Powered by Deep Web Technologies
Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

2012 SG Peer Review - Recovery Act: NSTAR Automated Mater Reading Based Dynamic Pricing - Douglas Horton, NSTAR Electric & Gas  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Peer Peer Review Meeting Peer Review Meeting AMR Based Dynamic Pricing y g Doug Horton NSTAR Electric & Gas Co. 6/8/2012 AMR Based Dynamic Pricing Objective Provide two-way communication of electricity cost & consumption data utilizing the customers existing meter & Internet. Goal to achieve 5% reduction in peak and Goal to achieve 5% reduction in peak and average load. Life-cycle Funding ($K) Total Budget Total DOE Funding to Technical Scope Use customer's existing AMR meter and broadband Internet to achieve two way Total Budget Total DOE Funding Funding to Date $4,900k $2,362k $1,623k broadband Internet to achieve two way communication and "AMI" functionality Cutting-edge solution to integrate: * Existing meters E i ti I t t December 2008 * Existing Internet * Existing billing & CIS

2

Nstar | Open Energy Information  

Open Energy Info (EERE)

Nstar Nstar Jump to: navigation, search Logo: Nstar Name Nstar Address One NSTAR Way Place Westwood, Massachusetts Zip 02090 Product Utilities Number of employees 1001-5000 Website http://www.nstar.com/business/ Coordinates 42.204066°, -71.159901° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.204066,"lon":-71.159901,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

3

NSTAR | Open Energy Information  

Open Energy Info (EERE)

NSTAR NSTAR Jump to: navigation, search Name NSTAR Place Westwood, Massachusetts Zip 2090 Product A Massachusetts-based utility. Coordinates 40.991995°, -74.035644° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.991995,"lon":-74.035644,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

4

NSTAR Electric | Open Energy Information  

Open Energy Info (EERE)

NSTAR Electric NSTAR Electric Address One NSTAR Way Place Westwood, Massachusetts Zip 02090 Sector Services Product Green Power Marketer Website http://www.nstar.com/ Coordinates 42.204066°, -71.159901° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.204066,"lon":-71.159901,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

5

NSTAR Electric Company | Open Energy Information  

Open Energy Info (EERE)

(Redirected from Boston Edison Company) (Redirected from Boston Edison Company) Jump to: navigation, search Name NSTAR Electric Company Place Norfolk, Massachusetts Service Territory Massachusetts Website www.nstar.com/residential Green Button Landing Page www.nstar.com/residential Green Button Reference Page www.nstar.com/ss3/nstar_n Green Button Implemented Yes Utility Id 54913 Utility Location Yes Ownership I NERC Location NPCC NERC NPCC Yes ISO NE Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] SGIC[2] Energy Information Administration Form 826[3] LinkedIn Connections CrunchBase Profile No CrunchBase profile.

6

NSTAR Electric Company | Open Energy Information  

Open Energy Info (EERE)

Place Norfolk, Massachusetts Place Norfolk, Massachusetts Service Territory Massachusetts Website www.nstar.com/residential Green Button Landing Page www.nstar.com/residential Green Button Reference Page www.nstar.com/ss3/nstar_n Green Button Implemented Yes Utility Id 54913 Utility Location Yes Ownership I NERC Location NPCC NERC NPCC Yes ISO NE Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] SGIC[2] Energy Information Administration Form 826[3] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. NSTAR Electric Company Smart Grid Project was awarded $10,061,883 Recovery

7

NSTAR (Electric) - Business Solutions Program | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NSTAR (Electric) - Business Solutions Program NSTAR (Electric) - Business Solutions Program NSTAR (Electric) - Business Solutions Program < Back Eligibility Agricultural Commercial Construction Fed. Government Industrial Institutional Local Government Nonprofit Schools State Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Manufacturing Other Construction Heat Pumps Appliances & Electronics Commercial Lighting Lighting Maximum Rebate Contact NSTAR Program Info State Massachusetts Program Type Utility Rebate Program Rebate Amount New Construction Custom: Contact NSTAR Municipalities: Contact NSTAR Lighting (Custom): $0.40/watt reduction (Tier 1); $1/watt reduction (Tier 2) Fluorescent Fixtures: $10 - $30 LED Lighting (Downlights): $10 - $30 LED Lighting (Refrigeration): $45

8

NSTAR (Electric) - Small Business Direct Install Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NSTAR (Electric) - Small Business Direct Install Program NSTAR (Electric) - Small Business Direct Install Program NSTAR (Electric) - Small Business Direct Install Program < Back Eligibility Commercial Local Government Nonprofit State Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Other Home Weatherization Commercial Weatherization Sealing Your Home Ventilation Manufacturing Heat Pumps Appliances & Electronics Commercial Lighting Lighting Program Info State Massachusetts Program Type Utility Rebate Program Rebate Amount Up to 70% of the total project cost Provider NSTAR The NSTAR Small Business Solutions Program offers incentives for business customers whose average monthly demand is 300 kW or less. The first step of the program is a free energy audit to identify potential energy saving

9

NSTAR (Gas) - Commercial Energy Efficiency Programs | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NSTAR (Gas) - Commercial Energy Efficiency Programs NSTAR (Gas) - Commercial Energy Efficiency Programs NSTAR (Gas) - Commercial Energy Efficiency Programs < Back Eligibility Commercial Industrial Savings Category Heating & Cooling Commercial Heating & Cooling Heating Other Appliances & Electronics Commercial Weatherization Water Heating Program Info State Massachusetts Program Type Utility Rebate Program Rebate Amount Forced Hot Water Boilers: $500-$15,000 Boiler Reset Controls: $225 Condensing Unit or Water Heater: $500 On-Demand Unit Heater: $1000 or $1600 Warm Air Furnaces: $400-$800 Indirect Water Heater/Boiler: $400 Tankless Water Heater: $500 or $800 Storage Water Heaters: $50 or $100 Low Intensity Infrared Heating Units: $500 High Efficiency Cooking Equipment: up to $1,000 Steam Traps: $25 Programmable Thermostats: $25

10

NSTAR Electric Company Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Company Smart Grid Project Company Smart Grid Project Jump to: navigation, search Project Lead NSTAR Electric Company Country United States Headquarters Location Norfolk, Massachusetts Recovery Act Funding $10,061,883.00 Total Project Value $20,123,766.00 Coverage Area Coverage Map: NSTAR Electric Company Smart Grid Project Coordinates 42.1195426°, -71.3250563° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

11

NSTAR Electric & Gas Corporation Smart Grid Demonstration Project (2) |  

Open Energy Info (EERE)

Lead NSTAR Electric & Gas Corporation Lead NSTAR Electric & Gas Corporation Country United States Headquarters Location Westwood, Massachusetts Recovery Act Funding $5,267,592.00 Total Project Value $10,535,184.00 Coordinates 42.2139873°, -71.2244987° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

12

NSTAR Electric & Gas Corporation Smart Grid Demonstration Project | Open  

Open Energy Info (EERE)

NSTAR Electric & Gas Corporation NSTAR Electric & Gas Corporation Country United States Headquarters Location Westwood, Massachusetts Recovery Act Funding $2,362,000.00 Total Project Value $4,724,000.00 Coordinates 42.2139873°, -71.2244987° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

13

Automated Voltage Standard Ready  

Science Conference Proceedings (OSTI)

... We wanted a standard that was ... as envisioned, then within our lifetimes there will no longer be a need for voltage transfer standards that have to be ...

2013-04-08T23:59:59.000Z

14

The Need for Polarization for Extracting Baryon Resonances and the NSTAR Program at CLAS  

SciTech Connect

We report on the NSTAR program in Hall B of JLab on using polarization observables to extract parameters of baryon resonances. The scientific purpose of the program is to improve the understanding of the underlying quark degrees of freedom, especially in the higher resonance regions, where we expect to uncover many of missing baryon resonances that mainly decay through multi-meson channels. With the high-quality beam of circularly- and linearly-polarized photons onto unpolarized and polarized proton and deteurium targets, and coupled with the nearly complete solid angle coverage of CLAS, we will extract the differential cross sections and associated polarization observables obtained by the photoproduction of vector mesons and kaons at center of mass energies of 1.7 to 2.2 GeV. The paper will primarily present the photon beam aspects of the excited baryon program.

Cole, Philip L. [Idaho State University, Dept. of Physics, Pocatello, Idaho 83209 (United States)

2007-10-26T23:59:59.000Z

15

RailReady.pub  

NLE Websites -- All DOE Office Websites (Extended Search)

does RailReady work? The backbone of RailReady is an integrated set of diverse and critical data layers, and a set of analytical capabilities driven by the data. RailReady...

16

Test Automation Test Automation  

E-Print Network (OSTI)

Test Automation Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2013 Mousavi: Test Automation #12;Test Automation Outline Test Automation Mousavi: Test Automation #12;Test Automation Why? Challenges of Manual Testing Test-case design: Choosing inputs

Mousavi, Mohammad

17

Operational Readiness Reviews  

NLE Websites -- All DOE Office Websites (Extended Search)

Readiness Reviews Readiness Reviews Home Applicable Directives, Standards, & Handbooks Start Up Notifications, Plan of Actions, and Implementation Plans Functional Area CRADS...

18

Demand Response-Ready Technology Capabilities: A Summary of Multi-Stakeholder Workshop and Survey Perspectives  

Science Conference Proceedings (OSTI)

This technical update describes technology capabilities that support more automated and ubiquitous demand response. It begins by describing the Demand Response-Ready (DR-Ready) concept and related industry activities that support realization of the concept. In the DR-Ready vision, consumers receive DR-Ready end-use products at the point of purchase, thus eliminating the need for utility truck service visits to retrofit equipment and significantly reducing the cost of deploying DR-enabling technologies. ...

2012-04-06T23:59:59.000Z

19

Demand Response-Ready Capabilities Roadmap: A Summary of Multi-Stakeholder Workshop and Survey Perspectives  

Science Conference Proceedings (OSTI)

The report describes a high-level roadmap for premise-level migration towards more automated and ubiquitous demand response. It begins by describing the Demand Response Ready (DR-Ready) concept and related industry activities supporting realization of the concept. In the DR-Ready vision, consumers receive DR-Ready end-use products at the point of purchase, thus eliminating the need for utility truck rolls to retrofit equipment, and thereby significantly reducing costs of deploying DR enabling ...

2012-12-31T23:59:59.000Z

20

Technology Readiness Assessment Report  

Energy.gov (U.S. Department of Energy (DOE))

This document has been developed to guide individuals and teams that will be involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the...

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Demand Response-Ready End-Use Devices: Guiding Principles for Defining Criteria to Support Grid Needs  

Science Conference Proceedings (OSTI)

This report describes technology capabilities that support more automated and ubiquitous demand response. It reviews the Demand ResponseReady (DR-Ready) concept and related industry activities that support realization of the concept. In the DR-Ready vision, consumers receive DR-Ready end-use products at the point of purchase, thus eliminating the need for utility truck service visits to retrofit equipment, and thereby significantly reducing the cost of deploying DR-enabling ...

2013-12-21T23:59:59.000Z

22

Beamline Commissioning Readiness Review Team  

NLE Websites -- All DOE Office Websites (Extended Search)

Readiness Review Team (BCRRT) 1. Purpose The APS Beamline Commissioning Readiness Review Team (BCRRT) reports to and advises the AES Associate Division Director for Mechanical and...

23

TECHNOLOGY READINESS ASSESSMENT  

NLE Websites -- All DOE Office Websites (Extended Search)

DECEMBER 2012 DECEMBER 2012 Pathway for readying the next generation of affordable clean energy technology -Carbon Capture, Utilization, and Storage (CCUS) 2012 TECHNOLOGY READINESS ASSESSMENT -OVERVIEW 2 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 2012 TECHNOLOGY READINESS ASSESSMENT-OVERVIEW 3 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal li- ability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific

24

HIGHLY AUTOMATED MACROMOLECULAR  

NLE Websites -- All DOE Office Websites (Extended Search)

AUTOMATED MACROMOLECULAR AUTOMATED MACROMOLECULAR CRYSTALLOGRAPHY BEAMLINE (AMX) Group Leader: Dieter Schneider Proposal Team: M. Allaire 1 , L. Berman 1 , M. Chance 2 , W. Hendrickson 3 , A. Héroux 1 , J. Jakoncic 1 , A. Orville 1 , H. Robinson 1 , D. Schneider 1 , W. Shi 2 , A. Soares 1 , V. Stojanoff 1 , R. Sweet 1 1 Brookhaven National Laboratory, 2 Case Western Reserve University, 3 Columbia University MISSION APPLICATIONS AND CAPABILITIES ADDITIONAL INFORMATION * AMX at NSLS-II will provide structural biologists with ready access to an advanced macromolecular crystallography (MX) beamline for the elucidation of structure and function of macromolecular complexes. * Its high flux, tunable energy, and natively small focal spot will make it a crystallographer's preferred beamline. * Its high degree of automation will provide a high throughput

25

Construction Readiness RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Readiness Review Module Construction Readiness Review Module March 2010 CD- [This Rev Readiness -0 view Module w s Review (CRR OFFICE O CD-1 was used to dev R). This Review OF ENVIRO Standard R Construc Rev Critical D CD-2 M velop the Revie w Module cont ONMENTA Review Pla ction Rea view Modul Decision (CD C March 2010 ew Plan for Sal tains the lesson Review.] AL MANAG an (SRP) adiness le D) Applicabili D-3 lt Waste Proce ns learned from GEMENT ity CD-4 ssing Facility ( m the SWPF Co Post Ope (SWPF) Const onstruction Re eration truction eadiness Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental

26

Technology Readiness Assessment Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Readiness Assessment Report Technology Readiness Assessment Report March 2010 U U . . S S . . D D e e p p a a r r t t m m e e n n t t o o f f E E n n e e r r g g y y O O f f f f i i c c e e o o f f E E n n v v i i r r o o n n m m e e n n t t a a l l M M a a n n a a g g e e m m e e n n t t Technology Readiness Assessment (TRA) / Technology Maturation Plan (TMP) Process Guide March 2008 U.S. DOE Office of Environmental Management March 2008 TRA/TMP Process Guide Page 2 of 48 TABLE OF CONTENTS 1.0 INTRODUCTION ...................................................................................................................... 4 1.1 Document Purpose............................................................................................................................ 4 2.0 OVERVIEW OF TECHNOLOGY READINESS ASSESSMENTS AND TECHNOLOGY MATURATION PLANS

27

Ready, set, go . . . well maybe  

SciTech Connect

The agenda for this presentation is: (1) understand organizational readiness for changes; (2) review benefits and challenges of change; (3) share case studies of ergonomic programs that were 'not ready' and some that were 'ready'; and (4) provide some ideas for facilitating change.

Alexandre, Melanie M; Bartolome, Terri-Lynn C

2011-02-28T23:59:59.000Z

28

Readiness Review RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Readiness Review Module Readiness Review Module March 2010 CD-0 O 0 OFFICE OF C CD-1 F ENVIRO Standard R Readin Rev Critical Decis CD-2 M ONMENTAL Review Plan ness Rev view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) view e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-

29

Readiness Review Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review Program Review Program FUNCTIONAL AREA GOAL: DOE/NNSA Headquarters and Field organizations and their contractors responsible for the startup and operation of nuclear facilities have defined and implemented contractual requirements to manage, evaluate, and approve the startup and restart of nuclear facilities and activities. REQUIREMENTS:  DOE Order 425.1C, Startup and Restart of Nuclear Facilities  DOE P 450.4, Safety Management System Policy  DOE/NNSA Safety Management Functions, Responsibilities and Authorities Manual Guidance:  DOE-STD-3006-2000, Planning and Conduct of Operational Readiness Reviews  DOE-HDBK- 3012-2003, Operational Readiness Review Team Leaders Handbook  DOE G 450.4-1B, Integrated Safety Management System Guide

30

Readiness Review Training - Member | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Member Member Readiness Review Training - Member November 10, 2010 Readiness Review Member Training at the Idaho National Laboratory Course provides tools and tips to be an effective readiness review team member. Topics include: An understanding of the background behind the Readiness Review Process; Training in the mechanics of performance and reporting of a Readiness Review; Knowledge of current DOE Orders, Directives, and References for the Readiness Review process; Training in Performance-Based Assessment Processes and Official DOE Team Member Readiness Review Training Methods Readiness Review Training - Member More Documents & Publications Readiness Review Training - Team Leader Readiness Review Training - Development of Criteria And Review Approach Documents

31

Automation Status  

NLE Websites -- All DOE Office Websites (Extended Search)

NREL Manufacturing R&D Workshop NREL Manufacturing R&D Workshop NREL H2/FC Manufacturing R&D Workshop Automation Status Garry Sperrick garry@sperkllc.com 585-259-0311 August 11, 2011 Automation Status NREL Manufacturing R&D Workshop Presentation Overview ƒ Brief Introduction ƒ DOE / NREL - Review & Discussion ƒ Automation Platforms ƒ Automation Processes ƒ Automation Considerations of the Manufacturer ƒ Manufacturer and the Supplier ƒ Three (3) Automation Programs Following these Guidelines ƒ Automotive Component Manufacturing ƒ Medical Manufacturing ƒ Membrane Electrode Assembly Manufacturing ƒ Hypothetical Fuel Cell Manufacturing Platforms August 11, 2011 Automation Status NREL Manufacturing R&D Workshop Professional Bio ƒ Automation Technician - Mobil Chemical

32

Home Automation  

E-Print Network (OSTI)

In this paper I briefly discuss the importance of home automation system. Going in to the details I briefly present a real time designed and implemented software and hardware oriented house automation research project, capable of automating house's electricity and providing a security system to detect the presence of unexpected behavior.

Ahmed, Zeeshan

2010-01-01T23:59:59.000Z

33

The managed readiness simulator: a force readiness model  

Science Conference Proceedings (OSTI)

This paper presents an overview of a force readiness simulation tool that has been developed for the Canadian Forces (CF). The Managed Readiness Simulator (MARS) is a versatile program that allows the user to quickly simulate a wide range of scenarios ...

Christine Scales; Stephen Okazawa; Michael Ormrod

2011-12-01T23:59:59.000Z

34

Measuring e-government readiness  

Science Conference Proceedings (OSTI)

We proposed a way of assessing readiness of a government organization to transform itself into a provider of fully integrated e-government services. We identified major components of e-government and discussed how it could evolve from a simple website ... Keywords: E-government readiness, E-government transformation, Information technology, Instrument development, Internet, Public sector

Chang E. Koh; Victor R. Prybutok; Xiaoni Zhang

2008-12-01T23:59:59.000Z

35

Process development for automated solar cell and module production. Task 4: automated array assembly  

DOE Green Energy (OSTI)

The scope of work under this contract involves specifying a process sequence which can be used in conjunction with automated equipment for the mass production of solar cell modules for terrestrial use. This process sequence is then critically analyzed from a technical and economic standpoint to determine the technological readiness of each process step for implementation. The process steps are ranked according to the degree of development effort required and according to their significance to the overall process. Under this contract the steps receiving analysis were: back contact metallization, automated cell array layup/interconnect, and module edge sealing. For automated layup/interconnect both hard automation and programmable automation (using an industrial robot) were studied. The programmable automation system was then selected for actual hardware development. Economic analysis using the SAMICS system has been performed during these studies to assure that development efforts have been directed towards the ultimate goal of price reduction. Details are given. (WHK)

Hagerty, J.J.

1980-06-30T23:59:59.000Z

36

Test Automation Ant JUnit Test Automation  

E-Print Network (OSTI)

Test Automation Ant JUnit Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2012 Mousavi: Test Automation #12;Test Automation Ant JUnit Outline Test Automation Ant JUnit Mousavi: Test Automation #12;Test Automation Ant JUnit Why? Challenges of Manual Testing

Mousavi, Mohammad

37

Clean Cities: Electric Vehicle Community Readiness Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Financial Opportunities Financial Opportunities Printable Version Share this resource Send a link to Clean Cities: Electric Vehicle Community Readiness Projects to someone by E-mail Share Clean Cities: Electric Vehicle Community Readiness Projects on Facebook Tweet about Clean Cities: Electric Vehicle Community Readiness Projects on Twitter Bookmark Clean Cities: Electric Vehicle Community Readiness Projects on Google Bookmark Clean Cities: Electric Vehicle Community Readiness Projects on Delicious Rank Clean Cities: Electric Vehicle Community Readiness Projects on Digg Find More places to share Clean Cities: Electric Vehicle Community Readiness Projects on AddThis.com... Current Opportunities Related Opportunities Funded Projects Recovery Act Projects Community Readiness Projects Alternative Fuel Market Projects

38

Vehicle Technologies Office: Community and Fleet Readiness  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis Workplace Charging Community and Fleet Readiness Workforce Development Plug-in Electric Vehicle Basics Community and Fleet Readiness As researchers work to lower the...

39

Environmental readiness document magnetohydrodynamics  

DOE Green Energy (OSTI)

The major areas of environmental concern with regard to the commercialization of coal-fired MHD generators are discussed. MHD technology and expectations about its future utilization are described. Information pertinent to the technology was drawn from the DOE technology program office and from an Environmental Development Plan developed for the technology by EV and the program office through an Environmental Coordination Committee. The environmental concerns associated with the technology are examined, and the current status of knowledge about each concern and its potential seriousness and manageability through regulation and control technology, is discussed. Present and projected societal capabilities to reduce and control undesirable environmental, health, safety, and related social impacts to a level of public acceptability -- as reflected in current and proposed environmental standards -- which will allow the technology to be commercialized and utilized in a timely manner are summarized. The ERD as a whole thus provides an assessment, within the limits of available knowledge and remaining uncertainties, of the future environmental readiness of the technology to contribute to the meeting of the Nation's energy needs. (WHK)

Not Available

1979-07-01T23:59:59.000Z

40

Interim readiness plan  

SciTech Connect

This report provides rough designs and costs for 3 payloads which can be built on a relatively fast time scale. With these, Lawrence Radiation Laboratory (LRL) could measure neutrons and X-rays from high altitude shots. No measurements of soft X-rays (less than or approximately equal to 5 kev), hard X- rays (greater than or approximately equal to 60 kev), or gamma rays would be made. Plans could be made to fly the Simplex payload as part of the spring Lapwing exercise. Some interim capability exists from other sources which might compliment the above measurements. Sandia has developed a mylar sail sampler which could be used for debris experiments. There is a LASL/Sandia scan converter which could be fielded to make fast time-history measurements of the X-ray or gamma ray pulse. Interval time could be measured with a ground based EMP detector. The LRL cost of this interim rocket program is approximately 5 man years of effort and about $140,000 of major procurement. Sandia would need approximately $450,000 to stockpile payloads. I believe the necessary rockets are already stockpiled but some work on the ranges might be required. For example, more launchers are needed on Johnston Atoll. All this money and effort would be expended in FY- 1970 and these rocket experiments would be ready (`on the shelf` or close) by June 1970.

Seward, F. D.

1969-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Energy Efficiency Technology Readiness Guide  

Science Conference Proceedings (OSTI)

As electric power companies strive to meet increasing end-use energy efficiency requirements, they must make decisions about which technologies seem most promising in terms of availability for wide deployment and providing persistent energy savings while also being cost-effective and likely to be adopted by customers. To help electric power companies with these decisions, EPRI has developed this Technology Readiness Guide to provide a readiness assessment of technologies in various stages of ...

2012-12-31T23:59:59.000Z

42

Houston Smart Grid System Almost Ready for Launch | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Grid System Almost Ready for Launch Smart Grid System Almost Ready for Launch Houston Smart Grid System Almost Ready for Launch October 8, 2010 - 11:29am Addthis CenterPoint Energy employees are installing smart meters and automated distribution equipment in the company’s electric grid in Houston, Texas. | Photo courtesy of CenterPoint Energy CenterPoint Energy employees are installing smart meters and automated distribution equipment in the company's electric grid in Houston, Texas. | Photo courtesy of CenterPoint Energy Kevin Craft What does this mean for me? The AMS/IG initiative supports 588 jobs, half of which would not have existed had the company not received money from the Recovery Act. Once their smart meter is installed, consumers are able to access the Smart Meter Texas Portal online to obtain updates on their daily energy

43

An Overview of Readiness for REDD: A compilation of readiness activities  

Open Energy Info (EERE)

An Overview of Readiness for REDD: A compilation of readiness activities An Overview of Readiness for REDD: A compilation of readiness activities prepared on behalf of the Forum on Readiness for REDD Jump to: navigation, search Tool Summary LAUNCH TOOL Name: An Overview of Readiness for REDD: A compilation of readiness activities prepared on behalf of the Forum on Readiness for REDD Agency/Company /Organization: The Woods Hole Research Center Sector: Land Focus Area: Forestry Topics: Implementation, Policies/deployment programs Resource Type: Lessons learned/best practices Website: www.cbd.int/forest/doc/overview-readiness-redd.pdf An Overview of Readiness for REDD: A compilation of readiness activities prepared on behalf of the Forum on Readiness for REDD Screenshot References: Overview of REDD[1] Background "This background document aims to provide a snapshot view of readiness

44

Clean Cities: Electric Vehicle Community Readiness Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

Events Events Printable Version Share this resource Send a link to Clean Cities: Electric Vehicle Community Readiness Workshop to someone by E-mail Share Clean Cities: Electric Vehicle Community Readiness Workshop on Facebook Tweet about Clean Cities: Electric Vehicle Community Readiness Workshop on Twitter Bookmark Clean Cities: Electric Vehicle Community Readiness Workshop on Google Bookmark Clean Cities: Electric Vehicle Community Readiness Workshop on Delicious Rank Clean Cities: Electric Vehicle Community Readiness Workshop on Digg Find More places to share Clean Cities: Electric Vehicle Community Readiness Workshop on AddThis.com... Conferences & Workshops Clean Cities 20th Anniversary Electric Vehicle Community Readiness Stakeholder Summit Waste-to-Wheels Plug-In Vehicle & Infrastructure

45

Solar Ready: An Overview of Implementation Practices  

DOE Green Energy (OSTI)

This report explores three mechanisms for encouraging solar ready building design and construction: solar ready legislation, certification programs for solar ready design and construction, and stakeholder education. These methods are not mutually exclusive, and all, if implemented well, could contribute to more solar ready construction. Solar ready itself does not reduce energy use or create clean energy. Nevertheless, solar ready building practices are needed to reach the full potential of solar deployment. Without forethought on incorporating solar into design, buildings may be incompatible with solar due to roof structure or excessive shading. In these cases, retrofitting the roof or removing shading elements is cost prohibitive. Furthermore, higher up-front costs due to structural adaptations and production losses caused by less than optimal roof orientation, roof equipment, or shading will lengthen payback periods, making solar more expensive. With millions of new buildings constructed each year in the United States, solar ready can remove installation barriers and increase the potential for widespread solar adoption. There are many approaches to promoting solar ready, including solar ready legislation, certification programs, and education of stakeholders. Federal, state, and local governments have the potential to implement programs that encourage solar ready and in turn reduce barriers to solar deployment. With the guidance in this document and the examples of jurisdictions and organizations already working to promote solar ready building practices, federal, state, and local governments can guide the market toward solar ready implementation.

Watson, A.; Guidice, L.; Lisell, L.; Doris, L.; Busche, S.

2012-01-01T23:59:59.000Z

46

Security Automation Conference & Workshop  

Science Conference Proceedings (OSTI)

... Security Automation Conference & Workshop. ... Richard Hale, DISA - Information Security & Security Automation in DoD (coming soon); ...

47

Operational Readiness Team: OPERATIONAL READINESS REVIEW PLAN FOR THE  

NLE Websites -- All DOE Office Websites (Extended Search)

oak ridge oak ridge 12 ...... Prepared by the Operational Readiness Team: OPERATIONAL READINESS REVIEW PLAN FOR THE RAD1 0 1 SOT0 PE THERMOELECTRIC GENERATOR MATERIALS PRODUCTION TASKS R. H. Cooper M. M. Martin C. R. Riggs R. L. Beatty E. K. Ohriner R. N. Escher OISTRIBUTIQM OF THIS DOCUMENT IS UNLIMITED DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency Thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately

48

Automated dispenser  

DOE Patents (OSTI)

An automated dispenser having a conventional pipette attached to an actuating cylinder through a flexible cable for delivering precise quantities of a liquid through commands from remotely located computer software. The travel of the flexible cable is controlled by adjustable stops and a locking shaft. The pipette can be positioned manually or by the hands of a robot. 1 fig.

Hollen, R.M.; Stalnaker, N.D.

1989-04-06T23:59:59.000Z

49

Solar Ready Buildings Planning Guide  

NLE Websites -- All DOE Office Websites (Extended Search)

78 78 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 Technical Report NREL/TP-7A2-46078 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson Prepared under Task No. PVC9.92DA NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any

50

Solar Ready Buildings Planning Guide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6078 6078 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 Technical Report NREL/TP-7A2-46078 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson Prepared under Task No. PVC9.92DA NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any

51

CX-003319: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19: Categorical Exclusion Determination 19: Categorical Exclusion Determination CX-003319: Categorical Exclusion Determination Recovery Act - National Aeronautics and Space Administration Solar Electric Propulsion Technology Application Readiness (NSTAR) Automated Meter Reading (AMR) -Based Dynamic Pricing CX(s) Applied: A1, A9, A11, B2.2, B5.1 Date: 07/30/2010 Location(s): Newton, Massachusetts Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory National Aeronautics and Space Administration Solar Electric Propulsion Technology Application Readiness (NSTAR) will demonstrate the viability of leveraging existing automated meter reading (AMR) deployments to provide much of the functionality of advanced metering infrastructure (AMI), but at a lower cost. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

52

Transportation System Readiness and Resiliency Assessment Framework: Readiness and Assess Resiliency of  

E-Print Network (OSTI)

Transportation System Readiness and Resiliency Assessment Framework: Readiness and Assess Resiliency of Transportation Systems (Infrastructure, Systems, Organization and Services) to Deter, Detect Flows Passenger Flows Supply Chain Efficiency Transportation: Energy Environment Safety Security Vehicle

53

Organizational Readiness in Specialty Mental Health Care  

E-Print Network (OSTI)

the organizational social context (OSC) of mental healthOrganizational Readiness in Specialty Mental Health Careorganizational assessment in specialty mental health, in

Hamilton, Alison B.; Cohen, Amy N.; Young, Alexander S.

2010-01-01T23:59:59.000Z

54

Uranium Downblending and Disposition Project Technology Readiness...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Centers Field Sites Power Marketing Administration Other Agencies You are here Home Uranium Downblending and Disposition Project Technology Readiness Assessment Uranium...

55

ORISE: Asset Readiness Management System (ARMS)  

NLE Websites -- All DOE Office Websites (Extended Search)

How ORISE is Making a Difference Asset Readiness Management System (ARMS) Tracks Emergency Response Exercises and Equipment Developed by the Oak Ridge Institute for Science and...

56

Roundtable on Sustainable Biofuels Certification Readiness Study  

E-Print Network (OSTI)

Roundtable on Sustainable Biofuels Certification Readiness Study: Hawai`i Biofuel Projects Prepared 12.1 Deliverable Bioenergy Analyses Prepared by Hawai`i Biofuel Foundation And NCSI Americas Inc agency thereof. #12;1 RSB Certification Readiness Study: Hawaii Biofuel Projects Prepared For Hawaii

57

Service innovation readiness: Dimensions and performance outcome  

Science Conference Proceedings (OSTI)

This study proposes a higher-order multidimensional construct of service innovation readiness (SIR) based on the organizational change literature and the awareness-motivation-capability perspective. Service innovation is gaining more attention due to ... Keywords: Organizational change, Service innovation, Service innovation performance, Service innovation readiness

Hsiuju Rebecca Yen; Wenkai Wang; Chih-Ping Wei; Sheila Hsuan-Yu Hsu; Hung-Chang Chiu

2012-11-01T23:59:59.000Z

58

Project Get Ready | Open Energy Information  

Open Energy Info (EERE)

Get Ready Get Ready Jump to: navigation, search Name Project Get Ready Agency/Company /Organization Rocky Mountain Institute Sector Energy Focus Area Transportation Topics Implementation Resource Type Dataset Website http://projectgetready.com/ Equivalent URI http://cleanenergysolutions.org/content/project-get-ready-pgr-total-cost-vehicle-ownership-calculator-0, http://cleanenergysolutions.org/content/project-get-ready-pgr-total-cost-vehicle-ownership-calculator References [1] Abstract The calculator allows individuals to consider the purchase cost (including financing) and the fuel cost of electric vehicles compared to conventional vehicles over a lifetime of 15 years. Consumers should also consider driving habits, maintenance costs, insurance, resale value, and potential battery and charging infrastructure costs.

59

Hawaii Gets 'EV Ready' | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Gets 'EV Ready' Gets 'EV Ready' Hawaii Gets 'EV Ready' January 31, 2012 - 11:09am Addthis Last July, Governor Neil Abercrombie unveiled the first public charging station installed in the state capitol’s underground parking garage with the "Hawaii EV Ready" program. In 2011, rebates were approved for 237 electric vehicles and 168 chargers. | Photo courtesy of the Office of the Governor. Last July, Governor Neil Abercrombie unveiled the first public charging station installed in the state capitol's underground parking garage with the "Hawaii EV Ready" program. In 2011, rebates were approved for 237 electric vehicles and 168 chargers. | Photo courtesy of the Office of the Governor. Julie McAlpin Communications Liaison, State Energy Program By 2030, the Hawaii Clean Energy Initiative will:

60

Hawaii Gets 'EV Ready' | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hawaii Gets 'EV Ready' Hawaii Gets 'EV Ready' Hawaii Gets 'EV Ready' January 31, 2012 - 11:09am Addthis Last July, Governor Neil Abercrombie unveiled the first public charging station installed in the state capitol’s underground parking garage with the "Hawaii EV Ready" program. In 2011, rebates were approved for 237 electric vehicles and 168 chargers. | Photo courtesy of the Office of the Governor. Last July, Governor Neil Abercrombie unveiled the first public charging station installed in the state capitol's underground parking garage with the "Hawaii EV Ready" program. In 2011, rebates were approved for 237 electric vehicles and 168 chargers. | Photo courtesy of the Office of the Governor. Julie McAlpin Communications Liaison, State Energy Program

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Technology Readiness Assessments | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Management » Tank Waste and Waste Processing » Waste Management » Tank Waste and Waste Processing » Technology Readiness Assessments Technology Readiness Assessments Documents Available for Download January 1, 2012 Compilation of TRA Summaries A compilation of all TRA Summaries November 1, 2011 Small Column Ion Exchange at Savannah River Site Technology Readiness Assessment Report February 7, 2011 Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 2 (CDP) Full Document and Summary Versions are available for download February 7, 2011 Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP) Full Document and Summary Versions are available for download November 1, 2009 K Basins Sludge Treatment Project Phase 1 Full Document and Summary Versions are available for download

62

Robertsons Ready Mix | Open Energy Information  

Open Energy Info (EERE)

Robertsons Ready Mix Robertsons Ready Mix Jump to: navigation, search Name Robertsons Ready Mix Facility Robertsons Ready Mix Sector Wind energy Facility Type Community Wind Facility Status In Service Owner Foundation Windpower Developer Foundation Windpower Energy Purchaser Robertsons Ready Mix Location Cabazon CA Coordinates 33.915842°, -116.81325° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.915842,"lon":-116.81325,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

63

Planning and Conducting Readiness Reviews  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3006-2010 3006-2010 ________________________ Superseding DOE-STD-3006-2000 June 2000 DOE STANDARD PLANNING AND CONDUCTING READINESS REVIEWS U.S. Department of Energy AREA OPER Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. TS This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. DOE-STD-3006-YR i CONTENTS FOREWORD................................................................................................................................. 1

64

Lightning Arrestor Connectors Production Readiness  

SciTech Connect

The Lightning Arrestor Connector (LAC), part M, presented opportunities to improve the processes used to fabricate LACs. The A## LACs were the first production LACs produced at the KCP, after the product was transferred from Pinnellas. The new LAC relied on the lessons learned from the A## LACs; however, additional improvements were needed to meet the required budget, yield, and schedule requirements. Improvement projects completed since 2001 include Hermetic Connector Sealing Improvement, Contact Assembly molding Improvement, development of a second vendor for LAC shells, general process improvement, tooling improvement, reduction of the LAC production cycle time, and documention of the LAC granule fabrication process. This report summarizes the accomplishments achieved in improving the LAC Production Readiness.

Marten, Steve; Linder, Kim; Emmons, Jim; Gomez, Antonio; Hasam, Dawud; Maurer, Michelle

2008-10-20T23:59:59.000Z

65

Systems security and functional readiness  

SciTech Connect

In Protective Programming Planning, it is important that every facility or installation be configured to support the basic functions and mission of the using organization. This paper addresses the process of identifying the key functional operations of our facilities in Europe and providing the security necessary to keep them operating in natural and man-made threat environments. Functional Readiness is important since many of our existing facilities in Europe were not constructed to meet the demands of today's requirements. There are increased requirements for real-time systems with classified terminals and stringent access control, tempest and other electronic protection devices. One must prioritize the operations of these systems so that essential functions are provided even when the facilities are affected by overt or covert hostile activities.

Bruckner, D.G.

1988-01-01T23:59:59.000Z

66

Guam - Solar-Ready Residential Building Requirement | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar-Ready Residential Building Requirement Guam - Solar-Ready Residential Building Requirement < Back Eligibility Construction Residential Savings Category Heating & Cooling...

67

Preliminary Technology Readiness Assessment (TRA) for the Calcine...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP) Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project...

68

Energy Department Emergency Response Team Ready to Respond to...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department Emergency Response Team Ready to Respond to Hurricane Irene Energy Department Emergency Response Team Ready to Respond to Hurricane Irene August 26, 2011 - 12:15pm...

69

NanoReady Ltd | Open Energy Information  

Open Energy Info (EERE)

NanoReady Ltd NanoReady Ltd Jump to: navigation, search Name NanoReady Ltd Place Caesarea, Israel Zip 38900 Sector Solar Product String representation "NanoReady devel ... nd solar cells." is too long. Coordinates 32.483311°, 34.89521° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.483311,"lon":34.89521,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

70

Modeling Renewable Energy Readiness: The UAE Context  

E-Print Network (OSTI)

Modeling technology policy is becoming an increasingly important capability to steer states and societies toward sustainability. This paper presents a simulation-modeling approach to evaluate renewable energy readiness, ...

Choucri, Nazli

71

Hydrogen Infrastructure Market Readiness Workshop Agenda  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Hydrogen Infrastructure Market Readiness Workshop Agenda Page 1 of 2 NRELDOE Workshop at the Gaylord National, Washington D.C., February 16-17, 2011 Transitioning to an...

72

Energy Efficiency Technology Readiness Guide: 2013 Update  

Science Conference Proceedings (OSTI)

As electric power companies strive to meet increasing end-use energy efficiency requirements, they must make decisions about which technologies seem most promising in terms of availability for wide deployment and providing persistent energy savings while also being cost-effective and likely to be adopted by customers. To help electric power companies with these decisions, EPRI has developed this Technology Readiness Guide to provide a readiness assessment of technologies in various stages of ...

2013-12-23T23:59:59.000Z

73

Readiness Assessment Plan, Hanford 200 areas treated effluent disposal facilities  

SciTech Connect

This Readiness Assessment Plan documents Liquid Effluent Facilities review process used to establish the scope of review, documentation requirements, performance assessment, and plant readiness to begin operation of the Treated Effluent Disposal system in accordance with DOE-RLID-5480.31, Startup and Restart of Facilities Operational Readiness Review and Readiness Assessments.

Ulmer, F.J.

1995-02-06T23:59:59.000Z

74

Automated deduction for verification  

Science Conference Proceedings (OSTI)

Automated deduction uses computation to perform symbolic logical reasoning. It has been a core technology for program verification from the very beginning. Satisfiability solvers for propositional and first-order logic significantly automate the task ...

Natarajan Shankar

2009-10-01T23:59:59.000Z

75

Making automation work  

Science Conference Proceedings (OSTI)

Today's automated systems provide enormous safety and convenience. However, when glitches, problems, or breakdowns occur, the results can be catastrophic.

Samuel Greengard

2009-12-01T23:59:59.000Z

76

Evolution of industrial automation  

Science Conference Proceedings (OSTI)

Automation has been of high priority for the manufacturing sector, from Ford's first set of Model-T Assembly lines in the early 1920s to the modern factory floor. With appropriate automation, the aim was to rationalise the production and keep ... Keywords: Ethernet, architecture, automated manufacturing, bus topology, control servers, distributed control, economies of scale, embedded intelligence, functionality, fuzzy logic, global village, graphic panel, industrial automation, networking, networks

R. Murugesan

2006-03-01T23:59:59.000Z

77

Automated task allocation  

Science Conference Proceedings (OSTI)

The goal of the paradigm shift in Air Traffic Management (ATM) is to increase its overall performance by means of redesigning processes, evolving to a more automated, autonomous and predictable system. Nevertheless, when dealing with automation, it is ... Keywords: ATM, anticipatory, autonomous, centric, compensatory, decision support tools, level of automation, operations research, optimisation, performance metrics, task allocation

Roco Barragn Montes, Eduardo Garca, Francisco Javier Sez Nieto

2013-05-01T23:59:59.000Z

78

FULL-TIME MBA PROGRAM READY TO WORK. READY TO LEAD.  

E-Print Network (OSTI)

FULL-TIME MBA PROGRAM READY TO WORK. READY TO LEAD. MBA@FULLERTON.EDU MBA. T In addition to the four semesters of course work and the Mihaylo Leadership Academy, students in the program.FULLERTON.EDU/FULLTIME (657) 278-3622 he Mihaylo Full-time MBA program answers the calls industry has made of MBA programs

de Lijser, Peter

79

Ready. Aim. Fire. | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ready. Aim. Fire. Ready. Aim. Fire. Ready. Aim. Fire. March 28, 2011 - 4:27pm Addthis John Lippert I wrote in a previous blog posting about using digital electric meters to locate "leaking" electricity-often referred to as phantom loads and vampire loads-and high electrical power consumption. In another posting I described what I'm doing to reach out in my community to get my neighbors to use these meters to locate wasteful electricity usage in their homes. Now my community will have another tool in its arsenal to combat energy waste: a thermal leak detector. Whereas the digital electric meter helps locate electricity leaks, the thermal leak detector helps locate-well, you guessed it-thermal (heat) leaks. Heating and cooling your home account for close to half of the energy use

80

Technology Readiness and the Smart Grid  

Science Conference Proceedings (OSTI)

Technology Readiness Levels (TRLs) originated as a way for the National Aeronautics and Space Administration (NASA) to monitor the development of systems being readied for space. The technique has found wide application as part of the more general topic of system engineering. In this paper, we consider the applicability of TRLs to systems being readied for the smart grid. We find that there are many useful parallels, and much to be gained by this application. However, TRLs were designed for a developer who was also a user. That is not usually the case for smart grid developments. We consider the matter from the point of view of the company responsible for implementation, typically a utility, and we find that there is a need for connecting the many standards in the industry. That connection is explored, and some new considerations are introduced.

Kirkham, Harold; Marinovici, Maria C.

2013-02-27T23:59:59.000Z

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

NHI Component Technical Readiness Evaluation System  

DOE Green Energy (OSTI)

A decision process for evaluating the technical readiness or maturity of components (i.e., heat exchangers, chemical reactors, valves, etc.) for use by the U.S. DOE Nuclear Hydrogen Initiative is described. This system is used by the DOE NHI to assess individual components in relation to their readiness for pilot-scale and larger-scale deployment and to drive the research and development work needed to attain technical maturity. A description of the evaluation system is provided, and examples are given to illustrate how it is used to assist in component R&D decisions.

Steven R. Sherman; Dane F. Wilson; Steven J. Pawel

2007-09-01T23:59:59.000Z

82

Automated Demand Response Opportunities in Wastewater Treatment Facilities  

Science Conference Proceedings (OSTI)

Wastewater treatment is an energy intensive process which, together with water treatment, comprises about three percent of U.S. annual energy use. Yet, since wastewater treatment facilities are often peripheral to major electricity-using industries, they are frequently an overlooked area for automated demand response opportunities. Demand response is a set of actions taken to reduce electric loads when contingencies, such as emergencies or congestion, occur that threaten supply-demand balance, and/or market conditions occur that raise electric supply costs. Demand response programs are designed to improve the reliability of the electric grid and to lower the use of electricity during peak times to reduce the total system costs. Open automated demand response is a set of continuous, open communication signals and systems provided over the Internet to allow facilities to automate their demand response activities without the need for manual actions. Automated demand response strategies can be implemented as an enhanced use of upgraded equipment and facility control strategies installed as energy efficiency measures. Conversely, installation of controls to support automated demand response may result in improved energy efficiency through real-time access to operational data. This paper argues that the implementation of energy efficiency opportunities in wastewater treatment facilities creates a base for achieving successful demand reductions. This paper characterizes energy use and the state of demand response readiness in wastewater treatment facilities and outlines automated demand response opportunities.

Thompson, Lisa; Song, Katherine; Lekov, Alex; McKane, Aimee

2008-11-19T23:59:59.000Z

83

ARE CALIFORNIA SCHOOLS READY FOR THE EXIT EXAM?  

E-Print Network (OSTI)

ARE CALIFORNIA HIGH SCHOOLS READY FOR THE EXIT EXAM?Brief ARE CALIFORNIA HIGH SCHOOLS READY FOR THE EXIT EXAM?HumRRO), that California schools have made great progress in

2005-01-01T23:59:59.000Z

84

An assessment of the value of retail ready packaging  

E-Print Network (OSTI)

Use of retail-ready packaging reduces the costs of replenishing store shelves by eliminating the labor of removing packaging materials and stocking individual items on shelves. While reducing costs for retailers, retail-ready ...

Jackson, Kathleen Anne

2008-01-01T23:59:59.000Z

85

Roundtable on Sustainable Biofuels Certification Readiness Study  

E-Print Network (OSTI)

Roundtable on Sustainable Biofuels Certification Readiness Study: Hawai`i Biofuel Projects Prepared 12.1 Deliverable (item 2) Bioenergy Analyses Prepared by Hawai`i Biofuel Foundation And NCSI Americas: Hawaii Biofuel Projects Prepared For Hawaii Natural Energy Institute School of Ocean Earth Sciences

86

Global e-Readiness - For What? Readiness for e-Banking (JITD)  

E-Print Network (OSTI)

With the rapid diffusion of the Internet worldwide, there has been considerable interest in the e-potentials of developing countries giving rise to a 1st generation of e-Readiness studies. Moreover, ...

Maugis, V.

2004-12-10T23:59:59.000Z

87

CAESAR: Computer Automated Resummations  

E-Print Network (OSTI)

This talk gives a brief discussion of the motivations and principles behind computer automated expert semi-analytical resummation (CAESAR) for QCD final states.

Gavin P. Salam

2004-07-30T23:59:59.000Z

88

Security Automation Developer Days  

Science Conference Proceedings (OSTI)

... not addressed is the actual distribution of standardized ... 3:30 4:45 Automation Content Repositories ... provide protocols for querying devices as to ...

2012-10-26T23:59:59.000Z

89

Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Ethiopia-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Ethiopia UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1]

90

UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) | Open  

Open Energy Info (EERE)

UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Name UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

91

Facilitating Implementation and Readiness for Mitigation (FIRM) | Open  

Open Energy Info (EERE)

Facilitating Implementation and Readiness for Mitigation (FIRM) Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Name UNEP-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Costa Rica, Ethiopia, Ghana, Indonesia, Mexico, Morocco, Senegal, South Africa, Vietnam UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1]

92

Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM)  

Open Energy Info (EERE)

Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM) Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Costa Rica-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Costa Rica UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1]

93

South Africa-Facilitating Implementation and Readiness for Mitigation  

Open Energy Info (EERE)

South Africa-Facilitating Implementation and Readiness for Mitigation South Africa-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: South Africa-Facilitating Implementation and Readiness for Mitigation (FIRM) Name South Africa-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country South Africa UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1]

94

Automated Demand Response and Commissioning  

E-Print Network (OSTI)

Fully-Automated Demand Response Test in Large Facilities14in DR systems. Demand Response using HVAC in Commercialof Fully Automated Demand Response in Large Facilities

Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Bourassa, Norman

2005-01-01T23:59:59.000Z

95

Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness  

NLE Websites -- All DOE Office Websites (Extended Search)

Events Events Printable Version Share this resource Send a link to Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop to someone by E-mail Share Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Facebook Tweet about Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Twitter Bookmark Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Google Bookmark Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Delicious Rank Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on Digg Find More places to share Clean Cities: Plug-In Vehicle and Infrastructure Community Readiness Workshop on AddThis.com... Conferences & Workshops

96

Vehicle Technologies Office: Community and Fleet Readiness  

NLE Websites -- All DOE Office Websites (Extended Search)

Community and Fleet Readiness Community and Fleet Readiness As researchers work to lower the costs and increase the convenience of plug-in electric vehicles (PEVs), it's also necessary to make similar strides on the local level. State and local incentives, such as tax credits or access to HOV lanes, can encourage consumers and vehicle fleets to purchase PEVs. In contrast, difficult permitting procedures for chargers or a lack of signage can discourage adoption. To help communities prepare themselves for plug-in and other alternative fuel vehicles, the Office works with nearly 100 Clean Cities coalitions across the country. Clean Cities offers a wide variety of resources to cities and regions that want to encourage citizens and businesses to drive PEVs. They also offer resources to both public and private fleets that wish to adopt these vehicles.

97

Hydrogen Infrastructure Market Readiness Workshop: Preliminary Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydrogen Infrastructure Market Readiness Hydrogen Infrastructure Market Readiness Workshop: Preliminary Results Marc Melaina, PhD Hydrogen Technologies and Systems Center, NREL Distributed electronically to workshop attendees for review March 24, 2011 Goal of this presentation * This presentation is being disseminated to workshop attendees to convey the aggregate and "raw" feedback collected during the workshop * This feedback will be compiled in a final report * We would like to accomplish two things with these slides: 1. Share the preliminary results with participants 2. Get your feedback now on any corrections or omissions * We are still open to receiving additional feedback on the workshop topic, but will report it as having been received outside of the workshop if it is included in the final report

98

NGNP Infrastructure Readiness Assessment: Consolidation Report  

SciTech Connect

The Next Generation Nuclear Plant (NGNP) project supports the development, demonstration, and deployment of high temperature gas-cooled reactors (HTGRs). The NGNP project is being reviewed by the Nuclear Energy Advisory Council (NEAC) to provide input to the DOE, who will make a recommendation to the Secretary of Energy, whether or not to continue with Phase 2 of the NGNP project. The NEAC review will be based on, in part, the infrastructure readiness assessment, which is an assessment of industry's current ability to provide specified components for the FOAK NGNP, meet quality assurance requirements, transport components, have the necessary workforce in place, and have the necessary construction capabilities. AREVA and Westinghouse were contracted to perform independent assessments of industry's capabilities because of their experience with nuclear supply chains, which is a result of their experiences with the EPR and AP-1000 reactors. Both vendors produced infrastructure readiness assessment reports that identified key components and categorized these components into three groups based on their ability to be deployed in the FOAK plant. The NGNP project has several programs that are developing key components and capabilities. For these components, the NGNP project have provided input to properly assess the infrastructure readiness for these components.

Brian K Castle

2011-02-01T23:59:59.000Z

99

Automated Demand Response Today  

Science Conference Proceedings (OSTI)

Demand response (DR) has progressed over recent years beyond manual and semi-automated DR to include growing implementation and experience with fully automated demand response (AutoDR). AutoDR has been shown to be of great value over manual and semi-automated DR because it reduces the need for human interactions and decisions, and it increases the speed and reliability of the response. AutoDR, in turn, has evolved into the specification known as OpenADR v1.0 (California Energy Commission, PIER Program, C...

2012-03-29T23:59:59.000Z

100

Automated Program Description  

E-Print Network (OSTI)

The Programmer's apprentice (PA) is an automated program development tool. The PA depends upon a library of common algorithms (cliches) as the source of its knowledge about programming. The PA uses these cliches to understand ...

Cyphers, D. Scott

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Automated reaction mapping  

Science Conference Proceedings (OSTI)

Automated reaction mapping is a fundamental first step in the analysis of chemical reactions and opens the door to the development of sophisticated chemical kinetic tools. This article formulates the reaction mapping problem as an optimization problem. ... Keywords: Cheminformatics, mechanisms

John D. Crabtree; Dinesh P. Mehta

2009-02-01T23:59:59.000Z

102

Roxboro Integrated Automation Project  

Science Conference Proceedings (OSTI)

EPRI, Carolina Power & Light (CP&L), and ASEA Brown Boveri (ABB) formed an alliance to develop and demonstrate automation technologies at CP&LOs Roxboro Plant. This alliance is governed by a Memorandum of Understanding that allows all parties to share in the success of the products developed, and to contribute to their commercialization. This research project is intended to demonstrate the economic benefits of efficient and useful plant-wide automation technologies for the utility industry. Successful im...

1997-01-12T23:59:59.000Z

103

Development of Technology Readiness Level (TRL) Metrics and Risk Measures  

Science Conference Proceedings (OSTI)

This is an internal project milestone report to document the CCSI Element 7 team's progress on developing Technology Readiness Level (TRL) metrics and risk measures. In this report, we provide a brief overview of the current technology readiness assessment research, document the development of technology readiness levels (TRLs) specific to carbon capture technologies, describe the risk measures and uncertainty quantification approaches used in our research, and conclude by discussing the next steps that the CCSI Task 7 team aims to accomplish.

Engel, David W.; Dalton, Angela C.; Anderson, K. K.; Sivaramakrishnan, Chandrika; Lansing, Carina

2012-10-01T23:59:59.000Z

104

Readiness Issues for Emergency Response Instrumentation  

Science Conference Proceedings (OSTI)

Issues in maintaining readiness of instruments for deployment and use in emergency response situation often differ from those in maintaining instruments for normal operations. Confunding circumstances include use of non-availability of check sources, ensuring instruments are always in calibration and operable, possible use of instruments in different climates, packaging of instrumentation for deployment, transport of instrumentation and check sources, and ensuring users are familiar with instruments. Methods and procedures for addressing these issues are presented. Instrumentation used for survey, in situ measurements, electronic dosimetry, and air conditioning are discussed.

C.A. Riland; D.R. Bowman; R.J. Tighe

1999-03-01T23:59:59.000Z

105

LHCb commissioning and readiness for first data  

E-Print Network (OSTI)

LHCb has been installed by spring 2008, followed by intensive testing and commissioning of the system in order to be ready for first data taking. Despite the horizontal geometry of the LHCb detector it was possible to collect over one million useful cosmic events that allowed a first time alignment of the sub-detectors. Moreover events from beam dumps during the LHC synchronisation tests provided very useful data for further time and spacial alignment of the detector. Here we present an overview of our commissioning activities, the current status and an outlook on the startup in 2009.

Helge Voss; for the LHCb Collaboration

2009-06-08T23:59:59.000Z

106

Certified Sites (Ready! Set! Build!) (Wisconsin) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Certified Sites (Ready! Set! Build!) (Wisconsin) Certified Sites (Ready! Set! Build!) (Wisconsin) Certified Sites (Ready! Set! Build!) (Wisconsin) < Back Eligibility Agricultural Developer General Public/Consumer Institutional Low-Income Residential Nonprofit Residential Rural Electric Cooperative Schools State/Provincial Govt Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Wisconsin Program Type Training/Technical Assistance Siting and Permitting Provider Wisconsin Economic Development Corporation WEDC has created, in partnership with Deloitte Consulting (Site Selector Consultant) and community partners, the Ready! Set! Build! Program, which provides consistent standards for industrial site certification in

107

The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

for Market Readiness (PMR) for Market Readiness (PMR) Jump to: navigation, search Logo: The World Bank Partnership for Market Readiness (PMR) - Brazil Name The World Bank Partnership for Market Readiness (PMR) - Brazil Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs Website http://wbcarbonfinance.org/Rou

108

READY-TO-SIGN NONEXCLUSIVE PATENT LICENSE AGREEMENT  

Bullet Detection Tracking and Stopping System Company Name 1/7 TL0_____ Date READY-TO-SIGN NONEXCLUSIVE . PATENT LICENSE AGREEMENT . This license agreement ...

109

NETL: News Release - Industry Ready to Join President's Clean...  

NLE Websites -- All DOE Office Websites (Extended Search)

August 27, 2002 Industry Ready to Join President's Clean Coal Initiative Opening Round of Clean Coal Competition Attracts 36 Proposals Worth 5 Billion Clean Coal Power Initiative...

110

Ready-to-Sign Licensing Instructions - Industrial Partnerships ...  

Ready-to-Sign Licensing Instructions. Read the Notice for RTS License Agreement and complete Commercialization Information Form; Select a technology from the patents ...

111

Georgia Power: Early Experience Shapes Current Action on PEV Readiness  

Science Conference Proceedings (OSTI)

This case study focuses on one of Georgia Power's top PEV-readiness priorities: developing and implementing a time-of-use (TOU) rate for PEV charging.

2013-11-05T23:59:59.000Z

112

NREL: News - NREL Helps Communities Assess Their Readiness for...  

NLE Websites -- All DOE Office Websites (Extended Search)

progress along the way. Available online at DOE's Alternative Fuels Data Center (www.afdc.energy.govpev-readiness), the PEV Scorecard walks users through a variety of PEV...

113

Technology Readiness Assessment (TRA)/Technology Maturation Plan...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(TRA)Technology Maturation Plan (TMP) Process Guide Technology Readiness Assessment (TRA)Technology Maturation Plan (TMP) Process Guide This document is a guide for those...

114

Technology Readiness Levels for the DOE Description TRL 2.  

Scientific research begins translation to applied R&D - Lowest level of technology readiness. Scientific research begins to be translated into applied research and

115

Saving Energy in Ready Mixed Concrete Production: An ENERGY STAR...  

NLE Websites -- All DOE Office Websites (Extended Search)

Saving Energy in Ready Mixed Concrete Production: An ENERGY STAR Quick Guide for Managing Energy Secondary menu About us Press room Contact Us Portfolio Manager Login Facility...

116

Automating DNA processing  

E-Print Network (OSTI)

Technology is currently available to identify the genetic codes responsible for physical traits and genetic diseases in both plants and animals. Regardless of whether the final goal is medical diagnosis or breeder selection, extensive time and resources must be spent in laboratory research to determine the genetic structure of the relevant organisms. DNA processing is riddled with time intensive laboratory techniques that must be improved or replaced if genotyping large numbers of samples is to be accomplished. This thesis identifies and explains modules in DNA processing and how they can be improved by automation. modules associated with genome mapping are the focus of most of the discussion. A functional biochemistry background is provided so that researchers in automation can be efficiently assimilated to future biochen-fistry/automation projects. The needs of biochemistry researchers at Texas A&M University are specifically addressed. Herein, DNA processing has been defined as a series of discrete sub-processes or process modules in order to aid scheduling of future automation projects. Target process modules (sub-processes with a high probability of automation success) have been identified. In addition, possible automation solutions have been proposed for each target module along with a characterization of fundamental design parameters. Concluding this text is a discussion of procedures in genome mapping that have not been sufficiently automated. The initial focus of this thesis is on short term solutions. However, attention is given to more conceptual solutions accompanied by the biochemistry background necessary to begin developing them. Though systems are proposed to improve the efficiency of many processes, no implementation has been attempted. Design specifications are based on observation of current laboratory techniques and the variance that is typically allowed in relevant process parameters in TAMU laboratories.

Wienen, Michael Jan

1994-01-01T23:59:59.000Z

117

NIF ICCS Test Controller for Automated & Manual Testing  

SciTech Connect

The National Ignition Facility (NIF) Integrated Computer Control System (ICCS) is a large (1.5 MSLOC), hierarchical, distributed system that controls all aspects of the NIF laser [1]. The ICCS team delivers software updates to the NIF facility throughout the year to support shot operations and commissioning activities. In 2006, there were 48 releases of ICCS: 29 full releases, 19 patches. To ensure the quality of each delivery, thousands of manual and automated tests are performed using the ICCS Test Controller test infrastructure. The TestController system provides test inventory management, test planning, automated test execution and manual test logging, release testing summaries and test results search, all through a web browser interface. Automated tests include command line based frameworks server tests and Graphical User Interface (GUI) based Java tests. Manual tests are presented as a checklist-style web form to be completed by the tester. The results of all tests, automated and manual, are kept in a common repository that provides data to dynamic status reports. As part of the 3-stage ICCS release testing strategy, the TestController system helps plan, evaluate and track the readiness of each release to the NIF facility.

Zielinski, J S

2007-10-03T23:59:59.000Z

118

MCSE: Microsoft Windows 2000 Core Exam Set Readiness Review  

Science Conference Proceedings (OSTI)

From the Publisher:Test your readiness for core MCSE Exams 70-210, 70-215, 70-216, and 70-217 with this all-in-one set! With the Readiness Review core exam set including a companion CD, candidates of certification in Windows 2000 can sharpen their ...

Microsoft Corporation

2001-03-01T23:59:59.000Z

119

Capture-ready power plants : options, technologies and economics  

E-Print Network (OSTI)

A plant can be considered to be capture-ready if, at some point in the future it can be retrofitted for carbon capture and sequestration and still be economical to operate. The concept of capture-ready is not a specific ...

Bohm, Mark (Mark C.)

2006-01-01T23:59:59.000Z

120

Automated software engineering: supporting understanding  

Science Conference Proceedings (OSTI)

The most important role for automation in software engineering is the support of human understanding. Some aspects of understanding and how it can be supported are discussed. Keywords: Automation, Complexity, Description, Fragmentation, Manipulation, Mechanisation

Michael Jackson

2008-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Morocco-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Morocco UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

122

EM Performs Tenth Technology Readiness Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Performs Tenth Technology Readiness Assessment Performs Tenth Technology Readiness Assessment EM Performs Tenth Technology Readiness Assessment January 31, 2012 - 12:00pm Addthis Employees with Savannah River Remediation, the SRS liquid waste contractor, review mock-ups of the SCIX technology at the Savannah River National Laboratory. Employees with Savannah River Remediation, the SRS liquid waste contractor, review mock-ups of the SCIX technology at the Savannah River National Laboratory. WASHINGTON, D.C. - EM recently completed its tenth Technology Readiness Assessment (TRA) since piloting the TRA process in 2006. A TRA is an intensive peer review process through which the maturity of a technology is evaluated. A TRA utilizes the Technology Readiness Level (TRL) scale pioneered by the National Aeronautics and Space Administration

123

Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Vietnam-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Vietnam UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

124

EM Performs Tenth Technology Readiness Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Performs Tenth Technology Readiness Assessment EM Performs Tenth Technology Readiness Assessment EM Performs Tenth Technology Readiness Assessment January 31, 2012 - 12:00pm Addthis Employees with Savannah River Remediation, the SRS liquid waste contractor, review mock-ups of the SCIX technology at the Savannah River National Laboratory. Employees with Savannah River Remediation, the SRS liquid waste contractor, review mock-ups of the SCIX technology at the Savannah River National Laboratory. WASHINGTON, D.C. - EM recently completed its tenth Technology Readiness Assessment (TRA) since piloting the TRA process in 2006. A TRA is an intensive peer review process through which the maturity of a technology is evaluated. A TRA utilizes the Technology Readiness Level (TRL) scale pioneered by the National Aeronautics and Space Administration

125

What's Your PEV Readiness Score? | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

What's Your PEV Readiness Score? What's Your PEV Readiness Score? What's Your PEV Readiness Score? February 14, 2013 - 10:30am Addthis PEV readiness is a community-wide effort that requires charging infrastructure, planning, regulations and support services. The new PEV Scorecard helps communities determine their PEV friendliness. | Photo courtesy of IKEA Orlando. PEV readiness is a community-wide effort that requires charging infrastructure, planning, regulations and support services. The new PEV Scorecard helps communities determine their PEV friendliness. | Photo courtesy of IKEA Orlando. Shannon Brescher Shea Communications Manager, Clean Cities Program What does this project do? Clean Cities works to reduce U.S. reliance on petroleum in transportation by establishing local coalitions of public- and

126

Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Ghana-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Ghana UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

127

Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) |  

Open Energy Info (EERE)

Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) Jump to: navigation, search Logo: Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) Name Mexico-Facilitating Implementation and Readiness for Mitigation (FIRM) Agency/Company /Organization United Nations Environment Programme (UNEP) Partner Global Environment Facility (GEF), Government of Denmark Sector Climate, Energy, Land Topics Adaptation, Co-benefits assessment, - Environmental and Biodiversity, Finance, Implementation, Low emission development planning Website http://www.unep.org/climatecha Program Start 2011 Program End 2013 Country Mexico UN Region Central America References Facilitating Implementation and Readiness for Mitigation (FIRM)[1] "The Government of Denmark will provide US$6 million to the new programme

128

Rough and Ready Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

and Ready Biomass Facility and Ready Biomass Facility Jump to: navigation, search Name Rough and Ready Biomass Facility Facility Rough and Ready Sector Biomass Owner Rough and Ready Lumber Co. Location Cave Junction, Oregon Coordinates 42.1628912°, -123.6481235° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.1628912,"lon":-123.6481235,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

129

Automated Transportation Management System (ATMS) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Management Packaging and Transportation Automated Transportation Management System (ATMS) Automated Transportation Management System (ATMS) The Department of Energy's...

130

Automated Demand Response and Commissioning  

E-Print Network (OSTI)

internal conditions. Maximum Demand Saving Intensity [W/ft2]automated electric demand sheds. The maximum electric shed

Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Bourassa, Norman

2005-01-01T23:59:59.000Z

131

Portable Automated Mesonet II  

Science Conference Proceedings (OSTI)

The Portable Automated Mesonet II (PAM II) system was developed by NCAR to provide surface mesoscale data for the research needs of the atmospheric science community. The PAM system has 60 remote stations with planned growth to 300. In such a ...

Fred V. Brock; George H. Saum; Steven R. Semmer

1986-12-01T23:59:59.000Z

132

Terminal automation system maintenance  

SciTech Connect

Nothing has improved petroleum product loading in recent years more than terminal automation systems. The presence of terminal automation systems (TAS) at loading racks has increased operational efficiency and safety and enhanced their accounting and management capabilities. However, like all finite systems, they occasionally malfunction or fail. Proper servicing and maintenance can minimize this. And in the unlikely event a TAS breakdown does occur, prompt and effective troubleshooting can reduce its impact on terminal productivity. To accommodate around-the-clock loading at racks, increasingly unattended by terminal personnel, TAS maintenance, servicing and troubleshooting has become increasingly demanding. It has also become increasingly important. After 15 years of trial and error at petroleum and petrochemical storage and transfer terminals, a number of successful troubleshooting programs have been developed. These include 24-hour {open_quotes}help hotlines,{close_quotes} internal (terminal company) and external (supplier) support staff, and {open_quotes}layered{close_quotes} support. These programs are described.

Coffelt, D.; Hewitt, J. [Engineered Systems Inc., Tempe, AZ (United States)

1997-01-01T23:59:59.000Z

133

Automated gas chromatography  

DOE Patents (OSTI)

An apparatus and process for the continuous, near real-time monitoring of low-level concentrations of organic compounds in a liquid, and, more particularly, a water stream. A small liquid volume of flow from a liquid process stream containing organic compounds is diverted by an automated process to a heated vaporization capillary where the liquid volume is vaporized to a gas that flows to an automated gas chromatograph separation column to chromatographically separate the organic compounds. Organic compounds are detected and the information transmitted to a control system for use in process control. Concentrations of organic compounds less than one part per million are detected in less than one minute. 7 figs.

Mowry, C.D.; Blair, D.S.; Rodacy, P.J.; Reber, S.D.

1999-07-13T23:59:59.000Z

134

Automated Demand Response Tests  

Science Conference Proceedings (OSTI)

This report includes assessments and test results of four end-use technologies, representing products in the residential, commercial, and industrial sectors, each configured to automatically receive real-time pricing information and critical peak pricing (CPP) demand response (DR) event notifications. Four different vendors were asked to follow the interface requirements set forth in the Open Automated Demand Response (OpenADR) standard that was introduced to the public in 2008 and currently used in two ...

2008-12-22T23:59:59.000Z

135

Automated Demand Response Tests  

Science Conference Proceedings (OSTI)

This report, which is an update to EPRI Report 1016082, includes assessments and test results of four end-use vendor technologies. These technologies represent products in the residential, commercial, and industrial sectors, each configured to automatically receive real-time pricing information and critical peak pricing (CPP) demand response (DR) event notifications. Four different vendors were asked to follow the interface requirements set forth in the Open Automated Demand Response (OpenADR) Communicat...

2009-03-30T23:59:59.000Z

136

LWRS ATR Irradiation Testing Readiness Status  

SciTech Connect

The Light Water Reactor Sustainability (LWRS) Program was established by the U.S. Department of Energy Office of Nuclear Energy (DOE-NE) to develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors. The LWRS Program is divided into four R&D Pathways: (1) Materials Aging and Degradation; (2) Advanced Light Water Reactor Nuclear Fuels; (3) Advanced Instrumentation, Information and Control Systems; and (4) Risk-Informed Safety Margin Characterization. This report describes an irradiation testing readiness analysis in preparation of LWRS experiments for irradiation testing at the Idaho National Laboratory (INL) Advanced Test Reactor (ATR) under Pathway (2). The focus of the Advanced LWR Nuclear Fuels Pathway is to improve the scientific knowledge basis for understanding and predicting fundamental performance of advanced nuclear fuel and cladding in nuclear power plants during both nominal and off-nominal conditions. This information will be applied in the design and development of high-performance, high burn-up fuels with improved safety, cladding integrity, and improved nuclear fuel cycle economics

Kristine Barrett

2012-09-01T23:59:59.000Z

137

Software Technology Readiness for the Smart Grid  

Science Conference Proceedings (OSTI)

Abstract Budget and schedule overruns in product development due to the use of immature technologies constitute an important matter for program managers. Moreover, unexpected lack of technology maturity is also a problem for buyers. Both sides of the situation would benefit from an unbiased measure of technology maturity. This paper presents the use of a software maturity metric called Technology Readiness Level (TRL), in the milieu of the smart grid. For most of the time they have been in existence, power utilities have been protected monopolies, guaranteed a return on investment on anything they could justify adding to the rate base. Such a situation did not encourage innovation, and instead led to widespread risk-avoidance behavior in many utilities. The situation changed at the end of the last century, with a series of regulatory measures, beginning with the Public Utility Regulatory Policy Act of 1978. However, some bad experiences have actually served to strengthen the resistance to innovation by some utilities. Some aspects of the smart grid, such as the addition of computer-based control to the power system, face an uphill battle. It is our position that the addition of TRLs to the decision-making process for smart grid power-system projects, will lead to an environment of more confident adoption.

Tugurlan, Maria C.; Kirkham, Harold; Chassin, David P.

2011-06-13T23:59:59.000Z

138

Property:Technology Readiness Level | Open Energy Information  

Open Energy Info (EERE)

Readiness Level Readiness Level Jump to: navigation, search Property Name Technology Readiness Level Property Type Text Pages using the property "Technology Readiness Level" Showing 25 pages using this property. (previous 25) (next 25) M MHK Technologies/14 MW OTECPOWER + TRL 5 6 System Integration and Technology Laboratory Demonstration MHK Technologies/Aegir Dynamo + TRL 5 6 System Integration and Technology Laboratory Demonstration MHK Technologies/AirWEC + TRL 5/6: System Integration and Technology Laboratory Demonstration MHK Technologies/Anaconda bulge tube drives turbine + TRL 4 Proof of Concept MHK Technologies/AquaBuoy + TRL 1-3: Discovery / Concept Definition / Early Stage Development & Design & Engineering MHK Technologies/Aquantis + TRL 1 3 Discovery Concept Def Early Stage Dev Design Engineering

139

Energy Department Staff Ready for Hurricane Earl | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department Staff Ready for Hurricane Earl Energy Department Staff Ready for Hurricane Earl Energy Department Staff Ready for Hurricane Earl September 3, 2010 - 12:00pm Addthis Patricia A. Hoffman Patricia A. Hoffman Assistant Secretary, Office of Electricity Delivery & Energy Reliability What does this mean for me? You can review updated information on the Energy Department's response efforts, including critical energy infrastructure impacted by the storm and outage and restoration data, through the Emergency Situation Reports. As Category 4 Hurricane Earl heads towards the East Coast, Energy Department emergency responders are in place and ready to go at the National Response Coordination Center in Washington, D.C. and FEMA's Regional Response Coordination Centers in Boston and New York City. The

140

Ghana-REDD Readiness Requires Radical Reform | Open Energy Information  

Open Energy Info (EERE)

Readiness Requires Radical Reform Readiness Requires Radical Reform Jump to: navigation, search Name Ghana-REDD Readiness Requires Radical Reform Agency/Company /Organization UN-REDD Programme Sector Land Focus Area Forestry, Agriculture Topics Implementation, GHG inventory, Policies/deployment programs, Resource assessment, Pathways analysis, Background analysis Resource Type Maps, Guide/manual, Training materials Website http://environment.yale.edu/tf Country Ghana UN Region Western Africa References Ghana-REDD Readiness[1] Summary "The fundamental changes needed for sustainable forest management in Ghana have been known for years, and many large projects have been instigated accordingly. Yet real change has proved elusive. The key challenge now is to get REDD-plus right so that it makes a difference. Dialogue participants

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

TJ Automation | Open Energy Information  

Open Energy Info (EERE)

TJ Automation TJ Automation Jump to: navigation, search Name TJ Automation Facility TJ Automation Sector Wind energy Facility Type Small Scale Wind Facility Status In Service Owner TJ Automation Energy Purchaser TJ Automation Location Archbold OH Coordinates 41.45823855°, -84.30666804° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.45823855,"lon":-84.30666804,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

142

Automated Demand Response and Commissioning  

NLE Websites -- All DOE Office Websites (Extended Search)

and Commissioning Title Automated Demand Response and Commissioning Publication Type Conference Paper LBNL Report Number LBNL-57384 Year of Publication 2005 Authors Piette, Mary...

143

Automated Centrifugal Chiller Diagnostician - Available ...  

Summary. Researchers and engineers at PNNL have developed an automated, sophisticated, multi-level, real-time centrifugal chiller diagnostician with ...

144

Automated fiber pigtailing machine  

DOE Patents (OSTI)

The Automated Fiber Pigtailing Machine (AFPM) aligns and attaches optical fibers to optoelectronic (OE) devices such as laser diodes, photodiodes, and waveguide devices without operator intervention. The so-called pigtailing process is completed with sub-micron accuracies in less than 3 minutes. The AFPM operates unattended for one hour, is modular in design and is compatible with a mass production manufacturing environment. This machine can be used to build components which are used in military aircraft navigation systems, computer systems, communications systems and in the construction of diagnostics and experimental systems. 26 figs.

Strand, O.T.; Lowry, M.E.

1999-01-05T23:59:59.000Z

145

Installation and Commissioning Automated Demand Response Systems  

E-Print Network (OSTI)

al: Installation and Commissioning Automated Demand ResponseConference on Building Commissioning: April 22 24, 2008al: Installation and Commissioning Automated Demand Response

Kiliccote, Sila; Global Energy Partners; Pacific Gas and Electric Company

2008-01-01T23:59:59.000Z

146

Automation Alley Technology Center | Open Energy Information  

Open Energy Info (EERE)

Automation Alley Technology Center Jump to: navigation, search Name Automation Alley Technology Center Place United States Sector Services Product General Financial & Legal...

147

Installation and Commissioning Automated Demand Response Systems  

E-Print Network (OSTI)

their partnership in demand response automation research andand Techniques for Demand Response. LBNL Report 59975. Mayof Fully Automated Demand Response in Large Facilities.

Kiliccote, Sila; Global Energy Partners; Pacific Gas and Electric Company

2008-01-01T23:59:59.000Z

148

Rockwell Automation - Owens Corning Teaming Profile  

NLE Websites -- All DOE Office Websites (Extended Search)

Rockwell Automation programmable automation controller to collect data on motor kilowatts, speed, and torque. Project Summary By using real time data collected by the...

149

Building Technologies Office: Automated Home Energy Management...  

NLE Websites -- All DOE Office Websites (Extended Search)

Home Area Network Trends SmartGridCity(tm) Integration with Home Controls Automated HomeEnergy Management Automated Monitoring, Control, Diagnostics, Optimization and Soft Repair...

150

Implementation plan for WRAP Module 1 operational readiness review  

Science Conference Proceedings (OSTI)

The Waste Receiving and Processing Module 1 (WRAP 1) will be used to receive, sample, treat, and ship contact-handled (CH) transuranic (TRU), low-level waste (LLW), and low-level mixed waste (LLMW) to storage and disposal sites both on the Hanford site and off-site. The primary mission of WRAP 1 is to characterize and certify CH waste in 55-gallon and 85-gallon drums; and its secondary function is to certify CH waste standard waste boxes (SWB) and boxes of similar size for disposal. The WRAP 1 will provide the capability for examination (including x-ray, visual, and contents sampling), limited treatment, repackaging, and certification of CH suspect-TRU waste in 55-gallon drums retrieved from storage, as well as newly generated CH LLW and CH TRU waste drums. The WRAP 1 will also provide examination (X-ray and visual only) and certification of CH LLW and CH TRU waste in small boxes. The decision to perform an Operational Readiness Review (ORR) was made in accordance with WHC-CM-5-34, Solid Waste Disposal Operations Administration, Section 1.4, Operational Readiness Activities. The ORR will ensure plant and equipment readiness, management and personnel readiness, and management programs readiness for the initial startup of the facility. This implementation plan is provided for defining the conduct of the WHC ORR.

Irons, L.G.

1994-11-04T23:59:59.000Z

151

Automating the analytical laboratory via the Chemical Analysis Automation paradigm  

Science Conference Proceedings (OSTI)

To address the need for standardization within the analytical chemistry laboratories of the nation, the Chemical Analysis Automation (CAA) program within the US Department of Energy, Office of Science and Technology`s Robotic Technology Development Program is developing laboratory sample analysis systems that will automate the environmental chemical laboratories. The current laboratory automation paradigm consists of islands-of-automation that do not integrate into a system architecture. Thus, today the chemist must perform most aspects of environmental analysis manually using instrumentation that generally cannot communicate with other devices in the laboratory. CAA is working towards a standardized and modular approach to laboratory automation based upon the Standard Analysis Method (SAM) architecture. Each SAM system automates a complete chemical method. The building block of a SAM is known as the Standard Laboratory Module (SLM). The SLM, either hardware or software, automates a subprotocol of an analysis method and can operate as a standalone or as a unit within a SAM. The CAA concept allows the chemist to easily assemble an automated analysis system, from sample extraction through data interpretation, using standardized SLMs without the worry of hardware or software incompatibility or the necessity of generating complicated control programs. A Task Sequence Controller (TSC) software program schedules and monitors the individual tasks to be performed by each SLM configured within a SAM. The chemist interfaces with the operation of the TSC through the Human Computer Interface (HCI), a logical, icon-driven graphical user interface. The CAA paradigm has successfully been applied in automating EPA SW-846 Methods 3541/3620/8081 for the analysis of PCBs in a soil matrix utilizing commercially available equipment in tandem with SLMs constructed by CAA.

Hollen, R.; Rzeszutko, C.

1997-10-01T23:59:59.000Z

152

Are You Ready for Fall? | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Are You Ready for Fall? Are You Ready for Fall? Are You Ready for Fall? October 21, 2011 - 6:38am Addthis This week, Andrea talked about insulating her water heater tank in preparation for cooler weather (of course, that's something you can do any time of year to save money and energy at home). She also listed many other ways to reduce your water heating costs. Erin blogged about something we don't often think about: the historical perspective of using renewable energy. For example, Leonardo da Vinci had designed a solar powered water heater among other things. As for geothermal energy, archaeological evidence shows that the first human use of geothermal resources in North America occurred more than 10,000 years ago. Whether you're using renewables or energy efficiency (or both), what are

153

Ready to Retrofit: The Process of Project Team Selection, Building  

NLE Websites -- All DOE Office Websites (Extended Search)

Ready to Retrofit: The Process of Project Team Selection, Building Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects Title Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects Publication Type Report LBNL Report Number LBNL-5893E Year of Publication 2012 Authors Sanders, Mark D., Kristen Parrish, and Paul A. Mathew Publisher LBNL Abstract This guide provides an introduction and overview to the retrofit process and then dives deeper into the key activities that an owner can influence most in the retrofit process: (1) Selecting Your Project Team, (2) Benchmarking Your Building, and (3) Financing Your Energy Efficiency Projects* Building Energy Retrofit Overview will provide you a simple explanation of the retrofit process, the project stages and the players involved.

154

REDD+ Country Readiness Preparation Proposals | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » REDD+ Country Readiness Preparation Proposals Jump to: navigation, search Tool Summary LAUNCH TOOL Name: REDD+ Country Readiness Preparation Proposals Agency/Company /Organization: World Resources Institute Focus Area: Forestry Topics: Implementation, Policies/deployment programs, Pathways analysis Resource Type: Publications, Guide/manual Website: www.wri.org/publication/getting-ready Country: Democratic Republic of Congo, Ghana, Guyana, Indonesia, Madagascar, Mexico, Suriname, Panama Middle Africa, Western Africa, South America, South-Eastern Asia, Eastern Africa, Central America, South America, Central America

155

SRS Tank 48H Waste Treatment Project Technology Readiness Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Tank 48H Savannah River Site Tank 48H Waste Treatment Project Technology Readiness Assessment Harry D. Harmon Joan B. Berkowitz John C. DeVine, Jr. Herbert G. Sutter Joan K. Young SPD-07-195 July 31, 2007 Prepared by the U.S. Department of Energy Aiken, South Carolina SRS Tank 48H Waste Treatment Project SPD-07-195 Technology Readiness Assessment July 31, 2007 Signature Page 7/31/07 ___________________________ _________________________ John C. DeVine, Jr., Team Member Date SRS Tank 48H Waste Treatment Project SPD-07-195 Technology Readiness Assessment July 31, 2007 Executive Summary The purpose of this assessment was to determine the technology maturity level of the candidate Tank 48H treatment technologies that are being considered for implementation at DOE's

156

Training Program Graduates Weatherization-Ready Workers | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Program Graduates Weatherization-Ready Workers Training Program Graduates Weatherization-Ready Workers Training Program Graduates Weatherization-Ready Workers April 29, 2010 - 5:45pm Addthis Daniel Tello demonstrates how to prepare an attic space for insulation using skills learned from the First Choice Program. | Photo courtesy of HCDC, Human Capital Development Corp., Inc. and Scott Anderson Daniel Tello demonstrates how to prepare an attic space for insulation using skills learned from the First Choice Program. | Photo courtesy of HCDC, Human Capital Development Corp., Inc. and Scott Anderson Lindsay Gsell On graduation day, students at Human Capital Development Corp., Inc. (HCDC) leave with more than just a diploma. They receive a hard hat, tool belt, hammer, utility knife and a tape measure. Graduates from Racine, Wis.-based HCDC First Choice Program are literally

157

LEDs Ready for Takeoff at Louisiana Airport | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LEDs Ready for Takeoff at Louisiana Airport LEDs Ready for Takeoff at Louisiana Airport LEDs Ready for Takeoff at Louisiana Airport July 14, 2010 - 3:34pm Addthis Hammond, La., airport is replacing the existing incandescent taxiway lights (pictured) with LEDs. | Photo courtesy of Hammond Northshore Regional Airport Hammond, La., airport is replacing the existing incandescent taxiway lights (pictured) with LEDs. | Photo courtesy of Hammond Northshore Regional Airport Stephen Graff Former Writer & editor for Energy Empowers, EERE What are the key facts? Upgrades for safety, energy at Hammond airport possible through Recovery Act Taxiway lights to be replaced with LEDs Airport could save up to $15,000 annually on electric bills Energy efficiency is taking off at the airport in Hammond, La., about 70

158

Fast pandemic detection tool ready to fight flu  

NLE Websites -- All DOE Office Websites (Extended Search)

Fast pandemic detection tool ready to fight flu Fast pandemic detection tool ready to fight flu Fast pandemic detection tool ready to fight flu Researchers are developing new tools for rapidly characterizing biological pathogens that could give rise to potentially deadly pandemics such as Influenza A (H1N1). June 9, 2009 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

159

Launching Apps for Energy! Developers, Are You Ready? | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Apps for Energy! Developers, Are You Ready? Apps for Energy! Developers, Are You Ready? Launching Apps for Energy! Developers, Are You Ready? April 5, 2012 - 4:00pm Addthis Apps for Energy is open for submissions. Sign-up at appsforenergy.challenge.gov. Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs What are the key facts? Today, the Energy Department's Apps for Energy competition is open for submissions. Apps for Energy leverages Green Button -- an open standard for sharing utility data. Developers who build the best apps win part of a $100,000 cash prize. May 15 is the last day to submit an app. To submit your app design, signup at appsforenergy.challenge.gov The Energy Department's first ever Apps for Energy competition is officially open for submissions, starting today.

160

LEDs Ready for Takeoff at Louisiana Airport | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LEDs Ready for Takeoff at Louisiana Airport LEDs Ready for Takeoff at Louisiana Airport LEDs Ready for Takeoff at Louisiana Airport July 14, 2010 - 3:34pm Addthis Hammond, La., airport is replacing the existing incandescent taxiway lights (pictured) with LEDs. | Photo courtesy of Hammond Northshore Regional Airport Hammond, La., airport is replacing the existing incandescent taxiway lights (pictured) with LEDs. | Photo courtesy of Hammond Northshore Regional Airport Stephen Graff Former Writer & editor for Energy Empowers, EERE What are the key facts? Upgrades for safety, energy at Hammond airport possible through Recovery Act Taxiway lights to be replaced with LEDs Airport could save up to $15,000 annually on electric bills Energy efficiency is taking off at the airport in Hammond, La., about 70

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

UNDP Readiness for Climate Finance | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » UNDP Readiness for Climate Finance Jump to: navigation, search Tool Summary Name: UNDP Readiness for Climate Finance Agency/Company /Organization: United Nations Development Programme (UNDP) Sector: Climate Focus Area: Renewable Energy Phase: Evaluate Options Topics: Co-benefits assessment, - Energy Access, Finance, Low emission development planning, -LEDS Resource Type: Guide/manual, Publications Website: www.undp.org/content/undp/en/home/librarypage/environment-energy/low_e Cost: Free Language: English The paper presents a framework for understanding what it means to be "ready" to use climate finance in a transformative way at the national level. In the context of the financial challenges posed by climate change,

162

Are You Ready to Make a Difference? | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Are You Ready to Make a Difference? Are You Ready to Make a Difference? Are You Ready to Make a Difference? September 27, 2010 - 2:23pm Addthis Secretary of Energy Steven Chu talks about the influence of his physics teacher. John Schueler John Schueler Former New Media Specialist, Office of Public Affairs Providing America's students with a quality education is essential to ensuring that we can continue to be leaders of innovation and industry, and we can't fulfill that responsibility without quality teachers. There is already a great need for skilled math and science teachers and with many of the most accomplished educators approaching retirement age, the demand for specialists in those fields will only grow in the coming years. That's why public figures like Secretary Chu are sharing the personal impact that

163

Energy Department Emergency Response Team Ready to Respond to Hurricane  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department Emergency Response Team Ready to Respond to Department Emergency Response Team Ready to Respond to Hurricane Irene Energy Department Emergency Response Team Ready to Respond to Hurricane Irene August 26, 2011 - 12:15pm Addthis Hurricane Irene made landfall at approximately 7:30 am EDT near Cape Lookout, North Carolina with maximum sustained winds of 85 mph (Category 1). This NOAA GOES-13 satellite image captures Irene’s landfall moment. | Image courtesy of NOAA Hurricane Irene made landfall at approximately 7:30 am EDT near Cape Lookout, North Carolina with maximum sustained winds of 85 mph (Category 1). This NOAA GOES-13 satellite image captures Irene's landfall moment. | Image courtesy of NOAA Patricia A. Hoffman Patricia A. Hoffman Assistant Secretary, Office of Electricity Delivery & Energy Reliability

164

Are You Ready for Fall? | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Are You Ready for Fall? Are You Ready for Fall? Are You Ready for Fall? October 21, 2011 - 6:38am Addthis This week, Andrea talked about insulating her water heater tank in preparation for cooler weather (of course, that's something you can do any time of year to save money and energy at home). She also listed many other ways to reduce your water heating costs. Erin blogged about something we don't often think about: the historical perspective of using renewable energy. For example, Leonardo da Vinci had designed a solar powered water heater among other things. As for geothermal energy, archaeological evidence shows that the first human use of geothermal resources in North America occurred more than 10,000 years ago. Whether you're using renewables or energy efficiency (or both), what are

165

Robust automated knowledge capture.  

SciTech Connect

This report summarizes research conducted through the Sandia National Laboratories Robust Automated Knowledge Capture Laboratory Directed Research and Development project. The objective of this project was to advance scientific understanding of the influence of individual cognitive attributes on decision making. The project has developed a quantitative model known as RumRunner that has proven effective in predicting the propensity of an individual to shift strategies on the basis of task and experience related parameters. Three separate studies are described which have validated the basic RumRunner model. This work provides a basis for better understanding human decision making in high consequent national security applications, and in particular, the individual characteristics that underlie adaptive thinking.

Stevens-Adams, Susan Marie; Abbott, Robert G.; Forsythe, James Chris; Trumbo, Michael Christopher Stefan; Haass, Michael Joseph; Hendrickson, Stacey M. Langfitt

2011-10-01T23:59:59.000Z

166

Berkeley automated supernova search  

SciTech Connect

The Berkeley automated supernova search employs a computer controlled 36-inch telescope and charge coupled device (CCD) detector to image 2500 galaxies per night. A dedicated minicomputer compares each galaxy image with stored reference data to identify supernovae in real time. The threshold for detection is m/sub v/ = 18.8. We plan to monitor roughly 500 galaxies in Virgo and closer every night, and an additional 6000 galaxies out to 70 Mpc on a three night cycle. This should yield very early detection of several supernovae per year for detailed study, and reliable premaximum detection of roughly 100 supernovae per year for statistical studies. The search should be operational in mid-1982.

Kare, J.T.; Pennypacker, C.R.; Muller, R.A.; Mast, T.S.; Crawford, F.S.; Burns, M.S.

1981-01-01T23:59:59.000Z

167

Tank Waste Feed Delivery System Readiness at the Hanford Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Audit Report Audit Report Tank Waste Feed Delivery System Readiness at the Hanford Site OAS-L-12-09 August 2012 Department of Energy Washington, DC 20585 August 23, 2012 MEMORANDUM FOR THE MANAGER, OFFICE OF RIVER PROTECTION FROM: David Sedillo, Director Western Audits Division Office of Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Tank Waste Feed Delivery System Readiness at the Hanford Site" BACKGROUND The Department of Energy's largest cleanup task involves the treatment, immobilization and disposal of 56 million gallons of hazardous and highly radioactive waste at the Hanford Site, located in Southeastern Washington State. As part of this effort, the Department is constructing

168

Enabling Demand-Response-Ready Appliances and Devices  

Science Conference Proceedings (OSTI)

This Technical Update reports on the results of a 2010 Electric Power Research Institute (EPRI) survey of utilities that was performed as part of a multi-year effort to develop functional specifications for residential demand-response- (DR-) ready appliances and devices. This report also provides an update of industry trends and smart appliance development. DR-ready appliances and devices are defined as those that are able to participate in demand-response programs out of the box. Such devices can receiv...

2011-03-30T23:59:59.000Z

169

Automation in modeling: using automation for finishing room capacity planning  

Science Conference Proceedings (OSTI)

Capacity planning of a furniture finishing system using both deterministic analysis and stochastic simulation is conveniently performed with the aid ActiveX Automation. Users interactively build a complete model of a finishing system with an Excel interface, ...

Ryan Heath Melton; C. Thomas Culbreth; Stephen D. Roberts; Jeffrey A. Joines

2001-12-01T23:59:59.000Z

170

Validation Program - The Security Content Automation ...  

Science Conference Proceedings (OSTI)

... Information technology Laboratory (ITL). Security Content Automation Protocol (SCAP) Validation Program. The SCAP Validation ...

2013-12-10T23:59:59.000Z

171

Automating Personalized Battery Management on Smartphones  

E-Print Network (OSTI)

3 Automating Battery Management . . . . . . .122 Battery Goal Setting UI . . . . . . . . . . . . . . .Power and Battery Management . . . . . . . . . . . . . . .

Falaki, Mohamamd Hossein

2012-01-01T23:59:59.000Z

172

Get Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Get Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money Get Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money September 21, 2009 - 3:04pm Addthis Allison Casey...

173

Financing Capture Ready Coal-Fired Power Plants in China by Issuing Capture Options  

E-Print Network (OSTI)

Capture Ready is a design concept enabling fossil fuel plants to be retrofitted more economically with carbon dioxide capture and storage (CCS) technologies, however financing the cost of capture ready can be problematic, especially...

Liang, Xi; Reiner, David; Gibbons, Jon; Li, Jia

174

Automated hedcut illustration using isophotes  

Science Conference Proceedings (OSTI)

In this work, we present an automated system for creating hedcut illustrations, portraits rendered using small image feature aligned dots (stipples). We utilize edge detection and shading cues from the input photograph to direct stipple placement within ...

SungYe Kim; Insoo Woo; Ross Maciejewski; David S. Ebert

2010-06-01T23:59:59.000Z

175

Automated Assembly Using Feature Localization  

E-Print Network (OSTI)

Automated assembly of mechanical devices is studies by researching methods of operating assembly equipment in a variable manner; that is, systems which may be configured to perform many different assembly operations ...

Gordon, Steven Jeffrey

1986-12-01T23:59:59.000Z

176

Operational readiness review phase-1 final report for WRAP-1  

Science Conference Proceedings (OSTI)

This report documents the Operational Readiness Review for WRAP-1 Phase-1 operations. The report includes all criteria, lines of inquiry with resulting Findings and Observations. The review included assessing operational capability of the organization and the computer controlled process and facility systems.

Bowen, W., Westinghouse Hanford

1996-12-27T23:59:59.000Z

177

A Hybrid Solution Approach for Ready-Mixed Concrete Delivery  

Science Conference Proceedings (OSTI)

Companies in the concrete industry are facing the following scheduling problem on a daily basis: Concrete produced at several plants has to be delivered at customers' construction sites using a heterogeneous fleet of vehicles in a timely, but cost-effective ... Keywords: hybrid approach, integer multicommodity flow, ready-mixed concrete delivery, variable neighborhood search

Verena Schmid; Karl F. Doerner; Richard F. Hartl; Martin W. P. Savelsbergh; Wolfgang Stoecher

2009-02-01T23:59:59.000Z

178

Mission and Readiness Assessment for Fusion Nuclear Facilities  

E-Print Network (OSTI)

as planned for a commercial power plant. · Demonstrate reliable steady-state operation as an integrated to knowledge growth and risk reduction. · There is no absolute standard for FNF or DEMO "readiness" to proceed maintenance of the power core. 3. Closed tritium fuel cycle. 4. High level of public and worker safety, low

179

BG/Q Parallel Debugging Ready to Scale  

E-Print Network (OSTI)

BG/Q Parallel Debugging Ready to Scale ALCF MiraCon March 4, 2013 Ray Loy Applica8ons Performance Engineering ALCF #12;Outline § bgq_stack § coreprocessor § gdb seSngs for core files ­ hTps://www.alcf.anl.gov/resource-guides/vesta-debugging- core

Kemner, Ken

180

Summary of Recommendations from NERC Reliability Readiness Evaluations  

Science Conference Proceedings (OSTI)

The North American Electric Reliability Corporation (NERC) has recently conducted a large number of reliability readiness evaluations at the sites of various transmission operators, balancing authorities, and reliability coordinators. This report summarizes the most prevalent recommendations in these evaluations, enabling entities not yet audited to better prepare by initiating improvements in emphasized recommendation areas.

2008-10-20T23:59:59.000Z

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Recycling readiness of advanced batteries for electric vehicles  

SciTech Connect

Maximizing the reclamation/recycle of electric-vehicle (EV) batteries is considered to be essential for the successful commercialization of this technology. Since the early 1990s, the US Department of Energy has sponsored the ad hoc advanced battery readiness working group to review this and other possible barriers to the widespread use of EVs, such as battery shipping and in-vehicle safety. Regulation is currently the main force for growth in EV numbers and projections for the states that have zero-emission vehicle (ZEV) programs indicate about 200,000 of these vehicles would be offered to the public in 2003 to meet those requirements. The ad hoc Advanced Battery Readiness Working Group has identified a matrix of battery technologies that could see use in EVs and has been tracking the state of readiness of recycling processes for each of them. Lead-acid, nickel/metal hydride, and lithium-ion are the three EV battery technologies proposed by the major automotive manufacturers affected by ZEV requirements. Recycling approaches for the two advanced battery systems on this list are partly defined, but could be modified to recover more value from end-of-life batteries. The processes being used or planned to treat these batteries are reviewed, as well as those being considered for other longer-term technologies in the battery recycling readiness matrix. Development efforts needed to prepare for recycling the batteries from a much larger EV population than exists today are identified.

Jungst, R.G.

1997-09-01T23:59:59.000Z

182

Mission and Readiness Assessment for Fusion Nuclear Facilities  

SciTech Connect

Magnetic fusion development toward DEMO will most likely require a number of fusion nuclear facilities (FNF), intermediate between ITER and DEMO, to test and validate plasma and nuclear technologies and to advance the level of system integration. The FNF mission space is wide, ranging from basic materials research to net electricity demonstration, so there is correspondingly a choice among machine options, scope, and risk in planning such a step. Readiness requirements to proceed with a DEMO are examined, and two FNF options are assessed in terms of the contributions they would make to closing DEMO readiness gaps, and their readiness to themselves proceed with engineering design about ten years from now. An advanced tokamak (AT) pilot plant with superconducting coils and a mission to demonstrate net electricity generation would go a long way toward DEMO. As a next step, however, a pilot plant would entail greater risk than a copper-coil FNSF-AT with its more focussed mission and technology requirements. The stellarator path to DEMO is briefly discussed. Regardless of the choice of FNF option, an accompanying science and technology development program, also aimed at DEMO readiness, is absolutely essential.

G.H. Neilson, et. al.

2012-12-12T23:59:59.000Z

183

CCSI Technology Readiness Levels Likelihood Model (TRL-LM) Users Guide  

Science Conference Proceedings (OSTI)

This is the manual for the Carbon Capture Simulation Initiative (CCSI) Technology Readiness Level Likelihood model based on PNNL velo.

Engel, David W.; Dalton, Angela C.; Sivaramakrishnan, Chandrika; Lansing, Carina

2013-03-26T23:59:59.000Z

184

DOE G 413.3-4A, Technology Readiness Assessment Guide  

Directives, Delegations, and Requirements

The Guide assists individuals and teams involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for ...

2011-09-15T23:59:59.000Z

185

Automation World Features New White Paper on Wireless Security...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Automation World Features New White Paper on Wireless Security Automation World Features New White Paper on Wireless Security The April 2009 issue of Automation World magazine...

186

Open Automated Demand Response for Small Commerical Buildings  

E-Print Network (OSTI)

ofFullyAutomatedDemand ResponseinLargeFacilities. FullyAutomatedDemandResponseTestsinLargeFacilities. OpenAutomated DemandResponseCommunicationStandards:

Dudley, June Han

2009-01-01T23:59:59.000Z

187

Scenarios for Consuming Standardized Automated Demand Response Signals  

E-Print Network (OSTI)

of Fully Automated Demand Response in Large Facilities.Fully Automated Demand Response Tests in Large Facilities.Interoperable Automated Demand Response Infrastructure.

Koch, Ed

2009-01-01T23:59:59.000Z

188

Savannah River Site Salt Waste Processing Facility Technology Readiness Assessment Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Salt Waste Processing Facility Salt Waste Processing Facility Technology Readiness Assessment Report Kurt D. Gerdes Harry D. Harmon Herbert G. Sutter Major C. Thompson John R. Shultz Sahid C. Smith July 13, 2009 Prepared by the U.S. Department of Energy Washington, D.C. SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 ii This page intentionally left blank SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 iii SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 iii Signatures SRS Salt Waste Processing Facility Technology Readiness Assessment July 13, 2009 iv This page intentionally left blank SRS Salt Waste Processing Facility

189

Planning and Conduct of Operational Readiness Reviews (ORR)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-STD-3006-2000 DOE-STD-3006-2000 June 2000 Superseding DOE-STD-3006-95 November 1995 DOE STANDARD PLANNING AND CONDUCT OF OPERATIONAL READINESS REVIEWS (ORR) U.S. Department of Energy AREA OPER Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823 Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. DOE-STD-3006-2000 iii PLANNING AND CONDUCT OF OPERATIONAL READINESS REVIEWS (ORR)

190

Sandia National Laboratories' Readiness in Technical Base and Facilities Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sandia National Laboratories' Sandia National Laboratories' Readiness in Technical Base and Facilities Program OAS-L-13-13 September 2013 Department of Energy Washington, DC 20585 September 5, 2013 MEMORANDUM FOR THE MANAGER, SANDIA FIELD OFFICE FROM: David Sedillo, Director Western Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Sandia National Laboratories' Readiness in Technical Base and Facilities Program" BACKGROUND The Department of Energy's (Department) Sandia National Laboratories (Sandia) is a Government-owned, contractor operated Laboratory that is part of the National Nuclear Security Administration's (NNSA) nuclear weapons complex. One of Sandia's key missions is to ensure the safety, reliability and performance of the Nation's nuclear weapons stockpile. To accomplish

191

The Valles Caldera is ready for its close-up  

NLE Websites -- All DOE Office Websites (Extended Search)

January 2013 » January 2013 » The Valles Caldera Is Ready For Its Close-up Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit The Valles Caldera is ready for its close-up The first of three documentaries on the Valles Caldera could air on the local Public Broadcasting System as soon as January. January 1, 2013 dummy image Read our archives Contacts Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email The piece explores the potential impact of climate change and the 2011 Los Conchas fire on the sensitive ecosystem in the area. The first of three documentaries on the Valles Caldera could air on the local Public Broadcasting System (KNME) as soon as January. The piece, called Valles Caldera: The Science, explores the potential impact of

192

DOE Challenge Home Consolidated Renewable Energy Ready Checklist  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Consolidated Consolidated Renewable Energy Ready Checklist DOE Challenge Home National Program Requirements Mandatory Requirement 7 (Renewable Ready) shall be met by any home certified under the DOE Challenge Home program, only where all three conditions of the following conditions are met: 1. Location, based on zip code has at least 5 kWh/m 2 /day average daily solar radiation based on annual solar insolation using PVWatts online tool: http://gisatnrel.nrel.gov/PVWatts_Viewer/index.html AND; 2. Location does not have significant natural shading (e.g., trees, tall buildings on the south- facing roof, AND; 3. Home as designed has adequate free roof area within +/-45° of true south as noted in the table below. Note that in some cases a house may have insufficient roof area for the Solar

193

Marine and Hydrokinetic Technology Readiness Level | Open Energy  

Open Energy Info (EERE)

Marine and Hydrokinetic Technology Readiness Level Marine and Hydrokinetic Technology Readiness Level Jump to: navigation, search << Return to the MHK database homepage This field indicates the stage of development/deployment that technologies, which are undergoing partial or full-scale device testing, are currently in. Contents 1 TRL 1-3: Discovery / Concept Definition / Early Stage Development, Design, and Engineering 2 TRL 4: Proof of Concept 3 TRL 5/6: System Integration and Technology Laboratory Demonstration 4 TRL 7/8: Open Water System Testing, Demonstration, and Operation 5 TRL 9: Commercial-Scale Production / Application TRL 1-3: Discovery / Concept Definition / Early Stage Development, Design, and Engineering The purpose of this stage is to evaluate, to the largest extent possible, the scientific or technical merit and feasibility of ideas that appear to

194

Disciplined agility for process control & automation  

E-Print Network (OSTI)

Process automation vendors must consider agility as a basis to gain a competitive edge in innovation. Process Automation systems can impact the operating cost of manufacturing equipment, the safe control of large quantities ...

Tibazarwa, Augustine

2009-01-01T23:59:59.000Z

195

Automated Demand Response Opportunities in Wastewater Treatment Facilities  

E-Print Network (OSTI)

Interoperable Automated Demand Response Infrastructure,study of automated demand response in wastewater treatmentopportunities for demand response control strategies in

Thompson, Lisa

2008-01-01T23:59:59.000Z

196

AutoMed: an automated mediator for multi-issue bilateral negotiations  

Science Conference Proceedings (OSTI)

In this paper, we present AutoMed, an automated mediator for multi-issue bilateral negotiation under time constraints. AutoMed elicits the negotiators preferences and analyzes them. It monitors the negotiations and proposes possible solutions for resolving ... Keywords: Automated mediator, Experiments, Negotiation

Michal Chalamish; Sarit Kraus

2012-05-01T23:59:59.000Z

197

NISTIR 7511 Revision 1, Security Content Automation ...  

Science Conference Proceedings (OSTI)

... CONTENT AUTOMATION PROTOCOL (SCAP) VERSION 1.0 VALIDATION PROGRAM TEST REQUIREMENTS (DRAFT) XCCDF.V.2: The vendor ...

2013-04-29T23:59:59.000Z

198

Adaptable methodology for automation application development  

Science Conference Proceedings (OSTI)

An adaptable methodology for automation application development (AMAAD) is introduced. This development methodology is based on the key concept that design automation (DA) applications are a subset of higher level knowledge-based engineering (KBE) applications, ... Keywords: CommonKADS, Design automation, Knowledge-based engineering, MOKA, Productivity enhancement

Christian van der Velden; Cees Bil; Xinghuo Xu

2012-04-01T23:59:59.000Z

199

Green Button Sample Data from NSTAR (Monthly) | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Post on the discussion page or send us an email at apps@hq.doe.gov. NSTARAnonymized.zip More Documents & Publications Green Button Sample from Texas Green Button Sample Data...

200

Collaborative Systems for Building Automation  

Science Conference Proceedings (OSTI)

This paper describes the use of new generation of PLC's and WinCC software in creating collaborative systems for managing, controlling and supervising building electric equipment. These systems assure all the requirements of a building and offer to the ... Keywords: Building Automation System, PLC, WinCC, Redundancy, HVAC, HAS, SCADA, HMI

Ioan Valentin Sita

2012-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Automation ensures safety, extends production  

Science Conference Proceedings (OSTI)

This paper reviews some current improvements in offshore platform safety as a result of new regulations. In response to Norwegian Petroleum Directorate regulations limiting personnel on the rig floor, Weatherford Norway has developed a casing modem with remote-controlled power tongs. This paper reviews the various automated systems for handling drill pipes and joints on offshore platforms and how they work.

Perdue, J.M.

1996-06-01T23:59:59.000Z

202

Automated computation of scattering amplitudes  

E-Print Network (OSTI)

We review some of the recent advances in the computation of one-loop scattering amplitudes which led to the construction of efficient and automated computational tools for NLO predictions. Particular attention is devoted to unitarity-based methods and integrand-level reduction techniques. Extensions of one-loop integrand-level techniques to higher orders are also briefly illustrated.

Giovanni Ossola

2013-10-11T23:59:59.000Z

203

Rockwell Automation - Owens Corning Teaming Profile  

NLE Websites -- All DOE Office Websites (Extended Search)

Rockwell Automation Owens Corning Rockwell Automation Owens Corning 1201 S. Second Street 247 York Road Milwaukee, WI 53204 Guelph, Ontario N1E 3G4 Business: Industrial Automation Business: Textile / Fiber Nigel Hitchings Frank Peel Marketing Manager Electrical Support Specialist Phone: 508-357-8404 Phone: 519-823-7208 Email: nehitchings@ra.rockwell.com Email: frank.peel@owenscorning.com Owens Corning partners with Rockwell Automation to retrofit fans with VFDs, saving $67,000 annually Project Scope Owens Corning and Rockwell Automation installed Variable Frequency Drives (VFDs) on one 125HP cooling fan and three 40HP recirculation fans at the Owens Corning Guelph Glass Plant. The VFDs were integrated with the existing Rockwell Automation programmable automation controller to collect

204

Mexico-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Mexico-The World Bank Partnership for Market Readiness (PMR) Mexico-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Mexico-The World Bank Partnership for Market Readiness (PMR) Name Mexico-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

205

Colombia-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

Colombia-The World Bank Partnership for Market Readiness (PMR) Colombia-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Colombia-The World Bank Partnership for Market Readiness (PMR) Name Colombia-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

206

Brazil-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Brazil-The World Bank Partnership for Market Readiness (PMR) Brazil-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Brazil-The World Bank Partnership for Market Readiness (PMR) Name Brazil-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

207

Thailand-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

Thailand-The World Bank Partnership for Market Readiness (PMR) Thailand-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Thailand-The World Bank Partnership for Market Readiness (PMR) Name Thailand-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

208

China-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

China-The World Bank Partnership for Market Readiness (PMR) China-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: China-The World Bank Partnership for Market Readiness (PMR) Name China-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

209

India-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

India-The World Bank Partnership for Market Readiness (PMR) India-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: India-The World Bank Partnership for Market Readiness (PMR) Name India-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

210

Ukraine-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Ukraine-The World Bank Partnership for Market Readiness (PMR) Ukraine-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Ukraine-The World Bank Partnership for Market Readiness (PMR) Name Ukraine-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

211

Chile-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Chile-The World Bank Partnership for Market Readiness (PMR) Chile-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Chile-The World Bank Partnership for Market Readiness (PMR) Name Chile-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

212

Vietnam-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Vietnam-The World Bank Partnership for Market Readiness (PMR) Vietnam-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Vietnam-The World Bank Partnership for Market Readiness (PMR) Name Vietnam-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

213

Morocco-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Morocco-The World Bank Partnership for Market Readiness (PMR) Morocco-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Morocco-The World Bank Partnership for Market Readiness (PMR) Name Morocco-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

214

Jordan-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Jordan-The World Bank Partnership for Market Readiness (PMR) Jordan-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Jordan-The World Bank Partnership for Market Readiness (PMR) Name Jordan-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

215

Indonesia-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

Indonesia-The World Bank Partnership for Market Readiness (PMR) Indonesia-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Indonesia-The World Bank Partnership for Market Readiness (PMR) Name Indonesia-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

216

Turkey-The World Bank Partnership for Market Readiness (PMR) | Open Energy  

Open Energy Info (EERE)

Turkey-The World Bank Partnership for Market Readiness (PMR) Turkey-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Turkey-The World Bank Partnership for Market Readiness (PMR) Name Turkey-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

217

Measuring Market Power in the Ready-to-Eat Cereal Industry  

E-Print Network (OSTI)

the American Automobile Industry, Journal of Econometrics,Empirical Methods for Industries with Market Power, in R.Ready-to-eat Breakfast Cereal Industry in 1994 (A), Harvard

Nevo, Aviv

1999-01-01T23:59:59.000Z

218

TransForum v6n1 - Market-Ready Hydrogen Sensor Promises "Ultra...  

NLE Websites -- All DOE Office Websites (Extended Search)

sensors discovered at Argonne are true examples of a ready-for-market product of nanotechnology. "Our discovery is an enabling technology that will provide a fundamental safety...

219

Automated Export Control.PDF  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 I N S P E C T I O N R E P O R T U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF INSPECTIONS INSPECTION OF THE DEPARTMENT OF ENERGY'S AUTOMATED EXPORT CONTROL SYSTEM DECEMBER 2001 U.S. DEPARTMENT OF ENERGY Washington, DC 20585 December 7, 2001 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman /s/ Inspector General SUBJECT: INFORMATION: Report on "Inspection of the Department of Energy's Automated Export Control System" BACKGROUND The National Defense Authorization Act for Fiscal Year 2000 (NDAA for FY 2000) contained a provision that not later than March 30 of each year the President will submit to Congress, beginning in the year 2000 and ending in the year 2007, an annual report on the Government's policies and procedures with respect to the export of technologies and technical information with

220

Automated Transportation Management System (ATMS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Re evised June 2010 Re evised June 2010 Autom The Depa Transport an integra system al outbound air. Its ea 1989 DOE significant operationa commerce electronic rates, pre transporta users eva shipments opportunit logistics im ATMS is i radioactiv shipments System ATMS is a activities p packaging including materials. common s lading, fre * W * C S * A * H * E * * O 0 mated T artment of Ene tation Manage ated web-base lowing users freight shipm arly developm E Inspector G t opportunitie al efficiency t e. Today's sy cally prepare s pare shipping ation bills befo aluate carrier s, and use co ties for system mprovements ts capability t ve and other h s in a comple Modules a modular sys performed by g and transpo radioactive a . Its modules shipment info eight bills, rate System Web Applic Carrier Eval Selection Automated

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Automated nutrient analyses in seawater  

Science Conference Proceedings (OSTI)

This manual was assembled for use as a guide for analyzing the nutrient content of seawater samples collected in the marine coastal zone of the Northeast United States and the Bering Sea. Some modifications (changes in dilution or sample pump tube sizes) may be necessary to achieve optimum measurements in very pronounced oligotrophic, eutrophic or brackish areas. Information is presented under the following section headings: theory and mechanics of automated analysis; continuous flow system description; operation of autoanalyzer system; cookbook of current nutrient methods; automated analyzer and data analysis software; computer interfacing and hardware modifications; and trouble shooting. The three appendixes are entitled: references and additional reading; manifold components and chemicals; and software listings. (JGB)

Whitledge, T.E.; Malloy, S.C.; Patton, C.J.; Wirick, C.D.

1981-02-01T23:59:59.000Z

222

Instrumentation, Controls, and Automation Newsletter  

Science Conference Proceedings (OSTI)

This is the first newsletter for the Instrumentation, Controls, and Automation program of EPRI. This newsletter summarizes results of past and current projects and provides an overview of projects that will be completed in 2010. The first article describes the recently prototyped software Asset Fault Signature Database. The second article, "Inter-Control Center Communications Protocol Benefits Assessment," describes a previously completed EPRI/Southern Company tailored collaboration project. "Survey of C...

2009-12-22T23:59:59.000Z

223

Final Report on HOLODEC 2 Technology Readiness Level  

Science Conference Proceedings (OSTI)

During the period of this project, the Holographic Detector for Clouds 2 (HOLODEC 2) instrument has advanced from a laboratory-proven instrument with some initial field testing to a fully flight-tested instrument capable of providing useful cloud microphysics measurements. This can be summarized as 'Technology Readiness Level 8: Technology is proven to work - Actual technology completed and qualified through test and demonstration.' As part of this project, improvements and upgrades have been made to the optical system, the instrument power control system, the data acquisition computer, the instrument control software, the data reconstruction and analysis software, and some of the basic algorithms for estimating basic microphysical variables like droplet diameter. Near the end of the project, the instrument flew on several research flights as part of the IDEAS 2011 project, and a small sample of data from the project is included as an example. There is one caveat in the technology readiness level stated above: the upgrades to the instrument power system were made after the flight testing, so they are not fully field proven. We anticipate that there will be an opportunity to fly the instrument as part of the IDEAS project in fall 2012.

Shaw, RA; Spuler, SM; Beals, M; Black, N; Fugal, JP; Lu, L

2012-06-18T23:59:59.000Z

224

Definition: Distribution Automation Communications Network | Open Energy  

Open Energy Info (EERE)

Automation Communications Network Automation Communications Network Jump to: navigation, search Dictionary.png Distribution Automation Communications Network A communications network or networks designed to deliver control signals and information between distribution automation devices, and between these devices and utility grid control systems. These networks can utilize wired or wireless connections, and can be utility-owned or provided as services by a third party.[1] Related Terms distribution automation References ↑ https://www.smartgrid.gov/category/technology/distribution_automation_communications_network [[C LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ategory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from

225

Guidelines for Planning Interoperable Distribution Automation Systems  

Science Conference Proceedings (OSTI)

Fully integrated distribution automation is a relatively new challenge for the utility industry, and the full range of new capabilities it enables are not well understood. In addition, developing an overall strategy to long-term automation integration and deployment through the use of open standards adds to the challenge. These guidelines were developed to describe the overall vision of distribution automation and to assist in application of emerging open standards to the procurement and integration of a...

2004-04-26T23:59:59.000Z

226

Automated testing using executable formal specifications  

Science Conference Proceedings (OSTI)

A new method is presented for the automated random generation of valid content-sensitive test data and corresponding oracle information. The process takes as input a specification of the program under test, expressed as a functional program, and produces ... Keywords: automated program testing, automated random test data generation, automatic testing, computer aided software engineering, executable formal specifications, formal specification, functional program, oracle information, output test cases, program testing, valid content-sensitive test data, valid input space

N. Sanders

1996-01-01T23:59:59.000Z

227

Financing Capture Ready Coal-Fired Power Plants in China by Issuing Capture Options  

E-Print Network (OSTI)

Financing Capture Ready Coal-Fired Power Plants in China by Issuing Capture Options Xi Liang, Jia Li, Jon Gibbons and David Reiner December 2007 EPRG 0728 & CWPE 0761 #12;FINANCING CAPTURE READY COAL supercritical pulverized coal power plant in China, using a cash flow model with Monte-Carlo simulations

Aickelin, Uwe

228

E-government readiness: from the design table to the grass roots  

Science Conference Proceedings (OSTI)

e-Government generally refers to the government's use of information technologies (such as LANs, WANs, the Internet, Intranet, and mobile computing) to exchange information and services with citizens, businesses, general public and other arms of government. ... Keywords: ICT, digital divide, e-governance, e-government, e-government readiness, e-readiness

Hakikur Rahman

2007-12-01T23:59:59.000Z

229

Using time-driven activity-based costing to manage digital forensic readiness in large organisations  

Science Conference Proceedings (OSTI)

A digital forensic readiness (DFR) programme consists of a number of activities that should be chosen and managed with respect to cost constraints and risk. Traditional cost systems, however, can not provide the cost of individual activities. This makes ... Keywords: Cost management, Digital forensic readiness, Forensics management, Time-driven activity-based costing

K. Reddy; H. S. Venter; M. S. Olivier

2012-12-01T23:59:59.000Z

230

Automated Surface Observing System: Standby Power Options  

NLE Websites -- All DOE Office Websites (Extended Search)

Automated Automated Surface Observing System Standby Options Power Automated Surface Observing System (ASOS) General System Description * Self contained group of sensors and data gathering equipment that produces an automated weather observation * Weather observations support aviation, climate data, non government weather operations, public consumption, etc. * Initial deployment began in 1991 and continued through 1997 * Located at 884 sites nationwide, normally at airports * System has two distinct subsystems: Field installed equipment (DCP & Sensor Group) and an indoor processor (ACU) with peripherals * Separate facility power for DCP & Sensors and ACU 1 * measure and collect data * Located on the airport * back up group for 10 minutes * Currently pl

231

Substation automation gains momentum with modern options  

SciTech Connect

This paper discusses issues associated with utility substation automation. Monitoring equipment for monitoring power flow, quality, and harmonics for three substations simultaneously is described.

Beaty, W.

1996-12-01T23:59:59.000Z

232

Automated Continuous Commissioning of Commercial Buildings  

E-Print Network (OSTI)

Conference on Building Commissioning. San Francisco, CA. 17.Commercial Buildings Commissioning, LBNL- 56637, Nov. 2004.Automated Continuous Commissioning Tool GUI Screenshots from

Bailey, Trevor

2013-01-01T23:59:59.000Z

233

Building Technologies Office: Distributed Intelligent-Automated...  

NLE Websites -- All DOE Office Websites (Extended Search)

Distributed Intelligent-Automated Demand Response Building Management System Research Project to someone by E-mail Share Building Technologies Office: Distributed...

234

Automated Demand Response Technology Demonstration Project for...  

NLE Websites -- All DOE Office Websites (Extended Search)

Demonstration Project for Small and Medium Commercial Buildings Title Automated Demand Response Technology Demonstration Project for Small and Medium Commercial Buildings...

235

Automated fenestration selection based on lighting performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

i.e., aims at automated selection of fenestration systems that best meet specific lighting performance goals. The new method is based on manipulation of matrices that represent...

236

Next-Generation Robotics and Automation  

Science Conference Proceedings (OSTI)

... NIST activities led to the approval of a new IEEE Robotics and Automation Society Standards Working Group on ... Lead Organizational Unit: el. Staff: ...

2013-01-10T23:59:59.000Z

237

Home Network Technologies and Automating Demand Response  

E-Print Network (OSTI)

networks_in_the_home_the_new_growth_market.htm [12] NationalHome Network Technologies and Automating Demand Responsethe University of California. Home Network Technologies and

McParland, Charles

2010-01-01T23:59:59.000Z

238

Automated Transmission Kikuchi Diffraction for Nanomaterials ...  

Science Conference Proceedings (OSTI)

Presentation Title, Automated Transmission Kikuchi Diffraction for Nanomaterials Characterization in the SEM. Author(s), Scott Sitzman. On-Site Speaker...

239

Automated micro-tracking planar solar concentrators  

E-Print Network (OSTI)

Photonics) University of California, San Diego, 2011UNIVERSITY OF CALIFORNIA, SAN DIEGO Automated Micro-TrackingChair University of California, San Diego iii DEDICATION To

Hallas, Justin Matthew

2011-01-01T23:59:59.000Z

240

A Review of the World Bank Forest Carbon Partnership Facility Readiness  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » A Review of the World Bank Forest Carbon Partnership Facility Readiness Preparation Proposals Jump to: navigation, search Tool Summary Name: A Review of the World Bank Forest Carbon Partnership Facility Readiness Preparation Proposals Agency/Company /Organization: World Resources Institute Sector: Land Focus Area: Forestry Topics: Implementation, Policies/deployment programs Resource Type: Lessons learned/best practices Website: pdf.wri.org/working_papers/getting_ready_2010-07-13.pdf A Review of the World Bank Forest Carbon Partnership Facility Readiness Preparation Proposals Screenshot References: A Review of R-PP[1] This working paper is part of a series of regular updates reviewing the Readiness Preparation Proposals (R-PPs) submitted by REDD+ Country

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

REMOTE LABORATORIES IN AUTOMATION: AIP-PRIMECA RAO ARI PLATFORM Remote Laboratories in Automation  

E-Print Network (OSTI)

Terms -- Education, Laboratories, Manufacturing automation, Remote handling I.INTRODUCTION For a fewREMOTE LABORATORIES IN AUTOMATION: AIP-PRIMECA RAO ARI PLATFORM Remote Laboratories in Automation learners to train themselves on remote real or virtual systems. They represent essential components in e

Paris-Sud XI, Université de

242

Mobile RNA is Poised and Ready | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Glass Does a Double-Take Glass Does a Double-Take Welcoming a New Family of Superconductors A Lensless X-ray Camera for Nanoscale Materials and Biological Specimens The Collagen Protein Viewed at Unprecedented Detail Assembling Nanoparticles the Easy DNA-Way Science Highlights Archives: 2013 | 2012 | 2011 | 2010 2009 | 2008 | 2007 | 2006 2005 | 2004 | 2003 | 2002 2001 | 2000 | 1998 | Subscribe to APS Science Highlights rss feed Mobile RNA is Poised and Ready APRIL 10, 2008 Bookmark and Share Ribbon representation of the group II splicing intron. To see a 360° rotation of the recently solved O. iheyensis IIC intron crystal structure, click here (credit: Kevin Keating). A new picture of a genetic parasite isolated from a deep-sea bacterium is helping researchers see how certain specialized segments of RNA escape from

243

Carbon Characterization Laboratory Readiness to Receive Irradiated Graphite Samples  

SciTech Connect

The Carbon Characterization Laboratory (CCL) is located in Labs C19 and C20 of the Idaho National Laboratory Research Center. The CCL was established under the Next Generation Nuclear Plant Project to support graphite and ceramic composite research and development activities. The research conducted in this laboratory will support the Advanced Graphite Creep experimentsa major series of material irradiation experiments within the Next Generation Nuclear Plant Graphite program. The CCL is designed to characterize and test low activated irradiated materials such as high purity graphite, carbon-carbon composites, silicon-carbide composite, and ceramic materials. The laboratory is fully capable of characterizing material properties for both irradiated and nonirradiated materials. Major infrastructural modifications were undertaken to support this new radiological facility at Idaho National Laboratory. Facility modifications are complete, equipment has been installed, radiological controls and operating procedures have been established and work management documents have been created to place the CCL in readiness to receive irradiated graphite samples.

Karen A. Moore

2011-05-01T23:59:59.000Z

244

Automated fuel pin loading system  

DOE Patents (OSTI)

An automated loading system for nuclear reactor fuel elements utilizes a gravity feed conveyor which permits individual fuel pins to roll along a constrained path perpendicular to their respective lengths. The individual lengths of fuel cladding are directed onto movable transports, where they are aligned coaxially with the axes of associated handling equipment at appropriate production stations. Each fuel pin can be reciprocated axially and/or rotated about its axis as required during handling steps. The fuel pins are inserted as a batch prior to welding of end caps by one of two disclosed welding systems.

Christiansen, David W. (Kennewick, WA); Brown, William F. (West Richland, WA); Steffen, Jim M. (Richland, WA)

1985-01-01T23:59:59.000Z

245

Automate feeders to improve reliability  

SciTech Connect

Pacific Gas and Electric Co. (PG and E) improved system reliability and saved money with an alarm and control system for substation distribution switches using remote control by standard telephone-communication links. The method is especially well suited for urban and suburban areas with independent telephone and power systems. The automated systems can also add capability to areas now limited by the emergency capability. The primary distribution alarm and control system has both a substation and a field switch element. Photographs accompanying the description help to explain how the controls work. 7 figures. (DCK)

1981-01-01T23:59:59.000Z

246

Human-automation interaction for lunar landing aimpoint redesignation  

E-Print Network (OSTI)

Human-automation interactions are a critical area of research in systems with modem automation. The decision-making portion of tasks presents a special challenge for human-automation interactions because of the many factors ...

Needham, Jennifer M

2008-01-01T23:59:59.000Z

247

Concepts of User Centered Automation  

E-Print Network (OSTI)

The accident statistics of large technical systems have been steadily improved during the last decades. Also the number of fatal accidents in air and surface transportation is decreasing in spite off increased traffic. However, the relative share of so called human errors is increasing across application areas. Hence, for further improved reliability, the functional integration of humans in such systems must be reconsidered. Since the user, in the long run, will not and should not be eliminated by computers this paper reviews basic requirements of a human centered automation. Following an analysis of generic system functions, human factors requirements for automated functions are defined. It is shown how manual functions can be supported by assistance functions, for which a general system architecture and a classification scheme are presented. # 2001 ditions scientifiques et mdicales Elsevier SAS Zusammenfassung Die Unfallstatistiken grotechnischer Systeme haben sich in den letzten Jahrzehnten stndig verbessert, auch die Anzahl der Unflle mit Todesfolge im Luft- und Straenverkehr sinkt bei wachsendem Verkehrsaufkommen stetig. Der relative Anteil sogenannter menschlicher Fehler nimmt dagegen in allen Bereichen zu. Es besteht somit Anla, die Rolle des Menschen in derartigen Systemen neu zu berdenken, um die Zuverl ssigkeit komplexer Systeme weiter zu erhhen. Da der Benutzer auf lange Sicht nicht durch Rechner eliminiert werden kann und soll, untersucht dieser Beitrag die Erfordernisse einer benutzergerechten Automatisierung. Nach einer einleitenden Analyse grundlegender Systemfunktionen, der Automatisierungsgrenzen und der Leistungsdefizite des Menschen werden mgliche Formen und Strategien der Funktionsteilung zwischen Automatik und Benutzer hergeleitet. Zur Untersttzung...

Karl-friedrich Kraiss; Nico Hamacher

2001-01-01T23:59:59.000Z

248

Substation Integrated Automation System Based on DSP  

Science Conference Proceedings (OSTI)

This Paper introduces the application of digital signal processor (DSP) at Substation Integrated Automation System. Using the powerful digital signal processing capability of DSP, high-speed multi-channel data acquisition function, and excellent data ... Keywords: Substation, Digital Signal Processor, Integrated Automation System

Yanzhe Li; Duowang Fan; Xuwei Dong

2009-08-01T23:59:59.000Z

249

Microsoft Word - Wireless Automation World for OE FINAL.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Automation World Features New White Paper on Wireless Security, Interviews Authors April 16, 2009 The April 2009 issue of Automation World magazine features the white paper...

250

Findings from the 2004 Fully Automated Demand Response Tests...  

NLE Websites -- All DOE Office Websites (Extended Search)

the 2004 Fully Automated Demand Response Tests in Large Facilities Title Findings from the 2004 Fully Automated Demand Response Tests in Large Facilities Publication Type Report...

251

Demand Response and Open Automated Demand Response Opportunities...  

NLE Websites -- All DOE Office Websites (Extended Search)

Response and Open Automated Demand Response Opportunities for Data Centers Title Demand Response and Open Automated Demand Response Opportunities for Data Centers Publication Type...

252

A Demand Response (DR) Event: Benefits, Strategies, Automation...  

NLE Websites -- All DOE Office Websites (Extended Search)

A Demand Response (DR) Event: Benefits, Strategies, Automation and Future of DR Title A Demand Response (DR) Event: Benefits, Strategies, Automation and Future of DR Publication...

253

Design and Operation of an Open, Interoperable Automated Demand...  

NLE Websites -- All DOE Office Websites (Extended Search)

Design and Operation of an Open, Interoperable Automated Demand Response Infrastructure for Commercial Buildings Title Design and Operation of an Open, Interoperable Automated...

254

Demand Response and Open Automated Demand Response Opportunities...  

NLE Websites -- All DOE Office Websites (Extended Search)

Demand Response and Open Automated Demand Response Opportunities for Data Centers Title Demand Response and Open Automated Demand Response Opportunities for Data Centers...

255

Results and commissioning issues from an automated demand response pilot  

E-Print Network (OSTI)

of Fully Automated Demand Response in Large Facilities"Management and Demand Response in Commercial Buildings", L Band Commissioning Issues from an Automated Demand Response.

Piette, Mary Ann; Watson, Dave; Sezgen, Osman; Motegi, Naoya

2004-01-01T23:59:59.000Z

256

Findings from Seven Years of Field Performance Data for Automated...  

NLE Websites -- All DOE Office Websites (Extended Search)

Seven Years of Field Performance Data for Automated Demand Response in Commercial Buildings Title Findings from Seven Years of Field Performance Data for Automated Demand Response...

257

Open Automated Demand Response Dynamic Pricing Technologies and Demonstration  

E-Print Network (OSTI)

Goodin. 2009. Open Automated Demand Response Communicationsin Demand Response for Wholesale Ancillary Services. InOpen Automated Demand Response Demonstration Project. LBNL-

Ghatikar, Girish

2010-01-01T23:59:59.000Z

258

Field Demonstration of Automated Demand Response for Both Winter...  

NLE Websites -- All DOE Office Websites (Extended Search)

Demonstration of Automated Demand Response for Both Winter and Summer Events in Large Buildings in the Pacific Northwest Title Field Demonstration of Automated Demand Response for...

259

Field Testing of Automated Demand Response for Integration of...  

NLE Websites -- All DOE Office Websites (Extended Search)

Field Testing of Automated Demand Response for Integration of Renewable Resources in California's Ancillary Services Market for Regulation Products Title Field Testing of Automated...

260

Fast Automated Demand Response to Enable the Integration of Renewable...  

NLE Websites -- All DOE Office Websites (Extended Search)

Fast Automated Demand Response to Enable the Integration of Renewable Resources Title Fast Automated Demand Response to Enable the Integration of Renewable Resources Publication...

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Open Automated Demand Response Communications Specification (Version 1.0)  

E-Print Network (OSTI)

and Techniques for Demand Response. May 2007. LBNL-59975.tofacilitateautomating demandresponseactionsattheInteroperable Automated Demand Response Infrastructure,

Piette, Mary Ann

2009-01-01T23:59:59.000Z

262

Automated-Manual Transitions: Human Capabilities and Adaptive Cruise Control  

E-Print Network (OSTI)

TRANSIT AND HIGHWAYS Automated-Manual Transitions: HumanOF CALIFORNIA, BERKELEY Automated-Manual Transitions: HumanSuch systems will supplant manual controls during certain

Barton, Joseph E.; Cohn, Theodore E.; Nguyen, Khoi M.; Nguyen, Tieuvi; Toyofuku, Natsuko

2004-01-01T23:59:59.000Z

263

Mixed Manual/Semi-Automated Traffic: A Macroscopic Analysis  

E-Print Network (OSTI)

of Traffic Flow with Mixed Manual and Semi- Automatedof Mixed Semi-Automated/Manual Traffic, SAE Technical Paperof traffic flow with mixed manual and semi- automated

Bose, Arnab; Ioannou, Petros

2001-01-01T23:59:59.000Z

264

Computer Measurement and Automation System for Gas-fired Heating...  

NLE Websites -- All DOE Office Websites (Extended Search)

Computer Measurement and Automation System for Gas-fired Heating Furnace Title Computer Measurement and Automation System for Gas-fired Heating Furnace Publication Type Journal...

265

V-205: IBM Tivoli System Automation for Multiplatforms Java Multiple...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: IBM Tivoli System Automation for Multiplatforms Java Multiple Vulnerabilities V-205: IBM Tivoli System Automation for Multiplatforms Java Multiple Vulnerabilities July 29, 2013...

266

ISA Approves Standard for Wireless Automation in Process Control...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ISA Approves Standard for Wireless Automation in Process Control Applications ISA Approves Standard for Wireless Automation in Process Control Applications On September 9, the...

267

Solar Automation Inc | Open Energy Information  

Open Energy Info (EERE)

Inc Inc Jump to: navigation, search Name Solar Automation Inc Place Albuquerque, New Mexico Zip NM 8110 Product Produces manufacturing equipment for PV cells. References Solar Automation Inc[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Solar Automation Inc is a company located in Albuquerque, New Mexico . References ↑ "Solar Automation Inc" Retrieved from "http://en.openei.org/w/index.php?title=Solar_Automation_Inc&oldid=351247" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version Permanent link Browse properties About us Disclaimers Energy blogs Linked Data Developer services

268

Dynamic Whitelist Generation for Automated Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Methodology Methodology Results Dynamic Whitelist Generation for Automated Response Chris Strasburg, Josh Adams Ames Laboratory, US DOE cstras@ameslab.gov, jadams@ameslab.gov The Ames Laboratory, US DOE 1 Dynamic Whitelist Generation for Automated Response Introduction Methodology Results Outline 1 Introduction About Ames Laboratory Motivation 2 Methodology Data Classifiers Experiments 3 Results The Ames Laboratory, US DOE 2 Dynamic Whitelist Generation for Automated Response Introduction Methodology Results About Ames Laboratory Motivation Ames Physical Environment The Ames Laboratory, US DOE 3 Dynamic Whitelist Generation for Automated Response Introduction Methodology Results About Ames Laboratory Motivation Ames Network Environment The Ames Laboratory, US DOE 4 Dynamic Whitelist Generation for Automated Response Introduction Methodology Results About Ames

269

Take an integrated approach to refinery automation  

Science Conference Proceedings (OSTI)

An integrated approach to designing refinery automation systems is essential to guaranteeing systems compatibility and maximizing benefits. Several aspects of implementing integrated refinery automation should be considered early in the project. Many refineries have major parts of their business automated, starting from corporate planning at the higher level, down to DCS and field instrumentation. A typical refinery automation system architecture of the mid-eighties is shown. Automation systems help refineries improve their business through: Rationalization of man power; Increased throughputs; Reduced give-away; Reduced energy consumption; Better response to market demands and changes; Effective use of offsite areas through scheduling and automatic line-up systems; Reduced losses; and Decision support systems.

Wadi, I. (Abu Dhabi National Oil Co. (United Arab Emirates))

1993-09-01T23:59:59.000Z

270

AUTOMATING GROUNDWATER SAMPLING AT HANFORD  

Science Conference Proceedings (OSTI)

Until this past October, Fluor Hanford managed Hanford's integrated groundwater program for the U.S. Department of Energy (DOE). With the new contract awards at the Site, however, the CH2M HILL Plateau Remediation Company (CHPRC) has assumed responsibility for the groundwater-monitoring programs at the 586-square-mile reservation in southeastern Washington State. These programs are regulated by the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). The purpose of monitoring is to track existing groundwater contamination from past practices, as well as other potential contamination that might originate from RCRA treatment, storage, and disposal (TSD) facilities. An integral part of the groundwater-monitoring program involves taking samples of the groundwater and measuring the water levels in wells scattered across the site. More than 1,200 wells are sampled each year. Historically, field personnel or 'samplers' have been issued pre-printed forms that have information about the well(s) for a particular sampling evolution. This information is taken from the Hanford Well Information System (HWIS) and the Hanford Environmental Information System (HEIS)--official electronic databases. The samplers used these hardcopy forms to document the groundwater samples and well water-levels. After recording the entries in the field, the samplers turned the forms in at the end of the day and the collected information was posted onto a spreadsheet that was then printed and included in a log book. The log book was then used to make manual entries of the new information into the software application(s) for the HEIS and HWIS databases. This is a pilot project for automating this tedious process by providing an electronic tool for automating water-level measurements and groundwater field-sampling activities. The automation will eliminate the manual forms and associated data entry, improve the accuracy of the information recorded, and enhance the efficiency and sampling capacity of field personnel. The goal of the effort is to eliminate 100 percent of the manual input to the database(s) and replace the management of paperwork by the field and clerical personnel with an almost entirely electronic process. These activities will include the following: scheduling the activities of the field teams, electronically recording water-level measurements, electronically logging and filing Groundwater Sampling Reports (GSR), and transferring field forms into the site-wide Integrated Document Management System (IDMS).

CONNELL CW; HILDEBRAND RD; CONLEY SF; CUNNINGHAM DE

2009-01-16T23:59:59.000Z

271

Small Column Ion Exchange at Savannah River Site Technology Readiness Assessment Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Small Column Ion Exchange Technology at Small Column Ion Exchange Technology at Savannah River Site U.S. Department of Energy Office of Environmental Management Office of Technology Innovation and Development Technology Readiness Assessment Report November 2011 U.S. DOE-EM Office of Technology Innovation and Development November 11, 2011 Small Column Ion Exchange Program Technology Readiness Assessment Page 2 of 112 This page intentionally left blank November 11, 2011 U.S. DOE-EM Office of Technology Innovation and Development Small Column Ion Exchange Program Technology Readiness Assessment Page 3 of 112 APPROVALS ________________________ _ Harry D. Harmon Date

272

Operational readiness review for the Waste Experimental Reduction Facility. Final report  

SciTech Connect

An Operational Readiness Review (ORR) at the Idaho National Engineering Laboratory`s (INEL`s) Waste Experimental Reduction Facility (WERF) was conducted by EG&G Idaho, Inc., to verify the readiness of WERF to resume operations following a shutdown and modification period of more than two years. It is the conclusion of the ORR Team that, pending satisfactory resolution of all pre-startup findings, WERF has achieved readiness to resume unrestricted operations within the approved safety basis. ORR appraisal forms are included in this report.

Not Available

1993-11-01T23:59:59.000Z

273

Automated Fresnel lens tester system  

DOE Green Energy (OSTI)

An automated data collection system controlled by a desktop computer has been developed for testing Fresnel concentrators (lenses) intended for solar energy applications. The system maps the two-dimensional irradiance pattern (image) formed in a plane parallel to the lens, whereas the lens and detector assembly track the sun. A point detector silicon diode (0.5-mm-dia active area) measures the irradiance at each point of an operator-defined rectilinear grid of data positions. Comparison with a second detector measuring solar insolation levels results in solar concentration ratios over the image plane. Summation of image plane energies allows calculation of lens efficiencies for various solar cell sizes. Various graphical plots of concentration ratio data help to visualize energy distribution patterns.

Phipps, G.S.

1981-07-01T23:59:59.000Z

274

Automated cleaning of electronic components  

SciTech Connect

Environmental and operator safety concerns are leading to the elimination of trichloroethylene and chlorofluorocarbon solvents in cleaning processes that remove rosin flux, organic and inorganic contamination, and particulates from electronic components. Present processes depend heavily on these solvents for manual spray cleaning of small components and subassemblies. Use of alternative solvent systems can lead to longer processing times and reduced quality. Automated spray cleaning can improve the quality of the cleaning process, thus enabling the productive use of environmentally conscious materials, while minimizing personnel exposure to hazardous materials. We describe the development of a prototype robotic system for cleaning electronic components in a spray cleaning workcell. An important feature of the prototype system is the capability to generate the robot paths and motions automatically from the CAD models of the part to be cleaned, and to embed cleaning process knowledge into the automatically programmed operations.

Drotning, W.; Meirans, L.; Wapman, W.; Hwang, Y.; Koenig, L.; Petterson, B.

1994-07-01T23:59:59.000Z

275

Magnetic Resonance Connectome Automated Pipeline  

E-Print Network (OSTI)

This manuscript presents a novel, tightly integrated pipeline for estimating a connectome, which is a comprehensive description of the neural circuits in the brain. The pipeline utilizes magnetic resonance imaging (MRI) data to produce a high-level estimate of the structural connectivity in the human brain. The Magnetic Resonance Connectome Automated Pipeline (MRCAP) is efficient and its modular construction allows researchers to modify algorithms to meet their specific requirements. The pipeline has been validated and over 200 connectomes have been processed and analyzed to date. This tool enables the prediction and assessment of various cognitive covariates, and this research is applicable to a variety of domains and applications. MRCAP will enable MR connectomes to be rapidly generated to ultimately help spur discoveries about the structure and function of the human brain.

Gray, William R; Vogelstein, Joshua T; Landman, Bennett A; Prince, Jerry L; Vogelstein, R Jacob

2011-01-01T23:59:59.000Z

276

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 1590 of 8,172 results. 81 - 1590 of 8,172 results. Download CX-003319: Categorical Exclusion Determination Recovery Act - National Aeronautics and Space Administration Solar Electric Propulsion Technology Application Readiness (NSTAR) Automated Meter Reading (AMR) -Based Dynamic Pricing CX(s) Applied: A1, A9, A11, B2.2, B5.1 Date: 07/30/2010 Location(s): Newton, Massachusetts Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory http://energy.gov/nepa/downloads/cx-003319-categorical-exclusion-determination Download CX-000378: Categorical Exclusion Determination Monitoring, Verification, and Analysis Feasibility Study (for Demonstration of Carbon Capture and Sequestration from Steam Methane Reforming Process Gas Used for Large-Scale Hydrogen Production)

277

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 5840 of 29,416 results. 31 - 5840 of 29,416 results. Download CX-005290: Categorical Exclusion Determination Propane Corridor Development Program CX(s) Applied: B5.1 Date: 02/23/2011 Location(s): Carroll County, Georgia Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory http://energy.gov/nepa/downloads/cx-005290-categorical-exclusion-determination Download CX-003319: Categorical Exclusion Determination Recovery Act - National Aeronautics and Space Administration Solar Electric Propulsion Technology Application Readiness (NSTAR) Automated Meter Reading (AMR) -Based Dynamic Pricing CX(s) Applied: A1, A9, A11, B2.2, B5.1 Date: 07/30/2010 Location(s): Newton, Massachusetts Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory

278

Categorical Exclusion Determinations: A1 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 2010 30, 2010 CX-003318: Categorical Exclusion Determination Pacific Northwest Smart Grid Demonstration CX(s) Applied: A1, A9, A11, B1.7, B4.4, B5.1 Date: 07/30/2010 Location(s): Kennewick, Washington Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory July 30, 2010 CX-003501: Categorical Exclusion Determination Community-Wide Public Facilities Energy Efficiency Retrofit and Biomass Space Heating Conversion Project CX(s) Applied: A1, A9, A11, B5.1 Date: 07/30/2010 Location(s): Tanana, Alaska Office(s): Energy Efficiency and Renewable Energy, Golden Field Office July 30, 2010 CX-003319: Categorical Exclusion Determination Recovery Act - National Aeronautics and Space Administration Solar Electric Propulsion Technology Application Readiness (NSTAR) Automated Meter Reading

279

South Africa-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

South Africa-The World Bank Partnership for Market Readiness (PMR) South Africa-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: South Africa-The World Bank Partnership for Market Readiness (PMR) Name South Africa-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

280

Order Module--DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE O 425.1D, VERIFICATION OF READINESS TO START UP DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES Order Module--DOE O 425.1D, VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES "The familiar level of this module is divided into three sections. In the first section we will discuss the purpose of DOE O 425.1D and the requirements for 1) determining the level of readiness review (RR), 2) determining the startup authorization authority (SAA), and 3) the startup notification report. In the second section we will discuss 1) the requirements applicable to DOE ORRs and DOE RAs, and 2) the core requirements. In the third section we will discuss the 1) requirements for DOE field element and headquarters line management oversight of the startup or restart process, 2) requirements for the records management program, and

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Objective Guidance for Use in Setting Tropical Cyclone Conditions of Readiness  

Science Conference Proceedings (OSTI)

The Department of Defense uses a Tropical Cyclone Conditions of Readiness (TC-CORs) system to prepare bases and evacuate assets and personnel in advance of adverse weather associated with tropical cyclones (TCs). TC-CORs are recommended by weather ...

Charles R. Sampson; Andrea B. Schumacher; John A. Knaff; Mark DeMaria; Edward M. Fukada; Chris A. Sisko; David P. Roberts; Katherine A. Winters; Harold M. Wilson

2012-08-01T23:59:59.000Z

282

Costa Rica-The World Bank Partnership for Market Readiness (PMR) | Open  

Open Energy Info (EERE)

Costa Rica-The World Bank Partnership for Market Readiness (PMR) Costa Rica-The World Bank Partnership for Market Readiness (PMR) Jump to: navigation, search Logo: Costa Rica-The World Bank Partnership for Market Readiness (PMR) Name Costa Rica-The World Bank Partnership for Market Readiness (PMR) Agency/Company /Organization World Bank Partner Australia, Denmark, EC, Germany, Japan, Netherlands, Norway Spain, Switzerland, UK, and US Sector Climate, Energy Focus Area Non-renewable Energy, Buildings, Economic Development, Energy Efficiency, Goods and Materials, Greenhouse Gas, Grid Assessment and Integration, Industry, Offsets and Certificates, People and Policy, Transportation Topics Baseline projection, Finance, GHG inventory, Implementation, Low emission development planning, Market analysis, Policies/deployment programs

283

Application of RFID on equipment parts readiness management system of semiconductor packaging plant  

Science Conference Proceedings (OSTI)

Management of equipment parts readiness for process setup adjustment to meet variable order requirements in a semiconductor packaging plant is crucial to the health of production lines and downtime avoidance. In order to improve the current equipment ...

Wei-Ling Wang; Chiao-Tzu Huang; Shu-Jen Wang; Chia-Pao Chang; Hui-Wen Liao

2013-01-01T23:59:59.000Z

284

Fueling Robot Automates Hydrogen Hose Reliability Testing (Fact Sheet)  

SciTech Connect

Automated robot mimics fueling action to test hydrogen hoses for durability in real-world conditions.

Harrison, K.

2014-01-01T23:59:59.000Z

285

Automated container transport system between inland port and terminals  

Science Conference Proceedings (OSTI)

In this article we propose a new concept called automated container transportation system between inland port and terminals (ACTIPOT) which involves the use of automated trucks to transfer containers between an inland port and container terminals. The ... Keywords: Automated container transportation system, Petri nets, automated truck, supervisory control, vehicle control

Jianlong Zhang; Petros A. Ioannou; Anastasios Chassiakos

2006-04-01T23:59:59.000Z

286

Guidelines for Implementing Substation Automation Using UCA-SA (Utility Communications Architecture-Substation Automation)  

Science Conference Proceedings (OSTI)

This report provides guidelines for substation engineers, information technologists, and utility managers on the information issues related to substation automation, in particular when UCA-SA (Utility Communications Architecture Substation Automation IEC61850) standards are used. Substation automation is a new challenge for the utility industry, and these guidelines provide the overall vision as well as the specific steps that should be taken for successful implementation of this new enabling cap...

2003-11-11T23:59:59.000Z

287

Participation through Automation: Fully Automated Critical Peak Pricing in Commercial Buildings  

E-Print Network (OSTI)

2004. Working Group 2 Demand Response Evaluation Program2006. Au tomated Demand Response Control Strategies inrequired. Figure 2. Demand Response Automation Server and

Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Kiliccote, Sila; Linkugel, Eric

2006-01-01T23:59:59.000Z

288

Automation of Capacity Bidding with an Aggregator Using Open Automated Demand Response  

E-Print Network (OSTI)

ProjectCommittee135 CapacityBiddingProgram ClientandREPORT AUTOMATION OF CAPACITY BIDDING WITH AN AGGREGATORDevelopmentandTestingoftheCapacityBiddingProgramfor

Kiliccote, Sila

2011-01-01T23:59:59.000Z

289

Definition: Distribution Automation | Open Energy Information  

Open Energy Info (EERE)

Automation Automation Jump to: navigation, search Dictionary.png Distribution Automation DA is a family of technologies including sensors, processors, communication networks, and switches that can perform a number of distribution system functions depending on how they are implemented. Over the last 20 years, utilities have been applying DA to improve reliability, service quality and operational efficiency. More recently, DA is being applied to perform automatic switching, reactive power compensation coordination, or other feeder operations/control.[1] Related Terms sustainability, smart grid References ↑ https://www.smartgrid.gov/category/technology/distribution_automation [[Ca LikeLike UnlikeLike You and one other like this.One person likes this. Sign Up to see what your friends like.

290

Definition: Automated Distribution Circuit Switches | Open Energy  

Open Energy Info (EERE)

Circuit Switches Circuit Switches Jump to: navigation, search Dictionary.png Automated Distribution Circuit Switches Distribution circuit switches that can be operated automatically in response to control signals from local sensors, distribution automation systems, or grid control systems. Such switches can be installed as automated devices or existing equipment can be retrofitted with controls and communications. The degree of automation depends on the controls and communications system implemented. These switches can be opened or closed to isolate portions of a distribution circuit that has experienced a short circuit (fault), or must be taken out of service for maintenance or other operations. When used in combination, these switches can reroute power from other substations or nearby distribution circuits.[1]

291

LANL to certify automated influenza surveillance system  

NLE Websites -- All DOE Office Websites (Extended Search)

LANL to certify automated influenza surveillance system LANL to certify automated influenza surveillance system LANL to certify automated influenza surveillance system A compact automated system for surveillance and screening of potential pandemic strains of influenza and other deadly infectious diseases is a step closer to reality. January 31, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy

292

Mirle Automation Corporation | Open Energy Information  

Open Energy Info (EERE)

Mirle Automation Corporation Mirle Automation Corporation Jump to: navigation, search Name Mirle Automation Corporation Place Hsinchu, Taiwan Zip 30077 Sector Solar Product A Taiwan-based automation system integrators and related product manufacturers who have entered thin film solar cell manufacturing equipment business. Coordinates 24.69389°, 121.148064° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":24.69389,"lon":121.148064,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

293

Distributed Intelligent Automated Demand Response (DIADR) Building  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Distributed Intelligent Automated Demand Distributed Intelligent Automated Demand Response (DIADR) Building Management System Distributed Intelligent Automated Demand Response (DIADR) Building Management System The U.S. Department of Energy (DOE) is currently conducting research into distributed intelligent-automated demand response (DIADR) building management systems. Project Description This project aims to develop a DIADR building management system with intelligent optimization and control algorithms for demand management, taking into account a multitude of factors affecting cost including: Comfort Heating, ventilating, and air conditioning (HVAC) Lighting Other building systems Climate Usage and occupancy patterns. The key challenge is to provide the demand response the ability to address more and more complex building systems that include a variety of loads,

294

The Automated Tropical Cyclone Forecasting System (ATCF)  

Science Conference Proceedings (OSTI)

The U.S. Navy Automated Tropical Cyclone Forecasting System (ATCF) is an IBM-AT compatible software package developed for the Joint Typhoon Warning Center (JTWC), Guam. ATCF is designed to assist forecasters with the process of making tropical ...

Ronald J. Miller; Ann J. Schrader; Charles R. Sampson; Ted L. Tsui

1990-12-01T23:59:59.000Z

295

Nearly-automated metadata hierarchy creation  

Science Conference Proceedings (OSTI)

Currently, information architects create metadata category hierarchies manually. We present a nearly-automated approach for deriving such hierarchies, by converting the lexical hierarchy WordNet into a format that reflects the contents of a target ...

Emilia Stoica; Marti A. Hearst

2004-05-01T23:59:59.000Z

296

Robust Automated Quality Assurance of Radiosonde Temperatures  

Science Conference Proceedings (OSTI)

This paper presents a description of the fully automated quality-assurance (QA) procedures that are being applied to temperatures in the Integrated Global Radiosonde Archive (IGRA). Because these data are routinely used for monitoring variations ...

Imke Durre; Russell S. Vose; David B. Wuertz

2008-08-01T23:59:59.000Z

297

Automated Demand Response for Critical Peak Pricing  

NLE Websites -- All DOE Office Websites (Extended Search)

Automated Demand Response for Critical Peak Pricing Speaker(s): Naoya Motegi Date: June 9, 2005 - 12:00pm Location: Bldg. 90 California utilities have been exploring the use of...

298

Automated Speech Recognition in air traffic control  

E-Print Network (OSTI)

Over the past few years, the technology and performance of Automated Speech Recognition (ASR) systems has been improving steadily. This has resulted in their successful use in a number of industrial applications. Motivated ...

Trikas, Thanassis

1987-01-01T23:59:59.000Z

299

Design automation for microfluidics-based biochips  

Science Conference Proceedings (OSTI)

Advances in microfluidics technology offer exciting possibilities in the realm of enzymatic analysis, DNA analysis, proteomic analysis involving proteins and peptides, immunoassays, implantable drug delivery devices, and environmental toxicity monitoring. ... Keywords: Microfluidics, biochips, design automation

Krishnendu Chakrabarty; Jun Zeng

2005-10-01T23:59:59.000Z

300

An Evaluation of Inspection Automation Tools  

Science Conference Proceedings (OSTI)

A key element in manufacturing quality software is the early detection of defects which can be fostered by inspection techniques. Inspections may be boosted by automated tools that help in various tasks during the whole inspection process. We present ...

Vesa Tenhunen; Jorma Sajaniemi

2002-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Assessment of Wireless Technologies for Advanced Automation  

Science Conference Proceedings (OSTI)

The power industry is seeing a resurgence of interest in advanced automation and customer communications. A variety of wireless technologies are becoming available that could be used in advanced automation applications for utilities. However, decisions on physical media infrastructure should be made cautiously since use of these technologies may directly impact system performance, reliability, and long-term costs. This report is a preliminary analysis of some of the leading wireless technologies that are...

2007-12-20T23:59:59.000Z

302

Scientific Process Automation Improves Data Interaction  

SciTech Connect

This is an article written for the September 09 Scientific Computing magazine about the work of the Scientific Process Automation team of The U.S. Department of Energy (DOE) Scientific Discovery through Advanced Computing (SciDAC) program. The SPA team is focused on developing and deploying automated workflows for a variety of computational science domains. Scientific workflows are the formalization of a scientific process that is frequently and repetitively performed.

Critchlow, Terence J.

2009-09-30T23:59:59.000Z

303

Automated Parallel Capillary Electrophoretic System  

DOE Patents (OSTI)

An automated electrophoretic system is disclosed. The system employs a capillary cartridge having a plurality of capillary tubes. The cartridge has a first array of capillary ends projecting from one side of a plate. The first array of capillary ends are spaced apart in substantially the same manner as the wells of a microtitre tray of standard size. This allows one to simultaneously perform capillary electrophoresis on samples present in each of the wells of the tray. The system includes a stacked, dual carousel arrangement to eliminate cross-contamination resulting from reuse of the same buffer tray on consecutive executions from electrophoresis. The system also has a gel delivery module containing a gel syringe/a stepper motor or a high pressure chamber with a pump to quickly and uniformly deliver gel through the capillary tubes. The system further includes a multi-wavelength beam generator to generate a laser beam which produces a beam with a wide range of wavelengths. An off-line capillary reconditioner thoroughly cleans a capillary cartridge to enable simultaneous execution of electrophoresis with another capillary cartridge. The streamlined nature of the off-line capillary reconditioner offers the advantage of increased system throughput with a minimal increase in system cost.

Li, Qingbo (State College, PA); Kane, Thomas E. (State College, PA); Liu, Changsheng (State College, PA); Sonnenschein, Bernard (Brooklyn, NY); Sharer, Michael V. (Tyrone, PA); Kernan, John R. (Loganton, PA)

2000-02-22T23:59:59.000Z

304

Facility automation for retail facilities  

Science Conference Proceedings (OSTI)

This article will focus on retail chain stores with areas of 22,000 to 75,000 sq ft, but much of the article will apply to all retail stores independent of size. Typically, a store is serviced by 5 to 15 rooftop HVAC units with a total cooling capacity of 50 to 150 tons, depending on the floor area and geographic location. The interior lighting represents a load of 80 to 300 KW with three lighting levels--retail, stocking, and security or night. Most stores are located in strip centers, and therefore, the parking lot lighting is provided by the landlord, but each store does control and service its own sign lighting. Generally, the total load controlled by an FAS represents 130 to 450 KW with corresponding annual energy costs ranging from $65,000 to $200,000 (natural gas and electricity), depending on the size of the store and the local unit costs of energy. Historical utility data, electrical and mechanical drawings, site surveys, significant analyses of data, and most importantly, discussions with corporate facilities management personnel and store operations personnel provide the source for the development theory and sequence of operation of the design of the facility automation systems for retail stores. The three main goals of an FAS are: reduce utility operating costs, maintain comfort levels during occupied hours, reduce HVAC maintenance costs.

Ameduri, G. (Roth Bros., Inc., Youngstown, OH (United States). Facilities Automation Division)

1994-12-01T23:59:59.000Z

305

DOE Order Self Study Modules - DOE O 425.1D, Verification of Readiness to Startup or Restart Nuclear Facilities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5.1D 5.1D VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES DOE O 425.1D Familiar Level June 2011 1 DOE O 425.1D VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES FAMILIAR LEVEL _________________________________________________________________________ OBJECTIVES Given the familiar level of this module and the resources, you will be able to perform the following: 1. What is the purpose of DOE O 425.1D, Verification of Readiness to Startup or Restart Nuclear Facilities? 2. What are the requirements for determining the level of readiness review [operational readiness reviews (ORRs) and readiness assessments (RAs)]? 3. What are the requirements for determining the startup authorization authority? 4. What are the requirements for startup notification reports?

306

Open Automated Demand Response Technologies for Dynamic Pricing and Smart Grid  

E-Print Network (OSTI)

for Automated Demand Response in Commercial Buildings. In2010. Open Automated Demand Response Dynamic Pricing2009. Open Automated Demand Response Communications

Ghatikar, Girish

2010-01-01T23:59:59.000Z

307

Automated array assembly. Final report  

DOE Green Energy (OSTI)

Three main sections are included which describe a general technology assessment and manufacturing cost analysis; a near-term (1982) factory design; and the results of an experimental production study for the large-scale production of flat-panel silicon solar-cell arrays. The results of an extensive study and detailed analysis of technologies which could be related to array module manufacturing are presented. From this study, several manufacturing sequences emerge as candidates for satisfying the ERDA/JPL cost goal of $0.50/W selling price in 1986. A minimum manufacturing cost was found in a highly automated line of $0.30/W assuming the silicon is free. The panels are of a double-glass construction and are based on round wafers. Screen-printed silver has been used as the metallization with a spray-coated antireflection (AR) layer. The least expensive junction-formation technology appears to be ion implantation;however, several other technologies also may be used with very little cost penalty as described. An interim 1982 factory is described for the large-scale production of silicon solar-cell array modules. The boundary conditions for this design are the use of Czochralski silicon crystals and $25/kg polycrystalline silicon. The objective is a large-scale production facility to meet an intermediate ERDA cost goal of $2.00/W in 1982. A 6-month experimental production study of the elements of low-cost solar-cell manufacturing sequences is described as an outgrowth of the cost and manufacturing studies. This program consisted of three parts: an experimental production line study of the major variables associated with the fabrication of 3-in.-diameter silicon solar cells; a study of thick-film screen-printed silver metallization; and panel design and assembly development. (WHK)

D'Aiello, R.V.

1977-12-01T23:59:59.000Z

308

Automated array assembly. Annual report  

DOE Green Energy (OSTI)

The goal of the ERDA/JPL LSSA program of $0.50/W selling price for array modules in 1986 turns out to have been remarkably appropriate. An extensive and detailed analysis of technologies which could be related to array module manufacturing was completed and a minimum manufacturing cost in a highly automated line of $0.30/W was found assuming the silicon is free. The panels are of a double glass construction and are based on round wafers. Screen printed silver has been used as the metallization with a spray-coated AR layer. The least expensive junction formation technology appears to be ion implantation; however, several other technologies also may be used with very little cost penalty as described. Based on the required investment, a profit of $0.05/W appears reasonable. If silicon wafers are available at a price of $20 to 40/M/sup 2/, a selling price for these array modules of $0.50 to 0.66/W is projected. An analysis of the impact of factory size has been made. For a production level of 500 MW/yr, the price above is derived. For comparison, a factory processing 50 MW/yr using the same technology would sell modules for $0.54/W to $0.70/W. An analysis of the impact of wafer size indicates that with traditional metallization and panel designs there is no advantage in increasing wafer size from 3 in. to 5 in., and, in fact, there is some penalty (10% in $/W) due to increasedmetallization costs and reduced system performance. There is a premium placed on high efficiency due to its impact, not only on array module cost, but on system cost. For the near term goals of this program, wafers cut from single-crystal material seem the most likely sheet configuration.

Williams, B.F.

1977-05-01T23:59:59.000Z

309

Capture-ready power plants - options, technologies and economics  

SciTech Connect

A plant can be considered to be capture-ready if at some point in the future it can be retrofitted for carbon capture and sequestration and still be economical to operate. The first part of the thesis outlines the two major designs that are being considered for construction in the near-term - pulverized coal (PC) and integrated gasification/combined cycle (IGCC). It details the steps that are necessary to retrofit each of these plants for CO{sub 2} capture and sequestration and assesses the steps that can be taken to reduce the costs and output de-rating of the plant after a retrofit. The second part of the thesis evaluates the lifetime (40 year) net present value (NPV) costs of plants with differing levels of pre-investment for CO{sub 2} capture. Three scenarios are evaluated - a baseline supercritical PC plant, a baseline IGCC plant and an IGCC plant with pre-investment for capture. The results of this thesis show that a baseline PC plant is the most economical choice under low CO{sub 2} tax rates, and IGCC plants are preferable at higher tax rates. The third part of this thesis evaluates the concept of CO{sub 2} 'lock-in'. CO{sub 2} lock-in occurs when a newly built plant is so prohibitively expensive to retrofit for CO{sub 2} capture that it will never be retrofitted for capture, and offers no economic opportunity to reduce the CO{sub 2} emissions from the plant, besides shutting down or rebuilding. The results show that IGCC plants are expected to have lower lifetime CO{sub 2} emissions than a PC plant, given moderate (10-35 $/ton CO{sub 2}) initial tax rates. Higher 4 (above $40) or lower (below $7) initial tax rates do not result in significant differences in lifetime CO{sub 2} emissions from these plants. Little difference is seen in the lifetime CO{sub 2} emissions between the IGCC plants with and without pre-investment for CO{sub 2} capture. 32 refs., 22 figs., 20 tabs., 1 app.

Bohm, M.C. [Massachusetts Institute of Technology, Cambridge, MA (United States). Engineering Systems Division

2006-06-15T23:59:59.000Z

310

Operational readiness review plan for the radioisotope thermoelectric generator materials production tasks  

DOE Green Energy (OSTI)

In October 1989, a US shuttle lifted off from Cape Kennedy carrying the spacecraft Galileo on its mission to Jupiter. In November 1990, a second spacecraft, Ulysses, will be launched from Cape Kennedy with a mission to study the polar regions of the sun. The prime source of power for both spacecraft is a series of radioisotope thermoelectric generators (RTGs), which use plutonium oxide (plutonia) as a heat source. Several of the key components in this power system are required to ensure the safety of both the public and the environment and were manufactured at Oak Ridge National Laboratory (ORNL) in the 1980 to 1983 period. For these two missions, Martin Marietta Energy Systems, Inc. (Energy Systems), will provide an iridium-alloy component used to contain the plutonia heat source and a carbon-composite material that serves as a thermal insulator. ORNL alone will continue to fabricate the carbon-composite material. Because of the importance to DOE that Energy Systems deliver these high-quality components on time, performance of an Operational Readiness Review (ORR) of these manufacturing activities is necessary. Energy Systems Policy GP-24 entitled Operational Readiness Process'' describes the formal and comprehensive process by which appropriate Energy Systems activities are to be reviewed to ensure their readiness. This Energy System policy is aimed at reducing the risks associated with mission success and requires a management-approved readiness plan'' to be issued. This document is the readiness plan for the RTG materials production tasks. 6 refs., 11 figs., 1 tab.

Cooper, R.H.; Martin, M.M.; Riggs, C.R.; Beatty, R.L.; Ohriner, E.K.; Escher, R.N.

1990-04-19T23:59:59.000Z

311

DOE O 425.1D Admin Chg 1, Verification of Readiness to Start Up or Restart Nuclear Facilities  

Directives, Delegations, and Requirements

The order establishes requirements for verifying readiness for startup of new Hazard Category 1, 2, and 3 nuclear facilities, activities, and operations, and ...

2010-04-16T23:59:59.000Z

312

ISA Approves Standard for Wireless Automation in Process Control  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ISA Approves Standard for Wireless Automation in Process Control ISA Approves Standard for Wireless Automation in Process Control Applications ISA Approves Standard for Wireless Automation in Process Control Applications On September 9, the Standards and Practices Board of the International Society for Automation (ISA) approved the ISA-100.11a wireless standard, "Wireless Systems for Industrial Automation: Process Control and Related Applications," making it an official ISA standard. ISA Approves Standard for Wireless Automation in Process Control Applications More Documents & Publications DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan Wireless System Considerations When Implementing NERC Critical Infrastructure Protection Standards Control Systems Security Standards: Accomplishments And Impacts

313

Automated welding of nuclear piping systems  

SciTech Connect

Automated welding, or more broadly, automatic and mechanized welding processes, has found a role in nuclear power plant fabrication. This role has expanded from a rare or isolated application to relatively frequent usage in the last five years. More importantly, it is envisioned that use of automated welding will be increasing at an accelerated rate as broader exposure to this technology is achieved. Among the various pipe welding processes, the only one which has been developed for mechanized and automated nuclear piping welding is the gas tungsten arc welding (GTAW) process. This development has occurred in the past 10 to 15 years through the steady improvement and commmercialization of orbiting welding heads. Improvements in GTAW power supplies, control systems, etc., have aided this commercialization but the main element and pacing item has been the welding head itself. In order to review the status of mechanized and automated nuclear pipe welding, the topics of basic process equipment, joint design, fit-up requirements, welding parameters, and producibility will be addressed. In addition, anticipated future developments in automated systems will be discussed.

Hood, D.W.

1979-01-01T23:59:59.000Z

314

Automated Sorting of Transuranic Waste  

SciTech Connect

The HANDSS-55 Transuranic Waste Sorting Module is designed to sort out items found in 55-gallon drums of waste as determined by an operator. Innovative imaging techniques coupled with fast linear motor-based motion systems and a flexible end-effector system allow the operator to remove items from the waste stream by a touch of the finger. When all desired items are removed from the waste stream, the remaining objects are automatically moved to a repackaging port for removal from the glovebox/cell. The Transuranic Waste Sorting Module consists of 1) a high accuracy XYZ Stereo Measurement and Imaging system, 2) a vibrating/tilting sorting table, 3) an XY Deployment System, 4) a ZR Deployment System, 5) several user-selectable end-effectors, 6) a waste bag opening system, 7) control and instrumentation, 8) a noncompliant waste load-out area, and 9) a Human/Machine Interface (HMI). The system is modular in design to accommodate database management tools, additional load-out ports, and other enhancements. Manually sorting the contents of a 55-gallon drum takes about one day per drum. The HANDSS-55 Waste Sorting Module is designed to significantly increase the throughput of this sorting process by automating those functions that are strenuous and tiresome for an operator to perform. The Waste Sorting Module uses the inherent ability of an operator to identify the items that need to be segregated from the waste stream and then, under computer control, picks that item out of the waste and deposits it in the appropriate location. The operator identifies the object by locating the visual image on a large color display and touches the image on the display with his finger. The computer then determines the location of the object, and performing a highspeed image analysis determines its size and orientation, so that a robotic gripper can be deployed to pick it up. Following operator verification by voice or function key, the object is deposited into a specified location.

Shurtliff, Rodney Marvin

2001-03-01T23:59:59.000Z

315

Definition: Automated Capacitors | Open Energy Information  

Open Energy Info (EERE)

Capacitors Capacitors Jump to: navigation, search Dictionary.png Automated Capacitors Capacitors can increase the voltage on a distribution circuit by providing reactive power (often referred to as volt-amperes-reactive or VArs). Capacitor banks are switched in discrete steps, either manually, or in response to the voltage at the location where they are connected; typically, distribution capacitor banks are switched in a single step. If the voltage falls too far below the set point, the capacitor is switched in to raise the voltage. If the voltage rises too high above the set point, the capacitor is switched out to lower the voltage. Automated capacitors can be switched in coordination with other voltage control devices with signals from local sensors, distribution automation systems, or grid

316

AIS Automation Dresden | Open Energy Information  

Open Energy Info (EERE)

AIS Automation Dresden AIS Automation Dresden Jump to: navigation, search Name AIS Automation Dresden Place Dresden, Germany Zip D-01237 Product Provides software for industrial process control for the semiconductor and photovoltaic industries. Coordinates 51.053645°, 13.740815° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.053645,"lon":13.740815,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

317

Automated imaging system for single molecules  

SciTech Connect

There is provided a high throughput automated single molecule image collection and processing system that requires minimal initial user input. The unique features embodied in the present disclosure allow automated collection and initial processing of optical images of single molecules and their assemblies. Correct focus may be automatically maintained while images are collected. Uneven illumination in fluorescence microscopy is accounted for, and an overall robust imaging operation is provided yielding individual images prepared for further processing in external systems. Embodiments described herein are useful in studies of any macromolecules such as DNA, RNA, peptides and proteins. The automated image collection and processing system and method of same may be implemented and deployed over a computer network, and may be ergonomically optimized to facilitate user interaction.

Schwartz, David Charles; Runnheim, Rodney; Forrest, Daniel

2012-09-18T23:59:59.000Z

318

Verified hybrid controllers for automated vehicles  

E-Print Network (OSTI)

Abstract The objective of an Automated Highway System (AHS) is to increase the safety and throughput of the existing highway infrastructure by introducing traffic automation. AHS is an example of a large scale, multiagent complex dynamical system and is ideally suited for a hierarchical hybrid controller. We discuss the design of safe and efficient hybrid controllers for regulation of vehicles on an AHS. We use game theoretic techniques to deal with the multiagent and multiobjective nature of the problem. The result is a hybrid controller that by design guarantees safety, without the need for further verification. The calculations also provide an upper bound on the performance that can be expected in terms of throughput at various levels of centralization. Index Terms Automated highway systems, game theory, safety. I.

John Lygeros; Datta N. Godbole; Shankar Sastry

1998-01-01T23:59:59.000Z

319

Bar-code automated waste tracking system  

Science Conference Proceedings (OSTI)

The Bar-Code Automated Waste Tracking System was designed to be a site-Specific program with a general purpose application for transportability to other facilities. The system is user-friendly, totally automated, and incorporates the use of a drive-up window that is close to the areas dealing in container preparation, delivery, pickup, and disposal. The system features ``stop-and-go`` operation rather than a long, tedious, error-prone manual entry. The system is designed for automation but allows operators to concentrate on proper handling of waste while maintaining manual entry of data as a backup. A large wall plaque filled with bar-code labels is used to input specific details about any movement of waste.

Hull, T.E.

1994-10-01T23:59:59.000Z

320

DOE-STD-3006-95; DOE Standard Planning and Conduct of Operational Readiness Reviews (ORR)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3006-95 3006-95 November 1995 SUPERSEDING DOE-STD-3006-93 November 1993 DOE STANDARD PLANNING AND CONDUCT OF OPERATIONAL READINESS REVIEWS (ORR) U.S. Department of Energy AREA MISC Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (615) 576-8401. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 487-4650. DOE-STD-3006-95 i PLANNING AND CONDUCT OF OPERATIONAL READINESS REVIEWS (ORR) FOREWORD 1. DOE 0 425.1 establishes the requirement to conduct Operational Readiness Reviews

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Get Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money Get Ready for Fall: Leaf Peeping, Staying Warm, and Saving Money September 21, 2009 - 3:04pm Addthis Allison Casey Senior Communicator, NREL Tomorrow is the official first day of fall, and while I always mourn the end of summer, one of the best things about fall is leaf peeping! Last year, we took my father-in-law's red '57 T-bird convertible on a lovely drive through the mountains to see the bright yellow aspens. Something about a car like that draws lots of attention-honks, waves, questions. We basically made friends everywhere we went. As much fun as that was, it wasn't exactly the most fuel-efficient or environmentally friendly excursion. I know we can do better this year; beautiful leaves are less than an hour's

322

Getting Ready for Electric Drive: the Plug-In Vehicle and Infrastructure  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ready for Electric Drive: the Plug-In Vehicle and Ready for Electric Drive: the Plug-In Vehicle and Infrastructure Workshop Getting Ready for Electric Drive: the Plug-In Vehicle and Infrastructure Workshop August 18, 2010 - 5:30pm Addthis Matt Rogers Matt Rogers McKinsey & Company Blogs have been abuzz on electric vehicles and advanced batteries recently, and likely in no small part due to some of the programs that are kicking into high gear at the Department of Energy right now. On July 22, we hosted a Plug-In Vehicle & Infrastructure Workshop that brought together nearly 200 attendees and 600 web participants to discuss near-term actions to accelerate deployment of electric-drive vehicles. The program demonstrated how federal leadership can speed up preparation for vehicles expected in showrooms at the end of this year. This leadership complements the Obama

323

Nek5000 Ready to Use after Simulations of Important Pipe Flow Benchmark |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nek5000 Ready to Use after Simulations of Important Pipe Flow Nek5000 Ready to Use after Simulations of Important Pipe Flow Benchmark Nek5000 Ready to Use after Simulations of Important Pipe Flow Benchmark January 29, 2013 - 1:42pm Addthis Velocity magnitude in MATiS-H spacer grid with swirl-type vanes. Velocity magnitude in MATiS-H spacer grid with swirl-type vanes. As part of the on-going Nek5000 validation efforts, a series of large eddy simulations (LES) have been performed for thermal stratification in a pipe. Results were in good agreement with the experiment and the simulation data has provided insight into the physics of the flow. An additional series of simulations of the OECD-NEA MATiS-H benchmark has also been completed using intermediate- fidelity modeling approaches, such as k-epsilon, k-omega shear stress transport, and ID detached eddy simulation, as well as one

324

Ready, Set . . . Get Prepped for Monday's Launch of the 'America's Next  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ready, Set . . . Get Prepped for Monday's Launch of the Ready, Set . . . Get Prepped for Monday's Launch of the 'America's Next Top Energy Innovator' Challenge Ready, Set . . . Get Prepped for Monday's Launch of the 'America's Next Top Energy Innovator' Challenge April 29, 2011 - 10:35am Addthis Ginny Simmons Ginny Simmons Former Managing Editor for Energy.gov, Office of Public Affairs The 'America's Next Top Energy Innovator' Challenge will begin on May 2. That means that starting on Monday, and continuing through December 15, entrepreneurs and start-up companies will be able to apply for any of the Department of Energy's 15,000 unlicensed patents at a greatly reduced cost and with much less paperwork. Since Secretary Chu announced the challenge at the end of March our phones have been ringing and our email inboxes have been piling up with questions

325

The Ohio State University Readies for its Encore at the Solar Decathlon |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Ohio State University Readies for its Encore at the Solar The Ohio State University Readies for its Encore at the Solar Decathlon The Ohio State University Readies for its Encore at the Solar Decathlon April 15, 2011 - 5:03pm Addthis The Ohio State University displayed their design model at the International Builders' Show in Orlando, Florida from January 12-15, 2011. | Credit: All Commercial Photography/U.S. Department of Energy Solar Decathlon The Ohio State University displayed their design model at the International Builders' Show in Orlando, Florida from January 12-15, 2011. | Credit: All Commercial Photography/U.S. Department of Energy Solar Decathlon Erik Hyrkas Erik Hyrkas Media Relations Specialist, Office of Energy Efficiency & Renewable Energy How can I participate? The next Solar Decathlon will be held Sept. 23-Oct. 2, 2011, at

326

Beyond Commissioning: The Role of Automation  

Science Conference Proceedings (OSTI)

This article takes a brief look at the benefits of commissioning and describes a vision of the future where most of the objectives of commissioning will be accomplished automatically by capabilities built into the building systems themselves. Commissioning will become an activity that's performed continuously rather than periodically, and only repairs requiring replacement or overhaul of equipment will require manual intervention. The article then identifies some of the technologies that will be needed to realize this vision and ends with a call for all involved in the enterprise of building commissioning and automation to embrace and dedicate themselves to a future of automated commissioning.

Brambley, Michael R.; Katipamula, Srinivas

2005-02-01T23:59:59.000Z

327

ENERGY STAR Focus on Energy Efficiency in Ready Mix Concrete Manufacturing  

NLE Websites -- All DOE Office Websites (Extended Search)

Ready Mix Concrete Ready Mix Concrete Manufacturing Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In this section Get started with ENERGY STAR Make the business case Build an energy management program Measure, track, and benchmark Tools for benchmarking energy management practices Tools for tracking and benchmarking facility energy performance ENERGY STAR Energy Performance Indicators for plants

328

Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TECHNOLOGY READINESS ASSESSMENT TECHNOLOGY READINESS ASSESSMENT OF THE CALCINE DISPOSITION PROJECT VOLUME ONE Anthony F. Kluk Hoyt C. Johnson Clyde Phillip McGinnis Michael Rinker Steven L. Ross Herbert G. Sutter John Vienna February 2011 Prepared by the U.S. Department of Energy Washington, DC February 2011 ii This page intentionally left blank. Review of Calcine Disposition Project Self-Assessment of Technology Maturation iii SIGNATURES ____________________________________ ____________________________________ Anthony F. Kluk, Team Lead Date ____________________________________ ____________________________________ Hoyt C. Johnson Date ____________________________________ ____________________________________ Clyde Phillip McGinnis Date ____________________________________ ____________________________________

329

Home Automation in the Wild: Challenges and Opportunities  

E-Print Network (OSTI)

automation in two groups: 1) Do-it-yourselfers (DIY) who have installed automation themselves and 2 purposes [33]. To compare and contrast these two groups, we recruited both DIY and Outsourced households

Rajamani, Sriram K.

330

Automated Demand Response Strategies and Commissioning Commercial Building Controls  

E-Print Network (OSTI)

4 9 . Piette et at Automated Demand Response Strategies andDynamic Controls for Demand Response in New and ExistingFully Automated Demand Response Tests in Large Facilities"

Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila; Linkugel, Eric

2006-01-01T23:59:59.000Z

331

Automated Battery Swap and Recharge to Enable Persistent UAV Missions  

E-Print Network (OSTI)

This paper introduces a hardware platform for automated battery changing and charging for multiple UAV agents. The automated station holds a bu er of 8 batteries in a novel dual-drum structure that enables a "hot" battery ...

Toksoz, Tuna

332

Automated and human proofs in general mathematics: an initial comparison  

Science Conference Proceedings (OSTI)

First-order translations of large mathematical repositories allow discovery of new proofs by automated reasoning systems. Large amounts of available mathematical knowledge can be re-used by combined AI/ATP systems, possibly in unexpected ways. But automated ...

Jesse Alama; Daniel Khlwein; Josef Urban

2012-03-01T23:59:59.000Z

333

Northwest Open Automated Demand Response Technology Demonstration Project  

E-Print Network (OSTI)

Report 2009. Open Automated Demand Response Communicationsand Techniques for Demand Response. California Energyand S. Kiliccote. Estimating Demand Response Load Impacts:

Kiliccote, Sila

2010-01-01T23:59:59.000Z

334

AN UPDATE ON THE DEVELOPMENT OF AN AUTOMATED ...  

Science Conference Proceedings (OSTI)

... An unconventional automated lipidomics approach (1) was designed by applying a liquid chromatography autosampler to draw up discrete ...

335

SYSTEMS AND METHODS FOR THE AUTONOMOUS CONTROL, AUTOMATED ...  

systems and methods for the autonomous control, automated guidance, and global coordination of moving process machinery united states patent application

336

Performance of Integrated Systems of Automated Roller Shade Systems...  

NLE Websites -- All DOE Office Websites (Extended Search)

032011 Keywords automated roller shade systems, daylight responsive dimming systems, daylighting, Integrated systems, photoelectric controls Abstract Daylight responsive...

337

Use of Automated External Defibrillators  

SciTech Connect

In an effort to improve survival from cardiac arrest, the American Heart Association (AHA) has promoted the Chain of Survival concept, describing a sequence of prehospital steps that result in improved survival after sudden cardiac arrest. These interventions include immediate deployment of emergency medical services, prompt cardiopulmonary resuscitation, early defibrillation when indicated, and early initiation of advanced medical care. Early defibrillation has emerged as the most important intervention with survival decreasing by 10% with each minute of delay in defibrillation. Ventricular Fibrillation (VF) is a condition in which there is uncoordinated contraction of the heart cardiac muscle of the ventricles in the heart, making them tremble rather than contract properly. VF is a medical emergency and if the arrhythmia continues for more than a few seconds, blood circulation will cease, and death can occur in a matter of minutes. During VF, contractions of the heart are not synchronized, blood flow ceases, organs begin to fail from oxygen deprivation and within 10 minutes, death will occur. When VF occurs, the victim must be defibrillated in order to establish the hearts normal rhythm. On average, the wait for an ambulance in populated areas of the United States is about 11 minutes. In view of these facts, the EFCOG Electrical Safety Task Group initiated this review to evaluate the potential value of deployment and use of automated external defibrillators (AEDs) for treatment of SCA victims. This evaluation indicates the long term survival benefit to victims of SCA is high if treated with CPR plus defibrillation within the first 3-5 minutes after collapse. According to the American Heart Association (AHA), survival rates as high as 74% are possible if treatment and defibrillation is performed in the first 3 minutes. In contrast survival rates are only 5% where no AED programs have been established to provide prompt CPR and defibrillation. ["CPR statistics" American Heart Association] Early intervention with both CPR and defibrillation can result in high long-term survival rates for SCA, as demonstrated by a study investigating the beneficial effects of AED devices at Chicagos OHare and Midway airports. The American Medical Association (AMA) advocates the widespread placement of AEDs [AMA Res. 413, A-02; Res. 424, A-04]; supports increasing government and industry funding for the purchase of AED devices; and encourages the American public to become trained in CPR and the use of AEDs. Some states, including Maryland, have enacted legislation requiring AED devices and a certified responder be available at high school and school-sponsored athletic events due the risk of SCA to athletes (the most common cause of death in young athletes). Ensuring AED availability at Department of Energy (DOE) sites would serve as a means of preventative intervention for over 14,000 DOE employees and 193,000 contract workers. It is estimated 1 per 1,000 adults 35 years of age and older will experience SCA in a given year.

Gregory K Christensen

2009-02-01T23:59:59.000Z

338

Context and Structure in Automated Full-Text Information Access  

E-Print Network (OSTI)

Context and Structure in Automated Full-Text Information Access Marti A. Hearst Report No. UCB 94720 #12;#12;Context and Structure in Automated Full-Text Information Access by Marti A. Hearst B and Structure in Automated Full-Text Information Access Copyright c 1994 by Marti A. Hearst #12;In memory of my

Hearst, Marti

339

White Paper Series An Overview of Automated Enforcement  

E-Print Network (OSTI)

White Paper Series An Overview of Automated Enforcement Systems and Their Potential for Improving The following paper takes a widespread look at automated enforcement systems, specifically red-light cameras of drivers running red lights and speeding, the paper will define automated enforcement systems, the impact

North Carolina at Chapel Hill, University of

340

Automated Battery Swap and Recharge to Enable Persistent UAV Missions  

E-Print Network (OSTI)

Automated Battery Swap and Recharge to Enable Persistent UAV Missions Tuna Toksoz , Joshua Redding introduces a hardware platform for automated battery changing and charging for multiple UAV agents. The automated station holds a buffer of 8 batteries in a novel dual-drum structure that enables a "hot" battery

How, Jonathan P.

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Steam Generator Automated Eddy Current Data Analysis: A Benchmarking Study  

Science Conference Proceedings (OSTI)

This benchmarking study informs utility nondestructive evaluation (NDE) engineers of the status of automating analysis of data from steam generator tube eddy current testing. Study results will contribute to a detailed plan for continuing development of automated data analysis system processes. One day, automated data analysis will provide utilities with a consistent, accurate, and cost-effective method of analyzing eddy current inspection data.

1998-12-16T23:59:59.000Z

342

Docking automation related technology, Phase 2 report  

SciTech Connect

This report generalizes the progress for Phase II of the Docking Automated Related Technologies task component within the Modular Artillery Ammunition Delivery System (MAADS) technology demonstrator of the Future Armored Resupply Vehicle (FARV) project. This report also covers development activity at Oak Ridge National Laboratory (ORNL) during the period from January to July 1994.

Jatko, W.B.; Goddard, J.S.; Gleason, S.S.; Ferrell, R.K.

1995-04-01T23:59:59.000Z

343

Apparatus for automated testing of biological specimens  

DOE Patents (OSTI)

An apparatus for performing automated testing of infections biological specimens is disclosed. The apparatus comprise a process controller for translating user commands into test instrument suite commands, and a test instrument suite comprising a means to treat the specimen to manifest an observable result, and a detector for measuring the observable result to generate specimen test results.

Layne, Scott P. (Los Angeles, CA); Beugelsdijk, Tony J. (Los Alamos, NM)

1999-01-01T23:59:59.000Z

344

Focus Windows: A Tool for Automated Provers ?  

E-Print Network (OSTI)

Focus Windows: A Tool for Automated Provers ? Florina Piroi Research Institute For Symbolic or understand the validity of a particular step. Focus windows were #12;rst introduced as a technique for proof the implementation and the use of the focus windows technique in the frame of the Theorema system [3]. One

345

Safe controllers design for industrial automation systems  

Science Conference Proceedings (OSTI)

The design of safe industrial controllers is one of the most important domains related to Automation Systems research. To support it, synthesis and analysis techniques are available. Among the analysis techniques, two of the most important are Simulation ... Keywords: Formal verification, Industrial systems behaviour modelling, Real-time systems, Safe controllers, Simulation

Jos Machado; Eurico Seabra; Jos C. Campos; Filomena Soares; Celina P. Leo

2011-05-01T23:59:59.000Z

346

Automated modeling of modular robotic configurations  

Science Conference Proceedings (OSTI)

This research presents an automated method to build kinematic and dynamic models for assembling modular components of modular robotic systems. By comparison with other approaches, the proposed method is applicable to any robotic configuration with serial, ... Keywords: Automatic modeling, Computer-aided design, Configuration design, Finite element method, Modular architecture, Modular robotic system, Reconfigurable robot

Z. M. Bi; W. A. Gruver; W. J. Zhang; S. Y. T. Lang

2006-12-01T23:59:59.000Z

347

Automated reasoning service for HOL light  

Science Conference Proceedings (OSTI)

HOL(y)Hammer is an AI/ATP service for formal (computer-understandable) mathematics encoded in the HOL Light system, in particular for the users of the large Flyspeck library. The service uses several automated reasoning systems combined with several ...

Cezary Kaliszyk, Josef Urban

2013-07-01T23:59:59.000Z

348

Honeywell Modular Automation System Computer Software Documentation  

Science Conference Proceedings (OSTI)

This document provides a Computer Software Documentation for a new Honeywell Modular Automation System (MAS) being installed in the Plutonium Finishing Plant (PFP). This system will be used to control new thermal stabilization furnaces in HA-211 and vertical denitration calciner in HC-230C-2.

CUNNINGHAM, L.T.

1999-09-27T23:59:59.000Z

349

Toward automation in hearing aid design  

Science Conference Proceedings (OSTI)

In the manufacturing of customized medical prostheses, such as in-the-ear hearing aids, the design process often is dictated by a source template representing the anatomy of a patient and a set of work instructions representing the description of surface ... Keywords: Application, Automation, CAD, CAM, Expert systems, Feature recognition, Hearing aid design, Medical prostheses manufacturing, Modeling, Rule-based systems, Shape transformation

Konrad Sickel; Sajjad Baloch; Rupen Melkisetoglu; Vojtech Bubnik; Sergei Azernikov; Tong Fang

2011-12-01T23:59:59.000Z

350

Automation of Capacity Bidding with an Aggregator Using Open Automated Demand Response  

Science Conference Proceedings (OSTI)

This report summarizes San Diego Gas& Electric Company?s collaboration with the Demand Response Research Center to develop and test automation capability for the Capacity Bidding Program in 2007. The report describes the Open Automated Demand Response architecture, summarizes the history of technology development and pilot studies. It also outlines the Capacity Bidding Program and technology being used by an aggregator that participated in this demand response program. Due to delays, the program was not fully operational for summer 2007. However, a test event on October 3, 2007, showed that the project successfully achieved the objective to develop and demonstrate how an open, Web?based interoperable automated notification system for capacity bidding can be used by aggregators for demand response. The system was effective in initiating a fully automated demand response shed at the aggregated sites. This project also demonstrated how aggregators can integrate their demand response automation systems with San Diego Gas& Electric Company?s Demand Response Automation Server and capacity bidding program.

Kiliccote, Sila; Piette, Mary Ann

2008-10-01T23:59:59.000Z

351

Salsbury and Diamond: Automated Testing of HVAC Systems for Commissioning -1 -Automated Testing of HVAC Systems for Commissioning  

E-Print Network (OSTI)

and Diamond: Automated Testing of HVAC Systems for Commissioning - 1 - Automated Testing of HVAC Systems This paper describes an approach to the automation of the commissioning of HVAC systems. The approach of many HVAC systems is limited more by poor installation, commissioning, and maintenance than by poor

352

Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Federal Operational Readiness Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Operational Readiness Review June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2 4.0 Results ................................................................................................................................................... 2

353

Readiness plan, Hanford 300 Area Treated Effluent Disposal Facility: Revision 1  

Science Conference Proceedings (OSTI)

The 300 Area Treated Effluent Disposal Facility (TEDF) is designed for the collection, treatment, and eventual disposal of liquid waste from the 300 Area Process Sewer (PS) system. The PS currently discharges water to the 300 Area Process Trenches. Facilities supported total 54 buildings, including site laboratories, inactive buildings, and support facilities. Effluent discharges to the process sewer from within these facilities include heating, ventilation, and air conditioning systems, heat exchangers, floor drains, sinks, and process equipment. The wastewaters go through treatment processes that include iron coprecipitation, ion exchange and ultraviolet oxidation. The iron coprecipitation process is designed to remove general heavy metals. A series of gravity filters then complete the clarification process by removing suspended solids. Following the iron coprecipitation process is the ion exchange process, where a specific resin is utilized for the removal of mercury. The final main unit operation is the ultraviolet destruction process, which uses high power ultraviolet light and hydrogen peroxide to destroy organic molecules. The objective of this readiness plan is to provide the method by which line management will prepare for a Readiness Assessment (RA) of the TEDF. The self-assessment and RA will assess safety, health, environmental compliance and management readiness of the TEDF. This assessment will provide assurances to both WHC and DOE that the facility is ready to start-up and begin operation.

Storm, S.J.

1994-11-08T23:59:59.000Z

354

Operational Readiness Review Final Report For F-Canyon Restart. Phase 1  

SciTech Connect

An independent WSRC Operational Readiness Review was performed for the restart of Phase 1 processing in F-Canyon, Building 221-F. Readiness to restart the Second Plutonium Cycle process and solvent recovery was assessed. The ORR was conducted by an ORR board of ten members with the support of a subject matter expert. The chairman and four members were drawn from the Operational Safety Evaluation Department, ESH& QA Division; additional members were drawn from other WSRC divisions, independent of the F-Canyon operating division (NMPD). Based on the results of the readiness verification assessments performed according to the ORR plan and the validation of pre-restart corrective actions, the WSRC independent ORR Board has concluded that the facility has achieved the state of readiness committed to in the Restart Plan. Also, based on the scope of the ORR, it is the opinion of the board that F-Canyon Phase 1 processes can be restarted without undue risk to the safety of the public and onsite workers and without undue risk to the environment.

McFarlane, A.F.; Spangler, J.B.

1995-04-05T23:59:59.000Z

355

A Market Analysis of the Ready-To-Assemble Furniture Industry  

E-Print Network (OSTI)

manufacturers in the Macon Ridge Economic Development Region in Northeast Louisiana. The Ready-To-Assemble (RTA. The manufacturing process of RTA furniture after the design stage is basically panel sizing for sides, ends, backs against scratches (7). In addition, recent advances in production machinery have enabled #12;3 producers

356

Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report  

Science Conference Proceedings (OSTI)

This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.

Wight, R.H.

1997-05-30T23:59:59.000Z

357

Capture-Ready Coal Plants -Options, Technologies and Economics Mark C. Bohm1  

E-Print Network (OSTI)

1 Capture-Ready Coal Plants - Options, Technologies and Economics Mark C. Bohm1 , Howard J. Herzog1 be employed during the initial design and construction of a both pulverized coal and integrated gasification the Internet in the summer of 2006 [7]. Introduction Interest in the construction of coal-fired power

358

Capture-ready coal plants--Options, technologies and Mark C. Bohm a  

E-Print Network (OSTI)

Capture-ready coal plants--Options, technologies and economics Mark C. Bohm a , Howard J. Herzog a. Introduction Interest in the construction of coal-fired power generation has increased significantly in recent the construction of coal-fired plants. Worldwide, the installed capacity of coal-fired plants is expected

359

Team leader`s preparation guide for Operational Readiness Reviews (ORR)  

Science Conference Proceedings (OSTI)

This document provides instructions, explanations, and examples for the performance of all phases of an Operational Readiness Review (ORR). Details pertinent to the team leader, team members, and review coordinator are outlined. Sample forms and correspondence are included in appendices. Although this document is for use by DOE ORR team leaders, it can be used by contractor ORR team leaders also.

Not Available

1994-09-01T23:59:59.000Z

360

River Protection Project (RPP) Readiness to Proceed 2 Internal Independent Review Team Final Report  

SciTech Connect

This report describes the results of an independent review team brought in to assess CH2M Hill Hanford Group's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor

SCHAUS, P.S.

2000-03-29T23:59:59.000Z

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

River Protection Project (RPP) Readiness to Proceed 2 Internal Independent Review Team Final Report  

SciTech Connect

This report describes the results of an independent review team brought in to assess CH2M HILL Hanford's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor.

SCHAUS, P.S.

2000-03-15T23:59:59.000Z

362

Focus Sheet | Hazardous Waste Checklist How to be ready for state hazardous waste  

E-Print Network (OSTI)

Focus Sheet | Hazardous Waste Checklist How to be ready for state hazardous waste inspectors. See a hazardous waste inspection. ons, rrosive. n hemicals? ical waste. Waste-like chemicals have als Are you. Are your waste containers properly labeled? us Waste label as soon t Do you accumulate waste in a safe

Wilcock, William

363

Developing a practical framework for ERP readiness assessment using fuzzy analytic network process  

Science Conference Proceedings (OSTI)

Previous studies report unusually high failure in enterprise resource planning (ERP) projects. Thus, it is necessary to perform an assessment at the initial stage of an ERP implementation program to identify weaknesses or problems which may lead to project ... Keywords: Critical success factors (CSF), Enterprise resource planning (ERP), Fuzzy analytic network process, Readiness assessment

Jafar Razmi; Mohamad Sadegh Sangari; Reza Ghodsi

2009-11-01T23:59:59.000Z

364

Sabbath Day Home Automation: "It's Like Mixing Technology and Religion"  

E-Print Network (OSTI)

We present a qualitative study of 20 American Orthodox Jewish families' use of home automation for religious purposes. These lead users offer insight into real-life, long-term experience with home automation technologies. We discuss how automation was seen by participants to contribute to spiritual experience and how participants oriented to the use of automation as a religious custom. We also discuss the relationship of home automation to family life. We draw design implications for the broader population, including surrender of control as a design resource, home technologies that support long-term goals and lifestyle choices, and respite from technology.

Woodruff, Allison; Foucault, Brooke

2007-01-01T23:59:59.000Z

365

Installation and Commissioning Automated Demand Response Systems  

Science Conference Proceedings (OSTI)

Demand Response (DR) can be defined as actions taken to reduce electric loads when contingencies, such as emergencies and congestion, occur that threaten supply-demand balance, or market conditions raise supply costs. California utilities have offered price and reliability DR based programs to customers to help reduce electric peak demand. The lack of knowledge about the DR programs and how to develop and implement DR control strategies is a barrier to participation in DR programs, as is the lack of automation of DR systems. Most DR activities are manual and require people to first receive notifications, and then act on the information to execute DR strategies. Levels of automation in DR can be defined as follows. Manual Demand Response involves a labor-intensive approach such as manually turning off or changing comfort set points at each equipment switch or controller. Semi-Automated Demand Response involves a pre-programmed demand response strategy initiated by a person via centralized control system. Fully-Automated Demand Response does not involve human intervention, but is initiated at a home, building, or facility through receipt of an external communications signal. The receipt of the external signal initiates pre-programmed demand response strategies. We refer to this as Auto-DR (Piette et. al. 2005). Auto-DR for commercial and industrial facilities can be defined as fully automated DR initiated by a signal from a utility or other appropriate entity and that provides fully-automated connectivity to customer end-use control strategies. One important concept in Auto-DR is that a homeowner or facility manager should be able to 'opt out' or 'override' a DR event if the event comes at time when the reduction in end-use services is not desirable. Therefore, Auto-DR is not handing over total control of the equipment or the facility to the utility but simply allowing the utility to pass on grid related information which then triggers facility defined and programmed strategies if convenient to the facility. From 2003 through 2006 Lawrence Berkeley National Laboratory (LBNL) and the Demand Response Research Center (DRRC) developed and tested a series of demand response automation communications technologies known as Automated Demand Response (Auto-DR). In 2007, LBNL worked with three investor-owned utilities to commercialize and implement Auto-DR programs in their territories. This paper summarizes the history of technology development for Auto-DR, and describes the DR technologies and control strategies utilized at many of the facilities. It outlines early experience in commercializing Auto-DR systems within PG&E DR programs, including the steps to configure the automation technology. The paper also describes the DR sheds derived using three different baseline methodologies. Emphasis is given to the lessons learned from installation and commissioning of Auto-DR systems, with a detailed description of the technical coordination roles and responsibilities, and costs.

Global Energy Partners; Pacific Gas and Electric Company; Kiliccote, Sila; Kiliccote, Sila; Piette, Mary Ann; Wikler, Greg; Prijyanonda, Joe; Chiu, Albert

2008-04-21T23:59:59.000Z

366

A new wavelet-based approach for the automated treatment of large sets of lunar occultation data  

E-Print Network (OSTI)

The introduction of infrared arrays for lunar occultations (LO) work and the improvement of predictions based on new deep IR catalogues have resulted in a large increase in the number of observable occultations. We provide the means for an automated reduction of large sets of LO data. This frees the user from the tedious task of estimating first-guess parameters for the fit of each LO lightcurve. At the end of the process, ready-made plots and statistics enable the user to identify sources which appear to be resolved or binary and to initiate their detailed interactive analysis. The pipeline is tailored to array data, including the extraction of the lightcurves from FITS cubes. Because of its robustness and efficiency, the wavelet transform has been chosen to compute the initial guess of the parameters of the lightcurve fit. We illustrate and discuss our automatic reduction pipeline by analyzing a large volume of novel occultation data recorded at Calar Alto Observatory. The automated pipeline package is available from the authors.

O. Fors; A. Richichi; X. Otazu; J. Nunez

2007-11-04T23:59:59.000Z

367

A new wavelet-based approach for the automated treatment of large sets of lunar occultation data  

E-Print Network (OSTI)

The introduction of infrared arrays for lunar occultations (LO) work and the improvement of predictions based on new deep IR catalogues have resulted in a large increase in the number of observable occultations. We provide the means for an automated reduction of large sets of LO data. This frees the user from the tedious task of estimating first-guess parameters for the fit of each LO lightcurve. At the end of the process, ready-made plots and statistics enable the user to identify sources which appear to be resolved or binary and to initiate their detailed interactive analysis. The pipeline is tailored to array data, including the extraction of the lightcurves from FITS cubes. Because of its robustness and efficiency, the wavelet transform has been chosen to compute the initial guess of the parameters of the lightcurve fit. We illustrate and discuss our automatic reduction pipeline by analyzing a large volume of novel occultation data recorded at Calar Alto Observatory. The automated pipeline package is avai...

Fors, O; Otazu, X; Nuez, J

2007-01-01T23:59:59.000Z

368

DAVIC - Distributed Energy Automation via Implicit Communication  

NLE Websites -- All DOE Office Websites (Extended Search)

DAVIC - Distributed Energy Automation via Implicit Communication DAVIC - Distributed Energy Automation via Implicit Communication Speaker(s): Peter Palensky Date: January 22, 2008 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Peng Xu The electricity grid is seen as a wide-area distributed process, determined by its sub-processes - in our case the loads and distributed generation. Network-based coordination needs to be done very carefully and properly timed to avoid instabilities. Luckily, every point of the grid has the same grid frequency and the same time. Integrating these two trivial things (implicit communication) into one consistent communication model might complement a low-quality (explicit) best-effort communication channel (e.g. Internet, GPRS) for real time applications. A simulation shall clarify how

369

home automation | OpenEI Community  

Open Energy Info (EERE)

91 91 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142285591 Varnish cache server home automation Home Graham7781's picture Submitted by Graham7781(2002) Super contributor 23 January, 2013 - 13:57 The Consumer Electronics Show round-up CES electronics home automation Las Vegas OpenEI Smart Grid Every January, Las Vegas hosts the Consumer Electronics Show. The CES is the world's largest technology-related trade show. The highlights of this year's show were OLED TVs, ultra-thin laptops,

370

Definition: Automated Voltage Regulators | Open Energy Information  

Open Energy Info (EERE)

Regulators Regulators Jump to: navigation, search Dictionary.png Automated Voltage Regulators Voltage regulators are transformers that can increase or decrease the voltage on a distribution circuit to help keep the voltage within a pre-determined band. Unlike capacitor banks, voltage regulators cannot adjust power factor. These devices typically monitor the voltage at the location where they are connected, and compare it to a programmed set point. If the voltage deviates too far from the set point, the voltage regulator can increase or decrease its output voltage by moving the tap on the secondary side up or down. An automated voltage regulator can operate with remote control signals, or in concert with other area voltage control devices, to help regulate distribution voltage in a coordinated fashion.

371

Automated Hydroforming of Seamless Superconducting RF Cavity  

SciTech Connect

We are studying the possibility of automated hydroforming process for seamless superconducting RF cavities. Preliminary hydroforming tests of three-cell cavities from seamless tubes made of C1020 copper have been performed. The key point of an automated forming is to monitor and strictly control some parameters such as operation time, internal pressure and material displacements. Especially, it is necessary for our studies to be able to control axial and radial deformation independently. We plan to perform the forming in two stages to increase the reliability of successful forming. In the first stage hydroforming by using intermediate constraint dies, three-cell cavities were successfully formed in less than 1 minute. In parallel, we did elongation tests on cavity-quality niobium and confirmed that it is possible to achieve an elongation of >64% in 2 stages that is required for our forming of 1.3 GHz cavities.

Nagata, Tomohiko [ULVAC, Inc.; Shinozawa, Seiichi [ULVAC, Inc.; Abe, Noriyuki [ULVAC, Inc.; Nagakubo, Junki [ULVAC, Inc.; Murakami, Hirohiko [ULVAC, Inc.; Tajima, Tsuyoshi [Los Alamos National Laboratory; Inoue, Hitoshi [High Energy Accelerator Research Organization, KEK; Yamanaka, Masashi [High Energy Accelerator Research Organization, KEK; Ueno, Kenji [High Energy Accelerator Research Organization, KEK

2012-07-31T23:59:59.000Z

372

Automation impact study of Army Training Management  

SciTech Connect

The main objectives of this impact study were to identify the potential cost savings associated with automated Army Training Management (TM), and to perform a cost-benefit analysis for an Army-wide automated TM system. A subsidiary goal was to establish baseline data for an independent evaluation of a prototype Integrated Training Management System (ITMS), to be tested in the fall of 1988. A structured analysis of TM doctrine was performed for comparison with empirical data gathered in a job analysis survey of selected units of the 9ID (MTZ) at Ft. Lewis, Washington. These observations will be extended to other units in subsequent surveys. The survey data concerning staffing levels and amount of labor expended on eight distinct TM tasks were analyzed in a cost effectiveness model. The main results of the surveys and cost effectiveness modelling are summarized. 18 figs., 47 tabs.

Sanquist, T.F.; Schuller, C.R.; McCallum, M.C.; Underwood, J.A.; Bettin, P.J.; King, J.L.; Melber, B.D.; Hostick, C.J.; Seaver, D.A.

1988-01-01T23:59:59.000Z

373

Flow through electrode with automated calibration  

DOE Patents (OSTI)

The present invention is an improved automated flow through electrode liquid monitoring system. The automated system has a sample inlet to a sample pump, a sample outlet from the sample pump to at least one flow through electrode with a waste port. At least one computer controls the sample pump and records data from the at least one flow through electrode for a liquid sample. The improvement relies upon (a) at least one source of a calibration sample connected to (b) an injection valve connected to said sample outlet and connected to said source, said injection valve further connected to said at least one flow through electrode, wherein said injection valve is controlled by said computer to select between said liquid sample or said calibration sample. Advantages include improved accuracy because of more frequent calibrations, no additional labor for calibration, no need to remove the flow through electrode(s), and minimal interruption of sampling.

Szecsody, James E [Richland, WA; Williams, Mark D [Richland, WA; Vermeul, Vince R [Richland, WA

2002-08-20T23:59:59.000Z

374

A Modular Architecture for Building Automation Systems  

E-Print Network (OSTI)

The deployment of building automation systems (BAS) allows to increase comfort, safety and security and to reduce operational cost. Today such systems typically follow a two-layered hierarchical approach. While control networks interconnect distributed sensors, actuators and controllers, a backbone provides the necessary infrastructure for management tasks hosted by configuration and management devices. In addition, devices interconnecting the control network with the backbone and the backbone with further networks (e.g., the Internet) play a strategic role. All BAS devices contributing to a particular functionality differ in their requirements for hardware. This paper discusses requirements for devices used in the building automation domain and presents our work in progress to assemble platforms with different purposes relying on a modular architecture. 1

Wolfgang Granzer; Wolfgang Kastner; Georg Neugschw; Fritz Praus

2006-01-01T23:59:59.000Z

375

Algorithms to Automate LCLS Undulator Tuning  

Science Conference Proceedings (OSTI)

Automation of the LCLS undulator tuning offers many advantages to the project. Automation can make a substantial reduction in the amount of time the tuning takes. Undulator tuning is fairly complex and automation can make the final tuning less dependent on the skill of the operator. Also, algorithms are fixed and can be scrutinized and reviewed, as opposed to an individual doing the tuning by hand. This note presents algorithms implemented in a computer program written for LCLS undulator tuning. The LCLS undulators must meet the following specifications. The maximum trajectory walkoff must be less than 5 {micro}m over 10 m. The first field integral must be below 40 x 10{sup -6} Tm. The second field integral must be below 50 x 10{sup -6} Tm{sup 2}. The phase error between the electron motion and the radiation field must be less than 10 degrees in an undulator. The K parameter must have the value of 3.5000 {+-} 0.0005. The phase matching from the break regions into the undulator must be accurate to better than 10 degrees. A phase change of 113 x 2{pi} must take place over a distance of 3.656 m centered on the undulator. Achieving these requirements is the goal of the tuning process. Most of the tuning is done with Hall probe measurements. The field integrals are checked using long coil measurements. An analysis program written in Matlab takes the Hall probe measurements and computes the trajectories, phase errors, K value, etc. The analysis program and its calculation techniques were described in a previous note. In this note, a second Matlab program containing tuning algorithms is described. The algorithms to determine the required number and placement of the shims are discussed in detail. This note describes the operation of a computer program which was written to automate LCLS undulator tuning. The algorithms used to compute the shim sizes and locations are discussed.

Wolf, Zachary

2010-12-03T23:59:59.000Z

376

Automated Methods for Multiplexed Pathogen Detection  

Science Conference Proceedings (OSTI)

Detection of pathogenic microorganisms in environmental samples is a difficult process. Concentration of the organisms of interest also co-concentrates inhibitors of many end-point detection methods, notably, nucleic acid methods. In addition, sensitive, highly multiplexed pathogen detection continues to be problematic. The primary function of the BEADS (Biodetection Enabling Analyte Delivery System) platform is the automated concentration and purification of target analytes from interfering substances, often present in these samples, via a renewable surface column. In one version of BEADS, automated immunomagnetic separation (IMS) is used to separate cells from their samples. Captured cells are transferred to a flow-through thermal cycler where PCR, using labeled primers, is performed. PCR products are then detected by hybridization to a DNA suspension array. In another version of BEADS, cell lysis is performed, and community RNA is purified and directly labeled. Multiplexed detection is accomplished by direct hybridization of the RNA to a planar microarray. The integrated IMS/PCR version of BEADS can successfully purify and amplify 10 E. coli O157:H7 cells from river water samples. Multiplexed PCR assays for the simultaneous detection of E. coli O157:H7, Salmonella, and Shigella on bead suspension arrays was demonstrated for the detection of as few as 100 cells for each organism. Results for the RNA version of BEADS are also showing promising results. Automation yields highly purified RNA, suitable for multiplexed detection on microarrays, with microarray detection specificity equivalent to PCR. Both versions of the BEADS platform show great promise for automated pathogen detection from environmental samples. Highly multiplexed pathogen detection using PCR continues to be problematic, but may be required for trace detection in large volume samples. The RNA approach solves the issues of highly multiplexed PCR and provides ''live vs. dead'' capabilities. However, sensitivity of the method will need to be improved for RNA analysis to replace PCR.

Straub, Tim M.; Dockendorff, Brian P.; Quinonez-Diaz, Maria D.; Valdez, Catherine O.; Shutthanandan, Janani I.; Tarasevich, Barbara J.; Grate, Jay W.; Bruckner-Lea, Cindy J.

2005-09-01T23:59:59.000Z

377

Energy Automation Systems Inc | Open Energy Information  

Open Energy Info (EERE)

Energy Automation Systems Inc Energy Automation Systems Inc Jump to: navigation, search Name Energy Automation Systems Inc. Place Hendersonville, Tennessee Zip 37075 Sector Buildings, Efficiency Product An energy efficiency consultancy firm focusing on analysis of energy consumption in buildings and providing improvments in the efficiency of the distribution system and equipment loads, similar to an ESCO. Coordinates 36.304861°, -86.620214° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.304861,"lon":-86.620214,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

378

Home Network Technologies and Automating Demand Response  

Science Conference Proceedings (OSTI)

Over the past several years, interest in large-scale control of peak energy demand and total consumption has increased. While motivated by a number of factors, this interest has primarily been spurred on the demand side by the increasing cost of energy and, on the supply side by the limited ability of utilities to build sufficient electricity generation capacity to meet unrestrained future demand. To address peak electricity use Demand Response (DR) systems are being proposed to motivate reductions in electricity use through the use of price incentives. DR systems are also be design to shift or curtail energy demand at critical times when the generation, transmission, and distribution systems (i.e. the 'grid') are threatened with instabilities. To be effectively deployed on a large-scale, these proposed DR systems need to be automated. Automation will require robust and efficient data communications infrastructures across geographically dispersed markets. The present availability of widespread Internet connectivity and inexpensive, reliable computing hardware combined with the growing confidence in the capabilities of distributed, application-level communications protocols suggests that now is the time for designing and deploying practical systems. Centralized computer systems that are capable of providing continuous signals to automate customers reduction of power demand, are known as Demand Response Automation Servers (DRAS). The deployment of prototype DRAS systems has already begun - with most initial deployments targeting large commercial and industrial (C & I) customers. An examination of the current overall energy consumption by economic sector shows that the C & I market is responsible for roughly half of all energy consumption in the US. On a per customer basis, large C & I customers clearly have the most to offer - and to gain - by participating in DR programs to reduce peak demand. And, by concentrating on a small number of relatively sophisticated energy consumers, it has been possible to improve the DR 'state of the art' with a manageable commitment of technical resources on both the utility and consumer side. Although numerous C & I DR applications of a DRAS infrastructure are still in either prototype or early production phases, these early attempts at automating DR have been notably successful for both utilities and C & I customers. Several factors have strongly contributed to this success and will be discussed below. These successes have motivated utilities and regulators to look closely at how DR programs can be expanded to encompass the remaining (roughly) half of the state's energy load - the light commercial and, in numerical terms, the more important residential customer market. This survey examines technical issues facing the implementation of automated DR in the residential environment. In particular, we will look at the potential role of home automation networks in implementing wide-scale DR systems that communicate directly to individual residences.

McParland, Charles

2009-12-01T23:59:59.000Z

379

Joint Actinide Shock Physics Experimental Research Facility Restart Operational Readiness Review Pre- Visit  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NNSS-2011-04-28 NNSS-2011-04-28 Site: Nevada National Security Site Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Joint Actinide Shock Physics Experimental Research Facility Restart Operational Readiness Review Pre- Visit Dates of Activity: 04/25/2011 - 04/28/2011 Report Preparer William Macon Activity Description/Purpose: In coordination with the National Nuclear Security Administration (NNSA) Service Center, the Office of Health, Safety and Security (HSS) site lead participated in a pre-visit for the NNSA Operational Readiness Review (ORR) of the Joint Actinide Shock Physics Experimental Research (JASPER) facility restart conducted April 25-28, 2011. The site lead also participated

380

Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 2 (CDP)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PRELIMINARY TECHNOLOGY PRELIMINARY TECHNOLOGY OF THE CALCINE Prepared by the U.S. Department of Energy ECHNOLOGY READINESS ASSESSMENT ALCINE DISPOSITION PROJECT VOLUME TWO Anthony F. Kluk Hoyt C. Johnson Clyde Phillip McGinnis Michael Rinker Steven L. Ross Herbert G. Sutter John Vienna February 2011 Prepared by the U.S. Department of Energy Washington, DC SSESSMENT ROJECT 412.09 (06/03/2009 - Rev. 11) CALCINE DISPOSITION PROJECT TECHNOLOGY MATURATION PLAN Identifier: Revision*: Page: PLN-1482 2 C-1 of C-317 Appendix C Appendix C Checklists for Critical Technology Elements and Technology Readiness Levels This appendix provides the CTE and TRL checklists for the CTEs. For the TRL questions that receive a "Y" (yes) response, the supporting documentation is provided with a complete reference at the

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Technology Readiness Assessment (TRA)/Technology Maturation Plan (TMP) Process Guide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U U U . . S S . . D D e e p p a a r r t t m m e e n n t t o o f f E E n n e e r r g g y y O O f f f f i i c c e e o o f f E E n n v v i i r r o o n n m m e e n n t t a a l l M M a a n n a a g g e e m m e e n n t t Technology Readiness Assessment (TRA) / Technology Maturation Plan (TMP) Process Guide March 2008 U.S. DOE Office of Environmental Management March 2008 TRA/TMP Process Guide Page 2 of 48 TABLE OF CONTENTS 1.0 INTRODUCTION ...................................................................................................................... 4 1.1 Document Purpose............................................................................................................................ 4 2.0 OVERVIEW OF TECHNOLOGY READINESS ASSESSMENTS AND TECHNOLOGY MATURATION PLANS ............................................................................................................

382

DOE handbook: Guide to good practices for operational readiness reviews (ORR) team leader`s guide  

SciTech Connect

This guidance section provides instructions, explanations and examples for the performance of all phases of an Operational Readiness Review (ORR). Details pertinent to the Team Leader (TL), Team Members (TM) and Review Coordinator (RC) are outlined. An appendix contains sample forms and correspondence which are typically used to initiate and perform the ORR. Although this document was written specifically for use by DOE ORR Team Leaders, its use may also be beneficial to contractor ORR Team Leaders. The handbook is also useful for Team Leaders of Readiness Assessments conducted in accordance with requirements of DOE O 425.1. Lessons learned, which are promulgated with this handbook, will benefit any line manager, particularly those preparing a facility or process for startup or restart.

NONE

1994-09-01T23:59:59.000Z

383

Are We Ready to Propose Guidelines for Health-Based Ventilation?  

NLE Websites -- All DOE Office Websites (Extended Search)

Are We Ready to Propose Guidelines for Health-Based Ventilation? Are We Ready to Propose Guidelines for Health-Based Ventilation? Speaker(s): Pawel Wargocki Date: October 14, 2013 - 12:00pm - 1:00pm Location: 90-3122 Seminar Host/Point of Contact: Mark Mendell Guidelines for health-based ventilation in Europe are proposed. They follow the premise of controlling exposures to indoor air pollutants of both indoor and outdoor origin. Exposures are controlled through a two-step sequential approach, in which source control is the primary strategy, while ventilation is the secondary strategy once all options for source control have been fully implemented. World Health Organization (WHO) air quality (AQ) guidelines are used to set the exposure limits. A decision diagram is created for guidance through the process of source control and to aid in

384

V-132: IBM Tivoli System Automation Application Manager Multiple  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: IBM Tivoli System Automation Application Manager Multiple 2: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities V-132: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities April 12, 2013 - 6:00am Addthis PROBLEM: IBM has acknowledged multiple vulnerabilities in IBM Tivoli System Automation Application Manager PLATFORM: The vulnerabilities are reported in IBM Tivoli System Automation Application Manager versions 3.1, 3.2, 3.2.1, and 3.2.2 ABSTRACT: Multiple security vulnerabilities exist in the IBM Java Runtime Environment component of IBM Tivoli System Automation Application Manager which may affect the product REFERENCE LINKS: Secunia Advisory: SA53006 IBM Security Bulletin 21633991 IBM Security Bulletin 21633992 CVE-2011-3563 CVE-2012-0497 CVE-2012-0498 CVE-2012-0499 CVE-2012-0501

385

V-132: IBM Tivoli System Automation Application Manager Multiple  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: IBM Tivoli System Automation Application Manager Multiple 2: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities V-132: IBM Tivoli System Automation Application Manager Multiple Vulnerabilities April 12, 2013 - 6:00am Addthis PROBLEM: IBM has acknowledged multiple vulnerabilities in IBM Tivoli System Automation Application Manager PLATFORM: The vulnerabilities are reported in IBM Tivoli System Automation Application Manager versions 3.1, 3.2, 3.2.1, and 3.2.2 ABSTRACT: Multiple security vulnerabilities exist in the IBM Java Runtime Environment component of IBM Tivoli System Automation Application Manager which may affect the product REFERENCE LINKS: Secunia Advisory: SA53006 IBM Security Bulletin 21633991 IBM Security Bulletin 21633992 CVE-2011-3563 CVE-2012-0497 CVE-2012-0498 CVE-2012-0499 CVE-2012-0501

386

Southern California Edison: A Cross-Functional Approach to PEV Readiness  

Science Conference Proceedings (OSTI)

Southern California Edison (SCE) has supported the market introduction of plug-in electric vehicles (PEVs) since the early 1990s, mostly through research, development, and demonstration efforts and its nationally recognized EV Technical Center. In 2009, with the market reintroduction of battery electric vehicles (BEVs) and the new arrival of plug-in hybrid electric vehicles (PHEVs), SCE launched its PEV Readiness Program.The utility has benefited from having retained a longstanding ...

2013-06-28T23:59:59.000Z

387

San Diego Gas & Electric: Leading the Region to Electric Vehicle Readiness  

Science Conference Proceedings (OSTI)

Long before The EV Project announcement in 2009, SDG&E knew through its relationships with Nissan and General Motors (GM) that the automakers would bring PEVs to market. The utility knew it needed to lead the greater community to PEV readiness by working with all stakeholders. Together they would help PEV customers make informed purchasing decisions and realize all the benefits of electric transportation.

2013-08-31T23:59:59.000Z

388

What Does Open-Data-Ready Look Like? Jeff Kaplan Senior Consultant, ICT Unit, Open ePolicy Solutions  

NLE Websites -- All DOE Office Websites (Extended Search)

Does Open-Data-Ready Does Open-Data-Ready Look Like? Jeff Kaplan - Senior Consultant, ICT Unit, Open ePolicy Solutions Email: jeff@openesolutions.com Twitter: @jeffkaplan88 Andrew Stott - UK Transparency Board, former UK Deputy CIO Email: andrew.stott@dirdigeng.com Twitter: @DirDigEng Workshop Intro 1. Workshop objective: Tool to assess readiness for an Open Data initiative 2. Why develop it? 3. How to develop it? 4. How to use it? Open Data Ecosystem Open Data Possible Readiness Categories Political leadership * Skills inside government * Skills outside government Policy & Legal Framework Financial requirements & funding * Organization & management in government * State of Data within government Demand for Data / Engagement Technical infrastructure requirements Reuse

389

Technology and Manufacturing Readiness of Early Market Motive and Non-Motive Hydrogen Storage Technologies for Fuel Cell Applications  

SciTech Connect

PNNLs objective in this report is to provide DOE with a technology and manufacturing readiness assessment to identify hydrogen storage technologies maturity levels for early market motive and non-motive applications and to provide a path forward toward commercialization. PNNLs Technology Readiness Assessment (TRA) is based on a combination of Technology Readiness Level (TRL) and Manufacturing Readiness Level (MRL) designations that enable evaluation of hydrogen storage technologies in varying levels of development. This approach provides a logical methodology and roadmap to enable the identification of hydrogen storage technologies, their advantages/disadvantages, gaps and R&D needs on an unbiased and transparent scale that is easily communicated to interagency partners. The TRA report documents the process used to conduct the TRA, reports the TRL and MRL for each assessed technology and provides recommendations based on the findings.

Ronnebro, Ewa

2012-06-16T23:59:59.000Z

390

15 Blog Posts to Get You Ready for Winter Savings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15 Blog Posts to Get You Ready for Winter Savings 15 Blog Posts to Get You Ready for Winter Savings 15 Blog Posts to Get You Ready for Winter Savings October 13, 2009 - 1:25pm Addthis Allison Casey Senior Communicator, NREL On Saturday, I woke up to three inches of snow on the ground. THREE INCHES! On October 10th! Despite having grown up in what one of my college roommates lovingly referred to as the "TUNDRA!" (a.k.a, Wisconsin, and yes, she spoke this word in horrified all-caps), I am opposed to winter. I mean, I get that winter should not go away. Climate change is bad. And things like skiing, ice skating, snow forts, and hot chocolate do make winter a bit more bearable. But it's just so... cold. And icy. And dark. Unfortunately, hibernation isn't really an option, and-in addition to extra doses of whining from yours truly-all of those cold, dark days can

391

File:CCS EA 2012 Web-ready.pdf | Open Energy Information  

Open Energy Info (EERE)

CCS EA 2012 Web-ready.pdf CCS EA 2012 Web-ready.pdf Jump to: navigation, search File File history File usage Metadata File:CCS EA 2012 Web-ready.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 3.74 MB, MIME type: application/pdf, 77 pages) Summary Coyote Canyon South Geothermal Exploration EA from 2012 Licensing PD This file has been released into the public domain by the copyright holder, its copyright has expired, or it is ineligible for copyright. This applies worldwide.

392

Definition: Automated Islanding And Reconnection | Open Energy Information  

Open Energy Info (EERE)

Islanding And Reconnection Islanding And Reconnection Jump to: navigation, search Dictionary.png Automated Islanding And Reconnection Automated Islanding and Reconnection Automated islanding and reconnection is achieved by automated separation and subsequent reconnection (autonomous synchronization) of an independently operated portion of the T&D system (i.e., microgrid) from the interconnected electric grid. A microgrid is an integrated energy system consisting of interconnected loads and distributed energy resources which, as an integrated system, can operate in parallel with the grid or as an island.[1] View on Wikipedia Wikipedia Definition Islanding refers to the condition in which a distributed (DG) generator continues to power a location even though electrical grid power

393

EL Program: Next-Generation Robotics and Automation  

Science Conference Proceedings (OSTI)

... and automation technologies for smart manufacturing and cyber-physical systems ... robotics technology holds the potential to transform the future of ...

2013-01-02T23:59:59.000Z

394

Results and commissioning issues from an automated demand response pilot  

E-Print Network (OSTI)

Conference on Building Commissioning. May 2002. Motegi,et al: Results and Commissioning Issues from an AutomatedConference on Building Commissioning: May 1e-20, 2004

Piette, Mary Ann; Watson, Dave; Sezgen, Osman; Motegi, Naoya

2004-01-01T23:59:59.000Z

395

Safety Aware Platooning of Automated Electric Transport Vehicles.  

E-Print Network (OSTI)

??Safety is a paramount concern when considering implementation of an automated highway where computers control the vehicles. Even with computer-fast reaction time there is inevitably (more)

Jackson, Spencer Scott

2013-01-01T23:59:59.000Z

396

Direct versus Facility Centric Load Control for Automated Demand Response  

E-Print Network (OSTI)

Interoperable Automated Demand Response Infrastructure.and Techniques for Demand Response. LBNL Report 59975. Mayand Communications for Demand Response and Energy Efficiency

Piette, Mary Ann

2010-01-01T23:59:59.000Z

397

Linking Continuous Energy Management and Open Automated Demand Response  

E-Print Network (OSTI)

A. Barat, D. Watson. Demand Response Spinning ReserveOpen Automated Demand Response Communication Standards:Dynamic Controls for Demand Response in a New Commercial

Piette, Mary Ann

2009-01-01T23:59:59.000Z

398

Northwest Open Automated Demand Response Technology Demonstration Project  

E-Print Network (OSTI)

reliability signals for demand response GTA HTTPS HVAC IT kWand Commissioning Automated Demand Response Systems. and Techniques for Demand Response. California Energy

Kiliccote, Sila

2010-01-01T23:59:59.000Z

399

Measurement and evaluation techniques for automated demand response demonstration  

E-Print Network (OSTI)

Development for Demand Response Calculation Findings andManagement and Demand Response in Commercial Buildings. of Fully Automated Demand Response in Large Facilities.

Motegi, Naoya; Piette, Mary Ann; Watson, David S.; Sezgen, Osman; ten Hope, Laurie

2004-01-01T23:59:59.000Z

400

Industrial SPP/Partner Teaming Profile - Rockwell Automation  

NLE Websites -- All DOE Office Websites (Extended Search)

the system at 14 General Mills facilities. Project Summary The project was to design an EMS for dramatically different AHUs. Rockwell Automation worked with General Mills...

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Automated Diagnostics and Soft-Repair for Smart Homes  

NLE Websites -- All DOE Office Websites (Extended Search)

Automated fault detection and diagnosis (AFDD) (<<1%) *&1; Around-the-clock protection and optimization *&1; Energy savings and longer equipment life *&1; Condition-based maintenance...

402

Automated Soil Gas Monitoring Chamber - Oak Ridge National ...  

Automated Soil Gas Monitoring Chamber ... A chamber for trapping soil gases as they evolve from the soil without disturbance to the soil and to the natural

403

HEADLINE: DOE Pursues Automation in West Virginia Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

assigned to their definition of a Smart Grid. So, what exactly does this Smart Grid distribution automation system look like? As always, interoperability is a factor. First, it's...

404

Influence of Agricultural Dual Credit on Student College Readiness Self-Efficacy  

E-Print Network (OSTI)

The purpose of this correlational and descriptive study was to examine the influence of an agricultural dual credit course curriculum on student self-efficacy of college readiness as students matriculate to post-secondary education. To evaluate the personal characteristics, postsecondary plans, program perceptions and college readiness self-efficacy, a quantitative survey and online instrument was used to gather data and analyze information on high school students enrolled in agricultural education in both dual credit and non-dual credit courses primarily in the Middle Tennessee Region. The target population (N = 543) for this study was defined as students at 16 schools where the dual credit course was offered with the Middle Tennessee State University, School of Agribusiness and Agriscience in the 2011-2012 academic year. A total of 245 students from 16 secondary agricultural programs in seven different school districts across Tennessee, primarily in the Middle Tennessee region, participated in the study for a response rate of approximately 45%. This study examined college readiness of student participation in an agricultural dual credit course and sought to determine the relationship between student participation in a dual credit course offering and college readiness self-efficacy as well as student perceptions of the course offering. Course self-efficacy was higher among dual credit participants versus non-dual credit participants. Social self-efficacy was also higher for dual credit participants. Females had higher Course self-efficacy, and there was a positive relationship between GPA and each construct of the college readiness self-efficacy inventory. Participant perceptions of the agricultural dual credit program were also high. This study indicates that dual credit participants can confidently approach post-secondary options, and that they are more likely to be successful in college due to level of self-efficacy as they matriculate into college. Recommendations from the study include: Using the MTSU dual credit model in future dual credit course developments and collaborations; using findings as a basis for training future agricultural education teachers on how to improve CRSE; and additional and longitudinal studies to track dual credit students success in college.

Neely, Alanna L.

2013-08-01T23:59:59.000Z

405

Nuclear Energy Readiness Indicator Index (NERI): A benchmarking tool for assessing nuclear capacity in developing countries  

Science Conference Proceedings (OSTI)

Declining natural resources, rising oil prices, looming climate change and the introduction of nuclear energy partnerships, such as GNEP, have reinvigorated global interest in nuclear energy. The convergence of such issues has prompted countries to move ahead quickly to deal with the challenges that lie ahead. However, developing countries, in particular, often lack the domestic infrastructure and public support needed to implement a nuclear energy program in a safe, secure, and nonproliferation-conscious environment. How might countries become ready for nuclear energy? What is needed is a framework for assessing a country's readiness for nuclear energy. This paper suggests that a Nuclear Energy Readiness Indicator (NERI) Index might serve as a meaningful basis for assessing a country's status in terms of progress toward nuclear energy utilization under appropriate conditions. The NERI Index is a benchmarking tool that measures a country's level of 'readiness' for nonproliferation-conscious nuclear energy development. NERI first identifies 8 key indicators that have been recognized by the International Atomic Energy Agency as key nonproliferation and security milestones to achieve prior to establishing a nuclear energy program. It then measures a country's progress in each of these areas on a 1-5 point scale. In doing so NERI illuminates gaps or underdeveloped areas in a country's nuclear infrastructure with a view to enable stakeholders to prioritize the allocation of resources toward programs and policies supporting international nonproliferation goals through responsible nuclear energy development. On a preliminary basis, the indicators selected include: (1) demonstrated need; (2) expressed political support; (3) participation in nonproliferation and nuclear security treaties, international terrorism conventions, and export and border control arrangements; (4) national nuclear-related legal and regulatory mechanisms; (5) nuclear infrastructure; (6) the utilization of IAEA technical assistance; (7) participation in regional arrangements; and (8) public support for nuclear power. In this paper, the Index aggregates the indicators and evaluates and compares the level of readiness in seven countries that have recently expressed various degrees of interest in establishing a nuclear energy program. The NERI Index could be a valuable tool to be utilized by: (1) country officials who are considering nuclear power; (2) the international community, desiring reassurance of a country's capacity for the peaceful, safe, and secure use of nuclear energy; (3) foreign governments/NGO's, seeking to prioritize and direct resources toward developing countries; and (4) private stakeholders interested in nuclear infrastructure investment opportunities.

Saum-Manning,L.

2008-07-13T23:59:59.000Z

406

The Effects of Structured Work Experience on the Work-Readiness Skills of Students with Disabilities  

E-Print Network (OSTI)

It is common knowledge that employment is a large part of participation in society for all adults; and, one role of public education is to prepare students for these adult roles. Despite increasing school accountability measures for post-school outcomes of students with disabilities, a significant gap in employment between those with and those without disabilities remains. Work experience during high school has been established as the most consistent predictor of post-school employment. The problem is the lack of intervention research demonstrating ways of implementing programs that are associated with acquisition of work-readiness skills. The purpose of this study was to investigate the effects of structured work experience on the work-readiness skills of students with disabilities, and examine whether or not disability, or type of program, affected student outcomes while controlling for number of participant contact hours. To accomplish this purpose, a quasi- experimental one-group pretest-posttest design was selected and used. The target population for this study was high school students with disabilities in three high schools in Texas. The final sample included 37 students. The Becker Work Adjustment Profile: 2 was the instrument used to measure the participants work-readiness skills. The pretest was administered within two weeks of student entry into the program. The posttest was administered within two weeks of student exit from the program. Descriptive and inferential analyses were conducted to answer the primary and exploratory research questions. Inferential analyses included a dependent sample t test and an ANCOVA using number of participant contact hours as the covariate. Results indicated participation in a structured work experience program had a positive effect on the work-readiness skills of these participants. ANCOVA results indicated (a) disability type was not a significant factor affecting the work-readiness of the participants, (b) program type produced a statistically significant main effect, (c) there was no statistically significant interaction effect between disability type and program type, and (d) number of contact hours produced a statistically significant main effect. Future research studies should focus on replication of the current study results and examination of the long-term effects of participation in structured work experience programs on post-school outcomes.

Pacha, Jacqueline K

2013-05-01T23:59:59.000Z

407

PUCK: an automated prompting system for smart environments: toward achieving automated prompting--challenges involved  

Science Conference Proceedings (OSTI)

The growth in popularity of smart environments has been quite steep in the last decade and so has the demand for smart health assistance systems. A smart home-based prompting system can enhance these technologies to deliver in-home interventions to users ... Keywords: Automated prompting, Imbalanced class distribution, Machine learning, Prompting systems, Smart environments

Barnan Das; Diane J. Cook; Maureen Schmitter-Edgecombe; Adriana M. Seelye

2012-10-01T23:59:59.000Z

408

AUTOMATED PROCESS MONITORING: APPLYING PROVEN AUTOMATION TECHNIQUES TO INTERNATIONAL SAFEGUARDS NEEDS  

SciTech Connect

Identification and quantification of specific alpha- and beta-emitting radionuclides in complex liquid matrices is highly challenging, and is typically accomplished through laborious wet chemical sample preparation and separations followed by analysis using a variety of detection methodologies (e.g., liquid scintillation, gas proportional counting, alpha energy analysis, mass spectrometry). Analytical results may take days or weeks to report. Chains of custody and sample security measures may also complicate or slow the analytical process. When an industrial process-scale plant requires the monitoring of specific radionuclides as an indication of the composition of its feed stream or of plant performance, radiochemical measurements must be fast, accurate, and reliable. Scientists at Pacific Northwest National Laboratory have assembled a fully automated prototype Process Monitor instrument capable of a variety of tasks: automated sampling directly from a feed stream, sample digestion / analyte redox adjustment, chemical separations, radiochemical detection and data analysis / reporting. The system is compact, its components are fluidically inter-linked, and analytical results could be immediately transmitted to on- or off-site locations. The development of a rapid radiochemical Process Monitor for 99Tc in Hanford tank waste processing streams, capable of performing several measurements per hour, will be discussed in detail. More recently, the automated platform was modified to perform measurements of 90Sr in Hanford tank waste stimulant. The system exemplifies how automation could be integrated into reprocessing facilities to support international nuclear safeguards needs.

O'Hara, Matthew J.; Durst, Philip C.; Grate, Jay W.; Devol, Timothy A.; Egorov, Oleg; Clements, John P.

2008-07-13T23:59:59.000Z

409

Automated Knowledge Annotation for Dynamic Collaborative Environments  

Science Conference Proceedings (OSTI)

This paper describes the Knowledge Encapsulation Framework (KEF), a suite of tools to enable automated knowledge annotation for modeling and simulation projects. This framework can be used to capture evidence (e.g., facts extracted from journal articles and government reports), discover new evidence (from similar peer-reviewed material as well as social media), enable discussions surrounding domain-specific topics and provide automatically generated semantic annotations for improved corpus investigation. The current KEF implementation is presented within a wiki environment, providing a simple but powerful collaborative space for team members to review, annotate, discuss and align evidence with their modeling frameworks.

Cowell, Andrew J.; Gregory, Michelle L.; Marshall, Eric J.; McGrath, Liam R.

2009-05-19T23:59:59.000Z

410

Honeywell Modular Automation System Computer Software Documentation  

SciTech Connect

The purpose of this Computer Software Document (CSWD) is to provide configuration control of the Honeywell Modular Automation System (MAS) in use at the Plutonium Finishing Plant (PFP). This CSWD describes hardware and PFP developed software for control of stabilization furnaces. The Honeywell software can generate configuration reports for the developed control software. These reports are described in the following section and are attached as addendum's. This plan applies to PFP Engineering Manager, Thermal Stabilization Cognizant Engineers, and the Shift Technical Advisors responsible for the Honeywell MAS software/hardware and administration of the Honeywell System.

STUBBS, A.M.

2000-12-04T23:59:59.000Z

411

Automated flow-temperature-humidity control system  

SciTech Connect

An automated system that controls air flow, temperature, and humidity was developed from a commercially available temperature-humidity indicator and a specially built flow-temperature-humidity control module. Parameters are set using direct-reading dials on the control module. The air flow is maintained using a mass-flow controller while process controllers connected to the indicator regulate humidity and temperature. The system will run indefinitely without need for operator intervention. If the module and indicator are calibrated properly, accurate air flows (+-2% of full scale), temperatures (+-0.3/sup 0/C), and humidities (+-2% RH) can be achieved.

Nelson, G.O.; Taylor, R.D.

1980-10-01T23:59:59.000Z

412

Evaluatoni of Automated Utility Bill Calibration Methods  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Evaluation of Automated Utility Bill Calibration Methods BA Technical Update Meeting Ben Polly, Joe Robertson 04/30/13 Utility Bill Calibration * "Calibrate" or "true-up" building energy models to utility bill data to increase the accuracy of retrofit savings predictions * Calibration methods typically involve adjusting input parameters * Predict retrofit savings using the adjusted (calibrated) model 2 Background: BESTEST-EX * BESTEST-EX is a suite for testing calibration methods and retrofit savings predictions associated with audit software * Field trials showed that:

413

Formal Verification of Safety Automation Logic Designs  

E-Print Network (OSTI)

In safety critical processes, especially in nuclear power plants, the new digitalized automation (I&C) systems have brought out new needs for safety evaluation. The programmable digital logic controllers can perform complicated control tasks and, thus, their comprehensive verification against safety requirements is a difficult task. Model checking is a promising approach that enables complete verification of a logic design when a finite state machine model of the control logic is available. The paper describes the use of model checking for the verification of an arc protection system and summarizes experiences of utilizing model checking in automation design and verification. For the verification of the arc protection system, it was necessary to model the overall design of the system and its operation environment. The environment model could be kept relatively simple while covering the essential behaviour of the environment. The results show that it is possible to reliably verify the presence of a desired or the absence of an undesired behaviour of the system. The possibility of complete verification makes model checking different from simulation based testing where only selected schemes can be simulated and one can never be sure that all the possible sequences are examined.

Janne Valkonen; Matti Koskimies; Kim Bjrkman; Keijo Heljanko; Ilkka Niemel; Jari J. Hmlinen

2009-01-01T23:59:59.000Z

414

Automation of the LANL ARIES lathe glovebox  

SciTech Connect

This paper presents the design of an automation system required for material handling within a glovebox. The Advanced Recovery and Integration Extraction System (ARIES) located at the Los Alamos National Laboratory (LANL) enables workers to dismantle nuclear weapons, separating the plutonium from other weapon components. The ARIES line consists of several gloveboxes that allow the 'pit' or trigger of a nuclear weapon to be dismantled and the plutonium stored in a safe form. The Lathe glovebox is the first step in the ARIES line and is used to cut the pit open to be dismantled. There are several methods for doing this, however there are advantages to using the lathe over other methods for this process. In general, this system will give the ARIES line the capability to handle a wider range of pit types. The system consists of a lathe, a 4 Degree of Freedom (DOF) robot, a glovebox that houses them, and a universal controller that resides outside the glovebox and controls all equipment. This paper will present the design and possible implementation of this lathe automation system. It will cover the system requirements, the mechanical hardware used within the glovebox, the control system and software, and operation procedures for various tasks.

Pittman, P. C. (Pete C.); Staab, T. A. (Torsten); Nelson, D. C. (David C.); Santistevan, W. W. (William W.); Brown, W. G. (Wendel G.)

2001-01-01T23:59:59.000Z

415

UV LED lighting for automated crystal centring  

E-Print Network (OSTI)

A direct outcome of the exponential growth of macromolecular crystallography is the continuously increasing demand for synchrotron beam time, both from academic and industrial users. As more and more projects entail screening a profusion of sample crystals, fully automated procedures at every level of the experiments are being implemented at all synchrotron facilities. One of the major obstacles to achieving such automation lies in the sample recognition and centring in the X-ray beam. The capacity of UV light to specifically react with aromatic residues present in proteins or with DNA base pairs is at the basis of UV-assisted crystal centring. Although very efficient, a well known side effect of illuminating biological samples with strong UV sources is the damage induced on the irradiated samples. In the present study the effectiveness of a softer UV light for crystal centring by taking advantage of low-power light-emitting diode (LED) sources has been investigated. The use of UV LEDs represents a lowcost solution for crystal centring with high specificity.

Leonard M. G. Chavas; Yusuke Yamada; Masahiko Hiraki; Noriyuki Igarashi; Naohiro Matsugaki; Soichi Wakatsuki

2010-01-01T23:59:59.000Z

416

Application Guide for the Automation of Distribution Feeder Capacitors  

Science Conference Proceedings (OSTI)

This fourth and final report in EPRI's capacitor reliability study deals with automating distribution capacitors. Prior reports dealt with nuisance fuse operations, operating and construction practices, and lighting protection and grounding of capacitor controllers. This guide is concerned with applying automated switched capacitors to distribution systems. Consideration is given to applications involving locally controlled capacitor banks and to systems utilizing centrally controlled, switched capacitor...

2005-12-13T23:59:59.000Z

417

Automated Phase Design and Timing Adjustment for Signal Phase Design  

Science Conference Proceedings (OSTI)

In this paper we describe the design processes of human traffic engineers and the development of an automated system that solves the problem of timing adjustment in signal phase sequence design. i>Signal phase sequencing refers to the sequence of ... Keywords: automated design, case-based reasoning, signal phase design, traffic management

L. Wang; C. C. Hayes; R. R. Penner

2001-06-01T23:59:59.000Z

418

Weight control in an automated design environment. [Of aircraft  

SciTech Connect

Results of a program to study weight control in an automated design environment are presented. Automation, computer applications, design coverage and special communication problems are discussed. Results of a tube weight analysis routine, a program of weight control incentives, and results of a special weight reduction program are given.

Staton, R.N.

1987-01-01T23:59:59.000Z

419

Exploring user's perception toward automated checkout trolley in developing countries  

Science Conference Proceedings (OSTI)

Retailers nowadays have relied on technology-based self-service options such as the self-checkout system to provide better customer value through pleasant shopping experience. Recently, automated checkout shopping trolley technologies have taken a further ... Keywords: automated checkout, technology management, technology-based self-service (TBSS)

Koh Peik See; Tan Shiang-Yen; Nasuha Lee Abdullah; Rosnah Idrus

2011-04-01T23:59:59.000Z

420

An automated translator for model checking time constrained workflow systems  

Science Conference Proceedings (OSTI)

Workflows have proven to be a useful conceptualization for the automation of business processes. While formal verification methods (e.g., model checking) can help ensure the reliability of workflow systems, the industrial uptake of such methods has been ... Keywords: automated translation, distributed model checking, modeling, time, workflow systems

Ahmed Shah Mashiyat; Fazle Rabbi; Hao Wang; Wendy MacCaull

2010-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Automated gas transfer systems for low pressure operations  

Science Conference Proceedings (OSTI)

The introduction of new components and the modification of commercially available hardware have been instrumental in the automation of low pressure gas transfer systems. The benefits from the automation have been faster sample operation, increased precision and a safer environment for the operator.

Baker, R.W.; Hoseus, N.L.

1988-01-22T23:59:59.000Z

422

Prototypes for automated architectural 3D-layout  

Science Conference Proceedings (OSTI)

Prototypes for automated spatial layout in architecture focus on approaches, which define occupiable space as an orthogonal 2D-grid and use algorithms to allocate each rectangle of the grid to a particular function. However, these approaches are limiting ... Keywords: 3D-modeling and automated spatial layout, euclidean and non-euclidean geometries, satisfiability

Henriette Bier; Adriaan De Jong; Niels Brouwers; Marijn Heule; Hans Van Maaren / Gijs Van Der Hoorn

2007-09-01T23:59:59.000Z

423

Automated economic data processing in the changing business world  

Science Conference Proceedings (OSTI)

An attempt is made for exploring some strands of the automated economic data processing in the changing business world. The new realities in business management and automated economic data processing are outlined. Some strands for intellectual support ... Keywords: E-business, M-business, business intelligence, data processing, information technology, knowledge management

Ljuben Kraev

2003-06-01T23:59:59.000Z

424

Efficient and effective automated surveillance agents using kernel tricks  

Science Conference Proceedings (OSTI)

Many schemes have been presented over the years to develop automated visual surveillance systems. However, these schemes typically need custom equipment, or involve significant complexity and storage requirements. In this paper we present three software-based ... Keywords: agent, automated, camera, intrusion, kernel, surveillance

Tarem Ahmed, Xianglin Wei, Supriyo Ahmed, Al-Sakib Khan Pathan

2013-05-01T23:59:59.000Z

425

Traffic measurement and analysis of building automation and control networks  

Science Conference Proceedings (OSTI)

This paper proposes a framework for a flow-based network traffic monitoring of building automation and control networks. Current approaches to monitor special environment networks are limited to checking accessibility and a state of monitored devices. ... Keywords: BACnet, BACnetflow, analysis, automation, building, control, measurement, network

Radek Krej?; Pavel ?eleda; Jakub Dobrovoln

2012-06-01T23:59:59.000Z

426

Towards automated design of MAC protocols for underwater wireless networks  

Science Conference Proceedings (OSTI)

We present a framework for the automated design of MAC protocols for underwater acoustic wireless networks. We formulate a protocol optimization problem in which the exchange of control packets is explicitly modeled. A protocol optimization program generates ... Keywords: automation, mac, network, wireless underwater protocol

Volkan Rodoplu; Amir Aminzadeh Gohari; Wei Tang

2008-09-01T23:59:59.000Z

427

The CADE-23 Automated Theorem Proving System Competition - CASC-23  

Science Conference Proceedings (OSTI)

The CADE ATP System Competition (CASC) is an annual evaluation of fully automatic, classical logic Automated Theorem Proving (ATP) systems. CASC-23 was the sixteenth competition in the CASC series. Thirty-six ATP systems and system variants competed ... Keywords: Automated theorem proving, competition

Geoff Sutcliffe

2012-01-01T23:59:59.000Z

428

An application of automated reasoning in natural language question answering  

Science Conference Proceedings (OSTI)

The LogAnswer system is an application of automated reasoning to the field of open domain question answering. In order to find answers to natural language questions regarding arbitrary topics, the system integrates an automated theorem prover in a framework ... Keywords: Question answering, theorem prover

Ulrich Furbach; Ingo Glckner; Bjrn Pelzer

2010-04-01T23:59:59.000Z

429

The CADE-21 automated theorem proving system competition  

Science Conference Proceedings (OSTI)

The CADE ATP system competition (CASC) is an annual evaluation of fully automatic, first order Automated Theorem Proving (ATP) systems. CASC-21 was the twelfth competition in the CASC series. Twenty ATP systems and system variants competed in the various ... Keywords: Competition, automated theorem proving

Geoff Sutcliffe

2008-01-01T23:59:59.000Z

430

Design automation of cellular neural networks for data fusion applications  

Science Conference Proceedings (OSTI)

In this study, a novel methodology for the design automation of cellular neural networks (CNNs) for different applications is proposed. In particular, an evolvable algorithm has been developed providing the ability to generate the netlist of the requested ... Keywords: Cellular neural networks, Data fusion, Design automation, Sensor network

Prodromos Chatziagorakis; Georgios Ch. Sirakoulis; John N. Lygouras

2012-02-01T23:59:59.000Z

431

Automated Configuration of Algorithms for Solving Hard Computational Problems  

E-Print Network (OSTI)

Automated Configuration of Algorithms for Solving Hard Computational Problems by Frank Hutter Dipl-performing algorithms for many hard problems are highly parameterized. Selecting the best heuristics and tuning studies the automation of this important part of algorithm design: the configuration of discrete algorithm

Hutter, Frank

432

Opportunities for Energy Efficiency and Automated Demand Response in Industrial Refrigerated Warehouses in California  

E-Print Network (OSTI)

your Power. (2008). "Demand Response Programs." RetrievedS. (2008). Automated Demand Response Results from Multi-Yearusing Open Automated Demand Response, California Energy

Lekov, Alex

2009-01-01T23:59:59.000Z

433

Design and Operation of an Open, Interoperable Automated Demand Response Infrastructure for Commercial Buildings  

E-Print Network (OSTI)

below. Fig. 4 Automated demand response general features Thearchitecture Automated Demand Response System ArchitectureCould Bene?t for Demand Response Programs, But Challenges

Piette, Mary Ann

2010-01-01T23:59:59.000Z

434

Demand Response and Open Automated Demand Response Opportunities for Data Centers  

E-Print Network (OSTI)

Standardized Automated Demand Response Signals. Presented atand Automated Demand Response in Industrial RefrigeratedActions for Industrial Demand Response in California. LBNL-

Mares, K.C.

2010-01-01T23:59:59.000Z

435

Findings from Seven Years of Field Performance Data for Automated Demand Response in Commercial Buildings  

E-Print Network (OSTI)

Open Automated Demand Response Demonstration Project LBNL-2009a). Open Automated Demand Response Communications inand Actions for Industrial Demand Response in California.

Kiliccote, Sila

2010-01-01T23:59:59.000Z

436

Design and Implementation of an Open, Interoperable Automated Demand Response Infrastructure  

E-Print Network (OSTI)

of Fully Automated Demand Response in Large Facilities. CEC-Fully Automated Demand Response Tests in Large Facilities.Management and Demand Response in Commercial Building. ,

Piette, Mary Ann; Kiliccote, Sila; Ghatikar, Girish

2008-01-01T23:59:59.000Z

437

ISA Approves Standard for Wireless Automation in Process Control  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ISA Approves Standard for Wireless Automation in Process Control ISA Approves Standard for Wireless Automation in Process Control Applications ISA Approves Standard for Wireless Automation in Process Control Applications September 22, 2009 - 1:28pm Addthis September 22, 2009 On September 9, the Standards and Practices Board of the International Society for Automation (ISA) approved the ISA-100.11a wireless standard, "Wireless Systems for Industrial Automation: Process Control and Related Applications," making it an official ISA standard. The standard is intended to provide secure, reliable wireless operation for monitoring, alerting, and control applications. It enables robustness with non-ISA-compliant legacy wireless systems, coexistence and interoperability with other wireless devices, and robustness in harsh industrial

438

Reference Model for Control and Automation Systems in Electrical Power |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Model for Control and Automation Systems in Electrical Model for Control and Automation Systems in Electrical Power Reference Model for Control and Automation Systems in Electrical Power Modern infrastructure automation systems are threatened by cyber attack. Their higher visibility in recent years and the increasing use of modern information technology (IT) components contribute to increased security risk. A means of analyzing these infrastructure automation systems is needed to help understand and study the many system relationships that affect the overall security of the system. Modeling these systems is a very cost effective means of addressing the problem of security from an overall system view. The model presented in the document below provides a structured, cost effective approach to address technical security in process control systems

439

Building Technologies Office: Small- and Medium-Sized Building Automation  

NLE Websites -- All DOE Office Websites (Extended Search)

Small- and Medium-Sized Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project to someone by E-mail Share Building Technologies Office: Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project on Facebook Tweet about Building Technologies Office: Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project on Twitter Bookmark Building Technologies Office: Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project on Google Bookmark Building Technologies Office: Small- and Medium-Sized Building Automation and Control System Needs: Scoping Study Research Project on Delicious Rank Building Technologies Office: Small- and Medium-Sized Building

440

A sensor-based automation system for handling nuclear materials  

Science Conference Proceedings (OSTI)

An automated system is being developed for handling large payloads of radioactive nuclear materials in an analytical laboratory. The automation system performs unpacking and repacking of payloads from shipping and storage containers, and delivery of the payloads to the stations in the laboratory. The system uses machine vision and force/torque sensing to provide sensor-based control of the automation system in order to enhance system safety, flexibility, and robustness, and achieve easy remote operation. The automation system also controls the operation of the laboratory measurement systems and the coordination of them with the robotic system. Particular attention has been given to system design features and analytical methods that provide an enhanced level of operational safety. Independent mechanical gripper interlock and tool release mechanisms were designed to prevent payload mishandling. An extensive Failure Modes and Effects Analysis of the automation system was developed as a safety design analysis tool.

Drotning, W.; Kimberly, H.; Wapman, W.; Darras, D. [and others

1997-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Workforce Retention Accomplishments Presentation - Sustainability Assessment of Workforce Well-Being and Mission Readiness  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sustainability Assessment of Workforce Sustainability Assessment of Workforce Well-Being and Mission Readiness Jodi M. Jacobson, Ph.D., University of Maryland 2 Illness and Injury Lost Work Time Generational Divide Recruitment & Retention Competition Retirement & Aging Workforce Health & Well-Being Stress Depression & Anxiety Budget Cuts Technology Talent Management Work/Life Balance Safety Accountability Security Leadership Development Workforce Sustainability Chronic Health Conditions Globalization Critical Skills Shortage Job Skill Re-Alignment Job Transitioning Healthcare Costs YOU ARE NOT ALONE! 3 Indirect Costs  "You can"t manage what you can"t measure" (Dr. Ron Goetzel, Director, Institute for Health & Productivity Studies, Cornell University)

442

Sandia National Laboratories: A product of postwar readiness, 1945-1950  

Science Conference Proceedings (OSTI)

The genesis and growth of Sandia National Laboratories, the nation's largest nuclear weapons lab, stands as a pertinent case study showing the oftentimes complex, but effective interaction of government, industry, and the growth of cooperative research. Originally a part of Los Alamos Scientific Laboratory under management by the University of California, Sandia traces its roots to Z Division, an ordnance-engineering arm located at Sandia Base on the desert outskirts of Albuquerque, New Mexico, in September 1945. For Sandia National Laboratories, the early postwar years/emdash/rather than representing a transformation to peacetime/emdash/were characterized by a continued mobilization of engineering and science in the name of national readiness.

Furman, N.S.

1988-04-01T23:59:59.000Z

443

Manz Automation AG | Open Energy Information  

Open Energy Info (EERE)

AG AG Jump to: navigation, search Name Manz Automation AG Place Reutlingen, Baden-Württemberg, Germany Zip D-72768 Sector Solar Product German manufacturer of solar and LCD capital equipment. Coordinates 48.49159°, 9.21487° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.49159,"lon":9.21487,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

444

An automated neutron monitor maintenance system  

Science Conference Proceedings (OSTI)

Neutron detectors are commonly used by the nuclear materials processing industry to monitor fissile materials in process vessels and tanks. The proper functioning of these neutron monitors must be periodically evaluated. We have developed and placed in routine use a PC-based multichannel analyzer (MCA) system for on-line BF3 and He-3 gas-filled detector function testing. The automated system: 1) acquires spectral data from the monitor system, 2) analyzes the spectrum to determine the detector`s functionality, 3) makes suggestions for maintenance or repair, as required, and 4) saves the spectrum and results to disk for review. The operator interface has been designed to be user-friendly and to minimize the training requirements of the user. The system may also be easily customized for various applications

Moore, F.S.; Griffin, J.C.; Odell, D.M.C.

1996-09-01T23:59:59.000Z

445

Automated startup of the MIT research reactor  

SciTech Connect

This summary describes the development, implementation, and testing of a generic method for performing automated startups of nuclear reactors described by space-independent kinetics under conditions of closed-loop digital control. The technique entails first obtaining a reliable estimate of the reactor's initial degree of subcriticality and then substituting that estimate into a model-based control law so as to permit a power increase from subcritical on a demanded trajectory. The estimation of subcriticality is accomplished by application of the perturbed reactivity method. The shutdown reactor is perturbed by the insertion of reactivity at a known rate. Observation of the resulting period permits determination of the initial degree of subcriticality. A major advantage to this method is that repeated estimates are obtained of the same quantity. Hence, statistical methods can be applied to improve the quality of the calculation.

Kwok, K.S. (Massachusetts Inst. of Tech., Cambridge (United States))

1992-01-01T23:59:59.000Z

446

Automated Spot Weld Inspection using Infrared Thermography  

Science Conference Proceedings (OSTI)

An automated non-contact and non-destructive resistance spot weld inspection system based on infrared (IR) thermography was developed for post-weld applications. During inspection, a weld coupon was heated up by an auxiliary induction heating device from one side of the weld, while the resulting thermal waves on the other side were observed by an IR camera. The IR images were analyzed to extract a thermal signature based on normalized heating time, which was then quantitatively correlated to the spot weld nugget size. The use of normalized instead of absolute IR intensity was found to be useful in minimizing the sensitivity to the unknown surface conditions and environment interference. Application of the IR-based inspection system to different advanced high strength steels, thickness gauges and coatings were discussed.

Chen, Jian [ORNL; Zhang, Wei [ORNL; Yu, Zhenzhen [ORNL; Feng, Zhili [ORNL

2012-01-01T23:59:59.000Z

447

Automated User Modeling for Personalized Digital Libraries  

E-Print Network (OSTI)

Digital libraries (DL) have become one of the most typical ways of accessing any kind of digitalized information. Due to this key role, users welcome any improvements on the services they receive from digital libraries. One trend used to improve digital services is through personalization. Up to now, the most common approach for personalization in digital libraries has been user-driven. Nevertheless, the design of efficient personalized services has to be done, at least in part, in an automatic way. In this context, machine learning techniques automate the process of constructing user models. This paper proposes a new approach to construct digital libraries that satisfy users necessity for information: Adaptive Digital Libraries, libraries that automatically learn user preferences and goals and personalize their interaction using this information.

E. Frias-martinez; G. Magoulas; S. Chen; R. Macredie

2006-01-01T23:59:59.000Z

448

Honeywell modular automation system computer software documentation  

SciTech Connect

The purpose of this Computer Software Document (CSWD) is to provide configuration control of the Honeywell Modular Automation System (MAS) in use at the Plutonium Finishing Plant (PFP). The Honeywell MAS is used to control the thermal stabilization furnaces in glovebox HA-211. The PFP developed software is being updated to reflect the Polycube Processing and Unwashed Salt Thermal Stabilization program addition. The polycube processing program was installed per HNF-FMP-02-11162-R2. The functional test of the program was performed in JCS work package 22-02-1031, The unwashed salt item program was installed per HNF-FMP-03-16577-RO. The functional test of the program completed in JCS work package 22-03-00654.

STUBBS, A.M.

2003-07-02T23:59:59.000Z

449

Automated Fuel Element Closure Welding System  

SciTech Connect

The Automated Fuel Element Closure Welding System is a robotic device that will load and weld top end plugs onto nuclear fuel elements in a highly radioactive and inert gas environment. The system was developed at Argonne National Laboratory-West as part of the Fuel Cycle Demonstration. The welding system performs four main functions, it (1) injects a small amount of a xenon/krypton gas mixture into specific fuel elements, and (2) loads tiny end plugs into the tops of fuel element jackets, and (3) welds the end plugs to the element jackets, and (4) performs a dimensional inspection of the pre- and post-welded fuel elements. The system components are modular to facilitate remote replacement of failed parts. The entire system can be operated remotely in manual, semi-automatic, or fully automatic modes using a computer control system. The welding system is currently undergoing software testing and functional checkout.

Wahlquist, D.R.

1993-01-01T23:59:59.000Z

450

Automated Fuel Element Closure Welding System  

SciTech Connect

The Automated Fuel Element Closure Welding System is a robotic device that will load and weld top end plugs onto nuclear fuel elements in a highly radioactive and inert gas environment. The system was developed at Argonne National Laboratory-West as part of the Fuel Cycle Demonstration. The welding system performs four main functions, it (1) injects a small amount of a xenon/krypton gas mixture into specific fuel elements, and (2) loads tiny end plugs into the tops of fuel element jackets, and (3) welds the end plugs to the element jackets, and (4) performs a dimensional inspection of the pre- and post-welded fuel elements. The system components are modular to facilitate remote replacement of failed parts. The entire system can be operated remotely in manual, semi-automatic, or fully automatic modes using a computer control system. The welding system is currently undergoing software testing and functional checkout.

Wahlquist, D.R.

1993-03-01T23:59:59.000Z

451

Design and Operation of an Open, Interoperable Automated Demand Response  

NLE Websites -- All DOE Office Websites (Extended Search)

Design and Operation of an Open, Interoperable Automated Demand Response Design and Operation of an Open, Interoperable Automated Demand Response Infrastructure for Commercial Buildings Title Design and Operation of an Open, Interoperable Automated Demand Response Infrastructure for Commercial Buildings Publication Type Journal Article LBNL Report Number LBNL-2340e Year of Publication 2009 Authors Piette, Mary Ann, Girish Ghatikar, Sila Kiliccote, David S. Watson, Edward Koch, and Dan Hennage Journal Journal of Computing Science and Information Engineering Volume 9 Issue 2 Keywords communication and standards, market sectors, openadr Abstract This paper describes the concept for and lessons from the development and field-testing of an open, interoperable communications infrastructure to support automated demand response (auto-DR). Automating DR allows greater levels of participation, improved reliability, and repeatability of the DR in participating facilities. This paper also presents the technical and architectural issues associated with auto-DR and description of the demand response automation server (DRAS), the client/server architecture-based middle-ware used to automate the interactions between the utilities or any DR serving entity and their customers for DR programs. Use case diagrams are presented to show the role of the DRAS between utility/ISO and the clients at the facilities.

452

Operational readiness review implementation plan for K Basin sludge water system  

SciTech Connect

This Implementation Plan (IP) has been prepared consistent with the requirements of U.S. Department of Energy (DOE) Order 425.1B, ''Startup and Restart of Nuclear Facilities'', and DOE-STD-3006-2000, ''Planning and Conduct of Operational Readiness Reviews'' (ORR) (DOE 2002). The scope of the DOE ORR is described in the RL ''Plan of Action, K Basin Sludge Water System'' (Veitenheimer 2003), prepared by DOE project line management and approved by the RL Manager, the designated Approval Authority, on March 20, 2003. The scope of the contractor ORR is described in the contractor ''Plan of Action for the K Basins Sludge Water System Operational Readiness Review'' (FH 2002a) which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on December 19, 2002. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated February 5, 2003 (Roberson 2003). This IP provides the overall approach and guidelines for performance of the DOE ORR. Appendix A contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4.

IRWIN, R.M.

2003-05-01T23:59:59.000Z

453

Microsoft Word - Wireless Automation World for OE FINAL.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Automation World Features New White Paper on Wireless Security, Interviews Authors Automation World Features New White Paper on Wireless Security, Interviews Authors April 16, 2009 The April 2009 issue of Automation World magazine features the white paper Wireless Systems Considerations When Implementing NERC Critical Infrastructure Protection Standards. The paper addresses wireless protection issues arising from requirements of the Critical Infrastructure Protection (CIP) Standards for the electricity sector, developed by the North American Electric Reliability Corporation (NERC). The CIP standards require entities to monitor and control all electronic access to a company's electronic security perimeter, but this requirement becomes difficult to implement when it

454

Distribution automation. (Latest citations from the INSPEC database). Published Search  

SciTech Connect

The bibliography contains citations concerning distribution automation for the electric power utility industry. Distribution automation comprises a combination of real-time load monitoring; detailed modeling of the distribution, generation, transmission, and customer systems; and remote control of devices. Distribution automation achieves energy conservation by reduction of consumption, lower losses in distribution and transmission mission circuits, and reduction of peak load. Topics covered include demand-side management, telecontrol, distribution networks, communications software, and cost-benefit analyses. (Contains a minimum of 93 citations and includes a subject term index and title list.)

Not Available

1994-12-01T23:59:59.000Z

455

DOE-HDBK-3012-2003; DOE Handbook Guide to Good Practices for Operational Readiness Reviews (ORR) Team Leader's Guide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NOT MEASUREMENT NOT MEASUREMENT SENSITIVE DOE-HDBK-3012-2003 SUPERSEDING DOE-HDBK-3012-96 DOE HANDBOOK GUIDE TO GOOD PRACTICES FOR OPERATIONAL READINESS REVIEWS (ORR) TEAM LEADER'S GUIDE U.S. Department of Energy AREA MISC Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE-HDBK-3012-2003 FOREWORD This Department of Energy handbook, Guide to Good Practices for Conducting Operational Readiness Reviews (ORR) Team Leader's Handbook, is approved for use by all DOE Components and their contractors. The guidance in this document is the distillation of the experience and lessons learned during numerous operational readiness reviews contributed by team leaders with a wide range of backgrounds. There are

456

To Wave Or Not To Wave? Order Release Policies for Warehouses with an Automated Sorter  

E-Print Network (OSTI)

Wave-based release policies are prevalent in warehouses with an automated sorter, and take different

Gallien, Jrmie

2008-09-08T23:59:59.000Z

457

Report of independent consultants reviewing Integrated Test Stands (ITS) performance and readiness of DARHT for construction start  

SciTech Connect

Independent consultants met at Los Alamos, June 15 and 16, 1993, to review progress on the commissioning of the Integrated Test Stand (ITS) for DARHT and to provide DOE with technical input on readiness for construction of the first radiographic arm of DARHT. The consultants concluded that all milestones necessary for demonstrating the performance of the DARHT accelerator have been met and that the project is ready for construction to resume. The experimental program using ITS should be continued to quantify the comparison of experiment and theory, to test improvements on the injector insulator, and to better evaluate the interaction of the beam and the target.

Not Available

1993-08-01T23:59:59.000Z

458

Use of Residual Solids from Pulp and Paper Mills for Enhancing Strength and Durability of Ready-Mixed Concrete  

SciTech Connect

This research was conducted to establish mixture proportioning and production technologies for ready-mixed concrete containing pulp and paper mill residual solids and to study technical, economical, and performance benefits of using the residual solids in the concrete. Fibrous residuals generated from pulp and paper mills were used, and concrete mixture proportions and productions technologies were first optimized under controlled laboratory conditions. Based on the mixture proportions established in the laboratory, prototype field concrete mixtures were manufactured at a ready-mixed concrete plant. Afterward, a field construction demonstration was held to demonstrate the production and placement of structural-grade cold-weather-resistant concrete containing residual solids.

Tarun R. Naik; Yoon-moon Chun; Rudolph N. Kraus

2003-09-18T23:59:59.000Z

459

Industrial SPP/Partner Teaming Profile - Rockwell Automation  

NLE Websites -- All DOE Office Websites (Extended Search)

Rockwell Automation Rockwell Automation 6400 West Enterprise Drive Mequon, WI 53092 Business: Control Products & Solutions Joshua J. Olive Sr. Product Specialist Phone: 262-512-2095 Email: jjolive@ra.rockwell.com Industrial Partner General Mills 9000 Plymouth Ave. North Minneapolis, MN 55427 Business: Food Processing David Spryshak Facilities, Control, & IS Engineer Phone: 763-764-7091 Email: Dave.spryshak@genmills.com Rockwell Automation helps General Mills save $2.6 million annually through a standardized energy management system for air handling units Project Scope Rockwell Automation partnered with General Mills to develop a standardized energy management system (EMS) for controlling air handling units (AHU) and has installed the system at 14 General Mills

460

Definition: Automated Feeder And Line Switching | Open Energy Information  

Open Energy Info (EERE)

Definition Definition Edit with form History Facebook icon Twitter icon » Definition: Automated Feeder And Line Switching Jump to: navigation, search Dictionary.png Automated Feeder And Line Switching Automated feeder and line switching is realized through automatic isolation and reconfiguration of faulted segments of distribution feeders or transmission lines via sensors, controls, switches, and communications systems. These devices can operate autonomously in response to local events or in response to signals from a central control system.[1] Related Terms transmission lines, transmission line References ↑ SmartGrid.gov 'Description of Functions' An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Automated_Feeder_And_Line_Switching&oldid=480562"

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Price Server System for Automated Critical Peak Pricing  

NLE Websites -- All DOE Office Websites (Extended Search)

Price Server System for Automated Critical Peak Pricing Price Server System for Automated Critical Peak Pricing Speaker(s): David S. Watson Date: June 3, 2005 - 12:00pm Location: 90-3148 Overview of current California Energy Commission (CEC)/Demand Response Research Center (DRRC) Auto-CPP project: This summer, some select commercial CPP customers of PG&E will have the option of joining the Automated Critical Peak Pricing pilot. The pilot will have the same tariffs as standard CPP programs, but will include an added feature: automated shedding of electric loads. Through use of the Price Server System, day-ahead CPP event signals initiated by PG&E will ultimately cause electric loads to be automatically curtailed on commercial customer sites. These optional predetermined shed strategies will occur without

462

V-205: IBM Tivoli System Automation for Multiplatforms Java Multiple  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

V-205: IBM Tivoli System Automation for Multiplatforms Java V-205: IBM Tivoli System Automation for Multiplatforms Java Multiple Vulnerabilities V-205: IBM Tivoli System Automation for Multiplatforms Java Multiple Vulnerabilities July 29, 2013 - 4:20am Addthis PROBLEM: IBM has acknowledged a weakness and multiple vulnerabilities in IBM Tivoli System Automation for Multiplatforms, which can be exploited by malicious, local users to disclose certain sensitive information and gain escalated privileges and by malicious people to disclose certain sensitive information, manipulate certain data, bypass certain security restrictions, cause a DoS (Denial of Service), and compromise a vulnerable system. PLATFORM: The weakness and the vulnerabilities are reported in versions 3.1 through 3.2.2 running on AIX, Linux, Solaris, and Windows.

463

ISA Approves Standard for Wireless Automation in Process Control Applications  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ISA Approves Standard for Wireless Automation in Process Control Applications ISA Approves Standard for Wireless Automation in Process Control Applications September 22, 2009 On September 9, the Standards and Practices Board of the International Society for Automation (ISA) approved the ISA-100.11a wireless standard, "Wireless Systems for Industrial Automation: Process Control and Related Applications," making it an official ISA standard. The standard is intended to provide secure, reliable wireless operation for monitoring, alerting, and control applications. It enables robustness with non-ISA-compliant legacy wireless systems, coexistence and interoperability with other wireless devices, and robustness in harsh industrial environments. To meet the needs of industrial wireless users and operators of low-energy fixed, portable, and moving

464

Java Automation Controller and Real-Time Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Java Automation Controller and Real-Time Systems Java Automation Controller and Real-Time Systems Speaker(s): Greg Bollella Date: June 29, 2009 - 12:00pm Location: 90-3122 Java has always been a disruptive technology and now it is breaking the mold in industrial, process, building, and transportation automation systems. For many years, programmable logic controllers (PLCs), the digital versions of old relay-based control systems (such as that used in the NYC Subway system in the late 1800s) have primarily controlled these systems. PLCs are the workhorses of the controls industry but the market is characterized by proprietary, closed, expensive, special-purpose solutions. A Java-based automation controller breaks the mold by allowing control algorithms, which require strict real-time capabilities, to run on

465

Radioanalytical Chemistry for Automated Nuclear Waste Process Monitoring  

Science Conference Proceedings (OSTI)

The objectives of our research were to develop the first automated radiochemical process analyzer including sample pretreatment methodoology, and to initiate work on new detection approaches, especially using modified diode detectors.

Jay W. Grate; Timothy A. DeVol

2006-07-20T23:59:59.000Z

466

Development of an Automated Classification Procedure for Rainfall Systems  

Science Conference Proceedings (OSTI)

An automated procedure for classifying rainfall systems (meso-? scale and larger) was developed using an operational analysis of hourly precipitation estimates from radar and rain gauge data. The development process followed two main phases: a ...

Michael E. Baldwin; John S. Kain; S. Lakshmivarahan

2005-04-01T23:59:59.000Z

467

Decisions in the perspective automated artillery fire support  

Science Conference Proceedings (OSTI)

This paper is focused on decisions in the future Automated Artillery Fire Support Control System. Artillery units of the Army of the Czech Republic, reflecting current global security neighborhood, can be used outside the Czech Republic. The paper presents ...

M. Blaha; L. Potuk

2011-10-01T23:59:59.000Z

468

Operational Automated Graphics at the National Climatic Data Center  

Science Conference Proceedings (OSTI)

In January 1987 the National Climatic Data Center introduced automated graphics into its Climatological Data publications. The publications, which are produced for each state and distributed to thousands of subscribers monthly, have, in the past, ...

Michael Crowe; Thomas Reek; Robert Mattingly

1988-01-01T23:59:59.000Z

469

Summary of the 2006 Automated Demand Response Pilot  

E-Print Network (OSTI)

This paper discusses the specific concept for, design of, and results from a pilot program to automate demand response with critical peak pricing. California utilities have been exploring the use of critical peak pricing (CPP) to help reduce peak day summer time electric loads. CPP is a form of price-responsive demand response. This Automated Critical Peak Pricing (Auto-CPP) project from 2006 draws upon three years of previous research and demonstrations from the years of 2003, 2004, and 2005. The purpose of automated demand response (DR) is to improve the responsiveness and participation of electricity customers in DR programs and lower overall costs to achieve DR. Auto-CPP is a form of automated demand response (Auto-DR).

Piette, M.; Kiliccote, S.

2007-01-01T23:59:59.000Z

470

Automated electricity demand response - Tech Close-Up  

NLE Websites -- All DOE Office Websites (Extended Search)

Automated electricity demand response - Tech Close-Up Click here to view this video Date: August 27, 2013 Presenter(s): Many, including EETD's Mary Ann Piette. A Tech Close-Up news...

471

Automated Video Analysis of Animal Movements Using Gabor Orientation Filters  

E-Print Network (OSTI)

a Single frame from a video clip, after de-interlacing.median of all frames in the video sequence. c The output of010-9062-1 Automated Video Analysis of Animal Movements

Wagenaar, Daniel A.; Kristan, Wiliam B.

2010-01-01T23:59:59.000Z

472

Human-automation collaborative RRT for UAV mission path planning  

E-Print Network (OSTI)

Future envisioned Unmanned Aerial Vehicle (UAV) missions will be carried out in dynamic and complex environments. Human-automation collaboration will be required in order to distribute the increased mission workload that ...

Caves, Amrico De Jess (Caves Corral)

2010-01-01T23:59:59.000Z

473

Wireless home automation networks: a survey of architectures and technologies  

Science Conference Proceedings (OSTI)

Wireless home automation networks comprise wireless embedded sensors and actuators that enable monitoring and control applications for home user comfort and efficient home management. This article surveys the main current and emerging solutions that ...

Carles Gomez; Josep Paradells

2010-06-01T23:59:59.000Z

474

Monitoring Free-Water Evaporation at Automated Weather Stations  

Science Conference Proceedings (OSTI)

The automation of weather stations necessitates an alternative approach to the traditional manual measure of free-water evaporation made using a class A pan. This study compared commercially available water-level sensing transducers mounted on ...

S. M. McGinn; H. D. J. McLean

1995-12-01T23:59:59.000Z

475

Comprehensive Automated Quality Assurance of Daily Surface Observations  

Science Conference Proceedings (OSTI)

This paper describes a comprehensive set of fully automated quality assurance (QA) procedures for observations of daily surface temperature, precipitation, snowfall, and snow depth. The QA procedures are being applied operationally to the Global ...

Imke Durre; Matthew J. Menne; Byron E. Gleason; Tamara G. Houston; Russell S. Vose

2010-08-01T23:59:59.000Z

476

A simulation tool for automated platooning in mixed highway scenarios  

Science Conference Proceedings (OSTI)

Automated platooning is one of the most challenging fields in the domain of Intelligent Transportation Systems (ITS). Conceptually, platooning means creating clusters of vehicles which closely follow each other autonomously without action of the driver, ...

Michele Segata; Falko Dressler; Renato Lo Cigno; Mario Gerla

2013-02-01T23:59:59.000Z

477

An Automated Radar Technique for the Identification of Tropical Precipitation  

Science Conference Proceedings (OSTI)

A radar-based automated technique for the identification of tropical precipitation was developed to improve quantitative precipitation estimation during extreme rainfall events. The technique uses vertical profiles of reflectivity to identify the ...

Xiaoyong Xu; Kenneth Howard; Jian Zhang

2008-10-01T23:59:59.000Z

478

Exploiting home automation protocols for load monitoring in smart buildings  

Science Conference Proceedings (OSTI)

Monitoring and controlling electrical loads is crucial for demand-side energy management in smart grids. Home automation (HA) protocols, such as X10 and Insteon, have provided programmatic load control for many years, and are being widely deployed in ...

David Irwin; Sean Barker; Aditya Mishra; Prashant Shenoy; Anthony Wu; Jeannie Albrecht

2011-11-01T23:59:59.000Z

479

V-132: IBM Tivoli System Automation Application Manager Multiple...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3.1, 3.2, 3.2.1, and 3.2.2 ABSTRACT: Multiple security vulnerabilities exist in the IBM Java Runtime Environment component of IBM Tivoli System Automation Application Manager which...

480

Automated generation of kinetic chemical mechanisms using rewriting  

Science Conference Proceedings (OSTI)

Several software systems have been developed recently for the automated generation of combustion reactions kinetic mechanisms using different representations of species and reactions and different generation algorithms. In parallel, several software ...

Olivier Bournez; Guy-Marie Cme; Valrie Conraud; Hlne Kirchner; Liliana Ib?nescu

2003-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "readiness nstar automated" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Automated reaction mechanism generation : improving accuracy and broadening scope  

E-Print Network (OSTI)

Chemical kinetic modeling plays an important role in the study of reactive chemical systems. Thus, an automated means of constructing chemical kinetic models forms a useful tool in the engineering and science surrounding ...

Magoon, Gregory Russell

2012-01-01T23:59:59.000Z

482

State-of-the-art automated process simulation systems  

Science Conference Proceedings (OSTI)

The control and engineering tasks accomplished with the help of automated process simulation systems are described. The practical solution examples are cited. The UniSim Design system, providing modeling of all stages of production cycle, is described.

V. M. Dozortsev; E. Yu. Kreidlin

2010-09-01T23:59:59.000Z

483

Proceedings of the 45th annual Design Automation Conference  

Science Conference Proceedings (OSTI)

Welcome to the 45th Design Automation Conference and the City of Anaheim! DAC is the premier event for the electronic design community. It offers the industry's most prestigious technical conference in combination with the biggest exhibition. DAC is ...

Limor Fix

2008-06-01T23:59:59.000Z

484

Modelling and automated composition of user-centric services  

Science Conference Proceedings (OSTI)

User-centric services bring additional constraints to the problem of automated service composition. While in business-centric settings the services are orchestrated in order to accomplish a specific business task, user-centric service composition should ...

Raman Kazhamiakin; Massimo Paolucci; Marco Pistore; Heorhi Raik

2010-10-01T23:59:59.000Z

485

Toward Automated Interpretation of Satellite Imagery for Navy Shipboard Applications  

Science Conference Proceedings (OSTI)

The U.S. Navy has plans to develop an automated system to analyze satellite imagery aboard its ships at sea. Lack of time for training, in combination with frequent personnel rotations, precludes the building of extensive imagery interpretation ...

James E. Peak; Paul M. Tag

1992-07-01T23:59:59.000Z

486

Intelligent and collaborative embedded computing in automation engineering  

Science Conference Proceedings (OSTI)

This paper presents an overview of the the novel technologies that we are experiencing today in the automation industries. We present the opportunities and challenges of having tightly coupled collaborative networks of embedded systems for controlling ...

Mohammad Abdullah Al Faruque; Arquimedes Canedo

2012-03-01T23:59:59.000Z

487

Assessing the performance of human-automation collaborative planning systems  

E-Print Network (OSTI)

Planning and Resource Allocation (P/RA) Human Supervisory Control (HSC) systems utilize the capabilities of both human operators and automated planning algorithms to schedule tasks for complex systems. In these systems, ...

Ryan, Jason C. (Jason Christopher)

2011-01-01T23:59:59.000Z

488

Face occlusion detection for automated teller machine surveillance  

Science Conference Proceedings (OSTI)

Real time automatic alarm systems play an essential role in security management, as evidenced by the surveillance cameras installed in nearly all automated teller machines (ATMs). Whereas manual video surveillance requires constant staff monitoring, ...

Daw-Tung Lin; Ming-Ju Liu

2006-12-01T23:59:59.000Z

489

New Services for Building Maintenance Enabled by Building Automation  

NLE Websites -- All DOE Office Websites (Extended Search)

New Services for Building Maintenance Enabled by Building Automation New Services for Building Maintenance Enabled by Building Automation Systems Speaker(s): Heikki Ihasalo Date: May 17, 2007 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Peng Xu Today's building automation systems enable building systems integration and access to information from a variety of sources, e.g. fire alarm systems, access control, security systems, lighting and control systems. With the help of Internet technology and XML (Extensible Markup Language) building automation systems can also connect to other enterprise\ applications such as facility management software, maintenance management systems, ERP or financial systems. New applications are also emerging to manage energy consumption in buildings, for example demand response and fault detection

490

Global health response more accurate with automated influenza surveillance  

NLE Websites -- All DOE Office Websites (Extended Search)

Global health response more accurate with automated influenza Global health response more accurate with automated influenza surveillance Global health response more accurate with automated influenza surveillance Public health officials will be able to determine whether an outbreak of an infectious disease comes from a pandemic strain or one less virulent. January 31, 2011 Lance Green of LANL tests an earlier version of a modular laboratory like the ones that will be part of the High-Throughput Laboratory Network Lance Green of LANL tests an earlier version of a modular laboratory like the ones that will be part of the High-Throughput Laboratory Network-a series of compact, self-contained, automated systems for surveillance and screening of potential pandemic strains of influenza and other deadly infectious diseases.

491

Automated construction technologies : analyses and future development strategies  

E-Print Network (OSTI)

Substandard productivity and the lack of skilled workers in the construction industry have led major corporations all over the world aiming to produce various types of automated construction technologies. During the process, ...

Hoang, Han (Han Mai)

2005-01-01T23:59:59.000Z

492

Proceedings of the 42nd annual Design Automation Conference  

Science Conference Proceedings (OSTI)

Welcome to the 42nd Design Automation Conference and the city of Anaheim! More than ever, DAC is the place where researchers and developers, industry and academia, exhibitors and their customers come to learn about the latest breakthroughs, the latest ...

William H. Joyner, Jr.; Grant E. Martin; Andrew B. Kahng

2005-06-01T23:59:59.000Z

493

Technical and System Requirements for Advanced Distribution Automation  

Science Conference Proceedings (OSTI)

Traditional distribution systems were designed to perform one function: distribute electrical energy to end-users. Advanced Distribution Automation (ADA) is a concept for a fully controllable and flexible distribution system that will facilitate the exchange of both electrical energy and information between participants and system components. This report presents background information on distribution automation technologies and develops a roadmap to achieve the ADA systems required for future power deli...

2004-06-09T23:59:59.000Z

494

Automated Galaxy Morphology: A Fourier Approach  

E-Print Network (OSTI)

We use automated surface photometry and pattern classification techniques to morphologically classify galaxies. The two-dimensional light distribution of a galaxy is reconstructed using Fourier series fits to azimuthal profiles computed in concentric elliptical annuli centered on the galaxy. Both the phase and amplitude of each Fourier component have been studied as a function of radial bin number for a large collection of galaxy images using principal component analysis. We find that up to 90 percent of the variance in many of these Fourier profiles may be characterized in as few as 3 principal components and their use substantially reduces the dimensionality of the classification problem. We use supervised learning methods in the form of artificial neural networks to train galaxy classifiers that detect morphological bars at the 85-90 percent confidence level and can identify the Hubble type with a 1-sigma scatter of 1.5 steps on the 16-step stage axis of the revised Hubble system. Finally, we systematically characterize the adverse effects of decreasing resolution and S/N on the quality of morphological information predicted by these classifiers.

S. C. Odewahn; S. H. Cohen; R. A. Windhorst; N. S. Philip

2001-10-11T23:59:59.000Z

495

THE QUASIPERIODIC AUTOMATED TRANSIT SEARCH ALGORITHM  

Science Conference Proceedings (OSTI)

We present a new algorithm for detecting transiting extrasolar planets in time-series photometry. The Quasiperiodic Automated Transit Search (QATS) algorithm relaxes the usual assumption of strictly periodic transits by permitting a variable, but bounded, interval between successive transits. We show that this method is capable of detecting transiting planets with significant transit timing variations without any loss of significance-{sup s}mearing{sup -}as would be incurred with traditional algorithms; however, this is at the cost of a slightly increased stochastic background. The approximate times of transit are standard products of the QATS search. Despite the increased flexibility, we show that QATS has a run-time complexity that is comparable to traditional search codes and is comparably easy to implement. QATS is applicable to data having a nearly uninterrupted, uniform cadence and is therefore well suited to the modern class of space-based transit searches (e.g., Kepler, CoRoT). Applications of QATS include transiting planets in dynamically active multi-planet systems and transiting planets in stellar binary systems.

Carter, Joshua A. [Harvard-Smithsonian Center for Astrophysics, 60 Garden St., Cambridge, MA 02138 (United States); Agol, Eric [Department of Astronomy, Box 351580, University of Washington, Seattle, WA 98195 (United States)

2013-03-10T23:59:59.000Z

496

Automation Enhancement of Multilayer Laue Lenses  

SciTech Connect

X-ray optics fabrication at Brookhaven National Laboratory has been facilitated by a new, state of the art magnetron sputtering physical deposition system. With its nine magnetron sputtering cathodes and substrate carrier that moves on a linear rail via a UHV brushless linear servo motor, the system is capable of accurately depositing the many thousands of layers necessary for multilayer Laue lenses. I have engineered a versatile and automated control program from scratch for the base system and many subsystems. Its main features include a custom scripting language, a fully customizable graphical user interface, wireless and remote control, and a terminal-based interface. This control system has already been successfully used in the creation of many types of x-ray optics, including several thousand layer multilayer Laue lenses.Before reaching the point at which a deposition can be run, stencil-like masks for the sputtering cathodes must be created to ensure the proper distribution of sputtered atoms. Quality of multilayer Laue lenses can also be difficult to measure, given the size of the thin film layers. I employ my knowledge of software and algorithms to further ease these previously painstaking processes with custom programs. Additionally, I will give an overview of an x-ray optic simulator package I helped develop during the summer of 2010. In the interest of keeping my software free and open, I have worked mostly with the multiplatform Python and the PyQt application framework, utilizing C and C++ where necessary.

Lauer K. R.; Conley R.

2010-12-01T23:59:59.000Z

497

Collaborative recommender systems for building automation  

E-Print Network (OSTI)

Building Automation Systems (BASs) can save building owners money by reducing energy consumption while simultaneously preserving occupant comfort. There are algorithms that optimize this tradeoff, such as detecting which appliances are turned on without requiring expensive status detectors to be attached to each appliance. However, better ways are needed to determine which algorithms are best-suited to a particular building. This paper explores the idea of allowing building managers to automatically communicate among themselves and exchange ratings of individual monitoring and control algorithms in such a way that each building manager can then obtain predicted ratings for all algorithms that he has not yet tried personally. We allow individual algorithms to be replaced by using a blackboard architecture to loosen the coupling between them. We propose a recommender system that operates on a database of contributed ratings to predict ratings of untried algorithms. To explore this approach, we developed a prototype that seamlessly interacts with both emulated physical buildings and buildings simulated in software and we implemented several of the control algorithms described in previous works. We demonstrate a recommender system that selects between algorithms in various types of buildings. 1.

Michael Lemay; Jason J. Haas; Carl A. Gunter

2009-01-01T23:59:59.000Z

498

Developing Automated Methods of Waste Sorting  

SciTech Connect

The U.S. Department of Energy (DOE) analyzed the need complex-wide for remote and automated technologies as they relate to the treatment and disposal of mixed wastes. This analysis revealed that several DOE sites need the capability to open drums containing waste, visually inspect and sort the contents, and finally repackage the containers that are acceptable at a waste disposal facility such as the Waste Isolation Pilot Plant (WIPP) in New Mexico. Conditioning contaminated waste so that it is compatible with the WIPP criteria for storage is an arduous task whether the waste is contact handled (waste having radioactivity levels below 200 mrem/hr) or remote handled. Currently, WIPP non-compliant items are removed from the waste stream manually, at a rate of about one 55-gallon drum per day. Issues relating to contamination-based health hazards as well as repetitive motion health hazards are steering industry towards a more user-friendly, method of conditioning or sorting waste.

Shurtliff, Rodney Marvin

2002-08-01T23:59:59.000Z

499

On-Site Generation Simulation with EnergyPlus for Commercial Buildings  

E-Print Network (OSTI)

http://tariffs.lbl.gov/ NSTAR electricity rates, http://expensive than volumetric electricity rates, DG may still beutilities NSTAR (NSTAR electricity rates) and Keyspan (

Stadler, Michael; Firestone, Ryan; Curtil, Dimitri; Marnay, Chris

2006-01-01T23:59:59.000Z

500

Process development for automated solar cell and module production. Task 4: automated array assembly. Quarterly report No. 2  

DOE Green Energy (OSTI)

Installation of the cell preparation station into its new enclosure is now complete and operation verification tests have been performed. The detailed layout drawings of the Automated Lamination Station have been produced and construction has begun. All major and most minor components have been delivered by vendors. The station framework has been built and assembly of components is underway. The final drawings for the Automated Vacuum Chamber are being completed and the first in-house components are being fabricated.

Hagerty, J. J.

1981-01-15T23:59:59.000Z