Powered by Deep Web Technologies
Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

REDD+ Country Readiness Preparation Proposals | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » REDD+ Country Readiness Preparation Proposals Jump to: navigation, search Tool Summary LAUNCH TOOL Name: REDD+ Country Readiness Preparation Proposals Agency/Company /Organization: World Resources Institute Focus Area: Forestry Topics: Implementation, Policies/deployment programs, Pathways analysis Resource Type: Publications, Guide/manual Website: www.wri.org/publication/getting-ready Country: Democratic Republic of Congo, Ghana, Guyana, Indonesia, Madagascar, Mexico, Suriname, Panama Middle Africa, Western Africa, South America, South-Eastern Asia, Eastern Africa, Central America, South America, Central America

2

PROPOSAL PREPARATION INSTRUCTIONS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the escalation factors used for each fiscal year, the source of the proposed escalation rates, and the rationale as to why the proposed escalation rates are reasonable. (l)...

3

Are We Ready to Propose Guidelines for Health-Based Ventilation?  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Are We Ready to Propose Guidelines for Health-Based Ventilation? Are We Ready to Propose Guidelines for Health-Based Ventilation? Speaker(s): Pawel Wargocki Date: October 14, 2013 - 12:00pm - 1:00pm Location: 90-3122 Seminar Host/Point of Contact: Mark Mendell Guidelines for health-based ventilation in Europe are proposed. They follow the premise of controlling exposures to indoor air pollutants of both indoor and outdoor origin. Exposures are controlled through a two-step sequential approach, in which source control is the primary strategy, while ventilation is the secondary strategy once all options for source control have been fully implemented. World Health Organization (WHO) air quality (AQ) guidelines are used to set the exposure limits. A decision diagram is created for guidance through the process of source control and to aid in

4

Proposal Preparation at a Glance Planning Ahead  

E-Print Network [OSTI]

I Need to Provide to ORA? 1. A budget in the standard CSM format. Use our template at http://inside.minesProposal Preparation at a Glance Planning Ahead Indirect Cost Exceptions Read your proposal website at: http://inside.mines.edu/Research_Administration under "What's New." Cost Sharing

5

NETL: Guide for Preparation of Cost Proposals  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Business Opportunities and Business Opportunities Guide for Preparation of Cost Proposals The following guide is to be used in the preparation of the offeror's cost proposal. It provides general instructions as well as the format, exhibits and content that is required to be included in the submission. In addition, the exhibits include examples of both cost elements and indirect rate data that are in typical proposals. Please note that these are provided as a guide only. Do not attempt to conform your proposal to match the exact elements and accounts in the examples. Both the cost elements and indirect rate data in your proposal should be able to be traced to and supported by your accounting system. Any questions should be directed to the contact person noted in the instructions.

6

DOE Signs Notice to Prepare Environmental Assessment on Proposed...  

Broader source: Energy.gov (indexed) [DOE]

DOE Signs Notice to Prepare Environmental Assessment on Proposed Project with Germany DOE Signs Notice to Prepare Environmental Assessment on Proposed Project with Germany June 30,...

7

Guide for Preparation of Contract Cost Proposals  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NATIONAL ENERGY TECHNOLOGY LABORATORY NATIONAL ENERGY TECHNOLOGY LABORATORY 3610 Collins Ferry Road 626 Cochrans Mill Road P.O. Box 880 P.O. Box 10940, Morgantown, WV 26507-0880 Pittsburgh, PA 15236-0940 This guide is available on the Department of Energy, National Energy Technology Laboratory web site at: http://www.netl.doe.gov/business/index.html TABLE OF CONTENTS GENERAL INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rounding Off . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Format and Content of the Cost Proposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cost Proposal Preparation Assistance . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8

Team leader`s preparation guide for Operational Readiness Reviews (ORR)  

SciTech Connect (OSTI)

This document provides instructions, explanations, and examples for the performance of all phases of an Operational Readiness Review (ORR). Details pertinent to the team leader, team members, and review coordinator are outlined. Sample forms and correspondence are included in appendices. Although this document is for use by DOE ORR team leaders, it can be used by contractor ORR team leaders also.

Not Available

1994-09-01T23:59:59.000Z

9

DOE-L.__ PROPOSAL PREPARATION INSTRUCTIONS - COVER LETTER AND  

Broader source: Energy.gov (indexed) [DOE]

L.__ PROPOSAL PREPARATION INSTRUCTIONS - COVER LETTER AND L.__ PROPOSAL PREPARATION INSTRUCTIONS - COVER LETTER AND VOLUME I, OFFER AND OTHER DOCUMENTS (a) Instruction - Cover Letter. The cover letter shall include, but not be limited to, the following: (1) The solicitation number. (2) The name, address, telephone numbers, facsimile numbers, and electronic addresses of the Offeror. (3) A statement identifying any exceptions or deviations the Offeror is taking to the terms and conditions specified in the contract (Sections A through K of this solicitation, as amended). However, exceptions and/or deviations are not sought and the Government is under no obligation to enter into discussions. Exceptions or deviations may constitute a deficiency. (4) The names, titles, telephone numbers, facsimile numbers, and

10

DOE-HDBK-3012-96; Team Leader's Preparation Guide for Operational Readiness Reviews (ORR)  

Broader source: Energy.gov (indexed) [DOE]

INCH-POUND INCH-POUND DOE-HDBK-3012-96 June 1996 SUPERSEDING DOE-HDBK-3012-94 September 1994 DOE HANDBOOK GUIDE TO GOOD PRACTICES FOR OPERATIONAL READINESS REVIEWS (ORR) TEAM LEADER'S GUIDE U.S. Department of Energy AREA MISC Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (423) 576-8401. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 487-4650. Order No. DE96009471 DOE-HDBK-3012-96 iii FOREWORD This Department of Energy handbook, Guide to Good Practices for Conducting Operational

11

A Review of the World Bank Forest Carbon Partnership Facility Readiness  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » A Review of the World Bank Forest Carbon Partnership Facility Readiness Preparation Proposals Jump to: navigation, search Tool Summary Name: A Review of the World Bank Forest Carbon Partnership Facility Readiness Preparation Proposals Agency/Company /Organization: World Resources Institute Sector: Land Focus Area: Forestry Topics: Implementation, Policies/deployment programs Resource Type: Lessons learned/best practices Website: pdf.wri.org/working_papers/getting_ready_2010-07-13.pdf A Review of the World Bank Forest Carbon Partnership Facility Readiness Preparation Proposals Screenshot References: A Review of R-PP[1] This working paper is part of a series of regular updates reviewing the Readiness Preparation Proposals (R-PPs) submitted by REDD+ Country

12

An Overview of Readiness for REDD: A compilation of readiness activities  

Open Energy Info (EERE)

An Overview of Readiness for REDD: A compilation of readiness activities An Overview of Readiness for REDD: A compilation of readiness activities prepared on behalf of the Forum on Readiness for REDD Jump to: navigation, search Tool Summary LAUNCH TOOL Name: An Overview of Readiness for REDD: A compilation of readiness activities prepared on behalf of the Forum on Readiness for REDD Agency/Company /Organization: The Woods Hole Research Center Sector: Land Focus Area: Forestry Topics: Implementation, Policies/deployment programs Resource Type: Lessons learned/best practices Website: www.cbd.int/forest/doc/overview-readiness-redd.pdf An Overview of Readiness for REDD: A compilation of readiness activities prepared on behalf of the Forum on Readiness for REDD Screenshot References: Overview of REDD[1] Background "This background document aims to provide a snapshot view of readiness

13

Procedures for Preparing the Research Project Proposal (Revised: March 5, 2010) 1 PROCEDURES FOR A PROJECT  

E-Print Network [OSTI]

Procedures for Preparing the Research Project Proposal (Revised: March 5, 2010) 1 PROCEDURES FOR A PROJECT: for the Master of Science in Human-Computer Interaction, IN 46202 Indiana University - Purdue University, Indianapolis (IUPUI) #12;Procedures for Preparing

Zhou, Yaoqi

14

TECHNOLOGY READINESS ASSESSMENT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DECEMBER 2012 DECEMBER 2012 Pathway for readying the next generation of affordable clean energy technology -Carbon Capture, Utilization, and Storage (CCUS) 2012 TECHNOLOGY READINESS ASSESSMENT -OVERVIEW 2 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 3 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal li- ability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific

15

Roundtable on Sustainable Biofuels Certification Readiness Study  

E-Print Network [OSTI]

Roundtable on Sustainable Biofuels Certification Readiness Study: Hawai`i Biofuel Projects Prepared 12.1 Deliverable Bioenergy Analyses Prepared by Hawai`i Biofuel Foundation And NCSI Americas Inc agency thereof. #12;1 RSB Certification Readiness Study: Hawaii Biofuel Projects Prepared For Hawaii

16

COMPARING TRADITIONAL MATH INSTRUCTION TO ONLINE INSTRUCTION: PREPARING STUDENTS FOR THE KANSAS COLLEGE AND CAREER READY STANDARDS  

E-Print Network [OSTI]

assessments have not helped prepare students. Differentiated instruction may be necessary to help learners achieve greater gains in math. This study focused on two fifth grade classrooms. Students in the control class received traditional math instruction...

Argubright, Matthew Thomas

2014-05-31T23:59:59.000Z

17

DOE Signs Notice to Prepare Environmental Assessment on Proposed Project with Germany  

Broader source: Energy.gov [DOE]

WASHINGTON, D.C. The Energy Department recently signed a notice of intent to prepare an environmental assessment to analyze the potential environmental impacts from a proposed project to accept used nuclear fuel from the Federal Republic of Germany at DOEs Savannah River Site (SRS) for processing and disposition.

18

DOE Zero Energy Ready Home Consolidated Renewable Energy Ready...  

Energy Savers [EERE]

Consolidated Renewable Energy Ready Checklist DOE Zero Energy Ready Home Consolidated Renewable Energy Ready Checklist All homes certified as DOE Zero Energy Ready Homes must meet...

19

Roundtable on Sustainable Biofuels Certification Readiness Study  

E-Print Network [OSTI]

Roundtable on Sustainable Biofuels Certification Readiness Study: Hawai`i Biofuel Projects Prepared 12.1 Deliverable (item 2) Bioenergy Analyses Prepared by Hawai`i Biofuel Foundation And NCSI Americas: Hawaii Biofuel Projects Prepared For Hawaii Natural Energy Institute School of Ocean Earth Sciences

20

Operational Readiness Team: OPERATIONAL READINESS REVIEW PLAN FOR THE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

oak ridge oak ridge 12 ...... Prepared by the Operational Readiness Team: OPERATIONAL READINESS REVIEW PLAN FOR THE RAD1 0 1 SOT0 PE THERMOELECTRIC GENERATOR MATERIALS PRODUCTION TASKS R. H. Cooper M. M. Martin C. R. Riggs R. L. Beatty E. K. Ohriner R. N. Escher OISTRIBUTIQM OF THIS DOCUMENT IS UNLIMITED DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency Thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Community Readiness Project Helps State Get Ready for Electric...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Community Readiness Project Helps State Get Ready for Electric Vehicles Community Readiness Project Helps State Get Ready for Electric Vehicles April 10, 2013 - 12:00am Addthis In...

22

Solar Ready Buildings Planning Guide  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

78 78 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 Technical Report NREL/TP-7A2-46078 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson Prepared under Task No. PVC9.92DA NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any

23

Solar Ready Buildings Planning Guide  

Broader source: Energy.gov (indexed) [DOE]

6078 6078 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 Technical Report NREL/TP-7A2-46078 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson Prepared under Task No. PVC9.92DA NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any

24

PROPOSAL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Downhole Motors Downhole Motors Department of Energy National Petroleum Technology Office Final Report Work Performed Under Contract Task 03NT30429 Sub-Task 1: Current Capabilities of Hydraulic Motors, Air/Nitrogen Motors, and Electric Downhole Motors January 30, 2004 Prepared By: RIO Technical Services 4200 South Hulen, Suite 630 Fort Worth, Texas 76109 (817) 735-8264 RIO Technical Services Page 1 NPTO Downhole Motors TABLE OF CONTENTS Section 1.0................................................................................Introduction Section 2.0.................Brief History of Coil Tubing and Summary of Downhole Motors Section 3.0.....................................................................Results and Findings 3.1............Motors

25

PROPOSAL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hydraulic Motion & Fluid Movement Hydraulic Motion & Fluid Movement RIO Technical Services Page 1 Department of Energy National Petroleum Technology Office Final Report Work Performed Under Contract Task 03NT30429 Sub-Task 2: Hydraulic Motion & Fluid Movement Through Small Diameter Pipes and Wellbores December 12, 2003 Prepared By: RIO Technical Services 4200 South Hulen, Suite 630 Fort Worth, Texas 76109 (817) 735-8264 NPTO Hydraulic Motion & Fluid Movement RIO Technical Services Page 2 TABLE OF CONTENTS Section 1.0 .............................................................................Introduction Section 2.0........................................................................Results& Findings 2.1..........Significant Parameters Affecting Efficient Cuttings Transport

26

Technology Readiness Assessment Report  

Broader source: Energy.gov [DOE]

This document has been developed to guide individuals and teams that will be involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the...

27

Beamline Commissioning Readiness Review Team  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ES&H and User Safety Officer T. Kruy AES Front Ends Readiness G. Markovich AES PSS & EPS Readiness M. Merritt AES Insertion Device Readiness M. Ramanathan AES CCSM & Chair AES...

28

Technology Readiness Assessment Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Guide assists individuals and teams involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the DOE capital asset projects subject to DOE O 413.3B. Cancels DOE G 413.3-4.

2011-09-15T23:59:59.000Z

29

Emergency Readiness Assurance Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish the requirements of the Emergency Readiness Assurance Program with a goal of assurting that the Department of Energy (DOE) Emergency Management System (EMS) is ready to respond promptly, efficiently, and effectively to any emergency involving DOE facilities or requiring DOE assistance. Cancels DOE O 5500.10 dated 4-30-91. Chg 1 dated 2-27-92. Change 1 canceled by DOE O 151.1 of 9-25-95.

1992-02-27T23:59:59.000Z

30

Notice of Intent to Prepare an Environmental Impact Statement for the Proposed Sutter Power Plant and Transmission Line Project, California  

Broader source: Energy.gov (indexed) [DOE]

2 2 Federal Register / Vol. 63, No. 30 / Friday, February 13, 1998 / Notices taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a motion to intervene. Copies of his filing are on file with the Commission and are available for public inspection in the Public Reference Room. David P. Boergers, Acting Secretary. [FR Doc. 98-3659 Filed 2-12-98; 8:45 am] BILLING CODE 6717-01-M DEPARTMENT OF ENERGY Western Area Power Administration Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Sutter Power Plant and Transmission Line Project, California AGENCY: Western Area Power Administration, DOE. ACTION: Notice of intent to prepare an Environmental Impact Statement. SUMMARY: In accordance with Section

31

Technology Readiness Assessments | Department of Energy  

Office of Environmental Management (EM)

Technology Readiness Assessments Technology Readiness Assessments Documents Available for Download August 1, 2013 Technology Readiness Assessment (TRA)Technology Maturation Plan...

32

Prepared  

Office of Legacy Management (LM)

Prepared Prepared by Oak Ridge Associated Universities Prepared for Division of Remedial Action Projects U.S. Department of Energy COMPREHENSIVE RADIOLOGICAL SURVEY OFF-SITE PROPERTYM NIAGARA FALLS STORAGE SITE LEWISTON, NEW YORK B.P. ROCCO Radiological Site Assessment Program Manpower Education, Research, and Training Division FINAL REPORT May 1983 B.P. Rocco FINAL REPORT Prepared for A.M. pitt T.J. Sowell C.F. Weaver T.S. Yoo Project Staff Prepared by J.D. Berger R.D. Condra R.C. Gosslee J.A. Mattina OFF-SITE PROPERTY M NIAGARA FALLS STORAGE SITE LEWISTON, NEW YORK CO~WREHENSIVE RADIOLOGICAL SURVEY Radiological Site Assessment Program Manpower Education, Research, and Training Division Oak Ridge Associated Universities Oak Ridge, Tennessee 37830 U.S. Department of Energy as part of the Formerly Utilized Sites -- Remedial Action Program May 1983 -- til - This

33

Construction Readiness RM  

Broader source: Energy.gov (indexed) [DOE]

Construction Readiness Review Module Construction Readiness Review Module March 2010 CD- [This Rev Readiness -0 view Module w s Review (CRR OFFICE O CD-1 was used to dev R). This Review OF ENVIRO Standard R Construc Rev Critical D CD-2 M velop the Revie w Module cont ONMENTA Review Pla ction Rea view Modul Decision (CD C March 2010 ew Plan for Sal tains the lesson Review.] AL MANAG an (SRP) adiness le D) Applicabili D-3 lt Waste Proce ns learned from GEMENT ity CD-4 ssing Facility ( m the SWPF Co Post Ope (SWPF) Const onstruction Re eration truction eadiness Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental

34

Technology Readiness Assessment Report  

Broader source: Energy.gov (indexed) [DOE]

Technology Readiness Assessment Report Technology Readiness Assessment Report March 2010 U U . . S S . . D D e e p p a a r r t t m m e e n n t t o o f f E E n n e e r r g g y y O O f f f f i i c c e e o o f f E E n n v v i i r r o o n n m m e e n n t t a a l l M M a a n n a a g g e e m m e e n n t t Technology Readiness Assessment (TRA) / Technology Maturation Plan (TMP) Process Guide March 2008 U.S. DOE Office of Environmental Management March 2008 TRA/TMP Process Guide Page 2 of 48 TABLE OF CONTENTS 1.0 INTRODUCTION ...................................................................................................................... 4 1.1 Document Purpose............................................................................................................................ 4 2.0 OVERVIEW OF TECHNOLOGY READINESS ASSESSMENTS AND TECHNOLOGY MATURATION PLANS

35

Savannah River Site Salt Waste Processing Facility Technology Readiness Assessment Report  

Broader source: Energy.gov (indexed) [DOE]

Salt Waste Processing Facility Salt Waste Processing Facility Technology Readiness Assessment Report Kurt D. Gerdes Harry D. Harmon Herbert G. Sutter Major C. Thompson John R. Shultz Sahid C. Smith July 13, 2009 Prepared by the U.S. Department of Energy Washington, D.C. SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 ii This page intentionally left blank SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 iii SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 iii Signatures SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 iv This page intentionally left blank SRS Salt Waste Processing Facility

36

DOE Zero Energy Ready Home Resources  

Broader source: Energy.gov [DOE]

DOE Zero Energy Ready Home provides resources for successfully building and selling zero-energy ready homes in today's market.

37

Readiness Review RM  

Broader source: Energy.gov (indexed) [DOE]

Readiness Review Module Readiness Review Module March 2010 CD-0 O 0 OFFICE OF C CD-1 F ENVIRO Standard R Readin Rev Critical Decis CD-2 M ONMENTAL Review Plan ness Rev view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) view e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-

38

Readiness Review Program  

Broader source: Energy.gov (indexed) [DOE]

Review Program Review Program FUNCTIONAL AREA GOAL: DOE/NNSA Headquarters and Field organizations and their contractors responsible for the startup and operation of nuclear facilities have defined and implemented contractual requirements to manage, evaluate, and approve the startup and restart of nuclear facilities and activities. REQUIREMENTS:  DOE Order 425.1C, Startup and Restart of Nuclear Facilities  DOE P 450.4, Safety Management System Policy  DOE/NNSA Safety Management Functions, Responsibilities and Authorities Manual Guidance:  DOE-STD-3006-2000, Planning and Conduct of Operational Readiness Reviews  DOE-HDBK- 3012-2003, Operational Readiness Review Team Leaders Handbook  DOE G 450.4-1B, Integrated Safety Management System Guide

39

Readiness Review Training - Member | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Member Member Readiness Review Training - Member November 10, 2010 Readiness Review Member Training at the Idaho National Laboratory Course provides tools and tips to be an effective readiness review team member. Topics include: An understanding of the background behind the Readiness Review Process; Training in the mechanics of performance and reporting of a Readiness Review; Knowledge of current DOE Orders, Directives, and References for the Readiness Review process; Training in Performance-Based Assessment Processes and Official DOE Team Member Readiness Review Training Methods Readiness Review Training - Member More Documents & Publications Readiness Review Training - Team Leader Readiness Review Training - Development of Criteria And Review Approach Documents

40

Vehicle Technologies Office: Community and Fleet Readiness  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Community and Fleet Readiness Community and Fleet Readiness As researchers work to lower the costs and increase the convenience of plug-in electric vehicles (PEVs), it's also necessary to make similar strides on the local level. State and local incentives, such as tax credits or access to HOV lanes, can encourage consumers and vehicle fleets to purchase PEVs. In contrast, difficult permitting procedures for chargers or a lack of signage can discourage adoption. To help communities prepare themselves for plug-in and other alternative fuel vehicles, the Office works with nearly 100 Clean Cities coalitions across the country. Clean Cities offers a wide variety of resources to cities and regions that want to encourage citizens and businesses to drive PEVs. They also offer resources to both public and private fleets that wish to adopt these vehicles.

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Ready, set, go . . . well maybe  

E-Print Network [OSTI]

at the 2011 Applied Ergonomics Conference By Melaniesustainable? Case study of ergonomics program that was notwas not! Case study of ergonomics program that was ready

Alexandre, Melanie M

2011-01-01T23:59:59.000Z

42

Readiness Review | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is documented on a Readiness Review Activity Approval Form. Once the agreed upon conditions and requirements are met the review is finalized through Operational Approval...

43

Training Program Graduates Weatherization-Ready Workers | Department of  

Broader source: Energy.gov (indexed) [DOE]

Training Program Graduates Weatherization-Ready Workers Training Program Graduates Weatherization-Ready Workers Training Program Graduates Weatherization-Ready Workers April 29, 2010 - 5:45pm Addthis Daniel Tello demonstrates how to prepare an attic space for insulation using skills learned from the First Choice Program. | Photo courtesy of HCDC, Human Capital Development Corp., Inc. and Scott Anderson Daniel Tello demonstrates how to prepare an attic space for insulation using skills learned from the First Choice Program. | Photo courtesy of HCDC, Human Capital Development Corp., Inc. and Scott Anderson Lindsay Gsell On graduation day, students at Human Capital Development Corp., Inc. (HCDC) leave with more than just a diploma. They receive a hard hat, tool belt, hammer, utility knife and a tape measure. Graduates from Racine, Wis.-based HCDC First Choice Program are literally

44

Clean Cities: Electric Vehicle Community Readiness Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Financial Opportunities Financial Opportunities Printable Version Share this resource Send a link to Clean Cities: Electric Vehicle Community Readiness Projects to someone by E-mail Share Clean Cities: Electric Vehicle Community Readiness Projects on Facebook Tweet about Clean Cities: Electric Vehicle Community Readiness Projects on Twitter Bookmark Clean Cities: Electric Vehicle Community Readiness Projects on Google Bookmark Clean Cities: Electric Vehicle Community Readiness Projects on Delicious Rank Clean Cities: Electric Vehicle Community Readiness Projects on Digg Find More places to share Clean Cities: Electric Vehicle Community Readiness Projects on AddThis.com... Current Opportunities Related Opportunities Funded Projects Recovery Act Projects Community Readiness Projects Alternative Fuel Market Projects

45

Solar Ready: An Overview of Implementation Practices  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

that solar ready itself does not reduce energy use or replace conventional energy with green energy. Solar ready does not contribute toward carbon emissions reduction until...

46

Wind Offshore Port Readiness | Department of Energy  

Office of Environmental Management (EM)

Wind Offshore Port Readiness Wind Offshore Port Readiness This study will aid decision-makers in making informed decisions regarding the choice of ports for specific offshore...

47

Readiness Review Training - Member | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

- Member November 10, 2010 Readiness Review Member Training at the Idaho National Laboratory Course provides tools and tips to be an effective readiness review team member....

48

Marine & Hydrokinetic Technology Readiness Initiative TIDAL ENERGY...  

Office of Scientific and Technical Information (OSTI)

Marine & Hydrokinetic Technology Readiness Initiative TIDAL ENERGY SYSTEM FOR ON-SHORE POWER GENERATION Marine & Hydrokinetic Technology Readiness Initiative DE-EE0003636 TIDAL...

49

Notice of Intent to Prepare an Environmental Impact Statement for the Proposed McIntosh Unit 4 Pressurized Circulating Fluidized Bed Demonstration Project, March 25, 1999  

Broader source: Energy.gov (indexed) [DOE]

10 10 Federal Register / Vol. 64, No. 58 / Friday, March 26, 1999 / Notices DEPARTMENT OF ENERGY Notice of Intent To Prepare an Environmental Impact Statement for the Proposed McIntosh Unit 4 Pressurized Circulating Fluidized Bed Demonstration Project AGENCY: U.S. Department of Energy. ACTION: Notice of intent to prepare an Environmental Impact Statement. SUMMARY: The U.S. Department of Energy (DOE) announces its intent to prepare an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act (NEPA), the Council on Environmental Quality (CEQ) NEPA regulations (40 CFR Parts 1500-1508), and the DOE NEPA regulations (10 CFR Part 1021), to assess the potential environmental and human health impacts of a proposed project to expand the C. D. McIntosh, Jr. Power

50

Readiness Review RM  

Broader source: Energy.gov [DOE]

This module assists DOE Federal line management in their efforts to bring a project or facility into a condition where it is sufficiently prepared to start or resume operations prior to CD-4...

51

Question and Answers Alternative Fuel Readiness Plans  

E-Print Network [OSTI]

Question and Answers Alternative Fuel Readiness Plans PON-13-603 September 3, 2013 Eligibility Q1 to readiness plans? A1 This solicitation is limited to readiness planning only for alternative fuels. Q2 In regards to PON-13-603 - Alternative Fuel Readiness Plans, is electricity used for transportation

52

Physical Activity Readiness Medical Examination  

E-Print Network [OSTI]

Conveyance/Referral: NAME ______________________________________________________ ADDRESS or prescribed exercise. · Physical Activity Readiness Conveyance/Referral Form - an optional tear-off tab for the physician to convey clearance for physical activity participation, or to make a referral to a medically

Waterloo, University of

53

Hydrogen Infrastructure Market Readiness Workshop  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) hosted the Hydrogen Infrastructure Market Readiness Workshop February 1617, 2011, in Washington, D.C....

54

Are You Ready for Fall? | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Are You Ready for Fall? Are You Ready for Fall? Are You Ready for Fall? October 21, 2011 - 6:38am Addthis This week, Andrea talked about insulating her water heater tank in preparation for cooler weather (of course, that's something you can do any time of year to save money and energy at home). She also listed many other ways to reduce your water heating costs. Erin blogged about something we don't often think about: the historical perspective of using renewable energy. For example, Leonardo da Vinci had designed a solar powered water heater among other things. As for geothermal energy, archaeological evidence shows that the first human use of geothermal resources in North America occurred more than 10,000 years ago. Whether you're using renewables or energy efficiency (or both), what are

55

SRS Tank 48H Waste Treatment Project Technology Readiness Assessment  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site Tank 48H Savannah River Site Tank 48H Waste Treatment Project Technology Readiness Assessment Harry D. Harmon Joan B. Berkowitz John C. DeVine, Jr. Herbert G. Sutter Joan K. Young SPD-07-195 July 31, 2007 Prepared by the U.S. Department of Energy Aiken, South Carolina SRS Tank 48H Waste Treatment Project SPD-07-195 Technology Readiness Assessment July 31, 2007 Signature Page 7/31/07 ___________________________ _________________________ John C. DeVine, Jr., Team Member Date SRS Tank 48H Waste Treatment Project SPD-07-195 Technology Readiness Assessment July 31, 2007 Executive Summary The purpose of this assessment was to determine the technology maturity level of the candidate Tank 48H treatment technologies that are being considered for implementation at DOE's

56

Are You Ready for Fall? | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Are You Ready for Fall? Are You Ready for Fall? Are You Ready for Fall? October 21, 2011 - 6:38am Addthis This week, Andrea talked about insulating her water heater tank in preparation for cooler weather (of course, that's something you can do any time of year to save money and energy at home). She also listed many other ways to reduce your water heating costs. Erin blogged about something we don't often think about: the historical perspective of using renewable energy. For example, Leonardo da Vinci had designed a solar powered water heater among other things. As for geothermal energy, archaeological evidence shows that the first human use of geothermal resources in North America occurred more than 10,000 years ago. Whether you're using renewables or energy efficiency (or both), what are

57

EIS-0186: Proposed Healy Clean Coal Project, Healy, AK  

Broader source: Energy.gov [DOE]

This environmental impact statement analyzes two proposed technologies. Under the Department of Energy's third solicitation of the Clean Coal Technology Program, the Alaska Industrial Development and Export Authority conceived, designed, and proposed the Healy Clean Coal Project. The project, a coal-fired power generating facility, would provide the necessary data for evaluating the commercial readiness of two promising technologies for decreasing emissions of sulfur dioxide, oxides of nitrogen, and particulate matter. DOE prepared this statement to analyze potential impacts of their potential support for this project.

58

Student Design Competition Guide to Project Preparation and Submittal  

Broader source: Energy.gov [DOE]

Student Design Competition Guide to Project Preparation and Submittal, from the U.S. Department of Energy's Zero Energy Ready Home program.

59

Clean Cities: Electric Vehicle Community Readiness Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Events Events Printable Version Share this resource Send a link to Clean Cities: Electric Vehicle Community Readiness Workshop to someone by E-mail Share Clean Cities: Electric Vehicle Community Readiness Workshop on Facebook Tweet about Clean Cities: Electric Vehicle Community Readiness Workshop on Twitter Bookmark Clean Cities: Electric Vehicle Community Readiness Workshop on Google Bookmark Clean Cities: Electric Vehicle Community Readiness Workshop on Delicious Rank Clean Cities: Electric Vehicle Community Readiness Workshop on Digg Find More places to share Clean Cities: Electric Vehicle Community Readiness Workshop on AddThis.com... Conferences & Workshops Clean Cities 20th Anniversary Electric Vehicle Community Readiness Stakeholder Summit Waste-to-Wheels Plug-In Vehicle & Infrastructure

60

Zero Energy Ready Home Update Newsletter  

Broader source: Energy.gov [DOE]

Welcome to Zero Energy Ready Home Updateyour connection to news from the U.S. Department of Energys Zero Energy Ready Home program, which supports housing industry leaders with the tools...

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Preparing for the Unexpected  

E-Print Network [OSTI]

information on family disaster plans, see the Get Prepared section at www.ready.gov/index.html. #24; Deciding to stay or go You may be faced with the decision to evacuate or shelter-in-place. Evacuation means moving from an unsafe place to a safe place in a... information on family disaster plans, see the Get Prepared section at www.ready.gov/index.html. #24; Deciding to stay or go You may be faced with the decision to evacuate or shelter-in-place. Evacuation means moving from an unsafe place to a safe place in a...

Harris, Janie; Norman, Lisa; Lesikar, Bruce J.; Smith, David

2007-03-26T23:59:59.000Z

62

Solar Ready: An Overview of Implementation Practices  

SciTech Connect (OSTI)

This report explores three mechanisms for encouraging solar ready building design and construction: solar ready legislation, certification programs for solar ready design and construction, and stakeholder education. These methods are not mutually exclusive, and all, if implemented well, could contribute to more solar ready construction. Solar ready itself does not reduce energy use or create clean energy. Nevertheless, solar ready building practices are needed to reach the full potential of solar deployment. Without forethought on incorporating solar into design, buildings may be incompatible with solar due to roof structure or excessive shading. In these cases, retrofitting the roof or removing shading elements is cost prohibitive. Furthermore, higher up-front costs due to structural adaptations and production losses caused by less than optimal roof orientation, roof equipment, or shading will lengthen payback periods, making solar more expensive. With millions of new buildings constructed each year in the United States, solar ready can remove installation barriers and increase the potential for widespread solar adoption. There are many approaches to promoting solar ready, including solar ready legislation, certification programs, and education of stakeholders. Federal, state, and local governments have the potential to implement programs that encourage solar ready and in turn reduce barriers to solar deployment. With the guidance in this document and the examples of jurisdictions and organizations already working to promote solar ready building practices, federal, state, and local governments can guide the market toward solar ready implementation.

Watson, A.; Guidice, L.; Lisell, L.; Doris, L.; Busche, S.

2012-01-01T23:59:59.000Z

63

Digital Forensic Readiness: Are We There Yet?  

E-Print Network [OSTI]

Digital Forensic Readiness: Are We There Yet? Antonis Mouhtaropoulos, Chang-Tsun Li Department.co.za Abstract--Digital Forensic Readiness is defined as the pre- incident plan that deals with an organization for a common forensic readiness standard. This article reviews a number of key initiatives in order to point

Li, Chang-Tsun

64

NETL: News Release - Climate Technology: DOE Readies First Big U.S.  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 , 2007 3 , 2007 Climate Technology: DOE Readies First Big U.S. Projects in CO2 Capture and Storage Regional Partnerships' Effort Could Triple World's Largest Demonstration, Blaze Trails WASHINGTON, DC - The U.S. Department of Energy is preparing to commission this year America's first large-scale demonstrations of CO2 capture and deep geologic storage in fulfillment of a commitment announced last October to Phase III of the Carbon Sequestration Regional Partnerships Program. The projects could lead to a tripling of the world's present large-scale demonstrations. MORE INFO Learn more about DOE's Carbon Sequestration Regional Partnerships Program Proposals for the Phase III demonstrations, part of the President's Climate Change Technology Initiative, include the world's earliest examination of

65

Transportation System Readiness and Resiliency Assessment Framework: Readiness and Assess Resiliency of  

E-Print Network [OSTI]

Transportation System Readiness and Resiliency Assessment Framework: Readiness and Assess Resiliency of Transportation Systems (Infrastructure, Systems, Organization and Services) to Deter, Detect Flows Passenger Flows Supply Chain Efficiency Transportation: Energy Environment Safety Security Vehicle

66

Organizational Readiness in Specialty Mental Health Care  

E-Print Network [OSTI]

readiness for change (ORC) measure, and key stake- holders43 clinical staff completed the ORC, and 38 key stakeholdersdeviations (SDs) of the ORC scores are also illuminating in

Hamilton, Alison B.; Cohen, Amy N.; Young, Alexander S.

2010-01-01T23:59:59.000Z

67

ORISE: Asset Readiness Management System (ARMS)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Asset Readiness Management System (ARMS) Database tracks emergency response exercises and equipment to help DOE asses emergency preparedness Developed by the Oak Ridge Institute...

68

Hydrogen Infrastructure Market Readiness Workshop Agenda | Department...  

Broader source: Energy.gov (indexed) [DOE]

Market Readiness Workshop, hosted by the U.S. Department of Energy's National Renewable Energy Laboratory, February 16-17, 2011, in Washington, DC. wkshpmarketreadinessagenda....

69

Hydrogen Infrastructure Market Readiness: Opportunities and Potential...  

Broader source: Energy.gov (indexed) [DOE]

Opportunities and Potential for Near-term Cost Reductions. Proceedings of the Hydrogen Infrastructure Market Readiness Workshop and Summary of Feedback Provided through the...

70

LWRS ATR Irradiation Testing Readiness Status  

SciTech Connect (OSTI)

The Light Water Reactor Sustainability (LWRS) Program was established by the U.S. Department of Energy Office of Nuclear Energy (DOE-NE) to develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors. The LWRS Program is divided into four R&D Pathways: (1) Materials Aging and Degradation; (2) Advanced Light Water Reactor Nuclear Fuels; (3) Advanced Instrumentation, Information and Control Systems; and (4) Risk-Informed Safety Margin Characterization. This report describes an irradiation testing readiness analysis in preparation of LWRS experiments for irradiation testing at the Idaho National Laboratory (INL) Advanced Test Reactor (ATR) under Pathway (2). The focus of the Advanced LWR Nuclear Fuels Pathway is to improve the scientific knowledge basis for understanding and predicting fundamental performance of advanced nuclear fuel and cladding in nuclear power plants during both nominal and off-nominal conditions. This information will be applied in the design and development of high-performance, high burn-up fuels with improved safety, cladding integrity, and improved nuclear fuel cycle economics

Kristine Barrett

2012-09-01T23:59:59.000Z

71

DOE Zero Energy Ready Home Verification | Department of Energy  

Energy Savers [EERE]

Verification DOE Zero Energy Ready Home Verification DOE Zero Energy Ready Homes Verification, a publication of the U.S. Department of Energy Zero Energy Ready Homes program. DOE...

72

Project Get Ready | Open Energy Information  

Open Energy Info (EERE)

Get Ready Get Ready Jump to: navigation, search Name Project Get Ready Agency/Company /Organization Rocky Mountain Institute Sector Energy Focus Area Transportation Topics Implementation Resource Type Dataset Website http://projectgetready.com/ Equivalent URI http://cleanenergysolutions.org/content/project-get-ready-pgr-total-cost-vehicle-ownership-calculator-0, http://cleanenergysolutions.org/content/project-get-ready-pgr-total-cost-vehicle-ownership-calculator References [1] Abstract The calculator allows individuals to consider the purchase cost (including financing) and the fuel cost of electric vehicles compared to conventional vehicles over a lifetime of 15 years. Consumers should also consider driving habits, maintenance costs, insurance, resale value, and potential battery and charging infrastructure costs.

73

Hawaii Gets 'EV Ready' | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Gets 'EV Ready' Gets 'EV Ready' Hawaii Gets 'EV Ready' January 31, 2012 - 11:09am Addthis Last July, Governor Neil Abercrombie unveiled the first public charging station installed in the state capitol’s underground parking garage with the "Hawaii EV Ready" program. In 2011, rebates were approved for 237 electric vehicles and 168 chargers. | Photo courtesy of the Office of the Governor. Last July, Governor Neil Abercrombie unveiled the first public charging station installed in the state capitol's underground parking garage with the "Hawaii EV Ready" program. In 2011, rebates were approved for 237 electric vehicles and 168 chargers. | Photo courtesy of the Office of the Governor. Julie McAlpin Communications Liaison, State Energy Program By 2030, the Hawaii Clean Energy Initiative will:

74

Hawaii Gets 'EV Ready' | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Hawaii Gets 'EV Ready' Hawaii Gets 'EV Ready' Hawaii Gets 'EV Ready' January 31, 2012 - 11:09am Addthis Last July, Governor Neil Abercrombie unveiled the first public charging station installed in the state capitol’s underground parking garage with the "Hawaii EV Ready" program. In 2011, rebates were approved for 237 electric vehicles and 168 chargers. | Photo courtesy of the Office of the Governor. Last July, Governor Neil Abercrombie unveiled the first public charging station installed in the state capitol's underground parking garage with the "Hawaii EV Ready" program. In 2011, rebates were approved for 237 electric vehicles and 168 chargers. | Photo courtesy of the Office of the Governor. Julie McAlpin Communications Liaison, State Energy Program

75

Technology Readiness Assessments | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Waste Management » Tank Waste and Waste Processing » Waste Management » Tank Waste and Waste Processing » Technology Readiness Assessments Technology Readiness Assessments Documents Available for Download January 1, 2012 Compilation of TRA Summaries A compilation of all TRA Summaries November 1, 2011 Small Column Ion Exchange at Savannah River Site Technology Readiness Assessment Report February 7, 2011 Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 2 (CDP) Full Document and Summary Versions are available for download February 7, 2011 Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP) Full Document and Summary Versions are available for download November 1, 2009 K Basins Sludge Treatment Project Phase 1 Full Document and Summary Versions are available for download

76

Robertsons Ready Mix | Open Energy Information  

Open Energy Info (EERE)

Robertsons Ready Mix Robertsons Ready Mix Jump to: navigation, search Name Robertsons Ready Mix Facility Robertsons Ready Mix Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Foundation Windpower Developer Foundation Windpower Energy Purchaser Robertsons Ready Mix Location Cabazon CA Coordinates 33.915842°, -116.81325° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.915842,"lon":-116.81325,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

77

Planning and Conducting Readiness Reviews  

Broader source: Energy.gov (indexed) [DOE]

3006-2010 3006-2010 ________________________ Superseding DOE-STD-3006-2000 June 2000 DOE STANDARD PLANNING AND CONDUCTING READINESS REVIEWS U.S. Department of Energy AREA OPER Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. TS This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. DOE-STD-3006-YR i CONTENTS FOREWORD................................................................................................................................. 1

78

Lightning Arrestor Connectors Production Readiness  

SciTech Connect (OSTI)

The Lightning Arrestor Connector (LAC), part M, presented opportunities to improve the processes used to fabricate LACs. The A## LACs were the first production LACs produced at the KCP, after the product was transferred from Pinnellas. The new LAC relied on the lessons learned from the A## LACs; however, additional improvements were needed to meet the required budget, yield, and schedule requirements. Improvement projects completed since 2001 include Hermetic Connector Sealing Improvement, Contact Assembly molding Improvement, development of a second vendor for LAC shells, general process improvement, tooling improvement, reduction of the LAC production cycle time, and documention of the LAC granule fabrication process. This report summarizes the accomplishments achieved in improving the LAC Production Readiness.

Marten, Steve; Linder, Kim; Emmons, Jim; Gomez, Antonio; Hasam, Dawud; Maurer, Michelle

2008-10-20T23:59:59.000Z

79

Advancing Technology Readiness: Wave Energy Testing and Demonstration...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Advancing Technology Readiness: Wave Energy Testing and Demonstration Advancing Technology Readiness: Wave Energy Testing and Demonstration March 6, 2014 - 1:23pm Addthis Northwest...

80

DOE Zero Energy Ready Home Case Study: John Hubert Associates...  

Energy Savers [EERE]

Homes, Double Oak, TX DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland, MI DOE Zero Energy Ready Home Case Study, Preferred Builders, Old Greenwich, CT, Custom...

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Quality Management Systems for Zero Energy Ready Home Webinar...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Quality Management Systems for Zero Energy Ready Home Webinar (Text Version) Quality Management Systems for Zero Energy Ready Home Webinar (Text Version) Below is the text version...

82

Energy -- and Water -- Efficiency in the DOE Zero Energy Ready...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Energy -- and Water -- Efficiency in the DOE Zero Energy Ready Home Program Webinar (Text Version) Energy -- and Water -- Efficiency in the DOE Zero Energy Ready Home Program...

83

EV Community Readiness projects: Center for Transportation and...  

Broader source: Energy.gov (indexed) [DOE]

EV Community Readiness projects: Center for Transportation and the Environment (GA, AL, SC); Centralina Council of Governments (NC) EV Community Readiness projects: Center for...

84

DOE Zero Energy Ready Home: Healthy Efficient Homes - Spirit...  

Energy Savers [EERE]

Old Greenwich, CT, Custom DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland, MI DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown, RI...

85

DOE Zero Energy Ready Home Case Study: Sterling Brook Custom...  

Energy Savers [EERE]

TX More Documents & Publications DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown, RI DOE Zero Energy Ready Home Case Study: Mandalay Homes, Prescott...

86

DOE Zero Energy Ready Home Case Study: Caldwell and Johnson,...  

Broader source: Energy.gov (indexed) [DOE]

Caldwell and Johnson, Charlestown, RI DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown, RI Case study of a DOE Zero Energy Ready affordable home in...

87

DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland...  

Office of Environmental Management (EM)

Old Greenwich, CT, Custom DOE Zero Energy Ready Home: Healthy Efficient Homes - Spirit Lake, Iowa DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown, RI...

88

Readiness Review Training - Team Leader | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Team Leader November 10, 2010 Readiness Review Team Leader Training at the Idaho National Laboratory Course provides tools and tips to be an effective readiness review team leader....

89

Oregon: Advancing Technology Readiness: Wave Energy Testing and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Oregon: Advancing Technology Readiness: Wave Energy Testing and Demonstration Oregon: Advancing Technology Readiness: Wave Energy Testing and Demonstration March 6, 2014 - 1:23pm...

90

Preliminary Technology Readiness Assessment (TRA) for the Calcine...  

Broader source: Energy.gov (indexed) [DOE]

Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP) Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project...

91

EV Community Readiness projects: New York City and Lower Hudson...  

Broader source: Energy.gov (indexed) [DOE]

ACCOMPLISHMENTS NYCLHVCC: Clean Cities 2011 EV Community Readiness DUANE Reade's Smith EV at Plug-In Day in Times Square Clean Cities 2011 Community Readiness & Planning...

92

Key Facts About Hurricane Readiness Preparing for a Hurricane  

E-Print Network [OSTI]

for washing. · Adjust the thermostat on refrigerators and freezers to the coolest possible temperature. If You

93

Shovel Ready Energy Project Grants (Florida)  

Broader source: Energy.gov [DOE]

This program leverages Floridas state energy grant initiatives to identify shovel-ready projects that can be expeditiously implemented through available SEP funding. The goal is to provide...

94

Guam- Solar-Ready Residential Building Requirement  

Broader source: Energy.gov [DOE]

Note: Guam is in the process of adopting a [www.guamenergy.com/outreach-education/guam-tropical-energy-code/ tropical energy code]. As a result, the solar ready provisions described below may...

95

Hydrogen Infrastructure Market Readiness Workshop: Preliminary Results  

Broader source: Energy.gov [DOE]

Preliminary results from the Hydrogen Infrastructure Market Readiness Workshop held February 16-17, 2011. This presentation was disseminated to workshop attendees to convey the aggregate and "raw" feedback collected during the workshop.

96

NanoReady Ltd | Open Energy Information  

Open Energy Info (EERE)

NanoReady Ltd NanoReady Ltd Jump to: navigation, search Name NanoReady Ltd Place Caesarea, Israel Zip 38900 Sector Solar Product String representation "NanoReady devel ... nd solar cells." is too long. Coordinates 32.483311°, 34.89521° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.483311,"lon":34.89521,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

97

Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP)  

Broader source: Energy.gov (indexed) [DOE]

TECHNOLOGY READINESS ASSESSMENT TECHNOLOGY READINESS ASSESSMENT OF THE CALCINE DISPOSITION PROJECT VOLUME ONE Anthony F. Kluk Hoyt C. Johnson Clyde Phillip McGinnis Michael Rinker Steven L. Ross Herbert G. Sutter John Vienna February 2011 Prepared by the U.S. Department of Energy Washington, DC February 2011 ii This page intentionally left blank. Review of Calcine Disposition Project Self-Assessment of Technology Maturation iii SIGNATURES ____________________________________ ____________________________________ Anthony F. Kluk, Team Lead Date ____________________________________ ____________________________________ Hoyt C. Johnson Date ____________________________________ ____________________________________ Clyde Phillip McGinnis Date ____________________________________ ____________________________________

98

Connecting Ready-to-Work Americans with Ready-to-Be-Filled Jobs...  

Energy Savers [EERE]

and Louisiana Economic Development are ready to provide technical assistance and capacity building training to diverse businesses. My office and the Department of Commerce will...

99

Getting Ready for Electric Drive: the Plug-In Vehicle and Infrastructure  

Broader source: Energy.gov (indexed) [DOE]

Ready for Electric Drive: the Plug-In Vehicle and Ready for Electric Drive: the Plug-In Vehicle and Infrastructure Workshop Getting Ready for Electric Drive: the Plug-In Vehicle and Infrastructure Workshop August 18, 2010 - 5:30pm Addthis Matt Rogers Matt Rogers McKinsey & Company Blogs have been abuzz on electric vehicles and advanced batteries recently, and likely in no small part due to some of the programs that are kicking into high gear at the Department of Energy right now. On July 22, we hosted a Plug-In Vehicle & Infrastructure Workshop that brought together nearly 200 attendees and 600 web participants to discuss near-term actions to accelerate deployment of electric-drive vehicles. The program demonstrated how federal leadership can speed up preparation for vehicles expected in showrooms at the end of this year. This leadership complements the Obama

100

MOVIE "CHICAGO CITY COUNCIL: READY FOR REFORM?" (27 minutes/color)  

E-Print Network [OSTI]

, transportation, and health care. 8. Investigate how many of the reform proposals were in place twenty years afterMOVIE ­ "CHICAGO CITY COUNCIL: READY FOR REFORM?" (27 minutes/color) SYNOPSIS Following the death of Mayor Harold Washington, residents and reformers of Chicago still hoped for continued reform in Chicago

Illinois at Chicago, University of

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Ready. Aim. Fire. | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Ready. Aim. Fire. Ready. Aim. Fire. Ready. Aim. Fire. March 28, 2011 - 4:27pm Addthis John Lippert I wrote in a previous blog posting about using digital electric meters to locate "leaking" electricity-often referred to as phantom loads and vampire loads-and high electrical power consumption. In another posting I described what I'm doing to reach out in my community to get my neighbors to use these meters to locate wasteful electricity usage in their homes. Now my community will have another tool in its arsenal to combat energy waste: a thermal leak detector. Whereas the digital electric meter helps locate electricity leaks, the thermal leak detector helps locate-well, you guessed it-thermal (heat) leaks. Heating and cooling your home account for close to half of the energy use

102

An assessment of the value of retail ready packaging  

E-Print Network [OSTI]

Use of retail-ready packaging reduces the costs of replenishing store shelves by eliminating the labor of removing packaging materials and stocking individual items on shelves. While reducing costs for retailers, retail-ready ...

Jackson, Kathleen Anne

2008-01-01T23:59:59.000Z

103

Building America Top Innovations 2013 Profile - Zero Energy-Ready...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Top Innovations 2013 Profile - Zero Energy-Ready Single-Family Homes Building America Top Innovations 2013 Profile - Zero Energy-Ready Single-Family Homes Many Building America...

104

DOE Zero Energy Ready Home Case Study: Mandalay Homes, Prescott...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Study: Mandalay Homes, Prescott Valley, AZ DOE Zero Energy Ready Home Case Study: Mandalay Homes, Prescott Valley, AZ Case study of a DOE Zero Energy Ready home in northern AZ that...

105

ZERH Webinar: Sales and Value Recognition of Zero Energy Ready...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ZERH Webinar: Sales and Value Recognition of Zero Energy Ready Homes ZERH Webinar: Sales and Value Recognition of Zero Energy Ready Homes December 18, 2014 12:00PM to 1:15PM EST...

106

DOE Zero Energy Ready Home Case Study, Mandalay Homes, Phoenix...  

Energy Savers [EERE]

Mandalay Homes, Phoenix, AZ, Affordable DOE Zero Energy Ready Home Case Study, Mandalay Homes, Phoenix, AZ, Affordable Case study of a DOE Zero Energy Ready Home in Phoenix, AZ...

107

DOE Zero Energy Ready Home Case Study, Garbett Homes, Herriman...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Garbett Homes, Herriman, UT, Production Home DOE Zero Energy Ready Home Case Study, Garbett Homes, Herriman, UT, Production Home Case study of a DOE Zero Energy Ready Home in...

108

DOE Zero Energy Ready Home Case Study: Amerisips Homes, Charleston...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Amerisips Homes, Charleston, SC DOE Zero Energy Ready Home Case Study: Amerisips Homes, Charleston, SC Case study of a DOE Zero Energy Ready home on Johns Island in Charleston, SC,...

109

DOE Zero Energy Ready Home Case Study: Sterling Brook Custom...  

Energy Savers [EERE]

Sterling Brook Custom Homes, Double Oak, TX DOE Zero Energy Ready Home Case Study: Sterling Brook Custom Homes, Double Oak, TX Case study of a DOE Zero Energy Ready home in Double...

110

DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland...  

Energy Savers [EERE]

Cobblestone Homes, Midland, MI DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland, MI Case study of a DOE Zero Energy Ready home in Midland, MI, that scored HERS 49...

111

Perceived Readiness for Practice of Senior Baccalaureate Nursing Students  

E-Print Network [OSTI]

experiences. This mixed method study examined the psychometric properties of a readiness for practice tool, and explored the effects of a clinical internship experience on the perception of readiness for practice of 483 senior baccalaureate nursing students...

Reagor, Janet

2010-04-20T23:59:59.000Z

112

ENERGY STAR Webinar: Zero Energy Ready Home Program | Department...  

Broader source: Energy.gov (indexed) [DOE]

home is as good as ENERGY STAR, the modest added "lift" to bring a home up to DOE's Zero Energy Ready specs unleashes a wave of powerful value messages. DOE Zero Energy Ready...

113

DOE Zero Energy Ready Home Case Study: Brookside Development...  

Energy Savers [EERE]

Preferred Builders, Old Greenwich, CT, Custom DOE Zero Energy Ready Home Case Study: AquaZephyr, Ithaca, NY DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland, MI...

114

New DOE Report Investigates Port Readiness for Offshore Wind...  

Energy Savers [EERE]

New DOE Report Investigates Port Readiness for Offshore Wind New DOE Report Investigates Port Readiness for Offshore Wind October 1, 2013 - 1:22pm Addthis This is an excerpt from...

115

DOE Zero Energy Ready Home Case Study: Greenhill Contracting...  

Energy Savers [EERE]

Study: Greenhill Contracting, New Paltz, NY DOE Zero Energy Ready Home Case Study: Greenhill Contracting, New Paltz, NY Case study of a DOE Zero Energy Ready home in New Paltz, NY,...

116

Zero Energy Ready Home Events | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Zero Energy Ready Home Events Zero Energy Ready Home Events February 2015 < prev next > Sun Mon Tue Wed Thu Fri Sat 1 2 3 4 5 6 7 ZERH Webinar: High-Performance Home Sales Training...

117

DOE Zero Energy Ready Home Case Study, Caldwell and Johnson,...  

Office of Environmental Management (EM)

Study, Caldwell and Johnson, Exeter, RI, Custom Home DOE Zero Energy Ready Home Case Study, Caldwell and Johnson, Exeter, RI, Custom Home Case study of a DOE Zero Energy Ready Home...

118

Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 2 (CDP)  

Broader source: Energy.gov (indexed) [DOE]

PRELIMINARY TECHNOLOGY PRELIMINARY TECHNOLOGY OF THE CALCINE Prepared by the U.S. Department of Energy ECHNOLOGY READINESS ASSESSMENT ALCINE DISPOSITION PROJECT VOLUME TWO Anthony F. Kluk Hoyt C. Johnson Clyde Phillip McGinnis Michael Rinker Steven L. Ross Herbert G. Sutter John Vienna February 2011 Prepared by the U.S. Department of Energy Washington, DC SSESSMENT ROJECT 412.09 (06/03/2009 - Rev. 11) CALCINE DISPOSITION PROJECT TECHNOLOGY MATURATION PLAN Identifier: Revision*: Page: PLN-1482 2 C-1 of C-317 Appendix C Appendix C Checklists for Critical Technology Elements and Technology Readiness Levels This appendix provides the CTE and TRL checklists for the CTEs. For the TRL questions that receive a "Y" (yes) response, the supporting documentation is provided with a complete reference at the

119

DOE Zero Energy Ready Home National Program Requirements (Rev. 04)  

Broader source: Energy.gov [DOE]

U.S. Department of Energy Zero Energy Ready Home National Program Requirements (Rev. 04), April 21, 2014.

120

Is Vietnam Ready for Nuclear Power?  

Science Journals Connector (OSTI)

Is Vietnam Ready for Nuclear Power? ... Currently the worlds largest nuclear power market exists in emerging economies and developing countries as those countries are in great need of relatively cheap energy to drive its economic growth. ... But nuclear power, neither cheap nor safe, is putting those countries in a dilemma. ...

Changjian Wang; Qiang Wang; Fei Wang

2012-04-27T23:59:59.000Z

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Shale oil processes ready for commercialization  

Science Journals Connector (OSTI)

Shale oil processes ready for commercialization ... However, Lurgi has been in the shale processing business by itself since the 1930s, and hopes to capitalize on this experience. ... Lurgi developed the Lurgi-Ruhrgas (LR) process in concert with Ruhrgas with an eye on the U.S. shale oil markets of the future. ...

1982-04-12T23:59:59.000Z

122

Global e-Readiness - For What? Readiness for e-Banking (JITD)  

E-Print Network [OSTI]

With the rapid diffusion of the Internet worldwide, there has been considerable interest in the e-potentials of developing countries giving rise to a 1st generation of e-Readiness studies. Moreover, ...

Maugis, V.

2004-12-10T23:59:59.000Z

123

Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Ethiopia UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1]

124

UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) | Open  

Open Energy Info (EERE)

UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Name UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

125

Facilitating Implementation and Readiness for Mitigation (FIRM) | Open  

Open Energy Info (EERE)

Facilitating Implementation and Readiness for Mitigation (FIRM) Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Name UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Costa Rica, Ethiopia, Ghana, Indonesia, Mexico, Morocco, Senegal, South Africa, Vietnam UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1]

126

Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM)  

Open Energy Info (EERE)

Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM) Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Costa Rica UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1]

127

South Africa-Facilitating Implementation and Readiness for Mitigation  

Open Energy Info (EERE)

South Africa-Facilitating Implementation and Readiness for Mitigation South Africa-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: South Africa-Facilitating Implementation and Readiness for Mitigation (FIRM) Name South Africa-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country South Africa UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1]

128

Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Events Events Printable Version Share this resource Send a link to Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop to someone by E-mail Share Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Facebook Tweet about Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Twitter Bookmark Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Google Bookmark Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Delicious Rank Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Digg Find More places to share Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on AddThis.com... Conferences & Workshops

129

Hydrogen Infrastructure Market Readiness Workshop: Preliminary Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hydrogen Infrastructure Market Readiness Hydrogen Infrastructure Market Readiness Workshop: Preliminary Results Marc Melaina, PhD Hydrogen Technologies and Systems Center, NREL Distributed electronically to workshop attendees for review March 24, 2011 Goal of this presentation * This presentation is being disseminated to workshop attendees to convey the aggregate and "raw" feedback collected during the workshop * This feedback will be compiled in a final report * We would like to accomplish two things with these slides: 1. Share the preliminary results with participants 2. Get your feedback now on any corrections or omissions * We are still open to receiving additional feedback on the workshop topic, but will report it as having been received outside of the workshop if it is included in the final report

130

NGNP Infrastructure Readiness Assessment: Consolidation Report  

SciTech Connect (OSTI)

The Next Generation Nuclear Plant (NGNP) project supports the development, demonstration, and deployment of high temperature gas-cooled reactors (HTGRs). The NGNP project is being reviewed by the Nuclear Energy Advisory Council (NEAC) to provide input to the DOE, who will make a recommendation to the Secretary of Energy, whether or not to continue with Phase 2 of the NGNP project. The NEAC review will be based on, in part, the infrastructure readiness assessment, which is an assessment of industry's current ability to provide specified components for the FOAK NGNP, meet quality assurance requirements, transport components, have the necessary workforce in place, and have the necessary construction capabilities. AREVA and Westinghouse were contracted to perform independent assessments of industry's capabilities because of their experience with nuclear supply chains, which is a result of their experiences with the EPR and AP-1000 reactors. Both vendors produced infrastructure readiness assessment reports that identified key components and categorized these components into three groups based on their ability to be deployed in the FOAK plant. The NGNP project has several programs that are developing key components and capabilities. For these components, the NGNP project have provided input to properly assess the infrastructure readiness for these components.

Brian K Castle

2011-02-01T23:59:59.000Z

131

Joint Actinide Shock Physics Experimental Research Facility Restart Operational Readiness Review Pre- Visit  

Broader source: Energy.gov (indexed) [DOE]

NNSS-2011-04-28 NNSS-2011-04-28 Site: Nevada National Security Site Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Joint Actinide Shock Physics Experimental Research Facility Restart Operational Readiness Review Pre- Visit Dates of Activity: 04/25/2011 - 04/28/2011 Report Preparer William Macon Activity Description/Purpose: In coordination with the National Nuclear Security Administration (NNSA) Service Center, the Office of Health, Safety and Security (HSS) site lead participated in a pre-visit for the NNSA Operational Readiness Review (ORR) of the Joint Actinide Shock Physics Experimental Research (JASPER) facility restart conducted April 25-28, 2011. The site lead also participated

132

DOE handbook: Guide to good practices for operational readiness reviews (ORR) team leader`s guide  

SciTech Connect (OSTI)

This guidance section provides instructions, explanations and examples for the performance of all phases of an Operational Readiness Review (ORR). Details pertinent to the Team Leader (TL), Team Members (TM) and Review Coordinator (RC) are outlined. An appendix contains sample forms and correspondence which are typically used to initiate and perform the ORR. Although this document was written specifically for use by DOE ORR Team Leaders, its use may also be beneficial to contractor ORR Team Leaders. The handbook is also useful for Team Leaders of Readiness Assessments conducted in accordance with requirements of DOE O 425.1. Lessons learned, which are promulgated with this handbook, will benefit any line manager, particularly those preparing a facility or process for startup or restart.

NONE

1994-09-01T23:59:59.000Z

133

Certified Sites (Ready! Set! Build!) (Wisconsin) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Certified Sites (Ready! Set! Build!) (Wisconsin) Certified Sites (Ready! Set! Build!) (Wisconsin) Certified Sites (Ready! Set! Build!) (Wisconsin) < Back Eligibility Agricultural Developer General Public/Consumer Institutional Low-Income Residential Nonprofit Residential Rural Electric Cooperative Schools State/Provincial Govt Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Wisconsin Program Type Training/Technical Assistance Siting and Permitting Provider Wisconsin Economic Development Corporation WEDC has created, in partnership with Deloitte Consulting (Site Selector Consultant) and community partners, the Ready! Set! Build! Program, which provides consistent standards for industrial site certification in

134

The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

for Market Readiness (PMR) for Market Readiness (PMR) Jump to: navigation, search Logo: The World Bank Partnership for Market Readiness (PMR) - Brazil Name The World Bank Partnership for Market Readiness (PMR) - Brazil Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs Website http://wbcarbonfinance.org/Rou

135

Jasper Johns in der Nachfolge des Ready-mades.  

E-Print Network [OSTI]

??Die Arbeit untersucht, wie die Einfhrung des Ready-mades in die Kunstwelt die Arbeitsweise von Knstlern sowie die Produktion und Wahrnehmung von Kunstwerken beeinflusst hat. Dies (more)

Mayer, Lynette Mildred

2013-01-01T23:59:59.000Z

136

Accelerating the Electrification of U.S. Drive Trains: Ready...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

More Documents & Publications Accelerating the Electrification of U.S. Drive Trains: Ready and Affordable Technology Solutions for Domestically Manufactured Advanced...

137

Readiness Review Training - Development of Criteria And Review...  

Broader source: Energy.gov (indexed) [DOE]

Documents November 8-9, 2010 Readiness Review Training - Development of Criteria And Review Approach Documents Topics include: Implementation Plan IP Approval Content of IP IP...

138

Richmond Electric Vehicle Initiative Electric Vehicle Readiness Plan  

Broader source: Energy.gov [DOE]

The REVi plan addresses the electric vehicle market in Richmond and then addresses a regional plan, policies, and analysis of the the communities readiness.

139

DOE Zero Energy Ready Home Case Study: Southern Homes, Russellville...  

Energy Savers [EERE]

Southern Homes, Russellville, AL DOE Zero Energy Ready Home Case Study: Southern Homes, Russellville, AL Case study of the first manufactured home built to the DOE Zero Energy...

140

Zero Energy Ready Home - 2014 BTO Peer Review | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Zero Energy Ready program, formerly known as the DOE Challenge Home program, is to transform the housing market to high-performance homes. These homes are extremely energy...

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

DOE Zero Ready Home Case Study: Cobblestone Homes, 2014 Model...  

Energy Savers [EERE]

designed in to give you superior construction, durability, and comfort; healthy indoor air; high-performance HVAC, lighting, and appliances; and solar-ready components for low...

142

EV Community Readiness projects: American Lung Association of...  

Broader source: Energy.gov (indexed) [DOE]

and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting ti027kelly2013o.pdf More Documents & Publications EV Community Readiness projects: Center for...

143

Communities Plug In To Electric Vehicle Readiness | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

electric vehicle readiness projects from throughout the country. | Photo by Ken Kelly, National Renewable Energy Laboratory EV Everywhere: 10 Ways Communities Can Pave the...

144

Colorado Community Readiness Efforts for PEVs Support State Policy...  

Energy Savers [EERE]

electric vehicle readiness projects from throughout the country. | Photo by Ken Kelly, National Renewable Energy Laboratory EV Everywhere: 10 Ways Communities Can Pave the...

145

EV Community Readiness projects: Clean Energy Coalition (MI)...  

Broader source: Energy.gov (indexed) [DOE]

Clean Energy Coalition (MI); Clean Fuels Ohio EV Community Readiness projects: Clean Energy Coalition (MI); Clean Fuels Ohio 2013 DOE Hydrogen and Fuel Cells Program and Vehicle...

146

EV Community Readiness projects: Delaware Valley Regional Planning...  

Broader source: Energy.gov (indexed) [DOE]

Delaware Valley Regional Planning Commission (PA); Metropolitan Energy Information Center, Inc. (KS, MO) EV Community Readiness projects: Delaware Valley Regional Planning...

147

DOE Zero Energy Ready Home Case Study: Southern Energy Homes...  

Office of Environmental Management (EM)

Southern Energy Homes, Russellville, AL DOE Zero Energy Ready Home Case Study: Southern Energy Homes, Russellville, AL Case study of the first manufactured home built to the DOE...

148

DOE Zero Energy Ready Home Webinar: Building Energy Optimization...  

Broader source: Energy.gov (indexed) [DOE]

Building Energy Optimization (BEopt) Software DOE Zero Energy Ready Home Webinar: Building Energy Optimization (BEopt) Software This webinar was presented on May 15, 2014 and gives...

149

Technology Readiness Assessment (TRA)/Technology Maturation Plan...  

Broader source: Energy.gov (indexed) [DOE]

(TRA)Technology Maturation Plan (TMP) Process Guide Technology Readiness Assessment (TRA)Technology Maturation Plan (TMP) Process Guide This document is a guide for those...

150

Preliminary Technology Readiness Assessment (TRA) for the Calcine...  

Office of Environmental Management (EM)

2 (CDP) Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 2 (CDP) Full Document and Summary Versions are available for download...

151

Guidelines for Participating in the DOE Zero Energy Ready Home...  

Broader source: Energy.gov (indexed) [DOE]

builders for their leadership in increasing energy efficiency, improving indoor air quality, and making homes zero energy ready. The program builds upon the comprehensive...

152

Building America Zero Energy Ready Home Case Study: Imery Group...  

Broader source: Energy.gov (indexed) [DOE]

Imery Group, Proud Green Home, Serenbe GA Building America Zero Energy Ready Home Case Study: Imery Group, Proud Green Home, Serenbe GA Case study describing the first...

153

EV Community Readiness projects: Clean Energy Coalition (MI...  

Broader source: Energy.gov (indexed) [DOE]

link the Michigan PEV Community Readiness Plan to relevant websites and other appropriate media outlets; incorporate the Plan into the PEV Taskforce website. Clean Cities Recovery...

154

DOE Zero Energy Ready Home: Better Business for Builders Webinar...  

Broader source: Energy.gov (indexed) [DOE]

Better Business for Builders Webinar Transcript DOE Zero Energy Ready Home: Better Business for Builders Webinar Transcript Below is the text version of the webinar, DOE Zero...

155

South Africa-Facilitating Implementation and Readiness for Mitigation...  

Open Energy Info (EERE)

and Readiness for Mitigation (FIRM)" Retrieved from "http:en.openei.orgwindex.php?titleSouthAfrica-FacilitatingImplementationandReadinessforMitigation(FIRM)&oldid70000...

156

Readiness Issues for Emergency Response Instrumentation  

SciTech Connect (OSTI)

Issues in maintaining readiness of instruments for deployment and use in emergency response situation often differ from those in maintaining instruments for normal operations. Confunding circumstances include use of non-availability of check sources, ensuring instruments are always in calibration and operable, possible use of instruments in different climates, packaging of instrumentation for deployment, transport of instrumentation and check sources, and ensuring users are familiar with instruments. Methods and procedures for addressing these issues are presented. Instrumentation used for survey, in situ measurements, electronic dosimetry, and air conditioning are discussed.

C.A. Riland; D.R. Bowman; R.J. Tighe

1999-03-01T23:59:59.000Z

157

Is Your Community Ready for Economic Development?  

E-Print Network [OSTI]

A critical step in initiating or facilitating an effective economic development project is to determine if the community is actually prepared to take on such a difficult task. This publication can help community leaders determine how "prepared a...

Saldana, Luis

2003-03-30T23:59:59.000Z

158

SCS-2005-18 Roundup Ready Flex Cotton System  

E-Print Network [OSTI]

SCS-2005-18 6-05 Roundup Ready Flex Cotton System Robert Lemon, Ph.D., Professor and Extension Agronomist - Cotton Randy Boman, Ph.D., Associate Professor and Extension Agronomist - Cotton Todd Baughman Specialist Peter Dotray, Ph.D., Professor and Extension Weed Specialist R oundup Ready Flex cotton provides

Mukhtar, Saqib

159

Designing and Building Houses that are Solar Ready  

Broader source: Energy.gov [DOE]

Builders considering adding photovoltaic (PV) systems to new houses after initial construction is completed can save time and money by following new house Solar Ready design guidelines. Solar Ready houses are designed and built with integrated electrical and mechanical features that streamline the integration of PV systems.

160

Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Morocco UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

EM Performs Tenth Technology Readiness Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Performs Tenth Technology Readiness Assessment Performs Tenth Technology Readiness Assessment EM Performs Tenth Technology Readiness Assessment January 31, 2012 - 12:00pm Addthis Employees with Savannah River Remediation, the SRS liquid waste contractor, review mock-ups of the SCIX technology at the Savannah River National Laboratory. Employees with Savannah River Remediation, the SRS liquid waste contractor, review mock-ups of the SCIX technology at the Savannah River National Laboratory. WASHINGTON, D.C. - EM recently completed its tenth Technology Readiness Assessment (TRA) since piloting the TRA process in 2006. A TRA is an intensive peer review process through which the maturity of a technology is evaluated. A TRA utilizes the Technology Readiness Level (TRL) scale pioneered by the National Aeronautics and Space Administration

162

Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Vietnam UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

163

EM Performs Tenth Technology Readiness Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EM Performs Tenth Technology Readiness Assessment EM Performs Tenth Technology Readiness Assessment EM Performs Tenth Technology Readiness Assessment January 31, 2012 - 12:00pm Addthis Employees with Savannah River Remediation, the SRS liquid waste contractor, review mock-ups of the SCIX technology at the Savannah River National Laboratory. Employees with Savannah River Remediation, the SRS liquid waste contractor, review mock-ups of the SCIX technology at the Savannah River National Laboratory. WASHINGTON, D.C. - EM recently completed its tenth Technology Readiness Assessment (TRA) since piloting the TRA process in 2006. A TRA is an intensive peer review process through which the maturity of a technology is evaluated. A TRA utilizes the Technology Readiness Level (TRL) scale pioneered by the National Aeronautics and Space Administration

164

What's Your PEV Readiness Score? | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

What's Your PEV Readiness Score? What's Your PEV Readiness Score? What's Your PEV Readiness Score? February 14, 2013 - 10:30am Addthis PEV readiness is a community-wide effort that requires charging infrastructure, planning, regulations and support services. The new PEV Scorecard helps communities determine their PEV friendliness. | Photo courtesy of IKEA Orlando. PEV readiness is a community-wide effort that requires charging infrastructure, planning, regulations and support services. The new PEV Scorecard helps communities determine their PEV friendliness. | Photo courtesy of IKEA Orlando. Shannon Brescher Shea Communications Manager, Clean Cities Program What does this project do? Clean Cities works to reduce U.S. reliance on petroleum in transportation by establishing local coalitions of public- and

165

Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Ghana UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

166

Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Mexico UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

167

Rough and Ready Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

and Ready Biomass Facility and Ready Biomass Facility Jump to: navigation, search Name Rough and Ready Biomass Facility Facility Rough and Ready Sector Biomass Owner Rough and Ready Lumber Co. Location Cave Junction, Oregon Coordinates 42.1628912°, -123.6481235° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.1628912,"lon":-123.6481235,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

168

DOE Zero Energy Ready Home Case Study: M Street Homes, Houston...  

Office of Environmental Management (EM)

Midland, MI DOE Zero Energy Ready Home Case Study, Mandalay Homes, Phoenix, AZ, Affordable DOE Zero Energy Ready Home Case Study, Caldwell and Johnson, Exeter, RI, Custom Home...

169

Addiction treatment centers' progress in preparing for health care reform  

Science Journals Connector (OSTI)

Abstract The Patient Protection and Affordable Care Act (PPACA) is expected to significantly alter addiction treatment service delivery. Researchers designed the Health Reform Readiness Index (HRRI) for addiction treatment organizations to assess their readiness for the PPACA. Four-hundred twenty-seven organizations completed the HRRI throughout a 3-year period, using a four-point scale to rank their readiness on 13 conditions. HRRI results completed during two different time periods (between 10/1/20106/30/2011 and 9/1/20119/30/2012) were analyzed and compared. Most respondents self-assessed as being in the early stages of preparation for 9 of the 13 conditions. Survey results showed that organizations with annual budgets$5 million (n=132). The HRRI results suggest that the addiction field, and in particular smaller organizations, is not preparing adequately for health care reform; organizations that are making preparations are making only modest gains.

Todd D. Molfenter

2014-01-01T23:59:59.000Z

170

Implementation Proposal for  

Broader source: Energy.gov (indexed) [DOE]

Implementation Proposal for Implementation Proposal for The National Action Plan on Demand Response Report to Congress Prepared by staff of the Federal Energy Regulatory Commission and the U.S. Department of Energy The opinions and views expressed in this staff report do not necessarily represent those of the Federal Energy Regulatory Commission, its Chairman, or individual Commissioners, and are not binding on the Commission. Implementation Proposal for The National Action Plan on Demand Response July 2011 TABLE OF CONTENTS Executive Summary ............................................................................................... iii I. Introduction ......................................................................................................1

171

Global e-readiness of web sites: a look at the top 50 companies  

Science Journals Connector (OSTI)

Today the globalisation of markets and the blurring of country borders leave no option for companies to contemplate whether they should go global. Even when their intended strategy is to be domestic, the changing competitive landscape forces them to take a global perspective. This scenario is further compounded by the fact that customers now come from all over the world through a relatively inexpensive channel ?? the Internet. Thus, what were once considered to be a purely domestic company is now being increasingly drawn into a global market due to the Internet. Hence the central question that one needs to ask is, ''Are companies gearing themselves to meet this need?'' and, if so ''Do their Web sites reflect such a strategy?'' In other words what is the global e-readiness of Web sites of so called ''big multinational corporations?'' This paper reviews the relevant literature on e-readiness and applies proposed typology to measure the e-readiness of Web sites of the top 50 global companies. Implications of this exploratory research are discussed from a managerial perspective.

Mahesh S. Raisinghani; Sri Beldona

2003-01-01T23:59:59.000Z

172

Proposal Process  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Testbed Results Current Testbed Research Proposal Process Terms and Conditions Dark Fiber Testbed Performance (perfSONAR) Software & Tools Development Partnerships...

173

Property:Technology Readiness Level | Open Energy Information  

Open Energy Info (EERE)

Readiness Level Readiness Level Jump to: navigation, search Property Name Technology Readiness Level Property Type Text Pages using the property "Technology Readiness Level" Showing 25 pages using this property. (previous 25) (next 25) M MHK Technologies/14 MW OTECPOWER + TRL 5 6 System Integration and Technology Laboratory Demonstration MHK Technologies/Aegir Dynamo + TRL 5 6 System Integration and Technology Laboratory Demonstration MHK Technologies/AirWEC + TRL 5/6: System Integration and Technology Laboratory Demonstration MHK Technologies/Anaconda bulge tube drives turbine + TRL 4 Proof of Concept MHK Technologies/AquaBuoy + TRL 1-3: Discovery / Concept Definition / Early Stage Development & Design & Engineering MHK Technologies/Aquantis + TRL 1 3 Discovery Concept Def Early Stage Dev Design Engineering

174

Energy Department Staff Ready for Hurricane Earl | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy Department Staff Ready for Hurricane Earl Energy Department Staff Ready for Hurricane Earl Energy Department Staff Ready for Hurricane Earl September 3, 2010 - 12:00pm Addthis Patricia A. Hoffman Patricia A. Hoffman Assistant Secretary, Office of Electricity Delivery & Energy Reliability What does this mean for me? You can review updated information on the Energy Department's response efforts, including critical energy infrastructure impacted by the storm and outage and restoration data, through the Emergency Situation Reports. As Category 4 Hurricane Earl heads towards the East Coast, Energy Department emergency responders are in place and ready to go at the National Response Coordination Center in Washington, D.C. and FEMA's Regional Response Coordination Centers in Boston and New York City. The

175

DOE Zero Energy Ready Home: Ventilation and Filtration Strategies...  

Broader source: Energy.gov (indexed) [DOE]

We have these homes so well-air-sealed, we need to look at things like good source control products. Obviously, these homes are so efficient, they're zero energy ready, we have...

176

Are Batteries Ready for Plug-in Hybrid Buyers?  

E-Print Network [OSTI]

237253. Burke, A. , 2007. Batteries and ultracapacitors forresults with lithium-ion batteries. In: Proceedings (CD)locate/tranpol Are batteries ready for plug-in hybrid

Axsen, Jonn; Burke, Andy; Kurani, Kenneth S

2010-01-01T23:59:59.000Z

177

Making existing production systems Industry 4.0-ready  

Science Journals Connector (OSTI)

This paper presents an approach to how existing production systems that are not Industry 4.0-ready can be expanded to participate in an Industry 4.0 factory. Within this paper, a concept ... systems can be discov...

Jan Schlechtendahl; Matthias Keinert; Felix Kretschmer

2014-10-01T23:59:59.000Z

178

DOE Zero Energy Ready Home Webinar: Ducts in Conditioned Space  

Broader source: Energy.gov [DOE]

DOE Challenge Home is a blueprint for zero energy ready homes. When we make that statement its impossible to justify huge thermal losses from ducts in unconditioned spaces. Thats why one of...

179

EV Community Readiness projects: New York City and Lower Hudson...  

Broader source: Energy.gov (indexed) [DOE]

EV Community Readiness projects: New York City and Lower Hudson Valley Clean Communities, Inc. (NY, MA, PA); NYSERDA (ME, NH, VT, MA, RI, CT, NY, NJ, PA, DE, MD, DC) EV Community...

180

DOE Zero Ready Home Case Study: Greenhill Contracting, The Preserve...  

Energy Savers [EERE]

Greenhill Contracting The Preserve New Paltz, NY DOE ZERO ENERGY READY HOME(tm) The U.S. Department of Energy invites home builders across the country to meet the extraordinary...

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

DOE Zero Energy Ready Home: Leganza Residence- Greenbank, Washington  

Broader source: Energy.gov [DOE]

This DOE Zero Energy Ready Home features structural insulated panel walls and roof, a 2-ton ground source heat pump, radiant floor heat, 7.1 kWh PV, and triple-pane windows.

182

Marketing and Sales Solutions for Zero Energy Ready Homes Webinar...  

Broader source: Energy.gov (indexed) [DOE]

of resources that we'll cover. The first are marketing resources that deal with the brand of Zero Energy Ready Home and how it was configured from the very beginning to...

183

Webinar: Marketing and Sales Solutions for Zero Energy Ready Homes  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy Zero Energy Ready Home (ZERH) Program represents a whole new level of home performance, with rigorous requirements that ensure outstanding levels of energy savings,...

184

DOE Zero Energy Ready Home: Durable Energy Builders, Houston, Texas  

Broader source: Energy.gov [DOE]

This DOE Zero Energy Ready Home features super-insulated roof, 11,500 gallon rainwater cistern to supply most of the homes drinking water, hurricane-proof roof, and triple-pane windows.

185

DOE Zero Energy Ready Home Case Study: Green Extreme Homes &...  

Energy Savers [EERE]

Green Extreme Homes & Carl Franklin Homes, Garland, TX DOE Zero Energy Ready Home Case Study: Green Extreme Homes & Carl Franklin Homes, Garland, TX Case study of a DOE Zero Energy...

186

DOE Zero Energy Ready Home: Durable Energy Builders, Houston...  

Energy Savers [EERE]

super-insulated roof, 11,500 gallon rainwater cistern to supply most of the home's drinking water, hurricane-proof roof, and triple-pane windows. DOE Zero Energy Ready Home:...

187

Ghana-REDD Readiness Requires Radical Reform | Open Energy Information  

Open Energy Info (EERE)

Readiness Requires Radical Reform Readiness Requires Radical Reform Jump to: navigation, search Name Ghana-REDD Readiness Requires Radical Reform Agency/Company /Organization UN-REDD Programme Sector Land Focus Area Forestry, Agriculture Topics Implementation, GHG inventory, Policies/deployment programs, Resource assessment, Pathways analysis, Background analysis Resource Type Maps, Guide/manual, Training materials Website http://environment.yale.edu/tf Country Ghana UN Region Western Africa References Ghana-REDD Readiness[1] Summary "The fundamental changes needed for sustainable forest management in Ghana have been known for years, and many large projects have been instigated accordingly. Yet real change has proved elusive. The key challenge now is to get REDD-plus right so that it makes a difference. Dialogue participants

188

Unsolicited Proposals  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order sets forth Department of Energy (DOE) requirements and responsibilities for the receipt, processing, and review of unsolicited proposals (USPs). To ensure that those submitting USPs are notified in a timely manner of the status (e.g., pending, accepted for funding, or declined) of their proposals. Cancels DOE O 542.2. Certified 12-28-06.

2002-02-27T23:59:59.000Z

189

Unsolicited Proposals  

Broader source: Energy.gov [DOE]

The Department of Energy's (DOEs) central point of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory (NETL) which includes all DOE Program Research Areas.

190

Conceptual Proposal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring-Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU Projects Evan Mills, Ph.D Paul Mathew, Ph.D. Lawrence Berkeley National Laboratory Berkeley, California Report Prepared for: California Energy Commission Public Interest Energy Research (PIER) Technology Demonstration Program April 2009 Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this document is believed to contain correct information, neither the United States Government nor any agency thereof, nor The Regents of the University of California, nor any of their employees, makes any warranty, express or implied, or assumes any legal responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process

191

New Developments in the Technology Readiness Assessment Process in US DOE-EM - 13247  

SciTech Connect (OSTI)

A Technology Readiness Assessment (TRA) is a systematic, metric-based process and accompanying report that evaluates the maturity of the technologies used in systems; it is designed to measure technology maturity using the Technology Readiness Level (TRL) scale pioneered by the National Aeronautics and Space Administration (NASA) in the 1980's. More recently, DoD has adopted and provided systematic guidance for performing TRAs and determining TRLs. In 2007 the GAO recommended that the DOE adopt the NASA/DoD methodology for evaluating technology maturity. Earlier, in 2006-2007, DOE-EM had conducted pilot TRAs on a number of projects at Hanford and Savannah River. In March 2008, DOE-EM issued a process guide, which established TRAs as an integral part of DOE-EM's Project Management Critical Decision Process. Since the development of its detailed TRA guidance in 2008, DOE-EM has continued to accumulate experience in the conduct of TRAs and the process for evaluating technology maturity. DOE has developed guidance on TRAs applicable department-wide. DOE-EM's experience with the TRA process, the evaluations that led to recently developed proposed revisions to the DOE-EM TRA/TMP Guide; the content of the proposed changes that incorporate the above lessons learned and insights are described. (authors)

Krahn, Steven [Department of Civil and Environmental Engineering, Vanderbilt University, Nashville, TN, 37235 (United States)] [Department of Civil and Environmental Engineering, Vanderbilt University, Nashville, TN, 37235 (United States); Sutter, Herbert [Consultant, 910 Laurel Green Dr., North Canton, OH, 44720 (United States)] [Consultant, 910 Laurel Green Dr., North Canton, OH, 44720 (United States); Johnson, Hoyt [DOE-EM, 1000 Independence Ave., Washington, DC, 20585 (United States)] [DOE-EM, 1000 Independence Ave., Washington, DC, 20585 (United States)

2013-07-01T23:59:59.000Z

192

Ready to Retrofit: The Process of Project Team Selection, Building  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ready to Retrofit: The Process of Project Team Selection, Building Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects Title Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects Publication Type Report LBNL Report Number LBNL-5893E Year of Publication 2012 Authors Sanders, Mark D., Kristen Parrish, and Paul A. Mathew Publisher LBNL Abstract This guide provides an introduction and overview to the retrofit process and then dives deeper into the key activities that an owner can influence most in the retrofit process: (1) Selecting Your Project Team, (2) Benchmarking Your Building, and (3) Financing Your Energy Efficiency Projects* Building Energy Retrofit Overview will provide you a simple explanation of the retrofit process, the project stages and the players involved.

193

LEDs Ready for Takeoff at Louisiana Airport | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

LEDs Ready for Takeoff at Louisiana Airport LEDs Ready for Takeoff at Louisiana Airport LEDs Ready for Takeoff at Louisiana Airport July 14, 2010 - 3:34pm Addthis Hammond, La., airport is replacing the existing incandescent taxiway lights (pictured) with LEDs. | Photo courtesy of Hammond Northshore Regional Airport Hammond, La., airport is replacing the existing incandescent taxiway lights (pictured) with LEDs. | Photo courtesy of Hammond Northshore Regional Airport Stephen Graff Former Writer & editor for Energy Empowers, EERE What are the key facts? Upgrades for safety, energy at Hammond airport possible through Recovery Act Taxiway lights to be replaced with LEDs Airport could save up to $15,000 annually on electric bills Energy efficiency is taking off at the airport in Hammond, La., about 70

194

Fast pandemic detection tool ready to fight flu  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fast pandemic detection tool ready to fight flu Fast pandemic detection tool ready to fight flu Fast pandemic detection tool ready to fight flu Researchers are developing new tools for rapidly characterizing biological pathogens that could give rise to potentially deadly pandemics such as Influenza A (H1N1). June 9, 2009 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

195

Launching Apps for Energy! Developers, Are You Ready? | Department of  

Broader source: Energy.gov (indexed) [DOE]

Apps for Energy! Developers, Are You Ready? Apps for Energy! Developers, Are You Ready? Launching Apps for Energy! Developers, Are You Ready? April 5, 2012 - 4:00pm Addthis Apps for Energy is open for submissions. Sign-up at appsforenergy.challenge.gov. Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs What are the key facts? Today, the Energy Department's Apps for Energy competition is open for submissions. Apps for Energy leverages Green Button -- an open standard for sharing utility data. Developers who build the best apps win part of a $100,000 cash prize. May 15 is the last day to submit an app. To submit your app design, signup at appsforenergy.challenge.gov The Energy Department's first ever Apps for Energy competition is officially open for submissions, starting today.

196

LEDs Ready for Takeoff at Louisiana Airport | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

LEDs Ready for Takeoff at Louisiana Airport LEDs Ready for Takeoff at Louisiana Airport LEDs Ready for Takeoff at Louisiana Airport July 14, 2010 - 3:34pm Addthis Hammond, La., airport is replacing the existing incandescent taxiway lights (pictured) with LEDs. | Photo courtesy of Hammond Northshore Regional Airport Hammond, La., airport is replacing the existing incandescent taxiway lights (pictured) with LEDs. | Photo courtesy of Hammond Northshore Regional Airport Stephen Graff Former Writer & editor for Energy Empowers, EERE What are the key facts? Upgrades for safety, energy at Hammond airport possible through Recovery Act Taxiway lights to be replaced with LEDs Airport could save up to $15,000 annually on electric bills Energy efficiency is taking off at the airport in Hammond, La., about 70

197

UNDP Readiness for Climate Finance | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » UNDP Readiness for Climate Finance Jump to: navigation, search Tool Summary Name: UNDP Readiness for Climate Finance Agency/Company /Organization: United Nations Development Programme (UNDP) Sector: Climate Focus Area: Renewable Energy Phase: Evaluate Options Topics: Co-benefits assessment, - Energy Access, Finance, Low emission development planning, -LEDS Resource Type: Guide/manual, Publications Website: www.undp.org/content/undp/en/home/librarypage/environment-energy/low_e Cost: Free Language: English The paper presents a framework for understanding what it means to be "ready" to use climate finance in a transformative way at the national level. In the context of the financial challenges posed by climate change,

198

Are You Ready to Make a Difference? | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Are You Ready to Make a Difference? Are You Ready to Make a Difference? Are You Ready to Make a Difference? September 27, 2010 - 2:23pm Addthis Secretary of Energy Steven Chu talks about the influence of his physics teacher. John Schueler John Schueler Former New Media Specialist, Office of Public Affairs Providing America's students with a quality education is essential to ensuring that we can continue to be leaders of innovation and industry, and we can't fulfill that responsibility without quality teachers. There is already a great need for skilled math and science teachers and with many of the most accomplished educators approaching retirement age, the demand for specialists in those fields will only grow in the coming years. That's why public figures like Secretary Chu are sharing the personal impact that

199

Energy Department Emergency Response Team Ready to Respond to Hurricane  

Broader source: Energy.gov (indexed) [DOE]

Department Emergency Response Team Ready to Respond to Department Emergency Response Team Ready to Respond to Hurricane Irene Energy Department Emergency Response Team Ready to Respond to Hurricane Irene August 26, 2011 - 12:15pm Addthis Hurricane Irene made landfall at approximately 7:30 am EDT near Cape Lookout, North Carolina with maximum sustained winds of 85 mph (Category 1). This NOAA GOES-13 satellite image captures Irene’s landfall moment. | Image courtesy of NOAA Hurricane Irene made landfall at approximately 7:30 am EDT near Cape Lookout, North Carolina with maximum sustained winds of 85 mph (Category 1). This NOAA GOES-13 satellite image captures Irene's landfall moment. | Image courtesy of NOAA Patricia A. Hoffman Patricia A. Hoffman Assistant Secretary, Office of Electricity Delivery & Energy Reliability

200

Tank Waste Feed Delivery System Readiness at the Hanford Site  

Broader source: Energy.gov (indexed) [DOE]

Audit Report Audit Report Tank Waste Feed Delivery System Readiness at the Hanford Site OAS-L-12-09 August 2012 Department of Energy Washington, DC 20585 August 23, 2012 MEMORANDUM FOR THE MANAGER, OFFICE OF RIVER PROTECTION FROM: David Sedillo, Director Western Audits Division Office of Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Tank Waste Feed Delivery System Readiness at the Hanford Site" BACKGROUND The Department of Energy's largest cleanup task involves the treatment, immobilization and disposal of 56 million gallons of hazardous and highly radioactive waste at the Hanford Site, located in Southeastern Washington State. As part of this effort, the Department is constructing

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

EMERGENCY READINESS ASSURANCE PLAN (ERAP) FOR FISCAL YEAR (FY) 2014  

SciTech Connect (OSTI)

This Emergency Readiness Assurance Plan (ERAP) for Fiscal Year (FY) 2014 in accordance with DOE O 151.1C, Comprehensive Emergency Management System. The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for FY-15. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, INL Emergency Plan/RCRA Contingency Plan.

Shane Bush

2014-09-01T23:59:59.000Z

202

Proposed Action  

E-Print Network [OSTI]

Plan and made determinations of may effect, likely to adversely affect for the Pitcher's thistle, Kirtland's warbler, bald eagle, piping plover, Karner blue butterfly, and Indiana bat. The Forest made a determination of may effect, not likely to adversely affect for designated piping plover critical habitat. September 16, 2005: The Service responded to the Forests request for formal consultation, indicating that the information received in the BA constituted a complete initiation package. September December 2005: Jessica Hogrefe (USFWS) worked with Forest biologists via email and telephone to discuss the proposed Plan and effects to listed species.

U. S. Fish; Wildlife Service

2006-01-01T23:59:59.000Z

203

Questions and Answers Alternative Fuel Readiness Plans  

E-Print Network [OSTI]

The City of Davis is considering a partnership proposal with UC Davis in response to PON-13-603. Are campus funds generated locally by the UC Davis Transportation and Parking Services through the sale of parking strategy with an equal contribution from the City and the UC Davis Transportation and Parking Services

204

Eureka: Companies ready to bid for funds  

Science Journals Connector (OSTI)

... up a study group to make joint proposals to Eureka, while the Norwegian computer company Norsk Data and the French defence, space and electronics group, Matra, announced the development ... the development of a large European super-computer to rival the Cray machines.

Robert Walgate

1985-07-04T23:59:59.000Z

205

Technology Readiness Assessment of Department of Energy Waste Processing Facilities: When is a Technology Ready for Insertion?  

SciTech Connect (OSTI)

This paper will describe a technology readiness assessment process (TRA) that the U.S. Department of Energy (DOE) piloted at Hanford's Waste Treatment and Immobilization Plant (WTP) and has subsequently applied to other projects at Hanford and the Savannah River Site. The methodology used for these TRAs was based upon detailed guidance contained in the U.S. Department of Defense (DoD), Technology Readiness Assessment Desk-book and adapted a technology readiness scale developed by the DOD and National Aeronautics and Space Administration (NASA) to the DOE. This paper will discuss the application of the TRA process to the WTP and the development of a Technology Maturation Plan (TMP) based on the TRA findings. (authors)

Alexander, D. [Department of Energy, Office of River Protection, Richland, Washington (United States); Gerdes, K. [Department of Energy, Office of Waste Processing, Germantown, Maryland (United States); Holton, L. [Pacific Northwest National Laboratory, Richland, Washington (United States); Krahn, St. [Department of Energy, Office of Waste Processing, Germantown, Maryland (United States); Sutter, H. [Consultant, Department of Energy, Office of Project Recovery, Germantown, Maryland (United States)

2008-07-01T23:59:59.000Z

206

Summary Report: Clean Cities Plug-In Electric Vehicle Community Readiness Partners Discussion Group  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2101 Wilson Blvd., Suite 550 | Arlington, VA 22201 | 703-516-4146 | www.C2ES.org 2101 Wilson Blvd., Suite 550 | Arlington, VA 22201 | 703-516-4146 | www.C2ES.org MAY 7, 2012 4:30 PM - 6:00 PM LOS ANGELES, CA SUMMARY REPORT: CLEAN CITIES PLUG-IN ELECTRIC VEHICLE COMMUNITY READINESS PARTNERS DISCUSSION GROUP By: Nick Nigro, Center for Climate and Energy Solutions An opportunity to discuss challenges and share best practices regarding efforts to prepare your community/region for plug-in electric vehicles and charging infrastructure deployment Center for Climate and Energy Solutions 2 Table of Contents Table of Contents 2 About this Report 3 Disclaimer 3 Acknowledgements 3 Session Overview 4 Vehicle Demand and Availability 4 Law and Regulatory Environment 5 Public EVSE Signage 5 ADA Compliance 7 Multi-unit Dwellings 7

207

Financing Capture Ready Coal-Fired Power Plants in China by Issuing Capture Options  

E-Print Network [OSTI]

Capture Ready is a design concept enabling fossil fuel plants to be retrofitted more economically with carbon dioxide capture and storage (CCS) technologies, however financing the cost of capture ready can be problematic, especially...

Liang, Xi; Reiner, David; Gibbons, Jon; Li, Jia

208

DOE Zero Energy Ready Home Case Study: Boulder ZED Design Build...  

Energy Savers [EERE]

Study: Boulder ZED Design Build - Boulder, Colorado DOE Zero Energy Ready Home Case Study: Boulder ZED Design Build - Boulder, Colorado Case study of a DOE Zero Energy Ready Home...

209

DOE Zero Energy Ready Home Case Study: Green Extreme Homes & Carl Franklin Homes, Garland, TX  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready affordable home in Garland, TX, that was the first retrofit home certified to the DOE Zero Energy Ready home requirements. The construction team achieved a...

210

Zero Energy-Ready Single-Family Homes - Building America Top...  

Energy Savers [EERE]

Zero Energy-Ready Single-Family Homes - Building America Top Innovation Zero Energy-Ready Single-Family Homes - Building America Top Innovation Photo of a zero-energy,...

211

DOE Zero Energy Ready Home Case Study: Clifton View Homes, Whidbey...  

Energy Savers [EERE]

Study: Clifton View Homes, Whidbey Island, WA DOE Zero Energy Ready Home Case Study: Clifton View Homes, Whidbey Island, WA Case study of a DOE Zero Energy Ready home on Whidbey...

212

DOE Zero Energy Ready Home Case Study: M Street Homes, Houston...  

Energy Savers [EERE]

Study: M Street Homes, Houston, TX DOE Zero Energy Ready Home Case Study: M Street Homes, Houston, TX Case study of a DOE Zero Energy Ready home in Houston, TX, that achieves a...

213

DOE Zero Energy Ready Home Case Study: One Sky Homes, San Jose...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

One Sky Homes, San Jose, CA DOE Zero Energy Ready Home Case Study: One Sky Homes, San Jose, CA DOE Zero Energy Ready Home Case Study: One Sky Homes, San Jose, CA Case study of a...

214

What to Expect When Readying to Move Spent Nuclear Fuel from...  

Broader source: Energy.gov (indexed) [DOE]

What to Expect When Readying to Move Spent Nuclear Fuel from Commercial Nuclear Power Plants What to Expect When Readying to Move Spent Nuclear Fuel from Commercial Nuclear Power...

215

Computer vs. Video Game System: Ready to Rumble in the #EnergyFaceoff...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Computer vs. Video Game System: Ready to Rumble in the EnergyFaceoff Jungle Computer vs. Video Game System: Ready to Rumble in the EnergyFaceoff Jungle November 4, 2014 - 10:20am...

216

DOE Zero Energy Ready Home Case Study: BPC Green Builders, Danbury...  

Energy Savers [EERE]

Study: BPC Green Builders, Danbury, CT DOE Zero Energy Ready Home Case Study: BPC Green Builders, Danbury, CT Case study of a DOE Zero Energy Ready home in Danbury, CT, that scored...

217

DOE Zero Energy Ready Home Case Study, New Town Builders, Denver...  

Office of Environmental Management (EM)

New Town Builders, Denver, CO, Production Home DOE Zero Energy Ready Home Case Study, New Town Builders, Denver, CO, Production Home Case study of a DOE Zero Energy Ready Home in...

218

DOE Zero Energy Ready Home Case Study 2013: Manatee County Habitat...  

Energy Savers [EERE]

Energy Ready Home has a 2.5-kW PV system obtained with assistance from Florida Power and Light. All of the homes in the development are solar-energy ready with conduit in place...

219

DOE Zero Energy Ready Home Case Study: BPC Green Builders, Danbury...  

Broader source: Energy.gov (indexed) [DOE]

BPC Green Builders, Danbury, CT DOE Zero Energy Ready Home Case Study: BPC Green Builders, Danbury, CT Case study of a DOE Zero Energy Ready home in Danbury, CT, that scored HERS...

220

CCSI Technology Readiness Levels Likelihood Model (TRL-LM) Users Guide  

SciTech Connect (OSTI)

This is the manual for the Carbon Capture Simulation Initiative (CCSI) Technology Readiness Level Likelihood model based on PNNL velo.

Engel, David W.; Dalton, Angela C.; Sivaramakrishnan, Chandrika; Lansing, Carina

2013-03-26T23:59:59.000Z

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

DOE Zero Energy Ready Home Case Study: Shore Road Project- Old Greenwich, Connecticut  

Broader source: Energy.gov [DOE]

This case study describes the builder Murphy Brothers' first DOE Zero Energy Ready Home in Old Greenwich, CT.

222

Quality Management Systems for Zero Energy Ready Home Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, Quality Management Systems for Zero Energy Ready Home, presented in October 2014.

223

Text-Alternative Version: ENERGY STAR for SSL: Getting Ready for September 30  

Broader source: Energy.gov [DOE]

Below is the text-alternative version of the ENERGY STAR for SSL: Getting Ready for September 30 webcast.

224

DOE Hydrogen and Fuel Cell Overview: 2011 Hydrogen Infrastructure Market Readiness Workshop  

Broader source: Energy.gov [DOE]

Presentation by Sunita Satyapal at the Hydrogen Infrastructure Market Readiness Workshop, February 16, 2011, in Washington, DC.

225

Energy Flow: A Multimodal `Ready' Indication For Electric Vehicles  

E-Print Network [OSTI]

Energy Flow: A Multimodal `Ready' Indication For Electric Vehicles Abstract The lack of sound and vibration while starting the drive system of an electric vehicle (EV) is one of the major differences the energy level to the driver. With Energy Flow (see Figure 1), we test if there will be a benefit in terms

226

Shunting passenger trains: getting ready for Marjan van den Akker  

E-Print Network [OSTI]

Shunting passenger trains: getting ready for departure Marjan van den Akker Hilbrandt Baarsma Utrecht University P.O. Box 80.089 3508 TB Utrecht The Netherlands #12;Shunting passenger trains: getting of shunting train units on a railway station. Train units arrive at and depart from the station according

Utrecht, Universiteit

227

Verification of Readiness to Start Up or Restart Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes requirements for verifying readiness for startup of new Hazard Category 1, 2, and 3 nuclear facilities, activities, and operations, and for restart of existing Hazard Category 1, 2, and 3 nuclear facilities, activities, and operations that have been shut down. Cancels DOE O 425.1C. Adm Chg 1, dated 4-2-13.

2010-04-16T23:59:59.000Z

228

AT&TConsulting HITECH Security Readiness Assessment Bundle  

E-Print Network [OSTI]

regarding the safeguarding of Protected Health Information (PHI). Approach Upon engagement with AT Rule - Administrative Safeguards (164.308) - Physical Safeguards (164.310) Benefits · Cost · Readiness Report Product Brief #12;- Technical Safeguards (164.312) - Organizational Requirements (164

Fisher, Kathleen

229

Operational Readiness Review: Savannah River Replacement Tritium Facility  

SciTech Connect (OSTI)

The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members.

Not Available

1993-02-01T23:59:59.000Z

230

DOE Zero Energy Ready Home: Montlake Modern- Seattle, Washington  

Broader source: Energy.gov [DOE]

This DOE Zero Energy Ready Home features structural insulated panel walls and roof, an air-to-water heat pump plus radiant floor heat; 100% LED lighting; filtered-fan-powered fresh air intake; triple-pane windows, and 9.7 kWh PV for electric car charging station.

231

Colorado Community Readiness Efforts for PEVs Support State Policy Development  

Office of Energy Efficiency and Renewable Energy (EERE)

Project FEVER (Fostering Electric Vehicle Expansion in the Rockies), funded by EEREs Clean Cities plug-in electric vehicle community readiness award, has supported the development of Colorado state policies to accelerate the adoption of plug-in electric vehicles (PEVs).

232

U.S. Department of Energy Technology Readiness Assessment Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide assists individuals and teams involved in conducting Technology Readiness Assessments and developing Technology Maturation Plans for the DOE capital acquisition asset projects subject to DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06. Canceled by DOE G 413.3-4A. Does not cancel other directives.

2009-10-12T23:59:59.000Z

233

DOE Zero Energy Ready Home: Leganza Residence - Greenbank, Washington...  

Energy Savers [EERE]

panel (SIPs) walls, a 10.25-inch SIPS roof, an R-20 insulated slab, a 2-ton ground source heat pump, radiant floor heat, 7.1 kWh PV, and triple-pane windows. DOE Zero Energy Ready...

234

INVESTMENT READINESS PROGRAMMES AND ACCESS TO FINANCE: A CRITICAL REVIEW OF  

E-Print Network [OSTI]

1 INVESTMENT READINESS PROGRAMMES AND ACCESS TO FINANCE: A CRITICAL REVIEW OF DESIGN ISSUES Colin.entrepreneur.strath.ac.uk #12;1 INVESTMENT READINESS PROGRAMMES AND ACCESS TO FINANCE: A CRITICAL REVIEW OF DESIGN ISSUES+ Colin are not investment ready. Their owners are unwilling to seek external equity finance and those who are willing do

Mottram, Nigel

235

X-25 Cryo-ready In-vacuum Undulator at the NSLS  

SciTech Connect (OSTI)

The existing 15-year-old hybrid wiggler at the NSLS has been replaced by a state-of-the-art, cryo-ready in-vacuum undulator optimized for a dedicated macromolecular crystallography program. The device is a 1m long, 18mm period, hybrid PM-type with a minimum operating gap of 5.6mm, and has provision for cryo-cooling to 150K. Unlike the original SPring-8 cryo-PM undulator proposal, we use a new high-remanence, high-temperature grade of NdFeB (NEOMAX 42AH with Br=1.3T and Hcj=24 kOe) that can be baked to 100 deg. C to be UHV-ready in case of cooling system failure. A novel optical gap measurement system using a LED-based product ensures gap accuracy of {+-}2 micro meter. A friction stir welding technique is used for the first time in an accelerator UHV device to minimize stress and deformation of the magnet arrays due to temperature gradients. This paper describes design issues of the device and other considerations such as magnetic measurement at low temperature.

Tanabe, Toshiya; Ablett, James; Berman, Lonny; Harder, David A.; Hulbert, Steve; Lehecka, Mike; Rakowsky, George; Skaritka, John [National Synchrotron Light Source, Brookhaven National Laboratory, Upton, NY 11973 (United States); Deyhim, Alex; Johnson, Eric; Kulesza, Joe; Waterman, Dave [Advanced Design Consulting, U.S.A, Inc., 126 Ridge Rd, PO Box 187, Lansing, NY 14882 (United States)

2007-01-19T23:59:59.000Z

236

ARM - Propose a Field Campaign  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

govCampaignsPropose a Campaign govCampaignsPropose a Campaign Schedule and Availability Preproposals now open for AMF and AAF Preproposals due 1 Feb Invited full proposals due 1 May AAF available Dec 2015 AMF1 available Apr 2016 AMF2 available early 2017 AMF3 available for guest instrumentation or intensive operational periods Forms Propose a Campaign Form Instrument Support Request (ISR) Form (Word, 89KB) Documentation Steps to Send Campaign Data to ARM Data Archive Field Campaign Guidelines (PDF, 1.1MB) Propose a Campaign : Preproposal Form Preproposals are short summaries of the proposed campaign and can originate with any scientist. Before you begin your preproposal, you should review the guidelines for submitting proposals. If you are preparing your preproposals locally on your computer, please

237

Climate Change Proposed Scoping Plan  

E-Print Network [OSTI]

Climate Change Proposed Scoping Plan a amework for change Prepared by the California Air Resources #12;CLIMATE CHANGE SCOPING PLAN State of California Air Resources Board Resolution 08-47 December 11 greenhouse gas (GHG) emissions that cause global warming; WHEREAS, the adverse impacts of climate change

238

Climate Change Proposed Scoping Plan  

E-Print Network [OSTI]

Climate Change Proposed Scoping Plan a amework for change Prepared by the California Air ResourcesBackgroundBackgroundBackground ............................................................................................................................................................................................................................................................................................................................................................................................................ 4444 1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California

239

Planning and Conduct of Operational Readiness Reviews (ORR)  

Broader source: Energy.gov (indexed) [DOE]

DOE-STD-3006-2000 DOE-STD-3006-2000 June 2000 Superseding DOE-STD-3006-95 November 1995 DOE STANDARD PLANNING AND CONDUCT OF OPERATIONAL READINESS REVIEWS (ORR) U.S. Department of Energy AREA OPER Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823 Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. DOE-STD-3006-2000 iii PLANNING AND CONDUCT OF OPERATIONAL READINESS REVIEWS (ORR)

240

Sandia National Laboratories' Readiness in Technical Base and Facilities Program  

Broader source: Energy.gov (indexed) [DOE]

Sandia National Laboratories' Sandia National Laboratories' Readiness in Technical Base and Facilities Program OAS-L-13-13 September 2013 Department of Energy Washington, DC 20585 September 5, 2013 MEMORANDUM FOR THE MANAGER, SANDIA FIELD OFFICE FROM: David Sedillo, Director Western Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Sandia National Laboratories' Readiness in Technical Base and Facilities Program" BACKGROUND The Department of Energy's (Department) Sandia National Laboratories (Sandia) is a Government-owned, contractor operated Laboratory that is part of the National Nuclear Security Administration's (NNSA) nuclear weapons complex. One of Sandia's key missions is to ensure the safety, reliability and performance of the Nation's nuclear weapons stockpile. To accomplish

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

The Valles Caldera is ready for its close-up  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

January 2013 » January 2013 » The Valles Caldera Is Ready For Its Close-up Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit The Valles Caldera is ready for its close-up The first of three documentaries on the Valles Caldera could air on the local Public Broadcasting System as soon as January. January 1, 2013 dummy image Read our archives Contacts Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email The piece explores the potential impact of climate change and the 2011 Los Conchas fire on the sensitive ecosystem in the area. The first of three documentaries on the Valles Caldera could air on the local Public Broadcasting System (KNME) as soon as January. The piece, called Valles Caldera: The Science, explores the potential impact of

242

Technology Readiness Levels for Advanced Nuclear Fuels and Materials Development  

SciTech Connect (OSTI)

The Technology Readiness Level (TRL) process is used to quantitatively assess the maturity of a given technology. The TRL process has been developed and successfully used by the Department of Defense (DOD) for development and deployment of new technology and systems for defense applications. In addition, NASA has also successfully used the TRL process to develop and deploy new systems for space applications. Advanced nuclear fuels and materials development is a critical technology needed for closing the nuclear fuel cycle. Because the deployment of a new nuclear fuel forms requires a lengthy and expensive research, development, and demonstration program, applying the TRL concept to the advanced fuel development program is very useful as a management and tracking tool. This report provides definition of the technology readiness level assessment process as defined for use in assessing nuclear fuel technology development for the Advanced Fuel Campaign (AFC).

Jon Carmack

2014-01-01T23:59:59.000Z

243

DOE Challenge Home Consolidated Renewable Energy Ready Checklist  

Broader source: Energy.gov (indexed) [DOE]

Consolidated Consolidated Renewable Energy Ready Checklist DOE Challenge Home National Program Requirements Mandatory Requirement 7 (Renewable Ready) shall be met by any home certified under the DOE Challenge Home program, only where all three conditions of the following conditions are met: 1. Location, based on zip code has at least 5 kWh/m 2 /day average daily solar radiation based on annual solar insolation using PVWatts online tool: http://gisatnrel.nrel.gov/PVWatts_Viewer/index.html AND; 2. Location does not have significant natural shading (e.g., trees, tall buildings on the south- facing roof, AND; 3. Home as designed has adequate free roof area within +/-45° of true south as noted in the table below. Note that in some cases a house may have insufficient roof area for the Solar

244

Marine and Hydrokinetic Technology Readiness Level | Open Energy  

Open Energy Info (EERE)

Marine and Hydrokinetic Technology Readiness Level Marine and Hydrokinetic Technology Readiness Level Jump to: navigation, search << Return to the MHK database homepage This field indicates the stage of development/deployment that technologies, which are undergoing partial or full-scale device testing, are currently in. Contents 1 TRL 1-3: Discovery / Concept Definition / Early Stage Development, Design, and Engineering 2 TRL 4: Proof of Concept 3 TRL 5/6: System Integration and Technology Laboratory Demonstration 4 TRL 7/8: Open Water System Testing, Demonstration, and Operation 5 TRL 9: Commercial-Scale Production / Application TRL 1-3: Discovery / Concept Definition / Early Stage Development, Design, and Engineering The purpose of this stage is to evaluate, to the largest extent possible, the scientific or technical merit and feasibility of ideas that appear to

245

Corn Stover Conversion to Biofuels: DOE's Preparation for Readiness in 2012 (Guest Editorial)  

SciTech Connect (OSTI)

Today, the United States Energy Independence and Security Act (EISA) of 2007 focuses on biofuels support research and development (R and D) needed to enable achieving respective volumetric and cost targets. Indeed, the worldwide objective is to bring us closer to independence from transportation fuels derived from fossil resources. This Special Issue highlights key areas of science and technology that impact the rollout of viable corn stover biofuels processes by 2012.

Himmel, M. E.

2009-01-01T23:59:59.000Z

246

Educators: Are You Ready to Teach Energy Literacy? Join our August 5 Webinar to Prepare.  

Broader source: Energy.gov [DOE]

Educators, join this virtual town hall to hear about national, new media and localized efforts using e-books, experiential curriculum and best practices in energy education and learn about resources including the Women @ Energy series (www.energy.gov/womeninstem) to use in your classroom.

247

Verification of Readiness to Start Up or Restart Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes requirements for verifying readiness for startup of new Hazard Category 1, 2, and 3 nuclear facilities, activities, and operations, and for restart of existing Hazard Category 1, 2, and 3 nuclear facilities, activities, and operations that have been shut down. Cancels DOE O 425.1C. Adm Chg 1, dated 4-2-13, cancels DOE O 425.1D.

2010-04-16T23:59:59.000Z

248

Proposed Transmission Towers Proposed New Substation Sites Proposed...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6-1E: Recreation Inset Maps for Map 6-1C and Map 6-1D Proposed Transmission Towers Proposed New Substation Sites Proposed Route Segments (not drawn to scale) New Access Roads...

249

Preparing Your  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Preparing Your Applications for Future NERSC Machines Jack Deslippe NERSC User Services 1082013 What HPC Will Look Like at NERSC in 2017 The Future Will Have Many-Cores...

250

California Energy Commission PROPOSED AMENDED STANDARDS  

E-Print Network [OSTI]

California Energy Commission PROPOSED AMENDED STANDARDS NONRESIDENTIAL ACCEPTANCE TESTING ENERGY COMMISSION Martha Brook Project Manager & Principal Author Eurlyne Geiszler Staff members of the California Energy Commission prepared this report. As such, it does not necessarily

251

Mexico-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Mexico-The World Bank Partnership for Market Readiness (PMR) Mexico-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Mexico-The World Bank Partnership for Market Readiness (PMR) Name Mexico-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

252

Colombia-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

Colombia-The World Bank Partnership for Market Readiness (PMR) Colombia-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Colombia-The World Bank Partnership for Market Readiness (PMR) Name Colombia-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

253

Brazil-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Brazil-The World Bank Partnership for Market Readiness (PMR) Brazil-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Brazil-The World Bank Partnership for Market Readiness (PMR) Name Brazil-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

254

Thailand-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

Thailand-The World Bank Partnership for Market Readiness (PMR) Thailand-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Thailand-The World Bank Partnership for Market Readiness (PMR) Name Thailand-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

255

China-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

China-The World Bank Partnership for Market Readiness (PMR) China-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: China-The World Bank Partnership for Market Readiness (PMR) Name China-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

256

India-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

India-The World Bank Partnership for Market Readiness (PMR) India-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: India-The World Bank Partnership for Market Readiness (PMR) Name India-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

257

Ukraine-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Ukraine-The World Bank Partnership for Market Readiness (PMR) Ukraine-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Ukraine-The World Bank Partnership for Market Readiness (PMR) Name Ukraine-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

258

Chile-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Chile-The World Bank Partnership for Market Readiness (PMR) Chile-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Chile-The World Bank Partnership for Market Readiness (PMR) Name Chile-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

259

Vietnam-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Vietnam-The World Bank Partnership for Market Readiness (PMR) Vietnam-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Vietnam-The World Bank Partnership for Market Readiness (PMR) Name Vietnam-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

260

Morocco-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Morocco-The World Bank Partnership for Market Readiness (PMR) Morocco-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Morocco-The World Bank Partnership for Market Readiness (PMR) Name Morocco-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

DOE Zero Energy Ready Home: Better Business for Builders Webinar Transcript  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, DOE Zero Energy Ready Home: Better Business for Builders, presented in August 2014.

262

Marketing and Sales Solutions for Zero Energy Ready Homes Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, Marketing and Sales Solutions for Zero Energy Ready Homes, presented in June 2014.

263

DOE Zero Energy Ready Home Low Load High Efficiency HVAC Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the DOE Zero Energy Ready Home webinar, Low Load High Efficiency HVAC, presented in May 2014.

264

DOE Zero Energy Ready Home Case Study, Ferguson Design and Constructio...  

Energy Savers [EERE]

Home Case Study, Ferguson Design and Construction, Inc., Sagaponak, NY, Custom Home DOE Zero Energy Ready Home Case Study, Ferguson Design and Construction, Inc., Sagaponak, NY,...

265

Sales and Value Recognition for Zero Energy Ready Home Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, Sales and Value Recognition for Zero Energy Ready Home, presented in December 2014.

266

DOE Zero Energy Ready Home Case Study: Habitat for Humanity South...  

Energy Savers [EERE]

Home Case Study, Manatee County Habitat for Humanity, Ellenton, FL, Affordable DOE Zero Energy Ready Home Case Study: Southeast Volusia Habitat for Humanity, Edgewater, FL...

267

Energy-- and Water-- Efficiency in the DOE Zero Energy Ready Home Program Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, Energy -- and Water -- Efficiency in the DOE Zero Energy Ready Home Program, presented in October 2014.

268

Jordan-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Jordan-The World Bank Partnership for Market Readiness (PMR) Jordan-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Jordan-The World Bank Partnership for Market Readiness (PMR) Name Jordan-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

269

Indonesia-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

Indonesia-The World Bank Partnership for Market Readiness (PMR) Indonesia-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Indonesia-The World Bank Partnership for Market Readiness (PMR) Name Indonesia-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

270

Turkey-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Turkey-The World Bank Partnership for Market Readiness (PMR) Turkey-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Turkey-The World Bank Partnership for Market Readiness (PMR) Name Turkey-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

271

DOE Zero Energy Ready Home High-Performance Home Sales Training Part 1 Webinar-- Text Version  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar DOE Zero Energy Ready Home High-Performance Home Sales Training Part 1, presented in February 2015.

272

NCTCOG Solar Ready II Project: Clean Air Through Energy Efficiency  

E-Print Network [OSTI]

Clean Air Through Energy Efficiency November 20, 2014 NCTCOG Solar Ready II Project Lori Clark Principal Air Quality Planner ESL-KT-14-11-12 CATEE 2014: Clean Air Through Efficiency Conference, Dallas, Texas Nov. 18-20 U.S. Department of Energy Sun...Shot Initiative Rooftop Solar Challenge 2 ESL-KT-14-11-12 CATEE 2014: Clean Air Through Efficiency Conference, Dallas, Texas Nov. 18-20 U.S. Department of Energy (DOE) SunShot Initiative The U.S. Department of Energy SunShot Initiative is a collaborative national...

Clark,L.

2014-01-01T23:59:59.000Z

273

A Qualitative Readiness-Requirements Assessment Model for Enterprise Big-Data Infrastructure Investment  

SciTech Connect (OSTI)

In the last three decades, there has been an exponential growth in the area of information technology providing the information processing needs of data-driven businesses in government, science, and private industry in the form of capturing, staging, integrating, conveying, analyzing, and transferring data that will help knowledge workers and decision makers make sound business decisions. Data integration across enterprise warehouses is one of the most challenging steps in the big data analytics strategy. Several levels of data integration have been identified across enterprise warehouses: data accessibility, common data platform, and consolidated data model. Each level of integration has its own set of complexities that requires a certain amount of time, budget, and resources to implement. Such levels of integration are designed to address the technical challenges inherent in consolidating the disparate data sources. In this paper, we present a methodology based on industry best practices to measure the readiness of an organization and its data sets against the different levels of data integration. We introduce a new Integration Level Model (ILM) tool, which is used for quantifying an organization and data system s readiness to share data at a certain level of data integration. It is based largely on the established and accepted framework provided in the Data Management Association (DAMA-DMBOK). It comprises several key data management functions and supporting activities, together with several environmental elements that describe and apply to each function. The proposed model scores the maturity of a system s data governance processes and provides a pragmatic methodology for evaluating integration risks. The higher the computed scores, the better managed the source data system and the greater the likelihood that the data system can be brought in at a higher level of integration.

Olama, Mohammed M [ORNL] [ORNL; McNair, Wade [ORNL] [ORNL; Sukumar, Sreenivas R [ORNL] [ORNL; Nutaro, James J [ORNL] [ORNL

2014-01-01T23:59:59.000Z

274

Abstracting Preparation  

E-Print Network [OSTI]

Guidelines & Review Manuscript Preparation Submit Your Manuscript Book Reviews Movies & Videos Contact of Biological and Chemical Sciences. Queen Mary, University of London, Mile End Road, London, UK. Abstract Two motive force for energy conversion, providing for metabolism, for active transport, and for synthesis

Allen, John F.

275

Final Report on HOLODEC 2 Technology Readiness Level  

SciTech Connect (OSTI)

During the period of this project, the Holographic Detector for Clouds 2 (HOLODEC 2) instrument has advanced from a laboratory-proven instrument with some initial field testing to a fully flight-tested instrument capable of providing useful cloud microphysics measurements. This can be summarized as 'Technology Readiness Level 8: Technology is proven to work - Actual technology completed and qualified through test and demonstration.' As part of this project, improvements and upgrades have been made to the optical system, the instrument power control system, the data acquisition computer, the instrument control software, the data reconstruction and analysis software, and some of the basic algorithms for estimating basic microphysical variables like droplet diameter. Near the end of the project, the instrument flew on several research flights as part of the IDEAS 2011 project, and a small sample of data from the project is included as an example. There is one caveat in the technology readiness level stated above: the upgrades to the instrument power system were made after the flight testing, so they are not fully field proven. We anticipate that there will be an opportunity to fly the instrument as part of the IDEAS project in fall 2012.

Shaw, RA; Spuler, SM; Beals, M; Black, N; Fugal, JP; Lu, L

2012-06-18T23:59:59.000Z

276

Prepared Remarks  

Broader source: Energy.gov (indexed) [DOE]

Prepared Prepared Remarks of Brian Forshaw Connecticut Municipal Electric Energy Cooperative At U.S. DOE Workshop on Transmission Congestion Hartford, Connecticut July 9,2008 The Connecticut Municipal Electric Energy Cooperative was created by the publicly-owned electric systems in the State of Connecticut to enable the municipal systems to provide electric service to their customers at the lowest reasonable cost. Currently, CMEEC provides full requirements wholesale electric service to the State's eight public power systems as well as the Mohegan Tribal Utility Authority. As Director of Energy Markets, I am responsible for strategic planning activities and analysis of the impacts that wholesale markets will have on the municipal electric utilities. My responsibilities also include representing CMEEC in the ISO-NE stakeholder process, including the ISO-NE technical committees.

277

LANSCE | User Resources | Proposals  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lujan Neutron Scattering Center: First Call for Proposals is now Closed. Thank you for your Submission. Proposal Submission The Lujan Center call for proposals opens May 6, 2014....

278

LANSCE | User Resources | Proposals  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proposals LANSCE accepts proposals for the Lujan Neutron Scattering Center, Proton Radiography (pRad) and the Weapons Neutron Research Facility (WNR). Calls for proposals are...

279

Memo of Readiness to Proceed with Phase 1 Privatization for the Tank Farm Contractor  

SciTech Connect (OSTI)

This Readiness to Proceed Memorandum provides the CH2M HILL Hanford Group, Inc. formal certification of readiness to proceed with provision of the waste feed and infrastructure to handle the products from the privatization contractor's waste processing plant. Summary information is included from the integrated scope-cost-schedule baseline, the analyses of the baseline, management systems, and systems reviews.

HONEYMAN, J.O.

2000-04-24T23:59:59.000Z

280

Evaluation of Organizational E-Government Readiness in the Public Sector  

Science Journals Connector (OSTI)

The purpose of this paper is to provide an integrated framework to evaluate organizational e-government readiness for government organizations. This framework is necessary as current ones ignore challenges that arise due to organizational transformation ... Keywords: E-Government, E-Readiness, Information and Communication Technologies ICTs, Organizational Adoption, Organizational Strategy

Ibrahim A. Alghamdi; Robert Goodwin; Giselle Rampersad

2013-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

The Effects of Structured Work Experience on the Work-Readiness Skills of Students with Disabilities  

E-Print Network [OSTI]

. The problem is the lack of intervention research demonstrating ways of implementing programs that are associated with acquisition of work-readiness skills. The purpose of this study was to investigate the effects of structured work experience on the work-readiness...

Pacha, Jacqueline K

2013-05-03T23:59:59.000Z

282

Shadow Review of the Advanced Mixed Waste Treatment Project Transuranic Storage Area Retrieval Enclosue Restrieval Restart DOE Readiness Assessment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ID-2011-09-22 ID-2011-09-22 Site: Idaho Site - Idaho Cleanup Project Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Shadow Review of the Advanced Mixed Waste Treatment Project (AMWTP) Transuranic Storage Area-Retrieval Enclosure (TSA-RE) Retrieval Restart Department of Energy Readiness Assessment Dates of Activity : 09/20/2011 - 09/22/2011 Report Preparer: Aleem Boatright Activity Description/Purpose: A review of nuclear safety implementation verification review (IVR) procedures and processes was conducted at the Idaho Site from September 12-22, 2011. The scope originally included shadowing of the Department of Energy (DOE) Idaho Operations Office (DOE-ID) Idaho Cleanup Project IVR for the Sodium Bearing Waste Treatment Project (SBWTP).

283

Shadow Review of the Advanced Mixed Waste Treatment Project Transuranic Storage Area Retrieval Enclosue Restrieval Restart DOE Readiness Assessment  

Broader source: Energy.gov (indexed) [DOE]

ID-2011-09-22 ID-2011-09-22 Site: Idaho Site - Idaho Cleanup Project Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Shadow Review of the Advanced Mixed Waste Treatment Project (AMWTP) Transuranic Storage Area-Retrieval Enclosure (TSA-RE) Retrieval Restart Department of Energy Readiness Assessment Dates of Activity : 09/20/2011 - 09/22/2011 Report Preparer: Aleem Boatright Activity Description/Purpose: A review of nuclear safety implementation verification review (IVR) procedures and processes was conducted at the Idaho Site from September 12-22, 2011. The scope originally included shadowing of the Department of Energy (DOE) Idaho Operations Office (DOE-ID) Idaho Cleanup Project IVR for the Sodium Bearing Waste Treatment Project (SBWTP).

284

Welcome to the Operation READY 2002 collection Flexible formats: print, CD-ROM, DVD video and Web  

E-Print Network [OSTI]

1 Welcome to the Operation READY 2002 collection Flexible formats: print, CD-ROM, DVD video and Web Op READY 2002 documents in PDF and Word Customize to meet local needs Versatile training tools CD-ROM

285

Mobile RNA is Poised and Ready | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Glass Does a Double-Take Glass Does a Double-Take Welcoming a New Family of Superconductors A Lensless X-ray Camera for Nanoscale Materials and Biological Specimens The Collagen Protein Viewed at Unprecedented Detail Assembling Nanoparticles the Easy DNA-Way Science Highlights Archives: 2013 | 2012 | 2011 | 2010 2009 | 2008 | 2007 | 2006 2005 | 2004 | 2003 | 2002 2001 | 2000 | 1998 | Subscribe to APS Science Highlights rss feed Mobile RNA is Poised and Ready APRIL 10, 2008 Bookmark and Share Ribbon representation of the group II splicing intron. To see a 360° rotation of the recently solved O. iheyensis IIC intron crystal structure, click here (credit: Kevin Keating). A new picture of a genetic parasite isolated from a deep-sea bacterium is helping researchers see how certain specialized segments of RNA escape from

286

El Salvador-Climate Finance Readiness Programme | Open Energy...  

Open Energy Info (EERE)

support from the German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU). The Programme will prepare developing countries to effectively and...

287

Colombia-Climate Finance Readiness Programme | Open Energy Information  

Open Energy Info (EERE)

support from the German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU). The Programme will prepare developing countries to effectively and...

288

Nepal-Climate Finance Readiness Programme | Open Energy Information  

Open Energy Info (EERE)

support from the German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU). The Programme will prepare developing countries to effectively and...

289

Ghana-Climate Finance Readiness Programme | Open Energy Information  

Open Energy Info (EERE)

support from the German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU). The Programme will prepare developing countries to effectively and...

290

Fiji-Climate Finance Readiness Programme | Open Energy Information  

Open Energy Info (EERE)

support from the German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU). The Programme will prepare developing countries to effectively and...

291

Benin-Climate Finance Readiness Programme | Open Energy Information  

Open Energy Info (EERE)

support from the German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU). The Programme will prepare developing countries to effectively and...

292

Energy SWAT Team Prepares for Hurricane Season | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SWAT Team Prepares for Hurricane Season SWAT Team Prepares for Hurricane Season Energy SWAT Team Prepares for Hurricane Season August 17, 2010 - 11:30am Addthis Andy Oare Andy Oare Former New Media Strategist, Office of Public Affairs What does this mean for me? First-responder training sessions at the Department help prepare employees for hurricane season and other potential energy-sector emergencies. If you live in a part of the country where hurricanes might cause damage, be sure to have a plan and a kit ready. On June 29, Hurricane Alex became the first hurricane of the 2010 season, and the first Atlantic hurricane to occur as early as June since 1995. The next day, a Department of Energy "energy response team" gathered in Washington, D.C. for the last in a series of first-responder training

293

Energy SWAT Team Prepares for Hurricane Season | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy SWAT Team Prepares for Hurricane Season Energy SWAT Team Prepares for Hurricane Season Energy SWAT Team Prepares for Hurricane Season August 17, 2010 - 11:30am Addthis Andy Oare Andy Oare Former New Media Strategist, Office of Public Affairs What does this mean for me? First-responder training sessions at the Department help prepare employees for hurricane season and other potential energy-sector emergencies. If you live in a part of the country where hurricanes might cause damage, be sure to have a plan and a kit ready. On June 29, Hurricane Alex became the first hurricane of the 2010 season, and the first Atlantic hurricane to occur as early as June since 1995. The next day, a Department of Energy "energy response team" gathered in Washington, D.C. for the last in a series of first-responder training

294

How to prepare competitive project proposals in Tempus IV  

E-Print Network [OSTI]

........................................................................................................................45 - Sustainability for the implementation of effective interventions. To facilitate this capacity building

295

Small Column Ion Exchange at Savannah River Site Technology Readiness Assessment Report  

Broader source: Energy.gov (indexed) [DOE]

Small Column Ion Exchange Technology at Small Column Ion Exchange Technology at Savannah River Site U.S. Department of Energy Office of Environmental Management Office of Technology Innovation and Development Technology Readiness Assessment Report November 2011 U.S. DOE-EM Office of Technology Innovation and Development November 11, 2011 Small Column Ion Exchange Program Technology Readiness Assessment Page 2 of 112 This page intentionally left blank November 11, 2011 U.S. DOE-EM Office of Technology Innovation and Development Small Column Ion Exchange Program Technology Readiness Assessment Page 3 of 112 APPROVALS ________________________ _ Harry D. Harmon Date

296

Operational readiness review for the Waste Experimental Reduction Facility. Final report  

SciTech Connect (OSTI)

An Operational Readiness Review (ORR) at the Idaho National Engineering Laboratory`s (INEL`s) Waste Experimental Reduction Facility (WERF) was conducted by EG&G Idaho, Inc., to verify the readiness of WERF to resume operations following a shutdown and modification period of more than two years. It is the conclusion of the ORR Team that, pending satisfactory resolution of all pre-startup findings, WERF has achieved readiness to resume unrestricted operations within the approved safety basis. ORR appraisal forms are included in this report.

Not Available

1993-11-01T23:59:59.000Z

297

General User Proposals  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proposals Print General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS or the Participating Research...

298

General User Proposals  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

General User Proposals Print General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS or the...

299

General User Proposals  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Office General User Proposals Print General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS...

300

Scientific Partner Proposals | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Partner Proposals One Scientific Partner's Experience Ron Heeren, with AMOLF in The Netherlands, collaborated with EMSL scientists through a Scientific Partner Proposal. As a...

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

RW Prepared  

Office of Legacy Management (LM)

r tz r tz s /r;1 RW Prepared by Oak Ridge Associated Un iversities Prepared for Division of Remedial Action Projects U.S. Department of Energy C O M P R E H E N S I V E R A D I O L O G I C A L S U R V E Y O F F - S I T E P R O P E R T Y B N I A G A R A F A L L S S T O R A G E S I T E L E W I S T O N , N E W Y O R K J . D . B E R G E R R a d i o l o g i c a l S i t e A s s e s s m e n t p r o g r a m Manpower Education, Research, and Training Division FINAL REPORT M a y 1 9 8 4 COMPREEENSIVE RADIOLOGICAL SURVEY OFF-SITE PROPERTY B NIAGARA FAI"LS STORAGE SITE LE"I{ISTON, NE}I YoRK u. s. F o r m e r l y U t i l i z e d P r e p a r e d f o r Department of EnergY as Dart of the S i t e s - - R e m e d i a l A c t i o n P r o g r a u J . D . B e r g e r P r o j e c t J. Burden* R . D . C o n d r a J . S . E p l e r * P . l { . F r a m e l,l . O. Eelton R . C . G o s s l e e S t a f f t { . L . S n i t h * T . J . S o w e l l ' L . B . T a u s * C. F . Weaver B . S . Z a c h a r e k R a d i o l o g i c a l Manpower Educati-on, Oak Ridge O a k R

302

Bringing Proposal Writing Training to Faculty at Minority Serving  

Broader source: Energy.gov (indexed) [DOE]

Bringing Proposal Writing Training to Faculty at Minority Serving Bringing Proposal Writing Training to Faculty at Minority Serving Institutions Bringing Proposal Writing Training to Faculty at Minority Serving Institutions June 20, 2012 - 12:20pm Addthis Bringing Proposal Writing Training to Faculty at Minority Serving Institutions Bill Valdez Bill Valdez Principal Deputy Director Money doesn't grow on trees, but it does grow from developing your school and business to the point that you're ready to compete for a Department of Energy funding opportunity. Our office's mission is to make sure that the energy programs here, including our competitive funding opportunities, are accessible to minorities and historically disadvantaged communities. That's why we're hosting technical assistance workshops at events across the country, engaging students, faculty, and staff at Minority

303

Bringing Proposal Writing Training to Faculty at Minority Serving  

Broader source: Energy.gov (indexed) [DOE]

Bringing Proposal Writing Training to Faculty at Minority Serving Bringing Proposal Writing Training to Faculty at Minority Serving Institutions Bringing Proposal Writing Training to Faculty at Minority Serving Institutions June 20, 2012 - 12:20pm Addthis Bringing Proposal Writing Training to Faculty at Minority Serving Institutions Bill Valdez Bill Valdez Principal Deputy Director Money doesn't grow on trees, but it does grow from developing your school and business to the point that you're ready to compete for a Department of Energy funding opportunity. Our office's mission is to make sure that the energy programs here, including our competitive funding opportunities, are accessible to minorities and historically disadvantaged communities. That's why we're hosting technical assistance workshops at events across the country, engaging students, faculty, and staff at Minority

304

N Springs expedited response action proposal  

SciTech Connect (OSTI)

Since signing the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in 1989, the parties to the agreement have recognized the need to modify the approach to conducting investigations, studies, and cleanup actions at Hanford. To implement this approach, the parties have jointly developed the Hanford Past-Practice Strategy. The strategy defines a non-time-critical expedited response action (ERA) as a response action ``needed to abate a threat to human health or welfare or the environment where sufficient time exists for formal planning prior to initiation of response. In accordance with the past-practice strategy, DOE proposes to conduct an ERA at the N Springs, located in the Hanford 100 N Area, to substantially reduce the strontium-90 transport into the river through the groundwater pathway. The purpose of this ERA proposal is to provide sufficient information to select a preferred alternative at N Springs. The nature of an ERA requires that alternatives developed for the ERA be field ready; therefore, all the technologies proposed for the ERA should be capable of addressing the circumstances at N Springs. A comparison of these alternatives is made based on protectiveness, cost, technical feasibility, and institutional considerations to arrive at a preferred alternative. Following the selection of an alternative, a design phase will be conducted; the design phase will include a detailed look at design parameters, performance specifications, and costs of the selected alternative. Testing will be conducted as required to generate design data.

Not Available

1994-01-01T23:59:59.000Z

305

EMSL: Proposal Extensions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proposal Summary/Extension for Fiscal Year 2014 Proposal Summary/Extension for Fiscal Year 2014 Published December 2013. Additional Information User Portal 2014 Call for Proposals 2014 Proposal Guidance 2014 Proposal Review Criteria Guidance for Letters of Intent to JGI-EMSL Collaborative Science Call Guidance for Full Proposals to JGI-EMSL Collaborative Science Call (Invited Only) 2014 Proposal Planning 2014 Proposal Summary/Extension Previous Calls External Peer Reviewers Fellowships and Awards Nufo, logo Summaries of the work performed with EMSL resources are required for all user projects (see details below) and should be submitted through the User Portal. For projects open for one year or less, these summaries are due when the proposal closes. For projects that are submitted in response to a Call for Proposals and are eligible for yearly extensions, summaries are

306

South Africa-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

South Africa-The World Bank Partnership for Market Readiness (PMR) South Africa-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: South Africa-The World Bank Partnership for Market Readiness (PMR) Name South Africa-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

307

Costa Rica-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

Costa Rica-The World Bank Partnership for Market Readiness (PMR) Costa Rica-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Costa Rica-The World Bank Partnership for Market Readiness (PMR) Name Costa Rica-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

308

Order Module--DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR  

Broader source: Energy.gov (indexed) [DOE]

DOE O 425.1D, VERIFICATION OF READINESS TO START UP DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES Order Module--DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES "The familiar level of this module is divided into three sections. In the first section we will discuss the purpose of DOE O 425.1D and the requirements for 1) determining the level of readiness review (RR), 2) determining the startup authorization authority (SAA), and 3) the startup notification report. In the second section we will discuss 1) the requirements applicable to DOE ORRs and DOE RAs, and 2) the core requirements. In the third section we will discuss the 1) requirements for DOE field element and headquarters line management oversight of the startup or restart process, 2) requirements for the records management program, and

309

Zero Energy-Ready Single-Family Homes- Building America Top Innovation  

Broader source: Energy.gov [DOE]

Many Building America teams (ARBI, BA-PIRC, BSC, CARB, IBACOS, NorthernSTAR, PHI, etc.) have worked with home builders to design and test zero-energy-ready homes.

310

Building America Top Innovations 2013 Profile Zero Energy-Ready Single-Family Homes  

Broader source: Energy.gov [DOE]

Many Building America teams (ARBI, BA-PIRC, BSC, CARB, IBACOS, NorthernSTAR, PHI, etc.) have worked with home builders to design and test zero-energy-ready homes.

311

DOE Zero Energy Ready Home Case Study: BPC Green Builders, Danbury, CT  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Danbury, CT, that scored HERS 35 without PV. This 2-story, 1,650-ft2 cabin built by a custom home builder for his own family meets Passive House...

312

DOE Zero Energy Ready Home Case Study, Clifton View Homes, Coupeville...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Study, Clifton View Homes, Coupeville, WA, Systems Home DOE Zero Energy Ready Home Case Study, Clifton View Homes, Coupeville, WA, Systems Home Case-study of a DOE Zero Energy...

313

DOE Zero Energy Ready Home Case Study: Palo Duro Homes, Albuquerque...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Study: Palo Duro Homes, Albuquerque, NM DOE Zero Energy Ready Home Case Study: Palo Duro Homes, Albuquerque, NM Case study of a New Mexico-based home builder who has built more DOE...

314

DOE Zero Energy Ready Home Case Study, Palo Duro Homes, Inc....  

Energy Savers [EERE]

Study, Palo Duro Homes, Inc., Albuquerque, NM, Production DOE Zero Energy Ready Home Case Study, Palo Duro Homes, Inc., Albuquerque, NM, Production Case study of a DOE Zero Energy...

315

DOE Zero Energy Ready Home Case Study: Palo Duro Homes, Albuquerque, NM  

Broader source: Energy.gov [DOE]

Case study of a New Mexico-based home builder who has built more DOE Zero Energy Ready certified homes than any builder in the nation. One example home achieved a HERS score of HERS 55 without PV...

316

DOE Zero Energy Ready Home Case Study: Southern Homes, Russellville, AL  

Broader source: Energy.gov [DOE]

Case study of the first manufactured home built to the DOE Zero Energy Ready Home standard. This manufactured home achieved a HERS score of 57 without PV. The home has been set up for side-by-side...

317

DOE Zero Energy Ready Home Case Study 2014: Boulder ZED Design...  

Energy Savers [EERE]

Savings: with PV -292.9 MMBtu DOE ZERO ENERGY READY HOME Boulder ZED Design Build 2 polyethylene vapor barrier, then spray foams the foundation walls with 3 inches of open-cell...

318

DOE Zero Energy Ready Home Case Study: One Sky Homes, San Jose, CA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in San Jose, CA, that achieved a HERS 69 on the California HERS score without PV, or HERS -1 with 6.4 kW of PV.

319

Building America Zero Energy Ready Home Case Study: Imery Group, Proud Green Home, Serenbe GA  

Broader source: Energy.gov [DOE]

Case study describing the first DOE-certified zero energy ready home in Georgia, featuring 2x6 advanced framed wall, spray foamed walls and attic plus rigid foam and coated OSB.

320

Focus Series: Program Finds Community Readiness Is the Key to More Retrofits  

Broader source: Energy.gov [DOE]

Focus Series: Program Finds Community Readiness Is the Key to More Retrofits, a document posted by the U.S. Department of Energys (DOES) Better Buildings Neighborhood Program.

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Predicting School Readiness for Low-Income Children With Disability Risks Identified Early.  

E-Print Network [OSTI]

This study examined school readiness at kindergarten entry for low-income children whose disability indicators were identified before age 3. Data were collected as part ofthe Early Head Start Research and Evaluation ...

Jeon, Hyun-Joo; Peterson, Carla A.; Wall, Shavaun; Carta, Judith J.; Gayle, Luze; Eshbaugh, Elaine M.; Swanson, Mark

2011-01-01T23:59:59.000Z

322

DOE Zero Energy Ready Home Case Study: TC Legend Homes, Bellingham, WA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Bellingham, WA, that achieves HERS 43 without PV or HERS 13 with 3.2 kW of PV.

323

DOE Zero Energy Ready Home Case Study: Promethean Homes, Charlottesville, VA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Charlottesville, VA, that achieves a HERS 33 without PV. The 2,572-ft2 custom home with daylight basement, has 2x6 advanced framed walls filled with R...

324

A FAST WAVELET-BASED VIDEO CODEC AND ITS APPLICATION IN AN IP VERSION 6-READY  

E-Print Network [OSTI]

,mpalkow,schmidt,mw]@fhtw-berlin.de D. MARPE Fraunhofer-Institut für Nachrichtentechnik HHI Image Processing Department Einsteinufer 37 (MCU). It is equipped with an innovative addressing system for locating mobile users and ready for next

Marpe, Detlev

325

L1:PAC.P6.04 Westinghouse Test Stand Technical Readiness Review  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PAC.P6.04 Westinghouse Test Stand Technical Readiness Review Andrew Godfrey ORNL Completed: June 25, 2013 CASL- -2013-01 -000 Consortium for Advanced Simulation of LWRs Consortium...

326

DOE Zero Energy Ready Home Case Study: Southern Energy Homes, Russellville, AL  

Broader source: Energy.gov [DOE]

Case study of the first manufactured home built to the DOE Zero Energy Ready Home standard. This manufactured home achieved a HERS score of 57 without PV. The home has been set up for side-by-side...

327

Application of the cumulative risk model in predicting school readiness in Head Start children  

E-Print Network [OSTI]

This study investigates the degree to which the cumulative risk index predicted school readiness in a Head Start population. In general, the reviewed studies indicated the cumulative risk model was efficacious in predicting adverse developmental...

Rodriguez-Escobar, Olga Lydia

2009-05-15T23:59:59.000Z

328

ZERH Webinar: Sales and Value Recognition of Zero Energy Ready Homes  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy Zero Energy Ready Home (ZERH) Program represents a whole new level of home performance, with rigorous requirements that ensure outstanding levels of energy savings,...

329

ZERH Webinar: Energy- and Water- Efficiency in the DOE Zero Energy Ready Home Program  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy Zero Energy Ready Home (ZERH) Program represents a whole new level of home performance, with rigorous requirements that ensure outstanding levels of energy savings,...

330

DOE Zero Energy Ready Home Going Green and Building Strong: Building...  

Broader source: Energy.gov (indexed) [DOE]

2 Webinar (Text Version) DOE Zero Energy Ready Home Going Green and Building Strong: Building a FORTIFIED Home -- Part 2 Webinar (Text Version) Below is the text version of the...

331

DOE Zero Energy Ready Home Case Study, BPC Green Builders, Custom...  

Broader source: Energy.gov (indexed) [DOE]

Study, BPC Green Builders, Custom Home, New Fairfield, CT DOE Zero Energy Ready Home Case Study, BPC Green Builders, Custom Home, New Fairfield, CT Case study of a DOE Zero Energy...

332

DOE Zero Energy Ready Home Going Green and Building Strong: Building...  

Broader source: Energy.gov (indexed) [DOE]

1 Webinar (Text Version) DOE Zero Energy Ready Home Going Green and Building Strong: Building a FORTIFIED Home -- Part 1 Webinar (Text Version) Below is the text version of the...

333

DOE ZERH Webinar: Technical Resources for Marketing and Selling Zero Energy Ready Homes  

Broader source: Energy.gov [DOE]

Plan review energy modeling field inspections certificationdone! Right? If only it were that simple to successfully transition to Zero Energy Ready Homes. The reality is that theres a lot...

334

The Sandia MEMS Passive Shock Sensor : FY08 testing for functionality, model validation, and technology readiness.  

SciTech Connect (OSTI)

This report summarizes the functional, model validation, and technology readiness testing of the Sandia MEMS Passive Shock Sensor in FY08. Functional testing of a large number of revision 4 parts showed robust and consistent performance. Model validation testing helped tune the models to match data well and identified several areas for future investigation related to high frequency sensitivity and thermal effects. Finally, technology readiness testing demonstrated the integrated elements of the sensor under realistic environments.

Walraven, Jeremy Allen; Blecke, Jill; Baker, Michael Sean; Clemens, Rebecca C.; Mitchell, John Anthony; Brake, Matthew Robert; Epp, David S.; Wittwer, Jonathan W.

2008-10-01T23:59:59.000Z

335

Effects of Parent Expectations and Involvement on the School Readiness of Children in Head Start  

E-Print Network [OSTI]

of children enrolled in Head Start. The study examined how these iv parent variables were related to children?s school readiness, and differences between ethnic groups, gender groups, and level of risk. The study tested a model whereby the effect... experimental measures in addition to questionnaires adapted from standardized measures to assess parent behaviors. Standardized measures were administered to children to assess school readiness. Demographic information and level of risk were gathered using...

Cook, Krystal Tisha'

2010-10-12T23:59:59.000Z

336

Greenhouse gas emission reduction anticipating CO2 capture. How ready are you?  

Science Journals Connector (OSTI)

The Dutch Ministry of Spatial Planning and the Environment (VROM) engaged Jacobs Consultancy to develop a definition and measuring tool aimed at quantifying the CO2 Capture Readiness of a combustion plant. The tool developed tests the level and completeness of pre-project execution information. The testing of pre-project information is a standard practice in the refining and petrochemical industry and Jacobs Consultancy has adapted and tailored these practices to develop the Capture Readiness tool. The tool was developed in 2008 and was pilot tested on two already permitted coal fired power plant projects in 2009. The Capture Readiness tool is similar in concept to the well known Project Definition Rating Index originally introduced by the Construction Industry Institute for Major Capital Projects. The tool quantifies the readiness of a project to accommodate future CO2 capture and parallels the phased approached to Major Capital Projects used by the Project Definition Rating Index. A short introduction to the application of the PDRI methodology to test the completeness of the project development informationoften also referred to as Front End Loading or FEL, is included in this paper to establish the parallel approach we have used in the development of the Capture Readiness tool. The Jacobs Consultancy Capture Readiness tool is then discussed in more detail.

F.P.J.M. (Bas) Kerkhof; G. van Birgelen

2011-01-01T23:59:59.000Z

337

JGI - CSP Proposal Schedule  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proposal Schedule Proposal Schedule CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | FAQ Small-scale Microbial/Metagenome Proposals - reviewed twice yearly Small-scale proposals for specific types of microbial and metagenome projects are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for submission is 60 days prior to the review date. Next review dates (submission deadline in parentheses): January 2014 (Nov 22, 2013) July 2014 (May 23, 2014) Submit small-scale microbial/metagenome proposals anytime using the Work Initiation Process (WIP) interface. Synthetic Biology proposals Synthetic biology proposals are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for

338

EMSL: Proposal Guidance:  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Guidance for Fiscal Year 2014 Guidance for Fiscal Year 2014 Published December 2013 EMSL awards the majority of resources to proposals responding to the annual calls/cycles. To expedite the decision process, please contact the appropriate Capability Lead(s) based on your resource needs before beginning a proposal. Capabilities and contact information are detailed on EMSL's capability web pages. Additional Information User Portal 2014 Call for Proposals 2014 Proposal Guidance 2014 Proposal Review Criteria Guidance for Letters of Intent to JGI-EMSL Collaborative Science Call Guidance for Full Proposals to JGI-EMSL Collaborative Science Call (Invited Only) 2014 Proposal Planning 2014 Proposal Summary/Extension Previous Calls External Peer Reviewers Fellowships and Awards Nufo, logo An EMSL user proposal requires detailed information for a thorough peer and

339

Riverland expedited response action proposal  

SciTech Connect (OSTI)

The US Environmental Protection Agency (EPA) and Washington Department of Ecology (Ecology) recommended that the US Department of Energy (DOE) prepare an expedited response action (ERA) for the Riverland Railroad Car Wash Pit and the 600 Area Army Munitions Burial Site. A non-time-critical ERA proposal includes preparation of an engineering evaluation/cost analysis (EE/CA) section. The EE/CA is a rapid, focused evaluation of available technologies using specific screening factors to assess feasibility, appropriateness, and cost. The ERA proposal will undergo reviews by Westinghouse Hanford Company (WHC), DOE, EPA, Ecology, and the public. Ecology and EPA will issue an Action Agreement Memorandum after resolution of all review comments. The, memorandum will authorize remediation activities. The ERA goal is to reduce the potential for any contaminant migration to the soil column, groundwater, and Columbia River. The ERA may be the final remediation of the 100-IU-1 Operable Unit. A No Action Record of Decision may be issued after cleanup completion.

Not Available

1993-04-01T23:59:59.000Z

340

Surveillance Guides - PTS 13.2 Packaging and Preparation for Shipment  

Broader source: Energy.gov (indexed) [DOE]

PACKAGING AND PREPARATION FOR SHIPMENT PACKAGING AND PREPARATION FOR SHIPMENT 1.0 Objective The objective of this surveillance is to evaluate the effectiveness of the contractor's programs for packaging radioactive and hazardous wastes for shipment. The Facility Representative examines packages ready for shipment, observes preparation of packages, and reviews documents that establish the acceptability of packages. The Facility Representative verifies compliance with DOE requirements including requirements established by the Department of Transportation and the U.S. Nuclear Regulatory Commission. 2.0 References 2.1 DOE 5480.3, Safety Requirements for the Packaging and Transportation of Hazardous Materials, Hazardous Substances, and Hazardous Wastes

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

2014 ALCC Proposals Due  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ALCC Proposals Due February 3, 2014 2014 DOE ALCC Proposals Due February 3 December 23, 2013 by Francesca Verdier (0 Comments) DOE's 2014 call for its ASCR Leadership Computing...

342

CY15 Proposals  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

be given to JLF proposals that link to experiments, or proposed experiments, at the x-ray free electron laser facility Linear Coherent Light Source (LCLS) located at the SLAC...

343

General User Proposals  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proposals Print Tuesday, 01 June 2010 09:36 General Users are granted beam time through a peer review proposal process. They may use beamlines and endstations provided by the ALS...

344

Resubmitting a Proposal | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

be competing for more limited resources as a General proposal outside of the Call. Assess Peer Review Results Before you choose whether to revise and resubmit your proposal or...

345

The Energy Department Prepares for Tropical Storm Karen | Department of  

Broader source: Energy.gov (indexed) [DOE]

The Energy Department Prepares for Tropical Storm Karen The Energy Department Prepares for Tropical Storm Karen The Energy Department Prepares for Tropical Storm Karen October 4, 2013 - 3:00pm Addthis Marissa Newhall Marissa Newhall Managing Editor, Energy.gov What does this mean for me? Follow the latest news on Tropical Storm Karen by visiting the FEMA blog. Stay up-to-date on energy delivery impacts by reading twice-daily situation reports from the Energy Department. Visit ready.gov for more information about emergency preparedness. Editor's note: As of Monday, October 7, 2013, Energy Department reporting about Tropical Storm Karen has concluded, and no additional situation reports will be posted. The Department of Energy (DOE) is working closely with the Federal Emergency Management Agency (FEMA) and in support of state and local

346

DOE Prepares for the 2007 Hurricane Season | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Prepares for the 2007 Hurricane Season Prepares for the 2007 Hurricane Season DOE Prepares for the 2007 Hurricane Season May 30, 2007 - 1:25pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today outlined a number of steps that the Department is taking to strengthen its hurricane response system in the United States. Since Hurricanes Katrina and Rita in 2005, DOE has made operational and administrative improvements, including coordination between federal, state and local leaders, deployment of trained staff, and improvements to modeling tools. "Bringing power back online is a critical step in recovering and rebuilding from a disaster and the Department of Energy stands ready to help coordinate fuel delivery to affected areas and remove barriers in energy recovery efforts," Alex de Alvarez, DOE Deputy Director of the Office of

347

The Energy Department Prepares for Hurricane Sandy | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

The Energy Department Prepares for Hurricane Sandy The Energy Department Prepares for Hurricane Sandy The Energy Department Prepares for Hurricane Sandy October 26, 2012 - 6:15pm Addthis Amanda Scott Amanda Scott Former Managing Editor, Energy.gov What are the key facts? For more information about emergency preparedness, visit Ready.gov. For the latest news on Hurricane Sandy, visit the FEMA blog. The Department of Energy (DOE) is working closely with FEMA and, in support of state and local officials, is planning to deploy emergency response personnel in advance of Hurricane Sandy. DOE is sending personnel to the FEMA Regional Response Coordination Centers in Boston, New York and Philadelphia over the weekend as well as putting additional personnel on standby to assist. DOE is taking steps to support state and local

348

DOE Prepares for the 2007 Hurricane Season | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

DOE Prepares for the 2007 Hurricane Season DOE Prepares for the 2007 Hurricane Season DOE Prepares for the 2007 Hurricane Season May 30, 2007 - 1:25pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today outlined a number of steps that the Department is taking to strengthen its hurricane response system in the United States. Since Hurricanes Katrina and Rita in 2005, DOE has made operational and administrative improvements, including coordination between federal, state and local leaders, deployment of trained staff, and improvements to modeling tools. "Bringing power back online is a critical step in recovering and rebuilding from a disaster and the Department of Energy stands ready to help coordinate fuel delivery to affected areas and remove barriers in energy recovery efforts," Alex de Alvarez, DOE Deputy Director of the Office of

349

EIS-0418: Notice of Intent to Prepare an Environmental Impact...  

Broader source: Energy.gov (indexed) [DOE]

Dakota Notice of Intent for the Western Area Power Administration and Department of Agriculture to jointly prepare an environmental impact statement for the proposed PrairieWinds...

350

EIS-0367: Notice of Intent to Prepare an Environmental Impact...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0367: Notice of Intent to Prepare an Environmental Impact Statement Bonneville Power Administration Transmission Policy Bonneville Power Administration (BPA) proposes to...

351

EIS-0294: Notice of Intent to Prepare an Environmental Impact...  

Broader source: Energy.gov (indexed) [DOE]

of Intent to Prepare an Environmental Impact Statement Proposed Sutter Power Plant and Transmission Line Project, Calpine County, California Western Area Power Administration...

352

EIS-0474: Notice of Intent to Prepare an Environmental Impact...  

Energy Savers [EERE]

Notice of Intent to Prepare an Environmental Impact Statement Proposed Southline Transmission Line Project in New Mexico and Arizona and Possible Land Use Plan Amendments...

353

DOE Order Self Study Modules - DOE O 425.1D, Verification of Readiness to Startup or Restart Nuclear Facilities  

Broader source: Energy.gov (indexed) [DOE]

5.1D 5.1D VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES DOE O 425.1D Familiar Level June 2011 1 DOE O 425.1D VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources, you will be able to perform the following: 1. What is the purpose of DOE O 425.1D, Verification of Readiness to Startup or Restart Nuclear Facilities? 2. What are the requirements for determining the level of readiness review [operational readiness reviews (ORRs) and readiness assessments (RAs)]? 3. What are the requirements for determining the startup authorization authority? 4. What are the requirements for startup notification reports?

354

General User Proposal Scores  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

General User Proposal Scores General User Proposal Scores General User Proposal Scores Print Tuesday, 01 June 2010 10:34 Scoring Proposals are scored on a scale of 1 to 5, with 1 being the best score and 5 the worst. Reviewers are requested to use the following ranking schema: Must do High Priority Medium Priority Low priority Don't do Beam time is assigned based on each proposal's score in relation to all other proposals for a given beamline. For beamlines where beamtime requests exceed available beamtime, a cutoff score is assigned after which no beam time is allocated. proposal scores Beam Time Cutoff Scores for the Current Cycle The table below lists the percent of beam time shifts allocated/requested for each beamline, and the cutoff scores, below which no beam time was assigned.

355

Safe Frozen Turkey Preparation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

you ready for a SAFE Thanksgiving? you ready for a SAFE Thanksgiving? Thanksgiving ~ time for family, Thanksgiving this year? Test your Thanksgiving safety Safety Quiz, check out the resources and share this page with your friends and family. Most importantly, take just a little extra time to make sure your Thanksgiving holiday is safe for your loved ones. Happy Thanksgiving! 1. How should you thaw a frozen turkey? A. Set it out on the kitchen counter the night before. B. In the microwave on the "thaw" setting C. Run hot water over it in the sink. D. In the refrigerator, according to its 2. How should you store turkey leftovers? A. In the same pan you cooked it in, in the refrigerator B. Put it in gallon freezer bags and freeze C. Cut the turkey into small pieces; refrigerate stuffing and turkey separately in shallow

356

DOE Zero Energy Ready Home: Ventilation and Filtration Strategies with Indoor airPLUS Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, DOE Zero Energy Ready Home: Ventilation and Filtration Strategies with Indoor airPLUS, presented in August 2014.

357

ARM - Submitting Proposals : Guidelines  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

govField CampaignsSubmitting Proposals : Guidelines govField CampaignsSubmitting Proposals : Guidelines Schedule and Availability Preproposals now open for AMF and AAF Preproposals due 1 Feb Invited full proposals due 1 May AAF available Dec 2015 AMF1 available Apr 2016 AMF2 available early 2017 AMF3 available for guest instrumentation or intensive operational periods Forms Propose a Campaign Form Instrument Support Request (ISR) Form (Word, 89KB) Documentation Steps to Send Campaign Data to ARM Data Archive Field Campaign Guidelines (PDF, 1.1MB) Submitting Proposals : Guidelines Proposals are welcome from all members of the scientific community for conducting field campaigns and scientific research using the ARM Climate Research Facility sites at the Southern Great Plains (SGP), North Slope of Alaska (NSA), Tropical Western Pacific (TWP), one of the ARM Mobile

358

Economic analysis under uncertainty of coal fired capture-ready power plants  

Science Journals Connector (OSTI)

This study assesses the feasibility of investing in capture ready (CR) coal-based power plants under uncertainty. It defines eighteen cases according to three routes for carbon capture (post, pre and oxy-combustion) and different levels of readiness. Due to the uncertain nature of the development of capture plants, this study applies a probabilistic analysis. Findings for the more likely scenario (median value) indicated that severe pre-investments in CR plants are the best choice only when the implementation of the capture occurs in the short term. In the long term, the investment decision favored the power plants not fully ready. Interestingly, under a less likely but possible scenario (the inferior limit of the probabilistic analysis) IGCC-Ready plants become the best option in the short term, and then oxy-combustion ready plants stand out. Hence, some policies such as those based on financing lowering the discount rate perceived by investors, and those based on fund to research and development, might create an investment environment favorable to CR plants.

Pedro R.R. Rochedo; Alexandre Szklo

2013-01-01T23:59:59.000Z

359

NETL: Unsolicited Proposals  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory (NETL) as outlined in the link below which includes all DOE Program Research Areas. The...

360

Proposal Opportunities | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Collaborative Science Initiative). Proposals are encouraged that couple experiments with theory, modeling or simulation, and access is granted beginning October 1 following award...

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

2015 Electricity Form Proposals  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

include Congress, other government agencies, state governments, business and industry, private analysts and forecasters, and the general public. The proposed form was announced to...

362

SPPR Group Proposal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proposal Proposal June 23, 2010 Agenda Purpose of Meeting Presenters Background Information  Three Terminal Plan & Market Access  Business Case  Transmission Infrastructure Program ED5-Palo Verde Project Potential Rate Impacts Discussion / Comments 2 Purpose of Meeting Provide background information Share the SPPR Group's current proposal and how it might affect Parker-Davis Project (P-DP) customers Obtain your feedback on the proposal 3 Presenters Background Information - Todd Rhoades ED5-PV Project Description - Todd Rhoades Project Marketability - John Steward Project Cost & Financing - Jack Murray Potential Rate Impacts - Jack Murray Next Steps - Todd Rhoades 4 Three Terminal Plan November 2009 5 Business Case

363

Doctoral school COURSE PROPOSAL  

E-Print Network [OSTI]

Doctoral school COURSE PROPOSAL ED SPIM / Course proposal Page 1/2 2013 Title: The Web of data This course will give an overview of the principles of Linked Data along with the Web of Data, as it emerged architectures. This course also presents the concepts and definitions related to the Semantic Web (or Web

Jeanjean, Louis

364

Callfor2011 Grant Proposals  

E-Print Network [OSTI]

Callfor2011 Internship Grant Proposals Internship Grant Proposals are due on Monday, February 7, 2011 Communications Communications received an internship grant to estab- lish an internship program in the area. School of Family Life Anthropology Health Sciences Past Internship Grant Spotlights The School

Martinez, Tony R.

365

DOE-STD-3006-95; DOE Standard Planning and Conduct of Operational Readiness Reviews (ORR)  

Broader source: Energy.gov (indexed) [DOE]

3006-95 3006-95 November 1995 SUPERSEDING DOE-STD-3006-93 November 1993 DOE STANDARD PLANNING AND CONDUCT OF OPERATIONAL READINESS REVIEWS (ORR) U.S. Department of Energy AREA MISC Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (615) 576-8401. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 487-4650. DOE-STD-3006-95 i PLANNING AND CONDUCT OF OPERATIONAL READINESS REVIEWS (ORR) FOREWORD 1. DOE 0 425.1 establishes the requirement to conduct Operational Readiness Reviews

366

Ready, Set . . . Get Prepped for Monday's Launch of the 'America's Next  

Broader source: Energy.gov (indexed) [DOE]

Ready, Set . . . Get Prepped for Monday's Launch of the Ready, Set . . . Get Prepped for Monday's Launch of the 'America's Next Top Energy Innovator' Challenge Ready, Set . . . Get Prepped for Monday's Launch of the 'America's Next Top Energy Innovator' Challenge April 29, 2011 - 10:35am Addthis Ginny Simmons Ginny Simmons Former Managing Editor for Energy.gov, Office of Public Affairs The 'America's Next Top Energy Innovator' Challenge will begin on May 2. That means that starting on Monday, and continuing through December 15, entrepreneurs and start-up companies will be able to apply for any of the Department of Energy's 15,000 unlicensed patents at a greatly reduced cost and with much less paperwork. Since Secretary Chu announced the challenge at the end of March our phones have been ringing and our email inboxes have been piling up with questions

367

Get Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money |  

Broader source: Energy.gov (indexed) [DOE]

Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money Get Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money September 21, 2009 - 3:04pm Addthis Allison Casey Senior Communicator, NREL Tomorrow is the official first day of fall, and while I always mourn the end of summer, one of the best things about fall is leaf peeping! Last year, we took my father-in-law's red '57 T-bird convertible on a lovely drive through the mountains to see the bright yellow aspens. Something about a car like that draws lots of attention-honks, waves, questions. We basically made friends everywhere we went. As much fun as that was, it wasn't exactly the most fuel-efficient or environmentally friendly excursion. I know we can do better this year; beautiful leaves are less than an hour's

368

Houston Smart Grid System Almost Ready for Launch | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Smart Grid System Almost Ready for Launch Smart Grid System Almost Ready for Launch Houston Smart Grid System Almost Ready for Launch October 8, 2010 - 11:29am Addthis CenterPoint Energy employees are installing smart meters and automated distribution equipment in the company’s electric grid in Houston, Texas. | Photo courtesy of CenterPoint Energy CenterPoint Energy employees are installing smart meters and automated distribution equipment in the company's electric grid in Houston, Texas. | Photo courtesy of CenterPoint Energy Kevin Craft What does this mean for me? The AMS/IG initiative supports 588 jobs, half of which would not have existed had the company not received money from the Recovery Act. Once their smart meter is installed, consumers are able to access the Smart Meter Texas Portal online to obtain updates on their daily energy

369

Nek5000 Ready to Use after Simulations of Important Pipe Flow Benchmark |  

Broader source: Energy.gov (indexed) [DOE]

Nek5000 Ready to Use after Simulations of Important Pipe Flow Nek5000 Ready to Use after Simulations of Important Pipe Flow Benchmark Nek5000 Ready to Use after Simulations of Important Pipe Flow Benchmark January 29, 2013 - 1:42pm Addthis Velocity magnitude in MATiS-H spacer grid with swirl-type vanes. Velocity magnitude in MATiS-H spacer grid with swirl-type vanes. As part of the on-going Nek5000 validation efforts, a series of large eddy simulations (LES) have been performed for thermal stratification in a pipe. Results were in good agreement with the experiment and the simulation data has provided insight into the physics of the flow. An additional series of simulations of the OECD-NEA MATiS-H benchmark has also been completed using intermediate- fidelity modeling approaches, such as k-epsilon, k-omega shear stress transport, and ID detached eddy simulation, as well as one

370

The Ohio State University Readies for its Encore at the Solar Decathlon |  

Broader source: Energy.gov (indexed) [DOE]

The Ohio State University Readies for its Encore at the Solar The Ohio State University Readies for its Encore at the Solar Decathlon The Ohio State University Readies for its Encore at the Solar Decathlon April 15, 2011 - 5:03pm Addthis The Ohio State University displayed their design model at the International Builders' Show in Orlando, Florida from January 12-15, 2011. | Credit: All Commercial Photography/U.S. Department of Energy Solar Decathlon The Ohio State University displayed their design model at the International Builders' Show in Orlando, Florida from January 12-15, 2011. | Credit: All Commercial Photography/U.S. Department of Energy Solar Decathlon Erik Hyrkas Erik Hyrkas Media Relations Specialist, Office of Energy Efficiency & Renewable Energy How can I participate? The next Solar Decathlon will be held Sept. 23-Oct. 2, 2011, at

371

Proposal Review Panel Descriptions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proposal Review Panel Descriptions Proposal Review Panel Descriptions To ensure competent scientific review, a proposal may be assigned to a different panel (at the discretion of the Review Panel Chair), or the panel may seek additional ad hoc reviews from other experts. High-Pressure This panel reviews scattering and diffraction proposals that focus on materials at high pressure. Techniques such as (but not limited to) diffraction, nuclear resonant scattering, and inelastic x-ray scattering for materials at high pressure are appropriate for this panel to consider. Instrumentation This panel reviews proposals related to the development of beamline instrumentation, sample environments, x-ray optical components, and/or detectors that are relevant to synchrotron radiation research. This panel

372

2013 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Electricity Survey Form Changes in 2013 The U.S. Energy Information Administration (EIA) proposed changes to its electricity data collection in 2013. These changes involve three forms: Form EIA-861, "Annual Electric Power Industry Report" The addition of a new form, the Form EIA-861S, "Annual Electric Power Industry Report (Short Form)" Form EIA-923, "Power Plant Operations Report." The proposals were initially announced to the public via a Federal Register Notice published March 15, 2012. Comments regarding this proposed information collection were due by May 14, 2012. EIA reviewed all comments and made several revisions to the proposals as a result. A second Federal Register Notice was published on August 30, 2012. It outlined the proposals

373

ENERGY STAR Focus on Energy Efficiency in Ready Mix Concrete Manufacturing  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ready Mix Concrete Ready Mix Concrete Manufacturing Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In this section Get started with ENERGY STAR Make the business case Build an energy management program Measure, track, and benchmark Tools for benchmarking energy management practices Tools for tracking and benchmarking facility energy performance ENERGY STAR Energy Performance Indicators for plants

374

Analyses of Value-added for Case-ready Beef, with Special Emphasis on Texas.  

E-Print Network [OSTI]

beef at retail and increasing the value-added from beef at the packer /processor level. Adoption of case-ready packaging technology by the beef industry trans fers the function of retail cutting and packaging of fresh beef from the retail store... beef at retail and increasing the value-added from beef at the packer /processor level. Adoption of case-ready packaging technology by the beef industry trans fers the function of retail cutting and packaging of fresh beef from the retail store...

Dietrich, R.A.; Farris, D.E.; Ward, J.B

1992-01-01T23:59:59.000Z

375

How Are You Preparing to Save Energy this Fall and Winter? | Department of  

Broader source: Energy.gov (indexed) [DOE]

Preparing to Save Energy this Fall and Winter? Preparing to Save Energy this Fall and Winter? How Are You Preparing to Save Energy this Fall and Winter? September 9, 2010 - 7:30am Addthis Hard to believe, but summer is almost officially over! Cooler weather is just around the corner, and it's always best to be prepared. As Andrea mentioned on Tuesday, one of the best things you can do to get ready for cool weather is have a home energy assessment to find out where you are losing energy and how to make your home more efficient. The steps you take after a home energy assessment will help ensure that you are comfortable and efficient when the cold weather finally hits. How are you preparing to save energy this fall and winter? Each Thursday, you have the chance to share your thoughts on a question about energy efficiency or renewable energy for consumers. Please comment

376

Organizational readiness and the adoption of electronic business: the moderating role of national culture in 29 european countries  

Science Journals Connector (OSTI)

In this paper we explore the relationship between average organizational readiness and actual electronic business (e-business) adoption at a national level. Several researchers have provided empirical evidence suggesting that an organization's readiness ... Keywords: adoption, electronic business, europe, individualism, masculinity, national cultural effects, power distance, uncertainty avoidance

Tobias Kollmann*; Andreas Kuckertz; Nicola Breugst

2009-10-01T23:59:59.000Z

377

DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed...  

Broader source: Energy.gov (indexed) [DOE]

DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes DOE Withdraws Proposed Rulemaking (Test...

378

Readiness of the ATLAS Liquid Argon Calorimeter for LHC Collisions  

E-Print Network [OSTI]

The ATLAS liquid argon calorimeter has been operating continuously since August 2006. At this time, only part of the calorimeter was readout, but since the beginning of 2008, all calorimeter cells have been connected to the ATLAS readout system in preparation for LHC collisions. This paper gives an overview of the liquid argon calorimeter performance measured in situ with random triggers, calibration data, cosmic muons, and LHC beam splash events. Results on the detector operation, timing performance, electronics noise, and gain stability are presented. High energy deposits from radiative cosmic muons and beam splash events allow to check the intrinsic constant term of the energy resolution. The uniformity of the electromagnetic barrel calorimeter response along eta (averaged over phi) is measured at the percent level using minimum ionizing cosmic muons. Finally, studies of electromagnetic showers from radiative muons have been used to cross-check the Monte Carlo simulation. The performance results obtained u...

Aad, G; Abdallah, J; Abdelalim, A A; Abdesselam, A; Abdinov, O; Abi, B; Abolins, M; Abramowicz, H; Abreu, H; Acharya, B S; Adams, D L; Addy, T N; Adelman, J; Adorisio, C; Adragna, P; Adye, T; Aefsky, S; Aguilar-Saavedra, J A; Aharrouche, M; Ahlen, S P; Ahles, F; Ahmad, A; Ahmed, H; Ahsan, M; Aielli, G; Akdogan, T; kesson, T P A; Akimoto, G; Akimov, A V; Aktas, A; Alam, M S; Alam, M A; Albert, J; Albrand, S; Aleksa, M; Aleksandrov, I N; Alessandria, F; Alexa, C; Alexander, G; Alexandre, G; Alexopoulos, T; Alhroob, M; Aliev, M; Alimonti, G; Alison, J; Aliyev, M; Allport, P P; Allwood-Spiers, S E; Almond, J; Aloisio, A; Alon, R; Alonso, A; Alviggi, M G; Amako, K; Amelung, C; Ammosov, V V; Amorim, A; Amors, G; Amram, N; Anastopoulos, C; Andeen, T; Anders, C F; Anderson, K J; Andreazza, A; Andrei, V; Anduaga, X S; Angerami, A; Anghinolfi, F; Anjos, N; Antonaki, A; Antonelli, M; Antonelli, S; Antunovic, B; Anulli, F; Aoun, S; Arabidze, G; Aracena, I; Arai, Y; Arce, A T H; Archambault, J P; Arfaoui, S; Arguin, J-F; Argyropoulos, T; Arik, E; Arik, M; Armbruster, A J; Arnaez, O; Arnault, C; Artamonov, A; Arutinov, D; Asai, M; Asai, S; Asfandiyarov, R; Ask, S; sman, B; Asner, D; Asquith, L; Assamagan, K; Astbury, A; Astvatsatourov, A; Atoian, G; Auerbach, B; Auge, E; Augsten, K; Aurousseau, M; Austin, N; Avolio, G; Avramidou, R; Axen, D; Ay, C; Azuelos, G; Azuma, Y; Baak, M A; Baccaglioni, G; Bacci, C; Bach, A; Bachacou, H; Bachas, K; Backes, M; Badescu, E; Bagnaia, P; Bai, Y; Bailey, D C; Bain, T; Baines, J T; Baker, O K; Baker, M D; Baltasar Dos Santos Pedrosa, F; Banas, E; Banerjee, P; Banerjee, S; Banfi, D; Bangert, A; Bansal, V; Baranov, S P; Baranov, S; Barashkou, A; Barber, T; Barberio, E L; Barberis, D; Barbero, M; Bardin, D Y; Barillari, T; Barisonzi, M; Barklow, T; Barlow, N; Barnett, B M; Barnett, R M; Baron, S; Baroncelli, A; Barr, A J; Barreiro, F; BarreiroGuimarães da Costa, J; Barrillon, P; Barros, N; Bartoldus, R; Bartsch, D; Bastos, J; Bates, R L; Bathe, S; Batkova, L; Batley, J R; Battaglia, A; Battistin, M; Bauer, F; Bawa, H S; Bazalova, M; Beare, B; Beau, T; Beauchemin, P H; Beccherle, R; Becerici, N; Bechtle, P; Beck, G A; Beck, H P; Beckingham, M; Becks, K H; Bedajanek, I; Beddall, A J; Beddall, A; Bednr, P; Bednyakov, V A; Bee, C; Begel, M; Behar Harpaz, S; Behera, P K; Beimforde, M; Belanger-Champagne, C; Bell, P J; Bell, W H; Bella, G; Bellagamba, L; Bellina, F; Bellomo, M; Belloni, A; Belotskiy, K; Beltramello, O; Ben Ami, S; Benary, O; Benchekroun, D; Bendel, M; Benedict, B H; Benekos, N; Benhammou, Y; Benincasa, G P; Benjamin, D P; Benoit, M; Bensinger, J R; Benslama, K; Bentvelsen, S; Beretta, M; Berge, D; Bergeaas Kuutmann, E; Berger, N; Berghaus, F; Berglund, E; Beringer, J; Bernardet, K; Bernat, P; Bernhard, R; Bernius, C; Berry, T; Bertin, A; Besson, N; Bethke, S; Bianchi, R M; Bianco, M; Biebel, O; Biesiada, J; Biglietti, M; Bilokon, H; Bindi, M; Binet, S; Bingul, A; Bini, C; Biscarat, C; Bitenc, U; Black, K M; Blair, R E; Blanchard, J-B; Blanchot, G; Blocker, C; Blocki, J; Blondel, A; Blum, W; Blumenschein, U; Bobbink, G J; Bocci, A; Boehler, M; Boek, J; Boelaert, N; Bser, S; Bogaerts, J A; Bogouch, A; Bohm, C; Bohm, J; Boisvert, V; Bold, T; Boldea, V; Boldyrev, A; Bondarenko, V G; Bondioli, M; Boonekamp, M; Booth, J R A; Bordoni, S; Borer, C; Borisov, A; Borissov, G; Borjanovic, I; Borroni, S; Bos, K; Boscherini, D; Bosman, M; Bosteels, M; Boterenbrood, H; Bouchami, J; Boudreau, J; Bouhova-Thacker, E V; Boulahouache, C; Bourdarios, C; Boyd, J; Boyko, I R; Bozovic-Jelisavcic, I; Bracinik, J; Braem, A; Branchini, P; Brandenburg, G W; Brandt, A; Brandt, G; Brandt, O; Bratzler, U; Brau, B; Brau, J E; Braun, H M; Brelier, B; Bremer, J; Brenner, R; Bressler, S; Breton, D; Brett, N D; Britton, D; Brochu, F M; Brock, I; Brock, R; Brodbeck, T J; Brodet, E; Broggi, F; Bromberg, C; Brooijmans, G; Brooks, W K; Brown, G; Brubaker, E; Bruckman de Renstrom, P A; Bruncko, D; Bruneliere, R; Brunet, S; Bruni, A; Bruni, G; Bruschi, M; Buanes, T; Bucci, F; Buchanan, J; Buchholz, P; Buckley, A G; Budagov, I A; Budick, B; Bscher, V; Bugge, L; Bulekov, O; Bunse, M; Buran, T; Burckhart, H; Burdin, S; Burgess, T; Burke, S; Busato, E; Bussey, P; Buszello, C P; Butin, F; Butler, B; Butler, J M; Buttar, C M; Butterworth, J M; Byatt, T; Caballero, J; Cabrera Urbn, S; Caforio, D; Cakir, O; Calafiura, P; Calderini, G; Calfayan, P; Calkins, R; Caloba, L P; Caloi, R; Calvet, D; Camarri, P; Cambiaghi, M; Cameron, D; Campabadal-Segura, F; Campana, S; Campanelli, M; Canale, V; Canelli, F; Canepa, A; Cantero, J; Capasso, L; Capeans-Garrido, M D M; Caprini, I; Caprini, M; Capua, M; Caputo, R; Caracinha, D; Caramarcu, C; Cardarelli, R; Carli, T; Carlino, G; Carminati, L; Caron, B; Caron, S; Carrillo Montoya, G D; Carron Montero, S; Carter, A A; Carter, J R

2010-01-01T23:59:59.000Z

379

Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Federal Operational Readiness Review  

Broader source: Energy.gov (indexed) [DOE]

Federal Operational Readiness Review June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2 4.0 Results ................................................................................................................................................... 2

380

Financing Capture Ready Coal-Fired Power Plants in China by Issuing Capture Options  

E-Print Network [OSTI]

more economically with carbon dioxide capture and storage (CCS) technologies, however financing. Keywords: Capture Option, Capture Ready, Carbon Capture and Storage, Climate Change, Coal-fired Electricity;List of Abbreviations CAPM (Capital Asset Pricing Model) CCS (Carbon Capture and Storage) CEC (China

Aickelin, Uwe

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

DOE Zero Energy Ready Home Case Study: Clifton View Homes, Whidbey Island, WA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home on Whidbey Island, WA, that scores HERS 37 without PV or HERS -13 with 10 kW PV, enough to power the home and an electric car. The two-story custom home...

382

DOE Zero Energy Ready Home Case Study, Weiss Building & Development, LLC., Custom Home, Downer Grove, IL  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Downers Grove, IL that scored HERS 35 without PV. This 3,600 ft2 custom home has advanced framed walls with R-23 dense-packed fiberglass plus R-13 rigid polyiso, a sealed attic with open-cell spray foam, a pier foundation, and 95% efficient gas furnace.

383

DOE Zero Energy Ready Home Case Study, Palo Duro Homes, Inc., Albuquerque, NM, Production  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Aztec, NM that scored HERS 49 without PV. This 2,064 ft2 production home has advance framed walls, a spray foamed attic, an air source heat pump, and an HRV.

384

DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland, MI  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Midland, MI, that scored HERS 49 without PV or HERS 44 with 1.4 kW of PV. The custom home served as a prototype and energy efficiency demonstration...

385

DOE Zero Energy Ready Home Case Study: KB Home, Lancaster, CA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Lancaster, CA, that achieved a HERS 43 without PV 43 or HERS 0 with 6.9-kW PV. The two-story, 2,537ft2 home serves as a model for the production...

386

DOE Zero Energy Ready Home Case Study, KB Home, San Marcos, CA, Production Home  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in San Marcos, CA that scored HERS 52 without PV, -4 with PV. This 52,778 ft2 production home has R-20 advanced framed walls with batts plus rigid foam sheathing, an air-source heat pump for central air in sealed attic, solar water heating and 100% LED lighting.

387

DOE Zero Energy Ready Home Case Study: Amerisips Homes, Charleston, SC  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home on Johns Island in Charleston, SC, that scored HERS 30 without PV, or HERS 1 with 6-kW of PV. This custom 2-story, 2,085 ft2, home is constructed of...

388

DOE Zero Energy Ready Home Case Study, Garbett Homes, Herriman, UT, Production Home  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Herriman, UT, that scored HERS 40 without PV, -1 with PV. This 4,111 ft2 production home has R-23 advanced framed walls, and a vented attic with R-60 blown fiberglass.

389

Physics and Astronomy Department San Francisco State University Physics Readiness Exam  

E-Print Network [OSTI]

Physics and Astronomy Department San Francisco State University Physics Readiness Exam Math Qualification Test for Introductory Physics ­ Physics 111 or Physics 220 In addition to meeting course prerequisites, students wishing to enroll in Physics 111 or Physics 220 must demonstrate adequate competence

Golterman, Maarten

390

Inclusive Computer Science Education Using a Ready-made Computer Game Framework  

E-Print Network [OSTI]

Inclusive Computer Science Education Using a Ready-made Computer Game Framework Joseph Distasio and Thomas P. Way Applied Computing Technology Laboratory Department of Computing Sciences Villanova the prevailing interest in computer games among college students, both for entertainment and as a possible career

Way, Thomas

391

DOE Zero Energy Ready Home Case Study: Mandalay Homes, Prescott Valley, AZ  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in northern AZ that achieved a HERS score of 48 without PV or 25 if 3.5 kW PV were added. The two-story, 2,469-ft2 production home has 2x4 walls filled...

392

DOE Zero Energy Ready Home Case Study: AquaZephyr, Ithaca, NY  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Ithaca, NY, that achieves a HERS 56 without PV or HERS 15 with 4-kW of PV. The two-story, 1,664-ft2 home is one of 17 single-family and 4 duplex homes...

393

DOE Zero Energy Ready Home Case Study: John Hubert Associates, North Cape May, NJ  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in North Cape May, NJ, that scored a HERS 46 without PV or HERS 9 with 6.5 kW of PV. The two-story, 1,871-ft2 home has advanced-framed above-grade walls...

394

DOE Zero Energy Ready Home Case Study: M Street Homes, Houston, TX  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Houston, TX, that achieves a HERS 45 without PV or HERS 32 with 1.2 kW PV. The three-story, 4,507-ft2 custom home is powered by a unique tri-generation...

395

DOE Zero Energy Ready Home Case Study: Sterling Brook Custom Homes, Double Oak, TX  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Double Oak, TX, north of Dallas, that scored a HERS 44 without PV. The 3,752-ft2 two-story home served as an energy-efficient model home for the custom...

396

DOE Zero Energy Ready Home Case Study: The Imery Group, Serenbe, GA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Serenbe, GA, that scored a HERS 40 without PV or HERS -10 with PV. The 2,811-ft2, two-story custom home has 2x6, advanced framed walls filled with R-20...

397

DOE Zero Energy Ready Home Case Study, New Town Builders, Denver, CO, Production Home  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Denver, CO that scored HERS 41 without PV, HERS 3 with PV. This 3,560 ft2 production home has R-36 double-stud walls, a vented attic with R-50 blown fiberglass, and a 97% efficient gas furnace with ducts in conditioned space.

398

Philadelphia Gas Works Looking for a challenge and ready to power up your career?  

E-Print Network [OSTI]

Philadelphia Gas Works Looking for a challenge and ready to power up your career? The Philadelphia Gas Works (PGW) is the largest municipally-owned gas utility in the nation, supplying gas service into the large, modern facility that exists today. As one of the nation's leading natural gas providers, PGW

Plotkin, Joshua B.

399

DOE Zero Energy Ready Home Case Study: Southeast Volusia Habitat for Humanity, Edgewater, FL  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready affordable home in Edgewater, FL, that achieves a HERS score of 49 without PV. The one-story, 1,250-ft2 home has 2x4 walls with fiberglass batt inside plus R-3...

400

Explicit-Ready Nonlinear Model Predictive Control for Turbocharged Spark-Ignited Engines  

E-Print Network [OSTI]

Explicit-Ready Nonlinear Model Predictive Control for Turbocharged Spark- Ignited Engines J. El with saturated actuators. In this context, the need for model-based control laws is greater than ever with saturated actuators. In this paper, we evaluate the benefits of a nonlinear model predictive control (NMPC

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

DOE Zero Energy Ready Home Case Study: Greenhill Contracting, New Paltz, NY  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in New Paltz, NY, that achieved a HERS score of 37 without PV or 7 with 7.5-kW PV. The two-story 2,288-ft2 home is one of 9 certified homes. All of the...

402

A System Architecture for Sharing De-Identified, Research-Ready Brain Scans  

E-Print Network [OSTI]

A System Architecture for Sharing De-Identified, Research-Ready Brain Scans and Health Information Department of Radiology Abstract. Progress in our understanding of brain disorders increasingly relies on the costly collection of large standardized brain magnetic resonance imaging (MRI) data sets. Moreover

Chervenak, Ann

403

DOE Zero Energy Ready Home Case Study: Brookside Development, Derby, CT  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Derby, CT, that achieves a HERS score of 45 without PV or HERS 26 with PV. The production home is one of a development of 7 two-story, 4,000+-ft2...

404

Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report  

SciTech Connect (OSTI)

This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.

Wight, R.H.

1997-05-30T23:59:59.000Z

405

DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown, RI  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready affordable home in Charlestown, RI, that achieved a HERS Index of 47 without PV. The 2,244-ft2 two-story home with basement has 2x6 walls filled with 5.5 in. ...

406

DOE Zero Energy Ready Home Case Study, Caldwell and Johnson, Exeter, RI, Custom Home  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Exeter, Rhode Island, that scored HERS 43 without PV. This 2,000 ft2 custom home has a spray- foamed attic and walls, plus rigid foam sheathing, ducted mini-split heat pumps, and an HRV.

407

Organizational readiness for innovation in health care: some lessons from the recent literature  

E-Print Network [OSTI]

- vation) is unlikely. Furthermore, innovation must compete with other goals of health-care reformPA P E R S Organizational readiness for innovation in health care: some lessons from the recent innovation in health care, as the interaction between the innovation and the context of its introduction

Birmingham, University of

408

DOE Zero Energy Ready Home Case Study, Manatee County Habitat for Humanity, Ellenton, FL, Affordable  

Broader source: Energy.gov [DOE]

Case-study of a DOE Zero Energy Ready Home in Ellenton, FL that scored HERS 53 without PV, HERS 23 with PV. This 1,143 ft2 affordable home has R-23 ICF walls, a spray-foamed sealed attic, solar hot water, and a ducted mini-split heat pump.

409

DOE Zero Energy Ready Home Case Study: New Town Builders, Denver, CO  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Denver, CO, that achieves HERS 38 without PV or HERS -3 with 8.0 kW of PV. The 2,115-ft2 two-story production home has 9.5-in.-thick double-stud walls...

410

User readiness to interact with information systems - a human activity perspective  

E-Print Network [OSTI]

This study focuses on how and why people become ready to interact with certain information systems (IS) based on their previous experiences with the same and/or similar systems. User-system interaction can be regarded as a mediated and collaborative...

Sun, Jun

2006-10-30T23:59:59.000Z

411

DOE Zero Energy Ready Home Case Study, BPC Green Builders, Custom Home, New Fairfield, CT  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in west Connecticut that scored HERS 39 without solar PV. The 3,000 ft2 two-story home has R-33 double-walls, R-72 flat roof with closed-cell foam and blown cellulose, an ERV, and LED lighting.

412

DOE Zero Energy Ready Home Case Study, e2Homes, Winterpark, FL, Custom Homes  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Winter Park, FL that scored HERS 57 without PV or HERS -7 with PV. This 4,305 ft2 custom home has autoclaved aerated concrete walls, a sealed attic with R-20 spray foam, and ductless mini-split heat pumps.

413

DOE Zero Energy Ready Home Case Study, Ithaca Neighborhood Housing Services, Ithaca, NY  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Ithaca, NY, that scored HERS 50 without PV. These 1,160 ft2 affordable town houses have R-20 advance framed walls, R-52 blown cellulose in attic, radiant heat with 92.5 AFUE boiler, and triple-pane windows.

414

Japan ready to pay 895 million dollars more to host ITER project: report  

E-Print Network [OSTI]

Japan ready to pay 895 million dollars more to host ITER project: report 26 May 2004 Japan the deadlock between Japan and the European Union over the venue of the International Thermonuclear in the 10-billion-dollar project are the European Union, Japan, China, Russia, South Korea and the United

415

FUEL-FLEXIBLE GASIFICATION-COMBUSTION TECHNOLOGY FOR PRODUCTION OF H2 AND SEQUESTRATION-READY CO2  

SciTech Connect (OSTI)

It is expected that in the 21st century the Nation will continue to rely on fossil fuels for electricity, transportation, and chemicals. It will be necessary to improve both the thermodynamic efficiency and environmental impact performance of fossil fuel utilization. General Electric Energy and Environmental Research Corporation (GE-EER) has developed an innovative fuel-flexible Advanced Gasification-Combustion (AGC) concept to produce H{sub 2} and sequestration-ready CO{sub 2} from solid fuels. The AGC module offers potential for reduced cost and increased energy efficiency relative to conventional gasification and combustion systems. GE-EER was awarded a Vision-21 program from U.S. DOE NETL to develop the AGC technology. Work on this three-year program started on October 1, 2000. The project team includes GE-EER, California Energy Commission, Southern Illinois University at Carbondale, and T. R. Miles, Technical Consultants, Inc. In the AGC technology, coal/opportunity fuels and air are simultaneously converted into separate streams of (1) pure hydrogen that can be utilized in fuel cells, (2) sequestration-ready CO{sub 2}, and (3) high temperature/pressure oxygen depleted air to produce electricity in a gas turbine. The process produces near-zero emissions and, based on preliminary modeling work in the first quarter of this program, has an estimated process efficiency of approximately 67% based on electrical and H{sub 2} energy outputs relative to the higher heating value of coal. The three-year R and D program will determine the operating conditions that maximize separation of CO{sub 2} and pollutants from the vent gas, while simultaneously maximizing coal conversion efficiency and hydrogen production. The program integrates lab-, bench- and pilot-scale studies to demonstrate the AGC concept. This is the 1st quarterly progress report for the Vision-21 AGC program supported by U.S. DOE NETL (Contract: DE-FC26-00FT40974). This report summarizes program accomplishments for the period starting October 1, 2000 and ending December 31, 2000. The report includes an introduction summarizing the AGC concept, main program tasks, objectives of this program, and provides a summary of initial program activities covering program management and preliminary progress in first year tasks including lab- and bench-scale design, facilities preparation, and process/kinetic modeling. More over, the report presents and discusses preliminary results particularly form the bench-scale design and process modeling efforts including a process flow diagram that incorporates the AGC module with other vision-21 plant components with the objective of maximizing H{sub 2} production and process efficiency.

George Rizeq; Ravi Kumar; Janice West; Vitali Lissianski; Neil Widmer; Vladimir Zamansky

2001-01-01T23:59:59.000Z

416

Proposed Rules Federal Register  

Broader source: Energy.gov (indexed) [DOE]

21813 21813 Vol. 76, No. 75 Tuesday, April 19, 2011 DEPARTMENT OF ENERGY 10 CFR Part 429 [Docket Number: EERE-2010-BT-CE-0014] RIN 1904-AC23 Energy Conservation Program: Certification, Compliance, and Enforcement for Consumer Products and Commercial and Industrial Equipment AGENCY: Office of Energy Efficiency and Renewable Energy, Department of Energy. ACTION: Proposed rule. SUMMARY: The U.S. Department of Energy (DOE or the ''Department'') proposes to amend the compliance dates for revisions to its certification, compliance, and enforcement regulations for certain commercial and industrial equipment covered under the Energy Policy and Conservation Act of 1975, as amended (EPCA or the ''Act''). Specifically, DOE is tentatively proposing an 18-month extension to the

417

A Proposed Architecture  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proposed Proposed Architecture for the NLC Diagnostic Regions Peter Tenenbaum, for the Diagnostic Region Group LCC-Note-0011 Draft 5-February-1999 1 introduction The NLC Main Linac CD-1 design contains 4 diagnostic regions (injection, extraction, and at the junctions between supersectors); the injector and beam delivery regions contain additional diagnostic regions modelled on those in the main linac, and one additional region may be added to the main linac (at the 330 GeV point, halfway through the third supersector). Each diagnostic region must support a variety of different beam measuring and manipulating tasks. In this Note we propose an overall architecture which permits all of these requirements to be met. 2 Requirements The main linac diagnostic regions must provide the following: * Beam position monitors for use by the conventional fast feedback system, and actuators (DC

418

A proposed gravitodynamic theory  

E-Print Network [OSTI]

This paper proposes a gravitodynamic theory because there are similarities between gravitational theory and electrodynamics. Based on Einstein's principle of equivalence, two coordinate conditions are proposed into the four-dimensional line element and transformations. As a consequence,the equation of motion for gravitational force or inertial force has a form similar to the equation of Lorentz force on a charge in electrodynamics. The inertial forces in auniformly rotating system are calculated, which show that the Coriolis force is produced by a magnetic-type gravitational field. We have also calculated the Sagnac effect due to the rotation. These experimental facts strongly support our proposed coordinate conditions. In addition, the gravitodynamic field equations are briefly discussed. Since only four gravitational potentials (3 + 1 split) enter the metric tensor, the gravitodynamic field equations in ``3+1 split" form would be analogous to Maxwell's equations.

T. Chang

1997-03-18T23:59:59.000Z

419

2014 Electricity Form Proposals  

U.S. Energy Information Administration (EIA) Indexed Site

Electricity and Renewable (Photovoltaic) Survey Form Changes Proposed for Electricity and Renewable (Photovoltaic) Survey Form Changes Proposed for 2014 The U.S. Energy Information Administration (EIA) is proposing changes to its electricity data collection in 2014. These changes involve the following surveys: Form EIA-63B, "Annual Photovoltaic Cell/Module Shipments Report," Form EIA-411, "Coordinated Bulk Power Supply Program Report," Form EIA-826, "Monthly Electric Utility Sales and Revenue Report with State Distributions," Form EIA-860, "Annual Electric Generator Report," Form EIA-860M, "Monthly Update to the Annual Electric Generator Report," Form EIA-861, "Annual Electric Power Industry Report," Form EIA-861S, "Annual Electric Power Industry Report (Short Form)," and

420

Unsolicited Proposals | Department of Energy  

Office of Environmental Management (EM)

Unsolicited Proposals Unsolicited Proposals The Department of Energy's (DOE's) central point of receipt for all Unsolicited Proposals is the National Energy Technology Laboratory...

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Session 2793 USING INTRANET TOOLS TO TEACH A PROJECT PROPOSAL  

E-Print Network [OSTI]

Session 2793 USING INTRANET TOOLS TO TEACH A PROJECT PROPOSAL PREPARATION COURSE IN ENGINEERING TECHNOLOGY Albert Lozano-Nieto Penn State University at Wilkes-Barre P.O. Box PSU Lehamn, PA 18627 Phone of an Intranet Tool (First ClassTM) to carry out a Projects Proposal course. Although the experiences described

Lozano-Nieto, Albert

422

Project Proposal Project Logistics  

E-Print Network [OSTI]

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

423

Proposed Drill Sites  

SciTech Connect (OSTI)

Proposed drill sites for intermediate depth temperature gradient holes and/or deep resource confirmation wells. Temperature gradient contours based on shallow TG program and faults interpreted from seismic reflection survey are shown, as are two faults interpreted by seismic contractor Optim but not by Oski Energy, LLC.

Lane, Michael

2013-06-28T23:59:59.000Z

424

Proposed Drill Sites  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Proposed drill sites for intermediate depth temperature gradient holes and/or deep resource confirmation wells. Temperature gradient contours based on shallow TG program and faults interpreted from seismic reflection survey are shown, as are two faults interpreted by seismic contractor Optim but not by Oski Energy, LLC.

Lane, Michael

425

ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THREE BUILDINGS AT THE  

Office of Legacy Management (LM)

ACTION DESCRIPTION MEMORANDUM ACTION DESCRIPTION MEMORANDUM PROPOSED DECONTAMINATION OF THREE BUILDINGS AT THE UNIVERSITY OF CHICAGO CONTAMINATED AS A RESULT OF PREVIOUS MED/AEC ACTIVITIES Prepared by Environmental Research Division Argonne National Laboratory Argonne, Illinois December 1983 Prepared for U.S. Department of Energy Oak Ridge Operations Technical Services Division Oak Ridge, Tennessee II-39 CONTENTS Page Summary of Proposed Action ....................... 1 Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. 1 Background and Need for Action ..................... 2 Proposed Remedial Action ........................ 3 Potential Issues ................... ......... 4 Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. 6 Tables. ............ .................. 7 References ................... ............ 8

426

Internal Audit Preparation Worksheet  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 Internal Audit Preparation Job Aid 11_0304 Page 1 of 5 2 Internal Audit Preparation Job Aid 11_0304 Page 1 of 5 EOTA - Business Form Document Title: Internal Audit Preparation Job Aid Document Number: F-012 Rev. 11_0304 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-007, Internal Audit Process Notify of Changes: Internal Auditors Referenced Document(s): F-011 Internal Audit Report F-012 Internal Audit Preparation Job Aid 11_0304 Page 2 of 5 Revision History: Rev. Description of Change A Initial Release 11_0304 Change title from Worksheet to Job Aid and changed revision from alpha to numeric for consistency. F-012 Internal Audit Preparation Job Aid 11_0304 Page 3 of 5 Internal Audit Preparation Worksheet F-012 Internal Audit Preparation Job Aid 11_0304 Page 4 of 5

427

UTILITY ADVANCED TURBINE SYSTEMS (ATS) TECHNOLOGY READINESS TESTING  

SciTech Connect (OSTI)

The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the U.S. Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detail design. Validation of critical components and technologies will be performed, including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer conflation testing. Processes will be developed to support the manufacture of the first system, which was to have been sited and operated in Phase 4 but will now be sited and operated commercially by GE. This change has resulted from DOE's request to GE for deletion of Phase 4 in favor of a restructured Phase 3 (as Phase 3R) to include full speed, no load (FSNL) testing of the 7H gas turbine. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. The objective of this task is to design 7H and 9H compressor rotor and stator structures with the goal of achieving high efficiency at lower cost and greater durability by applying proven GE Power Systems (GEPS) heavy-duty use design practices. The designs will be based on the GE Aircraft Engines (GEAE) CF6-80C2 compressor. Transient and steady-state thermo-mechanical stress analyses will be run to ensure compliance with GEPS life standards. Drawings will be prepared for forgings, castings, machining, and instrumentation for full speed, no load (FSNL) tests of the first unit on both 9H and 7H applications.

Unknown

1999-04-01T23:59:59.000Z

428

EIS-0438: Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, Wyoming  

Broader source: Energy.gov [DOE]

After the applicant withdrew its request to interconnect the proposed Hermosa West Wind Farm Project with Western Area Power Administrations transmission system, Western cancelled preparation of an EIS to evaluate the potential environmental impacts of the proposal.

429

PTS 13.2 Packaging and Preparation for Shipment 4/10/95 | Department of  

Broader source: Energy.gov (indexed) [DOE]

PTS 13.2 Packaging and Preparation for Shipment 4/10/95 PTS 13.2 Packaging and Preparation for Shipment 4/10/95 PTS 13.2 Packaging and Preparation for Shipment 4/10/95 The objective of this surveillance is to evaluate the effectiveness of the contractor's programs for packaging radioactive and hazardous wastes for shipment. The Facility Representative examines packages ready for shipment, observes preparation of packages, and reviews documents that establish the acceptability of packages. The Facility Representative verifies compliance with DOE requirements including requirements established by the Department of Transportation and the U.S. Nuclear Regulatory Commission. PTS13-02.doc More Documents & Publications PTS 13.1 Radioactive And Hazardous Material Transportation 4/13/00 CMS 3.4 Temporary Changes, 4/10/95

430

EIS-0288-S1: Notice of Intent to Prepare a Supplemental Environmental  

Broader source: Energy.gov (indexed) [DOE]

288-S1: Notice of Intent to Prepare a Supplemental 288-S1: Notice of Intent to Prepare a Supplemental Environmental Impact Statement EIS-0288-S1: Notice of Intent to Prepare a Supplemental Environmental Impact Statement Production of Tritium in a Commercial Light Water Reactor For more information contact: Mr. Curtis Chambellan, Document Manager U.S. Department of Energy National Nuclear Security Administration Box 5400, Albuquerque, New Mexico 87185-5400 Fax: 505-845-5754 Telephone: 505-845-5073 Electronic mail: tritium.readiness.seis@doeal.gov The public scoping meeting was held on October 20, 2011 at the Southeast Tennessee Trade and Conference Center, Athens, TN., 6:30-10:00 pm. The NNSA announces its intent to prepare a SEIS to update the environmental analyses in DOE's 1999 EIS for the Production of Tritium in a Commercial

431

EIS-0288-S1: Notice of Intent to Prepare a Supplemental Environmental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EIS-0288-S1: Notice of Intent to Prepare a Supplemental EIS-0288-S1: Notice of Intent to Prepare a Supplemental Environmental Impact Statement EIS-0288-S1: Notice of Intent to Prepare a Supplemental Environmental Impact Statement Production of Tritium in a Commercial Light Water Reactor For more information contact: Mr. Curtis Chambellan, Document Manager U.S. Department of Energy National Nuclear Security Administration Box 5400, Albuquerque, New Mexico 87185-5400 Fax: 505-845-5754 Telephone: 505-845-5073 Electronic mail: tritium.readiness.seis@doeal.gov The public scoping meeting was held on October 20, 2011 at the Southeast Tennessee Trade and Conference Center, Athens, TN., 6:30-10:00 pm. The NNSA announces its intent to prepare a SEIS to update the environmental analyses in DOE's 1999 EIS for the Production of Tritium in a Commercial

432

Environmental Assessment - Proposed Actions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

availability of Waste availability of Waste Isolation Pilot Plant (WIPP) facilities and infrastructure to scientists who wish to conduct experiments there. DOE would allow these experiments if they can be conducted without interfering with the WIPP's primary transuranic waste disposal mission and if they reflect contemporary budget priorities. This fact sheet presents questions and answers about the proposed action and its alternative. The deep geologic repository at the WIPP could provide a favorable environment for exper- iments in many scientific disciplines, including particle astrophysics, waste repository sci- ence, mining technology, low radiation dose physics, fissile materials accountability and transparency, and deep geophysics. Los Alamos National Laboratory has been conducting

433

SSRL- Proposal Review Panel  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Stanford Synchrotron Radiation Lab Stanford Synchrotron Radiation Lab search Go [an error occurred while processing this directive] Proposal Review Panel Sub Panels Structural Molecular Biology & Biophysics Materials 1: Structure, Reactivity & Self-Assembly Materials 2: Electronic Properties, Magnetic Properties & Surface Science Molecular Environmental & Interface Science Membership Torgny Gustafsson Rutgers University Dept of Physics & Astronomy 136 Frelinghuysen Rd Piscataway NJ 08854-0849 Victor Henrich Yale University Dept of Applied Physics 327 Becton Center, 15 Prospect St. New Haven CT 06511 Christopher P. Hill University of Utah Biochemistry 15 N. Medical Dr. East, Rm 4100 Salt Lake City, UT 84112-5650 Franz Himpsel University of Wisconsin Dept of Physics 1150 University Avenue

434

Technology Readiness Assessment (TRA)/Technology Maturation Plan (TMP) Process Guide  

Broader source: Energy.gov (indexed) [DOE]

U U U . . S S . . D D e e p p a a r r t t m m e e n n t t o o f f E E n n e e r r g g y y O O f f f f i i c c e e o o f f E E n n v v i i r r o o n n m m e e n n t t a a l l M M a a n n a a g g e e m m e e n n t t Technology Readiness Assessment (TRA) / Technology Maturation Plan (TMP) Process Guide March 2008 U.S. DOE Office of Environmental Management March 2008 TRA/TMP Process Guide Page 2 of 48 TABLE OF CONTENTS 1.0 INTRODUCTION ...................................................................................................................... 4 1.1 Document Purpose............................................................................................................................ 4 2.0 OVERVIEW OF TECHNOLOGY READINESS ASSESSMENTS AND TECHNOLOGY MATURATION PLANS ............................................................................................................

435

Preparation of acetaldehyde  

DOE Patents [OSTI]

Disclosed is a process for the preparation of acetaldehyde by the hydrogenation of ketene in the presence of a transition metal hydrogenation catalyst.

Tustin, Gerald Charles (Kingsport, TN); Depew, Leslie Sharon (Kingsport, TN)

1997-10-21T23:59:59.000Z

436

What Does Open-Data-Ready Look Like? Jeff Kaplan Senior Consultant, ICT Unit, Open ePolicy Solutions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Does Open-Data-Ready Does Open-Data-Ready Look Like? Jeff Kaplan - Senior Consultant, ICT Unit, Open ePolicy Solutions Email: jeff@openesolutions.com Twitter: @jeffkaplan88 Andrew Stott - UK Transparency Board, former UK Deputy CIO Email: andrew.stott@dirdigeng.com Twitter: @DirDigEng Workshop Intro 1. Workshop objective: Tool to assess readiness for an Open Data initiative 2. Why develop it? 3. How to develop it? 4. How to use it? Open Data Ecosystem Open Data Possible Readiness Categories Political leadership * Skills inside government * Skills outside government Policy & Legal Framework Financial requirements & funding * Organization & management in government * State of Data within government Demand for Data / Engagement Technical infrastructure requirements Reuse

437

Financing and current capacity for REDD+ readiness and monitoring, measurement, reporting and verification in the Congo Basin  

Science Journals Connector (OSTI)

...Katzourakis Financing and current capacity for REDD+ readiness and monitoring, measurement, reporting and verification in the Congo Basin Danae Maniatis Jerome Gaugris Danilo Mollicone Joel Scriven Alexis Corblin Cleto Ndikumagenge Andre Aquino Philippe Crete...

2013-01-01T23:59:59.000Z

438

Order Module--DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES  

Broader source: Energy.gov [DOE]

"The familiar level of this module is divided into three sections. In the first section we will discuss the purpose of DOE O 425.1D and the requirements for 1) determining the level of readiness...

439

DOE Zero Energy Ready Home Case Study, Mandalay Homes, Phoenix, AZ, Affordable  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Phoenix, AZ that scored HERS 58 without PV or HERS 38 with PV. This 1,700 ft2 affordable home has R-21 framed walls, a sealed closed-cell spray foamed attic, an air-source heat pump with forced air, and a solar combo system that provides PV, hot water, and space heating.

440

DOE Zero Energy Ready Home Case Study, Weiss Building & Development, LLC., System Home, River Forest, IL  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in River Forest, IL that scored HERS 17 without PV. This 4,763 ft2 custom passive house has R-54 ICF walls, a vented attic with R-100 blown fiberglass, plus R-40 rigid EPS under the slab, triple-pane windows, two ductless mini-split heat pumps, and redundant air sealing and flashing details.

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

DOE Challenge Home (Now Zero Energy Ready Home)- Building America Top Innovation  

Broader source: Energy.gov [DOE]

This Building America Innovations profile describes DOEs Builders Challenge. Hundreds of leading-edge builders across the country signed on to the Challenge and more than 14,000 homes earned the label, saving homeowners over $10 million a year in utility bills. DOEs new program, the DOE Challenge Home, increases the rigor of the guidelines including requiring homes to be Zero Net-Energy Ready.

442

DOE Zero Energy Ready Home Case Study, Clifton View Homes, Coupeville, WA, Systems Home  

Broader source: Energy.gov [DOE]

Case-study of a DOE Zero Energy Ready Home on Whidbey Island, WA, that scored HERS 45 without PV. This 2,908 ft2 custom/system home has a SIP roof and walls, R-20 rigid foam under slab, triple-pane windows, ground source heat pump for radiant floor heat, and a unique balanced ventilation system using separate exhaust fans to bring air into and out of home.

443

DOE Zero Energy Ready Home Case Study, Transformation, Inc., Production House, Devens, MA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Devens, MA that scored HERS 35 without PV or HERS -37 with PV. This 2,508 ft2 custom home has R-46 double-stud walls with opencell spray foam, a vented attic with R-67 blown cellulose, plus R-10 rigid XPS under the slab, R-20 closed-cell spray foam on basement walls, triple-pane windows, and one mini-split ductless heat pump.

444

DOE Zero Energy Ready Home Case Study, Transformations, Inc., Custom House, Devens, MA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Devens, MA that scored HERS 34 without PV or HERS -21 with PV. This 3,168 ft2 custom home has R-46 double-stud walls, a vented attic with R-67 blown cellulose, plus R-10 rigid XPS under the slab, R-20 closed-cell spray foam on basement walls, triple-pane windows, and mini-split ductless heat pumps.

445

DOE Zero Energy Ready Home Case Study, Ferguson Design and Construction, Inc., Sagaponak, NY, Custom Home  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Long Island, NY, that scored HERS 43 without PV. This 5,088 ft2 custom home has R-25 double-stud walls, a vaulted roof with R-40 blown cellulose, R-10 XPS under slab, a hydro air system with 91% efficient boiler for forced air and radiant floor heat, and 100% LED lights.

446

DOE Zero Energy Ready Home Case Study TC Legend, Seattle, WA, Custom Home  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Seattle, WA, that scored HERS 37 without PV, HERS -1 with PV. This 1,915 ft2 custom home has SIP walls and roof, R-20 XPS under the slab, triple-pane windows, an air to water heat pump for radiant heat, and balanced ventilation with timer controlled fans to bring in and exhaust air.

447

DOE Zero Energy Ready Home Case Study, Dwell Development, Seattle, WA, Systems Home  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Seattle, WA, that scored HERS 34 without PV. This 2,000 ft2 system home has R-45 double-stud walls, an unvented flat roof with 2 inches of spray foam plus 18 inches blown cellulose, R-42 XPS under slab, triple-pane windows, and a ductless mini-split heat pump.

448

DOE Zero Energy Ready Home Case Study, StreetScape Development, LLC, Libertyville, IL, Custom  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Libertyville, IL that scored HERS 45 without PV. This 2,763 ft2 custom home has advanced framed walls with R-20 of open-cell spray foam, R-49 open-cell spray-foam sealed attic, an HRV, and a tankless water heater for hydro coil furnace with high-velocity, small-diameter ducts.

449

15 Blog Posts to Get You Ready for Winter Savings | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

15 Blog Posts to Get You Ready for Winter Savings 15 Blog Posts to Get You Ready for Winter Savings 15 Blog Posts to Get You Ready for Winter Savings October 13, 2009 - 1:25pm Addthis Allison Casey Senior Communicator, NREL On Saturday, I woke up to three inches of snow on the ground. THREE INCHES! On October 10th! Despite having grown up in what one of my college roommates lovingly referred to as the "TUNDRA!" (a.k.a, Wisconsin, and yes, she spoke this word in horrified all-caps), I am opposed to winter. I mean, I get that winter should not go away. Climate change is bad. And things like skiing, ice skating, snow forts, and hot chocolate do make winter a bit more bearable. But it's just so... cold. And icy. And dark. Unfortunately, hibernation isn't really an option, and-in addition to extra doses of whining from yours truly-all of those cold, dark days can

450

File:CCS EA 2012 Web-ready.pdf | Open Energy Information  

Open Energy Info (EERE)

CCS EA 2012 Web-ready.pdf CCS EA 2012 Web-ready.pdf Jump to: navigation, search File File history File usage Metadata File:CCS EA 2012 Web-ready.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 3.74 MB, MIME type: application/pdf, 77 pages) Summary Coyote Canyon South Geothermal Exploration EA from 2012 Licensing PD This file has been released into the public domain by the copyright holder, its copyright has expired, or it is ineligible for copyright. This applies worldwide.

451

Analysis of Two Proposed Renewable Electricity Standards  

Gasoline and Diesel Fuel Update (EIA)

4 4 Impacts of a 25-Percent Renewable Electricity Standard as Proposed in the American Clean Energy and Security Act Discussion Draft April 2009 Energy Information Administration Office of Integrated Analysis and Forecasting U.S. Department of Energy Washington, DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should be attributed to the Energy Information Administration and should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Service Reports are prepared by the Energy Information Administration upon special request and are based on assumptions specified by

452

Proposed Strategy to meet DOE Order 231  

Broader source: Energy.gov (indexed) [DOE]

Page 1 Page 1 Proposed Strategy to meet DOE Order 231.1B, Preparation of Annual Site Environmental Reports Background The U.S. Department of Energy Office (DOE) of Legacy Management (LM) was established in 2003 to manage the Department's post-closure responsibilities at sites under LM's care and ensure the future protection of human health and the environment at those sites. The histories of the legacy sites vary, as does the regulatory regime under which the sites are managed. Long- term surveillance plans (LTSPs) are prepared for the majority of the sites. These LTSPs, which are available to the public, include site descriptions, information about site history, nature and extent of contamination, institutional controls, closeout condition of the site, present and future

453

Proposal Team: C. Burger  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

COMPLEX MATERIALS SCATTERING ( ) COMPLEX MATERIALS SCATTERING ( ) Proposal Team: C. Burger 1 , K. Cavicchi 2 , E. DiMasi 3 , A. Fluerasu 3 , S. Fraden 4 , M. Fukuto 3 , O. Gang 3 , B.S. Hsiao 1 , R.J. Kline 5 , S. Kumar 6 , O. Lavrentovich 6 , B. Ocko 3 , R. Pindak 3 , M. Rafailovich 1 , R.A. Register 7 , S. Sprunt 6 , H.H. Strey 1 , B.D. Vogt 8 , W.-L. Wu 5 , L. Wiegart 3 , K.G. Yager 3 1 Stony Brook University, 2 University of Akron, 3 Brookhaven National Lab, 4 Brandeis University, 5 NIST, 6 Kent State University, 7 Princeton University, 8 Arizona State University TECHNIQUES AND CAPABILITIES KEY CONCEPTS SELECTED APPLICATIONS * Small- and wide-angle x-ray scattering on 3PW source, in transmission and reflection mode: USAXS, SAXS, WAXS, GISAXS, GIXRD * High-throughput x-ray scattering for intelligent exploration of vast parameter spaces

454

Description of Proposed Action  

Broader source: Energy.gov (indexed) [DOE]

Carlsbad Field Office Carlsbad Field Office RECORD OF CATEGORICAL EXCLUSION DETERMINATION 1 Description of Proposed Action Performance of a three-dimensional seismic survey line on approximately 2,409 acres contained within the WIPP Land Withdrawal Area as part of a larger survey to determine whether hydrocarbons are present in the region in quantities that warrant extraction and development. Number and Title of Applicable Categorical Exclusion B3.1 Site Characterization/Environmental Monitoring Activities covered by this Categorical Exclusion include, but are not limited to, site characterization and environmental monitoring under CERCLA and RCRA. Specific activities include, but are not limited to: (a) Geological, geophysical (such as gravity, magnetic, electrical, seismic, and radar), geochemical, and

455

Operational Readiness Review Final Report for K Basin Fuel Transfer System  

SciTech Connect (OSTI)

An Operational Readiness Review (ORR) was conducted by the U.S. Department of Energy (DOE), Richland Operations Office (RL) to verify that an adequate state of readiness had been achieved for startup of the K Basin Fuel Transfer System (FTS). The DOE ORR was conducted during the period November 6-18, 2002. The DOE ORR team concluded that the K Basin Fuel Transfer System is ready to start operations, subject to completion and verification of identified pre-start findings. The ORR was conducted in accordance with the Spent Nuclear Fuel (SNF) K Basin Fuel Transfer System (FTS) Operational Readiness Review (ORR) Plan of Action and the Operational Readiness Review Implementation Plan for K Basin Fuel Transfer System. Review activities consisted of staff interviews, procedure and document reviews, and observations of normal facility operations, operational upset conditions, and an emergency drill. The DOE ORR Team also reviewed and assessed the adequacy of the contractor ORR3 and the RL line management review. The team concurred with the findings and observations identified in these two reports. The DOE ORR for the FTS evaluated the contractor under single-shift operations. Of concern to the ORR Team was that SNF Project management intended to change from a single-shift FTS operation to a two-shift operation shortly after the completion of the DOE ORR. The ORR team did not assess two-shift FTS operations and the ability of the contractor to conduct a smooth transition from shift to shift. However, the DOE ORR team did observe an operational upset drill that was conducted during day shift and carried over into swing shift; during this drill, swing shift was staffed with fewer personnel as would be expected for two-shift operations. The facility was able to adequately respond to the event with the reduced level of staff. The ORR Team was also able to observe a Shift Manager turnover meeting when one shift manager had to be relieved during the middle of the day. The ORR Team did not have the opportunity to observe a shift turnover from one crew to another. The ORR Team has evaluated the risk of not observing this activity and considers the risk to be minimal based on the fact that operating staff are very familiar with the FTS equipment and its procedures, and because existing Conduct of Operations processes and procedures are adequate and implemented. Because the ORR Team has not observed two-shift FTS operations, we recommend that additional RL oversight be provided at the start of two-shift FTS operations to evaluate the adequacy of crew turnovers.

DAVIES, T.H.

2002-10-01T23:59:59.000Z

456

Nuclear Energy Readiness Indicator Index (NERI): A benchmarking tool for assessing nuclear capacity in developing countries  

SciTech Connect (OSTI)

Declining natural resources, rising oil prices, looming climate change and the introduction of nuclear energy partnerships, such as GNEP, have reinvigorated global interest in nuclear energy. The convergence of such issues has prompted countries to move ahead quickly to deal with the challenges that lie ahead. However, developing countries, in particular, often lack the domestic infrastructure and public support needed to implement a nuclear energy program in a safe, secure, and nonproliferation-conscious environment. How might countries become ready for nuclear energy? What is needed is a framework for assessing a country's readiness for nuclear energy. This paper suggests that a Nuclear Energy Readiness Indicator (NERI) Index might serve as a meaningful basis for assessing a country's status in terms of progress toward nuclear energy utilization under appropriate conditions. The NERI Index is a benchmarking tool that measures a country's level of 'readiness' for nonproliferation-conscious nuclear energy development. NERI first identifies 8 key indicators that have been recognized by the International Atomic Energy Agency as key nonproliferation and security milestones to achieve prior to establishing a nuclear energy program. It then measures a country's progress in each of these areas on a 1-5 point scale. In doing so NERI illuminates gaps or underdeveloped areas in a country's nuclear infrastructure with a view to enable stakeholders to prioritize the allocation of resources toward programs and policies supporting international nonproliferation goals through responsible nuclear energy development. On a preliminary basis, the indicators selected include: (1) demonstrated need; (2) expressed political support; (3) participation in nonproliferation and nuclear security treaties, international terrorism conventions, and export and border control arrangements; (4) national nuclear-related legal and regulatory mechanisms; (5) nuclear infrastructure; (6) the utilization of IAEA technical assistance; (7) participation in regional arrangements; and (8) public support for nuclear power. In this paper, the Index aggregates the indicators and evaluates and compares the level of readiness in seven countries that have recently expressed various degrees of interest in establishing a nuclear energy program. The NERI Index could be a valuable tool to be utilized by: (1) country officials who are considering nuclear power; (2) the international community, desiring reassurance of a country's capacity for the peaceful, safe, and secure use of nuclear energy; (3) foreign governments/NGO's, seeking to prioritize and direct resources toward developing countries; and (4) private stakeholders interested in nuclear infrastructure investment opportunities.

Saum-Manning,L.

2008-07-13T23:59:59.000Z

457

Safety assessment of discharge chute isolation barrier preparation and installation  

SciTech Connect (OSTI)

This analysis examines activities associated with the installation of isolation barriers in the K Basins at the Hanford Reservation. This revision adds evaluation of barrier drops on stored fuel and basin floor, identifies fuel which will be moved and addresses criticality issues with sludge. The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparisons of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions was made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classifications.

Meichle, R.H.

1994-10-21T23:59:59.000Z

458

Oklahoma State University proposed Advanced Technology Research Center. Environmental Assessment  

SciTech Connect (OSTI)

The Department of Energy (DOE) has prepared an Environmental Assessment (EA) evaluating the construction and equipping of the proposed Advanced Technology Research Center (ATRC) at Oklahoma State University (OSU) in Stillwater, Oklahoma. Based on the analysis in the EA, the DOE has determined that the proposed action does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement is not required.

NONE

1995-06-01T23:59:59.000Z

459

Being Prepared to Borrow  

E-Print Network [OSTI]

Almost all farmers and ranchers rely on credit at times. Before approaching a lender, certain information must be gathered and decisions made. The 12 questions in this publication lead the prospective borrower through this preparation process....

Klinefelter, Danny A.

2003-01-06T23:59:59.000Z

460

BPA prepares for Jan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is a Statement of Intent? A Statement of Intent, or SOI, is a statement, prepared by BPA and signed by an eligible customer, that describes the approach and cost structure that...

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

PROCEDURE FOR PREPARING  

Broader source: Energy.gov (indexed) [DOE]

PROCEDURE FOR PREPARING PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS) Revision 1 November 1, 2007 Records Management Division, IM-23 PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS) 1. If the records have not yet been inventoried, see "Procedure for Conducting a Records Inventory." An inventory must be completed prior to preparing the RIDS. 2. The Records Inventory and Disposition Schedules (RIDS) should be reviewed and updated at least annually on DOE F 1324.10 and DOE F 1324.9. The RIDS covers all record, administrative and programmatic, as well as non- record material. The RIDS must include: a. Complete and detailed information identifying the organization (s) responsible for the records.

462

Preparing for the Future  

E-Print Network [OSTI]

tx H2O | pg. 12 Preparing for the Future Story by Kathy Wythe Preparing for the Future University establishes water management degree program Texas A&M University launched an interdisci-plinary water management degree programduring the fall... 2005 semester with 12 stu-dents seeking either master?s or doctorate degrees in water management and hydrologic sciences. The degree program, the first in Texas, includes 42 faculty members in 12 departments from four differ- ent colleges, said Ron...

Wythe, Kathy

2006-01-01T23:59:59.000Z

463

Yeast Immunofluorescence Prepare Cells  

E-Print Network [OSTI]

slide. Resuspend in up to 250 µl SPC buffer to prepare up to 5 slides. #12;Prepare Slide: 11. Use clean 15-well slide(s). Start with 25 µl of 2 mg/ml poly-D-lysine (Sigma P-1024) per slide. Pipet on and then off, leaving a thin film on slide well. Hold at room temperature for 1 minute. Wash slide using

Aris, John P.

464

Safety assessment of discharge chute isolation barrier preparation and installation activities. Revision 3  

SciTech Connect (OSTI)

This revision adds a section addressing impacts of dropping surfacing tool and rack cutter on the basin floor, and corrects typographical errors. The safety assessment is made for the activities for the preparation and installation of the discharge chute isolation barriers. The safety assessment includes a hazard assessment and comparisons of potential accidents/events to those addressed by the current safety basis documentation. No significant hazards were identified. An evaluation against the USQ evaluation questions was made and the determination made that the activities do not represent a USQ. Hazard categorization techniques were used to provide a basis for readiness review classifications.

Meichle, R.H.

1994-11-08T23:59:59.000Z

465

Workforce Retention Accomplishments Presentation - Sustainability Assessment of Workforce Well-Being and Mission Readiness  

Broader source: Energy.gov (indexed) [DOE]

Sustainability Assessment of Workforce Sustainability Assessment of Workforce Well-Being and Mission Readiness Jodi M. Jacobson, Ph.D., University of Maryland 2 Illness and Injury Lost Work Time Generational Divide Recruitment & Retention Competition Retirement & Aging Workforce Health & Well-Being Stress Depression & Anxiety Budget Cuts Technology Talent Management Work/Life Balance Safety Accountability Security Leadership Development Workforce Sustainability Chronic Health Conditions Globalization Critical Skills Shortage Job Skill Re-Alignment Job Transitioning Healthcare Costs YOU ARE NOT ALONE! 3 Indirect Costs  "You can"t manage what you can"t measure" (Dr. Ron Goetzel, Director, Institute for Health & Productivity Studies, Cornell University)

466

AVTA: Reports on Plug-in Electric Vehicle Readiness at 3 DOD Facilities  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following reports analyze data and survey results on readiness for the use of plug-in electric vehicles on the Naval Air Station Jacksonville, Naval Station Mayport, and Joint Base Lewis McChord, as informed by the AVTA's testing on plug-in electric vehicle charging equipment. This research was conducted by Idaho National Laboratory.

467

DOE Zero Energy Ready Home: Healthy Efficient Homes- Spirit Lake, Iowa  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Spirit Lake, Iowa, that scored HERS 41 without PV and HERS 28 with PV. This 3,048 ft2 custom home has advanced framed walls filled with 1.5 inches closed-cell spray foam, a vented attic with spray foam-sealed top plates and blown fiberglass over the ceiling deck. R-23 basement walls are ICF plus two 2-inch layers of EPS. The house also has a mini-split heat pump, fresh air fan intake, and a solar hot water heater.

468

Data Center Energy Efficiency and Renewable Energy Site Assessment: Anderson Readiness Center; Salem, Oregon  

SciTech Connect (OSTI)

This report summarizes the results from the data center energy efficiency and renewable energy site assessment conducted for the Oregon Army National Guard in Salem, Oregon. A team led by NREL conducted the assessment of the Anderson Readiness Center data centers March 18-20, 2014 as part of ongoing efforts to reduce energy use and incorporate renewable energy technologies where feasible. Although the data centers in this facility account for less than 5% of the total square footage, they are estimated to be responsible for 70% of the annual electricity consumption.

Metzger, I.; Van Geet, O.

2014-06-01T23:59:59.000Z

469

DOE Zero Energy Ready Home Case Study, Preferred Builders, Old Greenwich, CT, Custom  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Old Greenwich CT, that scored HERS 42 without PV or HERS 20 with PV. This 2,700 ft2 custom home has advanced framed walls with R-24 blown cellulose plus R-7.5 EPS rigid foam, membrane-coated OSB, a close-cell spray foamed attic, R-13 closed-cell spray foam under the slab and on basement walls, an ERV, and a gas boiler for forced air and radiant floor heat.

470

Review: Preparing for Climate Change  

E-Print Network [OSTI]

Review: Preparing for Climate Change By Michael D.Stephen, Preparing for Climate Change. A Boston Review Book.alkaline paper. Climate change is inevitable, but disaster

Kunnas, Jan

2013-01-01T23:59:59.000Z

471

EIS-0487: Notice of Intent to Prepare an Environmental Assessment |  

Broader source: Energy.gov (indexed) [DOE]

7: Notice of Intent to Prepare an Environmental Assessment 7: Notice of Intent to Prepare an Environmental Assessment EIS-0487: Notice of Intent to Prepare an Environmental Assessment This FERC EA will evaluate the potential environmental impacts of a proposal, Liquefaction Project involving construction and operation of facilities proposed by Freeport LNG Development, LP, Freeport LNG Expansion, LP, and FLNG Liquefaction LLC (collectively referred to as Freeport) in Brazoria County, Texas. This EA will be used by the Commission in its decision-making process to determine whether the project is in the public convenience and necessity. DOE is a cooperating agency. EIS-0487-EANOI-2011.pdf More Documents & Publications EIS-0487: Notice of Intent to Prepare an Environmental Impact Statement EIS-0488: Notice of Intent to Prepare an Environmental Impact Statement

472

EIS-0487: Notice of Intent to Prepare an Environmental Assessment |  

Broader source: Energy.gov (indexed) [DOE]

EIS-0487: Notice of Intent to Prepare an Environmental Assessment EIS-0487: Notice of Intent to Prepare an Environmental Assessment EIS-0487: Notice of Intent to Prepare an Environmental Assessment This FERC EA will evaluate the potential environmental impacts of a proposal, Liquefaction Project involving construction and operation of facilities proposed by Freeport LNG Development, LP, Freeport LNG Expansion, LP, and FLNG Liquefaction LLC (collectively referred to as Freeport) in Brazoria County, Texas. This EA will be used by the Commission in its decision-making process to determine whether the project is in the public convenience and necessity. DOE is a cooperating agency. EIS-0487-EANOI-2011.pdf More Documents & Publications EIS-0487: Notice of Intent to Prepare an Environmental Impact Statement EIS-0488: Notice of Intent to Prepare an Environmental Impact Statement

473

INT Summer School Proposal Lattice QCD for Nuclear Physics  

E-Print Network [OSTI]

INT Summer School Proposal Lattice QCD for Nuclear Physics Organizers Huey-Wen Lin Department of Nuclear Physics, Johann-Joachim-Becher-Weg 45 55099 Mainz, Germany meyerh@kph.uni-mainz.de David Richards techniques to the study of nuclear physics. The goal of this summer school is to educate and prepare the next

Washington at Seattle, University of - Department of Physics, Electroweak Interaction Research Group

474

ENERGY EFFICIENCY IN HOMES: AN INTRODUCTION AND STUDY PROPOSAL  

E-Print Network [OSTI]

ENERGY EFFICIENCY IN HOMES: AN INTRODUCTION AND STUDY PROPOSAL MAY 2, 2006 PREPARED BY MEMBERS;Weiss Urban Livability Fellowship Report ­ 1 ­ Energy Efficiency Overview and Case Study ENERGY EFFICIENCY: AN OVERVIEW In homes across the country, energy is wasted prolifically. In the winter, heat wafts

Crews, Stephen

475

Proposed Policies to Support the New Metro System in Qatar  

Science Journals Connector (OSTI)

Rapid urbanization and motorization around the world presents challenges to various countries, cities, and individual citizens. While the struggle in the Western world focuses on the battle with automobiles and their dominance in all aspects of daily lives, the developing countries in the Gulf, such as Qatar, face the dilemma of serving tremendous growth in the travel demand constrained by limited land and inferior infrastructure. Qatar is facing an unprecedented challenge to deal with rapid motorization and urbanization within the country. The paper presented some of Qatar's policies and projects that have been promoted by the government to address the fast growing transport demands in the country's urban areas with special reference to the Doha Metro Network, which will ultimately consist of four Metro lines with 98 stations serving the City of Doha. The metro's first phase is expected to be completed in 2020 in order to be ready for the Qatar 2022 FIFA Work Cup, while the final phase is expected to be completed in 2026. To ensure that a safe, integrated, responsive, and sustainable land transport system is provided, this paper proposed some strategies and approaches on land development, transportation accessibility, and transit service to be applied within the areas covered by the new Doha metro system. These proposed policies, if applied, will contribute to the success of the new metro system.

Khaled Shaaban; Rania F. Khalil

2012-01-01T23:59:59.000Z

476

DOE-HDBK-3012-2003; DOE Handbook Guide to Good Practices for Operational Readiness Reviews (ORR) Team Leader's Guide  

Broader source: Energy.gov (indexed) [DOE]

NOT MEASUREMENT NOT MEASUREMENT SENSITIVE DOE-HDBK-3012-2003 SUPERSEDING DOE-HDBK-3012-96 DOE HANDBOOK GUIDE TO GOOD PRACTICES FOR OPERATIONAL READINESS REVIEWS (ORR) TEAM LEADER'S GUIDE U.S. Department of Energy AREA MISC Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-HDBK-3012-2003 FOREWORD This Department of Energy handbook, Guide to Good Practices for Conducting Operational Readiness Reviews (ORR) Team Leader's Handbook, is approved for use by all DOE Components and their contractors. The guidance in this document is the distillation of the experience and lessons learned during numerous operational readiness reviews contributed by team leaders with a wide range of backgrounds. There are

477

Factors Influencing Readiness towards Halal Logistics among Food-based Logistics Players in Malaysia  

Science Journals Connector (OSTI)

Abstract Logistics is part of supply chain which involves many business entities such as suppliers, manufacturers, distributors and retailers. All these entities will work together to acquire raw materials and transform them into final products. Halal logistics is an approach to avoid contamination of perishable, raw materials and food products during transportation or distribution activities. It is also to avoid products missed information and to ensure that Muslim consumers will receive and consume only the Halalan Toyibban products. In Malaysian Standard for Halal Logistics (MS 2400:2010), halal logistics requirements according to Shariah law are including the requirement of logistics providers for transportation, warehousing and retailing. The requirement usually involved from processing to handling, distribution, storage, display, serving, packaging and labeling. There are few concerns regarding the implementation of halal logistics among logistics players. First, there is concern whether these players follow all guidelines and standards for halal logistics. Second, there is concern whether these players segregate their workers and facilities in producing and distributing activities for halal and non-halal products. This study seeks to investigate factors that influence readiness towards halal logistics among food-based logistics players. Face-to-face interviews were carried out with 156 managers representing logistics companies located in Peninsular Malaysia. Factor analysis was carried out to analyze the data obtained from the managers. The results revealed that support from management, enforcement of Halal Assurance System (HAS), environments controls, employee acceptance and company vision to change were the factors that influenced readiness towards halal logistics.

Hazwani Ahmad Tarmizi; Nitty Hirawaty Kamarulzaman; Ismail Abd Latiff; Azmawani Abd Rahman

2014-01-01T23:59:59.000Z

478

Use of Residual Solids from Pulp and Paper Mills for Enhancing Strength and Durability of Ready-Mixed Concrete  

SciTech Connect (OSTI)

This research was conducted to establish mixture proportioning and production technologies for ready-mixed concrete containing pulp and paper mill residual solids and to study technical, economical, and performance benefits of using the residual solids in the concrete. Fibrous residuals generated from pulp and paper mills were used, and concrete mixture proportions and productions technologies were first optimized under controlled laboratory conditions. Based on the mixture proportions established in the laboratory, prototype field concrete mixtures were manufactured at a ready-mixed concrete plant. Afterward, a field construction demonstration was held to demonstrate the production and placement of structural-grade cold-weather-resistant concrete containing residual solids.

Tarun R. Naik; Yoon-moon Chun; Rudolph N. Kraus

2003-09-18T23:59:59.000Z

479

Report of independent consultants reviewing Integrated Test Stands (ITS) performance and readiness of DARHT for construction start  

SciTech Connect (OSTI)

Independent consultants met at Los Alamos, June 15 and 16, 1993, to review progress on the commissioning of the Integrated Test Stand (ITS) for DARHT and to provide DOE with technical input on readiness for construction of the first radiographic arm of DARHT. The consultants concluded that all milestones necessary for demonstrating the performance of the DARHT accelerator have been met and that the project is ready for construction to resume. The experimental program using ITS should be continued to quantify the comparison of experiment and theory, to test improvements on the injector insulator, and to better evaluate the interaction of the beam and the target.

Not Available

1993-08-01T23:59:59.000Z

480

Preparation of vinyl acetate  

DOE Patents [OSTI]

This invention pertains to the preparation of vinyl acetate by contacting a mixture of hydrogen and ketene with a heterogeneous catalyst containing a transition metal to produce acetaldehyde, which is then reacted with ketene in the presence of an acid catalyst to produce vinyl acetate.

Tustin, Gerald Charles (Kingsport, TN); Zoeller, Joseph Robert (Kingsport, TN); Depew, Leslie Sharon (Kingsport, TN)

1998-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "readiness preparation proposals" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Preparation of vinyl acetate  

DOE Patents [OSTI]

This invention pertains to the preparation of vinyl acetate by contacting a mixture of hydrogen and ketene with a heterogeneous catalyst containing a transition metal to produce acetaldehyde, which is then reacted with ketene in the presence of an acid catalyst to produce vinyl acetate.

Tustin, G.C.; Zoeller, J.R.; Depew, L.S.

1998-03-24T23:59:59.000Z

482

CAREER FAIR PREPARATION &  

E-Print Network [OSTI]

, NJ #12;BEFORE THE CAREER FAIR · Prepare A Resume Create a resume using the "RBS Undergraduate New Brunswick Student Handbook" as a guide Have your resume reviewed by a Career Counselor Upload resume to Symplicity - RBS Undergraduate Office New Brunswick's career portal system Print plenty copies of your resume

Lin, Xiaodong

483

Death Valley Lower Carbonate Aquifer Monitoring Program Wells Down Gradient of the Proposed Yucca Mountain Nuclear Waste Repository, U. S. Department of Energy Grant DE-RW0000233 2010 Project Report, prepared by The Hydrodynamics Group, LLC for Inyo County Yucca Mountain Repository Assessment Office  

SciTech Connect (OSTI)

Inyo County completed the first year of the U.S. Department of Energy Grant Agreement No. DE-RW0000233. This report presents the results of research conducted within this Grant agreement in the context of Inyo County's Yucca Mountain oversight program goals and objectives. The Hydrodynamics Group, LLC prepared this report for Inyo County Yucca Mountain Repository Assessment Office. The overall goal of Inyo County's Yucca Mountain research program is the evaluation of far-field issues related to potential transport, by ground water, of radionuclide into Inyo County, including Death Valley, and the evaluation of a connection between the Lower Carbonate Aquifer (LCA) and the biosphere. Data collected within the Grant is included in interpretive illustrations and discussions of the results of our analysis. The centeral elements of this Grant prgoram was the drilling of exploratory wells, geophysical surveys, geological mapping of the Southern Funeral Mountain Range. The cullimination of this research was 1) a numerical ground water model of the Southern Funeral Mountain Range demonstrating the potential of a hydraulic connection between the LCA and the major springs in the Furnace Creek area of Death Valley, and 2) a numerical ground water model of the Amargosa Valley to evaluate the potential for radionuclide transport from Yucca Mountain to Inyo County, California. The report provides a description of research and activities performed by The Hydrodynamics Group, LLC on behalf of Inyo County, and copies of key work products in attachments to this report.

King, Michael J; Bredehoeft, John D., Dr.

2010-09-03T23:59:59.000Z

484

Proposal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MiniBooNE Antineutrino Data Taking The MiniBooNE Collaboration (Dated: February 4, 2009) 1 EXECUTIVE SUMMARY The MiniBooNE experiment at Fermilab was designed to test the LSND...

485

Proposals  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

486

Proposed Rules DEPARTMENT OF ENERGY  

Broader source: Energy.gov (indexed) [DOE]

4 Federal Register 4 Federal Register / Vol. 76, No. 1 / Monday, January 3, 2011 / Proposed Rules DEPARTMENT OF ENERGY [Docket ID: DOE-HQ-2010-0002] 10 CFR Part 1021 RIN 1990-AA34 National Environmental Policy Act Implementing Procedures AGENCY: Office of the General Counsel, U.S. Department of Energy. ACTION: Notice of proposed rulemaking and public hearing. SUMMARY: The U.S. Department of Energy (DOE or the Department) proposes to amend its existing regulations governing compliance with the National Environmental Policy Act (NEPA). The majority of the changes are proposed for the categorical exclusions provisions contained in its NEPA Implementing Procedures, with a small number of related changes proposed for other provisions. These proposed changes are intended to better align the

487

STUDENT ADVISOR GUIDELINES PROPOSAL: ASSESSMENTS OF AND PROPOSED CHANGES  

E-Print Network [OSTI]

STUDENT ADVISOR GUIDELINES PROPOSAL: ASSESSMENTS OF AND PROPOSED CHANGES TO THE NJIT ADVISING PROCESS NEW JERSEY INSTITUTE OF TECHNOLOGY STUDENT SENATE STUDENT ADVISOR GUIDELINES COMMITTEE DECEMBER of NJIT as a whole. -2- #12;I. Students' Views of Advisors Obligations These are the recommendations

Bieber, Michael

488

EIS-0411: Notice of Intent to Prepare an Environmental Impact Statement |  

Broader source: Energy.gov (indexed) [DOE]

Intent to Prepare an Environmental Impact Intent to Prepare an Environmental Impact Statement EIS-0411: Notice of Intent to Prepare an Environmental Impact Statement Construction, Operation, and Maintenance of the Proposed Transmission Agency of Northern California Transmission Project, California Notice of Intent to prepare an environmental impact statement for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California. Western Area Power Administration Construction, Operation, and Maintenance of the Proposed Transmission Agency of Northern California Transmission Project, California, DOE/EIS-0411 (February 2009) 74 FR 8086 More Documents & Publications EIS-0411: Notice of Cancellation of the Environmental Impact Statement

489

BPA revises oversupply rate proposal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

oversupply-rate-proposal Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives...

490

OVERVIEW OF PROPOSED TRANSPORTATION ENERGY  

E-Print Network [OSTI]

.......................................................................................................................4 PROPOSED CALIFORNIA TRANSPORTATION FUEL PRICE FORECASTS......... 6 Summary....................................................................................................6 Petroleum Transportation Fuel Price Forecast Assumptions .............................................................6 California Transportation Fuel Price Forecasts

491

EA-1779: Proposed Changes to the Sanitary Biosolids Land Application  

Broader source: Energy.gov (indexed) [DOE]

79: Proposed Changes to the Sanitary Biosolids Land 79: Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee EA-1779: Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee Summary This EA evaluates the environmental impacts of a proposal to amend (e.g., by changing setback requirements from surface water features and potential channels to groundwater) the Sanitary Biosolids Land Application Program at the Oak Ridge Reservation in Oak Ridge, Tennessee. Base on the analyses in the EA, DOE determined that the proposed action is not a major federal action that would significantly affect the quality of the human environment within the context of NEPA, and that preparation of an environmental impact statement is not required.

492

Internal Audit Preparation Worksheet  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 ILT Course Support Checklist 10_0630 Page 1 of 4 5 ILT Course Support Checklist 10_0630 Page 1 of 4 EOTA - Business Form Document Title: ILT/Exercise Initial Preparation Checklist Document Number: ISDF-015 Rev. 10_0630 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: ISDP-002, Training Production Process Notify of Changes: EOTA Employees Referenced Document(s): ITTP-012 Graphic Design Support Process, ISDF-018 Course Roster ISDF-008 ILT Student Feedback Survey ISDF-015 ILT Course Support Checklist 10_0630 Page 2 of 4 Revision History: Rev. Description of Change A Initial Release 10_0630 Modified to accompany TPP ISDF-015 ILT Course Support Checklist 10_0630 Page 3 of 4 ILT/Exercise Initial Preparation Checklist Anticipated

493

Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Uinit Contractor Operational Readiness Review, June 2012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contractor Contractor Operational Readiness Review June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2 4.0 Results ................................................................................................................................................... 2

494

Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Uinit Contractor Operational Readiness Review, June 2012  

Broader source: Energy.gov (indexed) [DOE]

Contractor Contractor Operational Readiness Review June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2 4.0 Results ................................................................................................................................................... 2

495

Expressive participation in Internet social movements: Testing the moderating effect of technology readiness and sex on student SNS use  

Science Journals Connector (OSTI)

An understanding of students' use of social networking sites (SNS) for expressive participation in Internet Social Movements (ISMs) is absent in the literature on the social psychology of student social networking behavior. Using the Unified Theory of ... Keywords: Gender, Internet social movement, Sex, Social networking sites, Technology readiness, UTAUT

Juan D. Borrero; Shumaila Y. Yousafzai; Uzma Javed; Kelly L. Page

2014-01-01T23:59:59.000Z

496

Financing and current capacity for REDD+ readiness and monitoring, measurement, reporting and verification in the Congo Basin  

Science Journals Connector (OSTI)

...measurement, reporting and verification in the Congo Basin Danae Maniatis 1 2 Jerome Gaugris...current capacity for REDD+ readiness in the Congo Basin, with a particular focus on the...amount of REDD+ financing flows into the Congo Basin (US$550 million or almost half...

2013-01-01T23:59:59.000Z

497

The role of technology readiness in consumers' adoption of mobile internet services between South Korea and China  

Science Journals Connector (OSTI)

This study built a causal model using the technology readiness and acceptance model TRAM to identify the factors influencing the adoption of mobile internet services in South Korea and China. In order to compare South Korea and China, a survey was conducted ...

Jong Chul Oh; Sung Joon Yoon; Namho Chung

2014-05-01T23:59:59.000Z

498

Getting Ready for LEDs: LED Lighting Video Series Explains the Basics |  

Broader source: Energy.gov (indexed) [DOE]

for LEDs: LED Lighting Video Series Explains the for LEDs: LED Lighting Video Series Explains the Basics Getting Ready for LEDs: LED Lighting Video Series Explains the Basics November 26, 2012 - 3:09pm Addthis Part 1 of the ElectricTV.net video series. Part 2 of the ElectricTV.net video series. Roland Risser Roland Risser Program Director, Building Technologies Office How can I participate? Learn more about the advantages and accessiblity of LED lighting from this series of videos. If you haven't been down the lighting aisle of your favorite home improvement store lately, you may be surprised at how many LED lighting products have arrived. Solid-state lighting (LEDs are one type) will soon have a strong impact on how buildings and homes are lit, in part because of its potential to reduce U.S. lighting energy usage by nearly one half.

499

Building America Top Innovations 2013 Profile … Zero Energy-Ready Single-Family Homes  

Broader source: Energy.gov (indexed) [DOE]

to purchase and install. to purchase and install. Much of Building America's research is aimed directly at the goal of constructing high-performance homes and many of the Building America research teams have been directly involved with builders who are constructing zero energy or zero energy-ready homes. Here are just a few examples. The Consortium for Advanced Residential Buildings, operated by Steven Winter Associates, worked with Preferred Builders, Inc., on a high-performance test home in Old Greenwich, CT. Technologies and strategies used in the "Performance House" were not cutting-edge, but simply "best practices practiced." Closed-cell spray foam insulated the unvented attic and the interior of the foundation wall and wrapped the underside and sides of the slab while 1.5 inches of rigid foam sheathing covered the

500

Super efficient refrigeration systems: Two non-CFC designs ready for commercialization  

SciTech Connect (OSTI)

Two high-efficiency prime movers for refrigeration are ready for field testing and commercialization. Either machine, combined with other advanced measures, could result in a CFC-free refrigerator using significantly less energy than units meeting the 1993 US efficiency standards. The first design is a linear motor/compressor that manufacturers could substitute for the standard rotating motor/compressor in a conventional refrigerator. The second design is a Stirling-cycle refrigeration machine that is self contained and uses helium gas as the working fluid. The results of prototype testing, the inherent simplicity of both machines, and their virtually frictionless operation point to economical and reliable service. If these features are confirmed in further testing now being conducted by appliance and compressor manufacturers, these machines will be strong candidates for inclusion in super efficient refrigerator designs over the next few years.

Stickney, B.L.

1992-12-31T23:59:59.000Z