Powered by Deep Web Technologies
Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

3-appendix_b1- final.rev 1.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

B-1 B-1 Appendix B Assessment Results by State B-2 B-3 Appendix B Assessment Results by State This appendix contains the results of water energy resource assessments of the 50 states of the United States. The state results are presented in the two part table, Table B-0, to facilitate lookup of power potential values and comparison of these values amongst the states. This summary information is followed by 50 sections, each developed to a particular state. Each section has the same format, which includes the following tables and figures: * Table of total, developed, excluded, and available power potential by power class * Pie chart showing the developed, excluded, and available fractions of the total power potential * Pie chart showing the high power, high head/

2

Portsmouth DUF6 Conversion Final EIS - Chapter 7: References  

NLE Websites -- All DOE Office Websites (Extended Search)

Portsmouth DUF Portsmouth DUF 6 Conversion Final EIS 7 REFERENCES Acoustical Society of America, 1983, American National Standard Specification for Sound Level Meters, ANSI S1.4-1983, New York, N.Y., Feb. Acoustical Society of America, 1985, American National Standard Specification for Sound Level Meters, ANSI S1.4A-1985, Amendment to ANSI S1.4-1983, New York, N.Y., June. AIHA (American Industrial Hygiene Association), 2002, The AIHA 2002 Emergency Response Planning Guidelines and Workplace Environmental Exposure Level Guides Handbook, Fairfax, Va. Allison, T., 2002, "DUF 6 County, City, and School District Financial Data," intraoffice memorandum from Allison (Argonne National Laboratory, Argonne, Ill.) to H. Avci (Argonne National Laboratory, Argonne, Ill.), Aug. 1.

3

Paducah DUF6 Conversion Final EIS - Chapter 7: References  

NLE Websites -- All DOE Office Websites (Extended Search)

Paducah DUF Paducah DUF 6 Conversion Final EIS 7 REFERENCES Acoustical Society of America, 1983, American National Standard Specification for Sound Level Meters, ANSI S1.4-1983, New York, N.Y., Feb. Acoustical Society of America, 1985, American National Standard Specification for Sound Level Meters, ANSI S1.4A-1985, Amendment to ANSI S1.4-1983, New York, N.Y., June. AIHA (American Industrial Hygiene Association), 2002, The AIHA 2002 Emergency Response Planning Guidelines and Workplace Environmental Exposure Level Guides Handbook, Fairfax, Va. Allison, T., 2002, "DUF 6 County, City, and School District Financial Data," intraoffice memo from Allison (Argonne National Laboratory, Argonne, Ill.) to H. Avci (Argonne National Laboratory, Argonne, Ill.), Aug. 1.

4

References  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis Analysis Analysis - Home Analytical Dashboards Computerized Accident Incident Reporting and Recordkeeping System (CAIRS) Corporate Safety Analysis Trends Daily Occurrence Reports Electrical Safety Occurrences Final Occurrence Reports Access System Login Lessons Learned and Best Practices Occurrence Reporting and Processing System (ORPS) Operating Experience Committee Operating Experience Level 1, 2, and 3 Documents Operating Experience Summaries Radiation Exposure Monitoring Systems (REMS) Safety Bulletins Safety and Health Alerts Safety Basis Information System (SBIS) Suspect/Counterfeit Items and Defective Items (SCI/DI) References HSS Logo References DOE O 210.2A, DOE Corporate Operating Experience Program (Apr 08, 2011) DOE O 210.2 Crosswalk DOE O 231.1B, Environment, Safety and Health Reporting (Jun 27, 2011)

5

Shale oil production system reference case study. Final report  

DOE Green Energy (OSTI)

Material balances, utility balances, and overall processing schemes were developed for two reference shale oil production systems. For both cases, crushed and sized oil shale is fed into a mix of surface retorts specified for this study, which handle both coarse and fine ore. Case 1A produces an upgraded crude product suitable for refinery feedstock, and Case 1B produces a crude shale oil. The reference system uses room-and-pillar mining, three different types of retorts not unlike those proposed for the White River Shale Project on Federal Lease Tracts U-a and U-b, a straightforward upgrading of the raw shale oil to a refinery feedstock syncrude, and pipeline transportation of that product. In addition to the production of an upgraded product, there is also a modified system for producing raw shale oil that is minimally upgraded for pipeline transportation purposes. The capital cost estimate for the two reference cases has 26 cost elements, excluding, for example, any land or finance costs. A more complete list of excluded cost elements is provided in Section VII. The two distinct cases, production of raw and upgraded shale oil, were included to avoid foreclosing the issue of on- or off-site upgrading. The difference in estimated capital cost ($795M vs. $875M) amounts to about 10 percent.

Not Available

1979-06-01T23:59:59.000Z

6

REFERENCES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

205.1B 205.1B Approved 05-16-2011 Page 1 REFERENCES 1. INTRODUCTION 2. . Includes a list of sources cited in the directive and additional information sources to assist in implementing DOE Order 205.1B, Cyber Security Program. FEDERAL LAWS AND REGULATIONS a. Public Law (P.L.) 93-579, Privacy Act of 1974, as amended [Title 5 United States Code (U.S.C.) Section 552a]. . b. P.L. 104-106, Division E, Clinger Cohen Act (CCA) (formerly Information Technology Management Reform Act of 1996. c. P.L. 106-65, "National Defense Authorization Act [Section 3212(d)], enacted October 1999. d. P.L. 107-347, Title III, Federal Information Security Management Act of 2002 (FISMA), enacted December 2002. 3. OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULARS. Located at http://www.whitehouse.gov/omb/circulars_default/.

7

b1.xls  

U.S. Energy Information Administration (EIA) Indexed Site

Released: Dec 2006 Next CBECS will be conducted in 2007 Number of Buildings (thousand) Total Floorspace (million square feet) Total Workers in All Buildings (thousand) Mean Square Feet per Building (thousand) Mean Square Feet per Worker Mean Hours per Week All Buildings*................................... 4,645 64,783 72,807 13.9 890 61 Table B1. Summary Table: Total and Means of Floorspace, Number of Workers, and Hours of Operation for Non-Mall Buildings, 2003 Climate Zone: 30-Year Average Under 2,000 CDD and -- More than 7,000 HDD ..................... 855 10,622 10,305 12.4 1,031 60 5,500-7,000 HDD ............................ 1,173 17,335 17,340 14.8 1,000 63 4,000-5,499 HDD ............................ 673 11,504 14,007 17.1 821 66 Fewer than 4,000 HDD ................... 1,276

8

b1.xls  

U.S. Energy Information Administration (EIA) Indexed Site

1 1 Number of Buildings (thousand) Total Floorspace (million square feet) Total Workers in All Buildings (thousand) Mean Square Feet per Building (thousand) Mean Square Feet per Worker Mean Hours per Week All Buildings*................................... 4,645 64,783 72,807 13.9 890 61 Table B1. Summary Table: Total and Means of Floorspace, Number of Workers, and Hours of Operation for Non-Mall Buildings, 2003 Climate Zone: 30-Year Average Under 2,000 CDD and -- More than 7,000 HDD ..................... 855 10,622 10,305 12.4 1,031 60 5,500-7,000 HDD ............................ 1,173 17,335 17,340 14.8 1,000 63 4,000-5,499 HDD ............................ 673 11,504 14,007 17.1 821 66 Fewer than 4,000 HDD ................... 1,276 15,739 17,178 12.3 916 57 2,000 CDD or More and -- Fewer than 4,000 HDD ...................

9

Categorical Exclusion Determinations: B1.27 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Categorical Exclusion Determinations: B1.27 Existing Regulations B1.27: Disconnection of utilities Activities that are required for the disconnection of utility services (including, but not limited to, water, steam, telecommunications, and electrical power) after it has been determined that the continued operation of these systems is not needed for safety. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD May 17, 2013 CX-010416: Categorical Exclusion Determination Substation Maintenance and Renovation Activities CX(s) Applied: B1.3, B1.7, B1.11, B1.27, B1.31, B1.33, B2.2, B2.3, B2.5,

10

W. J. MILLER TO RALPH STEIN (REQUEST FOR REFERENCES FOR THE FINAL ENVIRONMENTAL ASSESSMENT (EA)  

E-Print Network (OSTI)

This letter is in response to the above NRC request for an early insight to the questions regarding the EA reference material. Information regarding additions since the draft was issued, and availability of both microfiche and hard copy, have been discussed with Mr. Paul Hildenbrand, NRC-BWIP Project Manager and are herein confirmed. 1. Two copies of the listing of references which denotes new or added reference material by aasterisk. 2. Two copies of the microfiche references- some 417 references to date are enclosed. Twenty seven (27) are still to be reproduced. A separate listing of the 27 is also enclosed. They will be forwarded to the NRC as soon as they are available. 3. We have initiated work on duplicating a hard copy per your request, but will not be completed with the task until approximately the end of May 1986. If the NRC could identify to our office select special needs, we could provide them, if not too extensive, in an earlier time

Mr. J. J. Linehan; Section Leader

1986-01-01T23:59:59.000Z

11

Categorical Exclusion Determinations: B1.11 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B1.11 B1.11 Categorical Exclusion Determinations: B1.11 Existing Regulations B1.11: Fencing Installation of fencing, including, but not limited to border marking, that would not have the potential to significantly impede wildlife population movement (including migration) or surface water flow. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD August 29, 2011 CX-006588: Categorical Exclusion Determination Routine Monitoring and Maintenance, Slick Rock, Colorado, Disposal/Processing Site CX(s) Applied: B1.3, B1.11, B3.8 Date: 08/29/2011

12

Test Reference Year (TRY). Final report. [Weather data collection for building energy demand calculations  

SciTech Connect

The Test Reference Year (TRY) for a specified location is a data collection consisting of 8760 sets of hourly weather data. Its main objective is to provide data for computerized calculations regarding energy conservation, energy consumption in buildings, and indoor climate. This report recommends a suitable format for such a TRY, describes which weather data are mandatory for such a TRY to meet the main objective, and recommends how it can be published. The report does not recommend any specific procedure for generating or selecting a TRY for a given location.

1977-08-01T23:59:59.000Z

13

Lower Columbia River and Estuary Ecosystem Restoration Program Reference Site Study: 2011 Restoration Analysis - FINAL REPORT  

SciTech Connect

The Reference Site (RS) study is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers, Portland District [USACE], and U.S. Bureau of Reclamation) in response to Federal Columbia River Power System (FCRPS) Biological Opinions (BiOp). While the RS study was initiated in 2007, data have been collected at relatively undisturbed reference wetland sites in the LCRE by PNNL and collaborators since 2005. These data on habitat structural metrics were previously summarized to provide baseline characterization of 51 wetlands throughout the estuarine and tidal freshwater portions of the 235-km LCRE; however, further analysis of these data has been limited. Therefore, in 2011, we conducted additional analyses of existing field data previously collected for the Columbia Estuary Ecosystem Restoration Program (CEERP) - including data collected by PNNL and others - to help inform the multi-agency restoration planning and ecosystem management work underway in the LCRE.

Borde, Amy B.; Cullinan, Valerie I.; Diefenderfer, Heida L.; Thom, Ronald M.; Kaufmann, Ronald M.; Zimmerman, Shon A.; Sagar, Jina; Buenau, Kate E.; Corbett, C.

2012-05-31T23:59:59.000Z

14

Hawaii demand-side management resource assessment. Final report, Reference Volume 1: Building prototype analysis  

Science Conference Proceedings (OSTI)

This report provides a detailed description of, and the baseline assumptions and simulation results for, the building prototype simulations conducted for the building types designated in the Work Plan for Demand-side Management Assessment of Hawaii`s Demand-Side Resources (HES-4, Phase 2). This report represents the second revision to the initial building prototype description report provided to DBEDT early in the project. Modifications and revisions to the prototypes, based on further calibration efforts and on comments received from DBEDT Staff have been incorporated into this final version. These baseline prototypes form the basis upon which the DSM measure impact estimates and the DSM measure data base were developed for this project. This report presents detailed information for each of the 17 different building prototypes developed for use with the DOE-21E program (23 buildings in total, including resorts and hotels defined separately for each island) to estimate the impact of the building technologies and measures included in this project. The remainder of this section presents some nomenclature and terminology utilized in the reports, tables, and data bases developed from this project to denote building type and vintage. Section 2 contains a more detailed discussion of the data sources, the definition of the residential sector building prototypes, and results of the DOE-2 analysis. Section 3 provides a similar discussion for the commercial sector. The prototype and baseline simulation results are presented in a separate section for each building type. Where possible, comparison of the baseline simulation results with benchmark data from the ENERGY 2020 model or other demand forecasting models specific to Hawaii is included for each building. Appendix A contains a detailed listing of the commercial sector baseline indoor lighting technologies included in the existing and new prototypes by building type.

NONE

1995-04-01T23:59:59.000Z

15

Categorical Exclusion Determinations: B1.1 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B1.1 B1.1 Categorical Exclusion Determinations: B1.1 Existing Regulations B1.1: Changing rates and prices Changing rates for services or prices for products marketed by parts of DOE other than Power Marketing Administrations, and approval of rate or price changes for non-DOE entities, that are consistent with the change in the implicit price deflator for the Gross Domestic Product published by the Department of Commerce, during the period since the last rate or price change. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD No downloads found for this office.

16

Categorical Exclusion Determinations: B1.24 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 23, 2011 November 23, 2011 CX-007786: Categorical Exclusion Determination American Electric Power Out Grant Permit (Final) CX(s) Applied: B1.24 Date: 11/23/2011 Location(s): Ohio Offices(s): Portsmouth Paducah Project Office September 29, 2011 CX-006907: Categorical Exclusion Determination Gas Chromatography-Mass Spectroscopy Operation Associated with the Novolyte Electrolyte Plant in Zachary, Louisiana CX(s) Applied: B1.24, B3.6 Date: 09/29/2011 Location(s): Independence, Ohio Office(s): Energy Efficiency and Renewable Energy July 21, 2011 CX-006311: Categorical Exclusion Determination Acquisition of Properties near the Naches River in Yakima County, Washington for Fish and Wildlife Habitat Mitigation CX(s) Applied: B1.24, B1.25 Date: 07/21/2011 Location(s): Yakima County, Washington

17

Categorical Exclusion Determinations: B1.19 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19 19 Categorical Exclusion Determinations: B1.19 Existing Regulations B1.19: Microwave, meteorological, and radio towers Siting, construction, modification, operation, and removal of microwave, radio communication, and meteorological towers and associated facilities, provided that the towers and associated facilities would not be in a governmentally designated scenic area (see B(4)(iv) of this appendix) unless otherwise authorized by the appropriate governmental entity. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD July 3, 2013

18

Categorical Exclusion Determinations: B1.19 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19 19 Categorical Exclusion Determinations: B1.19 Existing Regulations B1.19: Microwave, meteorological, and radio towers Siting, construction, modification, operation, and removal of microwave, radio communication, and meteorological towers and associated facilities, provided that the towers and associated facilities would not be in a governmentally designated scenic area (see B(4)(iv) of this appendix) unless otherwise authorized by the appropriate governmental entity. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD February 15, 2011

19

Categorical Exclusion Determinations: B1.2 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determinations: B1.2 Existing Regulations B1.2: Training exercises and simulations Training exercises and simulations (including, but not limited to, firing-range training, small-scale and short-duration force-on-force exercises, emergency response training, fire fighter and rescue training, and decontamination and spill cleanup training) conducted under appropriately controlled conditions and in accordance with applicable requirements. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD August 16, 2013

20

Categorical Exclusion Determinations: B1.10  

Energy.gov (U.S. Department of Energy (DOE))

B1.10: Onsite storage of activated materialRoutine, onsite storage at an existing facility of activated equipment and material (including, but not limited to, lead) used at that facility, to allow...

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Categorical Exclusion Determinations: B1.11  

Energy.gov (U.S. Department of Energy (DOE))

B1.11: FencingInstallation of fencing, including, but not limited to border marking, that would not have the potential to significantly impede wildlife population movement (including migration) or...

22

The results of the PEP`93 intercomparison of reference cell calibrations and newer technology performance measurements: Final report  

DOE Green Energy (OSTI)

This report presents the results of an international intercomparison of photovoltaic (PV) performance measurements and calibrations that took place from 1993 to 1997. The intercomparison, which was organized and operated by a group of representatives from national PV measurements laboratories, was accomplished by circulating two sample sets. One set, consisting of 20 silicon reference cells, was intended to form the basis of an international PV reference scale. A qualification procedure applied to the calibration results gave average calibration numbers with an overall standard deviation of less than 2% for the entire set. The second sample set was assembled from a wide range of newer technologies that present unique problems for PV measurements. As might be expected, these results showed much greater differences among the laboratories. Methods were then identified that should be used to measure such devices, along with problems to avoid. The report concludes with recommendations for future intercomparisons.

Osterwald, C.R. [National Renewable Energy Lab., Golden, CO (United States); Anevsky, S. [All-Union Research Inst. for Optophysical Measurements, Moscow (Russian Federation); Barua, A.K. [Indian Association for the Cultivation of Science, Calcutta (India)] [and others

1998-03-01T23:59:59.000Z

23

Categorical Exclusion Determinations: B1.36 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Categorical Exclusion Determinations: B1.36 Existing Regulations B1.36: Determinations of excess real property Determinations that real property is excess to the needs of DOE and, in the case of acquired real property, the subsequent reporting of such determinations to the General Services Administration or, in the case of lands withdrawn or otherwise reserved from the public domain, the subsequent filing of a notice of intent to relinquish with the Bureau of Land Management, Department of the Interior. Covered actions would not include disposal of real property. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this

24

Categorical Exclusion Determinations: B1.16 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Categorical Exclusion Determinations: B1.16 Existing Regulations B1.16: Asbestos removal Removal of asbestos-containing materials from buildings in accordance with applicable requirements (such as 40 CFR part 61, "National Emission Standards for Hazardous Air Pollutants"; 40 CFR part 763, "Asbestos"; 29 CFR part 1910, subpart I, "Personal Protective Equipment"; and 29 CFR part 1926, "Safety and Health Regulations for Construction"; and appropriate state and local requirements, including certification of removal contractors and technicians). Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this

25

Categorical Exclusion Determinations: B1.34 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Categorical Exclusion Determinations: B1.34 Existing Regulations B1.34: Lead-based paint containment, removal, and disposal Containment, removal, and disposal of lead-based paint in accordance with applicable requirements (such as provisions relating to the certification of removal contractors and technicians at 40 CFR part 745, "Lead-Based Paint Poisoning Prevention In Certain Residential Structures"). Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD January 9, 2013 CX-009806: Categorical Exclusion Determination

26

Categorical Exclusion Determinations: B1.28 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Categorical Exclusion Determinations: B1.28 Existing Regulations B1.28: Placing a facility in an environmentally safe condition Minor activities that are required to place a facility in an environmentally safe condition where there is no proposed use for the facility. These activities would include, but are not limited to, reducing surface contamination, and removing materials, equipment or waste (such as final defueling of a reactor, where there are adequate existing facilities for the treatment, storage, or disposal of the materials, equipment or waste). These activities would not include conditioning, treatment, or processing of spent nuclear fuel, high-level waste, or special nuclear materials. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were

27

Categorical Exclusion Determinations: B1.13 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Categorical Exclusion Determinations: B1.13 Existing Regulations B1.13: Pathways, short access roads, and rail lines Construction, acquisition, and relocation, consistent with applicable right-of-way conditions and approved land use or transportation improvement plans, of pedestrian walkways and trails, bicycle paths, small outdoor fitness areas, and short access roads and rail lines (such as branch and spur lines). Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD July 25, 2013 CX-010604: Categorical Exclusion Determination

28

Categorical Exclusion Determinations: B1.27 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Categorical Exclusion Determinations: B1.27 Existing Regulations B1.27: Disconnection of utilities Activities that are required for the disconnection of utility services (including, but not limited to, water, steam, telecommunications, and electrical power) after it has been determined that the continued operation of these systems is not needed for safety. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD February 8, 2010 CX-000787: Categorical Exclusion Determination Generic Categorical Exclusion for Site-Wide Miscellaneous Installation and

29

Categorical Exclusion Determinations: B1.17 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Categorical Exclusion Determinations: B1.17 Existing Regulations B1.17: Polychlorinated biphenyl removal Removal of polychlorinated biphenyl (PCB)-containing items (including, but not limited to, transformers and capacitors), PCB-containing oils flushed from transformers, PCB-flushing solutions, and PCB-containing spill materials from buildings or other aboveground locations in accordance with applicable requirements (such as 40 CFR part 761). Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD January 9, 2013 CX-009806: Categorical Exclusion Determination

30

Categorical Exclusion Determinations: B1.23 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Categorical Exclusion Determinations: B1.23 Existing Regulations B1.23: Demolition and disposal of buildings Demolition and subsequent disposal of buildings, equipment, and support structures (including, but not limited to, smoke stacks and parking lot surfaces), provided that there would be no potential for release of substances at a level, or in a form, that could pose a threat to public health or the environment. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD September 17, 2013 CX-010953: Categorical Exclusion Determination

31

Categorical Exclusion Determinations: B1.30 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Categorical Exclusion Determinations: B1.30 Existing Regulations B1.30: Transfer actions Transfer actions, in which the predominant activity is transportation, provided that (1) the receipt and storage capacity and management capability for the amount and type of materials, equipment, or waste to be moved already exists at the receiving site and (2) all necessary facilities and operations at the receiving site are already permitted, licensed, or approved, as appropriate. Such transfers are not regularly scheduled as part of ongoing routine operations. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this

32

Categorical Exclusion Determinations: B1.33 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Categorical Exclusion Determinations: B1.33 Existing Regulations B1.33: Stormwater runoff control Design, construction, and operation of control practices to reduce stormwater runoff and maintain natural hydrology. Activities include, but are not limited to, those that reduce impervious surfaces (such as vegetative practices and use of porous pavements), best management practices (such as silt fences, straw wattles, and fiber rolls), and use of green infrastructure or other low impact development practices (such as cisterns and green roofs). Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this

33

Categorical Exclusion Determinations: B1.32 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Categorical Exclusion Determinations: B1.32 Existing Regulations B1.32: Traffic flow adjustments Traffic flow adjustments to existing roads (including, but not limited to, stop sign or traffic light installation, adjusting direction of traffic flow, and adding turning lanes), and road adjustments (including, but not limited to, widening and realignment) that are within an existing right-of-way and consistent with approved land use or transportation improvement plans. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD September 16, 2013

34

Categorical Exclusion Determinations: B1.25 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Categorical Exclusion Determinations: B1.25 Existing Regulations B1.25: Real property transfers for cultural resources protection, habitat preservation, and wildlife management Transfer, lease, disposition, or acquisition of interests in land and associated buildings for cultural resources protection, habitat preservation, or fish and wildlife management, provided that there would be no potential for release of substances at a level, or in a form, that could pose a threat to public health or the environment. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

35

Categorical Exclusion Determinations: B1.9 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Categorical Exclusion Determinations: B1.9 Existing Regulations B1.9: Airway safety markings and painting Placement of airway safety markings on, painting of, and repair and in-kind replacement of lighting on powerlines and antenna structures, wind turbines, and similar structures in accordance with applicable requirements (such as Federal Aviation Administration standards). Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD January 7, 2011 CX-007164: Categorical Exclusion Determination Prescott-Pinnacle Peak & Pinnacle Peak-Rogers Aerial Marker Ball Addition

36

Categorical Exclusion Determinations: B1.20 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Categorical Exclusion Determinations: B1.20 Existing Regulations B1.20: Protection of cultural resources, fish and wildlife habitat Small-scale activities undertaken to protect cultural resources (such as fencing, labeling, and flagging) or to protect, restore, or improve fish and wildlife habitat, fish passage facilities (such as fish ladders and minor diversion channels), or fisheries. Such activities would be conducted in accordance with an existing natural or cultural resource plan, if any. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD

37

Categorical Exclusion Determinations: B1.28 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Categorical Exclusion Determinations: B1.28 Existing Regulations B1.28: Placing a facility in an environmentally safe condition Minor activities that are required to place a facility in an environmentally safe condition where there is no proposed use for the facility. These activities would include, but are not limited to, reducing surface contamination, and removing materials, equipment or waste (such as final defueling of a reactor, where there are adequate existing facilities for the treatment, storage, or disposal of the materials, equipment or waste). These activities would not include conditioning, treatment, or processing of spent nuclear fuel, high-level waste, or special nuclear materials. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were

38

Categorical Exclusion Determinations: B1.12 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Categorical Exclusion Determinations: B1.12 Existing Regulations B1.12: Detonation or burning of explosives or propellants after testing Outdoor detonation or burning of explosives or propellants that failed (duds), were damaged (such as by fracturing), or were otherwise not consumed in testing. Outdoor detonation or burning would be in areas designated and routinely used for those purposes under existing applicable permits issued by Federal, state, and local authorities (such as a permit for a RCRA miscellaneous unit (40 CFR part 264, subpart X)). Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this

39

FINAL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 FINAL ENVIRONMENTAL ASSESSMENT FOR EXIDE TECHNOLOGIES ELECTRIC DRIVE VEHICLE BATTERY AND COMPONENT MANUFACTURING INITIATIVE APPLICATION, BRISTOL, TN, AND COLUMBUS, GA U.S. Department of Energy National Energy Technology Laboratory March 2010 DOE/EA-1712 FINAL ENVIRONMENTAL ASSESSMENT FOR EXIDE TECHNOLOGIES ELECTRIC DRIVE VEHICLE BATTERY AND COMPONENT MANUFACTURING INITIATIVE APPLICATION, BRISTOL, TN, AND COLUMBUS, GA U.S. Department of Energy National Energy Technology Laboratory March 2010 DOE/EA-1712 iii COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Environmental Assessment for Exide Technologies Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, Bristol, TN, and Columbus, GA

40

Categorical Exclusion Determinations: B1.5 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B1.5 Categorical Exclusion Determinations: B1.5 Existing Regulations B1.5: Existing steam plants and cooling water systems Minor improvements to existing steam plants and...

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Final  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, , Final for Vegetation Control at VHF Stations, Microwave Stations, Electrical Substations, and Pole Yards . Environmental Assessment Prepared for Southwestern Power Administration U.S. Department of Energy - _ . . . " Prepared by Black & Veatch October 13,1995 ' Table of Contents 1 . 0 Purpose and Need for Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.0 Description of the Alternatives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.1 Alternative 1 . No Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2 Alternative 2 . Mechanical and Manual Control . . . . . . . . . . . . . . . . . . . 2.3 Alternative 3 . Proposed Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.1 Foliar Spray Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.2 Soil-Spot Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

42

B1. Summary Statistics for Natural  

Gasoline and Diesel Fuel Update (EIA)

B1. B1. Summary Statistics for Natural Gas in the United States, Metric Equivalents, 1992-1996 Table 1992 1993 1994 1995 1996 Reserves (billion cubic meters) Estimated Proved Reserves (dry) as of December 31 ....................................... 4,673 4,599 4,639 4,676 4,714 Number of Gas and Gas Condensate Wells Producing at End of Year.............................. 275,414 282,152 291,773 298,541 301,811 Production (million cubic meters) Gross Withdrawals From Gas Wells ......................................... 457,738 472,640 491,327 489,373 500,664 From Oil Wells ........................................... 168,977 170,878 176,404 182,972 180,403 Total.............................................................. 626,716 643,519 667,731 672,345 681,067 Repressuring ................................................ -84,173

43

Categorical Exclusion Determinations: B1.18 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Categorical Exclusion Determinations: B1.18 Existing Regulations B1.18: Water supply wells Siting, construction, and operation of additional water supply wells (or replacement...

44

Categorical Exclusion Determinations: B1.14 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determinations: B1.14 Existing Regulations B1.14: Refueling of nuclear reactors Refueling of operating nuclear reactors, during which operations may be...

45

Categorical Exclusion Determinations: B1.31 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 17, 2009 November 17, 2009 CX-000312: Categorical Exclusion Determination New Jersey Revision 1 - Grants for Energy Efficiency, Renewable Energy and Alternative Energy Applications CX(s) Applied: A1, A9, A11, B1.3, B1.4, B1.5, B1.7, B1.15, B1.22, B1.23, B1.24, B1.31, B2.1, B2.2, B2.5, B4.4, B5.1 Date: 11/17/2009 Location(s): New Jersey Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory November 17, 2009 CX-000315: Categorical Exclusion Determination New Jersey Revision 1 - Multifamily Energy Efficiency Improvement Pilot (MEEIP) CX(s) Applied: A1, A9, A11, B1.3, B1.4, B1.5, B1.7, B1.15, B1.23, B1.24, B1.31, B2.1, B2.2, B2.5, B5.1 Date: 11/17/2009 Location(s): New Jersey Office(s): Energy Efficiency and Renewable Energy, National Energy

46

Categorical Exclusion Determinations: B1.5 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 6, 2009 November 6, 2009 CX-000298: Categorical Exclusion Determination Maryland Revision 1 - EmPOWERing Financing Initiative CX(s) Applied: A1, A7, A9, A11, B1.3, B1.4, B1.5, B1.15, B1.22, B1.24, B1.31, B2.1, B2.2, B2.5, B5.1 Date: 11/06/2009 Location(s): Maryland Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory November 6, 2009 CX-000296: Categorical Exclusion Determination Maryland Revision 1 - Clean Energy Grant Programs CX(s) Applied: B1.3, B1.5, B1.15, B1.31, B2.5, B5.1 Date: 11/06/2009 Location(s): Maryland Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory November 6, 2009 CX-000295: Categorical Exclusion Determination Commercial/Industrial Loans and Grants CX(s) Applied: B1.15, B1.22, B1.24, B1.31, B2.1, B2.2, B2.5, A1, B1.3,

47

Categorical Exclusion Determinations: B1.24 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 23, 2009 November 23, 2009 CX-000321: Categorical Exclusion Determination Kentucky Revision 2 - Green and Healthy Schools Program (GHS) CX(s) Applied: A1, A9, A11, B1.3, B1.4, B1.5, B1.7, B1.15, B1.24, B1.31, B2.1, B2.3, B2.5, B5.1 Date: 11/23/2009 Location(s): Kentucky Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory November 23, 2009 CX-000320: Categorical Exclusion Determination Kentucky Revision 2 - Kentucky Farm Energy Efficiency and Renewable Energy Partnership CX(s) Applied: A1, A9, A11, B1.3, B1.4, B1.5, B1.7, B1.15, B1.22, B1.24, B1.31, B2.1, B2.2, B2.5, B5.1, B5.12 Date: 11/23/2009 Location(s): Kentucky Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory November 19, 2009 CX-000318: Categorical Exclusion Determination

48

Categorical Exclusion Determinations: B1.22 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22 22 Categorical Exclusion Determinations: B1.22 Existing Regulations B1.22: Relocation of buildings Relocation of buildings (including, but not limited to, trailers and prefabricated buildings) to an already developed area (where active utilities and currently used roads are readily accessible). DOCUMENTS AVAILABLE FOR DOWNLOAD November 23, 2009 CX-000322: Categorical Exclusion Determination Kentucky Revision 2 - Green Bank of Kentucky Date: 11/23/2009 Location(s): Kentucky Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory November 23, 2009 CX-000320: Categorical Exclusion Determination Kentucky Revision 2 - Kentucky Farm Energy Efficiency and Renewable Energy Partnership CX(s) Applied: A1, A9, A11, B1.3, B1.4, B1.5, B1.7, B1.15, B1.22, B1.24,

49

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 17, 2009 November 17, 2009 CX-000315: Categorical Exclusion Determination New Jersey Revision 1 - Multifamily Energy Efficiency Improvement Pilot (MEEIP) CX(s) Applied: A1, A9, A11, B1.3, B1.4, B1.5, B1.7, B1.15, B1.23, B1.24, B1.31, B2.1, B2.2, B2.5, B5.1 Date: 11/17/2009 Location(s): New Jersey Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory November 17, 2009 CX-000314: Categorical Exclusion Determination New Jersey Revision 1 - Low-Interest Loan Program for Residential Energy Efficiency CX(s) Applied: B1.24, B1.31, B2.1, B2.2, B2.3, B2.5, A1, A9, B1.3, B1.4, B1.5, B1.7, B5.1 Date: 11/17/2009 Location(s): New Jersey Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory November 17, 2009 CX-000313: Categorical Exclusion Determination

50

Categorical Exclusion Determinations: B1.7 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 21, 2012 September 21, 2012 CX-009238: Categorical Exclusion Determination Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site CX(s) Applied: B1.3, B1.4, B1.7, B1.13, B1.15, B1.16, B1.23, B1.24, B1.28, B2.1, B2.2, B2.4, B2.5, B3.1, B5.16, B6.1 Date: 09/21/2012 Location(s): Grand Junction Offices(s): Legacy Management September 13, 2012 CX-009389: Categorical Exclusion Determination Security Camera Installation CX(s) Applied: A11, B1.7, B1.15, B2.2, B2.3 Date: 09/13/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory September 13, 2012 CX-009384: Categorical Exclusion Determination Morgantown Parking Garage Fire Alarm System CX(s) Applied: B1.3, B1.7, B1.15, B2.5 Date: 09/13/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory

51

Categorical Exclusion Determinations: B1.7 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 23, 2009 November 23, 2009 CX-000322: Categorical Exclusion Determination Kentucky Revision 2 - Green Bank of Kentucky Date: 11/23/2009 Location(s): Kentucky Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory November 23, 2009 CX-000321: Categorical Exclusion Determination Kentucky Revision 2 - Green and Healthy Schools Program (GHS) CX(s) Applied: A1, A9, A11, B1.3, B1.4, B1.5, B1.7, B1.15, B1.24, B1.31, B2.1, B2.3, B2.5, B5.1 Date: 11/23/2009 Location(s): Kentucky Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory November 23, 2009 CX-000320: Categorical Exclusion Determination Kentucky Revision 2 - Kentucky Farm Energy Efficiency and Renewable Energy Partnership CX(s) Applied: A1, A9, A11, B1.3, B1.4, B1.5, B1.7, B1.15, B1.22, B1.24,

52

Los Alamos Waste Management Cost Estimation Model; Final report: Documentation of waste management process, development of Cost Estimation Model, and model reference manual  

Science Conference Proceedings (OSTI)

This final report completes the Los Alamos Waste Management Cost Estimation Project, and includes the documentation of the waste management processes at Los Alamos National Laboratory (LANL) for hazardous, mixed, low-level radioactive solid and transuranic waste, development of the cost estimation model and a user reference manual. The ultimate goal of this effort was to develop an estimate of the life cycle costs for the aforementioned waste types. The Cost Estimation Model is a tool that can be used to calculate the costs of waste management at LANL for the aforementioned waste types, under several different scenarios. Each waste category at LANL is managed in a separate fashion, according to Department of Energy requirements and state and federal regulations. The cost of the waste management process for each waste category has not previously been well documented. In particular, the costs associated with the handling, treatment and storage of the waste have not been well understood. It is anticipated that greater knowledge of these costs will encourage waste generators at the Laboratory to apply waste minimization techniques to current operations. Expected benefits of waste minimization are a reduction in waste volume, decrease in liability and lower waste management costs.

Matysiak, L.M.; Burns, M.L.

1994-03-01T23:59:59.000Z

53

Some Practical Notes on the Parameter kB?1 for Sparse Vegetation  

Science Conference Proceedings (OSTI)

This paper deals with the parameter kB?1, the logarithm of the ratio between momentum and heat roughness length, of sparsely vegetated surfaces and bare soil. The bare soil surface is included as a reference, since it is fairly homogenous and ...

A. Verhoef; H. A. R. De Bruin; B. J. J. M. Van Den Hurk

1997-05-01T23:59:59.000Z

54

Categorical Exclusion Determinations: B1.15 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 10, 2010 February 10, 2010 CX-000988: Categorical Exclusion Determination Green Energy Works! - Combined Heat and Power - Geisinger Medical Center CX(s) Applied: A9, A11, B1.15, B1.24, B5.1 Date: 02/10/2010 Location(s): Danville, Pennsylvania Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory February 8, 2010 CX-000787: Categorical Exclusion Determination Generic Categorical Exclusion for Site-Wide Miscellaneous Installation and Maintenance Activities CX(s) Applied: B1.3, B1.4, B1.5, B1.9, B1.11, B1.15, B1.16, B1.17, B1.22, B1.27, B1.31, B2.1, B2.2, B2.3, B2.5 Date: 02/08/2010 Location(s): Illinois Office(s): Science, Argonne Site Office February 8, 2010 CX-000989: Categorical Exclusion Determination East Pennsboro Wastewater Treatment Plant Biogas Recovery and Utilization

55

Data:866dbe0a-3582-49b1-9968-47249db8e115 | Open Energy Information  

Open Energy Info (EERE)

dbe0a-3582-49b1-9968-47249db8e115 dbe0a-3582-49b1-9968-47249db8e115 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Sauk Centre, Minnesota (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Commercial service - dual fuel rate Sector: Commercial Description: Closed to New Accounts. Energy adjustment base average = $0.054/kwh (E.A. base would vary each month based on projected power costs.) Source or reference: http://www.saukcentre.govoffice2.com/vertical/sites/%7BD28FAE32-EDE3-421C-BD2D-FA8E76EA5F8C%7D/uploads/Operational_Policy_Rate_Schedule_2012_final.pdf

56

Categorical Exclusion Determinations: B1.8 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Categorical Exclusion Determinations: B1.8 Existing Regulations B1.8: Screened water intake and outflow structures Modifications to screened water intake and outflow structures such that intake velocities and volumes and water effluent quality and volumes are consistent with existing permit limits. DOCUMENTS AVAILABLE FOR DOWNLOAD November 8, 2012 CX-009551: Categorical Exclusion Determination Brigham City Hydro Generation Project CX(s) Applied: B1.8, B5.2 Date: 11/08/2012 Location(s): Utah Offices(s): Golden Field Office July 16, 2012 CX-009099: Categorical Exclusion Determination Routine Maintenance CX(s) Applied: B1.3, B1.4, B1.8, B1.16, B1.17 Date: 07/16/2012 Location(s): Washington Offices(s): Pacific Northwest Site Office December 13, 2010 CX-004840: Categorical Exclusion Determination

57

Categorical Exclusion Determinations: B1.31 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Applied: B1.15, B1.31, A9 Date: 06092010 Location(s): Warwick, Rhode Island Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory June 2,...

58

Categorical Exclusion Determinations: B1.4 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 4, 2009 December 4, 2009 CX-000332: Categorical Exclusion Determination Kentucky Revision 2 - Industrial Facility Retrofit Showcase CX(s) Applied: B1.4, B1.15, B1.22, B1.23, B1.24, B1.31, B2.1, B2.2, B2.5, B5.1 Date: 12/04/2009 Location(s): Kentucky Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 3, 2009 CX-000331: Categorical Exclusion Determination Kentucky Revision 2 - Commercial Office Building Retrofit Showcase CX(s) Applied: B1.4, B1.5, B1.15, B1.23, B1.24, B1.31, B2.1, B2.2, B2.5, B5.1 Date: 12/03/2009 Location(s): Lexington, Kentucky Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory November 30, 2009 CX-000329: Categorical Exclusion Determination Allison Hybrid Assembly, Test, and Development; Activities at 2

59

US008389715B1 (12) United States Patent (10) Patent No.: US 8,389,715 B1  

E-Print Network (OSTI)

8,389,715 B1 HQ. 3 #12;US. Patent Mar. 5, 2013 Sheet 4 of8 US 8,389,715 B1 x8624: SQ #12;US. Patent Mar. 5,2013 Sheet 5 of8 US 8,389,715 B1 HQ. 5 #12;US. Patent Mar. 5, 2013 Sheet 6 of8 US 8,389,715 B1 The present invention relates to self-assembly of organic molecules and, more particularly, to self

Shelnutt, John A.

60

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 3, 2011 August 3, 2011 CX-006486: Categorical Exclusion Determination B-Press and Extruder Modification CX(s) Applied: A7, B1.3, B1.15, B1.16, B1.27, B1.31 Date: 08/03/2011 Location(s): Amarillo, Texas Office(s): Pantex Site Office August 3, 2011 CX-006452: Categorical Exclusion Determination Building 4 Mezzanine Renovation CX(s) Applied: B1.3, B2.3 Date: 08/03/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory August 2, 2011 CX-006632: Categorical Exclusion Determination 773-A, C-001 Roof Replacement Date: 08/02/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 26, 2011 CX-006624: Categorical Exclusion Determination Pole Inspections For C- Area - By Sub-Contractor (L) CX(s) Applied: B1.3

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Categorical Exclusion Determinations: B1.31 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 5, 2010 January 5, 2010 CX-000698: Categorical Exclusion Determination Connecticut - State Building Energy Improvements: 79 Elm Street CX(s) Applied: B1.3, B1.4, B1.24, B1.31, B2.5, B5.1 Date: 01/05/2010 Location(s): Hartford, Connecticut Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 30, 2009 CX-000694: Categorical Exclusion Determination Pennsylvania - Economic Development Authority Sustainable Business Recovery: Expansion of Landfill Gas-to-Energy Facility (Southeastern Chester County Refuse Authority) CX(s) Applied: B1.15, B1.24, B1.31, B5.1 Date: 12/30/2009 Location(s): Chester County, Pennsylvania Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 30, 2009 CX-000693: Categorical Exclusion Determination

62

Categorical Exclusion Determinations: B1.15 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 6, 2009 November 6, 2009 CX-000301: Categorical Exclusion Determination Maryland Revision 1 - Grants to Promote Mid-size Renewables at Private & Government Buildings CX(s) Applied: A7, B1.3, B1.4, B1.15, B1.22, B1.24, B1.31, B2.2, B2.5, B5.1 Date: 11/06/2009 Location(s): Maryland Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory November 6, 2009 CX-000299: Categorical Exclusion Determination Maryland Revision 1 - Alternative Transportation Fuel and Infrastructure Grants CX(s) Applied: A1, A9, A11, B1.15, B1.22, B1.24, B1.31, B2.5, B5.1 Date: 11/06/2009 Location(s): Maryland Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory November 6, 2009 CX-000298: Categorical Exclusion Determination Maryland Revision 1 - EmPOWERing Financing Initiative

63

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 13, 2011 December 13, 2011 CX-007437: Categorical Exclusion Determination Routine Site Activities at the Shoal, Nevada, Site CX(s) Applied: B1.3, B3.1 Date: 12/13/2011 Location(s): Nevada Offices(s): Legacy Management December 13, 2011 CX-007443: Categorical Exclusion Determination Routine Site Activities at the Shirley Basin South, Wyoming, Disposal Site CX(s) Applied: B1.3, B1.11, B1.20, B3.1 Date: 12/13/2011 Location(s): Wyoming Offices(s): Legacy Management December 13, 2011 CX-007442: Categorical Exclusion Determination Routine Maintenance Activities at the Grand Junction, Colorado, Calibration Model Facility CX(s) Applied: B1.3, B1.24 Date: 12/13/2011 Location(s): Colorado Offices(s): Legacy Management December 5, 2011 CX-007511: Categorical Exclusion Determination Record of Categorical Exclusion for Repair Erosion Problems at Big Hill Raw

64

Categorical Exclusion Determinations: B1.4 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Categorical Exclusion Determinations: B1.4 Existing Regulations B1.4: Air conditioning systems for existing equipment Installation or modification of air conditioning systems required for temperature control for operation of existing equipment. DOCUMENTS AVAILABLE FOR DOWNLOAD May 5, 2013 CX-010293: Categorical Exclusion Determination 2013 B17 Renovation CX(s) Applied: B1.4, B1.15, B1.31, B2.1 Date: 05/03/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory April 16, 2013 CX-010193: Categorical Exclusion Determination B-4 Rooms 110, 111, and 112 Roof Top Heating, Ventilation, and Air Conditioning Unit Replacement CX(s) Applied: B1.4, B2.1, B2.2, B2.5 Date: 04/16/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory

65

Categorical Exclusion Determinations: B1.24 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 22, 2010 April 22, 2010 CX-001670: Categorical Exclusion Determination Compressed Natural Gas Fueling Infrastructure Program (Florida) CX(s) Applied: B1.24, B1.31, B2.5, A11, B5.1 Date: 04/22/2010 Location(s): Florida Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory March 31, 2010 CX-001455: Categorical Exclusion Determination State Building Energy Improvements - Hammonassett State Park CX(s) Applied: B1.24, B1.31, B2.5, B5.1 Date: 03/31/2010 Location(s): Madison, Connecticut Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory March 31, 2010 CX-001454: Categorical Exclusion Determination State Building Energy Improvements - State Office Building CX(s) Applied: B1.24, B1.31, B2.5, B5.1 Date: 03/31/2010

66

Categorical Exclusion Determinations: B1.15 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 14, 2009 December 14, 2009 CX-000686: Categorical Exclusion Determination Pennsylvania - Energy Harvest Mined Grants - Crawford Central School District CX(s) Applied: B1.15, B1.24, B1.31, B2.5, B5.1 Date: 12/14/2009 Location(s): Crawford, Pennsylvania Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 14, 2009 CX-000684: Categorical Exclusion Determination Pennsylvania - Energy Harvest Mined Grants - Somerset City Conservation District CX(s) Applied: B1.15, B1.24, B1.31, B5.1 Date: 12/14/2009 Location(s): Somerset, Pennsylvania Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 4, 2009 CX-000332: Categorical Exclusion Determination Kentucky Revision 2 - Industrial Facility Retrofit Showcase

67

Categorical Exclusion Determinations: B1.22 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Categorical Exclusion Determinations: B1.22 Existing Regulations B1.22: Relocation of buildings Relocation of buildings (including, but not limited to, trailers and prefabricated buildings) to an already developed area (where active utilities and currently used roads are readily accessible). DOCUMENTS AVAILABLE FOR DOWNLOAD August 1, 2013 CX-010837: Categorical Exclusion Determination Disassembly, Relocation, and Reassembly of a Metal-framed Quonset Hut CX(s) Applied: B1.22 Date: 08/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 20, 2013 CX-010418: Categorical Exclusion Determination Eastern Colorado Field Office Com Buildings Removal CX(s) Applied: B1.22, B1.23, B1.24 Date: 05/20/2013 Location(s): Colorado, Wyoming, Wyoming

68

Categorical Exclusion Determinations: B1.15 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 1, 2010 September 1, 2010 CX-003683: Categorical Exclusion Determination Motor Excellence - eBike Motors CX(s) Applied: B1.15, B1.31, B5.1 Date: 09/01/2010 Location(s): Flagstaff, Arizona Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 30, 2010 CX-003523: Categorical Exclusion Determination Small Wind Turbine Regional Test Center Kansas State University; National Renewable Energy Laboratory Tracking Number 10-029 CX(s) Applied: A9, A11, B1.15, B3.1, B5.1 Date: 08/30/2010 Location(s): Colby, Kansas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 24, 2010 CX-003623: Categorical Exclusion Determination Routine Grounds and Maintenance Activities CX(s) Applied: B1.3, B1.11, B1.15 Date: 08/24/2010 Location(s): Illinois

69

Categorical Exclusion Determinations: B1.23 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 3, 2012 May 3, 2012 CX-008345: Categorical Exclusion Determination Remove Abandoned Bayou Choctaw Timber Bridge Over North/South Canal CX(s) Applied: B1.23 Date: 05/03/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office April 24, 2012 CX-008179: Categorical Exclusion Determination Building 09-056 Demolition CX(s) Applied: B1.23 Date: 04/24/2012 Location(s): Texas Offices(s): Pantex Site Office April 20, 2012 CX-008339: Categorical Exclusion Determination Prototype Staff Building 114 CX(s) Applied: B1.15, B1.16, B1.23 Date: 04/20/2012 Location(s): New York Offices(s): Naval Nuclear Propulsion Program April 20, 2012 CX-008338: Categorical Exclusion Determination Security Upgrades Major Construction Project CX(s) Applied: B1.11, B1.15, B1.16, B1.23, B2.2

70

References - CECM  

E-Print Network (OSTI)

help · annotate · Contents Next: About this document Up: RamanujanModular Equations, Previous: Sources · [Annotate] · [Shownotes]. References.

71

Categorical Exclusion Determinations: B1.15 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 8, 2013 January 8, 2013 CX-009862: Categorical Exclusion Determination Building 4 Drain Line Replacement CX(s) Applied: B1.3, B1.15, B1.31 Date: 01/08/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory December 14, 2012 CX-009690: Categorical Exclusion Determination Washington River Protection Solutions LLC - Support Buildings CX(s) Applied: B1.15 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 12, 2012 CX-009717: Categorical Exclusion Determination Pumping System for 100 MBD Cavern Capacity Maintenance CX(s) Applied: B1.15 Date: 12/12/2012 Location(s): Texas, Louisiana, Texas Offices(s): Strategic Petroleum Reserve Field Office December 5, 2012 CX-009666: Categorical Exclusion Determination

72

Categorical Exclusion Determinations: B1.23 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 17, 2012 September 17, 2012 CX-009371: Categorical Exclusion Determination Audio/Video Technology Refresh: PGH/MGN CX(s) Applied: B1.15, B1.23, B2.2 Date: 09/17/2012 Location(s): West Virginia, Pennsylvania Offices(s): National Energy Technology Laboratory September 17, 2012 CX-009173: Categorical Exclusion Determination Kansas-City-Olathe CX(s) Applied: A9, A11, B1.23, B5.1, B5.23 Date: 09/17/2012 Location(s): Kansas Offices(s): Energy Efficiency and Renewable Energy September 12, 2012 CX-009263: Categorical Exclusion Determination Design for High Performance Sustainable Building Modifications Based on E4 Report - PGH CX(s) Applied: B1.15, B1.23, B2.2 Date: 09/12/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory September 12, 2012 CX-009262: Categorical Exclusion Determination

73

Categorical Exclusion Determinations: B1.7 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 4, 2010 November 4, 2010 CX-004397: Categorical Exclusion Determination The Padlock Project CX(s) Applied: A1, A9, A11, B1.2, B1.7 Date: 11/04/2010 Location(s): Pullman, Washington Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory November 1, 2010 CX-004311: Categorical Exclusion Determination Commercial Renewable Energy Systems - Young Men's Christian Association of Western North Carolina, Rueter Family Branch Solar Thermal CX(s) Applied: A9, B1.5, B1.7, B1.31, B5.1 Date: 11/01/2010 Location(s): Asheville, North Carolina Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory November 1, 2010 CX-004309: Categorical Exclusion Determination Commercial Renewable Energy Systems - Law Offices of Wallace and Graham

74

Categorical Exclusion Determinations: B1.15 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 19, 2012 April 19, 2012 CX-008341: Categorical Exclusion Determination A-6 Office Building CX(s) Applied: B1.15 Date: 04/19/2012 Location(s): Pennsylvania Offices(s): Naval Nuclear Propulsion Program April 6, 2012 CX-008183: Categorical Exclusion Determination Science and User Support Building CX(s) Applied: B1.15, B1.23 Date: 04/06/2012 Location(s): California Offices(s): Stanford Linear Accelerator Site Office March 28, 2012 CX-008182: Categorical Exclusion Determination Project S-234, Patrol Training Academy Firing Range Realignment CX(s) Applied: B1.15 Date: 03/28/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office February 24, 2012 CX-007921: Categorical Exclusion Determination Darlington County Biodiesel Buses CX(s) Applied: A1, B1.15, B2.2, B5.22

75

Categorical Exclusion Determinations: B1.24 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 8, 2012 August 8, 2012 CX-008881: Categorical Exclusion Determination Disposition of Mountain Avenue Tap Line Sectionalizing Switches CX(s) Applied: B1.24 Date: 08/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration August 8, 2012 CX-008961: Categorical Exclusion Determination Pittsburgh Guard Shack Replacement CX(s) Applied: B1.23, B1.24 Date: 08/08/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory July 18, 2012 CX-009092: Categorical Exclusion Determination Project 1769 - Relocate NC-135 Site Operations CX(s) Applied: B1.24, B1.31 Date: 07/18/2012 Location(s): Missouri Offices(s): Kansas City Site Office July 13, 2012 CX-008762: Categorical Exclusion Determination Acid Pond Property Disposition Near the Spook, Wyoming, Disposal Site

76

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 5, 2012 November 5, 2012 CX-009422: Categorical Exclusion Determination Central Training Facility and Office of Secure Transportation Fence Line Maintenance CX(s) Applied: B1.3, B1.11 Date: 11/05/2012 Location(s): Tennessee Offices(s): Oak Ridge Office November 2, 2012 CX-009399: Categorical Exclusion Determination Install 200 Kilowatt Solar Photovoltaic System and Routine Maintenance Actions CX(s) Applied: B1.3, B1.19, B5.16 Date: 11/02/2012 Location(s): Arizona Offices(s): Legacy Management October 29, 2012 CX-009530: Categorical Exclusion Determination Artesia-Rangely Tap of the Hayden-Vernal 138 Kilovolt Transmission Line Bank Stabilization on Structure 20/2 CX(s) Applied: B1.3 Date: 10/29/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

77

Categorical Exclusion Determinations: B1.16 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 20, 2011 June 20, 2011 CX-006087: Categorical Exclusion Determination Removal of Asbestos from Buildings CX(s) Applied: B1.16 Date: 06/20/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office April 12, 2011 CX-005607: Categorical Exclusion Determination Building 7 Roof Replacement Project CX(s) Applied: B1.3, B1.16 Date: 04/12/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory April 12, 2011 CX-005703: Categorical Exclusion Determination Connecticut-City-Hamden, Town of CX(s) Applied: A1, A9, A11, B1.16, B1.32, B2.5, B5.1, B6.1 Date: 04/12/2011 Location(s): Hamden, Connecticut Office(s): Energy Efficiency and Renewable Energy April 8, 2011 CX-005551: Categorical Exclusion Determination

78

Categorical Exclusion Determinations: B1.24 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 18, 2010 January 18, 2010 CX-000706: Categorical Exclusion Determination Florida - Compressed Natural Gas Fleet Fueling - State Energy Program CX(s) Applied: B1.15, B1.24, B1.31, B2.5, B5.1 Date: 01/18/2010 Location(s): Florida Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory January 18, 2010 CX-000707: Categorical Exclusion Determination Florida - Clean Fuel LLC (Shovel Ready Grant project) State Energy Program CX(s) Applied: B1.24, B1.31, B2.2, B2.5, B5.1 Date: 01/18/2010 Location(s): Lakeland, Florida Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory January 15, 2010 CX-000704: Categorical Exclusion Determination Electric Drive Semiconductor Manufacturing Center - Advanced Battery Program

79

Categorical Exclusion Determinations: B1.15 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 24, 2011 August 24, 2011 CX-006627: Categorical Exclusion Determination Elverta Maintenance Facility Remodel CX(s) Applied: B1.4, B1.15, B2.1, B2.3, B2.5 Date: 08/24/2011 Location(s): Sacramento County, California Office(s): Western Area Power Administration-Sierra Nevada Region August 22, 2011 CX-006543: Categorical Exclusion Determination Building 40 New Video Surveillance CX(s) Applied: A11, B1.15, B2.3 Date: 08/22/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory August 19, 2011 CX-006545: Categorical Exclusion Determination Fiber Optic Service Expansion: Building 59 to Building 84 CX(s) Applied: B1.3, B1.15 Date: 08/19/2011 Location(s): Pittsburgh, Pennsylvania Office(s): Fossil Energy, National Energy Technology Laboratory

80

Reference Tools  

NLE Websites -- All DOE Office Websites (Extended Search)

Reference Tools Current Greenhouse Gas Concentrations Name that compound: The numbers game for CFCs, HFCs, HCFCs, and Halons Conversion Tables and More Glossary Acronyms CDIAC's...

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Categorical Exclusion Determinations: B1.31 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 1, 2010 June 1, 2010 CX-002455: Categorical Exclusion Determination Funk Linko Inc. CX(s) Applied: B1.31, B5.1 Date: 06/01/2010 Location(s): Wheeling, Illinois Office(s): Energy Efficiency and Renewable Energy, Golden Field Office June 1, 2010 CX-002509: Categorical Exclusion Determination Energy Retrofits for State Correctional Facilities CX(s) Applied: B1.23, B1.24, B1.28, B1.31, B2.2, A9, A11, B1.7, B5.1 Date: 06/01/2010 Location(s): Alabama Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory June 1, 2010 CX-002507: Categorical Exclusion Determination Solid State Batteries for Grid-Scale Energy Storage CX(s) Applied: B1.31, B3.6, A1, A9, B5.1 Date: 06/01/2010 Location(s): Berkeley, California Office(s): Electricity Delivery and Energy Reliability, National Energy

82

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 16, 2012 July 16, 2012 CX-009099: Categorical Exclusion Determination Routine Maintenance CX(s) Applied: B1.3, B1.4, B1.8, B1.16, B1.17 Date: 07/16/2012 Location(s): Washington Offices(s): Pacific Northwest Site Office July 16, 2012 CX-008505: Categorical Exclusion Determination Midwest Regional Carbon Sequestration Partnership - Phase Three CX(s) Applied: B3.1, B5.3, B1.3 Date: 07/16/2012 Location(s): Michigan Offices(s): National Energy Technology Laboratory July 11, 2012 CX-009079: Categorical Exclusion Determination Tie pH Adjustment System to 901-F Service Water System CX(s) Applied: B1.3 Date: 07/11/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 11, 2012 CX-009078: Categorical Exclusion Determination Dismantle and removal (D&R) of Domestic Water (DW) & Process Water (PWS)

83

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 16, 2012 April 16, 2012 CX-008348: Categorical Exclusion Determination Replace Big Hill Raw Water Intake System Oil Water Separator Tank with Concrete Tank CX(s) Applied: B1.3 Date: 04/16/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office April 16, 2012 CX-008176: Categorical Exclusion Determination Routine Activities at Lakeview, Oregon, Processing and Disposal Sites CX(s) Applied: B1.3, B1.11, B3.1 Date: 04/16/2012 Location(s): Oregon Offices(s): Legacy Management April 13, 2012 CX-008396: Categorical Exclusion Determination Danger Tree Management on Shiprock-Four Corners 345 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 04/13/2012 Location(s): New Mexico Offices(s): Western Area Power Administration-Rocky Mountain Region April 13, 2012

84

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 7, 2010 April 7, 2010 CX-001433: Categorical Exclusion Determination Site Perimeter Fencing Project CX(s) Applied: B1.3 Date: 04/07/2010 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory April 7, 2010 CX-001518: Categorical Exclusion Determination Re-seal Polyurethane Overcoat on BH Substation Relay Building 814 CX(s) Applied: B1.3 Date: 04/07/2010 Location(s): Texas Office(s): Fossil Energy, Strategic Petroleum Reserve Field Office March 31, 2010 CX-001386: Categorical Exclusion Determination Dragoon Creek Access to Bonneville Power Administration's Bell-Boundary #3 Transmission Line to Replace Existing Bridge CX(s) Applied: B1.13, B1.3 Date: 03/31/2010 Location(s): Spokane County, Washington Office(s): Bonneville Power Administration

85

Categorical Exclusion Determinations: B1.4 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 14, 2010 June 14, 2010 CX-002878: Categorical Exclusion Determination Replacement of K Area Complex (KAC) Chillers CX(s) Applied: B2.1, B1.4 Date: 06/14/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 27, 2010 CX-003142: Categorical Exclusion Determination Advanced Biofuels Process Development Unit for Lawrence Berkeley National Laboratory CX(s) Applied: A7, B1.3, B1.4, B2.1, B2.2, B2.3, B3.6 Date: 05/27/2010 Location(s): Emeryville, California Office(s): Science, Berkeley Site Office May 17, 2010 CX-002425: Categorical Exclusion Determination Municipal Building Energy Efficiency Retrofits CX(s) Applied: B2.5, B1.4, B5.1 Date: 05/17/2010 Location(s): Attleboro, Massachusetts Office(s): Energy Efficiency and Renewable Energy

86

Categorical Exclusion Determinations: B1.31 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 19, 2010 February 19, 2010 CX-000976: Categorical Exclusion Determination Town of Christiansburg Wastewater Treatment Plant Combined Heat and Power from Biogas CX(s) Applied: B1.15, B1.31, B5.1 Date: 02/19/2010 Location(s): Christiansburg, Virginia Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory February 19, 2010 CX-000974: Categorical Exclusion Determination King George Greenhouse Heat Capture CX(s) Applied: B1.31, B5.1 Date: 02/19/2010 Location(s): King George's County, Virginia Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory February 19, 2010 CX-000973: Categorical Exclusion Determination Environmental Solutions, Inc. Wood Pellet Mill Expansion CX(s) Applied: B1.31, B5.1 Date: 02/19/2010

87

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 28, 2010 April 28, 2010 CX-002550: Categorical Exclusion Determination Bubbler Upgrade Support - Defense Waste Processing Facility Dry Frit Addition CX(s) Applied: B1.3 Date: 04/28/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 28, 2010 CX-002547: Categorical Exclusion Determination Bubbler Upgrade Support - Defense Waste Processing Facility Water Separation from Decon Frit Solution CX(s) Applied: B1.3 Date: 04/28/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 27, 2010 CX-002236: Categorical Exclusion Determination C-Farm Electrical, Lighting, and Walkway Upgrades CX(s) Applied: B1.13, B2.1, B1.3 Date: 04/27/2010 Location(s): Richland, Washington

88

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2010 7, 2010 CX-001433: Categorical Exclusion Determination Site Perimeter Fencing Project CX(s) Applied: B1.3 Date: 04/07/2010 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory April 7, 2010 CX-001518: Categorical Exclusion Determination Re-seal Polyurethane Overcoat on BH Substation Relay Building 814 CX(s) Applied: B1.3 Date: 04/07/2010 Location(s): Texas Office(s): Fossil Energy, Strategic Petroleum Reserve Field Office March 31, 2010 CX-001386: Categorical Exclusion Determination Dragoon Creek Access to Bonneville Power Administration's Bell-Boundary #3 Transmission Line to Replace Existing Bridge CX(s) Applied: B1.13, B1.3 Date: 03/31/2010 Location(s): Spokane County, Washington Office(s): Bonneville Power Administration

89

Categorical Exclusion Determinations: B1.31 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29, 2011 29, 2011 CX-007516: Categorical Exclusion Determination Parts Washer Project CX(s) Applied: B1.23, B1.31 Date: 11/29/2011 Location(s): Tennessee Offices(s): Y-12 Site Office September 8, 2011 CX-006741: Categorical Exclusion Determination Information Technology Hub Relocation CX(s) Applied: B1.31 Date: 09/08/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory September 6, 2011 CX-006488: Categorical Exclusion Determination Chrysler Group LLC, Revised Specific Project Application 2, Retooling, Reequipping and Engineering CX(s) Applied: B1.31, B5.1 Date: 09/06/2011 Location(s): Auburn Hills, Michigan Office(s): Advanced Technology Vehicles Manufacturing Loan Program, Loan Guarantee Program Office August 29, 2011

90

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 24, 2010 August 24, 2010 CX-003594: Categorical Exclusion Determination Replace Bayou Choctaw Timber Pile Pipe Supports CX(s) Applied: B1.3 Date: 08/24/2010 Location(s): Bayou Choctaw, Louisiana Office(s): Fossil Energy, Strategic Petroleum Reserve Field Office August 24, 2010 CX-003571: Categorical Exclusion Determination Building 84 Gas Alarm Installation CX(s) Applied: A12, B1.3, B2.3 Date: 08/24/2010 Location(s): Pittsburgh, Pennsylvania Office(s): Fossil Energy, National Energy Technology Laboratory August 23, 2010 CX-004031: Categorical Exclusion Determination Energy Efficiency and Conservation Strategy and Motor Upgrades for Sewer and Water Pumps CX(s) Applied: A9, A11, B1.2, B1.3, B2.5, B5.1 Date: 08/23/2010 Location(s): Amherst, Massachusetts Office(s): Energy Efficiency and Renewable Energy

91

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 24, 2011 August 24, 2011 CX-006776: Categorical Exclusion Determination Hills Creek-Lookout Point #1 Wood Pole and Access Road Maintenance CX(s) Applied: B1.3 Date: 08/24/2011 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration August 24, 2011 CX-006591: Categorical Exclusion Determination Invasive Species Removal and Reclamation in Gold Eagle Mining, Incorporated CX(s) Applied: B1.3, B1.20 Date: 08/24/2011 Location(s): San Miguel County, Colorado Office(s): Legacy Management August 23, 2011 CX-007072: Categorical Exclusion Determination Install and Operate Chromate Water (CRW) Deionizer CX(s) Applied: B1.3 Date: 08/23/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management August 22, 2011 CX-006583: Categorical Exclusion Determination

92

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 20, 2013 June 20, 2013 CX-010655: Categorical Exclusion Determination Roof Repair on Crane Maintenance Area Roof CX(s) Applied: B1.3 Date: 06/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 18, 2013 CX-010656: Categorical Exclusion Determination Stormwater Drainage Repair CX(s) Applied: B1.3 Date: 06/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 17, 2013 CX-010662: Categorical Exclusion Determination Reroute Diesel Water Cooling Line at 241-125H CX(s) Applied: B1.3 Date: 06/17/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 17, 2013 CX-010661: Categorical Exclusion Determination Repair Roof at 717-K CX(s) Applied: B1.3 Date: 06/17/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

93

Categorical Exclusion Determinations: B1.32 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Renewable Energy July 28, 2010 CX-003188: Categorical Exclusion Determination Seminole Nation of Oklahoma CX(s) Applied: A1, A9, A11, B1.32, B5.1 Date: 07282010...

94

Categorical Exclusion Determinations: B1.4 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 6, 2009 CX-000297: Categorical Exclusion Determination Maryland Revision 1 - Multi-Family Housing Retrofits for Low and Moderate Income Families CX(s) Applied: A7, B1.3,...

95

Categorical Exclusion Determinations: B1.7 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 18, 2010 CX-002294: Categorical Exclusion Determination Enhanced Distribution and Demand Management Regional Demonstration CX(s) Applied: B3.6, A1, A9, A11, B1.7, B5.1 Date:...

96

Categorical Exclusion Determinations: B1.24 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Renewable Energy Program - Malone Middle School Wood Pellet CX(s) Applied: A9, B1.24, B2.2, B5.1 Date: 08122010 Location(s): Malone, New...

97

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B1.27, 62.1, B2.2, B2.3, 62.5 Date: 06082012 Location(s): Illinois Offices(s): New Brunswick Laboratory June 7, 2012 CX-008763: Categorical Exclusion Determination Building...

98

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 24, 2011 June 24, 2011 CX-006223: Categorical Exclusion Determination Routine and Proposed Actions at the New and Old Rifle, Colorado, Former Processing Sites and at the Rifle, Colorado, Disposal Site LM 22-11 CX(s) Applied: B1.3, B1.24, B3.1, B3.6 Date: 06/24/2011 Location(s): Rifle, Colorado Office(s): Legacy Management June 24, 2011 CX-006222: Categorical Exclusion Determination Non Comprehensive Environmental Response, Compensation, and Liability Act Permit Related, General Site Actions, and Non-Routine Actions at the Rocky Flats Site, Colorado, LM 18 - 11 CX(s) Applied: B1.3, B1.11, B1.12, B1.24, B3.3 Date: 06/24/2011 Location(s): Jefferson County, Colorado Office(s): Legacy Management June 24, 2011 CX-006221: Categorical Exclusion Determination Routine Monitoring, Maintenance, the Installation of Two Wells and General

99

Reference Shelf  

NLE Websites -- All DOE Office Websites (Extended Search)

Reference Shelf Reference Shelf Reference Shelf Find reference sources Questions? 505-667-5809 Email Biography Biographies of Women in Science Biography.com Marquis Who's Who NobelPrize.org Nobel Prize Internet Archive Calculators Currency Converter OnlineConversion.com Wolfram|Alpha Computational Knowledge Engine Dictionaries Oxford English Dictionary Merriam-Webster Dictionary DOD Dictionary of Military Terms Encyclopedias Britannica Online Columbia Encyclopedia Wikipedia Grants & Funding DOE Office of Science Grants & Contracts National Science Foundation National Institutes of Health Grants.Gov FedBizOpps.gov Los Alamos Info Los Alamos County Los Alamos Historical Society University of New Mexico - Los Alamos Campus Maps Atlapedia Online Perry-Casteneda Library Map Collection U.S. Gazetteer

100

Portsmouth DUF6 Conversion Final EIS - Volume 2: Comment and Response Document: Chapters 3 and 4: Response to Documents and References  

NLE Websites -- All DOE Office Websites (Extended Search)

Portsmouth DUF Portsmouth DUF 6 Conversion Final EIS 3 RESPONSES TO COMMENTS This section provides DOE's responses to comments received during the public comment period. Indices of the DOE responses are provided by document number (Table 3.1), by commentors' last name (Table 3.2), and by commentors' company/organization (Table 3.3). Most of the comments received apply to both the Portsmouth and the Paducah conversion facility EISs. However, there are some comment documents that apply specifically to one EIS or the other. An index of comment documents indicating their applicability to each EIS is given in Table 3.4. Table 3.5 lists only those comment documents that apply to the Portsmouth EIS, and Table 3.6 lists those comment documents that apply to the Paducah EIS. Table 3.7 lists the

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Paducah DUF6 Conversion Final EIS - Volume 2: Comment and Response Document: Chapters 3 and 4: Responses to Comments and References  

NLE Websites -- All DOE Office Websites (Extended Search)

Paducah DUF Paducah DUF 6 Conversion Final EIS 3 RESPONSES TO COMMENTS This section provides DOE's responses to comments received during the public comment period. Indices of the DOE responses are provided by document number (Table 3.1), by commentors' last name (Table 3.2), and by commentors' company/organization (Table 3.3). Most of the comments received apply to both the Portsmouth and the Paducah conversion facility EISs. However, there are some comment documents that apply specifically to one EIS or the other. An index of comment documents indicating their applicability to each EIS is given in Table 3.4. Table 3.5 lists only those comment documents that apply to the Portsmouth EIS, and Table 3.6 lists those comment documents that apply to the Paducah EIS. Table 3.7 lists the

102

Categorical Exclusion Determinations: B1.13 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21, 2010 21, 2010 CX-002690: Categorical Exclusion Determination Pajarito Road Right-Of-Way Shift at TA-50 and TA-55 CX(s) Applied: B1.13 Date: 04/21/2010 Location(s): New Mexico Office(s): Los Alamos Site Office April 2, 2010 CX-006727: Categorical Exclusion Determination Weirbox Installation CX(s) Applied: B1.6, B1.13, B2.5, B3.1, B5.4, B6.3 Date: 04/02/2010 Location(s): Casper, Wyoming Office(s): RMOTC March 31, 2010 CX-001386: Categorical Exclusion Determination Dragoon Creek Access to Bonneville Power Administration's Bell-Boundary #3 Transmission Line to Replace Existing Bridge CX(s) Applied: B1.13, B1.3 Date: 03/31/2010 Location(s): Spokane County, Washington Office(s): Bonneville Power Administration March 24, 2010 CX-001206: Categorical Exclusion Determination Tehachapi Wind Energy Storage

103

Categorical Exclusion Determinations: B1.15 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 16, 2012 July 16, 2012 CX-008511: Categorical Exclusion Determination Building 1 Renovation CX(s) Applied: B1.15, B1.16, B2.1, B2.2, B2.5 Date: 07/16/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory July 12, 2012 CX-008585: Categorical Exclusion Determination Solar TAC - Thermal Energy Storage Test Facility CX(s) Applied: A9, A11, B1.15, B3.6 Date: 07/12/2012 Location(s): Colorado Offices(s): Golden Field Office June 26, 2012 CX-008617: Categorical Exclusion Determination Savannah River National Laboratory Building 735-13A Power Addition CX(s) Applied: B1.15 Date: 06/26/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 21, 2012 CX-008695: Categorical Exclusion Determination Munro Control Center Expansion CX(s) Applied: B1.15

104

Categorical Exclusion Determinations: B1.31 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 22, 2012 August 22, 2012 CX-009017: Categorical Exclusion Determination Clemson University 15 Megawatt Hardware-In-the-Loop (HIL) Grid Simulator CX(s) Applied: A9, B1.31 Date: 08/22/2012 Location(s): South Carolina Offices(s): Golden Field Office August 13, 2012 CX-009008: Categorical Exclusion Determination Recovery Act State Energy Program Award for the State of Ohio - Revolving Loan Fund CX(s) Applied: A9, A11, B1.31, B1.32, B1.35, B2.1, B2.2, B5.1, B5.14, B5.16, B5.17, B5.18, B5.19 Date: 08/13/2012 Location(s): Ohio Offices(s): Golden Field Office July 26, 2012 CX-008866: Categorical Exclusion Determination Install Power Metering for Strategic Petroleum Reserve Site Buildings CX(s) Applied: B1.31 Date: 07/26/2012 Location(s): Louisiana, Texas, Texas, Louisiana Offices(s): Strategic Petroleum Reserve Field Office

105

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 20, 2012 December 20, 2012 CX-009527: Categorical Exclusion Determination WVDP-2012-02 Routine Maintenance CX(s) Applied: B1.3 Date: 12/20/2012 Location(s): New York Offices(s): West Valley Demonstration Project December 19, 2012 CX-009590: Categorical Exclusion Determination 723-A Distribution Panel 4 (DB4) Replacement CX(s) Applied: B1.3 Date: 12/19/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office December 19, 2012 CX-009745: Categorical Exclusion Determination Demonstrate Use of Various Distributed Energy Resources to Reduce Peak Load on Selected Feeders CX(s) Applied: A1, B1.3, B1.7, B1.31, B2.2, B4.4, B4.13, B5.1, B4.8 Date: 12/19/2012 Location(s): Colorado Offices(s): National Energy Technology Laboratory December 19, 2012 CX-009703: Categorical Exclusion Determination

106

Categorical Exclusion Determinations: B1.7 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 11, 2011 April 11, 2011 CX-005598: Categorical Exclusion Determination Demonstration of a Novel Synchrophasor-Based Situational Awareness System CX(s) Applied: A1, A11, B1.7, B3.6 Date: 04/11/2011 Location(s): Chattanooga, Tennessee Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory April 4, 2011 CX-005579: Categorical Exclusion Determination Albion Butte Radio Station Communication Upgrade CX(s) Applied: B1.7 Date: 04/04/2011 Location(s): Nibbs Creek, Idaho Office(s): Bonneville Power Administration March 23, 2011 CX-005449: Categorical Exclusion Determination State Energy Program American Recovery and Reinvestment Act Greenwood Scaling Biomass Boilers - Washington CX(s) Applied: A9, B1.7, B5.1 Date: 03/23/2011 Location(s): Washington

107

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 22, 2011 February 22, 2011 CX-005371: Categorical Exclusion Determination West Hackberry Off-Site Services Contract, 2011-2013 CX(s) Applied: B1.3 Date: 02/22/2011 Location(s): West Hackberry, Texas Office(s): Strategic Petroleum Reserve Field Office February 22, 2011 CX-005370: Categorical Exclusion Determination Clean and Inspect West Hackberry (WHT-14) Brine Tank CX(s) Applied: B1.3 Date: 02/22/2011 Location(s): West Hackberry, Louisiana Office(s): Strategic Petroleum Reserve Field Office February 22, 2011 CX-005369: Categorical Exclusion Determination Replacement of Big Hill Deep Anode Ground Bed Site for Cavern 103 CX(s) Applied: B1.3 Date: 02/22/2011 Location(s): Texas Office(s): Strategic Petroleum Reserve Field Office February 10, 2011 CX-005510: Categorical Exclusion Determination

108

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 24, 2011 May 24, 2011 CX-006398: Categorical Exclusion Determination Sidewalk Installation at 623-34G CX(s) Applied: B1.3 Date: 05/24/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 20, 2011 CX-005965: Categorical Exclusion Determination Alvey District Wood Poles: Eugene-Lane Number 1, Eugene-Alvey Number 2, and Hawkins-Alvey Number 1 CX(s) Applied: B1.3 Date: 05/20/2011 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration May 19, 2011 CX-006404: Categorical Exclusion Determination Install a Pressure Regulator and Relief Valve on the Tank 26 Flush Water Piping CX(s) Applied: B1.3 Date: 05/19/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

109

Categorical Exclusion Determinations: B1.15 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 17, 2010 May 17, 2010 CX-002311: Categorical Exclusion Determination Northern Michigan University's Electrical Power Technician Workforce Training Program CX(s) Applied: B1.15, B3.6, A9, A11 Date: 05/17/2010 Location(s): Marquette, Michigan Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory May 17, 2010 CX-002300: Categorical Exclusion Determination Competitive Renewable Grants Program - Renewable Water Resources Biogas CX(s) Applied: B1.15, B1.31, A9, B5.1 Date: 05/17/2010 Location(s): Greenville, South Carolina Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory May 13, 2010 CX-002360: Categorical Exclusion Determination Installing an Ammunition Storage Building and a Training Tower at the

110

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 28, 2011 September 28, 2011 CX-006955: Categorical Exclusion Determination Repair Radiological Fixative Coatings in F Tank Farm CX(s) Applied: B1.3 Date: 09/28/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Sandia Site Office September 28, 2011 CX-006952: Categorical Exclusion Determination Install Two New Steam Line Poles to Replace Poles # K164 and K165 in 105-K Area CX(s) Applied: B1.3 Date: 09/28/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Sandia Site Office September 22, 2011 CX-006884: Categorical Exclusion Determination Replace Big Hill Raw Water Intake Structure Screen Wash Piping CX(s) Applied: B1.3 Date: 09/22/2011 Location(s): Big Hill, Texas Office(s): Strategic Petroleum Reserve Field Office, Sandia Site Office

111

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 10, 2012 September 10, 2012 CX-009272: Categorical Exclusion Determination Building 94 Facade Restoration CX(s) Applied: B1.3 Date: 09/10/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory September 7, 2012 CX-009273: Categorical Exclusion Determination Building 25 Air Handlers Replacement CX(s) Applied: B1.3 Date: 09/07/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory September 4, 2012 CX-009226: Categorical Exclusion Determination CH2MHill Plateau Remediation Company - Routine Maintenance and Custodial Services CX(s) Applied: B1.3 Date: 09/04/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office August 30, 2012 CX-009103: Categorical Exclusion Determination Place Rock Around Storm Water Drop Point to Help Prevent Debris from

112

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 20, 2011 May 20, 2011 CX-005965: Categorical Exclusion Determination Alvey District Wood Poles: Eugene-Lane Number 1, Eugene-Alvey Number 2, and Hawkins-Alvey Number 1 CX(s) Applied: B1.3 Date: 05/20/2011 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration May 19, 2011 CX-006404: Categorical Exclusion Determination Install a Pressure Regulator and Relief Valve on the Tank 26 Flush Water Piping CX(s) Applied: B1.3 Date: 05/19/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 19, 2011 CX-006403: Categorical Exclusion Determination Enhanced Low Activity Waste Disposal Premix Silo Area Modifications CX(s) Applied: B1.3 Date: 05/19/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

113

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 29, 2009 December 29, 2009 CX-007835: Categorical Exclusion Determination Energy Efficiency Retrofits on Municipal Buildings: Lighting, Window Replacement, and Insulation CX(s) Applied: B1.3, B2.5, B5.1 Date: 12/29/2009 Location(s): Illinois Offices(s): Energy Efficiency and Renewable Energy December 23, 2009 CX-000110: Categorical Exclusion Determination Bell's Public Lighting Replacement Project CX(s) Applied: B1.3, B5.1 Date: 12/23/2009 Location(s): Bell, California Office(s): Energy Efficiency and Renewable Energy December 17, 2009 CX-000809: Categorical Exclusion Determination Cut, Remove and Replace Off-Gas Exhaust Fan #2 and #3 foundation and Replace Air Monitor Fan #1 and #2 CX(s) Applied: B1.3 Date: 12/17/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

114

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 20, 2013 June 20, 2013 CX-010551: Categorical Exclusion Determination Alcova-Miracle Mile East 115 Kilovolt Transmission Line Structure Replace and Road Maintenance, Carbon and Natrona Counties, Wyoming CX(s) Applied: B1.3 Date: 06/20/2013 Location(s): Wyoming, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region June 20, 2013 CX-010655: Categorical Exclusion Determination Roof Repair on Crane Maintenance Area Roof CX(s) Applied: B1.3 Date: 06/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 18, 2013 CX-010656: Categorical Exclusion Determination Stormwater Drainage Repair CX(s) Applied: B1.3 Date: 06/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 17, 2013 CX-010662: Categorical Exclusion Determination

115

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 7, 2010 December 7, 2010 CX-004824: Categorical Exclusion Determination Dismantle and Remove Tank 6 Riser 7 for Waste Determination (WD) Sampling CX(s) Applied: B1.3 Date: 12/07/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 7, 2010 CX-004821: Categorical Exclusion Determination On-Dock Rail Straddle Portal Test Facility Roller Compacted Concrete Paving Plan CX(s) Applied: B1.3 Date: 12/07/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 7, 2010 CX-004817: Categorical Exclusion Determination Replace Air Handling Unit Heating, Ventilation, and Air Conditioning (HVAC)-AHU-20984 (HVAC-FAN-E21) with HVAC-AHU-E-1, Building 773-A, Section E Southeast Roof CX(s) Applied: B1.3 Date: 12/07/2010

116

Categorical Exclusion Determinations: B1.15 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 19, 2010 March 19, 2010 CX-001303: Categorical Exclusion Determination Morgantown B39, Room B73: New Multi-Media Room Construction CX(s) Applied: B1.15 Date: 03/19/2010 Location(s): Morgantown, West Virginia Office(s): National Energy Technology Laboratory March 17, 2010 CX-001321: Categorical Exclusion Determination Energy Retrofits for State Correctional Facilities - Bullock Correctional Facility CX(s) Applied: B1.15, B5.1 Date: 03/17/2010 Location(s): Bullock County, Alabama Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory March 17, 2010 CX-001320: Categorical Exclusion Determination Grants for State-Sponsored Renewable Energy and Energy Efficiency Projects - New Jersey Meadows Commission CX(s) Applied: B1.15, B5.1 Date: 03/17/2010

117

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 29, 2009 December 29, 2009 CX-000151: Categorical Exclusion Determination Arlington's Replacement of Main Heating Plant Boiler at Arlington High School CX(s) Applied: B2.5, B5.1, B1.3 Date: 12/29/2009 Location(s): Arlington, Massachusetts Office(s): Energy Efficiency and Renewable Energy December 29, 2009 CX-007835: Categorical Exclusion Determination Energy Efficiency Retrofits on Municipal Buildings: Lighting, Window Replacement, and Insulation CX(s) Applied: B1.3, B2.5, B5.1 Date: 12/29/2009 Location(s): Illinois Offices(s): Energy Efficiency and Renewable Energy December 23, 2009 CX-000110: Categorical Exclusion Determination Bell's Public Lighting Replacement Project CX(s) Applied: B1.3, B5.1 Date: 12/23/2009 Location(s): Bell, California Office(s): Energy Efficiency and Renewable Energy

118

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 31, 2013 July 31, 2013 CX-010843: Categorical Exclusion Determination Subcontractor Repair of Roof Leak in Rm. F45 at 703-1B CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 31, 2013 CX-010732: Categorical Exclusion Determination 2013 Spokane District Wood pole Replacement Projects CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): Washington, Washington, Washington, Washington, Idaho Offices(s): Bonneville Power Administration July 31, 2013 CX-010840: Categorical Exclusion Determination Place Old A-Cell Block Crane in Sealand Container for Disposal CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 31, 2013 CX-010884: Categorical Exclusion Determination

119

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 22, 2011 February 22, 2011 CX-005372: Categorical Exclusion Determination Repair Bayou Choctaw Timber Pipe Supports CX(s) Applied: B1.3 Date: 02/22/2011 Location(s): Bayou Choctaw, Louisiana Office(s): Strategic Petroleum Reserve Field Office February 22, 2011 CX-005371: Categorical Exclusion Determination West Hackberry Off-Site Services Contract, 2011-2013 CX(s) Applied: B1.3 Date: 02/22/2011 Location(s): West Hackberry, Texas Office(s): Strategic Petroleum Reserve Field Office February 22, 2011 CX-005370: Categorical Exclusion Determination Clean and Inspect West Hackberry (WHT-14) Brine Tank CX(s) Applied: B1.3 Date: 02/22/2011 Location(s): West Hackberry, Louisiana Office(s): Strategic Petroleum Reserve Field Office February 22, 2011 CX-005369: Categorical Exclusion Determination

120

Categorical Exclusion Determinations: B1.15 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 17, 2010 December 17, 2010 CX-004758: Categorical Exclusion Determination Pennsylvania Economic Development Association Sustainable Business Recovery for Piney Creek LP CX(s) Applied: B1.15, B5.1 Date: 12/17/2010 Location(s): Clarion, Pennsylvania Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 10, 2010 CX-004644: Categorical Exclusion Determination Research Support Facility II, Cafeteria; National Renewable Energy Laboratory Tracking Number 11-003 CX(s) Applied: B1.15, B5.1 Date: 12/10/2010 Location(s): Golden, Colorado Office(s): Energy Efficiency and Renewable Energy, Golden Field Office December 8, 2010 CX-007798: Categorical Exclusion Determination Springfield Maintenance Garage CX(s) Applied: B1.15 Date: 12/08/2010 Location(s): Missouri

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 24, 2010 August 24, 2010 CX-003596: Categorical Exclusion Determination Bayou Choctaw Site Building Upgrades, Phases II and III CX(s) Applied: B1.3 Date: 08/24/2010 Location(s): Bayou Choctaw, Louisiana Office(s): Fossil Energy, Strategic Petroleum Reserve Field Office August 24, 2010 CX-003594: Categorical Exclusion Determination Replace Bayou Choctaw Timber Pile Pipe Supports CX(s) Applied: B1.3 Date: 08/24/2010 Location(s): Bayou Choctaw, Louisiana Office(s): Fossil Energy, Strategic Petroleum Reserve Field Office August 24, 2010 CX-003571: Categorical Exclusion Determination Building 84 Gas Alarm Installation CX(s) Applied: A12, B1.3, B2.3 Date: 08/24/2010 Location(s): Pittsburgh, Pennsylvania Office(s): Fossil Energy, National Energy Technology Laboratory August 23, 2010

122

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 16, 2012 July 16, 2012 CX-008505: Categorical Exclusion Determination Midwest Regional Carbon Sequestration Partnership - Phase Three CX(s) Applied: B3.1, B5.3, B1.3 Date: 07/16/2012 Location(s): Michigan Offices(s): National Energy Technology Laboratory July 11, 2012 CX-009079: Categorical Exclusion Determination Tie pH Adjustment System to 901-F Service Water System CX(s) Applied: B1.3 Date: 07/11/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 11, 2012 CX-009078: Categorical Exclusion Determination Dismantle and removal (D&R) of Domestic Water (DW) & Process Water (PWS) heater tanks CX(s) Applied: B1.3 Date: 07/11/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 10, 2012 CX-008523: Categorical Exclusion Determination

123

Categorical Exclusion Determinations: B1.25 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 9, 2010 December 9, 2010 CX-004744: Categorical Exclusion Determination Provision of Funds to Confederated Salish and Kootenai Tribes (CSKT) for Purchase of the Conrad Drive Land Acquisition CX(s) Applied: B1.25 Date: 12/09/2010 Location(s): Flathead County, Montana Office(s): Bonneville Power Administration November 8, 2010 CX-004465: Categorical Exclusion Determination Provision of funds to The McKenzie River Trust (MRT) for purchase of Melevin Property CX(s) Applied: B1.25 Date: 11/08/2010 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration October 21, 2010 CX-004259: Categorical Exclusion Determination Funding the Acquisition by the State of Montana of Habitat in the West Swan Valley CX(s) Applied: B1.25 Date: 10/21/2010 Location(s): Lake County, Montana

124

Categorical Exclusion Determinations: B1.4 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 25, 2011 March 25, 2011 CX-005478: Categorical Exclusion Determination Clean Energy Grants - City of Marianna CX(s) Applied: A1, B1.4, B5.1, B5.2 Date: 03/25/2011 Location(s): Marianna, Florida Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory March 9, 2011 CX-005400: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant - Retrofit Law Enforcement Center CX(s) Applied: B1.4, B2.5, B5.1 Date: 03/09/2011 Location(s): Pershing County, Nevada Office(s): Energy Efficiency and Renewable Energy February 17, 2011 CX-005270: Categorical Exclusion Determination Woburn Energy Efficiency Retrofits CX(s) Applied: B1.4, B2.2, B2.5, B5.1 Date: 02/17/2011 Location(s): Woburn, Massachusetts Office(s): Energy Efficiency and Renewable Energy

125

Categorical Exclusion Determinations: B1.15 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 24, 2011 May 24, 2011 CX-007090: Categorical Exclusion Determination United States Navy Security System Upgrades CX(s) Applied: B1.15, B2.2 Date: 05/24/2011 Location(s): Albuquerque, NM; Kings Bay, GA; Bangor, WA, Georgia, New Mexico, Washington Office(s): NNSA-Headquarters, Sandia Site Office May 10, 2011 CX-007793: Categorical Exclusion Determination Jonesboro Maintenance Facility Additions CX(s) Applied: B1.15 Date: 05/10/2011 Location(s): Arkansas Offices(s): Southwestern Power Administration April 28, 2011 CX-005661: Categorical Exclusion Determination Clean Energy Development Fund - Renewable Energy Program - Candelora Hydro Project CX(s) Applied: B1.15, B5.1 Date: 04/28/2011 Location(s): Pownal, Vermont Office(s): Energy Efficiency and Renewable Energy, National Energy

126

Categorical Exclusion Determinations: B1.23 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 17, 2011 May 17, 2011 CX-005976: Categorical Exclusion Determination Demolition of Trailers T116, T124, T134 CX(s) Applied: B1.23 Date: 05/17/2011 Location(s): Batavia, Illinois Office(s): Science, Fermi Site Office March 22, 2011 CX-005547: Categorical Exclusion Determination Specific Manufacturing Capability (SMC) Incinerator and Propane Tank System Removal CX(s) Applied: B1.23 Date: 03/22/2011 Location(s): Idaho Office(s): Nuclear Energy, Idaho Operations Office March 3, 2011 CX-007137: Categorical Exclusion Determination Davis Dam Lower 230-kilovolt Substation Service Building Demolition CX(s) Applied: B1.23 Date: 03/03/2011 Location(s): Mohave County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region February 14, 2011 CX-005280: Categorical Exclusion Determination

127

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 4, 2010 March 4, 2010 CX-001134: Categorical Exclusion Determination Repair Water Leak in L-Area Valve 075 CX(s) Applied: B1.3 Date: 03/04/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office March 4, 2010 CX-001129: Categorical Exclusion Determination Cut and Cap Firewater Line Tap-Off Near 714-7N CX(s) Applied: B1.3 Date: 03/04/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office March 3, 2010 CX-001185: Categorical Exclusion Determination Replace Spacer Dampers Along the Wautoma-Rock Creek Number 1 500 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/03/2010 Location(s): Benton County, Yakima County, Office(s): Bonneville Power Administration March 2, 2010

128

Categorical Exclusion Determinations: B1.2 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 26, 2010 April 26, 2010 CX-001947: Categorical Exclusion Determination Community Partners Initiative CX(s) Applied: A9, A11, B1.2, B5.1 Date: 04/26/2010 Location(s): Perth Amboy, New Jersey Office(s): Energy Efficiency and Renewable Energy April 23, 2010 CX-001771: Categorical Exclusion Determination Ormond Beach Educational Website CX(s) Applied: B1.2, B5.1 Date: 04/23/2010 Location(s): Ormond Beach, Florida Office(s): Energy Efficiency and Renewable Energy April 20, 2010 CX-001767: Categorical Exclusion Determination Commerce's Energy Efficiency and Conservation Programs CX(s) Applied: A1, A9, B1.2, B5.1 Date: 04/20/2010 Location(s): Commerce, Colorado Office(s): Energy Efficiency and Renewable Energy April 19, 2010 CX-002101: Categorical Exclusion Determination Compilation of Technical Consultants, Energy Efficiency Retrofits and

129

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 4, 2013 April 4, 2013 CX-010095: Categorical Exclusion Determination Casa Grande Substation, CAG 262 Breaker Replacement CX(s) Applied: B1.3 Date: 04/04/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region April 1, 2013 CX-010106: Categorical Exclusion Determination Flaming Gorge Microwave Site Communications Building Access Road Repairs CX(s) Applied: B1.3 Date: 04/01/2013 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region March 26, 2013 CX-010105: Categorical Exclusion Determination Urban Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 03/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

130

Categorical Exclusion Determinations: B1.7 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 21, 2011 November 21, 2011 CX-007697: Categorical Exclusion Determination Autogrid, Inc. - Highly Dispatchable and Distributed Demand Response for the Integration of Distributed Generation CX(s) Applied: A9, B1.7 Date: 11/21/2011 Location(s): New York, California Offices(s): Advanced Research Projects Agency-Energy November 17, 2011 CX-007365: Categorical Exclusion Determination Integration of the Green Lane Energy Biogas Generator CX(s) Applied: B1.7 Date: 11/17/2011 Location(s): Oregon Offices(s): Bonneville Power Administration September 23, 2011 CX-006826: Categorical Exclusion Determination State Energy Program American Recovery and Reinvestment Act - Washington State University Anaerobic Digester - Nutrient Recovery Technology CX(s) Applied: A9, B1.7, B5.1 Date: 09/23/2011

131

Categorical Exclusion Determinations: B1.25 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 12, 2012 June 12, 2012 CX-008699: Categorical Exclusion Determination Old Highway Bridge Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 12, 2012 CX-008698: Categorical Exclusion Determination Poorman Ponds Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 5, 2012 CX-008701: Categorical Exclusion Determination Spring Basin Wilderness Land Exchange CX(s) Applied: B1.25 Date: 06/05/2012 Location(s): Oregon Offices(s): Bonneville Power Administration May 2, 2012 CX-008151: Categorical Exclusion Determination Provision of Funds to the Columbia Land Trust For Purchase of Five Parcels of Land Located Near the Lower Elochoman River

132

Global ISCCP B1 Browse System | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Global ISCCP B1 Browse System Global ISCCP B1 Browse System Agriculture Community Menu DATA APPS EVENTS DEVELOPER STATISTICS COLLABORATE ABOUT Agriculture You are here Data.gov » Communities » Agriculture » Data Global ISCCP B1 Browse System Dataset Summary Description Global full disk satellite images from 1983 to present. Tags {GIBBS,ISCCP,satellite,full-disk,geostationary,infrared,visible,"water vapor",GOES,POES,DMSP,ISCCP,GVI,AVHRR,TOVS,ATOVS,SSM/I,HIRS,AMSU-A,AMSU-B,TIROS,VTPR,GVAR,CLASS,"Scientific data Stewardship",Browse,Images,"Satellite Images","Satellite data"} Dataset Ratings Overall 0 No votes yet Data Utility 0 No votes yet Usefulness 0 No votes yet Ease of Access 0 No votes yet Dataset Additional Information Last Updated 03/08/12 Publisher National Oceanic and Atmospheric Administration, Department of Commerce

133

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 2, 2011 May 2, 2011 CX-007145: Categorical Exclusion Determination Empire-Electrical District 5 Double Circuit Upgrade Amendment CX(s) Applied: B1.3 Date: 05/02/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region April 28, 2011 CX-007144: Categorical Exclusion Determination Empire-Electrical District 5 Double Circuit Upgrade Amendment CX(s) Applied: B1.3 Date: 04/28/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region April 28, 2011 CX-005765: Categorical Exclusion Determination Feed Pump Flush Water Connection/Lifting Bail Interference (General - F/H Tank Farms) CX(s) Applied: B1.3 Date: 04/28/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

134

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 13, 2010 July 13, 2010 CX-003133: Categorical Exclusion Determination D-Zero Experiment Emergency Generator Fuel Tank Replacement Project CX(s) Applied: B1.3 Date: 07/13/2010 Location(s): Batavia, Illinois Office(s): Fermi Site Office, Science July 12, 2010 CX-003447: Categorical Exclusion Determination Bridge and Access Road Maintenance CX(s) Applied: B1.3 Date: 07/12/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration July 12, 2010 CX-003137: Categorical Exclusion Determination Repairs to West Hackberry Building 301 Roof CX(s) Applied: B1.3 Date: 07/12/2010 Location(s): West Hackberry, Louisiana Office(s): Fossil Energy, Strategic Petroleum Reserve Field Office July 12, 2010 CX-002979: Categorical Exclusion Determination Oregon Energy Efficiency and Conservation Block Grant Formula - City of

135

STANDARD REFERENCE  

E-Print Network (OSTI)

The profession is strongly urged to use the standard reference on the financial framework in the EU, concerning endorsed IFRS in order to give a clear message to the market and to users of financial statements in and outside the EU.

unknown authors

2005-01-01T23:59:59.000Z

136

Categorical Exclusion Determinations: B1.15 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Categorical Exclusion Determinations: B1.15 Existing Regulations B1.15: Support buildings Siting, construction or modification, and operation of support buildings and support structures (including, but not limited to, trailers and prefabricated and modular buildings) within or contiguous to an already developed area (where active utilities and currently used roads are readily accessible). Covered support buildings and structures include, but are not limited to, those for office purposes; parking; cafeteria services; education and training; visitor reception; computer and data processing services; health services or recreation activities; routine maintenance activities; storage of supplies and equipment for administrative services and routine maintenance activities; security (such as security posts); fire

137

Categorical Exclusion Determinations: B1.31 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Categorical Exclusion Determinations: B1.31 Existing Regulations B1.31: Installation or relocation of machinery and equipment Installation or relocation and operation of machinery and equipment (including, but not limited to, laboratory equipment, electronic hardware, manufacturing machinery, maintenance equipment, and health and safety equipment), provided that uses of the installed or relocated items are consistent with the general missions of the receiving structure. Covered actions include modifications to an existing building, within or contiguous to a previously disturbed or developed area, that are necessary for equipment installation and relocation. Such modifications would not appreciably increase the footprint or height of the existing building or

138

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determinations: B1.3 Existing Regulations B1.3: Routine maintenance Routine maintenance activities and custodial services for buildings, structures, rights-of-way, infrastructures (including, but not limited to, pathways, roads, and railroads), vehicles and equipment, and localized vegetation and pest control, during which operations may be suspended and resumed, provided that the activities would be conducted in a manner in accordance with applicable requirements. Custodial services are activities to preserve facility appearance, working conditions, and sanitation (such as cleaning, window washing, lawn mowing, trash collection, painting, and snow removal). Routine maintenance activities, corrective (that is, repair), preventive, and predictive, are required to maintain and preserve

139

Categorical Exclusion Determinations: B1.32 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 9, 2012 April 9, 2012 CX-008194: Categorical Exclusion Determination Michigan City-Canton, Charter Township of CX(s) Applied: A9, B1.32, B5.1 Date: 04/09/2012 Location(s): Michigan Offices(s): Energy Efficiency and Renewable Energy March 28, 2012 CX-008189: Categorical Exclusion Determination Colorado City-Westminster CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1 Date: 03/28/2012 Location(s): Colorado Offices(s): Energy Efficiency and Renewable Energy February 9, 2012 CX-007846: Categorical Exclusion Determination Texas - City - Mesquite CX(s) Applied: A9, B1.32, B2.5, B5.1 Date: 02/09/2012 Location(s): Texas Offices(s): Energy Efficiency and Renewable Energy December 12, 2011 CX-007524: Categorical Exclusion Determination California-City-Davis CX(s) Applied: A1, A9, B1.32, B2.5, B5.1

140

Categorical Exclusion Determinations: B1.32 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 19, 2011 April 19, 2011 CX-005707: Categorical Exclusion Determination Florida-City-Largo CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1 Date: 04/19/2011 Location(s): Largo, Florida Office(s): Energy Efficiency and Renewable Energy April 14, 2011 CX-005721: Categorical Exclusion Determination Rhode Island-City-Providence CX(s) Applied: A1, A9, A11, B1.32, B5.1 Date: 04/14/2011 Location(s): Providence, Rhode Island Office(s): Energy Efficiency and Renewable Energy April 13, 2011 CX-005699: Categorical Exclusion Determination California-City-Murrieta CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1 Date: 04/13/2011 Location(s): Murrieta, California Office(s): Energy Efficiency and Renewable Energy April 12, 2011 CX-005710: Categorical Exclusion Determination Idaho-City-Meridian CX(s) Applied: A1, B1.32, B2.5, B5.1

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Categorical Exclusion Determinations: B1.32 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 3, 2011 August 3, 2011 CX-006433: Categorical Exclusion Determination Texas-City-Conroe CX(s) Applied: B1.32, B2.5, B5.1 Date: 08/03/2011 Location(s): Conroe, Texas Office(s): Energy Efficiency and Renewable Energy August 2, 2011 CX-006427: Categorical Exclusion Determination Ohio-City-Middletown CX(s) Applied: B1.32, B5.1 Date: 08/02/2011 Location(s): Middletown, Ohio Office(s): Energy Efficiency and Renewable Energy July 28, 2011 CX-006328: Categorical Exclusion Determination Indiana-City-Muncie CX(s) Applied: A9, A11, B1.32, B2.5, B5.1 Date: 07/28/2011 Location(s): Muncie, Indiana Office(s): Energy Efficiency and Renewable Energy July 28, 2011 CX-006310: Categorical Exclusion Determination Florida-City-Pompano Beach CX(s) Applied: A1, B1.32, B2.5, B5.1 Date: 07/28/2011 Location(s): Pompano Beach, Florida

142

Data:303c6d02-b1ae-4521-88be-da9a462fe51d | Open Energy Information  

Open Energy Info (EERE)

d02-b1ae-4521-88be-da9a462fe51d d02-b1ae-4521-88be-da9a462fe51d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rappahannock Electric Coop Effective date: 2009/11/01 End date if known: Rate name: SMALL GENERAL SERVICE SCHEDULE B-1-RA Multi-Phase Sector: Commercial Description: APPLICABILITY Applicable to all types of Customers for single-phase service along the lines of the Cooperative, for all uses unless another rate schedule is specifically applicable. The maximum demand to be provided under Schedule B-1 shall be 200 kW. Source or reference: http://www.myrec.coop/content-documents/ScheduleB-1-RA-Nv09.pdf

143

NETL: Reference Shelf - Techline Archive  

NLE Websites -- All DOE Office Websites (Extended Search)

NETL Oil & Natural Gas Technologies Reference Shelf NETL Oil & Natural Gas Technologies Reference Shelf Archive Reports 2012: December, 2012 Final Project Report DE-NT0006554 GIS- and Web-based Water Resource Geospatial Infrastructure for Oil Shale Development [PDF-14.6MB] November, 2012 Final Project Report 08121-2902-02 Technologies of the Future for Pipeline Monitoring and Inspection [PDF-2.47MB] November, 2012 Final Project Report 07122-22 Petrophysical Studies of Unconventional Gas Reservoirs Using High-resolution Rock Imaging [PDF-27.7MB] November, 2012 Final Project Report 08122-35 The Environmentally Friendly Drilling Systems Program [PDF-4.33] October, 2012 Final Project Report DE-FE0003537 Next Generation Surfactants for Improved Chemical Flooding Technology [PDF-1.91MB] October, 2012 Final Project Report 08123-02 Field Demonstration of Alkaline Surfactant Polymer Floods in Mature Oil Reservoirs Brookshire Dome, Texas [PDF-5.06MB]

144

Data:C61ce07d-8da1-45d6-b1b1-0b2da3533e6b | Open Energy Information  

Open Energy Info (EERE)

1ce07d-8da1-45d6-b1b1-0b2da3533e6b 1ce07d-8da1-45d6-b1b1-0b2da3533e6b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Guntersville Electric Board Effective date: 2012/10/01 End date if known: Rate name: SDE SMSD Sector: Commercial Description: Source or reference: Rate Binder#4 (Illinois State University) Source Parent: Comments *Subject to revenue adjustment,environmental adjustment and FCA Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

145

Categorical Exclusion Determinations: B1.32 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 29, 2009 December 29, 2009 CX-001242: Categorical Exclusion Determination Energy Efficiency Retrofits: Heating, Ventilation, Air Conditioning Upgrade, Building Controls, Lighting, Outreach and Education, and Energy Efficiency Remodeling CX(s) Applied: A9, B1.32, B2.5, B5.1 Date: 12/29/2009 Location(s): Peoria, Alabama Office(s): Energy Efficiency and Renewable Energy December 22, 2009 CX-000145: Categorical Exclusion Determination Yavapai-Apache Nation of the Camp Verde Indian Reservation Street Lighting Retrofits CX(s) Applied: B1.32, B5.1 Date: 12/22/2009 Location(s): Arizona Office(s): Energy Efficiency and Renewable Energy December 21, 2009 CX-001273: Categorical Exclusion Determination Energy Efficiency and Conservation Strategy, Energy Efficiency Retrofits, and Develop a Sub-Grant Program

146

Categorical Exclusion Determinations: B1.2 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 10, 2011 February 10, 2011 CX-005508: Categorical Exclusion Determination 43RD Weapons of Mass Destruction Civil Support Team Training Exercise in D-Area Date: 02/10/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 10, 2010 CX-004839: Categorical Exclusion Determination Federal Bureau of Investigation Radiological Dispersion Device Training CX(s) Applied: B1.2 Date: 12/10/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 8, 2010 CX-004671: Categorical Exclusion Determination Role-Based Access Control-Driven Least Privilege Architecture for Control Systems CX(s) Applied: A1, A9, A11, B1.2 Date: 12/08/2010 Location(s): Golden Valley, Minnesota Office(s): Electricity Delivery and Energy Reliability, National Energy

147

Categorical Exclusion Determinations: B1.13 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19, 2011 19, 2011 CX-005684: Categorical Exclusion Determination Construction and Operation of a Cask Processing Enclosure (CPE) at the Transuranic (TRU) Waste Processing Center (TWPC) on the Oak Ridge Reservation, Lenoir City, Tennessee CX(s) Applied: B1.13, B3.1, B6.6 Date: 04/19/2011 Location(s): Lenoir City, Tennessee Office(s): Oak Ridge Office April 19, 2011 CX-006384: Categorical Exclusion Determination Construction and Operation of a Cask Processing Enclosure at the Transuranic Waste Processing Center on the Oak Ridge Reservation, Lenoir City, Tennessee CX(s) Applied: B1.13, B3.1, B6.6 Date: 04/19/2011 Location(s): Lenoir City, Tennessee Office(s): Environmental Management, Oak Ridge Office March 23, 2011 CX-005855: Categorical Exclusion Determination Sidewalks Repair at 704-23K and 701-12K

148

Categorical Exclusion Determinations: B1.35 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Categorical Exclusion Determinations: B1.35 Existing Regulations B1.35: Drop-off, collection, and transfer facilities for recyclable materials Siting, construction, modification, and operation of recycling or compostable material drop-off, collection, and transfer stations on or contiguous to a previously disturbed or developed area and in an area where such a facility would be consistent with existing zoning requirements. The stations would have appropriate facilities and procedures established in accordance with applicable requirements for the handling of recyclable or compostable materials and household hazardous waste (such as paint and pesticides). Except as specified above, the collection of hazardous waste for disposal and the processing of recyclable or compostable materials are

149

Categorical Exclusion Determinations: B1.24 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Categorical Exclusion Determinations: B1.24 Existing Regulations B1.24: Property transfers Transfer, lease, disposition, or acquisition of interests in personal property (including, but not limited to, equipment and materials) or real property (including, but not limited to, permanent structures and land), provided that under reasonably foreseeable uses (1) there would be no potential for release of substances at a level, or in a form, that could pose a threat to public health or the environment and (2) the covered actions would not have the potential to cause a significant change in impacts from before the transfer, lease, disposition, or acquisition of interests. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were

150

DOE Order 420.1B/1C Crosswalk Matrix  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20.1B/1C Crosswalk Matrix 20.1B/1C Crosswalk Matrix Page 1 of 90 February 26, 2013 Citation (420.1C) Original Requirement (O 420.1B, Chg 1, dated 4-19-10) Revised Requirement (O 420.1C, 12-04-2012) Comments 1. 1. OBJECTIVES. To establish facility and programmatic safety requirements for Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), for- a. nuclear and explosives safety design criteria, b. fire protection, c. criticality safety, d. natural phenomena hazards (NPH) mitigation, and e. the System Engineer Program. 1. OBJECTIVE. To establish facility and programmatic safety requirements for the Department of Energy(DOE), including the National Nuclear Security Administration (NNSA), for: a. Nuclear safety design criteria;

151

Categorical Exclusion Determinations: B1.5 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Categorical Exclusion Determinations: B1.5 Existing Regulations B1.5: Existing steam plants and cooling water systems Minor improvements to existing steam plants and cooling water systems (including, but not limited to, modifications of existing cooling towers and ponds), provided that the improvements would not: (1) create new sources of water or involve new receiving waters; (2) have the potential to significantly alter water withdrawal rates; (3) exceed the permitted temperature of discharged water; or (4) increase introductions of, or involve new introductions of, hazardous substances, pollutants, contaminants, or CERCLA-excluded petroleum and natural gas products. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were

152

Categorical Exclusion Determinations: B1.32 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 18, 2010 May 18, 2010 CX-002413: Categorical Exclusion Determination Light Emitting Diodes (LED) Conversion/Retrofit CX(s) Applied: B1.32, B2.2, A1, B5.1 Date: 05/18/2010 Location(s): Manheim, Pennsylvania Office(s): Energy Efficiency and Renewable Energy May 17, 2010 CX-002554: Categorical Exclusion Determination California-City-Hemet CX(s) Applied: B1.32, A1, A9, A11, B5.1 Date: 05/17/2010 Location(s): Hemet, California Office(s): Energy Efficiency and Renewable Energy May 17, 2010 CX-002420: Categorical Exclusion Determination Traffic Signal Light Emitting Diode (LED) Retrofit CX(s) Applied: B1.32, B5.1 Date: 05/17/2010 Location(s): Attleboro, Massachusetts Office(s): Energy Efficiency and Renewable Energy May 11, 2010 CX-002234: Categorical Exclusion Determination Stillaguamish Tribe Proposes to Expand its Stillaguamish Tribe Transit

153

Categorical Exclusion Determinations: B1.32 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 13, 2011 January 13, 2011 CX-004974: Categorical Exclusion Determination Kansas-City-Shawnee CX(s) Applied: A9, A11, B1.32, B2.5, B5.1 Date: 01/13/2011 Location(s): Shawnee, Kansas Office(s): Energy Efficiency and Renewable Energy January 12, 2011 CX-005026: Categorical Exclusion Determination Bob Jones Bike Trail-Southern Connection CX(s) Applied: B1.32, B5.1 Date: 01/12/2011 Location(s): San Luis Obispo, California Office(s): Energy Efficiency and Renewable Energy January 12, 2011 CX-004995: Categorical Exclusion Determination New Mexico-City-Santa Fe CX(s) Applied: A1, B1.32, B2.5, B5.1 Date: 01/12/2011 Location(s): Santa Fe, New Mexico Office(s): Energy Efficiency and Renewable Energy January 12, 2011 CX-004962: Categorical Exclusion Determination California-City-Mission Viejo

154

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 17, 2012 May 17, 2012 CX-008768: Categorical Exclusion Determination Buried Power Line to 64-SX-3 CX(s) Applied: B1.3, B4.6, B4.12 Date: 05/17/2012 Location(s): Wyoming Offices(s): RMOTC May 17, 2012 CX-008768: Categorical Exclusion Determination Buried Power Line to 64-SX-3 CX(s) Applied: B1.3, B4.6, B4.12 Date: 05/17/2012 Location(s): Wyoming Offices(s): RMOTC May 16, 2012 CX-008719: Categorical Exclusion Determination Wood Pole Replacements As Needed on the Naselle-Tarlett No. 1, Holcomb- Naselle No. 1, and Raymond-Willapa River No. 1, 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): Washington Offices(s): Bonneville Power Administration May 16, 2012 CX-008657: Categorical Exclusion Determination Replacement of A-Area Critical Fire Hydrant 3038

155

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 17, 2012 May 17, 2012 CX-008768: Categorical Exclusion Determination Buried Power Line to 64-SX-3 CX(s) Applied: B1.3, B4.6, B4.12 Date: 05/17/2012 Location(s): Wyoming Offices(s): RMOTC May 17, 2012 CX-008768: Categorical Exclusion Determination Buried Power Line to 64-SX-3 CX(s) Applied: B1.3, B4.6, B4.12 Date: 05/17/2012 Location(s): Wyoming Offices(s): RMOTC May 16, 2012 CX-008719: Categorical Exclusion Determination Wood Pole Replacements As Needed on the Naselle-Tarlett No. 1, Holcomb- Naselle No. 1, and Raymond-Willapa River No. 1, 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): Washington Offices(s): Bonneville Power Administration May 16, 2012 CX-008657: Categorical Exclusion Determination Replacement of A-Area Critical Fire Hydrant 3038

156

Categorical Exclusion Determinations: B1.32 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 21, 2010 April 21, 2010 CX-001779: Categorical Exclusion Determination Illinois-City-Joliet CX(s) Applied: B1.32, B3.6, A9, A11, B5.1 Date: 04/21/2010 Location(s): Joliet, Illinois Office(s): Energy Efficiency and Renewable Energy April 20, 2010 CX-002095: Categorical Exclusion Determination Texas-City-Carrollton CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1 Date: 04/20/2010 Location(s): Carrollton, Texas Office(s): Energy Efficiency and Renewable Energy April 20, 2010 CX-002088: Categorical Exclusion Determination Pennsylvania-City-Erie CX(s) Applied: A9, A11, B1.32, B2.5, B5.1 Date: 04/20/2010 Location(s): Erie, Pennsylvania Office(s): Energy Efficiency and Renewable Energy April 19, 2010 CX-002060: Categorical Exclusion Determination New Jersey-City-Middletown, Township of

157

Subject: References:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Subject: Subject: References: DEAR 970.3102-2 Compensation for personal services DEAR 970.5204-13 Allowable costs and fixed-fee (Management and operating contracts) DEAR 970.5204-14 Allowable costs and fixed-fee (support contracts) When is this ~\.cquisition Letter (AL) Effective? This AL is effective 10 days from the date of issuance. This gui~ce supersedes any previous statutory cap on executive compensation. Existing contracts need to be reviewed to determine whether contract terms and conditions are consistent with the guidance in this AL, or whether contract modifications are necessary. When Does this AL Expire? This AL remain;; in effect until superseded or canceled. Whom do you Contact for More Information? Contact the Office of Procurement and Assistance Policy, for questions pertaining to the

158

Reference Undulator Measurement Results  

SciTech Connect

The LCLS reference undulator has been measured 22 times during the course of undulator tuning. These measurements provide estimates of various statistical errors. This note gives a summary of the reference undulator measurements and it provides estimates of the undulator tuning errors. We measured the reference undulator many times during the tuning of the LCLS undulators. These data sets give estimates of the random errors in the tuned undulators. The measured trajectories in the reference undulator are stable and straight to within {+-}2 {micro}m. Changes in the phase errors are less than {+-}2 deg between data sets. The phase advance in the cell varies by less than {+-}2 deg between data sets. The rms variation between data sets of the first integral of B{sub x} is 9.98 {micro}Tm, and the rms variation of the second integral of B{sub x} is 17.4 {micro}Tm{sup 2}. The rms variation of the first integral of B{sub y} is 6.65 {micro}Tm, and the rms variation of the second integral of B{sub y} is 12.3 {micro}Tm{sup 2}. The rms variation of the x-position of the fiducialized beam axis is 35 {micro}m in the final production run This corresponds to an rms uncertainty in the K value of {Delta}K/K = 2.7 x 10{sup -5}. The rms variation of the y-position of the fiducialized beam axis is 4 {micro}m in the final production run.

Wolf, Z

2011-08-18T23:59:59.000Z

159

Data:Bc3d50ea-f3b1-47d8-90b1-3f3e9e00da9b | Open Energy Information  

Open Energy Info (EERE)

ea-f3b1-47d8-90b1-3f3e9e00da9b ea-f3b1-47d8-90b1-3f3e9e00da9b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mountain Lake, Minnesota (Utility Company) Effective date: 2001/01/01 End date if known: Rate name: Residential- Rural Sector: Residential Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/193/Mountain%20Lake_0082.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

160

Data:D75b1a79-a2b1-46be-b63a-fd0236d8f63a | Open Energy Information  

Open Energy Info (EERE)

b1a79-a2b1-46be-b63a-fd0236d8f63a b1a79-a2b1-46be-b63a-fd0236d8f63a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bangor, Wisconsin (Utility Company) Effective date: 2010/05/19 End date if known: Rate name: Ms-1 General Lighting Service:Highway Lighting 100 W HPS Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting, yard and security lighting, and athletic field lighting. Power Cost Adjustment Clause: Charge per all kWh varies monthly. $90.00 per Lamp per year(Includes energy) Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=350

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

MHK Technologies/The B1 buoy | Open Energy Information  

Open Energy Info (EERE)

buoy buoy < MHK Technologies Jump to: navigation, search << Return to the MHK database homepage The B1 buoy.gif Technology Profile Primary Organization Fred Olsen Ltd Technology Resource Click here Wave Technology Type Click here Attenuator Technology Readiness Level Click here TRL 5 6 System Integration and Technology Laboratory Demonstration Technology Description Proprietary Mooring Configuration Proprietary Technology Dimensions Technology Nameplate Capacity (MW) Proprietary Device Testing Scale Test *Currently undergoing open sea testing scaled device Previous tests carried out in the sea with scaled devices 1 20 1 10 and 1 3 scale including the use of the research rig Buldra Lab Test *Various tests performed both in dry conditions and in wave test tanks 1 33 1 20 1 3

162

Ris Energy Report 6 References Reference list for Chapter 3  

E-Print Network (OSTI)

. (2007). Lessons learned from recent promotion strategies for electricity from renewables in EU countries. Report on progress in renewable electricity. Brussels. (Com(2006) 849 final). 6. Danish Energy authority. References for Chapter 5 1. Brahic, C. (2007). Europe postpones decision on car emissions. New

163

Data:09bc8904-6dbc-4746-be4b-22975abe80b1 | Open Energy Information  

Open Energy Info (EERE)

04-6dbc-4746-be4b-22975abe80b1 04-6dbc-4746-be4b-22975abe80b1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lee County Electric Coop, Inc Effective date: 2008/07/01 End date if known: Rate name: Private Area Lighting- Shoebox Fixture (1000W MH Galleria) Sector: Lighting Description: Applicable to customers, other than Street Light Districts, for automatically controlled dusk-to-dawn outdoor lighting where existing overhead secondary circuits are located. Source or reference: https://www.lcec.net/pdf/EntireRateTariff.pdf#page=18 Source Parent: Comments Applicability Demand (kW) Minimum (kW):

164

Data:Bde6f933-ddb9-4600-b1a5-181620571364 | Open Energy Information  

Open Energy Info (EERE)

Bde6f933-ddb9-4600-b1a5-181620571364 Bde6f933-ddb9-4600-b1a5-181620571364 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Jackson, Tennessee (Utility Company) Effective date: 2012/08/01 End date if known: Rate name: General Service GSA1 Sector: Commercial Description: Source or reference: http://www.jaxenergy.com/rates/downloads/ELECTRIC_R.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

165

Data:430fddab-8869-47b1-b61f-685450fca317 | Open Energy Information  

Open Energy Info (EERE)

fddab-8869-47b1-b61f-685450fca317 fddab-8869-47b1-b61f-685450fca317 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Power, Inc Effective date: 2011/10/01 End date if known: Rate name: 70 W HPS Street Lighting Sector: Lighting Description: * Applicable to service furnished from the dusk to dawn for area lighting,lighting of public streets,highways,alleys and parks. Streetlights supported on distribution type wood poles from Cooperative-owned overhead or underground system. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW)

166

Data:55384958-4444-43d9-a513-771c88b1e364 | Open Energy Information  

Open Energy Info (EERE)

4958-4444-43d9-a513-771c88b1e364 4958-4444-43d9-a513-771c88b1e364 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cleco Power LLC Effective date: 2011/02/01 End date if known: Rate name: Customer-Owned Fixture - Cobra Head 150 Watt HPS Sector: Lighting Description: Source or reference: www.cleco.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

167

Data:63658822-5778-43f5-b1cd-bd7ee81571b3 | Open Energy Information  

Open Energy Info (EERE)

2-5778-43f5-b1cd-bd7ee81571b3 2-5778-43f5-b1cd-bd7ee81571b3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stanhope, Iowa (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Commercial Rate #5 (three Phase) Composite Rate Sector: Commercial Description: there is a composite and a tiered rate. Source or reference: See IRPS Binder "A" Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

168

Data:4830e0da-0919-4520-9976-2c2151f00b1b | Open Energy Information  

Open Energy Info (EERE)

30e0da-0919-4520-9976-2c2151f00b1b 30e0da-0919-4520-9976-2c2151f00b1b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Maine Public Service Co Effective date: 2012/01/01 End date if known: Rate name: Street Lighting HPS 70 watts(SL) Sector: Lighting Description: This rate is available to any City, Town, Village or other governmental agency contracting for this service for lighting streets, public ways, or grounds Source or reference: http://www.mainepublicservice.com/media/40532/rate%20sl%20010112.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

169

Data:8feafd76-b1f1-4778-8440-0900863f4fe9 | Open Energy Information  

Open Energy Info (EERE)

feafd76-b1f1-4778-8440-0900863f4fe9 feafd76-b1f1-4778-8440-0900863f4fe9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elk Point, South Dakota (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Security Lights- (Under 174W) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

170

Data:35322b46-9203-45b1-910f-cc75aa855986 | Open Energy Information  

Open Energy Info (EERE)

b46-9203-45b1-910f-cc75aa855986 b46-9203-45b1-910f-cc75aa855986 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Three Rivers Electric Coop Effective date: End date if known: Rate name: Residential Sector: Residential Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

171

Data:0827f207-fffb-488c-918b-b1b381bcc687 | Open Energy Information  

Open Energy Info (EERE)

7-fffb-488c-918b-b1b381bcc687 7-fffb-488c-918b-b1b381bcc687 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of Colorado Effective date: 2010/06/01 End date if known: Rate name: CUSTOMER-OWNED LIGHTING SERVICE - SCHEDULE COL- Metal Halide 70w Sector: Lighting Description: Applicable to the Colorado Department of Transportation and municipalities for Customer-Owned Lighting Service. This rate schedule is subject to all applicable Electric Rate Adjustments as on file and in effect in this tariff. Source or reference: http://www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory%20PDFs/psco_elec_entire_tariff.pdf

172

Data:16852873-60df-4517-b1fb-0c4dc84af95c | Open Energy Information  

Open Energy Info (EERE)

60df-4517-b1fb-0c4dc84af95c 60df-4517-b1fb-0c4dc84af95c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Small Power Service- Three Phase SP-8 Sector: Commercial Description: Applicable for commercial and farm use for use incidental thereto supplied through one meter at one standard secondary voltage for service up to 50 kVA required transformer capacity. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

173

NEWTON's Chemistry References  

NLE Websites -- All DOE Office Websites (Extended Search)

Chemistry References Do you have a great chemistry reference link? Please click our Ideas page. Featured Reference Links: Steve Marsden's Chemistry Resources Steve Marsden's...

174

NEWTON's Physics References  

NLE Websites -- All DOE Office Websites (Extended Search)

Physics References Do you have a great physics reference link? Please click our Ideas page. Featured Reference Links: Physics Links Physics Links from AAPT See the American...

175

diff -crN oommf1.1b1/CHANGES oommf/CHANGES  

Science Conference Proceedings (OSTI)

diff -crN oommf1.1b1/CHANGES oommf/CHANGES. *** oommf1.1b1/ CHANGES Tue Oct 2 12:15:40 2001. --- oommf/CHANGES ...

176

diff -crN oommf-1.0b1/CHANGES oommf/CHANGES  

Science Conference Proceedings (OSTI)

diff -crN oommf-1.0b1/CHANGES oommf/CHANGES. *** oommf-1.0b1/ CHANGES Tue Jul 27 15:49:21 1999. --- oommf/CHANGES ...

177

PHOSPHORUS CHEMISTRY IN THE SHOCKED REGION L1157 B1  

Science Conference Proceedings (OSTI)

We study the evolution of phosphorus-bearing species in one-dimensional C-shock models. We find that the abundances of P-bearing species depend sensitively on the elemental abundance of P in the gas phase and on the abundance of N atoms in the pre-shock gas. The observed abundance of PN and the non-detection of PO toward L1157 B1 are reproduced in C-shock models with shock velocity v = 20 km s{sup -1} and pre-shock density n(H{sub 2}) 10{sup 4}-10{sup 5} cm{sup -3}, if the elemental abundance of P in the gas phase is {approx}10{sup -9} and the N-atom abundance is n(N)/n{sub H} {approx}10{sup -5} in the pre-shock gas. We also find that P-chemistry is sensitive to O- and N-chemistry because N atoms are destroyed mainly by OH and NO. We identify the reactions of O-bearing and N-bearing species that significantly affect P-chemistry.

Aota, T.; Aikawa, Y. [Department of Earth and Planetary Sciences, Kobe University, Kobe 657-8501 (Japan)

2012-12-10T23:59:59.000Z

178

Materials Reference Books  

Science Conference Proceedings (OSTI)

Materials Science Reference Books. ... The Smithells Metals Reference Book Brandis and Brook; Butterworth-Heinemann; Published 1992; ISBN ...

2010-10-05T23:59:59.000Z

179

Data:6c1edc51-163e-450b-84ba-5b1cf7a2c68b | Open Energy Information  

Open Energy Info (EERE)

1-163e-450b-84ba-5b1cf7a2c68b 1-163e-450b-84ba-5b1cf7a2c68b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pataula Electric Member Corp Effective date: 1997/12/01 End date if known: Rate name: Schedule GS - Single Phase (First 200 kWh per kW of Billing Demand) Sector: Commercial Description: Applicable to commercial consumers for all electric service including, lighting, heating and power of one standard secondary voltage required on consumers premises, delivered at on point and metered at or compensated to that voltage. The service rendered hereunder may not be resold. Source or reference: ISU Documentation

180

Microsoft Word - BE1B1C5.tmp  

NLE Websites -- All DOE Office Websites (Extended Search)

Second Half 2010 Second Half 2010 ConocoPhillips Gas Hydrate Production Test Submitted by: ConocoPhillips 700 G Street Anchorage, AK 99501 Principal Investigator: David Schoderbek Prepared for: United States Department of Energy National Energy Technology Laboratory January 31, 2011 Office of Fossil Energy 1 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Quality Reference Samples  

Science Conference Proceedings (OSTI)

Peer-reviewed fats and oils related performance-based control samples for lab quality assurance and quality control. Quality Reference Samples Certified Reference Materials (CRM) aocs certified Certified Reference Materials chemists CRM fat fats lab labo

182

NEWTON's Computer Science References  

NLE Websites -- All DOE Office Websites (Extended Search)

Computer Science References Do you have a great computer reference link? Please click our Ideas page. Featured Reference Links: w3schools.com w3schools.com The site, w3schools.com,...

183

COSY INFINITY Reference Manual  

E-Print Network (OSTI)

7.2, user's refer- ence manual. Technical Report CERN/LEP-COSY INFINITY Reference Manual M. Berz J I July 1990COSY INFlNlTY REFERENCE MANUAL * Martin Berz Accelerator and

Berz, M.

2010-01-01T23:59:59.000Z

184

Shift Reference Manual  

E-Print Network (OSTI)

BERKELEY Shift Reference Manual Akash Deshpande Aleks Göllü1055-1425 S HIFT Reference Manual PRCS project SHIC versionThis is a reference manual for S HIFT . It presents its

Deshpande, Akash; Gollu, Aleks; Semenzato, Luigi

1997-01-01T23:59:59.000Z

185

FINAL REPORT  

NLE Websites -- All DOE Office Websites (Extended Search)

FINAL REPORT AEC-ERDA Research Contract AT (11-1) 2174 Columbia University's Nevis Laboratories "Research in Neutron Velocity Spectroscopy" James RainwatGr DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency Thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or

186

Data:2c46b1e5-2753-411c-87b1-82e4322ef69b | Open Energy Information  

Open Energy Info (EERE)

b1e5-2753-411c-87b1-82e4322ef69b b1e5-2753-411c-87b1-82e4322ef69b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Emerald People's Utility Dist Effective date: 2009/06/08 End date if known: Rate name: DISTRIBUTION SERVICE RATE SCHEDULE Sector: Commercial Description: This schedule applies to electrical generators that may be interconnected in parallel with Emerald's electrical distribution system and meet the definition of a "Qualifying facility" per ORS 758.505(8). This schedule applies only in cases where the energy output from such a facility will be transmitted to an electrical utility other than Emerald.

187

DOE EVMS Cross Reference Checklist | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE EVMS Cross Reference Checklist More Documents & Publications DOE EVMS CROSS Reference Checklist DOE EVMS Risk Assessment Matrix Microsoft Word - g413.3-10Final5-6-08.doc...

188

Immediate colour constancy David H. Foster*, B. 1. Craven? and Elizabeth R. H. Sale  

E-Print Network (OSTI)

Immediate colour constancy David H. Foster*, B. 1. Craven? and Elizabeth R. H. Sale Department resolution on each gun (Ramtek UK Ltd, Basingstoke, Hampshire, 4660 se

Foster, David H.

189

DOE EVMS CROSS Reference Checklist | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOEEVMSCROSSREFERENCECHECKLIST.pdf More Documents & Publications DOE EVMS Cross Reference Checklist DOE EVMS Risk Assessment Matrix Microsoft Word - g413.3-10Final5-6-08...

190

References: See Enclosure 1  

E-Print Network (OSTI)

a. Reissues DoD 4140.65-M (Reference (a)) in accordance with the authority in DoD Directive 5134.12 (Reference (b)) to establish guidance for the issuance, use, and disposal of wood packaging material (WPM) in compliance with International Standards for Phytosanitary Measures (ISPM) Number 15 (Reference (c)). When used as an adjective in this Manual, Reference (c) will be referred to as “ISPM No. 15.” b. Issues WPM procedures to:

unknown authors

2012-01-01T23:59:59.000Z

191

Evidence for the h_b(1P) meson in the decay Upsilon(3S) --> pi0 h_b(1P)  

SciTech Connect

Using a sample of 122 million {Upsilon}(3S) events recorded with the BABAR detector at the PEP-II asymmetric-energy e{sup +}e{sup -} collider at SLAC, we search for the h{sub b}(1P) spin-singlet partner of the P-wave {chi}{sub b}(1P) states in the sequential decay {Upsilon}(3S) {yields} {pi}{sup 0}h{sub b}(1P), h{sub b}(1P) {yields} {gamma}{eta}{sub b}(1S). We observe an excess of events above background in the distribution of the recoil mass against the {pi}{sup 0} at mass 9902 {+-} 4(stat.) {+-} 1(syst.) MeV/c{sup 2}. The width of the observed signal is consistent with experimental resolution, and its significance is 3.0 {sigma}, including systematic uncertainties. We obtain the value (3.7 {+-} 1.1 (stat.) {+-} 0.7 (syst.)) x 10{sup -4} for the product branching fraction {Beta}({Upsilon}(3S) {yields} {pi}{sup 0}h{sub b}) x {Beta}(h{sub b} {yields} {gamma}{eta}{sub b}).

Lees, J.P.

2011-08-12T23:59:59.000Z

192

Data:9c8b1d87-6d3a-4eb1-b1e4-33bf9ccae3bd | Open Energy Information  

Open Energy Info (EERE)

d87-6d3a-4eb1-b1e4-33bf9ccae3bd d87-6d3a-4eb1-b1e4-33bf9ccae3bd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Davis Elec Coop, Inc Effective date: 2000/06/01 End date if known: Rate name: Security Lighting 100 Watt - 9,500 Lumen High Pressure Sodium Sector: Lighting Description: Available to power users in areas designated by cooperative where facilities of adequate capacity and suitable voltage are available. Source or reference: www.jdec.org Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

193

NPP References and Summaries  

NLE Websites -- All DOE Office Websites (Extended Search)

Full references and selected summaries (in alphabetical order of first author name by data set): Chinese Forests NPP Data Set References Gao, Q. and X.S. Zhang (1997) A simulation...

194

Standard Reference Data  

Science Conference Proceedings (OSTI)

... The National Standard Reference Data System (NSRDS-NBS) provides access to the quantitative data of physical sciences, critically evaluated ...

2013-09-19T23:59:59.000Z

195

Standard Reference Materials  

Science Conference Proceedings (OSTI)

... Inn, KGW, Liggett, WS, and Hutchinson, JMR (1984), "The National Bureau of Standards Rocky Flats Soil Standard Reference Material," Nuclear ...

196

Data center reference lists  

Science Conference Proceedings (OSTI)

Data Center Publications. Use the following form to retrieve a list of references to critical compilations, databases, reviews ...

197

Data:13e7b1c5-5294-4ed1-ad46-b1cf8a245f5a | Open Energy Information  

Open Energy Info (EERE)

b1c5-5294-4ed1-ad46-b1cf8a245f5a b1c5-5294-4ed1-ad46-b1cf8a245f5a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Holstein, Wisconsin (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 8am-8pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0860 per kilowatt-hour.

198

Evidence for the h[subscript b](1P) meson in the decay ?(3S)??[superscript 0]h[subscript b](1P)  

E-Print Network (OSTI)

Using a sample of 122×10[superscript 6] ?(3S) events recorded with the BABAR detector at the PEP-II asymmetric-energy e[superscript +]e[superscript -] collider at SLAC, we search for the h[subscript b](1P) spin-singlet ...

Cowan, Ray Franklin

199

PVWatts Version 1 Technical Reference  

DOE Green Energy (OSTI)

The NREL PVWatts(TM) calculator is a web application developed by the National Renewable Energy Laboratory (NREL) that estimates the electricity production of a grid-connected photovoltaic system based on a few simple inputs. PVWatts combines a number of sub-models to predict overall system performance, and makes several hidden assumptions about performance parameters. This technical reference details the individual sub-models, documents assumptions and hidden parameters, and explains the sequence of calculations that yield the final system performance estimation.

Dobos, A. P.

2013-10-01T23:59:59.000Z

200

Final Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95 95 :&,, ' - , i . -- Final Environmental Assessment for Device Assembly - Facility Operations f 3: >fi - , - , ' , 7 - . ' ' , , . I 8 ' , :-<:- L , a . ' ' ' -L. -1 , , ~ e m - . - I ! - , - # 8 , r I I , , , - , . .-- - ' - I S - . ! - , - , Y 2 L - . . 8 : L.-- , r Nevada ' f e s t ~ h e , Nye county, Nevada U. S. Department Of Energy - , 8 - - . 8 - I,, ' - 8 - - , , 8 ENVIRONMENTAL ASSESSMENT for DEVICE ASSEMBLY FACIUTY OPERATIONS MAY 1995 TABLE OF CONTENTS LISTOFFIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv USTOFTABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .iv A. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 8. PURPOSE AND NEED FOR ACTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 B.1 Purpose and Need for Action . . . . . . . . . . . . . . . .

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Chemical Reference Data Group Homepage  

Science Conference Proceedings (OSTI)

Chemical Reference Data Group. Welcome. The Chemical Reference Data Group compiles, evaluates, correlates and measures ...

2013-07-10T23:59:59.000Z

202

DOCKET: A-98-49 Item: II-B1-24  

E-Print Network (OSTI)

DOCKET: A-98-49 Item: II-B1-24 EDOCKET NO: EPA-HQ-OAR-2009-0330 TECHNICAL SUPPORT DOCUMENT ........................................................................15 3.3.3 Organic Ligands

203

Role of CYP1B1 in PAH-DNA Adduct Formation and Breast Cancer Risk  

NLE Websites -- All DOE Office Websites (Extended Search)

Role of CYP1B1 in PAH-DNA Adduct Formation and Breast Cancer Risk Role of CYP1B1 in PAH-DNA Adduct Formation and Breast Cancer Risk Title Role of CYP1B1 in PAH-DNA Adduct Formation and Breast Cancer Risk Publication Type Report Year of Publication 2010 Authors Goth-Goldstein, Regine, Marion L. Russell, Donghui Li, Ana P. MĂĽller, Maira Caleffi, Joao Eschiletti, Marcia Graudenz, and Michael D. Sohn Date Published 04/2010 Publisher Lawrence Berkeley National Laboratory City Berkeley Abstract This study investigated the hypothesis that increased exposure to polycyclic aromatic hydrocarbons (PAHs) increases breast cancer risk. PAHs are products of incomplete burning of organic matter and are present in cigarette smoke, ambient air, drinking water, and diet. PAHs require metabolic transformation to bind to DNA, causing DNA adducts, which can lead to mutations and are thought to be an important pre-cancer marker. In breast tissue, PAHs appear to be metabolized to their cancer-causing form primarily by the cytochrome P450 enzyme CYP1B1. Because the genotoxic impact of PAH depends on their metabolism, we hypothesized that high CYP1B1 enzyme levels result in increased formation of PAH-DNA adducts in breast tissue, leading to increased development of breast cancer. We have investigated molecular mechanisms of the relationship between PAH exposure, CYP1B1 expression and breast cancer risk in a clinic-based case-control study. We collected histologically normal breast tissue from 56 women (43 cases and 13 controls) undergoing breast surgery and analyzed these specimens for CYP1B1 genotype, PAH-DNA adducts and CYP1B1 gene expression. We did not detect any difference in aromatic DNA adduct levels of cases and controls, only between smokers and non-smokers. CYP1B1 transcript levels were slightly lower in controls than cases, but the difference was not statistically significant. We found no correlation between the levels of CYP1B1 expression and DNA adducts. If CYP1B1 has any role in breast cancer etiology it might be through its metabolism of estrogen rather than its metabolism of PAHs. However, due to the lack of statistical power these results should be interpreted with caution

204

High frequency reference electrode  

DOE Patents (OSTI)

A high frequency reference electrode for electrochemical experiments comprises a mercury-calomel or silver-silver chloride reference electrode with a layer of platinum around it and a layer of a chemically and electrically resistant material such as TEFLON around the platinum covering all but a small ring or halo'' at the tip of the reference electrode, adjacent to the active portion of the reference electrode. The voltage output of the platinum layer, which serves as a redox electrode, and that of the reference electrode are coupled by a capacitor or a set of capacitors and the coupled output transmitted to a standard laboratory potentiostat. The platinum may be applied by thermal decomposition to the surface of the reference electrode. The electrode provides superior high-frequency response over conventional electrodes.

Kronberg, J.W.

1991-03-05T23:59:59.000Z

205

High frequency reference electrode  

DOE Patents (OSTI)

A high frequency reference electrode for electrochemical experiments comprises a mercury-calomel or silver-silver chloride reference electrode with a layer of platinum around it and a layer of a chemically and electrically resistant material such as TEFLON around the platinum covering all but a small ring or halo' at the tip of the reference electrode, adjacent to the active portion of the reference electrode. The voltage output of the platinum layer, which serves as a redox electrode, and that of the reference electrode are coupled by a capacitor or a set of capacitors and the coupled output transmitted to a standard laboratory potentiostat. The platinum may be applied by thermal decomposition to the surface of the reference electrode. The electrode provides superior high-frequency response over conventional electrodes. 4 figs.

Kronberg, J.W.

1994-05-31T23:59:59.000Z

206

High frequency reference electrode  

DOE Patents (OSTI)

A high frequency reference electrode for electrochemical experiments comprises a mercury-calomel or silver-silver chloride reference electrode with a layer of platinum around it and a layer of a chemically and electrically resistant material such as TEFLON around the platinum covering all but a small ring or "halo" at the tip of the reference electrode, adjacent to the active portion of the reference electrode. The voltage output of the platinum layer, which serves as a redox electrode, and that of the reference electrode are coupled by a capacitor or a set of capacitors and the coupled output transmitted to a standard laboratory potentiostat. The platinum may be applied by thermal decomposition to the surface of the reference electrode. The electrode provides superior high-frequency response over conventional electrodes.

Kronberg, James W. (Aiken, SC)

1994-01-01T23:59:59.000Z

207

Optical voltage reference  

DOE Patents (OSTI)

An optical voltage reference for providing an alternative to a battery source is described. The optical reference apparatus provides a temperature stable, high precision, isolated voltage reference through the use of optical isolation techniques to eliminate current and impedance coupling errors. Pulse rate frequency modulation is employed to eliminate errors in the optical transmission link while phase-lock feedback is employed to stabilize the frequency to voltage transfer function. 2 figures.

Rankin, R.; Kotter, D.

1994-04-26T23:59:59.000Z

208

Optical voltage reference  

DOE Patents (OSTI)

An optical voltage reference for providing an alternative to a battery source. The optical reference apparatus provides a temperature stable, high precision, isolated voltage reference through the use of optical isolation techniques to eliminate current and impedance coupling errors. Pulse rate frequency modulation is employed to eliminate errors in the optical transmission link while phase-lock feedback is employed to stabilize the frequency to voltage transfer function.

Rankin, R.; Kotter, D.

1992-12-31T23:59:59.000Z

209

APPENDIX B: REFERENCES  

NLE Websites -- All DOE Office Websites (Extended Search)

2010 Appendix B: References Bloomfield, K., J.N. Moore, and R.M. Neilson Jr. 2003. Geothermal Energy Reduces Greenhouse Gases. Geothermal Research Council. GRC Bulletin, April...

210

NEWTON's References About Mathematics  

NLE Websites -- All DOE Office Websites (Extended Search)

Please click our Ideas page. Featured Reference Links: Free Math Video Lectures Mathematics Online Courses View 100s of free instructional math videos. FreeVideoLectures...

211

The Conniver Reference Manual  

E-Print Network (OSTI)

This manual is an introduction and reference to the latest version of the Conniver programming language, an AI language wit general control and data-base structures.

McDermott, Drew V.

1972-05-01T23:59:59.000Z

212

Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Volume 2, Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure: Appendices, Final report  

SciTech Connect

With the issuance of the final Decommissioning Rule (July 27, 1998), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the 1978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N.

1995-11-01T23:59:59.000Z

213

Revised analyses of decommissioning for the reference pressurized Water Reactor Power Station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure, Volume 1, Final report  

Science Conference Proceedings (OSTI)

With the issuance of the final Decommissioning Rule (July 27, 1988), owners and operators of licensed nuclear power plants are required to prepare, and submit to the US Nuclear Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. The NRC staff is in need of bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to provide some of the needed bases documentation. This report contains the results of a review and reevaluation of the {prime}978 PNL decommissioning study of the Trojan nuclear power plant (NUREG/CR-0130), including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the nuclear power plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5--7 year period during which time the spent fuel is stored in the spent fuel pool, prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a ``green field`` condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities.

Konzek, G.J.; Smith, R.I.; Bierschbach, M.C.; McDuffie, P.N. [Pacific Northwest Lab., Richland, WA (United States)

1995-11-01T23:59:59.000Z

214

Data:5de9cc36-3108-427a-b1ae-b7a9733891dc | Open Energy Information  

Open Energy Info (EERE)

de9cc36-3108-427a-b1ae-b7a9733891dc de9cc36-3108-427a-b1ae-b7a9733891dc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Long Island Power Authority Effective date: 2012/03/05 End date if known: Rate name: 288 (Small General Service Time-Of-Use) Sector: Commercial Description: Customers who will use the service on a voluntary basis as an alternative to Service Classification 2, for any purposes other than Residential, when the Authority estimates that the Applicant's demand will be less than 7 KW, subject to Special Provision 7.b. below. Source or reference: http://www.lipower.org/pdfs/company/tariff/lipatariff.pdf

215

Data:Db0d4719-346d-4345-9305-b1fe6879d2e2 | Open Energy Information  

Open Energy Info (EERE)

19-346d-4345-9305-b1fe6879d2e2 19-346d-4345-9305-b1fe6879d2e2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jacksonville Electric Authority Effective date: 2012/01/01 End date if known: Rate name: GS General Service Sector: Commercial Description: To any customer whose service is not provided by any other rate schedule, for all electrical requirements at a single location. All service hereunder will be rendered through a single metering installation. Resale of energy purchased under this rate schedule is not permitted. Source or reference: https://www.jea.com/About_Us/Tariffs_and_Reports/Tariffs_and_Reports.aspx

216

Data:45450755-c4f0-4248-9b1b-9a92923b547c | Open Energy Information  

Open Energy Info (EERE)

50755-c4f0-4248-9b1b-9a92923b547c 50755-c4f0-4248-9b1b-9a92923b547c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power Effective date: 2013/06/01 End date if known: Rate name: OL "Incandescent 103 Watt (Existing Pole) 35 Sector: Lighting Description: Source or reference: http://www.delmarva.com/_res/documents/DEMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

217

Data:40706b55-b1fd-4db8-9c79-aecf21be6429 | Open Energy Information  

Open Energy Info (EERE)

b55-b1fd-4db8-9c79-aecf21be6429 b55-b1fd-4db8-9c79-aecf21be6429 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbus Southern Power Co Effective date: 2012/03/09 End date if known: Rate name: Experimental Residential Real-Time Pricing Service Sector: Residential Description: Source or reference: https://www.aepohio.com/global/utilities/lib/docs/ratesandtariffs/Ohio/2012-04-05_CSP_OP_StandardTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

218

Data:3ea70427-ac14-4b1e-80ab-a1814c62f98f | Open Energy Information  

Open Energy Info (EERE)

0427-ac14-4b1e-80ab-a1814c62f98f 0427-ac14-4b1e-80ab-a1814c62f98f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Provo City Corp (Utility Company) Effective date: 2012/06/01 End date if known: Rate name: Private Outdoor Security (Closed Rate) - 150 W HPS - Steel Pole Sector: Lighting Description: Source or reference: http://www.provo.org/util.rates_summary.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

219

Data:Ae821a53-ceae-49c0-b2e6-b1b7609fe4b6 | Open Energy Information  

Open Energy Info (EERE)

Ae821a53-ceae-49c0-b2e6-b1b7609fe4b6 Ae821a53-ceae-49c0-b2e6-b1b7609fe4b6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mishawaka, Indiana (Utility Company) Effective date: End date if known: Rate name: Commerical(less than 10kW) Sector: Commercial Description: TO WHOM AVAILABLE Available to non-residential and commercial customers. CHARACTER OF SERVICE Alternating current, sixty-cycle, single phase service supplied through a single set of service wires to a single meter location at a standard service voltage. Source or reference: http://mishawaka.in.gov/node/438 Source Parent: Comments Flat rate Adjustment changes by month.

220

Data:Ea8f3963-ca5b-4de0-b1b5-7ca79017471c | Open Energy Information  

Open Energy Info (EERE)

f3963-ca5b-4de0-b1b5-7ca79017471c f3963-ca5b-4de0-b1b5-7ca79017471c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cotton Electric Coop, Inc Effective date: 2010/02/01 End date if known: Rate name: General Service Three Phase Sector: Description: Available to farm home and residential customers subject to the established rules and regulations of the cooperative. No resale, standby, or auxiliary service permitted. Source or reference: ISU Documentation Rate Binder Kelly 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Data:D9832318-0f80-41b1-8029-08bf074d8181 | Open Energy Information  

Open Energy Info (EERE)

18-0f80-41b1-8029-08bf074d8181 18-0f80-41b1-8029-08bf074d8181 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nashville Electric Service Effective date: 2012/06/01 End date if known: Rate name: 60-Minute Response Sector: Commercial Description: 60 MR is an interruptible overlay. The overlay amends the standard contract and applicable rate schedule by adding 60 MR pricing and interruption arrangements. Source or reference: http://www.nespower.com/60mr.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

222

Data:2a05232b-301b-4fa9-8bcf-1b589b1c9a42 | Open Energy Information  

Open Energy Info (EERE)

232b-301b-4fa9-8bcf-1b589b1c9a42 232b-301b-4fa9-8bcf-1b589b1c9a42 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Arrowhead Electric Coop, Inc Effective date: 2012/07/17 End date if known: Rate name: Sliver Plus Choice - Closed Sector: Description: This rate class is now closed and is not being offered to new customers. Source or reference: Illinois State University Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

223

Data:E3acd532-225b-4619-8873-a1637682b1d5 | Open Energy Information  

Open Energy Info (EERE)

acd532-225b-4619-8873-a1637682b1d5 acd532-225b-4619-8873-a1637682b1d5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Three Lights 1000Watt Sector: Lighting Description: - Available to all consumers located on or adjacent to cooperative's single-phase or three-phase lines. - Subject to power cost adjustment,tax adjustment and rate revisions. - Monthly rate depend on light within 150ft. proximity. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

224

Data:9f33a9f9-21ad-47b2-9b1f-4b3771f914ac | Open Energy Information  

Open Energy Info (EERE)

-21ad-47b2-9b1f-4b3771f914ac -21ad-47b2-9b1f-4b3771f914ac No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Polk County Rural Pub Pwr Dist Effective date: 2012/01/01 End date if known: Rate name: General Service CYC 2/REV1 - Three Phase Sector: Residential Description: Source or reference: Illinois State University #10. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

225

Data:9f0ae906-bfb9-4db5-b05c-76b1be5a4007 | Open Energy Information  

Open Energy Info (EERE)

06-bfb9-4db5-b05c-76b1be5a4007 06-bfb9-4db5-b05c-76b1be5a4007 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Taunton, Massachusetts (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Private Lighting (70 W H.P Sodium Fixture) Sector: Lighting Description: These rates are available to consumers for outdoor lighting service for private property. Source or reference: http://www.tmlp.com/page.php?content=rate_sheets_home Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

226

Data:Ea38227f-e85d-4631-9e5d-f40b1e4301af | Open Energy Information  

Open Energy Info (EERE)

227f-e85d-4631-9e5d-f40b1e4301af 227f-e85d-4631-9e5d-f40b1e4301af No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Georgetown, Texas (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Municipal Water & Wastewater Pumping Sector: Commercial Description: *The Power Cost Adjustment is shown in the Flat rate adjustment field. Source or reference: http://billing.georgetown.org/rates/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

227

Data:03a75c2a-280f-488f-b1b4-c56c82016502 | Open Energy Information  

Open Energy Info (EERE)

c2a-280f-488f-b1b4-c56c82016502 c2a-280f-488f-b1b4-c56c82016502 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anaheim, California (Utility Company) Effective date: 2012/09/12 End date if known: Rate name: Lighting- City-Owned System- 7,000 Lumen Mercury Vapor Sector: Lighting Description: Applicable to outdoor area lighting service, other than street and highway lighting service, supplied from overhead lines where the Utility owns and maintains the area lighting equipment. Source or reference: http://www.anaheim.net/utilities/ElectricRules/SCHD-LO.pdf Source Parent: Comments Applicability

228

Data:D7c6cf5b-1e31-4b62-a00c-fb5126171f68 | Open Energy Information  

Open Energy Info (EERE)

cf5b-1e31-4b62-a00c-fb5126171f68 cf5b-1e31-4b62-a00c-fb5126171f68 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Platte-Clay Electric Coop, Inc Effective date: 2013/01/01 End date if known: Rate name: MC3 - Medium Commercial Service Sector: Commercial Description: Applicable to all secondary services supplied by the Cooperative for commercial use which does not qualify for any other commercial rate with an actual demand which requires over 100 kVA but less than 500 kVA of transformer capacity installed. Source or reference: Rate Binder Kelly 11, ISU Documentation Source Parent: Comments

229

Data:64c730b1-d1cd-47e3-a995-c269163ef625 | Open Energy Information  

Open Energy Info (EERE)

30b1-d1cd-47e3-a995-c269163ef625 30b1-d1cd-47e3-a995-c269163ef625 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Little River Electric Coop Inc Effective date: 2012/09/01 End date if known: Rate name: Residential Energy Conservation Sector: Residential Description: Schedule 2 - Residential Energy Conservation Source or reference: http://lreci.coopwebbuilder.com/sites/lreci.coopwebbuilder.com/files/new_rate_schedule.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

230

Data:B07ab750-bc6b-49b1-b786-b9d6d8ae2416 | Open Energy Information  

Open Energy Info (EERE)

ab750-bc6b-49b1-b786-b9d6d8ae2416 ab750-bc6b-49b1-b786-b9d6d8ae2416 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sacramento Municipal Utility District Effective date: 2013/01/01 End date if known: 2013/12/31 Rate name: RWEH - Three Phase Sector: Residential Description: Source or reference: https://www.smud.org/en/residential/customer-service/rate-information/rates-rules-regulations.htm Source Parent: Comments Flat Rate adjustment is the solar surcharge Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

231

Data:18b6472c-6b1d-4089-8196-d48c1658e79f | Open Energy Information  

Open Energy Info (EERE)

b6472c-6b1d-4089-8196-d48c1658e79f b6472c-6b1d-4089-8196-d48c1658e79f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Gulf States Louisiana LLC Effective date: 2005/09/28 End date if known: Rate name: 2 Large power service (LPS - TOD) - (primary voltage) Sector: Industrial Description: This rate is applicable on a voluntary basis under the regular terms and conditions of the company to customers who contract for not less then 2500 kW of electric service at company's available line voltage. Source or reference: www.entergy-louisiana.com/content/price/tariffs/egsi/egsila_lps-tod.pdf

232

Data:E7f51c50-51b1-4244-b052-7b52306c755a | Open Energy Information  

Open Energy Info (EERE)

f51c50-51b1-4244-b052-7b52306c755a f51c50-51b1-4244-b052-7b52306c755a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Intermountain Rural Elec Assn Effective date: 2013/02/01 End date if known: Rate name: Optional High Load Factor Service- Demand Metered Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

233

Data:0a30b27c-f98a-49b1-bd26-9cf79478cfb6 | Open Energy Information  

Open Energy Info (EERE)

b27c-f98a-49b1-bd26-9cf79478cfb6 b27c-f98a-49b1-bd26-9cf79478cfb6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lansing, Michigan (Utility Company) Effective date: 2011/03/01 End date if known: Rate name: CUSTOMER OWNED SYSTEMS (High Pressure Sodium Luminaire 70 W) Sector: Lighting Description: Available to any political subdivision or agency of the State of Michigan for street lighting service for any system consisting of one or more luminaires where the BWL has an existing distribution system available. Source or reference: http://www.lansingmi.gov/Lansing/clerk/BWL_Proposed.pdf

234

Data:76b1e89f-d33e-4470-b34b-67919d5d8645 | Open Energy Information  

Open Energy Info (EERE)

b1e89f-d33e-4470-b34b-67919d5d8645 b1e89f-d33e-4470-b34b-67919d5d8645 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Harriman, Tennessee (Utility Company) Effective date: 2012/08/01 End date if known: Rate name: General Power, Large Commercial Sector: Commercial Description: General Power, Large commercial. Source or reference: http://www.hub-tn.com/pdf/Commercial%20rates%200812.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

235

Data:C9ce392b-bb0c-4621-b123-45b1d3508223 | Open Energy Information  

Open Energy Info (EERE)

ce392b-bb0c-4621-b123-45b1d3508223 ce392b-bb0c-4621-b123-45b1d3508223 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nodak Electric Coop Inc Effective date: 2012/05/20 End date if known: Rate name: GS Urban-Three Phase ST Sector: Residential Description: Additional Meters (Off-Peak Included) $ 3.60/Meter/Month Renewable Energy Market Adjustment $0.003/KWH (Added to All Above Energy Rates) Controlled Water Heater Credit $.00736/KWH Applies to the first 1,000 KWHs each month (October-March) Source or reference: http://www.nodakelectric.com/wp-content/uploads/2011/04/General-Service-Rate-Urban1.pdf

236

Data:D69d2911-84a9-4152-8738-fb49de2ea1b1 | Open Energy Information  

Open Energy Info (EERE)

911-84a9-4152-8738-fb49de2ea1b1 911-84a9-4152-8738-fb49de2ea1b1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Paris, Tennessee (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: General Power- GSA3 Sector: Commercial Description: If the higher of the customer's currently effective contract demand or its highest billing demand during the latest 12 month period is greater than 1000 kW. Source or reference: ISU Documentation Rate Binder Ted #11 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

237

Data:7a72b7b1-a081-4088-a361-7a39a003647a | Open Energy Information  

Open Energy Info (EERE)

b1-a081-4088-a361-7a39a003647a b1-a081-4088-a361-7a39a003647a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nolin Rural Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Large Power Sector: Commercial Description: Source or reference: www.nolinrecc.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

238

Data:609222d3-576b-40b1-985f-e0f429d518ae | Open Energy Information  

Open Energy Info (EERE)

d3-576b-40b1-985f-e0f429d518ae d3-576b-40b1-985f-e0f429d518ae No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cornhusker Public Power Dist Effective date: 2012/01/01 End date if known: Rate name: AOL Seasonal Metered Service 100W MV Fixture Sector: Lighting Description: monthly charge = charge/12 Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

239

Data:48e9de8b-8a00-4582-8069-ec9dcd80b1e3 | Open Energy Information  

Open Energy Info (EERE)

8a00-4582-8069-ec9dcd80b1e3 8a00-4582-8069-ec9dcd80b1e3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wake Electric Membership Corp Effective date: 2013/01/01 End date if known: Rate name: Outdoor Lighting Service - Sodium Vapor Units 100 Watt - Enclosed Sector: Lighting Description: Available in all territory served by the Cooperative subject to the established Service Rules and Regulations of the Cooperative. Source or reference: www.wemc.com/documents/RATESCHEDULE2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

240

Data:D8fd01fe-8e04-43f0-b1b9-d618852a9360 | Open Energy Information  

Open Energy Info (EERE)

D8fd01fe-8e04-43f0-b1b9-d618852a9360 D8fd01fe-8e04-43f0-b1b9-d618852a9360 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Moorhead, Minnesota (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Residential-Dual-Fuel- Water Heater Control Credit Sector: Residential Description: Available to residential dual-fuel customers only, for Long-Term Control. Short-Term Control: Metered on main service meter(-$3.00/month) credit. Source or reference: http://www.mpsutility.com/index.php/residential-rates?layout=blog Source Parent: Comments Applicability Demand (kW) Minimum (kW):

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Data:2085b1cf-b31e-4d71-ac2a-6812547c308d | Open Energy Information  

Open Energy Info (EERE)

b1cf-b31e-4d71-ac2a-6812547c308d b1cf-b31e-4d71-ac2a-6812547c308d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wake Electric Membership Corp Effective date: 2013/01/01 End date if known: Rate name: Outdoor Lighting Service - Metal Halide 1000 watts - Enclosed Sector: Lighting Description: Available in all territory served by the Cooperative subject to the established Service Rules and Regulations of the Cooperative. Source or reference: www.wemc.com/documents/RATESCHEDULE2013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

242

Data:7abb6335-af9f-4c46-b6f4-0d5b1f807dc9 | Open Energy Information  

Open Energy Info (EERE)

abb6335-af9f-4c46-b6f4-0d5b1f807dc9 abb6335-af9f-4c46-b6f4-0d5b1f807dc9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tacoma, Washington (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: RS - Schedule A-1 - City of Lakewood - collectively metered apartments Sector: Residential Description: Available for domestic purposes in residences, apartments, duplex houses and multiple family dwellings. Source or reference: www.mytpu.org/customer-service/rates/power-rates/power-rates-schedules.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

243

Data:E8412fa5-9439-41b1-975a-d606ee31461e | Open Energy Information  

Open Energy Info (EERE)

12fa5-9439-41b1-975a-d606ee31461e 12fa5-9439-41b1-975a-d606ee31461e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Snapping Shoals El Member Corp Effective date: End date if known: Rate name: Outdoor Lighting Underground HPS 150 W Sector: Lighting Description: * 150-watt high pressure sodium security light mounted on 20-foot fiberglass pole * 5-year contract required Source or reference: http://www.ssemc.com/products/security.asp Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

244

Data:B528f6c1-df24-4d00-8588-5b1d112a9621 | Open Energy Information  

Open Energy Info (EERE)

-df24-4d00-8588-5b1d112a9621 -df24-4d00-8588-5b1d112a9621 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Loup River Public Power Dist Effective date: 2013/01/15 End date if known: Rate name: District Owned Lighting EMH 20000 Sector: Commercial Description: Source or reference: http://www.loup.com/customersvc/rates.asp Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

245

Data:C7c69028-1068-45b1-bbb0-15545162b8c6 | Open Energy Information  

Open Energy Info (EERE)

8-1068-45b1-bbb0-15545162b8c6 8-1068-45b1-bbb0-15545162b8c6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New Hampshire Elec Coop Inc Effective date: 2013/05/01 End date if known: Rate name: LGT10-LU100 Sector: Commercial Description: Sodium: only available at existing locations with existing fixtures Source or reference: http://www.nhec.com/filerepository/rate_change_sheets_for_2013_may01.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

246

Data:660f7753-e67e-4ae9-b1cc-79d03d22d9cd | Open Energy Information  

Open Energy Info (EERE)

53-e67e-4ae9-b1cc-79d03d22d9cd 53-e67e-4ae9-b1cc-79d03d22d9cd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Independence, Missouri (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Private Outdoor Lighting- (70 W Flood Light HPS) Sector: Lighting Description: When mercury vapor area light fixture is mounted on an existing wood distribution pole where secondary voltage exists Source or reference: http://www.ci.independence.mo.us/PL/Rates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

247

Data:1f25e398-b1dd-47ca-aa74-c66cdd193b78 | Open Energy Information  

Open Energy Info (EERE)

5e398-b1dd-47ca-aa74-c66cdd193b78 5e398-b1dd-47ca-aa74-c66cdd193b78 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Belmont, Wisconsin (Utility Company) Effective date: 2007/03/12 End date if known: Rate name: Ms-1 Street and Security Lighting Service: 175 W MV(Overhead) Sector: Lighting Description: This schedule will be applied to municipal street light lighting. The Utility will furnish, install, and maintain street lighting units. Commitment to Community Program Rider: 2.0% of the total electric bill. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=440

248

Data:6235cfbe-745c-48b1-8b11-5e5296de5c07 | Open Energy Information  

Open Energy Info (EERE)

cfbe-745c-48b1-8b11-5e5296de5c07 cfbe-745c-48b1-8b11-5e5296de5c07 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Benton County Effective date: 2012/01/01 End date if known: Rate name: Residential Single-Phase Sector: Residential Description: APPLICABLE: To domestic use of electric energy by all residential urban and rural customers which may include community lawn irrigation systems and single family residential swimming pools. Minimum monthly bill shall be the monthly customer charge. Source or reference: http://www.bentonpud.org/images/site/flipbooks/BentonPUDPolicyRates%20%282%29/#/8/

249

Data:F11b3f17-f048-45b1-94e5-b7ffb2560530 | Open Energy Information  

Open Energy Info (EERE)

f17-f048-45b1-94e5-b7ffb2560530 f17-f048-45b1-94e5-b7ffb2560530 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Navopache Electric Coop, Inc Effective date: 2012/08/01 End date if known: Rate name: 250 Watt MVL 110 kWh Customer Owned Sector: Lighting Description: Source or reference: http://navopache.coopwebbuilder.com/sites/navopache.coopwebbuilder.com/files/security_lights_2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

250

Data:489bce14-4b1c-4580-8a88-75b7df781964 | Open Energy Information  

Open Energy Info (EERE)

bce14-4b1c-4580-8a88-75b7df781964 bce14-4b1c-4580-8a88-75b7df781964 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Baltimore Gas & Electric Co Effective date: 2013/06/23 End date if known: Rate name: 12ft fiberglass pole Sector: Lighting Description: Source or reference: http://www.bge.com/myaccount/billsrates/ratestariffs/electricservice/pages/electric-services-rates-and-tariffs.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

251

Data:2b254bf1-0c14-4886-b1c9-3e4664e70931 | Open Energy Information  

Open Energy Info (EERE)

bf1-0c14-4886-b1c9-3e4664e70931 bf1-0c14-4886-b1c9-3e4664e70931 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Grand Electric Coop, Inc Effective date: 2012/07/01 End date if known: Rate name: Unmetered Security Light - 100 HPS Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

252

Data:C29bdef9-292f-4864-94b7-922b6b1f73c8 | Open Energy Information  

Open Energy Info (EERE)

bdef9-292f-4864-94b7-922b6b1f73c8 bdef9-292f-4864-94b7-922b6b1f73c8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ozarks Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: Large Power Off-Peak Single Phase Sector: Commercial Description: This rate schedule is available to all existing large power off peak customers as of the date of approval of this tariff and new customers requiring 300 kVA or less of transformer capacity with a monthly load factor of 30% or higher located along or near the cooperative's existing distribution lines. Source or reference: ISU Archive

253

Data:4f30dadc-35dd-4e7f-a7b6-b1bba01e2e9e | Open Energy Information  

Open Energy Info (EERE)

dadc-35dd-4e7f-a7b6-b1bba01e2e9e dadc-35dd-4e7f-a7b6-b1bba01e2e9e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Arapahoe, Nebraska (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Residential Sector: Residential Description: Source or reference: ISU Documentation Rate Binder Ted #6 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

254

Data:590db6b1-68f4-4ac7-b099-2988881ecaeb | Open Energy Information  

Open Energy Info (EERE)

b1-68f4-4ac7-b099-2988881ecaeb b1-68f4-4ac7-b099-2988881ecaeb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nashville Electric Service Effective date: 2012/12/01 End date if known: Rate name: GSA-3 Sector: Commercial Description: If the higher of (a) the customer's currently effective contract demand or (b) its highest billing demand during the latest 12-month period is greater than 1,000 kW: Source or reference: http://www.nespower.com/documents/GSADec12.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

255

Data:Ef391a09-ea3a-43ef-b229-b1afdcb8a8ef | Open Energy Information  

Open Energy Info (EERE)

a09-ea3a-43ef-b229-b1afdcb8a8ef a09-ea3a-43ef-b229-b1afdcb8a8ef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: C & L Electric Coop Corp Effective date: 2012/09/24 End date if known: Rate name: Outdoor Lighting Service - 175 Watt MVL Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

256

Data:C46103cc-5042-4b1e-ad9b-8b792f7aafd6 | Open Energy Information  

Open Energy Info (EERE)

103cc-5042-4b1e-ad9b-8b792f7aafd6 103cc-5042-4b1e-ad9b-8b792f7aafd6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Emerson, Nebraska (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: 250 watt Mercury Vapor Sector: Lighting Description: All customers are eligible to lease private lighting owned and maintained by NeNPPD. This leased lighting is unmetered and NeNPPD provides all of the energy required. See other side for private lighting service agreement Source or reference: http://nnppd.com/billing/rates/ Source Parent: Comments Applicability Demand (kW) Minimum (kW):

257

Data:361821e3-113c-4a40-a9b1-becf02d08bae | Open Energy Information  

Open Energy Info (EERE)

e3-113c-4a40-a9b1-becf02d08bae e3-113c-4a40-a9b1-becf02d08bae No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Colquitt Electric Membership Corp Effective date: 1993/06/01 End date if known: Rate name: 150W Existing HPS-Cobra, UNDERGROUND WIRING, Metal or Fiberglass Pole Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Cooperative's specifications. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

258

Data:3e4c8afd-bfa3-49b1-b4eb-ed14512ed693 | Open Energy Information  

Open Energy Info (EERE)

afd-bfa3-49b1-b4eb-ed14512ed693 afd-bfa3-49b1-b4eb-ed14512ed693 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Canadian Valley Elec Coop, Inc Effective date: 2009/02/11 End date if known: Rate name: Security Lighting 175Watt MV Sector: Lighting Description: 1. Available to all areas served retail by cooperative. 2. Available to only Standard Area Security Lights and poles conforming to Cooperative specifications. 3. Subject to cost adjustment. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

259

Data:E0405081-abb7-4b6d-b3b1-c318275fb11a | Open Energy Information  

Open Energy Info (EERE)

081-abb7-4b6d-b3b1-c318275fb11a 081-abb7-4b6d-b3b1-c318275fb11a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Holy Cross Electric Assn, Inc Effective date: 2011/07/01 End date if known: Rate name: STREET, HIGHWAY AND AREA LIGHTING: All 75 watt Street Lights & Under Sector: Lighting Description: This rate applies when all fixtures are owned by the consumer and mounted on their poles or decorative standards. Source or reference: http://www.holycross.com/about-us/rates-charges Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

260

Data:0782f0b1-605f-4764-9fa7-27445a02d5d3 | Open Energy Information  

Open Energy Info (EERE)

b1-605f-4764-9fa7-27445a02d5d3 b1-605f-4764-9fa7-27445a02d5d3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of Colorado Effective date: 2010/06/01 End date if known: Rate name: CUSTOMER-OWNED LIGHTING SERVICE - SCHEDULE COL - HPS 250w 2 Sector: Lighting Description: Applicable to the Colorado Department of Transportation and municipalities for Customer-Owned Lighting Service. This rate schedule is subject to all applicable Electric Rate Adjustments as on file and in effect in this tariff. Source or reference: http://www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory%20PDFs/psco_elec_entire_tariff.pdf

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Data:07cefab1-215c-460c-bc82-b1a7db7d77df | Open Energy Information  

Open Energy Info (EERE)

cefab1-215c-460c-bc82-b1a7db7d77df cefab1-215c-460c-bc82-b1a7db7d77df No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Frontier Power Company Effective date: 2009/01/01 End date if known: Rate name: Commercial And Industrial Lighting And Power Service Sector: Commercial Description: Single phase or three phase,60hertz at available secondary voltage.Motors that have a rated capacity in excess of ten horsepower must be three phase. Source or reference: Rate Binder#8(Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

262

Data:5c28eedb-ca45-443c-b1e7-fb2d74ba7908 | Open Energy Information  

Open Energy Info (EERE)

eedb-ca45-443c-b1e7-fb2d74ba7908 eedb-ca45-443c-b1e7-fb2d74ba7908 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of South Sioux City, Nebraska (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Commercial and Industrial Non Demand- Three Phase Sector: Commercial Description: To any commercial or industrial customer for all purposes. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

263

Data:Ad9324b1-239e-4c89-b41d-2394aa089bdd | Open Energy Information  

Open Energy Info (EERE)

324b1-239e-4c89-b41d-2394aa089bdd 324b1-239e-4c89-b41d-2394aa089bdd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Atlantic City Electric Co Effective date: 2012/11/01 End date if known: Rate name: RS-FP (Bundled) Sector: Residential Description: Available for full domestic service to individually metered residential customers, including rural domestic customers, engaged principally in agricultural pursuits. Source or reference: http://www.atlanticcityelectric.com/_res/documents/NJTariffSectionIV.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

264

Data:677b00dd-f9b1-429d-bab3-33bdf80f2738 | Open Energy Information  

Open Energy Info (EERE)

dd-f9b1-429d-bab3-33bdf80f2738 dd-f9b1-429d-bab3-33bdf80f2738 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Concord, North Carolina (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Building Construction Sector: Commercial Description: Available only as temporary service to builders for use in construction of buildings or other establishments which will receive, upon completion, permanent electric service from the City's lines. Source or reference: http://www.concordnc.gov/Departments/Electric/Rate-Schedules Source Parent: Comments Applicability Demand (kW)

265

Data:C6de82c4-a527-4dd7-b43d-6aaaff24e9b1 | Open Energy Information  

Open Energy Info (EERE)

2c4-a527-4dd7-b43d-6aaaff24e9b1 2c4-a527-4dd7-b43d-6aaaff24e9b1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Loup River Public Power Dist Effective date: 2013/01/15 End date if known: Rate name: District Owned Lighting EMN 50000 Sector: Commercial Description: Source or reference: http://www.loup.com/customersvc/rates.asp Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

266

Data:E8113b0e-3eef-4a47-b1c6-3b882458f467 | Open Energy Information  

Open Energy Info (EERE)

3b0e-3eef-4a47-b1c6-3b882458f467 3b0e-3eef-4a47-b1c6-3b882458f467 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Courtland, Alabama (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: TOU-MSB Sector: Industrial Description: Source or reference: ISU Ted Binder #4 Source Parent: Comments flat rate & fuel adjustment charges change monthly note: there is also $350 administrative char Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

267

Data:B5356658-40f9-443d-b1c4-66413f0cfce3 | Open Energy Information  

Open Energy Info (EERE)

40f9-443d-b1c4-66413f0cfce3 40f9-443d-b1c4-66413f0cfce3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Imperial Irrigation District Effective date: 1994/01/01 End date if known: Rate name: SCHEDULE SL-1 STREET AND HIGHWAY LIGHTING SERVICE-HIGH-PRESSURE SODIUM VAPOR 100W Sector: Lighting Description: APPLICABILITY Applicable to service to street and highway lighting installations supplied from overhead lines, where the District owns and maintains the entire equipment. Monthly Usage: 47kWh Source or reference: http://www.iid.com/Modules/ShowDocument.aspx?documentid=2577 Source Parent:

268

Data:376926e9-61b1-4d1e-b06d-1df0a2e51861 | Open Energy Information  

Open Energy Info (EERE)

61b1-4d1e-b06d-1df0a2e51861 61b1-4d1e-b06d-1df0a2e51861 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anoka, Minnesota (Utility Company) Effective date: 2009/01/01 End date if known: Rate name: Interruptible Rate (Under 500KW) Sector: Industrial Description: Under 500KW Source or reference: Rate Binder Kelly 3 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

269

Data:A2a1424e-14da-4e24-a8a1-328099fd68b1 | Open Energy Information  

Open Energy Info (EERE)

e-14da-4e24-a8a1-328099fd68b1 e-14da-4e24-a8a1-328099fd68b1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Frankfort, Kentucky (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Area Lighting- (250W MH With 35' Wood Pole) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

270

Data:D0fac8c0-a44b-4841-b1df-be42a608d028 | Open Energy Information  

Open Energy Info (EERE)

fac8c0-a44b-4841-b1df-be42a608d028 fac8c0-a44b-4841-b1df-be42a608d028 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Residential Farm Home Service- RFS-8 Sector: Residential Description: Applicable to all residential and farm consumers for use in the home and on the farm for service up to 50 kVA of required transformer capacity with the exception of: 1) commercial related use and 2) bulk barns. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

271

Data:A30d9f40-8904-4c52-a765-b2cd8b1ab659 | Open Energy Information  

Open Energy Info (EERE)

f40-8904-4c52-a765-b2cd8b1ab659 f40-8904-4c52-a765-b2cd8b1ab659 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anoka, Minnesota (Utility Company) Effective date: 2012/04/01 End date if known: Rate name: Parallel Generation Rate Simultaneous Purchase and Sale Rate Industrial Sector: Industrial Description: Less than 40 KW Source or reference: Rate Binder Kelly 3 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

272

Data:Fa3c9295-cd9e-42b1-baed-38e4011f618b | Open Energy Information  

Open Energy Info (EERE)

95-cd9e-42b1-baed-38e4011f618b 95-cd9e-42b1-baed-38e4011f618b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Ruston, Louisiana (Utility Company) Effective date: End date if known: Rate name: INDUSTRIAL Sector: Description: this rate has 9 tiered categories Source or reference: Rate Binder #10A, Illinois State University. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

273

Data:5d3b0cda-7b7e-4272-b1ab-e48373d258bc | Open Energy Information  

Open Energy Info (EERE)

b0cda-7b7e-4272-b1ab-e48373d258bc b0cda-7b7e-4272-b1ab-e48373d258bc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ohio Edison Co Effective date: 2009/01/23 End date if known: Rate name: RS (Residential Service) Sector: Residential Description: Available for residential service to installations served through one meter for each family unit in a residence or apartment. Source or reference: https://www.firstenergycorp.com/content/dam/customer/Customer%20Choice/Files/Ohio/tariffs/OE-2012-Electric-Service.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

274

Data:42f44a41-b630-432c-96dc-4b196b1ccc67 | Open Energy Information  

Open Energy Info (EERE)

-b630-432c-96dc-4b196b1ccc67 -b630-432c-96dc-4b196b1ccc67 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power Effective date: 2013/06/01 End date if known: Rate name: OL "HPS" 1000 Watt (Enclosed) (Customer Owned w/o maintenance) 378 kW Sector: Lighting Description: Source or reference: http://www.delmarva.com/_res/documents/DEMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

275

Data:263f3444-2c70-4931-b1ce-197aaa8748e9 | Open Energy Information  

Open Energy Info (EERE)

44-2c70-4931-b1ce-197aaa8748e9 44-2c70-4931-b1ce-197aaa8748e9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Baltimore Gas & Electric Co Effective date: 2013/02/23 End date if known: Rate name: 13000 lumen 205 wat MH (pendant) Sector: Lighting Description: Source or reference: http://www.bge.com/myaccount/billsrates/ratestariffs/electricservice/pages/electric-services-rates-and-tariffs.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

276

Data:9e7233f6-730f-4c26-bdfb-365e4b1f8c14 | Open Energy Information  

Open Energy Info (EERE)

f6-730f-4c26-bdfb-365e4b1f8c14 f6-730f-4c26-bdfb-365e4b1f8c14 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jackson Electric Member Corp Effective date: End date if known: Rate name: Outdoor Lighting Decashield MH 175 W Non Wood Pole Sector: Lighting Description: Source or reference: http://www.jacksonemc.com/business-manage-my-account-commercial-rates-options/schedules/outdoor-lighting-service Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

277

Data:995e3b8c-6820-4e27-b1cc-4f560d92dba3 | Open Energy Information  

Open Energy Info (EERE)

e3b8c-6820-4e27-b1cc-4f560d92dba3 e3b8c-6820-4e27-b1cc-4f560d92dba3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No4 Pinal Cnty Effective date: 2009/01/01 End date if known: Rate name: Night Light Rate- 175 W Mercury Vapor Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

278

Data:590754a4-4866-4617-8afd-f35b1eb9fd5e | Open Energy Information  

Open Energy Info (EERE)

a4-4866-4617-8afd-f35b1eb9fd5e a4-4866-4617-8afd-f35b1eb9fd5e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stafford, Kansas (Utility Company) Effective date: End date if known: Rate name: E5 - 55 Horsepower Sector: Commercial Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Rates%20Collected/Attachments/627/rate%20information%20for%20Stafford.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

279

Data:D8341517-3b1c-4013-a890-11aa7406ce08 | Open Energy Information  

Open Energy Info (EERE)

b1c-4013-a890-11aa7406ce08 b1c-4013-a890-11aa7406ce08 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Dalton Utilities Effective date: 2011/01/01 End date if known: Rate name: Small Commercial Small Multiple Use Sector: Commercial Description: Available throughout the service area from existing lines of adequate capacity as determined by the Board. Source or reference: Rate Binder Kelly 2 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

280

Data:55ddce70-6b50-4581-ba4d-c0a8b1bac528 | Open Energy Information  

Open Energy Info (EERE)

6b50-4581-ba4d-c0a8b1bac528 6b50-4581-ba4d-c0a8b1bac528 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Holy Cross Electric Assn, Inc Effective date: 2011/07/01 End date if known: Rate name: STREET, HIGHWAY AND AREA LIGHTING: 250 Watt HPS Sector: Lighting Description: This rate applies when all fixtures are mounted on Holy Cross wood poles, either primary or secondary. Source or reference: http://www.holycross.com/about-us/rates-charges Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Data:260e0a75-a7ec-43b1-90d4-0346e2ab598d | Open Energy Information  

Open Energy Info (EERE)

a75-a7ec-43b1-90d4-0346e2ab598d a75-a7ec-43b1-90d4-0346e2ab598d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers' Electric Coop, Inc (New Mexico) Effective date: 2010/05/01 End date if known: Rate name: Small Commercial Facility Charge Sector: Commercial Description: Source or reference: Rate Binder#8 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2

282

Data:57c32bbc-4a0f-44ee-9b5b-1b47910003a0 | Open Energy Information  

Open Energy Info (EERE)

2bbc-4a0f-44ee-9b5b-1b47910003a0 2bbc-4a0f-44ee-9b5b-1b47910003a0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Coop Effective date: 2011/04/01 End date if known: Rate name: Rate Schedule chc Controlled Heating and Cooling Sector: Commercial Description: Available to cooperative members for electric space heating, electric central air conditioning and electric water heating for residences and commercial offices and monthly demand less than one hundred kilowatts. Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW)

283

Data:F5bceb0c-f890-42eb-92df-78b1ea991d60 | Open Energy Information  

Open Energy Info (EERE)

bceb0c-f890-42eb-92df-78b1ea991d60 bceb0c-f890-42eb-92df-78b1ea991d60 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Walton Electric Member Corp Effective date: 2006/06/01 End date if known: Rate name: 20' F/G Sector: Lighting Description: Source or reference: http://www.waltonemc.com/commercial/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

284

Data:C4926f4d-686c-458b-b1d4-697550f9b815 | Open Energy Information  

Open Energy Info (EERE)

d-686c-458b-b1d4-697550f9b815 d-686c-458b-b1d4-697550f9b815 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lenoir, Tennessee (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: GSA2 Sector: Commercial Description: Source or reference: http://www.lcub.com/electric/SitePages/erates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

285

Data:3f038ae0-f333-4afd-8558-1f35b1b6e2ef | Open Energy Information  

Open Energy Info (EERE)

8ae0-f333-4afd-8558-1f35b1b6e2ef 8ae0-f333-4afd-8558-1f35b1b6e2ef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Russellville, Kentucky (Utility Company) Effective date: End date if known: Rate name: 1000W Metal Halide Sector: Lighting Description: Source or reference: http://www.russepb.com/rates.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

286

Data:Ad5780b1-32c5-49e4-864f-021c918c00f8 | Open Energy Information  

Open Energy Info (EERE)

b1-32c5-49e4-864f-021c918c00f8 b1-32c5-49e4-864f-021c918c00f8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No4 Pinal Cnty Effective date: 2009/01/01 End date if known: Rate name: Canal Gates Rate Sector: Commercial Description: Applicable for all slide gate controlled check structure on the distribution system of the Central Arizona Irrigation and Drainage District or Maricopa-Stanfield Irrigation and Drainage District. Flat rate of $14.50 per installation Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

287

Data:0195b1f5-f57f-48d4-b651-18937b4f277f | Open Energy Information  

Open Energy Info (EERE)

b1f5-f57f-48d4-b651-18937b4f277f b1f5-f57f-48d4-b651-18937b4f277f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pataula Electric Member Corp Effective date: 1997/12/01 End date if known: Rate name: Schedule FM - Farm and Home Service Sector: Residential Description: Available to members of the Corporation for all farm and home users subject to the established Rules and Regulations of the Cooperative. Service under this schedule is limited to individual motors up to and including ten (10) horsepower. Source or reference: http://facts.psc.state.ga.us/Public/GetDocument.aspx?ID=128532 Source Parent:

288

Data:2924d044-a548-477a-aae1-5cb218b743b1 | Open Energy Information  

Open Energy Info (EERE)

-a548-477a-aae1-5cb218b743b1 -a548-477a-aae1-5cb218b743b1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pontotoc Electric Power Assn Effective date: 2013/07/01 End date if known: Rate name: Flood Light MH 400 W Sector: Lighting Description: Source or reference: http://www.sitemason.com/files/fjDo1q/May%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

289

Data:Afa862c6-11b1-43cb-aedd-ca3196cf8972 | Open Energy Information  

Open Energy Info (EERE)

Afa862c6-11b1-43cb-aedd-ca3196cf8972 Afa862c6-11b1-43cb-aedd-ca3196cf8972 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coldwater Board of Public Util Effective date: 2011/09/01 End date if known: Rate name: Commercial and Industrial Primary Service Rate "D" Sector: Industrial Description: Open to any customer desiring primary voltage service for Commercial or Industrial use where the billing demand is 25 KW or more. Source or reference: http://www.coldwater.org/Content/Utility_Services.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

290

Data:Dab34561-0fa8-43ac-96e9-c942880226b1 | Open Energy Information  

Open Energy Info (EERE)

Dab34561-0fa8-43ac-96e9-c942880226b1 Dab34561-0fa8-43ac-96e9-c942880226b1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Coop Effective date: 2009/01/01 End date if known: Rate name: Rate Schedule SL (Security Lighting) (Directional Fixtures 100 Watt HPS) Sector: Lighting Description: Available to all cooperative members. Directional fixtures 100 watt HPS Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

291

Data:9e34e8b1-ad63-4a80-aaab-a6c228c0781b | Open Energy Information  

Open Energy Info (EERE)

e8b1-ad63-4a80-aaab-a6c228c0781b e8b1-ad63-4a80-aaab-a6c228c0781b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clay Electric Cooperative, Inc Effective date: 2011/01/01 End date if known: Rate name: Rate Schedule - LGSDT/LM Sector: Industrial Description: At the option of the consumer, to electric service which would otherwise be provided under the Cooperative's Schedule LGSD. Renewable generating systems are not to be rated higher than 100 kW AC for the purpose of net metering. Source or reference: https://www.clayelectric.com/rates.aspx Source Parent: Comments Plus current month's Power Cost Adjustment and applicable taxes.

292

Data:Cde245d1-8107-462e-8237-ab32cb64d3b1 | Open Energy Information  

Open Energy Info (EERE)

Cde245d1-8107-462e-8237-ab32cb64d3b1 Cde245d1-8107-462e-8237-ab32cb64d3b1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bay City, Michigan (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: COMPANY-OWNED STREET LIGHTING (Mercury Vapor - 175 watts) Sector: Lighting Description: Mercury Vapor - 175 watts Source or reference: http://www.baycitymi.org/images/Department/electric/pdf/Electric%20Service%20Rate%20Schedule.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

293

Data:Fe52bfa0-ff17-45c6-b1a0-e9cafe7cef10 | Open Energy Information  

Open Energy Info (EERE)

bfa0-ff17-45c6-b1a0-e9cafe7cef10 bfa0-ff17-45c6-b1a0-e9cafe7cef10 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Howard Greeley Rural P P D Effective date: End date if known: Rate name: Village Miscellaneous Single Phase Demand Sector: Commercial Description: Source or reference: Illinois State University Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

294

Data:E12be451-7f27-4e8b-82b1-616ac88c8295 | Open Energy Information  

Open Energy Info (EERE)

51-7f27-4e8b-82b1-616ac88c8295 51-7f27-4e8b-82b1-616ac88c8295 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Frankfort, Kentucky (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Rate S1- Security Lights- (100W HPS) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

295

Data:6eb0361a-9747-4102-a268-4913ba6b1a93 | Open Energy Information  

Open Energy Info (EERE)

361a-9747-4102-a268-4913ba6b1a93 361a-9747-4102-a268-4913ba6b1a93 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Washington Elec Member Corp Effective date: End date if known: Rate name: 250 Watt HPS Flood Sector: Lighting Description: Source or reference: http://facts.psc.state.ga.us/Public/GetDocument.aspx?ID=129296 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

296

Data:92498fc1-eca1-47a3-9c05-b1fc5cc59951 | Open Energy Information  

Open Energy Info (EERE)

eca1-47a3-9c05-b1fc5cc59951 eca1-47a3-9c05-b1fc5cc59951 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Smyrna Beach, Florida (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: HPS-Cobra 150 watts Sector: Lighting Description: Fixed Monthly Charge= Energy Rate + Maintenance Source or reference: http://ucnsb.org/pdf/Rates%20Charges%20and%20Fees.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

297

Data:B25154b0-4e95-48b1-b9dc-633f4140099b | Open Energy Information  

Open Energy Info (EERE)

b0-4e95-48b1-b9dc-633f4140099b b0-4e95-48b1-b9dc-633f4140099b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: A & N Electric Coop Effective date: 2008/01/02 End date if known: Rate name: Former Delmarva Power Territory: Private Area Lighting-Enclosed Bottom-High Pressure Sodium-150W Sector: Lighting Description: Estimated Average Monthly Usage: 71kWh Rates are subject to wholesale power cost adjustments. Terms and conditions apply. Source or reference: http://www.anec.com/yourbill/rate_pdfs/AST_PL.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

298

Data:1b77e18e-6786-46e6-b1f8-a0f330d9b3ce | Open Energy Information  

Open Energy Info (EERE)

e-6786-46e6-b1f8-a0f330d9b3ce e-6786-46e6-b1f8-a0f330d9b3ce No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anoka, Minnesota (Utility Company) Effective date: 2009/01/01 End date if known: Rate name: Interruptible Rate (Over 500KW) Sector: Industrial Description: Over 500 KW Source or reference: Rate Binder Kelly 3 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

299

Data:72f3245c-2abd-4e26-8f6a-231769b1b0aa | Open Energy Information  

Open Energy Info (EERE)

45c-2abd-4e26-8f6a-231769b1b0aa 45c-2abd-4e26-8f6a-231769b1b0aa No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cleco Power LLC Effective date: 2011/02/01 End date if known: Rate name: Customer-Owned Fixture - Cobra Head 250 Watt HPS Dark Skies Adder Sector: Lighting Description: Source or reference: www.cleco.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

300

Data:Fd05f460-25b7-46f9-97b1-b8c181401fe4 | Open Energy Information  

Open Energy Info (EERE)

60-25b7-46f9-97b1-b8c181401fe4 60-25b7-46f9-97b1-b8c181401fe4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of West Point, Mississippi (Utility Company) Effective date: 2012/11/01 End date if known: Rate name: General Power Service- GSA 2 Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Data:1ee9569d-8337-4c2b-93d1-5b1d58138b57 | Open Energy Information  

Open Energy Info (EERE)

d-8337-4c2b-93d1-5b1d58138b57 d-8337-4c2b-93d1-5b1d58138b57 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Natchez Trace Elec Power Assn Effective date: End date if known: Rate name: Outdoor Lighting MV 400 W Dedicated Pole Sector: Lighting Description: Source or reference: http://www.ntepa.com/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

302

Data:D8f17bd4-b6b1-4602-9ddf-65f907b8e2bf | Open Energy Information  

Open Energy Info (EERE)

b6b1-4602-9ddf-65f907b8e2bf b6b1-4602-9ddf-65f907b8e2bf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: MidAmerican Energy Co Effective date: 2006/03/06 End date if known: Rate name: Private Lighting - North - 1000W HPS - Billed Use Sector: Lighting Description: Source or reference: www.midamericanenergy.com/include/pdf/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

303

Data:2038a5b5-d534-4c54-99b1-9750bfbc7736 | Open Energy Information  

Open Energy Info (EERE)

a5b5-d534-4c54-99b1-9750bfbc7736 a5b5-d534-4c54-99b1-9750bfbc7736 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lompoc, California (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Induction and LED Street Lighting- (71.4 LED) Sector: Lighting Description: This schedule is applicable to Utility owned and maintained lighting installations which illuminate streets and other publicly dedicated outdoor ways; and places and which generally utilize the Utility's distribution lines. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW)

304

Data:59005502-b1e8-471d-8bbb-bf7e33133cb0 | Open Energy Information  

Open Energy Info (EERE)

02-b1e8-471d-8bbb-bf7e33133cb0 02-b1e8-471d-8bbb-bf7e33133cb0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Klickitat County Effective date: 2013/04/01 End date if known: Rate name: Street Lighting Schedule 6 HPS 1000w Sector: Lighting Description: Applicable to service for street lighting systems, including street lighting, signal systems and roadway and park lighting for a term of not less than ten years. Source or reference: http://www.klickitatpud.com/ratesAndPolicies/electricRates/rateSchedule6.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

305

Data:B4a20f57-ff5f-4407-b7b1-37ed943d1045 | Open Energy Information  

Open Energy Info (EERE)

7-ff5f-4407-b7b1-37ed943d1045 7-ff5f-4407-b7b1-37ed943d1045 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Orrville, Ohio (Utility Company) Effective date: 2006/01/01 End date if known: Rate name: 150 Watt High Pressure Sodium Lamp Metered Sector: Lighting Description: Source or reference: http://www.orrutilities.com/electric/rates.shtml Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

306

Data:72c4cfe7-d6df-4667-b1ad-2277a492e8b3 | Open Energy Information  

Open Energy Info (EERE)

cfe7-d6df-4667-b1ad-2277a492e8b3 cfe7-d6df-4667-b1ad-2277a492e8b3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Springfield, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Street Lighting 135 W LPS Opt.1 L-1 Sector: Lighting Description: Option 1 refers to a Customer owned and installed fixture. The fixed monthly charge covers energy, operation and fixture maintenance fees. Possible Additional Fees include: Transfer of a street light, mast arm, overhead conductor, and conductor support to a new pole, and make necessary electrical connection: $175 each.

307

Data:57e459ed-b1d4-4ce6-8fff-5125895a4fc5 | Open Energy Information  

Open Energy Info (EERE)

b1d4-4ce6-8fff-5125895a4fc5 b1d4-4ce6-8fff-5125895a4fc5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jackson Electric Member Corp Effective date: End date if known: Rate name: Outdoor Lighting Decashield HPS 400 W Wood Pole Sector: Lighting Description: Source or reference: http://www.jacksonemc.com/business-manage-my-account-commercial-rates-options/schedules/outdoor-lighting-service Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

308

Data:13723287-b1c9-48f8-b317-a1d32e15837e | Open Energy Information  

Open Energy Info (EERE)

-b1c9-48f8-b317-a1d32e15837e -b1c9-48f8-b317-a1d32e15837e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pioneer Electric Coop, Inc (Alabama) Effective date: 2012/03/27 End date if known: Rate name: Large Industrial Sector: Industrial Description: *Available to a new consumer with new load or an existing consumer that expands its facilities or operations resulting in new load, for all electric service provided at one point of delivery with peak demand requirements of 3,000 kW or more. Source or reference: http://www.pioneerelectric.coop/documents/tariff-schedules.pdf Source Parent:

309

Data:Ec1d5b98-b682-4077-b1bc-62618b5e2914 | Open Energy Information  

Open Energy Info (EERE)

b98-b682-4077-b1bc-62618b5e2914 b98-b682-4077-b1bc-62618b5e2914 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: 2013/06/01 End date if known: Rate name: Small Commercial Churches and Schools(K20A) Sector: Commercial Description: Small commercial rate for commercial customer with monthly demands less than 10 KWD. Source or reference: http://publicutilities.columbus.gov/WorkArea/linkit.aspx?LinkIdentifier=id&ItemID=45273 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

310

Data:A5b60c82-0984-463b-b1a7-1f6929ae4a40 | Open Energy Information  

Open Energy Info (EERE)

c82-0984-463b-b1a7-1f6929ae4a40 c82-0984-463b-b1a7-1f6929ae4a40 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Acworth, Georgia (Utility Company) Effective date: 2010/04/01 End date if known: Rate name: Institutional Demand Service Sector: Commercial Description: For government owned and operated buildings and government owned and operated recreational facilities, churches, schools, and civic orginizations receiving power at one standard voltage, delivered at one point and where the average monthly energy usage is greater than 3,000 kWh. Source or reference: ISU Documents Source Parent:

311

Data:3ecc9741-c5aa-44b1-bce8-97d4a21a26d4 | Open Energy Information  

Open Energy Info (EERE)

741-c5aa-44b1-bce8-97d4a21a26d4 741-c5aa-44b1-bce8-97d4a21a26d4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Readsboro, Vermont (Utility Company) Effective date: 2012/08/01 End date if known: Rate name: Customer-Owned Lamps - 100 Watt Sector: Lighting Description: Source or reference: wwww.greenmountainpower.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

312

Data:Dc053106-bce8-4fb3-b1e2-51ee2ed3a966 | Open Energy Information  

Open Energy Info (EERE)

53106-bce8-4fb3-b1e2-51ee2ed3a966 53106-bce8-4fb3-b1e2-51ee2ed3a966 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coldwater Board of Public Util Effective date: 2011/09/01 End date if known: Rate name: Outdoor Lighting Service - 175 W MV Sector: Lighting Description: Available for outdoor lighting to any Coldwater Board of Public Utilities customer upon proper contract execution. Source or reference: http://www.coldwater.org/Content/Utility_General_Info.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

313

Data:46b02614-4695-4d73-8b1e-7d6209790a63 | Open Energy Information  

Open Energy Info (EERE)

4695-4d73-8b1e-7d6209790a63 4695-4d73-8b1e-7d6209790a63 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Elec & Gas Co Effective date: 2010/06/07 End date if known: Rate name: 100W ACORN DECORATIVE H.P Sector: Lighting Description: Source or reference: http://www.pseg.com/family/pseandg/tariffs/electric/pdf/electric_tariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

314

Data:Ad5917ff-b1d9-4848-bffc-f806a6f31a48 | Open Energy Information  

Open Energy Info (EERE)

ff-b1d9-4848-bffc-f806a6f31a48 ff-b1d9-4848-bffc-f806a6f31a48 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eugene, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: J-4 (Customer-Owned Street Lighting Service) 35 Watt High Pressure Sodium Sector: Lighting Description: To governmental agency, lighting district, and water district-owned daily, dusk-to-dawn lighting systems which illuminate streets, alleys, and thoroughfares used primarily for motorized vehicular traffic and which meet EWEB's specifications. Source or reference: http://www.eweb.org/public/documents/policies/electric5.pdf

315

Data:Cd0e081d-b1af-4053-9cef-a174cc6ade14 | Open Energy Information  

Open Energy Info (EERE)

1d-b1af-4053-9cef-a174cc6ade14 1d-b1af-4053-9cef-a174cc6ade14 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Winnsboro, South Carolina (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Large Power Service Sector: Commercial Description: Non residential with monthly demand over 125 kVa. Source or reference: ISU Documentation Rate Binder Ted #12 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

316

Data:3aefb3b1-682a-458f-94ff-ea39d622e631 | Open Energy Information  

Open Energy Info (EERE)

aefb3b1-682a-458f-94ff-ea39d622e631 aefb3b1-682a-458f-94ff-ea39d622e631 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Crisp County Power Comm Effective date: 2012/04/01 End date if known: Rate name: Farm Service Sector: Commercial Description: Applicable to individually owned farms facilities when used in the production of livestock, poultry, and other agricultural products. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

317

Data:E308497f-b2b1-4b50-83a6-f666787afdc0 | Open Energy Information  

Open Energy Info (EERE)

f-b2b1-4b50-83a6-f666787afdc0 f-b2b1-4b50-83a6-f666787afdc0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lompoc, California (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Outdoor Area Lighting Service- (70W HPS) Sector: Lighting Description: This schedule applies to outdoor area lighting service for the illumination of areas when street and highway lighting schedules do not apply and when the Utility installs, owns, operates, and maintains the complete lighting installation. Source or reference: ISU Documentation Source Parent: Comments Applicability

318

Data:497ee8ee-9481-4c78-b1be-f5a4c554cd4a | Open Energy Information  

Open Energy Info (EERE)

ee8ee-9481-4c78-b1be-f5a4c554cd4a ee8ee-9481-4c78-b1be-f5a4c554cd4a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bandon, Oregon (Utility Company) Effective date: End date if known: Rate name: City Use Small Commercial Single Phase- Outside City Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

319

Data:E96dc2d1-abdc-4cde-bd0d-b1ada38fdae7 | Open Energy Information  

Open Energy Info (EERE)

d1-abdc-4cde-bd0d-b1ada38fdae7 d1-abdc-4cde-bd0d-b1ada38fdae7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Austin Energy Effective date: 2012/10/01 End date if known: Rate name: City of Austin - Owned Outdoor Lighting - 400 W Mercury Vapor Sector: Description: Power Supply Adjustment fee - plus an adjustment for variable costs, calculated under the Power Supply Adjustment rate schedule , multiplied by the billable kWh. Source or reference: www.austinenergy.com/About Us/Rates/index.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

320

Data:D8db6ab4-d488-474b-b5b1-acbe8d31989b | Open Energy Information  

Open Energy Info (EERE)

ab4-d488-474b-b5b1-acbe8d31989b ab4-d488-474b-b5b1-acbe8d31989b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hawaiian Electric Co Inc Effective date: 2013/07/04 End date if known: 2018/06/30 Rate name: Schedule EV-F - Commercial Public Electric Vehicle Charging Facility Service Pilot Sector: Commercial Description: Source or reference: http://hawaiianelectric.com/vcmcontent/StaticFiles/FileScan/PDF/EnergyServices/Tarrifs/HECO/HECORatesEV-F.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Data:5138fe97-ed01-4cf4-a567-b375b1a6ed5f | Open Energy Information  

Open Energy Info (EERE)

7-ed01-4cf4-a567-b375b1a6ed5f 7-ed01-4cf4-a567-b375b1a6ed5f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Wakefield, Michigan (Utility Company) Effective date: 2007/03/01 End date if known: Rate name: Water Heating Sector: Residential Description: Source or reference: Rate Binder Kelly 3 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

322

Data:82eeee47-02b1-4c84-b813-ccfa73a6bdf3 | Open Energy Information  

Open Energy Info (EERE)

eeee47-02b1-4c84-b813-ccfa73a6bdf3 eeee47-02b1-4c84-b813-ccfa73a6bdf3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Arrowhead Electric Coop, Inc Effective date: 2012/07/17 End date if known: Rate name: Choice/Gold Sector: Description: Closed to New Customers Source or reference: Illinois State University Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

323

Data:B23a23c8-b799-4b22-af67-b1eea4a01a12 | Open Energy Information  

Open Energy Info (EERE)

c8-b799-4b22-af67-b1eea4a01a12 c8-b799-4b22-af67-b1eea4a01a12 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Altamont, Kansas (Utility Company) Effective date: 2008/12/30 End date if known: Rate name: Industrial Power Sector: Industrial Description: Source or reference: Ted Binder 2 Source Parent: Comments Does not include the energy cost of electricity supplied to the city of altamont. Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

324

Data:5afd4777-9c31-4ed0-b1de-03159a241ebb | Open Energy Information  

Open Energy Info (EERE)

afd4777-9c31-4ed0-b1de-03159a241ebb afd4777-9c31-4ed0-b1de-03159a241ebb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Blue Grass Energy Coop Corp Effective date: 2011/06/01 End date if known: Rate name: GS 1- Residential & Farm Sector: Residential Description: AVAl LABILITY Available to all residential and farm consumers. The capacity on individual motors served under this schedule may not exceed ten (1 0) horsepower. Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Rates%20Collected/Attachments/125/1%20COOP,%20KY,%20Blue%20Grass%20Energy%20Tariff-2.pdf

325

Data:0b65710c-13b1-47fd-bb90-71e7e33ec332 | Open Energy Information  

Open Energy Info (EERE)

0c-13b1-47fd-bb90-71e7e33ec332 0c-13b1-47fd-bb90-71e7e33ec332 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: High West Energy, Inc (Nebraska) Effective date: End date if known: Rate name: Security Lighting-200 - 250 watt M V/ HPS Sector: Lighting Description: Source or reference: http://www.highwest-energy.com/public/index.php/custservices/content-all-comcontent-views/rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

326

Data:12a1bed7-432b-4810-83de-351ba5b1d371 | Open Energy Information  

Open Energy Info (EERE)

-432b-4810-83de-351ba5b1d371 -432b-4810-83de-351ba5b1d371 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tipton Municipal Electric Util Effective date: 2004/08/13 End date if known: Rate name: Rate E- Outdoor Lighting Service: 400 Watt Metal Halide Sector: Lighting Description: Add $1.15 per month, if pole installation is required. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

327

Data:B0f9e913-f2b1-4582-bee1-7d9961353360 | Open Energy Information  

Open Energy Info (EERE)

3-f2b1-4582-bee1-7d9961353360 3-f2b1-4582-bee1-7d9961353360 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Jackson, Tennessee (Utility Company) Effective date: 2012/06/01 End date if known: Rate name: Manufacturing Service SMSD Sector: Commercial Description: Source or reference: http://www.jaxenergy.com/rates/downloads/ELECTRIC_R.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

328

Data:6d4d7f21-31f9-4583-b1c0-5104c83076a5 | Open Energy Information  

Open Energy Info (EERE)

31f9-4583-b1c0-5104c83076a5 31f9-4583-b1c0-5104c83076a5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp Effective date: 2013/01/01 End date if known: Rate name: Area Lighting - DSV-100W Post Top Sector: Lighting Description: Public Purposes Rider = base rate x %2.85. Source or reference: http://www.avistautilities.com/services/energypricing/wa/elect/Pages/default.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

329

Data:Eecf7006-9d85-4c78-b1b4-dafc1995de10 | Open Energy Information  

Open Energy Info (EERE)

Eecf7006-9d85-4c78-b1b4-dafc1995de10 Eecf7006-9d85-4c78-b1b4-dafc1995de10 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Sylvania, Georgia (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: industrial Electric Over 500 Sector: Industrial Description: Source or reference: Rate Binder #2 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

330

Data:4b8a5523-bbba-48df-a22a-fb48b1c37a25 | Open Energy Information  

Open Energy Info (EERE)

bbba-48df-a22a-fb48b1c37a25 bbba-48df-a22a-fb48b1c37a25 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cornhusker Public Power Dist Effective date: 2012/01/01 End date if known: Rate name: Large Power Service "Central Sand and Gravel" Sector: Description: monthly chage= $0 as long as customer meets annual chage of $2820 Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

331

Data:A27b3192-e8da-41ab-8357-00b1ca3e3cf3 | Open Energy Information  

Open Energy Info (EERE)

92-e8da-41ab-8357-00b1ca3e3cf3 92-e8da-41ab-8357-00b1ca3e3cf3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Duncan, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- (250W SV on existing 30 ft. wood Pole- Overheard Wiring) Sector: Lighting Description: This rate schedule is available on an annual basis to any customer for illumination of outdoor areas. Source or reference: ISU Documentation Rate Binder Ted #9 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

332

Data:F1f8c508-c4b1-4348-82e0-feb30b4efda0 | Open Energy Information  

Open Energy Info (EERE)

8-c4b1-4348-82e0-feb30b4efda0 8-c4b1-4348-82e0-feb30b4efda0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Etna Green, Indiana (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Muncipal Service -Metered Demand- Single Phase Sector: Commercial Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

333

Data:453da994-5513-4adf-b1bb-d34c7eca4d5b | Open Energy Information  

Open Energy Info (EERE)

94-5513-4adf-b1bb-d34c7eca4d5b 94-5513-4adf-b1bb-d34c7eca4d5b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Story City, Iowa (Utility Company) Effective date: 2004/01/01 End date if known: Rate name: Mercury Vapor - 1000 Watt - Not metered Sector: Lighting Description: Source or reference: Ted Binder 1 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

334

Data:E6b1d114-9311-4332-8e3e-30061634d445 | Open Energy Information  

Open Energy Info (EERE)

b1d114-9311-4332-8e3e-30061634d445 b1d114-9311-4332-8e3e-30061634d445 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kenergy Corp Effective date: 2011/09/01 End date if known: Rate name: LED NEMA Head - 60 Watt Sector: Lighting Description: Source or reference: www.kenergycorp.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

335

Data:A709f323-e123-42f5-b6b1-be77220367c5 | Open Energy Information  

Open Energy Info (EERE)

3-e123-42f5-b6b1-be77220367c5 3-e123-42f5-b6b1-be77220367c5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Provo City Corp (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Private Outdoor Security Lighting- 250W Metal Halide Sector: Lighting Description: This schedule is available at any point on the Energy Department electric system where facilities of adequate capacity and standard lighting voltage levels are available. Source or reference: http://secure.provocitypower.com/Schedule%2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

336

Data:4a88561f-b1cf-4dc7-baec-9272b2d731c8 | Open Energy Information  

Open Energy Info (EERE)

561f-b1cf-4dc7-baec-9272b2d731c8 561f-b1cf-4dc7-baec-9272b2d731c8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rolling Hills Electric Coop Effective date: 2010/07/01 End date if known: Rate name: Private Street and Area Lighting (PSL-10) metered MV 175W Sector: Lighting Description: http://rollinghills.coopwebbuilder.com/sites/rollinghills.coopwebbuilder.com/files/rate_tariffs.pdf Source or reference: http://rollinghills.coopwebbuilder.com/sites/rollinghills.coopwebbuilder.com/files/rate_tariffs.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

337

Data:Fe67ad77-1274-4a15-86d9-16ac76b1e7ef | Open Energy Information  

Open Energy Info (EERE)

ad77-1274-4a15-86d9-16ac76b1e7ef ad77-1274-4a15-86d9-16ac76b1e7ef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeast Electric Coop, Inc Effective date: 2010/01/01 End date if known: Rate name: Commercial Three Phase Sector: Commercial Description: Source or reference: Rate Binder Kelly 11 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

338

Data:Bf2149b1-aed3-4daa-8b31-f0f1962c66d2 | Open Energy Information  

Open Energy Info (EERE)

Bf2149b1-aed3-4daa-8b31-f0f1962c66d2 Bf2149b1-aed3-4daa-8b31-f0f1962c66d2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Raton Public Service Company Effective date: End date if known: Rate name: Large Light and Power Sector: Industrial Description: To any commercial or industrial customer within the RPS service area with a demand of 50 kW or greater or more than 13,000 kWh per month for all usage, provided that the entire requirements are taken through one meter at the utility's standard secondary voltage and frequency. Source or reference: Rates Binder A Source Parent: Comments Applicability

339

Data:Be9ba20b-46dd-492c-9b1f-8e1d4f72c748 | Open Energy Information  

Open Energy Info (EERE)

0b-46dd-492c-9b1f-8e1d4f72c748 0b-46dd-492c-9b1f-8e1d4f72c748 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power Effective date: 2013/06/01 End date if known: Rate name: "SGS-ND" & "MGS-S" SH (UnBundled) Sector: Description: Source or reference: http://www.delmarva.com/_res/documents/DEMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

340

Data:591221f5-a1ca-49b1-a2d3-3c21d15acbf3 | Open Energy Information  

Open Energy Info (EERE)

f5-a1ca-49b1-a2d3-3c21d15acbf3 f5-a1ca-49b1-a2d3-3c21d15acbf3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Amicalola Electric Member Corp Effective date: End date if known: Rate name: Security Lights Flood 400 W Sector: Lighting Description: Source or reference: http://www.amicalolaemc.com/securitylights.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Data:7e26dcdf-b1f3-4062-8971-58a620e247e1 | Open Energy Information  

Open Energy Info (EERE)

dcdf-b1f3-4062-8971-58a620e247e1 dcdf-b1f3-4062-8971-58a620e247e1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Concord, Massachusetts (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: RATE G-1 THREE PHASE (SMALL GENERAL SERVICE) Sector: Commercial Description: Customer's maximum metered demand is less than 20.0 k W. Source or reference: http://www.concordma.gov/pages/ConcordMA_LightPlant/CMLP_new_rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

342

Data:0098ce8e-7d65-46b1-b3a0-d907346aa445 | Open Energy Information  

Open Energy Info (EERE)

ce8e-7d65-46b1-b3a0-d907346aa445 ce8e-7d65-46b1-b3a0-d907346aa445 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kit Carson Electric Coop, Inc Effective date: 2011/09/22 End date if known: Rate name: Residential Seasonal Service Sector: Residential Description: Available to all seasonal, residential consumers who require less than 50 kVA transformer capacity within the Utility's service area and who maintain residence in the same premise for less than 9 months or more per year. Source or reference: www.kitcarson.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

343

Data:Da52725b-1af6-46d4-8d76-e0c54d00e544 | Open Energy Information  

Open Energy Info (EERE)

5b-1af6-46d4-8d76-e0c54d00e544 5b-1af6-46d4-8d76-e0c54d00e544 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power (Maryland) Effective date: 2011/07/08 End date if known: Rate name: OUTDOOR LIGHTING "OL"Mercury Vapor 100W Sector: Lighting Description: there are many different classifications for different structures for lights. The monthly charge here is for the existing pole. Click on the link for other structures. Source or reference: http://www.delmarva.com/_res/documents/DPLMdMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

344

Data:2584292a-6b1d-4f33-a6b2-ea1a80447752 | Open Energy Information  

Open Energy Info (EERE)

2a-6b1d-4f33-a6b2-ea1a80447752 2a-6b1d-4f33-a6b2-ea1a80447752 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Modesto Irrigation District Effective date: 2013/04/01 End date if known: Rate name: Schedule SL - Lamp and Fixture on Existing Pole - 400 Watt MV Sector: Lighting Description: This section of this Schedule is applicable to all night lighting on the public streets, alleys, highways and parks for cities, lighting districts or other public bodies. Public outdoor area lighting for other than all night lighting is supplied under Rate Schedule GS. Source or reference: www.mid.org/tariffs/rates/SL_STREET_LIGHTING.pdf

345

Data:9d6adc8a-7a8b-4590-b1fb-3cd49c8a4402 | Open Energy Information  

Open Energy Info (EERE)

adc8a-7a8b-4590-b1fb-3cd49c8a4402 adc8a-7a8b-4590-b1fb-3cd49c8a4402 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Klickitat County Effective date: 2013/04/01 End date if known: Rate name: Street Lighting Schedule 6 Mercury Vapor Lights 350w Sector: Lighting Description: Applicable to service for street lighting systems, including street lighting, signal systems and roadway and park lighting for a term of not less than ten years. Source or reference: http://www.klickitatpud.com/ratesAndPolicies/electricRates/rateSchedule6.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW):

346

Data:7e6206b1-191f-4678-83e5-fcb4769d978f | Open Energy Information  

Open Energy Info (EERE)

6b1-191f-4678-83e5-fcb4769d978f 6b1-191f-4678-83e5-fcb4769d978f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Hastings, Nebraska (Utility Company) Effective date: 2009/01/01 End date if known: Rate name: Optional Electric Space Heating and Water Heating- Rural Non-Residential Sector: Commercial Description: To any non-residential customer for separately metered electric space heating and/or water heating for domestic ad building services. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

347

Data:F02a8bea-411b-41b1-9eae-e102f66c72b7 | Open Energy Information  

Open Energy Info (EERE)

F02a8bea-411b-41b1-9eae-e102f66c72b7 F02a8bea-411b-41b1-9eae-e102f66c72b7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Drexel, North Carolina (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Outdoor Lighting- Mercury Vapor Suburban- New Pole Served Underground Sector: Lighting Description: Available to the individual customer for lighting of private outdoor areas at locations on the Town's distribution system. Service under this Schedule may be withheld or disconnected at the option of the Town. Source or reference: Rates Binder A Source Parent: Comments

348

Data:457f1dfb-b1ec-4f20-8e91-87fc0ec38949 | Open Energy Information  

Open Energy Info (EERE)

dfb-b1ec-4f20-8e91-87fc0ec38949 dfb-b1ec-4f20-8e91-87fc0ec38949 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Alabama Power Co Effective date: 2009/01/01 End date if known: Rate name: 150W HIGH PRESSURE SODIUM CUT OFF Sector: Lighting Description: Source or reference: http://www.alabamapower.com/pricing/pdf/FPL.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

349

Data:E38799bc-9c3e-4850-84b1-7555d8d01408 | Open Energy Information  

Open Energy Info (EERE)

bc-9c3e-4850-84b1-7555d8d01408 bc-9c3e-4850-84b1-7555d8d01408 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Carroll Electric Member Corp Effective date: 2012/02/01 End date if known: Rate name: Traffic Light Metered Service- Traffic Signal Sector: Lighting Description: Source or reference: http://www.cemc.com/Files/TL-2%20Traffic%20Light.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

350

Data:3ae481f4-b1a1-425a-bcbd-e23bc3ea577c | Open Energy Information  

Open Energy Info (EERE)

f4-b1a1-425a-bcbd-e23bc3ea577c f4-b1a1-425a-bcbd-e23bc3ea577c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: MidAmerican Energy Co Effective date: 2006/03/06 End date if known: Rate name: Private Lighting - North - 1000W MV Sector: Lighting Description: Source or reference: www.midamericanenergy.com/include/pdf/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

351

Data:Cb2d96ad-d16b-4cc8-b1eb-1f06e653de8f | Open Energy Information  

Open Energy Info (EERE)

ad-d16b-4cc8-b1eb-1f06e653de8f ad-d16b-4cc8-b1eb-1f06e653de8f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers' Electric Coop, Inc (New Mexico) Effective date: 2010/05/01 End date if known: Rate name: Livestock/Non-Dom Wel Sector: Commercial Description: Source or reference: Rate Binder#8 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

352

Data:82c1e6db-4473-4da7-b1ac-2bea65060d9a | Open Energy Information  

Open Energy Info (EERE)

4473-4da7-b1ac-2bea65060d9a 4473-4da7-b1ac-2bea65060d9a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stanhope, Iowa (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Residential Rate #1 (Single Phase) Composite rate Sector: Residential Description: there is a composite rate and a tiered rate. Source or reference: see IRPS Binder "A" Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

353

Data:37dc8855-a24b-45d4-9b1e-21095c4b986e | Open Energy Information  

Open Energy Info (EERE)

855-a24b-45d4-9b1e-21095c4b986e 855-a24b-45d4-9b1e-21095c4b986e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lost River Electric Coop Inc Effective date: End date if known: Rate name: Farm and Home Service Sector: Commercial Description: Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3

354

Data:A60c81d4-dba7-4901-b1fe-f79ec6bda696 | Open Energy Information  

Open Energy Info (EERE)

1d4-dba7-4901-b1fe-f79ec6bda696 1d4-dba7-4901-b1fe-f79ec6bda696 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Richland Electric Coop Effective date: End date if known: Rate name: Controlled Water Heater Credit Sector: Residential Description: A $3.00 per month credit will be assessed to customers who qualify. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

355

Data:55f30c24-7146-4b1d-9719-121b27551df6 | Open Energy Information  

Open Energy Info (EERE)

-7146-4b1d-9719-121b27551df6 -7146-4b1d-9719-121b27551df6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cleveland, Ohio (Utility Company) Effective date: End date if known: Rate name: area lighting 1000 w mv floodlight Sector: Lighting Description: area lighting,1000 w mv,floodlight maximum 395 kwh per lamp Source or reference: http://www.cpp.org/CPP%20RRR%20ORDINANCE%20as%20of%2011-14-06.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

356

Data:Ba334976-2fec-436b-b40b-1b3adcea46cb | Open Energy Information  

Open Energy Info (EERE)

Ba334976-2fec-436b-b40b-1b3adcea46cb Ba334976-2fec-436b-b40b-1b3adcea46cb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Joe Wheeler Elec Member Corp Effective date: 2013/05/01 End date if known: Rate name: Outdoor Lighting Rate--Schedule LS Mercury Vapor of Incandescent (250w) Sector: Lighting Description: Available for service to street and park lighting systems, traffic signal systems, athletic field lighting installations, and outdoor lighting for individual customers. Service under this schedule is for a term of not less than 1 year. Source or reference: http://www.jwemc.org/rateforms.aspx

357

Data:3f7aa9d0-c149-4f35-b1fe-21f35c1f1604 | Open Energy Information  

Open Energy Info (EERE)

aa9d0-c149-4f35-b1fe-21f35c1f1604 aa9d0-c149-4f35-b1fe-21f35c1f1604 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anaheim, California (Utility Company) Effective date: 2012/09/12 End date if known: Rate name: Lighting- City-Owned System- 22,000 Lumen High Pressure Sodium Sector: Lighting Description: Applicable to outdoor area lighting service, other than street and highway lighting service, supplied from overhead lines where the Utility owns and maintains the area lighting equipment. Source or reference: http://www.anaheim.net/utilities/ElectricRules/SCHD-LO.pdf Source Parent:

358

Data:06c154b1-694c-424f-8826-6b1dc7ed5fc0 | Open Energy Information  

Open Energy Info (EERE)

4b1-694c-424f-8826-6b1dc7ed5fc0 4b1-694c-424f-8826-6b1dc7ed5fc0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eugene, Oregon (Utility Company) Effective date: 2012/05/01 End date if known: Rate name: G-2 (Medium General Service, Primary, Three Phase) Sector: Commercial Description: To electric service for commercial, industrial and public agency customers with monthly billing demands from 31 to 500 kilowatts. Service is applicable to customers with the average of the three highest monthly kW demands in a 12-month period falling between 31 and 500 kilowatts. Primary Service is available for customers who contract for 300 kilowatts or more at one point of delivery at approximately 12,000 volts. It is not available to customers inside the underground secondary network. All Primary Service shall be three-phase, 60-cycle, at 12,000 volts or higher at the option of EWEB. Service shall be furnished through one meter, at one point of delivery and at one voltage. Secondary Service applies to customers served below 12,000 volts. Rate schedules apply to the sale of electrical energy for the sole and exclusive use of the customer. The customer shall not resell electrical energy supplied by EWEB.

359

Data:15d5cf52-65e8-45b1-97b6-e169325f8b1e | Open Energy Information  

Open Energy Info (EERE)

cf52-65e8-45b1-97b6-e169325f8b1e cf52-65e8-45b1-97b6-e169325f8b1e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jacksonville Electric Authority Effective date: 2011/10/01 End date if known: Rate name: CS Curtailable Service Rider Option A Transmission Service 230000+ volts Discount Sector: Description: For service taken at 230000+ volts. To customers eligible for Rate Schedules SS or GSLD who have executed a Curtailable Service Agreement with JEA. The customer agrees during a period of requested curtailment to curtail a minimum load of 200 kW. All service hereunder will be rendered through a single metering installation. Resale of energy purchased under this rider is not permitted. JEA reserves the right to limit the total load served under this rider. Curtailable service under this rate schedule is subject to curtailment during any time period that electric power and energy delivered hereunder from JEA's available generating resources is required to a) maintain service to JEA's firm power customers and firm power sales commitments, or b) supply emergency interchange service to another utility for its firm load obligations only, and c) when the price of power available to JEA from other sources exceeds 30 cents per kWh. The following charges are applicable to the curtailable portion of the customer's load only. The kW demand and kWh consumption not exceeding the Contracted Non-Curtailable demand shall be billed according to the terms and conditions of the JEA's standard GSLD Rate Schedule.

360

NEWTON's Botany References  

NLE Websites -- All DOE Office Websites (Extended Search)

Botany References Botany References Do you have a great botany reference link? Please click our Ideas page. Featured Reference Links: Dave's Garden - Plant Database Dave's Garden - Plant Database Visit Dave's Garden with information and photos for 185,359 different plants! United States Department of Agriculture Plant Database USDA PLANTS Database The PLANTS Database provides standardized information about the vascular plants, mosses, liverworts, hornworts, and lichens of the U.S. and its territories. Search over 40,000 plant images of US plants. Botany.com Botany.com Botany.com offers an encyclopedia of flowers and plants and resources to help people learn how to identify any different kinds of plants. Plant Kingdom This is a good reference for looking at the plant kingdom.

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

NEWTON's General Science References  

NLE Websites -- All DOE Office Websites (Extended Search)

General Science References General Science References Do you have a great general science reference link? Please click our Ideas page. Featured Reference Links: First.gov Science and Technology First.gov Science and Technology This site, sponsered by the US Government provides reference links to topics on science, telecommunications, computers, research agencies, and news. NASA Science NASA Science NASA Science, is a website sponsered by NASA, that supplies resources for understanding our world and the world above. Topics include earth science, heliophysics, the planets, astrophysics and much more. There is also an educator page! Nobel Laueate Listings and Stories Nobel Laueate Listings and Stories See the official site for the Nobel Prize, and read biographies about all of the Nobel Laureates, and there life changing discoveries and accomplishments.

362

Microgrid cyber security reference architecture.  

SciTech Connect

This document describes a microgrid cyber security reference architecture. First, we present a high-level concept of operations for a microgrid, including operational modes, necessary power actors, and the communication protocols typically employed. We then describe our motivation for designing a secure microgrid; in particular, we provide general network and industrial control system (ICS)-speci c vulnerabilities, a threat model, information assurance compliance concerns, and design criteria for a microgrid control system network. Our design approach addresses these concerns by segmenting the microgrid control system network into enclaves, grouping enclaves into functional domains, and describing actor communication using data exchange attributes. We describe cyber actors that can help mitigate potential vulnerabilities, in addition to performance bene ts and vulnerability mitigation that may be realized using this reference architecture. To illustrate our design approach, we present a notional a microgrid control system network implementation, including types of communica- tion occurring on that network, example data exchange attributes for actors in the network, an example of how the network can be segmented to create enclaves and functional domains, and how cyber actors can be used to enforce network segmentation and provide the neces- sary level of security. Finally, we describe areas of focus for the further development of the reference architecture.

Veitch, Cynthia K.; Henry, Jordan M.; Richardson, Bryan T.; Hart, Derek H.

2013-07-01T23:59:59.000Z

363

Wilderness Preservation : a Reference Handbook  

E-Print Network (OSTI)

Preservation: A Reference Handbook By Kenneth A. RossenbergPreservation: A Reference Handbook. Santa Barbara: ABC-CLIO,Preservation: A Reference Handbook is a comprehensive

Zimmer, Peter

1996-01-01T23:59:59.000Z

364

Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure - appendices. Final report  

SciTech Connect

The NRC staff is in need of decommissioning bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s Washington Nuclear Plant Two (WNP-2) located at Richland, Washington, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not presently part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clear structures on the site and to restore the site to a {open_quotes}green field{close_quotes} condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low-level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities. Sensitivity of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances is also examined.

Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.; McDuffie, P.N.

1996-07-01T23:59:59.000Z

365

Revised analyses of decommissioning for the reference boiling water reactor power station. Effects of current regulatory and other considerations on the financial assurance requirements of the decommissioning rule and on estimates of occupational radiation exposure - main report. Final report  

SciTech Connect

The NRC staff is in need of updated bases documentation that will assist them in assessing the adequacy of the licensee submittals, from the viewpoint of both the planned actions, including occupational radiation exposure, and the probable costs. The purpose of this reevaluation study is to update the needed bases documentation. This report presents the results of a review and reevaluation of the PNL 1980 decommissioning study of the Washington Public Power Supply System`s Washington Nuclear Plant Two (WNP-2), which is a boiling water reactor (BWR), located at Richland, Washington, including all identifiable factors and cost assumptions which contribute significantly to the total cost of decommissioning the plant for the DECON, SAFSTOR, and ENTOMB decommissioning alternatives. These alternatives now include an initial 5-7 year period during which time the spent fuel is stored in the spent fuel pool prior to beginning major disassembly or extended safe storage of the plant. Included for information (but not part of the license termination cost) is an estimate of the cost to demolish the decontaminated and clean structures on the site and to restore the site to a {open_quotes}green field{close_quotes} condition. This report also includes consideration of the NRC requirement that decontamination and decommissioning activities leading to termination of the nuclear license be completed within 60 years of final reactor shutdown, consideration of packaging and disposal requirements for materials whose radionuclide concentrations exceed the limits for Class C low- level waste (i.e., Greater-Than-Class C), and reflects 1993 costs for labor, materials, transport, and disposal activities. Sensitivity of the total license termination cost to the disposal costs at different low-level radioactive waste disposal sites, to different depths of contaminated concrete surface removal within the facilities, and to different transport distances is also examined.

Smith, R.I.; Bierschbach, M.C.; Konzek, G.J.; McDuffie, P.N.

1996-07-01T23:59:59.000Z

366

NEWTON's Molecular Biology References  

NLE Websites -- All DOE Office Websites (Extended Search)

Molecular Biology References Molecular Biology References Do you have a great reference link? Please click our Ideas page. Featured Reference Links: The Vitual Museum of Bacteria The Vitual Museum of Bacteria Visit the virtual museum of bacteria to learn more about bacteria and germs! This site brings together many links on bacteria, bacteriology, and related topics available on the web. It also provides crystal-clear information about many aspects of bacteria. The American Society of Cell Biology Cell Biology Educational Resources This site, sponsered by the American Society of Cell Biology, provides additional web links to everything from, general educational sites, to biology course materials, to teaching tools and more. National Center for Biotechnology Information National Center for Biotechnology Information

367

Transforming Definitions of Reference  

E-Print Network (OSTI)

“Four components of reference service: 1. Instruct the reader in the ways of the library. 2. Assist readers in solving their inquiries. 3. Aid the reader in the selection of good works. 4. Promote the library within the community.” Green, S.S. (1876). Personal relations between librarian and readers. American Library Journal, 1, 74-81. 1943 “Reference work. 1. That phase of library work which is directly concerned with assistance to readers in securing information and in using the resources of the library in study and research. 2. The work of a reference department.” American Library Association. Committee on Library Terminology. (1943). A.L.A. glossary of library terms, with a selection of terms in related fields. Chicago: American Library Association. 1982 “Reference transaction An information contact which involves the use, recommendation, interpretation, or instruction in the use of one or more information sources, or knowledge of such

unknown authors

2008-01-01T23:59:59.000Z

368

References to Astrophysics Papers  

NLE Websites -- All DOE Office Websites (Extended Search)

References to Astrophysics Papers References to Astrophysics Papers References to Astrophysics Papers Edward Tufte claims the most common number of references to scientific papers is zero. My five papers in astrophysics published from 1992 to 1996 continue to receive citations. Major ones are listed below. Mineo, S.; Rappaport, S.; Steinhorn, B.; Levine, A.; Gilfanov, M.; Pooley, D., 2013, The Astrophysical Journal, Volume 771, Issue 2, article id. 133, 12 pp. Spatially Resolved Star Formation Image and the Ultraluminous X-Ray Source Population in NGC 2207/IC 2163 Junqueira, T. C.; LĂ©pine, J. R. D.; Braga, C. A. S.; Barros, D. A 2013, Astronomy & Astrophysics, Volume 550, id.A91. A new model for gravitational potential perturbations in disks of spiral galaxies. An application to our Galaxy.

369

NEWTON's References About Mathematics  

NLE Websites -- All DOE Office Websites (Extended Search)

Math References Math References Do you have a great math reference link? Please click our Ideas page. Featured Reference Links: Steve Marsden's Chemistry Resources Discovery Education's Mathematics Guide Discovery Educators have provided a Mathematics Guide for Educators. Included are numerous links to sites that touch on almost every mathematic topic that you are interested in. The Ultimate Math Portal The Ultimate Math Portal Whether you are confused by multiplication, need extra practice with geometry proofs, find yourself struggling to understand logarithms, or you just want to know more about pi, you are sure to find what you need with this great list of math facts and resources. MathIsFun.com MathIsFun.com Here, math is explained in easy language, for your students to understand. Plus, there are puzzles, games, quizzes, worksheets and a forum for more exploration. This site is designed for K-12 kids, teachers and parents to enjoy.

370

NEWTON's Material Science References  

NLE Websites -- All DOE Office Websites (Extended Search)

Material Science References Material Science References Do you have a great material science reference link? Please click our Ideas page. Featured Reference Links: Materials Research Society Materials Research Society The Materials Research Society has assembled many resources in its Materials Science Enthusiasts site. This site has information for the K-12 audience, general public, and materials science professionals. Material Science nanoHUB nanHUB.org is the place for nanotechnology research, education, and collaboration. There are Simulation Programs, Online Presentations, Courses, Learning Modules, Podcasts, Animations, Teaching Materials, and more. (Intened for high school and up) Materials Science Resources on the Web Materials Science Resources on the Web This site gives a good general introduction into material science. Sponsered by Iowa State, it talks about what material science is, ceramics and composites, and other topics.

371

References - Energy Information Administration  

U.S. Energy Information Administration (EIA)

References 1.En ergy In for ma tion Ad min istra tion. Natu ral Gas Pro - duc tive Ca pac ity for the Lower 48 States 1980 through 1991 . DOE/EIA- 0542 (Wash ing ton ...

372

LLSIM Reference Manual  

E-Print Network (OSTI)

A program that simulates a Digital Equipment Corporation PDP-11 computer and many of its peripherals on the AI Laboratory Time Sharing System (ITS) is described from a user's reference point of view. This simulator has ...

Eastlake, Donald

1971-12-01T23:59:59.000Z

373

MIT Scheme Reference Manual  

E-Print Network (OSTI)

MIT Scheme is an implementation of the Scheme programming language that runs on many popular workstations. The MIT Scheme Reference Manual describes the special forms, procedures, and datatypes provided by the ...

Hanson, Chris

1991-01-01T23:59:59.000Z

374

LLSIM Reference Manual  

E-Print Network (OSTI)

A program that simulates a Digital Equipment Corporation PDP-11 computer and many of its peripherals on the AI Laboratory Time Sharing System (ITS) is described from a user's reference point of view. This simulator has ...

Eastlake, Donald E.

1972-02-01T23:59:59.000Z

375

Technical Reference OVERVIEW  

NLE Websites -- All DOE Office Websites (Extended Search)

and the ENERGY STAR Score in the United States and Canada Page 1 Parking and the ENERGY STAR Score in the United States and Canada Technical Reference OVERVIEW The ENERGY STAR...

376

L1157-B1: Water and ammonia as diagnostics of shock temperature  

E-Print Network (OSTI)

We investigate the origin and nature of the profiles of water and ammonia observ ed toward the L1157-B1 clump as part of the HIFI CHESS survey (Ceccarelli et al. 2010) using a new code coupling a gas-grain chemical model with a parametric shock model. Fir st results from the unbiased survey (Lefloch et al. 2010, Codella et al. 2010) reveal different molecular components at different excitation conditions coexisting in the B1 bow shock structure, with NH$_3$, H$_2$CO and CH$_3$OH emitting only at relatively low outflow velocities whereas H$_2$O shows bright emission at high velocities. Our model suggests that these differences are purely chemical and can be explained by the presence of a C-type shock whose maximum temperature must be close to 4000 K along the B1 clump.

Viti, S; Yates, J A; Codella, C; Vasta, M; Caselli, P; Lefloch, B; Ceccarelli, C

2011-01-01T23:59:59.000Z

377

L1157-B1: WATER AND AMMONIA AS DIAGNOSTICS OF SHOCK TEMPERATURE  

Science Conference Proceedings (OSTI)

We investigate the origin and nature of the profiles of water and ammonia observed toward the L1157-B1 clump as part of the HIFI CHESS survey using a new code coupling a gas-grain chemical model with a parametric shock model. First results from the unbiased survey reveal different molecular components at different excitation conditions coexisting in the B1 bow shock structure, with NH{sub 3}, H{sub 2}CO, and CH{sub 3}OH emitting only at relatively low outflow velocities whereas H{sub 2}O shows bright emission at high velocities. Our model suggests that these differences are purely chemical and can be explained by the presence of a C-type shock whose maximum temperature must be close to 4000 K along the B1 clump.

Viti, S.; Yates, J. A. [Department of Physics and Astronomy, University College London, Gower Street, London, WC1E 6BT (United Kingdom); Jimenez-Serra, I. [Harvard-Smithsonian Center for Astrophysics, 60 Garden Street, Cambridge, MA 02138 (United States); Codella, C.; Vasta, M.; Caselli, P. [INAF, Osservatorio Astrofisico di Arcetri, Largo E. Fermi 5, 50125, Firenze (Italy); Lefloch, B.; Ceccarelli, C., E-mail: sv@star.ucl.ac.uk [Laboratoire d'astrophysique de Grenoble, UMR 5571-CNRS, Universite Joseph Fourier, Grenoble (France)

2011-10-10T23:59:59.000Z

378

GRR/Elements/14-CA-b.1 - NPDES Permit Application | Open Energy Information  

Open Energy Info (EERE)

GRR/Elements/14-CA-b.1 - NPDES Permit Application GRR/Elements/14-CA-b.1 - NPDES Permit Application < GRR‎ | Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 14-CA-b.1 - NPDES Permit Application The National Pollutant Discharge Elimination System permit is filed using a Form 200 for discharges of any pollutant from a point source into a body of water. The application is submitted to the applicable RWQCB. Because there is a federal component of the NPDES process one or more additional forms may be required: Form 1 General information completed in conjunction with Forms 2B, 2C, 2D, 2E, 2F, Standard Form 2A Form 2A Publicly-Owned Treatment Works Form 2B Concentrated animal feeding operations and aquatic animal production facilities. New applications or renewals

379

NETL: Turbines - Reference Shelf  

NLE Websites -- All DOE Office Websites (Extended Search)

- Catalytic Combustion PDF-855KB 41892 - Praxair Final Report - Low NOx Fuel Flexible Gas Turbine PDF-214KB 42176 - GT 2006 Annual Report PDF-504KB 42495 - UTEP H2 Kinetics...

380

Basic mechanism for abrupt monsoon transitions Anders Levermanna,b,1  

E-Print Network (OSTI)

Basic mechanism for abrupt monsoon transitions Anders Levermanna,b,1 , Jacob Schewea,b , Vladimir 18, 2009 (received for review February 11, 2009) Monsoon systems influence the livelihood of hundreds strong and abrupt changes. Though details of monsoon circulations are complicated, obser- vations reveal

Levermann, Anders

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Liquid piston gas compression James D. Van de Ven a,*, Perry Y. Li b,1  

E-Print Network (OSTI)

Liquid piston gas compression James D. Van de Ven a,*, Perry Y. Li b,1 a Worcester Polytechnic piston Gas compression Air compressor Compression efficiency a b s t r a c t A liquid piston concept is proposed to improve the efficiency of gas compression and expansion. Because a liquid can conform

Li, Perry Y.

382

Directed evolution as a powerful synthetic biology tool Ryan E. Cobb a,b,1  

E-Print Network (OSTI)

Directed evolution as a powerful synthetic biology tool Ryan E. Cobb a,b,1 , Ning Sun c,1 , Huimin by Rihe Liu Keyword: Synthetic biology Directed evolution a b s t r a c t At the heart of synthetic of this approach. Directed evolution, a process which mimics Darwinian selection on a laboratory scale, has allowed

Zhao, Huimin

383

Combustion synthesis and nanomaterials Singanahally T. Aruna a,*, Alexander S. Mukasyan b,1  

E-Print Network (OSTI)

Combustion synthesis and nanomaterials Singanahally T. Aruna a,*, Alexander S. Mukasyan b,1 October 2008 Accepted 2 December 2008 Keywords: Combustion synthesis Self-propagating high-temperature synthesis Solution combustion Nanomaterials Catalysts Phosphors a b s t r a c t The recent developments

Mukasyan, Alexander

384

Study of dipion bottomonium transitions and search for the h(b)(1P) state  

E-Print Network (OSTI)

We study inclusive dipion decays using a sample of 108×10[superscript 6]?(3S) events recorded with the BABAR detector. We search for the decay mode ?(3S)??[superscript +]?[superscript -]h[subscript b](1P) and find no ...

Cowan, Ray Franklin

385

Evidence for the ?[subscript b](1S) Meson in Radiative ?(2S) Decay  

E-Print Network (OSTI)

We have performed a search for the ?[subscript b](1S) meson in the radiative decay of the ?(2S) resonance using a sample of 91.6×10[superscript 6] ?(2S) events recorded with the BABAR detector at the PEP-II B factory at ...

Zhao, M.

386

Quantitative NMR analysis of the protein G B1 domain in Xenopus laevis egg extracts  

E-Print Network (OSTI)

Quantitative NMR analysis of the protein G B1 domain in Xenopus laevis egg extracts and intact introduce a eukaryotic cellular system, the Xenopus laevis oocyte, for in-cell NMR analyses of biomolecules of in vivo NMR measurements in this cell type. This approach enables quantitative NMR experiments at defined

Ruderman, Joan

387

Quality Assurance REFERENCE GUIDE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Assurance Quality Assurance Qualification Standard DOE-STD-1150-2002 July 2012 Reference Guide The Functional Area Qualification Standard References Guides are developed to assist operators, maintenance personnel, and the technical staff in the acquisition of technical competence and qualification within the Technical Qualification Program. Please direct your questions or comments related to this document to the Office of Leadership and Career Management, Technical Qualification Program (TQP) Manager, Albuquerque Complex. This page is intentionally blank. Table of Contents i FIGURES ....................................................................................................................................... ii TABLES ........................................................................................................................................ iii

388

Multifunctional reference electrode  

DOE Patents (OSTI)

A multifunctional, low mass reference electrode of a nickel tube, thermocouple means inside the nickel tube electrically insulated therefrom for measuring the temperature thereof, a housing surrounding the nickel tube, an electrolyte having a fixed sulfide ion activity between the housing and the outer surface of the nickel tube forming the nickel/nickel sulfide/sulfide half-cell are described. An ion diffusion barrier is associated with the housing in contact with the electrolyte. Also disclosed is a cell using the reference electrode to measure characteristics of a working electrode.

Redey, L.; Vissers, D.R.

1981-12-30T23:59:59.000Z

389

TERMS OF REFERENCE  

E-Print Network (OSTI)

Act 2002 (the Act), hereby makes a reference to the CC for an investigation into the supply or acquisition of PH in the UK. 2. The OFT has reasonable grounds for suspecting that a feature or a combination of features of the market or markets for the supply or acquisition of PH prevents, restricts or distorts competition. 3. For the purposes of this reference, PH means privately funded healthcare services. These are services provided to patients via private facilities/clinics including private patient units, through the services of consultants, medical and clinical

John Fingleton

2012-01-01T23:59:59.000Z

390

Aluminum reference electrode  

DOE Patents (OSTI)

A stable reference electrode for use in monitoring and controlling the process of electrolytic reduction of a metal. In the case of Hall cell reduction of aluminum, the reference electrode comprises a pool of molten aluminum and a solution of molten cryolite, Na.sub.3 AlF.sub.6, wherein the electrical connection to the molten aluminum does not contact the highly corrosive molten salt solution. This is accomplished by altering the density of either the aluminum (decreasing the density) or the electrolyte (increasing the density) so that the aluminum floats on top of the molten salt solution.

Sadoway, Donald R. (Belmont, MA)

1988-01-01T23:59:59.000Z

391

Aluminum reference electrode  

DOE Patents (OSTI)

A stable reference electrode is described for use in monitoring and controlling the process of electrolytic reduction of a metal. In the case of Hall cell reduction of aluminum, the reference electrode comprises a pool of molten aluminum and a solution of molten cryolite, Na[sub 3]AlF[sub 6], wherein the electrical connection to the molten aluminum does not contact the highly corrosive molten salt solution. This is accomplished by altering the density of either the aluminum (decreasing the density) or the electrolyte (increasing the density) so that the aluminum floats on top of the molten salt solution. 1 fig.

Sadoway, D.R.

1988-08-16T23:59:59.000Z

392

EPRI HVDC Reference Book  

Science Conference Proceedings (OSTI)

This report is actually Chapter 17 of the EPRI HVDC Reference Book and describes a variety of simulation tools for high-voltage direct current (HVDC) systems. Modeling and simulation of HVDC systems is essential in the planning, engineering, designing, and operating stages of an HVDC system.

2008-04-15T23:59:59.000Z

393

Radwaste Desk Reference  

Science Conference Proceedings (OSTI)

This volume of the Radwaste Desk Reference contains fundamental practical and regulatory information on the transportation of radioactive waste. Because its information is based entirely on industry practice, the work can serve as an extensive how-to manual for both the newcomer and the experienced radwaste professional.

2011-07-28T23:59:59.000Z

394

ERCC to Begin Test Rounds for Final RNA Reference Set  

Science Conference Proceedings (OSTI)

... Richmond, Va.) to produce suites of RNA test samples that will ... The eight registered testing sites represent companies that manufacture microarrays ...

2012-10-01T23:59:59.000Z

395

Reference guide to small cogeneration systems for utilities. Final report  

SciTech Connect

This report covers systems performance and cost data for selected smaller cogeneration systems, which are defined generally as those cogeneration systems in the range below 5 megawatts. The data presented in this guide are expected to be used in two main ways. First, the data can be used to extend the existing DEUS Computer Evaluation Model data base to the smaller cogeneration systems. Second, the data will serve as a general guide to smaller cogeneration systems for use by the utilities companies and others. The data pertain to the following cogeneration system: gas turbine with heat recovery boiler, back pressure and extraction/condensing steam turbine, combined cycle, internal combustion (reciprocating) engine, steam bottoming cycle using industrial process exhaust, and gas turbine topping cycle with standard industrial process steam generators. A no-cogeneration base case is included for comparison purposes.

Rodden, R.M.; Boyen, J.L.; Waters, M.H.

1986-02-01T23:59:59.000Z

396

Solar energy legal bibliography. Final report. [160 references  

DOE Green Energy (OSTI)

The Solar Energy Legal Bibliography is a compilation of approximately 160 solar publications abstracted for their legal and policy content (through October 1978). Emphasis is on legal barriers and incentives to solar energy development. Abstracts are arranged under the following categories: Antitrust, Biomass, Building Codes, Consumer Protection, Environmental Aspects, Federal Legislation and Programs, Financing/Insurance, International Law, Labor, Land Use (Covenants, Easements, Nuisance, Zoning), Local Legislation and Programs, Ocean Energy, Patents and Licenses, Photovoltaics, Solar Access Rights, Solar Heating and Cooling, Solar Thermal Power Systems, Standards, State Legislation and Programs, Tax Law, Tort Liability, Utilities, Warranties, Wind Resources, and General Solar Law.

Seeley, D.; Euser, B.; Joyce, C.; Morgan, G. H.; Laitos, J. G.; Adams, A.

1979-03-01T23:59:59.000Z

397

NEWTON's Botany References  

NLE Websites -- All DOE Office Websites (Extended Search)

Botany References Botany References Do you have a great botany video? Please click our Ideas page. Featured Videos: AOL News AOL News - Botany Videos AOL news provides hundreds of botany videos from around the world. View informational and instructional videos as well as interviews about the latest botany topics and discoveries. NeoK12 Plant Videos NeoK12 - Every Plant Topic Imaginable Explore videos encompassing every category dealing with plants. Learn about photosynthesis, plant evolution, reproduction, and many more plant related videos. Fungus Image Fungi Videos BBC Nature provides informational videos about fugni and other organisms. Learn and explore a wide variety of topics concerning the fungus kingdom. Other Botany Videos: Botany Videos for Kids Look at various botany videos geared towards a younger audience.

398

MATLAB r ? / R Reference  

E-Print Network (OSTI)

I wrote the first version of this reference during the Spring 2007 semester, as I learned R while teaching my course “MAT400, Modeling & Simulation ” at the University of Maine. The course covers population and epidemiological modeling, including deterministic and stochastic models in discrete and continuous time, along with spatial models. Half of the class meetings are in a regular classroom, and half are in a computer lab where students work through modeling & simulation exercises. When I taught earlier versions of the course, it was based on Matlab only. In Spring 2007, some biology graduate students in the class who had learned R in statistics courses asked if they could use R in my class as well, and I said yes. My colleague Bill Halteman was a great help as I frantically learned R to stay ahead of the class. As I went, every time I learned how to do something in R for the course, I added it to this reference, so that I wouldn’t forget it later. Some items took a huge amount of time searching for a simple way to do what I wanted, but at the end of the semester, I was pleasantly surprised that almost everything I do in Matlab had an equivalent in R. I was also inspired to do this after seeing the “R for Octave Users” reference written by Robin Hankin. This reference is organized into general categories. There is also a Matlab index and an R index at the end, which should make it easy to look up a command you know in one of the languages and learn

David Hiebeler

2008-01-01T23:59:59.000Z

399

NIST Standard Reference Simulation Website  

Science Conference Proceedings (OSTI)

... simulations, that can be treated similar to "standard reference data ... techniques and compiled by NIST under the Standards Reference Data Program. ...

2013-08-27T23:59:59.000Z

400

Cleanup Verification Package for the 118-B-1, 105-B Solid Waste Burial Ground  

SciTech Connect

This cleanup verification package documents completion of remedial action, sampling activities, and compliance criteria for the 118-B-1, 105-B Solid Waste Burial Ground. This waste site was the primary burial ground for general wastes from the operation of the 105-B Reactor and P-10 Tritium Separation Project and also received waste from the 105-N Reactor. The burial ground received reactor hardware, process piping and tubing, fuel spacers, glassware, electrical components, tritium process wastes, soft wastes and other miscellaneous debris.

J. M. Capron

2008-01-21T23:59:59.000Z

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Sur le parcours des rayons 03B1 de l'uranium Par Lon BLOCH,  

E-Print Network (OSTI)

Sur le parcours des rayons 03B1 de l'uranium Par Léon BLOCH, Agrégé de l'Université de Paris parcours des rayons x de l'uranium a été dé- terminé par Bragg1 au moyen d'une méthode indirecte. Bragg a mesuré l'ionisatiol totale due au rayonnement de l'uranium lorsque la substance est recouverte d

Paris-Sud XI, Université de

402

Coal data: A reference  

SciTech Connect

This report, Coal Data: A Reference, summarizes basic information on the mining and use of coal, an important source of energy in the US. This report is written for a general audience. The goal is to cover basic material and strike a reasonable compromise between overly generalized statements and detailed analyses. The section ``Supplemental Figures and Tables`` contains statistics, graphs, maps, and other illustrations that show trends, patterns, geographic locations, and similar coal-related information. The section ``Coal Terminology and Related Information`` provides additional information about terms mentioned in the text and introduces some new terms. The last edition of Coal Data: A Reference was published in 1991. The present edition contains updated data as well as expanded reviews and additional information. Added to the text are discussions of coal quality, coal prices, unions, and strikes. The appendix has been expanded to provide statistics on a variety of additional topics, such as: trends in coal production and royalties from Federal and Indian coal leases, hours worked and earnings for coal mine employment, railroad coal shipments and revenues, waterborne coal traffic, coal export loading terminals, utility coal combustion byproducts, and trace elements in coal. The information in this report has been gleaned mainly from the sources in the bibliography. The reader interested in going beyond the scope of this report should consult these sources. The statistics are largely from reports published by the Energy Information Administration.

Not Available

1995-02-01T23:59:59.000Z

403

ILC cryogenic systems reference design  

SciTech Connect

A Global Design Effort (GDE) began in 2005 to study a TeV scale electron-positron linear accelerator based on superconducting radio-frequency (RF) technology, called the International Linear Collider (ILC). In early 2007, the design effort culminated in a reference design for the ILC, closely based on the earlier TESLA design. The ILC will consist of two 250 GeV linacs, which provide positron-electron collisions for high energy physics research. The particle beams will be accelerated to their final energy in superconducting niobium RF cavities operating at 2 kelvin. At a length of about 12 km each, the main linacs will be the largest cryogenic systems in the ILC. Positron and electron sources, damping rings, and beam delivery systems will also have a large number and variety of other superconducting RF cavities and magnets, which require cooling at liquid helium temperatures. Ten large cryogenic plants with 2 kelvin refrigeration are envisioned to cool the main linacs and the electron and positron sources. Three smaller cryogenic plants will cool the damping rings and beam delivery system components predominately at 4.5 K. This paper describes the cryogenic systems concepts for the ILC.

Peterson, T.J.; Geynisman, M.; Klebaner, A.; Theilacker, J.; /Fermilab; Parma, V.; Tavian, L.; /CERN

2008-01-01T23:59:59.000Z

404

Technical Reference OVERVIEW  

NLE Websites -- All DOE Office Websites (Extended Search)

Parking and the ENERGY STAR Score in the United States and Canada Page 1 Parking and the ENERGY STAR Score in the United States and Canada Page 1 Parking and the ENERGY STAR Score in the United States and Canada Technical Reference OVERVIEW The ENERGY STAR score provides a fair assessment of the energy performance of a property relative to its peers, taking into account the climate, weather, and business activities at the property. Parking areas are not eligible to earn the ENERGY STAR score. However, because parking is a common amenity at other commercial building types (i.e., office and hotels), the ENERGY STAR score does make adjustments to accommodate for the presence of parking.

405

Long life reference electrode  

DOE Patents (OSTI)

An external, reference electrode is provided for long term use with a high temperature, high pressure system. The electrode is arranged in a vertical, electrically insulative tube with an upper portion serving as an electrolyte reservoir and a lower portion in electrolytic communication with the system to be monitored. The lower end portion includes a flow restriction such as a porous plug to limit the electrolyte release into the system. A piston equalized to the system pressure is fitted into the upper portion of the tube to impart a small incremental pressure to the electrolyte. The piston is selected of suitable size and weight to cause only a slight flow of electrolyte through the porous plug into the high pressure system. This prevents contamination of the electrolyte but is of such small flow rate that operating intervals of a month or more can be achieved. 2 figs.

Yonco, R.M.; Nagy, Z.

1989-04-04T23:59:59.000Z

406

Nuclear Science References Database  

E-Print Network (OSTI)

The Nuclear Science References (NSR) database together with its associated Web interface, is the world's only comprehensive source of easily accessible low- and intermediate-energy nuclear physics bibliographic information for more than 210,000 articles since the beginning of nuclear science. The weekly-updated NSR database provides essential support for nuclear data evaluation, compilation and research activities. The principles of the database and Web application development and maintenance are described. Examples of nuclear structure, reaction and decay applications are specifically included. The complete NSR database is freely available at the websites of the National Nuclear Data Center http://www.nndc.bnl.gov/nsr and the International Atomic Energy Agency http://www-nds.iaea.org/nsr.

B. Pritychenko; E. B?ták; B. Singh; J. Totans

2013-02-27T23:59:59.000Z

407

Tank characterization reference guide  

Science Conference Proceedings (OSTI)

Characterization of the Hanford Site high-level waste storage tanks supports safety issue resolution; operations and maintenance requirements; and retrieval, pretreatment, vitrification, and disposal technology development. Technical, historical, and programmatic information about the waste tanks is often scattered among many sources, if it is documented at all. This Tank Characterization Reference Guide, therefore, serves as a common location for much of the generic tank information that is otherwise contained in many documents. The report is intended to be an introduction to the issues and history surrounding the generation, storage, and management of the liquid process wastes, and a presentation of the sampling, analysis, and modeling activities that support the current waste characterization. This report should provide a basis upon which those unfamiliar with the Hanford Site tank farms can start their research.

De Lorenzo, D.S.; DiCenso, A.T.; Hiller, D.B.; Johnson, K.W.; Rutherford, J.H.; Smith, D.J. [Los Alamos Technical Associates, Kennewick, WA (United States); Simpson, B.C. [Westinghouse Hanford Co., Richland, WA (United States)

1994-09-01T23:59:59.000Z

408

Data:164bd87f-5b41-466c-bbc0-82c037b1a1f3 | Open Energy Information  

Open Energy Info (EERE)

bd87f-5b41-466c-bbc0-82c037b1a1f3 bd87f-5b41-466c-bbc0-82c037b1a1f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lower Valley Energy Inc Effective date: 2011/10/01 End date if known: Rate name: R-1 Farm and Residential Service Sector: Residential Description: APPLICABLE: To farm and residential loads within the Cooperative's service area, subject to the established rules and regulations of the Cooperative and Regulatory Authorities. AVAILABLE: To Consumers that receive service through one meter for each household consisting of an individual family of one or more persons. Source or reference: http://psc.state.wy.us/htdocs/tariffs/wy_low1/0002a.pdf

409

Data:95c26772-4f58-48c0-aee5-14b1a146edb2 | Open Energy Information  

Open Energy Info (EERE)

2-4f58-48c0-aee5-14b1a146edb2 2-4f58-48c0-aee5-14b1a146edb2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Newton, North Carolina (Utility Company) Effective date: 2013/01/01 End date if known: 2014/07/01 Rate name: Electric Renewable Energy Credit Rider - RECR - 1 - Solar Photovoltaic Energy - 15 Year Fixed Sector: Description: Source or reference: http://www.newtonnc.gov/departments/finance/finance_documents.php Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

410

Data:748a608d-0f97-49b1-bbe6-174132ce8f20 | Open Energy Information  

Open Energy Info (EERE)

a608d-0f97-49b1-bbe6-174132ce8f20 a608d-0f97-49b1-bbe6-174132ce8f20 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Orangeburg, South Carolina (Utility Company) Effective date: 2007/05/16 End date if known: Rate name: 2SM30 - 50,000 Lumens (Mercury) Closed Type Globe Sector: Lighting Description: The following is the rate schedule for lights installed for street lighting for the City of Orangeburg. Source or reference: http://www.orbgdpu.com/PDF%20files/Electric%20-%20Code%202L,2P,2U%20-%20Overhead%20Private%20Lights.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW):

411

Data:086afd92-645b-444e-adfa-9c71eea4b1b2 | Open Energy Information  

Open Energy Info (EERE)

afd92-645b-444e-adfa-9c71eea4b1b2 afd92-645b-444e-adfa-9c71eea4b1b2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Valley Elec Coop, Inc Effective date: 2009/02/01 End date if known: Rate name: SL- 175 Watt MV 77 kWh (Steel Underground) Sector: Lighting Description: Source or reference: http://www.cvecoop.org/content/rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

412

Data:B8d64522-2abd-48f1-a38f-213b1db3f63b | Open Energy Information  

Open Energy Info (EERE)

22-2abd-48f1-a38f-213b1db3f63b 22-2abd-48f1-a38f-213b1db3f63b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Flint Electric Membership Corp Effective date: 2007/04/01 End date if known: Rate name: Outdoor Lighting NGOS Directional Flood MH 400 W Sector: Lighting Description: If on a leased pole, add a $3.10 monthly charge. POLE CHARGES Type, Charge 30' Wood $205.00 35' Wood $220.00 16' Aluminum (Brushed) $250.00 16' Fiberglass (Black) $300.00 16' Fiberglass (Acorn, Black) $800.00 30' Steel & Sub Base $1325.00 30' Fiberglass with 6' Arm $625.00 30' Fiberglass with 2 - 6' Arm $725.00 Source or reference: http://www.flintenergies.com/myHome/residentialRates/covenantStreetLighting.aspx

413

Data:8bff045b-1afd-4e8a-a16f-5b213a8708e4 | Open Energy Information  

Open Energy Info (EERE)

b-1afd-4e8a-a16f-5b213a8708e4 b-1afd-4e8a-a16f-5b213a8708e4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Blue Grass Energy Coop Corp Effective date: 2011/06/01 End date if known: Rate name: 100 Watt HPS- Colonial Fixture Sector: Lighting Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Rates%20Collected/Attachments/125/1%20COOP,%20KY,%20Blue%20Grass%20Energy%20Tariff-2.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

414

Data:4fdf41f8-b072-4afb-b8b1-8d4d1a722eff | Open Energy Information  

Open Energy Info (EERE)

1f8-b072-4afb-b8b1-8d4d1a722eff 1f8-b072-4afb-b8b1-8d4d1a722eff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Emerson, Nebraska (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: 250 watt High Pressure Sodium Sector: Lighting Description: All customers are eligible to lease private lighting owned and maintained by NeNPPD. This leased lighting is unmetered and NeNPPD provides all of the energy required. See other side for private lighting service agreement Source or reference: http://nnppd.com/billing/rates/ Source Parent: Comments Applicability Demand (kW)

415

Data:625f2078-2b1f-44cb-bf4f-cc64afa5be8b | Open Energy Information  

Open Energy Info (EERE)

-2b1f-44cb-bf4f-cc64afa5be8b -2b1f-44cb-bf4f-cc64afa5be8b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Franklin Rural Electric Cooperative Effective date: 2010/05/01 End date if known: Rate name: Single Phase Sector: Commercial Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/199/Franklin%20Rural%20Electric%20Coop,%20IA.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

416

Data:5eff9771-d2b6-427c-9b1b-ac4274ad69b9 | Open Energy Information  

Open Energy Info (EERE)

eff9771-d2b6-427c-9b1b-ac4274ad69b9 eff9771-d2b6-427c-9b1b-ac4274ad69b9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Douglas, Georgia (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Small Power Sector: Industrial Description: Current month kW + prior 11 months kW < 30 kW & 12 mo. average kWh of up to 5,000 kWh. Source or reference: Rate Binder Kelly 2 ISU Documentation Source Parent: Comments Minimum monthly bill: $25 + ($8.00*Billing kW in excess of 10 kW) + PCA & ECCR & Tax Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

417

Data:997d877a-bfae-4a75-b0b1-a273e4e4685f | Open Energy Information  

Open Energy Info (EERE)

d877a-bfae-4a75-b0b1-a273e4e4685f d877a-bfae-4a75-b0b1-a273e4e4685f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Choctaw Electric Coop Inc Effective date: 2008/10/21 End date if known: Rate name: Large Power 3 ,Three-Phase Level 1 Sector: Commercial Description: * Available to consumers with installed capacity of 5,000kW of demand per month and taken at primary voltage with a service under term contract. Service will be delivered to one location through one meter.This rate will not be available for service as standby or auxiliary. Subject to only Power Cost Adjustment. Source or reference: Rate binder # 4

418

Data:A38f9a19-2b1a-46bb-815e-96dbd2dcf372 | Open Energy Information  

Open Energy Info (EERE)

f9a19-2b1a-46bb-815e-96dbd2dcf372 f9a19-2b1a-46bb-815e-96dbd2dcf372 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: McCook Public Power District Effective date: 2012/01/01 End date if known: Rate name: Idel Fee 3 Phase 33-75 HP Sector: Commercial Description: Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

419

Data:7fdcff04-58e1-46b1-a1e0-3ea89fd5a135 | Open Energy Information  

Open Energy Info (EERE)

fdcff04-58e1-46b1-a1e0-3ea89fd5a135 fdcff04-58e1-46b1-a1e0-3ea89fd5a135 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Jackson, Tennessee (Utility Company) Effective date: 2012/08/01 End date if known: Rate name: Manufacturing Service SMSB Sector: Commercial Description: Source or reference: http://www.jaxenergy.com/rates/downloads/ELECTRIC_R.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

420

Data:Bb8252b1-9a63-400c-9d72-0a61fde39b2d | Open Energy Information  

Open Energy Info (EERE)

252b1-9a63-400c-9d72-0a61fde39b2d 252b1-9a63-400c-9d72-0a61fde39b2d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Modesto Irrigation District Effective date: 2013/04/01 End date if known: Rate name: Schedule SL - Lamp and Fixture on Pole - 100 Watt SV Sector: Lighting Description: This section of this Schedule is applicable to all night lighting on the public streets, alleys, highways and parks for cities, lighting districts or other public bodies. Public outdoor area lighting for other than all night lighting is supplied under Rate Schedule GS. Source or reference: www.mid.org/tariffs/rates/SL_STREET_LIGHTING.pdf

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Data:7a100dd6-0f7c-4f02-ad3d-f3b1ab128602 | Open Energy Information  

Open Energy Info (EERE)

0dd6-0f7c-4f02-ad3d-f3b1ab128602 0dd6-0f7c-4f02-ad3d-f3b1ab128602 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lower Yellowstone R E A, Inc Effective date: 2010/09/14 End date if known: Rate name: Schedule YL - 400 Watt Mercury Vapor light Sector: Lighting Description: Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

422

Data:F3c8beb6-ec5a-4b1c-af42-d7d510258b85 | Open Energy Information  

Open Energy Info (EERE)

c8beb6-ec5a-4b1c-af42-d7d510258b85 c8beb6-ec5a-4b1c-af42-d7d510258b85 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Elec Member Corp (Tennessee) Effective date: 2013/06/01 End date if known: Rate name: 85 Watt Induction Sector: Lighting Description: Source or reference: http://www.tcemc.org/index.php/residential-information/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3

423

Data:72534c38-3373-4b1d-aeae-3e864fa15cbb | Open Energy Information  

Open Energy Info (EERE)

72534c38-3373-4b1d-aeae-3e864fa15cbb 72534c38-3373-4b1d-aeae-3e864fa15cbb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2013/11/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 3 - 25kW or more ESS (Retail) Primary Voltage Sector: Industrial Description: APPLICABLE TO THE USE OF SERVICE FOR: Primary Service for any customer with a demand of 25 kilowatts or more but less than 500 kilowatts. Flat rate Adjustments = Transition Charge. Reactive Charge: $0.00078/kWh. Source or reference: http://www.nyseg.com/MediaLibrary/2/5/Content%20Management/NYSEG/SuppliersPartners/PDFs%20and%20Docs/PSC120ServiceClassification_3.pdf

424

Data:Fc0d4483-fb01-4ec3-a1c5-cb9b1cde42e4 | Open Energy Information  

Open Energy Info (EERE)

83-fb01-4ec3-a1c5-cb9b1cde42e4 83-fb01-4ec3-a1c5-cb9b1cde42e4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pontotoc Electric Power Assn Effective date: 2013/07/01 End date if known: Rate name: Security Light HPS 100 W Sector: Lighting Description: Source or reference: http://www.sitemason.com/files/fjDo1q/May%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

425

Data:Bced1382-cd66-40b1-b5c9-938fb4d99fc9 | Open Energy Information  

Open Energy Info (EERE)

Bced1382-cd66-40b1-b5c9-938fb4d99fc9 Bced1382-cd66-40b1-b5c9-938fb4d99fc9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeast Colorado Power Assn Effective date: 2012/01/01 End date if known: Rate name: Yard Lighting: Fluomeric, Quartz or High Pressure Sodium: 100 Watt Lamp Sector: Lighting Description: One 100 Watt Lamp ( 36 kwh/mo.) Source or reference: http://secpa.com/sites/rate-schedules.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

426

Data:Ab37f2f5-98da-44fe-9022-1bd07c0b1c9a | Open Energy Information  

Open Energy Info (EERE)

Ab37f2f5-98da-44fe-9022-1bd07c0b1c9a Ab37f2f5-98da-44fe-9022-1bd07c0b1c9a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeastern Indiana R E M C Effective date: 2010/05/01 End date if known: Rate name: SECURITY LIGHTING SERVICES: 400W Metal Halide or Mercury Vapor Sector: Lighting Description: Dusk till Dawn Lighting Service Source or reference: http://www.seiremc.com/2006/rate_sch/2010/SLSecurityLightingService-5-1-10.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

427

Data:1302e0a5-8e1a-495e-a1b1-738457116d9a | Open Energy Information  

Open Energy Info (EERE)

a5-8e1a-495e-a1b1-738457116d9a a5-8e1a-495e-a1b1-738457116d9a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kit Carson Electric Coop, Inc Effective date: 2011/09/22 End date if known: Rate name: Lighting Service - Unmetered Wooden Pole - 250 H.P.S. Sector: Lighting Description: Available to all consumers and within the Utility's service area, unless otherwise noted. Source or reference: www.kitcarson.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

428

Data:D3498234-4247-43b1-9ca7-262cf4f22fd9 | Open Energy Information  

Open Energy Info (EERE)

234-4247-43b1-9ca7-262cf4f22fd9 234-4247-43b1-9ca7-262cf4f22fd9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Middle Georgia El Member Corp Effective date: End date if known: Rate name: General Service Sector: Commercial Description: Source or reference: http://www.mgemc.com/rates.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

429

Data:9d362535-6f01-4f01-9e2a-86fdd27b45b1 | Open Energy Information  

Open Energy Info (EERE)

9d362535-6f01-4f01-9e2a-86fdd27b45b1 9d362535-6f01-4f01-9e2a-86fdd27b45b1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Denton, Texas (Utility Company) Effective date: 2013/10/01 End date if known: Rate name: Residential- Renewable Energy- Three Phase Sector: Residential Description: Source or reference: http://www.cityofdenton.com/Home/ShowDocument?id=17274 Source Parent: http://www.cityofdenton.com Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

430

Data:Dfa2a5b3-f9eb-4eab-944a-9c7590b1b56a | Open Energy Information  

Open Energy Info (EERE)

Dfa2a5b3-f9eb-4eab-944a-9c7590b1b56a Dfa2a5b3-f9eb-4eab-944a-9c7590b1b56a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clarksdale Public Utilities Effective date: 2011/10/01 End date if known: Rate name: Lighting- I1 Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

431

Data:6b760ffb-e728-49a1-b79b-1d44f8c611e7 | Open Energy Information  

Open Energy Info (EERE)

ffb-e728-49a1-b79b-1d44f8c611e7 ffb-e728-49a1-b79b-1d44f8c611e7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Smyrna Beach, Florida (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: MV-Cobra 175 watts Sector: Lighting Description: Fixed Monthly Charge= Energy Rate + Maintenance Source or reference: http://ucnsb.org/pdf/Rates%20Charges%20and%20Fees.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

432

Data:Ca294646-53b1-4a10-96e5-7e525508bfe3 | Open Energy Information  

Open Energy Info (EERE)

46-53b1-4a10-96e5-7e525508bfe3 46-53b1-4a10-96e5-7e525508bfe3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Huntersville, North Carolina (Utility Company) Effective date: 2010/07/01 End date if known: Rate name: Small Commercial- 3-Phase Sector: Commercial Description: Demand Charges: First 30 kW: No Charge All over 30 kW: $4.63/kW Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/210/Huntersville%20NC.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

433

Data:Ec554b62-3b1a-4913-a7a0-16e580478ac6 | Open Energy Information  

Open Energy Info (EERE)

54b62-3b1a-4913-a7a0-16e580478ac6 54b62-3b1a-4913-a7a0-16e580478ac6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Omaha Public Power District Effective date: 2013/01/01 End date if known: Rate name: CONSUMER OWNED STREET LIGHTING Metal Halide 250 Sector: Lighting Description: CONSUMER OWNED SYSTEM OPERATED BY DISTRICT Source or reference: http://ww3.oppd.com/rates/OppdRateManual.pdf#nameddest=110 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

434

Data:1722db6d-be94-4a17-8e4c-5b1fa89b5548 | Open Energy Information  

Open Energy Info (EERE)

d-be94-4a17-8e4c-5b1fa89b5548 d-be94-4a17-8e4c-5b1fa89b5548 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Jasper, Indiana (Utility Company) Effective date: 2009/09/01 End date if known: Rate name: Municipal Street Light (250 W HPS) Sector: Lighting Description: Applicable only for street, alley and park lighting and traffic signals of the City of Jasper. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

435

Data:Bfdbdf3d-e2ff-425e-936b-1e1bfa1132f6 | Open Energy Information  

Open Energy Info (EERE)

Bfdbdf3d-e2ff-425e-936b-1e1bfa1132f6 Bfdbdf3d-e2ff-425e-936b-1e1bfa1132f6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lakeland, Florida (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: Private Area Lighting HPS 100 Watt - Granville (Decorative) - Service Option B Sector: Lighting Description: Service Options A. Fixture and Installation Only; B. Maintenance of Fixture Only; C. Energy, Excluding Fuel Charge, for Fixture Only; and D. Full Service: The sum of each of the above Discrete Private Area Lighting Charges (A+B+C), plus the monthly service charge Source or reference: http://www.lakelandelectric.com/Portals/0/docs/pdf/Rates%20&%20Pricing/Electric%20Rates%20Tariffs/html/files/assets/common/downloads/publication.pdf

436

Data:9a350bb9-c067-48a8-9c33-c2d209b1f650 | Open Energy Information  

Open Energy Info (EERE)

50bb9-c067-48a8-9c33-c2d209b1f650 50bb9-c067-48a8-9c33-c2d209b1f650 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tell City, Indiana (Utility Company) Effective date: 2008/07/01 End date if known: Rate name: Tariff E1, 2000 or Greater KVA Three Phase Large Power Sector: Industrial Description: The charges derived in the Tariff E rate are subject to adjustment for: Purchased Power Adjustment Tracking Factor. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

437

Data:D79b0f76-23e1-43b1-9387-0449224e6cb6 | Open Energy Information  

Open Energy Info (EERE)

f76-23e1-43b1-9387-0449224e6cb6 f76-23e1-43b1-9387-0449224e6cb6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Harmony, Minnesota (Utility Company) Effective date: 2012/06/15 End date if known: Rate name: Municipal Outdoor Lighting Sector: Lighting Description: Additional Info: Summer June 15th - September 15th of usage Other January 15th - June 15th & September 15th - January 15th of usage Source or reference: http://www.harmony.mn.us/vertical/sites/%7BF58070D9-8755-4E19-AB36-50206B76B06C%7D/uploads/2012_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW):

438

Data:646b1bed-b381-4ca8-b0a0-0f1f75feb89f | Open Energy Information  

Open Energy Info (EERE)

b1bed-b381-4ca8-b0a0-0f1f75feb89f b1bed-b381-4ca8-b0a0-0f1f75feb89f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric System Effective date: End date if known: Rate name: Large Light and Power Off-Peak Seasonal Dual Daily Primary Sector: Description: Excess kVA Source or reference: http://www.les.com/your_business/rate_schedules_llp.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

439

Data:5248faf0-5a2e-44d0-a90c-84bcbccc1b1c | Open Energy Information  

Open Energy Info (EERE)

faf0-5a2e-44d0-a90c-84bcbccc1b1c faf0-5a2e-44d0-a90c-84bcbccc1b1c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Kittitas County Effective date: 2013/02/01 End date if known: Rate name: Irrigation Service, Less than 100 HP Off Season Rate (1013) Sector: Industrial Description: Horsepower Charge $24.00/hp (larger than 10hp only)/season Source or reference: http://www.kittitaspud.com/pdf/Irrigation_Small_1003-1013.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

440

Data:1ee386d1-a3f2-45f8-a4fc-5c5951995b1f | Open Energy Information  

Open Energy Info (EERE)

86d1-a3f2-45f8-a4fc-5c5951995b1f 86d1-a3f2-45f8-a4fc-5c5951995b1f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Painesville, Ohio (Utility Company) Effective date: 1990/07/01 End date if known: Rate name: Disconnecting/Reconnecting Service; Requested by Consumer-Within Corporate Limits Sector: Commercial Description: When a consumer requests temporary disconnecting followed by reconnecting service, for the purpose of adding aluminum siding to a structure, or for other similar purposes, a disconnection/reconnection charge shall be required Source or reference: http://www.amlegal.com/nxt/gateway.dll/Ohio/painesville_oh/codifiedordinancesofthecityofpainesville?f=templates$fn=default.htm$3.0$vid=amlegal:painesville_oh

Note: This page contains sample records for the topic "references b-1 final" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Data:B12562b1-7c2b-4d95-ba4b-74f842e02cd5 | Open Energy Information  

Open Energy Info (EERE)

b1-7c2b-4d95-ba4b-74f842e02cd5 b1-7c2b-4d95-ba4b-74f842e02cd5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Loup River Public Power Dist Effective date: 2013/01/15 End date if known: Rate name: Area Lighting Customer Purchase 175W MV Sector: Commercial Description: Source or reference: http://www.loup.com/customersvc/rates.asp Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

442

Data:9cef12b1-4d9f-4cbf-b92f-c95515f5292a | Open Energy Information  

Open Energy Info (EERE)

2b1-4d9f-4cbf-b92f-c95515f5292a 2b1-4d9f-4cbf-b92f-c95515f5292a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coos-Curry Electric Coop, Inc Effective date: 2011/12/22 End date if known: Rate name: Security Lighting, 175 Watt MV Sector: Lighting Description: * For yard or security lighting. Source or reference: Rate binder #4 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

443

Data:34e1c885-fc9e-4b71-b1d3-957d0a886f1e | Open Energy Information  

Open Energy Info (EERE)

c885-fc9e-4b71-b1d3-957d0a886f1e c885-fc9e-4b71-b1d3-957d0a886f1e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2011/09/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 5 Outdoor Lighting Service - ESS Safeguard HPS 940W Sector: Lighting Description: APPLICABLE TO THE USE OF SERVICE FOR: Outdoor lighting for residential and general service customers where applicable electric service is available. Flat rate Adjustments = Transition Charge. Source or reference: http://www.nyseg.com/MediaLibrary/2/5/Content%20Management/NYSEG/SuppliersPartners/PDFs%20and%20Docs/PSC120ServiceClassification_5.pdf

444

Data:Cc0e8e42-8040-4aa3-b1aa-2fd0e3b6109f | Open Energy Information  

Open Energy Info (EERE)

e8e42-8040-4aa3-b1aa-2fd0e3b6109f e8e42-8040-4aa3-b1aa-2fd0e3b6109f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eugene, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Schedule L-4 (Private Property Lighting Service) - 70 Watt High Efficiency High Pressure Sodium Sector: Description: To overhead outdoor lighting from dusk-to-dawn each day throughout the year for lighting private property with facilities supplied by EWEB. For the purposes of administering this service, the primary references are Eugene Code 9.6725 and all EWEB policies and procedures pertaining to light pollution, light trespass and glare.

445

Data:84f88dff-90f3-42b1-a05c-30d8d4d375f0 | Open Energy Information  

Open Energy Info (EERE)

dff-90f3-42b1-a05c-30d8d4d375f0 dff-90f3-42b1-a05c-30d8d4d375f0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mid-Kansas Electric Company, LLC (MKEC) Effective date: 2010/01/14 End date if known: Rate name: Flood Lights-400W(On New Pole-100% Customer Investment Option) Sector: Lighting Description: Unmetered Facilities. The average consumption per month is 160kWh Source or reference: Rate Binder #6, Illinois State University. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

446

Data:24885d23-d2aa-46b1-a9ee-b6467f456c97 | Open Energy Information  

Open Energy Info (EERE)

-d2aa-46b1-a9ee-b6467f456c97 -d2aa-46b1-a9ee-b6467f456c97 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pacific Gas & Electric Co Effective date: 2012/07/01 End date if known: Rate name: AG-4B 2012 Sector: Commercial Description: Source or reference: http://www.pge.com/nots/rates/tariffs/tm2/pdf/ELEC_SCHEDS_AG-4.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

447

Data:Db820e3e-ed37-4ced-b1ff-e7bca1230a59 | Open Energy Information  

Open Energy Info (EERE)

e3e-ed37-4ced-b1ff-e7bca1230a59 e3e-ed37-4ced-b1ff-e7bca1230a59 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Three Lights 175Watt MVL Sector: Lighting Description: - Available to all consumers located on or adjacent to cooperative's single-phase or three-phase lines. - Subject to power cost adjustment,tax adjustment and rate revisions. - Monthly rate depend on light within 150ft. proximity. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

448

Data:60f889a9-40cc-4a80-b1ca-29bab8929e70 | Open Energy Information  

Open Energy Info (EERE)

a9-40cc-4a80-b1ca-29bab8929e70 a9-40cc-4a80-b1ca-29bab8929e70 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Flint Electric Membership Corp Effective date: 2007/04/01 End date if known: Rate name: Outdoor Lighting NGOS Directional Flood MH 1000 W Sector: Lighting Description: If on a leased pole, add a $3.10 monthly charge. POLE CHARGES Type, Charge 30' Wood $205.00 35' Wood $220.00 16' Aluminum (Brushed) $250.00 16' Fiberglass (Black) $300.00 16' Fiberglass (Acorn, Black) $800.00 30' Steel & Sub Base $1325.00 30' Fiberglass with 6' Arm $625.00 30' Fiberglass with 2 - 6' Arm $725.00 Source or reference: http://www.flintenergies.com/myHome/residentialRates/covenantStreetLighting.aspx

449

Data:0af897f0-ac5c-41df-ae6e-f1710b1d92b7 | Open Energy Information  

Open Energy Info (EERE)

af897f0-ac5c-41df-ae6e-f1710b1d92b7 af897f0-ac5c-41df-ae6e-f1710b1d92b7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern States Power Co - Minnesota (South Dakota) Effective date: 2012/08/01 End date if known: Rate name: SGS-TOD (Small General Service Time-Of-Day) Sector: Description: AVAILABILITY Available to any non-residential customer for single or three phase electric service supplied through one meter. Source or reference: https://www.xcelenergy.com/staticfiles/xe/Regulatory/Se_Section_5.pdf Source Parent: Comments Applicable to 0kW-25kW Applicability Demand (kW) Minimum (kW): Maximum (kW):

450

Data:84259fb1-ed0b-4ab1-95b1-a4f9da2d0e5f | Open Energy Information  

Open Energy Info (EERE)

ed0b-4ab1-95b1-a4f9da2d0e5f ed0b-4ab1-95b1-a4f9da2d0e5f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Midwest Energy Inc Effective date: 2012/06/29 End date if known: Rate name: FSLS- HPS 150 Watt 59 kWh Sector: Lighting Description: Source or reference: http://www.mwenergy.com/elecrate.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

451

Data:Bce36ebc-2520-410b-ae7c-c970a6b1d1cc | Open Energy Information  

Open Energy Info (EERE)

Bce36ebc-2520-410b-ae7c-c970a6b1d1cc Bce36ebc-2520-410b-ae7c-c970a6b1d1cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Louisiana Inc Effective date: 2006/01/31 End date if known: Rate name: Business Schedule GS - 1W (Rider UMS-5) (primary voltage) Sector: Commercial Description: This rider is applicable to electric service required by Customers who contract for unmetered electric service under Schedule GS to billboards, unmetered telephone services, telephone booths, railroad signals, cathodic units, traffic cameras or for community antenna systems' pole mounted power supplies, amplifiers, and related incidental equipment, hereinafter referred to as equipment, or other such equipment where metering is not feasible or economical.

452

Data:46febe7c-5e34-46fd-8a73-14faf3d58b1a | Open Energy Information  

Open Energy Info (EERE)

febe7c-5e34-46fd-8a73-14faf3d58b1a febe7c-5e34-46fd-8a73-14faf3d58b1a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Grand River Dam Authority Effective date: 2011/07/01 End date if known: Rate name: wholesale power service with Customer Generation Bus Sector: Commercial Description: Source or reference: http://www.grda.com/electric/customer-service/wholesale-sales/power-service-with-customer-generation/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

453

Data:9f624d7f-fb63-4b1f-95cd-d0e661f310cd | Open Energy Information  

Open Energy Info (EERE)

f-fb63-4b1f-95cd-d0e661f310cd f-fb63-4b1f-95cd-d0e661f310cd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Custer Public Power District Effective date: 2013/01/01 End date if known: Rate name: IRRIGATION - RATE CLASS 32 Sector: Commercial Description: Two Day Control. Notice: Deadline for Irrigation Rate changes is April 1st. Source or reference: http://www.custerpower.com/2012_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

454

Data:86a829b1-0c31-4da9-a9fe-304a987ca442 | Open Energy Information  

Open Energy Info (EERE)

b1-0c31-4da9-a9fe-304a987ca442 b1-0c31-4da9-a9fe-304a987ca442 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Pend Oreille Cnty Effective date: End date if known: Rate name: COMMERCIAL SERVICE 2 Three Phase Sector: Industrial Description: Source or reference: http://173.236.244.134/wp-content/uploads/2010/12/Electric-Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

455

Data:Da03f2b2-84dc-4311-9f13-ce5b1ed3b348 | Open Energy Information  

Open Energy Info (EERE)

3f2b2-84dc-4311-9f13-ce5b1ed3b348 3f2b2-84dc-4311-9f13-ce5b1ed3b348 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Smyrna Beach, Florida (Utility Company) Effective date: 2006/06/01 End date if known: Rate name: GS-NDERS (3 phase) Sector: Commercial Description: This schedule is available at any location within the Utilities Commission service area in accordance with Commission service policies to non-residential customers with an annual measured peak demand of less than 50 kW. Source or reference: http://ucnsb.org/pdf/Rates%20Charges%20and%20Fees.pdf Source Parent: Comments Three Phase Rate

456

Data:F7f0322e-3b1f-416c-a1ba-748d1304b2fd | Open Energy Information  

Open Energy Info (EERE)

22e-3b1f-416c-a1ba-748d1304b2fd 22e-3b1f-416c-a1ba-748d1304b2fd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers Electric Coop Corp Effective date: 2006/08/08 End date if known: Rate name: Rate MSL- Municiple Street Lighting (400 W additional unit on same pole) Sector: Lighting Description: To lighting service required by the municipality for streets, alleys and other public ways. Not applicable to temporally, resale, shared or seasonal service. Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Rates%20Collected/Attachments/283/Farmers%20Electric%20Coop%20Corp%20AR%20Rates.PDF

457

Data:F77ed989-582c-4fe5-8fe9-fb07a47b1ee4 | Open Energy Information  

Open Energy Info (EERE)

89-582c-4fe5-8fe9-fb07a47b1ee4 89-582c-4fe5-8fe9-fb07a47b1ee4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bountiful, Utah (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Residential-Beacon light fee, per lamp, per month Sector: Lighting Description: This schedule is for services and products rendered to Customers by BCLP. Source or reference: http://www.bountifulutah.gov/WorkArea/showcontent.aspx?id=6138 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

458

Data:79f6d644-ce62-4fa9-8c61-fc88bdd4b3b1 | Open Energy Information  

Open Energy Info (EERE)

4-ce62-4fa9-8c61-fc88bdd4b3b1 4-ce62-4fa9-8c61-fc88bdd4b3b1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bowling Green, Kentucky (Utility Company) Effective date: 2012/05/01 End date if known: Rate name: Commercial Sector: Commercial Description: Available for 50kW or less during the past 12 months. Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/202/Bowling%20Green_0061.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

459

Data:Dbe25a1e-0788-49b1-8754-82fee5bf271f | Open Energy Information  

Open Energy Info (EERE)

Dbe25a1e-0788-49b1-8754-82fee5bf271f Dbe25a1e-0788-49b1-8754-82fee5bf271f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nodak Electric Coop Inc Effective date: 2012/05/20 End date if known: Rate name: GS Urban-Three Phase Sector: Residential Description: Additional Meters (Off-Peak Included) $ 3.60/Meter/Month Renewable Energy Market Adjustment $0.003/KWH (Added to All Above Energy Rates) Controlled Water Heater Credit $.00736/KWH Applies to the first 1,000 KWHs each month (October-March) Source or reference: http://www.nodakelectric.com/wp-content/uploads/2011/04/General-Service-Rate-Urban1.pdf

460

Data:2fdc96a0-6e80-47de-95c2-82e68b1b9120 | Open Energy Information  

Open Energy Info (EERE)

fdc96a0-6e80-47de-95c2-82e68b1b9120 fdc96a0-6e80-47de-95c2-82e68b1b9120 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Milan, Ohio (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Residential Service Sector: Residential Description: Rate is available for residential service to installations served through one meter for each family unit in a residence or apartment. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage