Powered by Deep Web Technologies
Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

2012 SG Peer Review - Recovery Act: NSTAR Automated Mater Reading Based Dynamic Pricing - Douglas Horton, NSTAR Electric & Gas  

Broader source: Energy.gov (indexed) [DOE]

Peer Peer Review Meeting Peer Review Meeting AMR Based Dynamic Pricing y g Doug Horton NSTAR Electric & Gas Co. 6/8/2012 AMR Based Dynamic Pricing Objective Provide two-way communication of electricity cost & consumption data utilizing the customers existing meter & Internet. Goal to achieve 5% reduction in peak and Goal to achieve 5% reduction in peak and average load. Life-cycle Funding ($K) Total Budget Total DOE Funding to Technical Scope Use customer's existing AMR meter and broadband Internet to achieve two way Total Budget Total DOE Funding Funding to Date $4,900k $2,362k $1,623k broadband Internet to achieve two way communication and "AMI" functionality Cutting-edge solution to integrate: * Existing meters E i ti I t t December 2008 * Existing Internet * Existing billing & CIS

2

Nstar | Open Energy Information  

Open Energy Info (EERE)

Nstar Nstar Jump to: navigation, search Logo: Nstar Name Nstar Address One NSTAR Way Place Westwood, Massachusetts Zip 02090 Product Utilities Number of employees 1001-5000 Website http://www.nstar.com/business/ Coordinates 42.204066°, -71.159901° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.204066,"lon":-71.159901,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

3

NSTAR | Open Energy Information  

Open Energy Info (EERE)

NSTAR NSTAR Jump to: navigation, search Name NSTAR Place Westwood, Massachusetts Zip 2090 Product A Massachusetts-based utility. Coordinates 40.991995°, -74.035644° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.991995,"lon":-74.035644,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

4

NSTAR Electric | Open Energy Information  

Open Energy Info (EERE)

NSTAR Electric NSTAR Electric Address One NSTAR Way Place Westwood, Massachusetts Zip 02090 Sector Services Product Green Power Marketer Website http://www.nstar.com/ Coordinates 42.204066°, -71.159901° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.204066,"lon":-71.159901,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

5

NSTAR Electric Company | Open Energy Information  

Open Energy Info (EERE)

(Redirected from Boston Edison Company) (Redirected from Boston Edison Company) Jump to: navigation, search Name NSTAR Electric Company Place Norfolk, Massachusetts Service Territory Massachusetts Website www.nstar.com/residential Green Button Landing Page www.nstar.com/residential Green Button Reference Page www.nstar.com/ss3/nstar_n Green Button Implemented Yes Utility Id 54913 Utility Location Yes Ownership I NERC Location NPCC NERC NPCC Yes ISO NE Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] SGIC[2] Energy Information Administration Form 826[3] LinkedIn Connections CrunchBase Profile No CrunchBase profile.

6

NSTAR Electric Company | Open Energy Information  

Open Energy Info (EERE)

Place Norfolk, Massachusetts Place Norfolk, Massachusetts Service Territory Massachusetts Website www.nstar.com/residential Green Button Landing Page www.nstar.com/residential Green Button Reference Page www.nstar.com/ss3/nstar_n Green Button Implemented Yes Utility Id 54913 Utility Location Yes Ownership I NERC Location NPCC NERC NPCC Yes ISO NE Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] SGIC[2] Energy Information Administration Form 826[3] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. NSTAR Electric Company Smart Grid Project was awarded $10,061,883 Recovery

7

NSTAR (Electric) - Business Solutions Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

NSTAR (Electric) - Business Solutions Program NSTAR (Electric) - Business Solutions Program NSTAR (Electric) - Business Solutions Program < Back Eligibility Agricultural Commercial Construction Fed. Government Industrial Institutional Local Government Nonprofit Schools State Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Manufacturing Other Construction Heat Pumps Appliances & Electronics Commercial Lighting Lighting Maximum Rebate Contact NSTAR Program Info State Massachusetts Program Type Utility Rebate Program Rebate Amount New Construction Custom: Contact NSTAR Municipalities: Contact NSTAR Lighting (Custom): $0.40/watt reduction (Tier 1); $1/watt reduction (Tier 2) Fluorescent Fixtures: $10 - $30 LED Lighting (Downlights): $10 - $30 LED Lighting (Refrigeration): $45

8

NSTAR (Electric) - Small Business Direct Install Program | Department of  

Broader source: Energy.gov (indexed) [DOE]

NSTAR (Electric) - Small Business Direct Install Program NSTAR (Electric) - Small Business Direct Install Program NSTAR (Electric) - Small Business Direct Install Program < Back Eligibility Commercial Local Government Nonprofit State Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Other Home Weatherization Commercial Weatherization Sealing Your Home Ventilation Manufacturing Heat Pumps Appliances & Electronics Commercial Lighting Lighting Program Info State Massachusetts Program Type Utility Rebate Program Rebate Amount Up to 70% of the total project cost Provider NSTAR The NSTAR Small Business Solutions Program offers incentives for business customers whose average monthly demand is 300 kW or less. The first step of the program is a free energy audit to identify potential energy saving

9

NSTAR (Gas) - Commercial Energy Efficiency Programs | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

NSTAR (Gas) - Commercial Energy Efficiency Programs NSTAR (Gas) - Commercial Energy Efficiency Programs NSTAR (Gas) - Commercial Energy Efficiency Programs < Back Eligibility Commercial Industrial Savings Category Heating & Cooling Commercial Heating & Cooling Heating Other Appliances & Electronics Commercial Weatherization Water Heating Program Info State Massachusetts Program Type Utility Rebate Program Rebate Amount Forced Hot Water Boilers: $500-$15,000 Boiler Reset Controls: $225 Condensing Unit or Water Heater: $500 On-Demand Unit Heater: $1000 or $1600 Warm Air Furnaces: $400-$800 Indirect Water Heater/Boiler: $400 Tankless Water Heater: $500 or $800 Storage Water Heaters: $50 or $100 Low Intensity Infrared Heating Units: $500 High Efficiency Cooking Equipment: up to $1,000 Steam Traps: $25 Programmable Thermostats: $25

10

NSTAR Electric Company Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Company Smart Grid Project Company Smart Grid Project Jump to: navigation, search Project Lead NSTAR Electric Company Country United States Headquarters Location Norfolk, Massachusetts Recovery Act Funding $10,061,883.00 Total Project Value $20,123,766.00 Coverage Area Coverage Map: NSTAR Electric Company Smart Grid Project Coordinates 42.1195426°, -71.3250563° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

11

NSTAR Electric & Gas Corporation Smart Grid Demonstration Project | Open  

Open Energy Info (EERE)

NSTAR Electric & Gas Corporation NSTAR Electric & Gas Corporation Country United States Headquarters Location Westwood, Massachusetts Recovery Act Funding $2,362,000.00 Total Project Value $4,724,000.00 Coordinates 42.2139873°, -71.2244987° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

12

NSTAR Electric & Gas Corporation Smart Grid Demonstration Project (2) |  

Open Energy Info (EERE)

Lead NSTAR Electric & Gas Corporation Lead NSTAR Electric & Gas Corporation Country United States Headquarters Location Westwood, Massachusetts Recovery Act Funding $5,267,592.00 Total Project Value $10,535,184.00 Coordinates 42.2139873°, -71.2244987° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

13

DOE Zero Energy Ready Home Consolidated Renewable Energy Ready...  

Energy Savers [EERE]

Consolidated Renewable Energy Ready Checklist DOE Zero Energy Ready Home Consolidated Renewable Energy Ready Checklist All homes certified as DOE Zero Energy Ready Homes must meet...

14

Community Readiness Project Helps State Get Ready for Electric...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Community Readiness Project Helps State Get Ready for Electric Vehicles Community Readiness Project Helps State Get Ready for Electric Vehicles April 10, 2013 - 12:00am Addthis In...

15

Test Automation Test Automation  

E-Print Network [OSTI]

Test Automation Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2013 Mousavi: Test Automation #12;Test Automation Outline Test Automation Mousavi: Test Automation #12;Test Automation Why? Challenges of Manual Testing Test-case design: Choosing inputs

Mousavi, Mohammad

16

Technology Readiness Assessment Report  

Broader source: Energy.gov [DOE]

This document has been developed to guide individuals and teams that will be involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the...

17

Beamline Commissioning Readiness Review Team  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ES&H and User Safety Officer T. Kruy AES Front Ends Readiness G. Markovich AES PSS & EPS Readiness M. Merritt AES Insertion Device Readiness M. Ramanathan AES CCSM & Chair AES...

18

TECHNOLOGY READINESS ASSESSMENT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DECEMBER 2012 DECEMBER 2012 Pathway for readying the next generation of affordable clean energy technology -Carbon Capture, Utilization, and Storage (CCUS) 2012 TECHNOLOGY READINESS ASSESSMENT -OVERVIEW 2 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 3 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal li- ability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific

19

Technology Readiness Assessment Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Guide assists individuals and teams involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the DOE capital asset projects subject to DOE O 413.3B. Cancels DOE G 413.3-4.

2011-09-15T23:59:59.000Z

20

Emergency Readiness Assurance Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish the requirements of the Emergency Readiness Assurance Program with a goal of assurting that the Department of Energy (DOE) Emergency Management System (EMS) is ready to respond promptly, efficiently, and effectively to any emergency involving DOE facilities or requiring DOE assistance. Cancels DOE O 5500.10 dated 4-30-91. Chg 1 dated 2-27-92. Change 1 canceled by DOE O 151.1 of 9-25-95.

1992-02-27T23:59:59.000Z

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

PeopleSoft HR ECR Automation Process  

E-Print Network [OSTI]

PeopleSoft HR ECR Automation Process Employee Work Hours Change (Temporary Basis) May 2012 #12 Documentation May, 2012 When the Originator is ready to create an Hours Change Request using the automated ECR the instructions below: - Home > Employee Change Request (ECR) > Use > ECR Create · If you know the Name or Eagle

Huang, Jianyu

22

PeopleSoft HR ECR Automation Process  

E-Print Network [OSTI]

PeopleSoft HR ECR Automation Process Leave of Absence May 2012 #12;2 Table of Contents Create the Originator is ready to create a Leave of Absence using the automated ECR process, he/she will follow the menu navigation below to access the employee search page and then use the instructions below: - Home > Employee

Huang, Jianyu

23

Technology Readiness Assessments | Department of Energy  

Office of Environmental Management (EM)

Technology Readiness Assessments Technology Readiness Assessments Documents Available for Download August 1, 2013 Technology Readiness Assessment (TRA)Technology Maturation Plan...

24

Construction Readiness RM  

Broader source: Energy.gov (indexed) [DOE]

Construction Readiness Review Module Construction Readiness Review Module March 2010 CD- [This Rev Readiness -0 view Module w s Review (CRR OFFICE O CD-1 was used to dev R). This Review OF ENVIRO Standard R Construc Rev Critical D CD-2 M velop the Revie w Module cont ONMENTA Review Pla ction Rea view Modul Decision (CD C March 2010 ew Plan for Sal tains the lesson Review.] AL MANAG an (SRP) adiness le D) Applicabili D-3 lt Waste Proce ns learned from GEMENT ity CD-4 ssing Facility ( m the SWPF Co Post Ope (SWPF) Const onstruction Re eration truction eadiness Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental

25

Technology Readiness Assessment Report  

Broader source: Energy.gov (indexed) [DOE]

Technology Readiness Assessment Report Technology Readiness Assessment Report March 2010 U U . . S S . . D D e e p p a a r r t t m m e e n n t t o o f f E E n n e e r r g g y y O O f f f f i i c c e e o o f f E E n n v v i i r r o o n n m m e e n n t t a a l l M M a a n n a a g g e e m m e e n n t t Technology Readiness Assessment (TRA) / Technology Maturation Plan (TMP) Process Guide March 2008 U.S. DOE Office of Environmental Management March 2008 TRA/TMP Process Guide Page 2 of 48 TABLE OF CONTENTS 1.0 INTRODUCTION ...................................................................................................................... 4 1.1 Document Purpose............................................................................................................................ 4 2.0 OVERVIEW OF TECHNOLOGY READINESS ASSESSMENTS AND TECHNOLOGY MATURATION PLANS

26

DOE Zero Energy Ready Home Resources  

Broader source: Energy.gov [DOE]

DOE Zero Energy Ready Home provides resources for successfully building and selling zero-energy ready homes in today's market.

27

HIGHLY AUTOMATED MACROMOLECULAR  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AUTOMATED MACROMOLECULAR AUTOMATED MACROMOLECULAR CRYSTALLOGRAPHY BEAMLINE (AMX) Group Leader: Dieter Schneider Proposal Team: M. Allaire 1 , L. Berman 1 , M. Chance 2 , W. Hendrickson 3 , A. Héroux 1 , J. Jakoncic 1 , A. Orville 1 , H. Robinson 1 , D. Schneider 1 , W. Shi 2 , A. Soares 1 , V. Stojanoff 1 , R. Sweet 1 1 Brookhaven National Laboratory, 2 Case Western Reserve University, 3 Columbia University MISSION APPLICATIONS AND CAPABILITIES ADDITIONAL INFORMATION * AMX at NSLS-II will provide structural biologists with ready access to an advanced macromolecular crystallography (MX) beamline for the elucidation of structure and function of macromolecular complexes. * Its high flux, tunable energy, and natively small focal spot will make it a crystallographer's preferred beamline. * Its high degree of automation will provide a high throughput

28

Readiness Review RM  

Broader source: Energy.gov (indexed) [DOE]

Readiness Review Module Readiness Review Module March 2010 CD-0 O 0 OFFICE OF C CD-1 F ENVIRO Standard R Readin Rev Critical Decis CD-2 M ONMENTAL Review Plan ness Rev view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) view e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-

29

Readiness Review Program  

Broader source: Energy.gov (indexed) [DOE]

Review Program Review Program FUNCTIONAL AREA GOAL: DOE/NNSA Headquarters and Field organizations and their contractors responsible for the startup and operation of nuclear facilities have defined and implemented contractual requirements to manage, evaluate, and approve the startup and restart of nuclear facilities and activities. REQUIREMENTS:  DOE Order 425.1C, Startup and Restart of Nuclear Facilities  DOE P 450.4, Safety Management System Policy  DOE/NNSA Safety Management Functions, Responsibilities and Authorities Manual Guidance:  DOE-STD-3006-2000, Planning and Conduct of Operational Readiness Reviews  DOE-HDBK- 3012-2003, Operational Readiness Review Team Leaders Handbook  DOE G 450.4-1B, Integrated Safety Management System Guide

30

Readiness Review Training - Member | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Member Member Readiness Review Training - Member November 10, 2010 Readiness Review Member Training at the Idaho National Laboratory Course provides tools and tips to be an effective readiness review team member. Topics include: An understanding of the background behind the Readiness Review Process; Training in the mechanics of performance and reporting of a Readiness Review; Knowledge of current DOE Orders, Directives, and References for the Readiness Review process; Training in Performance-Based Assessment Processes and Official DOE Team Member Readiness Review Training Methods Readiness Review Training - Member More Documents & Publications Readiness Review Training - Team Leader Readiness Review Training - Development of Criteria And Review Approach Documents

31

Ready, set, go . . . well maybe  

E-Print Network [OSTI]

at the 2011 Applied Ergonomics Conference By Melaniesustainable? Case study of ergonomics program that was notwas not! Case study of ergonomics program that was ready

Alexandre, Melanie M

2011-01-01T23:59:59.000Z

32

Readiness Review | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is documented on a Readiness Review Activity Approval Form. Once the agreed upon conditions and requirements are met the review is finalized through Operational Approval...

33

Clean Cities: Electric Vehicle Community Readiness Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Financial Opportunities Financial Opportunities Printable Version Share this resource Send a link to Clean Cities: Electric Vehicle Community Readiness Projects to someone by E-mail Share Clean Cities: Electric Vehicle Community Readiness Projects on Facebook Tweet about Clean Cities: Electric Vehicle Community Readiness Projects on Twitter Bookmark Clean Cities: Electric Vehicle Community Readiness Projects on Google Bookmark Clean Cities: Electric Vehicle Community Readiness Projects on Delicious Rank Clean Cities: Electric Vehicle Community Readiness Projects on Digg Find More places to share Clean Cities: Electric Vehicle Community Readiness Projects on AddThis.com... Current Opportunities Related Opportunities Funded Projects Recovery Act Projects Community Readiness Projects Alternative Fuel Market Projects

34

Solar Ready: An Overview of Implementation Practices  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

that solar ready itself does not reduce energy use or replace conventional energy with green energy. Solar ready does not contribute toward carbon emissions reduction until...

35

Wind Offshore Port Readiness | Department of Energy  

Office of Environmental Management (EM)

Wind Offshore Port Readiness Wind Offshore Port Readiness This study will aid decision-makers in making informed decisions regarding the choice of ports for specific offshore...

36

Readiness Review Training - Member | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

- Member November 10, 2010 Readiness Review Member Training at the Idaho National Laboratory Course provides tools and tips to be an effective readiness review team member....

37

Marine & Hydrokinetic Technology Readiness Initiative TIDAL ENERGY...  

Office of Scientific and Technical Information (OSTI)

Marine & Hydrokinetic Technology Readiness Initiative TIDAL ENERGY SYSTEM FOR ON-SHORE POWER GENERATION Marine & Hydrokinetic Technology Readiness Initiative DE-EE0003636 TIDAL...

38

Question and Answers Alternative Fuel Readiness Plans  

E-Print Network [OSTI]

Question and Answers Alternative Fuel Readiness Plans PON-13-603 September 3, 2013 Eligibility Q1 to readiness plans? A1 This solicitation is limited to readiness planning only for alternative fuels. Q2 In regards to PON-13-603 - Alternative Fuel Readiness Plans, is electricity used for transportation

39

Physical Activity Readiness Medical Examination  

E-Print Network [OSTI]

Conveyance/Referral: NAME ______________________________________________________ ADDRESS or prescribed exercise. · Physical Activity Readiness Conveyance/Referral Form - an optional tear-off tab for the physician to convey clearance for physical activity participation, or to make a referral to a medically

Waterloo, University of

40

Hydrogen Infrastructure Market Readiness Workshop  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) hosted the Hydrogen Infrastructure Market Readiness Workshop February 1617, 2011, in Washington, D.C....

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

An Overview of Readiness for REDD: A compilation of readiness activities  

Open Energy Info (EERE)

An Overview of Readiness for REDD: A compilation of readiness activities An Overview of Readiness for REDD: A compilation of readiness activities prepared on behalf of the Forum on Readiness for REDD Jump to: navigation, search Tool Summary LAUNCH TOOL Name: An Overview of Readiness for REDD: A compilation of readiness activities prepared on behalf of the Forum on Readiness for REDD Agency/Company /Organization: The Woods Hole Research Center Sector: Land Focus Area: Forestry Topics: Implementation, Policies/deployment programs Resource Type: Lessons learned/best practices Website: www.cbd.int/forest/doc/overview-readiness-redd.pdf An Overview of Readiness for REDD: A compilation of readiness activities prepared on behalf of the Forum on Readiness for REDD Screenshot References: Overview of REDD[1] Background "This background document aims to provide a snapshot view of readiness

42

Houston Smart Grid System Almost Ready for Launch | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Smart Grid System Almost Ready for Launch Smart Grid System Almost Ready for Launch Houston Smart Grid System Almost Ready for Launch October 8, 2010 - 11:29am Addthis CenterPoint Energy employees are installing smart meters and automated distribution equipment in the company’s electric grid in Houston, Texas. | Photo courtesy of CenterPoint Energy CenterPoint Energy employees are installing smart meters and automated distribution equipment in the company's electric grid in Houston, Texas. | Photo courtesy of CenterPoint Energy Kevin Craft What does this mean for me? The AMS/IG initiative supports 588 jobs, half of which would not have existed had the company not received money from the Recovery Act. Once their smart meter is installed, consumers are able to access the Smart Meter Texas Portal online to obtain updates on their daily energy

43

Automation Status  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NREL Manufacturing R&D Workshop NREL Manufacturing R&D Workshop NREL H2/FC Manufacturing R&D Workshop Automation Status Garry Sperrick garry@sperkllc.com 585-259-0311 August 11, 2011 Automation Status NREL Manufacturing R&D Workshop Presentation Overview ƒ Brief Introduction ƒ DOE / NREL - Review & Discussion ƒ Automation Platforms ƒ Automation Processes ƒ Automation Considerations of the Manufacturer ƒ Manufacturer and the Supplier ƒ Three (3) Automation Programs Following these Guidelines ƒ Automotive Component Manufacturing ƒ Medical Manufacturing ƒ Membrane Electrode Assembly Manufacturing ƒ Hypothetical Fuel Cell Manufacturing Platforms August 11, 2011 Automation Status NREL Manufacturing R&D Workshop Professional Bio ƒ Automation Technician - Mobil Chemical

44

Home Automation  

E-Print Network [OSTI]

In this paper I briefly discuss the importance of home automation system. Going in to the details I briefly present a real time designed and implemented software and hardware oriented house automation research project, capable of automating house's electricity and providing a security system to detect the presence of unexpected behavior.

Ahmed, Zeeshan

2010-01-01T23:59:59.000Z

45

Test Automation Ant JUnit Test Automation  

E-Print Network [OSTI]

Test Automation Ant JUnit Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2012 Mousavi: Test Automation #12;Test Automation Ant JUnit Outline Test Automation Ant JUnit Mousavi: Test Automation #12;Test Automation Ant JUnit Why? Challenges of Manual Testing

Mousavi, Mohammad

46

Clean Cities: Electric Vehicle Community Readiness Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Events Events Printable Version Share this resource Send a link to Clean Cities: Electric Vehicle Community Readiness Workshop to someone by E-mail Share Clean Cities: Electric Vehicle Community Readiness Workshop on Facebook Tweet about Clean Cities: Electric Vehicle Community Readiness Workshop on Twitter Bookmark Clean Cities: Electric Vehicle Community Readiness Workshop on Google Bookmark Clean Cities: Electric Vehicle Community Readiness Workshop on Delicious Rank Clean Cities: Electric Vehicle Community Readiness Workshop on Digg Find More places to share Clean Cities: Electric Vehicle Community Readiness Workshop on AddThis.com... Conferences & Workshops Clean Cities 20th Anniversary Electric Vehicle Community Readiness Stakeholder Summit Waste-to-Wheels Plug-In Vehicle & Infrastructure

47

Zero Energy Ready Home Update Newsletter  

Broader source: Energy.gov [DOE]

Welcome to Zero Energy Ready Home Updateyour connection to news from the U.S. Department of Energys Zero Energy Ready Home program, which supports housing industry leaders with the tools...

48

Solar Ready: An Overview of Implementation Practices  

SciTech Connect (OSTI)

This report explores three mechanisms for encouraging solar ready building design and construction: solar ready legislation, certification programs for solar ready design and construction, and stakeholder education. These methods are not mutually exclusive, and all, if implemented well, could contribute to more solar ready construction. Solar ready itself does not reduce energy use or create clean energy. Nevertheless, solar ready building practices are needed to reach the full potential of solar deployment. Without forethought on incorporating solar into design, buildings may be incompatible with solar due to roof structure or excessive shading. In these cases, retrofitting the roof or removing shading elements is cost prohibitive. Furthermore, higher up-front costs due to structural adaptations and production losses caused by less than optimal roof orientation, roof equipment, or shading will lengthen payback periods, making solar more expensive. With millions of new buildings constructed each year in the United States, solar ready can remove installation barriers and increase the potential for widespread solar adoption. There are many approaches to promoting solar ready, including solar ready legislation, certification programs, and education of stakeholders. Federal, state, and local governments have the potential to implement programs that encourage solar ready and in turn reduce barriers to solar deployment. With the guidance in this document and the examples of jurisdictions and organizations already working to promote solar ready building practices, federal, state, and local governments can guide the market toward solar ready implementation.

Watson, A.; Guidice, L.; Lisell, L.; Doris, L.; Busche, S.

2012-01-01T23:59:59.000Z

49

Digital Forensic Readiness: Are We There Yet?  

E-Print Network [OSTI]

Digital Forensic Readiness: Are We There Yet? Antonis Mouhtaropoulos, Chang-Tsun Li Department.co.za Abstract--Digital Forensic Readiness is defined as the pre- incident plan that deals with an organization for a common forensic readiness standard. This article reviews a number of key initiatives in order to point

Li, Chang-Tsun

50

Automation i Distributionsnt; Distribution automation.  

E-Print Network [OSTI]

?? As a part of Gteborg Energis work towards a smarter electric grid, the company has chosen to investigate the possibilities of automation in their (more)

Mrd, Mathias

2012-01-01T23:59:59.000Z

51

Operational Readiness Team: OPERATIONAL READINESS REVIEW PLAN FOR THE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

oak ridge oak ridge 12 ...... Prepared by the Operational Readiness Team: OPERATIONAL READINESS REVIEW PLAN FOR THE RAD1 0 1 SOT0 PE THERMOELECTRIC GENERATOR MATERIALS PRODUCTION TASKS R. H. Cooper M. M. Martin C. R. Riggs R. L. Beatty E. K. Ohriner R. N. Escher OISTRIBUTIQM OF THIS DOCUMENT IS UNLIMITED DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency Thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately

52

Automated Demand Response and Commissioning  

SciTech Connect (OSTI)

This paper describes the results from the second season of research to develop and evaluate the performance of new Automated Demand Response (Auto-DR) hardware and software technology in large facilities. Demand Response (DR) is a set of activities to reduce or shift electricity use to improve the electric grid reliability and manage electricity costs. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. We refer to this as Auto-DR. The evaluation of the control and communications must be properly configured and pass through a set of test stages: Readiness, Approval, Price Client/Price Server Communication, Internet Gateway/Internet Relay Communication, Control of Equipment, and DR Shed Effectiveness. New commissioning tests are needed for such systems to improve connecting demand responsive building systems to the electric grid demand response systems.

Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Bourassa, Norman

2005-04-01T23:59:59.000Z

53

Solar Ready Buildings Planning Guide  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

78 78 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 Technical Report NREL/TP-7A2-46078 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson Prepared under Task No. PVC9.92DA NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any

54

Solar Ready Buildings Planning Guide  

Broader source: Energy.gov (indexed) [DOE]

6078 6078 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 Technical Report NREL/TP-7A2-46078 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson Prepared under Task No. PVC9.92DA NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any

55

Highway Electrification And Automation  

E-Print Network [OSTI]

Electrification and Automation Technologies - RegionalHighway Electrification and Automation Steven E. Shladovertechnology of highway automation, as well as its belief

Shladover, Steven E.

1992-01-01T23:59:59.000Z

56

Transportation System Readiness and Resiliency Assessment Framework: Readiness and Assess Resiliency of  

E-Print Network [OSTI]

Transportation System Readiness and Resiliency Assessment Framework: Readiness and Assess Resiliency of Transportation Systems (Infrastructure, Systems, Organization and Services) to Deter, Detect Flows Passenger Flows Supply Chain Efficiency Transportation: Energy Environment Safety Security Vehicle

57

Organizational Readiness in Specialty Mental Health Care  

E-Print Network [OSTI]

readiness for change (ORC) measure, and key stake- holders43 clinical staff completed the ORC, and 38 key stakeholdersdeviations (SDs) of the ORC scores are also illuminating in

Hamilton, Alison B.; Cohen, Amy N.; Young, Alexander S.

2010-01-01T23:59:59.000Z

58

ORISE: Asset Readiness Management System (ARMS)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Asset Readiness Management System (ARMS) Database tracks emergency response exercises and equipment to help DOE asses emergency preparedness Developed by the Oak Ridge Institute...

59

Hydrogen Infrastructure Market Readiness Workshop Agenda | Department...  

Broader source: Energy.gov (indexed) [DOE]

Market Readiness Workshop, hosted by the U.S. Department of Energy's National Renewable Energy Laboratory, February 16-17, 2011, in Washington, DC. wkshpmarketreadinessagenda....

60

Hydrogen Infrastructure Market Readiness: Opportunities and Potential...  

Broader source: Energy.gov (indexed) [DOE]

Opportunities and Potential for Near-term Cost Reductions. Proceedings of the Hydrogen Infrastructure Market Readiness Workshop and Summary of Feedback Provided through the...

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

DOE Zero Energy Ready Home Verification | Department of Energy  

Energy Savers [EERE]

Verification DOE Zero Energy Ready Home Verification DOE Zero Energy Ready Homes Verification, a publication of the U.S. Department of Energy Zero Energy Ready Homes program. DOE...

62

Roundtable on Sustainable Biofuels Certification Readiness Study  

E-Print Network [OSTI]

Roundtable on Sustainable Biofuels Certification Readiness Study: Hawai`i Biofuel Projects Prepared 12.1 Deliverable Bioenergy Analyses Prepared by Hawai`i Biofuel Foundation And NCSI Americas Inc agency thereof. #12;1 RSB Certification Readiness Study: Hawaii Biofuel Projects Prepared For Hawaii

63

Project Get Ready | Open Energy Information  

Open Energy Info (EERE)

Get Ready Get Ready Jump to: navigation, search Name Project Get Ready Agency/Company /Organization Rocky Mountain Institute Sector Energy Focus Area Transportation Topics Implementation Resource Type Dataset Website http://projectgetready.com/ Equivalent URI http://cleanenergysolutions.org/content/project-get-ready-pgr-total-cost-vehicle-ownership-calculator-0, http://cleanenergysolutions.org/content/project-get-ready-pgr-total-cost-vehicle-ownership-calculator References [1] Abstract The calculator allows individuals to consider the purchase cost (including financing) and the fuel cost of electric vehicles compared to conventional vehicles over a lifetime of 15 years. Consumers should also consider driving habits, maintenance costs, insurance, resale value, and potential battery and charging infrastructure costs.

64

Hawaii Gets 'EV Ready' | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Gets 'EV Ready' Gets 'EV Ready' Hawaii Gets 'EV Ready' January 31, 2012 - 11:09am Addthis Last July, Governor Neil Abercrombie unveiled the first public charging station installed in the state capitol’s underground parking garage with the "Hawaii EV Ready" program. In 2011, rebates were approved for 237 electric vehicles and 168 chargers. | Photo courtesy of the Office of the Governor. Last July, Governor Neil Abercrombie unveiled the first public charging station installed in the state capitol's underground parking garage with the "Hawaii EV Ready" program. In 2011, rebates were approved for 237 electric vehicles and 168 chargers. | Photo courtesy of the Office of the Governor. Julie McAlpin Communications Liaison, State Energy Program By 2030, the Hawaii Clean Energy Initiative will:

65

Hawaii Gets 'EV Ready' | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Hawaii Gets 'EV Ready' Hawaii Gets 'EV Ready' Hawaii Gets 'EV Ready' January 31, 2012 - 11:09am Addthis Last July, Governor Neil Abercrombie unveiled the first public charging station installed in the state capitol’s underground parking garage with the "Hawaii EV Ready" program. In 2011, rebates were approved for 237 electric vehicles and 168 chargers. | Photo courtesy of the Office of the Governor. Last July, Governor Neil Abercrombie unveiled the first public charging station installed in the state capitol's underground parking garage with the "Hawaii EV Ready" program. In 2011, rebates were approved for 237 electric vehicles and 168 chargers. | Photo courtesy of the Office of the Governor. Julie McAlpin Communications Liaison, State Energy Program

66

Technology Readiness Assessments | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Waste Management » Tank Waste and Waste Processing » Waste Management » Tank Waste and Waste Processing » Technology Readiness Assessments Technology Readiness Assessments Documents Available for Download January 1, 2012 Compilation of TRA Summaries A compilation of all TRA Summaries November 1, 2011 Small Column Ion Exchange at Savannah River Site Technology Readiness Assessment Report February 7, 2011 Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 2 (CDP) Full Document and Summary Versions are available for download February 7, 2011 Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP) Full Document and Summary Versions are available for download November 1, 2009 K Basins Sludge Treatment Project Phase 1 Full Document and Summary Versions are available for download

67

Robertsons Ready Mix | Open Energy Information  

Open Energy Info (EERE)

Robertsons Ready Mix Robertsons Ready Mix Jump to: navigation, search Name Robertsons Ready Mix Facility Robertsons Ready Mix Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Foundation Windpower Developer Foundation Windpower Energy Purchaser Robertsons Ready Mix Location Cabazon CA Coordinates 33.915842°, -116.81325° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.915842,"lon":-116.81325,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

68

Planning and Conducting Readiness Reviews  

Broader source: Energy.gov (indexed) [DOE]

3006-2010 3006-2010 ________________________ Superseding DOE-STD-3006-2000 June 2000 DOE STANDARD PLANNING AND CONDUCTING READINESS REVIEWS U.S. Department of Energy AREA OPER Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. TS This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. DOE-STD-3006-YR i CONTENTS FOREWORD................................................................................................................................. 1

69

Lightning Arrestor Connectors Production Readiness  

SciTech Connect (OSTI)

The Lightning Arrestor Connector (LAC), part M, presented opportunities to improve the processes used to fabricate LACs. The A## LACs were the first production LACs produced at the KCP, after the product was transferred from Pinnellas. The new LAC relied on the lessons learned from the A## LACs; however, additional improvements were needed to meet the required budget, yield, and schedule requirements. Improvement projects completed since 2001 include Hermetic Connector Sealing Improvement, Contact Assembly molding Improvement, development of a second vendor for LAC shells, general process improvement, tooling improvement, reduction of the LAC production cycle time, and documention of the LAC granule fabrication process. This report summarizes the accomplishments achieved in improving the LAC Production Readiness.

Marten, Steve; Linder, Kim; Emmons, Jim; Gomez, Antonio; Hasam, Dawud; Maurer, Michelle

2008-10-20T23:59:59.000Z

70

Advancing Technology Readiness: Wave Energy Testing and Demonstration...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Advancing Technology Readiness: Wave Energy Testing and Demonstration Advancing Technology Readiness: Wave Energy Testing and Demonstration March 6, 2014 - 1:23pm Addthis Northwest...

71

DOE Zero Energy Ready Home Case Study: John Hubert Associates...  

Energy Savers [EERE]

Homes, Double Oak, TX DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland, MI DOE Zero Energy Ready Home Case Study, Preferred Builders, Old Greenwich, CT, Custom...

72

Quality Management Systems for Zero Energy Ready Home Webinar...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Quality Management Systems for Zero Energy Ready Home Webinar (Text Version) Quality Management Systems for Zero Energy Ready Home Webinar (Text Version) Below is the text version...

73

Energy -- and Water -- Efficiency in the DOE Zero Energy Ready...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Energy -- and Water -- Efficiency in the DOE Zero Energy Ready Home Program Webinar (Text Version) Energy -- and Water -- Efficiency in the DOE Zero Energy Ready Home Program...

74

EV Community Readiness projects: Center for Transportation and...  

Broader source: Energy.gov (indexed) [DOE]

EV Community Readiness projects: Center for Transportation and the Environment (GA, AL, SC); Centralina Council of Governments (NC) EV Community Readiness projects: Center for...

75

DOE Zero Energy Ready Home: Healthy Efficient Homes - Spirit...  

Energy Savers [EERE]

Old Greenwich, CT, Custom DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland, MI DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown, RI...

76

DOE Zero Energy Ready Home Case Study: Sterling Brook Custom...  

Energy Savers [EERE]

TX More Documents & Publications DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown, RI DOE Zero Energy Ready Home Case Study: Mandalay Homes, Prescott...

77

DOE Zero Energy Ready Home Case Study: Caldwell and Johnson,...  

Broader source: Energy.gov (indexed) [DOE]

Caldwell and Johnson, Charlestown, RI DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown, RI Case study of a DOE Zero Energy Ready affordable home in...

78

DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland...  

Office of Environmental Management (EM)

Old Greenwich, CT, Custom DOE Zero Energy Ready Home: Healthy Efficient Homes - Spirit Lake, Iowa DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown, RI...

79

Readiness Review Training - Team Leader | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Team Leader November 10, 2010 Readiness Review Team Leader Training at the Idaho National Laboratory Course provides tools and tips to be an effective readiness review team leader....

80

Oregon: Advancing Technology Readiness: Wave Energy Testing and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Oregon: Advancing Technology Readiness: Wave Energy Testing and Demonstration Oregon: Advancing Technology Readiness: Wave Energy Testing and Demonstration March 6, 2014 - 1:23pm...

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Preliminary Technology Readiness Assessment (TRA) for the Calcine...  

Broader source: Energy.gov (indexed) [DOE]

Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP) Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project...

82

EV Community Readiness projects: New York City and Lower Hudson...  

Broader source: Energy.gov (indexed) [DOE]

ACCOMPLISHMENTS NYCLHVCC: Clean Cities 2011 EV Community Readiness DUANE Reade's Smith EV at Plug-In Day in Times Square Clean Cities 2011 Community Readiness & Planning...

83

CX-003319: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

19: Categorical Exclusion Determination 19: Categorical Exclusion Determination CX-003319: Categorical Exclusion Determination Recovery Act - National Aeronautics and Space Administration Solar Electric Propulsion Technology Application Readiness (NSTAR) Automated Meter Reading (AMR) -Based Dynamic Pricing CX(s) Applied: A1, A9, A11, B2.2, B5.1 Date: 07/30/2010 Location(s): Newton, Massachusetts Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory National Aeronautics and Space Administration Solar Electric Propulsion Technology Application Readiness (NSTAR) will demonstrate the viability of leveraging existing automated meter reading (AMR) deployments to provide much of the functionality of advanced metering infrastructure (AMI), but at a lower cost. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

84

Shovel Ready Energy Project Grants (Florida)  

Broader source: Energy.gov [DOE]

This program leverages Floridas state energy grant initiatives to identify shovel-ready projects that can be expeditiously implemented through available SEP funding. The goal is to provide...

85

Guam- Solar-Ready Residential Building Requirement  

Broader source: Energy.gov [DOE]

Note: Guam is in the process of adopting a [www.guamenergy.com/outreach-education/guam-tropical-energy-code/ tropical energy code]. As a result, the solar ready provisions described below may...

86

Hydrogen Infrastructure Market Readiness Workshop: Preliminary Results  

Broader source: Energy.gov [DOE]

Preliminary results from the Hydrogen Infrastructure Market Readiness Workshop held February 16-17, 2011. This presentation was disseminated to workshop attendees to convey the aggregate and "raw" feedback collected during the workshop.

87

NanoReady Ltd | Open Energy Information  

Open Energy Info (EERE)

NanoReady Ltd NanoReady Ltd Jump to: navigation, search Name NanoReady Ltd Place Caesarea, Israel Zip 38900 Sector Solar Product String representation "NanoReady devel ... nd solar cells." is too long. Coordinates 32.483311°, 34.89521° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.483311,"lon":34.89521,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

88

Connecting Ready-to-Work Americans with Ready-to-Be-Filled Jobs...  

Energy Savers [EERE]

and Louisiana Economic Development are ready to provide technical assistance and capacity building training to diverse businesses. My office and the Department of Commerce will...

89

Automation Performance Index.  

E-Print Network [OSTI]

??Automation is intended to improve overall building performance. Building Automation Systems (BAS) are attractive and popular due to their promise of increased operational effectiveness. BAS (more)

Makarechi, Shariar

2006-01-01T23:59:59.000Z

90

Views on Automation  

Science Journals Connector (OSTI)

Views on Automation ... Industrial managements, he feels, must allay workers' fears by showing how they can take pride in the greater accomplishment of automated plants. ...

1957-07-29T23:59:59.000Z

91

Ready. Aim. Fire. | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Ready. Aim. Fire. Ready. Aim. Fire. Ready. Aim. Fire. March 28, 2011 - 4:27pm Addthis John Lippert I wrote in a previous blog posting about using digital electric meters to locate "leaking" electricity-often referred to as phantom loads and vampire loads-and high electrical power consumption. In another posting I described what I'm doing to reach out in my community to get my neighbors to use these meters to locate wasteful electricity usage in their homes. Now my community will have another tool in its arsenal to combat energy waste: a thermal leak detector. Whereas the digital electric meter helps locate electricity leaks, the thermal leak detector helps locate-well, you guessed it-thermal (heat) leaks. Heating and cooling your home account for close to half of the energy use

92

An assessment of the value of retail ready packaging  

E-Print Network [OSTI]

Use of retail-ready packaging reduces the costs of replenishing store shelves by eliminating the labor of removing packaging materials and stocking individual items on shelves. While reducing costs for retailers, retail-ready ...

Jackson, Kathleen Anne

2008-01-01T23:59:59.000Z

93

Building America Top Innovations 2013 Profile - Zero Energy-Ready...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Top Innovations 2013 Profile - Zero Energy-Ready Single-Family Homes Building America Top Innovations 2013 Profile - Zero Energy-Ready Single-Family Homes Many Building America...

94

DOE Zero Energy Ready Home Case Study: Mandalay Homes, Prescott...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Study: Mandalay Homes, Prescott Valley, AZ DOE Zero Energy Ready Home Case Study: Mandalay Homes, Prescott Valley, AZ Case study of a DOE Zero Energy Ready home in northern AZ that...

95

ZERH Webinar: Sales and Value Recognition of Zero Energy Ready...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ZERH Webinar: Sales and Value Recognition of Zero Energy Ready Homes ZERH Webinar: Sales and Value Recognition of Zero Energy Ready Homes December 18, 2014 12:00PM to 1:15PM EST...

96

DOE Zero Energy Ready Home Case Study, Mandalay Homes, Phoenix...  

Energy Savers [EERE]

Mandalay Homes, Phoenix, AZ, Affordable DOE Zero Energy Ready Home Case Study, Mandalay Homes, Phoenix, AZ, Affordable Case study of a DOE Zero Energy Ready Home in Phoenix, AZ...

97

DOE Zero Energy Ready Home Case Study, Garbett Homes, Herriman...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Garbett Homes, Herriman, UT, Production Home DOE Zero Energy Ready Home Case Study, Garbett Homes, Herriman, UT, Production Home Case study of a DOE Zero Energy Ready Home in...

98

DOE Zero Energy Ready Home Case Study: Amerisips Homes, Charleston...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Amerisips Homes, Charleston, SC DOE Zero Energy Ready Home Case Study: Amerisips Homes, Charleston, SC Case study of a DOE Zero Energy Ready home on Johns Island in Charleston, SC,...

99

DOE Zero Energy Ready Home Case Study: Sterling Brook Custom...  

Energy Savers [EERE]

Sterling Brook Custom Homes, Double Oak, TX DOE Zero Energy Ready Home Case Study: Sterling Brook Custom Homes, Double Oak, TX Case study of a DOE Zero Energy Ready home in Double...

100

DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland...  

Energy Savers [EERE]

Cobblestone Homes, Midland, MI DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland, MI Case study of a DOE Zero Energy Ready home in Midland, MI, that scored HERS 49...

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Perceived Readiness for Practice of Senior Baccalaureate Nursing Students  

E-Print Network [OSTI]

experiences. This mixed method study examined the psychometric properties of a readiness for practice tool, and explored the effects of a clinical internship experience on the perception of readiness for practice of 483 senior baccalaureate nursing students...

Reagor, Janet

2010-04-20T23:59:59.000Z

102

ENERGY STAR Webinar: Zero Energy Ready Home Program | Department...  

Broader source: Energy.gov (indexed) [DOE]

home is as good as ENERGY STAR, the modest added "lift" to bring a home up to DOE's Zero Energy Ready specs unleashes a wave of powerful value messages. DOE Zero Energy Ready...

103

DOE Zero Energy Ready Home Case Study: Brookside Development...  

Energy Savers [EERE]

Preferred Builders, Old Greenwich, CT, Custom DOE Zero Energy Ready Home Case Study: AquaZephyr, Ithaca, NY DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland, MI...

104

New DOE Report Investigates Port Readiness for Offshore Wind...  

Energy Savers [EERE]

New DOE Report Investigates Port Readiness for Offshore Wind New DOE Report Investigates Port Readiness for Offshore Wind October 1, 2013 - 1:22pm Addthis This is an excerpt from...

105

DOE Zero Energy Ready Home Case Study: Greenhill Contracting...  

Energy Savers [EERE]

Study: Greenhill Contracting, New Paltz, NY DOE Zero Energy Ready Home Case Study: Greenhill Contracting, New Paltz, NY Case study of a DOE Zero Energy Ready home in New Paltz, NY,...

106

Zero Energy Ready Home Events | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Zero Energy Ready Home Events Zero Energy Ready Home Events February 2015 < prev next > Sun Mon Tue Wed Thu Fri Sat 1 2 3 4 5 6 7 ZERH Webinar: High-Performance Home Sales Training...

107

DOE Zero Energy Ready Home Case Study, Caldwell and Johnson,...  

Office of Environmental Management (EM)

Study, Caldwell and Johnson, Exeter, RI, Custom Home DOE Zero Energy Ready Home Case Study, Caldwell and Johnson, Exeter, RI, Custom Home Case study of a DOE Zero Energy Ready Home...

108

DOE Zero Energy Ready Home National Program Requirements (Rev. 04)  

Broader source: Energy.gov [DOE]

U.S. Department of Energy Zero Energy Ready Home National Program Requirements (Rev. 04), April 21, 2014.

109

Is Vietnam Ready for Nuclear Power?  

Science Journals Connector (OSTI)

Is Vietnam Ready for Nuclear Power? ... Currently the worlds largest nuclear power market exists in emerging economies and developing countries as those countries are in great need of relatively cheap energy to drive its economic growth. ... But nuclear power, neither cheap nor safe, is putting those countries in a dilemma. ...

Changjian Wang; Qiang Wang; Fei Wang

2012-04-27T23:59:59.000Z

110

Roundtable on Sustainable Biofuels Certification Readiness Study  

E-Print Network [OSTI]

Roundtable on Sustainable Biofuels Certification Readiness Study: Hawai`i Biofuel Projects Prepared 12.1 Deliverable (item 2) Bioenergy Analyses Prepared by Hawai`i Biofuel Foundation And NCSI Americas: Hawaii Biofuel Projects Prepared For Hawaii Natural Energy Institute School of Ocean Earth Sciences

111

Shale oil processes ready for commercialization  

Science Journals Connector (OSTI)

Shale oil processes ready for commercialization ... However, Lurgi has been in the shale processing business by itself since the 1930s, and hopes to capitalize on this experience. ... Lurgi developed the Lurgi-Ruhrgas (LR) process in concert with Ruhrgas with an eye on the U.S. shale oil markets of the future. ...

1982-04-12T23:59:59.000Z

112

Global e-Readiness - For What? Readiness for e-Banking (JITD)  

E-Print Network [OSTI]

With the rapid diffusion of the Internet worldwide, there has been considerable interest in the e-potentials of developing countries giving rise to a 1st generation of e-Readiness studies. Moreover, ...

Maugis, V.

2004-12-10T23:59:59.000Z

113

Home Automation System; Automation i hemmet.  

E-Print Network [OSTI]

?? This project revolves around creating a home automation system prototype with the main focus being the ability to lock/unlock a door through the internet. (more)

Ruwaida,, Bassam

2013-01-01T23:59:59.000Z

114

Automation of organic elemental analysis  

Science Journals Connector (OSTI)

Automation of organic elemental analysis ... Describes the development and design of an apparatus for automated organic elemental analysis. ...

Velmer B. Fish

1969-01-01T23:59:59.000Z

115

Automation in biological crystallization  

Science Journals Connector (OSTI)

Automation is the response to overcoming the crystallization bottleneck in biological crystallography. This review provides a summary of the current methods and technologies applied in automated platforms for the setup of initial and follow-up crystallization experiments.

Shaw Stewart, P.

2014-05-28T23:59:59.000Z

116

Digital Control for Automation  

Science Journals Connector (OSTI)

GREATER YIELDS OF BETTER QUALITY PRODUCTS at reduced costs: That's one way to look at automations goal. And among instruments for automation are data reduction systems (others: continuous process analyzers, computer elements, and control mechanisms). ...

1956-04-02T23:59:59.000Z

117

AUTOMATION: Hints from OCAW  

Science Journals Connector (OSTI)

AUTOMATION: Hints from OCAW ... Labor and management need more, not less, collective bargaining in automated industries, he told a Houston, Tex., meeting of the Petro Group of the South Texas Section of the American Institute of Chemical Engineers. ...

1969-06-30T23:59:59.000Z

118

Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Ethiopia UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1]

119

UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) | Open  

Open Energy Info (EERE)

UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Name UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

120

Facilitating Implementation and Readiness for Mitigation (FIRM) | Open  

Open Energy Info (EERE)

Facilitating Implementation and Readiness for Mitigation (FIRM) Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Name UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Costa Rica, Ethiopia, Ghana, Indonesia, Mexico, Morocco, Senegal, South Africa, Vietnam UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1]

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM)  

Open Energy Info (EERE)

Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM) Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Costa Rica UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1]

122

South Africa-Facilitating Implementation and Readiness for Mitigation  

Open Energy Info (EERE)

South Africa-Facilitating Implementation and Readiness for Mitigation South Africa-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: South Africa-Facilitating Implementation and Readiness for Mitigation (FIRM) Name South Africa-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country South Africa UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1]

123

Theorie des langages Automates finis  

E-Print Network [OSTI]

Th´eorie des langages Automates finis Elise Bonzon http://web.mi.parisdescartes.fr/ bonzon/ elise.bonzon@parisdescartes.fr 1 / 51 Th´eorie des langages #12;Automates finis Automates finis Introduction Formalisation Repr´erations sur les automates Automates finis et langages 2 / 51 Th´eorie des langages #12;Automates finis

Bonzon, Elise

124

Multiplex automated genome engineering  

DOE Patents [OSTI]

The present invention relates to automated methods of introducing multiple nucleic acid sequences into one or more target cells.

Church, George M; Wang, Harris H; Isaacs, Farren J

2013-10-29T23:59:59.000Z

125

Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Events Events Printable Version Share this resource Send a link to Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop to someone by E-mail Share Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Facebook Tweet about Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Twitter Bookmark Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Google Bookmark Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Delicious Rank Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Digg Find More places to share Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on AddThis.com... Conferences & Workshops

126

Congress Likes Automation  

Science Journals Connector (OSTI)

Congress Likes Automation ... Industry is generally aware of its responsibilities to worker replaced by automation, Congressional group concludes after broad study ... No NEW LEGISLATION or legislative changes are required to keep pace with the impact of automation on the national economy, concludes Rep. Wright Patman (D.-Tex.). ...

1955-11-07T23:59:59.000Z

127

Automated Demand Response Opportunities in Wastewater Treatment Facilities  

SciTech Connect (OSTI)

Wastewater treatment is an energy intensive process which, together with water treatment, comprises about three percent of U.S. annual energy use. Yet, since wastewater treatment facilities are often peripheral to major electricity-using industries, they are frequently an overlooked area for automated demand response opportunities. Demand response is a set of actions taken to reduce electric loads when contingencies, such as emergencies or congestion, occur that threaten supply-demand balance, and/or market conditions occur that raise electric supply costs. Demand response programs are designed to improve the reliability of the electric grid and to lower the use of electricity during peak times to reduce the total system costs. Open automated demand response is a set of continuous, open communication signals and systems provided over the Internet to allow facilities to automate their demand response activities without the need for manual actions. Automated demand response strategies can be implemented as an enhanced use of upgraded equipment and facility control strategies installed as energy efficiency measures. Conversely, installation of controls to support automated demand response may result in improved energy efficiency through real-time access to operational data. This paper argues that the implementation of energy efficiency opportunities in wastewater treatment facilities creates a base for achieving successful demand reductions. This paper characterizes energy use and the state of demand response readiness in wastewater treatment facilities and outlines automated demand response opportunities.

Thompson, Lisa; Song, Katherine; Lekov, Alex; McKane, Aimee

2008-11-19T23:59:59.000Z

128

Vehicle Technologies Office: Community and Fleet Readiness  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Community and Fleet Readiness Community and Fleet Readiness As researchers work to lower the costs and increase the convenience of plug-in electric vehicles (PEVs), it's also necessary to make similar strides on the local level. State and local incentives, such as tax credits or access to HOV lanes, can encourage consumers and vehicle fleets to purchase PEVs. In contrast, difficult permitting procedures for chargers or a lack of signage can discourage adoption. To help communities prepare themselves for plug-in and other alternative fuel vehicles, the Office works with nearly 100 Clean Cities coalitions across the country. Clean Cities offers a wide variety of resources to cities and regions that want to encourage citizens and businesses to drive PEVs. They also offer resources to both public and private fleets that wish to adopt these vehicles.

129

Hydrogen Infrastructure Market Readiness Workshop: Preliminary Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hydrogen Infrastructure Market Readiness Hydrogen Infrastructure Market Readiness Workshop: Preliminary Results Marc Melaina, PhD Hydrogen Technologies and Systems Center, NREL Distributed electronically to workshop attendees for review March 24, 2011 Goal of this presentation * This presentation is being disseminated to workshop attendees to convey the aggregate and "raw" feedback collected during the workshop * This feedback will be compiled in a final report * We would like to accomplish two things with these slides: 1. Share the preliminary results with participants 2. Get your feedback now on any corrections or omissions * We are still open to receiving additional feedback on the workshop topic, but will report it as having been received outside of the workshop if it is included in the final report

130

NGNP Infrastructure Readiness Assessment: Consolidation Report  

SciTech Connect (OSTI)

The Next Generation Nuclear Plant (NGNP) project supports the development, demonstration, and deployment of high temperature gas-cooled reactors (HTGRs). The NGNP project is being reviewed by the Nuclear Energy Advisory Council (NEAC) to provide input to the DOE, who will make a recommendation to the Secretary of Energy, whether or not to continue with Phase 2 of the NGNP project. The NEAC review will be based on, in part, the infrastructure readiness assessment, which is an assessment of industry's current ability to provide specified components for the FOAK NGNP, meet quality assurance requirements, transport components, have the necessary workforce in place, and have the necessary construction capabilities. AREVA and Westinghouse were contracted to perform independent assessments of industry's capabilities because of their experience with nuclear supply chains, which is a result of their experiences with the EPR and AP-1000 reactors. Both vendors produced infrastructure readiness assessment reports that identified key components and categorized these components into three groups based on their ability to be deployed in the FOAK plant. The NGNP project has several programs that are developing key components and capabilities. For these components, the NGNP project have provided input to properly assess the infrastructure readiness for these components.

Brian K Castle

2011-02-01T23:59:59.000Z

131

Joint Genome Institute's Automation Approach and History  

E-Print Network [OSTI]

Joint Genome Institutes Automation Approach and Historythroughput environment; automation does not necessarilyissues Islands of Automation modular instruments with

Roberts, Simon

2006-01-01T23:59:59.000Z

132

Process Development Automation:? An Evolutionary Approach  

Science Journals Connector (OSTI)

Process Development Automation:? An Evolutionary Approach ... In contrast, standard laboratory equipment already contains some automated capabilities but is normally unused in our automation strategies. ... What Can Be Automated? ...

Mike Pollard

2001-04-27T23:59:59.000Z

133

An Automation System for Optimizing a Supply Chain Network Design under the Influence of Demand Uncertainty  

E-Print Network [OSTI]

Automation . . . . . . . . . . . . . . . . . . . . . . iii 3Automation . . . . . . . . . . . . . . . . . . . . . . 5Dashboard/Cockpit Automation . . . . . . . . . . . . .

Polany, Rany

2012-01-01T23:59:59.000Z

134

Certified Sites (Ready! Set! Build!) (Wisconsin) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Certified Sites (Ready! Set! Build!) (Wisconsin) Certified Sites (Ready! Set! Build!) (Wisconsin) Certified Sites (Ready! Set! Build!) (Wisconsin) < Back Eligibility Agricultural Developer General Public/Consumer Institutional Low-Income Residential Nonprofit Residential Rural Electric Cooperative Schools State/Provincial Govt Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Wisconsin Program Type Training/Technical Assistance Siting and Permitting Provider Wisconsin Economic Development Corporation WEDC has created, in partnership with Deloitte Consulting (Site Selector Consultant) and community partners, the Ready! Set! Build! Program, which provides consistent standards for industrial site certification in

135

The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

for Market Readiness (PMR) for Market Readiness (PMR) Jump to: navigation, search Logo: The World Bank Partnership for Market Readiness (PMR) - Brazil Name The World Bank Partnership for Market Readiness (PMR) - Brazil Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs Website http://wbcarbonfinance.org/Rou

136

Jasper Johns in der Nachfolge des Ready-mades.  

E-Print Network [OSTI]

??Die Arbeit untersucht, wie die Einfhrung des Ready-mades in die Kunstwelt die Arbeitsweise von Knstlern sowie die Produktion und Wahrnehmung von Kunstwerken beeinflusst hat. Dies (more)

Mayer, Lynette Mildred

2013-01-01T23:59:59.000Z

137

Accelerating the Electrification of U.S. Drive Trains: Ready...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

More Documents & Publications Accelerating the Electrification of U.S. Drive Trains: Ready and Affordable Technology Solutions for Domestically Manufactured Advanced...

138

Readiness Review Training - Development of Criteria And Review...  

Broader source: Energy.gov (indexed) [DOE]

Documents November 8-9, 2010 Readiness Review Training - Development of Criteria And Review Approach Documents Topics include: Implementation Plan IP Approval Content of IP IP...

139

Richmond Electric Vehicle Initiative Electric Vehicle Readiness Plan  

Broader source: Energy.gov [DOE]

The REVi plan addresses the electric vehicle market in Richmond and then addresses a regional plan, policies, and analysis of the the communities readiness.

140

DOE Zero Energy Ready Home Case Study: Southern Homes, Russellville...  

Energy Savers [EERE]

Southern Homes, Russellville, AL DOE Zero Energy Ready Home Case Study: Southern Homes, Russellville, AL Case study of the first manufactured home built to the DOE Zero Energy...

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Zero Energy Ready Home - 2014 BTO Peer Review | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Zero Energy Ready program, formerly known as the DOE Challenge Home program, is to transform the housing market to high-performance homes. These homes are extremely energy...

142

DOE Zero Ready Home Case Study: Cobblestone Homes, 2014 Model...  

Energy Savers [EERE]

designed in to give you superior construction, durability, and comfort; healthy indoor air; high-performance HVAC, lighting, and appliances; and solar-ready components for low...

143

EV Community Readiness projects: American Lung Association of...  

Broader source: Energy.gov (indexed) [DOE]

and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting ti027kelly2013o.pdf More Documents & Publications EV Community Readiness projects: Center for...

144

Communities Plug In To Electric Vehicle Readiness | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

electric vehicle readiness projects from throughout the country. | Photo by Ken Kelly, National Renewable Energy Laboratory EV Everywhere: 10 Ways Communities Can Pave the...

145

Colorado Community Readiness Efforts for PEVs Support State Policy...  

Energy Savers [EERE]

electric vehicle readiness projects from throughout the country. | Photo by Ken Kelly, National Renewable Energy Laboratory EV Everywhere: 10 Ways Communities Can Pave the...

146

EV Community Readiness projects: Clean Energy Coalition (MI)...  

Broader source: Energy.gov (indexed) [DOE]

Clean Energy Coalition (MI); Clean Fuels Ohio EV Community Readiness projects: Clean Energy Coalition (MI); Clean Fuels Ohio 2013 DOE Hydrogen and Fuel Cells Program and Vehicle...

147

EV Community Readiness projects: Delaware Valley Regional Planning...  

Broader source: Energy.gov (indexed) [DOE]

Delaware Valley Regional Planning Commission (PA); Metropolitan Energy Information Center, Inc. (KS, MO) EV Community Readiness projects: Delaware Valley Regional Planning...

148

DOE Zero Energy Ready Home Case Study: Southern Energy Homes...  

Office of Environmental Management (EM)

Southern Energy Homes, Russellville, AL DOE Zero Energy Ready Home Case Study: Southern Energy Homes, Russellville, AL Case study of the first manufactured home built to the DOE...

149

DOE Zero Energy Ready Home Webinar: Building Energy Optimization...  

Broader source: Energy.gov (indexed) [DOE]

Building Energy Optimization (BEopt) Software DOE Zero Energy Ready Home Webinar: Building Energy Optimization (BEopt) Software This webinar was presented on May 15, 2014 and gives...

150

Technology Readiness Assessment (TRA)/Technology Maturation Plan...  

Broader source: Energy.gov (indexed) [DOE]

(TRA)Technology Maturation Plan (TMP) Process Guide Technology Readiness Assessment (TRA)Technology Maturation Plan (TMP) Process Guide This document is a guide for those...

151

Preliminary Technology Readiness Assessment (TRA) for the Calcine...  

Office of Environmental Management (EM)

2 (CDP) Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 2 (CDP) Full Document and Summary Versions are available for download...

152

Guidelines for Participating in the DOE Zero Energy Ready Home...  

Broader source: Energy.gov (indexed) [DOE]

builders for their leadership in increasing energy efficiency, improving indoor air quality, and making homes zero energy ready. The program builds upon the comprehensive...

153

Building America Zero Energy Ready Home Case Study: Imery Group...  

Broader source: Energy.gov (indexed) [DOE]

Imery Group, Proud Green Home, Serenbe GA Building America Zero Energy Ready Home Case Study: Imery Group, Proud Green Home, Serenbe GA Case study describing the first...

154

EV Community Readiness projects: Clean Energy Coalition (MI...  

Broader source: Energy.gov (indexed) [DOE]

link the Michigan PEV Community Readiness Plan to relevant websites and other appropriate media outlets; incorporate the Plan into the PEV Taskforce website. Clean Cities Recovery...

155

DOE Zero Energy Ready Home: Better Business for Builders Webinar...  

Broader source: Energy.gov (indexed) [DOE]

Better Business for Builders Webinar Transcript DOE Zero Energy Ready Home: Better Business for Builders Webinar Transcript Below is the text version of the webinar, DOE Zero...

156

South Africa-Facilitating Implementation and Readiness for Mitigation...  

Open Energy Info (EERE)

and Readiness for Mitigation (FIRM)" Retrieved from "http:en.openei.orgwindex.php?titleSouthAfrica-FacilitatingImplementationandReadinessforMitigation(FIRM)&oldid70000...

157

Readiness Issues for Emergency Response Instrumentation  

SciTech Connect (OSTI)

Issues in maintaining readiness of instruments for deployment and use in emergency response situation often differ from those in maintaining instruments for normal operations. Confunding circumstances include use of non-availability of check sources, ensuring instruments are always in calibration and operable, possible use of instruments in different climates, packaging of instrumentation for deployment, transport of instrumentation and check sources, and ensuring users are familiar with instruments. Methods and procedures for addressing these issues are presented. Instrumentation used for survey, in situ measurements, electronic dosimetry, and air conditioning are discussed.

C.A. Riland; D.R. Bowman; R.J. Tighe

1999-03-01T23:59:59.000Z

158

CIMplementation: Evaluating Manufacturing Automation  

E-Print Network [OSTI]

in the manufacturing organization if CIMplementation~* is to succeed. 1.0 INTRODUCTION There is much discussion today about Com puter Integrated Manufacturing (CIM). Automation tools like Computer Aided Design (CAD) systems, robots, automated material handling...~ Pressing the frontier of technology in one's own manufactur ing facility will not be without its pitfalls. Second, while automation engineers may be able to piece together the technological pieces of a CIM system, they cannot and do not evaluate...

Krakauer, J.

159

IPv6 Home Automation.  

E-Print Network [OSTI]

?? Home automation is the systematic controlling and monitoring of everyday home devices such as lighting, heating, window blinds and appliances (both white goods and (more)

Hdn, Thor

2009-01-01T23:59:59.000Z

160

Home Automation Using Elvin.  

E-Print Network [OSTI]

?? Home automation systems of today tend to be external solutions to an existing product that enable rather complex and expensive communications equipment to be (more)

Malm, Anders

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Vehicle highway automation.  

E-Print Network [OSTI]

??Vehicle Highway Automation has been studied for several years but a practical system has not been possible because of technology limitations. New advances in sensing (more)

Challa, Dinesh Kumar

2009-01-01T23:59:59.000Z

162

Laboratory automation-A case history  

Science Journals Connector (OSTI)

Laboratory automation-A case history ... This article describes an automated Raman spectrometer. ...

Bernard J. Bulkin; Edward H. Cole; Arthur Noguerola

1974-01-01T23:59:59.000Z

163

Automated Demand Response and Commissioning  

E-Print Network [OSTI]

Fully-Automated Demand Response Test in Large Facilities14in DR systems. Demand Response using HVAC in Commercialof Fully Automated Demand Response in Large Facilities

Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Bourassa, Norman

2005-01-01T23:59:59.000Z

164

Autonomic Product Development Process Automation.  

E-Print Network [OSTI]

??Market globalization and mass customization requirements are forcing companies towards automation of their product development processes. Many task-specific software solutions provide localized automation. Coordinating these (more)

Daley, John E.

2007-01-01T23:59:59.000Z

165

Automation Creates New Managers  

Science Journals Connector (OSTI)

AUTOMATION will bring about new and broader patterns in the use of labor and creation of a large group of managers of a new type, says E. W. Engstrom, senior executive vice president of the Radio Corporation of America. With automation, there will no ...

1955-12-12T23:59:59.000Z

166

SCS-2005-18 Roundup Ready Flex Cotton System  

E-Print Network [OSTI]

SCS-2005-18 6-05 Roundup Ready Flex Cotton System Robert Lemon, Ph.D., Professor and Extension Agronomist - Cotton Randy Boman, Ph.D., Associate Professor and Extension Agronomist - Cotton Todd Baughman Specialist Peter Dotray, Ph.D., Professor and Extension Weed Specialist R oundup Ready Flex cotton provides

Mukhtar, Saqib

167

Designing and Building Houses that are Solar Ready  

Broader source: Energy.gov [DOE]

Builders considering adding photovoltaic (PV) systems to new houses after initial construction is completed can save time and money by following new house Solar Ready design guidelines. Solar Ready houses are designed and built with integrated electrical and mechanical features that streamline the integration of PV systems.

168

Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Morocco UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

169

EM Performs Tenth Technology Readiness Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Performs Tenth Technology Readiness Assessment Performs Tenth Technology Readiness Assessment EM Performs Tenth Technology Readiness Assessment January 31, 2012 - 12:00pm Addthis Employees with Savannah River Remediation, the SRS liquid waste contractor, review mock-ups of the SCIX technology at the Savannah River National Laboratory. Employees with Savannah River Remediation, the SRS liquid waste contractor, review mock-ups of the SCIX technology at the Savannah River National Laboratory. WASHINGTON, D.C. - EM recently completed its tenth Technology Readiness Assessment (TRA) since piloting the TRA process in 2006. A TRA is an intensive peer review process through which the maturity of a technology is evaluated. A TRA utilizes the Technology Readiness Level (TRL) scale pioneered by the National Aeronautics and Space Administration

170

Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Vietnam UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

171

EM Performs Tenth Technology Readiness Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EM Performs Tenth Technology Readiness Assessment EM Performs Tenth Technology Readiness Assessment EM Performs Tenth Technology Readiness Assessment January 31, 2012 - 12:00pm Addthis Employees with Savannah River Remediation, the SRS liquid waste contractor, review mock-ups of the SCIX technology at the Savannah River National Laboratory. Employees with Savannah River Remediation, the SRS liquid waste contractor, review mock-ups of the SCIX technology at the Savannah River National Laboratory. WASHINGTON, D.C. - EM recently completed its tenth Technology Readiness Assessment (TRA) since piloting the TRA process in 2006. A TRA is an intensive peer review process through which the maturity of a technology is evaluated. A TRA utilizes the Technology Readiness Level (TRL) scale pioneered by the National Aeronautics and Space Administration

172

What's Your PEV Readiness Score? | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

What's Your PEV Readiness Score? What's Your PEV Readiness Score? What's Your PEV Readiness Score? February 14, 2013 - 10:30am Addthis PEV readiness is a community-wide effort that requires charging infrastructure, planning, regulations and support services. The new PEV Scorecard helps communities determine their PEV friendliness. | Photo courtesy of IKEA Orlando. PEV readiness is a community-wide effort that requires charging infrastructure, planning, regulations and support services. The new PEV Scorecard helps communities determine their PEV friendliness. | Photo courtesy of IKEA Orlando. Shannon Brescher Shea Communications Manager, Clean Cities Program What does this project do? Clean Cities works to reduce U.S. reliance on petroleum in transportation by establishing local coalitions of public- and

173

Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Ghana UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

174

Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Mexico UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

175

Rough and Ready Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

and Ready Biomass Facility and Ready Biomass Facility Jump to: navigation, search Name Rough and Ready Biomass Facility Facility Rough and Ready Sector Biomass Owner Rough and Ready Lumber Co. Location Cave Junction, Oregon Coordinates 42.1628912°, -123.6481235° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.1628912,"lon":-123.6481235,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

176

DOE Zero Energy Ready Home Case Study: M Street Homes, Houston...  

Office of Environmental Management (EM)

Midland, MI DOE Zero Energy Ready Home Case Study, Mandalay Homes, Phoenix, AZ, Affordable DOE Zero Energy Ready Home Case Study, Caldwell and Johnson, Exeter, RI, Custom Home...

177

Precursor systems analyses of automated highway systems. Activity area C. Automated check-out. Final report, September 1993-November 1994  

SciTech Connect (OSTI)

The activity evaluates potential automatic-to-manual transition scenarios in terms of relative feasibility, safety, cost, and social implications. The check-out alternatives range from minimal testing of the operator and the vehicle to extensive testing of the operator and vehicle. The vehicle functions analysis presents a summary of functions that are critical to safe manual operation and proposes several options for validation. Two possible check-out processes are discussed, one intended for AHS lanes dedicated to automated traffic, and one intended for mixed mode lanes in which AHS and non-AHS vehicles are traveling. The transition to manual control will involve preparing the driver to resume manual operation prior to release of vehicle functions. Proposed tasks which could be used to determine that the driver is ready to receive control of the automated vehicle are examined.

Mangarelli, F.; Cochran, A.; Craig, D.; Michael, B.; Halseth, M.

1995-05-01T23:59:59.000Z

178

Cognitive Engineering Automation and Human  

E-Print Network [OSTI]

· Home automation · Robotics · Unmanned vehicles (UAVs and UGVs) · Drug design/Molecular geneticsCognitive Engineering PSYC 530 Automation and Human Performance Raja Parasuraman #12;Overview Automation-Related Accidents Levels and Stages of Automation Information Acquisition and Analysis Decision

Parasuraman, Raja

179

Automation of Feynman Diagram Evaluation  

E-Print Network [OSTI]

A C-program DIANA (DIagram ANAlyser) for the automation of Feynman diagram evaluations is presented.

M. Tentyukov; J. Fleischer

1998-02-04T23:59:59.000Z

180

Shielded cells transfer automation  

SciTech Connect (OSTI)

Nuclear waste from shielded cells is removed, packaged, and transferred manually in many nuclear facilities. Radiation exposure is absorbed by operators during these operations and limited only through procedural controls. Technological advances in automation using robotics have allowed a production waste removal operation to be automated to reduce radiation exposure. The robotic system bags waste containers out of glove box and transfers them to a shielded container. Operators control the system outside the system work area via television cameras. 9 figures.

Fisher, J J

1984-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Automated Lattice Perturbation Theory  

SciTech Connect (OSTI)

I review recent developments in automated lattice perturbation theory. Starting with an overview of lattice perturbation theory, I focus on the three automation packages currently "on the market": HiPPy/HPsrc, Pastor and PhySyCAl. I highlight some recent applications of these methods, particularly in B physics. In the final section I briefly discuss the related, but distinct, approach of numerical stochastic perturbation theory.

Monahan, Christopher

2014-11-01T23:59:59.000Z

182

Home Network Technologies and Automating Demand Response  

E-Print Network [OSTI]

potential role of home automation networks in implementinghow existing and future home automation systems may providehome networks" and "home automation" are frequently used

McParland, Charles

2010-01-01T23:59:59.000Z

183

Development of Building Automation and Control Systems  

E-Print Network [OSTI]

A design flow for building automation and control systems,Development of Building Automation and Control Systems Yangdesign of the build- ing automation system (including the

Yang, Yang; Zhu, Qi; Maasoumy, Mehdi; Sangiovanni-Vincentelli, Alberto

2012-01-01T23:59:59.000Z

184

Property:Technology Readiness Level | Open Energy Information  

Open Energy Info (EERE)

Readiness Level Readiness Level Jump to: navigation, search Property Name Technology Readiness Level Property Type Text Pages using the property "Technology Readiness Level" Showing 25 pages using this property. (previous 25) (next 25) M MHK Technologies/14 MW OTECPOWER + TRL 5 6 System Integration and Technology Laboratory Demonstration MHK Technologies/Aegir Dynamo + TRL 5 6 System Integration and Technology Laboratory Demonstration MHK Technologies/AirWEC + TRL 5/6: System Integration and Technology Laboratory Demonstration MHK Technologies/Anaconda bulge tube drives turbine + TRL 4 Proof of Concept MHK Technologies/AquaBuoy + TRL 1-3: Discovery / Concept Definition / Early Stage Development & Design & Engineering MHK Technologies/Aquantis + TRL 1 3 Discovery Concept Def Early Stage Dev Design Engineering

185

Energy Department Staff Ready for Hurricane Earl | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy Department Staff Ready for Hurricane Earl Energy Department Staff Ready for Hurricane Earl Energy Department Staff Ready for Hurricane Earl September 3, 2010 - 12:00pm Addthis Patricia A. Hoffman Patricia A. Hoffman Assistant Secretary, Office of Electricity Delivery & Energy Reliability What does this mean for me? You can review updated information on the Energy Department's response efforts, including critical energy infrastructure impacted by the storm and outage and restoration data, through the Emergency Situation Reports. As Category 4 Hurricane Earl heads towards the East Coast, Energy Department emergency responders are in place and ready to go at the National Response Coordination Center in Washington, D.C. and FEMA's Regional Response Coordination Centers in Boston and New York City. The

186

DOE Zero Energy Ready Home: Ventilation and Filtration Strategies...  

Broader source: Energy.gov (indexed) [DOE]

We have these homes so well-air-sealed, we need to look at things like good source control products. Obviously, these homes are so efficient, they're zero energy ready, we have...

187

Are Batteries Ready for Plug-in Hybrid Buyers?  

E-Print Network [OSTI]

237253. Burke, A. , 2007. Batteries and ultracapacitors forresults with lithium-ion batteries. In: Proceedings (CD)locate/tranpol Are batteries ready for plug-in hybrid

Axsen, Jonn; Burke, Andy; Kurani, Kenneth S

2010-01-01T23:59:59.000Z

188

Making existing production systems Industry 4.0-ready  

Science Journals Connector (OSTI)

This paper presents an approach to how existing production systems that are not Industry 4.0-ready can be expanded to participate in an Industry 4.0 factory. Within this paper, a concept ... systems can be discov...

Jan Schlechtendahl; Matthias Keinert; Felix Kretschmer

2014-10-01T23:59:59.000Z

189

DOE Zero Energy Ready Home Webinar: Ducts in Conditioned Space  

Broader source: Energy.gov [DOE]

DOE Challenge Home is a blueprint for zero energy ready homes. When we make that statement its impossible to justify huge thermal losses from ducts in unconditioned spaces. Thats why one of...

190

EV Community Readiness projects: New York City and Lower Hudson...  

Broader source: Energy.gov (indexed) [DOE]

EV Community Readiness projects: New York City and Lower Hudson Valley Clean Communities, Inc. (NY, MA, PA); NYSERDA (ME, NH, VT, MA, RI, CT, NY, NJ, PA, DE, MD, DC) EV Community...

191

DOE Zero Ready Home Case Study: Greenhill Contracting, The Preserve...  

Energy Savers [EERE]

Greenhill Contracting The Preserve New Paltz, NY DOE ZERO ENERGY READY HOME(tm) The U.S. Department of Energy invites home builders across the country to meet the extraordinary...

192

DOE Zero Energy Ready Home: Leganza Residence- Greenbank, Washington  

Broader source: Energy.gov [DOE]

This DOE Zero Energy Ready Home features structural insulated panel walls and roof, a 2-ton ground source heat pump, radiant floor heat, 7.1 kWh PV, and triple-pane windows.

193

Marketing and Sales Solutions for Zero Energy Ready Homes Webinar...  

Broader source: Energy.gov (indexed) [DOE]

of resources that we'll cover. The first are marketing resources that deal with the brand of Zero Energy Ready Home and how it was configured from the very beginning to...

194

Webinar: Marketing and Sales Solutions for Zero Energy Ready Homes  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy Zero Energy Ready Home (ZERH) Program represents a whole new level of home performance, with rigorous requirements that ensure outstanding levels of energy savings,...

195

DOE Zero Energy Ready Home: Durable Energy Builders, Houston, Texas  

Broader source: Energy.gov [DOE]

This DOE Zero Energy Ready Home features super-insulated roof, 11,500 gallon rainwater cistern to supply most of the homes drinking water, hurricane-proof roof, and triple-pane windows.

196

DOE Zero Energy Ready Home Case Study: Green Extreme Homes &...  

Energy Savers [EERE]

Green Extreme Homes & Carl Franklin Homes, Garland, TX DOE Zero Energy Ready Home Case Study: Green Extreme Homes & Carl Franklin Homes, Garland, TX Case study of a DOE Zero Energy...

197

DOE Zero Energy Ready Home: Durable Energy Builders, Houston...  

Energy Savers [EERE]

super-insulated roof, 11,500 gallon rainwater cistern to supply most of the home's drinking water, hurricane-proof roof, and triple-pane windows. DOE Zero Energy Ready Home:...

198

Ghana-REDD Readiness Requires Radical Reform | Open Energy Information  

Open Energy Info (EERE)

Readiness Requires Radical Reform Readiness Requires Radical Reform Jump to: navigation, search Name Ghana-REDD Readiness Requires Radical Reform Agency/Company /Organization UN-REDD Programme Sector Land Focus Area Forestry, Agriculture Topics Implementation, GHG inventory, Policies/deployment programs, Resource assessment, Pathways analysis, Background analysis Resource Type Maps, Guide/manual, Training materials Website http://environment.yale.edu/tf Country Ghana UN Region Western Africa References Ghana-REDD Readiness[1] Summary "The fundamental changes needed for sustainable forest management in Ghana have been known for years, and many large projects have been instigated accordingly. Yet real change has proved elusive. The key challenge now is to get REDD-plus right so that it makes a difference. Dialogue participants

199

LWRS ATR Irradiation Testing Readiness Status  

SciTech Connect (OSTI)

The Light Water Reactor Sustainability (LWRS) Program was established by the U.S. Department of Energy Office of Nuclear Energy (DOE-NE) to develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors. The LWRS Program is divided into four R&D Pathways: (1) Materials Aging and Degradation; (2) Advanced Light Water Reactor Nuclear Fuels; (3) Advanced Instrumentation, Information and Control Systems; and (4) Risk-Informed Safety Margin Characterization. This report describes an irradiation testing readiness analysis in preparation of LWRS experiments for irradiation testing at the Idaho National Laboratory (INL) Advanced Test Reactor (ATR) under Pathway (2). The focus of the Advanced LWR Nuclear Fuels Pathway is to improve the scientific knowledge basis for understanding and predicting fundamental performance of advanced nuclear fuel and cladding in nuclear power plants during both nominal and off-nominal conditions. This information will be applied in the design and development of high-performance, high burn-up fuels with improved safety, cladding integrity, and improved nuclear fuel cycle economics

Kristine Barrett

2012-09-01T23:59:59.000Z

200

Honeywell Demonstrates Automated Demand Response Benefits for...  

Broader source: Energy.gov (indexed) [DOE]

Honeywell Demonstrates Automated Demand Response Benefits for Utility, Commercial, and Industrial Customers Honeywell Demonstrates Automated Demand Response Benefits for Utility,...

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

AUTOMATED CRITICAL PEAK PRICING FIELD TESTS  

E-Print Network [OSTI]

AUTOMATED CRITICAL PEAK PRICING FIELD TESTS: 2006 PROGRAM DESCRIPTION AND RESULTS APPENDICES.................................................................................... 5 B.2. DR Automation Server User Guide

202

Development of Building Automation and Control Systems  

E-Print Network [OSTI]

Johnson Controls, 70 in Automated Logic EIKON language, 42systems developed by Automated Logic. Similarly as shown in

Yang, Yang; Zhu, Qi; Maasoumy, Mehdi; Sangiovanni-Vincentelli, Alberto

2012-01-01T23:59:59.000Z

203

Automation Status | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Automation Status Automation Status Presented at the NREL Hydrogen and Fuel Cell Manufacturing R&D Workshop in Washington, DC, August 11-12, 2011. mfg2011plenarysperrick.pdf More...

204

Automation on the laboratory bench  

Science Journals Connector (OSTI)

Automation on the laboratory bench ... In designing an automation kit the authors attempted to give chemistry a system which is versatile and easy to apply in taking over the boring and difficult task of controlling parameters manually. ...

M. Legrand; A. Foucard

1978-01-01T23:59:59.000Z

205

Automation: Congress' Next Probe  

Science Journals Connector (OSTI)

THE stage is being set for a Congressional investigation of the trend toward automation in industry. From all indications, this could become one of the hottest subjects in labor-management relations during the coming year.Formal hearings have been ...

1955-08-29T23:59:59.000Z

206

Automation of Capacity Bidding with an Aggregator Using Open Automated Demand Response  

E-Print Network [OSTI]

ProtocolforBuildingAutomationandControl Networks. ProtocolforBuildingAutomationandControl Networks,DemandResponseAutomationServer DemandResponseResearch

Kiliccote, Sila

2011-01-01T23:59:59.000Z

207

Are You Ready for Fall? | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Are You Ready for Fall? Are You Ready for Fall? Are You Ready for Fall? October 21, 2011 - 6:38am Addthis This week, Andrea talked about insulating her water heater tank in preparation for cooler weather (of course, that's something you can do any time of year to save money and energy at home). She also listed many other ways to reduce your water heating costs. Erin blogged about something we don't often think about: the historical perspective of using renewable energy. For example, Leonardo da Vinci had designed a solar powered water heater among other things. As for geothermal energy, archaeological evidence shows that the first human use of geothermal resources in North America occurred more than 10,000 years ago. Whether you're using renewables or energy efficiency (or both), what are

208

Ready to Retrofit: The Process of Project Team Selection, Building  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ready to Retrofit: The Process of Project Team Selection, Building Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects Title Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects Publication Type Report LBNL Report Number LBNL-5893E Year of Publication 2012 Authors Sanders, Mark D., Kristen Parrish, and Paul A. Mathew Publisher LBNL Abstract This guide provides an introduction and overview to the retrofit process and then dives deeper into the key activities that an owner can influence most in the retrofit process: (1) Selecting Your Project Team, (2) Benchmarking Your Building, and (3) Financing Your Energy Efficiency Projects* Building Energy Retrofit Overview will provide you a simple explanation of the retrofit process, the project stages and the players involved.

209

REDD+ Country Readiness Preparation Proposals | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » REDD+ Country Readiness Preparation Proposals Jump to: navigation, search Tool Summary LAUNCH TOOL Name: REDD+ Country Readiness Preparation Proposals Agency/Company /Organization: World Resources Institute Focus Area: Forestry Topics: Implementation, Policies/deployment programs, Pathways analysis Resource Type: Publications, Guide/manual Website: www.wri.org/publication/getting-ready Country: Democratic Republic of Congo, Ghana, Guyana, Indonesia, Madagascar, Mexico, Suriname, Panama Middle Africa, Western Africa, South America, South-Eastern Asia, Eastern Africa, Central America, South America, Central America

210

SRS Tank 48H Waste Treatment Project Technology Readiness Assessment  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site Tank 48H Savannah River Site Tank 48H Waste Treatment Project Technology Readiness Assessment Harry D. Harmon Joan B. Berkowitz John C. DeVine, Jr. Herbert G. Sutter Joan K. Young SPD-07-195 July 31, 2007 Prepared by the U.S. Department of Energy Aiken, South Carolina SRS Tank 48H Waste Treatment Project SPD-07-195 Technology Readiness Assessment July 31, 2007 Signature Page 7/31/07 ___________________________ _________________________ John C. DeVine, Jr., Team Member Date SRS Tank 48H Waste Treatment Project SPD-07-195 Technology Readiness Assessment July 31, 2007 Executive Summary The purpose of this assessment was to determine the technology maturity level of the candidate Tank 48H treatment technologies that are being considered for implementation at DOE's

211

Training Program Graduates Weatherization-Ready Workers | Department of  

Broader source: Energy.gov (indexed) [DOE]

Training Program Graduates Weatherization-Ready Workers Training Program Graduates Weatherization-Ready Workers Training Program Graduates Weatherization-Ready Workers April 29, 2010 - 5:45pm Addthis Daniel Tello demonstrates how to prepare an attic space for insulation using skills learned from the First Choice Program. | Photo courtesy of HCDC, Human Capital Development Corp., Inc. and Scott Anderson Daniel Tello demonstrates how to prepare an attic space for insulation using skills learned from the First Choice Program. | Photo courtesy of HCDC, Human Capital Development Corp., Inc. and Scott Anderson Lindsay Gsell On graduation day, students at Human Capital Development Corp., Inc. (HCDC) leave with more than just a diploma. They receive a hard hat, tool belt, hammer, utility knife and a tape measure. Graduates from Racine, Wis.-based HCDC First Choice Program are literally

212

LEDs Ready for Takeoff at Louisiana Airport | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

LEDs Ready for Takeoff at Louisiana Airport LEDs Ready for Takeoff at Louisiana Airport LEDs Ready for Takeoff at Louisiana Airport July 14, 2010 - 3:34pm Addthis Hammond, La., airport is replacing the existing incandescent taxiway lights (pictured) with LEDs. | Photo courtesy of Hammond Northshore Regional Airport Hammond, La., airport is replacing the existing incandescent taxiway lights (pictured) with LEDs. | Photo courtesy of Hammond Northshore Regional Airport Stephen Graff Former Writer & editor for Energy Empowers, EERE What are the key facts? Upgrades for safety, energy at Hammond airport possible through Recovery Act Taxiway lights to be replaced with LEDs Airport could save up to $15,000 annually on electric bills Energy efficiency is taking off at the airport in Hammond, La., about 70

213

Fast pandemic detection tool ready to fight flu  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fast pandemic detection tool ready to fight flu Fast pandemic detection tool ready to fight flu Fast pandemic detection tool ready to fight flu Researchers are developing new tools for rapidly characterizing biological pathogens that could give rise to potentially deadly pandemics such as Influenza A (H1N1). June 9, 2009 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

214

Launching Apps for Energy! Developers, Are You Ready? | Department of  

Broader source: Energy.gov (indexed) [DOE]

Apps for Energy! Developers, Are You Ready? Apps for Energy! Developers, Are You Ready? Launching Apps for Energy! Developers, Are You Ready? April 5, 2012 - 4:00pm Addthis Apps for Energy is open for submissions. Sign-up at appsforenergy.challenge.gov. Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs What are the key facts? Today, the Energy Department's Apps for Energy competition is open for submissions. Apps for Energy leverages Green Button -- an open standard for sharing utility data. Developers who build the best apps win part of a $100,000 cash prize. May 15 is the last day to submit an app. To submit your app design, signup at appsforenergy.challenge.gov The Energy Department's first ever Apps for Energy competition is officially open for submissions, starting today.

215

LEDs Ready for Takeoff at Louisiana Airport | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

LEDs Ready for Takeoff at Louisiana Airport LEDs Ready for Takeoff at Louisiana Airport LEDs Ready for Takeoff at Louisiana Airport July 14, 2010 - 3:34pm Addthis Hammond, La., airport is replacing the existing incandescent taxiway lights (pictured) with LEDs. | Photo courtesy of Hammond Northshore Regional Airport Hammond, La., airport is replacing the existing incandescent taxiway lights (pictured) with LEDs. | Photo courtesy of Hammond Northshore Regional Airport Stephen Graff Former Writer & editor for Energy Empowers, EERE What are the key facts? Upgrades for safety, energy at Hammond airport possible through Recovery Act Taxiway lights to be replaced with LEDs Airport could save up to $15,000 annually on electric bills Energy efficiency is taking off at the airport in Hammond, La., about 70

216

UNDP Readiness for Climate Finance | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » UNDP Readiness for Climate Finance Jump to: navigation, search Tool Summary Name: UNDP Readiness for Climate Finance Agency/Company /Organization: United Nations Development Programme (UNDP) Sector: Climate Focus Area: Renewable Energy Phase: Evaluate Options Topics: Co-benefits assessment, - Energy Access, Finance, Low emission development planning, -LEDS Resource Type: Guide/manual, Publications Website: www.undp.org/content/undp/en/home/librarypage/environment-energy/low_e Cost: Free Language: English The paper presents a framework for understanding what it means to be "ready" to use climate finance in a transformative way at the national level. In the context of the financial challenges posed by climate change,

217

Are You Ready to Make a Difference? | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Are You Ready to Make a Difference? Are You Ready to Make a Difference? Are You Ready to Make a Difference? September 27, 2010 - 2:23pm Addthis Secretary of Energy Steven Chu talks about the influence of his physics teacher. John Schueler John Schueler Former New Media Specialist, Office of Public Affairs Providing America's students with a quality education is essential to ensuring that we can continue to be leaders of innovation and industry, and we can't fulfill that responsibility without quality teachers. There is already a great need for skilled math and science teachers and with many of the most accomplished educators approaching retirement age, the demand for specialists in those fields will only grow in the coming years. That's why public figures like Secretary Chu are sharing the personal impact that

218

Energy Department Emergency Response Team Ready to Respond to Hurricane  

Broader source: Energy.gov (indexed) [DOE]

Department Emergency Response Team Ready to Respond to Department Emergency Response Team Ready to Respond to Hurricane Irene Energy Department Emergency Response Team Ready to Respond to Hurricane Irene August 26, 2011 - 12:15pm Addthis Hurricane Irene made landfall at approximately 7:30 am EDT near Cape Lookout, North Carolina with maximum sustained winds of 85 mph (Category 1). This NOAA GOES-13 satellite image captures Irene’s landfall moment. | Image courtesy of NOAA Hurricane Irene made landfall at approximately 7:30 am EDT near Cape Lookout, North Carolina with maximum sustained winds of 85 mph (Category 1). This NOAA GOES-13 satellite image captures Irene's landfall moment. | Image courtesy of NOAA Patricia A. Hoffman Patricia A. Hoffman Assistant Secretary, Office of Electricity Delivery & Energy Reliability

219

Are You Ready for Fall? | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Are You Ready for Fall? Are You Ready for Fall? Are You Ready for Fall? October 21, 2011 - 6:38am Addthis This week, Andrea talked about insulating her water heater tank in preparation for cooler weather (of course, that's something you can do any time of year to save money and energy at home). She also listed many other ways to reduce your water heating costs. Erin blogged about something we don't often think about: the historical perspective of using renewable energy. For example, Leonardo da Vinci had designed a solar powered water heater among other things. As for geothermal energy, archaeological evidence shows that the first human use of geothermal resources in North America occurred more than 10,000 years ago. Whether you're using renewables or energy efficiency (or both), what are

220

Tank Waste Feed Delivery System Readiness at the Hanford Site  

Broader source: Energy.gov (indexed) [DOE]

Audit Report Audit Report Tank Waste Feed Delivery System Readiness at the Hanford Site OAS-L-12-09 August 2012 Department of Energy Washington, DC 20585 August 23, 2012 MEMORANDUM FOR THE MANAGER, OFFICE OF RIVER PROTECTION FROM: David Sedillo, Director Western Audits Division Office of Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Tank Waste Feed Delivery System Readiness at the Hanford Site" BACKGROUND The Department of Energy's largest cleanup task involves the treatment, immobilization and disposal of 56 million gallons of hazardous and highly radioactive waste at the Hanford Site, located in Southeastern Washington State. As part of this effort, the Department is constructing

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

EMERGENCY READINESS ASSURANCE PLAN (ERAP) FOR FISCAL YEAR (FY) 2014  

SciTech Connect (OSTI)

This Emergency Readiness Assurance Plan (ERAP) for Fiscal Year (FY) 2014 in accordance with DOE O 151.1C, Comprehensive Emergency Management System. The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for FY-15. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, INL Emergency Plan/RCRA Contingency Plan.

Shane Bush

2014-09-01T23:59:59.000Z

222

Technology Readiness Assessment of Department of Energy Waste Processing Facilities: When is a Technology Ready for Insertion?  

SciTech Connect (OSTI)

This paper will describe a technology readiness assessment process (TRA) that the U.S. Department of Energy (DOE) piloted at Hanford's Waste Treatment and Immobilization Plant (WTP) and has subsequently applied to other projects at Hanford and the Savannah River Site. The methodology used for these TRAs was based upon detailed guidance contained in the U.S. Department of Defense (DoD), Technology Readiness Assessment Desk-book and adapted a technology readiness scale developed by the DOD and National Aeronautics and Space Administration (NASA) to the DOE. This paper will discuss the application of the TRA process to the WTP and the development of a Technology Maturation Plan (TMP) based on the TRA findings. (authors)

Alexander, D. [Department of Energy, Office of River Protection, Richland, Washington (United States); Gerdes, K. [Department of Energy, Office of Waste Processing, Germantown, Maryland (United States); Holton, L. [Pacific Northwest National Laboratory, Richland, Washington (United States); Krahn, St. [Department of Energy, Office of Waste Processing, Germantown, Maryland (United States); Sutter, H. [Consultant, Department of Energy, Office of Project Recovery, Germantown, Maryland (United States)

2008-07-01T23:59:59.000Z

223

Automated gas chromatography  

DOE Patents [OSTI]

An apparatus and process for the continuous, near real-time monitoring of low-level concentrations of organic compounds in a liquid, and, more particularly, a water stream. A small liquid volume of flow from a liquid process stream containing organic compounds is diverted by an automated process to a heated vaporization capillary where the liquid volume is vaporized to a gas that flows to an automated gas chromatograph separation column to chromatographically separate the organic compounds. Organic compounds are detected and the information transmitted to a control system for use in process control. Concentrations of organic compounds less than one part per million are detected in less than one minute. 7 figs.

Mowry, C.D.; Blair, D.S.; Rodacy, P.J.; Reber, S.D.

1999-07-13T23:59:59.000Z

224

Financing Capture Ready Coal-Fired Power Plants in China by Issuing Capture Options  

E-Print Network [OSTI]

Capture Ready is a design concept enabling fossil fuel plants to be retrofitted more economically with carbon dioxide capture and storage (CCS) technologies, however financing the cost of capture ready can be problematic, especially...

Liang, Xi; Reiner, David; Gibbons, Jon; Li, Jia

225

DOE Zero Energy Ready Home Case Study: Boulder ZED Design Build...  

Energy Savers [EERE]

Study: Boulder ZED Design Build - Boulder, Colorado DOE Zero Energy Ready Home Case Study: Boulder ZED Design Build - Boulder, Colorado Case study of a DOE Zero Energy Ready Home...

226

DOE Zero Energy Ready Home Case Study: Green Extreme Homes & Carl Franklin Homes, Garland, TX  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready affordable home in Garland, TX, that was the first retrofit home certified to the DOE Zero Energy Ready home requirements. The construction team achieved a...

227

Zero Energy-Ready Single-Family Homes - Building America Top...  

Energy Savers [EERE]

Zero Energy-Ready Single-Family Homes - Building America Top Innovation Zero Energy-Ready Single-Family Homes - Building America Top Innovation Photo of a zero-energy,...

228

DOE Zero Energy Ready Home Case Study: Clifton View Homes, Whidbey...  

Energy Savers [EERE]

Study: Clifton View Homes, Whidbey Island, WA DOE Zero Energy Ready Home Case Study: Clifton View Homes, Whidbey Island, WA Case study of a DOE Zero Energy Ready home on Whidbey...

229

DOE Zero Energy Ready Home Case Study: M Street Homes, Houston...  

Energy Savers [EERE]

Study: M Street Homes, Houston, TX DOE Zero Energy Ready Home Case Study: M Street Homes, Houston, TX Case study of a DOE Zero Energy Ready home in Houston, TX, that achieves a...

230

DOE Zero Energy Ready Home Case Study: One Sky Homes, San Jose...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

One Sky Homes, San Jose, CA DOE Zero Energy Ready Home Case Study: One Sky Homes, San Jose, CA DOE Zero Energy Ready Home Case Study: One Sky Homes, San Jose, CA Case study of a...

231

What to Expect When Readying to Move Spent Nuclear Fuel from...  

Broader source: Energy.gov (indexed) [DOE]

What to Expect When Readying to Move Spent Nuclear Fuel from Commercial Nuclear Power Plants What to Expect When Readying to Move Spent Nuclear Fuel from Commercial Nuclear Power...

232

Computer vs. Video Game System: Ready to Rumble in the #EnergyFaceoff...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Computer vs. Video Game System: Ready to Rumble in the EnergyFaceoff Jungle Computer vs. Video Game System: Ready to Rumble in the EnergyFaceoff Jungle November 4, 2014 - 10:20am...

233

DOE Zero Energy Ready Home Case Study: BPC Green Builders, Danbury...  

Energy Savers [EERE]

Study: BPC Green Builders, Danbury, CT DOE Zero Energy Ready Home Case Study: BPC Green Builders, Danbury, CT Case study of a DOE Zero Energy Ready home in Danbury, CT, that scored...

234

DOE Zero Energy Ready Home Case Study, New Town Builders, Denver...  

Office of Environmental Management (EM)

New Town Builders, Denver, CO, Production Home DOE Zero Energy Ready Home Case Study, New Town Builders, Denver, CO, Production Home Case study of a DOE Zero Energy Ready Home in...

235

DOE Zero Energy Ready Home Case Study 2013: Manatee County Habitat...  

Energy Savers [EERE]

Energy Ready Home has a 2.5-kW PV system obtained with assistance from Florida Power and Light. All of the homes in the development are solar-energy ready with conduit in place...

236

DOE Zero Energy Ready Home Case Study: BPC Green Builders, Danbury...  

Broader source: Energy.gov (indexed) [DOE]

BPC Green Builders, Danbury, CT DOE Zero Energy Ready Home Case Study: BPC Green Builders, Danbury, CT Case study of a DOE Zero Energy Ready home in Danbury, CT, that scored HERS...

237

Automated Job Hazards Analysis  

Broader source: Energy.gov [DOE]

AJHA Program - The Automated Job Hazard Analysis (AJHA) computer program is part of an enhanced work planning process employed at the Department of Energy's Hanford worksite. The AJHA system is routinely used to performed evaluations for medium and high risk work, and in the development of corrective maintenance work packages at the site. The tool is designed to ensure that workers are fully involved in identifying the hazards, requirements, and controls associated with tasks.

238

CCSI Technology Readiness Levels Likelihood Model (TRL-LM) Users Guide  

SciTech Connect (OSTI)

This is the manual for the Carbon Capture Simulation Initiative (CCSI) Technology Readiness Level Likelihood model based on PNNL velo.

Engel, David W.; Dalton, Angela C.; Sivaramakrishnan, Chandrika; Lansing, Carina

2013-03-26T23:59:59.000Z

239

DOE Zero Energy Ready Home Case Study: Shore Road Project- Old Greenwich, Connecticut  

Broader source: Energy.gov [DOE]

This case study describes the builder Murphy Brothers' first DOE Zero Energy Ready Home in Old Greenwich, CT.

240

Quality Management Systems for Zero Energy Ready Home Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, Quality Management Systems for Zero Energy Ready Home, presented in October 2014.

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Text-Alternative Version: ENERGY STAR for SSL: Getting Ready for September 30  

Broader source: Energy.gov [DOE]

Below is the text-alternative version of the ENERGY STAR for SSL: Getting Ready for September 30 webcast.

242

DOE Hydrogen and Fuel Cell Overview: 2011 Hydrogen Infrastructure Market Readiness Workshop  

Broader source: Energy.gov [DOE]

Presentation by Sunita Satyapal at the Hydrogen Infrastructure Market Readiness Workshop, February 16, 2011, in Washington, DC.

243

Energy Flow: A Multimodal `Ready' Indication For Electric Vehicles  

E-Print Network [OSTI]

Energy Flow: A Multimodal `Ready' Indication For Electric Vehicles Abstract The lack of sound and vibration while starting the drive system of an electric vehicle (EV) is one of the major differences the energy level to the driver. With Energy Flow (see Figure 1), we test if there will be a benefit in terms

244

Shunting passenger trains: getting ready for Marjan van den Akker  

E-Print Network [OSTI]

Shunting passenger trains: getting ready for departure Marjan van den Akker Hilbrandt Baarsma Utrecht University P.O. Box 80.089 3508 TB Utrecht The Netherlands #12;Shunting passenger trains: getting of shunting train units on a railway station. Train units arrive at and depart from the station according

Utrecht, Universiteit

245

Verification of Readiness to Start Up or Restart Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes requirements for verifying readiness for startup of new Hazard Category 1, 2, and 3 nuclear facilities, activities, and operations, and for restart of existing Hazard Category 1, 2, and 3 nuclear facilities, activities, and operations that have been shut down. Cancels DOE O 425.1C. Adm Chg 1, dated 4-2-13.

2010-04-16T23:59:59.000Z

246

AT&TConsulting HITECH Security Readiness Assessment Bundle  

E-Print Network [OSTI]

regarding the safeguarding of Protected Health Information (PHI). Approach Upon engagement with AT Rule - Administrative Safeguards (164.308) - Physical Safeguards (164.310) Benefits · Cost · Readiness Report Product Brief #12;- Technical Safeguards (164.312) - Organizational Requirements (164

Fisher, Kathleen

247

Operational Readiness Review: Savannah River Replacement Tritium Facility  

SciTech Connect (OSTI)

The Operational Readiness Review (ORR) is one of several activities to be completed prior to introducing tritium into the Replacement Tritium Facility (RTF) at the Savannah River Site (SRS). The Secretary of Energy will rely in part on the results of this ORR in deciding whether the startup criteria for RTF have been met. The RTF is a new underground facility built to safely service the remaining nuclear weapons stockpile. At RTF, tritium will be unloaded from old components, purified and enriched, and loaded into new or reclaimed reservoirs. The RTF will replace an aging facility at SRS that has processed tritium for more than 35 years. RTF has completed construction and is undergoing facility startup testing. The final stages of this testing will require the introduction of limited amounts of tritium. The US Department of Energy (DOE) ORR was conducted January 19 to February 4, 1993, in accordance with an ORR review plan which was developed considering previous readiness reviews. The plan also considered the Defense Nuclear Facilities Safety Board (DNFSB) Recommendations 90-4 and 92-6, and the judgements of experienced senior experts. The review covered three major areas: (1) Plant and Equipment Readiness, (2) Personnel Readiness, and (3) Management Systems. The ORR Team was comprised of approximately 30 members consisting of a Team Leader, Senior Safety Experts, and Technical Experts. The ORR objectives and criteria were based on DOE Orders, industry standards, Institute of Nuclear Power Operations guidelines, recommendations of external oversight groups, and experience of the team members.

Not Available

1993-02-01T23:59:59.000Z

248

DOE Zero Energy Ready Home: Montlake Modern- Seattle, Washington  

Broader source: Energy.gov [DOE]

This DOE Zero Energy Ready Home features structural insulated panel walls and roof, an air-to-water heat pump plus radiant floor heat; 100% LED lighting; filtered-fan-powered fresh air intake; triple-pane windows, and 9.7 kWh PV for electric car charging station.

249

Colorado Community Readiness Efforts for PEVs Support State Policy Development  

Office of Energy Efficiency and Renewable Energy (EERE)

Project FEVER (Fostering Electric Vehicle Expansion in the Rockies), funded by EEREs Clean Cities plug-in electric vehicle community readiness award, has supported the development of Colorado state policies to accelerate the adoption of plug-in electric vehicles (PEVs).

250

U.S. Department of Energy Technology Readiness Assessment Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide assists individuals and teams involved in conducting Technology Readiness Assessments and developing Technology Maturation Plans for the DOE capital acquisition asset projects subject to DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06. Canceled by DOE G 413.3-4A. Does not cancel other directives.

2009-10-12T23:59:59.000Z

251

DOE Zero Energy Ready Home: Leganza Residence - Greenbank, Washington...  

Energy Savers [EERE]

panel (SIPs) walls, a 10.25-inch SIPS roof, an R-20 insulated slab, a 2-ton ground source heat pump, radiant floor heat, 7.1 kWh PV, and triple-pane windows. DOE Zero Energy Ready...

252

TJ Automation | Open Energy Information  

Open Energy Info (EERE)

TJ Automation TJ Automation Jump to: navigation, search Name TJ Automation Facility TJ Automation Sector Wind energy Facility Type Small Scale Wind Facility Status In Service Owner TJ Automation Energy Purchaser TJ Automation Location Archbold OH Coordinates 41.45823855°, -84.30666804° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.45823855,"lon":-84.30666804,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

253

INVESTMENT READINESS PROGRAMMES AND ACCESS TO FINANCE: A CRITICAL REVIEW OF  

E-Print Network [OSTI]

1 INVESTMENT READINESS PROGRAMMES AND ACCESS TO FINANCE: A CRITICAL REVIEW OF DESIGN ISSUES Colin.entrepreneur.strath.ac.uk #12;1 INVESTMENT READINESS PROGRAMMES AND ACCESS TO FINANCE: A CRITICAL REVIEW OF DESIGN ISSUES+ Colin are not investment ready. Their owners are unwilling to seek external equity finance and those who are willing do

Mottram, Nigel

254

Report blasts Patent Office automation  

Science Journals Connector (OSTI)

Report blasts Patent Office automation ... The Department of Commerce is moving quickly to implement a report highly critical of the Patent & Trademark Office's efforts to fully automate its patent search and retrieval operations. ... An Industry Review Panel found that the current automated patent system is over-designed and as a result needs a redundant communications network and redundant storage of all patent images at high resolution. ...

JANICE LONG

1988-05-30T23:59:59.000Z

255

Virtual Machine in Automation Projects.  

E-Print Network [OSTI]

?? Virtual machine, as an engineering tool, has recently been introduced into automation projects in Tetra Pak Processing System AB. The goal of this paper (more)

Xing, Xiaoyuan

2010-01-01T23:59:59.000Z

256

AUTOMATED ~.JELDING -RESEARCH NEEDS T. H. Eagar  

E-Print Network [OSTI]

) ) ..... . '. AUTOMATED ~.JELDING - RESEARCH NEEDS T. H. Eagar Department of Naterials Science and Engineering Nassachusetts Institute of Technology Cambridge, Hassachusetts 02139 Increased use of automated is necessary in order to develop reliable automated welding techniques. #12;Introduction During the past decade

Eagar, Thomas W.

257

Automation improves personal effectiveness while reducing drudgery  

Science Journals Connector (OSTI)

Automation improves personal effectiveness while reducing drudgery ... "The term automation ," says one Department of Labor official with undisguised feeling, "is a hopeless semantic jungle." ... One industry man defines automation very loosely as any way of doing things better with machines. ...

1966-03-14T23:59:59.000Z

258

Savannah River Site Salt Waste Processing Facility Technology Readiness Assessment Report  

Broader source: Energy.gov (indexed) [DOE]

Salt Waste Processing Facility Salt Waste Processing Facility Technology Readiness Assessment Report Kurt D. Gerdes Harry D. Harmon Herbert G. Sutter Major C. Thompson John R. Shultz Sahid C. Smith July 13, 2009 Prepared by the U.S. Department of Energy Washington, D.C. SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 ii This page intentionally left blank SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 iii SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 iii Signatures SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 iv This page intentionally left blank SRS Salt Waste Processing Facility

259

Northwest Open Automated Demand Response Technology Demonstration Project  

E-Print Network [OSTI]

Facility Technician) Automated Logic Corporation: Ivanembedded in the Targets Automated Logic Corporation (ALC)

Kiliccote, Sila

2010-01-01T23:59:59.000Z

260

Tarim Tazhong IV remote control in a severe environment made possible through automation  

SciTech Connect (OSTI)

With the world`s largest population, China`s energy requirements are growing at a phenomenal rate. The Tarim Basin in the Taklimakau Desert in Western China promises to be one of the largest sources of onshore petroleum discovered to date. A history of field development as well as plans and mechanics for making these resources available to the population are discussed. The extreme desert conditions make each production step a challenge. One of the major design hurdles was the necessity of complete plant automation with hot spare units that were always on ready standby.

McKinley, H.K. [Honeywell Industrial Automation and Control, Phoenix, AZ (United States); Bird, G. [Honeywell Asia Pacific, Lorong (Singapore); Wang, A. [Honeywell China Inc., Beijing (China); Wu, M.Z.; Jie, Y.X. [Tarim Petroleum Exploration and Development Bureau, Xinjiang (China)

1997-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Automation of One-Loop Calculations with GoSam: Present Status and Future Outlook  

E-Print Network [OSTI]

In this presentation, we describe the GoSam (Golem/Samurai) framework for the automated computation of multi-particle scattering amplitudes at the one-loop level. The amplitudes are generated analytically in terms of Feynman diagrams, and can be evaluated using either D-dimensional integrand reduction or tensor decomposition. GoSam can be used to compute one-loop corrections to Standard Model (QCD and EW) processes, and it is ready to link generic model files for theories Beyond SM. We show the main features of GoSam through its application to several examples of different complexity.

Gavin Cullen; Nicolas Greiner; Gudrun Heinrich; Gionata Luisoni; Pierpaolo Mastrolia; Giovanni Ossola; Thomas Reiter; Francesco Tramontano

2011-11-14T23:59:59.000Z

262

Automated fiber pigtailing machine  

DOE Patents [OSTI]

The Automated Fiber Pigtailing Machine (AFPM) aligns and attaches optical fibers to optoelectronic (OE) devices such as laser diodes, photodiodes, and waveguide devices without operator intervention. The so-called pigtailing process is completed with sub-micron accuracies in less than 3 minutes. The AFPM operates unattended for one hour, is modular in design and is compatible with a mass production manufacturing environment. This machine can be used to build components which are used in military aircraft navigation systems, computer systems, communications systems and in the construction of diagnostics and experimental systems. 26 figs.

Strand, O.T.; Lowry, M.E.

1999-01-05T23:59:59.000Z

263

Chapter 11 - Industrial Automation  

Science Journals Connector (OSTI)

The industrial systems of the future are complex systems composed of vast numbers of devices interacting with each other and with enterprise systems. Modern technologies such as web services, service-oriented architectures (SOAs), the cloud, etc. make it possible for sophisticated infrastructures to emerge in future factories. We take a closer look at key visionary aspects that are expected to be introduced in the industrial automation domain in the years to come, and the pivotal role of M2M and IoT. Additionally, we investigate the impact on the collaboration of machines among themselves and with enterprise systems and their services.

Jan Hller; Vlasios Tsiatsis; Catherine Mulligan; Stamatis Karnouskos; Stefan Avesand; David Boyle

2014-01-01T23:59:59.000Z

264

Automating dipole subtraction  

E-Print Network [OSTI]

We report on automating the Catani-Seymour dipole subtraction which is a general procedure to treat infrared divergences in real emission processes at next-to-leading order in QCD. The automatization rests on three essential steps: the creation of the dipole terms, the calculation of the color linked squared Born matrix elements, and the evaluation of different helicity amplitudes. The routines have been tested for a number of complex processes, such as the real emission process gg --> t anti-t ggg.

K. Hasegawa; S. Moch; P. Uwer

2008-07-23T23:59:59.000Z

265

Installation and Commissioning Automated Demand Response Systems  

E-Print Network [OSTI]

their partnership in demand response automation research andand Techniques for Demand Response. LBNL Report 59975. Mayof Fully Automated Demand Response in Large Facilities.

Kiliccote, Sila; Global Energy Partners; Pacific Gas and Electric Company

2008-01-01T23:59:59.000Z

266

Home Network Technologies and Automating Demand Response  

E-Print Network [OSTI]

and Automating Demand Response Charles McParland, Lawrenceand Automating Demand Response Charles McParland, LBNLCommercial and Residential Demand Response Overview of the

McParland, Charles

2010-01-01T23:59:59.000Z

267

Automation in X-Ray Crystallography  

Science Journals Connector (OSTI)

Automation in X-Ray Crystallography ... But in the past few years, automation procedures have been applied to intrinsically superior experimental methods. ...

S.C. ABRAHAMS

1963-06-03T23:59:59.000Z

268

Understanding roi metrics for software test automation.  

E-Print Network [OSTI]

??Software test automation is widely accepted as an efficient software testing technique. However, automation has failed to deliver the expected productivity more often than not. (more)

Jayachandran, Naveen

2005-01-01T23:59:59.000Z

269

Planning and Conduct of Operational Readiness Reviews (ORR)  

Broader source: Energy.gov (indexed) [DOE]

DOE-STD-3006-2000 DOE-STD-3006-2000 June 2000 Superseding DOE-STD-3006-95 November 1995 DOE STANDARD PLANNING AND CONDUCT OF OPERATIONAL READINESS REVIEWS (ORR) U.S. Department of Energy AREA OPER Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823 Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. DOE-STD-3006-2000 iii PLANNING AND CONDUCT OF OPERATIONAL READINESS REVIEWS (ORR)

270

Sandia National Laboratories' Readiness in Technical Base and Facilities Program  

Broader source: Energy.gov (indexed) [DOE]

Sandia National Laboratories' Sandia National Laboratories' Readiness in Technical Base and Facilities Program OAS-L-13-13 September 2013 Department of Energy Washington, DC 20585 September 5, 2013 MEMORANDUM FOR THE MANAGER, SANDIA FIELD OFFICE FROM: David Sedillo, Director Western Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Sandia National Laboratories' Readiness in Technical Base and Facilities Program" BACKGROUND The Department of Energy's (Department) Sandia National Laboratories (Sandia) is a Government-owned, contractor operated Laboratory that is part of the National Nuclear Security Administration's (NNSA) nuclear weapons complex. One of Sandia's key missions is to ensure the safety, reliability and performance of the Nation's nuclear weapons stockpile. To accomplish

271

The Valles Caldera is ready for its close-up  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

January 2013 » January 2013 » The Valles Caldera Is Ready For Its Close-up Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit The Valles Caldera is ready for its close-up The first of three documentaries on the Valles Caldera could air on the local Public Broadcasting System as soon as January. January 1, 2013 dummy image Read our archives Contacts Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email The piece explores the potential impact of climate change and the 2011 Los Conchas fire on the sensitive ecosystem in the area. The first of three documentaries on the Valles Caldera could air on the local Public Broadcasting System (KNME) as soon as January. The piece, called Valles Caldera: The Science, explores the potential impact of

272

Technology Readiness Levels for Advanced Nuclear Fuels and Materials Development  

SciTech Connect (OSTI)

The Technology Readiness Level (TRL) process is used to quantitatively assess the maturity of a given technology. The TRL process has been developed and successfully used by the Department of Defense (DOD) for development and deployment of new technology and systems for defense applications. In addition, NASA has also successfully used the TRL process to develop and deploy new systems for space applications. Advanced nuclear fuels and materials development is a critical technology needed for closing the nuclear fuel cycle. Because the deployment of a new nuclear fuel forms requires a lengthy and expensive research, development, and demonstration program, applying the TRL concept to the advanced fuel development program is very useful as a management and tracking tool. This report provides definition of the technology readiness level assessment process as defined for use in assessing nuclear fuel technology development for the Advanced Fuel Campaign (AFC).

Jon Carmack

2014-01-01T23:59:59.000Z

273

DOE Challenge Home Consolidated Renewable Energy Ready Checklist  

Broader source: Energy.gov (indexed) [DOE]

Consolidated Consolidated Renewable Energy Ready Checklist DOE Challenge Home National Program Requirements Mandatory Requirement 7 (Renewable Ready) shall be met by any home certified under the DOE Challenge Home program, only where all three conditions of the following conditions are met: 1. Location, based on zip code has at least 5 kWh/m 2 /day average daily solar radiation based on annual solar insolation using PVWatts online tool: http://gisatnrel.nrel.gov/PVWatts_Viewer/index.html AND; 2. Location does not have significant natural shading (e.g., trees, tall buildings on the south- facing roof, AND; 3. Home as designed has adequate free roof area within +/-45° of true south as noted in the table below. Note that in some cases a house may have insufficient roof area for the Solar

274

Marine and Hydrokinetic Technology Readiness Level | Open Energy  

Open Energy Info (EERE)

Marine and Hydrokinetic Technology Readiness Level Marine and Hydrokinetic Technology Readiness Level Jump to: navigation, search << Return to the MHK database homepage This field indicates the stage of development/deployment that technologies, which are undergoing partial or full-scale device testing, are currently in. Contents 1 TRL 1-3: Discovery / Concept Definition / Early Stage Development, Design, and Engineering 2 TRL 4: Proof of Concept 3 TRL 5/6: System Integration and Technology Laboratory Demonstration 4 TRL 7/8: Open Water System Testing, Demonstration, and Operation 5 TRL 9: Commercial-Scale Production / Application TRL 1-3: Discovery / Concept Definition / Early Stage Development, Design, and Engineering The purpose of this stage is to evaluate, to the largest extent possible, the scientific or technical merit and feasibility of ideas that appear to

275

Verification of Readiness to Start Up or Restart Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes requirements for verifying readiness for startup of new Hazard Category 1, 2, and 3 nuclear facilities, activities, and operations, and for restart of existing Hazard Category 1, 2, and 3 nuclear facilities, activities, and operations that have been shut down. Cancels DOE O 425.1C. Adm Chg 1, dated 4-2-13, cancels DOE O 425.1D.

2010-04-16T23:59:59.000Z

276

Honeywell modular automation system acceptance test report  

SciTech Connect (OSTI)

This document provides the results of the Acceptance Test Procedure for the Honeywell Modular Automation System.

Cunningham, L.T., Westinghouse Hanford

1996-06-14T23:59:59.000Z

277

Automated Morphology Analysis of Nanoparticles  

E-Print Network [OSTI]

of this dissertation is to develop automated morphology analysis methods. Morphology analysis is comprised of three tasks: separate individual particles from an agglomerate of overlapping nano-objects (image segmentation); infer the particle's missing contours (shape...

Park, Chiwoo

2012-10-19T23:59:59.000Z

278

Aspects of automation mode confusion  

E-Print Network [OSTI]

Complex systems such as commercial aircraft are difficult for operators to manage. Designers, intending to simplify the interface between the operator and the system, have introduced automation to assist the operator. In ...

Wheeler, Paul H. (Paul Harrison)

2007-01-01T23:59:59.000Z

279

Technology modernization assessment flexible automation  

SciTech Connect (OSTI)

The objectives of this report are: to present technology assessment guidelines to be considered in conjunction with defense regulations before an automation project is developed to give examples showing how assessment guidelines may be applied to a current project to present several potential areas where automation might be applied successfully in the depot system. Depots perform primarily repair and remanufacturing operations, with limited small batch manufacturing runs. While certain activities (such as Management Information Systems and warehousing) are directly applicable to either environment, the majority of applications will require combining existing and emerging technologies in different ways, with the special needs of depot remanufacturing environment. Industry generally enjoys the ability to make revisions to its product lines seasonally, followed by batch runs of thousands or more. Depot batch runs are in the tens, at best the hundreds, of parts with a potential for large variation in product mix; reconfiguration may be required on a week-to-week basis. This need for a higher degree of flexibility suggests a higher level of operator interaction, and, in turn, control systems that go beyond the state of the art for less flexible automation and industry in general. This report investigates the benefits and barriers to automation and concludes that, while significant benefits do exist for automation, depots must be prepared to carefully investigate the technical feasibility of each opportunity and the life-cycle costs associated with implementation. Implementation is suggested in two ways: (1) develop an implementation plan for automation technologies based on results of small demonstration automation projects; (2) use phased implementation for both these and later stage automation projects to allow major technical and administrative risk issues to be addressed. 10 refs., 2 figs., 2 tabs. (JF)

Bennett, D.W.; Boyd, D.R.; Hansen, N.H.; Hansen, M.A.; Yount, J.A.

1990-12-01T23:59:59.000Z

280

The 'Problem' with Automation: Inappropriate Feedback and Interaction, not 'Over-Automation'  

Science Journals Connector (OSTI)

12 April 1990 research-article The 'Problem' with Automation: Inappropriate Feedback and Interaction, not 'Over-Automation' D. A. Norman As automation increasingly takes its place in industry, especially high risk industry...

1990-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Type of automation failure: the effects on trust and reliance in automation.  

E-Print Network [OSTI]

??Past automation research has focused primarily on machine-related factors (e.g., automation reliability) and human-related factors (e.g., accountability). Other machine-related factors such as type of automation (more)

Johnson, Jason D.

2004-01-01T23:59:59.000Z

282

Participation through Automation: Fully Automated Critical Peak Pricing in Commercial Buildings  

E-Print Network [OSTI]

Figure 2. Demand Response Automation Server and BuildingII system to notify the Automation Server of an up comingoccurs day-ahead). 2. The Automation Server posts two pieces

Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Kiliccote, Sila; Linkugel, Eric

2006-01-01T23:59:59.000Z

283

Open Automated Demand Response for Small Commerical Buildings  

E-Print Network [OSTI]

ofFullyAutomatedDemand ResponseinLargeFacilities. FullyAutomatedDemandResponseTestsinLargeFacilities. OpenAutomated DemandResponseCommunicationStandards:

Dudley, June Han

2009-01-01T23:59:59.000Z

284

Scenarios for Consuming Standardized Automated Demand Response Signals  

E-Print Network [OSTI]

of Fully Automated Demand Response in Large Facilities.Fully Automated Demand Response Tests in Large Facilities.Interoperable Automated Demand Response Infrastructure.

Koch, Ed

2009-01-01T23:59:59.000Z

285

Automation World Features New White Paper on Wireless Security...  

Broader source: Energy.gov (indexed) [DOE]

Automation World Features New White Paper on Wireless Security Automation World Features New White Paper on Wireless Security The April 2009 issue of Automation World magazine...

286

Mexico-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Mexico-The World Bank Partnership for Market Readiness (PMR) Mexico-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Mexico-The World Bank Partnership for Market Readiness (PMR) Name Mexico-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

287

Colombia-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

Colombia-The World Bank Partnership for Market Readiness (PMR) Colombia-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Colombia-The World Bank Partnership for Market Readiness (PMR) Name Colombia-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

288

Brazil-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Brazil-The World Bank Partnership for Market Readiness (PMR) Brazil-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Brazil-The World Bank Partnership for Market Readiness (PMR) Name Brazil-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

289

Thailand-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

Thailand-The World Bank Partnership for Market Readiness (PMR) Thailand-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Thailand-The World Bank Partnership for Market Readiness (PMR) Name Thailand-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

290

China-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

China-The World Bank Partnership for Market Readiness (PMR) China-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: China-The World Bank Partnership for Market Readiness (PMR) Name China-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

291

India-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

India-The World Bank Partnership for Market Readiness (PMR) India-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: India-The World Bank Partnership for Market Readiness (PMR) Name India-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

292

Ukraine-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Ukraine-The World Bank Partnership for Market Readiness (PMR) Ukraine-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Ukraine-The World Bank Partnership for Market Readiness (PMR) Name Ukraine-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

293

Chile-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Chile-The World Bank Partnership for Market Readiness (PMR) Chile-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Chile-The World Bank Partnership for Market Readiness (PMR) Name Chile-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

294

Vietnam-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Vietnam-The World Bank Partnership for Market Readiness (PMR) Vietnam-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Vietnam-The World Bank Partnership for Market Readiness (PMR) Name Vietnam-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

295

Morocco-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Morocco-The World Bank Partnership for Market Readiness (PMR) Morocco-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Morocco-The World Bank Partnership for Market Readiness (PMR) Name Morocco-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

296

DOE Zero Energy Ready Home: Better Business for Builders Webinar Transcript  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, DOE Zero Energy Ready Home: Better Business for Builders, presented in August 2014.

297

Marketing and Sales Solutions for Zero Energy Ready Homes Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, Marketing and Sales Solutions for Zero Energy Ready Homes, presented in June 2014.

298

DOE Zero Energy Ready Home Low Load High Efficiency HVAC Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the DOE Zero Energy Ready Home webinar, Low Load High Efficiency HVAC, presented in May 2014.

299

DOE Zero Energy Ready Home Case Study, Ferguson Design and Constructio...  

Energy Savers [EERE]

Home Case Study, Ferguson Design and Construction, Inc., Sagaponak, NY, Custom Home DOE Zero Energy Ready Home Case Study, Ferguson Design and Construction, Inc., Sagaponak, NY,...

300

Sales and Value Recognition for Zero Energy Ready Home Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, Sales and Value Recognition for Zero Energy Ready Home, presented in December 2014.

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

DOE Zero Energy Ready Home Case Study: Habitat for Humanity South...  

Energy Savers [EERE]

Home Case Study, Manatee County Habitat for Humanity, Ellenton, FL, Affordable DOE Zero Energy Ready Home Case Study: Southeast Volusia Habitat for Humanity, Edgewater, FL...

302

Energy-- and Water-- Efficiency in the DOE Zero Energy Ready Home Program Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, Energy -- and Water -- Efficiency in the DOE Zero Energy Ready Home Program, presented in October 2014.

303

Jordan-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Jordan-The World Bank Partnership for Market Readiness (PMR) Jordan-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Jordan-The World Bank Partnership for Market Readiness (PMR) Name Jordan-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

304

Indonesia-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

Indonesia-The World Bank Partnership for Market Readiness (PMR) Indonesia-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Indonesia-The World Bank Partnership for Market Readiness (PMR) Name Indonesia-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

305

Turkey-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Turkey-The World Bank Partnership for Market Readiness (PMR) Turkey-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Turkey-The World Bank Partnership for Market Readiness (PMR) Name Turkey-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

306

DOE Zero Energy Ready Home High-Performance Home Sales Training Part 1 Webinar-- Text Version  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar DOE Zero Energy Ready Home High-Performance Home Sales Training Part 1, presented in February 2015.

307

NCTCOG Solar Ready II Project: Clean Air Through Energy Efficiency  

E-Print Network [OSTI]

Clean Air Through Energy Efficiency November 20, 2014 NCTCOG Solar Ready II Project Lori Clark Principal Air Quality Planner ESL-KT-14-11-12 CATEE 2014: Clean Air Through Efficiency Conference, Dallas, Texas Nov. 18-20 U.S. Department of Energy Sun...Shot Initiative Rooftop Solar Challenge 2 ESL-KT-14-11-12 CATEE 2014: Clean Air Through Efficiency Conference, Dallas, Texas Nov. 18-20 U.S. Department of Energy (DOE) SunShot Initiative The U.S. Department of Energy SunShot Initiative is a collaborative national...

Clark,L.

2014-01-01T23:59:59.000Z

308

Disciplined agility for process control & automation ; Disciplined agility for process control and automation .  

E-Print Network [OSTI]

??Process automation vendors must consider agility as a basis to gain a competitive edge in innovation. Process Automation systems can impact the operating cost of (more)

Tibazarwa, Augustine

2009-01-01T23:59:59.000Z

309

Trust in automated systems the effect of automation level on trust calibration .  

E-Print Network [OSTI]

??Automated systems perform functions that were previously executed by a human. When using automation, the role of the human changes from operator to supervisor. For (more)

Walliser, James C.

2011-01-01T23:59:59.000Z

310

Final Report on HOLODEC 2 Technology Readiness Level  

SciTech Connect (OSTI)

During the period of this project, the Holographic Detector for Clouds 2 (HOLODEC 2) instrument has advanced from a laboratory-proven instrument with some initial field testing to a fully flight-tested instrument capable of providing useful cloud microphysics measurements. This can be summarized as 'Technology Readiness Level 8: Technology is proven to work - Actual technology completed and qualified through test and demonstration.' As part of this project, improvements and upgrades have been made to the optical system, the instrument power control system, the data acquisition computer, the instrument control software, the data reconstruction and analysis software, and some of the basic algorithms for estimating basic microphysical variables like droplet diameter. Near the end of the project, the instrument flew on several research flights as part of the IDEAS 2011 project, and a small sample of data from the project is included as an example. There is one caveat in the technology readiness level stated above: the upgrades to the instrument power system were made after the flight testing, so they are not fully field proven. We anticipate that there will be an opportunity to fly the instrument as part of the IDEAS project in fall 2012.

Shaw, RA; Spuler, SM; Beals, M; Black, N; Fugal, JP; Lu, L

2012-06-18T23:59:59.000Z

311

Chapter 8 - Automation and Monitoring  

Science Journals Connector (OSTI)

This chapter begins with the topic of process automation which has the intent of making repetitive tasks more consistent, faster, and cheaper. As part of this discussion, we talk about how to determine if a process should be automated, how to document the process in preparation for automation, and how to perform the actual automation. A variety of scripting languages can be used to perform process automation and general best practices for scripting these processes is discussed as well as some thoughts on how to choose the right scripting language for the job. The second part of the chapter is all about monitoring of enterprise applications. Key performance indicators (KPIs) that give insight into the enterprise applications performance over time as well as determining when to alert the enterprise applications administrator to potential problems within the application are discussed. Alerts are another important topic associated with enterprise application monitoring that is discussed including how to properly tune alerts through the selection of appropriate KPIs, retry counts, and retry intervals.

Jeremy Faircloth

2014-01-01T23:59:59.000Z

312

Memo of Readiness to Proceed with Phase 1 Privatization for the Tank Farm Contractor  

SciTech Connect (OSTI)

This Readiness to Proceed Memorandum provides the CH2M HILL Hanford Group, Inc. formal certification of readiness to proceed with provision of the waste feed and infrastructure to handle the products from the privatization contractor's waste processing plant. Summary information is included from the integrated scope-cost-schedule baseline, the analyses of the baseline, management systems, and systems reviews.

HONEYMAN, J.O.

2000-04-24T23:59:59.000Z

313

Evaluation of Organizational E-Government Readiness in the Public Sector  

Science Journals Connector (OSTI)

The purpose of this paper is to provide an integrated framework to evaluate organizational e-government readiness for government organizations. This framework is necessary as current ones ignore challenges that arise due to organizational transformation ... Keywords: E-Government, E-Readiness, Information and Communication Technologies ICTs, Organizational Adoption, Organizational Strategy

Ibrahim A. Alghamdi; Robert Goodwin; Giselle Rampersad

2013-04-01T23:59:59.000Z

314

The Effects of Structured Work Experience on the Work-Readiness Skills of Students with Disabilities  

E-Print Network [OSTI]

. The problem is the lack of intervention research demonstrating ways of implementing programs that are associated with acquisition of work-readiness skills. The purpose of this study was to investigate the effects of structured work experience on the work-readiness...

Pacha, Jacqueline K

2013-05-03T23:59:59.000Z

315

Automated Demand Response Opportunities in Wastewater Treatment Facilities  

E-Print Network [OSTI]

Interoperable Automated Demand Response Infrastructure,study of automated demand response in wastewater treatmentopportunities for demand response control strategies in

Thompson, Lisa

2008-01-01T23:59:59.000Z

316

Automation in image cytometry : continuous HCS and kinetic image cytometry  

E-Print Network [OSTI]

OF CALIFORNIA, SAN DIEGO Automation in Image Cytometry:xiv Abstract of Dissertation Automation in Image Cytometry:

Charlot, David J.

2012-01-01T23:59:59.000Z

317

Automation of Fluorous Solid-Phase Extraction for Parallel Synthesis  

Science Journals Connector (OSTI)

Automation of Fluorous Solid-Phase Extraction for Parallel Synthesis ... Cartridge conditioning, sample loading, elution, and rinsing are automated. ...

Wei Zhang; Yimin Lu

2006-10-17T23:59:59.000Z

318

Open Automated Demand Response for Small Commerical Buildings  

E-Print Network [OSTI]

communications. Automated Logic Model Vendor LoadTypeoftheHVAC. Automated Logic Model Vendor LoadType

Dudley, June Han

2009-01-01T23:59:59.000Z

319

Process Control and Automation: The Bagrit Vision  

Science Journals Connector (OSTI)

Automation, broadly defined as the computer-assisted control of industrial processes, covers a wide spectrum of applications. Here we need to narrow the spectrum somewhat, so as to focus on the word automation as...

Emeritus Professor Simon Lavington

2011-01-01T23:59:59.000Z

320

Microcomputer Applications in Power System Substation Automation  

Science Journals Connector (OSTI)

The object of this chapter is to describe power system applications of microcomputers, particularly in the area of power substation automation.The major functions required in substation automation are reviewed an...

C. T. Nguyen; R. Grondin; A. St-Jacques

1983-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Home Automation with ZigBee  

Science Journals Connector (OSTI)

This article discusses a topic of home automation, also called domotics, and provides an ... advantages provided by ZigBee wireless networking standard for home automation solutions. ZigBee protocol implementatio...

Maxim Osipov

2008-01-01T23:59:59.000Z

322

Disciplined agility for process control & automation  

E-Print Network [OSTI]

Process automation vendors must consider agility as a basis to gain a competitive edge in innovation. Process Automation systems can impact the operating cost of manufacturing equipment, the safe control of large quantities ...

Tibazarwa, Augustine

2009-01-01T23:59:59.000Z

323

Technical University of Denmark rsted DTU Automation  

E-Print Network [OSTI]

Technical University of Denmark ?rsted · DTU Automation Project: SICAM - SIngle Conversion stage based SICAM using an LC-network Petar Ljusev, MSc., Ph.D. student, ?rsted · DTU Automation e-mail: pl

324

Automated Operating Procedures for Transfer Limits  

E-Print Network [OSTI]

Automated Operating Procedures for Transfer Limits Final Project Report Power Systems Engineering · Illinois · Iowa State · Texas A&M · Washington State · Wisconsin Automated Operating Procedures

325

A Review of the World Bank Forest Carbon Partnership Facility Readiness  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » A Review of the World Bank Forest Carbon Partnership Facility Readiness Preparation Proposals Jump to: navigation, search Tool Summary Name: A Review of the World Bank Forest Carbon Partnership Facility Readiness Preparation Proposals Agency/Company /Organization: World Resources Institute Sector: Land Focus Area: Forestry Topics: Implementation, Policies/deployment programs Resource Type: Lessons learned/best practices Website: pdf.wri.org/working_papers/getting_ready_2010-07-13.pdf A Review of the World Bank Forest Carbon Partnership Facility Readiness Preparation Proposals Screenshot References: A Review of R-PP[1] This working paper is part of a series of regular updates reviewing the Readiness Preparation Proposals (R-PPs) submitted by REDD+ Country

326

Automated Resoning in Modal Logics 0 (GENERAL PURPOSE) AUTOMATED REASONING IN MODAL LOGICS  

E-Print Network [OSTI]

Automated Resoning in Modal Logics 0 (GENERAL PURPOSE) AUTOMATED REASONING IN MODAL LOGICS BRANDEN FITELSON Department of Philosophy San Jos�e State University & Automated Reasoning Group.wisc.edu/fitelson BF @ AR @ MCS @ ANL & Philosophy @ SJSU May 16, 2002 Automated Resoning in Modal Logics 1

Fitelson, Branden

327

Welcome to the Operation READY 2002 collection Flexible formats: print, CD-ROM, DVD video and Web  

E-Print Network [OSTI]

1 Welcome to the Operation READY 2002 collection Flexible formats: print, CD-ROM, DVD video and Web Op READY 2002 documents in PDF and Word Customize to meet local needs Versatile training tools CD-ROM

328

Automated Video-Based Fall Detection  

E-Print Network [OSTI]

home assistive monitoring uses technology such as sensors and cameras to aid live-alone aging persons, typically involving automation.

Edgcomb, Alex Daniel

2014-01-01T23:59:59.000Z

329

Mobile RNA is Poised and Ready | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Glass Does a Double-Take Glass Does a Double-Take Welcoming a New Family of Superconductors A Lensless X-ray Camera for Nanoscale Materials and Biological Specimens The Collagen Protein Viewed at Unprecedented Detail Assembling Nanoparticles the Easy DNA-Way Science Highlights Archives: 2013 | 2012 | 2011 | 2010 2009 | 2008 | 2007 | 2006 2005 | 2004 | 2003 | 2002 2001 | 2000 | 1998 | Subscribe to APS Science Highlights rss feed Mobile RNA is Poised and Ready APRIL 10, 2008 Bookmark and Share Ribbon representation of the group II splicing intron. To see a 360° rotation of the recently solved O. iheyensis IIC intron crystal structure, click here (credit: Kevin Keating). A new picture of a genetic parasite isolated from a deep-sea bacterium is helping researchers see how certain specialized segments of RNA escape from

330

Technical Report TRARP1695 Automated Reasoning Project  

E-Print Network [OSTI]

Technical Report TR­ARP­16­95 Automated Reasoning Project Research School of Information Sciences Heuerding Automated Institute for Applied Mathematics Reasoning Project and Computer Science ANU University that contains automated proof procedures based on modal Gentzen systems for numerous propositional (nonclassical

Goré, Rajeev

331

AUTOMATED CRITICAL PEAK PRICING FIELD TESTS  

E-Print Network [OSTI]

AUTOMATED CRITICAL PEAK PRICING FIELD TESTS: 2006 PROGRAM DESCRIPTION AND RESULTS) for development of the DR Automation Server System This project could not have been completed without extensive: Greg Watson and Mark Lott · C&C Building Automation: Mark Johnson and John Fiegel · Chabot Space

332

INTEGRATING AUTOMATION DESIGN INFORMATION WITH XML  

E-Print Network [OSTI]

INTEGRATING AUTOMATION DESIGN INFORMATION WITH XML Mika Viinikkala, Seppo Kuikka Institute of Automation and Control, Tampere University of Technology, P.O. Box 692, 33101 Tampere, Finland Email: mika.viinikkala@tut.fi, seppo.kuikka@tut.fi Keywords: Systems integration, XML, automation design Abstract: This paper presents

333

A DISTRIBUTED AUTOMATION SYSTEM FOR ELECTROPHYSICAL INSTALLATIONS  

E-Print Network [OSTI]

A DISTRIBUTED AUTOMATION SYSTEM FOR ELECTROPHYSICAL INSTALLATIONS V.R. Kozak Budker Institute There was designed a set of devices for automation systems of physical installations. On this basis approach. KEY WORDS Automation, systems, applications, CANBUS, embedded, controller. 1. Introduction Budker

Kozak, Victor R.

334

TAMPERE UNIVERSITY OF TECHNOLOGY DEPARTMENT OF AUTOMATION  

E-Print Network [OSTI]

TAMPERE UNIVERSITY OF TECHNOLOGY DEPARTMENT OF AUTOMATION An Intelligent Web Service for Operation 2004 Examiner: Prof. Seppo Kuikka #12;2 Abstract TAMPERE UNIVERSITY OF TECHNOLOGY Automation Degree Program Institute of Automation and Control Jaakkola, Veli-Pekka: An Intelligent Web Service for Operation

335

Automating Shallow Seismic Imaging  

SciTech Connect (OSTI)

This seven-year, shallow-seismic reflection research project had the aim of improving geophysical imaging of possible contaminant flow paths. Thousands of chemically contaminated sites exist in the United States, including at least 3,700 at Department of Energy (DOE) facilities. Imaging technologies such as shallow seismic reflection (SSR) and ground-penetrating radar (GPR) sometimes are capable of identifying geologic conditions that might indicate preferential contaminant-flow paths. Historically, SSR has been used very little at depths shallower than 30 m, and even more rarely at depths of 10 m or less. Conversely, GPR is rarely useful at depths greater than 10 m, especially in areas where clay or other electrically conductive materials are present near the surface. Efforts to image the cone of depression around a pumping well using seismic methods were only partially successful (for complete references of all research results, see the full Final Technical Report, DOE/ER/14826-F), but peripheral results included development of SSR methods for depths shallower than one meter, a depth range that had not been achieved before. Imaging at such shallow depths, however, requires geophone intervals of the order of 10 cm or less, which makes such surveys very expensive in terms of human time and effort. We also showed that SSR and GPR could be used in a complementary fashion to image the same volume of earth at very shallow depths. The primary research focus of the second three-year period of funding was to develop and demonstrate an automated method of conducting two-dimensional (2D) shallow-seismic surveys with the goal of saving time, effort, and money. Tests involving the second generation of the hydraulic geophone-planting device dubbed the ''Autojuggie'' showed that large numbers of geophones can be placed quickly and automatically and can acquire high-quality data, although not under rough topographic conditions. In some easy-access environments, this device could make SSR surveying considerably more efficient and less expensive, particularly when geophone intervals of 25 cm or less are required. The most recent research analyzed the difference in seismic response of the geophones with variable geophone spike length and geophones attached to various steel media. Experiments investigated the azimuthal dependence of the quality of data relative to the orientation of the rigidly attached geophones. Other experiments designed to test the hypothesis that the data are being amplified in much the same way that an organ pipe amplifies sound have so far proved inconclusive. Taken together, the positive results show that SSR imaging within a few meters of the earth's surface is possible if the geology is suitable, that SSR imaging can complement GPR imaging, and that SSR imaging could be made significantly more cost effective, at least in areas where the topography and the geology are favorable. Increased knowledge of the Earth's shallow subsurface through non-intrusive techniques is of potential benefit to management of DOE facilities. Among the most significant problems facing hydrologists today is the delineation of preferential permeability paths in sufficient detail to make a quantitative analysis possible. Aquifer systems dominated by fracture flow have a reputation of being particularly difficult to characterize and model. At chemically contaminated sites, including U.S. Department of Energy (DOE) facilities and others at Department of Defense (DOD) installations worldwide, establishing the spatial extent of the contamination, along with the fate of the contaminants and their transport-flow directions, is essential to the development of effective cleanup strategies. Detailed characterization of the shallow subsurface is important not only in environmental, groundwater, and geotechnical engineering applications, but also in neotectonics, mining geology, and the analysis of petroleum reservoir analogs. Near-surface seismology is in the vanguard of non-intrusive approaches to increase knowledge of the shallow subsurface; our

Steeples, Don W.

2004-12-09T23:59:59.000Z

336

Chapter 13 - Commercial Building Automation  

Science Journals Connector (OSTI)

A Building Automation System (BAS) is a computerized, intelligent system that controls and measures lighting, climate, security, and other mechanical and electrical systems in a building. The purpose of a BAS is typically to reduce energy and maintenance costs, as well as to increase control, comfort, reliability, and ease of use for maintenance staff and tenants.

Jan Hller; Vlasios Tsiatsis; Catherine Mulligan; Stamatis Karnouskos; Stefan Avesand; David Boyle

2014-01-01T23:59:59.000Z

337

Automated computation meets hot QCD  

E-Print Network [OSTI]

We give a short review on recent progress in the field of automated calculations in finite-temperature field theory, where integration-by-parts techniques have proven (almost) as useful as in the zero-temperature case. Furthermore, we provide one concrete example of an evaluation of a new three-loop master sum-integral that exhibits maximal divergence.

Ioan Ghisoiu; York Schroder

2012-10-19T23:59:59.000Z

338

ALMS: Automated logic mapping system  

Science Journals Connector (OSTI)

ALMS is a set of design automation computer programs which accepts as input a description of a logic design, specifications of modules (e.g., chips, cards, etc.) into which the blocks of the design are to be partitioned or mapped, and some constraints ...

R. L. Russo; P. K. Wolff, Sr.

1971-06-01T23:59:59.000Z

339

Rockwell Automation - Owens Corning Teaming Profile  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Rockwell Automation Owens Corning Rockwell Automation Owens Corning 1201 S. Second Street 247 York Road Milwaukee, WI 53204 Guelph, Ontario N1E 3G4 Business: Industrial Automation Business: Textile / Fiber Nigel Hitchings Frank Peel Marketing Manager Electrical Support Specialist Phone: 508-357-8404 Phone: 519-823-7208 Email: nehitchings@ra.rockwell.com Email: frank.peel@owenscorning.com Owens Corning partners with Rockwell Automation to retrofit fans with VFDs, saving $67,000 annually Project Scope Owens Corning and Rockwell Automation installed Variable Frequency Drives (VFDs) on one 125HP cooling fan and three 40HP recirculation fans at the Owens Corning Guelph Glass Plant. The VFDs were integrated with the existing Rockwell Automation programmable automation controller to collect

340

Small Column Ion Exchange at Savannah River Site Technology Readiness Assessment Report  

Broader source: Energy.gov (indexed) [DOE]

Small Column Ion Exchange Technology at Small Column Ion Exchange Technology at Savannah River Site U.S. Department of Energy Office of Environmental Management Office of Technology Innovation and Development Technology Readiness Assessment Report November 2011 U.S. DOE-EM Office of Technology Innovation and Development November 11, 2011 Small Column Ion Exchange Program Technology Readiness Assessment Page 2 of 112 This page intentionally left blank November 11, 2011 U.S. DOE-EM Office of Technology Innovation and Development Small Column Ion Exchange Program Technology Readiness Assessment Page 3 of 112 APPROVALS ________________________ _ Harry D. Harmon Date

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Operational readiness review for the Waste Experimental Reduction Facility. Final report  

SciTech Connect (OSTI)

An Operational Readiness Review (ORR) at the Idaho National Engineering Laboratory`s (INEL`s) Waste Experimental Reduction Facility (WERF) was conducted by EG&G Idaho, Inc., to verify the readiness of WERF to resume operations following a shutdown and modification period of more than two years. It is the conclusion of the ORR Team that, pending satisfactory resolution of all pre-startup findings, WERF has achieved readiness to resume unrestricted operations within the approved safety basis. ORR appraisal forms are included in this report.

Not Available

1993-11-01T23:59:59.000Z

342

Specimen coordinate automated measuring machine/fiducial automated measuring machine  

SciTech Connect (OSTI)

The Specimen coordinate Automated Measuring Machine (SCAMM) and the Fiducial Automated Measuring Machine (FAMM) is a computer controlled metrology system capable of measuring length, width, and thickness, and of locating fiducial marks. SCAMM and FAMM have many similarities in their designs, and they can be converted from one to the other without taking them out of the hot cell. Both have means for: supporting a plurality of samples and a standard; controlling the movement of the samples in the +/- X and Y directions; determining the coordinates of the sample; compensating for temperature effects; and verifying the accuracy of the measurements and repeating as necessary. SCAMM and FAMM are designed to be used in hot cells.

Hedglen, Robert E. (Bethel Park, PA); Jacket, Howard S. (Pittsburgh, PA); Schwartz, Allan I. (Turtle Creek, PA)

1991-01-01T23:59:59.000Z

343

Green Button Sample Data from NSTAR (Monthly) | Department of...  

Office of Environmental Management (EM)

us an email at apps@hq.doe.gov. NSTARAnonymized.zip More Documents & Publications NIST Green Button Presentation ENERGY STAR Portfolio Manager and Utility Benchmarking Programs:...

344

Automated Export Control.PDF  

Broader source: Energy.gov (indexed) [DOE]

3 3 I N S P E C T I O N R E P O R T U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF INSPECTIONS INSPECTION OF THE DEPARTMENT OF ENERGY'S AUTOMATED EXPORT CONTROL SYSTEM DECEMBER 2001 U.S. DEPARTMENT OF ENERGY Washington, DC 20585 December 7, 2001 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman /s/ Inspector General SUBJECT: INFORMATION: Report on "Inspection of the Department of Energy's Automated Export Control System" BACKGROUND The National Defense Authorization Act for Fiscal Year 2000 (NDAA for FY 2000) contained a provision that not later than March 30 of each year the President will submit to Congress, beginning in the year 2000 and ending in the year 2007, an annual report on the Government's policies and procedures with respect to the export of technologies and technical information with

345

Automated Transportation Management System (ATMS)  

Broader source: Energy.gov (indexed) [DOE]

Re evised June 2010 Re evised June 2010 Autom The Depa Transport an integra system al outbound air. Its ea 1989 DOE significant operationa commerce electronic rates, pre transporta users eva shipments opportunit logistics im ATMS is i radioactiv shipments System ATMS is a activities p packaging including materials. common s lading, fre * W * C S * A * H * E * * O 0 mated T artment of Ene tation Manage ated web-base lowing users freight shipm arly developm E Inspector G t opportunitie al efficiency t e. Today's sy cally prepare s pare shipping ation bills befo aluate carrier s, and use co ties for system mprovements ts capability t ve and other h s in a comple Modules a modular sys performed by g and transpo radioactive a . Its modules shipment info eight bills, rate System Web Applic Carrier Eval Selection Automated

346

Convection automated logic oven control  

SciTech Connect (OSTI)

For the past few years, there has been a greater push to bring more automation to the cooling process. There have been attempts at automated cooking using a wide range of sensors and procedures, but with limited success. The authors have the answer to the automated cooking process; this patented technology is called Convection AutoLogic (CAL). The beauty of the technology is that it requires no extra hardware for the existing oven system. They use the existing temperature probe, whether it is an RTD, thermocouple, or thermistor. This means that the manufacturer does not have to be burdened with extra costs associated with automated cooking in comparison to standard ovens. The only change to the oven is the program in the central processing unit (CPU) on the board. As for its operation, when the user places the food into the oven, he or she is required to select a category (e.g., beef, poultry, or casseroles) and then simply press the start button. The CAL program then begins its cooking program. It first looks at the ambient oven temperature to see if it is a cold, warm, or hot start. CAL stores this data and then begins to look at the food`s thermal footprint. After CAL has properly detected this thermal footprint, it can calculate the time and temperature at which the food needs to be cooked. CAL then sets up these factors for the cooking stage of the program and, when the food has finished cooking, the oven is turned off automatically. The total time for this entire process is the same as the standard cooking time the user would normally set. The CAL program can also compensate for varying line voltages and detect when the oven door is opened. With all of these varying factors being monitored, CAL can produce a perfectly cooked item with minimal user input.

Boyer, M.A.; Eke, K.I. [Apollo U.S.A. Inc., Orlando, FL (United States)] [Apollo U.S.A. Inc., Orlando, FL (United States)

1998-03-01T23:59:59.000Z

347

South Africa-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

South Africa-The World Bank Partnership for Market Readiness (PMR) South Africa-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: South Africa-The World Bank Partnership for Market Readiness (PMR) Name South Africa-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

348

Costa Rica-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

Costa Rica-The World Bank Partnership for Market Readiness (PMR) Costa Rica-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Costa Rica-The World Bank Partnership for Market Readiness (PMR) Name Costa Rica-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

349

Order Module--DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR  

Broader source: Energy.gov (indexed) [DOE]

DOE O 425.1D, VERIFICATION OF READINESS TO START UP DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES Order Module--DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES "The familiar level of this module is divided into three sections. In the first section we will discuss the purpose of DOE O 425.1D and the requirements for 1) determining the level of readiness review (RR), 2) determining the startup authorization authority (SAA), and 3) the startup notification report. In the second section we will discuss 1) the requirements applicable to DOE ORRs and DOE RAs, and 2) the core requirements. In the third section we will discuss the 1) requirements for DOE field element and headquarters line management oversight of the startup or restart process, 2) requirements for the records management program, and

350

Zero Energy-Ready Single-Family Homes- Building America Top Innovation  

Broader source: Energy.gov [DOE]

Many Building America teams (ARBI, BA-PIRC, BSC, CARB, IBACOS, NorthernSTAR, PHI, etc.) have worked with home builders to design and test zero-energy-ready homes.

351

Building America Top Innovations 2013 Profile Zero Energy-Ready Single-Family Homes  

Broader source: Energy.gov [DOE]

Many Building America teams (ARBI, BA-PIRC, BSC, CARB, IBACOS, NorthernSTAR, PHI, etc.) have worked with home builders to design and test zero-energy-ready homes.

352

DOE Zero Energy Ready Home Case Study: BPC Green Builders, Danbury, CT  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Danbury, CT, that scored HERS 35 without PV. This 2-story, 1,650-ft2 cabin built by a custom home builder for his own family meets Passive House...

353

DOE Zero Energy Ready Home Case Study, Clifton View Homes, Coupeville...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Study, Clifton View Homes, Coupeville, WA, Systems Home DOE Zero Energy Ready Home Case Study, Clifton View Homes, Coupeville, WA, Systems Home Case-study of a DOE Zero Energy...

354

DOE Zero Energy Ready Home Case Study: Palo Duro Homes, Albuquerque...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Study: Palo Duro Homes, Albuquerque, NM DOE Zero Energy Ready Home Case Study: Palo Duro Homes, Albuquerque, NM Case study of a New Mexico-based home builder who has built more DOE...

355

DOE Zero Energy Ready Home Case Study, Palo Duro Homes, Inc....  

Energy Savers [EERE]

Study, Palo Duro Homes, Inc., Albuquerque, NM, Production DOE Zero Energy Ready Home Case Study, Palo Duro Homes, Inc., Albuquerque, NM, Production Case study of a DOE Zero Energy...

356

DOE Zero Energy Ready Home Case Study: Palo Duro Homes, Albuquerque, NM  

Broader source: Energy.gov [DOE]

Case study of a New Mexico-based home builder who has built more DOE Zero Energy Ready certified homes than any builder in the nation. One example home achieved a HERS score of HERS 55 without PV...

357

DOE Zero Energy Ready Home Case Study: Southern Homes, Russellville, AL  

Broader source: Energy.gov [DOE]

Case study of the first manufactured home built to the DOE Zero Energy Ready Home standard. This manufactured home achieved a HERS score of 57 without PV. The home has been set up for side-by-side...

358

DOE Zero Energy Ready Home Case Study 2014: Boulder ZED Design...  

Energy Savers [EERE]

Savings: with PV -292.9 MMBtu DOE ZERO ENERGY READY HOME Boulder ZED Design Build 2 polyethylene vapor barrier, then spray foams the foundation walls with 3 inches of open-cell...

359

DOE Zero Energy Ready Home Case Study: One Sky Homes, San Jose, CA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in San Jose, CA, that achieved a HERS 69 on the California HERS score without PV, or HERS -1 with 6.4 kW of PV.

360

Building America Zero Energy Ready Home Case Study: Imery Group, Proud Green Home, Serenbe GA  

Broader source: Energy.gov [DOE]

Case study describing the first DOE-certified zero energy ready home in Georgia, featuring 2x6 advanced framed wall, spray foamed walls and attic plus rigid foam and coated OSB.

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Focus Series: Program Finds Community Readiness Is the Key to More Retrofits  

Broader source: Energy.gov [DOE]

Focus Series: Program Finds Community Readiness Is the Key to More Retrofits, a document posted by the U.S. Department of Energys (DOES) Better Buildings Neighborhood Program.

362

Predicting School Readiness for Low-Income Children With Disability Risks Identified Early.  

E-Print Network [OSTI]

This study examined school readiness at kindergarten entry for low-income children whose disability indicators were identified before age 3. Data were collected as part ofthe Early Head Start Research and Evaluation ...

Jeon, Hyun-Joo; Peterson, Carla A.; Wall, Shavaun; Carta, Judith J.; Gayle, Luze; Eshbaugh, Elaine M.; Swanson, Mark

2011-01-01T23:59:59.000Z

363

DOE Zero Energy Ready Home Case Study: TC Legend Homes, Bellingham, WA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Bellingham, WA, that achieves HERS 43 without PV or HERS 13 with 3.2 kW of PV.

364

DOE Zero Energy Ready Home Case Study: Promethean Homes, Charlottesville, VA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Charlottesville, VA, that achieves a HERS 33 without PV. The 2,572-ft2 custom home with daylight basement, has 2x6 advanced framed walls filled with R...

365

A FAST WAVELET-BASED VIDEO CODEC AND ITS APPLICATION IN AN IP VERSION 6-READY  

E-Print Network [OSTI]

,mpalkow,schmidt,mw]@fhtw-berlin.de D. MARPE Fraunhofer-Institut für Nachrichtentechnik HHI Image Processing Department Einsteinufer 37 (MCU). It is equipped with an innovative addressing system for locating mobile users and ready for next

Marpe, Detlev

366

L1:PAC.P6.04 Westinghouse Test Stand Technical Readiness Review  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PAC.P6.04 Westinghouse Test Stand Technical Readiness Review Andrew Godfrey ORNL Completed: June 25, 2013 CASL- -2013-01 -000 Consortium for Advanced Simulation of LWRs Consortium...

367

DOE Zero Energy Ready Home Case Study: Southern Energy Homes, Russellville, AL  

Broader source: Energy.gov [DOE]

Case study of the first manufactured home built to the DOE Zero Energy Ready Home standard. This manufactured home achieved a HERS score of 57 without PV. The home has been set up for side-by-side...

368

Application of the cumulative risk model in predicting school readiness in Head Start children  

E-Print Network [OSTI]

This study investigates the degree to which the cumulative risk index predicted school readiness in a Head Start population. In general, the reviewed studies indicated the cumulative risk model was efficacious in predicting adverse developmental...

Rodriguez-Escobar, Olga Lydia

2009-05-15T23:59:59.000Z

369

ZERH Webinar: Sales and Value Recognition of Zero Energy Ready Homes  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy Zero Energy Ready Home (ZERH) Program represents a whole new level of home performance, with rigorous requirements that ensure outstanding levels of energy savings,...

370

ZERH Webinar: Energy- and Water- Efficiency in the DOE Zero Energy Ready Home Program  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy Zero Energy Ready Home (ZERH) Program represents a whole new level of home performance, with rigorous requirements that ensure outstanding levels of energy savings,...

371

DOE Zero Energy Ready Home Going Green and Building Strong: Building...  

Broader source: Energy.gov (indexed) [DOE]

2 Webinar (Text Version) DOE Zero Energy Ready Home Going Green and Building Strong: Building a FORTIFIED Home -- Part 2 Webinar (Text Version) Below is the text version of the...

372

DOE Zero Energy Ready Home Case Study, BPC Green Builders, Custom...  

Broader source: Energy.gov (indexed) [DOE]

Study, BPC Green Builders, Custom Home, New Fairfield, CT DOE Zero Energy Ready Home Case Study, BPC Green Builders, Custom Home, New Fairfield, CT Case study of a DOE Zero Energy...

373

DOE Zero Energy Ready Home Going Green and Building Strong: Building...  

Broader source: Energy.gov (indexed) [DOE]

1 Webinar (Text Version) DOE Zero Energy Ready Home Going Green and Building Strong: Building a FORTIFIED Home -- Part 1 Webinar (Text Version) Below is the text version of the...

374

DOE ZERH Webinar: Technical Resources for Marketing and Selling Zero Energy Ready Homes  

Broader source: Energy.gov [DOE]

Plan review energy modeling field inspections certificationdone! Right? If only it were that simple to successfully transition to Zero Energy Ready Homes. The reality is that theres a lot...

375

The Sandia MEMS Passive Shock Sensor : FY08 testing for functionality, model validation, and technology readiness.  

SciTech Connect (OSTI)

This report summarizes the functional, model validation, and technology readiness testing of the Sandia MEMS Passive Shock Sensor in FY08. Functional testing of a large number of revision 4 parts showed robust and consistent performance. Model validation testing helped tune the models to match data well and identified several areas for future investigation related to high frequency sensitivity and thermal effects. Finally, technology readiness testing demonstrated the integrated elements of the sensor under realistic environments.

Walraven, Jeremy Allen; Blecke, Jill; Baker, Michael Sean; Clemens, Rebecca C.; Mitchell, John Anthony; Brake, Matthew Robert; Epp, David S.; Wittwer, Jonathan W.

2008-10-01T23:59:59.000Z

376

Effects of Parent Expectations and Involvement on the School Readiness of Children in Head Start  

E-Print Network [OSTI]

of children enrolled in Head Start. The study examined how these iv parent variables were related to children?s school readiness, and differences between ethnic groups, gender groups, and level of risk. The study tested a model whereby the effect... experimental measures in addition to questionnaires adapted from standardized measures to assess parent behaviors. Standardized measures were administered to children to assess school readiness. Demographic information and level of risk were gathered using...

Cook, Krystal Tisha'

2010-10-12T23:59:59.000Z

377

Integration of automation design information using XML technologies  

E-Print Network [OSTI]

Integration of automation design information using XML technologies Master of Science Thesis Mika UNIVERSITY OF TECHNOLOGY DEPARTMENT OF AUTOMATION #12;2 Abstract TAMPERE UNIVERSITY OF TECHNOLOGY Automation Degree Program Institute of Automation and Control Viinikkala, Mika: Integration of automation design

378

Greenhouse gas emission reduction anticipating CO2 capture. How ready are you?  

Science Journals Connector (OSTI)

The Dutch Ministry of Spatial Planning and the Environment (VROM) engaged Jacobs Consultancy to develop a definition and measuring tool aimed at quantifying the CO2 Capture Readiness of a combustion plant. The tool developed tests the level and completeness of pre-project execution information. The testing of pre-project information is a standard practice in the refining and petrochemical industry and Jacobs Consultancy has adapted and tailored these practices to develop the Capture Readiness tool. The tool was developed in 2008 and was pilot tested on two already permitted coal fired power plant projects in 2009. The Capture Readiness tool is similar in concept to the well known Project Definition Rating Index originally introduced by the Construction Industry Institute for Major Capital Projects. The tool quantifies the readiness of a project to accommodate future CO2 capture and parallels the phased approached to Major Capital Projects used by the Project Definition Rating Index. A short introduction to the application of the PDRI methodology to test the completeness of the project development informationoften also referred to as Front End Loading or FEL, is included in this paper to establish the parallel approach we have used in the development of the Capture Readiness tool. The Jacobs Consultancy Capture Readiness tool is then discussed in more detail.

F.P.J.M. (Bas) Kerkhof; G. van Birgelen

2011-01-01T23:59:59.000Z

379

Definition: Distribution Automation Communications Network | Open Energy  

Open Energy Info (EERE)

Automation Communications Network Automation Communications Network Jump to: navigation, search Dictionary.png Distribution Automation Communications Network A communications network or networks designed to deliver control signals and information between distribution automation devices, and between these devices and utility grid control systems. These networks can utilize wired or wireless connections, and can be utility-owned or provided as services by a third party.[1] Related Terms distribution automation References ↑ https://www.smartgrid.gov/category/technology/distribution_automation_communications_network [[C LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ategory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from

380

Mobile home automation: merging mobile value added services and home automation technologies  

Science Journals Connector (OSTI)

In this paper we study mobile home automation, a field that emerges from an integration of mobile application platforms and home automation technologies. We motivate our research and provide ... options of how he...

Goetz Botterweck; J. Felix Hampe

2009-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Automated Surface Observing System: Standby Power Options  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Automated Automated Surface Observing System Standby Options Power Automated Surface Observing System (ASOS) General System Description * Self contained group of sensors and data gathering equipment that produces an automated weather observation * Weather observations support aviation, climate data, non government weather operations, public consumption, etc. * Initial deployment began in 1991 and continued through 1997 * Located at 884 sites nationwide, normally at airports * System has two distinct subsystems: Field installed equipment (DCP & Sensor Group) and an indoor processor (ACU) with peripherals * Separate facility power for DCP & Sensors and ACU 1 * measure and collect data * Located on the airport * back up group for 10 minutes * Currently pl

382

An Automated Raman Device for Gout Diagnosis  

Science Journals Connector (OSTI)

This study reports an automated Raman device to identify crystals in synovial aspirates from patients with gout symptoms. Combined with sample preparation, the device could diagnose...

Li, Bolan

383

Distributed Automated Demand Response - Energy Innovation Portal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Find More Like This Return to Search Distributed Automated Demand Response Lawrence Livermore National Laboratory Contact LLNL About This Technology...

384

Substation automation gains momentum with modern options  

SciTech Connect (OSTI)

This paper discusses issues associated with utility substation automation. Monitoring equipment for monitoring power flow, quality, and harmonics for three substations simultaneously is described.

Beaty, W.

1996-12-01T23:59:59.000Z

385

Automated Logic Restructuring with aSPFDs  

Science Journals Connector (OSTI)

This chapter presents a comprehensive methodology to automate logic restructuring in combinational and sequential circuits. This technique algorithmically constructs the required transformation by utilizing a ...

Yu-Shen Yang; Subarna Sinha; Andreas Veneris

2011-01-01T23:59:59.000Z

386

Automated Transportation Management System (ATMS) | Department...  

Office of Environmental Management (EM)

of Energy's (DOE's) Automated Transportation Management System is an integrated web-based logistics management system allowing users to manage inbound and outbound freight...

387

Recommendation 207 : Automate the Stewardship Verification Process...  

Office of Environmental Management (EM)

recommends exploring ways to automate the stewardship tracking process and establish a web-based solution for managing long-term stewardship information for the Oak Ridge...

388

Chapter 38, Design Automation for Microelectronics, Springer Handbook of Automation Deming Chen  

E-Print Network [OSTI]

Chapter 38, Design Automation for Microelectronics, Springer Handbook of Automation Deming Chen of hardware and software systems in the past several decades. CAD techniques are the key driving forces behind techniques. In this chapter we will introduce the fundamentals of design automation as an engineering field

Chen, Deming

389

Automating Logical Preservation for Small Institutions with Hoppla  

E-Print Network [OSTI]

Automating Logical Preservation for Small Institutions with Hoppla Stephan Strodl, Petar Petrov and outsources digital preservation expertise. This paper presents the automated logical preservation process of automating logical preservation by outsourcing expertise. 1 Introduction Digital information form essential

390

Automated Critical Peak Pricing Field Tests: 2006 Pilot Program Description and Results  

E-Print Network [OSTI]

Target Hayward Software client Automated Logic TargetAntioch Automated Logic Target Bakersfield Software client

Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila

2007-01-01T23:59:59.000Z

391

DOE Order Self Study Modules - DOE O 425.1D, Verification of Readiness to Startup or Restart Nuclear Facilities  

Broader source: Energy.gov (indexed) [DOE]

5.1D 5.1D VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES DOE O 425.1D Familiar Level June 2011 1 DOE O 425.1D VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources, you will be able to perform the following: 1. What is the purpose of DOE O 425.1D, Verification of Readiness to Startup or Restart Nuclear Facilities? 2. What are the requirements for determining the level of readiness review [operational readiness reviews (ORRs) and readiness assessments (RAs)]? 3. What are the requirements for determining the startup authorization authority? 4. What are the requirements for startup notification reports?

392

Open Automated Demand Response Communications Specification (Version 1.0)  

E-Print Network [OSTI]

and Techniques for Demand Response. May 2007. LBNL-59975.tofacilitateautomating demandresponseactionsattheInteroperable Automated Demand Response Infrastructure,

Piette, Mary Ann

2009-01-01T23:59:59.000Z

393

Open Automated Demand Response Dynamic Pricing Technologies and Demonstration  

E-Print Network [OSTI]

Goodin. 2009. Open Automated Demand Response Communicationsin Demand Response for Wholesale Ancillary Services. InOpen Automated Demand Response Demonstration Project. LBNL-

Ghatikar, Girish

2010-01-01T23:59:59.000Z

394

Home Automation : Smart home technology and template house design.  

E-Print Network [OSTI]

??In this thesis, home automations general knowledge, technology information and each component will be introduced to the reader in the first half of the whole (more)

Zheng, Zeya

2013-01-01T23:59:59.000Z

395

V-205: IBM Tivoli System Automation for Multiplatforms Java Multiple...  

Broader source: Energy.gov (indexed) [DOE]

5: IBM Tivoli System Automation for Multiplatforms Java Multiple Vulnerabilities V-205: IBM Tivoli System Automation for Multiplatforms Java Multiple Vulnerabilities July 29, 2013...

396

U-047: Siemens Automation License Manager Bugs Let Remote Users...  

Broader source: Energy.gov (indexed) [DOE]

7: Siemens Automation License Manager Bugs Let Remote Users Deny Service or Execute Arbitrary Code U-047: Siemens Automation License Manager Bugs Let Remote Users Deny Service or...

397

Appropriate automation of rail signalling systems: a human factors study.  

E-Print Network [OSTI]

??This thesis examines the effect of automation in the rail signalling environment. The level of automation in a system can be described as ranging along (more)

Balfe, Nora

2010-01-01T23:59:59.000Z

398

Automation of amperometric titrations with rotating platinum electrodes  

Science Journals Connector (OSTI)

Automation of amperometric titrations with rotating platinum electrodes ... A modification of an earlier described apparatus allows for the automation of amperometric titrations with rotating platinum electrodes. ...

Eugene D. Olsen; Roger D. Walton

1966-01-01T23:59:59.000Z

399

V-132: IBM Tivoli System Automation Application Manager Multiple...  

Energy Savers [EERE]

32: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities V-132: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities April 12, 2013 -...

400

ISA Approves Standard for Wireless Automation in Process Control...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ISA Approves Standard for Wireless Automation in Process Control Applications ISA Approves Standard for Wireless Automation in Process Control Applications On September 9, the...

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Small- and Medium-Size Building Automation and Control System...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Small- and Medium-Size Building Automation and Control System Needs: Scoping Study Small- and Medium-Size Building Automation and Control System Needs: Scoping Study Emerging...

402

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

81 - 1590 of 8,172 results. 81 - 1590 of 8,172 results. Download CX-003319: Categorical Exclusion Determination Recovery Act - National Aeronautics and Space Administration Solar Electric Propulsion Technology Application Readiness (NSTAR) Automated Meter Reading (AMR) -Based Dynamic Pricing CX(s) Applied: A1, A9, A11, B2.2, B5.1 Date: 07/30/2010 Location(s): Newton, Massachusetts Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory http://energy.gov/nepa/downloads/cx-003319-categorical-exclusion-determination Download CX-000378: Categorical Exclusion Determination Monitoring, Verification, and Analysis Feasibility Study (for Demonstration of Carbon Capture and Sequestration from Steam Methane Reforming Process Gas Used for Large-Scale Hydrogen Production)

403

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

31 - 5840 of 29,416 results. 31 - 5840 of 29,416 results. Download CX-005290: Categorical Exclusion Determination Propane Corridor Development Program CX(s) Applied: B5.1 Date: 02/23/2011 Location(s): Carroll County, Georgia Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory http://energy.gov/nepa/downloads/cx-005290-categorical-exclusion-determination Download CX-003319: Categorical Exclusion Determination Recovery Act - National Aeronautics and Space Administration Solar Electric Propulsion Technology Application Readiness (NSTAR) Automated Meter Reading (AMR) -Based Dynamic Pricing CX(s) Applied: A1, A9, A11, B2.2, B5.1 Date: 07/30/2010 Location(s): Newton, Massachusetts Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory

404

Categorical Exclusion Determinations: A1 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

30, 2010 30, 2010 CX-003318: Categorical Exclusion Determination Pacific Northwest Smart Grid Demonstration CX(s) Applied: A1, A9, A11, B1.7, B4.4, B5.1 Date: 07/30/2010 Location(s): Kennewick, Washington Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory July 30, 2010 CX-003501: Categorical Exclusion Determination Community-Wide Public Facilities Energy Efficiency Retrofit and Biomass Space Heating Conversion Project CX(s) Applied: A1, A9, A11, B5.1 Date: 07/30/2010 Location(s): Tanana, Alaska Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 30, 2010 CX-003319: Categorical Exclusion Determination Recovery Act - National Aeronautics and Space Administration Solar Electric Propulsion Technology Application Readiness (NSTAR) Automated Meter Reading

405

Demand Response and Open Automated Demand Response  

E-Print Network [OSTI]

LBNL-3047E Demand Response and Open Automated Demand Response Opportunities for Data Centers G described in this report was coordinated by the Demand Response Research Center and funded by the California. Demand Response and Open Automated Demand Response Opportunities for Data Centers. California Energy

406

Atlas Sodium Automated Batch Synthesis System  

E-Print Network [OSTI]

Atlas Sodium Automated Batch Synthesis System (Syrris) June 2013 #12;Introduction to the system · The Atlas Sodium system consists of an Atlas base equipped with a 400ºC hotplate, a stacking dry bath systemL) for automated addition and/or removal of solution. · The system is computer controlled by the Atlas software

Subramanian, Venkat

407

PeopleSoft HR ECR Automation Process  

E-Print Network [OSTI]

PeopleSoft HR ECR Automation Process Short Term Disability with Pay May 2011 #12;Processing a Short Term Disability with Pay ECR Search Page To process a Short Term Disability using the automated ECR process, follow the menu navigation below: Home > Employee Change Request (ECR) > Use > ECR Create

Huang, Jianyu

408

PeopleSoft HR ECR Automation Process  

E-Print Network [OSTI]

PeopleSoft HR ECR Automation Process Revise Existing SWB May 2011 #12;Processing a Short Work Break Date Revision ECR Search Page To process a Short Work Break Date revision using the automated ECR process, follow the menu navigation below: Home > Employee Change Request (ECR) > Use > ECR Create

Huang, Jianyu

409

PeopleSoft HR ECR Automation Process  

E-Print Network [OSTI]

PeopleSoft HR ECR Automation Process Long Term Disability May 2011 #12;Processing a Long Term Disability LTD ECR Search Page To process an LTD transaction using the automated ECR process, follow the menu navigation below: Home > Employee Change Request (ECR) > Use > ECR Create 2 · If you know the Name or Eagle

Huang, Jianyu

410

Technical University of Denmark rsted DTU Automation  

E-Print Network [OSTI]

Technical University of Denmark ?rsted · DTU Automation Project: SICAM - SIngle Conversion stage;Isolated PDM and PWM DC-AC SICAMs Petar Ljusev, MSc., Ph.D. student, ?rsted · DTU Automation e-mail: pl

411

D Riso-R-429 Automated Uranium  

E-Print Network [OSTI]

routinely used analytical techniques for uranium determina- tions in geological samples, fissionCM i D Riso-R-429 Automated Uranium Analysis by Delayed-Neutron Counting H. Kunzendorf, L. Løvborg AUTOMATED URANIUM ANALYSIS BY DELAYED-NEUTRON COUNTING H. Kunzendorf, L. Løvborg and E.M. Christiansen

412

Optimization of automation: I. Estimation method of cognitive automation rates reflecting the effects of automation on human operators in nuclear power plants  

Science Journals Connector (OSTI)

Abstract Since automation was introduced in various industrial fields, the concept of the automation rate has been used to indicate the inclusion proportion of automation among all work processes or facilities. Expressions of the inclusion proportion of automation are predictable, as is the ability to express the degree of the enhancement of human performance. However, many researchers have found that a high automation rate does not guarantee high performance. Therefore, to reflect the effects of automation on human performance, this paper proposes a new estimation method of the automation rate that considers the effects of automation on human operators in nuclear power plants (NPPs). Automation in \\{NPPs\\} can be divided into two types: system automation and cognitive automation. Some general descriptions and characteristics of each type of automation are provided, and the advantages of automation are investigated. The advantages of each type of automation are used as measures of the estimation method of the automation rate. One advantage was found to be a reduction in the number of tasks, and another was a reduction in human cognitive task loads. The system and the cognitive automation rate were proposed as quantitative measures by taking advantage of the aforementioned benefits. To quantify the required human cognitive task loads and thus suggest the cognitive automation rate, Conants information-theory-based model was applied. The validity of the suggested method, especially as regards the cognitive automation rate, was proven by conducting experiments. The result showed that a decreased rate of the operator working time was significantly related to the cognitive automation rate and that the calculation of the cognitive task load was useful as a measure of the cognitive automation rate.

Seung Min Lee; Jong Hyun Kim; Poong Hyun Seong

2014-01-01T23:59:59.000Z

413

Automation of hydroelectric power plants  

SciTech Connect (OSTI)

This paper describes how the author's company has been automating its hydroelectric generating plants. The early automations were achieved with a relay-type supervisory control system, relay logic, dc tachometer, and a pneumatic gate-position controller. While this system allowed the units to be started and stopped from a remote location, they were operated at an output that was preset by the pneumatic control at the generating site. The supervisory control system at the site provided such information as unit status, generator breaker status, and a binary coded decimal (BCD) value of the pond level. The generating units are started by energizing an on-site relay that sets the pneumatic gate controller to a preset value above the synchronous speed of the hydroelectric generator. The pneumatic controller then opens the water-wheel wicket gates to the preset startup position. As the hydroelectric generator starts to turn, the machine-mounted dc tachometer produces a voltage. At a dc voltage equivalent to synchronous speed, the generator main breaker closes, and a contact from the main breaker starts a field-delay timer. Within a few seconds, the field breaker closes. Once the cycle is complete, a relay changes the pneumatic setpoint to a preset operating point of about 8/10 wicket gate opening.

Grasser, H.S. (Consolidated Papers, Inc., Wisconsin Rapids, WI (US))

1990-03-01T23:59:59.000Z

414

DOE Zero Energy Ready Home: Ventilation and Filtration Strategies with Indoor airPLUS Webinar (Text Version)  

Broader source: Energy.gov [DOE]

Below is the text version of the webinar, DOE Zero Energy Ready Home: Ventilation and Filtration Strategies with Indoor airPLUS, presented in August 2014.

415

Solar Automation Inc | Open Energy Information  

Open Energy Info (EERE)

Inc Inc Jump to: navigation, search Name Solar Automation Inc Place Albuquerque, New Mexico Zip NM 8110 Product Produces manufacturing equipment for PV cells. References Solar Automation Inc[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Solar Automation Inc is a company located in Albuquerque, New Mexico . References ↑ "Solar Automation Inc" Retrieved from "http://en.openei.org/w/index.php?title=Solar_Automation_Inc&oldid=351247" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version Permanent link Browse properties About us Disclaimers Energy blogs Linked Data Developer services

416

Substation automation -- a ``bottoms up`` approach  

SciTech Connect (OSTI)

The proliferation of multi-purpose intelligent electronic devices in substations brought the availability of abundant and often overlapping data at the substation. This data can be used for improving the operation and maintenance of the substations and the entire power system. The objective of substation automation is to use technology to gather, consolidate and utilize this data for increasing the efficiency of power system operation and maintenance. Often automation functions are developed and offered around the capabilities of the preferred hardware and software of the integrator. Emphasis is placed on hardware, software and communication protocols rather than need, methodology and application. This can result in over-automation with complex, expensive and ineffective systems, or under-automation that fails to achieve the user`s objectives. The objective is to select appropriate hardware, software and methodology to build the most cost effective system to get the desired results. This paper describes steps to ensure the successful implementation of substation automation.

Thomas, J. [General Electric, Malvern, PA (United States)

1996-10-01T23:59:59.000Z

417

Dynamic Whitelist Generation for Automated Response  

Broader source: Energy.gov (indexed) [DOE]

Methodology Methodology Results Dynamic Whitelist Generation for Automated Response Chris Strasburg, Josh Adams Ames Laboratory, US DOE cstras@ameslab.gov, jadams@ameslab.gov The Ames Laboratory, US DOE 1 Dynamic Whitelist Generation for Automated Response Introduction Methodology Results Outline 1 Introduction About Ames Laboratory Motivation 2 Methodology Data Classifiers Experiments 3 Results The Ames Laboratory, US DOE 2 Dynamic Whitelist Generation for Automated Response Introduction Methodology Results About Ames Laboratory Motivation Ames Physical Environment The Ames Laboratory, US DOE 3 Dynamic Whitelist Generation for Automated Response Introduction Methodology Results About Ames Laboratory Motivation Ames Network Environment The Ames Laboratory, US DOE 4 Dynamic Whitelist Generation for Automated Response Introduction Methodology Results About Ames

418

Economic analysis under uncertainty of coal fired capture-ready power plants  

Science Journals Connector (OSTI)

This study assesses the feasibility of investing in capture ready (CR) coal-based power plants under uncertainty. It defines eighteen cases according to three routes for carbon capture (post, pre and oxy-combustion) and different levels of readiness. Due to the uncertain nature of the development of capture plants, this study applies a probabilistic analysis. Findings for the more likely scenario (median value) indicated that severe pre-investments in CR plants are the best choice only when the implementation of the capture occurs in the short term. In the long term, the investment decision favored the power plants not fully ready. Interestingly, under a less likely but possible scenario (the inferior limit of the probabilistic analysis) IGCC-Ready plants become the best option in the short term, and then oxy-combustion ready plants stand out. Hence, some policies such as those based on financing lowering the discount rate perceived by investors, and those based on fund to research and development, might create an investment environment favorable to CR plants.

Pedro R.R. Rochedo; Alexandre Szklo

2013-01-01T23:59:59.000Z

419

AUTOMATING GROUNDWATER SAMPLING AT HANFORD  

SciTech Connect (OSTI)

Until this past October, Fluor Hanford managed Hanford's integrated groundwater program for the U.S. Department of Energy (DOE). With the new contract awards at the Site, however, the CH2M HILL Plateau Remediation Company (CHPRC) has assumed responsibility for the groundwater-monitoring programs at the 586-square-mile reservation in southeastern Washington State. These programs are regulated by the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). The purpose of monitoring is to track existing groundwater contamination from past practices, as well as other potential contamination that might originate from RCRA treatment, storage, and disposal (TSD) facilities. An integral part of the groundwater-monitoring program involves taking samples of the groundwater and measuring the water levels in wells scattered across the site. More than 1,200 wells are sampled each year. Historically, field personnel or 'samplers' have been issued pre-printed forms that have information about the well(s) for a particular sampling evolution. This information is taken from the Hanford Well Information System (HWIS) and the Hanford Environmental Information System (HEIS)--official electronic databases. The samplers used these hardcopy forms to document the groundwater samples and well water-levels. After recording the entries in the field, the samplers turned the forms in at the end of the day and the collected information was posted onto a spreadsheet that was then printed and included in a log book. The log book was then used to make manual entries of the new information into the software application(s) for the HEIS and HWIS databases. This is a pilot project for automating this tedious process by providing an electronic tool for automating water-level measurements and groundwater field-sampling activities. The automation will eliminate the manual forms and associated data entry, improve the accuracy of the information recorded, and enhance the efficiency and sampling capacity of field personnel. The goal of the effort is to eliminate 100 percent of the manual input to the database(s) and replace the management of paperwork by the field and clerical personnel with an almost entirely electronic process. These activities will include the following: scheduling the activities of the field teams, electronically recording water-level measurements, electronically logging and filing Groundwater Sampling Reports (GSR), and transferring field forms into the site-wide Integrated Document Management System (IDMS).

CONNELL CW; HILDEBRAND RD; CONLEY SF; CUNNINGHAM DE

2009-01-16T23:59:59.000Z

420

DOE-STD-3006-95; DOE Standard Planning and Conduct of Operational Readiness Reviews (ORR)  

Broader source: Energy.gov (indexed) [DOE]

3006-95 3006-95 November 1995 SUPERSEDING DOE-STD-3006-93 November 1993 DOE STANDARD PLANNING AND CONDUCT OF OPERATIONAL READINESS REVIEWS (ORR) U.S. Department of Energy AREA MISC Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (615) 576-8401. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 487-4650. DOE-STD-3006-95 i PLANNING AND CONDUCT OF OPERATIONAL READINESS REVIEWS (ORR) FOREWORD 1. DOE 0 425.1 establishes the requirement to conduct Operational Readiness Reviews

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Ready, Set . . . Get Prepped for Monday's Launch of the 'America's Next  

Broader source: Energy.gov (indexed) [DOE]

Ready, Set . . . Get Prepped for Monday's Launch of the Ready, Set . . . Get Prepped for Monday's Launch of the 'America's Next Top Energy Innovator' Challenge Ready, Set . . . Get Prepped for Monday's Launch of the 'America's Next Top Energy Innovator' Challenge April 29, 2011 - 10:35am Addthis Ginny Simmons Ginny Simmons Former Managing Editor for Energy.gov, Office of Public Affairs The 'America's Next Top Energy Innovator' Challenge will begin on May 2. That means that starting on Monday, and continuing through December 15, entrepreneurs and start-up companies will be able to apply for any of the Department of Energy's 15,000 unlicensed patents at a greatly reduced cost and with much less paperwork. Since Secretary Chu announced the challenge at the end of March our phones have been ringing and our email inboxes have been piling up with questions

422

Get Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money |  

Broader source: Energy.gov (indexed) [DOE]

Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money Get Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money September 21, 2009 - 3:04pm Addthis Allison Casey Senior Communicator, NREL Tomorrow is the official first day of fall, and while I always mourn the end of summer, one of the best things about fall is leaf peeping! Last year, we took my father-in-law's red '57 T-bird convertible on a lovely drive through the mountains to see the bright yellow aspens. Something about a car like that draws lots of attention-honks, waves, questions. We basically made friends everywhere we went. As much fun as that was, it wasn't exactly the most fuel-efficient or environmentally friendly excursion. I know we can do better this year; beautiful leaves are less than an hour's

423

Getting Ready for Electric Drive: the Plug-In Vehicle and Infrastructure  

Broader source: Energy.gov (indexed) [DOE]

Ready for Electric Drive: the Plug-In Vehicle and Ready for Electric Drive: the Plug-In Vehicle and Infrastructure Workshop Getting Ready for Electric Drive: the Plug-In Vehicle and Infrastructure Workshop August 18, 2010 - 5:30pm Addthis Matt Rogers Matt Rogers McKinsey & Company Blogs have been abuzz on electric vehicles and advanced batteries recently, and likely in no small part due to some of the programs that are kicking into high gear at the Department of Energy right now. On July 22, we hosted a Plug-In Vehicle & Infrastructure Workshop that brought together nearly 200 attendees and 600 web participants to discuss near-term actions to accelerate deployment of electric-drive vehicles. The program demonstrated how federal leadership can speed up preparation for vehicles expected in showrooms at the end of this year. This leadership complements the Obama

424

Nek5000 Ready to Use after Simulations of Important Pipe Flow Benchmark |  

Broader source: Energy.gov (indexed) [DOE]

Nek5000 Ready to Use after Simulations of Important Pipe Flow Nek5000 Ready to Use after Simulations of Important Pipe Flow Benchmark Nek5000 Ready to Use after Simulations of Important Pipe Flow Benchmark January 29, 2013 - 1:42pm Addthis Velocity magnitude in MATiS-H spacer grid with swirl-type vanes. Velocity magnitude in MATiS-H spacer grid with swirl-type vanes. As part of the on-going Nek5000 validation efforts, a series of large eddy simulations (LES) have been performed for thermal stratification in a pipe. Results were in good agreement with the experiment and the simulation data has provided insight into the physics of the flow. An additional series of simulations of the OECD-NEA MATiS-H benchmark has also been completed using intermediate- fidelity modeling approaches, such as k-epsilon, k-omega shear stress transport, and ID detached eddy simulation, as well as one

425

The Ohio State University Readies for its Encore at the Solar Decathlon |  

Broader source: Energy.gov (indexed) [DOE]

The Ohio State University Readies for its Encore at the Solar The Ohio State University Readies for its Encore at the Solar Decathlon The Ohio State University Readies for its Encore at the Solar Decathlon April 15, 2011 - 5:03pm Addthis The Ohio State University displayed their design model at the International Builders' Show in Orlando, Florida from January 12-15, 2011. | Credit: All Commercial Photography/U.S. Department of Energy Solar Decathlon The Ohio State University displayed their design model at the International Builders' Show in Orlando, Florida from January 12-15, 2011. | Credit: All Commercial Photography/U.S. Department of Energy Solar Decathlon Erik Hyrkas Erik Hyrkas Media Relations Specialist, Office of Energy Efficiency & Renewable Energy How can I participate? The next Solar Decathlon will be held Sept. 23-Oct. 2, 2011, at

426

Automated cleaning of electronic components  

SciTech Connect (OSTI)

Environmental and operator safety concerns are leading to the elimination of trichloroethylene and chlorofluorocarbon solvents in cleaning processes that remove rosin flux, organic and inorganic contamination, and particulates from electronic components. Present processes depend heavily on these solvents for manual spray cleaning of small components and subassemblies. Use of alternative solvent systems can lead to longer processing times and reduced quality. Automated spray cleaning can improve the quality of the cleaning process, thus enabling the productive use of environmentally conscious materials, while minimizing personnel exposure to hazardous materials. We describe the development of a prototype robotic system for cleaning electronic components in a spray cleaning workcell. An important feature of the prototype system is the capability to generate the robot paths and motions automatically from the CAD models of the part to be cleaned, and to embed cleaning process knowledge into the automatically programmed operations.

Drotning, W.; Meirans, L.; Wapman, W.; Hwang, Y.; Koenig, L.; Petterson, B.

1994-07-01T23:59:59.000Z

427

ENERGY STAR Focus on Energy Efficiency in Ready Mix Concrete Manufacturing  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ready Mix Concrete Ready Mix Concrete Manufacturing Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In this section Get started with ENERGY STAR Make the business case Build an energy management program Measure, track, and benchmark Tools for benchmarking energy management practices Tools for tracking and benchmarking facility energy performance ENERGY STAR Energy Performance Indicators for plants

428

Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP)  

Broader source: Energy.gov (indexed) [DOE]

TECHNOLOGY READINESS ASSESSMENT TECHNOLOGY READINESS ASSESSMENT OF THE CALCINE DISPOSITION PROJECT VOLUME ONE Anthony F. Kluk Hoyt C. Johnson Clyde Phillip McGinnis Michael Rinker Steven L. Ross Herbert G. Sutter John Vienna February 2011 Prepared by the U.S. Department of Energy Washington, DC February 2011 ii This page intentionally left blank. Review of Calcine Disposition Project Self-Assessment of Technology Maturation iii SIGNATURES ____________________________________ ____________________________________ Anthony F. Kluk, Team Lead Date ____________________________________ ____________________________________ Hoyt C. Johnson Date ____________________________________ ____________________________________ Clyde Phillip McGinnis Date ____________________________________ ____________________________________

429

Analyses of Value-added for Case-ready Beef, with Special Emphasis on Texas.  

E-Print Network [OSTI]

beef at retail and increasing the value-added from beef at the packer /processor level. Adoption of case-ready packaging technology by the beef industry trans fers the function of retail cutting and packaging of fresh beef from the retail store... beef at retail and increasing the value-added from beef at the packer /processor level. Adoption of case-ready packaging technology by the beef industry trans fers the function of retail cutting and packaging of fresh beef from the retail store...

Dietrich, R.A.; Farris, D.E.; Ward, J.B

1992-01-01T23:59:59.000Z

430

A SIP-based Home Automation Platform: an Experimental Study  

E-Print Network [OSTI]

A SIP-based Home Automation Platform: an Experimental Study Benjamin Bertran, Charles Consel INRIA the requirements of home automation; we present the resulting architecture of a home automation system; and, we to tackle the challenges of the home automation domain. In this paper we present an approach and a platform

Boyer, Edmond

431

Fueling Robot Automates Hydrogen Hose Reliability Testing (Fact Sheet)  

SciTech Connect (OSTI)

Automated robot mimics fueling action to test hydrogen hoses for durability in real-world conditions.

Harrison, K.

2014-01-01T23:59:59.000Z

432

Automated Data Quality Analysis Research and Development  

E-Print Network [OSTI]

DOCUMENTATION 4.0 FUTURE DIRECTIONS 5.0 SUMMARY 6.0 CODE 1 2 3 5 5 12 17 17 18 February 2002, Final Report Energy Systems Laboratory, Texas A&M University p. 5 1.0 INTRODUCTION The Automated Data Quality process development is an effort to automate the analysis.... Automation of the "lower-level" data quality checking will enabled a more refined review process. Figure 1. Energy Core Polling and Reloading Process Diagram February 2002, Final Report Energy Systems Laboratory, Texas A&M University p. 6 2.2 Definitions...

Sweeney, J., Jr.; Haberl, J. S.

2002-01-01T23:59:59.000Z

433

j5 DNA Assembly Design Automation Software  

Science Journals Connector (OSTI)

j5 DNA Assembly Design Automation Software ... Here, we report the development and deployment of a web-based software tool, j5, which automates the design of scar-less multipart DNA assembly protocols including SLIC, Gibson, CPEC, and Golden Gate. ... The key innovations of the j5 design process include cost optimization, leveraging DNA synthesis when cost-effective to do so, the enforcement of design specification rules, hierarchical assembly strategies to mitigate likely assembly errors, and the instruction of manual or automated construction of scar-less combinatorial DNA libraries. ...

Nathan J. Hillson; Rafael D. Rosengarten; Jay D. Keasling

2011-12-07T23:59:59.000Z

434

Modular design for increasing assembly automation  

Science Journals Connector (OSTI)

Abstract Modular design can address the need for a high number of product variants and further allow a higher degree of automation in the assembly line. A framework is developed for the simultaneous modular product design and the design of automated manufacturing system. Product designs are optimized for automation using Design Structure Matrix and Modular Function Deployment. Alternative production systems are designed and accessed based on the analysis of assembly steps hierarchically. The implementation of the framework on the design of a production system for furniture assembly, able to handle multiple variants with a large number of components, is demonstrated.

Konstantinos Salonitis

2014-01-01T23:59:59.000Z

435

AUTOMATION IN THE MEAT INDUSTRY | Slaughter Line Operation  

Science Journals Connector (OSTI)

Abstract The strongest incentives for the slaughter industry to adopt automation technology relate to the drive for improved productivity through reduced labor. Automation in the pig slaughter industry has mainly been adopted in regions with high labor costs such as Northern Europe. In New Zealand, the lamb slaughter industry has been progressive in developing and using automation to automate the slaughter process. Automation in beef slaughter is limited because of the complexity associated with handling of the biological variation. Barriers for slaughter line automation include the high cost and complexity associated with the development of slaughter automation technology, combined with limited market size.

J.U. Nielsen; N.T. Madsen; R. Clarke

2014-01-01T23:59:59.000Z

436

Organizational readiness and the adoption of electronic business: the moderating role of national culture in 29 european countries  

Science Journals Connector (OSTI)

In this paper we explore the relationship between average organizational readiness and actual electronic business (e-business) adoption at a national level. Several researchers have provided empirical evidence suggesting that an organization's readiness ... Keywords: adoption, electronic business, europe, individualism, masculinity, national cultural effects, power distance, uncertainty avoidance

Tobias Kollmann*; Andreas Kuckertz; Nicola Breugst

2009-10-01T23:59:59.000Z

437

Level of Automation Effects on Situation Awareness and Functional Specificity in Automation Reliance.  

E-Print Network [OSTI]

??This thesis investigates the relationships between performance, workload, and situation awareness at varying levels of automation. The relationships observed in this study are compared to (more)

Smith, Adam

2012-01-01T23:59:59.000Z

438

Definition: Distribution Automation | Open Energy Information  

Open Energy Info (EERE)

Automation Automation Jump to: navigation, search Dictionary.png Distribution Automation DA is a family of technologies including sensors, processors, communication networks, and switches that can perform a number of distribution system functions depending on how they are implemented. Over the last 20 years, utilities have been applying DA to improve reliability, service quality and operational efficiency. More recently, DA is being applied to perform automatic switching, reactive power compensation coordination, or other feeder operations/control.[1] Related Terms sustainability, smart grid References ↑ https://www.smartgrid.gov/category/technology/distribution_automation [[Ca LikeLike UnlikeLike You and one other like this.One person likes this. Sign Up to see what your friends like.

439

Definition: Automated Distribution Circuit Switches | Open Energy  

Open Energy Info (EERE)

Circuit Switches Circuit Switches Jump to: navigation, search Dictionary.png Automated Distribution Circuit Switches Distribution circuit switches that can be operated automatically in response to control signals from local sensors, distribution automation systems, or grid control systems. Such switches can be installed as automated devices or existing equipment can be retrofitted with controls and communications. The degree of automation depends on the controls and communications system implemented. These switches can be opened or closed to isolate portions of a distribution circuit that has experienced a short circuit (fault), or must be taken out of service for maintenance or other operations. When used in combination, these switches can reroute power from other substations or nearby distribution circuits.[1]

440

LANL to certify automated influenza surveillance system  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LANL to certify automated influenza surveillance system LANL to certify automated influenza surveillance system LANL to certify automated influenza surveillance system A compact automated system for surveillance and screening of potential pandemic strains of influenza and other deadly infectious diseases is a step closer to reality. January 31, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Automated visual inspection of rolled metal surfaces  

Science Journals Connector (OSTI)

A prototype for an automated visual on-line metal strip inspection system is described. The system is capable of both detecting and classifying surface defects in copper alloy strips, and it has been installed...

Timo Piironen; Olli Silven; Matti Pietikinen

1990-01-01T23:59:59.000Z

442

Automated intrusion recovery for web applications  

E-Print Network [OSTI]

In this dissertation, we develop recovery techniques for web applications and demonstrate that automated recovery from intrusions and user mistakes is practical as well as effective. Web applications play a critical role ...

Chandra, Ramesh, Ph. D. Massachusetts Institute of Technology

2013-01-01T23:59:59.000Z

443

Preface: Cognitive Engineering in Automated Systems Design  

E-Print Network [OSTI]

Preface: Cognitive Engineering in Automated Systems Design This special issue was motivated by an apparent paucity of research on applications of cognitive engineering principles in the design of complex systems including mainte- nance, manufacturing, and transportation systems. Cognitive engineering

Kaber, David B.

444

Honeywell modular automation system computer software documentation  

SciTech Connect (OSTI)

This document provides a Computer Software Docuemntation for a new Honeywell Modular Automation System (MAS) being installed in the Plutonium Finishing Plant (PFP). This system will be used to control new thermal stabilization furnaces in HA-21I.

Cunningham, L.T.

1997-01-20T23:59:59.000Z

445

ZigBee Smart Home Automation Systems  

Science Journals Connector (OSTI)

This chapter summarizes a completed UK government funded project, the indeedNET ZigBee home automation system, which heralds a milestone in the ... energy saving devices with the potential to help home owners and...

Shuang-Hua Yang

2014-01-01T23:59:59.000Z

446

Graphic update of automated logic diagrams  

Science Journals Connector (OSTI)

The Automated Logic Diagram, or ALD, is a well defined document prepared by engineers to specify the design of a machine. 1 The document is coded for computer input by highly trained transcription personnel. Changes or corrections ...

Richard J. Uhlik

1968-07-01T23:59:59.000Z

447

Mirle Automation Corporation | Open Energy Information  

Open Energy Info (EERE)

Mirle Automation Corporation Mirle Automation Corporation Jump to: navigation, search Name Mirle Automation Corporation Place Hsinchu, Taiwan Zip 30077 Sector Solar Product A Taiwan-based automation system integrators and related product manufacturers who have entered thin film solar cell manufacturing equipment business. Coordinates 24.69389°, 121.148064° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":24.69389,"lon":121.148064,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

448

Distributed Intelligent Automated Demand Response (DIADR) Building  

Broader source: Energy.gov (indexed) [DOE]

Distributed Intelligent Automated Demand Distributed Intelligent Automated Demand Response (DIADR) Building Management System Distributed Intelligent Automated Demand Response (DIADR) Building Management System The U.S. Department of Energy (DOE) is currently conducting research into distributed intelligent-automated demand response (DIADR) building management systems. Project Description This project aims to develop a DIADR building management system with intelligent optimization and control algorithms for demand management, taking into account a multitude of factors affecting cost including: Comfort Heating, ventilating, and air conditioning (HVAC) Lighting Other building systems Climate Usage and occupancy patterns. The key challenge is to provide the demand response the ability to address more and more complex building systems that include a variety of loads,

449

Design automation for microfluidics-based biochips  

Science Journals Connector (OSTI)

Advances in microfluidics technology offer exciting possibilities in the realm of enzymatic analysis, DNA analysis, proteomic analysis involving proteins and peptides, immunoassays, implantable drug delivery devices, and environmental toxicity monitoring. ... Keywords: Microfluidics, biochips, design automation

Krishnendu Chakrabarty; Jun Zeng

2005-10-01T23:59:59.000Z

450

Automating Logic Rectification by Approximate SPFDs  

Science Journals Connector (OSTI)

In the digital VLSI cycle, a netlist is often modified to correct design errors, perform small specification changes or implement incremental rewiring-based optimization operations. Most existing automated logic rectification tools use a small set of ... Keywords: SAT-based algorithm, approximate SPFD, digital VLSI cycle, design errors, incremental rewiring-based optimization operations, automated logic rectification tools, predefined logic transformations, memory/time explosion problem

Yu-Shen Yang; S. Sinha; A. Veneris; R. K. Brayton

2007-01-01T23:59:59.000Z

451

Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Federal Operational Readiness Review  

Broader source: Energy.gov (indexed) [DOE]

Federal Operational Readiness Review June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2 4.0 Results ................................................................................................................................................... 2

452

Financing Capture Ready Coal-Fired Power Plants in China by Issuing Capture Options  

E-Print Network [OSTI]

more economically with carbon dioxide capture and storage (CCS) technologies, however financing. Keywords: Capture Option, Capture Ready, Carbon Capture and Storage, Climate Change, Coal-fired Electricity;List of Abbreviations CAPM (Capital Asset Pricing Model) CCS (Carbon Capture and Storage) CEC (China

Aickelin, Uwe

453

Team leader`s preparation guide for Operational Readiness Reviews (ORR)  

SciTech Connect (OSTI)

This document provides instructions, explanations, and examples for the performance of all phases of an Operational Readiness Review (ORR). Details pertinent to the team leader, team members, and review coordinator are outlined. Sample forms and correspondence are included in appendices. Although this document is for use by DOE ORR team leaders, it can be used by contractor ORR team leaders also.

Not Available

1994-09-01T23:59:59.000Z

454

DOE Zero Energy Ready Home Case Study: Clifton View Homes, Whidbey Island, WA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home on Whidbey Island, WA, that scores HERS 37 without PV or HERS -13 with 10 kW PV, enough to power the home and an electric car. The two-story custom home...

455

DOE Zero Energy Ready Home Case Study, Weiss Building & Development, LLC., Custom Home, Downer Grove, IL  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Downers Grove, IL that scored HERS 35 without PV. This 3,600 ft2 custom home has advanced framed walls with R-23 dense-packed fiberglass plus R-13 rigid polyiso, a sealed attic with open-cell spray foam, a pier foundation, and 95% efficient gas furnace.

456

DOE Zero Energy Ready Home Case Study, Palo Duro Homes, Inc., Albuquerque, NM, Production  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Aztec, NM that scored HERS 49 without PV. This 2,064 ft2 production home has advance framed walls, a spray foamed attic, an air source heat pump, and an HRV.

457

DOE Zero Energy Ready Home Case Study: Cobblestone Homes, Midland, MI  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Midland, MI, that scored HERS 49 without PV or HERS 44 with 1.4 kW of PV. The custom home served as a prototype and energy efficiency demonstration...

458

DOE Zero Energy Ready Home Case Study: KB Home, Lancaster, CA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Lancaster, CA, that achieved a HERS 43 without PV 43 or HERS 0 with 6.9-kW PV. The two-story, 2,537ft2 home serves as a model for the production...

459

DOE Zero Energy Ready Home Case Study, KB Home, San Marcos, CA, Production Home  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in San Marcos, CA that scored HERS 52 without PV, -4 with PV. This 52,778 ft2 production home has R-20 advanced framed walls with batts plus rigid foam sheathing, an air-source heat pump for central air in sealed attic, solar water heating and 100% LED lighting.

460

DOE Zero Energy Ready Home Case Study: Amerisips Homes, Charleston, SC  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home on Johns Island in Charleston, SC, that scored HERS 30 without PV, or HERS 1 with 6-kW of PV. This custom 2-story, 2,085 ft2, home is constructed of...

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

DOE Zero Energy Ready Home Case Study, Garbett Homes, Herriman, UT, Production Home  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Herriman, UT, that scored HERS 40 without PV, -1 with PV. This 4,111 ft2 production home has R-23 advanced framed walls, and a vented attic with R-60 blown fiberglass.

462

Physics and Astronomy Department San Francisco State University Physics Readiness Exam  

E-Print Network [OSTI]

Physics and Astronomy Department San Francisco State University Physics Readiness Exam Math Qualification Test for Introductory Physics ­ Physics 111 or Physics 220 In addition to meeting course prerequisites, students wishing to enroll in Physics 111 or Physics 220 must demonstrate adequate competence

Golterman, Maarten

463

Inclusive Computer Science Education Using a Ready-made Computer Game Framework  

E-Print Network [OSTI]

Inclusive Computer Science Education Using a Ready-made Computer Game Framework Joseph Distasio and Thomas P. Way Applied Computing Technology Laboratory Department of Computing Sciences Villanova the prevailing interest in computer games among college students, both for entertainment and as a possible career

Way, Thomas

464

DOE Zero Energy Ready Home Case Study: Mandalay Homes, Prescott Valley, AZ  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in northern AZ that achieved a HERS score of 48 without PV or 25 if 3.5 kW PV were added. The two-story, 2,469-ft2 production home has 2x4 walls filled...

465

DOE Zero Energy Ready Home Case Study: AquaZephyr, Ithaca, NY  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Ithaca, NY, that achieves a HERS 56 without PV or HERS 15 with 4-kW of PV. The two-story, 1,664-ft2 home is one of 17 single-family and 4 duplex homes...

466

DOE Zero Energy Ready Home Case Study: John Hubert Associates, North Cape May, NJ  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in North Cape May, NJ, that scored a HERS 46 without PV or HERS 9 with 6.5 kW of PV. The two-story, 1,871-ft2 home has advanced-framed above-grade walls...

467

DOE Zero Energy Ready Home Case Study: M Street Homes, Houston, TX  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Houston, TX, that achieves a HERS 45 without PV or HERS 32 with 1.2 kW PV. The three-story, 4,507-ft2 custom home is powered by a unique tri-generation...

468

DOE Zero Energy Ready Home Case Study: Sterling Brook Custom Homes, Double Oak, TX  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Double Oak, TX, north of Dallas, that scored a HERS 44 without PV. The 3,752-ft2 two-story home served as an energy-efficient model home for the custom...

469

DOE Zero Energy Ready Home Case Study: The Imery Group, Serenbe, GA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Serenbe, GA, that scored a HERS 40 without PV or HERS -10 with PV. The 2,811-ft2, two-story custom home has 2x6, advanced framed walls filled with R-20...

470

DOE Zero Energy Ready Home Case Study, New Town Builders, Denver, CO, Production Home  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Denver, CO that scored HERS 41 without PV, HERS 3 with PV. This 3,560 ft2 production home has R-36 double-stud walls, a vented attic with R-50 blown fiberglass, and a 97% efficient gas furnace with ducts in conditioned space.

471

Philadelphia Gas Works Looking for a challenge and ready to power up your career?  

E-Print Network [OSTI]

Philadelphia Gas Works Looking for a challenge and ready to power up your career? The Philadelphia Gas Works (PGW) is the largest municipally-owned gas utility in the nation, supplying gas service into the large, modern facility that exists today. As one of the nation's leading natural gas providers, PGW

Plotkin, Joshua B.

472

DOE Zero Energy Ready Home Case Study: Southeast Volusia Habitat for Humanity, Edgewater, FL  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready affordable home in Edgewater, FL, that achieves a HERS score of 49 without PV. The one-story, 1,250-ft2 home has 2x4 walls with fiberglass batt inside plus R-3...

473

Explicit-Ready Nonlinear Model Predictive Control for Turbocharged Spark-Ignited Engines  

E-Print Network [OSTI]

Explicit-Ready Nonlinear Model Predictive Control for Turbocharged Spark- Ignited Engines J. El with saturated actuators. In this context, the need for model-based control laws is greater than ever with saturated actuators. In this paper, we evaluate the benefits of a nonlinear model predictive control (NMPC

Paris-Sud XI, Université de

474

DOE Zero Energy Ready Home Case Study: Greenhill Contracting, New Paltz, NY  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in New Paltz, NY, that achieved a HERS score of 37 without PV or 7 with 7.5-kW PV. The two-story 2,288-ft2 home is one of 9 certified homes. All of the...

475

A System Architecture for Sharing De-Identified, Research-Ready Brain Scans  

E-Print Network [OSTI]

A System Architecture for Sharing De-Identified, Research-Ready Brain Scans and Health Information Department of Radiology Abstract. Progress in our understanding of brain disorders increasingly relies on the costly collection of large standardized brain magnetic resonance imaging (MRI) data sets. Moreover

Chervenak, Ann

476

DOE Zero Energy Ready Home Case Study: Brookside Development, Derby, CT  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Derby, CT, that achieves a HERS score of 45 without PV or HERS 26 with PV. The production home is one of a development of 7 two-story, 4,000+-ft2...

477

Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report  

SciTech Connect (OSTI)

This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.

Wight, R.H.

1997-05-30T23:59:59.000Z

478

DOE Zero Energy Ready Home Case Study: Caldwell and Johnson, Charlestown, RI  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready affordable home in Charlestown, RI, that achieved a HERS Index of 47 without PV. The 2,244-ft2 two-story home with basement has 2x6 walls filled with 5.5 in. ...

479

DOE Zero Energy Ready Home Case Study, Caldwell and Johnson, Exeter, RI, Custom Home  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Exeter, Rhode Island, that scored HERS 43 without PV. This 2,000 ft2 custom home has a spray- foamed attic and walls, plus rigid foam sheathing, ducted mini-split heat pumps, and an HRV.

480

Organizational readiness for innovation in health care: some lessons from the recent literature  

E-Print Network [OSTI]

- vation) is unlikely. Furthermore, innovation must compete with other goals of health-care reformPA P E R S Organizational readiness for innovation in health care: some lessons from the recent innovation in health care, as the interaction between the innovation and the context of its introduction

Birmingham, University of

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

DOE Zero Energy Ready Home Case Study, Manatee County Habitat for Humanity, Ellenton, FL, Affordable  

Broader source: Energy.gov [DOE]

Case-study of a DOE Zero Energy Ready Home in Ellenton, FL that scored HERS 53 without PV, HERS 23 with PV. This 1,143 ft2 affordable home has R-23 ICF walls, a spray-foamed sealed attic, solar hot water, and a ducted mini-split heat pump.

482

DOE Zero Energy Ready Home Case Study: New Town Builders, Denver, CO  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Denver, CO, that achieves HERS 38 without PV or HERS -3 with 8.0 kW of PV. The 2,115-ft2 two-story production home has 9.5-in.-thick double-stud walls...

483

User readiness to interact with information systems - a human activity perspective  

E-Print Network [OSTI]

This study focuses on how and why people become ready to interact with certain information systems (IS) based on their previous experiences with the same and/or similar systems. User-system interaction can be regarded as a mediated and collaborative...

Sun, Jun

2006-10-30T23:59:59.000Z

484

MOVIE "CHICAGO CITY COUNCIL: READY FOR REFORM?" (27 minutes/color)  

E-Print Network [OSTI]

, transportation, and health care. 8. Investigate how many of the reform proposals were in place twenty years afterMOVIE ­ "CHICAGO CITY COUNCIL: READY FOR REFORM?" (27 minutes/color) SYNOPSIS Following the death of Mayor Harold Washington, residents and reformers of Chicago still hoped for continued reform in Chicago

Illinois at Chicago, University of

485

DOE Zero Energy Ready Home Case Study, BPC Green Builders, Custom Home, New Fairfield, CT  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in west Connecticut that scored HERS 39 without solar PV. The 3,000 ft2 two-story home has R-33 double-walls, R-72 flat roof with closed-cell foam and blown cellulose, an ERV, and LED lighting.

486

DOE Zero Energy Ready Home Case Study, e2Homes, Winterpark, FL, Custom Homes  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Winter Park, FL that scored HERS 57 without PV or HERS -7 with PV. This 4,305 ft2 custom home has autoclaved aerated concrete walls, a sealed attic with R-20 spray foam, and ductless mini-split heat pumps.

487

DOE Zero Energy Ready Home Case Study, Ithaca Neighborhood Housing Services, Ithaca, NY  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready Home in Ithaca, NY, that scored HERS 50 without PV. These 1,160 ft2 affordable town houses have R-20 advance framed walls, R-52 blown cellulose in attic, radiant heat with 92.5 AFUE boiler, and triple-pane windows.

488

Japan ready to pay 895 million dollars more to host ITER project: report  

E-Print Network [OSTI]

Japan ready to pay 895 million dollars more to host ITER project: report 26 May 2004 Japan the deadlock between Japan and the European Union over the venue of the International Thermonuclear in the 10-billion-dollar project are the European Union, Japan, China, Russia, South Korea and the United

489

Analysis of Open Automated Demand Response Deployments in California and Guidelines to Transition to Industry Standards  

E-Print Network [OSTI]

to Automated Demand Response and the OpenADR Automated Demand Response Program. https://Data for Automated Demand Response in Commercial

Ghatikar, Girish

2014-01-01T23:59:59.000Z

490

Open Automated Demand Response Technologies for Dynamic Pricing and Smart Grid  

E-Print Network [OSTI]

for Automated Demand Response in Commercial Buildings. In2010. Open Automated Demand Response Dynamic Pricing2009. Open Automated Demand Response Communications

Ghatikar, Girish

2010-01-01T23:59:59.000Z

491

Explorations of Space-Charge Limits in Parallel-Plate Diodes and Associated Techniques for Automation  

E-Print Network [OSTI]

and Associated Techniques for Automation by Benjamin Ragan-and Associated Techniques for Automation Copyright 2013 byand Associated Techniques for Automation by Benjamin Ragan-

Ragan-Kelley, Benjamin

2013-01-01T23:59:59.000Z

492

Demonstration of Datacenter Automation Software and Hardware (DASH) at the California Franchise Tax Board  

E-Print Network [OSTI]

of Datacenter Automation Software and Hardware (DASH) at theof Datacenter Automation Software and Hardware (DASH) at theprotocol for building automation and control networks. It is

Bell, Geoffrey C.

2010-01-01T23:59:59.000Z

493

Automation for on-line remote-control in-situ electron microscopy  

E-Print Network [OSTI]

Pfefferkorn Conference (1996) Automation for On-Line Remote-Pfefferkorn Conference (1996) Automation for On-Line Remote-by incorporating local automation of stage control and

1996-01-01T23:59:59.000Z

494

Automated Demand Response Technologies and Demonstration in New York City using OpenADR  

E-Print Network [OSTI]

EMCS Vendor and Product Automated Logic Control RemoteBuildings Integrator, Automated Logic Corporations WebCTRLIntegrator (EBI), Automated Logic Corporations WebCTRL ,

Kim, Joyce Jihyun

2014-01-01T23:59:59.000Z

495

Automated diagnostics scoping study. Final report  

SciTech Connect (OSTI)

The objective of the Automated Diagnostics Scoping Study was to investigate the needs for diagnostics in building operation and to examine some of the current technologies in automated diagnostics that can address these needs. The study was conducted in two parts. In the needs analysis, the authors interviewed facility managers and engineers at five building sites. In the technology survey, they collected published information on automated diagnostic technologies in commercial and military applications as well as on technologies currently under research. The following describe key areas that the authors identify for the research, development, and deployment of automated diagnostic technologies: tools and techniques to aid diagnosis during building commissioning, especially those that address issues arising from integrating building systems and diagnosing multiple simultaneous faults; technologies to aid diagnosis for systems and components that are unmonitored or unalarmed; automated capabilities to assist cause-and-effect exploration during diagnosis; inexpensive, reliable sensors, especially those that expand the current range of sensory input; technologies that aid predictive diagnosis through trend analysis; integration of simulation and optimization tools with building automation systems to optimize control strategies and energy performance; integration of diagnostic, control, and preventive maintenance technologies. By relating existing technologies to perceived and actual needs, the authors reached some conclusions about the opportunities for automated diagnostics in building operation. Some of a building operator`s needs can be satisfied by off-the-shelf hardware and software. Other needs are not so easily satisfied, suggesting directions for future research. Their conclusions and suggestions are offered in the final section of this study.

Quadrel, R.W.; Lash, T.A.

1994-06-01T23:59:59.000Z

496

Fully Automated Laser Ablation Liquid Capture Sample Analysis using NanoElectrospray Ionization Mass Spectrometry  

SciTech Connect (OSTI)

RATIONALE: Laser ablation provides for the possibility of sampling a large variety of surfaces with high spatial resolution. This type of sampling when employed in conjunction with liquid capture followed by nanoelectrospray ionization provides the opportunity for sensitive and prolonged interrogation of samples by mass spectrometry as well as the ability to analyze surfaces not amenable to direct liquid extraction. METHODS: A fully automated, reflection geometry, laser ablation liquid capture spot sampling system was achieved by incorporating appropriate laser fiber optics and a focusing lens into a commercially available, liquid extraction surface analysis (LESA ) ready Advion TriVersa NanoMate system. RESULTS: Under optimized conditions about 10% of laser ablated material could be captured in a droplet positioned vertically over the ablation region using the NanoMate robot controlled pipette. The sampling spot size area with this laser ablation liquid capture surface analysis (LA/LCSA) mode of operation (typically about 120 m x 160 m) was approximately 50 times smaller than that achievable by direct liquid extraction using LESA (ca. 1 mm diameter liquid extraction spot). The set-up was successfully applied for the analysis of ink on glass and paper as well as the endogenous components in Alstroemeria Yellow King flower petals. In a second mode of operation with a comparable sampling spot size, termed laser ablation/LESA , the laser system was used to drill through, penetrate, or otherwise expose material beneath a solvent resistant surface. Once drilled, LESA was effective in sampling soluble material exposed at that location on the surface. CONCLUSIONS: Incorporating the capability for different laser ablation liquid capture spot sampling modes of operation into a LESA ready Advion TriVersa NanoMate enhanced the spot sampling spatial resolution of this device and broadened the surface types amenable to analysis to include absorbent and solvent resistant materials.

Lorenz, Matthias [ORNL] [ORNL; Ovchinnikova, Olga S [ORNL] [ORNL; Van Berkel, Gary J [ORNL] [ORNL

2014-01-01T23:59:59.000Z

497

ISA Approves Standard for Wireless Automation in Process Control  

Broader source: Energy.gov (indexed) [DOE]

ISA Approves Standard for Wireless Automation in Process Control ISA Approves Standard for Wireless Automation in Process Control Applications ISA Approves Standard for Wireless Automation in Process Control Applications On September 9, the Standards and Practices Board of the International Society for Automation (ISA) approved the ISA-100.11a wireless standard, "Wireless Systems for Industrial Automation: Process Control and Related Applications," making it an official ISA standard. ISA Approves Standard for Wireless Automation in Process Control Applications More Documents & Publications DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan Wireless System Considerations When Implementing NERC Critical Infrastructure Protection Standards Control Systems Security Standards: Accomplishments And Impacts

498

n-Tiered Test Automation Architecture for Agile Software Systems  

Science Journals Connector (OSTI)

Abstract This paper introduces a multi-tiered test automation architecture to optimize test automation in an Agile software development environment while increasing both the test coverage and depth of each tier. Test Automation is the act of converting manual test cases into automated scripts that can be executed autonomously. In general, testing accounts for roughly 60% of the overall development budget and approximately 50% of that is attributed to regression testing. In recent years software organizations have begun migrating to Agile software development practices and automated testing in hopes of reducing the cost, lengthy regression cycles, and time to market. Traditionally, test automation is conducted on stable, non-changing applications. In an Agile environment where the code constantly changes, automated test cases become obsolete and must constantly be refactored in order to provide meaningful feedback about the system's quality. In most instances the cost of maintenance of automated test code completely overshadows the entire automation effort and negates any possible Return on Investment (RoI). An n-Tiered Test Automation Architecture seeks to retain the RoI by abstracting the automation project into separate distinct tiers; Presentation, Business, Data, and Services. These abstractions allow automated testing to continue providing feedback despite the constant revision of the system. A case study was conducted using this method and the observations showed that the automation architecture was resilient to change while increasing the test coverage, the depth of testing, and the overall quality of the application under test.

Patrick Day

2014-01-01T23:59:59.000Z

499

Field Testing of Automated Demand Response for Integration of Renewable Resources in California's Ancillary Services Market for Regulation Products  

E-Print Network [OSTI]

Controls Larry Bacher, Automated Logic Corporation Louiscontrolled from a central Automated Logic Corporation energy

Kiliccote, Sila

2013-01-01T23:59:59.000Z

500

Definition: Automated Capacitors | Open Energy Information  

Open Energy Info (EERE)

Capacitors Capacitors Jump to: navigation, search Dictionary.png Automated Capacitors Capacitors can increase the voltage on a distribution circuit by providing reactive power (often referred to as volt-amperes-reactive or VArs). Capacitor banks are switched in discrete steps, either manually, or in response to the voltage at the location where they are connected; typically, distribution capacitor banks are switched in a single step. If the voltage falls too far below the set point, the capacitor is switched in to raise the voltage. If the voltage rises too high above the set point, the capacitor is switched out to lower the voltage. Automated capacitors can be switched in coordination with other voltage control devices with signals from local sensors, distribution automation systems, or grid