Powered by Deep Web Technologies
Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

HARVARD UNIVERSITY MISSING RECEIPT AFFIDAVIT  

E-Print Network [OSTI]

of the car rental agreement. Please reimburse me based on the following information: Dates Rental Company Car agreement receipt · Personal Car Usage ­ receipts for tolls and parking and daily mileage log listing date

Heller, Eric

2

FY04 Inspection Results for Wet Uruguay Fuel in L-Basin  

SciTech Connect (OSTI)

The 2004 visual inspection of four Uruguay nuclear fuel assemblies stored in L-Basin was completed. This was the third inspection of this wet stored fuel since its arrival in the summer of 1998. Visual inspection photographs of the fuel from the previous and the recent inspections were compared and no evidence of significant corrosion was found on the individual fuel plate photographs. Fuel plates that showed areas of pitting in the cladding during the original receipt inspection were also identified during the 2004 inspection. However, a few pits were found on the non-fuel aluminum clamping plates that were not visible during the original and 2001 inspections.

VORMELKER, PHILIP

2005-09-01T23:59:59.000Z

3

How to Handle 'Routine' Inspections  

SciTech Connect (OSTI)

Nondestructive examination (NDE) utilized for preservice or inservice inspection provides valuable information relating to the quality and integrity of fabricated components. This document describes the importance of detailed preparation for nondestructive examination regardless of the complexity, periodicity or routine nature of the examinations/inspections being performed.

Chris T. Brown

2013-04-01T23:59:59.000Z

4

Solar Energy Gross Receipts Tax Deduction  

Broader source: Energy.gov [DOE]

New Mexico has a gross receipts tax structure for businesses instead of a sales tax. Businesses are taxed on the gross amount of their business receipts each year before expenses are deducted....

5

TRANSPORTATION CASK RECEIPT AND RETURN FACILITY WORKER DOSE ASSESSMENT  

SciTech Connect (OSTI)

The purpose of this design calculation is to estimate radiation doses received by personnel working in the Transportation Cask Receipt and Return Facility (TCRRF) of the repository including the personnel at the security gate and cask staging areas. This calculation is required to support the preclosure safety analysis (PCSA) to ensure that the predicted doses are within the regulatory limits prescribed by the U.S. Nuclear Regulatory Commission (NRC). The Cask Receipt and Return Facility receives NRC licensed transportation casks loaded with spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The TCRRF operation starts with the receipt, inspection, and survey of the casks at the security gate and the staging areas, and proceeds to the process facilities. The transportation casks arrive at the site via rail cars or trucks under the guidance of the national transportation system. This calculation was developed by the Environmental and Nuclear Engineering organization and is intended solely for the use of Design and Engineering in work regarding facility design. Environmental and Nuclear Engineering personnel should be consulted before using this calculation for purposes other than those stated herein or for use by individuals other than authorized personnel in the Environmental and Nuclear Engineering organization.

V. Arakali

2005-02-24T23:59:59.000Z

6

Inspection & Maintenance  

E-Print Network [OSTI]

vehicles they own or control: 1. Preventative maintenance/safety inspections at least every 3 to 6 months provides a Preventive Maintenance Check List for guidance and scheduling. 2. If a vehicle is under warranty, Fleet Services will ensure the vehicle has at least the normal preventative, scheduled maintenance

7

Prepared  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofofOxford SiteToledo SiteTonawandaUniversity21Prepared by Oak Ridge

8

Film Badge Application Radioactive Material Package Receipt Log  

E-Print Network [OSTI]

;RADIOACTIVE MATERIAL PACKAGE RECEIPT LOG DATE: DELIVERED BY: AUTHORIZED BY: Contamination Check DPM/100 cm2APPENDIX A Film Badge Application Radioactive Material Package Receipt Log Radioactive Material Package Receipt Form (Off-Campus Locations) Radiation / Contamination Survey Form #12;PERSONNEL MONITORING

Slatton, Clint

9

Optical fiber inspection system  

DOE Patents [OSTI]

A remote optical inspection system including an inspection head. The inspection head has a passageway through which pellets or other objects are passed. A window is provided along the passageway through which light is beamed against the objects being inspected. A plurality of lens assemblies are arranged about the window so that reflected light can be gathered and transferred to a plurality of coherent optical fiber light guides. The light guides transfer the light images to a television or other image transducer which converts the optical images into a representative electronic signal. The electronic signal can then be displayed on a signal viewer such as a television monitor for inspection by a person. A staging means can be used to support the objects for viewing through the window. Routing means can be used to direct inspected objects into appropriate exit passages for accepted or rejected objects. The inspected objects are advantageously fed in a singular manner to the staging means and routing means. The inspection system is advantageously used in an enclosure when toxic or hazardous materials are being inspected. 10 figs.

Moore, F.W.

1985-04-05T23:59:59.000Z

10

Engineering Design and Safety Basis Inspection Criteria, Inspection...  

Broader source: Energy.gov (indexed) [DOE]

to this is our commitment to enhance our program. Therefore, we have developed the Engineering Design and Safety Basis Inspection Criteria, Inspection Activities, and Lines of...

11

Table 23. Coal Receipts at Coke Plants by Census Division  

U.S. Energy Information Administration (EIA) Indexed Site

Division (thousand short tons) U.S. Energy Information Administration | Quarterly Coal Report, April - June 2014 Table 23. Coal Receipts at Coke Plants by Census Division...

12

Apparatus for inspecting piping  

DOE Patents [OSTI]

An inspection rabbit for inspecting piping systems having severe bends therein. The rabbit consists of a flexible, modular body containing a miniaturized eddy current inspection probe, a self-contained power supply for proper operation of the rabbit, an outer surface that allows ease of movement through piping systems and means for transmitting data generated by the inspection device. The body is preferably made of flexible polyvinyl chloride (PVC) tubing or, alternatively, silicone rubber with a shrink wrapping of polytetrafluoroethylene (TEFLON.RTM.). The body is formed to contain the power supply, preferably a plurality of batteries, and a spool of communication wire that connects to a data processing computer external to the piping system.

Zollingger, W. Thor (Martinez, GA); Appel, D. Keith (Aiken, SC); Park, Larry R. (Raleigh, NC)

1995-01-01T23:59:59.000Z

13

Apparatus for inspecting piping  

DOE Patents [OSTI]

An inspection rabbit is described for inspecting piping systems having severe bends therein. The rabbit consists of a flexible, modular body containing a miniaturized eddy current inspection probe, a self-contained power supply for proper operation of the rabbit, an outer surface that allows ease of movement through piping systems and means for transmitting data generated by the inspection device. The body is preferably made of flexible polyvinyl chloride (PVC) tubing or, alternatively, silicone rubber with a shrink wrapping of polytetrafluoroethylene (TEFLON{trademark}). The body is formed to contain the power supply, preferably a plurality of batteries, and a spool of communication wire that connects to a data processing computer external to the piping system. 6 figures.

Zollingger, W.T.; Appel, D.K.; Park, L.R.

1995-03-21T23:59:59.000Z

14

Ten year RPV inspections experiences in a PWR in Spain: Improvements in the inner-radius inspection techniques  

SciTech Connect (OSTI)

The in-service inspection of an RPV, performed in accordance with the scope and requirements of Section 11 of the ASME Code at the end of the ten year interval, is one of the most complicated ISI activities carried out. Special resources and tools are required for successful performance of this type of inspection: (1) preparation and planning; (2) mechanical scanner; (3) data acquisition and analysis system; and (4) ultrasonic techniques. This paper describes the most relevant issues relating to RPV inspection, along with the experience obtained during the inspection of the RPV of a 930 MW Spanish PWR plant in 1992. Special attention is paid to the improvements achieved with respect to inspection of the inner-radius areas of the primary nozzles.

Gonzalez, E.; Willke, A. [Tecnatom, S.A., Madrid (Spain)

1994-12-31T23:59:59.000Z

15

Independent Oversight Inspection, Argonne National Laboratory...  

Broader source: Energy.gov (indexed) [DOE]

Inspection, Argonne National Laboratory, Volume 1 - May 2005 Independent Oversight Inspection, Argonne National Laboratory, Volume 1 - May 2005 May 2005 Inspection of Environment,...

16

Camera Inspection Arm for Boiling Water Reactors - 13330  

SciTech Connect (OSTI)

Boiling Water Reactor (BWR) outage maintenance tasks can be time-consuming and hazardous. Reactor facilities are continuously looking for quicker, safer, and more effective methods of performing routine inspection during these outages. In 2011, S.A. Technology (SAT) was approached by Energy Northwest to provide a remote system capable of increasing efficiencies related to Reactor Pressure Vessel (RPV) internal inspection activities. The specific intent of the system discussed was to inspect recirculation jet pumps in a manner that did not require manual tooling, and could be performed independently of other ongoing inspection activities. In 2012, SAT developed a compact, remote, camera inspection arm to create a safer, more efficient outage environment. This arm incorporates a compact and lightweight design along with the innovative use of bi-stable composite tubes to provide a six-degree of freedom inspection tool capable of reducing dose uptake, reducing crew size, and reducing the overall critical path for jet pump inspections. The prototype camera inspection arm unit is scheduled for final testing in early 2013 in preparation for the Columbia Generating Station refueling outage in the spring of 2013. (authors)

Martin, Scott; Rood, Marc [S.A. Technology, 3985 S. Lincoln Ave, Loveland, CO 80537 (United States)] [S.A. Technology, 3985 S. Lincoln Ave, Loveland, CO 80537 (United States)

2013-07-01T23:59:59.000Z

17

Implementation of automatic inspection system  

E-Print Network [OSTI]

Inspection is the formal examination of a product manufactured by any manufacturing process. Inspection process is critical to all the industries as it ensures that a good quality product reach at the end customers. In ...

Chawla, Yugank

2014-01-01T23:59:59.000Z

18

Flexible ultrasonic pipe inspection apparatus  

DOE Patents [OSTI]

Pipe crawlers, pipe inspection {open_quotes}rabbits{close_quotes} and similar vehicles are widely used for inspecting the interior surfaces of piping systems, storage tanks and process vessels for damaged or flawed structural features. This paper describes the design of a flexible, modular ultrasonic pipe inspection apparatus.

Jenkins, C.F.; Howard, B.D.

1994-01-01T23:59:59.000Z

19

TRANSPORTATION CASK RECEIPT/RETURN FACILITY CRITICALITY SAFETY EVALUATIONS  

SciTech Connect (OSTI)

The purpose of this design calculation is to demonstrate that the handling operations of transportation casks performed in the Transportation Cask Receipt and Return Facility (TCRRF) and Buffer Area meet the nuclear criticality safety design criteria specified in the ''Project Design Criteria (PDC) Document'' (BSC [Bechtel SAIC Company] 2004 [DIRS 171599], Section 4.9.2.2), and the functional nuclear criticality safety requirement described in the ''Transportation Cask Receipt/Return Facility Description Document'' (BSC 2004 [DIRS 170217], Section 3.2.3). Specific scope of work contained in this activity consists of the following items: (1) Evaluate criticality effects for both dry and fully flooded conditions pertaining to TCRRF and Buffer Area operations for defense in depth. (2) Evaluate Category 1 and 2 event sequences for the TCRRF as identified in the ''Categorization of Event Sequences for License Application'' (BSC 2004 [DIRS 167268], Section 7). This evaluation includes credible fuel reconfiguration conditions. In addition to the scope of work listed above, an evaluation was also performed of modeling assumptions for commercial spent nuclear fuel (CSNF) regarding inclusion of plenum and end regions of the active fuel. This calculation is limited to CSNF and US Department of Energy (DOE) SNF. it should be mentioned that the latter waste form is evaluated more in depth in the ''Canister Handling Facility Criticality Safety Calculations (BSC 2004 [DIRS 167614]). Further, the design and safety analyses of the naval SNF canisters are the responsibility of the US Department of the Navy (Naval Nuclear Propulsion Program) and will not be included in this document. In addition, this calculation is valid for the current design of the TCRRF and Buffer Area and may not reflect the ongoing design evolution of the facility. However, it is anticipated that design changes to the facility layout will have little or no impact on the criticality results and/or conclusions presented in this document. This calculation is subject to the ''Quality Assurance Requirements and Description'' (DOE 2004 [DIRS 171539]) because the TCRRF is included in the Q-List (BSC 2004 [DIRS 168361], p. A-3) as an item important to safety. This calculation is prepared in accordance with AP-3.12Q, ''Design Calculations and Analyses'' [DIRS 168413].

C.E. Sanders

2005-04-26T23:59:59.000Z

20

Inspection tester for explosives  

DOE Patents [OSTI]

An inspection tester that can be used anywhere as a primary screening tool by non-technical personnel to determine whether a surface contains explosives. It includes a body with a sample pad. First and second explosives detecting reagent holders and dispensers are operatively connected to the body and the sample pad. The first and second explosives detecting reagent holders and dispensers are positioned to deliver the explosives detecting reagents to the sample pad. A is heater operatively connected to the sample pad.

Haas, Jeffrey S. (San Ramon, CA); Simpson, Randall L. (Livermore, CA); Satcher, Joe H. (Patterson, CA)

2007-11-13T23:59:59.000Z

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Inspection tester for explosives  

DOE Patents [OSTI]

An inspection tester that can be used anywhere as a primary screening tool by non-technical personnel to determine whether a surface contains explosives. It includes a body with a sample pad. First and second explosives detecting reagent holders and dispensers are operatively connected to the body and the sample pad. The first and second explosives detecting reagent holders and dispensers are positioned to deliver the explosives detecting reagents to the sample pad. A is heater operatively connected to the sample pad.

Haas, Jeffrey S. (San Ramon, CA); Simpson, Randall L. (Livermore, CA); Satcher, Joe H. (Patterson, CA)

2010-10-05T23:59:59.000Z

22

Infrared microscope inspection apparatus  

DOE Patents [OSTI]

Apparatus and system for inspecting infrared transparents, such as an array of photovoltaic modules containing silicon solar cells, includes an infrared microscope, at least three sources of infrared light placed around and having their axes intersect the center of the object field and means for sending the reflected light through the microscope. The apparatus is adapted to be mounted on an X-Y translator positioned adjacent the object surface. 4 figs.

Forman, S.E.; Caunt, J.W.

1985-02-26T23:59:59.000Z

23

Infrared microscope inspection apparatus  

DOE Patents [OSTI]

Apparatus and system for inspecting infrared transparents, such as an array of photovoltaic modules containing silicon solar cells, includes an infrared microscope, at least three sources of infrared light placed around and having their axes intersect the center of the object field and means for sending the reflected light through the microscope. The apparatus is adapted to be mounted on an X-Y translator positioned adjacent the object surface.

Forman, Steven E. (Framingham, MA); Caunt, James W. (Concord, MA)

1985-02-26T23:59:59.000Z

24

An Empirical Study of Web-Based Inspection Meetings Filippo Lanubile  

E-Print Network [OSTI]

of preparation prior to the meeting, the main Proceedings of the 2003 International Symposium on Empirical of defects [5, 14]. Consequently, the main goal of the Inspection Meeting has been reduced from defect for a meeting of the whole inspection team has been debated among researchers and practitioners. Parnas

Lanubile, Filippo

25

PROCEDURE FOR OPENING PACKAGES CONTAINING RADIONUCLIDES Laboratory personnel should open and inspect packages immediately upon receipt.  

E-Print Network [OSTI]

as soon as possible to the vendor. Return of radioactive material to the vendor must be coordinated of absorbing material. 5. The inner packaging which includes the liner, shield, and absorbent materials may be contaminated; they are to be discarded in the radioactive waste container unless shown to be uncontaminated

Slatton, Clint

26

The WIPP journey to waste receipt  

SciTech Connect (OSTI)

In the early 1970s the federal government selected an area in southeastern New Mexico containing large underground salt beds as potentially suitable for radioactive waste disposal. An extensive site characterization program was initiated by the federal government. This site became the Waste Isolation Pilot Plant, better known as WIPP. It is now 1997, over two decades after the initial selection of the New Mexico site as a potential radioactive waste repository. Numerous scientific studies, construction activities, and environmental compliance documents have been completed. The US Department of Energy (DOE) has addressed all relevant issues regarding the safety of WIPP and its ability to isolate radioactive waste from the accessible environment. Throughout the last two decades up to the present time, DOE has negotiated through a political, regulatory, and legal maze with regard to WIPP. New regulations have been issued, litigation initiated, and public involvement brought to the forefront of the DOE decision-making process. All of these factors combined to bring WIPP to its present status--at the final stages of working through the licensing requirements for receipt of transuranic (TRU) waste for disposal. Throughout its history, the DOE has stayed true to Congress` mandates regarding WIPP. Steps taken have been necessary to demonstrate to Congress, the State of New Mexico, and the public in general, that the nation`s first radioactive waste repository will be safe and environmentally sound. DOE`s compliance demonstrations are presently under consideration by the cognizant regulatory agencies and DOE is closer than ever to waste receipt. This paper explores the DOE`s journey towards implementing a permanent disposal solution for defense-related TRU waste, including major Congressional mandates and other factors that contributed to program changes regarding the WIPP project.

Barnes, G.J.; Whatley, M.E.

1997-04-01T23:59:59.000Z

27

Gross Receipts Tax Exemption for Sales of Wind and Solar Systems to Government Entities  

Broader source: Energy.gov [DOE]

New Mexico has a gross receipts tax structure for businesses instead of a sales tax. Businesses are taxed on the gross amount of their business receipts each year before expenses are deducted. ...

28

Inspection Report: IG-0821  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report: IG-0717 January62049009

29

The SWAMI inspection robot: Fernald site requirements  

SciTech Connect (OSTI)

The purpose of this document is to introduce and describe the Stored Waste Autonomous Mobile Inspector (SWAMI) robot project and to identify issues that will need to be addressed prior to its field demonstration at Fernald in mid-1995. SWAMI is a mobile robotic vehicle that will perform mandated weekly inspections of waste containers. Fernald has a large inventory of these containers and a need to protect workers from radiation hazards while enhancing the efficiency and effectiveness of the inspections. Fernald`s role in this project is to supply the demonstration site and make all necessary preparations. This includes identification of the test areas and plans, and identification and compliance to Federal, State, DOE, and Site regulations on system safety and quality. In addition, Fernald will link SWAMI output images to off-line mass data storage, and also to an on-line ORACLE database. The authors shall initiate a dialog with State and Federal regulators towards the near term goal of acceptance of the SWAMI test plan and a longer term goal of acceptance of SWAMI as a supplement and improvement to present mandated RCRA inspections.

Hazen, F.B.

1993-09-28T23:59:59.000Z

30

LASER SAFETY SELF-INSPECTION CHECKLIST Lab Supervisor _________________________ Inspected By: __________________________  

E-Print Network [OSTI]

LASER SAFETY SELF-INSPECTION CHECKLIST Lab Supervisor _________________________ Inspected By, and alignment procedures kept with laser equipment? yes no 3. Have all commercially produced Class 3b and 4 lasers and all lasers made or modified on campus been registered with the University's Laser Safety

Bolch, Tobias

31

Ultrasonic inspection and deployment apparatus  

DOE Patents [OSTI]

An ultrasonic inspection apparatus for the inspection of metal structures, especially installed pipes. The apparatus combines a specimen inspection element, an acoustical velocity sensing element, and a surface profiling element, all in one scanning head. A scanning head bellows contains a volume of oil above the pipe surface, serving as acoustical couplant between the scanning head and the pipe. The scanning head is mounted on a scanning truck which is mobile around a circular track surrounding the pipe. The scanning truck has sufficient motors, gears, and position encoders to allow the scanning head six degrees of motion freedom. A computer system continually monitors acoustical velocity, and uses that parameter to process surface profiling and inspection data. The profiling data is used to automatically control scanning head position and alignment and to define a coordinate system used to identify and interpret inspection data. The apparatus is suitable for highly automated, remote application in hostile environments, particularly high temperature and radiation areas.

Michaels, Jennifer E. (Ithaca, NY); Michaels, Thomas E. (Ithaca, NY); Mech, Jr., Stephen J. (Pasco, WA)

1984-01-01T23:59:59.000Z

32

Device for inspecting vessel surfaces  

DOE Patents [OSTI]

A portable, remotely-controlled inspection crawler for use along the walls of tanks, vessels, piping and the like. The crawler can be configured to use a vacuum chamber for supporting itself on the inspected surface by suction or a plurality of magnetic wheels for moving the crawler along the inspected surface. The crawler is adapted to be equipped with an ultrasonic probe for mapping the structural integrity or other characteristics of the surface being inspected. Navigation of the crawler is achieved by triangulation techniques between a signal transmitter on the crawler and a pair of microphones attached to a fixed, remote location, such as the crawler's deployment unit. The necessary communications are established between the crawler and computers external to the inspection environment for position control and storage and/or monitoring of data acquisition.

Appel, D. Keith (Aiken, SC)

1995-01-01T23:59:59.000Z

33

Thermographic inspection of massive structures  

SciTech Connect (OSTI)

Nondestructive Evaluation of concrete structures is a growing concern for the nuclear industry as well as for many other industries. As critical concrete components continue to age, the ability to assess the health and suitability for continued service has become a key consideration. In some cases, repair of these structures is difficult and expensive, while replacement is prohibitively expensive or, in some cases, not feasible. Therefore, the ability to inspect these key assets is a primary concern, especially in the nuclear industry. Due to the large size of containment buildings, cooling towers, and other large concrete assets, the ability to rapidly inspect for defects of concern is very desirable. Thermographic inspection appears to have the required ability to rapidly inspect large structures to ascertain the location and size of many of the defects of concern. This ability was demonstrated by performing a thermographic inspection of a large concrete dam in 2 days.

Renshaw, Jeremy B.; Guimaraes, Maria; Scott, David B. [Electric Power Research Institute (EPRI), 3420 Hillview Avenue, Palo Alto, CA 94304 (United States)

2014-02-18T23:59:59.000Z

34

Reduced Mandated Inspection by Remote Field Eddy Current Inspection of Unpiggable Pipelines  

SciTech Connect (OSTI)

The Remote Field Eddy Current (RFEC) technique is ideal for inspecting unpiggable pipelines because all of its components can be made much smaller than the diameter of the pipe to be inspected. For this reason, RFEC was chosen as a technology for unpiggable pipeline inspections by DOE-NETL with the support of OTD and PRCI, to be integrated with platforms selected by DOENETL. As part of the project, the RFEC laboratory facilities were upgraded and data collection was made nearly autonomous. The resulting improved data collection speeds allowed GTI to test more variables to improve the performance of the combined RFEC and platform technologies. Tests were conducted on 6-, 8-, and 12-inch seamless and seam-welded pipes. Testing on the 6-inch pipes included using seven exciter coils, each of different geometry with an initial focus on preparing the technology for use on an autonomous robotic platform with limited battery capacity. Reductions in power consumption proved successful. Tests with metal components similar to the Explorer II modules were performed to check for interference with the electromagnetic fields. The results of these tests indicated RFEC would be able to produce quality inspections while on the robot. Mechanical constraints imposed by the platform, power requirements, control and communication protocols, and potential busses and connectors were addressed. Much work went into sensor module design including the mechanics and electronic diagrams and schematics. GTI participated in two Technology Demonstrations for inspection technologies held at Battelle Laboratories. GTI showed excellent detection and sizing abilities for natural corrosion. Following the demonstration, module building commenced but was stopped when funding reductions did not permit continued development for the selected robotic platform. Conference calls were held between GTI and its sponsors to resolve the issue of how to proceed with reduced funding. The project was rescoped for 10-16-inch pipes with the intent of looking at lower cost, easier to implement, tethered platform applications. OTD ended its sponsorship.

Albert Teitsma; Julie Maupin

2006-09-29T23:59:59.000Z

35

Independent Oversight Inspection, Office of Secure Transportation...  

Office of Environmental Management (EM)

Office of Secure Transportation - March 2007 Independent Oversight Inspection, Office of Secure Transportation - March 2007 March 2007 Inspection of Emergency Management at the...

36

Security enhanced with increased vehicle inspections  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Security enhanced with increased vehicle inspections Security measures increase as of March: vehicle inspections won't delay traffic New increased security procedures meet LANL's...

37

Independent Oversight Inspection of Environment, Safety, and...  

Broader source: Energy.gov (indexed) [DOE]

Inspection of Environment, Safety, and Health Programs at the Argonne National Laboratory, Technical Appendices, Volume II, May 2005 Independent Oversight Inspection of...

38

Independent Oversight Inspection, Argonne National Laboratory...  

Broader source: Energy.gov (indexed) [DOE]

Argonne National Laboratory - East, Summary Report - May 2002 Independent Oversight Inspection, Argonne National Laboratory - East, Summary Report - May 2002 May 2002 Inspection of...

39

Independent Oversight Inspection, Argonne National Laboratory...  

Broader source: Energy.gov (indexed) [DOE]

Inspection, Argonne National Laboratory-West - November 2004 Independent Oversight Inspection, Argonne National Laboratory-West - November 2004 November 2004 Emergency Management...

40

Independent Oversight Inspection of Environment, Safety, and...  

Broader source: Energy.gov (indexed) [DOE]

Inspection of Environment, Safety, and Health Programs at the Savannah River Operations Office and Savannah River Site, January 2010 Independent Oversight Inspection of...

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Independent Oversight Inspection, Oak Ridge National Laboratory...  

Broader source: Energy.gov (indexed) [DOE]

5 Independent Oversight Inspection, Oak Ridge National Laboratory - October 2005 October 2005 Inspection of Emergency Management at the Oak Ridge Office and the Oak Ridge National...

42

Independent Oversight Inspection, Oak Ridge National Laboratory...  

Energy Savers [EERE]

Oak Ridge National Laboratory - October 2008 Independent Oversight Inspection, Oak Ridge National Laboratory - October 2008 October 2008 Inspection of Emergency Management at the...

43

Independent Oversight Inspection, Oak Ridge National Laboratory...  

Broader source: Energy.gov (indexed) [DOE]

Oak Ridge National Laboratory - October 2008 Independent Oversight Inspection, Oak Ridge National Laboratory - October 2008 October 2008 Inspection of Nuclear Safety at the Oak...

44

Independent Oversight Inspection, Waste Isolation Pilot Plant...  

Energy Savers [EERE]

Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report - August 2002 Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report - August...

45

Visual inspection for CTBT verification  

SciTech Connect (OSTI)

On-site visual inspection will play an essential role in future Comprehensive Test Ban Treaty (CTBT) verification. Although seismic and remote sensing techniques are the best understood and most developed methods for detection of evasive testing of nuclear weapons, visual inspection can greatly augment the certainty and detail of understanding provided by these more traditional methods. Not only can visual inspection offer ``ground truth`` in cases of suspected nuclear testing, but it also can provide accurate source location and testing media properties necessary for detailed analysis of seismic records. For testing in violation of the CTBT, an offending party may attempt to conceal the test, which most likely will be achieved by underground burial. While such concealment may not prevent seismic detection, evidence of test deployment, location, and yield can be disguised. In this light, if a suspicious event is detected by seismic or other remote methods, visual inspection of the event area is necessary to document any evidence that might support a claim of nuclear testing and provide data needed to further interpret seismic records and guide further investigations. However, the methods for visual inspection are not widely known nor appreciated, and experience is presently limited. Visual inspection can be achieved by simple, non-intrusive means, primarily geological in nature, and it is the purpose of this report to describe the considerations, procedures, and equipment required to field such an inspection.

Hawkins, W.; Wohletz, K.

1997-03-01T23:59:59.000Z

46

Uncertainty Budget Analysis for Dimensional Inspection Processes (U)  

SciTech Connect (OSTI)

This paper is intended to provide guidance and describe how to prepare an uncertainty analysis of a dimensional inspection process through the utilization of an uncertainty budget analysis. The uncertainty analysis is stated in the same methodology as that of the ISO GUM standard for calibration and testing. There is a specific distinction between how Type A and Type B uncertainty analysis is used in a general and specific process. All theory and applications are utilized to represent both a generalized approach to estimating measurement uncertainty and how to report and present these estimations for dimensional measurements in a dimensional inspection process. The analysis of this uncertainty budget shows that a well-controlled dimensional inspection process produces a conservative process uncertainty, which can be attributed to the necessary assumptions in place for best possible results.

Valdez, Lucas M. [Los Alamos National Laboratory

2012-07-26T23:59:59.000Z

47

F Reactor Inspection  

SciTech Connect (OSTI)

Workers from Mission Support Alliance, LLC., removed the welds around the steel door of the F Reactor before stepping inside the reactor to complete its periodic inspection. This is the first time the Department of Energy (DOE) has had the reactor open since 2008. The F Reactor is one of nine reactors along the Columbia River at the Department's Hanford Site in southeastern Washington State, where environmental cleanup has been ongoing since 1989. As part of the Tri-Party Agreement, the Department completes surveillance and maintenance activities of cocooned reactors periodically to evaluate the structural integrity of the safe storage enclosure and to ensure confinement of any remaining hazardous materials. "This entry marks a transition of sorts because the Hanford Long-Term Stewardship Program, for the first time, was responsible for conducting the entry and surveillance and maintenance activities," said Keith Grindstaff, Energy Department Long-Term Stewardship Program Manager. "As the River Corridor cleanup work is completed and transitioned to long-term stewardship, our program will manage any on-going requirements."

Grindstaff, Keith; Hathaway, Boyd; Wilson, Mike

2014-10-29T23:59:59.000Z

48

F Reactor Inspection  

ScienceCinema (OSTI)

Workers from Mission Support Alliance, LLC., removed the welds around the steel door of the F Reactor before stepping inside the reactor to complete its periodic inspection. This is the first time the Department of Energy (DOE) has had the reactor open since 2008. The F Reactor is one of nine reactors along the Columbia River at the Department's Hanford Site in southeastern Washington State, where environmental cleanup has been ongoing since 1989. As part of the Tri-Party Agreement, the Department completes surveillance and maintenance activities of cocooned reactors periodically to evaluate the structural integrity of the safe storage enclosure and to ensure confinement of any remaining hazardous materials. "This entry marks a transition of sorts because the Hanford Long-Term Stewardship Program, for the first time, was responsible for conducting the entry and surveillance and maintenance activities," said Keith Grindstaff, Energy Department Long-Term Stewardship Program Manager. "As the River Corridor cleanup work is completed and transitioned to long-term stewardship, our program will manage any on-going requirements."

Grindstaff, Keith; Hathaway, Boyd; Wilson, Mike

2014-11-24T23:59:59.000Z

49

Solar Permitting & Inspection Webinar Series  

Office of Energy Efficiency and Renewable Energy (EERE)

ICLEI Local Governments for Sustainability U.S.A. and the Interstate Renewable Energy Council, Inc. (IREC) present a series of three webinars on Solar Permitting & Inspection. As part of the U...

50

Inspect and Repair Steam Traps  

SciTech Connect (OSTI)

This revised ITP tip sheet on inspecting and repairing steam traps provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

51

Proceedings: EPRI Second Phased Array Inspection Seminar  

SciTech Connect (OSTI)

The Second EPRI Phased Array Inspection Seminar focused on industrial applications of phased array technology that have been achieved to date or are planned for the near future. Presentations were made by developers of inspection techniques, inspection services vendors, and utility personnel who have performed inspections using arrays.

None

2001-11-01T23:59:59.000Z

52

Grantee Checklist for the Inspection & Monitoring Requirement  

Broader source: Energy.gov [DOE]

This document walks Grantees through the Inspection & Monitoring requirement of the Quality Work Plan.

53

Allocation of inspection resources for international safeguards  

SciTech Connect (OSTI)

Increasing numbers and complexity of facilities inspected by the International Atomic Energy Agency will require difficult decisions about the levels of safeguards to be assigned to materials and facilities should limitations on inspection resources continue. This paper examines some alternative strategies for assigning inspection effort that could improve effectiveness and efficiency of safeguards compared with current inspection practice. These allocation concepts are: (1) extension of inspection planning to include material strata and accounting areas that encompass multiple facilities and (2) the use of randomization of the quality and frequency of inspections and inspection activities.

Markin, J.T.

1987-01-01T23:59:59.000Z

54

Acceptance inspection plan 105KW Facility modifications for fuel retrieval subproject  

SciTech Connect (OSTI)

The acceptance inspection of construction by Fluor Daniel Hanford (FDH) is performed to provide assurance that fabrication, construction, and installation are in accordance with approved contract documents. Approved contract documents used to perform inspections may include specifications, drawings, and contractor submittals such as fabrication drawings, procedures, etc. The amount or degree of inspection activity is tailored to the project as determined by the project team so that the effort and cost expended are commensurate with the importance of the facility in terms of function and safety. Inspections are documented to provide verification of the acceptability of the work performed. This document identifies the inspections and documentation forms to be provided. It is prepared and implemented with the understanding that the construction contractor is fully responsible for compliance with contract documents and for the quality of.work performed. Inspections performed are in accordance with approved procedures. The Manager of Acceptance Inspection is responsible for the implementation of this plan and assignment of personnel for the work. Inspections are conducted by personnel who are qualified and certified to perform their assigned task. The Acceptance Inspection Plan is organized in the Construction Specification Institute (CSI) format to cross reference design specification sections with sections of the AI Plan. In each AI Plan section the applicable specification section subject will be identified followed by the appropriate inspection requirements. General surveillances will be listed when applicable. Acceptance Inspection Reports are provided to document inspections not documented on a test report (i.e., Soil Test Data, Concrete Test Report, NDE/Weld Record, Leak/Pressure Test Certification, Backflow Device Test Report, Nonconformance Report, Deficiency Report, and/or Contractors testing forms).

Shen, E.J.

1998-01-09T23:59:59.000Z

55

Acceptance inspection plan 105KE Facility modifications for fuel retrieval subproject  

SciTech Connect (OSTI)

The acceptance inspection of construction by Fluor Daniel Hanford (FDH) is performed to provide assurance that fabrication, construction, and installation are in accordance with approved contract documents. Approved contract documents used to perform inspections may include specifications, drawings, and contractor submittals such as fabrication drawings, procedures, etc. The amount or degree of inspection activity is tailored to the project as determined by the project team so that the effort and cost expended are commensurate with the importance of the facility in terms of function and safety. Inspections are documented to provide verification of the acceptability of the work performed. This document identifies the inspections and documentation forms to be provided. It is prepared and implemented with the understanding that the construction contractor is fully responsible for compliance with contract documents and for the quality of work performed. Inspections performed are in accordance with approved procedures. The Manager of Acceptance Inspection is responsible for the implementation of this plan and assignment of personnel for the work. Inspections are conducted by personnel who are qualified and certified, to perform their assigned task. The Acceptance Inspection Plan is organized in the Construction Specification Institute (CSI) format to cross reference design specification sections with sections of the AI Plan. In each AI Plan section the applicable specification section subject will be identified followed by the appropriate inspection requirements. General surveillances will be listed when applicable. Acceptance Inspection Reports are provided to document inspections not documented on a test report (i.e., Soil Test Data, Concrete Test Report, NDE/Weld Record, Leak/Pressure Test Certification, Backflow Device Test Report, Nonconformance Report, Deficiency Report, and/or Contractors testing forms).

Shen, E.J.

1998-01-09T23:59:59.000Z

56

&leased on receipt k&>.ntsnded f o r use  

E-Print Network [OSTI]

&leased on receipt k&>.ntsnded f o r use $Qtoaber 11, 1926 Mailed Scpteribcr 4,1926 By Dr. Charlss&ing placo from ono portion of a mek t o the next. Prof. R. DOC. hraediate solar control vas dominant. True

57

Science Serv.ice Feature Released upn receipt  

E-Print Network [OSTI]

Science Serv.ice Feature Released upn receipt but intended for use March 28, 1933 'i 'IJI.IY TKE m estiraating the t o t a l number of lightning flashes, since whiibe som thunderstorms produce only a fern discharges of lightnhg - Say one t o a dozen - there are others that produce thousands. B i s is In one Npine

58

ROBOTIC TANK INSPECTION END EFFECTOR  

SciTech Connect (OSTI)

The objective of this contract between Oceaneering Space Systems (OSS) and the Department of Energy (DOE) was to provide a tool for the DOE to inspect the inside tank walls of underground radioactive waste storage tanks in their tank farms. Some of these tanks are suspected to have leaks, but the harsh nature of the environment within the tanks precludes human inspection of tank walls. As a result of these conditions only a few inspection methods can fulfill this task. Of the methods available, OSS chose to pursue Alternating Current Field Measurement (ACFM), because it does not require clean surfaces for inspection, nor any contact with the Surface being inspected, and introduces no extra by-products in the inspection process (no coupling fluids or residues are left behind). The tool produced by OSS is the Robotic Tank Inspection End Effector (RTIEE), which is initially deployed on the tip of the Light Duty Utility Arm (LDUA). The RTEE combines ACFM with a color video camera for both electromagnetic and visual inspection The complete package consists of an end effector, its corresponding electronics and software, and a user's manual to guide the operator through an inspection. The system has both coarse and fine inspection modes and allows the user to catalog defects and suspected areas of leakage in a database for further examination, which may lead to emptying the tank for repair, decommissioning, etc.. The following is an updated report to OSS document OSS-21100-7002, which was submitted in 1995. During the course of the contract, two related subtasks arose, the Wall and Coating Thickness Sensor and the Vacuum Scarifying and Sampling Tool Assembly. The first of these subtasks was intended to evaluate the corrosion and wall thinning of 55-gallon steel drums. The second was retrieved and characterized the waste material trapped inside the annulus region of the underground tanks on the DOE's tank farms. While these subtasks were derived from the original intent of the contract, the focus remains on the RTIEE.

Rachel Landry

1999-10-01T23:59:59.000Z

59

Evaluation of inservice inspection examinatiions  

SciTech Connect (OSTI)

In order to evaluate the effectiveness of Section 11, Division 1, ``Rules for Inservice Inspection of Nuclear Power Plant Components,`` of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code examinations, 26 inservice inspection (ISI) summary reports from 24 facilities were reviewed. It was found that these ASME Code examinations and tests are instrumental in revealing indications and defects in welds and plant components. In addition, this study uncovered that fact that some of the Section 11 requirements are apparently not clear and are misunderstood by some of the facilities. Also, the need for more stringent requirements was evaluated and some Code changes are recommended.

Aldrich, D.A.; Cook, J.F.

1990-05-01T23:59:59.000Z

60

Evaluation of inservice inspection examinatiions  

SciTech Connect (OSTI)

In order to evaluate the effectiveness of Section 11, Division 1, Rules for Inservice Inspection of Nuclear Power Plant Components,'' of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code examinations, 26 inservice inspection (ISI) summary reports from 24 facilities were reviewed. It was found that these ASME Code examinations and tests are instrumental in revealing indications and defects in welds and plant components. In addition, this study uncovered that fact that some of the Section 11 requirements are apparently not clear and are misunderstood by some of the facilities. Also, the need for more stringent requirements was evaluated and some Code changes are recommended.

Aldrich, D.A.; Cook, J.F.

1990-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Piping inspection carriage having axially displaceable sensor  

DOE Patents [OSTI]

A pipe inspection instrument carriage for use with a pipe crawler for performing internal inspections of piping surfaces. The carriage has a front leg assembly, a rear leg assembly and a central support connecting the two assemblies and for mounting an instrument arm having inspection instruments. The instrument arm has a y-arm mounted distally thereon for axially aligning the inspection instrumentation and a mounting block, a linear actuator and axial movement arm for extending the inspection instruments radially outward to operably position the inspection instruments on the piping interior. Also, the carriage has a rotation motor and gear assembly for rotating the central support and the front leg assembly with respect to the rear leg assembly so that the inspection instruments azimuthally scan the piping interior. The instrument carriage allows performance of all piping inspection operations with a minimum of moving parts, thus decreasing the likelihood of performance failure.

Zollinger, William T. (Martinez, GA); Treanor, Richard C. (Augusta, GA)

1994-01-01T23:59:59.000Z

62

Piping inspection carriage having axially displaceable sensor  

DOE Patents [OSTI]

A pipe inspection instrument carriage is described for use with a pipe crawler for performing internal inspections of piping surfaces. The carriage has a front leg assembly, a rear leg assembly and a central support connecting the two assemblies and for mounting an instrument arm having inspection instruments. The instrument arm has a Y-arm mounted distally thereon for axially aligning the inspection instrumentation and a mounting block, a linear actuator and axial movement arm for extending the inspection instruments radially outward to operably position the inspection instruments on the piping interior. Also, the carriage has a rotation motor and gear assembly for rotating the central support and the front leg assembly with respect to the rear leg assembly so that the inspection instruments azimuthally scan the piping interior. The instrument carriage allows performance of all piping inspection operations with a minimum of moving parts, thus decreasing the likelihood of performance failure. 4 figures.

Zollinger, W.T.; Treanor, R.C.

1994-12-06T23:59:59.000Z

63

On-Site Disposal Facility Inspection Report  

Office of Legacy Management (LM)

982011 September 2011 point- specific IC inspection na 1304 East Cell 2, 6:1 No Johnson grass 9132011 September 2011 OSDF Inspection BL1 Herbicide applied June-13 1305...

64

Robotic Welding and Inspection System  

SciTech Connect (OSTI)

This paper presents a robotic system for GTA welding of lids on cylindrical vessels. The system consists of an articulated robot arm, a rotating positioner, end effectors for welding, grinding, ultrasonic and eddy current inspection. Features include weld viewing cameras, modular software, and text-based procedural files for process and motion trajectories.

H. B. Smartt; D. P. Pace; E. D. Larsen; T. R. McJunkin; C. I. Nichol; D. E. Clark; K. L. Skinner; M. L. Clark; T. G. Kaser; C. R. Tolle

2008-06-01T23:59:59.000Z

65

BUILDING INSPECTION Building, Infrastructure, Transportation  

E-Print Network [OSTI]

BUILDING INSPECTION Building, Infrastructure, Transportation City of Redwood City 1017 Middlefield Sacramento, Ca 95814-5514 Re: Green Building Ordinance and the Building Energy Efficiency Standards Per of Redwood City enforce the current Title 24 Building Energy Efficiency Standards as part

66

Sandia National Laboratories: Permitting, Inspection, and Interconnect...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tagged with: Energy * Inspecting * Interconnection * Permitting * photovoltaic * Photovoltaics * PV * Renewable Energy * solar * Solar Energy * Solar Market Transformation *...

67

Independent Oversight Inspection, Hanford Site- September 2006  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety, and Health and Emergency Management Programs at the Hanford Site Waste Stabilization and Disposition Project

68

Efficient Bayesian sampling inspection for industrial processes  

E-Print Network [OSTI]

of complex industrial systems subject to degradation effects, such as corrosion, is important for safety and how much inspection should be made in the future. Key words Spatio-temporal, DLM, corrosion of complex systems may be inspected each week at a single oil re- fining plant. Many inspection methods

Little, John

69

Visual inspection submersible for nuclear power plant  

SciTech Connect (OSTI)

Remotely Operated Vehicles (ROV) are currently in use for visual inspections within reactor pressure vessels (RPV). In boiling water reactors (BWR), there is a complex RPV consisting of structures which are not disassembled during outages. To inspect the large volume of the RPV and associated components, the inspection vehicle must be compact and easily maneuverable. Toshiba has developed an ROV for the purpose of visual inspections in BWRS. This paper describes this ROV, the most compact visual inspection submersible yet manufactured and used in a BWR.

Kimura, M.; Okano, H.; Ozaki, O.; Shimada, H. [Toshiba Corp., Yokohama (Japan)

1995-08-01T23:59:59.000Z

70

Delivery Reliability for Natural Gas--Inspection Technologies  

SciTech Connect (OSTI)

The Remote Field Eddy Current (RFEC) technique is ideal for inspecting unpiggable pipelines because all of its components can be made smaller than the diameter of the pipe to be inspected. For these reasons, RFEC was selected as a technology to be integrated with the Explorer II robotic platform for unpiggable pipeline inspections. The research work is a continuation of a prior DOE-NETL project but is now directed towards a seamless integration with the robot. The laboratory set-up has been improved and data collection is nearly autonomous. With the improved collections speeds, GTI has been able to test more variables. Tests have been run on 6-inch and 12-inch seamless and seam-welded pipes. Testing on the 6-inch pipes have included using five exciter coils, each of a different geometry. Two types of sensor coils have been tested. With a focus on preparing the technology for use on the Explorer II, improvements in power consumption have proved successful. Tests with metal components have been performed to check for interference with the electromagnetic field. The results of these tests indicate RFEC will produce quality inspections while on the robot. GTI has also been testing manufactured detection boards currently used for boiler tube inspections. These boards are appropriately compact for use on the Explorer II robot and are able to detect defects at the speed of robot travel. In addition to advanced sensor development, GTI has participated in sensor/platform definition and module design activities. Mechanical constraints, power requirements, limited control and communication protocols, and potential busses and connectors have been addressed. GTI has conducted a proper design process to produce a sound design for the RFEC components to fit into two modules. The remaining work to be performed in the design of the sensor module is packaging and strengthening.

Albert Teitsma; Julie Maupin

2005-10-01T23:59:59.000Z

71

Apparatus for inspecting fuel elements  

DOE Patents [OSTI]

This disclosure describes an alpha monitor usable in an automated nuclear fuel pin loading and processing unit. Fuel pins or other elongated pins are fed laterally into the alpha monitor in a singular fashion and are translated by a first roller assembly into a weld flare machining and decontamination substation not forming a part of the invention. Pins return and are lifted upwardly and transferred across to a combined pin lifting and electrode operating means which lifts the pins upwardly into a clamshell electrode assembly which is spread open by a combined pin lifting and electrode operating means. Once inserted the clamshell type electrode arrangement closes around the fuel pins so that inspection can occur. Fuel pins are inspected by charging electrodes to a negative potential and measuring the change in charge occurring when positively charged alpha particles strike the negatively charged electrodes. After inspection, the fuel pins are lowered by the pin lifting and electrode operating means into a second roller assembly which longitudinally conveys approved pins from the airtight enclosure in which the alpha monitor is mounted. If the fuel pins are rejected then they are moved laterally by a second transfer means and onto another system for further processing.

Kaiser, B.J.; Oakley, D.J.; Groves, O.J.

1984-12-21T23:59:59.000Z

72

Inspection effectiveness and risk in process industries  

SciTech Connect (OSTI)

Failures occasionally occur in refinery and petrochemical process equipment due to in-service damage such as internal corrosion, external corrosion, or stress corrosion cracking. Many of these failures should be preventable by detection of the damage prior to failure. However, selection of an inspection method for detection of damage has not always been based upon an evaluation of the required inspection effectiveness. Resources can be wasted by using an inspection method that is incapable of detecting damage, or is so unlikely to detect damage that it may be considered to be ineffective. Another waste of resources is excessive inspection, where the amount of inspection effort is not matched to the benefit. This paper outlines an approach to quantify the effectiveness of the complete inspection method, here defined as all of the elements that determine the mechanical integrity of an equipment item. This paper demonstrates the use of simple statistical tools or experimental techniques for estimating the effectiveness of an inspection method, and using this estimate in a risk evaluation. The approach is used to update the estimated severity of damage in process equipment after an inspection has been performed. The result of the analysis can be used in a risk assessment to estimate the risk associated with equipment failure before and after an inspection, thus providing a powerful tool to realistically set priorities for inspection planning.

Conley, M.J.; Tallin, A.G. [DNV, Houston, TX (United States)

1996-12-01T23:59:59.000Z

73

ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM - 2011  

SciTech Connect (OSTI)

Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2011 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2011 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per SRR-LWE-2011-00026, HLW Tank Farm Inspection Plan for 2011, were completed. Ultrasonic measurements (UT) performed in 2011 met the requirements of C-ESR-G-00006, In-Service Inspection Program for High Level Waste Tanks, Rev. 3, and WSRC-TR-2002-00061, Rev.6. UT inspections were performed on Tanks 25, 26 and 34 and the findings are documented in SRNL-STI-2011-00495, Tank Inspection NDE Results for Fiscal Year 2011, Waste Tanks 25, 26, 34 and 41. A total of 5813 photographs were made and 835 visual and video inspections were performed during 2011. A potential leaksite was discovered at Tank 4 during routine annual inspections performed in 2011. The new crack, which is above the allowable fill level, resulted in no release to the environment or tank annulus. The location of the crack is documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.6.

West, B.; Waltz, R.

2012-06-21T23:59:59.000Z

74

Vermont Natural Gas Imports (No intransit Receipts) (Million Cubic Feet)  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteamYearTexas--StateWinterYear JanWellhead PriceDay)(No intransit Receipts)

75

System for inspection of stacked cargo containers  

DOE Patents [OSTI]

The present invention relates to a system for inspection of stacked cargo containers. One embodiment of the invention generally comprises a plurality of stacked cargo containers arranged in rows or tiers, each container having a top, a bottom a first side, a second side, a front end, and a back end; a plurality of spacers arranged in rows or tiers; one or more mobile inspection devices for inspecting the cargo containers, wherein the one or more inspection devices are removeably disposed within the spacers, the inspection means configured to move through the spacers to detect radiation within the containers. The invented system can also be configured to inspect the cargo containers for a variety of other potentially hazardous materials including but not limited to explosive and chemical threats.

Derenzo, Stephen (Pinole, CA)

2011-08-16T23:59:59.000Z

76

2003 Annual Inspection of the  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545 OCTTO:March_ ,'I- i. : 'Annual Inspection

77

2003 Annual Inspection of the  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545 OCTTO:March_ ,'I- i. : 'AnnualInspection

78

2006 Annual Inspection for the  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C. 20545 OCTTO:March_ ,'I- i. : 'AnnualInspection3

79

Independent Oversight Inspection, Sandia National Laboratories...  

Office of Environmental Management (EM)

National Laboratories, Summary Report - February 2003 February 2003 Inspection of Environment, Safety, and Health and Emergency Management at the Sandia National Laboratories...

80

Criticality Safety Controls Implementation Inspection Criteria...  

Broader source: Energy.gov (indexed) [DOE]

Criticality Safety Controls Implementation Inspection Criteria, Approach, and Lines of Inquiry, October 23, 2009, (HSS CRAD 64-18, Rev 0 ) Criticality Safety Controls...

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Independent Oversight Inspection, Nevada Test Site - September...  

Broader source: Energy.gov (indexed) [DOE]

Site - September 2004 Independent Oversight Inspection, Nevada Test Site - September 2004 September 2004 Security and Emergency Management Pilot Integrated Performance Tests at the...

82

Enduring Stockpile CMM Shell Inspection Plan (U)  

SciTech Connect (OSTI)

The slides are intended to serve as a high level summary of the CMM Shell Inspection Plan as presented to Pu Sustainment Legacy Pit Production IPT.

Montano, Joshua D. [Los Alamos National Laboratory; Flores, Randy A. [Los Alamos National Laboratory

2012-06-13T23:59:59.000Z

83

Electrical Equipment Inventory and Inspection Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electrical Equipment Inventory and Inspection Information APS Non-NRTL Electrical Equipment Inventory Spreadsheet ANL Recognized Reputable Electrical Equipment Manufacturer List as...

84

Pipeline inspection using an autonomous underwater vehicle  

SciTech Connect (OSTI)

Pipeline inspection can be carried out by means of small Autonomous Underwater Vehicles (AUVs), operating either with a control link to a surface vessel, or totally independently. The AUV offers an attractive alternative to conventional inspection methods where Remotely Operated Vehicles (ROVs) or paravanes are used. A flatfish type AUV ``MARTIN`` (Marine Tool for Inspection) has been developed for this purpose. The paper describes the proposed types of inspection jobs to be carried out by ``MARTIN``. The design and construction of the vessel, its hydrodynamic properties, its propulsion and control systems are discussed. The pipeline tracking and survey systems, as well as the launch and recovery systems are described.

Egeskov, P.; Bech, M. [Maridan Aps., Hoersholm (Denmark); Bowley, R. [TSS Ltd., Weston-on-the-Green (United Kingdom); Aage, C. [Technical Univ. of Denmark, Lyngby (Denmark). Dept. of Ocean Engineering

1995-12-31T23:59:59.000Z

85

Annual radioactive waste tank inspection program - 1996  

SciTech Connect (OSTI)

Aqueous radioactive wastes from Savannah River Site (SRS) separations processes are contained in large underground carbon steel tanks. Inspections made during 1996 to evaluate these vessels, and evaluations based on data accrued by inspections performed since the tanks were constructed, are the subject of this report.

McNatt, F.G.

1997-04-01T23:59:59.000Z

86

Annual Radioactive Waste Tank Inspection Program - 1998  

SciTech Connect (OSTI)

Aqueous radioactive wastes from Savannah River Site separations processes are contained in large underground carbon steel tanks. Inspections made during 1998 to evaluate these vessels and auxiliary appurtenances, along with evaluations based on data accrued by inspections performed since the tanks were constructed, are the subject of this report.

McNatt, F.G.

1999-10-27T23:59:59.000Z

87

Annual radioactive waste tank inspection program - 1999  

SciTech Connect (OSTI)

Aqueous radioactive wastes from Savannah River Site (SRS) separations processes are contained in large underground carbon steel tanks. Inspections made during 1999 to evaluate these vessels and auxiliary appurtenances along with evaluations based on data accrued by inspections performed since the tanks were constructed are the subject of this report.

Moore, C.J.

2000-04-14T23:59:59.000Z

88

Electrical Equipment Inspection Program Electrical Safety  

E-Print Network [OSTI]

Electrical Equipment Inspection Program Electrical Safety SLAC-I-730-0A11A-001-R003 23 March 2005 Document Title: Electrical Equipment Inspection Program Original Publication Date: 19 January 2005 Revised Publication Date: 23 March 2005 (updated 29 November 2010) Department: Electrical Safety Document Number: SLAC

Wechsler, Risa H.

89

Above Ground Storage Tank (AST) Inspection Form  

E-Print Network [OSTI]

Above Ground Storage Tank (AST) Inspection Form Petroleum Bulk Storage Form Facility Name: ______________________ Tank No:_______________ Date:_____________ Inspection Parameter Result Comments/Corrective Actions 1. Is there leaking in the interstitial space (not DRY)? YES/NO/NA 2. Tank surface shows signs of leakage? YES/NO/NA 3

Pawlowski, Wojtek

90

30 TAC, part 1, chapter 39, rule 39.418 Notice of Receipt of...  

Open Energy Info (EERE)

Notice of Receipt of Application and Intent to Obtain Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: 30 TAC, part...

91

Cornell University's Online Aboveground Petroleum Tank Inspection Program  

E-Print Network [OSTI]

Cornell University's Online Aboveground Petroleum Tank Inspection Program How To's What is Cornell University's Online Aboveground Petroleum Tank Inspection Program? Cornell University's Online Aboveground Petroleum Tank Inspection Program enables assigned tank inspectors to record their monthly aboveground tank

Pawlowski, Wojtek

92

ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM 2009  

SciTech Connect (OSTI)

Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2009 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2009 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per LWO-LWE-2008-00423, HLW Tank Farm Inspection Plan for 2009, were completed. All Ultrasonic measurements (UT) performed in 2009 met the requirements of C-ESG-00006, In-Service Inspection Program for High Level Waste Tanks, Rev. 1, and WSRC-TR-2002-00061, Rev.4. UT inspections were performed on Tank 29 and the findings are documented in SRNL-STI-2009-00559, Tank Inspection NDE Results for Fiscal Year 2009, Waste Tank 29. Post chemical cleaning UT measurements were made in Tank 6 and the results are documented in SRNL-STI-2009-00560, Tank Inspection NDE Results Tank 6, Including Summary of Waste Removal Support Activities in Tanks 5 and 6. A total of 6669 photographs were made and 1276 visual and video inspections were performed during 2009. Twenty-Two new leaksites were identified in 2009. The locations of these leaksites are documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.4. Fifteen leaksites at Tank 5 were documented during tank wall/annulus cleaning activities. Five leaksites at Tank 6 were documented during tank wall/annulus cleaning activities. Two new leaksites were identified at Tank 19 during waste removal activities. Previously documented leaksites were reactivated at Tanks 5 and 12 during waste removal activities. Also, a very small amount of additional leakage from a previously identified leaksite at Tank 14 was observed.

West, B.; Waltz, R.

2010-06-21T23:59:59.000Z

93

Flexible ultrasonic pipe inspection apparatus  

DOE Patents [OSTI]

A flexible, modular ultrasonic pipe inspection apparatus, comprising a flexible, hollow shaft that carries a plurality of modules, including at least one rotatable ultrasonic transducer, a motor/gear unit, and a position/signal encoder. The modules are connected by flexible knuckle joints that allow each module of the apparatus to change its relative orientation with respect to a neighboring module, while the shaft protects electrical wiring from kinking or buckling while the apparatus moves around a tight corner. The apparatus is moved through a pipe by any suitable means, including a tether or drawstring attached to the nose or tail, differential hydraulic pressure, or a pipe pig. The rotational speed of the ultrasonic transducer and the forward velocity of the apparatus are coordinated so that the beam sweeps out the entire interior surface of the pipe, enabling the operator to accurately assess the condition of the pipe wall and determine whether or not leak-prone corrosion damage is present.

Jenkins, Charles F. (Aiken, SC); Howard, Boyd D. (Augusta, GA)

1998-01-01T23:59:59.000Z

94

Mobile inspection and repackaging unit  

SciTech Connect (OSTI)

Storage of large volumes of radioactive mixed waste (RMW) generated over the past 20 years at the Hanford Site has resulted in various waste management challenges. Presently, disposal capacity for RMW does not exist. Containers holding RMW will be stored until processing facilities can be completed to provide treatment and final disposal. Because of the complexity of these wastes, special projects have been initiated to properly manage them. This paper addresses one such project. The goal of this project is to develop a mobile inspection and repackaging unit (IRU) for solid RMW. The paper describes the structural design, equipment, ventilation system, instruments and electrical systems, video monitors and recorders, materials handling, and waste processing of containers.

Whitney, G.A.; Roberts, R.J. [Westinghouse Hanford Co., Richland, WA (United States). Solid Waste Disposal Div.

1993-12-31T23:59:59.000Z

95

Introduction Preparation  

E-Print Network [OSTI]

Introduction Motivation Preparation Notos' Components Results Conclusions and Future Work Building Problem Description and Motivation Preparation Notation, Passive DNS trends and Anchor Classes Notos Reputation Results Conclusions and Future Work Special thanks to: Damballa Passive DNS data, Malware and BL

96

Reliability Tools for Resonance Inspection of Light Metal Castings...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Reliability Tools for Resonance Inspection of Light Metal Castings Reliability Tools for Resonance Inspection of Light Metal Castings 2012 DOE Hydrogen and Fuel Cells Program and...

97

UF{sub 6} cylinder inspections at PGDP  

SciTech Connect (OSTI)

Routine inspections of all UF{sub 6} cylinders at the Paducah Gaseous Diffusion Plant have been mandated by the Department of Energy. A specific UF{sub 6} cylinder inspection procedure for what items to inspect and training for the operators prior to inspection duty are described. The layout of the cylinder yards and the forms used in the inspections are shown. The large number of cylinders (>30,000) to inspect and the schedule for completion on the mandated time table are discussed. Results of the inspections and the actions to correct the deficiencies are explained. Future inspections and movement of cylinders for relocation of certain cylinder yards are defined.

Lamb, G.W.; Whinnery, W.N. [Martin Marietta Energy Systems, Inc., Paducah, KY (United States)

1991-12-31T23:59:59.000Z

98

Inspection of Emergency Management Programs at the Argonne National...  

Broader source: Energy.gov (indexed) [DOE]

Inspection of Emergency Management Programs at the Argonne National Laboratory - East, Volume II, May 2002 Inspection of Emergency Management Programs at the Argonne National...

99

Inspection of Environment, Safety, and Health Management at the...  

Broader source: Energy.gov (indexed) [DOE]

Inspection of Environment, Safety, and Health Management at the Argonne National Laboratory - East, Volume I, May 2002 Inspection of Environment, Safety, and Health Management at...

100

Independent Oversight Inspection, Nevada Test Site, Volume 2...  

Broader source: Energy.gov (indexed) [DOE]

Volume 2 - September 2004 Independent Oversight Inspection, Nevada Test Site, Volume 2 - September 2004 September 2004 Inspection of Emergency Management at the Nevada Test Site...

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Independent Oversight Inspection, Nevada Test Site, Summary Report...  

Broader source: Energy.gov (indexed) [DOE]

Summary Report - October 2002 Independent Oversight Inspection, Nevada Test Site, Summary Report - October 2002 October 2002 Inspection of Environment, Safety, and Health and...

102

CRAD, Performance-Based Inspection - August 19, 2010 | Department...  

Broader source: Energy.gov (indexed) [DOE]

Performance-Based Inspection - November 29, 2011 CRAD, Nuclear Facility Construction - Piping and Pipe Supports Inspection - March 29, 2012 CRAD, Assessment of the Site - February...

103

Guidelines for Engineering, Design, and Inspection Costs - DOE...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5, Guidelines for Engineering, Design, and Inspection Costs by John Makepeace Functional areas: Construction and Engineering, Project Management Engineering, design, and inspection...

104

Natural Gas Vehicle Cylinder Safety, Training and Inspection...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Natural Gas Vehicle Cylinder Safety, Training and Inspection Project Natural Gas Vehicle Cylinder Safety, Training and Inspection Project Presentation from the U.S. DOE Office of...

105

INSPECTION REPORT: DOE/IG-0919 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

INSPECTION REPORT: DOEIG-0919 INSPECTION REPORT: DOEIG-0919 September 24, 2014 Management of Certain Aspects of the Human Reliability Program and Incident Reporting within the...

106

advanced maintenance inspection: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hemmers, Oliver 70 NRC INSPECTION MANUAL FSMEDWMEP INSPECTION PROCEDURE 84900 LOW-LEVEL RADIOACTIVE WASTE STORAGE CiteSeer Summary: To determine whether fuel cycle and materials...

107

Independent Oversight Inspection, Hanford Site - May 2004 | Department...  

Broader source: Energy.gov (indexed) [DOE]

May 2004 Independent Oversight Inspection, Hanford Site - May 2004 May 2004 Inspection of Emergency Management at the Hanford Site This report provides the results of an...

108

Independent Oversight Inspection, Hanford Site, Vol III - August...  

Broader source: Energy.gov (indexed) [DOE]

Site, Vol III - August 2001 Independent Oversight Inspection, Hanford Site, Vol III - August 2001 August 2001 Inspection of Emergency Management at the Hanford Site This report...

109

ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM 2010  

SciTech Connect (OSTI)

Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2010 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2010 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per SRR-LWE-2009-00138, HLW Tank Farm Inspection Plan for 2010, were completed. Ultrasonic measurements (UT) performed in 2010 met the requirements of C-ESG-00006, In-Service Inspection Program for High Level Waste Tanks, Rev. 3, and WSRC-TR-2002-00061, Rev.6. UT inspections were performed on Tanks 30, 31 and 32 and the findings are documented in SRNL-STI-2010-00533, Tank Inspection NDE Results for Fiscal Year 2010, Waste Tanks 30, 31 and 32. A total of 5824 photographs were made and 1087 visual and video inspections were performed during 2010. Ten new leaksites at Tank 5 were identified in 2010. The locations of these leaksites are documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.5. Ten leaksites at Tank 5 were documented during tank wall/annulus cleaning activities. None of these new leaksites resulted in a release to the environment. The leaksites were documented during wall cleaning activities and the waste nodules associated with the leaksites were washed away. Previously documented leaksites were reactivated at Tank 12 during waste removal activities.

West, B.; Waltz, R.

2011-06-23T23:59:59.000Z

110

Flexible ultrasonic pipe inspection apparatus  

DOE Patents [OSTI]

A flexible, modular ultrasonic pipe inspection apparatus, comprises a flexible, hollow shaft that carries a plurality of modules, including at least one rotatable ultrasonic transducer, a motor/gear unit, and a position/signal encoder. The modules are connected by flexible knuckle joints that allow each module of the apparatus to change its relative orientation with respect to a neighboring module, while the shaft protects electrical wiring from kinking or buckling while the apparatus moves around a tight corner. The apparatus is moved through a pipe by any suitable means, including a tether or drawstring attached to the nose or tail, differential hydraulic pressure, or a pipe pig. The rotational speed of the ultrasonic transducer and the forward velocity of the apparatus are coordinated so that the beam sweeps out the entire interior surface of the pipe, enabling the operator to accurately assess the condition of the pipe wall and determine whether or not leak-prone corrosion damage is present. 7 figs.

Jenkins, C.F.; Howard, B.D.

1998-06-23T23:59:59.000Z

111

CTBT on-site inspections  

SciTech Connect (OSTI)

On-site inspection (OSI) is a critical part of the verification regime for the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The OSI verification regime provides for international inspectors to make a suite of measurements and observations on site at the location of an event of interest. The other critical component of the verification regime is the International Monitoring System (IMS), which is a globally distributed network of monitoring stations. The IMS along with technical monitoring data from CTBT member countries, as appropriate, will be used to trigger an OSI. After the decision is made to carry out an OSI, it is important for the inspectors to deploy to the field site rapidly to be able to detect short-lived phenomena such as the aftershocks that may be observable after an underground nuclear explosion. The inspectors will be on site from weeks to months and will be working with many tens of tons of equipment. Parts of the OSI regime will be tested in a field exercise in the country of Jordan late in 2014. The build-up of the OSI regime has been proceeding steadily since the CTBT was signed in 1996 and is on track to becoming a deterrent to someone considering conducting a nuclear explosion in violation of the Treaty.

Zucca, J. J. [Principal Deputy, Global Security Directorate, Lawrence Livermore National Laboratory, Livermore, California (United States)

2014-05-09T23:59:59.000Z

112

Rocket Slated for Removal Following Inspections  

Broader source: Energy.gov [DOE]

LAS VEGAS Nevada Field Office and U.S. Air Force staff conducted inspections of a partially-buried rocket located at a historic testing location on the Tonopah Test Range (TTR) earlier this year.

113

ANNUAL FIRE CODE COMPLIANCE INSPECTION PROCESS  

E-Print Network [OSTI]

://SHAREPOINT.RMPS.CORNELL.EDU:8445/EHS/HSE DOCUMENTS/FIRE_CODE_INSPECTION_2014_REVISION.DOCX Table of Contents 1. Introduction................................................................................. 3 3.15 M.M. = Maintenance Management

Pawlowski, Wojtek

114

Component with inspection-facilitating features  

DOE Patents [OSTI]

A turbine airfoil can be formed with features to facilitate measurement of its wall thickness. An outer wall of the airfoil can include an outer surface and an inner surface. The outer surface of the airfoil can have an outer inspection target surface, and the inner surface of the airfoil can have an inner inspection target surface. The inner and outer target surfaces can define substantially flat regions in surfaces that are otherwise highly contoured. The inner and outer inspection target surfaces can be substantially aligned with each other. The inner and outer target surfaces can be substantially parallel to each other. As a result of these arrangements, a highly accurate measurement of wall thickness can be obtained. In one embodiment, the outer inspection target surface can be defined by an innermost surface of a groove formed in the outer surface of the outer wall of the airfoil.

Marra, John J; Zombo, Paul J

2014-02-11T23:59:59.000Z

115

Distributed PV Permitting and Inspection Processes  

Broader source: Energy.gov [DOE]

This presentation summarizes case studies of the time and cost involved in the distributed PV permitting and inspection process in three Solar America Cities, Austin, Portland, and Salt Lake City.

116

Independent Oversight Inspection, Pacific Northwest National Laboratory- December 2003  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety, and Health Management at the Pacific Northwest National Laboratory

117

Independent Oversight Inspection, Thomas Jefferson National Accelerator Facility- August 2008  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety and Health Programs at the Thomas Jefferson National Accelerator Facility

118

Independent Oversight Inspection, Lawrence Livermore National Laboratory- June 2005  

Broader source: Energy.gov [DOE]

Inspection of Emergency Management at the Livermore Site Office and Lawrence Livermore National Laboratory

119

Independent Oversight Inspection, Lawrence Livermore National Laboratory- May 2007  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety, and Health Programs at the Lawrence Livermore National Laboratory

120

Independent Oversight Inspection, Lawrence Livermore National Laboratory- February 2009  

Broader source: Energy.gov [DOE]

Inspection of Emergency Management at the Livermore Site Office and Lawrence Livermore National Laboratory

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Independent Oversight Inspection, Idaho National Laboratory- June 2005  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety, and Health Programs at the Idaho National Laboratory Advanced Test Reactor

122

Independent Oversight Inspection, Savannah River Site, Summary Report- February 2004  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety, and Health Management and Emergency Management at the Savannah River Site

123

Final environmental assessment for the U.S. Department of Energy, Oak Ridge Operations receipt and storage of uranium materials from the Fernald Environmental Management Project site  

SciTech Connect (OSTI)

Through a series of material transfers and sales agreements over the past 6 to 8 years, the Fernald Environmental Management Project (FEMP) has reduced its nuclear material inventory from 14,500 to approximately 6,800 metric tons of uranium (MTU). This effort is part of the US Department of energy`s (DOE`s) decision to change the mission of the FEMP site; it is currently shut down and the site is being remediated. This EA focuses on the receipt and storage of uranium materials at various DOE-ORO sites. The packaging and transportation of FEMP uranium material has been evaluated in previous NEPA and other environmental evaluations. A summary of these evaluation efforts is included as Appendix A. The material would be packaged in US Department of Transportation-approved shipping containers and removed from the FEMP site and transported to another site for storage. The Ohio Field Office will assume responsibility for environmental analyses and documentation for packaging and transport of the material as part of the remediation of the site, and ORO is preparing this EA for receipt and storage at one or more sites.

NONE

1999-06-01T23:59:59.000Z

124

International Nuclear Safeguards Inspection Support Tool  

SciTech Connect (OSTI)

The US Department of Energy (DOE) is committed to developing technologies to meet escalating requirements for the International Atomic Energy Agency (IAEA) Non-Proliferation Treaty (NPT) monitoring and associated inspections. This commitment involves the customization and transfer of existing remote monitoring/information management technologies for use by the IAEA. This paper describes an information management system called INSIST International Nuclear Safeguards Inspection Support Tool, which was developed by the Pacific Northwest Laboratory (PNL) to support the IAEA Action Team in its role of monitoring and verifying compliance under United Nations Special Commission (UNSC) Resolutions 687, 707, and 715. Initial emphasis was placed on developing and deploying functionality and databases customized to support the Action Team. Throughout the design and customization of INSIST, emphasis was placed on information storage and retrieval capabilities for data gathered by the Action Team. In addition, PNL provided the Action Team with maps and satellite images and other relevant Iraqi databases to further facilitate the following activities: monitoring nuclear activities, facility operations, and nuclear material inventories assisting in inspection planning and training providing post inspection analysis providing onsite inspection support reporting on inspection findings.

Steinmaus, K.L.; Wukelic, G.E.; Beal, O.M.

1994-03-01T23:59:59.000Z

125

Feasibility of Magnetostrictive Sensor Inspection of Containments  

SciTech Connect (OSTI)

This report describes the results of a study on the feasibility of using guided waves for long-range global inspection of containment metallic pressure boundaries (i.e., steel containments and liners of reinforced concrete containments) in nuclear power plants. Of particular concern in this study was the potential of the guided-wave approach for remotely inspecting the regions that are inaccessible; for example, regions where the metallic pressure boundary is backed by concrete on one or both sides. The study includes a literature review on long-range guided-wave inspection techniques, a modeling study of the behavior of guided waves in plates with different boundary conditions (e.g., freestanding and backed by concrete on one or both sides), and an experimental investigation of the feasibility of a guided-wave technique called ''magnetostrictive sensor (MsS)'' for (1) generating and detecting guided waves in plates and (2) detecting a defect over a long range. Results of the study showed (1) that it is feasible to achieve long-range global inspection of plates, including regions that are inaccessible, using low-frequency guided waves and (2) that the MsS technique is well suited for this application. Recommendations are made to further test and develop the MsS technique for practical implementation for containment inspection in nuclear power plants.

Kwun, H.

1999-03-01T23:59:59.000Z

126

MACS as a tool for international inspections  

SciTech Connect (OSTI)

The MACS/ACRS (Managed Access by Controlled Sensing/Access by Controlled Remote Sensing) system is a collection of communication devices, video capability, and distance-measuring equipment which can effectively substitute for the physical presence of a challenge inspector within a facility. The MACS design allows growth of the prototype, developed in response to the Chemical Weapons Convention (CWC), into a versatile device for inspection of sensitive nuclear facilities under other international arrangements, for example the proposed Fissile Material Cutoff Convention. A MACS/ACRS-type system in a standard, international-recognized configuration could resolve sensitive information and safety concerns through providing a means of achieving the goals of an inspection while excluding the inspector. We believe the technology used to develop MACS for the Defense Nuclear Agency, followed by ACRS for the Department of Energy, is universally adaptable for minimally-intrusive managed-access international inspections of sensitive sites.

Curtiss, J.A.; Indusi, J.P.

1995-08-01T23:59:59.000Z

127

Annual radioactive waste tank inspection program -- 1993  

SciTech Connect (OSTI)

Aqueous radioactive wastes from Savannah River Site (SRS) separations processes are contained in large underground carbon steel tanks. Inspections made during 1993 to evaluate these vessels, and evaluations based on data accrued by inspections made since the tanks were constructed, are the subject of this report. The 1993 inspection program revealed that the condition of the Savannah River Site waste tanks had not changed significantly from that reported in the previous annual report. No new leaksites were observed. No evidence of corrosion or materials degradation was observed in the waste tanks. However, degradation was observed on covers of the concrete encasements for the out-of-service transfer lines to Tanks 1 through 8.

McNatt, F.G. Sr.

1994-05-01T23:59:59.000Z

128

Contoured Surface Eddy Current Inspection System  

DOE Patents [OSTI]

Eddy current inspection of a contoured surface of a workpiece is performed by forming a backing piece of flexible, resiliently yieldable material with a contoured exterior surface conforming in shape to the workpiece contoured surface. The backing piece is preferably cast in place so as to conform to the workpiece contoured surface. A flexible eddy current array probe is attached to the contoured exterior surface of the backing piece such that the probe faces the contoured surface of the workpiece to be inspected when the backing piece is disposed adjacent to the workpiece. The backing piece is then expanded volumetrically by inserting at least one shim into a slot in the backing piece to provide sufficient contact pressure between the probe and the workpiece contoured surface to enable the inspection of the workpiece contoured surface to be performed.

Batzinger, Thomas James (Burnt Hills, NY); Fulton, James Paul (Clifton Park, NY); Rose, Curtis Wayne (Mechanicville, NY); Perocchi, Lee Cranford (Schenectady, NY)

2003-04-08T23:59:59.000Z

129

Vicinal light inspection of translucent materials  

DOE Patents [OSTI]

The present invention includes methods and apparatus for inspecting vicinally illuminated non-patterned areas of translucent materials. An initial image of the material is received. A second image is received following a relative translation between the material being inspected and a device generating the images. Each vicinally illuminated image includes a portion having optimal illumination, that can be extracted and stored in a composite image of the non-patterned area. The composite image includes aligned portions of the extracted image portions, and provides a composite having optimal illumination over a non-patterned area of the material to be inspected. The composite image can be processed by enhancement and object detection algorithms, to determine the presence of, and characterize any inhomogeneities present in the material.

Burns, Geroge R. (Albuquerque, NM); Yang, Pin (Albuquerque, NM)

2010-01-19T23:59:59.000Z

130

Resonant frequency method for bearing ball inspection  

DOE Patents [OSTI]

The present invention provides for an inspection system and method for detecting defects in test objects which includes means for generating expansion inducing energy focused upon the test object at a first location, such expansion being allowed to contract, thereby causing pressure wave within and on the surface of the test object. Such expansion inducing energy may be provided by, for example, a laser beam or ultrasonic energy. At a second location, the amplitudes and phases of the acoustic waves are detected and the resonant frequencies' quality factors are calculated and compared to predetermined quality factor data, such comparison providing information of whether the test object contains a defect. The inspection system and method also includes means for mounting the bearing ball for inspection.

Khuri-Yakub, B. T. (Palo Alto, CA); Hsieh, Chung-Kao (Stanford, CA)

1993-01-01T23:59:59.000Z

131

Resonant frequency method for bearing ball inspection  

DOE Patents [OSTI]

The present invention provides for an inspection system and method for detecting defects in test objects which includes means for generating expansion inducing energy focused upon the test object at a first location, such expansion being allowed to contract, thereby causing pressure wave within and on the surface of the test object. Such expansion inducing energy may be provided by, for example, a laser beam or ultrasonic energy. At a second location, the amplitudes and phases of the acoustic waves are detected and the resonant frequencies' quality factors are calculated and compared to predetermined quality factor data, such comparison providing information of whether the test object contains a defect. The inspection system and method also includes means for mounting the bearing ball for inspection. 5 figures.

Khuri-Yakub, B.T.; Chungkao Hsieh.

1993-11-02T23:59:59.000Z

132

X-ray radiography for container inspection  

DOE Patents [OSTI]

Arrangements of X-ray inspection systems are described for inspecting high-z materials in voluminous objects such as containers. Inspection methods may involve generating a radiographic image based on detected attenuation corresponding to a pulsed beams of radiation transmitted through a voluminous object. The pulsed beams of radiation are generated by a high-energy source and transmitted substantially downward along an incident angle, of approximately 1.degree. to 30.degree., to a vertical axis extending through the voluminous object. The generated radiographic image may be analyzed to detect on localized high attenuation representative of high-z materials and to discriminate high-z materials from lower and intermediate-z materials on the basis of the high density and greater attenuation of high-z material for higher energy (3-10 MeV) X-rays, and the compact nature of threatening masses of fissionable materials.

Katz, Jonathan I. (Clayton, MO); Morris, Christopher L. (Los Alamos, NM)

2011-06-07T23:59:59.000Z

133

Automated Spot Weld Inspection using Infrared Thermography  

SciTech Connect (OSTI)

An automated non-contact and non-destructive resistance spot weld inspection system based on infrared (IR) thermography was developed for post-weld applications. During inspection, a weld coupon was heated up by an auxiliary induction heating device from one side of the weld, while the resulting thermal waves on the other side were observed by an IR camera. The IR images were analyzed to extract a thermal signature based on normalized heating time, which was then quantitatively correlated to the spot weld nugget size. The use of normalized instead of absolute IR intensity was found to be useful in minimizing the sensitivity to the unknown surface conditions and environment interference. Application of the IR-based inspection system to different advanced high strength steels, thickness gauges and coatings were discussed.

Chen, Jian [ORNL] [ORNL; Zhang, Wei [ORNL] [ORNL; Yu, Zhenzhen [ORNL] [ORNL; Feng, Zhili [ORNL] [ORNL

2012-01-01T23:59:59.000Z

134

Raft river geothermal pump disassembly and inspection  

SciTech Connect (OSTI)

The disassembly and postoperation inspection of the Peerless geothermal water pump used in teh RRGE-1 well at the Raft River Geothermal Test Site are summarized. Disassembly was hampered by scale that froze some of the pump bearings onto the impeller shaft after operation ceased. The pump appeared otherwise in generally excellent condition after more than 1600 h running time in a geothermal environment. Most postoperation diameters of rotating parts were still within factory tolerance. The few out-of-tolerance bearing diameters could not be attributed to wear and could have been out of tolerance when received. This possibility points to a need for preoperation quality-control inspection of the bearings.

Van Treeck, R.

1983-02-01T23:59:59.000Z

135

Methods and apparatus for multi-parameter acoustic signature inspection  

DOE Patents [OSTI]

A multiparameter acoustic signature inspection device and method are described for non-invasive inspection of containers. Dual acoustic signatures discriminate between various fluids and materials for identification of the same.

Diaz, Aaron A. (Richland, WA); Samuel, Todd J. (Pasco, WA); Valencia, Juan D. (Kennewick, WA); Gervais, Kevin L. (Richland, WA); Tucker, Brian J. (Pasco, WA); Kirihara, Leslie J. (Richland, WA); Skorpik, James R. (Kennewick, WA); Reid, Larry D. (Benton City, WA); Munley, John T. (Benton City, WA); Pappas, Richard A. (Richland, WA); Wright, Bob W. (West Richland, WA); Panetta, Paul D. (Richland, WA); Thompson, Jason S. (Richland, WA)

2007-07-24T23:59:59.000Z

136

Electronic Out-fall Inspection Application - 12007  

SciTech Connect (OSTI)

In early 2009 an exciting opportunity was presented to the Geographic Information Systems (GIS) team at the Savannah River Site (SRS). The SRS maintenance group was directed to maintain all Out-falls on Site, increasing their workload from 75 to 183 out-falls with no additional resources. The existing out-fall inspection system consisted of inspections performed manually and documented via paper trail. The inspections were closed out upon completion of activities and placed in file cabinets with no central location for tracking/trending maintenance activities. A platform for meeting new improvements required for documentation by the Department of Health and Environmental Control (DHEC) out-fall permits was needed to replace this current system that had been in place since the 1980's. This was accomplished by building a geographically aware electronic application that improved reliability of site out-fall maintenance and ensured consistent standards were maintained for environmental excellence and worker efficiency. Inspections are now performed via tablet and uploaded to a central point. Work orders are completed and closed either in the field using tablets (mobile application) or in their offices (via web portal) using PCs. And finally completed work orders are now stored in a central database allowing trending of maintenance activities. (authors)

Weymouth, A Kent III; Pham, Minh; Messick, Chuck [Savannah River Nuclear Solutions, Aiken, South Carolina 29808 (United States)

2012-07-01T23:59:59.000Z

137

Electrical Inspection in the PHYSICS Division  

E-Print Network [OSTI]

recognized Nationally Recognized Testing Laboratory (NRTL) do not need to be inspected. Examples Technologies). #12;4 Examples of NRTL Markings #12;5 Equipment Considered Non-hazardous For 60 Hz AC, has no identified markings from any of the NRTL labs appearing on the OSHA list, the equipment

Kemner, Ken

138

Field Inspection Guidelines for PV Systems  

Broader source: Energy.gov [DOE]

This 2010 update to the 2006 edition consolidates the most import aspects of a field inspection into a simple process that can be performed in as little as 15 minutes. Explanations and illustrative pictures are included to instruct the inspector on the specific details of each step.

139

Remotely deployable aerial inspection using tactile sensors  

SciTech Connect (OSTI)

For structural monitoring applications, the use of remotely deployable Non-Destructive Evaluation (NDE) inspection platforms offer many advantages, including improved accessibility, greater safety and reduced cost, when compared to traditional manual inspection techniques. The use of such platforms, previously reported by researchers at the University Strathclyde facilitates the potential for rapid scanning of large areas and volumes in hazardous locations. A common problem for both manual and remote deployment approaches lies in the intrinsic stand-off and surface coupling issues of typical NDE probes. The associated complications of these requirements are obviously significantly exacerbated when considering aerial based remote inspection and deployment, resulting in simple visual techniques being the preferred sensor payload. Researchers at Bristol Robotics Laboratory have developed biomimetic tactile sensors modelled on the facial whiskers (vibrissae) of animals such as rats and mice, with the latest sensors actively sweeping their tips across the surface in a back and forth motion. The current work reports on the design and performance of an aerial inspection platform and the suitability of tactile whisking sensors to aerial based surface monitoring applications.

MacLeod, C. N.; Cao, J.; Pierce, S. G.; Dobie, G.; Summan, R. [Centre for Ultrasonic Engineering, University of Strathclyde, Glasgow, G1 1XW (United Kingdom); Sullivan, J. C.; Pipe, A. G. [Bristol Robotics Laboratory, University of the West of England, Bristol, BS16 1QY (United Kingdom)

2014-02-18T23:59:59.000Z

140

Explosion proof vehicle for tank inspection  

DOE Patents [OSTI]

An Explosion Proof Vehicle (EPV) having an interior substantially filled with an inert fluid creating an interior pressure greater than the exterior pressure. One or more flexible tubes provide the inert fluid and one or more electrical conductors from a control system to the vehicle. The vehicle is preferably used in subsurface tank inspection, whereby the vehicle is submerged in a volatile fluid.

Zollinger, William T. (Idaho Falls, ID); Klingler, Kerry M. (Idaho Falls, ID); Bauer, Scott G. (Idaho Falls, ID)

2012-02-28T23:59:59.000Z

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Analysis of inservice inspection relief requests  

SciTech Connect (OSTI)

Nuclear Regulatory Commission (NRC) regulations require inspection (ISI) of boiling or pressurized water-cooled nuclear power plants be performed in accordance with a referenced edition and addenda of Section XI, ``Rules for Inservice Inspection of Nuclear Power Plant components,`` of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. The regulations permit licensees to request relief from the NRC from specific ASME Code requirements that are determined to be impractical for the specific licensee. The NRC evaluates these requests and may grant such relief, but the NRC may also impose alternative or augmented inspections to assure structural reliability. The purpose,of this task was to evaluate the basis for ISI nondestructive examination (NDE) relief requests and to evaluate the effect of proposed ASME Code changes that would reduce the need for such requests or provide for more complete information in relief requests. This report contains the results of an analysis of an ISI relief request data base that has been expanded to include 1195 ISI relief requests versus the 296 relief requests covered in the first report in April 1987, EGG-SD-7430. Also relief requests were added to the data base which came from both first and second 10-year inspection intervals for several facilities. This provided the means to analyze the effect of recently approved ASME Code cases and updated Code requirements, some of which have been published as a result of earlier work on this task.

Aldrich, D.A.; Cook, J.F.

1989-08-01T23:59:59.000Z

142

Serpentine Robots for Industrial Inspection and Surveillance  

E-Print Network [OSTI]

the successful traverse of the shown obstacle. Fig. 1. The OmniTread Model OT-4 serpen- tine robot enteringSerpentine Robots for Industrial Inspection and Surveillance Grzegorz Granosik1, Johann Borenstein2 in common: small- sized mobile robots that can travel across the rubble of a collapsed building, squeeze

Borenstein, Johann

143

Monthly Tank Inspection Log Name of Campus  

E-Print Network [OSTI]

Monthly Tank Inspection Log Name of Campus Street Address of Campus City, State, and Zip Code of Campus 1 of 2 1. Facility PBS Registration Number 6. DISTRIBUTE TO : 2. Tank Number 3. Tank Registered(S) Satisfactory Repair or Adjustment Required Not Applicable Additional Comments Attached ABOVEGROUND STORAGE TANK

Rosen, Jay

144

STATE OF CALIFORNIA NATURAL RESOURCES AGENCY EDMUND G. BROWN JR., Governor NOTICE OF RECEIPT  

E-Print Network [OSTI]

STATE OF CALIFORNIA ­ NATURAL RESOURCES AGENCY EDMUND G. BROWN JR., Governor NOTICE OF RECEIPT PETITION TO AMEND the CALIFORNIA ENERGY COMMISSION DECISION for the SACRAMENTO POWER AUTHORITY CAMPBELL with the California Energy Commission requesting to amend Condition of Certification EFF-1 for the Campbell

145

Licensee contractor and vendor inspection status report. Quarterly report, January 1995--March 1995  

SciTech Connect (OSTI)

This periodical covers the results of inspections performed by the NRC`s Special Inspection Branch, Vendor Inspection Section, that have been distributed to the inspected organizations during the period from January 1995 through March 1995.

NONE

1995-05-01T23:59:59.000Z

146

241-AZ Farm Annulus Extent of Condition Baseline Inspection  

SciTech Connect (OSTI)

This report provides the results of the comprehensive annulus visual inspection for tanks 241- AZ-101 and 241-AZ-102 performed in fiscal year 2013. The inspection established a baseline covering about 95 percent of the annulus floor for comparison with future inspections. Any changes in the condition are also included in this document.

Engeman, Jason K.; Girardot, Crystal L.; Vazquez, Brandon J.

2013-05-15T23:59:59.000Z

147

241-AY-102 Leak Detection Pit Drain Line Inspection Report  

SciTech Connect (OSTI)

This document provides a description of the design components, operational approach, and results from the Tank AY-102 leak detection pit drain piping visual inspection. To perform this inspection a custom robotic crawler with a deployment device was designed, built, and operated by IHI Southwest Technologies, Inc. for WRPS to inspect the 6-inch leak detection pit drain line.

Boomer, Kayle D. [Washington River Protection Solutions, LLC (United States); Engeman, Jason K. [Washington River Protection Solutions, LLC (United States); Gunter, Jason R. [Washington River Protection Solutions, LLC (United States); Joslyn, Cameron C. [Washington River Protection Solutions, LLC (United States); Vazquez, Brandon J. [Washington River Protection Solutions, LLC (United States); Venetz, Theodore J. [Washington River Protection Solutions, LLC (United States); Garfield, John S. [AEM Consulting (United States)

2014-01-20T23:59:59.000Z

148

Abstracting Preparation  

E-Print Network [OSTI]

Guidelines & Review Manuscript Preparation Submit Your Manuscript Book Reviews Movies & Videos Contact of Biological and Chemical Sciences. Queen Mary, University of London, Mile End Road, London, UK. Abstract Two motive force for energy conversion, providing for metabolism, for active transport, and for synthesis

Allen, John F.

149

System for inspecting large size structural components  

DOE Patents [OSTI]

The present invention relates to a system for inspecting large scale structural components such as concrete walls or the like. The system includes a mobile gamma radiation source and a mobile gamma radiation detector. The source and detector are constructed and arranged for simultaneous movement along parallel paths in alignment with one another on opposite sides of a structural component being inspected. A control system provides signals which coordinate the movements of the source and detector and receives and records the radiation level data developed by the detector as a function of source and detector positions. The radiation level data is then analyzed to identify areas containing defects corresponding to unexpected variations in the radiation levels detected.

Birks, Albert S. (Columbus, OH); Skorpik, James R. (Kennewick, WA)

1990-01-01T23:59:59.000Z

150

An automated miniature robotic vehicle inspection system  

SciTech Connect (OSTI)

A novel, autonomous reconfigurable robotic inspection system for quantitative NDE mapping is presented. The system consists of a fleet of wireless (802.11g) miniature robotic vehicles, each approximately 175 125 85 mm with magnetic wheels that enable them to inspect industrial structures such as storage tanks, chimneys and large diameter pipe work. The robots carry one of a number of payloads including a two channel MFL sensor, a 5 MHz dry coupled UT thickness wheel probe and a machine vision camera that images the surface. The system creates an NDE map of the structure overlaying results onto a 3D model in real time. The authors provide an overview of the robot design, data fusion algorithms (positioning and NDE) and visualization software.

Dobie, Gordon; Summan, Rahul; MacLeod, Charles; Pierce, Gareth; Galbraith, Walter [Centre for Ultrasonic Engineering, University of Strathclyde, 204 George Street, Glasgow, G1 1XW (United Kingdom)

2014-02-18T23:59:59.000Z

151

Inspection of Nuclear Power Plant Containment Structures  

SciTech Connect (OSTI)

Safety-related nuclear power plant (NPP) structures are designed to withstand loadings from a number of low-probability external and interval events, such as earthquakes, tornadoes, and loss-of-coolant accidents. Loadings incurred during normal plant operation therefore generally are not significant enough to cause appreciable degradation. However, these structures are susceptible to aging by various processes depending on the operating environment and service conditions. The effects of these processes may accumulate within these structures over time to cause failure under design conditions, or lead to costly repair. In the late 1980s and early 1990s several occurrences of degradation of NPP structures were discovered at various facilities (e.g., corrosion of pressure boundary components, freeze- thaw damage of concrete, and larger than anticipated loss of prestressing force). Despite these degradation occurrences and a trend for an increasing rate of occurrence, in-service inspection of the safety-related structures continued to be performed in a somewhat cursory manner. Starting in 1991, the U.S. Nuclear Regulatory Commission (USNRC) published the first of several new requirements to help ensure that adequate in-service inspection of these structures is performed. Current regulatory in-service inspection requirements are reviewed and a summary of degradation experience presented. Nondestructive examination techniques commonly used to inspect the NPP steel and concrete structures to identify and quantify the amount of damage present are reviewed. Finally, areas where nondestructive evaluation techniques require development (i.e., inaccessible portions of the containment pressure boundary, and thick heavily reinforced concrete sections are discussed.

Graves, H.L.; Naus, D.J.; Norris, W.E.

1998-12-01T23:59:59.000Z

152

Experience gained from equipment qualification inspections  

SciTech Connect (OSTI)

This paper describes issues which have been identified during equipment qualification inspections. Generic qualification information is discussed first, such as qualification bases, utility/supplier interfaces, file auditability, and generic environmental qualification. Next, technical strategies with specific examples are discussed. Issues covered include functional performance requirements, post accident qualification, similarity, installation and interfaces, maintenance, aging, and testing. Finally, additions and deletions to equipment qualification master lists and environmental enveloping are discussed.

Jacobus, M.J.

1986-01-01T23:59:59.000Z

153

Audits & Inspections | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehicles » Alternative FuelNewsWashingtonAudits & Inspections Audits

154

RW Prepared  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofofOxford SiteToledo SiteTonawandaUniversity21Prepared by,..~Y-t7 Ii,r

155

Preparing Your  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for medical point07.06 AgendaPreparation forTrioxide The

156

Quality assurance (QA) plan for the transportation and receipt of transuranic (TRU) waste  

SciTech Connect (OSTI)

The Department of Energy (DOE) Albuquerque Operations (AL) Office of Projects and Energy Programs has been assigned the responsibility for administration of the disposal of Contact-Handled (CH) Transuranic (TRU) contaminated material (waste) from generator/storage sites of the United States defense programs that are operated by the DOE. This responsibility encompasses all activities associated with the certification of TRU waste and the transportation, receipt and disposal of that waste at the Waste Isolation Pilot Plant (WIPP). The WIPP is located near Carlsbad, New Mexico and is being developed under the management of the DOE WIPP Project Office (WPO). The DOE/WPO is a branch of the DOE/AL and has been delegated overall responsibility for all aspects of the WIPP program. This report describes the quality assurance plan for the TRU waste transportation and receipt of waste.

Not Available

1990-02-01T23:59:59.000Z

157

MACS as a tool for international inspections  

SciTech Connect (OSTI)

General acceptance of the challenge provision in the Chemical Weapons Convention has the potential for influence in other arms control areas. While most applications of the challenge inspection may be straightforward, there may be instances where access to the site by inspectors may be problematic. The MACS system described in this paper was developed to respond to these situations. Inspection and verification may be difficult when a host is unwilling,for valid reasons, to permit physical access to a site. We proposed a system of remote sensors which may be used to demonstrate compliance with Chemical Weapons Convention (CWC) challenge inspections even ff the inspector is physically excluded from a sensitive site. The system is based upon alternative-means-of-access provisions of the CWC. The Defense Nuclear Agency (DNA) funded design and construction of a system prototype, designated as MACS for Managed Access by Controlled Sensing. Features of the MACS design allow growth of the prototype into a versatile device for international monitoring of production facilities and other sites. MACS consists of instrumentation and communication equipment allowing site personnel to conduct a facility tour and perform acceptable measurements, while physically excluding the inspector from the facility. MACS consists of a base station used by the inspector, and a mobile unit used within the facility and manipulated by the facility staff. The base station and the mobile unit are @ed by a communication system, currently realized as a fiber optic cable. The mobile unit is equipped with television cameras and remote-reading distance-measuring equipment (DME) for use in verifying locations and dimensions. Global Positioning System receivers on the mobile unit provide both precise location and dead reckoning, suitable for tracking the mobile unit`s position while within a building when satellite signals are not available.

Curtiss, J.A.; Indusi, J.P.

1995-06-01T23:59:59.000Z

158

Inspection of Fusion Joints in Plastic Pipe  

SciTech Connect (OSTI)

The standard method of joining plastic pipe in the field is the butt fusion process. As in any pipeline application, joint quality greatly affects overall operational safety of the system. Currently no simple, reliable, cost-effective method exists for assessing the quality of fusion joints in the field. Visual examination and pressure testing are current nondestructive approaches, which do not provide any assurance about the long-term pipeline performance. This project developed, demonstrated, and validated an in-situ nondestructive inspection method for butt fusion joints in gas distribution plastic pipelines. The inspection system includes a laser-based image-recognition system that automatically generates and interprets digital images of pipe joints and assigns them a pass/fail rating, which eliminates operator bias in evaluating joint quality. An EWI-patented process, the Weld Zone Inspection Method (WZIM) was developed in which local heat is applied to the joint region to relax the residual stresses formed by the original joining operation, which reveals the surface condition of the joint. In cases where the joint is not formed under optimal conditions, and the intermolecular forces between contacting surfaces are not strong enough, the relaxation of macromolecules in the surface layer causes the material to pull back, revealing a fusion line. If the joint is sound, the bond line image does not develop. To establish initial feasibility of the approach, welds were performed under standard and nonstandard conditions. These welds were subjected to the WZIM and two destructive forms of testing: short-term tensile testing and long-term creep rupture testing. There appears to be a direct correlation between the WZIM and the destructive testing results. Although WZIM appears to be more sensitive than destructive testing can verify, the approach appears valid.

Connie Reichert

2005-09-01T23:59:59.000Z

159

Guidelines for Engineering, Design, and Inspection Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Engineering, design, and inspection (ED&I) activities begin with the preliminary design (Title I). Pre-Title I activities are not considered part of the ED&I activities. Architectural/Engineering (A/E) activities are part of the ED&I activities. A/E activities are services that are an integral part of the production and delivery of the design plans, specifications, and drawings. This chapter defines ED&I and A/E activities and discusses how to estimate and track them.

1997-03-28T23:59:59.000Z

160

Acoustic microscope surface inspection system and method  

DOE Patents [OSTI]

An acoustic microscope surface inspection system and method are described in which pulses of high frequency electrical energy are applied to a transducer which forms and focuses acoustic energy onto a selected location on the surface of an object and receives energy from the location and generates electrical pulses. The phase of the high frequency electrical signal pulses are stepped with respect to the phase of a reference signal at said location. An output signal is generated which is indicative of the surface of said selected location. The object is scanned to provide output signals representative of the surface at a plurality of surface locations. 7 figures.

Khuri-Yakub, B.T.; Parent, P.; Reinholdtsen, P.A.

1991-02-26T23:59:59.000Z

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Coordinate Measuring Machine Pit Artifact Inspection Procedure  

SciTech Connect (OSTI)

The goal of this document is to outline a procedure for dimensional measurement of Los Alamos National Laboratory's CMM Pit Artifact. This procedure will be used by the Manufacturing Practice's Inspection Technology Subgroup of the Interagency Manufacturing Operations Group and Joint Operations Weapon Operations Group (IMOG/JOWOG 39) round robin participants. The intent is to assess the state of industry within the Nuclear Weapons Complex for measurements made on this type of part and find which current measurement strategies and techniques produce the best results.

Montano, Joshua D. [Los Alamos National Laboratory

2012-07-31T23:59:59.000Z

162

Inspection Report: IG-0544 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 Inspection of the

163

Inspection Report: IG-0547 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 Inspection of the22, 2002

164

Inspection Report: IG-0557 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 Inspection of the22,

165

Inspection Report: IG-0563 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 Inspection of the22,July 1,

166

Inspection Report: IG-0585 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 Inspection of the22,July

167

Inspection Report: IG-0591 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 Inspection of the22,July20,

168

Inspection Report: IG-0592 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 Inspection of

169

Inspection Report: IG-0593 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 Inspection ofApril 1, 2003

170

Inspection Report: IG-0594 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 Inspection ofApril 1,

171

Inspection Report: IG-0597 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 Inspection ofApril 1,April

172

Inspection Report: IG-0604 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 Inspection ofApril

173

Inspection Report: IG-0615 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 Inspection ofAprilAugust

174

Inspection Report: IG-0636 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 Inspection

175

Inspection Report: IG-0645 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 InspectionApril 13, 2004

176

Inspection Report: IG-0650 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 InspectionApril 13,

177

Inspection Report: IG-0654 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 InspectionApril 13,July 6,

178

Inspection Report: IG-0656 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 InspectionApril 13,July

179

Inspection Report: IG-0658 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 InspectionApril 13,July1,

180

Inspection Report: IG-0671 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 InspectionApril

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Inspection Report: IG-0674 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 InspectionApril11, 2005

182

Inspection Report: IG-0677 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 InspectionApril11, 200522,

183

Inspection Report: IG-0679 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 InspectionApril11,

184

Inspection Report: IG-0681 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002 InspectionApril11,Concerns

185

Inspection Report: IG-0478 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA,Fermi NationalBusiness PlanPosting March 27, 20148, 2000 Inspection on

186

Inspection Report: IG-0480 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA,Fermi NationalBusiness PlanPosting March 27, 20148, 2000 Inspection

187

Inspection Report: IG-0482 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA,Fermi NationalBusiness PlanPosting March 27, 20148, 2000 Inspection28,

188

Inspection Report: IG-0790 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report: IG-0717 January620490

189

Inspection Report: IG-0809 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report: IG-0717 January62049009

190

Inspection Report: IG-0852 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report: IG-0717 January620490092

191

Inspection Report: IG-0859 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report: IG-0717 January6204900929

192

Inspection Report: IG-9701 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report: IG-0717

193

Inspection Report: IG-0833 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJune 20, 2012 The12, 2002April Inspection Report

194

Hanford Waste Vitrification Plant full-scale feed preparation testing with water and process simulant slurries  

SciTech Connect (OSTI)

The Hanford Waste Vitrification Plant was intended to convert selected, pretreated defense high-level waste and transuranic waste from the Hanford Site into a borosilicate glass. A full-scale testing program was conducted with nonradioactive waste simulants to develop information for process and equipment design of the feed-preparation system. The equipment systems tested included the Slurry Receipt and Adjustment Tank, Slurry Mix Evaporator, and Melter-Feed Tank. The areas of data generation included heat transfer (boiling, heating, and cooling), slurry mixing, slurry pumping and transport, slurry sampling, and process chemistry. 13 refs., 129 figs., 68 tabs.

Gaskill, J.R.; Larson, D.E.; Abrigo, G.P. [and others] [and others

1996-03-01T23:59:59.000Z

195

Innovation and Success in Solar Permitting and Inspections  

Broader source: Energy.gov (indexed) [DOE]

Webinar 2: Innovation and Success in Solar Permitting and Inspections Transcript June 26, 2013 Speaker: Courtney Kendal Slide 1: Good afternoon. My name is Courtney Kendall,...

196

Enhanced Photofission-based, Coincidence/Multiplicity Inspection Measurements  

SciTech Connect (OSTI)

An enhanced active interrogation system has been developed that integrates a transportable Idaho National Laboratory (INL) photonuclear inspection system, using a pulsed bremsstrahlung source and a reconfigurable neutron detection system, with a Los Alamos National Laboratory (LANL) list-mode data acquisition system. A series of active interrogation experiments have shown enhanced nuclear material detection and identification utilizing pulsed photofission-induced, neutron coincidence/multiplicity counting between pulses of an up-to-10-MeV electron accelerator. This paper describes the integrated inspection system and presents some key shielded and unshielded nuclear material inspection results. The enhanced inspection methodology has applicability to homeland security and possible nuclear weapon dismantlement treaties.

J.L. Jones; D.R. Norman; K.J. Haskell; M.T. Swinhoe; S.J. Tobin; W.H. Geist; R.B. Rothrock; C.R. Freeman

2010-07-01T23:59:59.000Z

197

Program Review, Workplace Inspections, Hazards Analysis And Abatement  

Broader source: Energy.gov [DOE]

This document provides guidance information and suggested procedures for performing program review, workplace inspections, hazards analysis, and abatement, successfully at DOE Federal employee worksites.

198

Wind Turbine Inspection Technology Reaches New Heights | GE Global...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

week, we announced our advancement in technology that will make the inspection of wind turbines faster and more reliable for our customers. Currently, an inspector examines the...

199

Independent Oversight Inspection, Nevada Test Site - June 2007...  

Broader source: Energy.gov (indexed) [DOE]

Environment, Safety, and Health Programs at the Nevada Test Site This report provides the results of an inspection of the environment, safety, and health programs at the Department...

200

Use, Maintenance, Removal, Inspections, and Safety of Dams (Iowa)  

Broader source: Energy.gov [DOE]

This section describes operating plans for dams with movable structures, as well as procedures for raising or lowering of impoundment levels, dam removal, and dam safety inspections.

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

aircraft nondestructive inspection: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OF A NEW NONDESTRUCTIVE INSPECTION SYSTEM FOR CASTING DEFECTS IN ENGINE CYLINDER BY PULSE HEATING INFRARED THERMOGRAPHY CiteSeer Summary: In this paper, a new inline nondestructive...

202

automated ultrasonic inspection: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

phased arrays is inspection speed: linear travel speeds of up to 100 mmsec are possible. Sizing is typically performed using diffraction approaches (TOFD and back diffraction),...

203

Auxiliary feedwater system risk-based inspection guide for the Byron and Braidwood nuclear power plants  

SciTech Connect (OSTI)

In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Byron and Braidwood were selected for the fourth study in this program. The produce of this effort is a prioritized listing of AFW failures which have occurred at the plants and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the Byron/Braidwood plants. 23 refs., 1 fig., 1 tab.

Moffitt, N.E.; Gore, B.F.: Vo, T.V. (Pacific Northwest Lab., Richland, WA (USA))

1991-07-01T23:59:59.000Z

204

Auxiliary feedwater system risk-based inspection guide for the H. B. Robinson nuclear power plant  

SciTech Connect (OSTI)

In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. H. B. Robinson was selected as one of a series of plants for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the H. B. Robinson plant.

Moffitt, N.E.; Lloyd, R.C.; Gore, B.F.; Vo, T.V. [Pacific Northwest Lab., Richland, WA (United States); Garner, L.W. [Nuclear Regulatory Commission, Washington, DC (United States)

1993-08-01T23:59:59.000Z

205

Auxiliary feedwater system risk-based inspection guide for the McGuire nuclear power plant  

SciTech Connect (OSTI)

In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. McGuire was selected as one of a series of plants for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the McGuire plant.

Bumgardner, J.D.; Lloyd, R.C.; Moffitt, N.E.; Gore, B.F.; Vo, T.V. [Pacific Northwest Lab., Richland, WA (United States)

1994-05-01T23:59:59.000Z

206

Auxiliary feedwater system risk-based inspection guide for the J. M. Farley Nuclear Power Plant  

SciTech Connect (OSTI)

In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment(PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. J. M. Farley was selected as the second plant for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important at the J. M. Farley plant. 23 refs., 1 fig., 1 tab.

Vo, T.V.; Pugh, R.; Gore, B.F.; Harrison, D.G. (Pacific Northwest Lab., Richland, WA (USA))

1990-10-01T23:59:59.000Z

207

Auxiliary feedwater system risk-based inspection guide for the Ginna Nuclear Power Plant  

SciTech Connect (OSTI)

In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. Ginna was selected as the eighth plant for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by NRC inspectors in the preparation of inspection plans addressing AFW risk-important components at the Ginna plant. 23 refs., 1 fig., 1 tab.

Pugh, R.; Gore, B.F.; Vo, T.V.; Moffitt, N.E. (Pacific Northwest Lab., Richland, WA (United States))

1991-09-01T23:59:59.000Z

208

Auxiliary feedwater system risk-based inspection guide for the South Texas Project nuclear power plant  

SciTech Connect (OSTI)

In a study sponsored by the US Nuclear Regulatory Commission (NRC), Pacific Northwest Laboratory has developed and applied a methodology for deriving plant-specific risk-based inspection guidance for the auxiliary feedwater (AFW) system at pressurized water reactors that have not undergone probabilistic risk assessment (PRA). This methodology uses existing PRA results and plant operating experience information. Existing PRA-based inspection guidance information recently developed for the NRC for various plants was used to identify generic component failure modes. This information was then combined with plant-specific and industry-wide component information and failure data to identify failure modes and failure mechanisms for the AFW system at the selected plants. South Texas Project was selected as a plant for study. The product of this effort is a prioritized listing of AFW failures which have occurred at the plant and at other PWRs. This listing is intended for use by the NRC inspectors in preparation of inspection plans addressing AFW risk important components at the South Texas Project plant.

Bumgardner, J.D.; Nickolaus, J.R.; Moffitt, N.E.; Gore, B.F.; Vo, T.V. [Pacific Northwest Lab., Richland, WA (United States)

1993-12-01T23:59:59.000Z

209

Eddy current inspection tool. [Patent application  

DOE Patents [OSTI]

A miniaturized inspection tool, for testing and inspection of metal objects in locations with difficult accessibility, which comprises eddy current sensing equipment with a probe coil, and associated coaxial coil cable, oil energizing means, and circuit means responsive to impedance changes in the coil as effected by induced eddy currents in a test object to produce a data output signal proportional to such changes. The coil and cable are slideably received in the utility channel of the flexible insertion tube of a fiberoptic scope. The scope is provided with light transmitting and receiving fiberoptics for viewing through the flexible tube, and articulation means for articulating the distal end of the tube and permitting close control of coil placement relative to a test object. The eddy current sensing equipment includes a tone generator for generating audible signals responsive to the data output signal. In one selected mode of operation, the tone generator responsive to the output signal above a selected level generates a constant single frequency tone for signalling detection of a discontinuity and, in a second selected mode, generates a tone whose frequency is proportional to the difference between the output signal and a predetermined selected threshold level.

Petrini, R.R.; Van Lue, D.F.

1980-10-29T23:59:59.000Z

210

Optical Inspection of Welding Seams Fabian Timm1,2  

E-Print Network [OSTI]

Optical Inspection of Welding Seams Fabian Timm1,2 , Thomas Martinetz1 , and Erhardt Barth1,2 1 present a framework for automatic inspection of welding seams based on specular reflections. To this end by using welding techniques. Soldering and welding techniques are common in diverse areas such as printed

211

University Fire Marshal's 2014 Annual Fire InspectionTraining  

E-Print Network [OSTI]

of 2000 led to NYS Governor's Task Force on Campus Fire Safety #12;Results of the Governors Task Force inspection of all educational buildings in New York State Enhanced detection/alarms in dorms Install Residential Code Building Code #12;Impacts to Cornell Annual Inspections of all Cornell buildings

Pawlowski, Wojtek

212

RELIABILITY OF SAMPLING INSPECTION SCHEMES APPLIED TO REPLACEMENT STEAM GENERATORS  

E-Print Network [OSTI]

RELIABILITY OF SAMPLING INSPECTION SCHEMES APPLIED TO REPLACEMENT STEAM GENERATORS Guy Roussel the size of the random sample of tubes to be inspected in replacement steam generators is revisited in this paper. A procedure to estimate the maximum number of defective tubes left in the steam generator after

Cizelj, Leon

213

Scene Inspection Using A Robotic Imaging System Balaji Ramadoss  

E-Print Network [OSTI]

, capturing data and images from various modalities, and displaying the results at a remote location thus systems are employed for inspection tasks in hazardous environments1 or difficult to reach areas2 precautions that must be taken before these inspections can be made. Shortage of light can also make

Abidi, Mongi A.

214

Optimal inspection scheduling with alternative fatigue reliability formulations for steel bridges  

E-Print Network [OSTI]

Optimal inspection scheduling with alternative fatigue reliability formulations for steel bridges H, USA Keywords: steel bridges, structural reliability, fatigue, optimal inspection, fracture, plate girder, box girder ABSTRACT: A reliability-based method for inspection scheduling of steel bridges

Manuel, Lance

215

High Throughput Web Inspection System using Time-stretch Real-time Imaging  

E-Print Network [OSTI]

successfully report a dark-field web inspection system withsample substrate for our dark-field web inspection systemweb inspection system exploiting time- stretch and utilizing the merits coming from dark-

Kim, Chanju

2013-01-01T23:59:59.000Z

216

Iraq hedges on arms inspections; CIA warns of ongoing programs  

SciTech Connect (OSTI)

International inspection terms received distinctly mixed signals from Iraqi officials during December inspection visits. Iraq's liasion to U.N. Special Commission (UNSCOM) inspection teams told the head of an UNSCOM chemical and biological weapons team that began a visit December 5 that Iraqi citizens would like to drink the blood' of the inspectors, and that Iraq would no longer cooperate with U.N. weapon inspection activities. An International Atomic Energy Agency (IAEA) nuclear inspection team in Iraq at the same time, however, was told by its chief Iraqi liasion officer that Baghdad was finally willing to answer questions about Iraq's foreign procurement network for nuclear equipment and technology. These contradictory developments came only days before the head of U.S. Intelligence made renewed allegations about Iraq's weapons capabilities.

Wolfsthal, J.

1992-12-01T23:59:59.000Z

217

Dose reduction for snubber inspection and testing  

SciTech Connect (OSTI)

This paper reports that Health physics staff members at Grand Gulf Nuclear Station have implemented several dose reduction methods for snubber inspection, testing and changeout. These methods include construction maps to permit easy location of snubbers in the drywell, painting azimuth numbers on the inside drywell wall and biological shield wall to coincide with the maps, requiring pre-job briefings for quality inspectors and craft support personnel, using job history files for work planning, using experienced inspectors and craft personnel whenever possible, designating certain craft personnel solely for snubber work, and cutting out stuck snubber pins rather than attempting intact removal. The total dose for snubber-related tasks has been significantly reduced using these methods.

Morrison, G.M.; Cotton, S.R. (Entergy Operations, Inc. (US))

1991-10-01T23:59:59.000Z

218

Inspection of Used Fuel Dry Storage Casks  

SciTech Connect (OSTI)

ABSTRACT The U.S. Nuclear Regulatory Commission (NRC) regulates the storage of used nuclear fuel, which is now and will be increasingly placed in dry storage systems. Since a final disposition pathway is not defined, the fuel is expected to be maintained in dry storage well beyond the time frame originally intended. Due to knowledge gaps regarding the viability of current dry storage systems for long term use, efforts are underway to acquire the technical knowledge and tools required to understand the issues and verify the integrity of the dry storage system components. This report summarizes the initial efforts performed by researchers at Idaho National Laboratory and Argonne National Laboratory to identify and evaluate approaches to in-situ inspection dry storage casks. This task is complicated by the design of the current storage systems that severely restrict access to the casks.

Dennis C. Kunerth; Tim McJunkin; Mark McKay; Sasan Bakhtiari

2012-09-01T23:59:59.000Z

219

Small diameter, deep bore optical inspection system  

DOE Patents [OSTI]

An improved rod optic system for inspecting small diameter, deep bores. The system consists of a rod optic system utilizing a curved mirror at the end of the rod lens such that the optical path through the system is bent 90.degree. to minimize optical distortion in examining the sides of a curved bore. The system is particularly useful in the examination of small bores for corrosion, and is capable of examining 1/16 inch diameter and up to 4 inch deep drill holes, for example. The positioning of the curved mirror allows simultaneous viewing from shallow and right angle points of observation of the same artifact (such as corrosion) in the bore hole. The improved rod optic system may be used for direct eye sighting, or in combination with a still camera or a low-light television monitor; particularly low-light color television.

Lord, David E. (Livermore, CA); Petrini, Richard R. (Livermore, CA); Carter, Gary W. (Livermore, CA)

1981-01-01T23:59:59.000Z

220

DOE-STD-1071-94; DOE Standard Guideline to Good Practices for Material Receipt, Inspection, Handling, Storage, Retrieval, and Issuance at DOE Nuclear Facilities  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Deliciouscritical_materials_workshop_presentations.pdfSTD-1040-93 DOE-STD-1040-93 DOE-STD-1070-94 June 1994 DOE71-94

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Joint Estimation of NDE Inspection Capability and Flaw-size Distribution for in-service Aircraft Inspections  

E-Print Network [OSTI]

1 Joint Estimation of NDE Inspection Capability and Flaw- size Distribution for in-service Aircraft, Dayton, OH 45469 Abstract: Nondestructive evaluation (NDE) is widely used in the aerospace industry of unknown existing cracks is more difficult. If NDE signal strength is recorded at all inspections

222

E-Print Network 3.0 - aircraft composite inspections Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The First Joint DoDFAANASA Conference on Aging Aircraft 1997 July 8-10 Ogden UT Remote and Automated Inspection: Status and Prospects Summary: automated) inspection of...

223

annual post-closure inspection: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fire Sciences 217 NRC INSPECTION MANUAL FSMEDWMEP INSPECTION PROCEDURE 84900 LOW-LEVEL RADIOACTIVE WASTE STORAGE CiteSeer Summary: To determine whether fuel cycle and materials...

224

Innovative Sensors for Pipeline Crawlers: Rotating Permanent Magnet Inspection  

SciTech Connect (OSTI)

Internal inspection of pipelines is an important tool for ensuring safe and reliable delivery of fossil energy products. Current inspection systems that are propelled through the pipeline by the product flow cannot be used to inspect all pipelines because of the various physical barriers they may encounter. To facilitate inspection of these ''unpiggable'' pipelines, recent inspection development efforts have focused on a new generation of powered inspection platforms that are able to crawl slowly inside a pipeline and can maneuver past the physical barriers that limit internal inspection applicability, such as bore restrictions, low product flow rate, and low pressure. The first step in this research was to review existing inspection technologies for applicability and compatibility with crawler systems. Most existing inspection technologies, including magnetic flux leakage and ultrasonic methods, had significant implementation limitations including mass, physical size, inspection energy coupling requirements and technology maturity. The remote field technique was the most promising but power consumption was high and anomaly signals were low requiring sensitive detectors and electronics. After reviewing each inspection technology, it was decided to investigate the potential for a new inspection method. The new inspection method takes advantage of advances in permanent magnet strength, along with their wide availability and low cost. Called rotating permanent magnet inspection (RPMI), this patent pending technology employs pairs of permanent magnets rotating around the central axis of a cylinder to induce high current densities in the material under inspection. Anomalies and wall thickness variations are detected with an array of sensors that measure local changes in the magnetic field produced by the induced current flowing in the material. This inspection method is an alternative to the common concentric coil remote field technique that induces low-frequency eddy currents in ferromagnetic pipes and tubes. Since this is a new inspection method, both theory and experiment were used to determine fundamental capabilities and limitations. Fundamental finite element modeling analysis and experimental investigations performed during this development have led to the derivation of a first order analytical equation for designing rotating magnetizers to induce current and positioning sensors to record signals from anomalies. Experimental results confirm the analytical equation and the finite element calculations provide a firm basis for the design of RPMI systems. Experimental results have shown that metal loss anomalies and wall thickness variations can be detected with an array of sensors that measure local changes in the magnetic field produced by the induced current flowing in the material. The design exploits the phenomenon that circumferential currents are easily detectable at distances well away from the magnets. Current changes at anomalies were detectable with commercial low cost Hall Effect sensors. Commercial analog to digital converters can be used to measure the sensor output and data analysis can be performed in real time using PC computer systems. The technology was successfully demonstrated during two blind benchmark tests where numerous metal loss defects were detected. For this inspection technology, the detection threshold is a function of wall thickness and corrosion depth. For thinner materials, the detection threshold was experimentally shown to be comparable to magnetic flux leakage. For wall thicknesses greater than three tenths of an inch, the detection threshold increases with wall thickness. The potential for metal loss anomaly sizing was demonstrated in the second benchmarking study, again with accuracy comparable to existing magnetic flux leakage technologies. The rotating permanent magnet system has the potential for inspecting unpiggable pipelines since the magnetizer configurations can be sufficiently small with respect to the bore of the pipe to pass obstructions that limit the application of many i

J. Bruce Nestleroth; Richard J. Davis; Stephanie Flamberg

2006-09-30T23:59:59.000Z

225

Double-shell tank ultrasonic inspection plan. Revision 1  

SciTech Connect (OSTI)

The waste tank systems managed by the Tank Waste Remediation System Division of Westinghouse Hanford Company includes 28 large underground double-shell tanks (DST) used for storing hazardous radioactive waste. The ultrasonic (UT) inspection of these tanks is part of their required integrity assessment (WAC 1993) as described in the tank systems integrity assessment program plan (IAPP) (Pfluger 1994a) submitted to the Ecology Department of the State of Washington. Because these tanks hold radioactive waste and are located underground examinations and inspections must be done remotely from the tank annuli with specially designed equipment. This document describes the UT inspection system (DSTI system), the qualification of the equipment and procedures, field inspection readiness, DST inspections, and post-inspection activities. Although some of the equipment required development, the UT inspection technology itself is the commercially proven and available projection image scanning technique (P-scan). The final design verification of the DSTI system will be a performance test in the Hanford DST annulus mockup that includes the demonstration of detecting and sizing corrosion-induced flaws.

Pfluger, D.C.

1994-09-30T23:59:59.000Z

226

Wireless Roadside Inspection Proof of Concept Test Final Report  

SciTech Connect (OSTI)

The U.S. Department of Transportation (DOT) FMCSA commissioned the Wireless Roadside Inspection (WRI) Program to validate technologies and methodologies that can improve safety through inspections using wireless technologies that convey real-time identification of commercial vehicles, drivers, and carriers, as well as information about the condition of the vehicles and their drivers. It is hypothesized that these inspections will: -- Increase safety -- Decrease the number of unsafe commercial vehicles on the road; -- Increase efficiency -- Speed up the inspection process, enabling more inspections to occur, at least on par with the number of weight inspections; -- Improve effectiveness -- Reduce the probability of drivers bypassing CMV inspection stations and increase the likelihood that fleets will attempt to meet the safety regulations; and -- Benefit industry -- Reduce fleet costs, provide good return-on-investment, minimize wait times, and level the playing field. The WRI Program is defined in three phases which are: Phase 1: Proof of Concept Test (POC) Testing of commercially available off-the-shelf (COTS) or near-COTS technology to validate the wireless inspection concept. Phase 2: Pilot Test Safety technology maturation and back office system integration Phase 3: Field Operational Test Multi-vehicle testing over a multi-state instrumented corridor This report focuses on Phase 1 efforts that were initiated in March, 2006. Technical efforts dealt with the ability of a Universal Wireless Inspection System (UWIS) to collect driver, vehicle, and carrier information; format a Safety Data Message Set from this information; and wirelessly transmit a Safety Data Message Set to a roadside receiver unit or mobile enforcement vehicle.

Capps, Gary J [ORNL; Franzese, Oscar [ORNL; Knee, Helmut E [ORNL; Plate, Randall S [ORNL; Lascurain, Mary Beth [ORNL

2009-03-01T23:59:59.000Z

227

Review of Section XI inservice inspection program effectiveness  

SciTech Connect (OSTI)

To evaluate the effectiveness of Section XI, Division 1, {open_quotes}Rules for Inservice Inspection of Nuclear Power Plant Components,{close_quotes} of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, searches were performed of the Licensing Event Report and Nuclear Plant Reliability Data System computerized data bases, and a review was made of inservice inspection summary reports. It was found that the Section XI examinations and tests detect flaws in welds and plant components and result in subsequent corrective action. This study also shows that the format and topics of information provided in Section XI-prescribed inservice inspection summary reports vary widely.

Cook, J.F. Sr.

1993-08-01T23:59:59.000Z

228

2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites  

SciTech Connect (OSTI)

This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) in 2013 at 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978.1 These activities verified that the UMTRCA Title I disposal sites remain in compliance with license requirements. DOE operates 18 UMTRCA Title I sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) in accordance with Title 10 Code of Federal Regulations Part 40.27 (10 CFR 40.27). As required under the general license, a long-term surveillance plan (LTSP) for each site was prepared by DOE and accepted by NRC. The Grand Junction, Colorado, Disposal Site, one of the 19 Title I sites, will not be included under the general license until the open, operating portion of the cell is closed. The open portion will be closed either when it is filled or in 2023. This site is inspected in accordance with an interim LTSP. Long-term surveillance and maintenance services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective actions; and performing administrative, records, stakeholder relations, and other regulatory stewardship functions. Annual site inspections and monitoring are conducted in accordance with site-specific LTSPs and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up or contingency inspections, or corrective action in accordance with the LTSP. LTSPs and site compliance reports are available on the Internet at http://www.lm.doe.gov/.

none,

2014-03-01T23:59:59.000Z

229

Time for Training Guidance On receipt of a Time to Train request please contact your HR Adviser who will  

E-Print Network [OSTI]

1 Time for Training Guidance On receipt of a Time to Train request please contact your HR Adviser eligibility criteria for time to train 1.1 The right to request time to train applies to all employees from 6th April 2010. Not all training requests have to be made using the time to train request. Where good

Sussex, University of

230

Lessons Learned from Annual Inspection Process - 12329  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Office of Legacy Management's (LM) mission is to manage DOE's post-closure responsibilities and ensure the future protection of human health and the environment. LM has control and custody of legacy land, structures, and facilities and is responsible for maintaining them at levels suitable for their long-term use. As defined by the DOE guidance document Long-Term Stewardship Planning Guidance for Closure Sites, long-term stewardship refers to all activities necessary to ensure protection of human health and the environment. These activities include, but are not limited to, 'all engineered and institutional controls (ICs) designed to contain or to prevent exposure to residual contamination and waste, such as surveillance activities, record-keeping activities, inspections, groundwater monitoring, maintenance of other barriers and contained structures, access control, and posting signs'. The development and management of ICs have been, and continue to be, critical to the success of LM surveillance and maintenance activities. (authors)

Kothari, Vijendra [Weldon Spring Site Manager, DOE Office of Legacy Management, Morgantown, West Virginia (United States); Uhlmeyer, Terri; Thompson, Randy [SM Stoller Corporation, St. Charles, Missouri (United States)

2012-07-01T23:59:59.000Z

231

A Rapid Scanning Inspection Method for Insulated Ferromagnetic Tubing  

E-Print Network [OSTI]

long expanse of insulated piping. PA Incorporated has developed an electromagnetic inspection device which rapidly scans nearly 100 percent of an insulated pipeline (flanges and tees excluded) and provides a quantitative (2 percent) measurement...

Marsh, G. M.; Milewits, M.

1984-01-01T23:59:59.000Z

232

aid aircraft inspections: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

deviations of the ILS to within 0.015 degree accuracy. Therefore, a flight inspection system requires a high level of accuracy in determining position which Stanford University 16...

233

Mag-Foot: a steel bridge inspection robot  

E-Print Network [OSTI]

A legged robot that moves across a steel structure is developed for steel bridge inspection. Powerful permanent magnets imbedded in each foot allow the robot to hang from a steel ceiling powerlessly. Although the magnets ...

Asada, Harry

234

V-232: Cisco ASA Software TFTP Protocol Inspection Denial of...  

Broader source: Energy.gov (indexed) [DOE]

T-536: Cisco ASA Multiple Flaws Let Remote Users Deny Service and Bypass Security Controls V-071: Cisco ASA 1000V Cloud Firewall H.323 Inspection Bug Lets Remote Users Deny Service...

235

Ultrasonic nondestructive inspection of solid objects Tadeusz Stepinski  

E-Print Network [OSTI]

for nondestructive evaluation (NDE) of materials for more than half a cen- tury. A number of NDE techniques have been. Two main setups normally used in NDE for ultrasonic inspection of solid objects are contact

236

Statement of Work Service Agreement for Testing and Inspection...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Services companies to support its Testing and Inspection needs on an individual task order basis. As the site has grown, NREL has realized that there are technical, safety, and...

237

High Speed Instrumentation for Inspection of transparent parts  

E-Print Network [OSTI]

In micro manufacturing (MEMS, polymer hot-embossing, polymer roll-to-roll imprint, etc.) precise micro and nano-sized features are distributed over large areas. In order to inspect for defects or employ statistical process ...

Ljubicic, Dean M

2013-01-01T23:59:59.000Z

238

assessment initial inspection: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

instrumentation for in-line inspection of automotive body parts in an industrial environment. Roman Gr. Maev; Fedar Seviaryn 2011-01-01 163 Two-dimensional Computer Vision...

239

Evaluation of Low-Level Waste Disposal Receipt Data for Los Alamos National Laboratory Technical Area 54, Area G Disposal Facility - Fiscal Year 2011  

SciTech Connect (OSTI)

The Los Alamos National Laboratory (LANL or the Laboratory) generates radioactive waste as a result of various activities. Operational or institutional waste is generated from a wide variety of research and development activities including nuclear weapons development, energy production, and medical research. Environmental restoration (ER), and decontamination and decommissioning (D and D) waste is generated as contaminated sites and facilities at LANL undergo cleanup or remediation. The majority of this waste is low-level radioactive waste (LLW) and is disposed of at the Technical Area 54 (TA-54), Area G disposal facility. U.S. Department of Energy (DOE) Order 435.1 (DOE, 2001) requires that radioactive waste be managed in a manner that protects public health and safety, and the environment. To comply with this order, DOE field sites must prepare and maintain site-specific radiological performance assessments for LLW disposal facilities that accept waste after September 26, 1988. Furthermore, sites are required to conduct composite analyses that account for the cumulative impacts of all waste that has been (or will be) disposed of at the facilities and other sources of radioactive material that may interact with the facilities. Revision 4 of the Area G performance assessment and composite analysis was issued in 2008 (LANL, 2008). These analyses estimate rates of radionuclide release from the waste disposed of at the facility, simulate the movement of radionuclides through the environment, and project potential radiation doses to humans for several on-site and off-site exposure scenarios. The assessments are based on existing site and disposal facility data and on assumptions about future rates and methods of waste disposal. The accuracy of the performance assessment and composite analysis depends upon the validity of the data used and assumptions made in conducting the analyses. If changes in these data and assumptions are significant, they may invalidate or call into question certain aspects of the analyses. For example, if the volumes and activities of waste disposed of during the remainder of the disposal facility's lifetime differ significantly from those projected, the doses projected by the analyses may no longer apply. DOE field sites are required to implement a performance assessment and composite analysis maintenance program. The purpose of this program is to ensure the continued applicability of the analyses through incremental improvement of the level of understanding of the disposal site and facility. Site personnel are required to conduct field and experimental work to reduce the uncertainty in the data and models used in the assessments. Furthermore, they are required to conduct periodic reviews of waste receipts, comparing them to projected waste disposal rates. The radiological inventory for Area G was updated in conjunction with Revision 4 of the performance assessment and composite analysis (Shuman, 2008). That effort used disposal records and other sources of information to estimate the quantities of radioactive waste that have been disposed of at Area G from 1959, the year the facility started receiving waste on a routine basis, through 2007. It also estimated the quantities of LLW that will require disposal from 2008 through 2044, the year in which it is assumed that disposal operations at Area G will cease. This report documents the fourth review of Area G disposal receipts since the inventory was updated and examines information for waste placed in the ground during fiscal years (FY) 2008 through 2011. The primary objective of the disposal receipt review is to ensure that the future waste inventory projections developed for the performance assessment and composite analysis are consistent with the actual types and quantities of waste being disposed of at Area G. Toward this end, the disposal data that are the subject of this review are used to update the future waste inventory projections for the disposal facility. These projections are compared to the future inventory projections that were develope

French, Sean B. [Los Alamos National Laboratory; Shuman, Robert [WPS: WASTE PROJECTS AND SERVICES

2012-04-17T23:59:59.000Z

240

Independent Oversight Inspection, Argonne National Laboratory- East, Summary Report- May 2002  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety, and Health and Emergency Management at the Argonne National Laboratory - East

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Independent Oversight Inspection, Lawrence Livermore National Laboratory, Summary Report- July 2002  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety, and Health and Emergency Management at the Lawrence Livermore National Laboratory

242

Independent Oversight Inspection, Lawrence Livermore National Laboratory, Volume I- December 2004  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety, and Health Management at the Lawrence Livermore National Laboratory

243

Independent Oversight Inspection, Waste Isolation Pilot Plant, Summary Report- August 2002  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety, and Health and Emergency Management at the Waste Isolation Pilot Plant

244

Risk-based inspection in ASME Section XI  

SciTech Connect (OSTI)

By 1970 the first edition of the ASME Code Section XI, Inservice Inspection of Nuclear Reactor Coolant Systems was published. From its inception, the Section XI inservice inspection scope was based on a fundamental risk-based selection process. In other words the inservice inspection scope included components where the consequences of a pressure boundary failure were high. Once the consequence significant system boundaries were established, inspections would then be performed at locations believed to be most susceptible service induced failure. Current Section XI requirements require that inspection locations be selected on the basis of peak stress and fatigue usage values contained in the Design Reports. These original stress calculations were designed to qualify a design and assure that the plant would provide reliable service throughout its design life. For the most part, the fatigue usage values in these reports do not provide an accurate measure of service life. As service history has demonstrated, the use of Design Report stresses and fatigue usage values can be misleading. The Section XI ISI inspection requirements have always been intended to focus inspections at those locations in the plant that pose the greater risk to reactor safety. This fundamental principle behind the Section XI inspection requirements has guided Section XI since its inception. However, today Utility resources are limited. The move in many states to deregulate utilities and growing competition from independent power producers is challenging Owners to reduce operating and maintenance cost without sacrificing safety. These programs should allow plants to focus limited resources on those locations where damage mechanisms are active and consequences are high. This will provide for efficient use of plants resources and improve safety.

Lance, J.J.

1996-12-01T23:59:59.000Z

245

KLA-Tencor's Inspection Tool Reduces LED Manufacturing Costs  

Broader source: Energy.gov [DOE]

With the help of DOE funding, KLA-Tencor is developing an improved inspection tool for LED manufacturing that promises to significantly increase overall process yields and minimize expensive waste. The power of the inspection tool lies in optical detection techniques coupled with defect source analysis software to statistically correlate front-end geometric anomalies in the substrate to killer defects on the back end of the manufacturing line, which give rise to an undesirable or unusable end product.

246

An intelligent inspection and survey robot. Volume 1  

SciTech Connect (OSTI)

ARIES {number_sign}1 (Autonomous Robotic Inspection Experimental System), has been developed for the Department of Energy to survey and inspect drums containing low-level radioactive waste stored in warehouses at DOE facilities. The drums are typically stacked four high and arranged in rows with three-foot aisle widths. The robot will navigate through the aisles and perform an inspection operation, typically performed by a human operator, making decisions about the condition of the drums and maintaining a database of pertinent information about each drum. A new version of the Cybermotion series of mobile robots is the base mobile vehicle for ARIES. The new Model K3A consists of an improved and enhanced mobile platform and a new turret that will permit turning around in a three-foot aisle. Advanced sonar and lidar systems were added to improve navigation in the narrow drum aisles. Onboard computer enhancements include a VMEbus computer system running the VxWorks real-time operating system. A graphical offboard supervisory UNIX workstation is used for high-level planning, control, monitoring, and reporting. A camera positioning system (CPS) includes primitive instructions for the robot to use in referencing and positioning the payload. The CPS retracts to a more compact position when traveling in the open warehouse. During inspection, the CPS extends up to deploy inspection packages at different heights on the four-drum stacks of 55-, 85-, and 110-gallon drums. The vision inspection module performs a visual inspection of the waste drums. This system will locate and identify each drum, locate any unique visual features, characterize relevant surface features of interest and update a data-base containing the inspection data.

NONE

1995-12-15T23:59:59.000Z

247

Ultrasonic inspection apparatus and method using a focused wave device  

DOE Patents [OSTI]

An ultrasonic pulse echo inspection apparatus and method for detecting structural failures. A focus lens is coupled to the transducer to focus the ultrasonic signal on an area to be inspected and a stop is placed in the focus lens to block selected ultrasonic waves. Other waves are not blocked and are transmitted through the structure to arrive at interfaces therein concurrently to produce an echo response with significantly less distortion.

Gieske, John H. (Albuquerque, NM); Roach, Dennis P. (Albuquerque, NM); Walkington, Phillip D. (Albuquerque, NM)

2001-01-01T23:59:59.000Z

248

Licensee contractor and vendor and vendor inspection status report. Quarterly report, July 1995--September 1995  

SciTech Connect (OSTI)

This periodical covers the results of inspections performed by the NRC`s Special Inspection Branch, Vendor Inspection Section, that have been distributed to the inspected organizations during the period from July 1995 through September 1995. Vendors inspected include: (1) Continental Disc Corporation, (2) Divesco, (3) Eaton, (4) General Electric Nuclear Energy, (5) ITT Barton, (6) Liberty Technologies, (7) Mid-South Nuclear, (8) Power Distribution Services, (9) Rosemount, (10) Target-Rock, and (11) Westinghouse Electric.

NONE

1995-12-01T23:59:59.000Z

249

Evaluations of Structural Failure Probabilities and Candidate Inservice Inspection Programs  

SciTech Connect (OSTI)

The work described in this report applies probabilistic structural mechanics models to predict the reliability of nuclear pressure boundary components. These same models are then applied to evaluate the effectiveness of alternative programs for inservice inspection to reduce these failure probabilities. Results of the calculations support the development and implementation of risk-informed inservice inspection of piping and vessels. Studies have specifically addressed the potential benefits of ultrasonic inspections to reduce failure probabilities associated with fatigue crack growth and stress-corrosion cracking. Parametric calculations were performed with the computer code pc-PRAISE to generate an extensive set of plots to cover a wide range of pipe wall thicknesses, cyclic operating stresses, and inspection strategies. The studies have also addressed critical inputs to fracture mechanics calculations such as the parameters that characterize the number and sizes of fabrication flaws in piping welds. Other calculations quantify uncertainties associated with the inputs calculations, the uncertainties in the fracture mechanics models, and the uncertainties in the resulting calculated failure probabilities. A final set of calculations address the effects of flaw sizing errors on the effectiveness of inservice inspection programs.

Khaleel, Mohammad A.; Simonen, Fredric A.

2009-05-01T23:59:59.000Z

250

Office Automation Document Preparation  

E-Print Network [OSTI]

.2 Distinctions 1.3 Facilities 1.3.1 Document Preparation 1.3.2 Records Management 1.3.3 Communication 1 organizations contemplating the installation of document-preparation systems. * Administrative managersOffice Automation and Document Preparation for the v' University of North Carolina at Chapel Hill

North Carolina at Chapel Hill, University of

251

Agile Machining and Inspection Non-Nuclear Report (NNR) Project  

SciTech Connect (OSTI)

This report is a high level summary of the eight major projects funded by the Agile Machining and Inspection Non-Nuclear Readiness (NNR) project (FY06.0422.3.04.R1). The largest project of the group is the Rapid Response project in which the six major sub categories are summarized. This project focused on the operations of the machining departments that will comprise Special Applications Machining (SAM) in the Kansas City Responsive Infrastructure Manufacturing & Sourcing (KCRIMS) project. This project was aimed at upgrading older machine tools, developing new inspection tools, eliminating Classified Removable Electronic Media (CREM) in the handling of classified Numerical Control (NC) programs by installing the CRONOS network, and developing methods to automatically load Coordinated-Measuring Machine (CMM) inspection data into bomb books and product score cards. Finally, the project personnel leaned perations of some of the machine tool cells, and now have the model to continue this activity.

Lazarus, Lloyd

2009-02-19T23:59:59.000Z

252

Licensee contractor and vendor inspection status report. Quarterly progress report, April 1996--June 1996  

SciTech Connect (OSTI)

The federal government and nuclear industry have established a system for the inspection of commercial nuclear facilities to provide for multiple levels of inspection and verification. The Vendor Inspection System (VIS) of the Special Inspection Branch reviews and inspects the quality and suitability of vendor products, licensee-vendor interface, environmental qualification of equipment, and review of equipment problems found during operation and their corrective action. This report contains copies of all vendor inspection reports issued during the calendar year for which it is published.

NONE

1996-08-01T23:59:59.000Z

253

Inspection apparatus for evaluating a partially completed weld  

DOE Patents [OSTI]

An inspection apparatus for evaluating a partially completed weld is described and which is utilized in combination with an automated movable welder which moves across a supporting surface, and wherein the inspection apparatus includes a coupling member mounted on the welder; a frame member mounted on the coupling member; an ultrasonic sensor mounted on the frame member and disposed in ultrasonic sound transmitting relation relative to the partially completed weld; and a drive assembly for adjusting the position of the ultrasonic sensor relative to the partially completed weld.

Smartt, Herschel B. (Idaho Falls, ID); Larsen, Eric D. (Idaho Falls, ID); Johnson, Jonn A. (Idaho Falls, ID)

2001-01-01T23:59:59.000Z

254

WSRC Reactor Tank Inspection Program (RTIP) status report  

SciTech Connect (OSTI)

Westinghouse Savannah River Company (WSRC) recently completed the initial phase of nondestructive inspections of the Savannah River Site's (SRS) reactor tanks. This program required almost three years to be conceptualized, fabricated, and tested. An additional 20 months were required to complete the NDE inspection of the P, K and L reactor tanks. The overall cost of the program to date is approximately $25 MM. This status report will address: (1) A brief review of the RTIP program and the constraints which had to be overcome (2) A summary of the examination results of the P,K, and L Reactor tanks. (3) A projection of the future enhancements and capabilities presently in development.

Loibl, M.W.

1992-01-01T23:59:59.000Z

255

Inspection Report: S02IS020 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report:0-02 Inspection2IS020

256

Inspection Report: S05IS022 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report:0-02 Inspection2IS0205IS022

257

Inspection Report: S99IS019 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report:0-029IS019 Inspection

258

Pulse-echo ultrasonic inspection system for in-situ nondestructive inspection of Space Shuttle RCC heat shields.  

SciTech Connect (OSTI)

The reinforced carbon-carbon (RCC) heat shield components on the Space Shuttle's wings must withstand harsh atmospheric reentry environments where the wing leading edge can reach temperatures of 3,000 F. Potential damage includes impact damage, micro cracks, oxidation in the silicon carbide-to-carbon-carbon layers, and interlaminar disbonds. Since accumulated damage in the thick, carbon-carbon and silicon-carbide layers of the heat shields can lead to catastrophic failure of the Shuttle's heat protection system, it was essential for NASA to institute an accurate health monitoring program. NASA's goal was to obtain turnkey inspection systems that could certify the integrity of the Shuttle heat shields prior to each mission. Because of the possibility of damaging the heat shields during removal, the NDI devices must be deployed without removing the leading edge panels from the wing. Recently, NASA selected a multi-method approach for inspecting the wing leading edge which includes eddy current, thermography, and ultrasonics. The complementary superposition of these three inspection techniques produces a rigorous Orbiter certification process that can reliably detect the array of flaws expected in the Shuttle's heat shields. Sandia Labs produced an in-situ ultrasonic inspection method while NASA Langley developed the eddy current and thermographic techniques. An extensive validation process, including blind inspections monitored by NASA officials, demonstrated the ability of these inspection systems to meet the accuracy, sensitivity, and reliability requirements. This report presents the ultrasonic NDI development process and the final hardware configuration. The work included the use of flight hardware and scrap heat shield panels to discover and overcome the obstacles associated with damage detection in the RCC material. Optimum combinations of custom ultrasonic probes and data analyses were merged with the inspection procedures needed to properly survey the heat shield panels. System features were introduced to minimize the potential for human factors errors in identifying and locating the flaws. The in-situ NDI team completed the transfer of this technology to NASA and USA employees so that they can complete 'Return-to-Flight' certification inspections on all Shuttle Orbiters prior to each launch.

Roach, Dennis Patrick; Walkington, Phillip D.; Rackow, Kirk A.

2005-06-01T23:59:59.000Z

259

Post-Closure Inspection Letter Report for Corrective Action Units on the Nevada National Security Site  

SciTech Connect (OSTI)

This letter serves as the post-closure inspection letter report for corrective action units on the Nevada National Security Site for calendar year 2011. Copies of completed inspection checklists are included in this report.

NSTec Environmental Restoration

2011-05-26T23:59:59.000Z

260

V-071: Cisco ASA 1000V Cloud Firewall H.323 Inspection Bug Lets...  

Office of Environmental Management (EM)

71: Cisco ASA 1000V Cloud Firewall H.323 Inspection Bug Lets Remote Users Deny Service V-071: Cisco ASA 1000V Cloud Firewall H.323 Inspection Bug Lets Remote Users Deny Service...

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Advanced EL inspection with predictive estimation of module power loss  

E-Print Network [OSTI]

Advanced EL inspection with predictive estimation of module power loss Ralph Schmidt (Dipl.-Ing) pi4_robotics GmbH Berlin #12;Agenda: - Introduction pi4 - The idea: Estimate power loss at an early stage in production - Investigation of single cells with defects - Estimation of Power loss for PV

262

Effective Conveyor Belt Inspection for Improved Mining Productivity  

SciTech Connect (OSTI)

This document details progress on the project entitled ''Effective Conveyor Belt Inspection for Improved Mining Productivity'' during the period from November 15, 2004 to May 14, 2004. Highlights include fabrication of low-cost prototype hardware, acquisition of infrared thermal data, and initial design of a Smart-Camera based system.

Chris Fromme

2006-06-01T23:59:59.000Z

263

Effective Conveyor Belt Inspection for Improved Mining Productivity  

SciTech Connect (OSTI)

This document details progress on the project entitled ''Effective Conveyor Belt Inspection for Improved Mining Productivity'' during the period from November 15, 2004 to May 14, 2004. Highlights include fabrication of an improved LED lightbar, fabrication of a line-scan sensor head for the Smart-Camera based prototype, and development of prototype vulcanized splice detection algorithms.

Chris Fromme

2006-06-01T23:59:59.000Z

264

Apparatus for the concurrent inspection of partially completed welds  

DOE Patents [OSTI]

An apparatus for the concurrent inspection of partially completed welds is described in which is utilized in combination with a moveable welder for forming a partially completed weld, and an ultrasonic generator mounted on a moveable welder in which is reciprocally moveable along a path of travel which is laterally disposed relative to the partially completed weld.

Smartt, Herschel B. (Idaho Falls, ID); Johnson, John A. (Idaho Falls, ID); Larsen, Eric D. (Idaho Falls, ID); Bitsoi, Rodney J. (Ririe, ID); Perrenoud, Ben C. (Rigby, ID); Miller, Karen S. (Idaho Falls, ID); Pace, David P. (Idaho Falls, ID)

2002-01-01T23:59:59.000Z

265

Wireless Roadside Inspection Proof-of-Concept Test  

E-Print Network [OSTI]

Wireless Roadside Inspection Proof-of-Concept Test Phase 1A ­ Generating SDMS PeopleNet, a producer Message Set (SDMS). Data obtained during a 10-hour test was compared to similar data obtained through. DESCRIPTIONRESULTS The majority of the data obtained from the PeopleNet SDMS was accurate. However, the tested system

266

H-CANYON AIR EXHAUST TUNNEL INSPECTION VEHICLE DEVELOPMENT  

SciTech Connect (OSTI)

The H-Canyon at Savannah River Site is a large concrete structure designed for chemical separation processes of radioactive material. The facility requires a large ventilation system to maintain negative pressure in process areas for radioactive contamination control and personnel protection. The ventilation exhaust is directed through a concrete tunnel under the facility which is approximately five feet wide and 8 feet tall that leads to a sand filter and stack. Acidic vapors in the exhaust have had a degrading effect on the surface of the concrete tunnels. Some areas have been inspected; however, the condition of other areas is unknown. Experience from historical inspections with remote controlled vehicles will be discussed along with the current challenge of inspecting levels below available access points. The area of interest in the exhaust tunnel must be accessed through a 14 X 14 inch concrete plug in the floor of the hot gang valve corridor. The purpose for the inspection is to determine the condition of the inside of the air tunnel and establish if there are any structural concerns. Various landmarks, pipe hangers and exposed rebar are used as reference points for the structural engineers when evaluating the current integrity of the air tunnel.

Minichan, R.; Fogle, R.; Marzolf, A.

2011-05-24T23:59:59.000Z

267

Independent Oversight Inspection, East Tennessee Technology Park, Summary Report- May 2003  

Broader source: Energy.gov [DOE]

Inspection of Environment, Safety, and Health and Emergency Management at the Oak Ridge Operations Office and East Tennessee Technology Park

268

Effects of time constraint and percent defective on visual inspection performance  

E-Print Network [OSTI]

. Richard 0 . Huchi ngson The objective of this study was to evaluate inspection perfor- mance under various levels of percent defective per sample and time available to inspect. Three samples of matrices (40 in each sample) containing 10/ (A), 25ll (B... administered to each subject to determine how well their test scores predicted performance. The subjects' task consisted of inspecting the samples of matrices presented in series on a CRT screen. Experiment I was performed to determine an average inspection...

Gilmore, Walter Edgar

1982-01-01T23:59:59.000Z

269

Preparation of acetaldehyde  

DOE Patents [OSTI]

Disclosed is a process for the preparation of acetaldehyde by the hydrogenation of ketene in the presence of a transition metal hydrogenation catalyst.

Tustin, Gerald Charles (Kingsport, TN); Depew, Leslie Sharon (Kingsport, TN)

1997-10-21T23:59:59.000Z

270

Modular Inspection System for a Complete IN-Service Examination of Nuclear Reactor Pressure Vessel, Including Beltline Region  

SciTech Connect (OSTI)

Final Report for a DOE Phase II Contract Describing the design and fabrication of a reactor inspection modular rover prototype for reactor vessel inspection.

David H. Bothell

2000-04-30T23:59:59.000Z

271

Pipe inspection using the pipe crawler. Innovative technology summary report  

SciTech Connect (OSTI)

The US Department of Energy (DOE) continually seeks safer and more cost-effective remediation technologies for use in the decontamination and decommissioning (D and D) of nuclear facilities. In several of the buildings at the Fernald Site, there is piping that was used to transport process materials. As the demolition of these buildings occur, disposal of this piping has become a costly issue. Currently, all process piping is cut into ten-foot or less sections, the ends of the piping are wrapped and taped to prevent the release of any potential contaminants into the air, and the piping is placed in roll off boxes for eventual repackaging and shipment to the Nevada Test Site (NTS) for disposal. Alternatives that allow for the onsite disposal of process piping are greatly desired due to the potential for dramatic savings in current offsite disposal costs. No means is currently employed to allow for the adequate inspection of the interior of piping, and consequently, process piping has been assumed to be internally contaminated and thus routinely disposed of at NTS. The BTX-II system incorporates a high-resolution micro color camera with lightheads, cabling, a monitor, and a video recorder. The complete probe is capable of inspecting pipes with an internal diameter (ID) as small as 1.4 inches. By using readily interchangeable lightheads, the same system is capable of inspecting piping up to 24 inches in ID. The original development of the BTX system was for inspection of boiler tubes and small diameter pipes for build-up, pitting, and corrosion. However, the system is well suited for inspecting the interior of most types of piping and other small, confined areas. The report describes the technology, its performance, uses, cost, regulatory and policy issues, and lessons learned.

NONE

1999-05-01T23:59:59.000Z

272

Smart Infrared Inspection System Field Operational Test Final Report  

SciTech Connect (OSTI)

The Smart InfraRed Inspection System (SIRIS) is a tool designed to assist inspectors in determining which vehicles passing through the SIRIS system are in need of further inspection by measuring the thermal data from the wheel components. As a vehicle enters the system, infrared cameras on the road measure temperatures of the brakes, tires, and wheel bearings on both wheel ends of commercial motor vehicles (CMVs) in motion. This thermal data is then presented to enforcement personal inside of the inspection station on a user friendly interface. Vehicles that are suspected to have a violation are automatically alerted to the enforcement staff. The main goal of the SIRIS field operational test (FOT) was to collect data to evaluate the performance of the prototype system and determine the viability of such a system being used for commercial motor vehicle enforcement. From March 2010 to September 2010, ORNL facilitated the SIRIS FOT at the Greene County Inspection Station (IS) in Greeneville, Tennessee. During the course of the FOT, 413 CMVs were given a North American Standard (NAS) Level-1 inspection. Of those 413 CMVs, 384 were subjected to a SIRIS screening. A total of 36 (9.38%) of the vehicles were flagged by SIRIS as having one or more thermal issues; with brakes issues making up 33 (91.67%) of those. Of the 36 vehicles flagged as having thermal issues, 31 (86.11%) were found to have a violation and 30 (83.33%) of those vehicles were placed out-of-service (OOS). Overall the enforcement personnel who have used SIRIS for screening purposes have had positive feedback on the potential of SIRIS. With improvements in detection algorithms and stability, the system will be beneficial to the CMV enforcement community and increase overall trooper productivity by accurately identifying a higher percentage of CMVs to be placed OOS with minimal error. No future evaluation of SIRIS has been deemed necessary and specifications for a production system will soon be drafted.

Siekmann, Adam [ORNL; Capps, Gary J [ORNL; Franzese, Oscar [ORNL; Lascurain, Mary Beth [ORNL

2011-06-01T23:59:59.000Z

273

Enhanced HFIR overpower margin through improvements in fuel plate homogeneity inspection  

SciTech Connect (OSTI)

Fuel homogeneity inspection techniques used on the HFIR fuel plates have recently been improved through conversion of the X-ray inspection device to acquire, store, and process data digitally. This paper reports some early results from using the improved equipment and describes future plans for obtaining enhanced fuel thermal performance by exploiting this improved inspection capability.

Rothrock, R.B.; Hale, R.E.; Knight, R.W. [Oak Ridge National Lab., TN (United States); Cheverton, R.D.

1995-09-01T23:59:59.000Z

274

WELDING INSPECTION USING NOVEL SPECULARITY FEATURES AND A ONE-CLASS SVM  

E-Print Network [OSTI]

WELDING INSPECTION USING NOVEL SPECULARITY FEATURES AND A ONE-CLASS SVM Fabian Timm, Sascha Klement extraction, One-class classification, Welding seam inspection, Machine vision. Abstract: We present a framework for automatic inspection of welding seams based on specular reflections. Therefore, we introduce

275

Inspection of selected intelligence and special access program work-for-others projects  

SciTech Connect (OSTI)

At the request of the former Secretary, an inspection of six classified intelligence and special access program work-for-others projects was conducted. The purpose of this inspection was to evaluate managements, effectiveness regarding these work-for-others projects and included tests for financial integrity and adherence to applicable laws and regulations. Details of the inspection are provided in this report.

Not Available

1993-10-08T23:59:59.000Z

276

Biosafety Inspection Protocol In accordance with best practices and National Institutes of Health (NIH) guidelines section IV-B-3-c-(1), periodic  

E-Print Network [OSTI]

of Health (NIH) guidelines section IV-B-3-c-(1), periodic inspections and re-inspections by the University

277

Experience with the implementation of a risk-based ISI program and inspection qualification  

SciTech Connect (OSTI)

Rolls Royce and Associates (RRA) are the Design Authority (DA) for Nuclear Steam Raising Plant (NSRP) used for the Royal Naval Nuclear Fleet. Over the past seven years RRA, with support from the Ministry of Defense, has developed and implemented a risk based in-service inspection (RBISI) strategy for the NSRP. Having used risk as a means of optimizing where to inspect, an inspection qualification (IQ) process has now been put in place to ensure that proposed inspections deliver the expected gains assumed. This qualification process follows very closely that currently being put forward by the European Network on Inspection Qualification (ENIQ).

Chapman, O.J.V. [Rolls Royce and Associates Ltd., Derby (United Kingdom)

1996-12-01T23:59:59.000Z

278

Receipt of Guideline-Concordant Treatment in Elderly Prostate Cancer Patients  

SciTech Connect (OSTI)

Purpose: To examine the proportion of elderly prostate cancer patients receiving guideline-concordant treatment, using the Surveillance, Epidemiology, and End Results (SEER)-Medicare linked database. Methods and Materials: A total of 29,001 men diagnosed in 2004-2007 with localized prostate cancer, aged 66 to 79 years, were included. We characterized the proportion of men who received treatment concordant with the National Comprehensive Cancer Network guidelines, stratified by risk group and age. Logistic regression was used to examine covariates associated with receipt of guideline-concordant management. Results: Guideline concordance was 79%-89% for patients with low- or intermediate-risk disease. Among high-risk patients, 66.6% of those aged 66-69 years received guideline-concordant management, compared with 51.9% of those aged 75-79 years. Discordance was mainly due to conservative managementno treatment or hormone therapy alone. Among the subgroup of patients aged ?76 years with no measured comorbidity, findings were similar. On multivariable analysis, older age (75-79 vs 66-69 years, odds ratio 0.51, 95% confidence interval 0.50-0.57) was associated with a lower likelihood of guideline concordance for high-risk prostate cancer, but comorbidity was not. Conclusions: There is undertreatment of elderly but healthy patients with high-risk prostate cancer, the most aggressive form of this disease.

Chen, Ronald C., E-mail: Ronald_chen@med.unc.edu [Department of Radiation Oncology, University of North Carolina at Chapel Hill, Chapel Hill, North Carolina (United States); Sheps Center for Health Services Research, University of North Carolina at Chapel Hill, Chapel Hill, North Carolina (United States); Lineberger Comprehensive Cancer Center, University of North Carolina at Chapel Hill, Chapel Hill, North Carolina (United States); Carpenter, William R. [Sheps Center for Health Services Research, University of North Carolina at Chapel Hill, Chapel Hill, North Carolina (United States); Lineberger Comprehensive Cancer Center, University of North Carolina at Chapel Hill, Chapel Hill, North Carolina (United States); Gillings School of Global Public Health, University of North Carolina at Chapel Hill, Chapel Hill, North Carolina (United States); Hendrix, Laura H. [Department of Radiation Oncology, University of North Carolina at Chapel Hill, Chapel Hill, North Carolina (United States); Bainbridge, John [Sheps Center for Health Services Research, University of North Carolina at Chapel Hill, Chapel Hill, North Carolina (United States); Wang, Andrew Z. [Department of Radiation Oncology, University of North Carolina at Chapel Hill, Chapel Hill, North Carolina (United States); Lineberger Comprehensive Cancer Center, University of North Carolina at Chapel Hill, Chapel Hill, North Carolina (United States); Nielsen, Matthew E. [Sheps Center for Health Services Research, University of North Carolina at Chapel Hill, Chapel Hill, North Carolina (United States); Lineberger Comprehensive Cancer Center, University of North Carolina at Chapel Hill, Chapel Hill, North Carolina (United States); Department of Urology, University of North Carolina at Chapel Hill, Chapel Hill, North Carolina (United States); and others

2014-02-01T23:59:59.000Z

279

Automated robotic equipment for ultrasonic inspection of pressurizer heater wells  

DOE Patents [OSTI]

A robotic device for remotely inspecting pressurizer heater wells is provided which has the advantages of quickly, precisely, and reliably acquiring data at reasonable cost while also reducing radiation exposure of an operator. The device comprises a prober assembly including a probe which enters a heater well, gathers data regarding the condition of the heater well and transmits a signal carrying that data; a mounting device for mounting the probe assembly at the opening of the heater well so that the probe can enter the heater well; a first motor mounted on the mounting device for providing movement of the probe assembly in an axial direction; and a second motor mounted on the mounting device for providing rotation of the probe assembly. This arrangement enables full inspection of the heater well to be carried out.

Nachbar, Henry D. (Ballston Lake, NY); DeRossi, Raymond S. (Amsterdam, NY); Mullins, Lawrence E. (Middle Grove, NY)

1993-01-01T23:59:59.000Z

280

Method for the concurrent ultrasonic inspection of partially completed welds  

DOE Patents [OSTI]

A method for the concurrent ultrasonic inspection of partially completed welds is disclosed and which includes providing a pair of transducers which are individually positioned on the opposite sides of a partially completed weld to be inspected; moving the transducers along the length of and laterally inwardly and outwardly relative to the partially completed weld; pulsing the respective transducers to produce an ultrasonic signal which passes through or is reflected from the partially completed weld; receiving from the respective transducers ultrasonic signals which pass through or are reflected from the partially completed welds; and analyzing the ultrasonic signal which has passed through or is reflected from the partially completed weld to determine the presence of any weld defects.

Johnson, John A. (Idaho Falls, ID); Larsen, Eric D. (Idaho Falls, ID); Miller, Karen S. (Idaho Falls, ID); Smartt, Herschel B. (Idaho Falls, ID); McJunkin, Timothy R. (Idaho Falls, ID)

2002-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Active Classification: Theory and Application to Underwater Inspection  

E-Print Network [OSTI]

We discuss the problem in which an autonomous vehicle must classify an object based on multiple views. We focus on the active classification setting, where the vehicle controls which views to select to best perform the classification. The problem is formulated as an extension to Bayesian active learning, and we show connections to recent theoretical guarantees in this area. We formally analyze the benefit of acting adaptively as new information becomes available. The analysis leads to a probabilistic algorithm for determining the best views to observe based on information theoretic costs. We validate our approach in two ways, both related to underwater inspection: 3D polyhedra recognition in synthetic depth maps and ship hull inspection with imaging sonar. These tasks encompass both the planning and recognition aspects of the active classification problem. The results demonstrate that actively planning for informative views can reduce the number of necessary views by up to 80% when compared to passive methods...

Hollinger, Geoffrey A; Sukhatme, Gaurav S

2011-01-01T23:59:59.000Z

282

WSRC Reactor Tank Inspection Program (RTIP) status report  

SciTech Connect (OSTI)

Westinghouse Savannah River Company (WSRC) recently completed the initial phase of nondestructive inspections of the Savannah River Site`s (SRS) reactor tanks. This program required almost three years to be conceptualized, fabricated, and tested. An additional 20 months were required to complete the NDE inspection of the P, K and L reactor tanks. The overall cost of the program to date is approximately $25 MM. This status report will address: (1) A brief review of the RTIP program and the constraints which had to be overcome (2) A summary of the examination results of the P,K, and L Reactor tanks. (3) A projection of the future enhancements and capabilities presently in development.

Loibl, M.W.

1992-06-01T23:59:59.000Z

283

Final Report Inspection of Aged/Degraded Containments Program.  

SciTech Connect (OSTI)

The Inspection of Aged/Degraded Containments Program had primary objectives of (1) understanding the significant factors relating corrosion occurrence, efficacy of inspection, and structural capacity reduction of steel containments and liners of reinforced concrete containments; (2) providing the United States Nuclear Regulatory Commission (USNRC) reviewers a means of establishing current structural capacity margins or estimating future residual structural capacity margins for steel containments, and concrete containments as limited by liner integrity; (3) providing recommendations, as appropriate, on information to be requested of licensees for guidance that could be utilized by USNRC reviewers in assessing the seriousness of reported incidences of containment degradation; and (4) providing technical assistance to the USNRC (as requested) related to concrete technology. Primary program accomplishments have included development of a degradation assessment methodology; reviews of techniques and methods for inspection and repair of containment metallic pressure boundaries; evaluation of high-frequency acoustic imaging, magnetostrictive sensor, electromagnetic acoustic transducer, and multimode guided plate wave technologies for inspection of inaccessible regions of containment metallic pressure boundaries; development of a continuum damage mechanics-based approach for structural deterioration; establishment of a methodology for reliability-based condition assessments of steel containments and liners; and fragility assessments of steel containments with localized corrosion. In addition, data and information assembled under this program has been transferred to the technical community through review meetings and briefings, national and international conference participation, technical committee involvement, and publications of reports and journal articles. Appendix A provides a listing of program reports, papers, and publications; and Appendix B contains a listing of program-related presentations.

Naus, Dan J [ORNL; Ellingwood, B R [Georgia Institute of Technology; Oland, C Barry [ORNL

2005-09-01T23:59:59.000Z

284

Scheduling screening inspections for replaceable and non-replaceable systems  

E-Print Network [OSTI]

. For instance, the American Cancer Society recommends three tests to detect signs of breast cancer: mammography, clinical breast exam and breast self-examination. Additionally, the American Medical Womens Association recommends annual mammography and clin- ical... cancer. For instance, mammography?s ability to detect a breast cancer when it is already started is estimated to 77.6% in (Houssami, Ciatto, Irwig, Simpson and Macaskill, 2002). Therefore, when designing screening inspection schedules, the fallibility...

Aral, Bahadir

2009-05-15T23:59:59.000Z

285

Improving the reliability of automated non-destructive inspection  

SciTech Connect (OSTI)

In automated NDE a region of an inspected component is often interrogated several times, be it within a single data channel, across multiple channels or over the course of repeated inspections. The systematic combination of these diverse readings is recognized to provide a means to improve the reliability of the inspection, for example by enabling noise suppression. Specifically, such data fusion makes it possible to declare regions of the component defect-free to a very high probability whilst readily identifying indications. Registration, aligning input datasets to a common coordinate system, is a critical pre-computation before meaningful data fusion takes place. A novel scheme based on a multiobjective optimization is described. The developed data fusion framework, that is able to identify and rate possible indications in the dataset probabilistically, based on local data statistics, is outlined. The process is demonstrated on large data sets from the industrial ultrasonic testing of aerospace turbine disks, with major improvements in the probability of detection and probability of false call being obtained.

Brierley, N.; Tippetts, T.; Cawley, P. [Imperial College London, South Kensington Campus, SW7 2AZ (United Kingdom)

2014-02-18T23:59:59.000Z

286

Automated inspection of surface breaking cracks using GMR sensor arrays  

SciTech Connect (OSTI)

We present a prototype for automated magnetic stray field testing of ferromagnetic roller bearings. For this purpose NDE-adapted GMR sensor arrays (giant magneto resistance) are used for the detection of surface breaking cracks. The sensors are miniaturized down to the lower ?m-regime to achieve adequate spatial resolution. In doing so, sensor arrays with up to 48 elements are used to inspect the bearing surface within a few seconds only. In contrast to magnetic particle inspection (MPI), where the global magnetization requires a further inspection step and succeeding demagnetization, the presented prototype only locally magnetize the surface area in the vicinity of the GMR Sensors. For the local magnetization, the applied sub-surface magnetic field was simulated and proofed for detecting flaws with a depth of a few 10 ?m. By multiplexing the sensor array with an adapted read out electronics we quasi simultaneously detect the normal field component of about 100?m above the surface. The detection of artificial notches with a depth of 40 ?m and more could be resolved with a SNR better than 20 dB. The presented testing facility is fast and provides a step towards automated testing of safety relevant steel components.

Pelkner, Matthias; Reimund, Verena; Erthner, Thomas; Panke, Nicolai; Kreutzbruck, Marc [BAM Federal Institute for Material Research and Testing, Unter den Eichen 87, 12205 Berlin (Germany)

2014-02-18T23:59:59.000Z

287

Development of an Inverse Algorithm for Resonance Inspection  

SciTech Connect (OSTI)

Resonance inspection (RI), which employs the natural frequency spectra shift between the good and the anomalous part populations to detect defects, is a non-destructive evaluation (NDE) technique with many advantages such as low inspection cost, high testing speed, and broad applicability to structures with complex geometry compared to other contemporary NDE methods. It has already been widely used in the automobile industry for quality inspections of safety critical parts. Unlike some conventionally used NDE methods, the current RI technology is unable to provide details, i.e. location, dimension, or types, of the flaws for the discrepant parts. Such limitation severely hinders its wide spread applications and further development. In this study, an inverse RI algorithm based on maximum correlation function is proposed to quantify the location and size of flaws for a discrepant part. A dog-bone shaped stainless steel sample with and without controlled flaws are used for algorithm development and validation. The results show that multiple flaws can be accurately pinpointed back using the algorithms developed, and the prediction accuracy decreases with increasing flaw numbers and decreasing distance between flaws.

Lai, Canhai; Xu, Wei; Sun, Xin

2012-10-01T23:59:59.000Z

288

RELIABLE RADIOGRAPHIC INSPECTION OF FLEXIBLE RISERS FOR THE OIL INDUSTRY  

SciTech Connect (OSTI)

Flexible risers are composite tubular structures manufactured by the concentric assemblage of cylindrical polymeric and helically wound metallic layers employed to convey pressurized fluids such as oil, gas and water in the ocean environment. The metallic layers account for the flexible risers' structural strength and are dimensioned according to the static and dynamic loads. They are usually installed in a free hanging catenary configuration and are subjected to the direct action of waves and marine currents and wave induced motions from the oil production platform. The fatigue rupture of wire armours in the end fitting or within the riser segment protected by the bend stiffener is an object of major concern. Integrity models have been developed, however inspection techniques are mandatory to ensure that failure is detected. Gammagraphy has been used as a common inspection technique in all regions of the flexible riser, mainly with the single wall-single view method. On the other side, there is not any qualified radiographic procedure to this kind of structure. Radiographic simulation was adopted and its validation with actual gammagraphies and establishment of radiographic parameters to complex radiation geometries were done. Results show the viability of the radiographic inspection analyzing the armour wires' rupture and the displacement between wires.

Almeida, Romulo M.; Rebello, Joao Marcos A. [Department of Metallurgical and Materials Engineering COPPE/UFRJ-Federal University of Rio de Janeiro P.O. Box 68505 CEP 21941-972, Rio de Janeiro RJ (Brazil); Vaz, Murilo A. [Department of Ocean Engineering-COPPE/UFRJ (Brazil)

2010-02-22T23:59:59.000Z

289

Condition Assessment Survey (CAS) Program. Deficiency standards and inspections methods manual: Volume 8, 0.08 Mechanical, Book 2  

SciTech Connect (OSTI)

Inspection methods presented for plumbing, fire protection, heating, cooling, and special items (drinking water cooling systems).

Not Available

1993-05-01T23:59:59.000Z

290

A Controlled Experiment to Assess the Effectiveness of Inspection Meetings Alessandro Bianchi, Filippo Lanubile, and Giuseppe Visaggio  

E-Print Network [OSTI]

inspection is a structured process for the static verification of software documents, including requirements the overall cost and total time of the inspection process, the need for a meeting of the whole inspection team for detecting and removing defects early in the software development process. In a software inspection, review

Lanubile, Filippo

291

Muddy Water? Variation in Reporting Receipt of Breast Cancer Radiation Therapy by Population-Based Tumor Registries  

SciTech Connect (OSTI)

Purpose: To evaluate, in the setting of breast cancer, the accuracy of registry radiation therapy (RT) coding compared with the gold standard of Medicare claims. Methods and Materials: Using Surveillance, Epidemiology, and End Results (SEER)Medicare data, we identified 73,077 patients aged ?66 years diagnosed with breast cancer in the period 2001-2007. Underascertainment (1 - sensitivity), sensitivity, specificity, ?, and ?{sup 2} were calculated for RT receipt determined by registry data versus claims. Multivariate logistic regression characterized patient, treatment, and geographic factors associated with underascertainment of RT. Findings in the SEERMedicare registries were compared with three non-SEER registries (Florida, New York, and Texas). Results: In the SEERMedicare registries, 41.6% (n=30,386) of patients received RT according to registry coding, versus 49.3% (n=36,047) according to Medicare claims (P<.001). Underascertainment of RT was more likely if patients resided in a newer SEER registry (odds ratio [OR] 1.70, 95% confidence interval [CI] 1.60-1.80; P<.001), rural county (OR 1.34, 95% CI 1.21-1.48; P<.001), or if RT was delayed (OR 1.006/day, 95% CI 1.006-1.007; P<.001). Underascertainment of RT receipt in SEER registries was 18.7% (95% CI 18.6-18.8%), compared with 44.3% (95% CI 44.0-44.5%) in non-SEER registries. Conclusions: Population-based tumor registries are highly variable in ascertainment of RT receipt and should be augmented with other data sources when evaluating quality of breast cancer care. Future work should identify opportunities for the radiation oncology community to partner with registries to improve accuracy of treatment data.

Walker, Gary V. [Department of Radiation Oncology, University of Texas MD Anderson Cancer Center, Houston, Texas (United States)] [Department of Radiation Oncology, University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Giordano, Sharon H. [Department of Breast Medical Oncology, University of Texas MD Anderson Cancer Center, Houston, Texas (United States)] [Department of Breast Medical Oncology, University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Williams, Melanie [Texas Cancer Registry, Department of State Health Services, Austin, Texas (United States)] [Texas Cancer Registry, Department of State Health Services, Austin, Texas (United States); Jiang, Jing [Division of Quantitative Sciences, University of Texas MD Anderson Cancer Center, Houston, Texas (United States)] [Division of Quantitative Sciences, University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Niu, Jiangong [Department of Breast Medical Oncology, University of Texas MD Anderson Cancer Center, Houston, Texas (United States)] [Department of Breast Medical Oncology, University of Texas MD Anderson Cancer Center, Houston, Texas (United States); MacKinnon, Jill; Anderson, Patricia; Wohler, Brad [Florida Cancer Data System, University of Miami School of Medicine, Miami, Florida (United States)] [Florida Cancer Data System, University of Miami School of Medicine, Miami, Florida (United States); Sinclair, Amber H.; Boscoe, Francis P.; Schymura, Maria J. [New York State Cancer Registry, New York State Department of Health, Albany, New York (United States)] [New York State Cancer Registry, New York State Department of Health, Albany, New York (United States); Buchholz, Thomas A. [Department of Radiation Oncology, University of Texas MD Anderson Cancer Center, Houston, Texas (United States)] [Department of Radiation Oncology, University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Smith, Benjamin D., E-mail: BSmith3@mdanderson.org [Department of Radiation Oncology, University of Texas MD Anderson Cancer Center, Houston, Texas (United States)

2013-07-15T23:59:59.000Z

292

Preparing for the Future  

E-Print Network [OSTI]

tx H2O | pg. 12 Preparing for the Future Story by Kathy Wythe Preparing for the Future University establishes water management degree program Texas A&M University launched an interdisci-plinary water management degree programduring the fall... 2005 semester with 12 stu-dents seeking either master?s or doctorate degrees in water management and hydrologic sciences. The degree program, the first in Texas, includes 42 faculty members in 12 departments from four differ- ent colleges, said Ron...

Wythe, Kathy

2006-01-01T23:59:59.000Z

293

Yeast Immunofluorescence Prepare Cells  

E-Print Network [OSTI]

slide. Resuspend in up to 250 µl SPC buffer to prepare up to 5 slides. #12;Prepare Slide: 11. Use clean 15-well slide(s). Start with 25 µl of 2 mg/ml poly-D-lysine (Sigma P-1024) per slide. Pipet on and then off, leaving a thin film on slide well. Hold at room temperature for 1 minute. Wash slide using

Aris, John P.

294

Post-Closure Inspection Report for Corrective Action Unit 92: Area 6 Decon Pond Facility  

SciTech Connect (OSTI)

This Post-Closure Inspection Report provides an analysis and summary of inspections for Corrective Action Unit (CAU) 92, Area 6 Decon Pond Facility. CAU 92 was closed according to the Resource Conservation and Recovery Act (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection [NDEP], 1995) and the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996; as amended January 2007). Closure activities were completed on February 16, 1999, and the Closure Report (U.S. Department of Energy, Nevada Operations Office, 1999) was approved and a Notice of Completion issued by NDEP on May 11, 1999. CAU 92 consists of two Corrective Action Sites (CASs): CAS 06-04-01, Decon Pad Oil/Water Separator, and CAS 06-05-02, Decontamination Pond (RCRA). Both CASs have use restrictions; however, only CAS 06-05-02 requires post-closure inspections. Visual inspections of the cover and fencing at CAS 06-05-02 are performed quarterly. Additional inspections are conducted if precipitation occurs in excess of 1.28 centimeters (cm) (0.50 inches [in.]) in a 24-hour period. This report covers calendar year 2007. Quarterly site inspections were performed in March, June, September, and December of 2007. All observations indicated the continued integrity of the unit. No issues or concerns were noted, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A of this report, and photographs taken during the site inspections are included in Appendix B of this report. Two additional inspections were performed after precipitation events that exceeded 1.28 cm (0.50 in.) within a 24-hour period during 2007. No significant changes in site conditions were noted during these inspections, and no corrective actions were necessary. A copy of the inspection checklists and field notes completed during these additional inspections are included in Appendix A. Precipitation records for 2007 are included in Appendix C.

NSTec Environmental Restoration

2008-03-01T23:59:59.000Z

295

Review: Preparing for Climate Change  

E-Print Network [OSTI]

Review: Preparing for Climate Change By Michael D.Stephen, Preparing for Climate Change. A Boston Review Book.alkaline paper. Climate change is inevitable, but disaster

Kunnas, Jan

2013-01-01T23:59:59.000Z

296

SEPARATION/TERMINATION CHECKLIST PROCEDURES This checklist should be initiated only by the home department and upon receipt of a written notice of resignation or termination.  

E-Print Network [OSTI]

SEPARATION/TERMINATION CHECKLIST PROCEDURES This checklist should be initiated only by the home department and upon receipt of a written notice of resignation or termination. The following procedures must be completed for all separating/terminating employees except students, grads and temporary hourly employees

Dyer, Bill

297

Apparatus for inspecting a group of containers and method of using same  

DOE Patents [OSTI]

An apparatus and method for inspecting a plurality of containers are provided. Each container has an outer surface for housing at least one material therein. The techniques provided involve at least one inspection vehicle and at least one detector. Each inspection vehicle has a plurality of wheels for movably positioning about the plurality of containers. The wheels may have at least one magnet for selectively adhering to the outer surface of at least one of the containers whereby the inspection vehicle traverses the container(s). The detector is positionable proximate at least one of the containers. The detector may be deployable from the inspection vehicle to a position adjacent the container(s). The detector has at least one sensor for measuring at least one characteristic of the plurality of containers. At least one base station may be provided for communicating with the inspection vehicle(s) and/or detector(s).

Lee, Jr., James H. (Edgewood, NM); Salton, Jonathan R. (Albuquerque, NM); Spletzer, Barry L. (Albuquerque, NM)

2012-02-28T23:59:59.000Z

298

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2012  

SciTech Connect (OSTI)

This report summarizes the 2012 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. A revised plan is in preparation. The Long-Term Surveillance Plan for the Salmon, Mississippi, Site is intended for release in 2013. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi The State of Mississippi owns the surface real estate subject to certain restrictions related to subsurface penetration. The State is the surface operator; the Mississippi Forestry Commission is its agent. The federal government owns the subsurface real estate (including minerals and some surface features), shares right-of-entry easements with the State, and retains rights related to subsurface monitoring. The U.S. Department of Energy (DOE) Office of Legacy Management (LM), a successor agency to the U.S. Atomic Energy Commission, is responsible for the long-term surveillance of the subsurface real estate

None

2013-03-01T23:59:59.000Z

299

On the approximation of crack shapes found during inservice inspection  

SciTech Connect (OSTI)

This paper addresses the characterization of axial internal flaw found during inservice inspection of a pipe. J-integral distribution for various flaw shapes is obtained using line spring finite, element method. The peak J-value and its distribution across the crack is found to be characteristic feature of each shape. The triangular shape yields peak J-value away from the center, the point of depth. The elliptic approximation results in large overestimate of J-value for unsymmetric flaws. Triangular approximation is recommended for such flaws so that further service can be obtained from the component.

Bhate, S.R.; Chawla, D.S.; Kushwaha, H.S. [Bhabha Atomic Research Centre, Bombay (India)] [and others

1997-04-01T23:59:59.000Z

300

Inspection Report: DOE/IG-0935 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecemberInitiatives Initiatives Through a variety of cross-cuttingReport5 Inspection

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Independent Oversight Inspection, Nevada Test Site - June 2007 | Department  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartment ofThe fullTreatment andof Energy 7 Inspection of

302

Independent Oversight Inspection, Pantex Plant - June 2008 | Department of  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartment ofThe fullTreatment andof Energy 7 Inspection

303

Independent Oversight Inspection, Sandia National Laboratories - July 2006  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartment ofThe fullTreatment andof Energy 7 Inspection|

304

Planned Audits and Inspections FY 2013 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15, 2010Energy6 Frontera STAT.PaulThePlanned Audits and Inspections

305

Inspection Report: S95IS017 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report:0-02

306

Inspection, Kansas City Plant - May 2004 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report:0-029IS019 REPORT

307

Uranium at Y-12: Inspection | Y-12 National Security Complex  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered energy consumption by sectorlongUpdates by Diane Johnson9.Inspection Uranium at

308

Sandia National Laboratories: investigate wind blade inspection methods  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1developmentturbine blade manufacturing therenewableswind blade inspection methods

309

E-Print Network 3.0 - advanced inspection technology Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to evaluate enhanced visual inspection technology that could be deployed... from the perspective of evaluating technology prospects for automated ... Source: Siegel, Mel -...

310

E-Print Network 3.0 - automatic laser inspection Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Materials Processing Using Diode-Pumped Solid- Summary: semiconductor scribing, glass marking, inspection 12;17 Applications of mode-locked lasers Wave length nm... - 100 MHz...

311

area follow-up inspection: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

with specific emphasis on aircraft windscreens and canopies. Caveats and lessons learned from experience are included to assist authors in writing tailored inspection...

312

E-Print Network 3.0 - automated visual inspection Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Collection: Computer Technologies and Information Sciences 25 Proceedings of ICIAP 1999, Venice, Italy pp. 1218-1225 Inspection By Implicit Polynomials Summary: . Chin and Harlow...

313

E-Print Network 3.0 - automatic visual inspection Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Collection: Computer Technologies and Information Sciences 35 Proceedings of ICIAP 1999, Venice, Italy pp. 1218-1225 Inspection By Implicit Polynomials Summary: to automatically...

314

Final Site-Specific Decommissioning Inspection Report for the University of Washington Research and Test Reactor  

SciTech Connect (OSTI)

Report of site-specific decommissioning in-process inspection activities at the University of Washington Research and Test Reactor Facility.

Sarah Roberts

2006-10-18T23:59:59.000Z

315

POST CLOSURE INSPECTION AND MONITORING REPORT FOR CORRECTIVE ACTION UNIT 417: CENTRAL NEVADA TEST AREA - SURFACE, HOT CREEK VALLEY, NEVADA, FOR CALENDAR YEAR 2004  

SciTech Connect (OSTI)

This post-closure inspection and monitoring report has been prepared according to the stipulations laid out in the Closure Report (CR) for Corrective Action Unit (CAU) 417, Central Nevada Test Area (CNTA)--Surface (U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office [NNSA/NV], 2001), and the Federal Facility Agreement and Consent Order (FFACO, 1996). This report provides an analysis and summary of site inspections, subsidence surveys, meteorological information, and soil moisture monitoring data for CAU 417, which is located in Hot Creek Valley, Nye County, Nevada. This report covers Calendar Year 2004. Inspections at CAU 417 are conducted quarterly to document the physical condition of the UC-1, UC-3, and UC-4 soil covers, monuments, signs, fencing, and use restricted areas. The physical condition of fencing, monuments, and signs is noted, and any unusual conditions that could impact the integrity of the covers are reported. The objective of the soil moisture monitoring program is to monitor the stability of soil moisture conditions within the upper 1.2 meters (m) (4 feet [ft]) of the UC-1 Central Mud Pit (CMP) cover and detect changes that may be indicative of moisture movement exceeding the cover design performance expectations.

BECHTEL NEVADA; NNSA NEVADA SITE OFFICE

2005-04-01T23:59:59.000Z

316

Preparation of vinyl acetate  

DOE Patents [OSTI]

This invention pertains to the preparation of vinyl acetate by contacting a mixture of hydrogen and ketene with a heterogeneous catalyst containing a transition metal to produce acetaldehyde, which is then reacted with ketene in the presence of an acid catalyst to produce vinyl acetate.

Tustin, Gerald Charles (Kingsport, TN); Zoeller, Joseph Robert (Kingsport, TN); Depew, Leslie Sharon (Kingsport, TN)

1998-01-01T23:59:59.000Z

317

Preparation of vinyl acetate  

DOE Patents [OSTI]

This invention pertains to the preparation of vinyl acetate by contacting a mixture of hydrogen and ketene with a heterogeneous catalyst containing a transition metal to produce acetaldehyde, which is then reacted with ketene in the presence of an acid catalyst to produce vinyl acetate.

Tustin, G.C.; Zoeller, J.R.; Depew, L.S.

1998-03-24T23:59:59.000Z

318

CAREER FAIR PREPARATION &  

E-Print Network [OSTI]

, NJ #12;BEFORE THE CAREER FAIR · Prepare A Resume Create a resume using the "RBS Undergraduate New Brunswick Student Handbook" as a guide Have your resume reviewed by a Career Counselor Upload resume to Symplicity - RBS Undergraduate Office New Brunswick's career portal system Print plenty copies of your resume

Lin, Xiaodong

319

Apparatus for moving a pipe inspection probe through piping  

DOE Patents [OSTI]

A method and apparatus for controllably moving devices for cleaning or inspection through piping systems, including piping systems with numerous piping bends therein, by using hydrostatic pressure of a working fluid introduced into the piping system. The apparatus comprises a reservoir or other source for supplying the working fluid to the piping system, a launch tube for admitting the device into the launcher and a reversible, positive displacement pump for controlling the direction and flow rate of the working fluid. The device introduced into the piping system moves with the flow of the working fluid through the piping system. The launcher attaches to the valved ends of a piping system so that fluids in the piping system can recirculate in a closed loop. The method comprises attaching the launcher to the piping system, supplying the launcher with working fluid, admitting the device into the launcher, pumping the working fluid in the direction and at the rate desired so that the device moves through the piping system for pipe cleaning or inspection, removing the device from the launcher, and collecting the working fluid contained in the launcher.

Zollinger, W. Thor (Martinez, GA); Appel, D. Keith (Aiken, SC); Lewis, Gregory W. (North Augusta, SC)

1995-01-01T23:59:59.000Z

320

Natural Gas Vehicle Cylinder Safety, Training and Inspection Project  

SciTech Connect (OSTI)

Under the auspices of the National Energy Technology Laboratory and the US Department of Energy, the Clean Vehicle Education Foundation conducted a three-year program to increase the understanding of the safe and proper use and maintenance of vehicular compressed natural gas (CNG) fuel systems. High-pressure fuel systems require periodic inspection and maintenance to insure safe and proper operation. The project addressed the needs of CNG fuel containers (cylinders) and associated high-pressure fuel system components related to existing law, codes and standards (C&S), available training and inspection programs, and assured coordination among vehicle users, public safety officials, fueling station operators and training providers. The program included a public and industry awareness campaign, establishment and administration of a cylinder inspector certification training scholarship program, evaluation of current safety training and testing practices, monitoring and investigation of CNG vehicle incidents, evaluation of a cylinder recertification program and the migration of CNG vehicle safety knowledge to the nascent hydrogen vehicle community.

Hank Seiff

2008-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Nondestructive inspection of the condition of oil pipeline cleaning units  

SciTech Connect (OSTI)

One of the reasons for shutdowns of main oil pipelines is stoppage of the cleaning unit in cleaning of the inner surface of paraffin deposits caused by damage to the cleaning unit. The authors propose a method of searching for and determining the condition of the cleaning unit not requiring dismantling of the pipeline according to which the initial search for the cleaning unit is done with acoustic instruments (the increased acoustic noise at the point of stoppage of its is recorded) and subsequent inspection by a radiographic method. An experimental model of an instrument was developed making it possible to determine the location of a cleaning unit in an oil pipeline in stoppage of it from the acoustic noise. The instrument consists of two blocks, the remote sensor and the indicator block, which are connected to each other with a cable up to 10 m long. The design makes it possible to place the sensor at any accessible point of a linear part of the pipeline (in a pit, on a valve, etc.) while the indicator block may remain on the surface of the ground. The results obtained make it possible to adopt the optimum solutions on elimination of their malfunctioning and to prevent emergency situations without dismantling of the pipeline. With the equipment developed it is possible to inspect oil and gas pipelines with different reasons for a reduction in their throughput.

Berdonosov, V.A.; Boiko, D.A.; Lapshin, B.M.; Chakhlov, V.L.

1989-02-01T23:59:59.000Z

322

Apparatus for moving a pipe inspection probe through piping  

DOE Patents [OSTI]

A method and apparatus are disclosed for controllably moving devices for cleaning or inspection through piping systems, including piping systems with numerous piping bends therein, by using hydrostatic pressure of a working fluid introduced into the piping system. The apparatus comprises a reservoir or other source for supplying the working fluid to the piping system, a launch tube for admitting the device into the launcher and a reversible, positive displacement pump for controlling the direction and flow rate of the working fluid. The device introduced into the piping system moves with the flow of the working fluid through the piping system. The launcher attaches to the valved ends of a piping system so that fluids in the piping system can recirculate in a closed loop. The method comprises attaching the launcher to the piping system, supplying the launcher with working fluid, admitting the device into the launcher, pumping the working fluid in the direction and at the rate desired so that the device moves through the piping system for pipe cleaning or inspection, removing the device from the launcher, and collecting the working fluid contained in the launcher. 8 figs.

Zollinger, W.T.; Appel, D.K.; Lewis, G.W.

1995-07-18T23:59:59.000Z

323

Method of non-destructively inspecting a curved wall portion  

DOE Patents [OSTI]

A method of non-destructively inspecting a curved wall portion of a large and thick walled vessel for a defect by computed tomography is provided. A collimated source of radiation is placed adjacent one side of the wall portion and an array of detectors for the radiation is placed on the other side adjacent the source. The radiation from the source passing through the wall portion is then detected with the detectors over a limited angle, dependent upon the curvature of the wall of the vessel, to obtain a dataset. The source and array are then coordinately moved relative to the wall portion in steps and a further dataset is obtained at each step. The plurality of datasets obtained over the limited angle is then processed to produce a tomogram of the wall portion to determine the presence of a defect therein. In a preferred embodiment, the curved wall portion has a center of curvature so that the source and the array are positioned at each step along a respective arc curved about the center. If desired, the detector array and source can be reoriented relative to a new wall portion and an inspection of the new wall portion can be easily obtained. Further, the source and detector array can be indexed in a direction perpendicular to a plane including the limited angle in a plurality of steps so that by repeating the detecting and moving steps at each index step, a three dimensional image can be created of the wall portion.

Fong, James T. (Bethel Park, PA)

1996-01-01T23:59:59.000Z

324

Second Annual Maintenance, Inspection, and Test Report for PAS-1 Cask Certification for Shipping Payload B  

SciTech Connect (OSTI)

The Nuclear Packaging, Inc. (NuPac), PAS-1 cask is required to undergo annual maintenance and inspections to retain certification in accordance with U.S. Department of Energy (DOE) Certificate of Compliance USA/9184B(U) (Appendix A). The packaging configuration being tested and maintained is the NuPac PAS-1 cask for Payload B. The intent of the maintenance and inspections is to ensure the packaging remains in unimpaired physical condition. Two casks, serial numbers 2162-026 and 2162-027, were maintained, inspected, and tested at the 306E Development, Fabrication, and Test Laboratory, located at the Hanford Site's 300 Area. Waste Management Federal Services, Inc. (WMFS), a subsidiary of GTS Duratek, was in charge of the maintenance and testing. Cogema Engineering Corporation (Cogema) directed the operations in the test facility. The maintenance, testing, and inspections were conducted successfully with both PAS-1 casks. The work conducted on the overpacks included weighing, gasket replacement, and plastic pipe plug and foam inspections. The work conducted on the secondary containment vessel (SCV) consisted of visual inspection of the vessel and threaded parts (i.e., fasteners), visual inspection of sealing surfaces, replacement of O-ring seals, and a helium leak test. The work conducted on the primary containment vessel (PCV) consisted of visual inspection of the vessel and threaded parts (i.e., fasteners), visual inspection of sealing surfaces, replacement of O-ring seals, dimensional inspection of the vessel bottom, a helium leak test, and dye penetrant inspection of the welds. The vermiculite material used in the cask rack assembly was replaced.

KELLY, D.J.

2000-10-09T23:59:59.000Z

325

2012 Groundwater Monitoring and Inspection Report Gnome-Coach, New Mexico, Site  

SciTech Connect (OSTI)

Gnome-Coach was the site of a 3-kiloton underground nuclear test conducted in 1961. Surface and subsurface contamination resulted from the underground nuclear testing, post-test drilling, and a groundwater tracer test performed at the site. Surface reclamation and remediation began after the underground testing. A Completion Report was prepared, and the State of New Mexico is currently proceeding with a conditional certificate of completion for the surface. Subsurface corrective action activities began in 1972 and have generally consisted of annual sampling and monitoring of wells near the site. In 2008, the annual site inspections were refined to include hydraulic head monitoring and collection of samples from groundwater monitoring wells onsite using the low-flow sampling method. These activities were conducted during this monitoring period on January 18, 2012. Analytical results from this sampling event indicate that concentrations of tritium, strontium-90, and cesium-137 were generally consistent with concentrations from historical sampling events. The exceptions are the decreases in concentrations of strontium-90 in samples from wells USGS-4 and USGS-8, which were more than 2.5 times lower than last year's results. Well USGS-1 provides water for livestock belonging to area ranchers, and a dedicated submersible pump cycles on and off to maintain a constant volume in a nearby water tank. Water levels in wells USGS-4 and USGS-8 respond to the on/off cycling of the water supply pumping from well USGS-1. Well LRL-7 was not sampled in January, and water levels were still increasing when the transducer data were downloaded in September. A seismic reflection survey was also conducted this year. The survey acquired approximately 13.9 miles of seismic reflection data along 7 profiles on and near the site. These activities were conducted from February 23 through March 10, 2012. The site roads, monitoring well heads, and the monument at surface ground zero were in good condition at the time of the site inspection. However, it was reported in September 2012 that the USGS-1 well head had been damaged by a water truck in April 2012.

None

2013-03-01T23:59:59.000Z

326

CARRIER PREPARATION BUILDING MATERIALS HANDLING SYSTEM DESCRIPTION DOCUMENT  

SciTech Connect (OSTI)

The Carrier Preparation Building Materials Handling System receives rail and truck shipping casks from the Carrier/Cask Transport System, and inspects and prepares the shipping casks for return to the Carrier/Cask Transport System. Carrier preparation operations for carriers/casks received at the surface repository include performing a radiation survey of the carrier and cask, removing/retracting the personnel barrier, measuring the cask temperature, removing/retracting the impact limiters, removing the cask tie-downs (if any), and installing the cask trunnions (if any). The shipping operations for carriers/casks leaving the surface repository include removing the cask trunnions (if any), installing the cask tie-downs (if any), installing the impact limiters, performing a radiation survey of the cask, and installing the personnel barrier. There are four parallel carrier/cask preparation lines installed in the Carrier Preparation Building with two preparation bays in each line, each of which can accommodate carrier/cask shipping and receiving. The lines are operated concurrently to handle the waste shipping throughputs and to allow system maintenance operations. One remotely operated overhead bridge crane and one remotely operated manipulator is provided for each pair of carrier/cask preparation lines servicing four preparation bays. Remotely operated support equipment includes a manipulator and tooling and fixtures for removing and installing personnel barriers, impact limiters, cask trunnions, and cask tie-downs. Remote handling equipment is designed to facilitate maintenance, dose reduction, and replacement of interchangeable components where appropriate. Semi-automatic, manual, and backup control methods support normal, abnormal, and recovery operations. Laydown areas and equipment are included as required for transportation system components (e.g., personnel barriers and impact limiters), fixtures, and tooling to support abnormal and recovery operations. The Carrier Preparation Building Materials Handling System interfaces with the Cask/Carrier Transport System to move the carriers to and from the system. The Carrier Preparation Building System houses the equipment and provides the facility, utility, safety, communications, and auxiliary systems supporting operations and protecting personnel.

E.F. Loros

2000-06-28T23:59:59.000Z

327

Program for the Inspection of Nickel Alloy Components Report from the Programs Steering Committee: Inspection of Bottom-Mounted Instrumentation Nozzles Round Robin  

SciTech Connect (OSTI)

The U.S. Nuclear Regulatory Commission (NRC) executed agreements with organizations in Japan, Sweden, South Korea, Finland, and the United States to establish the Program for the Inspection of Nickel Alloy Components (PINC).

Cumblidge, Stephen E.; Heasler, Patrick G.; Doctor, Steven R.; Taylor, Theodore T.

2009-11-13T23:59:59.000Z

328

TORIS Data Preparation Guidelines  

SciTech Connect (OSTI)

The objective of this manual is to present guidelines and procedures for the preparation of new data for the Tertiary Oil Recovery Information System (TORIS) data base. TORIS is an analytical system currently maintained by the Department of Energy's (DOE) Bartlesville Project Office. It uses an extensive field- and reservoir-level data base to evaluate the technical and economic recovery potential of specific crude oil reservoirs.

Guinn, H.; Remson, D.

1999-03-11T23:59:59.000Z

329

Preparing for the Unexpected  

E-Print Network [OSTI]

for leaks before continuing service. Inventory ? Account for all livestock, fuels, chemicals, machinery and equipment. Compare this list to the inventory prepared before the incident. 1#24; ? Note any lost livestock, and report to emergency response... the crisis and rely on the public to follow instructions and react quickly. To know exactly what to do if a disaster occurs, you will need to monitor TV, radio or on-line news reports for official news. The health department, county emergency management...

Harris, Janie; Norman, Lisa; Lesikar, Bruce J.; Smith, David

2007-03-26T23:59:59.000Z

330

Walking and Climbing Service Robots for Safety Inspection of Nuclear Reactor Pressure Vessels  

E-Print Network [OSTI]

Walking and Climbing Service Robots for Safety Inspection of Nuclear Reactor Pressure Vessels B of Electronics and Computer Science, University of Southampton, Southampton, UK Abstract: Nuclear reactor and the usefulness of these robots for improving safety inspection of nuclear reactors in general are discussed

Chen, Sheng

331

Applied Ergonomics 33 (2002) 559570 Using virtual reality technology for aircraft visual inspection training  

E-Print Network [OSTI]

inspection and maintenance, essential to safe, reliable air transportation, is a complex system with many maintenance system. However, inspection tends to be less than 100% reliable because of human fallibility (Chin Engineering, Clemson University, Clemson, SC 29634, USA c NASA Ames Research Center, USA Received 10 May 2001

Duchowski, Andrew T.

332

Fire Alarm Testing and Inspection Planning and Vendor Check In/Check Out Process  

E-Print Network [OSTI]

Fire Alarm Testing and Inspection Planning and Vendor Check In/Check Out Process DOCUMENT PURPOSE This process is used for fire alarm testing and inspection pre-work planning and vendor check in and check out. BUILDING NAME/#: ___________________/_____ VENDOR: ________________________ TECHNICIAN

Webb, Peter

333

The Effects of Eye Movements on Visual Inspection Performance Mohammad T. Khasawneh1  

E-Print Network [OSTI]

1 The Effects of Eye Movements on Visual Inspection Performance Mohammad T. Khasawneh1 , Sittichai the search portion. Eye-tracking technology is a very useful tool in capturing information about the eye movements in relation to visual inspection parameters. To investigate the effect of eye movements

Duchowski, Andrew T.

334

Surface Shape Description of 3D Data from Under Vehicle Inspection Robot  

E-Print Network [OSTI]

Surface Shape Description of 3D Data from Under Vehicle Inspection Robot Sreenivas R. Sukumar1 capabilities to a multi-modal under vehicle inspection robot. In this paper, we outline the various design challenges towards the automation of the 3D scene modeling task. We employ laser-based range imaging

Abidi, Mongi A.

335

Abstract--This paper presents novel Global Navigation Satellite System (GNSS)-based flight inspection systems  

E-Print Network [OSTI]

inspection systems (FIS) that outperform current flight inspection systems in terms of cost, efficiency, and integrity. The GNSS-based FIS are the WAAS-based FIS and the stand-alone GPS-based FIS. These GNSS-based FIS are onboard and do not use an INS or external reference stations at the airport. Instead, the WAAS-based FIS

Stanford University

336

Inspection of Environment, Safety, and Health Programs at the Savannah River Site, February 2006  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE) Office of Independent Oversight (Independent Oversight) conducted an inspection of environment, safety, and health (ES&H) programs at the DOE Savannah River Site (SRS) during January and February 2006. The inspection was performed by Independent Oversights Office of Environment, Safety and Health Evaluations.

337

ULTRASONIC ARRAY TECHNIQUE FOR THE INSPECTION OF COPPER LINED CANISTERS FOR NUCLEAR WASTE FUEL  

E-Print Network [OSTI]

ULTRASONIC ARRAY TECHNIQUE FOR THE INSPECTION OF COPPER LINED CANISTERS FOR NUCLEAR WASTE FUEL and Waste Management Co.) for encapsulation of nuclear waste. Due to the radiation emitted by the nuclear, and characterization. The applicability of linear array technique for inspection of copper lined canisters for nuclear

338

SWAMI: An Autonomous Mobile Robot for Inspection of Nuclear Waste Storage Facilities  

E-Print Network [OSTI]

SWAMI: An Autonomous Mobile Robot for Inspection of Nuclear Waste Storage Facilities Ron Fulbright Inspector (SWAMI) is a prototype mobile robot designed to perform autonomous inspection of nuclear waste user interface building tool called UIM/X. Introduction Safe disposal of nuclear waste is a difficult

Stephens, Larry M.

339

Documentation for first annual testing and inspections of Benificial Uses Shipping System (BUSS) Cask  

SciTech Connect (OSTI)

The purpose of this report is to compile date generated during the first annual tests and inspections of the Benificiai Uses Shipping System (BUSS) Cask. In addition, this report will verify that the testing criteria identified in chapter 8 of the BUSS Cask Safety Analysis Report for Packaging (SARP) was met. Section 8.2 ``Maintenance and Periodic Inspection Program`` of the BUSS Cask SARP requires that the following tests and inspections be performed on an annual basis: Hydrostatic pressure test; helium leak test; dye penetrant test on the trunnions and lifting lugs; and torque test on all bolts; impact limiter inspection and weight test. The first annual inspections and testing of the BUSS Cask were completed on May 5, 1994, and met the SARP criteria.

Lundeen, J.E.

1994-08-23T23:59:59.000Z

340

Ultrasonic probe deployment device for increased wave transmission and rapid area scan inspections  

DOE Patents [OSTI]

An ultrasonic probe deployment device in which an ultrasound-transmitting liquid forms the portion of the ultrasonic wave path in contact with the surface being inspected (i.e., the inspection surface). A seal constrains flow of the liquid, for example preventing the liquid from surging out and flooding the inspection surface. The seal is not rigid and conforms to variations in the shape and unevenness of the inspection surface, thus forming a seal (although possibly a leaky seal) around the liquid. The probe preferably is held in place to produce optimum ultrasonic focus on the area of interest. Use of encoders can facilitate the production of C-scan area maps of the material being inspected.

DiMambro, Joseph; Roach, Dennis P; Rackow, Kirk A; Nelson, Ciji L; Dasch, Cameron J; Moore, David G

2013-02-12T23:59:59.000Z

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Ultrasonic probe deployment device for increased wave transmission and rapid area scan inspections  

SciTech Connect (OSTI)

An ultrasonic probe deployment device in which an ultrasound-transmitting liquid forms the portion of the ultrasonic wave path in contact with the surface being inspected (i.e., the inspection surface). A seal constrains flow of the liquid, for example preventing the liquid from surging out and flooding the inspection surface. The seal is not rigid and conforms to variations in the shape and unevenness of the inspection surface, thus forming a seal (although possibly a leaky seal) around the liquid. The probe preferably is held in place to produce optimum ultrasonic focus on the area of interest. Use of encoders can facilitate the production of C-scan area maps of the material being inspected.

DiMambro, Joseph (Placitas, NM); Roach, Dennis P. (Albuquerque, NM); Rackow, Kirk A. (Albuquerque, NM); Nelson, Ciji L. (Albuquerque, NM); Dasch, Cameron J. (Boomfield Hills, MI); Moore, David G. (Albuquerque, NM)

2012-01-03T23:59:59.000Z

342

Final Report - Gas Retention and Release Tests Supporting the Concentrate Receipt Vessel (CRV-VSL-00002A/2B) Configuration  

SciTech Connect (OSTI)

Gas Retention and Release (GR and R) tests were performed in the scaled Concentrate Receipt Vessel (CRV) Test Stand at the Savannah River National Laboratory to validate the capability of candidate Hybrid-Mixing systems for the CRV to safely release hydrogen during normal and upset conditions. Hydrogen is generated in the radioactive waste as a result of natural and plant processes and must not be allowed to accumulate above flammability limits. Two types of tests were conducted. Gas holdup tests determined the steady state amount of gas accumulated in the simulant under normal PJM only or PJM plus sparging conditions. Gas release tests determined what operating conditions are necessary to fully release gas after a steady state gas fraction of 4 per cent tank volume or more was reached in the simulant.

GUERRERO, HECTOR

2004-09-01T23:59:59.000Z

343

FINAL REPORT - HYBRID-MIXING TESTS SUPPORTING THE CONCENTRATE RECEIPT VESSEL (CRV-VSL-00002A/2B) CONFIGURATION  

SciTech Connect (OSTI)

The Savannah River National Laboratory (SRNL) has performed scaled physical modeling of Pulse Jet Mixing Systems applicable to the Concentrate Receipt Vessel (CRV) of Hanford's Waste Treatment Plant (WTP) as part of the overall effort to validate pulse jet mixer (PJM) mixing in WTP vessels containing non-Newtonian fluids. The strategy developed by the Pulse Jet Mixing Task Team was to construct a quarter-scale model of the CRV, use a clear simulant to understand PJM mixing behavior, and down-select from a number of PJM configurations to a ''best design'' configuration. This ''best design'' would undergo final validation testing using a particulate simulant that has rheological properties closely similar to WTP waste streams. The scaled PJM mixing tests were to provide information on the operating parameters critical for the uniform movement (total mobilization) of these non-Newtonian slurries. Overall, 107 tests were performed during Phase I and Phase II testing.

GUERRERO, HECTORN.

2004-09-01T23:59:59.000Z

344

Addressing equipment set-up time and manufacturing cost through real time inline inspection in tantalum wire manufacturing  

E-Print Network [OSTI]

For this study, a novel wire inspection system was developed to detect surface defects and monitor diameter real-time during the final wire drawing operation. Throughout his work, it was proven that the new inspection ...

Gonzlez, Carlos A. (Carlos Alberto), 1972-

2004-01-01T23:59:59.000Z

345

The Use and Benefits of Video Inspection in Lined and Unlined Ductwork in IAQ Surveys and "Source Removal" Cleaning Projects  

E-Print Network [OSTI]

New technology has developed video equipment capable of inspecting interior lined and unlined ductwork. Where IAQ (Indoor Air Quality) questions require inspections of suspicious air conveyance systems. Video recordings provide useful information...

Kiec, T. M.

346

Thermal oxidation procedure PREPARATION........................................................................................................................................... 2  

E-Print Network [OSTI]

procedure - 2 - Preparation. The preparation procedure sets up the power, gas supplies, cooling water, (DI to check all the supplies. Cooling water Gas supplies Routing DI water for wet oxidation We start........................................................................................................................................... 2 Step 1 Turn on the cooling water

Hochberg, Michael

347

Advanced In-Service Inspection Approaches Applied to the Phenix Fast Breeder Reactor  

SciTech Connect (OSTI)

The safety upgrading of the Phenix plant undertaken between 1994 and 1997 involved a vast inspection programme of the reactor, the external storage drum and the secondary sodium circuits in order to meet the requirements of the defence-in-depth safety approach. The three lines of defence were analysed for every safety related component: demonstration of the quality of design and construction, appropriate in-service inspection and controlling the consequences of an accident. The in-service reactor block inspection programme consisted in controlling the core support structures and the high-temperature elements. Despite the fact that limited consideration had been given to inspection constraints during the design stage of the reactor in the 1960's, as compared to more recent reactor projects such as the European Fast Reactor (EFR), all the core support line elements were able to be inspected. The three following main operations are described: Ultrasonic inspection of the upper hangers of the main vessel, using small transducers able to withstand temperatures of 130 deg. C, Inspection of the conical shell supporting the core dia-grid. A specific ultrasonic method and a special implementation technique were used to control the under sodium structure welds, located up to several meters away from the scan surface. Remote inspection of the hot pool structures, particularly the core cover plug after partial sodium drainage of the reactor vessel. Other inspections are also summarized: control of secondary sodium circuit piping, intermediate heat exchangers, primary sodium pumps, steam generator units and external storage drum. The pool type reactor concept, developed in France since the 1960's, presents several favourable safety and operational features. The feedback from the Phenix plant also shows real potential for in-service inspection. The design of future generation IV sodium fast reactors will benefit from the experience acquired from the Phenix plant. (authors)

Guidez, J.; Martin, L. [Commissariat a l'Energie Atomique - CEA (France); Dupraz, R. [AREVA NP (France)

2006-07-01T23:59:59.000Z

348

Smart Onboard Inspection of High Pressure Gas Fuel Cylinders  

SciTech Connect (OSTI)

The use of natural gas as an alternative fuel in automotive applications is not widespread primarily because of the high cost and durability of the composite storage tanks. Tanks manufactured using carbon fiber are desirable in weight critical passenger vehicles because of the low density of carbon fiber. The high strength of carbon fiber also translates to a weight reduction because thinner wall designs are possible to withstand the internal pressure loads. However, carbon fiber composites are prone to impact damage that over the life of the storage tank may lead to an unsafe condition for the vehicle operator. A technique that potentially may be a reliable indication of developing hazardous conditions in composite fuel tanks is imbedded fiber optics. The applicability of this technique to onboard inspection is discussed and results from preliminary lab testing indicate that fiber optic sensors can reliably detect impact damage.

Beshears, D.L.; Starbuck, J.M.

1999-09-27T23:59:59.000Z

349

Systems for detecting charged particles in object inspection  

DOE Patents [OSTI]

Techniques, apparatus and systems for detecting particles such as muons. In one implementation, a monitoring system has a cosmic ray-produced charged particle tracker with a plurality of drift cells. The drift cells, which can be for example aluminum drift tubes, can be arranged at least above and below a volume to be scanned to thereby track incoming and outgoing charged particles, such as cosmic ray-produced muons, while also detecting gamma rays. The system can selectively detect devices or materials, such as iron, lead, gold and/or tungsten, occupying the volume from multiple scattering of the charged particles passing through the volume and can also detect any radioactive sources occupying the volume from gamma rays emitted therefrom. If necessary, the drift tubes can be sealed to eliminate the need for a gas handling system. The system can be employed to inspect occupied vehicles at border crossings for nuclear threat objects.

Morris, Christopher L.; Makela, Mark F.

2013-08-20T23:59:59.000Z

350

Method and apparatus for inspecting reflection masks for defects  

DOE Patents [OSTI]

An at-wavelength system for extreme ultraviolet lithography mask blank defect detection is provided. When a focused beam of wavelength 13 nm is incident on a defective region of a mask blank, three possible phenomena can occur. The defect will induce an intensity reduction in the specularly reflected beam, scatter incoming photons into an off-specular direction, and change the amplitude and phase of the electric field at the surface which can be monitored through the change in the photoemission current. The magnitude of these changes will depend on the incident beam size, and the nature, extent and size of the defect. Inspection of the mask blank is performed by scanning the mask blank with 13 nm light focused to a spot a few .mu.m in diameter, while measuring the reflected beam intensity (bright field detection), the scattered beam intensity (dark-field detection) and/or the change in the photoemission current.

Bokor, Jeffrey (Oakland, CA); Lin, Yun (Berkeley, CA)

2003-04-29T23:59:59.000Z

351

Acoustic Inspection and Analysis of Liquids in Sealed Containers  

SciTech Connect (OSTI)

This article describes the Acoustic Inspection Device (AID) developed by PNNL which uses acoustic to determine the contents and fill level of sealed containers. AID is a power drill shaped battery operated device fitted with a transducer that sends an ultrasonic pusle through a container of liquid and measure the return echo. The device compares the echo velocity and attnuation and compares that data to a materials database in an Palm Pilot vlecored to the top of the device to give the operator a text identification of the substance with 5 seconds. The device is sensitive enough to distinguish coke from diet coke and and can distinguish subtances at a variety of temperatures ranging from below freezing to over 100degreesF. PNNL won an R&D 100 award for the technology in 2003.

Diaz, Aaron A.

2003-12-01T23:59:59.000Z

352

Inspection of the Secretary of Energy`s foreign travel  

SciTech Connect (OSTI)

On December 9, 1995, the Secretary of Energy requested that the Department`s Inspector General (IG) conduct a thorough examination of all Secretarial foreign travel from 1993 to December 1995 to include the purpose of each trip, the activities of each Federal participant in each trip, the funding of each trip, and claims for reimbursements for expenses by Federal trip participants. The Secretary also requested that the review include an assessment of travel authorization, voucher, traveler reimbursement, and auditing systems employed by the Department to identify steps that could be taken to reduce errors and improve accounting oversight. Additionally, the Secretary requested that the Inspector General conduct a thorough examination of the establishment and filling of the Department`s Ombudsman position. The Office of Inspector General (OIG) initiated a review into these matters and assigned primary responsibility for the review to the Office of Inspections. The purpose of this inspection was to conduct a thorough examination of the 16 Secretarial foreign trips from June 1993 to December 1995. This report focuses on the four trade missions because of their extent and cost. We examined a number of Departmental management systems and processes involved in planning and executing the 16 foreign trips. To determine the actual cost of the 16 trips, it was necessary to determine who participated in the trips and to identify the individual travel costs. We were required to perform extensive reviews of records and conduct a large number of interviews because the Department could not provide any specific documents that could accurately account for who actually participated on the 16 trips. Having identified who participated, it was then necessary to examine key aspects of the Department`s management systems. Our report contains 31 recommendations for corrective action.

NONE

1996-10-07T23:59:59.000Z

353

Post-Closure Inspection Letter Report for Corrective Action Units (CAUs) on the Nevada National Security Site (NNSS)  

SciTech Connect (OSTI)

This letter serves as the post-closure inspection letter report for CAUs on the NNSS for Calendar Year 2011

NSTec Environmental Restoration

2012-05-16T23:59:59.000Z

354

Surface preparation and plating  

SciTech Connect (OSTI)

This chapter covers electroplating and electroless nickel plating since coatings of this type play an important role in diamond turning technology. Items to be discussed include preparation of substrates prior to coating, plating defects such as pits and nodules and their influence on optics, the influence of stress in coatings, plating details for copper, gold, silver, and electroless nickel, and the importance of additives and their influence on grain size and structure of deposits. Some comments are made on future challenges that could be presented to the plating community to further improve the quality of coatings applied for diamond turning purposes. 60 references, 8 figures, 9 tables.

Dini, J.W.; Waldrop, F.B.; Reno, R.W.

1982-10-06T23:59:59.000Z

355

Reduction of inspection gage wear: an investigation of the value of molybdenum disulphide as a lubricant for inspection gages  

E-Print Network [OSTI]

Collage ef Vewaa im ~1 feifXXI t of tbe esymtremaato foe tba Oegaaa of KSBCTl GF INSPECTS% QgS tlEARi AH HWEBTIGATXN CP %E VAIR GF NCXStNWUN ECSUXRglSl AS A Kl%CCkIT PBL IHSPECTXtN OASES kyye'oeed aa to I pe ed eaaten4 by& hehSMechednSSSSSt Le hceett...Lth ef Na NeehsssLeal lhsNLseessLse: DeyeahaeA Lccss hLs hLsss+ help cas sehalha gLeal ye ehleaa, TARLR QP CORTES;TS I IMTROX' Tl'I& ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 1 II RISTQRY %" PAST R. . SEARC'~ ~ ~ , ~ ~ , ~ ~ . ~ ~ ~ , ~ 6 III &SCRIPTI...

Bragg, Daniel Malcolm

1955-01-01T23:59:59.000Z

356

Summary report for 1990 inservice inspection (ISI) of SRS 100-L reactor tank  

SciTech Connect (OSTI)

The integrity of the SRS reactor tanks is a key factor affecting their suitability for continued service since, unlike the external piping system and components, the tanks are virtually irreplaceable. Cracking in various areas of the process water piping systems has occurred beginning in about 1960 as a result of several degradation mechanisms, chiefly intergranular stress corrosion cracking (IGSCC) and chloride-induced transgranular cracking. The primary objective of this inspection was to determine if the accessible welds and selected portions of base metal in the L Reactor tank wall contain any indications of IGSCC. This inspection included areas in and beyond the weld HAZ, extending out as far as two to three inches from the centerline of the welds, plus selected areas of base metal at the intersection of the main tank vertical and mid-girth welds. No evidence of such degradation was found in any of the areas examined. Further, additional inspections were conducted of areas that had been damaged and repaired during original fabrication, and on a sample of areas containing linear indications observed during the 1986 visual inspection of the tank. No evidence of IGSCC or other service induced degradation was detected in these areas, either. The inspection was initially planned to cover a minimum of 60% of the accessible welds, plus repair areas and a sample of the indications from the 1986 visual inspection. Direction was received from DOE while the inspection was in progress to expand the scope to cover 100% of the accessible weld areas, and the plan was adjusted accordingly. Initial setup of the tank, which prior to inspection contained Mark 60B target assemblies and nearly a full charge of Mark 22 fuel assemblies, began on October 15, 1990. The inspection was completed on April 12, 1991.

Morrison, J.M.; Loibl, M.W.

1991-07-12T23:59:59.000Z

357

Evaluation of flaw characteristics and their influence on inservice inspection reliability. [PWR; BWR  

SciTech Connect (OSTI)

This report describes the results of the first year's effort of a five year program which is being conducted by Battelle, Pacific Northwest Laboratories, on behalf of the US Nuclear Regulatory Commission. This initial effort was directed toward identification and quantification of inspection uncertainties, which are likely to occur during inservice inspection of LWR primary piping systems, and their influence on inspection reliability. These experiments were conducted on 304 stainless steel samples, however, the results are equally applicable to other materials. Later portions of the program will extend these measurements and evaluations to other materials and conditions.

Becker, F.L.

1980-01-01T23:59:59.000Z

358

Energy-efficiency design and inspection guides for affordable housing construction  

SciTech Connect (OSTI)

This paper focuses on the general methods used in guides developed for the energy efficient design and inspection of new and revitalized housing projects for military family housing. The methods and guides can also benefit the wider market of public and other housing. Inspections performed on military and public housing units were used to identify energy deficiencies. The most common problems found were related to disconnected and deteriorated forced air distribution duct work and poor system design resulting in significant air leakage. Design and inspection guides are summarized for new construction and revitalization projects. 7 refs., 7 figs.

Ternes, M.P.; Livengood, S.E.; Wendt, R.L.

1997-12-01T23:59:59.000Z

359

Post-Closure Inspection Letter Report for Corrective Action Units on the Nevada National Security Site  

SciTech Connect (OSTI)

This letter serves as the post-closure inspection letter report for Corrective Action Units (CAUs) on the Nevada National Security Site for calendar year 2013. The inspections identified maintenance and repair is required at the following sites: sign and/or fence repair is necessary at CAUs 113, 137, 139, 140, 143, 262, 370, 371, 372, 374, 476, 478, 529, 542, and 560; animal burrows were identified at CAU 547; and erosion was identified at CAUs 366, 367, 383, 551, and 574. In addition, the following use restrictions were removed during 2013 and will no longer be inspected in 2014: 165, 357, and 528.

Boehleke, R. F.

2014-05-06T23:59:59.000Z

360

Development of a Visual Inspection Checklist for Evaluation of Fielded PV Module Condition (Presentation)  

SciTech Connect (OSTI)

A visual inspection checklist for the evaluation of fielded photovoltaic (PV) modules has been developed to facilitate collection of data describing the field performance of PV modules. The proposed inspection checklist consists of 14 sections, each documenting the appearance or properties of a part of the module. This tool has been evaluated through the inspection of over 60 PV modules produced by more than 20 manufacturers and fielded at two different sites for varying periods of time. Aggregated data from a single data collection tool such as this checklist has the potential to enable longitudinal studies of module condition over time, technology evolution, and field location for the enhancement of module reliability models.

Packard, C. E; Wohlgemuth, J. H.; Kurtz, S. R.

2012-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

REPORT OF ON-SITE INSPECTION WORKSHOP-16  

SciTech Connect (OSTI)

The central issue addressed by this workshop was the task of making the on-site inspection (OSI) part of the Comprehensive Nuclear-Test-Ban Treaty verification system operationally ready at entry into force of the Treaty. It is recognized, and this was emphasized by the 2008 OSI Integrated Field Exercise (IFE), that it is not possible to develop every part of the OSI regime simultaneously. Therefore, it is necessary to prioritize the approach to OSI readiness. The reviews of the IFE have pointed to many elements of OSI readiness that still need development. The objective of this workshop was to provide priorities for the path forward for Working Group B to consider. Several critical areas have been identified that are related to the development of OSI readiness: (1) Technology development: Priorities are radionuclide and noble gas sampling and analysis, visual observation, multispectral/infrared imaging methods, active seismic methods and the recognition of the importance of signatures. (2) Organizational development: Priorities are health and safety, the Operations Support Centre, the Equipment Storage and Maintenance Facility, information technology data flow and communications. (3) Resources: The expertise to develop key parts of the OSI regime is not available within the current OSI Division staff. To develop these aspects of the regime will require more staff or supplements to the staff with cost-free experts or other means. Aspects of the system that could benefit from more staff include radionuclide and noble gas detection methods, data flow and communications, visual observation, multispectral/infrared methods and health and safety. As the path forward, participants of this workshop recognized a need to optimize the development of OSI priorities. The outcome of this workshop is to suggest for consideration an operational approach to OSI readiness that utilizes results of an evaluation of the relative effectiveness of OSI elements versus their relative maturity. By integrating such an assessment with considerations of integrated operational capabilities and the anticipated level of inspection team self-sufficiency and measurable milestone criteria, a set of priorities for OSI development can be developed. Once these priorities have been established, the Policy Making Organs can decide upon the milestones, strategic plan and action plan to serve as guidance for implementation by the Provisional Technical Secretariat. The suggested operational approach is as follows: (1) Assess the relative effectiveness (importance) of OSI elements versus their relative maturity; (2) Determine the anticipated level of self-sufficiency; (3) Define measurable milestone criteria; and (4) Result: Milestones for OSI readiness.

Sweeney, J J

2009-07-07T23:59:59.000Z

362

Inspection Report "Personal Property Management at Lawrence Livermore National Laboratory"  

SciTech Connect (OSTI)

The Department of Energy's (DOE's) Lawrence Livermore National Laboratory (Livermore) is a premier research and development institution for science and technology supporting the core mission of national security. According to Livermore, as of November 2008 the Laboratory managed 64,933 items of Government personal property valued at about $1 billion. At the beginning of Fiscal Year 2008, Livermore reported 249 DOE property items valued at about $1.3 million that were missing, unaccounted for, or stolen during Fiscal Year 2007. Livermore centrally tracks property utilizing the Sunflower Assets system (Sunflower), which reflects the cradle to grave history of each property item. Changes in the custodianship and/or location of a property item must be timely reported by the custodian to the respective property center representative for updating in Sunflower. In Fiscal Year 2008, over 2,000 individuals were terminated as a result of workforce reduction at Livermore, of which about 750 received a final notification of termination on the same day that they were required to depart the facility. All of these terminations potentially necessitated updates to the property database, but the involuntary terminations had the potential to pose particular challenges because of the immediacy of individuals departures. The objective of our inspection was to evaluate the adequacy of Livermore's internal controls over Government property. Based upon the results of our preliminary field work, we particularly focused on personal property assigned to terminated individuals and stolen laptop computers. We concluded that Livermore's internal controls over property could be improved, which could help to reduce the number of missing, unaccounted for, or stolen property items. Specifically, we found that: (1) The location and/or custodian of approximately 18 percent of the property items in our sample, which was drawn from the property assigned to individuals terminated on short notice in 2008, was inaccurately reflected in Sunflower. The data in this system is relied upon for tracking purposes, so inaccurate entries could increase the probability of property not being located during inventories and, thus, being reported as 'lost' or 'missing'. We believe that providing formal training to property custodians, which was not being done at the time of our inspection, could help improve this situation. (2) Some property custodians were not adequately protecting their Government laptop computers when taking them offsite, and they were not held accountable for the subsequent theft of the laptops. We made several recommendations to management intended to improve property controls at Livermore.

None

2009-05-01T23:59:59.000Z

363

Ultrasonic multi-skip tomography for pipe inspection  

SciTech Connect (OSTI)

The inspection of wall loss corrosion is difficult at pipe supports due to limited accessibility. The recently developed ultrasonic Multi-Skip screening technique is suitable for this problem. The method employs ultrasonic transducers in a pitch-catch geometry positioned on opposite sides of the pipe support. Shear waves are transmitted in the axial direction within the pipe wall, reflecting multiple times between the inner and outer surfaces before reaching the receivers. Along this path, the signals accumulate information on the integral wall thickness (e.g., via variations in travel time). The method is very sensitive in detecting the presence of wall loss, but it is difficult to quantify both the extent and depth of the loss. Multi-skip tomography has been developed to reconstruct the wall thickness profile along the axial direction of the pipe. The method uses model-based full wave field inversion; this consists of a forward model for predicting the measured wave field and an iterative process that compares the predicted and measured wave fields and minimizes the differences with respect to the model parameters (i.e., the wall thickness profile). Experimental results are very encouraging. Various defects (slot and flat bottom hole) are reconstructed using the tomographic inversion. The general shape and width are well recovered. The current sizing accuracy is in the order of 1 mm.

Volker, Arno; Zon, Tim van [TNO, Stieltjesweg 1, P.O. Box 155 2600 AD Delft (Netherlands)

2014-02-18T23:59:59.000Z

364

Inspection Date: Inspected By  

E-Print Network [OSTI]

. Corrosive materials are stored low to the ground. Carcinogen storage area(s) is labeled. Chemicals CHECKLIST GENERAL Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA Yes No NA CHEMICAL STORAGE and corrosive storage areas are labeled. Flammables are kept away from sources of heat, ignition, flames, etc

Isaacs, Rufus

365

ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION...  

Broader source: Energy.gov (indexed) [DOE]

5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS Budget and...

366

ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION...  

Broader source: Energy.gov (indexed) [DOE]

5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT Budget and apportionment records...

367

Hanford Double-Shell Tank Inspection Annual Report Calendar Year 2012  

SciTech Connect (OSTI)

The double-shell tanks (DSTs) were constructed between 1968 and 1986. They will have exceeded their design life before the waste can be removed and trasferred to the Waste Treatment and Immobilization Plant for vitrification. The Double-Shell Tank Integrity Project has been established to evaluate tank aging, and ensure that each tank is structurally sound for continued use. This is the first issue of the Double-Shell Tank Inspection Annual Report. The purpose of this issue is to summarize the results of DST inspections conducted from the beginnng of the inspection program through the end of CY2012. Hereafter, the report will be updated annually with summaries of the past year's DST inspection activities.

Petermann, Tasha M.; Boomer, Kayle D.; Washenfelder, D. J.

2013-12-02T23:59:59.000Z

368

Cost of quality tradeoffs in manufacturing process and inspection strategy selection  

E-Print Network [OSTI]

In today's highly competitive markets manufacturers must provide high quality products to survive. Manufacturers can achieve higher levels of quality by changing their manufacturing process and/or by product inspection ...

Zaklouta, Hadi

2011-01-01T23:59:59.000Z

369

Non-Destructive Inspection of Adhesive Bonds in Metal-Metal Joints...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C. lm15moore.pdf More Documents & Publications NonDestructive Inspection of Adhesive Bonds...

370

Ultrasonic inspection of austenitic stainless steel welds with artificially produced stress corrosion cracks  

SciTech Connect (OSTI)

Austenitic stainless steel welds and nickel alloy welds, which are widely used in nuclear power plants, present major challenges for ultrasonic inspection due to the grain structure in the weld. Large grains in combination with the elastic anisotropy of the material lead to increased scattering and affect sound wave propagation in the weld. This results in a reduced signal-to-noise ratio, and complicates the interpretation of signals and the localization of defects. Mechanized ultrasonic inspection was applied to study austenitic stainless steel test blocks with different types of flaws, including inter-granular stress corrosion cracks (IGSCC). The results show that cracks located in the heat affected zone of the weld are easily detected when inspection from both sides of the weld is possible. In cases of limited accessibility, when ultrasonic inspection can be carried out only from one side of a weld, it may be difficult to distinguish between signals from scattering in the weld and signals from cracks.

Dugan, Sandra; Wagner, Sabine [Materials Testing Institute University of Stuttgart (MPA), Pfaffenwaldring 32, 70569 Stuttgart (Germany)

2014-02-18T23:59:59.000Z

371

Fourth optical inspection of integrated circuits using image processing and mathematical morphology: a report  

E-Print Network [OSTI]

test is performed on the microprocessors to insure that they meet the required electrical specifications. Second a visual inspection of the packages is undertaken to reject the parts with surface flows, such as bubbles, blisters, chips...

Chemaly, Ephrem A.

2013-03-13T23:59:59.000Z

372

Get Help -Call a Certified Child Safety Seat Technician For a Free Child Safety Seat Inspection  

E-Print Network [OSTI]

Get Help - Call a Certified Child Safety Seat Technician For a Free Child Safety Seat Inspection Commissioners Courts of Texas Cooperating Get Help - Call a Certified Child Safety Seat Technician For a Free

373

Advanced perception, navigation and planning for autonomous in-water ship hull inspection  

E-Print Network [OSTI]

Inspection of ship hulls and marine structures using autonomous underwater vehicles has emerged as a unique and challenging application of robotics. The problem poses rich questions in physical design and operation, ...

Hover, Franz S.

2013-04-24T23:59:59.000Z

374

Inspection Report: INS-O-13-03 | Department of Energy  

Office of Environmental Management (EM)

Report: INS-O-13-03 March 20, 2013 Inspection Report - Radiological Waste Operations in Area G at Los Alamos National Laboratory Los Alamos National Laboratory (Los Alamos) has a...

375

Inspection of Environment, Safety, and Health Management at the Hanford Site, March 2002  

Broader source: Energy.gov [DOE]

The Secretary of Energys Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) management at the Department of Energy (DOE) Hanford Site in January-February 2002.

376

CASE STUDY 95-04: Operator Certification: A Case Study in Operator Self-Inspection  

E-Print Network [OSTI]

Operator certification is the process where production workers are trained, authorized, and given the necessary resources to inspect their own work. This case study evaluated operator certification systems in the manufacturing ...

Cowap, Stacey

1996-02-22T23:59:59.000Z

377

Process for preparing liquid wastes  

DOE Patents [OSTI]

A process for preparing radioactive and other hazardous liquid wastes for treatment by the method of vitrification or melting is provided for.

Oden, Laurance L. (Albany, OR); Turner, Paul C. (Albany, OR); O'Connor, William K. (Lebanon, OR); Hansen, Jeffrey S. (Corvallis, OR)

1997-01-01T23:59:59.000Z

378

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2012  

SciTech Connect (OSTI)

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2012 and includes inspection and repair activities completed at the following CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR) CAU 407: Roller Coaster RadSafe Area (TTR) CAU 424: Area 3 Landfill Complexes (TTR) CAU 453: Area 9 UXO Landfill (TTR) CAU 487: Thunderwell Site (TTR)

NSTec Environmental Restoration

2013-01-28T23:59:59.000Z

379

Final results of double-shell tank 241-AN-106 ultrasonic inspection  

SciTech Connect (OSTI)

This document presents the results and documentation of the nondestructive ultrasonic examination of tank 241-AN-106. A tank inspection supplier was retained to provide and use an ultrasonic examination system (equipment, procedures, and inspectors) to scan a limited area of double-shell tank 241-AN-106 primary tank wall and welds. The inspection found no reportable indications of thinning, pitting, corrosion, or cracking.

JENSEN, C.E.

1999-08-23T23:59:59.000Z

380

Final results of double-shell tank 241-AZ-101 ultrasonic inspection  

SciTech Connect (OSTI)

This document presents the results and documentation of the nondestructive ultrasonic examination of tank 241-AZ-101. A tank inspection supplier was retained to provide and use an ultrasonic examination system (equipment, procedures, and inspectors) to scan a limited area of double-shell tank 241-AZ-101 primary tank wall and welds. The inspection found one reportable indication of thinning and no reportable pitting, corrosion, or cracking.

JENSEN, C.E.

1999-08-23T23:59:59.000Z

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Final results of double-shell tank 241-AN-105 ultrasonic inspection  

SciTech Connect (OSTI)

This document presents the results and documentation of the nondestructive ultrasonic examination of tank 241-AN-105. A tank inspection supplier was retained to provide and use an ultrasonic examination system (equipment, procedures, and inspectors) to scan a limited area of double-shell tank 241-AN-105 primary tank wall primary knuckle, and secondary tank bottom. The inspection found some indication of general and local wall thinning with no cracks detected.

JENSEN, C.E.

1999-08-23T23:59:59.000Z

382

Final results of double-shell tank 241-AY-102 ultrasonic inspection  

SciTech Connect (OSTI)

This document presents the results and documentation of the nondestructive ultrasonic examination of tank 241-AY-102. A tank inspection supplier was retained to provide and use an ultrasonic examination system (equipment, procedures, and inspectors) to scan a limited area of double-shell tank 241-AY-102 primary tank wall and welds. The inspection found some indication of insignificant general and local wall thinning with no cracks detected.

JENSEN, C.E.

1999-08-23T23:59:59.000Z

383

Eddy current inspection of power plant heat-exchanger tubing in the USA  

SciTech Connect (OSTI)

The latest experience in the eddy current inspection of heat-exchanger tubing by means of ID probes is reported and generalized. The authors demonstrate the feasibility of using modern, general-purpose, digital eddy current flaw detectors equipped with microprocessors, displays, the capability for recording inspection results on paper or magnetic media, sound and visual alarms. The NDE personnel qualification and certification requirements are described.

Fishkin, P.; Nash, J. [MQS Inspection, Inc., Chicago, IL (United States)

1995-02-01T23:59:59.000Z

384

Advanced Ultrasonic Inspection Techniques for General Purpose Heat Source Fueled Clad Closure Welds  

SciTech Connect (OSTI)

A radioisotope thermoelectric generator is used to provide a power source for long-term deep space missions. This General Purpose Heat Source (GPHS) is fabricated using iridium clad vent sets to contain the plutonium oxide fuel pellets. Integrity of the closure weld is essential to ensure containment of the plutonium. The Oak Ridge Y-12 Plant took the lead role in developing the ultrasonic inspection for the closure weld and transferring the inspection to Los Alamos National Laboratory for use in fueled clad inspection for the Cassini mission. Initially only amplitude and time-of-flight data were recorded. However, a number of benign geometric conditions produced signals that were larger than the acceptance threshold. To identify these conditions, a B-scan inspection was developed that acquired full ultrasonic waveforms. Using a test protocol the B-scan inspection was able to identify benign conditions such as weld shield fusion and internal mismatch. Tangential radiography was used to confirm the ultrasonic results. All but two of 29 fueled clads for which ultrasonic B-scan data was evaluated appeared to have signals that could be attributed to benign geometric conditions. This report describes the ultrasonic inspection developed at Y-12 for the Cassini mission.

Moyer, M.W.

2001-01-11T23:59:59.000Z

385

A practical approach to risk-based inservice inspection in U.S. nuclear power plants  

SciTech Connect (OSTI)

To provide guidelines for practical implementation of risk-based ISI, EPRI sponsored work to develop evaluation procedures and criteria for defining risk-based inservice inspection programs for nuclear power plant piping. These procedures and criteria include efficient means to identify risk significant piping segments, inspection locations, and available inspection techniques. These procedures were applied in a pilot study to assess the feasibility of successfully implementing risk-based inservice inspection programs at nuclear plants. The results from the pilot study indicate that implementation of risk-based inservice inspection programs can reduce the cost and radiation exposure associated with inservice inspection, while maintaining a high level of safety. The list of references provides additional details of these procedures and plant-specific applications. Also, an EPRI technical report has been published to document these procedures. Software has been developed to support and fully document this procedure. Additional development is adding an expert system to the present data base system. The approach compares well to approaches used (or being considered) in other industries and can easily be adapted to these other industries and to address economic and personnel safety in addition to public safety measures.

Gosselin, S.R. [Electric Power Research Inst., Charlotte, NC (United States); Gamble, R. [Sartrex Corp., Rockville, MD (United States); Dimitrijevic, V.B.; O`Regan, P.J.; Chapman, J.R. [Yankee Atomic Electric Co., Bolton, MS (United States)

1996-12-01T23:59:59.000Z

386

Qualification Requirements of Guided Ultrasonic Waves for Inspection of Piping in Light Water Reactors  

SciTech Connect (OSTI)

Guided ultrasonic waves (GUW) are being increasingly used for both NDT and monitoring of piping. GUW offers advantages over many conventional NDE technologies due to the ability to inspect large volumes of piping components without significant removal of thermal insulation or protective layers. In addition, regions rendered inaccessible to more conventional NDE technologies may be more accessible using GUW techniques. For these reasons, utilities are increasingly considering the use of GUWs for performing the inspection of piping components in nuclear power plants. GUW is a rapidly evolving technology and its usage for inspection of nuclear power plant components requires refinement and qualification to ensure it is able to achieve consistent and acceptable levels of performance. This paper will discuss potential requirements for qualification of GUW techniques for the inspection of piping components in light water reactors (LWRs). The Nuclear Regulatory Commission has adopted ASME Boiler and Pressure Vessel Code requirements in Sections V, III, and XI for nondestructive examination methods, fabrication inspections, and pre-service and in-service inspections. A Section V working group has been formed to place the methodology of GUW into the ASME Boiler and Pressure Vessel Code but no requirements for technique, equipment, or personnel exist in the Code at this time.

Meyer, Ryan M.; Ramuhalli, Pradeep; Doctor, Steven R.; Bond, Leonard J.

2013-08-01T23:59:59.000Z

387

CIP Preparation Course Summer 2008  

E-Print Network [OSTI]

CIP Preparation Course Summer 2008 Project Lead: Susan Rose, Ph.D. Office for the Protection, and support needed to prepare for and successfully pass the Certified IRB Professional (CIP) examination, State Law (Marlene) Week 9 (8/11/08) *Pre-post practice test, Q&A, CIP Discussion, Test Strategies

Biederman, Irving

388

Advancements of the Hybrid Method UF6 Container Inspection System  

SciTech Connect (OSTI)

Safeguards inspectors currently visit uranium enrichment plants to verify UF6 cylinder enrichment declarations. Measurements are performed with handheld high-resolution detectors on a limited number of cylinders taken to be representative of the plants cylinder inventory. These enrichment assay methods interrogate only a small fraction of the total cylinder volume, and are time-consuming and expensive to execute. Pacific Northwest National Laboratory (PNNL) is developing an automated UF6 cylinder verification station concept based on the combined collection of traditional enrichment-meter data (186 keV photons from 235U) and non-traditional, neutron-induced, high-energy gamma-ray signatures (3-8 MeV) with an array of collimated, medium-resolution scintillators. Previous work at PNNL (2010) demonstrated proof-of-principle that this hybrid method yields accurate, full-volume assay of the cylinder enrichment, reduces systematic errors when compared to several other enrichment assay methods, and provides simplified instrumentation and algorithms suitable for long-term, unattended operations. This system aims to increase the number of inspected cylinders at higher accuracy and with lower cost than when compared to inspectors with hand-held instruments. Several measurement campaigns of 30B cylinder populations and a refined MCNP model will be reported. The MCNP model consists of per-gram basis vectors for the different uranium isotopes and several fill geometries, enabling fast generation of any UF6 enrichment level and multiple configurations. The refined model was used to optimize collimator design and detector configuration for the hybrid method. In addition, a new field prototype based on model results was utilized in a set of field measurements.

Mace, Emily K.; Orton, Christopher R.; Jordan, David V.; McDonald, Benjamin S.; Smith, Leon E.

2011-07-17T23:59:59.000Z

389

Maintain all SAA weekly inspection forms in your laboratory. Forms must be readily available for review. Satellite Accumulation Area -Weekly Inspection Form  

E-Print Network [OSTI]

to the corresponding date of the SAA inspection. A. Good Condition - Containers in good condition, properly labeled containment. No Corrective Action Required. B. Missing Labels - Containers not labeled in compliance with SAA storage requirements. Satellite Accumulation Area ­ Waste Storage Requirements Label Requirements: · Waste

390

Aerial and ground-based inspections of mine sites in the Western U.S.-implications for on-site inspection overflights, under the CTBT  

SciTech Connect (OSTI)

The verification regime of the Comprehensive Test Ban Treaty (CTBT) provides for the possibility of On-Site Inspections (OSI`s) to resolve questions concerning suspicious events which may have been clandestine nuclear tests. Overflights by fixed-wing or rotary-wing aircraft, as part of an OSI, are permitted by the Treaty. These flights are intended to facilitate the narrowing of the inspection area, from an initial permissible 1000 km{sup 2}, and to help select the locations to deploy observers and ground-based sensors (seismic, radionuclides, . . .) Because of the substantial amount of seismicity generated by mining operations worldwide, it is expected that mine sites and mine districts would be prime candidates for OSI`S. To gain experience in this context, a number of aerial and ground-based mine site inspections have been performed in the Western U.S. by Lawrence Livermore National Laboratory since 1994. These inspections are part of a broad range of CTBT mining-related projects conducted by the U.S. Department of Energy and its National Laboratories. The various sites are described next, and inferences are made concerning CTBT OSI`S. All the mines are legitimate operations, with no implication whatsoever of any clandestine tests.

Heuze, F.E.

1997-07-01T23:59:59.000Z

391

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013  

SciTech Connect (OSTI)

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR) CAU 407: Roller Coaster RadSafe Area (TTR) CAU 424: Area 3 Landfill Complexes (TTR) CAU 453: Area 9 UXO Landfill (TTR) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.

Silvas, A. J.

2014-03-03T23:59:59.000Z

392

Development of nondestructive evaluation techniques for DAM inspection. Progress report, January 1995 through August 1997  

SciTech Connect (OSTI)

The Lawrence Livermore National Laboratory has concluded a two and a half year study on the development of an ultrasonic inspection system to inspect post stressed steel tendons on dams and flood gates. The inspection systems were part of a program for the California Department of Water Resources. The effort included the identification of the location and amount of corrosion damage to the tendons, identification of the cause of corrosion, and the technology for inhibiting corrosion. Several NDE methods for inspecting and quantifying damage to steel reinforced concrete water pipes were investigated and presented to the DWR for their consideration. The additional methods included Ground Penetrating RADAR, Electro- Potential Measurements, Infrared Technology, Pipe Inspection Crawlers (designed to travel inside pipelines and simultaneously report on the pipe condition as viewed by ultrasonic methods and video cameras from within the pipeline.) Reference to consultants hired by LLNL for similar on-site corrosion inspections were given to the DWR. The LLNL research into industries that have products to prevent corrosion resulted in the identification of an Innsbruck, Austria, company. This company claims to have products to permanently protect post- or pre-stressed tendons. The caveat is that the tendon protection system must be installed when the tendons are installed because no retrofit is available. Corrosion mitigation on the steel reinforcements surrounding the concrete was addressed through active and passive cathodic protection schemes. The combination of corrosion and erosion were addressed during consideration for the inspection of water-pump impeller-blades that are used in the three stage, million horsepower, pumping stations at Edmunston.

Brown, A. E.; Thomas, G.H.

1997-09-04T23:59:59.000Z

393

,"Total Crude Oil and Petroleum Products Net Receipts by Pipeline, Tanker, Barge and Rail between PAD Districts"  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ <Information Administration (EIA) 103. Relative2. Occupancy ofAviation Gasoline SalesNet Receipts by

394

Licensee contractor and vendor inspection status report: Quarterly report, January--March 1997. Volume 21, Number 1  

SciTech Connect (OSTI)

A fundamental premise of the US Nuclear Regulatory Commission (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The Federal government and nuclear industry have established a system for the inspection of commercial nuclear facilities to provide for multiple levels of inspection and verification. Each licensee, contractor, and vendor participates in a quality verification process in compliance with requirements prescribed by the NRC`s rules and regulations (Title 10 of the Code of Federal Regulations). The NRC does inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of quality verification programs. This periodical covers the results of inspections performed by the NRC`s Special Inspection Branch, Vendor Inspection Section, that have been distributed to the inspected organizations during the period from January 1997 through March 1997.

NONE

1997-07-01T23:59:59.000Z

395

Proceedings of the Inspection and Assessment of Overhead Transmission Line Equipment Workshop: 13-15 May 2003, Monterey, CA  

SciTech Connect (OSTI)

This report contains papers and materials presented at the Inspection and Assessment of Overhead Transmission Line Equipment Workshop held in Monterey, California in May of 2003.

None

2003-10-01T23:59:59.000Z

396

Licensee contractor and vendor inspection status report: Quarterly report, July--September 1997. Volume 21, Number 3  

SciTech Connect (OSTI)

A fundamental premise of the US Nuclear Regulatory Commission (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The Federal government and nuclear industry have established a system for the inspection of commercial nuclear facilities to provide for multiple levels of inspection and verification. Each licensee, contractor, and vendor participates in a quality verification process in compliance with requirements prescribed by the NRC`s rules and regulations (Title 10 of the Code of Federal Regulations). The NRC does inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of quality verification programs. This periodical covers the results if inspections that were performed by the NRC`s Special Inspection Branch, Vendor Inspection Section, and that were distributed to the inspected organizations during the period from July through September 1997.

NONE

1997-11-01T23:59:59.000Z

397

Licensee contractor and vendor inspection status report: Quarterly report, January--March 1996. Volume 20, Number 1  

SciTech Connect (OSTI)

A fundamental premise of the US Nuclear Regulatory Commission (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The Federal government and nuclear industry have established a system for the inspection of commercial nuclear facilities to provide for multiple levels of inspection and verification. Each licensee, contractor, and vendor participates in a quality verification process in compliance with requirements prescribed by the NRC`s rules and regulations (Title 10 of the Code of Federal Regulations). The NRC does inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of quality verification programs. This periodical covers the results of inspections performed by the NRC`s Special Inspection Branch, Vendor Inspection Section, that have been distributed to the inspected organizations during the period from January 1996 through March 1996.

NONE

1996-05-01T23:59:59.000Z

398

Inspection of Nuclear Power Plant Structures - Overview of Methods and Related Applications  

SciTech Connect (OSTI)

The objectives of this limited study were to provide an overview of the methods that are available for inspection of nuclear power plant reinforced concrete and metallic structures, and to provide an assessment of the status of methods that address inspection of thick, heavily-reinforced concrete and inaccessible areas of the containment metallic pressure boundary. In meeting these objectives a general description of nuclear power plant safety-related structures was provided as well as identification of potential degradation factors, testing and inspection requirements, and operating experience; methods for inspection of nuclear power plant reinforced concrete structures and containment metallic pressure boundaries were identified and described; and applications of nondestructive evaluation methods specifically related to inspection of thick-section reinforced concrete structures and inaccessible portions of containment metallic pressure boundaries were summarized. Recommendations are provided on utilization of test article(s) to further advance nondestructive evaluation methods related to thick-section, heavily-reinforced concrete and inaccessible portions of the metallic pressure boundary representative of nuclear power plant containments. Conduct of a workshop to provide an update on applications and needed developments for nondestructive evaluation of nuclear power plant structures would also be of benefit.

Naus, Dan J [ORNL

2009-05-01T23:59:59.000Z

399

Cleareye In-Ground and In-Concrete DIV Inspections: FY11 Final Report  

SciTech Connect (OSTI)

This report summarizes the results of a series of feasibility testing studies for in-ground and in-concrete imaging/detection technologies including radar imaging and acoustic time-of flight method. The objectives of this project are: (1) Design Information Verification (DIV) Tools for In-Concrete Inspections - To determine the feasibility of using holographic radar imaging (HRI), radar imaging, and acoustic time-of-flight (TOF) non-destructive evaluation technologies to detect, locate and identify pipes and voids embedded in standard-density and high-density concrete walls that typify those the IAEA will need to verify during field inspections; (2) DIV Tools for In-Ground Inspections - To determine the feasibility of using HRI and radar imaging non-destructive evaluation technologies to detect, locate, and identify objects buried at various depths made of various materials (metal, plastic, wood, and concrete) and representing geometries that typify those the IAEA will need to verify during field inspections; and (3) Based on the results of the studies, recommend the next steps needed to realize fieldable tools for in-concrete and in-ground inspections (including detection of deeply buried polyvinyl chloride [PVC] pipes) that employ the technologies shown to be feasible.

Braatz, Brett G.; Tedeschi, Jonathan R.; Denslow, Kayte M.; Morra, Marino; Knopik, Clint D.; Severtsen, Ronald H.; Jones, Anthony M.; Lechelt, Wayne M.; McMakin, Douglas L.; Good, Morris S.; Sorensen, Jerry B.; Hall, Thomas E.

2012-01-23T23:59:59.000Z

400

Preparing for Transfer Biological Engineering  

E-Print Network [OSTI]

Environmental Engineering Game Design Industrial Systems & Information Technology Information Science MaterialsPreparing for Transfer Majors: Biological Engineering Chemical Engineering Civil Engineering Computer Science Electrical & Computer Engineering Engineering Physics Environmental Engineering

Walter, M.Todd

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Site-Percolation Threshold of Carbon Nanotube Fibers: Fast Inspection of Percolation with Markov Stochastic Theory  

E-Print Network [OSTI]

We present a site-percolation model based on a modified FCC lattice, as well as an efficient algorithm of inspecting percolation which takes advantage of the Markov stochastic theory, in order to study the percolation threshold of carbon nanotube (CNT) fibers. Our Markov-chain based algorithm carries out the inspection of percolation by performing repeated sparse matrix-vector multiplications, which allows parallelized computation to accelerate the inspection for a given configuration. With this approach, we determine that the site-percolation transition of CNT fibers occurs at p_c =0.1533+-0.0013, and analyze the dependence of the effective percolation threshold (corresponding to 0.5 percolation probability) on the length and the aspect ratio of a CNT fiber on a finite-size-scaling basis. We also discuss the aspect ratio dependence of percolation probability with various values of p (not restricted to p_c).

Xu, Fangbo; Yakobson, Boris I

2014-01-01T23:59:59.000Z

402

Non-destructive inspection protocol for reinforced concrete barriers and bridge railings  

SciTech Connect (OSTI)

Reinforced concrete highway barriers and bridge railings serve to prevent errant vehicles from departing the travel way at grade separations. Despite the important role that they play in maintaining safety and their ubiquitous nature, barrier inspection rarely moves beyond visual inspection. In August 2008, a tractor-trailer fatally departed William Preston Lane, Jr. Memorial Bridge after it dislodged a section of the bridge barrier. Investigations following the accident identified significant corrosion of the anchor bolts attaching the bridge railing to the bridge deck. As a result of the information gathered during its investigation of the accident, the National Transportation Safety Board (NTSB) made recommendations to the Federal Highway Administration concerning Non-Destructive Evaluation (NDE) of concrete bridge railings. The Center for nondestructive evaluation (NDE) at Turner Fairbank Highway Research Center in McLean, VA is currently evaluating feasibility of using four technologies - ground penetrating radar (GPR), ultrasonic pulse-echo, digital radiography and infrared thermal imaging methods to develop bridge inspection methods that augment visual inspections, offer reliable measurement techniques, and are practical, both in terms of time and cost, for field inspection work. Controlled samples containing predefined corrosion levels in reinforcing steel were embedded at barrier connection points for laboratory testing. All four NDE techniques were used in the initial phase I testing. An inspection protocol for detecting and measuring the corrosion of reinforced steel embedded in the anchorage system will be developed as part of phase II research. The identified technologies shall be further developed for field testing utilizing a structure with a barrier in good condition and a structure with a barrier in poor condition.

Chintakunta, Satish R. [Engineering and Software Consultants, Inc., 14123 Robert Paris Ct., Chantilly, VA 20151 (United States); Boone, Shane D. [Federal Highway Administration, Turner Fairbank Highway Research Center, 6300 Georgetown Pike, McLean, VA 22101 (United States)

2014-02-18T23:59:59.000Z

403

Preparation, Characterization, and Catalytic Properties of Tungsten...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Preparation, Characterization, and Catalytic Properties of Tungsten Trioxide Cyclic Trimers on FeO(111)Pt(111). Preparation, Characterization, and Catalytic Properties of Tungsten...

404

Business Owners: Prepare for Utility Disruptions | Department...  

Broader source: Energy.gov (indexed) [DOE]

Utility Disruptions Business Owners: Prepare for Utility Disruptions Business Owners: Prepare for Utility Disruptions Have a plan in place in case a natural disaster or other...

405

Data Polling Routine (PlotHood) to Generate Weekly Inspection Plots for Fort Hood, Texas  

E-Print Network [OSTI]

. For this part of the project, a weather station that includes temperature, humidity and solar sensors was installed at the west substation of Ft. Hood as part of Phase I of this project. Weekly inspection plots of electricity use at the main substation of Ft...-Phase II, p. ii TABLE OF CONTENTS General Abstract i Disclaimer iii Acknowledgments iv Provide Data Polling and Inspection Plots Generation Routine (PlotHood) Executive Summary 2 Existing Monitoring System 3 a- ESL Weather Station at the West Substation. 3...

Saman, N. F.; Reddy, T. A.; Haberl, J. S.; Claridge, D. E.; Turner, W. D.

1996-01-01T23:59:59.000Z

406

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2010  

SciTech Connect (OSTI)

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2010 and includes inspection and repair activities completed at the following seven CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR) CAU 407: Roller Coaster RadSafe Area (TTR) CAU 424: Area 3 Landfill Complexes (TTR) CAU 426: Cactus Spring Waste Trenches (TTR) CAU 453: Area 9 UXO Landfill (TTR) CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) CAU 487: Thunderwell Site (TTR)

NSTec Environmental Restoration

2011-03-30T23:59:59.000Z

407

Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan  

SciTech Connect (OSTI)

This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes.

None

2013-09-01T23:59:59.000Z

408

Y-12 Groundwater Protection Program Monitoring Well Inspection And Maintenance Plan  

SciTech Connect (OSTI)

This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for:  inspecting the physical condition of monitoring wells at Y-12,  determining maintenance needs that extend the life of a well, and  identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment.

none,

2013-09-01T23:59:59.000Z

409

Inspection of Nickel Alloy Welds: Results from Five Year International Program  

SciTech Connect (OSTI)

The U.S. Nuclear Regulatory Commission established and coordinated the international Program for the Inspection of Nickel alloy Components (PINC). The goal of PINC was to evaluate the capabilities of various nondestructive examination (NDE) techniques to detect and characterize primary water stress corrosion cracking (PWSCC) in dissimilar metal welds. Round-robin results showed that a combination of conventional and phased-array ultrasound provide the highest performance for flaw detection and depth sizing in dissimilar metal piping welds. The effective detection of flaws in bottom-mounted instrumentation penetrations by eddy current and ultrasound shows that it may be possible to reliably inspect these components in the field.

Prokofiev, Iouri; Cumblidge, Stephen E.; Doctor, Steven R.

2011-06-23T23:59:59.000Z

410

Inspection Report: INS-L-01-05 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report: IG-071701-05 Inspection

411

Inspection Report: INS-L-12-02 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report: IG-071701-052 Inspection

412

Inspection Report: INS-L-12-05 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report: IG-071701-052 Inspection5

413

Inspection Report: INS-L-13-04 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report: IG-071701-052Inspection

414

Inspection Report: INS-O-01-01 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report: IG-071701-052Inspection1

415

Inspection Report: INS-O-01-03 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report: IG-071701-052Inspection13

416

Inspection Report: INS-O-10-02 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report:0-02 Inspection Report:

417

Inspection Report: INS-O-97-01 | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report:0-02 Inspection

418

Inspection of Lawrence Livermore National Laboratory Protective Force and Special Response Team, IG-0534  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report:0-029IS019 Inspection

419

Inspection of Power Purchase Contracts at the Western Area Power Administration, IG-0372  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 Inspection Report:0-029IS019 InspectionIG-1

420

Path Planning and Control for AERCam, a Free-ying Inspection Robot in Howie Choset David Kortenkamp  

E-Print Network [OSTI]

Path Planning and Control for AERCam, a Free- ying Inspection Robot in Space. Howie Choset David planning and control for space inspection appli- cations. The robot is the rst generation of a free- ying is a testbed for a free- ying space robot. The AERCam IGD consists of several hardware components and is shown

Choset, Howie

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Condition Assessment Survey (CAS) Program. Deficiency standards and inspections methods manual: Volume 7, 0.07 Conveying  

SciTech Connect (OSTI)

System information is given for asset determinant factor/CAS repair codes/CAS cost factors; guide sheet tool & material listing; testing methods; inspection frequency; standard system design life tables; and system work breakdown structure. Deficiency standards and inspection methods are presented for elevators and special conveyors.

Not Available

1993-05-01T23:59:59.000Z

422

Condition Assessment Survey (CAS) Program. Deficiency standards and inspections methods manual: Volume 2, 0.02 Substructure  

SciTech Connect (OSTI)

System information is given for asset determinant factor/CAS repair codes/CAS cost factors; guide sheet tool & material listing; testing methods; inspection frequency; standard system design life tables; system work breakdown structure; and general system/material data. System assembly/component deficiencies and inspection methods are given for slabs-on-grade, columns, and column fireproofing.

Not Available

1993-05-01T23:59:59.000Z

423

COOPERATIVE AND NON-COOPERATIVE DECISION BEHAVIORS IN RESPONSE TO THE INSPECTION AND MAINTENANCE PROGRAM IN THE ATLANTA  

E-Print Network [OSTI]

COOPERATIVE AND NON-COOPERATIVE DECISION BEHAVIORS IN RESPONSE TO THE INSPECTION AND MAINTENANCE BEHAVIORS IN RESPONSE TO THE INSPECTION AND MAINTENANCE PROGRAM IN THE ATLANTA AIRSHED, 1997-2001 Bryan G not have been able to cover the immense research landscape that is presented in this dissertation. Bryan

Vermont, University of

424

A periodic inspection and replacement policy for systems subject to competing failure modes due to degradation and traumatic events  

E-Print Network [OSTI]

A periodic inspection and replacement policy for systems subject to competing failure modes due-making. A condition-based periodic inspection/replacement policy is developed and compared with a benchmark time- based block replacement policy. Numerical results show that it is indeed useful to follow closely

Paris-Sud XI, Université de

425

Room #:________________ Monthly HS+E Lab Inspection Checklist -2004 UBC -Physics+ Astronomy # Item J F M A M J J A S O N D Comments  

E-Print Network [OSTI]

15 Checked by Group Member (initials) 16 Inspected by HS&E Committee Member (initials) Please ensureRoom #:________________ Monthly HS+E Lab Inspection Checklist - 2004 UBC - Physics+ Astronomy

Plotkin, Steven S.

426

Double-Shell Tank Visual Inspection Changes Resulting from the Tank 241-AY-102 Primary Tank Leak  

SciTech Connect (OSTI)

As part of the Double-Shell Tank (DST) Integrity Program, remote visual inspections are utilized to perform qualitative in-service inspections of the DSTs in order to provide a general overview of the condition of the tanks. During routine visual inspections of tank 241-AY-102 (AY-102) in August 2012, anomalies were identified on the annulus floor which resulted in further evaluations. In October 2012, Washington River Protection Solutions, LLC determined that the primary tank of AY-102 was leaking. Following identification of the tank AY-102 probable leak cause, evaluations considered the adequacy of the existing annulus inspection frequency with respect to the circumstances of the tank AY-102 1eak and the advancing age of the DST structures. The evaluations concluded that the interval between annulus inspections should be shortened for all DSTs, and each annulus inspection should cover > 95 percent of annulus floor area, and the portion of the primary tank (i.e., dome, sidewall, lower knuckle, and insulating refractory) that is visible from the annulus inspection risers. In March 2013, enhanced visual inspections were performed for the six oldest tanks: 241-AY-101, 241-AZ-101,241-AZ-102, 241-SY-101, 241-SY-102, and 241-SY-103, and no evidence of leakage from the primary tank were observed. Prior to October 2012, the approach for conducting visual examinations of DSTs was to perform a video examination of each tank's interior and annulus regions approximately every five years (not to exceed seven years between inspections). Also, the annulus inspection only covered about 42 percent of the annulus floor.

Girardot, Crystal L. [Washington River Protection Solutions, Richland, WA (United States); Washenfelder, Dennis J. [Washington River Protection Solutions, Richland, WA (United States); Johnson, Jeremy M. [USDOE Office of River Protection, Richland, WA (United States); Engeman, Jason K. [Washington River Protection Solutions, Richland, WA (United States)

2013-11-14T23:59:59.000Z

427

HSS Finding D3 Corrective Action Plan for LBNL Integrated ES&H Management Inspection  

E-Print Network [OSTI]

LNBL CAP HSS Finding D3 Corrective Action Plan for LBNL Integrated ES&H Management Inspection Owner: Ross Fisher Analyst: Weyland Wong Finding Statement D3: LBNL has not established sufficient processes for Correcting Finding: Richard DeBusk LBNL EH&S Division Laboratory Safety Manager (510) 495-2976 REDe

Knowles, David William

428

Corrective Action Plan-Special DSC Meeting LBNL Integrated ES&H Management Inspection 2009  

E-Print Network [OSTI]

Corrective Action Plan-Special DSC Meeting LBNL Integrated ES&H Management Inspection 2009 Presented April 24, 2009 Finding Statement C-4: LBNL has not established effective processes and rigorous documents that consistently and effectively communicate safety expectations and requirements to LBNL

Knowles, David William

429

Optimizing Inspection Parameters for Long Stand-Off Detection of SNM  

SciTech Connect (OSTI)

Detection of special nuclear material (SNM) at extended ranges (>100 m) through the utilization of high energy (>20 MeV) bremsstrahlung photons requires optimizing the structure and interrelation of irradiation (beam-on) and detection (counting) periods. Conventional inspection schemes at lower energies and smaller distances primarily operate by pulsing an accelerator at frequencies of 0.1-1 kHz while collecting emitted radiation from the target under inspection for the few milliseconds in between pulses. Simulation and experimental results for long stand-off scenarios with source photons >20 MeV, however, indicate that two primary phenomena--(1) induced photoneutrons in proximity to the accelerator and (2) beam induced activation of air and soil--preclude the use of conventional inspection schemes. By considering the time structure and magnitude of the beam-induced photon and neutron backgrounds, signals of interest from the target, and natural backgrounds, inspection schemes have been developed to maximize signal to noise ratios (SNR). Analysis of the data indicates that the highest SNR values are found with short (2-5 s) irradiations followed by a 1-2 s period of collecting emitted neutron and photon signatures.

Johnson, Erik; Blackburn, Brandon; Hynes, Michael [Raytheon Integrated Defense Systems, 50 Apple Hill Drive, Tewksbury, MA 01876 (United States); Hausladen, Paul [Oak Ridge National Laboratory, 1 Bethel Valley Road, Oak Ridge, TN 37831 (United States)

2011-12-13T23:59:59.000Z

430

Safety First Safety Last Safety Always Inspect rigging equipment for material handling before use  

E-Print Network [OSTI]

Safety First Safety Last Safety Always Inspect rigging equipment for material handling before use. Rigging Equipment for Material Handling Safety Tip #19 At your job or at the plate, you can't get home on the reverse side of this safety tip sheet. Please refrain from reading the information verbatim

Minnesota, University of

431

Qualification requirements of guided ultrasonic waves for inspection of piping in light water reactors  

SciTech Connect (OSTI)

It is anticipated that guided ultrasonic wave (GUW) techniques will eventually see widespread application in the nuclear power industry as there are several near-term and future needs that could benefit from the availability of GUW technologies. Already, GUW techniques are receiving consideration for inspecting buried piping at nuclear power plants and future applications may include several Class 1 and 2 components. To accept the results of a nondestructive examination of safety critical components, the U.S. Nuclear Regulatory Commission requires that the examinations be performed using qualified equipment, personnel, and procedures. As the use of GUW techniques becomes more frequent, qualification may be required. Performance demonstration has been the approach to qualifying conventional NDE methods in the nuclear power industry. This paper highlights potential issues and research needs associated with facilitating GUW qualification for the nuclear power industry. Parametric studies of essential inspection parameters are necessary to understand their influence on inspection performance. The large volume sampling capability introduces several challenges for qualifying GUW techniques including the quantification of performance, potential interference caused by the presence of multiple flaws in the inspection region, and the practicality of manufacturing several large qualification specimens. Computer simulation may have a significant role in reducing the experimental burden associated with qualifying GUW techniques for nuclear power plant examinations.

Meyer, R. M.; Ramuhalli, P.; Doctor, S. R. [Applied Physics, Pacific Northwest National Laboratory, Richland, WA 99352 (United States); Bond, L. J. [Center for Nondestructive Evaluation, Iowa State University, Ames, IA 50011 (United States)

2013-01-25T23:59:59.000Z

432

1. INTRODUCTION State of the art pipe inspection devices are generally  

E-Print Network [OSTI]

1. INTRODUCTION State of the art pipe inspection devices are generally four wheeled, camera is trying to upset the stability of the tail of the carriage. These carriages are fed into a pipe on the carriage are a TV camera and lights which illu- minate the inside pipe wall. The signals from the TV camera

Bradbeer, Robin Sarah

433

Wireless Roadside Inspection Phase II Tennessee Commercial Mobile Radio Services Pilot Test Final Report  

SciTech Connect (OSTI)

The Federal Motor Carrier Safety Administration (FMCSA) Wireless Roadside Inspection (WRI) Program is researching the feasibility and value of electronically assessing truck and bus driver and vehicle safety at least 25 times more often than is possible using only roadside physical inspections. The WRI program is evaluating the potential benefits to both the motor carrier industry and to government. These potential benefits include reduction in accidents, fatalities and injuries on our highways and keeping safe and legal drivers and vehicles moving on the highways. WRI Pilot tests were conducted to prototype, test and demonstrate the feasibility and benefits of electronically collecting safety data message sets from in-service commercial vehicles and performing wireless roadside inspections using three different communication methods. This report summarizes the design, conduct and results of the Tennessee CMRS WRI Pilot Test. The purpose of this Pilot test was to demonstrate the implementation of commercial mobile radio services to electronically request and collect safety data message sets from a limited number of commercial vehicles operating in Tennessee. The results of this test have been used in conjunction with the results of the complimentary pilot tests to support an overall assessment of the feasibility and benefits of WRI in enhancing motor carrier safety (reduction in accidents) due to increased compliance (change in motor carrier and driver behavior) caused by conducting frequent safety inspections electronically, at highway speeds, without delay or need to divert into a weigh station

Franzese, Oscar [ORNL; Lascurain, Mary Beth [ORNL; Capps, Gary J [ORNL; Siekmann, Adam [ORNL

2011-05-01T23:59:59.000Z

434

Results of Inspections of Operation of the ORNL Mock Feed/Withdrawal System  

SciTech Connect (OSTI)

Remote monitoring of process activities is one tool under consideration by the International Atomic Energy Agency (IAEA) to handle increasing demands for conducting verification inspections at safeguarded facilities. The ability for the IAEA to continuously monitor feed and withdrawal (F&W) station operations (e.g., load cells and other process attributes) would provide independent verification of normal plant operations, supply data that would make safeguards more effective and efficient, and enable information-driven inspections. Researchers at Oak Ridge National Laboratory (ORNL) have assembled a mock UF6 F&W system using water in lieu of UF6 to test the feasibility of advanced process monitoring systems and concepts (such as remote monitoring) for safeguards. One use of the F&W mockup involves exploring how a safeguards inspector would interact with the data and use it to perform onsite inspections more effectively, so the researchers divided staff into two groups: operators and inspectors. This paper will discuss this process and the promising results of the inspections that have been performed at the mock facility to verify operator declarations and detect material diversion. This paper also will present the intuitive and user-friendly graphic interface researchers used to analyze the information. Although the data gathered previously came from a computer local to the F&W system, future work will include remote transmission and analysis of the data.

White-Horton, Jessica L [ORNL; Laughter, Mark D [ORNL; Krichinsky, Alan M [ORNL

2010-01-01T23:59:59.000Z

435

Gas centrifuge enrichment plants inspection frequency and remote monitoring issues for advanced safeguards implementation  

SciTech Connect (OSTI)

Current safeguards approaches used by the IAEA at gas centrifuge enrichment plants (GCEPs) need enhancement in order to verify declared low enriched uranium (LEU) production, detect undeclared LEU production and detect high enriched uranium (BEU) production with adequate probability using non destructive assay (NDA) techniques. At present inspectors use attended systems, systems needing the presence of an inspector for operation, during inspections to verify the mass and {sup 235}U enrichment of declared cylinders of uranium hexafluoride that are used in the process of enrichment at GCEPs. This paper contains an analysis of how possible improvements in unattended and attended NDA systems including process monitoring and possible on-site destructive analysis (DA) of samples could reduce the uncertainty of the inspector's measurements providing more effective and efficient IAEA GCEPs safeguards. We have also studied a few advanced safeguards systems that could be assembled for unattended operation and the level of performance needed from these systems to provide more effective safeguards. The analysis also considers how short notice random inspections, unannounced inspections (UIs), and the concept of information-driven inspections can affect probability of detection of the diversion of nuclear material when coupled to new GCEPs safeguards regimes augmented with unattended systems. We also explore the effects of system failures and operator tampering on meeting safeguards goals for quantity and timeliness and the measures needed to recover from such failures and anomalies.

Boyer, Brian David [Los Alamos National Laboratory; Erpenbeck, Heather H [Los Alamos National Laboratory; Miller, Karen A [Los Alamos National Laboratory; Ianakiev, Kiril D [Los Alamos National Laboratory; Reimold, Benjamin A [Los Alamos National Laboratory; Ward, Steven L [Los Alamos National Laboratory; Howell, John [GLASGOW UNIV.

2010-09-13T23:59:59.000Z

436

Documentation for fiscal year 1995 annual BUSS cask SARP testing and inspections  

SciTech Connect (OSTI)

The purpose of this report is to compile the data generated during the Fiscal Year (FY) 1995 annual tests and inspections performed on the Beneficial Uses Shipping System (BUSS) cask. The BUSS Cask Model R-1 is a type B shipping container used for shipment of radioactive cesium-137 and strontium-90 capsules to Waste Encapsulation and Storage Facility (WESF). The primary purpose of the BUSS Cask is to provide shielding and confinement as well as impact, puncture, and thermal protection for the capsules under both normal and accident conditions. Section 8.2 ``Maintenance and Periodic Inspection Program`` of the BUSS Cask SARP requires that the following tests and inspections be performed on an annual basis: hydrostatic pressure test; helium leak test; dye penetrant test on the trunnions and life lugs; torque test on all permanent bolts; and impact limiter inspection and weight test. In addition to compiling the generated data, this report will verify that the testing criteria identified in section 8.2 of the BUSS Cask Safety Analysis Report for Packaging (SARP) was met.

Saueressig, P.T.

1994-11-08T23:59:59.000Z

437

Application of SAFER-PC program to determine turbine rotor boresonic inspection intervals  

SciTech Connect (OSTI)

Public Service Company of Colorado (PSCC) used EPRI`s SAFER-PC Program to evaluate their HP/IP, LP, and generator rotors from Cherokee Station Unit 3, to determine appropriate boresonic re-inspection intervals. The program uses fracture mechanics to calculate critical crack sizes, which could lead to catastrophic failure of the rotors. Conservative stress and fracture mechanics analyses showed negligible fatigue crack growth of assumed bore surface cracks would occur over the proposed inspection interval of eighteen years. The evaluation assumed consistent operational start-up procedures for the inspection interval. If the unit experiences more severe operational procedures, the analysis may not be applicable, with smaller critical crack sizes and accelerated crack growth rates expected. The SAFER-PC analysis resulted in an extension of the previously recommended reinspection interval by eight years. By eliminating just this one inspection, PSCC achieved savings in the range of $100,000. Further savings are anticipated by utilizing the SAFER-PC Program to evaluate these and other PSCC rotors in the future.

Sachse, D.G.; Hellner, R.L.; Dupont, E.J. [Public Service Co., Denver, CO (United States)

1996-12-31T23:59:59.000Z

438

Unit 14: Testing and Inspection To introduce software testing and to develop its  

E-Print Network [OSTI]

1 Unit 14: Testing and Inspection Objectives Ð To introduce software testing and to develop its and code as a means of reducing errors in software development. What is Testing? ¥ software testing is the process of seeking errors ¥ this process is active - if we find no errors after performing a test we

Finkelstein, Anthony

439

Binocular Eye Tracking in VR for Visual Inspection Training Andrew T. Duchowski  

E-Print Network [OSTI]

Binocular Eye Tracking in VR for Visual Inspection Training Andrew T. Duchowski Computer Science software techniques for binocular eye tracking within Virtual Reality and discusses their application the environment. Methods are given for (1) integration of the eye tracker into a Vir- tual Reality framework, (2

Duchowski, Andrew T.

440

Review of In-Service Inspection and Repair Technique Developments for French Liquid Metal Fast Reactors  

SciTech Connect (OSTI)

In-service monitoring of nuclear plants is indispensable for both the Operator and the Regulator. The notion of in-service monitoring ranges from the continuous monitoring of the reactor in operation to the thorough in-service reactor inspection during programmed shutdowns. However, the highly specific environment found in French liquid metal fast reactor plants - Phenix and Superphenix - makes monitoring and inspection complicated because of the use of a sodium coolant that is hot, opaque, and difficult to drain.The Commissariat a l'Energie Atomique, in collaboration with its traditional French partners, Electricite de France utilities and FRAMATOME/Novatome Engineering, decided to conduct a 6-yr research and development program (1994-2000) to explore this problem vis-a-vis Superphenix, as well as the possibilities of intervening within the reactor block or on components in a sodium environment. Furthermore, the safety reevaluation of Phenix, conducted between 1994 and 2003, represented an excellent 'test bench' during which the limits of inspection processes - applied to an integrated reactor concept - were surpassed using techniques such as fuel subassembly head scanning, ultrasonic examination of the core support, and visual inspection of the cover-gas plenum following a partial sodium draining. Repair techniques were investigated for cleaning of sodium wet structure surfaces, cutting of damaged parts, and welding in sodium aerosol atmosphere. Both conventional and laser processes were tested.

Baque, F. [Commissariat a l'Energie Atomique Cadarache (France)

2005-04-15T23:59:59.000Z

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

IEEE TRANSACTIONS ON ROBOTICS, VOL. 28, NO. 1, FEBRUARY 2012 223 On Optimizing Autonomous Pipeline Inspection  

E-Print Network [OSTI]

health. As the most economical way to transport gas, oil, bio fuels, water resource, sewer, and so forth. For example, the leak of petroleum pipeline causes ocean pollution and ecocatastrophe. Regular inspections Editor T. Murphey and Editor J.-P. Laumond upon evaluation of the reviewers' comments. This work

Li, Xin "Shane"

442

DEVELOPMENT OF AN ULTRASONIC NDT SYSTEM FOR AUTOMATED IN-SITU INSPECTION OF WIND TURBINE BLADES  

E-Print Network [OSTI]

DEVELOPMENT OF AN ULTRASONIC NDT SYSTEM FOR AUTOMATED IN- SITU INSPECTION OF WIND TURBINE BLADES Abington, Cambridge, CB21 6AL, UK bic@brunel.ac.uk ABSTRACT It is crucial to maintain wind turbine blades. This work investigates using pulse-echo ultrasound to detect internal damages in wind turbine blades without

Boyer, Edmond

443

APPLICATION OF GENETIC ALGORITHMS TO THE MULTI-OBJECTIVE OPTIMIZATION OF THE INSPECTION TIMES OF A  

E-Print Network [OSTI]

APPLICATION OF GENETIC ALGORITHMS TO THE MULTI- OBJECTIVE OPTIMIZATION OF THE INSPECTION TIMES OF A SAFETY SYSTEM OF A PRESSURIZED WATER REACTOR Pietro Giuggioli Busacca, Marzio Marseguerra, Enrico Zio The purpose of this paper is to present an approach to optimization in which every target is considered

Coello, Carlos A. Coello

444

Confidentiality Agreement Relating to In Camera Inspection of Materials Subject to Publication Restrictions  

E-Print Network [OSTI]

, research paper, project or other work that arises out of Restricted Materials, strictly confidentialConfidentiality Agreement Relating to In Camera Inspection of Materials Subject to Publication of materials which are presently subject to publication restrictions outlined in the New Jersey Institute

445

Peltier & Barkan 09-1793 CHARACTERIZING AND INSPECTING FOR PROGRESSIVE EPOXY  

E-Print Network [OSTI]

Peltier & Barkan 09-1793 CHARACTERIZING AND INSPECTING FOR PROGRESSIVE EPOXY DEBONDING IN BONDED INSULATED RAIL JOINTS 09-1793 Daniel C. Peltier* Engineering Management Trainee BNSF Railway 80 44th Ave. NE Minneapolis, MN 55421 Phone: (763) 782-3145 Email: Daniel.Peltier@bnsf.com Christopher P. L. Barkan Associate

Barkan, Christopher P.L.

446

Gas Distribution in Unventilated Indoor Environments Inspected by a Mobile Robot  

E-Print Network [OSTI]

Gas Distribution in Unventilated Indoor Environments Inspected by a Mobile Robot Michael Wandel1@tech.oru.se Abstract Gas source localisation with robots is usually per- formed in environments with a strong in different environments, and the similarities as well as differences in the analyte gas distributions

Zell, Andreas

447

Feasibility of developing risk-based rankings of pressure boundary systems for inservice inspection  

SciTech Connect (OSTI)

The goals of the Evaluation and Improvement of Non-destructive Examination Reliability for the In-service Inspection of Light Water Reactors Program sponsored by the Nuclear Regulatory Commission at Pacific Northwest Laboratory (PNL) are to (1) assess current ISI techniques and requirements for all pressure boundary systems and components, (2) determine if improvements to the requirements are needed, and (3) if necessary, develop recommendations for revising the applicable ASME Codes and regulatory requirements. In evaluating approaches that could be used to provide a technical basis for improved inservice inspection plans, PNL has developed and applied a method that uses results of probabilistic risk assessment (PRA) to establish piping system ISI requirements. In the PNL program, the feasibility of generic ISI requirements is being addressed in two phases. Phase I involves identifying and prioritizing the systems most relevant to plant safety. The results of these evaluations will be later consolidated into requirements for comprehensive inservice inspection of nuclear power plant components that will be developed in Phase II. This report presents Phase I evaluations for eight selected plants and attempts to compare these PRA-based inspection priorities with current ASME Section XI requirements for Class 1, 2 and 3 systems. These results show that there are generic insights that can be extrapolated from the selected plants to specific classes of light water reactors.

Vo, T.V.; Smith, B.W.; Simonen, F.A.; Gore, B.F.

1994-08-01T23:59:59.000Z

448

Advanced Perception, Navigation and Planning for Autonomous In-Water Ship Hull Inspection  

E-Print Network [OSTI]

commercialized at scale. On the other hand, unmanned underwater vehicles have become extraordinarily capable. Leonard Abstract Inspection of ship hulls and marine structures using autonomous underwater vehicles has-capacity com- munications, autonomous underwater vehicles (AUVs) move freely and therefore usually require on

Kaess, Michael

449

A feasibility study of wind turbine blade surface crack detection using an optical inspection method  

E-Print Network [OSTI]

A feasibility study of wind turbine blade surface crack detection using an optical inspection technique was investigated to assess its ability to detect surface flaws on an on-tower wind turbine blade and investors. Rotor blades are one of the largest mechanical components of a wind turbine and cannot

McCalley, James D.

450

Nondestructive examination (NDE) reliability for inservice inspection of light waters reactors  

SciTech Connect (OSTI)

Evaluation and Improvement of NDE Reliability for Inservice Inspection of Light Water Reactors (NDE Reliability) Program at the Pacific Northwest Laboratory was established by the Nuclear Regulatory Commission to determine the reliability of current inservice inspection (ISI) techniques and to develop recommendations that will ensure a suitably high inspection reliability. The objectives of this program include determining the reliability of ISI performed on the primary systems of commercial light-water reactors (LWRs); using probabilistic fracture mechanics analysis to determine the impact of NDE unreliability on system safety; and evaluating reliability improvements that can be achieved with improved and advanced technology. A final objective is to formulate recommended revisions to ASME Code and Regulatory requirements, based on material properties, service conditions, and NDE uncertainties. The program scope is limited to ISI of the primary systems including the piping, vessel, and other inspected components. This is a progress report covering the programmatic work from April 1988 through September 1988. 33 refs., 70 figs., 12 tabs.

Doctor, S.R.; Deffenbaugh, J.D.; Good, M.S.; Green, E.R.; Heasler, P.G.; Simonen, F.A.; Spanner, J.C.; Taylor, T.T. (Pacific Northwest Lab., Richland, WA (USA))

1989-11-01T23:59:59.000Z

451

Engineering task plan for the ultrasonic inspection of hanford double-shell tanks  

SciTech Connect (OSTI)

This document facilitates the ultrasonic examination of Hanford Double-Shell Tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work (SOW) for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptances criteria be discovered.

LYSHER, R.W.

1999-06-23T23:59:59.000Z

452

PREPARED BY: Regional Freight Data  

E-Print Network [OSTI]

.5% Truck, ocean, rail, air Milled grain products and preparations and bakery products 3.3% Truck, rail instruments and apparatus 3.1% Truck, air Printed products 2.9% Truck, rail, air Nonmetallic mineral products for 60% of Oregon jobs · Transportation and logistics account for 20-25% of product cost · Average

Bertini, Robert L.

453

prepared at INRIA Sophia Antipolis  

E-Print Network [OSTI]

PhD THESIS prepared at INRIA Sophia Antipolis and presented at the University of Nice-Sophia Maxime DESCOTEAUX Adviser Rachid Deriche INRIA Sophia Antipolis, France Reviewers Peter Basser NICHD, USA Ayache INRIA Sophia Antipolis, France Habib Benali INSERM / Pitié-Salpêtrière, France Denis Le Bihan

Paris-Sud XI, Université de

454

prepared at INRIA Sophia Antipolis  

E-Print Network [OSTI]

PhD THESIS prepared at INRIA Sophia Antipolis and presented at the University of Nice-Sophia Wassermann Advisor Dr. Rachid Deriche INRIA Sophia-Antipolis, France Reviewers Dr. Cyril Poupon CEA Neuro l' INRIA Sophia Antipolis et present´ee ´a l' Universit´e de Nice-Sophia Antipolis ´Ecole Doctorale

Paris-Sud XI, Université de

455

prepared at INRIA Sophia Antipolis  

E-Print Network [OSTI]

PhD THESIS prepared at INRIA Sophia Antipolis and presented at the University of Nice-Sophia Sophia Antipolis, France Pr. Val´erie Perrier University of Grenoble, France Dr. Fabrice Wallois;UNIVERSIT ´E NICE-SOPHIA ANTIPOLIS - UFR Sciences ´Ecole Doctorale STIC (Sciences et Technologies de l

Paris-Sud XI, Université de

456

prepared at INRIA Sophia Antipolis  

E-Print Network [OSTI]

PhD THESIS prepared at INRIA Sophia Antipolis and presented at the University of Nice-Sophia Voronoi Diagrams and Applications Camille WORMSER Advisors Pr. Jean-Daniel Boissonnat INRIA Sophia Antipolis, France Pr. Mariette Yvinec INRIA Sophia Antipolis, France Reviewers Pr. Aurenhammer Technische

Paris-Sud XI, Université de

457

prepared at INRIA Sophia Antipolis  

E-Print Network [OSTI]

PhD THESIS prepared at INRIA Sophia Antipolis and presented at the University of Nice-Sophia NUNDLOLL Defense date: 30 March 2010. Jury Members Jean Luc GOUZ? INRIA Sophia Antipolis, France Advisor Frédéric GROGNARD INRIA Sophia Antipolis, France Co-advisor Ludovic MAILLERET INRA Sophia Antipolis, France

Paris-Sud XI, Université de

458

prepared at INRIA Sophia Antipolis  

E-Print Network [OSTI]

PhD THESIS prepared at INRIA Sophia Antipolis and presented at the University of Nice-Sophia Pr. Rachid Deriche INRIA Sophia Antipolis, France Pr. Olivier Faugeras INRIA Sophia Antipolis, France-Fredrik Westin Harvard University, USA Examiners Pr. Nicholas Ayache INRIA Sophia Antipolis, France Dr. Maher

Paris-Sud XI, Université de

459

Safety Manual Prepared by the  

E-Print Network [OSTI]

IMS Safety Manual Prepared by the IMS Safety Committee January 1991 (revised 1/2009) Institute 2 Introduction 3 IMS Laboratory Safety Reporting Policy 4 IMS Safety Committee 5 Fire Safety and Emergency Procedures 6 First Aid and Emergency Response 8 General Laboratory Safety 10 Chemical Spills

Alpay, S. Pamir

460

Preparation of gas selective membranes  

DOE Patents [OSTI]

Gas separation membranes which possess improved characteristics as exemplified by selectivity and flux may be prepared by coating a porous organic polymer support with a solution or emulsion of a plasticizer and an organic polymer, said coating being effected at subatmospheric pressures in order to increase the penetration depth of the coating material.

Kulprathipanja, S.; Kulkarni, S.S.; Funk, E.W.

1988-06-14T23:59:59.000Z

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Preparation of gas selective membranes  

DOE Patents [OSTI]

Gas separation membranes which possess improved characteristics as exemplified by selectivity and flux may be prepared by coating a porous organic polymer support with a solution or emulsion of a plasticizer and an organic polymer, said coating being effected at subatmospheric pressures in order to increase the penetration depth of the coating material.

Kulprathipanja, Santi (Hoffman Estates, IL); Kulkarni, Sudhir S. (Hoffman Estates, IL); Funk, Edward W. (Highland Park, IL)

1988-01-01T23:59:59.000Z

462

Arduino Sustainability Project Prepared for  

E-Print Network [OSTI]

Arduino Sustainability Project Prepared for: Dr. Pushkin Kachroo EE 290 UNLV Christian Calvo 2009 by the Arduino microcontroller to satisfy the theme of sustainability. The device I decided to construct is determined by the LDR. The LDR output signal is fed into an analog input of the Arduino. The value is read

Kachroo, Pushkin

463

Preparation of asymmetric porous materials  

DOE Patents [OSTI]

A method for preparing an asymmetric porous material by depositing a porous material film on a flexible substrate, and applying an anisotropic stress to the porous media on the flexible substrate, where the anisotropic stress results from a stress such as an applied mechanical force, a thermal gradient, and an applied voltage, to form an asymmetric porous material.

Coker, Eric N. (Albuquerque, NM)

2012-08-07T23:59:59.000Z

464

RECYCLING RATE STUDY Prepared by  

E-Print Network [OSTI]

NATIONAL RECYCLING RATE STUDY Prepared by: Smith, Bucklin and Associates, Inc. Market Research and Statistics Division Chicago, Illinois July 2003 PRINTED ON RECYCLED PAPER #12;BCI RECYCLING RATE STUDY TABLE ....................................................................................................1 II. METHODOLOGY A. Total Pounds of Lead Recycled from Batteries

Laughlin, Robert B.

465

Pipe inspection using the BTX-II. Innovative technology summary report  

SciTech Connect (OSTI)

The US Department of Energy (DOE) continually seeks safer and more cost-effective remediation technologies for use in the decontamination and decommissioning (D and D) of nuclear facilities. In several of the buildings at the Fernald Site, there is piping that was used to transport process materials. As the demolition of these buildings occur, disposal of this piping has become a costly issue. Currently, all process piping is cut into ten-foot or less sections, the ends of the piping are wrapped and taped to prevent the release of any potential contaminants into the air, and the piping is placed in roll off boxes for eventual repackaging and shipment to the Nevada Test Site (NTS) for disposal. Alternatives that allow for the onsite disposal of process piping are greatly desired due to the potential for dramatic savings in current offsite disposal costs. No means is currently employed to allow for the adequate inspection of the interior of piping, and consequently, process piping has been assumed to be internally contaminated and thus routinely disposed of at NTS. The BTX-II system incorporates a high-resolution micro color camera with lightheads, cabling, a monitor, and a video recorder. The complete probe is capable of inspecting pipes with an internal diameter (ID) as small as 1.4 inches. By using readily interchangeable lightheads, the same system is capable of inspecting piping up to 24 inches in ID. The original development of the BTX system was for inspection of boiler tubes and small diameter pipes for build-up, pitting, and corrosion. However, the system is well suited for inspecting the interior of most types of piping and other small, confined areas. The report describes the technology, its performance, uses, cost, regulatory and policy issues, and lessons learned.

NONE

1999-05-01T23:59:59.000Z

466

preparation  

E-Print Network [OSTI]

Uranium can be removed from groundwater by adding an electron donor to the subsurface that stimulates growth of native bacteria, generating conditions that result in precipitation of uranium. The long-term efficacy of this technology is unproven. Numerical modeling results for uranium bioremediation in a shallow, alluvial aquifer are provided to establish a broad framework for understanding processes associated with bioremediation of uranium and to bound conditions under which bioremediation could succeed in the long-term and conditions under which it is likely to fail. The models are benchmarked against experiments conducted at the Rifle, Colorado site. Sensitivity analysis of model parameters were conducted, examining: alternatives to the acetate electron donor (lactate and ethanol), oxygen and nitrate terminal electron acceptors, multiphase flow, density and gas entrapment processes, and hypothetical flood events. Sensitivity of simulated aqueous U(VI) concentrations to process model parameters suggest that groundwater flow rate, uranium bioreduction rate, and sulfate bioreduction parameters exert the most impact on bioremediation effectiveness. The simulated scenarios are used to assess potential performance issues for site conditions and other bioremediation approaches.

Bioremediation Of Uranium In; Shallow Alluvial Aquifers; Shallow Alluvial Aquifers; S. B. Yabusaki; Y. Fang; S. R. Waichler; P. E. Long

467

Prepared  

E-Print Network [OSTI]

The demand for energy continues to grow in North America. Canada plays a key role in balancing the demand and supply requirements. As the conventional oil reserves are declining in the world, there will be an ever-growing need for exploring the oil resources at remote locations including the vast oil sands deposits in the Athabasca region of northern Alberta and deep water. This paper will present an overview of Canadas conventional oil, oil sands and offshore industry, with primary focus on current production levels, future production forecasts, pipeline issues, and current and potential markets. BUEC 663: NRE Capstone-Group Project

Kaleem Shakir; Mohammed Riaz; Jacob Oommachan

468

Preparation of superconductor precursor powders  

DOE Patents [OSTI]

A process for the preparation of a precursor metallic powder composition for use in the subsequent formation of a superconductor. The process comprises the steps of providing an electrodeposition bath comprising an electrolyte medium and a cathode substrate electrode, and providing to the bath one or more soluble salts of one or more respective metals which are capable of exhibiting superconductor properties upon subsequent appropriate treatment. The bath is continually energized to cause the metallic and/or reduced particles formed at the electrode to drop as a powder from the electrode into the bath, and this powder, which is a precursor powder for superconductor production, is recovered from the bath for subsequent treatment. The process permits direct inclusion of all metals in the preparation of the precursor powder, and yields an amorphous product mixed on an atomic scale to thereby impart inherent high reactivity. Superconductors which can be formed from the precursor powder include pellet and powder-in-tube products.

Bhattacharya, Raghunath (Littleton, CO)

1998-01-01T23:59:59.000Z

469

Method for preparing ceramic composite  

DOE Patents [OSTI]

A process is disclosed for preparing ceramic composite comprising blending TiC particulates, Al{sub 2}O{sub 3} particulates and nickel aluminide and consolidating the mixture at a temperature and pressure sufficient to produce a densified ceramic composite having fracture toughness equal to or greater than 7 MPa m{sup 1/2}, a hardness equal to or greater than 18 GPa. 5 figs.

Alexander, K.B.; Tiegs, T.N.; Becher, P.F.; Waters, S.B.

1996-01-09T23:59:59.000Z

470

Method for preparing ceramic composite  

DOE Patents [OSTI]

A process for preparing ceramic composite comprising blending TiC particulates, Al.sub.2 O.sub.3 particulates and nickle aluminide and consolidating the mixture at a temperature and pressure sufficient to produce a densified ceramic composite having fracture toughness equal to or greater than 7 MPa m.sup.1/2, a hardness equal to or greater than 18 GPa.

Alexander, Kathleen B. (Oak Ridge, TN); Tiegs, Terry N. (Lenoir City, TN); Becher, Paul F. (Oak Ridge, TN); Waters, Shirley B. (Knoxville, TN)

1996-01-01T23:59:59.000Z

471

The preparation of phosphine tellurides  

E-Print Network [OSTI]

THE PREPARATION OF PHOSPHINE TELLURIDES A Thesis Brian Howard Steeves Submitted to the Graduate C o lie ge of the Texas A@M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE January 1965 Major Subject...: Chemistry THE PRKPARATLGN GF PHGSPHINE TELLUREDKS Brian Howard Steeves Approved as to style and content by: (Chairman of Com itte ) (Member) (Head of Dep r nt) (Member (Member) (Mem r) January 1965 ACKNOWLEDGMENT I would like to express my sincere...

Steeves, Brian Howard

2012-06-07T23:59:59.000Z

472

Application of EPRI risk-based inservice inspection procedure to combustion engineering design of nuclear power plant  

SciTech Connect (OSTI)

The EPRI developed risk-based inservice inspection procedure is used to select the elements for inservice inspection on a section of the high pressure safety injection system of the Entergy Operations ANO2 nuclear plant. This plant is the pilot plant in a six utility-eleven plant EPRI tailored collaboration program to apply the general EPRI procedures to Combustion Engineering NSSS designs. The procedure results in a reduction of candidate inspection locations from 14, based on current ASME Section XI rules for B-J welds to 3, based on the risk-based selection criteria.

Lubin, B.T. [ABB Combustion Engineering, Windsor, CT (United States). Nuclear Operations; Fourgerousse, R. [Entergy Operations-ANO2, Russellville, AR (United States)

1996-12-01T23:59:59.000Z

473

Preparation of high purity vanadium  

SciTech Connect (OSTI)

The paper reviews the various reduction and refining methods that have been used to prepare vanadium metal. Earlier work on metallothermic and carbothermic reduction processes is discussed. Recent work on improving the scaling up the aluminothermic reduction process is described in detail. Iron and silicon are first removed from commercial V/sub 2/O/sub 5/ by an ion exchange separation technique and the purified oxide is then exothermically reduced with aluminum metal. The resulting V-Al ingot is heated in a vacuum to 1700/sup 0/C to remove the aluminum and dissolved oxygen, and the sponge is then electron-beam melted to remove residual volatile impurities to yield vanadium metal of 99.98% purity. Precautions taken during each processing stage to minimize carbon, nitrogen and oxygen contamination are described. Metal containing < 50 ppmw each of C, N and O, < 20 ppmw Si, and < 10 ppmw of Fe and Al has been prepared in kilogram quantities by this method. The hardness of the beam melted is 60 to 70 DPH. Experiments designed to scale up the reduction process and to increase the efficiency of the separation and melting steps are described. Various refining techniques that have been applied to the preparation of high purity vanadium are described and comparisons made between the quality of metal obtained by each.

Carlson, O.N.; Burkholder, H.R.; Martsching, G.A.; Schmidt, F.A.

1981-01-01T23:59:59.000Z

474

Erosion/corrosion concerns in feed preparation systems at the Defense Waste Processing Facility  

SciTech Connect (OSTI)

The Savannah River Site (SRS) has been operating a nuclear fuel cycle since the 1950`s to produce nuclear materials in support of the national defense effort. The Department of Energy authorized the construction of the Defense Waste Processing Facility (DWPF) to immobilize the high level radioactive waste resulting from these processes as a durable borosilicate glass. The DWPF, after having undergone extensive testing, has been approved for operations and is currently immobilizing radioactive waste. To ensure reliability of the DWPF remote canyon processing equipment, a materials evaluation program was performed prior to radioactive operations to determine to what extent erosion/corrosion would impact design life of equipment. The program consisted of performing pre-service baseline inspections on critical equipment and follow-up inspections after completion of DWPF cold chemical demonstration runs. Non-destructive examination (NDE) techniques were used to assess erosion/corrosion as well as evaluation of corrosion coupon racks. These results were used to arrive at predicted equipment life for selected feed preparation equipment. It was concluded with the exception of the coil and agitator for the slurry mix evaporator (SME), which are exposed to erosive glass frit particles, all of the equipment should meet its design life.

Gee, J.T.; Chandler, C.T.; Daugherty, W.L.; Imrich, K.J.; Jenkins, C.F.

1997-12-31T23:59:59.000Z

475

Line sensing device for ultrafast laser acoustic inspection using adaptive optics  

DOE Patents [OSTI]

Apparatus and method for inspecting thin film specimens along a line. A laser emits pulses of light that are split into first, second, third and fourth portions. A delay is introduced into the first portion of pulses and the first portion of pulses is directed onto a thin film specimen along a line. The third portion of pulses is directed onto the thin film specimen along the line. A delay is introduced into the fourth portion of pulses and the delayed fourth portion of pulses are directed to a photorefractive crystal. Pulses of light reflected from the thin film specimen are directed to the photorefractive crystal. Light from the photorefractive crystal is collected and transmitted to a linear photodiode array allowing inspection of the thin film specimens along a line.

Hale, Thomas C.; Moore, David S.

2003-11-04T23:59:59.000Z

476

Application of damage mechanism-specific NDE methods in support of risk-informed inspections  

SciTech Connect (OSTI)

Risk-informed inservice inspection (RISI) programs effectively concentrate limited and costly examination resources on systems and locations most relevant to plant safety. The thought process used in the selection of nondestructive evaluation (NDE) methods and procedures in a RISI program is expected to change toward integrating NDE into integrity management, with a concentration on understanding failure mechanisms. Identifying which damage mechanisms may be operative in specific locations and applying appropriate NDE methods to detect the presence of these damage mechanisms is fundamental to effective RISI application. Considerable information is already available on inspection for damage mechanisms such as intergranular stress corrosion cracking (IGSCC), thermal fatigue, and erosion-corrosion. Similar procedures are under development for other damage mechanisms that may occur individually or in combination with other mechanisms. Guidance is provided on application of NDE procedures in an RISI framework to facilitate implementation by utility staff (Gosselin, 1996).

Walker, S.M.; Ammirato, F.V. [EPRI NDE Center, Charlotte, NC (United States)

1996-12-01T23:59:59.000Z

477

Development of electromagnetic acoustic transducer (EMAT) phased arrays for SFR inspection  

SciTech Connect (OSTI)

A long-standing problem for Sodium cooled Fast Reactor (SFR) instrumentation is the development of efficient under-sodium visualization systems adapted to the hot and opaque sodium environment. Electromagnetic Acoustic Transducers (EMAT) are potential candidates for a new generation of Ultrasonic Testing (UT) probes well-suited for SFR inspection that can overcome drawbacks of classical piezoelectric probes in sodium environment. Based on the use of new CIVA simulation tools, we have designed and optimized an advanced EMAT probe for under-sodium visualization. This has led to the development of a fully functional L-wave EMAT sensing system composed of 8 elements and a casing withstanding 200 C sodium inspection. Laboratory experiments demonstrated the probe's ability to sweep an ultrasonic beam to an angle of 15 degrees. Testing in a specialized sodium facility has shown that it was possible to obtain pulse-echo signals from a target under several different angles from a fixed position.

Le Bourdais, Florian; Marchand, Benot [CEA LIST, Centre de Saclay F-91191 Gif-sur-Yvette (France)

2014-02-18T23:59:59.000Z

478

Development of a Visual Inspection Data Collection Tool for Evaluation of Fielded PV Module Condition  

SciTech Connect (OSTI)

A visual inspection data collection tool for the evaluation of fielded photovoltaic (PV) modules has been developed to facilitate describing the condition of PV modules with regard to field performance. The proposed data collection tool consists of 14 sections, each documenting the appearance or properties of a part of the module. This report instructs on how to use the collection tool and defines each attribute to ensure reliable and valid data collection. This tool has been evaluated through the inspection of over 60 PV modules produced by more than 20 manufacturers and fielded at two different sites for varying periods of time. Aggregated data from such a single data collection tool has the potential to enable longitudinal studies of module condition over time, technology evolution, and field location for the enhancement of module reliability models.

Packard, C. E.; Wohlgemuth, J. H.; Kurtz, S. R.

2012-08-01T23:59:59.000Z

479

Integrated Imaging and Vision Techniques for Industrial Inspection: A Special Issue on Machine Vision and Applications  

SciTech Connect (OSTI)

Imaging- and vision-based techniques play an important role in industrial inspection. The sophistication of the techniques assures high- quality performance of the manufacturing process through precise positioning, online monitoring, and real-time classification. Advanced systems incorporating multiple imaging and/or vision modalities provide robust solutions to complex situations and problems in industrial applications. A diverse range of industries, including aerospace, automotive, electronics, pharmaceutical, biomedical, semiconductor, and food/beverage, etc., have benefited from recent advances in multi-modal imaging, data fusion, and computer vision technologies. Many of the open problems in this context are in the general area of image analysis methodologies (preferably in an automated fashion). This editorial article introduces a special issue of this journal highlighting recent advances and demonstrating the successful applications of integrated imaging and vision technologies in industrial inspection.

Liu, Zheng; Ukida, H.; Ramuhalli, Pradeep; Forsyth, D. S.

2010-06-05T23:59:59.000Z

480

Regulators Experiences in Licensing and Inspection of Dry Cask Storage Facilities  

SciTech Connect (OSTI)

The United States Nuclear Regulatory Commission (NRC), through the combination of a rigorous licensing and inspection program, ensures the safety and security of dry cask storage. NRC authorizes the storage of spent fuel at an independent spent fuel storage installation (ISFSI) under two licensing options: site-specific licensing and general licensing. In July 1986, the NRC issued the first site-specific license to the Surry Nuclear Power Plant in Virginia authorizing the interim storage of spent fuel in a dry storage cask configuration. Today, there are over 30 ISFSIs currently licensed by the NRC with over 700 loaded dry casks. Current projections identify over 50 ISFSIs by the year 2010. No releases of spent fuel dry storage cask contents or other significant safety problems from the storage systems in use today have been reported. This paper discusses the NRC licensing and inspection experiences. (authors)

Baggett, S.; Brach, E.W. [Spent Fuel Project Office, U.S. Nuclear Regulatory Commission, Washington, DC 20555 (United States)

2006-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "receipt inspection prepared" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

An overview of the nondestructive inspection techniques for coiled tubing and pipe  

SciTech Connect (OSTI)

Coiled steel tubing and pipe in the diameter range 20--90 mm (0.75--3.5 in.) are replacing conventional oilfield materials for a variety of purposes including workovers, drilling, production tubing, umbilicals, and flowlines. They offer all the advantages of long tubes with no threaded connections. Because coiled tubing is being produced to high quality standards, it is lasting longer than ever before, and the need has arisen for careful nondestructive inspection at frequent intervals to determine accumulated damage to the string and the need for repair. Currently, derating of used coiled tubing using nondestructive testing (NDT) is not performed. While NDT devices for oilfield tubulars have been well documented, little has been written regarding the NDT of coiled tubing. This paper outlines the current NDT methods used during the manufacture of new tubing and the inspection of used coiled tubing.

Stanley, R.K. [Quality Tubing, Inc., Houston, TX (United States)

1996-11-01T23:59:59.000Z

482

Inspection system for a turbine blade region of a turbine engine  

DOE Patents [OSTI]

An inspection system formed at least from a viewing tube for inspecting aspects of a turbine engine during operation of the turbine engine. An outer housing of the viewing tube may be positioned within a turbine engine using at least one bearing configured to fit into an indentation of a support housing to form a ball and socket joint enabling the viewing tube to move during operation as a result of vibrations and other movements. The viewing tube may also include one or more lenses positioned within the viewing tube for viewing the turbine components. The lenses may be kept free of contamination by maintaining a higher pressure in the viewing tube than a pressure outside of the viewing tube and enabling gases to pass through an aperture in a cap at a viewing end of the viewing tube.

Smed, Jan P. (Winter Springs, FL); Lemieux, Dennis H. (Casselberry, FL); Williams, James P. (Orlando, FL)

2007-06-19T23:59:59.000Z

483

Report on inspection of the performance based incentive program at the Richland Operations Office  

SciTech Connect (OSTI)

The Fiscal Year (FY) 1995 Performance Based Incentive (PBI) Program at the Department of Energy`s (DOE) Richland Operations Office (Richland) was initiated by Richland as one part of the broader DOE Contract Reform Initiative being implemented at the Hanford Site in FY 1995. This program was identified as an area of concern by the Office of Inspections as a result of previous inspection work. Specifically, during a limited review of the construction of an Effluent Treatment Facility at the Hanford Site, we were unable to identify any written policies describing PBI program controls or implementation procedures. We were told that Richland Operations Office Program Management personnel were not directly involved in the selection of the Effluent Treatment Facility project for the PBI Program, or in the determination that this particular PBI would be established with a potential fee of $1 million.

NONE

1997-03-10T23:59:59.000Z

484

Stormwater Pollution Prevention Plan Prepared by  

E-Print Network [OSTI]

Stormwater Pollution Prevention Plan Prepared by: Environment, Health, Safety, and Security .....................................................16 3.0 Potential Sources of Pollution

Eisen, Michael

485

Experimental flight test vibration measurements and nondestructive inspection on a USCG HC-130H aircraft  

SciTech Connect (OSTI)

This paper presents results of experimental flight test vibration measurements and structural inspections performed by the Federal Aviation Administration`s Airworthiness Assurance NDI Validation Center (AANC) at Sandia National Laboratories and the US Coast Guard Aircraft Repair and Supply Center (ARSC). Structural and aerodynamic changes induced by mounting a Forward Looking Infrared (FLIR) system on a USCG HC-130H aircraft are described. The FLIR adversely affected the air flow characteristics and structural vibration on the external skin of the aircraft`s right main wheel well fairing. Upon initial discovery of skin cracking and visual observation of skin vibration in flight by the FLIR, a baseline flight without the FLIR was conducted and compared to other measurements with the FLIR installed. Nondestructive inspection procedures were developed to detect cracks in the skin and supporting structural elements and document the initial structural condition of the aircraft. Inspection results and flight test vibration data revealed that the FLIR created higher than expected flight loading and was the possible source of the skin cracking. The Coast Guard performed significant structural repair and enhancement on this aircraft, and additional in-flight vibration measurements were collected on the strengthened area both with and without the FLIR installed. After three months of further operational FLIR usage, the new aircraft skin with the enhanced structural modification was reinspected and found to be free of flaws. Additional US Coast Guard HC-130H aircraft are now being similarly modified to accommodate this FLIR system. Measurements of in-flight vibration levels with and without the FLIR installed, and both before and after the structural enhancement and repair were conducted on the skin and supporting structure in the aircraft`s right main wheel fairing. Inspection results and techniques developed to verify the aircraft`s structural integrity are discussed.

Moore, D.G.; Jones, C.R. [Sandia National Labs., Albuquerque, NM (United States). FAA Airworthiness Assurance NDI Validation Center; Mihelic, J.E.; Barnes, J.D. [Coast Guard Aircraft Repair and Supply Center, Elizabeth City, NC (United States)

1998-08-01T23:59:59.000Z

486

On-site Inspection Agency (OSIA) FY 1998-2003 program objective memorandum (POM)  

SciTech Connect (OSTI)

Arms control is an integral part of our country`s national security strategy. Arms control ensures confidence in compliance through effective inspection, monitoring, and verification; and, ultimately, contributes to a more stable and calculable balance of power. The full and faithful implementation of existing arms control agreements, followed by ratification of the Strategic Arms Reduction Treaty (START II) and Chemical Weapons (CW) Agreements remains an important element of the Administration`s national security policy. With the entry into force (ElF) of the Strategic Arms Reduction Treaty (START) in the first quarter 1w 1995, ElF of START II planned for late 1w 1996, ElF of the Open Skies (OS) Treaty and the Chemical Weapons Convention (CWC) planned for 1w 1997, and ElF of the Chemical Weapons Bilateral Destruction Agreement (CW BDA) now planned for 1w 1998, OSIA POM resources have been adjusted to support the significantly expanded missions associated with these Treaties in the outyears. The OSIA continues its efforts to carry out the inspection, escort, and monitoring provisions of the Intermediate-Range Nuclear Forces (INF) and Conventional Armed Forces in Europe (CFE) Treaties, as well as to maintain a standby status for the Nuclear Test Ban Treaties (NTBT). With the advent of new missions, OSIA is playing an expanding role in providing support to the Cooperative Threat Reduction (CTR) Program and Safeguards, Transparency, and Irreversibility (STI) Agreements. Other missions include support for the Biological Weapons (BW) Program and the Technical Equipment Inspections (TEl) Program, Executive Agent for the Defense Treaty Inspection Readiness Program (DTIRP), and the United Nations Special Commission (UNSCOM) on fraq. Our latest mission involves providing support for the Bosnia Peace Plan initiative.

NONE

1996-05-01T23:59:59.000Z

487

The Potential for Energy Retrofits within the City of Sacramento's Rental Housing Inspection Program  

SciTech Connect (OSTI)

This report presents the results of an analysis performed by Pacific Northwest National Laboratory for the City of Sacramento--under the U.S. Department of Energys Energy Efficiency and Renewable Energy Office of Weatherization and Intergovernmental Projects Technical Assistance Program--to help determine the potential for incorporating energy efficiency standards into the Citys existing Rental Housing Inspection Program as part of Sacramentos efforts to create a Climate Action Plan.

Iverson, Megan M.; Sande, Susan; Britt, Michelle L.

2011-04-15T23:59:59.000Z

488

Ultrasonic Inspection Results of Double Shell Tank (DST) 241-AP-108 [SEC 1 and 2  

SciTech Connect (OSTI)

This document presents the results and documentation of the non-destructive ultrasonic examination (NDE) of tank 241-AP-107. An NDE contractor was retained to provide and use an ultrasonic inspection system (equipment, procedures, and inspectors) to scan a limited area of the primary tank wall, welds, and lower knuckle of double-shell tank 241-AP-107. The exam found no reportable indications of wall thinning, pits, or crack in excess of the acceptance criteria.

JENSEN, C.E.

2000-09-11T23:59:59.000Z

489

DEVELOPMENT OF AN INSPECTION PLATFORM AND A SUITE OF SENSORS FOR ASSESSING CORROSION AND MECHANICAL DAMAGE ON UNPIGGABLE TRANSMISSION MAINS  

SciTech Connect (OSTI)

The National Energy Technology Laboratory of the US Department of Energy (under Award DE-FC26-02NT41645) and the NYSEARCH Committee of the Northeast Gas Association (previous the New York Gas Group), have sponsored research to develop a robotic pipeline inspection system capable of navigation through the typical physical and operational obstacles that make transmission and distribution pipelines unpiggable. The research contractors, Foster-Miller and GE Oil & Gas (PII North America) have performed an engineering study and developed a conceptual design that meets all the requirements for navigating and inspecting unpiggable transmission pipelines. Based on Foster-Miller's previous efforts developing the Pipe Mouse robot, the RoboScan inspection robot (Figure ES-1) meets the navigational and physical challenges of unpiggable pipelines through an innovative modular platform design, segmented MFL inspection modules and improvements to the inter-module coupling design.

George C. Vradis; William Leary

2004-03-01T23:59:59.000Z

490

PREPARED FOR: The National Renewable Energy Laboratory  

E-Print Network [OSTI]

Wind and solar integration study May 2010 Prepared for NREL by GE Energy 1 River Road Schenectady, New York 12345PREPARED FOR: The National Renewable Energy Laboratory A national laboratory of the U.S. Department of Energy PREPARED BY: GE Energy MAY 2010 WESTERNWIND AND SOLAR INTEGRATION STUDY #12;#12;Western

491

Managing aging in nuclear power plants: Insights from NRC maintenance team inspection reports  

SciTech Connect (OSTI)

A plant`s maintenance program is the principal vehicle through which age-related degradation is managed. From 1988 to 1991, the NRC evaluated the maintenance program of every nuclear power plant in the United States. Forty-four out of a total of 67 of the reports issued on these in-depth team inspections were reviewed for insights into the strengths and weaknesses of the programs as related to the need to understand and manage the effects of aging on nuclear plant systems, structures, and components. Relevant information was extracted from these inspection reports and sorted into several categories, including Specific Aging Insights, Preventive Maintenance, Predictive Maintenance and Condition Monitoring, Post Maintenance Testing, Failure Trending, Root Cause Analysis and Usage of Probabilistic Risk Assessment in the Maintenance Process. Specific examples of inspection and monitoring techniques successfully used by utilities to detect degradation due to aging have been identified. The information also was sorted according to systems and components, including: Auxiliary Feedwater, Main Feedwater, High Pressure Injection for both BWRs and PWRs, Service Water, Instrument Air, and Emergency Diesel Generator Air Start Systems, and Emergency Diesel Generators Air Start Systems, emergency diesel generators, electrical components such as switchgear, breakers, relays, and motor control centers, motor operated valves and check valves. This information was compared to insights gained from the Nuclear Plant Aging Research (NPAR) Program. Attributes of plant maintenance programs where the NRC inspectors felt that improvement was needed to properly address the aging issue also are discussed.

Fresco, A.; Subudhi, M.; Gunther, W.; Grove, E.; Taylor, J. [Brookhaven National Lab., Upton, NY (United States)

1993-12-01T23:59:59.000Z

492

Isis: An expert system for risk-based inservice inspection assessment  

SciTech Connect (OSTI)

The ASME Section XI Working Group on Implementation of Risk-Based (RB) Examination produced a code case to define risk-based selection rules that could be used for In-Service Inspection (ISI) of Class 1, 2 and 3 piping. To provide guidelines for practical implementation of the code case, EPRI sponsored work to develop evaluation procedures and criteria. The approach focuses inspections on locations which are selected based upon an explicit consideration of experienced degradation mechanisms and potential consequences. Software has been developed to execute and document this approach. Data and expert system modules address system operating characteristics, design attributes, the potential for damage mechanisms and the impact of component failures (i.e., loss of pressure boundary integrity). These modules are integrated in a stand alone software package. In addition, because the system is microcomputer based, the software is not cumbersome or costly to deploy. The goal of this effort was to develop a tool that will accomplish two tasks. That is, (1) Reduce the cost of the Risk Based Inservice Inspection (RBISI) evaluation effort by increasing the productivity of the BISI analyst, and (2) Provide a structured analytical and documentation package that lends itself to increases in consistency within an individual plant application, as well as across the industry.

Barbetta, N.L.; Dimitrijevic, V.B.; Eivers, G.D.; O`Regan, P.J. [Yankee Nuclear Services Division, Bolton, MA (United States)

1996-12-01T23:59:59.000Z

493

The inspection of a radiologically contaminated pipeline using a teleoperated pipe crawler  

SciTech Connect (OSTI)

In the 1950s, the Savannah River Site built an open, unlined retention basin to temporarily store potentially radionuclide contaminated cooling water from a chemical separations process and storm water drainage from a nearby waste management facility that stored large quantities of nuclear fission byproducts in carbon steel tanks. The retention basin was retired from service in 1972 when a new, lined basin was completed. In 1978, the old retention basin was excavated, backfilled with uncontaminated dirt, and covered with grass. At the same time, much of the underground process pipeline leading to the basin was abandoned. Since the closure of the retention basin, new environmental regulations require that the basin undergo further assessment to determine whether additional remediation is required. A visual and radiological inspection of the pipeline was necessary to aid in the remediation decision making process for the retention basin system. A teleoperated pipe crawler inspection system was developed to survey the abandoned sections of underground pipelines leading to the retired retention basin. This paper will describe the background to this project, the scope of the investigation, the equipment requirements, and the results of the pipeline inspection.

Fogle, R.F.; Kuelske, K.; Kellner, R.A.

1995-08-01T23:59:59.000Z

494

Documentation for initial testing and inspections of Beneficial Uses Shipping System (BUSS) Cask  

SciTech Connect (OSTI)

The purpose of this report is to compile data generated during the initial tests and inspections of the Beneficial Uses Shipping System (BUSS) Cask. In addition, this report will verify that the testing criteria identified in section 8.1 of the BUSS Cask Safety Analysis Report for Packaging (SARP) was met. The BUSS Cask Model R-1 is a type B shipping container used for shipment of radioactive cesium-137 and strontium-90 capsules to Waste Encapsulation and Storage Facility (WESF). The BUSS Cask body and lid are each one-piece forgings fabricated from ASTM A473, Type 304 stainless steel. The primary purpose of the BUSS Cask is to provide shielding and confinement as well as impact, puncture, and thermal protection for the capsules under both normal and accident conditions. Chapter 8 of the BUSS Cask SARP requires several acceptance tests and inspections, each intended to evaluate the performance of different components of the BUSS Cask system, to be performed before its first use. The results of the tests and inspections required are included in this document.

Lundeen, J.E.

1994-08-25T23:59:59.000Z

495

Inspection of surveillance equipment and activities at DOE Field Office, Richland  

SciTech Connect (OSTI)

The purpose of this inspection was to review surveillance activities by the Department of Energy's (DOE) Field Office, Richland (RL) and contractor employees at the RL Hanford site for efficiency and economy and compliance with laws and regulations. The scope included surveillance activities, procedures, training, types of surveillance equipment, and management controls over the equipment and activities. We also looked at Departmental policies and procedures regarding the equipment and activities. Allegations of illegal surveillance that came to our attention during the course of this inspection were referred to the Department of Justice. As part of our review, inspectors were on-site at RL from February 11, 1991, through March 1, 1991. Follow-up trips to RL were also made in April, May, and June 1991. We also conducted interviews at Albuquerque, Savannah River, and Germantown of former RL employees and RL contractors who were on travel. Officials from DOE's Office of General Counsel (OGC), Office of Security Affairs, and Office of Safeguards and Security (S S) were also interviewed regarding the Department's purchase and possession of wiretapping and eavesdropping devices. We obtained 75 signed sworn statements from 55 individuals during the course of the inspection. 1 fig., 1 tab.

Not Available

1991-09-30T23:59:59.000Z

496

Inspection of the objects on the sea floor by using 14 MeV tagged neutrons  

SciTech Connect (OSTI)

Variety of objects found on the sea floor needs to be inspected for the presence of materials which represent the threat to the environment and to the safety of humans. We have demonstrated that the sealed tube 14 MeV neutron generator with the detection of associated alpha particles can be used underwater when mounted inside ROV equipped with the hydraulic legs and variety of sensors for the inspection of such objects for the presence of threat materials. Such a system is performing the measurement by using the NaI gamma detector and an API-120 neutron generator which could be rotated in order to maximize the inspected target volume. The neutron beam intensity during the 10-30 min. measurements is usually 1 x 10{sup 7} n/s in 4{pi}. In this report the experimental results for some of commonly found objects containing TNT explosive or its simulant are presented. The measured gamma spectra are dominant by C, O and Fe peaks enabling the determination of the presence of explosives inside the ammunition shell. Parameters influencing the C/O ratio are discussed in some details. (authors)

Valkovic, V. [A.C.T.d.o.o., Prilesje 4, Zagreb (Croatia); Sudac, D.; Obhodas, J. [Dept. of Experimental Physics, Inst. Ruder Boskovic, Zagreb (Croatia); Matika, D. [Inst. for Researches and Development of Defense Systems, Zagreb (Croatia); Kollar, R. [A.C.T.d.o.o., Prilesje 4, Zagreb (Croatia); Nad, K.; Orlic, Z. [Dept. of Experimental Physics, Inst. Ruder Boskovic, Zagreb (Croatia)

2011-07-01T23:59:59.000Z

497

Chapter 6 List of Preparers  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate Earth Day with SecretaryDerivedof&6. LIST OF PREPARERS

498

Design and analysis of a laser oriented, automatic dimensional inspection system for high-speed process control  

E-Print Network [OSTI]

Filter. Photodetector . Electronic Subsystem ~ Signal Generation Signal Amplii'ication. 10 15 16 19 19 22 22 25 25 viii Cl~~er IV. Signal Comparison . ~ Reference Voltage Control Logical Generation of Ejection Pulse, . ~ EXPERIMENTAL... Repeatability. . ~ 66 LIST OF FIGURES 2, 1 3 ~ 3 3. 4 ~Pe Automatic Process Control System . . 6 General Design of Outer Dimension Inspection System, Analog Inspection Signal and Reference Voltages . . ~. . . ~ ~ . 14. Simulated, High-Speed Production...

Ward, Steven Morris

1972-01-01T23:59:59.000Z

499

Condition Assessment Survey (CAS) Program. Deficiency standards and inspections methods manual: Volume 12, 0.12 Sitework  

SciTech Connect (OSTI)

General information is presented for asset determinant factor/CAS repair codes/CAS cost factors; guide sheet tool & material listing; testing methods; inspection frequency; standard system design life tables; system work breakdown structure; and general system/material data. Deficiency standards and inspection methods are given for utility distribution systems, central heating, central cooling, electrical, utility support structures, paving roadways/walkways, and tunnels.

Not Available

1993-05-01T23:59:59.000Z

500

Condition Assessment Survey (CAS) Program. Deficiency standards and inspections methods manual: Volume 6, 0.06 Interior construction  

SciTech Connect (OSTI)

General information is presented for asset determinant factor/CAS repair codes/CAS cost factors; guide sheet tool & material listing; testing methods; inspection frequency; standard system design life tables; system work breakdown structure; and general system/material data. Deficiency standards and inspection methods are presented for conventional and specialty partitions, toilet partitions & accessories, interior doors, paint finishes/coatings/ wall covering systems; floor finishing systems; and ceiling systems.

Not Available

1993-05-01T23:59:59.000Z