Powered by Deep Web Technologies
Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations  

Science Conference Proceedings (OSTI)

Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second, market and reliability rules have, understandably, been written around the capabilities and limitations of generators, the historic reliability resources. Responsive load limitations and capabilities are often not accommodated in markets or reliability criteria. Third, because of the institutional structure, demand response alternatives are treated as temporary solutions that can delay but not replace transmission enhancement. Financing has to be based on a three to five year project life as opposed to the twenty to fifty year life of transmission facilities. More can be done to integrate demand response options into transmission expansion planning. Given the societal benefits it may be appropriate for independent transmission planning organizations to take a more proactive role in drawing demand response alternatives into the resource mix. Existing demand response programs provide a technical basis to build from. Regulatory and market obstacles will have to be overcome if demand response alternatives are to be routinely considered in transmission expansion planning.

Kirby, Brendan J [ORNL

2006-07-01T23:59:59.000Z

2

Transmission Expansion in Argentina 5: The Regional Electricity Forum of Buenos Aires Province  

E-Print Network (OSTI)

that adhered to the federal scheme 3 used for expansions and developments at 132 kV or lower, including low voltage grids, isolated generation in small towns, rural electrification and small hydroelectric power plants. Some 3893 km of 132 kV transmission...

Littlechild, Stephen C; Ponzano, Eduardo A

3

Efficiency Benefits of EHV AC Transmission and Overlays in Interregional Transmission Expansion Planning  

Science Conference Proceedings (OSTI)

In the United States, transmission expansion planning historically focused on addressing local utility transmission needs. In the mid-to-late 1990s, the focus shifted to encompass regional transmission expansion, primarily driven by Federal Energy Regulatory Commission (FERC) mandates on open transmission access and emergence of regional transmission organizations. In recent years, three drivers have elevated transmission expansion planning to a higher, interregional level. These drivers are the ...

2012-11-29T23:59:59.000Z

4

Exploration of Resource and Transmission Expansion Decisions  

E-Print Network (OSTI)

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energyin.S. Department of Energy, Office of Electricity Delivery and Energy Reliability, Permitting, Siting and Analysis Division #12;Resource and Transmission ExpansionResource and Transmission Expansion Decisions in WREZ

5

Transmission Expansion Planning Using an AC Model  

E-Print Network (OSTI)

Jan 2, 2013 ... Abstract: Transmission expansion planning (TEP) is a rather complicated process which requires extensive studies to determine when, where ...

6

Transmission Expansion Planning with Re-design  

E-Print Network (OSTI)

Expanding an electrical transmission network requires heavy investments ... Long term transmission expansion planning determines, over an horizon of 10 or more years, ... generation sites are usually far away from the consumption centers.

7

Principles for interregional transmission expansion  

Science Conference Proceedings (OSTI)

In aiming to facilitate the siting of interregional transmission lines, some basic principles might include an approach where the Federal Energy Regulatory Commission uses a variety of tools to capture the value of new transmission, and thus increase the supply of interregional lines. There also may be opportunities for the Commission to work with localities to reduce resistance to new lines by means of economic incentives. Such a tack has the potential to be more efficient than fighting local opposition in the courts. (author)

Benjamin, Richard

2007-10-15T23:59:59.000Z

8

Regional Transmission Projects: Finding Solutions  

Science Conference Proceedings (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

9

Transmission Expansion Planning with Re-design  

E-Print Network (OSTI)

Aug 3, 2009 ... Abstract: Expanding an electrical transmission network requires heavy investments that need to be carefully planned, often at a regional or ...

10

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

11

Exploration of Resource and Transmission Expansion Decisions in  

E-Print Network (OSTI)

coordination among renewable developers, utilities and transmission owners, resource and transmission planners for coordinating transmission expansion in the Western Interconnection. In this report we use a new tool developed Coordinating Council WEIL Western Electric Industry Leaders WGA Western Governors Association WREZ Western

12

Generation and transmission expansion planning for renewable energy integration  

SciTech Connect

In recent years the expansion planning problem has become increasingly complex. As expansion planning (sometimes called composite or integrated resource planning) is a non-linear and non-convex optimization problem, researchers have traditionally focused on approximate models of power flows to solve the problem. The problem has also been split into generation expansion planning (GEP) and transmission network expansion planning (TNEP) to improve computational tractability. Until recently these approximations have produced results that are straight-forward to combine and adapt to the more complex and complete problem. However, the power grid is evolving towards a state where the adaptations are no longer easy (e.g. large amounts of limited control, renewable generation, comparable generation and transmission construction costs) and necessitates new approaches. Recent work on deterministic Discrepancy Bounded Local Search (DBLS) has shown it to be quite effective in addressing the TNEP. In this paper, we propose a generalization of DBLS to handle simultaneous generation and transmission planning.

Bent, Russell W [Los Alamos National Laboratory; Berscheid, Alan [Los Alamos National Laboratory; Toole, G. Loren [Los Alamos National Laboratory

2010-11-30T23:59:59.000Z

13

Regional Transmission Planning Webinar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regional Transmission Planning Webinar Regional Transmission Planning Webinar Regional Transmission Planning Webinar May 29, 2013 11:00AM MDT Webinar The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration (WAPA) are pleased to continue their sponsorship of the Tribal Renewable Energy Webinar Series. As part of a process to develop interconnection-based transmission plans for the Eastern and Western Interconnections and the Electric Reliability Council of Texas (ERCOT), the eight U.S. regional reliability organizations are expanding existing regional transmission planning activities and broadening stakeholder involvement. Hear about the status of the organizations' plans and evaluations of long-term regional transmission

14

Randomized discrepancy bounded local search for transmission expansion planning  

SciTech Connect

In recent years the transmission network expansion planning problem (TNEP) has become increasingly complex. As the TNEP is a non-linear and non-convex optimization problem, researchers have traditionally focused on approximate models of power flows to solve the TNEP. Existing approaches are often tightly coupled to the approximation choice. Until recently these approximations have produced results that are straight-forward to adapt to the more complex (real) problem. However, the power grid is evolving towards a state where the adaptations are no longer easy (e.g. large amounts of limited control, renewable generation) and necessitates new approaches. Recent work on deterministic Discrepancy Bounded Local Search (DBLS) has shown it to be quite effective in addressing this question. DBLS encapsulates the complexity of power flow modeling in a black box that may be queried for information about the quality of proposed expansions. In this paper, we propose a randomization strategy that builds on DBLS and dramatically increases the computational efficiency of the algorithm.

Bent, Russell W [Los Alamos National Laboratory; Daniel, William B [Los Alamos National Laboratory

2010-11-23T23:59:59.000Z

15

A Comparative Study of Metaheuristic Methods for Transmission Network Expansion Planning  

Science Conference Proceedings (OSTI)

Transmission network expansion planning is a very complex and computationally demanding problem due to the discrete nature of the optimization variables. This complexity has increased even more in a restructured deregulated environment. In this regard, ... Keywords: Bacteria Foraging, Genetic Algorithm, Metaheuristics, Particle Swarm Optimization, Transmission Expansion Planning

Ashu R. Verma; P. K. Bijwe; B. Panigrahi

2010-10-01T23:59:59.000Z

16

The Electric Transmission Network: A Multi-Region Analysis  

U.S. Energy Information Administration (EIA)

Modeling and Analysis Papers>The Electric Transmission Network: A Multi-Region Analysis : The Electric Transmission Network: A Multi-Region Analysis

17

A combination of heuristic and bacteria foraging-differential evolution algorithm for transmission network expansion planning with security constraints  

Science Conference Proceedings (OSTI)

Transmission network expansion planning (TNEP) is an important component of power system planning. Its task is to determine the optimal set of transmission lines to be constructed such that the cost of expansion plan is minimum and no network constraints ... Keywords: Transmission expansion planning, compensation approach, hybrid method

Ashu Verma; P. R. Bijwe; B. K. Panigrahi

2010-04-01T23:59:59.000Z

18

Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

Fink, S.; Rogers, J.; Porter, K.

2010-07-01T23:59:59.000Z

19

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

DOE Green Energy (OSTI)

The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this paper we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33percent of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33percent RE target across nearly all scenarios analyzed (38-65percent). Solar energy is almost always the second largest source (14-41percent). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Further, we find that even with total transmission expenditures of $17-34 billion these costs still represent just 10-19percent of the total delivered cost of renewable energy.

Mills, Andrew D.; Phadke, Amol A.; Wiser, Ryan H.

2010-06-10T23:59:59.000Z

20

Electric Transmission Network: A Multi-Region Analysis, The  

Reports and Publications (EIA)

This paper examines the ability of the existing transmission network to respond efficiently to increased trade over four reliability regions in the northeastern United States.

Robert T. Eynon

2000-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

THE PUSH TOWARD GRID REGIONALIZATION IN OPEN ACCESS TRANSMISSION SYSTEMS  

E-Print Network (OSTI)

for the establishment of open access transmission in the US, while the Electricity Directive 96/92 of the European Union robust competition in wholesale electricity markets and mandate transmission-owning utilities to provideTHE PUSH TOWARD GRID REGIONALIZATION IN OPEN ACCESS TRANSMISSION SYSTEMS ProfessorGeorge Gross

Gross, George

22

Coordinated dispatch of regional transmission organizations: Theory and example  

Science Conference Proceedings (OSTI)

In this paper we consider the coordination of economic dispatch across multiple Regional Transmission Organizations (RTOs) to optimize interchange levels, including consideration of the coordination of ''congestion relief'' as practiced in the Eastern ... Keywords: Congestion relief, Economic dispatch, Hierarchical optimization, Interchange optimization, Regional transmission organizations

Ross Baldick, Dhiman Chatterjee

2014-01-01T23:59:59.000Z

23

Policy on regional transmission organizations: Five pitfalls FERC must avoid  

SciTech Connect

In announcing in late November that it would explore what role it might play in developing regional transmission organizations, the Federal Energy Regulatory Commission (FERC) took the first step in a process that will be crucial to capturing maximum regional efficiency from the transmission grid. Ahead, though, lie many obstacles, a FERC commissioner warns.

Massey, W.L. [Federal Energy Regulatory Commission, Washington, DC (United States)

1999-03-01T23:59:59.000Z

24

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

SciTech Connect

Building transmission to reach renewable energy (RE) goals requires coordination among renewable developers, utilities and transmission owners, resource and transmission planners, state and federal regulators, and environmental organizations. The Western Renewable Energy Zone (WREZ) initiative brings together a diverse set of voices to develop data, tools, and a unique forum for coordinating transmission expansion in the Western Interconnection. In this report we use a new tool developed in the WREZ initiative to evaluate possible renewable resource selection and transmission expansion decisions. We evaluate these decisions under a number of alternative future scenarios centered on meeting 33% of the annual load in the Western Interconnection with new renewable resources located within WREZ-identified resource hubs. Of the renewable resources in WREZ resource hubs, and under the assumptions described in this report, our analysis finds that wind energy is the largest source of renewable energy procured to meet the 33% RE target across nearly all scenarios analyzed (38-65%). Solar energy is almost always the second largest source (14-41%). Solar exceeds wind by a small margin only when solar thermal energy is assumed to experience cost reductions relative to all other technologies. Biomass, geothermal, and hydropower are found to represent a smaller portion of the selected resources, largely due to the limited resource quantity of these resources identified within the WREZ-identified hubs (16-23% combined). We find several load zones where wind energy is the least cost resource under a wide range of sensitivity scenarios. Load zones in the Southwest, on the other hand, are found to switch between wind and solar, and therefore to vary transmission expansion decisions, depending on uncertainties and policies that affect the relative economics of each renewable option. Uncertainties and policies that impact bus-bar costs are the most important to evaluate carefully, but factors that impact transmission costs and the relative market value of each renewable option can also be important. Under scenarios in which each load zone must meet 33% of its load with delivered renewable energy from the WREZ-identified resource hubs, the total transmission investment required to meet the 33% west-wide RE target is estimated at between $22 billion and $34 billion. Although a few of the new transmission lines are very long - over 800 miles - most are relatively short, with average transmission distances ranging from 230-315 miles, depending on the scenario. Needed transmission expenditure are found to decline to $17 billion if wide use of renewable energy credits is allowed; consideration of renewable resources outside of WREZ-identified hubs would further reduce this transmission cost estimate. Even with total transmission expenditures of $17-34 billion, however, these costs still represent just 10-19% of the total delivered cost of renewable energy.

Mills, Andrew; Phadke, Amol; Wiser, Ryan

2010-02-16T23:59:59.000Z

25

May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 29 Tribal Renewable Energy Webinar to Highlight Regional May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 24, 2013 - 3:41pm Addthis The U.S. Department of Energy Office of Indian Energy, the DOE Office of Energy Efficiency and Renewable Energy's Tribal Energy Program, and the Western Area Power Administration (WAPA) will present the next Tribal Renewable Energy Series webinar, "Regional Transmission Planning," on Wednesday, May 29, 2013, from 1:00 p.m. to 2:30 p.m. Eastern Time. Speakers from WAPA's Rocky Mountain Region, its Upper Great Plains Region, and WestConnect will provide an overview of various interconnection-based regional transmission planning efforts. Helpful background information on

26

May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 29 Tribal Renewable Energy Webinar to Highlight Regional May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 29 Tribal Renewable Energy Webinar to Highlight Regional Transmission Planning Efforts May 24, 2013 - 3:41pm Addthis The U.S. Department of Energy Office of Indian Energy, the DOE Office of Energy Efficiency and Renewable Energy's Tribal Energy Program, and the Western Area Power Administration (WAPA) will present the next Tribal Renewable Energy Series webinar, "Regional Transmission Planning," on Wednesday, May 29, 2013, from 1:00 p.m. to 2:30 p.m. Eastern Time. Speakers from WAPA's Rocky Mountain Region, its Upper Great Plains Region, and WestConnect will provide an overview of various interconnection-based regional transmission planning efforts. Helpful background information on

27

Comments in response to FERC rulemaking on regional transmission organizations  

E-Print Network (OSTI)

On May 13, 1999, the Federal Energy Regulatory Commission (FERC) issued a Notice of Proposed Rulemaking (NOPR) on Regional Transmission Organizations (RTO). The purpose of the NOPR is to solicit comments on proposed FERC ...

Joskow, Paul L.

1999-01-01T23:59:59.000Z

28

Moving Beyond Paralysis: How States and Regions Are Creating Innovative Transmission Projects; May 2009 - May 2010  

DOE Green Energy (OSTI)

This report profiles certain state and regional transmission policy initiatives aimed at promoting transmission development, mainly to access renewable resources.

Schumacher, A.; Fink, S.; Porter, K.

2009-10-01T23:59:59.000Z

29

NREL: Energy Analysis: Transmission Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

30

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

Capacity Factor ITC Availability Transmission Cost 500 kVwhere the availability of transmission-congestion managementxiv New Transmission Capacity (GW-mi) 16K availability of

Mills, Andrew

2010-01-01T23:59:59.000Z

31

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

plus the cost of transmission and line losses to deliver thecapacity investment. Transmission and line losses make upbuilding a new 500 kV transmission line delivering roughly

Mills, Andrew D

2011-01-01T23:59:59.000Z

32

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

regarding transmission costs, availability of federal taxtransmission, technology options, resource costs, availabilityon availability in WREZ resource hubs. The transmission

Mills, Andrew D

2011-01-01T23:59:59.000Z

33

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

plus the cost of transmission and line losses to deliver thecapacity investment. Transmission and line losses make upA fully subscribed transmission line is one in which the

Mills, Andrew D

2011-01-01T23:59:59.000Z

34

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

to be wind energy. Transmission and line losses, however,plus the cost of transmission and line losses to deliver themay be substantial, transmission and line loss costs only

Mills, Andrew

2010-01-01T23:59:59.000Z

35

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

Hild. 2004. “The Value of Wind Energy as a Function of Wind2: Capacity credit. ” Wind Energy 3(4): 167–206. Milligan,of Transmission for Wind Energy: A Review of Transmission

Mills, Andrew

2010-01-01T23:59:59.000Z

36

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

reduction in average renewable energy costs WECC-wide byto reduce the average renewable energy costs WECC-wide byscenarios on renewable energy supply costs and transmission

Mills, Andrew

2010-01-01T23:59:59.000Z

37

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

Integration costs for PV and solar thermal without thermalwithout Storage Fixed PV Equal Solar Finance Solar Cost LowDry Cooled Solar Thermal with Storage Fixed PV Transmission

Mills, Andrew D

2011-01-01T23:59:59.000Z

38

Central Wind Power Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities  

DOE Green Energy (OSTI)

The report addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America.

Porter, K.; Rogers, J.

2009-12-01T23:59:59.000Z

39

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

The case of wind electricity in Spain. ” Energy Policy 36(9)wind power in a carbon constrained world. ” Energy Policywind in transmission-constrained electric power systems. ” Energy Policy

Mills, Andrew

2010-01-01T23:59:59.000Z

40

Implications of Regional Transmission Organization Design for Renewable Energy Technologies  

DOE Green Energy (OSTI)

This report summarizes the development of Regional Transmission Organizations (RTOs) and assesses the potential implications of market rules for renewable energy technologies. The report focuses on scheduling provisions, as these have proved problematic in some cases for intermittent renewable energy technologies. Market rules of four RTOs-the Pennsylvania-Maryland-New Jersey ISO, the ERCOT ISO, the Midwest ISO and the New York ISO (NYISO)-were examined to determine the impact on intermittent renewable energy projects such as wind energy generators. Also, a more general look was taken at how biomass power may fare in RTOs, specifically whether these technologies can participate in ancillary service markets. Lastly, an assessment was made regarding the implications for renewable energy technologies of a Northeast-wide RTO that would combine the three existing Northeast ISOs (the aforementioned PJM and NYISOs, as well as ISO New England).

Porter, K.

2002-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

42

Central Wind Forecasting Programs in North America by Regional Transmission Organizations and Electric Utilities: Revised Edition  

DOE Green Energy (OSTI)

The report and accompanying table addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America. The first part of the table focuses on electric utilities and regional transmission organizations that have central wind power forecasting in place; the second part focuses on electric utilities and regional transmission organizations that plan to adopt central wind power forecasting in 2010. This is an update of the December 2009 report, NREL/SR-550-46763.

Rogers, J.; Porter, K.

2011-03-01T23:59:59.000Z

43

Moving beyond paralysis: how states and regions are creating innovative transmission policies for renewable energy projects  

SciTech Connect

Experience from state and regional transmission siting initiatives aimed at expanding renewable energy development might offer lessons on how to circumvent traditional barriers to new transmission. Absent a national approach or federal transmission plan, these early models will provide a framework for increasing interstate cooperation. (author)

Schumacher, Allison; Fink, Sari; Porter, Kevin

2009-08-15T23:59:59.000Z

44

Midwest Independent Transmission System Operator (MISO) Energy Storage Study  

Science Conference Proceedings (OSTI)

Midwest Independent Transmission System Operator (MISO) is a nonprofit member-based organization regulated by the Federal Energy Regulatory Commission (FERC). As a Regional Transmission Organization (RTO), MISO provides electricity consumers in 13 states with regional grid management and open access to transmission facilities at a tariff closely regulated by FERC. MISO follows a cycle known as the MISO Transmission Expansion Plan (MTEP) that results in annual recommendations to proceed with expansion pro...

2012-02-29T23:59:59.000Z

45

Spectra of Reciprocal Transmission: Generalization to Saturated Regions  

Science Conference Proceedings (OSTI)

The results of Munk et al. (1981), relating spectra of ocean sound-speed and water-particle velocity to observable acoustic spectra are applicable only in the geometrical optics region. It is shown that analogous formulas that are valid in the ...

Stanley M. Flatté

1981-04-01T23:59:59.000Z

46

WECC releases its first-ever transmission plan for the Western...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Interconnection. The Plan was developed through WECC's Regional Transmission Expansion Planning (RTEP) project, as part of a grant from the U.S. Department of Energy...

47

Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

48

Regional Transmission Organizations and Wind Energy: A Happy Marriage or Divorce Proceedings?; Preprint  

SciTech Connect

In 1996, the Federal Energy Regulatory Commission (FERC) issued Order 888, which required transmission-owning utilities under FERC jurisdiction to provide open access transmission service to eligible wholesale power customers. Among other things, the elements of electric service are unbundled, meaning that wind project developers must not only find a taker for the energy but also potentially make interconnection, ancillary service, and transmission arrangements for their wind projects. In 1999, the FERC issued Order 2000, which required transmission-owning utilities to file an intent with FERC on whether they have joined or plan to join a regional transmission organization (RTO). Order 2000 also required RTOs to meet certain criteria and be approved by FERC in order to begin operations as an RTO. More recently, FERC said it would issue a Notice of Proposed Rulemaking in 2002 on certain requirements and services, often termed''standard market design'' (SMD), that must be included in all transmission tariffs filed at FERC. This paper discusses the chronology of open access transmission issues, from Order 888 onward, and reviews some of the important issues raised by FERC's SMD initiative.

Parsons, B.; Porter, K.

2002-05-01T23:59:59.000Z

49

Abstract--Transmission expansion in fast growing economies imposes severe challenges to electricity markets, given the need  

E-Print Network (OSTI)

and persistent increases in the per capita energy consumption bring about high electricity load growth rates of uncertainty in load growth and generation expansion, coupled to the arrival of distributed renewable energy, and problems currently faced by different stakeholders. Renewable energy projects have experienced

Catholic University of Chile (Universidad Católica de Chile)

50

Flexible gas insulated transmission line having regions of reduced electric field  

DOE Patents (OSTI)

A gas insulated transmission line having radially flexible field control means for reducing the electric field along the periphery of the inner conductor at predetermined locations wherein the support insulators are located. The radially flexible field control means of the invention includes several structural variations of the inner conductor, wherein careful controlling of the length to depth of surface depressions produces regions of reduced electric field. Several embodiments of the invention dispose a flexible connector at the predetermined location along the inner conductor where the surface depressions that control the reduced electric field are located.

Cookson, Alan H. (Pittsburgh, PA); Fischer, William H. (Wilkins Township, Allegheny County, PA); Yoon, Kue H. (Pittsburgh, PA); Meyer, Jeffry R. (Penn Hills Township, Allegheny County, PA)

1983-01-01T23:59:59.000Z

51

Elimination of higher-order diffraction using zigzag transmission grating in soft x-ray region  

Science Conference Proceedings (OSTI)

We present a realization of the sinusoidal transmission function using a series of zigzag-profiled strips where the transmission takes on the binary values 0 and 1 in a two-dimensional distribution. A zigzag transmission grating of 1000 line/mm has been fabricated and demonstrated on the soft x-ray beam of synchrotron radiation. The axial single-order diffraction indicates that the zigzag transmission grating is adequate for spectroscopic application.

Zang, H. P.; Wang, C. K. [Research Center of Laser Fusion, China Academy of Engineering Physics, Mianyang, Sichuan 621900 (China); Institute of Atomic and Molecular Physics, Sichuan University, Chengdu 610065 (China); Gao, Y. L.; Zhou, W. M.; Kuang, L. Y.; Wei, L.; Fan, W.; Zhang, W. H.; Zhao, Z. Q.; Cao, L. F.; Gu, Y. Q.; Zhang, B. H. [Research Center of Laser Fusion, China Academy of Engineering Physics, Mianyang, Sichuan 621900 (China); Jiang, G. [Institute of Atomic and Molecular Physics, Sichuan University, Chengdu 610065 (China); Zhu, X. L.; Xie, C. Q. [Institute of Microelectronics, Chinese Academy of Sciences, Beijing 100029 (China); Zhao, Y. D.; Cui, M. Q. [Institute of High Energy Physics, Chinese Academy of Sciences, Beijing 100049 (China)

2012-03-12T23:59:59.000Z

52

Electromagnetic interference from transmission lines located in central region of Saudi Arabia  

Science Conference Proceedings (OSTI)

This paper discusses the electromagnetic interference (EMI) generated by transmission lines operating in the Central Region of Saudi Arabia. These lines have operating voltages of 132, 230 and 380 kV and are located in a hot, dry arid desert land where precipitaton is very low. Measurements of typical EMI characteristics such as frequency spectrum, lateral profile and statistical variation are performed for each type of line and results are analyzed. It is found that general noise characteristic of these lines are similar to those reported in the literature for other lines which are located in relatively wet environment. The results further show that if operating gradients are low, the increase of EMI due to rain is lower than 20 dB value usually observed. The presence of sand and dust storms does not increase EMI level in any appreciable manner. The fair weather EMI level of these lines can be predicted with reasonable accuracy by using the CIGRE formula. Results are also presented for power line carrier related EMI.

Al-Arainy, A.A.; Malik, N.H.; Abdul-Aal, L.N.

1988-01-01T23:59:59.000Z

53

Electromagnetic interference from transmission lines located in central region of Saudi Arabia  

Science Conference Proceedings (OSTI)

This paper discusses the electromagnetic interference (EMI) generated by transmission lines operating in the Central Region of Saudi Arabia. These lines have operating voltages of 132, 230 and 380 kV and are located in a hot, dry arid desert land where precipitation is very low. Measurements of typical EMI characteristics such as frequency spectrum, lateral profile and statistical variation are performed for each type of line and results are analyzed. It is found that general noise characteristic of these lines are similar to those reported in the literature for other lines which are located in relatively wet environment. The results further show that if operating gradients are low, the increase of EMI due to rain is lower than 20 dB value usually observed. The presence of sand and dust storms does not increase EMI level in any appreciable manner. The fair weather EMI level of these lines can be predicted with reasonable accuracy by using the CIGRE formula. Results are also presented for power line carrier related EMI.

Al-Arainy, A.A.; Malik, N.H.; Abdul-Aal, L.N.

1989-01-01T23:59:59.000Z

54

OPTIMIZING TRANSMISSION SERVICE COST OF KHUZESTAN REGIONAL GRID BASED ON NSGA?II ALGORITHM  

Science Conference Proceedings (OSTI)

Any plan for modeling the components of transmission service costs should be able to consider congestion as well as loss cost. Assessing the real value of congestion and loss costs in each network has a substantial contribution to analyze the grid’s weaknesses in order to release capacity of power network. As much as the amount of congestion and loss costs in the transmission grid reduces the amount of power passing through transmission lines increases. Therefore

Alireza Tavakoli Shooshtari; Mahmood Joorabian; Armin Ebrahimi Milani; Arash Gholamzadeh

2011-01-01T23:59:59.000Z

55

Electricity Transmission Data Needs Focus Group Results  

U.S. Energy Information Administration (EIA)

power, transmission flows within states, the implications of transmission on capacity expansion decisions and costs; age of transformers and other facilities;

56

JILA Expansion: Preparing the Next Generation of Physicists  

Science Conference Proceedings (OSTI)

JILA Expansion: Preparing the Next Generation of Physicists (+$13 million). ... could lead to dramatically more efficient electrical power transmission. ...

2010-10-05T23:59:59.000Z

57

Public policy and private interests: why transmission planning and cost-allocation methods continue to stifle renewable energy policy goals  

SciTech Connect

It has been almost 10 years since FERC Order 2000 created regional transmission organizations and independent system operators in order to establish competitive power markets and to stimulate the development of new transmission. Now, the dominant behavior of the incumbent transmission owners, expressed through their RTO and ISO transmission expansion planning processes, is at loggerheads with public policies aimed at developing renewable energy resources. (author)

Puga, J. Nicolas; Lesser, Jonathan A.

2009-12-15T23:59:59.000Z

58

Transmission Planning for Wind Energy: Status and Prospects  

Science Conference Proceedings (OSTI)

This paper provides an overview of major transmission planning activities related to wind integration studies in the US and Europe. Transmission planning for energy resources is different from planning for capacity resources. Those differences are explained, and illustrated with examples from several regions of the US and Europe. Transmission planning for wind is becoming an iterative process consisting of generation expansion planning, economic-based transmission planning, system reliability analysis, and wind integration studies. A brief look at the policy environment in which this activity is taking place is provided.

Smith, J. C.; Osborn, D.; Piwko, R.; Zavadil, R.; Parsons, B.; Hawkins, D.; Lasher, W.; Nickell, B.

2009-01-01T23:59:59.000Z

59

Using a Collaborative Approach to Interconnection-Wide Transmission Analyses  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Planning in Interconnection-Wide Planning in the Eastern Interconnection EIPC Update for the DOE Electricity Advisory Committee October 20, 2011 David A. Whiteley Presentation Topics * Update on process and structure * Study results so far * Value unlocked * What's next 2 Update on Process and Structure * EIPC - 26 EI Planning Authorities (Planning Coordinators) * Integrate and analyze approved regional plans * Develop interregional expansion scenarios to be studied * Develop interregional transmission expansion options * Consistent with Orders 890 and 1000 * Self-funded * Primary activity is DOE funded interconnection studies project - 2 phases 3 Who are the PAs? * Alcoa Power Generating * American Transmission Co. * Duke Energy Carolinas * Electric Energy Inc. * Entergy *

60

Transmission Planning: Institutional Issues in the West | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning: Institutional Issues in the West Transmission Planning: Institutional Issues in the West Prepared for The CREPC Transmission Planning and Expansion Work Group by the...

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

High DSM Scenario Request for the 2011 TEPPC Transmission Expansion Plan (and Treatment of DSM in Reference Case/Other Scenarios) Recommendation of the State/Provincial Steering Committee DSM Working Group  

E-Print Network (OSTI)

At the November 6, 2009 meeting of the State-Provincial Steering Committee (SPSC), the SPSC agreed that it would submit a high DSM scenario to TEPPC and requested that the DSM Working Group prepare the request, for review and approval by the SPSC. This document outlines the approach recommended by the DSM Work Group for developing a high DSM scenario, to be modeled in the 2011 TEPPC 10-Year Transmission Expansion Plan. 1 In addition, the DSM Working Group has developed recommendations for the treatment of DSM in the reference case and two scenarios (Carbon Reduction and Breakthrough Technology) proposed by the Scenario Working Group. Table 1 sets for the recommended approach for these items, for energy efficiency (EE), demand response (DR), combined heat and power (CHP) and distribution system efficiency upgrades. These recommendations have been informed by the technical assistance of Lawrence Berkeley National Laboratory (LBNL) and the non-state officials participating in the DSM Working Group, as well as the state official/commissioner members of the Group.

unknown authors

2009-01-01T23:59:59.000Z

62

EIS-0404: Los Vaqueros Reservoir Expansion Project, California | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

404: Los Vaqueros Reservoir Expansion Project, California 404: Los Vaqueros Reservoir Expansion Project, California EIS-0404: Los Vaqueros Reservoir Expansion Project, California Summary This EIS/Environmental Impact Report was prepared by the Department of the Interior (Bureau of Reclamation, Mid-Pacific Region) and the Contra Costa Water District to evaluate the environmental impacts of a proposal to enlarge the existing Los Vaqueros Reservoir in Contra Costa County, California. DOE's Western Area Power Administration (Western) was a cooperating agency because it has jurisdiction over transmission facilities that were expected to be relocated under the proposed action. Based on project changes, however, Western has no action and therefore will not adopt the EIS or issue a ROD. Public Comment Opportunities No public comment opportunities available at this time.

63

Exploration of Resource and Transmission Expansion Decisions...  

NLE Websites -- All DOE Office Websites (Extended Search)

Renewable Energy Zone Initiative Publication Type Report Year of Publication 2010 Authors Mills, Andrew D., Amol Phadke, and Ryan H. Wiser Pagination 88 Date Published 022010...

64

Transmission Expansion Planning Using an AC Model ...  

E-Print Network (OSTI)

This work is supported in part by the U.S. Department of Energy funded project denominated ... market process, electric utilities have gradually realized that a well-planned ..... close and provides key information about the original problem. For TEP ..... In steady state power system analysis, it is usually assumed that,. 0.95.

65

DOE/EIS-0285/SA-101: Supplement Analysis for the Transmission System Vegetation Management Program FEIS Spokane Region (9/13/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13, 13, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-101) Spokane Region Michael F. Brock - TFS/BELL-1 Regional Manager, Spokane Region Proposed Action: Vegetation Management for Substations and Non-Electric Facilities (See Attachment A for a complete list of facilities) Location: Spokane Region. (See Attachment A) Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities. Vegetation management within the substation shall include the bare ground management of all graveled areas. These areas shall primarily be maintained with the use of herbicides. The management of vegetation outside the substation and associated facilities shall include: 1) bare

66

Western Area Power Administration, Desert Southwest Region Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm  

NLE Websites -- All DOE Office Websites (Extended Search)

Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Replacements at Structure 0/7 - Continuation Sheet Special Conditions Biological Resources 1. To avoid impacts to nesting birds, project activities will be scheduled between August 1 and February 15, as feasible. Crews shall not cause injury or death to nesting birds, active nests, eggs, or nestlings. If evidence of a nesting bird is found in the project area, crews shall immediately stop work in that area until Western's Environmental Group has been contacted. 2. A qualified biologist will be present during all project activities and serve as the project's Biological Monitor. The Biological Monitor will be authorized by Western to temporarily halt construction activity if needed to prevent harm to desert tortoise. The Biological Monitor's

67

Estimating the Economic 'Trade' Value of Increased Transmission Capability  

Science Conference Proceedings (OSTI)

The authors offer a new method of estimating the potential gains achievable via transmission expansion in moving power from lower-priced to higher-priced regions. Rather than relying on simulation approaches, where electricity is dispatched based on specific assumptions regarding market-bidding behavior, plant generating costs, and plant availability, this technique instead relies on actual market data to estimate this source of economic value. (author)

Kleit, Andrew N.; Reitzes, James D.

2006-03-01T23:59:59.000Z

68

Transmission INTRODUCTION  

E-Print Network (OSTI)

Transmission INTRODUCTION An electrical power system requires constant, second by second, balancing to maintain control over the transmission system can result in failure of the entire electrical system of supply, demand, and transmission capability. Transmission system operators are primarily responsible

69

Electric Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

70

NREL: Regional Energy Deployment System (ReEDS) Model - Capabilities...  

NLE Websites -- All DOE Office Websites (Extended Search)

storage capacity expansion, transmission capacity expansion, total electric sector costs, electricity price, fuel prices, and carbon dioxide (CO2) emissions. Figure 1 shows an...

71

Green Island Power Authority Transmission Voltage Support System...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(2009?) Potential 2nd generation HTSC link to 100 MW hydro Control and quality Industrial load expansion requires high power quality Emergency islanding capability Transmission...

72

DOE Electricity Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(including regional diversity, AC-DC transmission and distribution solutions, microgrids, energy storage, and centralized-decentralized control) * Accommodates two-way flows...

73

Reliabilit PlanningReliability Planning David Duebner, Expansion Planningp g  

E-Print Network (OSTI)

EE552 Reliabilit PlanningReliability Planning David Duebner, Expansion Planningp g September 27, 2010 #12;Reliability Planning OverviewReliability Planning Overview · Midwest ISO Transmission Expansion Plan (MTEP)p ( ) · MTEP Reliability Study Process ­ Planning Criteriag ­ Reliability Analysis

McCalley, James D.

74

Great Plains Wind Energy Transmission Development Project  

DOE Green Energy (OSTI)

In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the EERC, in collaboration with Meridian Environmental Services, developed and demonstrated the efficacy of a wind energy forecasting system for use in scheduling energy output from wind farms for a regional electrical generation and transmission utility. With the increased interest at the time of project award in the production of hydrogen as a critical future energy source, many viewed hydrogen produced from wind-generated electricity as an attractive option. In addition, many of the hydrogen production-related concepts involve utilization of energy resources without the need for additional electrical transmission. For this reason, under Task 4, the EERC provided a summary of end uses for hydrogen in the region and focused on one end product in particular (fertilizer), including several process options and related economic analyses.

Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

2012-06-09T23:59:59.000Z

75

Brazil and the electrical interconnections in the Mercosul Region  

Science Conference Proceedings (OSTI)

This article describes the state of relations among the four countries that form Mercosul, the common market that is being formed by Argentina, Brazil, Paraguay, and Uruguay, and the prospects for expansion of international electric energy commerce and exchanges in that region. The first part presents the main supply facilities already available, including hydroelectric power plants, power stations, frequency conversion stations, and transmission lines. The second part focuses on the status of the Brazilian electric power sector and analyzes some of its features that are considered to be an incentive to the expansion of the electric energy international commerce in the Mercosul region.

Alqueres, J.L.

1994-06-01T23:59:59.000Z

76

PROPOSAL FOR CONTINGENT TRANSMISSION PLANS  

E-Print Network (OSTI)

How should the WECC’s RTEP process develop a 10-year transmission plan based upon transmission studies completed over the past several years? This paper explores the notion of a “plan ” that consists of a package containing a small number of “contingent plans ” that would correspond to a limited number of future states of the world by 2020. The rationale for developing transmission plans on a contingent basis is based on the following observations. Contingencies. Insights from TEPPC transmission planning over the past several years indicate that the demand for future transmission expansion in the West is contingent upon a number of important drivers including: (1) Levels of state renewable portfolio standards (RPS); (2) Development of remote versus local renewable generation; (3) Load growth given DSM policies and economic growth; (4) Policies to reduce greenhouse gas (GHG) emissions; (5) Shifts of innovation and cost competitiveness between wind and solar energy; (6) Advances in distributed generation technologies;

unknown authors

2010-01-01T23:59:59.000Z

77

Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Transmission Planning We accept requests from electric utilities, firm-power customers, private power developers, and independent power generators to interconnect...

78

California/Transmission | Open Energy Information  

Open Energy Info (EERE)

California/Transmission California/Transmission < California Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in California is part of the WestConnect Transmission Planning area and the California Transmission Planning Group. The desert southwest region of California belongs to the Southwest Area Transmission power grid and the northern region of the state belongs to the Sierra Subregional Planning Group. The SWAT provides the technical forum required to complete reliability assessments, develop joint business opportunities and accomplish

79

MAP 5.50: PJM Service Area in Virginia PJM operates the electric transmission system in Virginia served by Allegheny Power (AP), American  

E-Print Network (OSTI)

(DOM), as shown on MAP 5.50. The transmission system in Virginia delivers power to customers from native generation resources and power transfers across tie-line facilities with the rest of the PJM and other adjoining systems to the west and south. Critical RTEP Issues in Virginia PJM continues to address a number of issues with a bearing on reliability in Virginia and the regional transmission expansion plans required to maintain it: A new 502 Junction-Mt. Storm-Meadowbrook-Loudoun 500kV transmission line is needed to avoid reliability criteria violations in 2011 and maintain power transfers to serve northern

unknown authors

2007-01-01T23:59:59.000Z

80

An incentive-based mechanism for transmission asset investment  

Science Conference Proceedings (OSTI)

This paper presents an incentive scheme to encourage investment in the improvement and expansion of the transmission in the competitive electricity market environment. To create these incentives, a decentralized transmission asset investment model is ... Keywords: Cooperative game theory, Investment incentives, Shapley value, Social welfare, Transmission planning

Javier Contreras; George Gross; José Manuel Arroyo; José Ignacio Muñoz

2009-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Semiclassical transmission across transition states  

E-Print Network (OSTI)

It is shown that the probability of quantum-mechanical transmission across a phase space bottleneck can be compactly approximated using an operator derived from a complex Poincar\\'e return map. This result uniformly incorporates tunnelling effects with classically-allowed transmission and generalises a result previously derived for a classically small region of phase space.

Stephen C. Creagh

2005-06-01T23:59:59.000Z

82

Reissner-Nordstrom Expansion  

E-Print Network (OSTI)

We propose a classical mechanism for the cosmic expansion during the radiation-dominated era. This mechanism assumes that the Universe is a two-component gas. The first component is a gas of ultra-relativistic "normal" particles described by an equation of state of an ideal quantum gas of massless particles. The second component consist of "unusual" charged particles (namely, either with ultra-high charge or with ultra-high mass) that provide the important mechanism of expansion due to their interaction with the "normal" component of the gas. This interaction is described by the Reissner--Nordstr\\"om metric purely geometrically -- the ``unusual'' particles are modeled as zero-dimensional naked singularities inside spheres of gravitational repulsion. The radius of a repulsive sphere is inversely proportional to the energy of an incoming particle or the temperature. The expansion mechanism is based on the inflating of the "unusual" particles (of charge $Q$) with the drop of the temperature -- this drives apart all neutral particles and particles of specific charge $q/m$ such that ${sign}(Q) q/m \\ge - 1$. The Reissner--Nordstr\\"om expansion naturally ends at recombination. We discuss the range of model parameters within which the proposed expansion mechanism is consistent with the restrictions regarding quantum effects.

Emil M. Prodanov; Rossen I. Ivanov; V. G. Gueorguiev

2007-03-01T23:59:59.000Z

83

The Universe Adventure - Expansion  

NLE Websites -- All DOE Office Websites (Extended Search)

Expansion: Chunk-by-Chunk Expansion: Chunk-by-Chunk A sample of the Universe. A very small portion of the Universe. In order to better understand the significance of expansion, let's look at a cubic sample of space. By considering a finite volume we can follow changes in the size of the Universe as we move forwards and backwards in time. Remember, only the size of the cube will change. The galaxies inside the cube stay the same size. This animation illustrates how our cubic piece of the Universe changes with time. If the Universe followed the simplest expansionary models, its size would increase linearly with time. The Universe would continue to expand at a constant rate forever. If you look at only a narrow time-slice of the Universe's history, it does, in fact, appear that this is how the Universe

84

Cooperation (Transmission  

E-Print Network (OSTI)

Pricing in Wireless Networks Peter Marbach Department of Computer Science University of Toronto #12; Model/Terminology A B #15; Routes are Fixed #15; C r : Capacity of Node r #15; U r (x r ): Utility Function of Node r 6 #12; Model/Terminology #15; x r : Transmission Rate of Node r #15; y r

Marbach, Peter

85

Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission  

E-Print Network (OSTI)

Sixth Northwest Conservation and Electric Power Plan Chapter 7: Transmission Summary of Key..................................................................................................................................... 1 Northwest Transmission Planning), there was concern that there had been little progress on addressing the developing transmission issues in the region

86

Assumptions to the Annual Energy Outlook 2000 - Natural Gas Transmission  

Gasoline and Diesel Fuel Update (EIA)

Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each forecast year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. In addition, natural gas flow patterns are a function of the pattern in the previous year, coupled with the relative prices of gas supply options as translated to the represented market “hubs.” The major assumptions used within the NGTDM are grouped into five general categories. They relate to (1) the classification of demand into core and noncore transportation service classes, (2) the pricing of transmission and distribution services, (3) pipeline and storage capacity expansion and utilization, (4) the implementation of recent regulatory reform, and (5) the implementation of provisions of the Climate Change Action Plan (CCAP). A complete listing of NGTDM assumptions and in-depth methodology descriptions are presented in Model Documentation: Natural Gas Transmission and Distribution Model of the National Energy Modeling System, Model Documentation 2000, DOE/EIA-M062(2000), January 2000.

87

Assumptions to the Annual Energy Outlook 1999 - Natural Gas Transmission  

Gasoline and Diesel Fuel Update (EIA)

The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each forecast year. These are derived by obtaining market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. In addition, natural gas flow patterns are a function of the pattern in the previous year, coupled with the relative prices of gas supply options as translated to the represented market “hubs.” The major assumptions used within the NGTDM are grouped into five general categories. They relate to (1) the classification of demand into core and noncore transportation service classes, (2) the pricing of transmission and distribution services, (3) pipeline and storage capacity expansion and utilization, (4) the implementation of recent regulatory reform, and (5) the implementation of provisions of the Climate Change Action Plan (CCAP). A complete listing of NGTDM assumptions and in-depth methodology descriptions are presented in Model Documentation Report: Natural Gas Transmission and Distribution Model of the National Energy Modeling System, DOE/EIA-MO62/1, January 1999.

88

Bed expansion crucible tests  

SciTech Connect

The Am/Cm program will vitrify the americium and curium currently stored in F-canyon. A batch flowsheet has been developed (with non-radioactive surrogate feed in place of the F-canyon solution) and tested full-scale in the 5-inch Cylindrical Induction Melter (CIM) facility at TNX. During a normal process run, a small bed expansion occurs when oxygen released from reduction of cerium (IV) oxide to cerium (III) oxide is trapped in highly viscous glass. The bed expansion is characterized by a foamy layer of glass that slowly expands as the oxygen is trapped and then dissipates when the viscosity of the foam becomes low enough to allow the oxygen to escape. Severe bed expansions were noted in the 5-inch CIM when re-heating after an interlock during the calcination phase of the heat cycle, escaping the confines of the melter vessel. In order to better understand the cause of the larger than normal bed expansion and to develop mitigating techniques, a series of three crucible tests were conducted.

Stone, M.E.

2000-04-04T23:59:59.000Z

89

2012 CERTS R&M Peer Review - Summary: Transmission Investment Under Uncertainty - Ben Hobbs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Investment Assessment Under Uncertainty about Fuel Prices, Investment Assessment Under Uncertainty about Fuel Prices, Technology, Renewables Penetration and Market Responses using a Multi-Stage Stochastic Model Approach with Recourse (Year 2) Project Lead: Hobbs Co-investigators: Schuler, Zimmerman July 20, 2012 1. Project objective To develop and apply a methodology for evaluating the impact of market, technology, and policy uncertainties upon transmission planning on a regional and multi-decadal time scale. The methodology will integrate transmission capacity expansion decisions and OPF methodologies in a decomposition scheme in order to rigorously capture operational constraints such as security constraints, ramp limitations, and transmission flow limits, as well as longer term investment issues. The methodology would address questions such

90

Incorporating Variable Generation and Controllable Loads into Risk-Based Transmission Planning  

Science Conference Proceedings (OSTI)

As the penetration and size of renewable generation resources increase, transmission infrastructure must be expanded to accommodate increasing renewable resource output. Conventional transmission expansion planning requires sufficient transmission capacities to transfer the full name-plate capacity of all power plants at the same time to load centers. However, renewable resources, such as wind and solar, have highly variable output and are spatially diversified. Thus, transmission expansion planning with...

2010-12-31T23:59:59.000Z

91

Relationships of Light Transmission, Stratification and Fluorescence in the Hypoxic Region of the Texas-Louisiana Shelf in Spring/Summer 2009  

E-Print Network (OSTI)

The growth of phytoplankton in hypoxic waters requires nutrients and light. In river plumes of the coastal ocean, river borne surface nutrient concentrations decrease with distance from the river mouth. Light availability at the surface also changes with distance from the river source, as particulates and other materials sink through the water column. Using in situ CTD sensors, water samples of nutrients, and ship flow-through data from two Louisiana Shelf research cruises, April and July 2009, the relationship between transmissivity, photosynthetically available radiation (PAR), stratification, and fluorescence are analyzed. PAR is measured using a silicon photovoltaic detector and is measured in the 400 to 700 nm range. A fluorometer is used to measure the fluorescence of chlorophyll a in g/L and is a proxy indicator for phytoplankton biomass. The Louisiana Shelf is home to the largest hypoxic zone in the western hemisphere, covering on average more than 15000 sq. km. The Louisiana hypoxic zone occurs seasonally in summer and is typically dissipated by physical processes in fall. Hypoxia is defined as waters that have a dissolved oxygen concentration of 1.4 ml/L and is the level at which marine organisms are typically adversely affected. Preliminary results show expected relationships between transmissivity and fluorescence in the water column indicating a positive correlation between light availability and fluorescence. The spatial distribution of stratification, light availability, fluorescence, and nutrients are compared for the different seasons.

Towns, Jenny L

2010-05-01T23:59:59.000Z

92

2009 National Electric Transmission Congestion Study - Hartford...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hartford Workshop 2009 National Electric Transmission Congestion Study - Hartford Workshop On July 9, 2008, DOE hosted a regional pre-study workshop in Hartford, CT to receive...

93

2012 National Electric Transmission Congestion Study - Philadelphia...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Philadelphia Workshop 2012 National Electric Transmission Congestion Study - Philadelphia Workshop On December 6, 2011, DOE hosted a regional pre-study workshop in Philadelphia, PA...

94

ESSAYS IN FINANCIAL TRANSMISSION RIGHTS PRICING.  

E-Print Network (OSTI)

??This work examines issues in the pricing of financial transmission rights in the PJM market region. The US federal government is advocating the creation of… (more)

Posner, Barry

2006-01-01T23:59:59.000Z

95

2009 National Electric Transmission Congestion Study - Oklahoma...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Oklahoma City Workshop 2009 National Electric Transmission Congestion Study - Oklahoma City Workshop On June 18, 2008, DOE hosted a regional pre-study workshop in Oklahoma City,...

96

Model documentation: Natural gas transmission and distribution model of the National Energy Modeling System. Volume 1  

SciTech Connect

The Natural Gas Transmission and Distribution Model (NGTDM) is the component of the National Energy Modeling System (NEMS) that is used to represent the domestic natural gas transmission and distribution system. NEMS was developed in the Office of integrated Analysis and Forecasting of the Energy information Administration (EIA). NEMS is the third in a series of computer-based, midterm energy modeling systems used since 1974 by the EIA and its predecessor, the Federal Energy Administration, to analyze domestic energy-economy markets and develop projections. The NGTDM is the model within the NEMS that represents the transmission, distribution, and pricing of natural gas. The model also includes representations of the end-use demand for natural gas, the production of domestic natural gas, and the availability of natural gas traded on the international market based on information received from other NEMS models. The NGTDM determines the flow of natural gas in an aggregate, domestic pipeline network, connecting domestic and foreign supply regions with 12 demand regions. The methodology employed allows the analysis of impacts of regional capacity constraints in the interstate natural gas pipeline network and the identification of pipeline capacity expansion requirements. There is an explicit representation of core and noncore markets for natural gas transmission and distribution services, and the key components of pipeline tariffs are represented in a pricing algorithm. Natural gas pricing and flow patterns are derived by obtaining a market equilibrium across the three main elements of the natural gas market: the supply element, the demand element, and the transmission and distribution network that links them. The NGTDM consists of four modules: the Annual Flow Module, the Capacity F-expansion Module, the Pipeline Tariff Module, and the Distributor Tariff Module. A model abstract is provided in Appendix A.

NONE

1995-02-17T23:59:59.000Z

97

Transmission A  

Gasoline and Diesel Fuel Update (EIA)

decreases decreases were related to decreases in electric utility con- sumption in each State and by decreased industrial con- sumption in each of the States except New York. However, all of the States reported significantly increased residential and commercial consumption. In general, increased inter- state movements up the eastern seaboard States helped to meet the overall increased total demand in the middle At- lantic and New England areas. Imports and Exports In 1996, net imports of natural gas rose for the 10th consecutive year, representing almost 13 percent of U.S. gas consumption. Exports remained at nearly the same level as one year ago. Canada continued its role as the major supplier of gas imported into the United States. However, the growth rate of U.S. imports of Canadian gas slowed as pipeline capacity utilization remained near its maximum level and capacity expansion

98

Airspace: Antarctic Sound Transmission  

E-Print Network (OSTI)

Antarctic Sound Transmission Andrea Polli Director,investigates how sound transmission can contribute to thePoles. How have such transmission-based projects developed

Polli, Andrea

2009-01-01T23:59:59.000Z

99

Transmission Investment: A Primer  

SciTech Connect

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

100

Characterization of carbon fibers: coefficient of thermal expansion and microstructure  

E-Print Network (OSTI)

The focus of the research is to develop a consistent and repeatable method to evaluate the coefficient of thermal expansion (CTE) of carbon fibers at high temperatures. Accurate measurement of the CTE of carbon fibers is essential to understand and develop optimal processing procedures as well as computational simulations to predict properties and allowables for fiber-reinforced composites. The mismatch between the coefficient of thermal expansion of the fiber and the matrix has a profound impact on the development of residual stresses and the subsequent damage initiation and progression, potentially diminishing the performance of composite structures. In situ transmission electron microscopy (TEM) is selected to perform the experimental work on account of the high resolution and the capability of evaluating both the longitudinal and transverse CTE. The orthotropy in the CTE is tested by rotating the fibers through 45° about their axis. The method is validated by testing standard tungsten filaments of known CTE. Additionally, the microstructure of the fibers is studied in a field emission scanning electron microscope as well as through selected area diffraction patterns in a TEM to observe presence of any potential orthotropy. The pitch based P55 fiber revealed a cylindrically orthotropic microstructure, but the PAN based IM7 and T1000 fibers did not reveal any orthotropy. Finite element models of hexagonally arranged IM7 fibers in a 977 epoxy matrix are developed using PATRAN and analyzed using the commercial FEA code ABAQUS 6.4. The fiber properties were considered temperature independent where as the matrix properties were varied linearly with temperature. The lamina properties evaluated from the finite element modeling are in agreement with the experimental results in literature within 10% in the temperature range of room temperature to the stress free temperature of the epoxy, however at cryogenic temperatures the difference is greater. The residual stresses developed during processing of the composite indicated a potential location for fiber matrix debonding to be in the matrix dominant regions.

Kulkarni, Raghav Shrikant

2004-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Hydromechanical transmission  

DOE Patents (OSTI)

A power transmission having three planetary assemblies, each having its own carrier and its own planet, sun, and ring gears. A speed-varying module is connected in driving relation to the input shaft and in driving relationship to the three sun gears, all of which are connected together. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being connected in driving relation to the input shaft, the other unit, which may have a fixed stroke, being connected in driving relation to the sun gears. The input shaft also drives the carrier of the third planetary assembly. A brake grounds the first carrier in the first range and in reverse and causes drive to be delivered to the output through the first ring gear in a hydrostatic mode. The carrier of the third planetary assembly drives the ring gear of the second planetary assembly, and a first clutching means connects the second carrier with the output in a second range, the brake for grounding the first carrier then being released. A second clutching means enables the third ring gear to drive the output shaft in a third range.

Orshansky, Jr. deceased, Elias (LATE OF San Francisco, CA); Weseloh, William E. (San Diego, CA)

1978-01-01T23:59:59.000Z

102

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

103

NWCC Transmission Case Study III  

DOE Green Energy (OSTI)

OAK-B135 Transmission System Improvements for Wind Energy Development in the Upper Midwest and Great Plains: Opportunities and Obstacles. This case study set out to ascertain the validity of three assumptions from the perspectives of stakeholders involved in wind energy and transmission issues in the Upper Midwest and Great Plains. The assumptions, and the stakeholders' reactions to each, are summarized below: Assumption 1--Transmission system improvements would provide significant benefits to the electricity network and its customers. Respondents acknowledge the potential for overall system benefits in the form of reduced line losses, improved grid stability and reliability, and enhanced ability to conduct spot market transactions. They also agree that these benefits relate to specific regional needs. However, there is disagreement over the extent of other benefits such as efficiency gains and cost savings from reduced line losses. Further, environmental and community interest groups point out that none of these benefits are realized without significant financial, environmental and social costs. Assumption 2--The benefits of transmission improvements would be helpful, but not confined, to wind power. All respondents agree that wind energy could benefit from transmission system improvements. But they also acknowledge, reluctantly, in the case of environmental stakeholders, that the benefits of an improved transmission system cannot be limited to environmentally preferable forms of generation. Some environmental and community advocate respondents also feel that transmission system improvement projects can be avoided altogether through energy conservation and efficiency measures, and by substituting wind energy for fossil generation. Assumption 3--Transmission alliances among stakeholders within and external to the wind community can provide benefits in the public interest. The fractured, multi-jurisdictional governance of the regional transmission system, and the distrust and diversity of perspectives among affected stakeholders, may make the formation of multi-stakeholder alliances necessary to accomplishing transmission goals. If the wind industry and utilities want to partner with environmental and community advocate groups in supporting a transmission project, they may have to convince these groups that the project would result in a net environmental benefit. The project proponents would have to make the case that the benefits of the additional wind energy will at least offset the emissions of any additional fossil generation made possible by the transmission project, as well as offset the environmental impact of the transmission project itself.

Terry Allison, Steve Wiese

2000-03-01T23:59:59.000Z

104

Expansion Capital Partners LLC | Open Energy Information  

Open Energy Info (EERE)

Expansion Capital Partners LLC Expansion Capital Partners LLC Jump to: navigation, search Name Expansion Capital Partners LLC Address One Embarcadero Center, Suite 4100 Place San Francisco, California Zip 94111 Region Bay Area Product Venture capital firm that invests in expansion-stage, clean technology enterprises Year founded 2001 Phone number (415) 788-8802 Website http://www.expansioncapital.co Coordinates 37.794497°, -122.39962° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.794497,"lon":-122.39962,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

105

Hydro Aluminium Sunndal Expansion Project  

Science Conference Proceedings (OSTI)

Apr 1, 2003 ... Hydro Aluminium Sunndal Expansion Project ... very competitive, and it is the prerequisite for the present project, both in terms of cost efficiency ...

106

Zambia-Long-Term Generation Expansion Study | Open Energy Information  

Open Energy Info (EERE)

Zambia-Long-Term Generation Expansion Study Zambia-Long-Term Generation Expansion Study Jump to: navigation, search Logo: Zambia-Long-Term Generation Expansion Study Name Zambia-Long-Term Generation Expansion Study Agency/Company /Organization Argonne National Laboratory Sector Energy Topics Implementation, GHG inventory, Background analysis Resource Type Software/modeling tools, Lessons learned/best practices Website http://www.dis.anl.gov/pubs/61 Country Zambia UN Region Eastern Africa References Zambia-Long-Term Generation Expansion Study[1] Abstract The objective of this study is to analyze possible long-term development options of the Zambian electric power system in the period up to 2015. Overview "The objective of this study is to analyze possible long-term development options of the Zambian electric power system in the period up to 2015. The

107

2009 National Electric Transmission Congestion Study - Atlanta Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 National Electric Transmission Congestion Study - Atlanta 2009 National Electric Transmission Congestion Study - Atlanta Workshop 2009 National Electric Transmission Congestion Study - Atlanta Workshop On July 29, 2008, DOE hosted a regional pre-study workshop in Atlanta, GA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda and full transcript are available below. 7-29-08 Congestion Workshop Agenda - Atlanta, GA.pdf Transcript - 2009 National Electric Transmission Congestion Study Atlanta Workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2012 National Electric Transmission Congestion Study - St. Louis Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop

108

Accounting-related transmission issues  

Science Conference Proceedings (OSTI)

Various initiatives have been undertaken by the Federal Energy Regulatory Commission (FERC) to deregulate wholesale electric energy markets. These initiatives have focused on restructuring the transmission systems in the US and recently have culminated in a proposal requiring formation of and participation in regional transmission organizations. The overall form of regulation selected to determine rates for transmission entities as well as underlying regulatory decisions reached on key issues will have profound implications for transmission entities. For example, traditional cost-based regulation would require one set of accounting and reporting rules, while incentive-based regulation may not be subject to those same rules. An overview of some of the major accounting and financial reporting issues that will need to be considered is presented.

Niehaus, M.; Bjorn, P.; Pate, G.

1999-12-01T23:59:59.000Z

109

Midwest Transmission Workshop III Summary  

DOE Green Energy (OSTI)

OAK-B135 On March 12-13, 2002, the National Wind Coordinating Committee (NWCC), in cooperation with regional stakeholders, held a two-day workshop: Planning for Electrical Transmission Needs in the Upper Midwest. The workshop was the outgrowth of an effort to develop a forum and process for consideration of transmission options that strives for equitable allocation of benefits and impacts among all affected parties. The goal of this workshop was to provide a catalyst for an enhanced, inclusive process for transmission planning with participation of and acceptance by all affected stakeholders. Participants in the meeting included representatives of state and regional regulatory agencies, utilities and power generators, the wind industry, environmental and landowner interests, and other interested parties (see Attachment A for a list of meeting participants).

Kevin Bryan

2003-03-12T23:59:59.000Z

110

Boundary stabilization of transmission problems  

E-Print Network (OSTI)

We study the transmission problem in bounded domains with dissipative boundary conditions. Under some natural assumptions, we prove uniform bounds of the corresponding resolvents on the real axis at high frequency, and as a consequence, we obtain free of eigenvalues regions. As an application, we get exponential decay of the energy of the solutions of the correpsonding mixed boundary value problems.

Fernando Cardoso; Georgi Vodev

2009-10-20T23:59:59.000Z

111

Regulations for Electric Transmission and Fuel Gas Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long...

112

DOE Transmission Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Workshop November 1, 2012 Federal Energy Regulatory Commission Commissioner Cheryl LaFleur 1 FERC's Transmission Efforts Reliability and Grid Security Planning...

113

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Usage Transmission Transmission Once electricity is generated -- whether by burning fossil fuels; through nuclear fission; or by harnessing wind, solar, geothermal, or hydro...

114

Merchant transmission investment  

E-Print Network (OSTI)

We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

Joskow, Paul L.

2003-01-01T23:59:59.000Z

115

Microsoft Word - CX_DeMoss_Substation_Expansion_130531  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaric Hsu Alaric Hsu Project Manager - TEP-CSB-2 Proposed Action: De Moss Substation Expansion Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Sherman County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to expand its De Moss Substation yard located in Sherman County, Oregon. The expansion is necessary to install additional reactors that would provide the necessary reactive support to address the extreme high voltage at De Moss Substation resulting from the loss of the Big Eddy - DeMoss transmission line during winter peak conditions. The equipment at De Moss Substation is currently sustaining voltage

116

Design of resource to backbone transmission for a high wind penetration future.  

E-Print Network (OSTI)

??In a high wind penetration future, transmission must be designed to integrate groups of new wind farms with a high capacity inter-regional ``backbone" transmission system.… (more)

Slegers, James Michael

2013-01-01T23:59:59.000Z

117

Cellular/Molecular Connexin35 Mediates Electrical Transmission at Mixed  

E-Print Network (OSTI)

Cellular/Molecular Connexin35 Mediates Electrical Transmission at Mixed Synapses on Mauthner Cells regions, suggesting that connexin35-mediated electrical transmission is common in goldfish brain" (electrical and chemical) synaptic terminals that offer the unique opportunity to correlate physiological

Rash, John E.

118

WECC 10-Year Plan general presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bradley Nickell Director of Transmission Planning Regional Transmission Expansion Planning (RTEP) DOE EAC Meeting October 20, 2011 2 Regional Transmission Expansion Planning What...

119

Crossroads Expansion | Open Energy Information  

Open Energy Info (EERE)

Expansion Expansion Jump to: navigation, search Name Crossroads Expansion Facility Crossroads Expansion Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Oklahoma Gas & Electric Developer RES Americas Energy Purchaser Oklahoma Gas & Electric Coordinates 36.021°, -98.667° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.021,"lon":-98.667,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

120

Job Expansion Tax Credit (Connecticut)  

Energy.gov (U.S. Department of Energy (DOE))

The Job Expansion Tax Credit allows eligible businesses to receive tax credits for each new full-time position created. Up to $500 per month per employee is available for up to three years. The...

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Beyond Adiabatic Elimination: Systematic Expansions  

E-Print Network (OSTI)

We restate the adiabatic elimination approximation as the first term in a singular perturbation expansion. We use the invariant manifold formalism for singular perturbations in dynamical systems to identify systematic improvements on adiabatic elimination, connecting with well established quantum mechanical perturbation methods. We prove convergence of the expansions when energy scales are well separated. We state and solve the problem of hermiticity of improved effective hamiltonians.

I. L. Egusquiza

2013-09-03T23:59:59.000Z

122

Environmental Assessment for the Terminal Expansion Project.  

SciTech Connect

The Terminal Expansion Project is proposed by Bonneville Power Administration (BPA), Southern California Edison (SCE), and the Los Angeles Department of Water and Power (LADWP) to increase the operating capacity of the existing bipole direct current (dc) Intertie line between the Celilo Converter Station at The Dalles, Oregon, and the Sylmar converter Station at Sylmar, California. The proposal will allow a greater exchange of electric power between the Pacific Northwest (PNW) and Southern California without constructing new interregional transmission lines. By adding more alternating ac/dc converter equipment at the terminals, the conductors on the existing 845-mile dc intertie transmission line can be operated at full design capacity. The dc Intertie plus two other ac lines which terminate near San Francisco comprise the ''Intertie.'' Though the project is interregional, relatively little construction will be needed. This Environmental Assessment addresses the environmental impacts of the proposed actions and makes a determination as to their significance. Though LADWP is complying with the State environmental process, as required by the California Environmental Quality Act (CEQA), the impacts of their construction are being considered as part of the impacts of the overall proposal and are considered in the determination of significance.

United States. Bonneville Power Administration.

1985-02-01T23:59:59.000Z

123

Independent transmission company (ITC) and markets for transmission  

E-Print Network (OSTI)

Independent Abstract-- transmission company (ITC) and markets for transmission Yong T. Yoon Marija a fundamental structure for the transmission provider (TP) composed of the independent transmission company (ITC out the associated functions including managing transmission congestion. At the minimum

Ilic, Marija D.

124

Development of Low Thermal Expansion Superalloys  

Science Conference Proceedings (OSTI)

For heat resistant alloys it is useful to decrease the thermal expansion for improved adherance of low thermal expansion ceramic coatings like silicon nitride,.

125

Cosmic Growth History and Expansion History  

E-Print Network (OSTI)

LBNL- 58260 Cosmic Growth History andExpansion History Eric V. Linder Physics Division, LawrenceCalifornia. Cosmic Growth History and Expansion History Eric

Linder, Eric V.

2009-01-01T23:59:59.000Z

126

Three essays concerning information transmission  

E-Print Network (OSTI)

Transmissionas an Information-Transmission Mechanism,” American EconomicConcerning Information Transmission A dissertation submitted

Boone, Johnathan

2010-01-01T23:59:59.000Z

127

Characterization of Planar Transmission Lines  

Science Conference Proceedings (OSTI)

... References on: On-Wafer Measurement and Calibration, Planar Transmission Line Characterization and Multiconductor Transmission Lines. ...

2011-12-15T23:59:59.000Z

128

San Luis Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

129

Bulk Power Transmission Study  

E-Print Network (OSTI)

"Texans now have a choice. We can become more efficient and maintain our standard of living, or we can continue business as usual and watch our standard of living erode from competition from other regions. In the past, except for improving reliability, there was no need for a strong transmission system. When Texas generation was primarily gas fueled, the extensive natural gas pipeline network moved energy easily within the state. In recent years two things have changed: 1. Electric utilities have made extensive investment in lignite, coal, and nuclear plants and, 2. Improvements in gas turbine technology and the removal of institutional barriers has encouraged cogeneration at many of our energy intensive process industries. This energy diversity means that there are now significant differences in energy costs between units. The variable costs of generation of power can vary between units by a ratio of 2 or 3 to 1 and this difference will be accentuated when energy costs rise (and they will; it’s a question of when, not if). The potential for costs savings by optional dispatching of the entire interconnected system are greater than ever before as demonstrated by the PUC's Bulk Power Transmission Study. And the potential can be enhanced with added transmission system investment. Cogeneration and small power production has proven to be the most cost effective way for Texas to add additional generating capacity needed to supply an economy that is starting to rebound and to replace old, obsolete power plants. The freedom to locate these facilities at the fuel source or at the site of large thermal demand makes real economic and environmental sense. The use of renewable or waste fuels allows something that would otherwise be wasted to contribute to our economy. Fossil fuels that are displaced can be redirected to another use or consumed for future benefit. By integrating a gas turbine generator with a. process plant, the natural gas required for producing electricity can be reduced by 40% below that required for a combined cycle. The heat rejected from a gas turbine, combined cycle, or steam plant can be redirected to a process use that contributes to our economy by producing something of value to world markets. By contrast a conventional power plant is paid for by the rate payers and consumes Texas natural resources and therefore is a burden rather than an enhancement to our economy. The optimal location of facilities are possible only if there is an adequate transmission system. Utility, consumer and industry must cooperate to improve our transmission system for the benefit of all Texas. The Texas Public Utilities Commission has taken the lead in promoting efficiency by requiring transmission wheeling between qualifying facilities and electric utilities. Several cogeneration facilities have been constructed as a result. In order to encourage small power production, the rule needs to be expanded to include projects interconnected with distribution systems. Most renewable resource projects are relatively small and cannot afford the cost of a high voltage interconnect, and yet their characteristics match a baseload need. The ability to wheel power to a utility that needs base load power from a distribution level interconnection is essential to development of these smaller projects."

John, T.

1988-09-01T23:59:59.000Z

130

New Mexico/Transmission | Open Energy Information  

Open Energy Info (EERE)

New Mexico/Transmission New Mexico/Transmission < New Mexico Jump to: navigation, search NewMexicoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in New Mexico is part of the Southwest Area Transmission power grid which is part of the WestConnect Transmission Planning area, and covers the desert southwest of the United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in New Mexico. In addition, WECC provides an environment for coordinating the operating and planning

131

Natural Gas Transmission and Distribution Model of the National Energy Modeling System. Volume 1  

Science Conference Proceedings (OSTI)

The Natural Gas Transmission and Distribution Model (NGTDM) is the component of the National Energy Modeling System (NEMS) that is used to represent the domestic natural gas transmission and distribution system. The NGTDM is the model within the NEMS that represents the transmission, distribution, and pricing of natural gas. The model also includes representations of the end-use demand for natural gas, the production of domestic natural gas, and the availability of natural gas traded on the international market based on information received from other NEMS models. The NGTDM determines the flow of natural gas in an aggregate, domestic pipeline network, connecting domestic and foreign supply regions with 12 demand regions. The purpose of this report is to provide a reference document for model analysts, users, and the public that defines the objectives of the model, describes its basic design, provides detail on the methodology employed, and describes the model inputs, outputs, and key assumptions. Subsequent chapters of this report provide: an overview of NGTDM; a description of the interface between the NEMS and NGTDM; an overview of the solution methodology of the NGTDM; the solution methodology for the Annual Flow Module; the solution methodology for the Distributor Tariff Module; the solution methodology for the Capacity Expansion Module; the solution methodology for the Pipeline Tariff Module; and a description of model assumptions, inputs, and outputs.

NONE

1998-01-01T23:59:59.000Z

132

Power transmission investment analysis: a new financial Evaluation framework for South Africa  

Science Conference Proceedings (OSTI)

A proposed framework for power transmission expansion projects in South Africa incorporates the modeling of project options and uncertainties, Monte Carlo simulations, real option analysis, and decision analysis, based on a foundation of strategic analysis. (author)

Maboke, Silky Ntombifuthi; Kachienga, Michael Ogembo

2008-05-15T23:59:59.000Z

133

Merchant and Regulated Transmission: Theory, Evidence and Policy  

E-Print Network (OSTI)

that are the basis of potential revenue. The pressures for transmission expansion and the option of merchant or private initiative investment are causing the Federal Energy Regulatory Commission (FERC) to reconsider its traditional open access transmission... policy. (FERC 2011a) EU regulators too, faced with ineffective unbundling and insufficient new interconnectors, are allowing incumbent transcos exemption from EC rules on third party access in order to encourage investment. De Hauteclocque and Rious...

Littlechild, Stephen

134

Modeling Interregional Transmission Congestion in the National Energy Modeling System  

E-Print Network (OSTI)

22 3.4 No Coal25 3.4.1 Coal Supply Regions and Electricity Market24 Figure 3-14 Economic Transmission in No Coal

Gumerman, Etan; Chan, Peter; Lesieutre, Bernard; Marnay, Chris; Wang, Juan

2006-01-01T23:59:59.000Z

135

National Transmission Grid Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

136

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

137

Arnold Schwarzenegger TRANSMISSION BENEFIT  

E-Print Network (OSTI)

California Edison's (SCE) initial Tehachapi transmission trunk-line proposal for integration of wind. The Tehachapi Transmission Project to integrate 4,500 MW of renewable wind energy has since been approved after

138

Transmission Investment Incentives  

Science Conference Proceedings (OSTI)

This report documents the use of agent-based simulation as a tool for studying transmission investment incentives, and it is meant to illuminate what accounts for the difficulties in aligning incentives for enhancing the transmission system. The report suggests that a new method of calculation for bid optimization be applied to the economic analysis of long-term incentives for transmission investment. This technology can be broadly applied to help negotiators in transmission planning quantify their count...

2006-12-21T23:59:59.000Z

139

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

cable transmission systems:5 two 500 kV circuits, a high-voltage direct current (HVDC) system and two to serve VI and the HVDC link is expected to be completely retired in 2007. This erosion in transmission / replacement of the HVDC cables (at a cost of $230 million), as well as transmission upgrades on the mainland

140

Automated manual transmission controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

1999-12-28T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

142

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

conventional power and wind power make transmission more300 MW or more of new wind power and focus on the deeperthe trend toward wind power’s inclusion in regional

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

143

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications 2013 Transmission Reliability Program Peer Review - Day 1...

144

Definition: Transmission Service Provider | Open Energy Information  

Open Energy Info (EERE)

Transmission Service Provider The entity that administers the transmission tariff and provides Transmission Service to Transmission Customers under applicable...

145

Transmission Management in the Aftermath of Electricity Restructuring in Turkey  

Science Conference Proceedings (OSTI)

In moving toward restructuring, transmission expansion planning is a major challenge. The authors offer a general perspective on TEP issues, then address the specific challenges in Turkey and propose several strategies toward managing physical and financial risks in that country. (author)

Tor, Osman Bulent; Shahidehpour, Mohammad

2006-08-15T23:59:59.000Z

146

Microsoft Word - PearlSubExpansion_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2012 3, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Johny Luiz - TEP-CSB-2 Proposed Action: Pearl Substation 500-kilovolt (kV) #6 Bay Addition Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Clackamas County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The proposed project includes modification of existing substation equipment, the addition of a new 500-kV Bay 6, and a one-half acre yard expansion in the southwest corner of the substation. The yard expansion area is within BPA property, consists of mowed grass, and is to facilitate a 40 square foot addition to the Pearl Control House

147

Adaptive control of hydraulic shift actuation in an automatic transmission  

E-Print Network (OSTI)

A low-order dynamic model of a clutch for hydraulic control in an automatic transmission is developed by separating dynamics of the shift into four regions based on clutch piston position. The first three regions of the ...

Thornton, Sarah Marie

2013-01-01T23:59:59.000Z

148

Energy Transmission and Infrastructure  

SciTech Connect

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

149

Heat kernel expansion: user's manual  

E-Print Network (OSTI)

The heat kernel expansion is a very convenient tool for studying one-loop divergences, anomalies and various asymptotics of the effective action. The aim of this report is to collect useful information on the heat kernel coefficients scattered in mathematical and physical literature. We present explicit expressions for these coefficients on manifolds with and without boundaries, subject to local and non-local boundary conditions, in the presence of various types of singularities (e.g., domain walls). In each case the heat kernel coefficients are given in terms of several geometric invariants. These invariants are derived for scalar and spinor theories with various interactions, Yang-Mills fields, gravity, and open bosonic strings. We discuss the relations between the heat kernel coefficients and quantum anomalies, corresponding anomalous actions, and covariant perturbation expansions of the effective action (both "low-" and "high-energy" ones).

D. V. Vassilevich

2003-06-15T23:59:59.000Z

150

Transmission planning in the era of integrated resource planning: A survey of recent cases  

SciTech Connect

State action is critical to the expansion of the high-voltage transmission network, because regulated utilities must seek approval from utility commissions for proposals to site new lines. It is the purpose of this report to survey the regulatory treatment of issues that are unique to or ubiquitous in transmission planning and use. The authors review recent transmission siting cases to examine how the issues are presented to and resolved by state regulatory commissions and to provide a perspective for more general discussion of transmission policy. Their primary focus is on planning issues. Transmission capacity expansion is not typically treated in integrated resource planning. It is usually assumed that there is adequate transmission to achieve any particular plan. The authors believe that one important reason for this omission is the inherent complexity of transmission system expansion. Regulators and competitors may be at a serious disadvantage in negotiating or adjudicating specific transmission proposals with utilities, who generally have greater knowledge of both general technological considerations and case specifics. This problem of asymmetric information must be addressed at some level in planning or dispute resolution. However, they observe that explicit consideration of the information problem is absent from most regulatory and technical analysis of transmission. The goal of this survey is to share knowledge about the problems facing state regulators over the siting of new transmission facilities, and help to define constructive approaches to them.

Baldick, R.; Kahn, E.P.

1992-09-01T23:59:59.000Z

151

Series Transmission Line Transformer  

DOE Patents (OSTI)

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

152

Feasibility of wavelet expansion methods to treat the energy variable  

Science Conference Proceedings (OSTI)

This paper discusses the use of the Discrete Wavelet Transform (DWT) to implement a functional expansion of the energy variable in neutron transport. The motivation of the work is to investigate the possibility of adapting the expansion level of the neutron flux in a material region to the complexity of the cross section in that region. If such an adaptive treatment is possible, 'simple' material regions (e.g., moderator regions) require little effort, while a detailed treatment is used for 'complex' regions (e.g., fuel regions). Our investigations show that in fact adaptivity cannot be achieved. The most fundamental reason is that in a multi-region system, the energy dependence of the cross section in a material region does not imply that the neutron flux in that region has a similar energy dependence. If it is chosen to sacrifice adaptivity, then the DWT method can be very accurate, but the complexity of such a method is higher than that of an equivalent hyper-fine group calculation. The conclusion is thus that, unfortunately, the DWT approach is not very practical. (authors)

Van Rooijen, W. F. G. [Research Inst. of Nuclear Engineering, Univ. of Fukui, Kanawa-cho 1-2-4, 914-0055, Fukui-ken, Tsuruga-shi (Japan)

2012-07-01T23:59:59.000Z

153

Video Transmission Jerkiness Measure.  

E-Print Network (OSTI)

??Digital video transmission is widely used nowadays in multimedia. Frame dropping, freeze and reduced number of frames in the transmitted video are common symptoms of… (more)

Abdelsamad, Deena

2013-01-01T23:59:59.000Z

154

NIST Transmission SEM  

Science Conference Proceedings (OSTI)

... As a result, more electrons will scatter, to provide the ... RR Keller, "Transmission EBSD in the Scanning Electron Microscope," Microscopy Today vol. ...

2013-07-29T23:59:59.000Z

155

Patterns of transmission investment  

E-Print Network (OSTI)

This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

Joskow, Paul L.

2005-01-01T23:59:59.000Z

156

Quantum Indeterminacy in Local Measurement of Cosmic Expansion  

E-Print Network (OSTI)

For a system of two small bodies in an expanding universe, bounds on mass and separation are estimated, from standard gravity and quantum mechanics, such that both their gravity and the process of quantum measurement affect their motion less than the cosmic expansion does. It is shown that such a direct local measurement of cosmic expansion or acceleration at rate $H$ is only possible, even in principle, in a region of size greater than $H^{-3/5}$ in Planck units, or about 60 meters in the current universe, a new scale that defines a boundary between quantum and classical expansion. A generalization to spatially extended linear density perturbations shows the same scale. Matching vacuum energy or directional information in localized field states to gravity on this system length scale yields a particle mass scale of $H^{3/10}$, or about 7 GeV today. Possible connections of cosmic acceleration with the QCD vacuum are discussed.

Craig J. Hogan

2013-12-30T23:59:59.000Z

157

Quantum indeterminacy in local measurement of cosmic expansion  

E-Print Network (OSTI)

For a system of two small bodies in an expanding universe, bounds on mass and separation are estimated, from standard gravity and quantum mechanics, such that both their gravity and the process of quantum measurement affect their motion less than the cosmic expansion does. It is shown that such a direct local measurement of cosmic expansion or acceleration at rate $H$ is only possible, even in principle, in a region of size greater than $H^{-3/5}$ in Planck units, or about 60 meters in the current universe, a new scale that defines a boundary between quantum and classical expansion. A generalization to spatially extended linear density perturbations shows the same scale. Matching vacuum energy or directional information in localized field states to gravity on this system length scale yields a particle mass scale of $H^{3/10}$, or about 7 GeV today. Possible connections of cosmic acceleration with the QCD vacuum are discussed.

Hogan, Craig J

2013-01-01T23:59:59.000Z

158

Query expansion techniques for question answering  

E-Print Network (OSTI)

Query expansion is a technique used to boost performance of a document retrieval engine, such as those commonly found in question answering (QA) systems. Common methods of query expansion for Boolean keyword-based document ...

Bilotti, Matthew W. (Matthew William), 1981-

2004-01-01T23:59:59.000Z

159

Capacity expansion in contemporary telecommunication networks  

E-Print Network (OSTI)

We study three capacity expansion problems in contemporary long distance telecommunication networks. The first two problems, motivated by a major long distance provider, address capacity expansion in national hybrid long ...

Sivaraman, Raghavendran

2007-01-01T23:59:59.000Z

160

Cluster Expansion Methods - Progress and Outlook  

Science Conference Proceedings (OSTI)

Symposium, Computational Thermodynamics and Kinetics. Presentation Title, Cluster Expansion Methods - Progress and Outlook. Author(s), Axel van de Walle .

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Expansion and Collapse of Liquid Aluminum Foams  

Science Conference Proceedings (OSTI)

ESP Dust Recovery Process Test Works, Plant Trial, Commissioning, Operations and Metallurgical Performance · Expansion and Collapse of Liquid Aluminum ...

162

Constraints on the Origin of Paleolake Expansions in the Central Andes  

Science Conference Proceedings (OSTI)

During the late Pleistocene, at least one episode of lake expansions occurred in the internally draining high plateau region of Bolivia. Some researchers have advocated that a wetter climate associated with a change in atmospheric circulation ...

Troy A. Blodgett; Bryan L. Isacks; John D. Lenters

1997-01-01T23:59:59.000Z

163

The progressive transmission disadvantage  

Science Conference Proceedings (OSTI)

The disadvantage of progressive transmission, compared to transmission in a single step, is analyzed for the high-rate case using a polytope that is self-similar under binary subdivision. This disadvantage is calculated to be 0.3424 dB or 0.057 bit compared ...

M. J. Durst

1997-01-01T23:59:59.000Z

164

Nonlinear magnetoinductive transmission lines  

E-Print Network (OSTI)

Power transmission in one-dimensional nonlinear magnetic metamaterials driven at one end is investigated numerically and analytically in a wide frequency range. The nonlinear magnetic metamaterials are composed of varactor-loaded split-ring resonators which are coupled magnetically through their mutual inductances, forming thus a magnetoiductive transmission line. In the linear limit, significant power transmission along the array only appears for frequencies inside the linear magnetoinductive wave band. We present analytical, closed form solutions for the magnetoinductive waves transmitting the power in this regime, and their discrete frequency dispersion. When nonlinearity is important, more frequency bands with significant power transmission along the array may appear. In the equivalent circuit picture, the nonlinear magnetoiductive transmission line driven at one end by a relatively weak electromotive force, can be modeled by coupled resistive-inductive-capacitive (RLC) circuits with voltage-dependent cap...

Lazarides, Nikos; Tsironis, G P

2011-01-01T23:59:59.000Z

165

FOR ELECTRIC POWER TRANSMISSION  

E-Print Network (OSTI)

A contract network extends the concept of a contract path to address the problem of loop flow and congestion in electric power transmission systems. A contract network option provides a well defined, internally consistent framework for assigning long-term capacity rights to a complicated electric transmission network. The contract network respects the special conditions induced by Kirchoff's Laws; accommodates thermal, voltage and contingency constraints on transmission capacity; and can be adopted without disturbing existing methods for achieving an economic power dispatch subject to these constraints. By design, a contract network would maintain short-run efficiency through optimal spot price determination of transmission prices. Through payment of congestion rentals, the contract network makes a long-term capacityright holder indifferent between delivery of the power or receipt of payments in a settlement system. And the contract network framework can support allocation of transmission capacity rights through a competitive bidding process. CONTRACT NETWORKS

William W. Hogan; William W. Hogan

1990-01-01T23:59:59.000Z

166

10 Year Transmission Plan for the Western Electricity Interconnection  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 Year Transmission Plan for the Western Electricity 10 Year Transmission Plan for the Western Electricity Interconnection Released 10 Year Transmission Plan for the Western Electricity Interconnection Released October 3, 2011 - 8:11am Addthis Western Electricity Coordinating Council releases its first-ever transmission plan for the Western Interconnection. The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection. The Office of Electricity Delivery and Energy Reliability awarded WECC a $14.5 million grant under the American Recovery and Reinvestment Act to expand on its transmission planning activities. Looking ahead to 2020, the Plan focuses on how to meet the Western Interconnection's transmission requirements, including transmission

167

2009 National Electric Transmission Congestion Study - Las Vegas Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 National Electric Transmission Congestion Study - Las Vegas 2009 National Electric Transmission Congestion Study - Las Vegas Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop On August 6, 2008, DOE hosted a regional pre-study workshop in Las Vegas, NV to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda and full transcript available below. 8-06-08 Congestion Workshop Agenda - Las Vegas, NV.pdf Transcript - 2009 National Electric Transmission Congestion Study Las Vegas Workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2009 National Electric Transmission Congestion Study - Chicago Workshop 2012 National Electric Transmission Congestion Study - San Diego Workshop

168

NWCC Transmission Case Study Conclusions Summary  

DOE Green Energy (OSTI)

OAK-B135 The NWCC Transmission Case Studies Conclusions Summary In the spring of 1999, the Utility Wind Interest Group (UWIG), with the cooperation of the National Wind Coordinating Committee (NWCC), conducted a forum on transmission issues associated with the production of energy from wind. As a result of this forum, a number of issues were identified which, if successfully resolved, could help reduce barriers to the future expansion of wind power. The NWCC, being a multi-stakeholder group, was in an ideal position to conduct follow-up activities among a cross-section of the interested parties. The follow-up activities took the form of three case studies in the areas of interest identified by forum participants: (1) Transmission policy and pricing; (2) ''Virtual wheeling'' arrangements; and, (3) Transmission system improvements. The case studies provide an interesting snapshot in time dealing with a range of issues associated with scheduled or planned regulatory and restructuring proceedings related to energy transmission. The NWCC Transmission Subcommittee and the UWIG reviewed early drafts of the case studies in November 1999. The case studies were conducted through a questionnaire and interview process with interested parties. In writing each case study, NWCC staff attempted to identify all stakeholder groups with an interest in each topic and solicit their input. While all parties do not agree on every issue presented, a serious effort has been made to present all views in an unbiased fashion. At the end of each case study, relevant conclusions are drawn and recommendations for next steps are provided where appropriate.

Steve Wiese, Terry Allison

2000-09-01T23:59:59.000Z

169

Expansion of high pressure gas into air - A more realistic blast wave model  

Science Conference Proceedings (OSTI)

In this paper, we consider a more realistic model of a spherical blast wave of moderate strength. An arbitrary number of terms for the series solution in each of the regions behind the main shock-the expansion region, the nearly uniform region outside ... Keywords: Blast wave, Compressible flow, Explosion, Gas dynamics, Shock wave

Ejanul Haque; Philip Broadbridge; P. L. Sachdev

2009-12-01T23:59:59.000Z

170

Down hole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

2007-07-24T23:59:59.000Z

171

Electric Transmission Lines (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

172

Transmission Electron Microscopy (TEM)  

Science Conference Proceedings (OSTI)

...Transmission electron microcopy (TEM) has been used since the 1950s to obtain very high resolution images of microstructures. As TEMs were enhanced to include features such as digitally scanned point beams and energy dispersive x-ray detectors

173

Designing electricity transmission auctions  

E-Print Network (OSTI)

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

174

Downhole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

2008-01-15T23:59:59.000Z

175

Cloud Transmissivities for Canada  

Science Conference Proceedings (OSTI)

Transmissivities are determined for different cloud types using nine years of hourly irradiance measurements under overcast skies at six Canadian stations. Values for individual stations and for pooled data using irradiances uncorrected for ...

J. A. Davies; M. Abdel-Wahab; J. E. Howard

1985-03-01T23:59:59.000Z

176

Transmission Line Grounding  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) published a comprehensive grounding report. Published in two parts, the report covered the theoretical and practical aspects of transmission line grounding practices. To further improve the tools available for grounding analysis, an investigation into practical ways to calculate the fault current distribution and ground potential rise of the transmission line grounding system was conducted. Furthermore, a survey of utilities has documented industry pr...

2011-12-23T23:59:59.000Z

177

Transmission Right Of Way  

NLE Websites -- All DOE Office Websites (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

178

Open Access Transmission Tariff  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

179

Assumptions to the Annual Energy Outlook - Natural Gas Transmission and  

Gasoline and Diesel Fuel Update (EIA)

Natural Gas Transmission and Distribution Module Natural Gas Transmission and Distribution Module Assumption to the Annual Energy Outlook Natural Gas Transmission and Distribution Module Figure 8. Natural Gas Transmission and Distribution Model Regions. Having problems, call our National Energy Information Center at 202-586-8800 for help. The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each forecast year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution

180

Renewable Energy Transmission Initiative Phase 1A  

E-Print Network (OSTI)

94597 Tel: (913) 458-2000 www.bv.com #12;Principal Investigators: Ryan Pletka, Project Manager Andy Potential in RETI Study region. ......... 6-23 Table 6-11. Candidate LFG Projects (3 MW and Greater information to be used in Phase 1B of the California Renewable Energy Transmission Initiative project. 1

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Definition: Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Jump to: navigation, search Dictionary.png Transmission An interconnected group of lines and associated equipment for the movement or transfer of electric energy...

182

Interconnection Transmission Planning: Awards | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and...

183

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

ColoradoTransmissionAgencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary...

184

Natural Gas Pipeline and System Expansions  

U.S. Energy Information Administration (EIA)

Energy Information Administration / Natural Gas Monthly April 1997 vii This special report examines recent expansions to the North American natural gas pipeline network

185

Cosmic Growth History and Expansion History  

E-Print Network (OSTI)

of the expansion history dark energy equation of state,and growth history constraints on the dark energy equationand growth history constraints on the dark energy equation

Linder, Eric V.

2009-01-01T23:59:59.000Z

186

Electric Power Generation Expansion in Deregulated Markets.  

E-Print Network (OSTI)

??The generation expansion problem involves increasing electric power generation capacity in an existing power network. In competitive environment, power producers, distributors, and consumers all make… (more)

KAYMAZ, PINAR

2007-01-01T23:59:59.000Z

187

Query expansion techniques for question answering.  

E-Print Network (OSTI)

??Query expansion is a technique used to boost performance of a document retrieval engine, such as those commonly found in question answering (QA) systems. Common… (more)

Bilotti, Matthew W. (Matthew William), 1981-

2004-01-01T23:59:59.000Z

188

Resonant Polarized Radiation Catalysis, and the Expansion  

Science Conference Proceedings (OSTI)

Presentation Title, The Birth of a New Field of Materials Science: Resonant Polarized Radiation Catalysis, and the Expansion of Thermodynamics. Author(s)  ...

189

Energy Infrastructure Events and Expansions Infrastructure Security...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Year-in-Review: 2010 Energy Infrastructure Events and Expansions Infrastructure Security and Energy Restoration Office of Electricity Delivery and Energy Reliability U.S....

190

Cyberspace Security Econometrics System (CSES) Expansion to ...  

In typical usage, analysts create matrices that capture their expert opinion, and then use those matrices to quantify costs to stakeholders. This expansion

191

Electricity Transmission, A Primer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

192

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

193

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

194

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

Science Conference Proceedings (OSTI)

The rapid development of wind power that the United States has experienced over the last several years has been coupled with a growing concern that wind development will require substantial additions to the nation's transmission infrastructure. Transmission is particularly important for wind power due to the locational dependence of wind resources, the relatively low capacity factor of wind plants, and the mismatch between the short lead time to build a new wind project and the longer lead time often needed to plan, permit, and construct transmission. It is clear that institutional issues related to transmission planning, siting, and cost allocation will pose major obstacles to accelerated wind power deployment, but also of concern is the potential cost of this infrastructure build out. Simply put, how much extra cost will society bear to deliver wind power to load centers? Without an answer to this question, there can be no consensus on whether or not the cost of developing transmission for wind will be a major barrier to further wind deployment, or whether the institutional barriers to transmission expansion are likely to be of more immediate concern. In this report, we review a sample of 40 detailed transmission studies that have included wind power. These studies cover a broad geographic area, and were completed from 2001-2008. Our primary goal in reviewing these studies is to develop a better understanding of the transmission costs needed to access growing quantities of wind generation. A secondary goal is to gain a better appreciation of the differences in transmission planning approaches in order to identify those methodologies that seem most able to estimate the incremental transmission costs associated with wind development. Finally, we hope that the resulting dataset and discussion might be used to inform the assumptions, methods, and results of higher-level assessment models that are sometimes used to estimate the cost of wind deployment (e.g. NEMS and WinDS). The authors and general location of the 40 detailed transmission studies included in our review are illustrated in Figure ES-1. As discussed in the body of the report, these studies vary considerably in scope, authorship, objectives, methodology, and tools. Though we recognize this diversity and are cognizant that comparisons among these studies are therefore somewhat inappropriate, we nonetheless emphasize such simple comparisons in this report. We do so in order to improve our understanding of the range of transmission costs needed to access greater quantities of wind, and to highlight some of the drivers of those costs. In so doing, we gloss over many important details and differences among the studies in our sample. In emphasizing simple comparisons, our analysis focuses primarily on the unit cost of transmission implied by each of the studies. The unit cost of transmission for wind in $/kW terms on a capacity-weighted basis is estimated by simply dividing the total transmission cost in a study by the total amount of incremental generation capacity (wind and non-wind) modeled in that study. In so doing, this metric assumes that within any individual study all incremental generation capacity imposes transmission costs in proportion to its nameplate capacity rating. The limitations to this approach are described in some detail in the body of the report.

Mills, Andrew D.; Wiser, Ryan; Porter, Kevin

2009-02-02T23:59:59.000Z

195

10-Yr. Transmission Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

196

Merchant Transmission Investment  

E-Print Network (OSTI)

merchant transmission model of the type described above, though Australia has adopted a mixed merchant and regu- 6 lated transmission model.3 However, recent academic proposals,4 as well as FERC’s July 2002 Standard Market Design (SMD) proposals, call... that a nodal or locational marginal pricing (LMP) system is in place with attributes similar to those being proposed by the U.S. Federal Energy Regulatory Commission (FERC) in its SMD proposals and to what is in operation in New 3Two merchant lines...

Joskow, Paul; Tirole, Jean

2004-06-16T23:59:59.000Z

197

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

198

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

199

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission lines between two adjacent periodic intersections to be longer than the other. 5 figs.

Ikezi, Hiroyuki; Lin-Liu, Yuh-Ren; deGrassie, J.S.

1990-03-02T23:59:59.000Z

200

Trends In U.S. Electric Power Transmission  

SciTech Connect

The report provides an overview of the changes that are occurring in the industry to implement the goals of improved reliability and reduced congestion costs. As the electric industry works to become a more efficient market, transmission stands as a key link between the competitive generation and the regulated distribution sectors. In this role as a key link, transmission is a major focus of government efforts to improve reliability and reduce congestion costs. The scope of the report is to analyze the dominant reliability, investment, siting, and competition/open access trends that are occurring in the domestic electric transmission industry. Topics covered include: the impact of the 2003 Northeast blackout on reliability rules; the move from voluntary to mandatory reliability standards; the advent of real-time transmission system monitoring; ISO/RTO efforts to improve system reliability; the drivers of government intervention in transmission investment; the move towards incentive-based rates for transmission investment; legislative and regulatory efforts to spur transmission investment to support renewable energy resources; the emergence of merchant transmission; the need for federal backstop authority on regional transmission projects; the designation of national interest electric transmission corridors; FERC Orders on siting transmission; the need for changes in open access and competition regulations; FERC efforts to increase open access and competition; legislative efforts to increase competition; and, current competitive issues in the industry.

NONE

2007-11-15T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Broadband Water Vapor Transmission Functions for Atmospheric IR Flux Computations  

Science Conference Proceedings (OSTI)

Transmission functions associated with water vapor molecular line and e-type absorption in the IR spectral regions are presented in the form of simple analytical functions and small tables, from which atmospheric IR fluxes and cooling rates can ...

Ming-Dah Chou

1984-05-01T23:59:59.000Z

202

2012 National Electric Transmission Congestion Study- San Diego Workshop  

Energy.gov (U.S. Department of Energy (DOE))

On December 15, 2011, DOE hosted a regional pre-study workshop in San Diego, CA to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. The workshop...

203

2012 National Electric Transmission Congestion Study - San Diego...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

San Diego Workshop 2012 National Electric Transmission Congestion Study - San Diego Workshop On December 15, 2011, DOE hosted a regional pre-study workshop in San Diego, CA to...

204

HIPAA 2013 - The HITECH NPRM: Expansion of HIPAA's ...  

Science Conference Proceedings (OSTI)

... provides transmission services, including any temporary storage of PHI incidental to the transmission service. • Service ...

2013-05-21T23:59:59.000Z

205

USLCI Interconnect Region Electricity datasets, 2008 Datasets...  

Open Energy Info (EERE)

spreadsheet are also included.

Datasets include generation and transmission of electricity for each of the interconnect regions.  It is representative of the year...

206

Western Area Power Administration, Desert Southwest Region  

NLE Websites -- All DOE Office Websites (Extended Search)

5 Western Area Power Administration, Desert Southwest Region Liberty-Parker 2 230-kV Transmission Line Optical Power Ground Wire Repairs - Continuation Sheet Project Description...

207

A multilayer grating with a novel layer structure for a flat-field spectrograph attached to transmission electron microscopes in energy region of 2-4 keV  

SciTech Connect

A multilayer mirror with a novel layer structure to uniformly enhance the reflectivity in a few keV energy range at a fixed angle of incidence is invented and applied to a multilayer grating for use in a flat-field spectrograph attached to a conventional electron microscope. The diffraction efficiency of the fabricated multilayer grating having the new layer structure is evaluated at the angle of incidence of 88.65 deg. in the energy region of 2.1-4.0 keV. It is shown that the multilayer grating is effective to uniformly enhance the diffraction efficiency and able to be practically used in this energy region.

Imazono, T.; Koike, M.; Koeda, M.; Nagano, T.; Sasai, H.; Oue, Y.; Yonezawa, Z.; Kuramoto, S.; Terauchi, M.; Takahashi, H.; Handa, N.; Murano, T. [QuBS, Japan Atomic Energy Agency (JAEA), 8-1-7 Umemidai, Kizugawa, Kyoto 619-0215 (Japan); Device Dept., Shimadzu Corp., 1 Nishinokyo-Kuwabarcho, Nakagyo-ku, Kyoto 604-8511 (Japan); IMRAM, Tohoku University, 2-1-1 Katahira, Aoba-ku, Sendai 980-8577 (Japan); EC Business Unit, JEOL Ltd., 3-1-2 Musashino, Akishima, Tokyo 196-8558 (Japan)

2012-05-17T23:59:59.000Z

208

Model Independent Early Expansion History and Dark Energy  

E-Print Network (OSTI)

We examine model independent constraints on the high redshift and prerecombination expansion history from cosmic microwave background observations, using a combination of principal component analysis and other techniques. This can be translated to model independent limits on early dark energy and the number of relativistic species $N_{\\rm eff}$. Models such as scaling (Doran-Robbers), dark radiation ($\\Delta N_{\\rm eff}$), and barotropic aether fall into distinct regions of eigenspace and can be easily distinguished from each other. Incoming CMB data will map the expansion history from $z=0$--$10^5$, achieving subpercent precision around recombination, and enable determination of the amount of early dark energy and valuable guidance to its nature.

Samsing, Johan; Smith, Tristan L

2012-01-01T23:59:59.000Z

209

Transmission SEAB Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

210

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

1993-01-01T23:59:59.000Z

211

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

212

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

involves the construction of an approximate 1000 mile HVAC and HVDC transmission project from British ACSR. (Northern Segment) b) A 3000 MVA, 500 kV HVAC to +/-500 kV HVDC Converter at the NEO Station. c) A +/-500 kV HVDC line from the NEO Station to the proposed Collinsville Substation in the San Francisco Bay

213

LAP Transmission Rate  

NLE Websites -- All DOE Office Websites (Extended Search)

LAP Transmission Rate 4.50 4.00 3.82 3.50 3.00 of 2.50 c 0 2.I2 2.68 I 3: 2.00 1.50 1.00 0.50 0.00 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012...

214

Transmission Services J7000  

NLE Websites -- All DOE Office Websites (Extended Search)

C T D E S E R T S O U T H W E S T R E G I O N R O C K Y M O U N T A I N R E G I O N Transmission Services J7000 Ensuring the Reliability of the Bulk Electric System Western's...

215

Transmission planning in China  

Science Conference Proceedings (OSTI)

Though China is well along in restructuring its power markets, it still has some way to travel before economic considerations receive adequate weight in transmission planning decisions. Adoption of more sophisticated tools such as multi-agent modeling will help China continue in its progress in achieving this. (author)

Dong, Jun; Zhang, Jing

2009-07-15T23:59:59.000Z

216

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

217

Omega Transmission Lines  

E-Print Network (OSTI)

In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

Vehmas, Joni

2013-01-01T23:59:59.000Z

218

Transmission Enhancement Technology Report  

E-Print Network (OSTI)

to increase transmission capability. Section 3 documents existing technologies used in the industry today the traditional types of design alternatives used by Western and the electric industry. The primary system operate at three times the ampacity of Aluminum Conductor Steel Reinforced (ACSR) conductor and has a much

219

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

Kotlyar, O.M.

1997-03-25T23:59:59.000Z

220

Economics of Transmission Planning: Methods, Examples, and Tools  

Science Conference Proceedings (OSTI)

This report describes an economic planning methodology that can be applied to regional and interregional transmission planning. It is modeled after long-distilled practices at the Midwest Independent System Operator (MISO) and a newer, proposed analysis for identifying the potential interregional developments of greatest mutual benefit to the energy trading regions. Existing and new examples of transmission planning exercises conducted by MISO facilitate the description. MISO background studies introduce...

2011-12-30T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Colorado/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission < Colorado Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Colorado is part of the Western Interconnection power grid, which covers most of the western United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the

222

Wind Energy Transmission | Open Energy Information  

Open Energy Info (EERE)

Wind Energy Transmission Wind Energy Transmission Jump to: navigation, search Just a few years ago, 5% wind energy penetration in the United States was a lofty goal. In Europe, however, some countries have already reached wind energy penetrations of 10% or higher in a short period of time. The growth of domestic wind generation over the past decade has sharpened the focus on two questions: Can the electrical grid accommodate very high amounts of wind energy without jeopardizing security or degrading reliability? And, given that the nation's current transmission infrastructure is already constraining further development of wind generation in some regions, how could significantly larger amounts of wind energy be developed? The answers to these questions could hold the keys to determining how much of a role

223

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

page intentionally left blank page intentionally left blank 129 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2011 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the pattern in the previous year, coupled

224

Arizona/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Arizona/Transmission < Arizona Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Arizona is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including Arizona. WECC

225

Natural Gas Transmission and Distribution Module This  

Gasoline and Diesel Fuel Update (EIA)

This This page inTenTionally lefT blank 127 U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2012 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through a regional interstate representative pipeline network, for both a peak (December through March) and off-peak period during each projection year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. Natural gas flow patterns are a function of the

226

Montana/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Montana/Transmission < Montana Jump to: navigation, search MontanaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Montana is part of both the Eastern and Western Interconnection power grids and is part of two NERC regions - the Midwest Reliability Organization (MRO) and Western Electricity Coordinating Council (WECC). MRO's service territory extends from the state of Nebraska north to

227

2012 National Electric Transmission Congestion Study - Philadelphia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Philadelphia Philadelphia Workshop 2012 National Electric Transmission Congestion Study - Philadelphia Workshop On December 6, 2011, DOE hosted a regional pre-study workshop in Philadelphia, PA to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below. National Electric Transmission Congestion Study 2012 Eastern Workshops.pdf 12-06-11 Congestion Workshop Agenda - Philadelphia (final).pdf Introduction by David Meyer, DOE.pdf Presentation by Edward Finley, NCUC.pdf Presentation by Betty Ann Kane, DC PSC.pdf Presentation by Robert Bradish, American Electric Power.pdf Presentation by John Buechler, NYISO.pdf Presentation by Jim Busbin, Southern Company.pdf

228

Nevada/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Nevada/Transmission < Nevada Jump to: navigation, search NevadaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Nevada is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). WECC is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in Nevada.

229

Microsoft Word - Forest Grove Expansion I CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2011 , 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Amit Sinha - TEP-CSB-2 Proposed Action: Forest Grove Substation Expansion Budget Information: Work Order # 255319 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B4.6 "Additions or modifications to electric power transmission facilities..." Location: Washington County, OR - Section 32, Township 1 North, Range 3 West of the Forest Grove Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to expand Forest Grove Substation located in Washington County, OR. The purpose of this project is to improve load service and reliability within the Portland vicinity as per the NERC reliability standards. Within the existing Forest Grove Substation, the

230

2012 National Electric Transmission Congestion Study Workshops | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Planning » Transmission Planning » Congestion Studies » 2012 National Electric Transmission Congestion Study Workshops 2012 National Electric Transmission Congestion Study Workshops DOE hosted four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. For details, please select a workshop, below. Agendas, presentations, and transcripts are available on the individual workshop pages; please select a workshop from the list below. Note: The November 10, 2011 Federal Register notice incorrectly stated that the four regional workshops would be simulcast over the Internet and that advanced registration for the Webcasts was required. The workshops were not simulcast. The Department requested, but did not require, those who

231

2009 National Electric Transmission Congestion Study Workshops | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Technology Development » Transmission Planning » Services » Technology Development » Transmission Planning » Congestion Studies » 2009 Congestion Study » 2009 National Electric Transmission Congestion Study Workshops 2009 National Electric Transmission Congestion Study Workshops DOE hosted six regional pre-study workshops in mid-2008 to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study, including comments on practical metrics for gauging levels and significance of transmission congestion. Each workshop featured a panel of invited speakers to present their views and comments. For details, including agendas, transcripts, and documents submitted for consideration for the 2009 study, please select a workshop, below. June 11, 2008 San Francisco, CA June 18, 2008 Oklahoma City, OK

232

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

233

Cosmic Growth History and Expansion History  

E-Print Network (OSTI)

The cosmic expansion history tests the dynamics of the global evolution of the universe and its energy density contents, while the cosmic growth history tests the evolution of the inhomogeneous part of the energy density. Precision comparison of the two histories can distinguish the nature of the physics responsible for the accelerating cosmic expansion: an additional smooth component - dark energy - or a modification of the gravitational field equations. With the aid of a new fitting formula for linear perturbation growth accurate to 0.05-0.2%, we separate out the growth dependence on the expansion history and introduce a new growth index parameter \\gamma that quantifies the gravitational modification.

Eric V. Linder

2005-07-11T23:59:59.000Z

234

Concentric ring flywheel without expansion separators  

DOE Patents (OSTI)

A concentric ring flywheel wherein the adjacent rings are configured to eliminate the need for differential expansion separators between the adjacent rings. This is accomplished by forming a circumferential step on an outer surface of an inner concentric ring and forming a matching circumferential step on the inner surface of an adjacent outer concentric ring. During operation the circumferential steps allow the rings to differentially expand due to the difference in the radius of the rings without the formation of gaps therebetween, thereby eliminating the need for expansion separators to take up the gaps formed by differential expansion.

Kuklo, Thomas C. (Oakdale, CA)

1999-01-01T23:59:59.000Z

235

Concentric ring flywheel without expansion separators  

DOE Patents (OSTI)

A concentric ring flywheel wherein the adjacent rings are configured to eliminate the need for differential expansion separators between the adjacent rings. This is accomplished by forming a circumferential step on an outer surface of an inner concentric ring and forming a matching circumferential step on the inner surface of an adjacent outer concentric ring. During operation the circumferential steps allow the rings to differentially expand due to the difference in the radius of the rings without the formation of gaps therebetween, thereby eliminating the need for expansion separators to take up the gaps formed by differential expansion. 3 figs.

Kuklo, T.C.

1999-08-24T23:59:59.000Z

236

Correlation between thermal expansion and heat capacity  

E-Print Network (OSTI)

Theoretically predicted linear correlation between the volume coefficient of thermal expansion and the thermal heat capacity was investigated for highly symmetrical atomic arrangements. Normalizing the data of these thermodynamic parameters to the Debye temperature gives practically identical curves from zero Kelvin to the Debye temperature. This result is consistent with the predicted linear correlation. At temperatures higher than the Debye temperature the normalized values of the thermal expansion are always higher than the normalized value of the heat capacity. The detected correlation has significant computational advantage since it allows calculating the volume coefficient of thermal expansion from one experimental data by using the Debye function.

Jozsef Garai

2004-04-25T23:59:59.000Z

237

Transmission Developers Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

238

Drill string transmission line  

DOE Patents (OSTI)

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

239

Transmission Siting_071508.indd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

240

A Smarter Transmission Grid  

Science Conference Proceedings (OSTI)

Our modern transmission grid transports bulk power over long distances and across many provincial boundaries, but ever-increasing energy demands are significantly transforming it. Worldwide, many catalysts are driving this transformation, including emerging supply- and demand-side technologies, cyber security concerns, and aging infrastructures, to name just a few. As the grid transforms and more grid-connected renewable resources complicate reliability, it will be increasingly difficult to meet its futu...

2010-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Transmission Price Risk Management  

Science Conference Proceedings (OSTI)

This report is concerned with the financial risks that arise from the uncertain price of transmission service in restructured or competitive electricity markets. These risks are most severe in markets with locational pricing (LMP), but they also exist in more traditionally organized electricity markets. This report has two main purposes. The first is to review the existing mathematical models of electricity price formation in spot and forward markets that may be helpful as the foundations for developing ...

2006-12-04T23:59:59.000Z

242

Green Transmission Efficiency Initiative  

Science Conference Proceedings (OSTI)

As a consequence of escalating interest in the environment and climate changea national focus on energy efficiency, and growing electricity demandthe time is right to assess energy efficiency from both an end-use perspective as well as across the utility value chain, from generation, to transmission, to distribution. The reduction of our carbon footprint and increasing the role of renewable energy are an important part of the strategy for the greening for electric energy supply. As a result, efficient po...

2009-07-31T23:59:59.000Z

243

WECC releases its first-ever transmission plan for the Western Interconnection  

Energy.gov (U.S. Department of Energy (DOE))

The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection.

244

A mechanistic approach for accurate simulation of village scale malaria transmission  

E-Print Network (OSTI)

Background: Malaria transmission models commonly incorporate spatial environmental and climate variability for making regional predictions of disease risk. However, a mismatch of these models' typical spatial resolutions ...

Duchemin, Jean-Bernard

245

Ocotillo Wind I Expansion | Open Energy Information  

Open Energy Info (EERE)

I Expansion I Expansion Jump to: navigation, search Name Ocotillo Wind I Expansion Facility Ocotillo Wind I Expansion Sector Wind energy Facility Type Commercial Scale Wind Facility Status Under Construction Owner Pattern Energy Developer Pattern Energy Energy Purchaser San Diego Gas & Electric Location Ocotillo CA Coordinates 32.76302656°, -116.0466957° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.76302656,"lon":-116.0466957,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

246

Century Wind Project Expansion | Open Energy Information  

Open Energy Info (EERE)

Project Expansion Project Expansion Jump to: navigation, search Name Century Wind Project Expansion Facility Century Wind Project Expansion Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner MidAmerican Energy Developer EnXco Energy Purchaser MidAmerican Energy Location Wright and Hamilton Counties IA Coordinates 42.509141°, -93.682151° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.509141,"lon":-93.682151,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

247

Meteorological Network Expansion Using Information Decay Concept  

Science Conference Proceedings (OSTI)

A generalized network design methodology was developed by using the basic entropy concept introduced by Shannon in communication engineering. In order to select potential sites for meteorological network expansion purposes, the meteorological ...

Tahir Husain; Mustafa A. Ukayli; Hasin U. Khan

1986-03-01T23:59:59.000Z

248

Quantization Noise Shaping on Arbitrary Frame Expansions  

E-Print Network (OSTI)

Quantization noise shaping is commonly used in oversampled A/D and D/A converters with uniform sampling. This paper considers quantization noise shaping for arbitrary finite frame expansions based on generalizing the view ...

Boufounos, Petros T.

249

Motiva Enterprises Refinery Expansion Groundbreaking | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

it. When this expansion is complete this facility which is now one of the preeminent refineries on the Gulf Coast will become the largest in the United States and one of the...

250

Flat Ridge 2 Expansion | Open Energy Information  

Open Energy Info (EERE)

Flat Ridge 2 Expansion Flat Ridge 2 Expansion Jump to: navigation, search Name Flat Ridge 2 Expansion Facility Flat Ridge 2 Expansion Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner BP Wind Energy Developer BP Wind Energy Energy Purchaser Arkansas Electric Cooperative Corp Location Sharon KS Coordinates 37.383239°, -98.334088° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.383239,"lon":-98.334088,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

251

WestConnect Transmission Product  

NLE Websites -- All DOE Office Websites (Extended Search)

WestConnect Transmission Product Federal Register Notices Customer Notifications Customer Comments Approved Rate Order FERC Confirmation...

252

Transmission eigenvalues for elliptic operators  

E-Print Network (OSTI)

A reduction of the transmission eigenvalue problem for multiplicative sign-definite perturbations of elliptic operators with constant coefficients to an eigenvalue problem for a non-selfadjoint compact operator is given. Sufficient conditions for the existence of transmission eigenvalues and completeness of generalized eigenstates for the transmission eigenvalue problem are derived. In the trace class case, the generic existence of transmission eigenvalues is established.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

2010-07-03T23:59:59.000Z

253

Electricity Transmission and Distribution Technologies ...  

Electricity Transmission and Distribution Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research ...

254

Transmission Planning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to...

255

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

B. Kirby. 2001. Transmission Planning for a Restructuringindustry_issues/energy_infrastructure/transmission/transmission_hirst.pdf Joskow, P.L. 2005a. “Transmission

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

256

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Certificates of Need for Transmission Lines to Support theMontana-Alberta Tie 230 kV Transmission Line: TransmissionNorthern California Transmission Line Project, Technical

Mills, Andrew D.

2009-01-01T23:59:59.000Z

257

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

Corp. , 2010. Eastern Wind Integration and Transmissionexpansion is limited, wind integration costs are assumed toof wind (BPA, 2009). Wind integration costs in the U.S. are

Mills, Andrew

2010-01-01T23:59:59.000Z

258

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

Corp. , 2010. Eastern Wind Integration and Transmissionof wind (BPA, 2009). Wind integration costs in the U.S. are2009). A recent wind integration study that evaluated up to

Mills, Andrew D

2011-01-01T23:59:59.000Z

259

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

from existing state renewable energy policy requirements,western United States for renewable energy. The Clean andstate and federal regulators, and environmental organizations. The Western Renewable Energy

Mills, Andrew D

2011-01-01T23:59:59.000Z

260

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

of the Choice Facing Renewable Power Projects in the UnitedColorado: National Renewable Energy Laboratory. http://Colorado: National Renewable Energy Laboratory. NREL/SR-550-

Mills, Andrew

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

Colorado: National Renewable Energy Laboratory. NREL/SR-Decisions in the Western Renewable Energy Zone Initiative.Moore, and C.K. Woo. 2009. “Renewable Portfolio Standards,

Mills, Andrew D

2011-01-01T23:59:59.000Z

262

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

Case Category: Case Name: HVDC Long Lines High Utilizationa What if lower unit cost HVDC lines were used for longof renewable technologies? a HVDC lines were assumed to have

Mills, Andrew D

2011-01-01T23:59:59.000Z

263

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

zone in the Base case, the HVDC Long Lines case, and the RECselection to meet 33% RE WECC-wide in the HVDC Long LinesREC Base Case Short Line HVDC Long Lines Equal Solar Finance

Mills, Andrew

2010-01-01T23:59:59.000Z

264

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

evaluated in an advanced production cost model. The Windin which the marginal production cost in the power system isbecause marginal production costs vary by load zone, the TOD

Mills, Andrew D

2011-01-01T23:59:59.000Z

265

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

J. Milford. 2008. Production Cost Modeling for High Levelshand, uses an advanced production cost model (PROMOD) toof conventional generators. A production cost model of this

Mills, Andrew

2010-01-01T23:59:59.000Z

266

A Malaysian Case Study on the Transmission Expansion/Investment Using Value-Based Approach  

Science Conference Proceedings (OSTI)

The introduction of Incentive Based Regulation as the tariff framework in Malaysia's Electricity Supply Industry calls for efficiency in the creation of a new asset while meeting the required reliability. In line with the new regulatory framework, Tenaga ... Keywords: asset management, incentive based regulation, life cycle cost, value-based approach, reliability

Joon Ibrahim, Nor Ziha Zainol Abidin

2013-04-01T23:59:59.000Z

267

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

trip efficiency of 90%. We dispatched a Nevada solar thermalefficiency losses. Generation profiles for wind energy and solar technologies without thermalsolar technology used in the Base case, offers a low-cost, highly-efficiency mechanism for solar thermal

Mills, Andrew

2010-01-01T23:59:59.000Z

268

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

$10/MWh for wind Average Energy Price Integration Costs Highprices: The case of wind electricity in Spain. ” Energy

Mills, Andrew

2010-01-01T23:59:59.000Z

269

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

analyzed (38-65%). Solar energy is almost always the secondthan the average value of solar energy. Load-sited CCGT (renewable energy demand. Solar energy is the second largest

Mills, Andrew

2010-01-01T23:59:59.000Z

270

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

Colorado: National Renewable Energy Laboratory. http://Colorado: National Renewable Energy Laboratory. NREL/SR-550-Finn, J. 2009. Western Renewable Energy Zones, Phase 1: QRA

Mills, Andrew

2010-01-01T23:59:59.000Z

271

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

Colorado: National Renewable Energy Laboratory. NREL/SR-Decisions in the Western Renewable Energy Zone Initiative.Finn, J. 2009. Western Renewable Energy Zones, Phase 1: QRA

Mills, Andrew D

2011-01-01T23:59:59.000Z

272

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

time-of- delivery energy costs—which are due to the timeTime-of-Delivery Energy Value 13 Capacity Value 16 Integration Cost ..energy costs displaced by electricity from a renewable resource (the time-

Mills, Andrew

2010-01-01T23:59:59.000Z

273

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

technology: Solar Thermal, Dry Cooling with Storage: What ifcooling? 22 Solar Thermal, Wet Cooling without Storage: Whatof a solar thermal plant with wet cooling and no storage to

Mills, Andrew

2010-01-01T23:59:59.000Z

274

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

Low Resource Adequacy Cost Solar Thermal, Dry Cooling withStorage Solar Thermal, Wet Cooling without Storage Fixed PV

Mills, Andrew D

2011-01-01T23:59:59.000Z

275

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

Short-term Variability of Solar Power. Berkeley, California:Integration of Concentrating Solar Power and Utility-ScaleIncentives on Concentrating Solar Power Market Penetration.

Mills, Andrew D

2011-01-01T23:59:59.000Z

276

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

reduction in average renewable energy costs WECC-wide byscenarios on renewable energy supply costs and transmissiondifferent renewable energy procurement, technology cost,

Mills, Andrew D

2011-01-01T23:59:59.000Z

277

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

The Surprising Value of Wind Farms as Generating Capacity. ”nameplate capacity of the wind farm. While this is an option

Mills, Andrew

2010-01-01T23:59:59.000Z

278

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

alone. In real energy markets, prices rise above marginalfrom revenues in energy markets. Because energy prices inenergy markets may rise above the marginal production cost of peaker plants due to scarcity pricing, the forward capacity market prices

Mills, Andrew

2010-01-01T23:59:59.000Z

279

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

to the capacity factor. A baseload resource that has a flatof 100%; the ratio for a baseload unit would therefore behigher than that of a baseload unit (Grubb, 1991; Stoft,

Mills, Andrew D

2011-01-01T23:59:59.000Z

280

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

and value components of a baseload CCGT are presented asare equivalent between baseload resources such as geothermalresource than it is for a baseload resource, increasing the

Mills, Andrew

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

12 X 24 resource and load profiles from the WREZ resourceproduction cost and load profile of Los Angeles. We thenX 24 average generation and load profiles. 17 Each renewable

Mills, Andrew

2010-01-01T23:59:59.000Z

282

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

Wyoming Geothermal Biomass Hydro Wind Solar PV ThermalIntegration costs for PV and solar thermal without thermalDry Cooled Solar Thermal with Storage Fixed PV In addition

Mills, Andrew

2010-01-01T23:59:59.000Z

283

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

Hild. 2004. “The Value of Wind Energy as a Function of Wind2: Capacity credit. ” Wind Energy 3(4): 167–206. Milligan,Energy (DOE). 2008. 20% Wind Energy by 2030: Increasing Wind

Mills, Andrew D

2011-01-01T23:59:59.000Z

284

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

zones where wind energy is the least cost resource under acosts incurred to manage the variability and uncertainty of wind energycosts are likely to be similar to those for wind energy.

Mills, Andrew D

2011-01-01T23:59:59.000Z

285

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

increases the bus-bar cost of wind energy by $40/MWh. As atargets. The bus-bar cost of wind energy, in contrast, is aAdjusted delivered cost American Wind Energy Association

Mills, Andrew

2010-01-01T23:59:59.000Z

286

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

by economic factors. Hydro Energy From Each Resource (TWh/model TOD Energy Factor Technology Hydro Biomass Geothermal33% RE Renewable Energy (TWh/yr) Wind Solar Hydro Biom as s

Mills, Andrew

2010-01-01T23:59:59.000Z

287

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative  

E-Print Network (OSTI)

33% RE Renewable Energy (TWh/yr) Wind Solar Hydro Biomass$/MWh) Energy- Weighted Median (10th; 90th Percentile) Hydroenergy. Load-sited CCGT (Sacramento) Geothermal Biomass Hydro

Mills, Andrew D

2011-01-01T23:59:59.000Z

288

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

289

Combining Positive and Negative Thermal Expansion Materials to ...  

Science Conference Proceedings (OSTI)

Presentation Title, Combining Positive and Negative Thermal Expansion Materials to Tailor the Coefficient of Thermal Expansion in Metal/Ceramic Composites.

290

Year-in-Review: 2012 Energy Infrastructure Events and Expansions...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Year-in-Review: 2012 Energy Infrastructure Events and Expansions Now Available (July 2013) Year-in-Review: 2012 Energy Infrastructure Events and Expansions Now Available (July...

291

Secretary Chu Celebrates Expansion of Lithium-Ion Battery Production...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Celebrates Expansion of Lithium-Ion Battery Production in North Carolina Secretary Chu Celebrates Expansion of Lithium-Ion Battery Production in North Carolina July 26, 2011 -...

292

EIS-0488: Cameron Pipeline Expansion Project and Cameron LNG...  

NLE Websites -- All DOE Office Websites (Extended Search)

88: Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Cameron Parish, LA EIS-0488: Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project,...

293

EIA - Natural Gas Pipeline Network - Expansion Process Flow Diagram  

Annual Energy Outlook 2012 (EIA)

Natural Gas based on data through 20072008 with selected updates Development and Expansion Process For Natural Gas Pipeline Projects Figure showing the expansion process...

294

EA-0845: Expansion of the Idaho National Engineering Laboratory...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marketing Administration Other Agencies You are here Home EA-0845: Expansion of the Idaho National Engineering Laboratory Research Center, Idaho Falls, Idaho EA-0845: Expansion...

295

Expansion and Improvement of Solar Water Heating Technology in...  

Open Energy Info (EERE)

Expansion and Improvement of Solar Water Heating Technology in China Project Management Office Jump to: navigation, search Name Expansion and Improvement of Solar Water Heating...

296

Electric Transmission Line Siting Compact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

297

NREL: Transmission Grid Integration - Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

298

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications Proceedings of the March 25-26, 2009 Conference for the...

299

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

stability  analysis of transmission and distribution Voltage Recovery, NERC Transmission Issues  Subcommitte Air Conditioner Response to Transmission Faults. ” ,” IEEE 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

300

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

differences: models for transmission property rights,” IEEEto solve power transmission network design problems,” IEEES. A. "Network topologies and transmission investment under

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Georgia Transmission Corp | Open Energy Information  

Open Energy Info (EERE)

Georgia Transmission Corp Place Georgia Utility Id 7197 Utility Location Yes Ownership T NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission Yes...

302

A PRECISION ANALOG FIBER OPTIC TRANSMISSION SYSTEM  

E-Print Network (OSTI)

Optical Fibers for Transmission, John Wiley and Sons, 9.Laboratories, Transmission Systems for Communications, BellANALOG FIBER OPTIC TRANSMISSION SYSTEM G. Stover M.S. Thesis

Stover, G.

2010-01-01T23:59:59.000Z

303

Definition: Transmission Customer | Open Energy Information  

Open Energy Info (EERE)

Load-Serving Entity, or Purchasing-Selling Entity.1 Related Terms transmission service, transmission lines, transmission line References Glossary of Terms Used in Reliability...

304

Definition: Transmission Owner | Open Energy Information  

Open Energy Info (EERE)

facilities.1 Related Terms Transmission Operatortransmission lines, transmission line, transmission lines References Glossary of Terms Used in Reliability Standards An in...

305

Automated manual transmission clutch controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (9375 Kearney Rd., Whitmore Lake, MI 48189); Reed, Jr., Richard G. (3003 Bembridge, Royal Oak, MI 48073); Rausen, David J. (519 S. Gaylord St., Denver, CO 80209)

1999-11-30T23:59:59.000Z

306

Transmission Workshop | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

307

Particle swarm optimization based on model space theory and its application on transmission network planning  

Science Conference Proceedings (OSTI)

A model space and space compression theory is developed. The theory defined an N-1 security network as a model, and then defined a model space according a given model. Using this theory in Particle Swarm Optimization can prevent particles form searching ... Keywords: model, model space, model structure mutation, particle swarm optimization, transmission network expansion planning

Yi-Xiong Jin; Juan Su

2007-04-01T23:59:59.000Z

308

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network (OSTI)

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

309

2009 National Electric Transmission Congestion Study - Chicago Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chicago Chicago Workshop 2009 National Electric Transmission Congestion Study - Chicago Workshop On September 17, 2008, DOE hosted a regional pre-study workshop in Chicago, IL to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 9-17-08 Congestion Workshop Agenda - Chicago, IL.pdf Transcript - 2009 National Electric Transmission Congestion Study Chicago Workshop.pdf Statement of Michael J. Kormos, PJM Interconnection, submitted at 2009 Congestion Study Chicago workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop

310

2009 National Electric Transmission Congestion Study - Hartford Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 National Electric Transmission Congestion Study - Hartford 2009 National Electric Transmission Congestion Study - Hartford Workshop 2009 National Electric Transmission Congestion Study - Hartford Workshop On July 9, 2008, DOE hosted a regional pre-study workshop in Hartford, CT to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 7-09-08 Congestion Workshop Agenda - Hartford, CT.pdf Transcript - 2009 National Electric Transmission Congestion Study Hartford Workshop.pdf Comments of the New York Independent System Operator, submitted at 2009 Congestion Study Hartford workshop_0.pdf Prepared Remarks of Brian Forshaw, Connecticut Municipal Electric Energy Cooperative, submitted at 2009 Congestion Study Hartford workshop_0.pdf

311

DOE Seeking Information on Transmission Line Permitting | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Seeking Information on Transmission Line Permitting Seeking Information on Transmission Line Permitting DOE Seeking Information on Transmission Line Permitting February 27, 2012 - 3:25pm Addthis The Department of Energy's Office of Electricity Delivery and Energy Reliability is seeking information on the questions related to permitting of transmission lines. Infrastructure projects - such as high voltage, long distance, electric transmission facilities - often involve multiple Federal, State, local, and Tribal authorizations and are subject to a wide array of processes and procedural requirements in order to obtain all necessary permits and other authorizations. Delays in securing required statutory reviews, permits, and consultations can threaten the completion projects of national and regional significance. This Request for

312

National Electric Transmission Congestion Study 2012 Workshops | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Congestion Study 2012 Workshops Transmission Congestion Study 2012 Workshops National Electric Transmission Congestion Study 2012 Workshops DOE will host four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the National Electric Transmission Congestion Study 2012. For details, please see the pdfs, below. Online registration for these workshops is now available. Agendas are available below. Note: The November 10, 2011 Federal Register notice incorrectly stated that the four regional workshops will be simulcast over the Internet and that advanced registration for the Webcasts is required. The workshops will not be simulcast. The Department requests, but does not require, those who are planning to attend the workshops in person to pre-register using the link

313

Forward Expansion Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Forward Expansion Wind Farm Forward Expansion Wind Farm Facility Forward Expansion Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Invenergy Developer Invenergy Energy Purchaser Alliant- Wisconsin Public Service-Madison Gas & Electric- Wisconsin Public Power Location Dodge and Fond du Lac Counties WI Coordinates 43.631519°, -88.556421° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.631519,"lon":-88.556421,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

314

DOE/EA-0845 Environmental Assessment Expansion  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

45 45 Environmental Assessment Expansion of the Idaho National Engineering Laboratory Research Center March 1994 U.S. Department of Energy MASTER DOE Idaho Operations Office Idaho Falls, Idaho _.OJ Oi_lll_lHl:lUTION OF TFII$O_r, UM_._T _ U_LJ_!_3'_ [6450-01] U.S. DEPARTMENT OF ENERGY FINDINGOF NO SIGNIFICANT IMPACT . FOR EXPANSION OF THE IDAHONATIONALENGINEERING LABORATORY RESEARCH CENTER AGENCY: Department of Energy ACTION: Findingof No Significant Impact(FONSI) SUMMARY: The Department of Energy(DOE)has prepared an environmental assessment (EA),DOE/EA-0845, for expansion and upgrade of facilities at the IdahoNationalEngineering Laboratory (INEL)Research Center(IRC)in Idaho Falls,Idaho. Construction and operation of proposed facilities wouldnot causesignificant environmental impacts. Basedon the analysesin the EA, DOE has determined that the proposedactionis

315

DOE Affirms National Interest Electric Transmission Corridor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest...

316

Full Text of the National Electric Transmission Congestion Study 2006  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUGUST AUGUST 2006 U.S. Department of Energy NATIONAL ELECTRIC TRANSMISSION CONGESTION STUDY AUGUST 2006 U.S. Department of Energy NATIONAL ELECTRIC TRANSMISSION CONGESTION STUDY AUGUST 2006 U.S. Department of Energy Contents Executive Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii Acronyms Used in This Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi 1. Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1. Organization of This Study . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.2. Definitions of Key Terms and Concepts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 1.3. Consultation with States and Regional Entities. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 2. Study Approach and Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

317

Electricity transmission: an overview of the current debate  

E-Print Network (OSTI)

, FERC, pursued the implementation of a Standard Market Design and encouraging larger Regional Transmission Organisations to facilitate efficient trade over wider areas and transmission investment. In Europe, under prompting from the European... will soon be) implemented in some variation in several states in the US (e.g. PJM, New York, New England, Texas and California) and is a cornerstone of FERC’s proposed Standard Market Design. For short-run congestion management there is agreement that a...

Brunekreeft, Gert; Neuhoff, Karsten; Newbery, David

2006-03-14T23:59:59.000Z

318

Narrow-band optical transmission of metallic nanoslit arrays  

Science Conference Proceedings (OSTI)

Metallic nanoslit arrays usually demonstrate wide transmission bands for transverse-magnetic-polarized incidence light. Here, we show that by introducing multi-dielectric layers underneath the metallic structure layer on the substrate, a narrow peak is formed, whose bandwidth can be down to a few nanometers. Three types of resonance modes in the region under the metal layer are identified responsible for the formation of the peak, i.e., a two-dimensional cavity resonance mode, which supports optical transmission, and two in-plane hybrid surface plasmon resonance modes locating on both sides of the peak that suppresses the transmission. Such structures can be applied in advanced photonic devices.

Sun Zhijun; Yang Ying; Zuo Xiaoliu [Department of Physics, Xiamen University, Xiamen 361005 (China)

2012-10-22T23:59:59.000Z

319

Kentucky Transmission Line Siting Methodology  

Science Conference Proceedings (OSTI)

EPRI, in conjunction with Georgia Transmission Corporation (GTC) and Photo Science, Inc. (PSI), developed a standardized methodology for siting overhead electric transmission lines. EPRI report 1013080, EPRI-GTC Overhead Electric Transmission Line Siting Methodology, published February 2006, provides additional information. This methodology has been applied in Georgia and currently is being applied to projects in Kentucky by East Kentucky Power Cooperative and E.ON U.S. on behalf of Louisville Gas and El...

2007-12-18T23:59:59.000Z

320

NREL: Transmission Grid Integration - Webmaster  

NLE Websites -- All DOE Office Websites (Extended Search)

reply. Your name: Your email address: Your message: Send Message Printable Version Transmission Grid Integration Home Issues Projects Research Staff Working with Us Publications...

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

NREL: Transmission Grid Integration - Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Generation Integration Study Oahu Wind Integration and Transmission SIND Toolkit Electricity Market Design Energy Imbalance Markets Flexible Energy Scheduling Tool for...

322

REGIONAL WATER SUPPLY PLANNING AND  

E-Print Network (OSTI)

accepted standards, which is an important planning aspect for water supply agencies. Yeh et al. (2000CHAPTER 3 REGIONAL WATER SUPPLY PLANNING AND CAPACITY EXPANSION MODELS Messele Z. Ejeta California Department of Water Resources Sacramento, California Larry W. Mays Department of Civil and Environmental

Mays, Larry W.

323

Grid Expansion Planning for Carbon Emissions Reduction  

SciTech Connect

There is a need to upgrade and expand electric power transmission and generation to meet specified renewable energy targets and simultaneously minimize construction cost and carbon emissions. Some challenges are: (1) Renewable energy sources have variable production capacity; (2) Deficiency of transmission capacity at desirable renewable generation locations; (3) Need to incorporate models of operations into planning studies; and (4) Prevent undesirable operational outcomes such as negative dispatch prices or curtailment of carbon neutral generation.

Bent, Russell W. [Los Alamos National Laboratory; Toole, Gasper L. [Los Alamos National Laboratory

2012-07-18T23:59:59.000Z

324

Optical Fiber Sensors For Monitoring Joint Articulation And Chest Expansion Of A Human Body  

DOE Patents (OSTI)

Fiber-optic sensors employing optical fibers of elastomeric material are incorporated in devices adapted to be worn by human beings in joint and chest regions for the purpose of monitoring and measuring the extent of joint articulation and chest expansion especially with respect to time.

Muhs, Jeffrey D. (Lenoir City, TN); Allison, Stephen W. (Knoxville, TN)

1997-12-23T23:59:59.000Z

325

The interior transmission problem and bounds on transmission eigenvalues  

E-Print Network (OSTI)

We study the interior transmission eigenvalue problem for sign-definite multiplicative perturbations of the Laplacian in a bounded domain. We show that all but finitely many complex transmission eigenvalues are confined to a parabolic neighborhood of the positive real axis.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

2010-09-28T23:59:59.000Z

326

The interior transmission problem and bounds on transmission eigenvalues  

E-Print Network (OSTI)

We study the interior transmission eigenvalue problem for sign-definite multiplicative perturbations of the Laplacian in a bounded domain. We show that all but finitely many complex transmission eigenvalues are confined to a parabolic neighborhood of the positive real axis.

Hitrik, Michael; Ola, Petri; Päivärinta, Lassi

2010-01-01T23:59:59.000Z

327

Stateline Expansion Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Stateline Expansion Wind Farm Stateline Expansion Wind Farm Jump to: navigation, search Name Stateline Expansion Wind Farm Facility Stateline Expansion Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra Energy Resources Developer NextEra Energy Resources Energy Purchaser PPM Energy Inc Location Walla Walla County OR Coordinates 46.012769°, -118.751528° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.012769,"lon":-118.751528,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

328

Natural Gas Pipeline and System Expansions  

Reports and Publications (EIA)

This special report examines recent expansions tothe North American natural gas pipeline networkand the nature and type of proposed pipeline projects announced or approved for construction during the next several years in the United States. It includes those projects in Canada and Mexico that tie in with U.S. markets or projects.

Information Center

1997-04-01T23:59:59.000Z

329

Loop expansion in Yang-Mills thermodynamics  

E-Print Network (OSTI)

We argue that a selfconsistent spatial coarse-graining, which involves interacting (anti)calorons of unit topological charge modulus, implies that real-time loop expansions of thermodynamical quantities in the deconfining phase of SU(2) and SU(3) Yang-Mills thermodynamics are, modulo 1PI resummations, determined by a finite number of connected bubble diagrams.

Ralf Hofmann

2006-09-05T23:59:59.000Z

330

ARGONNE NATIONAL LABORATORY BUILDING 400A EXPANSION  

E-Print Network (OSTI)

ARGONNE NATIONAL LABORATORY LEMONT, IL BUILDING 400A EXPANSION 3 WEEK LOOK AHEAD SCHEDULE PROJECT Touch Up Paint X X X X X B&A Install Insulation At North Parapet Walls X X Scrub / Clean Floors X X Seal OPEN Final Clean Building X TRIUMPH Caulk Interior Floors / Concrete / Frames X X G&L Water Test

Kemner, Ken

331

Entity set expansion in opinion documents  

Science Conference Proceedings (OSTI)

Opinion mining has been an active research area in recent years. The task is to extract opinions expressed on entities and their attributes. For example, the sentence, "I love the picture quality of Sony cameras," expresses a positive opinion on the ... Keywords: entity extraction, set expansion, text mining

Lei Zhang; Bing Liu

2011-06-01T23:59:59.000Z

332

Statistical source expansion for question answering  

Science Conference Proceedings (OSTI)

A source expansion algorithm automatically extends a given text corpus with related content from large external sources such as the Web. The expanded corpus is not intended for human consumption but can be used in question answering (QA) and other information ... Keywords: TREC, information retrieval, jeopardy, question answering, watson

Nico Schlaefer; Jennifer Chu-Carroll; Eric Nyberg; James Fan; Wlodek Zadrozny; David Ferrucci

2011-10-01T23:59:59.000Z

333

Intrepid Expansion Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Intrepid Expansion Wind Farm Intrepid Expansion Wind Farm Jump to: navigation, search Name Intrepid Expansion Wind Farm Facility Intrepid Expansion Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner MidAmerican Energy Developer MidAmerican Energy Energy Purchaser MidAmerican Energy Location Buena Vista & Sac Counties IA Coordinates 42.483311°, -95.308807° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.483311,"lon":-95.308807,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

334

216-B-3 expansion ponds closure plan  

SciTech Connect

This document describes the activities for clean closure under the Resource Conservation and Recovery Act of 1976 (RCRA) of the 216-B-3 Expansion Ponds. The 216-B-3 Expansion Ponds are operated by the US Department of Energy, Richland Operations Office (DOE-RL) and co-operated by Westinghouse Hanford Company (Westinghouse Hanford). The 216-B-3 Expansion Ponds consists of a series of three earthen, unlined, interconnected ponds that receive waste water from various 200 East Area operating facilities. The 3A, 3B, and 3C ponds are referred to as Expansion Ponds because they expanded the capability of the B Pond System. Waste water (primarily cooling water, steam condensate, and sanitary water) from various 200 East Area facilities is discharged to the Bypass pipe (Project X-009). Water discharged to the Bypass pipe flows directly into the 216-B-3C Pond. The ponds were operated in a cascade mode, where the Main Pond overflowed into the 3A Pond and the 3A Pond overflowed into the 3C Pond. The 3B Pond has not received waste water since May 1985; however, when in operation, the 3B Pond received overflow from the 3A Pond. In the past, waste water discharges to the Expansion Ponds had the potential to have contained mixed waste (radioactive waste and dangerous waste). The radioactive portion of mixed waste has been interpreted by the US Department of Energy (DOE) to be regulated under the Atomic Energy Act of 1954; the dangerous waste portion of mixed waste is regulated under RCRA.

1994-10-01T23:59:59.000Z

335

EC Transmission Line Materials  

SciTech Connect

The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

Bigelow, Tim S [ORNL

2012-05-01T23:59:59.000Z

336

Chapter 4 Transmission Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development and deployment of a national strategy on transmission that meets the needs of all parties is extremely complex; however, a solution is desperately needed. Chapter 4 Transmission Adequacy More Documents & Publications Draft Chapter 4: Transmission Adequacy

337

Duke Energy's Transmission Roadmap Initiative  

Science Conference Proceedings (OSTI)

Duke Energy's Transmission Roadmap Initiative advances a vision for development of a power delivery communications and automation infrastructure. The initiative describes performance of a communications upgrade to substations, implementation of select technologies and applications, and integration of enterprise applications, databases, and systems. This report provides a comprehensive view of Duke's Transmission Roadmap Initiative, with a complete technology assessment, infrastructure overview, and discu...

2009-09-18T23:59:59.000Z

338

HVDC power transmission technology assessment  

SciTech Connect

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

339

ITC Transmission | Open Energy Information  

Open Energy Info (EERE)

ITC Transmission ITC Transmission Jump to: navigation, search Name ITC Transmission Place Michigan Utility Id 56068 Utility Location Yes Ownership T NERC RFC Yes ISO MISO Yes Activity Transmission Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=ITC_Transmission&oldid=410858" Categories: EIA Utility Companies and Aliases Utility

340

Transmission Reliability | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Four regional transmission organizations set new or nearly broke ...  

U.S. Energy Information Administration (EIA)

CORRECTION: ISO-NE did not set a new all-time system demand record on July 22, 2011, as previously reported in Today in Energy on July 25, 2011.

342

Integrating Wind into Transmission Planning: The Rocky Mountain Area Transmission Study (RMATS): Preprint  

DOE Green Energy (OSTI)

Plans to expand the western grid are now underway. Bringing power from low-cost remote resources--including wind--to load centers could reduce costs for all consumers. But many paths appear to be already congested. Locational marginal price-based modeling is designed to identify the most cost-effective paths to be upgraded. The ranking of such paths is intended as the start of a process of political and regulatory approvals that are expected to result in the eventual construction of new and upgraded lines. This paper reviews the necessary data and analytical tasks to accurately represent wind in such modeling, and addresses some policy and regulatory issues that can help with wind integration into the grid. Providing wind fair access to the grid also (and more immediately) depends on tariff and regulatory changes. Expansion of the Rocky Mountain Area Transmission Study (RMATS) study scope to address operational issues supports the development of transmission solutions that enable wind to connect and deliver power in the next few years--much sooner than upgrades can be completed.

Hamilton, R.; Lehr, R.; Olsen, D.; Nielsen, J.; Acker, T.; Milligan, M.; Geller, H.

2004-03-01T23:59:59.000Z

343

Atmospheric pressure scanning transmission electron microscopy  

SciTech Connect

Scanning transmission electron microscope (STEM) images of gold nanoparticles (2.1 nm average diameter) at atmospheric pressure have been recorded through a 0.36 mm thick mixture of CO, O2 and He. This was accomplished using a reaction cell consisting of two electron-transparent silicon nitride membranes mounted on a specially designed specimen rod. Gas flow occurred through plastic tubing from the outside of the microscope to the specimen region and back. Gold nanoparticles of a full width half maximum diameter of 1.0 nm were visible above the background noise and the achieved resolution was 0.5 nm in accordance with calculations of the beam broadening.

De Jonge, Niels [ORNL; Veith, Gabriel M [ORNL; Bigelow, Wilbur C [ORNL

2010-01-01T23:59:59.000Z

344

Workshop title: Transmission and Utility Scale Solar Opportunities "South of Phoenix" (or should we say "in Arizona" if we inc  

NLE Websites -- All DOE Office Websites (Extended Search)

Purpose: A stakeholder communication with transmission customers, Tribes, developers, state Purpose: A stakeholder communication with transmission customers, Tribes, developers, state and federal agencies, and utilities about Western Area Power Administration's (Western) Rocky Mountain Region (RMR) and its Transmission Planning and Business Unit. The workshop will provide an overview of Western RMR's transmission planning and services and provide an opportunity for open discussion on overcoming transmission challenges in the region. The workshop will also meet the local transmission planning process requirements for FERC Order 890 as outlined in Western's Open Access Transmission Tariff.

345

The Cost of Transmission for Wind Energy: A Review of Transmission...  

NLE Websites -- All DOE Office Websites (Extended Search)

Wind Energy: A Review of Transmission Planning Studies Title The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies Publication Type Report Year of...

346

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Certificates of Need for Transmission Lines to Support theand Preference in Transmission Service. ” Washington, D.C. :Integrating Wind into Transmission Planning: The Rocky

Mills, Andrew D.

2009-01-01T23:59:59.000Z

347

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

low unit transmission costs, there were still numerous studies with high transmission voltages that had much higher unit costs than studies with transmission lines

Mills, Andrew D.

2009-01-01T23:59:59.000Z

348

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

Transmission Planning and Wind Energy. Issue Brief. August.of new transmission for wind energy due to the complex andincreasingly including wind energy in transmission plans. We

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

349

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

such as major transmission lines or large generators, areto the nearest bulk transmission line is the only dedicatedon constrained transmission lines (or conversely, pay

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

350

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

transmission cost barrier for wind energy. A secondary goalfocus on the cost of transmission for wind energy does notincremental cost of transmission for wind energy implied by

Mills, Andrew D.

2009-01-01T23:59:59.000Z

351

Hydrodynamic gradient expansion in gauge theory plasmas  

E-Print Network (OSTI)

We utilize the fluid-gravity duality to investigate the large order behavior of hydrodynamic gradient expansion of the dynamics of a gauge theory plasma system. This corresponds to the inclusion of dissipative terms and transport coefficients of very high order. Using the dual gravity description, we calculate numerically the form of the stress tensor for a boost-invariant flow in a hydrodynamic expansion up to terms with 240 derivatives. We observe a factorial growth of gradient contributions at large orders, which indicates a zero radius of convergence of the hydrodynamic series. Furthermore, we identify the leading singularity in the Borel transform of the hydrodynamic energy density with the lowest nonhydrodynamic excitation corresponding to a `nonhydrodynamic' quasinormal mode on the gravity side.

Michal P. Heller; Romuald A. Janik; Przemyslaw Witaszczyk

2013-02-04T23:59:59.000Z

352

Low thermal expansion seal ring support  

DOE Patents (OSTI)

Today, the trend is to increase the temperature of operation of gas turbine engines. To cool the components with compressor discharge air, robs air which could otherwise be used for combustion and creates a less efficient gas turbine engine. The present low thermal expansion sealing ring support system reduces the quantity of cooling air required while maintaining life and longevity of the components. Additionally, the low thermal expansion sealing ring reduces the clearance "C","C'" demanded between the interface between the sealing surface and the tip of the plurality of turbine blades. The sealing ring is supported by a plurality of support members in a manner in which the sealing ring and the plurality of support members independently expand and contract relative to each other and to other gas turbine engine components.

Dewis, David W. (San Diego, CA); Glezer, Boris (Del Mar, CA)

2000-01-01T23:59:59.000Z

353

New Constraints on the Early Expansion History  

E-Print Network (OSTI)

Cosmic microwave background measurements have pushed to higher resolution, lower noise, and more sky coverage. These data enable a unique test of the early universe's expansion rate and constituents such as effective number of relativistic degrees of freedom and dark energy. Using the most recent data from Planck and WMAP9, we constrain the expansion history in a model independent manner from today back to redshift z=10^5. The Hubble parameter is mapped to a few percent precision, limiting early dark energy and extra relativistic degrees of freedom within a model independent approach to 2-16% and 0.71 equivalent neutrino species respectively (95% CL). Within dark radiation, barotropic aether, and Doran-Robbers models, the early dark energy constraints are 3.3%, 1.9%, 1.2% respectively.

Hojjati, Alireza; Samsing, Johan

2013-01-01T23:59:59.000Z

354

Frostless heat pump having thermal expansion valves  

DOE Patents (OSTI)

A heat pump system having an operable relationship for transferring heat between an exterior atmosphere and an interior atmosphere via a fluid refrigerant and further having a compressor, an interior heat exchanger, an exterior heat exchanger, a heat pump reversing valve, an accumulator, a thermal expansion valve having a remote sensing bulb disposed in heat transferable contact with the refrigerant piping section between said accumulator and said reversing valve, an outdoor temperature sensor, and a first means for heating said remote sensing bulb in response to said outdoor temperature sensor thereby opening said thermal expansion valve to raise suction pressure in order to mitigate defrosting of said exterior heat exchanger wherein said heat pump continues to operate in a heating mode.

Chen, Fang C [Knoxville, TN; Mei, Viung C [Oak Ridge, TN

2002-10-22T23:59:59.000Z

355

Energy Landscapes: Coal Canals, Oil Pipelines, Electricity Transmission Wires in the Mid-Atlantic, 1820-1930.  

E-Print Network (OSTI)

??Coal canals, oil pipelines, and electricity transmission wires transformed the built environment of the American mid-Atlantic region between 1820 and 1930. By transporting coal, oil,… (more)

Jones, Christopher F.

2009-01-01T23:59:59.000Z

356

Expansion-free Cylindrically Symmetric Models  

E-Print Network (OSTI)

This paper investigates cylindrically symmetric distribution of an-isotropic fluid under the expansion-free condition, which requires the existence of vacuum cavity within the fluid distribution. We have discussed two family of solutions which further provide two exact models in each family. Some of these solutions satisfy Darmois junction condition while some show the presence of thin shell on both boundary surfaces. We also formulate a relation between the Weyl tensor and energy density.

M. Sharif; Z. Yousaf

2013-10-30T23:59:59.000Z

357

SunShot Initiative: Transmission Grid Integration  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Grid Integration to Transmission Grid Integration to someone by E-mail Share SunShot Initiative: Transmission Grid Integration on Facebook Tweet about SunShot Initiative: Transmission Grid Integration on Twitter Bookmark SunShot Initiative: Transmission Grid Integration on Google Bookmark SunShot Initiative: Transmission Grid Integration on Delicious Rank SunShot Initiative: Transmission Grid Integration on Digg Find More places to share SunShot Initiative: Transmission Grid Integration on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Distribution Grid Integration Transmission Grid Integration Solar Resource Assessment Technology Validation Power Electronics & Balance of System Hardware Technologies Competitive Awards

358

Midwest Transmission Workshop I Summary  

SciTech Connect

OAK-B135 The meeting was opened with a review of the purposes of the workshop: (1) Present and discuss key studies and assessments of transmission upgrades, additions and related issues for the upper Midwest, including work that addresses the full range of views on these topics; (2) Understand the various transmission issues in the upper Midwest and discuss options for addressing the issues; and (3) Identify the decision makers and entities that need to play an active role if transmission issues are to be resolved, and agree on next steps for engaging these individuals and organizations through education, outreach, and information dissemination.

Kevin Bryan

2001-05-01T23:59:59.000Z

359

Electrical transmission line diametrical retainer  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

360

Assumptions to the Annual Energy Outlook 2002 - Natural Gas Transmission  

Gasoline and Diesel Fuel Update (EIA)

Natural Gas Transmission and Distribution Module Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each forecast year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. In addition, natural gas flow patterns are a function of the pattern in the previous year, coupled with the relative prices of gas supply options as translated to the represented market

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

2009 National Electric Transmission Congestion Study - San Francisco  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

San San Francisco Workshop 2009 National Electric Transmission Congestion Study - San Francisco Workshop On June 11, 2008, DOE hosted a regional pre-study workshop in San Francisco, CA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 6-11-08 Congestion Workshop Agenda - San Francisco, CA.pdf Transcript - 2009 National Electric Transmission Congestion Study San Francisco Workshop.pdf California Initiatives To Be Considered in DOE's 2009 Congestion Study, submitted at 2009 Congestion Study San Francisco workshop.pdf Arizona Renewable Transmission Task Force BTA Response, submitted at 2009 Congestion Study San Francisco workshop.pdf

362

2009 National Electric Transmission Congestion Study - Chicago Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chicago Chicago Workshop 2009 National Electric Transmission Congestion Study - Chicago Workshop On September 17, 2008, DOE hosted a regional pre-study workshop in Chicago, IL to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 9-17-08 Congestion Workshop Agenda - Chicago, IL.pdf Transcript - 2009 National Electric Transmission Congestion Study Chicago Workshop.pdf Statement of Michael J. Kormos, PJM Interconnection, submitted at 2009 Congestion Study Chicago workshop.pdf More Documents & Publications Blackout 2003: Electric System Working Group Technical Conference - Comments and Recommendations 2009 National Electric Transmission Congestion Study - San Francisco

363

Federal Register Notice: Plan for Conduct of 2012 Electric Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice: Plan for Conduct of 2012 Electric Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study Federal Register Notice: Plan for Conduct of 2012 Electric Transmission Congestion Study November 10, 2011 - 1:42pm Addthis The Department has issued a Federal Register Notice initiating preparations for development of the 2012 National Electric Transmission Congestion Study. The Department is seeking comments on what publicly-available data and information should be considered, and what types of analysis should be performed to identify and understand the significance and character of transmission congestion. DOE will host four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the study. Addthis Related Articles 2012 Congestion Study Workshops to be Held in December; Agendas Now

364

Assumptions to the Annual Energy Outlook 2001 - Natural Gas Transmission  

Gasoline and Diesel Fuel Update (EIA)

Natural Gas Transmission and Distribution Module Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each forecast year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution network that links them. In addition, natural gas flow patterns are a function of the pattern in the previous year, coupled with the relative prices of gas supply options as translated to the represented market

365

2012 National Electric Transmission Congestion Study | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

2012 2012 National Electric Transmission Congestion Study 2012 National Electric Transmission Congestion Study 2012 National Electric Transmission Congestion Study The Department issued a Federal Register Notice initiating preparations for development of the 2012 National Electric Transmission Congestion Study. DOE hosted four regional pre-study workshops in early December 2011 to receive input and suggestions concerning the study. DOE appreciates the comments that various individuals and organizations submitted. The Department is preparing the 2012 Congestion Study now, and hosted three webinars in August 2012 to receive input and suggestions concerning the preliminary findings of the study. The presentation used in the webinars is now available. Later this year, DOE will release a draft of the study

366

2009 National Electric Transmission Congestion Study - San Francisco  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

San San Francisco Workshop 2009 National Electric Transmission Congestion Study - San Francisco Workshop On June 11, 2008, DOE hosted a regional pre-study workshop in San Francisco, CA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 6-11-08 Congestion Workshop Agenda - San Francisco, CA.pdf Transcript - 2009 National Electric Transmission Congestion Study San Francisco Workshop.pdf California Initiatives To Be Considered in DOE's 2009 Congestion Study, submitted at 2009 Congestion Study San Francisco workshop.pdf Arizona Renewable Transmission Task Force BTA Response, submitted at 2009 Congestion Study San Francisco workshop.pdf

367

Expansion of Facilities on the North Slope of Alaska in Time for the  

NLE Websites -- All DOE Office Websites (Extended Search)

Expansion of Facilities on the North Slope of Alaska in Time for the Expansion of Facilities on the North Slope of Alaska in Time for the International Polar Year Zak, Bernard Sandia National Laboratories Ivey, Mark Sandia National Laboratories Zirzow, Jeffrey Sandia National Laboratories Brower, Walter UIC Science Division ARM/NSA Ivanoff, James NSA Whiteman, Doug NSA/AAO Sassen, Kenneth University of Alaska Fairbanks Truffer-Moudra, Dana University of Alaska Fairbanks Category: Infrastructure & Outreach The International Polar Year (IPY; 2007-2008) will stimulate research in both polar regions, primarily focusing on the rapid climate-related changes occurring at high latitudes. In part in preparation for the IPY, facilities at the NSA ACRF are undergoing expansion. In addition, with funding through NOAA, Phase 1 of the planned $60M Barrow Global Climate Change Research

368

Electric utility capacity expansion and energy production models for energy policy analysis  

DOE Green Energy (OSTI)

This report describes electric utility capacity expansion and energy production models developed for energy policy analysis. The models use the same principles (life cycle cost minimization, least operating cost dispatching, and incorporation of outages and reserve margin) as comprehensive utility capacity planning tools, but are faster and simpler. The models were not designed for detailed utility capacity planning, but they can be used to accurately project trends on a regional level. Because they use the same principles as comprehensive utility capacity expansion planning tools, the models are more realistic than utility modules used in present policy analysis tools. They can be used to help forecast the effects energy policy options will have on future utility power generation capacity expansion trends and to help formulate a sound national energy strategy. The models make renewable energy source competition realistic by giving proper value to intermittent renewable and energy storage technologies, and by competing renewables against each other as well as against conventional technologies.

Aronson, E.; Edenburn, M.

1997-08-01T23:59:59.000Z

369

Expansion/De-expansion Tool to Quantify the Accuracy of Prostate Contours  

Science Conference Proceedings (OSTI)

Purpose: Accurate delineation of the prostate gland on computed tomography (CT) remains a persistent challenge and continues to introduce geometric uncertainty into the planning and delivery of external beam radiotherapy. We, therefore, developed an expansion/de-expansion tool to quantify the contour errors and determine the location of the deviations. Methods and Materials: A planning CT scan and magnetic resonance imaging scan were prospectively acquired for 10 patients with prostate cancer. The prostate glands were contoured by 3 independent observers using the CT data sets with instructions to contour the prostate without underestimation but to minimize overestimation. The standard prostate for each patient was defined using magnetic resonance imaging and CT on multiple planes. After registration of the CT and magnetic resonance imaging data sets, the CT-defined prostates were scored for accuracy. The contours were defined as ideal if they were within a 2.5-mm expansion of the standard without underestimation, acceptable if they were within a 5.0-mm expansion and a 2.5-mm de-expansion, and unacceptable if they extended >5.0 mm or underestimated the prostate by >2.5 mm. Results: A total of 636 CT slices were individually analyzed, with the vast majority scored as ideal or acceptable. However, none of the 30 prostate contour sets had all the contours scored as ideal or acceptable. For all 3 observers, the unacceptable contours were more likely from underestimation than overestimation of the prostate. The errors were more common at the base and apex than the mid-gland. Conclusions: The expansion/de-expansion tool allows for directed feedback on the location of contour deviations, as well as the determination of over- or underestimation of the prostate. This metric might help improve the accuracy of prostate contours.

Chung, Eugene; Stenmark, Matthew H. [Department of Radiation Oncology, University of Michigan, Ann Arbor, MI (United States); Evans, Cheryl [Department of Radiation Oncology, Providence Cancer Center, Novi, MI (United States); Narayana, Vrinda [Department of Radiation Oncology, University of Michigan, Ann Arbor, MI (United States); Department of Radiation Oncology, Providence Cancer Center, Novi, MI (United States); McLaughlin, Patrick W., E-mail: mclaughb@med.umich.edu [Department of Radiation Oncology, University of Michigan, Ann Arbor, MI (United States); Department of Radiation Oncology, Providence Cancer Center, Novi, MI (United States)

2012-05-01T23:59:59.000Z

370

Year-in-Review: 2012 Energy Infrastructure Events and Expansions...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Year-in-Review: 2012 Energy Infrastructure Events and Expansions (July 2013) Year-in-Review: 2012 Energy Infrastructure Events and Expansions (July 2013) The Year-in-Review (YIR):...

371

The Effectiveness of Query Expansion for Distributed Information Retrieval  

E-Print Network (OSTI)

The Effectiveness of Query Expansion for Distributed Information Retrieval Paul Ogilvie, Jamie information retrieval where complete collection information is available. One might expect that query expansion would then work for distributed information retrieval when complete collection information

Callan, Jamie

372

Transmission Planning | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

373

Scanning/Transmission Electron Microscopes  

NLE Websites -- All DOE Office Websites (Extended Search)

ScanningTransmission Electron Microscopes Nion UltraSTEM 60-100 dedicated aberration-corrected STEM for low- to mid-voltage operation and Enfina EELS Contact: Juan-Carlos Idrobo,...

374

National Electric Transmission Congestion Studies  

Energy.gov (U.S. Department of Energy (DOE))

Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission...

375

Managing Transmission Line Wood Structures  

Science Conference Proceedings (OSTI)

The objective of this project is to reduce capital cost by extending life expectancy of overhead transmission wood structures through inspection and assessment procedures and through aging mitigation techniques and tools.

2005-11-29T23:59:59.000Z

376

Transmission Structure Foundation Design Guide  

Science Conference Proceedings (OSTI)

This guide contains the most current and comprehensive information for the design of foundations for overhead line structures. The guide covers the complete transmission structure foundation design process from the subsurface investigations and design of the foundations, to the construction and inspection of the foundation. Reference documents to assist transmission structure foundation designers in the development of specifications such as for subsurface investigations and foundation construction ...

2012-11-28T23:59:59.000Z

377

Transmission Valuation and Cost Recovery  

Science Conference Proceedings (OSTI)

This technical update provides information on the status of the electric power industry regarding the economic valuation of transmission projects. Such valuations became critical with the introduction of economic transmission projects in the context of competitive electricity markets. Economic valuation is also becoming increasingly important for traditional reliability upgrades, because of the need for consistency in cost allocations between the two types of upgrades. The year 2005 has brought significa...

2005-12-22T23:59:59.000Z

378

Managing Transmission Line Wood Structures  

Science Conference Proceedings (OSTI)

Transmission and distribution infrastructures throughout the world are aging. As such, inspection, assessment, and maintenance of existing facilities have become increasingly important topics. This valuable reference provides an in-depth look at all facets of an inspection, assessment, and maintenance program for transmission line wood structures to help utilities develop and refine individual maintenance programs. The report is part of a broader multi-year effort by EPRI to develop a comprehensive handb...

2006-09-28T23:59:59.000Z

379

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

Science Conference Proceedings (OSTI)

California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

2008-07-01T23:59:59.000Z

380

Electric power transmission for a Hanford Nuclear Energy Center (HNEC)  

SciTech Connect

The original study of transmission for a Hanford Nuclear Energy Center (HNEC), which was completed in September 1975, was updated in June 1978. The present 1983 revision takes cognizance of recent changes in the electric power situation of the PNW with respect to: (1) forecasts of load growth, (2) the feasibility of early use of 1100 kV transmission, and (3) the narrowing opportunities for siting nuclear plants in the region. The purpose of this update is to explore and describe additions to the existing transmission system that would be necessary to accommodate three levels of generation at HNEC. Comparisons with a PNW system having new thermal generating capacity distributed throughout the marketing region are not made as was done in earlier versions.

Harty, H.; Dowis, W.J.

1983-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Propagation and Transmission of Alfven Waves in Rotating Magnetars  

E-Print Network (OSTI)

We study the propagation and transmission of Alfven waves in the context of cylindrical geometry. This approximates the polar cap region of aligned pulsar with strong magnetic fields. Non-propagating region appears in the presence of rotation. The displacement current further prevents the low frequency modes from propagating near the stellar surface. The transmission rates to the exterior through the surface are calculated. The rates increase with the frequency and the magnetic field strength. The transmission also depends on the helicity states of the waves, but the difference becomes small in the high frequency regime. We also point out the possibility of the spin-up by outgoing wave emission in the low frequency regime, if a certain condition holds.

Yasufumi Kojima; Taishi Okita

2004-06-25T23:59:59.000Z

382

Ultra-Long-Haul WDM transmission systems  

Science Conference Proceedings (OSTI)

This paper discusses the key transmission issues and design considerations for ultra-long-haul WDM systems. The key enabling technologies for the current generation of ultra-long-haul WDM transmission are described. Noise analysis and transmission modelling ...

Y. R. Zhou; A. Lord; S. R. Sikora

2002-10-01T23:59:59.000Z

383

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

case study of U.S. transmission line siting,” Energy Policy,Dual variable on transmission line k’s power flownetwork branches (transmission lines), it is possible to

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

384

A test of Taylor- and modified Taylor-expansion  

E-Print Network (OSTI)

We compare Taylor expansion and a modified variant of Taylor expansion, which incorporates features of the fugacity series, for expansions in the chemical potential around a zero-density lattice field theory. As a first test we apply both series to the cases of free fermions and free bosons. Convergence and other properties are analyzed.

Max Wilfling; Christof Gattringer

2013-11-28T23:59:59.000Z

385

Improving effectiveness of query expansion using information theoretic approach  

Science Conference Proceedings (OSTI)

Automatic Query expansion is a well-known method to improve the performance of information retrieval systems. In this paper we have suggested information theoretic measures to improve efficiency of co-occurrence based automatic query expansion. We have ... Keywords: automatic query expansion, candidate terms, kullback-leibler divergence, relevance feedback, term cooccurrence

Hazra Imran; Aditi Sharan

2010-06-01T23:59:59.000Z

386

Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AGENDA TUESDAY, FEBRUARY 7 MEETING ROOM-WINDOWS ROOM 8:30am - 8:50am WELCOME, INTRODUCTIONS AND OPENING REMARKS CONTINENTAL BREAKFAST WILL BE SERVED Tracey A. LeBeau, Director, DOE Office of Indian Energy Lamont Jackson, Representative, DOE Office of Electricity Delivery and Energy Reliability Introductions 8:50am - 9:10am FEDERAL TRANSMISSION DISCUSSION: TRANSMISSION EXPANSION IN THE WEST Timothy Meeks, Administrator, Western Area Power Administration 9:10am - 9:30am TRANSMISSION DEVELOPMENT IN THE PACIFIC: PERSPECTIVES FROM BONNEVILLE POWER ADMINISTRATION Bill Drummond, Deputy Administrator, Bonneville Power Administration 9:30am - 10:45am TRANSMISSION POLICY AND REGULATION PRIMER: OVERVIEW OF JURISDICTIONAL AUTHORITIES & CURRENT POLICY TRENDS

387

851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161  

E-Print Network (OSTI)

, the Western Electricity Coordinating Council (WECC) develops a transmission expansion plan, a reliability SUBJECT: Briefing on Coordination of Regional Power and Transmission Planning The Council is a primary the regional transmission system. Similarly, regional transmission planning entities must accurately represent

388

EIA-Assumptions to the Annual Energy Outlook - National Gas Transmission  

Gasoline and Diesel Fuel Update (EIA)

Natural Gas Transmission and Distribution Module Natural Gas Transmission and Distribution Module Assumptions to the Annual Energy Outlook 2007 National Gas Transmission and Distribution Module Figure 8. Natural Gas Transmission and Distribution Model Regions. Need help, contact the National Energy Information Center at 202-586-8800. The NEMS Natural Gas Transmission and Distribution Module (NGTDM) derives domestic natural gas production, wellhead and border prices, end-use prices, and flows of natural gas through the regional interstate network, for both a peak (December through March) and off peak period during each forecast year. These are derived by solving for the market equilibrium across the three main components of the natural gas market: the supply component, the demand component, and the transmission and distribution

389

The Impact of Transmission Pricing in Network Industries  

E-Print Network (OSTI)

. As transmission constraints 1For a description of the regional electricity markets in the U.S. compare, e.g., http://www.ferc.gov/. 2Compare, e.g., Ofgem (2010) and Redpoint Energy (2011) for the British discussion, Frontier (2011) for the discussion in Germany...

Ruderer, Dominic

2012-06-07T23:59:59.000Z

390

DOE Affirms National Interest Electric Transmission Corridor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations March 6, 2008 - 11:54am Addthis...

391

DOE National Interest Electric Transmission Corridors Conference  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Interest Electric Transmission Corridors Conference March 29, 2006 Hilton Garden Hotel Chicago, IL William H. Whitehead General Manager, Transmission Strategy PJM...

392

Electric Power Generation and Transmission (Iowa) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Generation and Transmission (Iowa) Electric Power Generation and Transmission (Iowa) < Back Eligibility Agricultural Industrial Investor-Owned Utility MunicipalPublic...

393

Interconnection-Wide Transmission Planning Initiative: Topic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency...

394

Transmission/Photo Gallery | Open Energy Information  

Open Energy Info (EERE)

Gallery < Transmission Jump to: navigation, search PhotoGalleryHeader.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada...

395

American Transmission Systems Inc | Open Energy Information  

Open Energy Info (EERE)

American Transmission Systems Inc Place Ohio Utility Id 56162 Utility Location Yes Ownership T NERC Location RFC NERC RFC Yes ISO MISO Yes Activity Transmission Yes References EIA...

396

Transmission/Permitting Atlas | Open Energy Information  

Open Energy Info (EERE)

Atlas < Transmission Jump to: navigation, search PermittingAtlasHeader.png Roadmap Compare States General Transmission Dashboard Permitting Atlas Compare States Arizona California...

397

Interconnection-Wide Transmission Planning Initiative: Topic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection...

398

EIS-0285: Transmission System Vegetation Management Program ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission System Vegetation Management Program June 23, 2000 EIS-0285: EPA Notice of Availability of the Final Environmental Impact Statement Transmission System Vegetation...

399

Casablanca Carlos American Electric Power Transmission Owner  

E-Print Network (OSTI)

(Facilitator) Chantal PJM Interconnection Not Applicable Horstmann John Dayton Power & Light Company (The) Transmission Owner Issermoyer John PPL Electric Utilities Corp. dba PPL Utilities Transmission Owner

Pjm Interconnection Llc; Teleconference Webex Participants; Firstenergy Solutions; Corp Transmission Owner; Boltz Jeff; Firstenergy Solutions; Corp Transmission Owner; Fecho Thomas; Indiana Michigan; Power Company; Transmission Owner; Patten Kevin; Company Transmission Owner

2012-01-01T23:59:59.000Z

400

Electric generating or transmission facility: determination of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric generating or transmission facility: determination of rate-making principles and treatment: procedure (Kansas) Electric generating or transmission facility: determination...

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Definition: Deferred Transmission Capacity Investments | Open...  

Open Energy Info (EERE)

transformers.1 Related Terms transmission lines, transformer, transmission line, sustainability References SmartGrid.gov 'Description of Benefits' An inl LikeLike UnlikeLike...

402

NREL: Transmission Grid Integration - Eastern Renewable Generation...  

NLE Websites -- All DOE Office Websites (Extended Search)

transmission? How does geographic diversity of wind reduce wind integration costs? How do offshore and onshore wind power compare? What transmission is needed to facilitate higher...

403

Definition: Firm Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Definition No reegle definition available. Also Known As Firm services Related Terms transmission lines, electricity generation, transmission line, smart grid References ...

404

Definition: Transmission Reliability | Open Energy Information  

Open Energy Info (EERE)

to ensure reliable system operation as system conditions change.1 Related Terms transmission lines, transfer capability, system, transmission line References Glossary...

405

Definition: Transmission Reliability Margin | Open Energy Information  

Open Energy Info (EERE)

system operation as system conditions change.1 Related Terms transfer capability, transmission lines, system, transmission line References Glossary of Terms Used in...

406

Definition: Transmission Constraint | Open Energy Information  

Open Energy Info (EERE)

that may be reached during normal or contingency system operations.1 Related Terms transmission lines, system, contingency, transmission line, element References ...

407

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

which is a cooperating agency in the project. The proposed project would: Rebuild aging and deteriorating transmission lines Reduce the number of linear miles of transmission...

408

Michigan Electric Transmission Company | Open Energy Information  

Open Energy Info (EERE)

Transmission Company Jump to: navigation, search Name Michigan Electric Transmission Company Place Michigan Utility Id 56163 Utility Location Yes Ownership T NERC RFC Yes ISO MISO...

409

DOE Transmission Capacity Report | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

410

NETL Regional University Alliance (NETL-RUA)  

NLE Websites -- All DOE Office Websites (Extended Search)

NETL-RUA GRID TECHNOLOGIES COLLABORATIVE NETL-RUA GRID TECHNOLOGIES COLLABORATIVE The U.S. electricity transmission system—the Grid—is in desperate need of expansion and updating. Improving the performance of the grid is a key component to improving energy efficiency, reliability, and power security; as well as for integrating a balanced clean-energy resource portfolio. The U.S. electricity transmission system—the Grid—is in desperate need of expansion and updating. Improving the performance of the grid is a key component to improving energy efficiency, reliability, and power security; as well as for integrating a balanced clean-energy resource portfolio. The U.S. electricity transmission system—the Grid—is in desperate need of expansion and updating. Improving the performance of the grid is a key component to improving energy efficiency, reliability, and power security; as well as for integrating a balanced clean-energy resource portfolio.

411

Specialty sorghums in direct-expansion extrusion  

E-Print Network (OSTI)

Whole-grain, high-fiber, or decorticated extrudates of excellent properties were made from white (nonwaxy, heterowaxy, waxy) sorghums or brown tannin-sorghums. Intact grains or prepared raw materials (cracked, cracked and sifted, decorticated) were extruded in a high-temperature, short-time (HTST) extruder. Waxy extrudates expanded less and were softer than those from nonwaxy or heterowaxy sorghums. Waxy extrudates had bigger air cells and thicker cell walls. Low moisture used in this type of extrusion and its interaction with the different amylose contents were the causes of the differences. Whole-grain extrudates from white sorghum had similar sensory acceptability to those from white decorticated sorghum. They had bland flavor and appearance and texture characteristic of whole-grain products. Extrudates from tannin sorghums were reddish brown due to their high levels of phytochemicals. The more expanded, softer products from whole-grain tannin sorghum were obtained when the grain was cracked and sifted. Decreased expansion was caused by higher levels of fiber and greater particle sizes (as in the extruded intact grain), and by reduced particle sizes (as in the cracked non-sifted grain). Expansion was correlated to smaller air cells with smooth walls. A simple enzymatic method was developed that isolates the 'gritty' particles from whole-grain/high-fiber extrudates, which closely correlated with expansion. Gritty particles were fiber (bran) plus undegraded starchy material. Whole grain/high fiber extrudates from white and tannin sorghums are an excellent option for food processors because of their excellent taste, appearance and texture.

Perez Gonzalez, Alejandro Jose

2005-12-01T23:59:59.000Z

412

Diamond Shamrock nears completion of major expansions  

SciTech Connect

With completion later this year of a second refined products line into Colorado, Diamond Shamrock Inc., San Antonio, will have added more than 600 miles of product and crude-oil pipeline on its system and expanded charge and production capacities at its two state-of-the-art refineries, all within 30 months. The projects aim at improving the company's ability to serve markets in the U.S. Southwest and increasing capacities and flexibility at its two refineries. The paper describes these projects under the following headings: new products service; another new line; and refineries, crude pipelines; Three Rivers expansion and Supplies for McKee.

True, W.R.

1993-05-24T23:59:59.000Z

413

Stability of Anisotropic Cylinder with Zero Expansion  

E-Print Network (OSTI)

We study the dynamical instability of anisotropic collapsing cylinder with the expansion-free condition, which generates vacuum cavity within fluid distribution. The perturbation scheme is applied to distinguish Newtonian, post-Newtonian and post-post Newtonian terms, which are used for constructing dynamical equation at Newtonian and post-Newtonian regimes. We analyze the role of pressure anisotropy and energy density inhomogeneity on the stability of collapsing cylinder. It turns out that stability of the cylinder depends upon these physical properties of the fluid, not on the stiffness of the fluid.

M. Sharif; M. Azam

2013-05-24T23:59:59.000Z

414

Stability of Anisotropic Cylinder with Zero Expansion  

E-Print Network (OSTI)

We study the dynamical instability of anisotropic collapsing cylinder with the expansion-free condition, which generates vacuum cavity within fluid distribution. The perturbation scheme is applied to distinguish Newtonian, post-Newtonian and post-post Newtonian terms, which are used for constructing dynamical equation at Newtonian and post-Newtonian regimes. We analyze the role of pressure anisotropy and energy density inhomogeneity on the stability of collapsing cylinder. It turns out that stability of the cylinder depends upon these physical properties of the fluid, not on the stiffness of the fluid.

Sharif, M

2013-01-01T23:59:59.000Z

415

The derivative expansion of the renormalization group  

E-Print Network (OSTI)

By writing the flow equations for the continuum Legendre effective action (a.k.a. Helmholtz free energy) with respect to a particular form of smooth cutoff, and performing a derivative expansion up to some maximum order, a set of differential equations are obtained which at FPs (Fixed Points) reduce to non-linear eigenvalue equations for the anomalous scaling dimension $\\eta$. Illustrating this by expanding (single component) scalar field theory, in two, three and four dimensions, up to second order in derivatives, we show that the method is a powerful and robust means of discovering and quantifying non-perturbative continuum limits (continuous phase transitions).

Tim R. Morris

1994-11-25T23:59:59.000Z

416

NDN, volume transmission, and self-organization in brain dynamics  

E-Print Network (OSTI)

NDN, VOLUME TRANSMISSION, AND SELF- ORGANIZATION IN BRAINThese systems instantiate volume transmission bynonsynaptic diffusion transmission, in concert with the

Freeman, Walter J III

2005-01-01T23:59:59.000Z

417

Definition: Non-Firm Transmission Service | Open Energy Information  

Open Energy Info (EERE)

available. Also Known As Interruptible Load or Interruptible Demand Related Terms transmission lines, electricity generation, transmission line, firm transmission service,...

418

APEX user`s guide - (Argonne production, expansion, and exchange model for electrical systems), version 3.0  

Science Conference Proceedings (OSTI)

This report describes operating procedures and background documentation for the Argonne Production, Expansion, and Exchange Model for Electrical Systems (APEX). This modeling system was developed to provide the U.S. Department of Energy, Division of Fossil Energy, Office of Coal and Electricity with in-house capabilities for addressing policy options that affect electrical utilities. To meet this objective, Argonne National Laboratory developed a menu-driven programming package that enables the user to develop and conduct simulations of production costs, system reliability, spot market network flows, and optimal system capacity expansion. The APEX system consists of three basic simulation components, supported by various databases and data management software. The components include (1) the investigation of Costs and Reliability in Utility Systems (ICARUS) model, (2) the Spot Market Network (SMN) model, and (3) the Production and Capacity Expansion (PACE) model. The ICARUS model provides generating-unit-level production-cost and reliability simulations with explicit recognition of planned and unplanned outages. The SMN model addresses optimal network flows with recognition of marginal costs, wheeling charges, and transmission constraints. The PACE model determines long-term (e.g., longer than 10 years) capacity expansion schedules on the basis of candidate expansion technologies and load growth estimates. In addition, the Automated Data Assembly Package (ADAP) and case management features simplify user-input requirements. The ADAP, ICARUS, and SMN modules are described in detail. The PACE module is expected to be addressed in a future publication.

VanKuiken, J.C.; Veselka, T.D.; Guziel, K.A.; Blodgett, D.W.; Hamilton, S.; Kavicky, J.A.; Koritarov, V.S.; North, M.J.; Novickas, A.A.; Paprockas, K.R. [and others

1994-11-01T23:59:59.000Z

419

Reading the Tea Leaves: How Utilities in the West Are Managing Carbon Regulatory Risk in their Resource Plans  

E-Print Network (OSTI)

and transmission expansion, availability of federaland transmission expansion, continued availability ofand transmission expansion, continued availability of

Barbose, Galen

2008-01-01T23:59:59.000Z

420

Is Hubble's Expansion due to Dark Energy  

E-Print Network (OSTI)

{\\it The universe is expanding} is known (through Galaxy observations) since 1929 through Hubble's discovery ($V = H D$). Recently in 1999, it is found (through Supernovae observations) that the universe is not simply expanding but is accelerating too. We, however, hardly know only $4\\%$ of the universe. The Wilkinson Microwave Anisotropy Probe (WMAP) satellite observational data suggest $73\\%$ content of the universe in the form of dark-energy, $23\\%$ in the form of non-baryonic dark-matter and the rest $4\\%$ in the form of the usual baryonic matter. The acceleration of the universe is ascribed to this dark-energy with bizarre properties (repulsive-gravity). The question is that whether Hubble's expansion is just due to the shock of big-bang & inflation or it is due to the repulsive-gravity of dark-energy? Now, it is believed to be due to dark-energy, say, by re-introducing the once-discarded cosmological-constant $\\Lambda$. In the present paper, it is shown that `the formula for acceleration due to dark-energy' is (almost) exactly of same-form as `the acceleration formula from the Hubble's law'. Hence, it is concluded that: yes, `indeed it is the dark-energy responsible for the Hubble's expansion too, in-addition to the current on-going acceleration of the universe'.

R. C. Gupta; Anirudh Pradhan

2010-10-19T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Does More international transmission capacity increase competition in the Belgian electricity market?  

SciTech Connect

From a national market perspective, taking transmission capacity into account reduces current concentration measures, although they remain fairly high even after substantial capacity increases. From an international perspective, a more efficient use of current transmission capacity by coupling regional markets can increase competition. That suggests it may not be appropriate to assess market concentration using national market shares. (author)

Kuepper, Gerd; Delarue, Erik; Delvaux, Bram; Meeus, Leonardo; Bekaert, David; Willems, Bert; Proost, Stef; D'haeseleer, William; Deketelaere, Kurt; Belmans, Ronnie

2009-01-15T23:59:59.000Z

422

DOE Transmission System Integration Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Heyeck, AEP, Sr. Vice President, Transmission Heyeck, AEP, Sr. Vice President, Transmission and Chair, EPRI Power Delivery & Utilization Sector Council November 01-02, 2012 DoubleTree Hotel, Crystal City Washington D.C. DOE Transmission System Integration Workshop 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. Near-Zero Emissions Long-Term Operations Renewable Integration Water Management Electric Vehicles Demand Response & Efficiency Renewable Energy Energy Storage Sensors & Control Cyber Security Supply = Demand The Power System Supply to Demand Requires a full portfolio of innovative technologies. Tomorrow's Power System One size does not fit all 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. Grid Transformation to Ensure Reliability, Efficiency, Resiliency and Security

423

The Development of HVDC Transmission System  

Science Conference Proceedings (OSTI)

The ever increasing process of high-voltage high-power fully controlled semiconductor technology has promoted the flexible ac transmission systems ahead significantly. Developments advance both the HVDC power transmission and the flexible ac transmission ... Keywords: converters station, HVDC transmission systems, power electronics

Yang Zhou; Dao Zhuojiang; Yu Fenwang

2012-07-01T23:59:59.000Z

424

Transmission Rights and Market Power James Bushnell  

E-Print Network (OSTI)

of the transmission grid can advantage some competitors at the expense of others. In electricity markets around control of transmission paths. In electricity markets such as California's, even financial transmissionPWP-062 Transmission Rights and Market Power James Bushnell April, 1999 This paper is part

California at Berkeley. University of

425

Transmission characteristics of circular metallic waveguides for terahertz radiation  

SciTech Connect

Transmission characteristics of oversized circular metallic waveguides excited by linearly polarised Gaussian laser beams in the terahertz range (4 - 28 THz) are studied theoretically and experimentally. Calculating the transmission characteristics, we have determined the conditions of applicability of the method of the eigenoscillations in the approximations of a real metal by an ideal metal or dielectric, depending on the transmitted radiation frequency. The existence of the transition region is established in the behaviour of the electrodynamic properties of metallic waveguides in the frequency range of 7.5 - 15 THz.

Volodenko, A V; Gurin, O V; Degtyarev, A V; Maslov, Vyacheslav A; Svich, V A; Senyuta, V S; Topkov, A N [V.N. Karazin Kharkov National University, Kharkov (Ukraine)

2011-09-30T23:59:59.000Z

426

Energy Transmission by Barotropic Rossby Waves across Large-Scale Topography  

Science Conference Proceedings (OSTI)

An analytical study investigates the energy transmission by free, barotropic, linear Rossby waves across a large scale bottom topography when topographic and beta-effects have the same order of magnitude. In open ocean regions which are not ...

Bernard Barnier

1984-02-01T23:59:59.000Z

427

Investigation of Atmospheric Transmission in the Crimea (Ukraine) in the Twentieth Century  

Science Conference Proceedings (OSTI)

Systematic monitoring of spectral atmospheric transmission (SAT) has been conducted in the Crimea (a peninsula in Ukraine) since 1996. A sun-tracking solar photometer that records signals in five spectral regions selected by interference filters ...

E. I. Terez; G. A. Terez

2002-10-01T23:59:59.000Z

428

Transmission System Reliability Performance Metrics Requirements  

Science Conference Proceedings (OSTI)

Transmission availability has become the significant indicator of overall transmission system operational health, due to increased utilization of the transmission system, growth of deregulated energy wholesale markets, and decreased investment in new transmission assets. Availability trends reflect the increasing dependence upon transmission assets from a technical and market perspective. Presently availability metrics lack comparability due to the non-standardization of underlying data collection method...

2003-12-12T23:59:59.000Z

429

Early expansion in exploding multiple wire arrays  

Science Conference Proceedings (OSTI)

A simple model is developed for the initial stage (blow-off and the onset of pinching) of a multiple exploded wire array. With obvious modifications the model can also be applied to single wires or other self-pinched plasma columns. Each wire in the array is modeled as a plasma cylinder undergoing self-similar radial motion, and the whole array is coupled self-consistently to an external circuit. The plasma expands initially; the onset of self-pinch is shown to be coincident with the plasma conductivity reaching a value large enough for skin effect to occur. The model is run for a variety of system parameters, and the choice of machine and wire parameters to attain particular objectives (e.g., rapid current rise, limited wire expansion, etc.) is discussed.

Bloomberg, H.W.; Lampe, M.; Colombant, D.G.

1980-10-01T23:59:59.000Z

430

Derivative Expansion of the Exact Renormalization Group  

E-Print Network (OSTI)

The functional flow equations for the Legendre effective action, with respect to changes in a smooth cutoff, are approximated by a derivative expansion; no other approximation is made. This results in a set of coupled non-linear differential equations. The corresponding differential equations for a fixed point action have at most a countable number of solutions that are well defined for all values of the field. We apply the technique to the fixed points of one-component real scalar field theory in three dimensions. Only two non-singular solutions are found: the gaussian fixed point and an approximation to the Wilson fixed point. The latter is used to compute critical exponents, by carrying the approximation to second order. The results appear to converge rapidly.

Tim R. Morris

1994-03-22T23:59:59.000Z

431

Underground Transmission Systems Reference Book  

Science Conference Proceedings (OSTI)

The Underground Transmission Systems Reference Book covers all stages of cable system design and operation, from initial planning studies to failure analysis. It contains contributions from many of the industry's experts and represents practices from all parts of the United States.

1993-03-01T23:59:59.000Z

432

Power superconducting power transmission cable  

DOE Patents (OSTI)

The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

Ashworth, Stephen P. (Cambridge, GB)

2003-01-01T23:59:59.000Z

433

Transmission System SQRA Assessment Methods  

Science Conference Proceedings (OSTI)

Market conditions and increasingly stringent regulatory requirements have focused attention on metrics that quantify the Security, Quality, Reliability, and Availability (SQRA) of transmission systems. This report summarizes the state-of-the-art in performance metrics, provides four case studies of their use, and discusses future trends in reliability metrics, congestion metrics, and benchmarking.

2009-07-31T23:59:59.000Z

434

Transmission Access Charge Informational Filing  

E-Print Network (OSTI)

of any new Participating Transmission Owner (“Participating TO”) during the proceeding six months or (2) changes to Transmission Revenue Requirements of any of the Participating TOs. 1 Because the Access Charges are determined through a formula rate mechanism, these semi-annual adjustments take place automatically. In the enclosed informational filing, the ISO is providing notice regarding the updated Access Charges that reflect the charges that will be in effect beginning January 1, 2002 in accordance with the formula rate. The adjusted charges are based on the modified Transmission Revenue Requirements, both High Voltage and Low Voltage as a result of: (1) the Offer of Settlement accepted by the Commission in Pacific Gas & Electric Company’s (“PG&E”) Docket No. ER01-66-000, (2) San Diego Gas and Electric Company’s supplemental surcharge accepted, subject to refund, in Docket No. ER01-3074-000, and (3) the annual adjustment to the Transmission Revenue Balancing Account (“TRBA”) of the Participating TOs. 1 Capitalized terms not otherwise defined herein are defined in the Master Definitions

unknown authors

2001-01-01T23:59:59.000Z

435

Energy Infrastructure Events and Expansions Year-in-Review 2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Infrastructure Events and Expansions Year-in-Review 2011 Infrastructure Events and Expansions Year-in-Review 2011 Energy Infrastructure Events and Expansions Year-in-Review 2011 The 2011 Year-in-Review (YIR) provides a summary of significant energy disruptions and infrastructure changes that occurred in the United States throughout 2011. The focus is on the United States, but international events that impacted the United States are also reported. The 2011 YIR is based primarily on information reported in the Energy Assurance Daily (EAD) between January 1, 2011 and December 31, 2011. Energy Infrastructure Events and Expansions Year-in-Review 2011.pdf More Documents & Publications Year-in-Review: 2012 Energy Infrastructure Events and Expansions (July 2013) Energy Infrastructure Events and Expansions Year-in-Review 2010

436

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

5, DOE/EIA-M062(2005) (Washington, DC, 2005). 5, DOE/EIA-M062(2005) (Washington, DC, 2005). Energy Information Administration/Assumptions to the Annual Energy Outlook 2006 101 Primary Flows Secondary Flows Pipeline Border Crossing Specific LNG Terminals Primary Flows Secondary Flows Pipeline Border Crossing Specific LNG Terminals Generic LNG Terminals Alaska Alaska MacKenzie W. Canada E. Canada Canada Offshore & LNG Pacific (9) Mountain (8) CA (12) AZ/NM (11) W. South Central (7) E. South Central (6) W. North Central (4) E. North Central (3) Mid Atlantic (2) New Engl. (1) S. Atlantic (5) FL (10) Bahamas Mexico Figure 8. Natural Gas Transmission and Distribution Model Regions Source: Energy Information Administration, Office of Integrated Analysis and Forecasting Report #:DOE/EIA-0554(2006) Release date: March 2006 Next release date: March 2007

437

2012 National Electric Transmission Congestion Study - St. Louis Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

St. Louis St. Louis Workshop 2012 National Electric Transmission Congestion Study - St. Louis Workshop On December 8, 2011, DOE hosted a regional pre-study workshop in St. Louis, MO to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below. National Electric Transmission Congestion Study 2012 Eastern Workshops 12-08-11 Congestion Workshop Agenda - St Louis (final).pdf Introduction by David Meyer, DOE Presentation by Kevin Gunn, MO PSC.pdf Presentation by Jerry Lein, ND PSC.pdf Presentation by Tom Sloan, KS Legislature.pdf Presentation by Maureen Borkowski, Ameren.pdf Presentation by Laureen L Ross McCalib, Great River Energy.pdf Presentation by Dale Osborn, MISO.pdf

438

2009 National Electric Transmission Congestion Study - Oklahoma City  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oklahoma Oklahoma City Workshop 2009 National Electric Transmission Congestion Study - Oklahoma City Workshop On June 18, 2008, DOE hosted a regional pre-study workshop in Oklahoma City, OK to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda, full transcript, and documents submitted for consideration for the 2009 study are available below. 6-18-08 Congestion Workshop Agenda - Oklahoma City, OK.pdf Transcript - 2009 National Electric Transmission Congestion Study Oklahoma City Workshop.pdf Independent Market Monitor Monthly Market Metrics Report, May 2008, submitted at 2009 Congestion Study Oklahoma City workshop.pdf Comments of the Missouri Public Service Missouri Commission, submitted at 2009 Congestion Study Oklahoma City workshop.pdf

439

2012 National Electric Transmission Congestion Study - Portland Workshop |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portland Portland Workshop 2012 National Electric Transmission Congestion Study - Portland Workshop On December 13, 2011, DOE hosted a regional pre-study workshop in Portland, OR to receive input and suggestions concerning the 2012 National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below. National Electric Transmission Congestion Study 2012 Western Workshops.pdf 12-13-11 CONGESTION WORKSHOP AGENDA - PORTLAND (final).pdf Introduction by David Meyer, DOE .pdf Presentation by Steve Oxley, WY PSC.pdf Presentation by Rich Bayless, NTTG.pdf Presentation by Susan Henderson, Xcel Energy.pdf Presentation by Marv Landauer, ColumbiaGrid.pdf Presentation by Steve Metague, PGE.pdf Presentation by Bradley Nickell, WECC.pdf

440

Remarks for DOE Workshop Regarding Transmission Congestion Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2011 6, 2011 Remarks for DOE Workshop Regarding Transmission Congestion Study Thank you for the opportunity to speak today. I am Ed Finley and I chair the North Carolina Utilities Commission. By way of background, with the exception of a very small portion of the State - the northeast - North Carolina does not participate in a regional transmission organization, or RTO, and our electric utilities remain vertically integrated. North Carolina's electric utilities are required to plan their systems on a least-cost, integrated basis, considering generation and transmission costs, as well as energy efficiency and demand-side management. There is no retail competition in North Carolina. Regulation in North Carolina follows the "command and control" model. The NC Commission must

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Thermal Expansion of Aluminum and Some Aluminum Alloys  

Science Conference Proceedings (OSTI)

... Am. Inst. Mining Met. Engrs., Inst. Metals Diy. 104, 308 (1933). 13] P. Hidnert and W. Souder, Thermal expansion of solids, NBS Circular 486 (1950). ...

2006-03-29T23:59:59.000Z

442

Prevention of Compressor Short Cycling in Direct-Expansion (DX...  

NLE Websites -- All DOE Office Websites (Extended Search)

Units, Part 1: Theoretical Analysis and Simulation Title Prevention of Compressor Short Cycling in Direct-Expansion (DX) Rooftop Units, Part 1: Theoretical Analysis and Simulation...

443

Prevention of Compressor Short Cycling in Direct-Expansion (DX...  

NLE Websites -- All DOE Office Websites (Extended Search)

Units- Part 2: Field Investigation Title Prevention of Compressor Short Cycling in Direct-Expansion (DX) Rooftop Units- Part 2: Field Investigation Publication Type Journal Article...

444

Energy Recovery During Expansion of Compressed Gas Using Power...  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery During Expansion of Compressed Gas Using Power Plant Low-Quality Heat Sources Opportunity The Department of Energy's National Energy Technology Laboratory (NETL) is...

445

Cardiorenal-endocrine dynamics during and following volume expansion  

SciTech Connect

The relationship between atrial pressure, atrial natriuretic peptide (ANP), the renin-angiotensin-aldosterone system, and renal hemodynamic and excretory function was examined during and following acute 10% body weight saline volume expansion and measurements were made at 3.3, 6.6, and 10% body weight volume expansion in pentobarbital anesthetized dogs. Right atrial pressure (RAP), pulmonary capillary wedge pressure (PCWP), fractional excretion of Na (FE/sub Na/), and ANP all increased in parallel during volume expansion. Plasma renin activity (PRA) and aldosterone decreased in parallel during 10% volume expansion. ANP, PRA and aldosterone were measured by radioimmunoassay. Following 10% volume expansion, saline was infused at the peak urine flow rate to maintain peak volume expansion. Despite continued saline infusion, RAP, PCWP, and ANP decreased in parallel. In contrast, FE/sub Na/ remained increased, and aldosterone and PRA remained depressed. These studies demonstrate that atrial pressures, ANP, and FE/sub Na/ increase in parallel during volume expansion; this suggests a role for ANP in modulating acute atrial volume overload. During stable volume expansion periods, however, despite a decrease in ANP levels, Na excretion remains elevated, suggesting that non-ANP mechanisms may be important in maintaining natriuresis during stable volume expansion.

Zimmerman, R.S.; Edwards, B.S.; Schwab, T.R.; Heublein, D.M.; Burnett, J.C. Jr.

1987-02-01T23:59:59.000Z

446

Oil Production Capacity Expansion Costs for the Persian Gulf  

U.S. Energy Information Administration (EIA)

DOE/EIA-TR/0606 Distribution Category UC-950 Oil Production Capacity Expansion Costs For The Persian Gulf January 1996 Energy Information Administration

447

FOA aimed at growing expansive database of Renewable Energy and...  

Open Energy Info (EERE)

FOA aimed at growing expansive database of Renewable Energy and Energy Efficiency Incentives and Policies Home > Groups > Utility Rate Graham7781's picture Submitted by...

448

EA-1763: Geothermal Expansion to Boise State University, City...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sites Power Marketing Administration Other Agencies You are here Home EA-1763: Geothermal Expansion to Boise State University, City of Boise, Boise, Idaho EA-1763: Geothermal...

449

Development of a New Controlled Thermal Expansion Superalloy ...  

Science Conference Proceedings (OSTI)

Aerospace Structural Metals Handbook, (1991) Vol 4, Code 4103, page 36. 9. D. F. Smith and J. S. Smith, “A Silicon-Containing, Low-Expansion Alloy with.

450

Shearing expansion-free spherical anisotropic fluid evolution  

Science Conference Proceedings (OSTI)

Spherically symmetric expansion-free distributions are systematically studied. The entire set of field equations and junction conditions are presented for a general distribution of dissipative anisotropic fluid (principal stresses unequal), and the expansion-free condition is integrated. In order to understand the physical meaning of expansion-free motion, two different definitions for the radial velocity of a fluid element are discussed. It is shown that the appearance of a cavity is inevitable in the expansion-free evolution. The nondissipative case is considered in detail, and the Skripkin model is recovered.

Herrera, L. [Escuela de Fisica, Facultad de Ciencias, Universidad Central de Venezuela, Caracas (Venezuela, Bolivarian Republic of); Santos, N. O. [School of Mathematical Sciences, Queen Mary, University of London, London E1 4NS (United Kingdom); Laboratorio Nacional de Computacao Cientifica, 25651-070 Petropolis RJ (Brazil); Wang Anzhong [GCAP-CASPER, Department of Physics, Baylor University, Waco, Texas 76798-7316 (United States); Department of Theoretical Physics, State University of Rio de Janeiro, RJ (Brazil)

2008-10-15T23:59:59.000Z

451

Expansion of the Volpentest Hazardous Materials Management and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment Expansion of the Volpentest Hazardous Materials Management and Emergency Response Training and Education Center, Hanford Site, Richland, Washington U.S....

452

Definition: Network Integration Transmission Service | Open Energy  

Open Energy Info (EERE)

Network Integration Transmission Service Network Integration Transmission Service Jump to: navigation, search Dictionary.png Network Integration Transmission Service Service that allows an electric transmission customer to integrate, plan, economically dispatch and regulate its network reserves in a manner comparable to that in which the Transmission Owner serves Native Load customers.[1] Related Terms transmission lines, transmission customer, transmission line, native load, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Network_Integration_Transmission_Service&oldid=502560" Categories: Definitions

453

EIS-0377: Big Stone II Power Plant and Transmission Project | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Big Stone II Power Plant and Transmission Project 7: Big Stone II Power Plant and Transmission Project EIS-0377: Big Stone II Power Plant and Transmission Project SUMMARY A systems study was carried out to identify the most appropriate locations to interconnect the proposed Big Stone II power plant to the regional utility grid. The study also identified transmission line and substation upgrades and modifications that would be required to support the addition of 600 MW of capacity within the system. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 24, 2009 EIS-0377: Record of Decision Big Stone II Power Plant and Transmission Project June 1, 2009 EIS-0377: Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project October 26, 2007 EIS-0377: Supplemental Draft Environmental Impact Statement

454

Middle East: Output expansions boost drilling  

SciTech Connect

Iraqi exports may return to the market in limited fashion, but none of the region`s producers seems particularly concerned. They believe that global oil demand is rising fast enough to justify their additions to productive capacity. The paper discusses exploration, drilling and development, and production in Saudi Arabia, Kuwait, the Neutral Zone, Abu Dhabi, Dubai, Oman, Iran, Iraq, Yemen, Qatar, Syria, Turkey, and Sharjah. The paper also briefly mentions activities in Bahrain, Israel, Jordan, and Ras al Khaimah.

NONE

1996-08-01T23:59:59.000Z

455

NREL: Transmission Grid Integration - Webinars  

NLE Websites -- All DOE Office Websites (Extended Search)

Webinars Webinars Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL periodically offers webinars on transmission grid integration topics to provide insight into its research. Explore the resources below to learn more. Upcoming Webinars Please check back. Details on future meetings and workshops will be posted as they are available. Past Webinars Results from The Western Wind and Solar Integration Study Phase 2: An examination of how wind and solar power affect operations, costs, and emissions from fossil-fueled generators Wednesday, September 25, 2013 at 12:00 EDT (10:00 MDT) The Western Wind and Solar Integration Study Phase 2 (WWSIS-2), launched in 2011, examines the potential impacts of up to 33% wind and solar energy

456

DOE Electricity Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSMISSION SYSTEM WORKSHOP TRANSMISSION SYSTEM WORKSHOP Mapping Challenges and Opportunities to Help Guide DOE R&D Investments over the Next Five Years DoubleTree Crystal City, 300 Army Navy Drive, Arlington, VA November 1-2, 2012 AGENDA Thursday, November 1, 2012 8:00-8:10 Welcome and Kickoff David Sandalow, Acting Undersecretary of Energy 8:10-8:30 Introduction to the Grid Tech Team (GTT), Vision, and Framework Distribution Workshop Summary Dr. Anjan Bose, Grid Tech Team Lead 8:30-8:50 OE Vision, Activities, and Issues Patricia A. Hoffman, Assistant Secretary for the Office of Electricity Delivery and Energy Reliability (OE) 8:50-9:10 EERE Vision, Activities, and Issues Dr. David Danielson, Assistant Secretary for the Office of Energy Efficiency and Renewable Energy (EERE)

457

transmission | OpenEI Community  

Open Energy Info (EERE)

21 21 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235321 Varnish cache server transmission Home Kyoung's picture Submitted by Kyoung(155) Contributor 12 November, 2012 - 09:17 Legal Reviews are Underway BHFS Legal review permitting power plant roadmap transmission The legal review of the Regulatory Roadmap flowcharts and supporting content is well underway and will continue for the next several months with our legal team at [www.bhfs.com Brownstein Hyatt Farber and Schreck]. The

458

Pipeline expansion to aid East, Midwest  

SciTech Connect

Texas Eastern Transmission Corp.'s expanded capacity of 25,000 barrels per day will benefit Midwestern and Eastern industries and utilities by adding a parallel pipeline to a storage terminal in Arkansas. Confidence in the market potential of liquid petroleum gas (LPG) is reflected in this move and in predictions that increased imports of LPG will reach 655,000 barrels per day in 1980 compared to 34,000 in 1976. Industries are expected to use butane interchangeably with propane in the future. Regulations governing the future of the LPG market require competitive pricing, long-term supply and shipping agreements, and the use of foreign LPG as a feedstock for synthetic natural gas if LPG use is to continue expanding. (DCK)

Crawford, E.

1977-06-06T23:59:59.000Z

459

Transmission Planning Process and Opportunities for Utility-Scale Solar Engagement within the Western Electricity Coordinating Council (WECC)  

DOE Green Energy (OSTI)

This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. Market barriers unrelated to technology often limit the expansion of utility-scale solar power, even in areas with exceptional resource potential. Many of these non-technical barriers have to do with policy, regulation, and planning, and hardly ever do they resolve themselves in a timely fashion. In most cases, pre-emptive intervention by interested stakeholders is the easiest way to remove/address such barriers, but it requires knowing how to navigate the institutional waters of the relevant agencies and boards. This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. It focuses on the Western Interconnection (WI), primarily because the quality of solar resources in the Southwest makes utility-scale concentrating solar power (CSP) and photovoltaics (PV) economically feasible, and because the relevant institutions have evolved in a way that has opened up opportunities for removing non-technical market barriers. Developers will find in this report a high-level field manual to identify the venues for mitigating and possibly eliminating systemic market obstacles and ensuring that the economic playing field is reasonably level. Project-specific issues such as siting for transmission and generation resources are beyond the scope of this report. Instead, the aim is to examine issues that pervasively affect all utility-scale PV and CSP in the region regardless of where the project may be. While the focus is on the WI, many of the institutions described here also have their counterparts in the Eastern and the Texas interconnections. Specifically, this report suggests a number of critical engagement points relating to generation and transmission planning.

Hein, J.; Hurlbut, D.; Milligan, M.; Coles, L.; Green, B.

2011-11-01T23:59:59.000Z

460

Midwest Transmission Workshop II Summary  

DOE Green Energy (OSTI)

OAK-B135 After introductions of all participants, Abby Arnold, RESOLVE, reviewed the purpose of the meeting and the agenda. The purpose of the workshop was to share the results of the Midwest Independent System Operator (MISO) scenario development for wind and other fuel sources and the corresponding implications for transmission throughout the MISO control area. The workshop agenda is included in Attachment A.

Kevin Bryan

2002-12-05T23:59:59.000Z

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Guide for Transmission Line Grounding  

Science Conference Proceedings (OSTI)

Electrical utilities have a duty to provide effective grounding for managing steady-state and fault currents, whether near a large generating station or at a remote distribution pole ground. For transmission lines, this imperative is usually met with investment in overhead ground wires and grounding electrodes. Effective grounding at each tower improves reliability8212by providing low path impedance to lightning strokes8212and contributes to safety. However, the fundamental physical parameters in ground ...

2007-12-20T23:59:59.000Z

462

High current pulse transmission cable  

DOE Patents (OSTI)

This invention is comprised of a transmission cable for carrying high current pulses in which an even numbered plurality of electrical conductors surrounds a central ground conductor. Each electrical conductor is connected so that it at any instant in time it will carry current of opposite polarity to the polarity carried by adjacent conductors. This arrangement cancels practically all of the external fields generated by current in the conductors.

Parsons, W.M.

1990-09-28T23:59:59.000Z

463

Flexible and Strategic Transmission Planning  

Science Conference Proceedings (OSTI)

This update describes two separate but related planning frameworks developed for this project: 1) balancing of reliability and economics in transmission planning and 2) consideration of the need for operational flexibility in planning. Projects that improve reliability can also improve economics, and vice versa. The challenge is in achieving the reliability goals with as much economic benefit as possible, in other words, balancing the reliability and economic goals without compromising either. A method o...

2011-12-22T23:59:59.000Z

464

West Foster Creek Expansion Project 2007 HEP Report.  

DOE Green Energy (OSTI)

During April and May 2007, the Columbia Basin Fish and Wildlife Authority's (CBFWA) Regional HEP Team (RHT) conducted baseline Habitat Evaluation Procedures (HEP) (USFWS 1980, 1980a) analyses on five parcels collectively designated the West Foster Creek Expansion Project (3,756.48 acres). The purpose of the HEP analyses was to document extant habitat conditions and to determine how many baseline/protection habitat units (HUs) to credit Bonneville Power Administration (BPA) for funding maintenance and enhancement activities on project lands as partial mitigation for habitat losses associated with construction of Grand Coulee and Chief Joseph Dams. HEP evaluation models included mule deer (Odocoileus hemionus), western meadowlark (Sturnella neglecta), sharp-tailed grouse, (Tympanuchus phasianellus), Bobcat (Lynx rufus), mink (Neovison vison), mallard (Anas platyrhynchos), and black-capped chickadee (Parus atricapillus). Combined 2007 baseline HEP results show that 4,946.44 habitat units were generated on 3,756.48 acres (1.32 HUs per acre). HEP results/habitat conditions were generally similar for like cover types at all sites. Unlike crediting of habitat units (HUs) on other WDFW owned lands, Bonneville Power Administration received full credit for HUs generated on these sites.

Ashley, Paul R.

2008-02-01T23:59:59.000Z

465

Coiled transmission line pulse generators  

DOE Patents (OSTI)

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

466

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

in calculating the unit cost of wind energy transmissionimpacts of the cost of transmission for wind energy. Only inj = Transmission cost per unit of wind energy weighted by

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

467

[Feedback control mechanisms of plant cell expansion  

DOE Green Energy (OSTI)

We have generated considerable evidence for the significance of wall stress relaxation in the control of plant growth and found that several agents (gibberellin, light, genetic loci for dwarf stature) influence growth rate via alteration of wall relaxation. We have refined our methods for measuring wall relaxation and, moreover, have found that wall relaxation properties bear only a distance relationship to wall mechanical properties. We have garnered novel insights into the nature of cell expansion mechanisms by analyzing spontaneous fluctuations of plant growth rate in seedlings. These experiments involved the application of mathematical techniques for analyzing growth rate fluctuations and the development of new instrumentation for measuring and forcing plant growth in a controlled fashion. These studies conclude that growth rate fluctuations generated by the plant as consequence of a feedback control system. This conclusion has important implications for the nature of wall loosening processes and demands a different framework for thinking about growth control. It also implies the existence of a growth rate sensor.

Cosgrove, D.J.

1992-01-01T23:59:59.000Z

468

Hayden-Blue River 345-kV transmission line project, Colorado  

SciTech Connect

Tri-State Generation and Transmission Association, Inc., Colorado-Ute Electric Association, Inc., Platte River Power Authority, and Western Area Power Administration propose to construct and operate approximately 90 miles of 345-kilovolt (kV) transmission line between Hayden and the Blue River Valley in Colorado. The project would involve expansion of existing substation facilities at Hayden and construction of two new substations. The line would be operated at 230 kV initially. Estimated cost of the project is $37.8 million. The new line and substation facilities would provide a backup transmission path, satisfy the long-term needs in meeting the energy requirements, improve system reliability, improve system stability for the Craig and Hayden generating stations, and leave the existing 115-kV and 138-kV lines in operation to provide additional transmission capacity that would function as backup transmission during an outage on another line. Minute amounts of lands would be displaced. Construction activities would disturb critical ranges for elk and mule deer, elk calving areas, and the mating and nesting areas of greater sandhill cranes, great blue herons, sage grouse, golden eagles, and prairie falcons. Management of timberland would damage natural vegetation. The line would traverse 3.1 miles of flood-prone area, and as many as three transmission towers would lie within the floodplain of the Colorado River. The visual quality of land crossed by the line would be degraded somewhat.

Not Available

1982-09-01T23:59:59.000Z

469

Thermal Expansion in Ocean and Coupled General Circulation Models  

Science Conference Proceedings (OSTI)

More than half of the predicted rise in future sea level caused by the enhanced greenhouse effect is currently thought to be due to the thermal expansion of the oceans. Here methods for quantifying this thermal expansion component of sea level ...

D. R. Jackett; T. J. McDougall; M. H. England; A. C. Hirst

2000-04-01T23:59:59.000Z

470

Optimal expansion of competence sets with multilevel skills  

Science Conference Proceedings (OSTI)

The purpose of competence set expansion is to find an optimal expansion process at the minimal cost and then obtain the required competence set from the acquired competence set to solve a problem. Several models have been proposed to address the competence ... Keywords: Competence set, Decision making, Multiple solutions

Jung-Fa Tsai; Pei-Chun Wang; Ming-Hua Lin

2012-04-01T23:59:59.000Z

471

Expansion of elastic bodies with application in the bread industry  

Science Conference Proceedings (OSTI)

This article is concerned with modeling the expansion of an elastic body with application to the evolution of bread dough during the proofing process. The main result is a set of linear second-order partial differential equations corresponding to an ... Keywords: B-Splines, Bread dough, Elastic expansion, Rayleigh-Ritz method, Surface evolution

P. C. Bollada

2008-10-01T23:59:59.000Z

472

Expansion of U. S. uranium enrichment capacity. Final environmental statement  

SciTech Connect

Reasonably foreseeable environmental, social, economic, and technological costs and benefits of postulated expansion of U. S. enrichment capacity through the year 2000 and reasonably available alternatives to such expansion are described. Both the gas centrifuge and gaseous diffusion methods for the enrichment of uranium are considered in this impact assessment. (JGB)

1976-04-01T23:59:59.000Z

473

System dynamics simulation of the expansion of the Panama Canal  

Science Conference Proceedings (OSTI)

The expansion of the Panama Canal could be the largest project attempted by the Republic of Panama in its 100 years of existence. The objective of this simulation study is to use the Canal Expansion project to develop and demonstrate how more precise ...

Humberto R. Alvarez A.; Dario Solis; Arnoldo R. Cano S.; Serge Sala-Diakanda

2006-12-01T23:59:59.000Z

474

Optical Curtain Effect: Extraordinary Optical Transmission Enhanced by Antireflection  

E-Print Network (OSTI)

In this paper, we employ an antireflective coating which comprises of inverted pi shaped metallic grooves to manipulate the behaviour of a TM-polarized plane wave transmitted through a periodic nanoslit array. At normal incidence, such scheme can not only retain the optical curtain effect in the output region, but also generate the extraordinary transmission of light through the nanoslits with the total transmission efficiency as high as 90%. Besides, we show that the spatially invariant field distribution in the output region as well as the field distribution of resonant modes around the inverted pi shaped grooves can be reproduced immaculately when the system is excited by an array of point sources beneath the inverted pi shaped grooves. In further, we investigate the influence of center-groove and side-corners of the inverted pi shaped grooves on suppressing the reflection of light, respectively. Based on our work, it shows promising potential in applications of enhancing the extraction efficiency as well ...

Cui, Yanxia; Lin, Yinyue; Li, Guohui; Hao, Yuying; He, Sailing; Fang, Nicholas X

2012-01-01T23:59:59.000Z

475

Definition: Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Service Service Jump to: navigation, search Dictionary.png Transmission Service Services provided to the Transmission Customer by the Transmission Service Provider to move energy from a Point of Receipt to a Point of Delivery.[1] Related Terms transmission lines, Transmission Customer, Transmission Service Provider, transmission line References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Service&oldid=480302" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

476

Arizona/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Arizona‎ | Transmission Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Arizona, the state has the authority to site high-voltage transmission lines. A public service corporation would need to obtain a Certificate of Environmental Compatibility (CEC) from the Arizona Power Plant and Transmission Line Siting Committee that is "affirmed and approved" by the Arizona Corporation Commission (ACC). State Siting Act Arizona Revised Statute (A.R.S.)§ 40-360 et seq. State Preemptive Authority If the Transmission Line Siting Committee (TLSC) finds that compliance with local ordinances, master plan or regulation is unreasonably restrictive and compliance is not feasible in view of technology available, then the TLSC may grant a certificate.[1]

477

Wireless power transmission for medical applications  

E-Print Network (OSTI)

We studied the wireless power transmission capabilities of microwave through human skin-tissue. Microwave transmission through simulated human skins was tested with rectenna array as a power receiver located under the ...

Payne, Joshua E.

478

A Computer Package for Transmission Line Analysis  

Science Conference Proceedings (OSTI)

A computer program, LIGNE, has been developed as a comprehensive teaching aid for the section on transmission line theory in an electromagnetics course. The program assists the student in the analysis of transmission lines, enabling him to quickly assess ...

Georges-Andre Chaudron; Manfred Nachman

1987-11-01T23:59:59.000Z

479

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

480

EA-1934: Expansion of Active Borrow Areas, Hanford Site, Richland,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1934: Expansion of Active Borrow Areas, Hanford Site, Richland, EA-1934: Expansion of Active Borrow Areas, Hanford Site, Richland, Washington EA-1934: Expansion of Active Borrow Areas, Hanford Site, Richland, Washington SUMMARY This EA evaluates the potential environmental impacts of expansion or continued use of existing sand and gravel pits located on the Hanford Site (Pits F, H, N, 6, 9, 18, 21, 23, 24, 30, and 34) and establishing one new borrow area source in the 100 Area for ongoing construction activities and fill material following remediation activities. The scope of this EA does not include borrow sources for silt-loam material. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 15, 2013 EA-1934: Mitigation Action Plan Expansion of Active Borrow Areas, Hanford Site, Richland, Washington

Note: This page contains sample records for the topic "regional transmission expansion" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

EA-1934: Expansion of Active Borrow Areas, Hanford Site, Richland,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Expansion of Active Borrow Areas, Hanford Site, Richland, 4: Expansion of Active Borrow Areas, Hanford Site, Richland, Washington EA-1934: Expansion of Active Borrow Areas, Hanford Site, Richland, Washington SUMMARY This EA evaluates the potential environmental impacts of expansion or continued use of existing sand and gravel pits located on the Hanford Site (Pits F, H, N, 6, 9, 18, 21, 23, 24, 30, and 34) and establishing one new borrow area source in the 100 Area for ongoing construction activities and fill material following remediation activities. The scope of this EA does not include borrow sources for silt-loam material. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 15, 2013 EA-1934: Mitigation Action Plan Expansion of Active Borrow Areas, Hanford Site, Richland, Washington

482

Tanzania Energy Development and Access Expansion Project | Open Energy  

Open Energy Info (EERE)

Energy Development and Access Expansion Project Energy Development and Access Expansion Project Jump to: navigation, search Name of project Tanzania Energy Development and Access Expansion Project Location of project Tanzania Energy Services Lighting, Cooking and water heating, Space heating, Cooling Year initiated 2007 Organization World Bank Website http://documents.worldbank.org Coordinates -6.369028°, 34.888822° References The World Bank[1] The objective of the Energy Development and Access Expansion Project of Tanzania is to improve the quality and efficiency of the electricity service provision in the three main growth centers of Dar es Salaam, Arusha, and Kilimanjaro and to establish a sustainable basis for energy access expansion. The project is consistent with the latest Joint Assistance Strategy (2007-2010) by specifically supporting the goals of the

483

Energy Infrastructure Events and Expansions Year-in-Review 2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Infrastructure Events and Expansions Year-in-Review 2010 Infrastructure Events and Expansions Year-in-Review 2010 Energy Infrastructure Events and Expansions Year-in-Review 2010 The Year-in-Review provides an overview of the events that occurred in 2010: disruptions and additions to energy infrastructure in the United States as well as international events of importance to U.S. energy supplies. The report is the culminating analysis of all of the 2010 issues of the Energy Assurance Daily (EAD). Energy Infrastructure Events and Expansions Year-in-Review 2010.pdf More Documents & Publications Energy Infrastructure Events and Expansions Year-in-Review 2011 Hardening and Resiliency: U.S. Energy Industry Response to Recent Hurricane Seasons - August 2010 Comparing the Impacts of the 2005 and 2008 Hurricanes on U.S. Energy

484

OPEC production: Untapped reserves, world demand spur production expansion  

Science Conference Proceedings (OSTI)

To meet projected world oil demand, almost all members of the Organization of Petroleum Exporting Countries (OPEC) have embarked on ambitious capacity expansion programs aimed at increasing oil production capabilities. These expansion programs are in both new and existing oil fields. In the latter case, the aim is either to maintain production or reduce the production decline rate. However, the recent price deterioration has led some major OPEC producers, such as Saudi Arabia and Iran, to revise downward their capacity plans. Capital required for capacity expansion is considerable. Therefore, because the primary source of funds will come from within each OPEC country, a reasonably stable and relatively high oil price is required to obtain enough revenue for investing in upstream projects. This first in a series of two articles discusses the present OPEC capacity and planned expansion in the Middle East. The concluding part will cover the expansion plans in the remaining OPEC countries, capital requirements, and environmental concerns.

Ismail, I.A.H. (Organization of the Petroleum Exporting Countries, Vienna (Austria))

1994-05-02T23:59:59.000Z

485

Acceleration of the cosmic expansion induced by symmetry breaking  

E-Print Network (OSTI)

It is proved that in order to obtain a model of the accelerated cosmic expansion the thing one only need to do is to add a perturbation term to the Einstein-Hilbert Lagrangian. This term leads to some symmetry breaking terms in the fields equation, which makes the cosmic expansion accelerating. A vacuum de Sitter solution is obtained. A new explanation of the acceleration of the cosmic expansion is presented. In this model the changing of the expansion from decelerating to accelerating is an intrinsic property of the universe without need of an exotic dark energy. The acceleration of the cosmic expansion is induced by the symmetry breaking perturbation of the gravitational energy. The cosmological constant problem, the coincidence problem and the problem of phantom divide line crossing are naturally solved. The results of the model are roughly consistent with the observations.

G. Y. Chee

2013-01-21T23:59:59.000Z

486

Updated Volumetric Expansion Factors for K Basin Sludge During Storage  

SciTech Connect

Sludge has accumulated in the K East (KE) and K West (KW) Basins at the Hanford Site. This sludge contains metallic uranium and uranium oxides that will corrode, hydrate, and generate and consume gases during containerized storage. From these corrosion reactions, two sludge expansion mechanisms can be expected: 1) expansion of the volume of the sludge solids from the generation of corrosion oxidation products that occupy more space than the starting-state sludge; and 2) expansion of the bulk sludge volume from the retention of hydrogen gas bubbles. This report provides a review and updated projections of the volumetric expansion occurring due to corrosion and gas retention during the containerized storage of K Basin sludge. New design and safety basis volume expansion values are provided for the following sludge streams: KW Floor, KW North Loadout Pit, KW canister, and fuel piece sludge.

Schmidt, Andrew J. (BATTELLE (PACIFIC NW LAB)); Delegard, Calvin H. (BATTELLE (PACIFIC NW LAB))

2003-03-14T23:59:59.000Z

487

EEI/DOE Transmission Capacity Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSMISSION CAPACITY: TRANSMISSION CAPACITY: PRESENT STATUS AND FUTURE PROSPECTS Eric Hirst Consulting in Electric-Industry Restructuring Bellingham, Washington June 2004 Prepared for Energy Delivery Group Edison Electric Institute Washington, DC Russell Tucker, Project Manager and Office of Electric Transmission and Distribution U.S. Department of Energy Washington, DC Larry Mansueti, Project Manager ii iii CONTENTS Page SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v LIST OF ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. TRANSMISSION CAPACITY: DATA AND PROJECTIONS . . . . . . . . . . . . . . . . . . . 5 HISTORICAL DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 CURRENT CONDITIONS . . . . . . .

488

Directional Reactive Power Ground Plane Transmission  

Directional Reactive Power Ground Plane Transmission Technology Summary ... The invention can transmit electrical power through the surface of the ...

489

Average transmission probability of a random stack  

E-Print Network (OSTI)

The transmission through a stack of identical slabs that are separated by gaps with random widths is usually treated by calculating the average of the logarithm of the transmission probability. We show how to calculate the average of the transmission probability itself with the aid of a recurrence relation and derive analytical upper and lower bounds. The upper bound, when used as an approximation for the transmission probability, is unreasonably good and we conjecture that it is asymptotically exact.

Yin Lu; Christian Miniatura; Berthold-Georg Englert

2009-07-31T23:59:59.000Z

490

High Resolution Transmission Microscopy Characterization of an ...  

Science Conference Proceedings (OSTI)

High Resolution Transmission Microscopy Characterization of an Oxide ... Line Dislocation Dynamics Simulation of fundamental dislocation properties in ...

491

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

low load levels there can be situations where the capacitive component of the transmission line causes voltage

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

492

Alternative Transmission Technologies for Joint Planning Studies  

Science Conference Proceedings (OSTI)

This report describes a detailed analysis of joint transmission planning needs and capabilities, including an assessment of current research in the area. The report has value as a starting point and reference for transmission planners engaged in joint planning exercises because it focuses on technologies that could facilitate joint transmission planning of a bulk power grid. A joint planning exercise involves the collaboration of multiple transmission planning groups that may each have ...

2013-12-09T23:59:59.000Z

493

Advantages of Integrating Precession Scanning Transmission ...  

Science Conference Proceedings (OSTI)

Presentation Title, Advantages of Integrating Precession Scanning Transmission Electron Microscopy in the Characterization of Metallic Materials. Author(s) ...

494

Transmission Electron Microscopy Studies on Lithium Battery ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2012 TMS Annual Meeting & Exhibition. Symposium , Energy Nanomaterials. Presentation Title, Transmission Electron Microscopy ...

495

Transportation Center Seminar........ "Proactive Transmission Planning in  

E-Print Network (OSTI)

Transportation Center Seminar........ "Proactive Transmission Planning in Electricity Networks of the biggest problems of actual power-systems transmission planning is its reactive nature. We formulate-systems transmission planning, generation investment, and market operation decisions and propose a methodology to solve

Bustamante, Fabián E.

496

The real problem with Merchant transmission  

SciTech Connect

Current regulatory policy distinguishes transmission investments that have primarily economic benefits from those that primarily enhance reliability. But no such dichotomy exists; congestion and reliability are inter-related in complex ways. Thus, solving the transmission investment problem is more complex than ''fixing'' merchant transmission; investment in the grid must be treated as a systems problem. (author)

Blumsack, Seth; Lave, Lester B.; Ilic, Marija

2008-03-15T23:59:59.000Z

497

Microsoft Word - CX-TucannonRiverExpansion-PPA2425_WeB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2012 , 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Johny Luiz Electrical Engineer - TEP-CSB-1 Proposed Action: Tucannon River Substation Expansion Project PP&A Project No.: 2,425 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6, Additions and modifications to transmission facilities; and, B4.11, Electric power substations and interconnection facilities Proposed by: Bonneville Power Administration (BPA) Location: Columbia County, Washington, T10N R41E Sec 8 and 17 Description of the Proposed Action: The energized yard at the existing Tucannon River Substation would be expanded to the east approximately 90 feet, and to the north approximately 100 feet to accommodate two new shunt capacitor banks and associated electrical equipment,

498

Regional State Committees Can Help Provide a Regional Perspective to Planning and Siting Decisions, Reducing the Need for Federal Preemption  

SciTech Connect

The Energy Policy Act of 2005 gave FERC the authority to preempt state and local transmission siting authorities under certain conditions, creating the potential for federal/state disputes. Such disputes are less likely to occur where there are open, regional planning processes. Multi-state advisory bodies known as regional state committees, working with RTOs, can provide a forum to evaluate transmission needs from a regional perspective, reducing the need for FERC involvement. (author)

Basheda, Gregory

2006-03-01T23:59:59.000Z

499

Electronics and hydraulics control transmission  

SciTech Connect

Caterpillar engineers have combined electronics and hydraulics for improved transmission control and productivity. The control system had extensive field test experience during development. The system accumulated more than 100,000 hours on 17 vehicles, with individual vehicle times in the 2000-10,000-hour range. Job sites were chosen to test the system over a wide range of applications and locales. The EPTC components are CAT-designed and made by outside suppliers. The components must comply with CAT designs and specifications. All components are 100% functionally tested. The control box is computer-tested functionally at the supplier and at CAT before vehicle installation.

Morris, H.C.; Sorrells, G.K.

1986-04-01T23:59:59.000Z

500

Pulse shaping with transmission lines  

DOE Patents (OSTI)

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, R.B.

1985-08-15T23:59:59.000Z