National Library of Energy BETA

Sample records for regional planning commission

  1. Commissioning Plan RM

    Office of Environmental Management (EM)

    ... of a CP review will be used by the DOE Federal Project Director and ultimately the ... (ST-5.3) ST-6 Has the project acquired the services of a qualified commissioning agent? ...

  2. Model Commissioning Plan and Guide Specifications

    SciTech Connect (OSTI)

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  3. Alaska Planning Commission Handbook | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Alaska Planning Commission HandbookPermittingRegulatory GuidanceGuide...

  4. Checkout, Testing, and Commissioning Plan RM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Checkout, Testing, and Commissioning Plan RM Checkout, Testing, and Commissioning Plan RM The CP RM Module is a tool that assists DOE federal project review teams in evaluating the sufficiency of the Commissioning Plan and its implementation. The CP RM can be used by the DOE federal project teams both to evaluate the adequacy of the Commissioning Plan documentation/programs and the execution of programs by the contractor. Commissioning Plan RM (2.88 MB) More Documents & Publications

  5. NMS 4-57 County Planning Commissions | Open Energy Information

    Open Energy Info (EERE)

    4-57 County Planning Commissions Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: NMS 4-57 County Planning CommissionsLegal...

  6. Regional Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydroelectric Reciprocating Internal Combustion Engine Fossil Fuel Turbines Alaska Energy Statistics, 2011 4 Energy Costs Vary 5 Regional Energy Planning * Energy Pathways led to ...

  7. NUCLEAR REGULATORY,.COMMISSION REGION I

    Office of Legacy Management (LM)

    Oliver Incorporated, authorized by Atomic Energy Commission (AEC) Lit SUB-00967. The ... In general, files which indicated thatlicf -material' -may,have,been used at-a particular ...

  8. Development of a commissioning plan for the APT linac

    SciTech Connect (OSTI)

    Funk, L.W.; Crandall, K.R.; Gilpatrick, J.D.; Gray, E.R.; Regan, A.H.; Rohlev, A.; Rybarcyk, L.J.; Wangler, T.P.

    1998-12-31

    The Accelerator Production of Tritium (APT) facility is based on a linac which incorporates both normal-conducting and superconducting RF technology and accelerates a 100-mA cw proton beam to an energy of 1,030 MeV or higher, depending on the desired production rate. Commissioning plans to achieve full power operation with minimum beam-induced activation of components have been evolving. This paper presents the main issues and the basic approaches that are now being discussed.

  9. Regional Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AEA is an independent and public corporation of the State of Alaska Created by ... for final draft development and interface with AkAES 7 Alaska's Energy Plans ...

  10. SU-E-T-630: Commissioning for SRS Planning Systems

    SciTech Connect (OSTI)

    Pella, S; Smith, C; Leventouri, T; Bacala, A

    2014-06-15

    Purpose: This study will try to find optimal procedures to collect small fields beam data for commissioning in treatment planning systems (TPS), and to provide a protocol to collect output factors for very small field sizes: 0.5 cm 0.5 cm to 4.0 cm 4.0 cm.This will help in determining the correct beam configuration methods in TPS planning intensity modulated radiation therapy (IMRT), and stereotactic radiosurgery SRS using mini multileaf collimation (mMLC). Methods: Data has been collected for a mMLC linear accelerator (linac) Novalis from 0.5 cm 0.5 cm to 10 cm 10 cm (its maximum field size). The TPS chosen is BrainLab, Eclipse and Cyberknife. The beam data collected was modeled and imported in the TPS. Verification plans were generated in solid water to confirm the goodness of the data. 3D and IMRT plans on regular CT scans were generated and verified using Mapcheck. All 3D plans with field sizes above 4 cm 4 cm verified excellent using a distance to agreement of 2 mm and a 2% tolerance. IMRT plans gave an error of -8%. New scans with new detectors have been taken, new field sizes were introduced, and focus has been applied on determining the dosimetric leaf gap. Results: Although this is still a work in progress, this study brings several issues to light: the importance of the correct technique in beam data collection from the correct watertank to the correct detectors. Readings for rectangular fields have to be taken especially for fields which one side is under 4 cm. Conclusion: The use of equivalent square fields will not provide correct readings for the fields with large differences between the length and the width.

  11. Stion Commissions PV System at Sandia Regional Test Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stion Commissions PV System at Sandia Regional Test Center - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense

  12. Commission.

    National Nuclear Security Administration (NNSA)

    July 2014 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. Highlights of the NMMSS 2014 Annual Users Training Meeting The Nuclear Materials Management and Safeguards System (NMMSS) Annual Users Training Meeting was held on May 12-15, 2014, in Denver, Colorado. The NMMSS serves a critical role in the U.S. Government's ability to maintain operational awareness of the inventory, status, and whereabouts of nuclear materials. Accuracy, transparency, and

  13. Commission.

    National Nuclear Security Administration (NNSA)

    November 2015 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. NMMSS 2016 Annual Users Training Meeting The Nuclear Materials Management and Safeguards System (NMMSS) 2016 Annual Users Training Meeting will be held May 9-12, 2016, in New Orleans, Louisiana. The NMMSS is the U.S. Government's official information system containing current and historical accounting data and other related nuclear material information collected from both government and

  14. Commission.

    National Nuclear Security Administration (NNSA)

    5 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. Register for the NMMSS 2015 Annual Users Training Meeting The Nuclear Materials Management and Safeguards System (NMMSS) 2015 Annual Users Training Meeting will be held May 11-14, 2015, in Las Vegas, Nevada. There is no registration fee to participate in this invaluable learning opportunity. NMMSS is the U.S. Government's official information system containing current and historical accounting data and

  15. Commission.

    National Nuclear Security Administration (NNSA)

    6 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory Commission. NMMSS 2016 Annual Users Training Meeting The Nuclear Materials Management and Safeguards System (NMMSS) 2016 Annual Users Training Meeting will be held May 9-12, 2016, in New Orleans, Louisiana. The NMMSS is the U.S. Government's official information system containing current and historical accounting data and other related nuclear material information collected from both government and commercial

  16. Regional Planning Process in the West

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning Process in the West Robert H. Easton Tribal Webinar Series March 30, 2016 Transmission Planning in the Western Interconnection  Transmission Planning in the Western Interconnection has been, is, and will continue to be a hierarchy of local, regional, and interconnection-wide coordinated planning efforts  Pre-Order 890 - CAISO, NTTG, ColumbiaGrid, and WestConnect were already forums for collaboration and coordination - WECC PCC Project Coordination and Path Rating Process, Annual

  17. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton

    2009-10-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  18. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton; Kent Norris

    2010-03-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  19. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Carl Wharton; Kent Norris

    2009-12-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  20. State of Alaska Regional Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tribal Energy Summit September 24, 2015 State of Alaska Regional Energy Planning Solar Energy Anaktuvuk Pass, Alaska Humpback Creek Hydroelectric Cordova, Alaska Wind Diesel Generation Selawik, Alaska WHPacific, Inc. REGIONAL PLANNING ZONES:  North Slope  Northwest Arctic  Bering Straits  Interior (YK/Upper Tanana)  YK Delta (Lower Yukon- Kuskokwim)  Chugach Logistics Reality Alaska Arctic Communities: Energy Platform A Holistic Approach Infrastructure Housing Water Systems

  1. Results of Dose Control and Measurement Plans Appliedfor SPEAR3 Commissioning Year (FY04)

    SciTech Connect (OSTI)

    Khater, Hesham; Liu, James; Prinz, Alyssa; Allan, Jim; Rokni, Sayed; /SLAC

    2007-02-12

    Dose control and measurement plans for the SPEAR3 Booster and storage ring have taken place during the SPEAR3 commissioning. The initial commissioning period (SPEAR3 start-up) covered the time period from the beginning of November 2003 to the early part of March 2004. The period from the beginning of March to the beginning of August 2004 has been mostly dedicated to the scientific program. The initial commissioning period was characterized with frequent injection and significantly higher losses. In comparison, the scientific program period was characterized with more stable beam operation with limited number of injections per day and lower beam losses. Three types of dose measurements, passive, active and special measurements, were implemented around the SPEAR3 Booster and storage ring. Based on the expected radiation hazards, several dose control measures were adopted at several stages of the commissioning. In the early stages of commissioning, areas within 4.5 m from the walls of the Booster and storage ring were designated as Radiation Areas (RA). Areas outside RA were classified as Radiologically Controlled Area (RCA). Access to these areas required less training than the radiation areas. A monthly review of the accelerator operation conditions and radiation measurement results were used to determine the changes needed for the RA classification status and associated dose control measures.

  2. KAir Battery Wins Southwest Regional Clean Energy Business Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    KAir Battery Wins Southwest Regional Clean Energy Business Plan Competition KAir Battery Wins Southwest Regional Clean Energy Business Plan Competition April 18, 2014 - 12:05pm...

  3. KAir Battery Wins Southwest Regional Clean Energy Business Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    KAir Battery Wins Southwest Regional Clean Energy Business Plan Competition KAir Battery Wins Southwest Regional Clean Energy Business Plan Competition April 18, 2014 - 12:05pm ...

  4. Saint Vincent and the Grenadines-Regional Implementation Plan...

    Open Energy Info (EERE)

    Regional Implementation Plan for CARICOM's Climate Change Resilience Framework Jump to: navigation, search Name Saint Vincent and the Grenadines-Regional Implementation Plan for...

  5. Regional Transportation Simulation Tool for Emergency Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    rtstep-diag TRACC RESEARCH Computational Fluid Dynamics Computational Structural Mechanics Transportation Systems Modeling Regional Transportation Simulation Tool for Emergency Evacuation Planning (Click to play movie) Large-scale evacuations from major cities during no-notice events - such as chemical or radiological attacks, hazardous material spills, or earthquakes - have an obvious impact on large regions rather than on just the directly affected area. The scope of impact includes the

  6. UNITED STATES NUCLEAR REGUtiTORY COMMISSION REGION I C31 PARK...

    Office of Legacy Management (LM)

    REGUtiTORY COMMISSION REGION I C31 PARK AVENUE KlNt OF PRUSSIC. PENNSYLVANIA 1P4D6 z,: P -. : &J L . . : ; .; 3 Do:ket No. 40-2286 Westinqhouse Electric Company Lamp D1vis-i ons ...

  7. SU-E-T-73: Commissioning of a Treatment Planning System for Proton Spot Scanning

    SciTech Connect (OSTI)

    Saini, J; Kang, Y; Schultz, L; Nicewonger, D; Herrera, M; Wong, T; Bowen, S; Bloch, C

    2014-06-01

    Purpose: A treatment planning system (TPS) was commissioned for clinical use with a fixed beam line proton delivery system. An outline of the data collection, modeling, and verification is provided. Methods: Beam data modeling for proton spot scanning in CMS Xio TPS requires the following measurements: (i) integral depth dose curves (IDDCs); (ii) absolute dose calibration; and (iii) beam spot characteristics. The IDDCs for 18 proton energies were measured using an integrating detector in a single spot field in a water phantom. Absolute scaling of the IDDCs were performed based on ion chamber measurements in mono-energetic 1010 cm{sup 2} fields in water. Beam spot shapes were measured in air using a flat panel scintillator detector at multiple planes. For beam model verification, more than 45 uniform dose phantom and patient plans were generated. These plans were used to measure range, point dose, and longitudinal and lateral profiles. Tolerances employed for verification are: point dose and longitudinal profiles, 2%; range, 1 mm; FWHM for lateral profiles, 2 mm; and patient plan dose distribution, gamma index of >90% at 3%/3 mm criteria. Results: More than 97% of the point dose measurements out of 115 were within +/-2% with maximum deviation of 3%. 98% of the ranges measured were within 1 mm with maximum deviation of 1.4mm. The normalized depth doses were within 2% at all depths. The maximum error in FWHM of lateral profiles was found to be less than 2mm. For 5 patient plans representing different anatomic sites, a total of 38 planes for 12 beams were analyzed for gamma index with average value of 99% and minimum of 94%. Conclusions: The planning system is successfully commissioned and can be safely deployed for clinical use. Measurements of IDDCs on user beam are highly recommended instead of using standard beam IDDCs.

  8. Sampling and analysis plan for the former Atomic Energy Commission bus lot property

    SciTech Connect (OSTI)

    Nielson, R.R.

    1998-07-01

    This sampling and analysis plan (SAP) presents the rationale and strategy for the sampling and analysis activities proposed in support of an initial investigation of the former Atomic Energy Commission (AEC) bus lot property currently owned by Battelle Memorial Institute. The purpose of the proposed sampling and analysis activity is to investigate the potential for contamination above established action levels. The SAP will provide defensible data of sufficient quality and quantity to support recommendations of whether any further action within the study area is warranted. To assist in preparing sampling plans and reports, the Washington State Department of Ecology (Ecology) has published Guidance on Sampling and Data Analysis Methods. To specifically address sampling plans for petroleum-contaminated sites, Ecology has also published Guidance for Remediation of Petroleum Contaminated Sites. Both documents were used as guidance in preparing this plan. In 1992, a soil sample was taken within the current study area as part of a project to remove two underground storage tanks (USTs) at Battelle`s Sixth Street Warehouse Petroleum Dispensing Station (Section 1.3). The results showed that the sample contained elevated levels of total petroleum hydrocarbons (TPH) in the heavy distillate range. This current study was initiated in part as a result of that discovery. The following topics are considered: the historical background of the site, current site conditions, previous investigations performed at the site, an evaluation based on the available data, and the contaminants of potential concern (COPC).

  9. National Clean Energy Business Plan Competition: 2014 Regional Winners |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy National Clean Energy Business Plan Competition: 2014 Regional Winners National Clean Energy Business Plan Competition: 2014 Regional Winners Addthis Western Southwest Region Winner 1 of 5 Western Southwest Region Winner KAir Battery won the Rice Business Plan Competition for its cost-effective large-scale stationary potassium-air battery. Image: Courtesy of KAir Battery Southeastern Region Winner 2 of 5 Southeastern Region Winner Energy Internet won the ACC Clean Energy

  10. National Clean Energy Business Plan Competition: Six Regional Winners

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advance to Final Round | Department of Energy Clean Energy Business Plan Competition: Six Regional Winners Advance to Final Round National Clean Energy Business Plan Competition: Six Regional Winners Advance to Final Round May 16, 2014 - 1:14pm Addthis Western Southwest Region Winner 1 of 5 Western Southwest Region Winner KAir Battery won the Rice Business Plan Competition for its cost-effective large-scale stationary potassium-air battery. Image: Courtesy of KAir Battery Southeastern Region

  11. Design studies and commissioning plans for plasma acceleration research station experimental program

    SciTech Connect (OSTI)

    Mete, O.; Xia, G.; Hanahoe, K.; Dover, M.; Wigram, M.; Wright, J.; Zhang, J.; Smith, J.

    2015-10-15

    Plasma acceleration research station is an electron beam driven plasma wakefield acceleration test stand proposed for CLARA facility in Daresbury Laboratory. In this paper, the interaction between the electron beam and the plasma is numerically characterised via 2D numerical studies by using VSIM code. The wakefields induced by a single bunch travelling through the plasma were found to vary from 200 MV/m to 3 GV/m for a range of bunch length, bunch radius, and plasma densities. Energy gain for the particles populating the bunch tail through the wakefields driven by the head of the bunch was demonstrated. After determining the achievable field for various beams and plasma configurations, a reference setting was determined for further studies. Considering this reference setting, the beam quality studies were performed for a two-bunch acceleration case. The maximum energy gain as well as the energy spread mitigation by benefiting from the beam loading was investigated by positioning the witness and driver bunches with respect to each other. Emittance growth mechanisms were studied considering the beam-plasma and beam-wakefield interactions. Eventually, regarding the findings, the initial commissioning plans and the aims for the later stages were summarised.

  12. KAir Battery Wins Southwest Regional Clean Energy Business Plan Competition

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy KAir Battery Wins Southwest Regional Clean Energy Business Plan Competition KAir Battery Wins Southwest Regional Clean Energy Business Plan Competition April 18, 2014 - 12:05pm Addthis KAir Battery won the Southwest region of the Energy Department’s National Clean Energy Business Plan Competition for their large-scale stationary battery. | Photo courtesy of KAir Battery KAir Battery won the Southwest region of the Energy Department's National Clean Energy Business

  13. Early Commissioning Experience and Future Plans for the 12 GeV Continuous Electron Beam Accelerator Facility

    SciTech Connect (OSTI)

    Spata, Michael F.

    2014-12-01

    Jefferson Lab has recently completed the accelerator portion of the 12 GeV Upgrade for the Continuous Electron Beam Accelerator Facility. All 52 SRF cryomodules have been commissioned and operated with beam. The initial beam transport goals of demonstrating 2.2 GeV per pass, greater than 6 GeV in 3 passes to an existing experimental facility and greater than 10 GeV in 5-1/2 passes have all been accomplished. These results along with future plans to commission the remaining beamlines and to increase the performance of the accelerator to achieve reliable, robust and efficient operations at 12 GeV are presented.

  14. DOE Seeks Comment on Regional Standards Enforcement Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Comment on Regional Standards Enforcement Plan DOE Seeks Comment on Regional Standards Enforcement Plan November 12, 2015 - 4:50pm Addthis DOE has proposed regulations setting forth how the Department would enforce the regional standards for central air conditioners and is seeking comment from the public about the enforcement plan. The proposed rule was developed by a working group of efficiency advocates, manufacturers, utility representatives, contractors, and distributors. Addthis

  15. Managing the Night Off-Peak Power Demand in the Central Region UPS with Newly Commissioned NPP Capacities

    SciTech Connect (OSTI)

    Aminov, R. Z.; Pron, D. M.

    2014-01-15

    The use of hydrogen technologies as a controlled-load consumer based on the newly commissioned base-load nuclear power plants to level out the daily load profile is justified for the Unified Power System (UPS) of the Central Region of Russia, as an example, for the period till 2020.

  16. EM Marks Progress on Facilities, Outlines Safe Startup and Commissioning Plans

    Broader source: Energy.gov [DOE]

    WASHINGTON, D.C. – Leadership from EM and its contractors highlighted measurable progress on major cleanup facilities across the complex and discussed a safe and successful path forward for startup and commissioning at an event for the House Nuclear Cleanup Caucus on June 8.

  17. Title 24 Chapter 117 Municipal and Regional Planning and Development...

    Open Energy Info (EERE)

    Title 24 Chapter 117 Municipal and Regional Planning and Development Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 24...

  18. Government Performance and Results Act: Performance plan FY 1999, U.S. Nuclear Regulatory Commission. Volume 1

    SciTech Connect (OSTI)

    Fuches, J.L.

    1998-02-01

    The Nuclear Regulatory Commission`s (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency`s strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to help facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended.

  19. National Clean Energy Business Plan Competition: Five Regional Winners Head

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Final Round in Washington, D.C. | Department of Energy Five Regional Winners Head to Final Round in Washington, D.C. National Clean Energy Business Plan Competition: Five Regional Winners Head to Final Round in Washington, D.C. June 10, 2015 - 3:45pm Addthis Five student-led start-up companies that won regional competitions across the United States will travel to Washington, D.C., on June 24 to compete for a $50,000 prize in the National Clean Energy Business Plan Competition. |

  20. SU-E-T-572: Beam Characteristics and Treatment Planning Commissioning for a New Proton Therapy Unit

    SciTech Connect (OSTI)

    Zhao, T; Sun, B; Grantham, K; Santanam, L; Goddu, S; Klein, E

    2014-06-01

    Purpose: A single-room proton system, the Mevion S250, was introduced into the arena of proton radiotherapy by Mevion Medical Systems. The first unit was installed and operates at the S. Lee Kling Proton Therapy Center at Barnes-Jewish Hospital. The objective of this abstract is to report the system's beam characteristics and Eclipse commissioning. Methods: Commissioning data were acquired for modelling longitudinal fluence, virtual source position, effective source position, source size and Bragg peaks in Eclipse. Stoichiometric CT calibration was generated via ICRU44 human. Spread-out Bragg peaks (SOBP) were measured with Parallel Plate Chamber and profiles with solid state detector for model validation. Heterogeneity effects were measured with bone and lung inserts in the beam line. RT dose was computed in a virtual water phantom, and exported from Eclipse to compare with measurements at various depths and axis. SOBPs were fine-tuned with partial shining correction and entry correction to match measurements. Output factor was measured for each individual field with an ADCL ion chamber in a water tank and fitted to a polynomial function to cross-check the monitor unit verification. Results: Ranges of all 24 options were measured within 1mm tolerance. Modulations met a 1mm or 2% tolerance. SOBP flatness met a 3% tolerance. Distal fall off (80%-20%) were measured between 6mm and 7mm for all options. Virtual source positions varied between 177cm and 195cm, decreasing with field size and range. SOBP generated by Eclipse agreed with measurements within 3% in the entry region, and 1%/1mm in other regions. Sanity check for output achieved 5% accuracy in 98% of cases. Conclusion: The commissioning of the first Mevions S250 proton therapy system met specifications. The unit has been put in clinical operation since 12/17/2013.

  1. Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems

    SciTech Connect (OSTI)

    Mai, T.; Drury, E.; Eurek, K.; Bodington, N.; Lopez, A.; Perry, A.

    2013-01-01

    This report introduces a new capacity expansion model, the Resource Planning Model (RPM), with high spatial and temporal resolution that can be used for mid- and long-term scenario planning of regional power systems. Although RPM can be adapted to any geographic region, the report describes an initial version of the model adapted for the power system in Colorado. It presents examples of scenario results from the first version of the model, including an example of a 30%-by-2020 renewable electricity penetration scenario.

  2. The promise of regional coordination and power planning

    SciTech Connect (OSTI)

    Cohn, A.P.

    1994-12-31

    The electric utility industry has pervasive regulation. Practitioners in the field of electric utility regulation have traditionally concentrated their attention on regulatory control and oversight at federal and/or state levels. However, a third focal point must now be considered - transmission system planning and integration. The most recent evidence of this is the appearance of Regional Transmission Groups (RTG). This article briefly describes some of the forums in which regional coordination/regulation is occurring, and then focuses on the promise of RTG and the challenges inherent in RTG development.

  3. Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-02-01

    This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  4. Independent Verification and Validation Of SAPHIRE 8 Software Quality Assurance Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    This report provides an evaluation of the Software Quality Assurance Plan. The Software Quality Assurance Plan is intended to ensure all actions necessary for the software life cycle; verification and validation activities; documentation and deliverables; project management; configuration management, nonconformance reporting and corrective action; and quality assessment and improvement have been planned and a systematic pattern of all actions necessary to provide adequate confidence that a software product conforms to established technical requirements; and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  5. RTSTEP regional transportation simulation tool for emergency planning - final report.

    SciTech Connect (OSTI)

    Ley, H.; Sokolov, V.; Hope, M.; Auld, J.; Zhang, K.; Park, Y.; Kang, X.

    2012-01-20

    Large-scale evacuations from major cities during no-notice events - such as chemical or radiological attacks, hazardous material spills, or earthquakes - have an obvious impact on large regions rather than on just the directly affected area. The scope of impact includes the accommodation of emergency evacuation traffic throughout a very large area; the planning of resources to respond appropriately to the needs of the affected population; the placement of medical supplies and decontamination equipment; and the assessment and determination of primary escape routes, as well as routes for incoming emergency responders. Compared to events with advance notice, such as evacuations based on hurricanes approaching an affected area, the response to no-notice events relies exclusively on pre-planning and general regional emergency preparedness. Another unique issue is the lack of a full and immediate understanding of the underlying threats to the population, making it even more essential to gain extensive knowledge of the available resources, the chain of command, and established procedures. Given the size of the area affected, an advanced understanding of the regional transportation systems is essential to help with the planning for such events. The objectives of the work described here (carried out by Argonne National Laboratory) is the development of a multi-modal regional transportation model that allows for the analysis of different evacuation scenarios and emergency response strategies to build a wealth of knowledge that can be used to develop appropriate regional emergency response plans. The focus of this work is on the effects of no-notice evacuations on the regional transportation network, as well as the response of the transportation network to the sudden and unusual demand. The effects are dynamic in nature, with scenarios changing potentially from minute to minute. The response to a radiological or chemical hazard will be based on the time-delayed dispersion of

  6. Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems

    Broader source: Energy.gov [DOE]

    In this report, we introduce a new transparent regional capacity expansion model with high spatio-temporal resolution and detailed representation of dispatch. The development of this model, referred to as the Resource Planning Model (RPM), is motivated by the lack of a tool in the public domain that can be used to characterize optimal regional deployment of resources with detailed dispatch modeling. In particular, RPM is designed to evaluate scenarios of renewable technology deployment to meet renewable portfolio standard (RPS) and emission-reduction goals, and to project possible deployment levels for various projections of future technology and fuel prices.

  7. CDKN-CARICOM-Trinidad and Tobago-A Regional Implementation Plan...

    Open Energy Info (EERE)

    CDKN-CARICOM-Trinidad and Tobago-A Regional Implementation Plan for CARICOM's Regional Climate Change Resilience Framework Redirect page Jump to: navigation, search REDIRECT...

  8. Commissioning Specifications

    Office of Energy Efficiency and Renewable Energy (EERE)

    Commissioning specifications outline basic requirements of the commissioning process and detail the roles and responsibilities of each party involved. System checklists, startup requirements, and...

  9. SU-E-T-585: Commissioning of Electron Monte Carlo in Eclipse Treatment Planning System for TrueBeam

    SciTech Connect (OSTI)

    Yang, X; Lasio, G; Zhou, J; Lin, M; Yi, B; Guerrero, M

    2014-06-01

    Purpose: To commission electron Monte Carlo (eMC) algorithm in Eclipse Treatment Planning System (TPS) for TrueBeam Linacs, including the evaluation of dose calculation accuracy for small fields and oblique beams and comparison with the existing eMC model for Clinacs. Methods: Electron beam percent-depth-dose (PDDs) and profiles with and without applicators, as well as output factors, were measured from two Varian TrueBeam machines. Measured data were compared against the Varian TrueBeam Representative Beam Data (VTBRBD). The selected data set was transferred into Eclipse for beam configuration. Dose calculation accuracy from eMC was evaluated for open fields, small cut-out fields, and oblique beams at different incident angles. The TrueBeam data was compared to the existing Clinac data and eMC model to evaluate the differences among Linac types. Results: Our measured data indicated that electron beam PDDs from our TrueBeam machines are well matched to those from our Varian Clinac machines, but in-air profiles, cone factors and open-filed output factors are significantly different. The data from our two TrueBeam machines were well represented by the VTBRBD. Variations of TrueBeam PDDs and profiles were within the 2% /2mm criteria for all energies, and the output factors for fields with and without applicators all agree within 2%. Obliquity factor for two clinically relevant applicator sizes (1010 and 1515 cm{sup 2}) and three oblique angles (15, 30, and 45 degree) were measured for nominal R100, R90, and R80 of each electron beam energy. Comparisons of calculations using eMC of obliquity factors and cut-out factors versus measurements will be presented. Conclusion: eMC algorithm in Eclipse TPS can be configured using the VTBRBD. Significant differences between TrueBeam and Clinacs were found in in-air profiles and open field output factors. The accuracy of the eMC algorithm was evaluated for a wide range of cut-out factors and oblique incidence.

  10. Transportation Emergency Preparedness Program Plan, U.S. Department of Energy Region 6

    SciTech Connect (OSTI)

    Marsha Keister

    2010-04-01

    The United States Department of Energy (DOE) Region 6 Transportation Emergency Preparedness Program Plan (TEPP Plan) operates within the framework of the DOE emergency management system for developing, coordinating, and directing emergency planning, preparedness, and readiness assurance activities for radiological transportation incidents. The DOE Region 6 TEPP Plan is a narrative description of the DOE Transportation Emergency Preparedness Program activities, training and technical assistance provided to states and tribes along DOE's transportation corridors in DOE Region 6.

  11. BPA to share costs with PUDs in regional planning project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Construction-related jobs would also boost local economies. ColumbiaGrid's Planning and Expansion Functional Agreement brought the parties together. "It clearly...

  12. California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project

    SciTech Connect (OSTI)

    Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

    2004-07-01

    The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

  13. Regional Partner Announces Plans for Carbon Storage Project Using CO2

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Captured from Coal-Fired Power Plant | Department of Energy Regional Partner Announces Plans for Carbon Storage Project Using CO2 Captured from Coal-Fired Power Plant Regional Partner Announces Plans for Carbon Storage Project Using CO2 Captured from Coal-Fired Power Plant July 20, 2009 - 1:00pm Addthis Washington, DC - Southern Company and the Southeast Regional Carbon Sequestration Partnership (SECARB), one of seven members of the U.S. Department of Energy (DOE) Regional Carbon

  14. Independent Verification and Validation Of SAPHIRE 8 System Test Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-02-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE System Test Plan is to assess the approach to be taken for intended testing activities associated with the SAPHIRE software product. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  15. Beyond Commissioning

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas

    2004-08-31

    The emerging practice of building commissioning generally provides energy savings of 10% to, in some cases, more than 60% of a building's energy consumption. Moreover, commissioning ensures that equipment and systems are installed and operate properly, providing occupants with the conditions expected. Without commissioning, new buildings can have incorrect equipment installed, devices like fans installed backwards, and unimplemented control algorithms to mention a few deficiencies sometimes found. Existing buildings can have faulty and failed equipment such as clogged filters and coils, stuck dampers, leaky valves, and imbalanced air distribution, as well as overridden controls, improper set points, and incorrect schedules. Commissioning of new and existing buildings helps prevent and alleviate such problems. Yet only a small fraction of commercial buildings has ever been commissioned, and many buildings that have been commissioned have only a fraction of the recommended actions implemented. Time may change this situation or maybe other changes can accelerate the progress of commissioning. Will commissioning continue in the future as it is performed today or must it change? The authors share a vision for how the functions provided by commissioning could change in the future. The paper delves into the roles of automation technology for functional testing, diagnostics, prognostics, data management, asset tracking, and project management in building commissioning. Methods of delivery explored for these capabilities include laptop-, desktop-, and pda-based tools, web-based services, and ubiquitous embedded networked processing. The authors present a vision for how these technologies could change the practice of commissioning and the impacts this could bring for commercial buildings in the U.S. and throughout the world. Potential impacts on building performance, energy consumption, peak power, and occupant satisfaction are examined.

  16. National Clean Energy Business Plan Competition: Five Regional...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Eastern Midwest Region - Clean Energy Challenge run by Clean Energy Trust Case Western Reserve University: FGC Plasma Solutions FGC Plasma Solutions has developed a novel way to ...

  17. National Clean Energy Business Plan Competition: Six Regional...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Western Region -- First Look West run by California Institute of Technology University of Houston, REEcycle REEcycle reclaims rare earth elements from magnets in electronics, ...

  18. 24 V.S.A. Chapter 117 Municipal and Regional Planning and Development...

    Open Energy Info (EERE)

    4 V.S.A. Chapter 117 Municipal and Regional Planning and Development Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: 24 V.S.A....

  19. Application Periods Open for 2014 National Clean Energy Business Plan Competition's Regional Contests

    Broader source: Energy.gov [DOE]

    The Energy Department today announced the opening of the application periods for six regional competitions that are part of the 2014 U.S. Department of Energy National Clean Energy Business Plan Competition.

  20. Assessing climate impacts of planning policies-An estimation for the urban region of Leipzig (Germany)

    SciTech Connect (OSTI)

    Schwarz, Nina Bauer, Annette Haase, Dagmar

    2011-03-15

    Local climate regulation by urban green areas is an important urban ecosystem service, as it reduces the extent of the urban heat island and therefore enhances quality of life. Local and regional planning policies can control land use changes in an urban region, which in turn alter local climate regulation. Thus, this paper describes a method for estimating the impacts of current land uses as well as local and regional planning policies on local climate regulation, using evapotranspiration and land surface emissivity as indicators. This method can be used by practitioners to evaluate their policies. An application of this method is demonstrated for the case study Leipzig (Germany). Results for six selected planning policies in Leipzig indicate their distinct impacts on climate regulation and especially the role of their spatial extent. The proposed method was found to easily produce a qualitative assessment of impacts of planning policies on climate regulation.

  1. Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Resource Center Resource Center Welcome! The Building Technologies Office (BTO) carries out technology research, development, market stimulation, and regulatory activities through an ongoing process of planning and analysis, implementation, and review. The BTO Resource Center includes links to documents and solution centers that guide the program management process and illustrate associated results and public benefits. Please email btoweb@ee.doe.gov with any questions. Emerging Technologies

  2. WE-F-16A-06: Using 3D Printers to Create Complex Phantoms for Dose Verification, Quality Assurance, and Treatment Planning System Commissioning in Radiotherapy

    SciTech Connect (OSTI)

    Kassaee, A; Ding, X; McDonough, J; Reiche, M; Witztum, A; Teo, B

    2014-06-15

    Purpose: To use 3D printers to design and construct complex geometrical phantoms for commissioning treatment planning systems, dose calculation algorithms, quality assurance (QA), dose delivery, and patient dose verifications. Methods: In radiotherapy, complex geometrical phantoms are often required for dose verification, dose delivery and calculation algorithm validation. Presently, fabrication of customized phantoms is limited due to time, expense and challenges in machining of complex shapes. In this work, we designed and utilized 3D printers to fabricate two phantoms for QA purposes. One phantom includes hills and valleys (HV) for verification of intensity modulated radiotherapy for photons, and protons (IMRT and IMPT). The other phantom includes cylindrical cavities (CC) of various sizes for dose verification of inhomogeneities. We evaluated the HV phantoms for an IMPT beam, and the CC phantom to study various inhomogeneity configurations using photon, electron, and proton beams. Gafcromic films were used to quantify the dose distributions delivered to the phantoms. Results: The HV phantom has dimensions of 12 cm 12 cm and consists of one row and one column of five peaks with heights ranging from 2 to 5 cm. The CC phantom has a size 10 cm 14 cm and includes 6 cylindrical cavities with length of 7.2 cm and diameters ranging from 0.6 to 1.2 cm. The IMPT evaluation using the HV phantom shows good agreement as compared to the dose distribution calculated with treatment planning system. The CC phantom also shows reasonable agreements for using different algorithms for each beam modalities. Conclusion: 3D printers with submillimiter resolutions are capable of printing complex phantoms for dose verification and QA in radiotherapy. As printing costs decrease and the technology becomes widely available, phantom design and construction will be readily available to any clinic for testing geometries that were not previously feasible.

  3. EV Community Readiness projects: Delaware Valley Regional Planning Commission (PA); Metropolitan Energy Information Center, Inc. (KS, MO)

    Broader source: Energy.gov [DOE]

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  4. A Comprehensive Approach to Bi-National Regional Energy Planning in the Pacific Northwest

    SciTech Connect (OSTI)

    Matt Morrison

    2007-12-31

    The Pacific NorthWest Economic Region, a statutory organization chartered by the Northwest states of Alaska, Washington, Idaho, Montana, and Oregon, and the western Canadian provinces of British Columbia, Alberta, and the Yukon through its Energy Working Group launched a bi-national energy planning initiative designed to create a Pacific Northwest energy planning council of regional public/private stakeholders from both Canada and the US. There is an urgent need to deal with the comprehensive energy picture now before our hoped for economic recovery results in energy price spikes which are likely to happen because the current supply will not meet predicted demand. Also recent events of August 14th have shown that our bi-national energy grid system is intricately interdependent, and additional planning for future capacity is desperately needed.

  5. Regional power systems planning: a state of the art assessment. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-10-01

    The purpose of this report was to define regional power systems planning problems, the tools available and their shortcomings, and to document all of the above in a concise readable form. The approach consisted of a survey and literature search. The survey determined the tools being used by utilities, the tools they had rejected, and the tools they planned to try out. The literature search was conducted for the purpose of documenting the tools available, and performing a comparative analysis of these tools. The project included a mix of utility, university, and consulting organizations. Several organizations were consulted in the selection of the participants. A non-profit organization, The University of Oklahoma, was selected to manage the project. The results were reviewed in a series of four one day meetings by known authorities in each field. This report consists of the results of this project. Perhaps its major finding is that several aspects of the regional planning problem are not well defined, the roles of the various participants in regional planning is not clear, and certainly research is needed for the development of new methodology.

  6. Commissioning Guidance for ESPCs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COMMISSIONING GUIDANCE FOR ESPCs CONTENTS Introduction ................................................................................................................................................... 1 Overview of Commissioning in the ESPC Process ...................................................................................... 2 Summary of Roles And Responsibilities In ESPC Project Commissioning ................................................. 3 Key Elements of Commissioning

  7. Strategic environmental assessment of energy planning tools. A study of Italian regions and provinces

    SciTech Connect (OSTI)

    De Montis, Andrea

    2014-04-01

    SEA has been applied in different ways in EU energy and environmental planning instruments, because different member states have interpreted European Directive 2001/42/CE in a variety of ways. Italy, for example, has only recently completed the integration of the directive into its legislation, through a number of decrees which were approved between 2006 and 2010. As a result SEA practice in Italy is very fragmented, particularly with respect to energy planning, and needs to be steered towards homogeneous quality objectives. The aim of this paper is to study the quality of the SEA reports on the energy and environmental planning tools used by Italian regions and provinces. We study nine cases and use the methodology suggested by Fisher (2010) in his review of the quality of SEA. To be more precise, we integrate the views of external evaluators with those of a selection of the personnel directly involved in preparing the plans. Our results show that there are some differences in the quality scores given by the outsiders and insiders, although the two groups identified similar strengths and weaknesses in implementing SEA. - Highlights: This is a comparative study on SEA report quality within Italian energy planning tools. In Italy, the level of SEA implementation on energy planning is still poor. External academic experts and internal officers assessed SEA reports' quality. Outsiders and insiders unveil a similar judgement. Most critical remarks concern consultation, monitoring measures, and follow-up.

  8. Assessing the health equity impacts of regional land-use plan making: An equity focussed health impact assessment of alternative patterns of development of the Whitsunday Hinterland and Mackay Regional Plan, Australia (Short report)

    SciTech Connect (OSTI)

    Gunning, Colleen; Harris, Patrick; Mallett, John

    2011-07-15

    Health service and partners completed an equity focussed health impact assessment to influence the consideration of health and equity within regional land-use planning in Queensland, Australia. This project demonstrated how an equity oriented assessment matrix can assist in testing regional planning scenarios. It is hoped that this HIA will contribute to the emerging interest in ensuring that potential differential health impacts continue to be considered as part of land-use planning processes.

  9. The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations

    SciTech Connect (OSTI)

    Kirby, Brendan J

    2006-07-01

    Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second

  10. SPEAR3 | Commissioning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accelerator Toolbox Parameter list (updated 060605) Power supply list Linear Optics from Closed Orbits (LOCO) Commissioning Schedule Commissioning Program(.ppt)...

  11. Independent Verification and Validation Of SAPHIRE 8 Software Acceptance Test Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2010-03-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE 8 Software Acceptance Test Plan is to assess the approach to be taken for intended testing activities. The plan typically identifies the items to be tested, the requirements being tested, the testing to be performed, test schedules, personnel requirements, reporting requirements, evaluation criteria, and any risks requiring contingency planning. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  12. Oregon Public Utility Commission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oregon Public Utility Commission Oregon Public Utility Commission Offer comments on the United States Department of Energy Smart Grid Request for Information (RFI). Oregon Public Utility Commission (330.3 KB) More Documents & Publications Implementing the National Broadband Plan by Empowering Consumers and the Smart Grid: Data Access, Third Party Use, and Privacy- Request for Information Edison Electric Institute (EEI) Regulatory Burden RFI, 77 Fed. Reg. 47328 Comments of the American Public

  13. Ozone transport commission developments

    SciTech Connect (OSTI)

    Joyce, K.M.

    1995-08-01

    On September 27, 1994, the states of the Ozone Transport Commission (OTC) signed an important memorandum of understanding (MOU) agreeing to develop a regional strategy for controlling stationary sources of nitrogen oxide emissions. Specifically, the states of the Ozone Transport Region, OTR, agreed to propose regulations for the control of NOx emissions from boilers and other indirect heat exchangers with a maximum gross heat input rate of at least 250 million BTU per hour. The Ozone Transport Region was divided into Inner, Outer and Northern Zones. States in the Outer Zone agreed to reduce NOx emissions by 55%. States in the Inner Zone agreed to reduce NOx emissions 65%. Facilities in both zones have the option to emit NOx at a rate no greater than 0.2 pounds per million Btu by May 1, 1999. This option provides fairness for the gas-fired plants which already have relatively low NOx emissions. Additionally, States in the Inner and Outer Zones agreed to reduce their NOx emissions by 75% or to emit NOx at a rate no greater than 0.15 pounds per million BTU by May 1, 2003. The Northern Zone States agree to reduce their rate of NOx emissions by 55% from base year levels by May 1, 2003, or to emit NOx at a rate no greater than 0.2 pounds per million BTU. As part of this MOU, States also agreed to develop a regionwide trading mechanism to provide a cost-effective mechanism for implementing the reductions.

  14. Northwest Alaska Native Association Regional Corporation- 2007 Strategic Energy Planning Project

    Broader source: Energy.gov [DOE]

    The Northwest Alaska Native Association (NANA) Regional Corporation (NRC) is an Alaskan Native regional corporation serving over 11,400 shareholders of the NANA region and its traditional communities.

  15. DOE Announces Webinars on Strategic Energy Planning, the Successful...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Energy Planning, the Successful Commissioning of Refrigeration Systems, and More DOE Announces Webinars on Strategic Energy Planning, the Successful Commissioning of...

  16. NUCLEAR REGULATORY COMMISSION

    Office of Environmental Management (EM)

    NUCLEAR REGULATORY COMMISSION 10 CFR Parts 71 and 73 RIN 3150-AG41 Advance Notification to Native American Tribes of Transportation of Certain Types of Nuclear Waste AGENCY: ...

  17. California Energy Commission

    Broader source: Energy.gov (indexed) [DOE]

    California Energy Commission Quadrennial Water Review Comments - June 19, 2014 Water-Energy Nexus Water and energy systems are inextricably linked -- producing energy uses large ...

  18. Commissioning guidance for ESPCs

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    Guidance for facility managers describing the commissioning process in Super ESPC contracts and how these contracts can achieve the objective of meeting facility performance requirements.

  19. Commissioning Process for Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Process for Federal Facilities Commissioning Process for Federal Facilities The commissioning process for federal facilities (including new construction and existing buildings) can be completed in four steps. Step 1: Plan The planning step includes developing and agreeing upon the overall commissioning objectives and strategies, assembling the project team, and compiling and perusing building and equipment documentation. Objectives for this step are to: Optimize building operations to reduce

  20. Investigating Potential Strategies for Automating Commissioning Activities

    SciTech Connect (OSTI)

    Brambley, Michael R.; Briggs, Robert S.; Katipamula, Srinivas; Dasher, Carolyn; Luskay, Larry; Irvine, Linda

    2002-05-31

    This paper provides summary results from a project on automated and continuous commissioning currently underway for the Air-Conditioning & Refrigeration Technology Institute (ARTI). The project focuses on developing methods for automating parts of the commissioning of heating, ventilating and air-conditioning (HVAC) equipment in newly-built, as well as existing, commercial buildings. This paper provides a summary of work completed to date, which has focused on selecting building systems; operation problems; and parts of the commissioning process where automation is likely to provide the greatest benefits. It also includes an overview of the approach planned for development and demonstration of methods for automating the selected areas.

  1. Guidelines for residential commissioning

    SciTech Connect (OSTI)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to

  2. NANA Regional Native Corporation - Geothermal and Wind Resource Assessments; Strategic Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NANA Regional Corporation Overview November 7, 2007 Building on Our Strengths This is NANA | NANA Regional * Regional Native corporation for the NW Arctic region- based in Kotzebue * 7,200 people living in 11 communities or villages; total 11,000 shareholders * NW Arctic Borough: governing body for the region. * Encompasses 38,000 square miles, about the size of Indiana. * "Tribal Members" (Inupiat Eskimos) who live the subsistence lifestyle Building on Our Strengths This is NANA |

  3. Chapter 9: Commissioning the Building

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    : Commissioning the Building Commissioning Process Overview Commissioning Activities and Documentation LANL | Chapter 9 Commissioning the Building Commissioning Process Overview Commissioning is a process - a systematic process of ensuring that a building performs in accordance with the design intent, contract documents, and the owner's operational needs. Commissioning is fundamental to the success of the whole-building design process. Due to the sophistication of building designs and the com-

  4. Nuclear Regulatory Commission issuances

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  5. Retro-Commissioning Program

    Broader source: Energy.gov [DOE]

    To obtain incentives, interested applicants must work with a Retro-Commissioning Service Provider adviser to complete the initial study. Please note that customer eligibility for Focus on Energy ...

  6. Nuclear Regulatory Commission Issuances

    SciTech Connect (OSTI)

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  7. Idaho Public Utilities Commission Approves Neal Hot Springs Power...

    Open Energy Info (EERE)

    Geothermal Area Regions (0) Retrieved from "http:en.openei.orgwindex.php?titleIdahoPublicUtilitiesCommissionApprovesNealHotSpringsPowerPurchaseAgreement&oldid76143...

  8. Commissioning and Retro-Commissioning Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commissioning and Retro-Commissioning Resources Commissioning and Retro-Commissioning Resources To ensure a new building's systems are correctly installed and are operating properly, a commissioning program may be incorporated into all building phases, including design, construction, and operations. Likewise, a retro-commissioning process is used for identifying and improving less-than-optimal energy performance in an existing building's equipment and control systems. State and local governments

  9. Energy Efficiency in Western Utility Resource Plans: Impacts onRegional Resources Assessment and Support for WGA Policies

    SciTech Connect (OSTI)

    Hopper, Nicole; Goldman, Charles; Schlegal, Jeff

    2006-08-01

    In the aftermath of the consumer price shocks and short-term power shortages of the 2000-01 electricity crisis, policymakers and regulators in Western states are placing increased emphasis on integrated resource planning (IRP), resource adequacy and assessment and a diversified portfolio of resources to meet the needs of electricity consumers. In some states, this has led to a resurgence in state and utility commitments to energy efficiency. Increasing interest in acquiring energy efficiency as a power-system resource is also driven by the desire to dampen high growth rates in electricity demand in some Western states, rapid increases in natural gas prices, concerns about the environmental impacts of electricity generation (e.g. water consumption by power plants, air quality), and the potential of energy efficiency to provide utility bill savings for households and businesses (WGA CDEAC 2006). Recognizing the cost-competitiveness and environmental benefits of energy efficiency, the Western Governor's Association (WGA) has set a high priority for energy efficiency, establishing a goal of reducing projected electricity demand by 20% across the West by 2020 in a policy resolution on Clean and Diversified Energy for the West (WGA 2004). Nationally, the need for improved tracking of demand-side resources in load forecasting is formalized in the North American Electric Reliability Council (NERC)'s recently adopted reliability standards, which utilities and regional reliability organizations will need to comply with (NERC 2005a and 2005b). In this study, we examine the treatment of energy efficiency in recent resource plans issued by fourteen investor-owned utilities (IOUs) in the Western United States and Canada. The goals of this study are to: (1) summarize energy-efficiency resources as represented in a large sample of recent resource plans prepared by Western utilities and identify key issues; (2) evaluate the extent to which the information provided in current

  10. Tribes Provide Input on 10-Year Plan for Renewable Energy in the Arctic Region

    Office of Energy Efficiency and Renewable Energy (EERE)

    The DOE Office of Indian Energy hosted a second round of tribal consultations and outreach meetings throughout Alaska in February and March to gather input on the National Strategy for the Arctic Region (NSAR).

  11. Commission Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commission Meetings Commission Meetings Meetings of the Commission to Review the Effectiveness of the National Energy Laboratories October 23, 2015 Commission to Review the Effectiveness of the National Energy Laboratories, October 23, 2015 The final public meeting of the Commission will begin at 1:00 p.m. on October 23, 2015 in the form of a Conference Call. The tentative meeting agenda includes discussion on the draft Final Report of the Commission. The Commissioners will address comments they

  12. UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I

    Office of Legacy Management (LM)

    and Lab Branch Division of Nuclear Materials Safety Docket No. 040-07123 License No. ... SUB-748 file cc wencl: State of New York NATIONAL LEAD COMPANY ?La;R Pile cOpt NUCLEAR ...

  13. European Commission | Open Energy Information

    Open Energy Info (EERE)

    European Commission Name: European Commission Place: Brussels, Belgium Website: ec.europa.euindexen.htm Coordinates: 50.8503396, 4.3517103 Show Map Loading map......

  14. Nuclear Regulatory Commission Issuances

    SciTech Connect (OSTI)

    Not Available

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  15. The application of strategic environmental assessment in a non-mandatory context: Regional transport planning in New Zealand

    SciTech Connect (OSTI)

    McGimpsey, Paul; Morgan, Richard K.

    2013-11-15

    There is no legal mandate for strategic environmental assessment (SEA) in New Zealand. However, a requirement to consider environmental and sustainability issues is a key feature of many statutes, including that relating to regional transport planning. Given this, the research sought to determine whether SEA could be used to improve the incorporation of environmental and sustainability aspects into the regional transport planning process in New Zealand. Existing practice was evaluated, examining what factors currently limiting the consideration of environmental and sustainability issues and to what extent elements of SEA are currently being used. The research culminated in the development of a conceptual model where SEA elements could be incorporated into the existing framework to promote improved consideration of environmental and sustainability issues. The results provide some reassurance about the value of SEA even where its application is not legally mandated. However, it also highlighted some ongoing issues around the integration of SEA in existing frameworks and around the scope of SEA as a decision-aiding tool. -- Highlights: • The research examined whether SEA can provide benefits even where it is not mandated. • The research examined the extent to which SEA elements are currently being used. • A conceptual model was developed to incorporate necessary SEA elements into an existing framework.

  16. An integrated computer modeling environment for regional land use, air quality, and transportation planning

    SciTech Connect (OSTI)

    Hanley, C.J.; Marshall, N.L.

    1997-04-01

    The Land Use, Air Quality, and Transportation Integrated Modeling Environment (LATIME) represents an integrated approach to computer modeling and simulation of land use allocation, travel demand, and mobile source emissions for the Albuquerque, New Mexico, area. This environment provides predictive capability combined with a graphical and geographical interface. The graphical interface shows the causal relationships between data and policy scenarios and supports alternative model formulations. Scenarios are launched from within a Geographic Information System (GIS), and data produced by each model component at each time step within a simulation is stored in the GIS. A menu-driven query system is utilized to review link-based results and regional and area-wide results. These results can also be compared across time or between alternative land use scenarios. Using this environment, policies can be developed and implemented based on comparative analysis, rather than on single-step future projections. 16 refs., 3 figs., 2 tabs.

  17. Nuclear Regulatory Commission issuances

    SciTech Connect (OSTI)

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  18. ATOMIC ENERGY COMMISSION

    Office of Legacy Management (LM)

    ' ATOMIC ENERGY COMMISSION Frank K. Pittman, Director, bivisioa of Waste &&gement and s- portation, Headquarters j CONTAMItUTED RX-AEC-OWNED OR LEASED FACILITIES' This memorandum responds to your TWX certain information on the above subject. the documentation necessary to answer your available due to the records disposal vailing at the time of release or From records that are available and from disc&ions with most familiar with the transfer operations, &have the current

  19. Climate change in the four corners and adjacent regions: Implications for environmental restoration and land-use planning

    SciTech Connect (OSTI)

    Waugh, W.J.

    1995-09-01

    This document contains the workshop proceedings on Climate Change in the Four Corners and Adjacent Regions: Implications for Environmental Restoration and Land-Use Planning which took place September 12-14, 1994 in Grand Junction, Colorado. The workshop addressed three ways we can use paleoenvironmental data to gain a better understanding of climate change and its effects. (1) To serve as a retrospective baseline for interpreting past and projecting future climate-induced environmental change, (2) To differentiate the influences of climate and humans on past environmental change, and (3) To improve ecosystem management and restoration practices in the future. The papers presented at this workshop contained information on the following subjects: Paleoclimatic data from the Pleistocene and Holocene epochs, climate change and past cultures, and ecological resources and environmental restoration. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

  20. UN Economic and Social Commission for Asia and the Pacific (ESCAP...

    Open Energy Info (EERE)

    of the United Nations five regional commissions, and the largest United Nations body serving the Asia-Pacific region with over 600 staff. ... ESCAP works to overcome some...

  1. A Guide to Building Commissioning

    SciTech Connect (OSTI)

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  2. Nuclear Regulatory Commission information digest

    SciTech Connect (OSTI)

    None,

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  3. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect (OSTI)

    1996-07-01

    This document is the US NRC organizational structure and chart as of July 1, 1996. It contains the org charts for the Commission, ACRS, ASLAB, Commission staff offices, Executive Director for Operations, Office of the Inspector General, Program offices, and regional offices.

  4. State action in regional transmission groups

    SciTech Connect (OSTI)

    Rokach, J.Z.

    1994-12-01

    States should participate in coordinated transmission planning through regional transmission groups, while reserving their right to pass upon transmission planning. This would smooth an otherwise difficult transition, as FERC and state regulators seek to facilitate a competitive bulk power market that ignores arbitrary jurisdiction lines. Since the Federal Energy Regulatory Commission issued its Policy Statement on Regional Transmission Groups, two RTG`s, the Western Regional Transmission Association and the Southwest Regional Transmission Association, have gained conditional approval from FERC. A third, the Northwest Regional Transmission Association, files its governing agreement with the Commission, seeking FERC`s approval. Price setting within RTGs and information exchanges involved in planning the grid raise questions of the legality of these collective actions under the antitrust laws. All three agreements allow for exchanges of commercial and planning information, but, conspicuously, do not set transmission prices. For the moment, therefore, antitrust liability for RTGs would arise out of the information exchanges involved in planning the grid. In addition, with FERC pushing for `restructuring` at the wholesale level through open access and the states becoming aggressive in trying to institute competition at the consumer level through retail wheeling, issues of federal-state jurisdiction in transmission have come to the fore.

  5. Nuclear Regulatory Commission | Department of Energy

    Office of Environmental Management (EM)

    Commission Nuclear Regulatory Commission Nuclear Regulatory Commission (25.98 KB) More Documents & Publications What to Expect When Readying to Move Spent Nuclear Fuel from ...

  6. California State Lands Commission | Open Energy Information

    Open Energy Info (EERE)

    Lands Commission Jump to: navigation, search Logo: California State Lands Commission Name: California State Lands Commission Abbreviation: CSLC Address: 100 Howe Ave., Suite 100...

  7. California Coastal Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Logo: California Coastal Commission Name: California Coastal Commission Address: 45 Fremont Street, Suite 2000 Place: San Francisco,...

  8. National Energy Commission (China) | Open Energy Information

    Open Energy Info (EERE)

    Commission (China) Jump to: navigation, search Name: National Energy Commission (China) Place: Beijing References: National Energy Commission (China)1 This article is a stub. You...

  9. Commissioning a materials research laboratory

    SciTech Connect (OSTI)

    SAVAGE,GERALD A.

    2000-03-28

    This presentation covers the process of commissioning a new 150,000 sq. ft. research facility at Sandia National Laboratories. The laboratory being constructed is a showcase of modern design methods being built at a construction cost of less than $180 per sq. ft. This is possible in part because of the total commissioning activities that are being utilized for this project. The laboratory's unique approach to commissioning will be presented in this paper. The process will be followed through from the conceptual stage on into the actual construction portion of the laboratory. Lessons learned and cost effectiveness will be presented in a manner that will be usable for others making commissioning related decisions. Commissioning activities at every stage of the design will be presented along with the attributed benefits. Attendees will hear answers to the what, when, who, and why questions associated with commissioning of this exciting project.

  10. Charter for the Commission to Review the Effectiveness of the National

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Laboratories | Department of Energy Charter for the Commission to Review the Effectiveness of the National Energy Laboratories Charter for the Commission to Review the Effectiveness of the National Energy Laboratories Two phases are planned for the Commission. In Phase 1, the objective of the Commission is to address whether the Department of Energy's (DOE) national laboratories are properly aligned with the Department's strategic priorities; have clear, well understood, and properly

  11. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corporation Docket No. PF14-21-000 BP Alaska LNG, LLC Conoco Phillips Alaska LNG Company ExxonMobil Alaska LNG, LLC TransCanada Alaska Midstream, LP NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED ALASKA LNG PROJECT AND REQUEST FOR COMMENTS ON ENVIRONMENTAL ISSUES (March 4, 2015) The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental impact statement (EIS) that will discuss the environmental impacts of the Alaska LNG

  12. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Port Arthur LNG, LLC and Docket Nos. PF15-18-000 and Port Arthur Pipeline, LLC PF15-19-000 NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED PORT ARTHUR LIQUEFACTION PROJECT AND PORT ARTHUR PIPELINE PROJECT, REQUEST FOR COMMENTS ON ENVIRONMENTAL ISSUES, AND NOTICE OF PUBLIC SCOPING MEETINGS (June 24, 2015) The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental impact statement (EIS) that will discuss the environmental

  13. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SUPPLEMENTAL NOTICE OF PUBLIC SCOPING MEETINGS FOR THE PLANNED ALASKA LNG PROJECT (October 20, 2015) The staff of the Federal Energy Regulatory Commission (FERC or Commission) will conduct additional public scoping meetings as part of their preparation of an environmental impact statement (EIS) for the Alaska LNG Project involving construction and operation of facilities by Alaska Gasline Development Corporation; BP Alaska LNG, LLC; Conoco Phillips Alaska LNG Company; ExxonMobil Alaska LNG, LLC;

  14. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NOTICE OF PUBLIC SCOPING MEETINGS FOR THE PLANNED ALASKA LNG PROJECT (October 8, 2015) The staff of the Federal Energy Regulatory Commission (FERC or Commission) will conduct public scoping meetings as part of their preparation of an environmental impact statement (EIS) for the Alaska LNG Project involving construction and operation of facilities by Alaska Gasline Development Corporation; BP Alaska LNG, LLC; Conoco Phillips Alaska LNG Company; ExxonMobil Alaska LNG, LLC; and TransCanada Alaska

  15. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Trunkline LNG Company, LLC Docket No. PF12-8-000 Trunkline LNG Export, LLC Trunkline Gas Company, LLC SUPPLEMENTAL NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED LAKE CHARLES LIQUEFACTION PROJECT AND REQUEST FOR COMMENTS ON ENVIRONMENTAL ISSUES (March 21, 2013) As previously noticed on September 14, 2012, and supplemented herein, the staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental impact statement (EIS) that will

  16. Commissioning of NSLS-II

    SciTech Connect (OSTI)

    Willeke, F.

    2015-05-03

    NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 1022 photons s-1mm-2mrad-2 (0.1%BW)-1. It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

  17. PRELIMINARY Run Shutdown BL Commissioning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PRELIMINARY Run Shutdown BL Commissioning Maintenance AP SPEAR Down Injector Startup University Holidays Spear Down SPEAR Startup MA Sep Oct 2011 2012 MA Mar Apr May Jun Jul...

  18. Implications of Model Configurations on Capacity Planning Decisions: Scenario Case Studies of the Western Interconnection and Colorado Region using the Resource Planning Model

    Broader source: Energy.gov [DOE]

    In this report, we analyze the impacts of model configuration and detail in capacity expansion models, computational tools used by utility planners looking to find the least cost option for planning the system and by researchers or policy makers attempting to understand the effects of various policy implementations. The present analysis focuses on the importance of model configurations—particularly those related to capacity credit, dispatch modeling, and transmission modeling—to the construction of scenario futures. Our analysis is primarily directed toward advanced tools used for utility planning and is focused on those impacts that are most relevant to decisions with respect to future renewable capacity deployment. To serve this purpose, we develop and employ the NREL Resource Planning Model to conduct a case study analysis that explores 12 separate capacity expansion scenarios of the Western Interconnection through 2030.

  19. SU-E-T-577: Commissioning of a Deterministic Algorithm for External Photon Beams

    SciTech Connect (OSTI)

    Zhu, T; Finlay, J; Mesina, C; Liu, H

    2014-06-01

    Purpose: We report commissioning results for a deterministic algorithm for external photon beam treatment planning. A deterministic algorithm solves the radiation transport equations directly using a finite difference method, thus improve the accuracy of dose calculation, particularly under heterogeneous conditions with results similar to that of Monte Carlo (MC) simulation. Methods: Commissioning data for photon energies 6 15 MV includes the percentage depth dose (PDD) measured at SSD = 90 cm and output ratio in water (Spc), both normalized to 10 cm depth, for field sizes between 2 and 40 cm and depths between 0 and 40 cm. Off-axis ratio (OAR) for the same set of field sizes was used at 5 depths (dmax, 5, 10, 20, 30 cm). The final model was compared with the commissioning data as well as additional benchmark data. The benchmark data includes dose per MU determined for 17 points for SSD between 80 and 110 cm, depth between 5 and 20 cm, and lateral offset of up to 16.5 cm. Relative comparisons were made in a heterogeneous phantom made of cork and solid water. Results: Compared to the commissioning beam data, the agreement are generally better than 2% with large errors (up to 13%) observed in the buildup regions of the FDD and penumbra regions of the OAR profiles. The overall mean standard deviation is 0.04% when all data are taken into account. Compared to the benchmark data, the agreements are generally better than 2%. Relative comparison in heterogeneous phantom is in general better than 4%. Conclusion: A commercial deterministic algorithm was commissioned for megavoltage photon beams. In a homogeneous medium, the agreement between the algorithm and measurement at the benchmark points is generally better than 2%. The dose accuracy for a deterministic algorithm is better than a convolution algorithm in heterogeneous medium.

  20. National Action Plan on Demand Response, June 2010 | Department...

    Energy Savers [EERE]

    Action Plan on Demand Response, June 2010 National Action Plan on Demand Response, June 2010 The Federal Energy Regulatory Commission (FERC) is required to develop the National ...

  1. Commission Meeting- November 4, 2014

    Broader source: Energy.gov [DOE]

    Commission to Review the Effectiveness of the National Energy Laboratories AgendaArgonne National LaboratoryTCS Conference Center9700 S. Cass AveArgonne, IL 60436November 4, 2014

  2. Orlando Utilities Commission- Solar Programs

    Broader source: Energy.gov [DOE]

    The Orlando Utilities Commission (OUC) also offers incentive for solar hot water heating systems. Commercial solar hot water heating systems receive a $0.03 per kWh equivalent. Residential...

  3. u. S. Atomic Energy Commission

    Office of Legacy Management (LM)

    S. Atomic Energy Commission R. 0. Box 30, Ansonia Station New York ES, N. Y. MATERIALS 5+k& hJf Reference: SK:BL Attention: Mr. R. J. Smith Jr. Director Special Materials Division ...

  4. Wisconsin SRF Electron Gun Commissioning

    SciTech Connect (OSTI)

    Bisognano, Joseph J.; Bissen, M.; Bosch, R.; Efremov, M.; Eisert, D.; Fisher, M.; Green, M.; Jacobs, K.; Keil, R.; Kleman, K.; Rogers, G.; Severson, M.; Yavuz, D. D.; Legg, Robert A.; Bachimanchi, Ramakrishna; Hovater, J. Curtis; Plawski, Tomasz; Powers, Thomas J.

    2013-12-01

    The University of Wisconsin has completed fabrication and commissioning of a low frequency (199.6 MHz) superconducting electron gun based on a quarter wave resonator (QWR) cavity. Its concept was optimized to be the source for a CW free electron laser facility. The gun design includes active tuning and a high temperature superconducting solenoid. We will report on the status of the Wisconsin SRF electron gun program, including commissioning experience and first beam measurements.

  5. Risk-Based Data Management System design specifications and implementation plan for the Alaska Oil and Gas Conservation Commission; the Mississippi State Oil and Gas Board; the Montana Board of Oil and Gas Conservation; and the Nebraska Oil and Gas Conservation Commission

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The purpose of this document is to present design specifications and an implementation schedule for the development and implementation of Risk Based Data Management Systems (RBDMS`s) in the states of Alaska, Mississippi, Montana, and Nebraska. The document presents detailed design information including a description of the system database structure, data dictionary, data entry and inquiry screen layouts, specifications for standard reports that will be produced by the system, functions and capabilities (including environmental risk analyses), And table relationships for each database table within the system. This design information provides a comprehensive blueprint of the system to be developed and presents the necessary detailed information for system development and implementation. A proposed schedule for development and implementation also is presented. The schedule presents timeframes for the development of system modules, training, implementation, and providing assistance to the states with data conversion from existing systems. However, the schedule will vary depending upon the timing of funding allocations from the United States Department of Energy (DOE) for the development and implementation phase of the project. For planning purposes, the schedule assumes that initiation of the development and implementation phase will commence November 1, 1993, somewhat later than originally anticipated.

  6. Northwest Alaska Native Association (NANA) Regional Corporation - Strategic Energy Plan, Wind Resource Assessment, and Geothermal Resource Assessment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IS * 1971 Alaska Native Claim Settlement Act (ANCSA) * Created 13 Alaska Native Corporations (ANCs) * Region is 38,000 square large (1/3 of Colorado) * 11 remote villages Formation of  4,800 shareholders in 1971  Shareholders live: * The region * Elsewhere in Alaska * Outside of Alaska  11,400 shareholders today Owners of "The economic future of the NANA region is directly tied to restructuring current energy options and looking towards alternative & renewable sources."

  7. October 6, 2014 Lab Commission Meeting Minutes

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its third meeting at 9:00 AM on October 6, 2014. The Commission members heard a DOE...

  8. December 15, 2014 LAB COMMISSION MEETING MINUTES

    Broader source: Energy.gov [DOE]

    The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its fifth meeting at 10:00 AM on December 15, 2014. Commission Co-Chair Jared Cohon led the meeting. The meeting included two panels: (1) authors of recent reports about the DOE National Labs and (2) a national lab contractor panel. The report authors summarized their respective reports, highlighting concerns related to the relationship between DOE and the labs, research funding and strategy stove-piping, weak links between the labs and market, an inconsistent economic development mission, the difficulty small firms have in accessing labs, the labs’ lack of regional engagement, and DOE and congressional micromanagement of the labs. The lab contractor representatives responded to questions posed by the commissioners related to lab management and the relationship with DOE. Additionally, Patricia Falcone spoke of the important role of the labs in the science and technology enterprise and Alan Leshner talked about the labs and their relationship with the scientific community. Christopher Paine presented his views on transforming the weapons complex. The next meeting will be held February 24 at the Hilton at Mark Center in VA.

  9. Regional Transmission Projects: Finding Solutions

    SciTech Connect (OSTI)

    The Keystone Center

    2005-06-15

    The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association

  10. Commissioning for Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Federal Facilities Commissioning for Federal Facilities Guide describes building commissioning, recommissioning, retrocommissioning, and continuous commissioning for federal facilities. Download the Commissioning for Federal Facilities guide. (2.77 MB) More Documents & Publications Chapter 9: Commissioning the Building Guide to Operating and Maintaining EnergySmart Schools Example Retro-Commissioning Scope of Work to Include Services as Part of an ESPC Investment-Grade Audit

  11. Energy Department Highlights Commissioning of Innovative Fuel...

    Office of Environmental Management (EM)

    Highlights Commissioning of Innovative Fuel Cell System at U.S. Army's Aberdeen Proving Ground Energy Department Highlights Commissioning of Innovative Fuel Cell System at U.S. ...

  12. Regulatory Commission of Alaska | Open Energy Information

    Open Energy Info (EERE)

    includes general information about the RCA and its Commissioners. Commission The Alaska Public Service Commission (APSC) existed from 1960 until 1970. In 1970, the Alaska...

  13. Oregon Water Resources Commission | Open Energy Information

    Open Energy Info (EERE)

    Water Resources Commission Jump to: navigation, search Name: Oregon Water Resources Commission Abbreviation: OWRC Address: 725 Summer Street NE, Suite A Place: Salem, Oregon Zip:...

  14. Colorado Ground Water Commission | Open Energy Information

    Open Energy Info (EERE)

    Colorado Ground Water Commission Jump to: navigation, search Name: Colorado Ground Water Commission Place: Colorado Website: water.state.co.usgroundwater References: Colorado...

  15. State Historical Resources Commission | Open Energy Information

    Open Energy Info (EERE)

    Resources Commission Jump to: navigation, search Name: State Historical Resources Commission Address: 1725 23rd Street, Suite 100 Place: Sacramento, CA Zip: 95816 ParentHolding...

  16. State Land Commission FAQ | Open Energy Information

    Open Energy Info (EERE)

    Land Commission FAQ Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: State Land Commission FAQ Abstract Frequently Asked Questions, California State...

  17. California Energy Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Name: California Energy Commission Address: 1516 Ninth Street, MS-29 Place: Sacramento, CA Zip: 95814-5512 Website: www.energy.ca.gov...

  18. Sandia Energy - Molten Salt Test Loop Commissioning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Energy News EC News & Events Concentrating Solar Power Solar Molten Salt Test Loop Commissioning Previous Next Molten Salt Test Loop Commissioning The Molten Salt...

  19. Arizona Corporation Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Name: Arizona Corporation Commission Abbreviation: ACC Service Territory: Arizona Website: www.azcc.gov EIA Form 861 Data This article is a...

  20. Brazil Interministerial Commission on Global Climate Change ...

    Open Energy Info (EERE)

    Interministerial Commission on Global Climate Change Jump to: navigation, search Name: Brazil Interministerial Commission on Global Climate Change Place: Distrito Federal...

  1. Idaho Public Utilities Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Name: Idaho Public Utilities Commission Address: P.O. Box 83720 Place: Boise, ID Zip: 83720 Website: www.puc.idaho.gov Coordinates:...

  2. Commission.

    National Nuclear Security Administration (NNSA)

    July 2014 NMMSS News is sponsored by the Department of Energy and the Nuclear Regulatory ... and hosted jointly by the Department of Energy (DOE), National Nuclear Security ...

  3. Commission.

    National Nuclear Security Administration (NNSA)

    ... Requests (301) 903-2180 Len.Myers@nnsa.doe.gov Patricia Smith NRC Reconciliation (301) 903-6860 PatriciaR.Smith@nnsa.doe.gov Homepage: http:nnsa.energy.govnmmss Email: ...

  4. Commissioning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Data for the graph courtesy Karl Stum; Summit Engineering Verification and Prestart Checks Functional Testing Opposite Season Testing Trend Analysis Responsibility Shifting from ...

  5. Commission.

    National Nuclear Security Administration (NNSA)

    role in aiding risk- informed decision making in areas related to regulatory functions, international programs, materials management, program management, and financial management. ...

  6. A Ten Step Protocol and Plan for CCS Site Characterization, Based on an Analysis of the Rocky Mountain Region, USA

    SciTech Connect (OSTI)

    McPherson, Brian; Matthews, Vince

    2013-09-15

    This report expresses a Ten-Step Protocol for CO2 Storage Site Characterization, the final outcome of an extensive Site Characterization analysis of the Rocky Mountain region, USA. These ten steps include: (1) regional assessment and data gathering; (2) identification and analysis of appropriate local sites for characterization; (3) public engagement; (4) geologic and geophysical analysis of local site(s); (5) stratigraphic well drilling and coring; (6) core analysis and interpretation with other data; (7) database assembly and static model development; (8) storage capacity assessment; (9) simulation and uncertainty assessment; (10) risk assessment. While the results detailed here are primarily germane to the Rocky Mountain region, the intent of this protocol is to be portable or generally applicable for CO2 storage site characterization.

  7. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1986-11-30

    Functional organization charts for the NRC Commission Offices, Divisions, and Branches are presented.

  8. Commissioning in Federal Buildings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Federal Buildings Commissioning in Federal Buildings Commissioning in Federal Buildings Commissioning is a quality-assurance process used to verify that a building performs according to the original design and intent, and meets the needs of the owners and occupants. The commissioning process also prepares building staff to operate and maintain the building. Federal agencies are required to make sure building systems and equipment are commissioned in new construction and existing buildings.

  9. Work plan for revising the RAMC mine costing methodology. [USA; regional; modifications; based on specific mines reviewed

    SciTech Connect (OSTI)

    Not Available

    1980-06-16

    Based on discussions with the Technical Project Officer and current budget constraints, the approach chosen for improving the RAMC mine costing methodology is as follows: Develop a set of regional model mines (both surface and underground) which reflect mining conditions and preference for each major producing district; develop regional equations relating capital and operating costs to various system components; and develop the input data necessary for each estimating relationship. To date, engineering work-ups for all model mines have been prepared, a preliminary surface mine cost model has been developed and steps have been taken to reduce EIA-7 data for use in developing an underground cost model. Descriptions of the surface and underground model mines are contained in Appendices A and B, respectively, and the preliminary surface mine cost model is contained in Appendix C.

  10. Request for Information: Assistance in Target Setting and Strategic Planning for Renewable Energy Deployment at the State and Regional Level

    Broader source: Energy.gov [DOE]

    In order to comply with the Environmental Protection Agency’s Clean Power Plan, states are required to reduce greenhouse gas emissions. One option for compliance is replacing retiring fossil generation with solar-generated electricity. Currently, 29 states, three territories, and Washington, D.C. have renewable portfolio standards (RPS), which have proven to be an effective regulatory means of expanding solar and other clean energy. More than half of the RPSs will reach their peak by 2020, which is driving states to update or create new solar targets. The purpose of this RFI is to solicit feedback from state-level entities, utilities, the solar industry, energy companies, academia, research laboratories, and other stakeholders on issues related to the development of new solar energy targets and deployment strategies at the state level.

  11. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect (OSTI)

    1996-08-19

    This document is the organizational chart for the US NRC. It contains organizational structure and functional statements for the following: (1) the Commission, (2) committees and boards, (3) staff offices, (4) office of the Inspector General, (5) executive director for operations, (6) program offices, and (7) regional offices.

  12. Report to the Legislature on the California Energy Commission's Geothermal Development Grant Program for Local Governments

    SciTech Connect (OSTI)

    Not Available

    1983-04-01

    This report documents the California Energy Commission's administration of its Geothermal Development Grant Program for Local Governments. The Energy Commission established this program as a result of the passage of Assembly Bill 1905 (Bosco) in 1980. This legislation established the mechanism to distribute the state's share of revenues received from the leasing of federal mineral reserves for geothermal development. The federal government deposits these revenues in the Geothermal Resources Development Account (GRDA) created by AB 1905. The state allocates funds from the GRDA to the California Parklands and Renewable Resources Investment Fund, the counties of origin where the federal leases are located, and the Energy Commission. The legislation further directs the Energy Commission to disburse its share as grants to local governments to assist with the planning and development of geothermal resources. Activities which are eligible for funding under the Energy Commission's grant program include resource development projects, planning and feasibility studies, and activities to mitigate the impacts of existing geothermal development.

  13. R&D ERL: G5 test and commissioning plan

    SciTech Connect (OSTI)

    Kayran, D.; Pozdeyev, E.

    2010-02-10

    Gun-to-5-cell cavity (G5) setup (Fig 1-2) can be considered as the first stage of the final BNL ERL design. The goal of the G5 setup is to test critical ERL components with the beam and characterize the beam produced by the gun. Also, this test will be used to assess effectiveness of the zigzag merger, which will be installed later in the ERL setup. The major components under the test will include the SRF gun, the five-cell SRF cavity, vacuum components, parts of the control and diagnostic systems. G5 is designed to measure the following beam parameters: (1) projected bunch emittance (?) and Twiss parameters ({alpha}, {beta}); (2) slice emittance; (3) bunch length; and (4) longitudinal and transverse halo.

  14. Commission to Review the Effectiveness of the National Energy Laboratories

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TJ Glauthier 2 3 2000 2015 Price 75% Mw 200 x Global PV Shipments Commission to Review the Effectiveness of the National Energy Laboratories 4 5 # 56 Tell Congress What You Do 6 The FFRDC Role 7 DOE Labs What How Annual Operating Plan 8 Pre-approval Technology Transfer * In the Mission * Reinvent Processes * Approvals Accountability * Vouchers * Umbrella CRADAs * Tech Maturation * LVOC * Critical Materials Inst * Entrepreneurial Leave * Cyclotron Road 9 Labs As A System * Later Life Cycle -

  15. Blue Ribbon Commission Tour of Hanford Site

    SciTech Connect (OSTI)

    Paul Saueressig

    2010-07-14

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  16. Opening Remarks, California Energy Commission Overview

    Broader source: Energy.gov (indexed) [DOE]

    Fuels and Transportation Division California Energy Commission May 14, 2014 1 C A L ... A E N E R G Y C O M M I S S I O N * The California Energy Commission is the state's ...

  17. Oregon Environmental Quality Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Name: Oregon Environmental Quality Commission Address: 811 SW 6th Avenue Place: Portland, Oregon Zip: 97204-1390 Phone Number: 503-229-5301...

  18. Blue Ribbon Commission Tour of Hanford Site

    ScienceCinema (OSTI)

    Paul Saueressig

    2010-09-01

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  19. LINE Commission Visits Idaho National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LINE Commission Visits Idaho National Laboratory Members of the state of Idaho�s Leadership in Nuclear Energy (LINE) Commission recently visited the Idaho National Laboratory and related DOE-Idaho cleanup facilities. These photos show commission members at the Materials and Fuels Complex, where Steve Marschman from INL talks to the commission members, and the Advanced Mixed Waste Treatment Facility. At the AMWTP, members saw the supercompactor as Facility Manager Jeremy Hampton explained how

  20. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1990-08-15

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  1. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1990-04-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  2. Nuclear Regulatory Commission 1989 Information Digest

    SciTech Connect (OSTI)

    None,

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide.

  3. May 22, 2015 LAB COMMISSION MEETING MINUTES

    Broader source: Energy.gov [DOE]

    The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its ninth meeting at 9:00 AM on May 22, 2015. Commission Co-Chair Jared Cohon led the meeting. The meeting included discussion with lab directors; technology transfer coordinators; Bay area industrial partners; and site office management. The discussion was followed by an opportunity for public comment.

  4. Beyond Commissioning: The Role of Automation

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas

    2005-02-01

    This article takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that's performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. The article then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

  5. Automated Demand Response and Commissioning

    SciTech Connect (OSTI)

    Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Bourassa, Norman

    2005-04-01

    This paper describes the results from the second season of research to develop and evaluate the performance of new Automated Demand Response (Auto-DR) hardware and software technology in large facilities. Demand Response (DR) is a set of activities to reduce or shift electricity use to improve the electric grid reliability and manage electricity costs. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. We refer to this as Auto-DR. The evaluation of the control and communications must be properly configured and pass through a set of test stages: Readiness, Approval, Price Client/Price Server Communication, Internet Gateway/Internet Relay Communication, Control of Equipment, and DR Shed Effectiveness. New commissioning tests are needed for such systems to improve connecting demand responsive building systems to the electric grid demand response systems.

  6. HYTEST Phase I Facility Commissioning and Modeling

    SciTech Connect (OSTI)

    Lee P. Shunn; Richard D. Boardman; Shane J. Cherry; Craig G. Rieger

    2009-09-01

    The purpose of this document is to report the first year accomplishments of two coordinated Laboratory Directed Research and Development (LDRD) projects that utilize a hybrid energy testing laboratory that couples various reactors to investigate system reactance behavior. This work is the first phase of a series of hybrid energy research and testing stations - referred to hereafter as HYTEST facilities – that are planned for construction and operation at the Idaho National Laboratory (INL). A HYTEST Phase I facility was set up and commissioned in Bay 9 of the Bonneville County Technology Center (BCTC). The purpose of this facility is to utilize the hydrogen and oxygen that is produced by the High Temperature Steam Electrolysis test reactors operating in Bay 9 to support the investigation of kinetic phenomena and transient response of integrated reactor components. This facility provides a convenient scale for conducting scoping tests of new reaction concepts, materials performance, new instruments, and real-time data collection and manipulation for advance process controls. An enclosed reactor module was assembled and connected to a new ventilation system equipped with a variable-speed exhaust blower to mitigate hazardous gas exposures, as well as contract with hot surfaces. The module was equipped with a hydrogen gas pump and receiver tank to supply high quality hydrogen to chemical reactors located in the hood.

  7. PP-54 Ontario Hydro Electric Power Commission | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Ontario Hydro Electric Power Commission PP-54 Ontario Hydro Electric Power Commission Presidential Permit authorizing Ontario Hydro Electric Power Commission to construct, ...

  8. Energy Audit and Retro-Commissioning Policies for Public and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Audit and Retro-Commissioning Policies for Public and Commercial Buildings Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings Retro-Commissioning...

  9. PP-13 Federal Power Commission | Department of Energy

    Office of Environmental Management (EM)

    3 Federal Power Commission PP-13 Federal Power Commission Presidential permit authorizing Federal Power Commission to construct, operate, and maintain electric transmission ...

  10. Hawaii State Land Use Commission | Open Energy Information

    Open Energy Info (EERE)

    Hawaii State Land Use Commission Jump to: navigation, search Name: State Land Use Commission Abbreviation: LUC Place: Honolulu, Hawaii References: State Land Use Commission -...

  11. Arizona Oil and Gas Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Logo: Arizona Oil and Gas Commission Name: Arizona Oil and Gas Commission Address: 416 W. Congress Street, Suite 100 Place: Arizona Zip:...

  12. Energy Planning

    Broader source: Energy.gov (indexed) [DOE]

    Energy Planning Agenda * What is energy planning? * The process * The plan * Strategic Energy Planning (SEP) Workbook * Other resources 2 What is Energy Planning? * Brings desired ...

  13. Commissioning Guidance for ESPCs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidance for ESPCs Commissioning Guidance for ESPCs Document provides a description of how commissioning in energy savings performance contract (ESPC) projects can achieve the objective of meeting or exceeding facility performance requirements by optimizing the operation and efficiency of building systems and equipment. Download the Commissioning Guidance. (316.39 KB) More Documents & Publications FEMP Comprehensive ESPC Workshop Presentations Investment-Grade Audit Kickoff Meeting Sample

  14. NANA Strategic Energy Plan & Energy Options Analysis

    SciTech Connect (OSTI)

    Jay Hermanson; Brian Yanity

    2008-12-31

    NANA Strategic Energy Plan summary NRC, as an Alaska Native Corporation, has committed to addressing the energy needs for its shareholders. The project framework calls for implicit involvement of the IRA Councils in the Steering Committee. Tribal Members, from the NRC to individual communities, will be involved in development of the NANA Energy Plan. NRC, as the lead tribal entity, will serve as the project director of the proposed effort. The NRC team has communicated with various governmental and policy stakeholders via meetings and discussions, including Denali Commission, Alaska Energy Authority, and other governmental stakeholders. Work sessions have been initiated with the Alaska Village Electric Cooperative, the NW Arctic Borough, and Kotzebue Electric Association. The NRC Strategic Energy Plan (SEP) Steering committee met monthly through April and May and weekly starting in June 2008 in preparation of the energy summit that was held from July 29-31, 2008. During preparations for the energy summit and afterwards, there was follow through and development of project concepts for consideration. The NANA regional energy summit was held from July 29-31, 2008, and brought together people from all communities of the Northwest Arctic Borough. The effort was planned in conjunction with the Alaska Energy Authority’s state-wide energy planning efforts. Over $80,000 in cash contributions was collected from various donors to assist with travel from communities and to develop the summit project. Available funding resources have been identified and requirements reviewed, including the Denali Commission, U.S. Dept. of Agriculture, and the Alaska Energy Authority. A component of the overall plan will be a discussion of energy funding and financing. There are current project concepts submitted, or are ready for submittal, in the region for the following areas: • Wind-diesel in Deering, Buckland, Noorik, and Kiana areas; potential development around Red Dog mine.

  15. Navajo-Hopi Land Commission Renewable Energy Development Project (NREP)

    SciTech Connect (OSTI)

    Thomas Benally, Deputy Director,

    2012-05-15

    The Navajo Hopi Land Commission Office (NHLCO), a Navajo Nation executive branch agency has conducted activities to determine capacity-building, institution-building, outreach and management activities to initiate the development of large-scale renewable energy - 100 megawatt (MW) or larger - generating projects on land in Northwestern New Mexico in the first year of a multi-year program. The Navajo Hopi Land Commission Renewable Energy Development Project (NREP) is a one year program that will develop and market a strategic business plan; form multi-agency and public-private project partnerships; compile site-specific solar, wind and infrastructure data; and develop and use project communication and marketing tools to support outreach efforts targeting the public, vendors, investors and government audiences.

  16. Harrods commissions new CHP station

    SciTech Connect (OSTI)

    Mullins, P.

    1994-04-01

    Three new combined heat and power (CHP) sets have recently been commissioned at Harrods, the world-famous department store in the heart of London's fashionable Knightsbridge district. The sets provide all the electricity needed by the store for lighting, heating and air-conditioning and are powered by Ruston 6RK270 turbocharged, charge-air-cooled diesel engines each producing 1392 kW at 750 r/min. These high power-to-weight ratio units were chosen in view of severe engine room space limitations. Low-grade waste heat is extracted from the engine jacket water to preheat water for three new boilers supplying some 1600 kg/h of steam for process heat to the store. The engines drive Brush BJS HW 10 100/8 alternators and are fully automatic in operation through a Regulateurs Europa control system. Some 600 sensors feed data into a Satchwell Building Management System (BMS). In the event of a breakdown, the engine control system can be switched to manual. 5 figs.

  17. SNS BEAM COMMISSIONING TOOLS AND EXPERIENCE

    SciTech Connect (OSTI)

    Shishlo, Andrei P; Galambos, John D

    2008-01-01

    The Spallation Neutron Source (SNS) successfully met the primary construction project completion milestones in April 2006. An important ingredient of this successful commissioning was the development and use of software tools. With the increasing digitalization of beam diagnostics and increasing complexity of Integrated Control Systems of large accelerators, the need for high level software tools is critical for smooth commissioning. At SNS a special Java based infrastructure called XAL was prepared for beam commissioning. XAL provides a hierarchal view of the accelerator, is data base configured, and includes a physics model of the beam. This infrastructure and individual applications development along with a historical time line of the SNS commissioning will be discussed.

  18. Nevada Public Utilities Commission | Open Energy Information

    Open Energy Info (EERE)

    Name: Nevada Public Utilities Commission Abbreviation: NPUC Address: Southern Nevada Office, 9075 West Diablo Drive, Suite 250 Place: Las Vegas, Nevada Zip: 89148 Phone Number:...

  19. Sandia Contributes to International Electrotechnical Commission...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Commission (IEC) Committee on Wind Turbine Availability to develop three specifications for IEC-61400-26-the standard that addresses wind turbine and wind-plant availability. ...

  20. Telephone. Federal Communications Commission. Marlene H. Dortch...

    Broader source: Energy.gov (indexed) [DOE]

    Commission amends 47 CFR parts 20 and 54 as follows: PART 20-COMMERCIAL MOBILE RADIO SERVICES 1. The authority citation for part 20 continues to read as follows:...

  1. United States Atomic Energy Commission formed

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Commission failed to come to grips with the growing nuclear weapons problem, the United States worked to establish its own formal organization. The transition from...

  2. Texas Railroad Commission - Pollution Discharge Regulations ...

    Open Energy Info (EERE)

    Not Provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Texas Railroad Commission - Pollution Discharge Regulations Citation...

  3. Utah Labor Commission | Open Energy Information

    Open Energy Info (EERE)

    The Utah Labor Commission is the regulatory agency responsible for preserving the balance established by the legislature for protecting the health, safety, and economic...

  4. ASTM PV INSTALLATON COMMISSIONING, OPERATIONS & MAINTENNCE (ICOMP...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ASTM PV INSTALLATON COMMISSIONING, OPERATIONS & MAINTENNCE (ICOMP) STANDARD PRACTICE ... which maps out the intent of the standard including incorporations of existing ...

  5. Michigan Public Service Commission | Open Energy Information

    Open Energy Info (EERE)

    of the Michigan Public Service Commission is to grow Michigan's economy and enhance the quality of life of its communities by assuring safe and reliable energy,...

  6. Illinois Commerce Commission | Open Energy Information

    Open Energy Info (EERE)

    Commerce Commission Place: Springfield, Illinois Zip: 62701 Product: Regulator of public utilities and transportation in Illinois. Coordinates: 42.640925, -88.413644...

  7. Colorado Public Utilities Commission | Open Energy Information

    Open Energy Info (EERE)

    CBONDORA1251633139779 Retrieved from "http:en.openei.orgwindex.php?titleColoradoPublicUtilitiesCommission&oldid886925" Feedback Contact needs updating Image needs...

  8. New Mexico Preservation Commission | Open Energy Information

    Open Energy Info (EERE)

    Commission Jump to: navigation, search Name: New Mexico Preservation Division Abbreviation: HPD Address: Bataan Memorial Building, 407 Galisteo Street, Suite 236 Place: Santa Fe,...

  9. Hawaii Public Utilities Commission | Open Energy Information

    Open Energy Info (EERE)

    Name: Hawaii Public Utility Commission Address: 465 South King Street 103 Place: Honolulu, Hawaii Zip: 96813 Coordinates: 21.3053513, -157.85857 Show Map Loading map......

  10. Site Sustainability Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Regional and Local Planning ......10.2 Emergency Response Procedures and ... the prospects and problems of post-remediation care ...

  11. Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory Commission

    Office of Legacy Management (LM)

    111989 Mr. John Kinneman, Chief Nuclear Materfals Branch Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia. Pennsylvania 19406 Dear Mr. Kinneman: -;' .-. 'W Enclosed are the copfes of the final ORNL survey reports on the radiologlcal Surveys conducted on three Teterboro, New Jersey properties; Metpath Incorporated, Allied Aerospace Corporatio; and Sumftomo Machinery Corporation. Copies of these reports have &en sent directly to the owners by our survey contractor Oak

  12. Automated Commissioning for Lower-Cost, Widely Deployed Building Commissioning of the Future

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas

    2007-01-31

    This book chapter takes a brief look at the benefits of building commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems.

  13. Courts and Commissions: Fish or foul

    SciTech Connect (OSTI)

    Radford, B.W.

    1993-10-15

    Hydropower is under attack everywhere you look. It started back in the sixties during the battle over Arizona's Glen Canyon Dam. That case purportedly ended in a compromise with the Sierra Club to save the Grand Canyon from hydro development. But once built, the dam played havoc with Colorado River levels, disrupting rafting trips for Grand Canyon tourists. Even Barry Goldwater was later heard to rue the Glen Canyon project. Marc Reisner's 1986 book, Cadillac Desert, galvanized the antihydro faction. A few years later, calls arose for the City of San Francisco to dismantle its O'Shaughnessy Dam across the Hetch Hetchy Valley in the Sierra Nevada, just 15 miles north of famed Yosemite. That move failed. (Maybe San Francisco's oddball reputation had something to do with the result). But now we hear of plans underway to tear down dams on the Elwah River in Washington State's Olympic National Park, to reclaim lost salmon spawning grounds and return the parks to its natural state. This time the dam busters may win. These events are not unconnected. Strung together, they reveal a change in the popular opinion of how rivers, streams, and coastlines contribute to our economic well-being, and how the federal government should manage those economic resources. Federal hydropower control was born to govern our navigable waterways. It grew up as a tool to speed electrification and develop mining and logging. But forces today are seeking to make federal hydropower law more sympathetic to wildlife preservation. They argue that wildlife represents a national economic resource - no less so than timber, minerals, and shipping. This view is winning support from those in high positions, including the Chair of the Federal Energy Regulatory Commission, Elizabeth Moler.

  14. CMS Jet and Missing $E_T$ Commissioning

    SciTech Connect (OSTI)

    Elvira, V.Daniel; /Fermilab

    2009-01-01

    We describe how jets and E{sub T} are defined, reconstructed, and calibrated in CMS, as well as how the CMS detector performs in measuring these physics objects. Performance results are derived from the CMS simulation application, based on Geant4, and also from noise and cosmic commissioning data taken before the first collision event was recorded by CMS in November 2009. A jet and E{sub T} startup plan is in place which includes a data quality monitoring and prompt analysis task force to identify and fix problems as they arise.

  15. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Gulf LNG Liquefaction Company, LLC Docket No. PF13-4-000 Gulf LNG Energy, LLC Gulf LNG Pipelines, LLC NOTICE OF EXTENSION OF TIME (August 27, 2014) On July 31, 2014, the Commission issued a "Notice of Intent to Prepare an Environmental Impact Statement for the Planned Gulf LNG Liquefaction Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting" (NOI). The NOI identified September 1, 2014 as the close of the scoping period. It has come to our

  16. Magnetic Resonance Imaging-Based Target Volume Delineation in Radiation Therapy Treatment Planning for Brain Tumors Using Localized Region-Based Active Contour

    SciTech Connect (OSTI)

    Aslian, Hossein; Sadeghi, Mahdi; Mahdavi, Seied Rabie; Babapour Mofrad, Farshid; Astarakee, Mahdi; Khaledi, Navid; Fadavi, Pedram

    2013-09-01

    Purpose: To evaluate the clinical application of a robust semiautomatic image segmentation method to determine the brain target volumes in radiation therapy treatment planning. Methods and Materials: A local robust region-based algorithm was used on MRI brain images to study the clinical target volume (CTV) of several patients. First, 3 oncologists delineated CTVs of 10 patients manually, and the process time for each patient was calculated. The averages of the oncologists’ contours were evaluated and considered as reference contours. Then, to determine the CTV through the semiautomatic method, a fourth oncologist who was blind to all manual contours selected 4-8 points around the edema and defined the initial contour. The time to obtain the final contour was calculated again for each patient. Manual and semiautomatic segmentation were compared using 3 different metric criteria: Dice coefficient, Hausdorff distance, and mean absolute distance. A comparison also was performed between volumes obtained from semiautomatic and manual methods. Results: Manual delineation processing time of tumors for each patient was dependent on its size and complexity and had a mean (±SD) of 12.33 ± 2.47 minutes, whereas it was 3.254 ± 1.7507 minutes for the semiautomatic method. Means of Dice coefficient, Hausdorff distance, and mean absolute distance between manual contours were 0.84 ± 0.02, 2.05 ± 0.66 cm, and 0.78 ± 0.15 cm, and they were 0.82 ± 0.03, 1.91 ± 0.65 cm, and 0.7 ± 0.22 cm between manual and semiautomatic contours, respectively. Moreover, the mean volume ratio (=semiautomatic/manual) calculated for all samples was 0.87. Conclusions: Given the deformability of this method, the results showed reasonable accuracy and similarity to the results of manual contouring by the oncologists. This study shows that the localized region-based algorithms can have great ability in determining the CTV and can be appropriate alternatives for manual approaches in brain cancer.

  17. Automated Commissioning for Lower-cost, Widely Deployed Building Commissioning of the Future

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas

    2011-08-16

    This chapter takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that is performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. This chapter then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

  18. Instrumented home energy rating and commissioning

    SciTech Connect (OSTI)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-05-01

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify deficiencies or to correct them. Solving this problem requires field performance evaluations using appropriate and agreed upon procedures in the form of a new process called residential commissioning. The purpose of this project is to develop and document these procedures and to demonstrate the value that applying them could provide in both new and existing California houses. This project has four specific objectives: to develop metrics and diagnostics for assessing house performance, to provide information on the potential benefits of commissioning using a whole-house approach, to develop programmatic guidelines for commissioning, and to conduct outreach efforts to transfer project results to industry stakeholders. The primary outcomes from this project are the development of residential commissioning guidelines and the analytical confirmation that there are significant potential benefits associated with commissioning California houses, particularly existing ones. In addition, we have made substantial advances in understanding the accuracy and usability of diagnostics for commissioning houses. In some cases, we have been able to work with equipment manufacturers to improve these aspects of their diagnostic tools. These outcomes provide a solid foundation on which to build a residential commissioning program in California. We expect that a concerted effort will be necessary to integrate such a program with existing building industry efforts and to demonstrate its use in the field.

  19. TU-C-BRE-05: Clinical Implications of AAA Commissioning Errors and Ability of Common Commissioning ' Credentialing Procedures to Detect Them

    SciTech Connect (OSTI)

    McVicker, A; Oldham, M; Yin, F; Adamson, J

    2014-06-15

    Purpose: To test the ability of the TG-119 commissioning process and RPC credentialing to detect errors in the commissioning process for a commercial Treatment Planning System (TPS). Methods: We introduced commissioning errors into the commissioning process for the Anisotropic Analytical Algorithm (AAA) within the Eclipse TPS. We included errors in Dosimetric Leaf Gap (DLG), electron contamination, flattening filter material, and beam profile measurement with an inappropriately large farmer chamber (simulated using sliding window smoothing of profiles). We then evaluated the clinical impact of these errors on clinical intensity modulated radiation therapy (IMRT) plans (head and neck, low and intermediate risk prostate, mesothelioma, and scalp) by looking at PTV D99, and mean and max OAR dose. Finally, for errors with substantial clinical impact we determined sensitivity of the RPC IMRT film analysis at the midpoint between PTV and OAR using a 4mm distance to agreement metric, and of a 7% TLD dose comparison. We also determined sensitivity of the 3 dose planes of the TG-119 C-shape IMRT phantom using gamma criteria of 3% 3mm. Results: The largest clinical impact came from large changes in the DLG with a change of 1mm resulting in up to a 5% change in the primary PTV D99. This resulted in a discrepancy in the RPC TLDs in the PTVs and OARs of 7.1% and 13.6% respectively, which would have resulted in detection. While use of incorrect flattening filter caused only subtle errors (<1%) in clinical plans, the effect was most pronounced for the RPC TLDs in the OARs (>6%). Conclusion: The AAA commissioning process within the Eclipse TPS is surprisingly robust to user error. When errors do occur, the RPC and TG-119 commissioning credentialing criteria are effective at detecting them; however OAR TLDs are the most sensitive despite the RPC currently excluding them from analysis.

  20. Preliminary Comments on Compliance Plan and Request for Clarification or,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in the Alternative, Rehearing of the District of Columbia Public Service Commission | Department of Energy Comments on Compliance Plan and Request for Clarification or, in the Alternative, Rehearing of the District of Columbia Public Service Commission Preliminary Comments on Compliance Plan and Request for Clarification or, in the Alternative, Rehearing of the District of Columbia Public Service Commission Docket No. EO-05-01: Pursuant to Order No. 202-05-3, issued by the Department of

  1. Community Commitment Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    extends Community Commitment Plan September 18, 2012 LANS Board of Governors extends Community Commitment Plan The Los Alamos National Security, LLC Board of Governors recently voted to extend its Community Commitment Plan for one year. The plan invests $3 million of the company's management fee each year in regional education, economic development and community giving programs. It is managed by LANL's Community Programs Office and was launched in 2006 when LANS won the prime contract to manage

  2. National Labs Commission Phase I Meeting Schedule

    Broader source: Energy.gov [DOE]

    The Commission meets monthly to gather information that will inform its study. Public meetings allow for public participation.  Individuals who would like to attend must RSVP to Karen Gibson,...

  3. The Atomic Energy Commission By Alice Buck

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Atomic Energy Commission By Alice Buck July 1983 U.S. Department of Energy Office of Management Office of the Executive Secretariat Office of History and Heritage Resources 1 Introduction Almost a year after World War II ended, Congress established the United States Atomic Energy Commission to foster and control the peacetime development of atomic science and technology. Reflecting America's postwar optimism, Congress declared that atomic energy should be employed not only in the Nation's

  4. SWPF System Turnover from Construction to Commissioning

    Office of Environmental Management (EM)

    PARSONS SALT WASTE PROCESSING FACILITY PROJECT PROCEDURE Procedure Number: PP-CM-8103 Procedure Title: SWPF System Turnover from Construction to Commissioning Revision: 2 (Complete Rewrite - No Revision Bars Used) Change: N/A Document Owner: Skip Singer Effective Date: 05/23/2014 Document Approver: _ _ _ _ S _ki_ ._.._p_S _i_ n_._.g'- er _ _ _ _ 1.0 PURPOSE/SCOPE COMMISSIONING AND TESTING MANAGER This Salt Waste Processing Facility (SWPF) Project Procedure (PP) establishes requirements and

  5. The makings of a regional transmission group

    SciTech Connect (OSTI)

    Peterson, H.

    1994-04-15

    The Southwest Regional Transmission Association (SWRTA) plans to file this month at the Federal Energy Regulatory Commission (FERC) for recognition as a regional transmission group (RTG), pursuant to the FERC's July 1993 policy statement on RTGs. As the provision of electricity becomes less regulated and more competitive, many industry observers expect RTGs to play a key role in increasing the efficiency of our nation's electricity supply system. What exactly is an RTG There are as many definitions as there are interested parties. SWRTA's working group has spent over two years turning an idea into an RTG. Along the way they have learned a few important things about the FERC, congressional intent, the amended Federal Power Act, the dynamics of large groups, and fairness. This article describes the creation of the SWRTA RTG.

  6. Energy Department Issues Draft Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities procurement is one of the four procurements that resulted from the Idaho Site Office of Environmental Management Post FY 2015 Acquisition Planning.

  7. MARCH 24, 2015 LAB COMMISSION MEETING MINUTES | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its seventh meeting at 10:30 AM on March 24, 2015. Commission Co-Chair TJ...

  8. FEBRUARY 24, 2015 LAB COMMISSION MEETING MINUTES | Department...

    Broader source: Energy.gov (indexed) [DOE]

    The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its sixth meeting at 9:00 AM on February 24, 2015. Commission Co-Chair...

  9. SU-D-BRE-03: Dosimetric Impact of In-Air Spot Size Variations for Commissioning a Room-Matched Beam Model for Pencil Beam Scanning Proton Therapy

    SciTech Connect (OSTI)

    Zhang, Y; Giebeler, A; Mascia, A; Piskulich, F; Perles, L; Lepage, R; Dong, L

    2014-06-01

    Purpose: To quantitatively evaluate dosimetric consequence of spot size variations and validate beam-matching criteria for commissioning a pencil beam model for multiple treatment rooms. Methods: A planning study was first conducted by simulating spot size variations to systematically evaluate dosimetric impact of spot size variations in selected cases, which was used to establish the in-air spot size tolerance for beam matching specifications. A beam model in treatment planning system was created using in-air spot profiles acquired in one treatment room. These spot profiles were also acquired from another treatment room for assessing the actual spot size variations between the two treatment rooms. We created twenty five test plans with targets of different sizes at different depths, and performed dose measurement along the entrance, proximal and distal target regions. The absolute doses at those locations were measured using ionization chambers at both treatment rooms, and were compared against the calculated doses by the beam model. Fifteen additional patient plans were also measured and included in our validation. Results: The beam model is relatively insensitive to spot size variations. With an average of less than 15% measured in-air spot size variations between two treatment rooms, the average dose difference was ?0.15% with a standard deviation of 0.40% for 55 measurement points within target region; but the differences increased to 1.4%1.1% in the entrance regions, which are more affected by in-air spot size variations. Overall, our single-room based beam model in the treatment planning system agreed with measurements in both rooms < 0.5% within the target region. For fifteen patient cases, the agreement was within 1%. Conclusion: We have demonstrated that dosimetrically equivalent machines can be established when in-air spot size variations are within 15% between the two treatment rooms.

  10. July 18, 2014 Commission Meeting Minutes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 18, 2014 Commission Meeting Minutes July 18, 2014 Commission Meeting Minutes This meeting was the inaugural meeting of the Commission to Review the Effectiveness of the National Energy Laboratories (Commission). The Commission members heard opening remarks by Secretary Moniz and Co-Chairs TJ Glauthier and Jared Cohon. The next agenda item was the charge from the joint Appropriations Staff - Subcommittee on Energy and Water Development to the Commission. Dimitri Kusnezov briefed the

  11. DRAFT FINAL REPORT-COMMISSION TO REVIEW THE EFFECTIVENESS OF THE NATIONAL ENERGY LABORATORIES

    Broader source: Energy.gov [DOE]

    The Commission has reviewed comments received during the public comment period and revised its draft Final Report Volumes 1 and 2 for final consideration and approval. The revised version of the draft Final Report is available for download below. A public conference call has been set for 1:00 pm, Oct 23rd to discuss the comments received, to receive additional public comment, and to approve the final report. Further details regarding the conference call can be found here and in the Federal Register. Section 319 of the Consolidated Appropriations Act, 2014 (Public Law No. 113-76) directed the Secretary of Energy to establish the Commission to Review the Effectiveness of the National Energy Laboratories. The Commission was charged with reviewing the 17 Department of Energy (DOE) National Laboratories. It was established in May 2014 and held monthly meetings from July 2014 to July 2015. Congress directed the Commission to evaluate the laboratories in terms of their alignment with the Departments strategic priorities, duplication, ability to meet current and future energy and national security challenges, size, and support of other Federal agencies. The Commission was also to review the efficiency and effectiveness of the laboratories, including assessing overhead costs and the impact of DOEs oversight and management approach. Lastly, Congress had several specific questions related to the use of laboratory directed research and development (LDRD) such as the effectiveness of the Departments oversight approach and the extent to which LDRD funding supports recruiting and retention of qualified staff. The Commission separated its charge into two phases. Phase 1 focused on the mission and strategic planning of the laboratories and Phase 2 targets the operation and oversight of the laboratory system. LDRD as it relates to the issues outlined above was considered in both phases of the Commissions task. The Commission issued an Interim Report in February 2015 with its

  12. Guernsey Renewable Energy Commission GREC | Open Energy Information

    Open Energy Info (EERE)

    Renewable Energy Commission GREC Jump to: navigation, search Name: Guernsey Renewable Energy Commission (GREC) Place: St. Martin, Guernsey, Channel Islands, United Kingdom Zip: GY1...

  13. Memorandum on the Interim Report of the Commission to Review...

    Office of Environmental Management (EM)

    the Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories Memorandum on the Interim Report of the Commission to Review the Effectiveness...

  14. Public Service Commission of Wisconsin | Open Energy Information

    Open Energy Info (EERE)

    Commission of Wisconsin Jump to: navigation, search Name: Public Service Commission of Wisconsin Address: 610 North Whitney Way Place: Madison, Wisconsin Zip: 53707-7854 Phone...

  15. Arizona Const. Art.15 - The Corporation Commission | Open Energy...

    Open Energy Info (EERE)

    Arizona Const. Art.15 - The Corporation CommissionLegal Abstract This article sets forth the Constitutional provisions governing the Arizona Corporations Commission. Published...

  16. San Francisco Bay Conservation and Development Commission | Open...

    Open Energy Info (EERE)

    Conservation and Development Commission Jump to: navigation, search Logo: San Francisco Bay Conservation and Development Commission Name: San Francisco Bay Conservation and...

  17. Public Utility Commission of Texas | Open Energy Information

    Open Energy Info (EERE)

    Public Utility Commission of Texas Name: Public Utility Commission of Texas Address: 1701 N. Congress Avenue Place: Austin, Texas Zip: 78701 Year Founded: 1975 Website:...

  18. US Nuclear Regulatory Commission Input to DOE Request for Information...

    Energy Savers [EERE]

    US Nuclear Regulatory Commission Input to DOE Request for Information Smart Grid Implementation Input US Nuclear Regulatory Commission Input to DOE Request for Information Smart ...

  19. OSTIblog Articles in the Commission on Science and Technology...

    Office of Scientific and Technical Information (OSTI)

    Commission on Science and Technology for Development Topic WorldWideScience Opens ... of the United Nations' Commission on Science and Technology for Development (CSTD). ...

  20. ENERGY STAR Guide to Retro-Commissioning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Federal Energy Savings Performance Contracts Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings Retro-Commissioning Sensor Suitcase Fact Sheet

  1. Ex parte communication of the California Energy Commission- Docket...

    Energy Savers [EERE]

    Ex parte communication of the California Energy Commission- Docket No. EERE-2008-BT-STD-0005 Ex parte communication of the California Energy Commission- Docket No. ...

  2. COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST FOR INFORMATION REGARDING SMART GRID POLICY COMMENTS OF THE MICHIGAN PUBLIC SERVICE COMMISSION STAFF TO REQUEST ...

  3. Arkansas Oil and Gas Commission | Open Energy Information

    Open Energy Info (EERE)

    Oil and Gas Commission Jump to: navigation, search Name: Arkansas Oil and Gas Commission Address: 301 Natural Resources Dr. Ste 102 Place: Arkansas Zip: 72205 Website:...

  4. Commission to Review the Effectiveness of the National Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commission to Review the Effectiveness of the National Energy Laboratories, Phase II Meeting Schedule Commission to Review the Effectiveness of the National Energy Laboratories, ...

  5. Chapter 9: Commissioning the Building | Department of Energy

    Energy Savers [EERE]

    Chapter 9 of the LANL Sustainable Design Guide contains information on commissioning process overview and commissioning activities and documentation for the project. sustainablegu...

  6. Kansas Corporation Commission Energy Division | Open Energy Informatio...

    Open Energy Info (EERE)

    Commission Energy Division Jump to: navigation, search Name: Kansas Corporation Commission Energy Division Address: 1500 SW Arrowhead Road Place: Topeka, KS Zip: 66604-4074 Phone...

  7. Retro-Commissioning Sensor Suitcase Fact Sheet | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Retro-Commissioning Sensor Suitcase Fact Sheet Retro-Commissioning Sensor Suitcase Fact Sheet Pacific Northwest National Laboratory (PNNL) and Lawrence Berkeley National Laboratory ...

  8. Philippines-Support for the National Climate Commission | Open...

    Open Energy Info (EERE)

    Philippines-Support for the National Climate Commission Jump to: navigation, search Name GIZ-Philippines-Support for the National Climate Commission AgencyCompany Organization...

  9. Philippines-Support for the National Climate Commission | Open...

    Open Energy Info (EERE)

    Philippines-Support for the National Climate Commission (Redirected from GIZ-Philippines-Support for the National Climate Commission) Jump to: navigation, search Name...

  10. Energy Praises the Nuclear Regulatory Commission Approval of...

    Office of Environmental Management (EM)

    Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the ...

  11. Department of Energy and Nuclear Regulatory Commission Increase...

    Office of Environmental Management (EM)

    Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership Department of Energy and Nuclear Regulatory Commission Increase Cooperation to ...

  12. Department of Energy Commends the Nuclear Regulatory Commission...

    Office of Environmental Management (EM)

    Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month Department of Energy Commends the Nuclear Regulatory Commission's Approval of a ...

  13. File:07FDBPlantCommissioning.pdf | Open Energy Information

    Open Energy Info (EERE)

    FDBPlantCommissioning.pdf Jump to: navigation, search File File history File usage Metadata File:07FDBPlantCommissioning.pdf Size of this preview: 463 599 pixels. Other...

  14. File:07CAAPlantCommissioningProcessApplicationForCertification...

    Open Energy Info (EERE)

    7CAAPlantCommissioningProcessApplicationForCertification.pdf Jump to: navigation, search File File history File usage Metadata File:07CAAPlantCommissioningProcessApplicationForCert...

  15. File:07ORDExpeditedPlantCommissioningProcess.pdf | Open Energy...

    Open Energy Info (EERE)

    ORDExpeditedPlantCommissioningProcess.pdf Jump to: navigation, search File File history File usage Metadata File:07ORDExpeditedPlantCommissioningProcess.pdf Size of this preview:...

  16. New Mexico Public Regulation Commission | Open Energy Information

    Open Energy Info (EERE)

    Public Regulation Commission Name: New Mexico Public Regulation Commission Address: 33 Plaza La Prensa Place: Santa Fe, New Mexico Zip: 87507 Website: www.nmprc.state.nm.us...

  17. Oklahoma Corporate Commission Oil and Gas | Open Energy Information

    Open Energy Info (EERE)

    Corporate Commission Oil and Gas Jump to: navigation, search Name: Oklahoma Corporate Commission Oil and Gas Place: Oklahoma Zip: 73152-2000 Website: www.occeweb.comogoghome.htm...

  18. Wyoming Oil and Gas Conservation Commission | Open Energy Information

    Open Energy Info (EERE)

    Oil and Gas Conservation Commission Jump to: navigation, search Name: Wyoming Oil and Gas Conservation Commission Address: 2211 King Blvd Place: Wyoming Zip: 82602 Website:...

  19. Retro-Commissioning Increases Data Center Efficiency at Low Cost...

    Energy Savers [EERE]

    Retro-Commissioning Increases Data Center Efficiency at Low Cost Retro-Commissioning Increases Data Center Efficiency at Low Cost Fact sheet discusses a success story detailing a ...

  20. Retro-Commissioning for State and Local Governments

    SciTech Connect (OSTI)

    Existing Commercial Buildings Working Group

    2012-05-23

    Describes how state and local governments can lead by example by retro-commissioning their own buildings and adopting retro-commissioning policies for the private sector.

  1. Dental Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Dental Plan Dental Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office...

  2. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Print ALS Strategic Plan Update: September 2015 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed...

  3. SU-E-T-438: Commissioning of An In-Vivo Quality Assurance Method Using the Electronic Portal Imaging Device

    SciTech Connect (OSTI)

    Morin, O; Held, M; Pouliot, J

    2014-06-01

    Purpose: Patient specific pre-treatment quality assurance (QA) using arrays of detectors or film have been the standard approach to assure the correct treatment is delivered to the patient. This QA approach is expensive, labor intensive and does not guarantee or document that all remaining fractions were treated properly. The purpose of this abstract is to commission and evaluate the performance of a commercially available in-vivo QA software using the electronic portal imaging device (EPID) to record the daily treatments. Methods: The platform EPIgray V2.0.2 (Dosisoft), which machine model compares ratios of TMR with EPID signal to predict dose was commissioned for an Artiste (Siemens Oncology Care Systems) and a Truebeam (Varian medical systems) linear accelerator following the given instructions. The systems were then tested on three different phantoms (homogeneous stack of solid water, anthropomorphic head and pelvis) and on a library of patient cases. Simple and complex fields were delivered at different exposures and for different gantry angles. The effects of the table attenuation and the EPID sagging were evaluated. Gamma analysis of the measured dose was compared to the predicted dose for complex clinical IMRT cases. Results: Commissioning of the EPIgray system for two photon energies took 8 hours. The difference between the dose planned and the dose measured with EPIgray was better than 3% for all phantom scenarios tested. Preliminary results on patients demonstrate an accuracy of 5% is achievable in high dose regions for both 3DCRT and IMRT. Large discrepancies (>5%) were observed due to metallic structures or air cavities and in low dose areas. Flat panel sagging was visible and accounted for in the EPIgray model. Conclusion: The accuracy achieved by EPIgray is sufficient to document the safe delivery of complex IMRT treatments. Future work will evaluate EPIgray for VMAT and high dose rate deliveries. This work is supported by Dosisoft, Cachan, France.

  4. Commissioning of the Ground Test Accelerator RFQ

    SciTech Connect (OSTI)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-09-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations.

  5. Commissioning of the Ground Test Accelerator RFQ

    SciTech Connect (OSTI)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations.

  6. SEP Program Planning Template ("Program Planning Template") ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEP Program Planning Template ("Program Planning Template") SEP Program Planning Template ("Program Planning Template") Program Planning Template More Documents & Publications...

  7. Texas Historical Commission | Open Energy Information

    Open Energy Info (EERE)

    history, economic development, heritage tourism, public administration, and urban planning." References "Website" Retrieved from "http:en.openei.orgw...

  8. Transmission Planning Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2015-06-23

    Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identifymore » weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysis and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.« less

  9. Transmission Planning Analysis Tool

    SciTech Connect (OSTI)

    2015-06-23

    Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identify weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysis and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.

  10. Nuclear Regulatory Commission | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Nuclear Regulatory Commission NNSA Receives Excellence Award for Radiological Security Enhancements in Hawaii HONOLULU - At an official event this week, the City and County of Honolulu presented the Department of Energy's (DOE) National Nuclear Security Administration (NNSA) with the Homeland Security Excellence Award for DOE/NNSA's Office of Radiological Security's (ORS) efforts

  11. US Nuclear Regulatory Commission functional organization charts, March 15, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  12. U. S. Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1989-07-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions and branches are presented.

  13. U. S. Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1982-02-01

    Functional organization charts for the NRC Commission Offices, Divisions, Staffs and Branches are presented.

  14. Potential Benefits of Commissioning California Homes

    SciTech Connect (OSTI)

    Matson, Nance; Wray, Craig; Walker, Iain; Sherman, Max

    2002-01-01

    Commissioning California's houses can result in better performing systems and houses. In turn, this will result in more efficient use of energy, carbon emission reductions, and improved occupant comfort. In particular, commissioning houses can save a significant amount of HVAC-related energy (15 to 30% in existing houses, 10 to 20% in new conventional houses, and up to 8% in advanced energy efficiency houses). The process that we considered includes corrective measures that could be implemented together during construction or during a single site visit (e.g., air tightening, duct sealing, and refrigerant and air handler airflow corrections in a new or existing house). Taking advantage of additional, more complex opportunities (e.g., installing new windows in an existing house, replacing the heating and air conditioning system in a new or existing house) can result in additional HVAC-related energy savings (60 to 75% in existing houses, and 50 to 60% in new conventional houses). The commissioning-related system and house performance improvements and energy savings translate to additional benefits throughout California and beyond. By applying commissioning principles to their work, the building community (builders and contractors) benefit from reduced callbacks and lower warranty costs. HERS raters and inspectors will have access to an expanded market sector. As the commissioning process rectifies construction defects and code problems, building code officials benefit from better compliance with codes. The utilities benefit from reduced peak demand, which can translate into lower energy acquisition costs. As houses perform closer to expectations, governmental bodies (e.g., the California Energy Commission and the Air Resources Board) benefit from greater assurance that actual energy consumption and carbon emissions are closer to the levels mandated in codes and standards, resulting in better achievement of state energy conservation and environmental goals. California

  15. A reload and startup plan for conversion of the NIST research...

    Office of Scientific and Technical Information (OSTI)

    Visit OSTI to utilize additional information resources in energy science and ... test plan must be submitted to the U.S. Nuclear Regulatory Commission (NRC) for their approval. ...

  16. Gore-Mbeki Binational Commission integrated housing program. Final report

    SciTech Connect (OSTI)

    1998-12-31

    This report documents the work done under Grant DE-FG36-97GO10209, Innovative Renewable Energy Technology Transfer Program. PEER Consultants, PC, and its subcontractor, PEER Africa (Pty.) Ltd., received an $88,000.00 grant to plan and build two energy efficient homes in the black township of Gugulethu in Cape Town, South Africa. These demonstration homes were given to the people of South Africa as a gesture of goodwill by the US government as part of the Gore-Mbeki Binational Commission (BNC) agreements and cooperation. The BNC is the term used to describe the agreement to work together by the US and the South African governments for economic development of South Africa in the areas of energy, commerce, agriculture, housing, and transportation. The BNC was formed in 1995. This project under the auspices of the BNC started in September 1996. The DOE-funded portion was performed between January 11, 1997 and February 28, 1997.

  17. FINAL REPORT-COMMISSION TO REVIEW THE EFFECTIVENESS OF THE NATIONAL ENERGY LABORATORIES

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Commission convened its final meeting in a public teleconference on October 23, 2015. At this meeting, the Commission outlined comments received on its final report during the written public comment period, heard additional comments from the public, and voted unanimously to approve the report. The Final Report (Volumes 1 and 2) is available for download below. Section 319 of the Consolidated Appropriations Act, 2014 (Public Law No. 113-76) directed the Secretary of Energy to establish the Commission to Review the Effectiveness of the National Energy Laboratories. The Commission was charged with reviewing the 17 Department of Energy (DOE) National Laboratories. It was established in May 2014 and held monthly meetings from July 2014 to July 2015. Congress directed the Commission to evaluate the laboratories in terms of their alignment with the Department’s strategic priorities, duplication, ability to meet current and future energy and national security challenges, size, and support of other Federal agencies. The Commission was also to review the efficiency and effectiveness of the laboratories, including assessing overhead costs and the impact of DOE’s oversight and management approach. Lastly, Congress had several specific questions related to the use of laboratory directed research and development (LDRD) such as the effectiveness of the Department’s oversight approach and the extent to which LDRD funding supports recruiting and retention of qualified staff. The Commission separated its charge into two phases. Phase 1 focused on the mission and strategic planning of the laboratories and Phase 2 targets the operation and oversight of the laboratory system. LDRD as it relates to the issues outlined above was considered in both phases of the Commission’s task. The Commission issued an Interim Report in February 2015 with its preliminary observations and recommendations.

  18. The role of regional transmission associations in providing open transmission access and services

    SciTech Connect (OSTI)

    Bahl, P.K.

    1996-05-01

    The Federal Energy Regulatory Commission (FERC) expanded its authority under the Energy Policy Act of 1992 and issued a Policy Statement on July 30, 1993, for the formation of Regional Transmission Groups (RTGs). In this Policy Statement, FERC laid out a minimum of seven components of RTG Governing Agreements. The purpose of the policy is for an RTG to become an effective instrument in enhancing competition in generation markets, and providing transmission access to requesting entities. The key components of the RTGs are: Coordinated Transmission Planning, Access Rules, Pricing Principles, Dispute Resolution, and adequate consultation and coordination with state regulatory commissions and other stakeholders. Though it is the responsibility of each regulated utility to obtain approval on transmission projects from its respective state commission and siting authority, the RTGs would create a mechanism to keep all commissions and other stakeholders informed on the development and finalization of new transmission projects. This would be done by providing copies of planning studies performed in the technical and economical evaluation of these projects.

  19. November 4, 2014 LAB COMMISSION MEETING MINUTES | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    November 4, 2014 LAB COMMISSION MEETING MINUTES November 4, 2014 LAB COMMISSION MEETING MINUTES The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its fourth meeting at 9:00 AM on November 4, 2014. The meeting included three panels: directors of ANL and FermiLab, industry partners, and university partners. Each panel consisted of testimony from the panelists followed by discussion with the commission. The lab directors gave an overview of

  20. April 22, 2015 Lab Commission Meeting Minutes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 22, 2015 Lab Commission Meeting Minutes April 22, 2015 Lab Commission Meeting Minutes The Commission to Review the Effectiveness of the National Energy Laboratories (Commission) was convened for its eighth meeting at 9:45 AM on April 22, 2015. Commission Co-Chair Jared Cohon led the meeting, which included discussion on cost savings through the Y-12/Pantex consolidation; budget atomization; and both NLDC and DOE perspectives on budget, accounting, and cost-saving initiatives. The

  1. Medical Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Medical Plans Medical Plans A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Medical Plans The Lab offers employees the choice between two medical plans through Blue Cross Blue Shield of New Mexico (BCBS). Both medical plans offer free preventive care and in and out of network coverage from the same network of BCBS providers. High Deductible Health Plan (HDHP) - A more

  2. Curriculum for Commissioning Energy Efficient Buildings

    SciTech Connect (OSTI)

    Webster, Lia

    2012-09-30

    In July 2010, the U.S. Department of Energy (DOE) awarded funding to PECI to develop training curriculum in commercial energy auditing and building commissioning. This program was created in response to the high demand for auditing and commissioning services in the U.S. commercial buildings market and to bridge gaps and barriers in existing training programs. Obstacles addressed included: lack of focus on entry level candidates; prohibitive cost and time required for training; lack of hands-on training; trainings that focus on certifications & process overviews; and lack of comprehensive training. PECI organized several other industry players to create a co-funded project sponsored by DOE, PECI, New York State Energy and Research Development Authority (NYSERDA), California Energy Commission (CEC), Northwest Energy Efficiency Alliance (NEEA) and California Commissioning Collaborative (CCC). After awarded, PECI teamed with another DOE awardee, New Jersey Institute of Technology (NJIT), to work collaboratively to create one comprehensive program featuring two training tracks. NJIT’s Center for Building Knowledge is a research and training institute affiliated with the College of Architecture and Design, and provided e-learning and video enhancements. This project designed and developed two training programs with a comprehensive, energy-focused curriculum to prepare new entrants to become energy auditors or commissioning authorities (CxAs). The following are the key elements of the developed trainings, which is depicted graphically in Figure 1: • Online classes are self-paced, and can be completed anywhere, any time • Commissioning Authority track includes 3 online modules made up of 24 courses delivered in 104 individual lessons, followed by a 40 hour hands-on lab. Total time required is between 75 and 100 hours, depending on the pace of the independent learner. • Energy Auditor track includes 3 online modules made up of 18 courses delivered in 72 individual

  3. Blue Ribbon Commission (BRC) Activities - SRSCRO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In 2009, the Obama administration canceled plans to build a permanent underground nuclear storage facility at Yucca Mountain in Nevada. The Department of Energy formed the ...

  4. Ethylene plant commissioned at Corpus Christi

    SciTech Connect (OSTI)

    Not Available

    1984-01-01

    Ethylene Plant Commissioned at Corpus Christi. Corpus Christi Petrochemical Co. has commissioned its $600 million ethylene plant at Corpus Christi, Tex. Plant capacities include 1.2 billion lb/yr of ethylene, 560 million lb/yr of propylene, 400 million lb/yr of crude butadiene mixture, 60 million gal of benzene, 45 million gal of gasoline blending components, and 50 million gal of fuel oils. The ethylene and propylene will be transported by pipeline to Houston for further processing. At the Corpus Christi facilities, process pressures range from full vacuum to 1800 psig, and process temperatures range from -260/sup 0/ to +1600/sup 0/F. The plant uses gas oil and naphtha as feedstock, but also has some flexibility to use ethane or LPG as feedstock. Stone and Webster Engineering Corp. engineered and Brown and Root Inc. built the plant.

  5. Commissioning of the PRIOR proton microscope

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Varentsov, D.; Antonov, O.; Bakhmutova, A.; Barnes, C. W.; Bogdanov, A.; Danly, C. R.; Efimov, S.; Endres, M.; Fertman, A.; Golubev, A. A.; et al

    2016-02-18

    Recently, a new high energy proton microscopy facility PRIOR (Proton Microscope for FAIR Facility for Anti-proton and Ion Research) has been designed, constructed, and successfully commissioned at GSI Helmholtzzentrum für Schwerionenforschung (Darmstadt, Germany). As a result of the experiments with 3.5–4.5 GeV proton beams delivered by the heavy ion synchrotron SIS-18 of GSI, 30 μm spatial and 10 ns temporal resolutions of the proton microscope have been demonstrated. A new pulsed power setup for studying properties of matter under extremes has been developed for the dynamic commissioning of the PRIOR facility. This study describes the PRIOR setup as well asmore » the results of the first static and dynamic protonradiography experiments performed at GSI.« less

  6. Nuclear Regulatory Commission Information Digest, 1991 edition

    SciTech Connect (OSTI)

    Olive, K L

    1991-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs.

  7. Sandia Contributes to International Electrotechnical Commission IEC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    61400-26 Availability Standard Contributes to International Electrotechnical Commission IEC 61400-26 Availability Standard - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power &

  8. COMMISSIONING OF THE RELATIVISTIC HEAVY ION COLLIDER.

    SciTech Connect (OSTI)

    TRBOJEVIC,D.; AHRENS,L.; BLASKIEWICZ,M.; BRENNAN,M.; BAI,M.; CAMERON,P.; CARDONA,J.; CONNOLLY,R.; ET AL; TSOUPAS,N.; VAN ZEIJTS,J.

    2001-06-18

    This report describes in detail steps performed in bringing the Relativistic Heavy Ion Collider (RHIC) from the commissioning into the operational stage when collisions between 60 bunches of fully striped gold ions, were routinely provided. Corrections of the few power supplies connections by the beam measurements are described. Beam lifetime improvements at injection, along the acceleration are shown. The beam diagnostic results; like Schottky detector, beam profile monitor, beam position monitors, tune meter and others, are shown [1].

  9. Notices Safety Commission, 4330 East West

    National Nuclear Security Administration (NNSA)

    20 Federal Register / Vol. 77, No. 8 / Thursday, January 12, 2012 / Notices Safety Commission, 4330 East West Highway, Bethesda, MD 20814, (301) 504-7923. Dated: January 10, 2012. Todd A Stevenson, Secretary. [FR Doc. 2012-625 Filed 1-10-12; 4:15 pm] BILLING CODE 6355-01-P CORPORATION FOR NATIONAL AND COMMUNITY SERVICE Information Collection; Submission for OMB Review, Comment Request AGENCY: Corporation for National and Community Service. ACTION: Notice. SUMMARY: The Corporation for National

  10. Commissioning an Engineering Scale Coal Gasifier

    SciTech Connect (OSTI)

    Reid, Douglas J.; Bearden, Mark D.; Cabe, James E.

    2010-07-01

    This report explains the development, commissioning, and testing of an engineering scale slagging coal gasifier at PNNL. The initial objective of this project was to commission the gasifier with zero safety incidents. The commissioning work was primarily an empirical study that required an engineering design approach. After bringing the gasifier on-line, tests were conducted to assess the impact of various operating parameters on the synthesis gas (syngas) product composition. The long-term intent of this project is to produce syngas product for use by internal Pacific Northwest National Laboratory (PNNL) researchers in catalyst, materials, and instrumentation development. Future work on the project will focus on improving the reliability and performance of the gasifier, with a goal of continuous operation for greater than 4 hours using coal feedstock. In addition, alternate designs that allow for increased flexibility regarding the fuel sources that can be used for syngas production is desired. Continued modifications to the fuel feed system will be pursued to address these goals. Alternative feed mechanisms such as a coal/methanol slurry are being considered.

  11. US Nuclear Regulatory Commission functional organization charts

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    This document provides functional organization charts for all NRC Offices and Regions, and their components.

  12. Practical Diagnostics for Evaluating Residential Commissioning Metrics

    SciTech Connect (OSTI)

    Wray, Craig; Walker, Iain; Siegel, Jeff; Sherman, Max

    2002-06-11

    In this report, we identify and describe 24 practical diagnostics that are ready now to evaluate residential commissioning metrics, and that we expect to include in the commissioning guide. Our discussion in the main body of this report is limited to existing diagnostics in areas of particular concern with significant interactions: envelope and HVAC systems. These areas include insulation quality, windows, airtightness, envelope moisture, fan and duct system airflows, duct leakage, cooling equipment charge, and combustion appliance backdrafting with spillage. Appendix C describes the 83 other diagnostics that we have examined in the course of this project, but that are not ready or are inappropriate for residential commissioning. Combined with Appendix B, Table 1 in the main body of the report summarizes the advantages and disadvantages of all 107 diagnostics. We first describe what residential commissioning is, its characteristic elements, and how one might structure its process. Our intent in this discussion is to formulate and clarify these issues, but is largely preliminary because such a practice does not yet exist. Subsequent sections of the report describe metrics one can use in residential commissioning, along with the consolidated set of 24 practical diagnostics that the building industry can use now to evaluate them. Where possible, we also discuss the accuracy and usability of diagnostics, based on recent laboratory work and field studies by LBNL staff and others in more than 100 houses. These studies concentrate on evaluating diagnostics in the following four areas: the DeltaQ duct leakage test, air-handler airflow tests, supply and return grille airflow tests, and refrigerant charge tests. Appendix A describes those efforts in detail. In addition, where possible, we identify the costs to purchase diagnostic equipment and the amount of time required to conduct the diagnostics. Table 1 summarizes these data. Individual equipment costs for the 24

  13. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Strategic Plan Print ALS Strategic Plan Update: September 2015 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed projects, new scientific directions, and changing priorities. This most recent revision, Advanced Light Source Strategic Plan: 2015-19 (1.2 MB), was completed in September 2015. The plan encompasses the needs of the scientific community as well as our responses to meeting those needs through development of our

  14. Vision Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vision Plan Vision Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Vision Plan The Lab offers employees and their eligible dependents free vision coverage through Vision Service Plan (VSP). The plan covers exams, contact lenses, eyeglass lenses and frames. Participants can use any provider but VSP network providers offer the best value and will file the claim

  15. Dose discrepancies in the buildup region and their impact on dose calculations for IMRT fields

    SciTech Connect (OSTI)

    Hsu, Shu-Hui; Moran, Jean M.; Chen Yu; Kulasekere, Ravi; Roberson, Peter L.

    2010-05-15

    Purpose: Dose accuracy in the buildup region for radiotherapy treatment planning suffers from challenges in both measurement and calculation. This study investigates the dosimetry in the buildup region at normal and oblique incidences for open and IMRT fields and assesses the quality of the treatment planning calculations. Methods: This study was divided into three parts. First, percent depth doses and profiles (for 5x5, 10x10, 20x20, and 30x30 cm{sup 2} field sizes at 0 deg., 45 deg., and 70 deg. incidences) were measured in the buildup region in Solid Water using an Attix parallel plate chamber and Kodak XV film, respectively. Second, the parameters in the empirical contamination (EC) term of the convolution/superposition (CVSP) calculation algorithm were fitted based on open field measurements. Finally, seven segmental head-and-neck IMRT fields were measured on a flat phantom geometry and compared to calculations using {gamma} and dose-gradient compensation (C) indices to evaluate the impact of residual discrepancies and to assess the adequacy of the contamination term for IMRT fields. Results: Local deviations between measurements and calculations for open fields were within 1% and 4% in the buildup region for normal and oblique incidences, respectively. The C index with 5%/1 mm criteria for IMRT fields ranged from 89% to 99% and from 96% to 98% at 2 mm and 10 cm depths, respectively. The quality of agreement in the buildup region for open and IMRT fields is comparable to that in nonbuildup regions. Conclusions: The added EC term in CVSP was determined to be adequate for both open and IMRT fields. Due to the dependence of calculation accuracy on (1) EC modeling, (2) internal convolution and density grid sizes, (3) implementation details in the algorithm, and (4) the accuracy of measurements used for treatment planning system commissioning, the authors recommend an evaluation of the accuracy of near-surface dose calculations as a part of treatment planning

  16. Partnership Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Partnership Plan July 2016 July 2016 Page 1 U.S. DRIVE Partnership Plan Table of Contents Foreword ....................................................................................................................................................... 2 Definition ...................................................................................................................................................... 3 Partners

  17. Topic A Awardee: Eastern Interconnection Planning Collaborative |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Eastern Interconnection Planning Collaborative Topic A Awardee: Eastern Interconnection Planning Collaborative Eastern Interconnection Planning Collaborative The Eastern Interconnection Planning Collaborative (EIPC) was initiated by a coalition of regional Planning Authorities. These Planning Authorities are entities listed on the NERC compliance registry as Planning Authorities and represent the entire Eastern Interconnection. The EIPC was founded to be a broad-based,

  18. Investigation of the persistence of new building commissioning

    SciTech Connect (OSTI)

    Potter, Amanda; Friedman, Hannah; Haasl, Tudi; Claridge, David

    2002-03-17

    Commissioning is gaining increasing recognition as a cost-effective strategy for reducing commercial building energy use. Although the success and cost-effectiveness of commissioning projects depends on how well the benefits of commissioning persist over time, this aspect of commissioning is not well understood. The persistence of commissioning benefits was recently studied in a PIER project evaluating ten buildings that were commissioned at building start-up at least two years ago. The researchers examined the commissioning reports, control algorithms, EMCS point measurements, and energy use data, and conducted operator and commissioning provider interviews to investigate the persistence of commissioning benefits. In addition, they conducted site visits in a sample of the buildings. A set of commissioning measures was selected for each building to compare the persistence of benefits. Persistence was measured both qualitatively through a discussion of occupant comfort and decreased maintenance and quantitatively through estimations of energy savings. This paper reports the results of the study. The discussion includes how well the benefits of commissioning persisted over time, reasons for declining performance, and methods for improving persistence. The results provide valuable insight into how to estimate the persistence of commissioning information central to the cost benefit analyses routinely performed for commissioning measures.

  19. Technical planning activity: Final report

    SciTech Connect (OSTI)

    Not Available

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  20. Clean Energy Business Plan Competition

    ScienceCinema (OSTI)

    Maxted, Sara Jane; Lojewski, Brandon; Scherson, Yaniv;

    2013-05-29

    Top Students Pitch Clean Energy Business Plans The six regional finalists of the National Clean Energy Business Plan Competition pitched their business plans to a panel of judges June 13 in Washington, D.C. The expert judges announced NuMat Technologies from Northwestern University as the grand prize winner.

  1. Clean Energy Business Plan Competition

    SciTech Connect (OSTI)

    Maxted, Sara Jane; Lojewski, Brandon; Scherson, Yaniv

    2012-01-01

    Top Students Pitch Clean Energy Business Plans The six regional finalists of the National Clean Energy Business Plan Competition pitched their business plans to a panel of judges June 13 in Washington, D.C. The expert judges announced NuMat Technologies from Northwestern University as the grand prize winner.

  2. The role of EPA`s Acid Rain Division in the Ozone Transport Commission`s NOx budget program

    SciTech Connect (OSTI)

    Schary, C.; Culligan, K.

    1997-12-31

    The Ozone Transport Commission`s (OTC) Nitrogen Oxides (NO{sub x}) Budget Program will implement the emissions reduction goal of the 1994 Memorandum of Understanding between its twelve member states and the District of Columbia. The program will achieve its significant NO{sub x} reductions from electric utilities and industrial boilers using a {open_quotes}cap-and-trade{close_quotes} approach modeled after the US Environmental Protection Agency`s sulfur dioxide emissions trading under the Acid Rain Program. The similarity of the two programs has led to the development of an important partnership between the OTC states and EPA`s Acid Rain Division, Over the past two years, Acid Rain Program staff have shared their technical expertise and assisted extensively in the development of the program`s rules. Leveraging the investment EPA made in the systems used to run the Acid Rain Program, the OTC states have asked the Acid Rain Division to administer the data systems for them, and together are working to expand its existing Emissions Tracking System and to modify a clone of the sulfur dioxide Allowance Tracking System, to fulfill the unique requirements of the NO{sub x} Budget Program. This partnership is an important example of the new type of cooperation and sharing of expertise and resources that should develop between EPA and states as they launch multi-state programs to address regional pollution problems that defy a single-state solution.

  3. The International Heat Flow Commission | Open Energy Information

    Open Energy Info (EERE)

    International Heat Flow Commission Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: The International Heat Flow Commission Authors A. E. Beck and...

  4. Ex Parte Meeting between DOE and California Energy Commission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    between DOE and California Energy Commission Docket No EERE2008BTSTD0005 RIN 1904AB57 Ex Parte Meeting between DOE and California Energy Commission Docket No EERE2008BTSTD0005 RIN ...

  5. Installation and commissioning of the new Fermi National Accelerator Laboratory H- Magnetron

    SciTech Connect (OSTI)

    Bollinger, D. S.

    2014-02-15

    The Fermi National Accelerator Laboratory (FNAL) 40 year old Cockcroft-Walton 750 keV injectors with slit aperture magnetron ion sources have been replaced with a circular aperture magnetron, Low Energy Beam Transport, Radio Frequency Quadrupole Accelerator, and Medium Energy Beam Transport, as part of the FNAL Proton Improvement Plan. The injector design is based on a similar system at Brookhaven National Laboratory. The installation, commissioning efforts, and source operations to date will be covered in this paper along with plans for additional changes to the original design to improve reliability by reducing extractor spark rates and arc current duty factor.

  6. Opening Remarks, California Energy Commission Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    M I S S I O N Hydrogen Energy Storage For Grid and Transportation Services Fernando Pina, Manager Energy Research and Development Division Jim McKinney, Manager Fuels and Transportation Division California Energy Commission May 14, 2014 1 C A L I F O R N I A E N E R G Y C O M M I S S I O N * Introduction * Energy Policy * Energy Storage - Challenges and Opportunities * Alternative and Renewable Fuel and Vehicle Technology Investment in Hydrogen Fueling Stations & EPIC Program * Questions

  7. Commissioning of the ATLAS pixel detector

    SciTech Connect (OSTI)

    ATLAS Collaboration; Golling, Tobias

    2008-09-01

    The ATLAS pixel detector is a high precision silicon tracking device located closest to the LHC interaction point. It belongs to the first generation of its kind in a hadron collider experiment. It will provide crucial pattern recognition information and will largely determine the ability of ATLAS to precisely track particle trajectories and find secondary vertices. It was the last detector to be installed in ATLAS in June 2007, has been fully connected and tested in-situ during spring and summer 2008, and is ready for the imminent LHC turn-on. The highlights of the past and future commissioning activities of the ATLAS pixel system are presented.

  8. Atomic Energy Commission : Atomic Power at Shippingport - 1958 Educational Film

    SciTech Connect (OSTI)

    2013-02-02

    The United States Atomic Energy Commission & Westinghouse Electric Company take us on a tour of an atomic power station.

  9. Response of the District of Columbia Public Service Commission | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy of the District of Columbia Public Service Commission Response of the District of Columbia Public Service Commission Docket No. EO-05-01: Response of the District of Columbia Public Service Commission ("DCPSC") to submissions made in this proceeding by Robert G. Burnley, Director of the Commonwealth of Virginia Department of Environmental Quality and the City of Alexandria. Response of the District of Columbia Public Service Commission (7.17 MB) More Documents &

  10. US Nuclear Regulatory Commission functional organization charts, January 31, 1992

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  11. Nuclear Regulatory Commission issuances, October 1993. Volume 38, No. 4

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners` motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners` have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission`s Memorandum and Order are included.

  12. Atomic Energy Commission : Atomic Power at Shippingport - 1958 Educational Film

    ScienceCinema (OSTI)

    None

    2014-07-31

    The United States Atomic Energy Commission & Westinghouse Electric Company take us on a tour of an atomic power station.

  13. A History of the Atomic Energy Commission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Atomic Energy Commission A History of the Atomic Energy Commission A History of the Atomic Energy Commission - written by Alice L. Buck Washington, D.C.: U.S. Department of Energy, July 1983. 41 pp. AEC History.pdf (1.01 MB) More Documents & Publications The History of Nuclear Energy The Manhattan Project Hewlett and Holl - Atoms for Peace and War

  14. Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work Plan NSSAB Members Vote on Work Plan Tasks; The Nevada Site Specific Advisory Board operates on a fiscal year basis and conducts work according to a NSSAB generated and U.S. Department of Energy (DOE) approved work plan. FY 2016 Work Plan Work plan items focus on providing recommendations to the DOE regarding the following subjects: soil contamination from historic atmospheric nuclear testing, remediation of contaminated facilities used to support historic testing, groundwater studies

  15. Legal Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Legal Plan Legal Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Legal Plan Most people need legal advice at one time or another but high legal fees may prevent you from getting the necessary assistance. For a small monthly premium, employees can enroll in legal coverage through ARAG. The plan provides assistance with routine preventive or defensive matters and

  16. MINER{nu}A Test Beam Commissioning

    SciTech Connect (OSTI)

    Higuera, A.; Castorena, J.; Urrutia, Z.; Felix, J.; Zavala, G.

    2009-12-17

    MINER{nu}A Main INjector ExpeRiment {nu}-A is a high-statistic neutrino scattering experiment that will ran in the NuMI Beam Hall at Fermilab. To calibrate the energy response of the MINER{nu}A detector, a beamline is being designed for the MINER{nu}A Test Beam Detector (TBD). The TBD is a replica of the full MINER{nu}A detector at small scale for calibration studies of the main detector. The beamline design consists of the following parts: a copper target, used to generate tertiaries from an incoming secondary beam; a steel collimator for tertiaries, which also serves as a dump for the incoming beam; a time of fight system (scintillator planes); four wire chambers, for angle measurements and tracking; and two dipole magnets, used as an spectrometer. During last October, the first commissioning run of the MINER{nu}A Test Beam took place in the Meson Test Beam Facility at Fermilab. We commissioned the target and collimator of the new tertiary beamline.

  17. CAPITAL REGION

    Broader source: Energy.gov (indexed) [DOE]

    In the past year the Commission had taken several actions to strengthen its cyber security program. In particular, it: * Strengthened password management and corrected prior year ...

  18. Transition Zone Geothermal Region | Open Energy Information

    Open Energy Info (EERE)

    Unknown Planned Capacity 1 Geothermal Areas within the Transition Zone Geothermal Region Energy Generation Facilities within the Transition Zone Geothermal Region Geothermal Power...

  19. Independent Verification and Validation Of SAPHIRE 8 Risk Management Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect (OSTI)

    Kent Norris

    2009-11-01

    This report provides an evaluation of the risk management. Risk management is intended to ensure a methodology for conducting risk management planning, identification, analysis, responses, and monitoring and control activities associated with the SAPHIRE project work, and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  20. Physics Division Work Planning Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements The following is Physics Division requirements related to work planning, control and authorization for work projects and test set ups in division work areas across the laboratory. For the testing and commissioning of experimental equipment the consequences/cost of said equipment should receive careful consideration when doing the risk analysis. * Any small setup or task with total duration of less than two weeks requires an informal task hazard analysis. Informal means we can do

  1. INITIAL COMMISSIONING OF NDCX-II

    SciTech Connect (OSTI)

    Lidia, S.; Arbelaez, D.; Greenway, W.; Jung, J. -Y.; Kwan, J.; Lipton, T.; Pekedis, A.; Roy, P.; Seidl, P.; Takakuwa, J.; Waldron, W.; Friedman, A.; Grote, D.; Sharp, W.; Gilson, E.

    2012-05-15

    The Neutralized Drift Compression Experiment-II (NDCX-II) will generate ion beam pulses for studies of Warm Dense Matter and heavy-ion-driven Inertial Fusion Energy. The machine will accelerate 20-50 nC of Li+ to 1.2-3 MeV energy, starting from a 10.9-cm alumino-silicate ion source. At the end of the accelerator the ions are focused to a sub-mm spot size onto a thin foil (planar) target. The pulse duration is compressed from ~;;500 ns at the source to sub-ns at the target following beam transport in a neutralizing plasma. We first describe the injector, accelerator, transport, final focus and diagnostic facilities. We then report on the results of early commissioning studies that characterize beam quality and beam transport, acceleration waveform shaping and beam current evolution. We present simulation results to benchmark against the experimental measurements.

  2. Rulison Monitoring Plan

    SciTech Connect (OSTI)

    2010-07-01

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile radionuclides

  3. Richmond Electric Vehicle Initiative Electric Vehicle Readiness Plan

    Broader source: Energy.gov [DOE]

    The REVi plan addresses the electric vehicle market in Richmond and then addresses a regional plan, policies, and analysis of the the communities readiness.

  4. NRS Chapter 278 Planning and Zoning | Open Energy Information

    Open Energy Info (EERE)

    governing rules related to citycounty and regional land use planning, including procedures for proposing amendments to land use plans. Published NA Year Signed or Took Effect...

  5. Building geothermal research and development partnerships: The California Energy Commission`s geothermal program

    SciTech Connect (OSTI)

    Hare, R.; Tiangco, V.; Birkinshaw, K.; Johannis, M.

    1995-12-31

    The California Energy Commission`s Geothermal Program (Assembly Bill 1905, Bosco) has built cost-shared Research, Development and Demonstration (RD&D) partnerships with over 150 public and private entities. The Geothermal Program promotes the development of new geothermal resources and technologies for both direct-use and electricity generation while protecting the environment and promoting energy independence. This is accomplished by providing financial and technical assistance in the form of contingent awards which, depending on project success, can become either a loan or a grant. Some of the cost-shared RD&D accomplishments are presented. The process and requirements to obtain financial assistance through the Geothermal Program are summarized.

  6. Navajo Hopi Land Commission Office (NHLCO): Navajo Hopi Land Commission Office (NHLCO)- 2012 Project

    Broader source: Energy.gov [DOE]

    The Navajo Hopi Land Commission (NHLCO), together with its partners, will conduct a feasibility study (FS) of a program to develop renewable energy on the Paragon-Bisti ranch lands in northwestern New Mexico, which were set aside under the Navajo-Hopi Land Settlement Act for the benefit of relocatees (defined as Navajo families living on Hopi Partitioned Lands as of December 22, 1974).

  7. EFCOG Best Practice Submission - Guidance for Retro-Commissioning

    SciTech Connect (OSTI)

    Ernest L. Fossum, CEM

    2006-01-01

    Commissioning is slowly becoming an accepted quality method for ensuring that buildings are designed, constructed, and operated as required by the building owner and as intended by the original design. Retro-commissioning is a process, using commissioning concepts, to ensure that existing buildings are operated and maintained as required by the owner to meet the building’s current mission. Retro-commissioning further seeks to incorporate new equipment and operating practices to upgrade existing facilities to obtain increased efficiency and employee comfort and productivity. Retro-commissioning practices are not universal. Best practices have been identified to assist Federal organizations with the development of retro-commissioning programs and to help DOE sites to begin this quality related process.

  8. Study the sensitivity of dose calculation in prism treatment planning system using Monte Carlo simulation of 6 MeV electron beam

    SciTech Connect (OSTI)

    Hardiansyah, D.; Haryanto, F.; Male, S.

    2014-09-30

    Prism is a non-commercial Radiotherapy Treatment Planning System (RTPS) develop by Ira J. Kalet from Washington University. Inhomogeneity factor is included in Prism TPS dose calculation. The aim of this study is to investigate the sensitivity of dose calculation on Prism using Monte Carlo simulation. Phase space source from head linear accelerator (LINAC) for Monte Carlo simulation is implemented. To achieve this aim, Prism dose calculation is compared with EGSnrc Monte Carlo simulation. Percentage depth dose (PDD) and R50 from both calculations are observed. BEAMnrc is simulated electron transport in LINAC head and produced phase space file. This file is used as DOSXYZnrc input to simulated electron transport in phantom. This study is started with commissioning process in water phantom. Commissioning process is adjusted Monte Carlo simulation with Prism RTPS. Commissioning result is used for study of inhomogeneity phantom. Physical parameters of inhomogeneity phantom that varied in this study are: density, location and thickness of tissue. Commissioning result is shown that optimum energy of Monte Carlo simulation for 6 MeV electron beam is 6.8 MeV. This commissioning is used R50 and PDD with Practical length (R{sub p}) as references. From inhomogeneity study, the average deviation for all case on interest region is below 5 %. Based on ICRU recommendations, Prism has good ability to calculate the radiation dose in inhomogeneity tissue.

  9. Nuclear Regulatory Commission Regulatory and Licensing Matters | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Regulatory Commission Regulatory and Licensing Matters Nuclear Regulatory Commission Regulatory and Licensing Matters GC-52 provides legal advice to DOE regarding Nuclear Regulatory Commission (NRC) regulatory and licensing matters of interest to DOE, either as an NRC license applicant or in connection with related authorities and responsibilities of DOE and NRC on nuclear material, nuclear waste, and nuclear nonproliferation matters. GC-52 attorneys provide advice and support on a

  10. Commission to Review the Effectiveness of the National Energy Laboratories,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Phase II Meeting Schedule | Department of Energy Commission to Review the Effectiveness of the National Energy Laboratories, Phase II Meeting Schedule Commission to Review the Effectiveness of the National Energy Laboratories, Phase II Meeting Schedule The Commission meets monthly to gather information that will inform its study. Public meetings allow for public participation. Individuals who would like to attend must RSVP to Karen Gibson, Designated Federal Officer (DFO), no later than two

  11. Commissioning of CHP Systems - White Paper, April 2008 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Commissioning of CHP Systems - White Paper, April 2008 Commissioning of CHP Systems - White Paper, April 2008 This 2008 white paper explores commissioning practices of Combined Heat and Power (CHP) systems applied within the built environment. CHP systems are more complex involving increased attention to atmospheric emissions and electric grid interconnection and sophisticated control logic. This paper details four example case studies. A San Francisco hotel was retrofitted with a

  12. NNSA and the European Commission advance global nuclear nonproliferation

    National Nuclear Security Administration (NNSA)

    goals at 6th annual Joint Steering Committee Meeting | National Nuclear Security Administration | (NNSA) and the European Commission advance global nuclear nonproliferation goals at 6th annual Joint Steering Committee Meeting Friday, July 15, 2016 - 11:13am NNSA and the European Commission's Joint Research Centre participants at the 6th Annual Joint Steering Committee meeting. NNSA and the European Commission (E.C.) recently met in Ispra, Italy, to review the status of collaborative efforts

  13. Blue Ribbon Commission on America's Nuclear Future Charter | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Blue Ribbon Commission on America's Nuclear Future Charter Blue Ribbon Commission on America's Nuclear Future Charter March 2, 2010 - 12:00am Addthis The Secretary of Energy, acting at the direction of the President, is establishing the Commission to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle, including all alternatives for the storage, processing, and disposal of civilian and defense used nuclear fuel, high-level waste, and

  14. Ex parte communication of the California Energy Commission- Docket No.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE-2008-BT-STD-0005 | Department of Energy Ex parte communication of the California Energy Commission- Docket No. EERE-2008-BT-STD-0005 Ex parte communication of the California Energy Commission- Docket No. EERE-2008-BT-STD-0005 On January 6, 2011, Mike Leaon, Harinder Singh, Ken Rider, and Dennis Beck of the California Energy Commission (CEC) had a telephone conversation with Victor Petrolati of DOE regarding the above referenced proceeding, concerning energy conservation standards for

  15. Kazakhstan - United States Special Commission on Energy Partnership |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Kazakhstan - United States Special Commission on Energy Partnership Kazakhstan - United States Special Commission on Energy Partnership April 6, 2016 - 5:12pm Addthis On April 6, 2016, the Kazakhstan - United States Energy Partnership Commission held a meeting at the Energy Ministry of the Republic of Kazakhstan, co-chaired by Energy Minister K.A. Bosumbayev and Secretary of Energy, Dr. Ernest Moniz. The Republic of Kazakhstan was represented at the session by officials

  16. Speakers: Howard K. Gruenspecht, EIA Shahid Chaudhry, California Energy Commission

    U.S. Energy Information Administration (EIA) Indexed Site

    10: "The Energy-Water Nexus: Availability and Impacts" Speakers: Howard K. Gruenspecht, EIA Shahid Chaudhry, California Energy Commission M. Michael Hightower, Sandia National Laboratories James Richenderfer, Susquehanna River Basin Commission Jeff C. Wright, Federal Energy Regulatory Commission [Note: Recorders did not pick up introduction of panel (see biographies for details on the panelists) or introduction of session.] Howard Gruenspecht: Okay, we're going to try to get underway

  17. Department of Energy and Nuclear Regulatory Commission Increase Cooperation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Advance Global Nuclear Energy Partnership | Department of Energy Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership Department of Energy and Nuclear Regulatory Commission Increase Cooperation to Advance Global Nuclear Energy Partnership July 17, 2007 - 2:55pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) and Nuclear Regulatory Commission (NRC) expanded cooperation for President Bush's Global Nuclear Energy Partnership (GNEP)

  18. Commissioning of horizontal-bend superconducting magnet for Jefferson Lab's 11-GeV super high momentum spectrometer

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Sun, Eric; Brindza, Paul D.; Lassiter, Steven R.; Fowler, Mike J.; Fenker, Howard C.; DeKamp, Jon C.

    2016-03-02

    Commissioning characteristics of the Superconducting High Momentum Spectrometer (SHMS) Horizontal Bend (HB) magnet was presented. Pre-commissioning peer review of the magnet uncovered issues with eddy currents in the thermal shield, resulting in additional testing and modeling of the magnet. A three-stage test plan was discussed. A solution of using a small dump resistor and a warm thermal shield was presented. Analyses illustrated that it was safe to run the magnet to full test current. As a result, the HB magnet was successfully cooled to 4 K and reached its maximum test current of 4000 A.

  19. Public Utility Commission in the year 2000

    SciTech Connect (OSTI)

    Jones, D.N.

    1995-12-31

    This article is about What is and What ought to be as we look to the institution of public utility commission regulation at the turn of the century. To signal my own view at the outset, I find the prospects somewhat worrisome in light of the nature and direction of much of the response to real and imaginary changes in the regulated sectors. I surely do not call for standing in place, but I strongly believe we should leave the place standing. The following items are discernable trends that will shape the PUC at the turn-of-the century: (1) dichotomy of customers into core and noncore groups, (2) unbundling and new service offerings with a menu of prices, (3) relaxed regulation and increased reliance on market solutions instead of command and control, (4) increased use of market-based pricing and incentive ratemaking, (5) large users seeking lowest-cost generation and supply services, (6) shift from old regulatory bargains regarding exclusive territorial franchises and assured recovery of costs and investments, (7) utility diversification, (8) increasing business risk for utilities, amd (9) uncertainty as to continued utility attention to social goals and a changing obligation to serve. For each of these, the author focuses on: (1) changing missions and roles of the PUC, (2) the strategies for achieving them, and (3) the implementation requirements that operationalize the strategies.

  20. AEgIS experiment commissioning at CERN

    SciTech Connect (OSTI)

    Krasnicky, D.; Aghion, S.; Amsler, C.; Ariga, A.; Ariga, T.; Ereditato, A.; Kawada, J.; Kimura, M.; Pistillo, C.; Scampoli, P.; Storey, J.; Belov, A. S.; Gninenko, S. N.; Bonomi, G.; Subieta Vasquez, M. A.; Braeunig, P.; Oberthaler, M. K.; Brusa, R. S.; Di Noto, L.; Mariazzi, S.; and others

    2013-03-19

    The AEgIS Experiment is an international collaboration based at CERN whose aim is to perform the first direct measurement of the gravitational acceleration g of antihydrogen in the gravitational field of the Earth. Cold antihydrogen will be produced with a pulsed charge exchange reaction in a cylindrical Penning trap where antiprotons will be cooled to 100mK. The cold antihydrogen will be produced in an excited Rydberg state and subsequently formed into a beam. The deflection of the antihydrogen beam will be measured by using Moire deflectometer gratings. After being approved in late 2008, AEgIS started taking data in a commissioning phase early 2012. This report presents an overview of the AEgIS experiment, describes its current status and shows the first measurements on antiproton catching and cooling in the 5 T Penning catching trap. We will also present details on the techniques needed for the 100mK antihydrogen production, such as pulsed positronium production and its excitation with lasers.

  1. Retro-Commissioning for Regulators of Ratepayer-Funded Programs

    SciTech Connect (OSTI)

    Existing Commercial Buildings Working Group

    2012-05-23

    Describes how customer usage data can help promote the adoption of retro-commissioning polices for public and private commercial buildings.

  2. Chapter 1 of the Wyoming Public Service Commission Regulations...

    Open Energy Info (EERE)

    of the Wyoming Public Service Commission Regulations: Rules of Practice and Procedure Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  3. Chapter 9 of the Wyoming Public Service Commission Regulations...

    Open Energy Info (EERE)

    9 of the Wyoming Public Service Commission Regulations: General Forms Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation:...

  4. Including Retro-Commissioning in Federal Energy Savings Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enabling Mass-Scale Financing for Federal Energy, Water, and Sustainability Projects Retro-Commissioning Increases Data Center Efficiency at Low Cost Energy Savings Performance ...

  5. UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE TENNESSEE THE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MDDC 869 UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE TENNESSEE THE DIFFRACTION OF NEUTRONS BY CRYSTALLINE POWDERS by E. 0. Wollan C. G. Shull Clinton Laboratories Published ...

  6. Richard Lazarus Named as Executive Director of National Commission...

    Energy Savers [EERE]

    the BP Deepwater Horizon Oil Spill and Offshore Drilling Richard Lazarus Named as Executive Director of National Commission on the BP Deepwater Horizon Oil Spill and Offshore ...

  7. Guidelines and Checklist for Commissioning and Government Acceptance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guidelines and Checklist for Commissioning and Government Acceptance of ESPC ENABLE ... More Documents & Publications Guidelines, Checklist, and Contract Clauses for Government ...

  8. Chapter 2 of the Wyoming Public Service Commission Regulations...

    Open Energy Info (EERE)

    2 of the Wyoming Public Service Commission Regulations: General Regulations Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation:...

  9. 2 CCR State Lands Commission Article 1, General Provisions |...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: 2 CCR State Lands Commission Article 1, General ProvisionsLegal Abstract California...

  10. EERE Demonstration for Advanced Retro-commissioning Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demonstration for Advanced Retro-commissioning Technology: Predictive Energy Optimization (PEO) and Automated Demand Response for Commercial Building HVAC 2016 Building ...

  11. EERE Demonstration for Advanced Retro-commissioning Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Demonstration for Advanced Retro-commissioning Technology: Predictive Energy Optimization (PEO) and Automated Demand Response for Commercial Building HVAC 2015 Building ...

  12. Atomic Energy Commission Explores Peaceful Uses of Nuclear Explosions...

    National Nuclear Security Administration (NNSA)

    Explosions Nevada Test Site, NV As part of the Plowshare program seeking to develop peaceful uses for nuclear explosives, the Atomic Energy Commission conducts the Sedan test ...

  13. Atomic Energy Commission Takes Over Responsibility for all Atomic...

    National Nuclear Security Administration (NNSA)

    Takes Over Responsibility for all Atomic Energy Programs Atomic Energy Commission Takes Over Responsibility for all Atomic Energy Program Washington, DC In accordance with the ...

  14. Orlando Utilities Commission- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Orlando Utilities Commission (OUC) offers rebates on a variety of energy efficient improvements for residential customers. Customers should view the program brochure on the web site listed above...

  15. PP-03 Federal Power Commission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presidential permit authorizing Federal Power Commission to construct, operate, and maintain electric transmission facilities at te U.S-Mexico border. PDF icon PP-03 Federal Power ...

  16. United Nations Economic Commission for Latin America and the...

    Open Energy Info (EERE)

    In June 1951, the Commission established the ECLAC subregional headquarters in Mexico City, which serves the needs of the Central American subregion, and in December...

  17. The Commission on Environmental Markets and Economic Performance...

    Open Energy Info (EERE)

    on Environmental Markets and Economic Performance CEMEP Jump to: navigation, search Name: The Commission on Environmental Markets and Economic Performance (CEMEP) Place: United...

  18. Commission to Review the Effectiveness of the National Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    October 23, 2015 Commission to Review the Effectiveness of the National Energy Laboratories, October 23, 2015 October 23, 2015 - 8:44am Addthis Agenda Teleconference October 23, ...

  19. Public Utilities Commission General Order NO. 131-D | Open Energy...

    Open Energy Info (EERE)

    Public Utilities Commission General Order NO. 131-D Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Public Utilities...

  20. Including Retro-Commissioning in Federal Energy Savings Performance Contracts

    Broader source: Energy.gov [DOE]

    Document describes guidance on the importance of (and steps to) including retro-commissioning in federal energy savings performance contracts (ESPCs).

  1. Oregon Land Conservation and Development Commission | Open Energy...

    Open Energy Info (EERE)

    Commission Abbreviation: LCDC Place: Portland, Oregon Website: www.oregon.govLCDpageslcdc. References: Oregon Department of Land Conservation and Development1 This...

  2. Hawaii Commission on Water Resource Management Webpage | Open...

    Open Energy Info (EERE)

    Not Provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Hawaii Commission on Water Resource Management Webpage Citation State of...

  3. Orlando Utilities Commission- Commercial Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Orlando Utilities Commission (OUC) offers rebates on a variety of energy efficient improvements for commercial customers.Prescriptive and custom incentives are available. Eligible measures include:

  4. Railroad Commission of Texas, Oil and Gas Division | Open Energy...

    Open Energy Info (EERE)

    Texas, Oil and Gas Division Jump to: navigation, search Name: Texas Railroad Commission, Oil and Gas Division Address: 1701 N. Congress Place: Texas Zip: 78711-2967 Website:...

  5. ORISE: U.S. Nuclear Regulatory Commission Radiation Exposure...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Information and Reporting System (REIRS) The U.S. Nuclear Regulatory Commission (NRC) is required by federal mandate to maintain and evaluate radiation protection data for...

  6. Dr. Brian Kalk - Chairman North Dakota Public Service Commission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Brian Kalk - Chairman North Dakota Public Service Commission. Responding to Changing Infrastructure Needs. I. Overview of the jurisdiction of the North Dakota Public Service ...

  7. Hawaii Department of Land and Natural Resources Commission on...

    Open Energy Info (EERE)

    on Water Resource Management Jump to: navigation, search Name: Hawaii Department of Land and Natural Resources Commission on Water Resource Management Address: Kalanimoku...

  8. Automated Proactive Techniques for Commissioning Air-Handling Units

    SciTech Connect (OSTI)

    Katipamula, Srinivas ); Brambley, Michael R. ); Luskay, Larry

    2003-08-30

    Many buildings today use sophisticated building automation systems (BASs) to manage a wide and varied range of building systems. Although the capabilities of the BASs seem to have increased over time, many buildings still are not properly commissioned, operated or maintained. Lack of or improper commissioning, the inability of the building operators to grasp the complex controls, and lack of proper maintenance leads to inefficient operations and reduced lifetimes of the equipment. If regularly scheduled manual maintenance or re-commissioning practices are adopted, they can be expensive and time consuming. Automated proactive commissioning and diagnostic technologies address two of the main barriers to commissioning: cost and schedules. Automated proactive continuous commissioning tools can reduce both the cost and time associated with commissioning, as well as enhance the persistence of commissioning fixes. In the long run, automation even offers the potential for automatically correcting problems by reconfiguring controls or changing control algorithms dynamically. This paper will discuss procedures and processes that can be used to automate and continuously commission the economizer operation and outdoor-air ventilation systems of an air-handling unit.

  9. Commissioning: A Highly Cost-Effective Building Energy Management Strategy

    SciTech Connect (OSTI)

    Mills, Evan

    2011-01-06

    Quality assurance and optimization are essential elements of any serious technological endeavor, including efforts to improve energy efficiency. Commissioning is an important tool in this respect. The aim of commissioning new buildings is to ensure that they deliver-if not exceed-the performance and energy savings promised by their design. When applied to existing buildings, one-time or repeated commissioning (often called retrocommissioning) identifies the almost inevitable drift in energy performance and puts the building back on course, often surpassing the original design intent. In both contexts, commissioning is a systematic, forensic approach to improving performance, rather than a discrete technology.

  10. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -----Chapter 7.1 (February 2015) ACQUISITION PLANNING Guiding Principles  Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory, and policy requirements, and reflects the mission needs of the program.  An integrated team approach that includes appropriate representation from all organizations having an interest in the requirement will benefit the acquisition planning process.  Contracting professionals

  11. ACTION PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -1 ACTION PLAN 1.0 INTRODUCTION 1.1 PURPOSE The purpose of this action plan is to establish the overall plan for hazardous waste permitting, meeting closure and postclosure requirements, and remedial action under the Federal Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), and the Washington State Hazardous Waste Management Act. All actions required to be taken pursuant to this Agreement shall be taken in accordance

  12. Thurston Regional Planning Council Helps Washingtonians Save...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (e.g., environmental concerns, sustainability, rising fuel costs, and the increase in childhood obesity); and reduce greenhouse gases, carbon footprint, and vehicle miles traveled. ...

  13. Plan Outline

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    end-use customers for measure installation or project implementation. BPA Action Plan for Energy Efficiency vi EXECUTIVE SUMMARY The Bonneville Power Administration is a leader in...

  14. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... proposals Basic research from non-profit organizations Competitive procurement of ... PLAN FOR ACTION AND ACQUISITION MANAGEMENT -- ANSWERS WHO, WHAT, WHEN, WHERE, ...

  15. 2013 Community Commitment plan approved

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community Commitment Plan Approved Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue: September 1, 2016 all issues All Issues » submit 2013 Community Commitment plan approved The plan provides funding from LANS' management fee to invest in regional education, economic development, and charitable giving programs. October 1, 2012 dummy image Read our archives Contacts Editor Linda Anderman Email Community Programs Office Kurt Steinhaus

  16. Y-12 Site Sustainability Plan

    SciTech Connect (OSTI)

    none,; Erhart, S C; Spencer, C G

    2013-12-01

    This plan addresses: Greenhouse Gas Reduction and Comprehensive Greenhouse Gas Inventory; Buildings, ESPC Initiative Schedule, and Regional and Local Planning; Fleet Management; Water Use Efficiency and Management; Pollution Prevention and Waste Reduction; Sustainable Acquisition; Electronic Stewardship and Data Centers; Renewable Energy; Climate Change; and Budget and Funding.

  17. Atomic Energy Commission Explores Peaceful Uses of Nuclear Explosions |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) Explores Peaceful Uses of Nuclear Explosions Atomic Energy Commission Explores Peaceful Uses of Nuclear Explosions Nevada Test Site, NV As part of the Plowshare program seeking to develop peaceful uses for nuclear explosives, the Atomic Energy Commission conducts the Sedan test at the Nevada Test Site

  18. Atomic Energy Commission Takes Over Responsibility for all Atomic Energy

    National Nuclear Security Administration (NNSA)

    Programs | National Nuclear Security Administration | (NNSA) Takes Over Responsibility for all Atomic Energy Programs Atomic Energy Commission Takes Over Responsibility for all Atomic Energy Program Washington, DC In accordance with the Atomic Energy Act of 1946, all atomic energy activities are transferred to the newly created Atomic Energy Commission

  19. Status of the Commissioning of SOLEIL

    SciTech Connect (OSTI)

    Filhol, J. M.; Couprie, M. E.; Level, M. P.; Besson, J. C.; Brunelle, P.; Denard, J. C.; Godefroy, J. M.; Herbeaux, C.; Lebasque, P.; Le Roux, V.; Lestrade, A.; Loulergue, A.; Marchand, P.; Nadji, A.; Nadolski, L.; Nagaoka, R.; Pottin, B.; Tordeux, M. A.

    2007-01-19

    SOLEIL is a third generation Synchrotron radiation Source, under construction in France at St Aubin, near Paris. The Storage Ring consists in a 357 m circumference ring, with 16 cells and 24 straight sections (4x12m, 12x7m, 8x3.6m), out of which up to 21 will house insertion devices. The optics, with distributed dispersion, features a low 3.7 nm.rad emittance at the 2.75 GeV operating energy, so as to provide high brilliance, from the VUV up to the hard X ray domain. In order to provide a long lifetime, and beam position stabilities in the micron range, significant attention was paid at each design stage (optics, magnets, beam position monitors, vacuum and RF systems,..), including the design of the building and infrastructure, the construction of which is now complete. This resulted in some unprecedented approaches such as the intensive use of NEG coating Aluminium vessels, or the development of a dedicated superconducting RF cavity and of 190 kW solid state RF amplifiers. The construction, started in 2002, is now completed. The injector system (100 MeV Linac) and the 3 Hz full energy Booster synchrotron have reached nominal operating conditions by fall 2005. The installation of the Storage Ring was just completed and its commissioning started in May 2006. First 9 turns in the ring were achieved on May the 14th, and visible synchrotron radiation was also observed on a CCD camera. Innovative insertion devices were designed and built so as to provide the best possible performances in an energy range as large as 5 eV to 20 keV. These are helical electromagnetic devices with 640 mm and 256 mm periods, APPLE II type undulators with 80 mm period, and in-vacuum hybrid undulators with 20 mm period. Two infra-red beamlines providing both edge and constant dipole field emission are also under construction and a superconducting wiggler is currently being designed in order to provide high flux in the 10 to 50 keV range. A first set of 10 beamlines (out of 24 included in the

  20. Topic A Awardee: Eastern Interconnection Planning Collaborative...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    process among all interested stakeholders: State and Federal policy makers ... plans developed each year by regional stakeholders in collaboration with their respective ...

  1. D0 Solenoid Commissioning September 1998

    SciTech Connect (OSTI)

    Rucinski, R.; /Fermilab

    1998-10-12

    D-Zero installed a new 2 Tesla superconducting solenoid magnet into the central tracking region of the D-Zero detector. This report documents the cryogenic performance of the superconducting solenoid during its first cryogenic operation at Fermilab. By necessity, the liquid helium refrigerator was also operated. This was the second time the refrigerator plant has been operated. The refrigerator's performance is also documented herein.

  2. Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board Decision, July 1972 - June 1995

    SciTech Connect (OSTI)

    1996-04-01

    This is the seventh edition of the Nuclear Regulatory Commission (NRC) Staff Practice and Procedure Digest. It contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to June 1995 interpreting the NRC rules of practice in 10 CFR part 2.

  3. National Clean Energy Business Plan Competition: FGC Plasma Solutions...

    Office of Environmental Management (EM)

    FGC Plasma Solutions Wins 2015 Regional Clean Energy Challenge National Clean Energy Business Plan Competition: FGC Plasma Solutions Wins 2015 Regional Clean Energy Challenge April ...

  4. 3RS action plan

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    The goal of the Solid Waste Interim Steering Committee (SWISC) process is to develop a long-term waste management system for the Greater Toronto Area (GTA), to be in place by 1996, which is environmentally, socially, economically and technically sound. This background report is being released to the public and member Regional Councils to facilitate input to the SWISC planning process. The report documents current reduction, reuse and recycling initiatives in the GTA, identifies opportunities for coordination and collaboration among the GTA communities, and develops an action plan for improving the effectiveness of the reduction, reuse and recycling efforts within the GTA.

  5. WEST COAST REGIONAL CARBON SEQUESTRATION PARTNERSHIP

    SciTech Connect (OSTI)

    Larry Myer; Terry Surles; Kelly Birkinshaw

    2004-01-01

    The West Coast Regional Carbon Sequestration Partnership is one of seven partnerships which have been established by the US Department of Energy (DOE) to evaluate carbon dioxide capture, transport and sequestration (CT&S) technologies best suited for different regions of the country. The West Coast Region comprises Arizona, California, Nevada, Oregon, Washington, and the North Slope of Alaska. Led by the California Energy Commission, the West Coast Partnership is a consortium of over thirty five organizations, including state natural resource and environmental protection agencies; national labs and universities; private companies working on CO{sub 2} capture, transportation, and storage technologies; utilities; oil and gas companies; nonprofit organizations; and policy/governance coordinating organizations. In an eighteen month Phase I project, the Partnership will evaluate both terrestrial and geologic sequestration options. Work will focus on five major objectives: (1) Collect data to characterize major CO{sub 2} point sources, the transportation options, and the terrestrial and geologic sinks in the region, and compile and organize this data via a geographic information system (GIS) database; (2) Address key issues affecting deployment of CT&S technologies, including storage site permitting and monitoring, injection regulations, and health and environmental risks (3) Conduct public outreach and maintain an open dialogue with stakeholders in CT&S technologies through public meetings, joint research, and education work (4) Integrate and analyze data and information from the above tasks in order to develop supply curves and cost effective, environmentally acceptable sequestration options, both near- and long-term (5) Identify appropriate terrestrial and geologic demonstration projects consistent with the options defined above, and create action plans for their safe and effective implementation A kickoff meeting for the West Coast Partnership was held on Sept 30-Oct

  6. Disability Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    through The Hartford. These income protection plans will pay a percentage of your salary when you are unable to work due to illness or injury. Resources STD highlight sheet ...

  7. Retirement Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of financial resources and the latest financial tools to make saving for retirement easy. ... This plan allows you to save and invest a piece of your paycheck before taxes are taken ...

  8. Evacuation Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Evacuation Planning (see also) This email address is being protected from spambots. You need JavaScript enabled to view it. - TRACC Director Background Evacuation planning in large metropolitan areas requires an analysis of the complex interactions among the initiating event, the affected population, and the systems for transporting the population and emergency responders. Predicting the effects of events, such as the dispersion of a harmful agent in the urban area or waterways, or the

  9. Commission to Review the Effectiveness of the National Energy Laboratories,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    October 23, 2015 | Department of Energy October 23, 2015 Commission to Review the Effectiveness of the National Energy Laboratories, October 23, 2015 October 23, 2015 - 8:44am Addthis Agenda Teleconference October 23, 2015 (Download Meeting Minutes) 1:00 - 1:05 PM Introduction and Roll-Call Commission Co-chairs, T.J. Glauthier and Jared Cohon 1:05 - 1:15 PM Overview of Commission Draft Report Status T.J. Glauthier 1:15 - 1:30 PM Summary of Public Comments Received Susannah Howieson and Mark

  10. Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    110 Federal Register / Vol. 80, No. 108 / Friday, June 5, 2015 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL15-69-000] Acciona Wind Energy USA LLC v. Midcontinent Independent System Operator, Inc.; Notice of Complaint Take notice that on May 27, 2015, pursuant to section 206 of the Federal Power Act, U.S.C. 824(e) and Rule 206 of the Federal Energy Regulatory Commission's (Commission) Rules of Practice and Procedure, 18 CFR 385.206, Acciona Wind Energy USA

  11. The Blue Ribbon Commission Offers Strong Step Forward | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy The Blue Ribbon Commission Offers Strong Step Forward The Blue Ribbon Commission Offers Strong Step Forward July 29, 2011 - 12:27pm Addthis Damien LaVera Damien LaVera Deputy Director, Office of Public Affairs Today, the Blue Ribbon Commission on America's Nuclear Future issued a draft of its recommendations. The Obama Administration continues to believe that nuclear energy has an important role to play as America moves to a clean energy future. As part of our commitment to restarting

  12. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEDERAL ENERGY REGULATORY COMMISSION ) Emergency Petition and Complaint of ) Docket No. EL05-145-000 District of Columbia Public Service Comm'n ) ) POTOMAC ELECTRIC POWER COMPANY'S MOTION FOR LEAVE TO ANSWER AND ANSWER TO COMMENTS AND PROTESTS Pursuant to Rules 212 and 213 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission ("FERC" or the "Commission"), 18 C.F.R. §§ 385.212 and 385.213 (2005), Potomac Electric Power Company ("Pepco")

  13. Role of the environmental management commission in North Carolina

    SciTech Connect (OSTI)

    Watkins, R.V. )

    1993-01-01

    The state of North Carolina's 17-member Environmental Management Commission is the principal regulatory and environmental policy-making body in the state for issues affecting water, air, and land resources. The author traces the evolution of environmental programs in the state, and the history of the Environmental Management Commission from its origin in 1927, and reviews the Commission's role, mission, structure, organization, function, and regulatory/public participation process. The state's environmental regulatory rulemaking process and established provisions against conflict of interest are also reviewed.

  14. Comments of the District of Columbia Public Service Commission | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy the District of Columbia Public Service Commission Comments of the District of Columbia Public Service Commission Docket No. EO-05-01: Pursuant to Order No. 202-06-1, issued by the Department of Energy ("DOE") in the above-captioned docket on February 17, 2006, the District of Columbia Public Service Commission ("DCPSC") hereby submits these Comments to provide the DOE and all interested parties with the information regarding the DCPSC's recent efforts to

  15. Renewable Electricity Benefits Quantification Methodology: A Request for Technical Assistance from the California Public Utilities Commission

    SciTech Connect (OSTI)

    Mosey, G.; Vimmerstedt, L.

    2009-07-01

    The California Public Utilities Commission (CPUC) requested assistance in identifying methodological alternatives for quantifying the benefits of renewable electricity. The context is the CPUC's analysis of a 33% renewable portfolio standard (RPS) in California--one element of California's Climate Change Scoping Plan. The information would be used to support development of an analytic plan to augment the cost analysis of this RPS (which recently was completed). NREL has responded to this request by developing a high-level survey of renewable electricity effects, quantification alternatives, and considerations for selection of analytic methods. This report addresses economic effects and health and environmental effects, and provides an overview of related analytic tools. Economic effects include jobs, earnings, gross state product, and electricity rate and fuel price hedging. Health and environmental effects include air quality and related public-health effects, solid and hazardous wastes, and effects on water resources.

  16. Lab Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab Plan Ames Laboratory

  17. PROJECT MANAGEMENT PLANS Project Management Plans

    Office of Environmental Management (EM)

    MANAGEMENT PLANS Project Management Plans Overview Project Management Plan Suggested Outline Subjects Crosswalk between the Suggested PMP Outline Subjects and a Listing ...

  18. Scaling Retro-Commissioning to Small Commercial Buildings: A Turnkey Automated Hardware-Software Solution

    SciTech Connect (OSTI)

    Lin, Guanjing; Granderson, J.; Brambley, Michael R.

    2015-07-01

    In the United States, small commercial buildings represent 51% of total floor space of all commercial buildings and consume nearly 3 quadrillion Btu (3.2 quintillion joule) of site energy annually, presenting an enormous opportunity for energy savings. Retro-commissioning (RCx), the process through which professional energy service providers identify and correct operational problems, has proven to be a cost-effective means to achieve median energy savings of 16%. However, retro-commissioning is not typically conducted at scale throughout the commercial stock. Very few small commercial buildings are retro-commissioned because utility expenses are relatively modest, margins are tighter, and capital for improvements is limited. In addition, small buildings do not have in-house staff with the expertise to identify improvement opportunities. In response, a turnkey hardware-software solution was developed to enable cost-effective, monitoring-based RCx of small commercial buildings. This highly tailored solution enables non-commissioning providers to identify energy and comfort problems, as well as associated cost impacts and remedies. It also facilitates scale by offering energy service providers the means to streamline their existing processes and reduce costs by more than half. The turnkey RCx sensor suitcase consists of two primary components: a suitcase of sensors for short-term building data collection that guides users through the process of deploying and retrieving their data and a software application that automates analysis of sensor data, identifies problems and generates recommendations. This paper presents the design and testing of prototype models, including descriptions of the hardware design, analysis algorithms, performance testing, and plans for dissemination.

  19. Task Force for Strategic Developments to Blue Ribbon Commission...

    Office of Environmental Management (EM)

    Planning Project Overview Used Nuclear Fuel Loading and Structural Performance Under Normal Conditions of Transport - Modeling, Simulation and Experimental Integration RD&D Plan...

  20. Energy Organizational Planning

    SciTech Connect (OSTI)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty control and manage their natural resource assets i.e. develop its own energy resources, meet the current and projected energy needs of their community, and sit at the table with other regional energy providers to deal with issues on a peer-to-peer basis.

  1. UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE OPERATIONS

    Office of Legacy Management (LM)

    AL, 3 UNITED STATES ATOMIC ENERGY COMMISSION OAK RIDGE OPERATIONS CINCINNATI AREA P. 0. BOX 39198, CINCINNATI 39, OHIO IN REPLY REFER TO: 0:OJT --r.LAal Cl E:c Mr. J. H. Noyes, ...

  2. Mississippi Public Service Commission Adopts Energy Efficiency Rules

    Broader source: Energy.gov [DOE]

    Mississippi Public Service Commission (PSC) approved new energy efficiency rules for electric and natural gas utility companies to offer customers several pathways to increase energy efficiency. According to the PSC, the rules could potentially s

  3. Blue Ribbon Commission on America's Nuclear Future to Hold First...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Washington, D.C. - On Thursday, March 25th and Friday, March 26th, the Blue Ribbon Commission on America's Nuclear Future, co-chaired by former Congressman Lee Hamilton and former ...

  4. Nuclear Regulatory Commission Issuances. Volume 39, No. 2

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director`s Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  5. Public Utility Commission of Texas Substantive Rule 25.101...

    Open Energy Info (EERE)

    Texas Substantive Rule 25.101(b) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Public Utility Commission of Texas...

  6. Example Retro-Commissioning Scope of Work to Include Services...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services as Part of an ESPC Investment-Grade Audit Example Retro-Commissioning Scope of Work to Include Services as Part of an ESPC Investment-Grade Audit Document offers a ...

  7. New Siemens Research Turbine Commissioned at NREL - News Releases...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    New Siemens Research Turbine Commissioned at NREL Government-industry R&D partnership is ... a new 2.3 megawatt Siemens wind turbine at NREL's National Wind Technology Center. ...

  8. Nuclear Regulatory Commission issuances, April 1994. Volume 39, No. 4

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  9. Nuclear Regulatory Commission issuances. Volume 42, No. 4

    SciTech Connect (OSTI)

    1995-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  10. UNITED STATES ATOMIC ENERGY COMMISSION SPECIAL NUCLEAR MATERIAL...

    Office of Legacy Management (LM)

    STATES ATOMIC ENERGY COMMISSION SPECIAL NUCLEAR MATERIAL LlCENSE pp.o-o 43 Licensee 1. ... Date Sepikmber 30, I.962 -6. Special Nuclear:Material SnrichedtoS I under this ...

  11. EM Boosts Efforts to Help Japan through Commission Work

    Broader source: Energy.gov [DOE]

    TOKYO – EM continues to assist Japan as it recovers from a 2011 nuclear accident through a newly formed bilateral commission established to build on the close, collaborative relationship between the U.S. and Japan.

  12. Nuclear Regulatory Commission issuances. Volume 38, No. 2

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  13. May 20 ESTAP Webinar: Commissioning Energy Storage | Department...

    Broader source: Energy.gov (indexed) [DOE]

    ET, Clean Energy State Alliance will host a webinar on the process of commissioning an energy storage system. Speakers include Dr. Imre Gyuk, Energy Storage Program Manager in the ...

  14. Federal Energy Regulatory Commission's Fiscal Year 2010 Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Commission's Fiscal Year 2010 Financial Statement Audit Report No.: OAS-FS-11-02 TO: ... The information in the Management's Discussion and Analysis is not a required part of ...

  15. NREL'S Morgan-Smith Honored by Martin Luther King Commission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ...Smith Honored by Martin Luther King Commission For more information contact: Sarah Holmes Barba, 303-275-3023 email: Sarah Barba Golden, Colo., Jan. 9, 2001 - Syl Morgan-Smith, ...

  16. OSTIblog Articles in the Commission on Science and Technology for

    Office of Scientific and Technical Information (OSTI)

    Development Topic | OSTI, US Dept of Energy Office of Scientific and Technical Information Commission on Science and Technology for Development Topic WorldWideScience Opens International Doors by Dr. Walt Warnick 06 Jun, 2011 in Personal Perspectives On May 25, 2011, I made an invited presentation in Geneva, Switzerland at the 14th session of the United Nations' Commission on Science and Technology for Development (CSTD). I want to share with you the reception WorldWideScience.org received

  17. Nuclear Regulatory Commission issuances. Volume 47, Number 3

    SciTech Connect (OSTI)

    1998-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The two issuances included here are: (1) the Commission issuance to the US Enrichment Corporation and (2) the Director`s Decision to the North Atlantic Energy Service Corporation.

  18. Guidelines and Checklist for Commissioning and Government Acceptance of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ESPC ENABLE Projects | Department of Energy and Checklist for Commissioning and Government Acceptance of ESPC ENABLE Projects Guidelines and Checklist for Commissioning and Government Acceptance of ESPC ENABLE Projects Document provides guidance and a checklist to help agencies through the final steps of the ESPC ENABLE project, including project acceptance. By accepting the work of the energy service company (ESCO), the agency is confirming that the energy conservation measures have been

  19. Federal Energy Regulatory Commission's Fiscal Year 2014 Financial Statement Audit

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Energy Regulatory Commission's Fiscal Year 2014 Financial Statement Audit OAS-FS-15-05 December 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 December 17, 2014 MEMORANDUM FOR THE CHAIRMAN, FEDERAL ENERGY REGULATORY COMMISSION FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Federal Energy Regulatory

  20. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cameron LNG, LLC and Docket Nos. CP13-25-000 Cameron Interstate, LLC CP13-27-000 NOTICE OF AVAILABILITY OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED CAMERON LIQUEFACTION PROJECT (January 10, 2014) The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a draft environmental impact statement (EIS) for the Cameron Liquefaction Project (Project), proposed by Cameron LNG, LLC and Cameron Interstate Pipeline, LLC (collectively Cameron) in the

  1. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corpus Christi Liquefaction, LLC Docket Nos. CP12-507-000 Cheniere Corpus Christi Pipeline, LP CP12-508-000 NOTICE OF AVAILABILITY OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED CORPUS CHRISTI LNG PROJECT (June 13, 2014) The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a draft environmental impact statement (EIS) for the Corpus Christi LNG Project (Project), proposed by Corpus Christi Liquefaction, LLC and Cheniere Corpus Christ Pipeline, LP

  2. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Golden Pass Products, LLC and Docket Nos. CP14-517-000 Golden Pass Pipeline, LLC CP14-518-000 NOTICE OF AVAILABILITY OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED GOLDEN PASS LNG EXPORT PROJECT (March 25, 2016) The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a draft environmental impact statement (EIS) for the Golden Pass Liquefied Natural Gas (LNG) Export Project, proposed by Golden Pass Products, LLC and Golden Pass Pipeline, LLC

  3. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ENVIRONMENTAL ASSESSMENT (January 15, 2013) In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects reviewed the Public Utility District No. 1 of Snohomish County, Washington's (Snohomish PUD) application for a 10-year pilot license for the proposed Admiralty Inlet Tidal Project No. 12690, which would be located in Admiralty Inlet

  4. Commission to Review the Effectiveness of the National Energy Laboratories

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Commission to Review the Effectiveness of the National Energy Laboratories + - Department of Energy National Laboratories Click on a National Laboratory to learn more. Hide Research Learn more about the Department of Energy's National Labs Visit this lab's site Click on a National Laboratory Employees Learn more about the Department of Energy's National Labs Visit this lab's site About the Commission Section 319 of the Consolidated Appropriations Act, 2014, Public Law

  5. Berkeley Lab Strategic Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Lab Plan Notable Outcomes Division-Level Strategic Planning Related Links labview Strategic Planning Office The Strategic Planning Office coordinates institutional...

  6. DOE Announces Webinars on Strategic Energy Planning, the Successful Commissioning of Refrigeration Systems, and More

    Broader source: Energy.gov [DOE]

    EERE offers webinars to the public on a range of subjects, from adopting the latest energy efficiency and renewable energy technologies to training for the clean energy workforce. View this week's webinars.

  7. SU-E-P-05: Is Routine Treatment Planning System Quality Assurance Necessary?

    SciTech Connect (OSTI)

    Alaei, P

    2014-06-01

    Purpose: To evaluate the variation of dose calculations using a treatment planning system (TPS) over a two year period and assessment of the need for TPS QA on regular intervals. Methods: Two phantoms containing solid water and lung- and bone-equivalent heterogeneities were constructed in two different institutions for the same brand treatment planning system. Multiple plans, consisting of photons and electron beams, including IMRT and VMAT ones, were created and calculated on the phantoms. The accuracy of dose computation in the phantoms was evaluated at the onset by dose measurements within the phantoms. The dose values at up to 24 points of interest (POI) within the solid water, lung, and bone slabs, as well as mean doses to several regions of interest (ROI), were re-calculated over a two-year period which included two software upgrades. The variations in POI and ROI dose values were analyzed and evaluated. Results: The computed doses vary slightly month-over-month. There are noticeable variations at the times of software upgrade, if the upgrade involves remodeling and/or re-commissioning of the beams. The variations are larger in certain points within the phantom, usually in the buildup region or near interfaces, and are almost non-existent for electron beams. Conclusion: Routine TPS QA is recommended by AAPM and other professional societies, and is often required by accreditation organizations. The frequency and type of QA, though, is subject to debate. The results presented here demonstrate that the frequency of these tests could be at longer intervals than monthly. However, it is essential to perform TPS QA at the time of commissioning and after each software upgrade.

  8. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    January 2011) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award

  9. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    -Chapter 7.1 (May 2012) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award

  10. SEAB Climate Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEAB Climate Action Plan SEAB Climate Action Plan A presentation on the Climate Action Plan presented by Dr. Jonathan Pershing, Deputy Assistant Secretary for Climate Change at the U.S. Department of Energy. Climate Action Plan (pdf) (998.5 KB) More Documents & Publications U.S. Energy Sector Vulnerabilities to Climate Change and Extreme Weather Climate Change and the U.S. Energy Sector: Regional Vulnerabilities and Resilience Solutions Climate Change: Energy and Community Impacts

  11. strategic-plan-for-advanced-model-development

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan for Advanced Model Development at CMAP Kermit Wies List of Authors ================ Kermit Wies Chicago Metropolitan Agency for Planning 312 386 8820 This email address is being protected from spambots. You need JavaScript enabled to view it. Abstract ========= The CMAP modeling cadre (under contract) is preparing a detailed multi-year plan for establishing advanced travel modeling in the Chicago region. A feature of the plan will be a schedule for pursuing development of

  12. Thrift Savings Plan (TSP)

    Broader source: Energy.gov [DOE]

    The Thrift Savings Plan (TSP) is a voluntary retirement savings and investment plan for federal employees.

  13. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Stewardship Environmental Protection Community Relations Plan Community Relations Plan Consultations, communications, agreements, and disagreements...

  14. Remarks by Federal Blue Ribbon Commission J. David Jameson Atlanta, GA

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal Blue Ribbon Commission J. David Jameson Atlanta, GA October 18, 2011 Good Morning. I am David Jameson. I am President and CEO of the Greater Aiken, South Carolina, Chamber of Commerce. I am here today in my capacity as current Chairman of the SRS Community Reuse Organization. The SRSCRO is a non-profit regional group supporting economic diversification and job creation in a five-county in Georgia and South Carolina near the Department of Energy's Savannah River Site. We are unique among

  15. Alaska Strategic Energy Plan and Planning Handbook | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook The Alaska Strategic Energy Plan and Planning Handbook, published by the ...

  16. Nuclear Regulatory Commission Handling of Beyond Design Basis Events for Nuclear Power Reactors

    Broader source: Energy.gov [DOE]

    Presenter: Bill Reckley, Chief, Policy and Support Branch, Japan Lessons-Learned Project Directorate, Office of Nuclear Reactor Regulation, US Nuclear Regulatory Commission US Nuclear Regulatory Commission

  17. Letter on the Interim Report of the Commission to Review the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories Letter on the Interim Report of the Commission to Review the Effectiveness of the ...

  18. FINAL REPORT-COMMISSION TO REVIEW THE EFFECTIVENESS OF THE NATIONAL...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Commission convened its final meeting in a public teleconference on October 23, 2015. At this meeting, the Commission outlined comments received on its final report during the ...

  19. Blue Ribbon Commission on America's Nuclear Future: Report to the Secretary of Energy

    SciTech Connect (OSTI)

    2012-01-01

    Preamble The Blue Ribbon Commission on America’s Nuclear Future (BRC) was formed by the Secretary of Energy at the request of the President to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle and recommend a new strategy. It was co-chaired by Rep. Lee H. Hamilton and Gen. Brent Scowcroft. Other Commissioners are Mr. Mark H. Ayers, the Hon. Vicky A. Bailey, Dr. Albert Carnesale, Sen. Pete Domenici, Ms. Susan Eisenhower, Sen. Chuck Hagel, Mr. Jonathan Lash, Dr. Allison M. Macfarlane, Dr. Richard A. Meserve, Dr. Ernest J. Moniz, Dr. Per Peterson, Mr. John Rowe, and Rep. Phil Sharp. The Commission and its subcommittees met more than two dozen times between March 2010 and January 2012 to hear testimony from experts and stakeholders, to visit nuclear waste management facilities in the United States and abroad, and to discuss the issues identified in its Charter. Additionally, in September and October 2011, the Commission held five public meetings, in different regions of the country, to hear feedback on its draft report. A wide variety of organizations, interest groups, and individuals provided input to the Commission at these meetings and through the submission of written materials. Copies of all of these submissions, along with records and transcripts of past meetings, are available at the BRC website (www.brc.gov). This report highlights the Commission’s findings and conclusions and presents recommendations for consideration by the Administration and Congress, as well as interested state, tribal and local governments, other stakeholders, and the public.

  20. Regional Purchasing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Regional Partnerships Regional Partnerships DOE's Regional Carbon Sequestration Partnerships Program DOE has created a network of seven Regional Carbon Sequestration Partnerships (RCSPs) to help develop the technology, infrastructure, and regulations to implement large-scale CO2 storage (also called carbon sequestration) in different regions and geologic formations within the Nation. Collectively, the seven RCSPs represent regions encompassing: 97 percent of coal-fired CO2 emissions; 97 percent

  1. STRATEGIC PLAN

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 STRATEGIC PLAN and Implementing Framework United States Department of Energy Office of Energy Efficiency and Renewable Energy (This page intentionally left blank) Message from the Assistant Secretary 1 Message from the Assistant Secretary Today, the United States is faced with a national imperative to address the enormous challenge presented by climate change and to seize upon the multi-trillion dollar economic opportunity that a transition to a global clean energy economy will provide. In his

  2. Commissioning of the Ground Test Accelerator Intertank Matching Section

    SciTech Connect (OSTI)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Cole, R.; Connolly, R.; Gilpatrick, J.D.; Ingalls, W.B.; Kersteins, D.; Little, C.; Lohsen, R.A.; Lysenko, W.P.; Mottershead, C.T.; Power, J.; Rusthoi, D.P.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 keV H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the IMS beam experiments will be presented.

  3. Commissioning of the Ground Test Accelerator Intertank Matching Section

    SciTech Connect (OSTI)

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Cole, R.; Connolly, R.; Gilpatrick, J.D.; Ingalls, W.B.; Kersteins, D.; Little, C.; Lohsen, R.A.; Lysenko, W.P.; Mottershead, C.T.; Power, J.; Rusthoi, D.P.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-09-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H{sup {minus}} beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 keV H{sup {minus}} injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2{beta}{gamma} Drift Tube Linac (DTL-1) module, the 8.7 MeV 2{beta}{gamma} DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the IMS beam experiments will be presented.

  4. OPPORTUNITIES IN SMR EMERGENCY PLANNING

    SciTech Connect (OSTI)

    Moe, Wayne

    2014-06-01

    This paper discusses the results of a cost/benefit-oriented assessment related to sizing of the emergency planning zones (EPZs) for advanced, small modular reactors (SMRs). An appropriately sized EPZ could result in significant cost savings for SMR licensees. Papers published by the U.S. Nuclear Regulatory Commission and other organizations discuss the applicability of current emergency preparedness regulatory requirements to SMRs, including determining an appropriate EPZ size. Both the NRC and the industry recognize that a methodology should be developed for determining appropriate EPZ sizing for SMRs. Relative costs for smaller EPZs envisioned for SMRs have been assessed qualitatively as discussed in this paper. Building off the foundation provided in the earlier papers, this paper provides a quantitative cost/benefit-oriented assessment of offsite emergency planning costs for EPZ sizes that may be justified for SMRs as compared to costs typically incurred for the current fleet of U.S. nuclear power plants. This assessment determined that a licensee utilizing a smaller EPZ could realize significant savings in offsite emergency planning costs over the nominal 40-year lifetime for an SMR. This cost/benefit-oriented assessment suggests that a reduction of the plume exposure pathway EPZ from 10 miles to the site boundary could reduce offsite emergency planning related costs by more than 90% over the 40 year life of a typical single unit nuclear power plant.

  5. Commission to Review the Effectiveness of the National Energy Laboratories,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 24, 2015 | Department of Energy March 24, 2015 Commission to Review the Effectiveness of the National Energy Laboratories, March 24, 2015 March 24, 2015 - 11:12am Addthis Agenda Magnolia Room (lobby level) Hilton Alexandria Mark Center Hotel 5000 Seminary Road, Alexandria, VA 22311 March 24, 2015 (Download Meeting Minutes) 10:30 - 10:35 AM Introduction Commission Co-chairs, T.J. Glauthier and Jared Cohon 10:35 AM - 11:45 PM HQ Perspective of DOE Oversight Joseph McBrearty, Deputy

  6. Commission to Review the Effectiveness of the National Energy Laboratories,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    May 22, 2015 | Department of Energy May 22, 2015 Commission to Review the Effectiveness of the National Energy Laboratories, May 22, 2015 May 22, 2015 - 3:35pm Addthis Agenda SLAC National Accelerator Laboratory Kavli Auditorium, Bldg. 51 (Kavli Building) 2575 Sand Hill Road May 22, 2015 (Download Meeting Minutes) 9:00 - 9:05 AM Introduction Commission Co-chairs, T.J. Glauthier and Jared Cohon 9:05 - 10:00 AM Laboratory Directors (Download Presentations) Chi-Chang Kao, SLAC National

  7. Indexes to Nuclear Regulatory Commission issuances, July--September 1997

    SciTech Connect (OSTI)

    1998-03-01

    This digest and index lists the Nuclear Regulatory Commission (NRC) issuances for July to September 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. There are five sections to this index: (1) case name index, (2) headers and digests, (3) legal citations index, (4) subject index, and (5) facility index. The digest provides a brief narrative of the issue, including the resolution of the issue and any legal references used for resolution.

  8. Nuclear Regulatory Commission Issuances: February 1995. Volume 41, Number 2

    SciTech Connect (OSTI)

    1995-02-01

    This book contains an issuance of the Nuclear Regulatory Commission and a Director`s Decision. The issuance concerns consideration by the Commission of appeals from both the Initial Decision and a Reconsideration Order issued by the Presiding Officer involving two materials license amendment applications filed by the University of Missouri. The Director`s Decision from the Office of Enforcement denies petitions filed by Northeast Utilities employees requesting that accelerated enforcement action be taken against Northeast Utilities for activities concerned with NU`s fitness-for-duty program.

  9. Department of Energy Commends the Nuclear Regulatory Commission's Approval

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of a Second Early Site Permit in Just One Month | Department of Energy Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month Department of Energy Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month March 27, 2007 - 12:10pm Addthis The Entergy Corporation's Grand Gulf Site in Mississippi Receives NRC Approval for an ESP WASHINGTON, DC - The U.S. Department of Energy (DOE) today applauded the

  10. DOE Takes Steps to Implement the National Broadband Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Takes Steps to Implement the National Broadband Plan DOE Takes Steps to Implement the National Broadband Plan May 11, 2010 - 12:54pm Addthis The Department of Energy has announced that it is taking steps to implement energy-related recommendations included in the National Broadband Plan, released by the Federal Communications Commission (FCC) in March. The plan included recommendations on a wide range of topics from expanding internet access to modernizing health information to

  11. SU-E-T-560: Commissioning An HDR Freiburg Flap Applicator for Skin Lesion Treatment

    SciTech Connect (OSTI)

    Dou, K; Li, B; Lerma, F; Aroumougame, V; Sarfaraz, M; Laser, B; Jacobs, M

    2014-06-01

    Purpose: Flexible Freiburg flap used with high dose rate afterloaders is easy to cut into any size for any body site and to dwell with a precise source position, conforms to curved skin surface and then to the planned target. However, unlike intracavity or interstitial situations, incomplete scatter environment due to flap applicators exposed to air might lead to dose difference between the delivered and planned. This research is focused on the dose deviation of incomplete scatter versus full scatter. Methods: A 12x12 cm of Freiburg flap applicator was used for the validation. A Nucletron Oncentra Brachy Ver. 4.3 treatment planning system (TPS) was used for treatment planning. However, no heterogeneity correction incorporated into the brachytherap TPS needs to be considered. A Philips Brilliance CT Big Bore was employed for CT scan. Radiation was delivered using a Nucletron HDR remote afterloader system. A 10cm bolus was used to cover the flap for obtaining a full scatter. An OSL, ion chamber, and Gafchromic EBT2 film were used for commissioning the flap applicator. Results: The applicator calibration at 5mm depth was performed using an OSL dosimeter. Applicator source dwelling positions with 1D and 2D array exposed to and recorded by Gafchromic EBT2 film showed an agreement within 1mm. 1D array of Freiburg flap exhibited 4.2% cooler in dose with incomplete scatter than full scatter. 2D array showed 7.1% lower in dose for incomplete scatter than full scatter. The deviation was found more than 10% beyond 8cm in depth. Conclusion: Significant dose deviation caused by the incomplete scatter environment was found to be 7.1% at 1cm depth. This deviation was increased with increasing depth. The inaccuracy resulted from the incomplete scatter can be fixed by either placing a bolus on the top of the flap or making the plan at least 7% hotter.

  12. Who plans for health improvement? SEA, HIA and the separation of spatial planning and health planning

    SciTech Connect (OSTI)

    Bond, Alan; Cave, Ben; Ballantyne, Rob

    2013-09-15

    This study examines whether there is active planning for health improvement in the English spatial planning system and how this varies across two regions using a combination of telephone surveys and focus group interviews in 2005 and 2010. The spatial planning profession was found to be ill-equipped to consider the health and well-being implications of its actions, whilst health professionals are rarely engaged and have limited understanding and aspirations when it comes to influencing spatial planning. Strategic Environmental Assessment was not considered to be successful in integrating health into spatial plans, given it was the responsibility of planners lacking the capacity to do so. For their part, health professionals have insufficient knowledge and understanding of planning and how to engage with it to be able to plan for health gains rather than simply respond to health impacts. HIA practice is patchy and generally undertaken by health professionals outside the statutory planning framework. Thus, whilst appropriate assessment tools exist, they currently lack a coherent context within which they can function effectively and the implementation of the Kiev protocol requiring the engagement of health professionals in SEA is not to likely improve the consideration of health in planning while there continues to be separation of functions between professions and lack of understanding of the other profession. -- Highlights: ? Health professionals have limited aspirations for health improvement through the planning system. ? Spatial planners are ill-equipped to understand the health and well-being implications of their activities. ? SEA and HIA currently do not embed health consideration in planning decisions. ? The separation of health and planning functions is problematic for the effective conduct of SEA and/or HIA.

  13. WECC releases its first-ever transmission plan for the Western Interconnection

    Broader source: Energy.gov [DOE]

    The Western Electricity Coordinating Council (WECC) announced the release of its first 10-Year Regional Transmission Plan (Plan) for the Western Interconnection.

  14. NSLS-II injector commissioning and initial operation

    SciTech Connect (OSTI)

    Bacha, B.; Blum, E.; Bassi, B.; Bengtsson, J.; Blednykh, A.; Buda, S.; Cheng, W.; Choi, J.; Cuppolo, J.; D Alsace, R.; Davidsaver, M.; DeLong, J.; Doom, L.; Durfee, d.; fliller, R.; Fulkerson, M.; Ganetis, G.; Gao, F.; Gardner, C.; Guo, W.; Heese, R.; Hidaka, Y.; Hu, Y.; Johanson, M.; Kosciuk, B.; Kowalski, S.; Dramer, S.; Krinsky, S.; Li, Y.; Louie, W.; Maggipinto, M.; Marino, P.; Mead, J.; Oliva, G.; Padrazo, D.; Pedersen, K.; Podobedov, B.; Rainer, R.; Rose, J.; Santana, M.; Seletskiy, S.; Shaftan, T.; Singh, O.; Singh, P.; Smalyuk, V.; Smith, R.; Summers, T.; Tagger, J.; Tian, Y.; Wahl, W.; Wang, G.; Weiner, G.; Willeke, F.; Yang, L.; Yang, X.; Zeitler, E.; Zitvogel, E.; Zuhoski, P.

    2015-05-03

    The injector for the National Synchrotron Light Source II (NSLS-II) storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle in a train of bunches up to 300 ns long. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC, this has proven to be more than sufficient for storage ring commissioning and operation. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of linac and booster operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed.

  15. Monitoring and Commissioning Verification Algorithms for CHP Systems

    SciTech Connect (OSTI)

    Brambley, Michael R.; Katipamula, Srinivas; Jiang, Wei

    2008-03-31

    This document provides the algorithms for CHP system performance monitoring and commissioning verification (CxV). It starts by presenting system-level and component-level performance metrics, followed by descriptions of algorithms for performance monitoring and commissioning verification, using the metric presented earlier. Verification of commissioning is accomplished essentially by comparing actual measured performance to benchmarks for performance provided by the system integrator and/or component manufacturers. The results of these comparisons are then automatically interpreted to provide conclusions regarding whether the CHP system and its components have been properly commissioned and where problems are found, guidance is provided for corrections. A discussion of uncertainty handling is then provided, which is followed by a description of how simulations models can be used to generate data for testing the algorithms. A model is described for simulating a CHP system consisting of a micro-turbine, an exhaust-gas heat recovery unit that produces hot water, a absorption chiller and a cooling tower. The process for using this model for generating data for testing the algorithms for a selected set of faults is described. The next section applies the algorithms developed to CHP laboratory and field data to illustrate their use. The report then concludes with a discussion of the need for laboratory testing of the algorithms on a physical CHP systems and identification of the recommended next steps.

  16. First beam commissioning at BNL ERL SRF Gun

    SciTech Connect (OSTI)

    Xu, W.; Altinbas, Z.; Belomestnykh, S.; Ben-Zvi, I.; Deonarine, S.; DeSanto, L.; Gassner, D.; Gupta, R. C.; Hahn, H.; Hammons, L.; Ho, C.; Jamilkoski, J.; Kankiya, P.; Kayran, D.; Kellerman, R.; Laloudakis, N.; Lambiase, R.; Liaw, C.; Litvinenko, V.; Mahler, G.; Masi, L.; McIntyre, G.; Miller, T.; Philips, D.; Ptitsyn, V.; Seda, T.; Sheehy, B.; Smith, K.; Rao, T.; Steszyn, A.; Tallerico, T.; Than, R.; Tuozollo, J.; Wang, E.; Weiss, D.; Wiliniski, M.; Zaltsman, A.

    2015-05-03

    The 704 MHz SRF gun successfully generated the first photoemission beam in November of 2014. The configurations of the test and the sub-systems are described.The latest results of SRF commissioning, including the cavity performance, cathode QE measurements, beam current/energy measurements, are presented in the paper.

  17. US Nuclear Regulatory Commission organization charts and functional statements

    SciTech Connect (OSTI)

    1997-11-01

    This document contains organization charts for the U.S. Nuclear Regulatory Commission (NRC) and for the five offices of the NRC. Function statements are provided delineating the major responsibilities and operations of each office. Organization and function are provided to the branch level. The head of each office, division, and branch is also listed.

  18. Methods for Automated and Continuous Commissioning of Building Systems

    SciTech Connect (OSTI)

    Larry Luskay; Michael Brambley; Srinivas Katipamula

    2003-04-30

    Avoidance of poorly installed HVAC systems is best accomplished at the close of construction by having a building and its systems put ''through their paces'' with a well conducted commissioning process. This research project focused on developing key components to enable the development of tools that will automatically detect and correct equipment operating problems, thus providing continuous and automatic commissioning of the HVAC systems throughout the life of a facility. A study of pervasive operating problems reveled the following would most benefit from an automated and continuous commissioning process: (1) faulty economizer operation; (2) malfunctioning sensors; (3) malfunctioning valves and dampers, and (4) access to project design data. Methodologies for detecting system operation faults in these areas were developed and validated in ''bare-bones'' forms within standard software such as spreadsheets, databases, statistical or mathematical packages. Demonstrations included flow diagrams and simplified mock-up applications. Techniques to manage data were demonstrated by illustrating how test forms could be populated with original design information and the recommended sequence of operation for equipment systems. Proposed tools would use measured data, design data, and equipment operating parameters to diagnosis system problems. Steps for future research are suggested to help more toward practical application of automated commissioning and its high potential to improve equipment availability, increase occupant comfort, and extend the life of system equipment.

  19. 2013 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  20. 2014 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  1. 2015 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  2. DOE CONTRACTOR PENSION PLANS

    Broader source: Energy.gov (indexed) [DOE]

    ... plan(s) to maximize the contribution predictability (i.e. forecasting accuracy) and contain current and future costs, to include rationale for selection of all plan assumptions ...

  3. ORISE: Exercise Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Exercise Planning Exercise Planning The Oak Ridge Institute for Science and Education (ORISE) helps federal, state and local emergency management personnel plan and prepare for the...

  4. US Nuclear Regulatory Commission functional organization charts, March 15, 1993. Revision 16

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  5. Business Plan in Brief : Draft.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1994-06-01

    Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA`s draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA`s first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization.

  6. Ex Parte Meeting between DOE and California Energy Commission Docket No

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE2008BTSTD0005 RIN 1904AB57 | Department of Energy between DOE and California Energy Commission Docket No EERE2008BTSTD0005 RIN 1904AB57 Ex Parte Meeting between DOE and California Energy Commission Docket No EERE2008BTSTD0005 RIN 1904AB57 The California Energy Commission (Energy Commission) expressed concern about the differences in the stringency of California standards and the proposed DOE standards. The Energy Commission requested that DOE revise its cost-effectiveness analysis based

  7. DEPARTMENT OF ENERGY CHARTER FOR THE COMMISSION TO REVIEW THE EFFECTIVENESS OF

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FOR THE COMMISSION TO REVIEW THE EFFECTIVENESS OF THE NATIONAL ENERGY LABO RA TORIES 1. Committee's Official Designation: Commission to Review the Effectiveness of the National Energy Laboratories (Commission on Labs) 2. Authority: This charter establishes the Commission pursuant to section 319 of the Consolidated Appropriations Act, 2014, Public Law No. 113-76. The Commission is being established in accordance with the provisions of the Federal Advisory Committee Act (FACA), as amended, 5

  8. Annual Training Plan Template

    Broader source: Energy.gov [DOE]

    The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

  9. DOE and FERC Jointly Submit Implementation Proposal for The National Action Plan on Demand Response to Congress

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy and the Federal Energy Regulatory Commission (FERC) jointly submitted to Congress a required “Implementation Proposal for The National Action Plan on Demand Response.”

  10. SciFri PM: Dosimetry06: Commissioning of a 3D patient specific QA system for hypofractionated prostate treatments

    SciTech Connect (OSTI)

    Rivest, R; Venkataraman, S; McCurdy, B

    2014-08-15

    The objective of this work is to commission the 6MV-SRS beam model in COMPASS (v2.1, IBA-Dosimetry) and validate its use for patient specific QA of hypofractionated prostate treatments. The COMPASS system consists of a 2D ion chamber array (MatriXX{sup Evolution}), an independent gantry angle sensor and associated software. The system can either directly calculate or reconstruct (using measured detector responses) a 3D dose distribution on the patient CT dataset for plan verification. Beam models are developed and commissioned in the same manner as a beam model is commissioned in a standard treatment planning system. Model validation was initially performed by comparing both COMPASS calculations and reconstructions to measured open field beam data. Next, 10 hypofractionated prostate RapidArc plans were delivered to both the COMPASS system and a phantom with ion chamber and film inserted. COMPASS dose distributions calculated and reconstructed on the phantom CT dataset were compared to the chamber and film measurements. The mean ( standard deviation) difference between COMPASS reconstructed dose and ion chamber measurement was 1.4 1.0%. The maximum discrepancy was 2.6%. Corresponding values for COMPASS calculation were 0.9 0.9% and 2.6%, respectively. The average gamma agreement index (3%/3mm) for COMPAS reconstruction and film was 96.7% and 95.3% when using 70% and 20% dose thresholds, respectively. The corresponding values for COMPASS calculation were 97.1% and 97.1%, respectively. Based on our results, COMPASS can be used for the patient specific QA of hypofractionated prostate treatments delivered with the 6MV-SRS beam.

  11. Navajo Nation Navajo-Hopi Land Commission Feasibility Study for...

    Broader source: Energy.gov (indexed) [DOE]

    ... line & Hwy 371 (data directory hidden, slope layer still on) substation compressor station natural gas pipeline IS Route 7290 Conduct all planning Define boundaries ...

  12. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SUPPLEMENTAL NOTICE OF PUBLIC SCOPING MEETINGS FOR THE PLANNED ALASKA LNG PROJECT (October ... impact statement (EIS) for the Alaska LNG Project involving construction and ...

  13. CEBAF SRF Performance during Initial 12 GeV Commissioning

    SciTech Connect (OSTI)

    Bachimanchi, Ramakrishna; Allison, Trent; Daly, Edward; Drury, Michael; Hovater, J; Lahti, George; Mounts, Clyde; Nelson, Richard; Plawski, Tomasz

    2015-09-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of eleven new 100 MV cryomodules (88 cavities). The superconducting RF cavities are designed to operate CW at an accelerating gradient of 19.3 MV/m with a QL of 3×107. Not all the cavities were operated at the minimum gradient of 19.3 MV/m with the beam. Though the initial 12 GeV milestones were achieved during the initial commissioning of CEBAF, there are still some issues to be addressed for long term reliable operation of these modules. This paper reports the operational experiences during the initial commissioning and the path forward to improve the performance of C100 (100 MV) modules.

  14. Commissioning tools for life-cycle building performance assurance

    SciTech Connect (OSTI)

    Piette, M.A.

    1996-05-01

    This paper discusses information systems for building life-cycle performance analysis and the use of computer-based commissioning tools within this context. There are many reasons why buildings do not perform in practice as well as intended at the design stage. One reason is the lack of commissioning. A second reason is that design intent is not well documented, and performance targets for building components and systems are not well specified. Thus, criteria for defining verification and functional tests is unclear. A third reason is that critical information is often lost throughout the building life-cycle, which causes problems such as misunderstanding of operational characteristics and sequences and reduced overall performance. The life-cycle building performance analysis tools project discussed in this paper are focused on chillers and cooling systems.

  15. COMMISSIONING AND OPERATION OF THE CEBAF 100 MV CRYOMODULES

    SciTech Connect (OSTI)

    Allison, Trent; Davis, G; Drury, Michael; Harwood, Leigh; Hogan, John; Kimber, Andrew; Lahti, George; Merz, William; Nelson, Richard; Plawski, Tomasz; Seidman, David; Spata, Michael; Wilson, Michael

    2012-07-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of ten new 100 MV cryomodules and RF systems. The superconducting RF cavities are designed to operate CW at a maximum accelerating gradient of 19.3 MV/m. To support the higher gradients and higher Q{sub L} ({approx} 3 x 10{sup 7}), a new RF system has been developed and is being installed to power and control the cavities. The RF system employs digital control and 13 kW klystrons. Recently, two of these cryomodules and associated RF hardware and software have been installed and commissioned in the CEBAF accelerator. Electrons at linac currents up to 540 {micro}A have been successfully accelerated and used for nuclear physics experiments. This paper reports on the commissioning and operation of the RF system and cryomodules.

  16. Nuclear Regulatory Commission Information Digest 1994 edition. Volume 6

    SciTech Connect (OSTI)

    Stadler, L.

    1994-03-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRCs regulatory responsibility the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear-and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1993, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

  17. The Spallation Neutron Source Beam Commissioning and Initial Operations

    SciTech Connect (OSTI)

    Henderson, Stuart; Aleksandrov, Alexander V.; Allen, Christopher K.; Assadi, Saeed; Bartoski, Dirk; Blokland, Willem; Casagrande, F.; Campisi, I.; Chu, C.; Cousineau, Sarah M.; Crofford, Mark T.; Danilov, Viatcheslav; Deibele, Craig E.; Dodson, George W.; Feshenko, A.; Galambos, John D.; Han, Baoxi; Hardek, T.; Holmes, Jeffrey A.; Holtkamp, N.; Howell, Matthew P.; Jeon, D.; Kang, Yoon W.; Kasemir, Kay; Kim, Sang-Ho; Kravchuk, L.; Long, Cary D.; McManamy, T.; Pelaia, II, Tom; Piller, Chip; Plum, Michael A.; Pogge, James R.; Purcell, John David; Shea, T.; Shishlo, Andrei P; Sibley, C.; Stockli, Martin P.; Stout, D.; Tanke, E.; Welton, Robert F; Zhang, Y.; Zhukov, Alexander P

    2015-09-01

    The Spallation Neutron Source (SNS) accelerator delivers a one mega-Watt beam to a mercury target to produce neutrons used for neutron scattering materials research. It delivers ~ 1 GeV protons in short (< 1 us) pulses at 60 Hz. At an average power of ~ one mega-Watt, it is the highest-powered pulsed proton accelerator. The accelerator includes the first use of superconducting RF acceleration for a pulsed protons at this energy. The storage ring used to create the short time structure has record peak particle per pulse intensity. Beam commissioning took place in a staged manner during the construction phase of SNS. After the construction, neutron production operations began within a few months, and one mega-Watt operation was achieved within three years. The methods used to commission the beam and the experiences during initial operation are discussed.

  18. Nuclear Regulatory Commission Information Digest 1992 edition. Volume 4

    SciTech Connect (OSTI)

    Olive, K

    1992-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. This digest is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and industry it regulates. In general, the data cover 1975 through 1991, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed.

  19. Transmission planning in the era of integrated resource planning: A survey of recent cases

    SciTech Connect (OSTI)

    Baldick, R.; Kahn, E.P.

    1992-09-01

    State action is critical to the expansion of the high-voltage transmission network, because regulated utilities must seek approval from utility commissions for proposals to site new lines. It is the purpose of this report to survey the regulatory treatment of issues that are unique to or ubiquitous in transmission planning and use. The authors review recent transmission siting cases to examine how the issues are presented to and resolved by state regulatory commissions and to provide a perspective for more general discussion of transmission policy. Their primary focus is on planning issues. Transmission capacity expansion is not typically treated in integrated resource planning. It is usually assumed that there is adequate transmission to achieve any particular plan. The authors believe that one important reason for this omission is the inherent complexity of transmission system expansion. Regulators and competitors may be at a serious disadvantage in negotiating or adjudicating specific transmission proposals with utilities, who generally have greater knowledge of both general technological considerations and case specifics. This problem of asymmetric information must be addressed at some level in planning or dispute resolution. However, they observe that explicit consideration of the information problem is absent from most regulatory and technical analysis of transmission. The goal of this survey is to share knowledge about the problems facing state regulators over the siting of new transmission facilities, and help to define constructive approaches to them.

  20. Critical review of studies on atmospheric dispersion in coastal regions

    SciTech Connect (OSTI)

    Shearer, D.L.; Kaleel, R.J.

    1982-09-01

    This study effort was required as a preliminary step prior to initiation of field measurements of atmospheric dispersion in coastal regions. The Nuclear Regulatory Commission (NRC) is in the process of planning an extensive field measurement program to generate data which will serve as improved data bases for licensing decisions, confirmation of regulations, standards, and guides, and for site characterizations. The study being reported here is an effort directed to obtaining as much information as is possible from existing studies that is relevant toward NRC's objectives. For this study, reports covering research and meteorological measurements conducted for industrial purposes, utility needs, military objectives, and academic studies were obtained and critically reviewed in light of NRC's current data needs. This report provides an interpretation of the extent of existing usable information, an indication of the potential for tailoring existing research toward current NRC information needs, and recommendations for several follow-on studies which could provide valuable additional information through reanalysis of the data. Recommendations are also offered regarding new measurement programs. Emphasis is placed on the identification and acquisition of data from atmospheric tracer studies conducted in coastal regions. A total of 225 references were identified which deal with the coastal atmosphere, including meteorological and tracer measurement programs, theoretical descriptions of the relevant processes, and dispersion models.

  1. Commissioning of the Fresno, California, Retrofit Unoccupied Test House

    SciTech Connect (OSTI)

    Stecher, D.; Imm, C.

    2013-06-01

    Commissioning of instrumentation and limited short-term testing have been completed on a retrofit unoccupied test house in Fresno, California. This house is intended to be used as a laboratory in which several different methods of space conditioning distribution will be evaluated. This report provides background on the project, including specifications of the house and models used in its development, along with models to be evaluated through its operation.

  2. UNITED STATES ATOMIC ENERGY COMMISSION CHICAGO OPERATIONS OFFICE

    Office of Legacy Management (LM)

    $$ ,_, . UNITED STATES ATOMIC ENERGY COMMISSION CHICAGO OPERATIONS OFFICE TELEPHONE 9600 SOUTH CASS AVENUE (312) 739-7711 ARCONNE. ILLINOIS 60439 ^,/" _. i ' > ;.:a c. JAN 17 1975 Martin B. Biles, Director Division of Operational Safety, HQ _ DISPOSAL OF SCRAP COPPER, CYCLOTRON DISMANTLING PROJECT, NUCLEAR RESEARCH CENTER, CARNEGIE-MELLON UNIVERSITY (CMU) Enclosed for your information is a copy of the October 28, 1974, letter from T. Morris (CMD) to J. Krupa (CH) with pages 1-4 and 8-16

  3. Louisiana Blue Ribbon Commission on Bayou Corne Safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Blue Ribbon Commission on Bayou Corne Safety - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management

  4. UNITED STATES ATOMIC ENERGY COMMISSION CHICAGO OPERATIONS OFFICE

    Office of Legacy Management (LM)

    &al IL.6 . . UNITED STATES ATOMIC ENERGY COMMISSION CHICAGO OPERATIONS OFFICE 9800 SOUTH CASS AVENUE ARGONNE, ILLINOIS 60439 ztc.&-jj TELEPHONE (312) 739-7711 NOV I 2 1974 Martin B. Biles, Director Division of Operational Safety, HQ RADIOLOGICAL CONDITION SURVEYS OF REAL PROPERTY Reference: Memorandum, Bauer to Biles, dated g/3/74 Enclosed for your information and use is a copy of the September 25, 1974, letter, Neal (ANL) to Manager (CH), with attachments which contain material

  5. UNITED STATES ATOMIC ENERGY COMMISSION NEVADA OPERATIONS OFFICE

    Office of Legacy Management (LM)

    UNITED STATES ATOMIC ENERGY COMMISSION NEVADA OPERATIONS OFFICE . MASTER .r NVO-152 DECEMBER 1974 Las Vegas, Nevada i, SUMMARY RIEPORT , . I ' i (ENT~ALNEVAD~TESTAREA D'lEMOBILIZATION AND '. !: RESTORATION ACTIVITIES --- -- --.- _.-~., ......~~-- . 1;/ , ",' NVO-152' ~ ~ .. I * , * " I ~I 'I 'I I~ I: I I I' I I. :."S;_~:.., 1'0" ,. <:. .* I DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United

  6. Nuclear Regulatory Commission Issuances. Volume 45, No. 3

    SciTech Connect (OSTI)

    1997-03-01

    This report includes the issuances received in March 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. 10 issuances were received: Louisiana Energy Services (2 issuances); Illinois Power Company and Soyland Power Cooperative; Ralph. L. Tetrick; University of Cincinnati; Consumers Power Company; Entergy Operations, Inc.; Georgia Power Company; Westinghouse Electric Corporation; and Wisconsin Electric Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  7. Commissioning and Operation of 12 GeV CEBAF

    SciTech Connect (OSTI)

    Freyberger, Arne P.

    2015-09-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) located at the Thomas Jefferson National Accelerator Laboratory (JLab) has been recently upgraded to deliver continuous electron beams to the experimental users at a maximum energy of 12 GeV, three times the original design energy of 4 GeV. This paper will present an overview of the upgrade, referred to as the 12GeV upgrade, and highlights from recent beam commissioning results.

  8. Analysis on linac quadrupole misalignment in FACET commissioning 2012

    SciTech Connect (OSTI)

    Sun, Yipeng; /SLAC

    2012-07-05

    In this note, the analysis on linac quadrupole misalignment is presented for the FACET linac section LI05-09 plus LI11-19. The effectiveness of the beam-based alignment technique is preliminarily confirmed by the measurement. Beam-based alignment technique was adopted at SLAC linac since SLC time. Here the beam-based alignment algorithms are further developed and applied in the FACET commissioning during 2012 run.

  9. Commissioning results from the recently upgraded RHIC LLRF system

    SciTech Connect (OSTI)

    Smith, K.S.; Harvey, M.; Hayes, T.; Narayan, G.; Severino, F.; Yuan, S.; Zaltsman, A.

    2011-03-28

    During RHIC Run 10, the first phase of the LLRF Upgrade was successfully completed. This involved replacing the aging VME based system with a modern digital system based on the recently developed RHIC LLRF Upgrade Platform, and commissioning the system as part of the normal RHIC start up process. At the start of Run 11, the second phase of the upgrade is underway, involving a significant expansion of both hardware and functionality. This paper will review the commissioning effort and provide examples of improvements in system performance, flexibility and scalability afforded by the new platform. The RHIC LLRF upgrade is based on the recently developed RHIC LLRF Upgrade Platform. The major design goals of the platform are: (1) Design a stand alone, generic, digital, modular control architecture which can be configured to satisfy all of the application demands we currently have, and which will be supportable and upgradeable into the foreseeable future; and (2) It should integrate seamlessly into existing controls infrastructure, be easy to deploy, provide access to all relevant control parameters (eliminate knobs), provide vastly improved diagnostic data capabilities, and permit remote reconfiguration. Although the system is still in its infancy, we think the initial commissioning results from RHIC indicate that these goals have been achieved, and that we've only begun to realize the benefits the platform provides.

  10. Handling radiation generated during an ion source commissioning

    SciTech Connect (OSTI)

    Ren, H. T.; Zhao, J. Peng, S. X.; Lu, P. N.; Zhou, Q. F.; Xu, Y.; Chen, J.; Zhang, T.; Zhang, A. L.; Guo, Z. Y.; Chen, J. E.

    2014-02-15

    Radiation is an important issue, which should be carefully treated during the design and commissioning of an ion source. Measurements show that X-rays are generated around the ceramics column of an extraction system when the source is powered up to 30 kV. The X-ray dose increases greatly when a beam is extracted. Inserting the ceramic column into a metal vacuum box is a good way to block X-ray emission for those cases. Moreover, this makes the online test of an intense H{sup +} ion beam with energy up to 100 keV possible. However, for deuteron ion source commissioning, neutron and gamma-ray radiation become a serious topic. In this paper, we will describe the design of the extraction system and the radiation doses of neutrons and gamma-rays measured at different D{sup +} beam energy during our 2.45 GHz deuteron electron cyclotron resonance ion source commissioning for PKUNIFTY (PeKing University Neutron Imaging FaciliTY) project at Peking University.

  11. DOE Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Plans DOE Plans DOE Strategic Plans Strategic Plan for the Department of Energy Environmental Restoration Strategic Plan (PDF) DOE Chief Information Officer Strategic Plan Chicago Strategic Plan (PDF)

  12. Energy Efficiency in Western Utility Resource Plans Implications for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regional Assessments and Initiatives | Department of Energy in Western Utility Resource Plans Implications for Regional Assessments and Initiatives Energy Efficiency in Western Utility Resource Plans Implications for Regional Assessments and Initiatives Project scope: Comparative analysis of recent resource plans filed by 14 utilities in the Western U.S. and Canada. Analyze treatment of conventional & emerging resource options-including energy efficiency (EE)-Assess risk analysis &

  13. Gulf of Mexico Regional Collaborative Final Report

    SciTech Connect (OSTI)

    Judd, Kathleen S.; Judd, Chaeli; Engel-Cox, Jill A.; Gulbransen, Thomas; Anderson, Michael G.; Woodruff, Dana L.; Thom, Ronald M.; Guzy, Michael; Hardin, Danny; Estes, Maury

    2007-12-01

    This report presents the results of the Gulf of Mexico Regional Collaborative (GoMRC), a year-long project funded by NASA. The GoMRC project was organized around end user outreach activities, a science applications team, and a team for information technology (IT) development. Key outcomes are summarized below for each of these areas. End User Outreach; Successfully engaged federal and state end users in project planning and feedback; With end user input, defined needs and system functional requirements; Conducted demonstration to End User Advisory Committee on July 9, 2007 and presented at Gulf of Mexico Alliance (GOMA) meeting of Habitat Identification committee; Conducted significant engagement of other end user groups, such as the National Estuary Programs (NEP), in the Fall of 2007; Established partnership with SERVIR and Harmful Algal Blooms Observing System (HABSOS) programs and initiated plan to extend HABs monitoring and prediction capabilities to the southern Gulf; Established a science and technology working group with Mexican institutions centered in the State of Veracruz. Key team members include the Federal Commission for the Protection Against Sanitary Risks (COFEPRIS), the Ecological Institute (INECOL) a unit of the National Council for science and technology (CONACYT), the Veracruz Aquarium (NOAA’s first international Coastal Ecology Learning Center) and the State of Veracruz. The Mexican Navy (critical to coastal studies in the Southern Gulf) and other national and regional entities have also been engaged; and Training on use of SERVIR portal planned for Fall 2007 in Veracruz, Mexico Science Applications; Worked with regional scientists to produce conceptual models of submerged aquatic vegetation (SAV) ecosystems; Built a logical framework and tool for ontological modeling of SAV and HABs; Created online guidance for SAV restoration planning; Created model runs which link potential future land use trends, runoff and SAV viability; Analyzed SAV

  14. Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 2

    SciTech Connect (OSTI)

    1988-01-01

    The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site; to describe the conceptual designs for the repository and the waste package and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. Chapter 3 summarizes present knowledge of the regional and site hydrologic systems. The purpose of the information presented is to (1) describe the hydrology based on available literature and preliminary site-exploration activities that have been or are being performed and (2) provide information to be used to develop the hydrologic aspects of the planned site characterization program. Chapter 4 contains geochemical information about the Yucca Mountain site. The chapter references plan for continued collection of geochemical data as a part of the site characterization program. Chapter 4 describes and evaluates data on the existing climate and site meterology, and outlines the suggested procedures to be used in developing and validating methods to predict future climatic variation. 534 refs., 100 figs., 72 tabs.

  15. Strategic Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Energy Planning Presentation Agenda * Strategic Energy Planning - Strategic Energy Planning (SEP) Workbook - What is it? - The process - The plan * Activity 2 1/28/2016 2 Strategic Energy Plan and Planning Handbook * Provides a step-by-step process that Tribes may wish to use as a road map for discussion and decisions related to strategic energy planning and energy project prioritization * Includes blank text boxes for communities to input their own information and outcomes from energy

  16. Project Reports for Navajo Hopi Land Commission Office (NHLCO): Navajo Hopi Land Commission Office (NHLCO)- 2012 Project

    Broader source: Energy.gov [DOE]

    The Navajo Hopi Land Commission (NHLCO), together with its partners, will conduct a feasibility study (FS) of a program to develop renewable energy on the Paragon-Bisti ranch lands in northwestern New Mexico, which were set aside under the Navajo-Hopi Land Settlement Act for the benefit of relocatees (defined as Navajo families living on Hopi Partitioned Lands as of December 22, 1974).

  17. Energy Efficiency in Western Utility Resource Plans: Impacts...

    Office of Scientific and Technical Information (OSTI)

    Energy Efficiency in Western Utility Resource Plans: Impacts onRegional Resources Assessment and Support for WGA Policies Citation Details In-Document Search Title: Energy ...

  18. Hanford Site Development Plan

    SciTech Connect (OSTI)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. ); Yancey, E.F. )

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  19. Strategies for automatic online treatment plan reoptimization using clinical treatment planning system: A planning parameters study

    SciTech Connect (OSTI)

    Li, Taoran; Wu, Qiuwen; Zhang, You; Vergalasova, Irina; Lee, W. Robert; Yin, Fang-Fang; Wu, Q. Jackie

    2013-11-15

    plan fluence map as the starting stage reduced OAR dose at the mid-dose region, but increased the monitor units by 17%. Differences of only 2cc or less in OAR V50%/V70Gy/V76Gy were observed between 100 and 50 iterations.Conclusions: It is feasible to perform automatic online reoptimization in ?2 min using a clinical treatment planning system. Selecting optimal sets of input parameters is the key to achieving high quality reoptimized plans, and should be based on the individual patient's daily anatomy, delivery efficiency, and time allowed for plan adaptation.

  20. Nuclear Navy United States Atomic Energy Commission Historical Advisory

    Energy Savers [EERE]

    Department of Energy In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station (13.36 KB) More Documents

  1. File:07-FD-a - PlantCommissioning.pdf | Open Energy Information

    Open Energy Info (EERE)

    7-FD-a - PlantCommissioning.pdf Jump to: navigation, search File File history File usage Metadata File:07-FD-a - PlantCommissioning.pdf Size of this preview: 463 599 pixels....

  2. Beam On Target! - CEBAF Accelerator Achieves 12 GeV Commissioning...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Beam On Target - CEBAF Accelerator Achieves 12 GeV Commissioning Milestone Beam On Target CEBAF Accelerator Achieves 12 GeV Commissioning Milestone The accelerator crew on hand ...

  3. Alaska - AS 42.05.431 - Power of Commission to Fix Rates | Open...

    Open Energy Info (EERE)

    - AS 42.05.431 - Power of Commission to Fix RatesLegal Abstract This section sets forth the authority of the Regulatory Commission to fix rates for service by utilities....

  4. Recovery Act-Funded 90-m Blade Test Facility Commissioned May...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act-Funded 90-m Blade Test Facility Commissioned May 18, 2011 Recovery Act-Funded 90-m Blade Test Facility Commissioned May 18, 2011 May 20, 2011 - 3:06pm Addthis This is ...

  5. Comments of the Staff of the public utilities commission of the...

    Office of Environmental Management (EM)

    commission of the state of California on the interim final rule Comments of the Staff of the public utilities commission of the state of California on the interim final rule The ...

  6. Commission to Review the Effectiveness of the National Energy Laboratories Inaugural Meeting

    Broader source: Energy.gov [DOE]

    10:30 – 10:45 AM Welcome and Introduction of the CommissionSecretary Ernest J. MonizCommission Co-chairs, T.J. Glauthier and Jared Cohon

  7. File:07UTCUtahPublicServiceCommissionProcess.pdf | Open Energy...

    Open Energy Info (EERE)

    UTCUtahPublicServiceCommissionProcess.pdf Jump to: navigation, search File File history File usage Metadata File:07UTCUtahPublicServiceCommissionProcess.pdf Size of this preview:...

  8. File:07CABPlantCommissioningProcessSmallPowerPlantExemption.pdf...

    Open Energy Info (EERE)

    7CABPlantCommissioningProcessSmallPowerPlantExemption.pdf Jump to: navigation, search File File history File usage Metadata File:07CABPlantCommissioningProcessSmallPowerPlantExempt...

  9. File:07ORBStatePlantCommissioningProcess (1).pdf | Open Energy...

    Open Energy Info (EERE)

    7ORBStatePlantCommissioningProcess (1).pdf Jump to: navigation, search File File history File usage Metadata File:07ORBStatePlantCommissioningProcess (1).pdf Size of this preview:...

  10. Poster Thur Eve 39: Feasibility of Commissioning HybridArc with the Delta 4 two plane diode phantom: comparisons with Gafchromic Film

    SciTech Connect (OSTI)

    Bojechko, C.; Ploquin, N.; Hudson, A.; Sayous, Y.

    2014-08-15

    HybridArc is a relatively novel radiation therapy technique which combines optimized dynamic conformai arcs (DCA) and intensity modulated radiation therapy (IMRT). HybridArc has possible dosimetry and efficiency advantages over stand alone DCA and IMRT treatments and can be readily implemented on any linac capable of DCA and IMRT, giving strong motivation to commission the modality. The Delta4 phantom (Scandidos, Uppsala, Sweden) has been used for IMRT and VMAT clinical dosimetric verification making it a candidate for HybridArc commissioning. However the HybridArc modality makes use of several non co-planar arcs which creates setup issues due to the geometry of the Delta4, resulting in possible phantom gantry collisions for plans with non-zero couch angles. An analysis was done determining the feasibility of using the Delta4 fixed at 0 couch angle compared with results obtained using Gafchromic ETB2 film (Ashland, Covington Kentucky) in an anthropomorphic phantom at the planned couch angles. A gamma index analysis of the measured and planned dose distributions was done using Delta4 and DoseLab Pro (Mobius Medical Systems, Houston Texas) software. For both arc and IMRT sub-fields there is reasonable correlation between the gamma index found from the Delta4 and Gafchromic film. All results show the feasibility of using the Delta4 for HybridArc commissioning.

  11. Environmental externalities: A survey of state commission actions

    SciTech Connect (OSTI)

    Cohen, S.D.; Eto, J.H. [National Association of Regulatory Utility Commissioners, Washington, DC (United States); Goldman, C.A. [Lawrence Berkeley Lab., CA (United States); Beldock, J. [USDOE Assistant Secretary for Conservation and Renewable Energy, Washington, DC (United States). Office of Buildings and Community Systems; Crandall, G. [MSB Associates, Middleton, WI (United States)

    1990-05-01

    Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC`s Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a ``snapshot`` of regulatory developments in an area that is evolving rapidly. 16 refs.

  12. Environmental externalities: A survey of state commission actions

    SciTech Connect (OSTI)

    Cohen, S.D.; Eto, J.H. (National Association of Regulatory Utility Commissioners, Washington, DC (United States)); Goldman, C.A. (Lawrence Berkeley Lab., CA (United States)); Beldock, J. (USDOE Assistant Secretary for Conservation and Renewable Energy, Washington, DC (United States). Office of Buildings and Community Systems); Crandall, G. (MSB Associates, Middleton, WI (United States))

    1990-05-01

    Awareness of the environmental consequences of electricity production have led many state public utility commissions (PUC) to consider these externalities formally in their regulation of utilities. At the request of NARUC's Energy Conservation staff subcommittee, the Lawrence Berkeley Laboratory conducted a survey to identify the extent and range of PUC approaches to this issue; responses were obtained from PUC staff in 49 states and the District of Columbia. The study should be viewed as providing a snapshot'' of regulatory developments in an area that is evolving rapidly. 16 refs.

  13. Nuclear Regulatory Commission issuances, Volume 46, No. 4

    SciTech Connect (OSTI)

    1997-10-01

    This report includes the issuances received in October 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. Five issuances were received on the following subjects: (1) decontamination and decommissioning funding for Sequoyah Fuels Corporation and General Atomics; (2) involvement in NRC-licensed activities by Aharon Ben-Haim; (3) Barnett Industrial X-Ray, Inc.; (4) spent fuel storage installation at Northern States Power Company; and (5) Vermont Yankee Nuclear Power Station. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  14. Commissioning and performance of the BNL EBIS LLRF system

    SciTech Connect (OSTI)

    Yuan, S.; Smith, K.S.; Hayes, T.; Severino, F.; Harvey, M.; Narayan, G.; Zaltsman, A.

    2011-03-28

    The Electron Beam Ion Source (EBIS) LLRF system utilizes the RHIC LLRF upgrade platform to achieve the required functionality and flexibility. The LLRF system provides drive to the EBIS high-level RF system, employs I-Q feedback to provide required amplitude and phase stability, and implements a cavity resonance control scheme. The embedded system provides the interface to the existing Controls System, making remote system control and diagnostics possible. The flexibility of the system allows us to reuse VHDL codes, develop new functionalities, improve current designs, and implement new features with relative ease. In this paper, we will discuss the commissioning process, issues encountered, and performance of the system.

  15. UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

    Broader source: Energy.gov (indexed) [DOE]

    ... Plains and Eastern also plan for the Project to include an intermediate converter station ... will safely and reliably interconnect to the 2 Application at 10. 3 Id. at 6-8. Docket No. ...

  16. Commission to Review the Effectiveness of the National Energy Laboratories, December 15, 2014

    Broader source: Energy.gov [DOE]

    This is the fifth meeting of the Commission to Review the Effectiveness of the National Energy Laboratories.

  17. US Nuclear Regulatory Commission functional organization charts, January 31, 1992. Revision 15

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Functional organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented in this document.

  18. U.S. Nuclear Regulatory Commission organization charts and functional statements. Revision 19

    SciTech Connect (OSTI)

    NONE

    1996-01-31

    Functional statements and organization charts for the US Nuclear Regulatory Commission offices, divisions, and branches are presented.

  19. Commission to Review the Effectiveness of the National Energy Laboratories, November 4, 2014

    Broader source: Energy.gov [DOE]

    This is the fourth meeting of the Commission to Review the Effectiveness of the National Energy Laboratories.

  20. Commission to Review the Effectiveness of the National Energy Laboratories, February 24, 2015

    Broader source: Energy.gov [DOE]

    This is the sixth meeting of the Commission to Review the Effectiveness of the National Energy Laboratories.