National Library of Energy BETA

Sample records for rain program preliminary

  1. Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program

    Broader source: Energy.gov [DOE]

    Final Report: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program, December 2012.

  2. The role of EPA`s Acid Rain Division in the Ozone Transport Commission`s NOx budget program

    SciTech Connect (OSTI)

    Schary, C.; Culligan, K.

    1997-12-31

    The Ozone Transport Commission`s (OTC) Nitrogen Oxides (NO{sub x}) Budget Program will implement the emissions reduction goal of the 1994 Memorandum of Understanding between its twelve member states and the District of Columbia. The program will achieve its significant NO{sub x} reductions from electric utilities and industrial boilers using a {open_quotes}cap-and-trade{close_quotes} approach modeled after the US Environmental Protection Agency`s sulfur dioxide emissions trading under the Acid Rain Program. The similarity of the two programs has led to the development of an important partnership between the OTC states and EPA`s Acid Rain Division, Over the past two years, Acid Rain Program staff have shared their technical expertise and assisted extensively in the development of the program`s rules. Leveraging the investment EPA made in the systems used to run the Acid Rain Program, the OTC states have asked the Acid Rain Division to administer the data systems for them, and together are working to expand its existing Emissions Tracking System and to modify a clone of the sulfur dioxide Allowance Tracking System, to fulfill the unique requirements of the NO{sub x} Budget Program. This partnership is an important example of the new type of cooperation and sharing of expertise and resources that should develop between EPA and states as they launch multi-state programs to address regional pollution problems that defy a single-state solution.

  3. Allowance trading activity and state regulatory rulings: Evidence from the US Acid Rain Program

    SciTech Connect (OSTI)

    Bailey, E.M.

    1997-12-31

    The US Acid Rain Program is one of the first, and by far the most extensive, applications of a market based approach to pollution control. From the beginning, there has been concern whether utilities would participate in allowance trading, and whether regulatory activity at the state level would further complicate utilities` decision to trade allowances. This paper finds that public utility commission regulation has encouraged allowance trading activity in states with regulatory rulings, but that allowance trading activity has not been limited to states issuing regulations. Until there is evidence suggesting that significant additional cost savings could have been obtained if additional allowance trading activity had occurred in states without regulations or that utilities in states with regulations are still not taking advantage of all cost saving trading opportunities, this analysis suggests that there is little reason to believe that allowance trading activity is impeded by public utility commission regulations.

  4. Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program

    Broader source: Energy.gov [DOE]

    Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program, December 2012.

  5. Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program: Report Appendices

    Broader source: Energy.gov [DOE]

    Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program, December 2012.

  6. Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program

    Broader source: Energy.gov [DOE]

    This document presents the preliminary process and market evaluation of the U.S. Department of Energy’s (DOE) Better Buildings Neighborhood Program (BBNP). The document was prepared in partial fulfillment of a contract with the Lawrence Berkeley National Laboratory to conduct a comprehensive program assessment of BBNP.

  7. The role of the U.S. Clean Coal Technology Program in implementing the objectives of the joint Canada-U.S. acid rain mitigation initiative

    SciTech Connect (OSTI)

    Baldwin, A.L.; Smith, D.N.; Mann, A.W.; McIlvried, H.G.; Russell, D.L. Sr.

    1997-12-31

    The Clean Coal Technology (CCT) Program was initiated by the US Department of Energy (DOE) in part as a response to the 1986 Joint Report of the US and Canadian Special Envoys on Acid Rain, with a particular focus on coal-burning electric power plants. The fist three solicitations of the CCT Program were aimed primarily at mitigating the potential impacts of acid rain. Subsequently, the Clean Air Act Amendments of 1990 established emission reduction targets for SO{sub 2} and No{sub x}, which influenced the goals of the last two CCT Program. This paper provides an overview of the CCT Program and reports the significant results, with emphasis on emissions reduction as well as their impact on ozone formation.

  8. Final Report: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program Funded By: Prepared By: December 28, 2012 PRELIMINARY PROCESS AND MARKET EVALUATION: BETTER BUILDINGS NEIGHBORHOOD PROGRAM RESEARCH INTO ACTION, INC. PO BOX 12312 PORTLAND OR, 97212 WWW.RESEARCHINTOACTION.COM DELIVERY: 3934 NE MARTIN LUTHER KING JR. BLVD., SUITE 300 PORTLAND, OR 97212 (DELIVERY) TELEPHONE: 503.287.9136 FAX: 503.281.7375 CONTACT: JANE S. PETERS, PRESIDENT JANEP@RESEARCHINTOACTION.COM PRELIMINARY

  9. Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appendices Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program Funded By: Prepared By: December 28, 2012 PRELIMINARY PROCESS AND MARKET EVALUATION: BETTER BUILDINGS NEIGHBORHOOD PROGRAM RESEARCH INTO ACTION, INC. PO BOX 12312 PORTLAND OR, 97212 WWW.RESEARCHINTOACTION.COM DELIVERY: 3934 NE MARTIN LUTHER KING JR. BLVD., SUITE 300 PORTLAND, OR 97212 (DELIVERY) TELEPHONE: 503.287.9136 FAX: 503.281.7375 CONTACT: JANE S. PETERS, PRESIDENT JANEP@RESEARCHINTOACTION.COM

  10. National Evaluation of the Weatherization Assistance Program: Preliminary Evaluation Plan for Program Year 2006

    SciTech Connect (OSTI)

    Ternes, Mark P; Schweitzer, Martin; Tonn, Bruce Edward; Schmoyer, Richard L; Eisenberg, Joel Fred

    2007-02-01

    The U.S. Department of Energy's (DOE's) Weatherization Assistance Program was created by Congress in 1976 under Title IV of the Energy Conservation and Production Act. The purpose and scope of the Program as currently stated in the Code of Federal Regulations (CFR) 10CFR 440.1 is 'to increase the energy efficiency of dwellings owned or occupied by low-income persons, reduce their total residential expenditures, and improve their health and safety, especially low-income persons who are particularly vulnerable such as the elderly, persons with disabilities, families with children, high residential energy users, and households with high energy burden' (Code of Federal Regulations, 2005). DOE sponsored a comprehensive evaluation of the Program in the early 1990's to provide policy makers and program implementers with up-to-date and reliable information they needed for effective decision making and cost-effective operations. Oak Ridge National Laboratory (ORNL) managed the five part study which was based primarily on data from Program Year (PY) 1989 and supplemented by data from 1991-92 (Brown, Berry, and Kinney, 1994). In more recent years, ORNL has conducted four metaevaluations of the Program's energy savings using studies conducted by individual states between the years 1990-1996 (Berry, 1997), 1996-1998 (Schweitzer and Berry, 1999), 1993-2002 (Berry and Schweitzer, 2003), and 1993-2005 (Schweitzer, 2005). DOE announced through its Weatherization Program Notice 05-1 (DOE, 2004) that it would undertake a new national evaluation of the Program because the Program that was evaluated comprehensively in the early 1990's is vastly different from the Program of today. The Program has incorporated new funding sources, management principles, audit procedures, and energy-efficiency measures in response to findings and recommendations resulting from the 1989 National Evaluation, the Weatherization Plus strategic planning process, and other federal, state, and local initiatives. For example, the use of computerized audits has increased, cooling and baseload measures have been added, weatherization approaches tailored to the unique construction characteristics of mobile homes have been developed, the weatherization of large multifamily buildings has expanded and become more sophisticated, the flexibility to improve 'energy-related' health and safety has been provided, and leveraging with utilities, other state programs, and owners of large multifamily buildings has increased considerably. The Department of Energy tasked ORNL with planning the new evaluation in light of its experience in conducting the previous national evaluation and the metaevaluations. This preliminary evaluation plan, developed by ORNL, documents how the new national evaluation will be performed. In the remaining portion of this section, the purpose and fundamental questions the evaluation will address are identified and how these questions were derived is discussed.

  11. Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program

    SciTech Connect (OSTI)

    Peters, Jane S.

    2012-12-28

    This report evaluates the progress of the U.S. Department of Energy’s Better Buildings Neighborhood Program.

  12. Preliminary Technical Risk Analysis for the Geothermal Technologies Program

    SciTech Connect (OSTI)

    2009-01-18

    This report explains the goals, methods, and results of a probabilistic analysis of technical risk for a portfolio of R&D projects in the DOE Geothermal Technologies Program (The Program). The analysis is a task by Princeton Energy Resources International, LLC, in support of the National Renewable Energy Laboratory on behalf of the Program. The main challenge in the analysis lies in translating R&D results to a quantitative reflection of technical risk for a key Program metric: levelized cost of energy (LCOE).

  13. Preliminary Technical Risk Analysis for the Geothermal Technologies Program

    SciTech Connect (OSTI)

    McVeigh, J.; Cohen, J.; Vorum, M.; Porro, G.; Nix, G.

    2007-03-01

    This report explains the goals, methods, and results of a probabilistic analysis of technical risk for a portfolio of R&D projects in the DOE Geothermal Technologies Program ('the Program'). The analysis is a task by Princeton Energy Resources International, LLC (PERI), in support of the National Renewable Energy Laboratory (NREL) on behalf of the Program. The main challenge in the analysis lies in translating R&D results to a quantitative reflection of technical risk for a key Program metric: levelized cost of energy (LCOE). This requires both computational development (i.e., creating a spreadsheet-based analysis tool) and a synthesis of judgments by a panel of researchers and experts of the expected results of the Program's R&D.

  14. Preliminary Technical Risk Analysis for the Geothermal Technologies Program

    Broader source: Energy.gov [DOE]

    This report explains the goals, methods, and results of a probabilistic analysis of technical risk for a portfolio of R&D projects in the DOE Geothermal Technologies Program.

  15. Singin' in the Rain

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Singin' in the Rain News News Home Featured Articles 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Science Headlines Science Highlights Presentations & Testimony News Archives Communications and Public Affairs Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 11.25.13 Singin' in the Rain Ultra water-repellent material developed at Brookhaven Lab may lead to many warming applications. Print Text

  16. Preliminary assessment report for Fort Jacob F. Wolters, Installation 48555, Mineral Wells, Texas. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.B.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (TXARNG) property near Mineral Wells, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Wolters property, the requirement of the Department of Defense Installation Restoration Program.

  17. Preliminary assessment report for Fort Custer Training Center, Installation 26035, Augusta, Michigan. Installation Restoration Program

    SciTech Connect (OSTI)

    Flaim, S.; Krokosz, M.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Michigan Army National Guard property near Augusta, Michigan. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Fort Custer Training Center, phase I of the Department of Defense Installation Restoration Program. The environmentally significant operations associated with the property are (1) storage of hazardous materials and hazardous waste, (2) storage and dispensing of fuel, (3) washing of vehicles and equipment, and (4) weapons training ranges that may have accumulated lead.

  18. Preliminary assessment report for Camp Swift Military Reservation, Installation 48070, Bastrop County, Texas. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.B.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard property in Bastrop County, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Camp Swift property, the requirement of the Department of Defense Installation Restoration Program (IRP). The review of both historical and current practices at the property indicated that the activities at Camp Swift include no operations considered to have an adverse impact to the environment. The recommendation, therefore, is that no further IRP action is necessary at this property.

  19. Preliminary assessment report for Waiawa Gulch, Installation 15080, Pearl City, Oahu, Hawaii. Installation Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Hawaii Army National Guard (HIARNG) property near Pearl City, Oahu, Hawaii. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Waiawa Gulch property, phase I of the Department of Defense Installation Restoration Program (IRP).

  20. Rain sampling device

    DOE Patents [OSTI]

    Nelson, D.A.; Tomich, S.D.; Glover, D.W.; Allen, E.V.; Hales, J.M.; Dana, M.T.

    1991-05-14

    The present invention constitutes a rain sampling device adapted for independent operation at locations remote from the user which allows rainfall to be sampled in accordance with any schedule desired by the user. The rain sampling device includes a mechanism for directing wet precipitation into a chamber, a chamber for temporarily holding the precipitation during the process of collection, a valve mechanism for controllably releasing samples of the precipitation from the chamber, a means for distributing the samples released from the holding chamber into vessels adapted for permanently retaining these samples, and an electrical mechanism for regulating the operation of the device. 11 figures.

  1. Rain sampling device

    DOE Patents [OSTI]

    Nelson, Danny A. (Richland, WA); Tomich, Stanley D. (Richland, WA); Glover, Donald W. (Prosser, WA); Allen, Errol V. (Benton City, WA); Hales, Jeremy M. (Kennewick, WA); Dana, Marshall T. (Richland, WA)

    1991-01-01

    The present invention constitutes a rain sampling device adapted for independent operation at locations remote from the user which allows rainfall to be sampled in accordance with any schedule desired by the user. The rain sampling device includes a mechanism for directing wet precipitation into a chamber, a chamber for temporarily holding the precipitation during the process of collection, a valve mechanism for controllably releasing samples of said precipitation from said chamber, a means for distributing the samples released from the holding chamber into vessels adapted for permanently retaining these samples, and an electrical mechanism for regulating the operation of the device.

  2. Preliminary Impact Evaluation BBNP

    Broader source: Energy.gov [DOE]

    Preliminary Impact Evaluation of the U.S. Department of Energy's Better Buildings Neighborhood Program, 2013.

  3. NNSA Procurement Projects Perspective - Bob Raines, Associate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects Perspective - Bob Raines, Associate Administrator for Acquisition and Project Management, NNSA NNSA Procurement Projects Perspective - Bob Raines, Associate Administrator ...

  4. Rain Gauge Instrument Handbook

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 Rain Gauge Instrument Handbook MJ Bartholomew January 2016 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights.

  5. 2014-09-16 Issuance: Energy Efficiency Program for Consumer Products: Energy Conservation Standards for Ceiling Fans: Public Meeting and Availability of the Preliminary Technical Support Document

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register Energy Efficiency Program for Consumer Products: Energy Conservation Standards for Ceiling Fans: Public Meeting and Availability of the Preliminary Technical Support Document.

  6. Preliminary Process and Market Evaluation: Better Buildings Neighborho...

    Energy Savers [EERE]

    Program: Report Appendices Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program: Report Appendices Final Report Appendices: Preliminary Process and...

  7. Scientists Find Surprising Link Between Rain and Airborne Particles

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scientists Find Surprising Link Between Rain and Airborne Particles

  8. Issuance 2014-11-21:Energy Efficiency Program for Consumer Products: Energy Conservation Standards for Ceiling Fans: Availability of the Preliminary Technical Support Document, Notice of Comment Period Extension

    Broader source: Energy.gov [DOE]

    Energy Efficiency Program for Consumer Products: Energy Conservation Standards for Ceiling Fans: Availability of the Preliminary Technical Support Document, Notice of Comment Period Extension

  9. EA-1173: Grande Ronde Basin Endemic Spring Chinook Salmon Supplemental Program (Preliminary), Oregon

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the U.S. Department of Energy Bonneville Power Administration's proposal to fund a program designed to prevent the extinction and begin the recovery...

  10. Preliminary Analysis of the Jobs and Economic Impacts of 1603 Treasury Grant Program

    Broader source: Energy.gov [DOE]

    This analysis responds to a request from the Department of Energy Office of Energy Efficiency and Renewable Energy (DOE-EERE) to the National Renewable Energy Laboratory (NREL) to estimate the direct and indirect jobs and economic impacts of projects supported by the §1603 Treasury grant program. The analysis employs the Jobs and Economic Development Impacts (JEDI) models to estimate the gross jobs, earnings, and economic output supported by the construction and operation of solar photovoltaic (PV) and large wind (greater than 1 MW) projects funded by the §1603 grant program. Through November 10, 2011, the §1603 grant program has provided approximately $9.0 billion in funds to over 23,000 PV and large wind projects, comprising 13.5 GW of electric generating capacity.

  11. Preliminary Assessment of the Hanford Tank Waste Feed Acceptance and Product Qualification Programs

    SciTech Connect (OSTI)

    Herman, C. C.; Adamson, Duane J.; Herman, D. T.; Peeler, David K.; Poirier, Micheal R.; Reboul, S. H.; Stone, M. E.; Peterson, Reid A.; Chun, Jaehun; Fort, James A.; Vienna, John D.; Wells, Beric E.

    2013-04-01

    The U.S. Department of Energy Office of Environmental Management (EM) is engaging the national laboratories to provide the scientific and technological rigor to support EM program and project planning, technology development and deployment, project execution, and assessment of program outcomes. As an early demonstration of this new responsibility, Savannah River National Laboratory (SRNL) and Pacific Northwest National Laboratory (PNNL) have been chartered to implement a science and technology program addressing Hanford Tank waste feed acceptance and product qualification. As a first step, the laboratories examined the technical risks and uncertainties associated with the planned waste feed acceptance and qualification testing for Hanford tank wastes. Science and technology gaps were identified for work associated with 1) feed criteria development with emphasis on identifying the feed properties and the process requirements, 2) the Tank Waste Treatment and Immobilization Plant (WTP) process qualification program, and 3) the WTP HLW glass product qualification program. Opportunities for streamlining the accetpance and qualification programs were also considered in the gap assessment. Technical approaches to address the science and technology gaps and/or implement the opportunities were identified. These approaches will be further refined and developed as strong integrated teams of researchers from national laboratories, contractors, industry, and academia are brought together to provide the best science and technology solutions. Pursuing the identified approaches will have immediate and long-term benefits to DOE in reducing risks and uncertainties associated with tank waste removal and preparation, transfers from the tank farm to the WTP, processing within the WTP Pretreatment Facility, and in producing qualified HLW glass products. Additionally, implementation of the identified opportunities provides the potential for long-term cost savings given the anticipated facility life of WTP.

  12. Acid rain information book. Draft final report

    SciTech Connect (OSTI)

    1980-12-01

    Acid rain is one of the most widely publicized environmental issues of the day. The potential consequences of increasingly widespread acid rain demand that this phenomenon be carefully evaluated. Reveiw of the literature shows a rapidly growing body of knowledge, but also reveals major gaps in understanding that need to be narrowed. This document discusses major aspects of the acid rain phenomenon, points out areas of uncertainty, and summarizes current and projected research by responsible government agencies and other concerned organizations.

  13. EA-1913: Preliminary Environmental Assessment | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Preliminary Environmental Assessment EA-1913: Preliminary Environmental Assessment Springfield Sockeye Hatchery Program, Springfield, Bingham County, Idaho This EA evaluates the ...

  14. Preliminary results and status report of the Hawaiian Scientific Observation Hole program

    SciTech Connect (OSTI)

    Olson, Harry J.; Deymonaz, John E.

    1992-01-01

    The Hawaii Natural Energy Institute (HNEI), an institute within the School of Ocean and Earth Science and Technology, at the University of Hawaii at Manoa has drilled three Scientific Observation Holes (SOH) in the Kilauea East Rift Zone to assess the geothermal potential of the Big Island of Hawaii, and to stimulate private development of the resource. The first hole drilled, SOH-4, reached a depth of 2,000 meters and recorded a bottom hole temperature of 306 C. Although evidence of fossil reservoir conditions were encountered, no zones with obvious reservoir potential were found. The second hole, SOH- 1, was drilled to a depth of 1,684 meters, recorded a bottom hole temperature of 206.1 C and effectively defined the northern limit of the Hawaii Geothermal Project-Abbott--Puna Geothermal Venture (HGP-A/PGV) reservoir. The final hole, SOH-2, was drilled to a depth of 2,073 meters, recorded a bottom hole temperature of 350.5 C and has sufficient indicated permeability to be designated as a potential ''discovery''. The SOH program was also highly successful in developing slim hole drilling techniques and establishing subsurface geological conditions.

  15. Fracture toughness results and preliminary analysis for International Cooperative Test Program on specimens containing surface cracks

    SciTech Connect (OSTI)

    Reuter, W.G.; Elfer, N.C.; Hull, D.A.; Newman, J.C. Jr.; Munz, D.; Panontin, T.L.

    1997-12-31

    Specimens containing surface cracks were tested in either tension or bending to compare the stress intensity factor at failure with plane strain fracture toughness (K{sub Ic}) in an International Cooperative Test Program. The material was heat treated to {sigma}{sub ys} = 1 587 MPa and K{sub Ic} = 54 MPa m{sub 1/2}. Because substantial stable crack growth occurred for some specimens, the test plan was modified to include detecting the onset of crack growth. It is shown that P{sub max} and the original fatigue precrack size cannot be employed to calculate K{sub max} for comparison with K{sub Ic} when significant stable crack growth occurs. However, using P{sub init} (load at which stable crack growth is initiated) and the original fatigue precrack size to calculate K{sub max} or K{sub {phi}=30{degree}} provides a very useful comparison with K{sub Ic}. The influence of variations in fatigue precrack configuration on test results are also discussed.

  16. Preliminary Screening

    Broader source: Energy.gov [DOE]

    The first step in assessing renewable energy options is to conduct a preliminary screening to decide which technologies are worth investigating and which can be eliminated immediately. Preliminary...

  17. Preliminary assessment report for Grubbs/Kyle Training Center, Smyrna/Rutherford County Regional Airport, Installation 47340, Smyrna, Tennessee. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.; Stefano, J.

    1993-07-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Tennessee Army National Guard (TNARNG) property near Smyrna, Tennessee. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Grubbs/Kyle Training Center property, the requirement of the Department of Defense Installation Restoration Program.

  18. Rain Gauges Handbook (Technical Report) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Rain Gauges Handbook Citation Details In-Document Search Title: Rain Gauges Handbook To improve the quantitative description of precipitation processes in climate models, the Atmospheric Radiation Measurement (ARM) Climate Research Facility deployed rain gauges located near disdrometers (DISD and VDIS data streams). This handbook deals specifically with the rain gauges that make the observations for the RAIN data stream. Other precipitation observations are made by the surface meteorology

  19. February 13, 2013 Webinar: Preliminary Process and Market Evaluation -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Better Buildings Neighborhood Program Webcast | Department of Energy February 13, 2013 Webinar: Preliminary Process and Market Evaluation - Better Buildings Neighborhood Program Webcast February 13, 2013 Webinar: Preliminary Process and Market Evaluation - Better Buildings Neighborhood Program Webcast February 13, 2013 Webinar: Preliminary Process and Market Evaluation - Better Buildings Neighborhood Program Webcast ; Better Buildings Neighborhood Program; national program with a goal of

  20. Final Report Appendices: Preliminary Process and Market Evaluation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program Final Report Appendices: Preliminary Process and Market Evaluation: Better...

  1. NNSA Procurement Projects Perspective - Bob Raines, Associate Administrator

    Energy Savers [EERE]

    for Acquisition and Project Management, NNSA | Department of Energy Projects Perspective - Bob Raines, Associate Administrator for Acquisition and Project Management, NNSA NNSA Procurement Projects Perspective - Bob Raines, Associate Administrator for Acquisition and Project Management, NNSA PDF icon Workshop 2015 - Raines_NNSA Projects Perspective.pdf More Documents & Publications One Procurement Director's Perspective - Patricia Schuneman, Chicago Procurement Director NNSA Procurement

  2. Preliminary assessment report for Bee Caves Armory (former Nike BG-80 Fire Control Facility), Installation 48055, Austin, Texas. Installation Restoration Program

    SciTech Connect (OSTI)

    Dennis, C.

    1993-08-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (ARNG) property in Austin, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing, preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining, site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Bee Caves Armory property, the requirements of the Department of Defense Installation Restoration Program. Of concern is the potential for hazardous waste to be present on the property as a result of the former Nike Missile Base operations or in the form of original construction materials. Environmentally sensitive operations associated with the property from that period include (1) underground fuel storage, (2) hazardous materials storage/use, (3) disposal of hazardous waste and (4) release of hazardous waste water.

  3. Heavy rains hamper Louisiana gas line

    SciTech Connect (OSTI)

    Horner, C.

    1983-06-01

    Despite heavy rains and flooding a 36-mile gas pipeline loop for Transcontinental Gas Pipe Line Corp. was completed from north of Starks (at the end of Transco's south Louisiana lateral) to the Lake Charles area. Somastic-coated, 42-in. grade X-60 pipe comprises 90% of the route. The contract included multiple 30-42 in. fabrications, installation of six 42-in. gate valves, and expansion of the Gillis compressor station.

  4. PRELIMINARY DRAFT

    Energy Savers [EERE]

    PRELIMINARY ASSESSMENT TEMPLATE PRELIMINARY ASSESSMENT TEMPLATE Document presents a template for the preliminary assessment (PA) that energy service companies (ESCOs) are required to conduct in an energy savings performance contract (ESPC) project under the U.S.Department of Energy's indefinite-delivery, indefinite-quantity ESPC contract. This PA template was developed from a PA from an actual ESPC project. Names, locations, and project details have been altered to not reveal proprietary

  5. Preliminary Analysis of the Jobs and Economic Impacts of Renewable Energy Projects Supported by the 1603Treasury Grant Program

    SciTech Connect (OSTI)

    Steinberg, Daniel; Porro, Gian; Goldberg, Marshall

    2012-04-01

    This analysis responds to a request from the Department of Energy Office of Energy Efficiency and Renewable Energy to the National Renewable Energy Laboratory (NREL) to estimate the direct and indirect jobs and economic impacts of projects supported by the 1603 Treasury grant program. The analysis employs the Jobs and Economic Development Impacts (JEDI) models to estimate the gross jobs, earnings, and economic output supported by the construction and operation of the large wind (greater than 1 MW) and solar photovoltaic (PV) projects funded by the 1603 grant program.

  6. Preliminary Analysis of the Jobs and Economic Impacts of Renewable Energy Projects Supported by the 1603 Treasury Grant Program

    SciTech Connect (OSTI)

    Steinberg, Daniel; Porro, Gian; Goldberg, Marshall

    2012-04-09

    This analysis responds to a request from the Department of Energy Office of Energy Efficiency and Renewable Energy to the National Renewable Energy Laboratory (NREL) to estimate the direct and indirect jobs and economic impacts of projects supported by the 1603 Treasury grant program. The analysis employs the Jobs and Economic Development Impacts (JEDI) models to estimate the gross jobs, earnings, and economic output supported by the construction and operation of the large wind (greater than 1 MW) and solar photovoltaic (PV) projects funded by the 1603 grant program.

  7. Preliminary Analysis of the Jobs and Economic Impacts of Renewable Energy Projects Supported by the ..Section..1603 Treasury Grant Program

    SciTech Connect (OSTI)

    Steinberg, D.; Porro, G.; Goldberg, M.

    2012-04-01

    This analysis responds to a request from the Department of Energy Office of Energy Efficiency and Renewable Energy to the National Renewable Energy Laboratory (NREL) to estimate the direct and indirect jobs and economic impacts of projects supported by the Section 1603 Treasury grant program. The analysis employs the Jobs and Economic Development Impacts (JEDI) models to estimate the gross jobs, earnings, and economic output supported by the construction and operation of the large wind (greater than 1 MW) and solar photovoltaic (PV) projects funded by the Section 1603 grant program.

  8. Preliminary Evaluation of the Section 1603 Treasury Grant Program for Renewable Power Projects in the United States

    SciTech Connect (OSTI)

    Bolinger, Mark; Wiser, Ryan; Darghouth, Naim

    2010-05-05

    This article evaluates the first year of the Section 1603 Treasury cash grant program, which enables renewable power projects in the U.S. to elect cash grants in lieu of the federal tax credits that are otherwise available. To date, the program has been heavily subscribed, particularly by wind power projects, which had received 86% of the nearly $2.6 billion in grants that had been disbursed as of March 1, 2010. As of that date, 6.2 GW of the 10 GW of new wind capacity installed in the U.S. in 2009 had applied for grants in lieu of production tax credits. Roughly 2.4 GW of this wind capacity may not have otherwise been built in 2009 absent the grant program; this 2.4 GW may have supported approximately 51,600 short-term full-time-equivalent (FTE) gross job-years in the U.S. during the construction phase of these wind projects, and 3,860 longterm FTE gross jobs during the operational phase. The program’s popularity stems from the significant economic value that it provides to renewable power projects, relative to the otherwise available tax credits. Although grants reward investment rather than efficient performance, this evaluation finds no evidence at this time of either widespread “gold-plating” or performance problems.

  9. Acid rain legislation and local areas

    SciTech Connect (OSTI)

    Jones, G.H.B.

    1992-01-01

    This study explores the local economic impacts of the phase I requirements of the 1990 acid rain legislation. This legislation allows electric utilities to adopt least cost ways of reducing sulfur dioxide pollution. The impact on employment, income and size distribution of income due to a switch to low sulfur coal is examined for a selected number of high sulfur coal producing counties in southern Illinois. In order to achieve the above objectives a generalized non-survey input-output model, IMPLAN (Impact Analysis for Planning), is employed to estimate first- and second-order employment and income effects of a switch to low sulfur coal. Two models, I and II, are constructed to provide these estimates. In Model I, income is generated and adjusted to reflect income retained and spent within the four county region. In Model II, no adjustment is made for flows into and out of the region. In addition to adjustments in income, adjustments in direct employment impacts were made in both models to account for retirements. Scenarios reflecting different degrees of coal switching, low and high switching options, were examined under both models. With regards to size distribution impacts, a newly developed operational model compatible with IMPLAN and developed by Rose et al (1988) was employed. This model is a member of a class of models collectively termed extended input-output models. As in the case of employment and income, allowance was made for income generated, retained and spent within the four counties in the assessment of income distribution impacts. The findings indicate that the adverse effects of a switch to low sulfur coal under the 1990 acid rain legislation will primarily hurt the coal mining industry. Coal mining employment and income will be adversely affected. Employment and income declines in other industries in the region will be fairly slight. Second, income distribution becomes slightly more equal for the local area due to acid rain control.

  10. Preliminary Process and Market Evaluation

    Broader source: Energy.gov [DOE]

    Preliminary Process and Market Evaluation, from a team of evaluators, independent of the BBNP program, with whom DOE contracted to assess the performance of BBNP and identify lessons learned.

  11. Preliminary Energy Savings Impact Evaluation: Better Buildings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4, 2013. PDF icon Preliminary Energy Savings Impact Evaluation More Documents & Publications Savings and Economic Impacts of the Better Buildings Neighborhood Program, Final ...

  12. Preliminary Energy Savings Impact Evaluation: Better Buildings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report Preliminary Energy Savings Impact Evaluation: Better Buildings Neighborhood Program American Recovery and Reinvestment Act of 2009 November 4, 2013 Prepared For: U.S....

  13. Preliminary Evaluation of the Impact of the Section 1603 Treasury Grant Program on Renewable Energy Deployment in 2009

    SciTech Connect (OSTI)

    Bolinger, Mark; Wiser, Ryan; Darghouth, Naim

    2010-03-31

    Federal support for renewable energy deployment in the United States has traditionally been delivered primarily through tax benefits, including the production tax credit ('PTC') in Section 45 of the U.S. tax code, investment tax credits ('ITC') in Sections 25D and 48, and accelerated tax depreciation in Section 168. Many renewable power project developers are unable to use the majority of these tax benefits directly or immediately, however, and have therefore often relied on third-party 'tax equity' investors for the necessary investment capital in order to monetize the available tax benefits. As has been well-publicized, most of these tax equity investors were hit hard by the global financial crisis that unfolded in the last months of 2008 and, as a result, most either withdrew from the renewable power market at that time or reduced their available investment capital. This left a significant financing gap beginning in late 2008, and placed at some risk the continued near-term growth of renewable energy supply in the U.S. In recognition of these developments, the U.S. Congress passed two stimulus bills - The Energy Improvement and Extension Act ('the Extension Act') in October 2008 and The American Recovery and Reinvestment Act ('the Recovery Act') in February 2009 - parts of which were intended to address the growing shortage of finance for renewable power projects. Most notably, Section 1603 of the Recovery Act enables qualifying commercial renewable energy projects to choose between the Section 45 PTC, the Section 48 ITC, or a cash grant of equal value to the Section 48 ITC (i.e., 30% of the project's eligible basis in most cases). By giving developers the option to receive a 30% cash grant (administered by the U.S. Department of the Treasury) in lieu of either the ITC or the PTC, Congress hoped to 'temporarily fill the gap created by the diminished investor demand for tax credits,' and thereby achieve 'the near term goal of creating and retaining jobs - as well as the long-term benefit of expanding the use of clean and renewable energy and decreasing our dependency on non-renewable energy sources' (U.S. Department of the Treasury 2009). More than a year has now passed since the Recovery Act became law. Although the Section 1603 program has been operational for only part of that time - roughly eight months - the program faces a looming milestone in just another nine months. Specifically, in order to qualify for the Section 1603 grant, eligible projects must have commenced construction by the end of 2010. With this deadline approaching, the Committee on Ways and Means of the U.S. House of Representatives requested that Lawrence Berkeley National Laboratory evaluate the effectiveness of the Section 1603 grant program to date (see Attachment 1), focusing on specific elements of the program that were subsequently agreed upon by Committee staff, the U.S. Department of Energy, and Berkeley Lab. This report responds to the Committee's request. The evaluation focuses primarily on the commercial wind power sector, for two reasons: (1) commercial wind power projects had received nearly 86% of all grant money awarded as of March 1, 2010; and (2) there is substantially more market-related information available for the commercial wind power sector than there is for other renewable power sectors, thereby facilitating analysis. Despite the focus on wind power, this initial analysis does endeavor to provide relevant information on other technologies, and in particular geothermal (the second-largest recipient of grant money), where possible.

  14. Electric Utility Phase I Acid Rain Compliance Strategies for the Clean Air Act Amendments of 1990

    Reports and Publications (EIA)

    1994-01-01

    The Acid Rain Program is divided into two time periods; Phase I, from 1995 through 1999, and Phase II, starting in 2000. Phase I mostly affects power plants that are the largest sources of SO2 and NOx . Phase II affects virtually all electric power producers, including utilities and nonutilities. This report is a study of the effects of compliance with Phase I regulations on the costs and operations of electric utilities, but does not address any Phase II impacts.

  15. Preliminary Process and Market Evaluation: Better Buildings Neighborho...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This document presents the preliminary process and market evaluation of the U.S. ... to conduct a comprehensive program assessment of BBNP. BBNP is one of many programs ...

  16. Microsoft PowerPoint - 16.0855_Raines Draft Rev 4 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    55Raines Draft Rev 4 Microsoft PowerPoint - 16.0855Raines Draft Rev 4 PDF icon Microsoft PowerPoint - 16.0855Raines Draft Rev 4 More Documents & Publications Enhancing Earned...

  17. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in the United States. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    This report is a summary of a series of preliminary reports describing the laws and regulatory programs of the United states and each of the 50 states affecting the siting and operation of energy generating facilities likely to be used in Integrated Community Energy Systems (ICES). A brief summary of public utility regulatory programs, energy facility siting programs, and municipal franchising authority is presented in this report to identify how such programs and authority may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES. Subsequent reports will (1) describe public utility rate regulatory procedures and practices as they might affect an ICES, (2) analyze each of the aforementioned regulatory programs to identify impediments to the development of ICES, and (3) recommend potential changes in legislation and regulatory practices and procedures to overcome such impediments.

  18. Preliminary Energy Savings Impact Evaluation: Better Buildings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This document presents the findings from the preliminary impact evaluation of the U.S. ... to conduct a comprehensive program assessment of BBNP. BBNP is one of many programs ...

  19. The future of emissions trading in light of the acid rain experience

    SciTech Connect (OSTI)

    McLean, B.J.; Rico, R.

    1995-12-31

    The idea of emissions trading was developed more than two decades ago by environmental economists eager to provide new ideas for how to improve the efficiency of environmental protection. However, early emissions trading efforts were built on the historical {open_quotes}command and control{close_quotes} infrastructure which has dominated U.S. environmental protection until today. The {open_quotes}command and control{close_quotes} model initially had advantages that were of a very pragmatic character: it assured large pollution reductions in a time when large, cheap reductions were available and necessary; and it did not require a sophisticated government infrastructure. Within the last five years, large-scale emission trading programs have been successfully designed and started that are fundamentally different from the earlier efforts, creating a new paradigm for environmental control just when our understanding of environmental problems is changing as well. The purpose of this paper is to focus on the largest national-scale program--the Acid Rain Program--and from that experience, forecast when emission trading programs may be headed based on our understanding of the factors currently influencing environmental management. The first section of this paper will briefly review the history of emissions trading programs, followed by a summary of the features of the Acid Rain Program, highlighting those features that distinguish it from previous efforts. The last section addresses the opportunities for emissions trading (and its probable future directions).

  20. NRT preliminary design

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    preliminary design - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced

  1. PRELIMINARY SURVEY OF VITRO CORPORATION

    Office of Legacy Management (LM)

    PRELIMINARY SURVEY OF VITRO CORPORATION (VITRO LABORATORIES) WEST ORANGE, NEW JERSEY Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Actton Program VITRO CORPORATION (VITRO LABORATORIES) WEST ORANGE, NEW JERSEY At the request of the Department of Energy (DOE), a preliminary

  2. ARM - Field Campaign - Rain Microphysics Study with Disdrometer...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to hear from you Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : Rain Microphysics Study with Disdrometer and Polarization Radar 2005.04.28 - 2005.06.30 Lead...

  3. Dimethyl sulfide in the Amazon rain forest

    SciTech Connect (OSTI)

    Jardine, Kolby; Yanez-Serrano, A. M.; Williams, J.; Kunert, N.; Jardine, A.; Taylor, T.; Abrell, L.; Artaxo, Paulo; Guenther, Alex B.; Hewitt, C. N.; House, E.; Florentino, A. P.; Manzi, A.; Higuchi, N.; Kesselmeier, J.; Behrendt, T.; Veres, P. R.; Derstroff, B.; Fuentes, J.; Martin, Scot T.; Andreae, M. O.

    2015-01-01

    Surface-to-atmosphere emissions of dimethyl sulfide (DMS) may impact global climate 44 through the formation of gaseous sulfuric acid, which can yield secondary sulfate 45 aerosols and contribute to new particle formation. While oceans are generally 46 considered the dominant source of DMS, a shortage of ecosystem observations prevents 47 an accurate analysis of terrestrial DMS sources. Using mass spectrometry, we quantified 48 ambient DMS mixing ratios within and above a primary rainforest ecosystem in the 49 central Amazon Basin in real-time (2010-2011) and at high vertical resolution (2013-50 2014). Elevated but highly variable DMS mixing ratios were observed within the 51 canopy, showing clear evidence of a net ecosystem source to the atmosphere during 52 both day and night in both the dry and wet seasons. Periods of high DMS mixing ratios 53 lasting up to 8 hours (up to 160 ppt) often occurred within the canopy and near the 54 surface during many evenings and nights. Daytime gradients showed mixing ratios (up 55 to 80 ppt) peaking near the top of the canopy as well as near the ground following a rain 56 event. The spatial and temporal distribution of DMS suggests that ambient levels and 57 their potential climatic impacts are dominated by local soil and plant emissions. A soil 58 source was confirmed by measurements of DMS emission fluxes from Amazon soils as 59 a function of temperature and soil moisture. Furthermore, light and temperature 60 dependent DMS emissions were measured from seven tropical tree species. Our study 61 has important implications for understanding terrestrial DMS sources and their role in 62 coupled land-atmosphere climate feedbacks. 63

  4. Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

    Energy Savers [EERE]

    Program | Department of Energy Energy Savings Impact Evaluation: Better Buildings Neighborhood Program Preliminary Energy Savings Impact Evaluation: Better Buildings Neighborhood Program Preliminary Energy Savings Impact Evaluation: Better Buildings Neighborhood Program, American Recovery and Reinvestment Act of 2009, prepared for the U.S. Department of Energy, November 4, 2013. PDF icon Preliminary Energy Savings Impact Evaluation More Documents & Publications Savings and Economic

  5. Preliminary Energy Savings Impact Evaluation: Better Buildings Neighborhood

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program | Department of Energy Energy Savings Impact Evaluation: Better Buildings Neighborhood Program Preliminary Energy Savings Impact Evaluation: Better Buildings Neighborhood Program Preliminary Energy Savings Impact Evaluation: Better Buildings Neighborhood Program, American Recovery and Reinvestment Act of 2009, prepared for the U.S. Department of Energy, November 4, 2013. PDF icon Preliminary Energy Savings Impact Evaluation More Documents & Publications Savings and Economic

  6. PRELIMINARY DRAFT

    Office of Environmental Management (EM)

    ... Preservation ACS American Community Survey AIP Airport Improvement Program APC Air Pollution Control APE Area of Potential Effects ARA Aquatic Reference Area ARAP Aquatic ...

  7. Rain or Shine: We Cycle for Science | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rain or Shine: We Cycle for Science Rain or Shine: We Cycle for Science July 2, 2015 - 10:39am Addthis Elizabeth and Rachel visit a YWCA in Waterloo, Iowa. | Photo courtesy of Cycle for Science. Elizabeth and Rachel visit a YWCA in Waterloo, Iowa. | Photo courtesy of Cycle for Science. Rachel Woods-Robinson Guest Blogger, Cycle for Science Elizabeth Case Guest Blogger, Cycle for Science Cycle for Science Read more about Elizabeth and Rachel's journey in their check-in blog posts from April and

  8. Preliminary Environmental Assessment and Analysis of EGS Technologies |

    Broader source: Energy.gov (indexed) [DOE]

    Program | Department of Energy Preliminary Energy Savings Impact Evaluation: Better Buildings Neighborhood Program, American Recovery and Reinvestment Act of 2009, prepared for the U.S. Department of Energy, November 4, 2013. PDF icon Preliminary Energy Savings Impact Evaluation More Documents & Publications Savings and Economic Impacts of the Better Buildings Neighborhood Program, Final Evaluation Volume 2 Preliminary Energy Savings Impact Evaluation: Better Buildings Neighborhood

  9. Preliminary Notice of Violation, Lawrence Livermore National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    worker safety and health program (10 C.F.R. Part 851) associated with the sulfuric acid burn event that occurred at Lawrence Livermore National Laboratory. PDF icon Preliminary...

  10. Preliminary Notice of Violation, Lawrence Livermore National...

    Broader source: Energy.gov (indexed) [DOE]

    worker safety and health program (10 C.F.R. Part 851) associated with the sulfuric acid burn event that occurred at Lawrence Livermore National Laboratory. Preliminary Notice of...

  11. Programming

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Programming Programming Compiling and linking programs on Euclid. Compiling Codes How to compile and link MPI codes on Euclid. Read More » Using the ACML Math Library How to compile and link a code with the ACML library and include the $ACML environment variable. Read More » Process Limits The hard and soft process limits are listed. Read More » Last edited: 2016-04-29 11:35:11

  12. Programming

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Programming Programming Compiling Codes on Hopper Cray provides a convenient set of wrapper commands that should be used in almost all cases for compiling and linking parallel programs. Invoking the wrappers will automatically link codes with the MPI libraries and other Cray system software libraries. All the MPI and Cray system include directories are also transparently imported. This page shows examples of how to compile codes on Franklin and Hopper. Read More » Shared and Dynamic Libraries

  13. Preliminary Process and Market Evaluation: Better Buildings Neighborho...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Laboratory to conduct a comprehensive program assessment of BBNP. PDF icon Preliminary Process and Market Evaluation: BBNP More Documents & Publications Process Evaluation ...

  14. Gas turbines and acid rain - Looking at some solutions

    SciTech Connect (OSTI)

    May, W.

    1989-01-01

    This article examines the technology available for reducing the sulfur emissions of gas turbines that are implicated in the production of acid rain. The alternatives reviewed are limestone scrubbing, spray dryer absorption and limestone injection into boilers. The last process is not feasible for gas turbines and of the other two the author recommends limestone scrubbing.

  15. Programming

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    using MPI and OpenMP on NERSC systems, the same does not always exist for other supported parallel programming models such as UPC or Chapel. At the same time, we know that these...

  16. Programming

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    provided on the Cray systems at NERSC. The Programming Environment is managed by a meta-module named similar to "PrgEnv-gnu4.6". The "gnu" indicates that it is providing the...

  17. AGENDA (Preliminary)

    Energy Savers [EERE]

    PRESENTATIONS Energy Storage Systems (ESS) PRESENTATION SPEAKER Perspective of Energy Storage Advisory Committee Brad Roberts (S&C Electric) Overview of ESS Program John Boyes (Sandia National Laboratories) Update on the Joint Energy Storage Collaboration Between NYSERDA & DOE Joe Sayer (N.Y. State Energy Research & Development Association) Advanced, Sodium-Sulfur, Battery Energy Storage System Project at MTA Long Island Bus Guy Sliker (N.Y. Power Authority) 300 kW/900 kWh PowerTower

  18. Rain-Induced Increase in Background Radiation Detected by Radiation Portal Monitors

    SciTech Connect (OSTI)

    Hausladen, Paul; Blessinger, Christopher S; Guzzardo, Tyler; Livesay, Jake

    2012-07-01

    A complete understanding of both the steady state and transient background measured by Radiation Portal Monitors (RPMs) is essential to predictable system performance, as well as maximization of detection sensitivity. To facilitate this understanding, a test bed for the study of natural background in RPMs has been established at the Oak Ridge National Laboratory. This work was performed in support of the Second Line of Defense Program's mission to detect the illicit movement of nuclear material. In the present work, transient increases in gamma ray counting rates in RPMs due to rain are investigated. The increase in background activity associated with rain, which has been well documented in the field of environmental radioactivity, originates from the atmospheric deposition of two radioactive daughters of radon-222, namely lead-214 and bismuth-214 (henceforth {sup 222}Rn, {sup 214}Pb and {sup 214}Bi). In this study, rainfall rates recorded by a co-located weather station are compared with RPM count rates and High Purity Germanium spectra. The data verifies these radionuclides are responsible for the dominant transient natural background fluctuations in RPMs. Effects on system performance and potential mitigation strategies are discussed.

  19. Preliminary Energy Savings Impact Evaluation: Better Buildings Neighborhood

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program, Final report | Department of Energy Energy Savings Impact Evaluation: Better Buildings Neighborhood Program, Final report Preliminary Energy Savings Impact Evaluation: Better Buildings Neighborhood Program, Final report This document presents the findings from the preliminary impact evaluation of the U.S. Department of Energy's (DOE) Better Buildings Neighborhood Program (BBNP). The report was prepared in partial fulfillment of a contract with the Lawrence Berkeley National

  20. National spent fuel program preliminary report RCRA characteristics of DOE-owned spent nuclear fuel DOE-SNF-REP-002. Revision 3

    SciTech Connect (OSTI)

    1995-07-01

    This report presents information on the preliminary process knowledge to be used in characterizing all Department of Energy (DOE)-owned Spent Nuclear Fuel (SNF) types that potentially exhibit a Resource Conservation and Recovery Act (RCRA) characteristic. This report also includes the process knowledge, analyses, and rationale used to preliminarily exclude certain SNF types from RCRA regulation under 40 CFR {section}261.4(a)(4), ``Identification and Listing of Hazardous Waste,`` as special nuclear and byproduct material. The evaluations and analyses detailed herein have been undertaken as a proactive approach. In the event that DOE-owned SNF is determined to be a RCRA solid waste, this report provides general direction for each site regarding further characterization efforts. The intent of this report is also to define the path forward to be taken for further evaluation of specific SNF types and a recommended position to be negotiated and established with regional and state regulators throughout the DOE Complex regarding the RCRA-related policy issues.

  1. Light rain events change over North America, Europe and Asia for 1973-2009

    SciTech Connect (OSTI)

    Qian, Yun; Gong, Daoyi; Leung, Lai-Yung R.

    2010-10-28

    Long-term daily precipitation data from NCDC are used to investigate the changes of light rain events from 1973-2009 over North America, Europe and Asia. Results reveal that the trend of light rain events presents a remarkably diverse feature in different regions, while an overall decrease trend can be found over the continents in northern hemisphere. In North America, most of stations show a decrease trend for light rain on the annual basis but a decrease trend can also be found for moderate and heavy rain. The opposite trends are observed over the stations in Europe and the trend of light rain is not significant when averaged for all the stations. In Asia, especially East Asia, the light rain days show an overwhelming decrease trend with high spatial coherency. Meanwhile the moderate and heavy rain events (> 10 mm/day) have increased, suggesting a remarkable shift of precipitation from light to heavy rain in East Asia. While both the warming at a global scale and increased atmospheric aerosols due to air pollution at a regional scale (e.g. East Asia) may have affected the light rain changes, it remains a challenging task to quantitatively detect and separate the cause of light rain changes in different regions. ?

  2. Microsoft PowerPoint - 16.0855_Raines Draft Rev 4

    Energy Savers [EERE]

    Management Update Project Management Update Bob Raines Director, Project Management Systems and Assessments * Everybody's Favorite Subject Cost Estimating * Cost Estimating * EVMS...

  3. Fact Sheet, Preliminary Notice of Violation: Four Hazardous Energy Control

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Events at LANL | Department of Energy Sheet, Preliminary Notice of Violation: Four Hazardous Energy Control Events at LANL Fact Sheet, Preliminary Notice of Violation: Four Hazardous Energy Control Events at LANL On October 17, 2012, the National Nuclear Security Administration (NNSA) issued a Preliminary Notice of Violation (PNOV) to Los Alamos National Security, LLC (LANS) for violations of Department of Energy (DOE) worker safety and health program requirements. LANS is the management and

  4. Notice of Availability of Preliminary Plan for Retrospective Analysis of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Existing Rules | Department of Energy Availability of Preliminary Plan for Retrospective Analysis of Existing Rules Notice of Availability of Preliminary Plan for Retrospective Analysis of Existing Rules Through this notice, the Department of Energy (DOE) announces the availability of its preliminary plan for retrospective analysis of existing rules to make the agency's regulatory program more effective and less burdensome in achieving its regulatory objectives. As part of its implementation

  5. The North Carolina Field Test: Field performance of the preliminary version of an advanced weatherization audit for the Department of Energy`s Weatherization Assistance Program

    SciTech Connect (OSTI)

    Sharp, T.R.

    1994-06-01

    The field performance of weatherizations based on a newly-developed advanced technique for selecting residential energy conservation measures was tested alongside current Retro-Tech-based weatherizations in North Carolina. The new technique is computer-based and determines measures based on the needs of an individual house. In addition, it recommends only those measures that it determines will have a benefit-to-cost ratio greater than 1 for the house being evaluated. The new technique also considers the interaction of measures in computing the benefit-to-cost ratio of each measure. The two weatherization approaches were compared based on implementation ease, measures installed, labor and cost requirements, and both heating and cooling energy savings achieved. One-hundred and twenty houses with the following characteristics participated: the occupants were low-income, eligible for North Carolina`s current weatherization program, and responsible for their own fuel and electric bills. Houses were detached single-family dwellings, not mobile homes; were heated by kerosene, fuel oil, natural gas, or propane; and had one or two operating window air conditioners. Houses were divided equally into one control group and two weatherization groups. Weekly space heating and cooling energy use, and hourly indoor and outdoor temperatures were monitored between November 1989 and September 1990 (pre-period) and between December 1990 and August 1991 (post-period). House consumption models were used to normalize for annual weather differences and a 68{degrees}F indoor temperature. Control group savings were used to adjust the savings determined for the weatherization groups. The two weatherization approaches involved installing attic and floor insulations in near equivalent quantities, and installing storm windows and wall insulation in drastically different quantities. Substantial differences also were found in average air leakage reductions for the two weatherization groups.

  6. The North Carolina Field Test: Field Performance of the Preliminary Version of an Advanced Weatherization Audit for the Department of Energy's Weatherization Assistance Program

    SciTech Connect (OSTI)

    Sharp, T.R.

    1994-01-01

    The field performance of weatherizations based on a newly-developed advanced technique for selecting residential energy conservation measures was tested alongside current Retro-Tech-based weatherizations in North Carolina. The new technique is computer-based and determines measures based on the needs of an individual house. In addition, it recommends only those measures that it determines will have a benefit-to-cost ratio greater than 1 for the house being evaluated. The new technique also considers the interaction of measures in computing the benefit-to-cost ratio of each measure. The two weatherization approaches were compared based on implementation ease, measures installed, labor and cost requirements, and both heating and cooling energy savings achieved. One-hundred and twenty houses with the following characteristics participated: the occupants were low-income, eligible for North Carolina's current weatherization program, and responsible for their own fuel and electric bills. Houses were detached single-family dwellings, not mobile homes; were heated by kerosene, fuel oil, natural gas, or propane; and had one or two operating window air conditioners. Houses were divided equally into one control group and two weatherization groups. Weekly space heating and cooling energy use, and hourly indoor and outdoor temperatures were monitored between November 1989 and September 1990 (pre-period) and between December 1990 and August 1991 (post-period). House consumption models were used to normalize for annual weather differences and a 68 F indoor temperature. Control group savings were used to adjust the savings determined for the weatherization groups. The two weatherization approaches involved installing attic and floor insulations in near equivalent quantities, and installing storm windows and wall insulation in drastically different quantities. Substantial differences also were found in average air leakage reductions for the two weatherization groups. Average, weather-normalized heating and cooling energy savings were 33 and 18%, respectively, for weatherizations where the new technique was used, and 23 and 3% for Retro-Tech-based weatherizations. Weatherizations using the new technique achieved 43% more heating energy savings and substantially more cooling energy savings; they cost around 10% less at two agencies and considerably more at the third; and they were nearly equivalent in labor requirements. The following major conclusions were drawn from the study: (1) The advanced audit significantly increased heating energy savings. (2) Heating energy savings of around 33% were achieved using the advanced audit with blower-door-directed air sealing. (3) The advanced audit appeared to increase cooling energy savings, although wide variances occurred. (4) As tested in North Carolina, the advanced audit overpredicted heating energy consumption and savings for houses with high heating loads. (5) The advanced audit did not increase weatherization costs and actually lowered costs for two of three weatherization agencies. (6) The advanced audit recommended some measures in near identical quantities to Retro-Tech-based weatherizations and others in dramatically different quantities. (7) Blower-door-directed air sealing more than doubled the air leakage reductions achieved from standard air sealing techniques. (8) Low-income houses in North Carolina had much higher average leakage rates than similar New York houses but were sealed as well or better.

  7. Preliminary Notice of Violation, University of Chicago - EA-2006...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chicago - EA-2006-02 Preliminary Notice of Violation, University of Chicago - EA-2006-02 March 7, 2006 Issued to the University of Chicago related to Nuclear Safety Program...

  8. Preliminary Notice of Violation, Westinghouse Savannah River Company- EA 98-09

    Broader source: Energy.gov [DOE]

    Preliminary Notice of Violation issued to Westinghouse Savannah River Company, related to Bioassay Program Deficiencies at the Savannah River Site, (EA-98-09)

  9. Association Loan Program

    Broader source: Energy.gov [DOE]

    The homeowners' association should submit a proposal to AHFC for preliminary approval. The forms to start this loan process are located on the program web site. Loan limits are determined on a...

  10. Preliminary Drill Sites

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    Preliminary locations for intermediate depth temperature gradient holes and/or resource confirmation wells based on compilation of geological, geophysical and geochemical data prior to carrying out the DOE-funded reflection seismic survey.

  11. Preliminary Drill Sites

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    2013-06-28

    Preliminary locations for intermediate depth temperature gradient holes and/or resource confirmation wells based on compilation of geological, geophysical and geochemical data prior to carrying out the DOE-funded reflection seismic survey.

  12. Environmental Externalities in Electric Power Markets: Acid Rain, Urban Ozone, and Climate Change

    Reports and Publications (EIA)

    1995-01-01

    This article discusses the emissions resulting from the generation of electricity by utilities and their role in contributing to the environmental problems of acid rain, urban ozone, and climate change.

  13. The Roles of Cloud Drop Effective Radius and LWP in Determining Rain

    Office of Scientific and Technical Information (OSTI)

    Properties in Marine Stratocumulus (Journal Article) | SciTech Connect The Roles of Cloud Drop Effective Radius and LWP in Determining Rain Properties in Marine Stratocumulus Citation Details In-Document Search Title: The Roles of Cloud Drop Effective Radius and LWP in Determining Rain Properties in Marine Stratocumulus Numerical simulations described in previous studies showed that adding cloud condensation nuclei to marine stratocumulus can prevent their breakup from closed into open

  14. Agenda: Preliminary Assessment Kickoff Meeting | Department of...

    Energy Savers [EERE]

    Agenda: Preliminary Assessment Kickoff Meeting Agenda: Preliminary Assessment Kickoff Meeting Document serves as the standard agenda for the preliminary assessment kickoff meeting....

  15. Preliminary Notice of Violation, Brookhaven Science Associates...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Notice of Violation, Stanford University - November 20, 2014 Preliminary Notice of Violation,Parsons Infrastructure & Technology Group, Inc. - WEA-2010-06 Preliminary ...

  16. PRELIMINARY ASSESSMENT TEMPLATE

    Broader source: Energy.gov [DOE]

    Document presents a template for the preliminary assessment (PA) that energy service companies (ESCOs) are required to conduct in an energy savings performance contract (ESPC) project under the U.S.Department of Energy's indefinite-delivery, indefinite-quantity ESPC contract.

  17. Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation

    Energy Savers [EERE]

    Plan | Department of Energy Preliminary Quality Assurance Implementation Plan Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation Plan The primary objective of this report is to determine whether the existing Fuel Cycle Technologies (FCT) Quality Assurance Program Document (QAPD) is sufficient for work to be performed in the Used Fuel Disposition Campaign (UFDC), and where the existing QAPD is not sufficient, supply recommendations for changes to the QAPD to

  18. Agenda: Preliminary Assessment Development Teleconference

    Broader source: Energy.gov [DOE]

    Document serves as a standard agenda for the teleconference to discuss the in-progress preliminary assessment.

  19. Effects of acid rain on apple tree productivity and fruit quality

    SciTech Connect (OSTI)

    Forsline, P.L.; Musselman, R.C.; Kender, W.J.; Dee, R.J.

    1983-01-01

    Mature 'McIntosh', 'Empire', and 'Golden Delicious' apple trees (Malus domestica Borkh.) were sprayed with simulated acid rain solutions in the pH range of 2.5 to 5.5 at full bloom in 1980 and in 1981. In 1981, weekly sprays were applied at pH 2.75 and pH 3.25. Necrotic lesions developed on apple petals at pH 2.5 with slight injury appearing at pH 3.0 and pH 3.5. Apple foliage had no acid rain lesions at any of the pH levels tested. Pollen germination was reduced at ph 2.5 in 'Empire'. Slight fruit set reduction at pH 2.5 was observed in 'McIntosh'. The incidence of russetting on 'Golden Delicious' fruits was ameliorated by the presence of rain-exclusion chambers but was not affected by acid rain. With season-long sprays at pH 2.75, there was a slight delay in maturity and lower weight of 'McIntosh' apples. Even at the lowest pH levels no detrimental effects of simulated acid rain were found on apple tree productivity and fruit quality when measured as fruit set, seed number per fruit, and fruit size and appearance.

  20. ARM - PI Product - Black Carbon aerosol mass concentration in snow and rain

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    samples over Barrow in the Arctic ProductsBlack Carbon aerosol mass concentration in snow and rain samples over Barrow in the Arctic ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send PI Product : Black Carbon aerosol mass concentration in snow and rain samples over Barrow in the Arctic [ ARM research ] Deposition of black carbon aerosol (BC) on snow (i.e. wet deposition) is considered to lower snow albedo and

  1. Brazilian rain forest security - environment - development. Study project report

    SciTech Connect (OSTI)

    Arruda, P.A.

    1993-03-25

    The Amazon region has been intensely discussed in the recent years. Most of these discussions have been highly influenced by interests groups. To understand the Amazon area we need to specify what the Amazon is, to describe the forest, to evaluate its mineral and biological resources, and to study the people living in the region. A security analysis reveals that there are no main threats to Brazilian Amazon. Nevertheless, narco guerrillas, acting in neighboring countries, can cross the borders and challenge regional authorities. First World interests may disturb Brazilian policies to the region. To face these threats, Brazilian armed forces maintain a well trained military sharing with other native people the security and the routes towards progress. Brazilian government is also implementing some programs to achieve a well balanced development. The new concepts of sustainable development are applied to keep the region's natural resources available for future generations. Among these programs this paper addresses the ecological economic zoning, Calha Norte Program and Amazon Protection System (SIPAM/SIVAM). In synthesis it demonstrates the Brazilian commitment to integrate, develop and preserve this rich and exotic region.

  2. Environmental Survey preliminary report

    SciTech Connect (OSTI)

    Not Available

    1988-04-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Sandia National Laboratories conducted August 17 through September 4, 1987. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with Sandia National Laboratories-Albuquerque (SNLA). The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at SNLA, and interviews with site personnel. 85 refs., 49 figs., 48 tabs.

  3. Preliminary Safety Design RM

    Office of Environmental Management (EM)

    Radiological Data Demonstrate Protectiveness at Formerly Utilized Sites Remedial Action Program Sites | Department of Energy Pre-MARSSIM Surveys in a MARSSIM World: Demonstrating How Pre-MARSSIM Radiological Data Demonstrate Protectiveness at Formerly Utilized Sites Remedial Action Program Sites Pre-MARSSIM Surveys in a MARSSIM World: Demonstrating How Pre-MARSSIM Radiological Data Demonstrate Protectiveness at Formerly Utilized Sites Remedial Action Program Sites Pre-MARSSIM Surveys in a

  4. PRELIMINARY Run Shutdown BL Commissioning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PRELIMINARY Run Shutdown BL Commissioning Maintenance AP SPEAR Down Injector Startup University Holidays Spear Down SPEAR Startup MA Sep Oct 2011 2012 MA Mar Apr May Jun Jul...

  5. Preliminary performance of HT datalink

    SciTech Connect (OSTI)

    Cieslewski, Grzegorz

    2014-02-11

    Preliminary performance of HT HS datalink at room temperature over 5000ft of wireline. The data shows ablility of the datalink to adapt by decreasing speed.

  6. Preliminary performance of HT datalink

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Cieslewski, Grzegorz

    Preliminary performance of HT HS datalink at room temperature over 5000ft of wireline. The data shows ablility of the datalink to adapt by decreasing speed.

  7. MRS Preliminary Site Requirements

    Broader source: Energy.gov [DOE]

    In the November 1989 Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program (DOE/RW-0247), the Secretary of Energy announced an initiative for developing a...

  8. Lochinvar Preliminary Plan Comments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lochinvar Preliminary Plan Comments Lochinvar Preliminary Plan Comments Comments to DOE on Certification, Compliance and Enforcement Regulations for Consumer Products and Commercial and Industrial Equipment EO 13563 Preliminary Plan PDF icon Microsoft Word - Lochinvar Comments -EO 13563 Preliminary Plan.docx More Documents & Publications Notice of Availability of Preliminary Plan for Retrospective Analysis of Existing Rules Regulatory Burden RFI AHRI Preliminary Plan for Retrospective

  9. Programs Planning to Do Evaluations | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Process Evaluation of the Better Buildings Neighborhood Program, Final Evaluation Volume 4 Preliminary Process and Market Evaluation February 13,...

  10. Preliminary Notice of Violation, BWXT Pantex, LLC - EA-2006-04...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Violation, BWXT Pantex LLC - EA-2005-02 Briefing, DOE's Official Use Only Program - June 2014 Preliminary Notice of Violation, Fluor Hanford Incorporated - EA-2005-07...

  11. Preliminary Notice of Violation, University of California- EA-2006-01

    Broader source: Energy.gov [DOE]

    Preliminary Notice of Violation issued to the University of California related to Radiological Uptakes, a Radioactive Material Spill, and Radiological Protection Program, Quality Assurance, and Safety Basis Deficiencies at the Lawrence Livermore National Laboratory

  12. Used Fuel Disposition Campaign Preliminary Quality Assurance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Quality Assurance Implementation Plan Used Fuel Disposition Campaign Preliminary Quality Assurance Implementation Plan The primary objective of this report is to ...

  13. Preliminary Notice of Violation, International Technology Corporation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corporation - EA-1999-01 More Documents & Publications Preliminary Notice of Violation, MOTA Corporation - EA-2000-03 Preliminary Notice of Violation, Sandia Corporation -...

  14. Preliminary Notice of Violation, Argonne National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - EA-1999-10 More Documents & Publications Preliminary Notice of Violation, MOTA Corporation - EA-2000-03 Preliminary Notice of Violation, Argonne National...

  15. Preliminary Notice of Violation, Sandia Corporation | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corporation Preliminary Notice of Violation, Sandia Corporation November 17,2015 Worker Safety and Health Enforcement Preliminary Notice of Violation issued to Sandia Corporation ...

  16. Preliminary Notice of Violation, Sandia Corporation - September...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Corporation - September 25, 2014 Preliminary Notice of Violation, Sandia Corporation - September 25, 2014 September 25, 2014 Worker Safety and Health Enforcement Preliminary Notice ...

  17. Preliminary Safety Design RM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Safety Design RM Preliminary Safety Design RM The Preliminary Safety Design (PSD) Review Module (RM) is a tool that assists DOE federal project review teams in evaluating the ...

  18. National Network for Manufacturing Innovation: A Preliminary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Network for Manufacturing Innovation: A Preliminary Design National Network for Manufacturing Innovation: A Preliminary Design The Federal investment in the National Network for ...

  19. Preliminary Notice of Violation, Washington Closure Hanford,...

    Energy Savers [EERE]

    LLC - WEA-2010-02 More Documents & Publications Preliminary Notice of Violation, Brookhaven Science Associates, LLC - WEA-2013-01 Preliminary Notice of Violation, Savannah...

  20. Preliminary Notice of Violation, National Security Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LLC - September 26, 2014 Preliminary Notice of Violation, National Security Technologies, LLC - September 26, 2014 September 26, 2014 Security Enforcement Preliminary Notice of...

  1. Installation Restoration Program (IRP) preliminary assessment of the 154th air control squadron. 154th air control squadron, Kekkaha Armory, Hawaii Air National Guard, Kekaha, Kauai, Hawaii. Final report

    SciTech Connect (OSTI)

    1995-01-01

    The document identifies ANGRC attempt to assess possible Installation Restoration Program sites at the station. The process involves research via personal interviews, record searches, review historic data, assessing `As Built Drawings`, aerial photographs, and a site visit. Site investigations of hazardous wastes, installation restoration, soil pollution, site investigations, fuel contamination at air force facilities.

  2. DOE/SC-ARM/TR-079 Disdrometer and Tipping Bucket Rain Gauge

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    79 Disdrometer and Tipping Bucket Rain Gauge Handbook MJ Bartholomew December 2009 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe

  3. (Rain)cloud computing: Researchers work to improve how we predict climate

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    change | Argonne National Laboratory (Rain)cloud computing: Researchers work to improve how we predict climate change By Louise Lerner * March 3, 2016 Tweet EmailPrint Rao Kotamarthi and Jiali Wang spend their days looking at a future Earth. At the U.S. Department of Energy's (DOE's) Argonne National Laboratory, the two scientists work on simulations and techniques to project what the climate will look like 100 years from now. Last year, they completed the highest resolution climate forecast

  4. Effects of acid rain on apple tree productivity and fruit quality

    SciTech Connect (OSTI)

    Forsline, P.L.; Musselman, R.C.; Kender, W.J.; Dee, R.J.

    1983-01-01

    Mature McIntosh, Empire, and Golden Delicious apple trees (Malus domestica) were sprayed with simulated acid rain solutions in the pH range of 2.5 to 5.5 at full bloom in 1980 and 1981. In 1981, weekly sprays were applied at pH 2.75 and pH 3.25. Necrotic lesions developed on apple petals at pH 2.5 with slight injury appearing at pH 3.0 and 3.5. Apple foliage had no acid rain lesions at any of the pH levels tested. Pollen germination was reduced at pH 2.5 in Empire. Slight fruit set reduction at pH 2.5 was observed in McIntosh. Even at the lowest pH levels no detrimental effects of simulated acid rain were found on apple tree productivity and fruit quality when measured as fruit set, seed number per fruit, and fruit size and appearance.

  5. Savannah River Ecology Laboratory - Outreach Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program

  6. Savannah River Ecology Laboratory - Outreach Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program

  7. The NO{sub x} Budget trading program: a collaborative, innovative approach to solving a regional air pollution problem

    SciTech Connect (OSTI)

    Napolitano, Sam; Stevens, Gabrielle; Schreifels, Jeremy; Culligan, Kevin

    2007-11-15

    The NO{sub x} Budget Trading Program showed that regional cap-and-trade programs are adaptable to more than one pollutant, time period, and geographic scale, and can achieve compliance results similar to the Acid Rain Program. Here are 11 specific lessons that have emerged from the experience. (author)

  8. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Alabama. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    The Alabama legislature has created the Public Service Commission which has general supervisory powers over utilities. The PSC consists of a president and two associates, who are elected to four-year terms. The PSC has no jurisdiction over municipal utilities and, as a result, local governments retain the power to regulate the operation of their municipally-owned utilities. Municipalities also retain their police power over streets and highways within their territory. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  9. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Missouri. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities in Missouri is vested in the Public Service Commission. The Commission is composed of five members who are appointed by the governor with the advice and consent of the senate. Commissioners are appointed for a term of six years. Commissioners must be free from any employment or pecuniary interests incompatible with the duties of the Commission. The Commission is charged with the general supervision of public utilities. The Public Service Commission Law passed in 1913, makes no provision for the regulation of public utilities by municipalities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  10. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Virginia. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilties is vested generally in the State Corporation Commission. The Commission is comprised of three members elected by a joint vote of the two houses of the general assembly. Commissioners serve six-year terms. They must be free from any employment or pecuniary interests in any company subject to the supervision and regulation of the Commission. The Commission is charged with the primary responsibility of supervising and regulating public utilities. However, local governments retain the power to grant franchises and otherwise regulate the use of streets and other public property. In addition, municipally-owned utilities are not within the jurisdiction of the Commission to the extent that they operate within corporate limits. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  11. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Indiana. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Public Service Commission of Indiana. The Commission is comprised of three members appointed by the governor. Commissioners are appointed for four-year terms. They must be free from any employment or pecuniary interest in any public utility. Indiana courts have stated that the Commission was created and vested with regulatory authority over public utilities in order to relieve these utilities from local regulation. Local governments do, however, have specific statutory authority to determine, by contract or ordinance, the quality and character of service to be provided by public utilities within the municipality. Local governments may also regulate the use of streets and other public property by public utilities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  12. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Tennessee. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Tennessee Public Service Commission has been designated by the legislature as the agency primarily responsible for the regulation of public utilities and carriers. The Commission is comprised of three members elected by the voters of the state. Each member of the Commission serves a six-year term. The Commission is given broad supervisory control over public utilities in the public utilities statute. Included under its authority is the power to determine whether a privilege or franchise granted to a public utility by a municipality is necessary and proper for the public convenience. No privilege or franchise is valid until it has been approved by the Commission. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  13. The biological diversity conservation district: A rain forest conservation tool for the future

    SciTech Connect (OSTI)

    Simons, M.

    1995-12-01

    Over the next twenty years, the Earth`s rain forests may decrease by forty percent! This paper presents a revolutionary corporate entity for the protection of those forests, the biological diversity conservation district (biodistricts). The underlying cause of rain forest destruction is unfettered competition for limited resources. The competitors are many: farmers, business, local and national governments, the biotechnology and ecotourism industries, multinational companies, public utilities, and indigenous groups. To varying degrees, all compete within the marketplace. biodistricts will bring together two forces once thought to be antithetical: conservation an development. They will be set up in corporate form, owned and controlled by groups claiming access to the forest resources. Because the various groups will fight for the same resources habitats, ecosystems, and genetic diversity-each will prevent the others from destroying them. The district members will ensure that all businesses maintain sustainable development practices because the economic success of the district depends upon the area`s natural beauty and biological diversity. This paper analyzes the effects on the culture, politics, economy and conservation there. It will conclude that the comprehensive approach taken by biodistricts is the only method for solving the problem of rain forest destruction; that it is economically feasible, culturally viable, and ethically defensible. By March 1, 1995, the paper will represent not only the culmination of eighteen months of research, writing and interviews regarding biological diversity conservation, but also the impetus to push the thinking of environmentalists and business persons in a new direction, perhaps the only direction that will allow the nations of the world to protect their forests for the next twenty years and beyond.

  14. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Ohio. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Public Utilities Commission (PUCO) is a body created by the Ohio State legislature to administer the provisions of the Ohio Public Utilities Act. It is composed of three commissioners appointed by the governor with the advice and consent of the senate. Once appointed, a commissioner serves for a six-year period. The PUCO is vested with the power and jurisdiction to supervise and regulate public utilities and railroads... . The term public utility includes every corporation, company, co-partnership, person or association, their lessees, trustees, or receivers, as defined in the Ohio Code. Among the various services enumerated in the Code under the definition of public utility are an electric light company; a gas company; a pipeline company transporting gas, oil or coal; a waterworks company; a heating or cooling company. The power to regulate public utilities is shared by the PUCO and municipal governments. The municipal regulatory authority is derived from the Ohio Constitution, statutory provisions, and municipal franchising authority. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  15. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Massachusetts. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Department of Public Utilities. The Department is under the supervision and control of a commission consisting of three members appointed by the governor for terms of four years. No more than two of the commissioners may be members of the same political party. Commissioners must be freee from any employment or financial interests which are incompatible with the duties of the Department. The Department is responsible for regulating public utilities. The Department is specifically granted general supervisory authority over all gas and electric companies. Specific provisions for the appeal of local decisions exist only in the case of a municipality's approval or disapproval of new operaions by an electric or gas company in a municipality already being served by another such utility. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  16. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Kentucky. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    Until April 1, 1979, the Public Service Commission had been vested with exclusive jurisdiction over the regulation of rates and service of utilities. As of that date two new agencies, the Energy Regulatory Commission (ERC) and the Utility Regulatory Commission (URC), have replaced the Public Service Commission. The ERC consists of three full-time members appointed by the governor for four year terms and is responsible for enforcing the provisions of the Kentucky statutes relating to electric and gas utilities. The three-member URC is responsible for enforcing the provisions relating to non-energy utilities such as telephone, sewer, and water utilities. The statutes vest all regulatory authority over public utilities in either the ERC or the URC. Local governments retain only the power to grant local franchises. However, it should be noted, that any utility owned or operated by a political subdivision of the state is exempt from regulation. Thus, local government has complete authority over utilities which are self-owned. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  17. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Washington. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Washinton State Constitution grants authority to the legislature to regulate railroads and other common carriers as well as telegraph and telephone companies in the state. No section of the constitution expressly provides for the regulation of electric, gas, water, or heating utilities. The authority to regulate public utilities is vested generally in the Utilities and Transportation Commission, formerly designated at the Public Service Commission. The Commission is composed of three members appointed by the governor, with the consent of the senate. The term of office for commissioners is six years. Recently enacted legislation provides for the implementation of tax incentives to encourage the development of cogeneration facilities in the state. This plan is to be administered by the Department of Revenue in conjunction with the Energy Office. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  18. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Nevada. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate the operatons of public utilities in Nevada is vested generally in the Public Service Commission. The Commission is comprised of three members appointed by the governor to four year terms. One of the members is designated by the governor to act as chairman and serves in that capacity at the pleasure of the governor. Commissioners must be free from employment or pecuniary interests which are incompatible with the duties of the Commission. Within the purview of its powers, the authority of the Commission supercedes that of local governments. Local governments play a role in regulating public utilities only through the exercise of their zoning and franchising powers. In addition, municipally-owned utilities are totally exempt from Commission control. No specific procedure is provided by which the decisions of local governments regarding utilities may be reviewed by the Commission. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  19. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Idaho. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The Idaho state legislature has created the Idaho Public Utilities Commission and has given the Commission the power and jurisdiction to supervise and regulate every public utility in the state. The Commission is comprised of three members appointed by the governor with the approval of the senate. Commissioners serve full time and are appointed for six year terms. No more than two of the members may be from the same political party. Title 61 of the Idaho Code, which establishes the Commission and delineates its powers, vests all regulatory responsibility in the Commission to the exclusion of local government. However, as an incident to their franchising power, municipalities may impose reasonable regulations on the use of their streets. The Idaho Supreme Court holds that the transfer of regulatory power over public utilities to the Commission did not diminish the powers and duties of municipalities to control and maintain their streets and alleys. Limited statutory authority also exists giving municipalities the power to regulate the fares, rates, rentals, or charges made for the service rendered under any franchise granted in such city, except such as are subject to regulation by the Public Utilities Commission. With the exception of this limited power, the Commission is the sole agency having regulatory power over Idaho public utilities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  20. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Louisiana. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Louisiana Public Service Commission, composed of five members elected by the general electorate and elected for six-year terms. The Commission is charged with regulating all public utilities and has such other regulatory authority as provided by law. The Commission, however, has no power to regulate a public utility owned, operated, or regulated on the effective data of this constitution (1921) by the governing authority of one or more political subdivisions unless the Commission is authorized to regulate these utilities by the electorate of the political subdivision involved. An additional statutory provision excludes all municipally-owned public utilities from Commission regulation. New Orleans has retained the regulatory authority which it held as of the effective date of the Louisiana Constitution. Therefore, the Commission exercises no regulatory powers over investor or municipally-owned utilities in New Orleans. A municipality is empowered to own and operate a revenue-producing public utility within or without its boundaries and it may sell and distribute the commodity or service of the public utility within or without its corporate limits and may establish rates, rules, and regulations with respect to the sale and distribution. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  1. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Texas. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities in Texas is generally vested in the Public Utilities Commission. The Commission is comprised of three members appointed by the governor, with the advice of at least two-thirds of the senate, for a six-year term. Prior to the passage of the Texas Public Utility Regulatory Act (PURA) in 1975, the power to regulate public utilities was vested almost exclusively in municipalities. Under PURA, municipalities retain exclusive original jurisdiction over all electric, water, and sewer utilities within the municipality. PURA provides that all regulations pertaining to public utilities promulgated by local regulatory agencies remain in effect unless they are superceded by Commission rules. The municipality's governing body is required to exercise its regulatory authority under rules and standards consistent with those promulgated by the Commission. The Commission has exclusive appellate jurisdiction to review orders and ordinances of regulatory municipalities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  2. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Mississippi. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities in Mississippi is vested generally in the Public Service Commission, composed of three members elected for four year terms from separate districts of the state. Within the purview of its powers, the authority of the Commission supersedes that of local governments. It is empowered to amend municipal franchises that contain provisions conflicting with its exclusive jurisdiction over the rates and standards of service of public utilities. Local governments play a role in regulating public utilities only through the exercise of their zoning and franchising powers. They may also operate their own utilities which are totally exempt from Commission control, unless they provide services more than one mile beyond their corporate boundaries. Other than a procedure in which certain provisions in municipal franchises may be subject to modification by the Commission, there is no process by which the decisions of local government respecting utilities are reviewed by the Commission. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  3. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in North Carolina. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    Under the Public Utilities Act of 1965, utilities in North Carolina are regulated by the State's Utility Commission. The Commission consists of seven members who are appointed by the governor, subject to confirmation by the General Assembly sitting in joint session. The Commissioners serve eight year terms and the governor designates one of the commissioners as chairman. The Commission has an office of the executive director, who is appointed to a six year term by the governor subject to confirmaion by the General Assembly. The executive director heads the Commission's public staff. The public staff's duties include reviewing, investigating, and making recommendations on utility rates and services and intervention on behalf of the public in proceedings affecting consumer rates and generating plant certification. The Commission has the same power to regulate the operation of privately-owned public utilities within municipalities as it has to control those ouside. The only power over privately-owned utilities reserved to the municipalities is the power to grant franchises. A municipality may maintain its own utility systems, and such systems are not subject to the control and jurisdiction of the Commission. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  4. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Illinois. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the Illinois Commerce Commission, comprised of five members appointed by the governor with the advice and consent of the senate and appointed for five year terms. They must be free from any employment or pecuniary interests in any business subject to regulation by the Commission. Local governments may exercise a large degree of regulatory authority over public utilities providing services within a municipality. The question of whether a municipality will exercise regulatory control over local public utilities must be put to the voters of the city. If the proposition is approved by a majority of the voters, the municipality may regulate services and rates and exercise most of the regulatory functions otherwise assigned to the Commission. If any public utility is dissatisfied with any action of a municipality, the utility is entitled to apply to the Commission for review of the action. On review, the Commission may take any determination which it deems just and reasonable. In addition, municipally-owned utilities are excluded specifically from the definition of public utility. These utilities are not within the jurisdiction of the Commission and are regulated locally. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  5. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in New York. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate public utilities is vested generally in the New York Public Service Commission. The Commission is composed of five members appointed by the governor with the advice and consent of the senate. Commissioners are appointed for six-year terms. Commissioners may not have any pecuniary or financial interest in any public utility. Local governing bodies are authorized to exercise such power, jurisdiction and authority in enforcing the laws of the state and the orders, rules, and regulations of the commission as may be prescribed by statute or by the commission with respect to public utilities. A Commission spokesman confirmed that no statutes have been passed pursuant to this provision and the Commission has not ceded any of its regulatory powers to local governments. With the exception of the granting of franchises and permits to use public ways, local governments exercise no regulatory powers over public utilities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  6. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in California. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.; Hejna, D.; Rielley, K.J.

    1980-01-01

    The Constitution of the State of California grants to the Legislature control over persons and private corporations that own or operate a line, plant, or system for the production, generation, or transmission of heat, light, water, or power to be furnished either directly or indirectly to or for the public. The Constitution establishes the Public Utilities Commission and grants certain specific powers to the PUC, including the power to fix rates, establish rules and prescribe a uniform system of accounts. The Constitution also recognizes that the Legislature has plenary power to confer additional authority and jurisdiction upon the PUC. The Constitution prohibits regulation by a city, county, or other municipal body of matters over which the Legislature has granted regulatory power to the PUC. This provision does not, however, impair the right of any city to grant franchises for public utilities. The California legislature has enacted the California Public Utilities Code and has designated the PUC as the agency to implement the regulatory provisions of the Code. The Public Utilities Commission consists of five members appointed by the governor and approved by the senate, a majority of the membership concurring, for staggered 6-year terms. Certain limited powers over the conduct of public utilities may still be exercised by municipalities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  7. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in New Jersey. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The authority to regulate the operations of public utilities in New Jersey is generally vested in the Board of Public Utilities. The Board is subsumed within the Department of Energy for administrative purposes, but functions largely independently of supervision or control by that agency. The Board is composed of three members who serve for six-year terms. They are appointed by the governor with the advice and consent of the senate. Within the purview of its powers, the authority of the Board supersedes that of local governments. The Board, for example, may grant exemptions from local zoning provisions, and has approving authority over privileges or franchises granted by municipalities to public utilities. The Board, however, cannot override the refusal of a municipality to grant consent to the initiation of operations by a public utility. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  8. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in South Dakota. Preliminary background report

    SciTech Connect (OSTI)

    Feurer, D A; Weaver, C L; Gallagher, K C; Hejna, D; Rielley, K J

    1980-01-01

    The South Dakota Public Utilities Commission is authorized by statute to regulate gas and electric utilities. The Commission consists of three elected commissioners each of whom serves for a six year term. The Commissioners are elected by district and each must, at the time of election, be a resident of the district from which he has been elected. Each Commissioner must reside in the state capital and devote his entire time to the duties of his office. The Commission is part of the Department of Commerce and Consumer Protection. Municipal power to regulate privately owned electric and gas public utilities was terminated in 1975. A municipally-owned electric utility has the authority to regulate the sale, use, and rates of electric power and energy which it provides. The Commission has no authority to regulate steam, heat, and refrigeration systems; that power resides in cities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.

  9. PRELIMINARY SURVEY O F INTERNATIONAL M INERALS AND CHEMICAL CORPORATION

    Office of Legacy Management (LM)

    Pk.. = "p' . PRELIMINARY SURVEY O F INTERNATIONAL M INERALS AND CHEMICAL CORPORATION M u lberry, F lorida I Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK.RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT O F ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program .-. _ ._-. .__._ ..-...- -. .,. _... I_-.-.- INTERNATIONAL MINERALS AND CHEMICAL CORPORATION

  10. PRELIMINARY SURVEY OF W. R. GRACE COMPANY Ridgewood, Florida

    Office of Legacy Management (LM)

    W. R. GRACE COMPANY Ridgewood, Florida Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program W. R. GRACE COMPANY Ridgewood, Florida At the request of the Department of Energy (DOE, then ERDA), a preliminary survey was performed at the W. R. Grace and Company,

  11. PRELIMINARY SURVEY OF WESTINGHOUSE ELECTRIC CORPORATION EAST PITTSBURGH, PENNSYLVANIA

    Office of Legacy Management (LM)

    WESTINGHOUSE ELECTRIC CORPORATION EAST PITTSBURGH, PENNSYLVANIA Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program WESTINGHOUSE ELECTRIC CORPORATION EAST PITTSBURGH, PENNSYLVANIA At the request of the Department of Energy (DOE, then ERDA), a preliminary survey

  12. PRELIMINARY SURVEY OF BRIDGEPORT BRASS COMPANY SEYMOUR, CONNECTICUT

    Office of Legacy Management (LM)

    BRIDGEPORT BRASS COMPANY SEYMOUR, CONNECTICUT Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program BRIDGEPORT BRASS COMPANY SEYMOUR, CONNECTICUT At the request of the Department of Energy (then ERDA), a preliminary survey was performed at the Bridgeport Brass

  13. Preliminary Notice of Violation, Westinghouse Savannah River...

    Broader source: Energy.gov (indexed) [DOE]

    River Company - EA-97-11 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 Preliminary Notice of Violation, Kaiser-Hill Company, LLC - EA-1999-06...

  14. Preliminary Notice of Violation, Argonne National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Ohio, Inc - EA-2001-03 Preliminary Notice of Violation, Argonne National Laboratory-East - EA-1999-10 Preliminary Notice of Violation, Kaiser-Hill Company, LLC - EA-2001-04...

  15. PRELIMINARY SURVEY OF THE UNION CARBIDE CORPORATION METALS DIVISION PLANT, NIAGARA FALLS, NEW YORK

    Office of Legacy Management (LM)

    e - .' N"lr 7% PRELIMINARY SURVEY OF THE UNION CARBIDE CORPORATION METALS DIVISION PLANT, NIAGARA FALLS, NEW YORK Work performed by the Health and Safety Research Division Oak Ridge Natjonal Laboratory Oak Ridge, Tennessee 37830 December 1980 OAK RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program PRELIMINARY SURVEY OF THE UNION CARBIDE CORPORATION METALS DIVISION PLANT, NIAGARA FALLS,

  16. National Nuclear Security Administration Fact Sheet Preliminary Notice of Violation: Worker Safety and Health Violations at

    Energy Savers [EERE]

    Nuclear Security Administration Fact Sheet Preliminary Notice of Violation: Worker Safety and Health Violations at Y-12 National Security Complex On May 27, 2015, the National Nuclear Security Administration (NNSA) issued a Preliminary Notice of Violation (PNOV) to Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) for violations of Department of Energy (DOE) worker safety and health program requirements. At the time of the events, B&W Y-12 was the management and operating

  17. NTSF Spring 2014 Preliminary Agenda | Department of Energy

    Office of Environmental Management (EM)

    4 Preliminary Agenda NTSF Spring 2014 Preliminary Agenda Preliminary Meeting Agenda PDF icon NTSF Spring 2014 Preliminary Agenda More Documents & Publications NTSF 2014 Meeting Agenda NTSF Spring 2010 Final Agenda NTSF 2013 Agenda

  18. Preliminary Framework for Human-Automation Collaboration

    SciTech Connect (OSTI)

    Oxstrand, Johanna Helene; Le Blanc, Katya Lee; Spielman, Zachary Alexander

    2015-09-01

    The Department of Energy’s Advanced Reactor Technologies Program sponsors research, development and deployment activities through its Next Generation Nuclear Plant, Advanced Reactor Concepts, and Advanced Small Modular Reactor (aSMR) Programs to promote safety, technical, economical, and environmental advancements of innovative Generation IV nuclear energy technologies. The Human Automation Collaboration (HAC) Research Project is located under the aSMR Program, which identifies developing advanced instrumentation and controls and human-machine interfaces as one of four key research areas. It is expected that the new nuclear power plant designs will employ technology significantly more advanced than the analog systems in the existing reactor fleet as well as utilizing automation to a greater extent. Moving towards more advanced technology and more automation does not necessary imply more efficient and safer operation of the plant. Instead, a number of concerns about how these technologies will affect human performance and the overall safety of the plant need to be addressed. More specifically, it is important to investigate how the operator and the automation work as a team to ensure effective and safe plant operation, also known as the human-automation collaboration (HAC). The focus of the HAC research is to understand how various characteristics of automation (such as its reliability, processes, and modes) effect an operator’s use and awareness of plant conditions. In other words, the research team investigates how to best design the collaboration between the operators and the automated systems in a manner that has the greatest positive impact on overall plant performance and reliability. This report addresses the Department of Energy milestone M4AT-15IN2302054, Complete Preliminary Framework for Human-Automation Collaboration, by discussing the two phased development of a preliminary HAC framework. The framework developed in the first phase was used as the basis for selecting topics to be investigated in more detail. The results and insights gained from the in-depth studies conducted during the second phase were used to revise the framework. This report describes the basis for the framework developed in phase 1, the changes made to the framework in phase 2, and the basis for the changes. Additional research needs are identified and presented in the last section of the report.

  19. Implications of the Clean Air Act acid rain title on industrial boilers

    SciTech Connect (OSTI)

    Maibodi, M. )

    1991-11-01

    This paper discusses the impacts of the 1990 Clean Air Act Amendments related to acid rain controls, as they apply to industrial boilers. Emphasis is placed on explaining the Title IV provisions of the Amendments that permit nonutility sources to participate in the SO{sub 2} allowance system. The allowance system, as it pertains to industrial boiler operators, is described, and the opportunities for operators to trade and/or sell SO{sub 2} emission credits is discussed. The paper also reviews flue gas desulfurization system technologies available for industrial boiler operators who may choose to participate in the system. Furnace sorbent injection, advanced silicate process, lime spray drying, dry sorbent injection, and limestone scrubbing are described, including statements of their SO{sub 2} removing capability, commercial status, and costs. Capital costs, levelized costs and cost-effectiveness are presented for these technologies.

  20. H. R. 5904: A Bill to amend the Internal Revenue Code of 1986 to provide tax relief to utilities installing acid rain reduction equipment, introduced in the House of Representatives, One Hundred First Congress, Second Session, October 23, 1990

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    This bill was introduced into the US House of Representatives on October 23, 1990 to control acid rain. This legislation focuses on tax credit for equipment to meet acid rain reduction standards, as well as tax-exempt financing of acid rain control property. In addition, a tax credit is issued for minerals used to reduce the sulfur in coal.

  1. Program Evaluation: Program Logic

    Broader source: Energy.gov [DOE]

    Logic modeling is a thought process program evaluators have found to be useful for at least forty years and has become increasingly popular with program managers during the last decade. A logic model presents a plausible and sensible model of how the program will work under certain environmental conditions to solve identified problems. The logic model can be the basis for a convincing story of the program's expected performance – telling stakeholders and others the problem the program focuses on and how it is uniquely qualified to address it. The elements of the logic model are resources, activities, outputs, short, intermediate and longer-term outcomes. Some add the customers reached, as well as the relevant external contextual influences, present before a program begins or appearing as the program is implemented.

  2. Preliminary Notice of Violation, Lawrence Livermore National...

    Broader source: Energy.gov (indexed) [DOE]

    Laboratory - EA-2003-04 More Documents & Publications Preliminary Notice of Violation, University of California - EA-2006-01 Type B Accident Investigation Board Report on the...

  3. AHRI Preliminary Plan for Retrospective Analysis | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Existing Rules Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory Burden RFI A.O. Smith Corporation Response to Preliminary Plan for Retrospective Analysis of

  4. National Nuclear Security Administration Fact Sheet Preliminary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Safety Violations at Los Alamos National Laboratory On August 25, 2015, the National Nuclear Security Administration (NNSA) issued a Preliminary Notice of Violation (PNOV)...

  5. Preliminary Notice of Violation, Lawrence Livermore National...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Preliminary Notice of Violation, Lawrence Livermore National Laboratory - EA-98-06 July 28, 1998 Issued to the University of California related to Criticality Safety and the...

  6. Preliminary Results of Investigating Precompound Emission of...

    Office of Scientific and Technical Information (OSTI)

    of Light Fragments in Spallation Reactions, Summer 2012 Citation Details In-Document Search Title: Preliminary Results of Investigating Precompound Emission of Light ...

  7. NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance...

    Broader source: Energy.gov (indexed) [DOE]

    partial sequence of events based upon Reliability Coordinator information available to ... PDF icon NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report More ...

  8. Preliminary Results of Investigating Precompound Emission of...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Preliminary Results of Investigating Precompound Emission of Light Fragments in Spallation Reactions, Summer 2012 Citation Details In-Document Search Title: ...

  9. Natural Gas: A Preliminary Summary 1999

    Reports and Publications (EIA)

    2000-01-01

    This special report provides preliminary natural gas data for 1999 which were reported on monthly surveys of the industry through December.

  10. Preliminary Notice of Violation, Washington Group International...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Group International - EA-2003-07 Preliminary Notice of Violation, Washington Group International - EA-2003-07 October 23, 2003 Issued to Washington Group International related to ...

  11. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Achievable (ALARA) deficiencies that contributed to unplanned worker uptakes and the spread of contamination at DOE's Savannah River Site. PDF icon Preliminary Notice of...

  12. Preliminary neutronics assessment of fully ceramic microencapsulated...

    Office of Scientific and Technical Information (OSTI)

    gas-cooled reactors Citation Details In-Document Search Title: Preliminary neutronics assessment of fully ceramic microencapsulated fuel in high-temperature gas-cooled ...

  13. DOD - Preliminary Screening Tool | Open Energy Information

    Open Energy Info (EERE)

    Screening Tool Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: DOD - Preliminary Screening Tool Abstract This webpage contains the DOD...

  14. Natural Gas: A Preliminary Summary 1998

    Reports and Publications (EIA)

    1999-01-01

    This special report provides preliminary natural gas data for 1998 which were reported on monthly surveys of the industry through December.

  15. California Gasoline Price Study, 2003 Preliminary Findings

    Reports and Publications (EIA)

    2003-01-01

    This is the preliminary report to Congressman Ose describing the factors driving California's spring 2003 gasoline price spike and the subsequent price increases in June and August.

  16. Preliminary Notice of Violation, Fluor Hanford, Incorporated...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hanford, Incorporated - EA-2002-03 Preliminary Notice of Violation, Fluor Hanford, Incorporated - EA-2002-03 August 12, 2002 Issued to Fluor Hanford, Incorporated, related to ...

  17. Preliminary Assessment Review for Federal ESPCs | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    File Download the Preliminary Assessment Review. More Documents & Publications Recognizing and Assigning ESPC Risks and Responsibilities Using the Risk, Responsibility, and ...

  18. Survival and distribution of Vibrio cholerae in a tropical rain forest stream

    SciTech Connect (OSTI)

    Perez-Rosas, N.; Hazen, T.C.

    1988-12-31

    For 12 months Vibrio cholerae and fecal coliforms were monitored along with 9 other water quality parameters at 12 sites in a rain forest watershed in Puerto Rico. Densities of V. cholerae and fecal coliforms were not significantly correlated even though the highest densities of both bacteria were found at a sewage outfall. High densities of V. cholerae were also found at pristine sites high in the watershed. V. cholerae and Escherichia coli were inoculated into membrane diffusion chambers, placed at two sites and monitored for 5 days on two different occasions. Two different direct count methods indicated that the density of E. coli and V. cholerae did not change significantly during the course of either study. Physiological activity, as measured by INT-reduction and relative nucleic acid composition declined for E. coli during the first 12 h then increased and remained variable during the remainder of the study. V. cholerae activity, as measured by relative nucleic acid concentrations, remained high and unchanged for the entire study. INT-reduction in V. cholerae declined initially but regained nearly all of it`s original activity within 48 h. This study suggests that V. cholerae is an indigenous organism in tropical freshwaters and that assays other than fecal coliforms or E. coli must be used for assessing public health risk in tropical waters.

  19. Utility of Social Modeling for Proliferation Assessment - Preliminary Assessment

    SciTech Connect (OSTI)

    Coles, Garill A.; Gastelum, Zoe N.; Brothers, Alan J.; Thompson, Sandra E.

    2009-06-01

    This Preliminary Assessment draft report will present the results of a literature search and preliminary assessment of the body of research, analysis methods, models and data deemed to be relevant to the Utility of Social Modeling for Proliferation Assessment research. This report will provide: 1) a description of the problem space and the kinds of information pertinent to the problem space, 2) a discussion of key relevant or representative literature, 3) a discussion of models and modeling approaches judged to be potentially useful to the research, and 4) the next steps of this research that will be pursued based on this preliminary assessment. This draft report represents a technical deliverable for the NA-22 Simulations, Algorithms, and Modeling (SAM) program. Specifically this draft report is the Task 1 deliverable for project PL09-UtilSocial-PD06, Utility of Social Modeling for Proliferation Assessment. This project investigates non-traditional use of social and cultural information to improve nuclear proliferation assessment, including nonproliferation assessment, proliferation resistance assessments, safeguards assessments and other related studies. These assessments often use and create technical information about the State’s posture towards proliferation, the vulnerability of a nuclear energy system to an undesired event, and the effectiveness of safeguards. This project will find and fuse social and technical information by explicitly considering the role of cultural, social and behavioral factors relevant to proliferation. The aim of this research is to describe and demonstrate if and how social science modeling has utility in proliferation assessment.

  20. Evaluation of Cloud-resolving and Limited Area Model Intercomparison Simulations using TWP-ICE Observations. Part 2: Rain Microphysics

    SciTech Connect (OSTI)

    Varble, Adam; Zipser, Edward J.; Fridlind, Ann; Zhu, Ping; Ackerman, Andrew; Chaboureau, Jean-Pierre; Fan, Jiwen; Hill, Adrian; Shipway, Ben; Williams, Christopher R.

    2014-12-27

    Ten 3D cloud-resolving model (CRM) simulations and four 3D limited area model (LAM) simulations of an intense mesoscale convective system observed on January 23-24, 2006 during the Tropical Warm Pool International Cloud Experiment (TWP-ICE) are compared with each other and with observations and retrievals from a scanning polarimetric radar, co-located UHF and VHF vertical profilers, and a Joss-Waldvogel disdrometer in an attempt to explain published results showing a low bias in simulated stratiform rainfall. Despite different forcing methodologies, similar precipitation microphysics errors appear in CRMs and LAMs with differences that depend on the details of the bulk microphysics scheme used. One-moment schemes produce too many small raindrops, which biases Doppler velocities low, but produces rain water contents (RWCs) that are similar to observed. Two-moment rain schemes with a gamma shape parameter (?) of 0 produce excessive size sorting, which leads to larger Doppler velocities than those produced in one-moment schemes, but lower RWCs than observed. Two moment schemes also produce a convective median volume diameter distribution that is too broad relative to observations and thus, may have issues balancing raindrop formation, collision coalescence, and raindrop breakup. Assuming a ? of 2.5 rather than 0 for the raindrop size distribution improves one-moment scheme biases, and allowing ? to have values greater than 0 may improve two-moment schemes. Under-predicted stratiform rain rates are associated with under-predicted ice water contents at the melting level rather than excessive rain evaporation, in turn likely associated with convective detrainment that is too high in the troposphere and mesoscale circulations that are too weak. In addition to stronger convective updrafts than observed, limited domain size prevents a large, well-developed stratiform region from developing in CRMs, while a dry bias in ECMWF analyses does the same to the LAMs.

  1. Preliminary hazards analysis -- vitrification process

    SciTech Connect (OSTI)

    Coordes, D.; Ruggieri, M.; Russell, J.; TenBrook, W.; Yimbo, P.

    1994-06-01

    This paper presents a Preliminary Hazards Analysis (PHA) for mixed waste vitrification by joule heating. The purpose of performing a PHA is to establish an initial hazard categorization for a DOE nuclear facility and to identify those processes and structures which may have an impact on or be important to safety. The PHA is typically performed during and provides input to project conceptual design. The PHA is then followed by a Preliminary Safety Analysis Report (PSAR) performed during Title 1 and 2 design. The PSAR then leads to performance of the Final Safety Analysis Report performed during the facility`s construction and testing. It should be completed before routine operation of the facility commences. This PHA addresses the first four chapters of the safety analysis process, in accordance with the requirements of DOE Safety Guidelines in SG 830.110. The hazards associated with vitrification processes are evaluated using standard safety analysis methods which include: identification of credible potential hazardous energy sources; identification of preventative features of the facility or system; identification of mitigative features; and analyses of credible hazards. Maximal facility inventories of radioactive and hazardous materials are postulated to evaluate worst case accident consequences. These inventories were based on DOE-STD-1027-92 guidance and the surrogate waste streams defined by Mayberry, et al. Radiological assessments indicate that a facility, depending on the radioactive material inventory, may be an exempt, Category 3, or Category 2 facility. The calculated impacts would result in no significant impact to offsite personnel or the environment. Hazardous materials assessment indicates that a Mixed Waste Vitrification facility will be a Low Hazard facility having minimal impacts to offsite personnel and the environment.

  2. ORNL/luSA-85/6 Health and Safety Research Division PRELIMINARY RADIOLOGICAL SURVEY OF TEE FORMER HAVENS PLANT

    Office of Legacy Management (LM)

    luSA-85/6 Health and Safety Research Division PRELIMINARY RADIOLOGICAL SURVEY OF TEE FORMER HAVENS PLANT OF TEE BRIDGEPORT BRASS COMPANY, BRIDGEPORT, CONNECTICUT May 1985 Work performed as part of the RADIOLOGICAL SURVEY ACCIVITIES PROGRAM OAK RIDGE NATIONAL LABORATORY Oak Ridge, Tennessee 37831 operated by MARTIN MARIETTA ENERGY SYSTEMS, INC. for the U. S. DEPARTMENT OF ENERGY under Contract No. DE-AC05-840R21400 \ .-l__--.-- -- PRELIMINARY RADIOLOGICAL SURVEY OF THE FORMER HAVENS PLAEJT OF THE

  3. NSLS-II Preliminary Design Report

    SciTech Connect (OSTI)

    Dierker, S.

    2007-11-01

    Following the CD0 approval of the National Synchrotron Light Source II (NSLS-II) during August 2005, Brookhaven National Laboratory prepared a conceptual design for a worldclass user facility for scientific research using synchrotron radiation. DOE SC review of the preliminary baseline in December 2006 led to the subsequent CD1 approval (approval of alternative selection and cost range). This report is the documentation of the preliminary design work for the NSLS-II facility. The preliminary design of the Accelerator Systems (Part 1) was developed mostly based of the Conceptual Design Report, except for the Booster design, which was changed from in-storage-ring tunnel configuration to in external- tunnel configuration. The design of beamlines (Part 2) is based on designs developed by engineering firms in accordance with the specification provided by the Project. The conventional facility design (Part 3) is the Title 1 preliminary design by the AE firm that met the NSLS-II requirements. Last and very important, Part 4 documents the ES&H design and considerations related to this preliminary design. The NSLS-II performance goals are motivated by the recognition that major advances in many important technology problems will require scientific breakthroughs in developing new materials with advanced properties. Achieving this will require the development of new tools that will enable the characterization of the atomic and electronic structure, chemical composition, and magnetic properties of materials, at nanoscale resolution. These tools must be nondestructive, to image and characterize buried structures and interfaces, and they must operate in a wide range of temperatures and harsh environments. The NSLS-II facility will provide ultra high brightness and flux and exceptional beam stability. It will also provide advanced insertion devices, optics, detectors, and robotics, and a suite of scientific instruments designed to maximize the scientific output of the facility. Together these will enable the study of material properties and functions with a spatial resolution of {approx}1 nm, an energy resolution of {approx}0.1 meV, and the ultra high sensitivity required to perform spectroscopy on a single atom. In order to meet this need, NSLS-II has been designed to provide world-leading brightness and flux and exceptional beam stability. The brightness is defined as the number of photons emitted per second, per photon energy bandwidth, per solid angle, and per unit source size. Brightness is important because it determines how efficiently an intense flux of photons can be refocused to a small spot size and a small divergence. It scales as the ring current and the number of total periods of the undulator field (both of which contribute linearly to the total flux), as well as eing nversely proportional to the horizontal and vertical emittances (the product of beam size and divergence) of the electron beam. Raising the current in the storage ring to obtain even brighter beams is ultimately limited by beam-driven, collective instabilities in the accelerator. Thus, to maximize the brightness, the horizontal and vertical emittances must be made as small as possible. With the concept of using damping wigglers, low-field bending magnets, and a large number of lattice cells to achieve ultra small emittance, the performance of NSLS-II will be nearly at the ultimate limit of storage ring light sources, set by the intrinsic properties of the synchrotron radiation process. The facility will produce x-rays more than 10,000 times brighter than those produced at NSLS today. The facility, with various insertion devices, including three-pole-wigglers and low-field dipole radiations, has the capability of covering a broad range of radiation spectra, from hard x-ray to far infra-red. The superlative character and combination of capabilities will have broad impact on a wide range of disciplines and scientific initiatives in the coming decades, including new studies of small crystals in structural biology, a wide range of nanometer-resolution probes for nanoscience, coherent imaging of the structure and dynamics of disordered materials, greatly increased applicability of inelastic x-ray scattering, and properties of materials under extreme conditions. Commissioned in 1982, the existing National Synchrotron Light Source (NSLS) provides essential scientific tools for 2,300 scientists per year from more than 400 academic, industrial, and government institutions. Their myriad research programs produce about 800 publications per year, with more than 130 appearing in premier journals. It was designed in the 1970s and is now in its third decade of service. It has been continually upgraded over the years, with the brightness increasing fully five orders of magnitude. However, it has reached the theoretical limits of performance given its small circumference and small periodicity, and only a small number of insertion devices are possible.

  4. Dimethyl sulfide in the Amazon rain forest: DMS in the Amazon

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Jardine, K.; Yañez-Serrano, A. M.; Williams, J.; Kunert, N.; Jardine, A.; Taylor, T.; Abrell, L.; Artaxo, P.; Guenther, A.; Hewitt, C. N.; et al

    2015-01-08

    Surface-to-atmosphere emissions of dimethyl sulfide (DMS) may impact global climate 44 through the formation of gaseous sulfuric acid, which can yield secondary sulfate 45 aerosols and contribute to new particle formation. While oceans are generally 46 considered the dominant source of DMS, a shortage of ecosystem observations prevents 47 an accurate analysis of terrestrial DMS sources. Using mass spectrometry, we quantified 48 ambient DMS mixing ratios within and above a primary rainforest ecosystem in the 49 central Amazon Basin in real-time (2010-2011) and at high vertical resolution (2013-50 2014). Elevated but highly variable DMS mixing ratios were observed within themore » 51 canopy, showing clear evidence of a net ecosystem source to the atmosphere during 52 both day and night in both the dry and wet seasons. Periods of high DMS mixing ratios 53 lasting up to 8 hours (up to 160 ppt) often occurred within the canopy and near the 54 surface during many evenings and nights. Daytime gradients showed mixing ratios (up 55 to 80 ppt) peaking near the top of the canopy as well as near the ground following a rain 56 event. The spatial and temporal distribution of DMS suggests that ambient levels and 57 their potential climatic impacts are dominated by local soil and plant emissions. A soil 58 source was confirmed by measurements of DMS emission fluxes from Amazon soils as 59 a function of temperature and soil moisture. Furthermore, light and temperature 60 dependent DMS emissions were measured from seven tropical tree species. Our study 61 has important implications for understanding terrestrial DMS sources and their role in 62 coupled land-atmosphere climate feedbacks. 63« less

  5. Dimethyl sulfide in the Amazon rain forest: DMS in the Amazon

    SciTech Connect (OSTI)

    Jardine, K.; Yaez-Serrano, A. M.; Williams, J.; Kunert, N.; Jardine, A.; Taylor, T.; Abrell, L.; Artaxo, P.; Guenther, A.; Hewitt, C. N.; House, E.; Florentino, A. P.; Manzi, A.; Higuchi, N.; Kesselmeier, J.; Behrendt, T.; Veres, P. R.; Derstroff, B.; Fuentes, J. D.; Martin, S. T.; Andreae, M. O.

    2015-01-08

    Surface-to-atmosphere emissions of dimethyl sulfide (DMS) may impact global climate 44 through the formation of gaseous sulfuric acid, which can yield secondary sulfate 45 aerosols and contribute to new particle formation. While oceans are generally 46 considered the dominant source of DMS, a shortage of ecosystem observations prevents 47 an accurate analysis of terrestrial DMS sources. Using mass spectrometry, we quantified 48 ambient DMS mixing ratios within and above a primary rainforest ecosystem in the 49 central Amazon Basin in real-time (2010-2011) and at high vertical resolution (2013-50 2014). Elevated but highly variable DMS mixing ratios were observed within the 51 canopy, showing clear evidence of a net ecosystem source to the atmosphere during 52 both day and night in both the dry and wet seasons. Periods of high DMS mixing ratios 53 lasting up to 8 hours (up to 160 ppt) often occurred within the canopy and near the 54 surface during many evenings and nights. Daytime gradients showed mixing ratios (up 55 to 80 ppt) peaking near the top of the canopy as well as near the ground following a rain 56 event. The spatial and temporal distribution of DMS suggests that ambient levels and 57 their potential climatic impacts are dominated by local soil and plant emissions. A soil 58 source was confirmed by measurements of DMS emission fluxes from Amazon soils as 59 a function of temperature and soil moisture. Furthermore, light and temperature 60 dependent DMS emissions were measured from seven tropical tree species. Our study 61 has important implications for understanding terrestrial DMS sources and their role in 62 coupled land-atmosphere climate feedbacks. 63

  6. Preliminary Benchmarking and MCNP Simulation Results for Homeland...

    Office of Scientific and Technical Information (OSTI)

    Preliminary Benchmarking and MCNP Simulation Results for Homeland Security Citation Details In-Document Search Title: Preliminary Benchmarking and MCNP Simulation Results for ...

  7. Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Preliminary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Preliminary Evaluation Results Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Preliminary Evaluation Results This...

  8. ESPC ENABLE PRELIMINARY LETTER TO UNSUCCESSFUL ESCO OFFERORS...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PRELIMINARY LETTER TO UNSUCCESSFUL ESCO OFFERORS GUIDE AND TEMPLATE ESPC ENABLE PRELIMINARY LETTER TO UNSUCCESSFUL ESCO OFFERORS GUIDE AND TEMPLATE Document describes the...

  9. Preliminary Notice of Violation , Rocky Flats Environmental Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Violation , Rocky Flats Environmental Technology Site - EA-96-05 Preliminary Notice of Violation , Rocky Flats Environmental Technology Site - EA-96-05 October 7, 1996 Preliminary...

  10. Mixed-mode diesel HCCI with External Mixture Formation: Preliminary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mixed-mode diesel HCCI with External Mixture Formation: Preliminary Results Mixed-mode diesel HCCI with External Mixture Formation: Preliminary Results 2003 DEER Conference ...

  11. Preliminary Notice of Violation, Lockheed Martin Energy Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems - EA-2000-11 More Documents & Publications Preliminary Notice of Violation, Kaiser-Hill Company, LLC - EA-2001-04 Preliminary Notice of Violation, Westinghouse Savannah...

  12. Preliminary Notice of Violation, Babcock and Wilcox Technical...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Wilcox Technical Services Y-12, LLC Preliminary Notice of Violation, Babcock and Wilcox Technical Services Y-12, LLC January 28, 2016 Security Enforcement Preliminary Notice of ...

  13. Preliminary Notice of Violation, Babcock & Wilcox Technical Services...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Wilcox Technical Services Y-12, LLC Preliminary Notice of Violation, Babcock & Wilcox Technical Services Y-12, LLC May 27, 2015 Worker Safety and Health Enforcement Preliminary ...

  14. Preliminary Notice of Violation,Parsons Infrastructure & Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Preliminary Notice of Violation,Parsons Infrastructure & Technology Group, Inc. - WEA-2010-06 More Documents & Publications Preliminary Notice of Violation, Fluor-B&W ...

  15. Preliminary Notice of Violation, Battelle Energy Alliance, LLC...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - November 20, 2014 Preliminary Notice of Violation, Brookhaven Science Associates, LLC - WEA-2013-01 Preliminary Notice of Violation, Fluor-B&W Portsmouth, LLC - July 8, 201

  16. Preliminary Notice of Violation, Bechtel Hanford, Inc., - EA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Preliminary Notice of Violation, Bechtel Hanford, Inc. - EA-2002-04 More Documents & Publications Preliminary Notice of Violation, Fluor Hanford, Incorporated - EA-2002-03 ...

  17. Fact Sheet, Preliminary Notice of Violation: Four Hazardous Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sheet, Preliminary Notice of Violation: Four Hazardous Energy Control Events at LANL Fact Sheet, Preliminary Notice of Violation: Four Hazardous Energy Control Events at LANL On ...

  18. Better Buildings Neighborhood Program Lessons Learned (So Far) | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Lessons Learned (So Far) Better Buildings Neighborhood Program Lessons Learned (So Far) Presents lessons learned and key insights from program participants on planning and implementing residential energy efficiency programs. PDF icon Lessons Learned presentation More Documents & Publications An Update on the Better Buildings Neighborhood Program Process Evaluation of the Better Buildings Neighborhood Program, Final Evaluation Volume 4 Final Report Appendices: Preliminary

  19. Methodology for Preliminary Design of Electrical Microgrids

    SciTech Connect (OSTI)

    Jensen, Richard P.; Stamp, Jason E.; Eddy, John P.; Henry, Jordan M; Munoz-Ramos, Karina; Abdallah, Tarek

    2015-09-30

    Many critical loads rely on simple backup generation to provide electricity in the event of a power outage. An Energy Surety Microgrid TM can protect against outages caused by single generator failures to improve reliability. An ESM will also provide a host of other benefits, including integration of renewable energy, fuel optimization, and maximizing the value of energy storage. The ESM concept includes a categorization for microgrid value proposi- tions, and quantifies how the investment can be justified during either grid-connected or utility outage conditions. In contrast with many approaches, the ESM approach explic- itly sets requirements based on unlikely extreme conditions, including the need to protect against determined cyber adversaries. During the United States (US) Department of Defense (DOD)/Department of Energy (DOE) Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS) effort, the ESM methodology was successfully used to develop the preliminary designs, which direct supported the contracting, construction, and testing for three military bases. Acknowledgements Sandia National Laboratories and the SPIDERS technical team would like to acknowledge the following for help in the project: * Mike Hightower, who has been the key driving force for Energy Surety Microgrids * Juan Torres and Abbas Akhil, who developed the concept of microgrids for military installations * Merrill Smith, U.S. Department of Energy SPIDERS Program Manager * Ross Roley and Rich Trundy from U.S. Pacific Command * Bill Waugaman and Bill Beary from U.S. Northern Command * Melanie Johnson and Harold Sanborn of the U.S. Army Corps of Engineers Construc- tion Engineering Research Laboratory * Experts from the National Renewable Energy Laboratory, Idaho National Laboratory, Oak Ridge National Laboratory, and Pacific Northwest National Laboratory

  20. Hazardous waste cleanup: the preliminaries

    SciTech Connect (OSTI)

    Amos, K.

    1985-08-01

    This article describes the lengthiness and cost of the preliminary steps in a hazardous waste cleanup. The article describes the S-Area lawsuit, an area near Niagara Falls, New York which was an inactive chemical dump. Contaminated sludge was found at a nearby water treatment plant and was traced back to S-Area. In the past five years, S-Area negotiations have cost the U.S. Environmental Protection Agency two million dollars for advice on how work should proceed for the plant and the landfill. This lawsuit was one of the first in the U.S. against a chemical company for endangering the public through unsound waste disposal practices. Negotiation was selected instead of a trial for several reasons which are outlined. S-Area may serve as a model for other such settlements, as it provides for a flexible plan, open to consideration of alternate technologies that may be developed in the future. It contains a phased approach to both defining and evaluating existing problems, then suggesting remedies. It also requires monitoring for at least 35 years or until no danger remains.

  1. Weatherization Program

    Broader source: Energy.gov [DOE]

    Residences participating in the Home Energy Rebate or New Home Rebate Program may not also participate in the Weatherization Program.

  2. DRAFT/PRELIMINARY MEETING AGENDA

    Office of Environmental Management (EM)

    Nuclear Propulsion Program - State of West Virginia Transportation Exercise -Raymond English, DOEPNNR 11:00 a.m. - 12:30 p.m. Lunch (on your own) 12:30 p.m. - 2:30 p.m. Tribal...

  3. Preliminary results from Fermilab E789

    SciTech Connect (OSTI)

    Peng, J.C.; Boissevain, J.; Carey, T.A.; Jansen, D.M.; Jeppesen, R.; Kapustinsky, J.S.; Lane, D.W.; Leitch, M.J.; Lillberg, J.W.; McGaughey, P.L.; Moss, J.M. ); Brown, G.; Isenhower, D.; Sadler, M.; Schnathorst, R.; Schwindt, R. ); Gidal, G.; Ho, P.M.; Kowitt, M.S.I.; Luk, K.B.; Pripstein, D. (Lawrence Berkeley Lab., CA (Unite

    1992-01-01

    Fermilab experiment 789 studies low-multiplicity decays of neutral D and B mesons in a high-rate fixed-target environment. Preliminary results from the 1991 run are presented.

  4. Preliminary results from Fermilab E789

    SciTech Connect (OSTI)

    Peng, J.C.; Boissevain, J.; Carey, T.A.; Jansen, D.M.; Jeppesen, R.; Kapustinsky, J.S.; Lane, D.W.; Leitch, M.J.; Lillberg, J.W.; McGaughey, P.L.; Moss, J.M.; Brown, G.; Isenhower, D.; Sadler, M.; Schnathorst, R.; Schwindt, R.; Gidal, G.; Ho, P.M.; Kowitt, M.S.I.; Luk, K.B.; Pripstein, D.; Lederman, L.M.; Schub, M.H.; Brown, C.N.; Cooper, W.E.; Glass, H.D.; Gounder, K.N.; Mishra, C.S.; Apolinski, M.; Luebke, W.; Kaplan, D.M.; Martin, V.M.; Preston, R.S.; Sa, J.; Tanikella, V.; Childers, R.L.; Darden, C.W.; Snodgrass, D.; Wilson, J.R.; Chen, Y.C.; Kiang, G.C.; Teng, P.K.

    1992-12-01

    Fermilab experiment 789 studies low-multiplicity decays of neutral D and B mesons in a high-rate fixed-target environment. Preliminary results from the 1991 run are presented.

  5. Preliminary Notice of Violation, Westinghouse Savannah River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Intake between August 4, 1996, and February 10, 1997, by a Crane Operator at the Savannah River Site F-Canyon Preliminary Notice of Violation, EG&G Incorporated - EA-97-10...

  6. Renewable Energy Park - Preliminary Feasibility & Engineering Report

    SciTech Connect (OSTI)

    Ariwite, Roderick

    2015-07-31

    This "Renewable Energy Park - Preliminary Feasibility & Engineering Report" seeks to provide an overall assessment and review of renewable energy development opportunities on the Fallon Indian Reservation and Colony Lands.

  7. Hydrogen Infrastructure Market Readiness Workshop: Preliminary Results

    Broader source: Energy.gov [DOE]

    Preliminary results from the Hydrogen Infrastructure Market Readiness Workshop held February 16-17, 2011. This presentation was disseminated to workshop attendees to convey the aggregate and "raw" feedback collected during the workshop.

  8. National Electric Transmission Congestion Study: Preliminary Findings

    Broader source: Energy.gov [DOE]

    The Department hosted three webinars in August 2012 to receive input and suggestions concerning the preliminary findings of the National Electric Transmission Congestion Study. The updated presentation used in the webinars is now available.

  9. SEP Program Planning Template ("Program Planning Template") ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEP Program Planning Template ("Program Planning Template") SEP Program Planning Template ("Program Planning Template") Program Planning Template More Documents & Publications...

  10. Annual Energy Outlook 2014 Preliminary Results

    U.S. Energy Information Administration (EIA) Indexed Site

    Working Group 2 September 25, 2013 | Washington, DC By Trisha Hutchins and Nicholas Chase Office of Transportation Energy Consumption and Efficiency Analysis Annual Energy Outlook 2014: transportation modeling updates and preliminary results Overview 2 AEO2014 Transportation Working Group 2: Modeling updates and preliminary results Washington, D.C., September 25, 2013 Discussion purposes only - Do not cite or circulate * Macroeconomic drivers - GDP, population, world oil price * Light-duty

  11. Nutrient dynamics and nitrogen trace gas flux during ecosystem development in montane rain forest

    SciTech Connect (OSTI)

    Riley, R.H.; Vitousek, P.M.

    1995-01-01

    Patterns of nitrogen trace gas emissions, soil nitrogen flux, and nutrient availability were evaluated at five sites that form a chronosequence in Hawaiian montane rain forest. The estimated age of basaltic parent material from which soils developed at the Kilauea site was 200 yr, 6000 yr at the Puu Makaala site, 185000 yr at the Kohala site, 1.65 x 10{sup 6} yr at the Molokai site, and 4.5 x 10{sup 6} yr at the Kauai site. Peak net N mineralization and nitrification values were found in soils from the 185000-yr-old Kohala site. Nitrogen content of foliage and leaf litter was highest in the intermediate age sites (Puu Makaala and Kohala) and N and P retranslocation was lowest at the Puu Makaala site. Soil cores fertilized with nitrogen had significantly higher rates of root ingrowth than control cores at the two youngest sites (200 and 6000 yr old) but not in older sites (185000 and 4.5 x 10{sup 6}-yr-old sites) and total fine root growth into control cores was greatest at the Kohala site. The highest N{sub 2}O emissions were found at the 185000-yr-old Kohala site, while the highest combined flux of N{sub 2}O + NO was observed at the 4.5 x 10{sup 6}-yr-old Kauai site. While overall N{sub 2}O emission rates were correlated with rates of N transformations, soil water content appeared to influence the magnitude of emissions of N{sub 2}O and the ratios of emissions of NO vs. N{sub 2}O. N{sub 2}O emissions occurred when water-filled pore space (WFPS) values were >40%, with highest emissions in at least two sites observed at WFPS values of 75%. Among sites, high N{sub 2}O emissions were associated with high soil N transformation rates. Large NO fluxes were observed only at the Kauai site when WFPS values were <60%. 50 refs., 8 figs., 4 tabs.

  12. Preliminary Notice of Violation, National Security Technologies, LLC

    Broader source: Energy.gov [DOE]

    Worker Safety and Health Enforcement Preliminary Notice of Violation issued to National Security Technologies, LLC

  13. Demand-side management program evaluation and the EPA Conservation Verification Protocols. Final report

    SciTech Connect (OSTI)

    Willems, P.; Ciraulo, J.; Smith, B.

    1993-11-01

    The US Environmental Protection Agency (EPA) Conservation Verification Protocols (CVPs) are a set of step-by-step procedures for impact monitoring and evaluation of electric utility demand-side management (DSM) programs. The EPA developed these protocols as part of its mission to implement the Acid Rain Program authorized by Title IV of the Clean Air Amendments of 1990. This report provides an overview of the CVPs and how they can be used by electric utilities in DSM program monitoring and evaluation. Both the CVPs Monitoring Path and Stipulated Path procedures are summarized and reviewed. Several examples are provided to illustrate how to calculate DSM program energy savings using the CVPSs.

  14. DRAFT/PRELIMINARY MEETING AGENDA

    Office of Environmental Management (EM)

    U.S. DEPARTMENT OF ENERGY TRANSPORTATION EXTERNAL COORDINATION WORKING GROUP (TEC) MARCH 14-15, 2006 WASHINGTON, DC DAY 1 -Tuesday, March 14, 2006 BALLROOM FOYER 7:30 a.m. - 8:00 a.m. Continental Breakfast and Registration FRANKLIN ROOM 8:00 a.m. - 8:15 a.m. Welcome and Meeting Overview Judith Holm, Director, Operations Development Division, OCRWM/ONT 8:15 a.m. - 9:15 a.m. Plenary I - DOE Program Updates Office of Environmental Management - Dennis Ashworth, EM/OT Office of Civilian Radioactive

  15. DRAFT/PRELIMINARY MEETING AGENDA

    Office of Environmental Management (EM)

    DRAFT AGENDA U.S. DEPARTMENT OF ENERGY TRANSPORTATION EXTERNAL COORDINATION WORKING GROUP NEW ORLEANS, LOUISIANA JANUARY 29-30, 2002 Judith Holm, TEC Co-Chair, DOE-NTP Monday, January 28, 2002 4:00 - 6:00 p.m. Consolidated Grant Topic Group Meeting Judith Holm, DOE-National Transportation Program Tuesday, January 29, 2002 8:00 - 8:30 a.m. Continental Breakfast and General Registration Sue Martindale, Mary McConnell, SAIC 8:30 -12:00 p.m. Topic Group Meetings - Training and Medical Issues - Ella

  16. Preliminary evaluation of shale-oil resources in Missouri

    SciTech Connect (OSTI)

    Nuelle, L.M.; Sumner, H.S.

    1981-02-01

    This report is a preliminary overview of oil-shale potential in Missouri. Two types of oil shales occur in Missouri: (1) the platform marine type, represented by the Devonian Chattanooga Shale, and (2) black shales in Pennsylvanian cyclothems, many of which overlie currently mined coal beds. The Chattanooga Shale contains black, fissile, carbonaceous shales and reaches a thickness of around 70 ft in southwestern Missouri. Oil-yield data from Missouri are not available, but based on yields from other states, the Chattanooga of southwest Missouri is estimated to contain between 2.6 and 15.8 billion barrels of oil. Preliminary estimates of the black, hard, fissile, carbonaceous Pennsylvanian shales indicate they contain between 100 and 200 billion barrels of shale oil. Many of these units directly overlie currently mined coal seams and could be recovered with the coal, but they are now discarded as overburden. These shales also contain significant amounts of phosphates and uranium. Other Paleozoic units with limited oil-shale potential are the Ordovician Decorah and Maquoketa Formations and the Upper Devonian Grassy Creek Shale. Ambitious research programs are needed to evaluate Missouri oil-shale resources. Further investigations should include economic and technological studies and the drilling, mapping, and sampling of potential oil-shale units. Shrinking supplies of crude oil make such studies desirable.

  17. Environmental Survey preliminary report, Sandia National Laboratories, Livermore, California

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    This report contains the preliminary findings based on the first phase of an Environmental Survey at the Department of Energy (DOE) Sandia National Laboratories Livermore (SNLL), located at Livermore, California. The Survey is being conducted by DOE's Office of Environment, Safety and Health. The SNLL Survey is a portion of the larger, comprehensive DOE Environmental Survey encompassing all major operating facilities of DOE. The DOE Environmental Survey is one of a series of initiatives announced on September 18, 1985, by Secretary of Energy, John S. Herrington, to strengthen the environmental, safety, and health programs and activities within DOE. The purpose of the Environmental Survey is to identify, via a no fault'' baseline Survey of all the Department's major operating facilities, environmental problems and areas of environmental risk. The identified problem areas will be prioritized on a Department-wide basis in order of importance in 1989. The findings in this report are subject to modification based on the results from the Sampling and Analysis Phase of the Survey. The findings are also subject to modification based on comments from the Albuquerque Operations Office concerning the technical accuracy of the findings. The modified preliminary findings and any other appropriate changes will be incorporated into an Interim Report. The Interim Report will serve as the site-specific source for environmental information generated by the Survey, and ultimately as the primary source of information for the DOE-wide prioritization of environmental problems in the Survey Summary Report. 43 refs., 21 figs., 24 tabs.

  18. Program Administration

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21

    This volume describes program administration that establishes and maintains effective organizational management and control of the emergency management program. Canceled by DOE G 151.1-3.

  19. Visiting Faculty Program Program Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Visiting Faculty Program Program Description The Visiting Faculty Program seeks to increase the research competitiveness of faculty members and their students at institutions historically underrepresented in the research community in order to expand the workforce vital to Department of Energy mission areas. As part of the program, selected university/college faculty members collaborate with DOE laboratory research staff on a research project of mutual interest. Program Objective The program is

  20. AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

    SciTech Connect (OSTI)

    Not Available

    1984-11-15

    This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables.

  1. Preliminary Risk Assessment Associated with IGSCC of BWR Vessel Internals

    SciTech Connect (OSTI)

    A. Ware; K. Morton; M. Nitzel; N. Chokshi; T-Y. Chang

    1999-08-01

    BWR core shrouds and other reactor internals important to safety are experiencing intergranular stress corrosion cracking (IGSCC). The United States Nuclear Regulatory Commission (NRC) has followed the problem, and as part of its investigations, contracted with the Idaho National Engineering and Environmental Laboratory (INEEL) to conduct a risk assessment. The overall project objective is to assess the potential consequences and risks associated with the failure of IGSCC-susceptible BWR vessel internals, with specific consideration given to potential cascading and common mode effects. The paper presents an overview of the program, discusses the results of a preliminary qualitative assessment, and summarizes a simplified risk assessment that was conducted on sequences resulting from failures of jet pump components of a BWR/4 plant.

  2. Review of literature on the TMI accident and correlation to the LWR Safety Technology Program

    SciTech Connect (OSTI)

    Miller, W.J.

    1980-05-01

    This report is the result of approximately two man-months of effort devoted to assimilating and comprehending significant publicly available material related to Three Mile Island Unit 2 and events during and subsequent to the accident experienced on March 28, 1979. Those events were then correlated with the Preliminary LWR Safety Technology Program Plan (Preliminary Program Plan) prepared for the US Department of Energy by Sandia National Lab. This report is being submitted simultaneously with the SAI report entitled Preliminary Prioritization of Tasks in the Draft LWR Safety Technology Program Plan.

  3. Hydrothermal Liquefaction Treatment Preliminary Hazard Analysis Report

    SciTech Connect (OSTI)

    Lowry, Peter P.; Wagner, Katie A.

    2015-08-31

    A preliminary hazard assessment was completed during February 2015 to evaluate the conceptual design of the modular hydrothermal liquefaction treatment system. The hazard assessment was performed in 2 stages. An initial assessment utilizing Hazard Identification and Preliminary Hazards Analysis (PHA) techniques identified areas with significant or unique hazards (process safety-related hazards) that fall outside of the normal operating envelope of PNNL and warranted additional analysis. The subsequent assessment was based on a qualitative What-If analysis. This analysis was augmented, as necessary, by additional quantitative analysis for scenarios involving a release of hazardous material or energy with the potential for affecting the public.

  4. Visiting Faculty Program Program Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    covers stipend and travel reimbursement for the 10-week program. Teacherfaculty participants: 1 Program Coordinator: Scott Robbins Email: srobbins@lanl.gov Phone number: 663-5621...

  5. PRELIMINARY SURVEY OF AL-TECH SPECIALTY STEEL CORPORATION WATERVLIET, NEW YORK

    Office of Legacy Management (LM)

    . PRELIMINARY SURVEY OF AL-TECH SPECIALTY STEEL CORPORATION WATERVLIET, NEW YORK Work performed by the Health and Safety Research Division 3ak Ridge Natior!+l Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK RIDGE NATIONAL LABORATORY operated by lJNIuN CARBIDE CORPORATIOi; for the DEPARTMEI?T OF EI4ERGY as part of the Formerly Utilized Sites-- Remedial Action Program --, . -. I .__ . . __ .*l-..l- __. ..-_.-- - - _- - .-- AL-TECH SPECIALTY STEEL CORPORATION WATERVLIET, NEW YORK At the

  6. Fact Sheet Preliminary Notice of Violation: Classified Information Security Event at LANL

    Energy Savers [EERE]

    LANL On May 27, 2015 the National Nuclear Security Administration (NNSA) issued a Preliminary Notice of Violation (PNOV) to Los Alamos National Security, LLC (LANS) for violations of Department of Energy (DOE) classified information security program requirements. LANS is the management and operating contractor for NNSA's Los Alamos National Laboratory (LANL), located in Los Alamos, New Mexico. The PNOV cites three violations of Departmental classified information security requirements related to

  7. Fact Sheet Preliminary Notice of Violation: Classified Information Security Event at SNL

    Energy Savers [EERE]

    SNL On May 27, 2015, the National Nuclear Security Administration (NNSA) issued a Preliminary Notice of Violation (PNOV) to Sandia Corporation (Sandia) for violations of Department of Energy (DOE) classified information security program requirements. Sandia is the management and operating contractor for NNSA's Sandia National Laboratories (SNL), located in Albuquerque, New Mexico. The PNOV cites six violations of Departmental classified information security requirements related to a security

  8. National Nuclear Security Administration Fact Sheet Preliminary Notice of Violation: Worker Safety and Health Violations at

    Energy Savers [EERE]

    Sandia National Laboratories On November 17, 2015, the National Nuclear Security Administration (NNSA) issued a Preliminary Notice of Violation (PNOV) to Sandia Corporation (Sandia) for violations of Department of Energy (DOE) worker safety and health requirements. Sandia is the management and operating contractor for NNSA's Sandia National Laboratories (SNL) located in Albuquerque, New Mexico. The PNOV cites Sandia for deficiencies in implementation of worker safety and health program

  9. Clean coal technology demonstration program: Program update 1996-97

    SciTech Connect (OSTI)

    1997-10-01

    The Clean Coal Technology Demonstration Program (known as the CCT Program) reached a significant milestone in 1996 with the completion of 20 of the 39 active projects. The CCT Program is responding to a need to demonstrate and deploy a portfolio of technologies that will assure the U.S. recoverable coal reserves of 297 billion tons could continue to supply the nation`s energy needs economically and in a manner that meets the nation`s environmental objectives. This portfolio of technologies includes environmental control devices that contributed to meeting the accords on transboundary air pollution recommended by the Special Envoys on Acid Rain in 1986. Operational, technical, environmental, and economic performance information and data are now flowing from highly efficient, low-emission, advanced power generation technologies that will enable coal to retain its prominent role into the next millennium. Further, advanced technologies are emerging that will enhance the competitive use of coal in the industrial sector, such as in steelmaking. Coal processing technologies will enable the entire coal resource base to be used while complying with environmental requirements. These technologies are producing products used by utilities and industrial processes. The capability to coproduce products, such as liquid and solid fuels, electricity, and chemicals, is being demonstrated at a commercial scale by projects in the CCT Program. In summary, this portfolio of technologies is satisfying the national need to maintain a multifuel energy mix in which coal is a key component because of its low-cost, availability, and abundant supply within the nation`s borders.

  10. Property:NEPA PreliminaryEA-EISDate | Open Energy Information

    Open Energy Info (EERE)

    PreliminaryEA-EISDate Jump to: navigation, search Property Name NEPA PreliminaryEA-EISDate Property Type Date This is a property of type Date. Pages using the property "NEPA...

  11. Preliminary designs: passive solar manufactured housing. Technical status report

    SciTech Connect (OSTI)

    Not Available

    1980-05-12

    The criteria established to guide the development of the preliminary designs are listed. Three preliminary designs incorporating direct gain and/or sunspace are presented. Costs, drawings, and supporting calculations are included. (MHR)

  12. Preliminary Notice of Violation, Fluor-B&W Portsmouth, LLC -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Notice of Violation, Fluor-B&W Portsmouth, LLC - July 8, 2014 July 8, 2014 Worker Safety and Health Preliminary Notice of Violation issued to Fluor-B&W Portsmouth, LLC ...

  13. Preliminary Notice of Violation, URS-Washington Division - WEA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Consent Order, CH2M-WG Idaho, LLC - WCO-2011-01 Preliminary Notice of Violation, Brookhaven Science Associates, LLC - WEA-2013-01 Preliminary Notice of Violation, Fluor-B&W ...

  14. Preliminary Notice of Violation, UT-Battelle, LLC | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Associates, LLC - WEA-2013-01 Preliminary Notice of Violation, URS-Washington Division - WEA-2011-01 Preliminary Notice of Violation, Fluor-B&W Portsmouth, LLC - July 8, 2014

  15. Environmental radiological monitoring of air, rain, and snow on and near the Hanford Site, 1945-1957

    SciTech Connect (OSTI)

    Hanf, R.W.; Thiede, M.E.

    1994-03-01

    This report is a result of the Hanford Environmental Dose Reconstruction (HEDR) Project. The goal of the HEDR Project is to estimate the radiation dose that individuals could have received from emissions since 1944 at the Hanford Site near Richland, Washington. Members of the HEDR Project`s Environmental Monitoring Data Task have developed databases of historical environmental measurements of such emissions. Hanford documents were searched for information on the radiological monitoring of air, rain, and snow at and near the Hanford Site in Richland, Washington. The monitoring information was reviewed and summarized. The end product is a yearly overview of air, rain, and snow samples as well as ambient radiation levels in the air that were measured from 1945 through 1957. The following information is provided in each annual summary: the media sampled, the constituents (radionuclides) measured/reported, the sampling locations, the sampling frequencies, the sampling methods, and the document references. For some years a notes category is included that contains additional useful information. For the years 1948 through 1957, tables summarizing the sampling locations for the various sample media are also included in the appendix. A large number of documents were reviewed to obtain the information in this report. A reference list is attached to the end of each annual summary. All of the information summarized here was obtained from reports originating at Hanford. These reports are all publicly available and can be found in the Richland Operations Office (RL) public reading room. The information in this report has been compiled without analysis and should only be used as a guide to the original documents.

  16. Preliminary Technology Readiness Assessment (TRA) for the Calcine

    Energy Savers [EERE]

    Disposition Project Volume 1 (CDP) | Department of Energy 1 (CDP) Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP) Full Document and Summary Versions are available for download PDF icon Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP) PDF icon Summary - Preliminary TRA of the Calcine Disposition Project More Documents & Publications Compilation of TRA Summaries Preliminary Technology

  17. Preliminary Development of a Work Breakdown Structure (WBS) for Small

    Office of Scientific and Technical Information (OSTI)

    Modular Reactors (SMRs) (Technical Report) | SciTech Connect Preliminary Development of a Work Breakdown Structure (WBS) for Small Modular Reactors (SMRs) Citation Details In-Document Search Title: Preliminary Development of a Work Breakdown Structure (WBS) for Small Modular Reactors (SMRs) In summary, this preliminary WBS serves as an initial basis for the capital cost component of the economic analysis of SMRs. This preliminary WBS comes from the known WBS for existing, large nuclear power

  18. Preliminary Technology Readiness Assessment (TRA) for the Calcine

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Disposition Project Volume 1 (CDP) | Department of Energy Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP) Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP) Full Document and Summary Versions are available for download PDF icon Preliminary Technology Readiness Assessment (TRA) for the Calcine Disposition Project Volume 1 (CDP) PDF icon Summary - Preliminary TRA of the Calcine Disposition

  19. Program Automation

    Broader source: Energy.gov [DOE]

    Better Buildings Residential Network Data and Evaluation Peer Exchange Call Series: Program Automation, Call Slides and Discussion Summary, November 21, 2013. This data and evaluation peer exchange call discussed program automation.

  20. HVAC Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    New Commercial Program Development Commercial Current Promotions Industrial Federal Agriculture Heating Ventilation and Air Conditioning Energy efficient Heating Ventilation and...

  1. Retiree Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Library Services » Retiree Program Retiree Program The Research Library offers a 1 year library card to retired LANL employees that allows usage of Library materials. This service is only available to retired LANL employees. Who is eligible? Any Laboratory retiree, not participating in any other program (ie, Guest Scientist, Affiliate). Upon completion of your application, you will be notified of your acceptance into the program. This does not include past students. What is the term of the

  2. Program Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SciTech Connect Program Benefits of Individual EERE Programs. FY 2010 Citation Details In-Document Search Title: Program Benefits of Individual EERE Programs. FY 2010 This collection of data tables shows the benefits metrics related to energy security, environmental impacts, and economic impacts for individual renewable energy technologies in the EERE portfolio. Data are presented for the years 2015, 2020, 2030, and 2050, for both the NEMS and MARKAL models. Authors: None, None Publication

  3. Preliminary Phase Field Computational Model Development

    SciTech Connect (OSTI)

    Li, Yulan; Hu, Shenyang Y.; Xu, Ke; Suter, Jonathan D.; McCloy, John S.; Johnson, Bradley R.; Ramuhalli, Pradeep

    2014-12-15

    This interim report presents progress towards the development of meso-scale models of magnetic behavior that incorporate microstructural information. Modeling magnetic signatures in irradiated materials with complex microstructures (such as structural steels) is a significant challenge. The complexity is addressed incrementally, using the monocrystalline Fe (i.e., ferrite) film as model systems to develop and validate initial models, followed by polycrystalline Fe films, and by more complicated and representative alloys. In addition, the modeling incrementally addresses inclusion of other major phases (e.g., martensite, austenite), minor magnetic phases (e.g., carbides, FeCr precipitates), and minor nonmagnetic phases (e.g., Cu precipitates, voids). The focus of the magnetic modeling is on phase-field models. The models are based on the numerical solution to the Landau-Lifshitz-Gilbert equation. From the computational standpoint, phase-field modeling allows the simulation of large enough systems that relevant defect structures and their effects on functional properties like magnetism can be simulated. To date, two phase-field models have been generated in support of this work. First, a bulk iron model with periodic boundary conditions was generated as a proof-of-concept to investigate major loop effects of single versus polycrystalline bulk iron and effects of single non-magnetic defects. More recently, to support the experimental program herein using iron thin films, a new model was generated that uses finite boundary conditions representing surfaces and edges. This model has provided key insights into the domain structures observed in magnetic force microscopy (MFM) measurements. Simulation results for single crystal thin-film iron indicate the feasibility of the model for determining magnetic domain wall thickness and mobility in an externally applied field. Because the phase-field model dimensions are limited relative to the size of most specimens used in experiments, special experimental methods were devised to create similar boundary conditions in the iron films. Preliminary MFM studies conducted on single and polycrystalline iron films with small sub-areas created with focused ion beam have correlated quite well qualitatively with phase-field simulations. However, phase-field model dimensions are still small relative to experiments thus far. We are in the process of increasing the size of the models and decreasing specimen size so both have identical dimensions. Ongoing research is focused on validation of the phase-field model. Validation is being accomplished through comparison with experimentally obtained MFM images (in progress), and planned measurements of major hysteresis loops and first order reversal curves. Extrapolation of simulation sizes to represent a more stochastic bulk-like system will require sampling of various simulations (i.e., with single non-magnetic defect, single magnetic defect, single grain boundary, single dislocation, etc.) with distributions of input parameters. These outputs can then be compared to laboratory magnetic measurements and ultimately to simulate magnetic Barkhausen noise signals.

  4. Nevada potential repository preliminary transportation strategy Study 2. Volume 1

    SciTech Connect (OSTI)

    1996-02-01

    The objectives of this study were to build on the findings of the Nevada Potential Repository Preliminary Transportation Strategy Study 1 (CRWMS M&O 1995b), and to provide additional information for input to the repository environmental impact statement (EIS) process. In addition, this study supported the future selection of a preferred rail corridor and/or heavy haul route based on defensible data, methods, and analyses. Study research did not consider proposed legislation. Planning was conducted according to the Civilian Radioactive Waste Management Program Plan (DOE 1994a). The specific objectives of Study 2 were to: eliminate or reduce data gaps, inconsistencies, and uncertainties, and strengthen the analysis performed in Study 1; develop a preliminary list of rail route evaluation criteria that could be used to solicit input from stakeholders during scoping meetings. The evaluation criteria will be revised based on comments received during scoping; restrict and refine the width of the four rail corridors identified in Study 1 to five miles or less, based on land use constraints and engineering criteria identified and established in Study 2; evaluate national-level effects of routing spent nuclear fuel and high-level waste to the four identified branch lines, including the effects of routing through or avoiding Las Vegas; continue to gather published land use information and environmental data to support the repository EIS; continue to evaluate heavy haul truck transport over three existing routes as an alternative to rail and provide sufficient information to support the repository EIS process; and evaluate secondary uses for rail (passenger use, repository construction, shared use).

  5. Preliminary plan for treating mixed waste

    SciTech Connect (OSTI)

    Vandegrift, G.F.; Conner, C.; Hutter, J.C.; Leonard, R.A.; Nunez, L.; Sedlet, J.; Wygmans, D.G.

    1993-06-01

    A preliminary waste treatment plan was developed for disposing of radioactive inorganic liquid wastes that contain hazardous metals and/or hazardous acid concentrations at Argonne National Laboratory. This plan, which involves neutralization and sulfide precipitation followed by filtration, reduces the concentration of hazardous metals and the acidity so that the filtrate liquid is simply a low-level radioactive waste that can be fed to a low-level waste evaporator.

  6. Program Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Description SAGE, the Summer of Applied Geophysical Experience, is a unique educational program designed to introduce students in geophysics and related fields to "hands on" geophysical exploration and research. The program emphasizes both teaching of field methods and research related to basic science and a variety of applied problems. SAGE is hosted by the National Security Education Center and the Earth and Environmental Sciences Division of the Los Alamos National

  7. Program Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Description Inspiring girls to recognize their potential and pursue opportunities in science, technology, engineering and mathematics. Through Expanding Your Horizon (EYH) ...

  8. exercise program

    National Nuclear Security Administration (NNSA)

    and dispose of many different hazardous substances, including radioactive materials, toxic chemicals, and biological agents and toxins.

    There are a few programs NNSA uses...

  9. Counterintelligence Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-09-04

    To establish the policies, procedures, and specific responsibilities for the Department of Energy (DOE) Counterintelligence (CI) Program. This directive does not cancel any other directive.

  10. Counterintelligence Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-12-10

    The Order establishes Counterintelligence Program requirements and responsibilities for the Department of Energy, including the National Nuclear Security Administration. Supersedes DOE 5670.3.

  11. Program Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Applied Geophysical Experience, is a unique educational program designed to introduce students in geophysics and related fields to "hands on" geophysical exploration and research....

  12. Volunteer Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    National VolunteerMatch Retired and Senior Volunteer Program United Way of Northern New Mexico United Way of Santa Fe County Giving Employee Giving Campaign Holiday Food Drive...

  13. Programming Stage

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-05-21

    This chapter addresses plans for the acquisition and installation of operating environment hardware and software and design of a training program.

  14. Program Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    their potential and pursue opportunities in science, technology, engineering and mathematics. Through Expanding Your Horizon (EYH) Network programs, we provide STEM role models...

  15. Special Programs

    Office of Energy Efficiency and Renewable Energy (EERE)

    Headquarters Human Resources Operations promotes a variety of hiring flexibilities for managers to attract a diverse workforce, from Student Internship Program opportunities (Pathways), Veteran...

  16. Super Efficient Refrigerator Program (SERP) evaluation. Volume 1: Process evaluation

    SciTech Connect (OSTI)

    Sandahl, L.J.; Ledbetter, M.R.; Chin, R.I.; Lewis, K.S.; Norling, J.M.

    1996-01-01

    The Pacific Northwest National Laboratory (PNNL) conducted this study for the US Department of Energy (DOE) as part of the Super Efficient Refrigerator Program (SERP) Evaluation. This report documents the SERP formation and implementation process, and identifies preliminary program administration and implementation issues. The findings are based primarily on interviews with those familiar with the program, such as utilities, appliance manufacturers, and SERP administrators. These interviews occurred primarily between March and April 1995, when SERP was in the early stages of program implementation. A forthcoming report will estimate the preliminary impacts of SERP within the industry and marketplace. Both studies were funded by DOE at the request of SERP Inc., which sought a third-party evaluation of its program.

  17. State Energy Program & Weatherization Assistance Program: Update

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    eere.energy.gov AnnaMaria Garcia Acting Program Manager for DOE's Weatherization & Intergovernmental Program Weatherization and Intergovernmental Program State Energy Program & ...

  18. Tampa Electric Company, Polk Power Station Unit No. 1, preliminary public design report

    SciTech Connect (OSTI)

    1994-06-01

    This preliminary Public Design Report (PDR) provides design information about Tampa Electric Company`s Polk Power Station Unit No. 1, which will demonstrate in a commercial 250 MW unit the benefits of the integration of oxygen-blown, entrained-flow coal gasification with advanced combined cycle technology. This project is partially funded by the US Department of Energy (DOE) under Round III of its Clean Coal Technology (CCT) Program under the provisions of Cooperative Agreement between DOE and Tampa Electric Company, novated on March 5,1992. The project is highlighted by the inclusion of a new hot gas cleanup system. DOE`s project management is based at its Morgantown Energy Technology Center (METC) in West Virginia. This report is preliminary, and the information contained herein is subject to revision. Definitive information will be available in the final PDR, which will be published at the completion of detailed engineering.

  19. Student Internship Programs Program Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Student Internship Programs Program Description The objective of the Laboratory's student internship programs is to provide students with opportunities for meaningful hands- on experience supporting educational progress in their selected scientific or professional fields. The most significant impact of these internship experiences is observed in the intellectual growth experienced by the participants. Student interns are able to appreciate the practical value of their education efforts in their

  20. ADVANCED TURBINE SYSTEMS PROGRAM

    SciTech Connect (OSTI)

    Gregory Gaul

    2004-04-21

    Natural gas combustion turbines are rapidly becoming the primary technology of choice for generating electricity. At least half of the new generating capacity added in the US over the next twenty years will be combustion turbine systems. The Department of Energy has cosponsored with Siemens Westinghouse, a program to maintain the technology lead in gas turbine systems. The very ambitious eight year program was designed to demonstrate a highly efficient and commercially acceptable power plant, with the ability to fire a wide range of fuels. The main goal of the Advanced Turbine Systems (ATS) Program was to develop ultra-high efficiency, environmentally superior and cost effective competitive gas turbine systems for base load application in utility, independent power producer and industrial markets. Performance targets were focused on natural gas as a fuel and included: System efficiency that exceeds 60% (lower heating value basis); Less than 10 ppmv NO{sub x} emissions without the use of post combustion controls; Busbar electricity that are less than 10% of state of the art systems; Reliability-Availability-Maintainability (RAM) equivalent to current systems; Water consumption minimized to levels consistent with cost and efficiency goals; and Commercial systems by the year 2000. In a parallel effort, the program was to focus on adapting the ATS engine to coal-derived or biomass fuels. In Phase 1 of the ATS Program, preliminary investigators on different gas turbine cycles demonstrated that net plant LHV based efficiency greater than 60% was achievable. In Phase 2 the more promising cycles were evaluated in greater detail and the closed-loop steam-cooled combined cycle was selected for development because it offered the best solution with least risk for achieving the ATS Program goals for plant efficiency, emissions, cost of electricity and RAM. Phase 2 also involved conceptual ATS engine and plant design and technology developments in aerodynamics, sealing, combustion, cooling, materials, coatings and casting development. The market potential for the ATS gas turbine in the 2000-2014 timeframe was assessed for combined cycle, simple cycle and integrated gasification combined cycle, for three engine sizes. The total ATS market potential was forecasted to exceed 93 GW. Phase 3 and Phase 3 Extension involved further technology development, component testing and W501ATS engine detail design. The technology development efforts consisted of ultra low NO{sub x} combustion, catalytic combustion, sealing, heat transfer, advanced coating systems, advanced alloys, single crystal casting development and determining the effect of steam on turbine alloys. Included in this phase was full-load testing of the W501G engine at the McIntosh No. 5 site in Lakeland, Florida.

  1. Program Description | Robotics Internship Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 4, 2016. Apply Now for the Robotics Internship About the Internship Program Description Start of Appointment Renewal of Appointment End of Appointment Stipend Information...

  2. EEG's Preliminary Comments on Basis of Characterization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12-03 07,58 FROM,LM TECHNOLOGIES INC ID,5052343008 PAGE ENVIRONMENTAL EVALUATION GROUP , OPPORTUNrTY ( ~ nve ACTION 8'.1PlOYER 1007 WYOMING BOULEVARD, N.E. SUITE F-2 ALBUQUERQUE, NEW MEXICO 87100 (505) 828-1003 FAX (~) 826.1062 ~.:":o September 17, 1999 Dr -Ines Triay. Manager Carlsbad Area Office U-S. Department of Energy P.O. Box 3090 Carlsbad. NM 88221-3090 -,' '0,-. - Dear Dr. Triay: EEG's preliminary comments on the Fundamental Bases of the Characterizaf;on ReCfl.tirement... for

  3. Preliminary Design RM | Department of Energy

    Energy Savers [EERE]

    Design RM Preliminary Design RM The PD Review Module (RM) is a tool that assists DOE federal project review teams in evaluating the technical sufficiency of the PD prior to CD-2 approval. This PD RM can be applied anytime during the design prior to CD-2 approval. However, in practice, the design is typically review at the 30% design stage, which is corresponding to the end of the PD before initiation of final design. PDF icon Prelminary Design RM More Documents & Publications Final Design RM

  4. Emissions trading programs, making sense of the options

    SciTech Connect (OSTI)

    Fahrer, S.

    1996-03-01

    In an attempt to move away from the traditional command-and-control approach to regulation, the US Environmental Protection Agency has begun to develop economic incentive programs. These programs encourage compliance with nationwide pollution-reduction goals, but seek industry action based on market or profit incentives, rather than fear of retribution or penalty. The 1990 Clean Air Act Amendments (CAAA) require that stringent means be taken to reduce NOx pollution in so-called ozone-nonattainment areas. Under CAAA Title IV, the SO{sub 2} trading program went into effect in 1993 to reduce acid rain. For NO{sub x}, several programs are either already in operation, or are under development. These include the Cap and Trade program, the Open Market trading program and New Source Review Offset Trading program. These 3 programs are described. To obtain a Title V operating permit, issues to consider are operation, job descriptions, certification process, value, estimating future emissions, confidentiality, permits, inter-media coordination, costs, and publicity.

  5. Preliminary Notice of Violation, National Security Technologies, LLC -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 26, 2014 | Department of Energy LLC - September 26, 2014 Preliminary Notice of Violation, National Security Technologies, LLC - September 26, 2014 September 26, 2014 Security Enforcement Preliminary Notice of Violation issued to National Security Technologies, LLC On September 26, 2014, the National Nuclear Security Administration issued a Preliminary Notice of Violation (SEA-2014-02) to National Security Technologies, LLC (NSTec), for violations of Department of Energy's

  6. Preliminary Notice of Violation, Pacific Data Electric, Inc. - February 12,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 | Department of Energy Pacific Data Electric, Inc. - February 12, 2015 Preliminary Notice of Violation, Pacific Data Electric, Inc. - February 12, 2015 February 12, 2015 Worker Safety and Health Enforcement Preliminary Notice of Violation issued to Pacific Data Electric, Inc. On February 12, 2015, the U.S. Department of Energy (DOE) Office of Enterprise Assessments' Office of Enforcement issued a Preliminary Notice of Violation (WEA-2015-02) to Pacific Data Electric, Inc. (PDE) for

  7. S. 1234: A bill to amend the Internal Revenue Code of 1986 to provide tax relief to utilities installing acid rain reduction equipment, introduced in the Senate of the United States, One Hundred Second Congress, First Session, June 6, 1991

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    The bill would allow a tax credit of 6 2/3% of a taxpayer's investment in qualified acid rain control equipment for each of the three years beginning the year the equipment is placed in service. Additionally, a tax credit would be allowed during two years of construction progress, the amount being 6 2/3% of construction expenditures. The bill describes qualified acid rain property', tax-exempt financing of acid rain control property, tax credit for minerals used to reduce the sulfur in coal, coal cleaning minerals credit, exclusion from gross income of receipt of qualified Clean Air allowance and proceeds of disposition thereof, qualified Clean Air allowances, and amortization of acid rain control property.

  8. Preliminary Benchmarking and MCNP Simulation Results for Homeland...

    Office of Scientific and Technical Information (OSTI)

    Preliminary Benchmarking and MCNP Simulation Results for Homeland Security Citation ... Visit OSTI to utilize additional information resources in energy science and technology. A ...

  9. EV Everywhere Electric Drive Workshop: Preliminary Target-Setting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Publications EV Everywhere Battery Workshop: Preliminary Target-Setting Framework EV Everywhere ConsumerCharging Workshop: Target-Setting Framework and Consumer Behavior

  10. EV Everywhere Battery Workshop: Preliminary Target-Setting Framework...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EV Everywhere Electric Drive Workshop: Preliminary Target-Setting Framework EV Everywhere ConsumerCharging Workshop: Target-Setting Framework and Consumer Behavior EV Everywhere ...

  11. Notice of Availability of a Preliminary List of Standby Power...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Testing Guidelines, Federal Register, 66 FR 67517, December 31, 2001 Notice of Availability of a Preliminary List of Standby Power Products and Testing Guidelines, Federal ...

  12. February 13, 2013 Webinar: Preliminary Process and Market Evaluation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    February 13, 2013 Webinar: Preliminary Process and Market Evaluation - Better Buildings ... Home Performance with ENERGY STAR Webinar (text version) Discover the New Better Buildings ...

  13. Weekly Preliminary Crude Imports by Top 10 Countries of Origin...

    U.S. Energy Information Administration (EIA) Indexed Site

    Preliminary Crude Imports by Top 10 Countries of Origin (ranking based on 2013 Petroleum Supply Monthly data) (Thousand Barrels per Day) Period: Weekly 4-Week Average Download ...

  14. Controls on Fault-Hosted Fluid Flow: Preliminary Results from...

    Open Energy Info (EERE)

    Flow: Preliminary Results from the Coso Geothermal Field, CA Abstract cap rock, permeability, fault, fracture, clay, Coso Authors Davatzes, N.C.; Hickman and S.H. Published...

  15. PRELIMINARY SURVEY O F INTERNATIONAL M INERALS AND CHEMICAL CORPORATIO...

    Office of Legacy Management (LM)

    PRELIMINARY SURVEY O F INTERNATIONAL M INERALS AND CHEMICAL CORPORATION M u lberry, F ... ... I-.-.- INTERNATIONAL MINERALS AND CHEMICAL CORPORATION Mulberry, Florida At the ...

  16. EV Everywhere Electric Drive Workshop: Preliminary Target-Setting...

    Broader source: Energy.gov (indexed) [DOE]

    Workshop: Preliminary Target-Setting Framework Jacob Ward, Vehicle Technologies Senior Analyst July 24, 2012 Doubletree-Rosemont, Chicago, IL For this Analysis, Three "EV "...

  17. Notice of Availability of Preliminary Plan for Retrospective...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon NOAPreliminary2011.pdf More Documents & Publications AHAM Retrospective Preliminary Plan Sixth RFI Comment On Reducing Regulatory Burden Reducing Regulatory Burden EO ...

  18. Wet Gasification of Ethanol Residue: A Preliminary Assessment

    SciTech Connect (OSTI)

    Brown, Michael D.; Elliott, Douglas C.

    2008-09-22

    A preliminary technoeconomic assessment has been made of several options for the application of catalytic hydrothermal gasification (wet gasification) to ethanol processing residues.

  19. Lease of Power Privilege Flowchart: Award of Preliminary Lease...

    Open Energy Info (EERE)

    OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material: Lease of Power Privilege Flowchart: Award of Preliminary Lease through Award of...

  20. Example USFS Preliminary Section 4(e) Report | Open Energy Information

    Open Energy Info (EERE)

    4(e) Report Jump to: navigation, search OpenEI Reference LibraryAdd to library Personal Communication: Example USFS Preliminary Section 4(e) Report Abstract This letter...

  1. NNSA issues Preliminary Notice of Violation to National Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NSTec is the operating contractor of NNSA's Nevada National Security Site (NNSS) located 65 miles northwest of Las Vegas, Nevada. PDF icon Preliminary Notice of Violation, National ...

  2. Preliminary Technology Readiness Assessment (TRA) for the Calcine...

    Office of Environmental Management (EM)

    PRELIMINARY TECHNOLOGY OF THE CALCINE Prepared by the U.S. Department of Energy ECHNOLOGY READINESS ASSESSMENT ALCINE DISPOSITION PROJECT VOLUME TWO Anthony F. Kluk Hoyt C. Johnson ...

  3. The Pierre Auger Observatory Upgrade - Preliminary Design Report...

    Office of Scientific and Technical Information (OSTI)

    capabilities, with an emphasis on improved mass composition determination using the ... This Preliminary Design Report was produced by the Collaboration in April 2015 as an ...

  4. AEO 2015 Electricity, Coal, Nuclear and Renewables Preliminary...

    U.S. Energy Information Administration (EIA) Indexed Site

    Electricity, Coal, Nuclear and Renewables Preliminary Results For Joint Electricity, Coal, Nuclear, and Renewables AEO2015 Working Group September 15, 2014 | Washington, DC By EIA, ...

  5. Enhanced Accident Tolerant Fuels for LWRS - A Preliminary Systems...

    Office of Scientific and Technical Information (OSTI)

    Title: Enhanced Accident Tolerant Fuels for LWRS - A Preliminary Systems Analysis The severe accident at Fukushima Daiichi nuclear plants illustrates the need for continuous ...

  6. Community Wind Handbook/Understand Preliminary Siting | Open...

    Open Energy Info (EERE)

    * Submit Permit Applications * Find an Installer * Purchase Equipment * Plan for Maintenance Understand Preliminary Siting Wind turbines operate best in open areas with limited...

  7. Fully Ceramic Microencapsulated (FCM) Fuel in FHRs: A Preliminary...

    Office of Scientific and Technical Information (OSTI)

    Reactor Physics Assessment Citation Details In-Document Search Title: Fully Ceramic Microencapsulated (FCM) Fuel in FHRs: A Preliminary Reactor Physics Assessment ...

  8. Preliminary design study of small long life boiling water reactor...

    Office of Scientific and Technical Information (OSTI)

    boiling water reactor (BWR) with tight lattice thorium nitride fuel Citation Details In-Document Search Title: Preliminary design study of small long life boiling water reactor ...

  9. Preliminary Notice of Violation, URS Global Management & Operations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    URS Global Management & Operations Services - NEA-2011-04 Preliminary Notice of Violation, URS Global Management & Operations Services - NEA-2011-04 September 1, 2011 Issued to ...

  10. Preliminary Hazards Analysis Plasma Hearth Process

    SciTech Connect (OSTI)

    Aycock, M.; Coordes, D.; Russell, J.; TenBrook, W.; Yimbo, P.

    1993-11-01

    This Preliminary Hazards Analysis (PHA) for the Plasma Hearth Process (PHP) follows the requirements of United States Department of Energy (DOE) Order 5480.23 (DOE, 1992a), DOE Order 5480.21 (DOE, 1991d), DOE Order 5480.22 (DOE, 1992c), DOE Order 5481.1B (DOE, 1986), and the guidance provided in DOE Standards DOE-STD-1027-92 (DOE, 1992b). Consideration is given to ft proposed regulations published as 10 CFR 830 (DOE, 1993) and DOE Safety Guide SG 830.110 (DOE, 1992b). The purpose of performing a PRA is to establish an initial hazard categorization for a DOE nuclear facility and to identify those processes and structures which may have an impact on or be important to safety. The PHA is typically performed during and provides input to project conceptual design. The PRA then is followed by a Preliminary Safety Analysis Report (PSAR) performed during Title I and II design. This PSAR then leads to performance of the Final Safety Analysis Report performed during construction, testing, and acceptance and completed before routine operation. Radiological assessments indicate that a PHP facility, depending on the radioactive material inventory, may be an exempt, Category 3, or Category 2 facility. The calculated impacts would result in no significant impact to offsite personnel or the environment. Hazardous material assessments indicate that a PHP facility will be a Low Hazard facility having no significant impacts either onsite or offsite to personnel and the environment.

  11. Preliminary design for a maglev development facility

    SciTech Connect (OSTI)

    Coffey, H.T.; He, J.L.; Chang, S.L.; Bouillard, J.X.; Chen, S.S.; Cai, Y.; Hoppie, L.O.; Lottes, S.A.; Rote, D.M. ); Zhang, Z.Y. ); Myers, G.; Cvercko, A. ); Williams, J.R. )

    1992-04-01

    A preliminary design was made of a national user facility for evaluating magnetic-levitation (maglev) technologies in sizes intermediate between laboratory experiments and full-scale systems. A technical advisory committee was established and a conference was held to obtain advice on the potential requirements of operational systems and how the facility might best be configured to test these requirements. The effort included studies of multiple concepts for levitating, guiding, and propelling maglev vehicles, as well as the controls, communications, and data-acquisition and -reduction equipment that would be required in operating the facility. Preliminary designs for versatile, dual 2-MVA power supplies capable of powering attractive or repulsive systems were developed. Facility site requirements were identified. Test vehicles would be about 7.4 m (25 ft) long, would weigh form 3 to 7 metric tons, and would operate at speeds up to 67 m/s (150 mph) on a 3.3-km (2.05-mi) elevated guideway. The facility would utilize modular vehicles and guideways, permitting the substitution of levitation, propulsion, and guideway components of different designs and materials for evaluation. The vehicle would provide a test cell in which individual suspension or propulsion components or subsystems could be tested under realistic conditions. The system would allow economical evaluation of integrated systems under varying weather conditions and in realistic geometries.

  12. Business System Planning Project, Preliminary System Design

    SciTech Connect (OSTI)

    EVOSEVICH, S.

    2000-10-30

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time.

  13. Preliminary studies to determine the shelf life of HEPA filters

    SciTech Connect (OSTI)

    Gilbert, H.; Fretthold, J.K.; Rainer, F.; Bergman, W.; Beason, D.

    1994-07-18

    We have completed a preliminary study using filter media tests and filter qualification tests to investigate the effect of shelf-life on HEPA filter performance. Our media studies showed that the tensile strength decreased with age, but the data were not sufficient to establish a shelf-life. Thermogravimetric analyses demonstrated that one manufacturer had media with low tensile strength due to insufficient binder. The filter qualification tests (heated air and overpressure) conducted on different aged filters showed that filter age is not the primary factor affecting filter performance; materials and the construction design have a greater effect. An unexpected finding of our study was that sub-standard HEPA filters have been installed in DOE facilities despite existing regulations and filter qualification tests. We found that the filter with low tensile strength failed the overpressure test. The same filter had passed the heated air test, but left the filter so structurally weak, it was prone to blowout. We recommend that DOE initiate a filter qualification program to prevent this occurrence.

  14. Preliminary Field Evaluation of Mercury Control Using Combustion Modifications

    SciTech Connect (OSTI)

    V. Lissianski; P. Maly; T. Marquez

    2005-01-22

    In this project EER conducted a preliminary field evaluation of the integrated approach for mercury (Hg) and NO{sub x} control. The approach enhanced the 'naturally occurring' Hg capture by fly ash through combustion optimization, increasing carbon in ash content, and lowering ESP temperature. The evaluation took place in Green Station Units 1 and 2 located near Henderson, Kentucky and operated by Western Kentucky Energy. Units 1 and 2 are equipped with cold-side ESPs and wet scrubbers. Green Station Units 1 and 2 typically fire two types of fuel: a bituminous coal and a blend of bituminous coals based on availability. Testing of Hg emissions in Unit 2 without reburning system in operation and at minimum OFA demonstrated that efficiencies of Hg reduction downstream of the ESP were 30-40%. Testing also demonstrated that OFA system operation at 22% air resulted in 10% incremental increase in Hg removal efficiency at the ESP outlet. About 80% of Hg in flue gas at ESP outlet was present in the oxidized form. Testing of Hg emissions under reburning conditions showed that Hg emissions decreased with LOI increase and ESP temperature decrease. Testing demonstrated that maximum Hg reduction downstream of ESP was 40-45% at ESP temperatures higher than 300 F and 60-80% at ESP temperatures lower than 300 F. The program objective to demonstrate 80% Hg removal at the ESP outlet has been met.

  15. Science Programs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The focal point for basic and applied R&D programs with a primary focus on energy but also encompassing medical, biotechnology, high-energy physics, and advanced scientific ...

  16. Integrated Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Review (IPR) Quarterly Business Review (QBR) Access to Capital Debt Management July 2013 Aug. 2013 Sept. 2013 Oct. 2013 Nov. 2013 Dec. 2013 Jan. 2014 Feb. 2014 March...

  17. Programming models

    SciTech Connect (OSTI)

    Daniel, David J; Mc Pherson, Allen; Thorp, John R; Barrett, Richard; Clay, Robert; De Supinski, Bronis; Dube, Evi; Heroux, Mike; Janssen, Curtis; Langer, Steve; Laros, Jim

    2011-01-14

    A programming model is a set of software technologies that support the expression of algorithms and provide applications with an abstract representation of the capabilities of the underlying hardware architecture. The primary goals are productivity, portability and performance.

  18. Deconvolution Program

    Energy Science and Technology Software Center (OSTI)

    1999-02-18

    The program is suitable for a lot of applications in applied mathematics, experimental physics, signal analytical system and some engineering applications range i.e. deconvolution spectrum, signal analysis and system property analysis etc.

  19. Program Overview

    Broader source: Energy.gov [DOE]

    The culture of the DOE community will be based on standards. Technical standards will formally integrate part of all DOE facility, program and project activities. The DOE will be recognized as a...

  20. Conversion Preliminary Safety Analysis Report for the NIST Research Reactor

    SciTech Connect (OSTI)

    Diamond, D. J.; Baek, J. S.; Hanson, A. L.; Cheng, L-Y; Brown, N.; Cuadra, A.

    2015-01-30

    The NIST Center for Neutron Research (NCNR) is a reactor-laboratory complex providing the National Institute of Standards and Technology (NIST) and the nation with a world-class facility for the performance of neutron-based research. The heart of this facility is the NIST research reactor (aka NBSR); a heavy water moderated and cooled reactor operating at 20 MW. It is fueled with high-enriched uranium (HEU) fuel elements. A Global Threat Reduction Initiative (GTRI) program is underway to convert the reactor to low-enriched uranium (LEU) fuel. This program includes the qualification of the proposed fuel, uranium and molybdenum alloy foil clad in an aluminum alloy, and the development of the fabrication techniques. This report is a preliminary version of the Safety Analysis Report (SAR) that would be submitted to the U.S. Nuclear Regulatory Commission (NRC) for approval prior to conversion. The report follows the recommended format and content from the NRC codified in NUREG-1537, “Guidelines for Preparing and Reviewing Applications for the Licensing of Non-power Reactors,” Chapter 18, “Highly Enriched to Low-Enriched Uranium Conversions.” The emphasis in any conversion SAR is to explain the differences between the LEU and HEU cores and to show the acceptability of the new design; there is no need to repeat information regarding the current reactor that will not change upon conversion. Hence, as seen in the report, the bulk of the SAR is devoted to Chapter 4, Reactor Description, and Chapter 13, Safety Analysis.

  1. Program Leadership

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Leadership - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced

  2. Educational Programs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Educational Programs Educational Programs A collaboration between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Ellie Vigil (505) 667-2818 Email Administrative Assistant Rebecca Duran (505) 665-8899 Email There are two educational components to the Engineering Institute. The Los Alamos Dynamic

  3. Volunteer Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volunteer Program Volunteer Program Our good neighbor pledge includes active employee engagement in our communities through volunteering. More than 3,000 current and retired Lab employees have logged more than 1.8 million volunteer hours since 2007. August 19, 2015 LANL employee volunteers with Mountain Canine Corps Lab employee Debbi Miller volunteers for the Mountain Canine Corps with her search and rescue dogs. She also volunteers with another search and rescue organization: the Los Alamos

  4. Special Programs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Programs - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced Nuclear Energy

  5. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    SciTech Connect (OSTI)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  6. Fact Sheet Preliminary Notice of Violation: Classified Information Security Event at Y-12

    Energy Savers [EERE]

    Y-12 On January 28, 2016, the National Nuclear Security Administration (NNSA) issued a Preliminary Notice of Violation (PNOV) to Babcock and Wilcox Technical Services Y-12, LLC (B&W Y-12) for violations of Department of Energy (DOE) classified information security program requirements. B&W Y-12 was the management and operating contractor for NNSA's Y-12 National Security Complex (Y-12), located in Oak Ridge, Tennessee at the time of discovery of the security event. The PNOV cites three

  7. Preliminary survey and evaluation of nonaquifer thermal energy storage concepts for seasonal storage

    SciTech Connect (OSTI)

    Blahnik, D.E.

    1980-11-01

    Thermal energy storage enables the capture and retention of heat energy (or cold) during one time period for use during another. Seasonal thermal energy storage (STES) involves a period of months between the input and recovery of energy. The purpose of this study was to make a preliminary investigation and evaluation of potential nonaquifer STES systems. Current literature was surveyed to determine the state of the art of thermal energy storage (TES) systems such as hot water pond storage, hot rock storage, cool ice storage, and other more sophisticated concepts which might have potential for future STES programs. The main energy sources for TES principally waste heat, and the main uses of the stored thermal energy, i.e., heating, cooling, and steam generation are described. This report reviews the development of sensible, latent, and thermochemical TES technologies, presents a preliminary evaluation of the TES methods most applicable to seasonal storage uses, outlines preliminary conclusions drawn from the review of current TES literature, and recommends further research based on these conclusions. A bibliography of the nonaquifer STES literature review, and examples of 53 different TES concepts drawn from the literature are provided. (LCL)

  8. Student Internship Programs Program Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for a summer high school student to 75,000 for a Ph.D. student working full-time for a year. Program Coordinator: Scott Robbins Email: srobbins@lanl.gov Phone number: 663-5621...

  9. Chemical Cleaning Program Review

    Office of Environmental Management (EM)

    SRR-STI-2009-00464 2 Contents Regulatory drivers Process overview Preliminary results Lessons learned Path forward 3 Regulatory Drivers The Federal Facilities Agreement...

  10. Postdoctoral Program Program Description The Postdoctoral (Postdoc...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Postdoctoral Program Program Description The Postdoctoral (Postdoc) Research program offers the opportunity for appointees to perform research in a robust scientific R&D...

  11. Rain Machine (Solar Still)

    K-12 Energy Lesson Plans and Activities Web site (EERE)

    Working in groups, students build simple solar stills filled with salt water and observe what happens when the stills are placed in the sun. The students then taste the water they have collected and discuss what has happened in their stills.

  12. ARM - Cloud and Rain

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM Global Warming FAQ Just for Fun Meet our Friends Cool Sites Teachers Teachers' Toolbox ...

  13. ARM - Instrument - rain

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site TMP M1 Browse Data U. of Helsinki Research Station (SMEAR II), Hyytiala, Finland; AMF2 retired Originating instrument has been retired at this location Contact(s)...

  14. ARM - Datastreams - rain

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0:00 basetime Record with error unitless errorlatch ( time ) Frequency average, sensor 1 Hz frequency1 ( time ) Frequency average, sensor 2 Hz frequency2 ( time ) Frequency...

  15. ARM - Campaign Instrument - rain

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of the Green Ocean Amazon (GOAMAZON 2014) Download Data Manacapuru, Amazonas, Brazil; Mobile Facility, 2014.01.01 - 2014.12.31 Primary Measurements Taken The following...

  16. National Nuclear Security Administration Fact Sheet Preliminary...

    Energy Savers [EERE]

    Worker Safety and Health Program related to two events at Y-12: a worker exposure to lithium hydride and an unintentional discharge of a firearm inside a hardened patrol vehicle. ...

  17. Preliminary Notice of Violation, Stanford University - November...

    Office of Environmental Management (EM)

    worker safety and health program requirements (10 C.F.R. 851) relating to a series of laser and energetic beam events that occurred at DOE's SLAC National Accelerator Laboratory. ...

  18. Preliminary Notice of Violation, Stanford University - November...

    Broader source: Energy.gov (indexed) [DOE]

    worker safety and health program requirements (10 C.F.R. 851) relating to a series of laser and energetic beam events that occurred at DOE's SLAC National Accelerator Laboratory....

  19. National Nuclear Security Administration Fact Sheet Preliminary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    at 10 C.F.R. Part 851, Worker Safety and Health Program, associated with a lithium ion battery fire and an unexpected detonator initiation at SNL. NNSA identified four ...

  20. Thick Concrete Specimen Construction, Testing, and Preliminary Analysis

    SciTech Connect (OSTI)

    Clayton, Dwight A.; Hoegh, Kyle; Khazanovich, Lev

    2015-03-01

    The purpose of the U.S. Department of Energy Office of Nuclear Energy’s Light Water Reactor Sustainability (LWRS) Program is to develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the operating lifetimes of nuclear power plants (NPPs) beyond 60 years. Since many important safety structures in an NPP are constructed of concrete, inspection techniques must be developed and tested to evaluate the internal condition. In-service containment structures generally do not allow for the destructive measures necessary to validate the accuracy of these inspection techniques. This creates a need for comparative testing of the various nondestructive evaluation (NDE) measurement techniques on concrete specimens with known material properties, voids, internal microstructure flaws, and reinforcement locations. A preliminary report detailed some of the challenges associated with thick reinforced concrete sections and prioritized conceptual designs of specimens that could be fabricated to represent NPP concrete structures for using in NDE evaluation comparisons. This led to the construction of the concrete specimen presented in this report, which has sufficient reinforcement density and cross-sectional size to represent an NPP containment wall. Details on how a suitably thick concrete specimen was constructed are presented, including the construction materials, final nominal design schematic, as well as formwork and rigging required to safely meet the desired dimensions of the concrete structure. The report also details the type and methods of forming the concrete specimen as well as information on how the rebar and simulated defects were embedded. Details on how the resulting specimen was transported, safely anchored, and marked to allow access for systematic comparative NDE testing of defects in a representative NPP containment wall concrete specimen are also given. Data collection using the MIRA Ultrasonic NDE equipment and initial results are also presented along with a discussion of the preliminary findings. Comparative NDE of various defects in reinforced concrete specimens is a key component in identifying the most promising techniques and directing the research and development efforts needed to characterize concrete degradation in commercial NPPs. This requires access to the specimens for data collection using state-of-the-art technology. The construction of the specimen detailed in this report allows for an evaluation of how different NDE techniques may interact with the size and complexities of NPP concrete structures. These factors were taken into account when determining specimen size and features to ensure a realistic design. The lateral dimensions of the specimen were also chosen to mitigate unrealistic boundary effects that would not affect the results of field NPP concrete testing. Preliminary results show that, while the current methods are able to identify some of the deeper defects, improvements in data processing or hardware are necessary to be able to achieve the precision and reliability achieved in evaluating thinner and less heavily reinforced concrete structures.

  1. Characteristics of Strong Programs

    Broader source: Energy.gov [DOE]

    Existing financing programs offer a number of important lessons on effective program design. Some characteristics of strong financing programs drawn from past program experience are described below.

  2. START Program

    Broader source: Energy.gov [DOE]

    The Strategic Technical Assistance Response Team (START) Program is part of the DOE Office of Indian Energy effort to assist in the development of tribal renewable energy projects. Through START, Tribes in the 48 contiguous states and Alaska can apply for and are selected to receive technical assistance from DOE and national laboratory experts to move projects closer to implementation.

  3. Program Year 2008 State Energy Program Formula

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) State Energy Program (SEP), SEP Program Guidance Fiscal Year 2008, Program Year 2008, energy efficiency and renewable energy programs in the states, DOE Office of Energy Efficiency and Renewable Energy

  4. Fundamentals of successful monitoring, reporting, and verification under a cap-and-trade program

    SciTech Connect (OSTI)

    John Schakenbach; Robert Vollaro; Reynaldo Forte

    2006-11-15

    The U.S. Environmental Protection Agency (EPA) developed and implemented the Acid Rain Program (ARP), and NOx Budget Trading Programs (NBTP) using several fundamental monitoring, reporting, and verification (MRV) elements: (1) compliance assurance through incentives and automatic penalties; (2) strong quality assurance (QA); (3) collaborative approach with a petition process; (4) standardized electronic reporting; (5) compliance flexibility for low-emitting sources; (6) complete emissions data record required; (7) centralized administration; (8) level playing field; (9) publicly available data; (10) performance-based approach; and (11) reducing conflicts of interest. Each of these elements is discussed in the context of the authors' experience under two U.S. cap-and-trade programs and their potential application to other cap and-trade programs. The U.S. Office of Management and Budget found that the Acid Rain Program has accounted for the largest quantified human health benefits of any federal regulatory program implemented in the last 10 yr, with annual benefits exceeding costs by {gt} 40 to 1. The authors believe that the elements described in this paper greatly contributed to this success. EPA has used the ARP fundamental elements as a model for other cap-and-trade programs, including the NBTP, which went into effect in 2003, and the recently published Clean Air Interstate Rule and Clean Air Mercury Rule. The authors believe that using these fundamental elements to develop and implement the MRV portion of their cap-and-trade programs has resulted in public confidence in the programs, highly accurate and complete emissions data, and a high compliance rate. 2 refs.

  5. SunLine Transit Agency, Hydrogen-Powered Transit Buses: Preliminary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agency, Hydrogen-Powered Transit Buses: Preliminary Evaluation Results SunLine Transit Agency, Hydrogen-Powered Transit Buses: Preliminary Evaluation Results This paper provides...

  6. Preliminary upper limit on BR(D{sup {+-}}{r_arrow}{pi}{sup {...

    Office of Scientific and Technical Information (OSTI)

    Preliminary upper limit on BR(Dsup +-rarrowpisup +-musup +musup -) Citation Details In-Document Search Title: Preliminary upper limit on BR(Dsup ...

  7. Preliminary evaluation of environmental issues on the use of peat as an energy source

    SciTech Connect (OSTI)

    King, R.; Richardson, S.; Walters, A.; Boesch, L.; Thomson, W.; Irons, J.

    1980-03-14

    A study to characterize the environmental issues, that would arise from an extensive peat utilization program has been initiated. The objectives of this preliminary report are to: identify the environmental issues and potential problems; examine the significance of issues in the geographical regions where peat use could be developed; and establish a methodology by which issues can be resolved or clarified through future coordinated private, state, and federal programs. An overview of peat development including discussions on conversion technologies, extraction and harvesting procedures, and land reclamation is presented. Environmental concerns are in the areas of water resources and quality, air quality, health and safety issues, solid waste management, and land reclamation. The general environmental issues, resource availability, and attitudes associated with potential peat development in ten states, containing an estimated 90 percent of US peat resources were described. The ten states reviewed are Alaska, Minnesota, Michigan, Maine, North and South Carolina, Wisconsin, New York, Florida, and Louisiana. (DMC)

  8. The Department of Energy's Executive Order 13563 Preliminary Plan

    Energy Savers [EERE]

    Department of Energy's Executive Order 13563 Preliminary Plan Submitted on August 1, 2011 On behalf of the Natural Resources Defense Council and our more than 1.3 million members and online activists, we submit the following comments in response to the July 11 th request for comment on the April 29 th , 2011 Draft of the Department of Energy's (DOE) Preliminary Plan for Retrospective Analysis of Existing Rules ("Preliminary Plan"). (76 Federal Register 40646, July 11, 2011) NRDC has

  9. Environmental survey preliminary report, Mound Plant, Miamisburg, Ohio

    SciTech Connect (OSTI)

    Not Available

    1987-03-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Mound Plant, conducted August 18 through 29, 1986. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Mound Plant. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Mound Plant, and interviews with site personnel. The Survey found no environmental problems at the Mound Plant that represent an immediate threat to human life. The environmental problems identified at the Mound Plant by the Survey confirm that the site is confronted with a number of environmental problems which are by and large a legacy from past practices at a time when environmental problems were less well understood. Theses problems vary in terms of their magnitude and risk, as described in this report. Although the sampling and analysis performed by the Mound Plant Survey will assist in further identifying environmental problems at the site, a complete understanding of the significance of some of the environmental problems identified requires a level of study and characterization that is beyond the scope of the Survey. Actions currently under way or planned at the site, particularly the Phase II activities of the Comprehensive Environmental Analysis and Response Program (CEARP) as developed and implemented by the Albuquerque Operations Office, will contribute toward meeting this requirement. 85 refs., 24 figs., 20 tabs.

  10. Program Development

    SciTech Connect (OSTI)

    Atencio, Julian J.

    2014-05-01

    This presentation covers how to go about developing a human reliability program. In particular, it touches on conceptual thinking, raising awareness in an organization, the actions that go into developing a plan. It emphasizes evaluating all positions, eliminating positions from the pool due to mitigating factors, and keeping the process transparent. It lists components of the process and objectives in process development. It also touches on the role of leadership and the necessity for audit.

  11. Environmental Programs

    Office of Environmental Management (EM)

    Alamos National Laboratory | Environmental Programs Material Disposal Areas and the Threat of Wildfire Fact Sheet Established in 1943, Los Alamos National Laboratory now consists of 1,280 buildings in 47 technical areas spread out over 37 square miles. The complex includes 11 nuclear facilities and more than 10,000 workers. Los Alamos and Wildfires In the past, large wildfires in the area, including the La Mesa Fire (1977), the Dome Fire (1996), the Oso Fire (1998), the Cerro Grande Fire (2000)

  12. Guidance for performing preliminary assessments under CERCLA

    SciTech Connect (OSTI)

    1991-09-01

    EPA headquarters and a national site assessment workgroup produced this guidance for Regional, State, and contractor staff who manage or perform preliminary assessments (PAs). EPA has focused this guidance on the types of sites and site conditions most commonly encountered. The PA approach described in this guidance is generally applicable to a wide variety of sites. However, because of the variability among sites, the amount of information available, and the level of investigative effort required, it is not possible to provide guidance that is equally applicable to all sites. PA investigators should recognize this and be aware that variation from this guidance may be necessary for some sites, particularly for PAs performed at Federal facilities, PAs conducted under EPA`s Environmental Priorities Initiative (EPI), and PAs at sites that have previously been extensively investigated by EPA or others. The purpose of this guidance is to provide instructions for conducting a PA and reporting results. This guidance discusses the information required to evaluate a site and how to obtain it, how to score a site, and reporting requirements. This document also provides guidelines and instruction on PA evaluation, scoring, and the use of standard PA scoresheets. The overall goal of this guidance is to assist PA investigators in conducting high-quality assessments that result in correct site screening or further action recommendations on a nationally consistent basis.

  13. Residential Buildings Integration Program

    Broader source: Energy.gov [DOE]

    Residential Buildings Integration Program Presentation for the 2013 Building Technologies Office's Program Peer Review

  14. STEP Program Benchmark Report

    Broader source: Energy.gov [DOE]

    STEP Program Benchmark Report, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  15. Preliminary Notice of Violation, Safety and Ecology Corporation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ecology Corporation related to a 10 CFR Part 708 Violation at the Portsmouth Gaseous Diffusion Project On June 14, 2005, the U.S. Department of Energy issued a Preliminary Notice...

  16. Preliminary/Sample Residential EE Loan Term Sheet and Underwriting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Clean Energy Finance Guide, 3rd Edition) PreliminarySample Residential EE Loan Term Sheet and Underwriting Criteria (Appendix A of the Clean Energy Finance Guide, 3rd ...

  17. Preliminary Site Assessment Of The Redfield Campus, Reno, Nevada...

    Open Energy Info (EERE)

    Site Assessment Of The Redfield Campus, Reno, Nevada, Usa Jump to: navigation, search OpenEI Reference LibraryAdd to library Conference Paper: Preliminary Site Assessment Of The...

  18. Preliminary Notice of Violation, Savannah River Nuclear Solutions...

    Broader source: Energy.gov (indexed) [DOE]

    Preliminary Notice of Violation issued to Savannah River Nuclear Solutions, LLC related to a Nitric Acid Spill Event and an Electrical Arc Flash Injury Event at the Savannah River ...

  19. CRAD, Preliminary Documented Safety Analysis - July 25, 2014...

    Broader source: Energy.gov (indexed) [DOE]

    4 Preliminary Documented Safety Analysis (IEA CRAD 31-2, REV. 0) This Criteria Review and Approach Document (IEA CRAD 31-2, REV. 0) provides objectives, criteria, and approaches...

  20. Preliminary Notice of Violation, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Los Alamos National Laboratory - EA-2007-01 Preliminary Notice of Violation, Los Alamos National Laboratory - EA-2007-01 July 13, 2007 Issued to Los Alamos National Security, LLC ...

  1. Preliminary Notice of Violation, Los Alamos National Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - WEA-2012-03 Preliminary Notice of Violation, Los Alamos National Security, LLC - WEA-2012-03 October 17, 2012 Issued to Los Alamos National Security, LLC, related to Four ...

  2. Preliminary Notice of Violation, Los Alamos National Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    issued to Los Alamos National Security, LLC On May 27, 2015, the National Nuclear Security Administration issued a Preliminary Notice of Violation (WEA-2015-04) to Los Alamos ...

  3. Preliminary Notice of Violation, Nuclear Waste Partnership, LLC

    Office of Energy Efficiency and Renewable Energy (EERE)

    Worker Safety and Health and Nuclear Safety Enforcement Preliminary Notice of Violation issued to Nuclear Waste Partnership, LLC relating to an underground truck fire and a radiological release that occurred at the Waste Isolation Pilot Plant

  4. Preliminary Notice of Violation, SLAC National Accelerator Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Enforcement issued a Preliminary Notice of Violation (WEA-2009-01) to Stanford University for violations of 10 C.F.R. 851 associated with a polyvinyl chloride pipe ...

  5. Fact Sheet, Preliminary Notice of Violation: Four Hazardous Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Notice of Violation: Four Hazardous Energy Control Events at LANL On October ... in Los Alamos, New Mexico. The PNOV cites four violations of DOE worker safety and health ...

  6. Preliminary Notice of Violation, Bechtel National, Inc. - NEA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Preliminary Notice of Violation, Bechtel National, Inc. - NEA-2008-03 September 15, 2008 Issued to Bechtel National, Inc., related to 10. C.F.R. Part 708 at the Hanford Site On ...

  7. Preliminary Notice of Violation, Bechtel National PNOV - WEA...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bechtel National PNOV - WEA-2012-02 Preliminary Notice of Violation, Bechtel National PNOV - WEA-2012-02 May 31, 2012 Issued to Bechtel National, Incorporated, related to Two ...

  8. Preliminary Notice of Violation, Fluor Daniel Fernald Corporation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fernald Corporation - EA-97-05 Preliminary Notice of Violation, Fluor Daniel Fernald Corporation - EA-97-05 July 29, 1997 Issued to Fluor Daniel Fernald Corporation related to...

  9. Preliminary Notice of Violation, Pacific Northwest National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in responding to a high level alarm for a criticality safe slab tank in a laboratory vacuum system at the Pacific Northwest National Laboratory. PDF icon Preliminary Notice of...

  10. Spent nuclear fuel project path forward preliminary safety evaluation

    SciTech Connect (OSTI)

    Brehm, J.R.; Crowe, R.D.; Siemer, J.M.; Wojdac, L.F.; Hosler, A.G.

    1995-03-01

    This preliminary safety evaluation (PSE) provides validation of the initial project design criteria for the Spent Nuclear Fuel Project (SNFP) Path Forward for removal of fuel from K Basins.

  11. Preliminary Notice of Violation, Fluor Fernald, Inc - EA-2001...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inc - EA-2001-06 Preliminary Notice of Violation, Fluor Fernald, Inc - EA-2001-06 January 4, 2002 Issued to Fluor Fernald, Inc., related to Unplanned Radiation Exposures and ...

  12. Enhanced Accident Tolerant Fuels for LWRS - A Preliminary Systems Analysis

    Office of Scientific and Technical Information (OSTI)

    (Technical Report) | SciTech Connect Enhanced Accident Tolerant Fuels for LWRS - A Preliminary Systems Analysis Citation Details In-Document Search Title: Enhanced Accident Tolerant Fuels for LWRS - A Preliminary Systems Analysis The severe accident at Fukushima Daiichi nuclear plants illustrates the need for continuous improvements through developing and implementing technologies that contribute to safe, reliable and cost-effective operation of the nuclear fleet. Development of enhanced

  13. Fully Ceramic Microencapsulated (FCM) Fuel in FHRs: A Preliminary Reactor

    Office of Scientific and Technical Information (OSTI)

    Physics Assessment (Conference) | SciTech Connect Fully Ceramic Microencapsulated (FCM) Fuel in FHRs: A Preliminary Reactor Physics Assessment Citation Details In-Document Search Title: Fully Ceramic Microencapsulated (FCM) Fuel in FHRs: A Preliminary Reactor Physics Assessment Authors: Powers, Jeffrey J [1] + Show Author Affiliations ORNL Publication Date: 2014-01-01 OSTI Identifier: 1185562 DOE Contract Number: DE-AC05-00OR22725 Resource Type: Conference Resource Relation: Conference: 2014

  14. Gemini Planet Imager: Preliminary Design Report (Technical Report) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Technical Report: Gemini Planet Imager: Preliminary Design Report Citation Details In-Document Search Title: Gemini Planet Imager: Preliminary Design Report For the first time in history, direct and indirect detection techniques have enabled the exploration of the environments of nearby stars on scales comparable to the size of our solar system. Precision Doppler measurements have led to the discovery of the first extrasolar planets, while high-contrast imaging has revealed

  15. Federal ESPC Process Phase 2: ESCO Selection and Preliminary Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 2: ESCO Selection and Preliminary Assessment Federal ESPC Process Phase 2: ESCO Selection and Preliminary Assessment During phase 2 of the energy savings performance contract (ESPC) process, the agency selects an energy service company (ESCO) to proceed with project development. The selection process includes notifying all indefinite-delivery, indefinite-quantity (IDIQ) ESCOs of the opportunity, reviewing ESCO responses, and down-selecting to two or more ESCOs, then

  16. NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report The following information represents a partial sequence of events based upon Reliability Coordinator information available to NERC. It is not clear if these events caused the event or were a consequence of other events. NERC is establishing teams to study the event and will coordinate with FERC, DOE, the industry and

  17. National Network for Manufacturing Innovation: A Preliminary Design |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy National Network for Manufacturing Innovation: A Preliminary Design National Network for Manufacturing Innovation: A Preliminary Design The Federal investment in the National Network for Manufacturing Innovation (NNMI) serves to create an effective manufacturing research infrastructure for U.S. industry and academia to solve industry-relevant problems. The NNMI will consist of linked Institutes for Manufacturing Innovation (IMIs) with common goals, but unique

  18. 2014 Energy Storage Peer Review - Preliminary Agenda | Department of Energy

    Energy Savers [EERE]

    Energy Storage Peer Review - Preliminary Agenda 2014 Energy Storage Peer Review - Preliminary Agenda The 2014 Energy Storage Peer Review will be held September 19-19, 2014, in Washington, DC. The event is free but registration is required by Friday, September 5, 2014. This year's review will include the latest innovations across all spectrums of energy storage, spanning materials research all the way to the safe deployment of systems. OE's Dr. Imre Gyuk will be an opening speaker, providing the

  19. DOE Preliminary Plan for Retrospective Analysis of Existing Rules |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Preliminary Plan for Retrospective Analysis of Existing Rules DOE Preliminary Plan for Retrospective Analysis of Existing Rules On January 18, 2011, the President issued Executive Order 13563, "Improving Regulation and Regulatory Review," to ensure that Federal regulations seek more affordable, less intrusive means to achieve policy goals, and that agencies give careful consideration to the benefits and costs of those regulations. Executive Order 13563

  20. Annual Energy Outlook 2016 Renewables Working Group Preliminary Results

    U.S. Energy Information Administration (EIA) Indexed Site

    Renewables Working Group Preliminary Results Renewables AEO2016 Working Group February 9, 2016| Washington, DC By EIA, Renewable Electricity Analysis Team WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Overview 2 Renewable Electricity Analysis Team February 9, 2016 * Key policy provisions * Update on CPP model representation * Update on status of Leidos capital cost study * Preliminary results WORKING GROUP PRESENTATION FOR DISCUSSION

  1. Annual Energy Outlook 2016: Electricity Sector Preliminary Results

    U.S. Energy Information Administration (EIA) Indexed Site

    Electricity Sector Preliminary Results For Electricity AEO2016 Working Group February 10, 2016| Washington, DC By EIA, Office of Electricity, Coal, Nuclear & Renewables Analysis WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Summary 2 Electricity Analysis Team February 10, 2016 * Address issues raised by stakeholders * Discuss recent developments- updates to generator status and capital costs * Present preliminary AEO2016 forecast

  2. Preliminary Multiphysics Analyses of HFIR LEU Fuel Conversion using COMSOL

    Office of Scientific and Technical Information (OSTI)

    (Technical Report) | SciTech Connect Technical Report: Preliminary Multiphysics Analyses of HFIR LEU Fuel Conversion using COMSOL Citation Details In-Document Search Title: Preliminary Multiphysics Analyses of HFIR LEU Fuel Conversion using COMSOL The research documented herein was performed by several individuals across multiple organizations. We have previously acknowledged our funding for the project, but another common thread among the authors of this document, and hence the research

  3. Preliminary Results of Investigating Precompound Emission of Light

    Office of Scientific and Technical Information (OSTI)

    Fragments in Spallation Reactions, Summer 2012 (Technical Report) | SciTech Connect Preliminary Results of Investigating Precompound Emission of Light Fragments in Spallation Reactions, Summer 2012 Citation Details In-Document Search Title: Preliminary Results of Investigating Precompound Emission of Light Fragments in Spallation Reactions, Summer 2012 Authors: Kerby, Leslie M. [1] ; Mashnik, Stepan G. [1] ; Sierk, Arnold John [1] + Show Author Affiliations Los Alamos National Laboratory

  4. Preliminary Study on Emittance Growth in the LHEC Recirculating Linac

    Office of Scientific and Technical Information (OSTI)

    (Conference) | SciTech Connect Preliminary Study on Emittance Growth in the LHEC Recirculating Linac Citation Details In-Document Search Title: Preliminary Study on Emittance Growth in the LHEC Recirculating Linac In this paper, we estimate the emittance growth in the LHeC recirculating Linac, the lattice design of which is presented in another paper of IPAC10 proceedings. The possible sources for emittance growth included here are: energy spread from RF acceleration in the SRF

  5. Preliminary characterization of active MEMS valves. (Technical Report) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Preliminary characterization of active MEMS valves. Citation Details In-Document Search Title: Preliminary characterization of active MEMS valves. Partial characterization of a series of electrostatically actuated active microfluidic valves is to be performed. Tests are performed on a series of 24 valves from two different MEMS sets. Focus is on the physical deformation of the structures under variable pressure loadings, as well as voltage levels. Other issues that inhibit

  6. Preliminary neutronics assessment of fully ceramic microencapsulated fuel

    Office of Scientific and Technical Information (OSTI)

    in high-temperature gas-cooled reactors (Conference) | SciTech Connect Conference: Preliminary neutronics assessment of fully ceramic microencapsulated fuel in high-temperature gas-cooled reactors Citation Details In-Document Search Title: Preliminary neutronics assessment of fully ceramic microencapsulated fuel in high-temperature gas-cooled reactors Authors: Powers, Jeffrey J [1] + Show Author Affiliations ORNL Publication Date: 2016-01-01 OSTI Identifier: 1252151 DOE Contract Number:

  7. Preliminary Evaluation of Removing Used Nuclear Fuel From Shutdown Sites |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Preliminary Evaluation of Removing Used Nuclear Fuel From Shutdown Sites Preliminary Evaluation of Removing Used Nuclear Fuel From Shutdown Sites In January 2013, the Department of Energy issued the Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste. Among the elements contained in this strategy is an initial focus on accepting used nuclear fuel from shutdown reactor sites. This focus is consistent with the recommendations of

  8. Preliminary Notice of Violation, Brookhaven Science Associates, LLC -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WEA-2013-01 | Department of Energy Brookhaven Science Associates, LLC - WEA-2013-01 Preliminary Notice of Violation, Brookhaven Science Associates, LLC - WEA-2013-01 August 29, 2013 Issued to Brookhaven Science Associates, LLC, related to a Fall Injury Event that occurred in Building 701 at the Brookhaven National Laboratory On August 29, 2013, the U.S. Department of Energy (DOE) Office of Health, Safety and Security's Office of Enforcement and Oversight issued a Preliminary Notice of

  9. Preliminary Notice of Violation, Los Alamos National Security, LLC |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy February 18, 2016 Nuclear Safety Enforcement Preliminary Notice of Violation issued to Los Alamos National Security, LLC relating to the packaging and remediation of transuranic waste drums at the Los Alamos National Laboratory On February 18, 2016, the National Nuclear Security Administration issued a Preliminary Notice of Violation (NEA-2016-01) to Los Alamos National Security, LLC for violations of 10 C.F.R. Part 830 associated with the packaging and remediation of

  10. ESPC ENABLE PRELIMINARY LETTER TO UNSUCCESSFUL ESCO OFFERORS GUIDE AND

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    TEMPLATE | Department of Energy PRELIMINARY LETTER TO UNSUCCESSFUL ESCO OFFERORS GUIDE AND TEMPLATE ESPC ENABLE PRELIMINARY LETTER TO UNSUCCESSFUL ESCO OFFERORS GUIDE AND TEMPLATE Document describes the acquisition team's selection of an energy service company (ESCO). It should be used to notify unsuccessful offerors that they were not selected. This letter briefly describes the criteria that prevented each particular ESCO from being selected and provide the opportunity to request a debrief.

  11. Preliminary Notice of Violation, NEA-2011-02

    Office of Environmental Management (EM)

    EA-2007-01 | Department of Energy Los Alamos National Laboratory - EA-2007-01 Preliminary Notice of Violation, Los Alamos National Laboratory - EA-2007-01 July 13, 2007 Issued to Los Alamos National Security, LLC related to the Unauthorized Reproduction and Removal of Classified Matter from the Los Alamos National Laboratory On July 13, 2007, the National Nuclear Security Administration issued a Preliminary Notice of Violation (EA-2007-01) to Los Alamos National Security, LLC in accordance

  12. Intergovernmental Programs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Intergovernmental Programs Intergovernmental Programs Intergovernmental Programs Intergovernmental Programs Intergovernmental Programs Intergovernmental Programs Intergovernmental Programs Intergovernmental Programs Intergovernmental Programs Intergovernmental Programs Intergovernmental Programs Intergovernmental Programs Intergovernmental Programs Intergovernmental Programs The Office of Environmental Management supports, by means of grants and cooperative agreements, a number of

  13. Program Update

    Energy Savers [EERE]

    5 issue of the U.S. Department of Energy (DOE) Offce of Legacy Management (LM) Program Update. This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to lm@hq.doe.gov. January-March 2015 Visit us at http://energy.gov/lm/ Goal 4 Successful Transition from Mound Site to Mound Business Park Continues The Mound Business Park attracts a variety of businesses to the former U.S. Department of Energy (DOE) Mound, Ohio, Site in Miamisburg. In

  14. Programming Models

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Version Control Tools Programming Libraries Performance and Debugging Tools Grid Software and Services NERSC Software Downloads Policies User Surveys NERSC Users Group User Announcements Help Staff Blogs Request Repository Mailing List Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612 Consulting http://help.nersc.gov consult@nersc.gov 1-800-66-NERSC, option 3

  15. Preliminary Analysis of Remote Monitoring & Robotic Concepts for Performance Confirmation

    SciTech Connect (OSTI)

    D.A. McAffee

    1997-02-18

    As defined in 10 CFR Part 60.2, Performance Confirmation is the ''program of tests, experiments and analyses which is conducted to evaluate the accuracy and adequacy of the information used to determine with reasonable assurance that the performance objectives for the period after permanent closure will be met''. The overall Performance Confirmation program begins during site characterization and continues up to repository closure. The main purpose of this document is to develop, explore and analyze initial concepts for using remotely operated and robotic systems in gathering repository performance information during Performance Confirmation. This analysis focuses primarily on possible Performance Confirmation related applications within the emplacement drifts after waste packages have been emplaced (post-emplacement) and before permanent closure of the repository (preclosure). This will be a period of time lasting approximately 100 years and basically coincides with the Caretaker phase of the project. This analysis also examines, to a lesser extent, some applications related to Caretaker operations. A previous report examined remote handling and robotic technologies that could be employed during the waste package emplacement phase of the project (Reference 5.1). This analysis is being prepared to provide an early investigation of possible design concepts and technical challenges associated with developing remote systems for monitoring and inspecting activities during Performance Confirmation. The writing of this analysis preceded formal development of Performance Confirmation functional requirements and program plans and therefore examines, in part, the fundamental Performance Confirmation monitoring needs and operating conditions. The scope and primary objectives of this analysis are to: (1) Describe the operating environment and conditions expected in the emplacement drifts during the preclosure period. (Presented in Section 7.2). (2) Identify and discuss the main Performance Confirmation monitoring needs and requirements during the post-emplacement preclosure period. This includes radiological, non-radiological, host rock, and infrastructure performance monitoring needs. It also includes monitoring for possible off-normal events. (Presented in Section 7.3). (3) Identify general approaches and methods for obtaining performance information from within the emplacement drifts for Performance Confirmation. (Presented in Section 7.4) (4)Review and discuss available technologies and design strategies that may permit the use of remotely operated systems within the hostile thermal and radiation environment expected within the emplacement drifts. (Presented in Section 7.5). (5) Based on Performance Confirmation monitoring needs and available technologies, identify potential application areas for remote systems and robotics for post-emplacement preclosure Performance Confirmation activities (Presented in Section 7.6). (6) Develop preliminary remote monitoring and robotic concepts for post-emplacement, preclosure Performance Confirmation activities. (Presented in Section 7.7) This analysis is being performed very early in the systems engineering cycle, even as issues related to the Performance Confirmation program planning phase are being formulated and while the associated needs, constraints and objectives are yet to be fully determined and defined. This analysis is part of an issue formulation effort and is primarily concerned with identification and description of key issues related to remotely monitoring repository performance for Performance Confirmation. One of the purposes of this analysis is to provide an early investigation of potential design challenges that may have a high impact on future design concepts. This analysis can be used to guide future concept development and help access what is feasible and achievable by application of remote systems technology. Future design and systems engineering analysis with applicable iterations of modeling, optimizing, ranking and refinement of concepts will be needed to arrive at optimal design concepts.

  16. Preliminary Evaluation of the Trench 1 Collection Drain Floodplain Area of the Shiprock, New Mexico, Site

    Broader source: Energy.gov [DOE]

    Preliminary Evaluation of the Trench 1 Collection Drain Floodplain Area of the Shiprock, New Mexico, Site

  17. Preliminary Notice of Violation, Lawrence Livermore National Security, LLC- September 25, 2014

    Broader source: Energy.gov [DOE]

    Worker Safety and Health Enforcement Preliminary Notice of Violation issued to Lawrence Livermore National Security, LLC

  18. Preliminary Notice of Violation, Babcock and Wilcox Technical Services Y-12, LLC

    Broader source: Energy.gov [DOE]

    Security Enforcement Preliminary Notice of Violation issued to Babcock and Wilcox Technical Services Y-12, LLC

  19. PRELIMINARY SURVEY OF TEXAS CITY CHEMICALS, INC.

    Office of Legacy Management (LM)

    TEXAS CITY CHEMICALS, INC. (BORDEN ct1Er4IcAL DIVISION 0~ BORDEN, INC.) TEXAS CITY, TEXAS Work performed by the Health and Safety Research Division Oak Ridge National Laboratory Oak Ridge, Tennessee 37830 March 1980 OAK RIDGE NATIONAL LABORATORY operated by UNION CARBIDE CORPORATION for the DEPARTMENT OF ENERGY as part of the Formerly Utilized Sites-- Remedial Action Program TEXAS CITY CHEMICALS, INC. (BORDEN CHEMICAL DIVISION 0~ BORDEN, INC. > TEXAS CITY, TEXAS At the request of the

  20. Preliminary Inputs for Wisconsin RPS Analysis

    U.S. Energy Information Administration (EIA) Indexed Site

    Cashing in on Clean Energy: A National Renewable Electricity Standard will Benefit the Environment and the Economy Renewable Energy & Economic Development Session EIA 30 th Anniversary conference Washington DC April 7, 2008 Alan Nogee Director, Clean Energy Program Union of Concerned Scientists www.ucsusa.org Renewable electricity standards: a primary driver of new renewables Ø The #1 driver of renewable energy development. Goldman Sachs Ø"... the most important driver for new

  1. Partitioning planning studies: Preliminary evaluation of metal and radionuclide partitioning the high-temperature thermal treatment systems

    SciTech Connect (OSTI)

    Liekhus, K.; Grandy, J.; Chambers, A.

    1997-03-01

    A preliminary study of toxic metals and radionuclide partitioning during high-temperature processing of mixed waste has been conducted during Fiscal Year 1996 within the Environmental Management Technology Evaluation Project. The study included: (a) identification of relevant partitioning mechanisms that cause feed material to be distributed between the solid, molten, and gas phases within a thermal treatment system; (b) evaluations of existing test data from applicable demonstration test programs as a means to identify and understand elemental and species partitioning; and, (c) evaluation of theoretical or empirical partitioning models for use in predicting elemental or species partitioning in a thermal treatment system. This preliminary study was conducted to identify the need for and the viability of developing the tools capable of describing and predicting toxic metals and radionuclide partitioning in the most applicable mixed waste thermal treatment processes. This document presents the results and recommendations resulting from this study that may serve as an impetus for developing and implementing these predictive tools.

  2. Geothermal Technologies Program Overview - Peer Review Program

    SciTech Connect (OSTI)

    Milliken, JoAnn

    2011-06-06

    This Geothermal Technologies Program presentation was delivered on June 6, 2011 at a Program Peer Review meeting. It contains annual budget, Recovery Act, funding opportunities, upcoming program activities, and more.

  3. Socioeconomic Assessment and Research Program

    SciTech Connect (OSTI)

    Poyer, David A.

    2013-03-16

    Preliminary review and analyses of residential energy consumption surveys' (various) comparing levels of energy expenditures across population categories.

  4. Undergraduate Student Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Undergraduate Program Undergraduate Student Program The Undergraduate Student (UGS) program is a year-round educational program that provides students with relevant research experience while they are pursuing an undergraduate degree. Contact Program Manager Scott Robbins Student Programs (505) 667-3639 Email Program Coordinator Emily Robinson Student Programs (505) 665-0964 Email Deadline for continuing and returning students: you are required to submit updated transcripts to the program office

  5. Machinist Pipeline/Apprentice Program Program Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    cost effective than previous time-based programs Moves apprentices to journeyworker status more quickly Program Coordinator: Heidi Hahn Email: hahn@lanl.gov Phone number:...

  6. Existing Facilities Rebate Program

    Broader source: Energy.gov [DOE]

    The NYSERDA Existing Facilities program merges the former Peak Load Reduction and Enhanced Commercial and Industrial Performance programs. The new program offers a broad array of different...

  7. Graduate Research Assistant Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in intellectual vitality and opportunities for growth. Contact Program Manager Scott Robbins Student Programs (505) 667-3639 Email Program Coordinator Emily Robinson Student...

  8. Commercial Buildings Integration Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Buildings Integration Program Arah Schuur Program Manager arah.schuur@ee.doe.gov April 2, ... Commercial Buildings Integration Program Mission Accelerate voluntary uptake of ...

  9. DOE's Tribal Energy Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Tribal Energy Program Program Funding History Tribal Energy Program Funding* FY2009 ... FY2011 Financial Assistance First Steps Toward Developing Energy Efficiency and ...

  10. Building Technologies Program Presentation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable Energy Building Technologies Program Jerry Dion Acting Program Manager Building Technologies Program State Energy Advisory Board Meeting October 17, 2007 The investment ...

  11. Integrated Global Nuclear Materials Management Preliminary Concepts

    SciTech Connect (OSTI)

    Jones, E; Dreicer, M

    2006-06-19

    The world is at a turning point, moving away from the Cold War nuclear legacy towards a future global nuclear enterprise; and this presents a transformational challenge for nuclear materials management. Achieving safety and security during this transition is complicated by the diversified spectrum of threat 'players' that has greatly impacted nonproliferation, counterterrorism, and homeland security requirements. Rogue states and non-state actors no longer need self-contained national nuclear expertise, materials, and equipment due to availability from various sources in the nuclear market, thereby reducing the time, effort and cost for acquiring a nuclear weapon (i.e., manifestations of latency). The terrorist threat has changed the nature of military and national security requirements to protect these materials. An Integrated Global Nuclear Materials Management (IGNMM) approach would address the existing legacy nuclear materials and the evolution towards a nuclear energy future, while strengthening a regime to prevent nuclear weapon proliferation. In this paper, some preliminary concepts and studies of IGNMM will be presented. A systematic analysis of nuclear materials, activities, and controls can lead to a tractable, integrated global nuclear materials management architecture that can help remediate the past and manage the future. A systems approach is best suited to achieve multi-dimensional and interdependent solutions, including comprehensive, end-to-end capabilities; coordinated diverse elements for enhanced functionality with economy; and translation of goals/objectives or standards into locally optimized solutions. A risk-informed basis is excellent for evaluating system alternatives and performances, and it is especially appropriate for the security arena. Risk management strategies--such as defense-in-depth, diversity, and control quality--help to weave together various technologies and practices into a strong and robust security fabric. Effective policy, science/technology, and intelligence elements are all crucial and must be harmonized. It is envisioned that integrated solutions will include reducing and securing nuclear/radiological materials at their source; improved monitoring and tracking; and enhancing detection, interdiction, and response. An active architecture, artfully combined of many synergistic elements, would support national actions and international collaboration in nuclear materials management, and it would help navigate a transition toward global nuclear sustainability.

  12. International DSM and DSM program evaluation: An INDEEP assessment

    SciTech Connect (OSTI)

    Vine, E.

    1995-04-01

    This paper discusses the current level of demand-side management (DSM) occurring in selected European countries and reviews the availability of information on DSM programs and program evaluation. Next, thirteen European DSM programs are compared by examining such factors as: motivations for program implementation, marketing methods, participation rates, total energy savings, and program costs. The transfer of DSM program results and experiences found in these case studies is also discussed, as well as the lessons learned during the design, implementation, and evaluation of these programs. This paper represents a preliminary assessment of the state of DSM and DSM program evaluation in Europe. The findings from this work also represent the first steps in a joint international effort to compile and analyze the measured results of energy efficiency programs in a consistent and comprehensive fashion. The authors find that these programs represent cost-effective resources: the cost of energy saved by the programs ranged from a low of 0.0005 ECUs/kWh (0.01 {cents}/kWh) to a high of 0.077 ECUs/kWh (9.7 {cents}/kWh), with an average cost of 0.027 ECUs/kWh (3.3 {cents}/kWh). Weighted by energy savings, the average cost of energy saved by the programs was 0.014 ECUs/kWh (1.8 {cents}/kWh).

  13. Better Buildings Neighborhood Program Business Models Guide: Program Administrator Description

    Broader source: Energy.gov [DOE]

    Better Buildings Neighborhood Program Business Models Guide: Program Administrator Business Models, Program Administrator Description.

  14. Utility applications program. Annual report for 1981

    SciTech Connect (OSTI)

    Doherty, T.J.; Loscutoff, W.V.

    1982-06-01

    The purpose of the Utility Applications Program is to provide information and assistance to interested utilities on central station energy storage systems. Compressed air and underground pumped hydroelectric energy storage are the primary technical focus. Smaller utilities are the primary targets of this program, as they may not have resources to track and utilize new energy conservation developments. The program, initiated during this year-long period, consists of a series of tasks integrating and supporting energy storage implementation. Program management and technical coordination activities monitor the wide range of research ongoing both under government support and in industry and provide a locus for dissemination of results. Recently completed DOE demonstration studies provide the central data base and the DOE CAES and UPH Technology Program activities provide another major resource. In addition a UPH preliminary feasibility study in coorination with Central Vermont Public Servie (CVPS), a Northeast utility, was carried out. The major program activity this period was a comprehensive technology assessment and environmental siting study, performed in coordination with the Soyland Power Cooperative in Decatur, Illinois. The reports from this work established solid siting precedents for CAES application in the US and jointly assisted the utility in assembling the required baseline information for ongoing technical and financial development of the first US compressed air energy storage facility.

  15. Preliminary waste acceptance criteria for the ICPP spent fuel and waste management technology development program

    SciTech Connect (OSTI)

    Taylor, L.L.; Shikashio, R.

    1993-09-01

    The purpose of this document is to identify requirements to be met by the Producer/Shipper of Spent Nuclear Fuel/High-LeveL Waste SNF/HLW in order for DOE to be able to accept the packaged materials. This includes defining both standard and nonstandard waste forms.

  16. Final Report Appendices. Preliminary Process and Market Evaluation. Better Buildings Neighborhood Program

    SciTech Connect (OSTI)

    Peters, Jane S.

    2012-12-28

    This document was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, usefulness, or any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, re commendation, or favoring by the United States government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States government or any agency thereof.

  17. Characteristics, finite element analysis, test description, and preliminary test results of the STM4-120 kinematic Stirling engine

    SciTech Connect (OSTI)

    Linker, K.L.; Rawlinson, K.S.; Smith, G.

    1991-10-01

    The Department of Energy's Solar Thermal Program has as one of its program elements the development and evaluation of conversion device technologies applicable to dish-electric systems. The primary research and development combines a conversion device (heat engine), solar receiver, and generator mounted at the focus of a parabolic dish concentrator. The Stirling-cycle heat engine was identified as the conversion device for dish-electric with the most potential for meeting the program's goals for efficiency, reliability, and installed cost. To advance the technology toward commercialization, Sandia National Laboratories has acquired a Stirling Thermal Motors, Inc., kinematic Stirling engine, STM4-120, for evaluation. The engine is being bench-tested at Sandia's Engine Test Facility and will be combined later with a solar receiver for on-sun evaluation. This report presents the engine characteristics, finite element analyses of critical engine components, test system layout, instrumentation, and preliminary performance results from the bench test.

  18. Human Reliability Program Overview

    SciTech Connect (OSTI)

    Bodin, Michael

    2012-09-25

    This presentation covers the high points of the Human Reliability Program, including certification/decertification, critical positions, due process, organizational structure, program components, personnel security, an overview of the US DOE reliability program, retirees and academia, and security program integration.

  19. Vehicle Technologies Program Overview

    SciTech Connect (OSTI)

    none,

    2006-09-05

    Overview of the Vehicle Technologies Program including external assessment and market view; internal assessment, program history and progress; program justification and federal role; program vision, mission, approach, strategic goals, outputs, and outcomes; and performance goals.

  20. Utility Partnerships Program Overview

    SciTech Connect (OSTI)

    2014-10-03

    Document describes the Utility Partnerships Program within the U.S. Department of Energy's Federal Energy Management Program.

  1. STEM Education Program Inventory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Issue for STEM Education Program Inventory Title of Program* Requestor Contact Information First Name* Last Name* Phone Number* E-mail* Fax Number Institution Name Program Description* Issue Information Leading Organization* Location of Program / Event Program Address Program Website To select multiple options, press CTRL and click. Type of Program (if Other, enter information in the box to the right.)* Workforce Development Student Programs Public Engagement in Life Long Learning

  2. Wisconsin Clean Transportation Program

    Broader source: Energy.gov [DOE]

    2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation

  3. Wisconsin Clean Transportation Program

    Broader source: Energy.gov [DOE]

    2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  4. Residential Buildings Integration Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2, 2013 Residential Buildings Integration Program Building Technologies Office ... Overview of the Residential Integration Program Research Implementation tools ...

  5. HQ Mediation Program Brochure

    Broader source: Energy.gov [DOE]

    This document is the HQ Mediation Program's brochure.  It generally discusses the services the program offers.

  6. Mentoring Program | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mentoring Program Mentoring Program Mentee Questionnaire Mentor Questionnaire Ideas for Mentoring Program Activities...

  7. Machinist Pipeline/Apprentice Program Program Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Machinist Pipeline/Apprentice Program Program Description The Machinist Pipeline Program was created by the Prototype Fabrication Division to fill a critical need for skilled journeyworker machinists. It is based on a program developed by the National Institute for Metalworking Skills (NIMS) in conjunction with metalworking trade associations to develop and maintain a globally competitive U.S. workforce. The goal is to develop and implement apprenticeship programs that are aligned with

  8. Verification of EPA's ''Preliminary Remediation Goals for radionuclides'' (PRG) electronic calculator

    SciTech Connect (OSTI)

    Jannik, Tim; Stagich, Brooke

    2015-08-28

    The U.S. Environmental Protection Agency (EPA) requested an external, independent verification study of their updated “Preliminary Remediation Goals for Radionuclides” (PRG) electronic calculator. The calculator provides PRGs for radionuclides that are used as a screening tool at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) sites. These risk-based PRGs establish concentration limits under specific exposure scenarios. The purpose of this verification study is to determine that the calculator has no inherit numerical problems with obtaining solutions as well as to ensure that the equations are programmed correctly. There are 167 equations used in the calculator. To verify the calculator, all equations for each of seven receptor types (resident, construction worker, outdoor and indoor worker, recreator, farmer, and composite worker) were hand calculated using the default parameters. The same four radionuclides (Am-241, Co-60, H-3, and Pu-238) were used for each calculation for consistency throughout.

  9. Value impact assessment: A preliminary assessment of improvement opportunities at the Quantico Central Heating Plant

    SciTech Connect (OSTI)

    Brambley, M.R.; Weakley, S.A.

    1990-09-01

    This report presents the results of a preliminary assessment of opportunities for improvement at the US Marine Corps (USMC) Quantico, Virginia, Central Heating Plant (CHP). This study is part of a program intended to provide the CHP staff with a computerized Artificial Intelligence (AI) decision support system that will assist in a more efficient, reliable, and safe operation of their plant. As part of the effort to provide the AI decision support system, a team of six scientists and engineers from the Pacific Northwest Laboratory (PNL) visited the plant to characterize the conditions and environment of the CHP. This assessment resulted in a list of potential performance improvement opportunities at the CHP. In this report, 12 of these opportunities are discussed and qualitatively analyzed. 70 refs., 7 figs., 6 tabs.

  10. Preliminary Safety Information Document for the Standard MHTGR. Volume 1, (includes latest Amendments)

    SciTech Connect (OSTI)

    1986-12-01

    With NRC concurrence, the Licensing Plan for the Standard HTGR describes an application program consistent with 10CFR50, Appendix O to support a US Nuclear Regulatory Commission (NRC) review and design certification of an advanced Standard modular High Temperature Gas-Cooled Reactor (MHTGR) design. Consistent with the NRC's Advanced Reactor Policy, the Plan also outlines a series of preapplication activities which have as an objective the early issuance of an NRC Licensability Statement on the Standard MHTGR conceptual design. This Preliminary Safety Information Document (PSID) has been prepared as one of the submittals to the NRC by the US Department of Energy in support of preapplication activities on the Standard MHTGR. Other submittals to be provided include a Probabilistic Risk Assessment, a Regulatory Technology Development Plan, and an Emergency Planning Bases Report.

  11. National Acid Precipitation Assessment Program Report to Congress: An Integrated Assessment

    SciTech Connect (OSTI)

    Uhart, M.; et al,

    2005-08-01

    Under Title IX of the 1990 Clean Air Act Amendments, Congress reauthorized the National Acid Precipitation Assessment Program (NAPAP) to continue coordinating acid rain research and monitoring, as it had done during the previous decade, and to provide Congress with periodic reports. In particular, Congress asked NAPAP to assess all available data and information to answer two questions: (1) What are the costs, benefits, and effectiveness of Title IV? This question addresses the costs and economic impacts of complying with the Acid Rain Program as well as benefit analyses associated with the various human health and welfare effects, including reduced visibility, damages to materials and cultural resources, and effects on ecosystems. (2) What reductions in deposition rates are needed to prevent adverse ecological effects? This complex questions addresses ecological systems and the deposition levels at which they experience harmful effects. The results of the assessment of the effects of Title IV and of the relationship between acid deposition rates and ecological effects were to be reported to Congress quadrennially, beginning with the 1996 report to Congress. The objective of this Report is to address the two main questions posed by Congress and fully communicate the results of the assessment to decision-makers. Given the primary audience, most of this report is not written as a technical document, although information supporting the conclusions is provided along with references.

  12. Preliminary Plan for Retrospective Analysis of Existing Rules

    Energy Savers [EERE]

    Department of Energy URS-Washington Division - WEA-2011-01 Preliminary Notice of Violation, URS-Washington Division - WEA-2011-01 October 3, 2011 Issued to URS-Washington Division related to a Hoisting Incident that occurred at the Sodium Bearing Waste Treatment Project at the Idaho National Laboratory On October 3, 2011, the U.S. Department of Energy (DOE) Office of Health, Safety and Security's Office of Enforcement and Oversight issued a Preliminary Notice of Violation (WEA-2011-01) to

  13. Preliminary Notice of Violation, Savannah River Nuclear Solutions, LLC -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WEA-2012-04 | Department of Energy Savannah River Nuclear Solutions, LLC - WEA-2012-04 Preliminary Notice of Violation, Savannah River Nuclear Solutions, LLC - WEA-2012-04 November 9, 2012 Issued to Savannah River Nuclear Solutions (SRNS), LLC, related to a Worker Fall from a Scaffold in the K-Area Complex at the Savannah River Site On November 9, 2012, the U.S. Department of Energy (DOE) Office of Health, Safety and Security's Office of Enforcement and Oversight issued a Preliminary Notice

  14. Preliminary Notice of Violation, LATA Environmental Services of Kentucky,

    Office of Environmental Management (EM)

    Department of Energy EA-2007-05 Preliminary Notice of Violation, Bechtel National, Inc. - EA-2007-05 October 4, 2007 Issued to Bechtel National, Inc., related to Design and Procurement Deficiencies at the Waste Treatment and Immobilization Plant at the Hanford Site On October 4, 2007, the U.S. Department of Energy (DOE) issued a Preliminary Notice of Violation (EA-2007-05) to Bechtel National, Inc. for violations of 10 C.F.R. 830 associated with design and procurement deficiencies at the

  15. Preliminary flowsheet: Ion exchange for separation of cesium from Hanford tank waste using resorcinol-formaldehyde resin

    SciTech Connect (OSTI)

    Penwell, D.L.

    1994-12-28

    This preliminary flowsheet document describes an ion exchange process which uses resorcinol-formaldehyde (R-F) resin to remove cesium from Hanford tank waste. The flowsheet describes one possible equipment configuration, and contains mass balances based on that configuration with feeds of Neutralized Current Acid Waste, and Double Shell Slurry Feed. The flowsheet also discusses process alternatives, unresolved issues, and development needs associated with the ion exchange process. It is expected that this flowsheet will evolve as open issues are resolved and progress is made on development needs. This is part of the Tank Waste Remediation Program at Hanford. 26 refs, 6 figs, 25 tabs.

  16. A multilingual programming model for coupled systems.

    SciTech Connect (OSTI)

    Ong, E. T.; Larson, J. W.; Norris, B.; Tobis, M.; Steder, M.; Jacob, R. L.; Mathematics and Computer Science; Univ. of Wisconsin; Univ. of Chicago; The Australian National Univ.

    2008-01-01

    Multiphysics and multiscale simulation systems share a common software requirement-infrastructure to implement data exchanges between their constituent parts-often called the coupling problem. On distributed-memory parallel platforms, the coupling problem is complicated by the need to describe, transfer, and transform distributed data, known as the parallel coupling problem. Parallel coupling is emerging as a new grand challenge in computational science as scientists attempt to build multiscale and multiphysics systems on parallel platforms. An additional coupling problem in these systems is language interoperability between their constituent codes. We have created a multilingual parallel coupling programming model based on a successful open-source parallel coupling library, the Model Coupling Toolkit (MCT). This programming model's capabilities reach beyond MCT's native Fortran implementation to include bindings for the C++ and Python programming languages. We describe the method used to generate the interlanguage bindings. This approach enables an object-based programming model for implementing parallel couplings in non-Fortran coupled systems and in systems with language heterogeneity. We describe the C++ and Python versions of the MCT programming model and provide short examples. We report preliminary performance results for the MCT interpolation benchmark. We describe a major Python application that uses the MCT Python bindings, a Python implementation of the control and coupling infrastructure for the community climate system model. We conclude with a discussion of the significance of this work to productivity computing in multidisciplinary computational science.

  17. High School Internship Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    High School Internship Program High School Internship Program Point your career towards Los Alamos Lab: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Contact Program Manager Scott Robbins Student Programs (505) 667-3639 Email Program Coordinator Brenda Montoya Student Programs (505) 667-4866 Email Opportunities for Northern New Mexico high school seniors The High School Internship Program provides qualified

  18. CASL-U-2015-0234-000 CASL Program Highlights

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    rod management for normal operating conditions. H concentration Contributors: Rose Montgomery (TVA), Ben Collins (ORNL) Independent review by Dudley Raine (B&W) CASL...

  19. Gd uptake experiments for preliminary set of functionalized adsorbents

    SciTech Connect (OSTI)

    Clinton Noack

    2015-03-16

    These data summarize adsorption experiments conducted with Gd in 0.5 M NaCl. Results represent preliminary, proof-of-concept data utilizing fine-powder silica gel as the adsorbent support. Future testing will focus on larger, application-appropriate beads.

  20. Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Preliminary Evaluation Results

    SciTech Connect (OSTI)

    Chandler, K.; Eudy, L.

    2008-10-01

    This report provides preliminary results from a National Renewable Energy Laboratory evaluation of a protoptye fuel cell transit bus operating at Connecticut Transit in Hartford. Included are descriptions of the planned fuel cell bus demonstration and equipment; early results and agency experience are also provided.

  1. Gd uptake experiments for preliminary set of functionalized adsorbents

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Clinton Noack

    These data summarize adsorption experiments conducted with Gd in 0.5 M NaCl. Results represent preliminary, proof-of-concept data utilizing fine-powder silica gel as the adsorbent support. Future testing will focus on larger, application-appropriate beads.

  2. CONTENTS Preliminary Results of China's Third Gas Hydrate Drilling

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Preliminary Results of China's Third Gas Hydrate Drilling Expedition: A Critical Step From Discovery to Development in the South China Sea ............................1 Gas Hydrate Occurrences in the Black Sea - New Observations from the German SUGAR Project ...............................................6 Methane Hydrate Dynamics on the Northern US Atlantic Margin ............................................ 10 Gas Hydrate, Carbonate Crusts, and Chemosynthetic Organisms on A Vestnesa Ridge

  3. Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Preliminary Evaluation Results

    Broader source: Energy.gov [DOE]

    This report provides preliminary results from the evaluation of a protoptye fuel cell transit bus operating at Connecticut Transit in Hartford. Included are descriptions of the planned fuel cell bus demonstration and equipment, early results and agency experience are also provided.

  4. EV Everywhere Battery Workshop: Preliminary Target-Setting Framework |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy 4_ward_b.pdf More Documents & Publications EV Everywhere Electric Drive Workshop: Preliminary Target-Setting Framework EV Everywhere Consumer/Charging Workshop: Target-Setting Framework and Consumer Behavior EV Everywhere Grand Challenge Kick-off Parameters and Analysis

  5. EV Everywhere Electric Drive Workshop: Preliminary Target-Setting Framework

    Broader source: Energy.gov (indexed) [DOE]

    | Department of Energy Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop on July 24, 2012 held at the Doubletree O'Hare, Chicago, IL. PDF icon 3_ward_ed.pdf More Documents & Publications EV Everywhere Battery Workshop: Preliminary Target-Setting Framework EV Everywhere Consumer/Charging Workshop: Target-Setting Framework and Consumer Behavior

  6. Advanced Burner Reactor Preliminary NEPA Data Study.

    SciTech Connect (OSTI)

    Briggs, L. L.; Cahalan, J. E.; Deitrich, L. W.; Fanning, T. H.; Grandy, C.; Kellogg, R.; Kim, T. K.; Yang, W. S.; Nuclear Engineering Division

    2007-10-15

    The Global Nuclear Energy Partnership (GNEP) is a new nuclear fuel cycle paradigm with the goals of expanding the use of nuclear power both domestically and internationally, addressing nuclear waste management concerns, and promoting nonproliferation. A key aspect of this program is fast reactor transmutation, in which transuranics recovered from light water reactor spent fuel are to be recycled to create fast reactor transmutation fuels. The benefits of these fuels are to be demonstrated in an Advanced Burner Reactor (ABR), which will provide a representative environment for recycle fuel testing, safety testing, and modern fast reactor design and safeguard features. Because the GNEP programs will require facilities which may have an impact upon the environment within the meaning of the National Environmental Policy Act of 1969 (NEPA), preparation of a Programmatic Environmental Impact Statement (PEIS) for GNEP is being undertaken by Tetra Tech, Inc. The PEIS will include a section on the ABR. In support of the PEIS, the Nuclear Engineering Division of Argonne National Laboratory has been asked to provide a description of the ABR alternative, including graphics, plus estimates of construction and operations data for an ABR plant. The compilation of this information is presented in the remainder of this report. Currently, DOE has started the process of engaging industry on the design of an Advanced Burner Reactor. Therefore, there is no specific, current, vendor-produced ABR design that could be used for this PEIS datacall package. In addition, candidate sites for the ABR vary widely as to available water, geography, etc. Therefore, ANL has based its estimates for construction and operations data largely on generalization of available information from existing plants and from the environmental report assembled for the Clinch River Breeder Reactor Plant (CRBRP) design [CRBRP, 1977]. The CRBRP environmental report was chosen as a resource because it thoroughly documents the extensive evaluation which was performed on the anticipated environmental impacts of that plant. This source can be referenced in the open literature and is publicly available. The CRBRP design was also of a commercial demonstration plant size - 975 MWth - which falls in the middle of the range of ABR plant sizes being considered (250 MWth to 2000 MWth). At the time the project was cancelled, the CRBRP had progressed to the point of having completed the licensing application to the Nuclear Regulatory Commission (NRC) and was in the process of receiving NRC approval. Therefore, it was felt that [CRBRP, 1977] provides some of the best available data and information as input to the GNEP PEIS work. CRBRP was not the source of all the information in this document. It is also expected that the CRBRP data will be bounding from the standpoint of commodity usage because fast reactor vendors will develop designs which will focus on commodity and footprint reduction to reduce the overall cost per kilowatt electric compared with the CRBR plant. Other sources used for this datacall information package are explained throughout this document and in Appendix A. In particular, see Table A.1 for a summary of the data sources used to generate the datacall information.

  7. Preliminary Analysis of Modules Deployed at PV-USA for 18-24...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Analysis of Modules Deployed at PV-USA for 18-24 Years Preliminary Analysis of Modules Deployed at PV-USA for 18-24 Years Presented at the PV Module Reliability ...

  8. Tropical Warm Pool International Cloud Experiment (TWP-ICE): Cloud and Rain Characteristics in the Australian Monsoon

    SciTech Connect (OSTI)

    PT May; C Jakob; JH Mather

    2004-05-30

    The impact of oceanic convection on its environment and the relationship between the characteristics of the convection and the resulting cirrus characteristics is still not understood. An intense airborne measurement campaign combined with an extensive network of ground-based observations is being planned for the region near Darwin, Northern Australia, during January-February, 2006, to address these questions. The Tropical Warm Pool – International Cloud Experiment (TWP-ICE) will be the first field program in the tropics that attempts to describe the evolution of tropical convection, including the large scale heat, moisture, and momentum budgets, while at the same time obtaining detailed observations of cloud properties and the impact of the clouds on the environment. The emphasis will be on cirrus for the cloud properties component of the experiment. Cirrus clouds are ubiquitous in the tropics and have a large impact on their environment but the properties of these clouds are poorly understood. A crucial product from this experiment will be a dataset suitable to provide the forcing and testing required by cloud-resolving models and parameterizations in global climate models. This dataset will provide the necessary link between cloud properties and the models that are attempting to simulate them. The experiment is a collaboration between the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Program, the Bureau of Meteorology (BoM), the National Aeronautics and Space Administration (NASA), the European Commission DG RTD-1.2, and several United States, Australian, Canadian, and European Universities. This experiment will be undertaken over a 4-week period in early 2006. January and February corresponds to the wet phase of the Australia monsoon. This season has been selected because, despite Darwin’s coastal location, the convection that occurs over and near Darwin at this time is largely of maritime origin with a large fetch over water. Based on previous experiments, the convection appears typical of maritime convection with widespread convection that has complex organization, but is not as deep or as intense as continental or coastal convection. Therefore, it is expected that the convection and cloud characteristics will be representative of conditions typical for wide areas of the tropics.

  9. Neutron scattering of CeNi at the SNS-ORNL: A preliminary report

    SciTech Connect (OSTI)

    Mirmelstein, A. [Russian Federal Nuclear Center VNIITF, Snezhinsk, Russia; Podlesnyak, Andrey A [ORNL; Kolesnikov, Alexander I [ORNL; Saporov, B. [Oak Ridge National Laboratory (ORNL); Sefat, A.S. [Oak Ridge National Laboratory (ORNL); Tobin, J. G. [Lawrence Livermore National Laboratory (LLNL)

    2014-01-01

    This is a preliminary report of a neutron scattering experiment used to investigate 4f electron behavior in Ce.

  10. DOE Seeks Comments on its Preliminary Plan to Reduce Regulatory Burden |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Comments on its Preliminary Plan to Reduce Regulatory Burden DOE Seeks Comments on its Preliminary Plan to Reduce Regulatory Burden July 13, 2011 - 2:02pm Addthis The Department of Energy issued a notice seeking comment on its Preliminary Plan to implement Executive Order 13563, "Improving Regulation and Regulatory Review". The plan describes how the Department intends to conduct retrospective review of its regulations. The Department developed its Preliminary

  11. Preliminary Notice of Violation, Babcock & Wilcox Technical Services Y-12, LLC

    Broader source: Energy.gov [DOE]

    Worker Safety and Health Enforcement Preliminary Notice of Violation issued to Babcock & Wilcox Technical Services Y-12, LLC

  12. Tropical Warm Pool International Cloud Experiment TWP-ICE Cloud and rain characteristics in the Australian Monsoon

    SciTech Connect (OSTI)

    May, P.T., Jakob, C., and Mather, J.H.

    2004-05-31

    The impact of oceanic convection on its environment and the relationship between the characteristics of the convection and the resulting cirrus characteristics is still not understood. An intense airborne measurement campaign combined with an extensive network of ground-based observations is being planned for the region near Darwin, Northern Australia, during January-February, 2006, to address these questions. The Tropical Warm Pool International Cloud Experiment (TWP-ICE) will be the first field program in the tropics that attempts to describe the evolution of tropical convection, including the large scale heat, moisture, and momentum budgets, while at the same time obtaining detailed observations of cloud properties and the impact of the clouds on the environment. The emphasis will be on cirrus for the cloud properties component of the experiment. Cirrus clouds are ubiquitous in the tropics and have a large impact on their environment but the properties of these clouds are poorly understood. A crucial product from this experiment will be a dataset suitable to provide the forcing and testing required by cloud-resolving models and parameterizations in global climate models. This dataset will provide the necessary link between cloud properties and the models that are attempting to simulate them.

  13. Y-12 Apprentice Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Apprentice Program Over the years Y-12 has produced numerous training programs. Many of them have been developed at Y-12 to meet special needs. The training programs have ranged...

  14. DOE Laboratory Accreditation Program

    Broader source: Energy.gov [DOE]

    Administered by the Office of Worker Safety and Health Policy, the DOE Laboratory Accreditation Program (DOELAP) is responsible for implementing performance standards for DOE contractor external dosimetry and radiobioassay programs through periodic performance testing and on-site program assessments.

  15. Volunteer Program FAQs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Volunteer Program FAQs FAQs About Volunteer Program Your questions about volunteering answered. . . General info about LANL volunteering 2016 FAQs (pdf) Vecinos Volunteer Program What is the LANL Vecinos Volunteer Program? The LANL Vecinos Volunteer Program connects great employee and retiree volunteers with local nonprofit organizations needing assistance. What does the word 'Vecinos' mean? Vecinos, the name of the LANL Volunteer Program, means "neighbors" in Spanish. Our employee and

  16. DOE's Tribal Energy Program

    Office of Environmental Management (EM)

    and Programs, the Tribal Energy Program provides financial and technical assistance to Tribes to develop their renewable energy resources and reduce their energy consumption. ...

  17. Weapons Program Associate Directors

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    integration we have achieved between the various components of the program," said Bret Knapp, Principal Associate Director for Weapons Programs. "They have both done an...

  18. Hydropower Program Technology Overview

    SciTech Connect (OSTI)

    Not Available

    2001-10-01

    New fact sheets for the DOE Office of Power Technologies (OPT) that provide technology overviews, description of DOE programs, and market potential for each OPT program area.

  19. Programming on Franklin

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Programming Programming on Franklin Compiling Codes on Franklin Cray provides a convenient set of wrapper commands which should be used in almost all cases for compiling and...

  20. Civilian Nuclear Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Civilian Nuclear Program Civilian Nuclear Program Los Alamos is committed to using its advanced nuclear expertise and unique facilities to meet the civilian nuclear national ...

  1. Beryllium Program - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site workers. Program Performance Assessments Beryllium Program inspection and corrective action documents Feedback & Suggestions A closely monitored area to submit questions,...

  2. Energy Smart Grocer Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    New Commercial Program Development Commercial Current Promotions Industrial Federal Agriculture EnergySmart Grocer Program Close-out BPA and CLEAResult have concluded negotiations...

  3. USABC Program Highlights

    Office of Energy Efficiency and Renewable Energy (EERE)

    2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C.

  4. TMAC User Program

    Broader source: Energy.gov [DOE]

    2009 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C.

  5. ARM - Program Fact Sheets

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MaterialsProgram Fact Sheets Publications Journal Articles Conference Documents Program Documents Technical Reports Publications Database Public Information Materials Image Library...

  6. NREL: Education Center - Programs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Education Center Printable Version Programs NREL's Education Center in Golden, Colorado, offers a variety of program topics and experiences for students and adult groups addressing...

  7. " Generation, by Program Sponsorship...

    U.S. Energy Information Administration (EIA) Indexed Site

    by Total Inputs of Energy for Heat, Power, and Electricity" " Generation, by Program Sponsorship, Industry Group, Selected" " Industries, and Type of Energy-Management Program, ...

  8. " Generation by Program Sponsorship...

    U.S. Energy Information Administration (EIA) Indexed Site

    A49. Total Inputs of Energy for Heat, Power, and Electricity" " Generation by Program Sponsorship, Industry Group, Selected" " Industries, and Type of Energy-Management Program, ...

  9. Applied Energy Programs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (DoD) programs at Los Alamos, and to industry through the Laboratory's Technology Transfer Division. The Applied Energy programs encompass the broad set of energy focus areas:...

  10. Programs & User Facilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science Programs Office of Science Programs & User Facilities ... Advanced Scientific Computing Research Applied Mathematics Co-Design Centers Exascale Co-design Center ...

  11. SES CANDIDATE DEVELOPMENT PROGRAM

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 (11-03) SENIOR EXECUTIVE SERVICE CANDIDATE DEVELOPMENT PROGRAM (SESCDP) Evaluation of Formal Training DATE:... CANDIDATE NAME: TITLE OF TRAINING PROGRAM: VENDOR...

  12. Office of Strategic Programs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Strategic Programs STEAB Meeting JoAnn Milliken Washington, DC Acting Director June 27, 2012 Strategic Programs * Advanced Manufacturing * Sustainability Performance * Strategic ...

  13. Assistance Program, State Energy Program, Energy Efficiency and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assistance Program, State Energy Program, Energy Efficiency and Conservation Block Grants Assistance Program, State Energy Program, Energy Efficiency and Conservation Block Grants ...

  14. Analysis of Precipitation (Rain and Snow) Levels and Straight-line Wind Speeds in Support of the 10-year Natural Phenomena Hazards Review for Los Alamos National Laboratory

    SciTech Connect (OSTI)

    Kelly, Elizabeth J.; Dewart, Jean Marie; Deola, Regina

    2015-12-10

    This report provides site-specific return level analyses for rain, snow, and straight-line wind extreme events. These analyses are in support of the 10-year review plan for the assessment of meteorological natural phenomena hazards at Los Alamos National Laboratory (LANL). These analyses follow guidance from Department of Energy, DOE Standard, Natural Phenomena Hazards Analysis and Design Criteria for DOE Facilities (DOE-STD-1020-2012), Nuclear Regulatory Commission Standard Review Plan (NUREG-0800, 2007) and ANSI/ ANS-2.3-2011, Estimating Tornado, Hurricane, and Extreme Straight-Line Wind Characteristics at Nuclear Facility Sites. LANL precipitation and snow level data have been collected since 1910, although not all years are complete. In this report the results from the more recent data (1990–2014) are compared to those of past analyses and a 2004 National Oceanographic and Atmospheric Administration report. Given the many differences in the data sets used in these different analyses, the lack of statistically significant differences in return level estimates increases confidence in the data and in the modeling and analysis approach.

  15. Preliminary Aging Assessment of Nuclear Air-Treatment and Cooling System Fans

    SciTech Connect (OSTI)

    Winegardner,, W. K.

    1995-07-01

    A preliminary aging assessment of the fans used in nuclear air treatment and cooling systems was performed by the Pacific Northwest Laboratory as part of the U.S. Nuclear Regulatory Commission's Nuclear Plant Aging Research Program. Details from guides and standards for the design, testing, and installation of fans; results of failure surveys; and information concerning stressors, related aging mechanisms, and inspection, surveillance, and monitoring methods (ISMM) were compiled. Failure surveys suggest that about half of the failures reported for fans are primarily associated with aging. Aging mechanisms associated with the various fan components and resulting from mechanical, thermal, and environmental stressors include wear, fatigue, corrosion, and erosion of metals and the deterioration of belts and lubricants. A bearing is the component most frequently linked to fan failure. The assessment also suggests that ISMM that will detect irregularities arising from improper lubrication, cooling, alignment, and balance of the various components should aid in counteracting many of the aging effects that could impair fan performance. An expanded program, to define and evaluate the adequacy of current ISMM and maintenance practices and to include a documented Phase I aging assessment, is recommended.

  16. Internship Programs Calendar | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Internship Programs Calendar

  17. Savannah River Ecology Laboratory - Outreach Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Coyote's webpage

  18. Savannah River Ecology Laboratory - Outreach Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Field Guide PDF

  19. California Energy Incentive Programs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Retain Control ......7 Dynamic Pricing Programs: Federal Agencies Respond ......8 Utilities' Online Energy ...

  20. Laser Programs Highlights 1998

    SciTech Connect (OSTI)

    Lowdermilk, H.; Cassady, C.

    1999-12-01

    This report covers the following topics: Commentary; Laser Programs; Inertial Confinement Fusion/National Ignition Facility (ICF/NIF); Atomic Vapor Laser Isotope Separation (AVLIS); Laser Science and Technology (LS&T); Information Science and Technology Program (IS&T); Strategic Materials Applications Program (SMAP); Medical Technology Program (MTP) and Awards.

  1. Better Buildings Neighborhood Program

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Better Buildings Neighborhood Program: Business Models Guide, October 27, 2011.

  2. Biomass Program Overview

    SciTech Connect (OSTI)

    2010-01-01

    This document provides an overview of the Biomass Program's mission, strategic goals, and research approach.

  3. Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-01-01

    The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  4. Blue Creek Winter Range : Wildlife Mitigation Project : Preliminary Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; United States. Bureau of Indian Affairs; Spokane Tribe of the Spokane Reservation, Washington

    1994-11-01

    This preliminary Environmental Assessment examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities are analyzed: Habitat protection; Habitat enhancement; Operation and maintenance; and Monitoring and evaluation. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir.

  5. Preliminary Comments on Compliance Plan and Request for Clarification or,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in the Alternative, Rehearing of the District of Columbia Public Service Commission | Department of Energy Comments on Compliance Plan and Request for Clarification or, in the Alternative, Rehearing of the District of Columbia Public Service Commission Preliminary Comments on Compliance Plan and Request for Clarification or, in the Alternative, Rehearing of the District of Columbia Public Service Commission Docket No. EO-05-01: Pursuant to Order No. 202-05-3, issued by the Department of

  6. Preliminary Notice of Violation, SLAC National Accelerator Laboratory -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WEA-2009-01 | Department of Energy SLAC National Accelerator Laboratory - WEA-2009-01 Preliminary Notice of Violation, SLAC National Accelerator Laboratory - WEA-2009-01 April 3, 2009 This letter refers to the Department of Energy's (DOE) Office of Health, Safety and Security's Office of Enforcement investigation into the facts and circumstances associated with the September 13, 2007 On April 3, 2009, the U.S. Department of Energy (DOE) Office of Health, Safety and Security's Office of

  7. Preliminary Wave Energy Converters Extreme Load Analysis: Preprint

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Preliminary Wave Energy Converters Extreme Load Analysis Preprint Y-H. Yu, J. Van Rij, and M. Lawson National Renewable Energy Laboratory R. Coe Sandia National Laboratories To be presented at the 34 th International Conference on Ocean, Offshore and Arctic Engineering (OMAE 2015) St. John's, Newfoundland, Canada May 31-June 5, 2015 Conference Paper NREL/CP-5000-63677 March 2015 NOTICE The submitted manuscript has been offered by an employee of the Alliance for Sustainable Energy, LLC

  8. IMPACTS: Industrial Technologies Program, Summary of Program...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    support of the Industrial Technologies Program's (ITP's) mission to improve the energy intensity of the U.S. industrial sector, the Save Energy Now Initiative (formerly the ...

  9. SEP Program Planning Template ("Program Planning Template") ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    File Program Planning Template More Documents & Publications Commute Mode Switching Impact Tool Energy Intensity Indicators Data Refrigerator-Freezers (multiple defrost waiver)...

  10. Technology Commercialization Program 1991

    SciTech Connect (OSTI)

    Not Available

    1991-11-01

    This reference compilation describes the Technology Commercialization Program of the Department of Energy, Defense Programs. The compilation consists of two sections. Section 1, Plans and Procedures, describes the plans and procedures of the Defense Programs Technology Commercialization Program. The second section, Legislation and Policy, identifies legislation and policy related to the Program. The procedures for implementing statutory and regulatory requirements are evolving with time. This document will be periodically updated to reflect changes and new material.

  11. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory-Directed Research and Development Program FY2016 Program Plan Thomas Jefferson National Accelerator Facility Newport News, Virginia Thomas Jefferson National Accelerator Facility Laboratory-Directed Research and Development Program FY2016 Program Plan Introduction The Thomas Jefferson National Accelerator Facility (Jefferson Lab) Laboratory- Directed Research and Development (LDRD) program was planned through a formal management process consistent with DOE Order 413.2B, including

  12. Centralized Procurement Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Centralized Procurement Program What's New Who to Contact Current Products BOAs MOC Integrated Team Program Elements Future Products Welcome to the Carlsbad Field Office’s (CBFO) Centralized Procurement Program (CPP) Web Page. The purpose of the Centralized Procurement Program is to provide a standardized, economical system of acquisition and distribution of containers and equipment used for shipping Transuranic (TRU) Waste to the Waste Isolation Pilot Plant (WIPP). The program is available

  13. Preliminary Audit Report: OAS-RA-10-11

    Office of Energy Efficiency and Renewable Energy (EERE)

    Management Controls over the Commonwealth of Virginia's Efforts to Implement the American Recovery and Reinvestment Act Weatherization Assistance Program

  14. SOP for General Program Evaluations

    Broader source: Energy.gov [DOE]

    SOP for General Program Evaluations: Quality Assurance for General Program Evaluation Studies, June 26, 2006.

  15. Program Launch Letter from Mayor

    Broader source: Energy.gov [DOE]

    Program Launch Letter from Mayor, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  16. program | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Fact Sheets Crosscutting Technology Research Program Crosscutting Technology Research Program Sensors & Controls Summary Crosscutting Technology Research Program Simulation-Based Engineering Summary Crosscutting Technology Research Program Water Management R&D Summary Crosscutting Technology Research Program Innovative Energy Concepts Summary Crosscutting Technology Research Program High Performance Materials Summary Crosscutting Technology Research Program High Performance

  17. Biomass Thermochemical Conversion Program. 1984 annual report

    SciTech Connect (OSTI)

    Schiefelbein, G.F.; Stevens, D.J.; Gerber, M.A.

    1985-01-01

    The objective of the program is to generate scientific data and conversion process information that will lead to establishment of cost-effective process for converting biomass resources into clean fuels. The goal of the program is to develop the data base for biomass thermal conversion by investigating the fundamental aspects of conversion technologies and by exploring those parameters that are critical to the conversion processes. The research activities can be divided into: (1) gasification technology; (2) liquid fuels technology; (3) direct combustion technology; and (4) program support activities. These activities are described in detail in this report. Outstanding accomplishments during fiscal year 1984 include: (1) successful operation of 3-MW combustor/gas turbine system; (2) successful extended term operation of an indirectly heated, dual bed gasifier for producing medium-Btu gas; (3) determination that oxygen requirements for medium-Btu gasification of biomass in a pressurized, fluidized bed gasifier are low; (4) established interdependence of temperature and residence times on biomass pyrolysis oil yields; and (5) determination of preliminary technical feasibility of thermally gasifying high moisture biomass feedstocks. A bibliography of 1984 publications is included. 26 figs., 1 tab.

  18. Summary of NR Program Prometheus Efforts

    SciTech Connect (OSTI)

    Ashcroft, John; Eshelman, Curtis

    2007-01-30

    The Naval Reactors Program led work on the development of a reactor plant system for the Prometheus space reactor program. The work centered on a 200 kWe electric reactor plant with a 15-20 year mission applicable to nuclear electric propulsion (NEP). After a review of all reactor and energy conversion alternatives, a direct gas Brayton reactor plant was selected for further development. The work performed subsequent to this selection included preliminary nuclear reactor and reactor plant design, development of instrumentation and control techniques, modeling reactor plant operational features, development and testing of core and plant material options, and development of an overall project plan. Prior to restructuring of the program, substantial progress had been made on defining reference plant operating conditions, defining reactor mechanical, thermal and nuclear performance, understanding the capabilities and uncertainties provided by material alternatives, and planning non-nuclear and nuclear system testing. The mission requirements for the envisioned NEP missions cannot be accommodated with existing reactor technologies. Therefore concurrent design, development and testing would be needed to deliver a functional reactor system. Fuel and material performance beyond the current state of the art is needed. There is very little national infrastructure available for fast reactor nuclear testing and associated materials development and testing. Surface mission requirements may be different enough to warrant different reactor design approaches and development of a generic multi-purpose reactor requires substantial sacrifice in performance capability for each mission.

  19. Summary of NR Program Prometheus Efforts

    SciTech Connect (OSTI)

    J Ashcroft; C Eshelman

    2006-02-08

    The Naval Reactors Program led work on the development of a reactor plant system for the Prometheus space reactor program. The work centered on a 200 kWe electric reactor plant with a 15-20 year mission applicable to nuclear electric propulsion (NEP). After a review of all reactor and energy conversion alternatives, a direct gas Brayton reactor plant was selected for further development. The work performed subsequent to this selection included preliminary nuclear reactor and reactor plant design, development of instrumentation and control techniques, modeling reactor plant operational features, development and testing of core and plant material options, and development of an overall project plan. Prior to restructuring of the program, substantial progress had been made on defining reference plant operating conditions, defining reactor mechanical, thermal and nuclear performance, understanding the capabilities and uncertainties provided by material alternatives, and planning non-nuclear and nuclear system testing. The mission requirements for the envisioned NEP missions cannot be accommodated with existing reactor technologies. Therefore concurrent design, development and testing would be needed to deliver a functional reactor system. Fuel and material performance beyond the current state of the art is needed. There is very little national infrastructure available for fast reactor nuclear testing and associated materials development and testing. Surface mission requirements may be different enough to warrant different reactor design approaches and development of a generic multi-purpose reactor requires substantial sacrifice in performance capability for each mission.

  20. Brine Sampling and Evaluation Program, 1991 report

    SciTech Connect (OSTI)

    Deal, D.E.; Abitz, R.J.; Myers, J.; Martin, M.L.; Milligan, D.J.; Sobocinski, R.W.; Lipponer, P.P.J.; Belski, D.S.

    1993-09-01

    The data presented in this report are the result of Brine Sampling and Evaluation Program (BSEP) activities at the Waste Isolation Pilot Plan (WIPP) during 1991. These BSEP activities document and investigate the origins, hydraulic characteristics, extent, and composition of brine occurrences in the Permian Salado Formation and seepage of that brine into the excavations at the WIPP. When excavations began at the WIPP in 1982, small brine seepages (weeps) were observed on the walls. Brine studies began as part of the Site Validation Program and were formalized as a program in its own right in 1985. During nine years of observations (1982--1991), evidence has mounted that the amount of brine seeping into the WIPP excavations is limited, local, and only a small fraction of that required to produce hydrogen gas by corroding the metal in the waste drums and waste inventory. The data through 1990 is discussed in detail and summarized by Deal and others (1991). The data presented in this report describes progress made during the calendar year 1991 and focuses on four major areas: (1) quantification of the amount of brine seeping across vertical surfaces in the WIPP excavations (brine ``weeps); (2) monitoring of brine inflow, e.g., measuring brines recovered from holes drilled downward from the underground drifts (downholes), upward from the underground drifts (upholes), and from subhorizontal holes; (3) further characterization of brine geochemistry; and (4) preliminary quantification of the amount of brine that might be released by squeezing the underconsolidated clays present in the Salado Formation.

  1. Characteristics, finite element analysis, test description, and preliminary test results of the STM4-120 kinematic Stirling engine

    SciTech Connect (OSTI)

    Linker, K.L.; Rawlinson, K.S.; Smith, G.

    1991-10-01

    The Department of Energy`s Solar Thermal Program has as one of its program elements the development and evaluation of conversion device technologies applicable to dish-electric systems. The primary research and development combines a conversion device (heat engine), solar receiver, and generator mounted at the focus of a parabolic dish concentrator. The Stirling-cycle heat engine was identified as the conversion device for dish-electric with the most potential for meeting the program`s goals for efficiency, reliability, and installed cost. To advance the technology toward commercialization, Sandia National Laboratories has acquired a Stirling Thermal Motors, Inc., kinematic Stirling engine, STM4-120, for evaluation. The engine is being bench-tested at Sandia`s Engine Test Facility and will be combined later with a solar receiver for on-sun evaluation. This report presents the engine characteristics, finite element analyses of critical engine components, test system layout, instrumentation, and preliminary performance results from the bench test.

  2. Optical Rain Gauge and Tipping Bucket Rain Gauge Comparisons

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1. Introduction Measurement of rainfall and precipitation is a difficult task even in the best of circumstances. Different types of gauges are used depending on the type of...

  3. Emissions Scenarios, Costs, and Implementation Considerations of REDD Programs

    SciTech Connect (OSTI)

    Sathaye, Jayant; Andrasko, Ken; Chan, Peter

    2011-04-11

    Greenhouse gas emissions from the forestry sector are estimated to be 8.4 GtCO2-eq./year or about 17percent of the global emissions. We estimate that the cost forreducing deforestation is low in Africa and several times higher in Latin America and Southeast Asia. These cost estimates are sensitive to the uncertainties of how muchunsustainable high-revenue logging occurs, little understood transaction and program implementation costs, and barriers to implementation including governance issues. Due to lack of capacity in the affected countries, achieving reduction or avoidance of carbon emissions will require extensive REDD-plus programs. Preliminary REDD-plus Readiness cost estimates and program descriptions for Indonesia, Democratic Republic of the Congo, Ghana, Guyana and Mexico show that roughly one-third of potential REDD-plus mitigation benefits might come from avoided deforestation and the rest from avoided forest degradation and other REDD-plus activities.

  4. Community energy auditing: experience with the comprehensive community energy management program

    SciTech Connect (OSTI)

    Moore, J.L.; Berger, D.A.; Rubin, C.B.; Hutchinson, P.A. Sr.; Griggs, H.M.

    1980-09-01

    The report provides local officials and staff with information on lessons from the audit, projection, and general planning experiences of the Comprehensive Community Energy Management Program (CCEMP) communities and provides ANL and US DOE with information useful to the further development of local energy management planning methods. In keeping with the objectives, the report is organized into the following sections: Section II presents the evaluation issues and key findings based on the communities' experiences from Spring of 1979 to approximately March of 1980; Section III gives an organized review of experience of communities in applying the detailed audit methodology for estimating current community energy consumption and projecting future consumption and supply; Section IV provides a preliminary assessment of how audit information is being used in other CCEMP tasks; Section V presents an organized review of preliminary lessons from development of the community planning processes; and Section VI provides preliminary conclusions on the audit and planning methodology. (MCW)

  5. Optima Program Overview

    Broader source: Energy.gov [DOE]

    Plenary IV: Fuels of the Future: Accelerating the Co-Optimization of Fuels and Engines Optima Program Overview John Farrell, Laboratory Program Manager—Vehicle Technologies, National Renewable Energy Laboratory

  6. Sandia's Biofuels Program

    SciTech Connect (OSTI)

    Simmons, Blake; Singh, Seema; Lane, Todd; Reichardt, Tom; Davis, Ryan

    2014-07-22

    Sandia's biofuels program is focused on developing next-generation, renewable fuel solutions derived from biomass. In this video, various Sandia researchers discuss the program and the tools they employ to tackle the technical challenges they face.

  7. Teacher Development Programs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Teacher Development Programs LLNL Teacher Development LLNL's Science Education Program provides professional development instruction to in-service and pre-service middle school, high school, and community college science teachers

  8. Monte Carlo Example Programs

    Energy Science and Technology Software Center (OSTI)

    2006-05-09

    The Monte Carlo example programs VARHATOM and DMCATOM are two small, simple FORTRAN programs that illustrate the use of the Monte Carlo Mathematical technique for calculating the ground state energy of the hydrogen atom.

  9. Tribal Energy Program Review

    Broader source: Energy.gov [DOE]

    The 2015 Tribal Energy Program Review will include an overview of the Tribal Energy Program and a series of presentations by tribes exploring or deploying weatherization, energy efficiency, and...

  10. Safeguards and Security Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-07-21

    The order establishes responsibilities and program planning and management requirements for the Safeguards and Security Program. Admin Chg 1, dated 2-15-13, supersedes DOE O 470.4B.

  11. Express Energy Efficiency Program

    Broader source: Energy.gov [DOE]

    The Express Energy Efficiency Program provides free installation of energy-saving products. This program travels around Wisconsin, community-by-community, to see if they are installing in your...

  12. Design Assistance Program

    Broader source: Energy.gov [DOE]

    Efficiency measures that are not eligible under this program may be eligible for other Focus on Energy Business Programs. Eligible buildings include free-standing buildings, adaptive reuse, subst...

  13. New Construction Program

    Broader source: Energy.gov [DOE]

    NOTE: On March 2016, NYSERDA revised the Commercial New Construction program (PON 1601) extending the program through December 29, 2017, or until the funds are fully committed. 

  14. Farm Opportunities Loan Program

    Broader source: Energy.gov [DOE]

    The Farm Opportunity Loan Program (formerly known as the Sustainable Agriculture Loan Program) is designed to finance the purchase of equipment to add value to crops or livestock, adopt best...

  15. Environmental Disclosure Program

    Broader source: Energy.gov [DOE]

    The PSC created New York’s Environmental Disclosure Program via an order issued in December 1998. This program has been modified several times since it was established. A November 2008 PSC order...

  16. Protective Force Program Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-06-30

    Provides detailed requirements to supplement DOE O 473.2, Protective Force Program, which establishes the requirements and responsibilities for management and operation of the Department of Energy (DOE) Protective Force (PF) Program. Does not cancel other directives.

  17. About the Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About About the Program Bringing together top space science students with internationally ... The program is open to U.S. and foreign PhD students in space physics, planetary sciences, ...

  18. Standard Offer Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Note: H.B. 40, enacted in June 2015, changes the name of the Sustainably Priced Energy Enterprise Development (SPEED) Program to the Standard Offer Program and replaces the associated state...

  19. Hydrogen Program Overview

    Fuel Cell Technologies Publication and Product Library (EERE)

    This 2-page fact sheet provides a brief introduction to the DOE Hydrogen Program. It describes the program mission and answers the question: “Why Hydrogen?”

  20. Parallel programming with PCN

    SciTech Connect (OSTI)

    Foster, I.; Tuecke, S.

    1991-12-01

    PCN is a system for developing and executing parallel programs. It comprises a high-level programming language, tools for developing and debugging programs in this language, and interfaces to Fortran and C that allow the reuse of existing code in multilingual parallel programs. Programs developed using PCN are portable across many different workstations, networks, and parallel computers. This document provides all the information required to develop parallel programs with the PCN programming system. In includes both tutorial and reference material. It also presents the basic concepts that underly PCN, particularly where these are likely to be unfamiliar to the reader, and provides pointers to other documentation on the PCN language, programming techniques, and tools. PCN is in the public domain. The latest version of both the software and this manual can be obtained by anonymous FTP from Argonne National Laboratory in the directory pub/pcn at info.mcs.anl.gov (c.f. Appendix A).