Powered by Deep Web Technologies
Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Green Scheduling: Scheduling of Control Systems for Peak Power Reduction  

E-Print Network (OSTI)

approach to fine-grained coordination of energy demand by scheduling energy consuming control systems of the system variables only, control system execution (i.e. when energy is supplied to the system-Scheduling; Energy Systems; Peak Power Reduction; Load Balancing; I. INTRODUCTION During a major sporting event

Pappas, George J.

2

Cost and schedule reduction for next-generation Candu  

SciTech Connect

AECL has developed a suite of technologies for Candu{sup R} reactors that enable the next step in the evolution of the Candu family of heavy-water-moderated fuel-channel reactors. These technologies have been combined in the design for the Advanced Candu Reactor TM1 (ACRTM), AECL's next generation Candu power plant. The ACR design builds extensively on the existing Candu experience base, but includes innovations, in design and in delivery technology, that provide very substantial reductions in capital cost and in project schedules. In this paper, main features of next generation design and delivery are summarized, to provide the background basis for the cost and schedule reductions that have been achieved. In particular the paper outlines the impact of the innovative design steps for ACR: - Selection of slightly enriched fuel bundle design; - Use of light water coolant in place of traditional Candu heavy water coolant; - Compact core design with unique reactor physics benefits; - Optimized coolant and turbine system conditions. In addition to the direct cost benefits arising from efficiency improvement, and from the reduction in heavy water, the next generation Candu configuration results in numerous additional indirect cost benefits, including: - Reduction in number and complexity of reactivity mechanisms; - Reduction in number of heavy water auxiliary systems; - Simplification in heat transport and its support systems; - Simplified human-machine interface. The paper also describes the ACR approach to design for constructability. The application of module assembly and open-top construction techniques, based on Candu and other worldwide experience, has been proven to generate savings in both schedule durations and overall project cost, by reducing premium on-site activities, and by improving efficiency of system and subsystem assembly. AECL's up-to-date experience in the use of 3-D CADDS and related engineering tools has also been proven to reduce both engineering and construction costs through more efficient work planning and use of materials, through reduced re-work and through more precise configuration management. Full-scale exploitation of AECL's electronic engineering and project management tools enables further reductions in cost. The Candu fuel-channel reactor type offers inherent manufacturing and construction advantages through the application of a simple, low-pressure low-temperature reactor vessel along with modular fuel channel technology. This leads to cost benefits and total project schedule benefits. As a result, the targets which AECL has set for replication units - overnight capital cost of $1000 US/kW and total project schedule (engineering/manufacturing/construction/commissioning) of 48 months, have been shown to be achievable for the reference NG Candu design. (authors)

Hopwood, J.M.; Yu, S.; Pakan, M.; Soulard, M. [Atomic Energy of Canada Limited, 2251 Speakman Drive, Mississauga, Ontario, L5K 1B2 (Canada)

2002-07-01T23:59:59.000Z

3

Impact of User Mobility and Asymmetry on Multiuser Scheduler Performance  

E-Print Network (OSTI)

Impact of User Mobility and Asymmetry on Multiuser Scheduler Performance Pengcheng Zhan, Ramesh throughput for fairness across UTs by scheduling the UTs based on the instantaneous channel Pengcheng Zhan

Swindlehurst, A. Lee

4

Emissions Reduction Impact of Renewables  

E-Print Network (OSTI)

p. 1 Energy Systems Laboratory ? 2012 EMISSIONS REDUCTION IMPACT OF RENEWABLES October 2012 Jeff Haberl, Bahman Yazdani, Charles Culp Energy Systems Laboratory Texas A&M University p. 2 Energy Systems Laboratory ? 2012... Do TCEQ: Vince Meiller, Bob Gifford ERCOT: Warren Lasher USEPA: Art Diem, Julie Rosenberg ACKNOWLEDGEMENTS p. 3 Energy Systems Laboratory ? 2012 RENEWABLES Solar PV Solar Thermal Hydro Biomass Landfill Gas Geothermal p. 4...

Haberl, J. S.; Yazdani, B.; Culp, C.

2012-01-01T23:59:59.000Z

5

Pollution Prevention - Environmental Impact Reduction Checklists for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pollution Prevention - Environmental Impact Reduction Checklists Pollution Prevention - Environmental Impact Reduction Checklists for NEPA/309 Reviewers Pollution Prevention - Environmental Impact Reduction Checklists for NEPA/309 Reviewers The environmental review process under the National Environmental Policy Act (NEPA) provides a valuable opportunity for Federal agency NEPA/309 reviewers to incorporate pollution prevention and environmental impact reduction into actions (or projects). This Environmental Protection Agency guidance was prepared to assist NEPA/309 reviewers in incorporating pollution prevention into each step of the environmental review process, including scoping, mitigation, monitoring, and enforcement. POLLUTION PREVENTION - ENVIRONMENTAL IMPACT REDUCTION CHECKLISTS FOR NEPA/309 REVIEWERS JANUARY 1995

6

Pollution Prevention - Environmental Impact Reduction Checklists for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pollution Prevention - Environmental Impact Reduction Checklists Pollution Prevention - Environmental Impact Reduction Checklists for NEPA/309 Reviewers Pollution Prevention - Environmental Impact Reduction Checklists for NEPA/309 Reviewers The environmental review process under the National Environmental Policy Act (NEPA) provides a valuable opportunity for Federal agency NEPA/309 reviewers to incorporate pollution prevention and environmental impact reduction into actions (or projects). This Environmental Protection Agency guidance was prepared to assist NEPA/309 reviewers in incorporating pollution prevention into each step of the environmental review process, including scoping, mitigation, monitoring, and enforcement. POLLUTION PREVENTION - ENVIRONMENTAL IMPACT REDUCTION CHECKLISTS FOR NEPA/309 REVIEWERS JANUARY 1995

7

Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Schedules Schedules Schedules Print Current Long-Term Operating Schedule August-December 2013 Upcoming Long-Term Operating Schedule January-July 2014 New! ALS Operating Schedule on Google Calendar Past Long-Term Operating Schedules January-July 2013 July-December 2012 January-June 2012 July-December 2011 January-June 2011 July-December 2010 January-June 2010 July-December 2009 January-June 2009 July-December 2008 January-June 2008 July-December 2007 February-June 2007 July 2006-February 2007 January-June 2006 July-December 2005 January-June 2005 June-December 2004 December 2003-May 2004 June 2003-November 2003 December 2002-May 2003 June 2002-November 2002 December 2001-May 2002 May 2001-December 2001 January 2001-April 2001 July 2000-December 2000 January 2000-June 2000 April 1999-December 1999

8

Impact of GHG Emission Reduction on Power Generation Expansion Planning  

Science Journals Connector (OSTI)

In this work the impact of greenhouse gas (GHG) emission reduction on Power Generation Expansion Planning ... models, which also consider environmental constraints and GHG emission limits, is presented. After a s...

F. Careri; C. Genesi; P. Marannino; M. Montagna

2012-01-01T23:59:59.000Z

9

EE/RE Impacts on Emission Reductions  

E-Print Network (OSTI)

Hydro Dam at Elephant Butte, El Paso, TX Landfill Gas McCommas Bluff Landfill, Dallas, TX Biomass Aspen Power Biomass Plant, Lufkin, TX Geothermal Texas Geothermal Map Wind Green Mountain Energy Wind Farm, Fluvanna, Texas ESL-KT-13-12-02 CATEE 2013...-18 Savings (2002 to 2011) Electricity - $1,082 million Demand - $1,245 million Total - $2,327 million Emissions Reduction in 2011 3,723 tons-NOx/year, (About 413,974 cars) Demand Reduction in 2011 834 MW More than one power plant Electricity...

Haberl, J. S.

2013-01-01T23:59:59.000Z

10

No Significant Impact Effluent Reduction Los Alamos National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Finding of Finding of No Significant Impact Effluent Reduction Los Alamos National Laboratory Los Alamos, New Mexico U. S. Department of Energy Los Alamos Area Office 528 35th Street Los Alamos, NM 87544 DEPARTMENT OF ENERGY FINDING OF NO SIGNIFICANT IMPACT EFFLUENT REDUCTION LOS ALAMOS NATIONAL LABORATORY EFFLUENT REDUCTION FINAL ENVIRONMENTAL ASSESSMENT: The Environmental Assessment (EA) for Effluent Reduction (DOE/EA-1156) (attached) briefly provides sufficient evidence and analysis t o determine that a finding of no significant impact is appropriate for this action. The EA documents the evidence and analysis in the following chapters: 1. Purpose and Need for Agency Action; 2. Description of Alternatives; 3. Affected Environment and Environmental Consequences; 4. Abnormal Events; 5. Agencies

11

On the impact of playout scheduling on the performance of peer-to-peer live streaming  

Science Journals Connector (OSTI)

In this paper we examine the impact of the adopted playout policy on the performance of P2P live streaming systems. We argue and demonstrate experimentally that (popular) playout policies which permit the divergence of the playout points of different ... Keywords: Peer-to-peer streaming, Playout scheduling, Video streaming

Constantinos Vassilakis; Nikolaos Laoutaris; Ioannis Stavrakakis

2009-03-01T23:59:59.000Z

12

The Projected Impacts of Carbon Dioxide Emissions Reduction Legislation on  

E-Print Network (OSTI)

#12;The Projected Impacts of Carbon Dioxide Emissions Reduction Legislation on Electricity Prices on the projected prices of electricity and the use of electric energy in the state of Indiana. The analysis allowances and offsets, shifting production technology from coal-fired baseload resources to a combination

13

Energy Market Impacts of Alternative Greenhouse Gas Intensity Reduction Goals  

Gasoline and Diesel Fuel Update (EIA)

1 1 Energy Market Impacts of Alternative Greenhouse Gas Intensity Reduction Goals March 2006 Energy Information Administration Office of Integrated Analysis and Forecasting U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should be attributed to the Energy Information Administration and should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Service Reports are prepared by the Energy Information Administration upon special request and are based on assumptions specified by the requester. Energy Information Administration / Energy Market Impacts of Alternative Greenhouse Gas Intensity Reduction Goals

14

Job Communication Characterization and its Impact on Meta-scheduling Co-allocated Jobs in a Mini-grid  

E-Print Network (OSTI)

Job Communication Characterization and its Impact on Meta-scheduling Co-allocated Jobs in a Mini-grid;What is a Mini-grid ? Architecture LaboratoryResearch Parallel PARL µ Geographic co-location µ Improved scheduling 4 #12;Models Architecture LaboratoryResearch Parallel PARL µ Mini-grid t Homogeneous

Jones, William Michael

15

Impact of Biodiesel-Based Na on the Selective Catalytic Reduction...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact of Biodiesel-Based Na on the Selective Catalytic Reduction (SCR) of NOx Using Cu-zeolite Impact of Biodiesel-Based Na on the Selective Catalytic Reduction (SCR) of NOx Using...

16

Impacts of Optimized Cold & Hot Deck Reset Schedules on Dual Duct VAV Systems - Theory and Model Simulation  

E-Print Network (OSTI)

Impacts of Optimized Cold & Hot Deck Reset Schedules on Dual Duct VAV Systems - Theory and Model Simulation Mingsheng Liu, Ph.D., P.E. Energy Systems Laboratory Texas A&M University College Station, Texas Abstract Optimal hot and cold deck... rate increased from 30% to 70% of the maximum flow. Introduction Simultaneous heating and cooling can be reduced sigmficantly by optimizing cold and hot deck reset schedules in dual duct constant volume systems [Liu et. a1 1994, 1995, 19961...

Liu, M.; Claridge, D. E.

1998-01-01T23:59:59.000Z

17

Job Communication Characterization and its Impact on Meta-scheduling Co-allocated Jobs in a Mini-grid  

E-Print Network (OSTI)

Job Communication Characterization and its Impact on Meta-scheduling Co-allocated Jobs in a Mini-grid in a mini-grid. Our model captures the time-varying utilization of shared inter-cluster network resources naturally lends itself to the for- mation of a mini-grid [7]. A mini-grid is distinguished from

Jones, William Michael

18

Energy dispatch schedule optimization for demand charge reduction using a photovoltaic-battery storage system with solar forecasting  

Science Journals Connector (OSTI)

Abstract A battery storage dispatch strategy that optimizes demand charge reduction in real-time was developed and the discharge of battery storage devices in a grid-connected, combined photovoltaic-battery storage system (PV+system) was simulated for a summer month, July 2012, and a winter month, November 2012, in an operational environment. The problem is formulated as a linear programming (LP; or linear optimization) routine and daily minimization of peak non-coincident demand is sought to evaluate the robustness, reliability, and consistency of the battery dispatch algorithm. The LP routine leverages solar power and load forecasts to establish a load demand target (i.e., a minimum threshold to which demand can be reduced using a photovoltaic (PV) array and battery array) that is adjusted throughout the day in response to forecast error. The LP routine perfectly minimizes demand charge but forecasts errors necessitate adjustments to the perfect dispatch schedule. The PV+system consistently reduced non-coincident demand on a metered load that has an elevated diurnal (i.e., daytime) peak. The average reduction in peak demand on weekdays (days that contain the elevated load peak) was 25.6% in July and 20.5% in November. By itself, the PV array (excluding the battery array) reduced the peak demand on average 19.6% in July and 11.4% in November. PV alone cannot perfectly mitigate load spikes due to inherent variability; the inclusion of a storage device reduced the peak demand a further 6.0% in July and 9.3% in November. Circumstances affecting algorithm robustness and peak reduction reliability are discussed.

R. Hanna; J. Kleissl; A. Nottrott; M. Ferry

2014-01-01T23:59:59.000Z

19

Energy Efficiency/ Renewable Energy Impact in The Texas Emissions Reduction Plan (TERP): Volume I- Summary Report  

E-Print Network (OSTI)

this sixth annual report, Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan (Preliminary Report) to the Texas Commission on Environmental Quality. In this preliminary report, the NOx emissions savings from the energy...

Haberl, J.; Yazdani, B.; Lewis, C.; Liu, Z.; Baltazar, J. C.; Mukhopadhyay, J..; Degelman, L.; McKelvey, K.; Clardige, D.; Ellis, S.; Kim, H.; Zilbershtein. G.; Gilman, D.

2012-01-01T23:59:59.000Z

20

Energy Efficiency/ Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP) Volume I - Summary Report  

E-Print Network (OSTI)

ninth annual report, Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan (TERP) to the Texas Commission on Environmental Quality. The report is organized in three volumes. Volume I - Summary Report - provides...

Haberl, J.; Yazdani, B.; Zilbershtein, G.; Baltazar, J. C.; Mukhopadhyay, J.; Clardige, D.; Parker, P.; Ellis, S.; Kim, H.; Gilman, D.; Degelman, L.

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Energy Efficiency/ Renewable Energy Impact in the Texas Emisions Reduction Plan (TERP): Volume II- Technical Report  

E-Print Network (OSTI)

ninth annual report, Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan (TERP) to the Texas Commission on Environmental Quality. The report is organized in three volumes. Volume I - Summary Report - provides...

Haberl, J.; Yazdani, B.; Culp, C.; Lewis, C.; Liu, Z.; Baltazar, J. C.; Mukhopadhyay, J.; Gilman, D.; Degelman, L.; McKelvey, K.; Clardige, D.

2011-01-01T23:59:59.000Z

22

Energy Efficiency/ Renewable Energy Impact in the Texas Emisions Reduction Plan (TERP): Volume I- Summary Report  

E-Print Network (OSTI)

ninth annual report, Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan (TERP) to the Texas Commission on Environmental Quality. The report is organized in three volumes. Volume I - Summary Report - provides...

Haberl, J.; Yazdani, B.; Culp, C.; Lewis, C.; Liu, Z.; Baltazar, J. C.; Mukhopadhyay, J.; Gilman, D.; Degelman, L.; McKelvey, K.; Clardige, D.

2011-01-01T23:59:59.000Z

23

Potential Impacts of Reductions in Refinery Activity on Northeast Petroleum Product Markets  

Reports and Publications (EIA)

Potential Impacts of Reductions in Refinery Activity on Northeast Petroleum Product Markets is an update to a previous Energy Information Administration (EIA) report, Reductions in Northeast Refining Activity: Potential Implications for Petroleum Product Markets, released in December 2011. This update analyzes possible market responses and impacts in the event Sunoco's Philadelphia refinery closes this summer, in addition to the recently idled refineries on the East Coast and in the U.S. Virgin Islands.

2012-01-01T23:59:59.000Z

24

Energy Efficiency and Renewable Energy Impacts on Emission Reductions  

E-Print Network (OSTI)

reductions are surplus as long as they are not otherwise relied on to meet air quality attainment requirements in air quality programs related to your SIP. Enforceability: Measures that reduce emissions from electricity generation may be: (1) Enforceable...-family construction oESL Multi-family construction oESL Commercial construction 2. Green Power Production: Wind and other renewables 3. PUC SB7: Energy efficiency programs implemented by electric utilities under the Public Utility Regulatory Act 39.905 4. SECO...

Haberl,J; Bahman,Y.

2014-01-01T23:59:59.000Z

25

Impact of Schedule Duration on Head and Neck Radiotherapy: Accelerated Tumor Repopulation Versus Compensatory Mucosal Proliferation  

SciTech Connect

Purpose: To determine how modelled maximum tumor control rates, achievable without exceeding mucositis tolerance (tcp{sub max-early}) vary with schedule duration for head and neck squamous cell carcinoma (HNSCC). Methods and materials: Using maximum-likelihood techniques, we have fitted a range of tcp models to two HNSCC datasets (Withers' and British Institute of Radiology [BIR]), characterizing the dependence of tcp on duration and equivalent dose in 2 Gy fractions (EQD{sub 2}). Models likely to best describe future data have been selected using the Akaike information criterion (AIC) and its quasi-AIC extension to overdispersed data. Setting EQD{sub 2}s in the selected tcp models to levels just tolerable for mucositis, we have plotted tcp{sub max-early} against schedule duration. Results: While BIR dataset tcp fits describe dose levels isoeffective for tumor control as rising significantly with schedule protraction, indicative of accelerated tumor repopulation, repopulation terms in fits to Withers' dataset do not reach significance after accounting for overdispersion of the data. The tcp{sub max-early} curves calculated from tcp fits to the overall Withers' and BIR datasets rise by 8% and 0-4%, respectively, between 20 and 50 days duration; likewise, tcp{sub max-early} curves calculated for stage-specific cohorts also generally rise slowly with increasing duration. However none of the increases in tcp{sub max-early} calculated from the overall or stage-specific fits reach significance. Conclusions: Local control rates modeled for treatments which lie just within mucosal tolerance rise slowly but insignificantly with increasing schedule length. This finding suggests that whereas useful gains may be made by accelerating unnecessarily slow schedules until they approach early reaction tolerance, little is achieved by shortening schedules further while reducing doses to remain within mucosal tolerance, an approach that may slightly worsen outcomes.

Fenwick, John D., E-mail: john.fenwick@rob.ox.ac.uk [School of Cancer Studies, University of Liverpool, Liverpool L69 3GA (United Kingdom); Department of Physics, Clatterbridge Centre for Oncology, Wirral CH63 4JY (United Kingdom); Pardo-Montero, Juan [School of Cancer Studies, University of Liverpool, Liverpool L69 3GA (United Kingdom); Department of Physics, Clatterbridge Centre for Oncology, Wirral CH63 4JY (United Kingdom); Nahum, Alan E. [Department of Physics, Clatterbridge Centre for Oncology, Wirral CH63 4JY (United Kingdom); Malik, Zafar I. [Department of Clinical Oncology, Clatterbridge Centre for Oncology, Wirral CH63 4JY (United Kingdom)

2012-02-01T23:59:59.000Z

26

Short mechanical biological treatment of municipal solid waste allows landfill impact reduction saving waste energy content  

Science Journals Connector (OSTI)

Abstract The aim of this work was to evaluate the effects of full scale MBT process (28 d) in removing inhibition condition for successive biogas (ABP) production in landfill and in reducing total waste impact. For this purpose the organic fraction of MSW was treated in a full-scale MBT plant and successively incubated vs. untreated waste, in simulated landfills for one year. Results showed that untreated landfilled-waste gave a total ABP reduction that was null. On the contrary MBT process reduced ABP of 44%, but successive incubation for one year in landfill gave a total ABP reduction of 86%. This ABP reduction corresponded to a MBT process of 22weeks length, according to the predictive regression developed for ABP reduction vs. MBT-time. Therefore short MBT allowed reducing landfill impact, preserving energy content (ABP) to be produced successively by bioreactor technology since pre-treatment avoided process inhibition because of partial waste biostabilization.

Barbara Scaglia; Silvia Salati; Alessandra Di Gregorio; Alberto Carrera; Fulvia Tambone; Fabrizio Adani

2013-01-01T23:59:59.000Z

27

Green Scheduling of Control Systems for Peak Demand Reduction Truong X. Nghiem, Madhur Behl, Rahul Mangharam and George J. Pappas  

E-Print Network (OSTI)

and refrigeration operate independently of each other and frequently result in temporally correlated energy demand of energy demand by scheduling the control systems within a constrained peak while ensuring custom climate and refrigeration (HVAC&R) systems, chiller sys- tems, and lighting systems operate independently of each other

Pappas, George J.

28

Modeling of CO2 Reduction Impacts on Energy Prices with Modelica Philip Machanick1  

E-Print Network (OSTI)

, Peter Fritzson1,2 1 School ITEE, University of Queensland, Australia 2 PELAB, Department of ComputerModeling of CO2 Reduction Impacts on Energy Prices with Modelica Philip Machanick1 , Ariel Liebman1 at the ap- propriate rate. In this paper we present a Modelica model which explores the trade

Machanick, Philip

29

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP)  

E-Print Network (OSTI)

, Degration, T&D losses INTEGRATED NOx SAVINGS Energy Systems Laboratory p. 4 CUMULATIVE NOx EMISSIONS SAVINGS (2013) ? ESL Code Compliance (10.75 tons/day) ? Federal Buildings (0.81 tons/day) ? Furnace Pilot Lights (0.32 tons/day) ? PUCs SB7,SB5...1 Energy Systems Laboratory p. 1 Energy Systems Laboratory Texas Engineering Experiment Station Texas A&M University System Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP) September 2001 ? December...

Haberl, J. S.; Yazdani, B.; Culp, C.

30

The Schedule  

Directives, Delegations, and Requirements

The schedule is one of the building blocks for project development. A schedule helps determine the duration of the project, the critical activities, and when funds are required. This chapter will briefly discuss some scheduling basics.

1997-03-28T23:59:59.000Z

31

The impact of master scheduling models on student performance as identified by the Academic Excellence Indicator System (AEIS) database in the high schools of the San Antonio Independent School District, San Antonio, Texas  

E-Print Network (OSTI)

This study determined the impact of master scheduling models on student performance as reported by the AEIS database in the high schools of the SAISD. General student performance and the Texas Assessment of Knowledge and Skills were the primary...

Morgan, Scott Edwin

2005-11-01T23:59:59.000Z

32

Reduction of Electric Vehicle Life-Cycle Impacts through Battery Recycling  

NLE Websites -- All DOE Office Websites (Extended Search)

Reduction of Electric Vehicle Life-Cycle Impacts through Battery Recycling 29 th International Battery Seminar and Exhibit Ft. Lauderdale, FL March 15, 2012 The submitted manuscript has been created by UChicago Argonne, LLC, Operator of Argonne National Laboratory ("Argonne"). Argonne, a U.S. Department of Energy Office of Science laboratory, is operated under Contract No. DE-AC02-06CH11357. The U.S. Government retains for itself, and others acting on its behalf, a paid-up nonexclusive, irrevocable worldwide license in said article to reproduce, prepare derivative works, distribute copies to the public, and perform publicly and display publicly, by or on behalf of the Government. Why think about recycling?  Material scarcity alleviated

33

IMPACTS OF ANTIFOAM ADDITIONS AND ARGON BUBBLING ON DEFENSE WASTE PROCESSING FACILITY REDUCTION/OXIDATION  

SciTech Connect

During melting of HLW glass, the REDOX of the melt pool cannot be measured. Therefore, the Fe{sup +2}/{Sigma}Fe ratio in the glass poured from the melter must be related to melter feed organic and oxidant concentrations to ensure production of a high quality glass without impacting production rate (e.g., foaming) or melter life (e.g., metal formation and accumulation). A production facility such as the Defense Waste Processing Facility (DWPF) cannot wait until the melt or waste glass has been made to assess its acceptability, since by then no further changes to the glass composition and acceptability are possible. therefore, the acceptability decision is made on the upstream process, rather than on the downstream melt or glass product. That is, it is based on 'feed foward' statistical process control (SPC) rather than statistical quality control (SQC). In SPC, the feed composition to the melter is controlled prior to vitrification. Use of the DWPF REDOX model has controlled the balanjce of feed reductants and oxidants in the Sludge Receipt and Adjustment Tank (SRAT). Once the alkali/alkaline earth salts (both reduced and oxidized) are formed during reflux in the SRAT, the REDOX can only change if (1) additional reductants or oxidants are added to the SRAT, the Slurry Mix Evaporator (SME), or the Melter Feed Tank (MFT) or (2) if the melt pool is bubble dwith an oxidizing gas or sparging gas that imposes a different REDOX target than the chemical balance set during reflux in the SRAT.

Jantzen, C.; Johnson, F.

2012-06-05T23:59:59.000Z

34

PILOT-SCALE EVALUATION OF THE IMPACT OF SELECTIVE CATALYTIC REDUCTION FOR NOx ON MERCURY SPECIATION  

SciTech Connect

Full-scale tests in Europe and bench-scale tests in the United States have indicated that the catalyst, normally vanadium/titanium metal oxide, used in the selective catalytic reduction (SCR) of NO{sub x}, may promote the formation of Hg{sup 2+} and/or particulate-bound mercury (Hg{sub p}). To investigate the impact of SCR on mercury speciation, pilot-scale screening tests were conducted at the Energy & Environmental Research Center. The primary research goal was to determine whether the catalyst or the injection of ammonia in a representative SCR system promotes the conversion of Hg{sup 0} to Hg{sup 2+} and/or Hg{sub p} and, if so, which coal types and parameters (e.g., rank and chemical composition) affect the degree of conversion. Four different coals, three eastern bituminous coals and a Powder River Basin (PRB) subbituminous coal, were tested. Three tests were conducted for each coal: (1) baseline, (2) NH{sub 3} injection, and (3) SCR of NO{sub x}. Speciated mercury, ammonia slip, SO{sub 3}, and chloride measurements were made to determine the effect the SCR reactor had on mercury speciation. It appears that the impact of SCR of NO{sub x} on mercury speciation is coal-dependent. Although there were several confounding factors such as temperature and ammonia concentrations in the flue gas, two of the eastern bituminous coals showed substantial increases in Hg{sub p} at the inlet to the ESP after passing through an SCR reactor. The PRB coal showed little if any change due to the presence of the SCR. Apparently, the effects of the SCR reactor are related to the chloride, sulfur and, possibly, the calcium content of the coal. It is clear that additional work needs to be done at the full-scale level.

Dennis L. Laudal; John H. Pavlish; Kevin C. Galbreath; Jeffrey S. Thompson; Gregory F. Weber; Everett Sondreal

2000-12-01T23:59:59.000Z

35

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Vol. II - Technical Report  

E-Print Network (OSTI)

ESL-TR-06-06-08 ENERGY EFFICIENCY/RENEWABLE ENERGY IMPACT IN THE TEXAS EMISSIONS REDUCTION PLAN (TERP) VOLUME II ? SUMMARY REPORT Annual Report to the Texas Commission on Environmental Quality September 2004 ? December 2005..., the following results were determined for energy-code compliant new residential single- and multi-family construction in non-attainment and affected counties built in 2004: ? The annual savings in 2005 amounted to 348,794 megawatt hours (MWh...

Haberl, J. S.; Culp, C.; Yazdani, B.; Gilman, D.; Fitzpatrick, T.; Muns, S.; Verdict, M.; Ahmed, M.; Liu, Z.; Baltazar-Cervantes, J. C.; Degelman, L. O.; Turner, W. D.

2006-11-01T23:59:59.000Z

36

Rate Schedules  

Energy.gov (U.S. Department of Energy (DOE))

One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate...

37

ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES This...

38

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP): Volume I  

E-Print Network (OSTI)

by adding the following additional energy efficiency initiatives: ? Requires 5,880 MW of generating capacity from renewable energy technologies by 2015; ? Includes 500 MW from non-wind renewables; ? Requires the PUCT to establish a target of 10... emissions reduction credits from energy efficiency and renewable energy programs; ? Requires the Texas Environmental Research Consortium (TERC) to contract with the Laboratory to develop and annually calculate creditable emissions reduction from wind...

Haberl, Jeff; Culp, Charles; Yazdani, Bahman; Gilman, Don; Fitzpatrick, Tom; Muns, Shirley; Liu, Zi; Baltazar, Juan Carlos; Mukhopadhyay, Jaya; Degelman, Larry; Claridge, David

39

SI Group Scheduling Page  

NLE Websites -- All DOE Office Websites (Extended Search)

Personnel On-Call Page Beamline Validation Schedule Group Organizational Chart Reviews Presentations Group Scheduling Page Project Scheduling Information Ops Scheduling Info Project / Scheduling Info APS fy2005 Annual Schedule ( html ) PSS Validation Schedule APS fy2006 Annual Schedule (html) PSS Validation Teams Latest Machine Studies Schedule (pdf) (html) New Builds Schedule (For SI GROUP Reference Only) Parasitic Beam Operations Schedule Ops Scheduling Page Shutdown Information Work Schedules August/September Shutdown Shutdown Work List Validation Schedule Safety Info Work Request Links ISM Core Functions Enter / Search Work Requests APS Safety Page Modify / Approve Work Requests Radiation Safety Policy APS TMS Training Profiles MSDS Search This page maintained by Joe Budz

40

Study of anticipated impact on DOE programs from proposed reductions to the external occupational radiation exposure limit  

SciTech Connect

A study of the impact of reducing the occupational radiation exposure limit from 5 rem/yr to 2.5, 1.0 and 0.5 rem/yr, respectively produced the following conclusions: reduction of the occupational exposure limit would result in significant increase in total accumulated exposure to the current radiation worker population and could require an increase in the work force; important programs would have to be abandoned at a planned exposure limit of 0.5 rem/yr; some engineering technology is not sufficiently developed to design or operate at the 0.5 rem/yr limit; even a factor of 2 reduction (2.5 rem/yr) would significantly increase costs and would result in an increase in total exposure to the work force; in addition to a significant one-time initial capital cost resulting from a 0.5 rem/yr limit, there would be a significant increase in annual costs; the major emphasis in controlling occupational exposure should be on further reduction of total man-rem; and current standards are used only as a limit. For example, 97% of the employees receive less than 0.5 rem/yr.

None

1981-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Life cycle assessment of 50MW wind firms and strategies for impact reduction  

Science Journals Connector (OSTI)

The world today is continuously striving toward a carbon neutral clean energy technology. Hence, renewable wind power systems are increasingly receiving the attention of mankind. Energy production with structurally more promising and economically more competitive design is no more the sole criterion while installing new megawatt (MW) range of turbines. Rather important life cycle analysis (LCA) issues like climate change, ozone layer depletion, effect on surrounding environments e.g. eco-system quality, natural resources and human health emerge as dominant factors from green energy point of view. Hence, the study covers life cycle impact analysis (LCIA) of three wind farms: one onshore horizontal, one offshore horizontal, another vertical axis. It appears that vertical axis wind farm generates per unit electricity with lowest impact followed by horizontal offshore and horizontal onshore farms. The study, henceforward, discovers most adverse impact contributing materials in today's multi megawatt wind turbines and subsequently substitutes copper, the topmost impact contributor, with more eco-friendly aluminum alloys and its corresponding process routes. In this process, it reduces overall life cycle impacts up to 30% for future greener wind farms. In later stages, it compares all major electricity production technologies, viz., oil, diesel, coal, natural gas, wind, solar, biomass, nuclear, hydro plant in a common platform which demonstrates the wind farms performing the best except the hydro-kinetic ones. However, as the study suggests, offshore VAWT farm may even perform better than hydro-kinetic farms because of higher capacity factors in the high sea. Findings from the study can be deployed to harness massive scale green electricity from environmentally more clean and green turbines.

A. Rashedi; I. Sridhar; K.J. Tseng

2013-01-01T23:59:59.000Z

42

Rate schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Firm Power Service Provided by Rate/Charges Firm Power Service Provided by Rate/Charges Rate/Charges Effective Through (or until superceded) Firm Sales (SLIP-F9) Composite Rate SLIP 29.62 mills/kWh 9/30/2015 Demand Charge SLIP $5.18/kW-month 9/30/2015 Energy Charge SLIP 12.19 mills/kWh 9/30/2015 Cost Recovery Charge (CRC) SLIP 0 mills/kWh 9/30/2015 Transmission Service Provided by Current Rates effective10/12 - 9/15 (or until superceded) Rate Schedule Effective Through Firm Point-to-Point Transmission (SP-PTP7) CRSP $1.14 per kW-month $13.69/kW-year $0.00156/kW-hour $0.04/kW-day $0.26/kW-week 10/1/2008-9/30/2015 Network Integration Transmission (SP-NW3) CRSP see rate schedule 10/1/2008-9/30/2015 Non-Firm Point-to-Point Transmission (SP-NFT6) CRSP see rate schedule 10/1/2008-9/30/2015 Ancillary Services Provided by Rate Rate Schedule

43

Presentation Schedule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Presentation Schedule Presentation Schedule (30 Min) Dave Wade - Dose Comparisons of once-thru and closed fuel cycles. (30 Min) Ralph Bennett - Roadmap Overview (15 Min) Neil Todreas - GRNS Perspectives and Recommendations (75 Min) Neil Todreas / - NERAC DISCUSSION Sal Levy 2 Generation IV Roadmap NERAC Subcommittee (GRNS) Bobby Abrams* Duke Engineering Douglas Chapin MPR Associates B. John Garrick Independent Consultant Dan Kammen University of California- Berkeley 3 Salomon Levy ** Levy & Associates Ted Marston Electrical Power Research Institute Bill Naughton Exelon Neil Todreas ** Massachusetts Institute of Technology * Resigned, July 2002 ** Co-chair GRNS Recruited Working Group Co-Chairs Jack Devine TWG-1 Water Cooled Phil Hildebrandt TWG-2 Gas Cooled Steve Rosen TWG-3 Metal Cooled Bill Rasin

44

Shifts & Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Shifts & Schedules This page provides links to the various shifts and schedules that are used by the User ESH Support Group. FC Shift Schedule This page lists the current Operational Shift Schedule for the Floor Coordinators. FC DOR Schedule This page lists the current DOR Schedule for the Floor Coordinators. FC Off Shift Pager Schedule This tool lists the current schedule for the Floor Coordinator carring the 0101 during APS Shutdown periods. Long Range Operations Schedule This page lists the schedule of Operations for the current APS fiscal year. Machine Studies Schedule This page lists the current schedule of Operations for the Accelerator Systems during Machine Studies. PSS Validation Schedule This page lists the beamlines currently scheduled to have their Personnel Safety Systems validated.

45

Impact of Sr segregation on the electronic structure and oxygen reduction activity of SrTi1xFexO3 surfaces  

E-Print Network (OSTI)

active cathode materials, a deeper under- standing of the correlation between the cathode surface, to explain the impact of Sr segregation on the oxygen reduction activity of cathodes in solid oxide fuel to decrease the SOFC working temperature to an intermediate range ($500 to 700 C), new cathode materials

Yildiz, Bilge

46

Project Schedule Optimization in a Telecommunications Environment  

E-Print Network (OSTI)

Veritas Corporation is a thriving company in the fast-paced telecommunications industry. To keep up with the dynamic industry, a significant quantity of projects must be scheduled in a short time period without impacting ...

Taliaferro, Chris

2013-12-20T23:59:59.000Z

47

Impact of the deployment schedule of fast breeding reactors in the frame of French act for nuclear materials and radioactive waste management  

SciTech Connect

In the frame of the French Act of June 28, 2006 on 'a sustainable management of nuclear materials and radioactive waste' EDF R and D assesses various research scenarios of transition between the actual French fleet and a Generation IV fleet with a closed fuel cycle where plutonium is multi-recycled. The basic scenarios simulate a deployment of 60 GWe of Sodium-cooled Fast Reactors (SFRs) in two steps: one third from 2040 to 2050 and the rest from 2080 to 2100 (scenarios 2040). These research scenarios assume that SFR technology will be ready for industrial deployment in 2040. One of the many sensitivity analyses that EDF, as a nuclear power plant operator, must evaluate is the impact of a delay of SFR technology in terms of uranium consumptions, plutonium needs and fuel cycle utilities gauging. The sensitivity scenarios use the same assumptions as scenarios 2040 but they simulate a different transition phase: SFRs are deployed in one step between 2080 and 2110 (scenarios 2080). As the French Act states to conduct research on minor actinides (MA) management, we studied different options for 2040 and 2080 scenarios: no MA transmutation, americium transmutation in heterogeneous mode based on americium Bearing Blankets (AmBB) in SFRs and all MA transmutation in heterogeneous mode based on MA Bearing Blankets (MABB). Moreover, we studied multiple parameters that could impact the deployment of these reactors (SFR load factor, increase of the use of MOX in Light Water Reactors, increase of the cooling time in spent nuclear fuel storage...). Each scenario has been computed with the EDF R and D fuel cycle simulation code TIRELIRE-STRATEGIE and optimized to meet various fuel cycle constraints such as using the reprocessing facility with long period of constant capacity, keeping the temporary stored mass of plutonium and MA under imposed limits, recycling older assemblies first... These research scenarios show that the transition from the current PWR fleet to an equivalent fleet of Generation IV SFR can follow different courses. The design of SFR-V2B that we used in our studies needs a high inventory of plutonium resulting in tension on this resource. Several options can be used in order to loosen this tension: our results lead to favour the use of axial breeding blanket in SFR. Load factor of upcoming reactors has to be regarded with attention as it has a high impact on plutonium resource for a given production of electricity. The deployment of SFRs beginning in 2080 instead of 2040 following the scenarios we described creates higher tensions on reprocessing capacity, separated plutonium storage and spent fuel storage. In the frame of the French Act, we studied minor actinides transmutation. The flux of MA in all fuel cycle plants is really high, which will lead to decay heat, a and neutron emission related problems. In terms of reduction of MA inventories, the deployment of MA transmutation cycle must not delay the installation of SFRs. The plutonium production in MABB and AmBB does not allow reducing the use of axial breeding blankets. The impact of MA or Am transmutation over the high level waste disposal is more important if the SFRs are deployed later. Transmutation option (americium or all MA) does not have a significant impact on the number of canister produced nor on its long-term thermal properties. (authors)

Le Mer, J.; Garzenne, C.; Lemasson, D. [Electricite de France R and D, 1, Avenue du General De Gaulle, 92141 Clamart (France)

2012-07-01T23:59:59.000Z

48

Allocation Reductions  

NLE Websites -- All DOE Office Websites (Extended Search)

Allocation Allocation Reductions Quarterly Allocation Reductions MPP (or computational) repositories that haven't used significant amounts of time are adjusted at certain times by transferring a part of the unused balance to the corresponding DOE Office reserve. The following schedule will be used for allocation year 2014 (which runs 14 January 2014 through 132January 2015). On April 9: if usage is less than 10% remove 25% of the unused balance On July 9: if usage is less than 25% remove 25% of the unused balance if usage is less than 10% remove 50% of the unused balance On October 8: if usage is less than 50% remove 25% of the unused balance if usage is less than 25% remove 75% of the unused balance if usage is less than 10% remove 90% of the unused balance On November 5:

49

Implementing Lottery Scheduling: Matching the Specializations in Traditional Schedulers  

E-Print Network (OSTI)

present in traditional non- real time process schedulers. Lottery scheduling enables flexible control over this while maintaining lottery scheduling's flexible control over relative execution rates and loadImplementing Lottery Scheduling: Matching the Specializations in Traditional Schedulers David

50

DOE Administrative Records Schedules Changes | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administrative Records Schedules Changes DOE Administrative Records Schedules Changes Changes posted to Administrative Records Schedules DOE Administrative Records Schedules...

51

March 29, 2008 OS:CPU Scheduling 1 CPU Scheduling  

E-Print Network (OSTI)

control of the CPU to the process selected by the short-term scheduler. Its function involves: SwitchingMarch 29, 2008 OS:CPU Scheduling 1 CPU Scheduling #12;March 29, 2008 OS:CPU Scheduling 2 Objectives Basic Concepts + Scheduling Criteria + Scheduling Algorithms + Scheduling Algorithm Evaluation + Summary

Adam, Salah

52

Impact of Biodiesel-Based Na on the Selective Catalytic Reduction (SCR) of NOx Using Cu-zeolite  

Energy.gov (U.S. Department of Energy (DOE))

Discusses the impact of Na in biodiesel on three emission control devices: the diesel particulate filter, diesel oxidation catalyst, and zeolyte-based SCR catalyst

53

APCF Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

APCF APCF Past APCF Memoranda APCF, Construction Schedule This is a tentative schedule of the daily construction at APCF. For the preliminary two to three week look ahead schedule, please click the PDF calendar to the left. The potential for ground vibration is noted in the "Impact" column (None, Small, Moderate, High, Very High). Daily schedule for dates up to 01.17.2014 Day Activity Impact Monday - 08.05.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Site Grading Low Tuesday - 08.06.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Landscaping Low Wednesday - 08.07.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Landscaping Low Thursday - 08.08.13 Studs and Drywall None Ceiling Piping None Curtain Wall None

54

Disposition Schedules | Department of Energy  

Office of Environmental Management (EM)

Disposition Schedules Disposition Schedules The DOE Records Disposition Schedules provide the authority for the transfer, or disposal of records created and maintained by the...

55

Energy Reduction Techniques for Caches and Multiprocessors  

E-Print Network (OSTI)

Energy Reduction Techniques for Caches and Multiprocessors #12;#12;Energy Reduction Techniques-90-72298-03-4 Keywords: Energy reduction, Caches, Multi processor scheduling Cover design: Floris de Langen Copyright c the years. #12;#12;Energy Reduction Techniques for Caches and Multiprocessors Pepijn de Langen Abstract E

Kuzmanov, Georgi

56

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP) Volume I-Summary Report, Annual Report to the Texas Commission on Environmental Quality, January 2009-December 2009  

E-Print Network (OSTI)

report, 'Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan' to the Texas Commission on Environmental Quality. This report is organized in three volumes: Volume I - Summary Report - provides an executive summary...

Haberl, J.; Culp, C.; Yazdani, B.; Lewis, C.; Liu, Z.; Baltazar-Cervantes, J. C.; Mukhopadhyay, J.; Gilman, D.; Degelman, L.; McKelvey, K.; Claridge, D.

57

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume I--Summary Report, Annual Report to the Texas Commission on Environmental Quality, January 2008-December 2008  

E-Print Network (OSTI)

report, 'Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan' to the Texas Commission on Environmental Quality. This report is organized in three volumes: Volume I - Summary Report - provides an executive summary...

Baltazar, Juan-Carlos; Claridge, David; Yazdani, Bahman; Mukhopadhyay, Jaya; Liu, Zi; Muns, Shirley; Gilman, Don; Degelman, Larry; Haberl, Jeff; Culp, Charles

58

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume I - Summary Report, Annual Report to the Texas Commission on Environmental Quality, January 2006 - June 2007  

E-Print Network (OSTI)

report, 'Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan' to the Texas Commission on Environmental Quality. This report is organized in three volumes: Volume I - Summary Report - provides an executive summary...

Verdict, M.; Baltazar-Cervantes, J. C.; Yazdani, B.; Ahmed, M.; Degelman, L.; Muns, S.; Fitzpatrick, T.; Gilman, D.; Liu, Z.; Mukhopadhyay, J.; McKelvey, K.; Montgomery, C.; Haberl, J. S.; Culp, C.

2008-01-23T23:59:59.000Z

59

SSRL- Experimental Run Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

FY2008 Experimental Run Schedules 2008 Run Ends August 11, 2008. User Operations will resume November 2008. Operating Maintenance Beam Line Schedule FY2009 FY2008 X-ray (1-4,...

60

Impacts of halogen additions on mercury oxidation, in a slipstream selective catalyst reduction (SCR), reactor when burning sub-bituminous coal  

SciTech Connect

This paper presents a comparison of impacts of halogen species on the elemental mercury (Hg(0)) oxidation in a real coal-derived flue gas atmosphere. It is reported there is a higher percentage of Hg(0) in the flue gas when burning sub-bituminous coal (herein Powder River Basin (PRB) coal) and lignite, even with the use of selective catalytic reduction (SCR). The higher Hg(0) concentration in the flue gas makes it difficult to use the wet-FGD process for the mercury emission control in coal-fired utility boilers. Investigation of enhanced Hg(0) oxidation by addition of hydrogen halogens (HF, HCl, HBr, and HI) was conducted in a slipstream reactor with and without SCR catalysts when burning PRB coal. Two commercial SCR catalysts were evaluated. SCR catalyst no. 1 showed higher efficiencies of both NO reduction and Hg(0) oxidation than those of SCR catalyst no. 2. NH{sub 3} addition seemed to inhibit the Hg(0) oxidation, which indicated competitive processes between NH{sub 3} reduction and Hg(0) oxidation on the surface of SCR catalysts. The hydrogen halogens, in the order of impact on Hg(0) oxidation, were HBr, HI, and HCl or HF. Addition of HBr at approximately 3 ppm could achieve 80% Hg(0) oxidation. Addition of HI at approximately 5 ppm could achieve 40% Hg(0) oxidation. In comparison to the empty reactor, 40% Hg(0) oxidation could be achieved when HCl addition was up to 300 ppm. The enhanced Hg(0) oxidation by addition of HBr and HI seemed not to be correlated to the catalytic effects by both evaluated SCR catalysts. The effectiveness of conversion of hydrogen halogens to halogen molecules or interhalogens seemed to be attributed to their impacts on Hg(0) oxidation. 30 refs., 4 figs.

Yan Cao; Zhengyang Gao; Jiashun Zhu; Quanhai Wang; Yaji Huang; Chengchung Chiu; Bruce Parker; Paul Chu; Wei-ping Pan [Western Kentucky University (WKU), Bowling Green, KY (United States). Institute for Combustion Science and Environmental Technology (ICSET)

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

SRI2007 Conference - Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Home Registration Abstract Submission Proceedings Manuscript Review Conference Schedule Poster Session Satellite Workshops Conference Committee Accommodations Vendors Travel tips...

62

Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules  

SciTech Connect

The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

Center for Energy and Innovative Technologies; NEC Laboratories America Inc.; Cardoso, Goncalo; Stadler, Michael; Bozchalui, Mohammed C.; Sharma, Ratnesh; Marnay, Chris; Barbosa-Povoa, Ana; Ferrao, Paulo

2013-10-27T23:59:59.000Z

63

DOWNSTREAM IMPACTS OF SLUDGE MASS REDUCTION VIA ALUMINUM DISSOLUTION ON DWPF PROCESSING OF SAVANNAH RIVER SITE HIGH LEVEL WASTE - 9382  

SciTech Connect

The SRS sludge that was to become a major fraction of Sludge Batch 5 (SB5) for the Defense Waste Processing Facility (DWPF) contained a large fraction of H-Modified PUREX (HM) sludge, containing a large fraction of aluminum compounds that could adversely impact the processing and increase the vitrified waste volume. It is beneficial to reduce the non-radioactive fraction of the sludge to minimize the number of glass waste canisters that must be sent to a Federal Repository. Removal of aluminum compounds, such as boehmite and gibbsite, from sludge can be performed with the addition of NaOH solution and heating the sludge for several days. Preparation of SB5 involved adding sodium hydroxide directly to the waste tank and heating the contents to a moderate temperature through slurry pump operation to remove a fraction of this aluminum. The Savannah River National Laboratory (SRNL) was tasked with demonstrating this process on actual tank waste sludge in our Shielded Cells Facility. This paper evaluates some of the impacts of aluminum dissolution on sludge washing and DWPF processing by comparing sludge processing with and without aluminum dissolution. It was necessary to demonstrate these steps to ensure that the aluminum removal process would not adversely impact the chemical and physical properties of the sludge which could result in slower processing or process upsets in the DWPF.

Pareizs, J; Cj Bannochie, C; Michael Hay, M; Daniel McCabe, D

2009-01-14T23:59:59.000Z

64

A pipeline scheduling model  

E-Print Network (OSTI)

A PIPELINE SCHEDULING MODEL A Thesis by THOMAS MELVIN BEATTY Submitted to the Graduate College of Texas AAM University in partial fulfillment of the requirement for the degree of MASTER QF SCIENCE August 1975 Major Subject: Computing... Science R PIPELINE SCHEDULING MODEL A Thesis by THOMAS MELVIN BEATTY Approved as to style and content by: Chairman of ommittee Member (Head o f Department ) Member August 1975 ABSTRACT A PIPELINE SCHEDULING MODEL (August 1975) Thomas Melvin...

Beatty, Thomas Melvin

2012-06-07T23:59:59.000Z

65

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Vol. I - Summary Report  

E-Print Network (OSTI)

) on the impacts of energy conservation in state agencies and political subdivisions. The Laboratory has also requested data about electricity generated from wind turbines from the Electric Reliability Council of Texas (ERCOT). Total cumulative, integrated..., and green power provided by wind turbine3 renewable energy sources (i.e., ERCOT) programs: o energy efficiency savings from code-compliant new construction: 900.52 tons/year, and 4.47 tons/peak-OSD in 2009; and 1,167.49 tons/year with 5.75 tons...

Degelman, L. O.; Gilman, D.; Ahmed, M.; Yazdani, B.; Liu, Z.; Verdict, M.; Muns, S.; Baltazar-Cervantes, J. C.; Turner, W. D.; Haberl, J. S.; Culp, C.

2006-10-30T23:59:59.000Z

66

ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS...  

Office of Environmental Management (EM)

ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS This schedule covers accountable...

67

Optimal investment and scheduling of distributed energy resources with  

NLE Websites -- All DOE Office Websites (Extended Search)

investment and scheduling of distributed energy resources with investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules Title Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules Publication Type Journal Article LBNL Report Number LBNL-6471E Year of Publication 2013 Authors Cardoso, Gonçalo, Michael Stadler, Mohammad Bozchalui, Ratnesh Sharma, Chris Marnay, Ana Barbosa-Póvoa, and Paulo Ferrão Journal Energy Date Published 10/2013 Abstract The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

68

ADMINISTRATIVE RECORDS SCHEDULE 23:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES June 2007 Revision 1 This schedule provides for the disposal of certain records common to most offices. It covers administrative subject files; facilitative records such as suspense files, tracking and control records, calendars, and indexes; and documents of transitory value. This schedule does not apply to any materials determined to be non-record or to materials such as calendars or work schedules claimed as personal. Office Administrative Files described under item 1 are records retained by an originating office as its record of initiation of an action, request, or response to requests for information. This item may be applied only to separate administrative files containing such records as copies of

69

DOE/EA-1472: Finding of No Significant Impact for the Commercial Demonstration of the Low NOx Burner/Separated Over-Fire Air Integration System Emission Reduction Technology (03/11/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IMPACT IMPACT COMMERCIAL DEMONSRATION OF THE LOW NOx BURNER/SEPARATED OVER- FIRE AIR (LNB/SOFA) INTEGRATON SYSTEM EMISSION REDUCTION TECHNOLOGY HOLCOMB STATION SUNFLOWER ELECTRIC POWER CORPORATION FINNEY COUNTY, KANSAS AGENCY: U.S. Department of Energy (DOE) ACTION: Finding of No Significant Impact (FONSI) SUMMARY: The DOE has prepared an Environmental Assessment (EA), to analyze the potential impacts of the commercial application of the Low-NOx Burner/Separated Over-Fire Air (LNB/SOFA) integration system to achieve nitrogen oxide (NOx) emissions reduction at Sunflower's Holcomb Unit No. 1 (Holcomb Station), located near Garden City, in Finney County, Kansas. The Holcomb Station would be modified in three distinct phases to demonstrate the synergistic effect of layering NO,

70

Definition: Dynamic Interchange Schedule Or Dynamic Schedule | Open Energy  

Open Energy Info (EERE)

Schedule Or Dynamic Schedule Schedule Or Dynamic Schedule Jump to: navigation, search Dictionary.png Dynamic Interchange Schedule Or Dynamic Schedule A telemetered reading or value that is updated in real time and used as a schedule in the AGC/ACE equation and the integrated value of which is treated as a schedule for interchange accounting purposes. Commonly used for scheduling jointly owned generation to or from another Balancing Authority Area.[1] Related Terms balancing authority, balancing authority area, smart grid References ↑ Glossary of Terms Used in Reliability Standards An in LikeLike UnlikeLike You like this.Sign Up to see what your friends like. line Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Dynamic_Interchange_Schedule_Or_Dynamic_Schedule&oldid=502492

71

2014 CAMD Users Meeting Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Schedule Friday, April 25th, 2014 LTRC Transportation Training and Education Center (TTEC), 4099 Gourrier Avenue Printable Schedule here 8:00 - 8:30 - REGISTRATION Morning Session...

72

Reclaimer Scheduling: Complexity and Algorithms  

E-Print Network (OSTI)

Feb 17, 2014 ... Abstract: We study a number of variants of an abstract scheduling problem inspired by the scheduling of reclaimers in the stockyard of a coal...

Enrico Angelelli

2014-02-17T23:59:59.000Z

73

ADMINISTRATIVE RECORDS SCHEDULE 22:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADMINISTRATIVE RECORDS SCHEDULE 22: ADMINISTRATIVE RECORDS SCHEDULE 22: AUDIT/INVESTIGATIVE RECORDS June 2007 Revision 1 Section I of this schedule covers records associated with investigations other than those performed by the Office of the Inspector General (OIG). Types of investigations may include: routine and significant internal program investigations, specific purpose investigations, audits, inspections, appraisals, and management reviews. Investigations may be described or referred to as audits, appraisals, surveillance, self-assessments, management assessments, or evaluations. Investigations may be conducted by DOE or by its contractors. Section II covers records created by the Department's OIG investigations. OIG investigations serve to prevent or reduce waste and fraud in Departmental programs,

74

ADMINISTRATIVE RECORDS SCHEDULE 16:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 ADMINISTRATIVE RECORDS SCHEDULE 16: ADMINISTRATIVE MANAGEMENT RECORDS June 2007 Revision 1 This schedule covers those administrative management activities not covered by other Administrative Schedules. Included are disposable records created in the course of organizational planning, development, and simplification of procedures; records management activities; and administration of management improvement programs. See ADM 1 (items 12 and 13) for the disposition of case files on individuals involved in incentive award and similar types of management improvement programs. The organizational locations and titles of administrative management units vary. They may be scattered at numerous levels or locations, or may be centralized. For the purposes

75

ADMINISTRATIVE RECORDS SCHEDULE 11:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADMINISTRATIVE RECORDS SCHEDULE 11: ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS June 2007 Revision 1 This schedule provides for the disposal of all copies, wherever located in the Department, of records relating to space and maintenance, except as indicated below. Records documenting these functions pertain to the acquisition, allocation, utilization, and release of space and include related correspondence and reports submitted to the General Services Administration (or equivalent agency with similar Government-wide responsibilities) as directed by law and regulation (41 CFR 101-17); correspondence and forms relating to the compilation of directory service listings; identification credentials and related accountable records; requests for building and equipment services;

76

Administrative Records Schedule: Communication Records | Department...  

Office of Environmental Management (EM)

Administrative Records Schedule: Communication Records Administrative Records Schedule: Communication Records The principal records documenting communication function...

77

Implementing Lottery Scheduling: Matching the Specializations Traditional Schedulers  

E-Print Network (OSTI)

in traditional non­ real time process schedulers. Lottery scheduling enables flexible control over relative. We achieve this while maintaining lottery scheduling's flexible control over relative execution rates a recently troduced proportional­share scheduler that enables flexible control over relative rates which CPU

78

Symmetry in Scheduling Problems  

E-Print Network (OSTI)

Nov 16, 2010 ... one is determining production schedules for identical machines. ...... j(t)) gives the cost of generator j producing pj(t) units of electricity at time t.

2010-11-16T23:59:59.000Z

79

ADMINISTRATIVE RECORDS SCHEDULE 21:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS June 2007 Revision 1 This schedule covers audiovisual and related records created by or for Department and those acquired in the normal course of business. For audiovisual records that are not described in this schedule, an SF 115, Request for Records Disposition Authority, must be submitted to the National Archives and Records Administration (NARA). Audiovisual records include still and motion picture photography, graphic materials, and sound and video recordings. Related documentation includes (1) production files or other files documenting the creation, justification, ownership, and rights to the records and (2) finding aids used to identify or access the records. This schedule does not cover: (1) cartographic records, (2) remote sensing imagery

80

DOE Surpasses Cleanup Target Ahead of Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Surpasses Cleanup Target Ahead of Schedule Surpasses Cleanup Target Ahead of Schedule DOE Surpasses Cleanup Target Ahead of Schedule May 12, 2011 - 12:00am Addthis WASHINGTON, D.C. - The U.S. Department of Energy announced today it has surpassed one of the Obama Administration's High Priority Performance Goals five months ahead of schedule in its effort to clean up the legacy of the Cold War. Through a $6 billion American Recovery and Reinvestment Act investment, the Department's cleanup footprint has been reduced by 45 percent, from 931 square miles to 516 square miles. By achieving this reduction, the Department is on track to reduce its overall cleanup footprint by approximately 90 percent by 2015. Footprint reduction lowers costs associated with site surveillance and maintenance and helps protect the

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

DOE Records Disposition Schedule Changes | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Records Disposition Schedule Changes DOE Records Disposition Schedule Changes Disposition Schedule Changes DOE Records Disposition Schedule Changes More Documents & Publications...

82

HSO SPOTLIGHT No 01 2012 HSO Meeting Schedule for 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

HSO SPOTLIGHT No. 01-2012: 2012 Schedule of Quarterly HSO Meetings HSO SPOTLIGHT No. 01-2012: 2012 Schedule of Quarterly HSO Meetings What is the issue? Meeting and Training Schedule Why do we need this? Informational Who is impacted? HSOs What does the HSO need to do? This is an informational Spotlight only NOTICE: The information in all HSO Spotlights applies only at Department of Energy (DOE) Headquarters facilities in the Washington, DC area. They are not intended to apply at DOE field sites, which may have entirely different local procedures. The HSO Program Manager has established the schedule below for quarterly HSO meetings in 2012. Please note that the topics listed are subject to change. HSO Quarterly Meeting and Training Schedule 2011 10:00 to Noon each day FORS Date / Room

83

Schedules of Key Environmental Impact Statements | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Combustion Strategies A Conceptual Model for Partially PremixedLow-Temperature Diesel Combustion Based onIn-Cylinder Laser Diagnostics and Chemical Kinetics Modeling...

84

JGI - CSP Proposal Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Schedule Proposal Schedule CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | FAQ Small-scale Microbial/Metagenome Proposals - reviewed twice yearly Small-scale proposals for specific types of microbial and metagenome projects are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for submission is 60 days prior to the review date. Next review dates (submission deadline in parentheses): January 2014 (Nov 22, 2013) July 2014 (May 23, 2014) Submit small-scale microbial/metagenome proposals anytime using the Work Initiation Process (WIP) interface. Synthetic Biology proposals Synthetic biology proposals are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for

85

SRS CAB - Meeting Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

SRS CAB Meeting Schedule SRS CAB Meeting Schedule Savannah River Site - Citizens Advisory Board 2013 Schedule To join current Online Meetings or view archived Online Meetings click on the buttons in the right-hand column. CAB Full Board and Combined Committees Meetings are not presented in the Online Meeting format. Instructions for Accessing Committee Meetings Online To request a copy of an archived online meeting, scroll down to the date of the meeting you wish to request, and click on the green "Request Archived Online Meeting" button. Your email browser will open and generate a new email to srscitizensadvisoryboard@srs.gov with the committee meeting you wish to request in the subject line. Please, include your name and mailing address in the body of the email. Once we receive the email, we will send

86

NERSC Holiday Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

NERSC NERSC Holiday Schedule NERSC Holiday Schedule December 20, 2013 by Francesca Verdier (0 Comments) All NERSC computing and storage systems will remain in full operation throughout the holiday season (Tuesday December 24 through Wednesday January 1). From Tuesday December 24 through Wednesday January 1, NERSC Consulting and Account Support services will be available *only* on Friday December 27 and Monday December 30, from 8:00 to 5:00 Pacific Time. Normal Consulting and Account Support schedules will resume on Thursday, January 2. As always, critical system problems may be reported at any time to NERSC Operations at 1-800-666-3772, menu option 1, or 1-510-486-6821. You should also contact Operations if you need to have your password reset (or login failures cleared) over the holidays.

87

ADMINISTRATIVE RECORDS SCHEDULE 20:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20: 20: ELECTRONIC RECORDS April 2008 Revision 2 This schedule authorizes the disposition of specified electronic records and hard-copy or microform records and are integrally related to them. The electronic records may either be created or received. Included are records created by computer operators, programmers, analysts, systems administrators, and all personnel with access to a computer. Disposition authority is provided for certain master files, including some tables that are components of data base management systems, and certain files created from master files for specific purposes. In addition, this schedule covers certain disposable electronic records produced by end users in office automation applications. These disposition authorities apply to the

88

GENERAL RECORDS SCHEDULE 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

39 39 DEPARTMENT OF ENERGY ADMIN1STRATIVE RECORDS SCHEDULE 1: PERSONNEL RECORDS June 2007 Revision 2 As do all Administrative Records Schedules (ADMs), ADM-1 covers records of the Department and its contractors. The records include, employee concerns programs, labor agreements and negotiations, labor relations, academic and outreach programs, apprenticeship programs, job vacancies, unemployment compensation, recruitment and employee health. The most important types of records are the Official Personnel Folders, the Service Record Cards, and the Employee Medical Folders. Those for Federal employees are maintained according to The Guide to Personnel Recordkeeping, an Office of Personnel Management directive that prescribes a system of recordkeeping for Federal

89

EGov PMA Scorecard Cost, Schedule & Performance Standard...  

Energy Savers (EERE)

EGov PMA Scorecard Cost, Schedule & Performance Standard.tif EGov PMA Scorecard Cost, Schedule & Performance Standard.tif EGov PMA Scorecard Cost, Schedule &...

90

Technological cost-reduction pathways for attenuator wave energy converters in the marine hydrokinetic environment.  

SciTech Connect

This report considers and prioritizes the primary potential technical costreduction pathways for offshore wave activated body attenuators designed for ocean resources. This report focuses on technical research and development costreduction pathways related to the device technology rather than environmental monitoring or permitting opportunities. Three sources of information were used to understand current cost drivers and develop a prioritized list of potential costreduction pathways: a literature review of technical work related to attenuators, a reference device compiled from literature sources, and a webinar with each of three industry device developers. Data from these information sources were aggregated and prioritized with respect to the potential impact on the lifetime levelized cost of energy, the potential for progress, the potential for success, and the confidence in success. Results indicate the five most promising costreduction pathways include advanced controls, an optimized structural design, improved power conversion, planned maintenance scheduling, and an optimized device profile.

Bull, Diana L; Ochs, Margaret Ellen

2013-09-01T23:59:59.000Z

91

Project Scheduling (3) Corequisite  

E-Print Network (OSTI)

) CMGT 111 Construction Materials & Methods Lab (1) CMGT 460 Project Cost Controls (3) FA SP CMGT 320 FASYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro) CMGT 475 Construction Project Management (3) MATH 108 College Algebra (4) Construction Elective

Barrash, Warren

92

Project Scheduling (3) Corequisite  

E-Print Network (OSTI)

460 Project Cost Controls (3) FA SP FA CE 210/211 Surveying & Lab (3) CMGT 410 Concrete FormworkSYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro Construction Project Management (3) MATH 108 College Algebra (4) MGMT 301 Leadership Skills (3) ENGL 101

Barrash, Warren

93

Energy Efficiency / Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Vol. II Technical ReportAnnual Report to the Texas Commission on Environmental Quality, Sept. 2003 to Aug. 2004  

E-Print Network (OSTI)

ESL-TR-04/12-04 ENERGY EFFICIENCY / RENEWABLE ENERGY IMPACT IN THE TEXAS EMISSIONS REDUCTION PLAN (TERP) VOLUME II ? TECHNICAL REPORT Annual Report to the Texas Commission on Environmental Quality September 2003 ? August 2004... Degelman, P.E. Dan Turner, Ph.D., P.E. December 2004 ENERGY SYSTEMS LABORATORY Texas Engineering Experiment Station Texas A&M University System TERP Report, Vol. II, p. 1 December 2004 Energy Systems Laboratory, Texas A...

Degelman, L. O.; Yazdani, B.; Fitzpatrick, T.; Verdict, M.; Liu, Z.; Muns, S.; Ahmad, M.; Turner, W. D.; Culp, C.; Haberl, J. S.; Bryant, J.; Baltazar-Cervantes, J. C.; Gilman, D.

2004-01-01T23:59:59.000Z

94

TOWARDS UNIFYING DATABASE SCHEDULING AND  

E-Print Network (OSTI)

1 TOWARDS UNIFYING DATABASE SCHEDULING AND CONCURRENCY CONTROL: A FRONTIER APPROACH Gregory Jones previous work in real-time database concurrency control indexconcur- rency control and scheduling has focused on combiningvariations of traditional concurrency control techniques with real-time scheduling

Rhode Island, University of

95

Optimal Power Schedule for Distributed MIMO Links  

E-Print Network (OSTI)

an integration of link scheduling and power control for MIMOmedium access control, space-time power scheduling. Fig. 1.

Rong, Yue; Hua, Yingbo

2008-01-01T23:59:59.000Z

96

ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: INFORMATIONAL SERVICES RECORDS ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS This schedule covers certain records pertaining to informational services...

97

DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act Investment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act Investment Saves Money, Trains Workers, Creates Jobs DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act Investment Saves Money, Trains Workers, Creates Jobs May 12, 2011 - 12:00pm Addthis Media Contact (202) 586-4940 WASHINGTON, D.C. - The U.S. Department of Energy announced today it has surpassed one of the Obama Administration's High Priority Performance Goals five months ahead of schedule in its effort to clean up the legacy of the Cold War. Through a $6 billion American Recovery and Reinvestment Act investment, the Department's cleanup footprint has been reduced by 45 percent, from 931 square miles to 516 square miles. By achieving this reduction, the Department is on track to reduce its overall cleanup footprint by

98

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Shutdown Planning Shutdown Planning Planning Templates Shutdown Planning Schedules: Current Shutdown Schedule Archives: 2006 - 2013 APS Long-Range Operations Schedule: 2014 Archives: 2013 | 2012 2011 | 2010 | 2009 | 2008 2007 | 2006 | 2005 | 2004 2003 | 2002 | 2001 | 2000 1999 | 1998 | 1997 | 1996 APS Long-Range Operations Schedule (Fiscal Year 2014) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2013-3 2014-1 2014-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2

99

Alternative Fuels Data Center: Emissions Reduction Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Emissions Reduction Emissions Reduction Requirements to someone by E-mail Share Alternative Fuels Data Center: Emissions Reduction Requirements on Facebook Tweet about Alternative Fuels Data Center: Emissions Reduction Requirements on Twitter Bookmark Alternative Fuels Data Center: Emissions Reduction Requirements on Google Bookmark Alternative Fuels Data Center: Emissions Reduction Requirements on Delicious Rank Alternative Fuels Data Center: Emissions Reduction Requirements on Digg Find More places to share Alternative Fuels Data Center: Emissions Reduction Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Emissions Reduction Requirements Recognizing the impact of carbon-emitting fuels on climate change and to

100

ADMINISTRATIVE RECORDS SCHEDULE 14:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS June 2007 Revision 1 This schedule covers certain records pertaining to informational services performed by the Department in their day-to-day affairs and in their relations with the public, including records created in administering Freedom of Information Act (FOIA) and Privacy Act ) programs. Except as otherwise specified in individual items, it applies to copies of these records wherever located. Item 4 applies only to files maintained in office responsible for the operation of the information activities. Items 11 through 15 describe the files accumulated in carrying out the provisions of the FOIA, and items 21 through 26 describe the files created in administering the provisions of the Privacy Act. Items 31

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Transportation Baseline Schedule  

SciTech Connect

The 1999 National Transportation Program - Transportation Baseline Report presents data that form a baseline to enable analysis and planning for future Department of Energy (DOE) Environmental Management (EM) waste/material transportation. The companion 1999 Transportation Barriers Analysis analyzes the data and identifies existing and potential problems that may prevent or delay transportation activities based on the data presented. The 1999 Transportation Baseline Schedule (this report) uses the same data to provide an overview of the transportation activities of DOE EM waste/materials. This report can be used to identify areas where stakeholder interface is needed, and to communicate to stakeholders the quantity/schedule of shipments going through their area. Potential bottlenecks in the transportation system can be identified; the number of packages needed, and the capacity needed at receiving facilities can be planned. This report offers a visualization of baseline DOE EM transportation activities for the 11 major sites and the Geologic Repository Disposal site (GRD).

Fawcett, Ricky Lee; John, Mark Earl

2000-01-01T23:59:59.000Z

102

BNL | ATF Beam Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Beam Schedule (pdf) Beam Schedule (pdf) Sunday Monday Tuesday Wednesday Thursday Friday Saturday 22 1/2 Holiday Holiday 28 January Holiday 4 5 Maintenance 11 12 Maintenance 18 19 Holiday AE52 - DWFA (Euclid), BL2 25 February AE52 - DWFA (Euclid), BL2 1 2 AE50 - PWFA in QNR (UCLA), BL2 8 9 AE50 - PWFA in QNR (UCLA), BL2 15 16 Holiday AE50 - PWFA in QNR (UCLA), BL2 22 March 1 2 AE53 - Nonlinear Compton (UCLA) 8 9 AE53 - Nonlinear Compton (UCLA) 15 16 AE53 - Nonlinear Compton (UCLA) 22 23 29 Sunday Monday Tuesday Wednesday Thursday Friday Saturday User operations (E-beam in use) Ions - Ion generation User operations (laser in use) PWFA - Plasma Wakefield Acceleration User operations (E-beam and laser in use)

103

Test Access Mechanism Optimization, Test Scheduling, and Tester Data Volume  

E-Print Network (OSTI)

Test Access Mechanism Optimization, Test Scheduling, and Tester Data Volume Reduction for System Marinissen, Senior Member, IEEE Abstract--We describe an integrated framework for system-on-chip (SOC) test automation. Our framework is based on a new test access mechanism (TAM) architecture consisting of flexible

Chakrabarty, Krishnendu

104

400A Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

APCF APCF Past APCF Memoranda APCF Past Construction Past APCF Construction Day Activity Impact Monday - 10.01.12 Excavation Small Concrete Small Site Utilities Small Tuesday - 10.02.12 Excavation Small Concrete Small Site Utilities Small Wednesday - 10.03.12 Excavation Small Concrete Small Site Utilities Moderate Thursday - 10.04.12 Excavation Small Concrete Small Site Utilities Moderate Friday - 10.05.12 Excavation Small Concrete Small Site Utilities Moderate Site Utility water line hot tap Moderate Saturday - 10.06.12 No work is scheduled for the weekends -/- Sunday - 10.07.12 No work is scheduled for the weekends -/- Monday - 10.08.12 Excavation Small Concrete Small Interior underground plumbing Small Site Utilities Moderate Site Utility water line hot tap Moderate

105

1993 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect

Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

US Bonneville Power Administration

1993-10-01T23:59:59.000Z

106

2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.  

SciTech Connect

This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

United States. Bonneville Power Administration.

2006-11-01T23:59:59.000Z

107

PART I - THE SCHEDULE  

Energy Savers (EERE)

or evaluation, assessing impacts and ecological risk, consulting with the U.S. Fish and Wildlife Service or National Marine Fisheries Service, and developing a management...

108

Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rate Schedules Rate Schedules Rate Schedules One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate levels and these studies for each of Southeastern's four power marketing systems are updated annually. They demonstrate the adequacy of the rates for each system. Rates are considered to be adequate when revenues are sufficient to repay all costs associated with power production and transmission costs, which include the amortization of the Federal investment allocated to power. Latest Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012

109

Demand Reduction  

Energy.gov (U.S. Department of Energy (DOE))

Grantees may use funds to coordinate with electricity supply companies and utilities to reduce energy demands on their power systems. These demand reduction programs are usually coordinated through...

110

Evaluation of Flood Runoff Reduction Effect of LID (Low Impact Development) based on the Decrease in CN: Case Studies from Gimcheon Pyeonghwa District, Korea  

Science Journals Connector (OSTI)

Abstract LID are spread on a small scale throughout target area, therefore, evaluation of their overall effect on flood reduction is not straightforward. As one solution dealing with this problem, Yoo et al. (2012) proposed a methodology for quantifying the flood runoff reduction effect of storage facilities by curve number (CN). Introduction of various infiltration or storage facilities causes the decrease in CN, which can be calculated using the runoff. The result derived was summarized in a graph showing the decrease in CN as an effect of the runoff reduction. That is, the runoff reduction effect of infiltration or storage facilities was able to be easily estimated using the derived graph. In this study, LID effects of Gimcheon Pyeonghwa district in Korea was quantified using this method. Additionally, the reduction amount of the runoff volume using the method suggested by Yoo et al. (2012) was compared with that estimated by using SWMM 5.0. As a result of this, the effect of LID facilities was shown similarly in both cases using the methodology used in this study and simulated using SWMM 5.0. This result verified that the methodology was valid even though it is straightforward and simple.

J. Sin; C. Jun; J.H. Zhu; C. Yoo

2014-01-01T23:59:59.000Z

111

Chemotherapy Operations Planning and Scheduling  

E-Print Network (OSTI)

Feb 12, 2010 ... ning and scheduling methods for chemotherapy patients with the ... growth, control or prevent the spread of cancer cells, and/or relieve cancer...

2010-02-13T23:59:59.000Z

112

Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Construction Schedule Current Projects 27-ID and 35-ID APS Vibration Reporting Protocol Summary of Construction Equipment Tests and Activities Jan 2014 Past Projects APCF LOM438...

113

Archives and History Office: Records Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Services > Records Schedules Services > Records Schedules Records Schedules Note: Some links on this page open pdf files, which require the free Acrobat Reader. SLAC Current Organizational Unit File Plans / Records Control Schedules For assistance in applying or developing a records schedule for your unit, please contact either the SLAC Archives and History Office (x3091 -- directorate and research records) or the SLAC Records Manager (x4342 -- business and safety records). Directorate Organizational Unit Applicable File Plans(s) / Records Control Schedule(s) Director's Office SLAC DO Schedule Advisor for Science and Technology DOE Administrative Records schedules and DOE R&D Schedule Chief Research Officer DOE Administrative Records schedules and DOE R&D Schedule Communications Office DOE Administrative Records schedules (particularly ADM14 and ADM21)

114

Scalable Scheduling of Building Control Systems for Peak Demand Reduction  

E-Print Network (OSTI)

Behl, Rahul Mangharam and George J. Pappas Department of Electrical and Systems Engineering University operation of sub- systems such as heating, ventilating, air conditioning and refrigeration (HVAC&R) systems is fundamental for their efficient behavior, especially in elec- trical systems and the electric grid [1]. Peak

Pappas, George J.

115

Minimizing fuel emissions by optimizing vessel schedules in liner shipping with uncertain port times  

Science Journals Connector (OSTI)

We consider the problem of designing an optimal vessel schedule in the liner shipping route to minimize the total expected fuel consumption (and emissions) considering uncertain port times and frequency requirements on the liner schedule. The general optimal scheduling problem is formulated and tackled by simulation-based stochastic approximation methods. For special cases subject to the constraint of 100% service level, we prove the convexity and continuous differentiability of the objective function. Structural properties of the optimal schedule under certain conditions are obtained with useful managerial insights regarding the impact of port uncertainties. Case studies are given to illustrate the results.

Xiangtong Qi; Dong-Ping Song

2012-01-01T23:59:59.000Z

116

DOERS Records Schedule Cross Index to DOE Administrative Records...  

Office of Environmental Management (EM)

DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules...

117

Notice of Cancellation of the Environmental Impact Statement for the Clean Power From Integrated Coal/Ore Reduction (CPICOR) Project (DOE/EIS-0280) (10/26/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Federal Register / Vol. 69, No. 206 / Tuesday, October 26, 2004 / Notices DEPARTMENT OF ENERGY Notice of Cancellation of Environmental Impact Statement for the McIntosh Unit 4 Pressurized Circulating Fluidized Bed Demonstration Project AGENCY: Department of Energy. ACTION: Notice of cancellation of Environmental Impact Statement Process. SUMMARY: The Department of Energy (DOE) is canceling the preparation of an Environmental Impact Statement (EIS) for a proposal by the City of Lakeland to design, construct, and operate a project known as the McIntosh Unit 4 Pressurized Circulating Fluidized Bed Demonstration Project in Lakeland, Florida. DOE selected the City of Lakeland's proposal for further consideration under DOE's Clean Coal Technology Demonstration Program

118

_PART I - THE SCHEDULE  

National Nuclear Security Administration (NNSA)

15 dated 9/9/13 Contract No. DE-AC04-94AL85000 15 dated 9/9/13 Contract No. DE-AC04-94AL85000 Modification No. M202 Part I - The Schedule Sections B through H TABLE OF CONTENTS B-1 SERVICES BEING ACQUIRED ...................................................................................... 4 B-2 CONTRACT TYPE AND VALUE (Rev. M218, M222, M236, M241, M261, M266, M288, M293, M312, M319, M344, M365, M400, M404, M443, M448, M473, M484, M0512, A0514) ............................................................................................................................ 4 B-3 AVAILABILITY OF APPROPRIATED FUNDS ................................................................. 8 B-9999 AMERICAN RECOVERY AND REINVESTMENT ACT WORK VALUES (Added M331; Modified: A335, A336, A340, A341, A342, A346, A347, A348, A349, A350,

119

Structure Breakdown Workshop Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Breakdown Breakdown Workshop SLAC, Orange Room August 28 - 30 , 2000 Announcement Workshop Poster Workshop Goals: The Goal of the workshop is to review understanding of warm structure breakdown phenomena, to define common terms for comparing tests and to identify avenues for further study. For a partial bibliography, please view the following URL : http://www-project.slac.stanford.edu/lc/wkshp/RFBreakdwn/references/publist.htm Schedule and Presentations: Monday, August 28 8:30 - Operation Experience and Definition of Problem Moderator - G. Loew (initial questions) Opening remarks and introduction (C. Adolphsen) (15min) CERN Structure Operation Results (W. Wuensch) (30 min) NLCTA Structure Operation Results (C. Adolphsen) (30 min) ASTA Structure Operation Results (R. Loewen) (20 min)

120

Speaker Host Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

User Science Seminar User Science Seminar Previous Speakers User Science Seminar Host Schedule User seminar is hosted by a different XSD group leader every two weeks. If you have any suggestions for possible speakers for the following dates, please contact the appropiate group leader below. Month Host 2012 October 5 & 12, 2012 Peter Chupas October 19 & 26,2012 Jon Almer November 2 & 9,2012 Francesco Decarlo November 16, 2012 Stefan Vogt November 23, 2012 Cancelled - Thanksgiving Holiday December 7, 2012 Stefan Vogt December 14 & 21, 2012 Randy Winans December 28, 2012 Cancelled - Xmas Holiday 2013 Janurary 4-25, 2013 Cancelled - January Shutdown February 1 & 8 , 2013 Lahsen Assoufid February 15 & 22, 2013 Thomas Gog March 1 & 8, 2013 Jonathan Lang

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

schedule_2006.xls  

NLE Websites -- All DOE Office Websites (Extended Search)

6 Long Range Operations Schedule 6 Long Range Operations Schedule (October 2005 - September 2006) 1 1 1 1 → 1 1 1 4 → 1 1 1 1 1 1 2 2 4 → 2 1 → 2 2 2 4 2 2 2 2 2 1 → 2 3 3 4 3 1 → 3 3 3 4 3 3 3 3 3 1 → 3 4 4 4 4 1 → 4 4 4 4 4 4 4 4 4 1 → 4 5 5 4 5 1 → 5 5 5 4 5 5 5 5 5 1 → 5 6 6 4 6 1 6 6 6 4 6 6 6 6 6 1 → 6 7 7 4 7 1 → 7 7 7 4 7 7 7 7 7 1 → 7 8 8 4 8 1 → 8 8 8 4 → 8 8 8 8 8 1 8 9 9 9 1 → 9 9 9 4 9 9 9 9 9 1 → 9 10 10 10 1 → 10 10 10 4 10 10 10 10 10 1 → 10 11 11 11 1 → 11 11 11 4 11 11 11 11 11 1 → 11 12 12 12 1 → 12 12 12 4 12 1 → 12 12 12 4 → 12 1 → 12 13 13 13 1 13 13 13 4 13 1 → 13 13 13 4 13 1 → 13 14 14 14 5 → 14 14 14 14 1 → 14 14 14 4 14 1 → 14 15 15 15 5 15 15 15 15 1 → 15 15 15 4 15 1 15 16 16 16 5 16 16 16 16 1

122

Wholesale Power Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Rate Schedules » Wholesale Power Rate Schedules Services » Rate Schedules » Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina October 1, 2012 Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina October 1, 2012 Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina October 1, 2012 MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association

123

Wholesale Power Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Rate Schedules » Wholesale Power Rate Schedules Services » Rate Schedules » Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina October 1, 2012 Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina October 1, 2012 Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina October 1, 2012 MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association

124

Scheduling algorithms for arbitrary communication networks  

E-Print Network (OSTI)

We consider the problem of designing scheduling schemes for networks with arbitrary topology and scheduling constraints. We address the optimality of scheduling schemes for packet networks in terms of throughput, delay and ...

Jagabathula, Srikanth

2008-01-01T23:59:59.000Z

125

Data Reduction  

Science Journals Connector (OSTI)

Data reduction has two meanings. Firstly, in analysis, it is the process of reducing large masses of data to produce afew summary statistics. This process involves grouping data into tables, visualizing the...

2008-01-01T23:59:59.000Z

126

Impact of Sr segregation on the electronic structure and oxygen reduction activity of SrTi[subscript 1?x]Fe[subscript x]O[subscript 3] surfaces  

E-Print Network (OSTI)

The correlation between the surface chemistry and electronic structure is studied for SrTi[subscript 1?x]Fe[subscript x]O[subscript 3] (STF), as a model perovskite system, to explain the impact of Sr segregation on the ...

Chen, Yan

127

ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: TRAVEL AND TRANSPORTATION RECORDS ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS This schedule covers records documenting the movement of goods and persons...

128

ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION...  

Energy Savers (EERE)

9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) This schedule covers records documenting the...

129

INSTRUCTIONS for COMPLETING SCHEDULE CARD WEB FORMS  

E-Print Network (OSTI)

Mar 22, 2012 ... Instructions for completing schedule card web forms. The following students are required to complete schedule card web forms. all returning...

Kelly Beranger

2012-03-22T23:59:59.000Z

130

ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS | Department...  

Office of Environmental Management (EM)

20: ELECTRONIC RECORDS ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS This schedule authorizes the disposition of specified electronic records and hard-copy or microform...

131

ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIOVISUAL RECORDS ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS This schedule covers audiovisual and related records created by or for Department and those acquired in...

132

ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIOVISUAL RECORDS (Revision 1) ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision 1) This schedule covers audiovisual and related records created by or for...

133

ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS | Department...  

Office of Environmental Management (EM)

0: ELECTRONIC RECORDS ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS This schedule authorizes the disposition of specified electronic records and hard-copy or microform...

134

LCLS Operating Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

LCLS Operating Schedule LCLS Operating Schedule August - December 2009 Ver: 2 10/30/09 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M 0000-0800 MD MD MD MD MD 0800-1600 ROD MD AMO ROD MD AMO 1600-2400 MD MD Commissioning MD MD Comm. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W 0000-0800 MD MD MD MD MD MD MD MD MD 0800-1600 MD ROD AMO MD ROD AMO MD ROD AMO MD ROD AMO ROD 1600-2400 MD MD Commissioning MD MD Commissioning MD MD Commissioning MD MD Commissioning MD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S 0000-0800 MD MD MD MD MD MD MD MD MD 0800-1600 Young MD ROD DiMauro MD ROD Berrah MD ROD Coffee MD ROD Young-II 1600-2400 L018 MD MD L026 MD MD L015 MD MD L027 MD MD L017 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Su

135

Wholesale Power Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Schedules Schedules Wholesale Power Rate Schedules October 1, 2011 CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU October 1, 2011 CSI-1-H Wholesale Power Rate Schedule Area: Southern Illinois System: CU October 1, 2011 CK-1-H Wholesale Power Rate Schedule Area: KU Area System: CU October 1, 2011 CEK-1-H Wholesale Power Rate Schedule Area: East Kentucky System: CU October 1, 2011 CC-1-I Wholesale Power Rate Schedule Area: CP&L Area, Western Division System: CU September 20, 2011 JW-1-J Wholesale Power Rate Schedule Area: Woodruff Preference Customer System: Jim Woodruff September 20, 2011 JW-2-F Wholesale Power Rate Schedule Area: Florida Power Corporation System: Jim Woodruff November 17, 2010 AP-1-B Wholesale Power Rate Schedule Area: American Electric Power

136

EIA Records Schedule 0011.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RECORD SCHEDULE N1-434-94-001 RECORD SCHEDULE N1-434-94-001 EIA Records Schedule N1-434-94-001 Approved by NARA April 3, 1995 (Some surveys are no longer in use. Read notes at bottom of last page) ITEM NO. DESCRIPTION OF RECORDS AUTHORIZED DISPOSITION Item 1) COAL DISTRIBUTION DATA, 1980-1988. This file contains data on the distribution of U.S. coal by coal-producing district of origin, consumer end-use category, state of destination and method of transportation; also included is export shipment information. This is a closed series. Disposition: PERMANENT. Transfer a copy of the data files and documentation to the National Archives upon approval of this schedule by the Archivist of the United States Item 2) HISTORICAL PLANT COST AND ANNUAL PRODUCTION EXPENSE DATA, 1979-1991.

137

On parallel machine scheduling 1  

E-Print Network (OSTI)

On parallel machine scheduling 1 machines with setup times. The setup has to be performed by a single server. The objective is to minimize even for the case of two identical parallel machines. This paper presents a pseudopolynomial

Magdeburg, Universität

138

Task merging for better scheduling  

Science Journals Connector (OSTI)

This paper proposes a new algorithm to restructure task graphs for suitable scheduling. The algorithm reduces communication costs by merging those tasks within a task graph whose communication costs exceeds their execution time. Task duplication techniques ...

Saeed Parsa; Neda Reza Soltani; Saeed Shariati

2009-08-01T23:59:59.000Z

139

PART I - THE SCHEDULE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

J-2 to DE-AM52-09NA28021 J-2 to DE-AM52-09NA28021 STATEMENT OF WORK FOR NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) SUPPORT SERVICES ACQUISITION PREPARATION AND REVIEW OF ENVIRONMENTAL IMPACT STATEMENTS, ENVIRONMENTAL ASSESSMENTS, ENVIRONMENTAL REPORTS, AND OTHER ENVIRONMENTAL DOCUMENTATION dated November 5, 2007 1.0 INTRODUCTION During the next five years, the U.S. Department of Energy's (DOE) Program and Field Offices nationwide, including the National Nuclear Security Agency (NNSA) and the Federal Energy Regulatory Commission (FERC) and their offices, will require Contractor support services for the preparation of environmental impact statements (EISs), environmental assessments (EAs) and related documents under the National Environmental Policy Act (NEPA);

140

Delay tails in MapReduce scheduling  

Science Journals Connector (OSTI)

MapReduce/Hadoop production clusters exhibit heavy-tailed characteristics for job processing times. These phenomena are resultant of the workload features and the adopted scheduling algorithms. Analytically understanding the delays under different schedulers ... Keywords: MapReduce, coupling scheduler, fair scheduler, first in first out, hadoop, heavy-tails, processor sharing

Jian Tan; Xiaoqiao Meng; Li Zhang

2012-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Provably Efficient Two-Level Adaptive Scheduling  

E-Print Network (OSTI)

processor reallocation, our schedulers provide control over the scheduling overhead and ensure effectiveProvably Efficient Two-Level Adaptive Scheduling Yuxiong He1 , Wen-Jing Hsu1 , and Charles E. Multiprocessor scheduling in a shared multiprogramming en- vironment can be structured in two levels, where

Feitelson, Dror

142

Wireless Link Scheduling under Physical Interference Model  

E-Print Network (OSTI)

approximation algorithms for link scheduling with or without power control. Index Terms--Link schedulingWireless Link Scheduling under Physical Interference Model Peng-Jun Wan, Ophir Frieder, Xiaohua Jia: jia@cs.cityu.edu.hk, csfyao@cityu.edu.hk Abstract--Link scheduling is a fundamental problem in multi

Jia, Xiaohua

143

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume II - Technical Report, Annual Report to the Texas Commission on Environmental Quality, January 2006 - June 2007  

E-Print Network (OSTI)

........................... 168 Figure 106: Base-case Lighting Profile for a large commercial building (Abushakra et al. 2001). .............................. 172 Figure 107: Cold Deck Temperature Schedule... ........................... 168 Figure 106: Base-case Lighting Profile for a large commercial building (Abushakra et al. 2001). .............................. 172 Figure 107: Cold Deck Temperature Schedule...

Degelman, L.; Mukhopadhyay, J.; McKelvey, K.; Montgomery, C.; Baltazar-Cervantes, J. C.; Liu, Z.; Ahmed, M.; Verdict, M.; Muns, S.; Fitzpatrick, T.; Gilman, D.; Yazdani, B.; Culp, C.; Haberl, J. S.

144

Bringing the User Back into Scheduling: Two Case Studies of Interaction with Intelligent Scheduling Assistants  

E-Print Network (OSTI)

of scheduling, or they demand too much control of an important aspect of the individual's working world. PTIMEBringing the User Back into Scheduling: Two Case Studies of Interaction with Intelligent Scheduling This position paper discusses the scheduling problem as collaboration between human and automated scheduling

Yorke-Smith, Neil

145

Nitrate reduction  

DOE Patents (OSTI)

Nitrates are reduced to nitrogen gas by contacting the nitrates with a metal to reduce the nitrates to nitrites which are then contacted with an amide to produce nitrogen and carbon dioxide or acid anions which can be released to the atmosphere. Minor amounts of metal catalysts can be useful in the reduction of the nitrates to nitrites. Metal salts which are formed can be treated electrochemically to recover the metals.

Dziewinski, Jacek J. (Los Alamos, NM); Marczak, Stanislaw (Los Alamos, NM)

2000-01-01T23:59:59.000Z

146

Assessing the impact of energy saving measures on the future energy demand and related GHG (greenhouse gas) emission reduction of Croatia  

Science Journals Connector (OSTI)

Abstract In the light of European energy-climate package and its measures for increasing security of supply, decreasing the impact on environment and stimulating sustainability, Croatia as a new EU (European Union) member state needs to reconsider and develop new energy policy towards energy efficiency and renewable energy sources. Croatian long-term energy demand and its effect on the future national GHG (greenhouse gas) emissions are analysed in this paper. For that purpose the NeD model was constructed (National energy demand model). The model is comprised out of six modules, each representing one sector: industry, transport, households, services, agriculture and construction. The model is based on bottom up approach. The analysis has shown that energy policy measures, identified through this paper, can potentially achieve energy savings up to 157PJ in the year 2050, which presents a 40% decrease to referent (frozen efficiency) scenario. Results obtained in this paper were also compared to the Croatian National Energy Strategy for the years 2020 and 2030. It was shown that if already implemented policies were properly taken into account the actual final energy demand for the year 2030 would be 43% lower than projected by the Croatian National Energy Strategy.

Tomislav Pukec; Brian Vad Mathiesen; Tomislav Novosel; Neven Dui?

2014-01-01T23:59:59.000Z

147

1996 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect

Bonneville Power Administration`s (BPA) 1996 Wholesale Power Rate Schedules, 1996 Ancillary Products and Services Rate Schedule, 1996 Transmission Rate Schedules, and General Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1996. These rate schedules and provisions were approved by the Federal Energy Regulatory Commission (FERC), United States Department of Energy, in September 1996 (Docket Nos EF96-2011-000 and EF96f-2021-000). These rate schedules and General Rate Schedule Provisions were approved on a final basis by the FERC July 30, 1997, in Dept. of Energy--Bonneville Power Administration, Docket Nos. EF96-2011-000 and EF96-2021-000. Except as noted elsewhere, these 1996 rate schedules and provisions supersede BPA`s Wholesale Power Rate Schedules and General Rate Schedule Provisions, and Transmission Rate Schedules and General Transmission Rate Schedule Provisions, effective October 1, 1995. These rate schedules and general rate schedule provisions include all errata.

United States. Bonneville Power Administration.

1996-10-01T23:59:59.000Z

148

Argonne National Lab Cleanup schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Takes Steps to Complete Clean-Up of Argonne by 2003; Takes Steps to Complete Clean-Up of Argonne by 2003; Schedule for Shipping Waste to WIPP is 'Good News' for Illinois CARLSBAD, N.M., May 15, 2000 - The U.S. Department of Energy (DOE) reinforced plans to complete the clean-up of its Argonne National Laboratory-East site in Illinois by 2003 by accelerating its schedule for shipping transuranic waste to DOE's permanent disposal site in New Mexico. Previously, the shipments were not expected to begin before 2003. Under the accelerated schedule, shipments to DOE's Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, are expected to begin in Spring 2001 and be completed by the end of the calendar year. Characterization of the waste currently stored at Argonne will begin this October. This agreement is a major step in honoring Argonne and DOE's commitment to the community to

149

NSLS-II Project Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

NSLS-II Project Schedule NSLS-II Project Schedule Major Milestone Event Major Milestone Event Preliminary Schedule CD-0 (approve Mission Need) 4th quarter, FY2005 CD-1 (approve Alternative Selection and Cost Range) 4th quarter, FY2007 CD-2 (approve Performance Baseline) 1st quarter, FY2008 CD-3 (approve Start of Construction) 2nd quarter, FY2009 CD-4 (approve Start of Operations) FY2015 Critical Decisions The five Critical Decisions are major milestones approved by the Secretarial Acquisition Executive or Acquisition Executive that establish the mission need, recommended alternative, Acquisition Strategy, the Performance Baseline, and other essential elements required to ensure that the project meets applicable mission, design, security, and safety requirements. Each Critical Decision marks an increase in commitment of

150

Technical Qualification Program Accreditation Schedule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Qualification Program (TQP) Accreditation Schedule Qualification Program (TQP) Accreditation Schedule (Note 1) Year 2013 2014 Month Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec P Site/Office EM Sites/Offices Y Carlsbad Field Office ? Consolidated Business Center Y Office of River Protection (Note 3) ? Office of Site Support and Small Projects N Portsmouth/Paducah Project Office Y Richland Operations Office (Note 3) Y Savannah River Operations Office N Office of Environmental Management SC Sites/Offices

151

Multi-agent Cluster Scheduling for Scalability and Flexibility  

E-Print Network (OSTI)

of clusters scheduling and classical concurrency controlotherwise push control of task scheduling and execution towhich actively controls and modifies scheduling domains as

Konwinski, Andrew David

2012-01-01T23:59:59.000Z

152

Adaptive Scheduling in Ad Hoc and Cellular Wireless Networks  

E-Print Network (OSTI)

2004. 3 Joint Scheduling and Power Control for Multicastingusers. This joint scheduling and power control problem is38 Joint Scheduling and Power Control for Multicasting in

Tan, Choo Chin

2013-01-01T23:59:59.000Z

153

A Hybrid Bin-Packing Heuristic to Multiprocessor Scheduling  

E-Print Network (OSTI)

Abstract. The multiprocessor scheduling problem consists in schedul- ...... parallel machine scheduling", Production Planning and Control 9 (1998), 685{689. 9.

154

Pump-1-A Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-A Wholesale Power Rate Schedule Pump-1-A Wholesale Power Rate Schedule Area: Carters & Russell Pumping System: Georgia-Alabama-South Carolina This rate schedule shall be...

155

Audit/Investigative Records Schedule (Revision 2) | Department...  

Office of Environmental Management (EM)

Investigative Records Schedule (Revision 2) AuditInvestigative Records Schedule (Revision 2) This schedule covers records associated with investigations other than those performed...

156

DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS | Department of...  

Office of Environmental Management (EM)

DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS This schedule provides for the disposition of U.S. Department of Energy (DOE) records...

157

ENVIRONMENTAL ASSESSMENT INITIAL REGULATORY IMPACT REVIEW  

E-Print Network (OSTI)

FINAL ENVIRONMENTAL ASSESSMENT AND INITIAL REGULATORY IMPACT REVIEW FOR PACIFIC COAST SALMON PLAN AND ACCOUNTABILITY MEASURES, AND DE MINIMIS FISHING PROVISIONS REGULATORY IDENTIFIER NUMBER 0648-BA55 PREPARED........................................................................................................1 1.3 Plan Development Schedule and Council Advisory Committee Participation

158

SCHEDULE OF FEES Wet Milling  

E-Print Network (OSTI)

SCHEDULE OF FEES Wet Milling 100 g.......................$120..per sample* 1 kilogram of Illinois offers five milling procedures to determine processing characteristics of corn. Laboratory times. WET MILLING The wet milling process is used to produce starch (99.6% purity) as the primary

Illinois at Urbana-Champaign, University of

159

Optimization of Injection Scheduling in  

E-Print Network (OSTI)

SGP-TR-I12 Optimization of Injection Scheduling in Geothermal Fields James Lovekin May 1987&injection optimization problem is broke$ into two subpmbkm:(1) choosing a configuration of injectorsfrom an existing set is defined as the fieldwide break- through lindex, B. Injection is optimized by choosing injection wells

Stanford University

160

Scheduling & Resources - Power Marketing - Sierra Nevada Region...  

NLE Websites -- All DOE Office Websites (Extended Search)

Marketing > Scheduling & Resources Scheduling & Resources - Greenbook 2004 (PDF - 1.04MB) - CVP Gross Power (XLS - 5.25MB) - CVP BaseResource (XLS - 2.02MB) - WY2002 Analysis (XLS...

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Human aspects of scheduling : a case study  

E-Print Network (OSTI)

This work presents a look at real-life production-floor scheduling, comparing and contrasting it to both normative OR theory and Cognitive Psychology theory. Relevant literature in OR, scheduling and psychology is reviewed, ...

Boasson, Yishai, 1973-

2006-01-01T23:59:59.000Z

162

Medical Exam Scheduling - HPMC Occupational Health Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis Human Reliability Program (HRP) Industrial Rehabilitation & Ergonomics Infection Control & Immunizations Influenza Immunization Program Medical Exam Scheduling Medical...

163

Multi-Year Schedule | Department of Energy  

Energy Savers (EERE)

DOE's currently scheduled rulemaking activities for energy conservation standards and test procedures. multiyearscheduleaug2011.pdf More Documents & Publications 9th...

164

ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC...  

Office of Environmental Management (EM)

CARTOGRAPHIC, AERIAL PHOTOGRAPHIC, ARCHITECTURAL, ENGINEERING, AND FACILITY MANAGEMENT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC, ARCHITECTURAL,...

165

ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS Budget and...

166

ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT Budget and apportionment records...

167

Move Frame Scheduling and Mixed SchedulingAllocation for the Automated Synthesis of Digital Systems y  

E-Print Network (OSTI)

steps: 1) Data path synthe­ sis (operation scheduling and hardware allocation), and 2) Control path design. In the scheduling phase, operations are assigned to the appropriate control steps. The allocaMove Frame Scheduling and Mixed Scheduling­Allocation for the Automated Synthesis of Digital

Nourani, Mehrdad

168

DYNAMIC SCHEDULING M. C. H. Wright  

E-Print Network (OSTI)

for a time interval after which control is returned to the scheduling program to determine the best project who wants more time to evaluate their data can return control to the scheduling program, and come backDYNAMIC SCHEDULING M. C. H. Wright Radio Astronomy Laboratory, University of California, Berkeley

Militzer, Burkhard

169

CPU Inheritance Scheduling Bryan Ford Sai Susarla  

E-Print Network (OSTI)

, providing much greater scheduling flexibil­ ity. Modular, hierarchical control can be provided over systems control the sharing of the machine's CPU resources among threads using a fixed scheduling schemeCPU Inheritance Scheduling Bryan Ford Sai Susarla Department of Computer Science University of Utah

Ford, Bryan

170

CPU Inheritance Scheduling Bryan Ford Sai Susarla  

E-Print Network (OSTI)

, providing much greater scheduling flexibil- ity. Modular, hierarchical control can be provided overCPU Inheritance Scheduling Bryan Ford Sai Susarla Department of Computer Science University of Utah processor scheduling mechanisms in operat- ing systems are fairly rigid, often supportingonly one fixed

Ford, Bryan

171

Models for Train Scheduling Krishna C. Jha  

E-Print Network (OSTI)

Models for Train Scheduling Krishna C. Jha Vice President - Research & Development krishna/analytics, and packaging into web-based map-based interfaces. Innovative Scheduling Overview #12;-3- The train schedule is one of most critical components in the passenger or freight transportations. The quality of a train

Bustamante, Fabián E.

172

Batch Scheduling with Deadlines on Parallel Machines  

E-Print Network (OSTI)

Batch Scheduling with Deadlines on Parallel Machines Peter Brucker Mikhail Y. Kovalyov, Yakov M of scheduling G groups of jobs on m parallel machines is considered. Each group consists of several identical) and to schedule the batches on the machines. It is possible for different batches of the same group

Magdeburg, Universität

173

Next Generation CANDU: Conceptual Design for a Short Construction Schedule  

SciTech Connect

Atomic Energy of Canada Ltd. (AECL) has very successful experience in implementing new construction methods at the Qinshan (Phase III) twin unit CANDU 6 plant in China. This paper examines the construction method that must be implemented during the conceptual design phase of a project if short construction schedules are to be met. A project schedule of 48 months has been developed for the nth unit of NG (Next Generation) CANDU with a 42 month construction period from 1. Concrete to In-Service. An overall construction strategy has been developed involving paralleling project activities that are normally conducted in series. Many parts of the plant will be fabricated as modules and be installed using heavy lift cranes. The Reactor Building (RB), being on the critical path, has been the focus of considerable assessment, looking at alternative ways of applying the construction strategy to this building. A construction method has been chosen which will result in excess of 80% of internal work being completed as modules or as very streamlined traditional construction. This method is being further evaluated as the detailed layout proceeds. Other areas of the plant have been integrated into the schedule and new construction methods are being applied to these so that further modularization and even greater paralleling of activities will be achieved. It is concluded that the optimized construction method is a requirement, which must be implemented through all phases of design to make a 42 month construction schedule a reality. If the construction methods are appropriately chosen, the schedule reductions achieved will make nuclear more competitive. (authors)

Hopwood, Jerry M.; Love, Ian J.W.; Elgohary, Medhat; Fairclough, Neville [Atomic Energy of Canada Ltd., Ontario (Canada)

2002-07-01T23:59:59.000Z

174

Flow shop scheduling with peak power consumption constraints  

E-Print Network (OSTI)

Mar 29, 2012 ... Flow shop scheduling with peak power consumption constraints ... Keywords: scheduling, flow shop, energy, peak power consumption, integer...

K. Fang

2012-03-29T23:59:59.000Z

175

Weekly Petroleum Status Report Schedule  

Gasoline and Diesel Fuel Update (EIA)

Weekly Petroleum Status Report Weekly Petroleum Status Report Release Schedule The wpsrsummary.pdf, overview.pdf, and Tables 1-14 in CSV and XLS formats, are released to the Web site after 10:30 a.m. (Eastern Time) on Wednesday. All other PDF and HTML files are released to the Web site after 1:00 p.m. (Eastern Time) on Wednesday. Appendix D is produced during the winter heating season, which extends from October through March of each year. For some weeks which include holidays, releases are delayed by one day. Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Wednesdays with the following exceptions. All times are Eastern. Data for the week ending Alternate Release Date Release Day Release Time Holiday October 11, 2013 October 21, 2013 Monday 10:30 a.m. Columbus/EIA Closed

176

Microsoft Word - Changes-to-Schedules _Recovered_  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Changes-to-Schedules Changes-to-Schedules REV 5 DOE Administrative Records Schedules Changes Last revised: 12/10/2010 Date DOE Admin Schedule Item(s) Change Authorizing Document 9/15/10 - 12/10/2010 1-6, 9, 11-12, 14, 16-18, 22- 23 Various Removal of items at the end of each schedule for e-mail and word processing copies, which were added to the GRS in Transmittal Number 8. For schedules in which this item is located elsewhere and removal would cause changes in the sequence of item numbers, the item was changed to "Reserved" (Schedules ,4,5, and 14.) GRS Transmittal Number 22 9/15/2010 1 23.b.(3) Deleted citation, 5 CFR 214. GRS Transmittal Number 22 1 25.a. Text deleted "and as described in 29 CFR 1614." GRS Transmittal Number 22

177

This Week In Petroleum Schedule  

U.S. Energy Information Administration (EIA) Indexed Site

This Week In Petroleum Schedule This Week In Petroleum Schedule Holiday Release Schedule for the This Week In Petroleum The standard release time and day of the week will be after 1:00 p. m. (Eastern time) on Wednesdays with the following exceptions. Data for the week ending Alternate Release Date Release Day Release Time Holiday November 8, 2013 November 14, 2013 Thursday after 1:00 p.m. Veterans December 20, 2013 December 27, 2013 Friday after 1:00 p.m. Christmas December 27, 2013 January 3, 2014 Friday after 1:00 p.m. New Year's January 17, 2014 January 23, 2014 Thursday after 1:00 p.m. Martin Luther King Jr. February 14, 2014 February 20, 2014 Thursday after 1:00 p.m. President's May 23, 2014 May 29, 2014 Thursday after 1:00 p.m. Memorial August 29, 2014 September 4, 2014 Thursday after 1:00 p.m. Labor

178

1998 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Tue, Nov 11, 17:00 Wed, Nov 12, '97 17:00 Mon, Nov 17, '97 18:00-Wed, Nov 19, '97 02:00 32 hrs Mon, Dec 01, '97 17:00 Tue, Dec 02, '97 13:00 Mon, Dec 08, '97 06:00-Wed, Dec 10, '97 02:00 44 hrs Mon, Jan 05, 17:00 Tue, Jan 06, 13:00 Mon, Jan 12, 18:00-Wed, Jan 14, 02:00 32 hrs Fri, Jan 16, 17:00 Tue, Jan 20, 13:00 Mon, Jan 26, 06:00-Wed, Jan 28, 02:00 44 hrs Mon, Feb 02, 17:00 Tue, Feb 03, 13:00 Tue, Feb 10, 18:00-Thu, Feb 12, 02:00 32 hrs Tue, Feb 17, 17:00 Wed, Feb 18, 17:00 Mon, Feb 23, 06:00-Wed, Feb 25, 02:00 44 hrs Mon, Mar 02, 17:00 Tue, Mar 03, 13:00 Mon, Mar 09, 18:00-Wed, Mar 11, 02:00 32 hrs Mon, Mar 16, 17:00 Tue, Mar 17, 13:00 Mon, Mar 23, 06:00-Wed, Mar 25, 02:00 44 hrs

179

1997 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 11, '96 17:00 Tue, Nov 12, '96 13:00 Tue, Nov 19, '96 15:00-Wed, Nov 20, '96 02:00 11 hrs Mon, Dec 02, '96 17:00 Tue, Dec 03, '96 13:00 Mon, Dec 09, '96 06:00-Wed, Dec 11, '96 02:00 44 hrs Mon, Jan 06, 17:00 Tue, Jan 07, 13:00 Mon, Jan 13, 18:00-Wed, Jan 15, 02:00 32 hrs Mon, Jan 20, 17:00 Tue, Jan 21, 13:00 Mon, Jan 27, 06:00-Wed, Jan 29, 02:00 44 hrs Mon, Feb 03, 17:00 Tue, Feb 04, 13:00 Tue, Feb 11, 18:00-Thu, Feb 13, 02:00 32 hrs Mon, Feb 18, 09:30 Tue, Feb 18, 13:00 Mon, Feb 24, 06:00-Wed, Feb 26, 02:00 44 hrs Mon, Mar 03, 17:00 Tue, Mar 04, 13:00 Mon, Mar 10, 18:00-Wed, Mar 12, 02:00 32 hrs Mon, Mar 17, 17:00 Tue, Mar 18, 13:00 Mon, Mar 24, 06:00-Wed, Mar 26, 02:00 44 hrs

180

2000 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 08, '99 17:00 Tue, Nov 09, '99 13:00 Mon, Nov 15, '99 18:00-Wed, Nov 17, '99 02:00 32 hrs Mon, Nov 29, '99 17:00 Tue, Nov 30, '99 13:00 Mon, Dec 06, '99 06:00-Wed, Dec 08, '99 02:00 44 hrs Mon, Jan 03, 17:00 Tue, Jan 04, 13:00 Mon, Jan 10, 18:00-Wed, Jan 12, 02:00 32 hrs Fri, Jan 14, 17:00 Tue, Jan 18, 13:00 Mon, Jan 24, 06:00-Wed, Jan 26, 02:00 44 hrs Mon, Feb 14, 17:00 Tue, Feb 15, 17:00 Tue, Feb 22, 06:00-Thu, Feb 24, 02:00 44 hrs Mon, Feb 28, 17:00 Tue, Feb 29, 13:00 Mon, Mar 06, 18:00-Wed, Mar 08, 02:00 32 hrs Mon, Mar 13, 17:00 Tue, Mar 14, 13:00 Mon, Mar 20, 06:00-Wed, Mar 22, 02:00 44 hrs Mon, Apr 10, 17:00 Tue, Apr 11, 13:00 Mon, Apr 17, 06:00-Wed, Apr 19, 02:00 44 hrs

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

2002 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 05, '01 17:00 Tue, Nov 06, '01 13:00 Mon, Nov 12, '01 18:00-Wed, Nov 14, '01 02:00 32 hrs Mon, Dec 03, '01 17:00 Tue, Dec 04, '01 13:00 Mon, Dec 10, '01 06:00-Wed, Dec 12, '01 02:00 44 hrs Mon, Dec 17, '01 09:00 Tue, Dec 18, '01 13:00 Mon, Jan 07, 18:00-Wed, Jan 9, 02:00 32 hrs Mon, Jan 14, 12:00 Tue, Jan 15, 13:00 Tue, Jan 22, 06:00-Thu, Jan 24, 02:00 44 hrs Mon, Jan 28, 17:00 Tue, Jan 29, 17:00 Tue, Feb 05, 18:00-Thu, Feb 07, 02:00 32 hrs Mon, Feb 11, 17:00 Tue, Feb 12, 17:00 Tue, Feb 19, 06:00-Wed, Feb 20, 02:00 20 hrs Mon, Feb 25, 17:00 Tue, Feb 26, 13:00 Mon, Mar 04, 18:00-Wed, Mar 06, 02:00 32 hrs Mon, Mar 11, 17:00 Tue, Mar 12, 13:00 Mon, Mar 18, 06:00-Wed, Mar 20, 02:00 44 hrs

182

1999 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

9 SSRL Accelerator Physics Schedule 9 SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 30, '98 17:00 Tue, Dec 01, '98 13:00 Mon, Dec 07, '98 06:00-Wed, Dec 09, '98 02:00 44 hrs Mon, Jan 04, 17:00 Tue, Jan 05, 13:00 Mon, Jan 11, 18:00-Wed, Jan 13, 02:00 32 hrs Fri, Jan 15, 17:00 Tue, Jan 19, 13:00 Mon, Jan 25, 06:00-Wed, Jan 27, 02:00 44 hrs Mon, Feb 01, 17:00 Tue, Feb 02, 13:00 Tue, Feb 09, 18:00-Thu, Feb 11, 02:00 32 hrs Tue, Feb 16, 17:00 Wed, Feb 17, 17:00 Mon, Feb 22, 06:00-Wed, Feb 24, 02:00 44 hrs Mon, Mar 01, 17:00 Tue, Mar 02, 13:00 Mon, Mar 08, 18:00-Wed, Mar 10, 02:00 32 hrs Mon, Mar 15, 17:00 Tue, Mar 16, 13:00 Mon, Mar 22, 06:00-Wed, Mar 24, 02:00 44 hrs Mon, Apr 12, 17:00 Tue, Apr 13, 13:00 Mon, Apr 19, 06:00-Wed, Apr 21, 02:00 44 hrs

183

Measuring the Impacts of Speed Reduction Technologies  

E-Print Network (OSTI)

-Seoud, Edward Anderson #12;Background Identified as a problem area Sharp curve & excessive speed High crash;Comparison of Mean Zones - Southbound, Commercial Vehicles 45 46 47 48 49 50 51 52 53 54 55 -1300 -1100 -900-70 Speed Category Before After #12;At nearest rest area

Bertini, Robert L.

184

Harboring Pollution: Air Quality Impacts of Marine Ports | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Harboring Pollution: Air Quality Impacts of Marine Ports Harboring Pollution: Air Quality Impacts of Marine Ports 2004 Diesel Engine Emissions Reduction (DEER) Conference...

185

Plans and Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appliance & Equipment Standards » About » Plans and Schedules Appliance & Equipment Standards » About » Plans and Schedules Plans and Schedules The Appliances and Equipment Standards program maintains a multi-year rulemaking schedule. The currently scheduled rulemaking activities are described in the program's semi-annual implementation report to Congress. The program will also issue other plans and schedules when needed. The most recent 5-year plan was released in October 2010 and outlines how the program planned to meet all the statutory requirements established in the Energy Policy and Conservation Act of 1975, as amended. Expedited Rulemakings In November 2010, the Department of Energy (DOE) adopted new procedures that enable certain rulemakings to be expedited or improve the efficiency of the rulemaking process:

186

Definition: Net Interchange Schedule | Open Energy Information  

Open Energy Info (EERE)

Interchange Schedule Interchange Schedule Jump to: navigation, search Dictionary.png Net Interchange Schedule The algebraic sum of all Interchange Schedules with each Adjacent Balancing Authority.[1] Related Terms Balancing Authority, Adjacent Balancing Authority, Interchange, Interchange Schedule, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Net_Interchange_Schedule&oldid=502531" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

187

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

2) 2) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2011-3 2012-1 2012-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

188

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

1) 1) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2010-3 2011-1 2011-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

189

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

3) 3) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2012-3 2013-1 2013-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

190

400A Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

27-ID and 35-ID 27-ID and 35-ID Past 27-ID and 35-ID Long Range Schedule (pdf) 27-ID and 35-ID Past Construction Past 27-ID and 35-ID Construction Day Activity Impact Week of 06.11.13 35-ID-D panels arrive, 35-ID-C panel installation complete. Start installation of 35-ID-D. -/- Week of 06.13.13 DCS/RIXS Construction Progress Meeting, LOM 438-C010, 9AM -/- Week of 06.18.13 27-ID-A panels arrive -/- Week of 06.25.13 first shipment of 35-ID-E panels arrives -/- Week of 06.03.13 continue installation of 35-ID-C panels, doors, roof and floor trim Low Week of 05.20.13 35-ID-C panels arrive begin installation of 35-ID-C wall and roof panels Low Week of 05.13.13 completion of 35-ID-B roof panels, installation of lead trim, steel capping and door installation. Low Tuesday - 03.05.13

191

Scheduling of a parallel workload: Implementation and use of the argonne easy scheduler at PDC  

Science Journals Connector (OSTI)

Scheduling of a workload of parallel jobs on a large parallel computer puts specific demands on a scheduling system. Especially if the objective is to give a good service for the largest parallel jobs. In this pa...

Lars Malinowsky; Per ster

1998-01-01T23:59:59.000Z

192

Robustness in Combinatorial Optimization and Scheduling Theory ...  

E-Print Network (OSTI)

ten years in the area of combinatorial optimization and scheduling theory .... with robust reformulation of optimization model by adapting robust control...

2006-09-26T23:59:59.000Z

193

Scheduling with Fixed Maintenance, Shared Resources and ...  

E-Print Network (OSTI)

Nov 17, 2014 ... The resulting problem is a non-linear scheduling problem with .... Once the grade control plan is constructed we need to solve the utilization...

2014-11-24T23:59:59.000Z

194

EM Quality Assurance Assessment Schedule FY 2010  

Energy.gov (U.S. Department of Energy (DOE))

Attached for planning and coordination purposes is the updated Quality Assurance(QA) assessment schedule for the remainder of fiscal year (FY) 2010.

195

Rate Schedule PACI-T3  

NLE Websites -- All DOE Office Websites (Extended Search)

receipt, adjusted for losses, and delivered to points of delivery. This service includes scheduling and system control and dispatch service needed to support the transmission...

196

Proposal Submittal and Scheduling Procedures Entry Page  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Submittal and Scheduling Procedures for Research at SSRL X-rayVUV Macromolecular Crystallography SSRL is funded by the Department of Energy, Office of Basic Energy...

197

Machine scheduling using the Bees algorithm.  

E-Print Network (OSTI)

??Single-machine scheduling is the process of assigning a group of jobs to a machine. The jobs are arranged so that a performance measure, such as (more)

Phrueksanant, Janyarat

2013-01-01T23:59:59.000Z

198

Construction project scheduling problem with uncertain resource ...  

E-Print Network (OSTI)

... on-going activities. 7 Conclusions and future work .... constrained construction scheduling, Journal of Computing in Civil Engineering, 13(3),. 207-216. [23] Liu...

2004-06-01T23:59:59.000Z

199

Work Schedules | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

job performance, improve morale and help reduce work-related stress, as well as reduce air pollution and traffic congestion. Participation in either the alternate work schedule...

200

ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: PROPERTY DISPOSAL RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS (Revision 2) These records pertain to the sales by agencies of real and...

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

activities. Many of these records have continuing historical value after they are no longer of use to the Department. This records schedule covers only disposable records...

202

Renewable Fuel Standard Schedule | Open Energy Information  

Open Energy Info (EERE)

Standard Schedule Standard Schedule Jump to: navigation, search Name Renewable Fuel Standard Schedule Sector Liquid Transportation Fuels Spatial Resolution National Geographic Scope United States Temporal Resolution Annual The United States Environmental Protection Agency, under the National Renewable Fuel Standard program and as required by the Energy Independence and Security Act of 2007 (EISA), periodically revises the volumetric standards for cellulosic biofuel, biomass-based diesel, advanced biofuel, and total renewable fuel that must be used in transportation fuel each year. The table below lists the current RFS2 schedule in billions of gallons: Year Renewable Biofuel Advanced Biofuel Cellulosic Biofuel Biomass-based Diesel Undifferentiated Total 2008 9 9

203

Optimal Scheduling and Control of a Multi-Pump Boosting System Zhenyu Yang and Hakon Brsting  

E-Print Network (OSTI)

a significant impact on the energy consumption of entire pump associated systems. For instance, the energy Abstract-- An optimal scheduling and control method for a multiple pump system is proposed from the energy, refrigeration, sewage treatment, oil and gas pipeline transportation, marine relevant services etc.. Today over

Yang, Zhenyu

204

Stork data scheduler: mitigating the data bottleneck in e-Science  

Science Journals Connector (OSTI)

...research-article Articles 1003 193 Theme Issue 'e-Science: novel research, new science and enduring impact' compiled and edited by David...scheduler: mitigating the data bottleneck in e-Science Tevfik Kosar 1 3 * Mehmet Balman 2 Esma Yildirim...

2011-01-01T23:59:59.000Z

205

APS Long Range Schedule 2000  

NLE Websites -- All DOE Office Websites (Extended Search)

APS FY2000 Beamline Operations Schedule APS FY2000 Beamline Operations Schedule JAN Monday Tuesday Wednesday Thursday Friday Saturday Sunday Week 1 10 11 12 13 14 15 16 0000-0800 SM SM SM SM SM MS MS 0800 - 1600 SM SM SM SM MS MS MS 1600 - 2400 SM SM SM SM MS MS MS Week 2 17 18 19 20 21 22 23 0000 - 0800 MS MS MS UO UO UO UO 0800 - 1600 MS MS UO UO UO UO UO 1600 - 2400 MS MS UO UO UO UO UO Week 3 24 25 26 27 28 29 30 0000 - 0800 UO UO UO UO UO UO UO 0800 - 1600 UO MS UO UO UO UO UO 1600 - 2400 UO UO UO UO UO UO UO JAN/FEB 31 1 2 3 4 5 6 0000 - 0800 UO MS MS UO UO UO UO 0800 - 1600 MS MS UO UO UO UO UO 1600 - 2400 MS MS UO UO UO UO UO Week 5 7 8 9 10 11 12 13 0000 - 0800 UO UO UO UO UO UO UO

206

Environmental surveillance master sampling schedule  

SciTech Connect

This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

Bisping, L.E.

1994-02-01T23:59:59.000Z

207

Schedule optimization study implementation plan  

SciTech Connect

This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

Not Available

1993-11-01T23:59:59.000Z

208

Genetic-based scheduling to solve the parcel hub scheduling problem  

Science Journals Connector (OSTI)

The parcel hub scheduling problem (PHSP) is scheduling problem that is common in the parcel delivery industry. The PHSP consists of scheduling a set of inbound trailers containing a batch of heterogeneous parcels to a set of unload docks with the objective ... Keywords: Distribution, Genetic algorithm, Parcel, Sortation, Work load balancing

Douglas L. McWilliams

2009-05-01T23:59:59.000Z

209

An Optimal General Purpose Scheduler for Networked Control Systems  

E-Print Network (OSTI)

An Optimal General Purpose Scheduler for Networked Control Systems Ahmed Elmahdi , Ahmad F Taha to control the time delay is to im- prove the scheduling criterion. This paper proposes an optimal scheduling the stability of the control system. The proposed optimal schedul- ing protocol is a hybrid scheduling criterion

Sun, Dengfeng

210

An assessment of the potential environmental impact of electric and hybrid-electric vehicles in Texas  

E-Print Network (OSTI)

of Automobile Emissions. . . . . . . . Emission Control Technologies IMPACT STUDY DESCRIPTION Impact Study Methodology Scope of Study RESULTS AND DISCUSSION Baseline Scenario (Tier I) Emissions . CAL-ZEV Program Scenario . CAL-LEV Program Scenario. NLEV... . . . Implementation Schedule for CAL-LEV Program. . . . . Implementation Schedule for Massachusetts and New York. . . Implementation Schedule for Connecticut Emission Benefits from NLEV Program. . Results of the NLEV Program for Dallas and Houston . . . Power...

Kim, Jung-Woo

2012-06-07T23:59:59.000Z

211

Design of State-based Schedulers for a Network of Control Loops  

E-Print Network (OSTI)

For a closed-loop system, which has a contention-based multiple access network on its sensor link, the Medium Access Controller (MAC) may discard some packets when the traffic on the link is high. We use a local state-based scheduler to select a few critical data packets to send to the MAC. In this paper, we analyze the impact of such a scheduler on the closed-loop system in the presence of traffic, and show that there is a dual effect with state-based scheduling. In general, this makes the optimal scheduler and controller hard to find. However, by removing past controls from the scheduling criterion, we find that certainty equivalence holds. This condition is related to the classical result of Bar-Shalom and Tse, and it leads to the design of a scheduler with a certainty equivalent controller. This design, however, does not result in an equivalent system to the original problem, in the sense of Witsenhausen. Computing the estimate is difficult, but can be simplified by introducing a symmetry constraint on th...

Ramesh, Chithrupa; Johansson, Karl H

2012-01-01T23:59:59.000Z

212

Retail Store Scheduling for Profit Nicolas Chapadosa  

E-Print Network (OSTI)

Retail Store Scheduling for Profit Nicolas Chapadosa , Marc Joliveaub , Pierre L'Ecuyera , Louis for retail stores has received relatively scant attention. Current approaches typically attempt to minimize the retail scheduling problem in terms of operating profit maximization, explicitly recognizing the dual role

L'Ecuyer, Pierre

213

Online Deadline Scheduling with Bounded Energy Efficiency  

E-Print Network (OSTI)

Online Deadline Scheduling with Bounded Energy Efficiency Joseph Wun-Tat Chan1 , Tak-Wah Lam 2 concern when compared to throughput and the schedules targeted may be very poor in energy efficiency subject to a user-defined threshold of energy efficiency. We first show that all deterministic online

Wong, Prudence W.H.

214

PROJECT SCHEDULING: IMPROVED APPROACH TO INCORPORATE  

E-Print Network (OSTI)

] project scheduling inevitably involves uncertainty. The basic inputs (i.e., time, cost, and resourcesPROJECT SCHEDULING: IMPROVED APPROACH TO INCORPORATE UNCERTAINTY USINC BAYESIAN NETWORKS VAHID, there is a causal relationship between these uncertainty sources and project parameters; this causality

Neil, Martin

215

Modeling realistic hybrid flexible flowshop scheduling problems  

Science Journals Connector (OSTI)

This paper aims to contribute to the recent research efforts to bridge the gap between the theory and the practice of scheduling by modelizing a realistic manufacturing environment and analyzing the effect of the inclusion of several characteristics ... Keywords: Hybrid flexible flowshop, Precedence constraints, Realistic scheduling, Sequence-dependent setup times

Rubn Ruiz; Funda Sivrikaya ?erifo?lu; Thijs Urlings

2008-04-01T23:59:59.000Z

216

Electrical Engineering Technology (EET) LONG RANGE SCHEDULE  

E-Print Network (OSTI)

and Machinery C T C T EET 365W Electrical Power & Machinery Laboratory C C, V V C C, V V EET 370T Energy=Virtual Laboratory, W=Web based This schedule is tentative. All Course offerings are subject to minimum enrollmentElectrical Engineering Technology (EET) LONG RANGE SCHEDULE Course Number and Name Fall 2010 Spr

217

Operations scheduling in job-shops  

E-Print Network (OSTI)

This thesis is in the area of operations scheduling in an automated or semi-automated job-shop system, where parts with various routings contend for service on the resources in the system. The classical job-shop scheduling problem has usually been...

Srinivasan, Anand

2012-06-07T23:59:59.000Z

218

Champlain Bridge Montreal: Impacts of  

E-Print Network (OSTI)

Champlain Bridge Montreal: Impacts of Disruptions to Bridge Capacity Prepared for the Federal Bridge Corporation January 2011 #12;Champlain Bridge Montreal: Impacts of Disruptions to Bridge Capacity, Ontario mitl.mcmaster.ca January 2011 #12;Impacts of Champlain Bridge Capacity Reductions Mc

Haykin, Simon

219

45329 SCHEDULING POSTER.ai  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

These courses have immediate open registraton These courses have immediate open registraton PLEASE LOOK FOR US AT http://energy.gov/dvu/professional-skills-and-technical-training OFFICE OF LEARNING & WORKFORCE DEVELOPMENT Professional Skills & Technical Training Program FY 2014 Corporate Schedule Points of Contact: If you have any logistical/registration questions please contact: Shira Kimble at 202-586-8449 or 301-903-5116. Course Title: Course Date: Time: CHRIS Code: Session: Location: Trustworthy Customer Services NEW January 15-16, 2014 8:30am-4:00pm 002452 0001 Forrestal RM GH- 043 CSRS Retirement Seminar January 28-30, 2014 8:30am-4:00pm 000033 0091 Forrestal RM GH- 043 Managing Up Down & Across February 11-12, 2014

220

SLAC - KEK: ISG8 Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Agenda Agenda ISG8 Home Page Working Groups: WG1: Parameters, Design, Instrumentation and Tuning, Bldg.212 Cascades Conference Rm. WG2: Damping Rings and ATF, Bldg.214 Fuji Conference Rm WG3: RF Sources, Orange Rm (half) WG4:Structures, Orange Rm (half) WG5: Ground Motion; Site Requirements and Investigations, Bldg.281 Conventional Facilities Rm. Monday: 09:00 Plenary Sessions (Auditorium) Welcome - J. Dorfan Views from KEK - K. Takata TRC News - G. Loew Goals for ISG-8 - D. Burke / N. Toge Working Group Plans (5 min ea) - WG Conveners 11:00 Working Group Sessions 12:00 Lunch 13:30 Working Group Sessions Tuesday: 09:00 Daily Schedule Update (Orange Rm) - WG Conveners (5min ea) 09:30 Working Group Sessions 12:00 Lunch 13:30 Working Group Sessions Wednesday:

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Inspection/Sampling Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection/Sampling Schedule Inspection/Sampling Schedule Inspection/Sampling Schedule Site Inspection and Water Sampling Schedules Note: The following schedules are subject to change without prior notice and will be updated periodically. Site Name Inspection Date Sampling Week Ambrosia Lake, NM, Disposal Site August 18, 2014 November 20, 2013 Bluewater, NM, Disposal Site August 18, 2014 November 20, 2013 January 28, 2014 May 12, 2014 Boiling Nuclear Superheater (BONUS), PR, Decommissioned Reactor Site Next event 2017 Burrell, PA, Disposal Site December 9, 2013 November 20, 2013 Canonsburg, PA, Disposal Site December 9, 2013 November 19, 2013 Durango, CO, Disposal Site May 19, 2014 June 2, 2014 Durango, CO, Processing Site N/A June 2, 2014 September 1, 2014 Edgemont, SD, Disposal Site June 23, 2014 N/A

222

Routine Operational Environmental Monitoring schedule, CY 1994  

SciTech Connect

This document provides Health Physics (HP) a schedule in accordance with the Environmental Compliance Manual, WHC-CM-7-5, of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) Program during calendar year (CY) 1994. The survey frequencies for particular sites are determined by the technical judgment of EES and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive waste sites are scheduled to be surveyed annually at a minimum. Any newly discovered waste sites not documented by this schedule will be included in the revised schedule for CY 1995. This schedule does not discuss the manpower needs nor does it list the monitoring equipment to be used in completing specific routines.

Schmidt, J.W.

1993-12-01T23:59:59.000Z

223

EIA RECORDS SCHEDULE (EIARS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIA RECORDS SCHEDULE (EIARS) EIA RECORDS SCHEDULE (EIARS) EIA RECORDS SCHEDULE (EIARS) The establishment of the Energy Information Administration (EIA) as an independent statistical agency within the U.S. Department of Energy in 1977 was a result of enabling legislation that charged the EIA to maintain a comprehensive data and information program relevant to energy resources and reserves, energy production, energy demand, energy technologies, and related financial and statistical information relevant to the adequacy of energy resources to meet the Nations demands in the near and longer term future EIA RECORDS SCHEDULE (EIARS) More Documents & Publications Request For Records Disposition ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC, ARCHITECTURAL, ENGINEERING, AND FACILITY MANAGEMENT RECORDS

224

Administrative Records Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administrative Records Schedules Administrative Records Schedules Administrative Records Schedules Administrative Records Schedules NOTE: Most of the files below are in PDF, you will need Acrobat® Reader(tm) to view these files. SCHEDULE TITLE DATE LAST CHANGED AUTHORIZATION NUMBER 1 Personnel Records (pdf) 09/15/10 N1-434-98-4 2 Payroll & Pay Administration Records (pdf) 09/15/10 N1-434-98-5 3 Procurement, Supply, and Grant Records (pdf) 09/15/10 N1-434-98-6 N1-434-95-1 4 Property Disposal Records (pdf) 12/10/10 --- 5 Budget Preparation, Presentation and Apportionment Records (pdf) 12/10/10 N1-434-98-8 6 Accountable Officers' Accounts Records (pdf) 09/15/10 N1-434-98-9 7 Expenditure Accounting Records --- GRS 7 8 Stores, Plants and Cost Accounting Records --- GRS 8

225

Distributed and Networked Dynamic Resource Allocation, Scheduling, and Control Experiments  

E-Print Network (OSTI)

Distributed and Networked Dynamic Resource Allocation, Scheduling, and Control Experiments Nicanor into decentralized and networked dynamic resource allocation, scheduling, and control. 2 Questions 1. What, "Experiments for decentralized and networked dynamic resource allocation, scheduling, and control," Submitted

226

Enhancing feedback process scheduling via a predictive control approach  

E-Print Network (OSTI)

Enhancing feedback process scheduling via a predictive control approach Alessandro Vittorio the application possibilities at an affordable additional cost. Keywords: feedback scheduling; control that preemptive process schedulers in multitasking operating systems can be viewed, and above all designed

Como, Giacomo

227

Energy Efficiency Exchange 2015 Schedule | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Schedule Energy Efficiency Exchange 2015 Schedule The schedule for Energy Efficiency Exchange 2015 is available below. Monday, August 10, 2015 12 p.m.-5:30 p.m. Registration...

228

CTV-1-H Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CTV-1-H Wholesale Power Rate Schedule CTV-1-H Wholesale Power Rate Schedule Area: Tennessee Valley Authority System: CU This rate schedule shall be available to the Tennessee...

229

CBR-1-H Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CBR-1-H Wholesale Power Rate Schedule CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU This rate schedule shall be available to Big Rivers...

230

Approximate resolution of a resource-constrained scheduling problem  

E-Print Network (OSTI)

hard resource-constrained scheduling problem which arises in relation to .... schedules in which the temperature is allowed to increase. 5 ...... Systems & Control.

231

A Mathematical approach applied to train scheduling in Brazilian ...  

E-Print Network (OSTI)

Abstract In this paper, a mathematical approach was used to schedule trains in ... Nowadays, due this criticality, the main decision about the train schedule over.

2014-07-15T23:59:59.000Z

232

Parallel machine match-up scheduling with manufacturing cost considerations  

E-Print Network (OSTI)

approach for the single machine scheduling problem. Journaldecisions on parallel CNC machines: -constraint approach.mechanism for the CNC machine scheduling problems with

Aktrk, M. Selim; Atamtrk, Alper; Grel, Sinan

2010-01-01T23:59:59.000Z

233

CSI-1-H Wholesale Power Rate Schedule | Department of Energy  

Energy Savers (EERE)

Area: Southern Illinois System: CU This rate schedule shall be available to Southern Illinois Power Cooperative (hereinafter the Customer). This rate schedule shall be...

234

ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: RECORDS COMMON TO MOST OFFICES (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES (Revision 2) This schedule provides for the disposal of certain...

235

ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the...

236

ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES...  

Office of Environmental Management (EM)

23: RECORDS COMMON TO MOST OFFICES ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES This schedule covers those administrative management activities not covered by...

237

PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS) PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS) This document lists the...

238

Impact of Soiling and Pollution on PV Generation Performance  

Energy.gov (U.S. Department of Energy (DOE))

This 5-page technical letter addresses air pollution effects on PV performance by quantifying, based on a literature search, the average annual loss due to soiling, the impact of cleaning, and a recommended cleaning schedule.

239

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume I Summary Report, Annual Report to the Texas Commission on Environmental Quality September 2002 August 2003  

E-Print Network (OSTI)

, describes the technology developed to enable the TCEQ to substantiate energy and emissions reduction credits from EE/RE to the Environmental Protection Agency (EPA), and provides valuable insights into the effectiveness of additional energy efficiency...

Haberl, J. S.; Culp, C.; Yazdani, B.; Fitzpatrick, T.; Bryant, J.; Turner, W. D.

2003-01-01T23:59:59.000Z

240

Integration of task abortion and security requirements in GA-based meta-heuristics for independent batch grid scheduling  

Science Journals Connector (OSTI)

Scheduling and resource allocation in large scale distributed environments, such as Computational Grids (CGs), arise new requirements and challenges not considered in traditional distributed computing environments. Among these new requirements, task abortion and security become needful criteria for Grid schedulers. The former arises due to the dynamics of the Grid systems, in which resources are expected to enter and leave the system in an unpredictable way. The latter requirement appears crucial in Grid systems mainly due to a multi-domain nature of CGs. The main aim of this paper is to develop a scheduling model that enables the aggregation of task abortion and security requirements as additional, together with makespan and flowtime, scheduling criteria into a cumulative objective function. We demonstrate the high effectiveness of genetic-based schedulers in finding near-optimal solutions for multi-objective scheduling problem, where all criteria (objectives) are simultaneously optimized. The proposed meta-heuristics are experimentally evaluated in static and dynamic Grid scenarios by using a Grid simulator. The obtained results show the fast reduction of the values of basic scheduler performance metrics, especially in the dynamic case, that confirms the usefulness of the proposed approach in real-life scenarios.

Joanna Ko?odziej; Fatos Xhafa

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Rate Schedule CV-RFS4  

NLE Websites -- All DOE Office Websites (Extended Search)

RFS4 RFS4 (Supersedes Schedule CV-RFS3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR REGULATION AND FREQUENCY RESPONSE SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Regulation and Frequency Response Service (regulation). Character and Conditions of Service: Regulation is necessary to provide for the continuous balancing of resources and interchange with load and for maintaining scheduled interconnection frequency at 60-cycles per second. Formula Rate: The formula rate for regulation includes three components:

242

Global Threat Reduction Initiative | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Global Threat Reduction Global Threat Reduction ... Global Threat Reduction Initiative The Global Threat Reduction Initiative's Alarm Response Training provides training in the area of response for radiological events and provides an opportunity for the security forces, health and safety personnel, and other responsible parties such as the supporting local law enforcement to develop, discuss, and exercise their own tactics, techniques, procedures, and protocols when responding to a theft and/or sabotage event involving radioactive materials of significance. This voluntary program is free, and all expenses (travel, meals, etc.), other than the trainee's training time, will be paid by the GTRI Domestic Threat Reduction Program. Facilities participating in the Domestic Security Program are scheduled for

243

Definition: Scheduling Path | Open Energy Information  

Open Energy Info (EERE)

Scheduling Path Scheduling Path Jump to: navigation, search Dictionary.png Scheduling Path The Transmission Service arrangements reserved by the Purchasing-Selling Entity for a Transaction.[1] Related Terms transmission lines, Purchasing-Selling Entity, Transmission Service, transmission line References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Scheduling_Path&oldid=480301" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation:

244

Definition: Interchange Schedule | Open Energy Information  

Open Energy Info (EERE)

Schedule Schedule Jump to: navigation, search Dictionary.png Interchange Schedule An agreed-upon Interchange Transaction size (megawatts), start and end time, beginning and ending ramp times and rate, and type required for delivery and receipt of power and energy between the Source and Sink Balancing Authorities involved in the transaction.[1] Related Terms Interchange transaction References ↑ Glossary of Terms Used in Reliability Standards An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Interchange_Schedule&oldid=480572" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link

245

DOE HQ Shuttle Bus Route and Schedule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Shuttle Bus Route and Schedule Shuttle Bus Route and Schedule The DOE Shuttle Buses follow the same schedules between the two main Headquarters locations, Forrestal and Germantown. The buses start their routes at each Headquarters facility at the same times, see the schedule below. The subsequent stops at the other facilities are relative to the departure time of each route. Headquarters employees are reminded of the statutory provisions that authorize and limit the use of the shuttle bus service. Specific authority for the use of appropriated funds to pay for transportation for official purposes is contained in section 1344(a)(1) of Title 31, U.S. Code. Use of this transportation for any other purpose is

246

Undergraduate Program Time Limits and Work Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Time Limits and Work Schedules Time Limits and Work Schedules Undergraduate Program Time Limits and Work Schedules Point your career towards LANL: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Contact Student Programs (505) 665-8899 Email Time limits The length of participation in the undergraduate program is limited to a maximum of six years for students pursuing a bachelor's degree and three years for students pursuing an associate's degree. Work schedules Year-round students Students participating in some special undergraduate programs, post-baccalaureate appointments, post-master's appointments, and GRA students working on a thesis or dissertation are excluded from the 30-hour per week work restriction.

247

Graduate Program Time Limits and Work Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Time Limits and Work Schedules Time Limits and Work Schedules Graduate Program Time Limits and Work Schedules Point your career towards LANL: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Contact Student Programs (505) 665-8899 Email Time Limits The length of participation in the graduate program is limited as follows: With a bachelor's pursuing a master's degree: 4 years With a bachelor's pursuing a PhD: 7 years With a master's pursuing a second master's degree: 2 years With a master's pursuing a PhD: 4 years With a master's pursuing a master's and PhD in a new field: 6 years Students may remain in the GRA program for up to three months after receiving their PhD. Work schedules Year-round students Students participating in the MBA program, post-baccalaureate appointments,

248

Batch Queues and Scheduling Policies on Edison  

NLE Websites -- All DOE Office Websites (Extended Search)

Queues and Policies Queues and Scheduling Policies Users submit jobs to a submit queue and wait in line until nodes become available to run a job. NERSC's queue structures are...

249

Transportation resource scheduling in food retail industry  

E-Print Network (OSTI)

The objective of this thesis is to find an appropriate analytical method for scheduling the daily driver tasks in the grocery industry. The goal is to maximize driver utilization. A "Bin-packing" approach is employed to ...

Akkas, Arzum, 1978-

2004-01-01T23:59:59.000Z

250

Production Scheduling with Energy Efficiency Constraints  

E-Print Network (OSTI)

This research is motivated by a real world production scheduling problem in a continuous manufacturing system involving multiple objectives, multiple products and multiple processing lines with various inventory, production and energy efficiency...

Lee, J.; Kozman, T. A.; Wang, X.

2007-01-01T23:59:59.000Z

251

DOE Announces New WIPP Tour Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Announces New WIPP Tour Schedule CARLSBAD, N.M., March 14, 2001 - The U.S. Department of Energy's (DOE) Carlsbad Field Office today announced changes in the public tour program at...

252

Provably Efficient Adaptive Scheduling for Parallel Jobs  

E-Print Network (OSTI)

Scheduling competing jobs on multiprocessors has always been an important issue for parallel and distributed systems. The challenge is to ensure global, system-wide efficiency while offering a level of fairness to user ...

He, Yuxiong

253

PARS II Training Schedule | Department of Energy  

Office of Environmental Management (EM)

will certify that user to receive a PARS II user account. PARSIITrainingSchedule03-06-2014.pdf More Documents & Publications Slide 1 Slide 1 PARS II Course Registration Form...

254

Scheduling of Mobile Robots with Preemptive Tasks  

Science Journals Connector (OSTI)

This paper deals with the problem of scheduling of mobile robots taking into account preemption cases in a ... capability of transporting materials between some machines, mobile robots are able to perform manufac...

Izabela Nielsen; Quang-Vinh Dang

2014-01-01T23:59:59.000Z

255

Online optimization in routing and scheduling  

E-Print Network (OSTI)

In this thesis we study online optimization problems in routing and scheduling. An online problem is one where the problem instance is revealed incrementally. Decisions can (and sometimes must) be made before all information ...

Wagner, Michael R. (Michael Robert), 1978-

2006-01-01T23:59:59.000Z

256

WEBVIEWER INSTRUCTION PACKET Facilities Planning and Scheduling  

E-Print Network (OSTI)

-mail: scheduling@mail.wvu.edu Website: http://facilitiesscheduling.wvu.edu http://webviewer.wvu.edu #12;2 WebViewer: Detailed Instructions Table of Contents Purpose of WebViewer.................................................................................................................................3 Tour of Web

Mohaghegh, Shahab

257

Rate Schedule CV-EID4  

NLE Websites -- All DOE Office Websites (Extended Search)

EID4 EID4 (Supersedes Schedule CV-EID3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR ENERGY IMBALANCE SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Energy Imbalance (EI) service. Character and Conditions of Service: EI is provided when a difference occurs between the scheduled and the actual delivery of energy to a load within the Sub-Balancing Authority (SBA) over an hour or in accordance with approved policies and procedures. The deviation, in megawatts, is the net scheduled amount of

258

Knowledge-Based Design of Scheduling Systems Jrgen Sauer  

E-Print Network (OSTI)

have to decide and control within the scheduling process. In different application areas scheduling1 Knowledge-Based Design of Scheduling Systems Jürgen Sauer Universität Oldenburg, FB Informatik Escherweg 2 D-26121 Oldenburg, Germany sauer@informatik.uni-oldenburg.de Abstract A Scheduling system shall

Appelrath, Hans-Jürgen

259

Survey of Gain-Scheduling Analysis & Design WE.Leithead  

E-Print Network (OSTI)

ranging from aerospace to process control. Despite the wide application of gain-scheduling controllers of gain-scheduling controllers and a diverse academic literature relating to gain- scheduling extendingSurvey of Gain-Scheduling Analysis & Design D.J.Leith WE.Leithead Department of Electronic

Duffy, Ken

260

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume II Technical Report, Annual Report to the Texas Commission on Environmental Quality September 2002 August 2003  

E-Print Network (OSTI)

responsibilities under Texas Health and Safety Code Ann. 388.003, (e) (a) (b) (Vernon Supp. 2002). This annual report: provides an estimate of the energy savings and NOx reductions from energy code compliance in new residential construction in 38 counties...

Haberl, J. S.; Culp, C.; Yazdani, B.; Fitzpatrick, T.; Bryant, J.; Turner, W. D.

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Mexico - Greenhouse Gas Emissions Baselines and Reduction Potentials from  

Open Energy Info (EERE)

Greenhouse Gas Emissions Baselines and Reduction Potentials from Greenhouse Gas Emissions Baselines and Reduction Potentials from Buildings Jump to: navigation, search Name Mexico - Greenhouse Gas Emissions Baselines and Reduction Potentials from Buildings Agency/Company /Organization United Nations Environment Programme Sector Energy Focus Area Buildings Topics Baseline projection, GHG inventory, Pathways analysis, Background analysis Resource Type Publications Website http://www.unep.org/sbci/pdfs/ Country Mexico Central America References Greenhouse Emissions Baselines and Reduction Potentials for Buildings[1] Mexico - Greenhouse Gas Emissions Baselines and Reduction Potentials from Buildings Screenshot "This report represents the first comprehensive description of the factors that determine the present and future impacts of residential and commercial

262

FILM AND VIDEO COLLECTION SCHEDULING REQUEST Date: Send To: Video Scheduling  

E-Print Network (OSTI)

FILM AND VIDEO COLLECTION SCHEDULING REQUEST Date: Requestor: Send To: Video Scheduling Film and Video Collection Department University of Delaware Library (302) 831-8419 FAX (302) 831-6197 Media within seven days, please check out media at the Film and Video Collection Department Service Desk

Cakoni, Fioralba

263

Reducing Pausing at Rich-to-Lean Schedule Transitions: Effects of Variable-Ratio Schedules and Noncontingent Timeouts  

E-Print Network (OSTI)

-schedule component), which may maintain responding in the lean component when there is insufficient reinforcement. 4 General Introduction The Basic Problem: Pausing on FR Schedules Fixed-ratio (FR) schedules require that a certain number of responses occur.... In the context of a FR schedule, pausing may be considered counterproductive (or maladaptive) because it postpones the receipt of a reinforcer for a food-deprived organism. A host of variables affect pausing on FR schedules; for example, pausing increases as a...

Brewer, Adam Thornton

2012-08-31T23:59:59.000Z

264

Effects of a shortened depreciation schedule on the investment costs for combined heat and power  

SciTech Connect

We investigate and compare several generic depreciation methods to assess the effectiveness of possible policy measures with respect to the depreciation schedules for investments in combined heat and power plants in the United States. We assess the different depreciation methods for CHP projects of various sizes (ranging from 1 MW to 100 MW). We evaluate the impact of different depreciation schedules on the tax shield, and the resulting tax savings to potential investors. We show that a shorter depreciation cycle could have a substantial impact on the cost of producing power, making cogeneration more attractive. The savings amount to approximately 6-7 percent of capital and fixed operation and maintenance costs, when changing from the current system to a 7 year depreciation scheme with switchover from declining balance to straight line depreciation. Suggestions for further research to improve the analysis are given.

Kranz, Nicole; Worrell, Ernst

2001-11-15T23:59:59.000Z

265

Energy Aware Scheduling for Weighted Completion Time and Weighted Tardiness  

E-Print Network (OSTI)

The ever increasing adoption of mobile devices with limited energy storage capacity, on the one hand, and more awareness of the environmental impact of massive data centres and server pools, on the other hand, have both led to an increased interest in energy management algorithms. The main contribution of this paper is to present several new constant factor approximation algorithms for energy aware scheduling problems where the objective is to minimize weighted completion time plus the cost of the energy consumed, in the one machine non-preemptive setting, while allowing release dates and deadlines.Unlike previous known algorithms these new algorithms can handle general job-dependent energy cost functions, extending the application of these algorithms to settings outside the typical CPU-energy one. These new settings include problems where in addition, or instead, of energy costs we also have maintenance costs, wear and tear, replacement costs, etc., which in general depend on the speed at which the machine r...

Carrasco, Rodrigo A; Stein, Cliff

2011-01-01T23:59:59.000Z

266

2014 Annual Planning Summary for the NNSA Global Threat Reduction Initiative Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the NNSA Global Threat Reduction Initiative Office.

267

Energy Efficiency / Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Vol. I Summary ReportAnnual Report to the Texas Commission on Environmental Quality, Sept. 2003 to Aug. 2004  

E-Print Network (OSTI)

The Energy Systems Laboratory, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its third annual report, Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions...

Haberl, J. S.; Culp, C.; Yazdani, B.; Gilman, D.; Fitzpatrick, T.; Muns, S.; Verdict, M.; Ahmad, M.; Liu, Z.; Baltazar-Cervantes, J. C.; Bryant, J.; Degelman, L. O.; Turner, W. D.

2004-01-01T23:59:59.000Z

268

EM Quality Assurance Assessment Schedule FY 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DR. STFDlN L. KRAHN DR. STFDlN L. KRAHN DEPUTY ASSlS SAFETY ENVIRONhtENTAL MANAGEMENT SUBJECT: U p d a t e d F i Year 2010 Environmental Mmagemmt Quality Assurance Assessment Schedule AWhed for planuing and coordination purposes is t h e updated Ql&ty Amtrance {OA) asesmmt schedule for the remainder of fiscal year $Y) 2010. . - , The schedule is organized per the various types of QA asmmum@ that will k led by the Office of S t a n e and Quality Assurance (EM-23) or the Field elements. Please provide your feedbadc on the suggested self-atxwssment dates by Monday, Apd 12,2010 (item 2, below). Tht scope a n d tim'mg of plaoned asseasments are designed to be relevant, timely, and & I value to enhaace QA performame of specific projects. EM-23 has developed the attached oversight prioritization methodology plan that takes into

269

Rate Schedule CV-NWT5  

NLE Websites -- All DOE Office Websites (Extended Search)

NWT5 NWT5 (Supersedes Schedule CV-NWT4) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR NETWORK INTEGRATION TRANSMISSION SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Central Valley Project (CVP) Network Integration Transmission Service (NITS). Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points of delivery. This service includes scheduling and system control and dispatch service needed to

270

Scheduling and allocation algorithm for an elliptic filter  

E-Print Network (OSTI)

A new evolutionary algorithm for scheduling and allocation algorithm is developed for an elliptic filter. The elliptic filter is scheduled and allocated in the proposed work which is then compared with the different scheduling algorithms like As Soon As Possible algorithm, As Late As Possible algorithm, Mobility Based Shift algorithm, FDLS, FDS and MOGS. In this paper execution time and resource utilization is calculated using different scheduling algorithm for an Elliptic Filter and reported that proposed Scheduling and Allocation increases the speed of operation by reducing the control step. The proposed work to analyse the magnitude, phase and noise responses for different scheduling algorithm in an elliptic filter.

Marikkannan, Sangeetha

2012-01-01T23:59:59.000Z

271

High level waste storage tank farms/242-A evaporator standards/requirements identification document phase 1 assessment corrective actions/compliance schedule approval report  

SciTech Connect

This document, the Standards/Requirements Identification Document (S/RID) Phase I Assessment Corrective Actions/Compliance Schedule Approval Report for the subject facility, contains the corrective actions required to bring the facility into compliance as a result of an Administrative Assessment to determine whether S/RID requirements are fully addressed by existing policies, plans or procedures. These actions are delineated in the Compliance Schedule Approvals which also contain; noncompliances, risks, compensatory measures, schedules for corrective actions, justifications for approval, and resource impacts.

Biebesheimer, E.

1996-09-30T23:59:59.000Z

272

On dynamic scheduling of a parallel server system with certain graph structure  

E-Print Network (OSTI)

Primitives 2.3 Scheduling Control . Chapter 3 Sequence ofto be mutually independent. Scheduling Control The system isand service rates and scheduling control are allowed to vary

Pesic, Vladimir N.

2011-01-01T23:59:59.000Z

273

An Online Scheduling Algorithm with Advance Reservation for Large-Scale Data Transfers  

E-Print Network (OSTI)

Flow scheduling and endpoint rate control in gridnetworks.granularity and ?ner control in scheduling with a cost ofMukherjee. Control plane for advance bandwidth scheduling in

Balman, Mehmet

2012-01-01T23:59:59.000Z

274

Space-Time Power Scheduling of MIMO LinksFairness and QoS Considerations  

E-Print Network (OSTI)

design of link scheduling and power control. This would be aPower control, beamforming and link scheduling are alllink scheduling (temporal freedom) with MIMO power control (

Rong, Yue; Hua, Yingbo

2008-01-01T23:59:59.000Z

275

Energy Consumption Scheduling in Smart Grid: A Non-Cooperative Game Approach  

E-Print Network (OSTI)

on Game- Theoretic Energy Consumption Scheduling for theIn this paper, energy consumption scheduling based on non-Energy Consumption Scheduling in Smart Grid: A Non-

Ma, Kai; Hu, Guoqiang; Spanos, Costas J

2014-01-01T23:59:59.000Z

276

Campus Energy, Water, and Waste Reduction Policy Page 1 of 7 Virginia Polytechnic Institute and State University No. 5505 Rev.: 2  

E-Print Network (OSTI)

Campus Energy, Water, and Waste Reduction Policy Page 1 of 7 Virginia Polytechnic Institute __________________________________________________________________________________ Subject: Campus Energy, Water, and Waste Reduction Policy the highest standards in energy/water usage and waste reduction with consideration of the impact

Virginia Tech

277

Crosswalk between DOERS and Admin Schedules  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2/00 2/00 Cross-Walk -DOERS to Admin Sched rev2.wpd DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules DOERS Item Number Description of Records DOE Administrative or Programmatic Schedule Number / Item NARA Case Number DOERS 1, Medical, Health and Safety Records DOERS 1, Item 1a Safety Management Records DOE Admin18, Item 11.1a, NC-326-75-2 DOERS 1, item 1 (b, c, d, & e) Safety Management Records DOE Admin 18, item 11.1 (c, d, e & f) II NNA-1023(2) II NNA-310(6) II NNA-1023(3) II NNA-409(25) DOERS 1, Item 2 Fire Unit Records DOE Admin18 ,Item 11.4 (a thru g) NC-430-76-2(3) II NNA-1858(1B) II NNA-2939 II NNA-1858(1C) II NNA-1858(E) II NNA-1858(1F) DOERS 1, Item 3 Medical or Health Research Project Case Files R & D Programmatic Schedule

278

Scheduling with Advanced Process Control Constraints  

E-Print Network (OSTI)

companies have to pay great attention to lower their produc- tion costs and guarantee high quality machine parameters so as to achieve satisfactory product quality. When there is a conflict between quality and scheduling ob- jectives, quality usually has to be satisfied. This paper studies the interaction between

Hasenbein, John

279

Hanford Treats Groundwater Ahead of Schedule  

Energy.gov (U.S. Department of Energy (DOE))

RICHLAND, Wash. EMs Richland Operations Office and contractor CH2M HILL Plateau Remediation Company (CH2M HILL) are ahead of schedule in meeting EM's annual goals for treating contaminated groundwater at the Hanford site in southeast Washington state.

280

Energy Conscious Scheduling Johnatan E. Pecero  

E-Print Network (OSTI)

Energy Conscious Scheduling Johnatan E. Pecero University of Luxembourg January 18, 2012 Green Days of Luxembourg Friday, January 20, 2012 #12;Johnatan E. Pecero Green Approaches · Hardware approach ­ Energy, microsoft) 9 Friday, January 20, 2012 #12;Johnatan E. Pecero Green Approaches · Hardware approach ­ Energy

Lefèvre, Laurent

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Advance Resource Provisioning in Bulk Data Scheduling  

SciTech Connect

Today?s scientific and business applications generate mas- sive data sets that need to be transferred to remote sites for sharing, processing, and long term storage. Because of increasing data volumes and enhancement in current net- work technology that provide on-demand high-speed data access between collaborating institutions, data handling and scheduling problems have reached a new scale. In this paper, we present a new data scheduling model with ad- vance resource provisioning, in which data movement operations are defined with earliest start and latest comple- tion times. We analyze time-dependent resource assign- ment problem, and propose a new methodology to improve the current systems by allowing researchers and higher-level meta-schedulers to use data-placement as-a-service, so they can plan ahead and submit transfer requests in advance. In general, scheduling with time and resource conflicts is NP-hard. We introduce an efficient algorithm to organize multiple requests on the fly, while satisfying users? time and resource constraints. We successfully tested our algorithm in a simple benchmark simulator that we have developed, and demonstrated its performance with initial test results.

Balman, Mehmet

2012-10-01T23:59:59.000Z

282

ALA-1-N Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ALA-1-N Wholesale Power Rate Schedule ALA-1-N Wholesale Power Rate Schedule ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina This rate schedule shall be available to the PowerSouth Energy Cooperative. This rate schedule shall be applicable to power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters, and Richard B. Russell Projects and sold under contract between the Cooperative and the Government. This rate schedule does not apply to energy from pumping operations at the Carters and Richard B. Russell Projects. Document Available for Download ALA-1-N Rate Schedule More Documents & Publications MISS-1-N Wholesale Power Rate Schedule

283

CM-1-H Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule Area: MEAM, MDEA, and SMEPA System: CU This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency. This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CM-1-H Rate Schedule More Documents & Publications CEK-1-H Wholesale Power Rate Schedule CSI-1-H Wholesale Power Rate Schedule

284

CM-1-H Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule Area: MEAM, MDEA, and SMEPA System: CU This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency. This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CM-1-H Rate Schedule More Documents & Publications CEK-1-H Wholesale Power Rate Schedule CSI-1-H Wholesale Power Rate Schedule

285

Gain Scheduled Control Using the Dual Youla Parameterization  

E-Print Network (OSTI)

Stability is a critical issue in gain-scheduled control problems in that the closed loop system may not be stable during the transitions between operating conditions despite guarantees that the gain-scheduled controller stabilizes the plant model...

Chang, Young Joon

2011-08-08T23:59:59.000Z

286

Weapon Scheduling Method for Cooperative Air-Defense Operation  

Science Journals Connector (OSTI)

By defining the weapon scheduling plan and weapon combat action, the mathematical formulation of weapon scheduling problem for cooperative air-defense operation ... the basis of discussing the primary constraints...

Liang Yu; Changfeng Xing

2012-01-01T23:59:59.000Z

287

A Modified Energy Saving Scheduling Algorithm on Heterogeneous Systems  

Science Journals Connector (OSTI)

Efficient application scheduling with low energy consumption is critical for achieving high performance ... a new schedule scheme which concentrates on the energy consumption of supply voltages varying and a mod...

An Shen; Yuming Xu

2014-01-01T23:59:59.000Z

288

University at Buffalo (SUNY) Department of Industrial Engineering Scheduling Theory  

E-Print Network (OSTI)

University at Buffalo (SUNY) Department of Industrial Engineering IE 661 Scheduling Theory Chapter 1 Rakesh Nagi Department of Industrial Engineering University at Buffalo (SUNY) #12;University at Buffalo (SUNY) Department of Industrial Engineering Chapter 1: Introduction Role of Scheduling Allocation

Nagi, Rakesh

289

Y-12 Finishes Initial HEUMF Loading Ahead of Schedule | National...  

National Nuclear Security Administration (NNSA)

Production Office NPO News Releases Y-12 Finishes Initial HEUMF Loading Ahead of Schedule Y-12 Finishes Initial HEUMF Loading Ahead of Schedule applicationmsword icon NR-01-10...

290

ESPC Task Order Schedules and Placement of Pricing Information  

Energy.gov (U.S. Department of Energy (DOE))

Document provides task order (TO) schedule descriptions and information on the placement of pricing for energy savings performance contracts (ESPCs).

291

Dynamic Multilevel Hybrid Scheduling Algorithms for Grid Computing  

Science Journals Connector (OSTI)

A Grid is an infrastructure for resource sharing. It is used for large-scale data processing, many of the applications being scientific ones. Grid scheduling is a vital component of a Grid infrastructure. Reliability, efficiency (in terms of time consumption) and effectiveness in resource utilization are the desired characteristics of Grid scheduling systems. Many algorithms have been developed for Grid scheduling. In our previous work, we proposed two scheduling algorithms (the Multilevel Hybrid Scheduling Algorithm and the Multilevel Dual Queue Scheduling Algorithm) for optimum utilization of processors in a Grid computing environment. In this paper, we propose two more flavours of Multilevel Hybrid scheduling algorithms; i.e. the Dynamic Multilevel Hybrid Scheduling Algorithm using Median and the Dynamic Multilevel Hybrid Scheduling Algorithm using Square root. We evaluate our proposed Grid scheduling using real workload traces, taken from leading computational centers. The main idea of the proposed algorithms is to execute jobs optimally, i.e. with minimum average waiting, turnaround and response times. An extensive performance comparison is presented using real workload traces to evaluate the efficiency of scheduling algorithms. To facilitate the research, a software tool has been developed which produces a comprehensive simulation of a number of Grid scheduling algorithms. The tool's output is in the form of scheduling performance metrics. The experimental results, based on performance metrics, demonstrate that the performances of our Grid scheduling algorithms give good results. Our proposed scheduling algorithms also support true scalability, that is, they maintain an efficient approach when increasing the number of processors or nodes. This paper also includes a statistical analysis of real workload traces to present the nature and behavior of jobs. Our proposed scheduling algorithms are unique. They have three key features. First, they favor the shortest job for execution. Second, they execute the job on the basis of a dynamic time quantum, to fairly distribute processor time among Grid jobs. A third feature is that they always execute the longest job, thus avoiding starvation.

Syed Nasir Mehmood Shah; Ahmad Kamil Bin Mahmood; Alan Oxley

2011-01-01T23:59:59.000Z

292

5 - Load Balance Scheduling for Cloud Data Centers  

Science Journals Connector (OSTI)

This chapter introduces online load balance scheduling for Cloud data centers. One of the challenging scheduling problems in Cloud data centers is the allocation and migration of reconfigurable virtual machines and integrated features of hosting physical machines. We first propose an online resource scheduling algorithm (OLRSA), which considers real-time and multidimensional resource scheduling. Besides OLRSA, a Lowest Integrated-load First Algorithm (LIF) is also introduced. Performance evaluation of both algorithms against other existing algorithms is provided by simulation.

Wenhong Tian; Yong Zhao

2015-01-01T23:59:59.000Z

293

Order Acceptance and Scheduling Problem in Two-machine Flow ...  

E-Print Network (OSTI)

Jul 29, 2014 ... Order Acceptance and Scheduling Problem in Two-machine Flow Shops: New Mixed Integer Programming Formulations.

Rasul Esmaeilbeigi

2014-07-29T23:59:59.000Z

294

Efficient Scheduling and Grant Sizing Methods for WDM PONs  

Science Journals Connector (OSTI)

Bandwidth allocation and transmission grant scheduling are problems of particular interest to multichannel passive optical networks (PONs). While ...

Kiaei, Mohammad S; Meng, Lehan; Assi, Chadi; Maier, Martin

2010-01-01T23:59:59.000Z

295

Hybrid Time Formulation for Diesel Blending and Distribution Scheduling  

Science Journals Connector (OSTI)

Hybrid Time Formulation for Diesel Blending and Distribution Scheduling ... Schematic of diesel in-line blending and distribution infrastructure. ...

Srgio M. S. Neiro; Valria V. Murata; Jos M. Pinto

2014-06-13T23:59:59.000Z

296

Project Title: VIscosity Reduction Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

297

Using a SAT-solver to schedule sports leagues  

Science Journals Connector (OSTI)

Tournament schedules of sports leagues have to satisfy several types of constraints such as stadium unavailability, fixed matches, forbidden matches, minimum number of breaks. Usually, there is no schedule satisfying all given constraints and, hence, ... Keywords: Propositional satisfiability, Round robin tournaments, Soft constraints, Sports, Sports league scheduling, Timetabling

Andrei Horbach; Thomas Bartsch; Dirk Briskorn

2012-02-01T23:59:59.000Z

298

Design and Evaluation of a Feedback Control EDF Scheduling Algorithm *  

E-Print Network (OSTI)

Design and Evaluation of a Feedback Control EDF Scheduling Algorithm * * Supported in part by NSF. In this paper, we present a feedback control real­time scheduling algorithm and its evaluation. Performance}@cs.virginia.edu, + gt9s@virginia.edu Abstract Despite the significant body of results in real­time scheduling, many real

Son, Sang H.

299

Symbolic Scheduling Techniques 1 Ivan Radivojevi c, Forrest Brewer  

E-Print Network (OSTI)

- constrained scheduling which allows speculative operation execution in arbitrary forward-branching control subject to data/control-flow dependencies and resource constraints. Priority- based heuristic scheduling on detection of mutual exclusiveness in control/data-flow graphs (CDFGs). Tree scheduling (TS) [8] uses a tree

Brewer, Forrest D.

300

Stochastic Sensor Scheduling for Networked Control Systems Farhad Farokhi  

E-Print Network (OSTI)

Stochastic Sensor Scheduling for Networked Control Systems Farhad Farokhi and Karl H. Johansson Abstract Optimal sensor scheduling with applications to networked estimation and control systems to optimal control of Markov chains, we extract an optimal scheduling policy to fairly allocate the network

Johansson, Karl Henrik

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Queueing-Theoretic Approaches for Dynamic Scheduling: Daria Terekhova  

E-Print Network (OSTI)

, 1999) Scheduling and control of flexible manufacturing sys- tems: a critical review (Basnet and MizeQueueing-Theoretic Approaches for Dynamic Scheduling: A Survey Daria Terekhova , Douglas G. DownbMaster University, Canada downd@mcmaster.ca Within the combinatorial scheduling community, there has been

Down, Doug

302

Constraint-based Scheduling Markus P.J. Fromherz  

E-Print Network (OSTI)

such as product assembly se- quencing. This makes constraint-based scheduling interesting to the control community planning, scheduling, and control tasks. This tutorial gives a brief introduction to constraint and reconfigurable con- trol, and the integration of various planning, scheduling, and control tasks

Fromherz, Markus P.J.

303

The Control of Burstiness in Fair Queueing Scheduling Liat Ashkenazi  

E-Print Network (OSTI)

The Control of Burstiness in Fair Queueing Scheduling Liat Ashkenazi and Hanoch Levy School to other scheduling algorithms. Those algorithms, in contrast, are subject to the burstiness problem. This paper studies the issue of bursty transmission in packet scheduling algo- rithms. We propose the Burst

Levy, Hanoch

304

Design of Gain-Scheduled Strictly Positive Real Controllers  

E-Print Network (OSTI)

Design of Gain-Scheduled Strictly Positive Real Controllers Using Numerical Optimization the linear SPR controllers, which compose the gain-scheduled controller. Second, we formulate the optimization problem associ- ated with the gain-scheduled controller itself. Restricting our in- vestigation

Damaren, Christopher J.

305

Energy Efficient Scheduling with Power Control for Wireless Networks  

E-Print Network (OSTI)

Energy Efficient Scheduling with Power Control for Wireless Networks Bastian Katz Institute the complexity of scheduling with power control in the SINRG model of interference. Based on a novel scheme) and less energy consumption: power control admits schedules that would otherwise violate interference

Paris-Sud XI, Université de

306

Feedback Control RealTime Scheduling: Framework, Modeling, and Algorithms *  

E-Print Network (OSTI)

1 Feedback Control Real­Time Scheduling: Framework, Modeling, and Algorithms * Chenyang Lu John A}@virginia.edu Abstract This paper presents a feedback control real­time scheduling (FCS) framework for adaptive real. In particular, we establish a dynamic model and performance analysis of several feedback control scheduling

Son, Sang H.

307

Multichannel Scheduling and Its Connection to Queueing Network Control Problem  

E-Print Network (OSTI)

Multichannel Scheduling and Its Connection to Queueing Network Control Problem Pouya Tehrani , Qing scheduling problem and a closed queueing network control problem which is known to be EXP-complete, we obtain {potehrani,qzhao}@ucdavis.edu Abstract--We consider the multichannel scheduling problem where the data rate

Islam, M. Saif

308

Computing Schedules for Time-Triggered Control using Genetic Algorithms  

E-Print Network (OSTI)

Computing Schedules for Time-Triggered Control using Genetic Algorithms Truong Nghiem Georgios E scheduling problem for timed-triggered controllers (OSTTC) and the time complexity of the corresponding search. Keywords: Scheduling; Digital control; Genetic algorithms; 1. INTRODUCTION Digital control theory

Fainekos, Georgios E.

309

Scheduling and Feedback Co-Design for Networked Control Systems  

E-Print Network (OSTI)

Scheduling and Feedback Co-Design for Networked Control Systems Michael S. Branicky,1 Stephen M mes- sages are transmitted). In the past, control system design and CPU scheduling or network scheduling design have normally been sepa- rated. This separation has allowed the control commu- nity

Branicky, Michael S.

310

A Cooperative Approach for Job Shop Scheduling under Uncertainties  

E-Print Network (OSTI)

control, consists to use a two-level resolution scheme: an off-line scheduling level builds upA Cooperative Approach for Job Shop Scheduling under Uncertainties C. BRIANDa,1 , S. OURARIb and B on job shop scheduling problems in a cooperative environment. Unlike classical deterministic approaches

Briand, Cyril

311

A QUALITY CONTROL FRAMEWORK FOR BUS SCHEDULE RELIABILITY  

E-Print Network (OSTI)

A QUALITY CONTROL FRAMEWORK FOR BUS SCHEDULE RELIABILITY JIE LIN*, University of Illinois Institute A QUALITY CONTROL FRAMEWORK FOR BUS SCHEDULE RELIABILITY Abstract This paper develops and demonstrates a quality control framework for bus schedule reliability. Automatic Vehicle Location (AVL) devices

Illinois at Chicago, University of

312

Feedback Control Real-Time Scheduling: Framework, Modeling, and Algorithms*  

E-Print Network (OSTI)

1 Feedback Control Real-Time Scheduling: Framework, Modeling, and Algorithms* Chenyang Lu John A}@virginia.edu Abstract This paper presents a feedback control real-time scheduling (FCS) framework for adaptive real. In particular, we establish a dynamic model and performance analysis of several feedback control scheduling

Son, Sang H.

313

A Novel Approach to Workflow Scheduling in MediGRID  

E-Print Network (OSTI)

A Novel Approach to Workflow Scheduling in MediGRID Dietmar Sommerfeld1 and Harald Richter2 If (Hardware and Robotics) #12;A Novel Approach to Workflow Scheduling in MediGRID Dietmar Sommerfeld1 four problems inherent to Grid scheduling that could be identified by means of measurements in the D-Grid

Zachmann, Gabriel

314

A New I/O Scheduler for Solid State Devices  

E-Print Network (OSTI)

parameters of solid state drives. Using the information from the parameter extraction, we present a new I/O scheduler design which utilizes the structure of solid state devices to efficiently schedule writes. The new scheduler, implemented on a 2.6 Linux...

Dunn, Marcus P.

2010-10-12T23:59:59.000Z

315

ON THE CONFIGURATION-LP FOR SCHEDULING ON UNRELATED MACHINES  

E-Print Network (OSTI)

ON THE CONFIGURATION-LP FOR SCHEDULING ON UNRELATED MACHINES JOS? VERSCHAE AND ANDREAS WIESE Abstract. One of the most important open problems in machine scheduling is the problem of scheduling a set of jobs on unrelated machines to minimize the makespan. The best known approximation algorithm

Nabben, Reinhard

316

Opportunistic Scheduling for utility maximization under QoS constraints  

E-Print Network (OSTI)

1 Opportunistic Scheduling for utility maximization under QoS constraints Neung-Hyung Lee, Jin. Our opportunistic scheduling aims at maximizing the utility which is usually expressed as a function of user throughput. In this paper we derive an off-line optimal scheduling policy by optimization theory

Bahk, Saewoong

317

Utility Accrual Real-Time Scheduling for Multiprocessor Embedded Systems  

E-Print Network (OSTI)

Utility Accrual Real-Time Scheduling for Multiprocessor Embedded Systems Hyeonjoong Cho a Binoy We present the first Utility Accrual (or UA) real-time scheduling algorithm for mul- tiprocessors, called global Multiprocessor Utility Accrual scheduling algorithm (or gMUA). The algorithm considers

Ravindran, Binoy

318

PREEMPTIVE RESUME SCHEDULING Alain Roy and Miron Livny  

E-Print Network (OSTI)

Chapter 9 CONDOR AND PREEMPTIVE RESUME SCHEDULING Alain Roy and Miron Livny Department of Computer. This introduces a number of problems, some of which are solved by Condor's preemptive resume scheduling, which is the focus of this paper. Pre- emptive resume scheduling allows jobs to be interrupted while running

Roy, Alain

319

Evaluate Greenhouse Gas Reduction Strategies Using Renewable Energy in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Evaluate Greenhouse Gas Reduction Strategies Using Renewable Energy Evaluate Greenhouse Gas Reduction Strategies Using Renewable Energy in Buildings Evaluate Greenhouse Gas Reduction Strategies Using Renewable Energy in Buildings October 7, 2013 - 11:23am Addthis Once Federal sites have been screened for viability of different renewable energy resources to evaluate emissions profile, the next step is to establish what renewable energy resources developed at which particular sites would have the greatest impact on the agency's overall greenhouse gas (GHG) emissions goals. It is important to consider that some types of renewable energy generation could impact not only Scope 1 and 2 GHG goals, but also Scope 3 goals through avoided transmission and distribution losses. Estimate Greenhouse Gas Reduction Potential It is important to note that solar systems can have the greatest reduction

320

Reduction of fuel consumption  

Science Journals Connector (OSTI)

Replacing standard oil pumps with bypass control by regulated oil pumps with variable oil pressure which adapt their variable oil pumping quantity to the engine oil pressure requirements promises reductions in fuel

Dieter Voigt

2003-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

A Joint Transmission Grant Scheduling and Wavelength Assignment in Multichannel SG-EPON  

Science Journals Connector (OSTI)

In this paper, we investigate the problem of transmission grant scheduling in multichannel optical access networks using a scheduling theoretic ...

Meng, Lehan; El-Najjar, Jad; Alazemi, Hamed; Assi, Chadi

2009-01-01T23:59:59.000Z

322

Process for Scheduling Electives The Student Affairs/MSP Office collects core clerkship scheduling requests from rising M-3 and  

E-Print Network (OSTI)

rotations for this time and have no control over other schools' scheduling processes. wwwUICOM - UC Process for Scheduling Electives The Student Affairs/MSP Office collects core clerkship scheduling requests from rising M-3 and M-4 students. Individual clinical departments arrange other

Gilbert, Matthew

323

Abstract--A simple method is presented to reduce the number of scheduling parameters for gain-scheduled  

E-Print Network (OSTI)

to a zero- parameter or LTI controller design problem in the dimensionless domain. The dimensionless gain-scheduling. Index Terms--Gain scheduling, gantry control, pi theorem, dimensionless parameters, nondimensional representation I. INTRODUCTION AIN scheduling is a popular method to control systems whose linearized model

Brennan, Sean

324

2014 Review of the Potential Impact of DOE Excess Uranium Inventory On the Commercial Markets  

Energy.gov (U.S. Department of Energy (DOE))

Energy Resources International (ERI), Inc conducted this independent market impact analysis on DOE planned uranium sales and transfers during the period 2014 to 2033, based on information concerning quantities and schedules provided to ERI by DOE.

325

Impact of Clean Diesel Technology on Climate Change | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Clean Diesel Technology on Climate Change Impact of Clean Diesel Technology on Climate Change 2004 Diesel Engine Emissions Reduction (DEER) Conference Presentation: Brookhaven...

326

Jefferson Lab Science Series - Current Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Current Science Series Schedule Current Science Series Schedule Lectures are free and open to students and adults with an interest in science. All lectures begin at 7:00 pm in CEBAF Center Auditorium [Download a Map] [Locate Jefferson Lab on Google Maps] [Display a QR Code for Scanning] and last for about an hour. Seating in the CEBAF Center Auditorium and overflow area is limited to about 300 people. Seating is on a first come, first served basis. Unfortunately, people arriving once capacity has been reached will be turned away. A live video stream will be available for those not able to attend in person. Lectures will be added to the video archive for on-demand viewing upon approval from the presenter. NOTICE: For security purposes, everyone over 16 is asked to carry a photo I.D. Security guards may inspect vehicles, book bags and purses.

327

Proposal Submittal and Scheduling Procedures for Macromolecular  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Submittal and Scheduling Procedures for Macromolecular Proposal Submittal and Scheduling Procedures for Macromolecular Crystallography Beam time for macromolecular crystallography projects is obtained by submitting an SSRL Macromolecular Crystallography Proposal. This proposal is peer reviewed by the Structural Molecular Biology and Biophysics subpanel of the SSRL Proposal Review Panel (PRP) for scientific merit and rating and for criticality of synchrotron radiation use. Proposal Forms New Proposal Request Form (note: you must be a registered user to submit a proposal through our User Portal. Click on "Become a New User" link to register.) Extension Application for Macromolecular Crystallography Proposals Rapid Access Application Form Types of Proposals Proposals should be submitted under one of the following classifications.

328

Physical Chemistry of Ionic Liquids Symposium Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

(Tentative Schedule, locations and times to be determined) (Tentative Schedule, locations and times to be determined) Sunday Morning Structure and Heterogeneity of Ionic Liquids I. James Wishart and Edward Castner Introductory Remarks Andre Pinkert Hydroxyamine ionic liquids and their properties Thomas Strassner TAAILs - Tunable Aryl-Alkyl Ionic Liquids: A new generation of ionic liquids Laura Sprunger Grubbs Thermodynamic Properties of New Generation Ionic Liquids Christopher Hardacre Prediction methods for physical properties of ionic liquids BREAK Patricia Hunt What happens when you functionalise an ionic liquid with a "silicone" side chain? Edward L Quitevis Effect of cation symmetry and nanoscale segregation on the morphology, physical properties, and low-frequency vibrational dynamics of 1,3-dialkylimidazolium cation ionic liquids

329

Rate Schedule COTP-T3  

NLE Websites -- All DOE Office Websites (Extended Search)

COTP-T3 COTP-T3 (Supersedes Schedule COTP-T2) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CALIFORNIA-OREGON TRANSMISSION PROJECT SCHEDULE OF RATE FOR POINT-TO-POINT TRANSMISSION SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving California-Oregon Transmission Project (COTP) firm and/or non-firm point-to-point (PTP) transmission service. Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points of

330

Hilton Alexandria Mark Center Shuttle Schedule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hilton Alexandria Mark Center Shuttle Schedule Hilton Alexandria Mark Center Shuttle Schedule 5000 Seminary Road, Alexandria, VA 22311 703-845-1010 The Hilton Alexandria Mark Center offers complimentary shuttle service every half hour at :00 and :30, 7 days a week. Our first departure from the hotel is 6:00 AM and our last departure from the hotel is 10:30 pm, to Pentagon City Mall/Metro (on the blue and yellow line) and Ronald Reagan Washington National Airport The van arrives at Pentagon City at approximately 10 and 40 minutes after the hour. Our last pick up is at approximately 10:40pm. Upon exiting the metro, exit left, and take the escalator outside. We pick up at the island in front of the Ritz Carlton and Fashion Center Mall. The next stop is Ronald Reagan Washington National Airport The van arrives at the airport at approximately 20 and 50 minutes after the

331

Rate Schedule CV-F13  

NLE Websites -- All DOE Office Websites (Extended Search)

F13 F13 (Supersedes Schedule CV-F12) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATES FOR BASE RESOURCE AND FIRST PREFERENCE POWER Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To the Base Resource (BR) and First Preference (FP) Power Customers. Character and Conditions of Service: Alternating current, 60-hertz, three-phase, delivered and metered at the voltages and points established by contract. This service includes the Central Valley Project (CVP) transmission (to include reactive supply and voltage control from Federal generation sources needed to support

332

Rate Schedule CV-TPT7  

NLE Websites -- All DOE Office Websites (Extended Search)

TPT7 TPT7 (Supersedes Schedule CV-TPT6) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR TRANSMISSION OF WESTERN POWER BY OTHERS Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To Western's power service customers who require transmission service by a third party to receive power sold by Western. Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points as

333

Duke-1-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

334

Replacement-1 Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Area: Replacement Energy System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer. Document Available for Download Replacement-1 Rate Schedule More Documents & Publications Replacement-3 Wholesale Power Rate Schedule

335

CC-1-I Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule Area: Carolina Power & Light Company, Western Division System: CU This rate schedule shall be available to public bodies and cooperatives served through the facilities of Carolina Power & Light Company, Western Division (hereinafter called the Customers). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CC-1-I Rate Schedule More Documents & Publications CM-1-H Wholesale Power Rate Schedule

336

Santee-3-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule Santee-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be scheduled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

337

Santee-1-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule Santee-1-E Wholesale Power Rate Schedule Area: Central, Bamberg, and Georgetown System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be wheeled and scheduled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

338

Pump-2 Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Wholesale Power Rate Schedule 2 Wholesale Power Rate Schedule Pump-2 Wholesale Power Rate Schedule Area: Carters & Russell Pumping-Self Schedulers System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives who provide their own scheduling arrangement and elect to allow Southeastern to use a portion of their allocation for pumping (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale energy generated from pumping operations at the Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and

339

Integrated test schedule for buried waste integrated demonstration  

SciTech Connect

The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ``windows of opportunity`` schedule. The ``windows of opportunity`` schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M.

Brown, J.T.; McDonald, J.K.

1992-05-01T23:59:59.000Z

340

Integrated test schedule for buried waste integrated demonstration  

SciTech Connect

The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration windows of opportunity'' schedule. The windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M.

Brown, J.T.; McDonald, J.K.

1992-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Duke-4-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina served through the transmission facilities of Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

342

CC-1-I Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule Area: Carolina Power & Light Company, Western Division System: CU This rate schedule shall be available to public bodies and cooperatives served through the facilities of Carolina Power & Light Company, Western Division (hereinafter called the Customers). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CC-1-I Rate Schedule More Documents & Publications CM-1-H Wholesale Power Rate Schedule

343

Adaptable search neighborhoods for Resource Constrained Scheduling  

E-Print Network (OSTI)

dispatching rule. When evaluating the merit of the schedule associated with (L, p), the original data set, ps, is usecl. Three msiu advantages result from the use of these new search spaces. First, problem specific knowledge is incorporated into the search...) dispatching if the perfcrmance is based on completion times (makespsn. or f. . 'ow-tirres), or use earliest-due-date (EDD) dispatching if the performance is due-dste based (tardiness). In order to illustrate the implementation of these concepts, examples...

Balakrishnan, Ramamoorthy

1993-01-01T23:59:59.000Z

344

Site Specific Records Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Specific Records Schedules Site Specific Records Schedules Site Specific Records Schedules NOTE: Most of the files below are in PDF, you will need Acrobat® Reader(tm) to view these files. TITLE DATE LAST CHANGED AUTHORIZATION NUMBER AEC -- Administrative Record (pdf) 01/15/01 II-NNA-6754 AEC -- Nuclear Power Plant Docket Records (pdf) 01/15/01 NC-174-231 AEC -- Power Reactor Records (pdf) 01/15/01 II-NNA-2110 Alaska Power Administration (pdf) 02/09/01 N1-447-97-1 Appointee Clearance and Vetting Files (pdf) 09/10/02 N1-434-96-3 Bettis Atomic Laboratory Naval Reactors (pdf) 09/09/91 N1-434-91-8 Bonneville Power Administration (pdf) 08/06/07 N1-305-07-1 Cyclotron Records, Lawrence Berkeley National Laboratory (pdf) 12/22/88 N1-434-89-7 Energy Information Administration (EIARS) (pdf) 10/21/03 N1-434-96-2

345

Hanford Site Environmental Surveillance Master Sampling Schedule  

SciTech Connect

Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program: and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling design is described in the Operations Office, Environmental Monitoring Plan, United States Department of Energy, Richland DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY 2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2000 in which case the anticipated year for collection is provided. In addition, a map showing approximate sampling locations is included for each media scheduled for collection.

LE Bisping

2000-01-27T23:59:59.000Z

346

Weekly Natural Gas Storage Report Schedule  

Weekly Natural Gas Storage Report (EIA)

Weekly Natural Gas Storage Report Schedule Weekly Natural Gas Storage Report Schedule Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Thursdays with the following exceptions. All times are Eastern. Alternate Release Date Release Day Release Time Holiday 11/27/2013 Wednesday 12:00 p.m. 11/28/2013 (Thursday) is Thanksgiving Day 12/27/2013 Friday 10:30 a.m. 12/25/2013 (Wednesday) is Christmas Day 1/3/2014 Friday 10:30 a.m. 1/1/2014 (Wednesday) is New Year's Day 11/14/2014 Friday 10:30 a.m. 11/11/2014 (Tuesday) is Veterns Day 11/26/2014 Wednesday 12:00 p.m. 11/27/2014 (Thursday) is Thanksgiving Day 12/24/2014 Wednesday 12:00 p.m. 12/25/2014 (Thursday) is Christmas Day 12/31/2014 Wednesday 12:00 p.m. 1/1/2015 (Thursday) is New Year's Day

347

Drag reduction in coal log pipelines  

SciTech Connect

It is well-known that solutions of dissolved long-chain macromolecules produce lower friction or drag losses than with the solvent alone. In coal log pipeline (CLP), water is the conveying medium. Synthetic polymers such as poly(ethylene oxide) have been dissolved in water and tested for their extent of drag reduction as a function of concentration and other variables. Lab-scale experimental results for CLP indicate substantial drag reduction at low concentration levels of polymer. But, the macromolecules exhibit degradation under mechanical shear stresses. The large molecules break into smaller units. This degradation effect causes a loss of drag reduction. However, high levels of drag reduction can be maintained as follows: (1) by injecting polymer into the CLP at several locations along the pipeline, (2) by injecting polymer of different particle sizes, (3) by using more robust types of polymers, or (4) by using polymer-fiber mixtures. This report presents the value of drag-reducing agents in terms of pumping power net cost savings. In addition, this report outlines the environmental impact of drag reduction polymers, and end-of-pipeline water treatment processes. For an operating CLP, hundreds of miles in length, the use of poly(ethylene oxide) as a drag reducing agent provides significant pumping power cost savings at a minimal materials cost.

Marrero, T.R.; Liu, H. [Univ. of Missouri, Columbia, MO (United States). Capsule Pipeline Research Center

1996-12-31T23:59:59.000Z

348

Global Threat Reduction Initiative  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

comprehensive comprehensive strategy to prevent nuclear terrorism; and  The key organization responsible for implementing the U.S. HEU minimization policy. GTRI MISSION Reduce and protect vulnerable nuclear and radiological material located at civilian sites worldwide. DOE STRATEGIC GOAL 2.2 Prevent the acquisition of nuclear and radiological materials for use in weapons of mass destruction and other acts of terrorism Protect high priority nuclear and radiological materials from theft and sabotage These efforts result in threat reduction by improving security on the bomb material remaining at civilian sites - each vulnerable building that is protected reduces the risk until a permanent threat reduction solution can be implemented.

349

EIS-0236: Notice of Intent to Prepare a Supplemental Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Environmental Supplemental Environmental Impact Statement for the Programmatic Environmental Impact Statement EIS-0236: Notice of Intent to Prepare a Supplemental Environmental Impact Statement for the Programmatic Environmental Impact Statement Stockpile Stewardship and Management The Department of Energy (DOE) is announcing a revised schedule for its preparation of a Draft Supplemental Environmental Impact Statement (SEIS) for the National Ignition Facility portion (Volume III, Appendix I) of the Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (DOE/EIS-0236; September, 1997). EIS-0236, Notice of Intent to prepare Supplemental Environmental Impact Statement for the Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (August 1999)

350

Scheduling workloads in a network of datacentres to reduce electricity cost and carbon footprint  

Science Journals Connector (OSTI)

Abstract This paper quantifies the extent to which the scheduling of workloads among a network of datacenters can reduce both electricity cost and carbon footprint. Based upon empirical data from California, Alberta and Ontario, it develops an optimization model that quantifies the savings in relation to the price of carbon on carbon markets and in carbon taxes. Combining the electricity cost with the carbon footprint using the price of carbon, results indicate a simultaneous saving of both 8.09% of electricity cost and 11.25% of carbon footprint, when jobs are scheduled in the current time-period. When jobs can be scheduled in future time-periods, a simultaneous saving of both 51.44% of electricity cost and 13.14% of carbon footprint was obtained. These results are shown to be robust with respect to variations in the price of carbon in taxes and markets in the European Emissions Trading System, Australia, British Columbia, California, and Japan, apart from exceptional periods when the carbon price was very low. The paper shows how a cloud operator can demonstrate that these savings are additional to business as usual so as to sell carbon credits on a carbon market, and indicates the standards available for certifying and auditing those emissions reductions.

Trung Le; David Wright

2014-01-01T23:59:59.000Z

351

Solar Decathlon 2005 Daily Event Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

DAILY EVENT SCHEDULE DAILY EVENT SCHEDULE Last updated on September 30, 2005 Note: This schedule is not part of the official Rules and Regulations and is subject to change at any time. Weds, Sept 28 12:00 AM 12:30 AM 1:00 AM 1:30 AM 2:00 AM 2:30 AM 3:00 AM 3:30 AM 4:00 AM 4:30 AM 5:00 AM 5:30 AM 6:00 AM 6:30 AM 7:00 AM 7:30 AM 8:00 AM 8:30 AM 9:00 AM 9:30 AM 10:00 AM 10:30 AM 11:00 AM 11:30 AM 12:00 PM 12:30 PM 1:00 PM 1:30 PM 2:00 PM 2:30 PM 3:00 PM 3:30 PM 4:00 PM 4:30 PM 5:00 PM 5:30 PM 6:00 PM 6:30 PM 7:00 PM 7:30 PM 8:00 PM 8:30 PM 9:00 PM 9:30 PM 10:00 PM 10:30 PM 11:00 PM 11:30 PM Registration Forrestal Bldg (DOE) Cafeteria National Mall Team/Organizer meeting and Safety Orientation Thurs, Sept 29 12:00 AM 12:30 AM 1:00 AM 1:30 AM 2:00 AM 2:30 AM 3:00 AM 3:30 AM 4:00 AM 4:30 AM 5:00 AM 5:30 AM 6:00 AM 6:30 AM 7:00

352

SOCO-1-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule Area: AMEA, Unaffil AL Munis and Coops, Hampton, East Miss., SMEPA off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted and scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F.

353

NC-1-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NC-1-B Wholesale Power Rate Schedule NC-1-B Wholesale Power Rate Schedule NC-1-B Wholesale Power Rate Schedule Area: Virginia Power/CP&L System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to a contract between the Government and Virginia Electric and Power Company (hereinafter called the Virginia Power) and PJM Interconnection LLC (hereinafter called PJM), scheduled pursuant to a contract between the Government and Carolina Power & Light Company (hereinafter called CP&L), and billed pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale of power

354

VA-4-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-B Wholesale Power Rate Schedule 4-B Wholesale Power Rate Schedule VA-4-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina served through the transmission facilities of Virginia Electric and Power Company (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download VA-4-B Rate Schedule More Documents & Publications

355

Descriptions of Task Order Schedules and Placement of Pricing Information  

NLE Websites -- All DOE Office Websites (Extended Search)

RFP DE-RP36-06GO96031 RFP DE-RP36-06GO96031 10/11/2007 ATTACHMENT J-5 DESCRIPTIONS OF TASK ORDER SCHEDULES AND PLACEMENT OF PRICING INFORMATION J-5.1 DESCRIPTIONS OF TASK ORDER (TO) SCHEDULES (SCHEDULE TEMPLATES ARE PROVIDED IN ATTACHMENT J-6) J-5.1.1 Schedule TO-1 (Preliminary Assessment - PA) - Proposed Guaranteed Cost Savings and Contractor Payments - Schedule TO-1 (PA) shall be submitted to present the contractor's estimated cost savings, proposed guaranteed cost savings, and contractor payments. TO-1 (PA) values submitted may be in estimated ranges. Based on the preliminary survey and agency discussions, the contractor shall submit a completed Schedule TO-1 (PA) containing: A. Column (a) - Contractor submits proposed estimated cost savings during the implementation period, prior to full project acceptance (see most recent version

356

MISS-1-N Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MISS-1-N Wholesale Power Rate Schedule MISS-1-N Wholesale Power Rate Schedule MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association System: Georgia-Alabama-South Carolina This rate schedule shall be available to the South Mississippi Electric Power Association (hereinafter called the Customer) to whom power may be wheeled pursuant to contracts between the Government and PowerSouth Energy Cooperative (hereinafter called PowerSouth). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

357

SOCO-3-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule SOCO-3-E Wholesale Power Rate Schedule Area: MEAG, Dalton System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects (hereinafter referred to collectively as the Projects) and sold under appropriate contracts between

358

AP-4-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-B Wholesale Power Rate Schedule 4-B Wholesale Power Rate Schedule AP-4-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia served through the facilities of American Electric Power Service Corporation (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download AP-4-B Rate Schedule More Documents & Publications

359

Replacement-2-A Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-A Wholesale Power Rate Schedule 2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale Power Rate Schedule Area: Replacement Energy System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom power is provided pursuant to contracts between the Government and the customer from the John H. Kerr and Philpott Projects (or Kerr-Philpott System). This rate schedule shall be applicable to the sale of wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer. Document Available for Download Replacement-2-A Rate Schedule More Documents & Publications Southeastern Power Administration 2010 Annual Report

360

AP-3-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-B Wholesale Power Rate Schedule 3-B Wholesale Power Rate Schedule AP-3-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Santee-4-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule Santee-4-E Wholesale Power Rate Schedule Area: Santee-Cooper System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina served through the transmission facilities of South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does not apply to energy from pumping operations at the Carters and Richard B.

362

Descriptions of Task Order Schedules and Placement of Pricing Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RFP DE-RP36-06GO96031 RFP DE-RP36-06GO96031 10/11/2007 ATTACHMENT J-5 DESCRIPTIONS OF TASK ORDER SCHEDULES AND PLACEMENT OF PRICING INFORMATION J-5.1 DESCRIPTIONS OF TASK ORDER (TO) SCHEDULES (SCHEDULE TEMPLATES ARE PROVIDED IN ATTACHMENT J-6) J-5.1.1 Schedule TO-1 (Preliminary Assessment - PA) - Proposed Guaranteed Cost Savings and Contractor Payments - Schedule TO-1 (PA) shall be submitted to present the contractor's estimated cost savings, proposed guaranteed cost savings, and contractor payments. TO-1 (PA) values submitted may be in estimated ranges. Based on the preliminary survey and agency discussions, the contractor shall submit a completed Schedule TO-1 (PA) containing: A. Column (a) - Contractor submits proposed estimated cost savings during the implementation period, prior to full project acceptance (see most recent version

363

Duke-3-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be scheduled pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer.

364

Duke-2-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. The Customer is responsible for providing a scheduling arrangement with the Government. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate

365

Santee-2-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule Santee-2-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be wheeled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

366

SOCO-1-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SOCO-1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule Area: AMEA, Unaffil AL Munis and Coops, Hampton, East Miss., SMEPA off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted and scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F.

367

AP-1-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-B Wholesale Power Rate Schedule 1-B Wholesale Power Rate Schedule AP-1-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted and scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer.

368

CTVI-1-A Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CTVI-1-A Wholesale Power Rate Schedule CTVI-1-A Wholesale Power Rate Schedule CTVI-1-A Wholesale Power Rate Schedule Area: Former customers of TVA System: Cumberland This rate schedule shall be available to customers (hereinafter called the Customer) who are or were formerly in the Tennessee Valley Authority (hereinafter called TVA) service area. This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and the Customer. Document Available for Download CTVI-1-A Rate Schedule More Documents & Publications

369

APS Long Range Operations Schedule FY2010  

NLE Websites -- All DOE Office Websites (Extended Search)

10) 10) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2009-3 2010-1 2010-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

370

APS Long Range Operations Schedule FY2009  

NLE Websites -- All DOE Office Websites (Extended Search)

09) 09) Alternate Formats: iCal | Excel | PDF APS Long Range Operation Schedule (FY2009) 2008-3 2009-1 2009-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

371

New Continuous-Time Scheduling Formulation for Continuous Plants under Variable Electricity Cost  

Science Journals Connector (OSTI)

Equation 21 is a big-M constraint that is only active if there is a continuous task being executed that belongs to energy cost level e. ... Due to the differences in electricity price among the energy cost levels, assigning production to the cheapest levels will have the biggest impact on the total cost. ... While accurate values are obviously dependent on problem data, particularly on the different cost levels agreed with the electricity provider, and on the scheduling practice at the plant, results have shown potential cost savings around 20%. ...

Pedro M. Castro; Iiro Harjunkoski; Ignacio E. Grossmann

2009-06-16T23:59:59.000Z

372

Water pollution Control Permit Fee Schedules (West Virginia) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

pollution Control Permit Fee Schedules (West Virginia) pollution Control Permit Fee Schedules (West Virginia) Water pollution Control Permit Fee Schedules (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Fees Siting and Permitting Provider Department of Environmental Protection This rule establishes schedules of permit application fees and annual permit fees for state water pollution control permits and national

373

MIT Plasma Science & Fusion left: research>alctor>meetings scheduled  

NLE Websites -- All DOE Office Websites (Extended Search)

of larger Directory of Plasma Conferences list with some additions (see also the Nuclear Fusion calendar). ITPA meetings schedule Fusion meetings calendars Conference, Workshop,...

374

Simulation Optimization for the Stochastic Economic Lot Scheduling ...  

E-Print Network (OSTI)

constant functions as well as control policies that can be described by a small set ... We address the problem of scheduling production of multiple products on a...

2012-01-12T23:59:59.000Z

375

Simulation Optimization for the Stochastic Economic Lot Scheduling ...  

E-Print Network (OSTI)

The integration of lot-sizing, scheduling and safety stock planning is a major challenge in multi- product inventory .... Generic policy search for production control.

2014-03-31T23:59:59.000Z

376

Scheduling co-operating stacking cranes with predetermined ...  

E-Print Network (OSTI)

Nov 7, 2011 ... Crane scheduling in container terminals is known as a difficult optimization problem .... an overview focussing on design and control issues.

2011-11-19T23:59:59.000Z

377

Oversight Scheduling and Operational Awareness at the Savannah...  

Office of Environmental Management (EM)

Office of Safety and Emergency Management Evaluations Activity Report on Oversight Scheduling and Operational Awareness at the Savannah River Site Dates of Activity : 0325...

378

Optimization Online - Fast Approximations for Online Scheduling of ...  

E-Print Network (OSTI)

Jun 19, 2014 ... Fast Approximations for Online Scheduling of Outpatient Procedure Centers. Berg(bberg2 ***at*** gmu.edu) Denton(btdenton ***at***...

Berg

2014-06-19T23:59:59.000Z

379

FLEX TIME (ALTERNATIVE WORK SCHEDULE) REQUEST EMPLOYEE INFORMATION  

E-Print Network (OSTI)

(Hours) Proposed Alternative Work Schedule (Hours) Days On-Site Off-Site On-Site Off-Site Monday Tuesday

Dasgupta, Dipankar

380

National Labs Commission Phase I Public Schedule | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Labs Commission Phase I Public Schedule More Documents & Publications Hydrogen Generator Appliance Natural Gas and Hydrogen Infrastructure Opportunities Workshop Agenda...

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Single-Machine Two-Agent Scheduling Problems with ...  

E-Print Network (OSTI)

Jan 24, 2014 ... Abstract: We address a class of deterministic scheduling problems in which two agents compete for the usage of a single machine. The agents...

Gaia Nicosia

2014-01-24T23:59:59.000Z

382

A hybrid Lagrangean metaheuristic for single machine scheduling ...  

E-Print Network (OSTI)

Aug 8, 2014 ... A hybrid Lagrangean metaheuristic for single machine scheduling problem with sequence-dependent setup times and due dates.

Thiago Henrique Nogueira

2014-08-08T23:59:59.000Z

383

Parallel machine match-up scheduling with manufacturing cost considerations  

E-Print Network (OSTI)

decisions on parallel CNC machines: -constraint approach.bounding mechanism for the CNC machine scheduling problemsprocessing times is the CNC turning operation where

Aktrk, M. Selim; Atamtrk, Alper; Grel, Sinan

2010-01-01T23:59:59.000Z

384

ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: PROCUREMENT, SUPPLY, AND GRANT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS The basic procurement files reflect a considerable range of...

385

Flow Shop Scheduling with Peak Power Consumption Constraints  

E-Print Network (OSTI)

To conduct our experiments, we considered a hypothetical flow shop scheduling ... There are two types of machines with different operations: face milling. 16...

2012-09-23T23:59:59.000Z

386

Stochastic flow shop scheduling model for the Panama Canal.  

E-Print Network (OSTI)

??The Panama Canal can be modeled as a stochastic flexible flow shop for the purpose of scheduling. A metaheuristic stochastic optimization method (Nested Partition) was (more)

de Castillo, Zoila Yadira Guerra

2006-01-01T23:59:59.000Z

387

Optimization Online - Stochastic Real-Time Scheduling of Wind ...  

E-Print Network (OSTI)

Jan 3, 2015 ... Stochastic Real-Time Scheduling of Wind-thermal Generation Units in ... Keywords: conditional value at risk, uncertainty modeling, wind energy.

Alireza Soroudi

2015-01-03T23:59:59.000Z

388

ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: PAYROLL AND PAY ADMINISTRATION RECORDS ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS Payrolling and pay administration records pertain to the...

389

ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: PAYROLL AND PAY ADMINISTRATION RECORDS-Revision 2 ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS-Revision 2 Payrolling and pay administration records...

390

APS Long Range Schedule FY1997  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Beamline Operations Schedule 7 Beamline Operations Schedule January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 6 7 8 9 10 11 12 00:00-08:00 MS MS UO UO UO UO UO 08:00-16:00 MS UO UO UO SV UO UO 16:00-24:00 MS UO UO UO UO UO UO 13 14 15 16 17 18 19 00:00-08:00 UO UO UO UO UO MS MS 08:00-16:00 UO SV SV Contingency UO MS MS MS 16:00-24:00 UO UO UO UO MS MS MS 20 21 22 23 24 25 26 00:00-08:00 MS UO UO UO UO UO MS 08:00-16:00 UO UO SV Contingency UO UO MS MS 16:00-24:00 UO UO UO UO UO MS MS 27 28 29 30 31 1 2 00:00-08:00 MS SM SM SM SM SM SM 08:00-16:00 MS SM SM SM SM SM SM 16:00-24:00 MS SM SM SM SM SM SM FEB Monday Tuesday Wednesday Thursday Friday Saturday Sunday

391

APS Long Range Schedule FY1998  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Beamline Operations Schedule 8 Beamline Operations Schedule JAN Monday Tuesday Wednesday Thursday Friday Saturday Sunday Week 1 5 6 7 8 9 10 11 0000 - 0800 SM SM SM MS MS MS MS 0800 - 1600 SM SM* MS MS MS MS MS 1600 - 2400 SM SM MS MS MS MS MS Week 2 12 13 14 15 16 17 18 0000 - 0800 MS MS UO UO UO UO UO 0800 - 1600 MS* UO UO UO UO UO UO 1600 - 2400 MS UO UO UO UO UO UO Week 3 19 20 21 22 23 24 25 0000 - 0800 UO MS UO UO UO UO UO 0800 - 1600 MS UO UO UO UO UO UO 1600 - 2400 MS UO UO UO UO UO UO JAN/FEB 26 27 28 29 30 31 1 0000 - 0800 UO MS UO UO UO UO UO 0800 - 1600 MS SOM UO UO UO UO UO 1600 - 2400 MS UO UO UO UO UO UO Week 5 2 3 4 5 6 7 8 0000 - 0800 UO MS UO UO UO UO UO

392

APS Long Range Schedule FY1999  

NLE Websites -- All DOE Office Websites (Extended Search)

9 Beamline Operations Schedule 9 Beamline Operations Schedule JAN Monday Tuesday Wednesday Thursday Friday Saturday Sunday Week 1 18 19 20 21 22 23 24 0000 - 0800 MS MS MS MS UO UO UO 0800 - 1600 MS MS MS UO UO UO UO 1600 - 2400 MS MS MS UO UO UO UO Week 2 25 26 27 28 29 30 31 0000 - 0800 UO UO UO UO UO UO UO 0800 - 1600 UO MS UO UO UO UO UO 1600 - 2400 UO UO UO UO UO UO UO FEB 1 2 3 4 5 6 7 0000 - 0800 UO MS MS UO UO UO UO 0800 - 1600 MS MS UO UO UO UO UO 1600 - 2400 MS MS UO UO UO UO UO Week 4 8 9 10 11 12 13 14 0000 - 0800 UO UO UO UO UO UO UO 0800 - 1600 UO MS UO UO* UO UO UO 1600 - 2400 UO UO UO UO UO UO UO Week 5 15 16 17 18 19 20 21 0000 - 0800 UO MS MS UO UO U O UO

393

APS Long Range Schedule FY1996  

NLE Websites -- All DOE Office Websites (Extended Search)

Long Range Commissioning Schedule for FY1996 Long Range Commissioning Schedule for FY1996 Date First Shift 0:00-8:00 Second Shift 8:00-16:00 Third Shift 16:00-24:00 3/15/96 SR Studies 1-ID-A Shielding Verification SR Studies 3/23/96 SR Studies 3-ID-A , 2-ID-A , 3-ID-B Shielding Verifications User Beam 3/24/96 User Beam User Beam User Beam 3/25/96 User Beam 19-ID-A Shielding Verification User Beam 3/26/96 User Beam 2-ID-A , 12-BM-A Shielding Verifications User Beam 3/27/96 User Beam 5-BM-A Shielding Verification User Beam 3/28/96 User Beam 19-ID-C Shielding Verification User Beam until 20:00 3/29/96 SR Studies SR Studies SR Studies 3/30/96 SR Studies SR Studies SR Studies 3/31/96 SR Studies SR Studies SR Studies 4/1/96 SR Studies SR Studies SR Studies 4/2/96 SR Studies 5-BM-B Shielding Verification User Beam

394

Hanford Site Environmental Surveillance Master Sampling Schedule  

SciTech Connect

Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, ''General Environmental protection Program,'' and DOE Order 5400.5, ''Radiation Protection of the Public and the Environment.'' The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY1999 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes the sampling location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be collected in 1999 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing approximate sampling locations.

LE Bisping

1999-02-12T23:59:59.000Z

395

Weekly Natural Gas Storage Report Schedule  

U.S. Energy Information Administration (EIA) Indexed Site

‹ Weekly Natural Gas Storage Report ‹ Weekly Natural Gas Storage Report Weekly Natural Gas Storage Report Schedule Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Thursdays with the following exceptions. All times are Eastern. Alternate Release Date Release Day Release Time Holiday 7/6/2012 Friday 10:30 a.m. 7/4/2012 (Wednesday) is Independence Day 11/21/2012 Wednesday 12:00 p.m. 11/22/2012 (Thursday) is Thanksgiving Day 12/28/2012 Friday 10:30 a.m. 12/25/2012 (Tuesday) is Christmas Day 1/4/2013 Friday 10:30 a.m. 1/1/2013 (Tuesday) is New Year's Day 7/3/2013 Wednesday 12:00 p.m. 7/4/2013 (Thursday) is Independence Day 10/22/2013 Tuesday 10:30 a.m. EIA Closed 11/27/2013 Wednesday 12:00 p.m. 11/28/2013 (Thursday) is Thanksgiving Day

396

Cost reduction ideas for LNG terminals  

SciTech Connect

LNG projects are highly capital intensive and this has long been regarded as being inevitable. However, recent developments are forcing the LNG industry to aggressively seek cost reductions. For example, the gas-to-liquids (GTL) process is increasingly seen as a potential rival technology and is often being touted as an economically superior alternative fuel source. Another strong driving force behind needed cost reductions is the low crude oil price which seems to have settled in the $10--13/bb. range. LNG is well positioned as the fuel of choice for environmentally friendly new power projects. As a result of the projected demand for power especially in the Pacific Rim countries several LNG terminal projects are under consideration. Such projects will require a new generation of LNG terminal designs emphasizing low cost, small scale and safe and fully integrated designs from LNG supply to power generation. The integration of the LNG terminal with the combined cycle gas turbine (CCGT) power plant offers substantial cost savings opportunities for both plants. Various cost reduction strategies and their impact on the terminal design are discussed including cost reduction due to integration.

Habibullah, A.; Weldin, F.

1999-07-01T23:59:59.000Z

397

Report: Technical Uncertainty and Risk Reduction  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TECHNICAL UNCERTAINTY AND RISK REDUCTION TECHNICAL UNCERTAINTY AND RISK REDUCTION Background In FY 2007 EMAB was tasked to assess EM's ability to reduce risk and technical uncertainty. Board members explored this topic throughout the year as a component of their focus on the previously discussed topic of Discretionary Budgeting. Discussion Understanding the risks and variability associated with EM's projects is a challenging task that has the potential to significantly impact the program's established baselines. According to budget personnel, EM has established a database of baseline variables and possibilities; however, this tool is project-specific and does not apply to the greater complex. The Board believes that EM could benefit from incorporating an additional and more comprehensive data point into the baseline development process that budgets

398

2007 Solar Decathlon Detailed Event Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

DETAILED EVENT SCHEDULE DETAILED EVENT SCHEDULE Last updated on September 14, 2007 Note: This schedule is subject to change at any time. 12:00 AM 12:30 AM 1:00 AM 1:30 AM 2:00 AM 2:30 AM 3:00 AM 3:30 AM 4:00 AM 4:30 AM 5:00 AM 5:30 AM 6:00 AM 6:30 AM 7:00 AM 7:30 AM 8:00 AM 8:30 AM 9:00 AM 9:30 AM 10:00 AM 10:30 AM 11:00 AM 11:30 AM 12:00 PM 12:30 PM 1:00 PM 1:30 PM 2:00 PM 2:30 PM 3:00 PM 3:30 PM 4:00 PM 4:30 PM 5:00 PM 5:30 PM 6:00 PM 6:30 PM 7:00 PM 7:30 PM 8:00 PM 8:30 PM 9:00 PM 9:30 PM 10:00 PM 10:30 PM 11:00 PM 11:30 PM 12:00 AM 12:30 AM 1:00 AM 1:30 AM 2:00 AM 2:30 AM 3:00 AM 3:30 AM 4:00 AM 4:30 AM 5:00 AM 5:30 AM 6:00 AM 6:30 AM 7:00 AM 7:30 AM 8:00 AM 8:30 AM 9:00 AM 9:30 AM 10:00 AM 10:30 AM 11:00 AM 11:30 AM 12:00 PM 12:30 PM 1:00 PM 1:30 PM 2:00 PM 2:30 PM 3:00 PM 3:30 PM 4:00 PM 4:30 PM 5:00 PM 5:30 PM 6:00 PM 6:30 PM 7:00 PM 7:30 PM 8:00

399

Module 4Module 4 CPU SchedulingCPU Scheduling Reading: Chapter 5Reading: Chapter 5Reading: Chapter 5Reading: Chapter 5  

E-Print Network (OSTI)

to execute, and then give the control to it If we want efficient resource utilization, we need CPU scheduling preemptive scheduling? DispatcherDispatcher Dispatcher module gives control of the CPU to the process1 Module 4Module 4 ­­ CPU SchedulingCPU Scheduling Reading: Chapter 5Reading: Chapter 5Reading

Stojmenovic, Ivan

400

: A Testbed for Empirically Comparing Real-Time Multiprocessor Schedulers  

E-Print Network (OSTI)

on M processors any pe- riodic task system with total utilization at most M [2], and the global-deadline-first (EDF) scheduling, pre- emptive and nonpreemptive global EDF scheduling, and two variants of the global-real-time constraints. To our knowledge, this paper is the first attempt by anyone to compare partitioned and global

Anderson, James

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

ORIE 6335: THE DESIGN & ANALYSIS OF SCHEDULING ALGORITHMS Spring 2009  

E-Print Network (OSTI)

of algorithms will be very useful. Course Requirements: There will be four to five problem sets; the last one. This course will cover the basic techniques in the design of efficient algorithms for scheduling problemsORIE 6335: THE DESIGN & ANALYSIS OF SCHEDULING ALGORITHMS Spring 2009 Instructor: David Shmoys

Keinan, Alon

402

Polynomial Time Algorithms for Minimum Energy Scheduling Philippe Baptiste1  

E-Print Network (OSTI)

algorithm for computing the minimum energy schedule when all jobs have unit length. 1 Introduction PowerPolynomial Time Algorithms for Minimum Energy Scheduling Philippe Baptiste1 , Marek Chrobak2 policies is to reduce the amount of energy consumed by computer systems while maintaining satisfactory

Chrobak, Marek

403

Optimizing Throughput and Energy in Online Deadline Scheduling  

E-Print Network (OSTI)

of all jobs. An optimal schedule is expected to maximize the throughput, and furthermore, its energy a scheduling algorithm, one has to face the dilemma of selecting more jobs and being conservative in energy jobs; O(1)-competitive online algorithms with respect to energy usage have been known [Yao et al. 1995

Wong, Prudence W.H.

404

Physics & Astronomy Open House Schedule UH Manoa Watanabe Hall  

E-Print Network (OSTI)

Physics & Astronomy Open House Schedule UH Manoa Watanabe Hall 22 November 2014 0830 - 1245 *** Physics & Astronomy info. available at www.phys.hawaii.edu *** Welcome & Overview: Prof. Pui Lam in Physical Science 217 at 0830 ** schedules for groups 1 to 10 below for 0900-1100 ** **solar observing

405

A behavior priority driven approach for resource reservation scheduling  

Science Journals Connector (OSTI)

In this paper a behavioral distinction of soft real-time tasks is introduced. The distinction is based on the behavior of the previous instance of each task and it is used to propose a scheduling algorithm. The algorithm, called BIDS, uses well-known ... Keywords: behavior, importance, real-time, scheduling, server

Leo Ordnez; David Donari; Rodrigo Santos

2008-03-01T23:59:59.000Z

406

Coordinated Hospital Patient Scheduling Keith Decker and Jinjiang Li  

E-Print Network (OSTI)

Coordinated Hospital Patient Scheduling Keith Decker and Jinjiang Li Department of Computer and Information Sciences University of Delaware (decker,jli)@cis.udel.edu Abstract Hospital Patient Scheduling is an inherently distributed problem because of the way real hospitals are organized. As medical procedures have

Decker, Keith S.

407

Single Machine Scheduling with a Non-renewable Financial Resource  

E-Print Network (OSTI)

Single Machine Scheduling with a Non-renewable Financial Resource Evgeny R. Gafarov a , Alexander A with a non-renewable resource. For example, money or fuel provide natural examples of such a non-renewable resource. Such problems with a non-renewable resource are also referred to as financial scheduling problems

Magdeburg, Universität

408

Incentivizing Advanced Load Scheduling in Smart Homes , and David Irwin  

E-Print Network (OSTI)

Incentivizing Advanced Load Scheduling in Smart Homes Ye Xu , and David Irwin , and Prashant Shenoy Department of Electrical and Computer Engineering School of Computer Science University of Massachusetts Amherst ABSTRACT In recent years, researchers have proposed numerous advanced load scheduling algorithms

Massachusetts at Amherst, University of

409

Iterative improvement to solve the parcel hub scheduling problem  

Science Journals Connector (OSTI)

This paper presents iterative improvement algorithms to solve the parcel hub scheduling problem (PHSP). The PHSP is combinatorial optimization problem that consists of scheduling a set of inbound trailers to a small number of unload docks. At the unload ... Keywords: Cross docks, Genetic algorithms, Local search, Parcel delivery industry, Simulated annealing

Douglas L. McWilliams

2010-08-01T23:59:59.000Z

410

POWER SCHEDULING IN A HYDROTHERMAL SYSTEM UNDER UNCERTAINTY  

E-Print Network (OSTI)

de­ composition. Numerical results are re­ ported for realistic data from a German power utility. Keywords: Power scheduling, uncertain elec­ trical load, stochastic Lagrangian decomposi­ tion, scenarioPOWER SCHEDULING IN A HYDRO­THERMAL SYSTEM UNDER UNCERTAINTY C.C. Carøe 1 , M.P. Nowak 2 , W. R

Römisch, Werner

411

A Meeting Scheduling System Based on Open Constraint Programming  

E-Print Network (OSTI)

- ences can be programmed using the OCP reactors language. CLP is suitable to be used in meetingA Meeting Scheduling System Based on Open Constraint Programming Kenny Qili Zhu and Andrew E a meeting scheduling system based on open constraint programming (OCP) paradigm. OCP is an extension

Zhu, Kenny Q.

412

Queue Prediction: an efficient scheduler for fast ATM cell transmission  

E-Print Network (OSTI)

Queue Prediction: an efficient scheduler for fast ATM cell transmission Peter Fenwick Department, if not impossible within the time constraints of fast ATM transmission (622 Mbps or higher). This paper presents a solution to this problem. By scheduling in advance the transmissions from queues it allows all output

Fenwick, Peter

413

GreenSlot: Scheduling Energy Consumption in Green Datacenters  

E-Print Network (OSTI)

GreenSlot: Scheduling Energy Consumption in Green Datacenters Íñigo Goiri UPC/BSC and Rutgers Univ grid (as a backup). GreenSlot predicts the amount of solar energy that will be available in the near future, and schedules the workload to maximize the green energy consumption while meet- ing the jobs

414

Renewable Energy Scheduling for Fading Channels with Maximum Power Constraint  

E-Print Network (OSTI)

Renewable Energy Scheduling for Fading Channels with Maximum Power Constraint Zhe Wang Electrical--In this paper, we develop efficient algorithm to obtain the optimal energy schedule for fading channel with energy harvesting. We assume that the side information of both the channel states and energy harvesting

Greenberg, Albert

415

Smooth Inequalities and Equilibrium Inefficiency in Scheduling Games  

E-Print Network (OSTI)

, that permits to bal- ance overall quality of service and fairness. Our goal is to design schedul- ing policies that schedules the jobs non-preemptively in order of increasing processing times. We show that the price on Internet and Network Economics (WINE 2012), Liverpool : United Kingdom (2012)" DOI : 10

Paris-Sud XI, Université de

416

Economics of Grade Reduction  

E-Print Network (OSTI)

the following abbreviations are used:* C25 diameter in inches of high pressure cylinder. c= diameter in inches of low pressure cylinder. P= boiler pressure. R}= ratio of mean effective pressure to boiler pressure in low pressure cylinder, taken from Pig. E.... But the only error of moment in such case will be in the es- timated saving in train mileage, for the same degree of efficiency or inefficiency is to be expected after the reduction of grade as before. As the estimated saving per train mile as given...

Neff, Paul J.

1914-02-10T23:59:59.000Z

417

Expanding Your Horizons scheduled for March 2  

NLE Websites -- All DOE Office Websites (Extended Search)

Expanding Your Horizons Expanding Your Horizons Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit Expanding Your Horizons scheduled for March 2 The conference offers fifth- to 12th-grade girls opportunities to participate in hands-on workshops about science, technology, engineering, math and related fields. February 1, 2013 dummy image Read our archives. Contacts Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email Up to 250 young women are expected to participate in the workshops that will include subjects such as computers and robots, veterinary medicine, cryptography and ocean science. This year the Santa Fe and Los Alamos Expanding Your Horizons (EYH) conferences are combined into one, all-day session to be held on March 2 at

418

DOE HQ Shuttle Bus Schedule and Route | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE HQ Shuttle Bus Schedule and Route DOE HQ Shuttle Bus Schedule and Route DOE HQ Shuttle Bus Schedule and Route The DOE Shuttle Buses follow the same schedules between the two main Headquarters locations, Forrestal and Germantown. The buses start their routes at each Headquarters facility at the same times, see the schedule below. The subsequent stops at the other facilities are relative to the departure time of each route. Headquarters employees are reminded of the statutory provisions that authorize and limit the use of the shuttle bus service. Specific authority for the use of appropriated funds to pay for transportation for official purposes is contained in section 1344(a)(1) of Title 31, U.S. Code. Use of this transportation for any other purpose is inappropriate and against the law.

419

AP-2-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-B Wholesale Power Rate Schedule 2-B Wholesale Power Rate Schedule AP-2-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer. Document Available for Download

420

SOCO-2-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule SOCO-2-E Wholesale Power Rate Schedule Area: PowerSouth Off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

SOCO-4-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule SOCO-4-E Wholesale Power Rate Schedule Area: OPC System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida served through the transmission facilities of Southern Company Services, Inc. (hereinafter called the Company) or the Georgia Integrated Transmission System. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects (hereinafter referred to collectively as the Projects) and sold under appropriate contracts between

422

CM-1-H Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule October 1, 2011 - 3:22pm Addthis Availability: This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency (hereinafter called the Customers). Applicability: This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Character of Service: The electric capacity and energy supplied hereunder will be three phase

423

Department Sets Aggressive Schedule for New Appliance Standards |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sets Aggressive Schedule for New Appliance Standards Sets Aggressive Schedule for New Appliance Standards Department Sets Aggressive Schedule for New Appliance Standards February 1, 2006 - 8:52am Addthis WASHINGTON, DC - The Department of Energy (DOE) today released a schedule for setting new appliance efficiency standards. The five-year plan outlines how DOE will work with all of its partners to address the appliance standards rulemaking backlog and meet all of the statutory requirements established in the Energy Policy and Conservation Act and the Energy Policy Act of 2005 (EPACT 2005). "Improved efficiency saves Americans money and energy," said Acting Assistant Secretary for Energy Efficiency and Renewable Energy, Douglas L. Faulkner. "This aggressive schedule shows our commitment to greater

424

Balancing Authority Cooperation Concepts - Intra-Hour Scheduling  

SciTech Connect

The overall objective of this study was to understand, on an Interconnection-wide basis, the effects intra-hour scheduling compared to hourly scheduling. Moreover, the study sought to understand how the benefits of intra-hour scheduling would change by altering the input assumptions in different scenarios. This report describes results of three separate scenarios with differing key assumptions and comparing the production costs between hourly scheduling and 10-minute scheduling performance. The different scenarios were chosen to provide insight into how the estimated benefits might change by altering input assumptions. Several key assumptions were different in the three scenarios, however most assumptions were similar and/or unchanged among the scenarios.

Hunsaker, Matthew; Samaan, Nader; Milligan, Michael; Guo, Tao; Liu, Guangjuan; Toolson, Jacob

2013-03-29T23:59:59.000Z

425

Department Sets Aggressive Schedule for New Appliance Standards |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department Sets Aggressive Schedule for New Appliance Standards Department Sets Aggressive Schedule for New Appliance Standards Department Sets Aggressive Schedule for New Appliance Standards February 1, 2006 - 8:52am Addthis WASHINGTON, DC - The Department of Energy (DOE) today released a schedule for setting new appliance efficiency standards. The five-year plan outlines how DOE will work with all of its partners to address the appliance standards rulemaking backlog and meet all of the statutory requirements established in the Energy Policy and Conservation Act and the Energy Policy Act of 2005 (EPACT 2005). "Improved efficiency saves Americans money and energy," said Acting Assistant Secretary for Energy Efficiency and Renewable Energy, Douglas L. Faulkner. "This aggressive schedule shows our commitment to greater

426

DEPARTMENT OF ENERGY RESEARCH AND DEVELOPMENT RECORDS SCHEDULE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13 13 DEPARTMENT OF ENERGY RESEARCH AND DEVELOPMENT RECORDS SCHEDULE N1-434-96-9, N1-434-07-01, and N1-434-08-02 Revision 2 June 2008 Scope. This schedule encompasses research and development (R&D) records generated within the Department of Energy (DOE) complex, which consists of all DOE offices and its contractor organizations, such as the National Laboratories. It applies to all applicable records regardless of media or format, including paper, audio and visual, and electronic records. Excluded from this schedule are R&D records pertaining to (a) nuclear weapons, which are covered by DOE Nuclear Weapons Schedule (NI-434-96-5 and N1-434-98- 27), and (b) Work for Others, Cooperative Research and Development Agreements (CRADA), and cost sharing agreements, which are covered by DOE Schedule N1-434-

427

VA-2-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-B Wholesale Power Rate Schedule 2-B Wholesale Power Rate Schedule VA-2-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer. Document Available for Download

428

Rate Schedule CV-T3 (Supersedes Schedules CV- T2) UNITED STATES DEPARTMENT OF ENERGY  

NLE Websites -- All DOE Office Websites (Extended Search)

T3 T3 (Supersedes Schedules CV- T2) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR POINT-TO-POINT TRANSMISSION SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Central Valley Project (CVP) firm and/or non-firm Point-to-Point (PTP) transmission service. Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points of

429

Achieving Queue-Length Stability Through Maximal Scheduling in Wireless Networks  

E-Print Network (OSTI)

stability region; however, these scheduling strategies also require centralized control. Although [5], [6Achieving Queue-Length Stability Through Maximal Scheduling in Wireless Networks Prasanna Chaporkar through distributed scheduling in wireless networks. We consider a simple, local information based

Sarkar, Saswati

430

Power Control and Transmission Scheduling for Network Utility Maximization in Wireless Networks  

E-Print Network (OSTI)

Power Control and Transmission Scheduling for Network Utility Maximization in Wireless Networks Min power control and transmis- sion scheduling problem in wireless networks with average power constraints. Index Terms--Network utility maximization, power control, transmission scheduling, column generation I

Sharma, Vinod

431

On Dynamic Scheduling of a Parallel Server System with Partial Pooling  

E-Print Network (OSTI)

proposed and refined by Harrison et al., we approximate the scheduling control problem for this parallel Scheduling of Parallel Servers. Keywords and phrases: Stochastic networks, dynamic control, resource pooling.3 Scheduling Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 3 Sequence

432

Maximising the net present value for resource-constrained project scheduling  

Science Journals Connector (OSTI)

The Resource-constrained Project Scheduling Problem (Rcpsp), in which a schedule must obey the resource constraints and the precedence constraints between pairs of activities, is one of the most studied scheduling problems. An important variation of ...

Andreas Schutt; Geoffrey Chu; Peter J. Stuckey; Mark G. Wallace

2012-05-01T23:59:59.000Z

433

Microgrid Scheduling for Reliable, Cost-Effective, and Environmentally Friendly Energy Management  

Science Journals Connector (OSTI)

The model provides optimal schedules with minimal cost or reduced environmental impacts, e.g., global warming potential, while satisfying the balance of electricity supply and demand. ... (15) The environmental impact function can be described by computing the total GWP from all electricity-generating sources as follows:(2)where RenewGWPj, FuelGWPi, BGWP, and NGWP denote the GWP imposed per unit of electricity from renewable source j, fuel source i, battery, and national grid, respectively; erenewj,t, and efueli,t denote electricity directly used from renewable source j and electricity generated from fuel i at time t, separately. ... Wind, solar, and MSW energies are the renewables in the system; the expected renewable energy can be either stored to the battery or used to satisfy the demand of local loads as in eq 13. ...

Jeremy Jie Ming Kwok; Nan Yu; Iftekhar A. Karimi; Dong-Yup Lee

2012-05-31T23:59:59.000Z

434

Reduction relations for monoid semirings  

Science Journals Connector (OSTI)

In this paper we study rewriting techniques for monoid semirings. Based on disjoint and non-disjoint representations of the elements of monoid semirings we define two different reduction relations. We prove that in both cases the reduction relation describes ... Keywords: Confluence, Congruence, Critical pair, Reduction relation, Rewriting system, Semiring, Termination

Friedrich Otto; Olga Sokratova

2004-03-01T23:59:59.000Z

435

RecycleMania! Improving Waste Reduction and Recycling on  

E-Print Network (OSTI)

RecycleMania! Improving Waste Reduction and Recycling on Campus from Universities to Big Business #12;Contact Information Tracy Artley Recycling Coordinator University of Michigan Tel: 734-763-5539 Email: recycle@umich.edu #12;Agenda Waste Impacts of Large Institutions Unique Challenges Overcoming

Awtar, Shorya

436

The Vessel Schedule Recovery Problem (VSRP) A MIP model for handling disruptions in liner shipping  

Science Journals Connector (OSTI)

Containerized transport by liner shipping companies is a multi billion dollar industry carrying a major part of the world trade between suppliers and customers. The liner shipping industry has come under stress in the last few years due to the economic crisis, increasing fuel costs, and capacity outgrowing demand. The push to reduce CO2 emissions and costs have increasingly committed liner shipping to slow-steaming policies. This increased focus on fuel consumption, has illuminated the huge impacts of operational disruptions in liner shipping on both costs and delayed cargo. Disruptions can occur due to adverse weather conditions, port contingencies, and many other issues. A common scenario for recovering a schedule is to either increase the speed at the cost of a significant increase in the fuel consumption or delaying cargo. Advanced recovery options might exist by swapping two port calls or even omitting one. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker consumption and the impact on cargo in the remaining network and the customer service level. It is proven that the VSRP is NP -hard. The model is applied to four real life cases from Maersk Line and results are achieved in less than 5seconds with solutions comparable or superior to those chosen by operations managers in real life. Cost savings of up to 58% may be achieved by the suggested solutions compared to realized recoveries of the real life cases.

Berit D. Brouer; Jakob Dirksen; David Pisinger; Christian E.M. Plum; Bo Vaaben

2013-01-01T23:59:59.000Z

437

Operating Experience Level 3, Industrial Equipment Impacts Infrastructure  

Energy.gov (U.S. Department of Energy (DOE))

This Operating Experience Level 3 (OE-3) document provides information on a safety concern related to heavy industrial equipment that contacts and damages structures and electrical, gas, and water lines. Although these contacts did not cause injuries, the events did impact mission and schedule, divert resources, and change momentum.

438

The Impact of Deregulation on Energy Conservation and DSM Measures  

E-Print Network (OSTI)

THE IMPACT OF DEREGULATION ON ENERGY CONSERVATION AND DSM MEASURES Michael W. Brasovan Project Director, Energy Procurement Carter & Burgess Ft. Worth, Texas ABSTRACT The regulated utility monopoly, with its defined and quasi.... THE IMPACT OF DEREGULATION ON ENERGY CONSERVATION AND DSM MEASURES In the past, determining the benefits of different electricity consumers? operating strategies or schedules was done by modeling the different scenarios on one or more of the electric...

Brasovan, M. W.

2002-01-01T23:59:59.000Z

439

Utility Sector Impacts of Reduced Electricity Demand  

SciTech Connect

This report presents a new approach to estimating the marginal utility sector impacts associated with electricity demand reductions. The method uses publicly available data and provides results in the form of time series of impact factors. The input data are taken from the Energy Information Agency's Annual Energy Outlook (AEO) projections of how the electric system might evolve in the reference case, and in a number of side cases that incorporate different effciency and other policy assumptions. The data published with the AEO are used to define quantitative relationships between demand-side electricity reductions by end use and supply-side changes to capacity by plant type, generation by fuel type and emissions of CO2, Hg, NOx and SO2. The impact factors define the change in each of these quantities per unit reduction in site electricity demand. We find that the relative variation in these impacts by end use is small, but the time variation can be significant.

Coughlin, Katie

2014-12-01T23:59:59.000Z

440

E-Print Network 3.0 - action scheduling tool Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Lab Collection: Computer Technologies and Information Sciences 62 DesigntoCriteria Scheduling: RealTime Agent Control ? Summary: or the Design-to-Criteria scheduler. The...

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

E-Print Network 3.0 - altered fractionation schedules Sample...  

NLE Websites -- All DOE Office Websites (Extended Search)

Sciences 18 Scheduling Space-Ground Communications for the Air Force Satellite Control Network Summary: Scheduling Space-Ground Communications for the Air Force...

442

E-Print Network 3.0 - appointments and schedules Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

students are required to schedule routine appoint-ments with their respective academic advisor. Summary: All EOFPEPCARR students are required to schedule routine appoint- ments...

443

E-Print Network 3.0 - aware packet scheduling Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

packets. Through simulation we show the improved performance of our scheduling algorithm... Flow N Scheduler Queues CPU Handler Packets Leaving Active Node Packets Entering...

444

PARS II End-of-Month Checklist and Processing Schedule | Department...  

Energy Savers (EERE)

and Processing Schedule PARS II End-of-Month Checklist and Processing Schedule Slide 1 More Documents & Publications Slide 1 PMCDPNewsletterOctober2010SHR.pdf October...

445

Potential Impacts of Reductions in Refinery Activity on Northeast...  

Gasoline and Diesel Fuel Update (EIA)

serving Philadelphia-area refineries primarily handle crude oil and their docks and tanks are not equipped to offload waterborne products. Figure 1. Petroleum Product Assets in...

446

Analysis of Potential Energy Saving and CO2 Emission Reduction of Home Appliances and Commercial Equipments in China  

SciTech Connect

China is now the world's largest producer and consumer of household appliances and commercial equipment. To address the growth of electricity use of the appliances, China has implemented a series of minimum energy performance standards (MEPS) for 30 appliances, and voluntary energy efficiency label for 40 products. Further, in 2005, China started a mandatory energy information label that covers 19 products to date. However, the impact of these standard and labeling programs and their savings potential has not been evaluated on a consistent basis. This research involved modeling to estimate the energy saving and CO{sub 2} emission reduction potential of the appliances standard and labeling program for products for which standards are currently in place, or under development and those proposed for development in 2010. Two scenarios that have been developed differ primarily in the pace and stringency of MEPS development. The 'Continued Improvement Scenario' (CIS) reflects the likely pace of post-2009 MEPS revisions, and the likely improvement at each revision step considering the technical limitation of the technology. The 'Best Practice Scenario' (BPS) examined the potential of an achievement of international best practice MEPS in 2014. This paper concludes that under the 'CIS' of regularly scheduled MEPS revisions to 2030, cumulative electricity consumption could be reduced by 9503 TWh, and annual CO{sub 2} emissions would be 16% lower than in the frozen efficiency scenario. Under a 'BPS' scenario for a subset of products, cumulative electricity savings would be 5450 TWh and annual CO{sub 2} emissions reduction would be 35% lower than in the frozen scenario.

Zhou, Nan; Fridley, David; McNeill, Michael; Zheng, Nina; Letschert, Virginie; Ke, Jing; Saheb, Yamina

2010-06-07T23:59:59.000Z

447

Global Threat Reduction Initiative  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nonproliferation Nonproliferation U.S. DEPARTMENT OF ENERGY 1 The Current Status of Gap and U.S.-Origin Nuclear Fuel Removals 2011 Jeff Galan, Deputy Project Manager U.S.-Origin Nuclear Remove Program National Nuclear Security Administration Global Threat Reduction Initiative Defense Nuclear Nonproliferation U.S. DEPARTMENT OF ENERGY 2 GTRI Mission and Goals GTRI is: A part of President Obama's comprehensive strategy to prevent nuclear terrorism; and The key organization responsible for implementing the U.S. HEU minimization policy. GTRI MISSION Reduce and protect vulnerable nuclear and radiological material located at civilian sites worldwide. DOE STRATEGIC GOAL 2.2 Prevent the acquisition of nuclear and radiological materials for use in weapons of mass destruction and other

448

Dose Reduction Techniques  

SciTech Connect

As radiation safety specialists, one of the things we are required to do is evaluate tools, equipment, materials and work practices and decide whether the use of these products or work practices will reduce radiation dose or risk to the environment. There is a tendency for many workers that work with radioactive material to accomplish radiological work the same way they have always done it rather than look for new technology or change their work practices. New technology is being developed all the time that can make radiological work easier and result in less radiation dose to the worker or reduce the possibility that contamination will be spread to the environment. As we discuss the various tools and techniques that reduce radiation dose, keep in mind that the radiological controls should be reasonable. We can not always get the dose to zero, so we must try to accomplish the work efficiently and cost-effectively. There are times we may have to accept there is only so much you can do. The goal is to do the smart things that protect the worker but do not hinder him while the task is being accomplished. In addition, we should not demand that large amounts of money be spent for equipment that has marginal value in order to save a few millirem. We have broken the handout into sections that should simplify the presentation. Time, distance, shielding, and source reduction are methods used to reduce dose and are covered in Part I on work execution. We then look at operational considerations, radiological design parameters, and discuss the characteristics of personnel who deal with ALARA. This handout should give you an overview of what it takes to have an effective dose reduction program.

WAGGONER, L.O.

2000-05-16T23:59:59.000Z

449

National Idling Reduction Network News- December 2012  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

450

National Idling Reduction Network News- December 2013  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

451

National Idling Reduction Network News- January 2014  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

452

National Idling Reduction Network News- October 2011  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

453

National Idling Reduction Network News- December 2010  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

454

National Idling Reduction Network News- October 2009  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

455

National Idling Reduction Network News- May 2012  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

456

National Idling Reduction Network News- October 2013  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

457

National Idling Reduction Network News- January 2013  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

458

National Idling Reduction Network News- August 2013  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

459

National Idling Reduction Network News- April 2011  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

460

National Idling Reduction Network News- November 2010  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

National Idling Reduction Network News- February 2013  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

462

National Idling Reduction Network News- July 2013  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

463

National Idling Reduction Network News- March 2012  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

464

Global Threat Reduction Initiative | Department of Energy  

Office of Environmental Management (EM)

Reduction Initiative An overview of the Global Threat Reduction Initiative, U.S.-Origin Nuclear Fuel Removals. Global Threat Reduction Initiative More Documents &...

465

National Idling Reduction Network News- May 2010  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

466

National Idling Reduction Network News- August 2010  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

467

National Idling Reduction Network News- February 2011  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

468

National Idling Reduction Network News- April 2013  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

469

Economic Analysis of Commercial Idling Reduction Technologies...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Technologies: Which idling reduction system is most economical for truck owners? Economic Analysis of Commercial Idling Reduction Technologies: Which idling reduction system...

470

National Idling Reduction Network News- June 2012  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

471

National Idling Reduction Network News- April 2012  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

472

National Idling Reduction Network News- March 2013  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

473

National Idling Reduction Network News- May 2013  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

474

National Idling Reduction Network News- November 2011  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

475

Water Use Reduction | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Reduction Water Use Reduction Water Use Reduction The Federal Energy Management Program (FEMP) provides agencies with guidance and direction on how to reduce water use and increase...

476

National Idling Reduction Network News- February 2014  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

477

National Idling Reduction Network News- April 2014  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

478

National Idling Reduction Network News- March 2014  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

479

National Idling Reduction Network News- September 2009  

Energy.gov (U.S. Department of Energy (DOE))

Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

480

Pollution Prevention, Waste Reduction, and Recycling | Department...  

Office of Environmental Management (EM)

Pollution Prevention, Waste Reduction, and Recycling Pollution Prevention, Waste Reduction, and Recycling The Pollution Prevention, Waste Reduction and Recycling Program was...

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

ARRT Courses & Schedule | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

ARRT Courses & Schedule ARRT Courses & Schedule ARRT Courses & Schedule Advanced Radiological Response Techniques (ARRT) Courses The ARRT series, developed by the Defense Nuclear Weapons School, was designed specifically for the National Guard Bureau's Weapons of Mass Destruction's Civil Support Teams. The course, however, is open to other agencies that may have radiological response missions. Scenario-driven exercises cover everything from radiation fundamentals and material detection to handling and safely containing nuclear materials. The ARRT series can be used as either initial training or a refresher for attendees. Topics include the following: Consequence Management Contaminated Casualty Extraction Contamination Control Decontamination Hotline Operations Material Packaging

482

EA-1061: The Off-site Volume Reduction of Low-level Radioactive Waste From  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: The Off-site Volume Reduction of Low-level Radioactive 1: The Off-site Volume Reduction of Low-level Radioactive Waste From the Savannah River Site, Aiken, South Carolina EA-1061: The Off-site Volume Reduction of Low-level Radioactive Waste From the Savannah River Site, Aiken, South Carolina SUMMARY This EA evaluates the environmental impacts of the proposal for off-site volume reduction of low-level radioactive wastes generated at the U.S. Department of Energy's Savannah River Site located near Aiken, South Carolina. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD July 28, 1995 EA-1061: Finding of No Significant Impact The Off-site Volume Reduction of Low-level Radioactive Waste From the Savannah River Site July 28, 1995 EA-1061: Final Environmental Assessment The Off-site Volume Reduction of Low-level Radioactive Waste From the

483

FINAL SCHEDULE FOR CHIEF OF STAFF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wednesday, July 11, 2001 Wednesday, July 11, 2001 10:00 AM PROGRAM DIRECTOR'S MEETING 10:30 AM Secretary's Conference Room Lead & Attending Staff: McSlarrow Attending Staff: McMonigle and Dandy Attendees: ESA2; ESA3 10:30 AM MEETING W/CHUCK DOMINY (HALLIBURTON 11:00 AM COMPANY) McSlarrow's Office Jim Andrews 11:45 AM DEPART EN ROUTE TO PLAZA 12:00 PM LUNCH MEETING 1:30 PM American Grill - Loew's Plaza 1:30 PM DEPART EN ROUTE TO DOE 2:00 PM ELECTRICITY ADVISORY BOARD 2:30 PM TBD 4:30 PM (T) MEETING W/GREG RENKES 5:00 PM McSlarrow's Office Page 13 (3/22/2002. 4:54 PM) Internal Distribution 26076 FINAL SCHEDULE FOR CHIEF OF STAFF Thursday, July 12, 2001 8:45 AM MEETING W/JEFF LAWRENCE & MICHAEL CROWE 9:00 AM (PROVOST/UNIV. OF COLUMBIA) McSlarrow's Office 10:00 AM DEFENSE MEETING 10:30 AM Secretary's Office

484

Polynomial Time Algorithms for Minimum Energy Scheduling  

E-Print Network (OSTI)

The aim of power management policies is to reduce the amount of energy consumed by computer systems while maintaining satisfactory level of performance. One common method for saving energy is to simply suspend the system during the idle times. No energy is consumed in the suspend mode. However, the process of waking up the system itself requires a certain fixed amount of energy, and thus suspending the system is beneficial only if the idle time is long enough to compensate for this additional energy expenditure. In the specific problem studied in the paper, we have a set of jobs with release times and deadlines that need to be executed on a single processor. Preemptions are allowed. The processor requires energy L to be woken up and, when it is on, it uses one unit of energy per one unit of time. It has been an open problem whether a schedule minimizing the overall energy consumption can be computed in polynomial time. We solve this problem in positive, by providing an O(n^5)-time algorithm. In addition we pr...

Baptiste, Philippe; Durr, Christoph

2009-01-01T23:59:59.000Z

485

Solar Energy: Impacts & Management MeasuresSolar Energy: Impacts & Management Measures Vasilis Fthenakis  

E-Print Network (OSTI)

.pv.bnl.gov www.clca.columbia.edu #12;2 OutlineOutline Photovoltaics status & potential Life-cycle environmental impacts & comparisons with other power generation · Energy use · Emissions · Land use · Endangered species Environmental Impact Resource Availability #12;9 Affordability - Cost Reductions Prices and Production Costs

Ohta, Shigemi

486

RECYCLING AND REMOVAL OF OFFSHORE WIND TURBINES AN INTERACTIVE METHOD FOR REDUCTION OF NEGATIVE ENVIRONMENTAL EFFECTS  

E-Print Network (OSTI)

RECYCLING AND REMOVAL OF OFFSHORE WIND TURBINES ­ AN INTERACTIVE METHOD FOR REDUCTION OF NEGATIVE.borup@risoe.dk ABSTRACT: This paper describes a method for reduction of negative environmental impacts of wind turbines and an analysis of future removal and recycling processes of offshore wind turbines. The method is process

487

DOE Announces Yucca Mountain License Application Schedule | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Yucca Mountain License Application Schedule Yucca Mountain License Application Schedule DOE Announces Yucca Mountain License Application Schedule July 19, 2006 - 3:13pm Addthis New Director Ward Sproat Testifies on Revised Timeline WASHINGTON, DC - The Department of Energy (DOE) today announced that it will submit a license application to the Nuclear Regulatory Commission (NRC) for a nuclear waste repository at Yucca Mountain, Nevada, no later than June 30, 2008. The Department also announced that if requested legislative changes are enacted, the repository will be able to accept spent nuclear fuel and high-level waste starting in early 2017. Announcing a schedule for submitting a license application is another step in the Department's mission to provide stability, clarity and predictability in moving the Yucca Mountain Project forward as quickly as

488

Potomac River Project Outage Schedule Clarification | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River Project Outage Schedule Clarification River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

489

Potomac River Project Outage Schedule Clarification | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Potomac River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits Notification of Planned 230kV Outage at Potomac River Generating Station PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the

490

Proposal Submittal and Scheduling Procedures for Research | Stanford  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Submittal and Scheduling Procedures for Research Proposal Submittal and Scheduling Procedures for Research New Proposals Standard GU Proposals Instructions for New Standard Proposals (Not LOI or Rapid Access) Tips for How to Wow Rapid Access Letter of Intent (LOI) Proposal Extension Requests X-ray/VUV Macromolecular Crystallography Beam Time Allocation/Scheduling How to Request Beam Time SSRL Access Policy SSRL Schedules New Proposals SSRL operates as a dedicated synchrotron radiation source for approximately nine months per year (usually from early November through early August). Submitting a proposal is the first step to access beam time at SSRL. SSRL scientists are available to help answer questions about the accelerator (SPEAR3), beam lines, capabilities, science or techniques to help users plan their experiments and their SSRL proposals.

491

SSRL Experimental Run Schedule | Stanford Synchrotron Radiation Lightsource  

NLE Websites -- All DOE Office Websites (Extended Search)

Experimental Run Schedule Experimental Run Schedule SLAC National Accelerator Laboratory will be closed for the winter holidays, December 21, 2013 through January 5, 2014. SSRL generally operates November through August, using the shutdown period for upgrades and maintenance projects. SSRL operates at 500mA and employs a frequent fill schedule to maintain the SPEAR3 current approximately constant. Automatic injections will be conducted every 5 minutes. Automatic injections will only occur at the designated 5 minute intervals (i.e., on the hour and every 5 minutes thereafter). If the injector is not functional at the designated fill time, then the fill will be skipped. The current will be replenished at the next scheduled fill time after the injector is repaired and normal injection intervals will resume. The operator will give

492

QAMF-002_ACourse Registry/Review Schedule Intitial Release D  

NLE Websites -- All DOE Office Websites (Extended Search)

2_ACourse Registry/Review Schedule 2_ACourse Registry/Review Schedule Intitial Release D E A B C Revision History: Rev. Description of Change [N/A Referenced Documents: Parent Document: QAMF-002 Rev. A Approvers: Melissa Otero Document Owner: Elizabeth Sousa Backup Owner: Notify of Changes: EOTA - Business Form Document Title: QAMP-002 Project/Course Maintenance Process Document Number: Course Registry/Review Schedule EOTA Employees Melissa Otero QAMF-002_ACourse Registry/Review Schedule CIP100D Introduction to Analytical Risk Management CIP101DW DOE/NNSA Asset Overview (formerly RAP-165DW) CIP110DW Vehicle Bomb Search Methods CIP300DC Weapons of Mass Destruction (WMD): Training CIP400DC Weapons of Mass Destruction (WMD): Training Exercises CMP101DW Operations Overview of Consequence Management CMP104DW Health and Safety Orientation

493

Omega Laser Facility Schedule - Laboratory for Laser Energetics  

NLE Websites -- All DOE Office Websites (Extended Search)

Schedule - Laboratory for Laser Energetics Laboratory for Laser Energetics Logo Search Home Around the Lab Past Issues Past Quick Shots About Office of the Director Map to LLE LLE...

494

Optimal Coordination Mechanisms for Multi-job Scheduling Games  

Science Journals Connector (OSTI)

We consider the unrelated machine scheduling game in which players control subsets of jobs. Each players objective is to minimize the weighted sum of completion time of her jobs, while the social cost is the ...

Fidaa Abed; Jos R. Correa; Chien-Chung Huang

2014-01-01T23:59:59.000Z

495

Gain scheduling for geometrically nonlinear flexible space structures  

E-Print Network (OSTI)

A gain-scheduling approach for the control of geometrically nonlinear structures is developed. The objective is to improve performance over current linear design techniques that are applied to the same control problem. The ...

Yung, Jeremy Hoyt, 1971-

2002-01-01T23:59:59.000Z

496

Time and event triggered communication scheduling for automotive applications  

E-Print Network (OSTI)

automotive electronics applications by a number of European car and heavy truck manufacturers systems within automotive electronics applications by a number of European car and heavy truckTime and event triggered communication scheduling for automotive applications ROGER JOHANSSON

Johansson, Roger

497

A hybrid bin-packing heuristic to multiprocessor scheduling  

E-Print Network (OSTI)

A hybrid bin-packing heuristic to multiprocessor scheduling. Adriana Alvim (alvim ***at*** inf.puc-rio.br) Celso Ribeiro (celso ***at*** inf.puc-rio.br). Abstract: The...

Adriana Alvim

498

Integration of process planning and scheduling a review  

Science Journals Connector (OSTI)

In recent years, a few researchers have addressed the need for the integration of process planning and scheduling functions in order to achieve ... that the potential savings are substantial when process planning

Wei Tan; Behrokh Khoshnevis

2000-02-01T23:59:59.000Z

499

Optimal Design and Scheduling of Unsteady State Material Recovery Networks  

E-Print Network (OSTI)

methodologies: the first is a hierarchical multi-step methodology developed for the design and scheduling of batch water (material of interest) recycle networks. A new source- double tank-sink arrangement is introduced to overcome the limitation of samecycle...

Rabie, Arwa H.

2010-01-14T23:59:59.000Z

500

Argonne Training Program on Extreme-Scale Computing Scheduled...  

NLE Websites -- All DOE Office Websites (Extended Search)

10-petaflops supercomputer ushers in a new scientific era at the ALCF. Argonne Training Program on Extreme-Scale Computing Scheduled for August 2-14, 2015 Author: Brian...