National Library of Energy BETA

Sample records for rapid acquisition time

  1. Acquisition Letter on the Implications of Time-Limited Funds

    Broader source: Energy.gov [DOE]

    The attached Acquisition Letter has been issued to provide guidance to Contracting Officers on the implications of time-limited funding on contract planning, award, and administration.

  2. Reducing acquisition times in multidimensional NMR with a time-optimized Fourier encoding algorithm

    SciTech Connect (OSTI)

    Zhang, Zhiyong; Smith, Pieter E. S.; Frydman, Lucio

    2014-11-21

    Speeding up the acquisition of multidimensional nuclear magnetic resonance (NMR) spectra is an important topic in contemporary NMR, with central roles in high-throughput investigations and analyses of marginally stable samples. A variety of fast NMR techniques have been developed, including methods based on non-uniform sampling and Hadamard encoding, that overcome the long sampling times inherent to schemes based on fast-Fourier-transform (FFT) methods. Here, we explore the potential of an alternative fast acquisition method that leverages a priori knowledge, to tailor polychromatic pulses and customized time delays for an efficient Fourier encoding of the indirect domain of an NMR experiment. By porting the encoding of the indirect-domain to the excitation process, this strategy avoids potential artifacts associated with non-uniform sampling schemes and uses a minimum number of scans equal to the number of resonances present in the indirect dimension. An added convenience is afforded by the fact that a usual 2D FFT can be used to process the generated data. Acquisitions of 2D heteronuclear correlation NMR spectra on quinine and on the anti-inflammatory drug isobutyl propionic phenolic acid illustrate the new method's performance. This method can be readily automated to deal with complex samples such as those occurring in metabolomics, in in-cell as well as in in vivo NMR applications, where speed and temporal stability are often primary concerns.

  3. Development of a Real-Time, High-Speed Distribution Level Data Acquisition System

    SciTech Connect (OSTI)

    Bank, J.; Kroposki, B.

    2012-01-01

    With the development of smart grids and the deployment of their enabling technologies, improved data acquisition will be needed at the distribution level to understand the full impact of these changes. With this in mind, NREL has developed a high-speed measurement and data collection network targeted specifically at the distribution level. This network is based around adaptable, rugged measurement devices designed for deployment at a variety of low and medium voltage locations below the sub-station. Each of these devices is capable of real-time data transmission via an Internet connection. Additionally, several analysis and visualization applications have been developed around the incoming data streams.

  4. Real-time data acquisition and telemetry based irrigation control system

    DOE Patents [OSTI]

    Slater, John M.; Svoboda, John M.

    2005-12-13

    A data acquisition and telemetry based control system for use in facilitating substantially real time management of an agricultural irrigation system. The soil moisture sensor includes a reader and a plurality of probes. The probes each include an electronic circuit having a moisture sensing capacitor in operative communication with the soil whose moisture is to be measured. Each probe also includes a receive/transmit antenna and the reader includes a transmit/receive antenna, so that as the reader passes near the probe, the reader transmits a digital excitation signal to the electronic circuit of the biodegradable probe via an inductive couple formed between the transmit/receive antenna of the reader and the receive/transmit coil of the probe. The electronic circuit uses an energy component of the excitation signal to generate a digital data signal which indicates the moisture content of the soil adjacent to the moisture sensing capacitor. The probe sends the data signal to the reader which then uses the data signal to develop a corresponding set of watering instructions which are then transmitted to a control module in communication with the irrigation system. The control module sends corresponding control signals to nozzles of the irrigation system causing the irrigation system to disperse water in a manner consistent with the moisture content data transmitted by the probes to the reader. Because the irrigation system moves continuously through the field to be irrigated, the moisture content data acquisition and resultant water dispersal by the irrigation system occur substantially in real time.

  5. Acquisition Guide

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Guide ------------------------ Chapter 71.1 (Dec 2014) HEADQUARTERS BUSINESS CLEARANCE PROCESS Guiding Principles  Timely acquisition planning is critical  Effective oversight control systems are essential to ensuring the high quality/integrity of procurement transactions  Collaboration and cooperation are required for timely, effective procurement processes Overview This chapter provides guidance regarding the policies and procedures governing the Field Assistance and

  6. NNSA?s Computing Strategy, Acquisition Plan, and Basis for Computing Time Allocation

    SciTech Connect (OSTI)

    Nikkel, D J

    2009-07-21

    This report is in response to the Omnibus Appropriations Act, 2009 (H.R. 1105; Public Law 111-8) in its funding of the National Nuclear Security Administration's (NNSA) Advanced Simulation and Computing (ASC) Program. This bill called for a report on ASC's plans for computing and platform acquisition strategy in support of stockpile stewardship. Computer simulation is essential to the stewardship of the nation's nuclear stockpile. Annual certification of the country's stockpile systems, Significant Finding Investigations (SFIs), and execution of Life Extension Programs (LEPs) are dependent on simulations employing the advanced ASC tools developed over the past decade plus; indeed, without these tools, certification would not be possible without a return to nuclear testing. ASC is an integrated program involving investments in computer hardware (platforms and computing centers), software environments, integrated design codes and physical models for these codes, and validation methodologies. The significant progress ASC has made in the past derives from its focus on mission and from its strategy of balancing support across the key investment areas necessary for success. All these investment areas must be sustained for ASC to adequately support current stockpile stewardship mission needs and to meet ever more difficult challenges as the weapons continue to age or undergo refurbishment. The appropriations bill called for this report to address three specific issues, which are responded to briefly here but are expanded upon in the subsequent document: (1) Identify how computing capability at each of the labs will specifically contribute to stockpile stewardship goals, and on what basis computing time will be allocated to achieve the goal of a balanced program among the labs. (2) Explain the NNSA's acquisition strategy for capacity and capability of machines at each of the labs and how it will fit within the existing budget constraints. (3) Identify the technical

  7. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -----Chapter 7.1 (February 2015) ACQUISITION PLANNING Guiding Principles  Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory, and policy requirements, and reflects the mission needs of the program.  An integrated team approach that includes appropriate representation from all organizations having an interest in the requirement will benefit the acquisition planning process.  Contracting professionals

  8. Developments in time-resolved high pressure x-ray diffraction using rapid compression and decompression

    SciTech Connect (OSTI)

    Smith, Jesse S.; Sinogeikin, Stanislav V.; Lin, Chuanlong; Rod, Eric; Bai, Ligang; Shen, Guoyin

    2015-07-15

    Complementary advances in high pressure research apparatus and techniques make it possible to carry out time-resolved high pressure research using what would customarily be considered static high pressure apparatus. This work specifically explores time-resolved high pressure x-ray diffraction with rapid compression and/or decompression of a sample in a diamond anvil cell. Key aspects of the synchrotron beamline and ancillary equipment are presented, including source considerations, rapid (de)compression apparatus, high frequency imaging detectors, and software suitable for processing large volumes of data. A number of examples are presented, including fast equation of state measurements, compression rate dependent synthesis of metastable states in silicon and germanium, and ultrahigh compression rates using a piezoelectric driven diamond anvil cell.

  9. Design and implementation of a rapid-mixer flow cell for time-resolved infrared microspectroscopy

    SciTech Connect (OSTI)

    Marinkovic, Nebojsa S.; Adzic, Aleksandar R.; Sullivan, Michael; Kovacs, Kevin; Miller, Lisa M.; Rousseau, Denis L.; Yeh, Syun-Ru; Chance, Mark R.

    2000-11-01

    A rapid mixer for the analysis of reactions in the millisecond and submillisecond time domains by Fourier-transform infrared microspectroscopy has been constructed. The cell was tested by examination of cytochrome-c folding kinetics. The device allows collection of full infrared spectral data on millisecond and faster time scales subsequent to chemical jump reaction initiation. The data quality is sufficiently good such that spectral fitting techniques could be applied to analysis of the data. Thus, this method provides an advantage over kinetic measurements at single wavelengths using infrared laser or diode sources, particularly where band overlap exists.

  10. Flexible attosecond beamline for high harmonic spectroscopy and XUV/near-IR pump probe experiments requiring long acquisition times

    SciTech Connect (OSTI)

    Weber, S. J. Manschwetus, B.; Billon, M.; Bougeard, M.; Breger, P.; Géléoc, M.; Gruson, V.; Lin, N.; Ruchon, T.; Salières, P.; Carré, B.

    2015-03-15

    We describe the versatile features of the attosecond beamline recently installed at CEA-Saclay on the PLFA kHz laser. It combines a fine and very complete set of diagnostics enabling high harmonic spectroscopy (HHS) through the advanced characterization of the amplitude, phase, and polarization of the harmonic emission. It also allows a variety of photo-ionization experiments using magnetic bottle and COLTRIMS (COLd Target Recoil Ion Momentum Microscopy) electron spectrometers that may be used simultaneously, thanks to a two-foci configuration. Using both passive and active stabilization, special care was paid to the long term stability of the system to allow, using both experimental approaches, time resolved studies with attosecond precision, typically over several hours of acquisition times. As an illustration, applications to multi-orbital HHS and electron-ion coincidence time resolved spectroscopy are presented.

  11. Acquisition Guide

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (i.e., Federal Acquisition Regulation) as the Head of the Contracting Activity (HCA). ... requirements of the Federal Acquisition Regulation (FAR), the DOE Acquisition Regulation ...

  12. Time-Resolved In Situ Measurements During Rapid Alloy Solidification: Experimental Insight for Additive Manufacturing

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    McKeown, Joseph T.; Zweiacker, Kai; Liu, Can; Coughlin, Daniel R.; Clarke, Amy J.; Baldwin, J. Kevin; Gibbs, John W.; Roehling, John D.; Imhoff, Seth D.; Gibbs, Paul J.; et al

    2016-01-27

    In research and industrial environments, additive manufacturing (AM) of metals and alloys is becoming a pervasive technology, though significant challenges remain before widespread implementation of AM can be realized. In situ investigations of rapid alloy solidification with high spatial and temporal resolutions can provide unique experimental insight into microstructure evolution and kinetics that are relevant for AM processing. Hypoeutectic thin-film Al–Cu and Al–Si alloys were investigated using dynamic transmission electron microscopy to monitor pulsed-laser-induced rapid solidification across microsecond timescales. Solid–liquid interface velocities measured from time-resolved images revealed accelerating solidification fronts in both alloys. We observed microstructure evolution, solidification product, andmore » presence of a morphological instability at the solid–liquid interface in the Al–4 at.%Cu alloy are related to the measured interface velocities and small differences in composition that affect the thermophysical properties of the alloys. These time-resolved in situ measurements can inform and validate predictive modeling efforts for AM.« less

  13. ACQUISITION PLANNING

    Broader source: Energy.gov (indexed) [DOE]

    Management for the Acquisition of Capital Assets 22. DOE O 436.1 Departmental Sustainability 23. DOE G 413.3-13 Acquisition Strategy Guide for Capital Asset Projects 24. DOE O...

  14. Acquisition Guide

    Energy Savers [EERE]

    _____________________________________________________________ __________________________________________________Chapter 15.4-4 (December 2010) GENERAL GUIDE FOR TECHNICAL ANALYSIS OF COST PROPOSALS FOR ACQUISITION CONTRACTS Acquisition Guide _____________________________________________________________ __________________________________________________Chapter 15.4-4 (November 2010) TABLE OF CONTENT CHAPTER 1 - INTRODUCTION KEY CONCEPTS

  15. Emergency Acquisitions

    Broader source: Energy.gov [DOE]

    The Office of Federal Procurement Policy, (OFPP) updated the Emergency Acquisitions Guide which is an attachment. The Acquisition Guide Chapter 18.0 Emergency Acquisitions is revised to incorporate Federal Acquisition Regulation changes through Federal Acquisition Circular 2005-49 and parts of the OFPP guide. Both the OFPP guide and the Department of Energy guide chapter may assist the contracting community with planning and carrying out procurement requirements during major disaster declarations, other emergencies, contingency operations, or defense or recovery from certain attacks.

  16. Acquisition Regulation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 August 24, 2015 ACQUISITION LETTER This Acquisition Letter is issued under the authority of the Senior Procurement Executives of DOE and NNSA. It is intended for use by procurement professionals of DOE and NNSA, primarily Contracting Officers, and other officials of DOE and NNSA that are involved in the acquisition process. Other parties are welcome to its information, but definitive interpretations of its effect on contracts, and related procedures, if any, may only be made by DOE NNSA

  17. Acquisition Regulation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    .1 * * ~, No. AL-2015-09 Date August 25, 2015 fJ~ ~* - . *--~o' 1 '.j ! t :i ?';; * ~~* ~'~"l'ES'ffito":J ACQUISITION LETTER This Acquisition Letter is issued under the authority of the Senior Procurement Executives of DOE and NNSA Subject: Conference Related Activities and Spending References: Deputy Secretary Memorandum of 8/ 17I15 When is this Acquisition Letter (AL) effective? This AL is effective immediately upon issuance. When does this AL expire? Updated Guidance on Conference-

  18. Acquisition Regulation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Rev. 1 Date 09/09/2015 Department of Energy No. FAL 2015-04 Rev. 1 Date 09/09/2015 Financial Assistance Regulations ACQUISITION/FINANCIAL ASSISTANCE LETTER This Acquisition/Financial Assistance Letter is issued under the authority of the Senior Procurement Executive of DOE. It is intended for use by procurement professionals of DOE, primarily Contracting Officers, and other officials of DOE that are involved in the acquisition process. Other parties are welcome to its information, but

  19. ACQUISITION LETTER

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ACQUISITION LETTER AUTHORITY This Acquisition Letter (AL) is issued by the Procurement Executive pursuant to a delegation from the Secretary and under the authority of the Department of Energy Acquisition Regulation (DEAR) subsection 901.301-70. CONTENTS CITATION TITLE DEAR Part 933 Protests, Disputes, and Appeals I. Purpose. This AL establishes policy and provides guidance for the use of alternative dispute resolution techniques in connection with disputes that arise under the Contract Disputes

  20. Interagency Acquisitions

    Broader source: Energy.gov [DOE]

    Acquisition Letter (AL) 2011-01 has been issued to disseminate the Office of Management and Budget (OMB) guidance on how to structure and format interagency acquisitions. Contracting officers are to ensure that new interagency agreements are supported by a best determination. All interagency agreements for assistance acquisition must contain specific elements as described in the OMB guidance. The Work for Others program is excluded from this AL.

  1. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    OPERATING CONTRACTS | Department of Energy ACQUISITION GUIDE CHAPTER 42.101: AUDIT REQUIREMENTS FOR NON-MANAGEMENT AND OPERATING CONTRACTS ACQUISITION GUIDE CHAPTER 42.101: AUDIT REQUIREMENTS FOR NON-MANAGEMENT AND OPERATING CONTRACTS A new chapter (42.101) has been added to the Acquisition Guide. It addresses how the Contracting Officer should view the vital, sometimes required by regulation, sometimes required by Department policy, and sometimes dictated by prudence, role of auditors in:

  2. Acquisition Regulation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Career Development, Contracting Authority and Responsibilities Acquisition Regulation ... file, except for any documents required by regulation to be maintained in paper copy. ...

  3. Acquisition Regulation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Date 05/12/2015 ACQUISITION LETTER This Acquisition Letter is issued under the authority of the DOE and NNSA Senior Procurement Executives. Acquisition Letters (AL) that remain in effect are identified below. All other previously issued ALs have been superseded by a formal rule-making, incorporated into other guidance, and/or canceled. ** ************** ACQUISITION LETTERS REMAINING IN EFFECT NUMBER DATE SUBJECT 93-4 04/07/1993 Displaced Workers Benefits Program 94-19 12/09/1994 Basic Labor

  4. ACQUISITION PLANNING

    Broader source: Energy.gov (indexed) [DOE]

    - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding...

  5. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... In addition, DOE Order 413.3B, Program and Project Management for the Acquisition ... proposals Basic research from non-profit organizations Competitive procurement of ...

  6. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... proposals Basic research from non-profit organizations Competitive procurement of ... PLAN FOR ACTION AND ACQUISITION MANAGEMENT -- ANSWERS WHO, WHAT, WHEN, WHERE, ...

  7. Acquisition Guide

    Energy Savers [EERE]

    Officer's Representative Certification (COR) | Department of Energy Career Management Handbook Change - Revised Contracting Officer's Representative Certification (COR) Acquisition Career Management Handbook Change - Revised Contracting Officer's Representative Certification (COR) A recent review of the January 2009 issue of the Department of Energy (DOE) Acquisition Career Management Program (ACMP) Handbook identified many areas that require an update. Although the ACMP Handbook revisions

  8. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    January 2011) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award

  9. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    -Chapter 7.1 (May 2012) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award

  10. Acquisition Templates

    Broader source: Energy.gov [DOE]

    On September 28, 2010, four draft acquisition templates (Competitive Range Exclusion Letter, Competitive Range Inclusion Letter - Written Discussions, Competitive Range Inclusion Letter - Written and Oral Discussions, and Proposal Receipt Checklist) were distributed for Procurement Director (PD) and Head of Contracting Activity (HCA) review and comment. All comments received were considered and changes were made as appropriate. The final versions of the four aforementioned acquisition templates will be e-mailed directly to the Procurement Directors and made available in the STRIPES Library.

  11. The effect of diluent gases on ignition delay times in the shock tube and in the rapid compression machine

    SciTech Connect (OSTI)

    Wuermel, J.; Silke, E.J.; Curran, H.J.; O Conaire, M.S.; Simmie, J.M.

    2007-10-15

    The diluent gas used in the preparation of test fuel/oxygen mixtures is inert and does not take part in the chemical reaction. However, it does have an effect on the measured ignition delay time both in rapid compression machines and in shock tubes - argon decelerates ignition in the RCM, but accelerates it in the shock tube under some conditions. This opposite effect is due to the times scales involved in these experimental devices. Typical ignition delay times in the RCM are in the region of 1-200 ms, while those in the shock tube are much shorter (10-1000 {mu}s). Comparative RCM experiments and simulations for helium, argon, xenon, and nitrogen have shown extreme heat loss in the postcompression period, particularly for helium. Autoignition measurements of 2,3-dimethylpentane have highlighted a direct dependency of ignition delay time on the type of diluent used, where longer ignition delay time were recorded with argon. This increased ignition delay time is due to the extreme cooling of argon in the postcompression period. This observation was strengthened by comparative experiments with helium and argon, where the diluent effect was even stronger for helium, caused by its higher thermal conductivity. In the shock tube, the diluent effect is opposite to that in the RCM. For dilute mixtures of isooctane, calculations have predicted that mixtures with argon will ignite faster than those with nitrogen, based on the relative heat capacities of the two diluent gases. Overall, we conclude that the choice of diluent gases in experimental devices must be made with care, as ignition delay times can depend strongly on the type of diluent gas used. (author)

  12. Assessment of the 60 km rapid update cycle (RUC) with near real-time aircraft reports. Project report

    SciTech Connect (OSTI)

    Cole, R.E.; Richard, C.; Kim, S.; Bailey, D.

    1998-07-15

    The National Aeronautics and Space Administration (NASA) is developing the Center-TRA-CON Advisory System (CTAS), a set of Air Traffic Management (ATM) Decision Support Tools (DST) for en route (Center) and terminal (TRACON) airspace designed to enable controllers to increase capacity and flight efficiency. A crucial component of the CTAS, or any ATM DST, is the computation of the time-of-flight of aircraft along flight path segments. Earlier NASA studies show that accurate knowledge of the wind through which the aircraft are flying is required to estimate time-of-flight accurately. There are current envisioned to be two sources of wind data for CTAS: The Rapid Update Cycle (RUC) for the Center airspace, a numerical model developed by the National Oceanic and Atmospheric Administration (NOAA) Forecast System Laboratory (FSL) and run operationally by the National Weather Service (NWS) National Center for Environmental Prediction (NCEP); and The Integrated Terminal Weather System (ITWS) Terminal Winds (TW) for the TRACON airspace, developed at MIT Lincoln Laboratory under funding from the Federal Aviation Administration (FAA). This study has three goals: (1) determine the errors in the baseline 60 km resolution RUC forecast wind fields relative to the needs of en route DSTs such as CTAS, (2) determine the benefit of using the TW algorithm to refine the RUC forecast wind fields with near real-time Meteorological Data Collection and Reporting System (MDCRS) reports, and (3) identify factors that influence wind errors in order to improve accuracy and estimate errors in real time.

  13. Acquisition Forecast | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Forecast Acquisition Forecast Acquisition Forecast It is the policy of the U.S. Department of Energy (DOE) to provide timely information to the public regarding DOE's forecast of future prime contracting opportunities and subcontracting opportunities which are available via the Department's major site and facilities management contractors. This forecast has been expanded to also provide timely status information for ongoing prime contracting actions that are valued in excess of the

  14. Data acquisition system

    DOE Patents [OSTI]

    Shapiro, Stephen L.; Mani, Sudhindra; Atlas, Eugene L.; Cords, Dieter H. W.; Holbrook, Britt

    1997-01-01

    A data acquisition circuit for a particle detection system that allows for time tagging of particles detected by the system. The particle detection system screens out background noise and discriminate between hits from scattered and unscattered particles. The detection system can also be adapted to detect a wide variety of particle types. The detection system utilizes a particle detection pixel array, each pixel containing a back-biased PIN diode, and a data acquisition pixel array. Each pixel in the particle detection pixel array is in electrical contact with a pixel in the data acquisition pixel array. In response to a particle hit, the affected PIN diodes generate a current, which is detected by the corresponding data acquisition pixels. This current is integrated to produce a voltage across a capacitor, the voltage being related to the amount of energy deposited in the pixel by the particle. The current is also used to trigger a read of the pixel hit by the particle.

  15. Test Acquisition Guide

    Broader source: Energy.gov [DOE]

    Regulatory requirements for the acquisition process are set forth in the Federal Acquisition Regulation (FAR) and are supplemented in the Department of Energy Acquisition Regulation (DEAR). FAR 1...

  16. Acquisition Letter No. 2012-06 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Acquisition Letter on the Implications of Time-Limited Funds SUMMARY:...

  17. Data acquisition system

    DOE Patents [OSTI]

    Phillips, David T.

    1979-01-01

    A data acquisition system capable of resolving transient pulses in the subnanosecond range. A pulse in an information carrying medium such as light is transmitted through means which disperse the pulse, such as a fiber optic light guide which time-stretches optical pulses by chromatic dispersion. This time-stretched pulse is used as a sampling pulse and is modulated by the signal to be recorded. The modulated pulse may be further time-stretched prior to being recorded. The recorded modulated pulse is unfolded to derive the transient signal by utilizing the relationship of the time-stretching that occurred in the original pulse.

  18. Federal Acquisition Regulation Federal Acquisition Circular 2005...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Regulation Federal Acquisition Circular 2005-86 Summary of Rules FAC 2005-86 Item Subject FAR Case I Definition of "Multiple-Award Contract" 2015-019 II Sole Source ...

  19. ACQUISITION PLANNING | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ACQUISITION PLANNING ACQUISITION PLANNING PDF icon ACQUISITION PLANNING More Documents & Publications ACQUISITION PLANNING Policy Flash 2015-13 POLICY FLASH 2014-25 Revision to the...

  20. ACQUISITION PLANNING | Department of Energy

    Energy Savers [EERE]

    ACQUISITION PLANNING ACQUISITION PLANNING ACQUISITION PLANNING More Documents & Publications ACQUISITION PLANNING Attachment FY2011-13 Attachment FY2011-40(3)...

  1. Acquisitions___Communications.pdf

    Energy Savers [EERE]

    Archive listing Acquisition Letter Archive listing Acquisition Letter Archive listing (161.94 KB) More Documents & Publications Microsoft Word - LibraryofPriorRulemakings.doc Acquisition Letters Remaining in Effect Policy Flash Archive Search File

    NO. AL 2016-05 Acquisition Letter NO. AL 2016-05 DATE: May 3, 2016 TO: Procurement Directors FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: AL 2016-05-Determining if an

  2. Federal Acquisition Regulation Federal Acquisition Circular 2005...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Summary of Rules Item Subject FAR Case I. Updates to Contract Reporting and Central 2010-014 Contractor Registration II. Interagency Acquisitions: Compliance by Nondefense ...

  3. Rapid Diagnosis of Tuberculosis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rapid Diagnosis of Tuberculosis Rapid Diagnosis of Tuberculosis Rapid diagnosis of active tuberculosis to minimize associated mortality, and facilitate timely countermeasures A novel pathogen biomarker-based assay for the diagnosis of active tuberculosis and validated it in a blinded clinical study. Current diagnosis of active tuberculosis is inadequate, especially with HIV co-infection in endemic populations Detection of a suite of pathogen biomarkers using novel strategies Rapid, early

  4. Acquisition Guide, Chapter 38.1, Strategic Acquisition Transactions...

    Broader source: Energy.gov (indexed) [DOE]

    The Strategic Acquisition Transactions Guide has been updated to reflect changes in the Federal Acquisition Regulation through Federal Acquisition Circular 2005-38 and other ...

  5. Sustainable Acquisition, Federal and Department of Energy Acquisition...

    Broader source: Energy.gov (indexed) [DOE]

    PF2011-08 Sustainable Acquisition, Federal and Department of Energy Acquisition Regulation Amendments (89.35 KB) More Documents & Publications DOE Acquisition Guide Chapter 23 ...

  6. Acquisition Guide Chapter 17.1 - Interagency Acquisitions, Interagency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Guide Chapter 17.1 - Interagency Acquisitions, Interagency transactions, and Interagency Agreements is revised to incorporate (1) Federal Acquisition Circular (FAC) ...

  7. AVLIS Laser Data Acquisition and Control System

    SciTech Connect (OSTI)

    Gill, T.E.

    1986-01-01

    The AVLIS Laser Data Acquisition and Control System provides an integrated hardware and software package which controls up to five diagnostic lasers and automatic and manual data acquisition and reduction subsystems being used to analyze uranium vapor density in the Atomic Vapor Laser Isotope Separation (AVLIS) separation vessel in Oak Ridge, Tennessee. This paper discusses acquisition of critical real-time and post-run vapor density data.

  8. Acquisition Letter Archive Listing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Acquisitions 2007-04, 2282007, Working Safety and Health for Contractor Employees, 10 CFR 851 2007-05, 3292007, PDF, Acquisition Letters Remaining in Effect 2007-06, 662007, ...

  9. ACQUISITION PLANNING | Department of Energy

    Office of Environmental Management (EM)

    More Documents & Publications 7pt1AcquisitionPlanning.pdf Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning Update of Acquisition Guide Chapter 7.1, Acquisition Planning

    ACQUISITION PLANNING (742.74 KB) More Documents & Publications Acquisition Guide Chapter 7.1 - Acquisition Planning Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Policy Flash 2015-13

  10. Simplified Acquisition Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ------------------------- Chapter 13.3 (March 2014) 1 [Reference: FAR Subpart 13. 3 and FAR Subpart 13.5] Simplified Acquisition Procedures 1. Introduction Simplified Acquisition Procedures (SAP) are contracting methods designed to streamline the acquisition process and facilitate the procurement of goods and services. The results include less paperwork and lower costs for both the contractor and the Government. FAR 13.003(a) states, "Agencies shall use simplified acquisition procedures to

  11. Interagency Acquisitions | Department of Energy

    Office of Environmental Management (EM)

    Acquisition Letter (AL) 2011-03 has been updated to incorporate Federal Acquisition Circular (FAC) 2005-47 which published an interim Federal Acquisition Regulation (FAR) rule ...

  12. Sustainable Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Sustainable Acquisition Sustainable Acquisition Mission The team establishes a national approach to expand purchases of sustainable goods and services, including ...

  13. Acquisition Career Development Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-04-19

    This Order establishes training and certification requirements and career development programs under the Acquisition Career Development (ACD) Program for DOE and NNSA acquisition workforce. The acquisition workforce includes contracting, purchasing, personal property management, program management, Contracting Officers and Contracting Officer Representatives. The ACD Program implements the Office of Federal Procurement Policy (OFPP) requirements, Federal Acquisition Regulation (FAR) requirements, Federal Acquisition Reform Act (FARA) requirements, and the objectives of Executive Order (E.O.) 129231, Federal Procurement Reform, dated 10-13-1994. This order cancels DOE O 361.1, Acquisition Career Development Program, dated 11-10-99, AND Acquisition Letter 2003-05, Personal Property Management Career Development, Training, and Certification Program, dated 9-10-03. Cancels DOE O 361.1 Chg 2. Canceled by DOE O 361.1B.

  14. Sustainable Acquisition, Federal and Department of Energy Acquisition

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulation Amendments | Department of Energy Sustainable Acquisition, Federal and Department of Energy Acquisition Regulation Amendments Sustainable Acquisition, Federal and Department of Energy Acquisition Regulation Amendments Executive Order 13514, Federal Leadership in Environmental, Energy and Economic Performance was issued October 5, 2009. Among its purposes were the promotion of sustainable acquisition, including energy, fuel, and water efficiency PF2011-08 Sustainable Acquisition,

  15. Acquisition Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EM Contractors for Capital Asset Projects Acquisition and Project Management Continuous Improvement Presentation Acquisition and Project Management Continuous Improvement Report ...

  16. Acquisition Career Development Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-12-20

    To set forth requirements and responsibilities for the Department of Energy (DOE) Acquisition Career Development (ACD) Program, which implements Office of Federal Procurement Policy (OFPP) requirements, Federal Acquisition Regulation (FAR) requirements, Federal Acquisition Reform Act (FARA) requirements, and the career development objectives of Executive Order (E.O.) 12931. Change 1 approved 12-20-2001. Cancels DOE O 361.1. Canceled by DOE O 361.1 Chg 2.

  17. Acquisition Career Development Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-06-13

    To set forth requirements and responsibilities for the Department of Energy (DOE) Acquisition Career Development (ACD) Program, which implements Office of Federal Procurement Policy (OFPP) requirements, Federal Acquisition Regulation (FAR) requirements, Federal Acquisition Reform Act (FARA) requirements, and the career development objectives of Executive Order (E.O.) 12931. Change 1 approved 12-20-2001. Change 2 approved 06-13-03. Cancels DOE O 361.1 Chg 1. Canceled by DOE O 361.1A.

  18. Acquisition Career Development Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-11-10

    The Order implements the Department's Acquisition Career Development program, mandatory for professionals in the GS-1102 and 1105 occupational procurement series, as well as others with significant procurement responsibilities. The Order also ensures that members of the acquisition workforce are aware of and adhere to the mandatory training and certification requirements. Cancels Acquisition Letter 98-06. Canceled by DOE O 361.1 Chg 1.

  19. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy DOE Acquisition Guide Chapter 7.1 Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Acquisition Guide Chapter 7.1 is revised to remind the planner when planning for an interagency acquisition to perform a determination of best procurement approach, business case analysis and/or Economy Act determinations and findings, as applicable, in accordance with Federal Acquisition Regulation (FAR) 17.5 Interagency Acquisitions. Revisions to the guide chapter add to

  20. Acquisition Career Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-01-24

    The order defines requirements and responsibilities for training, certification, and career development programs for the DOE acquisition workforce. Cancels DOE O 361.1A.

  1. Status of Acquisition Letters

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workers under Service Contracts Jason Taylor Active until rulemaking is complete 6 ... Management and Operating Contracts Jason Taylor Superseded by coverage in the Acquisition ...

  2. Acquisition Career Management Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-05-14

    The order sets forth requirements and responsibilities for the Department of Energy (DOE) Acquisition Career Management Program. Supersedes DOE O 361.1B.

  3. Applying automated data acquisition and management technology to bioremediation

    SciTech Connect (OSTI)

    Widing, M.A.; Leser, C.

    1995-06-01

    Operating a bioremediation process requires timely and accurate analysis of physical and chemical parameters that can affect the system. At a fuel oil spill site, the operation of an in-situ bioremediation system, consisting of fluid and nutrient injection, fluid withdrawal, and aeration cycles, is monitored by means of electronic downhole sensors and on-site chemical analysis. A data acquisition and management system was designed and implemented to rapidly analyze data for operational decision malting. A hardware suite, containing an electronic monitoring system data acquisition computer, and data analysis workstation, was also developed. Through the use of both commercial software products and custom software, suites of data management and analysis tools were provided. The data acquisition suite of software tools assisted in programming dataloggers, automatically recording monitored data, and integrating these data with manually sampled chemical data. The data analysis suite of software tools assisted in downloading data to remote workstations, sampling the database for trend analysis, and automating the interface to commercial analysis packages.

  4. Aerial robotic data acquisition system

    SciTech Connect (OSTI)

    Hofstetter, K.J.; Hayes, D.W.; Pendergast, M.M.; Corban, J.E.

    1993-12-31

    A small, unmanned aerial vehicle (UAV), equipped with sensors for physical and chemical measurements of remote environments, is described. A miniature helicopter airframe is used as a platform for sensor testing and development. The sensor output is integrated with the flight control system for real-time, interactive, data acquisition and analysis. Pre-programmed flight missions will be flown with several sensors to demonstrate the cost-effective surveillance capabilities of this new technology.

  5. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7...

    Office of Environmental Management (EM)

    business case analysis andor Economy Act determinations and findings, as applicable, in accordance with Federal Acquisition Regulation (FAR) 17.5 Interagency Acquisitions. ...

  6. Acquisition Guide Chapter 1.0- Acquisition Regulations System

    Broader source: Energy.gov [DOE]

    This section discusses the Civilian Agency Acquisition Council, agency acquisition regulations, deviations from the FAR and DEAR, ratification of unauthorized commitments, and Contracting Officers and their representatives.

  7. OPAM Policy Acquisition Guides

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 17.3 (February 2004) Acquisition, Use, and Disposal of Real Estate [Reference: DEAR 917.74, 970.5244-1] Overview This section provides internal Departmental information and a DOE point of contact for issues dealing with real estate acquisition, use, and disposal. Background DEAR 917.74 provides the policy and procedures to be followed in the acquisition, use, and disposal of real estate. In accordance with DEAR clause 970.5244-1, Management and Operating contractors also follow the DEAR

  8. Customer Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soft Costs Customer Acquisition Customer Acquisition Photo of a woman, man, and child looking at a silver box on the outside of a home. Customer acquisition costs in the solar ...

  9. Acquisition & Financial Assistance Rules Status | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition & Financial Assistance Rules Status Acquisition & Financial Assistance Rules Status Subscribe to Acquisition & Financial Assistance Rules Status Updates PDF icon ...

  10. Small Business Issues for Environmental Restoration Acquisitions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issues for Environmental Restoration Acquisitions Small Business Issues for Environmental Restoration Acquisitions Small Business Issues for Environmental Restoration Acquisitions ...

  11. Enabling Sustainable Acquisition by Improving Procurement Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enabling Sustainable Acquisition by Improving Procurement Systems Enabling Sustainable Acquisition by Improving Procurement Systems Enabling Sustainable Acquisition by Improving ...

  12. Acquisition Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Program Acquisition Program Southeastern's acquisition initiatives are met as a result of requirements from our programs and projects that accomplish our agency's mission. In order to follow the Federal Acquisition Regulations regarding announcement of acquisition opportunities, all acquisitions that exceed $25,000 will be published electronically by Southeastern Power Administration. Contact Information For more information, please contact Ann Craft Phone: 706.213.3823

  13. IT Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition IT Acquisition computer-957001_960_720.jpg Acquisition The Chief Information Officer (CIO) guides and manages the Department's effective use of information technology (IT) and IT resources. When acquiring IT solutions, the CIO seeks to integrate project, financial, and acquisition management, and quality oversight methods into a cohesive process to achieve program goals. The Acquisition Management Division uses a variety of IT acquisition solutions, managed in an integrated fashion

  14. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 - Simplified Acquisition Procedures POLICY FLASH 2014-23 Acquisition Guide 13.3 Simplified Acquisition Procedures OPAM Policy Acquisition Guides...

  15. Acquisition and Project Management

    National Nuclear Security Administration (NNSA)

    4%2A en Acquisition and Project Management Office volunteers get up-close look at Office of Secure Transportation exercise http:nnsa.energy.govblogacquisition-and-project-mana...

  16. Sustaninable Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sustaninable Acquisition Sustaninable Acquisition Federal agencies are required to give preference to products that are energy efficient, water efficient, made from biobased or ...

  17. Acquisition Guide Chapter 1.1 - Acquisition Regulations System - (March

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2004) | Department of Energy 1 - Acquisition Regulations System - (March 2004) Acquisition Guide Chapter 1.1 - Acquisition Regulations System - (March 2004) Guiding Principles * Authority is delegated to the maximum practical extent. * Reviews and approvals are minimized and the layering of review is avoided. * Participants in the acquisition process work together as a team and are empowered to make decisions in the areas of responsibility. OPAM Policy Acquisition Guides (80.8 KB) More

  18. Time

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 4 5 6 7 8 9 10 Time with respect to the BNB Trigger Time [µs] 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 Fractional Flash Count per 0.15 µs with respect to Cosmic Background Measured Cosmic Rate (Beam-Off) BNB Trigger Data (Beam-On) [4.51E18 POT]

  19. Time

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10 15 20 Time with respect to the NuMI Trigger Time [µs] 0.9 1.0 1.1 1.2 1.3 1.4 1.5 Fractional Flash Count per 0.5 µs with respect to Cosmic Background Measured Cosmic Rate (Beam-Off) NuMI Trigger Data (Beam-On) [4.83E18 POT]

  20. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 - Protests, Disputes and Appeals ACQUISITION LETTER DEAR Part 933 Microsoft Word - ACQUISITION LETTER...

  1. Sustainable Acquisition Developments

    Broader source: Energy.gov [DOE]

    The Administration continues its emphasis on sustainable acquisition. Attached are 2 letters describing recent developments. The first is dated October 5, 2011, from OFPP Administrator, Daniel Gordon, describing the 95% goal, emphasizing the importance of the program and forecasting changes in the Federal Procurement Data System. Second is a letter from the Defense Procurement and Acquisition Policy Office dated October 4, 2011, furnishing some details regarding changes being made in the Federal Procurement Data System to better enable report of accomplishments. Expect to receive more information from the Information Systems Division of the OCIO as the FPDS changes are made.

  2. Acquisition Guide 13.3 Simplified Acquisition Procedures

    Office of Energy Efficiency and Renewable Energy (EERE)

    The subject Acquisition Guide is revised to provide a knowledge base that may support the increase of single purchase limits based on the criteria established by the Federal Acquisition Regulations...

  3. POLICY FLASH 2014-23 Acquisition Guide 13.3 Simplified Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    23 Acquisition Guide 13.3 Simplified Acquisition Procedures POLICY FLASH 2014-23 Acquisition Guide 13.3 Simplified Acquisition Procedures Questions concerning this policy flash...

  4. Department of Energy Acquisition System - A Guide for Executives |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Acquisition System - A Guide for Executives Department of Energy Acquisition System - A Guide for Executives The principal purposes of the Department's acquisition system are to: Deliver on a timely basis the best value product or service to the customer by, for example, Maximizing the use of commercial products and services. Using contractors who have a track record of successful past performance or who demonstrate a current superior ability to perform. Promoting

  5. ACQUISITION LETTER DEAR Part 933

    Broader source: Energy.gov [DOE]

    This Acquisition Letter (AL) is issued by the Procurement Executive pursuant to a delegation from the Secretary and under the authority of the Department of Energy Acquisition Regulation (DEAR) subsection 901.301-70.

  6. Acquisition Letters | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    August 11, 2006 Acquisition Letter No. AL 2006-10 Class Deviation for Certain DEAR Intellectual Property Clauses October 24, 1993 Acquisition Letter No. AL 1994-19 Basic...

  7. Acquisition Letters Remaining In Effect

    Office of Energy Efficiency and Renewable Energy (EERE)

    From Acquisition Letter (Acquisition Letters (AL) that remain in effect are identified below. All other previously issued Als have been superseded by a formal rule-making, incorporated into other guidance, and/or canceled.)

  8. Performance Based Service Acquisition Toolkit

    Broader source: Energy.gov [DOE]

    Performance-based Service Acquisition (PBA) means an acquisition structured around the results to be achieved as opposed to the manner by which the work is to be performed.

  9. Data acquisition instruments: Psychopharmacology

    SciTech Connect (OSTI)

    Hartley, D.S. III

    1998-01-01

    This report contains the results of a Direct Assistance Project performed by Lockheed Martin Energy Systems, Inc., for Dr. K. O. Jobson. The purpose of the project was to perform preliminary analysis of the data acquisition instruments used in the field of psychiatry, with the goal of identifying commonalities of data and strategies for handling and using the data in the most advantageous fashion. Data acquisition instruments from 12 sources were provided by Dr. Jobson. Several commonalities were identified and a potentially useful data strategy is reported here. Analysis of the information collected for utility in performing diagnoses is recommended. In addition, further work is recommended to refine the commonalities into a directly useful computer systems structure.

  10. Acquisition Conflict Resolution

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Acquisition & Project Management NNSA Statement Regarding Nevada National Security Site Management & Operating Contract WASHINGTON - On August 26, 2016, the Department of Energy's National Nuclear Security Administration (DOE/NNSA) awarded the contract for the management and operation of the Nevada National Security Site (NNSS) to Nevada Site Science Support and Technologies Corporation (NVS3T). The... NNSA Awards Nevada National Security Site Management & Operating Contract to NVS3T

  11. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    75.04 KB) More Documents & Publications DOE Acquisition Guide Chapter 15.1 Source Selection Guide Acquisition Guide Chapter 15 1 - Source Selection Guide Acquisition Templates

  12. Walnut Capital Acquisitions | Open Energy Information

    Open Energy Info (EERE)

    Walnut Capital Acquisitions Jump to: navigation, search Name: Walnut Capital Acquisitions Place: Pittsburgh, Pennsylvania Zip: 15232 Product: Walnut Capital Acquisitions is the...

  13. Multiple channel data acquisition system

    DOE Patents [OSTI]

    Crawley, H. Bert; Rosenberg, Eli I.; Meyer, W. Thomas; Gorbics, Mark S.; Thomas, William D.; McKay, Roy L.; Homer, Jr., John F.

    1990-05-22

    A multiple channel data acquisition system for the transfer of large amounts of data from a multiplicity of data channels has a plurality of modules which operate in parallel to convert analog signals to digital data and transfer that data to a communications host via a FASTBUS. Each module has a plurality of submodules which include a front end buffer (FEB) connected to input circuitry having an analog to digital converter with cache memory for each of a plurality of channels. The submodules are interfaced with the FASTBUS via a FASTBUS coupler which controls a module bus and a module memory. The system is triggered to effect rapid parallel data samplings which are stored to the cache memories. The cache memories are uploaded to the FEBs during which zero suppression occurs. The data in the FEBs is reformatted and compressed by a local processor during transfer to the module memory. The FASTBUS coupler is used by the communications host to upload the compressed and formatted data from the module memory. The local processor executes programs which are downloaded to the module memory through the FASTBUS coupler.

  14. Multiple channel data acquisition system

    DOE Patents [OSTI]

    Crawley, H.B.; Rosenberg, E.I.; Meyer, W.T.; Gorbics, M.S.; Thomas, W.D.; McKay, R.L.; Homer, J.F. Jr.

    1990-05-22

    A multiple channel data acquisition system for the transfer of large amounts of data from a multiplicity of data channels has a plurality of modules which operate in parallel to convert analog signals to digital data and transfer that data to a communications host via a FASTBUS. Each module has a plurality of submodules which include a front end buffer (FEB) connected to input circuitry having an analog to digital converter with cache memory for each of a plurality of channels. The submodules are interfaced with the FASTBUS via a FASTBUS coupler which controls a module bus and a module memory. The system is triggered to effect rapid parallel data samplings which are stored to the cache memories. The cache memories are uploaded to the FEBs during which zero suppression occurs. The data in the FEBs is reformatted and compressed by a local processor during transfer to the module memory. The FASTBUS coupler is used by the communications host to upload the compressed and formatted data from the module memory. The local processor executes programs which are downloaded to the module memory through the FASTBUS coupler. 25 figs.

  15. Federal Acquisition Regulation Federal Acquisition Circular 2005...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Summary of Rules Item Subject FAR Case I. Definition of Contingency Operation (Interim) 2013-003 II. Changes to Time-and-Materials and Labor-Hour Contracts and Orders 2011-025 ...

  16. 7.0 - Integrated Acquisition Planning Process

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    .0 (August 2006) 1 INTEGRATING ACQUISITION PLANNING PROCESSES - AN OVERVIEW REFERENCES 1. FAR Part 7 Acquisition Planning 2. FAR Part 34 Major System Acquisition 3. Acquisition Letter 2005-08R, Small Business Programs 4. Acquisition Guide Chapter 7.1, Acquisition Planning 5. Acquisition Guide Chapter 42.5, Contract Management Planning 6. DOE O 580.1 Department of Energy Property Management Program 7. DOE O 413.3 Program and Project Management for the Acquisition of Capital Assets Guiding

  17. Acquisition and Project Management Continuous Improvement Presentation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Project Management Continuous Improvement Presentation Acquisition and Project Management Continuous Improvement Presentation Presentation on Acquisition and Project Management ...

  18. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OPAM Policy Acquisition Guides OPAM Policy Acquisition Guides Acquisition Guides OPAM Policy Acquisition Guides (48.87 KB) More Documents & Publications Chapter 15 - Contracting by Negotiation Revised DOE Acquisition Guide Chapter 15.4-2 Weighted Guidelines (July 201 0) Acquisition Letter No. AL 2009-01

  19. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1

    Office of Energy Efficiency and Renewable Energy (EERE)

    Acquisition Guide Chapter 7.1 is revised to remind the planner when planning for an interagency acquisition to perform a determination of best procurement approach, business case analysis and/or Economy Act determinations and findings, as applicable, in accordance with Federal Acquisition Regulation (FAR) 17.5 Interagency Acquisitions. Revisions to the guide chapter add to references FAR 17.5 and related guide chapter 17.1. Also, two revisions in the chapter are identified by vertical lines in the left margin on pages 11 and 14.

  20. Acquisition News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    all options). October 2, 2015 DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos Cincinnati - The U.S. Department of Energy (DOE)...

  1. Acquisition Savings Reporting Process Template

    Broader source: Energy.gov (indexed) [DOE]

    steps, then it is an Other Acquisition Savings process. 2 STEP 2 - Select Savings Methodology (In Order of Preference) Regardless if it is Strategic Sourcing or an Other...

  2. Deepwater seismic acquisition technology

    SciTech Connect (OSTI)

    Caldwell, J.

    1996-09-01

    Although truly new technology is not required for successful acquisition of seismic data in deep Gulf of Mexico waters, it is helpful to review some basic aspects of these seismic surveys. Additionally, such surveys are likely to see early use of some emerging new technology which can improve data quality. Because such items as depth imaging, borehole seismic, 4-D and marine 3-component recording were mentioned in the May 1996 issue of World Oil, they are not discussed again here. However, these technologies will also play some role in the deepwater seismic activities. What is covered in this paper are some new considerations for: (1) longer data records needed in deeper water, (2) some pros and cons of very long steamer use, and (3) two new commercial systems for quantifying data quality.

  3. "Data Acquisition Systems"

    SciTech Connect (OSTI)

    Unterweger, Michael; Costrell, Louis deceased

    2009-07-07

    This project involved support for Lou Costrell and myself in the development of IEEE and IEC standards for nuclear counting and data acquisition systems. Over the years, as a result of this support, Lou and I were able to attend standards meetings of IEEE and IEC, which led directly to the publication of many standards for NIM systems, FastBus and CAMAC. We also chaired several writing committees as well as ANSI N42 (Nuclear instrumentation), IEEE NIM (NIM standard), IEEE NID (NPSS nuclear instruments and detector) and IEC TC45 WG9 (Nuclear instrumentation). Through this support we were able to assure that the interests of the US and DOE were expressed and implemented in the various standards.

  4. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1

    Office of Energy Efficiency and Renewable Energy (EERE)

    Acquisition Guide Chapter 7.1 has been revised to remove the requirement of obtaining the Deputy Secretary's approval of any Acquisition Plan for a contract exceeding $100 million. (The requirement appeared in the BACKGROUND section under the paragraph "Review and Approval Levels.")

  5. Acquisition Guide Chapter 7.1 - Acquisition Planning | Department of Energy

    Office of Environmental Management (EM)

    7.1 - Acquisition Planning Acquisition Guide Chapter 7.1 - Acquisition Planning PF2009-22.pdf (320.29 KB) PF2009-22a - Attachment-Acquisition Guide Chapter 7.1 - Acquisition Planning (192.2 KB) More Documents & Publications Acquisition Guide Chapter 7.1 - Acquisition Planning Microsoft Word - AcqGuide7pt1.doc Acquisition Guide Chapter 7.1 - Acquisition Planning

  6. Acquisition Guide Chapter 7.3:Acquisition Planning in the M&O Environment

    Broader source: Energy.gov [DOE]

    Acquisition Letter 2013-03, Acquisition Planning Considerations for M&O Contracts, has been moved to the Acquisition Guide as chapter (7.3).

  7. Unique Hardware and Software Data Acquisition and Processing Solutions in a

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Small Engine Test Cell for Enhanced Kinetic Engine Modeling Accuracy | Department of Energy Hardware and Software Data Acquisition and Processing Solutions in a Small Engine Test Cell for Enhanced Kinetic Engine Modeling Accuracy Unique Hardware and Software Data Acquisition and Processing Solutions in a Small Engine Test Cell for Enhanced Kinetic Engine Modeling Accuracy Novel use of AVL data acquisition/processing units provides simultaneous real-time acquisition, processing, and storage

  8. Acquisitions___Communications.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisitions___Communications.pdf Acquisitions___Communications.pdf (2.09 MB) More Documents & Publications 7pt1AcquisitionPlanning.pdf 37pt.2PerformanceBasedServiceAcquisition.pdf Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning

  9. Acquisition Guide Chapter 17.1 - Interagency Acquisitions, Interagency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The revised chapter is attached with this flash. All other attachments from Policy Flash 2012-32 remain the same. PDF icon PF2012-49 AG 17.1- Interagency Acquisitions, Interagency ...

  10. Policy Flash 2013-30 Acquisition Letter on Acquisition Planning...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at jason.taylor@hq.doe....

  11. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Publications Policy Flash 2016-29 Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 Policy Flash ...

  12. Acquisition Guide Chapter 7.1 – Acquisition Planning

    Broader source: Energy.gov [DOE]

    Acquisition Guide Chapter 7.1 is revised to update references, reorganize content, delete M&O coverage (which will be moved to a separate Guide Chapter), and add a new "Alternate Approval Process".

  13. Policy Flash 2013-30 Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts

    Broader source: Energy.gov [DOE]

    Attached is Policy Flash 2013-30 Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts

  14. High resolution data acquisition

    DOE Patents [OSTI]

    Thornton, Glenn W.; Fuller, Kenneth R.

    1993-01-01

    A high resolution event interval timing system measures short time intervals such as occur in high energy physics or laser ranging. Timing is provided from a clock (38) pulse train (37) and analog circuitry (44) for generating a triangular wave (46) synchronously with the pulse train (37). The triangular wave (46) has an amplitude and slope functionally related to the time elapsed during each clock pulse in the train. A converter (18, 32) forms a first digital value of the amplitude and slope of the triangle wave at the start of the event interval and a second digital value of the amplitude and slope of the triangle wave at the end of the event interval. A counter (26) counts the clock pulse train (37) during the interval to form a gross event interval time. A computer (52) then combines the gross event interval time and the first and second digital values to output a high resolution value for the event interval.

  15. High resolution data acquisition

    DOE Patents [OSTI]

    Thornton, G.W.; Fuller, K.R.

    1993-04-06

    A high resolution event interval timing system measures short time intervals such as occur in high energy physics or laser ranging. Timing is provided from a clock, pulse train, and analog circuitry for generating a triangular wave synchronously with the pulse train (as seen in diagram on patent). The triangular wave has an amplitude and slope functionally related to the time elapsed during each clock pulse in the train. A converter forms a first digital value of the amplitude and slope of the triangle wave at the start of the event interval and a second digital value of the amplitude and slope of the triangle wave at the end of the event interval. A counter counts the clock pulse train during the interval to form a gross event interval time. A computer then combines the gross event interval time and the first and second digital values to output a high resolution value for the event interval.

  16. Acquisition Letter Archive listing | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Archive listing Acquisition Letter Archive listing Acquisition Letter Archive listing (161.94 KB) More Documents & Publications Microsoft Word - LibraryofPriorRulemakings.doc Acquisition Letters Remaining in Effect Policy Flash Archive Search File

  17. Microsoft Word - ACQUISITION LETTER.doc | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ACQUISITION LETTER.doc Microsoft Word - ACQUISITION LETTER.doc PDF icon Microsoft Word - ACQUISITION LETTER.doc More Documents & Publications ACQUISITION LETTER DEAR Part 933 OPAM ...

  18. Sustainable Acquisition | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    The U.S. Department of Energy's (DOE) Sustainable Acquisition Program serves to ensure the purchase of more sustainable products by working with DOE sites to help them integrate ...

  19. Acquisition Letters Remaining In Effect

    Office of Energy Efficiency and Renewable Energy (EERE)

    Acquisition Letter (AL) 2010-07 has been issued. It lists ALs currently in effect and the discontinued ALs along with the reason why the AL is no longer in effect.

  20. Acquisition Letters Remaining In Effect

    Office of Energy Efficiency and Renewable Energy (EERE)

    Acquisition Letter (AL) 2012-01 has been issued. It lists ALs currently in effect and the discontinued ALs, along with the reason why the AL is no longer in effect.

  1. Acquisition Letters | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    2005 June 22, 2012 Acquisition Letter No. AL 2012-09 Guidance for Fast-Track Cooperative Research And Development Agreement (CRADA) Programs at DOE Facilities. previous 1 2 next...

  2. Graphical user interface for image acquisition and processing

    DOE Patents [OSTI]

    Goldberg, Kenneth A.

    2002-01-01

    An event-driven GUI-based image acquisition interface for the IDL programming environment designed for CCD camera control and image acquisition directly into the IDL environment where image manipulation and data analysis can be performed, and a toolbox of real-time analysis applications. Running the image acquisition hardware directly from IDL removes the necessity of first saving images in one program and then importing the data into IDL for analysis in a second step. Bringing the data directly into IDL creates an opportunity for the implementation of IDL image processing and display functions in real-time. program allows control over the available charge coupled device (CCD) detector parameters, data acquisition, file saving and loading, and image manipulation and processing, all from within IDL. The program is built using IDL's widget libraries to control the on-screen display and user interface.

  3. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    22.02 KB) More Documents & Publications Acquisition, Use, and Disposal of Real Estate Chapter 17 - Special Contracting Methods Acquisition, Use, and Disposal of Real Estate

  4. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    31.72 KB) More Documents & Publications Acquisition Guide Chapter 19 Update Acquisition Letter: AL2005-08 Microsoft Word - al2004-03.doc

  5. Trans India Acquisition Corporation | Open Energy Information

    Open Energy Info (EERE)

    India Acquisition Corporation Jump to: navigation, search Name: Trans-India Acquisition Corporation Place: Delaware Sector: Solar Product: Blank check company to be merged with...

  6. Searchable Electronic Department of Energy Acquisition Regulation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Searchable Electronic Department of Energy Acquisition Regulation Searchable Electronic Department of Energy Acquisition Regulation Updated July 2, 2013. The EDEAR is current ...

  7. Department of Energy Acquisition Regulation (DEAR) Technical...

    Broader source: Energy.gov (indexed) [DOE]

    of Energy Acquisition Regulation (DEAR) Technical Amendment-Final Rule (172.78 KB) More Documents & Publications Department of Energy Acquisition Regulation (DEAR) Technical ...

  8. Perspective & Acquisition Fellows Program - David Klaus, Deputy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Perspective & Acquisition Fellows Program - David Klaus, Deputy Under Secretary for Management and Performance Perspective & Acquisition Fellows Program - David Klaus, Deputy Under ...

  9. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 30 - Cost Accounting Standards Administration Policy Flash 2015-05 - Acquisition Letter 2015-02 Acquisition Letter No. AL 2015-02

  10. Chapter 39 - Acquisition of Information Technology | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    39 - Acquisition of Information Technology Chapter 39 - Acquisition of Information Technology PDF icon 39.1AcquisitionofInformationResources0.pdf PDF icon ...

  11. Federal Acquisition Circular 2005-53

    Broader source: Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-53 which makes miscellaneous changes to the Federal Acquisition Regulation.

  12. Federal Acquisition Circular 2005-39

    Broader source: Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-39 which makes miscellaneous changes to the Federal Acquisition Regulation.

  13. Port Asset Acquisition LLC | Open Energy Information

    Open Energy Info (EERE)

    Acquisition LLC Jump to: navigation, search Name: Port Asset Acquisition LLC Place: Louisiana Product: PAA was formed to acquire a fuel terminal, tanks and land in Alexandria,...

  14. Acquisition Workforce Information | Department of Energy

    Office of Environmental Management (EM)

    All Acquisition Workforce information has been moved to Powerpedia - Acquisition Workforce. Aviation Management Green Leases Executive Secretariat Energy Reduction at HQ Real ...

  15. In situ acquisition of cathodic protection parameters

    SciTech Connect (OSTI)

    Baptista, W.; Costa, J.C.M. da

    1997-01-01

    Present, offshore cathodic protection (CP) design in Brazil uses parameters found in the literature and in international norms, such as: initial and average current density, coating efficiency, leaked current at the buried part of the wet Xmas tree, etc. Five data acquisition systems (DAS) were launched at the Campos Basin water in depths of 102, 290, and 975 m. The DASs were recovered after 8, 11, and 14 months, respectively. Adequate methods of data processing guaranteed the acquisition of reliable parameters for use in CP projects in seawater: initial and average current densities, anode current capacity, and polarization curves at several time intervals. The potential of {minus}800 mV{sub Ag/AgCl} is generally accepted as norm for carbon steel protection in seawater. The cathodic current density necessary to obtain this potential is extremely dependent upon environmental conditions, and the geometry and superficial condition of the submerged steel structure.

  16. acquisition | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    acquisition Small Business Sourcing System NNSA is implementing a system housing small businesses that have participated in our Opportunity Sessions, and have completed the NNSA Capabilities Questionnaire.Information is gathered relevant to the performance of each small business and included in the system. Among the information... Procurement The NNSA's Office of Acquisition & Project Management (APM) offers an 18-36 month procurement forecast that uses information obtained through the NNSA

  17. Acquisition News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition News Acquisition News RSS August 4, 2016 DOE-SR Exercises Option on Management and Operating Contract The Department of Energy (DOE), Savannah River Operations Office, will exercise an option to extend the term of the current management and operating contract with Savannah River Nuclear Solutions (SRNS) for an additional 22 months, from Oct. 1, 2016 to July 31, 2018. August 2, 2016 DOE Issues Final Request for Proposals for the West Valley Demonstration Project Supplemental

  18. Acquisition Savings Reporting Template Guidance

    Broader source: Energy.gov [DOE]

    As part of the Office of Management and Budget (OMB) Acquisition Savings Initiative and the DOE Strategic Sourcing Program, a key challenge has been to address the requirements of reporting cost savings and cost avoidance data. In order for DOE to fully comply with reporting requirements, we are directing that the attached template be utilized for reporting acquisition savings/cost avoidance data effective as of October 1, 2012.

  19. Acquisition Guide Chapter 17.1 – Interagency Acquisitions, Interagency Transactions, and Interagency Agreements

    Broader source: Energy.gov [DOE]

    Acquisition Guide Chapter 17.1 – Interagency Acquisitions, Interagency transactions, and Interagency Agreements is revised to incorporate (1) Federal Acquisition Circular (FAC) changes to Federal Acquisition Regulation (FAR) Part 17.5 – Interagency Acquisitions, Office of Federal Procurement Policy (OFPP) guidance for business case analysis for certain multi-agency and agency-specific contracts, (2) Acquisition Letter 2011-03, and (3) update the current guide chapter 17.1. Acquisition Letter (AL) 2011-03 is hereby rescinded.

  20. DAQMAN - A flexible configurable data acquisition system

    Energy Science and Technology Software Center (OSTI)

    2012-08-01

    DAQMAN is a flexible configurable interface that allows the user to build and operate a VME-based data acquisition system on a Linux workstation. It consists of two parts: a Java-based Graphical User Interface to configure the system, and a C-based utility that reads out the data and creates the output ASCII data file, with two levels of diagnostic tools. The data acquisition system requires a CAEN CONET-VME Bridge to communicate between the hardware in themore » VME crate and the Linux workstation. Data acquisition modules, such as ADCs, TDC, Scalers, can be loaded into the system, or removed easily. The GUI allows users to activate modules, and channels within modules by clicking on icons. Running configurations are stored; data are collected and can be viewed either as raw numbers, or by charts and histograms that update as the data are accumulated. Data files are written to disk in ASCII format, with a date and time stamp.« less

  1. Acquisition and Project Management Continuous Improvement Presentation |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy and Project Management Continuous Improvement Presentation Acquisition and Project Management Continuous Improvement Presentation Presentation on Acquisition and Project Management Continuous Improvement. Acquisition and Project Management Continuous Improvement presentation (1.43 MB) More Documents & Publications Occupational Safety Performance Voluntary Protection Program Onsite Review, Safeguards and Security - August 2012 Report on Acquisition and Project

  2. FAR Acquisition Strategy Team | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FAR Acquisition Strategy Team FAR Acquisition Strategy Team FAR Acquisition Strategy Team (184.09 KB) More Documents & Publications FAR Acquisition Strategy Team Microsoft Word - Section 311 AL FAL Feb 17 2010 Congressional Notification of Pending Contract or Financial Assistance Actions In excess of $1 Million under the Continuing Resolution

  3. Acquisition Forecast Download | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Forecast Download Acquisition Forecast Download Click on the link to download a copy of the DOE HQ Acquisition Forecast. Acquisition-Forecast-2016-07-20.xlsx (72.85 KB) More Documents & Publications Small Business Program Manager Directory EA-1900: Notice of Availability of a Draft Environmental Assessment Assessment Report: OAS-V-15-01

  4. Acquisition Workforce Information | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Certifications and Professional Development » Acquisition Workforce Information Acquisition Workforce Information All Acquisition Workforce information has been moved to Powerpedia - Acquisition Workforce. Aviation Management Green Leases Executive Secretariat Energy Reduction at HQ Real Estate Approvals Documents and Publications Facilities and Infrastructure Federal Advisory Committee Management Freedom of Information Act Financial Assistance Information Systems Property Procurement and

  5. Advances in rapid prototyping

    SciTech Connect (OSTI)

    Atwood, C.L.; McCarty, G.D.; Pardo, B.T.; Bryce, E.A.

    1993-12-31

    Recent advances in stereolithography and selective laser sintering have had a significant impact on the overall quality of parts produced using these rapid prototyping processes. The development and implementation of 3D System`s QuickCast{trademark} resin and software for building investment casting patterns have proven to be major steps toward fabricating highly accurate patterns with very good surface finishes. Sandia uses patterns generated from rapid prototyping processes to reduce the cycle time and cost of fabricating prototype parts in support of a Sandia National Laboratories managed program called FASTCAST. As participants in the Beta test program for QuickCast{trademark} resin and software, they experienced a steep learning curve and were able to build accurate parts in a short period of time. It is now possible, using this technology, to produce highly accurate prototype parts as well as acceptable firs article and small lots size production parts. They use the Selective Laser Sintering (SLS) process to fabricate prototype wax patterns for investment casting. DTM Corporation recently introduced the use of their polycarbonate material for fabricating investment casting patterns. The polycarbonate material is processed significantly faster, with improved strength, dimensional stability, and without a support structure during the build process. Sandia is currently changing from investment casting wax to polycarbonate for the fabrication of investment casting patterns using the SLS process. This presentation will focus on the successes with these new materials from the standpoints of application, accuracy, surface finish, and post processing. Also presented will be examples of parts manufactured by these processes.

  6. The acquisition of dangerous biological materials :

    SciTech Connect (OSTI)

    Aceto, Donato Gonzalo; Astuto-Gribble, Lisa M.; Gaudioso, Jennifer M.

    2007-11-01

    Numerous terrorist organizations have openly expressed interest in producing and deploying biological weapons. However, a limiting factor for many terrorists has been the acquisition of dangerous biological agents, as evidenced by the very few successful instances of biological weapons use compared to the number of documented hoaxes. Biological agents vary greatly in their ability to cause loss of life and economic damage. Some agents, if released properly, can kill many people and cause an extensive number of secondary infections; other agents will sicken only a small number of people for a short period of time. Consequently, several biological agents can potentially be used to perpetrate a bioterrorism attack but few are likely capable of causing a high consequence event. It is crucial, from a US national security perspective, to more deeply understand the likelihood that terrorist organizations can acquire the range of these agents. Few studies have attempted to comprehensively compile the technical information directly relevant to the acquisition of dangerous bacteria, viruses and toxins. In this report, technical fact sheets were assembled for 46 potentially dangerous biological agents. Much of the information was taken from various research sources which could ultimately and significantly expedite and improve bioterrorism threat assessments. By systematically examining a number of specific agent characteristics included in these fact sheets, it may be possible to detect, target, and implement measures to thwart future terrorist acquisition attempts. In addition, the information in these fact sheets may be used as a tool to help laboratories gain a rudimentary understanding of how attractive a method laboratory theft is relative to other potential acquisition modes.

  7. Acquisition and Assistance | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Acquisition Forecast Acquisition Forecast Acquisition Forecast It is the policy of the U.S. Department of Energy (DOE) to provide timely information to the public regarding DOE's forecast of future prime contracting opportunities and subcontracting opportunities which are available via the Department's major site and facilities management contractors. This forecast has been expanded to also provide timely status information for ongoing prime contracting actions that are valued in excess of the

  8. Rapid Swept-Wavelength External Cavity Quantum Cascade Laser for Open Path Sensing

    SciTech Connect (OSTI)

    Brumfield, Brian E.; Phillips, Mark C.

    2015-07-01

    A rapidly tunable external cavity quantum cascade laser system is used for open path sensing. The system permits acquisition of transient absorption spectra over a 125 cm-1 tuning range in less than 0.01 s.

  9. Secure Video Surveillance System Acquisition Software

    Energy Science and Technology Software Center (OSTI)

    2009-12-04

    The SVSS Acquisition Software collects and displays video images from two cameras through a VPN, and store the images onto a collection controller. The software is configured to allow a user to enter a time window to display up to 2 1/2, hours of video review. The software collects images from the cameras at a rate of 1 image per second and automatically deletes images older than 3 hours. The software code operates in amore » linux environment and can be run in a virtual machine on Windows XP. The Sandia software integrates the different COTS software together to build the video review system.« less

  10. Biomass Rapid Analysis Network (BRAN)

    SciTech Connect (OSTI)

    Not Available

    2003-10-01

    Helping the emerging biotechnology industry develop new tools and methods for real-time analysis of biomass feedstocks, process intermediates and The Biomass Rapid Analysis Network is designed to fast track the development of modern tools and methods for biomass analysis to accelerate the development of the emerging industry. The network will be led by industry and organized and coordinated through the National Renewable Energy Lab. The network will provide training and other activities of interest to BRAN members. BRAN members will share the cost and work of rapid analysis method development, validate the new methods, and work together to develop the training for the future biomass conversion workforce.

  11. Rapid response sensor for analyzing Special Nuclear Material

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Mitra, S. S.; Doron, O.; Chen, A. X.; Antolak, A. J.

    2015-06-18

    Rapid in-situ analytical techniques are attractive for characterizing Special Nuclear Material (SNM). Present techniques are time consuming, and require sample dissolution. Proof-of-principal studies are performed to demonstrate the utility of employing low energy neutrons from a portable pulsed neutron generator for non-destructive isotopic analysis of nuclear material. In particular, time-sequenced data acquisition, operating synchronously with the pulsing of a neutron generator, partitions the characteristic elemental prompt gamma-rays according to the type of the reaction; inelastic neutron scattering reactions during the ON state and thermal neutron capture reactions during the OFF state of the generator. Thus, the key challenge is isolatingmore » these signature gamma- rays from the prompt fission and β-delayed gamma-rays that are also produced during the neutron interrogation. A commercial digital multi-channel analyzer has been specially customized to enable time-resolved gamma-ray spectral data to be acquired in multiple user-defined time bins within each of the ON/OFF gate periods of the neutron generator. Preliminary results on new signatures from depleted uranium as well as modeling and benchmarking of the concept are presented, however this approach should should be applicable for virtually all forms of SNM.« less

  12. Rapid response sensor for analyzing Special Nuclear Material

    SciTech Connect (OSTI)

    Mitra, S. S.; Doron, O.; Chen, A. X.; Antolak, A. J.

    2015-06-18

    Rapid in-situ analytical techniques are attractive for characterizing Special Nuclear Material (SNM). Present techniques are time consuming, and require sample dissolution. Proof-of-principal studies are performed to demonstrate the utility of employing low energy neutrons from a portable pulsed neutron generator for non-destructive isotopic analysis of nuclear material. In particular, time-sequenced data acquisition, operating synchronously with the pulsing of a neutron generator, partitions the characteristic elemental prompt gamma-rays according to the type of the reaction; inelastic neutron scattering reactions during the ON state and thermal neutron capture reactions during the OFF state of the generator. Thus, the key challenge is isolating these signature gamma- rays from the prompt fission and β-delayed gamma-rays that are also produced during the neutron interrogation. A commercial digital multi-channel analyzer has been specially customized to enable time-resolved gamma-ray spectral data to be acquired in multiple user-defined time bins within each of the ON/OFF gate periods of the neutron generator. Preliminary results on new signatures from depleted uranium as well as modeling and benchmarking of the concept are presented, however this approach should should be applicable for virtually all forms of SNM.

  13. Acquisition Guide Chapter 19 Update

    Office of Energy Efficiency and Renewable Energy (EERE)

    Acquisition Guide Chapter 19, concerning small business considerations for DOE contracts, has been updated. The update includes changes in federal procurement policy made by P.L. 111-240, Small Business Jobs Act of 2010, and changes in reporting thresholds for awards issued on or after October 1, 2010.

  14. DOE Acquisition Guide Chapter 23

    Broader source: Energy.gov [DOE]

    The purpose of this flash is to provide you an updated copy of the DOE Acquisition Guide Chapter 23. The Chapter has been updated to reflect the more recent requirements of Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance which updates Executive Order 13423.

  15. Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts

    Office of Energy Efficiency and Renewable Energy (EERE)

    The attached Acquisition Letter is issued to provide updated guidance on the unique acquisition planning procedures associated with management and operating (M%26O) contracts. Acquisition Letter 2009-3 is cancelled.

  16. Updated NGNP Fuel Acquisition Strategy

    SciTech Connect (OSTI)

    David Petti; Tim Abram; Richard Hobbins; Jim Kendall

    2010-12-01

    A Next Generation Nuclear Plant (NGNP) fuel acquisition strategy was first established in 2007. In that report, a detailed technical assessment of potential fuel vendors for the first core of NGNP was conducted by an independent group of international experts based on input from the three major reactor vendor teams. Part of the assessment included an evaluation of the credibility of each option, along with a cost and schedule to implement each strategy compared with the schedule and throughput needs of the NGNP project. While credible options were identified based on the conditions in place at the time, many changes in the assumptions underlying the strategy and in externalities that have occurred in the interim requiring that the options be re-evaluated. This document presents an update to that strategy based on current capabilities for fuel fabrication as well as fuel performance and qualification testing worldwide. In light of the recent Pebble Bed Modular Reactor (PBMR) project closure, the Advanced Gas Reactor (AGR) fuel development and qualification program needs to support both pebble and prismatic options under the NGNP project. A number of assumptions were established that formed a context for the evaluation. Of these, the most important are: • Based on logistics associated with the on-going engineering design activities, vendor teams would start preliminary design in October 2012 and complete in May 2014. A decision on reactor type will be made following preliminary design, with the decision process assumed to be completed in January 2015. Thus, no fuel decision (pebble or prismatic) will be made in the near term. • Activities necessary for both pebble and prismatic fuel qualification will be conducted in parallel until a fuel form selection is made. As such, process development, fuel fabrication, irradiation, and testing for pebble and prismatic options should not negatively influence each other during the period prior to a decision on reactor type

  17. Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate

    Broader source: Energy.gov [DOE]

    The Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate, is updated to include the involvement of Certified Realty Specialist.

  18. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1

    Broader source: Energy.gov [DOE]

    Acquisition Guide Chapter 7.1 is revised to update references to DOE orders from 413.3A to 413.3B and 430.2A to 436.1 and DOE manual 413.3-1 to DOE Guide 413.3-13. Revisions to references for the DOE orders and DOE Guide are identified by vertical lines in the left margin.

  19. Class Deviation by General Services Administration (GSA) to Federal Acquisition Regulation (FAR) 51.1, Contractor Use of Government Supply Sources, for Time and Material or Labor Hour Procurements

    Office of Energy Efficiency and Renewable Energy (EERE)

    The attached GSA class deviation to FAR Part 51, Contractor Use of Government Supply Sources, dated October 8,2009, permits contracting officers to authorize all GSA contractors, who are performing an order on a time and material (T&M) or labor-hour (LH) basis, to purchase supplies and service from other schedule contractors or process requisitions through the GSA Supply Program. This deviation is effective for five years to October 7,2014, unless otherwise revised or rescinded.

  20. Chapter 13 - Simplified Acquisition Procedures | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 - Simplified Acquisition Procedures Chapter 13 - Simplified Acquisition Procedures 13.1 - Purchase Card Policy and Operating Procedures PDF icon 13.2PurchaseOrders0.pdf PDF...

  1. Chapter 39 - Acquisition of Information Technology | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 - Acquisition of Information Technology Chapter 39 - Acquisition of Information Technology PDF icon 39.1AcquisitionofInformationResources0.pdf PDF icon 39.2GuidanceonElec...

  2. Chapter 18 - Emergency Acquisitions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon 18.0EmergencyAcquisitions0.pdf More Documents & Publications Acqguide18pt0 March 2011 final OPAM Policy Acquisition Guides Microsoft Word - acqguide18pt0 Nov 2010...

  3. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    35.9 KB) More Documents & Publications Revision to Acquisition Guide Chapter 33.1, Protests Chapter 33 - Protests, Disputes and Appeals Acquisition Guide Chapter 1.2 - Attachment - Non-Delegable HCA Functions and Responsibilities

  4. Federal Acquisition Circular 2005-37

    Office of Energy Efficiency and Renewable Energy (EERE)

    Federal Acquisition Circular 2005-37, which makes miscellaneous changes to the Federal Acquisition Regulation, was published in the October 14,2009, issue of the Federal Register. A summary of the changes is attached.

  5. Update to Congressional Notifications - Acquisition Guide Chapter...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Since we previously notified you in Policy Flash 2012-44 for Congressional notifications, ... Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Policy Flash 2016-29 DOE F ...

  6. Federal Acquisition Circular 2005-58

    Broader source: Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-58 which makes miscellaneous changes to the Federal Acquisition Regulation. The Circular was published in the Federal Register on April 18, 2012 at 77 FR 23363.

  7. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Guide Chapter 1.0 - Acquisition Regulations System Acquisition Guide Chapter 1.2 - Attachment - Non-Delegable HCA Functions and Responsibilities Microsoft Word - AcqGuide71pt1.doc

  8. Intellectual Property (IP) Service Providers for Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Intellectual Property Provides ACQ and Assistance More Documents & Publications Intellectual Property (IP) Service Providers for Acquisition and Assistance Transactions Microsoft ...

  9. Intellectual Property (IP) Service Providers for Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOEIPCounselforDOELaboratories 2015 More Documents & Publications Intellectual Property (IP) Service Providers for Acquisition and Assistance Transactions ...

  10. Department of Energy Acquisition Regulation (DEAR) Technical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Amendment-Final Rule | Department of Energy Technical Amendment-Final Rule Department of Energy Acquisition Regulation (DEAR) Technical Amendment-Final Rule PF2009-66.pdf (171.29 KB) PF2009-66a - Attachment-Department of Energy Acquisition Regulation (DEAR) Technical Amendment-Final Rule (172.78 KB) More Documents & Publications Department of Energy Acquisition Regulation (DEAR) Technical Amendment-Final Rule Department of Energy Acquisition Regulation (DEAR) Final Rule for Subchapters

  11. Acquisition, Use, and Disposal of Real Estate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 17.3 (March 2011) 1 Acquisition, Use, and Disposal of Real Estate References DEAR 917.74 - Acquisition, Use, and Disposal of Real Estate DOE Directives DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets, or current version DOE Order 430.1B, Real Property Asset Management, or current version Overview This section provides internal Departmental information and DOE and NNSA points of contact for issues dealing with real estate acquisition, use, and

  12. Site Acquisition Description/ Category Contracting Office Solicitation

    Office of Environmental Management (EM)

    ------------------------- Chapter 13.3 (March 2014) 1 [Reference: FAR Subpart 13. 3 and FAR Subpart 13.5] Simplified Acquisition Procedures 1. Introduction Simplified Acquisition Procedures (SAP) are contracting methods designed to streamline the acquisition process and facilitate the procurement of goods and services. The results include less paperwork and lower costs for both the contractor and the Government. FAR 13.003(a) states, "Agencies shall use simplified acquisition procedures to

  13. Acquisition Certifications Handbook 4th edition released

    Broader source: Energy.gov [DOE]

    The Acquisition Certifications Program Handbook 4th Edition is released with latest content related to Realty Specialist chapter.

  14. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    18 - Emergency Acquisitions Acqguide18pt0 March 2011 final Microsoft Word - acqguide18pt0 Nov 2010...

  15. Acquisition Career Management Program Handbook, Partial Revision...

    Broader source: Energy.gov (indexed) [DOE]

    Procurement and Assistance Management SUBJECT: Acquisition Career Management Program Handbook, Partial Revision of Chapter 11, Contracting Officer's Representative SUMMARY: The...

  16. Acquisition and the Environment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition » Guidance » Acquisition and the Environment Acquisition and the Environment The information provide on these pages are meant to be resource and tool for the DOE acquisition community. Please share suggestions for its further development and improvement. Provide your comments to Richard Langston at (202) 287-1339, or e-mail them to richard.langston@hq.doe.gov GREEN PURCHASING OVERVIEW The White House Task Force on Recycling along with the US Army Center for Health Promotion and

  17. Federal Acquisition Circular 2005-52

    Broader source: Energy.gov [DOE]

    Attached for your information is a summary of rules incorporated in the FAR by Federal Acquisition Circular 2005-52.

  18. Procurement and Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Procurement and Acquisition Doing Business With the U.S. Department of Energy Welcome to the Department of Energy's Acquisition homepage. The Office of Acquisition Management (OAM) is responsible for all contracting, financial assistance and related activities to fulfill the Department's multitude of missions through its business relationships. As the business organization of the Department, OAM develops and supports the policies, procedures and procurement operational elements. OAM

  19. Acquisition and Project Management | National Nuclear Security...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Human Resources Acquisition Management Technical, Engineering, and Programmatic Support (TEPS) Blanket Purchase Agreements (BPAs) Environmental Program Services Contract ...

  20. acquisition

    National Nuclear Security Administration (NNSA)

    0%2A en Small Business http:nnsa.energy.govaboutusouroperationsapmsmallbusiness

    Page...

  1. Jefferson Lab's Distributed Data Acquisition

    SciTech Connect (OSTI)

    Trent Allison; Thomas Powers

    2006-05-01

    Jefferson Lab's Continuous Electron Beam Accelerator Facility (CEBAF) occasionally experiences fast intermittent beam instabilities that are difficult to isolate and result in downtime. The Distributed Data Acquisition (Dist DAQ) system is being developed to detect and quickly locate such instabilities. It will consist of multiple Ethernet based data acquisition chassis distributed throughout the seven-eights of a mile CEBAF site. Each chassis will monitor various control system signals that are only available locally and/or monitored by systems with small bandwidths that cannot identify fast transients. The chassis will collect data at rates up to 40 Msps in circular buffers that can be frozen and unrolled after an event trigger. These triggers will be derived from signals such as periodic timers or accelerator faults and be distributed via a custom fiber optic event trigger network. This triggering scheme will allow all the data acquisition chassis to be triggered simultaneously and provide a snapshot of relevant CEBAF control signals. The data will then be automatically analyzed for frequency content and transients to determine if and where instabilities exist.

  2. Department of Energy Acquisition Letter 2013-04 on Executive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Letter 2013-04 on Executive Compensation Department of Energy Acquisition Letter 2013-04 on Executive Compensation Department of Energy Acquisition Letter 2013-04 ...

  3. ACQUISITION LETTER DEAR Part 933 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    sections 601-613. PDF icon ACQUISITION LETTER More Documents & Publications Microsoft Word - ACQUISITION LETTER.doc OPAM Policy Acquisition Guides Chapter 33 - Protests,...

  4. ADR Provisions in Federal Acquisition Regulation (FAR) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulation (FAR) More Documents & Publications Microsoft Word - ADR-Provisions-FederalAcquisitionReg.doc ACQUISITION LETTER DEAR Part 933 Microsoft Word - ACQUISITION LETTER.doc...

  5. 2015 DOE Acquisition and Project Management (APM) Workshop |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 DOE Acquisition and Project Management (APM) Workshop 2015 DOE Acquisition and Project Management (APM) Workshop Workshop Details: What: 2015 DOE Acquisition and Project...

  6. New Mexico Dry Natural Gas Reserves Acquisitions (Billion Cubic...

    Gasoline and Diesel Fuel Update (EIA)

    Acquisitions (Billion Cubic Feet) New Mexico Dry Natural Gas Reserves Acquisitions ... Referring Pages: Dry Natural Gas Reserves Acquisitions New Mexico Dry Natural Gas Proved ...

  7. New York Dry Natural Gas Reserves Acquisitions (Billion Cubic...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Acquisitions (Billion Cubic Feet) New York Dry Natural Gas Reserves Acquisitions (Billion ... Referring Pages: Dry Natural Gas Reserves Acquisitions New York Dry Natural Gas Proved ...

  8. Federal Acquisition Circular 2005-52 Item Subject FAR...

    Office of Environmental Management (EM)

    Federal Acquisition Circular 2005-52 Item Subject FAR case I Sustainable Acquisition ... VI Technical Amendments NA Item I--Sustainable Acquisition (FAR Case 2010-001) ...

  9. "Paper" Energy Systems Acquisition Advisory Board Process | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "Paper" Energy Systems Acquisition Advisory Board Process "Paper" Energy Systems Acquisition Advisory Board Process Memo on "Paper" Energy Systems Acquisition Advisory Board ...

  10. Virginia Dry Natural Gas Reserves Acquisitions (Billion Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Acquisitions (Billion Cubic Feet) Virginia Dry Natural Gas Reserves Acquisitions (Billion ... Referring Pages: Dry Natural Gas Reserves Acquisitions Virginia Dry Natural Gas Proved ...

  11. North Dakota Dry Natural Gas Reserves Acquisitions (Billion Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Acquisitions (Billion Cubic Feet) North Dakota Dry Natural Gas Reserves Acquisitions ... Referring Pages: Dry Natural Gas Reserves Acquisitions North Dakota Dry Natural Gas Proved ...

  12. National Geothermal Data Systems Data Acquisition and Access...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems Data Acquisition and Access National Geothermal Data Systems Data Acquisition and Access Project objective: To support the acquisition of new and legacy data from ...

  13. Transient data acquisition techniques under EDS

    SciTech Connect (OSTI)

    Telford, S.

    1985-06-01

    This paper is the first of a series which describes the Enrichment Diagnostic System (EDS) developed for the MARS project at Lawrence Livermore National Laboratory. Although EDS was developed for use on AVLIS, the functional requirements, overall design, and specific techniques are applicable to any experimental data acquisition system involving large quantities of transient data. In particular this paper will discuss the techniques and equipment used to do the data acquisition. Included are what types of hardware are used and how that hardware (CAMAC, digital oscilloscopes) is interfaced to the HP computers. In this discussion the author will address the problems encountered and the solutions used, as well as the performance of the instrument/computer interfaces. The second topic the author will discuss is how the acquired data is associated to graphics and analysis portions of EDS through efficient real time data bases. This discussion will include how the acquired data is folded into the overall structure of EDS providing the user immediate access to raw and analyzed data. By example you will see how easily a new diagnostic can be added to the EDS structure without modifying the other parts of the system. 8 figs.

  14. Acquisition Guide Chapter 71.3, Data Reporting- Quality Management

    Broader source: Energy.gov [DOE]

    Attached is new Acquisition Guide Chapter 71.3, Data Reporting - Quality Management. This Guide Chapter summarizes responsibilities for ensuring that the reporting of Federal and Departmental procurement and financial assistance data are timely, accurate and current. The Guide Chapter will be updated appropriately as additional Government-wide guidance is issued.

  15. Exotherm data acquisition in polyurethane foam formation using a microcomputer

    SciTech Connect (OSTI)

    Hebrard, M.J.; Leroux, J.

    1986-01-01

    An Apple microcomputer was used to collect exotherm data of the reactions leading to the formation of polyurethane foams, to differentiate the curves with respect to time and to measure the position and magnitude of the inflection points. Hardware, software, operations and reproducibility of this automated data acquisition system are described.

  16. Control And Data Acquisition System Of Tokamak KTM

    SciTech Connect (OSTI)

    Baystrukov, K. I.; Pavlov, V. M.; Sharnin, A. V.; Obhodskij, A. V.; Merkulov, S. V.; Golobokov, Y. N.; Mezentsev, A. A.; Ovchinnikov, A. V.; Tazhibaeva, I. L.

    2008-04-07

    The preliminary results of control and data acquisition system (CODAS) development for Kazakhstan tokamak for material testing (KTM) [1] are presented. The KTM CODAS is completely new system optimized for KTM facility and its regimes of operation. Its development is carrying out in Tomsk Polytechnic University by Russian specialists. The first KTM launching under the control of CODAS is planed on 2008 year. The base functionality of CODAS is presented, including short description of its subsystems, such as control system of conditioning process, plasma control system, digital control system of power supplies, protection and timing system, data acquisition system.

  17. Acquisition Guide, Chapters 42.15, Contractor Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE)

    The subject Acquisition Guide Chapter has been updated to incorporate Federal Acquisition Regulation (FAR) changes published in Federal Acquisition Circular 2005-69. The FAR has Table 42-1 Evaluation Ratings Definitions and Table 42-2 Evaluation Ratings and Definitions for the Small Business Subcontracting Evaluation Factor, when 52.219-9 is used in a contract; therefore, Attachment A, Ratings and Narratives is deleted from this chapter. Other revisions include adding in Section II that evaluations shall be prepared at least annually and at the time the work under a contract or order is completed. In Section IV, it reminds the contracting officer of FAR 17.207 - Exercise of options, to consider the contractor's past performance on other contract actions, as well as, the contractor's performance on the current contract to have acceptable ratings.

  18. AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT Acquisition Letters (AL)...

  19. Acquisition, Use, and Disposal of Real Estate | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition, Use, and Disposal of Real Estate Acquisition, Use, and Disposal of Real Estate Acquisition, Use, and Disposal of Real Estate (76.66 KB) More Documents & Publications OPAM Policy Acquisition Guides Chapter 17 - Special Contracting Methods Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate

  20. Acquisition, Use, and Disposal of Real Estate | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition, Use, and Disposal of Real Estate Acquisition, Use, and Disposal of Real Estate More Documents & Publications Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate OPAM Policy Acquisition Guides Acquisition, Use, and Disposal of Real Estate

  1. Proceedings of the workshop on triggering and data acquisition for experiments at the Supercollider

    SciTech Connect (OSTI)

    Donaldson, R.

    1989-04-01

    This meeting covered the following subjects: triggering requirements for SSC physics; CDF level 3 trigger; D0 trigger design; AMY trigger systems; Zeus calorimeter first level trigger; data acquisition for the Zeus Central Tracking Detector; trigger and data acquisition aspects for SSC tracking; data acquisition systems for the SSC; validating triggers in CDF level 3; optical data transmission at SSC; time measurement system at SSC; SSC/BCD data acquisition system; microprocessors and other processors for triggering and filtering at the SSC; data acquisition, event building, and on-line processing; LAA real-time benchmarks; object-oriented system building at SSC; and software and project management. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

  2. Notices Rapides Parish Rapides Parish Library, 411 Washington...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notices Rapides Parish Rapides Parish Library, 411 Washington St., Alexandria, 15001005 ... (NPS), has made available for public review and comment the Draft Environmental ...

  3. Rapid road repair vehicle

    DOE Patents [OSTI]

    Mara, Leo M.

    1999-01-01

    Disclosed are improvments to a rapid road repair vehicle comprising an improved cleaning device arrangement, two dispensing arrays for filling defects more rapidly and efficiently, an array of pre-heaters to heat the road way surface in order to help the repair material better bond to the repaired surface, a means for detecting, measuring, and computing the number, location and volume of each of the detected surface imperfection, and a computer means schema for controlling the operation of the plurality of vehicle subsystems. The improved vehicle is, therefore, better able to perform its intended function of filling surface imperfections while moving over those surfaces at near normal traffic speeds.

  4. Department of Energy (DOE) Acquisition Guide

    Broader source: Energy.gov [DOE]

    Regulatory requirements for the acquisition process are set forth in the Federal Acquisition Regulation (FAR) and are supplemented in the Department of Energy Acquisition Regulation (DEAR). FAR 1.301 provides for the issuance of additional internal agency guidance, including designations and delegations of authority, assignments of responsibilities, work-flow procedures, and internal reporting requirements. The DOE Acquisition Guide serves this purpose by identifying relevant internal standard operating procedures to be followed by both procurement and program personnel who are involved in various aspects of the acquisition process. The Guide also is intended to be a repository of best practices found throughout the agency that reflect specific illustrations of techniques which ' might be helpful to all readers. Additionally, the Guide includes subject matter that was issued previously through other media, such as Acquisition Letters.

  5. Searchable Electronic Department of Energy Acquisition Regulation |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Searchable Electronic Department of Energy Acquisition Regulation Searchable Electronic Department of Energy Acquisition Regulation Updated July 2, 2013. The EDEAR is current through the Final Rule published May 3, 2013 at 78 FR 25817 If you have any questions concerning this page, please contact Barbara Binney in the Contract and Financial Assistance Policy Division, Office of Acquisition and Project Management. EDEAR July 2 2013 final.pdf (3.36 MB) More Documents &

  6. Characterization of a Swept External Cavity Quantum Cascade Laser For Rapid Broadband Spectroscopy and Sensing

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Brumfield, Brian E.; Taubman, Matthew S.; Suter, Jonathan D.; Phillips, Mark C.

    2015-09-17

    The performance of a rapidly swept external cavity quantum cascade laser (ECQCL) system combined with an open-path Herriott cell was evaluated for time-resolved measurements of chemical species with broad and narrow absorption spectra. A spectral window spanning 1278 1390 cm-1 was acquired at a 200 Hz acquisition rate, corresponding to a tuning rate of 2x104 cm-1/s, with a spectral resolution of 0.2 cm-1. The capability of the ECQCL to measure morethe ECQCL system exhibited noise-equivalent absorption coefficients of 5x10-9 cm-1Hz-1/2. For a spectrum acquisition time of 5 ms, noise-equivalent concentrations (NEC) for N2O and F134A were measured to be 70 and 16 ppbv respectively, which improved to sub-ppbv levels with averaging to 100 s. Noise equivalent column densities of 0.64 and 0.25 in 1 sec are estimated for N2O and F134A.less

  7. Alternative Financing - New Acquisition Guide Subchapter | Department...

    Broader source: Energy.gov (indexed) [DOE]

    policy flash Alternative Financing - New Acquisition Guide Subchapter More Documents & Publications Policy Flash 2010-83 Policy Flash 2012-30 Flash2011-77 OPAM...

  8. BCDA - Beamline Controls and Data Acquisition Group

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    * Data Acquisition * ebrick * Hardware * Software * Group Info * Sector Contacts * Knowledge Base * Meetings * Mailing list * APS PV Information * EPICS Naming Convention Print...

  9. Data Acquisition-Manipulation | Open Energy Information

    Open Energy Info (EERE)

    signals and numeric values that can be stored and manipulated in a useful manner by a computer program. Other definitions:Wikipedia Reegle Introduction Data acquisition and...

  10. Federal Information Technology Acquisition Reform Act (FITARA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Information Technology Acquisition Reform Act (FITARA) Data Resources FITARA Resources Available for Download: DOE IT Policy Archive: ZIP IT Leadership Directory: HTML | ...

  11. Acquisition Letter No. AL 2015-02

    Broader source: Energy.gov [DOE]

    The purpose of Acquisition Letter is to communicate the revisions to Chapter VII, Risk Management and Insurance Programs of DOE Order 350.1...

  12. Chapter 7 - Acquisition Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sourcing Requirements - Update May 2014 PDF icon 7.3 - Acuqisition Planning in the M&O Environment More Documents & Publications Policy Flash 2015-13 ACQUISITION PLANNING ...

  13. Positron emission mammography with tomographic acquisition using...

    Office of Scientific and Technical Information (OSTI)

    The most appropriate acquisition method for specific detection or quantitation tasks requires additionalmore investigation. less Authors: Mark F Smith ; Raymond R Raylman ; ...

  14. Acquisition, Use, and Disposal of Real Estate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition of Capital Assets, or current version DOE Order 430.1B, Real Property Asset Management, or current version Overview This section provides internal Departmental ...

  15. Active Acquisition Letters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procurement and Acquisition » Active Acquisition Letters Active Acquisition Letters Please remember that you can use your browser's EDIT/FIND function to perform a key-word or key-phase search for each browser page. Once you have entered the search value, click the NEXT button. When you advance to the next page, simply click the NEXT button again without re-entering the search value. July 29, 2016 Acquisition Letter No. AL-2016-07 DOE Policy on the Department's Use of Benefit Value Studies

  16. Federal Acquisition Circular 2005-63

    Broader source: Energy.gov [DOE]

    The Federal Acquisition Regulation (FAR) amendment published in the December 10, 2012 Federal Register at 77 FR 73516 implements FAR Case 2012–030 Iran Threat Reduction.

  17. Federal Acquisition Circular 2005-48

    Broader source: Energy.gov [DOE]

    Federal Acquisition Circular 2005-48 was issued December 30, 2010, 75 FR 82565. It concludes 4 separate rulemakings which are described in the attached summary sheet.

  18. Update on Procurement Opportunities and Acquisition Process

    Broader source: Energy.gov [DOE]

    Presentation from the 2015 DOE National Cleanup Workshop by J. E. Surash, P.E., Deputy Assistant Secretary, Acquisition and Project Management.

  19. Report: EMAB Acquisition and Project Management Subcommittee...

    Broader source: Energy.gov (indexed) [DOE]

    and contract management. On November 2, a very comprehensive report (124 pages) outlining continuous improvement actions in acquisition and project management was approved by Dr....

  20. Federal Acquisition Circular 2005-47

    Broader source: Energy.gov [DOE]

    Federal Acquisition Circular 2005-47 was issued December 13, 2010, 75 FR 77721. It concludes 7 separate rulemakings which are described in the attached summary sheet.

  1. Realistic Financial Planning and Rapid

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Realistic Financial Planning and Rapid Modification to Project Execution are Essential ... Ignition Facility Title: Realistic Financial Planning and Rapid Modification to ...

  2. ANGULAR MOMENTUM ACQUISITION IN GALAXY HALOS

    SciTech Connect (OSTI)

    Stewart, Kyle R.; Brooks, Alyson M.; Bullock, James S.; Maller, Ariyeh H.; Diemand, Juerg; Wadsley, James; Moustakas, Leonidas A.

    2013-05-20

    We use high-resolution cosmological hydrodynamic simulations to study the angular momentum acquisition of gaseous halos around Milky-Way-sized galaxies. We find that cold mode accreted gas enters a galaxy halo with {approx}70% more specific angular momentum than dark matter averaged over cosmic time (though with a very large dispersion). In fact, we find that all matter has a higher spin parameter when measured at accretion than when averaged over the entire halo lifetime, and is well characterized by {lambda} {approx} 0.1, at accretion. Combined with the fact that cold flow gas spends a relatively short time (1-2 dynamical times) in the halo before sinking to the center, this naturally explains why cold flow halo gas has a specific angular momentum much higher than that of the halo and often forms ''cold flow disks.'' We demonstrate that the higher angular momentum of cold flow gas is related to the fact that it tends to be accreted along filaments.

  3. FBL Outer Can Welder Acquisition Software

    Energy Science and Technology Software Center (OSTI)

    2004-01-16

    The Outer Can Welder Data Acquisition Software (OCWDAS) was originally developed by SRTC for use at Hanford to assist in the storage of their excess plutonium in the DOE standard 3013 containers until it can be properly dispositioned using one of the approved DOE methods. After Hanford OCWDAS software was the starting point for the new version developed for FB-Line. New graphical display formats and features were added to this software to make it moremore » robust and operator friendly. Several hardware changes were also made at this time and the software was modified to accommodate these as well. During the welding process, critical weld parameters such as weld current and voltage, can give valuable information about the weld. In the past, weld data from the TIG welding process, such as the bagless transfer system in FB-Line, has been monitored using strip chart recorders. The data from the weld process, recorded on the strip chart recorder traces, are reviewed to analyze the weld. The OCWDAS improves this technology by digitizing the weld data which allows for automation of the analysis process. The OCWDAS performs the necessary functions to perform the data acquisition functions during the 3013 Outer Can Welding Process. It is important to monitor the critical weld parameters, current and voltage, during a weld as they can be used to set acceptance criteria for weld acceptance. The software monitors and records the weld current, voltage, and RPM data. It also records the absolute position of the weld head during the weld process from a quadrature encoder. Digital handshaking between the AMI Welding unit and the OCWDAS ensure that both systems are operational and ready prior to the weld initiation taking place.« less

  4. Acquisition and Project Management Awards Presentations - Ingrid Kolb,

    Office of Environmental Management (EM)

    3-04 Acquisition Letter No. AL 2013-04 AL 2013-04.pdf (58.37 KB) More Documents & Publications Department of Energy Acquisition Letter 2013-04 on Executive Compensation Acquisition Letter No. AL 2014-07 Acquisition Letter 07 - Benchmark Compensation Amount for Individual Executive Salary Actions and Operating Contracts | Department of Energy

    on Acquisition Planning Considerations for Management and Operating Contracts Acquisition Letter on Acquisition Planning Considerations for

  5. Career Map: Land Acquisition Specialist | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Land Acquisition Specialist Career Map: Land Acquisition Specialist a male land acquisition specialist takes notes while surveying a piece of land. Land Acquisition Specialist Position Title Land Acquisition Specialist Alternate Title(s) Land Agent, Land Acquisition Associate Education & Training Level Bachelor degree required, prefer graduate degree Education & Training Level Description Land acquisition specialists are expected to have a bachelor's degree or higher in business, real

  6. Rapid Deployment Shelter System, Application | Y-12 National Security

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Complex Rapid Deployment Shelter ... Rapid Deployment Shelter System, Application The mp4 video format is not supported by this browser. Download video Captions: On Time: 3:30 min. The RDSS provides humanitarian and disaster relief first responders with a versatile portable shelter that is rapidly deployed under adverse conditions

  7. Rapid road repair vehicle

    DOE Patents [OSTI]

    Mara, L.M.

    1998-05-05

    Disclosed is a rapid road repair vehicle capable of moving over a surface to be repaired at near normal posted traffic speeds to scan for and find at the high rate of speed, imperfections in the pavement surface, prepare the surface imperfection for repair by air pressure and vacuum cleaning, applying a correct amount of the correct patching material to effect the repair, smooth the resulting repaired surface, and catalog the location and quality of the repairs for maintenance records of the road surface. The rapid road repair vehicle can repair surface imperfections at lower cost, improved quality, at a higher rate of speed than was not heretofor possible, with significantly reduced exposure to safety and health hazards associated with this kind of road repair activities in the past. 2 figs.

  8. Rapid road repair vehicle

    DOE Patents [OSTI]

    Mara, Leo M.

    1998-01-01

    Disclosed is a rapid road repair vehicle capable of moving over a surface to be repaired at near normal posted traffic speeds to scan for and find an the high rate of speed, imperfections in the pavement surface, prepare the surface imperfection for repair by air pressure and vacuum cleaning, applying a correct amount of the correct patching material to effect the repair, smooth the resulting repaired surface, and catalog the location and quality of the repairs for maintenance records of the road surface. The rapid road repair vehicle can repair surface imperfections at lower cost, improved quality, at a higher rate of speed than was was heretofor possible, with significantly reduced exposure to safety and health hazards associated with this kind of road repair activities in the past.

  9. Federal Acquisition Circular 2005-42

    Broader source: Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular (FAC) 2005-42 which makes changes to the Federal Acquisition Regulation (FAR). The FAC has eleven rules (seven final and four interim) and one technical amendment. Attached is a short overview of the rules to include its effective date and applicability date.

  10. Federal Acquisition Circular 2005-49

    Broader source: Energy.gov [DOE]

    Federal Acquisition Circular (FAC) 2005-49 was issued January 24, 2011 in volume 76 FR 4188. It published one interim rule Federal Acquisition Regulation (FAR) case number 2010-016 on Public Access to Federal Awardee Performance and Integrity Information System. This rule is effective January 24, 2011. The summary of the FAC is attached.

  11. Federal Acquisition Circular 2005-40

    Broader source: Energy.gov [DOE]

    Federal Acquisition Circular 2005-40 implements the Federal Awardee Performance and Integrity Information System (FAPIIS) to the Federal Acquisition Regulation. This FAC was published in the March 23,2010 issue of the Federal Register. A summary of the changes is attached.

  12. Federal Acquisition Circular 2005-56

    Broader source: Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-56 which makes miscellaneous changes to the Federal Acquisition Regulation. The Circular was published in the Federal Register on March 2, 2012 at 77 FR 12912 and 12913.

  13. Rapidly refuelable fuel cell

    DOE Patents [OSTI]

    Joy, R.W.

    1982-09-20

    A rapidly refuelable dual cell of an electrochemical type is described wherein a single anode cooperates with two cathodes and wherein the anode has a fixed position and the cathodes are urged toward opposite faces of the anodes at constant and uniform force. The associated cathodes are automatically retractable to permit the consumed anode remains to be removed from the housing and a new anode inserted between the two cathodes.

  14. Rapidly refuelable fuel cell

    DOE Patents [OSTI]

    Joy, Richard W. (Santa Clara, CA)

    1985-01-01

    A rapidly refuelable dual cell of an electrochemical type wherein a single anode cooperates with two cathodes and wherein the anode has a fixed position and the cathodes are urged toward opposite faces of the anodes at constant and uniform force. The associated cathodes are automatically retractable to permit the consumed anode remains to be removed from the housing and a new anode inserted between the two cathodes.

  15. Complete information acquisition in scanning probe microscopy

    SciTech Connect (OSTI)

    Belianinov, Alex; Kalinin, Sergei V; Jesse, Stephen

    2015-01-01

    In the last three decades, scanning probe microscopy (SPM) has emerged as a primary tool for exploring and controlling the nanoworld. A critical part of the SPM measurements is the information transfer from the tip-surface junction to a macroscopic measurement system. This process reduces the many degrees of freedom of a vibrating cantilever to relatively few parameters recorded as images. Similarly, the details of dynamic cantilever response at sub-microsecond time scales of transients, higher-order eigenmodes and harmonics are averaged out by transitioning to millisecond time scale of pixel acquisition. Hence, the amount of information available to the external observer is severely limited, and its selection is biased by the chosen data processing method. Here, we report a fundamentally new approach for SPM imaging based on information theory-type analysis of the data stream from the detector. This approach allows full exploration of complex tip-surface interactions, spatial mapping of multidimensional variability of material s properties and their mutual interactions, and SPM imaging at the information channel capacity limit.

  16. Complete information acquisition in scanning probe microscopy

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Belianinov, Alex; Kalinin, Sergei V.; Jesse, Stephen

    2015-03-13

    In the last three decades, scanning probe microscopy (SPM) has emerged as a primary tool for exploring and controlling the nanoworld. A critical part of the SPM measurements is the information transfer from the tip-surface junction to a macroscopic measurement system. This process reduces the many degrees of freedom of a vibrating cantilever to relatively few parameters recorded as images. Similarly, the details of dynamic cantilever response at sub-microsecond time scales of transients, higher-order eigenmodes and harmonics are averaged out by transitioning to millisecond time scale of pixel acquisition. Hence, the amount of information available to the external observer ismore » severely limited, and its selection is biased by the chosen data processing method. Here, we report a fundamentally new approach for SPM imaging based on information theory-type analysis of the data stream from the detector. This approach allows full exploration of complex tip-surface interactions, spatial mapping of multidimensional variability of material s properties and their mutual interactions, and SPM imaging at the information channel capacity limit.« less

  17. Rapid surface sampling and archival record system

    SciTech Connect (OSTI)

    Barren, E.; Penney, C.M.; Sheldon, R.B.

    1995-10-01

    A number of contamination sites exist in this country where the area and volume of material to be remediated is very large, approaching or exceeding 10{sup 6} m{sup 2} and 10{sup 6} m{sup 3}. Typically, only a small fraction of this material is actually contaminated. In such cases there is a strong economic motivation to test the material with a sufficient density of measurements to identify which portions are uncontaminated, so extensively they be left in place or be disposed of as uncontaminated waste. Unfortunately, since contamination often varies rapidly from position to position, this procedure can involve upwards of one million measurements per site. The situation is complicated further in many cases by the difficulties of sampling porous surfaces, such as concrete. This report describes a method for sampling concretes in which an immediate distinction can be made between contaminated and uncontaminated surfaces. Sample acquisition and analysis will be automated.

  18. Preliminary result of rapid solenoid for controlling heavy-ion...

    Office of Scientific and Technical Information (OSTI)

    The rapid ramping magnetic field could enhance limited time slice of the current and simultaneously the beam emittance changed accordingly. This approach may also useful to realize ...

  19. Distributed Intelligence Architecture for Real-Time Control,...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Distributed Intelligence Architecture for Real-Time Control, Protection and Instrumentation Systems Architecture of complex, high-speed, Real-Time Instrumentation, Acquisition, Control ...

  20. Acquisition Letters Remaining in Effect | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Effect Acquisition Letters Remaining in Effect PF2009-40.pdf (768.41 KB) PF2009-40a - Attachment-Acquisition Letter 2009-06 - Acquisition Letters Remaining in Effect (133.09 KB) More Documents & Publications Acquisition Letters Remaining In Effect AL2007-05.doc� Acquisition Letters Remaining In Effect

  1. 7pt1AcquisitionPlanning.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7pt1AcquisitionPlanning.pdf 7pt1AcquisitionPlanning.pdf (1.68 MB) More Documents & Publications ACQUISITION PLANNING Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning Acquisitions___Communications.pdf

  2. On rapid plasma rotation

    SciTech Connect (OSTI)

    Helander, P.

    2007-10-15

    The conditions under which rapid plasma rotation may occur in a general three-dimensional magnetic field with flux surfaces, such as that of a stellarator, are investigated. Rotation velocities comparable to the ion thermal speed are found to be attainable only in magnetic fields whose strength B depends on the arc length l along the field in approximately the same way for all field lines on each flux surface {psi}, i.e., B{approx_equal}f({psi},l). Moreover, it is shown that the rotation must be in the direction of the vector {nabla}{psi}x{nabla}B.

  3. Rapid prototype and test

    SciTech Connect (OSTI)

    Gregory, D.L.; Hansche, B.D.

    1996-06-01

    In order to support advanced manufacturing, Sandia has acquired the capability to produce plastic prototypes using stereolithography. Currently, these prototypes are used mainly to verify part geometry and ``fit and form`` checks. This project investigates methods for rapidly testing these plastic prototypes, and inferring from prototype test data actual metal part performance and behavior. Performances examined include static load/stress response, and structural dynamic (modal) and vibration behavior. The integration of advanced non-contacting measurement techniques including scanning laser velocimetry, laser holography, and thermoelasticity into testing of these prototypes is described. Photoelastic properties of the epoxy prototypes to reveal full field stress/strain fields are also explored.

  4. A data acquisition architecture for the SSC

    SciTech Connect (OSTI)

    Partridge, R.

    1990-01-01

    An SSC data acquisition architecture applicable to high-p{sub T} detectors is described. The architecture is based upon a small set of design principles that were chosen to simplify communication between data acquisition elements while providing the required level of flexibility and performance. The architecture features an integrated system for data collection, event building, and communication with a large processing farm. The interface to the front end electronics system is also discussed. A set of design parameters is given for a data acquisition system that should meet the needs of high-p{sub T} detectors at the SSC.

  5. SSC/BCD data acquisition system proposal

    SciTech Connect (OSTI)

    Barsotti, E.; Bowden, M.; Swoboda, C.

    1989-04-01

    The proposed new data acquisition system architecture takes event fragments off a detector over fiber optics and to a parallel event building switch. The parallel event building switch concept, taken from the telephone communications industry, along with expected technology improvements in fiber-optic data transmission speeds over the next few years, should allow data acquisition system rates to increase dramatically and exceed those rates needed for the SSC. This report briefly describes the switch architecture and fiber optics for a SSC data acquisition system.

  6. AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT Acquisition Letters (AL) that remain in effect are identified below. All other...

  7. DOJ Title Standards for Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOJ Title Standards for Acquisition DOJ Title Standards for Acquisition Title Standards 2001 (580.64 KB) More Documents & Publications Acquisition Guide for Federal Agencies REAL ESTATE PROPERTY GUIDE 2014 REAL ESTATE PROPERTY GUIDE 2013

  8. Eder Acquisition 2007 Habitat Evaluation Procedures Report.

    SciTech Connect (OSTI)

    Ashley, Paul R.

    2008-01-01

    A habitat evaluation procedures (HEP) analysis was conducted on the Eder acquisition in July 2007 to determine how many protection habitat units to credit Bonneville Power Administration (BPA) for providing funds to acquire the project site as partial mitigation for habitat losses associated with construction of Grand Coulee and Chief Joseph Dams. Baseline HEP surveys generated 3,857.64 habitat units or 1.16 HUs per acre. HEP surveys also served to document general habitat conditions. Survey results indicated that the herbaceous plant community lacked forbs species, which may be due to both livestock grazing and the late timing of the surveys. Moreover, the herbaceous plant community lacked structure based on lower than expected visual obstruction readings (VOR); likely a direct result of livestock impacts. In addition, introduced herbaceous vegetation including cultivated pasture grasses, e.g. crested wheatgrass and/or invader species such as cheatgrass and mustard, were present on most areas surveyed. The shrub element within the shrubsteppe cover type was generally a mosaic of moderate to dense shrubby areas interspersed with open grassland communities while the 'steppe' component was almost entirely devoid of shrubs. Riparian shrub and forest areas were somewhat stressed by livestock. Moreover, shrub and tree communities along the lower reaches of Nine Mile Creek suffered from lack of water due to the previous landowners 'piping' water out of the stream channel.

  9. Acquisition Planning: Revised Acquisition Letter 2009-03 and Revised DOE Acquisition Guide Chapter 7.1

    Broader source: Energy.gov [DOE]

    Acquisition Letter (AL) 2009-03 and Acquisition Guide Chapter 7.1 have been revised to move the guidance regarding who approves an Acquisition Plan for a contract exceeding $1 00 million from the AL to the Acquisition Guide. To reflect the changes, AL-2009-03 Revision 1 has replaced AL-2009-03 and the affected parts of Acquisition Guide Chapter 7.1 have been modified. Additional minor revisions to the Guide chapter were made: references to obsolete AL 96-09 and obsolete AL 2006-1 1 were deleted; the requirement to begin acquisition planning for an M&O contract at least 18 months prior to contract expiration was changed to 24 months; minor editorial changes were made to the Property Management section; and attachment 2's milestone schedule was conformed to the SEB Monthly Status Report format (that status report was established in March 201 0; see http://management.enernv.gov/docurnents/SEBMonthly Status Remrtinn Requirement.pdf).

  10. Acquisition Guide Chapter 4.804 - Contract Closeout Procedures | Department

    Office of Environmental Management (EM)

    Department of Energy 7.601 - Performance-Based Services Acquisition Acquisition Guide Chapter 37.601 - Performance-Based Services Acquisition DATE: August 15, 2016 TO: Procurement Directors/Contracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Guide Chapter 37.601, Performance-Based Services Acquisition SUMMARY: The subject guide chapter has been revised to change the chapter number from 37.2

  11. Department of Energy (DOE) Acquisition Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (DOE) Acquisition Guide Department of Energy (DOE) Acquisition Guide Regulatory requirements for the acquisition process are set forth in the Federal Acquisition Regulation (FAR) and are supplemented in the Department of Energy Acquisition Regulation (DEAR). FAR 1.301 provides for the issuance of additional internal agency guidance, including designations and delegations of authority, assignments of responsibilities, work-flow procedures, and internal reporting requirements. The DOE Acquisition

  12. Grant Acquisition and Other Funding Opportunities Webinar

    Broader source: Energy.gov [DOE]

    Kerretv Online is hosting a free webinar on grant acquisition and other funding opportunities. The training will cover developing relationships with funders, finding the right funder, writing the proposal, and understanding how to report back to the funder.

  13. Federal Acquisition Circular (FAC) 2005-69

    Broader source: Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the August 1, 2013 Federal Register at 78 FR 46779. This FAC issued 6 final rules and a technical amendment.

  14. Acquisition Career Management Handbook Change - Revised Contracting...

    Broader source: Energy.gov (indexed) [DOE]

    (43.19 KB) PF2012-16a.pdf (1.08 MB) More Documents & Publications OPAM Policy Acquisition Guides Personal Property Management Certification Brochure Accessing Online COR Training

  15. MDS-Plus data acquisition engine

    SciTech Connect (OSTI)

    Flor, G. ); Cazzaro, F.; Fregonese, G.; Stangherlin, S. )

    1990-10-01

    MDS-Plus, a model driven data acquisition system being jointly developed at Istituto Gas Ionizzati, MIT Plasma Fusion Center, and Los Alamos National Laboratory, is based on the concept of an experiment model. The model contains descriptions of experiment data, devices, and actions to be performed. The data acquisition engine, i.e., the part of the system which actually executes the acquisition process, is driven by the contents of the model itself and implemented as a set of independent processes. A scheduler keeps the data acquisition engine in step with a state machine reflecting the operation of the actual experiment; a dispatcher takes care of the appropriate sequencing of the operations associated with each state of the experiment; various servers actually execute actions on behalf of the dispatcher.

  16. Energy Systems Acquisitions Advisory Board Procedures

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-10-28

    The Notice streamlines the Energy Systems Acquisition Advisory Board (ESAAB) process to ensure informed, objective, and documented Strategic and Major System Critical Decision, Baseline Change Proposal, and site selection final decisions. Does not cancel other directives.

  17. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Microsoft Word - AcqGuide16pt1 Nov 2010 Chapter 16 - Types of Contracts Policy Flash 2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance...

  18. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating...

  19. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    528.37 KB) More Documents & Publications Microsoft Word - AL2006-07.doc Acquisition Career Management Handbook Change - Revised Contracting Officer's Representative Certification (COR) Personal Property Management Certification Brochure

  20. Federal Acquisition Circular (FAC) 2005-70

    Broader source: Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the September 30, 2013 Federal Register at 78 FR 60168. This FAC issued 2 interim rules.

  1. Site Acquisition Description/ Category Contracting Office Solicitation

    Office of Environmental Management (EM)

    Idaho Calcine Disposition Project A&E https:www.emcbc.doe. govSEBCDP EMCBC Full and ... on the DOE Acquisition Forecast (http:hqlnc.doe.govForecast) and other public sources. ...

  2. Federal Acquisition Circular (FAC) 2005-65

    Broader source: Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the January 29, 2013 Federal Register at 78 FR 6184. This FAC issued 4 final rules and a technical amendment.

  3. Federal Acquisition Circular (FAC) 2005-71

    Broader source: Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the November 25, 2013 Federal Register at 78 FR 70476. This FAC issued 2 final rules and 1...

  4. Federal Acquisition Circular (FAC) 2005-66

    Broader source: Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the February 28, 2013 Federal Register at 78 FR 13764. This FAC issued 3 final rules, 1 interim rule, and a technical amendment.

  5. Federal Acquisition Circular 2005-64

    Broader source: Energy.gov [DOE]

    The Federal Acquisition Regulation (FAR) amendment, published in the December 21, 2012 Federal Register at 77 FR 75766, implements FAR Case 2011–028 Nondisplacement of Qualified Workers Under Service Contracts.

  6. Sandia Energy - Sandia Science & Technology Park: Acquisition...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    commitment to the Albuquerque market, and hopes to be staying much longer. Capital investment since the acquisition has been over 200,000 in the 72,000-square-foot SS&TP...

  7. SPR Crude Oil Acquisition Procedures | Department of Energy

    Office of Environmental Management (EM)

    Services Petroleum Reserves Strategic Petroleum Reserve SPR Crude Oil Acquisition Procedures SPR Crude Oil Acquisition Procedures Section 301(e)(2) of the Energy Policy ...

  8. DOE to Resume Filling Strategic Petroleum Reserve: Oil Acquisition...

    Office of Environmental Management (EM)

    Resume Filling Strategic Petroleum Reserve: Oil Acquisition Slated for 2009 DOE to Resume Filling Strategic Petroleum Reserve: Oil Acquisition Slated for 2009 January 2, 2009 - ...

  9. Class Deviation from the Federal Acquisition Regulation (FAR...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Class Deviation from the Federal Acquisition Regulation (FAR) 13.5, Test Program for Certain Commercial Items Class Deviation from the Federal Acquisition Regulation (FAR) 13.5, ...

  10. Department of Energy Acquisition Regulation (DEAR) Final Rule...

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, ... More Documents & Publications Department of Energy Acquisition Regulation (DEAR) Technical ...

  11. Department of Energy Acquisition Regulation (DEAR) Final Rule...

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy Acquisition Regulation (DEAR) Final Rule for Subchapters A, B, and C ... Department of Energy Acquisition Regulation (DEAR) Final Rule for Subchapters A, B, ...

  12. Multiple-Award Contracts and Governmentwide Acquisition Contracts...

    Office of Environmental Management (EM)

    Chapter 16.5 (May 2011) 1 Multiple-Award Contracts and Governmentwide Acquisition Contracts Including Delivery Orders and Task Orders References Federal Acquisition Regulation ...

  13. Federal Acquisition Circular (FAC) 2005-67 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Acquisition Circular (FAC) 2005-67 Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the June 21, 2013 Federal ...

  14. Department of Energy Acquisition Regulation (DEAR) Subpart 903...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Acquisition Regulation (DEAR) Subpart 903.9: Whistleblower Protections for Contractor Employees Department of Energy Acquisition Regulation (DEAR) Subpart ...

  15. Federal Acquisition Circular (FAC) 2005-75 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Acquisition Circular (FAC) 2005-75 Attached for your information is a brief summary of Federal Acquisition Regulation (FAR) amendments, published in the June 24, 2014 ...

  16. Acquisition Letter No. AL 2014-07 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Letter 07 - Benchmark Compensation Amount for Individual Executive Salary Actions SUMMARY: The purpose of Acquisition Letter (AL) 2014-07 is to establish the...

  17. Idaho Spent Fuel Facility (ISFF) Project, Appropriate Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Idaho Spent Fuel Facility (ISFF) Project, Appropriate Acquisition Strategy Lessons Learned Report, NNSA, Feb 2010 Idaho Spent Fuel Facility (ISFF) Project, Appropriate Acquisition...

  18. Multi-Channel Data Acquisition System for Nuclear Pulse Processing...

    Office of Scientific and Technical Information (OSTI)

    Conference: Multi-Channel Data Acquisition System for Nuclear Pulse Processing Citation Details In-Document Search Title: Multi-Channel Data Acquisition System for Nuclear Pulse ...

  19. Carbon Compliance Acquisition 16 Limited | Open Energy Information

    Open Energy Info (EERE)

    Compliance Acquisition 16 Limited Jump to: navigation, search Name: Carbon Compliance Acquisition 16 Limited Place: United Kingdom Zip: LS12DS Product: Security broking and fund...

  20. Acquisition Letter No. AL 2013-11 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Policy Office of Acquisition and Project Management SUBJECT: Acquisition Letter 11- Non-Management and Operating (Non-M&O) Contractor Business Systems Clauses for Section H...

  1. One Acquisition Solution for Integrated Services (OASIS) - Brad...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Solution for Integrated Services (OASIS) - Brad DeMers, General Services Administration (GSA) One Acquisition Solution for Integrated Services (OASIS) - Brad DeMers,...

  2. Program & Project Management For The Acquisition Of Capital Assets...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program & Project Management For The Acquisition Of Capital Assets (310.65 KB) More Documents & Publications "Paper" Energy Systems Acquisition Advisory Board Process ESAAB ...

  3. Program & Project Management For The Acquisition Of Capital Assets...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program & Project Management For The Acquisition Of Capital Assets Program & Project Management For The Acquisition Of Capital Assets 2014 DOE Project Management Workshop ...

  4. Program & Project Management For The Acquisition Of Capital Assets...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Program & Project Management For The Acquisition Of Capital Assets Program & Project Management For The Acquisition Of Capital Assets PARS II...

  5. Program and Project Management for the Acquisition of Capital...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3.3B, Program and Project Management for the Acquisition of Capital Assets by Jay Glascock Functional areas: Acquisition, Defense Nuclear Facility Safety and Health Requirement,...

  6. Acquisition Guide Chapter 50.1- Extraordinary Contractual Actions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Guide Chapter 50.1- Extraordinary Contractual Actions (January 2009) Acquisition Guide Chapter 50.1- Extraordinary Contractual Actions (January 2009) The purpose of...

  7. Microsoft Word - ADR-Provisions-FederalAcquisitionReg.doc | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications ADR Provisions in Federal Acquisition Regulation (FAR) Microsoft Word - ACQUISITION LETTER.doc Microsoft Word - ADR Revised Policy82508Reformatted.doc...

  8. Green Lease Policies and Procedures for Lease Acquisition | Department...

    Energy Savers [EERE]

    Green Lease Policies and Procedures for Lease Acquisition Green Lease Policies and Procedures for Lease Acquisition PDF icon RSL-2007-12 More Documents & Publications Attachment 1:...

  9. Attached is Policy Flash 2013-44 Acquisition Guide- Allowability...

    Energy Savers [EERE]

    Attached is Policy Flash 2013-44 Acquisition Guide- Allowability of Incurred Costs Attached is Policy Flash 2013-44 Acquisition Guide- Allowability of Incurred Costs Attached is...

  10. 2015 DOE Acquisition and Project Management Workshop Agenda ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Acquisition and Project Management Workshop Agenda 2015 DOE Acquisition and Project Management Workshop Agenda This year's theme is "Federal Stewardship-- Providing the Value...

  11. Audit of Desktop Computer Acquisitions at the Idaho National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AUDIT OF DESKTOP COMPUTER ACQUISITIONS AT THE IDAHO NATIONAL ENGINEERING AND ... New Mexico 87185 AUDIT OF DESKTOP COMPUTER ACQUISITIONS AT THE IDAHO NATIONAL ...

  12. DOE Announces Acquisition Strategy for Post Fiscal Year 2016...

    Office of Environmental Management (EM)

    DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos ...

  13. MEMORANDUM FOR CHIEF ACQUISITION OFFICERS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Improve Communication with Industry during the Acquisition Process PDF icon MEMORANDUM FOR CHIEF ACQUISITION OFFICERS More Documents & Publications DOE Vendor Communication Plan ...

  14. 17.3 - Acquisition, Use and Disposal of Real Property

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management for the Acquisition of Capital Assets, or current version DOE Order ... Management for the Acquisition of Capital Assets may apply. For DOE actions, ...

  15. Program and Project Management for the Acquisition of Capital...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B Chg 1 (Admin Chg), Program and Project Management for the Acquisition of Capital Assets by Jay Glascock Functional areas: Acquisition, Defense Nuclear Facility Safety and Health ...

  16. Acquisition Letter: AL2005-08 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in its entirety. Microsoft Word - AL2005-08.doc (230.7 KB) More Documents & Publications OPAM Policy Acquisition Guides Acquisition Guide Chapter 19 Update Microsoft Word - ...

  17. GSA Office of Governmentwide Policy CIVILIAN AGENCY ACQUISITION...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Governmentwide Policy CIVILIAN AGENCY ACQUISITION LETTER 2013-03 May 7, 2013 MEMORANDUM FOR Cl N AG THER THAN NASA FROM: -LAURAAULETTA CHAIR CIVILIAN AGENCY ACQUISITION ...

  18. Policy Flash 2013-37 Federal Acquisition Circular (FAC) 2005...

    Broader source: Energy.gov (indexed) [DOE]

    37 Federal Acquisition Circular (FAC) 2005-66 Questions concerning this policy flash should be directed to Barbara Binney, of the Office of Acquisition and Project Management...

  19. Acquisition Letter No. AL 2014-02 | Department of Energy

    Energy Savers [EERE]

    SUBJECT: ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE SUMMARY: The subject Acquisition Letter's purpose is to provide guidance on provisional payment of fee for non ...

  20. Review of Supervisory Control and Data Acquisition (SCADA) Systems...

    Office of Scientific and Technical Information (OSTI)

    Review of Supervisory Control and Data Acquisition (SCADA) Systems Citation Details In-Document Search Title: Review of Supervisory Control and Data Acquisition (SCADA) Systems ...

  1. Carbon Compliance Acquisition 5 Limited | Open Energy Information

    Open Energy Info (EERE)

    Compliance Acquisition 5 Limited Jump to: navigation, search Name: Carbon Compliance Acquisition 5 Limited Place: Greater London, United Kingdom Zip: EC2M 2TD Sector: Carbon...

  2. Meeting the Challenge: Integrating Acquisition and Project Management...

    Energy Savers [EERE]

    Meeting the Challenge: Integrating Acquisition and Project Management - J. E. Surash, P.E. Meeting the Challenge: Integrating Acquisition and Project Management - J. E. Surash, ...

  3. U.S. Coalbed Methane Proved Reserves Acquisitions (Billion Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Acquisitions (Billion Cubic Feet) U.S. Coalbed Methane Proved Reserves Acquisitions ... Release Date: 11192015 Next Release Date: 12312016 Referring Pages: Coalbed Methane ...

  4. Data acquisition system of Moeller polarimeter Hall A Jefferson...

    Office of Scientific and Technical Information (OSTI)

    Data acquisition system of Moeller polarimeter Hall A Jefferson Lab (in Russian) Citation Details In-Document Search Title: Data acquisition system of Moeller polarimeter Hall A ...

  5. "Supervisory Control and Data Acquisition (SCADA) Systems." The...

    Energy Savers [EERE]

    "Supervisory Control and Data Acquisition (SCADA) Systems." The CIP Report. Vol 7 No 8 "Supervisory Control and Data Acquisition (SCADA) Systems." The CIP Report. Vol 7 No 8 ...

  6. Green Lease Policies and Procedures for Lease Acquisition | Department...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Green Lease Policies and Procedures for Lease Acquisition Green Lease Policies and Procedures for Lease Acquisition RSL-2007-12 (40.58 KB) More Documents & Publications Attachment ...

  7. rapidMCR

    Energy Science and Technology Software Center (OSTI)

    2011-11-04

    rapidMCR is a user friendly software package that includes automatic preprocessing, analysis, and viewing of hyperspectral image data sets. Currently, this software package specifically preprocesses and analyzes hyperspectral fluorescence image data sets that have been created on Sandia hyperspectral imaging microscopes; however, this software can be modified to include spectroscopic image data sets from other (non-Sandia developed) instruments as well. This software relies on using prior information about the spectroscopic image data sets by conductingmore » a rigorous characterization of the instrument. By characterizing the instrument for noise and artifacts, we can implement our algorithms to account for the effects specific to a particular instrument. This allows us to automate the data preprocessing while improving the analysis results.« less

  8. Solid state rapid thermocycling

    DOE Patents [OSTI]

    Beer, Neil Reginald; Spadaccini, Christopher

    2014-05-13

    The rapid thermal cycling of a material is targeted. A solid state heat exchanger with a first well and second well is coupled to a power module. A thermoelectric element is coupled to the first well, the second well, and the power module, is configured to transfer thermal energy from the first well to the second well when current from the power module flows through the thermoelectric element in a first direction, and is configured to transfer thermal energy from the second well to the first well when current from the power module flows through the thermoelectric element in a second direction. A controller may be coupled to the thermoelectric elements, and may switch the direction of current flowing through the thermoelectric element in response to a determination by sensors coupled to the wells that the amount of thermal energy in the wells falls below or exceeds a pre-determined threshold.

  9. acquisition and project management | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration and project management Acquisition and Project Management Office volunteers get up-close look at Office of Secure Transportation exercise Contracting professionals from the NNSA Acquisition & Project Management (APM) Field Program Section (FPS) recently served as role players for Office of Secure Transportation (OST) training exercises in Arkansas and Oklahoma. OST Federal Agents transport U.S. nuclear weapons, components and... SNL Starting Points Sandia Field Office Home

  10. DOE Federal Acquisition Regulation Clause Usage Guide

    Broader source: Energy.gov [DOE]

    The subject matrix contained an error related to the solicitation provision at FAR 52.209-5. That provision was identified as Not Applicable for most contract types but it should have identified the provisions as Required for most contract types but Not Applicable for simplified acquisitions and acquisitions of commercial items. A corrected matrix is attached and the matrix in the Stripes Library is being replaced.

  11. Small Business Issues for Environmental Restoration Acquisitions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issues for Environmental Restoration Acquisitions The Department of Energy's best practices to reduce and eliminate barriers to small businesses entering into prime contracts for major environmental remediation acquisitions are as follows: Withholding of Payments Billing Cycles Allowability of Insurance Bonding Requirements WITHHOLDING OF PAYMENTS Under a cost reimbursement contract, the Federal Government makes payments conditionally, subject to a final audit. Typically, in a cost reimbursement

  12. Acquisition Management | National Nuclear Security Administration | (NNSA)

    National Nuclear Security Administration (NNSA)

    Acquisition Management The Office of Acquisition Management supports NNSA's efforts to: Reduce Nuclear Dangers; Manage the nuclear weapons stockpile; Recapitalize the nuclear infrastructure and deterrent capability; Strengthen the science, technology, and engineering base; and, Continue NNSA management reforms. Our Values: Providing solutions: We will use our expertise and knowledge to be solutions people assisting our business partners to achieve mission goals while ensuring compliance with

  13. Acquisition News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    criminal violations, defrauding the public by engaging in years of widespread time card fraud. June 8, 2012 DOE Awards Hanford Site Occupational Medical Services Contract The U.S....

  14. Acquisition Guide, Chapter 38.1, Strategic Acquisition Transactions: A Guide for

    Broader source: Energy.gov [DOE]

    The Strategic Acquisition Transactions Guide has been updated to reflect changes in the Federal Acquisition Regulation through Federal Acquisition Circular 2005-38 and other technical and editorial changes. A summary of these changes is provided on page three of the attached Guide. This Guide does not include the additional requirements required for orders funded under the Recovery Act. See the Recovery Act Guide for those requirements at http://management.energy.gov/policy~guidance/1672.htm.

  15. Policy Flash 2013-78 Acquisition Guide Chapter 7.3 Acquisition...

    Broader source: Energy.gov (indexed) [DOE]

    Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and...

  16. NA APM - Associate Administrator for Acquisition & Project Management |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) APM - Associate Administrator for Acquisition & Project Management

  17. Acquisition Guide Chapter 15 1 - Source Selection Guide | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 5 1 - Source Selection Guide Acquisition Guide Chapter 15 1 - Source Selection Guide Acquisition Guide Chapter 15 1 - (Final - Changes Accepted)(April 2013).pdf (917.82 KB) More Documents & Publications DOE Source Evaluation Board (SEB) Document Templates DOE Acquisition Guide Chapter 15.1 Source Selection Guide OPAM Policy Acquisition Guides

  18. 2015 DOE Acquisition and Project Management (APM) Workshop Presentations

    Broader source: Energy.gov [DOE]

    This page contains the presentations presented at the 2015 DOE Acquisition and Project Management (APM) Workshop.

  19. Acquisition Letter No. AL-2016-08 | Department of Energy

    Office of Environmental Management (EM)

    Archive listing Acquisition Letter Archive listing Acquisition Letter Archive listing (161.94 KB) More Documents & Publications Microsoft Word - LibraryofPriorRulemakings.doc Acquisition Letters Remaining in Effect Policy Flash Archive Search File

    NO. AL 2016-05 Acquisition Letter NO. AL 2016-05 DATE: May 3, 2016 TO: Procurement Directors FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: AL 2016-05-Determining if an

  20. 17.1 - Interagency Acquisitions, Interagency Transactions, and Interagency Agreements

    Energy Savers [EERE]

    17.1 (June 2012) 1 Interagency Acquisitions, Interagency Transactions, and Interagency Agreements CONTENTS Guiding Principles  This chapter provides guidance on interagency acquisitions, interagency transactions and interagency agreements  In addition to interagency acquisitions authorized by the Economy Act, Federal Acquisition Regulation (FAR) 17.5 is revised to broaden the scope of coverage to address all Interagency Acquisitions to include orders over $500,000 issued against Federal

  1. Finding and Winning Simplified Acquisitions, Part 2 | Department of Energy

    Energy Savers [EERE]

    Finding and Winning Simplified Acquisitions, Part 2 Finding and Winning Simplified Acquisitions, Part 2 Presented at the 15th Annual DOE Small Business Forum & Expo by: Guy Timberlake, Chief Visionary Officer and Chief Executive Officer, The American Small Business Coalition Finding and Winning Simplified Acquisitions, Part 2 (6.47 MB) More Documents & Publications Finding and Winning Simplified Acquisitions, Part 1 December 12, 2013 Business Opportunity Session Presentations Acquisition

  2. Acquisition & Financial Assistance Rules Status | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition & Financial Assistance Rules Status Acquisition & Financial Assistance Rules Status Subscribe to Acquisition & Financial Assistance Rules Status Updates Acquisition & Financial Assistance Rules Status July 2016 2nd Update (192.52 KB) More Documents & Publications Rulemaking List for Public List Serve May 2016 Department of Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, 945, 952, and 970 regarding Government Property 15th Semi-Annual

  3. Updated Acquisition Guide Chapter 23 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Updated Acquisition Guide Chapter 23 Updated Acquisition Guide Chapter 23 Acquisition Guide Chapter 23 concerning environmental considerations for DOE contracts has been updated. The update recognizes the new Sustainable Acquisition Program clauses which became effective October 20, 2010 as a result of the rule published September 22, 2010, at 75 FR 57690. These clauses should be incorporated in new awards or added to existing applicable contracts. PF2011-25 Updated Acquisition Guide Chapter 23

  4. Rapid Formation of Soft Hydrophilic Silicone Elastomer Surfaces (Journal

    Office of Scientific and Technical Information (OSTI)

    Article) | SciTech Connect Rapid Formation of Soft Hydrophilic Silicone Elastomer Surfaces Citation Details In-Document Search Title: Rapid Formation of Soft Hydrophilic Silicone Elastomer Surfaces We report on the rapid formation of hydrophilic silicone elastomer surfaces by ultraviolet/ozone (UVO) irradiation of poly(vinylmethylsiloxane) (PVMS) network films. Our results reveal that the PVMS network surfaces render hydrophilic upon only a short UVO exposure time (seconds to a few minutes).

  5. Trigger Data Acquisition | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Trigger Data Acquisition Trigger Data Acquisition Argonne and MSU have taken responsibility for the Level 2 Supervisor and Region-of-Interest Builder components of the Level 2 trigger. These custom electronics boards route a subset of the information from the detector system to the ATLAS High Level Trigger. The trigger system as a whole reduces the input event rate from 100kHz to a few kHz on the basis of the information from the RoIB and eventually, following further processing, to ~200 Hz for

  6. RAPID/Roadmap/Coverage | Open Energy Information

    Open Energy Info (EERE)

    RAPIDRoadmapCoverage < RAPID | Roadmap Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit About Bulk Transmission...

  7. RAPID/Outreach | Open Energy Information

    Open Energy Info (EERE)

    Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us Outreach Materials RAPID 2-page Flyer RAPID 2-page Flyer Last updated: 8 Apr 2014 RAPID Project...

  8. RAPID/Contact | Open Energy Information

    Open Energy Info (EERE)

    RAPIDContact < RAPID(Redirected from RAPID toolkitContact) Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission...

  9. Rapid flash lamp

    DOE Patents [OSTI]

    Gavenonis, Thomas L.; Hewitt, William H.

    1989-01-01

    A method and apparatus for providing low peak time and pulse width actinic energy from a lamp by varying the input energy of a capacitive ignition circuit having relatively high voltage to the lamp. The lamp comprises a pair of electrodes disposed within a light transparent envelope in which a combustible and an oxidizing gas reaction combination is located. The combustible is preferably shredded zirconium which is in contact with and provides an electrical discharge path between the electrodes. The gas is preferably pressurized oxygen.

  10. Rapid flash lamp

    DOE Patents [OSTI]

    Gavenonis, Thomas L.; Hewitt, William H.

    1989-06-06

    A method and apparatus for providing low peak time and pulse width actinic energy from a lamp by varying the input energy of a capacitive ignition circuit having relatively high voltage to the lamp. The lamp comprises a pair of electrodes disposed within a light transparent envelope in which a combustible and an oxidizing gas reaction combination is located. The combustible is preferably shredded zirconium which is in contact with and provides an electrical discharge path between the electrodes. The gas is preferably pressurized oxygen.

  11. Dumand-array data-acquisition system

    SciTech Connect (OSTI)

    Brenner, A.E.; Theriot, D.; Dau, W.D.; Geelhood, B.D.; Harris, F.; Learned, J.G.; Stenger, V.; March, R.; Roos, C.; Shumard, E.

    1982-04-01

    An overall data acquisition approach for DUMAND is described. The scheme assumes one array to shore optical fiber transmission line for each string of the array. The basic event sampling period is approx. 13 ..mu..sec. All potentially interesting data is transmitted to shore where the major processing is performed.

  12. Federal Acquisition Circular (FAC) 2005-68

    Office of Energy Efficiency and Renewable Energy (EERE)

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the June 26, 2013 Federal Register at 78 FR 38535. This FAC issued 1 interim rule. To view this rule go to Federal Register site then search by date and go to General Services Administration to find the rule https://www.federalregister.gov/articles/current.

  13. Federal Acquisition Circular (FAC) 2005-76

    Broader source: Energy.gov [DOE]

    Attached for your information is a brief summary of Federal Acquisition Regulation (FAR) amendments, published in the July 25, 2014 Federal Register at 79 FR 43574. FAC 2005-76 issued 2 final rules, 1 interim rule and 1 technical amendment.

  14. Rapid Syndrome Validation Project (RSVP)

    Energy Science and Technology Software Center (OSTI)

    2004-03-26

    RSVP facilitates the two-way communication between physicians (who are the “sensors” for disease in a community) and public health officials (who are the true “experts” in determining whether or not disease outbreaks are taking place in community). Currently, there is no software product that enables real-time on line reporting to local public health officials, nor timely feedback to clinicians taking care of ill patients. RSVP takes into consideration the cultural differences in the practice ofmore » medicine across the US and internationally, and provides for automated alerting of public health officials in the setting of a potentially serious disease outbreak. In addition, clinicians’ parficipation is immediately rewarded by providing information that is meaningful for the management of their patients. We envision the addition to RSVP of automated statistical analysis of data (currentty being done on a case-by-case basis by hand), including SNL technology based on neural network analysis. Integration of other SNL technology into RSVP will provide added-value, and will dramatically assist public health officials in their quest to identify disease outbreaks as early as possible in an epidemic (even before the actual level of known cases exceeds historical background) based on other parameters such as rapidity of spread of symptoms in a population. In addition, we are developing a parallel system of syndrome surveillance in animals (called "RSVP-A"), in collaboration with Kansas State University. Data from animal disease outbreaks will also be made available to physicians caring for human patients as zoonotic disease may be important in human epidemics.« less

  15. Rapid Deployment Shelter System | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rapid Deployment Shelter ... Rapid Deployment Shelter System The mp4 video format is not supported by this browser. Download video Captions: On Time: 5:03 min. Originally designed as a mobile surgical suite, the RDSS can also be converted and used for a command, control, logisitics, or operations center

  16. POLICY FLASH 2014-23 Acquisition Guide 13.3 Simplified Acquisition Procedures

    Office of Energy Efficiency and Renewable Energy (EERE)

    Questions concerning this policy flash should be directed to Carol Jenkins, of the Office of Acquisition and Project Management Policy at 202-287-1827 or at Carol.Jenkins@hq.doe.gov

  17. Policy Flash 2013-78 Acquisition Guide Chapter 7.3 Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at jason.taylor@hq.doe....

  18. Combining nanocalorimetry and dynamic transmission electron microscopy for in situ characterization of materials processes under rapid heating and cooling

    SciTech Connect (OSTI)

    Grapes, Michael D.; LaGrange, Thomas; Reed, Bryan W.; Campbell, Geoffrey H.; Friedman, Lawrence H.; LaVan, David A.; Weihs, Timothy P.

    2014-08-15

    Nanocalorimetry is a chip-based thermal analysis technique capable of analyzing endothermic and exothermic reactions at very high heating and cooling rates. Here, we couple a nanocalorimeter with an extremely fast in situ microstructural characterization tool to identify the physical origin of rapid enthalpic signals. More specifically, we describe the development of a system to enable in situ nanocalorimetry experiments in the dynamic transmission electron microscope (DTEM), a time-resolved TEM capable of generating images and electron diffraction patterns with exposure times of 30 ns500 ns. The full experimental system consists of a modified nanocalorimeter sensor, a custom-built in situ nanocalorimetry holder, a data acquisition system, and the DTEM itself, and is capable of thermodynamic and microstructural characterization of reactions over a range of heating rates (10{sup 2} K/s10{sup 5} K/s) accessible by conventional (DC) nanocalorimetry. To establish its ability to capture synchronized calorimetric and microstructural data during rapid transformations, this work describes measurements on the melting of an aluminum thin film. We were able to identify the phase transformation in both the nanocalorimetry traces and in electron diffraction patterns taken by the DTEM. Potential applications for the newly developed system are described and future system improvements are discussed.

  19. Actively triggered 4d cone-beam CT acquisition

    SciTech Connect (OSTI)

    Fast, Martin F.; Wisotzky, Eric; Oelfke, Uwe; Nill, Simeon

    2013-09-15

    Purpose: 4d cone-beam computed tomography (CBCT) scans are usually reconstructed by extracting the motion information from the 2d projections or an external surrogate signal, and binning the individual projections into multiple respiratory phases. In this after-the-fact binning approach, however, projections are unevenly distributed over respiratory phases resulting in inefficient utilization of imaging dose. To avoid excess dose in certain respiratory phases, and poor image quality due to a lack of projections in others, the authors have developed a novel 4d CBCT acquisition framework which actively triggers 2d projections based on the forward-predicted position of the tumor.Methods: The forward-prediction of the tumor position was independently established using either (i) an electromagnetic (EM) tracking system based on implanted EM-transponders which act as a surrogate for the tumor position, or (ii) an external motion sensor measuring the chest-wall displacement and correlating this external motion to the phase-shifted diaphragm motion derived from the acquired images. In order to avoid EM-induced artifacts in the imaging detector, the authors devised a simple but effective Faraday shielding cage. The authors demonstrated the feasibility of their acquisition strategy by scanning an anthropomorphic lung phantom moving on 1d or 2d sinusoidal trajectories.Results: With both tumor position devices, the authors were able to acquire 4d CBCTs free of motion blurring. For scans based on the EM tracking system, reconstruction artifacts stemming from the presence of the EM-array and the EM-transponders were greatly reduced using newly developed correction algorithms. By tuning the imaging frequency independently for each respiratory phase prior to acquisition, it was possible to harmonize the number of projections over respiratory phases. Depending on the breathing period (3.5 or 5 s) and the gantry rotation time (4 or 5 min), between ?90 and 145 projections were

  20. RAPID FREEFORM SHEET METAL FORMING: TECHNOLOGY DEVELOPMENT AND SYSTEM VERIFICATION

    Broader source: Energy.gov [DOE]

    This project will develop RApid Freeform Sheet Metal Forming Technology (RAFFT) in an industrial environment based on Double Sided Incremental Forming (DSIF) to produce industrial parts within one week while also satisfying dimensional accuracy, surface finish, and cycle time.

  1. Interactive Rapid Dose Assessment Model.

    Energy Science and Technology Software Center (OSTI)

    1988-10-31

    IRDAM is a micro-computer based program for rapidly assessing the radiological impact of an accident at a nuclear power plant. The code packaged October 1988 is Version 3.

  2. Acquisition Letter No. 2012-03 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    No. 2012-03 Acquisition Letter No. 2012-03 AL_2012-03.pdf (189.71 KB) More Documents & Publications Acquisition Letter on Allowability of Incurred Costs Due to Contractor Errors

  3. ESPC ENABLE Acquisition Plan Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The acquisition plan is the first formal step in the ESPC ENABLE procurement process. The completed acquisition plan will serve as a guide throughout the rest of the process. ...

  4. Acquisition Guide Chapter 15.2 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5.2 Acquisition Guide Chapter 15.2 Unsolicited Proposals - Revised August 2015. PDF icon Acquisition Guide Chapter 15.2 More Documents & Publications POLICY FLASH 2015-34 OPAM...

  5. Chapter 41 - Acquisition of Utility Services | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 - Acquisition of Utility Services Chapter 41 - Acquisition of Utility Services PDF icon 41.1Utilities0.pdf More Documents & Publications AcqGuide41pt1.doc&0; Chapter 9 -...

  6. Acquisition Letter No. AL 2014-02 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Letter No. AL 2014-02 Acquisition Letter No. AL 2014-02 DATE: October 31, 2013 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial...

  7. New Mexico - West Crude Oil + Lease Condensate Reserves Acquisitions...

    U.S. Energy Information Administration (EIA) Indexed Site

    Acquisitions (Million Barrels) New Mexico - West Crude Oil + Lease Condensate Reserves Acquisitions (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

  8. New Mexico - East Crude Oil + Lease Condensate Reserves Acquisitions...

    U.S. Energy Information Administration (EIA) Indexed Site

    Acquisitions (Million Barrels) New Mexico - East Crude Oil + Lease Condensate Reserves Acquisitions (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7...

  9. New Mexico Crude Oil + Lease Condensate Reserves Acquisitions...

    U.S. Energy Information Administration (EIA) Indexed Site

    Acquisitions (Million Barrels) New Mexico Crude Oil + Lease Condensate Reserves Acquisitions (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8...

  10. Program and Project Management for the Acquisition of Capital...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    13.B, Chg 1 (PgChg), Program and Project Management for the Acquisition of Capital Assets by Jay Glascock Functional areas: Acquisition, Defense Nuclear Facility Safety and Health...

  11. Program and Project Management for the Acquisition of Capital...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARCHIVED DOE O 413.3A Chg 1, Program and Project Management for the Acquisition of Capital Assets by John Makepeace Functional areas: Acquisition, Defense Nuclear Facility Safety...

  12. Executive Order 12969-Federal Acquisition and Community RightTo...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2969-Federal Acquisition and Community RightTo-Know Executive Order 12969-Federal Acquisition and Community RightTo-Know The efficiency of the Federal Government is served when it ...

  13. Acquisition Letter No. AL 2013-10 | Department of Energy

    Office of Environmental Management (EM)

    More Documents & Publications Acquisition Letter 09 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause Policy Flash 2016-11 Acquisition Letter No. AL 2016-01

  14. A simulation of data acquisition system for SSC experiments

    SciTech Connect (OSTI)

    Watase, Y.; Ikeda, H.

    1989-04-01

    A simulation on some parts of the data acquisition system was performed using a general purpose simulation language GPSS. Several results of the simulation are discussed for the data acquisition system for the SSC experiment.

  15. Policy Flash 2014-11 Federal Acquisition Circular (FAC) 2005...

    Office of Environmental Management (EM)

    11 Federal Acquisition Circular (FAC) 2005-71 Policy Flash 2014-11 Federal Acquisition Circular (FAC) 2005-71 Questions concerning this policy flash should be directed to Barbara...

  16. ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE | Department...

    Broader source: Energy.gov (indexed) [DOE]

    on provisional payment of fee for non management and operating contracts. PF2014-08 Acquisition Letter 2014-02 Provisional Payment of FeeAcquisition Letter 2014-02 Provisional ...

  17. Policy Flash 2013-63 Federal Acquisition Circular (FAC) 2005...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Federal Acquisition Circular (FAC) 2005-67 Policy Flash 2013-63 Federal Acquisition Circular (FAC) 2005-67 Questions concerning this policy flash should be directed to Barbara...

  18. TOPDAQ Acquisition Utility Beta version 1.0

    Energy Science and Technology Software Center (OSTI)

    2010-01-07

    This TOPDAQ Acquisition Utility uses 5 digital cameras mounted on a vertical pole, maintained in a vertical position using sensors and actuators, to take photographs of an RP-2 or RP-3 module, one camera for each row (4) and one in the center for driving, when the module is at 0 degrees, or facing the eastern horizon. These photographs and other data collected at the same time the pictures are taken are analyzed by the TOPAAPmore » Analysis Utility. The TOPCAT implemented by the TOPDAQ Acquisition Utility and TOPAAP Analysis Utility programs optimizes the alignment of each RP in a module on a parabolic trough solar collector array (SCA) to maximize the amount of solar energy intercepted by the solar receiver. The camera fixture and related hardware are mounted on a pickup truck and driven between rows in a parabolic trough solar power plant. An ultrasonic distance meter is used to maintain the correct distance between the cameras and the RP module. Along with the two leveling actuators, a third actuator is used to maintain a proper relative vertical position between the cameras and the RP module. The TOPDAQ Acquisition Utility facilitates file management by keeping track of which RP module data is being taken and also controls the exposure levels for each camera to maintain a high contract ratio in the photograph even as the available daylight changes throughout the day. The theoretical TOPCAT hardware and software support the current industry standard RP-2 and RP-3 module geometries.« less

  19. NEPA strategy for the Bonneville Power Administration energy resource acquisition

    SciTech Connect (OSTI)

    Pierce, K.S.; Alton, C.C.; Linehan, A.O.

    1995-12-01

    The Bonneville Power Administration (BPA) has a statutory obligation to supply cost-effective electric power to its customers. BPA must also be consistent with the Pacific Northwest Electric Power Planning and Conservation Act, which requires consideration of the Northwest Power Planning Council`s Conservation and Electric Power Plan and Fish and Wildlife Program. The challenge is to operate effectively within an increasingly competitive and dynamic electric utility market while continuing its commitment to the National Environmental Policy Act (NEPA). BPA developed a tiered approach to its environmental analyses associated with energy resource planning and acquisition. The Resource Programs Environmental Impact Statement (RPEIS) is a programmatic document designed to support energy resource decisions for several years. The RPEIS includes a description of the environmental impacts and potential mitigation measures for various energy resources-including conservation, efficiency improvements, renewable resources, cogeneration, combustion turbines, nuclear, and coal. Information was also provided on fuel switching, load management, and emerging technologies. After analyzing the environmental trade-offs among resources, the RPEIS focuses on the cumulative effects of adding these resources to the existing power system. The Record of Decision documents that BPA`s resource acquisitions will include all cost-effective conservation and efficiency improvements, supplemented by a mix of renewables and thermal resources. Subsequent site-specific documents have been prepared on individual resource acquisitions. By focusing environmental reviews on the actual issues ripe for decision and by providing timely environmental information to the public and to the decisionmakers, this tiered approach led to better decisionmaking. BPA was able to operate in a more business-like manner while assuring NEPA compliance.

  20. The CDMS II data acquisition system

    SciTech Connect (OSTI)

    Bauer, D.A.; Burke, S.; Cooley, J.; Crisler, M.; Cushman, P.; DeJongh, F.; Duong, L.; Ferril, R.; Golwala, S.R.; Hall, J.; Holmgren, D.; ,

    2011-01-01

    The Data Acquisition System for the CDMS II dark matter experiment was designed and built when the experiment moved to its new underground installation at the Soudan Lab. The combination of remote operation and increased data load necessitated a completely new design. Elements of the original LabView system remained as stand-alone diagnostic programs, but the main data processing moved to a VME-based system with custom electronics for signal conditioning, trigger formation and buffering. The data rate was increased 100-fold and the automated cryogenic system was linked to the data acquisition. A modular server framework with associated user interfaces was implemented in Java to allow control and monitoring of the entire experiment remotely.

  1. Refiner Acquisition Cost of Crude Oil - Composite

    U.S. Energy Information Administration (EIA) Indexed Site

    Acquisition Type: Composite Domestic Imported Period: Monthly Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show Data By: Acquisition Type Area Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 View History U.S. 28.53 33.82 37.71 42.88 45.95 42.90 1974-2016 East Coast (PADD 1) 31.36 36.91 40.32 45.24 48.11 2004-2016 Midwest (PADD 2) 27.01 32.80 37.04 42.47 45.80 2004-2016 Gulf Coast (PADD 3) 28.53 33.17 37.05 42.13 45.68

  2. Review of Supervisory Control and Data Acquisition (SCADA) Systems...

    Office of Scientific and Technical Information (OSTI)

    United States Language: English Subject: 24 - POWER TRANSMISSION AND DISTRIBUTION, 99 - GENERAL AND MISCELLANEOUSMATHEMATICS, COMPUTING, AND INFORMATION SCIENCE; DATA ACQUISITION...

  3. New Strategic Sourcing Acquisition Guide Chapter 7.2

    Broader source: Energy.gov [DOE]

    The Senior Procurement Executive has issued guidance for strategic sourcing requirements in new DOE Acquisition Guide Chapter 7.2.

  4. Acquisition Letter No. AL 2014-03 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Acquisition Letter No. AL 2014-03 DATE: January 07, 2014 TO: Procurement Directors/Contracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: ACQUISITION LETTER 2014-03: SUMMARY: The subject Acquisition Letter's purpose is to provide guidance to Contracting Officers on allowability of contractor litigation defense and settlement costs in light of Secretary of the Army v. Tecom. The guidance applies

  5. Acquisition Letter No. AL 2016-02 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Acquisition Letter No. AL 2016-02 DATE: February 17, 2016 TO: Procurement Directors/Contracting Officers FROM: Acting Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Letter 2016-02/Financial Acquisition Letter 2016-02 Congressional Notifications and Quarterly Reporting to the Appropriations Committees in Accordance with the Energy and Water Development and Related Agencies Appropriations Act, 2016, Division D, Title

  6. Acquisition letter No. AL 2015-05 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    letter No. AL 2015-05 Acquisition letter No. AL 2015-05 DATE: May 12, 2015 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Acquisition Letters Remaining in Effect SUMMARY: Acquisition letter 2015-05 has been issued. It lists ALs currently in effect and the discontinued ALs, along with the reason why the AL is no longer in effect. This Flash will be available

  7. National Geothermal Data Systems Data Acquisition and Access | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Systems Data Acquisition and Access National Geothermal Data Systems Data Acquisition and Access Project objective: To support the acquisition of new and legacy data from DOE-funded demonstration projects, the US Geological Survey, and other sources. analysis_snyder_ngds_data_acquisition.pdf (1.77 MB) More Documents & Publications National Geothermal Data System Architecture Design, Testing and Maintenance State Geological Survey Contributions to the National Geothermal Data

  8. POLICY GUIDANCE MEMORANDUM #09A Direct Hire Authority for Acquisition

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Positions (Expired) | Department of Energy 9A Direct Hire Authority for Acquisition Positions (Expired) POLICY GUIDANCE MEMORANDUM #09A Direct Hire Authority for Acquisition Positions (Expired) THIS GUIDANCE HAS EXPIRED This Policy on Direct Hire Authority for Acquisition Positions has been replaced by POLICY GUIDANCE MEMORANDUM #34B Direct Hire Authority for Contract Specialist Positions POLICY GUIDANCE MEMORANDUM #09A Direct Hire Authority for Acquisition Positions (Expired) (49.21 KB)

  9. Federal Acquisition Circular 2005-34 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2005-34 Federal Acquisition Circular 2005-34 PF2009-54.pdf (879.43 KB) PF2009-54a - Attachment-Summary of the Contents of Federal Acquisition Circular 2005-34 Published in the July 1, 2009 Issue of the Federal Register at Page 31556 (11.54 KB) More Documents & Publications Federal Acquisition Circular 2005-40 Federal Acquisition Circular 2005-47 Policy Flash Archive Search File

  10. Program and Project Management for the Acquisition of Capital Assets |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Program and Project Management for the Acquisition of Capital Assets Program and Project Management for the Acquisition of Capital Assets This Order provides project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and capable of meeting mission performance and environmental safety and health standards. Program and Project Management for the Acquisition of Capital Assets More Documents & Publications Guiding

  11. Acquisition Guide Chapter 71.1- Headquarters Business Clearance Process

    Broader source: Energy.gov [DOE]

    Revised Acquisition Guide Chapter 71.1, "Headquarters Business Clearance Process" Issued as Policy Flash 2008-66

  12. Acquisition Guide Chapter 71.1 - Headquarters Business Clearance...

    Broader source: Energy.gov (indexed) [DOE]

    In accomplishing its mission, the FAOD reviews acquisition plans, solicitations, source selection documents, contracts, and other relevant transactional documentation....

  13. Data Acquisition-Manipulation (Monaster And Coolbaugh, 2007)...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation (Monaster And Coolbaugh, 2007) Exploration Activity Details...

  14. Data Acquisition-Manipulation At Cascades Region (Ingebritsen...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Cascades Region (Ingebritsen & Mariner, 2010) Exploration...

  15. Data Acquisition-Manipulation (Beck & Cermak, 1989) | Open Energy...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation (Beck & Cermak, 1989) Exploration Activity Details Location...

  16. Data Acquisition-Manipulation At Truckhaven Area (Layman Energy...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Truckhaven Area (Layman Energy Associates, 2007)...

  17. Data Acquisition-Manipulation (Verma & Santoyo, 1997) | Open...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation (Verma & Santoyo, 1997) Exploration Activity Details Location...

  18. Assessment of Acquisition and Financial Assistance Operations | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Acquisition and Financial Assistance Operations Assessment of Acquisition and Financial Assistance Operations The Department of Energy's Office of Energy Efficiency and Renewable Energy's Assessment of Acquisition and Financial Assistance Operations, in coordination with the National Academy of Public Administration. Assessment of Acquisition and Financial Assistance Operations (754.94 KB) More Documents & Publications Reorganization of the Office of Energy Efficiency and

  19. Attachment 1: Green Lease Policies and Procedures for Lease Acquisition |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1: Green Lease Policies and Procedures for Lease Acquisition Attachment 1: Green Lease Policies and Procedures for Lease Acquisition Green Lease Policies and Procedures for Lease Acquisition (45.31 KB) More Documents & Publications Green Lease Policies and Procedures for Lease Acquisition Attachment 2: Solicitation for Offers with New and Revised Green Lease Text Energy Efficiency in Separate Tenant Spaces - A Feasibility Study

  20. NA APM - Associate Administrator for Acquisition & Project Management...

    National Nuclear Security Administration (NNSA)

    APM - Associate Administrator for Acquisition & Project Management | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the ...

  1. Office of Acquisition and Financial Assessment PIA, Golden Field Office |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Acquisition and Financial Assessment PIA, Golden Field Office Office of Acquisition and Financial Assessment PIA, Golden Field Office Office of Acquisition and Financial Assessment PIA, Golden Field Office Office of Acquisition and Financial Assessment PIA, Golden Field Office (245.98 KB) More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory

  2. National Supervisory Control and Data Acquisition (SCADA)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Supervisory Control and Data Acquisition (SCADA) - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste

  3. Department of Energy Acquisition Regulation (DEAR)

    Office of Energy Efficiency and Renewable Energy (EERE)

    To ensure that you are using the most recent version of the Department of Energy Acquisition Regulation (DEAR), use one of the electronic versions at one of the following websites: DOE Procurement - http://management.energy.gov/DEAR.htm; Electronic Code of Federal Regulations - http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&tpl=/ecfrbrowse/Tit... or Hill Air Force Base - http://farsite.hill.af.mil/vfdoea.htm.

  4. Acquisition Description/ Category Solicitation Method Contract Type

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7/5/2016 Acquisition Description/ Category Solicitation Method Contract Type Period of Performance Contract Value All EM Sites DOE-Wide commercial low-level waste treatment Energy Solutions, Inc. Perma-Fix Environmental Services, Inc. Philo-Technics, Ltd. Studsvik, Inc. Full and Open Competition Firm Fixed Price IDIQ 6/30/08-6/29/13 $450M Multiple award indefinite delivery/indefinite quality (IDIQ) Set-aside contracts for nationwide environmental services/ environmental cleanup Clauss

  5. ADR Provisions in Federal Acquisition Regulation (FAR)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ADR Provisions in Federal Acquisition Regulation (FAR) d. Alternative means of dispute resolution. Notwithstanding any other provision of this chapter, a contractor and a contracting officer may use any alternative means of dispute resolution under subchapter IV of chapter 5 of title 5, or other mutually agreeable procedures, for resolving claims. In a case in which such alternative means of dispute resolution or other mutually agreeable procedures are used, the contractor shall certify that the

  6. Acquisition Guide Chapter Updates for Threshold Changes

    Broader source: Energy.gov [DOE]

    The Federal Acquisition Regulation is regularly updated to revise dollar thresholds associated for various activities. Policy Flash 2011-15 provides a quick reference guide to the threshold changes that were effective October 1, 2010. This Flash is to inform you that the following Guide Chapters have been updated to reflect the threshold changes: Chapter 3.1 Chapter 6.1 Chapter 15.4-4 Chapter 16.1 Chapter 18.0 Chapter 37.1 Chapter 38.1

  7. Calorimeter Data Acquisition and Reporting Software

    SciTech Connect (OSTI)

    Plummer, Jean R.; Levi, Gerald

    1998-08-27

    The calorimeter Data Acquisition and Reporting Program performs the calculations necessary to calculate the calorimetric sample results in grams and provide a printable report for up to twelve Mound Calorimeters. To determine a standard''s wattage or sample gram fill, the reporting program retrieves the output voltage from the power supply at the calorimeter and a temperature resistant resistor via a voltmeter and digital input card in a Hewlett Packard Data Acquisition Unit (DAQ). From the retrieved voltage data, the reporting program can calculate a standard''s wattage output and sample gram fill. The reporting program also determines equilibrium (stability) by performing a stability algorithm bassed on user defined slope an/or sigma values for the previous forty values. Once the stability is determined, the reporting program will notify the user that the calorimeter has reached equilibrium. The Calorimeter Data Acquisition and Reporting Program operates continuously as described to monitor for calorimeter equilibrium and to generate a printable report with sample results.

  8. CALDAR. Calorimeter Data Acquisition and Reporting Software

    SciTech Connect (OSTI)

    Plummer, J.R.; Levi, G.

    1998-07-20

    The calorimeter Data Acquisition and Reporting Program performs the calculations necessary to calculate the calorimetric sample results in grams and provide a printable report for up to twelve Mound Calorimeters. To determine a standard`s wattage or sample gram fill, the reporting program retrieves the output voltage from the power supply at the calorimeter and a temperature resistant resistor via a voltmeter and digital input card in a Hewlett Packard Data Acquisition Unit (DAQ). From the retrieved voltage data, the reporting program can calculate a standard`s wattage output and sample gram fill. The reporting program also determines equilibrium (stability) by performing a stability algorithm bassed on user defined slope an/or sigma values for the previous forty values. Once the stability is determined, the reporting program will notify the user that the calorimeter has reached equilibrium. The Calorimeter Data Acquisition and Reporting Program operates continuously as described to monitor for calorimeter equilibrium and to generate a printable report with sample results.

  9. National Ignition Facility project acquisition plan

    SciTech Connect (OSTI)

    Callaghan, R.W.

    1996-04-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.

  10. Calorimeter Data Acquisition and Reporting Software

    Energy Science and Technology Software Center (OSTI)

    1998-08-27

    The calorimeter Data Acquisition and Reporting Program performs the calculations necessary to calculate the calorimetric sample results in grams and provide a printable report for up to twelve Mound Calorimeters. To determine a standard''s wattage or sample gram fill, the reporting program retrieves the output voltage from the power supply at the calorimeter and a temperature resistant resistor via a voltmeter and digital input card in a Hewlett Packard Data Acquisition Unit (DAQ). From themore » retrieved voltage data, the reporting program can calculate a standard''s wattage output and sample gram fill. The reporting program also determines equilibrium (stability) by performing a stability algorithm bassed on user defined slope an/or sigma values for the previous forty values. Once the stability is determined, the reporting program will notify the user that the calorimeter has reached equilibrium. The Calorimeter Data Acquisition and Reporting Program operates continuously as described to monitor for calorimeter equilibrium and to generate a printable report with sample results.« less

  11. DOE Acquisition Outlook and Challenges | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Outlook and Challenges DOE Acquisition Outlook and Challenges Presentation from the 2015 DOE National Cleanup Workshop by John Hale, Director, Office of Small And Disadvantaged Business Utilization. DOE Acquisition Outlook and Challenges (489.45 KB) More Documents & Publications DOE-National-Cleanup-Workshop-Outlook-and-Challenges-John-Hale-III Webinar Presentation: Doing Business with Us Small Business Webinar: March 7 2013

  12. Publication of Federal Acquisition Circular 2005-50

    Broader source: Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-50 which makes miscellaneous changes to the Federal Acquisition Regulation. We are reviewing Item II for possible changes we may need to make in DOE Acquisition Guide Chapter 38.

  13. Superconductivity and magnetism in rapidly solidified perovskites

    SciTech Connect (OSTI)

    O'Handley, R.C.; Kalonji, G.

    1991-01-01

    The report is divided into six parts, reflecting major thrusts of our work since 1987. The six areas are: molecular orbital theory of high {Tc} superconductivity; rapid solidification processing of oxide superconductors; time dependent magnetic and superconducting properties of these inhomogeneous materials; excess Gd in Gd{sub 1+x}Ba{sub 2-x}Cu{sub 3}O{sub 7-{delta}} perovskites; rapid solidification and directional annealing to achieve high Jc; and Mossbauer studies of T = Fe, Co and Ni site selection in YBa{sub 2}(CuT){sub 3}O{sub 7-{delta}} and GdBa{sub 2}(CuT){sub 3}O{sub 7-{delta}}.

  14. RAPID MAPPING TOOL: AN ARCMAP EXTENSION

    SciTech Connect (OSTI)

    STEVE P. LINGER; PAUL M. RICH; DOUG WALTHER; MARC S. WITKOWSKI; MARCIA A. JONES; HARI S. KHALSA

    2002-06-18

    Cartographic production laboratories produce large volumes of maps for diverse customers. Turnaround time and consistency are key concerns. The Rapid Mapping Tool is an ArcMap based tool that enables rapid creation of maps to meet customer needs. This tool was constructed using VB/VBA, ArcObjects, and ArcGIS templates. The core capability of ArcMap is extended for custom map production by storing specifications associated with a map or template in a companion XML document. These specifications include settings and preferences used to create custom maps. The tool was developed as a component of an enterprise GIS, which enables spatial data management and delivery using ArcSDE, ArcIMS, Oracle, and a web-based request tracking system.

  15. Floating data acquisition system for microwave calorimeter measurements on MTX

    SciTech Connect (OSTI)

    Sewall, N.R.; Meassick, S. )

    1989-09-13

    A microwave calorimeter has been designed for making 140-GHz absorption measurements on the MTX. Measurement of the intensity and spatial distribution of the FEL-generated microwave beam on the inner wall will indicate the absorption characteristics of the plasma when heated with a 140 GHz FEL pulse. The calorimeter works by monitoring changes of temperature in silicon carbide tiles located on the inner wall of the tokamak. Thermistors are used to measure the temperature of each tile. The tiles are located inside the tokamak about 1 cm outside of the limiter radius at machine potential. The success of this measurement depends on our ability to float the data acquisition system near machine potential and isolate it from the rest of the vault ground system. Our data acquisition system has 48 channels of thermistor signal conditioning, a multiplexer and digitizer section, a serial data formatter, and a fiber-optic transmitter to send the data out. Additionally, we bring timing signals to the interface through optical fibers to tell it when to begin measurement, while maintaining isolation. The receiver is an HP 200 series computer with a serial data interface; the computer provides storage and local display for the shot temperature profile. Additionally, the computer provides temporary storage of the data until it can be passed to a shared resource management system for archiving. 2 refs., 6 figs.

  16. Federal Acquisition Regulation Federal Acquisition Circular 2005-86 Summary of Rules

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Regulation Federal Acquisition Circular 2005-86 Summary of Rules FAC 2005-86 Item Subject FAR Case I Definition of "Multiple-Award Contract" 2015-019 II Sole Source Contracts for Women-Owned Small Businesses (Interim) 2015-032 III New Designated Countries-Montenegro and New Zealand 2015-034 IV Trade Agreements Threshold 2016-001 Item I- Definition of "Multiple-Award Contract" (FAR Case 2015-019) This final rule amends the FAR to define ''multiple-award contract.''

  17. Policy Flash 2014-20 / Acquisition Letter 2014-05 / Financial...

    Energy Savers [EERE]

    0 Acquisition Letter 2014-05 Financial Acquisition Letter 2014-02 Policy Flash 2014-20 Acquisition Letter 2014-05 Financial Acquisition Letter 2014-02 DATE: March 10, 2014...

  18. Policy Flash 2014-20 / Acquisition Letter 2014-05 / Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Acquisition Letter 2014-05 Financial Acquisition Letter 2014-02 Policy Flash 2014-20 Acquisition Letter 2014-05 Financial Acquisition Letter 2014-02 DATE: March 10, 2014 ...

  19. Federal Acquisition Circular (FAC) 2005-72

    Office of Energy Efficiency and Renewable Energy (EERE)

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the December 31, 2014 Federal Register at 78 FR 80368. This FAC issued 4 final rules. Please note that the final rule on Service Contracts Reporting Requirements is applicable to solicitations issued and contracts awarded on or after January 30, 2014. Contracting officers will modify existing indefinite-delivery contracts, on a bilateral basis in accordance with FAR 1.108(d)(3), within six months of the effective date of the final rule, if the remaining period of performance extends beyond October 1, 2013, and $2.5 million or more remains to be obligated.

  20. Rapid determination of actinides in seawater samples

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Maxwell, Sherrod L.; Culligan, Brian K.; Hutchison, Jay B.; Utsey, Robin C.; McAlister, Daniel R.

    2014-03-09

    A new rapid method for the determination of actinides in seawater samples has been developed at the Savannah River National Laboratory. The actinides can be measured by alpha spectrometry or inductively-coupled plasma mass spectrometry. The new method employs novel pre-concentration steps to collect the actinide isotopes quickly from 80 L or more of seawater. Actinides are co-precipitated using an iron hydroxide co-precipitation step enhanced with Ti+3 reductant, followed by lanthanum fluoride co-precipitation. Stacked TEVA Resin and TRU Resin cartridges are used to rapidly separate Pu, U, and Np isotopes from seawater samples. TEVA Resin and DGA Resin were used tomore » separate and measure Pu, Am and Cm isotopes in seawater volumes up to 80 L. This robust method is ideal for emergency seawater samples following a radiological incident. It can also be used, however, for the routine analysis of seawater samples for oceanographic studies to enhance efficiency and productivity. In contrast, many current methods to determine actinides in seawater can take 1–2 weeks and provide chemical yields of ~30–60 %. This new sample preparation method can be performed in 4–8 h with tracer yields of ~85–95 %. By employing a rapid, robust sample preparation method with high chemical yields, less seawater is needed to achieve lower or comparable detection limits for actinide isotopes with less time and effort.« less

  1. Rapid Toolkit Stakeholder Trial Demonstration

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Regulatory and Permitting Information Desktop (RAPID) Toolkit offers one location for agencies, developers, and industry stakeholders to work together on state and federal hydropower regulatory processes by using a wiki environment to share permitting guidance, regulations, contacts, and other relevant information.

  2. RAPID/Tools | Open Energy Information

    Open Energy Info (EERE)

    RAPIDTools < RAPID(Redirected from RAPIDResources) Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal...

  3. Connecticut's Health Impact Study Rapidly Increasing Weatherization...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Connecticut's Health Impact Study Rapidly Increasing Weatherization Efforts Connecticut's Health Impact Study Rapidly Increasing Weatherization Efforts June 18, 2014 - 10:49am ...

  4. PROJECT PROFILE: Rapid Development of Disruptive Photovoltaic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rapid Development of Disruptive Photovoltaic Technologies PROJECT PROFILE: Rapid Development of Disruptive Photovoltaic Technologies Funding Opportunity: SuNLaMP SunShot ...

  5. RAPID/Hydropower | Open Energy Information

    Open Energy Info (EERE)

    Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History RAPIDHydropower < RAPID Jump to: navigation, search RAPID Regulatory and Permitting Information...

  6. Cedar Rapids Wind Project | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Name Cedar Rapids Wind Project Facility Cedar Rapids Sector Wind energy Facility Type Community Wind Location NE Coordinates 41.562199, -98.148048...

  7. RAPID/Roadmap/11 | Open Energy Information

    Open Energy Info (EERE)

    Roadmap11 < RAPID | Roadmap Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar...

  8. RAPID/Roadmap/6 | Open Energy Information

    Open Energy Info (EERE)

    Roadmap6 < RAPID | Roadmap Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar...

  9. RAPID/Roadmap/4 | Open Energy Information

    Open Energy Info (EERE)

    RAPIDRoadmap4 < RAPID | Roadmap Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower...

  10. RAPID/Roadmap/19 | Open Energy Information

    Open Energy Info (EERE)

    RAPIDRoadmap19 < RAPID | Roadmap Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower...

  11. RAPID/Roadmap/20 | Open Energy Information

    Open Energy Info (EERE)

    RAPIDRoadmap20 < RAPID | Roadmap Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower...

  12. RAPID/Roadmap/13 | Open Energy Information

    Open Energy Info (EERE)

    RAPIDRoadmap13 < RAPID | Roadmap Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower...

  13. Functionalized Polyacrylamide Monolith for Rapid Bacteria Pathogen...

    Office of Scientific and Technical Information (OSTI)

    for Rapid Bacteria Pathogen Detection in Human Blood. Citation Details In-Document Search Title: Functionalized Polyacrylamide Monolith for Rapid Bacteria Pathogen ...

  14. Template:RAPID-Breadcrumb | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Description Template:RAPID-Breadcrumb is used to generate the top level breadcrumb trail for select RAPID Toolkit pages. Usage To call...

  15. RAPID/Overview | Open Energy Information

    Open Energy Info (EERE)

    RAPIDOverview < RAPID(Redirected from RAPIDAtlas) Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal...

  16. RAPID/Contact | Open Energy Information

    Open Energy Info (EERE)

    Contact < RAPID Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute...

  17. RAPID/Tools | Open Energy Information

    Open Energy Info (EERE)

    Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History RAPIDTools < RAPID Jump to: navigation, search RAPID Regulatory and Permitting Information...

  18. RAPID/Best Practices/ | Open Energy Information

    Open Energy Info (EERE)

    < RAPID | Best Practices Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools...

  19. RAPID/Geothermal/Roadmap | Open Energy Information

    Open Energy Info (EERE)

    Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History RAPIDGeothermalRoadmap < RAPID | Geothermal Jump to: navigation, search RAPID Regulatory...

  20. RAPID/Geothermal | Open Energy Information

    Open Energy Info (EERE)

    Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History RAPIDGeothermal < RAPID(Redirected from RAPIDRoadmapGeo) Jump to: navigation, search RAPID...

  1. RAPID/Geothermal/Roadmap | Open Energy Information

    Open Energy Info (EERE)

    RAPIDGeothermalRoadmap < RAPID | Geothermal(Redirected from RAPIDRoadmapGeoSections) Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit...

  2. Bagless Transfer System Welder Data Acquisition Software

    Energy Science and Technology Software Center (OSTI)

    2003-09-30

    The Bagless Transfer System Welder Data Acquisition Software (BTS DAS) was developed by SRTC to replace a strip chart recorder that has been in place since the design of the BTS. During the welding process, critical weld parameters such as weld current and voltage, can give valuable information about the weld. In the past, weld data from the TID welding process, has been monitored using strip chart recorders. The data from the weld process, recordedmore » on the strip chart recorder traces, are reviewed to analyze the weld. The BTS DAS improves this technology by digitizing the weld data which allows for automation of the analysis process. Also, the data files are now stored digitally as well as a hard copy printout, so they can be reanalyzed if needed. The BTS DAS performs the necessary functions to perform the data acquisition functions during the BTS Welding Process. It is important to monitor the critical weld parameters, current and voltage, during a weld as they can be used to set acceptance criteria for weld acceptance. The software monitors and records the weld current, voltage, and RPM data. The welder DAS is a passive device and does not control the welder. The BTS control system interfaces directly with the welder and the BTS DAS. Digital handshaking is used between the BTS DAS and the BTS control system to ensure that the DAS is ready to weld prior to allowing the operator to initiate the welding process.« less

  3. 37pt.2PerformanceBasedServiceAcquisition.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7pt.2PerformanceBasedServiceAcquisition.pdf 37pt.2PerformanceBasedServiceAcquisition.pdf (1022.17 KB) More Documents & Publications Acquisitions___Communications.pdf Acquisition Guide Chapter 7.1 - Acquisition Planning One Acquisition Solution for Integrated Services (OASIS) - Brad DeMers, General Services Administration (GSA)

  4. Performance of a VME-based parallel processing LIDAR data acquisition system (summary)

    SciTech Connect (OSTI)

    Moore, K.; Buttler, B.; Caffrey, M.; Soriano, C.

    1995-05-01

    It may be possible to make accurate real time, autonomous, 2 and 3 dimensional wind measurements remotely with an elastic backscatter Light Detection and Ranging (LIDAR) system by incorporating digital parallel processing hardware into the data acquisition system. In this paper, we report the performance of a commercially available digital parallel processing system in implementing the maximum correlation technique for wind sensing using actual LIDAR data. Timing and numerical accuracy are benchmarked against a standard microprocessor impementation.

  5. Rapid Production of Methane Hydrates | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rapid Production of Methane Hydrates NETL Develops a Method for Rapidly Producing Methane Hydrates Natural gas, which is predominantly methane, is recognized as clean burning and an important bridge fuel to a future where renewable energy sources are more common. Natural gas currently accounts for nearly a quarter of the U.S. energy supply, and that share is expected to remain roughly constant over the next several decades. Energy demand during this time period is expected to continue growing,

  6. Spectrotemporal CT data acquisition and reconstruction at low dose

    SciTech Connect (OSTI)

    Clark, Darin P.; Badea, Cristian T.; Lee, Chang-Lung; Kirsch, David G.

    2015-11-15

    Purpose: X-ray computed tomography (CT) is widely used, both clinically and preclinically, for fast, high-resolution anatomic imaging; however, compelling opportunities exist to expand its use in functional imaging applications. For instance, spectral information combined with nanoparticle contrast agents enables quantification of tissue perfusion levels, while temporal information details cardiac and respiratory dynamics. The authors propose and demonstrate a projection acquisition and reconstruction strategy for 5D CT (3D + dual energy + time) which recovers spectral and temporal information without substantially increasing radiation dose or sampling time relative to anatomic imaging protocols. Methods: The authors approach the 5D reconstruction problem within the framework of low-rank and sparse matrix decomposition. Unlike previous work on rank-sparsity constrained CT reconstruction, the authors establish an explicit rank-sparse signal model to describe the spectral and temporal dimensions. The spectral dimension is represented as a well-sampled time and energy averaged image plus regularly undersampled principal components describing the spectral contrast. The temporal dimension is represented as the same time and energy averaged reconstruction plus contiguous, spatially sparse, and irregularly sampled temporal contrast images. Using a nonlinear, image domain filtration approach, the authors refer to as rank-sparse kernel regression, the authors transfer image structure from the well-sampled time and energy averaged reconstruction to the spectral and temporal contrast images. This regularization strategy strictly constrains the reconstruction problem while approximately separating the temporal and spectral dimensions. Separability results in a highly compressed representation for the 5D data in which projections are shared between the temporal and spectral reconstruction subproblems, enabling substantial undersampling. The authors solved the 5D reconstruction

  7. Rapid synthesis of beta zeolites

    DOE Patents [OSTI]

    Fan, Wei; Chang, Chun -Chih; Dornath, Paul; Wang, Zhuopeng

    2015-08-18

    The invention provides methods for rapidly synthesizing heteroatom containing zeolites including Sn-Beta, Si-Beta, Ti-Beta, Zr-Beta and Fe-Beta. The methods for synthesizing heteroatom zeolites include using well-crystalline zeolite crystals as seeds and using a fluoride-free, caustic medium in a seeded dry-gel conversion method. The Beta zeolite catalysts made by the methods of the invention catalyze both isomerization and dehydration reactions.

  8. Acquisition Letter No. AL 2015-09 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Acquisition Letter No. AL 2015-09 DATE: August 25, 2015 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Deputy Secretary Memorandum entitled "Updated Guidance on Conference-Related Activities and Spending. SUMMARY: Acquisition Letter (AL) 2015-09 has been issued to transmit the subject memorandum of the Deputy Secretary. The memorandum contains a model H

  9. Acquisition Planning--Extending A Management and Operating Contract Without

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Full and Open Competition; and Site and Utilization Management Planning | Department of Energy Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning PF2009-13.pdf (337.25 KB) PF2009-13a - Acquisition Letter 2009-03 - Acquisition Planning (130.37 KB) More Documents

  10. Acquisition Guide, Chapter 42.15, Contractor Performance Information

    Broader source: Energy.gov [DOE]

    The subject Acquisition Guide Chapter has been updated to make revisions to the Contractor Performance Assessment Reporting System (CPARS) guidance and includes incorporating Federal Acquisition Regulation (FAR) changes through Federal Acquisition Circular (FAC) 2005-66. Since the CPARS guide and related user manuals include civilian agency guidance, this chapter has been revised to reference the CPARS website and guidance, as well as removing outdated and duplicative guidance.

  11. Acquisition Guide Chapter 33.214 - Alternative Dispute Resolution |

    Office of Environmental Management (EM)

    Department of Energy 3.214 - Alternative Dispute Resolution Acquisition Guide Chapter 33.214 - Alternative Dispute Resolution DATE: August 25, 2016 TO: Procurement Directors/Contracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Guide Chapter 33.214, Alternative Dispute Resolution SUMMARY: The subject guide chapter has been revised to add a paragraph pertaining to clause DOE-H-2033 Alternative

  12. Acquisition Guide Chapter 43.3 | Department of Energy

    Office of Environmental Management (EM)

    Energy 2.1202 - Novation Agreements Acquisition Guide Chapter 42.1202 - Novation Agreements DATE: August 25, 2016 TO: Procurement Directors/Contracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Guide Chapter 42.1202, Novation Agreements SUMMARY: The subject guide chapter has been revised to change the chapter number from 42.3 to 42.1202 to align with the FAR, update references, and make

  13. Acquisition Guide Chapter 42.1202 - Novation Agreements | Department of

    Energy Savers [EERE]

    Energy 2.1202 - Novation Agreements Acquisition Guide Chapter 42.1202 - Novation Agreements DATE: August 25, 2016 TO: Procurement Directors/Contracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Guide Chapter 42.1202, Novation Agreements SUMMARY: The subject guide chapter has been revised to change the chapter number from 42.3 to 42.1202 to align with the FAR, update references, and make

  14. Program and Project Management for the Acquisition of Capital Assets -

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Directives, Delegations, and Requirements B, Program and Project Management for the Acquisition of Capital Assets by Jay Glascock Functional areas: Acquisition, Defense Nuclear Facility Safety and Health Requirement, Program Management The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of

  15. Acquisition Guide, Chapter 6.1, Competition Requirements | Department of

    Office of Environmental Management (EM)

    Energy Guide, Chapter 6.1, Competition Requirements Acquisition Guide, Chapter 6.1, Competition Requirements PF2009-37.pdf (522.49 KB) PF2009-37a - Attachment-Acquisition Guide, Chapter 6.1, Competition Requirements (218.5 KB) (319.48 KB) More Documents & Publications Microsoft Word - AG Chapter 6 1 Nov 2010 Competition Requirements Update of Acquisition Guide Chapter 6.1, "Competition Requirements"

  16. Acquisition Guide, Chapter 42.15, Contractor Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE)

    The subject Acquisition Guide Chapter has been updated to make revisions to the Contractor Performance Assessment Reporting System guidance and includes incorporating Federal Acquisition Regulation (FAR) changes through Federal Acquisition Circular (FAC) 2005-46. Most significant revisions are the change in the reporting thresholds for awards issued on or after October 1, 2010, and additional information on registering a contract or order either manually or auto register.

  17. Department of Energy Acquisition Regulation (DEAR) Final Rule for changes

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Parts 908, 945, 952, and 970 regarding Government Property | Department of Energy Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, 945, 952, and 970 regarding Government Property Department of Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, 945, 952, and 970 regarding Government Property Department of Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, 945, 952, and 970 regarding Government Property was published

  18. Acquisition Letter No. AL 2009-01 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    For National Nuclear Security Administration (NNSA) contracts, contact Mr. Stephen Law, Office of Acquisition and Supply Management, NA-63, at (202) 586-4321 or at...

  19. Acquisition Certifications Program Handbook 3rd Edition released

    Broader source: Energy.gov [DOE]

    The Acquisition Certifications Program Handbook 3rd Edition is revised to reorganize content, incorporate all Policy Flashes related to certifications, and update requirements information for certifications.

  20. Acquisition Letter No. AL 2012-09 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    09 Acquisition Letter No. AL 2012-09 DATE: June 22, 2012 TO: Procurement DirectorsContracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of...

  1. ,"Texas Dry Natural Gas Reserves Acquisitions (Billion Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    ,"Worksheet Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","Texas Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet)",1,"Annual",2013 ,"Release...

  2. Helix Wind Inc formerly ClearView Acquisitions | Open Energy...

    Open Energy Info (EERE)

    (formerly ClearView Acquisitions) Place: San Diego, California Zip: 92113 Sector: Wind energy Product: California-based manufacturer of small scale wind turbines. References: Helix...

  3. GSA Office of Governmentwide Policy CIVILIAN AGENCY ACQUISITION...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    N AG THER THAN NASA FROM: -LAURAAULETTA CHAIR CIVILIAN AGENCY ACQUISITION COUNCIL (CAAC) ... This CAAC memorandum constitutes consultation with the Chair of the CAAC required by FAR ...

  4. Acquisition Letter/Financial Assistance Letter (ALIFAL) 201 0...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    With Internet Protocol Version 6 (IPv6) Acquisition LetterFinancial Assistance Letter (ALIFAL) 201 0-06, Acquiring Information Technology, Requirement to Comply With Internet ...

  5. Acquisition Letter No. AL 2008-02 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Part 7 Acquisition Planning FAR Part 15 Contracting by Negotiation FAR Part 30 Cost Accounting Standards Administration FAR Part 31 Contract Cost Principles and Procedures FAR...

  6. Data Acquisition-Manipulation At Walker-Lane Transitional Zone...

    Open Energy Info (EERE)

    (Coolbaugh, Et Al., 2005 - 2) Exploration Activity Details Location Walker-Lane Transition Zone Geothermal Region Exploration Technique Data Acquisition-Manipulation Activity...

  7. Acquisition Letter 07 - Benchmark Compensation Amount for Individual...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Compensation Amount for Individual Executive Salary Actions Acquisition Letter 07 - Benchmark Compensation Amount for Individual Executive Salary Actions The purpose of ...

  8. Delegation of Acquisition Executive Authority for Capital Asset...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Idaho Cleanup Project by cooper DelegationAcquisitionExecAuthorityCapitalAssetProjectsIDCleanupProject-CooperEM.pdf -- PDF Document, 256 KB ID: NA Type: Organizations' Assignment...

  9. Federal Acquisition Circular 2005-38 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    38 Federal Acquisition Circular 2005-38 Federal Acquisition Circular 2005-3 8, which makes miscellaneous changes to the Federal Acquisition Regulation (FAR), was published in the December 10, 2009 issue of the Federal Register. A summary of the changes is attached. Due to the publication of two rules item I11 and item V, additional guidance is provided in this flash. PF2010-18 Policy PF 2010-18 Federal Acquisition Circular 2005-38 (117.76 KB) PF2010-18a.pdf (117.46 KB) More Documents &

  10. Acquisition Letter No. AL 2012-05 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    and Project Management SUBJECT: Reissuance of Acquisition Letter on Meal Costs in Management and Operation Contracts SUMMARY: This AL is a reissuance (under the new AL...

  11. Acquisition Letter No. AL 2012-10 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at Nancy.Harvey@hq.doe.gov. Attachment PDF icon AL...

  12. Attached is Policy Flash 2013-44 Acquisition Guide- Allowability...

    Broader source: Energy.gov (indexed) [DOE]

    44 Acquisition Guide- Allowability of Incurred Costs Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy...

  13. Acquisition Guide Chapter 1.2 - Balanced Scorecard Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 - Balanced Scorecard Performance Assessment Program - (March 2004) Acquisition Guide Chapter 1.2 - Balanced Scorecard Performance Assessment Program - (March 2004) This chapter ...

  14. Policy Flash 2013-54 Acquisition Certification Program Handbook...

    Broader source: Energy.gov (indexed) [DOE]

    Acquisition Certifications Program Handbook 4th Edition Questions concerning this policy flash should be directed to Linda Ott of the Office Acquistion and Project Management,...

  15. Policy Flash 2013-23 Department of Energy Acquisition Regulation...

    Broader source: Energy.gov (indexed) [DOE]

    Attached is Policy Flash 2013-23 Department of Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, 945, 952, and 970 regarding Government Property. Questions...

  16. Revised DOE Acquisition Guide Chapter 71.1 Headquarters Business...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    71.1 Headquarters Business Clearance Process Revised DOE Acquisition Guide Chapter 71.1 Headquarters Business Clearance Process There was mention in the National Academy of Public ...

  17. Data Acquisition-Manipulation At Valley Of Ten Thousand Smokes...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Valley Of Ten Thousand Smokes Region Area (Kodosky & Keith,...

  18. Data Acquisition-Manipulation At Northern Basin & Range Region...

    Open Energy Info (EERE)

    - 2) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Northern Basin & Range Region (Coolbaugh, Et Al., 2005 - 2)...

  19. Data Acquisition-Manipulation At San Francisco Volcanic Field...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At San Francisco Volcanic Field Area (Warpinski, Et Al., 2004)...

  20. Data Acquisition-Manipulation At Central Nevada Seismic Zone...

    Open Energy Info (EERE)

    - 2) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Central Nevada Seismic Zone Region (Coolbaugh, Et Al., 2005...

  1. Data Acquisition-Manipulation At General Us Region (Blackwell...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At General Us Region (Blackwell & Richards, 2004) Exploration...

  2. Data Acquisition-Manipulation At Coso Geothermal Area (1980)...

    Open Energy Info (EERE)

    80) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Coso Geothermal Area (1980) Exploration Activity Details...

  3. Data Acquisition-Manipulation At Socorro Mountain Area (Kooten...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Socorro Mountain Area (Kooten, 1987) Exploration Activity...

  4. Data Acquisition-Manipulation At Lake City Hot Springs Area ...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Lake City Hot Springs Area (Warpinski, Et Al., 2004)...

  5. Data Acquisition-Manipulation At General Us Region (Blackwell...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At General Us Region (Blackwell, Et Al., 2000) Exploration...

  6. Data Acquisition-Manipulation At Chena Area (Erkan, Et. Al.,...

    Open Energy Info (EERE)

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Chena Area (Erkan, Et. Al., 2008) Exploration Activity...

  7. Data Acquisition-Manipulation At Nw Basin & Range Region (Coolbaugh...

    Open Energy Info (EERE)

    - 2) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Nw Basin & Range Region (Coolbaugh, Et Al., 2005 - 2)...

  8. Golden Reading Room: Office of Acquisition Documents, Better...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Golden Reading Room: Office of Acquisition Documents, Better Buildings Initiative Support Services Below are electronic versions of Golden Field Office Reading Room documents that ...

  9. Golden Reading Room: Office of Acquisition Documents, Sole of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Golden Reading Room: Office of Acquisition Documents, Sole of Limited Source Justifications Below are electronic versions of Golden Field Office Reading Room documents that were ...

  10. Unique Hardware and Software Data Acquisition and Processing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hardware and Software Data Acquisition and Processing Solutions in a Small Engine Test Cell for Enhanced Kinetic Engine Modeling Accuracy Unique Hardware and Software Data ...

  11. Policy Flash 2013-25 Acquisition Certifications Program Handbook...

    Broader source: Energy.gov (indexed) [DOE]

    downloadsacquisition-certifications-program-handbook Questions concerning this policy flash should be directed to Linda Ott of the Office of Acquisition and Project...

  12. Policy Flash 2014-11 Federal Acquisition Circular (FAC) 2005...

    Broader source: Energy.gov (indexed) [DOE]

    Questions concerning this policy flash should be directed to Barbara Binney, of the Office of Acquisition and Project Management Policy at (202) 287-1340 or at...

  13. Acquisition Guide Chapter 43.1, Contract Modifications

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Policy Flash transmits the new Acquisition Guide Chapter 43.1, Contract Modifications, which provides a consistent approach for processing and executing modifications.

  14. Acquisition Planning--Extending A Management and Operating Contract...

    Energy Savers [EERE]

    Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning Acquisition Planning--Extending A Management and Operating Contract Without ...

  15. Deputy Assistant Secretary for Acquisition and Project Management

    Office of Environmental Management (EM)

    United States Department of Energy Contract Management by the Department of Energy's ... (EM) acquisitions and of contract and project management reforms that EM is implementing. ...

  16. Prioritizing Acquisition Pathways in the State Level Concept...

    Office of Scientific and Technical Information (OSTI)

    Prioritizing Acquisition Pathways in the State Level Concept Citation Details In-Document ... Sponsoring Org: DOELANL Country of Publication: United States Language: English Subject: ...

  17. Test Plan for Solvent Extraction Data Acquisition to Support...

    Office of Scientific and Technical Information (OSTI)

    ... Country of Publication: United States Language: English Subject: 11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; ACTINIDES; AQUEOUS SOLUTIONS; CAMERAS; COALESCENCE; DATA ACQUISITION; ...

  18. Test Plan for Solvent Extraction Data Acquisition to Support...

    Office of Scientific and Technical Information (OSTI)

    Country of Publication: United States Language: English Subject: 11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; ACTINIDES; AQUEOUS SOLUTIONS; CAMERAS; COALESCENCE; DATA ACQUISITION; ...

  19. Status Report: EM Acquisition and Project Management Review

    Office of Environmental Management (EM)

    ... the contractor community for EM to publish an overall acquisition strategy, without compromising confidential or procurement-sensitive information, thereby issuing advanced notice.

  20. ,"New Mexico Dry Natural Gas Reserves Acquisitions (Billion Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","New Mexico Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet)",1,"Annual",2013 ,"Release...

  1. EM Cares About Small Businesses, Acquisition Chief Says at Conference

    Broader source: Energy.gov [DOE]

    PHOENIX – EM is realizing success in setting aside and awarding significant work to small businesses, EM’s acquisition chief said here earlier this month.

  2. Acquisition Letter No. AL 2013-06 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Division F, Title I, Title II, and Title ...

  3. Acquisition Letter No. AL 2013-02 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Implementation of Indian Energy Preference ...

  4. Revised Acquisition Guide Chapter 42.5, Contract Management Planning

    Broader source: Energy.gov (indexed) [DOE]

    policyguidancepolicyflashes.htm. Questions concerning the revised Acquisition Guide chapter may be addressed to Mike Larson at (202) 287-1426 or Michael.Larson@hq.doe.gov....

  5. Acquisition Letter on Contractor Domestic Extended Personnel Assignments

    Broader source: Energy.gov [DOE]

    The attached Acquisition Letter has been issued to provide guidance on the Department's policy governing reimbursement of costs associated with contractor domestic extended personnel assignments.

  6. Mr. Robert C, Smith Federal Acquisition Service General Services...

    Broader source: Energy.gov (indexed) [DOE]

    Robert C, Smith Federal Acquisition Service General Services Administration 2200 Crystal Drive, Suite 300 Arlington, VA 20406 Dear Mr. Smith: The Department of Energy (DOE) will ...

  7. Single transmission line data acquisition system

    DOE Patents [OSTI]

    Fasching, George E.

    1984-01-01

    A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensors monitor specific process variables and transmit measurement values over the single transmission line to a master station when addressed by the master station. Power for all remote stations (up to 980) is provided by driving the line with constant voltage supplied from the master station and automatically maintained independent of the number of remote stations directly connected to the line. The transmission line can be an RG-62 coaxial cable with lengths up to about 10,000 feet with branches up to 500 feet. The remote stations can be attached randomly along the line. The remote stations can be scanned at rates up to 980 channels/second.

  8. Bulk-memory processor for data acquisition

    SciTech Connect (OSTI)

    Nelson, R.O.; McMillan, D.E.; Sunier, J.W.; Meier, M.; Poore, R.V.

    1981-01-01

    To meet the diverse needs and data rate requirements at the Van de Graaff and Weapons Neutron Research (WNR) facilities, a bulk memory system has been implemented which includes a fast and flexible processor. This bulk memory processor (BMP) utilizes bit slice and microcode techniques and features a 24 bit wide internal architecture allowing direct addressing of up to 16 megawords of memory and histogramming up to 16 million counts per channel without overflow. The BMP is interfaced to the MOSTEK MK 8000 bulk memory system and to the standard MODCOMP computer I/O bus. Coding for the BMP both at the microcode level and with macro instructions is supported. The generalized data acquisition system has been extended to support the BMP in a manner transparent to the user.

  9. Multiple channel optical data acquisition system

    DOE Patents [OSTI]

    Fasching, G.E.; Goff, D.R.

    1985-02-22

    A multiple channel optical data acquisition system is provided in which a plurality of remote sensors monitoring specific process variable are interrogated by means of a single optical fiber connecting the remote station/sensors to a base station. The remote station/sensors derive all power from light transmitted through the fiber from the base station. Each station/sensor is individually accessed by means of a light modulated address code sent over the fiber. The remote station/sensors use a single light emitting diode to both send and receive light signals to communicate with the base station and provide power for the remote station. The system described can power at least 100 remote station/sensors over an optical fiber one mile in length.

  10. Supercritical Water Oxidation Data Acquisition Testing

    SciTech Connect (OSTI)

    K. M. Garcia

    1996-08-01

    Supercritical Water Oxidation (SCWO) is a high pressure oxidation process that blends air, water, and organic waste material in an oxidizer in which where the temperature and pressure in the oxidizer are maintained above the critical point of water. Supercritical water mixed with hydrocarbons, which would be insoluble at subcritical conditions, forms a homogeneous phase which possesses properties associated with both a gas and a liquid. Hydrocarbons in contact with oxygen and SCW are readily oxidized. These properties of SCW make it an attractive means for the destruction of waste streams containing organic materials. SCWO technology holds great promise for treating mixed wastes in an environmentally safe and efficient manner. In the spring of 1994 the U.S. Department of Energy (DOE) initiated a Supercritical Water Oxidation Data Acquisition Testing (SCWODAT) program. The SCWODAT program provided further information and operational data on the effectiveness of treating both simulated mixed waste and typical Navy hazardous waste using the SCWO technology. The program concentrated on the acquisition of data through pilot plant testing. The Phase I DOE testing used a simulated waste stream that contained a complex machine cutting oil and metals, that acted as surrogates for radionuclides. The Phase II Navy testing included pilot testing using hazardous waste materials to demonstrate the effectiveness of the SCWO technology. The SCWODAT program demonstrated that the SCWO process oxidized the simulated waste stream containing complex machine cutting oil, selected by DOE as representative of one of the most difficult of the organic waste streams for which SCWO had been applied. The simulated waste stream with surrogate metals in solution was oxidized, with a high destruction efficiency, on the order of 99.97%, in both the neutralized and unneutralized modes of operation.

  11. Hydropower RAPID Toolkit | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydropower RAPID Toolkit Hydropower RAPID Toolkit Hydropower RAPID Toolkit Providing project permitting process information for hydropower developers. Navigating the complex system of federal and state regulations to secure project approvals can be one of the biggest hurdles hydropower developers face. The U.S. Department of Energy (DOE) Hydropower Regulatory and Permitting Information Desktop (RAPID) Toolkit offers a solution. The Hydropower RAPID Toolkit makes permitting information easily

  12. Acquisition Guide Chapter 17.1 – Interagency Acquisitions, Interagency Transactions, and Interagency Agreements – Minor Revision

    Office of Energy Efficiency and Renewable Energy (EERE)

    Acquisition Guide Chapter 17.1 – Interagency Acquisitions, Interagency transactions, and Interagency Agreements is revised to add under the paragraph C Exclusions that Power Marketing Administration's activities performed under its power marketing authority, policies, and procedures are excluded from this DOE Acquisition Guide Chapter. The revised chapter is attached with this flash. All other attachments from Policy Flash 2012-32 remain the same.

  13. Rapid prototyping: A paradigm shift in investment casting

    SciTech Connect (OSTI)

    Atwood, C.L.; Maguire, M.C.; Baldwin, M.D.; Pardo, B.T.

    1996-09-01

    The quest for fabricating complex metal parts rapidly and with minimal cost has brought rapid prototyping (RP) processes to the forefront of the investment casting industry. Relatively recent advances in DTM Corporation`s selective laser sintering (SLS) and 3D Systems stereolithography (SL) processes have had a significant impact on the overall quality of patterns produced using these rapid prototyping processes. Sandia National Laboratories uses patterns generated from rapid prototyping processes to reduce the cycle time and cost of fabricating prototype and small lot production parts in support of a program called FASTCAST. The SLS process is used to fabricate patterns from materials such as investment casting wax, polycarbonate, and a new material called TrueForm PM{trademark}. With the timely introduction of each of these materials, the quality of patterns fabricated has improved. The development and implementation of SL QuickCast{trademark} software has enabled this process to produce highly accurate patterns for use in investment casting. This paper focuses on the successes with these new pattern materials and the infrastructure required to cast rapid prototyping patterns successfully. In addition, a brief overview of other applications of rapid prototyping at Sandia will be discussed.

  14. Acquisition Guide Chapter 37.601 - Performance-Based Services Acquisition |

    Energy Savers [EERE]

    i Contracting activities and authorized contractor SmartPay participants must supplement these policies and procedures to reflect their specific circumstances, e.g., identify your Organizational Program Coordinator; identify your central receiving office, etc. Revisions must not delete prohibitions or reduce the level of controls required by the Federal Acquisition Regulations, Office of Management and Budget, General Services Administration (GSA) or these DOE Procedures. PURCHASE CARD POLICY

  15. Rapid thermal processing by stamping

    DOE Patents [OSTI]

    Stradins, Pauls; Wang, Qi

    2013-03-05

    A rapid thermal processing device and methods are provided for thermal processing of samples such as semiconductor wafers. The device has components including a stamp (35) having a stamping surface and a heater or cooler (40) to bring it to a selected processing temperature, a sample holder (20) for holding a sample (10) in position for intimate contact with the stamping surface; and positioning components (25) for moving the stamping surface and the stamp (35) in and away from intimate, substantially non-pressured contact. Methods for using and making such devices are also provided. These devices and methods allow inexpensive, efficient, easily controllable thermal processing.

  16. Rapid Prototyping of Patterned Multifunctional Nanostructures

    SciTech Connect (OSTI)

    FAN,HONGYOU; LU,YUNFENG; LOPEZ,GABRIEL P.; BRINKER,C. JEFFREY

    2000-07-18

    The ability to engineer ordered arrays of objects on multiple length scales has potential for applications such as microelectronics, sensors, wave guides, and photonic lattices with tunable band gaps. Since the invention of surfactant templated mesoporous sieves in 1992, great progress has been made in controlling different mesophases in the form of powders, particles, fibers, and films. To date, although there have been several reports of patterned mesostructures, materials prepared have been limited to metal oxides with no specific functionality. For many of the envisioned applications of hierarchical materials in micro-systems, sensors, waveguides, photonics, and electronics, it is necessary to define both form and function on several length scales. In addition, the patterning strategies utilized so far require hours or even days for completion. Such slow processes are inherently difficult to implement in commercial environments. The authors present a series of new methods of producing patterns within seconds. Combining sol-gel chemistry, Evaporation-Induced Self-Assembly (EISA), and rapid prototyping techniques like pen lithography, ink-jet printing, and dip-coating on micro-contact printed substrates, they form hierarchically organized silica structures that exhibit order and function on multiple scales: on the molecular scale, functional organic moieties are positioned on pore surfaces, on the mesoscale, mono-sized pores are organized into 1-, 2-, or 3-dimensional networks, providing size-selective accessibility from the gas or liquid phase, and on the macroscale, 2-dimensional arrays and fluidic or photonic systems may be defined. These rapid patterning techniques establish for the first time a link between computer-aided design and rapid processing of self-assembled nanostructures.

  17. RAPID DETERMINATION OF {sup 210} PO IN WATER SAMPLES

    SciTech Connect (OSTI)

    Maxwell, S.

    2013-05-22

    A new rapid method for the determination of {sup 210}Po in water samples has been developed at the Savannah River National Laboratory (SRNL) that can be used for emergency response or routine water analyses. If a radiological dispersive device (RDD) event or a radiological attack associated with drinking water supplies occurs, there will be an urgent need for rapid analyses of water samples, including drinking water, ground water and other water effluents. Current analytical methods for the assay of {sup 210}Po in water samples have typically involved spontaneous auto-deposition of {sup 210}Po onto silver or other metal disks followed by counting by alpha spectrometry. The auto-deposition times range from 90 minutes to 24 hours or more, at times with yields that may be less than desirable. If sample interferences are present, decreased yields and degraded alpha spectrums can occur due to unpredictable thickening in the deposited layer. Separation methods have focused on the use of Sr Resin?, often in combination with 210Pb analysis. A new rapid method for {sup 210}Po in water samples has been developed at the Savannah River National Laboratory (SRNL) that utilizes a rapid calcium phosphate co-precipitation method, separation using DGA Resin? (N,N,N?,N? tetraoctyldiglycolamide extractant-coated resin, Eichrom Technologies or Triskem-International), followed by rapid microprecipitation of {sup 210}Po using bismuth phosphate for counting by alpha spectrometry. This new method can be performed quickly with excellent removal of interferences, high chemical yields and very good alpha peak resolution, eliminating any potential problems with the alpha source preparation for emergency or routine samples. A rapid sequential separation method to separate {sup 210} Po and actinide isotopes was also developed. This new approach, rapid separation with DGA Resin plus microprecipitation for alpha source preparation, is a significant advance in radiochemistry for the rapid

  18. Rapid starting methanol reactor system

    DOE Patents [OSTI]

    Chludzinski, Paul J.; Dantowitz, Philip; McElroy, James F.

    1984-01-01

    The invention relates to a methanol-to-hydrogen cracking reactor for use with a fuel cell vehicular power plant. The system is particularly designed for rapid start-up of the catalytic methanol cracking reactor after an extended shut-down period, i.e., after the vehicular fuel cell power plant has been inoperative overnight. Rapid system start-up is accomplished by a combination of direct and indirect heating of the cracking catalyst. Initially, liquid methanol is burned with a stoichiometric or slightly lean air mixture in the combustion chamber of the reactor assembly. The hot combustion gas travels down a flue gas chamber in heat exchange relationship with the catalytic cracking chamber transferring heat across the catalyst chamber wall to heat the catalyst indirectly. The combustion gas is then diverted back through the catalyst bed to heat the catalyst pellets directly. When the cracking reactor temperature reaches operating temperature, methanol combustion is stopped and a hot gas valve is switched to route the flue gas overboard, with methanol being fed directly to the catalytic cracking reactor. Thereafter, the burner operates on excess hydrogen from the fuel cells.

  19. Chapter 41 - Acquisition of Utility Services | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    41 - Acquisition of Utility Services Chapter 41 - Acquisition of Utility Services 41.1_Utilities_0.pdf (13.23 KB) More Documents & Publications AcqGuide41pt1.doc&#0; Policy Flash 2016-31 Chapter 41: Utilities

  20. Acquisition Letter No. AL 2014-01 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Acquisition Letter No. AL 2014-01 AL 2014-01.pdf (72.09 KB) More Documents & Publications Acquisition Letter 2014-01: Management and Operating Contractors' Audit Coverage of Cost_Reimbursement Subcontracts Assessment Report: OAI-V-16-03 Assessment Report: OAI-V-16-05