Green Scheduling: Scheduling of Control Systems for Peak Power Reduction  

E-Print Network (OSTI)

approaches for load shifting and model predictive control have been proposed, we present an alternative approach to reduce the peak power for a set of control systems. The proposed model is intuitive, scalableGreen Scheduling: Scheduling of Control Systems for Peak Power Reduction Truong Nghiem, Madhur Behl

Pappas, George J.

2

Schedules of Key Environmental Impact Statements  

Energy.gov (U.S. Department of Energy (DOE))

This document graphically displays the milestone dates and projected schedules of key Environmental Impact Statements (updated monthly).This chart represents anticipated activity and is not a...

3

Cost and schedule reduction for next-generation Candu  

Science Conference Proceedings (OSTI)

AECL has developed a suite of technologies for Candu{sup R} reactors that enable the next step in the evolution of the Candu family of heavy-water-moderated fuel-channel reactors. These technologies have been combined in the design for the Advanced Candu Reactor TM1 (ACRTM), AECL's next generation Candu power plant. The ACR design builds extensively on the existing Candu experience base, but includes innovations, in design and in delivery technology, that provide very substantial reductions in capital cost and in project schedules. In this paper, main features of next generation design and delivery are summarized, to provide the background basis for the cost and schedule reductions that have been achieved. In particular the paper outlines the impact of the innovative design steps for ACR: - Selection of slightly enriched fuel bundle design; - Use of light water coolant in place of traditional Candu heavy water coolant; - Compact core design with unique reactor physics benefits; - Optimized coolant and turbine system conditions. In addition to the direct cost benefits arising from efficiency improvement, and from the reduction in heavy water, the next generation Candu configuration results in numerous additional indirect cost benefits, including: - Reduction in number and complexity of reactivity mechanisms; - Reduction in number of heavy water auxiliary systems; - Simplification in heat transport and its support systems; - Simplified human-machine interface. The paper also describes the ACR approach to design for constructability. The application of module assembly and open-top construction techniques, based on Candu and other worldwide experience, has been proven to generate savings in both schedule durations and overall project cost, by reducing premium on-site activities, and by improving efficiency of system and subsystem assembly. AECL's up-to-date experience in the use of 3-D CADDS and related engineering tools has also been proven to reduce both engineering and construction costs through more efficient work planning and use of materials, through reduced re-work and through more precise configuration management. Full-scale exploitation of AECL's electronic engineering and project management tools enables further reductions in cost. The Candu fuel-channel reactor type offers inherent manufacturing and construction advantages through the application of a simple, low-pressure low-temperature reactor vessel along with modular fuel channel technology. This leads to cost benefits and total project schedule benefits. As a result, the targets which AECL has set for replication units - overnight capital cost of $1000 US/kW and total project schedule (engineering/manufacturing/construction/commissioning) of 48 months, have been shown to be achievable for the reference NG Candu design. (authors)

Hopwood, J.M.; Yu, S.; Pakan, M.; Soulard, M. [Atomic Energy of Canada Limited, 2251 Speakman Drive, Mississauga, Ontario, L5K 1B2 (Canada)

2002-07-01T23:59:59.000Z

4

Scalable Scheduling of Building Control Systems for Peak Demand Reduction  

E-Print Network (OSTI)

is model predictive control (MPC) ([6], [7]). In [6] the authors inves- tigated MPC for thermal energyScalable Scheduling of Building Control Systems for Peak Demand Reduction Truong X. Nghiem, Madhur operation of sub- systems such as heating, ventilating, air conditioning and refrigeration (HVAC&R) systems

Pappas, George J.

5

Pollution Prevention - Environmental Impact Reduction Checklists for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pollution Prevention - Environmental Impact Reduction Checklists Pollution Prevention - Environmental Impact Reduction Checklists for NEPA/309 Reviewers Pollution Prevention - Environmental Impact Reduction Checklists for NEPA/309 Reviewers The environmental review process under the National Environmental Policy Act (NEPA) provides a valuable opportunity for Federal agency NEPA/309 reviewers to incorporate pollution prevention and environmental impact reduction into actions (or projects). This Environmental Protection Agency guidance was prepared to assist NEPA/309 reviewers in incorporating pollution prevention into each step of the environmental review process, including scoping, mitigation, monitoring, and enforcement. POLLUTION PREVENTION - ENVIRONMENTAL IMPACT REDUCTION CHECKLISTS FOR NEPA/309 REVIEWERS JANUARY 1995

6

Pollution Prevention - Environmental Impact Reduction Checklists for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pollution Prevention - Environmental Impact Reduction Checklists Pollution Prevention - Environmental Impact Reduction Checklists for NEPA/309 Reviewers Pollution Prevention - Environmental Impact Reduction Checklists for NEPA/309 Reviewers The environmental review process under the National Environmental Policy Act (NEPA) provides a valuable opportunity for Federal agency NEPA/309 reviewers to incorporate pollution prevention and environmental impact reduction into actions (or projects). This Environmental Protection Agency guidance was prepared to assist NEPA/309 reviewers in incorporating pollution prevention into each step of the environmental review process, including scoping, mitigation, monitoring, and enforcement. POLLUTION PREVENTION - ENVIRONMENTAL IMPACT REDUCTION CHECKLISTS FOR NEPA/309 REVIEWERS JANUARY 1995

7

Power consumption scheduling for peak load reduction in smart grid homes  

Science Conference Proceedings (OSTI)

This paper presents a design and evaluates the performance of a power consumption scheduler in smart grid homes, aiming at reducing the peak load in individual homes as well as in the system-wide power transmission network. Following the task model consist ... Keywords: execution time, home controller, peak load reduction, power schedule, smart grid

Junghoon Lee; Gyung-Leen Park; Sang-Wook Kim; Hye-Jin Kim; Chang Oan Sung

2011-03-01T23:59:59.000Z

8

Bypass aware instruction scheduling for register file power reduction  

Science Conference Proceedings (OSTI)

Since register files suffer from some of the highest power densities within processors, designers have investigated several architectural strategies for register file power reduction, including "On Demand RF Read" where the register file is read only ... Keywords: architecture-sensitive compiler, bypass-sensitive, forwarding paths, operation table, power consumption, processor bypasses, register file, reservation table

Sanghyun Park; Aviral Shrivastava; Nikil Dutt; Alex Nicolau; Yunheung Paek; Eugene Earlie

2006-07-01T23:59:59.000Z

9

Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Schedules Schedules Schedules Print Current Long-Term Operating Schedule August-December 2013 Upcoming Long-Term Operating Schedule January-July 2014 New! ALS Operating Schedule on Google Calendar Past Long-Term Operating Schedules January-July 2013 July-December 2012 January-June 2012 July-December 2011 January-June 2011 July-December 2010 January-June 2010 July-December 2009 January-June 2009 July-December 2008 January-June 2008 July-December 2007 February-June 2007 July 2006-February 2007 January-June 2006 July-December 2005 January-June 2005 June-December 2004 December 2003-May 2004 June 2003-November 2003 December 2002-May 2003 June 2002-November 2002 December 2001-May 2002 May 2001-December 2001 January 2001-April 2001 July 2000-December 2000 January 2000-June 2000 April 1999-December 1999

10

Green Scheduling of Control Systems for Peak Demand Reduction Truong X. Nghiem, Madhur Behl, Rahul Mangharam and George J. Pappas  

E-Print Network (OSTI)

scheduling scheme for a set of control systems. The proposed model is scalable and effective for the large for commercial buildings and data centers is model predictive control (MPC) ([4], [5], [6], [7]). MPC iGreen Scheduling of Control Systems for Peak Demand Reduction Truong X. Nghiem, Madhur Behl, Rahul

Pappas, George J.

11

Impact of Heavy Duty Vehicle Emissions Reductions on Global Climate  

Science Conference Proceedings (OSTI)

The impact of a specified set of emissions reductions from heavy duty vehicles on climate change is calculated using the MAGICC 5.3 climate model. The integrated impact of the following emissions changes are considered: CO2, CH4, N2O, VOC, NOx, and SO2. This brief summarizes the assumptions and methods used for this calculation.

Calvin, Katherine V.; Thomson, Allison M.

2010-08-01T23:59:59.000Z

12

No Significant Impact Effluent Reduction Los Alamos National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Finding of Finding of No Significant Impact Effluent Reduction Los Alamos National Laboratory Los Alamos, New Mexico U. S. Department of Energy Los Alamos Area Office 528 35th Street Los Alamos, NM 87544 DEPARTMENT OF ENERGY FINDING OF NO SIGNIFICANT IMPACT EFFLUENT REDUCTION LOS ALAMOS NATIONAL LABORATORY EFFLUENT REDUCTION FINAL ENVIRONMENTAL ASSESSMENT: The Environmental Assessment (EA) for Effluent Reduction (DOE/EA-1156) (attached) briefly provides sufficient evidence and analysis t o determine that a finding of no significant impact is appropriate for this action. The EA documents the evidence and analysis in the following chapters: 1. Purpose and Need for Agency Action; 2. Description of Alternatives; 3. Affected Environment and Environmental Consequences; 4. Abnormal Events; 5. Agencies

13

Energy Market Impacts of Alternative Greenhouse Gas Intensity Reduction Goals  

Gasoline and Diesel Fuel Update (EIA)

1 1 Energy Market Impacts of Alternative Greenhouse Gas Intensity Reduction Goals March 2006 Energy Information Administration Office of Integrated Analysis and Forecasting U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should be attributed to the Energy Information Administration and should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Service Reports are prepared by the Energy Information Administration upon special request and are based on assumptions specified by the requester. Energy Information Administration / Energy Market Impacts of Alternative Greenhouse Gas Intensity Reduction Goals

14

Document Status & Schedules  

Energy.gov (U.S. Department of Energy (DOE))

This document graphically displays the milestone dates and projected schedules of key Environmental Impact Statements (updated monthly).

15

Residential duct system leakage; Magnitude, impacts, and potential for reduction  

Science Conference Proceedings (OSTI)

This paper discusses the issues associated with leakage in residential air distribution systems, touching on the prevalence of duct leakage, the impacts of duct leakage, and on the techniques available for sealing duct systems. The issues examined in detail are: present techniques for measuring the leakage area of ducts existing data bases of duct leakage area measurements, the impacts of duct leakage on space-conditioning energy consumption and peak demand, and the ventilation impacts of duct leakage. The paper also includes a brief discussion of techniques for sealing duct systems in the field. The results derived from duct leakage are and driving pressure measurements indicate that in regions in which distribution systems pass through unconditioned spaces, air infiltration rates will typically double when the distribution fan is turned on, and that the average annual air infiltration rate is increased by 30% to 70% due to the existence of the distribution system. Estimates based upon a simplified analysis of leakage-induced energy losses also indicate the peak electricity demands due to duct leakage can be as high as 4 kW in Sacramento, California, and West Palm Beach, Florida, and that peak loads on the order of 1 to 2 kW are highly likely in these locations. Both peak loads and annual energy impacts are found to be strongly dependent on the location of the return duct, and attic return costing approximately 1500 kWh more energy than a crawlspace return in the two climates examined.

Modera, M.P. (Lawrence Berkeley Lab., Berkeley, CA (US))

1989-01-01T23:59:59.000Z

16

Impact of 1980 scheduled capacity additions on electric-utility oil consumption  

SciTech Connect

The electric-utility sector currently consumes approximately 8% of the total oil used in the Nation. This oil represented about 15% of total fuel consumed by electric utilities in 1979. Two important factors that affect the level of utility oil consumption in 1980 are the substantial increase in coal-fired generating capacity and the uncertainty surrounding nuclear-plant licensing. With particular emphasis on these considerations, this report analyzes the potential for changes in electric-utility oil consumption in 1980 relative to the 1979 level. Plant conversions, oil to coal, for example, that may occur in 1980 are not considered in this analysis. Only the potential reduction in oil consumption resulting from new generating-capacity additions is analyzed. Changes in electric-utility oil consumption depend on, among other factors, regional-electricity-demand growth and generating-plant mix. Five cases are presented using various electricity-demand-growth rate assumptions, fuel-displacement strategies, and nuclear-plant-licensing assumptions. In general, it is likely that there will be a reduction in electric-utility oil consumption in 1980. Using the two reference cases of the report, this reduction is projected to amount to a 2 to 5% decrease from the 1979 oil-consumption level; 7% reduction is the largest reduction projected.

Gielecki, M.; Clark, G.; Roberts, B.

1980-08-01T23:59:59.000Z

17

Modeling of CO2 Reduction Impacts on Energy Prices with Modelica Philip Machanick1  

E-Print Network (OSTI)

Price mean reversion rate" ; Real relEnergyPrice (start = 1); Real energyCostTrend (start = 1); Real[i,j,k]; end nextStep; equation energyCostTrend = relEnergyPrice * energyUse / baseEnergyUse; // usefulModeling of CO2 Reduction Impacts on Energy Prices with Modelica Philip Machanick1 , Ariel Liebman1

Machanick, Philip

18

Air quality impacts of highway construction and scheduling. Research report, September 1996--May 1998  

Science Conference Proceedings (OSTI)

In addition to the state`s four urban areas currently designated as non-attainment areas, there is one maintenance area and four non-attainment areas. A large proportion of the state`s population resides within these nine urban areas. This project provides information to the Texas Department of Transportation on the impacts of highway construction on corridor and regional mobile source emissions inventories. The project also provides information on the additional construction costs incurred by highway contractors who are required to participate in ozone alert programs. This information will allow the Department to make more informed policy decisions on whether or not to include highway construction projects in ozone alert programs.

Perkinson, D.G.

1998-05-01T23:59:59.000Z

19

Analyzing and minimizing the impact of opportunity cost in QoS-aware job scheduling.  

Science Conference Proceedings (OSTI)

Quality of service (QoS) mechanisms allowing users to request for turn-around time guarantees for their jobs have recently generated much interest. In our previous work we had designed a framework, QoPS, to allow for such QoS. This framework provides an admission control mechanism that only accepts jobs whose requested deadlines can be met and, once accepted, guarantees these deadlines. However, the framework is completely blind to the revenue these jobs can fetch for the supercomputer center. By accepting a job, the supercomputer center might relinquish its capability to accept some future arriving (and potentially more expensive) jobs. In other words, while each job pays an explicit price to the system for running it, the system may also be viewed as paying an implicit opportunity cost by accepting the job. Thus, accepting a job is profitable only when the job's price is higher than its opportunity cost. In this paper we analyze the impact such opportunity cost can have on the overall revenue of the supercomputer center and attempt to minimize it through predictive techniques. Specifically, we propose two extensions to QoPS, Value-aware QoPS (VQoPS) and Dynamic Value-aware QoPS (DVQoPS), to provide such capabilities. We present detailed analysis of these schemes and demonstrate using simulation that they not only achieve several factors improvement in system revenue, but also good service differentiation as a much desired side-effect.

Islam, M.; Balaji, P.; Sabin, G.; Sadayappan, P. (Mathematics and Computer Science); (Ohio State Univ.)

2007-01-01T23:59:59.000Z

20

Energy Efficiency / Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Vol. II Technical Report  

E-Print Network (OSTI)

The Energy Systems Laboratory, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its third annual report, Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan (TERP) to the Texas Commission on Environmental Quality (TCEQ). The report is organized in three volumes. Volume 1 Summary Report, provides an executive summary with key areas summarized; Volume II Technical Report, provides a detailed report of activities, methodologies and findings; Volume III Technical Appendix, contains detailed data from simulations for each of the forty-one counties included in the analysis.

Degelman, L. O.; Yazdani, B.; Fitzpatrick, T.; Verdict, M.; Liu, Z.; Muns, S.; Ahmad, M.; Turner, W. D.; Culp, C.; Haberl, J. S.; Bryant, J.; Baltazar-Cervantes, J. C.; Gilman, D.

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP): Volume I  

E-Print Network (OSTI)

The Energy Systems Laboratory (Laboratory), at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its fifth annual report, Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan to the Texas Commission on Environmental Quality. The report is organized in three volumes. Volume I Summary Report provides an executive summary and overview; Volume II Technical Report provides a detailed report of activities, methodologies and findings; Volume III Technical Appendix contains detailed data from simulations for each of the counties included in the analysis.

Haberl, Jeff; Culp, Charles; Yazdani, Bahman; Gilman, Don; Fitzpatrick, Tom; Muns, Shirley; Liu, Zi; Baltazar, Juan Carlos; Mukhopadhyay, Jaya; Degelman, Larry; Claridge, David

2008-12-01T23:59:59.000Z

22

Energy Efficiency / Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Vol. I Summary Report  

E-Print Network (OSTI)

The Energy Systems Laboratory, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its third annual report, Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan to the Texas Commission on Environmental Quality. The report is organized in three volumes. Volume 1 Summary Report, provides an executive summary with key areas summarized; Volume II Technical Report, provides a detailed report of activities, methodologies and findings; Volume III Technical Appendix, contains detailed data from simulations for each of the forty-one counties included in the analysis.

Haberl, J. S.; Culp, C.; Yazdani, B.; Gilman, D.; Fitzpatrick, T.; Muns, S.; Verdict, M.; Ahmad, M.; Liu, Z.; Baltazar-Cervantes, J. C.; Bryant, J.; Degelman, L. O.; Turner, W. D.

2004-01-01T23:59:59.000Z

23

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP): Vol. II  

E-Print Network (OSTI)

The Energy Systems Laboratory (Laboratory), at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its fifth annual report, Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan to the Texas Commission on Environmental Quality. The report is organized in three volumes. Volume I Summary Report provides an executive summary and overview; Volume II Technical Report provides a detailed report of activities, methodologies and findings; Volume III Technical Appendix contains detailed data from simulations for each of the counties included in the analysis.

Haberl, Jeff; Culp, Charles; Yazdani, Bahman; Gilman, Don; Fitzpatrick, Tom; Muns, Shirley; Verdict, Malcolm; Ahmed, M.; Liu, Zi; Baltazar, Juan Carlos; Montgomery, Cynthia; McKelvey, Katherine; Mukhopadhyay, Jaya; Degelman, Larry

2008-12-01T23:59:59.000Z

24

Rate Schedules  

Energy.gov (U.S. Department of Energy (DOE))

One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate...

25

Work Schedules  

Science Conference Proceedings (OSTI)

... All employee's scheduled tour must be between 7:00 am and 7:00 pm Once adopted, change from this alternative can be made only with approval ...

2010-10-05T23:59:59.000Z

26

Reduction of Electric Vehicle Life-Cycle Impacts through Battery Recycling  

NLE Websites -- All DOE Office Websites (Extended Search)

Reduction of Electric Vehicle Life-Cycle Impacts through Battery Recycling 29 th International Battery Seminar and Exhibit Ft. Lauderdale, FL March 15, 2012 The submitted manuscript has been created by UChicago Argonne, LLC, Operator of Argonne National Laboratory ("Argonne"). Argonne, a U.S. Department of Energy Office of Science laboratory, is operated under Contract No. DE-AC02-06CH11357. The U.S. Government retains for itself, and others acting on its behalf, a paid-up nonexclusive, irrevocable worldwide license in said article to reproduce, prepare derivative works, distribute copies to the public, and perform publicly and display publicly, by or on behalf of the Government. Why think about recycling?  Material scarcity alleviated

27

IMPACTS OF ANTIFOAM ADDITIONS AND ARGON BUBBLING ON DEFENSE WASTE PROCESSING FACILITY REDUCTION/OXIDATION  

Science Conference Proceedings (OSTI)

During melting of HLW glass, the REDOX of the melt pool cannot be measured. Therefore, the Fe{sup +2}/{Sigma}Fe ratio in the glass poured from the melter must be related to melter feed organic and oxidant concentrations to ensure production of a high quality glass without impacting production rate (e.g., foaming) or melter life (e.g., metal formation and accumulation). A production facility such as the Defense Waste Processing Facility (DWPF) cannot wait until the melt or waste glass has been made to assess its acceptability, since by then no further changes to the glass composition and acceptability are possible. therefore, the acceptability decision is made on the upstream process, rather than on the downstream melt or glass product. That is, it is based on 'feed foward' statistical process control (SPC) rather than statistical quality control (SQC). In SPC, the feed composition to the melter is controlled prior to vitrification. Use of the DWPF REDOX model has controlled the balanjce of feed reductants and oxidants in the Sludge Receipt and Adjustment Tank (SRAT). Once the alkali/alkaline earth salts (both reduced and oxidized) are formed during reflux in the SRAT, the REDOX can only change if (1) additional reductants or oxidants are added to the SRAT, the Slurry Mix Evaporator (SME), or the Melter Feed Tank (MFT) or (2) if the melt pool is bubble dwith an oxidizing gas or sparging gas that imposes a different REDOX target than the chemical balance set during reflux in the SRAT.

Jantzen, C.; Johnson, F.

2012-06-05T23:59:59.000Z

28

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Vol. II - Technical Report  

E-Print Network (OSTI)

The Energy Systems Laboratory, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its fourth annual report, Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan to the Texas Commission on Environmental Quality.

Haberl, J. S.; Culp, C.; Yazdani, B.; Gilman, D.; Fitzpatrick, T.; Muns, S.; Verdict, M.; Ahmed, M.; Liu, Z.; Baltazar-Cervantes, J. C.; Degelman, L. O.; Turner, W. D.

2006-11-01T23:59:59.000Z

29

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Vol. III - Technical Appendix  

E-Print Network (OSTI)

The Energy Systems Laboratory, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its fourth annual report, Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan to the Texas Commission on Environmental Quality.

Baltazar-Cervantes, J. C.; Gilman, D.; Verdict, M.; Yazdani, B.; Ahmed, M.; Muns, S.; Fitzpatrick, T.; Liu, Z.; Turner, W. D.; Degelman, L. O.; Haberl, J. S.; Culp, C.

2006-10-31T23:59:59.000Z

30

SI Group Scheduling Page  

NLE Websites -- All DOE Office Websites (Extended Search)

Personnel On-Call Page Beamline Validation Schedule Group Organizational Chart Reviews Presentations Group Scheduling Page Project Scheduling Information Ops Scheduling Info Project / Scheduling Info APS fy2005 Annual Schedule ( html ) PSS Validation Schedule APS fy2006 Annual Schedule (html) PSS Validation Teams Latest Machine Studies Schedule (pdf) (html) New Builds Schedule (For SI GROUP Reference Only) Parasitic Beam Operations Schedule Ops Scheduling Page Shutdown Information Work Schedules August/September Shutdown Shutdown Work List Validation Schedule Safety Info Work Request Links ISM Core Functions Enter / Search Work Requests APS Safety Page Modify / Approve Work Requests Radiation Safety Policy APS TMS Training Profiles MSDS Search This page maintained by Joe Budz

31

Rate schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Firm Power Service Provided by Rate/Charges Firm Power Service Provided by Rate/Charges Rate/Charges Effective Through (or until superceded) Firm Sales (SLIP-F9) Composite Rate SLIP 29.62 mills/kWh 9/30/2015 Demand Charge SLIP $5.18/kW-month 9/30/2015 Energy Charge SLIP 12.19 mills/kWh 9/30/2015 Cost Recovery Charge (CRC) SLIP 0 mills/kWh 9/30/2015 Transmission Service Provided by Current Rates effective10/12 - 9/15 (or until superceded) Rate Schedule Effective Through Firm Point-to-Point Transmission (SP-PTP7) CRSP $1.14 per kW-month $13.69/kW-year $0.00156/kW-hour $0.04/kW-day $0.26/kW-week 10/1/2008-9/30/2015 Network Integration Transmission (SP-NW3) CRSP see rate schedule 10/1/2008-9/30/2015 Non-Firm Point-to-Point Transmission (SP-NFT6) CRSP see rate schedule 10/1/2008-9/30/2015 Ancillary Services Provided by Rate Rate Schedule

32

Presentation Schedule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Presentation Schedule Presentation Schedule (30 Min) Dave Wade - Dose Comparisons of once-thru and closed fuel cycles. (30 Min) Ralph Bennett - Roadmap Overview (15 Min) Neil Todreas - GRNS Perspectives and Recommendations (75 Min) Neil Todreas / - NERAC DISCUSSION Sal Levy 2 Generation IV Roadmap NERAC Subcommittee (GRNS) Bobby Abrams* Duke Engineering Douglas Chapin MPR Associates B. John Garrick Independent Consultant Dan Kammen University of California- Berkeley 3 Salomon Levy ** Levy & Associates Ted Marston Electrical Power Research Institute Bill Naughton Exelon Neil Todreas ** Massachusetts Institute of Technology * Resigned, July 2002 ** Co-chair GRNS Recruited Working Group Co-Chairs Jack Devine TWG-1 Water Cooled Phil Hildebrandt TWG-2 Gas Cooled Steve Rosen TWG-3 Metal Cooled Bill Rasin

33

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP)  

E-Print Network (OSTI)

This report is a summary of the renewable energy projects installed throughout Texas after the year 2000. The collection of these projects was done in response to the Energy System Laboratorys requirement to fulfill its obligations for Senate Bill 5 (SB5). The renewable energy projects researched and presented herein include: solar photovoltaic, solar thermal, hydroelectric, geothermal, and landfill gas-fired power plants. However, information on wind energy farms has been omitted in this report due to the fact that a more complete ESL report on this subject has already been prepared, ESL-TR-06-08-01. In addition to locating these projects, SB5 required the calculation of reduced NOx emissions. To accomplish this, the Energy Systems Laboratory (ESL) at Texas A&M University developed eCalc in 2004 -- a web-based Emissions Reduction Calculator. This program is able to calculate weather-normalized NOx emissions estimates for energy efficiency and renewable sources projects, such as solar photovoltaic, solar thermal, and wind. Annual energy savings from renewable projects resulted in the following: Solar photovoltaic projects resulted in energy savings of 424.18 MWh/yr and a reduction of 0.28 tons of NOx/year. Solar thermal projects resulted in energy savings of 332.88 MWh/yr and a reduction of 0.26 tons of NOx/year. The peak ozone season day (OSD) NOx reductions were calculated to be: Solar photovoltaic projects resulted in savings of 1.29 MWh/day. Solar thermal projects resulted in savings equivalent to 0.94 MWh/day. The emissions reduction values for hydroelectric and geothermal projects are not presented here since there is no methodology in place at this time to obtain these values.

Baltazar-Cervantes, J. C.; Haberl, J. S.; Ramirez, E. J.; Champeau, K.

2007-07-01T23:59:59.000Z

34

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume III--Technical Appendix  

E-Print Network (OSTI)

The Energy Systems Laboratory (Laboratory), at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its seventh annual report, Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan to the Texas Commission on Environmental Quality. The report is organized in three volumes: Volume I Summary Report provides an executive summary and overview; Volume II Technical Report provides a detailed report of activities, methodologies and findings; Volume III Technical Appendix contains detailed data from simulations for each of the counties included in the analysis.

Haberl, Jeff; Culp, Charles; Yazdani, Bahman; Gilman, Don; Muns, Shirley; Liu, Zi; Baltazar-Cervantes, Juan-Carlos; Mukhopadhyay, Jaya; Degelman, Larry; Claridge, David

2009-12-01T23:59:59.000Z

35

Shifts & Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Shifts & Schedules This page provides links to the various shifts and schedules that are used by the User ESH Support Group. FC Shift Schedule This page lists the current Operational Shift Schedule for the Floor Coordinators. FC DOR Schedule This page lists the current DOR Schedule for the Floor Coordinators. FC Off Shift Pager Schedule This tool lists the current schedule for the Floor Coordinator carring the 0101 during APS Shutdown periods. Long Range Operations Schedule This page lists the schedule of Operations for the current APS fiscal year. Machine Studies Schedule This page lists the current schedule of Operations for the Accelerator Systems during Machine Studies. PSS Validation Schedule This page lists the beamlines currently scheduled to have their Personnel Safety Systems validated.

36

Maintenance scheduling for modular systems-models and algorithms  

E-Print Network (OSTI)

Maintenance scheduling is an integral part of many complex systems. For instance, without effective maintenance scheduling, the combined effects of preventative and corrective maintenance can have severe impacts on the ...

Zarybnisky, Eric J. (Eric Jack), 1979-

2011-01-01T23:59:59.000Z

37

Pilot Evaluation of the Impact of Chloride on Selective Catalytic Reduction (SCR) Mercury Oxidation  

Science Conference Proceedings (OSTI)

This study investigated the effect of blending Powder River Basin (PRB) coal with an Eastern bituminous coal on the speciation of Hg across a selective catalytic reduction (SCR) catalyst. A pilot-scale coal combustor equipped with an SCR reactor for NOx control was used to evaluate the effect of coal blending on improving Hg oxidation across an SCR catalyst. Several parameters such as the ratio of PRB/bituminous coal blend and the concentrations of hydrogen halides (HCl, HBr, and HF) and halogens (Cl2 an...

2008-03-19T23:59:59.000Z

38

Impacts of Texas Lignite on Selective Catalytic Reduction System Life and Performance  

Science Conference Proceedings (OSTI)

Selective catalytic reduction (SCR) systems for NOx control are being broadly applied to U.S. power generating units fired with western subbituminous and eastern bituminous coals and natural gas. Prior to 2010, no power generating units firing Texas lignite were equipped with SCR. To develop an understanding of the potential deactivation and erosion of SCR catalyst by Texas lignite, a pilot-scale SCR reactor was used in a two-phase program at the Sandow Station, located near Rockdale, Texas. The test pro...

2010-09-06T23:59:59.000Z

39

Impacts of Texas Lignite on Selective Catalytic Reduction System Life and Performance  

Science Conference Proceedings (OSTI)

Selective catalytic reduction (SCR) systems for NOx control are being broadly applied to U.S. power generating units fired with western subbituminous and eastern bituminous coals and natural gas. To date, no power generating units firing Texas lignite are equipped with SCR. To develop an understanding of the potential deactivation and erosion of SCR catalyst by Texas lignite, a pilot-scale SCR reactor was used in a one-year program to test a plate-type catalyst at the Sandow Station, located near Rockdal...

2009-06-30T23:59:59.000Z

40

Disposition Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Schedules. Approved Site-Specific Records Schedules - provides a listing of approved organizational site-specific schedules. Site-specific schedules apply to records...

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Exposure Reduction Through Optimized Planning and Scheduling  

Science Conference Proceedings (OSTI)

The industry is challenged with increasing material inspections and complex maintenance work in areas with high radiation fields. Compounding this problem is the drive to reduce worker exposure. Efficient job planning and monitoring of worker exposure becomes more important in light of these challenges. An essential component of the ALARA program is centered on accurate and detailed work control. Drawing on industry experience, best practices, and the experience of the EPRI ALARA assessment team, EPRI de...

2005-12-14T23:59:59.000Z

42

Power and energy-aware processor scheduling  

Science Conference Proceedings (OSTI)

Power consumption is a critical consideration in high computing systems. We propose a novel job scheduler that optimizes power and energy consumed by clusters when running parallel benchmarks with minimal impact on performance. We construct accurate ...

Luigi Brochard; Raj Panda; Don DeSota; Francois Thomas; Robert H. Bell, Jr.

2011-03-01T23:59:59.000Z

43

Allocation Reductions  

NLE Websites -- All DOE Office Websites (Extended Search)

Allocation Allocation Reductions Quarterly Allocation Reductions MPP (or computational) repositories that haven't used significant amounts of time are adjusted at certain times by transferring a part of the unused balance to the corresponding DOE Office reserve. The following schedule will be used for allocation year 2014 (which runs 14 January 2014 through 132January 2015). On April 9: if usage is less than 10% remove 25% of the unused balance On July 9: if usage is less than 25% remove 25% of the unused balance if usage is less than 10% remove 50% of the unused balance On October 8: if usage is less than 50% remove 25% of the unused balance if usage is less than 25% remove 75% of the unused balance if usage is less than 10% remove 90% of the unused balance On November 5:

44

Dedicated heterogeneous node scheduling including backfill scheduling  

DOE Patents (OSTI)

A method and system for job backfill scheduling dedicated heterogeneous nodes in a multi-node computing environment. Heterogeneous nodes are grouped into homogeneous node sub-pools. For each sub-pool, a free node schedule (FNS) is created so that the number of to chart the free nodes over time. For each prioritized job, using the FNS of sub-pools having nodes useable by a particular job, to determine the earliest time range (ETR) capable of running the job. Once determined for a particular job, scheduling the job to run in that ETR. If the ETR determined for a lower priority job (LPJ) has a start time earlier than a higher priority job (HPJ), then the LPJ is scheduled in that ETR if it would not disturb the anticipated start times of any HPJ previously scheduled for a future time. Thus, efficient utilization and throughput of such computing environments may be increased by utilizing resources otherwise remaining idle.

Wood, Robert R. (Livermore, CA); Eckert, Philip D. (Livermore, CA); Hommes, Gregg (Pleasanton, CA)

2006-07-25T23:59:59.000Z

45

Building Technologies Office: Schedule Setting  

NLE Websites -- All DOE Office Websites (Extended Search)

Schedule Setting on Twitter Bookmark Building Technologies Office: Schedule Setting on Google Bookmark Building Technologies Office: Schedule Setting on Delicious Rank Building...

46

Professional Skills Schedule  

Energy.gov (U.S. Department of Energy (DOE))

The 2013 Professional Skills Program Training Schedule lists all courses that are offered to DOE program offices, field sites, and national laboratories. (Schedule is updated on a quarterly basis)

47

SCHEDULE: a hypercube implementation  

Science Conference Proceedings (OSTI)

SCHEDULE, a tool for developing portable parallel Fortran programs, was converted for use on the Ncube hypercube. Developed at Argonne National Laboratory by Dongarra and Sorensen, SCHEDULE was originally intended for a shared memory system such as the ...

A. L. Beguelin

1988-01-01T23:59:59.000Z

48

Cars on a diet : the material and energy impacts of passenger vehicle weight reduction in the U.S.  

E-Print Network (OSTI)

Vehicle weight reduction is a known strategy to address growing concerns about greenhouse gas emissions and fuel use by passenger vehicles. We find that every 10% reduction in vehicle weight can cut fuel consumption by ...

Cheah, Lynette W. (Lynette Wan Ting)

2010-01-01T23:59:59.000Z

49

Progress Report Schedule  

COMPANY PROPRIETARY INFORMATION 1 PROGRESS REPORT (Before First Commercial Sale) Progress Report Schedule Due date For period

50

APCF Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

APCF APCF Past APCF Memoranda APCF, Construction Schedule This is a tentative schedule of the daily construction at APCF. For the preliminary two to three week look ahead schedule, please click the PDF calendar to the left. The potential for ground vibration is noted in the "Impact" column (None, Small, Moderate, High, Very High). Daily schedule for dates up to 01.17.2014 Day Activity Impact Monday - 08.05.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Site Grading Low Tuesday - 08.06.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Landscaping Low Wednesday - 08.07.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Landscaping Low Thursday - 08.08.13 Studs and Drywall None Ceiling Piping None Curtain Wall None

51

Search Search Strategies for Scheduling Constraint-based Scheduling  

E-Print Network (OSTI)

Search Search Strategies for Scheduling Constraint-based Scheduling: Search Strategies Hana Rudová-based Scheduling: Search Strategies 1/10 #12;Search Search Strategies for Scheduling Outline 1 Search 2 Search Strategies for Scheduling Constraint-based Scheduling: Search Strategies 2/10 #12;Search Search Strategies

Qu, Rong

52

Task network-based project dynamic scheduling and schedule coordination  

Science Conference Proceedings (OSTI)

The resource-constrained project scheduling problem (RCPSP) is an extensively explored area. The existing RCPSP solutions tend to focus on single project scheduling problems without practical supports to address complex constraints, dynamic environments, ... Keywords: Aircraft maintenance management, Dynamic scheduling, Multi-project scheduling, Resource-constrained project scheduling problem (RCPSP), Schedule coordination

Qi Hao; Weiming Shen; Yunjiao Xue; Shuying Wang

2010-11-01T23:59:59.000Z

53

Energy-cost-aware scheduling of HPC workloads  

Science Conference Proceedings (OSTI)

Job submission in high performance computing workloads exhibits a diurnal pattern similar to electrical prices. While high-priority jobs may need immediate access to resources, by altering the cluster scheduler to delay the execution of lower-priority ... Keywords: electricity cost saving, energy-cost-aware scheduling, HPC workload, high performance computing workloads, high-priority jobs, resource access, cluster scheduler, power price, power demand reduction, energy availability, carbon footprint, electrical grid, electrical pricing, environmentally friendly renewable energy source, electrical grid

D. Aikema; C. Kiddle; R. Simmonds

2011-06-01T23:59:59.000Z

54

Chemistry Department Seminar Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Chemistry Department Seminar Schedule Hamilton Seminar Room, Bldg. 555 This page shows future Chemistry Department seminars and those that have taken place within the past six...

55

Rate Schedule CPP-2  

NLE Websites -- All DOE Office Websites (Extended Search)

or rate schedule accepted or approved by the Federal Energy Regulatory Commission (FERC) or other regulatory bodies will be passed on to each relevant customer. The FERC's or...

56

Berkeley Lab Holiday Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Subscribe to the Berkeley Lab Holiday Schedule via Google Calendar or ICS. Go here for Google CalendarICS subscription help. The Laboratory has announced the following holiday...

57

Essays on the U.S Biofuel Policies: Welfare Impacts and the Potential for Reduction of GHG Emission.  

E-Print Network (OSTI)

??This dissertation study investigates the impact of the US biofuel policies related to greenhouse gas (GHG) emission regulation, tax credit and renewable fuel standard (RFS2) (more)

Wamisho Hossiso, Kassu

2012-01-01T23:59:59.000Z

58

ADMINISTRATIVE RECORDS SCHEDULE 23:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES June 2007 Revision 1 This schedule provides for the disposal of certain records common to most offices. It covers administrative subject files; facilitative records such as suspense files, tracking and control records, calendars, and indexes; and documents of transitory value. This schedule does not apply to any materials determined to be non-record or to materials such as calendars or work schedules claimed as personal. Office Administrative Files described under item 1 are records retained by an originating office as its record of initiation of an action, request, or response to requests for information. This item may be applied only to separate administrative files containing such records as copies of

59

Definition: Dynamic Interchange Schedule Or Dynamic Schedule | Open Energy  

Open Energy Info (EERE)

Schedule Or Dynamic Schedule Schedule Or Dynamic Schedule Jump to: navigation, search Dictionary.png Dynamic Interchange Schedule Or Dynamic Schedule A telemetered reading or value that is updated in real time and used as a schedule in the AGC/ACE equation and the integrated value of which is treated as a schedule for interchange accounting purposes. Commonly used for scheduling jointly owned generation to or from another Balancing Authority Area.[1] Related Terms balancing authority, balancing authority area, smart grid References ↑ Glossary of Terms Used in Reliability Standards An in LikeLike UnlikeLike You like this.Sign Up to see what your friends like. line Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Dynamic_Interchange_Schedule_Or_Dynamic_Schedule&oldid=502492

60

ADMINISTRATIVE RECORDS SCHEDULE 22:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADMINISTRATIVE RECORDS SCHEDULE 22: ADMINISTRATIVE RECORDS SCHEDULE 22: AUDIT/INVESTIGATIVE RECORDS June 2007 Revision 1 Section I of this schedule covers records associated with investigations other than those performed by the Office of the Inspector General (OIG). Types of investigations may include: routine and significant internal program investigations, specific purpose investigations, audits, inspections, appraisals, and management reviews. Investigations may be described or referred to as audits, appraisals, surveillance, self-assessments, management assessments, or evaluations. Investigations may be conducted by DOE or by its contractors. Section II covers records created by the Department's OIG investigations. OIG investigations serve to prevent or reduce waste and fraud in Departmental programs,

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

ADMINISTRATIVE RECORDS SCHEDULE 16:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 ADMINISTRATIVE RECORDS SCHEDULE 16: ADMINISTRATIVE MANAGEMENT RECORDS June 2007 Revision 1 This schedule covers those administrative management activities not covered by other Administrative Schedules. Included are disposable records created in the course of organizational planning, development, and simplification of procedures; records management activities; and administration of management improvement programs. See ADM 1 (items 12 and 13) for the disposition of case files on individuals involved in incentive award and similar types of management improvement programs. The organizational locations and titles of administrative management units vary. They may be scattered at numerous levels or locations, or may be centralized. For the purposes

62

ADMINISTRATIVE RECORDS SCHEDULE 11:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADMINISTRATIVE RECORDS SCHEDULE 11: ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS June 2007 Revision 1 This schedule provides for the disposal of all copies, wherever located in the Department, of records relating to space and maintenance, except as indicated below. Records documenting these functions pertain to the acquisition, allocation, utilization, and release of space and include related correspondence and reports submitted to the General Services Administration (or equivalent agency with similar Government-wide responsibilities) as directed by law and regulation (41 CFR 101-17); correspondence and forms relating to the compilation of directory service listings; identification credentials and related accountable records; requests for building and equipment services;

63

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP) Preliminary Report: Integrated NOx Emissions Savings from EE/RE Programs Statewide  

E-Print Network (OSTI)

The Energy Systems Laboratory (Laboratory), at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its eighth annual report, Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan to the Texas Commission on Environmental Quality. The report is organized in three volumes: Volume I Summary Report provides an executive summary and overview; Volume II Technical Report provides a detailed report of activities, methodologies and findings; Volume III Technical Appendix contains detailed data from simulations for each of the counties included in the analysis.

Haberl, J.; Culp, C.; Yazdani, B.; Gilman, D.; Baltazar, J. C.; Lewis, C.; McKelvey, K.; Mukhopadhyay, J.; Degelman, L.; Liu, Z.

2010-07-01T23:59:59.000Z

64

ADMINISTRATIVE RECORDS SCHEDULE 21:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS June 2007 Revision 1 This schedule covers audiovisual and related records created by or for Department and those acquired in the normal course of business. For audiovisual records that are not described in this schedule, an SF 115, Request for Records Disposition Authority, must be submitted to the National Archives and Records Administration (NARA). Audiovisual records include still and motion picture photography, graphic materials, and sound and video recordings. Related documentation includes (1) production files or other files documenting the creation, justification, ownership, and rights to the records and (2) finding aids used to identify or access the records. This schedule does not cover: (1) cartographic records, (2) remote sensing imagery

65

Schedule - Table 1  

Science Conference Proceedings (OSTI)

... 41, 5:00 PM, 42, 6:00 PM, Banquet, 43, 44, You can add more information about your conference or training session in the space below the schedule ...

2008-05-20T23:59:59.000Z

66

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Preliminary Report: Integrated NOx Emissions Savings from EE/RE Programs Statewide  

E-Print Network (OSTI)

The Energy Systems Laboratory (ESL), at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits this sixth annual report, Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan (Preliminary Report) to the Texas Commission on Environmental Quality. In this preliminary report the NOx emissions savings from the energy-efficiency programs from multiple Texas State Agencies working under Senate Bill 5 and Senate Bill 7 in a uniform format to allow the TECQ to consider the combined savings for Texas State Implementation Plan (SIP) planning purposes. This required that the analysis should include the cumulative savings estimates from all projects projected through 2020 for both the annual and Ozone Season Day (OSD) NOx reductions. The NOx emissions reduction from all these programs were calculated using estimated emissions factors for 2007 from the US Environmental Protection Agency (US EPA) eGRID database, which had been specially prepared for this purpose. In 2007 the cumulative total annual electricity savings from all programs is 12,591,561 MWh/yr (8,326 tons-NOx/year). The total cumulative OSD electricity savings from all programs is 37,421 MWh/day, which would be a 1,559 MW average hourly load reduction during the OSD period (25.05 tons-NOx/day). By 2013 the total cumulative annual electricity savings from will be 28,802,074 MWh/year (18,723 tons-NOx/year). The total cumulative OSD electricity savings from all programs will be 88,560 MWh/day, which would be 3,690 MW average hourly load reduction during the OSD period (58.47 tons-NOx/day).

Degelman, L.; Mukhopadhyay, J.; McKelvey, K.; Montgomery, C.; Baltazar-Cervantes, J. C.; Liu, Z.; Gilman, D.; Culp, C.; Yazdani, B.; Haberl, J. S.

2008-08-29T23:59:59.000Z

67

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Vol. I - Summary Report  

E-Print Network (OSTI)

The TERP legislation adopted the energy efficiency provisions of the International Residential Code (IRC) and the International Energy Conservation Code (IECC) for residential, commercial and industrial buildings. Under the TERP legislation, the Energy Systems Laboratory (Laboratory) at the Texas Engineering Experiment Station of the Texas A&M University System must determine the energy savings from energy code adoption and, when applicable, from more stringent local codes or above-code performance ratings and must report these reductions annually to the TCEQ.

Degelman, L. O.; Gilman, D.; Ahmed, M.; Yazdani, B.; Liu, Z.; Verdict, M.; Muns, S.; Baltazar-Cervantes, J. C.; Turner, W. D.; Haberl, J. S.; Culp, C.

2006-10-30T23:59:59.000Z

68

Optimal investment and scheduling of distributed energy resources with  

NLE Websites -- All DOE Office Websites (Extended Search)

investment and scheduling of distributed energy resources with investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules Title Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules Publication Type Journal Article LBNL Report Number LBNL-6471E Year of Publication 2013 Authors Cardoso, Gonçalo, Michael Stadler, Mohammad Bozchalui, Ratnesh Sharma, Chris Marnay, Ana Barbosa-Póvoa, and Paulo Ferrão Journal Energy Date Published 10/2013 Abstract The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

69

DOWNSTREAM IMPACTS OF SLUDGE MASS REDUCTION VIA ALUMINUM DISSOLUTION ON DWPF PROCESSING OF SAVANNAH RIVER SITE HIGH LEVEL WASTE - 9382  

Science Conference Proceedings (OSTI)

The SRS sludge that was to become a major fraction of Sludge Batch 5 (SB5) for the Defense Waste Processing Facility (DWPF) contained a large fraction of H-Modified PUREX (HM) sludge, containing a large fraction of aluminum compounds that could adversely impact the processing and increase the vitrified waste volume. It is beneficial to reduce the non-radioactive fraction of the sludge to minimize the number of glass waste canisters that must be sent to a Federal Repository. Removal of aluminum compounds, such as boehmite and gibbsite, from sludge can be performed with the addition of NaOH solution and heating the sludge for several days. Preparation of SB5 involved adding sodium hydroxide directly to the waste tank and heating the contents to a moderate temperature through slurry pump operation to remove a fraction of this aluminum. The Savannah River National Laboratory (SRNL) was tasked with demonstrating this process on actual tank waste sludge in our Shielded Cells Facility. This paper evaluates some of the impacts of aluminum dissolution on sludge washing and DWPF processing by comparing sludge processing with and without aluminum dissolution. It was necessary to demonstrate these steps to ensure that the aluminum removal process would not adversely impact the chemical and physical properties of the sludge which could result in slower processing or process upsets in the DWPF.

Pareizs, J; Cj Bannochie, C; Michael Hay, M; Daniel McCabe, D

2009-01-14T23:59:59.000Z

70

CASP: a community-aware scheduling protocol  

Science Conference Proceedings (OSTI)

The existing resource and topology heterogeneity has divided the scheduling solutions into local schedulers and high-level schedulers (a.k.a. meta-schedulers). Although much work has been proposed to optimise job queue based scheduling, ...

Ye Huang; Nik Bessis; Pierre Kuonen; Beat Hirsbrunner

2011-05-01T23:59:59.000Z

71

Performance evaluation of scheduling in IEEE 802.16 based wireless mesh networks  

Science Conference Proceedings (OSTI)

IEEE 802.16 employs TDMA (Time Division Multiple Access) as the access method and the policy for selecting scheduled links in a given time slot will definitely impact the system performance. We propose a collision-free centralized scheduling algorithm ... Keywords: IEEE 802.16, Link scheduling, Relay model, Wireless access networks, Wireless mesh networks

Bo Han; Weijia Jia; Lidong Lin

2007-02-01T23:59:59.000Z

72

JGI - CSP Proposal Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Schedule Proposal Schedule CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | FAQ Small-scale Microbial/Metagenome Proposals - reviewed twice yearly Small-scale proposals for specific types of microbial and metagenome projects are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for submission is 60 days prior to the review date. Next review dates (submission deadline in parentheses): January 2014 (Nov 22, 2013) July 2014 (May 23, 2014) Submit small-scale microbial/metagenome proposals anytime using the Work Initiation Process (WIP) interface. Synthetic Biology proposals Synthetic biology proposals are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for

73

SRS CAB - Meeting Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

SRS CAB Meeting Schedule SRS CAB Meeting Schedule Savannah River Site - Citizens Advisory Board 2013 Schedule To join current Online Meetings or view archived Online Meetings click on the buttons in the right-hand column. CAB Full Board and Combined Committees Meetings are not presented in the Online Meeting format. Instructions for Accessing Committee Meetings Online To request a copy of an archived online meeting, scroll down to the date of the meeting you wish to request, and click on the green "Request Archived Online Meeting" button. Your email browser will open and generate a new email to srscitizensadvisoryboard@srs.gov with the committee meeting you wish to request in the subject line. Please, include your name and mailing address in the body of the email. Once we receive the email, we will send

74

NERSC Holiday Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

NERSC NERSC Holiday Schedule NERSC Holiday Schedule December 20, 2013 by Francesca Verdier (0 Comments) All NERSC computing and storage systems will remain in full operation throughout the holiday season (Tuesday December 24 through Wednesday January 1). From Tuesday December 24 through Wednesday January 1, NERSC Consulting and Account Support services will be available *only* on Friday December 27 and Monday December 30, from 8:00 to 5:00 Pacific Time. Normal Consulting and Account Support schedules will resume on Thursday, January 2. As always, critical system problems may be reported at any time to NERSC Operations at 1-800-666-3772, menu option 1, or 1-510-486-6821. You should also contact Operations if you need to have your password reset (or login failures cleared) over the holidays.

75

ADMINISTRATIVE RECORDS SCHEDULE 20:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20: 20: ELECTRONIC RECORDS April 2008 Revision 2 This schedule authorizes the disposition of specified electronic records and hard-copy or microform records and are integrally related to them. The electronic records may either be created or received. Included are records created by computer operators, programmers, analysts, systems administrators, and all personnel with access to a computer. Disposition authority is provided for certain master files, including some tables that are components of data base management systems, and certain files created from master files for specific purposes. In addition, this schedule covers certain disposable electronic records produced by end users in office automation applications. These disposition authorities apply to the

76

GENERAL RECORDS SCHEDULE 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

39 39 DEPARTMENT OF ENERGY ADMIN1STRATIVE RECORDS SCHEDULE 1: PERSONNEL RECORDS June 2007 Revision 2 As do all Administrative Records Schedules (ADMs), ADM-1 covers records of the Department and its contractors. The records include, employee concerns programs, labor agreements and negotiations, labor relations, academic and outreach programs, apprenticeship programs, job vacancies, unemployment compensation, recruitment and employee health. The most important types of records are the Official Personnel Folders, the Service Record Cards, and the Employee Medical Folders. Those for Federal employees are maintained according to The Guide to Personnel Recordkeeping, an Office of Personnel Management directive that prescribes a system of recordkeeping for Federal

77

Fission Product Impact Reduction via Protracted In-core Retention in Very High Temperature Reactor (VHTR) Transmutation Scenarios  

E-Print Network (OSTI)

The closure of the nuclear fuel cycle is a topic of interest in the sustainability context of nuclear energy. The implication of such closure includes considerations of nuclear waste management. This originates from the fact that a closed fuel cycle requires recycling of useful materials from spent nuclear fuel and discarding of non-usable streams of the spent fuel, which are predominantly the fission products. The fission products represent the near-term concerns associated with final geological repositories for the waste stream. Long-lived fission products also contribute to the long-term concerns associated with such repository. In addition, an ultimately closed nuclear fuel cycle in which all actinides from spent nuclear fuels are incinerated will result in fission products being the only source of radiotoxicity. Hence, it is desired to develop a transmutation strategy that will achieve reduction in the inventory and radiological parameters of significant fission products within a reasonably short time. In this dissertation, a transmutation strategy involving the use of the VHTR is developed. A set of specialized metrics is developed and applied to evaluate performance characteristics. The transmutation strategy considers six major fission products: 90Sr, 93Zr, 99Tc, 129I, 135Cs and 137Cs. In this approach, the unique core features of VHTRs operating in equilibrium fuel cycle mode of 405 effective full power days are used for transmutation of the selected fission products. A 30 year irradiation period with 10 post-irradiation cooling is assumed. The strategy assumes no separation of each nuclide from its corresponding material stream in the VHTR fuel cycle. The optimum locations in the VHTR core cavity leading to maximized transmutation of each selected nuclides are determined. The fission product transmutation scenarios are simulated with MCNP and ORIGEN-S. The results indicate that the developed fission product transmutation strategy offers an excellent potential approach for the reduction of inventories and radiological parameters, particularly for long-lived fission products (93Zr, 99Tc, 129I and 135Cs). It has been determined that the in-core transmutation of relatively short-lived fission products (90Sr and 137Cs) has minimal advantage over a decay-only scenario for these nuclides. It is concluded that the developed strategy is a viable option for the reduction of radiotoxicity contributions of the selected fission products prior to their final disposal in a geological repository. Even in the cases where the transmutation advantage is minimal, it is deemed that the improvement gained, coupled with the virtual storage provided for the fission products during the irradiation period, makes the developed fission product transmutation strategy advantageous in the spent fuel management scenarios. Combined with the in-core incineration options for TRU, the developed transmutation strategy leads to potential achievability of engineering time scales in the comprehensive nuclear waste management.

Alajo, Ayodeji Babatunde

2010-05-01T23:59:59.000Z

78

DOE Surpasses Cleanup Target Ahead of Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Surpasses Cleanup Target Ahead of Schedule Surpasses Cleanup Target Ahead of Schedule DOE Surpasses Cleanup Target Ahead of Schedule May 12, 2011 - 12:00am Addthis WASHINGTON, D.C. - The U.S. Department of Energy announced today it has surpassed one of the Obama Administration's High Priority Performance Goals five months ahead of schedule in its effort to clean up the legacy of the Cold War. Through a $6 billion American Recovery and Reinvestment Act investment, the Department's cleanup footprint has been reduced by 45 percent, from 931 square miles to 516 square miles. By achieving this reduction, the Department is on track to reduce its overall cleanup footprint by approximately 90 percent by 2015. Footprint reduction lowers costs associated with site surveillance and maintenance and helps protect the

79

PIA - Richland Health Services Scheduling | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Health Services Scheduling PIA - Richland Health Services Scheduling PIA - Richland Health Services Scheduling PIA - Richland Health Services Scheduling More Documents &...

80

Schedule of Events pdf  

Science Conference Proceedings (OSTI)

Schedule of Events Day Start Time End Time Short Course Saturday 8:00 AM 5:00 PM Short Courses Sunday 8:00 AM 5:00 PM Tocotrienols Symposia Sunday 8:00 AM 5:00 PM Registration Sunday 10:00 AM 7:30 PM AOCS Pavilion Sunday 10:00 AM 7:

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Wireless Scheduling Mung Chiang  

E-Print Network (OSTI)

Wireless Scheduling Mung Chiang Electrical Engineering, Princeton University WiOpt Seoul, Korea 2005, Neely Modiano Li 2005, Eryilmaz Srikant 2005, Stolyar 2005, Chen Low Chiang Doyle 2006... · Saturated Joint congestion control and contention control: Wang Kar 2005, Lee Chiang Calderbank 2006, Zhang

Chiang, Mung

82

PARS II Training Schedule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 4 5 6 7 8 WEEK 3 11 12 13 14 15 WEEK 4 18 19 20 21 22 WEEK 5 25 26 27 28 PARS II Training Schedule FEBRUARY 2013 Webinar PARS 102: Session A) 10:00 - 12:00 1 Hour Break...

83

Building Technologies Office: Plans and Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

and Schedules on Twitter Bookmark Building Technologies Office: Plans and Schedules on Google Bookmark Building Technologies Office: Plans and Schedules on Delicious Rank Building...

84

Building Technologies Office: Plans and Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Plans and Schedules The Appliances and Equipment Standards program maintains a multi-year rulemaking schedule. The currently scheduled rulemaking activities are described in the...

85

Survey Research on gain scheduling  

Science Conference Proceedings (OSTI)

Current research on gain scheduling is clarifying customary practices as well as devising new approaches and methods for the design of nonlinear control systems. Keywords: Gain scheduling, Linear parameter-varying systems, Nonlinear control systems

Wilson J. Rugh; Jeff S. Shamma

2000-10-01T23:59:59.000Z

86

EDF Scheduling Identical Multiprocessor Systems  

E-Print Network (OSTI)

-plate Nuclear Reactor STOP !!! Year Power density (W/cm2) P V f: Clock speed limited to less than 4 GHz #12;June Systems Solid theory (starting from the 70s) Optimal schedulers Tight schedulability tests for different

Navet, Nicolas

87

HSO SPOTLIGHT No 01 2012 HSO Meeting Schedule for 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

HSO SPOTLIGHT No. 01-2012: 2012 Schedule of Quarterly HSO Meetings HSO SPOTLIGHT No. 01-2012: 2012 Schedule of Quarterly HSO Meetings What is the issue? Meeting and Training Schedule Why do we need this? Informational Who is impacted? HSOs What does the HSO need to do? This is an informational Spotlight only NOTICE: The information in all HSO Spotlights applies only at Department of Energy (DOE) Headquarters facilities in the Washington, DC area. They are not intended to apply at DOE field sites, which may have entirely different local procedures. The HSO Program Manager has established the schedule below for quarterly HSO meetings in 2012. Please note that the topics listed are subject to change. HSO Quarterly Meeting and Training Schedule 2011 10:00 to Noon each day FORS Date / Room

88

Wireless scheduling with power control  

Science Conference Proceedings (OSTI)

We consider the scheduling of arbitrary wireless links in the physical model of interference to minimize the time for satisfying all requests. We study here the combined problem of scheduling and power control, where we seek both an assignment of power ... Keywords: Wireless networks, capacity, radio interference, scheduling

Magns M. Halldrsson

2012-12-01T23:59:59.000Z

89

ADMINISTRATIVE RECORDS SCHEDULE 14:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS June 2007 Revision 1 This schedule covers certain records pertaining to informational services performed by the Department in their day-to-day affairs and in their relations with the public, including records created in administering Freedom of Information Act (FOIA) and Privacy Act ) programs. Except as otherwise specified in individual items, it applies to copies of these records wherever located. Item 4 applies only to files maintained in office responsible for the operation of the information activities. Items 11 through 15 describe the files accumulated in carrying out the provisions of the FOIA, and items 21 through 26 describe the files created in administering the provisions of the Privacy Act. Items 31

90

BNL | ATF Beam Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Beam Schedule (pdf) Beam Schedule (pdf) Sunday Monday Tuesday Wednesday Thursday Friday Saturday 22 1/2 Holiday Holiday 28 January Holiday 4 5 Maintenance 11 12 Maintenance 18 19 Holiday AE52 - DWFA (Euclid), BL2 25 February AE52 - DWFA (Euclid), BL2 1 2 AE50 - PWFA in QNR (UCLA), BL2 8 9 AE50 - PWFA in QNR (UCLA), BL2 15 16 Holiday AE50 - PWFA in QNR (UCLA), BL2 22 March 1 2 AE53 - Nonlinear Compton (UCLA) 8 9 AE53 - Nonlinear Compton (UCLA) 15 16 AE53 - Nonlinear Compton (UCLA) 22 23 29 Sunday Monday Tuesday Wednesday Thursday Friday Saturday User operations (E-beam in use) Ions - Ion generation User operations (laser in use) PWFA - Plasma Wakefield Acceleration User operations (E-beam and laser in use)

91

DOE/EA-1472: Finding of No Significant Impact for the Commercial Demonstration of the Low NOx Burner/Separated Over-Fire Air Integration System Emission Reduction Technology (03/11/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IMPACT IMPACT COMMERCIAL DEMONSRATION OF THE LOW NOx BURNER/SEPARATED OVER- FIRE AIR (LNB/SOFA) INTEGRATON SYSTEM EMISSION REDUCTION TECHNOLOGY HOLCOMB STATION SUNFLOWER ELECTRIC POWER CORPORATION FINNEY COUNTY, KANSAS AGENCY: U.S. Department of Energy (DOE) ACTION: Finding of No Significant Impact (FONSI) SUMMARY: The DOE has prepared an Environmental Assessment (EA), to analyze the potential impacts of the commercial application of the Low-NOx Burner/Separated Over-Fire Air (LNB/SOFA) integration system to achieve nitrogen oxide (NOx) emissions reduction at Sunflower's Holcomb Unit No. 1 (Holcomb Station), located near Garden City, in Finney County, Kansas. The Holcomb Station would be modified in three distinct phases to demonstrate the synergistic effect of layering NO,

92

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Shutdown Planning Shutdown Planning Planning Templates Shutdown Planning Schedules: Current Shutdown Schedule Archives: 2006 - 2013 APS Long-Range Operations Schedule: 2014 Archives: 2013 | 2012 2011 | 2010 | 2009 | 2008 2007 | 2006 | 2005 | 2004 2003 | 2002 | 2001 | 2000 1999 | 1998 | 1997 | 1996 APS Long-Range Operations Schedule (Fiscal Year 2014) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2013-3 2014-1 2014-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2

93

Green-aware workload scheduling in geographically distributed data centers  

Science Conference Proceedings (OSTI)

Renewable (or green) energy, such as solar or wind, has at least partially powered data centers to reduce the environmental impact of traditional energy sources (brown energy with high carbon footprint). In this paper, we propose a holistic workload ... Keywords: Green products,Cooling,Energy consumption,Optimization,Scheduling algorithms,Distributed databases,geographically distributed data centers,Green data centers,renewable energy,workload,scheduling

Xueyan Tang, Changbing Chen, Bingsheng He

2012-12-01T23:59:59.000Z

94

Disposition Schedule: Human Radiation Experiments | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Schedule: Human Radiation Experiments Disposition Schedule: Human Radiation Experiments This database contains information on records collections related to human radiation...

95

DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act Investment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act Investment Saves Money, Trains Workers, Creates Jobs DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act Investment Saves Money, Trains Workers, Creates Jobs May 12, 2011 - 12:00pm Addthis Media Contact (202) 586-4940 WASHINGTON, D.C. - The U.S. Department of Energy announced today it has surpassed one of the Obama Administration's High Priority Performance Goals five months ahead of schedule in its effort to clean up the legacy of the Cold War. Through a $6 billion American Recovery and Reinvestment Act investment, the Department's cleanup footprint has been reduced by 45 percent, from 931 square miles to 516 square miles. By achieving this reduction, the Department is on track to reduce its overall cleanup footprint by

96

400A Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

APCF APCF Past APCF Memoranda APCF Past Construction Past APCF Construction Day Activity Impact Monday - 10.01.12 Excavation Small Concrete Small Site Utilities Small Tuesday - 10.02.12 Excavation Small Concrete Small Site Utilities Small Wednesday - 10.03.12 Excavation Small Concrete Small Site Utilities Moderate Thursday - 10.04.12 Excavation Small Concrete Small Site Utilities Moderate Friday - 10.05.12 Excavation Small Concrete Small Site Utilities Moderate Site Utility water line hot tap Moderate Saturday - 10.06.12 No work is scheduled for the weekends -/- Sunday - 10.07.12 No work is scheduled for the weekends -/- Monday - 10.08.12 Excavation Small Concrete Small Interior underground plumbing Small Site Utilities Moderate Site Utility water line hot tap Moderate

97

Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rate Schedules Rate Schedules Rate Schedules One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate levels and these studies for each of Southeastern's four power marketing systems are updated annually. They demonstrate the adequacy of the rates for each system. Rates are considered to be adequate when revenues are sufficient to repay all costs associated with power production and transmission costs, which include the amortization of the Federal investment allocated to power. Latest Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012

98

Schedule planning for construction projects  

SciTech Connect

Operating contractors of government-owned facilities manage construction projects having a maximum value of $1,000,000. Successful execution is dependent upon pragmatic scheduling. Such scheduling requires that all activities (both engineering and non-engineering) be integrated into a compatible sequence of events with adequate time allowed for each event. To develop realistic schedules, project event standards and program measures of performance have been established.

Shunk, W.A.

1982-01-01T23:59:59.000Z

99

42498 PROFESIONAL SKILL SCHEDULE FLYER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LEARNING AND WORKFORCE DEVELOPMENT Professional Skills & Technical Training Program 3 rd , 4 th - FY 2013 & 1st Quarter FY 2014 Corporate Schedule These courses have immediate open...

100

NRC comprehensive records disposition schedule  

SciTech Connect

Title 44 United States Code, Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules.

Not Available

1992-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Construction Schedule Current Projects APCF 27-ID and 35-ID LOM438 Pentagon F LOM437 Protocol for halting construction because of vibrations 0614...

102

Sector 9 | Operations and Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Sector 9 Operations and Schedule Contents: 9-ID User Manual 9-BM User Manual Common Tasks Computers and Software Troubleshooting Web Cameras...

103

Test Access Mechanism Optimization, Test Scheduling, and Tester Data Volume  

E-Print Network (OSTI)

Test Access Mechanism Optimization, Test Scheduling, and Tester Data Volume Reduction for System Marinissen, Senior Member, IEEE Abstract--We describe an integrated framework for system-on-chip (SOC) test automation. Our framework is based on a new test access mechanism (TAM) architecture consisting of flexible

Chakrabarty, Krishnendu

104

Fuzzy possibilistic modeling and sensitivity analysis for optimal fuel gas scheduling in refinery  

Science Conference Proceedings (OSTI)

In refinery, fuel gas which is continuously generated during the production process is one of the most important energy sources. Optimal scheduling of fuel gas system helps the refinery to achieve energy cost reduction and cleaner production. However, ... Keywords: Fuel gas, Fuzzy possibilistic programming, Marginal value analysis, Refinery, Scheduling, Sensitivity analysis

J. D. Zhang; G. Rong

2010-04-01T23:59:59.000Z

105

Design of an energy consumption scheduler based on genetic algorithms in the smart grid  

Science Conference Proceedings (OSTI)

This paper designs an energy consumption scheduler capable of reducing peak power load in smart places based on genetic algorithms and measures its performance. The proposed scheme follows the task model consisting of actuation time, operation length, ... Keywords: combinatory index, genetic algorithm, peak load reduction, power consumption scheduler, smart grid

Junghoon Lee; Gyung-Leen Park; Ho-Young Kwak; Hongbeom Jeon

2011-09-01T23:59:59.000Z

106

Accurate Instruction Pre-scheduling in Dynamically Scheduled Processors  

Science Conference Proceedings (OSTI)

The role of the instruction scheduler is to supply instructions to functional units in a timely manner so as to avoid data and structural hazards. Current schedulers are based on the broadcast of result register numbers to all instructions waiting in ...

Woojin Choi; Seok-Jun Park; Michel Dubois

2009-04-01T23:59:59.000Z

107

_PART I - THE SCHEDULE  

National Nuclear Security Administration (NNSA)

15 dated 9/9/13 Contract No. DE-AC04-94AL85000 15 dated 9/9/13 Contract No. DE-AC04-94AL85000 Modification No. M202 Part I - The Schedule Sections B through H TABLE OF CONTENTS B-1 SERVICES BEING ACQUIRED ...................................................................................... 4 B-2 CONTRACT TYPE AND VALUE (Rev. M218, M222, M236, M241, M261, M266, M288, M293, M312, M319, M344, M365, M400, M404, M443, M448, M473, M484, M0512, A0514) ............................................................................................................................ 4 B-3 AVAILABILITY OF APPROPRIATED FUNDS ................................................................. 8 B-9999 AMERICAN RECOVERY AND REINVESTMENT ACT WORK VALUES (Added M331; Modified: A335, A336, A340, A341, A342, A346, A347, A348, A349, A350,

108

Structure Breakdown Workshop Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Breakdown Breakdown Workshop SLAC, Orange Room August 28 - 30 , 2000 Announcement Workshop Poster Workshop Goals: The Goal of the workshop is to review understanding of warm structure breakdown phenomena, to define common terms for comparing tests and to identify avenues for further study. For a partial bibliography, please view the following URL : http://www-project.slac.stanford.edu/lc/wkshp/RFBreakdwn/references/publist.htm Schedule and Presentations: Monday, August 28 8:30 - Operation Experience and Definition of Problem Moderator - G. Loew (initial questions) Opening remarks and introduction (C. Adolphsen) (15min) CERN Structure Operation Results (W. Wuensch) (30 min) NLCTA Structure Operation Results (C. Adolphsen) (30 min) ASTA Structure Operation Results (R. Loewen) (20 min)

109

Speaker Host Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

User Science Seminar User Science Seminar Previous Speakers User Science Seminar Host Schedule User seminar is hosted by a different XSD group leader every two weeks. If you have any suggestions for possible speakers for the following dates, please contact the appropiate group leader below. Month Host 2012 October 5 & 12, 2012 Peter Chupas October 19 & 26,2012 Jon Almer November 2 & 9,2012 Francesco Decarlo November 16, 2012 Stefan Vogt November 23, 2012 Cancelled - Thanksgiving Holiday December 7, 2012 Stefan Vogt December 14 & 21, 2012 Randy Winans December 28, 2012 Cancelled - Xmas Holiday 2013 Janurary 4-25, 2013 Cancelled - January Shutdown February 1 & 8 , 2013 Lahsen Assoufid February 15 & 22, 2013 Thomas Gog March 1 & 8, 2013 Jonathan Lang

110

schedule_2006.xls  

NLE Websites -- All DOE Office Websites (Extended Search)

6 Long Range Operations Schedule 6 Long Range Operations Schedule (October 2005 - September 2006) 1 1 1 1 → 1 1 1 4 → 1 1 1 1 1 1 2 2 4 → 2 1 → 2 2 2 4 2 2 2 2 2 1 → 2 3 3 4 3 1 → 3 3 3 4 3 3 3 3 3 1 → 3 4 4 4 4 1 → 4 4 4 4 4 4 4 4 4 1 → 4 5 5 4 5 1 → 5 5 5 4 5 5 5 5 5 1 → 5 6 6 4 6 1 6 6 6 4 6 6 6 6 6 1 → 6 7 7 4 7 1 → 7 7 7 4 7 7 7 7 7 1 → 7 8 8 4 8 1 → 8 8 8 4 → 8 8 8 8 8 1 8 9 9 9 1 → 9 9 9 4 9 9 9 9 9 1 → 9 10 10 10 1 → 10 10 10 4 10 10 10 10 10 1 → 10 11 11 11 1 → 11 11 11 4 11 11 11 11 11 1 → 11 12 12 12 1 → 12 12 12 4 12 1 → 12 12 12 4 → 12 1 → 12 13 13 13 1 13 13 13 4 13 1 → 13 13 13 4 13 1 → 13 14 14 14 5 → 14 14 14 14 1 → 14 14 14 4 14 1 → 14 15 15 15 5 15 15 15 15 1 → 15 15 15 4 15 1 15 16 16 16 5 16 16 16 16 1

111

Archives and History Office: Records Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Services > Records Schedules Services > Records Schedules Records Schedules Note: Some links on this page open pdf files, which require the free Acrobat Reader. SLAC Current Organizational Unit File Plans / Records Control Schedules For assistance in applying or developing a records schedule for your unit, please contact either the SLAC Archives and History Office (x3091 -- directorate and research records) or the SLAC Records Manager (x4342 -- business and safety records). Directorate Organizational Unit Applicable File Plans(s) / Records Control Schedule(s) Director's Office SLAC DO Schedule Advisor for Science and Technology DOE Administrative Records schedules and DOE R&D Schedule Chief Research Officer DOE Administrative Records schedules and DOE R&D Schedule Communications Office DOE Administrative Records schedules (particularly ADM14 and ADM21)

112

Preemptive Scheduling in Overloaded Systems  

Science Conference Proceedings (OSTI)

The following scheduling problem is studied: We are given a set of tasks withrelease times, deadlines, and profit rates. The objective is to determine a 1-processor preemptive schedule of the given tasks that maximizes the overall profit. In the standard ...

Marek Chrobak; Leah Epstein; John Noga; Jiri Sgall; Rob van Stee; Toms Tich; Nodari Vakhania

2002-07-01T23:59:59.000Z

113

Scheduling resources for throughput maximization  

Science Conference Proceedings (OSTI)

We consider the problem of scheduling a set of resources over time. Each resource is specified by a set of time intervals (and the associated amount of resource available), and we can choose to schedule it in one of these intervals. The goal is to maximize ...

Venkatesan T. Chakaravarthy; Amit Kumar; Vinayaka Pandit; Sambuddha Roy; Yogish Sabharwal

2011-08-01T23:59:59.000Z

114

Fall Orientation Schedule Kresge College  

E-Print Network (OSTI)

1 2011 Fall Orientation Schedule Kresge College University of California Santa Cruz September 16 - 26 60 05 1 25 30 35 40 45 50 55 Kresge College our time is now #12;#12;3 1 Orientation Week Planner your first several days on campus. This Orientation Schedule is designed to help guide you. Use

California at Santa Cruz, University of

115

Cache-Conscious Wavefront Scheduling  

Science Conference Proceedings (OSTI)

This paper studies the effects of hardware thread scheduling on cache management in GPUs. We propose Cache-Conscious Wave front Scheduling (CCWS), an adaptive hardware mechanism that makes use of a novel intra-wave front locality detector to capture ...

Timothy G. Rogers; Mike O'Connor; Tor M. Aamodt

2012-12-01T23:59:59.000Z

116

Salt Repository Project schedule integration  

SciTech Connect

The Nuclear Waste Policy Act of 1982 defined the process and schedule leading to construction of a nuclear repository available to accept commercial nuclear waste by 1998. The significance of the efforts reported in this paper are that technical staff become equally convinced of the merit of scheduling when time permits, or magnitude requires, that they be intimately involved in the scheduling process. This particular project was also unique in the variety of technical disciplines forced to interact in order to determine schedule constraints between groups. This required a strong and experienced task force to bring the groups together, promulgate the technical principles of the scheduling methodology, and distill the proper logic. Finally, it was a necessity to be end-date constrained, and this required that management mandate realistic scopes of work as well as aggressive assumptions regarding durations of certain critical path activities.

Kopp, H.D.; LaFountain, L.J. (Battelle Memorial Institute, Amarillo, TX (USA))

1988-01-01T23:59:59.000Z

117

NGFAST: a simulation model for rapid assessment of impacts of natural gas pipeline breaks and flow reductions at U.S. state borders and import points  

Science Conference Proceedings (OSTI)

This paper describes NGfast, the new simulation and impact-analysis tool developed by Argonne National Laboratory for rapid, first-stage assessments of impacts of major pipeline breaks. The methodology, calculation logic, and main assumptions are discussed. ...

Edgar C. Portante; Brian A. Craig; Stephen M. Folga

2007-12-01T23:59:59.000Z

118

LCLS Operating Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

LCLS Operating Schedule LCLS Operating Schedule August - December 2009 Ver: 2 10/30/09 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M 0000-0800 MD MD MD MD MD 0800-1600 ROD MD AMO ROD MD AMO 1600-2400 MD MD Commissioning MD MD Comm. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W 0000-0800 MD MD MD MD MD MD MD MD MD 0800-1600 MD ROD AMO MD ROD AMO MD ROD AMO MD ROD AMO ROD 1600-2400 MD MD Commissioning MD MD Commissioning MD MD Commissioning MD MD Commissioning MD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S 0000-0800 MD MD MD MD MD MD MD MD MD 0800-1600 Young MD ROD DiMauro MD ROD Berrah MD ROD Coffee MD ROD Young-II 1600-2400 L018 MD MD L026 MD MD L015 MD MD L027 MD MD L017 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Su

119

Technological cost-reduction pathways for attenuator wave energy converters in the marine hydrokinetic environment.  

SciTech Connect

This report considers and prioritizes the primary potential technical costreduction pathways for offshore wave activated body attenuators designed for ocean resources. This report focuses on technical research and development costreduction pathways related to the device technology rather than environmental monitoring or permitting opportunities. Three sources of information were used to understand current cost drivers and develop a prioritized list of potential costreduction pathways: a literature review of technical work related to attenuators, a reference device compiled from literature sources, and a webinar with each of three industry device developers. Data from these information sources were aggregated and prioritized with respect to the potential impact on the lifetime levelized cost of energy, the potential for progress, the potential for success, and the confidence in success. Results indicate the five most promising costreduction pathways include advanced controls, an optimized structural design, improved power conversion, planned maintenance scheduling, and an optimized device profile.

Bull, Diana L; Ochs, Margaret Ellen

2013-09-01T23:59:59.000Z

120

DOERS Records Schedule Cross Index to DOE Administrative Records...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules...

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Wholesale Power Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Rate Schedules » Wholesale Power Rate Schedules Services » Rate Schedules » Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina October 1, 2012 Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina October 1, 2012 Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina October 1, 2012 MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association

122

Wholesale Power Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Rate Schedules » Wholesale Power Rate Schedules Services » Rate Schedules » Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina October 1, 2012 Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina October 1, 2012 Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina October 1, 2012 MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association

123

High Performance Adaptive Distributed Scheduling Algorithm  

Science Conference Proceedings (OSTI)

Exascale computing requires complex runtime systems that need to consider affinity, load balancing and low time and message complexity for scheduling massive scale parallel computations. Simultaneous consideration of these objectives makes online distributed ... Keywords: Distributed Scheduling, Adaptive Scheduling, Performance Analysis

Ankur Narang, Abhinav Srivastava, R. K. Shyamasundar

2013-05-01T23:59:59.000Z

124

Online Energy Generation Scheduling for Microgrids with  

E-Print Network (OSTI)

Online Energy Generation Scheduling for Microgrids with Intermittent Energy Sources and Co entitled: Online Energy Generation Scheduling for Microgrids with Intermittent Energy Sources and Co schedul- ing. However, accurate prediction cannot be guaranteed due to the small scale of microgrids

Zhang, Junshan

125

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume II Technical Report, Annual Report to the Texas Commission on Environmental Quality September 2002 August 2003  

E-Print Network (OSTI)

The Energy Systems Laboratory (Laboratory) is pleased to provide our second annual report, Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan to the Texas Council on Environmental Quality (TCEQ) in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003, (e) (a) (b) (Vernon Supp. 2002). This annual report: provides an estimate of the energy savings and NOx reductions from energy code compliance in new residential construction in 38 counties, describes the technology developed to enable the TCEQ to substantiate energy and emissions reduction credits from EE/RE to the Environmental Protection Agency (EPA), and provides valuable insights into the effectiveness of additional energy efficiency and renewable energy measures in existing buildings and industrial facilities.

Haberl, J. S.; Culp, C.; Yazdani, B.; Fitzpatrick, T.; Bryant, J.; Turner, W. D.

2003-01-01T23:59:59.000Z

126

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume I Summary Report, Annual Report to the Texas Commission on Environmental Quality September 2002 August 2003  

E-Print Network (OSTI)

The Energy Systems Laboratory (Laboratory) is pleased to provide our second annual report, Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan to the Texas Council on Environmental Quality (TCEQ) in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003, (e) (a) (b) (Vernon Supp. 2002). This annual report: provides an estimate of the energy savings and NOx reductions from energy code compliance in new residential construction in 38 counties, describes the technology developed to enable the TCEQ to substantiate energy and emissions reduction credits from EE/RE to the Environmental Protection Agency (EPA), and provides valuable insights into the effectiveness of additional energy efficiency and renewable energy measures in existing buildings and industrial facilities.

Haberl, J. S.; Culp, C.; Yazdani, B.; Fitzpatrick, T.; Bryant, J.; Turner, W. D.

2003-01-01T23:59:59.000Z

127

Scheduling and resource binding algorithm considering timing variation  

Science Conference Proceedings (OSTI)

The timing closure problem (e.g., meeting timing/ clock period constraint) is one of the most important problems in the design automation. However, the rapid increase of the impact of the process variation on circuit timing makes the problem much more ... Keywords: binding, high-level synthesis, scheduling, timing analysis, timing variation

Jongyoon Jung; Taewhan Kim

2011-02-01T23:59:59.000Z

128

Max-Weight Scheduling in Queueing Networks with Heavy-Tailed Traffic  

E-Print Network (OSTI)

1 Max-Weight Scheduling in Queueing Networks with Heavy-Tailed Traffic Mihalis G. Markakis, Eytan network with a mix of heavy-tailed and light- tailed traffic, and analyze the impact of heavy unstable otherwise. First, we show that a heavy-tailed traffic flow is delay unstable under any scheduling

Tsitsiklis, John

129

An efficient centralized scheduling algorithm for IEEE 802.16 multi-radio mesh networks  

Science Conference Proceedings (OSTI)

In centralized scheduling for IEEE 802.16 mesh networks, all packets should be transported through the BS (Base Station). The links to or from the BS become the system's bottleneck and the throughput is heavily impacted by the interference. To solve ... Keywords: WiMax, multi-radios, routing, scheduling

Jun Wang; Weijia Jia; Liusheng Huang

2008-01-01T23:59:59.000Z

130

Undergraduate Program Time Limits and Work Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Time Limits and Work Schedules Undergraduate Program Time Limits and Work Schedules Point your career towards LANL: work with the best minds on the planet in an inclusive...

131

Rate Schedule COTP-T3  

NLE Websites -- All DOE Office Websites (Extended Search)

COTP-T3 (Supersedes Schedule COTP-T2) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CALIFORNIA-OREGON TRANSMISSION PROJECT SCHEDULE OF RATE FOR...

132

Alternative Fuels Data Center: Emissions Reduction Requirements  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Emissions Reduction Emissions Reduction Requirements to someone by E-mail Share Alternative Fuels Data Center: Emissions Reduction Requirements on Facebook Tweet about Alternative Fuels Data Center: Emissions Reduction Requirements on Twitter Bookmark Alternative Fuels Data Center: Emissions Reduction Requirements on Google Bookmark Alternative Fuels Data Center: Emissions Reduction Requirements on Delicious Rank Alternative Fuels Data Center: Emissions Reduction Requirements on Digg Find More places to share Alternative Fuels Data Center: Emissions Reduction Requirements on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Emissions Reduction Requirements Recognizing the impact of carbon-emitting fuels on climate change and to

133

PART I - THE SCHEDULE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

J-2 to DE-AM52-09NA28021 J-2 to DE-AM52-09NA28021 STATEMENT OF WORK FOR NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) SUPPORT SERVICES ACQUISITION PREPARATION AND REVIEW OF ENVIRONMENTAL IMPACT STATEMENTS, ENVIRONMENTAL ASSESSMENTS, ENVIRONMENTAL REPORTS, AND OTHER ENVIRONMENTAL DOCUMENTATION dated November 5, 2007 1.0 INTRODUCTION During the next five years, the U.S. Department of Energy's (DOE) Program and Field Offices nationwide, including the National Nuclear Security Agency (NNSA) and the Federal Energy Regulatory Commission (FERC) and their offices, will require Contractor support services for the preparation of environmental impact statements (EISs), environmental assessments (EAs) and related documents under the National Environmental Policy Act (NEPA);

134

EIA Records Schedule 0011.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RECORD SCHEDULE N1-434-94-001 RECORD SCHEDULE N1-434-94-001 EIA Records Schedule N1-434-94-001 Approved by NARA April 3, 1995 (Some surveys are no longer in use. Read notes at bottom of last page) ITEM NO. DESCRIPTION OF RECORDS AUTHORIZED DISPOSITION Item 1) COAL DISTRIBUTION DATA, 1980-1988. This file contains data on the distribution of U.S. coal by coal-producing district of origin, consumer end-use category, state of destination and method of transportation; also included is export shipment information. This is a closed series. Disposition: PERMANENT. Transfer a copy of the data files and documentation to the National Archives upon approval of this schedule by the Archivist of the United States Item 2) HISTORICAL PLANT COST AND ANNUAL PRODUCTION EXPENSE DATA, 1979-1991.

135

Economic Scheduling in Grid Computing  

Science Conference Proceedings (OSTI)

Grid computing is a promising technology for future computing platforms. Here, the task of scheduling computing resources proves difficult as resources are geographically distributed and owned by individuals with different access and cost policies. This ...

Carsten Ernemann; Volker Hamscher; Ramin Yahyapour

2002-07-01T23:59:59.000Z

136

Argonne CNM: Scheduled Maintenance Periods  

NLE Websites -- All DOE Office Websites (Extended Search)

the CNM will not be available for user activities in laboratories or on the High-Performance Computing Cluster. Please plan your work visits and schedules accordingly. To better...

137

A real time priority scheduler  

Science Conference Proceedings (OSTI)

The real time priority scheduler reported herein evolved from a design effort to provide software aids for handling the interrupts that occur in hybrid computation. Since these interrupts are both internal and external (i.e., generated internal and external ...

Karl Ramsay; Jon C. Strauss

1966-01-01T23:59:59.000Z

138

Wholesale Power Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Schedules Schedules Wholesale Power Rate Schedules October 1, 2011 CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU October 1, 2011 CSI-1-H Wholesale Power Rate Schedule Area: Southern Illinois System: CU October 1, 2011 CK-1-H Wholesale Power Rate Schedule Area: KU Area System: CU October 1, 2011 CEK-1-H Wholesale Power Rate Schedule Area: East Kentucky System: CU October 1, 2011 CC-1-I Wholesale Power Rate Schedule Area: CP&L Area, Western Division System: CU September 20, 2011 JW-1-J Wholesale Power Rate Schedule Area: Woodruff Preference Customer System: Jim Woodruff September 20, 2011 JW-2-F Wholesale Power Rate Schedule Area: Florida Power Corporation System: Jim Woodruff November 17, 2010 AP-1-B Wholesale Power Rate Schedule Area: American Electric Power

139

Community-Aware Scheduling Protocol for Grids  

Science Conference Proceedings (OSTI)

Much work has been done to exploit the effectiveness and efficiency of job scheduling upon distributed computationalresources. With regard to existing resource topology and administrative constraints, scheduling approaches are designed ... Keywords: Community-Aware Scheduling Protocol, CASP, Grid, Scheduling, SmartGRID, MaGate

Ye Huang; Amos Brocco; Nik Bessis; Pierre Kuonen; Beat Hirsbrunner

2010-04-01T23:59:59.000Z

140

Green Task Scheduling Algorithms with Speeds Optimization on Heterogeneous Cloud Servers  

Science Conference Proceedings (OSTI)

Currently, a large number of cloud computing servers waste a tremendous amount of energy and emit a considerable amount of carbon dioxide. Thus, it is necessary to significantly reduce pollution and substantially lower energy usage. This paper seeks ... Keywords: Green Computing, Task Scheduling, Energy Reduction, Power-Aware Methods, Pollution Reduction

Luna Mingyi Zhang; Keqin Li; Yan-Qing Zhang

2010-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Exploring decentralized dynamic scheduling for grids and clouds using the community-aware scheduling algorithm  

Science Conference Proceedings (OSTI)

Job scheduling strategies have been studied for decades in a variety of scenarios. Due to the new characteristics of the emerging computational systems, such as the grid and cloud, metascheduling turns out to be an important scheduling pattern because ... Keywords: Cloud, Community-aware scheduling algorithm (CASA), Grid, Meta-scheduling, Scheduling, SmartGRID

Ye Huang; Nik Bessis; Peter Norrington; Pierre Kuonen; Beat Hirsbrunner

2013-01-01T23:59:59.000Z

142

Simultaneous Design, Scheduling and Operation Through Process Integration  

E-Print Network (OSTI)

Processing facilities are normally designed with sufficient flexibility to handle nominal variations. When the process features planned changes in feedstock and products, scheduling is often used to optimize process operation. The objective of this dissertation is to develop a new approach to design and scheduling with economic, environmental, heat integration and inherently safer design objectives. Specifically, this work introduces a systematic framework and the associated mathematical formulation for simultaneous process design and scheduling while simultaneously addressing economic, environmental, heat integration and inherently safer design objectives. Therefore, more than one type of proper tradeoffs are established between these objectives. The environmental issues pertaining to the parameterized process retrofitting, scheduling, and operation strategies are simultaneously considered along with the environmental impact of these changes. Similarly, the design synthesis of heat-exchange networks (HENs) is addressed in the context of optimizing energy consumption under scheduling scenarios. Finally, the goal of inherently safer design is simultaneously considered with the expected schedules of the process. Several optimization formulations are developed for the projected schedules while allowing design modifications and retrofitting changes. The modifications and changes include new environmental management units, synthesis of flexible and optimal HENs, and design of an inherently safer process. Process models with the appropriate level of relevant details are included in the formulations. A discretization approach has been adopted to allow for a multiperiod optimization formulation over a given time horizon. The resulting framework identifies opportunities for synergism between the economic, environmental, heat integration and inherently safer design objectives. It also determines points of diminishing return beyond which tradeoffs between the above mentioned objectives are established. The devised procedure is illustrated with case studies.

Al-Mutairi, Eid M.

2008-08-01T23:59:59.000Z

143

Argonne National Lab Cleanup schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Takes Steps to Complete Clean-Up of Argonne by 2003; Takes Steps to Complete Clean-Up of Argonne by 2003; Schedule for Shipping Waste to WIPP is 'Good News' for Illinois CARLSBAD, N.M., May 15, 2000 - The U.S. Department of Energy (DOE) reinforced plans to complete the clean-up of its Argonne National Laboratory-East site in Illinois by 2003 by accelerating its schedule for shipping transuranic waste to DOE's permanent disposal site in New Mexico. Previously, the shipments were not expected to begin before 2003. Under the accelerated schedule, shipments to DOE's Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, are expected to begin in Spring 2001 and be completed by the end of the calendar year. Characterization of the waste currently stored at Argonne will begin this October. This agreement is a major step in honoring Argonne and DOE's commitment to the community to

144

NSLS-II Project Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

NSLS-II Project Schedule NSLS-II Project Schedule Major Milestone Event Major Milestone Event Preliminary Schedule CD-0 (approve Mission Need) 4th quarter, FY2005 CD-1 (approve Alternative Selection and Cost Range) 4th quarter, FY2007 CD-2 (approve Performance Baseline) 1st quarter, FY2008 CD-3 (approve Start of Construction) 2nd quarter, FY2009 CD-4 (approve Start of Operations) FY2015 Critical Decisions The five Critical Decisions are major milestones approved by the Secretarial Acquisition Executive or Acquisition Executive that establish the mission need, recommended alternative, Acquisition Strategy, the Performance Baseline, and other essential elements required to ensure that the project meets applicable mission, design, security, and safety requirements. Each Critical Decision marks an increase in commitment of

145

Load Scheduling with Profile Information  

E-Print Network (OSTI)

. Within the past five years, many manufactures have added hardware performance counters to their microprocessors to generate profile data cheaply. We show how to use Compaq's DCPI tool to determine load latencies which are at a fine, instruction granularity and use them as fodder for improving instruction scheduling. We validate our heuristic for using DCPI latency data to classify loads as hits and misses against simulation numbers. We map our classification into the Multiflow compiler's intermediate representation, and use a locality sensitive Balanced scheduling algorithm. Our experiments illustrate that our algorithm improves run times by 1% on average, but up to 10% on a Compaq Alpha. 1 Introduction This paper explores how to use hardware performance counters to produce fine grain latency information to improve compiler scheduling. We use this information to hide latencies with any available instruction level parallelism (ILP). (ILP for an instruction is the number of o...

Gtz Lindenmaier; Kathryn S. McKinley; Olivier Temam

2000-01-01T23:59:59.000Z

146

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume III - Appendix, Annual Report to the Texas Commission on Environmental Quality, January 2006 - June 2007  

E-Print Network (OSTI)

The Energy Systems Laboratory, at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its fifth annual report, Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan to the Texas Commission on Environmental Quality. The report is organized in three volumes. Volume I Summary Report provides an executive summary and overview; Volume II Technical Report provides a detailed report of activities, methodologies and findings; Volume III Technical Appendix contains detailed data from simulations for each of the counties included in the analysis.

Degelman, L.; Mukhopadhyay, J.; McKelvey, K.; Montgomery, C.; Baltazar-Cervantes, J. C.; Liu, Z.; Ahmed, M.; Verdict, M.; Muns, S.; Fitzpatrick, T.; Gilman, D.; Yazdani, B.; Culp, C.; Haberl, J. S.

2009-02-20T23:59:59.000Z

147

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume I - Summary Report, Annual Report to the Texas Commission on Environmental Quality, January 2006 - June 2007  

E-Print Network (OSTI)

The Energy Systems Laboratory, at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its fifth annual report, 'Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan' to the Texas Commission on Environmental Quality. This report is organized in three volumes: Volume I - Summary Report - provides an executive summary and overview; Volume II - Technical Report - provides a detailed report of activities, methodologies and findings; Volume III - Technical Appendix - contains detailed data from simulations for each of the counties included in the analysis.

Verdict, M.; Baltazar-Cervantes, J. C.; Yazdani, B.; Ahmed, M.; Degelman, L.; Muns, S.; Fitzpatrick, T.; Gilman, D.; Liu, Z.; Mukhopadhyay, J.; McKelvey, K.; Montgomery, C.; Haberl, J. S.; Culp, C.

2008-01-23T23:59:59.000Z

148

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP) Volume I-Summary Report, Annual Report to the Texas Commission on Environmental Quality, January 2009-December 2009  

E-Print Network (OSTI)

The Energy Systems Laboratory, at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its eighth annual report, 'Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan' to the Texas Commission on Environmental Quality. This report is organized in three volumes: Volume I - Summary Report - provides an executive summary and overview; Volume II - Technical Report - provides a detailed report of activities, methodologies and findings; Volume III - Technical Appendix - contains detailed data from simulations for each of the counties included in the analysis.

Haberl, J.; Culp, C.; Yazdani, B.; Lewis, C.; Liu, Z.; Baltazar-Cervantes, J. C.; Mukhopadhyay, J.; Gilman, D.; Degelman, L.; McKelvey, K.; Claridge, D.

2010-12-01T23:59:59.000Z

149

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume I--Summary Report, Annual Report to the Texas Commission on Environmental Quality, January 2008-December 2008  

E-Print Network (OSTI)

The Energy Systems Laboratory, at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its seventh annual report, 'Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan' to the Texas Commission on Environmental Quality. This report is organized in three volumes: Volume I - Summary Report - provides an executive summary and overview; Volume II - Technical Report - provides a detailed report of activities, methodologies and findings; Volume III - Technical Appendix - contains detailed data from simulations for each of the counties included in the analysis.

Baltazar, Juan-Carlos; Claridge, David; Yazdani, Bahman; Mukhopadhyay, Jaya; Liu, Zi; Muns, Shirley; Gilman, Don; Degelman, Larry; Haberl, Jeff; Culp, Charles

2009-12-01T23:59:59.000Z

150

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP) Volume III- Technical Appendix, Annual Report to the Texas Commission on Environmental Quality, January 2009 December 2009  

E-Print Network (OSTI)

The Energy Systems Laboratory, at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its eighth annual report, 'Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan' to the Texas Commission on Environmental Quality. This report is organized in three volumes: Volume I - Summary Report - provides an executive summary and overview; Volume II - Technical Report - provides a detailed report of activities, methodologies and findings; Volume III - Technical Appendix - contains detailed data from simulations for each of the counties included in the analysis.

Haberl, J.; Culp, C.; Yazdani, B.; Liu, Z.; Baltazar-Cervantes, J. C.; Gilman, D.; Lewis, C.; McKelvey, K.; Mukhopadhyay, J.; Degelman, L.

2010-12-01T23:59:59.000Z

151

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume II - Technical Report, Annual Report to the Texas Commission on Environmental Quality, January 2006 - June 2007  

E-Print Network (OSTI)

The Energy Systems Laboratory, at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its fifth annual report, 'Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan' to the Texas Commission on Environmental Quality. This report is organized in three volumes: Volume I - Summary Report - provides an executive summary and overview; Volume II - Technical Report - provides a detailed report of activities, methodologies and findings; Volume III - Technical Appendix - contains detailed data from simulations for each of the counties included in the analysis.

Degelman, L.; Mukhopadhyay, J.; McKelvey, K.; Montgomery, C.; Baltazar-Cervantes, J. C.; Liu, Z.; Ahmed, M.; Verdict, M.; Muns, S.; Fitzpatrick, T.; Gilman, D.; Yazdani, B.; Culp, C.; Haberl, J. S.

2007-08-01T23:59:59.000Z

152

Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume II--Technical Report, Annual Report to the Texas Commission on Environmental Quality January 2008-December 2008  

E-Print Network (OSTI)

The Energy Systems Laboratory, at the Texas Engineering Experiment Station of the Texas A&M University System, in fulfillment of its responsibilities under Texas Health and Safety Code Ann. 388.003 (e), Vernon Supp. 2002, submits its seventh annual report, 'Energy Efficiency/Renewable Energy (EE/RE) Impact in the Texas Emissions Reduction Plan' to the Texas Commission on Environmental Quality. This report is organized in three volumes: Volume I - Summary Report - provides an executive summary and overview; Volume II - Technical Report - provides a detailed report of activities, methodologies and findings; Volume III - Technical Appendix - contains detailed data from simulations for each of the counties included in the analysis.

Haberl, Jeff; Culp, Charles; Yazdani, Bahman; Gilman, Don; Muns, Shirley; Liu, Zi; Baltazar, Juan-Carlos; Mukhopadhyay, Jaya; Degelman, Larry; Claridge, David

2009-12-01T23:59:59.000Z

153

Technical Qualification Program Accreditation Schedule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Qualification Program (TQP) Accreditation Schedule Qualification Program (TQP) Accreditation Schedule (Note 1) Year 2013 2014 Month Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec P Site/Office EM Sites/Offices Y Carlsbad Field Office ? Consolidated Business Center Y Office of River Protection (Note 3) ? Office of Site Support and Small Projects N Portsmouth/Paducah Project Office Y Richland Operations Office (Note 3) Y Savannah River Operations Office N Office of Environmental Management SC Sites/Offices

154

Conceptual scheduling model and optimized release scheduling for agile environments  

Science Conference Proceedings (OSTI)

Context: Release scheduling deals with the selection and assignment of deliverable features to a sequence of consecutive product deliveries while several constraints are fulfilled. Although agile software development represents a major approach to software ... Keywords: Agile software development, Planning metamodel, Release planning

kos Szke

2011-06-01T23:59:59.000Z

155

Occupancy Simulation Schedule Appendix C -Occupancy Simulation Schedule  

E-Print Network (OSTI)

into the electrical panel for run times commensurate with identified use profiles. The profiles enabled sought Figure C.1 and Figure C.2 present the load simulation and occupancy schedules for the lab homes highly insulating windows demonstration. The bases for occupancy simulation were data and analysis developed

156

Notice of Cancellation of the Environmental Impact Statement for the Clean Power From Integrated Coal/Ore Reduction (CPICOR) Project (DOE/EIS-0280) (10/26/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Federal Register / Vol. 69, No. 206 / Tuesday, October 26, 2004 / Notices DEPARTMENT OF ENERGY Notice of Cancellation of Environmental Impact Statement for the McIntosh Unit 4 Pressurized Circulating Fluidized Bed Demonstration Project AGENCY: Department of Energy. ACTION: Notice of cancellation of Environmental Impact Statement Process. SUMMARY: The Department of Energy (DOE) is canceling the preparation of an Environmental Impact Statement (EIS) for a proposal by the City of Lakeland to design, construct, and operate a project known as the McIntosh Unit 4 Pressurized Circulating Fluidized Bed Demonstration Project in Lakeland, Florida. DOE selected the City of Lakeland's proposal for further consideration under DOE's Clean Coal Technology Demonstration Program

157

1996 Wholesale Power and Transmission Rate Schedules.  

Science Conference Proceedings (OSTI)

Bonneville Power Administration`s (BPA) 1996 Wholesale Power Rate Schedules, 1996 Ancillary Products and Services Rate Schedule, 1996 Transmission Rate Schedules, and General Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1996. These rate schedules and provisions were approved by the Federal Energy Regulatory Commission (FERC), United States Department of Energy, in September 1996 (Docket Nos EF96-2011-000 and EF96f-2021-000). These rate schedules and General Rate Schedule Provisions were approved on a final basis by the FERC July 30, 1997, in Dept. of Energy--Bonneville Power Administration, Docket Nos. EF96-2011-000 and EF96-2021-000. Except as noted elsewhere, these 1996 rate schedules and provisions supersede BPA`s Wholesale Power Rate Schedules and General Rate Schedule Provisions, and Transmission Rate Schedules and General Transmission Rate Schedule Provisions, effective October 1, 1995. These rate schedules and general rate schedule provisions include all errata.

United States. Bonneville Power Administration.

1996-10-01T23:59:59.000Z

158

Ngfast : a simulation model for rapid assessment of impacts of natural gas pipeline breaks and flow reductions at U. S. state borders and import points.  

Science Conference Proceedings (OSTI)

This paper describes NGfast, the new simulation and impact-analysis tool developed by Argonne National Laboratory for rapid, first-stage assessments of impacts of major pipeline breaks. The methodology, calculation logic, and main assumptions are discussed. The concepts presented are most useful to state and national energy agencies tasked as first responders to such emergencies. Within minutes of the occurrence of a break, NGfast can generate an HTML-formatted report to support briefing materials for state and federal emergency responders. Sample partial results of a simulation of a real system in the United States are presented.

Portante, E. C.; Craig, B. A.; Folga, S.M.

2007-01-01T23:59:59.000Z

159

Dynamic Scheduling via Polymatroid Optimization  

Science Conference Proceedings (OSTI)

Dynamic scheduling of multi-class jobs in queueing systems has wide ranging applications, but in general is a very difficult control problem. Here we focus on a class of systems for which conservation laws hold. Consequently, the performance space becomes ...

David D. Yao

2002-01-01T23:59:59.000Z

160

ORIENTATION SCHEDULE POSTGRADAUTE TAUGHT PROGRAMMES  

E-Print Network (OSTI)

ORIENTATION SCHEDULE POSTGRADAUTE TAUGHT PROGRAMMES FRIDAY, 25TH SEPTEMBER 2009 TIME: 2.00PM - 5 Opportunities· Refreshments· To register for the Orientation Programme and a Campus Tour kindly log on to: www.dcu.ie/postgraduate_orientationDCUcommunityforthefirsttime,youshallbeprovidedwithinformation about your programme and other School-related aspects of your programme. The Orientation Programme

Blott, Stephen

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Schedule of Classes Spring 2006  

E-Print Network (OSTI)

. In addition, a new Dance subject area was established. This makes dance classes easier to find in the Schedule student), not on the number of enrolled units. They do not include additional course or unit-based fees. For additional deadline informa- tion, see the Ashe Center website at http://www.studenthealth.ucla .edu

Grether, Gregory

162

Load Scheduling with Profile Information  

E-Print Network (OSTI)

Abstract Within the past five years, many manufactureshave added hardware performance counters to their microprocessors to generate profile data cheaply.Translating aggregate data such as basic block execution frequencies from the executable to the com-piler intermediate representation is fairly straightforward. In this paper, we show how to use Com-paq's DCPI tool to determine load latencies which are at a fine, instruction granularity and then usethem to provide fodder for improving instruction scheduling. We validate our heuristic for usingDCPI latency data to classify loads as hits and misses against simulation numbers, demonstratingthat we can gather correct latencies cheaply at runtime. We map our classification into the Multiflowcompiler's intermediate representation, and use a locality sensitive Balanced scheduling algorithm. Ourexperiments illustrate that our algorithm has the potential to improve run times by up to 10 % on a Com-paq Alpha when compared to Balanced scheduling, but that a variety of pitfalls make consistent im-provements difficult to attain. 1 Introduction In this paper, we explore how to use hardware per-formance counters to produce fine grain latency information to improve compiler scheduling. We usethis information to hide latencies with any avail\\Lambda The authors

unknown authors

1999-01-01T23:59:59.000Z

163

FIMS Data Validation Schedule FY 2010_090729.xls | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FIMS Data Validation Schedule FY 2010090729.xls FIMS Data Validation Schedule FY 2010090729.xls FIMS Data Validation Schedule FY 2010090729.xls More Documents & Publications...

164

SNS Run Schedule for FY 2012 | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Home Facilities SNS SNS Operating Status FY 2012 Run Schedule SNS Run Schedule for FY 2012 (Oct. 2011-Sep. 2012) Printable version Excel version SNS Run Schedule...

165

Optimal scheduling of fighter aircraft maintenance  

E-Print Network (OSTI)

The effective scheduling of fighter aircraft maintenance in the Air Force is crucial to overall mission accomplishment. An effective maintenance scheduling policy maximizes the use of maintenance resources and aircraft ...

Cho, Philip Y

2011-01-01T23:59:59.000Z

166

Co-scheduling hardware and software pipelines  

E-Print Network (OSTI)

In this paper we propose CO-Scheduling, a framework for simultaneous design of hardware pipelines struc-tures and software-pipelined schedules. Two important components of the Co-Scheduling framework are: (1) An extension to the analysis of hardware pipeline design that meets the needs of periodic (or software pipelined) schedules. Reservation tables, forbidden la-tencies, collision vectors, and state diagrams from classical pipeline theory are revisited and extended to solve the new problems. (2) An efficient method, based on the above extension of pipeline analysis, to perform (a) software pipeline scheduling and (b) hardware pipeline reconfiguration which are mutually compatible . The proposed method has been implemented and pre-liminary experimental results for 1008 kernel loops are reported. Co-scheduling successfully obtains a sched-ule for 95 % of these loops. The median time to obtain these schedules is 0.25 seconds on a Sparc-20. Keywords:

R. Govindarajan; Erik R. Altman; Guang R. Gao

1996-01-01T23:59:59.000Z

167

Graduate Program Time Limits and Work Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Time Limits and Work Schedules Graduate Program Time Limits and Work Schedules Point your career towards LANL: work with the best minds on the planet in an inclusive environment...

168

ALS Operating Schedule on Google Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

ALS Operating Schedule on Google Calendar Print ALS Operating Schedule Your browser does not appear to support JavaScript, but this page needs to use JavaScript to display...

169

ALS Operating Schedule on Google Calendar  

NLE Websites -- All DOE Office Websites (Extended Search)

Operating Schedule on Google Calendar Print ALS Operating Schedule Your browser does not appear to support JavaScript, but this page needs to use JavaScript to display correctly....

170

ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS...  

NLE Websites -- All DOE Office Websites (Extended Search)

DISPOSAL RECORDS (Revision 2) More Documents & Publications Records Management Handbook PROPERTY DISPOSAL RECORDS ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND...

171

A novel algorithm for dynamic task scheduling  

Science Conference Proceedings (OSTI)

This paper deals with the problem of dynamic task scheduling in grid environment of multi-processors. First, this paper formulates task scheduling as an optimization problem and then optimizes with a novel hybrid optimization algorithm. The proposed ... Keywords: Bacteria foraging optimization, Genetic algorithms, Grid computing, Task scheduling

Sasmita Kumari Nayak; Sasmita Kumari Padhy; Siba Prasada Panigrahi

2012-05-01T23:59:59.000Z

172

QUICK scheduler a time-saving tool for scheduling class sections  

Science Conference Proceedings (OSTI)

QUICK Scheduler is a web-based application to help students and academic advisors with the scheduling process. At the point where a student knows what courses he or she will take in a given semester, the courses can be put into the scheduler and the ... Keywords: class scheduling, registration tool, software maintenance, student software development

Cherry Keahey Owen

2005-11-01T23:59:59.000Z

173

Scheduling trains as a blocking parallel-machine job shop scheduling problem  

Science Conference Proceedings (OSTI)

In this paper, the train scheduling problem is modelled as a blocking parallel-machine job shop scheduling (BPMJSS) problem. In the model, trains, single-track sections and multiple-track sections, respectively, are synonymous with jobs, single machines ... Keywords: Blocking, Job shop scheduling, Parallel machine, Train scheduling

Shi Qiang Liu; Erhan Kozan

2009-10-01T23:59:59.000Z

174

Weekly Petroleum Status Report Schedule  

Gasoline and Diesel Fuel Update (EIA)

Weekly Petroleum Status Report Weekly Petroleum Status Report Release Schedule The wpsrsummary.pdf, overview.pdf, and Tables 1-14 in CSV and XLS formats, are released to the Web site after 10:30 a.m. (Eastern Time) on Wednesday. All other PDF and HTML files are released to the Web site after 1:00 p.m. (Eastern Time) on Wednesday. Appendix D is produced during the winter heating season, which extends from October through March of each year. For some weeks which include holidays, releases are delayed by one day. Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Wednesdays with the following exceptions. All times are Eastern. Data for the week ending Alternate Release Date Release Day Release Time Holiday October 11, 2013 October 21, 2013 Monday 10:30 a.m. Columbus/EIA Closed

175

The NCRC Grid Scheduling Environment  

Science Conference Proceedings (OSTI)

In support of the NCRC, a joint computing center between NOAA and ORNL, a grid-based scheduling infrastructure was designed to allow geographically separate computing resources to be used as production resources in climate and weather research workflows. These workflows require job coordination between the two centers in order to provide a complete workflow of data staging, computation, post-analysis and archival. This paper details the design, implementation and initial production phase of the infrastructure and lessons learned from the process.

Indiviglio, Frank M [ORNL; Maxwell, Don E [ORNL

2011-01-01T23:59:59.000Z

176

This Week In Petroleum Schedule  

U.S. Energy Information Administration (EIA) Indexed Site

This Week In Petroleum Schedule This Week In Petroleum Schedule Holiday Release Schedule for the This Week In Petroleum The standard release time and day of the week will be after 1:00 p. m. (Eastern time) on Wednesdays with the following exceptions. Data for the week ending Alternate Release Date Release Day Release Time Holiday November 8, 2013 November 14, 2013 Thursday after 1:00 p.m. Veterans December 20, 2013 December 27, 2013 Friday after 1:00 p.m. Christmas December 27, 2013 January 3, 2014 Friday after 1:00 p.m. New Year's January 17, 2014 January 23, 2014 Thursday after 1:00 p.m. Martin Luther King Jr. February 14, 2014 February 20, 2014 Thursday after 1:00 p.m. President's May 23, 2014 May 29, 2014 Thursday after 1:00 p.m. Memorial August 29, 2014 September 4, 2014 Thursday after 1:00 p.m. Labor

177

1998 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Tue, Nov 11, 17:00 Wed, Nov 12, '97 17:00 Mon, Nov 17, '97 18:00-Wed, Nov 19, '97 02:00 32 hrs Mon, Dec 01, '97 17:00 Tue, Dec 02, '97 13:00 Mon, Dec 08, '97 06:00-Wed, Dec 10, '97 02:00 44 hrs Mon, Jan 05, 17:00 Tue, Jan 06, 13:00 Mon, Jan 12, 18:00-Wed, Jan 14, 02:00 32 hrs Fri, Jan 16, 17:00 Tue, Jan 20, 13:00 Mon, Jan 26, 06:00-Wed, Jan 28, 02:00 44 hrs Mon, Feb 02, 17:00 Tue, Feb 03, 13:00 Tue, Feb 10, 18:00-Thu, Feb 12, 02:00 32 hrs Tue, Feb 17, 17:00 Wed, Feb 18, 17:00 Mon, Feb 23, 06:00-Wed, Feb 25, 02:00 44 hrs Mon, Mar 02, 17:00 Tue, Mar 03, 13:00 Mon, Mar 09, 18:00-Wed, Mar 11, 02:00 32 hrs Mon, Mar 16, 17:00 Tue, Mar 17, 13:00 Mon, Mar 23, 06:00-Wed, Mar 25, 02:00 44 hrs

178

1997 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 11, '96 17:00 Tue, Nov 12, '96 13:00 Tue, Nov 19, '96 15:00-Wed, Nov 20, '96 02:00 11 hrs Mon, Dec 02, '96 17:00 Tue, Dec 03, '96 13:00 Mon, Dec 09, '96 06:00-Wed, Dec 11, '96 02:00 44 hrs Mon, Jan 06, 17:00 Tue, Jan 07, 13:00 Mon, Jan 13, 18:00-Wed, Jan 15, 02:00 32 hrs Mon, Jan 20, 17:00 Tue, Jan 21, 13:00 Mon, Jan 27, 06:00-Wed, Jan 29, 02:00 44 hrs Mon, Feb 03, 17:00 Tue, Feb 04, 13:00 Tue, Feb 11, 18:00-Thu, Feb 13, 02:00 32 hrs Mon, Feb 18, 09:30 Tue, Feb 18, 13:00 Mon, Feb 24, 06:00-Wed, Feb 26, 02:00 44 hrs Mon, Mar 03, 17:00 Tue, Mar 04, 13:00 Mon, Mar 10, 18:00-Wed, Mar 12, 02:00 32 hrs Mon, Mar 17, 17:00 Tue, Mar 18, 13:00 Mon, Mar 24, 06:00-Wed, Mar 26, 02:00 44 hrs

179

2000 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 08, '99 17:00 Tue, Nov 09, '99 13:00 Mon, Nov 15, '99 18:00-Wed, Nov 17, '99 02:00 32 hrs Mon, Nov 29, '99 17:00 Tue, Nov 30, '99 13:00 Mon, Dec 06, '99 06:00-Wed, Dec 08, '99 02:00 44 hrs Mon, Jan 03, 17:00 Tue, Jan 04, 13:00 Mon, Jan 10, 18:00-Wed, Jan 12, 02:00 32 hrs Fri, Jan 14, 17:00 Tue, Jan 18, 13:00 Mon, Jan 24, 06:00-Wed, Jan 26, 02:00 44 hrs Mon, Feb 14, 17:00 Tue, Feb 15, 17:00 Tue, Feb 22, 06:00-Thu, Feb 24, 02:00 44 hrs Mon, Feb 28, 17:00 Tue, Feb 29, 13:00 Mon, Mar 06, 18:00-Wed, Mar 08, 02:00 32 hrs Mon, Mar 13, 17:00 Tue, Mar 14, 13:00 Mon, Mar 20, 06:00-Wed, Mar 22, 02:00 44 hrs Mon, Apr 10, 17:00 Tue, Apr 11, 13:00 Mon, Apr 17, 06:00-Wed, Apr 19, 02:00 44 hrs

180

2002 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 05, '01 17:00 Tue, Nov 06, '01 13:00 Mon, Nov 12, '01 18:00-Wed, Nov 14, '01 02:00 32 hrs Mon, Dec 03, '01 17:00 Tue, Dec 04, '01 13:00 Mon, Dec 10, '01 06:00-Wed, Dec 12, '01 02:00 44 hrs Mon, Dec 17, '01 09:00 Tue, Dec 18, '01 13:00 Mon, Jan 07, 18:00-Wed, Jan 9, 02:00 32 hrs Mon, Jan 14, 12:00 Tue, Jan 15, 13:00 Tue, Jan 22, 06:00-Thu, Jan 24, 02:00 44 hrs Mon, Jan 28, 17:00 Tue, Jan 29, 17:00 Tue, Feb 05, 18:00-Thu, Feb 07, 02:00 32 hrs Mon, Feb 11, 17:00 Tue, Feb 12, 17:00 Tue, Feb 19, 06:00-Wed, Feb 20, 02:00 20 hrs Mon, Feb 25, 17:00 Tue, Feb 26, 13:00 Mon, Mar 04, 18:00-Wed, Mar 06, 02:00 32 hrs Mon, Mar 11, 17:00 Tue, Mar 12, 13:00 Mon, Mar 18, 06:00-Wed, Mar 20, 02:00 44 hrs

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

1999 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

9 SSRL Accelerator Physics Schedule 9 SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 30, '98 17:00 Tue, Dec 01, '98 13:00 Mon, Dec 07, '98 06:00-Wed, Dec 09, '98 02:00 44 hrs Mon, Jan 04, 17:00 Tue, Jan 05, 13:00 Mon, Jan 11, 18:00-Wed, Jan 13, 02:00 32 hrs Fri, Jan 15, 17:00 Tue, Jan 19, 13:00 Mon, Jan 25, 06:00-Wed, Jan 27, 02:00 44 hrs Mon, Feb 01, 17:00 Tue, Feb 02, 13:00 Tue, Feb 09, 18:00-Thu, Feb 11, 02:00 32 hrs Tue, Feb 16, 17:00 Wed, Feb 17, 17:00 Mon, Feb 22, 06:00-Wed, Feb 24, 02:00 44 hrs Mon, Mar 01, 17:00 Tue, Mar 02, 13:00 Mon, Mar 08, 18:00-Wed, Mar 10, 02:00 32 hrs Mon, Mar 15, 17:00 Tue, Mar 16, 13:00 Mon, Mar 22, 06:00-Wed, Mar 24, 02:00 44 hrs Mon, Apr 12, 17:00 Tue, Apr 13, 13:00 Mon, Apr 19, 06:00-Wed, Apr 21, 02:00 44 hrs

182

Enhanced Energy-Aware Feedback Scheduling of Embedded Control Systems  

E-Print Network (OSTI)

Dynamic voltage scaling (DVS) is one of the most effective techniques for reducing energy consumption in embedded and real-time systems. However, traditional DVS algorithms have inherent limitations on their capability in energy saving since they rarely take into account the actual application requirements and often exploit fixed timing constraints of real-time tasks. Taking advantage of application adaptation, an enhanced energy-aware feedback scheduling (EEAFS) scheme is proposed, which integrates feedback scheduling with DVS. To achieve further reduction in energy consumption over pure DVS while not jeopardizing the quality of control, the sampling period of each control loop is adapted to its actual control performance, thus exploring flexible timing constraints on control tasks. Extensive simulation results are given to demonstrate the effectiveness of EEAFS under different scenarios. Compared with the optimal pure DVS scheme, EEAFS saves much more energy while yielding comparable control performance.

Xia, Feng; Zhao, Wenhong; Sun, Youxian; Dong, Jinxiang

2008-01-01T23:59:59.000Z

183

Microsoft Word - Changes-to-Schedules _Recovered_  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Changes-to-Schedules Changes-to-Schedules REV 5 DOE Administrative Records Schedules Changes Last revised: 12/10/2010 Date DOE Admin Schedule Item(s) Change Authorizing Document 9/15/10 - 12/10/2010 1-6, 9, 11-12, 14, 16-18, 22- 23 Various Removal of items at the end of each schedule for e-mail and word processing copies, which were added to the GRS in Transmittal Number 8. For schedules in which this item is located elsewhere and removal would cause changes in the sequence of item numbers, the item was changed to "Reserved" (Schedules ,4,5, and 14.) GRS Transmittal Number 22 9/15/2010 1 23.b.(3) Deleted citation, 5 CFR 214. GRS Transmittal Number 22 1 25.a. Text deleted "and as described in 29 CFR 1614." GRS Transmittal Number 22

184

Scheduling to Be Competitive in Supply Chains  

E-Print Network (OSTI)

We assume an open supply chain environment where organizations in a globalized trading scenario can sub-contract out sub-tasks to other organizations through a contracting process. Manufacturers are assumed to award sub-contracts to bidding suppliers using an auction scheme. Of particular interest in this environment is the task scheduling strategies used by suppliers in response to manufacturer-announced task contracts. Tasks can be characterized by their constraints including their length and scheduling window. Task scheduling decisions for a supplier should be targeted towards creating a schedule that is flexible in accommodating short-notice tasks or schedule adjustments due to unforeseen events. We experimentally evaluate the effects of different scheduling heuristics in accommodating different task mixes. We also investigate the effects of a price adjustment scheme to adjust bids when an agent perceives reduced competition from other suppliers. Our simulation results identify the environmental niches for different scheduling heuristics. 1

Partha Sarathi Dutta; Sandip Sen; Ip Sen; Rajatish Mukherjee

2001-01-01T23:59:59.000Z

185

Realizing load reduction functions by aperiodic switching of load groups  

SciTech Connect

This paper investigates the problem of scheduling ON/OFF switching of residential appliances under the control of a Load Management System (LMS). The scheduling process is intended to reduce the controlled appliances` power demand in accordance with a predefined load reduction profile. To solve this problem, a solution approach, based on the methodology of Pulse Width Modulation (PWM), is introduced. This approach provides a flexible mathematical basis for studying different aspects of the scheduling problem. The conventional practices in this area are shown to be special cases of the PWM technique. By applying the PWM-based technique to the scheduling problem, important classes of scheduling errors are identified and analytical expressions describing them are derived. These expressions are shown to provide sufficient information to compensate for the errors. Detailed simulations of load groups` response to switching actions are use to support conclusions of this study.

Navid-Azarbaijani, N. [McGill Univ., Montreal, Quebec (Canada). Dept. of Electrical Engineering; Banakar, M.H. [CAE Electronics Ltd., St. Laurent, Quebec (Canada)

1996-05-01T23:59:59.000Z

186

Next Generation CANDU: Conceptual Design for a Short Construction Schedule  

SciTech Connect

Atomic Energy of Canada Ltd. (AECL) has very successful experience in implementing new construction methods at the Qinshan (Phase III) twin unit CANDU 6 plant in China. This paper examines the construction method that must be implemented during the conceptual design phase of a project if short construction schedules are to be met. A project schedule of 48 months has been developed for the nth unit of NG (Next Generation) CANDU with a 42 month construction period from 1. Concrete to In-Service. An overall construction strategy has been developed involving paralleling project activities that are normally conducted in series. Many parts of the plant will be fabricated as modules and be installed using heavy lift cranes. The Reactor Building (RB), being on the critical path, has been the focus of considerable assessment, looking at alternative ways of applying the construction strategy to this building. A construction method has been chosen which will result in excess of 80% of internal work being completed as modules or as very streamlined traditional construction. This method is being further evaluated as the detailed layout proceeds. Other areas of the plant have been integrated into the schedule and new construction methods are being applied to these so that further modularization and even greater paralleling of activities will be achieved. It is concluded that the optimized construction method is a requirement, which must be implemented through all phases of design to make a 42 month construction schedule a reality. If the construction methods are appropriately chosen, the schedule reductions achieved will make nuclear more competitive. (authors)

Hopwood, Jerry M.; Love, Ian J.W.; Elgohary, Medhat; Fairclough, Neville [Atomic Energy of Canada Ltd., Ontario (Canada)

2002-07-01T23:59:59.000Z

187

A survey of dynamic scheduling in manufacturing systems  

Science Conference Proceedings (OSTI)

In most real-world environments, scheduling is an ongoing reactive process where the presence of a variety of unexpected disruptions is usually inevitable, and continually forces reconsideration and revision of pre-established schedules. Many of the ... Keywords: Agent-based scheduling, Dynamic scheduling, Predictive---reactive scheduling, Robust scheduling

Djamila Ouelhadj; Sanja Petrovic

2009-08-01T23:59:59.000Z

188

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

2) 2) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2011-3 2012-1 2012-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

189

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

1) 1) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2010-3 2011-1 2011-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

190

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

3) 3) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2012-3 2013-1 2013-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

191

APS Long Range Schedule 2000  

NLE Websites -- All DOE Office Websites (Extended Search)

APS FY2000 Beamline Operations Schedule APS FY2000 Beamline Operations Schedule JAN Monday Tuesday Wednesday Thursday Friday Saturday Sunday Week 1 10 11 12 13 14 15 16 0000-0800 SM SM SM SM SM MS MS 0800 - 1600 SM SM SM SM MS MS MS 1600 - 2400 SM SM SM SM MS MS MS Week 2 17 18 19 20 21 22 23 0000 - 0800 MS MS MS UO UO UO UO 0800 - 1600 MS MS UO UO UO UO UO 1600 - 2400 MS MS UO UO UO UO UO Week 3 24 25 26 27 28 29 30 0000 - 0800 UO UO UO UO UO UO UO 0800 - 1600 UO MS UO UO UO UO UO 1600 - 2400 UO UO UO UO UO UO UO JAN/FEB 31 1 2 3 4 5 6 0000 - 0800 UO MS MS UO UO UO UO 0800 - 1600 MS MS UO UO UO UO UO 1600 - 2400 MS MS UO UO UO UO UO Week 5 7 8 9 10 11 12 13 0000 - 0800 UO UO UO UO UO UO UO

192

Plans and Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appliance & Equipment Standards » About » Plans and Schedules Appliance & Equipment Standards » About » Plans and Schedules Plans and Schedules The Appliances and Equipment Standards program maintains a multi-year rulemaking schedule. The currently scheduled rulemaking activities are described in the program's semi-annual implementation report to Congress. The program will also issue other plans and schedules when needed. The most recent 5-year plan was released in October 2010 and outlines how the program planned to meet all the statutory requirements established in the Energy Policy and Conservation Act of 1975, as amended. Expedited Rulemakings In November 2010, the Department of Energy (DOE) adopted new procedures that enable certain rulemakings to be expedited or improve the efficiency of the rulemaking process:

193

Definition: Net Interchange Schedule | Open Energy Information  

Open Energy Info (EERE)

Interchange Schedule Interchange Schedule Jump to: navigation, search Dictionary.png Net Interchange Schedule The algebraic sum of all Interchange Schedules with each Adjacent Balancing Authority.[1] Related Terms Balancing Authority, Adjacent Balancing Authority, Interchange, Interchange Schedule, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Net_Interchange_Schedule&oldid=502531" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

194

Spent nuclear fuel project integrated schedule plan  

SciTech Connect

The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

Squires, K.G.

1995-03-06T23:59:59.000Z

195

Renewable Fuel Standard Schedule | Open Energy Information  

Open Energy Info (EERE)

Standard Schedule Standard Schedule Jump to: navigation, search Name Renewable Fuel Standard Schedule Sector Liquid Transportation Fuels Spatial Resolution National Geographic Scope United States Temporal Resolution Annual The United States Environmental Protection Agency, under the National Renewable Fuel Standard program and as required by the Energy Independence and Security Act of 2007 (EISA), periodically revises the volumetric standards for cellulosic biofuel, biomass-based diesel, advanced biofuel, and total renewable fuel that must be used in transportation fuel each year. The table below lists the current RFS2 schedule in billions of gallons: Year Renewable Biofuel Advanced Biofuel Cellulosic Biofuel Biomass-based Diesel Undifferentiated Total 2008 9 9

196

Optimal parallel scheduling of Gaussian elimination DAGs  

SciTech Connect

A parallel algorithm for Gaussian elimination (GE) is described which solves a linear system of size n using m>n parallel processors and a shared random access memory. Converting the serial GE algorithm to parallel form involves scheduling its computation DAG (direct acyclic graphs) on m processors. A lower bound for schedule length is established for dense GE DAGs, and it is proved that the proposed algorithm produces schedules which achieve these bounds. Finally, the construction and execution of the schedule are incorporated into a single concurrent program, which is shown to run in optimal time. 17 references.

Srinivas, M.A.

1983-12-01T23:59:59.000Z

197

Scheduling coal handling processes using metaheuristics.  

E-Print Network (OSTI)

??The operational scheduling at coal handling facilities is of the utmost importance to ensure that the coal consuming processes are supplied with a constant feed (more)

Conradie, David Gideon

2008-01-01T23:59:59.000Z

198

Daily Scheduling of Nurses in Operating Suites  

E-Print Network (OSTI)

This, in turn, leads to reduced patient safety and substandard treatment ... to improve the nurse scheduling process (Ernst et al., 2004). Recent surveys include...

199

Rate Schedule CV-EID4  

NLE Websites -- All DOE Office Websites (Extended Search)

CV-EID3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR ENERGY IMBALANCE SERVICE Effective: October 1, 2011,...

200

Rate Schedule CV-SUR4  

NLE Websites -- All DOE Office Websites (Extended Search)

CV-SUR3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR SUPPLEMENTAL RESERVE SERVICE Effective: October 1, 2011,...

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Rate Schedule CV-SPR4  

NLE Websites -- All DOE Office Websites (Extended Search)

CV-SPR3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR SPINNING RESERVE SERVICE Effective: October 1, 2011,...

202

Rate Schedule CV-SPR4  

NLE Websites -- All DOE Office Websites (Extended Search)

Any charges or credits associated with the creation, termination, or modification to any tariff, contract, or rate schedule accepted or approved by the Federal Energy Regulatory...

203

Rate Schedule CV-SUR4  

NLE Websites -- All DOE Office Websites (Extended Search)

Any charges or credits associated with the creation, termination, or modification to any tariff, contract, or rate schedule accepted or approved by the Federal Energy Regulatory...

204

EM Quality Assurance Assessment Schedule FY 2010  

Energy.gov (U.S. Department of Energy (DOE))

Attached for planning and coordination purposes is the updated Quality Assurance(QA) assessment schedule for the remainder of fiscal year (FY) 2010.

205

Rate Schedule PACI-T3  

NLE Websites -- All DOE Office Websites (Extended Search)

or rate schedule accepted or approved by the Federal Energy Regulatory Commission (FERC) or other regulatory bodies will be passed on to each relevant customer. The FERC's or...

206

NRC comprehensive records disposition schedule. Revision 2  

SciTech Connect

Title 44 United States Code, ``Public Printing and Documents,`` regulations cited in the General Services Administration`s (GSA) ``Federal Information Resources Management Regulations`` (FIRMR), Part 201-9, ``Creation, Maintenance, and Use of Records,`` and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules.

Not Available

1992-03-01T23:59:59.000Z

207

AVLIS production plant project schedule and milestones  

SciTech Connect

An AVLIS Production Plant Deployment Schedule for the engineering, procurement, and construction for both the Initial Increment of Production and the fully Activated Plant, has been developed by the project team consisting of Lawrence Livermore National Laboratory, Martin Marietta Energy Systems, Inc. with architect-engineer support from Bechtel National, Inc., Stone and Webster Engineering Corporation, and Westinghouse Corporation. The initial deployment phase consists of six separators modules and the three laser power amplifier modules consistent with the FY84 reference design with a name plate capacity of 5 million separative work units/yr followed by a full plant activation to approximately 13 million separative work units/yr. The AVLIS Production Plant project team's strategy for deployment schedule analysis focused on three schedule options: engineering limited schedule; authorization limited schedule; and funding limited project schedule. The three deployment schedule options developed by AVLIS project team have been classified in ranges such as an optimistic, rapid/moderate, or moderate/pessimistic based on the probability of meeting the individual schedule option's major milestones or program objectives of enriching uranium by the AVLIS process in an effective cost and schedule manner. 47 figures, 7 tables.

1984-11-15T23:59:59.000Z

208

Instrument Schedule for ng7refl  

Science Conference Proceedings (OSTI)

Instrument Schedule For NG-7 -- Cold neutron reflectometer-horizontal sample. ... 12/12/2012 11:00, 6, 18041, Dependence of the fusion of Dengue E ...

209

Rate Schedule CV-TPT7  

NLE Websites -- All DOE Office Websites (Extended Search)

OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR TRANSMISSION OF WESTERN POWER BY OTHERS Effective: October 1, 2011, through September 30,...

210

400A Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

27-ID and 35-ID 27-ID and 35-ID Past 27-ID and 35-ID Long Range Schedule (pdf) 27-ID and 35-ID Past Construction Past 27-ID and 35-ID Construction Day Activity Impact Week of 06.11.13 35-ID-D panels arrive, 35-ID-C panel installation complete. Start installation of 35-ID-D. -/- Week of 06.13.13 DCS/RIXS Construction Progress Meeting, LOM 438-C010, 9AM -/- Week of 06.18.13 27-ID-A panels arrive -/- Week of 06.25.13 first shipment of 35-ID-E panels arrives -/- Week of 06.03.13 continue installation of 35-ID-C panels, doors, roof and floor trim Low Week of 05.20.13 35-ID-C panels arrive begin installation of 35-ID-C wall and roof panels Low Week of 05.13.13 completion of 35-ID-B roof panels, installation of lead trim, steel capping and door installation. Low Tuesday - 03.05.13

211

Performance evaluation of scheduling in IEEE 802.16 based wireless mesh networks  

E-Print Network (OSTI)

Abstract-We propose an efficient centralized scheduling algorithm in IEEE 802.16 based Wireless Mesh Networks (WMN) to provide high qualified wireless multimedia services. Our algorithm takes special attention on the relay function of the mesh nodes in a transmission tree which is seldom studied in previous research. Some important design metrics, such as fairness, channel utilization and transmission delay are considered in this scheduling algorithm. IEEE 802.16 employs TDMA and the selection policy for scheduled links in a time slot will definitely impact the system performance. We evaluated the proposed algorithm with four selection criteria through extensive simulations and the results are instrumental for improving the performance of IEEE 802.16 based WMNs in terms of link scheduling. I.

Bo Han; Fung Po Tso; Lidong Lin; Weijia Jia

2007-01-01T23:59:59.000Z

212

45329 SCHEDULING POSTER.ai  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

These courses have immediate open registraton These courses have immediate open registraton PLEASE LOOK FOR US AT http://energy.gov/dvu/professional-skills-and-technical-training OFFICE OF LEARNING & WORKFORCE DEVELOPMENT Professional Skills & Technical Training Program FY 2014 Corporate Schedule Points of Contact: If you have any logistical/registration questions please contact: Shira Kimble at 202-586-8449 or 301-903-5116. Course Title: Course Date: Time: CHRIS Code: Session: Location: Trustworthy Customer Services NEW January 15-16, 2014 8:30am-4:00pm 002452 0001 Forrestal RM GH- 043 CSRS Retirement Seminar January 28-30, 2014 8:30am-4:00pm 000033 0091 Forrestal RM GH- 043 Managing Up Down & Across February 11-12, 2014

213

SLAC - KEK: ISG8 Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Agenda Agenda ISG8 Home Page Working Groups: WG1: Parameters, Design, Instrumentation and Tuning, Bldg.212 Cascades Conference Rm. WG2: Damping Rings and ATF, Bldg.214 Fuji Conference Rm WG3: RF Sources, Orange Rm (half) WG4:Structures, Orange Rm (half) WG5: Ground Motion; Site Requirements and Investigations, Bldg.281 Conventional Facilities Rm. Monday: 09:00 Plenary Sessions (Auditorium) Welcome - J. Dorfan Views from KEK - K. Takata TRC News - G. Loew Goals for ISG-8 - D. Burke / N. Toge Working Group Plans (5 min ea) - WG Conveners 11:00 Working Group Sessions 12:00 Lunch 13:30 Working Group Sessions Tuesday: 09:00 Daily Schedule Update (Orange Rm) - WG Conveners (5min ea) 09:30 Working Group Sessions 12:00 Lunch 13:30 Working Group Sessions Wednesday:

214

Efficient real-time divisible load scheduling  

Science Conference Proceedings (OSTI)

Providing QoS and performance guarantees to arbitrarily divisible loads has become a significant problem for many cluster-based research computing facilities. While progress is being made in scheduling arbitrarily divisible loads, current approaches ... Keywords: Arbitrarily divisible loads, Cluster computing, Real-time computing, Scheduling efficiency

Anwar Mamat; Ying Lu; Jitender Deogun; Steve Goddard

2012-12-01T23:59:59.000Z

215

Airport Gate Scheduling with Time Windows  

Science Conference Proceedings (OSTI)

In contrast to the existing airport gate assignment studies where flight have fixed schedules, we consider the more realistic situation where flight arrival and departure times can change. Although we minimize walking distances (or travel time) in our ... Keywords: aircraft gate scheduling, memetic algorithm, tabu search

A. Lim; B. Rodrigues; Y. Zhu

2005-09-01T23:59:59.000Z

216

Scheduling under Precedence, Communication, and Energy Constraints  

E-Print Network (OSTI)

We consider the problem of scheduling a set of $n$ tasks on $m$ processors under precedence, communication, and global system energy constraints to minimize makespan. We extend existing scheduling models to account for energy usage and give convex programming algorithms that yield essentially the same results as existing algorithms that do not consider energy, while adhering to a strict energy bound.

Felber, David

2011-01-01T23:59:59.000Z

217

Domestic load scheduling using genetic algorithms  

Science Conference Proceedings (OSTI)

An approach using a genetic algorithm to optimize the scheduling of domestic electric loads, according to technical and user-defined constraints and input signals, is presented and illustrative results are shown. The aim is minimizing the end-user's ... Keywords: automated energy management, domestic load scheduling, electric loads, genetic algorithms

Ana Soares; llvaro Gomes; Carlos Henggeler Antunes; Hugo Cardoso

2013-04-01T23:59:59.000Z

218

Heavy Tails: Performance Models and Scheduling Disciplines  

E-Print Network (OSTI)

Heavy Tails: Performance Models and Scheduling Disciplines Sindo N´u~nez-Queija based on joint ITC´u~nez-Queija CWI & TU/e #12;Heavy Tails: Performance Models and Scheduling Disciplines Part I ­ Introduction and Methodology Tales to tell: · traffic measurements and statistical analysis · traffic modeling · heavy

Núñez-Queija, Rudesindo

219

Perception of a building construction schedule  

Science Conference Proceedings (OSTI)

Evaluating a schedule means making a judgment about the schedule after thinking carefully about its duration, cost, and the probable quality of its deliverable product. Despite recent advances in 4D visualization, (i.e., 3D building geometry + time), ... Keywords: 4D visualization, building construction planning, decision support systems, perception model

Kais Samkari, Ralf Gnerlich, Volkhard Franz

2013-04-01T23:59:59.000Z

220

Instruction scheduling using MAX-MIN ant system optimization  

Science Conference Proceedings (OSTI)

Instruction scheduling is a fundamental step for mapping an application to a computational device. It takes a behavioral application specification and produces a schedule for the instructions onto a collection of processing units. The objective is to ... Keywords: MAX-MIN ant system, force-directed scheduling, instruction scheduling, list scheduling

Gang Wang; Wenrui Gong; Ryan Kastner

2005-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Clinch River Breeder Reactor Plant Project: construction schedule  

SciTech Connect

The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule.

Purcell, W.J.; Martin, E.M.; Shivley, J.M.

1982-01-01T23:59:59.000Z

222

Inspection/Sampling Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection/Sampling Schedule Inspection/Sampling Schedule Inspection/Sampling Schedule Site Inspection and Water Sampling Schedules Note: The following schedules are subject to change without prior notice and will be updated periodically. Site Name Inspection Date Sampling Week Ambrosia Lake, NM, Disposal Site August 18, 2014 November 20, 2013 Bluewater, NM, Disposal Site August 18, 2014 November 20, 2013 January 28, 2014 May 12, 2014 Boiling Nuclear Superheater (BONUS), PR, Decommissioned Reactor Site Next event 2017 Burrell, PA, Disposal Site December 9, 2013 November 20, 2013 Canonsburg, PA, Disposal Site December 9, 2013 November 19, 2013 Durango, CO, Disposal Site May 19, 2014 June 2, 2014 Durango, CO, Processing Site N/A June 2, 2014 September 1, 2014 Edgemont, SD, Disposal Site June 23, 2014 N/A

223

EIA RECORDS SCHEDULE (EIARS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIA RECORDS SCHEDULE (EIARS) EIA RECORDS SCHEDULE (EIARS) EIA RECORDS SCHEDULE (EIARS) The establishment of the Energy Information Administration (EIA) as an independent statistical agency within the U.S. Department of Energy in 1977 was a result of enabling legislation that charged the EIA to maintain a comprehensive data and information program relevant to energy resources and reserves, energy production, energy demand, energy technologies, and related financial and statistical information relevant to the adequacy of energy resources to meet the Nations demands in the near and longer term future EIA RECORDS SCHEDULE (EIARS) More Documents & Publications Request For Records Disposition ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC, ARCHITECTURAL, ENGINEERING, AND FACILITY MANAGEMENT RECORDS

224

Real-time scheduling with regenerative energy  

E-Print Network (OSTI)

This paper investigates real-time scheduling in a system whose energy reservoir is replenished by an environmental power source. The execution of tasks is deemed primarily energy-driven, i.e., a task may only respect its deadline if its energy demand can be satisfied early enough. Hence, a useful scheduling policy should account for properties of the energy source, capacity of the energy storage as well as power dissipation of the single tasks. We show that conventional scheduling algorithms (like e.g. EDF) are not suitable for this scenario. Based on this motivation, we state and prove optimal scheduling algorithms that jointly handle constraints from both energy and time domain. Furthermore, an offline schedulability test for a set of periodic or even bursty tasks is presented. Finally, we validate the proposed theory by means of simulation and compare our algorithms with the classical Earliest Deadline First Algorithm. 1.

C. Moser; D. Brunelli; L. Thiele; L. Benini

2006-01-01T23:59:59.000Z

225

Simulating the scheduling of parallel supercomputer applications  

SciTech Connect

An Event Driven Simulator for Evaluating Multiprocessing Scheduling (EDSEMS) disciplines is presented. The simulator is made up of three components: machine model; parallel workload characterization ; and scheduling disciplines for mapping parallel applications (many processes cooperating on the same computation) onto processors. A detailed description of how the simulator is constructed, how to use it and how to interpret the output is also given. Initial results are presented from the simulation of parallel supercomputer workloads using Dog-Eat-Dog,'' Family'' and Gang'' scheduling disciplines. These results indicate that Gang scheduling is far better at giving the number of processors that a job requests than Dog-Eat-Dog or Family scheduling. In addition, the system throughput and turnaround time are not adversely affected by this strategy. 10 refs., 8 figs., 1 tab.

Seager, M.K.; Stichnoth, J.M.

1989-09-19T23:59:59.000Z

226

Administrative Records Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administrative Records Schedules Administrative Records Schedules Administrative Records Schedules Administrative Records Schedules NOTE: Most of the files below are in PDF, you will need Acrobat® Reader(tm) to view these files. SCHEDULE TITLE DATE LAST CHANGED AUTHORIZATION NUMBER 1 Personnel Records (pdf) 09/15/10 N1-434-98-4 2 Payroll & Pay Administration Records (pdf) 09/15/10 N1-434-98-5 3 Procurement, Supply, and Grant Records (pdf) 09/15/10 N1-434-98-6 N1-434-95-1 4 Property Disposal Records (pdf) 12/10/10 --- 5 Budget Preparation, Presentation and Apportionment Records (pdf) 12/10/10 N1-434-98-8 6 Accountable Officers' Accounts Records (pdf) 09/15/10 N1-434-98-9 7 Expenditure Accounting Records --- GRS 7 8 Stores, Plants and Cost Accounting Records --- GRS 8

227

National Windstorm Impact Reduction Program Office  

Science Conference Proceedings (OSTI)

... National Science Foundation (NSF). The program is currently lead by the Office of Science and Technology Policy (OSTP). ...

2012-05-25T23:59:59.000Z

228

Project: National Windstorm Impact Reduction Program  

Science Conference Proceedings (OSTI)

... and Data Processing Systems, Ty Parrino ... and to the International Building Code and ... of the Petrochemical Committee, Energy Division (committee ...

2013-01-02T23:59:59.000Z

229

Manufacturing Impact: Energy Reduction through Microwave Assist ...  

Science Conference Proceedings (OSTI)

Calcining trials have demonstrated that lower temperature and shorter dwell times are achievable using MAT, leading to significant energy savings. Results of ...

230

Performance analysis of dynamic workflow scheduling in multicluster grids  

Science Conference Proceedings (OSTI)

Scientists increasingly rely on the execution of workflows in grids to obtain results from complex mixtures of applications. However, the inherently dynamic nature of grid workflow scheduling, stemming from the unavailability of scheduling information ... Keywords: grid scheduling, performance evaluation, workflows

Ozan Sonmez; Nezih Yigitbasi; Saeid Abrishami; Alexandru Iosup; Dick Epema

2010-06-01T23:59:59.000Z

231

NRC comprehensive records disposition schedule. Revision 3  

Science Conference Proceedings (OSTI)

Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

NONE

1998-02-01T23:59:59.000Z

232

Rate Schedule CV-RFS4  

NLE Websites -- All DOE Office Websites (Extended Search)

RFS4 RFS4 (Supersedes Schedule CV-RFS3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR REGULATION AND FREQUENCY RESPONSE SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Regulation and Frequency Response Service (regulation). Character and Conditions of Service: Regulation is necessary to provide for the continuous balancing of resources and interchange with load and for maintaining scheduled interconnection frequency at 60-cycles per second. Formula Rate: The formula rate for regulation includes three components:

233

PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES...  

NLE Websites -- All DOE Office Websites (Extended Search)

PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS) PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS) This document lists the procedures for...

234

Y-12 builds capacity to meet nuclear testing schedule - Or: ...  

NLE Websites -- All DOE Office Websites (Extended Search)

builds capacity to meet nuclear testing schedule - Or: Increasing capacity to meet nuclear testing schedule (title as it appeared in The Oak Ridger) The continuing high volume...

235

Topic Index to the DOE Administrative Records Disposition Schedules...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Topic Index to the DOE Administrative Records Disposition Schedules Topic Index to the DOE Administrative Records Disposition Schedules Topic Index to the DOE Administrative...

236

A sink-n-hoist framework for leakage power reduction  

Science Conference Proceedings (OSTI)

Power leakage constitutes an increasing fraction of the total power consumption in modern semiconductor technologies. Recent research efforts have tried to integrate architecture and compiler solutions to employ power-gating mechanisms to reduce leakage ... Keywords: balanced scheduling, compilers for low power, data-flow analysis, leakage power reduction, power-gating mechanisms

Yi-Ping You; Chung-Wen Huang; Jenq Kuen Lee

2005-09-01T23:59:59.000Z

237

SF6 Emission Reduction  

NLE Websites -- All DOE Office Websites (Extended Search)

SF 6 Emission Reduction Steve Lowder Bonneville Power Administration 2010.09 slide 1 Emission Reduction Emission Reduction is the reason for why we do all of this - because:...

238

Definition: Scheduling Path | Open Energy Information  

Open Energy Info (EERE)

Scheduling Path Scheduling Path Jump to: navigation, search Dictionary.png Scheduling Path The Transmission Service arrangements reserved by the Purchasing-Selling Entity for a Transaction.[1] Related Terms transmission lines, Purchasing-Selling Entity, Transmission Service, transmission line References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Scheduling_Path&oldid=480301" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation:

239

Definition: Interchange Schedule | Open Energy Information  

Open Energy Info (EERE)

Schedule Schedule Jump to: navigation, search Dictionary.png Interchange Schedule An agreed-upon Interchange Transaction size (megawatts), start and end time, beginning and ending ramp times and rate, and type required for delivery and receipt of power and energy between the Source and Sink Balancing Authorities involved in the transaction.[1] Related Terms Interchange transaction References ↑ Glossary of Terms Used in Reliability Standards An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Interchange_Schedule&oldid=480572" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link

240

DOE HQ Shuttle Bus Route and Schedule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Shuttle Bus Route and Schedule Shuttle Bus Route and Schedule The DOE Shuttle Buses follow the same schedules between the two main Headquarters locations, Forrestal and Germantown. The buses start their routes at each Headquarters facility at the same times, see the schedule below. The subsequent stops at the other facilities are relative to the departure time of each route. Headquarters employees are reminded of the statutory provisions that authorize and limit the use of the shuttle bus service. Specific authority for the use of appropriated funds to pay for transportation for official purposes is contained in section 1344(a)(1) of Title 31, U.S. Code. Use of this transportation for any other purpose is

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Undergraduate Program Time Limits and Work Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Time Limits and Work Schedules Time Limits and Work Schedules Undergraduate Program Time Limits and Work Schedules Point your career towards LANL: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Contact Student Programs (505) 665-8899 Email Time limits The length of participation in the undergraduate program is limited to a maximum of six years for students pursuing a bachelor's degree and three years for students pursuing an associate's degree. Work schedules Year-round students Students participating in some special undergraduate programs, post-baccalaureate appointments, post-master's appointments, and GRA students working on a thesis or dissertation are excluded from the 30-hour per week work restriction.

242

Graduate Program Time Limits and Work Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Time Limits and Work Schedules Time Limits and Work Schedules Graduate Program Time Limits and Work Schedules Point your career towards LANL: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Contact Student Programs (505) 665-8899 Email Time Limits The length of participation in the graduate program is limited as follows: With a bachelor's pursuing a master's degree: 4 years With a bachelor's pursuing a PhD: 7 years With a master's pursuing a second master's degree: 2 years With a master's pursuing a PhD: 4 years With a master's pursuing a master's and PhD in a new field: 6 years Students may remain in the GRA program for up to three months after receiving their PhD. Work schedules Year-round students Students participating in the MBA program, post-baccalaureate appointments,

243

Rate Schedule CV-EID4  

NLE Websites -- All DOE Office Websites (Extended Search)

EID4 EID4 (Supersedes Schedule CV-EID3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR ENERGY IMBALANCE SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Energy Imbalance (EI) service. Character and Conditions of Service: EI is provided when a difference occurs between the scheduled and the actual delivery of energy to a load within the Sub-Balancing Authority (SBA) over an hour or in accordance with approved policies and procedures. The deviation, in megawatts, is the net scheduled amount of

244

Definition: Scheduling Entity | Open Energy Information  

Open Energy Info (EERE)

Interchange Schedule References Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline...

245

Definition: Net Scheduled Interchange | Open Energy Information  

Open Energy Info (EERE)

Interchange Schedule References Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline...

246

DOE Announces New WIPP Tour Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Announces New WIPP Tour Schedule CARLSBAD, N.M., March 14, 2001 - The U.S. Department of Energy's (DOE) Carlsbad Field Office today announced changes in the public tour program at...

247

Approximation algorithms for stochastic scheduling problems  

E-Print Network (OSTI)

In this dissertation we study a broad class of stochastic scheduling problems characterized by the presence of hard deadline constraints. The input to such a problem is a set of jobs, each with an associated value, processing ...

Dean, Brian C. (Brian Christopher), 1975-

2005-01-01T23:59:59.000Z

248

Provably Efficient Adaptive Scheduling for Parallel Jobs  

E-Print Network (OSTI)

Scheduling competing jobs on multiprocessors has always been an important issue for parallel and distributed systems. The challenge is to ensure global, system-wide efficiency while offering a level of fairness to user ...

He, Yuxiong

249

Batch Queues and Scheduling Policies on Edison  

NLE Websites -- All DOE Office Websites (Extended Search)

can start even if requested walltime extends past a scheduled maintenance. Note: on Edison you can type qstat -Qf command for a more detailed view of the queue configuration....

250

DUF6 Conversion Facility EIS Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Depleted UF6 Conversion Facility EISs Schedule The final EISs for the DUF6 Conversion Facilities have been completed, and are available through this web site. The RODs are...

251

Monitoring Building Systems for Schedule Compliance  

SciTech Connect

As Pacific Northwest National Laboratory (PNNL) initiated a Core Business Hours program, it became a challenge to ensure that the hundreds of systems campus wide were operating within their programmed schedules. Therefore, a collaborative exchange between PNNL operations and PNNL researchers developing the Decision Support for Operations and Maintenance (DSOM) software package was initiated to create a tool to solve this problem. This new DSOM tool verifies systems are operating within scheduled operation times by polling Building Automation and Control Network (BACnet) identifiers of systems on/off or command statuses. The tool records the time spent in operation state (ON) and totalizes each system over a rolling 7-day period, highlighting systems that are running over the scheduled hours. This snapshot view allows building management to look quickly at the entire campus to ensure that systems are not operating beyond their scheduled hours.

Jensen, Andrew M.; Belew, Shan T.

2013-02-19T23:59:59.000Z

252

Railway scheduling with declarative constraint programming  

Science Conference Proceedings (OSTI)

Simulation of train scheduling is a highly complex problem. Classical methods in this field are mainly designed for conflict resolution, which means that a solution or partial solution is generated and subsequently tested to determine whether the conditions ...

Ulrich Geske

2005-10-01T23:59:59.000Z

253

Roasting, Reduction and Smelting  

Science Conference Proceedings (OSTI)

Mar 6, 2013 ... Researches on Reduction Roasting of Low-grade Manganese Oxide Ores Using Biomass Charcoal as Reductant: Yuanbo Zhang1; Daoxian...

254

Gas pressure reduction circuits  

Science Conference Proceedings (OSTI)

This note describes passive pressure reduction devices for use with sensitive instruments. Two gas circuits are developed which not only provide a pressure reduction under flow demand

D. W. Guillaume; D. DeVries

1989-01-01T23:59:59.000Z

255

Laxity dynamics and LLF schedulability analysis on multiprocessor platforms  

Science Conference Proceedings (OSTI)

LLF (Least Laxity First) scheduling, which assigns a higher priority to a task with a smaller laxity, has been known as an optimal preemptive scheduling algorithm on a single processor platform. However, little work has been made to illuminate its characteristics ... Keywords: LLF (Least Laxity First), Laxity dynamics, Multiprocessor platforms, Real-time scheduling, Schedulability analysis

Jinkyu Lee; Arvind Easwaran; Insik Shin

2012-11-01T23:59:59.000Z

256

Energy-efficient scheduling for multiple access in wireless sensor networks: A job scheduling method  

Science Conference Proceedings (OSTI)

With the objective to minimize the transmission energy cost, we consider the energy-efficient scheduling problem in a single hop multi-access data gathering network. We first prove by theoretical induction that transmitting with reduced powers decreases ... Keywords: Job scheduling, Multiple access channel, Polymatroid analysis, Wireless sensor networks

Xiaomao Mao; Huifang Chen; Peiliang Qiu; Zhaoyang Zhang

2010-09-01T23:59:59.000Z

257

GATS 1.0: a novel GA-based scheduling algorithm for task scheduling on heterogeneous processor nets  

Science Conference Proceedings (OSTI)

We present a novel GA-based scheduling algorithm for heterogeneous processor networks that succeeds in generating task schedules with completion times that are 7% and 10.1% shorter than those produced by two of the best existing scheduling algorithms ... Keywords: genetic algorithm, heterogeneous systems, parallel processing, scheduling

Mohammad Daoud; Nawwaf Kharma

2005-06-01T23:59:59.000Z

258

EM Quality Assurance Assessment Schedule FY 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DR. STFDlN L. KRAHN DR. STFDlN L. KRAHN DEPUTY ASSlS SAFETY ENVIRONhtENTAL MANAGEMENT SUBJECT: U p d a t e d F i Year 2010 Environmental Mmagemmt Quality Assurance Assessment Schedule AWhed for planuing and coordination purposes is t h e updated Ql&ty Amtrance {OA) asesmmt schedule for the remainder of fiscal year $Y) 2010. . - , The schedule is organized per the various types of QA asmmum@ that will k led by the Office of S t a n e and Quality Assurance (EM-23) or the Field elements. Please provide your feedbadc on the suggested self-atxwssment dates by Monday, Apd 12,2010 (item 2, below). Tht scope a n d tim'mg of plaoned asseasments are designed to be relevant, timely, and & I value to enhaace QA performame of specific projects. EM-23 has developed the attached oversight prioritization methodology plan that takes into

259

Rate Schedule CV-NWT5  

NLE Websites -- All DOE Office Websites (Extended Search)

NWT5 NWT5 (Supersedes Schedule CV-NWT4) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR NETWORK INTEGRATION TRANSMISSION SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Central Valley Project (CVP) Network Integration Transmission Service (NITS). Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points of delivery. This service includes scheduling and system control and dispatch service needed to

260

Maglev guideway cost and construction schedule assessment  

SciTech Connect

A summary of construction cost and scheduling information is presented for four maglev guideway designs on an example route from Baltimore, MD to Newark, NJ. This work results from the National Maglev Initiative (NMI), a government-industry effort from 1989 to 1994. The system design concepts used as a basis for developing cost and construction scheduling information, were submitted by four industry consortia solely for this analysis, and represent their own unpublished designs. The detailed cost and construction schedule analyses cover the main guideway only. A summary estimate was made for stations, power distribution systems, maintenance facilities, and other types of infrastructure. The results of the analyses indicate a number of design aspects which must receive further consideration by future designers. These aspects will affect the practical and economic construction and long-term maintenance of a high-speed maglev guideway.

Plotkin, D.; Kim, S. [Army Construction Engineering Research Lab., Champaign, IL (United States)

1997-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Production Scheduling with Energy Efficiency Constraints  

E-Print Network (OSTI)

This research is motivated by a real world production scheduling problem in a continuous manufacturing system involving multiple objectives, multiple products and multiple processing lines with various inventory, production and energy efficiency constraints. Because of the conflicting objectives, an optimization approach is considered as not feasible by the plant management. Given a customer demand forecast, three practical heuristic algorithms are developed to generate daily production schedules for three conflicting objectives: minimize shipment delays, minimize average inventory levels, and minimize product switch-over to avoid energy waste. Since each heuristic is designed to give priority to one of the three conflicting objectives, none of them is absolutely superior to the other algorithms in all aspects. However, the management can assign weights to each of the three objectives to identify the schedule that minimizes the total cost index.

Lee, J.; Kozman, T. A.; Wang, X.

2007-01-01T23:59:59.000Z

262

Adaptable search neighborhoods for Resource Constrained Scheduling  

E-Print Network (OSTI)

Resource Constrained Scheduling problem (RCSP) is a scheduling problem in which each activity may require more than one resource and resources may not be available in the same quantity throughout the planning period. This thesis describes a methodology for RCS that can be easily adapted to consider different regular measures of performance. The solution approach is based on the generation of strong search neighborhoods using methods recently published in the literature. Computational results are encouraging when searching these spaces using simple local search techniques and genetic algorithms. Close-to-optimal solutions are found for standard problems from the literature. A special case of RCSP, the flexible flow line (FFL) scheduling problem, is also studied. Computational results on some real industrial data produced close-to-optimal solutions. In both cases (RCS and FFL), the performance measures used to the test the procedures are makespan and mean tardiness.

Balakrishnan, Ramamoorthy

1993-01-01T23:59:59.000Z

263

Multi-Site Energy Reduction Through Teamwork  

E-Print Network (OSTI)

Energy Teams have been established at seven BASF locations to facilitate implementation of the findings from the 2003 and 2004 Energy Audits conducted at these Sites. These Teams were charged with implementation, progress tracking, and management reporting. The Teams are comprised of engineers, technicians, and operators with various backgrounds and responsibilities. The diversity of the Teams was a factor in their success through the willingness to challenge various conditions. The Teams addressed hundreds of Energy Conservation Opportunities (ECOs) to set priorities and create implementation schedules. Many of the ECOs were implemented with little or no cost to BASF. The final Energy Audit of 2004 was conducted in July and the Energy Team for that Site was still able to implement a 7% energy reduction as compared to 2003. The combined results from these seven Energy Teams represent a 5.8% reduction in energy consumption, for these facilities, within BASF in 2004, as compared to 2003, a total savings of slightly more than $4,900k. The top ten items implemented were: 1. Cogeneration load following 2. Creation of a 60 psig steam header between blocks to utilize waste steam 3. Elimination of WWTP steam 4. Incinerator process control 5. Flare switched to stand-by 6. Acid water specification 7. Nitrogen consumption reduction 8. Compressed air optimization 9. Boiler minimum fire set-point reduction 10. Leak reduction

Theising, T

2008-01-01T23:59:59.000Z

264

Energy Aware Scheduling for Weighted Completion Time and Weighted Tardiness  

E-Print Network (OSTI)

The ever increasing adoption of mobile devices with limited energy storage capacity, on the one hand, and more awareness of the environmental impact of massive data centres and server pools, on the other hand, have both led to an increased interest in energy management algorithms. The main contribution of this paper is to present several new constant factor approximation algorithms for energy aware scheduling problems where the objective is to minimize weighted completion time plus the cost of the energy consumed, in the one machine non-preemptive setting, while allowing release dates and deadlines.Unlike previous known algorithms these new algorithms can handle general job-dependent energy cost functions, extending the application of these algorithms to settings outside the typical CPU-energy one. These new settings include problems where in addition, or instead, of energy costs we also have maintenance costs, wear and tear, replacement costs, etc., which in general depend on the speed at which the machine r...

Carrasco, Rodrigo A; Stein, Cliff

2011-01-01T23:59:59.000Z

265

Aluminum Reduction Technology  

Science Conference Proceedings (OSTI)

Increasing the Power Modulation Window of Aluminium Smelter Pots with Shell Heat Exchanger Technology Initiatives To Reduction Of Aluminum Potline...

266

Cobalt Reduction Sourcebook  

Science Conference Proceedings (OSTI)

Many nuclear utilities have a cobalt reduction plan in place for each plant. However, establishing a cobalt reduction plan is a challenging and often plant-specific task. This document seeks to provide a general approach to not only minimizing elemental cobalt transport to Boiling Water Reactors (BWR) and Pressurized Water Reactors (PWR) reactors, but also to help prioritize cobalt reduction actions for optimum dose rate reduction.

2010-12-21T23:59:59.000Z

267

Aluminum Reduction Technology  

Science Conference Proceedings (OSTI)

Jul 31, 2011 ... GHG Measurement and Inventory for Aluminum Production HEX Retrofit Enables Smelter Capacity Expansion HF Emission Reduction from...

268

Global Threat Reduction Initiative | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Global Threat Reduction Global Threat Reduction ... Global Threat Reduction Initiative The Global Threat Reduction Initiative's Alarm Response Training provides training in the area of response for radiological events and provides an opportunity for the security forces, health and safety personnel, and other responsible parties such as the supporting local law enforcement to develop, discuss, and exercise their own tactics, techniques, procedures, and protocols when responding to a theft and/or sabotage event involving radioactive materials of significance. This voluntary program is free, and all expenses (travel, meals, etc.), other than the trainee's training time, will be paid by the GTRI Domestic Threat Reduction Program. Facilities participating in the Domestic Security Program are scheduled for

269

MCNP variance reduction overview  

Science Conference Proceedings (OSTI)

The MCNP code is rich in variance reduction features. Standard variance reduction methods found in most Monte Carlo codes are available as well as a number of methods unique to MCNP. We discuss the variance reduction features presently in MCNP as well as new ones under study for possible inclusion in future versions of the code.

Hendricks, J.S.; Booth, T.E.

1985-01-01T23:59:59.000Z

270

Crosswalk between DOERS and Admin Schedules  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2/00 2/00 Cross-Walk -DOERS to Admin Sched rev2.wpd DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules DOERS Item Number Description of Records DOE Administrative or Programmatic Schedule Number / Item NARA Case Number DOERS 1, Medical, Health and Safety Records DOERS 1, Item 1a Safety Management Records DOE Admin18, Item 11.1a, NC-326-75-2 DOERS 1, item 1 (b, c, d, & e) Safety Management Records DOE Admin 18, item 11.1 (c, d, e & f) II NNA-1023(2) II NNA-310(6) II NNA-1023(3) II NNA-409(25) DOERS 1, Item 2 Fire Unit Records DOE Admin18 ,Item 11.4 (a thru g) NC-430-76-2(3) II NNA-1858(1B) II NNA-2939 II NNA-1858(1C) II NNA-1858(E) II NNA-1858(1F) DOERS 1, Item 3 Medical or Health Research Project Case Files R & D Programmatic Schedule

271

Exploiting Statically Schedulable Regions in Dataflow Programs  

Science Conference Proceedings (OSTI)

Dataflow descriptions have been used in a wide range of Digital Signal Processing (DSP) applications, such as multi-media processing, and wireless communications. Among various forms of dataflow modeling, Synchronous Dataflow (SDF) is geared towards ... Keywords: Cal, DIF, Dataflow, Multicore processors, Quasi-static scheduling

Ruirui Gu; Jrn W. Janneck; Mickal Raulet; Shuvra S. Bhattacharyya

2011-04-01T23:59:59.000Z

272

Battery-aware scheduling inwireless mesh networks  

Science Conference Proceedings (OSTI)

Wireless mesh networks recently emerge as a flexible, low-cost and multipurpose networking platform with wired infrastructure connected to the Internet. A critical issue in mesh networks is to maintain network activities for a long lifetime with high ... Keywords: battery models, battery-awareness, energy efficiency, lifetime optimization, mesh routers, power scheduling, wireless mesh networks

Chi Ma; Zhenghao Zhang; Yuanyuan Yang

2008-04-01T23:59:59.000Z

273

Declarative scheduling in highly scalable systems  

Science Conference Proceedings (OSTI)

In modern architectures based on Web Services or Cloud Computing, a very large number of user requests arrive concurrently and has to be scheduled for execution constrained by correctness criteria, service-level agreements etc. The state of the art is ...

Christian Tilgner

2010-03-01T23:59:59.000Z

274

Incentivizing Advanced Load Scheduling in Smart Homes  

Science Conference Proceedings (OSTI)

In recent years, researchers have proposed numerous advanced load scheduling algorithms for smart homes with the goal of reducing the grid's peak power usage. In parallel, utilities have introduced variable rate pricing plans to incentivize residential ... Keywords: Battery, Electricity, Energy, Grid

Ye Xu, David Irwin, Prashant Shenoy

2013-11-01T23:59:59.000Z

275

Adaptive Battery Charge Scheduling with Bursty Workloads  

E-Print Network (OSTI)

1 Adaptive Battery Charge Scheduling with Bursty Workloads Dylan Lexie , Shan Lin, and Jie Wu.wu@temple.edu Abstract--Battery-powered wireless sensor devices need to be charged to provide the desired functionality after deployment. Task or even device failures can occur if the voltage of the battery is low

Wu, Jie

276

Supporting microthread scheduling and synchronisation in CMPs  

Science Conference Proceedings (OSTI)

Chip multiprocessors (CMPs) hold great promise for achieving scalability in future systems. Microthreaded CMPs add a means of exploiting legacy code in such systems. Using this model, compilers generate parametric concurrency from sequential source code, ... Keywords: CMPs, microgrids, microthreads, register files, schedulers

Ian Bell; Nabil Hasasneh; Chris Jesshope

2006-08-01T23:59:59.000Z

277

User-sensitive scheduling of home appliances  

Science Conference Proceedings (OSTI)

Demand response (DR) programs encourage end-use customers to alter their power consumption in response to DR events such as change in real-time electricity prices. Facilitating household participation in DR programs is essential as the residential sector ... Keywords: demand response, energy consumption scheduling, home automation, smart grids

Tanuja Bapat; Neha Sengupta; Sunil Kumar Ghai; Vijay Arya; Yedendra Babu Shrinivasan; Deva Seetharam

2011-08-01T23:59:59.000Z

278

Timelines as summaries of popular scheduled events  

Science Conference Proceedings (OSTI)

Known events that are scheduled in advance, such as popular sports games, usually get a lot of attention from the public. Communications media like TV, radio, and newspapers will report the salient aspects of such events live or post-hoc for general ... Keywords: football, rugby, soccer, sports, summaries, timelines, world cup

Omar Alonso, Kyle Shiells

2013-05-01T23:59:59.000Z

279

Truck Driver Scheduling in the European Union  

Science Conference Proceedings (OSTI)

Since April 2007 working hours of truck drivers in the European Union are controlled by regulation (EC) No. 561/2006. According to the new regulation, road transport undertakings must organise the work of drivers in a way that drivers are able to comply ... Keywords: drivers' working hours, regulation (EC) No. 561/2006, vehicle scheduling

Asvin Goel

2010-11-01T23:59:59.000Z

280

Feasible distributed CSP models for scheduling problems  

Science Conference Proceedings (OSTI)

A distributed constraint satisfaction problem (DisCSP) is a CSP in which variables and constraints are distributed among multiple automated agents. Many researchers have developed techniques for solving DisCSPs. They assume for simplicity that each agent ... Keywords: Constraint satisfaction, Distributed CSP, Holonic system, Multi-agent system, Scheduling

Miguel A. Salido; Adriana Giret

2008-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Appliance Commitment for Household Load Scheduling  

Science Conference Proceedings (OSTI)

This paper presents a novel appliance commitment algorithm that schedules thermostatically-controlled household loads based on price and consumption forecasts considering users comfort settings to meet an optimization objective such as minimum payment or maximum comfort. The formulation of an appliance commitment problem was described in the paper using an electrical water heater load as an example. The thermal dynamics of heating and coasting of the water heater load was modeled by physical models; random hot water consumption was modeled with statistical methods. The models were used to predict the appliance operation over the scheduling time horizon. User comfort was transformed to a set of linear constraints. Then, a novel linear, sequential, optimization process was used to solve the appliance commitment problem. The simulation results demonstrate that the algorithm is fast, robust, and flexible. The algorithm can be used in home/building energy-management systems to help household owners or building managers to automatically create optimal load operation schedules based on different cost and comfort settings and compare cost/benefits among schedules.

Du, Pengwei; Lu, Ning

2011-06-30T23:59:59.000Z

282

Federal Technical Capability Panel Conference Call Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Capability Panel Conference Call Schedule CY 2013 Time: 11:00 an -12:00pm (EST) * 10:00-11:00 am (CST) * 9:00-10:00 am (MST) * 8:00-9:00am (PST) Date Call-In Number June 19, 2013...

283

Aluminum Reduction Technology  

Science Conference Proceedings (OSTI)

Jul 31, 2012... potline management (e.g. power modulation, scheduling, logistics), equipment, ... Fundamentals: thermal/electric/magnetic/flow modelling, electrolyte ... A Methodology Based on Risk Assessment and Numerical Simulation ... The Study and Applications of Modern Potline Fume Treatment Plant (FTP).

284

Optimized Hypervisor Scheduler for Parallel Discrete Event Simulations on Virtual Machine Platforms  

Science Conference Proceedings (OSTI)

With the advent of virtual machine (VM)-based platforms for parallel computing, it is now possible to execute parallel discrete event simulations (PDES) over multiple virtual machines, in contrast to executing in native mode directly over hardware as is traditionally done over the past decades. While mature VM-based parallel systems now offer new, compelling benefits such as serviceability, dynamic reconfigurability and overall cost effectiveness, the runtime performance of parallel applications can be significantly affected. In particular, most VM-based platforms are optimized for general workloads, but PDES execution exhibits unique dynamics significantly different from other workloads. Here we first present results from experiments that highlight the gross deterioration of the runtime performance of VM-based PDES simulations when executed using traditional VM schedulers, quantitatively showing the bad scaling properties of the scheduler as the number of VMs is increased. The mismatch is fundamental in nature in the sense that any fairness-based VM scheduler implementation would exhibit this mismatch with PDES runs. We also present a new scheduler optimized specifically for PDES applications, and describe its design and implementation. Experimental results obtained from running PDES benchmarks (PHOLD and vehicular traffic simulations) over VMs show over an order of magnitude improvement in the run time of the PDES-optimized scheduler relative to the regular VM scheduler, with over 20 reduction in run time of simulations using up to 64 VMs. The observations and results are timely in the context of emerging systems such as cloud platforms and VM-based high performance computing installations, highlighting to the community the need for PDES-specific support, and the feasibility of significantly reducing the runtime overhead for scalable PDES on VM platforms.

Yoginath, Srikanth B [ORNL; Perumalla, Kalyan S [ORNL

2013-01-01T23:59:59.000Z

285

To Schedule or to Execute: Decision Support and PerformanceImplications  

Science Conference Proceedings (OSTI)

This paper addresses a fundamental trade-off in dynamic scheduling between the cost of scheduling and the quality of the resulting schedules. The time allocated to scheduling must be controlled explicitly, in order to obtain good-quality schedules ... Keywords: dynamic scheduling, real-time tasks, scheduling time

Babak Hamidzadeh; Yacine Atif; Krithi Ramamritham

1999-05-01T23:59:59.000Z

286

2013-2014 Student Health Services Health Promotion GA IMPACT Program Instructor  

E-Print Network (OSTI)

schedule. · Ability to conduct research and work on program development2013-2014 Student Health Services ­ Health Promotion GA IMPACT Program Description The IMPACT program seeks to provide students with education and feedback

Tullos, Desiree

287

Effects of a shortened depreciation schedule on the investment costs for combined heat and power  

Science Conference Proceedings (OSTI)

We investigate and compare several generic depreciation methods to assess the effectiveness of possible policy measures with respect to the depreciation schedules for investments in combined heat and power plants in the United States. We assess the different depreciation methods for CHP projects of various sizes (ranging from 1 MW to 100 MW). We evaluate the impact of different depreciation schedules on the tax shield, and the resulting tax savings to potential investors. We show that a shorter depreciation cycle could have a substantial impact on the cost of producing power, making cogeneration more attractive. The savings amount to approximately 6-7 percent of capital and fixed operation and maintenance costs, when changing from the current system to a 7 year depreciation scheme with switchover from declining balance to straight line depreciation. Suggestions for further research to improve the analysis are given.

Kranz, Nicole; Worrell, Ernst

2001-11-15T23:59:59.000Z

288

Empirical Tracking and Analysis of the Dynamics in Activity Scheduling and Schedule Execution  

E-Print Network (OSTI)

R. G. (2004) Real-time Tracking of Activity Scheduling/GIS) viii ABSTRACT Empirical Tracking and Analysis of theSanta Barbara Empirical Tracking and Analysis of the

Zhou, Jianyu Jack

2006-01-01T23:59:59.000Z

289

STAR-Scheduler: A Batch Job Scheduler for Distributed I/O Intensive Applications  

E-Print Network (OSTI)

We present the implementation of a batch job scheduler designed for single-point management of distributed tasks on a multi-node compute farm. The scheduler uses the notion of a meta-job to launch large computing tasks simultaneously on many nodes from a single user command. Job scheduling on specific computing nodes is predicated on the availability of user specified data files co-located with the CPUs where the analysis is meant to take place. Large I/O intensive data analyses may thus be efficiently conducted on multiple CPUs without the limitations implied by finite LAN or WAN bandwidths. Although this Scheduler was developed specifically for the STAR Collaboration at Brookhaven National Laboratory, its design is sufficiently general, it can be adapted to virtually any other data analysis tasks carried out by large scientific collaborations.

V. Mandapaka; C. Pruneau; J. Lauret; S. Zeadally

2004-01-25T23:59:59.000Z

290

STAR-Scheduler: A Batch Job Scheduler for Distributed I/O Intensive Applications  

E-Print Network (OSTI)

We present the implementation of a batch job scheduler designed for single-point management of distributed tasks on a multi-node compute farm. The scheduler uses the notion of a meta-job to launch large computing tasks simultaneously on many nodes from a single user command. Job scheduling on specific computing nodes is predicated on the availability of user specified data files co-located with the CPUs where the analysis is meant to take place. Large I/O intensive data analyses may thus be efficiently conducted on multiple CPUs without the limitations implied by finite LAN or WAN bandwidths. Although this Scheduler was developed specifically for the STAR Collaboration at Brookhaven National Laboratory, its design is sufficiently general, it can be adapted to virtually any other data analysis tasks carried out by large scientific collaborations.

Mandapaka, V; Lauret, J; Zeadally, S

2004-01-01T23:59:59.000Z

291

ALA-1-N Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ALA-1-N Wholesale Power Rate Schedule ALA-1-N Wholesale Power Rate Schedule ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina This rate schedule shall be available to the PowerSouth Energy Cooperative. This rate schedule shall be applicable to power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters, and Richard B. Russell Projects and sold under contract between the Cooperative and the Government. This rate schedule does not apply to energy from pumping operations at the Carters and Richard B. Russell Projects. Document Available for Download ALA-1-N Rate Schedule More Documents & Publications MISS-1-N Wholesale Power Rate Schedule

292

CM-1-H Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule Area: MEAM, MDEA, and SMEPA System: CU This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency. This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CM-1-H Rate Schedule More Documents & Publications CEK-1-H Wholesale Power Rate Schedule CSI-1-H Wholesale Power Rate Schedule

293

CM-1-H Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule Area: MEAM, MDEA, and SMEPA System: CU This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency. This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CM-1-H Rate Schedule More Documents & Publications CEK-1-H Wholesale Power Rate Schedule CSI-1-H Wholesale Power Rate Schedule

294

Evaluation of Job-Scheduling Strategies for Grid Computing  

Science Conference Proceedings (OSTI)

In this paper, we discuss typical scheduling structures that occur in computational grids. Scheduling algorithms and selection strategies applicable to these structures are introduced and classified. Simulations were used to evaluate these aspects considering ...

Volker Hamscher; Uwe Schwiegelshohn; Achim Streit; Ramin Yahyapour

2000-12-01T23:59:59.000Z

295

Resource constrained scheduling problem at U.S. Naval Shipyards  

E-Print Network (OSTI)

Submarine repair schedules are some of the most complex schedules seen in project management. Repairs of a nuclear U.S. submarine are resource constrained since resources are divided among approximately thirty shops (e.g. ...

Nawara, Terrence M. (Terrence Michael)

2013-01-01T23:59:59.000Z

296

Activity based scheduling simulator for product transport using pipeline networks  

Science Conference Proceedings (OSTI)

Oil companies often rely on scheduling algorithms to increase the throughput of oil derivatives and other products which are transported through pipeline networks. This work presents an architecture for a scheduling simulator for pipeline networks, and ...

Danilo Shibata; Daniel Alfenas; Ricardo Guiraldelli; Marcos R. Pereira-Barretto; Fernando Marcellino

2012-12-01T23:59:59.000Z

297

27-ID and 35-ID Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Pentagon F 2 week look-ahead (pdf) Long Range Schedule (pdf) LOM 438 Pentagon F, Construction Schedule Dates 416 to 607 Planned construction activities, please refer to the...

298

27-ID and 35-ID Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

27-ID and 35-ID Past 27-ID and 35-ID Long Range Schedule (pdf) 27-ID and 35-ID, Construction Schedule Electrical and PSS work continues on 35-ID-B and C. Will not run the main...

299

Exhibit D: Mirant Potomac River Schedule of Unit Operations:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: January - March 2006 Docket No. EO-05-01: Exhibit D: Mirant Potomac River Schedule of Unit...

300

Impact of PV forecasts uncertainty in batteries management in microgrids  

E-Print Network (OSTI)

Impact of PV forecasts uncertainty in batteries management in microgrids Andrea Michiorri Arthur-based battery schedule optimisation in microgrids in presence of network constraints. We examine a specific case

Recanati, Catherine

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

A new model for allocating resources to scheduled lightpath demands  

Science Conference Proceedings (OSTI)

Recent research has clearly established that holding-time-aware routing-and-wavelength-assignment (RWA) schemes lead to significant improvements in resource utilization for scheduled traffic. Two different models have been proposed for scheduled traffic ... Keywords: Routing and wavelength assignment, Scheduled traffic model, Segmented sliding window model, Wavelength division multiplexing

Ying Chen; Arunita Jaekel; Ataul Bari

2011-09-01T23:59:59.000Z

302

Energy-efficient deadline scheduling for heterogeneous systems  

Science Conference Proceedings (OSTI)

Energy efficiency is a major concern in modern high performance computing (HPC) systems and a power-aware scheduling approach is a promising way to achieve that. While there are a number of studies in power-aware scheduling by means of dynamic power ... Keywords: Deadline scheduling, Energy efficiency, High performance computing, Pricing scheme

Yan Ma; Bin Gong; Ryo Sugihara; Rajesh Gupta

2012-12-01T23:59:59.000Z

303

Lot sizing and furnace scheduling in small foundries  

Science Conference Proceedings (OSTI)

A lot sizing and scheduling problem prevalent in small market-driven foundries is studied. There are two related decision levels: (1) the furnace scheduling of metal alloy production, and (2) moulding machine planning which specifies the type and size ... Keywords: Lot sizing and scheduling, Meta-heuristics, Mixed integer programming

Silvio A. de Araujo; Marcos N. Arenales; Alistair R. Clark

2008-03-01T23:59:59.000Z

304

Particle swarm optimization applied to vertical traffic scheduling in buildings  

Science Conference Proceedings (OSTI)

Vertical traffic scheduling is significant in evaluating the quality of property management. An excellent vertical traffic scheduling approach aims at enhancing the system handling capacity and reducing the waiting time, journey time and energy consumption, ... Keywords: dynamic zoning, elevator group control system, particle swarm optimization, round-trip time, vertical traffic scheduling

Zhonghua Li; Hong-Zhou Tan; Yunong Zhang

2007-09-01T23:59:59.000Z

305

Solving production scheduling problems using advanced model checking tools  

Science Conference Proceedings (OSTI)

The main scope of this paper is the implementation of a method for production scheduling, using advanced model checking tools. This method makes use of timed automata to model complex production scheduling problems such as the job-shop and the open-shop ... Keywords: distributed manufacturing, job-shops, model checking, production scheduling, timed automata

Dimitrios Panopoulos; Kostas Metaxiotis

2006-06-01T23:59:59.000Z

306

Process industry scheduling optimization using genetic algorithm and mathematical programming  

Science Conference Proceedings (OSTI)

This article addresses the problem of scheduling in oil refineries. The problem consists of a multi-product plant scheduling, with two serial machine stages--a mixer and a set of tanks--which have resource constraints and operate on a continuous flow ... Keywords: Genetic algorithm, MILP, Refining, Scheduling

F. Oliveira; S. Hamacher; M. R. Almeida

2011-10-01T23:59:59.000Z

307

Continuous Nonlinear Programming Techniques to Solve Scheduling Problems  

Science Conference Proceedings (OSTI)

One of the most known applications of Discrete Optimization is on scheduling. In contrast, one of the most known applications of Continuous Nonlinear Optimization is on the control of dynamic systems. In this paper, we combine both views, solving scheduling ... Keywords: nonlinear programming, optimal control, scheduling

Fabio D. Fagundez; Adilson E. Xavier; Joao L. D. Faco

2009-04-01T23:59:59.000Z

308

Scheduling workflow applications on processors with different capabilities  

Science Conference Proceedings (OSTI)

Efficient scheduling of workflow applications represented by weighted directed acyclic graphs (DAG) on a set of heterogeneous processors is essential for achieving high performance. The optimization problem is NP-complete in general. A few heuristics ... Keywords: DAG, Heterogeneous systems, List scheduling, Task scheduling, Workflow

Zhiao Shi; Jack J. Dongarra

2006-05-01T23:59:59.000Z

309

List scheduling with duplication for heterogeneous computing systems  

Science Conference Proceedings (OSTI)

Effective task scheduling is essential for obtaining high performance in heterogeneous computing systems (HCS). However, finding an effective task schedule in HCS, requires the consideration of the heterogeneity of computation and communication. To solve ... Keywords: DAG, Duplication, Heterogeneous computing systems, List scheduling

Xiaoyong Tang; Kenli Li; Guiping Liao; Renfa Li

2010-04-01T23:59:59.000Z

310

Optimisation-based scheduling: A discrete manufacturing case study  

Science Conference Proceedings (OSTI)

This work presents the development and implementation of a production scheduling system for an electrical appliance manufacturer. Based on recent advances in optimisation-based scheduling approaches, two different software architectures based on two ... Keywords: Discrete manufacturing, Electrical appliances, Mixed-integer linear programming, Optimization-based scheduling

Michael C. Georgiadis; Aaron A. Levis; Panagiotis Tsiakis; Ioannis Sanidiotis; Constantinos C. Pantelides; Lazaros G. Papageorgiou

2005-08-01T23:59:59.000Z

311

Resource Constraints for Preemptive Job-shop Scheduling  

Science Conference Proceedings (OSTI)

This paper presents an experimental study of constraint propagation algorithms for preemptive scheduling. We propose generalizations of non-preemptive constraint propagation techniques (based on timetables, on disjunctive constraints, and on edge-finding) ... Keywords: constraint propagation, disjunctive constraints, edge-finding, job-shop scheduling, network flows, preemptive scheduling, resource constraints, timetables

Claude Le Pape; Philippe Baptiste

1998-10-01T23:59:59.000Z

312

Jefferson Lab Science Series - Current Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Current Science Series Schedule Current Science Series Schedule Lectures are free and open to students and adults with an interest in science. All lectures begin at 7:00 pm in CEBAF Center Auditorium [Download a Map] [Locate Jefferson Lab on Google Maps] [Display a QR Code for Scanning] and last for about an hour. Seating in the CEBAF Center Auditorium and overflow area is limited to about 300 people. Seating is on a first come, first served basis. Unfortunately, people arriving once capacity has been reached will be turned away. A live video stream will be available for those not able to attend in person. Lectures will be added to the video archive for on-demand viewing upon approval from the presenter. NOTICE: For security purposes, everyone over 16 is asked to carry a photo I.D. Security guards may inspect vehicles, book bags and purses.

313

Physical Chemistry of Ionic Liquids Symposium Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

(Tentative Schedule, locations and times to be determined) (Tentative Schedule, locations and times to be determined) Sunday Morning Structure and Heterogeneity of Ionic Liquids I. James Wishart and Edward Castner Introductory Remarks Andre Pinkert Hydroxyamine ionic liquids and their properties Thomas Strassner TAAILs - Tunable Aryl-Alkyl Ionic Liquids: A new generation of ionic liquids Laura Sprunger Grubbs Thermodynamic Properties of New Generation Ionic Liquids Christopher Hardacre Prediction methods for physical properties of ionic liquids BREAK Patricia Hunt What happens when you functionalise an ionic liquid with a "silicone" side chain? Edward L Quitevis Effect of cation symmetry and nanoscale segregation on the morphology, physical properties, and low-frequency vibrational dynamics of 1,3-dialkylimidazolium cation ionic liquids

314

Rate Schedule COTP-T3  

NLE Websites -- All DOE Office Websites (Extended Search)

COTP-T3 COTP-T3 (Supersedes Schedule COTP-T2) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CALIFORNIA-OREGON TRANSMISSION PROJECT SCHEDULE OF RATE FOR POINT-TO-POINT TRANSMISSION SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving California-Oregon Transmission Project (COTP) firm and/or non-firm point-to-point (PTP) transmission service. Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points of

315

Hilton Alexandria Mark Center Shuttle Schedule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hilton Alexandria Mark Center Shuttle Schedule Hilton Alexandria Mark Center Shuttle Schedule 5000 Seminary Road, Alexandria, VA 22311 703-845-1010 The Hilton Alexandria Mark Center offers complimentary shuttle service every half hour at :00 and :30, 7 days a week. Our first departure from the hotel is 6:00 AM and our last departure from the hotel is 10:30 pm, to Pentagon City Mall/Metro (on the blue and yellow line) and Ronald Reagan Washington National Airport The van arrives at Pentagon City at approximately 10 and 40 minutes after the hour. Our last pick up is at approximately 10:40pm. Upon exiting the metro, exit left, and take the escalator outside. We pick up at the island in front of the Ritz Carlton and Fashion Center Mall. The next stop is Ronald Reagan Washington National Airport The van arrives at the airport at approximately 20 and 50 minutes after the

316

Rate Schedule CV-F13  

NLE Websites -- All DOE Office Websites (Extended Search)

F13 F13 (Supersedes Schedule CV-F12) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATES FOR BASE RESOURCE AND FIRST PREFERENCE POWER Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To the Base Resource (BR) and First Preference (FP) Power Customers. Character and Conditions of Service: Alternating current, 60-hertz, three-phase, delivered and metered at the voltages and points established by contract. This service includes the Central Valley Project (CVP) transmission (to include reactive supply and voltage control from Federal generation sources needed to support

317

Rate Schedule CV-TPT7  

NLE Websites -- All DOE Office Websites (Extended Search)

TPT7 TPT7 (Supersedes Schedule CV-TPT6) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR TRANSMISSION OF WESTERN POWER BY OTHERS Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To Western's power service customers who require transmission service by a third party to receive power sold by Western. Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points as

318

Proposal Submittal and Scheduling Procedures for Macromolecular  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Submittal and Scheduling Procedures for Macromolecular Proposal Submittal and Scheduling Procedures for Macromolecular Crystallography Beam time for macromolecular crystallography projects is obtained by submitting an SSRL Macromolecular Crystallography Proposal. This proposal is peer reviewed by the Structural Molecular Biology and Biophysics subpanel of the SSRL Proposal Review Panel (PRP) for scientific merit and rating and for criticality of synchrotron radiation use. Proposal Forms New Proposal Request Form (note: you must be a registered user to submit a proposal through our User Portal. Click on "Become a New User" link to register.) Extension Application for Macromolecular Crystallography Proposals Rapid Access Application Form Types of Proposals Proposals should be submitted under one of the following classifications.

319

Recycling, Source Reduction,  

U.S. Energy Information Administration (EIA) Indexed Site

Type:" ,"Emission Reductions by Gas in U.S. Units:" ,"Year","Carbon Dioxide (CO2)",,"Methane (CH4)",,"Perfluoromethane (CF4)",,"Perfluoroethane (C2F6)" ,,"short...

320

Aluminum Reduction Technology  

Science Conference Proceedings (OSTI)

Increased Energy Efficiency and Reduced HF Emissions with New Heat Exchanger Industrial Test of Low-voltage Energy-saving Aluminum Reduction...

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Lattice Reduction - CECM  

E-Print Network (OSTI)

lattice reduction`);" }} {PARA 0 "> " 0 "" {MPLTEXT 1 0 6 " fi;" }}{PARA 0 "> " 0 "" { MPLTEXT 1 0 13 " if dd then" }}{PARA 0 "> " 0 "" {MPLTEXT 1 0 27 " \\+ uu...

322

PAPERWORK REDUCTION ACT SUBMISSION  

U.S. Energy Information Administration (EIA)

19. Certification for Paperwork Reduction Act Submissions On behalf of this Federal agency, I certify that the collection of information encompassed ...

323

Site Specific Records Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Specific Records Schedules Site Specific Records Schedules Site Specific Records Schedules NOTE: Most of the files below are in PDF, you will need Acrobat® Reader(tm) to view these files. TITLE DATE LAST CHANGED AUTHORIZATION NUMBER AEC -- Administrative Record (pdf) 01/15/01 II-NNA-6754 AEC -- Nuclear Power Plant Docket Records (pdf) 01/15/01 NC-174-231 AEC -- Power Reactor Records (pdf) 01/15/01 II-NNA-2110 Alaska Power Administration (pdf) 02/09/01 N1-447-97-1 Appointee Clearance and Vetting Files (pdf) 09/10/02 N1-434-96-3 Bettis Atomic Laboratory Naval Reactors (pdf) 09/09/91 N1-434-91-8 Bonneville Power Administration (pdf) 08/06/07 N1-305-07-1 Cyclotron Records, Lawrence Berkeley National Laboratory (pdf) 12/22/88 N1-434-89-7 Energy Information Administration (EIARS) (pdf) 10/21/03 N1-434-96-2

324

Weekly Natural Gas Storage Report Schedule  

Weekly Natural Gas Storage Report (EIA)

Weekly Natural Gas Storage Report Schedule Weekly Natural Gas Storage Report Schedule Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Thursdays with the following exceptions. All times are Eastern. Alternate Release Date Release Day Release Time Holiday 11/27/2013 Wednesday 12:00 p.m. 11/28/2013 (Thursday) is Thanksgiving Day 12/27/2013 Friday 10:30 a.m. 12/25/2013 (Wednesday) is Christmas Day 1/3/2014 Friday 10:30 a.m. 1/1/2014 (Wednesday) is New Year's Day 11/14/2014 Friday 10:30 a.m. 11/11/2014 (Tuesday) is Veterns Day 11/26/2014 Wednesday 12:00 p.m. 11/27/2014 (Thursday) is Thanksgiving Day 12/24/2014 Wednesday 12:00 p.m. 12/25/2014 (Thursday) is Christmas Day 12/31/2014 Wednesday 12:00 p.m. 1/1/2015 (Thursday) is New Year's Day

325

Energy Efficient Scheduling via Partial Shutdown  

E-Print Network (OSTI)

Motivated by issues of saving energy in data centers we define a collection of new problems referred to as "machine activation" problems. The central framework we introduce considers a collection of $m$ machines (unrelated or related) with each machine $i$ having an {\\em activation cost} of $a_i$. There is also a collection of $n$ jobs that need to be performed, and $p_{i,j}$ is the processing time of job $j$ on machine $i$. We assume that there is an activation cost budget of $A$ -- we would like to {\\em select} a subset $S$ of the machines to activate with total cost $a(S) \\le A$ and {\\em find} a schedule for the $n$ jobs on the machines in $S$ minimizing the makespan (or any other metric). For the general unrelated machine activation problem, our main results are that if there is a schedule with makespan $T$ and activation cost $A$ then we can obtain a schedule with makespan $\\makespanconstant T$ and activation cost $\\costconstant A$, for any $\\epsilon >0$. We also consider assignment costs for jobs as in ...

Kuller, Samir; Saha, Barna

2009-01-01T23:59:59.000Z

326

Dynamic Scheduling of Skippable Periodic Tasks with Energy Efficiency in Weakly Hard Real-Time System  

E-Print Network (OSTI)

Energy consumption is a critical design issue in real-time systems, especially in battery- operated systems. Maintaining high performance, while extending the battery life between charges is an interesting challenge for system designers. Dynamic Voltage Scaling (DVS) allows a processor to dynamically change speed and voltage at run time, thereby saving energy by spreading run cycles into idle time. Knowing when to use full power and when not, requires the cooperation of the operating system scheduler. Usually, higher processor voltage and frequency leads to higher system throughput while energy reduction can be obtained using lower voltage and frequency. Instead of lowering processor voltage and frequency as much as possible, energy efficient real-time scheduling adjusts voltage and frequency according to some optimization criteria, such as low energy consumption or high throughput, while it meets the timing constraints of the real-time tasks. As the quantity and functional complexity of battery powered porta...

Baskaran, Santhi

2010-01-01T23:59:59.000Z

327

Duke-1-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

328

Replacement-1 Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Replacement-1 Wholesale Power Rate Schedule Area: Replacement Energy System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer. Document Available for Download Replacement-1 Rate Schedule More Documents & Publications Replacement-3 Wholesale Power Rate Schedule

329

CC-1-I Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule Area: Carolina Power & Light Company, Western Division System: CU This rate schedule shall be available to public bodies and cooperatives served through the facilities of Carolina Power & Light Company, Western Division (hereinafter called the Customers). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CC-1-I Rate Schedule More Documents & Publications CM-1-H Wholesale Power Rate Schedule

330

Santee-3-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule Santee-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be scheduled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

331

Santee-1-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule Santee-1-E Wholesale Power Rate Schedule Area: Central, Bamberg, and Georgetown System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be wheeled and scheduled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

332

Pump-2 Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Wholesale Power Rate Schedule 2 Wholesale Power Rate Schedule Pump-2 Wholesale Power Rate Schedule Area: Carters & Russell Pumping-Self Schedulers System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives who provide their own scheduling arrangement and elect to allow Southeastern to use a portion of their allocation for pumping (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, Florida, South Carolina, or North Carolina to whom power is provided pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale energy generated from pumping operations at the Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and

333

Duke-4-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina served through the transmission facilities of Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

334

CC-1-I Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule CC-1-I Wholesale Power Rate Schedule Area: Carolina Power & Light Company, Western Division System: CU This rate schedule shall be available to public bodies and cooperatives served through the facilities of Carolina Power & Light Company, Western Division (hereinafter called the Customers). This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CC-1-I Rate Schedule More Documents & Publications CM-1-H Wholesale Power Rate Schedule

335

Operator strength reduction  

Science Conference Proceedings (OSTI)

Operator strength reduction is a technique that improves compiler-generated code by reformulating certain costly computations in terms of less expensive ones. A common case arises in array addressing expressions used in loops. The compiler can replace ... Keywords: loops, static single assignment form, strength reduction

Keith D. Cooper; L. Taylor Simpson; Christopher A. Vick

2001-09-01T23:59:59.000Z

336

Transparent partial order reduction  

Science Conference Proceedings (OSTI)

Partial Order Reduction (POR) techniques improve the basic model checking algorithm by reducing the numbers of states and transitions explored in verifying a property of the model. In the "ample set" POR framework for the verification of an LTLX ... Keywords: Invisibility, Model checking, Partial order reduction, Transparent, Verification

Stephen F. Siegel

2012-02-01T23:59:59.000Z

337

Mexico - Greenhouse Gas Emissions Baselines and Reduction Potentials from  

Open Energy Info (EERE)

Greenhouse Gas Emissions Baselines and Reduction Potentials from Greenhouse Gas Emissions Baselines and Reduction Potentials from Buildings Jump to: navigation, search Name Mexico - Greenhouse Gas Emissions Baselines and Reduction Potentials from Buildings Agency/Company /Organization United Nations Environment Programme Sector Energy Focus Area Buildings Topics Baseline projection, GHG inventory, Pathways analysis, Background analysis Resource Type Publications Website http://www.unep.org/sbci/pdfs/ Country Mexico Central America References Greenhouse Emissions Baselines and Reduction Potentials for Buildings[1] Mexico - Greenhouse Gas Emissions Baselines and Reduction Potentials from Buildings Screenshot "This report represents the first comprehensive description of the factors that determine the present and future impacts of residential and commercial

338

MaGate: An Interoperable, Decentralized and Modular High-Level Grid Scheduler  

Science Conference Proceedings (OSTI)

This work presents the design and architecture of a decentralized grid scheduler named MaGate, which is developed within the SmartGRID project and focuses on grid scheduler interoperation. The MaGate scheduler is modular structured, and emphasizes the ... Keywords: Grid Computing, MaGate Scheduler, Meta-Scheduling, Scheduling, SmartGRID

Ye Huang; Amos Brocco; Michele Courant; Beat Hirsbrunne; Pierre Kuonen

2010-07-01T23:59:59.000Z

339

Impact of potential large-scale irrigation on the West African Monsoon and its dependence on location of irrigated area  

Science Conference Proceedings (OSTI)

This study investigates the impact of potential large-scale irrigation on the West African Monsoon using the MIT Regional Climate Model (MRCM). A new irrigation module is implemented to assess the impact of location and scheduling of irrigation on ...

Eun-Soon Im; Marc P. Marcella; Elfatih A. B. Eltahir

340

Solar Decathlon 2005 Daily Event Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

DAILY EVENT SCHEDULE DAILY EVENT SCHEDULE Last updated on September 30, 2005 Note: This schedule is not part of the official Rules and Regulations and is subject to change at any time. Weds, Sept 28 12:00 AM 12:30 AM 1:00 AM 1:30 AM 2:00 AM 2:30 AM 3:00 AM 3:30 AM 4:00 AM 4:30 AM 5:00 AM 5:30 AM 6:00 AM 6:30 AM 7:00 AM 7:30 AM 8:00 AM 8:30 AM 9:00 AM 9:30 AM 10:00 AM 10:30 AM 11:00 AM 11:30 AM 12:00 PM 12:30 PM 1:00 PM 1:30 PM 2:00 PM 2:30 PM 3:00 PM 3:30 PM 4:00 PM 4:30 PM 5:00 PM 5:30 PM 6:00 PM 6:30 PM 7:00 PM 7:30 PM 8:00 PM 8:30 PM 9:00 PM 9:30 PM 10:00 PM 10:30 PM 11:00 PM 11:30 PM Registration Forrestal Bldg (DOE) Cafeteria National Mall Team/Organizer meeting and Safety Orientation Thurs, Sept 29 12:00 AM 12:30 AM 1:00 AM 1:30 AM 2:00 AM 2:30 AM 3:00 AM 3:30 AM 4:00 AM 4:30 AM 5:00 AM 5:30 AM 6:00 AM 6:30 AM 7:00

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

An Implementation of Swing Modulo Scheduling with Extensions for Superblocks  

E-Print Network (OSTI)

This thesis details the implementation of Swing Modulo Scheduling, a Software Pipelining tech-nique, that is both effective and efficient in terms of compile time and generated code. Software Pipelining aims to expose Instruction Level Parallelism in loops which tend to help scientific and graphical applications. Modulo Scheduling is a category of algorithms that attempt to overlap iterations of single basic block loops and schedule instructions based upon a priority (derived from a set of heuristics). The approach used by Swing Modulo Scheduling is designed to achieve a highly optimized schedule, keeping register pressure low, and does both in a reasonable amount of compile time. One drawback of Swing Modulo Scheduling, (and all Modulo Scheduling algorithms) is that they are missing opportunities for further Instruction Level Parallelism by only handling single basic block loops. This thesis details extensions to the Swing Modulo Scheduling algorithm to handle multiple basic block loops in the form of a superblock. A superblock is group of basic blocks that have a single entry and multiple exits. Extending Swing Modulo Scheduling to support these types of loops increases the number of loops Swing Modulo Scheduling can be applied to. In

Tanya M. Lattner

2005-01-01T23:59:59.000Z

342

APS Long Range Operations Schedule FY2010  

NLE Websites -- All DOE Office Websites (Extended Search)

10) 10) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2009-3 2010-1 2010-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

343

APS Long Range Operations Schedule FY2009  

NLE Websites -- All DOE Office Websites (Extended Search)

09) 09) Alternate Formats: iCal | Excel | PDF APS Long Range Operation Schedule (FY2009) 2008-3 2009-1 2009-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

344

Selective Non-Catalytic Reduction (SNCR) Technology Overview  

Science Conference Proceedings (OSTI)

This document provides a technology overview regarding the application and operation of selective non-catalytic reduction (SNCR) to coal-fired electric utility boilers for the incremental reduction of NOx emissions. The document provides a historical perspective of the SNCR technology development, background regarding the reaction chemistry, and process parameters that impact SNCR NOx reduction performance. In addition, a review of reagent choices along with storage and handling requirements is ...

2013-09-12T23:59:59.000Z

345

Excellence in radioactive waste volume reduction  

SciTech Connect

The Brunswick plant is a two-unit boiling water reactor located at the mouth of the Cape Fear River near Wilmington, North Carolina. The plant has a once-through cooling system with highly brackish water. The operations subunit is responsible for liquid radwaste processing. The radiation control subunit is responsible for dry active waste processing and the transportation of all radioactive wast off-site. For the Brunswick plant, the development of an effective radioactive waste volume reduction program was a process involving a tremendous amount of grass-roots worker participation. With radioactive waste responsibilities divided between two separate groups, this process took place on a somewhat different schedule for liquid process waste and dry active waste. However, this development process did not begin until dedicated personnel were assigned to manage radwaste independently of other plant duties.

Henderson, J.

1987-01-01T23:59:59.000Z

346

Aluminum Reduction Technology  

Science Conference Proceedings (OSTI)

Jul 15, 2013... and academia from all over the world meet each other and share information. ... Trend and market demand, Energy saving initiatives in Reduction Process, ... An improved finite element model for thermal balance analysis of...

347

Reduction-in-Force  

Energy.gov (U.S. Department of Energy (DOE))

Reduction in force (RIF) is a set of regulations and procedures that are used to determine whether an employee keeps his or her present position, or whether the employee has a right to another...

348

Human Error Reduction  

Science Conference Proceedings (OSTI)

Reducing human error is recognized in the power-generation industry as a key factor in reducing safety-related events as well as improving asset availability. Achieving a sustainable culture change that leads to human error reduction in plant operations and maintenance remains a significant challenge to the industry. This report presents a behavior-based approach to human performance improvement and error reduction. The report explains fundamental elements of culture change and describes proven practices...

2010-12-23T23:59:59.000Z

349

Project Title: VIscosity Reduction Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

350

Reducing Average and Peak Temperatures of VLSI CMOS Digital Circuits by Means of Heuristic Scheduling Algorithm  

E-Print Network (OSTI)

This paper presents a BPD (Balanced Power Dissipation) heuristic scheduling algorithm applied to VLSI CMOS digital circuits/systems in order to reduce the global computational demand and provide balanced power dissipation of computational units of the designed digital VLSI CMOS system during the task assignment stage. It results in reduction of the average and peak temperatures of VLSI CMOS digital circuits. The elaborated algorithm is based on balanced power dissipation of local computational (processing) units and does not deteriorate the throughput of the whole VLSI CMOS digital system.

Wladyslaw Szczesniak

2008-01-07T23:59:59.000Z

351

APS Long Range Schedule FY1998  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Beamline Operations Schedule 8 Beamline Operations Schedule JAN Monday Tuesday Wednesday Thursday Friday Saturday Sunday Week 1 5 6 7 8 9 10 11 0000 - 0800 SM SM SM MS MS MS MS 0800 - 1600 SM SM* MS MS MS MS MS 1600 - 2400 SM SM MS MS MS MS MS Week 2 12 13 14 15 16 17 18 0000 - 0800 MS MS UO UO UO UO UO 0800 - 1600 MS* UO UO UO UO UO UO 1600 - 2400 MS UO UO UO UO UO UO Week 3 19 20 21 22 23 24 25 0000 - 0800 UO MS UO UO UO UO UO 0800 - 1600 MS UO UO UO UO UO UO 1600 - 2400 MS UO UO UO UO UO UO JAN/FEB 26 27 28 29 30 31 1 0000 - 0800 UO MS UO UO UO UO UO 0800 - 1600 MS SOM UO UO UO UO UO 1600 - 2400 MS UO UO UO UO UO UO Week 5 2 3 4 5 6 7 8 0000 - 0800 UO MS UO UO UO UO UO

352

APS Long Range Schedule FY1999  

NLE Websites -- All DOE Office Websites (Extended Search)

9 Beamline Operations Schedule 9 Beamline Operations Schedule JAN Monday Tuesday Wednesday Thursday Friday Saturday Sunday Week 1 18 19 20 21 22 23 24 0000 - 0800 MS MS MS MS UO UO UO 0800 - 1600 MS MS MS UO UO UO UO 1600 - 2400 MS MS MS UO UO UO UO Week 2 25 26 27 28 29 30 31 0000 - 0800 UO UO UO UO UO UO UO 0800 - 1600 UO MS UO UO UO UO UO 1600 - 2400 UO UO UO UO UO UO UO FEB 1 2 3 4 5 6 7 0000 - 0800 UO MS MS UO UO UO UO 0800 - 1600 MS MS UO UO UO UO UO 1600 - 2400 MS MS UO UO UO UO UO Week 4 8 9 10 11 12 13 14 0000 - 0800 UO UO UO UO UO UO UO 0800 - 1600 UO MS UO UO* UO UO UO 1600 - 2400 UO UO UO UO UO UO UO Week 5 15 16 17 18 19 20 21 0000 - 0800 UO MS MS UO UO U O UO

353

APS Long Range Schedule FY1996  

NLE Websites -- All DOE Office Websites (Extended Search)

Long Range Commissioning Schedule for FY1996 Long Range Commissioning Schedule for FY1996 Date First Shift 0:00-8:00 Second Shift 8:00-16:00 Third Shift 16:00-24:00 3/15/96 SR Studies 1-ID-A Shielding Verification SR Studies 3/23/96 SR Studies 3-ID-A , 2-ID-A , 3-ID-B Shielding Verifications User Beam 3/24/96 User Beam User Beam User Beam 3/25/96 User Beam 19-ID-A Shielding Verification User Beam 3/26/96 User Beam 2-ID-A , 12-BM-A Shielding Verifications User Beam 3/27/96 User Beam 5-BM-A Shielding Verification User Beam 3/28/96 User Beam 19-ID-C Shielding Verification User Beam until 20:00 3/29/96 SR Studies SR Studies SR Studies 3/30/96 SR Studies SR Studies SR Studies 3/31/96 SR Studies SR Studies SR Studies 4/1/96 SR Studies SR Studies SR Studies 4/2/96 SR Studies 5-BM-B Shielding Verification User Beam

354

Weekly Natural Gas Storage Report Schedule  

U.S. Energy Information Administration (EIA) Indexed Site

‹ Weekly Natural Gas Storage Report ‹ Weekly Natural Gas Storage Report Weekly Natural Gas Storage Report Schedule Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Thursdays with the following exceptions. All times are Eastern. Alternate Release Date Release Day Release Time Holiday 7/6/2012 Friday 10:30 a.m. 7/4/2012 (Wednesday) is Independence Day 11/21/2012 Wednesday 12:00 p.m. 11/22/2012 (Thursday) is Thanksgiving Day 12/28/2012 Friday 10:30 a.m. 12/25/2012 (Tuesday) is Christmas Day 1/4/2013 Friday 10:30 a.m. 1/1/2013 (Tuesday) is New Year's Day 7/3/2013 Wednesday 12:00 p.m. 7/4/2013 (Thursday) is Independence Day 10/22/2013 Tuesday 10:30 a.m. EIA Closed 11/27/2013 Wednesday 12:00 p.m. 11/28/2013 (Thursday) is Thanksgiving Day

355

APS Long Range Schedule FY1997  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Beamline Operations Schedule 7 Beamline Operations Schedule January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 6 7 8 9 10 11 12 00:00-08:00 MS MS UO UO UO UO UO 08:00-16:00 MS UO UO UO SV UO UO 16:00-24:00 MS UO UO UO UO UO UO 13 14 15 16 17 18 19 00:00-08:00 UO UO UO UO UO MS MS 08:00-16:00 UO SV SV Contingency UO MS MS MS 16:00-24:00 UO UO UO UO MS MS MS 20 21 22 23 24 25 26 00:00-08:00 MS UO UO UO UO UO MS 08:00-16:00 UO UO SV Contingency UO UO MS MS 16:00-24:00 UO UO UO UO UO MS MS 27 28 29 30 31 1 2 00:00-08:00 MS SM SM SM SM SM SM 08:00-16:00 MS SM SM SM SM SM SM 16:00-24:00 MS SM SM SM SM SM SM FEB Monday Tuesday Wednesday Thursday Friday Saturday Sunday

356

SOCO-1-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule Area: AMEA, Unaffil AL Munis and Coops, Hampton, East Miss., SMEPA off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted and scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F.

357

NC-1-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NC-1-B Wholesale Power Rate Schedule NC-1-B Wholesale Power Rate Schedule NC-1-B Wholesale Power Rate Schedule Area: Virginia Power/CP&L System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to a contract between the Government and Virginia Electric and Power Company (hereinafter called the Virginia Power) and PJM Interconnection LLC (hereinafter called PJM), scheduled pursuant to a contract between the Government and Carolina Power & Light Company (hereinafter called CP&L), and billed pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale of power

358

VA-4-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-B Wholesale Power Rate Schedule 4-B Wholesale Power Rate Schedule VA-4-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina served through the transmission facilities of Virginia Electric and Power Company (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download VA-4-B Rate Schedule More Documents & Publications

359

SOCO-3-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule SOCO-3-E Wholesale Power Rate Schedule Area: MEAG, Dalton System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects (hereinafter referred to collectively as the Projects) and sold under appropriate contracts between

360

AP-4-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-B Wholesale Power Rate Schedule 4-B Wholesale Power Rate Schedule AP-4-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia served through the facilities of American Electric Power Service Corporation (hereinafter called the Company) and PJM Interconnection LLC (hereinafter called PJM). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download AP-4-B Rate Schedule More Documents & Publications

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Replacement-2-A Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-A Wholesale Power Rate Schedule 2-A Wholesale Power Rate Schedule Replacement-2-A Wholesale Power Rate Schedule Area: Replacement Energy System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and Virginia to whom power is provided pursuant to contracts between the Government and the customer from the John H. Kerr and Philpott Projects (or Kerr-Philpott System). This rate schedule shall be applicable to the sale of wholesale energy purchased to meet contract minimum energy and sold under appropriate contracts between the Government and the Customer. Document Available for Download Replacement-2-A Rate Schedule More Documents & Publications Southeastern Power Administration 2010 Annual Report

362

AP-3-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-B Wholesale Power Rate Schedule 3-B Wholesale Power Rate Schedule AP-3-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects (hereinafter called the Projects) and sold under appropriate contracts between the Government and the Customer. Document Available for Download

363

Santee-4-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule Santee-4-E Wholesale Power Rate Schedule Area: Santee-Cooper System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina served through the transmission facilities of South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does not apply to energy from pumping operations at the Carters and Richard B.

364

Descriptions of Task Order Schedules and Placement of Pricing Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RFP DE-RP36-06GO96031 RFP DE-RP36-06GO96031 10/11/2007 ATTACHMENT J-5 DESCRIPTIONS OF TASK ORDER SCHEDULES AND PLACEMENT OF PRICING INFORMATION J-5.1 DESCRIPTIONS OF TASK ORDER (TO) SCHEDULES (SCHEDULE TEMPLATES ARE PROVIDED IN ATTACHMENT J-6) J-5.1.1 Schedule TO-1 (Preliminary Assessment - PA) - Proposed Guaranteed Cost Savings and Contractor Payments - Schedule TO-1 (PA) shall be submitted to present the contractor's estimated cost savings, proposed guaranteed cost savings, and contractor payments. TO-1 (PA) values submitted may be in estimated ranges. Based on the preliminary survey and agency discussions, the contractor shall submit a completed Schedule TO-1 (PA) containing: A. Column (a) - Contractor submits proposed estimated cost savings during the implementation period, prior to full project acceptance (see most recent version

365

Duke-3-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be scheduled pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer.

366

Duke-2-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. The Customer is responsible for providing a scheduling arrangement with the Government. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate

367

Santee-2-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule Santee-2-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be wheeled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

368

SOCO-1-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SOCO-1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule Area: AMEA, Unaffil AL Munis and Coops, Hampton, East Miss., SMEPA off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted and scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F.

369

AP-1-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-B Wholesale Power Rate Schedule 1-B Wholesale Power Rate Schedule AP-1-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted and scheduled pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer.

370

CTVI-1-A Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CTVI-1-A Wholesale Power Rate Schedule CTVI-1-A Wholesale Power Rate Schedule CTVI-1-A Wholesale Power Rate Schedule Area: Former customers of TVA System: Cumberland This rate schedule shall be available to customers (hereinafter called the Customer) who are or were formerly in the Tennessee Valley Authority (hereinafter called TVA) service area. This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and the Customer. Document Available for Download CTVI-1-A Rate Schedule More Documents & Publications

371

Descriptions of Task Order Schedules and Placement of Pricing Information  

NLE Websites -- All DOE Office Websites (Extended Search)

RFP DE-RP36-06GO96031 RFP DE-RP36-06GO96031 10/11/2007 ATTACHMENT J-5 DESCRIPTIONS OF TASK ORDER SCHEDULES AND PLACEMENT OF PRICING INFORMATION J-5.1 DESCRIPTIONS OF TASK ORDER (TO) SCHEDULES (SCHEDULE TEMPLATES ARE PROVIDED IN ATTACHMENT J-6) J-5.1.1 Schedule TO-1 (Preliminary Assessment - PA) - Proposed Guaranteed Cost Savings and Contractor Payments - Schedule TO-1 (PA) shall be submitted to present the contractor's estimated cost savings, proposed guaranteed cost savings, and contractor payments. TO-1 (PA) values submitted may be in estimated ranges. Based on the preliminary survey and agency discussions, the contractor shall submit a completed Schedule TO-1 (PA) containing: A. Column (a) - Contractor submits proposed estimated cost savings during the implementation period, prior to full project acceptance (see most recent version

372

MISS-1-N Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MISS-1-N Wholesale Power Rate Schedule MISS-1-N Wholesale Power Rate Schedule MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association System: Georgia-Alabama-South Carolina This rate schedule shall be available to the South Mississippi Electric Power Association (hereinafter called the Customer) to whom power may be wheeled pursuant to contracts between the Government and PowerSouth Energy Cooperative (hereinafter called PowerSouth). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

373

Water pollution Control Permit Fee Schedules (West Virginia) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

pollution Control Permit Fee Schedules (West Virginia) pollution Control Permit Fee Schedules (West Virginia) Water pollution Control Permit Fee Schedules (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Fees Siting and Permitting Provider Department of Environmental Protection This rule establishes schedules of permit application fees and annual permit fees for state water pollution control permits and national

374

RECORDS DISPOSITION SCHEDULE: Year 2000 Project Records | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Year 2000 Project Records RECORDS DISPOSITION SCHEDULE: Year 2000 Project Records Year 2000 (Y2K) Project records have been created to document the effort of the Department...

375

Exponential neighborhood search for a parallel machine scheduling ...  

E-Print Network (OSTI)

production is early and additional costs resulting from a tardy delivery. The scheduling problem we study in this article stems from this just-in-time philosophy .

376

Optimization Online - Scheduling Workover Rigs for Onshore Oil ...  

E-Print Network (OSTI)

Oct 12, 2003 ... Scheduling Workover Rigs for Onshore Oil Production. Dario Aloise (dario ***at** * dimap.ufrn.br) Daniel Aloise (aloise ***at*** inf.puc-rio.br)

377

Flow shop scheduling with peak power consumption constraints  

E-Print Network (OSTI)

Mar 29, 2012 ... In particular, we consider a flow shop scheduling problem with a restriction on peak power consumption, in addition to the traditional...

378

A combinatorial auctions perspective on min-sum scheduling ...  

E-Print Network (OSTI)

Proof This is a consequence of the equivalence relations, whose proof is the essentially the same ..... paper, but believe of interest to the scheduling community.

379

Parallel machine scheduling with nested job assignment restrictions  

Science Conference Proceedings (OSTI)

We derive a polynomial time approximation scheme for a special case of makespan minimization on unrelated machines. Keywords: Approximation algorithms, Restricted assignment, Scheduling

Gabriella Muratore; Ulrich M. Schwarz; Gerhard J. Woeginger

2010-01-01T23:59:59.000Z

380

VA-3-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule...

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

VA-1-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule...

382

Simulation Optimization for the Stochastic Economic Lot Scheduling ...  

E-Print Network (OSTI)

Lot-sizing and scheduling are classical problems of production planning, with particularly ...... i ,?} for all policies, with ? ? 1 to ensure exploration in case x.

383

title Microgrid Reliability Modeling and Battery Scheduling Using...  

NLE Websites -- All DOE Office Websites (Extended Search)

article title Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming journal Journal of Electric Power Systems Research volume year month pages...

384

igure 4. Production Schedules at Two Development Rates for the ...  

U.S. Energy Information Administration (EIA)

Figure 4. Production Schedules at Two Development Rates for the Statistical Mean of Recovering 10.3 Billion Barrels of Technically Recoverable Oil from the ANWR ...

385

ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 2: PAYROLL AND PAY ADMINISTRATION RECORDS-Revision 2 Financial Management Handbook Handbook on Overseas Assignments...

386

New optimization techniques for power system generation scheduling.  

E-Print Network (OSTI)

??Generation scheduling in restructured electric power systems is critical to maintain the stability and security of a power system and economical operation of the electricity (more)

Sun, Wei

2011-01-01T23:59:59.000Z

387

ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT...  

NLE Websites -- All DOE Office Websites (Extended Search)

3: PROCUREMENT, SUPPLY, AND GRANT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS The basic procurement files reflect a considerable range of...

388

_PART I - THE SCHEDULE SECTION B-H  

National Nuclear Security Administration (NNSA)

for the KCP: meeting product schedule; meeting product specification; cost management; asset management; and compliance to contract standards including ES&H and National Security....

389

Multifit-based scheduling of uniform nonsimultaneous parallel ...  

E-Print Network (OSTI)

it usually orders them in nondecreasing order of their duration and then applies the first .... loop from our algorithm does not produce a feasible schedule. We de-.

390

Optimization Online - Optimal Job Scheduling with Day-ahead Price ...  

E-Print Network (OSTI)

Aug 17, 2011 ... Optimization Online. Optimal Job Scheduling with Day-ahead Price and Random Local Distributed Generation: A Two-stage Robust Approach.

391

Scheduling Tertiary I/O in Database Applications  

E-Print Network (OSTI)

We study the problem of scheduling I/O requests for tertiary storage libraries to improve performance. The focus is on scheduling policies that process all requests on a loaded medium before unloading it. For single drive settings an efficient algorithm that produces optimal schedules is developed. For multiple drives the problem is shown to be NP-Complete. Efficient and effective heuristics are presented for the multiple drives case. The scheduling policies developed achieve significant performance gains over more naive first come first server policies. The study is general enough to be applicable to any storage library handling removable media, such as tapes or optical disks.

Sunil Prabhakar; Divyakant Agrawal; Amr El Abbadi; Ambuj Singh

1997-01-01T23:59:59.000Z

392

Analysis of Traffic Scheduling Technique for Smart Grid Mesh ...  

Science Conference Proceedings (OSTI)

Analysis of Traffic Scheduling Technique for Smart Grid Mesh Networks ... In this paper, we present a multi-gate mesh network architecture that has ...

2012-01-03T23:59:59.000Z

393

2007 Solar Decathlon Detailed Event Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

DETAILED EVENT SCHEDULE DETAILED EVENT SCHEDULE Last updated on September 14, 2007 Note: This schedule is subject to change at any time. 12:00 AM 12:30 AM 1:00 AM 1:30 AM 2:00 AM 2:30 AM 3:00 AM 3:30 AM 4:00 AM 4:30 AM 5:00 AM 5:30 AM 6:00 AM 6:30 AM 7:00 AM 7:30 AM 8:00 AM 8:30 AM 9:00 AM 9:30 AM 10:00 AM 10:30 AM 11:00 AM 11:30 AM 12:00 PM 12:30 PM 1:00 PM 1:30 PM 2:00 PM 2:30 PM 3:00 PM 3:30 PM 4:00 PM 4:30 PM 5:00 PM 5:30 PM 6:00 PM 6:30 PM 7:00 PM 7:30 PM 8:00 PM 8:30 PM 9:00 PM 9:30 PM 10:00 PM 10:30 PM 11:00 PM 11:30 PM 12:00 AM 12:30 AM 1:00 AM 1:30 AM 2:00 AM 2:30 AM 3:00 AM 3:30 AM 4:00 AM 4:30 AM 5:00 AM 5:30 AM 6:00 AM 6:30 AM 7:00 AM 7:30 AM 8:00 AM 8:30 AM 9:00 AM 9:30 AM 10:00 AM 10:30 AM 11:00 AM 11:30 AM 12:00 PM 12:30 PM 1:00 PM 1:30 PM 2:00 PM 2:30 PM 3:00 PM 3:30 PM 4:00 PM 4:30 PM 5:00 PM 5:30 PM 6:00 PM 6:30 PM 7:00 PM 7:30 PM 8:00

394

Expanding Your Horizons scheduled for March 2  

NLE Websites -- All DOE Office Websites (Extended Search)

Expanding Your Horizons Expanding Your Horizons Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit Expanding Your Horizons scheduled for March 2 The conference offers fifth- to 12th-grade girls opportunities to participate in hands-on workshops about science, technology, engineering, math and related fields. February 1, 2013 dummy image Read our archives. Contacts Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email Up to 250 young women are expected to participate in the workshops that will include subjects such as computers and robots, veterinary medicine, cryptography and ocean science. This year the Santa Fe and Los Alamos Expanding Your Horizons (EYH) conferences are combined into one, all-day session to be held on March 2 at

395

Evaluate Greenhouse Gas Reduction Strategies Using Renewable Energy in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Evaluate Greenhouse Gas Reduction Strategies Using Renewable Energy Evaluate Greenhouse Gas Reduction Strategies Using Renewable Energy in Buildings Evaluate Greenhouse Gas Reduction Strategies Using Renewable Energy in Buildings October 7, 2013 - 11:23am Addthis Once Federal sites have been screened for viability of different renewable energy resources to evaluate emissions profile, the next step is to establish what renewable energy resources developed at which particular sites would have the greatest impact on the agency's overall greenhouse gas (GHG) emissions goals. It is important to consider that some types of renewable energy generation could impact not only Scope 1 and 2 GHG goals, but also Scope 3 goals through avoided transmission and distribution losses. Estimate Greenhouse Gas Reduction Potential It is important to note that solar systems can have the greatest reduction

396

A Comparison of Mass Rate and Steam Quality Reductions to Optimize Steamflood Performance  

SciTech Connect

Many operators of steamdrive projects will reduce the heat injection rate as the project matures. The major benefit of this practice is to reduce the fuel costs and thus extend the economic life of the project. However, there is little industry consensus on whether the heat cuts should take the form of: (1) mass rate reductions while maintaining the same high steam quality, or (2) steam quality decreases while keeping the same mass rate. Through the use of a commercial three-phase, three-dimensional simulator, the oil recovery schedules obtained when reducing the injected steam mass rate or quality with time were compared under a variety of reservoir and operating conditions. The simulator input was validated for Kern River Field conditions by using the guidelines developed by Johnson, et at. (1989) for four steamflood projects in Kern River. The results indicate that for equivalent heat injection rates, decreasing the steam injection mass rate at a constant high quality will yield more economic oil than reducing the steam quality at a constant mass rate. This conclusion is confirmed by a sensitivity analysis which demonstrates the importance of the gravity drainage/steam zone expansion mechanism in a low-pressure, heavy oil steamflood with gravity segregation. Furthermore, the impact of discontinuous silts and nonuniform initial temperatures within the steamflood zone was studied, indicating again that a decreasing mass rate injection strategy is a superior operating practice.

Messner, Gregory L.

1999-08-09T23:59:59.000Z

397

Global Threat Reduction Initiative  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

comprehensive comprehensive strategy to prevent nuclear terrorism; and  The key organization responsible for implementing the U.S. HEU minimization policy. GTRI MISSION Reduce and protect vulnerable nuclear and radiological material located at civilian sites worldwide. DOE STRATEGIC GOAL 2.2 Prevent the acquisition of nuclear and radiological materials for use in weapons of mass destruction and other acts of terrorism Protect high priority nuclear and radiological materials from theft and sabotage These efforts result in threat reduction by improving security on the bomb material remaining at civilian sites - each vulnerable building that is protected reduces the risk until a permanent threat reduction solution can be implemented.

398

REDUCTIONS WITHOUT REGRET: SUMMARY  

SciTech Connect

This paper briefly summarizes the series in which we consider the possibilities for losing, or compromising, key capabilities of the U.S. nuclear force in the face of modernization and reductions. The first of the three papers takes an historical perspective, considering capabilities that were eliminated in past force reductions. The second paper is our attempt to define the needed capabilities looking forward in the context of the current framework for force modernization and the current picture of the evolving challenges of deterrence and assurance. The third paper then provides an example for each of our undesirable outcomes: the creation of roach motels, box canyons, and wrong turns.

Swegle, J.; Tincher, D.

2013-09-16T23:59:59.000Z

399

Rate Schedule CV-T3 (Supersedes Schedules CV- T2) UNITED STATES DEPARTMENT OF ENERGY  

NLE Websites -- All DOE Office Websites (Extended Search)

T3 T3 (Supersedes Schedules CV- T2) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR POINT-TO-POINT TRANSMISSION SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Central Valley Project (CVP) firm and/or non-firm Point-to-Point (PTP) transmission service. Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points of

400

An Effective Optimization-Based Algorithm for Job Shop Scheduling with Fixed-Size Transfer Lots  

E-Print Network (OSTI)

Effective scheduling of production lots is of great importance for manufacturing medium to high-volume products that require significant setup times. Compared to traditional entire-lot production, lot splitting techniques divide a production lot into multiple smaller sublots so that each sublot can be "transferred" from one stage of operation to the next as soon as it has been completed. "Transfer lots," therefore, significantly reduce lead times and lower work-in-process (WIP) inventory. The mathematical modeling, analysis, and control of transfer lots, however, is extremely difficult. This paper presents a novel integer programming formulation with separable structure for scheduling job shops with fixed-size transfer lots. A solution methodology based on a synergistic combination of Lagrangian relaxation, backward dynamic programming (BDP), and heuristics is developed. Through explicit modeling of lot dynamics, transfer lots are handled on standard machines, machines with setups, and machines requiring all transfer lots within a production lot to be processed simultaneously. With "substates" and the derivation of DP functional equations considering transfer lot dynamics, the standard BDP is extended to solve the lot-level subproblems. The recently developed "time step reduction technique" is also used for increased efficiency. It implicitly establishes two time scales to reduce computational requirements without much loss of modeling accuracy and scheduling performance, thus enabling resolution of long-horizon problems within controllable computational requirements. The method has been implemented using object-oriented programming language C++, and numerical tests show that high-quality schedules involving transfer lots are efficiently generated to achieve on-time delivery of products with low WIP inventory.

Bin Jin; Peter B. Luh; L.S. Thakur

1999-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Optimal scheduling for constant-rate multi-mode systems  

Science Conference Proceedings (OSTI)

Constant-rate multi-mode systems are hybrid systems that can switch freely among a finite set of modes, and whose dynamics is specified by a finite number of real-valued variables with mode-dependent constant rates. The schedulability problem for such ... Keywords: cyber-physical systems, green scheduling, hybrid automata, peak minimization, switched systems

Rajeev Alur; Ashutosh Trivedi; Dominik Wojtczak

2012-04-01T23:59:59.000Z

402

Particle swarm optimization technique based short-term hydrothermal scheduling  

Science Conference Proceedings (OSTI)

Particle swarm optimization is applied to determine the optimal hourly schedule of power generation in a hydrothermal power system. A multi-reservoir cascaded hydroelectric system with a nonlinear relationship between water discharge rate, net head and ... Keywords: Cascaded reservoirs, Hydrothermal scheduling, Particle swarm optimization

K. K. Mandal; M. Basu; N. Chakraborty

2008-09-01T23:59:59.000Z

403

Hybrid search algorithm to optimize scheduling problems for TCPN models  

Science Conference Proceedings (OSTI)

Scheduling of manufacturing or logistic processes takes high importance as a key factor to improve competitiveness in industrial systems. The state space analysis of Timed Coloured Petri Nets is an accepted simulation-optimization approach which suffers ... Keywords: decision support systems, discrete event systems, scheduling, state space, timed coloured Petri nets

Miguel Mujica; Miquel Angel Piera

2010-07-01T23:59:59.000Z

404

Iterative improvement to solve the parcel hub scheduling problem  

Science Conference Proceedings (OSTI)

This paper presents iterative improvement algorithms to solve the parcel hub scheduling problem (PHSP). The PHSP is combinatorial optimization problem that consists of scheduling a set of inbound trailers to a small number of unload docks. At the unload ... Keywords: Cross docks, Genetic algorithms, Local search, Parcel delivery industry, Simulated annealing

Douglas L. McWilliams

2010-08-01T23:59:59.000Z

405

Editorial: AI planning and scheduling in the medical hospital environment  

Science Conference Proceedings (OSTI)

Hospital management is a hard task due to the complexity of the organization, the costly infrastructure, the specialized services offered to different patients and the need for prompt reaction to emergencies. Artificial Intelligence planning and scheduling ... Keywords: Artificial Intelligence, Hospital management, Medical therapy, Planning, Scheduling

Constantine D Spyropoulos

2000-10-01T23:59:59.000Z

406

Feedback fuzzy-DVS scheduling of control tasks  

Science Conference Proceedings (OSTI)

To consider the energy-aware scheduling problem in computer-controlled systems is necessary to improve the control performance, to use the limited computing resource sufficiently, and to reduce the energy consumption to extend the lifetime of the whole ... Keywords: Control task, Dynamic voltage scaling, Feedback control, Fuzzy rule, Scheduling

Hong Jin; Danli Wang; Hongan Wang; Hui Wang

2007-08-01T23:59:59.000Z

407

Efficient scheduling of soft real-time applications on multiprocessors  

Science Conference Proceedings (OSTI)

In soft real-time applications, tasks are allowed to miss their deadlines. Thus, less-costly scheduling algorithms can be used at the price of occasional violations of timing constraints. This may be acceptable if reasonable tardiness bounds (i.e., bounds ... Keywords: Fairness, multiprocessors, quality-of-service, real-time scheduling, soft real-time applications, tardiness

Anand Srinivasan; James H. Anderson

2005-04-01T23:59:59.000Z

408

Hybrid solution algorithms for task scheduling problem with moving executors  

Science Conference Proceedings (OSTI)

Heuristic algorithms for solving the task scheduling problem with moving executors to minimize the sum of completion times are considered. The corresponding combinatorial optimization problem is formulated. Three hybrid solution algorithms are introduced. ... Keywords: Artificial intelligence, Flexible manufacturing systems, Scheduling algorithms

Jerzy Jzefczyk

2006-03-01T23:59:59.000Z

409

Queuing model based on scheduling strategies affect local network services  

Science Conference Proceedings (OSTI)

This paper is a comprehensive study of some queuing scheduling strategies that operates on a local network. The study addresses the most convenient strategies used in operating systems. It indicates a new queue model based on some scheduling strategies ... Keywords: first come first serve, last come first serve, network services, queue jobs, queue strategy, strategies performance

Zakaria Suliman Zubi; Ismaeel H. Al-Dubar

2009-04-01T23:59:59.000Z

410

Distributed Scheduling Agents for Disaster Response Laura Barbulescu1  

E-Print Network (OSTI)

Distributed Scheduling Agents for Disaster Response Laura Barbulescu1 , Zachary B. Rubinstein1 response coordination problem. The target problem is a field exer- cise mockup of a natural disaster, where In this paper, we describe the application of a multi-agent framework for collaborative scheduling to a disaster

Wilkins, David E.

411

A 0-1 goal programming model for nurse scheduling  

Science Conference Proceedings (OSTI)

In this study, a computerized nurse-scheduling model is developed. The model is approached through a 0-1 linear goal program. It is adapted to Riyadh Al-Kharj hospital Program (in Saudi Arabia) to improve the current manual-made schedules. The developed ...

M. N. Azaiez; S. S. Al Sharif

2005-03-01T23:59:59.000Z

412

Injection/withdrawal scheduling for natural gas storage facilities  

Science Conference Proceedings (OSTI)

Control decisions for gas storage facilities are made in the face of extreme uncertainty over future natural gas prices on world markets. We examine the problem faced by owners of storage contracts of how to manage the injection/withdrawal schedule of ... Keywords: natural gas storage, optimization, scheduling

Alan Holland

2007-03-01T23:59:59.000Z

413

Steal Tree: low-overhead tracing of work stealing schedulers  

Science Conference Proceedings (OSTI)

Work stealing is a popular approach to scheduling task-parallel programs. The flexibility inherent in work stealing when dealing with load imbalance results in seemingly irregular computation structures, complicating the study of its runtime behavior. ... Keywords: async-finish parallelism, tracing, work-stealing schedulers

Jonathan Lifflander; Sriram Krishnamoorthy; Laxmikant V. Kale

2013-06-01T23:59:59.000Z

414

Task scheduling algorithm using minimized duplications in homogeneous systems  

Science Conference Proceedings (OSTI)

For fine grain task graphs, duplication-based scheduling algorithms are generally more efficient than list and cluster-based algorithms. However, most duplication-based heuristics try to duplicate all possible ancestor nodes of a given join node, in ... Keywords: Distributed architectures, Load balancing and task assignment, Parallel processors, Scheduling and task partitioning

KwangSik Shin; MyongJin Cha; MunSuck Jang; JinHa Jung; WanOh Yoon; SangBang Choi

2008-08-01T23:59:59.000Z

415

TOWARDS REAL-TIME GENERATION SCHEDULING IN MICROGRIDS WITH  

E-Print Network (OSTI)

TOWARDS REAL-TIME GENERATION SCHEDULING IN MICROGRIDS WITH PERFORMANCE GUARANTEE LIAN LU, JINLONG TU, CHI-KIN CHAU, MINGHUA CHEN, ZHAO XU AND XIAOJUN LIN INTRODUCTION Microgrid is an emerging- generation improves generation efficiency by 2-3x. A key problem in microgrid operations is how to schedule

Zhang, Junshan

416

Renewable Energy Scheduling for Fading Channels with Maximum Power Constraint  

E-Print Network (OSTI)

Renewable Energy Scheduling for Fading Channels with Maximum Power Constraint Zhe Wang Electrical The employment of the renewable energy source has grown from long-established concepts into devices for powering--In this paper, we develop efficient algorithm to obtain the optimal energy schedule for fading channel

Greenberg, Albert

417

Distributed scheduling schemes for wireless mesh networks: A survey  

Science Conference Proceedings (OSTI)

An efficient scheduling scheme is a crucial part of Wireless Mesh Networks (WMNs)an emerging communication infrastructure solution for autonomy, scalability, higher throughput, lower delay metrics, energy efficiency, and other service-level guarantees. ... Keywords: Wireless mesh networks, ad hoc networks, cyclic access, distributed scheduling schemes, pseudo-random access, random access

Kanthaiah Sivapragasam Vijayalayan, Aaron Harwood, Shanika Karunasekera

2013-10-01T23:59:59.000Z

418

Energy-efficient datapath scheduling using multiple voltages and dynamic clocking  

Science Conference Proceedings (OSTI)

Recently, dynamic frequency scaling has been explored at the CPU and system levels for power optimization. Low-power datapath scheduling using multiple supply voltages has been well researched. In this work, we develop new datapath scheduling algorithms ... Keywords: High-level synthesis, dynamic frequency clocking, low-power datapath synthesis, multiple voltage scheduling, resource-constrained scheduling, time-constrained scheduling

Saraju P. Mohanty; N. Ranganathan

2005-04-01T23:59:59.000Z

419

MaGate Simulator: A Simulation Environment for a Decentralized Grid Scheduler  

Science Conference Proceedings (OSTI)

This paper presents a simulator for of a decentralized modular grid scheduler named MaGate. MaGate's design emphasizes scheduler interoperability by providing intelligent scheduling serving the grid community as a whole. Each MaGate scheduler instance ... Keywords: Grid Scheduling, MaGate Simulator, Simulation, SmartGRID

Ye Huang; Amos Brocco; Michele Courant; Beat Hirsbrunner; Pierre Kuonen

2009-08-01T23:59:59.000Z

420

Stability and Performance of List Scheduling With ExternalProcess Delays  

Science Conference Proceedings (OSTI)

Non-preemptive static priority list scheduling is a simple, low-overhead approach to scheduling precedence-constrained tasks in real-time multiprocessor systems. However, it is vulnerable to anomalous timing behavior caused by variations in task durations. Specifically, ... Keywords: general instability conditions, multiprocessor anomalies, non-preemptive scheduling, phantom tasks, priority list scheduling, scheduling stability

J. S. Deogun; R. M. Kieckhafer; A. W. Krings

1998-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

DOE HQ Shuttle Bus Schedule and Route | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE HQ Shuttle Bus Schedule and Route DOE HQ Shuttle Bus Schedule and Route DOE HQ Shuttle Bus Schedule and Route The DOE Shuttle Buses follow the same schedules between the two main Headquarters locations, Forrestal and Germantown. The buses start their routes at each Headquarters facility at the same times, see the schedule below. The subsequent stops at the other facilities are relative to the departure time of each route. Headquarters employees are reminded of the statutory provisions that authorize and limit the use of the shuttle bus service. Specific authority for the use of appropriated funds to pay for transportation for official purposes is contained in section 1344(a)(1) of Title 31, U.S. Code. Use of this transportation for any other purpose is inappropriate and against the law.

422

AP-2-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-B Wholesale Power Rate Schedule 2-B Wholesale Power Rate Schedule AP-2-B Wholesale Power Rate Schedule Area: American Electric Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia to whom power may be transmitted pursuant to contracts between the Government, American Electric Power Service Corporation (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer. Document Available for Download

423

CM-1-H Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule October 1, 2011 - 3:22pm Addthis Availability: This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency (hereinafter called the Customers). Applicability: This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Character of Service: The electric capacity and energy supplied hereunder will be three phase

424

Department Sets Aggressive Schedule for New Appliance Standards |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sets Aggressive Schedule for New Appliance Standards Sets Aggressive Schedule for New Appliance Standards Department Sets Aggressive Schedule for New Appliance Standards February 1, 2006 - 8:52am Addthis WASHINGTON, DC - The Department of Energy (DOE) today released a schedule for setting new appliance efficiency standards. The five-year plan outlines how DOE will work with all of its partners to address the appliance standards rulemaking backlog and meet all of the statutory requirements established in the Energy Policy and Conservation Act and the Energy Policy Act of 2005 (EPACT 2005). "Improved efficiency saves Americans money and energy," said Acting Assistant Secretary for Energy Efficiency and Renewable Energy, Douglas L. Faulkner. "This aggressive schedule shows our commitment to greater

425

Department Sets Aggressive Schedule for New Appliance Standards |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department Sets Aggressive Schedule for New Appliance Standards Department Sets Aggressive Schedule for New Appliance Standards Department Sets Aggressive Schedule for New Appliance Standards February 1, 2006 - 8:52am Addthis WASHINGTON, DC - The Department of Energy (DOE) today released a schedule for setting new appliance efficiency standards. The five-year plan outlines how DOE will work with all of its partners to address the appliance standards rulemaking backlog and meet all of the statutory requirements established in the Energy Policy and Conservation Act and the Energy Policy Act of 2005 (EPACT 2005). "Improved efficiency saves Americans money and energy," said Acting Assistant Secretary for Energy Efficiency and Renewable Energy, Douglas L. Faulkner. "This aggressive schedule shows our commitment to greater

426

DEPARTMENT OF ENERGY RESEARCH AND DEVELOPMENT RECORDS SCHEDULE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13 13 DEPARTMENT OF ENERGY RESEARCH AND DEVELOPMENT RECORDS SCHEDULE N1-434-96-9, N1-434-07-01, and N1-434-08-02 Revision 2 June 2008 Scope. This schedule encompasses research and development (R&D) records generated within the Department of Energy (DOE) complex, which consists of all DOE offices and its contractor organizations, such as the National Laboratories. It applies to all applicable records regardless of media or format, including paper, audio and visual, and electronic records. Excluded from this schedule are R&D records pertaining to (a) nuclear weapons, which are covered by DOE Nuclear Weapons Schedule (NI-434-96-5 and N1-434-98- 27), and (b) Work for Others, Cooperative Research and Development Agreements (CRADA), and cost sharing agreements, which are covered by DOE Schedule N1-434-

427

VA-2-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-B Wholesale Power Rate Schedule 2-B Wholesale Power Rate Schedule VA-2-B Wholesale Power Rate Schedule Area: Virginia Power System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to contracts between the Government, Virginia Electric and Power Company (hereinafter called the Company), the Company's Transmission Operator, currently PJM Interconnection LLC (hereinafter called PJM), and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the John H. Kerr and Philpott Projects and sold under appropriate contracts between the Government and the Customer. Document Available for Download

428

SOCO-2-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule SOCO-2-E Wholesale Power Rate Schedule Area: PowerSouth Off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate

429

SOCO-4-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule SOCO-4-E Wholesale Power Rate Schedule Area: OPC System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida served through the transmission facilities of Southern Company Services, Inc. (hereinafter called the Company) or the Georgia Integrated Transmission System. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects (hereinafter referred to collectively as the Projects) and sold under appropriate contracts between

430

REDUCTIONS WITHOUT REGRET: HISTORICAL PERSPECTIVES  

SciTech Connect

This is the first of three papers (in addition to an introductory summary) aimed at providing a framework for evaluating future reductions or modifications of the U.S. nuclear force, first by considering previous instances in which nuclear-force capabilities were eliminated; second by looking forward into at least the foreseeable future at the features of global and regional deterrence (recognizing that new weapon systems currently projected will have expected lifetimes stretching beyond our ability to predict the future); and third by providing examples of past or possible undesirable outcomes in the shaping of the future nuclear force, as well as some closing thoughts for the future. This paper examines the circumstances and consequences of the elimination of ? The INF-range Pershing II ballistic missile and Gryphon Ground-Launched Cruise Missile (GLCM), deployed by NATO under a dual-track strategy to counter Soviet intermediate-range missiles while pursuing negotiations to limit or eliminate all of these missiles. ? The Short-Range Attack Missile (SRAM), which was actually a family of missiles including SRAM A, SRAM B (never deployed), and SRAM II and SRAM T, these last two cancelled during an over-budget/behind-schedule development phase as part of the Presidential Nuclear Initiatives of 1991 and 1992. ? The nuclear-armed version of the Tomahawk Land-Attack Cruise Missile (TLAM/N), first limited to shore-based storage by the PNIs, and finally eliminated in deliberations surrounding the 2010 Nuclear Posture Review Report. ? The Missile-X (MX), or Peacekeeper, a heavy MIRVed ICBM, deployed in fixed silos, rather than in an originally proposed mobile mode. Peacekeeper was likely intended as a bargaining chip to facilitate elimination of Russian heavy missiles. The plan failed when START II did not enter into force, and the missiles were eliminated at the end of their intended service life. ? The Small ICBM (SICBM), or Midgetman, a road-mobile, single-warhead missile for which per-unit costs were climbing when it was eliminated under the PNIs. Although there were liabilities associated with each of these systems, there were also unique capabilities; this paper lays out the pros and cons for each. Further, we articulate the capabilities that were eliminated with these systems.

Swegle, J.; Tincher, D.

2013-09-09T23:59:59.000Z

431

Environmental Impact  

U.S. Energy Information Administration (EIA)

Environmental Impact - a single comprehensive bibliographic information resource on climate change & other impacts of humans on the biosphere.

432

A Process Integration Approach to the Strategic Design and Scheduling of Biorefineries  

E-Print Network (OSTI)

This work focused upon design and operation of biodiesel production facilities in support of the broader goal of developing a strategic approach to the development of biorefineries. Biodiesel production provided an appropriate starting point for these efforts. The work was segregated into two stages. Various feedstocks may be utilized to produce biodiesel, to include virgin vegetable oils and waste cooking oil. With changing prices, supply, and demand of feedstocks, a need exists to consider various feedstock options. The objective of the first stage was to develop a systematic procedure for scheduling and operation of flexible biodiesel plants accommodating a variety of feedstocks. This work employed a holistic approach and combination of process simulation, synthesis, and integration techniques to provide: process simulation of a biodiesel plant for various feedstocks, integration of energy and mass resources, optimization of process design and scheduling, and techno-economic assessment and sensitivity analysis of proposed schemes. An optimization formulation was developed to determine scheduling and operation for various feedstocks and a case study solved to illustrate the merits of the devised procedure. With increasing attention to the environmental impact of discharging greenhouse gases (GHGs), there has been growing public pressure to reduce the carbon footprint associated with fossil fuel use. In this context, one key strategy is substitution of fossil fuels with biofuels such as biodiesel. Design of biodiesel plants has traditionally been conducted based on technical and economic criteria. GHG policies have the potential to significantly alter design of these facilities, selection of feedstocks, and scheduling of multiple feedstocks. The objective of the second stage was to develop a systematic approach to design and scheduling of biodiesel production processes while accounting for the effect of GHG policies. An optimization formulation was developed to maximize profit of the process subject to flowsheet synthesis and performance modeling equations. The carbon footprint is accounted for through a life cycle analysis (LCA). The objective function includes a term reflecting the impact of the LCA of a feedstock and its processing to biodiesel. A multiperiod approach was used and a case study solved with several scenarios of feedstocks and GHG policies.

Elms, Rene ?Davina

2009-12-01T23:59:59.000Z

433

Maximising the net present value for resource-constrained project scheduling  

Science Conference Proceedings (OSTI)

The Resource-constrained Project Scheduling Problem (Rcpsp), in which a schedule must obey the resource constraints and the precedence constraints between pairs of activities, is one of the most studied scheduling problems. An important variation of ...

Andreas Schutt; Geoffrey Chu; Peter J. Stuckey; Mark G. Wallace

2012-05-01T23:59:59.000Z

434

Aluminum reduction cell electrode  

DOE Patents (OSTI)

The invention is directed to cathode modules comprised of refractory hard metal materials, such as TiB[sub 2], for an electrolytic cell for the reduction of alumina wherein the modules may be installed and replaced during operation of the cell and wherein the structure of the cathode modules is such that the refractory hard metal materials are not subjected to externally applied forces or rigid constraints. 9 figs.

Goodnow, W.H.; Payne, J.R.

1982-09-14T23:59:59.000Z

435

Thermochemical nitrate reduction  

DOE Green Energy (OSTI)

A series of preliminary experiments was conducted directed at thermochemically converting nitrate to nitrogen and water. Nitrates are a major constituent of the waste stored in the underground tanks on the Hanford Site, and the characteristics and effects of nitrate compounds on stabilization techniques must be considered before permanent disposal operations begin. For the thermochemical reduction experiments, six reducing agents (ammonia, formate, urea, glucose, methane, and hydrogen) were mixed separately with {approximately}3 wt% NO{sub 3}{sup {minus}} solutions in a buffered aqueous solution at high pH (13); ammonia and formate were also mixed at low pH (4). Reactions were conducted in an aqueous solution in a batch reactor at temperatures of 200{degrees}C to 350{degrees}C and pressures of 600 to 2800 psig. Both gas and liquid samples were analyzed. The specific components analyzed were nitrate, nitrite, nitrous oxide, nitrogen, and ammonia. Results of experimental runs showed the following order of nitrate reduction of the six reducing agents in basic solution: formate > glucose > urea > hydrogen > ammonia {approx} methane. Airnmonia was more effective under acidic conditions than basic conditions. Formate was also effective under acidic conditions. A more thorough, fundamental study appears warranted to provide additional data on the mechanism of nitrate reduction. Furthermore, an expanded data base and engineering feasibility study could be used to evaluate conversion conditions for promising reducing agents in more detail and identify new reducing agents with improved performance characteristics.

Cox, J.L.; Lilga, M.A.; Hallen, R.T.

1992-09-01T23:59:59.000Z

436

FINAL SCHEDULE FOR CHIEF OF STAFF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wednesday, July 11, 2001 Wednesday, July 11, 2001 10:00 AM PROGRAM DIRECTOR'S MEETING 10:30 AM Secretary's Conference Room Lead & Attending Staff: McSlarrow Attending Staff: McMonigle and Dandy Attendees: ESA2; ESA3 10:30 AM MEETING W/CHUCK DOMINY (HALLIBURTON 11:00 AM COMPANY) McSlarrow's Office Jim Andrews 11:45 AM DEPART EN ROUTE TO PLAZA 12:00 PM LUNCH MEETING 1:30 PM American Grill - Loew's Plaza 1:30 PM DEPART EN ROUTE TO DOE 2:00 PM ELECTRICITY ADVISORY BOARD 2:30 PM TBD 4:30 PM (T) MEETING W/GREG RENKES 5:00 PM McSlarrow's Office Page 13 (3/22/2002. 4:54 PM) Internal Distribution 26076 FINAL SCHEDULE FOR CHIEF OF STAFF Thursday, July 12, 2001 8:45 AM MEETING W/JEFF LAWRENCE & MICHAEL CROWE 9:00 AM (PROVOST/UNIV. OF COLUMBIA) McSlarrow's Office 10:00 AM DEFENSE MEETING 10:30 AM Secretary's Office

437

Utility Optimal Scheduling in Energy Harvesting Networks  

E-Print Network (OSTI)

In this paper, we show how to achieve close-to-optimal utility performance in energy harvesting networks with only finite capacity energy storage devices. In these networks, nodes are capable of harvesting energy from the environment. The amount of energy that can be harvested is time varying and evolves according to some probability law. We develop an \\emph{online} algorithm, called the Energy-limited Scheduling Algorithm (ESA), which jointly manages the energy and makes power allocation decisions for packet transmissions. ESA only has to keep track of the amount of energy left at the network nodes and \\emph{does not require any knowledge} of the harvestable energy process. We show that ESA achieves a utility that is within $O(\\epsilon)$ of the optimal, for any $\\epsilon>0$, while ensuring that the network congestion and the required capacity of the energy storage devices are \\emph{deterministically} upper bounded by bounds of size $O(1/\\epsilon)$. We then also develop the Modified-ESA algorithm (MESA) to ac...

Huang, Longbo

2010-01-01T23:59:59.000Z

438

Polynomial Time Algorithms for Minimum Energy Scheduling  

E-Print Network (OSTI)

The aim of power management policies is to reduce the amount of energy consumed by computer systems while maintaining satisfactory level of performance. One common method for saving energy is to simply suspend the system during the idle times. No energy is consumed in the suspend mode. However, the process of waking up the system itself requires a certain fixed amount of energy, and thus suspending the system is beneficial only if the idle time is long enough to compensate for this additional energy expenditure. In the specific problem studied in the paper, we have a set of jobs with release times and deadlines that need to be executed on a single processor. Preemptions are allowed. The processor requires energy L to be woken up and, when it is on, it uses one unit of energy per one unit of time. It has been an open problem whether a schedule minimizing the overall energy consumption can be computed in polynomial time. We solve this problem in positive, by providing an O(n^5)-time algorithm. In addition we pr...

Baptiste, Philippe; Durr, Christoph

2009-01-01T23:59:59.000Z

439

ARRT Courses & Schedule | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

ARRT Courses & Schedule ARRT Courses & Schedule ARRT Courses & Schedule Advanced Radiological Response Techniques (ARRT) Courses The ARRT series, developed by the Defense Nuclear Weapons School, was designed specifically for the National Guard Bureau's Weapons of Mass Destruction's Civil Support Teams. The course, however, is open to other agencies that may have radiological response missions. Scenario-driven exercises cover everything from radiation fundamentals and material detection to handling and safely containing nuclear materials. The ARRT series can be used as either initial training or a refresher for attendees. Topics include the following: Consequence Management Contaminated Casualty Extraction Contamination Control Decontamination Hotline Operations Material Packaging

440

EXPERIMENTS, CONCEPTUAL DESIGN, PRELIMINARY COST ESTIMATES AND SCHEDULES FOR AN UNDERGROUND RESEARCH FACILITY  

E-Print Network (OSTI)

Design, Preliminary Cost Estimates and Schedules roroundDESIGN, PRELIMINARY COST ESTIMATES AND SCHEDULES FOR ANSchedule and Cost Estimates Excavation Damage/Sealing

Korbin, G.

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

On the longest perpetual reductions in orthogonal expression reduction systems  

Science Conference Proceedings (OSTI)

We study perpetual reductions in orthogonal (or conflict-free) fully extended expression reduction systems (OERS). ERS is a formalism for rewriting that subsumes term rewriting systems (TRSs) and the &lgr;-calculus. We design a strategy ... Keywords: &lgr;-calculus, perpetual reductions, rewrite systems, strong normalization

Zurab Khasidashvili

2001-09-01T23:59:59.000Z

442

DOE Announces Yucca Mountain License Application Schedule | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Yucca Mountain License Application Schedule Yucca Mountain License Application Schedule DOE Announces Yucca Mountain License Application Schedule July 19, 2006 - 3:13pm Addthis New Director Ward Sproat Testifies on Revised Timeline WASHINGTON, DC - The Department of Energy (DOE) today announced that it will submit a license application to the Nuclear Regulatory Commission (NRC) for a nuclear waste repository at Yucca Mountain, Nevada, no later than June 30, 2008. The Department also announced that if requested legislative changes are enacted, the repository will be able to accept spent nuclear fuel and high-level waste starting in early 2017. Announcing a schedule for submitting a license application is another step in the Department's mission to provide stability, clarity and predictability in moving the Yucca Mountain Project forward as quickly as

443

Potomac River Project Outage Schedule Clarification | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River Project Outage Schedule Clarification River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

444

Potomac River Project Outage Schedule Clarification | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Potomac River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Potomac River Project Outage Schedule Clarification Docket No. EO-05-01. Order No. 202-07-02: Based on the most current information we have for both circuits, the new outage dates are listed below: Outage Duration Feeder Out April 30, 2007 - June 1, 2007 Circuit 1 June 2, 2007 - July 1, 2007 Circuit 2 Potomac River Project Outage Schedule Clarification More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) evised plan for transmission outages for the 230 kV circuits Notification of Planned 230kV Outage at Potomac River Generating Station PEPCO Comments on Special Environmental Analysis For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the

445

SSRL Experimental Run Schedule | Stanford Synchrotron Radiation Lightsource  

NLE Websites -- All DOE Office Websites (Extended Search)

Experimental Run Schedule Experimental Run Schedule SLAC National Accelerator Laboratory will be closed for the winter holidays, December 21, 2013 through January 5, 2014. SSRL generally operates November through August, using the shutdown period for upgrades and maintenance projects. SSRL operates at 500mA and employs a frequent fill schedule to maintain the SPEAR3 current approximately constant. Automatic injections will be conducted every 5 minutes. Automatic injections will only occur at the designated 5 minute intervals (i.e., on the hour and every 5 minutes thereafter). If the injector is not functional at the designated fill time, then the fill will be skipped. The current will be replenished at the next scheduled fill time after the injector is repaired and normal injection intervals will resume. The operator will give

446

QAMF-002_ACourse Registry/Review Schedule Intitial Release D  

NLE Websites -- All DOE Office Websites (Extended Search)

2_ACourse Registry/Review Schedule 2_ACourse Registry/Review Schedule Intitial Release D E A B C Revision History: Rev. Description of Change [N/A Referenced Documents: Parent Document: QAMF-002 Rev. A Approvers: Melissa Otero Document Owner: Elizabeth Sousa Backup Owner: Notify of Changes: EOTA - Business Form Document Title: QAMP-002 Project/Course Maintenance Process Document Number: Course Registry/Review Schedule EOTA Employees Melissa Otero QAMF-002_ACourse Registry/Review Schedule CIP100D Introduction to Analytical Risk Management CIP101DW DOE/NNSA Asset Overview (formerly RAP-165DW) CIP110DW Vehicle Bomb Search Methods CIP300DC Weapons of Mass Destruction (WMD): Training CIP400DC Weapons of Mass Destruction (WMD): Training Exercises CMP101DW Operations Overview of Consequence Management CMP104DW Health and Safety Orientation

447

Underground Injection Control Fee Schedule (West Virginia) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Injection Control Fee Schedule (West Virginia) Injection Control Fee Schedule (West Virginia) Underground Injection Control Fee Schedule (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Fees Provider Department of Environmental Protection This rule establishes schedules of permit fees for state under-ground injection control permits issued by the Chief of the Office of Water Resources. This rule applies to any person who is required to apply for and

448

Assessing tram schedules using a library of simulation components  

Science Conference Proceedings (OSTI)

Assessing tram schedules is important to assure an efficient use of infrastructure and for the provision of a good quality service. Most existing infrastructure modeling tools provide support to assess an individual aspect of rail systems in isolation, ...

Elisangela Mieko Kanacilo; Alexander Verbraeck

2007-12-01T23:59:59.000Z

449

Do Wind Forecasts Make Good Generation Schedules? Preprint  

SciTech Connect

Energy market scheduling conventions can needlessly increase the wind balancing area's regulation requirements. This economic inefficiency can be eliminated once it is recognized. The paper provides a detailed discussion of these issues.

Dragoon, K.; Kirby, B.; Milligan, M.

2008-06-01T23:59:59.000Z

450

Definition: Ramp Rate(Schedule) | Open Energy Information  

Open Energy Info (EERE)

interchange schedule References Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline...

451

An Automatic Scheduler for Parallel Machines (Research Note)  

Science Conference Proceedings (OSTI)

This paper presents a static scheduler to carry out the best assignment of a Directed Acyclic Graph (DAG) representing an application program. Some characteristics of the DAG, a decision model, and the evaluation parameters for choosing the best solution ...

Mauricio Solar; Mario Inostroza

2002-08-01T23:59:59.000Z

452

Stream combination: Adaptive IO scheduling for streaming servers  

E-Print Network (OSTI)

Cycle-based IO schedulers use statically configured timecycle durations. As a result, they are unable to avoid the formation of virtual bottlenecks. We term a bottleneck as virtual when it occurs within a single resource subsystem, and it is possible to use a secondary under-utilized resource to thwart the bottleneck. The primary reason for virtual bottlenecks in streaming servers is static allocation of memory and disk-bandwidth resources using fixed time-cycle durations. As a result, shifting request workload can cause a virtual bottleneck either in the memory or disk subsystem. We present stream combination, an adaptive IO scheduling technique that addresses this problem in a comprehensive fashion. Stream combination predicts the formation of virtual bottlenecks and proactively alters the IO schedule to avoid them. A simulation study suggests significant performance gains compared to the current state-of-the-art fixed time-cycle IO scheduler. 1

Bin Liu; Raju Rangaswami

2006-01-01T23:59:59.000Z

453

Scheduling blocks of hierarchical compiled simulation of combinational circuits  

Science Conference Proceedings (OSTI)

Several algorithms for scheduling high-level functional blocks that assume the blocks may not be physically divided and that pseudocycles may be present due to the grouping of elements within blocks are presented. These algorithms rely on dependency ...

P. M. Maurer

2006-11-01T23:59:59.000Z

454

Approximate resolution of a resource-constrained scheduling problem  

E-Print Network (OSTI)

Apr 10, 2006... extensive computational results demonstrating its practical ability to produce ... Category 2: Applications -- OR and Management Sciences (Scheduling ) ... Citation: Report n PB/BSC/INF/016550, Nortel GSM Access R&D,...

455

Performance driven multi-objective distributed scheduling for parallel computations  

Science Conference Proceedings (OSTI)

With the advent of many-core architectures and strong need for Petascale (and Exascale) performance in scientific domains and industry analytics, efficient scheduling of parallel computations for higher productivity and performance has become very important. ...

Ankur Narang; Abhinav Srivastava; Naga Praveen Kumar Katta; Rudrapatna K. Shyamasundar

2011-07-01T23:59:59.000Z

456

Parallel parametric combinatorial search : its application to runway scheduling  

E-Print Network (OSTI)

The Runway Scheduling Problem (RSP) addresses the fundamental issues of airport congestion and energy conservation. It is a variation of the Traveling Salesman Problem (TSP) from which it differs in three basic points: the ...

Trivizas, Dionyssios Anastasios

1987-01-01T23:59:59.000Z

457

Schedule of event - World Conference on Oilseed Processing  

Science Conference Proceedings (OSTI)

short course, luncheons, poster and oral presentations Schedule of event - World Conference on Oilseed Processing Biofuels and Bioproducts and Biodiesel Processing Elearning Olive oil Industry Events Industrial Oil Products Abstracts Program Trav

458

Constraint-Based charging scheduler design for electric vehicles  

Science Conference Proceedings (OSTI)

This paper proposes an efficient charging scheduler for electric vehicles and measures its performance, aiming at reducing peak power consumption while satisfying the diverse constraints specified in each charging request. Upon the arrival of a charging ...

Hye-Jin Kim; Junghoon Lee; Gyung-Leen Park

2012-03-01T23:59:59.000Z

459

An improved formulation of the underground mine scheduling ...  

E-Print Network (OSTI)

ation of mine production schedules that improve profitability through selective mining. As a secondary contribution, an improved formulation set within a resource production/consumption framework is presented, ...... Exploration, 2001. 7.

460

Solving a log-truck scheduling problem with constraint programming  

Science Conference Proceedings (OSTI)

Scheduling problems in the forest industry have received significant attention in the recent years and have contributed many challenging applications for optimization technologies. This paper proposes a solution method based on constraint programming ...

Nizar El Hachemi; Michel Gendreau; Louis-Martin Rousseau

2008-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Environment/Health/Safety (EHS) Training: Monthly Training Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

EHS Training Calendar This Google Calendar lists all of the EHS Training sessions that have been scheduled. Please login using your LDAP to access the calendar. Click on the course...

462

Do Wind Forecasts Make Good Generation Schedules? Preprint  

DOE Green Energy (OSTI)

Energy market scheduling conventions can needlessly increase the wind balancing area's regulation requirements. This economic inefficiency can be eliminated once it is recognized. The paper provides a detailed discussion of these issues.

Dragoon, K.; Kirby, B.; Milligan, M.

2008-06-01T23:59:59.000Z

463

Schedule for 2013 Oak Ridge Wildlife Management Area (ORWMA)...  

NLE Websites -- All DOE Office Websites (Extended Search)

Schedule for 2013 Oak Ridge Wildlife Management Area (ORWMA) Spring Turkey Hunts Scouting day - April 6th Hunt Weekend - April 13th-14th Hunt Weekend - April 20th -21st These...

464

Scheduling functional regression tests for IBM DB2 products  

Science Conference Proceedings (OSTI)

Functional Regression Testing (FRT) is performed to ensure that a new version of a product functions properly as designed. In a corporate environment, the large numbers of test jobs and the complexity of scheduling the jobs on different platforms make ...

Edward Xia; Igor Jurisica; Julie Waterhouse; Valerie Sloan

2005-10-01T23:59:59.000Z

465

Maintenance scheduling problems as benchmarks for constraint algorithms  

Science Conference Proceedings (OSTI)

The paper focuses on evaluating constraint satisfaction search algorithms on application based random problem instances. The application we use is a well‐studied problem in the electric power industry: optimally scheduling preventive ...

Daniel Frost; Rina Dechter

1999-09-01T23:59:59.000Z

466

Exhibit D: Mirant Potomac River Schedule of Unit Operations:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, January - March 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 4, January - March 2006 Docket No. EO-05-01: Exhibit D: Mirant Potomac River...

467

Exhibit D: Mirant Potomac River Schedule of Unit Operations:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplement 3, January and February 2006 Exhibit D: Mirant Potomac River Schedule of Unit Operations: Supplement 3, January and February 2006 Docket No. EO-05-01: Exhibit D: Mirant...

468

Faster approximation algorithms for scheduling with fixed jobs  

Science Conference Proceedings (OSTI)

We study the problem of scheduling jobs on identical parallel machines without preemption. In the considered setting, some of the jobs are already assigned machines and starting times, for example due to external constraints not explicitly modelled. ...

Klaus Jansen, Lars Prdel, Ulrich M. Schwarz, Ola Svensson

2011-01-01T23:59:59.000Z

469

Scheduling parallel algorithms in computer algebra (using ... - CECM  

E-Print Network (OSTI)

cilkc -cilk-profile -cilk-span -O2 -I . getoptions.o strassen.cilk -o strassen-p ./ strassen-profile .... Cilk's randomized work-stealing scheduler load-balances the.

470

Battery aware dynamic scheduling for periodic task graphs  

Science Conference Proceedings (OSTI)

Battery lifetime, a primary design constraint for mobile embedded systems, has been shown to depend heavily on the load current profile. This paper explores how scheduling guidelines from battery models can help in extending battery capacity. It then ...

Venkat Rao; Nicolas Navet; Gaurav Singhal; Anshul Kumar; G. S. Visweswaran

2006-04-01T23:59:59.000Z

471

igure 4. Production Schedules at Two Development Rates for the...  

U.S. Energy Information Administration (EIA) Indexed Site

4. Production Schedules at Two Development Rates for the Statistical Mean of Recovering 10.3 Billion Barrels of Technically Recoverable Oil from the ANWR Coastal Plain of Alaska...

472

Figure 3. Production Schedules at Two Development Rates  

U.S. Energy Information Administration (EIA) Indexed Site

3. Production Schedules at Two Development Rates for the 95 Percent Probability of Recovering 5.7 Billion Barrels of Technically Recoverable Oil from the ANWR Coastal Plain of...

473

Figure 5. Production Schedules at Two Development Rates for the...  

Annual Energy Outlook 2012 (EIA)

5. Production Schedules at Two Development Rates for the 5 Percent Probability of Recovering 16.0 Billion Barrels of Technically Recoverable Oil from the ANWR Coastal Plain of...

474

Scheduling in switched queueing networks with heavy-tailed trac  

E-Print Network (OSTI)

We study scheduling problems arising in switched queueing networks, a class of stochastic systems that are often used to model data communication networks, such as uplinks and downlinks of cellular networks, networks of ...

Markakis, Mihalis G

2013-01-01T23:59:59.000Z

475

Multicore Scheduling for Network Applications Based on Highest Random Weight  

E-Print Network (OSTI)

comparison. Execution Time (usec) ori_sched ori_mt aff_schedAHRW H-AHRW Execution Time (usec) Fig. 5.7: Scaled executionOverhead Scheduling Overhead (usec) GOP Transcoding Time (

Guo, Danhua

2010-01-01T23:59:59.000Z

476

NanoFab User Facility Usage Fee Schedule  

Science Conference Proceedings (OSTI)

Page 1. NanoFab User Facility Usage Fee Schedule Effective 11/1/09 Tool Full Rate ($/hr) Reduced Rate ($/hr) Base NanoFab Use 60 30 ...

477

Network scheduling for data archiving applications in sensor networks  

Science Conference Proceedings (OSTI)

Since data archiving in sensor networks is a communication intensive application, a careful power management of communication is of critical importance for such networks. An example is FPS, an adaptive power scheduling algorithm that combines slotted ...

Yong Yao; S. M. Nazrul Alam; Johannes Gehrke; Sergio D. Servetto

2006-09-01T23:59:59.000Z

478

International conference on anthrax scheduled in September for...  

NLE Websites -- All DOE Office Websites (Extended Search)

conference on anthrax scheduled in September for researchers Stephen P Wampler, LLNL, (925) 423-3107, wampler1@llnl.gov Printer-friendly Scientists and researchers from all...

479

Approximation algorithms for stochastic scheduling on unrelated machines  

E-Print Network (OSTI)

Motivated by problems in distributed computing, this thesis presents the first nontrivial polynomial time approximation algorithms for an important class of machine scheduling problems. We study the family of preemptive ...

Scott, Jacob (Jacob Healy)

2008-01-01T23:59:59.000Z

480

Analytic framework for TRL-based cost and schedule models  

E-Print Network (OSTI)

Many government agencies have adopted the Technology Readiness Level (TRL) scale to help improve technology development management under ever increasing cost, schedule, and complexity constraints. Many TRL-based cost and ...

El-Khoury, Bernard

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "reduction impact schedule" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Proposal Submittal and Scheduling Procedures for Research | Stanford  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Submittal and Scheduling Procedures for Research Proposal Submittal and Scheduling Procedures for Research New Proposals Standard GU Proposals Instructions for New Standard Proposals (Not LOI or Rapid Access) Tips for How to Wow Rapid Access Letter of Intent (LOI) Proposal Extension Requests X-ray/VUV Macromolecular Crystallography Beam Time Allocation/Scheduling How to Request Beam Time SSRL Access Policy SSRL Schedules New Proposals SSRL operates as a dedicated synchrotron radiation source for approximately nine months per year (usually from early November through early August). Submitting a proposal is the first step to access beam time at SSRL. SSRL scientists are available to help answer questions about the accelerator (SPEAR3), beam lines, capabilities, science or techniques to help users plan their experiments and their SSRL proposals.

482

Application Of Least Squares And Kriging In Multivariate Optimizations Of Field Development Scheduling And Well Placement Design  

E-Print Network (OSTI)

This study applied two multivariate interpolation algorithms, Least Squares and Kriging, to interpolate a limited number of data obtained from simulation in order to predict the optimal strategies in a field development scheduling project and a waterflood project with a significant reduction in the simulation efforts required. The two projects were application examples with known answers. The objective of this study was to examine the feasibility and efficiency of multivariate interpolation in solving optimization problems by reducing the simulation effort required. The net present value was used as the objective function in both projects. The field development scheduling simulation was achieved by an economic model taking acount of all the costs and profits during the time period being studied. The waterflooding simulation was achieved by solving the Laplace equation and generating streamlines within the specified pattern. The movements of the waterfrontwere tracked and then the oil a...

A Report; Yan Pan

1995-01-01T23:59:59.000Z

483

Dynamic priority scheduling-based MAC for wireless sensor networks  

Science Conference Proceedings (OSTI)

In this paper, one of the most important issues supporting real-time QoS in wireless sensor networks is discussed, which is fundamentally a challenging problem. A novel MAC protocol based on dynamic priority scheduling is proposed for wireless sensor ... Keywords: MAC, Motes MICA 2, QoS, WSNs, dynamic priority scheduling, medium access control, quality of service, wireless networks, wireless sensor networks

Jiming Chen; Youxian Sun

2007-04-01T23:59:59.000Z

484

NETL: Turbine Projects - Emissions Reduction  

NLE Websites -- All DOE Office Websites (Extended Search)

Emissions Reduction Turbine Projects Emissions Reduction Pre-Mixer Design for High Hydrogen Fuels DataFact Sheets Low-NOX Emissions in a Fuel Flexible Gas Turbine Combustor Design...

485

Microgrid Reliability Modeling and Battery Scheduling Using Stochastic  

NLE Websites -- All DOE Office Websites (Extended Search)

Reliability Modeling and Battery Scheduling Using Stochastic Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming Title Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming Publication Type Journal Article Refereed Designation Refereed LBNL Report Number LBNL-6309E Year of Publication 2013 Authors Cardoso, Gonçalo, Michael Stadler, Afzal S. Siddiqui, Chris Marnay, Nicholas DeForest, Ana Barbosa-Póvoa, and Paulo Ferrão Journal Journal of Electric Power Systems Research Volume 103 Pagination 61-69 Date Published 06/2013 Abstract This paper describes the introduction of stochastic linear programming into Operations DER-CAM, a tool used to obtain optimal operating schedules for a given microgrid under local economic and environmental conditions. This application follows previous work on optimal scheduling of a lithium-iron-phosphate battery given the output uncertainty of a 1 MW molten carbonate fuel cell. Both are in the Santa Rita Jail microgrid, located in Dublin, California. This fuel cell has proven unreliable, partially justifying the consideration of storage options. Several stochastic DER-CAM runs are executed to compare different scenarios to values obtained by a deterministic approach. Results indicate that using a stochastic approach provides a conservative yet more lucrative battery schedule. Lower expected energy bills result, given fuel cell outages, in potential savings exceeding 6%.

486

Gain Scheduled Control Using the Dual Youla Parameterization  

E-Print Network (OSTI)

Stability is a critical issue in gain-scheduled control problems in that the closed loop system may not be stable during the transitions between operating conditions despite guarantees that the gain-scheduled controller stabilizes the plant model at fixed values of the scheduling variable. For Linear Parameter Varying (LPV) model representations, a controller interpolation method using Youla parameterization that guarantees stability despite fast transitions in scheduling variables is proposed. By interconnecting an LPV plant model with a Local Controller Network (LCN), the proposed Youla parameterization based controller interpolation method allows the interpolation of controllers of different size and structure, and guarantees stability at fixed points over the entire operating region. Moreover, quadratic stability despite fast scheduling is also guaranteed by construction of a common Lyapunov function, while the characteristics of individual controllers designed a priori at fixed operating condition are recovered at the design points. The efficacy of the proposed approach is verified with both an illustrative simulation case study on variation of a classical MIMO control problem and an experimental implementation on a multi-evaporator vapor compression cycle system. The dynamics of vapor compression systems are highly nonlinear, thus the gain-scheduled control is the potential to achieve the desired stability and performance of the system. The proposed controller interpolation/switching method guarantees the nonlinear stability of the closed loop system during the arbitrarily fast transition and achieves the desired performance to subsequently improve thermal efficiency of the vapor compression system.

Chang, Young Joon

2010-05-01T23:59:59.000Z

487

A method for developing visually intelligent construction scheduling data  

E-Print Network (OSTI)

The integration of methods, materials, and manpower is the basis for planning the activities of a construction project. The scheduling of these resources used during the construction of buildings is a critical factor that can dramatically affect a project's budget, timeline, and overall success. Consequently, much effort should be placed on the schedule's development to define an accurate timeline of predicted construction activities. To aid this effort, tools such as activity-based simulation models and three-dimensional visualization techniques have been utilized to improve the accuracy of scheduling. While simulation models use general programming language to create numeric models of processes in areas of management and manufacturing, construction visualization allows still and animated visual analyses of three-dimensional virtual worlds. Thus, this research integrates numerical activity-based simulation with visual animation to create optimized and intelligent construction scheduling data. This integration improves the accuracy, prediction, and comprehensive capability of construction schedules. The results show that efficiently scheduled construction processes can be created to reduce time and costs and provide visual training data for the owners, contractors, and workers.

Pilgrim, Brent Christian

2001-01-01T23:59:59.000Z

488

Report: Technical Uncertainty and Risk Reduction  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TECHNICAL UNCERTAINTY AND RISK REDUCTION TECHNICAL UNCERTAINTY AND RISK REDUCTION Background In FY 2007 EMAB was tasked to assess EM's ability to reduce risk and technical uncertainty. Board members explored this topic throughout the year as a component of their focus on the previously discussed topic of Discretionary Budgeting. Discussion Understanding the risks and variability associated with EM's projects is a challenging task that has the potential to significantly impact the program's established baselines. According to budget personnel, EM has established a database of baseline variables and possibilities; however, this tool is project-specific and does not apply to the greater complex. The Board believes that EM could benefit from incorporating an additional and more comprehensive data point into the baseline development process that budgets

489

facial reduction and extended duals  

E-Print Network (OSTI)

Facial reduction and extended duals Here we study two fundamental approaches ...... denberghe, and Henry Wolkowicz, editors, Handbook of semidefinite...

490

ALUMINIUM REDUCTION TECHNOLOGY: V: Fundamentals  

Science Conference Proceedings (OSTI)

ALUMINIUM REDUCTION TECHNOLOGY: Session V: Fundamentals. Sponsored by: LMD Aluminum Committee Program Organizer: Harald A. ye, Institute of...

491

Global Threat Reduction Initiative  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nonproliferation Nonproliferation U.S. DEPARTMENT OF ENERGY 1 The Current Status of Gap and U.S.-Origin Nuclear Fuel Removals 2011 Jeff Galan, Deputy Project Manager U.S.-Origin Nuclear Remove Program National Nuclear Security Administration Global Threat Reduction Initiative Defense Nuclear Nonproliferation U.S. DEPARTMENT OF ENERGY 2 GTRI Mission and Goals GTRI is: A part of President Obama's comprehensive strategy to prevent nuclear terrorism; and The key organization responsible for implementing the U.S. HEU minimization policy. GTRI MISSION Reduce and protect vulnerable nuclear and radiological material located at civilian sites worldwide. DOE STRATEGIC GOAL 2.2 Prevent the acquisition of nuclear and radiological materials for use in weapons of mass destruction and other

492

Aluminum reduction cell electrode  

DOE Patents (OSTI)

The invention is directed to an anode-cathode structure for an electrolytic cell for the reduction of alumina wherein the structure is comprised of a carbon anode assembly which straddles a wedge-shaped refractory hard metal cathode assembly having steeply sloped cathodic surfaces, each cathodic surface being paired in essentially parallel planar relationship with an anode surface. The anode-cathode structure not only takes into account the structural weakness of refractory hard metal materials but also permits the changing of the RHM assembly during operation of the cell. Further, the anode-cathode structure enhances the removal of anode gas from the interpolar gap between the anode and cathode surfaces. 10 figs.

Payne, J.R.

1983-09-20T23:59:59.000Z

493

Site Energy Reduction Program  

E-Print Network (OSTI)

DuPonts Sabine River Works site is the largest energy consuming location within DuPont. In the year 2000, each production area was encouraged to reduce energy costs. By 2003 site energy consumption was down 16% on an absolute basis and 12% on a BTU/LB basis. By 2004, overall progress had slowed, energy consumption increased slightly, and area results were mixed. It was time to shake things up with a new perspective. A coordinated site energy program was launched. In 2005, the first full year of the unified program, the site saved $6.9 MM from energy reduction projects. The rate of improvement is accelerating in 2006 with $3.6 MM in energy projects being implemented in the first four months.

Jagen, P. R.

2007-01-01T23:59:59.000Z

494

Dose Reduction Techniques  

SciTech Connect

As radiation safety specialists, one of the things we are required to do is evaluate tools, equipment, materials and work practices and decide whether the use of these products or work practices will reduce radiation dose or risk to the environment. There is a tendency for many workers that work with radioactive material to accomplish radiological work the same way they have always done it rather than look for new technology or change their work practices. New technology is being developed all the time that can make radiological work easier and result in less radiation dose to the worker or reduce the possibility that contamination will be spread to the environment. As we discuss the various tools and techniques that reduce radiation dose, keep in mind that the radiological controls should be reasonable. We can not always get the dose to zero, so we must try to accomplish the work efficiently and cost-effectively. There are times we may have to accept there is only so much you can do. The goal is to do the smart things that protect the worker but do not hinder him while the task is being accomplished. In addition, we should not demand that large amounts of money be spent for equipment that has marginal value in order to save a few millirem. We have broken the handout into sections that should simplify the presentation. Time, distance, shielding, and source reduction are methods used to reduce dose and are covered in Part I on work execution. We then look at operational considerations, radiological design parameters, and discuss the characteristics of personnel who deal with ALARA. This handout should give you an overview of what it takes to have an effective dose reduction program.

WAGGONER, L.O.

2000-05-16T23:59:59.000Z

495

Solving production scheduling with earliness/tardiness penalties by constraint programming  

Science Conference Proceedings (OSTI)

This paper deals with an application of constraint programming in production scheduling with earliness and tardiness penalties that reflects the scheduling part of the Just-In-Time inventory strategy. Two scheduling problems are studied, an industrial ... Keywords: Constraint programming, Earliness/tardiness cost, Production scheduling

Jan Kelbel; Zden?k Hanzlek

2011-08-01T23:59:59.000Z

496

Improving Multi-agent Evolutionary Techniques with Local Search for Job Shop Scheduling Problem  

Science Conference Proceedings (OSTI)

Scheduling is the allocation of shared resources over time in order to perform a number of tasks. Job Shop Scheduling Problem (JSSP) is the most commonly encountered scheduling problem. A wide range of approaches have been proposed to solve it. In this ... Keywords: Genetic Algorithm, Particle Swarm Optimization, Multi-Agent System, Job Schop Scheduling

Ahmad Balid; Sonajharia Minz

2008-12-01T23:59:59.000Z

497

A Performance Analysis of Transposition-Table-Driven Work Scheduling in Distributed Search  

Science Conference Proceedings (OSTI)

This paper discusses a new work-scheduling algorithm for parallel search of single-agent state spaces, called Transposition-Table-Driven Work Scheduling, that places the transposition table at the heart of the parallel work scheduling. The scheme results ... Keywords: Distributed search, single-agent search, work pushing, Transposition-Table-Driven Work Scheduling (TDS), IDA*

John W. Romein; Henri E. Bal; Jonathan Schaeffer; Aske Plaat

2002-05-01T23:59:59.000Z

498

A hybrid heuristic-genetic algorithm for task scheduling in heterogeneous processor networks  

Science Conference Proceedings (OSTI)

Efficient task scheduling on heterogeneous distributed computing systems (HeDCSs) requires the consideration of the heterogeneity of processors and the inter-processor communication. This paper presents a two-phase algorithm, called H2GS, for task scheduling ... Keywords: Directed acyclic graph, Genetic algorithms, Heterogeneous systems, List-based scheduling heuristics, Parallel and distributed processing, Task scheduling

Mohammad I. Daoud; Nawwaf Kharma

2011-11-01T23:59:59.000Z

499

A rock-paper-scissors evolutionary algorithm for the TDMA broadcast scheduling problem  

Science Conference Proceedings (OSTI)

In wireless ad-hoc networks, the broadcast scheduling problem (BSP) is commonly viewed as a well-known NP-complete combinatorial optimization problem. The purpose of the BSP is to achieve a transmission schedule with collision-free time slots in a time ... Keywords: Broadcast scheduling problem, Evolutionary algorithm, Optimum transmission schedule, Rock-paper-scissors, Time division multiple access

Chih-Chiang Lin, Pi-Chung Wang

2013-08-01T23:59:59.000Z

500

EIS-0236: Notice of Intent to Prepare a Supplemental Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supplemental Environmental Supplemental Environmental Impact Statement for the Programmatic Environmental Impact Statement EIS-0236: Notice of Intent to Prepare a Supplemental Environmental Impact Statement for the Programmatic Environmental Impact Statement Stockpile Stewardship and Management The Department of Energy (DOE) is announcing a revised schedule for its preparation of a Draft Supplemental Environmental Impact Statement (SEIS) for the National Ignition Facility portion (Volume III, Appendix I) of the Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (DOE/EIS-0236; September, 1997). EIS-0236, Notice of Intent to prepare Supplemental Environmental Impact Statement for the Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (August 1999)