1

EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO  

Broader source: Energy.gov [DOE]

Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69 kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing the EA. Further information about the project is available on the project website.

2

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington  

Broader source: Energy.gov [DOE]

Bonneville Power Administration prepared this EA to evaluate potential environmental impacts of rebuilding approximately 28 miles of the Grand Coulee-Creston No. 1 115-kilovolt (kV) transmission line between Coulee Dam in Grant County and Creston in Lincoln County, Washington.

3

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

4

Rio Grande project partnerships  

E-Print Network [OSTI]

for supporting hydrologic analysis and modeling. The information will help develop bi-national cooperation between Mexico and the United States concerning water in the Rio Grande Basin. It will also provide accurate and reli- able data necessary for analysis... municipal demands. With the population expected to double in the next 50 years, the urban water demands will increase proportionately. Story by Danielle Supercinski At the Cameron County Irrigation District No. 2 in San Benito, sluice gates inside...

Supercinski, Danielle

2008-01-01T23:59:59.000Z

5

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

6

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) – with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency – is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado. Additional information is available on Western’s project website.

7

Monticello Unit 3 recovery project: The rebuild of a first generation wet flue gas desulfurization system  

SciTech Connect (OSTI)

Since November 1993, TU Electric and Sargent & Lundy have been engaged in the repair or replacement of equipment that was damaged by the collapse of the Monticello Unit 3 chimney. In addition to the replacement of the chimney, electrostatic precipitator, and various balance-of-plant systems, the scope of the project includes the demolition, engineering and design, procurement, and construction activities to rebuild major equipment within the wet limestone flue gas desulfurization (FGD) system. This paper reviews and discusses various aspects of the design, procurement and schedule associated with the rebuild of the FGD system. The paper reviews the design selections in the areas of process technology, the absorber island, and technical enhancements to improve the operability of this 1970s-vintage system. Finally, the challenges and solutions in implementing a 17-month schedule for the design, construction, and startup of an FGD system will be discussed.

Guletsky, P.W.; Katzberger, S.M. [Sargent & Lundy, Chicago, IL (United States); Jeanes, R.L. [TU Electric, Dallas, TX (United States)

1995-06-01T23:59:59.000Z

8

Switchyards Rebuild and Upgrade Project in Mohave County, Arizona  

Broader source: Energy.gov (indexed) [DOE]

on April 1 ,2011 and complete it by December 31,2011. The attached map shows the project area location. Aerial photographs show that much of this area is developed. Western owns...

9

Snake River Sockeye Salmon Sawtooth Valley Project Conservation and Rebuilding Program : Supplemental Fnal Environmental Assessment.  

SciTech Connect (OSTI)

This document announces Bonneville Power Administration`s (BPA) proposal to fund three separate but interrelated actions which are integral components of the overall Sawtooth Valley Project to conserve and rebuild the Snake River Sockeye salmon run in the Sawtooth Valley of south-central Idaho. The three actions are as follows: (1) removing a rough fish barrier dam on Pettit Lake Creek and constructing a weir and trapping facilities to monitor future sockeye salmon adult and smolt migration into and out of Pettit Lake; (2) artificially fertilizing Readfish Lake to enhance the food supply for Snake River sockeye salmon juveniles released into the lake; and (3) trapping kokanee fry and adults to monitor the fry population and to reduce the population of kokanee in Redfish Lake. BPA has prepared a supplemental EA (included) which builds on an EA compled in 1994 on the Sawtooth Valley Project. Based on the analysis in this Supplemental EA, BPA has determined that the proposed actions are not major Federal actions significantly affecting the quality of the human environment. Therefore an Environmental Impact Statement is not required.

United States. Bonneville Power Administration.

1995-03-01T23:59:59.000Z

10

Winning the Future: Grand Ronde Solar Projects Reduce Pollution...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Winning the Future: Grand Ronde Solar Projects Reduce Pollution, Cut Costs Winning the Future: Grand Ronde Solar Projects Reduce Pollution, Cut Costs October 20, 2014 - 5:00pm...

11

EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR  

Broader source: Energy.gov [DOE]

This EIS evaluates the environmental impacts of a proposal by BPA to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line in Lane and Linn Counties, OR.

12

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon.

13

Grande  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

breaks ground on key sediment control project November 5, 2009 Structures will limit flow of sediments toward Rio Grande Los Alamos, New Mexico, November 5, 2009- Crews broke...

14

EA-1931: Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration prepared this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available.

15

Rio Grande Project Power Sales Rate History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared0 Resource Program September DepartmentRio Grande Project Power

16

EA-1987: Parker-Headgate Rock and Parker-Bouse Rebuild Project, Arizona and California  

Broader source: Energy.gov [DOE]

DOE’s Western Area Power Administration is preparing an EA that will assess the potential environmental impacts of a proposal to rebuild the existing Parker Dam-Headgate Rock and Parker Dam-Bouse 161-kilovolt transmission lines along the Colorado River in western Arizona and eastern California.

17

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

18

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana  

Broader source: Energy.gov [DOE]

DOE’s Bonneville Power Administration (BPA) is preparing an EIS that will analyze the potential environmental impacts of a proposal to rebuild approximately 120 miles of existing transmission line in Sanders, Lake, Missoula, Granite, Powell, and Deer Lodge Counties in Montana. Additional information is available at http://efw.bpa.gov/environmental_services/Document_Library/HotSpringsAna....

19

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona  

Broader source: Energy.gov [DOE]

Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis–Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service.

20

EA-1855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA  

Broader source: Energy.gov [DOE]

Draft Environmental Assessment DOE will prepare an EA to evaluate the potential environmental impacts from rebuilding the Creston-Bell No. 1 115-kV transmission line, including the replacement of wood poles and associated structural components and conductor and access road improvements. The 54-mile long, wood pole line extends from the Bonneville Power Administration (BPA) Creston substation to the BPA Bell substation near Spokane in Lincoln and Spokane Counties, Washington.

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EA-1948: Gila-North Gila Transmission Line Rebuild and Upgrade Project, Yuma County, Arizona  

Broader source: Energy.gov [DOE]

DOE’s Western Area Power Administration (Western) prepared this EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service’s construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies.

22

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

by the Bureau of Reclamation to design and construct six new 500-kV overhead transmission lines at Grand Coulee Dam. BPA will replace the existing underground transmission...

23

EA-0930: Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of the proposal to expand and upgrade the U.S. Department of Energy's Grand Junction Projects Office facilities and operations in Grand Junction, Colorado.

24

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...  

Broader source: Energy.gov (indexed) [DOE]

Florence, Oregon. Additional information is available at the project website: http:efw.bpa.govenvironmentalservicesDocumentLibraryLane-Wendson. PUBLIC COMMENT OPPORTUNITIES...

25

Environmental Audit of the Grand Junction Projects Office  

SciTech Connect (OSTI)

The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs.

Not Available

1991-08-01T23:59:59.000Z

26

From Tragedy to Triumph - Rebuilding with Renewable Energy after...  

Energy Savers [EERE]

Fact sheet offering practical information about rebuilding using wind, geothermal, and biomass. Includes a list of resources. Highlights successful projects in Greensburg, Kansas....

27

Charging Up For Formula Sun Grand Prix By Jonathan Nutzmann, Project Manager  

E-Print Network [OSTI]

Charging Up For Formula Sun Grand Prix By Jonathan Nutzmann, Project Manager The team is currently busy with training for our next race, Formula Sun Grand Prix, which is com- ing up May 2nd-7th

Janssen, Michel

28

The 'Grand Paris' Project: Tools and Challenges | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen,Ltd Jump Jump to:Information 'Grand Paris' Project: Tools and

29

Grand Ronde Basin Fish Habitat Enhancement Project, 2008 Annual Report.  

SciTech Connect (OSTI)

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing the opportunities for natural fish production within the basin. This project originally provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented under revisions of the Fish and Wild Program as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires considerable time be spent developing rapport with landowners to gain acceptance, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources, is the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by the Grande Ronde Model Watershed Program (Project. No. 199202601). Work undertaken during 2008 included: (1) completing 1 new fencing project in the North Fork John Day subbasin that protects 1.82 miles of stream and 216.2 acres of habitat, and 1 fencing project in the Wallowa subbasin that protects an additional 0.59 miles of stream and 42.5 acres of habitat; (2) constructing 0.47 miles of new channel on the Wallowa river to enhance habitat, restore natural channel dimensions, pattern and profile and reconnect approximately 18 acres of floodplain and wetland habitat; (3) planting 10,084 plants along 0.5 miles of the Wallowa Riverproject; (4) establishing 34 new photopoints on 5 projects and retaking 295 existing photopoint pictures; (5) monitoring stream temperatures at 10 locations on 5 streams and conducting other monitoring activities; (6) completing riparian fence, water gap and other maintenance on 116.8 miles of project fences; and (7) completed a comprehensive project summary report to the Independent Scientific Review panel (ISRP) that provided our conclusions regarding benefits to focal species, along with management recommendations for the future. Since initiation of this program 57 individual projects have been implemented, monitoring and maintained along 84.9 miles of anadromous fish bearing streams, that protect and enhance 3,564 acres of riparian and instream habitat.

McGowan, Vance R.; Morton, Winston H. [Oregon Department of Fish and Wildlife] [Oregon Department of Fish and Wildlife

2009-07-01T23:59:59.000Z

30

Grande Ronde Endemic Spring Chinook Project - ODFW, 2008 Annual Report.  

SciTech Connect (OSTI)

Core activities of the Grande Ronde Endemic Spring Chinook Supplementation Program (GRESCSP) are funded through the authority of the Lower Snake River Fish and Wildlife Compensation Plan (LSRCP). The LSRCP program was approved by the Water Resources Development Act of 1976, PL 94-587, Section 102, 94th Congress substantially in accordance with the Special Report, LSRCP, June 1975 on file with the Chief of Engineers. The LSRCP was prepared and submitted in compliance with the Fish and Wildlife Coordination Act of 1958, PL 85-624, 85th Congress, August 12, 1958 to mitigate for the losses of fish and wildlife caused by the construction of dams on lower Snake River. The GRESCSP is an artificial propagation program that was initiated by Bonneville Power Administrations Fish and Wildlife program in the mid 1990's. The intent of this program was to change the mitigation aspect of the LSRCP program (harvest mitigation) to an integrated supplementation program; inasmuch as, hatchery produced fish could be experimentally used as a recovery tool and fish surplus to mitigation would be available for in-place and in-kind harvest. Fish production is still authorized by the LSRCP with the original mitigation return goal of 5,860 adult spring Chinook to the project area. The GRESCSP was developed with two primary components: (1) conventional broodstock (projects 199800702; 199800703; 199800704) and (2) captive brood (projects 199801001; 199801006). The GRESCSP relies on cooperative M&E efforts from the LSRCP including setting aside the Wenaha and Minam tributaries as natural production reserves components used for reference streams. The GRESCSP, coordinated with federal and tribal partners, identifies production levels for both propagation components and weir management strategies for each of the three supplemented tributary areas within the Grande Ronde Sub-basin. The three supplemented areas are Catherine Creek, Lostine River, and upper Grande Ronde River. Lookingglass Creek, an extirpated area, will be stocked (smolts and adults) with Catherine Creek origin salmon to initiate natural production in unseeded habitat, and to initiate future harvest opportunities. The current production levels have been incorporated into the U.S. v. Oregon Interim Management Agreement. The purpose of this contract is to integrate Bonneville Power Administration (BPA) efforts with the Lower Snake River Compensation Plan (LSRCP) program utilizing Lookingglass Hatchery as the primary rearing facility. BPA constructed an adult holding and spawning structure on the hatchery grounds; however, maintenance of this infrastructure was discontinued due to funding limitation and transferred to the LSRCP program in 2007. These integrated efforts focus on holding and spawning adults, rearing juveniles, fish health, and monitoring natural production (Redd counts) for Catherine Creek, Lostine River, and Upper Grande Ronde stocks.

Patterson, Scott

2009-04-10T23:59:59.000Z

31

Microsoft Word - CX-Colville-Republic_Rebuild_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

Eric Orth Project Manager - TEP-TPP-3 Proposed Action: Colville-Republic No. 1 115-kV rebuild project Budget Information: Work Order 00270698 PP&A Project No.: PP&A 1786...

32

From Tragedy to Triumph - Rebuilding with Renewable Energy after Disaster, EERE (Fact Sheet)  

SciTech Connect (OSTI)

Fact sheet offering practical information about rebuilding using wind, geothermal, and biomass. Includes a list of resources. Highlights successful projects in Greensburg, Kansas.

Not Available

2009-10-01T23:59:59.000Z

33

Grand challenge problems in environmental modeling and remediation: Groundwater contaminant transport. Final project report 1998  

SciTech Connect (OSTI)

The over-reaching goal of the Groundwater Grand Challenge component of the Partnership in Computational Science (PICS) was to develop and establish the massively parallel approach for the description of groundwater flow and transport and to address the problem of uncertainties in the data and its interpretation. This necessitated the development of innovative algorithms and the implementation of massively parallel computational tools to provide a suite of simulators for groundwater flow and transport in heterogeneous media. This report summarizes the activities and deliverables of the Groundwater Grand Challenge project funded through the High Performance Computing grand challenge program of the Department of Energy from 1995 through 1997.

NONE

1998-04-01T23:59:59.000Z

34

Grand Opening for Project LIBERTY: Nation's First Plant to Use...  

Office of Environmental Management (EM)

uses biochemical conversion technologies (yeast and enzymes) to convert cellulosic biomass into transportation fuels. The U.S. Department of Energy (DOE) has supported Project...

35

EA-1617: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana  

Broader source: Energy.gov [DOE]

DOE’s Western Area Power Administration prepared this EA and a finding of no significant impact for a proposal to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kV transmission lines, located in Big Horn County, Wyoming, and Big Horn and Carbon Counties in Montana, and the Basin-Lovell 115-kV transmission line in Big Horn County, Wyoming.

36

Creston-Bell Rebuild Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases on &gamma;-Al2O3.Winter (Part 2) |IO COECreating

37

Albany-Eugene Rebuild Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAbout theOFFICE OF RESEARCH ANDCONTACTS George

38

Estimated Benefits of IBWC Rio Grande Flood-Control Projects in the United States  

E-Print Network [OSTI]

TR- 275 2004 Estimated Benefits of IBWC Rio Grande Flood-Control Projects in the United States Allen W. Sturdivant Ronald D. Lacewell Ari M. Michelsen M. Edward Rister Naomi Assadian Marian Eriksson Roger Freeman Jennifer H... Flood-Control Projects in the United States Prepared for: INTERNATIONAL BOUNDARY AND WATER COMMISSION, UNITED STATES SECTION EL PASO, TEXAS SEPTEMBER 2004 Prepared by: Texas Agriculture Experiment Station, and Texas Water Resources Institute of the Texas...

Sturdivant, Allen W.; Lacewell, Ronald D.; Michelsen, Ari M.; Rister, M. Edward; Assadian, Naomi; Eriksson, Marian; Freeman, Roger; Jacobs, Jennifer H.; Madison, W. Tom; McGuckin, James T.; Morrison, Wendy; Robinson, John R.C.; Staats, Chris; Sheng, Zhuping; Srinivasan, R.; Villalobos, Joshua I.

39

Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report  

SciTech Connect (OSTI)

Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2.

Morris, R.

1996-05-01T23:59:59.000Z

40

Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards.

NONE

1996-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

REBUILD AMERICA PROGRAM SCOPE OF WORK  

SciTech Connect (OSTI)

This report summarizes the activities carried out by Aspen Systems Corporation in support of the Department of Energy's Rebuild America program during the period from October 9, 1999 to October 31, 2004. These activities were in accordance with the Scope of Work contained in a GSA MOBIS schedule task order issued by the National Energy Technology Laboratory. This report includes descriptions of activities and results in the following areas: deployment/delivery model; program and project results; program representative support activities; technical assistance; web site development and operation; business/strategic partners; and training/workshop activities. The report includes conclusions and recommendations. Five source documents are also provided as appendices.

Jeffrey Brown; Bruce Exstrum

2004-12-01T23:59:59.000Z

42

Site observational work plan for the UMTRA project site at Grand Junction, Colorado  

SciTech Connect (OSTI)

This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer.

NONE

1996-01-01T23:59:59.000Z

43

Microsoft Word - CX-Chehalis-Raymond_rebuild_2010_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

9, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Eric Orth Project Manager - TEP-TPP-3 Proposed Action: Rebuild a 19 mile section of the Chehalis-Raymond...

44

Grand Junction Projects Office site environmental report for calendar year 1992  

SciTech Connect (OSTI)

This report presents information pertaining to environmental activities conducted during calendar year 1992 at the US Department of Energy Grand Junction Projects Office (DOE-GJPO) facility in Colorado. Environmental activities conducted at the GJPO facility during 1992 included those associated with environmental compliance, site remediation, off-site dose modeling, and radiological and nonradiological monitoring. Four phases of the on-site Grand Junction Projects Office Remedial Action Project were completed in 1992. Remediation activities, which included the removal of 161,589 tons of uranium-mill-tailings-contaminated material from the facility, were conducted in compliance with all applicable permits. Off-site dose modeling for the GJPO was conducted to determine compliance with current National Emission Standards for Hazardous Air Pollutants, Subpart H, and applicable DOE Orders (5400.1 and 5400.5). The total off-site EDE to the public from all sources of radiation emanating from the facility (radon, air particulates, gamma) was calculated as 9 mrem/yr, which is well below the DOE dose limit of 100 mrem/yr above background. The radiological and nonradiological monitoring program at the GJPO facility included monitoring of activities that generate potentially hazardous or toxic wastes and monitoring of ambient air, surface water, and ground water.

Not Available

1993-05-01T23:59:59.000Z

45

Grande Ronde Basin Fish Habitat Enhancement Project, Annual Report 2002-2003.  

SciTech Connect (OSTI)

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an agreement to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In July of 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the intergovernmental contract, and on March 1, 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. This project calls for passive regeneration of habitat, using riparian exclosure fencing as the primary method to restore degraded streams to a normative condition. Active remediation techniques using plantings, off-site water developments, site-specific instream structures, or whole channel alterations are also utilized where applicable. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and local watershed councils. Work undertaken during 2002 included: (1) Implementing 1 new fencing project in the Wallowa subbasin that will protect an additional 0.95 miles of stream and 22.9 acres of habitat; (2) Conducting instream work activities in 3 streams to enhance habitat and/or restore natural channel dimensions, patterns or profiles; (3) Planting 31,733 plants along 3.7 stream miles, (4) Establishing 71 new photopoints and retaking 254 existing photopoint pictures; (5) Monitoring stream temperatures at 12 locations on 6 streams; (6) Completing riparian fence, water gap and other maintenance on 100.5 miles of project fences. Since initiation of the project in 1984 over 68.7 miles of anadromous fish bearing streams and 1,933 acres of habitat have been protected, enhanced and maintained.

McGowan, Vance

2003-08-01T23:59:59.000Z

46

Overview of the Rebuild America Program in Texas  

E-Print Network [OSTI]

Company, the utility. PG&E Energy Services is not regulated by the California Public Utilities Commission; and you do not have to buy PG&E Energy Services' products in order to continue to receive quality regulated services from Pacific Gas and Electric... in construction costs. Energy and IAQ monitoring and savings calculations have been performed at two of the three Rebuild America projects. The type of energy retrofit projects range from lighting retrofits to implementing EMCs. RESULTS Case Study: Bryan ISD...

Saman, N.; Haberl, J. S.; Turner, W. D.

1998-01-01T23:59:59.000Z

47

Rebuilding of Rautaruukki blast furnaces  

SciTech Connect (OSTI)

Rautaruukki Oy Raahe Steel rebuilt its blast furnaces in 1995 (BF1) and 1996 (BF2) after 10 year campaigns and production of 9,747 THM/m{sup 3} (303 NTHM/ft{sup 3}) and 9,535 THM/m{sup 3} (297 NTHM/ft{sup 3}), respectively. At the end of the campaigns, damaged cooling system and shell cracks were increasingly disturbing the availability of furnaces. The goal for rebuilding was to improve the cooling systems and refractory quality in order to attain a 15 year campaign. The furnaces were slightly enlarged to meet the future production demand. The blast furnace control rooms and operations were centralized and the automation and instrumentation level was considerably improved in order to improve the operation efficiency and to reduce manpower requirements. Investments in direct slag granulation and improved casthouse dedusting improved environmental protection. The paper describes the rebuilding.

Kallo, S.; Pisilae, E.; Ojala, K. [Rautaruukki Oy Raahe Steel (Finland)

1997-12-31T23:59:59.000Z

48

Preliminary Analysis of Grande Ronde Basalt Formation Flow Top Transmissivity as it Relates to Assessment and Site Selection Applications for Fluid/Energy Storage and Sequestration Projects  

SciTech Connect (OSTI)

Preliminary Analysis of Grande Ronde Basalt Formation Flow Top Transmissivity as it Relates to Assessment and Site Selection Applications for Fluid/Energy Storage and Sequestration Projects

Spane, Frank A.

2013-04-29T23:59:59.000Z

49

From Tragedy to Triumph: Rebuilding Greensburg, Kansas To Be...  

Office of Environmental Management (EM)

Rebuilds as a National Model for Green Communities (Fact Sheet) Greensburg, Kansas: Building a Model Green Community, How Would You Rebuild a Town - Green? April 2009...

50

From Tragedy to Triumph - Rebuilding Green Buildings after Disaster...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Rebuilding Green Buildings after Disaster, EERE (Fact Sheet) From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE (Fact Sheet) Fact sheet offering practical...

51

Impacts of the Cerro Grande fire on Homestead era and Manhattan Project properties at Los Alamos National Laboratory.  

SciTech Connect (OSTI)

In May of 2000, the Cerro Grande Fire burned approximately 8,000 acres of Department of Energy (DOE) managed land at the Los Alamos National Laboratory (LANL). Although the fire was generally of low intensity, it impacted a significant number of LANL's cultural resources. Historic wooden properties were affected more heavily than prehistoric archaeological sites. This paper will provide an overview of the Homestead and Manhattan Project Periods at LANL and will discuss the effects of the Cerro Grande Fire on historic wooden properties. Post-fire cultural resource management issues will also be discussed.

McGehee, E. D. (Ellen D.); Isaacson, J. (John)

2001-01-01T23:59:59.000Z

52

Confirmatory radiological survey of the Grand Junction Projects Office Remedial Action Project exterior portions, 1989-1995  

SciTech Connect (OSTI)

The purpose of this independent assessment was to provide the U.S. Department of Energy (DOE) with an independent verification (IV) that the soil at the Grand Junction Projects Office (GJPO) complies with applicable DOE guidelines. Oak Ridge National Laboratory/ Environmental Technology Section (ORNL/ETS) which is also located at the GJPO, was assigned by DOE as the Independent Verification Contractor (IVC). The assessment included reviews of the decontamination and decommissioning plan, annual environmental monitoring reports, data in the pre- and post-remedial action reports, reassessment reports and IV surveys. Procedures and field methods used during the remediation were reviewed, commented on, and amended as needed. The IV surveys included beta-gamma and gamma radiation scans, soil sampling and analyses. Based on the data presented in the post-remedial action report and the results of the IV surveys, the remediation of the outdoor portions of the GJPO has achieved the objectives. Residual deposits of uranium contamination may exist under asphalt because the original characterization was not designed to identify uranium and subsequent investigations were limited. The IVC recommends that this be addressed with the additional remediation. The IVC is working with the remedial action contractor (RAC) to assure that final documentation WM be sufficient for certification. The IVC will address additional remediation of buildings, associated utilities, and groundwater in separate reports. Therefore, this is considered a partial verification.

Forbes, G.H.; Egidi, P.V.

1997-04-01T23:59:59.000Z

53

EA-1972: Electric District 2 to Saguaro No. 2 Transmission Line Rebuild, Pinal County, Arizona  

Broader source: Energy.gov [DOE]

Western Area Power Administration issued a Draft EA that assesses the potential environmental impacts of the proposed rebuild of a 35.6-mile transmission line that Western operates and maintains under an agreement with the Central Arizona Project. Additional information is available on the project website, http://www.wapa.gov/dsw/environment/ED2DOEEA1972.htm.

54

Final report of the decontamination and decommissioning of the exterior land areas at the Grand Junction Projects Office facility  

SciTech Connect (OSTI)

The US Department of Energy (DOE) Grand Junction Projects Office (GJPO) facility occupies approximately 56.4 acres (22.8 hectares) along the Gunnison River near Grand Junction, Colorado. The site was contaminated with uranium ore and mill tailings during uranium-refining activities conducted by the Manhattan Engineer District and during pilot-milling experiments conducted for the US Atomic Energy Commission`s (AEC`s) domestic uranium procurement program. The GJPO facility was the collection and assay point for AEC uranium and vanadium oxide purchases until the early 1970s. The DOE Decontamination and Decommissioning Program sponsored the Grand Junction Projects Office Remedial Action Project (GJPORAP) to remediate the facility lands, site improvements, and the underlying aquifer. The site contractor, Rust Geotech, was the Remedial Action Contractor for GJPORAP. The exterior land areas of the facility assessed as contaminated have been remediated in accordance with identified standards and can be released for unrestricted use. Restoration of the aquifer will be accomplished through the natural flushing action of the aquifer during the next 50 to 80 years. The remediation of the DOE-GJPO facility buildings is ongoing and will be described in a separate report.

Widdop, M.R.

1995-09-01T23:59:59.000Z

55

U.S. Department of Energy Grand Junction Projects Office site environmental report for calendar year 1995  

SciTech Connect (OSTI)

This report presents information pertaining to environmental activities conducted during calendar year 1995 at the US Department of Energy (DOE) Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Environmental activities conducted at the GJPO facility during 1995 were associated with mixed-waste treatment, site remediation, off-site dose modeling, and radiological and nonradiological monitoring. As part of the GJPO Mixed-Waste Treatment Program, on-site treatability studies were conducted in 1995 that made use of pilot-scale evaporative-oxidation and thermal-desorption units and bench-scale stabilization. DOE-GJPO used some of its own mixed-waste as well as samples received from other DOE sites for these treatability studies. These studies are expected to conclude in 1996. Removal of radiologically contaminated materials from GJPO facility buildings was conducted under the provisions of the Grand Junction Projects Office Remedial Action Project. Remediation activities included the removal of 394 metric tons of contaminated material from Buildings 18 and 28 and revegetation activities on the GJPO site; remediation was conducted in compliance with applicable permits.

NONE

1996-05-01T23:59:59.000Z

56

Midway-Benton No. 1 Rebuild Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment SurfacesResource Program PreliminaryA3, 1999of Science

57

Line Rebuild, Relocation and Substation Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickrinformationPostdocsCenterCenter (LMI-EFRC) -PrinciplesLeeLindadefault

58

PTI TECHNICAL ASSISTANCE TO REBUILD AMERICA  

SciTech Connect (OSTI)

Public Technology Inc. (PTI) engaged in a cooperative agreement, DE-FC26-01NT41107, with the US Department of Energy's (DOE) Rebuild America Program to provide energy efficiency and energy conservation technical assistance to local governments across the United States. The first year of the cooperative agreement dated from April 2, 2001 to April 1, 2002, at a funding level of $375,000. This technical report covers the period of October 2001--March 2002. PTI appreciates the support that it has received from Rebuild America and plans to continue, with DOE and Rebuild America support, to serve in a strategic capacity, lending the technical experience of its staff and that of the Energy Task Force on approaches to increasing program efficiencies, furthering program development, and coordinating information sharing to help ensure that energy programs are responsive to the needs of local governments.

Unknown

2002-04-01T23:59:59.000Z

59

Grand Junction Projects Office Remedial Action Project: Feasibility test of real-time radiation monitoring during removal of surface contamination from concrete floors  

SciTech Connect (OSTI)

This feasibility test was conducted to determine if real-time radiation-monitoring instruments could be mounted on decontamination machines during remediation activities to provide useful and immediate feedback to equipment operators. The U.S. Department of Energy (DOE) sponsored this field test under the Grand Junction Projects Office Remedial Action Project (GJPORAP) to identify a more efficient method to remove radiological contamination from concrete floor surfaces. This test demonstrated that project durations and costs may be reduced by combining radiation-monitoring equipment with decontamination machines. The test also demonstrated that a microprocessor-based instrument such as a radiation monitor can withstand the type of vibration that is characteristic of floor scabblers with no apparent damage. Combining radiation-monitoring equipment with a decontamination machine reduces the time and costs required to decontaminate concrete surfaces. These time and cost savings result from the reduction in the number of interim radiological surveys that must be conducted to complete remediation. Real-time radiation monitoring allows equipment operators to accurately monitor contamination during the decontamination process without support from radiological technicians, which also reduces the project duration and costs. The DOE Grand Junction Projects Office recommends more extensive and rigorous testing of this real-time radiation monitoring to include a variety of surfaces and decontamination machines. As opportunities arise, additional testing will be conducted under GJPORAP.

Leino, R.; Corle, S.

1995-10-01T23:59:59.000Z

60

Iran rebuilding petroleum industry, output capacity  

SciTech Connect (OSTI)

This paper reports on Iran which has turned away from stern isolationism this year in order to rebuild a war-ravaged petroleum industry and stimulate its economy. The reconstruction effort includes participation, under terms still not well defined, by non-Iranian companies in upstream oil and gas operations.

Tippee, B.

1991-12-02T23:59:59.000Z

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

PTI TECHNICAL ASSISTANCE TO REBUILD AMERICA  

SciTech Connect (OSTI)

Public Technology Inc. (PTI) engaged in a cooperative agreement, DE-FC26-01NT41107, with the US Department of Energy's (DOE) Rebuild America Program to provide energy efficiency and energy conservation technical assistance to local governments across the United States. The first year of the cooperative agreement dated from April 2, 2001 to April 1, 2002, at a funding level of $375,000. The new contractual period (with a no-cost extension) extended from April 2, 2002 until September 30, 2002. This final technical progress report covers the April--September contract period and reports on activities performed, by PTI, during that period. PTI appreciates the support that it has received from Rebuild America and plans to continue, with DOE and Rebuild America support, to serve in a strategic capacity, lending the technical experience of its staff and that of the Energy Task Force on approaches to increasing program efficiencies, furthering program development, and coordinating information sharing to help ensure that energy programs are responsive to the needs of local governments.

Unknown

2002-10-01T23:59:59.000Z

62

Rebuilding It Better; BTI-Greensburg, John Deere Dealership ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

to save close to 50% in annual energy cost. 45491.pdf More Documents & Publications Building Green in Greensburg: BTI Greensburg John Deere Rebuilding It Better: Greensburg,...

63

Rebuilding It Better: Greensburg, Kansas, High Performance Buildings...  

Broader source: Energy.gov (indexed) [DOE]

2007-May 2009 From Tragedy to Triumph: Rebuilding Greensburg, Kansas To Be a 100% Renewable Energy City: Preprint Data Preparation Process for the Buildings Performance Database...

64

Rebuilding It Better: Greensburg, Kansas. USD 422 Greensburg...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Greensburg, Kansas. USD 422 Greensburg K-12 School (Revised) (Brochure), Energy Efficiency & Renewable Energy (EERE) Rebuilding It Better: Greensburg, Kansas. USD 422 Greensburg...

65

From Tragedy to Triumph - Resources for Rebuilding Green after...  

Office of Environmental Management (EM)

after Disaster, EERE (Fact Sheet) From Tragedy to Triumph - Resources for Rebuilding Green after Disaster, EERE (Fact Sheet) Fact sheet offering resources for builders and...

66

EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild its 24-mile long, 115 kilovolt Bonneville-Hood River transmission line. The existing line runs between the Bonneville Powerhouse at Bonneville Dam in Multnomah County, Oregon, and BPA's existing Hood River Substation in Hood River County, Oregon. The project would include replacing structures and conductor wires, improving access roads, and constructing new access roads or trails where needed.

67

Evaluation of Canal Lining Projects in the Lower Rio Grande Valley  

E-Print Network [OSTI]

?unintentional?vandalism,?and?normal?irrigation?district?operational?and?maintenance? activities.??Each?project?was?evaluated?using?a?visual?inspection?process?during?which? performance/condition?ratings?were?assigned.? ? Without?question,?the?best?lining?system?is?a?synthetic?liner?with?a?protective?barrier?of? shotcrete.??The?synthetic?liner?significantly?reduces?seepage,?while?the?shotcrete?protects...?it? from?damage.??This?lining?system?needs?little?to?no?maintenance.??There?were?two?types?of? liners?used:?PVC?and?polyester.??Each?performed?equally?as?well.? ? The?performance?of?synthetic?liners?without?a?protective...

Karimov, Askar; Leigh, Eric; Fipps, Guy

68

Greensburg Rebuilds Sustainably | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel Cell VehicleEnergyGreensburg Rebuilds Sustainably Greensburg

69

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2004 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eighth season (1997-2004) of adult Chinook salmon broodstock collection in the Lostine River and the sixth season (1999-2004) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progency for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2004, acclimation of Lostine River spring Chinook salmon smolts occurred from March 1, 2004 through to April 14, 2004 and a total of 250,249 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2002 egg source and included captive brood (133,781) and conventional (116,468) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2004 began May 10, the first Chinook was captured on May 19, 2004 and the last Chinook was captured on September 16, 2004. The weir and trap were removed on October 1, 2004. A total of 1,091 adult Chinook, including jacks, were captured during the season. The composition of the run included 299 natural origin fish and 792 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 46 natural and 69 hatchery supplementation adults were retained for broodstock and transported to Lookingglass Hatchery for holding and spawning, 537 adult Chinook were passed or transported above the weir to spawn naturally, and 447 hatchery origin adult Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 107 adults retained (eight additional hatchery females were collected and then later returned to the Lostine River to spawn naturally) for broodstock at Lookingglass Hatchery, 22 natural females and 30 supplementation females were represented in spawning. These females produced a total of 221,889 eggs at fertilization. Eye-up was 94.9% which yielded a total of 210,661 conventional program eyed eggs. The fecundity averaged 4,267 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage and then transferred to Oxbow Hatchery where they will be reared to the fingerling stage. They will then be transported back to LGH and reared to the smolt stage and then transported to the Lostine acclimation facility for release in the spring of 2006. Captive brood program eggs/fish will be added to

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

70

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2003 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the seventh season (1997-2003) of adult Chinook salmon broodstock collection in the Lostine River and the fifth season (1999-2003) of acclimating the resultant progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies. In 2003, acclimation of Lostine River spring Chinook salmon smolts occurred from March 3, 2003 through to April 14, 2003 and a total of 242,776 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2001 egg source and included captive broodstock (141,860) and conventional broodstock (100,916) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2003 began April 30th, the first Chinook was captured on May 16, 2003 and the last Chinook was captured on September 21, 2003. The weir and trap were removed on October 1, 2003. A total of 464 adult Chinook, including jacks, were captured during the season. The composition of the run included 239 natural origin fish and 225 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 45 natural and 4 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 366 adult Chinook were passed or transported above the weir to spawn naturally, and 49 hatchery origin adult jack Chinook were transported and outplanted in the Wallowa River and Bear Creek to spawn in underseeded habitat. Of the 49 adults retained for broodstock at Lookingglass Hatchery, 21 natural females and no hatchery origin females were represented in spawning. These females produced a total of 106,609 eggs at fertilization. Eye-up was 95.50% which yielded a total of 101,811 conventional program eyed eggs. The fecundity averaged 5,077 eggs per female. These eggs were incubated and at Lookingglass Hatchery until eyed stage. At eye they were transferred to Oxbow Hatchery where they were reared to the fingerling state at which time they were transported back to LGH until they were smolts in the spring of 2005. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2005.

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

71

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2007 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the eleventh season (1997-2007) of adult Chinook salmon broodstock collection in the Lostine River and the ninth season (1999-2007) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies In 2007, acclimation of Lostine River spring Chinook salmon smolts occurred from 3/5/07 through to 4/17/07 and a total of 230,010 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2005 egg source and included captive brood (24,604) and conventional (205,406) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2007 began May 14th. The first Chinook was captured on June 2, 2007 and the last Chinook was captured on September 25, 2007. The weir and trap were removed on October 1, 2007. A total of 637 adult Chinook, including jacks, were captured during the season. The composition of the run included 240 natural origin fish and 397 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 41 natural and 81 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning, 403 adult Chinook were passed or transported above the weir to spawn naturally, and only hatchery origin jack Chinook were transported and outplanted in the Wallowa River and Bear Creek in underseeded habitat. Of the 122 adult fish retained for broodstock, 20 natural females and 40 supplementation females were represented in spawning. The eggs from these females produced a total of 267,350 eggs at fertilization. Eye-up was 86.73% which yielded a total of 231,882 conventional program eyed eggs. The fecundity averaged 4,456 eggs per female. These eggs will be incubated and reared at Lookingglass Hatchery until they are smolts in the spring of 2009. Captive brood program eggs/fish will be added to the conventional program eggs to make up the entire juvenile release for the Lostine River program in 2009. Due to the success of the 2007 egg collection, the number of fish produced exceeded program needs and facility capabilities. As a result, there are plans to outplant fry in 2008 and parr in early 2009 to underseeded habitat in the Wallowa River.

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

72

Grande Ronde Endemic Spring Chinook Salmon Supplementation Project; Lostine River Operations and Maintenance 2006 Smolt Acclimation and Adult Return Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe (NPT), through funding provided by the Bonneville Power Administration (BPA), has implemented a Chinook salmon supplementation program (250,000 smolts) on the Lostine River, a tributary to the Grande Ronde River of Oregon. The Grande Ronde Endemic Spring Chinook Salmon Supplementation project, which involves supplementation of the Upper Grande Ronde River and Catherine Creek in addition to the Lostine River, was established to prevent extirpation and increase the number of threatened Snake River spring/summer Chinook salmon (Oncorhynchus tshawytscha) returning to the Grande Ronde River. This report covers the tenth season (1997-2006) of adult Chinook salmon broodstock collection in the Lostine River and the eighth season (1999-2006) of acclimation of resulting Lostine River progeny. Production of Lostine River spring Chinook salmon smolts currently occurs at Lookingglass Fish Hatchery (LGH). The Lostine River supplementation program utilizes two strategies to obtain egg source for production of smolts for supplementation: captive broodstock and conventional broodstock. The captive broodstock strategy involves (1) capture of natural juvenile spring Chinook salmon smolts from the Lostine River, (2) rearing those to adult and spawning them, and (3) rearing the resultant progeny for eventual acclimation and release back into the Lostine River. The conventional broodstock strategy involves (1) capture of natural and hatchery origin adults returning to the Lostine River, (2) holding those adults and spawning them, and (3) rearing the resultant progeny for acclimation and release back into the Lostine River. This report focuses on (1) the trapping and collection of adult spring Chinook salmon that return to the Lostine River, which provides the broodstock source for the conventional strategy and (2) the acclimation and release of juvenile spring Chinook salmon produced from the captive broodstock and conventional broodstock strategies In 2006, acclimation of Lostine River spring Chinook salmon smolts occurred from February 27, 2006 through to April 10, 2006 and a total of 240,568 smolts were acclimated and released. These smolts were produced from the brood year (BY) 2004 egg source and included captive brood (40,982) and conventional (199,586) origin smolts that were all progeny of Lostine River spring Chinook salmon. Operation of the Lostine River adult monitoring and collection facility in 2006 began May 15th, the first Chinook was captured on June 14, 2006 and the last Chinook was captured on September 27, 2006. The weir and trap were removed on October 1, 2006. A total of 534 adult Chinook, including jacks, were captured during the season. The composition of the run included 205 natural origin fish and 329 hatchery supplementation fish. There were no identified 'stray' hatchery fish from other programs trapped. Of the fish captured, 33 natural and 120 hatchery supplementation adults were retained for broodstock and transported to LGH for holding and spawning and 397 adult Chinook were passed or transported above the weir to spawn naturally. In 2006, no hatchery origin adult Chinook were transported and out planted in the Wallowa River and Bear Creek to spawn in under seeded habitat. In order to meet egg take goals for the conventional portion of the program, a determination was made that approximately 147 adults were needed for broodstock. As a result 16 (8 males and 8 females) of the 153 fish collected for broodstock were returned to the Lostine River to spawn naturally. Females that were spawned and provided the brood source were made up of 12 natural females and 45 supplementation females. One of these females tested positive for high levels of Bacterial Kidney Disease and consequently this females eggs were destroyed. The remaining females produced a total of 241,372 eggs at fertilization. Eye-up was 85.47% which yielded a total of 206,309 conventional program eyed eggs. The fecundity averaged 4,162 eggs per female. The brood year 2006 eggs will be incubated and reared at Lookingglass Hatchery until

Zollman, Richard L.; Eschler, Russell; Sealey, Shawn [Nez Perce Tribe

2009-03-31T23:59:59.000Z

73

Grand Challenges Special Solicitation The Office of Research and Sponsored Projects issues this Special Request for Proposals (RFP) related  

E-Print Network [OSTI]

Grand Challenges as "ambitious but achievable goals that harness science, technology, and innovation · Focused and specific · Harnessing innovation and advances in Science and Technology · Real Challenge (DOE) http://www1.eere.energy.gov/vehiclesandfuels/electric_vehicle s/index.html Asteroid Grand

Kreinovich, Vladik

74

Evaluation of Canal Lining Projects in the Lower Rio Grande Valley of Texas: 2011 Ratings and Analysis  

E-Print Network [OSTI]

IN THE LOWER RIO GRANDE VALLEY OF TEXAS 2011 Ratings and Analysis October 7, 2011 By Gabriele Bonaiti Extension Associate Askar Karimov Extension Associate Guy Fipps, P.E. Professor and Extension Agricultural Engineer... Texas AgriLife Extension Service Irrigation Technology Center Biological and Agricultural Engineering 2117 TAMU College Station, TX 77843?2117 979?845?3977; http://idea.tamu.edu - 3 - EXECUTIVE SUMMARY Since 1999, nine (9) irrigation...

Bonaiti, Gabriele; Karimov, Askar; Fipps, Guy

75

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington  

Broader source: Energy.gov [DOE]

This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

76

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThis EISStatementUtah,Department

77

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project,  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement | Department of333Energy

78

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and InterfacesAdministration - Rocky Mountain Lovell-Yellowtail

79

Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2002-2003 Annual Report.  

SciTech Connect (OSTI)

Since 1995, the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes) have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation concluded that entrainment at Grand Coulee Dam ranged from 211,685 to 576,676 fish annually. Further analysis revealed that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the second year of the study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory. The 2002 study period extended from May 18 through July 30. The objective of the study was to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout. The prototype system consisted of six strobe lights affixed to an aluminum frame suspended vertically underwater from a barge secured in the center of the entrance to the third powerplant forebay. The lights, controlled by a computer, were aimed to illuminate a specific region directly upstream of the barge. Three light level treatments were used: 6 of 6 lights on, 3 of 6 lights on, and all lights off. These three treatment conditions were applied for an entire 24-hr day and were randomly assigned within a 3-day block throughout the study period. A seven-transducer splitbeam hydroacoustic system was used to evaluate the effectiveness of the strobe lights in eliciting a negative phototactic response in fish. The transducers were deployed so they tracked fish entering and within the region illuminated by the strobe lights. Two of the seven transducers were mounted to the frame containing the strobe lights and were oriented horizontally. The remaining five transducers were spaced approximately 4 m apart on individual floating frames upstream of the barge, with the transducers looking vertically downward.

Johnson, R.; McKinstry, C.; Simmons, C. (Pacific Northwest National Laboratory)

2003-01-01T23:59:59.000Z

80

Rebuilding It Better: Greensburg, Kansas; High Performance Buildings Meeting Energy Savings Goals (Brochure) (Revised)  

SciTech Connect (OSTI)

This fact sheet provides a summary of how NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007.

Not Available

2012-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

From Tragedy to Triumph - Resources for Rebuilding Green after Disaster, EERE (Fact Sheet)  

SciTech Connect (OSTI)

Fact sheet offering resources for builders and architects to rebuild homes, businesses, and public buildings with energy efficiency and renewable energy such as wind, solar, and geothermal.

Not Available

2009-10-01T23:59:59.000Z

82

A Tale of Two Cities: Greensburg Rebuilds as a National Model...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Innovation, NREL (National Renewable Energy Laboratory) Leading the Nation in Clean Energy Deployment Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study;...

83

Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2003-2004 Annual Report.  

SciTech Connect (OSTI)

Since 1995, the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes) have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation from 1996 to 1999 determined that from 211,685 to 576,676 fish were entrained annually at Grand Coulee Dam. Analysis of the entrainment data found that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the third year of the strobe light study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory. The objective of the study is to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout under field conditions. The prototype system consists of six strobe lights affixed to an aluminum frame suspended 15 m vertically underwater from a barge secured in the center of the entrance to the third powerplant forebay. The lights, controlled by a computer, illuminate a region directly upstream of the barge. The 2003 study period extended from June 16 through August 1. Three light treatments were used: all six lights on for 24 hours, all lights off for 24 hours, and three of six lights cycled on and off every hour for 24 hours. These three treatment conditions were assigned randomly within a 3-day block throughout the study period. Hydroacoustic technology was used to evaluate the effectiveness of the strobe lights in eliciting a negative phototactic response in fish. The hydroacoustic system in 2003 comprised seven splitbeam transducers arrayed in front of the strobe lights, two multibeam transducers behind the lights, and a mobile splitbeam system. The seven splitbeam transducers were deployed so they tracked fish entering and within the region illuminated by the strobe lights. These transducers were spaced approximately 4 m apart on an aluminum frame floating upstream of the barge and looked vertically downward. The multibeam transducers monitored the distribution of fish directly behind and to both sides of the lights, while the mobile splitbeam system looked at the distribution of fish within the third powerplant forebay. To augment the hydroacoustic data, additional studies were conducted. The hydrodynamic characteristics of the third powerplant forebay were measured, and acoustically tagged juvenile kokanee were released upstream of the strobe lights and tracked within the forebay and downstream of the dam. Analysis of the effect of strobe lights on kokanee and rainbow trout focused on the number of fish detected in each of the areas covered by one of the downlooking transducers, the timing of fish arrivals after the status of the strobe lights changed, fish swimming effort (detected velocity minus flow velocity), and fish swimming direction. Water velocity measurements were used to determine fish swimming effort. The tracking of tagged kokanee provided data on fish movements into and out of the third powerplant forebay, including entrainment.

Simmons, M.; McKinstry, C.; Cook, C.

2004-01-01T23:59:59.000Z

84

Midway-Moxee Rebuild and Midway-Grandview Upgrade  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment SurfacesResource Program PreliminaryA3, 1999of Sciencemidway-moxee-rebuild Sign In

85

How Would You Rebuild a Town - Green? | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat Jump to:PhotonHolyName HousingIII Wind FarmWould You Rebuild a Town -

86

Final report on grand challenge LDRD project : a revolution in lighting : building the science and technology base for ultra-efficient solid-state lighting.  

SciTech Connect (OSTI)

This SAND report is the final report on Sandia's Grand Challenge LDRD Project 27328, 'A Revolution in Lighting -- Building the Science and Technology Base for Ultra-Efficient Solid-state Lighting.' This project, which for brevity we refer to as the SSL GCLDRD, is considered one of Sandia's most successful GCLDRDs. As a result, this report reviews not only technical highlights, but also the genesis of the idea for Solid-state Lighting (SSL), the initiation of the SSL GCLDRD, and the goals, scope, success metrics, and evolution of the SSL GCLDRD over the course of its life. One way in which the SSL GCLDRD was different from other GCLDRDs was that it coincided with a larger effort by the SSL community - primarily industrial companies investing in SSL, but also universities, trade organizations, and other Department of Energy (DOE) national laboratories - to support a national initiative in SSL R&D. Sandia was a major player in publicizing the tremendous energy savings potential of SSL, and in helping to develop, unify and support community consensus for such an initiative. Hence, our activities in this area, discussed in Chapter 6, were substantial: white papers; SSL technology workshops and roadmaps; support for the Optoelectronics Industry Development Association (OIDA), DOE and Senator Bingaman's office; extensive public relations and media activities; and a worldwide SSL community website. Many science and technology advances and breakthroughs were also enabled under this GCLDRD, resulting in: 55 publications; 124 presentations; 10 book chapters and reports; 5 U.S. patent applications including 1 already issued; and 14 patent disclosures not yet applied for. Twenty-six invited talks were given, at prestigious venues such as the American Physical Society Meeting, the Materials Research Society Meeting, the AVS International Symposium, and the Electrochemical Society Meeting. This report contains a summary of these science and technology advances and breakthroughs, with Chapters 1-5 devoted to the five technical task areas: 1 Fundamental Materials Physics; 2 111-Nitride Growth Chemistry and Substrate Physics; 3 111-Nitride MOCVD Reactor Design and In-Situ Monitoring; 4 Advanced Light-Emitting Devices; and 5 Phosphors and Encapsulants. Chapter 7 (Appendix A) contains a listing of publications, presentations, and patents. Finally, the SSL GCLDRD resulted in numerous actual and pending follow-on programs for Sandia, including multiple grants from DOE and the Defense Advanced Research Projects Agency (DARPA), and Cooperative Research and Development Agreements (CRADAs) with SSL companies. Many of these follow-on programs arose out of contacts developed through our External Advisory Committee (EAC). In h s and other ways, the EAC played a very important role. Chapter 8 (Appendix B) contains the full (unedited) text of the EAC reviews that were held periodically during the course of the project.

Copeland, Robert Guild; Mitchell, Christine Charlotte; Follstaedt, David Martin; Lee, Stephen Roger; Shul, Randy John; Fischer, Arthur Joseph; Chow, Weng Wah Dr.; Myers, Samuel Maxwell, Jr.; Thoma, Steven George; Gee, James Martin; Coltrin, Michael Elliott; Burdick, Brent A.; Salamone, Angelo, L., Jr.; Hadley, G. Ronald; Elliott, Russell D.; Campbell, Jonathan M.; Abrams, Billie Lynn; Wendt, Joel Robert; Pawlowski, Roger Patrick; Simpson, Regina Lynn; Kurtz, Steven Ross; Cole, Phillip James; Fullmer, Kristine Wanta; Seager, Carleton Hoover; Bogart, Katherine Huderle Andersen; Biefeld, Robert Malcolm; Kerley, Thomas M.; Norman, Adam K.; Tallant, David Robert; Woessner, Stephen Matthew; Figiel, Jeffrey James; Moffat, Harry K.; Provencio, Paula Polyak; Emerson, John Allen; Kaplar, Robert James; Wilcoxon, Jess Patrick; Waldrip, Karen Elizabeth; Rohwer, Lauren Elizabeth Shea; Cross, Karen Charlene; Wright, Alan Francis; Gonzales, Rene Marie; Salinger, Andrew Gerhard; Crawford, Mary Hagerott; Garcia, Marie L.; Allen, Mark S.; Southwell, Edwin T. (Perspectives, Sedona, AZ); Bauer, Tom M.; Monson, Mary Ann; Tsao, Jeffrey Yeenien; Creighton, James Randall; Allerman, Andrew Alan; Simmons, Jerry A.; Boyack, Kevin W.; Jones, Eric Daniel; Moran, Michael P.; Pinzon, Marcia J. (Perspectives, Sedona, AZ); Pinson, Ariane O. (Perspectives, Sedona, AZ); Miksovic, Ann E. (Perspectives, Sedona, AZ); Wang, George T.; Ashby, Carol Iris Hill; Missert, Nancy A.; Koleske, Daniel David; Rahal, Nabeel M.

2004-06-01T23:59:59.000Z

87

Sandia National Laboratories: Grand Challenge Laboratory-Directed...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grand Challenge Laboratory-Directed Research and Development project Recent Sandia Secure, Scalable Microgrid Advanced Controls Research Accomplishments On March 3, 2015, in...

88

Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet) (Revised)  

SciTech Connect (OSTI)

This fact sheet provides a summary of how DOE and NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007.

Not Available

2012-08-01T23:59:59.000Z

89

AbstractStock-rebuilding time iso pleths relate constant levels of fishing  

E-Print Network [OSTI]

519 Abstract­Stock-rebuilding time iso pleths relate constant levels of fishing mortality (F. Iso pleths calculated in previous studies by deterministic models approximate median, rather than mean

90

EIS-0400: EPA Notice of Availability of a Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0400: EPA Notice of Availability of a Draft Environmental Impact Statement Grandby Pumping Plant Switchyard Windy Gap Substation Transmission Line Rebuild Project, Grand...

91

Site-specific analysis of the cobbly soils at the Grand Junction processing site. [Uranium Mill Tailings Remedial Action (UMTRA) Project  

SciTech Connect (OSTI)

This report describes a recent site-specific analysis to evaluate the necessity of a recommendation to install a slurry trench around the Grand Junction processing site. The following analysis addresses the cobbly nature of the site's radiologically contaminated foundation soil, reassesses the excavation depths based on bulk radionuclide concentrations, and presents data-based arguments that support the elimination of the initially proposed slurry trench. The slurry trench around the processing site was proposed by the Remedial Action Contractor (RAC) to minimize the amount of water encountered during excavation. The initial depths of excavation developed during conceptual design, which indicated the need for a slurry wall, were reexamined as part of this analysis. This reanalysis, based on bulk concentrations of a cobbly subsoil, supports decreasing the original excavation depth, limiting the dewatering quantities to those which can be dissipated by normal construction activities. This eliminates the need for a slurry trench andseparate water treatment prior to permitted discharge.

Not Available

1992-06-01T23:59:59.000Z

92

The Brazos Valley Energy Conservation Coalition, Part of the Rebuild America Program in Texas: Program Update  

E-Print Network [OSTI]

-five of these facilities have authorized BVECC to conduct walk-through audits, and fourteen preliminary walkthrough audits have been performed. As of June 1999, nine facilities have joined the Rebuild America program covering a total of 8 million square feet of conditioned...

Yazdani, B.; Haberl, J. S.; Culp, C.; Turner, W. D.; Claridge, D. E.; Myers, M.

2000-01-01T23:59:59.000Z

93

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

94

Rebuilding After Disaster: Going Green from the Ground Up (Revised) (Brochure)  

SciTech Connect (OSTI)

20-page "how-to" guide describing ways to turn a disaster into an opportunity to rebuild with greener energy technologies. It covers such topics as the importance of energy, options for communities, instructions for developing an energy plan, and other considerations. This guide is intended for the community leaders who have experienced a disaster.

Not Available

2009-10-01T23:59:59.000Z

95

Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay, 2005-2006 Annual Report.  

SciTech Connect (OSTI)

The construction of Grand Coulee and Chief Joseph dams on the Columbia River resulted in the complete extirpation of the anadromous fishery upstream of these structures. Today, this area is totally dependent upon resident fish resources to support local fisheries. The resident fishing is enhanced by an extensive stocking program for target species in the existing fishery, including kokanee (Oncorhynchus nerka kennerlyi) and rainbow trout (O. mykiss). The kokanee fishery in Lake Roosevelt has not been meeting the return goals set by fisheries managers despite the stocking program. Investigations of physical and biological factors that could affect the kokanee population found predation and entrainment had a significant impact on the fish population. In 1999 and 2000, walleye (Sander vitreum) consumed between 15% and 9%, respectively, of the hatchery kokanee within 41 days of their release, while results from a study in the late 1990s estimated that entrainment at Grand Coulee Dam could account for up to 30% of the total mortality of the stocked fish. To address the entrainment loss, the Bonneville Power Administration commissioned a study to determine if fish would avoid areas illuminated by strobe lights in the forebay of the third powerplant. This work was conducted by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes). From 2002 through 2004, six strobe lights were suspended in the center of the opening to the third powerplant forebay during summer months. Results from those studies indicated that fish appeared to be attracted to the illuminated area but only at night and when flow conditions within the third powerplant forebay were minimal. However, small but consistent results from these studies indicated that under high flow conditions, fish might be avoiding the lights. The 2005 study was designed to examine whether, under high flow conditions near the penstock openings, fish would avoid the lighted regions. Four omnidirectional strobe lights were deployed on the one trash rack directly in front of one turbine penstock. Seven splitbeam transducers were deployed to monitor fish approaching three penstock openings either from in front of the trash racks or moving down the dam behind the trash racks. Four key results emerged from the 2005 study. The results provide insight into the current level of entrainment and how fish respond to strobe lights under high flow conditions. First, very few fish were detected inside the trash racks. Of the more than 3,200 targets identified by the data processing, less than 100 were detected inside the trash racks. Only 23 fish were found inside the trash racks behind the strobe lights. Of those 21 fish, 13 were detected when the lights were on. Most of the fish detected behind the trash racks were above the turbine penstock but were headed downward. No fish were detected at night when minimal flows occurred between midnight and 4:00 a.m. Second, significantly more fish (P < 0.001) were detected in front of the trash racks when the lights were on at night. On a count-per-hour basis, the difference between lights off and lights on was apparent in the early morning hours at depths between 25 m and 50 m from the transducers. The lights were approximately 34 m below the splitbeam transducers, and fish detected at night with lights on were found at a median depth of approximately 35 m, compared to a median depth of from 20.6 to 23.5 m when the lights were off. The differences in depth between lights on and off at night were also significant (P < 0.001). Additionally, the increase in fish occurred only in front of the trash rack where the strobe lights were mounted; there was no increase in the number of detections by the transducers aimed away from the lights. Third, fish clearly manifested a behavioral response to the strobe lights during the day. When the lights were on, fish detected by three of the four transducers generally were swimming north, parallel to the face of the dam. Howeve

Simmons, M.; Johnson, Robert; McKinstry, C. [Pacific Northwest National Laboratory

2006-03-01T23:59:59.000Z

96

EA-1037: Uranium Lease Management Program, Grand Junction, Colorado  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of the U.S. Department of Energy's Grand Junction Projects Office's proposal to maintain and preserve the nation's immediately accessible supply of...

97

Monitoring and Evaluation of Supplemented Spring Chinook Salmon and Life Histories of Wild Summer Steelhead in the Grande Ronde Basin, 2007 Annual Report.  

SciTech Connect (OSTI)

This is the ninth annual report for a multi-year project designed to monitor and evaluate supplementation of endemic spring Chinook salmon in Catherine Creek and the upper Grande Ronde River. These two streams historically supported anadromous fish populations that provided significant tribal and non-tribal fisheries, but in recent years, have experienced severe declines in abundance. Conventional and captive broodstock supplementation methods are being used to restore these spring Chinook salmon populations. Spring Chinook salmon populations in Catherine Creek and the upper Grande Ronde River, and other streams in the Snake River Basin have experienced severe declines in abundance over the past two decades (Nehlsen et al. 1991). A supplementation program was initiated in Catherine Creek and the upper Grande Ronde River, incorporating the use of both captive and conventional broodstock methods, in order to prevent extinction in the short term and eventually rebuild populations. The captive broodstock component of the program (BPA Project 199801001) uses natural-origin parr collected by seining and reared to maturity at facilities near Seattle, Washington (Manchester Marine Laboratory) and Hood River, Oregon (Bonneville Hatchery). Spawning occurs at Bonneville Hatchery, and resulting progeny are reared in hatcheries. Shortly before outmigration in the spring, juveniles are transferred to acclimation facilities. After an acclimation period of about 2-4 weeks, volitional release begins. Any juveniles remaining after the volitional release period are forced out. The conventional broodstock component uses returning adults collected at traps near the spawning areas, transported to Lookingglass Hatchery near Elgin, Oregon, held, and later spawned. The resulting progeny are reared, acclimated, and released similar to the captive broodstock component. All progeny released receive one or more marks including a fin (adipose) clip, codedwire tag, PIT tag, or visual implant elastomer tag. The numbers of adults used for conventional broodstock are determined by an agreement among comanagers (Zimmerman and Patterson 2002). Activities for this project focus on two life stages of spring Chinook salmon: juveniles during the migration from freshwater to the ocean and adults during prespawning migration through the end of spawning. Life history, production, and genetics are monitored and used to evaluate program effectiveness.

Boe, Stephen J.; Crump, Carrie A.; Weldert, Rey L. [Confederated Tribes of the Umatilla Indian Reservation

2009-04-10T23:59:59.000Z

98

EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line, Benton and Yakima Counties, Washington  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 34-mile Midway-Moxee transmission line in Benton and Yakima Counties, Washington.

99

EIS-0344: Grand Coulee-Bell 500 kV Transmission Line  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's proposed action for the construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project.

100

MALE RIO GRANDE WILD TURKEY  

E-Print Network [OSTI]

217 MALE RIO GRANDE WILD TURKEY HABITAT CHARACTERISTICS IN THE TEXAS PANHANDLE AND SOUTHWESTERN Rio Grande wild turkeys (Meleagris gallopavo intermedia) in the northern extent of their native range habitat used for different behaviors (displaying, loafing, and foraging) by male Rio Grande wild turkeys

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Rebuilding for Sustainability: Case Studies in the Making (Presentation)  

SciTech Connect (OSTI)

NREL has made significant contributions to communities suffering from natural disasters since 2007 in terms of technical assistance regarding energy efficiency and renewable energy options. NREL's work has covered all aspects of energy, including energy opportunities in community planning, policy design, new program design, and specific project design and implementation for energy related to electricity generation, building energy use, and transportation. This presentation highlights work done in New Orleans following Hurricane Katrina; Greensburg, Kansas, following a devastating tornado; and New York and New Jersey following Hurricane Sandy.

Billman, L.

2013-06-01T23:59:59.000Z

102

DOE Grand Junction Projects Office Edgemont LTSP  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou areDowntownRocky FlatsOhio > Fernald 1325.8.DOE

103

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky LearningGet AssistanceCatalytic SitesEmployee,Energy

104

DOE Announces Three Projects to Help the Gulf Coast Recover and Rebuild |  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart GridThirdPartnershipDrillingRFI on RareCold War

105

EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire,  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office of Audit ServicesMirant PotomacFinal Environmental891: Sempra EnergyFinding of

106

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton,  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office of Audit ServicesMirant PotomacFinal1935: Final EnvironmentalBatavia,946:Marion, and

107

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County,  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office of Audit ServicesMirant PotomacFinal1935: FinalDraft

108

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office of Audit ServicesMirant PotomacFinal1935: FinalDraftDraftB Minnesota PowerPolson,

109

EA-1987: Parker-Headgate Rock and Parker-Bouse Rebuild Project, Arizona and  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office of Audit ServicesMirant PotomacFinal1935:Department of

110

GRAND CHALLENGE PROBLEMS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickr Flickr Editor's note:ComputingFusionSanGE Global40-DOP (5-2011)GRAND

111

Grand Challenge Portfolio: Driving Innovations in Industrial...  

Broader source: Energy.gov (indexed) [DOE]

Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January 2011 Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January...

112

MHK Projects/Grand Manan Channel Project | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpIncMAK Technologies Jump to:BW2 TidalMarFalmouthVinalhaven MEBRIManan

113

EIS-0485: Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska  

Broader source: Energy.gov [DOE]

DOE’s Western Area Power Administration is preparing an EIS to evaluate the environmental impacts of interconnecting the proposed Grande Prairie Wind Farm, in Holt County, near O’Neill, Nebraska, to Western’s power transmission system. The project website is http://www.wapa.gov/ugp/Environment/GrandePrairie.htm.

114

Nuclear Proliferation and Grand Challenges  

ScienceCinema (OSTI)

Nuclear engineer Dr. Kathy McCarthy leads systems analysis. She talks about proliferation and the grand challenges of nuclear R&D. For more information about INL energy research, visit http://www.facebook.com/idahonationallaboratory.

McCarthy, Kathy

2013-05-28T23:59:59.000Z

115

Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009 (Report and Appendices)  

SciTech Connect (OSTI)

This comprehensive case study describes technical assistance provided by NREL to help Greensburg, Kansas, rebuild as a green community after an EF-5 tornado nearly leveled the town in 2007.

Billman, L.

2009-11-01T23:59:59.000Z

116

Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009; Appendices  

Office of Energy Efficiency and Renewable Energy (EERE)

This comprehensive case study describes technical assistance provided by NREL to help Greensburg, Kansas, rebuild as a green community after an EF-5 tornado nearly leveled the town in 2007.

117

Investigations into the Early Life History of Naturally Produced Spring Chinook Salmon and Summer Steelhead in the Grande Ronde River Subbasin, Annual Report 2008 : Project Period 1 February 2008 to 31 January 2009.  

SciTech Connect (OSTI)

This study was designed to document and describe the status and life history strategies of spring Chinook salmon and summer steelhead in the Grande Ronde River Subbasin. We determined migration timing, abundance, and life-stage survival rates for juvenile spring Chinook salmon Oncorhynchus tshawytscha and summer steelhead O. mykiss in four streams during migratory year 2008 from 1 July 2007 through 30 June 2008. As observed in previous years of this study, spring Chinook salmon and steelhead exhibited fall and spring movements out of natal rearing areas, but did not begin their smolt migration through the Snake and lower Columbia River hydrosystem until spring. In this report we provide estimates of migrant abundance and migration timing for each study stream, and their survival and timing to Lower Granite Dam. We also document aquatic habitat conditions using water temperature and stream flow in four study streams in the subbasin.

Yanke, Jeffrey A.; Alfonse, Brian M.; Bratcher, Kyle W. [Oregon Department of Fish and Wildlife

2009-07-31T23:59:59.000Z

118

The Development of a Coordinated Database for Water Resources and Flow Model in the Paso Del Norte Watershed (Phase III) Part II Availability of Flow and Water Quality Data for the Rio Grande Project Area  

E-Print Network [OSTI]

Cruces, NM 88003 (575) 646-4337 i i Acknowledgement This document and the underlying pr oject activities detailed in this report reflect the joint efforts of many people working with the Paso del Norte Watershed Council (PdNWC). The authors... wish to acknowledge and extend our grat itude to the U.S. Army Corps of Engineers for the generous financial support extende d to the PdNWC for development of the Coordinated Water Resources Database and Model Developm ent Project (called Project...

Tillery, Sue; Sheng, Zhuping; King, J. Phillip; Creel, Bobby; Brown, Christopher; Michelsen, Ari; Srinivasan, Raghavan; Granados, Alfredo

2009-01-01T23:59:59.000Z

119

The Lifetime of Grand Design  

E-Print Network [OSTI]

The lifetime of the structure in grand design spiral galaxies is observationally ill-determined, but is essentially set by how accurately the pattern's rotation can be characterized by a single angular pattern speed. This paper derives a generalized version of the Tremaine-Weinberg method for observationally determining pattern speeds, in which the pattern speed is allowed to vary arbitrarily with radius. The departures of the derived pattern speed from a constant then provides a simple metric of the lifetime of the spiral structure. Application of this method to CO observations of NGC 1068 reveal that the pattern speed of the spiral structure in this galaxy varies rapidly with radius, and that the lifetime of the spiral structure is correspondingly very short. If this result turns out to be common in grand-design spiral galaxies, then these features will have to be viewed as highly transient phenomena.

M. R. Merrifield; R. J. Rand; S. E. Meidt

2005-11-02T23:59:59.000Z

120

Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.  

SciTech Connect (OSTI)

The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

Ashley, Paul

1992-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Grande  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky LearningGet AssistanceCatalytic

122

Economic and Conservation Evaluation of Capital Renovation Projects: Cameron County Irrigation District No. 2 (San Benito) – Interconnect Between Canals 39 and 13-A1 and Replacement of Rio Grande Diversion Pumping Plant  

E-Print Network [OSTI]

of the Bureau of Reclamation’s evaluation of proposed projects: c60 Number of acre-feet of water saved per dollar of construction costs; c60 Number of British Thermal Units (BTU) of energy saved per dollar of construction costs; and c60 Dollars of annual... Documentation for Sonia Kaniger, March, 2003 Manager, Cameron County Irrigation District No. 2 (San Benito) page ii of 82 associated with energy savings. There are energy savings both from pumping less water forthcoming from reducing leaks and from improving...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

2003-01-01T23:59:59.000Z

123

Savings Along the Rio Grande  

E-Print Network [OSTI]

-feet of water per year from canal replacement, lining and/or seepage- loss testing. In addition, technical support from Extension engineers have saved districts more than $180,000 on engineering services. On-farm studies resulted in an average 25 percent...tx H2O | pg. 22 Conserving water is vital for the Rio GrandeBasin, one of the most productive agriculturalareas in the United States. Irrigated agricul- ture claims 85 percent of its water, and urban water use is expected to double in the next 50...

Supercinski, Danielle

2007-01-01T23:59:59.000Z

124

Grand Challenges of Enterprise Integration  

SciTech Connect (OSTI)

Enterprise Integration connects and combines people, processes, systems, and technologies to ensure that the right people and the right processes have the right information and the right resources at the right time. A consensus roadmap for Technologies for Enterprise Integration was created as part of an industry/government/academia partnership in the Integrated Manufacturing Technology Initiative (IMTI). Two of the grand challenges identified by the roadmapping effort will be addressed here--Customer Responsive Enterprises and Totally Connected Enterprises. Each of these challenges is briefly discussed as to the current state of industry and the future vision as developed in the roadmap.

Brosey, W.D; Neal, R.E.; Marks, D.

2001-04-01T23:59:59.000Z

125

<GrandPrairie>  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered‰PNGExperience hands-onASTROPHYSICSHe β- DecayBe GeneralHeating DegreeGrande

126

Project Summary This project is to investigate how hypoxia affects the production of specific types of  

E-Print Network [OSTI]

Project Summary This project is to investigate how hypoxia affects the production of specific and established procedures in the GrandeAllen lab. The figure below outlines the experimental setup

Richards-Kortum, Rebecca

127

Rebuilding After Disaster: Going Green from the Ground Up (Revised) (Brochure), U.S. Department of Energy (DOE), Energy Efficiency & Renewable Energy (EERE)  

Office of Energy Efficiency and Renewable Energy (EERE)

20-page “how-to” guide describing ways to turn a disaster into an opportunity to rebuild with greener energy technologies. It covers such topics as the importance of energy, options for communities, instructions for developing an energy plan, and other considerations. This guide is intended for the community leaders who have experienced a disaster.

128

From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE (Fact Sheet)  

SciTech Connect (OSTI)

Fact sheet offering practical information about building energy efficient buildings and using renewable energy. Includes a checklist and resources. Highlights successful projects in Greensburg, Kansas.

Not Available

2009-10-01T23:59:59.000Z

129

U.S. Energy Secretary Steven Chu to Help Rebuild Homes in New...  

Broader source: Energy.gov (indexed) [DOE]

group that helps find meaningful work for service men and women, St. Bernard Project trains and employs injured active duty soldiers and veterans in transition after their...

130

Evaluate Potential Means of Rebuilding Sturgeon Populations in the Snake River between Lower Granite and Hells Canyon Dams, 1997 Annual Report.  

SciTech Connect (OSTI)

During 1997 the first phase of the Nez Perce Tribe White Sturgeon Project was completed and the second phase was initiated. During Phase I the ''Upper Snake River White Sturgeon Biological Assessment'' was completed, successfully: (1) compiling regional white sturgeon management objectives, and (2) identifying potential mitigation actions needed to rebuild the white sturgeon population in the Snake River between Hells Canyon and Lower Granite dams. Risks and uncertainties associated with implementation of these potential mitigative actions could not be fully assessed because critical information concerning the status of the population and their habitat requirements were unknown. The biological risk assessment identified the fundamental information concerning the white sturgeon population that is needed to fully evaluate the effectiveness of alternative mitigative strategies. Accordingly, a multi-year research plan was developed to collect specific biological and environmental data needed to assess the health and status of the population and characterize habitat used for spawning and rearing. In addition, in 1997 Phase II of the project was initiated. White sturgeon were captured, marked, and population data were collected between Lower Granite Dam and the mouth of the Salmon River. During 1997, 316 white sturgeon were captured in the Snake River. Of these, 298 were marked. Differences in the fork length frequency distributions of the white sturgeon were not affected by collection method. No significant differences in length frequency distributions of sturgeon captured in Lower Granite Reservoir and the mid- and upper free-flowing reaches of the Snake River were detected. The length frequency distribution indicated that white sturgeon between 92 and 183 cm are prevalent in the reaches of the Snake River that were sampled. However, white sturgeon >183 have not changed markedly since 1970. I would speculate that some factor other than past over-fishing practices is limiting the recruitment of white sturgeon into larger size classes (>183 cm). Habitat, food resources, and migration have been severely altered by the impoundment of the Snake River and it appears that the recruitment of young may not be severely affected as recruitment of fish into size classes > 183 cm.

Hoefs, Nancy (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

2004-02-01T23:59:59.000Z

131

Grand Challenges in Data Usage Control  

E-Print Network [OSTI]

Grand Challenges in Data Usage Control Prof. Ravi Sandhu Institute for Cyber Security Prof. Ravi.ics.utsa.edu © Ravi Sandhu World-Leading Research with Real Grand Challenges in Data Usage Control . Ravi Sandhu is about tradeoffs confidentiality, integrity, availability, usage, privacy, cost, usability, productivity

Sandhu, Ravi

132

2014 SunShot Grand Challenge Summit Opening Session Photos |...  

Broader source: Energy.gov (indexed) [DOE]

Opening Session Photos 2014 SunShot Grand Challenge Summit Opening Session Photos Addthis SunShot Grand Challenge Summit Opening Session 1 of 35 SunShot Grand Challenge Summit...

133

United States Department of Energy, Grand Junction Office  

SciTech Connect (OSTI)

The Grand Junction Office (GJO), US Department of Energy (DOE), develops and administers programs for evaluating domestic uranium resources and the production capability of industry; for developing resource planning information for DOE; and for advancing geologic and geophysical exploration concepts and techniques. In addition, GJO administers the leasing of mineral lands under DOE control, and carries out activities relating to the environmental aspects of uranium mining and milling, including remedial programs. The Office is staffed by administrative and technical program-management personnel. Bendix Field Engineering Corporation (Bendix) is the DOE operating contractor at the Grand Junction, Colorado, Government-owned/contractor-operated (GOCO) facility. The technical staffs of both GJO and Bendix are primarily geoscience-oriented. Specifically during 1980, uranium resource assessment on 135 National Topographic Map Series (NTMS) quadrangles was completed, along with other specific studies, to yield October 1980 national resource estimates. In addition, updated uranium supply analysis and production capability projections were completed. Another key aspect of this successful program was the development of improved geophysical and geochemical equipment and techniques in support of uranium resource assessment. Much of the hardware and know-how developed was turned over to the public and to the uranium industry at large for application to uranium exploration and the assessment of uranium company resources. The Grand Junction Office also participated actively during 1980 in international cooperative research on uranium exploration techniques and on the geology of uranium deposits.

Not Available

1980-01-01T23:59:59.000Z

134

Grande Ronde Basin Supplementation Program; Lostine River, 2001 Annual Report.  

SciTech Connect (OSTI)

The Northwest Power Planning Council (NPPC) identified supplementation as a high priority to achieve its goal of increasing runs of anadromous fish in the Columbia Basin. Supplementation activities in the Lostine River and associated monitoring and evaluation conducted by the Nez Perce Tribe relate directly to the needs addressed in the Columbia River Basin Fish and Wildlife Program (NPPC 1994). Measure 7.4L.1 of the Program mandates that appropriate research accompany any proposed supplementation. In addition, measure 7.3B.2 of the Program stresses the need for evaluating supplementation projects to assess their ability to increase production. Finally, Section 7.4D.3 encourages the study of hatchery rearing and release strategies to improve survival and adaptation of cultured fish. In 1997, Oregon Department of Fisheries and Wildlife (ODFW) requested a modification of Permit 1011 to allow the take of adult spring chinook salmon. In 1998, the Nez Perce Tribe also requested a permit specific to activities on Lostine River. The permit was issued in 2000. A special condition in the permits required the development of a long term management plan for the spring chinook salmon of the Grande Ronde Basin. The Nez Perce Tribe, ODFW, and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) completed a formal long range plan entitled ''Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program''. The program proposes to increase the survival of spring chinook salmon in the Grand Ronde Basin through hatchery intervention. Adult salmon from the Lostine River, Catherine Creek, and the Upper Grande Ronde River are used for a conventional supplementation program in the basin. The Nez Perce program currently operates under the ESA Section 10 Permit 1149.

Onjukka, Sam T. (Oregon Department of Fish and Wildlife, Portland, OR); Harbeck, Jim (Nez Perce Tribe, Department of Fisheries Resource Management, Enterprise, OR)

2003-03-01T23:59:59.000Z

135

Grande Ronde Basin Supplementation Program; Lostine River, 2000 Annual Report.  

SciTech Connect (OSTI)

The Northwest Power Planning Council (NPPC) identified supplementation as a high priority to achieve its goal of increasing runs of anadromous fish in the Columbia Basin. Supplementation activities in the Lostine River and associated monitoring and evaluation conducted by the Nez Perce Tribe relate directly to the needs addressed in the Columbia River Basin Fish and Wildlife Program (NPPC 1994). Measure 7.4L.1 of the Program mandates that appropriate research accompany any proposed supplementation. In addition, measure 7.3B.2 of the Program stresses the need for evaluating supplementation projects to assess their ability to increase production. Finally, Section 7.4D.3 encourages the study of hatchery rearing and release strategies to improve survival and adaptation of cultured fish. In 1997, Oregon Department of Fisheries and Wildlife (ODFW) requested a modification of Permit 1011 to allow the take of adult spring chinook salmon. In 1998, the Nez Perce Tribe also requested a permit specific to activities on Lostine River. The permit was issued in 2000. A special condition in the permits required the development of a long term management plan for the spring chinook salmon of the Grande Ronde Basin. The Nez Perce Tribe, ODFW, and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) completed a formal long range plan entitled ''Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program''. The program proposes to increase the survival of spring chinook salmon in the Grand Ronde Basin through hatchery intervention. Adult salmon from the Lostine River, Catherine Creek, and the Upper Grande Ronde River are used for a conventional supplementation program in the basin. The Nez Perce program currently operates under the ESA Section 10 Permit 1149.

Onjukka, Sam T. (Oregon Department of Fish and Wildlife, Portland, OR); Harbeck, Jim (Nez Perce Tribe, Department of Fisheries Resource Management, Enterprise, OR)

2003-03-01T23:59:59.000Z

136

'Grand Challenge' for Basic and Applied Research in Hydrogen...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

'Grand Challenge' for Basic and Applied Research in Hydrogen Storage Solicitation 'Grand Challenge' for Basic and Applied Research in Hydrogen Storage Solicitation DOE is issuing a...

137

Grand Challenge for Basic and Applied Research in Hydrogen Storage...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Storage: Statement of Objectives Grand Challenge for Basic and Applied Research in Hydrogen Storage: Statement of Objectives Statement of objectives for the Grand Challenge for...

138

EV Everywhere EV Everywhere Grand Challenge - Electric Drive...  

Broader source: Energy.gov (indexed) [DOE]

EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop Agenda EV Everywhere EV Everywhere Grand Challenge - Electric Drive (Power...

139

EV Everywhere Grand Challenge - Battery Workshop attendees list...  

Broader source: Energy.gov (indexed) [DOE]

EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop EV Everywhere Grand Challenge Introduction for Electric Drive Workshop...

140

2014 Race to Zero Student Design Competition: Grand Winner Teams...  

Office of Environmental Management (EM)

2014 Race to Zero Student Design Competition: Grand Winner Teams 2014 Race to Zero Student Design Competition: Grand Winner Teams 2014 Race to Zero Student Design Competition:...

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Aspects of grand unified and string phenomenology  

E-Print Network [OSTI]

Explored in this report is the essential interconnectedness of Grand Unified and String Theoretic Phenomenology. In order to extract a modeled connection to low-energy physics from the context of superstring theory, it is presently necessary...

Walker, Joel Wesley

2005-11-01T23:59:59.000Z

142

BPA and partners surmount unique obstacles on Grand Coulee project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Articles (by tag) Lineman shares life-saving skills with electrical workers in Suriname Thursday, January 08, 2015 NWPPA spotlights synchrophasors, energy-saving competition...

143

Hydrogen Storage Grand Challenge Individual Projects | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensional Subject:GroundtoProduction TechnicalSensor WorkshopM M a a

144

Grand Ridge Elementary Wind Project | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat Jump to:Photon Place: Golden, COIndiana Jump to:

145

Grande Ronde Basin Chinook Salmon Captive Brood and Conventional Supplementation Program, 2000 Annual Report.  

SciTech Connect (OSTI)

Endangered Species Permit Number 1011 (formerly Permit No. 973) authorizes ODFW to take listed spring chinook salmon juveniles from Catherine Creek (CC), Lostine River (LR) and Grande Ronde River (GR) for research and enhancement purposes. Modification 2 of this permit authorizes ODFW to take adults for spawning and the production and release of smolts for the Captive and Conventional broodstock programs. This report satisfies the requirement that an annual report be submitted. Herein we report on activities conducted and provide cursory data analyses for the Grande Ronde spring chinook salmon Captive and Conventional broodstock projects from 1 January-31 December 2000.

Carmichael, Richard W. (Oregon Department of Fish and Wildlife, La Grande, OR)

2003-03-01T23:59:59.000Z

146

CTUIR Grande Ronde River Watershed Restoration Program McCoy Creek/McIntyre Creek Road Crossing, 1995-1999 Progress Report.  

SciTech Connect (OSTI)

The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Bonneville Power Administration (BPA) entered into a contract agreement beginning in 1996 to fund watershed restoration and enhancement actions and contribute to recovery of fish and wildlife resources and water quality in the Grande Ronde River Basin. The CTUIR's habitat program is closely coordinated with the Grande Ronde Model Watershed Program and multiple agencies and organizations within the basin. The CTUIR has focused during the past 4 years in the upper portions of the Grande Ronde Subbasin (upstream of LaGrande, Oregon) on several major project areas in the Meadow, McCoy, and McIntyre Creek watersheds and along the mainstem Grande Ronde River. This Annual Report provides an overview of individual projects and accomplishments.

Childs, Allen B.

2000-08-01T23:59:59.000Z

147

Rio Grande sediment study -- Supply and transport  

SciTech Connect (OSTI)

The 1992 New Mexico State Legislature directed the Interstate Stream Commission (ISC) to study the feasibility of clearing and deepening the channel of the Rio Grande between Albuquerque and Elephant Butte to improve water conveyance and water conservation. The ISC requested the US Army Corps of Engineers-Albuquerque District (COE) to undertake this study under the Planning Assistance to States Program. The study was divided into two phases. Phase 1 consisted of an analysis of the sediment contribution to the Rio grande from the tributaries and an evaluation of the existing US Geological Survey (USGS) sediment gage data. Phase 2 will be an analysis, through the use of an HEC-6, Scour and Deposition in Rivers and Reservoirs, computer model, to determine the long-term performance of any Rio Grande channel improvements. This narrative presents the Phase 1 methods and results.

Diniz, E. [Resource Technology, Inc., Albuquerque, NM (United States); Eidson, D.; Bourgeois, M. [Army Corps of Engineers, Albuquerque, NM (United States)

1995-12-31T23:59:59.000Z

148

Grand Ridge Wind Farm | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat Jump to:Photon Place: Golden, COIndiana Jump to:Grand Ridge II WindGrand

149

Grande Ronde Basin Chinook Salmon Captive Brood and Conventional Supplementation Programs, 2002 Annual Report.  

SciTech Connect (OSTI)

Endangered Species Permit Number 1011 (formerly Permit No. 973) authorizes ODFW to take listed spring chinook salmon juveniles from Catherine Creek (CC), Lostine River (LR) and Grande Ronde River (GR) for research and enhancement purposes. Modification 2 of this permit authorizes ODFW to take adults for spawning and the production and release of smolts for the Captive and Conventional broodstock programs. This report satisfies the requirement that an annual report be submitted. Herein we report on activities conducted and provide cursory data analyses for the Grande Ronde spring chinook salmon Captive and Conventional broodstock projects from 1 January-31 December 2002. The Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Project is designed to rapidly increase numbers of salmon in stocks that are in imminent danger of extirpation. Parr are captured in Catherine Creek, upper Grande Ronde River and Lostine River and reared to adulthood in captivity. Upon maturation, they are spawned (within stocks) and their progeny reared to smoltification before being released into the natal stream of their parents. This program is co-managed by ODFW, National Marine Fisheries Service, the Nez Perce Tribe and Confederated Tribes of the Umatilla Indian Reservation.

Carmichael, Richard W. (Oregon Department of Fish and Wildlife, La Grande, OR)

2003-07-01T23:59:59.000Z

150

Team Kentucky Awards: 2013 INTEL Grand Awards  

E-Print Network [OSTI]

Team Kentucky Awards: 2013 INTEL Grand Awards Second Award of $1,500: Energy and Transportation, Lexington, Kentucky Second Award of $1,500: Environmental Sciences An Inquiry into the Effect High School, Louisville, Kentucky Third Award of $1,000: Engineering: Materials and Bioengineering

Cooper, Robin L.

151

Evaluate Potential Means of Rebuilding Sturgeon Populations in the Snake River between Lower Granite and Hells Canyon Dams, 2000 Annual Report.  

SciTech Connect (OSTI)

The specific research goal of this project is to identify means to restore and rebuild the Snake River white sturgeon (Acipenser transmontanus) population to support a sustainable annual subsistence harvest equivalent to 5 kg/ha/yr (CBFWA 1997). Based on data collected, a white sturgeon adaptive management plan will be developed. This 2000 annual report covers the fourth year of sampling of this multi-year study. In 2000 white sturgeon were captured, marked, and population data were collected in the Snake and Salmon rivers. The Snake River was sampled between Lower Granite Dam (rkm 174) and the mouth of the Salmon River (rkm 303), and the Salmon River was sampled from its mouth upstream to Hammer Creek (rkm 84). A total of 53,277 hours of setline effort and 630 hours of hook-and-line effort was employed in 2000. A total of 538 white sturgeon were captured and tagged in the Snake River and 25 in the Salmon River. Since 1997, 32.8 percent of the tagged white sturgeon have been recaptured. In the Snake River, white sturgeon ranged in total length from 48 cm to 271 cm and averaged 107 cm. In the Salmon River, white sturgeon ranged in total length from 103 cm to 227 cm and averaged 163 cm. Using the Jolly-Seber open population estimator, the abundance of white sturgeon <60 cm, between Lower Granite Dam and the mouth of the Salmon River, was estimated at 2,725 fish, with a 95% confidence interval of 1,668-5,783. A total of 10 white sturgeon were fitted with radio-tags. The movement of these fish ranged from 54.7 km (34 miles) downstream to 78.8 km (49 miles) upstream; however, 43.6 percent of the detected movement was less than 0.8 km (0.5 mile). Both radio-tagged fish and recaptured white sturgeon in Lower Granite Reservoir appear to move more than fish in the free-flowing segment of the Snake River. No seasonal movement pattern was detected, and no movement pattern was detected for different size fish. Differences were detected in the length frequency distributions of white sturgeon in Lower Granite Reservoir and the free-flowing Snake River (Chi-Square test, P<0.05). The proportion of white sturgeon greater than 92 cm (total length) in the free-flowing Snake River has shown an increase of 31 percent since the 1970's. Analysis of the length-weight relationship indicated that white sturgeon in Lower Granite Reservoir had a higher relative weight factor than white sturgeon in the free-flowing Snake River. A von Bertalanffy growth curve was fitted to 138 aged white sturgeon. The results suggests fish are currently growing faster than fish historically inhabiting the study area, as well as other Columbia River basin white sturgeon populations. Artificial substrate mats were used to document white sturgeon spawning. A total of 34 white sturgeon eggs were recovered: 27 in the Snake River, and seven in the Salmon River.

Everett, Scott R.; Tuell, Michael A. (Nez Perce Tribe, Department of Fishereis Resource Management, Lapwai, ID)

2003-03-01T23:59:59.000Z

152

Evaluate Potenial Means of Rebuilding Sturgeon Populations in the Snake River between Lower Granite and Hells Canyon Dams, 2002 Annual Report.  

SciTech Connect (OSTI)

The specific research goal of this project is to identify means to restore and rebuild the Snake River white sturgeon (Acipenser transmontanus) population to support a sustainable annual subsistence harvest equivalent to 5 kg/ha/yr (CBFWA 1997). Based on data collected, a white sturgeon adaptive management plan will be developed. This report presents a summary of results from the 1997-2002 Phase II data collection and represents the end of phase II. From 1997 to 2001 white sturgeon were captured, marked, and population data were collected in the Snake and Salmon. A total of 1,785 white sturgeon were captured and tagged in the Snake River and 77 in the Salmon River. Since 1997, 25.8 percent of the tagged white sturgeon have been recaptured. Relative density of white sturgeon was highest in the free-flowing segment of the Snake River, with reduced densities of fish in Lower Granite Reservoir, and low densities the Salmon River. Differences were detected in the length frequency distributions of white sturgeon in Lower Granite Reservoir, the free-flowing Snake River and the Salmon River (Chi-Square test, P<0.05). The proportion of white sturgeon greater than 92 cm (total length) in the free-flowing Snake River has shown an increase of 30 percent since the 1970's. Using the Jolly-Seber model, the abundance of white sturgeon <60 cm, between Lower Granite Dam and the mouth of the Salmon River, was estimated at 2,483 fish, with a 95% confidence interval of 1,208-7,477. Total annual mortality rate was estimated to be 0.14 (95% confidence interval of 0.12 to 0.17). A total of 35 white sturgeon were fitted with radio-tags during 1999-2002. The movement of these fish ranged from 53 km (33 miles) downstream to 77 km (48 miles) upstream; however, 38.8 percent of the detected movement was less than 0.8 km (0.5 mile). Both radio-tagged fish and recaptured white sturgeon in Lower Granite Reservoir appear to move more than fish in the free-flowing segment of the Snake River. No seasonal movement pattern was detected, and no movement pattern was detected for different size fish. Analysis of the length-weight relationship indicated that white sturgeon in Lower Granite Reservoir had a higher relative weight factor than white sturgeon in the free-flowing Snake River. The results suggest fish are currently growing faster than fish historically inhabiting the study area, as well as other Columbia River basin white sturgeon populations. Artificial substrate egg mats documented white sturgeon spawning in four consecutive years. A total of 49 white sturgeon eggs were recovered in the Snake River from 1999-2002, and seven from the Salmon River during 2000.

Everett, Scott R.; Tuell, Michael A.; Hesse, Jay A. (Nez Perce Tribe, Department of Fisheries Management, Lapwai, ID)

2004-02-01T23:59:59.000Z

153

Evaluate Potential Means of Rebuilding Sturgeon Populations in the Snake River between Lower Granite and Hells Canyon Dams, 1999 Annual Report.  

SciTech Connect (OSTI)

The specific research goal of this project is to identify means to restore and rebuild the Snake River white sturgeon (Acipenser transmontanus) population to support a sustainable annual subsistence harvest equivalent to 5 kg/ha/yr (CBFWA 1997). Based on data collected, a white sturgeon adaptive management plan will be developed. This 1999 annual report covers the third year of sampling of this multi-year study. In 1999 white sturgeon were captured, marked and population data were collected in the Snake and Salmon rivers. A total of 33,943 hours of setline effort and 2,112 hours of hook-and-line effort was employed in 1999. A total of 289 white sturgeon were captured and tagged in the Snake River and 29 in the Salmon River. Since 1997, 11.1 percent of the tagged white sturgeon have been recaptured. In the Snake River, white sturgeon ranged in total length from 27 cm to 261 cm and averaged 110 cm. In the Salmon River, white sturgeon ranged in total length from 98 cm to 244 cm and averaged 183.5 cm. Using the Jolly-Seber model, the abundance of white sturgeon < 60 cm, between Lower Granite Dam and the mouth of the Salmon River, was estimated at 1,823 fish, with a 95% confidence interval of 1,052-4,221. A total of 15 white sturgeon were fitted with radio-tags. The movement of these fish ranged from 6.4 km (4 miles) downstream to 13.7 km (8.5 miles) upstream; however, 83.6 percent of the detected movement was less than 0.8 kilometers (0.5 miles). Both radio-tagged fish and recaptured white sturgeon in Lower Granite Reservoir appear to move more than fish in the free-flowing segment of the Snake River. No seasonal movement pattern was detected, and no movement pattern was detected for different size fish. Differences were detected in the length frequency distributions of white sturgeon in Lower Granite Reservoir and the free-flowing Snake River (Chi-Square test, P < 0.05). The proportion of white sturgeon greater than 92 cm (total length) in the free-flowing Snake River has shown an increase of 29 percent since the 1970's. Analysis of the length-weight relationship indicated that white sturgeon in Lower Granite Reservoir were slightly larger than white sturgeon in the free-flowing Snake River. A von Bertalanffy growth curve was fitted to 49 aged white sturgeon. The results suggests the fish are currently growing faster than fish historicly inhabiting the study area, as well as other Columbia River basin white sturgeon populations. Artificial substrate mats were used to document white sturgeon spawning. Five white sturgeon eggs were recovered in the Snake River.

Tuell, Michael A.; Everett, Scott R. (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

2003-03-01T23:59:59.000Z

154

Evaluate Potential Means of Rebuilding Sturgeon Populations in the Snake River between Lower Granite and Hells Canyon Dams, 2001 Annual Report.  

SciTech Connect (OSTI)

The specific research goal of this project is to identify means to restore and rebuild the Snake River white sturgeon (Acipenser transmontanus) population to support a sustainable annual subsistence harvest equivalent to 5 kg/ha/yr (CBFWA 1997). Based on data collected, a white sturgeon adaptive management plan will be developed. This 2001 annual report covers the fifth year of sampling of this multi-year study. In 2001 white sturgeon were captured, marked, and population data were collected in the Snake and Salmon rivers. The Snake River was sampled between Lower Granite Dam (rkm 174) and the mouth of the Salmon River (rkm 303), and the Salmon River was sampled from its mouth upstream to Hammer Creek (rkm 84). A total of 45,907 hours of setline effort and 186 hours of hook-and-line effort was employed in 2001. A total of 390 white sturgeon were captured and tagged in the Snake River and 12 in the Salmon River. Since 1997, 36.1 percent of the tagged white sturgeon have been recaptured. In the Snake River, white sturgeon ranged in total length from 42 cm to 307 cm and averaged 107 cm. In the Salmon River, white sturgeon ranged in total length from 66 cm to 235 cm and averaged 160 cm. Using the Jolly-Seber model, the abundance of white sturgeon <60 cm, between Lower Granite Dam and the mouth of the Salmon River, was estimated at 2,483 fish, with a 95% confidence interval of 1,208-7,477. An additional 10 white sturgeon were fitted with radio-tags during 2001. The locations of 17 radio-tagged white sturgeon were monitored in 2001. The movement of these fish ranged from 38.6 km (24 miles) downstream to 54.7 km (34 miles) upstream; however, 62.6 percent of the detected movement was less than 0.8 km (0.5 mile). Both radio-tagged fish and recaptured white sturgeon in Lower Granite Reservoir appear to move more than fish in the free-flowing segment of the Snake River. No seasonal movement pattern was detected, and no movement pattern was detected for different size fish. Differences were detected in the length frequency distributions of white sturgeon in Lower Granite Reservoir and the free-flowing Snake River (Chi-Square test, P<0.05). The proportion of white sturgeon greater than 92 cm (total length) in the free-flowing Snake River has shown an increase of 30 percent since the 1970's. Analysis of the length-weight relationship indicated that white sturgeon in Lower Granite Reservoir had a higher relative weight factor than white sturgeon in the free-flowing Snake River. A von Bertalanffy growth curve was fitted to 309 aged white sturgeon. The results suggest fish are currently growing faster than fish historically inhabiting the study area, as well as other Columbia River basin white sturgeon populations. Artificial substrate mats were used to document white sturgeon spawning. A total of 14 white sturgeon eggs were recovered in the Snake River in 2001.

Everett, Scott R.; Tuell, Michael A. (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

2003-03-01T23:59:59.000Z

155

EIS-0379- Rebuild of the Libby (FEC) to Troy Section of BPA’s 115-kilovolt Transmission Line in Libby, Lincoln County, Montana  

Broader source: Energy.gov [DOE]

This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA’s Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative’s (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA’s Troy Substation just east of the town of Troy, Montana.

156

Hualapai Tribal Utility Development Project  

SciTech Connect (OSTI)

The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central power grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon West Power Project construction of the power infrastructure at Grand Canyon West. Develop the maintenance and operations capacity necessary to support utility operations. Develop rates for customers on the Grand Canyon West “mini-grid” sufficient for the tribal utility to be self-sustaining. Establish an implementation strategy for tribal utility service at Grand Canyon West Objective 2 - Develop a strategy for tribal utility takeover of electric service on the Reservation. Perform a cost analysis of Reservation electrical service. Develop an implementation strategy for tribal takeover of Reservation electrical service. Examine options and costs associated with integration of the Tribe’s wind resources.

Hualapai Tribal Nation

2008-05-25T23:59:59.000Z

157

EV Everywhere Grand Challenge: DOE's 10-Year Vision for Plug...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Plug-in Electric Vehicles & Batteries EV Everywhere Grand Challenge: DOE's 10-Year Vision for Plug-in Electric Vehicles EV Everywhere Grand Challenge: DOE's 10-Year Vision for...

158

The Lower Rio Grande Valley Regional Public Transportation Coordination Plan  

E-Print Network [OSTI]

KFH GROUP, INC. THE LOWER RIO GRANDE VALLEY REGIONAL PUBLIC TRANSPORTATION COORDINATION PLAN Developed for: Lower Rio Grande Valley Regional Transportation Coordination Plan Committee By: KFH Group, Incorporated... Page BACKGROUND..............................................................................................................................1 PLAN PROCESS...

Lower Rio Grande Valley Development Council

2006-11-30T23:59:59.000Z

159

Energy Secretary Steven Chu to Attend Grand Opening of Recovery...  

Office of Environmental Management (EM)

to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant...

160

Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operation and Maintenance Facilities, Annual Report 2003.  

SciTech Connect (OSTI)

Anadromous salmonid stocks have declined in both the Grande Ronde River Basin (Lower Snake River Compensation Plan (LSRCP) Status Review Symposium 1998) and in the entire Snake River Basin (Nehlsen et al. 1991), many to the point of extinction. The Grande Ronde River Basin historically supported large populations of fall and spring chinook (Oncorhynchus tshawytscha), sockeye (O. nerka), and coho (O. kisutch) salmon and steelhead trout (O. mykiss) (Nehlsen et al. 1991). The decline of chinook salmon and steelhead populations and extirpation of coho and sockeye salmon in the Grande Ronde River Basin was, in part, a result of construction and operation of hydroelectric facilities, over fishing, and loss and degradation of critical spawning and rearing habitat in the Columbia and Snake River basins (Nehlsen et al. 1991). Hatcheries were built in Oregon, Washington and Idaho under the Lower Snake River Compensation Plan (LSRCP) to compensate for losses of anadromous salmonids due to the construction and operation of the lower four Snake River dams. Lookingglass Hatchery (LGH) on Lookingglass Creek, a tributary of the Grande Ronde River, was completed under LSRCP in 1982 and has served as the main incubation and rearing site for chinook salmon programs for Grande Ronde and Imnaha rivers in Oregon. Despite these hatchery programs, natural spring chinook populations continued to decline resulting in the National Marine Fisheries Service (NMFS) listing Snake River spring/summer chinook salmon as ''threatened'' under the federal Endangered Species Act (1973) on 22 April 1992. Continuing poor escapement levels and declining population trends indicated that Grande Ronde River basin spring chinook salmon were in imminent danger of extinction. These continuing trends led fisheries co-managers in the basin to initiate the Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSSP) in order to prevent extinction and preserve options for use of endemic fish stocks in future artificial propagation programs. The GRESCSSP was implemented in three Grande Ronde River basin tributaries; the Lostine and upper Grande Ronde rivers and Catherine Creek. The GRESCSSP employs two broodstock strategies utilizing captive and conventional brood sources. The captive brood program began in 1995, with the collection of parr from the three tributary areas. The conventional broodstock component of the program began in 1997 with the collection of natural adults returning to these tributary areas. Although LGH was available as the primary production facility for spring chinook programs in the Grande Ronde Basin, there were never any adult or juvenile satellite facilities developed in the tributary areas that were to be supplemented. An essential part of the GRESCSSP was the construction of adult traps and juvenile acclimation facilities in these tributary areas. Weirs were installed in 1997 for the collection of adult broodstock for the conventional component of the program. Juvenile facilities were built in 2000 for acclimation of the smolts produced by the captive and conventional broodstock programs and as release sites within the natural production areas of their natal streams. The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) operate both the juvenile acclimation and adult trapping facilities located on Catherine Creek and the upper Grande Ronde River under this project. The Nez Perce Tribe (NPT) operate the facilities on the Lostine River under a sister project. Hatcheries were also built in Oregon, Washington and Idaho under the LSRCP to compensate for losses of summer steelhead due to the construction and operation of the lowest four Snake River dams. Despite these harvest-driven hatchery programs, natural summer steelhead populations continued to decline as evidenced by declining counts at Lower Granite Dam since 1995 (Columbia River Data Access in Real Time, DART) and low steelhead redd counts on index streams in the Grande Ronde Basin. Because of low escapement the Snake River summer steelhead were listed as threat

McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Urban Water Conservation along the Rio Grande  

E-Print Network [OSTI]

Urban Water Conservation along the Rio Grande THE TEXAS A&M UNIVERSITY SYSTEM NEW MEXICO STATE UNIVERSITY An Inventory of Water Conservation Programs TR 269 SP 201 Valeen Silvy, 1 Ronald Kaiser, 2 Bruce Lesikar 3 and Craig Runyan... water running into the streets from irrigation systems. Urban water conservation incorporates water- saving measures and incentives for the home, on the landscape and throughout the city water distribution system. It is easy to differentiate be...

Silvey, Valeen; Kaiser, Ronald; Lesikar, Bruce; Runyan, Craig

2004-01-01T23:59:59.000Z

162

Grand Gulf-prioritization of regulatory requirements  

SciTech Connect (OSTI)

As cost pressures mount, Grand Gulf nuclear station (GGNS) is relying increasingly on various prioritization approaches to implement, modify, eliminate, or defer regulatory requirements. Regulatory requirements can be prioritized through the use of three measures: (1) safety (or risk) significance; (2) cost; and (3) public policy (or political) significance. This paper summarizes GGNS' efforts to implement solutions to regulatory issues using these three prioritization schemes to preserve a balance between cost and safety benefit.

Meisner, M.J. (Entergy Operations Inc., Port Gibson, MS (United States))

1993-01-01T23:59:59.000Z

163

Greensburg, Kansas: Building a Model Green Community, How Would You Rebuild a Town - Green? April 2009 (Brochure)  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensional Subject: GuidanceNotGrandPurchasingGO-102009-2829 * April 2009

164

Re-Building Greensburg  

ScienceCinema (OSTI)

Greensburg, KS - A town that was devastated by a tornado in 2007, yet came back to be one of the Nation's most energy-efficient, sustainable communities. Civic leaders and entrepreneurs helped rally residents behind the idea of "greening" Greensburg, inspiring the construction of numerous energy-efficient buildings, some of which generate their own renewable power with solar panels and wind turbines. Many of the town's government buildings use cutting edge energy-saving technologies, saving the local taxpayers' money. Greensburg has demonstrated to the world that any city can reach its energy efficiency and renewable energy goals today using widely available technologies.

Hewitt, Steven; Wallach, Daniel; Peterson, Stephanie;

2013-05-29T23:59:59.000Z

165

Chehalis-Centralia Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed New Substation SitesStandingtheirCheck In & Registration Check In/16/2015

166

Palisades-Goshen Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 TheSteven Ashby Dr. Steven Para9EnvironmentalPage

167

Bandon-Rouge Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScience ProgramBackground High Energy PhysicsInnovation

168

Kalispell-Kerr Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfraredJeffersonJonathan Pershingrelocates 18-ton machineWednesday, July

169

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

170

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

171

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

172

About the sign ambiguity in the evaluation of Grand Canonical traces for quasi-particle statistical density operators  

E-Print Network [OSTI]

A simple and general prescription for evaluating unambiguously the sign of the grand-canonical trace of quasi-particle statistical density operators (the so-called sign ambiguity in taking the square root of determinants) is given. Sign ambiguities of this kind appear in the evaluation of the grand-canonical partition function projected to good quantum numbers (angular momentum, parity and particle number) in the Hartree-Fock-Bogoliubov approximation at finite temperature, since traces are usually expressed as the square root of determinants. A comparison is made with the numerical continuity method.

G. Puddu

2009-12-02T23:59:59.000Z

173

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

174

Grand Unification and Enhanced Quantum Gravitational Effects  

SciTech Connect (OSTI)

In grand unified theories with large numbers of fields, renormalization effects significantly modify the scale at which quantum gravity becomes strong. This in turn can modify the boundary conditions for coupling constant unification, if higher dimensional operators induced by gravity are taken into consideration. We show that the generic size of, and the uncertainty in, these effects from gravity can be larger than the two-loop corrections typically considered in renormalization group analyses of unification. In some cases, gravitational effects of modest size can render unification impossible.

Calmet, Xavier [Catholic University of Louvain, Center for Particle Physics and Phenomenology, 2, Chemin du Cyclotron, B-1348 Louvain-la-Neuve (Belgium); Hsu, Stephen D. H.; Reeb, David [Institute of Theoretical Science, University of Oregon, Eugene, Oregon 97403 (United States)

2008-10-24T23:59:59.000Z

175

Mountain View Grand | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's HeatMexico: EnergyMithun Jump to:Moe WindMontMoraineAbbey JumpWindAcres,Grand

176

Grand Electric Coop, Inc | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio: Energy ResourcesGordon, Alabama:5 ClimateCounty is a countyGrand

177

High performance computing and communications grand challenges program  

SciTech Connect (OSTI)

The so-called protein folding problem has numerous aspects, however it is principally concerned with the {ital de novo} prediction of three-dimensional (3D) structure from the protein primary amino acid sequence, and with the kinetics of the protein folding process. Our current project focuses on the 3D structure prediction problem which has proved to be an elusive goal of molecular biology and biochemistry. The number of local energy minima is exponential in the number of amino acids in the protein. All current methods of 3D structure prediction attempt to alleviate this problem by imposing various constraints that effectively limit the volume of conformational space which must be searched. Our Grand Challenge project consists of two elements: (1) a hierarchical methodology for 3D protein structure prediction; and (2) development of a parallel computing environment, the Protein Folding Workbench, for carrying out a variety of protein structure prediction/modeling computations. During the first three years of this project, we are focusing on the use of two proteins selected from the Brookhaven Protein Data Base (PDB) of known structure to provide validation of our prediction algorithms and their software implementation, both serial and parallel. Both proteins, protein L from {ital peptostreptococcus magnus}, and {ital streptococcal} protein G, are known to bind to IgG, and both have an {alpha} {plus} {beta} sandwich conformation. Although both proteins bind to IgG, they do so at different sites on the immunoglobin and it is of considerable biological interest to understand structurally why this is so. 12 refs., 1 fig.

Solomon, J.E.; Barr, A.; Chandy, K.M.; Goddard, W.A., III; Kesselman, C.

1994-10-01T23:59:59.000Z

178

Citrus Production in the Lower Rio Grande Valley of Texas.  

E-Print Network [OSTI]

LIE?ARY, A t r: COLLEGE, CAvrus. TEXAS AGRICULTURAL EXPERIMENT STATION A. B. CONNER, DIRECTOR COLLEGE STATION, BRAZOS COUNTY, TEXAS - BULLETIN NO. 419 DIVISION OF HORTICULTURE Citrus Production in the Lower Rio Grande Valley of Texas... of Agriculture. . Citrus fruit production in the Lower Rio Grande Valley, especially grapefruit, has increased at a rather rapid rate dur- ing the past few years. More than 5,000,000 citrus trees were set in orchard form in the Lower Rio Grande Valley up...

Traub, Hamilton Paul; Friend, W. H. (William Heartsill)

1930-01-01T23:59:59.000Z

179

A Grand Challenge for Planetary Nebulae  

E-Print Network [OSTI]

The study of PN has been confronting a growing list of dilemmas which have yet to find coherent resolution. These issues are both observational and theoretical and can be stated as a series of "facts" which can not, as of yet, be accounted for via a single framework. We review these facts and propose a skeleton framework for developing a new understanding post-AGB stars, PPN and PN. Our framework represents an attempt to articulate a a global perspective on the late stages of stellar evolution that can embrace both the nature of the central engine and the outflows they produce. Our framework focuses on interacting binary central stars which drive collimated outflows through MHD processes. We propose that the field of AGB/PN studies now faces a "Grand Challenge" in articulating the observational systematics of these objects in a way that can address issues related to binarity and magnetic shaping. A theoretical Grand Challenge is also faced in the form of integrated studies which can explicate the highly non-linear processes associated with MHD outflows driven by interacting binaries. These issues include the generation of magnetic fields via dynamo processes, the creation of accretion disks, the dynamics of Common Envelope ejection and the creation of magnetized jets.

Adam Frank; Orsola De Marco; Eric Blackman; Bruce Balick

2007-12-12T23:59:59.000Z

180

Grand Challenge for Basic and Applied Research in Hydrogen Storage...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Storage Grand Challenge for Basic and Applied Research in Hydrogen Storage Presentation from the Hydrogen Storage Pre-Solicitation Meeting held June 19, 2003 in Washington, DC....

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

,"Grand Island, NY Natural Gas Pipeline Imports From Canada ...  

U.S. Energy Information Administration (EIA) Indexed Site

Imports From Canada (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","Grand Island,...

182

Data Acquisition-Manipulation At Rio Grande Rift Region (Morgan...  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Rio Grande Rift Region (Morgan, Et Al., 2010) Exploration...

183

EV Everywhere Grand Challenge Introduction for Electric Drive...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

at the EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop on July 24, 2012 held at the Doubletree O'Hare, Chicago, IL....

184

EV Everywhere Grand Challenge - Electric Drive (Power Electronics...  

Broader source: Energy.gov (indexed) [DOE]

- Electric Drive (Power Electronics and Electric Machines) Workshop EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop List of...

185

SunShot Grand Challenge Summit Breakout Sessions Announced |...  

Broader source: Energy.gov (indexed) [DOE]

leaders and subject matter experts across 17 breakout sessions will provide insights and perspectives on the "grand challenges" to meeting the SunShot 2020 affordability goal in...

186

City of Grand Rapids- Green Building Requirements for Municipal Buildings  

Broader source: Energy.gov [DOE]

In January 2006, the City of Grand Rapids approved a resolution detailing the city's sustainability policy for public buildings. The resolution directed city personnel to implement the principles...

187

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

188

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

189

Project Year Project Team  

E-Print Network [OSTI]

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

190

Analysis of the experience and stability project at Ford Motor Company : what does it take to change a culture and rebuild a technical organization?  

E-Print Network [OSTI]

As Ford Motor Company celebrates its 100th anniversary; it finds itself in a crisis due to its lack of technical proficiency. The lack of technical depth within the workforce is the result of a deeply ingrained culture ...

Chatawanich, Candy Suda, 1972-

2004-01-01T23:59:59.000Z

191

Advanced Resin Cleaning System (ARCS) at Grand Gulf Nuclear Station  

SciTech Connect (OSTI)

Steam generation system in-core components can undergo serious material degradation by a variety of corrosion-related phenomena. These phenomena are largely controlled by boiler water (i.e. reactor water) chemistry which is strongly impacted by the performance of the condensate system mixed bed ion exchange units. In Boiling Water Reactors (BWR), the mixed bed ion exchange units not only provide protection from ionic contaminants, but also remove insoluble corrosion products by filtration/adsorption. These insoluble corrosion products removed by the ion exchange units must then be periodically cleaned from the resin bed by some process external to the BWR primary water loop. A unique resin cleaning process called the {open_quotes}Advanced Resin Cleaning System{close_quotes} (ARCS) was developed in the late 1980`s by members of CENTEC-XXI, located in Santa Clara, CA. This system, which has been successfully operated for several years at a Pressurized Water Reactor is highly efficient for removal of both insoluble corrosion products and anion/cation resin fines, and generates significantly less waste water than other cleaning methods. The ARCS was considered the most attractive method for meeting the demanding and costly resin cleaning needs of a BWR. A {open_quotes}Tailored Collaboration{close_quotes} project was initiated between EPRI, Entergy Operations (Grand Gulf Station), and CENTEC-XXI to demonstrate the {open_quotes}Advanced Resin Cleaning System{close_quotes} in a BWR.

Asay, R.H.; Earls, J.E.; Naughton, M.D. [Centec 21, Inc., Santa Clara, CA (United States)

1996-10-01T23:59:59.000Z

192

Recent Results from Kascade-Grande  

E-Print Network [OSTI]

KASCADE-Grande is a new extensive air shower experiment co-located to the KASCADE site at Forschungszentrum Karlsruhe. The multi-detector system allows to investigate the energy spectrum, composition, and anisotropies of cosmic rays with unprecedented prevision in the energy range from 10^{14}-10^{18} eV. The primary goals besides investigating the origin of the knee at E ~ 3 * 10^{15} eV, are to verify the existence of the second knee at E ~ 10^{17} eV and to measure the composition in the expected transition region of galactic to extragalactic cosmic rays. The performance of the apparatus and shower reconstruction methods will be discussed on the basis of detailed Monte Carlo simulations and first data. First results based on slightly more than a year of data taking are presented.

Kampert, K H; Ainsley, C; Åkesson, P F; Alexander, G; Anagnostou, G; Anderson, K J; Asai, S; Axen, D; Bailey, I; Barberio, E; Barillari, T; Barlow, R J; Batley, J Richard; Bechtle, P; Behnke, T; Bell, K W; Bell, P J; Bella, G; Bellerive, A; Benelli, G; Bethke, Siegfried; Biebel, O; Boeriu, O; Bock, P; Boutemeur, M; Braibant, S; Brown, R M; Burckhart, H J; Campana, S; Capiluppi, P; Carnegie, R K; Carter, A A; Carter, J R; Chang, C Y; Charlton, D G; Ciocca, C; Csilling, A; Cuani, M; Dado, S; de Roeck, A; De Wolf, E A; Desch, K; Dienes, B; Dubbert, J; Duchovni, E; Duckeck, G; Duerdoth, I P; Etzion, E; Fabbri, F; Ferrari, P; Fiedler, F; Fleck, I; Ford, M; Frey, A; Gagnon, P; Gary, J W; Geich-Gimbel, C; Giacomelli, G; Giacomelli, P; Giunta, M; Goldberg, J; Gross, E; Grunhaus, J; Gruwé, M; Sen-Gupta, A; Hajdu, C; Hamann, M; Hanson, G G; Harel, A; Hauschild, M; Hawkes, C M; Hawkings, R; Herten, G; Heuer, R D; Hill, J C; Horváth, D; Igo-Kemenes, P; Ishii, K; Jeremie, H; Jovanovic, P; Junk, T R; Kanzaki, J; Karlen, D; Kawagoe, K; Kawamoto, T; Keeler, R K; Kellogg, R G; Kennedy, B W; Kluth, S; Kobayashi, T; Kobel, M; Komamiya, S; Kramer, T; Krasznahorkay, A; Krieger, P; Von Krogh, J; Kühl, T; Kupper, M; Laerty, G D; Landsman, H; Lanske, D; Lellouch, D; Letts, J; Levinson, L; Lillich, J; Lloyd, S L; Loebinger, F K; Lü, J; Ludwig, A; Ludwig, J; Mader, W; Marcellini, S; Martin, A J; Mashimo, T; Mättig, P; McKenna, J; McPherson, R A; Meijers, F; Menges, W; Merritt, F S; Mes, H; Meyer, N; Michelini, A; Mihara, S; Mikenberg, G; Miller, D J; Mohr, W; Mori, T; Mutter, A; Nagai, K; Nakamura, I; Nanjo, H; Neal, H A; Nisius, R; O'Neale, S W; Oh, A; Oreglia, M J; Orito, S; Pahl, C; Pásztor, G; Pater, J R; Pilcher, J E; Pinfold, J L; Plane, D E; Pooth, O; Przybycien, M B; Quadt, A; Rabbertz, K; Rembser, C; Renkel, P; Roney, J M; Rossi, A M; Rozen, Y; Runge, K; Sachs, K; Saeki, T; Sarkisyan-Grinbaum, E; Schaile, A D; Schaile, O; Schar-Hansen, P; Schieck, J; Schörner-Sadenius, T; Schröder, M; Schumacher, M; Seuster, R; Shears, T G; Shen, B C; Sherwood, P; Skuja, A; Smith, A M; Sobie, R J; Söldner-Rembold, S; Spanó, F; Stahl, A; Strom, D; Ströhmer, R; Tarem, S; Tasevsky, M; Teuscher, R; Thomson, M A; Torrence, E; Toya, D; Tran, P; Trigger, I; Trócsányi, Z L; Tsur, E; Turner-Watson, M F; Ueda, I; Ujvári, B; Vollmer, C F; Vannerem, P; Vertesi, R; Verzocchi, M; Voss, H; Vossebeld, Joost Herman; Ward, C P; Ward, D R; Watkins, P M; Watson, A T; Watson, N K; Wells, P S; Wengler, T; Wermes, N; Wilson, G W; Wilson, J A; Wolf, G; Wyatt, T R; Yamashita, S; Zer-Zion, D; Zivkovic, L; Kampert, Karl-Heinz

2006-01-01T23:59:59.000Z

193

Grand Challenge: Scalable Stateful Stream Processing for Smart Grids  

E-Print Network [OSTI]

to the ACM DEBS Grand Challenge 2014, which evaluates event-based systems for smart grid analytics. OurGrand Challenge: Scalable Stateful Stream Processing for Smart Grids Raul Castro Fernandez for event queries. The 2014 edition of the challenge [15] focuses on smart grid analytics and is based

Pietzuch, Peter

194

Integrated Water Management for Environmental Flows in the Rio Grande  

E-Print Network [OSTI]

flows; Reservoir reoperation; Integrated water management; Adaptive management; Rio Grande. IntroductionIntegrated Water Management for Environmental Flows in the Rio Grande S. Sandoval-Solis, A.M.ASCE1 the environment. This paper presents an integrated water management approach to meet current and future water

Pasternack, Gregory B.

195

Technical basis for radiological release of Grand Junction Office Building 2. Volume 2, dose assessment supporting data  

SciTech Connect (OSTI)

The second volume of the Grand Junction Office Action Program Technical Basis for Radiological Release of Grand Junction Office Building 2 report includes the data quality objectives (DQO), sampling plan, collected data, and analysis used to model future radiation doses to members of the public occupying Building 2 on the U.S. Department of Energy (DOE) Grand Junction Office (GJO) site. This volume was assembled by extracting relevant components of the Grand Junction Projects Office Remedial Action Project Building 2 Public Dose Evaluation (DOE 1996) and inserting recent additional data that was gathered and dose pathway modeling that was performed. The intent of this document is to provide all derived guidance decisions, assumptions, measured data, testing results, and pathway modeling software input and output data that supports the discussion and determinations presented in Volume 1 of this report. For constructive employment of this document, the reader is encouraged to closely follow Volume 1 for proper association with the segment of information being examined.

NONE

1997-07-01T23:59:59.000Z

196

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

197

Project Proposal Project Logistics  

E-Print Network [OSTI]

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

198

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

199

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

200

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Final report of the radiological release survey of Building 11 at the Grand Junction Office Facility  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 11 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

Johnson, R.K.; Corle, S.G.

1997-09-01T23:59:59.000Z

202

Final report of the radiological release survey of Building 19 at the Grand Junction Office Facility  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 19 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

Johnson, R.K.; Corle, S.G.

1997-09-01T23:59:59.000Z

203

Final report of the radiological release survey of Building 54 at the Grand Junction Office Facility  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 54 and the underlying soil were found not to be radiologically contaminated, and can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual release report for each GJO building.

Johnson, R.K.; Corle, S.G.

1997-09-01T23:59:59.000Z

204

Final report of the radiological release survey of Building 29 at the Grand Junction Office Facility  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailing during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 29 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

Johnson, R.K.; Corle, S.G.

1997-09-01T23:59:59.000Z

205

Toward Net Energy Buildings: Design, Construction, and Performance of the Grand Canyon House  

SciTech Connect (OSTI)

The Grand Canyon house is a joint project of the DOE's National Renewable Energy Laboratory and the U.S. National Park Service and is part of the International Energy Agency Solar Heating and Cooling Programme Task 13 (Advanced Solar Low-Energy Buildings). Energy consumption of the house, designed using a whole-building low-energy approach, was reduced by 75% compared to an equivalent house built in accordance with American Building Officials Model Energy Code and the Home Energy Rating System criteria.

C. Edward Hancock; Greg Barker; J. Douglas Balcomb.

1999-06-23T23:59:59.000Z

206

Idaho National Laboratory Ten-Year Site Plan Project Description Document  

SciTech Connect (OSTI)

This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL opereational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

Not Listed

2012-03-01T23:59:59.000Z

207

Colorado Natural Heritage Program 2003 Project Abstracts  

E-Print Network [OSTI]

Colorado Natural Heritage Program 2003 Project Abstracts #12;Cover photo: A CNHP researcher collects freshwater specimens (Pisidium spp.) at Long Slough Reservoir on the Grand Mesa of Colorado's West of Colorado's biodiversity, what efforts are underway to maintain it, and why more biological information

208

Methane generation at Grand Gulf Nuclear Station  

SciTech Connect (OSTI)

The methane generation at Grand Gulf has been brought to light twice. The initial event occurred in February 1990 and the second in December 1993. Both events involved the receipt of a cask at Barnwell Waste Management Facility that when opened indicated a gas escaping. The gas was subsequently sampled and indicated a percentage of explosive gas. Both events involved powdered resin and indicated that the generation was from a bacterial attack of the organic materials (cellulose in the powdered resin mixture). The first event occurred and was believed to be isolated in a particular waste stream. The situation was handled and a biocide was found to be effective in treatment of liners until severe cross contamination of another waste stream occurred. This allowed the shipment of a liner that was required to be sampled for explosive gases. The biocide used by GGNS was allowed reintroduction into the floor drains and this allowed the buildup of immunity of the bacterial population to this particular biocide. The approval of a new biocide has currently allowed GGNS to treat liners and ship them offsite.

Carver, M.L. [Entergy Operations, Inc., Grand Gulf Nuclear Station, Port Gibson, MS (United States)

1995-09-01T23:59:59.000Z

209

Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2000 Annual Report.  

SciTech Connect (OSTI)

The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, commonly known as the Joint Stock Assessment Project (JSAP) is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (blocked area). The three-phase approach of this project will enhance the fisheries resources of the blocked area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information housed in a central location will allow managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP (NWPPC program measure 10.8B.26) is designed and guided jointly by fisheries managers in the blocked area and the Columbia Basin blocked area management plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of blocked area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the blocked area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. The use of common collection and analytical tools is essential to the process of streamlining joint management decisions. In 1999 and 2000 the project began to address some of the identified data gaps, throughout the blocked area, with a variety of newly developed sampling projects, as well as, continuing with ongoing data collection of established projects.

Crossley, Brian (Spokane Tribe of Indians, Department of Natural Resources, Wellpinit, WA); Lockwood, Jr., Neil W. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA)

2001-01-01T23:59:59.000Z

210

Grand Opening of Abengoa's Biorefinery: Nation's Third Commercial...  

Office of Environmental Management (EM)

its grand opening on October 17, 2014, in Hugoton, Kansas. The Abengoa Bioenergy Biomass of Kansas (ABBK) facility is the first of its kind to use a proprietary enzymatic...

211

SunShot Grand Challenge Summit | Department of Energy  

Office of Environmental Management (EM)

features a four-day agenda packed with opportunities to shape the future of the U.S. solar industry. Read more Why Attend? Building on the success of the first Grand Challenge...

212

Cambridge Grand Junction transit implementation : alternatives, scheduling, cost, and performance  

E-Print Network [OSTI]

The Grand Junction railroad lies at the heart of East Cambridge adjacent to the Kendall Square business district and the Massachusetts Institute of Technology campus. Over the last one hundred years the railroad has gone ...

Iglesias Cuervo, Jesus

2012-01-01T23:59:59.000Z

213

DEPARTMENT OF UROLOGIC SCIENCES GRAND ROUNDS FOR 2014-2015  

E-Print Network [OSTI]

Tempany-Afdhal, Professor of Radiology, Harvard Medical School #12;DEPARTMENT OF UROLOGIC SCIENCES GRAND Resident PGY-4 April 1 Urology Faculty, Dr. Joel Teichman 8 Dr. Phyllis Kisa, Pediatric Surgery Fellow 15

Ollivier-Gooch, Carl

214

SunShot Grand Challenge Highlights Ambitious Efforts along the...  

Office of Environmental Management (EM)

Solar Spectrum SunShot Grand Challenge Highlights Ambitious Efforts along the Entire Solar Spectrum June 13, 2012 - 5:30pm Addthis Energy Secretary Steven Chu gives the...

215

Geothermal Resources of Rifts- a Comparison of the Rio Grande...  

Open Energy Info (EERE)

navigation, search OpenEI Reference LibraryAdd to library Journal Article: Geothermal Resources of Rifts- a Comparison of the Rio Grande Rift and the Salton Trough Abstract The Rio...

216

City of Grand Rapids- Green Power Purchasing Policy  

Broader source: Energy.gov [DOE]

In 2005, the City of Grand Rapids established a goal of purchasing 20% of its municipal power demand from renewable energy by 2008. In November 2007, the city signed a three-year agreement with a...

217

Sandia National Laboratories: Upper Rio Grande Simulation Model...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Energy-Water Planning Upper Rio Grande Simulation Model (URGSiM) Contact Jesse Roach jdroach@sandia.gov (505) 284-9367 Last Updated: April 23, 2012 Go To Top ...

218

agudos grandes granite: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for the Rio GrandeBasin, one of the most productive agriculturalareas in the United States. Irrigated agricul- ture claims 85 percent of its water, and urban water use is...

219

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

Gray, Jeffrey J.

220

Lessons Learned: The Grand Junction Office Site Transfer to Private Ownership  

SciTech Connect (OSTI)

The U.S. Department of Energy Grand Junction Office (DOE?GJO) in Grand Junction, Colorado, has played an integral role within the DOE complex for many years. GJO has a reputation for outstanding quality in the performance of complex environmental restoration projects, utilizing state-of-the-art technology. Many of the GJO missions have been completed in recent years. In 1998, DOE Headquarters directed GJO to reduce its mortgage costs by transferring ownership of the site and to lease space at a reasonable rate for its ongoing work. A local community group and GJO have entered into a sales contract; signing of the Quitclaim Deed is planned for February 16, 2001. Site transfer tasks were organized as a project with a critical-path schedule to track activities and a Site Transition Decision Plan was prepared that included a decision process flow chart, key tasks, and responsibilities. Specifically, GJO identified the end state with affected parties early on, successfully dealt with site contamination issues, and negotiated a lease-back arrangement, resulting in an estimated savings of more than 60 percent of facility maintenance costs annually. Lessons learned regarding these transition activities could be beneficial to many other sites.

none,

2001-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

EA-1338: Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership, Grand Junction, Colorado  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts for the proposed transfer of real and personal property at the U.S. Department of Energy's Grand Junction Office to non-DOE ownership.

222

Project Accounts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions...

223

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: Construction Project Team: Project Facts & Figures: Budget: £500,000 Funding Source: Capital Construction Project Programme: Start on Site: October 2010 End Date : April 2011 Occupation Date: n/a For further information contact Project Manager as listed above or the Imperial College

224

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors on the Faculty of Medicine, please visit: http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £3,500,000 Funding Source: SRIF III Construction Project Programme: Start

225

Tomato Varieties and Fertilizers for the Lower Rio Grand Valley.  

E-Print Network [OSTI]

, 1931. **In roopc.ration with U. S. Drpartmcnt of Agriculture. Tomato production is one of the leading truck-gardening enterprises in the Lower Rio Grande VaIley. The annual pro- duction of tomatoes has increased from 946 cars in 1926-27 to 2..., 1931 TOMATO VARIETIES AND FERTILIZERS FOR THE LOWER RIO GRANDE VALLEY W. H. FRIEND The production of tomatoes during the late spring and early summer is one of the most important trucking enterprises of the irrigated por- tions of the counties...

Friend, W. H. (William Heartsill)

1931-01-01T23:59:59.000Z

226

Long-term surveillance plan for the Cheney disposal site near Grand Junction, Colorado  

SciTech Connect (OSTI)

This long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney disposal site. The site is in Mesa County near Grand Junction, Colorado. The U.S. Nuclear Regulatory Commission (NRC) has developed regulations for the issuance of a general license for the custody and long-term care of UMTRA Project disposal sites in 10 CFR Part 40. The purpose of this general license is to ensure that the UMTRA Project disposal sites are cared for in a manner that protects public health and safety and the environment. Before each disposal site may be licensed, the NRC requires the DOE to submit a site-specific LTSP. The DOE prepared this LTSP to meet this requirement for the Cheney disposal site. The general license becomes effective when the NRC concurs with the DOE`s determination that remedial action is complete and the NRC formally accepts this plan. This document describes the long-term surveillance program the DOE will implement to ensure that the Cheney disposal site performs as designed. The program is based on site inspections to identify potential threats to disposal cell integrity. The LTSP is based on the UMTRA Project long-term surveillance program guidance and meets the requirements of 10 CFR {section}40.27(b) and 40 CFR {section}192.03.

NONE

1997-04-01T23:59:59.000Z

227

Project Management Project Managment  

E-Print Network [OSTI]

­ Inspired by agile methods #12;Background · Large-scale software development & IT projects, plagued relations #12;One Agile Approach to Scheduling · The creative nature of game development resist heavy up Problems ­incompatible platforms, 3rd party etc. #12;Is Games Development Similar? · Yes & No

Stephenson, Ben

228

Project Year Project Team  

E-Print Network [OSTI]

An Engineer's Guide to the Structures of Baltimore Audience Students from the Krieger School of Arts City, interfaced through a course website, the team will integrate descriptions of structural behavior format. Technologies Used HTML/Web Design, MySQL Project Abstract Structural analysis is typically taught

Gray, Jeffrey J.

229

Network discovery, characterization, and prediction : a grand challenge LDRD final report.  

SciTech Connect (OSTI)

This report is the final summation of Sandia's Grand Challenge LDRD project No.119351, 'Network Discovery, Characterization and Prediction' (the 'NGC') which ran from FY08 to FY10. The aim of the NGC, in a nutshell, was to research, develop, and evaluate relevant analysis capabilities that address adversarial networks. Unlike some Grand Challenge efforts, that ambition created cultural subgoals, as well as technical and programmatic ones, as the insistence on 'relevancy' required that the Sandia informatics research communities and the analyst user communities come to appreciate each others needs and capabilities in a very deep and concrete way. The NGC generated a number of technical, programmatic, and cultural advances, detailed in this report. There were new algorithmic insights and research that resulted in fifty-three refereed publications and presentations; this report concludes with an abstract-annotated bibliography pointing to them all. The NGC generated three substantial prototypes that not only achieved their intended goals of testing our algorithmic integration, but which also served as vehicles for customer education and program development. The NGC, as intended, has catalyzed future work in this domain; by the end it had already brought in, in new funding, as much funding as had been invested in it. Finally, the NGC knit together previously disparate research staff and user expertise in a fashion that not only addressed our immediate research goals, but which promises to have created an enduring cultural legacy of mutual understanding, in service of Sandia's national security responsibilities in cybersecurity and counter proliferation.

Kegelmeyer, W. Philip, Jr.

2010-11-01T23:59:59.000Z

230

Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2002 Annual Report.  

SciTech Connect (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. In 1999, 2000, and 2001 the project began addressing some of the identified data gaps throughout the Blocked Area. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispel Department of Natural Resources, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA); Butler, Chris (Spokane Tribe of Indians, Department of Natural Resources, Wellpinit, WA)

2003-09-01T23:59:59.000Z

231

Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2002-2003 Annual Report.  

SciTech Connect (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial and native fish assemblages in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. The project began addressing identified data gaps throughout the Blocked Area in 1999. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, Spokane River below Spokane Falls, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002 and 2003. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife); Butler, Chris (Spokane Tribe of Indians, Wellpinit, WA)

2006-02-01T23:59:59.000Z

232

Resident Fish Stock above Chief Joseph and Grand Coulee Dams; 2003-2004 Annual Report.  

SciTech Connect (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power and Conservation Council (NPCC), formerly the Northwest Power Planning Council. The NPCC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPCC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial and native fish assemblages in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area. The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. The project began addressing identified data gaps throughout the Blocked Area in 1999. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of streams and lakes on the Spokane Indian Reservation were completed by 2001. Assessments of the Little Spokane River and its tributaries, Spokane River below Spokane Falls, tributaries to the Pend Oreille River, small lakes in Pend Oreille County, WA, and water bodies within and near the Spokane Indian Reservation were conducted in 2002 and 2003. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispel Tribe of Indians, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Olympia, WA); Butler, Chris (Spokane Tribe of Indians, Wellpinit, WA)

2005-11-01T23:59:59.000Z

233

Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams; 2001 Annual Report.  

SciTech Connect (OSTI)

In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power Planning Council (NPPC). The NPPC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPPC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adopted by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area and the Columbia Basin Blocked Area Management Plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. In 1999, 2000, and 2001 the project began addressing some of the identified data gaps throughout the Blocked Area. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of seven streams and four lakes on the Spokane Indian Reservation were completed by 2000. Assessments of the Little Spokane River and its tributaries, tributaries to the Pend Oreille River, small lakes in southern Pend Oreille County, and water bodies within and near the Spokane Indian Reservation were conducted in 2001. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).

Connor, Jason M. (Kalispell Department of Natural Resources, Usk, WA); McLellan, Jason G. (Washington Department of Fish and Wildlife, Spokane, WA); O'Connor, Dick (Washington Department of Fish and Wildlife, Olympia, WA)

2003-01-01T23:59:59.000Z

234

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

235

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

236

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: In the first phase of the Union Building re.union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: £1,400,000 Funding Source: Capital Plan and Imperial College Union reserves Construction Project Programme: Start on Site: August 2006 End Date: March

237

WATER COMMODIFICATION IN THE LOWER RIO GRANDE VALLEY, TEXAS  

E-Print Network [OSTI]

The lower Rio Grande Valley of Texas is one of the poorest regions with the largest population lacking suitable water supply in the entire United States. The region is characterized by low-income, rural and peri-urban communities called ?colonias...

Hernandez, Manuel

2011-05-06T23:59:59.000Z

238

WATER COMMODIFICATION IN THE LOWER RIO GRANDE VALLEY, TEXAS  

E-Print Network [OSTI]

The lower Rio Grande Valley of Texas is one of the poorest regions with the largest population lacking suitable water supply in the entire United States. The region is characterized by low-income, rural and peri-urban communities called colonias...

Garcia, Bianca 1989-

2011-05-06T23:59:59.000Z

239

SEDIMENT FLUX THROUGH THE RIO GRANDE RIVER: A MONSOONAL EFFECT  

E-Print Network [OSTI]

SEDIMENT FLUX THROUGH THE RIO GRANDE RIVER: A MONSOONAL EFFECT Troy C.Hiatt A thesis submitted University August 2010 Copyright © 2010 Troy C. Hiatt All Rights Reserved #12;ABSTRACT Sediment Flux through Climate has historically been recognized as an influence on sediment flux and deposition. The North

Seamons, Kent E.

240

Workshop and conference on Grand Challenges applications and software technology  

SciTech Connect (OSTI)

On May 4--7, 1993, nine federal agencies sponsored a four-day meeting on Grand Challenge applications and software technology. The objective was to bring High-Performance Computing and Communications (HPCC) Grand Challenge applications research groups supported under the federal HPCC program together with HPCC software technologists to: discuss multidisciplinary computational science research issues and approaches, identify major technology challenges facing users and providers, and refine software technology requirements for Grand Challenge applications research. The first day and a half focused on applications. Presentations were given by speakers from universities, national laboratories, and government agencies actively involved in Grand Challenge research. Five areas of research were covered: environmental and earth sciences; computational physics; computational biology, chemistry, and materials sciences; computational fluid and plasma dynamics; and applications of artificial intelligence. The next day and a half was spent in working groups in which the applications researchers were joined by software technologists. Nine breakout sessions took place: I/0, Data, and File Systems; Parallel Programming Paradigms; Performance Characterization and Evaluation of Massively Parallel Processing Applications; Program Development Tools; Building Multidisciplinary Applications; Algorithm and Libraries I; Algorithms and Libraries II; Graphics and Visualization; and National HPCC Infrastructure.

Not Available

1993-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Data Mining: Data Analysis on a Grand Scale? Padhraic Smyth  

E-Print Network [OSTI]

Data Mining: Data Analysis on a Grand Scale? Padhraic Smyth Information and Computer Science for Statistical Methods in Medical Research, September 2000 1 #12;Abstract Modern data mininghas evolvedlargelyas aresult ofe orts bycomputer scientists to address the needs of data owners" in extracting useful

Smyth, Padhraic

242

Creativity Support Tools: A Grand Challenge for HCI Researchers  

E-Print Network [OSTI]

the innovations from engineering, software development, and user interface design. Finally, creativity manifestsCreativity Support Tools: A Grand Challenge for HCI Researchers Ben Shneiderman Department can play a key role in design- ing, implementing, and evaluating a new generation of creativity

Shneiderman, Ben

243

The Stephen and Nancy GrandThe Stephen and Nancy GrandThe Stephen and Nancy GrandThe Stephen and Nancy Grand Water ResearchWater ResearchWater ResearchWater Research  

E-Print Network [OSTI]

Climate Change with Focus over the Mediterranean 9:55-10:20 Jan W. Hopmans, University of California: Global Climate Change, Environmental Risks and Water Scarcity #12;2 Monday, March 2Monday, March 2Monday, Director of the Stephen and Nancy Grand Water Research Institute, Technion Session 1 Global Climate Change

244

Citrus Variety Trends in the Lower Rio Grande Valley.  

E-Print Network [OSTI]

Citrus Variety Trends in the Lower Rio Grande Valley CONTENTS ......................................................................................................... Digest ...... 3... thousands of citrus trees and the growers were faced with a tremendous replanting program, which, in turn, had focused interest on varieties. Fruit production figures, yields per acre, and monetary returns per acre for five varieties of grapefruit...

Alderman, D. C. (DeForest Charles)

1951-01-01T23:59:59.000Z

245

Ouverture des portes : Plonge dans le Grand Bleu... Activits libres  

E-Print Network [OSTI]

Ouverture des portes : Plongée dans le Grand Bleu... Activités libres : · Présentations de nos ... Fermeture des portes 10h En Continu 17h 10h - 12h 14h - 15h 17h 15h - 17h Samedi 10 mai 2014 Portes ouvertes

246

Volume Project  

E-Print Network [OSTI]

Math 13900. Volume Project. For the following project, you may use any materials. This must be your own original creation. Construct a right pyramid with a base ...

rroames

2010-01-12T23:59:59.000Z

247

EIS-0355: Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah  

Broader source: Energy.gov [DOE]

The Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Environmental Impact Statement and associated supplements and amendments provides information on the environmental impacts of the U.S. Department of Energy’s (DOE’s) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project (DOE/EIS-0198, October 1996). The surface remediation alternatives analyzed in the EIS include on-site disposal of the contaminated materials and off-site disposal at one of three alternative locations in Utah using one or more transportation options: truck, rail, or slurry pipeline.

248

2008 Wind Energy Projects, Wind Powering America (Poster)  

SciTech Connect (OSTI)

The Wind Powering America program produces a poster at the end of every calendar year that depicts new U.S. wind energy projects. The 2008 poster includes the following projects: Stetson Wind Farm in Maine; Dutch Hill Wind Farm in New York; Grand Ridge Wind Energy Center in Illinois; Hooper Bay, Alaska; Forestburg, South Dakota; Elbow Creek Wind Project in Texas; Glacier Wind Farm in Montana; Wray, Colorado; Smoky Hills Wind Farm in Kansas; Forbes Park Wind Project in Massachusetts; Spanish Fork, Utah; Goodland Wind Farm in Indiana; and the Tatanka Wind Energy Project on the border of North Dakota and South Dakota.

Not Available

2009-01-01T23:59:59.000Z

249

Solar Community Comes Out in Full Force for SunShot Grand Challenge...  

Office of Environmental Management (EM)

Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit May 22, 2014 - 9:58am Addthis...

250

Estimating commuter rail demand to Kendall Square along the Grand Junction Corridor  

E-Print Network [OSTI]

Since acquiring the Grand Junction Railroad in June 2010 from CSX, the Massachusetts Bay Transit Authority (MBTA) has explored the possibility of using the line for commuter rail service. In addition the Grand Junction ...

Bockelie, Adam

2012-01-01T23:59:59.000Z

251

Save the Date: 2014 SunShot Grand Challenge Summit, May 19-22...  

Broader source: Energy.gov (indexed) [DOE]

Save the Date: 2014 SunShot Grand Challenge Summit, May 19-22, Anaheim, CA Save the Date: 2014 SunShot Grand Challenge Summit, May 19-22, Anaheim, CA January 9, 2014 - 10:02am...

252

Final report of the radiological release survey of Building 30B at the Grand Junction Office Facility  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 30B and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

Krauland, P.A.; Corle, S.G.

1997-09-01T23:59:59.000Z

253

Grand Traverse Band Renewable Energy Feasibility Study in Wind, Biomass and Solar  

SciTech Connect (OSTI)

Renewable Energy Feasibility Study for wind, biomass, solar on the Grand Traverse Band tribal lands from 2005 - 2008

Suzanne McSawby, Project Director

2008-12-31T23:59:59.000Z

254

Project Controls  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

1997-03-28T23:59:59.000Z

255

The Construction and Maintenance Plan for a Grand Banks Multi-Purpose Pipeline  

E-Print Network [OSTI]

The Construction and Maintenance Plan for a Grand Banks Multi-Purpose Pipeline D.W. (Don) Wilson, Director, North Atlantic Pipeline Partners, L.P. NOIA 2000 Conference June, 2000 #12;Grand Banks Multi-Purpose Pipeline Route January 2000 Grand Banks of Newfoundland Newfoundland Come by Chance St. John's Argentia 50o

Bruneau, Steve

256

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20

257

Yakima Fisheries Project : Final Environmental Impact Statement : Summary.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) proposes to fund the Yakima Fisheries Project (YFP) to undertake fishery research and mitigation activities in the Yakima River Basin. The State of Washington and the Yakama Indian Nation (YIN) would jointly direct the project. In cooperation with BPA, the project managers propose to construct, operate and maintain anadromous (e.g. salmon) fish production facilities The goal is to conduct research activities designed to increase knowledge of supplementation techniques. These techniques would be applied to rebuild naturally spawning anadromous fish stocks historically present in the Yakima River Basin and, ultimately, those throughout the Columbia River Basin. Eventually, the YFP might involve the supplementation of all stocks of anadromous fish known to have occurred in the Yakima Basin. However, at this time only two action alternatives have been proposed, in addition to the No Action alternative: Alternative (1) would supplement depressed naturally spawning populations of upper Yakima spring chinook salmon; Alternative (2) (preferred) would include all actions under Alternative 1; it would also add a study to determine the feasibility of re-establishing a naturally spawning population and a significant fall fishery for coho salmon in the Yakima Basin (Coho smolts are currently being imported from another basin under the Columbia River Basin Fish Management Plan; the stock is now virtually eliminated from the Basin.)

United States. Bonneville Power Administration; Washington (State). Dept. of Fish and Wildlife; Confederated Tribes and Bands of the Yakama Nation, Washington.

1996-01-01T23:59:59.000Z

258

City of Grand Rapids Building Solar Roof Demonstration  

SciTech Connect (OSTI)

Grand Rapids, Michigan is striving to reduce it environmental footprint. The municipal government organization has established environmental sustainability policies with the goal of securing 100% of its energy from renewable sources by 2020. This report describes the process by which the City of Grand Rapids evaluated, selected and installed solar panels on the Water/Environmental Services Building. The solar panels are the first to be placed on a municipal building. Its new power monitoring system provides output data to assess energy efficiency and utilization. It is expected to generate enough clean solar energy to power 25 percent of the building. The benefit to the public includes the economic savings from reduced operational costs for the building; an improved environmentally sustainable area in which to live and work; and increased knowledge about the use of solar energy. It will serve as a model for future energy saving applications.

DeClercq, Mark; Martinez, Imelda

2012-08-31T23:59:59.000Z

259

Citrus Varieties for the Lower Rio Grande Valley.  

E-Print Network [OSTI]

Lf BRARY, /A & NI COLLEGE, b TEXAS AGRICULTURAL EXPERIMENT STATION A. B. CONNER, DIRECTOR, College Station, Texas CITRUS VARIETIES FOR THE LOWER RIO GRANDE VALLEY Mr. H. FRIEND AND J. F. WOOD Division of Horticulture LIBRARY \\gxict... perishable nature of this type of fruit. Limes and lemons may be grown by persons who are financially able to equip their orchards with heaters. There are many types of citrus fruits that may be grown as ornamentals or for special purposes, but none...

Wood, J. F. (John Fielding); Friend, W. H. (William Heartsill)

1941-01-01T23:59:59.000Z

260

Grand Coulee-Creston_FONSI_and_MAP_27May2014  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensional Subject: GuidanceNotGrand Coulee-Creston Transmission Line

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

SUNSHOT GRAND CHALLENGE SUMMIT AND PEER REVIEW EVENT PROGRAM  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromCommentsRevolving STATEMENT OF MELANIESUBSIDYSUNSHOT GRAND

262

Cenozoic Landscape Evolution of the Grand Canyon Region, Arizona  

E-Print Network [OSTI]

in the eastern Grand Canyon by John Lee, Alec Waggoner, and Eugene Symanzski in October, 2005. Mineral separation and sample analysis was done by John Lee at the University of Kansas. Investigation utilizes thermokinetic modeling of synthetically produced 3... of the Colorado River through modern topographic highs. 2.3 Approach and Methodology 2.3.1 Isotherm Deflection The effects of topographic cooling in areas with high-amplitude, long-wavelength topography has been shown to significantly perturb the geometries...

Lee, John

2008-02-26T23:59:59.000Z

263

Grand Blanc Generating Station Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio: Energy ResourcesGordon, Alabama:5 Climate Zone Subtype855°,Grand

264

Grand Mound, Washington: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio: Energy ResourcesGordon, Alabama:5 ClimateCounty isColorado:Grand

265

Pico Vermelho-Ribeira Grande Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoadingPenobscot County, Maine: Energy Resources2003)Pickaway County,Vermelho-Ribeira Grande

266

City of Grand Junction, Iowa (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDITOhio (Utility Company)Galion, Ohio (UtilityGoldthwaite,Grafton CityGrand

267

Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.  

SciTech Connect (OSTI)

The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

United States. Bonneville Power Administration.

1995-01-01T23:59:59.000Z

268

Circle Project  

E-Print Network [OSTI]

This project asks students to decide if a collection of points in space do or do not lie on a ... The project is accessible to linear algebra students who have studied ...

269

Grand Opening for Project LIBERTY: Nation's First Plant to Use Corn Waste  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel Cell VehicleEnergy (5Temperaturesand Industry ADepartmentGrandas

270

Estimated Benefits of IBWC Rio Grande Flood-Control Projects in the United States  

E-Print Network [OSTI]

reservoirs, dams, hydroelectric energy-generation facilities, floodways, and levees downstream of Caballo Reservoir in New Mexico. The international boundary between the United States (U.S.) and Mexico is over 1 is characterized by fifteen pairs of sister cities sustained by agriculture, import-export trade, service

271

Winning the Future: Grand Ronde Solar Projects Reduce Pollution, Cut Costs  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment of Dept.| WEATHERIZATION5 |and Analysis |3WindowsBiofuelNative|

272

Emergency Fish Restoration Project; Final Report 2002.  

SciTech Connect (OSTI)

Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleye (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a substantial impact to the economy. During the past several years the Chief Joseph Kokanee Enhancement project has been collecting data pertaining to fish entraining out of the lake through Grand Coulee Dam. During 1996 and 1997 the lake was deeply drawn down to accommodate the limited available water during a drought year and for the highly unusual draw-down of Lake Roosevelt during the critical Northwest power shortage. The goal of the project is to enhance the resident rainbow trout fishery in Lake Roosevelt lost as a result of the unusual operation of Grand Coulee dam during the drought/power shortage.

LeCaire, Richard

2003-03-01T23:59:59.000Z

273

Sugarcane Trials in the Lower Rio Grande Valley of Texas.  

E-Print Network [OSTI]

for Sugarcane Planting, Hills Farm Near Harlingen, Texas", Gulf Coast Magazine, Octo- ber 1908. 7. Anon. "Big Sugar Mills on Rio Grande ----", San Antonio Express, October 10, 1910. 8. Anon. Official Methods of Analysis of the Association of Ojficial.... 21. Hebcrt, L. P. "Culture of Sugarcane for Sugar Pmdw tion in Louisiana", Agriculture Hant1l)ook No. 262, Ap cultural Research Service, USDA, June 19Gf. I: 22. Hebert, L. Y. "The 1968 Sugarcane Variety Cearu L Florida", USDA CR-80-68, Nov. 1968...

Cowley, W. R.; Smith, B. A.

1969-01-01T23:59:59.000Z

274

Rio Grande Wild Turkey in Texas: Biology and Management  

E-Print Network [OSTI]

Rio Grande yekruT dliW In Texas: Biology and Management B-6198 08-07 James C. Cathey, Texas Cooperative Extension, The Texas A&M University System Kyle Melton, Department of Wildlife and Fisheries Sciences, Texas A&M University Justin... Department Upland Game Bird Program for funding for this work, and the Institute of Renewable Natural Resources at Texas A&M University for their support. Photographs were provided by D. Lang Alford, James R. Cathey, James C. Cathey, Kyle Melton, Justin...

Cathey, James; Melton, Kyle; Dreibelbis, Justin; Cavney, Bob; Locke, Shawn; DeMaso, Stephen; Schwertner, T. Wayne; Collier, Bret

2007-09-11T23:59:59.000Z

275

SU(5) Grand Unification in Pure Gravity Mediation  

E-Print Network [OSTI]

We discuss the proton lifetime in pure gravity mediation models with non-universal Higgs soft masses. Pure gravity mediation offers a simple framework for studying SU(5) grand unified theories with a split supersymmetry like spectra. We find that for much of the parameter space gauge coupling unification is quite good leading to rather long lifetimes for the proton. However, for $m_{3/2}\\sim 60$ TeV and $\\tan\\beta\\sim 4$, for which gauge coupling unification is also good, the proton lifetime is short enough that it could be in reach of future experiments.

Jason L. Evans; Natsumi Nagata; Keith A. Olive

2015-01-30T23:59:59.000Z

276

6-arm blue grand design of NGC 309  

E-Print Network [OSTI]

The geometry and physics of the spiral structure of the giant Hubble type Sc galaxy NGC 309 is studied. A schematic of two patterns with three arms in each is suggested for the blue spiral. The red and blue patterns form together a grand design with two-fold symmetry. A possible gas-dynamics explanation of the phenomenon is suggested which shows how the two-arm red spiral may induce the formation of the six-arm coherent blue spiral. Key words: galaxies: individual (NGC 309) -- galaxies: spiral

Chernin, A D

2015-01-01T23:59:59.000Z

277

Habitat Appraisal Guide for Rio Grande Wild Turkey  

E-Print Network [OSTI]

). Spears et al. (2007) found ground vegetation positively infl uenced prefl ight poult survival. Shrubs 2.0?6.5 feet in height provided important cover for prefl ight poults (Spears et al. 2007), and areas with shrubs ?6.5 feet were avoided. As poults... to determine if appropriate conditions exist. This habitat appraisal does not take into account rainfall, which is a very important factor for Rio Grande wild turkeys and habitat. Therefore, it may be necessary to envision areas as they might look under...

Cathey, James; Locke, Shawn; Ransom, Dean; DeMaso, Stephen; Schwertner, T. Wayne; Collier, Bret

2007-09-04T23:59:59.000Z

278

Methods toward improving 'Grande Rio 66' pepper seed germination  

E-Print Network [OSTI]

. Table 8 Cumulative daily germination percentage of 'Grande Rio 66' seeds after aerating in distilled water for 12, 24, 36, and 48 hours at a temperature of 27+2oC, dried for 24 hours and compared with dry seed placed in petri dishes at the same time... pumps through a series of tubing and rubber corks. After treatment, the seeds were removed from the tubes and dried for 24 hours at a temperature of approximately 38oC. Seeds were then placed in 100 x 15 mm sterilized, d1sposable, plast1c Petri dishes...

Rogers, Barbara Anna

1980-01-01T23:59:59.000Z

279

Moreau-Grand Electric Coop Inc | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Powerstories onFocus Area EnergyMohawk MunicipalMontvale, NewMoreau-Grand

280

DOE - Office of Legacy Management -- Grand Junction Sites  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou are here Home »HillNYEraGeneralGrand Junction Sites

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Rio Grande County, Colorado: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, searchVirginia Blue RidgeUniversity ofGeothermalRiggins,RioRio Grande County

282

Rio Grande Electric Coop, Inc (New Mexico) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, searchVirginia Blue RidgeUniversity ofGeothermalRiggins,RioRio Grande

283

Rio Grande Rift Geothermal Region | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, searchVirginia Blue RidgeUniversity ofGeothermalRiggins,RioRio Grande

284

Rio Grande Rift Geothermal Region | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, searchVirginia Blue RidgeUniversity ofGeothermalRiggins,RioRio GrandeRio

285

Grand Ridge II Wind Farm | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat Jump to:Photon Place: Golden, COIndiana Jump to:Grand Ridge II Wind Farm

286

Grand Ridge III Wind Farm | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat Jump to:Photon Place: Golden, COIndiana Jump to:Grand Ridge II Wind

287

Grand Terrace, California: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat Jump to:Photon Place: Golden, COIndiana Jump to:Grand Ridge II

288

Grand Traverse County, Michigan: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat Jump to:Photon Place: Golden, COIndiana Jump to:Grand Ridge IICounty,

289

Grand Challenges | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched5 IndustrialIsadore Perlman,Bios High EnergyEliane SJulyFrequentlyGrand

290

Project Construction  

Broader source: Energy.gov [DOE]

Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

291

Magnesium Projects  

Broader source: Energy.gov (indexed) [DOE]

cyberinfrastructure projects and will be augmented by original research in Computer Science and Software Engineering towards the creation of large, distributed, autonomic and...

292

Couse/Tenmile Creeks Watershed Project Implementation : 2007 Conservtion Projects. [2007 Habitat Projects Completed].  

SciTech Connect (OSTI)

The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on private lands within Asotin County watersheds. The Tenmile Creek watershed is a 42 square mile tributary to the Snake River, located between Asotin Creek and the Grande Ronde River. Couse Creek watershed is a 24 square mile tributary to the Snake River, located between Tenmile Creek and the Grande Ronde River. Both watersheds are almost exclusively under private ownership. The Washington Department of Fish and Wildlife has documented wild steelhead and rainbow/redband trout spawning and rearing in Tenmile Creek and Couse Creek. The project also provides Best Management Practice (BMP) implementation throughout Asotin County, but the primary focus is for the Couse and Tenmile Creek watersheds. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Farm Service Agency (FSA), Salmon Recovery Funding Board (SRFB), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe (NPT), Washington Department of Ecology (DOE), National Marine Fisheries Service (NOAA Fisheries), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. The Asotin Subbasin Plan identified priority areas and actions for ESA listed streams within Asotin County. Couse Creek and Tenmile Creek are identified as protection areas in the plan. The Conservation Reserve Enhancement Program (CREP) has been successful in working with landowners to protect riparian areas throughout Asotin County. Funding from BPA and other agencies has also been instrumental in protecting streams throughout Asotin County by utilizing the ridge top to ridge top approach.

Asotin County Conservation District

2008-12-10T23:59:59.000Z

293

Geomorphology of plutonium in the Northern Rio Grande  

SciTech Connect (OSTI)

Nearly all of the plutonium in the natural environment of the Northern Rio Grande is associated with soils and sediment, and river processes account for most of the mobility of these materials. A composite regional budget for plutonium based on multi-decadal averages for sediment and plutonium movement shows that 90 percent of the plutonium moving into the system is from atmospheric fallout. The remaining 10 percent is from releases at Los Alamos. Annual variation in plutonium flux and storage exceeds 100 percent. The contribution to the plutonium budget from Los Alamos is associated with relatively coarse sediment which often behaves as bedload in the Rio Grande. Infusion of these materials into the main stream were largest in 1951, 1952, 1957, and 1968. Because of the schedule of delivery of plutonium to Los Alamos for experimentation and weapons manufacturing, the latter two years are probably the most important. Although the Los Alamos contribution to the entire plutonium budget was relatively small, in these four critical years it constituted 71--86 percent of the plutonium in bedload immediately downstream from Otowi.

Graf, W.L. [Arizona Univ., Tempe, AZ (United States). Dept., of Geography

1993-03-01T23:59:59.000Z

294

E-Print Network 3.0 - aires grandes inversiones Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

la sera e la mattina... temperatura dell'acqua non risponde velocemente al riscaldamento solare per la grande capacit termica e la... .), a mesoscala (passaggio da zone urbane...

295

INSIDE Waitt Advanced Biophotonics Center Grand Opening One on One with...Thomas Albright REMEMBERINGWylie  

E-Print Network [OSTI]

INSIDE » Waitt Advanced Biophotonics Center Grand Opening » One on One with...Thomas Albright Discovery of plant proteins may boost agricultural yields and biofuel production 20 Complex wiring

Bellugi, Ursula

296

Estimating commuter rail demand to Kendall Square along the Grand Junction Corridor .  

E-Print Network [OSTI]

??Since acquiring the Grand Junction Railroad in June 2010 from CSX, the Massachusetts Bay Transit Authority (MBTA) has explored the possibility of using the line… (more)

Dohm, James

2012-01-01T23:59:59.000Z

297

Feasibility for Reintroducing Sockeye and Coho Salmon in the Grande Ronde Basin, 1998 Final Report.  

SciTech Connect (OSTI)

A report concerning the feasibility of reintroducing Sockeye Salmon into Wallowa Lake and Coho Salmon into the Grande Ronde River Basin.

Cramer, Steven P.; Witty, Kenneth L. (S.P. Cramer and Associates, Inc., Gresham, OR)

1998-07-01T23:59:59.000Z

298

Residential and commercial space heating and cooling with possible greenhouse operation; Baca Grande development, San Luis Valley, Colorado. Final report  

SciTech Connect (OSTI)

A feasibility study was performed to evaluate the potential of multipurpose applications of moderate-temperature geothermal waters in the vicinity of the Baca Grande community development in the San Luis Valley, Colorado. The project resource assessment, based on a thorough review of existing data, indicates that a substantial resource likely exists in the Baca Grande region capable of supporting residential and light industrial activity. Engineering designs were developed for geothermal district heating systems for space heating and domestic hot water heating for residences, including a mobile home park, an existing motel, a greenhouse complex, and other small commercial uses such as aquaculture. In addition, a thorough institutional analysis of the study area was performed to highlight factors which might pose barriers to the ultimate commercial development of the resource. Finally, an environmental evaluation of the possible impacts of the proposed action was also performed. The feasibility evaluation indicates the economics of the residential areas are dependent on the continued rate of housing construction. If essentially complete development could occur over a 30-year period, the economics are favorable as compared to existing alternatives. For the commercial area, the economics are good as compared to existing conventional energy sources. This is especially true as related to proposed greenhouse operations. The institutional and environmental analyses indicates that no significant barriers to development are apparent.

Goering, S.W.; Garing, K.L.; Coury, G.E.; Fritzler, E.A.

1980-05-01T23:59:59.000Z

299

Reservoir characterization of the Ribeira Grande (Azores) field  

SciTech Connect (OSTI)

A description is made of the geothermal system located at the Ribeira Grande area in San Miguel Island at Azores. To date, three deep wells have been drilled, two of them are considered to be productive and the other one, although capable of production, has been used as an observation well due to completion problems. One of the wells is presently connected to a 3 MW-portable power plant. A series of tests, including both production and well testing, have been conducted in order to provide a reservoir characterization of the system. Several injection falloff, two rate and multiple rate tests have been carried out, as well as a preliminary interference-type test. A description of results obtained is provided.

Mete, L. (Aquater, Spa, Italy); Rivera-Rodriguez, J.

1982-01-01T23:59:59.000Z

300

Project X  

E-Print Network [OSTI]

provided by Project X would be a cost- effective approach toin Section I and for the cost estimate necessary as part ofby DOE order 413.3b. The cost range required for CD-0 will

Holmes, Steve

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Project Manager  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a project manager in the Fuel Cell Technologies Office in the DOE-EERE Office of Transportation responsible for a wide variety of highly...

302

Project Title:  

Broader source: Energy.gov (indexed) [DOE]

0 181 0 Hazardous Air Pollutants? Is the project subject to emissions limitations in an Air Quality 0 181 0 Control Region? 2 Revised on: 11122008 NEPA COMPLIANCE SURVEY Impacts...

303

Magnetic Flux Transport Simulations of Solar Surface Magnetic Distributions During a Grand Minimum.  

E-Print Network [OSTI]

, Scotland, KY16 9SS. Abstract. It is well known that magnetic activity on the Sun modulates from one cycle strongly depend on the phase of the cycle in which the grand minimum starts and whether it lasts for an odd or even number of cycles. If the grand minimum starts around cycle minimum then a signi#12;cant amount

Mackay, Duncan

304

Institutional Adjustments for Coping with Prolonged and Severe Drought in the Rio Grande Basin  

E-Print Network [OSTI]

and industrial needs of cities like Albuquerque and El Paso, the Rio Grande represents a significant resource in the arid southwest. In 1938, Congress approved the Rio Grande Compact which divided the annual water flow among the three states of Colorado, New...

Ward, Frank A.; Young, Robert; Lacewell, Ronald D.; King, J. Philip; Frasier, Marshall; McGuckin, J. Thomas; DuMars, Charles R.; Booker, James; Ellis, John; Srinivasan, Raghavan

305

Research and management of soil, plant, animal, and human resources in the Middle Rio Grande Basin  

E-Print Network [OSTI]

Research and management of soil, plant, animal, and human resources in the Middle Rio Grande Basin in 1994 called. "Ecology, diversity, and sustainability of soil, plant, animal, and human resources, Diversity, and Sustainability of Soil, Plant, Animal, and Human resources of the Rio Grande Basin" (Finch

306

Is There A Grand Challenge or X-Prize for Data Mining? Gregory Piatetsky-Shapiro  

E-Print Network [OSTI]

· Identifying all genes and potential therapeutic targets for cancer · A text-mining and understanding systemIs There A Grand Challenge or X-Prize for Data Mining? Gregory Piatetsky-Shapiro KDnuggets gps and motivating Grand Challenge problems for Data Mining, focusing on bioinformatics, multimedia mining, link

Grossman, Robert

307

J. Field Ornithol. 76(1):1220, 2005 Survival of Rio Grande Wild Turkey chicks  

E-Print Network [OSTI]

12 J. Field Ornithol. 76(1):12­20, 2005 Survival of Rio Grande Wild Turkey chicks Brian L. Spears,1 determined pre-flight daily survival of Rio Grande Wild Turkey (Meleagris gallopavo intermedia) chicks from, survival, telemetry, turkey Increasing population recruitment through reproductive success is often key

Wallace, Mark C.

308

BOTANICAL SURVEY OF WINTER PARK RESORT, ARAPAHO NATIONAL FOREST, GRAND COUNTY, COLORADO  

E-Print Network [OSTI]

BOTANICAL SURVEY OF WINTER PARK RESORT, ARAPAHO NATIONAL FOREST, GRAND COUNTY, COLORADO Colorado Natural Heritage Program College of Natural Resources, 8002 Campus Delivery Colorado State University Fort Collins, Colorado 80523-8002 #12;BOTANICAL SURVEY OF WINTER PARK RESORT, ARAPAHO NATIONAL FOREST, GRAND

309

Project Fact Sheet Project Update  

E-Print Network [OSTI]

medical and dental centre; shop and café area for students and vacation accommodation centre. The new & Figures: Budget: £51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on Site

310

Cave and cliff swallows as indicators of exposure and effects of environmental contaminants on birds from the Rio Grande, Texas  

E-Print Network [OSTI]

Cave (Petrochelidon fulva) and cliff swallows (Petrochelidon pyrrhonota) were collected along the Rio Grande and evaluated as potential indicators of environmental contamination. The Rio Grande receives toxic substances from agricultural...

Musquiz, Daniel

2004-11-15T23:59:59.000Z

311

Project Final Report UBC LBS Project Services1 Project Final Report UBC LBS Project Services2  

E-Print Network [OSTI]

Project Final Report UBC LBS Project Services1 #12;Project Final Report UBC LBS Project Services2 EXECUTIVE SUMMARY The purpose of the UBC Project Services web-based project management portal project on campus within Project Services, and with the rest of the UBC community. We began this project by defining

312

Cloudnet Project  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

Hogan, Robin

313

Microsoft Word - GrandCouleeFiber_CX_2014.docx  

Broader source: Energy.gov (indexed) [DOE]

it into compliance. The fiber would be moved underground through a new conduit of 4-foot PVC pipe that would be installed as part of this project. The conduit would be 130 feet...

314

Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Main report and appendices, Volume 6, Part 1  

SciTech Connect (OSTI)

Traditionally, probabilistic risk assessments (PRAS) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Recent studies and operational experience have, however, implied that accidents during low power and shutdown could be significant contributors to risk. In response to this concern, in 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The program consists of two parallel projects being performed by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). The program objectives include assessing the risks of severe accidents initiated during plant operational states other than full power operation and comparing the estimated risks with the risk associated with accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program is that of a Level-3 PRA. The subject of this report is the PRA of the Grand Gulf Nuclear Station, Unit 1. The Grand Gulf plant utilizes a 3833 MWt BUR-6 boiling water reactor housed in a Mark III containment. The Grand Gulf plant is located near Port Gibson, Mississippi. The regime of shutdown analyzed in this study was plant operational state (POS) 5 during a refueling outage, which is approximately Cold Shutdown as defined by Grand Gulf Technical Specifications. The entire PRA of POS 5 is documented in a multi-volume NUREG report (NUREG/CR-6143). The internal events accident sequence analysis (Level 1) is documented in Volume 2. The Level 1 internal fire and internal flood analyses are documented in Vols 3 and 4, respectively.

Brown, T.D.; Kmetyk, L.N.; Whitehead, D.; Miller, L. [Sandia National Labs., Albuquerque, NM (United States); Forester, J. [Science Applications International Corp., Albuquerque, NM (United States); Johnson, J. [GRAM, Inc., Albuquerque, NM (United States)

1995-03-01T23:59:59.000Z

315

PROJECT REQUEST FORM PROJECT HOLDER INFORMATION  

E-Print Network [OSTI]

PROJECT REQUEST FORM Last Name: Email: PROJECT HOLDER INFORMATION UCID:Last Name: Email: Institute if different than Project Holder) First Name: Project Short Name: (50 characters max) (for eFIN view only) Project Title: PROJECT INFORMATION Start Date (MM/DD/YYYY): End Date (MM/DD/YYYY): For Questions or HELP

de Leon, Alex R.

316

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Name: Centre for Assisted Robotic Surgery Number: BESS1002b Project Champion: Professor Guang-Zong Yang of the refurbishment is to renew and expand the laboratory space for Robotic Assisted Surgery at the South Kensington Campus as par to the Hamlyn Centre for Robotic Surgery. The overall programme incorpo- rates both core

317

The SO2 Allowance Trading System: The Ironic History of a Grand Policy Experiment  

E-Print Network [OSTI]

Two decades have passed Two decades have passed since the Clean Air Act Amendments of 1990 launched a grand experiment in market-based environmental policy: the SO2 cap-and-trade system. That system performed well but ...

Schmalensee, Richard

318

Building a Grand Paris: French Neoliberalism and the Politics of Urban Spatial Production  

E-Print Network [OSTI]

de la décentralisation. Paris: L’Harmattan, 2009. Williams,Jobert, 21–86. Paris: L’Harmattan, 1994. Jordan, David P.by Bruno Jobert (Paris: L’Harmattan, 1994). Blanc, Le Grand

Enright, Theresa Erin

2012-01-01T23:59:59.000Z

319

Vegetation, soils, and surface hydrology of playa landforms in the Rio Grande Plains, Texas  

E-Print Network [OSTI]

Playas in the Rio Grande Plains of southern Texas were compared with respect to their: 1) size, shape, soil properties, and microtopography, 2) vegetation composition and structure, 3) surface water accumulation potential, and 4) disturbance history...

Farley, Andrea Lee

2012-06-07T23:59:59.000Z

320

Microsoft Word - CX-GrandCoulee-OkanoganWP-AR-Landing_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Cleareance Memorandum Jim Semrau Robert Keudell Road Engineer - TELF-TPP-3 Line Foreman III - TFWK-Grand Coulee Todd Wehner...

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Microsoft Word - CX-GrandCoulee-ChiefJoseph_ARandWood Poles_WEB...  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Cleareance Memorandum Todd Wehner Road Engineer - TELF-TPP-3 Robert Keudell Line Foreman III - TFWK-Grand Coulee Robert Zellar...

322

E-Print Network 3.0 - alto rio grande Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sciences 73 Bull. Soc. PatJi. Ex., 89, 1996, 128-136 Summary: DEN-2, sont touchs (du nord au sud) les tats du Ceara, Rio Grande do Norte, Paraiba, Pernambuco... :...

323

The systemic and ideological sources of grand strategic doctrine : American foreign policy in the twentieth century  

E-Print Network [OSTI]

What explains the puzzling variation in America's foreign policy posture? This study proposes and tests a theory of American grand strategy that places an emphasis on two key variables: the ideological content of American ...

Green, Brendan Rittenhouse

2011-01-01T23:59:59.000Z

324

Media Invitation: 2014 SunShot Grand Challenge Summit and Peer...  

Office of Environmental Management (EM)

Energy (DOE) SunShot Initiative's 2014 Grand Challenge Summit and Peer Review in Anaheim, California from May 19-22, 2014. Only three years into the decade-long SunShot Initiative,...

325

Influences of vegetation characteristics and invertebrate abundance of Rio Grande wild turkey populations, Edwards Plateau, Texas  

E-Print Network [OSTI]

Since 1970, Rio Grande wild turkey (Meleagris gallapavo intermedia) numbers in the southern region of the Edwards Plateau of Texas have been declining. Nest-site characteristics and invertebrate abundance were hypothesized as limiting wild turkey...

Randel, Charles Jack

2005-02-17T23:59:59.000Z

326

An applied paleoecology case study: Bahia Grande, Texas prior to construction of the Brownsville Ship Channel  

E-Print Network [OSTI]

out a comprehensive survey of the entire Texas coastline in the 1970s and 1980s including an examination of sedimentology, geochemistry, bathymetry, and both live and dead benthic invertebrates (White et al. 1983, 1986, 1989). Although Bahia Grande...

Lichlyter, Stephen Alvah

2006-08-16T23:59:59.000Z

327

Nesting ecology of Rio Grande wild turkeys in the Edwards Plateau of Texas  

E-Print Network [OSTI]

NESTING ECOLOGY OF RIO GRANDE WILD TURKEYS IN THE EDWARDS PLATEAU OF TEXAS A Thesis by JUSTIN ZACHARY DREIBELBIS Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements... for the degree of MASTER OF SCIENCE August 2008 Major Subject: Wildlife and Fisheries Sciences NESTING ECOLOGY OF RIO GRANDE WILD TURKEYS IN THE EDWARDS PLATEAU OF TEXAS A Thesis by JUSTIN ZACHARY DREIBELBIS Submitted to the Office...

Dreibelbis, Justin Zachary

2009-05-15T23:59:59.000Z

328

Industrial Heat Pumps: Appropriate Placement and Sizing Using the Grand Composite  

E-Print Network [OSTI]

INDUSTRIAL HEAT PUMPS: APPROPRIATE PLACEMENT AND SIZING USING THE GRAND COMPOSITE Saidas M.-Ranade. Eric Hindmarsh and David Boland TENSA Services, Houston, TX ABSTRACT Correct thermodynamic placement ofheat~umps is a necessary condition... characteristics of the total process may result in inefficient designs and is detrimental to the "image" of industrial heat pumps. In this paper the heat pump placement is dis cussed in the context of the total process. The process grand composite curve...

Ranade, S. M.; Hindmarsh, E.; Boland, D.

329

Economies of size in municipal water treatment technologies: Texas lower Rio Grande Valley  

E-Print Network [OSTI]

ECONOMIES OF SIZE IN MUNICIPAL WATER TREATMENT TECHNOLOGIES: TEXAS LOWER RIO GRANDE VALLEY A Thesis by CHRISTOPHER NEIL BOYER Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements... for the degree of MASTER OF SCIENCE August 2008 Major Subject: Agricultural Economics ECONOMIES OF SIZE IN MUNICIPAL WATER TREATMENT TECHNOLOGIES: TEXAS LOWER RIO GRANDE VALLEY A Thesis by CHRISTOPHER NEIL BOYER Submitted to the Office of Graduate Studies...

Boyer, Christopher Neil

2008-10-10T23:59:59.000Z

330

Greenhouse space allocation in the ornamental foliage industry in the Rio Grande Valley of Texas  

E-Print Network [OSTI]

GREENHOUSE SPACE ALLOCATION IN THE ORNAMENTAL FOLIAGE INDUSTRY IN THE RIO GRANDE VALLEY OF TEXAS A Thesis by BRENDA DEA LANG KRAFKA Submitted to the Graduate College of Texas AAM University in partial fulfillment of the requirements... for the degree of MASTER OF SCIENCE August 1986 Major Subject: Agricultural Economics GREENHOUSE SPACE ALLOCATION IN THE ORNAMENTAL FOLIAGE INDUSTRY IN THE RIO GRANDE VALLEY OF TEXAS A Thesis by BRENDA DEA LANG KRAFKA Approved as to style and content by...

Krafka, Brenda Dea Lang

1986-01-01T23:59:59.000Z

331

Interacting Topological Insulator and Emergent Grand Unified Theory  

E-Print Network [OSTI]

Motivated by the Pati-Salam Grand Unified Theory, we study $(4+1)d$ topological insulators with $SU(4) \\times SU(2)_1 \\times SU(2)_2$ symmetry, whose $(3+1)d$ boundary has 16 flavors of left-chiral fermions, which form representations $(\\mathbf{4}, \\mathbf{2}, \\mathbf{1})$ and $(\\bar{\\mathbf{4}}, \\mathbf{1}, \\mathbf{2})$. The key result we obtain is that, without any interaction, this topological insulator has a $\\mathbb{Z}$ classification, namely any quadratic fermion mass operator at the $(3+1)d $ boundary is prohibited by the symmetries listed above; while under interaction this system becomes trivial, namely its $(3+1)d$ boundary can be gapped out by a properly designed short range interaction without generating nonzero vacuum expectation value of any fermion bilinear mass, or in other words, its $(3+1)d$ boundary can be driven into a "strongly coupled symmetric gapped (SCSG) phase". Based on this observation, we propose that after coupling the system to a dynamical $SU(4) \\times SU(2)_1 \\times SU(2)_2$ lattice gauge field, the Pati-Salam GUT can be fully regularized as the boundary states of a $(4+1)d$ topological insulator with a {\\it thin} fourth spatial dimension, the thin fourth dimension makes the entire system generically a $(3+1)d$ system. The mirror sector on the opposite boundary will {\\it not} interfere with the desired GUT, because the mirror sector is driven to the SCSG phase by a carefully designed interaction and is hence decoupled from the GUT.

Yi-Zhuang You; Cenke Xu

2015-03-23T23:59:59.000Z

332

Hallmark Project  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietip sheetK-4In 2013 many autoThis road map isofAOnOctoberProject

333

PROJECT SUMMARY  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLCDieselEnergyHistoryWATER-ENERGYofPROJECT

334

Custom Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases onOrganization FY 2012 FY 2013 FYCurtailment DateCustom-Projects

335

Project Gnome  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada winsProgress ReportProject CostEnergy

336

Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1. Volume 5: Analysis of core damage frequency from seismic events for plant operational state 5 during a refueling outage  

SciTech Connect (OSTI)

In 1989 the US Nuclear Regulatory Commission (NRC) initiated an extensive program to examine carefully the potential risks during low-power and shutdown operations. The program included two parallel projects, one at Sandia National Laboratories studying a boiling water reactor (Grand Gulf), and the other at Brookhaven National Laboratory studying a pressurized water reactor (Surry Unit 1). Both the Sandia and Brookhaven projects have examined only accidents initiated by internal plant faults---so-called ``internal initiators.`` This project, which has explored the likelihood of seismic-initiated core damage accidents during refueling outage conditions, is complementary to the internal-initiator analyses at Brookhaven and Sandia. This report covers the seismic analysis at Grand Gulf. All of the many systems modeling assumptions, component non-seismic failure rates, and human effort rates that were used in the internal-initiator study at Grand Gulf have been adopted here, so that the results of the study can be as comparable as possible. Both the Sandia study and this study examine only one shutdown plant operating state (POS) at Grand Gulf, namely POS 5 representing cold shutdown during a refueling outage. This analysis has been limited to work analogous to a level-1 seismic PRA, in which estimates have been developed for the core-damage frequency from seismic events during POS 5. The results of the analysis are that the core-damage frequency for earthquake-initiated accidents during refueling outages in POS 5 is found to be quite low in absolute terms, less than 10{sup {minus}7}/year.

Budnitz, R.J. [Future Resources Associates, Inc., Berkeley, CA (United States); Davis, P.R. [PRD Consulting (United States); Ravindra, M.K.; Tong, W.H. [EQE International, Inc., Irvine, CA (United States)

1994-08-01T23:59:59.000Z

337

Part II: Project Summaries Project Summaries  

E-Print Network [OSTI]

Part II: Project Summaries Part II Project Summaries #12 generally cannot be achieved for reasonable computational cost. Applications that require modeling, and in nondestructive testing. The objective of this project is to advance the state of the art in electromagnetic

Perkins, Richard A.

338

Project Management Practices  

Energy Savers [EERE]

on the DOE Project Management web page. 1.2 INTENDED USE Federal Project Directors, Contracting Officers, Contracting Officer's Technical Representatives, Integrated Project Team...

339

PROCEDURES FOR ARC PROJECTS  

E-Print Network [OSTI]

PROCEDURES FOR ARC PROJECTS Revised - May 2013 Agricultural Research Center Washington State University #12;Table of Contents THE PROJECT SYSTEM, AN INTRODUCTION................................................................................. 5 DEVELOPING AN ARC PROJECT

Collins, Gary S.

340

Project Management Lessons Learned  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

2008-08-05T23:59:59.000Z

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Windy Gap Firming Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure projects Interconnection OASIS OATT Windy Gap Firming Project, Final Environmental Impact Statement, DOEEIS-0370 (cooperating agency) Western's proposed...

342

Perspectives on Project Finance  

Broader source: Energy.gov [DOE]

Plenary III: Project Finance and Investment Perspectives on Project Finance John May, Managing Partner, Stern Brothers & Co.

343

NSTX Upgrade Project Project Execution Plan  

E-Print Network [OSTI]

NSTX Upgrade Project Project Execution Plan 6 PPPL Laboratory Director S.Prager Deputy Director.Gentile Centerstack Dsgn & Fab J. Chrzanowski NSTX Upgrade Project Manager R. Strykowsky Deputy and Construction Manager E. Perry Project Controls S. Langish NSTXCenterstack Manager L. Dudek NSTXNeutral Beam Manager T

Princeton Plasma Physics Laboratory

344

NSTX Upgrade Project Project Execution Plan  

E-Print Network [OSTI]

NSTX Upgrade Project Project Execution Plan Appendix 1 - WBS Dictionary 25 Appendix 1 - NSTX Upgrade Project Work Breakdown Structure This Work Breakdown Structure (WBS) organizes and defines the scope of the NSTX Upgrade using the WBS as established by the original NSTX project and modified

Princeton Plasma Physics Laboratory

345

CIMI PROJECT LONG TERM THEMATIC PROJECT  

E-Print Network [OSTI]

thematic projects (3 months) on specific topics in mathematics, computer science and their interactionsCIMI PROJECT LONG TERM THEMATIC PROJECT This document aims at providing guidance on the format to be used when submitting a scientific project to CIMI Executive Committee. CIMI will support long term

Ledoux, Michel

346

Livingston Solar Canopy Project The Project  

E-Print Network [OSTI]

,000 high efficiency solar panels on canopy structures over two major surface parking areasLivingston Solar Canopy Project The Project: This project entails the installation of more than 40. In conjunction with the existing 1.4 megawatt solar energy facility on this campus, this project will generate

Delgado, Mauricio

347

Information Visualization Graduate Project (Group Project)  

E-Print Network [OSTI]

Information Visualization Fall 2011 Graduate Project (Group Project) (100 points total) Handed out:59PM Research Article due by online submission on Sunday, December 11, 2011, 11:59PM Project Demo due last week of classes The idea of the project is to take the knowledge and background that you

Rusu, Adrian

348

Project Title Project Sponsor (funding agency)  

E-Print Network [OSTI]

and procedures applicable to the above project; and we confirm that the PI is eligible to apply in accordance Project Title Project Sponsor (funding agency) Declaration of Principal Investigator (PI) I certify that: I agree that my participation in the project must be in accordance with all

Saskatchewan, University of

349

Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Grand Junction, Colorado  

SciTech Connect (OSTI)

This Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Near Grand Junction, Colorado evaluates potential impacts to public health or the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in an off-site disposal cell by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial activities at the site were conducted from 1989 to 1993. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project. This risk assessment evaluates the most contaminated ground water that flows beneath the processing site toward the Colorado River. The monitor wells that have consistently shown the highest concentrations of most contaminants are used to assess risk. This risk assessment will be used in conjunction with additional activities and documents to determine what remedial action may be needed for contaminated ground water at the site. This risk assessment follows an approach outlined by the EPA. the first step is to evaluate ground water data collected from monitor wells at the site. Evaluation of these data showed that the contaminants of potential concern in the ground water are arsenic, cadmium, cobalt, fluoride, iron, manganese, molybdenum, nickel, sulfate, uranium, vanadium, zinc, and radium-226. The next step in the risk assessment is to estimate how much of these contaminants people would be exposed to if they drank from a well installed in the contaminated ground water at the former processing site.

Not Available

1994-06-01T23:59:59.000Z

350

Chopwell Wood Health Project  

E-Print Network [OSTI]

Chopwell Wood Health Project An innovative project of school visits and General Practitioner. The project took place at Chopwell Wood a 360 hectare mixed woodland managed by the Forestry Commission to carry on being involved in the project. Next stage of the project Although the project leader has now

351

Sustainability Project Fund Application Form Requirements Project Title  

E-Print Network [OSTI]

Sustainability Project Fund Application Form Requirements Project Title: Budget Requested: Applicant/Project Leader: Faculty/Department: Email: Daytime Phone: Project Team: (Please include. Project Overview Project summary: · Provide a brief background, describing the project, objectives

Volesky, Bohumil

352

Specific heat and bimodality in canonical and grand canonical versions of the thermodynamic model  

E-Print Network [OSTI]

We address two issues in the thermodynamic model for nuclear disassembly. Surprisingly large differences in results for specific heat were seen in predictions from the canonical and grand canonical ensembles when the nuclear system passes from liquid-gas co-existence to the pure gas phase. We are able to pinpoint and understand the reasons for such and other discrepancies when they appear. There is a subtle but important difference in the physics addressed in the two models. In particular if we reformulate the parameters in the canonical model to better approximate the physics addressed in the grand canonical model, calculations for observables converge. Next we turn to the issue of bimodality in the probability distribution of the largest fragment in both canonical and grand canonical ensembles. We demonstrate that this distribution is very closely related to average multiplicities. The relationship of the bimodal distribution to phase transition is discussed.

G. Chaudhuri; S. Das Gupta

2007-08-26T23:59:59.000Z

353

The morphology of the urban edge : design projections for a commercial street  

E-Print Network [OSTI]

The renaissance of the American city's a phenomena of great potential but also one which threatens to destroy the fragile balance of elements that structure the city. In the rebuilding and reoccupation of these urban ...

Pinkham, Arthur W. (Arthur Wellington)

1986-01-01T23:59:59.000Z

354

Cotton hedging strategies using prices for Texas High Plains and Rio Grande Valley areas  

E-Print Network [OSTI]

COTTON REDGINC STRATEGIES USING PRICES FO=". TEXAS HIGH PLAINS AND RIO GRANDE VALLEY AREAS A Thesis by JOHN VERNON HOWARD, III Subm tted to the Graduate College of Texas A&M Universi'ty in partial fulfiiiment cf the requirement for the de...-ree o MASTER OP SC'ENCE August 1979 Major Subject: Agricultural Economics COTTON HEDGING STRATEGIES USING PRICES FOR TEXAS HIGH PLAINS AND RIO GRANDE VALLEY AREAS A Thesis JOHN VERNON HOWARD, III Approved as to style and content by: (C irman...

Howard, John V

1979-01-01T23:59:59.000Z

355

Select Economic Implications for the Biological Control of Arundo donax along the Rio Grande  

E-Print Network [OSTI]

Committee: Dr. M. Edward Rister, Dr. Ronald D. Lacewell Arundo donax, or giant reed, is a large, bamboo-like plant native to Spain that has invaded several thousand acres of the Rio Grande riparian in Texas. The plant grows to 18-24 feet, consuming... of the invasive plant species Arundo donax, also commonly referred to as Arundo, or giant reed. Arundo donax Arundo donax is a large, aquatic plant that is invading the riparian areas of the southwestern United States, particularly the Rio Grande Basin...

Seawright, Emily Kaye

2010-10-12T23:59:59.000Z

356

Economic Implications of Biological Control of Arundo donax in the Texas Rio Grande Basin  

E-Print Network [OSTI]

donax page viii of viii Economic Implications of Biological Control of Arundo donax in the Texas Rio Grande Basin ABSTRACT Arundo donax, or giant reed, is a large, bamboo-like plant that is native to Spain and has invaded several thousand acres... plant species Arundo donax, also commonly referred to as Arundo, or giant reed. Arundo donax, a.k.a. Giant Reed Arundo donax is a large, aquatic plant that is invading the riparian areas of the southwestern United States, particularly the Rio Grande...

Seawright, Emily; Rister, M. Edward; Lacewell, Ronald; McCorkle, Dean; Sturdivant, Allen; Goolsby, John; Yang, Chenghai; Harris, B.L.

357

Union County - La Grande, Oregon geothermal district heating: feasibility assessment. Final report  

SciTech Connect (OSTI)

This report presents an assessment of geothermal district heating in the City of La Grande, Oregon. Eight study area districts were analyzed to determine their economic feasibility. Results from the analyses conclude that certain districts within the City of La Grande are economically feasible if certain assumptions are correct. Development of geothermal district heating for these areas would provide direct energy and dollar savings to the building owners and would also provide direct and indirect benefits to low and moderate income households within the City.

Jenkins, H. II; Giddings, M.; Hanson, P.

1982-09-01T23:59:59.000Z

358

Special study on vegetative covers. [UMTRA Project  

SciTech Connect (OSTI)

This report describes the findings of a special study on the use of vegetative covers to stabilize tailings piles for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The principal rationale for using plants would be to establish a dynamic system for controlling water balance. Specifically, vegetation would be used to intercept and transpire precipitation to the atmosphere, rather than allowing water to drain into the tailings and mobilize contaminants. This would facilitate compliance with groundwater standards proposed for the UMTRA Project by the Environmental Protection Agency. The goals of the study were to evaluate the feasibility of using vegetative covers on UMTRA Project piles, define the advantages and disadvantages of vegetative covers, and develop general guidelines for their use when such use seems reasonable. The principal method for the study was to analyze and apply to the UMTRA Project the results of research programs on vegetative covers at other US Department of Energy (DOE) waste management facilities. The study also relied upon observations made of existing stabilized piles at UMTRA Project sites where natural vegetation is growing on the rock-covered surfaces. Water balance and erosion models were also used to quantify the long-term performance of vegetative covers planned for the topslopes of stabilized piles at Grand Junction and Durango, Colorado, two UMTRA Project sites where the decision was made during the course of this special study to use vegetative covers. Elements in the design and construction of the vegetative covers at these two sites are discussed in the report, with explanations of the differing features that reflect differing environmental conditions. 28 refs., 18 figs., 9 tabs.

Not Available

1988-11-01T23:59:59.000Z

359

Grand Junction projects office mixed-waste treatment program, VAC*TRAX mobile treatment unit process hazards analysis  

SciTech Connect (OSTI)

The objective of this report is to demonstrate that a thorough assessment of the risks associated with the operation of the Rust Geotech patented VAC*TRAX mobile treatment unit (MTU) has been performed and documented. The MTU was developed to treat mixed wastes at the US Department of Energy (DOE) Albuquerque Operations Office sites. The MTU uses an indirectly heated, batch vacuum dryer to thermally desorb organic compounds from mixed wastes. This process hazards analysis evaluated 102 potential hazards. The three significant hazards identified involved the inclusion of oxygen in a process that also included an ignition source and fuel. Changes to the design of the MTU were made concurrent with the hazard identification and analysis; all hazards with initial risk rankings of 1 or 2 were reduced to acceptable risk rankings of 3 or 4. The overall risk to any population group from operation of the MTU was determined to be very low; the MTU is classified as a Radiological Facility with low hazards.

Bloom, R.R.

1996-04-01T23:59:59.000Z

360

Project Sponsor Professor Peter  

E-Print Network [OSTI]

Project Sponsor Professor Peter McGearoge Project Director Nicki Matthew Audit / Quality Mazars Architect IT ServicesProcess Owners Build Team Lead Nicki Matthew Project Manager ­ Unit4 Joe Cairney Student Lifecycle Project Board InfrastructureDBA's TBC TBC TBC Process 1 Process 2 Project Sponsor ­ Unit

Levi, Ran

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Project Structure Elke Karrenberg  

E-Print Network [OSTI]

Project Structure Elke Karrenberg Project Manager, Head of Personnel Development Phone +49 6131 39-20634 Dr. Jana Leipold Project Staff, Personnel Development Consultant Phone +49 6131 39-25433 Antje Swietlik Project Staff Phone +49 6131 39-20140 Project Office JGU Leadership Forum Universitatis 3, Room 00

Kaus, Boris

362

The grand challenge of managing the petascale facility.  

SciTech Connect (OSTI)

This report is the result of a study of networks and how they may need to evolve to support petascale leadership computing and science. As Dr. Ray Orbach, director of the Department of Energy's Office of Science, says in the spring 2006 issue of SciDAC Review, 'One remarkable example of growth in unexpected directions has been in high-end computation'. In the same article Dr. Michael Strayer states, 'Moore's law suggests that before the end of the next cycle of SciDAC, we shall see petaflop computers'. Given the Office of Science's strong leadership and support for petascale computing and facilities, we should expect to see petaflop computers in operation in support of science before the end of the decade, and DOE/SC Advanced Scientific Computing Research programs are focused on making this a reality. This study took its lead from this strong focus on petascale computing and the networks required to support such facilities, but it grew to include almost all aspects of the DOE/SC petascale computational and experimental science facilities, all of which will face daunting challenges in managing and analyzing the voluminous amounts of data expected. In addition, trends indicate the increased coupling of unique experimental facilities with computational facilities, along with the integration of multidisciplinary datasets and high-end computing with data-intensive computing; and we can expect these trends to continue at the petascale level and beyond. Coupled with recent technology trends, they clearly indicate the need for including capability petascale storage, networks, and experiments, as well as collaboration tools and programming environments, as integral components of the Office of Science's petascale capability metafacility. The objective of this report is to recommend a new cross-cutting program to support the management of petascale science and infrastructure. The appendices of the report document current and projected DOE computation facilities, science trends, and technology trends, whose combined impact can affect the manageability and stewardship of DOE's petascale facilities. This report is not meant to be all-inclusive. Rather, the facilities, science projects, and research topics presented are to be considered examples to clarify a point.

Aiken, R. J.; Mathematics and Computer Science

2007-02-28T23:59:59.000Z

363

Economic impact study of the Uranium Mill Tailings Remedial Action Project in Colorado: Colorado state fiscal year 1993  

SciTech Connect (OSTI)

The Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year 1993 (July 1, 1992, through June 30, 1993). To capture employment benefits, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Rifle, and Gunnison, Colorado. An estimated 52 percent of the employees working on the UMTRA Project responded to this information request. Economic data were requested from each site prime subcontractor, as well as from the Remedial Action Contractor. The most significant benefits associated with the UMTRA Project in Colorado are summarized.

Not Available

1993-12-01T23:59:59.000Z

364

Journal of Coastal Research, Special Issue No. XX, 2014 The Grand Popo beach 2013 experiment, Benin, West Africa 1  

E-Print Network [OSTI]

the coast, together with large population densities (main cities: Abidjan, ABSTRACT Almar, R., Hounkonnou, N, West Africa 1 The Grand Popo beach 2013 experiment, Benin, West Africa: from short timescale processes., and Kestenare, E., 2014. The Grand Popo beach 2013 experiment, Benin, West Africa: from short timescale

365

THE APPLICATION OF THE LAND TRANSFORMATION, GROUNDWATER FLOW AND SOLUTE TRANSPORT MODELS FOR MICHIGAN'S GRAND TRAVERSE BAY  

E-Print Network [OSTI]

1 THE APPLICATION OF THE LAND TRANSFORMATION, GROUNDWATER FLOW AND SOLUTE TRANSPORT MODELS). The two hydrogeologic models that are being used here allow us to explore the dynamics of groundwater flow Meeting, New Orleans, Louisiana, March 14, 2001. #12;2 INTRODUCTION Grand Traverse Bay and the Grand

366

Part II: Project Summaries Project Summaries  

E-Print Network [OSTI]

Part II: Project Summaries Part II Project Summaries #12;22 Math & Computational Sciences Division generally cannot be achieved for reasonable computational cost. Applications that require modeling of this project is to advance the state of the art in electromagnetic computations by eliminating three existing

Perkins, Richard A.

367

CS348 Project 1 Oracle Project  

E-Print Network [OSTI]

CS348 Project 1 Oracle Project Due Date: 2/12/2009 You are going to use Oracle to design a simple; if nothing else, mark each query with its number. Turnin You may turn in the project for grading using the procedure described below. Run the following shell command (see 'man turnin' for details): turnin -c cs348

Elmagarmid, Ahmed K.

368

Project Name Project Number Tagging Type  

E-Print Network [OSTI]

Project Name Project Number Primary Tagging Type Secondary Tagging Type Fish Species Tagging/ Secondary Legal Driver (BiOp, MOA, Accord, etc.) Tagging Purpose Funded Entity Tagging Location Retrieval CWT Recovery Project 2010-036-00 CWT PIT Chinook, coho retrieval, analysis, address PSMFC sampling

369

Grant Helps Efficiently Rebuild Ohio Infrastructure | Department...  

Energy Savers [EERE]

ourselves to move forward with doing additional energy conservation and promoting renewables," Donna Winchester, environment manager for Dayton, says. "Our aging infrastructure...

370

A Tale of Two Cities: Greensburg Rebuilds  

E-Print Network [OSTI]

, Kansas, was like any rural community in America until a massive tornado leveled much of the town on May 4.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) arrived in Greensburg in June state, federal, and local agencies to identify ways to incorporate energy efficiency and renew- able

371

Libby-Troy Rebuild Oct 2007.indd  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample6, 2011 LawrenceE C HLesterDepartmentLiane B.

372

Greensburg, Kansas : rebuilding a green town  

E-Print Network [OSTI]

The tornado that hit Greensburg, Kansas, in May 2007, traveled down the center of Main Street at two hundred and five miles per hour and destroyed ninety-five percent of the town's built environment. The extensive damage ...

Bromberg, Anna (Anna Miriam)

2009-01-01T23:59:59.000Z

373

Re-Building Greensburg | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

by a tornado in 2007, yet came back to be one of the Nation's most energy-efficient, sustainable communities. Civic leaders and entrepreneurs helped rally residents behind the idea...

374

Gila to North Gila Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky LearningGet Assistance GetGiant Protease TPP II'sGiantGiftGila

375

Re-Building Greensburg | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared at 278, 298, andEpidermal Growth Factor.Tariff Rates FYRayRe

376

La Fisica come Informazione: l'universo `e un grande automa quantistico  

E-Print Network [OSTI]

La Fisica come Informazione: l'universo `e un grande automa quantistico Giacomo Mauro D'Ariano 26. Dipartimento di Fisica "A. Volta", via Bassi 6, I-27100 Pavia, Italy, http://www.qubit.it 1 #12;quantization teoria pi`u fondamentale, assegnata in ter- mini di un automa cellulare quantistico (QCA). La fisica

D'Ariano, Giacomo Mauro

377

GESTION DURABLE DES RISQUES D'AFFAISSEMENT MINIER : CHOIX DE STRATEGIES -CAS DE MOYEUVRE-GRANDE.  

E-Print Network [OSTI]

GESTION DURABLE DES RISQUES D'AFFAISSEMENT MINIER : CHOIX DE STRATEGIES - CAS DE MOYEUVRE abandonnées. La gestion des risques qui en découle peut se faire selon différentes stratégies et conduire à un application à l'étude du cas de la commune de Moyeuvre-Grande (57) à travers une analyse coûts

Boyer, Edmond

378

Flow, Salts, and Trace Elements in the Rio Grande: A Review  

E-Print Network [OSTI]

. Juarez 290 Matamoros 72 Nueva Laredo 67 Reynosa 43 Cd. Acuna 32 Piedras Negras 30 Total 534 Border to Calif. & Arizona Tijuana 334 Mexicali 131 Nogales 64 Tecate Ensenada 33 Others 79 Total 641 Interior Mexico Total 285 Grand Total 1460 exceed 20 and 10...

Miyamoto, S.; Fenn, L. B.; Swietlik, D.

1995-01-01T23:59:59.000Z

379

International Agriculture Fellowship: A Gates Foundation Grand Challenges Exploration in Endophytic Biological Control  

E-Print Network [OSTI]

International Agriculture Fellowship: A Gates Foundation Grand Challenges Exploration in Endophytic Biological Control Who we are: The International Center for Tropical Agriculture (CIAT) is a member institute of the Consultative Group on International Agricultural Research (CIAR). Based in Cali, Colombia, we focus

Ferrara, Katherine W.

380

Data Mining: Data Analysis on a Grand Scale? \\Lambda Padhraic Smyth  

E-Print Network [OSTI]

Data Mining: Data Analysis on a Grand Scale? \\Lambda Padhraic Smyth Information and Computer data mining has evolved largely as a result of efforts by computer scientists to address the needs of ``data owners'' in extracting useful information from massive observational data sets. Because

Smyth, Padhraic

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

SunShot Grand Challenge Summit: Bright Outlook to Achieve SunShot Goal  

Office of Energy Efficiency and Renewable Energy (EERE)

Last week, hundreds of solar energy leaders gathered in southern California to participate in SunShot’s biennial Grand Challenge Summit. Read a recap of the four-day event, which focused on making solar energy fully cost-competitive with traditional forms of energy by 2020.

382

FOR IMMEDIATE RELEASE 7/2/10 Grand Opening and Dedication of  

E-Print Network [OSTI]

patriots and pilots, so bring your family and enjoy the grand opening of the Capt. Fletcher E. Adams 357th to Leiston Field in Great Britain as they sought to protect the bomber trains successfully wreaking havoc son alone in the small village of Ida, Louisiana. Many of the Aces of the 357th went on to lead lives

383

Tree rings and multiseason drought variability in the lower Rio Grande Basin, USA  

E-Print Network [OSTI]

compound the effect of droughts, impact natural vegetation and phenological responses, and exacerbate waterTree rings and multiseason drought variability in the lower Rio Grande Basin, USA C. A. Woodhouse,1 9 January 2013; published 8 February 2013. [1] Agriculture and ranching in semiarid regions often

Castro, Christopher L.

384

Grand Rapids Community College & Michigan State University LANDSCAPE & LAWN MANAGEMENT PROGRAM  

E-Print Network [OSTI]

­ Landscape Maintenance 2 HRT 214 ­ Landscape and Turfgrass Business Operations 2 PLP 104 ­ Applied PlantGrand Rapids Community College & Michigan State University LANDSCAPE & LAWN MANAGEMENT PROGRAM GRCC an Associate of Applied Arts and Science Degree from GRCC as well as the Landscape & Lawn Management

Isaacs, Rufus

385

Grand Rapids Community College & Michigan State University LANDSCAPE and LAWN MANAGEMENT PROGRAM  

E-Print Network [OSTI]

Landscape Plants II 3 HRT 213 Landscape Maintenance 2 HRT 214 Landscape and Turfgrass Business Operations 2Grand Rapids Community College & Michigan State University LANDSCAPE and LAWN MANAGEMENT PROGRAM MSU Landscape & Lawn Management Certificate MSU Contact: Marcus Duck, Program Coordinator ­ (517) 355

Isaacs, Rufus

386

Impacts of Irrigation on Citrus in the Lower Rio Grande Valley  

E-Print Network [OSTI]

Citrus is an important crop in the Lower Rio Grande Valley, but reduced water supplies in the area mean irrigation must be used. Citrus farmers can use different irrigation methods and practices to get the most from the available water supply....

Enciso, Juan; Sauls, Julian W.; Wiedenfeld, Robert P.; Nelson, Shad D.

2008-07-11T23:59:59.000Z

387

DOMESTIC'S SEPTIC TANKS CONTRIBUTION TO THE POLLUTION OF THE RO GRANDE DE AASCO  

E-Print Network [OSTI]

DOMESTIC'S SEPTIC TANKS CONTRIBUTION TO THE POLLUTION OF THE RÍO GRANDE DE A�ASCO Widaliz Pujols, animal farms, and domestic septic tanks. These pollutant sources are classified as non-point pollutant sources. Crops and domestic's septic tanks are very close to the Añasco River. Crops needs organic

Gilbes, Fernando

388

UMTRA Surface Project management action process document: Final. Revision 2  

SciTech Connect (OSTI)

Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

NONE

1996-06-01T23:59:59.000Z

389

project.m  

E-Print Network [OSTI]

function project(u,w) %last updated 5/9/94 %PROJECT Projecting vector U onto vector W orthogonally. Vectors % U and W can be either a pair of 2D or 3D ...

390

Super Projects (Arkansas)  

Broader source: Energy.gov [DOE]

A 2004 amendment to the state constitution authorizes the state to attract super projects by issuing bonds to fund a project’s infrastructure, limited to 5% of the net general revenues during the...

391

Project Selection - Record Keeping  

E-Print Network [OSTI]

4-H members have many project areas to choose from, depending on where they live. Members should consult with their parents and 4-H leaders when choosing a project. This publication outlines project considerations....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

392

The Boeing Company Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen,Ltd Jump Jump to:Information 'Grand Paris' Project:Beam Jump

393

Final report to the Department of Energy: Green Schools Project DE-FC01-99EE10685. Schools for the 21st century: Transferring the Green Schools experience  

SciTech Connect (OSTI)

This report describes five major activities that the Alliance to Save Energy performed for the years 2000 and 2001 to support and compliment DOE's Energy Smart Schools Partnership. The major tasks under this project were to: (1) Promote the School Efficiency Peer Exchange program for school personnel; (2) develop the Earth Apple Awards program and disseminate the best award-winning ideas; (3) link Green Schools with Rebuilt with at least one metropolitan area such as Philadelphia or Buffalo; (4) support Rebuild/Energy Smart Schools through working at the state level to develop business, state, and local government and through making presentations in support of school efficiency; (5) update the curriculum search originally conducted in 1995.

Harrigan, Merrilee

2002-01-15T23:59:59.000Z

394

Geographic Information System (GIS) Emergency Support for the May 2000 Cerro Grande Wildfire, Los Alamos, New Mexico, USA  

SciTech Connect (OSTI)

In May 2000 the Cerro Grande wildfire swept through Los Alamos, New Mexico, burning approximately 17,400 ha (43,000 acres) and causing evacuation of Los Alamos National Laboratory (LANL) and the communities of Los Alamos and White Rock. An integral part of emergency response during the fire was the use of geographic information system (GIS) technology, which continues to be used in support of post-fire restoration and environmental monitoring. During the fire Laboratory GIS staff and volunteers from other organizations worked to produce maps and provide support for emergency managers, including at an emergency GIS facility in Santa Fe. Subsequent to the fire, Laboratory GIS teams supported the multiagency Burned Area Emergency Rehabilitation (BAER) team to provide GIS data and maps for planning mitigation efforts. The GIS teams continue to help researchers, operations personnel, and managers deal with the tremendous changes caused by the fire. Much of the work is under the auspices of the Cerro Grande Rehabilitation Project (CGRP) to promote recovery from fire damage, improve information exchange, enhance emergency management, and conduct mitigation activities. GIS efforts during the fire provided important lessons about institutional matters, working relationships, and emergency preparedness. These lessons include the importance of (1) an integrated framework for assessing natural and human hazards in a landscape context; (2) a strong GIS capability for emergency response; (3) coordinated emergency plans for GIS operations; (4) a method for employees to report their whereabouts and receive authoritative information during an evacuation; (5) GIS data that are complete, backed-up, and available during an emergency; (6) adaptation of GIS to the circumstances of the emergency; (7) better coordination in the GIS community; (8) better integration of GIS into LANL operations; and (9) a central data warehouse for data and metadata. These lessons are important for planning future directions of GIS at LANL. Growing maturity of GIS is expected to lead to standardization and a better-integrated, more-coordinated approach to data sharing and emergency management at LANL, and within DOE, in accord with the federal government's increasing focus on electronic communication for its organizational and public interactions.

C.R.Mynard; G.N.Keating; P.M.Rich; D.R. Bleakly

2003-05-01T23:59:59.000Z

395

Falls Creek Hydroelectric Project  

SciTech Connect (OSTI)

This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

2007-06-12T23:59:59.000Z

396

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Leafs Enrolled to Date EV Project Chevrolet Volts Enrolled to Date EV Project Smart Electric Drives Enrolled to Date Distance Driven (mi) Phoenix, AZ Metropolitan Area 274...

397

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Leafs Enrolled to Date EV Project Chevrolet Volts Enrolled to Date EV Project Smart Electric Drives Enrolled to Date Distance Driven (mi) Phoenix, AZ Metropolitan Area 259...

398

Project Risk Management:.  

E-Print Network [OSTI]

?? The recent increase in international projects has resulted in higher risk along with difficulties in control and coordination. Effective project management can therefore be… (more)

Koelmeyer, Chris

2013-01-01T23:59:59.000Z

399

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

400

Project BETA Cover Page  

E-Print Network [OSTI]

and Distribution of the Project BETA articles were funded inproduct is discussed in the BETA articles. Western JournalProject BETA: Best practices in Evaluation and Treatment of

Cover Page, Project BETA

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Report Project to date through March 2013 Charging Infrastructure Region Number of EV Project Charging Units Installed To Date Number of Charging Events Performed Electricity...

402

Project Finance and Investments  

Broader source: Energy.gov [DOE]

Plenary III: Project Finance and Investment Project Finance and Investments Chris Cassidy, National Business Renewable Energy Advisor, U.S. Department of Agriculture

403

Clean Coal Projects (Virginia)  

Broader source: Energy.gov [DOE]

This legislation directs the Virginia Air Pollution Control Board to facilitate the construction and implementation of clean coal projects by expediting the permitting process for such projects.

404

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

405

April, 30 2005 Aspen, Colorado Andreas Haungs KASCADE-Grande Collaboration `Physics from the Knee to the Ankle Investigating the 2nd Knee  

E-Print Network [OSTI]

the Knee to the Ankle´ Investigating the 2nd Knee: KASCADE-Grande Andreas Haungs haungs ­ KASCADE-Grande Collaboration `Physics from the Knee to the Ankle´ Cosmic Rays around the knee: What-Grande Collaboration `Physics from the Knee to the Ankle´ Measurements of air showers in the energy range E0 = 100 Te

406

Ultracomputer Research Project  

SciTech Connect (OSTI)

This document presents significant accomplishments made on the Ultracomputer Research Project during CY92.

Gottlieb, A.

1992-10-01T23:59:59.000Z

407

Evaluation of Project Achievements in VOMARE -project.  

E-Print Network [OSTI]

??The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation… (more)

Kokkarinen, Eeva

2011-01-01T23:59:59.000Z

408

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Pollutants? NEPA COMPLIANCE SURVEY Is the project subject to emissions limitations In an Air 0 81 0 Quality Control Region? Impacts If YES, then complete below. Anticipated?...

409

Uranium Mill Tailings Remedial Action Project 1994 environmental report  

SciTech Connect (OSTI)

This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

NONE

1995-08-01T23:59:59.000Z

410

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan National Spherical Torus Experiment (NSTX) Upgrade Project Execution Plan Revision 1 October 6, 2011 Submitted by: R. Strykowsky NSTX Upgrade Project Manager _____________________________ M. Williams Associate Director, PPPL

Princeton Plasma Physics Laboratory

411

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan National Spherical Torus Experiment (NSTX) Upgrade Project Execution Plan Revision 3 October 12, 2012 Administrative Change Submitted by: ______________________________ R. Strykowsky NSTX Upgrade Project Manager Anthony Indelicato

Princeton Plasma Physics Laboratory

412

A simple grand canonical approach to compute the vapor pressure of bulk and finite size systems  

SciTech Connect (OSTI)

In this article we introduce a simple grand canonical screening (GCS) approach to accurately compute vapor pressures from molecular dynamics or Monte Carlo simulations. This procedure entails a screening of chemical potentials using a conventional grand canonical scheme, and therefore it is straightforward to implement for any kind of interface. The scheme is validated against data obtained from Gibbs ensemble simulations for water and argon. Then, it is applied to obtain the vapor pressure of the coarse-grained mW water model, and it is shown that the computed value is in excellent accord with the one formally deduced using statistical thermodynamics arguments. Finally, this methodology is used to calculate the vapor pressure of a water nanodroplet of 94 molecules. Interestingly, the result is in perfect agreement with the one predicted by the Kelvin equation for a homogeneous droplet of that size.

Factorovich, Matías H.; Scherlis, Damián A. [Departamento de Química Inorgánica, Analítica y Química Física/INQUIMAE, Facultad de Ciencias Exactas y Naturales, Universidad de Buenos Aires, Ciudad Universitaria, Pab. II, Buenos Aires C1428EHA (Argentina)] [Departamento de Química Inorgánica, Analítica y Química Física/INQUIMAE, Facultad de Ciencias Exactas y Naturales, Universidad de Buenos Aires, Ciudad Universitaria, Pab. II, Buenos Aires C1428EHA (Argentina); Molinero, Valeria [Department of Chemistry, University of Utah, 315 South 1400 East, Salt Lake City, Utah 84112-0850 (United States)] [Department of Chemistry, University of Utah, 315 South 1400 East, Salt Lake City, Utah 84112-0850 (United States)

2014-02-14T23:59:59.000Z

413

Light colored scalar as messenger of up-quark flavor dynamics in grand unified theories  

SciTech Connect (OSTI)

The measured forward-backward asymmetry in the tt production at the Tevatron might be explained by the additional exchange of a colored weak singlet scalar. Such state appears in some of the grand unified theories, and its interactions with the up-quarks are purely antisymmetric in flavor space. We systematically investigate the resulting impact on charm and top quark physics. The constraints on the relevant Yukawa couplings come from the experimentally measured observables related to D{sup 0}-D{sup 0} oscillations, as well as dijet and single-top production measurements at the Tevatron. After fully constraining the relevant Yukawa couplings, we predict possible signatures of this model in rare top quark decays. In a class of grand unified models we demonstrate how the obtained information enables to constrain the Yukawa couplings of the up-quarks at very high energy scale.

Dorsner, Ilja [Department of Physics, University of Sarajevo, Zmaja od Bosne 33-35, 71000 Sarajevo (Bosnia and Herzegowina); Fajfer, Svjetlana [Department of Physics, University of Ljubljana, Jadranska 19, 1000 Ljubljana (Slovenia); J. Stefan Institute, Jamova 39, P.O. Box 3000, 1001 Ljubljana (Slovenia); Kamenik, Jernej F.; Kosnik, Nejc [J. Stefan Institute, Jamova 39, P.O. Box 3000, 1001 Ljubljana (Slovenia)

2010-11-01T23:59:59.000Z

414

The ending of an era: After more than 10 years, the Rio Grande Basin Initiative concludes  

E-Print Network [OSTI]

: #29;) irrigation district studies; #31;) irrigation education and training; #28;) institutional incentives for e#23;cient water use; #25;) on-farm irrigation system management; #26;) urban water conservation; #14;) environment, ecology and water... and predicted population growth will continue to strain limited water supplies both for agricultural irrigation and urban water consumption. In #31;#30;#30;#29; the E#28;cient Irrigation for Water Conservation in the Rio Grande Basin initiative, also known...

Kalisek, Danielle

2013-01-01T23:59:59.000Z

415

Investigation of techniques for improvement of seasonal streamflow forecasts in the Upper Rio Grande  

E-Print Network [OSTI]

LIST OF FIGURES Page Figure 2-1. Maps of the Upper Rio Grande basin showing the gauging sites used in this study: (a) NWS temperature and precipitation stations and snowcourse sites (left); (b) USGS streamflow gauging stations and their drainage...-7. Map of composite average monthly temperature residuals at each station from October through September for El Ni?o (solid), neutral (dotted), La Ni?a (dashed) years??????????... 29 Figure 2-8. Map of composite average monthly total precipitation...

Lee, Song-Weon

2005-11-01T23:59:59.000Z

416

Rare, Threatened and Endangered Species of the Rio Grande/ Rio Bravo Basin: A Bibliography  

E-Print Network [OSTI]

sur de Texas y de México se considera uno de los "últimos grandes hábitats en Norteamérica debido a sus recursos biológicos únicos (Fulbright y Bryant 2002). A través del tiempo, las plantas y los animales nativos o autóctonos de las regiones.../Río Bravo ha mantenido un valor biológico significativo , gran parte de esta ha sido altamente degradada al compararse con su condición de hace 50 a 100 años (Ricketts et al 1999). Los impactos humanos producidos por la desviación del agua, los...

Wilkins, Neal; Gil, Karine

417

Aspects of the natural history of freshwater turtles within the lower Rio Grande Valley of Texas  

E-Print Network [OSTI]

) reported on food preferences of captives from Texas. Mahmoud (1960, 1967, 1968, 1969) studied the ecology of this species in Oklahoma. THE STUDY AREA This study was conducted during the months of June-November, 1976, in the lower Rio Grande Valley (Rio... is found from Indiana south through Alabama, western Georgia, and the Florida Panhandle to the Gulf of Mexico; west through Missouri, Kansas, Oklahoma, and Texas into eastern New Nexico and northeastern Mexico (Conant, 1975). This form was caught in all...

Grosmaire, Eric Kevin

2012-06-07T23:59:59.000Z

418

INGENIERIA DE TRAFICO EN LINEA EN REDES MPLS APLICANDO LA TEORIA DE GRANDES DESVIACIONES  

E-Print Network [OSTI]

INGENIER´IA DE TR´AFICO EN L´INEA EN REDES MPLS APLICANDO LA TEOR´IA DE GRANDES DESVIACIONES Por´IA EN INGENIER´IA EL´ECTRICA de la UNIVERSIDAD DE LA REP´UBLICA MONTEVIDEO, URUGUAY 2003 c Copyright firmantes certifican haber le´ido el presente documento y recomiendan a la Facultad de Ingenier´ia la

419

Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay  

SciTech Connect (OSTI)

This report documents the third year of a four-year study to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee salmon (Oncorhynchus nerka) and rainbow trout (O. mykiss) in the forebay to the third powerplant at Grand Coulee Dam. This work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes).

Simmons, Mary Ann; Johnson, Robert L.; McKinstry, Craig A.; Simmons, Carver S.; Cook, Chris B.; Brown, Richard S.; Tano, Daniel K.; Thorsten, Susan L.; Faber, Derrek M.; Lecaire, Richard; Francis, Stephen

2004-01-01T23:59:59.000Z

420

Evolution of Irrigation Districts and Operating Institutions: Texas, Lower Rio Grande Valley  

E-Print Network [OSTI]

of Agriculture, under Agreement Numbers 2001- 45049-01149 and 2003-34461-13278. About the Authors Megan J. Stubbs M. Edward Rister Ronald D. Lacewell John R. Ellis Allen W. Sturdivant John R. C. Robinson Linda Fernandez The authors... supply entities, laws, and agreements. This chapter describes the river, the history of settlement, and the history of development in the region. The first section briefly introduces the Rio Grande, describing the river’s course, drainage...

Fernandez, Linda; Robinson, John R.C.; Lacewell, Ronald D.; Rister, M. Edward; Ellis, John R.; Sturdivant, Allen W.; Stubbs, Megan J.

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

International cooperation between the United States and Mexico: addressing water quality of the Lower Rio Grande  

E-Print Network [OSTI]

concerns, and later concentrates on the United States/Mexico border and transboundary issues in the Rio Grande Basin. Policy Building and Sttstainable Development Ascher and Healy (1990), focusing their analysis on third world nations, approach... provides insight into pitfalls of policy development in third world nations. The 19 pitfalls often are apparent in natural resource depletion, environmental degradation, and inefficiencies in aiding populations, usually poor, who were to benefit from...

Crouch, Kellie Gene

1997-01-01T23:59:59.000Z

422

Plants of Ornamental Value for the Rio Grande Valley of Texas.  

E-Print Network [OSTI]

foliage with golden yellow stems. Suckering freely at the base, it produces a bushy effect. This palm is very tender to cold. Gocos australis. Dwarf Blue Palm, Australian Palm, Pindo Palm. A rather dwarf palm which produces graceful, recurved, bluegreen... trunk and graceful, feathery, dark green leaves (Fig- ure 3). Although somewhat tender to cold and occasionally chlorotic. this palm can be grown successfully in the Lower Rio Grande Valley in sheltered locations. Figure 2. Dwarf Blue Coconut...

Friend, W. H. (William Heartsill)

1942-01-01T23:59:59.000Z

423

Senior projectS corporate Sponsored  

E-Print Network [OSTI]

--Professor, Computer Engineering | http://users.soe.ucsc. edu/~larrabee/Site/Professor_Tracy_Larrabee.html Charlie McSenior projectS program corporate Sponsored Partner's Day May 31, 2012 Baskin School of Engineering earning their engineering degree and fulfilling this capstone design sequence. Our students who have

Stuart, Josh

424

Project Description: page 1 Project Description  

E-Print Network [OSTI]

Project Description: page 1 Project Description I. Introduction: Josephson junction networks Over the past 25 years, superconducting Josephson junctions have gradually become one of the major topics standards. Our research uses Josephson junctions as model systems for problems in nonlinear and neural

Segall, Ken

425

Livingston Campus Geothermal Project The Project  

E-Print Network [OSTI]

Livingston Campus Geothermal Project The Project: Geothermal power is a cost effective, reliable is a Closed Loop Geothermal System involving the removal and storage of approximately four feet of dirt from the entire Geothermal Field and the boring of 321 vertical holes reaching a depth of 500 feet. These holes

Delgado, Mauricio

426

National Uranium Resource Evaluation. Bibliographic index of Grand Junction office uranium reports  

SciTech Connect (OSTI)

In October 1978, Mesa College entered into subcontract with Bendix Field Engineering Corporation (BFEC) to prepare a bibliographic index of the uranium raw materials reports issued by the Grand Junction Office of the US Department of Energy (DOE). Bendix, prime contractor to the Grand Junction Office, operates the Technical Library at the DOE facility. Since the early 1950s, approximately 2700 reports have been issued by the Grand Junction Office. These reports were the results of uranium investigations conducted by federal agencies and their subcontractors. The majority of the reports cover geology, mineralogy, and metallurgy of uranium and/or thorium. No single, complete list of these reports existed. The purpose of this subcontract was to compile a comprehensive index to these reports. The Mesa College geology faculty worked with the BFEC and DOE staffs to develop the format for the index. Undergraduate geology students from Mesa compiled a master record sheet for each report. All reports issued up to January 1, 1979 were included in the bibliography. The bibliography is in preliminary, unedited form. It is being open-filed at this time, on microfiche, to make the information available to the public on a timely basis. The bibliography is divided into a master record list arranged in alpha-numeric order by report identification number, with separate indices arranged by title, author, state and county, 1/sup 0/ x 2/sup 0/ NTMS quadrangle, key words, and exploration area.

Johnson, J.B.

1981-05-01T23:59:59.000Z

427

EIS-0126: Remedial Actions at the Former Climax Uranium Company Uranium Mill Site, Grand Junction, Mesa County, Colorado  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy developed this EIS to assess the environmental impacts of remediating the residual radioactive materials left from the inactive uranium processing site and associated properties located in Grand Junction, Colorado.

428

Economic impact study of the Uranium Mill Tailings Remedial Action project in Colorado: Colorado state fiscal year 1995  

SciTech Connect (OSTI)

This Colorado economic impact study summarizes employment and economic benefits to the state from activities associated with the Uranium Mill Tailings Remedial Action (UMTRA) Project during Colorado state fiscal year (FY) 1995 (1 July 1994 through 30 June 1995). To capture employment information, a questionnaire was distributed to subcontractor employees at the active UMTRA Project sites of Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock, Colorado. Economic data were requested from the Remedial Action Contractor (RAC), the Technical Assistance Contractor (TAC) and the US Department of Energy (DOE). The most significant benefits associated with the UMTRA Project in Colorado are summarized.

NONE

1995-12-01T23:59:59.000Z

429

Economies of Size in Municipal Water-Treatment Technologies: A Texas Lower Rio Grande Valley Case Study  

E-Print Network [OSTI]

COLLEGE OF AGRICULTURE AND LIFE SCIENCES TR-367 2010 Economies of Size in Municipal Water-Treatment Technologies: A Texas Lower Rio Grande Valley Case Study By: Christopher N. Boyer1, M. Edward Rister2... Resources Institute Technical Report No. 367 Texas A&M University System College Station, Texas 77843-2118 July 2010 Economies of Size in Municipal Water-Treatment Technologies: A Texas Lower Rio Grande Valley Case Study July 2010 Texas Water...

Boyer, Christopher N.; Rister, M. Edward; Rogers, Callie S.; Sturdivant, Allen W.; Lacewell, Ronald D.; Browning, Charles Jr.; Elium III, James R.; Seawright, Emily K.

430

Economic implications of alternative cotton production strategies in the lower Rio Grande Valley of Texas, 1973-78  

E-Print Network [OSTI]

ECONOMIC IMPLICATIONS OF ALTERNATIVE COTTON PRODUCTION STRATEGIES IN THE LOWER RIO GRANDE VALLEY OF TEKAS, 1973-78 A Thesis by RAJ KUMAR SHAUNAK Submitted to the Graduate College of Texas A&M University in partial fulfillment... of the requirement for the degree of MASTER OF SCIENCE May 1982 Major Subject: Agricultural Economics ECONOMIC IMPLICATIONS OF ALTERNATIVE COTTON PRODUCTION STRATEGIES IN THE LOWER RIO GRANDE VALLEY OF TEXAS, 1973-7B A Thesis RAJ KUMAR SHAUNAK Approved...

Shaunak, Raj Kumar

1982-01-01T23:59:59.000Z

431

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90%...

432

Contract/Project Management  

Energy Savers [EERE]

on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre-...

433

Rank Project Name Directorate,  

E-Print Network [OSTI]

Rank Project Name Directorate, Dept/Div and POC Cost Savings Payback (Years) Waste Reduction 1 NATIONAL LABORATORY FY02 Funded Pollution Prevention Projects 0.4 Years (~5 months) #12;

434

The 4-H Project  

E-Print Network [OSTI]

As a 4-H volunteer, you will find that projects are useful tools for teaching a wide variety of skills to young people. This publication will help you plan and evaluate 4-H learning projects....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

435

Information Technology Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

2012-12-03T23:59:59.000Z

436

Planning the Project Meeting  

E-Print Network [OSTI]

Project group meetings must be planned well in advance. Members should be involved in completing some type of work before the next meeting. This helps the leader plan the next project meeting and makes efficient use of time....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

437

Information Technology Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1, dated 1-16-2013, cancels DOE O 415.1.

2012-12-03T23:59:59.000Z

438

Page 1 of 26 INDEPENDENT PROJECT  

E-Print Network [OSTI]

Page 1 of 26 INDEPENDENT PROJECT EVALUATION PROJECT NAME: HIVE PROOF-OF- CONCEPT PROJECT PROJECT ............................................................................................................................................3 The Project..............................................................................................................................................3 Project Objectives and Achievements

Evans, Paul

439

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan ii Table of Contents 1 ..............................................................................................................................1 1.2.1 DOE-approved project documents

Princeton Plasma Physics Laboratory

440

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record/schedule baseline updates #12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan ii ..............................................................................................................................1 1.2.1 DOE-approved project documents

Princeton Plasma Physics Laboratory

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

UMTRA Ground Water Project  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofofOxford SiteToledoSampling at the GrandSr:s I ] t1Verification

442

UMTRA Ground Water Project  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofofOxford SiteToledoSampling at the GrandSr:s I ]

443

WIPP Projects Interative Map  

Broader source: Energy.gov [DOE]

View WIPP Projects in a larger map. To report corrections, please email WeatherizationInnovation@ee.doe.gov.

444

GHPsRUS Project  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

Battocletti, Liz

445

GHPsRUS Project  

SciTech Connect (OSTI)

The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

Battocletti, Liz

2013-07-09T23:59:59.000Z

446

Project: BELLA Bldg. #: 71  

E-Print Network [OSTI]

: BEVATRON Bldg. #: 51 Affected Area: Lot I (6) Lower Lot (52) Dates: 6/2009 - 11/2011 Project: Seismic PhaseProject: BELLA Bldg. #: 71 Affected Area: Lot M-1(12) B81 (18) Dates: 10/2010 ­ 10/2011 Project II Bldg. #: 74 Affected Area: U1 (50) U3 (21) Dates: 10/2009 ­ 4/2012 Project: Old Town Demo Bldg

447

Fundamental Aeronautics Hypersonics Project  

E-Print Network [OSTI]

Fundamental Aeronautics Hypersonics Project Reference Document Principal Investigator: James and detailed content of a comprehensive Fundamental Aeronautics Hypersonics research project. It contains) Hypersonic Project is based on the fact that all access to earth or planetary orbit, and all entry into earth

448

Project Website Information Architecture  

E-Print Network [OSTI]

Project Website Information Architecture Overview Purpose: To describe up front what your initiative/project does. This section does not need to literally be called "Overview;" you can come up with anther suitable title that is more specific to your project. Examples of what to include: Information

449

Project Scheduling (3) Corequisite  

E-Print Network [OSTI]

) CMGT 111 Construction Materials & Methods Lab (1) CMGT 460 Project Cost Controls (3) FA SP CMGT 320 FASYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro) CMGT 475 Construction Project Management (3) MATH 108 College Algebra (4) Construction Elective

Barrash, Warren

450

Project Scheduling (3) Corequisite  

E-Print Network [OSTI]

460 Project Cost Controls (3) FA SP FA CE 210/211 Surveying & Lab (3) CMGT 410 Concrete FormworkSYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro Construction Project Management (3) MATH 108 College Algebra (4) MGMT 301 Leadership Skills (3) ENGL 101

Barrash, Warren

451

New Project Opportunities  

E-Print Network [OSTI]

/year. Most projects will be sponsored by between four and ten companies. The cost of participation may changeNew Project Opportunities PIMS: Porphyry Indicator Minerals The characteristics and relative, the next phase of this project has started and MDRU are looking for industry partners. Exploring Lithocaps

Michelson, David G.

452

Kansas Advanced Semiconductor Project  

SciTech Connect (OSTI)

KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

2007-09-21T23:59:59.000Z

453

Product Guide Project Standard and Project Professional  

E-Print Network [OSTI]

................................................................................................................................................................6 Manage Projects and Programs, or other intellectual property that are the subject matter of this document. #12;Table of Contents .......................................................................................................9 Make It Yours ­ Personalize the Ribbon

Narasayya, Vivek

454

Project Overload in Project Based Organizations - Causes, Symptoms and Effects.  

E-Print Network [OSTI]

?? This study investigates the matter of project overload which project members have to face in project based organizations. The thesis is based on 13… (more)

Hochdorfer, Tobias

2007-01-01T23:59:59.000Z

455

Grand Challenges  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky LearningGet AssistanceCatalytic SitesEmployee,

456

Renewable Energy Project Refinement Webinar  

Broader source: Energy.gov [DOE]

Attendees will become familiar with the three components of project refinement: project financing strategies, off-taker agreements, and vendor selection. Project refinement obstacles, particularly...

457

RENOTER Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

RENOTER Project RENOTER Project Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE...

458

Great Plains Wind Energy Transmission Development Project  

SciTech Connect (OSTI)

In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the EERC, in collaboration with Meridian Environmental Services, developed and demonstrated the efficacy of a wind energy forecasting system for use in scheduling energy output from wind farms for a regional electrical generation and transmission utility. With the increased interest at the time of project award in the production of hydrogen as a critical future energy source, many viewed hydrogen produced from wind-generated electricity as an attractive option. In addition, many of the hydrogen production-related concepts involve utilization of energy resources without the need for additional electrical transmission. For this reason, under Task 4, the EERC provided a summary of end uses for hydrogen in the region and focused on one end product in particular (fertilizer), including several process options and related economic analyses.

Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

2012-06-09T23:59:59.000Z

459

BEACON SOLAR ENERGY PROJECT (08-AFC-2) Project Title: Beacon Solar Energy Project (Beacon)  

E-Print Network [OSTI]

BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Project Title: Beacon Solar Energy Project and operate the Beacon Solar Energy Project (Beacon). Location: The project is located in eastern Kern County;BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Licensing: The Beacon project would have a nominal

460

National Compact Stellarator Experiment Project Closeout Report PROJECT CLOSEOUT REPORT  

E-Print Network [OSTI]

National Compact Stellarator Experiment Project Closeout Report i PROJECT CLOSEOUT REPORT NATIONAL of Science Princeton Plasma Physics Laboratory Oak Ridge National Laboratory #12;National Compact Stellarator Experiment Project Closeout Report PROJECT CLOSEOUT REPORT NATIONAL COMPACT STELLARATOR EXPERIMENT (NCSX

Princeton Plasma Physics Laboratory

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment  

SciTech Connect (OSTI)

The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

Not Available

1994-02-01T23:59:59.000Z

462

Dynamic characterization and damage detection in the I-40 bridge over the Rio Grande  

SciTech Connect (OSTI)

In the 1960`s and 1970`s over 2500 bridges were built in the U.S. with a design similar to those on Interstate 40 over the Rio Grande in Albuquerque, New Mexico. These bridges were built without structural redundancy and typically have only two plate girders carrying the entire dead and live loads. Failure of either girder is assumed to produce catastrophic failure of the bridge, hence these bridges are referred to as fracture-critical bridges. The Federal Highway Administration (FHWA) and the National Science Foundation (NSF) have provided funds to New Mexico State University (NMSU) through the New Mexico State Highway and Transportation Department (NMSH&TD) and The Alliance For Transportation Research (ATR) for evaluation and testing of the existing fracture critical bridges over the Rio Grande. Because the 1-40 bridges over the Rio Grande were to be razed during the summer of 1993, the investigators were able to introduce simulated fatigue cracks, similar to those observed in the field, into the structure in order to test various damage identification methods and to observe the changes in load paths through the structure caused by the cracking. To support this research effort, NMSU contracted Los Alamos National Laboratory (LANL) to perform experimental modal analyses, and to develop experimentally verified numerical models of the bridge. Scientists from the LANL`s Condensed Matter and Thermal Physics Group (P-10) applied state-of-the-art sensors and data acquisition software to the modal tests. Engineers from the LANL`s Advanced Engineering Technology Group (MEE-13) conducted ambient and forced vibration tests to verify detailed and simplified finite element models of the bridge. Forced vibration testing was done in conjunction with engineers from Sandia National Laboratory (SNL) who provided and operated a hydraulic shaker.

Farrar, C.R.; Baker, W.E.; Bell, T.M.; Cone, K.M.; Darling, T.W.; Duffey, T.A.; Eklund, A.; Migliori, A.

1994-06-01T23:59:59.000Z

463

Large Angle MSW Solution in Grand Unified Theories with SU(3) X U(1) Horizontal Symmetry  

E-Print Network [OSTI]

We construct a model with a SU(3) X U(1) horizontal symmetry in the context of Grand Unified Theories. In our models, the bi-maximal lepton mixing and suitable neutrino masses for the large angle MSW solution are obtained without any fine-tuning due to the spontaneously broken SU(3)_H symmetry. The three generations of quarks and leptons are unified as members of the SU(3)_H fundamental representation, and the U(1)_H charge gives the origin of the fermion mass hierarchy and mixing angles. We present two explicit examples of SU(5)_GUT and SO(10)_GUT models, in which the Yukawa structures are given successfully.

Ryuichiro Kitano; Yukihiro Mimura

2000-09-13T23:59:59.000Z

464

Communication: Reduced density matrices in molecular systems: Grand-canonical electron states  

SciTech Connect (OSTI)

Grand-canonical like descriptions of many electron atomic and molecular open systems which are characterized by a non-integer number of electrons are presented. Their associated reduced density matrices (RDMs) are obtained by introducing the contracting mapping for this type of distributions. It is shown that there is loss of information when connecting RDMs of different order by partial contractions. The energy convexity property of these systems simplifies the description. Consequently, this formulation opens the possibility to a new look for chemical descriptors such as chemical potential and reactivity among others. Examples are presented to discuss the theoretical aspects of this work.

Bochicchio, Roberto C., E-mail: rboc@df.uba.ar [Departamento de Física, Facultad de Ciencias Exactas y Naturales, Universidad de Buenos Aires and IFIBA, CONICET, Ciudad Universitaria, 1428 Buenos Aires (Argentina); Miranda-Quintana, Ramón A. [Laboratory of Computational and Theoretical Chemistry, Faculty of Chemistry, University of Havana, Zapata e G y Mazón, 10400 Havana (Cuba)] [Laboratory of Computational and Theoretical Chemistry, Faculty of Chemistry, University of Havana, Zapata e G y Mazón, 10400 Havana (Cuba); Rial, Diego [Departamento de Matemática, Facultad de Ciencias Exactas y Naturales, Universidad de Buenos Aires and IMAS, CONICET, Ciudad Universitaria, 1428 Buenos Aires (Argentina)] [Departamento de Matemática, Facultad de Ciencias Exactas y Naturales, Universidad de Buenos Aires and IMAS, CONICET, Ciudad Universitaria, 1428 Buenos Aires (Argentina)

2013-11-21T23:59:59.000Z

465

Characteristics of roosts of the Rio Grande turkey (Meleagris gallopavo intermedia) in South Texas  

E-Print Network [OSTI]

4 5 6 7 8 9 0 0 1, 500 5, 808 0 5, 016 7, 392 0 117 4, 118 528 1, 056 6, 336 4, 224 1, 584 Average 2, 204 2, 974 30 and one as forb habitat categories, On Encino all six were forb-grass. At some winter roosts roads werc...CHARACTERISTICS OF ROOSTS OF THE RIO GRANDE TURKEY (MELEAGRIS GALLOPAVO INTERMEDIA) IN SOUTH TEXAS A Thesis by Harry Hayden Haucke Submitted to the Graduate College of Texas A6R University in parti@1 fulfillment of the requirement...

Haucke, Harry Hayden

1974-01-01T23:59:59.000Z

466

California Red Scale and its Control in the Lower Rio Grande Valley of Texas.  

E-Print Network [OSTI]

- - -: '+ ,,,:> un ,e , California Red Scale and Its Control in the Lower Rio Grande Valley of Texas GRICULTURAL AND MECHANICAL COLLEGE OF TEXAS T. 0. WALTON, President STATION STAFFf. Ldministration : Veterinary Science : A. B. Conner, M. S., Director *M... W. R. Horlacher. Ph. D.. Genetics J. H. Knox, M. S., Animal Husbandry A. L. Darnell, M. A., Dairy Husbandry *Dean School of Veterinary Medicine. fAs of March 1. 1.932. **In cooperation with U. S. Department of Agr~culture. ell ec whic scale...

Clark, S. W. (Sherman Wood); Friend, W. H. (William Heartsill)

1932-01-01T23:59:59.000Z

467

Population Dynamics of Plain Chachalacas in the Lower Rio Grande Valley  

E-Print Network [OSTI]

. The biotic provinces of Texas. Texas Journal of Science 2:93?117. Hooge, B. N., and B. Eichenlaub. 1999. Animal movement extension to ArcView, version 1.1. Alaska Biological Center, U.S. Geological Survey, Anchorage, Alaska, USA. Jahrsdoefer, S. E.... Silvy, R. R. Lopez, B. E. Toole, R. S. Jones, and S. J. DeMaso. Breeding and non-breeding survival of lesser prairie-chickens in Texas. Wildlife Biology 15:89?96. Marion, W. R. 1974. Ecology of the plain chachalaca in the Lower Rio Grande Valley...

Gandaria, Adan G.

2011-02-22T23:59:59.000Z

468

The impact of man upon herpetological communities in the lower Rio Grande Valley, Texas  

E-Print Network [OSTI]

. APPENDIX C VITA 1X 10 j 7 30 60 72 73 81 87 94 96 va1. a LIST OF TABLES TABLE Page Major levels of land classification system based on remote sensing techniques employing high altitude aerial photographs (from Anderson, et al. 1976) 19... Land use and land cover classification system (modified from Anderson, et al. 1976). . . . . . . 20 Land use in Cameron County (in hectares) (from data compiled by the lower Rio Grande Development Council, 1973). 21 Land use in Hidalgo and Willacy...

Thornton, Okla Weldon

1977-01-01T23:59:59.000Z

469

Watermelon marketing in Texas with emphasis on the Rio Grande Plain  

E-Print Network [OSTI]

L(sng&y "SM COLLEGE pF &Erie HLTER&IDN HkRHETING IN TBXRS WITH EHPHLSZS QN THE RID SHARK FLAIN i Thesis eaiHLZS Wtu, IRH HRONN ewe Snhnitted to ths Graduate School ef ths lgriaultural and Neehanieal CelIsgo ef Tones in partial fulfillnsnt ef... and Partners With Landssnsrs hp Countias in the Ric Grande Pining 1958' ~ ~ ~ i i ~ ~ ~ ~ ~ ~ ~ ~ ~ i . ~ ~ ~ ~ ~ 17 5. Percent ef Tc~ Molcns Bruised Intornallp and Index of Bruising When Using Ncr?al and Careful Handling Methods. . . 32 6. Washy Ship...

Brown, Charles William

1958-01-01T23:59:59.000Z

470

The Control of Fire Ants in the Lower Rio Grande Valley  

E-Print Network [OSTI]

. The fire ant does severe damage to young citrus trees in the Lower Rio Grande Valley. The control of this pest is one of the major factors in the development of a citrus grove in this region. Calcium cyanide, applied to the ant nests, has given satis...- factory control of these insects. Paints and washes incor- porating crude carbolic acid, creosote, or creolin compounds are not recommended for application to the citrus tree. Poisoned baits, using arsenicals as the poison ingredient, have not given...

Clark, S. W. (Sherman Wood)

1931-01-01T23:59:59.000Z

471

U.S. Department of Energy at Grand Junction 2003 Annual Inspection⎯Monticello, Utah  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou$0.C.Green River,The Secretaryat Grand Junction 2003

472

Grand Challenges in Energy by Secretary Steven Chu | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorge Waldmann GeorgeLogging Systems (December 1983) | Department ofGrand

473

SO(10) Grand Unification in M theory on a G2 manifold  

E-Print Network [OSTI]

We consider Grand Unified Theories based on $SO(10)$ which originate from string/$M$ theory on $G_2$ manifolds or Calabi-Yau spaces with discrete symmetries. In this framework we are naturally led to a novel solution of the doublet-triplet splitting problem previously considered by Dvali which involves an extra vector-like Standard Model family and light, but weakly coupled colour triplets. These additional states are predicted to be accessible at the LHC and also induce R-parity violation. Gauge coupling unification occurs with a larger GUT coupling.

Acharya, Bobby S; Romao, Miguel Crispim; King, Stephen F; Pongkitivanichkul, Chakrit

2015-01-01T23:59:59.000Z

474

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record 10/12/2012 Update to WBS Level 2 Threshold (top of page 20), Change DOE Federal Project Director and Deputy Federal Project Director. Various OBS changes. #12;NSTX Upgrade Project Execution Plan NSTX

Princeton Plasma Physics Laboratory

475

The CHPRC Columbia River Protection Project Quality Assurance Project Plan  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

Fix, N. J.

2008-11-30T23:59:59.000Z

476

Battleground Energy Recovery Project  

SciTech Connect (OSTI)

In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and ï?· Create a Showcase Waste Heat Recovery Demonstration Project.

Daniel Bullock

2011-12-31T23:59:59.000Z

477

Operational Waste Volume Projection  

SciTech Connect (OSTI)

Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

STRODE, J.N.

2000-08-28T23:59:59.000Z

478

Operational waste volume projection  

SciTech Connect (OSTI)

Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June 1996.

Koreski, G.M.

1996-09-20T23:59:59.000Z

479

Investor Confidence Project  

E-Print Network [OSTI]

projects (under $1MM), Lighter engineering requirements – V1 Released September 2013 • Targeted Commercial – Single Measure or Non-Interactive Retrofits – Release Date Dec 2013 • Multifamily – Release Q1 2014 • Quality Assurance Protocol – Currently in BETA...Environmental Defense Fund’s Investor Confidence Project Delivering Investment Quality Energy Efficiency to Market ESL-KT-13-12-38 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Investor Confidence Project...

Golden, M.

2013-01-01T23:59:59.000Z

480

Project Finance Case Studies  

Broader source: Energy.gov [DOE]

Presentation covers the Project Finance Case Studies and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

Note: This page contains sample records for the topic "rebuild project grand" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Prison Solar Project  

Broader source: Energy.gov [DOE]

Presentation covers the Prison Solar Project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

482

Recovery Act Project Stories  

Broader source: Energy.gov [DOE]

Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies.

483

Barstow Wind Turbine Project  

Broader source: Energy.gov [DOE]

Presentation covers the Barstow Wind Turbine project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

484

TThe {\\sc Majorana} Project  

E-Print Network [OSTI]

The {\\sc Majorana} Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

The MAJORANA collaboration

2009-10-23T23:59:59.000Z

485

Dispersion Modeling Project  

Broader source: Energy.gov (indexed) [DOE]

Dispersion Modeling Project Nuclear & Criticality Safety Engineering Andrew Vincent Germantown, MD DOE Workshop Savannah River Nuclear Solutions, LLC June, 2012 SRNS-...

486

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Greater Seattle and Olympia Metropolitan Areas Vehicle enrollment numbers refer to the EV Project only. Numbers do not reflect total regional or national vehicles sales or...

487

Our Project Regional, community,  

E-Print Network [OSTI]

City departments -City Engineering and Traffic Engineering Public engagement early in project process modes and all users See.Safe.Smart.Rochester campaign to decrease modal conflict Connection

Minnesota, University of

488

2015 Technology Innovation Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for RTU and Lighting Retrofits Energy Efficiency TIP 140: Energy Efficiency Emerging Technology Assessment and Demonstration Projects TIP 261: Determining and Improving the...

489

The MAJORANA project  

SciTech Connect (OSTI)

The Majorana Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

Elliott, Steven R [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

490

Project Team Participants Summary  

E-Print Network [OSTI]

-sponsored by Information, Society & Culture) Energy--7 project teams 15 Schools and Institutes Represented Trinity College-Year Seminar: Mapping and Modeling Early Modern Venice #12;

Ferrari, Silvia

491

NAESB BPS ATC Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

By Phone * 10114 NAESB BPS ATC Project Kick Off * 107 - 10814 NAESB BPS - MISO (Carmel, IN) * 112515 - NAESB BPS Conference Call * 12215 - NAESB BPS Conference...

492

PROJECT PLANNING TEMPLATE  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

on public affairs efforts, which includes public information activities, press and media services, DOE home-page content, speaking engagements, special projects, internal...

493

Gravity Train Project  

E-Print Network [OSTI]

Dec 7, 2013 ... Gravity Train Project. Same page in Romanian, Polish, and in French. Let us drill a straight tunnel from West Lafayette, IN to Paris, France:.

494

Mascoma: Frontier Biorefinery Project  

Broader source: Energy.gov [DOE]

This project involves the construction and operation of a biorefinery that produces ethanol and other co-products from cellulosic materials through advanced consolidated bioprocessing.

495

Project Description Executive Summary Report  

E-Print Network [OSTI]

$Total Project Cost: 1,000,000Auxillary Enterprises Balances $ 9,400,000Revenue Financing System Bonds $ 1Project Description Executive Summary Report Project Information Project Budget Project Funding 302-680 Parking Structure Phase I This project consists of a 750 space parking garage of approximately 251

O'Toole, Alice J.

496

MASTER OF SCIENCE Enterprise Project  

E-Print Network [OSTI]

MASTER OF SCIENCE Enterprise Project Management PROJECT YOUR FUTURE #12;Stevens Project Management Legacy Master of Science in Enterprise Project Management At Stevens, we understand the value of project. The Master of Science in Enterprise Project Management (MS-EPM) is a 36-credit degree that goes beyond

Yang, Eui-Hyeok

497

UMTRA Project water sampling and analysis plan, Canonsburg, Pennsylvania. Revision 1  

SciTech Connect (OSTI)

Surface remedial action was completed at the US Department of Energy (DOE) Canonsburg and Burrell Uranium Mill Tailings Remedial Action (UMTRA) Project sites in southwestern Pennsylvania in 1985 and 1987, respectively. The Burrell disposal site, included in the UMTRA Project as a vicinity property, was remediated in conjunction with the remedial action at Canonsburg. On 27 May 1994, the Nuclear Regulatory Commission (NRC) accepted the DOE final Long-Term Surveillance Plan (LTSP) (DOE, 1993) for Burrell thus establishing the site under the general license in 10 CFR {section}40.27 (1994). In accordance with the DOE guidance document for long-term surveillance (DOE, 1995), all NRC/DOE interaction on the Burrell site`s long-term care now is conducted with the DOE Grand Junction Projects Office in Grand Junction, Colorado, and is no longer the responsibility of the DOE UMTRA Project Team in Albuquerque, New Mexico. Therefore, the planned sampling activities described in this water sampling and analysis plan (WSAP) are limited to the Canonsburg site. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for routine monitoring at the Canonsburg site for calendar years 1995 and 1996. Currently, the analytical data further the site characterization and demonstrate that the disposal cell`s initial performance is in accordance with design requirements.

NONE

1995-09-01T23:59:59.000Z

498

River Protection Project (RPP) Project Management Plan  

SciTech Connect (OSTI)

The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

NAVARRO, J.E.

2001-03-07T23:59:59.000Z

499

Project Year Spring 2009  

E-Print Network [OSTI]

Project Year Spring 2009 Project Title A Database of Film and Media History and Aesthetics Part 2 experience with colleagues, they were eager to participate in expanding the database to include clips or they simply don't have the time, or both. Solution: The development of a user-friendly database of clips would

Gray, Jeffrey J.

500

The Home Microbiome Project  

SciTech Connect (OSTI)

The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

Gilbert, Jack

2014-08-25T23:59:59.000Z