impedance, 90° one-way pure optical activity and backward propagation possibility, resulting thus in unique capabilities in polarization control and isolation applications. We show also that scaling down the structure can make it capable of exhibiting its asymmetric transmission and its polarization capabilities in the optical region.

  8. Electric power transmission for a Hanford Nuclear Energy Center (HNEC)

    SciTech Connect (OSTI)

    Harty, H.; Dowis, W.J.

    1983-06-01

    The original study of transmission for a Hanford Nuclear Energy Center (HNEC), which was completed in September 1975, was updated in June 1978. The present 1983 revision takes cognizance of recent changes in the electric power situation of the PNW with respect to: (1) forecasts of load growth, (2) the feasibility of early use of 1100 kV transmission, and (3) the narrowing opportunities for siting nuclear plants in the region. The purpose of this update is to explore and describe additions to the existing transmission system that would be necessary to accommodate three levels of generation at HNEC. Comparisons with a PNW system having new thermal generating capacity distributed throughout the marketing region are not made as was done in earlier versions.

  9. Electric mergers: Transmission pricing, market size, and effects on competition

    SciTech Connect (OSTI)

    Legato, C.D.

    1996-06-01

    The prospect of deregulation has introducted a wave of mergers among electric utilities. Most of these mergers would fail an antitrust review because, by combining generation assets of interconnected utilities, they have substantially reduced potential competition in generation. In fact, one can predict that most mergers of utilities that operate within the same power pool or reliability region will be anticompetitive, even if they are not interconnected. Using an antitrust analysis, this article illustrates the potential anticompetitive effects of mergers between interconnected utilities. It concludes that the relevant geographic market will be an area in which a single, area-wide transmission price is charged. Moreover, it concludes that this area and, hence, the relevant market will likely span an area no larger than the Mid-American Interconnected Network or the Virginia/Carolina subregion of the Southeastern Reliability Council. Assuming markets of this size, the data on resulting concentration will show severe consequences for mergers of the sort that were announced in 1995 and 1996.

  10. 2006 National Electric Transmission Congestion Study | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, ...

  11. 2009 National Electric Transmission Congestion Study | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, ...

  12. 2006 National Electric Transmission Congestion Study Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

  13. NREL: Transmission Grid Integration Home Page

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Photo of transmission lines with a city in the background. NREL works with electric utilities, energy policymakers, and ... Researchers study transmission and grid integration issues ...

  14. Transmission Capital Limited | Open Energy Information

    Open Energy Info (EERE)

    Transmission Capital Limited Jump to: navigation, search Name: Transmission Capital Limited Place: London, United Kingdom Zip: EC2V 7HR Sector: Renewable Energy, Services Product:...

  15. Transmission Losses Product (pbl/products)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wind Smoothing and Intertie Service (Pilot) Firstgov Pricing for Transmission Losses Product Bonneville Power Administration (BPA) Power Services offers to sell transmission...

  16. Southwest Transmission Cooperative, Inc. Smart Grid Project ...

    Open Energy Info (EERE)

    syntax: * Display map References ARRA Smart Grid Investment Grants1 Southwest Transmission Cooperative Award2 Southwest Transmission Cooperative, Inc., located in Benson,...

  17. Annual Research Portfolio 2013 Transmission and Substations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ord Transmission & Substations New Components & Materials Research Roadmap 2 2013 Electric Power Research Institute, Inc. All rights reserved. Transmission & Substations Area ...

  18. Interconnection-Wide Transmission Planning Initiative - Meeting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Click on the links below to ...

  19. American Transmission Systems Inc | Open Energy Information

    Open Energy Info (EERE)

    American Transmission Systems Inc Jump to: navigation, search Name: American Transmission Systems Inc Place: Ohio Website: www.atcllc.com Twitter: @amertransco References: EIA...

  20. Electric Transmission Siting | Open Energy Information

    Open Energy Info (EERE)

    OtherOther: Electric Transmission SitingLegal Abstract Brief overview of the California Public Utilities Commission's process for siting of electric transmission lines. Published...

  1. Lone Star Transmission LLC | Open Energy Information

    Open Energy Info (EERE)

    Transmission LLC Jump to: navigation, search Name: Lone Star Transmission LLC Place: Juno Beach, Florida Zip: 33408 Product: Wholly owned subsidiary of FPL Energy, developing...

  2. Interconnection-Wide Transmission Planning Initiative: Topic...

    Energy Savers [EERE]

    the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas ...

  3. EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada.

  4. EIS-0090: Fort Peck-Havre Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of its proposed action to construct and operate a 230kV transmission line from Fort Peck to Havre, Montana, with three intermediate interconnecting substations.

  5. Slow Neutron Velocity Spectrometer Transmission Studies Of Pu

    DOE R&D Accomplishments [OSTI]

    Havens, W. W. Jr.; Melkonian, E.; Rainwater, L. J.; Levin, M.

    1951-05-28

    The slow neutron transmission of several samples of Pu has been investigated with the Columbia Neutron Velocity Spectrometer. Data are presented in two groups, those covering the energy region from 0 to 6 ev, and those covering the region above 6 ev. Below 6 ev the resolution was relatively good, and a detailed study of the cross section variation was made. Work above 6 ev consisted of merely locating levels and obtaining a rough idea of their strengths.

  6. Analysis of soft x-ray/VUV transmission characteristics of Si and Al filters

    SciTech Connect (OSTI)

    Joseph, Aby; Modi, Mohammed H.; Singh, Amol; Gupta, R. K.; Lodha, G. S.

    2013-02-05

    Ultrathin filters of Al (1500A) and Si (1200A) should exhibit more than 65% transmission above their Labsorption edges in the soft x-ray/vacuum ultra violet region(Si L-edge: 124 A and Al L-edge: 170 A). However, the measured transmission characteristics of these filters showed {approx}40% transmission. The transmission measurements of these filters were carried at the reflectivity beamline of Indus-1 synchrotron source out over a large wavelength range of 120-360A. In order to understand the measured transmission performance a detailed model fitting is performed using the Paratt formalism. It is found that the oxidation of the surface region of the filters is responsible for the reduced transmission performance. Effects of higher harmonics of the toroidal grating monochromator are also considered in the data analysis.

  7. EIS-0496: San Luis Transmission Project; Alameda, Merced, San Joaquin and Stanislaus Counties, California

    Broader source: Energy.gov [DOE]

    Western Area Power Administration and the San Luis & Delta-Mendota Water Authority (Authority) as joint federal and state lead agencies, are preparing an EIS/Environmental Impact Report that assesses the potential environmental impacts of the proposed San Luis Transmission Project. Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line between its Tracy and San Luis Substations and a new 70-kV transmission line between the San Luis and O'Neill Substations.

  8. Extraordinary optical transmission in nanopatterned ultrathin metal films without holes

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Peer, Akshit; Biswas, Rana

    2016-02-01

    In this study, we experimentally and theoretically demonstrate that a continuous gold film on a periodically textured substrate exhibits extraordinary optical transmission, even though no holes were etched in the film. Our film synthesis started by nanoimprinting a periodic array of nanocups with a period of ~750 nm on a polystyrene film over a glass substrate. A thin non-conformal gold film was sputter-deposited on the polystyrene by angle-directed deposition. The gold film was continuous with spatial thickness variation, the film being thinnest at the bottom of the nanocup. Measurements revealed an extraordinary transmission peak at a wavelength just smaller thanmore » the period, with an enhancement of ~2.5 compared to the classically expected value. Scattering matrix simulations model well the transmission and reflectance measurements when an ultrathin gold layer (~5 nm), smaller than the skin depth is retained at the bottom of the nanocups. Electric field intensities are enhanced by >100 within the nanocup, and ~40 in the ultrathin gold layer causing transmission through it. We show a wavelength red-shift of ~30 nm in the extraordinary transmission peak when the nanocups are coated with a thin film of a few nanometers, which can be utilized for biosensing. The continuous corrugated metal films are far simpler structures to observe extraordinary transmission, circumventing the difficult process of etching the metal film. Such continuous metal films with ultrathin regions are simple platforms for non-linear optics, plasmonics, and biological and chemical sensing.« less

  9. Application for presidential permit OE Docket No. PP-334 Baja Wind U.S Transmission LLC: Federal Register Notice Volume 73, No. 36- Feb. 22, 2008

    Broader source: Energy.gov [DOE]

    Federal Register Notice in Vol 73 No 36 of Application from Baja Wind U.S Transmission LLC to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border.

  10. Application for presidential permit OE Docket No. PP-334 Energia Sierra Juarex U.S Transmission LLC: Notice of Intent To Prepare an Environmental Impact Statement.

    Broader source: Energy.gov [DOE]

    Application from Energia Sierra Juarex U.S Transmission LLC to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border. Notice of intent to prepare an...

  11. Amended Application for Presidential Permit OE Docket No. PP-398 Minnesota Power- Great Northern Transmission Line: Federal Register Notice, Volume 79, No. 222- Nov. 18, 2014

    Broader source: Energy.gov [DOE]

    Minnesota Power, Great Northern Transmission Line has submitted an amended application for a Presidential Permit to construct, operate, maintain and connect an electric transmission line across the United States border with Canada.

  12. Interconnection Transmission Planning: Awards | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and Reinvestment Act organized by interconnection including the organization and amount of Recovery Act funding Interconnection Transmission Planning: Awards (39.73 KB) More Documents & Publications EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning - June 6, 2013 Report: Impacts of Demand-Side

  13. Wind Integration, Transmission, and Resource Assessment and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Characterization Projects | Department of Energy Integration, Transmission, and Resource Assessment and Characterization Projects Wind Integration, Transmission, and Resource Assessment and Characterization Projects This report covers the Wind and Water Power Technologies Office's Wind integration, transmission, and resource assessment and characterization projects from fiscal years 2006 to 2014. Wind Integration, Transmission, and Resource Assessment and Characterization Projects (3.35 MB)

  14. Regional Purchasing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regional Partnerships Regional Partnerships DOE's Regional Carbon Sequestration Partnerships Program DOE has created a network of seven Regional Carbon Sequestration Partnerships (RCSPs) to help develop the technology, infrastructure, and regulations to implement large-scale CO2 storage (also called carbon sequestration) in different regions and geologic formations within the Nation. Collectively, the seven RCSPs represent regions encompassing: 97 percent of coal-fired CO2 emissions; 97 percent

  15. EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York

    Broader source: Energy.gov [DOE]

    This EIS evaluated the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City.

  16. THERMALLY OPERATED VAPOR VALVE

    DOE Patents [OSTI]

    Dorward, J.G. Jr.

    1959-02-10

    A valve is presented for use in a calutron to supply and control the vapor to be ionized. The invention provides a means readily operable from the exterior of the vacuum tank of the apparatuss without mechanical transmission of forces for the quick and accurate control of the ionizing arc by a corresponding control of gas flow theretos thereby producing an effective way of carefully regulating the operation of the calutron. The invention consists essentially of a tube member extending into the charge bottle of a calutron devices having a poppet type valve closing the lower end of the tube. An electrical heating means is provided in the valve stem to thermally vary the length of the stem to regulate the valve opening to control the flow of material from the charge bottle.

  17. Operational Excellence

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operational Excellence Operational Excellence The Lab's mission is to develop and apply science and technology to ensure the safety, security, and reliability of the U.S. nuclear deterrent; reduce global threats; and solve other emerging national security and energy challenges. aeiral shot of los alamos, new mexico What Los Alamos gets done as a premier national security science laboratory depends on how we do it The Laboratory's operations and business systems ensure the safe, secure, and

  18. Operations Videos

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Research Analysts The U.S. Energy Information Administration (EIA) within the Department of Energy has forged a world-class information program that stresses quality, teamwork, and employee growth. In support of our program, we offer a variety of profes- sional positions, including the Operations Research Analyst, whose work is associated with the development and main- tenance of energy modeling systems. Responsibilities: Operations Research Analysts perform or participate in one or

  19. Laboratory Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Operations Laboratory Operations Latest announcements from the Lab on its operations. News Releases Science Briefs Photos Picture of the Week Publications Social Media Videos Fact Sheets The Laboratory began the Hazmat Challenge in 1996 to hone the skills of its own hazmat team members. 20th Hazmat Challenge tests skills of hazardous materials response teams Ten hazardous materials response teams from New Mexico, Missouri, Oklahoma and Nebraska test their skills in a series of graded,

  20. Cryogenic System for a High Temperature Superconducting Power Transmission Cable

    SciTech Connect (OSTI)

    Demko, J.A.; Gouge, M.J.; Hughey, R.L.; Lue, J.W.; Martin, R.; Sinha, U.; Stovall, J.P.

    1999-07-12

    High-temperature superconducting (HTS) cable systems for power transmission are under development that will use pressurized liquid nitrogen to provide cooling of the cable and termination hardware. Southwire Company and Oak Ridge National Laboratory have been operating a prototype HTS cable system that contains many of the typical components needed for a commercial power transmission application. It is being used to conduct research in the development of components and systems for eventual commercial deployment. The cryogenic system was built by Air Products and Chemicals, Allentown, Pennsylvania, and can circulate up to 0.35 kg/s of liquid nitrogen at temperatures as low as 67 K at pressures of 1 to 10 bars. Sufficient cooling is provided for testing a 5-m-long HTS transmission cable system that includes the terminations required for room temperature electrical connections. Testing of the 5-m HTS transmission cable has been conducted at the design ac conditions of 1250 A and 7.5 kV line to ground. This paper contains a description of the essential features of the HTS cable cryogenic system and performance results obtained during operation of the system. The salient features of the operation that are important in large commercial HTS cable applications will be discussed.

  1. High speed, long distance, data transmission multiplexing circuit

    DOE Patents [OSTI]

    Mariotti, Razvan

    1991-01-01

    A high speed serial data transmission multiplexing circuit, which is operable to accurately transmit data over long distances (up to 3 Km), and to multiplex, select and continuously display real time analog signals in a bandwidth from DC to 100 Khz. The circuit is made fault tolerant by use of a programmable flywheel algorithm, which enables the circuit to tolerate one transmission error before losing synchronization of the transmitted frames of data. A method of encoding and framing captured and transmitted data is used which has a low overhead and prevents some particular transmitted data patterns from locking an included detector/decoder circuit.

  2. Laboratory Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Hockaday is the associate director of the Experimental Physical Sciences Directorate and Cabbil is associate director for Nuclear and High Hazard Operations. - 12513 Norris ...

  3. operations center

    National Nuclear Security Administration (NNSA)

    servers and other critical Operations Center equipment

  4. Independent air supply system filtered to protect against biological and radiological agents (99.7%).
  5. <...

  6. SPEAR Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Interface 1113 N. Kurita J. Langton Vacuum TSP's 1120 J. Corbett A. Terebilo MATLAB Applications - Basics 1121 F. Rafael Booster Kicker Upgrade, Operation Manual 1121...

  7. Transmission Access Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Access Resources Transmission Access Resources Historically, the addition of new electric generation facilities has been accompanied by new transmission systems. For example, large nuclear and coal plants built in the 1960s and 1970s required interstate transmission infrastructure to deliver the electricity they produced. Likewise, the development of solar and wind generation in the United States will likely involve the development of new transmission. Although the cost of building

  8. NV PFA Regional Data

    SciTech Connect (OSTI)

    James Faulds

    2015-10-28

    This project focused on defining geothermal play fairways and development of a detailed geothermal potential map of a large transect across the Great Basin region (96,000 km2), with the primary objective of facilitating discovery of commercial-grade, blind geothermal fields (i.e. systems with no surface hot springs or fumaroles) and thereby accelerating geothermal development in this promising region. Data included in this submission consists of: structural settings (target areas, recency of faulting, slip and dilation potential, slip rates, quality), regional-scale strain rates, earthquake density and magnitude, gravity data, temperature at 3 km depth, permeability models, favorability models, degree of exploration and exploration opportunities, data from springs and wells, transmission lines and wilderness areas, and published maps and theses for the Nevada Play Fairway area.

  9. Fact #719: March 19, 2012 Nearly 14% of New Car Sales have Continuously Variable Transmissions

    Broader source: Energy.gov [DOE]

    Continuously variable transmissions (CVT) offer an infinite number of gear ratios that allow the engine to operate near peak efficiency throughout a wide range of vehicle speeds which improves fuel...

  10. Fact #851 December 15, 2014 The Average Number of Gears used in Transmissions Continues to Rise

    Broader source: Energy.gov [DOE]

    The number of gears in a transmission affects a vehicle's fuel economy and performance. The more gears a vehicle has, the more time the engine spends within an optimal operating range while the...

  11. EIS-0332: McNary-John Day Transmission Line Project, OR

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's decision to construct, operate, and maintain a 79-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon.

  12. Transmission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volunteers - Sign Up About Science Bowl Curriculum and Activities How to Build a Motor The Great Marble Drop How to Build a Turbine How to Build a Tower Classroom...

  13. Transmission

    Energy Savers [EERE]

    Our application was deemed complete by DPS in August of 2010, and the parties to the Article VII proceeding have been engaged in confidential settlement negotiations since November ...

  14. PP-420 Nogales Transmission, L.L.C.: Comment from Jean Public | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy : Comment from Jean Public PP-420 Nogales Transmission, L.L.C.: Comment from Jean Public Public comment on the Federal Register from Jean Public denying the transmission line of Nogales Interconnection Project to construct, operate and maintain electric transmission facilities at the U.S. - Mexico border. PP-420 Nogales Interconnection Project - Comment from Jean Public 05-23-16.pdf (128.05 KB) More Documents & Publications PP-420 Nogales Transmission L.L.C. - Comment from

  15. Low pressure electrospray ionization system and process for effective transmission of ions

    DOE Patents [OSTI]

    Tang, Keqi; Page, Jason S; Kelly, Ryan T; Smith, Richard D

    2012-05-08

    Systems and methods that provide up to complete transmission of ions between coupled stages with low effective ion losses. An "interfaceless" electrospray ionization system is further described that operates an electrospray at a reduced pressure such that standard electrospray sample solutions can be directly sprayed into an electrodynamic ion funnel which provides ion focusing and transmission of ions into a mass analyzer. Furthermore, chambers maintained at different pressures can allow for more optimal operating conditions for an electrospray emitter and an ion guide.

  16. UNITED STATES OF AMERICA DEPARTMENT OF ENERGY National Electric Transmission Congestion Study )

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DEPARTMENT OF ENERGY National Electric Transmission Congestion Study ) COMMENTS OF THE NEW YORK INDEPENDENT SYSTEM OPERATOR I. Introduction and Overarching Comments The New York Independent System Operator ("NYISO") 1 respectfully submits these comments in response to the Department of Energy's ("DOE," "Department") Public Comment Draft of the National Electric Transmission Congestion Study (the "Study"). 2 In these comments, the NYISO makes

  17. DOE Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Assistant Secretary for Electricity Delivery and Energy Reliability Kevin M. Kolevar today announced the Department's designation of two National Interest Electric Transmission Corridors (National Corridors) -- the Mid-Atlantic Area National Interest Electric Transmission Corridor, and the Southwest Area National Interest Electric Transmission Corridor. These corridors include areas in two of the Nation's most populous regions with growing electricity congestion problems. The Department based its designations on data and analysis showing that persistent transmission congestion exists in these two areas.

  18. Wave transmission over submerged breakwaters

    SciTech Connect (OSTI)

    Kobayashi, N.; Wurjanto, A. )

    1989-09-01

    Monochromatic wave reflection and transmission over a submerged impermeable breakwater is predicted numerically by slightly modifying the numerical model developed previously for predicting wave reflection and run-up on rough or smooth impermeable slopes. The slight modification is related to the landward boundary condition required for the transmitted wave propagating landward. In addition to the conservation equations of mass and momentum used to compute the flow field, an equation of energy is derived to estimate the rate of energy dissipation due to wave breaking. The computed reflection and transmission coefficients are shown to be in agreement with available small-scale test data. The numerical model also predicts the spatial variation of the energy dissipation, the mean water level difference, and the time-averaged volume flux per unit width, although available measurements are not sufficient for evaluating the capabilities and limitations of the numerical model for predicting these quantities.

  19. Operating Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

  20. Integrated Transmission and Distribution Control

    SciTech Connect (OSTI)

    Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

    2013-01-16

    Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: • Develop a simulation environment for integrating transmission and distribution control, • Construct reduced-order controllable models for smart grid assets at the distribution level, • Design and validate closed-loop control strategies for distributed smart grid assets, and • Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment

  21. Method for encryption and transmission of digital keying data

    DOE Patents [OSTI]

    Mniszewski, Susan M.; Springer, Edward A.; Brenner, David P.

    1988-01-01

    A method for the encryption, transmission, and subsequent decryption of digital keying data. The method utilizes the Data Encryption Standard and is implemented by means of a pair of apparatus, each of which is selectable to operate as either a master unit or remote unit. Each unit contains a set of key encryption keys which are indexed by a common indexing system. The master unit operates upon command from the remote unit to generate a data encryption key and encrypt the data encryption key using a preselected key encryption key. The encrypted data encryption key and an index designator are then downloaded to the remote unit, where the data encryption key is decrypted for subsequent use in the encryption and transmission data. Downloading of the encrypted data encryption key enables frequent change of keys without requiring manual entry or storage of keys at the remote unit.

  22. NREL: Transmission Grid Integration - Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Researchers are exploring the potential impacts of higher penetrations of solar and wind power on system operations. Our projects provide insights that enable improved and ...

  1. DOE Transmission System Integration Workshop

    Broader source: Energy.gov (indexed) [DOE]

    Near-Zero Emissions Long-Term Operations Renewable Integration Water Management Electric Vehicles Demand Response & Efficiency Renewable Energy Energy Storage Sensors & Control ...

  2. bpa.gov - Transmission Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand Customer Involvement Reports & Tools Expand Reports & Tools Operations &...

  3. Wind Integration, Transmission, and Resource Assessment and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Characterization Projects | Department of Energy Wind Integration, Transmission, and Resource Assessment and Characterization Projects Wind Integration, Transmission, and Resource Assessment and Characterization Projects From 2006 to 2014, DOE's Wind Program announced awards totaling more than $25 million for 41 projects focused on integration, transmission, and resource assessment and characterization. This report highlights each of these R&D efforts. Wind Integration, Transmission, and

  4. California - Establishing Transmission Project Review Streamlining...

    Open Energy Info (EERE)

    Regulatory Guidance - Supplemental Material: California - Establishing Transmission Project Review Streamlining DirectivesPermittingRegulatory GuidanceSupplemental Material...

  5. NREL: Measurements and Characterization - Transmission/Scanning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Electron Microscopy Transmission/Scanning Transmission Electron Microscopy In transmission electron microscopy (TEM), a thin sample, typically less than 200 nm, is bombarded by a highly focused beam of single-energy electrons. The beam has enough energy for the electrons to be transmitted through the sample, and the transmitted or scattered electron signal is greatly magnified by a series of electromagnetic lenses. The magnified signal may be observed by electron diffraction,

  6. Transmission Project Reporting FPA 216h

    Broader source: Energy.gov [DOE]

    A link to the searchable database of all transmission projects requiring Federal authorizations currently being tracked by DOE.

  7. Environmental Recommendations for Transmission Planning | Open...

    Open Energy Info (EERE)

    generation resources, energy policies, technology costs, impacts on transmission reliability, and emissions is anticipated to facilitate collaborative and comprehensive...

  8. Agenda: Electricity Transmission and Distribution- East

    Broader source: Energy.gov [DOE]

    Quadrennial Energy Review Public Meeting in Newark, NJ. September 8, 2014. Electricity Transmission and Distribution - Eastern Interconnection

  9. Annual Research Portfolio 2013 Transmission and Substations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ord Transmission & Substations New Components & Materials Research Roadmap 2 © 2013 Electric Power Research Institute, Inc. All rights reserved. Transmission & Substations Area Overhead Transmission Lines (P35) Underground Transmission Lines (P36) HVDC (P162) Substations (P37) Asset Related Research 3 © 2013 Electric Power Research Institute, Inc. All rights reserved. EPRI's Mission Advancing safe, reliable, affordable and environmentally responsible electricity for society through

  10. Transmission Infrastructure Investment Projects (2009) | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Transmission Infrastructure Investment Projects (2009) More Documents & Publications Financial Institution Partnership Program - Commercial Technology Renewable Energy Generation...

  11. Washington/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Avista, Pacificorp, Puget Sound Energy, Tacoma Public Utilities, Bonneville Power Administration, Columbia Grid, Northern Tier Transmission Group, and Seattle City...

  12. Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Public Utilities Commission of Ohio

    Broader source: Energy.gov [DOE]

    Comments of the PUCO on the application from Internation Transmission Company to construct, operate, and maintain electric transmision facilities at the U.S-Canada border.

  13. Energy Efficiency, Renewables, Advanced Transmission and Distribution

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technologies (2008) | Department of Energy Renewables, Advanced Transmission and Distribution Technologies (2008) Energy Efficiency, Renewables, Advanced Transmission and Distribution Technologies (2008) Energy Efficiency, Renewables, Advanced Transmission and Distribution Technologies (2008) (408.96 KB) More Documents & Publications Nuclear Power Facilities (2008) Financial Institution Partnership Program - Commercial Technology Renewable Energy Generation Projects Issued: October 7,

  14. Scenario Evaluation and Regionalization Analysis (SERA) Model

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evaluation and Regionalization Analysis (SERA) Model (National Renewable Energy Laboratory) Objectives Determine optimal regional infrastructure development patterns for hydrogen and other transportation fuels, given resource availability and technology cost estimates. Geospatially and temporally resolve the expansion of production, transmission, and distribution infrastructure components. Identify and characterize niche markets and synergies related to refueling station placement and early fuel

  15. Pulse shaping with transmission lines

    DOE Patents [OSTI]

    Wilcox, Russell B.

    1987-01-01

    A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

  16. Pulse shaping with transmission lines

    DOE Patents [OSTI]

    Wilcox, R.B.

    1985-08-15

    A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

  17. EIS-0478: Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billings, Williams, McKenzie, and Mountrail Counties, North Dakota

    Broader source: Energy.gov [DOE]

    USDA Rural Utilities Service prepared an EIS that evaluates the potential environmental impacts of constructing, operating, and maintaining a proposed transmission line and associated facilities in western North Dakota. DOE’s Western Area Power Administration, a cooperating agency, would modify its existing Williston Substation to allow a connection of the proposed new transmission line to Western’s transmission system.

  18. System for computer controlled shifting of an automatic transmission

    DOE Patents [OSTI]

    Patil, Prabhakar B.

    1989-01-01

    In an automotive vehicle having an automatic transmission that driveably connects a power source to the driving wheels, a method to control the application of hydraulic pressure to a clutch, whose engagement produces an upshift and whose disengagement produces a downshift, the speed of the power source, and the output torque of the transmission. The transmission output shaft torque and the power source speed are the controlled variables. The commanded power source torque and commanded hydraulic pressure supplied to the clutch are the control variables. A mathematical model is formulated that describes the kinematics and dynamics of the powertrain before, during and after a gear shift. The model represents the operating characteristics of each component and the structural arrangement of the components within the transmission being controlled. Next, a close loop feedback control is developed to determine the proper control law or compensation strategy to achieve an acceptably smooth gear ratio change, one in which the output torque disturbance is kept to a minimum and the duration of the shift is minimized. Then a computer algorithm simulating the shift dynamics employing the mathematical model is used to study the effects of changes in the values of the parameters established from a closed loop control of the clutch hydraulic and the power source torque on the shift quality. This computer simulation is used also to establish possible shift control strategies. The shift strategies determine from the prior step are reduced to an algorithm executed by a computer to control the operation of the power source and the transmission.

  19. Closed loop computer control for an automatic transmission

    DOE Patents [OSTI]

    Patil, Prabhakar B.

    1989-01-01

    In an automotive vehicle having an automatic transmission that driveably connects a power source to the driving wheels, a method to control the application of hydraulic pressure to a clutch, whose engagement produces an upshift and whose disengagement produces a downshift, the speed of the power source, and the output torque of the transmission. The transmission output shaft torque and the power source speed are the controlled variables. The commanded power source torque and commanded hydraulic pressure supplied to the clutch are the control variables. A mathematical model is formulated that describes the kinematics and dynamics of the powertrain before, during and after a gear shift. The model represents the operating characteristics of each component and the structural arrangement of the components within the transmission being controlled. Next, a close loop feedback control is developed to determine the proper control law or compensation strategy to achieve an acceptably smooth gear ratio change, one in which the output torque disturbance is kept to a minimum and the duration of the shift is minimized. Then a computer algorithm simulating the shift dynamics employing the mathematical model is used to study the effects of changes in the values of the parameters established from a closed loop control of the clutch hydraulic and the power source torque on the shift quality. This computer simulation is used also to establish possible shift control strategies. The shift strategies determined from the prior step are reduced to an algorithm executed by a computer to control the operation of the power source and the transmission.

  20. 2009 Electric Transmission Congestion Study | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2009 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the...

  1. Draft Chapter 4: Transmission Adequacy | Department of Energy

    Energy Savers [EERE]

    Draft Chapter 4: Transmission Adequacy Draft Chapter 4: Transmission Adequacy A robust interstate electric transmission network must be developed to enable our electricity future....

  2. RAPID/BulkTransmission/Air Quality | Open Energy Information

    Open Energy Info (EERE)

    BulkTransmissionAir Quality < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission...

  3. RAPID/BulkTransmission/Water Use | Open Energy Information

    Open Energy Info (EERE)

    RAPIDBulkTransmissionWater Use < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission...

  4. Comments of New England Electric Transmission Corporation on...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Comments of New England Electric Transmission ...

  5. RAPID/BulkTransmission/Land Access | Open Energy Information

    Open Energy Info (EERE)

    RAPIDBulkTransmissionLand Access < RAPID | BulkTransmission(Redirected from RAPIDBulkTransmissionLeasing) Jump to: navigation, search RAPID Regulatory and Permitting...

  6. RAPID/BulkTransmission/Land Use | Open Energy Information

    Open Energy Info (EERE)

    RAPIDBulkTransmissionLand Use < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission...

  7. Operating Strategies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operating Strategies and Design Recommendations for Mitigating Local Damage Effects in Offshore Turbine Blades Phillip W. Richards phillip@gatech.edu Graduate Research Assistant Daniel Guggenheim School of Aerospace Engineering Atlanta, Georgia, USA D. Todd Griffith dgriffi@sandia.gov Principal Member of the Technical Staff Sandia National Laboratories Albuquerque, New Mexico, USA Dewey H. Hodges dhodges@gatech.edu Professor Daniel Guggenheim School of Aerospace Engineering Atlanta, Georgia, USA

  8. Regional Planning Process in the West

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning Process in the West Robert H. Easton Tribal Webinar Series March 30, 2016 Transmission Planning in the Western Interconnection  Transmission Planning in the Western Interconnection has been, is, and will continue to be a hierarchy of local, regional, and interconnection-wide coordinated planning efforts  Pre-Order 890 - CAISO, NTTG, ColumbiaGrid, and WestConnect were already forums for collaboration and coordination - WECC PCC Project Coordination and Path Rating Process, Annual

  9. Integrating Wind into Transmission Planning: The Rocky Mountain Area Transmission Study (RMATS): Preprint

    SciTech Connect (OSTI)

    Hamilton, R.; Lehr, R.; Olsen, D.; Nielsen, J.; Acker, T.; Milligan, M.; Geller, H.

    2004-03-01

    Plans to expand the western grid are now underway. Bringing power from low-cost remote resources--including wind--to load centers could reduce costs for all consumers. But many paths appear to be already congested. Locational marginal price-based modeling is designed to identify the most cost-effective paths to be upgraded. The ranking of such paths is intended as the start of a process of political and regulatory approvals that are expected to result in the eventual construction of new and upgraded lines. This paper reviews the necessary data and analytical tasks to accurately represent wind in such modeling, and addresses some policy and regulatory issues that can help with wind integration into the grid. Providing wind fair access to the grid also (and more immediately) depends on tariff and regulatory changes. Expansion of the Rocky Mountain Area Transmission Study (RMATS) study scope to address operational issues supports the development of transmission solutions that enable wind to connect and deliver power in the next few years--much sooner than upgrades can be completed.

  10. Method and apparatus for executing an asynchronous clutch-to-clutch shift in a hybrid transmission

    DOE Patents [OSTI]

    Demirovic, Besim; Gupta, Pinaki; Kaminsky, Lawrence A.; Naqvi, Ali K.; Heap, Anthony H.; Sah, Jy-Jen F.

    2014-08-12

    A hybrid transmission includes first and second electric machines. A method for operating the hybrid transmission in response to a command to execute a shift from an initial continuously variable mode to a target continuously variable mode includes increasing torque of an oncoming clutch associated with operating in the target continuously variable mode and correspondingly decreasing a torque of an off-going clutch associated with operating in the initial continuously variable mode. Upon deactivation of the off-going clutch, torque outputs of the first and second electric machines and the torque of the oncoming clutch are controlled to synchronize the oncoming clutch. Upon synchronization of the oncoming clutch, the torque for the oncoming clutch is increased and the transmission is operated in the target continuously variable mode.

  11. Superconducting transmission line particle detector

    DOE Patents [OSTI]

    Gray, K.E.

    1988-07-28

    A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

  12. Shock transmissibility of threaded joints

    SciTech Connect (OSTI)

    Hansen, N.R.; Bateman, V.I.; Brown, F.A.

    1996-12-31

    Sandia National Laboratories (SNL) designs mechanical systems with threaded joints that must survive high shock environments. These mechanical systems include penetrators that must survive soil and rock penetration; drilling pipe strings that must survive rock-cutting, shock environments; and laydown weapons that must survive delivery impact shock. This paper summarizes an analytical study and an experimental evaluation of compressive, one-dimensional, shock transmission through a threaded joint in a split Hopkinson bar configuration. Thread geometries were scaled to simulate large diameter threaded joints with loadings parallel to the axis of the threads. Both strain and acceleration were evaluated with experimental measurements and analysis. Analytical results confirm the experimental conclusions that in this split Hopkinson bar configuration, the change in the one-dimensional shock wave by the threaded joint is localized to a length equal to a few diameters` length beyond the threaded joint.

  13. Superconducting transmission line particle detector

    DOE Patents [OSTI]

    Gray, Kenneth E.

    1989-01-01

    A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

  14. Magnetically insulated transmission line oscillator

    DOE Patents [OSTI]

    Bacon, Larry D.; Ballard, William P.; Clark, M. Collins; Marder, Barry M.

    1988-01-01

    A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

  15. Magnetically insulated transmission line oscillator

    DOE Patents [OSTI]

    Bacon, L.D.; Ballard, W.P.; Clark, M.C.; Marder, B.M.

    1987-05-19

    A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields are produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap. 11 figs.

  16. Computer controlled synchronous shifting of an automatic transmission

    DOE Patents [OSTI]

    Davis, Roy I.; Patil, Prabhakar B.

    1989-01-01

    A multiple forward speed automatic transmission produces its lowest forward speed ratio when a hydraulic clutch and hydraulic brake are disengaged and a one-way clutch connects a ring gear to the transmission casing. Second forward speed ratio results when the hydraulic clutch is engaged to connect the ring gear to the planetary carrier of a second gear set. Reverse drive and regenerative operation result when an hydraulic brake fixes the planetary and the direction of power flow is reversed. Various sensors produce signals representing the torque at the output of the transmission or drive wheels, the speed of the power source, and the hydraulic pressure applied to a clutch and brake. A control algorithm produces input data representing a commanded upshift, a commanded downshift, a commanded transmission output torque, and commanded power source speed. A microprocessor processes the inputs and produces a response to them in accordance with the execution of a control algorithm. Output or response signals cause selective engagement and disengagement of the clutch and brake at a rate that satisfies the requirements for a short gear ratio change and smooth torque transfer between the friction elements.

  17. Computer controllable synchronous shifting of an automatic transmission

    DOE Patents [OSTI]

    Davis, R.I.; Patil, P.B.

    1989-08-08

    A multiple forward speed automatic transmission produces its lowest forward speed ratio when a hydraulic clutch and hydraulic brake are disengaged and a one-way clutch connects a ring gear to the transmission casing. Second forward speed ratio results when the hydraulic clutch is engaged to connect the ring gear to the planetary carrier of a second gear set. Reverse drive and regenerative operation result when an hydraulic brake fixes the planetary and the direction of power flow is reversed. Various sensors produce signals representing the torque at the output of the transmission or drive wheels, the speed of the power source, and the hydraulic pressure applied to a clutch and brake. A control algorithm produces input data representing a commanded upshift, a commanded downshift, a commanded transmission output torque, and commanded power source speed. A microprocessor processes the inputs and produces a response to them in accordance with the execution of a control algorithm. Output or response signals cause selective engagement and disengagement of the clutch and brake at a rate that satisfies the requirements for a short gear ratio change and smooth torque transfer between the friction elements. 6 figs.

  18. Integrating Wind and Solar Energy in the U.S. Bulk Power System: Lessons from Regional Integration Studies

    SciTech Connect (OSTI)

    Bird, L.; Lew, D.

    2012-09-01

    Two recent studies sponsored by the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) have examined the impacts of integrating high penetrations of wind and solar energy on the Eastern and Western electric grids. The Eastern Wind Integration and Transmission Study (EWITS), initiated in 2007, examined the impact on power system operations of reaching 20% to 30% wind energy penetration in the Eastern Interconnection. The Western Wind and Solar Integration Study (WWSIS) examined the operational implications of adding up to 35% wind and solar energy penetration to the Western Interconnect. Both studies examined the costs of integrating variable renewable energy generation into the grid and transmission and operational changes that might be necessary to address higher penetrations of wind or solar generation. This paper identifies key insights from these regional studies for integrating high penetrations of renewables in the U.S. electric grid. The studies share a number of key findings, although in some instances the results vary due to differences in grid operations and markets, the geographic location of the renewables, and the need for transmission.

  19. Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (~ii~,Richland Operations Office ~Z4TESO~Richland, Washington 99352 SEP 2 2009 CERTIFIED MAIL Ms. Sarah Washburn Heart of America Northwest 1314 N.E. 5 6 th Street Suite 100 Seattle, Washington 98105 Dear Ms. Washburn: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0067) You requested, pursuant to the Freedom of Information Act (FOJA), the following documents relating to: 1 . "The authorization, decision to use, and actual use of any and all pesticides and herbicides anywhere within the

  20. Dynamic Power Flow Controller: Compact Dynamic Phase Angle Regulators for Transmission Power Routing

    SciTech Connect (OSTI)

    2012-01-03

    GENI Project: Varentec is developing compact, low-cost transmission power controllers with fractional power rating for controlling power flow on transmission networks. The technology will enhance grid operations through improved use of current assets and by dramatically reducing the number of transmission lines that have to be built to meet increasing contributions of renewable energy sources like wind and solar. The proposed transmission controllers would allow for the dynamic control of voltage and power flow, improving the grid’s ability to dispatch power in real time to the places where it is most needed. The controllers would work as fail-safe devices whereby the grid would be restored to its present operating state in the event of a controller malfunction instead of failing outright. The ability to affordably and dynamically control power flow with adequate fail-safe switchgear could open up new competitive energy markets which are not possible under the current regulatory structure and technology base.

  1. Application for presidential permit OE Docket No. PP-334 Energia Sierra Juarex U.S Transmission LLC- Notice of Intent To Prepare an Environmental Impact Statement: Federal Register Volume 74, No. 36- Feb. 25, 2009

    Broader source: Energy.gov [DOE]

    Application from Energia Sierra Juarex U.S Transmission LLC to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border. Federal Register Notice of intent to...

  2. Regional Partnerships

    Broader source: Energy.gov [DOE]

    DOE has created a network of seven Regional Carbon Sequestration Partnerships (RCSPs) to help develop the technology, infrastructure, and regulations to implement large-scale CO2 storage (also...

  3. Region Overview

    Energy Savers [EERE]

    ... Power Plants: 1,858 (30% total U.S.) Coal-fired: 167 (30% total U.S.) Petroleum-fired: ... leading cause of natural gas processing plant disruptions in the East Coast Region from ...

  4. Region Overview

    Energy Savers [EERE]

    Power Plants: 666 (11% total U.S.) Coal-fired: 46 (8% total U.S.) Petroleum-fired: 39 ... leading cause of natural gas processing plant disruptions in the Gulf Coast Region from ...

  5. Region Overview

    Energy Savers [EERE]

    Power Plants: 429 (8% total U.S.) Coal-fired: 46 (8% total U.S.) Petroleum-fired: 26 ... leading cause of natural gas processing plant disruptions in the Rocky Mountain Region ...

  6. Region Overview

    Energy Savers [EERE]

    ... Power Plants: 2,006 (30% total U.S.) Coal-fired: 274 (49% total U.S.) Petroleum-fired: ... leading cause of natural gas processing plant disruptions in the Midwest region from ...

  7. Region Overview

    Energy Savers [EERE]

    Power Plants: 1,407 (24% total U.S.) Coal-fired: 24 (4% total U.S.) Petroleum-fired: 131 ... leading cause of natural gas processing plant disruptions in the West Coast Region's ...

  8. Solving the Accelerator-Condenser Coupling Problem in a Nanosecond Dynamic Transmission Electron Microscope

    SciTech Connect (OSTI)

    Reed, B W; LaGrange, T; Shuttlesworth, R M; Gibson, D J; Campbell, G H; Browning, N D

    2009-12-29

    We describe a modification to a transmission electron microscope (TEM) that allows it to briefly (using a pulsed-laser-driven photocathode) operate at currents in excess of 10 mA while keeping the effects of condenser lens aberrations to a minimum. This modification allows real-space imaging of material microstructure with a resolution of order 10 nm over regions several {micro}m across with an exposure time of 15 ns. This is more than 6 orders of magnitude faster than typical video-rate TEM imaging. The key is the addition of a weak magnetic lens to couple the large-diameter high-current beam exiting the accelerator into the acceptance aperture of a conventional TEM condenser lens system. We show that the performance of the system is essentially consistent with models derived from ray tracing and finite element simulations. The instrument can also be operated as a conventional TEM by using the electron gun in a thermionic mode. The modification enables very high electron current densities in {micro}m-sized areas and could also be used in a non-pulsed system for high-throughput imaging and analytical TEM.

  9. PP-420 Nogales Transmission, L.L.C. - Comment from Fresh Produce

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Association of the Americas | Department of Energy - Comment from Fresh Produce Association of the Americas PP-420 Nogales Transmission, L.L.C. - Comment from Fresh Produce Association of the Americas Public comment from Fresh Produce Association of the Americas on the Nogales Interconnection Project to construct, operate and maintain electric transmission facilities at the U.S. - Mexico Border. Nogales Interconnection Project Comments-FPAA 6-20-16.pdf (175.62 KB) More Documents &

  10. Optimizing your options: Extracting the full economic value of transmission when planning under uncertainty

    SciTech Connect (OSTI)

    Munoz, Francisco D.; Watson, Jean -Paul; Hobbs, Benjamin F.

    2015-06-04

    In this study, the anticipated magnitude of needed investments in new transmission infrastructure in the U.S. requires that these be allocated in a way that maximizes the likelihood of achieving society's goals for power system operation. The use of state-of-the-art optimization tools can identify cost-effective investment alternatives, extract more benefits out of transmission expansion portfolios, and account for the huge economic, technology, and policy uncertainties that the power sector faces over the next several decades.

  11. Low pressure electrospray ionization system and process for effective transmission of ions

    DOE Patents [OSTI]

    Tang, Keqi; Page, Jason S.; Kelly, Ryan T.; Smith, Richard D.

    2010-03-02

    A system and method are disclosed that provide up to complete transmission of ions between coupled stages with low effective ion losses. A novel "interfaceless" electrospray ionization system is further described that operates the electrospray at a reduced pressure such that standard electrospray sample solutions can be directly sprayed into an electrodynamic ion funnel which provides ion focusing and transmission of ions into a mass analyzer.

  12. Detonator comprising a nonlinear transmission line

    DOE Patents [OSTI]

    Elizondo-Decanini, Juan M

    2014-12-30

    Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

  13. Transmission Reliability Program 2015 Reliability & Markets Peer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program 2015 Reliability & Markets Peer Review Materials Available Transmission Reliability Program 2015 Reliability & Markets Peer Review Materials Available September 16, 2015 -...

  14. ETrans Federal Permitting Transmission Tracking System | Open...

    Open Energy Info (EERE)

    More recently, the Rapid Response Team for Transmission (RRTT) was created, which extends activity outside of federal lands. This website hosts a tracking system and search feature...

  15. Generation and Transmission Maximization Model | Open Energy...

    Open Energy Info (EERE)

    its limited energy and transmission resources, but also firm contracts, independent power producer (IPP) agreements, and bulk power transaction opportunities on the spot...

  16. Richard Shaheen named Senior VP of Transmission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    transmission lines and initiated upgrades to Celilo Substation and the Pacific Direct Current Intertie. "Richard is an excellent leader, and his 25-plus years of experience at a...

  17. Coordination of Federal Authorizations for Electric Transmission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Coordination of Federal Authorizations for Electric Transmission Facilities: Federal Register Notice Volume 73, No. 183 - Sep. 19, 2008 Coordination of Federal Authorizations for...

  18. NREL: Transmission Grid Integration - Issues Affecting Renewable...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Variability of renewable energy sources Integration costs Frequency response Emissions System balancing Energy storage Transmission Solar and wind forecasting High-penetration ...

  19. Electricity Transmission, A Primer | Open Energy Information

    Open Energy Info (EERE)

    LibraryAdd to library Report: Electricity Transmission, A Primer Authors Matthew H. Brown, National Conference of State Legislatures, Richard P. Sedano and The Regulatory...

  20. Ponderomotive phase plate for transmission electron microscopes...

    Office of Scientific and Technical Information (OSTI)

    A ponderomotive phase plate system and method for controllably producing highly tunable phase contrast transfer functions in a transmission electron microscope (TEM) for high ...

  1. Template:Nepa Transmission | Open Energy Information

    Open Energy Info (EERE)

    General NEPA Document Information TransmissionType - Energy Sector (e.g. Geothermal, Solar, Wind) (page: Category:ElectricityGeneratingTechnologies) EnvironmentalAnalysisTyp...

  2. Proponent's Environmental Assessment (PEA) Checklist for Transmission...

    Open Energy Info (EERE)

    Proponent's Environmental Assessment (PEA) Checklist for Transmission Line and Substation Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Permitting...

  3. Registration Contact List: Electricity Transmission System Workshop

    Broader source: Energy.gov (indexed) [DOE]

    ... Gordon H. Matthews General Engineer Bonneville Power Administration PO Box 3621 Portland OR 97208 United States 503-230-3275 Registration Contact List: Electricity Transmission ...

  4. 1993 Wholesale Power and Transmission Rate Schedules.

    SciTech Connect (OSTI)

    US Bonneville Power Administration

    1993-10-01

    Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

  5. Especial Gear Transmissions EGT | Open Energy Information

    Open Energy Info (EERE)

    EGT Jump to: navigation, search Name: Especial Gear Transmissions (EGT) Place: Spain Sector: Wind energy Product: Designs, manufactures and repairs industrial wind gear reducers...

  6. Transmission Reassignment Reporting Requirement - April 2, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    capacity reassignments, including but not limited to pricing information, on BPA's Open Access Same-Time Information System (OASIS). Customers reassigning transmission...

  7. Nevada Transmission Siting Information | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Nevada Transmission Siting InformationPermittingRegulatory GuidanceGuide...

  8. NREL: Transmission Grid Integration - Working With Us

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NREL's extensive research facilities-including the new Energy Systems Integration ... Printable Version Transmission Grid Integration Home Issues Projects Research Staff Working ...

  9. Transmission Services Commercial Systems Support and Development

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Commercial Systems Support and Development Customer Conference Call Agenda This customer conference call will provide updates concerning BPA Transmission Services' commercial...

  10. Northern Pass Transmission Line Project Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September ...

  11. Category:NEPA Transmission | Open Energy Information

    Open Energy Info (EERE)

    Pages in category "NEPA Transmission" This category contains only the following page. T TransWest Retrieved from "http:en.openei.orgwindex.php?titleCategory:NEPATransmiss...

  12. State Generation & Transmission Siting Directory | Open Energy...

    Open Energy Info (EERE)

    Directory Jump to: navigation, search OpenEI Reference LibraryAdd to library General: State Generation & Transmission Siting Directory Abstract A guide of generation and...

  13. State Strategies for Accelerating Transmission Development for...

    Open Energy Info (EERE)

    Strategies for Accelerating Transmission Development for Renewable Energy Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: State Strategies for...

  14. Renewable Energy Transmission Roadmap | Open Energy Information

    Open Energy Info (EERE)

    Roadmap Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Renewable Energy Transmission Roadmap Abstract Renewable energy is becoming an...

  15. Southline Transmission Line | Open Energy Information

    Open Energy Info (EERE)

    Analysis Type EIS Applicant Southline Transmission, LLC, a subsidiary of Hunt Power L.P. Consultant SWCA Environmental Consultants Geothermal Area Project Location Project...

  16. EEI/DOE Transmission Capacity Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Others believe that serious transmission problems exist but ... Chapter 4 discusses the planning materials 4 Fig. 1. Map of ... ranging from 1 (least severe) to 6 (emergency conditions). ...

  17. Articles about Grid Integration and Transmission | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    about grid integration and transmission featured by the U.S. Department of Energy (DOE) Wind Program. September 16, 2015 Argonne National Laboratory Develops New Model to Quantify...

  18. DOE Affirms National Interest Electric Transmission Corridor...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    data analysis conducted in its 2006 National Interest Electric Transmission study, ... DOE also highlighted that its approach to defining the geographic boundaries of the ...

  19. Infrastructure Needs: Natural Gas/Electricity Transmission,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... This will require significant northsouth transmission investment that falls outside of our ... We are a partner with the New England States Committee on Electricity (NESCOE) ...

  20. Memorandum of Understanding Regarding Transmission Siting on...

    Open Energy Info (EERE)

    Transmission Siting on Federal Land (2006)Legal Author Federal Agencies Organizations United States Department of Energy, United States Department of Defense, United States...

  1. Scientific Achievement Analytical Transmission Electron Microscopy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Analytical Transmission Electron Microscopy (TEM) method was developed to determine thickness and wrinkles in electron beam sensitive 2-dimensional (2D) MFI nanosheets....

  2. Transmission/Resource Library | Open Energy Information

    Open Energy Info (EERE)

    electric transmission systems, including in-depth discussion direct current, below-ground, and high-temperature superconductor lines. Includes sections on design features as...

  3. Interconnection-Wide Transmission Planning Initiative: Topic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Western Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western ...

  4. Interconnection-Wide Transmission Planning Initiative: Topic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern ...

  5. Interconnection-Wide Transmission Planning Initiative: Topic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the ...

  6. Reminder: Transmission Services Product Pricing Validation -...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Teams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: Reminder: Transmission Services Product Pricing Validation This...

  7. Transmission Services Product Pricing Validation - September...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Teams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Notice: Transmission Services Product Pricing Validation On October 1,...

  8. Energy Department, Arizona Utilities Announce Transmission Infrastruct...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    County, Arizona, and runs southeast to the ED5 Substation in Pinal County, Arizona. ... Area Power Administration Transmission Substation Federal Agencies to Assist with Clean ...

  9. Transmission Services Commercial Systems Support and Development

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Call Agenda This customer conference call will provide updates concerning BPA Transmission Services' commercial systems support and development efforts. It will also provide...

  10. RAPID/BulkTransmission | Open Energy Information

    Open Energy Info (EERE)

    regulatory processes and requirements by searching our regulatory flowchart library. Learn more about bulk transmission. BulkTransCoverage.png Regulations and permitting...

  11. RAPID/Geothermal/Transmission Siting & Interconnection | Open...

    Open Energy Info (EERE)

    to the public for compensation. See AS 42.05.990(5) for additional information. NA Geothermal Transmission Siting & Interconnection in California California Energy...

  12. Wyoming/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Lower Valley Energy, High West Energy, Western Area Power Administration, Bonneville Power Administration, Tri-State Generation and Transmission Association, Inc., and Rocky...

  13. California/Transmission | Open Energy Information

    Open Energy Info (EERE)

    San Diego Gas & Electric, Sacramento Municipal Utility District, PacifiCorp, Bonneville Power Administration, Transmission Agency of Northern California, and Western Area Power...

  14. Nevada/Transmission | Open Energy Information

    Open Energy Info (EERE)

    own transmission facilities in the State of Nevada: NV Energy, Bonneville Power Administration, and Valley Electric Association, Colorado River Commission, Los...

  15. Oregon/Transmission | Open Energy Information

    Open Energy Info (EERE)

    Electric Cooperative, Columbia Grid, Northern Tier Transmission Group, and Bonneville Power Administration. Oregon Energy Policy The Oregon Department of Energy's Governor's...

  16. Superfund Record of Decision (EPA Region 8): Silver Bow Creek/Butte Area NPL site, Warm Springs Ponds Operable Unit, Upper Clark Fork River Basin, MT. (First remedial action), September 1990

    SciTech Connect (OSTI)

    Not Available

    1990-09-28

    The Silver Bow Creek site is a mining and processing area in the Upper Clark Fork River Basin, Deer Lodge County, Southwestern Montana. The Record of Decision (ROD) documents the selected interim remedial action for one of eleven operable units for the site, the Warm Springs Ponds operable unit, which covers approximately 2,500 acres just above the beginning of the Clark Fork River. Contamination at the site is the result of over 100 years of mining and process operations in the area. Mining, milling, and smelting waste were dumped directly into Silver Bow Creek and transported downstream to the Clark Fork River with final deposition downstream as far as 130 miles. Principal threats from the site include the possibility of pond berm failure due to flood and earthquake damage that could release millions of cubic yards of tailings and sediment to the river. Furthermore, the creeks are contaminated with dissolved metals, and exposed soil and tailings are contaminated with elevated levels of several metals. The primary contaminants of concern affecting the soil, sediment, ground water, and surface water are metals including arsenic, cadmium, copper, lead, and zinc.

  17. USDA Regional Conservation Partnership Program

    Broader source: Energy.gov [DOE]

    The U.S. Department of Agriculture is accepting applications for the Regional Conservation Partnership Program to identify and address natural resource objectives in balance with operational goals in order to benefit soil, water, wildlife, and related natural resources locally, regionally, and nationally.

  18. Comments by the American Electric Power System on Proposed Coordination of Federal Authorizations for Electric Transmission Facilities

    Broader source: Energy.gov [DOE]

     Proposed Coordination of Federal Authorizations for Electric Transmission Facilities – Interim Final Rule and Proposed Rule (DOE, 10 CR Part 900): The utility operating companies of the American...

  19. Calutron Operations | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Calutron Operations

  20. Electric System Decision Making in Other Regions: A Preliminary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on Regional Electric Power Cooperation The nation's electricity system is regional in nature, because of the operation of the interconnected grids and the markets defined by them. ...

  1. Ecological benefits of dc power transmission

    SciTech Connect (OSTI)

    Kutuzova, N. B.

    2011-05-15

    The environmental effects of dc overhead transmission lines are examined. The major effects of ac and dc transmission lines are compared. Dc lines have advantages compared to ac lines in terms of electrical safety for people under the lines, biological effects, corona losses, and clearance width.

  2. The Reliability Investigation on ACSR Splice Connector Systems Used in Overhead Power transmission Lines

    SciTech Connect (OSTI)

    Wang, Jy-An John; Jiang, Hao; Ren, Fei

    2012-01-01

    Due to material discontinuity and inherited forming mechanism from a crimped-type splice connector, the associated conductor-connector system is highly sensitive to system components aging, especially during high-temperature operations. Furthermore, due to the increase in power demand and limited investment in new infrastructure, existing overhead power transmission lines often need to operate at temperatures higher than the original designed values. This has led to the accelerated aging and degradation of conductor-connector systems. The implications of connector aging are two-fold: (1) significant increase in resistivity of the splice connector and (2) significant reduction in the connector clamping strength. Therefore, splice connectors are one of the weakest links in the electric power transmission infrastructure. In this paper we will discuss the reliability of splice connector systems, including both single stage and two stage splice connectors, used in ACSR conductor of transmission lines under high temperature operations.

  3. Conductive Channel for Energy Transmission

    SciTech Connect (OSTI)

    Apollonov, Victor V.

    2011-11-10

    For many years the attempts to create conductive channels of big length were taken in order to study the upper atmosphere and to settle special tasks, related to energy transmission. There upon the program of creation of 'Impulsar' represents a great interest, as this program in a combination with high-voltage high repetition rate electrical source can be useful to solve the above mentioned problems (N. Tesla ideas for the days of high power lasers). The principle of conductive channel production can be shortly described as follows. The 'Impulsar' - laser jet engine vehicle - propulsion take place under the influence of powerful high repetition rate pulse-periodic laser radiation. In the experiments the CO{sub 2}-laser and solid state Nd:YAG laser systems had been used. Active impulse appears thanks to air breakdown (<30 km) or to the breakdown of ablated material on the board (>30 km), placed in the vicinity of the focusing mirror-acceptor of the breakdown waves. With each pulse of powerful laser the device rises up, leaving a bright and dense trace of products with high degree of ionization and metallization by conductive nano-particles due to ablation. Conductive dust plasma properties investigation in our experiments was produced by two very effective approaches: high power laser controlled ablation and by explosion of wire. Experimental and theoretical results of conductive canal modeling will be presented. The estimations show that with already experimentally demonstrated figures of specific thrust impulse the lower layers of the Ionosphere can be reached in several ten seconds that is enough to keep the high level of channel conductivity and stability with the help of high repetition rate high voltage generator. Some possible applications for new technology are highlighted.

  4. Oak Ridge Operations.

    Office of Legacy Management (LM)

    4s - 22 Department of Energy Oak Ridge Operations. S~I9J>liB~~ ~P.O. Box 2001 Oak Ridge. Tennessee 37831-8723 October 21, 1994 Mr. Charles A. Duritsa Regional Director Pennsylvania Department of Environmental Resources 400 Waterfront Drive Pittsburgh, Pennsylvania 15222-4745 Dear Mr. Duritsa: FUSRAP PENNSYLVANIA SITES - LETTER OF APPRECIATION I would like to express my appreciation for the assistance Jim Yusko, Hark Russell, Dennis Angelo, Steve Hepler, and Roy Woods provided to the

  5. Concurrent in situ ion irradiation transmission electron microscope

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Hattar, K.; Bufford, D. C.; Buller, D. L.

    2014-08-29

    An in situ ion irradiation transmission electron microscope has been developed and is operational at Sandia National Laboratories. This facility permits high spatial resolution, real time observation of electron transparent samples under ion irradiation, implantation, mechanical loading, corrosive environments, and combinations thereof. This includes the simultaneous implantation of low-energy gas ions (0.8–30 keV) during high-energy heavy ion irradiation (0.8–48 MeV). In addition, initial results in polycrystalline gold foils are provided to demonstrate the range of capabilities.

  6. Control system and method for a power delivery system having a continuously variable ratio transmission

    DOE Patents [OSTI]

    Frank, A.A.

    1984-07-10

    A control system and method for a power delivery system, such as in an automotive vehicle, having an engine coupled to a continuously variable ratio transmission (CVT). Totally independent control of engine and transmission enable the engine to precisely follow a desired operating characteristic, such as the ideal operating line for minimum fuel consumption. CVT ratio is controlled as a function of commanded power or torque and measured load, while engine fuel requirements (e.g., throttle position) are strictly a function of measured engine speed. Fuel requirements are therefore precisely adjusted in accordance with the ideal characteristic for any load placed on the engine. 4 figs.

  7. Control system and method for a power delivery system having a continuously variable ratio transmission

    DOE Patents [OSTI]

    Frank, Andrew A.

    1984-01-01

    A control system and method for a power delivery system, such as in an automotive vehicle, having an engine coupled to a continuously variable ratio transmission (CVT). Totally independent control of engine and transmission enable the engine to precisely follow a desired operating characteristic, such as the ideal operating line for minimum fuel consumption. CVT ratio is controlled as a function of commanded power or torque and measured load, while engine fuel requirements (e.g., throttle position) are strictly a function of measured engine speed. Fuel requirements are therefore precisely adjusted in accordance with the ideal characteristic for any load placed on the engine.

  8. Simultaneous orientation and thickness mapping in transmission electron microscopy

    SciTech Connect (OSTI)

    Tyutyunnikov, Dmitry; Özdöl, V. Burak; Koch, Christoph T.

    2014-12-04

    In this paper we introduce an approach for simultaneous thickness and orientation mapping of crystalline samples by means of transmission electron microscopy. We show that local thickness and orientation values can be extracted from experimental dark-field (DF) image data acquired at different specimen tilts. The method has been implemented to automatically acquire the necessary data and then map thickness and crystal orientation for a given region of interest. We have applied this technique to a specimen prepared from a commercial semiconductor device, containing multiple 22 nm technology transistor structures. The performance and limitations of our method are discussed and compared to those of other techniques available.

  9. EIS-0486: Plains & Eastern Clean Line Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA).

  10. Regional Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regional Information There is plenty to do and see in the cities of Golden and Denver, Colorado. Here you'll find links to general information about these areas, plus hospitals, local universities and colleges, entertainment, sports, amusement parks, and more. Golden City of Golden Golden's 2-Hour Vacation Denver www.denver.com www.denver.org Denver Public Library Colorado State of Colorado Colorado tourism Transportation (Bus and Light Rail) RTD Hospitals Largest Hospitals in Metro Denver

  11. Doubly Fed Induction Generator in an Offshore Wind Power Plant Operated at Rated V/Hz: Preprint

    SciTech Connect (OSTI)

    Muljadi, E.; Singh, M.; Gevorgian, V.

    2012-06-01

    This paper introduces the concept of constant Volt/Hz operation of offshore wind power plants. The deployment of offshore WPPs requires power transmission from the plant to the load center inland. Since this power transmission requires submarine cables, there is a need to use High-Voltage Direct Current transmission, which is economical for transmission distances longer than 50 kilometers. In the concept presented here, the onshore substation is operated at 60 Hz synced with the grid, and the offshore substation is operated at variable frequency and voltage, thus allowing the WPP to be operated at constant Volt/Hz.

  12. Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Interconnection Project | Department of Energy Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric

  13. Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS);

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hawaiian Islands Transmission Interconnection Project | Department of Energy Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and

  14. Wallula Power Project and Wallula - McNary Transmission Line Project Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-08-16

    Wallula Generation, LLC proposes to construct a 1,300-megawatt (MW) natural gas-fired combined-cycle combustion gas turbine facility (the Wallula Power Project). The project would be located in the northwestern portion of Walla Walla County, Washington, approximately 8 miles south of the City of Pasco, 2 miles north of the unincorporated community of Wallula, and 7 miles southeast of the unincorporated community of Burbank. The purpose of the proposed power project is to provide energy to meet the needs of the Northwest and other interconnected electric transmission areas where electrical energy is needed. Firm transmission of the power generated by the Wallula Power Project would require construction of a new 500-kilovolt (kV) transmission line and construction of a new switchyard near Smiths Harbor. Approximately 5.1 miles of new transmission line from the proposed generation plant to the new switchyard would be completed. An additional 28 miles of new transmission line from the Smiths Harbor Switchyard to the McNary Substation would be constructed adjacent to the existing Lower Monumental-McNary transmission line and upgrades completed to the existing McNary Substation if loads are exceeded on the existing line. Wallula Generation, LLC, would construct and operate the generation plant and associated facilities, including the makeup water supply line. Bonneville would design, construct, and operate the two 500 kV transmission line segments and switchyard. To supply natural gas to the plant site, a 5.9-mile pipeline interconnection would be engineered, constructed, owned, and operated by PG&E Gas Transmission-Northwest (GTN). This EIS evaluates the environmental impacts of the proposed action, which includes the proposed power plant and 33-mile transmission line. It also evaluates an alternative using taller towers and longer spans between towers along part of the transmission line, and the use of an alternative approach for the transmission line where it would

  15. Northeast Regional Biomass Program

    SciTech Connect (OSTI)

    Lusk, P.D.

    1992-12-01

    The Northeast Regional Biomass Program has been in operation for a period of nine years. During this time, state managed programs and technical programs have been conducted covering a wide range of activities primarily aim at the use and applications of wood as a fuel. These activities include: assessments of available biomass resources; surveys to determine what industries, businesses, institutions, and utility companies use wood and wood waste for fuel; and workshops, seminars, and demonstrations to provide technical assistance. In the Northeast, an estimated 6.2 million tons of wood are used in the commercial and industrial sector, where 12.5 million cords are used for residential heating annually. Of this useage, 1504.7 mw of power has been generated from biomass. The use of wood energy products has had substantial employment and income benefits in the region. Although wood and woodwaste have received primary emphasis in the regional program, the use of municipal solid waste has received increased emphasis as an energy source. The energy contribution of biomass will increase as potentia users become more familiar with existing feedstocks, technologies, and applications. The Northeast Regional Biomass Program is designed to support region-specific to overcome near-term barriers to biomass energy use.

  16. Towards More Transmission Asset Utilization through Real-time Path Rating

    SciTech Connect (OSTI)

    Diao, Ruisheng; Huang, Zhenyu; Jin, Chunlian; Vyakaranam, Bharat GNVSR; Jin, Shuangshuang; Makarov, Yuri V.

    2013-10-21

    Ratings of transmission paths, typically determined in an offline environment, are static and tend to be conservative, leading to underutilization of transmission assets, higher costs of system operation and renewable energy integration, and lower efficiency and savings. With the ever-increasing transmission congestion costs and new challenges from renewable integration, increasing transfer capacity of existing transmission lines is essential. Real-time path rating provides a promising approach to enabling additional power transfer capability and fully utilizing transfer capability. In this paper, the feasibility of real-time path rating is investigated. Several promising technologies to achieve real-time path rating are discussed. Various benefits that can be expected from real-time path rating, such as increased transfer capability and reduced total generation cost, are demonstrated through simulations conducted on the Western Electricity Coordinating Council system model.

  17. Cost estimation of HVDC transmission system of Bangka’s NPP candidates

    SciTech Connect (OSTI)

    Liun, Edwaren Suparman

    2014-09-30

    Regarding nuclear power plant development in Bangka Island, it can be estimated that produced power will be oversupply for the Bangka Island and needs to transmit to Sumatra or Java Island. The distance between the regions or islands causing considerable loss of power in transmission by alternating current, and a wide range of technical and economical issues. The objective of this paper addresses to economics analysis of direct current transmission system to overcome those technical problem. Direct current transmission has a stable characteristic, so that the power delivery from Bangka to Sumatra or Java in a large scale efficiently and reliably can be done. HVDC system costs depend on the power capacity applied to the system and length of the transmission line in addition to other variables that may be different.

  18. EIS-0285: Transmission System Vegetation Management Program

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations. This...

  19. Transmission Reliability Peer Review Materials Now Available

    Broader source: Energy.gov [DOE]

    The Office of Electricity Delivery and Energy Reliability held a peer review of the Transmission Reliability Program on June 10-11, 2015, in Washington, DC. Materials including the agenda and presentations are now available for download.

  20. Wind Energy Transmission | Open Energy Information

    Open Energy Info (EERE)

    Wind Energy Transmission Jump to: navigation, search Photoshop art created from two NREL-PIX photos (10929 & 15185) of a sunset view of electrical power towers combined with wind...

  1. National Electric Transmission Congestion Studies | Department...

    Broader source: Energy.gov (indexed) [DOE]

    National Electric Transmission Congestion Studies Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) ...

  2. National Electric Transmission Congestion Study: Preliminary Findings

    Broader source: Energy.gov [DOE]

    The Department hosted three webinars in August 2012 to receive input and suggestions concerning the preliminary findings of the National Electric Transmission Congestion Study. The updated presentation used in the webinars is now available.

  3. American Transmission Company LLC | Open Energy Information

    Open Energy Info (EERE)

    LLC Jump to: navigation, search Name: American Transmission Company LLC Place: Waukesha, WI References: SGIC1 This article is a stub. You can help OpenEI by expanding it....

  4. Georgia Transmission Corp | Open Energy Information

    Open Energy Info (EERE)

    Corp Jump to: navigation, search Name: Georgia Transmission Corp Place: Georgia References: EIA Form EIA-861 Final Data File for 2010 - File1a1 EIA Form 861 Data Utility Id 7197...

  5. Agenda: Electricity Transmission, Storage and Distribution- West

    Broader source: Energy.gov [DOE]

    The subject of transmission has many facets: its role in bulk power reliability, including how to maintain reliability with a changing resource mix; the planning, cost-allocation and state &...

  6. Electrical Transmission Line Diametrical Retention Mechanism

    DOE Patents [OSTI]

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David; Dahlgren, Scott; Sneddon, Cameron; Briscoe, Michael; Fox, Joe

    2006-01-03

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

  7. Data transmission element for downhole drilling components

    DOE Patents [OSTI]

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David S.; Dahlgren, Scott; Fox, Joe; Sneddon, Cameron; Briscoe, Michael

    2006-01-31

    A robust data transmission element for transmitting information between downhole components, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The data transmission element components include a generally U-shaped annular housing, a generally U-shaped magnetically conductive, electrically insulating element such as ferrite, and an insulated conductor. Features on the magnetically conducting, electrically insulating element and the annular housing create a pocket when assembled. The data transmission element is filled with a polymer to retain the components within the annular housing by filling the pocket with the polymer. The polymer can bond with the annular housing and the insulated conductor but preferably not the magnetically conductive, electrically insulating element. A data transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe.

  8. Load-resistant coaxial transmission line

    DOE Patents [OSTI]

    Hall, David R.; Fox, Joe

    2006-01-03

    A transmission line for downhole tools that make up all or part of a tool string for drilling and production of oil, gas, and geothermal wells that can withstand the dynamic gravitational forces and other accelerations associated with downhole excavations. The transmission line has a metal tube, or outer conductor, that houses a coaxial wire inner conductor. A non-metallic dielectric material is interposed between the inner and outer conductors. The outer and inner conductors and the dielectric are sufficiently compressed together so that independent motion between them is abated. Compression of the components of the transmission line may be achieved by drawing the transmission through one or more dies in order to draw down the outer conductor onto the dielectric, or by expanding the inner conductor against the dielectric using a mandrel or hydraulic pressure. Non-metallic bead segments may be used in aid of the compression necessary to resist the dynamic forces and accelerations of drilling.

  9. National Electric Transmission Congestion Study 2006 Eastern...

    Office of Environmental Management (EM)

    ... transmission, or reducing load to mitigate the ... TLR Procedure or other methods to return the system to a ... - CRA models NOx and SO2 emission rates for all units ...

  10. Exploring the Business Link Opportunity: Transmission & Clean...

    Energy Savers [EERE]

    Weddle, Greenberg Traurig LLP (4.04 MB) Rapid Response Team for Transmission: Laura Smith Morton, DOE (902.5 KB) Energy Storage: Michael Stosser, Day Pitney LLP (1.04 MB) ...

  11. Traction drive automatic transmission for gas turbine engine driveline

    DOE Patents [OSTI]

    Carriere, Donald L.

    1984-01-01

    A transaxle driveline for a wheeled vehicle has a high speed turbine engine and a torque splitting gearset that includes a traction drive unit and a torque converter on a common axis transversely arranged with respect to the longitudinal centerline of the vehicle. The drive wheels of the vehicle are mounted on a shaft parallel to the turbine shaft and carry a final drive gearset for driving the axle shafts. A second embodiment of the final drive gearing produces an overdrive ratio between the output of the first gearset and the axle shafts. A continuously variable range of speed ratios is produced by varying the position of the drive rollers of the traction unit. After starting the vehicle from rest, the transmission is set for operation in the high speed range by engaging a first lockup clutch that joins the torque converter impeller to the turbine for operation as a hydraulic coupling.

  12. X-ray transmissive debris shield

    DOE Patents [OSTI]

    Spielman, Rick B.

    1994-01-01

    A composite window structure is described for transmitting x-ray radiation and for shielding radiation generated debris. In particular, separate layers of different x-ray transmissive materials are laminated together to form a high strength, x-ray transmissive debris shield which is particularly suited for use in high energy fluences. In one embodiment, the composite window comprises alternating layers of beryllium and a thermoset polymer.

  13. Transmission Infrastructure: FERCs Role

    U.S. Energy Information Administration (EIA) Indexed Site

    Transmission Incentives Transmission Incentives P. Kumar Agarwal P. Kumar Agarwal Acting Director, Division of Reliability & Acting Director, Division of Reliability & Engineering Services Engineering Services Federal Energy Regulatory Commission Federal Energy Regulatory Commission U.S. DOE, Energy Information Administration U.S. DOE, Energy Information Administration 2009 Energy Conference 2009 Energy Conference Washington, DC Washington, DC April 7, 2009 April 7, 2009 2 2 History

  14. WINDExchange: Wind Energy Regional Resource Centers

    Wind Powering America (EERE)

    Deployment Activities Printable Version Bookmark and Share Regional Resource Centers About Economic Development Siting Wind Energy Regional Resource Centers The U.S. Department of Energy's Regional Resource Centers provide unbiased wind energy information to communities and decision makers to help them evaluate wind energy potential and learn about wind power's benefits and impacts in their regions. During their first year of operations, the Regional Resource Centers impacted more than 12,000

  15. Regional Shelter Analysis Methodology

    SciTech Connect (OSTI)

    Dillon, Michael B.; Dennison, Deborah; Kane, Jave; Walker, Hoyt; Miller, Paul

    2015-08-01

    The fallout from a nuclear explosion has the potential to injure or kill 100,000 or more people through exposure to external gamma (fallout) radiation. Existing buildings can reduce radiation exposure by placing material between fallout particles and exposed people. Lawrence Livermore National Laboratory was tasked with developing an operationally feasible methodology that could improve fallout casualty estimates. The methodology, called a Regional Shelter Analysis, combines the fallout protection that existing buildings provide civilian populations with the distribution of people in various locations. The Regional Shelter Analysis method allows the consideration of (a) multiple building types and locations within buildings, (b) country specific estimates, (c) population posture (e.g., unwarned vs. minimally warned), and (d) the time of day (e.g., night vs. day). The protection estimates can be combined with fallout predictions (or measurements) to (a) provide a more accurate assessment of exposure and injury and (b) evaluate the effectiveness of various casualty mitigation strategies. This report describes the Regional Shelter Analysis methodology, highlights key operational aspects (including demonstrating that the methodology is compatible with current tools), illustrates how to implement the methodology, and provides suggestions for future work.

  16. EIA - Natural Gas Pipeline Network - Natural Gas Transmission Path Diagram

    U.S. Energy Information Administration (EIA) Indexed Site

    Transmission Path Diagram About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Natural Gas Transmission Path Natural Gas Transmission Path

  17. ARM - AMF2 Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Contacts Management and Operations Operations Overview ARM Links BCR | ECR ECO, EWO Extraview PIF, CAR, DQR & DQPR Operations Status System i.arm.gov AMF2 Deployment...

  18. Line Equipment Operator

    Broader source: Energy.gov [DOE]

    There are several Line Equipment Operator positions located in Washington and Oregon. A successful candidate in this position will perform Line Equipment Operator work operating trucks and all...

  19. State and Regional Policy Assistance - Program Activities | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy State and Regional Policy Assistance - Program Activities State and Regional Policy Assistance - Program Activities Providing Technical Assistance to States and Regions The Electric Markets Technical Assistance Program responds to both immediate and long-terms needs of states, regions, and other organizations to implement policy and market solutions that bring about improved demand response, energy efficiency, renewable energy, and transmission utilization. Examples include:

  20. National Electric Transmission Congestion Study 2006 Area Maps

    Broader source: Energy.gov (indexed) [DOE]

    Electric Transmission National Electric Transmission Congestion Study Congestion Study Congestion Area Maps Congestion Area Maps U.S. Department of Energy U.S. Department of Energy...

  1. An Introduction to Electric Power Transmission | Open Energy...

    Open Energy Info (EERE)

    An Introduction to Electric Power Transmission Jump to: navigation, search OpenEI Reference LibraryAdd to library General: An Introduction to Electric Power Transmission Abstract...

  2. RAPID/BulkTransmission/General Construction | Open Energy Information

    Open Energy Info (EERE)

    RAPIDBulkTransmissionGeneral Construction < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk...

  3. In Situ Transmission Electron Microscopy. (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    In Situ Transmission Electron Microscopy. Citation Details In-Document Search Title: In Situ Transmission Electron Microscopy. Abstract not provided. Authors: Jungjohann, Katherine ...

  4. Wireless Sensor Network for Electric Transmission Line Monitoring...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Wireless Sensor Network for Electric Transmission Line Monitoring Citation Details In-Document Search Title: Wireless Sensor Network for Electric Transmission ...

  5. EIS-0325: Schultz-Hanford Area Transmission Line Project, WA

    Broader source: Energy.gov [DOE]

    BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

  6. National Transmission Grid Study: 2002 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to...

  7. File:0 - Overall Flow - Transmission.pdf | Open Energy Information

    Open Energy Info (EERE)

    - Overall Flow - Transmission.pdf Jump to: navigation, search File File history File usage Metadata File:0 - Overall Flow - Transmission.pdf Size of this preview: 463 599...

  8. Eastern Wind Integration and Transmission Study -- Preliminary Findings: Preprint

    SciTech Connect (OSTI)

    Corbus, D.; Milligan, M.; Ela, E.; Schuerger, M.; Zavadil, B.

    2009-09-01

    This paper reviews the Eastern Wind Integration and Transmission Study, the development of wind datasets, the transmission analysis, and the results of wind integration analysis for four scenarios.

  9. Tribal Renewable Energy Webinar: Transmission and Grid Basics...

    Energy Savers [EERE]

    Transmission and Grid Basics for Tribal Economic and Energy Development Tribal Renewable Energy Webinar: Transmission and Grid Basics for Tribal Economic and Energy Development ...

  10. RAPID/Geothermal/Transmission Siting & Interconnection/Idaho...

    Open Energy Info (EERE)

    Commission (PUC). 12 Transmission Siting Threshold: NIETC - 115kV Public Utility Definition for Transmission Facility: The term "public utility" includes every common...

  11. RAPID/Geothermal/Transmission Siting & Interconnection/Alaska...

    Open Energy Info (EERE)

    exempted through AS 42.05.711. 1 Transmission Siting Threshold: NA Public Utility Definition for Transmission Facility: In Alaska, "public utility' includes every...

  12. DOE Action Plan Addressing the Electricity Transmission System

    Broader source: Energy.gov (indexed) [DOE]

    U.S. DEPARTMENT OF ENERGY ACTION PLAN ADDRESSING THE ELECTRICITY TRANSMISSION SYSTEM DRAFT DOE Action Plan Addressing the Electricity Transmission System 1 Table of Contents * ...

  13. EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon Summary Bonneville ...

  14. EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    81: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River ...

  15. EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY ...

  16. Especial Gear Transmissions s founders | Open Energy Information

    Open Energy Info (EERE)

    Especial Gear Transmissions s founders Jump to: navigation, search Name: Especial Gear Transmissions's founders Place: Spain Product: EGT's founders References: Especial Gear...

  17. Regulatory Roadmap Workshop for Federal Bulk Transmission Regulations...

    Open Energy Info (EERE)

    for bulk transmission. Date: Tuesday, 29 July, 2014 - 09:30 - 15:30 Location: NREL Education Center Auditorium Golden, Colorado Groups: Federal Bulk Transmission Regulatory...

  18. DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 The purpose of...

  19. American Transmission Company LLC II Smart Grid Project | Open...

    Open Energy Info (EERE)

    your syntax: * Display map References ARRA Smart Grid Investment Grants1 American Transmission Smart Grid2 American Transmission Company, LLC has been selected by the U.S....

  20. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comment from Mr. Garrett Plains and Eastern Clean Line Transmission Line: Comment from Ms. Rutherford Plains and Eastern Clean Line Transmission Line: Comment from Ms. Campbell